{"meta":{"query_hash":"1c7c5e1068fe","filters":{"topic":"Construction Project Management and Performance"},"cohort_total":1206,"direct_labels_cover":2,"predictions_cover":1206,"exported":1206,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/1c7c5e1068fe","api":"https://metacan.xera.ac/api/v1/cohort?topic=Construction+Project+Management+and+Performance"},"results":[{"id":"W110534340","doi":"","title":"Executive Control with Flexibility In Managing Capital Projects","year":2001,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Project management triangle; Project management; Project planning; Process management; Extreme project management; Project charter; Work (physics); Program management; Business; Project stakeholder; Project risk management; Control (management); Engineering management; OPM3; Engineering; Computer science; Systems engineering","score_opus":0.07267817434519154,"score_gpt":0.3438077523799751,"score_spread":0.27112957803478355,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W110534340","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1690011,0.019345572,0.1688135,0.027892284,0.0009351188,0.00018499688,0.000041305204,0.00029761053,0.6134886],"genre_scores_gemma":[0.97464246,0.0016951376,0.009030747,0.0007186198,0.00030377146,0.00007985217,0.000012875434,0.000027616336,0.013488915],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9939984,0.0026317416,0.00021219636,0.0004451062,0.0015995022,0.0011130304],"domain_scores_gemma":[0.99476045,0.0025427046,0.0007277575,0.0005934088,0.0004613722,0.000914304],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008340001,0.0005609441,0.00022567053,0.0013585265,0.0019462234,0.01085985,0.0009792079,0.0017864404,0.004696161],"category_scores_gemma":[0.013813236,0.00031641667,0.000313632,0.001612315,0.0061055804,0.008749871,0.005000303,0.0019451058,0.0005226058],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000109257264,0.00005927482,0.0036028675,0.000115580624,0.000021888285,0.0005576299,0.006657924,0.011459169,0.00041641598,0.830425,0.004785405,0.14178956],"study_design_scores_gemma":[0.000108630054,0.00028342832,0.008332093,0.0007593171,0.000046704055,0.0007660596,0.008102952,0.015480513,0.0010266459,0.76342005,0.20156321,0.00011042705],"about_ca_topic_score_codex":0.002547039,"about_ca_topic_score_gemma":0.0023966806,"teacher_disagreement_score":0.01085985,"about_ca_system_score_codex":0.0025343832,"about_ca_system_score_gemma":0.003213952,"threshold_uncertainty_score":0.044106662},"labels":[],"label_agreement":null},{"id":"W114440510","doi":"","title":"CSIR contribution to the 2010 state of engineering infrastructure in South Africa report card","year":2010,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Documentation; Government (linguistics); Business; Sanitation; Report card; Critical infrastructure; Quarter (Canadian coin); Private sector; Engineering; Finance; Economic growth; Computer security; Computer science; Geography; Sociology; Economics","score_opus":0.02225312415833081,"score_gpt":0.2870921040716105,"score_spread":0.2648389799132797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W114440510","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05256048,0.011483197,0.004556884,0.07478944,0.025234994,0.0040727565,0.23000751,0.0026894219,0.5946053],"genre_scores_gemma":[0.17078145,0.03139802,0.023105446,0.004874434,0.004320631,0.0035509015,0.22432825,0.0018358293,0.535805],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9932509,0.00059783173,0.00094105164,0.00034990776,0.0037934077,0.001066749],"domain_scores_gemma":[0.9717907,0.0020628148,0.0027455753,0.0015153596,0.01918122,0.0027044287],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0065690055,0.0012696263,0.00061941816,0.011316988,0.0019479033,0.008096395,0.0018880346,0.0018663692,0.03608619],"category_scores_gemma":[0.028902663,0.0010985348,0.00043605914,0.010725418,0.00067419565,0.0033086403,0.003950828,0.0024355494,0.01767055],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012510354,0.000103353384,0.004887057,0.0015477547,0.000016684859,0.0004975373,0.0014040445,0.00068583444,0.0013965141,0.010819051,0.8994987,0.079018325],"study_design_scores_gemma":[0.000007912425,0.000020385183,0.010153097,0.00035302964,0.00000822657,0.00011377036,0.00083771005,0.00018810657,0.0007831831,0.00031536704,0.9871947,0.00002455897],"about_ca_topic_score_codex":0.09831495,"about_ca_topic_score_gemma":0.045526583,"teacher_disagreement_score":0.09831495,"about_ca_system_score_codex":0.009322005,"about_ca_system_score_gemma":0.033720102,"threshold_uncertainty_score":0.19548535},"labels":[],"label_agreement":null},{"id":"W12988100","doi":"","title":"Strategy for the development of investment decision-making framework for road asset management for queensland department of main roads","year":2003,"lang":"en","type":"article","venue":"Canadian hospital","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Asset management; Investment (military); Business; Asset (computer security); Process (computing); Reliability (semiconductor); Risk analysis (engineering); Environmental resource management; Environmental economics; Environmental planning; Finance; Economics; Computer science; Computer security","score_opus":0.05173782913824244,"score_gpt":0.34806683240553116,"score_spread":0.2963290032672887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W12988100","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02460692,0.0021995087,0.84349334,0.02152853,0.00027629582,0.0052960836,0.0026316172,0.00086234475,0.09910529],"genre_scores_gemma":[0.15366656,0.0010180775,0.8112435,0.00049844047,0.000057245994,0.002133108,0.0015806331,0.00014546477,0.029657003],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99434584,0.0024194226,0.0003434966,0.00027128463,0.0020717946,0.00054817984],"domain_scores_gemma":[0.99588555,0.0011912091,0.00027427194,0.00020164611,0.0019584652,0.0004888409],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0126792565,0.00080284715,0.0005832715,0.002273478,0.0017875095,0.0038449485,0.0017705314,0.0015472553,0.011480302],"category_scores_gemma":[0.009271526,0.000592628,0.0009925847,0.0019148963,0.001224967,0.0016345575,0.0018167305,0.0018021943,0.0012704561],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055119515,0.00019896073,0.0054246783,0.00065127556,0.000085127926,0.00045764828,0.003280446,0.13539298,0.0022617253,0.5105824,0.0605691,0.28104046],"study_design_scores_gemma":[0.00015055346,0.00038696037,0.012701193,0.0017236029,0.00011517702,0.00029742287,0.0040254076,0.30449513,0.0021035483,0.17008929,0.5037378,0.0001739234],"about_ca_topic_score_codex":0.25658995,"about_ca_topic_score_gemma":0.26266384,"teacher_disagreement_score":0.25658995,"about_ca_system_score_codex":0.023167819,"about_ca_system_score_gemma":0.06412393,"threshold_uncertainty_score":0.5101929},"labels":[],"label_agreement":null},{"id":"W140072734","doi":"","title":"Multi-Tiered Selection of Project Delivery Systems for Capital Projects","year":2014,"lang":"en","type":"dissertation","venue":"Spectrum Research Repository (Concordia University)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Ranking (information retrieval); Integrated project delivery; General partnership; Process (computing); Set (abstract data type); Selection (genetic algorithm); Engineering; Decision support system; Public–private partnership; Key (lock); Project management; Multiple-criteria decision analysis; Computer science; Operations research; Process management; Management science; Systems engineering; Business; Data mining; Artificial intelligence; Finance","score_opus":0.09720162828763486,"score_gpt":0.3574630909780273,"score_spread":0.26026146269039246,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W140072734","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21523708,0.00052370725,0.76324534,0.0008567891,0.00008234315,0.002559896,0.0010979839,0.0021511675,0.014245631],"genre_scores_gemma":[0.48204696,0.00030929944,0.5133964,0.000068304376,0.000017893428,0.00060718943,0.0009240573,0.000076851924,0.00255308],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9922489,0.0032664272,0.0009762111,0.00087474874,0.0021500858,0.00048364868],"domain_scores_gemma":[0.98874,0.0053818026,0.001635277,0.00064340956,0.0031162992,0.00048321084],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010535492,0.00103878,0.0011295209,0.005057032,0.0015434582,0.0055421665,0.0014121676,0.0007325009,0.0048809317],"category_scores_gemma":[0.018752228,0.00061452494,0.0010342416,0.0031511425,0.0005241977,0.0029783582,0.0020891838,0.0010298707,0.0010404538],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00093889947,0.00067197706,0.03980012,0.0011981115,0.00014485126,0.0004629281,0.002186533,0.16309233,0.012034594,0.02858454,0.006850595,0.74403447],"study_design_scores_gemma":[0.00026728914,0.0014689313,0.01794826,0.00056522276,0.00022174585,0.00048663229,0.0038676944,0.88405865,0.028745882,0.027932942,0.034157947,0.0002788668],"about_ca_topic_score_codex":0.0027133978,"about_ca_topic_score_gemma":0.004511801,"teacher_disagreement_score":0.010535492,"about_ca_system_score_codex":0.0026063172,"about_ca_system_score_gemma":0.0046234448,"threshold_uncertainty_score":0.055717707},"labels":[],"label_agreement":null},{"id":"W148823439","doi":"","title":"Key performance indicators to measure design performance in construction","year":2009,"lang":"en","type":"dissertation","venue":"Spectrum Research Repository (Concordia University)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Performance indicator; Measure (data warehouse); Benchmark (surveying); Context (archaeology); Process (computing); Engineering design process; Engineering; Key (lock); Quality (philosophy); Process management; Systems engineering; Computer science; Business","score_opus":0.07364333024241337,"score_gpt":0.3281090440972358,"score_spread":0.2544657138548224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W148823439","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30725035,0.009946578,0.31169373,0.0034060876,0.0006285043,0.005103198,0.016032798,0.0021309252,0.34380788],"genre_scores_gemma":[0.8289788,0.004326296,0.14303377,0.00025272573,0.00007968454,0.0018020896,0.005528021,0.00020982452,0.015788777],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.96999544,0.005251019,0.0022118345,0.00095071195,0.019791942,0.0017991618],"domain_scores_gemma":[0.9477742,0.01289845,0.010596755,0.0024163995,0.024573157,0.0017411787],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013955364,0.0020611922,0.0010075509,0.011414654,0.0020838967,0.005253155,0.0018109625,0.0012895757,0.0065614637],"category_scores_gemma":[0.04211513,0.00045337866,0.0011296291,0.020750627,0.0025881736,0.0035742077,0.0029382885,0.0017592594,0.0018280726],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006729928,0.00077135453,0.23061949,0.008248995,0.00039008792,0.0004060193,0.012012862,0.036959164,0.014277466,0.07888013,0.02821473,0.5885467],"study_design_scores_gemma":[0.000070256,0.0018838042,0.6593808,0.0033666054,0.0003835758,0.000585496,0.020067254,0.030032536,0.016686225,0.028367937,0.2386116,0.00056391774],"about_ca_topic_score_codex":0.09479917,"about_ca_topic_score_gemma":0.13764177,"teacher_disagreement_score":0.09479917,"about_ca_system_score_codex":0.015166035,"about_ca_system_score_gemma":0.01723524,"threshold_uncertainty_score":0.18849474},"labels":[],"label_agreement":null},{"id":"W1496330034","doi":"10.1177/875697280403500306","title":"Understanding the Role of “Vision” in Project Success","year":2004,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":135,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Government of British Columbia","funders":"","keywords":"Project management; Project management triangle; Project sponsorship; Project stakeholder; Extreme project management; Project charter; Project manager; Project portfolio management; Process management; Project planning; Knowledge management; Engineering; Engineering management; Business; OPM3; Computer science; Systems engineering","score_opus":0.14542769744871675,"score_gpt":0.3853666500645633,"score_spread":0.23993895261584652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1496330034","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6041215,0.003072901,0.10959888,0.029739046,0.00033280175,0.00025616813,0.000044569166,0.00023511388,0.252599],"genre_scores_gemma":[0.99399346,0.00027902497,0.004910559,0.00016441401,0.00001677773,0.000045359273,0.000008800571,0.000013863817,0.0005677301],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9817716,0.011677914,0.0007320236,0.00084570283,0.0030528442,0.0019198053],"domain_scores_gemma":[0.9451125,0.029654447,0.009524165,0.0017615152,0.0068934774,0.007053947],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022843186,0.00044742695,0.00035365668,0.0035892515,0.0036453807,0.010767798,0.0009133205,0.0021009352,0.0021097139],"category_scores_gemma":[0.050396442,0.00054571545,0.00033551356,0.0016497289,0.012735622,0.011574401,0.0054222276,0.0028053364,0.00033642107],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024911086,0.0005404565,0.07754261,0.0008132797,0.00009865796,0.00079689367,0.06704642,0.0044565066,0.002838212,0.6197875,0.0057540424,0.22007625],"study_design_scores_gemma":[0.00010453704,0.0012401083,0.13965365,0.0012410571,0.00010666983,0.0012852078,0.13902898,0.022455702,0.0032693478,0.63639253,0.054923303,0.00029889145],"about_ca_topic_score_codex":0.0032988973,"about_ca_topic_score_gemma":0.0033122732,"teacher_disagreement_score":0.022843186,"about_ca_system_score_codex":0.0045769047,"about_ca_system_score_gemma":0.0082938215,"threshold_uncertainty_score":0.12080777},"labels":[],"label_agreement":null},{"id":"W1499451153","doi":"","title":"Les entreprises se préoccupent-elles vraiment de la faisabilité de leurs projets? Révélations de 64 acteurs clés provenant de 14 entreprises variées","year":2011,"lang":"fr","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Physics; Art","score_opus":0.14352180830199388,"score_gpt":0.41035746220134106,"score_spread":0.26683565389934716,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1499451153","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9610199,0.0010842526,0.0051804967,0.007543637,0.00011185616,0.0002324458,0.00027696733,0.000059835354,0.024490723],"genre_scores_gemma":[0.9834374,0.0006650098,0.0039818482,0.0010167845,0.000017087,0.00023021741,0.00014592466,0.000042578467,0.01046323],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9805314,0.009501673,0.000854357,0.0017445743,0.0054645687,0.0019034968],"domain_scores_gemma":[0.92619836,0.037675094,0.010206492,0.0041506374,0.016852852,0.0049164924],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021374878,0.00046537892,0.0006257867,0.002260272,0.007436791,0.00777028,0.0014038013,0.0014702232,0.0054018814],"category_scores_gemma":[0.05619779,0.0005701165,0.000496486,0.0032846262,0.006611164,0.0042605605,0.0034002704,0.0028366162,0.00074527186],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003339092,0.00027518644,0.25568897,0.001078574,0.00018396947,0.0010608198,0.6102659,0.0004801083,0.0034820577,0.023595564,0.0073146075,0.09624032],"study_design_scores_gemma":[0.000033132565,0.0002300031,0.2777043,0.0010260594,0.00012296418,0.00027294614,0.6316208,0.0012225297,0.0022912237,0.0050344733,0.08031214,0.00012937849],"about_ca_topic_score_codex":0.18817721,"about_ca_topic_score_gemma":0.284705,"teacher_disagreement_score":0.18817721,"about_ca_system_score_codex":0.018908096,"about_ca_system_score_gemma":0.029063893,"threshold_uncertainty_score":0.3741638},"labels":[],"label_agreement":null},{"id":"W1500073464","doi":"10.1177/875697280403500406","title":"A Balanced Scorecard Approach to Project Management Leadership","year":2004,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":96,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Balanced scorecard; Process management; Project management triangle; Project management; Dimension (graph theory); Performance measurement; Project charter; Strategy map; Project manager; Computer science; Knowledge management; Engineering management; Business; Engineering; Systems engineering; Marketing","score_opus":0.24166354804504733,"score_gpt":0.37984942610949046,"score_spread":0.13818587806444313,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1500073464","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011291236,0.0013542434,0.93618846,0.0037742837,0.00059266965,0.001242902,0.00024355794,0.00038305315,0.04492965],"genre_scores_gemma":[0.17123014,0.0012929959,0.8188189,0.0005686597,0.0004458836,0.001942698,0.00029661297,0.0001094867,0.005294661],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9275169,0.04843664,0.005025974,0.0026918948,0.015296701,0.0010319229],"domain_scores_gemma":[0.9736934,0.011766765,0.003278067,0.0022609076,0.007873839,0.0011271001],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.037982646,0.0016886387,0.0014174904,0.012196292,0.00209886,0.009331015,0.002145445,0.00115575,0.0046791835],"category_scores_gemma":[0.065325305,0.0005324244,0.0005190948,0.01599041,0.005613227,0.0065421658,0.0033115805,0.0024728146,0.0011757436],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011425502,0.00015842133,0.0031500002,0.0006271861,0.00010059573,0.000099756646,0.0023934313,0.0057515777,0.0012328968,0.45573285,0.009204442,0.52143466],"study_design_scores_gemma":[0.00023805656,0.0010025979,0.0073143807,0.0010520435,0.00009392607,0.0005098023,0.004275913,0.05045015,0.0029347648,0.71620715,0.21566512,0.00025609165],"about_ca_topic_score_codex":0.0021986074,"about_ca_topic_score_gemma":0.002946597,"teacher_disagreement_score":0.037982646,"about_ca_system_score_codex":0.0068539456,"about_ca_system_score_gemma":0.006543433,"threshold_uncertainty_score":0.20087379},"labels":[],"label_agreement":null},{"id":"W1501084497","doi":"","title":"The body of knowledge of the Project Management Institute-PMBOK® Guide, and the specificities of project management: a critical review","year":2010,"lang":"en","type":"review","venue":"Innovar","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":156,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"","keywords":"Project management; Ambiguity; Knowledge management; Context (archaeology); Perspective (graphical); Relation (database); Process (computing); Process management; Management science; Engineering; Engineering ethics; Sociology; Computer science; Systems engineering; Geography","score_opus":0.15990631132959157,"score_gpt":0.4517224402417852,"score_spread":0.29181612891219366,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1501084497","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0001526469,0.97789484,0.0021995436,0.014398199,0.0012999647,0.00005150244,0.000045889246,0.000019150491,0.0039382107],"genre_scores_gemma":[0.0030371815,0.9870433,0.004768249,0.002507543,0.00072615204,0.00021546546,0.000091899936,0.000016332882,0.0015937636],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9897488,0.0035073692,0.0014436612,0.0006775835,0.004418808,0.00020373617],"domain_scores_gemma":[0.97030896,0.020153733,0.0018975605,0.00062313623,0.0065918006,0.00042481517],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016467031,0.0010558446,0.0014815567,0.011246979,0.0014743038,0.004715801,0.002458821,0.004121449,0.0024967159],"category_scores_gemma":[0.027622541,0.0009131804,0.00055480184,0.014023722,0.005166221,0.008407573,0.0027246354,0.004596651,0.0019916252],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032404554,0.00005230415,0.00034539876,0.01980157,0.000037097336,0.0002093126,0.0019904238,0.0005691316,0.0003920209,0.05690354,0.14155944,0.7781074],"study_design_scores_gemma":[0.000005126803,0.00002617063,0.00073202635,0.016626153,0.000016757926,0.00033812725,0.0007621578,0.00010788372,0.00017908086,0.00929264,0.97188985,0.000024042196],"about_ca_topic_score_codex":0.007626272,"about_ca_topic_score_gemma":0.009644108,"teacher_disagreement_score":0.016467031,"about_ca_system_score_codex":0.0078117847,"about_ca_system_score_gemma":0.025925525,"threshold_uncertainty_score":0.087087035},"labels":[],"label_agreement":null},{"id":"W1501352882","doi":"","title":"Can Measurement Error Explain the Weakness of Productivity Growth in the Canadian Construction Industry","year":2007,"lang":"en","type":"article","venue":"RePEc: Research Papers in Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Economics; Econometrics; Multifactor productivity; Observational error; Labour economics; Total factor productivity; Macroeconomics","score_opus":0.1427716222326515,"score_gpt":0.3714841511169477,"score_spread":0.22871252888429622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1501352882","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81423473,0.020124858,0.055099424,0.049116492,0.0024369427,0.0004436815,0.0068292,0.00047491185,0.051239762],"genre_scores_gemma":[0.9919722,0.0014499122,0.0027152041,0.0013116278,0.00018054449,0.000066912726,0.00086569745,0.000058797454,0.0013790358],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.94389266,0.013791968,0.005103532,0.0068858373,0.024549302,0.0057767816],"domain_scores_gemma":[0.81343347,0.07697251,0.047034428,0.017988643,0.043009114,0.0015618723],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.06351866,0.0008674167,0.0017341726,0.0038820198,0.0024802939,0.003717443,0.0027497984,0.0010564603,0.0011893683],"category_scores_gemma":[0.27184993,0.00066904887,0.0012188369,0.009634257,0.0043465835,0.0027516834,0.002811713,0.0019537786,0.00048642873],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022827515,0.00005594929,0.88529336,0.0006763608,0.0015592681,0.00025337323,0.0077922973,0.0038408453,0.0004530464,0.01863339,0.007880421,0.073333375],"study_design_scores_gemma":[0.000036487738,0.00006444607,0.9677769,0.00065563817,0.000335858,0.00011103087,0.0028273708,0.005570241,0.0010596343,0.0070206574,0.014433637,0.0001081624],"about_ca_topic_score_codex":0.80789506,"about_ca_topic_score_gemma":0.7571145,"teacher_disagreement_score":0.9851068,"about_ca_system_score_codex":0.0148931695,"about_ca_system_score_gemma":0.01875523,"threshold_uncertainty_score":0.38647252},"labels":[],"label_agreement":null},{"id":"W1504363409","doi":"10.1108/01409171311292234","title":"Project management assets and project management performance outcomes","year":2013,"lang":"en","type":"article","venue":"Management Research Review","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":42,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; Athabasca University","funders":"","keywords":"Competitive advantage; Project management triangle; Business; Originality; OPM3; Project management; Resource-based view; Project portfolio management; Sample (material); Knowledge management; Marketing; Process management; Computer science; Economics; Management; Qualitative research","score_opus":0.36226250524684767,"score_gpt":0.5072054527236008,"score_spread":0.14494294747675318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1504363409","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9892039,0.00038896527,0.0015277432,0.00032054112,0.000009152036,0.000092995695,0.00023834953,0.000013042547,0.008205242],"genre_scores_gemma":[0.99842286,0.0001734177,0.0006719145,0.00001621692,0.0000075403605,0.0000661804,0.00016709307,0.0000026749844,0.0004721982],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.994194,0.002963268,0.00055904634,0.0002188517,0.0017029685,0.0003619279],"domain_scores_gemma":[0.95085067,0.016529324,0.022475936,0.0012144572,0.005906043,0.0030235795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00545635,0.00028701604,0.00031100225,0.0017074423,0.00046375883,0.0014120452,0.00034600828,0.00022542365,0.0044873473],"category_scores_gemma":[0.028372347,0.00009419258,0.00023590222,0.0020031475,0.0005669465,0.00094637077,0.0013559543,0.0006028739,0.00047927117],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014795078,0.0006550164,0.8855255,0.00036025356,0.000101610254,0.00013194315,0.0013978528,0.000980904,0.00035298167,0.0010315276,0.0008537075,0.10846069],"study_design_scores_gemma":[0.000009329777,0.0005585774,0.9907418,0.00017663007,0.000030782143,0.00016295901,0.0035708628,0.00081248046,0.00052665954,0.00076664996,0.0026264335,0.000016909646],"about_ca_topic_score_codex":0.00096199714,"about_ca_topic_score_gemma":0.0012018197,"teacher_disagreement_score":0.00545635,"about_ca_system_score_codex":0.0006267826,"about_ca_system_score_gemma":0.0010642846,"threshold_uncertainty_score":0.028856218},"labels":[],"label_agreement":null},{"id":"W1515695077","doi":"10.1007/978-3-319-48156-2_79","title":"Satisfying Financial Institutions for Major Capital Projects","year":2016,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hatch (Canada)","funders":"","keywords":"Capital (architecture); Business; Finance; Permission; Accounting; Political science; Geography","score_opus":0.1856062515659108,"score_gpt":0.3682765480936355,"score_spread":0.18267029652772473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1515695077","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0066631897,0.017240295,0.01665255,0.044028953,0.0027160933,0.000083547304,0.00015919142,0.000185615,0.91227055],"genre_scores_gemma":[0.15013069,0.018426415,0.020616125,0.0054790624,0.0016299025,0.00021708956,0.00028800304,0.00028044666,0.8029322],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990201,0.0003399589,0.00004869192,0.0000747057,0.00035649238,0.00016008032],"domain_scores_gemma":[0.9992661,0.0002194084,0.0001035189,0.00006563128,0.00020262797,0.00014272057],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016870406,0.00054826157,0.00024623802,0.00066172774,0.0023554717,0.0059293406,0.00064592314,0.0021990184,0.01867834],"category_scores_gemma":[0.0042689415,0.00023154795,0.00020000317,0.0014183539,0.0020527265,0.004027211,0.0020660541,0.0029273622,0.0046721245],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011403167,0.000026160178,0.0003005759,0.000067543144,0.0000023607292,0.000038062397,0.00088771636,0.0006672801,0.000117711534,0.6436009,0.23332173,0.12095859],"study_design_scores_gemma":[0.0000038692565,0.00001007458,0.00053442054,0.00022152119,0.0000020954828,0.000060056922,0.00075316336,0.00051661726,0.0001580071,0.26115146,0.7365786,0.000010246484],"about_ca_topic_score_codex":0.0027625496,"about_ca_topic_score_gemma":0.009520287,"teacher_disagreement_score":0.01867834,"about_ca_system_score_codex":0.003299081,"about_ca_system_score_gemma":0.0065848073,"threshold_uncertainty_score":0.062485278},"labels":[],"label_agreement":null},{"id":"W1516931571","doi":"10.11575/prism/30197","title":"Rethinking project management – Old truths and new insights.","year":2001,"lang":"en","type":"article","venue":"PRISM (University of Calgary)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":67,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Athabasca University","keywords":"Computer science; Epistemology; Philosophy","score_opus":0.06634645997265959,"score_gpt":0.27499651826435056,"score_spread":0.20865005829169098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1516931571","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012579452,0.16890924,0.028701898,0.66936946,0.01363525,0.00014275125,0.0001757266,0.00023575668,0.10625052],"genre_scores_gemma":[0.53070855,0.20960867,0.05473267,0.06750688,0.010480336,0.00076076173,0.0004299735,0.00087819755,0.12489388],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.973292,0.018778635,0.0010264693,0.0010643322,0.004921908,0.00091665983],"domain_scores_gemma":[0.96102107,0.025388911,0.0020802263,0.0028912828,0.0058700386,0.0027483944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.027128614,0.0007841289,0.00035132302,0.0028134878,0.0052298633,0.015197989,0.0018435024,0.004817793,0.0047872933],"category_scores_gemma":[0.03471098,0.000525173,0.00039325698,0.0035695184,0.024514176,0.030356051,0.007045828,0.005808934,0.0015574367],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003817935,0.00005332565,0.0020061624,0.00091601175,0.000017921455,0.0003187977,0.06807497,0.00046246496,0.00026316242,0.39172634,0.22724512,0.3088776],"study_design_scores_gemma":[0.000008535774,0.000040554245,0.002719826,0.0021087094,0.0000074506165,0.00025111937,0.044489037,0.00031426555,0.0002114272,0.20102747,0.748792,0.000029601437],"about_ca_topic_score_codex":0.011804313,"about_ca_topic_score_gemma":0.02162262,"teacher_disagreement_score":0.027128614,"about_ca_system_score_codex":0.009588644,"about_ca_system_score_gemma":0.017608026,"threshold_uncertainty_score":0.1434716},"labels":[],"label_agreement":null},{"id":"W1516996126","doi":"","title":"La gouvernance des grands projets d'infrastructure publique - Le processus de révision de la qualité","year":2006,"lang":"fr","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.03577681116673148,"score_gpt":0.3714001361637444,"score_spread":0.3356233249970129,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1516996126","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44029492,0.013184745,0.061247945,0.11783134,0.0025982268,0.0026947057,0.005477698,0.0038404847,0.3528299],"genre_scores_gemma":[0.76941323,0.006869663,0.0338239,0.0056203525,0.0002885515,0.00072978996,0.0024504364,0.000558733,0.18024525],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.988993,0.0019108139,0.0003422692,0.0010502889,0.0063414024,0.0013621671],"domain_scores_gemma":[0.9404262,0.006963651,0.0027145837,0.0037532884,0.0390717,0.0070705744],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017291665,0.0007835463,0.00051309157,0.0033515685,0.0071299844,0.011945082,0.0026127917,0.0018408465,0.0138234],"category_scores_gemma":[0.028983956,0.0006489179,0.0007436395,0.004073984,0.0048754085,0.004782811,0.004063332,0.0033420397,0.0017062553],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028550433,0.00053180254,0.08872961,0.002572123,0.00022076629,0.0011722356,0.04188386,0.0053695426,0.014638475,0.12674743,0.110549495,0.60729915],"study_design_scores_gemma":[0.000047126625,0.00051858794,0.19463086,0.0009800667,0.00011298731,0.00039612476,0.027141398,0.0028640418,0.0062837484,0.0058285818,0.76098114,0.0002152894],"about_ca_topic_score_codex":0.82619596,"about_ca_topic_score_gemma":0.844832,"teacher_disagreement_score":0.82619596,"about_ca_system_score_codex":0.044967774,"about_ca_system_score_gemma":0.13603772,"threshold_uncertainty_score":0.3496552},"labels":[],"label_agreement":null},{"id":"W1519271070","doi":"","title":"The Quest To Find The Metis Of Projects","year":2013,"lang":"en","type":"dissertation","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Art; Theology; Philosophy","score_opus":0.08364734041418745,"score_gpt":0.39686330758457056,"score_spread":0.31321596717038314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1519271070","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020122334,0.031191979,0.21363203,0.33142203,0.00429414,0.00038848465,0.0007951686,0.0011472141,0.39700657],"genre_scores_gemma":[0.38517392,0.03630203,0.30285233,0.017423943,0.003409379,0.0017176917,0.0017047453,0.0021319087,0.24928409],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9754895,0.01137731,0.0014371634,0.0044681607,0.0059610144,0.0012668145],"domain_scores_gemma":[0.9582765,0.0154552385,0.0037514635,0.009212191,0.008292151,0.005012443],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.025267098,0.0012609696,0.0014472544,0.0065971897,0.0083818715,0.036801726,0.004730874,0.008044157,0.03323335],"category_scores_gemma":[0.078773566,0.0015499294,0.0012902558,0.00696158,0.025912896,0.068569206,0.01912087,0.009341612,0.014022014],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020855185,0.00003709477,0.00084246864,0.00021154244,0.000014254821,0.0000665097,0.0041634846,0.00055564416,0.000156228,0.91049343,0.020063665,0.06337475],"study_design_scores_gemma":[0.000013931898,0.00003508309,0.00033244365,0.0004915165,0.000008429719,0.00013933526,0.005648155,0.0009895297,0.00019154964,0.59657985,0.39553714,0.000033149798],"about_ca_topic_score_codex":0.0064811883,"about_ca_topic_score_gemma":0.00482555,"teacher_disagreement_score":0.036801726,"about_ca_system_score_codex":0.010113049,"about_ca_system_score_gemma":0.021402908,"threshold_uncertainty_score":0.13362676},"labels":[],"label_agreement":null},{"id":"W1522451427","doi":"10.21236/ada457737","title":"Program Managers' Competencies: A Consideration of Project Management Competencies on the Specific Case of the Land Reserve Modernization Project at Meaford, Ontario, Canada","year":2006,"lang":"en","type":"report","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Modernization theory; Business; Engineering management; Environmental resource management; Knowledge management; Process management; Engineering; Computer science; Environmental science; Economics; Economic growth","score_opus":0.14980261214092366,"score_gpt":0.3421055842087907,"score_spread":0.19230297206786706,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1522451427","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8924279,0.00049096404,0.00068961835,0.007694628,0.000012404739,0.00016355256,0.00009146641,0.000008781206,0.098420724],"genre_scores_gemma":[0.9893427,0.0006557787,0.0006764431,0.00027086498,0.0000048709126,0.000032405755,0.000046498855,0.0000030582285,0.008967378],"study_design_codex":"qualitative","study_design_gemma":"not_applicable","domain_scores_codex":[0.99837625,0.00036213605,0.000036064077,0.000048104997,0.00051261374,0.0006647774],"domain_scores_gemma":[0.99762744,0.0007159418,0.0002075054,0.000032695916,0.0006438909,0.00077252684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013866937,0.0001900424,0.00009684813,0.00132541,0.0061057108,0.0023602839,0.00077185314,0.00045240813,0.002238625],"category_scores_gemma":[0.0032059147,0.00016204565,0.00011405493,0.0013377666,0.002214975,0.0009101541,0.0011840125,0.0007653426,0.000103719416],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012911911,0.0006201067,0.29890123,0.0004939096,0.000027716098,0.012852547,0.39601615,0.0044850283,0.0032403062,0.080692194,0.03382618,0.1687155],"study_design_scores_gemma":[0.000013688802,0.00010236226,0.3561429,0.0003173705,0.000014071826,0.0010222681,0.5576716,0.0023247541,0.000778122,0.0013431875,0.080241516,0.000028232755],"about_ca_topic_score_codex":0.88367134,"about_ca_topic_score_gemma":0.9740631,"teacher_disagreement_score":0.11632866,"about_ca_system_score_codex":0.03151354,"about_ca_system_score_gemma":0.057248008,"threshold_uncertainty_score":0.23402745},"labels":[],"label_agreement":null},{"id":"W1525345695","doi":"10.1109/hicss.2015.530","title":"Project-Based Organizing: The Unexpected Trajectory of the Project to the Crisis","year":2015,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Crisis management; Project management; Trajectory; Reuse; Swift; Political science; Process management; Computer science; Business; Public relations; Engineering; Economics; Management","score_opus":0.2027263343091449,"score_gpt":0.38307137973349964,"score_spread":0.18034504542435473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1525345695","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8428112,0.00032632166,0.040129144,0.0059722094,0.00015118287,0.00033855348,0.00016833449,0.00016288752,0.109940074],"genre_scores_gemma":[0.994115,0.000119321536,0.0028096645,0.00009265904,0.000012044578,0.00007706711,0.00004088431,0.000023053222,0.0027101894],"study_design_codex":"qualitative","study_design_gemma":"not_applicable","domain_scores_codex":[0.997442,0.0016006045,0.000059182308,0.00015823756,0.00036913413,0.00037083376],"domain_scores_gemma":[0.9971487,0.0010989334,0.0003431222,0.00023963753,0.00035790607,0.0008116031],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026182476,0.00033264834,0.00021796009,0.00096830254,0.005391567,0.004761392,0.0007940729,0.0013321863,0.004759973],"category_scores_gemma":[0.007069677,0.00019960082,0.00025079458,0.001117584,0.004079864,0.0037994985,0.00619846,0.0018939917,0.00050588406],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040904022,0.00039517818,0.043206744,0.0005132418,0.000054023032,0.014455321,0.52848154,0.006723375,0.006816801,0.28362158,0.016597293,0.098725766],"study_design_scores_gemma":[0.000036223697,0.00051449635,0.033076752,0.00042254207,0.00003391064,0.0039078714,0.71618366,0.008934814,0.0022148278,0.080728516,0.15384424,0.00010212995],"about_ca_topic_score_codex":0.0022506649,"about_ca_topic_score_gemma":0.0030077512,"teacher_disagreement_score":0.005391567,"about_ca_system_score_codex":0.001712825,"about_ca_system_score_gemma":0.0026605737,"threshold_uncertainty_score":0.015923679},"labels":[],"label_agreement":null},{"id":"W1529943115","doi":"10.1002/9781118915912.ch8","title":"Planning and Organizing","year":2014,"lang":"en","type":"other","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Plan (archaeology); Reading (process); Baseline (sea); Work (physics); Computer science; Engineering; Political science; Geography; Law; Archaeology","score_opus":0.09684156236007324,"score_gpt":0.37974223994149475,"score_spread":0.2829006775814215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1529943115","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008401323,0.001651493,0.026691163,0.007629606,0.0006468237,0.00018415118,0.00017462058,0.0001390631,0.96204287],"genre_scores_gemma":[0.15354241,0.010677442,0.054440413,0.004032131,0.0009099651,0.0008418523,0.0014189832,0.0007423469,0.7733944],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9967236,0.0014619796,0.00015730747,0.00039071095,0.000892085,0.00037428012],"domain_scores_gemma":[0.9981558,0.0005954112,0.000093371214,0.00041962284,0.0004426829,0.0002931203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044546006,0.0005958371,0.0005174865,0.0013529803,0.0051063597,0.013637978,0.0015281586,0.0015960725,0.05385334],"category_scores_gemma":[0.007264328,0.00046793764,0.00040935492,0.0034381284,0.008506617,0.009075397,0.0038006757,0.002565263,0.012330378],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000030920014,0.000011205853,0.00014086522,0.00004340711,0.0000019530748,0.000020632213,0.0019875518,0.0005140588,0.000045102002,0.9150337,0.040122103,0.042076375],"study_design_scores_gemma":[0.000001889895,0.000005510411,0.00023297172,0.00014807498,0.0000019656745,0.000022368025,0.0028668395,0.00017483508,0.0000629363,0.23620515,0.7602726,0.0000047760223],"about_ca_topic_score_codex":0.012325797,"about_ca_topic_score_gemma":0.012446441,"teacher_disagreement_score":0.05385334,"about_ca_system_score_codex":0.0046659308,"about_ca_system_score_gemma":0.014466739,"threshold_uncertainty_score":0.18015736},"labels":[],"label_agreement":null},{"id":"W1532985277","doi":"10.1108/17538371211214888","title":"Projects and organisations","year":2012,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Originality; Project management; Function (biology); Theme (computing); Sociology; OPM3; Corporate governance; Project stakeholder; Project charter; Set (abstract data type); Program management; Knowledge management; Management; Computer science; Social science; Qualitative research","score_opus":0.10003488527946756,"score_gpt":0.3750921985607727,"score_spread":0.2750573132813051,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1532985277","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018708523,0.09648109,0.019939179,0.20273773,0.028196631,0.00053313386,0.0005311278,0.00030407312,0.6325685],"genre_scores_gemma":[0.60235274,0.108147554,0.030072723,0.047971055,0.015793541,0.0020768791,0.0009964035,0.0005532303,0.19203587],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9766043,0.014807005,0.0014165613,0.001619753,0.0042825392,0.0012698331],"domain_scores_gemma":[0.97398585,0.011975106,0.0022983486,0.0032589326,0.004034339,0.0044474504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010613569,0.0005230239,0.0005789834,0.002621289,0.005179079,0.018534243,0.0010935288,0.0025990447,0.01765379],"category_scores_gemma":[0.030401155,0.0003105889,0.00038923672,0.004692186,0.015490974,0.012618138,0.012202045,0.0040610824,0.003691548],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020312089,0.000024532152,0.0011745349,0.00059688056,0.00001010765,0.000108180975,0.014983048,0.00012465587,0.000102341386,0.79182625,0.09295847,0.09807069],"study_design_scores_gemma":[0.0000043900964,0.000020206677,0.00076402095,0.00075644645,0.0000031302486,0.00018536032,0.007558494,0.00003285189,0.000028293725,0.0559848,0.9346549,0.0000071635777],"about_ca_topic_score_codex":0.0018961366,"about_ca_topic_score_gemma":0.0017873403,"teacher_disagreement_score":0.018534243,"about_ca_system_score_codex":0.0045577143,"about_ca_system_score_gemma":0.008960577,"threshold_uncertainty_score":0.05905783},"labels":[],"label_agreement":null},{"id":"W1533335638","doi":"10.1111/j.1468-232x.2009.00586.x","title":"Project Labor Agreements’ Effect on School Construction Costs in Massachusetts","year":2009,"lang":"en","type":"article","venue":"Industrial Relations A Journal of Economy and Society","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Bedford Institute of Oceanography","funders":"","keywords":"Simple (philosophy); Economics; Labour economics; Labor cost; Engineering","score_opus":0.06875613811234405,"score_gpt":0.34275923054500723,"score_spread":0.2740030924326632,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1533335638","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9979704,0.00007455507,0.00014941684,0.00024620016,0.0000018251114,0.000003658945,0.00008896062,0.0000062986433,0.0014586473],"genre_scores_gemma":[0.99939716,0.000031042597,0.00004185887,0.0000084191815,0.000002448295,0.000004086584,0.00005003501,0.0000013101229,0.00046359035],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9973143,0.0014351404,0.00009341642,0.00020459847,0.00047347485,0.00047908936],"domain_scores_gemma":[0.9865856,0.006155096,0.0047758226,0.00058351964,0.0010786048,0.0008214112],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013653004,0.00017538968,0.00038869202,0.00084348104,0.00050162186,0.0010679624,0.00069100066,0.00045847567,0.0052874647],"category_scores_gemma":[0.011374635,0.00024402846,0.00038673714,0.0013637512,0.0007179347,0.00067524536,0.0014009859,0.00072875776,0.0002428262],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008063983,0.00045940044,0.911325,0.00009570122,0.00030286663,0.00094492827,0.002212322,0.045821242,0.002301208,0.009936824,0.0020505348,0.023743618],"study_design_scores_gemma":[0.00004347641,0.00026781554,0.98600173,0.00001548466,0.00007203106,0.000051819276,0.0018455469,0.008532058,0.00041881832,0.0008229913,0.0019117137,0.000016570193],"about_ca_topic_score_codex":0.10828835,"about_ca_topic_score_gemma":0.17665452,"teacher_disagreement_score":0.10828835,"about_ca_system_score_codex":0.0048480476,"about_ca_system_score_gemma":0.0014735416,"threshold_uncertainty_score":0.21531606},"labels":[],"label_agreement":null},{"id":"W1533491512","doi":"10.1002/9781118959312.ch13","title":"Re‐Estimation: A Recovery Effort Model","year":2015,"lang":"en","type":"other","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Estimation; Computer science; Key (lock); Operations research; Section (typography); Engineering; Systems engineering; Computer security","score_opus":0.1356996247025682,"score_gpt":0.3840317221304718,"score_spread":0.24833209742790363,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1533491512","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0138545865,0.00029344173,0.9703011,0.001787333,0.000076451746,0.00013399783,0.00021337187,0.0002243699,0.013115345],"genre_scores_gemma":[0.76409113,0.0015237463,0.18665802,0.00039012684,0.0001607008,0.0006725043,0.00055732415,0.00023066485,0.045715813],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99698764,0.0010568491,0.00019104434,0.0005780073,0.00081849814,0.00036803802],"domain_scores_gemma":[0.99383,0.003187713,0.0010021849,0.0004134488,0.0013886759,0.00017807711],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052824966,0.0012486023,0.0010499752,0.001286717,0.00053401594,0.0032946623,0.004123992,0.002521604,0.0071991705],"category_scores_gemma":[0.014607926,0.00070632476,0.0010200907,0.0013895638,0.0012486725,0.005166721,0.0023711822,0.0031402826,0.0014670484],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006704183,0.000070215036,0.0014834565,0.00011631004,0.00002472294,0.00017799549,0.00026233905,0.83085245,0.00075216143,0.12871525,0.0029142667,0.03456384],"study_design_scores_gemma":[0.00000682848,0.00003573019,0.00037323698,0.0000446071,0.000016206639,0.00005995442,0.000086367625,0.97238183,0.00036797635,0.023182869,0.0034239555,0.000020432399],"about_ca_topic_score_codex":0.010229558,"about_ca_topic_score_gemma":0.0052200537,"teacher_disagreement_score":0.010229558,"about_ca_system_score_codex":0.0025371136,"about_ca_system_score_gemma":0.002951594,"threshold_uncertainty_score":0.027936816},"labels":[],"label_agreement":null},{"id":"W1535087466","doi":"","title":"LES BUREAUX DE PROJET AU QUÉBEC : UNE ÉTUDE DESCRIPTIVE","year":2007,"lang":"fr","type":"article","venue":"ASAC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Rimouski","funders":"","keywords":"Political science; Humanities; Art","score_opus":0.10840776162451157,"score_gpt":0.38551094902178484,"score_spread":0.27710318739727324,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1535087466","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.854097,0.007973391,0.00508644,0.0030227087,0.00016956174,0.0007681529,0.030298423,0.00021255418,0.098371744],"genre_scores_gemma":[0.90501964,0.008139154,0.005119413,0.00081757444,0.000033378023,0.0008472826,0.010915464,0.00010638361,0.06900179],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99790144,0.00027258202,0.00014563435,0.00026392136,0.0010482892,0.0003681402],"domain_scores_gemma":[0.99077046,0.0015283863,0.0010685145,0.0002493368,0.0056156768,0.0007675614],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020098991,0.00039389858,0.00033091658,0.003942387,0.003840927,0.0035288788,0.000985167,0.00052957184,0.012683572],"category_scores_gemma":[0.00682872,0.00032807936,0.0003360246,0.0132113425,0.0013189343,0.0012367778,0.0011864529,0.0010654025,0.0009453709],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002013311,0.00026244257,0.67951757,0.0021088384,0.00014739437,0.001095276,0.075597845,0.0014662354,0.0019822204,0.012987378,0.035944786,0.18868877],"study_design_scores_gemma":[0.00000863253,0.0000871927,0.7932358,0.000979045,0.000061790095,0.0001847384,0.057507277,0.0006930469,0.0005745451,0.00031555624,0.14629634,0.000055949124],"about_ca_topic_score_codex":0.97124815,"about_ca_topic_score_gemma":0.9830441,"teacher_disagreement_score":0.035934888,"about_ca_system_score_codex":0.035934888,"about_ca_system_score_gemma":0.044880252,"threshold_uncertainty_score":0.2607271},"labels":[],"label_agreement":null},{"id":"W1536267918","doi":"","title":"KAIROGRAMA: MUDANÇAS NOS PLANOS DE OBRAS A PARTIR DE UMA PERSPECTIVA DE COMUNICAÇÃO","year":2013,"lang":"pt","type":"article","venue":"Revista Técnico-Científica","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Sociology; Humanities; Philosophy; Epistemology","score_opus":0.0499371187508214,"score_gpt":0.331197117467713,"score_spread":0.2812599987168916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1536267918","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1573562,0.0024937585,0.33446306,0.009763795,0.000523601,0.0005695896,0.0012439189,0.0044971914,0.48908895],"genre_scores_gemma":[0.82846916,0.0018920788,0.07749341,0.00058466673,0.00009928903,0.00034741708,0.0005457487,0.0014373914,0.08913092],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99746335,0.00079492887,0.00013852763,0.0005173145,0.0007223608,0.00036356444],"domain_scores_gemma":[0.99671423,0.0012357655,0.0003245513,0.000833063,0.00062012306,0.0002722406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018732758,0.00092100486,0.000543013,0.002494953,0.005191966,0.014877886,0.0015437198,0.0022065695,0.026568174],"category_scores_gemma":[0.008288451,0.00079784595,0.0008124282,0.0040068626,0.0059354655,0.01480578,0.0063335085,0.0019645698,0.0067784134],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003760757,0.00012521716,0.013248797,0.00085265934,0.000066679255,0.0018485435,0.1262009,0.0055601145,0.013801968,0.6004068,0.018572055,0.21894017],"study_design_scores_gemma":[0.00004836203,0.00018603617,0.013012461,0.00063760945,0.00014792051,0.0012283642,0.09663937,0.014971068,0.007761594,0.18493637,0.68023103,0.0001997164],"about_ca_topic_score_codex":0.01778478,"about_ca_topic_score_gemma":0.015298401,"teacher_disagreement_score":0.026568174,"about_ca_system_score_codex":0.0034272939,"about_ca_system_score_gemma":0.0046145567,"threshold_uncertainty_score":0.08887941},"labels":[],"label_agreement":null},{"id":"W1539542755","doi":"10.5772/51460","title":"Risk Management in Construction Projects","year":2012,"lang":"en","type":"book-chapter","venue":"InTech eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":174,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Gross value added; Productivity; Business; Economic shortage; Quarter (Canadian coin); Gross domestic product; Private sector; Unemployment; Economic policy; Economy; Economics; Economic growth; Geography","score_opus":0.07902699071406999,"score_gpt":0.3256985397149054,"score_spread":0.24667154900083543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1539542755","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021900117,0.226705,0.18810935,0.013874778,0.002038588,0.00029800992,0.00018708679,0.00046444222,0.54642254],"genre_scores_gemma":[0.345963,0.24229506,0.092113726,0.0021968891,0.0023353791,0.0005202362,0.00035239168,0.00033287195,0.31389043],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99751747,0.0006990598,0.000107273234,0.00014305,0.0014179304,0.00011525894],"domain_scores_gemma":[0.9989152,0.00060658454,0.00012688019,0.00008007958,0.00020588716,0.000065291024],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018667936,0.0008835387,0.0004896795,0.0011861597,0.0010419671,0.0042480184,0.0009993779,0.0016791759,0.0047852807],"category_scores_gemma":[0.0037143114,0.0003791322,0.00051536615,0.0020578152,0.0018604252,0.0024415303,0.0021900223,0.0021861088,0.0019479304],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046727397,0.00010503402,0.0008537675,0.00097544654,0.00004904757,0.00051379186,0.0033073518,0.022204919,0.0014053142,0.36060804,0.0672941,0.5426365],"study_design_scores_gemma":[0.000015027588,0.00010297836,0.0019501079,0.0019915823,0.000029364675,0.0011258814,0.0015180851,0.007976934,0.0008771653,0.42683572,0.5575138,0.000063393294],"about_ca_topic_score_codex":0.0012889735,"about_ca_topic_score_gemma":0.000986424,"teacher_disagreement_score":0.0047852807,"about_ca_system_score_codex":0.0014624713,"about_ca_system_score_gemma":0.0018762819,"threshold_uncertainty_score":0.016008317},"labels":[],"label_agreement":null},{"id":"W1540207033","doi":"10.1007/978-3-642-00980-8_2","title":"Nanotechnology in Construction: A Roadmap for Development","year":2009,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":45,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Scope (computer science); Nanotechnology; Engineering; Cover (algebra); Systems engineering; Computer science; Mechanical engineering; Materials science","score_opus":0.11176689426421385,"score_gpt":0.34771324069008014,"score_spread":0.2359463464258663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1540207033","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014848077,0.31836975,0.033456985,0.028300922,0.005347357,0.000069984664,0.00012204308,0.00021302258,0.61263514],"genre_scores_gemma":[0.033716656,0.35195506,0.05082341,0.0069491635,0.0024898336,0.00020232389,0.00022550196,0.0002904107,0.55334765],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9996624,0.000084350606,0.000015265045,0.000037031798,0.00017165414,0.000029353627],"domain_scores_gemma":[0.9997081,0.00016026224,0.000010956731,0.000021038857,0.00007822776,0.000021469265],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006195578,0.00078306923,0.0005835023,0.0012218492,0.0009864668,0.0041077323,0.0008398931,0.002400527,0.014503723],"category_scores_gemma":[0.00071178906,0.00031520153,0.0004308412,0.001728774,0.0022646894,0.005232367,0.0016055002,0.002216631,0.0035767439],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000074979375,0.00004079477,0.000079856516,0.00044128665,0.0000063779135,0.000045127104,0.000289944,0.0011333129,0.00046443476,0.6765189,0.13049093,0.1904815],"study_design_scores_gemma":[0.0000017164567,0.000009053467,0.00009599569,0.00031080988,0.0000027290923,0.00006744363,0.00015759192,0.0004524263,0.0001786972,0.15279055,0.8459264,0.00000660786],"about_ca_topic_score_codex":0.0030062746,"about_ca_topic_score_gemma":0.009800998,"teacher_disagreement_score":0.014503723,"about_ca_system_score_codex":0.0032035506,"about_ca_system_score_gemma":0.0046106772,"threshold_uncertainty_score":0.04851979},"labels":[],"label_agreement":null},{"id":"W1542153271","doi":"","title":"Guide pratique pour l'identification et la gestion des enjeux sociopolitiques","year":2007,"lang":"fr","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Political science; Humanities; Art","score_opus":0.14803017394089094,"score_gpt":0.4617206732829193,"score_spread":0.3136904993420284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1542153271","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0059704143,0.0070224996,0.56723535,0.071293406,0.0023546352,0.0034084802,0.0025235354,0.005319218,0.33487242],"genre_scores_gemma":[0.03763292,0.008058935,0.59863013,0.00989346,0.0004595762,0.004574814,0.0019589341,0.0019419433,0.33684924],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.962283,0.021349434,0.001995929,0.0026194768,0.010787422,0.00096476707],"domain_scores_gemma":[0.9392504,0.030481169,0.0019978844,0.007653869,0.018663587,0.0019530501],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.029341161,0.0020700395,0.0013678259,0.0050964397,0.007299401,0.018385492,0.0041068685,0.009173418,0.055160902],"category_scores_gemma":[0.05893887,0.0019650587,0.0016996308,0.0035284478,0.008814462,0.013612536,0.009920103,0.011382488,0.03515367],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008759469,0.00022039183,0.0017377202,0.0013394277,0.000045007437,0.0007004311,0.04705009,0.0017458677,0.003089476,0.43477184,0.19395807,0.31525403],"study_design_scores_gemma":[0.000011653063,0.00004243879,0.00045342426,0.00090922124,0.000009199309,0.00024014318,0.005604967,0.00054237945,0.00071892334,0.039392482,0.952027,0.000048209942],"about_ca_topic_score_codex":0.026418928,"about_ca_topic_score_gemma":0.032554816,"teacher_disagreement_score":0.055160902,"about_ca_system_score_codex":0.009472506,"about_ca_system_score_gemma":0.025232513,"threshold_uncertainty_score":0.18453163},"labels":[],"label_agreement":null},{"id":"W1554495320","doi":"10.1177/117718011200800302","title":"Isomorphism and Organizational Culture","year":2012,"lang":"en","type":"article","venue":"AlterNative An International Journal of Indigenous Peoples","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Athabasca University","funders":"","keywords":"Isomorphism (crystallography); Context (archaeology); Stakeholder; Organizational culture; Government (linguistics); Institutional theory; Public relations; Sociology; Work (physics); Perception; Knowledge management; Political science; Business; Social science; Engineering; Epistemology; Computer science; Geography","score_opus":0.05260580709291375,"score_gpt":0.36607123189977125,"score_spread":0.3134654248068575,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1554495320","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93717885,0.00029434016,0.0022695824,0.0012038635,0.000027648262,0.000062023224,0.000010008762,0.000010652077,0.058943123],"genre_scores_gemma":[0.9985511,0.00008578577,0.00025367332,0.000040127186,0.0000023670377,0.0000116806505,0.000005289209,0.0000024338751,0.0010475882],"study_design_codex":"qualitative","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9909401,0.0047098673,0.00021861962,0.00055103615,0.0017575026,0.0018228757],"domain_scores_gemma":[0.9953023,0.0015210436,0.0008676035,0.00048343895,0.00065609114,0.0011694874],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005416178,0.00027964677,0.00026176072,0.0021642405,0.013075399,0.0098657645,0.0014644838,0.0006633413,0.0031495313],"category_scores_gemma":[0.00786915,0.000236842,0.00020446499,0.0022142406,0.03302596,0.002746995,0.009863975,0.0012709044,0.00011986116],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000066845656,0.00025499574,0.08058089,0.000094587085,0.00003667167,0.0010472139,0.5413173,0.0008924292,0.0009583732,0.3326687,0.0008055574,0.041276425],"study_design_scores_gemma":[0.000015644606,0.00013701782,0.051519778,0.00013048374,0.000024235509,0.00031966245,0.8966384,0.0006362339,0.00035298272,0.019535758,0.030655367,0.000034602785],"about_ca_topic_score_codex":0.21786718,"about_ca_topic_score_gemma":0.2992293,"teacher_disagreement_score":0.21786718,"about_ca_system_score_codex":0.023403047,"about_ca_system_score_gemma":0.02540528,"threshold_uncertainty_score":0.43319815},"labels":[],"label_agreement":null},{"id":"W1558355851","doi":"","title":"Analyse des pratiques de gestion des ressources humaines en contexte de projet au sein des entreprises publiques et privées du Québec","year":2012,"lang":"fr","type":"article","venue":"Sémaphore (Université du Québec à Rimouski)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Philosophy","score_opus":0.040301880523852154,"score_gpt":0.28549219027732003,"score_spread":0.2451903097534679,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1558355851","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.972242,0.00034934626,0.0012097552,0.0016249962,0.000020232392,0.000079810925,0.0005228119,0.00003880818,0.023912152],"genre_scores_gemma":[0.97663283,0.00029417736,0.00094673474,0.00012944982,0.0000068254267,0.00006721836,0.00025005397,0.000012172943,0.021660404],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9985483,0.00044474567,0.00004703269,0.00015289773,0.0004888129,0.0003182083],"domain_scores_gemma":[0.9912778,0.0019440034,0.0010879904,0.00019725719,0.0041313106,0.0013615933],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024259884,0.00022179226,0.0002127575,0.001344658,0.0033949967,0.0030279371,0.0006779834,0.0005237572,0.008953774],"category_scores_gemma":[0.006586963,0.00016580132,0.00018844764,0.0023895283,0.0012917651,0.0011806851,0.0013965826,0.0007211445,0.0007044657],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002057347,0.000249105,0.63977,0.0004855455,0.000106554864,0.0014301264,0.21368589,0.002535837,0.0046971124,0.0072197914,0.009006822,0.12060746],"study_design_scores_gemma":[0.0000045343354,0.00009691397,0.7925082,0.00019833863,0.000022620621,0.000072670686,0.17256162,0.0014674185,0.00056648074,0.0003810229,0.032076605,0.000043515734],"about_ca_topic_score_codex":0.84365386,"about_ca_topic_score_gemma":0.9100835,"teacher_disagreement_score":0.84365386,"about_ca_system_score_codex":0.022964902,"about_ca_system_score_gemma":0.027048614,"threshold_uncertainty_score":0.31453377},"labels":[],"label_agreement":null},{"id":"W1564969396","doi":"10.19255/40","title":"Concurrent engineering in Brazilian construction companies: Maturity assessment","year":2014,"lang":"en","type":"article","venue":"Journal of Modern Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Maturity (psychological); Concurrent engineering; Multidisciplinary approach; Quality (philosophy); Work (physics); Capability Maturity Model; Business; Process management; Operations management; Engineering; Marketing; Computer science; Political science","score_opus":0.047111234685414775,"score_gpt":0.3576503524927933,"score_spread":0.31053911780737853,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1564969396","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9883763,0.00060449715,0.0026232644,0.00039121168,0.0000050361746,0.00009962848,0.000035606692,0.000007748695,0.00785664],"genre_scores_gemma":[0.9981065,0.0002532776,0.0012591773,0.000014653377,0.0000017309545,0.000022813469,0.000025840942,0.0000014560231,0.00031447524],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9972121,0.00087108155,0.0002455108,0.00021605942,0.0011272774,0.0003279541],"domain_scores_gemma":[0.9827315,0.0071532736,0.0034473452,0.00044256134,0.0054032495,0.0008220089],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00531056,0.00021703394,0.00015323637,0.003158968,0.0012406707,0.001983455,0.00034239003,0.00043064164,0.0008190637],"category_scores_gemma":[0.016707381,0.00021129323,0.00020947646,0.0025165381,0.0010669103,0.0012246934,0.0014939373,0.00042698276,0.000075796765],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001274889,0.00023902504,0.6016892,0.0006903566,0.00003673775,0.0010403797,0.18015599,0.0019657924,0.011028741,0.014583293,0.0006653054,0.18777762],"study_design_scores_gemma":[0.000017714838,0.00047185944,0.71430653,0.0008825846,0.000055426564,0.0011964926,0.23773792,0.00591914,0.004576868,0.0048454483,0.029894948,0.00009508307],"about_ca_topic_score_codex":0.017617721,"about_ca_topic_score_gemma":0.030376108,"teacher_disagreement_score":0.017617721,"about_ca_system_score_codex":0.003941541,"about_ca_system_score_gemma":0.0050351075,"threshold_uncertainty_score":0.035030365},"labels":[],"label_agreement":null},{"id":"W1565132962","doi":"10.11575/prism/30191","title":"Project lessons learned: Implications for an empirical study in the Canadian energy sector","year":2006,"lang":"en","type":"article","venue":"AUSpace (Athabasca University)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Athabasca University","keywords":"Energy sector; Upstream (networking); Project management; Best practice; Engineering; Field (mathematics); Business; Engineering management; Process management; Management; Economics; Systems engineering; Environmental economics","score_opus":0.23027395329327563,"score_gpt":0.40624915718596577,"score_spread":0.17597520389269014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1565132962","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9636798,0.00082235795,0.0018533465,0.0112312995,0.000047253256,0.0018651164,0.000655114,0.000027202446,0.01981852],"genre_scores_gemma":[0.99452597,0.0008344412,0.0017807982,0.0007631164,0.000011117545,0.00054943335,0.0002291255,0.0000083113455,0.0012976337],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.97886777,0.008306626,0.0012064443,0.0010755593,0.006525927,0.004017667],"domain_scores_gemma":[0.8868987,0.06312439,0.0066370955,0.0025271943,0.035635024,0.005177574],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.036460195,0.00073685293,0.00078113936,0.003067605,0.009138365,0.008345418,0.0038526177,0.0018900449,0.0041654394],"category_scores_gemma":[0.12824316,0.00056507555,0.00043181426,0.008771787,0.007698841,0.0062181205,0.0037809308,0.0031536298,0.00030158434],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051077513,0.004981009,0.40224501,0.0031886632,0.00011149989,0.0018180154,0.3680628,0.0044660587,0.0005688406,0.02700938,0.013822725,0.17321523],"study_design_scores_gemma":[0.000095084186,0.0003434731,0.13454716,0.002046184,0.00007505176,0.00013909944,0.84023947,0.0038574599,0.0008870816,0.004769061,0.012896424,0.000104499675],"about_ca_topic_score_codex":0.8254114,"about_ca_topic_score_gemma":0.86856663,"teacher_disagreement_score":0.17458862,"about_ca_system_score_codex":0.085704945,"about_ca_system_score_gemma":0.1100738,"threshold_uncertainty_score":0.6218358},"labels":[],"label_agreement":null},{"id":"W1566752785","doi":"10.5539/ass.v11n18p123","title":"The Influence of Transformational Leadership Style on ICT Adoption in the Nigerian Construction Industry","year":2015,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Transformational leadership; Structural equation modeling; Leadership style; Business; Competitive advantage; Knowledge management; Path analysis (statistics); Process (computing); Transactional leadership; Information and Communications Technology; Public relations; Marketing; Political science; Computer science","score_opus":0.1544666101910344,"score_gpt":0.36793251718588615,"score_spread":0.21346590699485177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1566752785","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9993981,0.00003736971,0.000014696229,0.000041612024,0.0000012745719,0.000002014533,0.000003850728,2.818681e-7,0.0005006857],"genre_scores_gemma":[0.9997744,0.000054095624,0.000018251225,0.0000061625524,0.0000010859166,0.0000014155323,0.0000047714116,3.282508e-7,0.00013951359],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993724,0.00023186537,0.000042293126,0.000046650526,0.00011697357,0.00018982068],"domain_scores_gemma":[0.9965647,0.0013320134,0.00096879696,0.000090730784,0.00032223077,0.0007215937],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00078513863,0.00012253861,0.00012494087,0.0005608428,0.0005407265,0.0010033093,0.000103174316,0.0002150509,0.0016638396],"category_scores_gemma":[0.0029782988,0.0001185457,0.00019866854,0.0004747746,0.00050609873,0.0002735693,0.00043155273,0.00060624466,0.00013348224],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039248887,0.00015712346,0.98656285,0.000015911124,0.000010364039,0.0001895804,0.005152578,0.00006625629,0.00033037973,0.00015420454,0.00007143096,0.007250085],"study_design_scores_gemma":[0.0000017046651,0.00008359566,0.9907787,0.000022338601,0.0000068185827,0.00006340571,0.00853477,0.00016815885,0.000063763226,0.000041128533,0.00023209504,0.0000035221174],"about_ca_topic_score_codex":0.0074684652,"about_ca_topic_score_gemma":0.020585513,"teacher_disagreement_score":0.0074684652,"about_ca_system_score_codex":0.0006039747,"about_ca_system_score_gemma":0.001189956,"threshold_uncertainty_score":0.014849961},"labels":[],"label_agreement":null},{"id":"W1567235179","doi":"","title":"Étude exploratoire des pratiques de la gestion de projet au sein des PME québécoises","year":2009,"lang":"fr","type":"article","venue":"Sémaphore (Université du Québec à Rimouski)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.03393511240722714,"score_gpt":0.27685103732587185,"score_spread":0.24291592491864472,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1567235179","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9318837,0.0009553378,0.004076329,0.0034614578,0.00006018666,0.000120962126,0.00050349,0.00006843621,0.058870204],"genre_scores_gemma":[0.911493,0.0007957619,0.0029853499,0.00039048583,0.0000073296783,0.00013065076,0.00032155367,0.000037069785,0.08383877],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99841154,0.0006106452,0.0000281443,0.00022142888,0.00039540842,0.00033294442],"domain_scores_gemma":[0.9964405,0.0013348509,0.00029629405,0.00013588948,0.0009923332,0.000800189],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002215757,0.0004105424,0.00035955783,0.0011914024,0.0078111202,0.0052202865,0.001001375,0.0009905838,0.01102556],"category_scores_gemma":[0.005287896,0.00033527883,0.00031294712,0.0023855418,0.003090319,0.002390291,0.002097627,0.0020107545,0.0009848361],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014396178,0.00022373364,0.08138287,0.0002992885,0.000048386948,0.0020435948,0.7611633,0.0011302109,0.0028978272,0.025697349,0.012868698,0.11210078],"study_design_scores_gemma":[0.00001911616,0.0001442945,0.15679397,0.00042463795,0.000030721076,0.00030028046,0.67521733,0.0021649327,0.00078277086,0.0024239565,0.16162103,0.000076912154],"about_ca_topic_score_codex":0.8000463,"about_ca_topic_score_gemma":0.91668916,"teacher_disagreement_score":0.19995368,"about_ca_system_score_codex":0.02047979,"about_ca_system_score_gemma":0.026658792,"threshold_uncertainty_score":0.40226245},"labels":[],"label_agreement":null},{"id":"W1570478422","doi":"10.1108/17538371111164092","title":"The empirical relationship between success factors and dimensions","year":2011,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; Université du Québec en Outaouais","funders":"","keywords":"Critical success factor; Confirmatory factor analysis; Project management; Project team; Structural equation modeling; Set (abstract data type); Task (project management); Process management; Psychology; Knowledge management; Business; Management; Computer science; Economics","score_opus":0.41825967714761725,"score_gpt":0.4273654093400186,"score_spread":0.00910573219240135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1570478422","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9790227,0.00036812582,0.0037524384,0.0004500189,0.000028050426,0.00014031676,0.00028527845,0.0000627098,0.015890323],"genre_scores_gemma":[0.99780136,0.000094561045,0.0016599565,0.00001687701,0.000008528245,0.00006025243,0.00011116265,0.000008691526,0.00023857108],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9920861,0.0023205352,0.0009071362,0.00082024076,0.002742749,0.0011233345],"domain_scores_gemma":[0.87196434,0.06886576,0.02533782,0.0077692308,0.013764996,0.012297863],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006505989,0.0007174863,0.00047467012,0.00486074,0.0012030322,0.0041701216,0.0006598413,0.00054953207,0.0041996543],"category_scores_gemma":[0.050190113,0.0003890223,0.00060833246,0.004005603,0.0025181463,0.0019098832,0.0027486167,0.0014278323,0.0004457911],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000076341305,0.00020288992,0.9448334,0.00017772464,0.00011165328,0.000061410676,0.0031919978,0.00040607367,0.00039155805,0.005042353,0.0005146894,0.044989936],"study_design_scores_gemma":[0.000012471835,0.00023705889,0.9820625,0.00020011404,0.000037399222,0.00012966598,0.0071645826,0.001360307,0.00046297302,0.0050941706,0.0031976334,0.000040989704],"about_ca_topic_score_codex":0.0026656408,"about_ca_topic_score_gemma":0.0026521776,"teacher_disagreement_score":0.006505989,"about_ca_system_score_codex":0.0015878478,"about_ca_system_score_gemma":0.00370347,"threshold_uncertainty_score":0.034407377},"labels":[],"label_agreement":null},{"id":"W1572445704","doi":"10.5539/ass.v11n18p246","title":"An Assistive and Research Framework Methodology for Ships’ Upkeep and Repair Organisational Learning Performance","year":2015,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Mediation; Population; Knowledge management; Process management; Engineering; Computer science; Sociology","score_opus":0.4446923490898688,"score_gpt":0.5292398769145069,"score_spread":0.08454752782463809,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1572445704","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015352539,0.0017436203,0.9203542,0.0049113855,0.00031190185,0.007484562,0.00082784635,0.00020238127,0.04881167],"genre_scores_gemma":[0.13636678,0.0011524174,0.8431754,0.0005366419,0.00007425739,0.013751889,0.000334692,0.000059618746,0.004548325],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9544282,0.036746554,0.0017712635,0.0019802176,0.0043056053,0.00076803897],"domain_scores_gemma":[0.9735015,0.019204162,0.0013886119,0.002110867,0.0033137007,0.00048105643],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.052829508,0.0016551898,0.0011848548,0.01010854,0.0034717973,0.008714025,0.0030167028,0.0020562187,0.006908554],"category_scores_gemma":[0.022876812,0.0005333984,0.0018190597,0.008592883,0.010974271,0.0066433153,0.0046340995,0.0028756424,0.0010856863],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036434896,0.00020602538,0.001664254,0.0018853396,0.0000573588,0.0003228367,0.038347755,0.001626276,0.000983067,0.860575,0.0036732375,0.09062242],"study_design_scores_gemma":[0.00015558394,0.0006862035,0.0077149873,0.0055478876,0.00017986231,0.0006932684,0.104406714,0.015974656,0.0031293773,0.6299496,0.23142378,0.00013809197],"about_ca_topic_score_codex":0.0039729527,"about_ca_topic_score_gemma":0.0050067315,"teacher_disagreement_score":0.052829508,"about_ca_system_score_codex":0.01020866,"about_ca_system_score_gemma":0.012430661,"threshold_uncertainty_score":0.27939248},"labels":[],"label_agreement":null},{"id":"W1581171909","doi":"10.4102/jtscm.v3i1.53","title":"Validating an integrated decision-support framework for road transportation in Gauteng, South Africa","year":2009,"lang":"en","type":"article","venue":"Journal of Transport and Supply Chain Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Government (linguistics); Sustainability; Business; Decision support system; Public transport; Local government; Process management; Transport engineering; Environmental economics; Computer science; Engineering; Economics; Public administration; Political science","score_opus":0.047024708876277646,"score_gpt":0.3309546744952419,"score_spread":0.2839299656189643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1581171909","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6864634,0.00029764965,0.2848649,0.0020875777,0.000042619493,0.0030064357,0.0012666268,0.000529631,0.02144118],"genre_scores_gemma":[0.79068226,0.00014893395,0.20752658,0.000059083963,0.0000041410253,0.00051367935,0.0004916965,0.000022081835,0.0005516146],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9959401,0.002463061,0.00031615005,0.00035033334,0.0005468838,0.00038346532],"domain_scores_gemma":[0.99540037,0.0030223953,0.00028736927,0.00018367269,0.0008685915,0.00023758519],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0081542395,0.0011980514,0.00066045154,0.0031592636,0.0018353,0.00486367,0.0017768955,0.0013822088,0.0025694147],"category_scores_gemma":[0.0119356755,0.00051163696,0.0007994408,0.0023359838,0.0016733418,0.0033687684,0.0027725988,0.0011604871,0.00022291676],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032871062,0.00070387684,0.013918413,0.00057195453,0.00015637337,0.0015826426,0.006337454,0.78951985,0.0045014233,0.11468797,0.001310705,0.06638067],"study_design_scores_gemma":[0.00017621524,0.00037680162,0.0054868744,0.0005977965,0.00010318763,0.000121480545,0.0118528865,0.94230074,0.0033926703,0.02561154,0.009888802,0.00009109812],"about_ca_topic_score_codex":0.07284854,"about_ca_topic_score_gemma":0.086942926,"teacher_disagreement_score":0.07284854,"about_ca_system_score_codex":0.01122258,"about_ca_system_score_gemma":0.011681201,"threshold_uncertainty_score":0.14484906},"labels":[],"label_agreement":null},{"id":"W1584130781","doi":"10.21432/t2c30f","title":"A Symbiosis Between Instructional Systems Design and Project Management / Une symbiose de la conception de matériel pédagogique et de la gestion de projet","year":2012,"lang":"fr","type":"article","venue":"Canadian Journal of Learning and Technology","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Humanities; Library science; Computer science; Philosophy","score_opus":0.03595394068731689,"score_gpt":0.3387141097837923,"score_spread":0.3027601690964754,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1584130781","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07823263,0.0046126395,0.7845075,0.025597706,0.00032513577,0.00045404042,0.000045841763,0.00029700095,0.10592749],"genre_scores_gemma":[0.67029846,0.0024975338,0.30692333,0.0013141996,0.00013695672,0.00079414813,0.000052715877,0.00011711959,0.017865542],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.97247046,0.020036722,0.0012251703,0.0015172795,0.0039627245,0.0007876675],"domain_scores_gemma":[0.9796697,0.011639757,0.0018092673,0.002857373,0.0023482186,0.0016757196],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020143328,0.0006355434,0.00049625465,0.0026322247,0.0025128257,0.013545133,0.0018058101,0.002202848,0.0030524852],"category_scores_gemma":[0.016497565,0.0008526889,0.0006486301,0.0017245298,0.022110444,0.009336433,0.007175214,0.004473023,0.0005449984],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028958628,0.00015846644,0.003467147,0.0004478996,0.000029303113,0.00014902055,0.024793258,0.002805042,0.0014916473,0.86793715,0.0010277996,0.09766436],"study_design_scores_gemma":[0.000085304346,0.0004872044,0.0043837735,0.0016035291,0.00004556034,0.0008432407,0.027086329,0.011790797,0.0041953065,0.70490324,0.24447395,0.00010170731],"about_ca_topic_score_codex":0.0020390819,"about_ca_topic_score_gemma":0.0017921448,"teacher_disagreement_score":0.020143328,"about_ca_system_score_codex":0.007848556,"about_ca_system_score_gemma":0.015571661,"threshold_uncertainty_score":0.106529355},"labels":[],"label_agreement":null},{"id":"W1584580833","doi":"10.3384/diss.diva-105481","title":"Liminality at Work : Mobile Project Workers In-Between","year":2014,"lang":"en","type":"book","venue":"Linköping University Electronic Press eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Engineering Link (Canada)","funders":"","keywords":"Liminality; Competence (human resources); Ambiguity; Work (physics); Public relations; Psychology; Sociology; Engineering; Computer science; Social psychology; Political science","score_opus":0.08532722398578778,"score_gpt":0.31198066778262734,"score_spread":0.22665344379683955,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1584580833","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30174568,0.016970556,0.026497778,0.02055105,0.0005182742,0.0001730652,0.000061232226,0.00016693718,0.6333153],"genre_scores_gemma":[0.918174,0.007823074,0.0040730084,0.0011726549,0.00013347634,0.00012349572,0.000043287248,0.000059364356,0.068397656],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.997607,0.0013526567,0.00005303871,0.0002387704,0.0003919449,0.00035649096],"domain_scores_gemma":[0.99837816,0.0009150965,0.00016903966,0.00010435128,0.0001064138,0.00032699356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020780435,0.0004385202,0.00033664695,0.00081457815,0.0041546,0.010231141,0.0011320733,0.0015291825,0.005539353],"category_scores_gemma":[0.003266923,0.00023639554,0.00024244263,0.0011929441,0.0078218635,0.006147049,0.006429501,0.0019246908,0.0016484093],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011562516,0.00020466483,0.0049291193,0.0004281174,0.000013079344,0.0020947885,0.4766665,0.00053909526,0.0015023211,0.24372908,0.025211228,0.24456644],"study_design_scores_gemma":[0.000018428002,0.00027444668,0.0064654206,0.0012371693,0.0000136693325,0.0021113367,0.36638102,0.0009844919,0.0007193656,0.06770965,0.5540322,0.000052856733],"about_ca_topic_score_codex":0.0018318049,"about_ca_topic_score_gemma":0.002770387,"teacher_disagreement_score":0.010231141,"about_ca_system_score_codex":0.0019446968,"about_ca_system_score_gemma":0.0022249657,"threshold_uncertainty_score":0.018531024},"labels":[],"label_agreement":null},{"id":"W1585730397","doi":"10.5539/ass.v11n21p102","title":"Influence of Organizational Leadership on Knowledge Transfer in Construction","year":2015,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Multinational corporation; Knowledge management; Organizational learning; Knowledge transfer; Structural equation modeling; Business; Organizational performance; Process (computing); Computer science","score_opus":0.14257239605357175,"score_gpt":0.368986082413103,"score_spread":0.22641368635953124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1585730397","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98496914,0.00013484247,0.00038671275,0.00047699737,0.000017362372,0.00001845397,0.000008135127,0.0000063379885,0.013982006],"genre_scores_gemma":[0.99953175,0.000046515346,0.000055723212,0.00002164126,0.0000048138795,0.000002993504,0.0000031156387,6.110637e-7,0.00033292815],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9972868,0.0013883656,0.000077326426,0.000109547844,0.00054617703,0.00059189275],"domain_scores_gemma":[0.9901468,0.0038951659,0.0017680747,0.00028404384,0.0012749633,0.0026309502],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020361906,0.00014588913,0.00011029289,0.00057963165,0.0009923044,0.0015439793,0.00014990829,0.00027417822,0.0024855267],"category_scores_gemma":[0.006647337,0.00007270761,0.00016860821,0.00030089507,0.00087379426,0.0003168783,0.0008297292,0.00046893672,0.00021664814],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027730654,0.0015511038,0.859109,0.00017154335,0.00013206656,0.0015117835,0.01850042,0.00094175525,0.0035361776,0.0050224694,0.002228191,0.10701813],"study_design_scores_gemma":[0.00003259081,0.00056179304,0.9734128,0.00009963995,0.000054408672,0.00025537543,0.017880976,0.0012448955,0.0011178467,0.0013129709,0.004006134,0.000020604579],"about_ca_topic_score_codex":0.0016648528,"about_ca_topic_score_gemma":0.0031893556,"teacher_disagreement_score":0.0024855267,"about_ca_system_score_codex":0.0009240892,"about_ca_system_score_gemma":0.0022389202,"threshold_uncertainty_score":0.010768473},"labels":[],"label_agreement":null},{"id":"W1586506871","doi":"10.1108/17538371011014035","title":"Project management in the international development industry","year":2010,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":139,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; Université du Québec en Outaouais","funders":"","keywords":"Project management; Business; OPM3; Process management; Project management triangle; Project charter; Extreme project management; Project stakeholder; Engineering management; Environmental resource management; Operations management; Management; Engineering; Economics","score_opus":0.09439305743202943,"score_gpt":0.3929480407460611,"score_spread":0.2985549833140317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1586506871","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86337,0.003831188,0.006847518,0.0051672356,0.00016752462,0.00061622023,0.00014596687,0.00008907319,0.119765215],"genre_scores_gemma":[0.9905834,0.001423026,0.002366368,0.0001487118,0.000022721248,0.00015314123,0.00005976121,0.000010471344,0.005232477],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9877814,0.008988971,0.00044524402,0.00046412088,0.001103825,0.0012165356],"domain_scores_gemma":[0.98050517,0.0067543923,0.0034330387,0.0014853132,0.0037417966,0.0040802453],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012809348,0.00040115544,0.00019213698,0.0025345786,0.00344963,0.004390256,0.0007915078,0.0005884635,0.006431298],"category_scores_gemma":[0.017102038,0.0002804125,0.00013961903,0.004266966,0.0020306797,0.0013774834,0.0044597276,0.001110396,0.00075809116],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002981096,0.0010883835,0.31628823,0.0009164208,0.000059295922,0.0012646033,0.046947706,0.002198813,0.0013736102,0.028254706,0.012248297,0.58906186],"study_design_scores_gemma":[0.00010164914,0.0013572245,0.4508491,0.0011869463,0.000048438604,0.0019934038,0.22063503,0.003108078,0.0026811059,0.010097865,0.3078786,0.00006264338],"about_ca_topic_score_codex":0.0029767957,"about_ca_topic_score_gemma":0.0024548688,"teacher_disagreement_score":0.012809348,"about_ca_system_score_codex":0.0035263025,"about_ca_system_score_gemma":0.008732042,"threshold_uncertainty_score":0.06774312},"labels":[],"label_agreement":null},{"id":"W1588170552","doi":"10.1108/17538370810866313","title":"Collaborative academic/practitioner research in project management","year":2008,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"","keywords":"Value proposition; Proposition; Stakeholder; Originality; Value (mathematics); Knowledge management; Stakeholder engagement; Sociology; Public relations; Business; Marketing; Computer science; Political science; Qualitative research","score_opus":0.25355122622545073,"score_gpt":0.48809229013263666,"score_spread":0.23454106390718593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1588170552","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.113884926,0.05143115,0.2364535,0.121557266,0.003802268,0.0027389298,0.00013718288,0.00035924008,0.46963552],"genre_scores_gemma":[0.8761834,0.014024996,0.08292321,0.0065568546,0.00093398464,0.0021261852,0.00007234646,0.00012850596,0.0170505],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.7509729,0.21737738,0.0045083473,0.0040925425,0.018936332,0.004112441],"domain_scores_gemma":[0.6326112,0.30397248,0.010755455,0.024176512,0.017578943,0.010905421],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.13388695,0.0007799921,0.0012188752,0.007194942,0.008738207,0.020956447,0.0034738898,0.007725026,0.011917408],"category_scores_gemma":[0.14210434,0.00066227856,0.00074765773,0.010193691,0.019780776,0.0143037,0.015781539,0.004661482,0.002312008],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015410582,0.00058101356,0.0033799976,0.0031445592,0.00006950142,0.0005533841,0.050366428,0.0013344343,0.00037545033,0.6979788,0.014757717,0.22730453],"study_design_scores_gemma":[0.00019547495,0.00080695003,0.003632191,0.005103699,0.000065459855,0.0017605735,0.13217694,0.0038534973,0.0011019201,0.48252586,0.36869758,0.000079840676],"about_ca_topic_score_codex":0.0008275463,"about_ca_topic_score_gemma":0.0010032271,"teacher_disagreement_score":0.13388695,"about_ca_system_score_codex":0.00930435,"about_ca_system_score_gemma":0.016956028,"threshold_uncertainty_score":0.7080703},"labels":[],"label_agreement":null},{"id":"W1588711441","doi":"","title":"Mass-matching: developing a quasi-game toolkit for a customer-driven design process in building industry","year":2009,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Matching (statistics); Process (computing); Computer science; Process management; Business; Mathematics; Programming language","score_opus":0.1677574896409465,"score_gpt":0.42699128120073254,"score_spread":0.25923379155978604,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1588711441","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011465343,0.00001684455,0.9802752,0.000085893145,0.00002524103,0.00036179324,0.00005898319,0.0041101826,0.0036005022],"genre_scores_gemma":[0.11912979,0.000029885416,0.87312067,0.00009405573,0.0000072084113,0.00077688316,0.0001596348,0.00080410205,0.0058778054],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987618,0.00070082356,0.000068806155,0.00016017283,0.00020693419,0.00010153396],"domain_scores_gemma":[0.99696285,0.0022035514,0.00010979398,0.00028515814,0.00020600867,0.00023268047],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031452507,0.00092554756,0.00046809867,0.00052803726,0.00069728214,0.0017675379,0.0035403883,0.0013203407,0.014067245],"category_scores_gemma":[0.0070445943,0.00082698977,0.0008368718,0.0002260075,0.0010444709,0.0021445286,0.0039903997,0.0013173926,0.0023651628],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017022626,0.0025902693,0.006172917,0.0016347143,0.0002249052,0.0010276746,0.007998823,0.26881984,0.07009086,0.2424284,0.015449379,0.38185993],"study_design_scores_gemma":[0.00018199919,0.0003718318,0.0005561296,0.00008880317,0.000038199636,0.00019633741,0.0004490849,0.9084142,0.012325851,0.04830621,0.0290049,0.000066481654],"about_ca_topic_score_codex":0.0016323428,"about_ca_topic_score_gemma":0.0031089745,"teacher_disagreement_score":0.014067245,"about_ca_system_score_codex":0.00069694896,"about_ca_system_score_gemma":0.0014034937,"threshold_uncertainty_score":0.047059596},"labels":[],"label_agreement":null},{"id":"W1590678790","doi":"10.1108/17542731311314908","title":"Journey to excellence","year":2013,"lang":"en","type":"article","venue":"The TQM Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Government of Alberta","funders":"","keywords":"Excellence; Quality (philosophy); Originality; Government (linguistics); General partnership; Operational excellence; Quality management; Total quality management; Public relations; Management; Business; Process management; Marketing; Political science; Sociology; Economics; Qualitative research; Service (business); Finance","score_opus":0.18715995903301974,"score_gpt":0.3995976196208237,"score_spread":0.21243766058780394,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1590678790","genre_codex":"other","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01893545,0.014106708,0.014130539,0.3689717,0.010575844,0.0004971989,0.00058976887,0.00090853765,0.5712842],"genre_scores_gemma":[0.43656537,0.02382639,0.05803236,0.0842746,0.0026747293,0.00062257703,0.002055697,0.0012690328,0.39067924],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9770947,0.007472275,0.00091123005,0.001725274,0.007665705,0.005130827],"domain_scores_gemma":[0.96446025,0.002148552,0.00082044955,0.0021566695,0.009147105,0.021267032],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013489428,0.00092196447,0.0010780832,0.0015593517,0.014106409,0.02302234,0.0032824448,0.004520415,0.02431169],"category_scores_gemma":[0.022207597,0.00034811324,0.001169102,0.0016781419,0.012074711,0.010426389,0.024463348,0.012352809,0.014543279],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052795775,0.00022373727,0.00323461,0.00059512956,0.00005788945,0.0004307572,0.023162022,0.00038157462,0.0005155971,0.36322954,0.4657204,0.14239596],"study_design_scores_gemma":[0.000007869292,0.00005763552,0.0010841815,0.0005211702,0.000009149456,0.00028908873,0.01484007,0.00010032687,0.00014707459,0.04353686,0.939372,0.000034550176],"about_ca_topic_score_codex":0.027280051,"about_ca_topic_score_gemma":0.044196885,"teacher_disagreement_score":0.027280051,"about_ca_system_score_codex":0.0144138755,"about_ca_system_score_gemma":0.07561585,"threshold_uncertainty_score":0.10458052},"labels":[],"label_agreement":null},{"id":"W1593797138","doi":"10.5353/th_b4985873","title":"Modeling and evaluating multi-stakeholder multi-objective decisions during public participation in major infrastructure and construction projects","year":2013,"lang":"en","type":"dissertation","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Stakeholder; Process (computing); Citizen journalism; Public participation; Business; Project stakeholder; Plan (archaeology); Intervention (counseling); Process management; Stakeholder analysis; Stakeholder engagement; Public relations; Salient; Management science; Political science; Knowledge management; Engineering; Project management; Project planning; Project charter; Computer science; Psychology","score_opus":0.2332193199549422,"score_gpt":0.4196437217945981,"score_spread":0.1864244018396559,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1593797138","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6630177,0.001445981,0.31418982,0.0013584343,0.00010429735,0.0012185075,0.00032046778,0.00010009729,0.018244639],"genre_scores_gemma":[0.945553,0.00069781794,0.050703593,0.00006171359,0.000026244887,0.00084864564,0.00013316756,0.000020991083,0.0019548207],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9947654,0.0036597045,0.00019328637,0.00043405406,0.0004415151,0.00050606346],"domain_scores_gemma":[0.9864889,0.011319295,0.0009894874,0.00016989655,0.00068424834,0.00034811706],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009107868,0.0012869916,0.0012004982,0.001455738,0.001343646,0.0030905746,0.0015831995,0.0024929435,0.0023246352],"category_scores_gemma":[0.012941688,0.0008983061,0.0019213943,0.0014640054,0.0015267412,0.0026048522,0.0022612356,0.0016116144,0.00015182485],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008266412,0.00014207762,0.0032626926,0.00020177074,0.000063381754,0.00021258542,0.0006357123,0.97915524,0.00044840464,0.007977897,0.00015492165,0.007662646],"study_design_scores_gemma":[0.000014181959,0.00011848279,0.00084047293,0.000042018437,0.000027010388,0.000015931466,0.0007175627,0.99284655,0.00023670866,0.0046845507,0.0004363767,0.000020096282],"about_ca_topic_score_codex":0.015910408,"about_ca_topic_score_gemma":0.016707469,"teacher_disagreement_score":0.015910408,"about_ca_system_score_codex":0.003596968,"about_ca_system_score_gemma":0.004285841,"threshold_uncertainty_score":0.048167586},"labels":[],"label_agreement":null},{"id":"W1594788842","doi":"","title":"La relation entre le style de leadership et la performance d'une équipe de projet","year":2012,"lang":"fr","type":"article","venue":"Sémaphore (Université du Québec à Rimouski)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Université du Québec à Rimouski","keywords":"Leadership style; Humanities; Political science; Management; Sociology; Public relations; Philosophy","score_opus":0.037680713482140735,"score_gpt":0.2617328716216281,"score_spread":0.22405215813948737,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1594788842","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9889893,0.00017251303,0.0013364927,0.0004009694,0.0000394903,0.00005307437,0.00023667284,0.000032721036,0.008738697],"genre_scores_gemma":[0.9963678,0.00012297387,0.0007946975,0.00004480978,0.000030067029,0.00007391894,0.00016441758,0.000009280982,0.0023919963],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9944502,0.0026830146,0.00042066,0.0002992113,0.0016656342,0.0004814084],"domain_scores_gemma":[0.9410718,0.027251419,0.012533713,0.0014701567,0.009635313,0.008037564],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004883568,0.00028442626,0.00021649904,0.00093456666,0.0004334542,0.0016469873,0.0003652288,0.00039745777,0.009719109],"category_scores_gemma":[0.026175449,0.00015358465,0.00036284336,0.00072907977,0.0005677322,0.00069959485,0.0011415004,0.0007699439,0.0013199275],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027693814,0.0004865805,0.9361299,0.0002466705,0.00012924998,0.0001596117,0.0033776672,0.00081034517,0.0015469928,0.00053366926,0.0020363152,0.054266147],"study_design_scores_gemma":[0.000013276009,0.00047475708,0.9938415,0.000080777536,0.000021117125,0.0000826526,0.002456779,0.0006777031,0.00040901045,0.0002046729,0.0017219308,0.000015733209],"about_ca_topic_score_codex":0.0012917755,"about_ca_topic_score_gemma":0.0017458434,"teacher_disagreement_score":0.009719109,"about_ca_system_score_codex":0.00071066694,"about_ca_system_score_gemma":0.0009614318,"threshold_uncertainty_score":0.03251362},"labels":[],"label_agreement":null},{"id":"W1594850400","doi":"10.1108/17538371211269040","title":"Critical success factors in projects","year":2012,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":379,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"","keywords":"Critical success factor; Originality; Popularity; Project management; Value (mathematics); Success factors; Diversity (politics); Sociology; Management; Marketing; Psychology; Computer science; Creativity; Business; Social psychology; Economics","score_opus":0.11569781982554615,"score_gpt":0.4128198740750051,"score_spread":0.2971220542494589,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1594850400","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6005894,0.0065103546,0.025279509,0.009857374,0.0005391177,0.0011849414,0.0003446476,0.00025427167,0.35544035],"genre_scores_gemma":[0.9908021,0.0010589857,0.0035224312,0.00018901519,0.00009246534,0.0002510328,0.00007288707,0.000048688835,0.003962378],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9854575,0.0049815043,0.0010079202,0.0010677504,0.006083395,0.0014019563],"domain_scores_gemma":[0.8878869,0.05233591,0.017654633,0.0028698244,0.020828307,0.018424526],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010764324,0.0008819649,0.0004484374,0.0072693955,0.003886285,0.010647079,0.0009187003,0.0007767255,0.011908068],"category_scores_gemma":[0.07082113,0.00040687277,0.000488998,0.0047660125,0.006887984,0.0042833653,0.0046462324,0.00212655,0.0009811732],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005311683,0.0006786338,0.25539264,0.002273918,0.0002707406,0.0012922323,0.05745605,0.0028985029,0.0014663552,0.29080215,0.029391464,0.3575462],"study_design_scores_gemma":[0.00014505771,0.0012969272,0.3572755,0.003947546,0.00020457285,0.0024526136,0.113262706,0.0049760602,0.0024240168,0.22265907,0.2909925,0.00036347302],"about_ca_topic_score_codex":0.004301879,"about_ca_topic_score_gemma":0.0027440994,"teacher_disagreement_score":0.011908068,"about_ca_system_score_codex":0.0066773486,"about_ca_system_score_gemma":0.008751545,"threshold_uncertainty_score":0.05692792},"labels":[],"label_agreement":null},{"id":"W1596607210","doi":"10.1002/9780470773765.ch4","title":"The International Demand for Improvement","year":2004,"lang":"en","type":"other","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business","score_opus":0.05552754913055785,"score_gpt":0.36638095758921563,"score_spread":0.3108534084586578,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1596607210","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031485811,0.03748262,0.0006268109,0.14738822,0.0042057964,0.000013923153,0.0008406443,0.000109752255,0.8061837],"genre_scores_gemma":[0.20031305,0.10642371,0.0038443522,0.037792265,0.00632692,0.00014258221,0.00213191,0.0003346245,0.64269054],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99819833,0.00031613823,0.00009501593,0.00027606118,0.00078351493,0.00033110316],"domain_scores_gemma":[0.99789065,0.00059960084,0.00024877355,0.0003237145,0.0005913413,0.0003459895],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019003557,0.00051865337,0.0006189541,0.0014464946,0.0013621269,0.007582819,0.0005341455,0.002743962,0.08584343],"category_scores_gemma":[0.0036072242,0.00022851148,0.00045917608,0.0038658474,0.0019357316,0.0056423205,0.002354095,0.003531222,0.013185265],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005725313,0.000029693865,0.0010565545,0.0003957457,0.000014278094,0.00006677872,0.00059921487,0.00029796487,0.00041278353,0.46324965,0.37792733,0.15589283],"study_design_scores_gemma":[0.000006131277,0.000010895381,0.0017696137,0.0002451086,0.0000036715235,0.000043220687,0.0004121039,0.00007138735,0.000054180135,0.013944001,0.98343444,0.000005201072],"about_ca_topic_score_codex":0.005836601,"about_ca_topic_score_gemma":0.0074811513,"teacher_disagreement_score":0.08584343,"about_ca_system_score_codex":0.0035129285,"about_ca_system_score_gemma":0.0050629014,"threshold_uncertainty_score":0.28717488},"labels":[],"label_agreement":null},{"id":"W1597887249","doi":"10.1108/17538371211214905","title":"Marketing and technology strategies for innovative performance","year":2012,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; Université du Québec à Montréal","funders":"","keywords":"Marketing; Originality; Business; Knowledge management; Survey data collection; Computer science; Creativity; Psychology","score_opus":0.0705077515778685,"score_gpt":0.3725922320667245,"score_spread":0.302084480488856,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1597887249","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8157627,0.0031427722,0.00963512,0.0043938463,0.00005909029,0.00031277473,0.00014498585,0.00008391258,0.16646475],"genre_scores_gemma":[0.9960426,0.0005266728,0.0017650906,0.00015827149,0.000034391986,0.0000482698,0.000023735369,0.000007809005,0.0013931186],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.997633,0.0011611586,0.000137564,0.0001898468,0.00049892487,0.00037955877],"domain_scores_gemma":[0.98439956,0.0068996386,0.0052633146,0.0007321661,0.0010070007,0.0016982541],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031940402,0.0005168055,0.00029514136,0.0017847228,0.0006639282,0.0064081587,0.00042351117,0.0006455671,0.010159789],"category_scores_gemma":[0.011393504,0.00018661807,0.0005061696,0.0018518127,0.002272175,0.0025897326,0.0021245426,0.0009933349,0.00088280364],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026227385,0.0014664072,0.4987799,0.0011582383,0.0004036042,0.00082604587,0.0055991146,0.0056949575,0.004996134,0.20388103,0.0029282295,0.2740042],"study_design_scores_gemma":[0.00007752873,0.0011314357,0.7735549,0.00093474844,0.0002649712,0.0013393058,0.017409304,0.012622011,0.004379871,0.14561442,0.042566195,0.00010535545],"about_ca_topic_score_codex":0.00040434345,"about_ca_topic_score_gemma":0.0003587272,"teacher_disagreement_score":0.010159789,"about_ca_system_score_codex":0.0016331482,"about_ca_system_score_gemma":0.0025464247,"threshold_uncertainty_score":0.03398788},"labels":[],"label_agreement":null},{"id":"W1608172162","doi":"10.11575/prism/30203","title":"Through the Looking Glass: Examining Theory Development in Project Management with the Resource-Based View Lens.","year":2004,"lang":"en","type":"article","venue":"PRISM (University of Calgary)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"","keywords":"Lens (geology); Project management; Resource (disambiguation); Development theory; Development (topology); Process management; Through-the-lens metering; Sociology; Engineering ethics; Management science; Knowledge management; Business; Engineering; Computer science; Economics; Systems engineering; Economic growth","score_opus":0.05191078040326185,"score_gpt":0.2598163349217863,"score_spread":0.20790555451852444,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1608172162","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31023464,0.053908363,0.17513053,0.1551317,0.0018589568,0.0010795653,0.00034343437,0.00035391218,0.30195892],"genre_scores_gemma":[0.88292634,0.010179616,0.09018241,0.006102041,0.00008060291,0.0007069582,0.0001257444,0.00012282532,0.009573536],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9773006,0.01949351,0.0003815871,0.00056628924,0.0016451495,0.000612886],"domain_scores_gemma":[0.9426587,0.049196284,0.0024835898,0.0013205804,0.0029568921,0.0013839761],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.039848324,0.00056639715,0.00042444823,0.0068700253,0.008261711,0.013136352,0.0020259744,0.0024306665,0.004617828],"category_scores_gemma":[0.05327952,0.00059709715,0.0006692564,0.0069479,0.031138351,0.01695385,0.009428746,0.0054390584,0.0006461531],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043858516,0.00012938831,0.007743789,0.0008561797,0.000036134363,0.00040794077,0.32911816,0.0007413035,0.00043990742,0.52134424,0.00875646,0.13038267],"study_design_scores_gemma":[0.000066566456,0.00018780389,0.011413503,0.0046144957,0.00006860879,0.00032777188,0.37318596,0.0029124722,0.0013252486,0.53525776,0.070578374,0.000061405466],"about_ca_topic_score_codex":0.020858048,"about_ca_topic_score_gemma":0.028493665,"teacher_disagreement_score":0.039848324,"about_ca_system_score_codex":0.012472497,"about_ca_system_score_gemma":0.020485986,"threshold_uncertainty_score":0.21074063},"labels":[],"label_agreement":null},{"id":"W161481390","doi":"","title":"Nano Risk Governance: Current Developments and Future Perspectives","year":2009,"lang":"en","type":"article","venue":"Technical University of Denmark, DTU Orbit (Technical University of Denmark, DTU)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Risk governance; Corporate governance; Risk analysis (engineering); Risk assessment; Management science; Risk management; Regulatory science; Computer science; Engineering; Business; Medicine","score_opus":0.022526816822306648,"score_gpt":0.26961282205318404,"score_spread":0.2470860052308774,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W161481390","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0070056766,0.5508737,0.023021499,0.35337642,0.002352392,0.00006244133,0.000109357425,0.00011130213,0.063087195],"genre_scores_gemma":[0.24258621,0.68891764,0.022267302,0.02605697,0.008041951,0.00028228515,0.00017851105,0.00006333031,0.011605872],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9957908,0.0020803371,0.00022694832,0.00040670836,0.0008871323,0.00060813926],"domain_scores_gemma":[0.9833093,0.010427861,0.0010257174,0.0006312193,0.0029310924,0.001674793],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014266764,0.00069465855,0.0011580361,0.0019705174,0.0017955729,0.013250233,0.0025341492,0.008269502,0.009816489],"category_scores_gemma":[0.008456344,0.00037501918,0.0008522203,0.0034067316,0.009050746,0.01462177,0.0042693815,0.00491396,0.0014411543],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001444229,0.00025198984,0.0017913851,0.0019168823,0.000036770474,0.00032888842,0.0013391187,0.003834335,0.0002783397,0.6921113,0.025780255,0.2721863],"study_design_scores_gemma":[0.000040288607,0.00017409533,0.0013274514,0.0040837857,0.000026086609,0.00038123396,0.010257657,0.0037477051,0.00040652548,0.6848333,0.29464024,0.000081568294],"about_ca_topic_score_codex":0.0030904498,"about_ca_topic_score_gemma":0.004225787,"teacher_disagreement_score":0.014266764,"about_ca_system_score_codex":0.00544232,"about_ca_system_score_gemma":0.0097009605,"threshold_uncertainty_score":0.07545072},"labels":[],"label_agreement":null},{"id":"W1643362493","doi":"10.17226/22675","title":"Transforming Public Transportation Institutional and Business Models","year":2012,"lang":"en","type":"book","venue":"Transportation Research Board eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Business model; Marketing","score_opus":0.27476190558031577,"score_gpt":0.3988769698404856,"score_spread":0.12411506426016983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1643362493","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.208458,0.00088052225,0.18539041,0.030819783,0.00043376136,0.00077243446,0.00046788654,0.0011736513,0.57160354],"genre_scores_gemma":[0.9394526,0.0010089946,0.026488354,0.0005420145,0.000061381244,0.0002780844,0.0002594473,0.00014013815,0.031768933],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99333656,0.0029756783,0.0001850163,0.0004698014,0.0018676355,0.0011653707],"domain_scores_gemma":[0.99498713,0.0008552945,0.00041691575,0.0010652802,0.0018610826,0.00081420445],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005087144,0.00055531424,0.0002644193,0.0023687996,0.0041594426,0.014428127,0.0027042273,0.0014437593,0.005754323],"category_scores_gemma":[0.007175673,0.00044884154,0.0005703594,0.0031364574,0.010257123,0.010139549,0.006695825,0.0024536124,0.0011826053],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027323815,0.00018589356,0.0047007645,0.000078399135,0.000015867197,0.00028662095,0.012309299,0.011344903,0.0004388536,0.9120483,0.009363586,0.04920022],"study_design_scores_gemma":[0.000035895948,0.0002081779,0.0038159455,0.00038570366,0.000036140482,0.0005194711,0.11024451,0.027447848,0.0010920508,0.2101403,0.64596146,0.000112508096],"about_ca_topic_score_codex":0.084832735,"about_ca_topic_score_gemma":0.08616216,"teacher_disagreement_score":0.084832735,"about_ca_system_score_codex":0.029474568,"about_ca_system_score_gemma":0.029941322,"threshold_uncertainty_score":0.21385396},"labels":[],"label_agreement":null},{"id":"W1679301285","doi":"10.1109/nafips-wconsc.2015.7284152","title":"Fuzzy Contingency Determinator&lt;sup&gt;&amp;#x00A9;&lt;/sup&gt; a fuzzy arithmetic-based risk analysis tool for construction projects","year":2015,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Fuzzy logic; Contingency; Computer science; Probabilistic logic; Fuzzy number; Contingency table; Fuzzy set; Data mining; Operations research; Machine learning; Risk analysis (engineering); Artificial intelligence; Mathematics","score_opus":0.08708758085354774,"score_gpt":0.3463623843879235,"score_spread":0.25927480353437576,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1679301285","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0036740922,0.00005024195,0.9869034,0.00007182264,0.000026850448,0.000087965374,0.00017437954,0.0062131593,0.0027980146],"genre_scores_gemma":[0.06340289,0.000098571196,0.9324857,0.000032508462,0.000020430452,0.00018569146,0.00021514122,0.00048874633,0.00307034],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989084,0.00029297505,0.00007946935,0.00016939803,0.0004970061,0.000052713916],"domain_scores_gemma":[0.9979874,0.0012307365,0.0001483058,0.00018555524,0.00038286834,0.000065056425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023787005,0.0008386317,0.0006370801,0.0025793726,0.0010145869,0.001709582,0.00086088094,0.00058037793,0.014475757],"category_scores_gemma":[0.0065739215,0.0004980042,0.00066617865,0.0011765901,0.000840303,0.0018246572,0.00088986923,0.001352476,0.0022889203],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005331953,0.00009702747,0.0018694146,0.00046971042,0.00007881676,0.00051589636,0.0013703427,0.10768209,0.028507257,0.12165984,0.026447123,0.7107693],"study_design_scores_gemma":[0.00010008794,0.00017972995,0.001517922,0.00016561558,0.000059736176,0.00059469615,0.00021787119,0.8616806,0.030999104,0.044878542,0.05942047,0.0001856371],"about_ca_topic_score_codex":0.0031316665,"about_ca_topic_score_gemma":0.0028512934,"teacher_disagreement_score":0.014475757,"about_ca_system_score_codex":0.00089333794,"about_ca_system_score_gemma":0.0019832887,"threshold_uncertainty_score":0.04842627},"labels":[],"label_agreement":null},{"id":"W1728410617","doi":"10.1139/l2012-087","title":"Dynamics of workforce skill evolution in construction projects<sup>1</sup>This paper is one of a selection of papers in this Special Issue on Construction Engineering and Management.","year":2012,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Workforce; Workforce planning; Discrete event simulation; Perspective (graphical); Workforce management; Human resource management; Engineering; Construction management; Human resources; Resource (disambiguation); Engineering management; Computer science; Operations research; Operations management; Process management; Simulation; Knowledge management; Civil engineering; Management; Economics; Artificial intelligence","score_opus":0.013303441190420678,"score_gpt":0.22949308349286726,"score_spread":0.21618964230244658,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1728410617","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8670862,0.00020641611,0.1199066,0.00079105346,0.000028813984,0.000052213214,0.0003984018,0.00009011893,0.011440249],"genre_scores_gemma":[0.9904524,0.00015405517,0.0066868505,0.00002426932,0.000004105439,0.000042904972,0.0001474128,0.000015051871,0.0024728717],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99979025,0.0000725486,0.00001137715,0.00003761016,0.000049113845,0.000039205846],"domain_scores_gemma":[0.99884284,0.0006999693,0.00018592962,0.00004708166,0.00012989873,0.00009431688],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064212526,0.0002173545,0.00021366456,0.0003611198,0.00022318408,0.00063968234,0.00038621892,0.0005409626,0.0023129708],"category_scores_gemma":[0.0032994351,0.0002339339,0.00028771796,0.0004313804,0.00037543484,0.00059930445,0.00064244086,0.00039687738,0.00021298969],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052908894,0.000060551687,0.031349324,0.000033181324,0.00001903008,0.00015319481,0.00029965612,0.9366971,0.0023986634,0.013169902,0.0010455811,0.014720861],"study_design_scores_gemma":[0.000004950241,0.000035267713,0.009660953,0.000009546855,0.0000043013974,0.00003154682,0.0001629553,0.9837764,0.0004777811,0.004619242,0.0012045009,0.000012556119],"about_ca_topic_score_codex":0.010577299,"about_ca_topic_score_gemma":0.008076216,"teacher_disagreement_score":0.010577299,"about_ca_system_score_codex":0.0007894299,"about_ca_system_score_gemma":0.00060645357,"threshold_uncertainty_score":0.02103144},"labels":[],"label_agreement":null},{"id":"W174458835","doi":"10.4102/sajems.v4i2.2650","title":"Risk analysis and evaluation of capital investment projects","year":2001,"lang":"en","type":"article","venue":"South African Journal of Economic and Management Sciences","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Investment (military); Capital budgeting; Economic capital; Cash flow; Capital (architecture); Risk-adjusted return on capital; Business; Finance; Return on investment; Quarter (Canadian coin); Actuarial science; Capital investment; Return on capital employed; Empirical research; Cost of capital; Economics; Financial capital; Capital formation; Human capital; Economic growth; Macroeconomics; Microeconomics; Geography; Statistics; Production (economics)","score_opus":0.09255446914733016,"score_gpt":0.3426805484722087,"score_spread":0.2501260793248785,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W174458835","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2957326,0.005746882,0.6581806,0.00082227774,0.00011029967,0.0007443286,0.00038932342,0.00029289743,0.03798082],"genre_scores_gemma":[0.92053264,0.0014075169,0.074677676,0.00003289059,0.000049404956,0.0002669602,0.0001910692,0.000030853742,0.0028110247],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9830033,0.009255691,0.0009835873,0.0005093102,0.005821297,0.00042672578],"domain_scores_gemma":[0.97055817,0.019310882,0.0038715338,0.0009439169,0.0049499115,0.00036562796],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014214218,0.0010685887,0.0008021738,0.00680456,0.0004805287,0.00317929,0.00058621814,0.0007958345,0.002212766],"category_scores_gemma":[0.040800363,0.00028846395,0.0008137054,0.0025973618,0.0013327295,0.0027075808,0.0013500127,0.00059122127,0.00032425649],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010990141,0.00020128618,0.059781034,0.0014374825,0.00048440415,0.00066417886,0.0024255598,0.342413,0.006504396,0.10605956,0.0027504545,0.47617963],"study_design_scores_gemma":[0.00008449986,0.0015942348,0.07760842,0.00093291793,0.00033081454,0.0008913272,0.0040255175,0.709834,0.016006958,0.16885069,0.019427184,0.00041340975],"about_ca_topic_score_codex":0.0015574982,"about_ca_topic_score_gemma":0.001572919,"teacher_disagreement_score":0.014214218,"about_ca_system_score_codex":0.0016743763,"about_ca_system_score_gemma":0.0012925884,"threshold_uncertainty_score":0.07517284},"labels":[],"label_agreement":null},{"id":"W1759287410","doi":"10.1002/pmj.21521","title":"Does Executive Sponsorship Matter for Realizing Project Management Value?","year":2015,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"","keywords":"Sustainability; Value (mathematics); Business; Project management; Project stakeholder; Executive summary; Perception; Project sponsorship; Earned value management; OPM3; Project management triangle; Senior management; Public relations; Marketing; Process management; Knowledge management; Management; Psychology; Political science; Computer science; Economics","score_opus":0.15510992571442953,"score_gpt":0.40639970350821736,"score_spread":0.2512897777937878,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1759287410","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9861357,0.0003241908,0.0005104656,0.0024009782,0.000030964326,0.000014915392,0.00003205858,0.00000454156,0.01054618],"genre_scores_gemma":[0.9995479,0.000087357286,0.00008994938,0.000051747116,0.000020334659,0.000003544042,0.000015498721,0.0000015139773,0.00018205051],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9949827,0.002645853,0.00031567842,0.00023831225,0.001154741,0.0006627052],"domain_scores_gemma":[0.9159745,0.03640999,0.0297987,0.0021476308,0.0060435603,0.009625638],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009169181,0.00015534929,0.0002615943,0.0012878942,0.00069576805,0.0025857217,0.00040104627,0.0007513815,0.004690071],"category_scores_gemma":[0.07274514,0.0001771065,0.00020133908,0.0010273462,0.001973362,0.0027634534,0.001113261,0.0008904159,0.0004083058],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014834895,0.00029298084,0.95384043,0.00007748575,0.000042447875,0.00013036269,0.0032262506,0.00014258131,0.00020208248,0.0029871338,0.0012938109,0.037616163],"study_design_scores_gemma":[0.000023852741,0.00020917982,0.9756801,0.00015135293,0.000028169825,0.00026819724,0.015432494,0.0008571478,0.00016387721,0.004388718,0.002780376,0.000016457816],"about_ca_topic_score_codex":0.0012397079,"about_ca_topic_score_gemma":0.002547068,"teacher_disagreement_score":0.009169181,"about_ca_system_score_codex":0.000783173,"about_ca_system_score_gemma":0.0016788146,"threshold_uncertainty_score":0.048491836},"labels":[],"label_agreement":null},{"id":"W1767851099","doi":"10.1109/picmet.1991.183642","title":"Engineer participation in scheduling and budgeting: the effect on project performance","year":2002,"lang":"en","type":"article","venue":"Technology Management : the New International Language","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Boise Cascade (Canada)","funders":"","keywords":"Schedule; Scheduling (production processes); Project management; Project manager; Operations research; Engineering management; Computer science; Exploratory research; Project planning; Operations management; Engineering; Management; Economics; Sociology","score_opus":0.028975191472831667,"score_gpt":0.3388567123491113,"score_spread":0.3098815208762796,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1767851099","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95481247,0.0022011497,0.0031169574,0.0022080499,0.00013383589,0.00013173104,0.0012560476,0.00020984116,0.03592988],"genre_scores_gemma":[0.99068403,0.0009033257,0.0010355455,0.00007418648,0.000074407544,0.00007721732,0.00076440704,0.00005997031,0.006326955],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99322706,0.0042906767,0.00030049312,0.00028801544,0.0014281688,0.0004655647],"domain_scores_gemma":[0.83770317,0.132787,0.012416423,0.0019212591,0.0082695475,0.0069025536],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0070004333,0.00031915886,0.00038101265,0.00081001443,0.0005197506,0.0016411297,0.00057335646,0.00030968737,0.014414952],"category_scores_gemma":[0.045860495,0.00017664068,0.0004061921,0.0014545413,0.00036149597,0.000824853,0.0011273753,0.0004959891,0.0021030086],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022957053,0.0011054123,0.60455525,0.0008281868,0.0002371813,0.00027651165,0.0016986567,0.019758057,0.0016875969,0.0020085578,0.025049584,0.34049922],"study_design_scores_gemma":[0.00009062025,0.0030004226,0.96500653,0.00028133427,0.00015981494,0.00020591199,0.003906765,0.0069948714,0.0028192045,0.0014407262,0.01603518,0.000058503523],"about_ca_topic_score_codex":0.0030556791,"about_ca_topic_score_gemma":0.0034955698,"teacher_disagreement_score":0.014414952,"about_ca_system_score_codex":0.00092797226,"about_ca_system_score_gemma":0.0013515507,"threshold_uncertainty_score":0.04822284},"labels":[],"label_agreement":null},{"id":"W1769981486","doi":"10.5130/opm.v2i1.4272","title":"Complexity in the Context of Information Systems Project Management","year":2015,"lang":"en","type":"article","venue":"Organisational Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Oxford Instruments (Canada); Toronto Metropolitan University","funders":"","keywords":"Complexity management; Project management; Project management triangle; Context (archaeology); Extreme project management; Information system; Key (lock); Project charter","score_opus":0.20740744644323098,"score_gpt":0.37173781175521753,"score_spread":0.16433036531198655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1769981486","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14417528,0.054812912,0.44476345,0.082410075,0.0015801529,0.00078917283,0.00024969707,0.00018422714,0.2710351],"genre_scores_gemma":[0.90412694,0.016636828,0.07087658,0.0012362279,0.0013954204,0.0005625907,0.00010698605,0.00006369813,0.004994777],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97055256,0.019901484,0.001805038,0.0011012875,0.005244683,0.0013950752],"domain_scores_gemma":[0.9510059,0.037496347,0.004279787,0.0015128739,0.0035673415,0.0021376996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010771466,0.00082653837,0.0009710014,0.00680846,0.0065701166,0.015191767,0.0012448279,0.0029977032,0.0019878952],"category_scores_gemma":[0.033695206,0.0006838611,0.00062774785,0.0074199364,0.02055848,0.0147947045,0.0062169544,0.004310095,0.00021575762],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001547097,0.000033090306,0.0017337196,0.00035694885,0.000024971774,0.00037823216,0.0076526008,0.0071879975,0.00016898416,0.95954204,0.0021435332,0.020762442],"study_design_scores_gemma":[0.000012359651,0.00006160278,0.0023823215,0.00063725386,0.000018555289,0.00038456972,0.012179916,0.012194438,0.00029360637,0.9151362,0.056631815,0.00006730142],"about_ca_topic_score_codex":0.0048467848,"about_ca_topic_score_gemma":0.0037436734,"teacher_disagreement_score":0.015191767,"about_ca_system_score_codex":0.00922146,"about_ca_system_score_gemma":0.0075117224,"threshold_uncertainty_score":0.06690669},"labels":[],"label_agreement":null},{"id":"W1796456223","doi":"10.19255/116","title":"Discussions and Lessons Learned from three iterative and longitudinal studies aiming to optimize the identification and analysis process for stakeholders within a project context","year":2015,"lang":"en","type":"article","venue":"Journal of Modern Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Identification (biology); Process management; Process (computing); Context (archaeology); Project management; Stakeholder; Field (mathematics); Management science; Work (physics); Computer science; Knowledge management; Engineering; Political science; Systems engineering","score_opus":0.5756080741028576,"score_gpt":0.47937758580181267,"score_spread":0.09623048830104497,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1796456223","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66936135,0.0060686083,0.14059232,0.1553863,0.0013387448,0.0030037693,0.00075150543,0.00057600415,0.02292138],"genre_scores_gemma":[0.87391883,0.0056930627,0.09562123,0.011635859,0.00044261402,0.0035869435,0.00050850003,0.00032763043,0.008265282],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.84826314,0.12554365,0.005853687,0.005526553,0.010208252,0.004604756],"domain_scores_gemma":[0.57382226,0.34819302,0.009779713,0.013490742,0.047131907,0.007582309],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.1934493,0.0016931671,0.0011556327,0.0036916586,0.013610141,0.012807401,0.006077502,0.0065013426,0.0024789823],"category_scores_gemma":[0.24375458,0.0012027726,0.0013443866,0.0034625824,0.008939324,0.013122172,0.010838087,0.0075213797,0.0010039954],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039404392,0.000821754,0.018606506,0.0010667837,0.000086577136,0.0022976764,0.82989156,0.0009735986,0.0039752,0.016325617,0.0076229963,0.1179376],"study_design_scores_gemma":[0.00008321894,0.00091358257,0.017490765,0.0033706098,0.00019845572,0.0015493947,0.82897043,0.0026169338,0.010198891,0.019117557,0.11519153,0.00029866502],"about_ca_topic_score_codex":0.008408206,"about_ca_topic_score_gemma":0.014814157,"teacher_disagreement_score":0.1934493,"about_ca_system_score_codex":0.011321223,"about_ca_system_score_gemma":0.012522074,"threshold_uncertainty_score":0.9946206},"labels":[],"label_agreement":null},{"id":"W17986598","doi":"10.1007/978-1-4615-4505-7_18","title":"Business in the Future and the Nature of Projects — Research Issues","year":2000,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Project management; Project management triangle; Prerogative; Project charter; Process (computing); Knowledge management; Project planning; Project stakeholder; Project manager; Process management; Extreme project management; Set (abstract data type); Context (archaeology); Business; Engineering; OPM3; Computer science; Political science","score_opus":0.11675091826380389,"score_gpt":0.41415698798128936,"score_spread":0.29740606971748546,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W17986598","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017377986,0.2601534,0.016002078,0.16843076,0.0021565412,0.000039829105,0.00014980359,0.000045583278,0.53564405],"genre_scores_gemma":[0.46212125,0.380911,0.011267133,0.009370673,0.005541941,0.00019439259,0.00021355787,0.00011892777,0.13026108],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99701786,0.0015378975,0.0000700579,0.00017091441,0.00090633775,0.0002969448],"domain_scores_gemma":[0.9934853,0.004797123,0.000281682,0.00020749158,0.0005915899,0.00063692615],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004873634,0.00047558406,0.00077670027,0.0017167528,0.0021755188,0.017440287,0.0017311637,0.00397858,0.007854514],"category_scores_gemma":[0.00807567,0.0005352402,0.00030043814,0.005934267,0.015907668,0.01734747,0.0019499061,0.0036749141,0.0011508156],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000794657,0.000042015596,0.0003279321,0.000097459335,0.0000036969473,0.00002952819,0.00068961125,0.0006616572,0.00005859537,0.95488507,0.015304378,0.027892202],"study_design_scores_gemma":[0.0000035120295,0.000016527049,0.0014840496,0.00047082215,0.0000024782453,0.00011388166,0.0043998016,0.0014541079,0.00006128615,0.782672,0.20930949,0.000011979081],"about_ca_topic_score_codex":0.006571938,"about_ca_topic_score_gemma":0.009434133,"teacher_disagreement_score":0.017440287,"about_ca_system_score_codex":0.0051339334,"about_ca_system_score_gemma":0.0057832208,"threshold_uncertainty_score":0.037249446},"labels":[],"label_agreement":null},{"id":"W1802030535","doi":"10.3963/jmpm.v1i1.8","title":"“STAKEPARTNER MANAGEMENT\" IN PROJECTS. A turn-of-the-century TURNAROUND AT ALCAN","year":2013,"lang":"en","type":"article","venue":"Le dépôt institutionnel (Université du Québec à Trois-Rivières)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Chicoutimi; Université du Québec à Trois-Rivières","funders":"","keywords":"General partnership; Project management; Stakeholder; Project stakeholder; Business; Stakeholder management; Multinational corporation; Project portfolio management; Process management; Engineering; Project charter; Operations management; Management; Economics; Finance","score_opus":0.0304788761603736,"score_gpt":0.24245785313517754,"score_spread":0.21197897697480395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1802030535","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5629142,0.003531301,0.052395284,0.045723587,0.0003841696,0.00072181405,0.00007285358,0.0003598754,0.3338969],"genre_scores_gemma":[0.9433899,0.0005771719,0.0065347073,0.0008339796,0.000039453982,0.000088573746,0.000025662912,0.00004507402,0.048465494],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99248934,0.0033921688,0.00013761959,0.0007171202,0.0020940013,0.0011697073],"domain_scores_gemma":[0.9952426,0.0010335889,0.00046525695,0.00034145472,0.0009712169,0.001945822],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009055568,0.0004618757,0.00015186539,0.0012752551,0.009626803,0.010002634,0.0013633223,0.0017022679,0.006090483],"category_scores_gemma":[0.008437493,0.00027136487,0.00019751149,0.0008873068,0.007110154,0.004166713,0.006782884,0.0021260898,0.0006502403],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002074368,0.00052243844,0.020867037,0.00021906049,0.000031648196,0.0020369445,0.05628437,0.0039851973,0.009156743,0.46263286,0.02844807,0.41560817],"study_design_scores_gemma":[0.00006349149,0.00058504386,0.04909726,0.00045239629,0.000027908096,0.0012114872,0.09417174,0.009241901,0.005796814,0.10584268,0.73334706,0.00016222679],"about_ca_topic_score_codex":0.0635242,"about_ca_topic_score_gemma":0.1817166,"teacher_disagreement_score":0.0635242,"about_ca_system_score_codex":0.025432205,"about_ca_system_score_gemma":0.01904894,"threshold_uncertainty_score":0.18452442},"labels":[],"label_agreement":null},{"id":"W18093737","doi":"10.1016/j.pain.2007.10.032","title":"Industrialization for sustainable construction","year":2010,"lang":"en","type":"article","venue":"Pain","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Incentive; Sustainability; Business; Industrialisation; Sustainable development; Quality (philosophy); Industrial organization; Environmental economics; Engineering; Economics; Political science; Market economy","score_opus":0.06968522970915694,"score_gpt":0.3628461038477105,"score_spread":0.2931608741385535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W18093737","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0057108314,0.0040901653,0.0014168454,0.007858309,0.0013075983,0.000075109216,0.001094466,0.00032014112,0.9781266],"genre_scores_gemma":[0.041849628,0.004082478,0.0023066134,0.0013236478,0.00018753133,0.00006685883,0.0013296264,0.00012278167,0.94873095],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99930465,0.000064640895,0.00002429899,0.00009239843,0.00033616225,0.00017782226],"domain_scores_gemma":[0.9996872,0.000015556177,0.000021240723,0.00005331857,0.000126879,0.00009586001],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055193,0.00068459794,0.00025723173,0.0009970835,0.0025774841,0.003278042,0.0006004173,0.0010179185,0.23388423],"category_scores_gemma":[0.00082539,0.00013907252,0.00042036138,0.0014066637,0.0008490692,0.0011388129,0.0032180622,0.0015367476,0.057351228],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007231221,0.000113357055,0.0052792574,0.00040490055,0.000020532623,0.0004107312,0.0011113331,0.00045859243,0.0020554531,0.13636738,0.38465485,0.4690513],"study_design_scores_gemma":[0.0000021413994,0.000013788997,0.0031285435,0.00006772796,0.0000018576645,0.000066516484,0.00021291284,0.000052985815,0.0001147579,0.0021824483,0.99415153,0.0000046338246],"about_ca_topic_score_codex":0.036844574,"about_ca_topic_score_gemma":0.08930658,"teacher_disagreement_score":0.23388423,"about_ca_system_score_codex":0.0025765626,"about_ca_system_score_gemma":0.006356681,"threshold_uncertainty_score":0.7824207},"labels":[],"label_agreement":null},{"id":"W1816448624","doi":"10.3963/jmpm.v1i1.16","title":"News from Academy","year":2013,"lang":"en","type":"article","venue":"Journal of Modern Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Reading (process); Library science; Management; Political science; Operations research; Computer science; Engineering; Economics; Law","score_opus":0.11367542413429561,"score_gpt":0.3744595933706898,"score_spread":0.2607841692363942,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1816448624","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008906873,0.012964977,0.0004725181,0.3068096,0.54045546,0.000030172781,0.00062889524,0.00047107536,0.13727668],"genre_scores_gemma":[0.0135927545,0.016177738,0.00082444097,0.28787437,0.15966594,0.00007359215,0.0009188449,0.00052756025,0.5203448],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99718297,0.0003139069,0.00022764003,0.00029402165,0.001570821,0.00041068275],"domain_scores_gemma":[0.9917972,0.001822025,0.0005135514,0.00052553194,0.003354443,0.0019871725],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00257738,0.00082445936,0.00060657907,0.0015320661,0.0033463754,0.009551759,0.0010313296,0.0062957555,0.07402878],"category_scores_gemma":[0.017725553,0.0004246807,0.00079010014,0.0017039526,0.0011777079,0.0049690516,0.0019861506,0.009992486,0.048973333],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020232126,0.00000823703,0.000083021834,0.000042033673,0.0000022159832,0.000059495367,0.000039684386,0.0000077778805,0.000056504425,0.0009250981,0.98825,0.010505663],"study_design_scores_gemma":[0.0000040257996,0.000010309092,0.00026362817,0.00005978347,0.0000023508003,0.00005240355,0.00012027194,0.000012672446,0.000092720904,0.0003391279,0.999037,0.0000056276613],"about_ca_topic_score_codex":0.0035143278,"about_ca_topic_score_gemma":0.008868555,"teacher_disagreement_score":0.07402878,"about_ca_system_score_codex":0.0019324044,"about_ca_system_score_gemma":0.0039000155,"threshold_uncertainty_score":0.24765098},"labels":[],"label_agreement":null},{"id":"W1831369538","doi":"10.1111/j.1467-9310.2008.00531.x","title":"Dimensions of uncertainty and their moderating effect on new product development project performance","year":2008,"lang":"en","type":"article","venue":"R and D Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":75,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Université du Québec à Montréal; HEC Montréal","funders":"","keywords":"Moderation; Dimension (graph theory); Reliability (semiconductor); New product development; Product (mathematics); Differential (mechanical device); Measure (data warehouse); Computer science; Econometrics; Knowledge management; Mathematics; Business; Marketing; Engineering; Data mining; Power (physics)","score_opus":0.07663602330854923,"score_gpt":0.31392896659666625,"score_spread":0.237292943288117,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1831369538","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.986204,0.00046518003,0.009053438,0.00021296172,0.000020074658,0.000080379454,0.000112166876,0.00002663587,0.0038250347],"genre_scores_gemma":[0.99731547,0.000122154,0.0022069938,0.000017915818,0.000013127808,0.00007767143,0.00004568115,0.000007911169,0.00019304627],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9675185,0.02219106,0.0015947786,0.0018176045,0.005416474,0.0014615724],"domain_scores_gemma":[0.6841046,0.28318557,0.017754985,0.0064711305,0.0044783684,0.0040052305],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017468745,0.0009453528,0.0008081922,0.0013859075,0.00064932375,0.002956518,0.0005282799,0.00083948835,0.002306931],"category_scores_gemma":[0.09487706,0.0003832854,0.0008219598,0.0011556492,0.0013928019,0.0016203483,0.0039812163,0.0016335197,0.00017573117],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001848683,0.00076517847,0.89416134,0.00038828887,0.001395865,0.0002269552,0.0055301487,0.00798278,0.0042125033,0.00804531,0.00020619232,0.0752367],"study_design_scores_gemma":[0.000062960506,0.0018142972,0.9621341,0.00021504697,0.0008570787,0.0002149504,0.0033404038,0.012190801,0.006884555,0.00970361,0.0024461672,0.00013594635],"about_ca_topic_score_codex":0.0009241795,"about_ca_topic_score_gemma":0.0008068948,"teacher_disagreement_score":0.017468745,"about_ca_system_score_codex":0.00084879826,"about_ca_system_score_gemma":0.0016628394,"threshold_uncertainty_score":0.092384696},"labels":[],"label_agreement":null},{"id":"W1835481596","doi":"10.1139/l11-006","title":"Delay analysis considering production rate","year":2011,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Nonlinear system; Production (economics); Computer science; Schedule; Production rate; Scheduling (production processes); Productivity; Operations research; Industrial engineering; Mathematical optimization; Risk analysis (engineering); Engineering; Mathematics; Economics","score_opus":0.07036704269185405,"score_gpt":0.2635527125172984,"score_spread":0.19318566982544433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1835481596","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019430548,0.0007663569,0.97041893,0.00018038711,0.00008514622,0.00006791822,0.0001301502,0.00014182898,0.008778712],"genre_scores_gemma":[0.8481812,0.0027181036,0.13397597,0.00006683391,0.00018375689,0.00016339686,0.00026918965,0.00021317229,0.014228384],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983552,0.00027797592,0.00010226923,0.00031662124,0.00070481026,0.00024308928],"domain_scores_gemma":[0.9947712,0.003224366,0.0005814956,0.00028159586,0.001035713,0.00010559019],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018701152,0.0013412073,0.0007195803,0.0026281967,0.0005083789,0.0017717412,0.0012907555,0.0007360693,0.005312613],"category_scores_gemma":[0.008435817,0.0004171219,0.0013653492,0.0018293661,0.0007938058,0.0028630078,0.00096261647,0.0012275465,0.00063592265],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016179135,0.000057001605,0.0035372504,0.00037002072,0.000063855456,0.00034354624,0.0003251495,0.7952764,0.010775794,0.115949355,0.0011053438,0.07203446],"study_design_scores_gemma":[0.000009108721,0.000077799756,0.0009861724,0.00003193697,0.00005420127,0.00016233894,0.0001139463,0.95540065,0.004853479,0.032565698,0.005701919,0.000042681397],"about_ca_topic_score_codex":0.0063549196,"about_ca_topic_score_gemma":0.0022614873,"teacher_disagreement_score":0.0063549196,"about_ca_system_score_codex":0.002113166,"about_ca_system_score_gemma":0.0014887721,"threshold_uncertainty_score":0.017772496},"labels":[],"label_agreement":null},{"id":"W1857112074","doi":"10.3963/jmpm.v2i3.96","title":"The Critical success factors for End of Life aircraft Treatment projects","year":2015,"lang":"en","type":"article","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Université Laval","funders":"","keywords":"Critical success factor; Aviation; Process management; Business; Project management; Key (lock); Investment (military); Engineering; Risk analysis (engineering); Operations management; Systems engineering; Computer science","score_opus":0.07966804440868946,"score_gpt":0.34245645248997914,"score_spread":0.26278840808128967,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1857112074","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9806152,0.00036095682,0.0033013688,0.0003610646,0.000008793391,0.0002576146,0.000116699164,0.000023162815,0.014955204],"genre_scores_gemma":[0.9984861,0.000108726876,0.00080207264,0.000008013206,0.000004144727,0.000064435444,0.00005103776,0.0000049017303,0.00047059573],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99337196,0.0018022291,0.000648409,0.0003044403,0.0025433737,0.0013295319],"domain_scores_gemma":[0.8813958,0.07265155,0.02209676,0.0013217721,0.013490826,0.009043296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005580489,0.00068044534,0.000403246,0.0051627965,0.0013269787,0.0035167183,0.00046204013,0.0009659836,0.006080098],"category_scores_gemma":[0.043930423,0.000304178,0.00057341874,0.0030067074,0.0014556638,0.0015008457,0.0014862679,0.0010048313,0.0005800339],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007186504,0.0009900668,0.88423395,0.0006243005,0.00020931858,0.0015263357,0.0049354336,0.009521275,0.0035930898,0.012906743,0.0016894593,0.079051286],"study_design_scores_gemma":[0.00003689449,0.0011284231,0.9550595,0.00032789566,0.00017626424,0.00054411334,0.018236535,0.011251278,0.0031569754,0.0056244186,0.0043566325,0.00010094808],"about_ca_topic_score_codex":0.0047530225,"about_ca_topic_score_gemma":0.0058215437,"teacher_disagreement_score":0.006080098,"about_ca_system_score_codex":0.0030120255,"about_ca_system_score_gemma":0.00439021,"threshold_uncertainty_score":0.029512763},"labels":[],"label_agreement":null},{"id":"W1887630193","doi":"10.3968/j.css.1923669720130902.5124","title":"Manufacture-learning-research Cooperation of the Government's Role and the Position in China","year":2013,"lang":"en","type":"article","venue":"Canadian social science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Promotion (chess); China; Position (finance); Standardization; Competition (biology); Public relations; Order (exchange); Business; Political science; Politics","score_opus":0.023268101197036886,"score_gpt":0.31948689281861,"score_spread":0.2962187916215731,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1887630193","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88068175,0.0020086414,0.00077236316,0.014600341,0.00010720996,0.00008918815,0.00016104286,0.000039148978,0.10154037],"genre_scores_gemma":[0.9852787,0.0005103329,0.00024960484,0.00024116902,0.000011191964,0.000023282273,0.00003977159,0.0000039860574,0.013641947],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9965365,0.00068441214,0.00014299835,0.00027217963,0.00087423524,0.0014896082],"domain_scores_gemma":[0.99671835,0.00043239904,0.00035741535,0.00013171756,0.00072610914,0.001633977],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039972626,0.00023477158,0.00020219748,0.0016309276,0.004286209,0.0035151527,0.0007586357,0.00075537857,0.003975014],"category_scores_gemma":[0.0026131521,0.00015889222,0.00021037777,0.0026059104,0.0030336876,0.0011693521,0.002149656,0.0008180914,0.00020806235],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003086379,0.0003600965,0.36172792,0.0003464438,0.000071678616,0.0011610507,0.025760297,0.0039724642,0.0031702747,0.40598467,0.024803316,0.17233321],"study_design_scores_gemma":[0.000077760575,0.00024176385,0.72819364,0.00032616823,0.00007701995,0.00026201032,0.029430827,0.0072191954,0.0019211407,0.013791893,0.21833727,0.000121326295],"about_ca_topic_score_codex":0.22494043,"about_ca_topic_score_gemma":0.21945813,"teacher_disagreement_score":0.22494043,"about_ca_system_score_codex":0.019278191,"about_ca_system_score_gemma":0.06692581,"threshold_uncertainty_score":0.44726223},"labels":[],"label_agreement":null},{"id":"W1891577109","doi":"10.1139/l2012-030","title":"Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement<sup>1</sup>This paper is one of a selection of papers in this Special Issue on Construction Engineering and Management.","year":2012,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Calgary; École de Technologie Supérieure; University of Alberta; University of New Brunswick; University of Waterloo","funders":"","keywords":"Benchmarking; Rework; Productivity; Construction management; Quality (philosophy); Quality management; Engineering management; Performance indicator; Project management; Process management; Operations management; Engineering; Business; Computer science; Systems engineering; Management system; Civil engineering; Marketing; Economics","score_opus":0.0173238419775842,"score_gpt":0.25635666410561003,"score_spread":0.23903282212802585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1891577109","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10773739,0.0011726501,0.7059285,0.02606098,0.001473194,0.055304542,0.0037795426,0.014109308,0.08443382],"genre_scores_gemma":[0.14010288,0.00064039143,0.8253576,0.00088441634,0.00016537095,0.014533386,0.005567456,0.0007998922,0.01194862],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9298206,0.030487247,0.0061764293,0.0030097137,0.026861355,0.0036447677],"domain_scores_gemma":[0.851363,0.0158469,0.010330454,0.01112193,0.10039462,0.010943105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.10132769,0.001241111,0.0010015472,0.007543321,0.0040531326,0.0062638475,0.0047124787,0.0013690158,0.002926711],"category_scores_gemma":[0.087061405,0.0008559015,0.0007605597,0.0064244247,0.0012336769,0.0052137016,0.004632138,0.0030024627,0.001364731],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013314444,0.0016797022,0.01993511,0.00053484295,0.00005703829,0.00012268459,0.0036672275,0.007332843,0.003590026,0.0080514755,0.04453323,0.9103628],"study_design_scores_gemma":[0.0005211296,0.008524562,0.24629782,0.0036617178,0.00025418156,0.00048181714,0.01986676,0.087441325,0.040548455,0.014249674,0.577322,0.0008305578],"about_ca_topic_score_codex":0.06322136,"about_ca_topic_score_gemma":0.065119766,"teacher_disagreement_score":0.10132769,"about_ca_system_score_codex":0.01724273,"about_ca_system_score_gemma":0.07690948,"threshold_uncertainty_score":0.5358784},"labels":[],"label_agreement":null},{"id":"W1895902580","doi":"","title":"Communications for the Ones Who Never Spoke : Running the MIM Marathon in the Peruvian Highlands","year":2011,"lang":"en","type":"article","venue":"World Bank Other Operational Studies","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Accountability; Population; Business; Latin Americans; Norwegian; Corporation; Public relations; Political science; Economic growth; Public administration; Finance; Economics; Sociology; Law","score_opus":0.4541395188367867,"score_gpt":0.4425774202815095,"score_spread":0.011562098555277234,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1895902580","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6725795,0.0023557534,0.0014411064,0.27635688,0.00040852185,0.00022302559,0.00011221931,0.0001269744,0.046396],"genre_scores_gemma":[0.9656753,0.002423459,0.001556468,0.012636316,0.00018227893,0.00026258585,0.000096171214,0.00006401657,0.017103465],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9951715,0.0035252005,0.000054633743,0.00012891536,0.0002610246,0.00085871347],"domain_scores_gemma":[0.99136263,0.003789978,0.00075336715,0.00026428216,0.00088603457,0.002943705],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0053218366,0.00032427505,0.00019227057,0.000818647,0.013516881,0.005092749,0.001223827,0.0031205958,0.0065269135],"category_scores_gemma":[0.016979212,0.0003441579,0.00017589194,0.0011100443,0.0044570863,0.005429291,0.007031661,0.0037595262,0.00091023336],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018727267,0.00072108494,0.028004805,0.0004921426,0.00003841587,0.0047606565,0.67050576,0.0003136692,0.0009808129,0.015551004,0.11931725,0.15912718],"study_design_scores_gemma":[0.000039042592,0.0004426838,0.025137348,0.00035840314,0.000020622718,0.00044672893,0.8066095,0.00022840127,0.00042200618,0.0026525832,0.16359474,0.000048006263],"about_ca_topic_score_codex":0.024745584,"about_ca_topic_score_gemma":0.054629732,"teacher_disagreement_score":0.024745584,"about_ca_system_score_codex":0.004031666,"about_ca_system_score_gemma":0.007841798,"threshold_uncertainty_score":0.049203098},"labels":[],"label_agreement":null},{"id":"W1896555392","doi":"10.1139/l11-038","title":"Current status of factors leading to team performance of on-site construction professionals in Alberta building construction projects","year":2011,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Calgary; SNC-Lavalin (Canada); University of British Columbia, Okanagan Campus","funders":"","keywords":"Team building; Certification; Work (physics); Construction industry; Building construction; Engineering; Construction management; Team composition; Business; Operations management; Marketing; Public relations; Engineering management; Knowledge management; Management; Civil engineering; Political science; Construction engineering","score_opus":0.05695419725376718,"score_gpt":0.29997796126985377,"score_spread":0.24302376401608658,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1896555392","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9990716,0.00012787254,0.000027327185,0.000048264686,0.0000013832305,0.0000039215774,0.000038144808,0.000001828736,0.00067959784],"genre_scores_gemma":[0.9993892,0.00012456196,0.00006527156,0.000007225823,0.0000014272385,0.000003393539,0.00006985421,6.54298e-7,0.00033848285],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99854976,0.00024757322,0.00007964526,0.00011896071,0.000539431,0.0004646163],"domain_scores_gemma":[0.9956339,0.00049625785,0.0010452333,0.0000865019,0.0015654459,0.0011726583],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013633209,0.00021448938,0.00018573615,0.001362788,0.0012353054,0.0010700246,0.00063173514,0.00032641992,0.0011735221],"category_scores_gemma":[0.0035290532,0.00024210561,0.00016453494,0.0011693093,0.00078607403,0.000253679,0.00063595356,0.00028383735,0.00021775442],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005062129,0.000074257485,0.98156196,0.000028060866,0.000012097371,0.00008239465,0.004087951,0.00013507239,0.00046064143,0.000032356096,0.00020782734,0.013266783],"study_design_scores_gemma":[6.7382825e-7,0.00002253631,0.99584913,0.000009790357,0.0000024360832,0.000017282662,0.0038426295,0.00006080835,0.00003652207,0.000007820895,0.00014723126,0.0000030295319],"about_ca_topic_score_codex":0.6411602,"about_ca_topic_score_gemma":0.7893324,"teacher_disagreement_score":0.3588398,"about_ca_system_score_codex":0.0046360577,"about_ca_system_score_gemma":0.0056341374,"threshold_uncertainty_score":0.7219062},"labels":[],"label_agreement":null},{"id":"W1915793052","doi":"10.3963/jmpm.v1i2.18","title":"Towards an Iterative and Longitudinal Methodology for Analyzing Stakeholders within a Project Context","year":2013,"lang":"en","type":"article","venue":"Journal of Modern Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Context (archaeology); Process management; Computer science; Key (lock); Project management; Identification (biology); Field (mathematics); Project stakeholder; Knowledge management; Stakeholder; Management science; Project management triangle; OPM3; Business; Engineering; Systems engineering; Political science; Public relations","score_opus":0.42772149394261577,"score_gpt":0.4433433863406496,"score_spread":0.015621892398033854,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1915793052","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06620124,0.00032017095,0.9222288,0.001040332,0.00004672379,0.0029605043,0.00025735414,0.00042595092,0.0065189386],"genre_scores_gemma":[0.15348408,0.00017298888,0.84000605,0.00013300174,0.000019051757,0.0046178545,0.000333635,0.000049189068,0.0011840888],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9463295,0.043657232,0.0018380666,0.0027623149,0.004548686,0.000864312],"domain_scores_gemma":[0.92028314,0.04580346,0.007910686,0.0065401914,0.017282424,0.0021800534],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.056377575,0.0013378991,0.00075521343,0.009639736,0.0034050825,0.00714539,0.002697831,0.0017636418,0.00215223],"category_scores_gemma":[0.07059704,0.0010025272,0.0010776309,0.005824351,0.0042776885,0.010559727,0.00746485,0.0022361437,0.0008442916],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039733518,0.0013357298,0.14737158,0.0012158862,0.00020633933,0.00070308783,0.20756648,0.0041656,0.014401034,0.12051328,0.0030166414,0.49910706],"study_design_scores_gemma":[0.0002975284,0.0032782059,0.11626946,0.0038638383,0.00046010743,0.0020425394,0.27692094,0.14788154,0.029065438,0.32972604,0.089439645,0.0007547528],"about_ca_topic_score_codex":0.0053006276,"about_ca_topic_score_gemma":0.00995325,"teacher_disagreement_score":0.056377575,"about_ca_system_score_codex":0.00404198,"about_ca_system_score_gemma":0.010329328,"threshold_uncertainty_score":0.29815668},"labels":[],"label_agreement":null},{"id":"W1930087483","doi":"","title":"Information technology and collaboration in the canadian construction industry","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Respondent; Context (archaeology); Knowledge management; Business; Information exchange; Product (mathematics); Information technology; Information transfer; Order (exchange); Computer science; Telecommunications","score_opus":0.015969805132066393,"score_gpt":0.2709117195613791,"score_spread":0.2549419144293127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1930087483","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8631719,0.0041683693,0.0006090941,0.009454175,0.00007363817,0.00013387002,0.0004066746,0.000030873583,0.121951334],"genre_scores_gemma":[0.9874979,0.0019140816,0.0005063417,0.0002543112,0.000009221215,0.000030162622,0.000104125225,0.000008166397,0.009675674],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9943768,0.0011839789,0.00024077744,0.0004103676,0.0021972256,0.0015909326],"domain_scores_gemma":[0.99093086,0.0019160046,0.0008809327,0.00016488058,0.0032512692,0.0028561293],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034673642,0.00026583511,0.00037145714,0.0035909805,0.024985803,0.0055909194,0.001072858,0.0010416171,0.0057605496],"category_scores_gemma":[0.00875174,0.00033357472,0.00031043674,0.010552307,0.0038524712,0.0017540124,0.003787877,0.0011007063,0.00031803138],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029302,0.0005139509,0.27408427,0.0008309845,0.00006963695,0.0028601992,0.41718298,0.002729255,0.0011614918,0.094478674,0.024603913,0.1811916],"study_design_scores_gemma":[0.00004655409,0.0001471337,0.42604816,0.00055144634,0.000037325306,0.00041426113,0.42143685,0.0022719647,0.0004111991,0.0031789003,0.14530817,0.0001480952],"about_ca_topic_score_codex":0.9931491,"about_ca_topic_score_gemma":0.99560237,"teacher_disagreement_score":0.11202027,"about_ca_system_score_codex":0.11202027,"about_ca_system_score_gemma":0.19239026,"threshold_uncertainty_score":0.81276774},"labels":[],"label_agreement":null},{"id":"W1932502402","doi":"10.3963/jmpm.v3i1.117","title":"Exploring Collective Political Competence in Socially Complex Projects","year":2015,"lang":"en","type":"article","venue":"Journal of Modern Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Interdependence; Competence (human resources); Politics; Stakeholder; Competence-based management; Knowledge management; Stakeholder theory; Public relations; Sociology; Business; Political science; Psychology; Marketing; Social psychology; Computer science; Strategic planning","score_opus":0.6151112019978716,"score_gpt":0.4244388660113797,"score_spread":0.19067233598649191,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1932502402","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9576007,0.00007914808,0.00972089,0.00048122945,0.000006340321,0.00008074416,0.000007152298,0.0000049281552,0.032018907],"genre_scores_gemma":[0.99860966,0.00003402445,0.0009470252,0.000012141155,0.0000020586835,0.000033859786,0.0000040599575,0.0000015131794,0.00035569677],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9910658,0.007022027,0.00016169407,0.00032531106,0.0008417633,0.0005833074],"domain_scores_gemma":[0.98679173,0.009110569,0.0018831182,0.0006052105,0.00058166677,0.0010276672],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007929576,0.00025775662,0.00030053753,0.0015776256,0.0024889319,0.004989667,0.00050421385,0.00090629846,0.002106452],"category_scores_gemma":[0.01735273,0.00021997979,0.0003224239,0.0008360238,0.008363308,0.0038842736,0.007779245,0.0011075446,0.00011645559],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021264171,0.0005402844,0.07985981,0.0005230891,0.00008444114,0.0020113897,0.58915704,0.006216308,0.006517487,0.24925251,0.00065463065,0.06497034],"study_design_scores_gemma":[0.00004924411,0.0004049617,0.098786205,0.00030192352,0.00003582141,0.0008504502,0.7440804,0.010232866,0.0018110543,0.11926523,0.024115037,0.00006687816],"about_ca_topic_score_codex":0.0012986801,"about_ca_topic_score_gemma":0.0017264509,"teacher_disagreement_score":0.007929576,"about_ca_system_score_codex":0.0019672287,"about_ca_system_score_gemma":0.0018177546,"threshold_uncertainty_score":0.0419361},"labels":[],"label_agreement":null},{"id":"W1936446011","doi":"10.1139/cjce-2014-0031","title":"Identification and comparative analysis of key parameters influencing construction labour productivity in building and industrial projects","year":2014,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Canadian Natural Resources","funders":"","keywords":"Productivity; Context (archaeology); Identification (biology); Key (lock); Business; Engineering; Computer science; Economics; Economic growth; Geography","score_opus":0.06481635670394066,"score_gpt":0.2867549828379044,"score_spread":0.22193862613396376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1936446011","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9985688,0.000063383595,0.00054170593,0.000007903166,4.788576e-7,0.000026165317,0.00005644372,0.0000015391721,0.000733526],"genre_scores_gemma":[0.9993486,0.00006537556,0.00042109544,0.0000016948674,3.6858438e-7,0.00001995088,0.00006008062,9.164083e-7,0.000081988066],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99617404,0.0014649812,0.00027371003,0.00026629874,0.0011682378,0.00065264606],"domain_scores_gemma":[0.98730034,0.0073368,0.0018402447,0.0005344766,0.0023798312,0.0006082797],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0043857563,0.00030440313,0.0004047999,0.0023691491,0.0007672873,0.0013247038,0.0003892718,0.00028497947,0.0008786882],"category_scores_gemma":[0.01655241,0.00022059647,0.00033343385,0.0048850975,0.00092985615,0.0007225926,0.0017192871,0.00026492373,0.00009042083],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016395048,0.00006501839,0.9405167,0.00019285726,0.000061703875,0.00013156928,0.015270597,0.0009015342,0.0017361675,0.00043860823,0.00007132488,0.04044993],"study_design_scores_gemma":[0.0000013545077,0.00006438432,0.984736,0.000017241831,0.000015613865,0.000022272641,0.014178621,0.00039051645,0.00023774437,0.00006246404,0.0002667605,0.0000069744196],"about_ca_topic_score_codex":0.0990984,"about_ca_topic_score_gemma":0.18173873,"teacher_disagreement_score":0.0990984,"about_ca_system_score_codex":0.0034843017,"about_ca_system_score_gemma":0.0058449735,"threshold_uncertainty_score":0.19704312},"labels":[],"label_agreement":null},{"id":"W1963135098","doi":"10.1002/pmj.21522","title":"Project Management Office Transformations: Direct and Moderating Effects that Enhance Performance and Maturity","year":2015,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Context (archaeology); Process management; Maturity (psychological); Knowledge management; Business; Change management (ITSM); Psychology; Computer science; Marketing","score_opus":0.07723364362726311,"score_gpt":0.350425408221175,"score_spread":0.2731917645939119,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1963135098","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9955314,0.00013555179,0.0009356611,0.00014503748,0.000006870711,0.0000522109,0.00002310122,0.000023028477,0.0031471292],"genre_scores_gemma":[0.9991301,0.00004533842,0.0004990354,0.000015618634,0.0000067291603,0.00002400149,0.000016032598,0.0000072032494,0.00025606962],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9943532,0.0034113347,0.00024862913,0.0004914278,0.0009058096,0.00058967905],"domain_scores_gemma":[0.95769703,0.028288335,0.007112175,0.0018456473,0.0014900146,0.003566781],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052585797,0.00037571896,0.00031818304,0.00051096414,0.0005456679,0.0015657814,0.00038487336,0.00046168352,0.0032213924],"category_scores_gemma":[0.028930793,0.00016512636,0.00034536826,0.0004981941,0.0010700683,0.0014047608,0.0019392945,0.0009285613,0.00030261287],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0036771335,0.0060607158,0.72858346,0.00039764412,0.00043215472,0.0005032912,0.009808149,0.0011155572,0.026433378,0.0042722,0.00047903572,0.21823727],"study_design_scores_gemma":[0.00008992854,0.0041683963,0.9789154,0.000057017394,0.00019542534,0.000164754,0.0040855077,0.0008654098,0.0074081924,0.0017591872,0.002267444,0.000023378278],"about_ca_topic_score_codex":0.00046239945,"about_ca_topic_score_gemma":0.00081978017,"teacher_disagreement_score":0.0052585797,"about_ca_system_score_codex":0.00055912626,"about_ca_system_score_gemma":0.0011592949,"threshold_uncertainty_score":0.027810335},"labels":[],"label_agreement":null},{"id":"W1964916298","doi":"10.1108/13527590510606299","title":"Examining effective and ineffective transformational project leadership","year":2005,"lang":"en","type":"article","venue":"Team Performance Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Fredericton; University of New Brunswick","funders":"","keywords":"Transformational leadership; Psychology; Shared leadership; Public relations; Team effectiveness; Stakeholder; Transactional leadership; Knowledge management; Social psychology; Political science; Computer science","score_opus":0.15944065636482882,"score_gpt":0.34630488307672824,"score_spread":0.18686422671189942,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1964916298","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.996394,0.00004630556,0.0019103049,0.0000452558,0.0000032542716,0.000095607655,0.000022065911,0.000009219333,0.0014740189],"genre_scores_gemma":[0.99677616,0.000069814574,0.0024540408,0.000025807754,0.0000056307986,0.00014306043,0.000037137866,0.000004587675,0.0004838825],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9942175,0.0034882242,0.0003310485,0.0006045895,0.0010150983,0.00034344866],"domain_scores_gemma":[0.97602785,0.013170488,0.0050779325,0.0015691535,0.0033456185,0.00080895127],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0067215087,0.00033424608,0.00020059444,0.0011934339,0.0012983637,0.0009975885,0.0007843714,0.00043532983,0.0010338796],"category_scores_gemma":[0.025694458,0.00023099779,0.00013200057,0.0003695967,0.0013005493,0.0006600293,0.0017590182,0.0006166826,0.00015243323],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036003796,0.0010196294,0.5176191,0.0007652937,0.000069495334,0.0027017943,0.29174846,0.00077430106,0.039849453,0.0014823393,0.0008157744,0.14279436],"study_design_scores_gemma":[0.000035999037,0.002595073,0.6669027,0.0002556138,0.000051914507,0.0030409698,0.2959997,0.0035292727,0.016567448,0.0012898005,0.009643132,0.00008827419],"about_ca_topic_score_codex":0.00090815686,"about_ca_topic_score_gemma":0.0022785813,"teacher_disagreement_score":0.0067215087,"about_ca_system_score_codex":0.00061442744,"about_ca_system_score_gemma":0.0008274209,"threshold_uncertainty_score":0.035547197},"labels":[],"label_agreement":null},{"id":"W1965218279","doi":"10.1108/01409170710759694","title":"Intangible project management assets as determinants of competitive advantage","year":2007,"lang":"en","type":"article","venue":"Management Research News","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University; University of Calgary","funders":"","keywords":"Competitive advantage; Business; Project management triangle; Project management; Intangible asset; Knowledge management; Project portfolio management; OPM3; Asset (computer security); Originality; Program management; Resource-based view; Process management; Marketing; Computer science; Economics; Management; Finance","score_opus":0.21201137543878285,"score_gpt":0.5326546796330897,"score_spread":0.3206433041943068,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1965218279","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9811763,0.00024403814,0.0009715488,0.0004752789,0.000007723313,0.000036026537,0.00004117519,0.000005092467,0.017042913],"genre_scores_gemma":[0.9995653,0.000049187438,0.0001776891,0.0000122719875,0.0000042519187,0.000007629289,0.000014049683,9.362405e-7,0.00016857071],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99662894,0.0014740776,0.00014268125,0.00016415997,0.0010276,0.0005625738],"domain_scores_gemma":[0.96175665,0.01787928,0.008927427,0.0007477445,0.0034205047,0.007268371],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030120441,0.00033639703,0.0002741377,0.0018119989,0.00085334363,0.002983334,0.00045014368,0.00041653757,0.0054762666],"category_scores_gemma":[0.018040948,0.00011458013,0.00025387717,0.0012245505,0.0016126075,0.0016645249,0.0024803174,0.00074777496,0.0003133182],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023814946,0.0012081465,0.8942717,0.00018606216,0.00017330532,0.0006062163,0.0032928293,0.0018777712,0.0008289971,0.020378742,0.0008960873,0.076041974],"study_design_scores_gemma":[0.000042004303,0.0006250812,0.95520127,0.00016463271,0.00007390759,0.00050775724,0.014112374,0.007205009,0.0008926166,0.016500533,0.0046198964,0.00005498247],"about_ca_topic_score_codex":0.0016322279,"about_ca_topic_score_gemma":0.0020304613,"teacher_disagreement_score":0.0054762666,"about_ca_system_score_codex":0.0010235285,"about_ca_system_score_gemma":0.0014716197,"threshold_uncertainty_score":0.018319964},"labels":[],"label_agreement":null},{"id":"W1965311355","doi":"10.1016/j.jom.2007.10.006","title":"Project success and project team management: Evidence from capital projects in the process industries","year":2007,"lang":"en","type":"article","venue":"Journal of Operations Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":265,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nexen (Canada)","funders":"","keywords":"Project management triangle; Project team; Project planning; Project charter; Schedule; Project stakeholder; Process management; OPM3; Project management; Project manager; Work breakdown structure; Project sponsorship; Business; Knowledge management; Operability; Basis of estimate; Extreme project management; Project portfolio management; Computer science; Engineering; Systems engineering","score_opus":0.10706495778452635,"score_gpt":0.4032531455641699,"score_spread":0.29618818777964356,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1965311355","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9984633,0.00036795269,0.00016695839,0.00008922824,0.0000025841491,0.000014787566,0.000024087894,9.710337e-7,0.0008702382],"genre_scores_gemma":[0.9994671,0.000280928,0.000105656996,0.00001860725,0.0000037477341,0.000020040186,0.000028530994,0.0000017953791,0.000073804724],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98844284,0.007554998,0.00064555445,0.0006622589,0.002015182,0.0006791164],"domain_scores_gemma":[0.82936436,0.10504456,0.042811994,0.0054631783,0.010423601,0.0068923],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014255677,0.00027992605,0.00041997107,0.0026730925,0.0011991085,0.0023083768,0.0008878701,0.00062568113,0.0023588382],"category_scores_gemma":[0.08547184,0.0004423083,0.0003705745,0.0025369315,0.0016738542,0.0012531667,0.0030578517,0.0009740133,0.0002546699],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026413973,0.0005752895,0.9652645,0.0002050811,0.00015619419,0.00024638875,0.009804506,0.0002719488,0.00008642693,0.00057013554,0.00036973524,0.02218564],"study_design_scores_gemma":[0.000032410975,0.00046920724,0.98794913,0.00021299947,0.00005625138,0.00018193581,0.009333031,0.00047315072,0.000107830325,0.0003666229,0.00080397964,0.000013426631],"about_ca_topic_score_codex":0.0049465,"about_ca_topic_score_gemma":0.0043905643,"teacher_disagreement_score":0.014255677,"about_ca_system_score_codex":0.00071503106,"about_ca_system_score_gemma":0.0013712909,"threshold_uncertainty_score":0.07539213},"labels":[],"label_agreement":null},{"id":"W1966798081","doi":"10.1002/pmj.20117","title":"The Logical Framework Approach-Millennium","year":2009,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Canadian Nuclear Safety Commission; Canadian Space Agency; University of Ottawa","funders":"","keywords":"Project management; Project planning; Project charter; Extreme project management; Project management triangle; Logical framework; Agency (philosophy); Program management; Computer science; Process management; Engineering management; Work breakdown structure; OPM3; Management science; Engineering; Systems engineering; Sociology","score_opus":0.10341331728996855,"score_gpt":0.3864930597441056,"score_spread":0.28307974245413703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1966798081","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002882833,0.0049701533,0.81412786,0.016282376,0.0007125084,0.00043032021,0.00052902766,0.0007415344,0.15932342],"genre_scores_gemma":[0.10317976,0.004518864,0.86846316,0.0030397621,0.00038298382,0.0011831423,0.00064577634,0.0003883953,0.018198052],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.98338693,0.010766346,0.0010797657,0.0012891055,0.002871539,0.000606371],"domain_scores_gemma":[0.98978883,0.005363476,0.0006603127,0.0012396133,0.002194873,0.00075293257],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019355282,0.0009321483,0.0006722218,0.0039234757,0.0034499592,0.011389884,0.0031674511,0.0022107183,0.008514096],"category_scores_gemma":[0.014038643,0.00068721594,0.0015687429,0.0037471184,0.010652667,0.013034642,0.006531445,0.0044755316,0.0019368449],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006980584,0.000010326183,0.00011046817,0.0000973156,0.000008963078,0.000042980737,0.00072724,0.00060814485,0.000082631566,0.9691256,0.005396504,0.023782821],"study_design_scores_gemma":[0.000017451956,0.000023604549,0.00016150823,0.00039822422,0.000016870084,0.00020830672,0.0008846731,0.002880235,0.00035409039,0.6793889,0.31563556,0.000030661697],"about_ca_topic_score_codex":0.010145917,"about_ca_topic_score_gemma":0.008612978,"teacher_disagreement_score":0.019355282,"about_ca_system_score_codex":0.009640433,"about_ca_system_score_gemma":0.01782029,"threshold_uncertainty_score":0.10236174},"labels":[],"label_agreement":null},{"id":"W1967029102","doi":"10.1002/pmj.20081","title":"Development of a Project Management Model for a Government Research and Development Organization","year":2008,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Institute for Biodiagnostics","funders":"","keywords":"OPM3; Project management; Project management triangle; Project stakeholder; Project charter; Knowledge management; Extreme project management; Bridge (graph theory); Process management; Government (linguistics); Business; Program management; Project planning; Work breakdown structure; Engineering management; Engineering; Computer science; Systems engineering","score_opus":0.3362324864683914,"score_gpt":0.4242431523730115,"score_spread":0.08801066590462014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1967029102","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":"methods","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":"methods","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04428591,0.000119503035,0.90173644,0.003697106,0.00010279723,0.0014049778,0.00013019015,0.0006174508,0.047905654],"genre_scores_gemma":[0.18532042,0.00019061667,0.8042007,0.00014843626,0.000025206109,0.0016830929,0.00025714005,0.00007694166,0.008097432],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99476457,0.0026750138,0.00040727266,0.0004959697,0.0013712981,0.00028587817],"domain_scores_gemma":[0.99458015,0.0014760465,0.00065879145,0.0008764269,0.0015807748,0.00082782016],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.008013002,0.0005510405,0.00028105537,0.001471172,0.0018420395,0.005983282,0.0018216149,0.0012561626,0.0036831952],"category_scores_gemma":[0.008214983,0.00045269352,0.0007913517,0.0010983957,0.0014514654,0.005237145,0.0022076378,0.0015357088,0.0014289294],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000114885064,0.0008117465,0.012916222,0.00034033638,0.000087468485,0.00036863328,0.00854896,0.087056845,0.0037067018,0.68240833,0.009675783,0.19396405],"study_design_scores_gemma":[0.0002120382,0.00091327523,0.0047259694,0.0006412409,0.00009639785,0.0007292244,0.007821742,0.52807474,0.0032228879,0.24757363,0.2058229,0.00016599096],"about_ca_topic_score_codex":0.0034371403,"about_ca_topic_score_gemma":0.0038382919,"teacher_disagreement_score":0.991987,"about_ca_system_score_codex":0.0033187447,"about_ca_system_score_gemma":0.009026842,"threshold_uncertainty_score":0.042377293},"labels":[],"label_agreement":null},{"id":"W1969015779","doi":"10.1139/l08-133","title":"Decision-making support model for reusable construction materials in multiple project management","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Procurement; Reuse; Process (computing); Request for proposal; Materials management; Resource (disambiguation); Construction management; Decision support system; Construction engineering; Computer science; Systems engineering; Process management; Operations management; Business; Engineering; Civil engineering","score_opus":0.04734747103327051,"score_gpt":0.3048105748557589,"score_spread":0.2574631038224884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1969015779","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15579727,0.00045009446,0.8023631,0.0029310351,0.0001500091,0.0010689269,0.0018457146,0.000979568,0.034414336],"genre_scores_gemma":[0.90091336,0.0004143912,0.08637804,0.00015057788,0.000067002235,0.001279794,0.0008374274,0.000032144806,0.009927262],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99787354,0.0008125363,0.00012849401,0.00038289896,0.00032798297,0.00047457917],"domain_scores_gemma":[0.99694127,0.0019571604,0.00031469038,0.00006606606,0.00042858216,0.00029220188],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037512328,0.0015706089,0.0018882324,0.0018825649,0.0018839657,0.0047705495,0.003250402,0.003268984,0.015855448],"category_scores_gemma":[0.004555041,0.00081229035,0.001402479,0.0019601712,0.0011718057,0.002296171,0.0017574857,0.0021372573,0.0014142994],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001836124,0.00017751202,0.0010789133,0.000084306586,0.000052864383,0.000462725,0.00020114306,0.96256006,0.0004732862,0.025420427,0.0007537137,0.008551422],"study_design_scores_gemma":[0.00005834459,0.000053152235,0.00012495524,0.000010199965,0.000020020332,0.000019403502,0.000053993434,0.9947436,0.00013118984,0.004258305,0.0005153166,0.000011484261],"about_ca_topic_score_codex":0.0323225,"about_ca_topic_score_gemma":0.019088758,"teacher_disagreement_score":0.0323225,"about_ca_system_score_codex":0.005348109,"about_ca_system_score_gemma":0.005139043,"threshold_uncertainty_score":0.06426871},"labels":[],"label_agreement":null},{"id":"W1970990534","doi":"10.2118/2007-173","title":"Evaluation of SAGD Projects Using a Dynamic Economic Indicator","year":2007,"lang":"en","type":"article","venue":"Canadian International Petroleum Conference","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; Husky Energy (Canada)","funders":"","keywords":"Computer science; Petroleum engineering; Geology","score_opus":0.12831532644091737,"score_gpt":0.3842679492570823,"score_spread":0.25595262281616493,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1970990534","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96498835,0.00013317612,0.025710493,0.00006277825,0.0000095975265,0.00022883185,0.0014477135,0.00014732074,0.0072718835],"genre_scores_gemma":[0.994379,0.000045578367,0.0045497227,0.000004198802,0.0000015208764,0.000044400767,0.00044756266,0.0000057822517,0.0005222275],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976464,0.0003727729,0.00013366135,0.00013026036,0.0015858879,0.00013098687],"domain_scores_gemma":[0.99608624,0.0010535158,0.0008222748,0.00016997695,0.001685762,0.00018219525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025242236,0.000527746,0.00036151853,0.004694318,0.0002879894,0.0018875567,0.0008020672,0.0003666572,0.0014537273],"category_scores_gemma":[0.004926574,0.000208959,0.0004170213,0.0037899541,0.00067537767,0.00091001403,0.0009917567,0.00030622643,0.00018820827],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045015864,0.000279782,0.5786015,0.00027849144,0.00021083253,0.00036385682,0.00023824656,0.3206872,0.01304014,0.003574498,0.0010691583,0.08120611],"study_design_scores_gemma":[0.000019868223,0.00082500733,0.56109977,0.00006581394,0.000067498026,0.00013397737,0.00092567015,0.41434872,0.016724654,0.0015444057,0.004133657,0.00011098855],"about_ca_topic_score_codex":0.021877568,"about_ca_topic_score_gemma":0.032008983,"teacher_disagreement_score":0.021877568,"about_ca_system_score_codex":0.00467383,"about_ca_system_score_gemma":0.0014785856,"threshold_uncertainty_score":0.043500423},"labels":[],"label_agreement":null},{"id":"W1971490548","doi":"10.5539/ass.v4n7p74","title":"Analysis of Effectiveness Measures of Construction Project Success in Malaysia","year":2009,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":85,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Stakeholder; Ranking (information retrieval); Business; Process management; Government (linguistics); Project management; Questionnaire; Operations management; Computer science; Engineering; Public relations; Economics; Management; Political science; Mathematics","score_opus":0.060693591364841044,"score_gpt":0.3859322443326596,"score_spread":0.32523865296781856,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1971490548","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99013793,0.00041603073,0.002687084,0.000059567028,0.0000049303953,0.00006679224,0.000261966,0.000019159106,0.006346485],"genre_scores_gemma":[0.9985936,0.00012237753,0.0007938247,0.0000031257675,0.0000027752358,0.000041057378,0.00012156236,0.000003602605,0.00031812774],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99315804,0.0025266216,0.00081208785,0.00022854167,0.0027716237,0.00050320494],"domain_scores_gemma":[0.968513,0.015757212,0.00837993,0.00079103664,0.0054151947,0.0011435827],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00640919,0.000442283,0.00038056544,0.005599741,0.00028446803,0.0013074084,0.00033012786,0.00023355256,0.0009986707],"category_scores_gemma":[0.020109845,0.00017787331,0.00048394589,0.0032450967,0.0006247444,0.001078955,0.000880623,0.00035057525,0.00021682028],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040565117,0.00020510658,0.8875338,0.00033218742,0.0002572949,0.00018460127,0.0024166158,0.005637683,0.0012111922,0.0019873136,0.0005657716,0.09926284],"study_design_scores_gemma":[0.000007380235,0.0006611393,0.9870702,0.00011741885,0.000044107466,0.0001604292,0.0030939053,0.005671235,0.0016317089,0.0003487538,0.001162577,0.00003108016],"about_ca_topic_score_codex":0.003138608,"about_ca_topic_score_gemma":0.002677552,"teacher_disagreement_score":0.00640919,"about_ca_system_score_codex":0.0013664888,"about_ca_system_score_gemma":0.0011009108,"threshold_uncertainty_score":0.033895433},"labels":[],"label_agreement":null},{"id":"W1972540814","doi":"10.5539/ibr.v1n4p94","title":"Partnering Project Success Criteria in Malaysia","year":2009,"lang":"en","type":"article","venue":"International Business Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Procurement; Business; Risk management; Quality (philosophy); Integrated project delivery; Process management; Process (computing); Project risk management; Operations management; Risk analysis (engineering); Critical success factor; Project management; Finance; Project management triangle; Marketing; Engineering; Computer science; Economics; Management","score_opus":0.2850578355444226,"score_gpt":0.5353640933459939,"score_spread":0.2503062578015713,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1972540814","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9746995,0.00030703386,0.0016997574,0.00017475605,0.00001203535,0.00020907781,0.00018499541,0.000025016072,0.022687793],"genre_scores_gemma":[0.998133,0.00006475485,0.00074476283,0.0000033178285,0.0000011625845,0.00006212655,0.000070387265,0.000002848711,0.0009176544],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9937756,0.0019204397,0.0008407477,0.00023060686,0.0023938525,0.0008387124],"domain_scores_gemma":[0.98248774,0.004654091,0.0040084957,0.00034749045,0.0049411673,0.0035610704],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006682711,0.00045262853,0.00036784334,0.0070942785,0.001192563,0.0039077587,0.0006660123,0.00047108275,0.0039016416],"category_scores_gemma":[0.014874021,0.00018688301,0.0003610076,0.005747303,0.0010557399,0.0017221959,0.003454372,0.00042699577,0.00046485398],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043761474,0.00030853623,0.835068,0.0002657317,0.00009579086,0.0010683283,0.007301792,0.005354157,0.0007120382,0.010721399,0.0024083348,0.13625821],"study_design_scores_gemma":[0.000034809007,0.0011427087,0.90949607,0.000479676,0.00006763597,0.00130686,0.047431786,0.018274004,0.0018081923,0.0045750453,0.01526064,0.0001226762],"about_ca_topic_score_codex":0.0077451374,"about_ca_topic_score_gemma":0.008649562,"teacher_disagreement_score":0.0077451374,"about_ca_system_score_codex":0.0032104524,"about_ca_system_score_gemma":0.0038397247,"threshold_uncertainty_score":0.035341978},"labels":[],"label_agreement":null},{"id":"W1973266242","doi":"10.1108/17465641011068839","title":"Knowledge construction and risk induction/mitigation in dialogical workgroup processes","year":2010,"lang":"en","type":"article","venue":"Qualitative Research in Organizations and Management An International Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Workgroup; Dialogical self; Context (archaeology); Knowledge management; Originality; Sociology; Empirical research; Viewpoints; Epistemology; Qualitative research; Social psychology; Psychology; Computer science; Social science","score_opus":0.2040998484401182,"score_gpt":0.54410695333416,"score_spread":0.34000710489404185,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1973266242","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82818097,0.0008223109,0.10726274,0.004387024,0.000094884956,0.0006222087,0.000031085583,0.00021133035,0.058387507],"genre_scores_gemma":[0.9885173,0.000102780985,0.009105999,0.00010485895,0.000022714457,0.00010531123,0.000014440197,0.000016449065,0.002010084],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.96272665,0.03012467,0.0008027473,0.0019005169,0.0029683532,0.0014770199],"domain_scores_gemma":[0.9418753,0.042984843,0.0069729914,0.0037284882,0.0021170527,0.0023214205],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022990057,0.00073804054,0.00036603134,0.0030350233,0.010171266,0.008611431,0.00211315,0.002566311,0.004200127],"category_scores_gemma":[0.04379316,0.000506166,0.0006781556,0.0011100876,0.01624348,0.0078742625,0.01298675,0.0022355427,0.000538112],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018760201,0.0003824173,0.020591768,0.0004260895,0.000057528177,0.0018683961,0.8313231,0.001994336,0.0040448387,0.068319924,0.0007410387,0.07006299],"study_design_scores_gemma":[0.00008750771,0.00068016053,0.027635593,0.0009949825,0.000099972494,0.0014734376,0.7379762,0.010473646,0.006419509,0.15616433,0.057775438,0.0002191835],"about_ca_topic_score_codex":0.001770469,"about_ca_topic_score_gemma":0.0015209616,"teacher_disagreement_score":0.022990057,"about_ca_system_score_codex":0.004020454,"about_ca_system_score_gemma":0.005401884,"threshold_uncertainty_score":0.121584535},"labels":[],"label_agreement":null},{"id":"W1973823380","doi":"10.5539/mas.v3n7p103","title":"Malaysian Practitioner’s Perception on Knowledge Management in Construction Consulting Companies","year":2009,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Perception; Business; Variety (cybernetics); Knowledge management; Public relations; Marketing; Psychology; Computer science; Political science","score_opus":0.0670590703511075,"score_gpt":0.3625927623696597,"score_spread":0.2955336920185522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1973823380","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98986536,0.0005530658,0.00039569085,0.0026960033,0.000019279221,0.000016635395,0.000015081979,0.000007141398,0.0064317225],"genre_scores_gemma":[0.99763715,0.0005343224,0.0001592566,0.0003345257,0.000006275953,0.000006930099,0.000008623109,0.0000030732251,0.0013097043],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.995808,0.001806584,0.00021270436,0.00024277056,0.0012511407,0.0006786702],"domain_scores_gemma":[0.989677,0.0041406127,0.0022069162,0.00018710973,0.0015540215,0.0022343532],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037134378,0.00016563934,0.00024642496,0.0010436375,0.0027237039,0.0026002638,0.00042998182,0.001341942,0.0028999613],"category_scores_gemma":[0.008960513,0.00027319268,0.00013425694,0.0009302013,0.0019662664,0.0017823974,0.0014982775,0.0011076465,0.00031423118],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056512927,0.00013793682,0.09539315,0.00039746778,0.000012091791,0.0037424753,0.8615501,0.00024282749,0.004639014,0.0020550508,0.0026909753,0.029082512],"study_design_scores_gemma":[0.0000048403367,0.00018390952,0.054500055,0.00035432825,0.0000070281553,0.0016835183,0.92444766,0.00043676075,0.0003303832,0.00038825048,0.017627548,0.000035709516],"about_ca_topic_score_codex":0.0133658275,"about_ca_topic_score_gemma":0.016925685,"teacher_disagreement_score":0.0133658275,"about_ca_system_score_codex":0.002636671,"about_ca_system_score_gemma":0.0039903694,"threshold_uncertainty_score":0.026576102},"labels":[],"label_agreement":null},{"id":"W1975690628","doi":"10.1002/pmj.20249","title":"Structuring of Temporary Multi-Organizations: Contingency Theory in the Building Sector","year":2011,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"","keywords":"Structuring; Contingency; Contingency theory; Procurement; Knowledge management; Business; Work (physics); Interdependence; Organizational structure; Process management; Organizational theory; Computer science; Engineering; Management; Sociology; Marketing; Economics","score_opus":0.14797738214815026,"score_gpt":0.3604683669419241,"score_spread":0.21249098479377382,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1975690628","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5110933,0.004299213,0.3437507,0.007409141,0.000120486024,0.00044333312,0.00012415095,0.00014971435,0.13260998],"genre_scores_gemma":[0.98019224,0.00055755227,0.017928474,0.00008072434,0.000025825935,0.00009759666,0.000031293614,0.000009302889,0.001076978],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9974897,0.0013620998,0.00010564454,0.00022729348,0.00041592238,0.00039936657],"domain_scores_gemma":[0.99512815,0.0023768188,0.00085834204,0.00051779044,0.0004631627,0.000655698],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027676078,0.00019055155,0.00025897202,0.0020509504,0.0021319839,0.003569912,0.0009233337,0.0008693173,0.0024361962],"category_scores_gemma":[0.0048172423,0.000348289,0.000525247,0.0014690364,0.009591674,0.004553398,0.0023712746,0.0009227128,0.00022212666],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003640433,0.00006128558,0.009305809,0.00009057836,0.000018778092,0.0004169749,0.007232237,0.0132628195,0.00043230614,0.94748783,0.0007641151,0.02089086],"study_design_scores_gemma":[0.000027917917,0.000090956026,0.010321985,0.00018221095,0.000016380103,0.00037531764,0.012539907,0.032162793,0.0002475839,0.9331685,0.010825598,0.00004072731],"about_ca_topic_score_codex":0.0032857177,"about_ca_topic_score_gemma":0.0034917668,"teacher_disagreement_score":0.003569912,"about_ca_system_score_codex":0.0031426789,"about_ca_system_score_gemma":0.0029794872,"threshold_uncertainty_score":0.022801876},"labels":[],"label_agreement":null},{"id":"W1976161874","doi":"10.3821/1913-701x(2008)141[58:gracsi]2.0.co;2","title":"Generic rebates: A case study in issue management","year":2008,"lang":"en","type":"article","venue":"Canadian Pharmacists Journal / Revue des Pharmaciens du Canada","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Computer science","score_opus":0.16662779728404237,"score_gpt":0.36142328159362247,"score_spread":0.1947954843095801,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1976161874","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.977192,0.00057817274,0.0025826208,0.0048764297,0.000084101615,0.00023957451,0.00007610827,0.000048810572,0.014322159],"genre_scores_gemma":[0.9888094,0.00066132407,0.003987788,0.0005863003,0.000085106,0.00006188813,0.000050113995,0.000032401575,0.0057256687],"study_design_codex":"case_report","study_design_gemma":"qualitative","domain_scores_codex":[0.99529415,0.0026194023,0.00022915186,0.00023390871,0.00085044483,0.0007729908],"domain_scores_gemma":[0.9776354,0.014614895,0.0022673835,0.0006138998,0.0017083562,0.0031601442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003873387,0.0005247919,0.00042661556,0.0015634446,0.008107136,0.002920166,0.001790103,0.0067665647,0.0052277134],"category_scores_gemma":[0.022350434,0.00054158585,0.0007005212,0.0015800603,0.0017196309,0.0019803378,0.0017300237,0.0031169741,0.0006655878],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012615639,0.022541277,0.20922674,0.0011509823,0.0002250371,0.35944733,0.14087653,0.016080966,0.005712463,0.019887637,0.0269797,0.19660968],"study_design_scores_gemma":[0.0008114104,0.0066645993,0.20883758,0.0009666991,0.00030355447,0.17863755,0.35379985,0.058761466,0.007364446,0.01073586,0.17267026,0.0004466907],"about_ca_topic_score_codex":0.01590528,"about_ca_topic_score_gemma":0.03484132,"teacher_disagreement_score":0.01590528,"about_ca_system_score_codex":0.0041399794,"about_ca_system_score_gemma":0.0035217516,"threshold_uncertainty_score":0.03162545},"labels":[],"label_agreement":null},{"id":"W1976184907","doi":"10.1108/17538371211192946","title":"Project management maturity: a critical analysis of existing and emergent factors","year":2012,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Maturity (psychological); Capability Maturity Model; Knowledge management; Context (archaeology); Project management; OPM3; Process management; Exploratory research; Computer science; Process (computing); Flexibility (engineering); Psychology; Project management triangle; Sociology; Engineering; Management; Systems engineering","score_opus":0.19851571462812626,"score_gpt":0.451636219109878,"score_spread":0.2531205044817517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1976184907","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.74423605,0.0041449186,0.18916242,0.014791241,0.00031554388,0.0035067752,0.0003771221,0.00033099824,0.04313487],"genre_scores_gemma":[0.92230356,0.0012493607,0.073591,0.00034491924,0.00004942684,0.0011095715,0.0001364858,0.00008482877,0.0011308442],"study_design_codex":"qualitative","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9703443,0.017257504,0.002336171,0.001928038,0.0070750876,0.0010588854],"domain_scores_gemma":[0.8193434,0.13188429,0.009076559,0.0055633304,0.03150187,0.0026304775],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.05884006,0.00065740803,0.000590992,0.0075219036,0.0049510035,0.010822746,0.0013076657,0.000774675,0.0014918639],"category_scores_gemma":[0.12772934,0.0006232148,0.00059238914,0.004594496,0.0072626923,0.0129306195,0.0049970397,0.003671668,0.00018313977],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016543527,0.00019780482,0.093299605,0.0018157427,0.00008820648,0.0007784417,0.49532568,0.00094711105,0.004350229,0.0924661,0.00424145,0.30632415],"study_design_scores_gemma":[0.00003463245,0.000512652,0.11803336,0.0037206453,0.00013257668,0.0014707048,0.7017847,0.009153669,0.0038092104,0.06351123,0.09757758,0.00025909877],"about_ca_topic_score_codex":0.003511682,"about_ca_topic_score_gemma":0.003383378,"teacher_disagreement_score":0.05884006,"about_ca_system_score_codex":0.009089611,"about_ca_system_score_gemma":0.013269012,"threshold_uncertainty_score":0.31117964},"labels":[],"label_agreement":null},{"id":"W1976373922","doi":"10.1108/02656710810843559","title":"Project portfolio management for product innovation","year":2008,"lang":"en","type":"article","venue":"International Journal of Quality & Reliability Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":226,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"New product development; Project portfolio management; Portfolio; Product (mathematics); Originality; Process management; Service (business); Business; Project management; Sample (material); Process (computing); Knowledge management; Marketing; Computer science; Engineering; Systems engineering; Qualitative research; Mathematics","score_opus":0.19986916122425025,"score_gpt":0.46331648337198694,"score_spread":0.2634473221477367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1976373922","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.109497145,0.022549916,0.49716333,0.021305177,0.0009895851,0.0026751917,0.00043593746,0.0017783338,0.3436054],"genre_scores_gemma":[0.57681423,0.009911366,0.37782645,0.0014521969,0.0003699681,0.0020170142,0.0005440999,0.0002844348,0.030780377],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.97619253,0.01255665,0.001632164,0.0013304321,0.0075190463,0.00076916756],"domain_scores_gemma":[0.970508,0.010878261,0.00505542,0.005898217,0.0053291335,0.0023309966],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.023700513,0.0006053143,0.0005799914,0.0037878898,0.0018450998,0.008863816,0.0017067678,0.0011403017,0.009841094],"category_scores_gemma":[0.047224198,0.00036327235,0.00055927737,0.004906041,0.0019710427,0.006167662,0.006551541,0.001584913,0.0025953923],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004349069,0.00021051905,0.0069863754,0.00062286435,0.000054988923,0.00009127606,0.0017564925,0.0028416577,0.0005959756,0.08259985,0.009212122,0.8949843],"study_design_scores_gemma":[0.00010211722,0.0012041124,0.024164964,0.0042424574,0.00011504946,0.0010048788,0.0063580447,0.02025659,0.0036823007,0.37075573,0.5679909,0.00012282016],"about_ca_topic_score_codex":0.0010509178,"about_ca_topic_score_gemma":0.0010777906,"teacher_disagreement_score":0.023700513,"about_ca_system_score_codex":0.0032822387,"about_ca_system_score_gemma":0.008537866,"threshold_uncertainty_score":0.12534183},"labels":[],"label_agreement":null},{"id":"W1976689162","doi":"10.1115/ipc2004-0685","title":"Simulation Tool to Select the Most Optimum Route for Pipeline Projects","year":2004,"lang":"en","type":"article","venue":"2004 International Pipeline Conference, Volumes 1, 2, and 3","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Pipeline (software); Computer science; Process (computing); Risk analysis (engineering); Operations research; Decision support system; Engineering; Data mining","score_opus":0.06794918584430613,"score_gpt":0.3567911127044932,"score_spread":0.28884192686018706,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1976689162","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08022286,0.00021217071,0.8820469,0.00060961366,0.00011087342,0.00050880754,0.0018054093,0.005570649,0.028912842],"genre_scores_gemma":[0.55727404,0.0005257451,0.43020108,0.00012612708,0.000025367317,0.0015593753,0.0017914098,0.00052718655,0.007969653],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995994,0.00019720393,0.000027401375,0.0000363003,0.00009944116,0.000040238825],"domain_scores_gemma":[0.99799675,0.0014745522,0.00009574857,0.0000814928,0.00027729955,0.00007402935],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001210901,0.00081393216,0.0008264021,0.0011092447,0.0006126515,0.0011473228,0.0013501934,0.0014553727,0.01401686],"category_scores_gemma":[0.0044368473,0.00062100356,0.0009210413,0.0010455113,0.00030054615,0.0009542156,0.00068806426,0.00091759715,0.001013124],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005772822,0.000047707406,0.0008119573,0.000052915973,0.000018469744,0.00004711254,0.00004345296,0.9862795,0.00051799114,0.004909324,0.0013711316,0.00584272],"study_design_scores_gemma":[0.000027546384,0.000017751156,0.00006215156,0.000010682425,0.00000590132,0.000009669746,0.000012164118,0.99649125,0.0003565279,0.00134181,0.0016586058,0.000005934607],"about_ca_topic_score_codex":0.010000768,"about_ca_topic_score_gemma":0.007674098,"teacher_disagreement_score":0.01401686,"about_ca_system_score_codex":0.0009776927,"about_ca_system_score_gemma":0.0016744576,"threshold_uncertainty_score":0.046891093},"labels":[],"label_agreement":null},{"id":"W1979057341","doi":"10.1108/02621710510572362","title":"The critical success factors in the client‐consulting relationship","year":2005,"lang":"en","type":"article","venue":"Journal of Management Development","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":175,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Bell (Canada); Concordia University","funders":"","keywords":"Deliverable; Critical success factor; Project management; Business; Order (exchange); Marketing; Psychology; Knowledge management; Operations management; Management; Computer science; Engineering","score_opus":0.12739201915860257,"score_gpt":0.39881940637971053,"score_spread":0.27142738722110793,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1979057341","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9765593,0.0005516377,0.0024804922,0.001327527,0.000028633265,0.00011842177,0.000012496118,0.000033778346,0.018887741],"genre_scores_gemma":[0.9988165,0.00011835328,0.000554534,0.00004062071,0.000010094337,0.00002796609,0.000005071667,0.000006410381,0.00042040952],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.980027,0.009504672,0.0007716525,0.00063945283,0.006864755,0.002192476],"domain_scores_gemma":[0.89576143,0.061228186,0.01237677,0.0020350544,0.009542772,0.019055715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008537067,0.00041648457,0.00036456663,0.003077625,0.0043131863,0.0071675135,0.0008916903,0.0009208315,0.005669817],"category_scores_gemma":[0.055772305,0.00049427425,0.0002696822,0.0018186684,0.005777411,0.0019453096,0.0029862754,0.002004596,0.00056208245],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00053431664,0.0014219503,0.5933785,0.0005903391,0.00016102752,0.004675475,0.15017818,0.0011420854,0.0029448003,0.028736873,0.005539248,0.21069719],"study_design_scores_gemma":[0.00009884217,0.0011477155,0.69825274,0.0007018822,0.000121129124,0.007842972,0.23497933,0.0057794615,0.0025250283,0.023340093,0.024983428,0.00022736785],"about_ca_topic_score_codex":0.005196704,"about_ca_topic_score_gemma":0.0041544205,"teacher_disagreement_score":0.008537067,"about_ca_system_score_codex":0.0044570714,"about_ca_system_score_gemma":0.007178196,"threshold_uncertainty_score":0.04514885},"labels":[],"label_agreement":null},{"id":"W1979713004","doi":"10.1002/pmj.21258","title":"Sustainable Development in the Building Sector: A Canadian Case Study on the Alignment of Strategic and Tactical Management","year":2012,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University; Université de Montréal","funders":"","keywords":"Documentation; Business; Process management; Sustainable development; Project management; Strategic planning; Strategic management; Knowledge management; Engineering management; Engineering; Marketing; Political science; Computer science; Systems engineering","score_opus":0.1777961176454587,"score_gpt":0.3796866912059678,"score_spread":0.20189057356050913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1979713004","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9801222,0.00055684237,0.00091210427,0.0017805384,0.00001246178,0.0002207703,0.00016436559,0.0000110777555,0.016219726],"genre_scores_gemma":[0.990225,0.0010668157,0.0025885985,0.00024878417,0.000003820714,0.00007734373,0.00008995856,0.00001306929,0.0056866244],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9952402,0.0015089363,0.00011356127,0.00024494217,0.0013791223,0.0015132582],"domain_scores_gemma":[0.99569905,0.0014874298,0.00033862863,0.00017381417,0.0014190067,0.00088202296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004001859,0.0005858344,0.00047307875,0.0016385597,0.024298392,0.003556689,0.0021001985,0.0017458444,0.0021796145],"category_scores_gemma":[0.0066890228,0.0004770963,0.00030358264,0.0062566954,0.005375094,0.0015956538,0.0031481155,0.002014575,0.0001933809],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021831018,0.00057797175,0.051632177,0.00051341933,0.000028290546,0.012632662,0.83745027,0.0025721965,0.0043587363,0.021404257,0.006430203,0.062181447],"study_design_scores_gemma":[0.00002712337,0.00018799865,0.052868143,0.00025463177,0.000034216333,0.0015313164,0.88417333,0.001661729,0.0017098227,0.00096193305,0.05649896,0.0000907986],"about_ca_topic_score_codex":0.9813829,"about_ca_topic_score_gemma":0.9954926,"teacher_disagreement_score":0.077197164,"about_ca_system_score_codex":0.077197164,"about_ca_system_score_gemma":0.101150535,"threshold_uncertainty_score":0.56010723},"labels":[],"label_agreement":null},{"id":"W1979987888","doi":"10.1080/0144619032000111232","title":"Innovation in clean-room construction: a case study of co-operation between firms","year":2003,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Liminality; Multinational corporation; Negotiation; Business; Process (computing); Function (biology); Construct (python library); Flexibility (engineering); Workspace; Industrial organization; Knowledge management; Management; Finance; Sociology; Economics; Computer science","score_opus":0.09243541628620355,"score_gpt":0.3367056255101551,"score_spread":0.24427020922395154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1979987888","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98693097,0.00031707142,0.0031106628,0.0007272373,0.000014210143,0.00010285442,0.000014431552,0.000014320693,0.0087683555],"genre_scores_gemma":[0.99515593,0.00032405037,0.0019436294,0.00009237928,0.000012244424,0.000077759185,0.00002165153,0.000009994561,0.0023624739],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9810136,0.013629352,0.00031590433,0.0010066037,0.001677049,0.0023575486],"domain_scores_gemma":[0.96971077,0.023190381,0.0017380225,0.0015269466,0.00118875,0.002645234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009526736,0.0004991238,0.00064839364,0.002238413,0.014669705,0.0065307976,0.002809604,0.004748491,0.0027737261],"category_scores_gemma":[0.016171655,0.0005664928,0.00057830993,0.0030701375,0.008321349,0.004323731,0.006864614,0.0025944074,0.0004982266],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005838386,0.002575415,0.05912132,0.00049536343,0.00008174596,0.038757585,0.77499455,0.0039020134,0.003994625,0.03515374,0.002098121,0.078241676],"study_design_scores_gemma":[0.00014970731,0.0011072871,0.025012057,0.00029675083,0.00006228796,0.0066105607,0.9056202,0.006067687,0.0031504198,0.005503508,0.04629526,0.00012432114],"about_ca_topic_score_codex":0.012317418,"about_ca_topic_score_gemma":0.030768039,"teacher_disagreement_score":0.014669705,"about_ca_system_score_codex":0.0054504946,"about_ca_system_score_gemma":0.0041705533,"threshold_uncertainty_score":0.050382793},"labels":[],"label_agreement":null},{"id":"W1980096249","doi":"10.1108/17538371111144166","title":"The social reality of organisational project management at the interface between networks and hierarchy","year":2011,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Project management; Corporate governance; Deliverable; Negotiation; Knowledge management; Transaction cost; Process management; Hierarchy; Actor–network theory; Sociology; Computer science; Business; Management science; Management; Engineering; Political science; Economics","score_opus":0.1399958500124964,"score_gpt":0.4013243254283813,"score_spread":0.2613284754158849,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1980096249","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3591978,0.0062293517,0.07180978,0.10943727,0.0007042309,0.00026097556,0.000110495675,0.00012078872,0.4521292],"genre_scores_gemma":[0.98706806,0.0012445311,0.0062092436,0.0012335343,0.00015849901,0.0001548138,0.000017296712,0.000042247764,0.0038717375],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9410355,0.050553225,0.0007475259,0.0018296703,0.004497661,0.001336389],"domain_scores_gemma":[0.963955,0.024100883,0.00417571,0.0031608066,0.0018984211,0.0027091987],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.025897354,0.00038041655,0.00034105292,0.0028832871,0.016449241,0.02140904,0.0018841533,0.0032686158,0.0038588042],"category_scores_gemma":[0.028682968,0.00059701834,0.00040863093,0.0031224994,0.06920247,0.023769269,0.011865185,0.0041997046,0.0005493391],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002294175,0.00003856226,0.0024708977,0.00016450178,0.000014940444,0.000561851,0.23123282,0.0007732473,0.00029365605,0.7362282,0.0036576944,0.024540715],"study_design_scores_gemma":[0.000022159527,0.00007701703,0.0036047553,0.0006825264,0.000018145702,0.0007963847,0.32275528,0.0017392302,0.00026506046,0.47214916,0.19781773,0.000072685885],"about_ca_topic_score_codex":0.004673759,"about_ca_topic_score_gemma":0.0042322907,"teacher_disagreement_score":0.025897354,"about_ca_system_score_codex":0.007440396,"about_ca_system_score_gemma":0.008438773,"threshold_uncertainty_score":0.13695991},"labels":[],"label_agreement":null},{"id":"W1980464116","doi":"10.1061/(asce)1052-3928(2007)133:2(116)","title":"Raising the Bar for Civil Engineering Education: Systems Thinking Approach","year":2007,"lang":"en","type":"article","venue":"Journal of Professional Issues in Engineering Education and Practice","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Counterintuitive; Curriculum; Engineering; Systems thinking; Engineering ethics; Engineering education; Engineering management; Computer science; Sociology; Pedagogy; Artificial intelligence","score_opus":0.06968967241681691,"score_gpt":0.4288801016518794,"score_spread":0.3591904292350625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1980464116","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018950464,0.014742493,0.72787243,0.11907628,0.0016645415,0.00020751928,0.00007886472,0.00033779195,0.11706957],"genre_scores_gemma":[0.67228866,0.012438618,0.2946997,0.006939601,0.0022066387,0.00067172485,0.00007987546,0.00009014559,0.010585025],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9949864,0.003208836,0.00018685978,0.0003816453,0.00096587907,0.0002704862],"domain_scores_gemma":[0.9898185,0.007958558,0.00048588164,0.0003726295,0.0008918842,0.00047250735],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0069757495,0.0007585786,0.00086397206,0.0027030923,0.0018579785,0.0076235365,0.0020054241,0.0030618007,0.0036860856],"category_scores_gemma":[0.0064342725,0.00035758116,0.0010730758,0.0014389113,0.011095121,0.0059847967,0.0029164793,0.0039909664,0.00044226446],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009803293,0.000043050783,0.00046658664,0.00020364618,0.00003794811,0.00008913033,0.0011260042,0.0102446675,0.00014175165,0.9682891,0.0021748075,0.017173557],"study_design_scores_gemma":[0.000012403054,0.000026306441,0.00011876805,0.00016124058,0.000010268206,0.000026652704,0.0006511212,0.009905733,0.00010398299,0.9729206,0.016049942,0.000012894332],"about_ca_topic_score_codex":0.0028326146,"about_ca_topic_score_gemma":0.002796845,"teacher_disagreement_score":0.0076235365,"about_ca_system_score_codex":0.006205043,"about_ca_system_score_gemma":0.0064276913,"threshold_uncertainty_score":0.04502088},"labels":[],"label_agreement":null},{"id":"W1981137850","doi":"10.1061/(asce)co.1943-7862.0000072","title":"Analysis of Observed Skill Affinity Patterns and Motivation for Multiskilling among Craft Workers in the U.S. Industrial Construction Sector","year":2009,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Craft; Workforce; Certification; Productivity; Economic shortage; Quality (philosophy); Set (abstract data type); Duration (music); Work (physics); Cluster (spacecraft); Business; Demographic economics; Operations management; Computer science; Economics; Engineering; Management; Geography; Economic growth; Mechanical engineering","score_opus":0.0774204397000185,"score_gpt":0.2900160296086668,"score_spread":0.2125955899086483,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981137850","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99981445,0.000005919832,0.000043047432,0.000009259703,2.5419936e-7,0.0000029038938,0.000036558453,6.061121e-7,0.00008704108],"genre_scores_gemma":[0.99966085,0.000013838438,0.0001278861,0.0000047224066,7.109541e-7,0.0000066161715,0.00009956978,3.936452e-7,0.00008536032],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995221,0.00015409607,0.00005006384,0.00007910519,0.000109219625,0.000085360516],"domain_scores_gemma":[0.99549496,0.001874651,0.0013805326,0.0002262692,0.0005924752,0.00043103282],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009334116,0.00012673836,0.00013760057,0.0010061163,0.00047507155,0.0004411297,0.0002672338,0.0003050181,0.0010095071],"category_scores_gemma":[0.004253072,0.00015878346,0.0001596683,0.0010836291,0.00034090987,0.00028354334,0.0004972704,0.00036435534,0.00015082404],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013538959,0.00005044833,0.99701846,0.0000042080405,0.000007642454,0.000008539745,0.00061257667,0.000050018945,0.00020817292,0.000023031162,0.000036274487,0.0019670743],"study_design_scores_gemma":[9.5325186e-7,0.000031359727,0.9981816,0.0000019059556,0.0000017144419,0.000011982352,0.0014109926,0.00023705709,0.00004838587,0.000015223895,0.000057362784,0.0000015515774],"about_ca_topic_score_codex":0.013720313,"about_ca_topic_score_gemma":0.04077201,"teacher_disagreement_score":0.013720313,"about_ca_system_score_codex":0.0004898686,"about_ca_system_score_gemma":0.00071267446,"threshold_uncertainty_score":0.027280867},"labels":[],"label_agreement":null},{"id":"W1981675520","doi":"10.5539/emr.v4n1p5","title":"A Qualitative Enquiry into Professional Project Management Practices in the Ghanaian Construction Industry","year":2015,"lang":"en","type":"article","venue":"Engineering Management Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Popularity; Schedule; Project management; Construction industry; Business; Qualitative research; Resource (disambiguation); Knowledge management; Public relations; Engineering; Management; Political science; Sociology; Computer science; Economics","score_opus":0.5376044614312583,"score_gpt":0.5957784908708165,"score_spread":0.058174029439558184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981675520","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9829763,0.00068613305,0.0070591005,0.0023734362,0.000040349376,0.00073964166,0.00013135084,0.000011774477,0.0059819142],"genre_scores_gemma":[0.98920083,0.001172727,0.003541484,0.00069073244,0.000012604095,0.0008586472,0.00005700146,0.000009198595,0.004456774],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9920846,0.0062060803,0.00023745773,0.00026377186,0.0005167092,0.0006913519],"domain_scores_gemma":[0.9844338,0.012899822,0.000854987,0.00028330565,0.0009662511,0.0005616772],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012396848,0.00037611977,0.0004547542,0.0016721435,0.006339549,0.0022771661,0.00081994105,0.0012040243,0.0025206592],"category_scores_gemma":[0.012670228,0.00051117677,0.00019211024,0.0016767532,0.00525732,0.002678191,0.003000251,0.0014226666,0.00023891933],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023344599,0.0000654628,0.0018982618,0.00018445158,0.0000011965554,0.0006237558,0.98766285,0.000058497437,0.0010691851,0.0020831234,0.00029611363,0.0060337395],"study_design_scores_gemma":[0.0000038588687,0.000053427146,0.0013551523,0.00017454849,0.0000010646912,0.00020684033,0.9899109,0.00009086825,0.00029097204,0.00052698125,0.007379214,0.0000061507903],"about_ca_topic_score_codex":0.0040636137,"about_ca_topic_score_gemma":0.00885132,"teacher_disagreement_score":0.012396848,"about_ca_system_score_codex":0.0034562866,"about_ca_system_score_gemma":0.004752184,"threshold_uncertainty_score":0.06556153},"labels":[],"label_agreement":null},{"id":"W1981796902","doi":"10.1061/(asce)0733-9364(2005)131:5(505)","title":"Daily Windows Delay Analysis","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":80,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"USable; Computer science; Critical path method; Schedule; Window (computing); Software; Compensation (psychology); Microsoft Windows; Software engineering; Operations research; Industrial engineering; Systems engineering; Operating system; Engineering; World Wide Web","score_opus":0.01914998068231857,"score_gpt":0.281156245578874,"score_spread":0.26200626489655543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981796902","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.082777806,0.00038056512,0.89347917,0.00013125365,0.00014305503,0.00035109054,0.0022539718,0.00417764,0.01630549],"genre_scores_gemma":[0.57791096,0.0006129991,0.40244475,0.00005253529,0.000076952514,0.000496011,0.0023283788,0.0012256076,0.014851755],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99912626,0.00011502436,0.000053697586,0.00020461026,0.00041963367,0.00008073819],"domain_scores_gemma":[0.99762565,0.000907585,0.00026219786,0.00030548102,0.00082325225,0.00007591496],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008690556,0.0009348882,0.0005896751,0.0030628678,0.00051552407,0.0014664696,0.0011257527,0.0005263602,0.015293251],"category_scores_gemma":[0.0045266226,0.00036315672,0.0005625075,0.002561442,0.00029491185,0.0016063825,0.00070274743,0.00079024653,0.0023600985],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00070683245,0.00019020039,0.012326232,0.00067728036,0.0001601683,0.00041468415,0.0009754418,0.1638473,0.038134035,0.04998027,0.019126449,0.71346116],"study_design_scores_gemma":[0.000065317814,0.00040832086,0.01449043,0.000099314086,0.00012455208,0.0006828736,0.00083236344,0.8323779,0.043858018,0.034174956,0.07269019,0.00019575444],"about_ca_topic_score_codex":0.0048091775,"about_ca_topic_score_gemma":0.003927434,"teacher_disagreement_score":0.015293251,"about_ca_system_score_codex":0.0007143183,"about_ca_system_score_gemma":0.001062285,"threshold_uncertainty_score":0.05116099},"labels":[],"label_agreement":null},{"id":"W1982469114","doi":"10.1002/sdr.359","title":"Understanding and managing iterative error and change cycles in construction","year":2007,"lang":"en","type":"article","venue":"System Dynamics Review","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Seoul National University","keywords":"Schedule; Scope (computer science); Process (computing); Computer science; Project management; Risk analysis (engineering); System dynamics; Contingency; Quality (philosophy); Operations research; Process management; Systems engineering; Engineering; Artificial intelligence","score_opus":0.27914050888378666,"score_gpt":0.4029536917042426,"score_spread":0.12381318282045595,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1982469114","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3621681,0.00074360514,0.6180419,0.0017629785,0.000030926276,0.00020336248,0.000104563,0.0002890952,0.016655497],"genre_scores_gemma":[0.96864533,0.0004338902,0.029602926,0.000023927498,0.0000074989666,0.00007954017,0.000055649867,0.000021502354,0.0011296866],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99811965,0.0009311383,0.00008182901,0.00020044122,0.0005073976,0.00015955928],"domain_scores_gemma":[0.99479866,0.0032592705,0.0009921073,0.00027291643,0.0004966437,0.00018041048],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023601311,0.0005532886,0.00049154635,0.0013243537,0.00066387956,0.002316563,0.001108093,0.001186419,0.0021350211],"category_scores_gemma":[0.011704014,0.00044431727,0.0003875147,0.00094613497,0.001685895,0.0039214785,0.0019457771,0.0007288227,0.0001768731],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006133601,0.00006972414,0.0090379035,0.00011814394,0.00003984471,0.00015943007,0.0011338659,0.9044031,0.00085225224,0.038289994,0.0004182513,0.045416113],"study_design_scores_gemma":[0.00001761817,0.00006446087,0.003189583,0.000048770515,0.000021473366,0.0000836531,0.0009496638,0.94345886,0.00076588587,0.047508307,0.003867011,0.000024627836],"about_ca_topic_score_codex":0.013679792,"about_ca_topic_score_gemma":0.008387696,"teacher_disagreement_score":0.013679792,"about_ca_system_score_codex":0.0025706163,"about_ca_system_score_gemma":0.0031011738,"threshold_uncertainty_score":0.027200341},"labels":[],"label_agreement":null},{"id":"W1984009114","doi":"10.1139/l03-001","title":"Knowledge-based risk identification in infrastructure projects","year":2003,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Schema (genetic algorithms); Risk management; Identification (biology); Risk management plan; Risk analysis (engineering); Process (computing); Knowledge management; Process management; Risk assessment; IT risk management; Engineering; Business; Computer security","score_opus":0.027013981288493593,"score_gpt":0.27085445372526057,"score_spread":0.243840472436767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1984009114","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54964805,0.002143699,0.38351512,0.0053124973,0.000037813334,0.00034417896,0.0002727707,0.00025441946,0.058471516],"genre_scores_gemma":[0.9720448,0.0005567891,0.026117705,0.00003711812,0.000007865355,0.000072391595,0.000096857264,0.000005912824,0.001060474],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9956731,0.0027702206,0.00026760032,0.0002504788,0.00082356215,0.0002148796],"domain_scores_gemma":[0.99353266,0.0043041524,0.0010030898,0.00033106288,0.0006772948,0.00015172131],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004184977,0.0002803371,0.00031552173,0.0024138452,0.0010385212,0.004286775,0.00085144065,0.0014349929,0.0013869044],"category_scores_gemma":[0.021247404,0.00032682845,0.0003978799,0.0019679281,0.0015436823,0.005081377,0.0027702819,0.00090001523,0.00017066501],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028562348,0.00030816608,0.040690247,0.00042181768,0.00011676409,0.0014052012,0.01022248,0.31146124,0.0010596606,0.3200295,0.0038855632,0.3101137],"study_design_scores_gemma":[0.0000392391,0.00010861854,0.015096449,0.00037543813,0.00008075225,0.0005213894,0.009283901,0.5918688,0.0016815959,0.36893028,0.01191502,0.00009850053],"about_ca_topic_score_codex":0.017443407,"about_ca_topic_score_gemma":0.010998493,"teacher_disagreement_score":0.017443407,"about_ca_system_score_codex":0.0032955972,"about_ca_system_score_gemma":0.0031995089,"threshold_uncertainty_score":0.034683764},"labels":[],"label_agreement":null},{"id":"W1984359850","doi":"10.3763/aedm.2009.0110","title":"Relationships between Construction Clients and Participants of the Building Industry: Structures and Mechanisms of Coordination and Communication","year":2011,"lang":"en","type":"article","venue":"Architectural Engineering and Design Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université de Montréal","funders":"","keywords":"Procurement; Business; Knowledge management; Construction industry; Corporate governance; Order (exchange); Process management; Public relations; Organizational structure; Marketing; Engineering; Management; Computer science; Political science","score_opus":0.1458292061480229,"score_gpt":0.3048245501144367,"score_spread":0.15899534396641382,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1984359850","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96894777,0.00030265137,0.0076573896,0.0017831584,0.000006585023,0.000106960986,0.00002590291,0.000028104232,0.02114149],"genre_scores_gemma":[0.99877614,0.00006293179,0.00059215113,0.000023303111,0.0000021797448,0.000028020862,0.0000054128495,0.0000032858,0.0005066235],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9712931,0.020746848,0.0008687478,0.0013424625,0.0036791803,0.0020696237],"domain_scores_gemma":[0.95107156,0.03415607,0.0063305367,0.0019242252,0.003896513,0.0026210847],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017110601,0.0003179668,0.0005655737,0.002503362,0.007298544,0.012381423,0.0016189003,0.0020087261,0.0068873023],"category_scores_gemma":[0.03993111,0.00060694973,0.00020721245,0.0019333793,0.013416971,0.005326796,0.006008384,0.0014975286,0.00040750008],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022808762,0.00016349106,0.11892845,0.00021271198,0.000045372126,0.0012661912,0.75199264,0.0011415719,0.0028177998,0.07661567,0.0008525471,0.04573537],"study_design_scores_gemma":[0.000055239652,0.00015865665,0.04850786,0.00037809115,0.000044839893,0.0007787734,0.9073774,0.004089733,0.0012251369,0.024422335,0.012882688,0.00007928547],"about_ca_topic_score_codex":0.023474995,"about_ca_topic_score_gemma":0.011868484,"teacher_disagreement_score":0.023474995,"about_ca_system_score_codex":0.0083741,"about_ca_system_score_gemma":0.012158211,"threshold_uncertainty_score":0.09049058},"labels":[],"label_agreement":null},{"id":"W1985872311","doi":"10.1002/pmj.20137","title":"Project Success as a Topic in Project Management Journals","year":2009,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":773,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec en Outaouais","funders":"Université du Québec à Montréal","keywords":"Project portfolio management; Project management; Project management triangle; Project charter; OPM3; Extreme project management; Program management; Management science; Engineering management; Knowledge management; Sociology; Engineering ethics; Process management; Computer science; Business; Engineering; Systems engineering","score_opus":0.11018101101062455,"score_gpt":0.4360891239896326,"score_spread":0.32590811297900807,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1985872311","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":"evaluation","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":"evaluation","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78526217,0.12511624,0.0043895077,0.016079536,0.0029029688,0.00027466138,0.0014505538,0.00016716763,0.0643572],"genre_scores_gemma":[0.9569977,0.029375352,0.003074243,0.0012564766,0.0033280095,0.00031978716,0.0010915125,0.00017208632,0.0043849386],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.968591,0.011397235,0.00522243,0.0015948542,0.011761025,0.0014334727],"domain_scores_gemma":[0.58158875,0.28742898,0.062286858,0.0049402467,0.05212276,0.011632444],"candidate_categories":["metaresearch","bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.017525716,0.000363817,0.001204844,0.05366654,0.003984951,0.018194513,0.00068198016,0.0013506609,0.0033610542],"category_scores_gemma":[0.13176405,0.0003892178,0.0003707121,0.07836188,0.0041521112,0.00853774,0.004611594,0.0011233087,0.0006157415],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00083873613,0.00038860604,0.29535642,0.010499388,0.0003598528,0.0030349167,0.1732646,0.0006948845,0.0057619875,0.035017885,0.033964414,0.44081837],"study_design_scores_gemma":[0.00006781067,0.00076496607,0.47266766,0.008020079,0.00021931886,0.005824241,0.178847,0.00055804336,0.0017500097,0.008326713,0.32274857,0.00020561155],"about_ca_topic_score_codex":0.0011374446,"about_ca_topic_score_gemma":0.0018621377,"teacher_disagreement_score":0.98247427,"about_ca_system_score_codex":0.0020831442,"about_ca_system_score_gemma":0.0049176686,"threshold_uncertainty_score":0.09268594},"labels":[],"label_agreement":null},{"id":"W1986733737","doi":"10.1016/j.ijproman.2011.11.004","title":"Professionalization, risk transfer, and the effect on gender gap in project management","year":2011,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":38,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université TÉLUQ","funders":"","keywords":"Overtime; Workforce; Professionalization; Autonomy; Work (physics); Discretion; Control (management); Obstacle; Risk management; Position (finance); Business; Public relations; Engineering; Management; Political science; Sociology; Labour economics; Economics; Economic growth; Finance; Social science","score_opus":0.11341219606343596,"score_gpt":0.3869814685257342,"score_spread":0.27356927246229823,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1986733737","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99415165,0.00015466684,0.00016814147,0.0007542235,0.000013334379,0.000010886941,0.000013348044,0.0000026489045,0.0047310744],"genre_scores_gemma":[0.9992268,0.000038800703,0.00004318145,0.000036639165,0.0000067392916,0.0000064339038,0.0000051024863,0.0000015732293,0.00063470594],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99631256,0.0020509914,0.00012998478,0.00020162296,0.0005303626,0.00077457697],"domain_scores_gemma":[0.9547033,0.027675644,0.004488429,0.0010450527,0.001778293,0.010309324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0057002236,0.00013074,0.00028530814,0.00064719777,0.0016674966,0.0020081373,0.00064124283,0.00111952,0.011355101],"category_scores_gemma":[0.031417526,0.00017105944,0.0003112677,0.00052386057,0.0019607777,0.001143296,0.0025163107,0.0015468701,0.00063243276],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0033550397,0.0045741317,0.8944663,0.00007462113,0.00006566008,0.0008385732,0.02111502,0.00095089735,0.0018164741,0.00784887,0.0012147349,0.063679695],"study_design_scores_gemma":[0.000112146845,0.00063045113,0.9624621,0.000085293555,0.00003106917,0.00036955965,0.027962362,0.0014538923,0.00052774284,0.0045887996,0.0017566734,0.000019852474],"about_ca_topic_score_codex":0.0049593407,"about_ca_topic_score_gemma":0.0050927247,"teacher_disagreement_score":0.011355101,"about_ca_system_score_codex":0.0013013373,"about_ca_system_score_gemma":0.004676202,"threshold_uncertainty_score":0.037986577},"labels":[],"label_agreement":null},{"id":"W1987465823","doi":"10.1108/13683040510588800","title":"Business performance measurement practices in construction engineering organisations","year":2005,"lang":"en","type":"article","venue":"Measuring Business Excellence","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":82,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Engineering and Physical Sciences Research Council; Loughborough University","keywords":"Balanced scorecard; Performance measurement; Operational excellence; Excellence; Performance indicator; Originality; Process management; Business; Engineering management; Marketing; Engineering; Creativity","score_opus":0.1733989554486097,"score_gpt":0.3096560784264789,"score_spread":0.1362571229778692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1987465823","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97672343,0.0024444154,0.007927701,0.004325871,0.0000451282,0.00016905776,0.000029661547,0.00005475729,0.008279909],"genre_scores_gemma":[0.9943456,0.00084389927,0.004089616,0.0001899437,0.000012546295,0.00008722203,0.000025372558,0.00000559311,0.00040015962],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9391544,0.0416097,0.0030301833,0.0019829425,0.011984252,0.0022385612],"domain_scores_gemma":[0.896313,0.060835045,0.01820649,0.0040267394,0.015875379,0.00474329],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.034098964,0.00025268638,0.00039629306,0.0038923114,0.0026166704,0.0037720788,0.0009308032,0.0009101228,0.000831005],"category_scores_gemma":[0.076914474,0.00022771956,0.0002003047,0.0048386706,0.0029195538,0.0022096373,0.0031705769,0.0009505783,0.00020376398],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002750194,0.00064349145,0.2623697,0.0016115457,0.00008773231,0.00073572376,0.2474287,0.0019101658,0.0049195634,0.007991295,0.0030151398,0.4690119],"study_design_scores_gemma":[0.000071240866,0.0026934203,0.46350074,0.0026403225,0.000072052586,0.0019620128,0.42938572,0.0063848393,0.004865053,0.01389113,0.07419366,0.0003398833],"about_ca_topic_score_codex":0.0030581118,"about_ca_topic_score_gemma":0.0026208314,"teacher_disagreement_score":0.034098964,"about_ca_system_score_codex":0.0042413734,"about_ca_system_score_gemma":0.005305263,"threshold_uncertainty_score":0.18033475},"labels":[],"label_agreement":null},{"id":"W1987479515","doi":"10.1061/(asce)0733-9364(2004)130:6(853)","title":"Risks in Chinese Construction Market—Contractors’ Perspective","year":2004,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":131,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Tsinghua University","keywords":"China; Business; Cronbach's alpha; Government (linguistics); Unanimity; Accession; Index (typography); Industrial organization; Marketing; International trade; Political science","score_opus":0.024891860383640406,"score_gpt":0.3193339995376016,"score_spread":0.2944421391539612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1987479515","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92626786,0.001169176,0.0015224791,0.00806053,0.00004706836,0.00006796018,0.00007414467,0.00000772253,0.06278303],"genre_scores_gemma":[0.9974075,0.00068511296,0.00009854356,0.00014381221,0.000030266183,0.000007528778,0.000011620524,0.0000013944622,0.001614048],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.997841,0.00067320414,0.00009813594,0.00012040264,0.0006175215,0.0006497097],"domain_scores_gemma":[0.99682,0.0008916558,0.00071527803,0.00009775842,0.00060200033,0.00087332295],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027914722,0.00036119198,0.00022640306,0.0027353456,0.0044655767,0.0050464054,0.00067762454,0.0014518235,0.0045660487],"category_scores_gemma":[0.0036180946,0.00021622673,0.00033217267,0.002034787,0.0048144907,0.0037670846,0.0018259368,0.0010642447,0.0001873719],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002595738,0.00057279546,0.29958656,0.0003644269,0.000083206476,0.012099639,0.24765563,0.0068065175,0.002461233,0.35765445,0.01067103,0.061784938],"study_design_scores_gemma":[0.000052376992,0.00051494053,0.3504026,0.0005763981,0.000084469604,0.003934452,0.44558746,0.029129006,0.0017542758,0.055123433,0.112505704,0.00033486512],"about_ca_topic_score_codex":0.06591552,"about_ca_topic_score_gemma":0.036765926,"teacher_disagreement_score":0.06591552,"about_ca_system_score_codex":0.008314355,"about_ca_system_score_gemma":0.008133751,"threshold_uncertainty_score":0.1310637},"labels":[],"label_agreement":null},{"id":"W1987989758","doi":"10.2495/sdp-v6-n1-1-12","title":"Infrastructure Management Methodologies in Risk Situations","year":2011,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Fundação para a Ciência e a Tecnologia","keywords":"Risk analysis (engineering); Risk management; Environmental planning; Business; Environmental resource management; Environmental science","score_opus":0.12042335131133082,"score_gpt":0.37427462995355776,"score_spread":0.25385127864222695,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1987989758","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003710901,0.0019249181,0.9664511,0.0011197585,0.000118833086,0.00010272992,0.00007249243,0.00022383692,0.026275396],"genre_scores_gemma":[0.28742304,0.0055725225,0.6899218,0.00037039645,0.00029787497,0.0005032691,0.00024833225,0.0002365577,0.015426214],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9976587,0.0011659245,0.00016417044,0.0002568206,0.0005997737,0.00015463462],"domain_scores_gemma":[0.998362,0.00086369785,0.00021510576,0.00017470137,0.0003062355,0.00007835603],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029424925,0.0014169882,0.00063589873,0.00208863,0.00080345705,0.0037896298,0.0022684713,0.0017834643,0.0049240664],"category_scores_gemma":[0.004026398,0.0006193621,0.0011402109,0.0021467141,0.0017851042,0.0036540157,0.0027678302,0.0014760167,0.0009661365],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001570589,0.00006811165,0.00045831362,0.00037083458,0.00009303395,0.00031149026,0.0005458317,0.29572576,0.000737392,0.5829112,0.004171686,0.1145907],"study_design_scores_gemma":[0.000017204075,0.00003990054,0.00019661072,0.00026129524,0.00005219211,0.00021820607,0.0006962784,0.4053438,0.00091418135,0.5287991,0.06342813,0.000033068747],"about_ca_topic_score_codex":0.0024446063,"about_ca_topic_score_gemma":0.0027327219,"teacher_disagreement_score":0.0049240664,"about_ca_system_score_codex":0.0016736024,"about_ca_system_score_gemma":0.001863119,"threshold_uncertainty_score":0.016472638},"labels":[],"label_agreement":null},{"id":"W1988546809","doi":"10.1061/(asce)sc.1943-5576.0000024","title":"Why Cost and Schedule Overruns on Mega Oil Sands Projects?","year":2009,"lang":"en","type":"article","venue":"Practice Periodical on Structural Design and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":74,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Megaproject; Schedule; Oil sands; Engineering; Project management; Civil engineering; Construction engineering; Management; Economics","score_opus":0.0837375435041139,"score_gpt":0.3692032832797533,"score_spread":0.28546573977563944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1988546809","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8036824,0.004328334,0.01767521,0.06302735,0.00083485973,0.00021109564,0.0003602034,0.00020138624,0.10967904],"genre_scores_gemma":[0.9868079,0.0018616384,0.0043756785,0.0016116293,0.00022147935,0.00007314836,0.0000975873,0.00009342498,0.0048575643],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9883773,0.0032233533,0.0005270763,0.00060494617,0.005593344,0.0016740583],"domain_scores_gemma":[0.9727465,0.011154762,0.005604609,0.0008885878,0.0069738375,0.0026316452],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007044951,0.00034598188,0.00036009055,0.0017658855,0.0026560086,0.003231099,0.0012993879,0.0018357281,0.005825585],"category_scores_gemma":[0.03735222,0.00041621272,0.00029267915,0.0028604988,0.0023994448,0.002450347,0.0017501261,0.002088344,0.00082986784],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000572991,0.00041353964,0.1777049,0.0009932844,0.0001310546,0.005062691,0.012790804,0.03907731,0.0032951757,0.1368681,0.13273318,0.490357],"study_design_scores_gemma":[0.00014246424,0.00077065144,0.4274132,0.0013850041,0.000108591,0.003448483,0.102823734,0.023680756,0.004925511,0.13036495,0.30450428,0.00043238638],"about_ca_topic_score_codex":0.026548715,"about_ca_topic_score_gemma":0.04952095,"teacher_disagreement_score":0.97345126,"about_ca_system_score_codex":0.0076298523,"about_ca_system_score_gemma":0.006323556,"threshold_uncertainty_score":0.055358768},"labels":[],"label_agreement":null},{"id":"W1988799547","doi":"10.1108/01409170610712317","title":"Project management elements as strategic assets: preliminary findings","year":2006,"lang":"en","type":"article","venue":"Management Research News","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University; University of Calgary","funders":"","keywords":"Competitive advantage; Project management triangle; Project management; Originality; Business; OPM3; Knowledge management; Resource-based view; Project portfolio management; Process management; Program management; Process (computing); Computer science; Marketing; Management; Economics","score_opus":0.24457279574647364,"score_gpt":0.47779929276994915,"score_spread":0.2332264970234755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1988799547","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9798937,0.00032646643,0.0021620411,0.0006934782,0.000009119402,0.00021113061,0.00019923232,0.0000124020435,0.016492529],"genre_scores_gemma":[0.99759275,0.00026013225,0.0010542652,0.00007255079,0.0000059262507,0.00010571462,0.00010304508,0.0000041311537,0.0008013833],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99756205,0.0010475661,0.00019791491,0.00017218447,0.0007901052,0.0002302104],"domain_scores_gemma":[0.95556563,0.03284621,0.0052711233,0.0010113661,0.0037276477,0.0015778721],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038120304,0.00034331816,0.00028447725,0.0015588676,0.0007969201,0.002053297,0.00056806643,0.00037762983,0.0054541794],"category_scores_gemma":[0.0268898,0.00028828855,0.0002870155,0.0018999676,0.0012651995,0.0023208847,0.0025320854,0.0012109384,0.00047956937],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000249884,0.00060832786,0.87796813,0.0005505394,0.00006392874,0.00055960636,0.026668128,0.0005287949,0.0014036935,0.00764313,0.0009910768,0.08276478],"study_design_scores_gemma":[0.000015486123,0.00033345347,0.90737945,0.00034671626,0.00007080209,0.0005035857,0.08027849,0.0012479982,0.00084059837,0.0029120066,0.0060555735,0.000015740632],"about_ca_topic_score_codex":0.0030538088,"about_ca_topic_score_gemma":0.003961986,"teacher_disagreement_score":0.0054541794,"about_ca_system_score_codex":0.00083024957,"about_ca_system_score_gemma":0.0029509487,"threshold_uncertainty_score":0.020160198},"labels":[],"label_agreement":null},{"id":"W1989869798","doi":"10.1002/pmj.20017","title":"New Product Development Projects: The Effects of Organizational Culture","year":2007,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":106,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"University of Florida; Cleveland State University","keywords":"Business; Organizational culture; Project management; New product development; Product (mathematics); Process management; OPM3; Operations management; Management; Knowledge management; Marketing; Project management triangle; Engineering; Economics; Computer science","score_opus":0.03593364427659248,"score_gpt":0.3284025224975019,"score_spread":0.29246887822090945,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1989869798","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9962568,0.0006454952,0.00014198375,0.00033140788,0.000014107895,0.000009573285,0.00006386053,0.00000278582,0.002533896],"genre_scores_gemma":[0.9990484,0.0003627922,0.0001159166,0.000104485494,0.000015317628,0.000010627842,0.00006342541,0.0000050787985,0.00027389705],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98988485,0.006635983,0.00038581714,0.00067147566,0.0015659174,0.0008559286],"domain_scores_gemma":[0.9315581,0.036668528,0.016108084,0.0027306709,0.0037296286,0.009204951],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0053151916,0.00037563388,0.00033616717,0.0012811462,0.0013533902,0.0031337286,0.0006397951,0.0005921732,0.0024426663],"category_scores_gemma":[0.025162518,0.00031005192,0.0005819538,0.0018416404,0.0016058091,0.0013674716,0.002769402,0.0012868538,0.00039836497],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024720153,0.0003920848,0.9797132,0.000031582615,0.00023185792,0.000084272295,0.0019841895,0.0001588485,0.0002486014,0.00023710333,0.0003034811,0.016367683],"study_design_scores_gemma":[0.0000059389367,0.00020016606,0.99635506,0.00003300824,0.000047316313,0.0000493333,0.0024811586,0.00018526323,0.00011476596,0.00010313222,0.00041451925,0.000010308624],"about_ca_topic_score_codex":0.011677089,"about_ca_topic_score_gemma":0.018230336,"teacher_disagreement_score":0.011677089,"about_ca_system_score_codex":0.0013330602,"about_ca_system_score_gemma":0.0015295539,"threshold_uncertainty_score":0.02810973},"labels":[],"label_agreement":null},{"id":"W1991686978","doi":"10.4043/13298-ms","title":"Introduction to PMI","year":2001,"lang":"en","type":"article","venue":"All Days","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Project management; Certification; Work (physics); Political science; Program management; Project manager; Public relations; Library science; Management; Business; Engineering; Computer science; Law","score_opus":0.09065739607394704,"score_gpt":0.37076525596363125,"score_spread":0.28010785988968423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1991686978","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010869161,0.010945945,0.01712128,0.04442047,0.031783078,0.00064582954,0.0035818773,0.0034960064,0.88691854],"genre_scores_gemma":[0.01051275,0.012341385,0.015164844,0.016591785,0.010216269,0.0011707598,0.0060437815,0.0018802844,0.9260781],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9964805,0.00083839666,0.0001996856,0.00057143567,0.0014457343,0.00046418555],"domain_scores_gemma":[0.9956649,0.0007774819,0.00022838119,0.00045475736,0.0017696157,0.0011049866],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003130391,0.0010428448,0.0005174322,0.0021207782,0.0025095504,0.007269963,0.0020660618,0.0024438412,0.2801825],"category_scores_gemma":[0.010575706,0.00047625953,0.0005392658,0.0031723962,0.0010315847,0.0047994084,0.0039356616,0.0044854474,0.21114217],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014752804,0.00002836362,0.00015325086,0.00010776808,0.0000012472605,0.00003174567,0.00011554134,0.000037666752,0.00009341443,0.011415262,0.9049144,0.08308658],"study_design_scores_gemma":[0.0000016528193,0.000008049773,0.00016977012,0.000052842446,3.3050458e-7,0.000044518387,0.000043943794,0.000020459434,0.00002376731,0.0012289875,0.99840325,0.0000025245013],"about_ca_topic_score_codex":0.0026987405,"about_ca_topic_score_gemma":0.00293534,"teacher_disagreement_score":0.2801825,"about_ca_system_score_codex":0.0027186908,"about_ca_system_score_gemma":0.00488446,"threshold_uncertainty_score":0.9373039},"labels":[],"label_agreement":null},{"id":"W1992494088","doi":"10.1002/pmj.20061","title":"An Empirically Grounded Search for a Typology of Project Management Offices","year":2008,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":82,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"PMOS logic; Typology; Context (archaeology); Knowledge management; Computer science; Process management; Exploit; Identification (biology); Business; Engineering; Sociology; Geography; Computer security","score_opus":0.23426592073538305,"score_gpt":0.455973268840482,"score_spread":0.22170734810509896,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1992494088","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8751035,0.0011177878,0.086196825,0.0025641841,0.00006482707,0.00085198344,0.0017321637,0.00006281973,0.03230594],"genre_scores_gemma":[0.96214175,0.00048951455,0.03437371,0.00012951154,0.000017299291,0.0005726395,0.0016958967,0.000018689821,0.00056098023],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99013746,0.004727552,0.0012783273,0.0013567087,0.002113665,0.0003863313],"domain_scores_gemma":[0.9548357,0.031181818,0.0065813605,0.003718926,0.0031832755,0.0004988925],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008055884,0.00038613114,0.00054916186,0.011957999,0.002367411,0.005695296,0.0014899741,0.0011508996,0.0029656065],"category_scores_gemma":[0.044433396,0.00032545012,0.0004896286,0.013680794,0.0036426054,0.010439026,0.002740384,0.0009915606,0.00027459496],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020727766,0.00034508607,0.44498083,0.0011771368,0.00011800698,0.0007858408,0.06527984,0.0057350057,0.0014302069,0.33672038,0.0032021892,0.14001822],"study_design_scores_gemma":[0.000113324575,0.00035623217,0.24441516,0.0024828028,0.00010277828,0.002277329,0.29312444,0.0342622,0.0019927311,0.34707913,0.07358661,0.00020739519],"about_ca_topic_score_codex":0.0026508071,"about_ca_topic_score_gemma":0.0025876064,"teacher_disagreement_score":0.011957999,"about_ca_system_score_codex":0.0027297374,"about_ca_system_score_gemma":0.002777477,"threshold_uncertainty_score":0.04260409},"labels":[],"label_agreement":null},{"id":"W1992935712","doi":"10.1080/15578770902952280","title":"The Effects of Prevailing Wage Regulations on Construction Efficiency in British Columbia","year":2009,"lang":"en","type":"article","venue":"International Journal of Construction Education and Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Legislation; Efficiency wage; Wage; Minimum wage; Economics; Sample (material); Frontier; Construction industry; Term (time); Labour economics; Engineering; Political science; Law","score_opus":0.03940547147975138,"score_gpt":0.42760243452467706,"score_spread":0.3881969630449257,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1992935712","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99263436,0.00026955252,0.0002579015,0.00034850102,0.0000063226585,0.000014550639,0.00042410652,0.000029479335,0.0060153017],"genre_scores_gemma":[0.99667645,0.00015888883,0.00012640329,0.000054305936,0.0000018928639,0.0000071905847,0.00033882048,0.0000117937225,0.0026242286],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9948833,0.0006214907,0.00024870262,0.0004862549,0.002183889,0.0015764051],"domain_scores_gemma":[0.9880939,0.0021873566,0.0024479018,0.0008488281,0.005298621,0.0011233881],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018634417,0.00021465778,0.0004621038,0.0015022735,0.0012920247,0.002361409,0.001013643,0.00039506546,0.0025090147],"category_scores_gemma":[0.0136614805,0.00037283648,0.00025492354,0.002876765,0.001274974,0.00033710303,0.00095618685,0.0008966727,0.0003908398],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047992435,0.00023172572,0.91491824,0.00009251962,0.00021297409,0.0005175058,0.0014195855,0.01768464,0.004404691,0.0026807848,0.0035286793,0.053828776],"study_design_scores_gemma":[0.0000062535473,0.00003065609,0.99561524,0.000015539395,0.000016182845,0.0000216545,0.0006265531,0.0013719213,0.00031871107,0.00007191548,0.0018895571,0.000015810425],"about_ca_topic_score_codex":0.95115936,"about_ca_topic_score_gemma":0.9752567,"teacher_disagreement_score":0.048840642,"about_ca_system_score_codex":0.02729232,"about_ca_system_score_gemma":0.017599294,"threshold_uncertainty_score":0.19802058},"labels":[],"label_agreement":null},{"id":"W1993718231","doi":"10.1139/l07-094","title":"Integrated cost and schedule control in the Korean construction industry based on a modified work-packaging model","year":2008,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Aeronautics and Space Administration","keywords":"Schedule; Work breakdown structure; Earned value management; Work (physics); Control (management); Project management; Operations research; Construction management; Engineering; Project planning; Operations management; Transport engineering; Computer science; Risk analysis (engineering); Business; Systems engineering; Civil engineering; Project charter; Mechanical engineering","score_opus":0.05152326529267989,"score_gpt":0.2568840150587532,"score_spread":0.2053607497660733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993718231","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16407947,0.00040720476,0.7973615,0.00027511732,0.000055852448,0.0003261113,0.00044127236,0.00039077044,0.036662754],"genre_scores_gemma":[0.9313045,0.00039667933,0.05833911,0.00002061527,0.000012572452,0.00029142853,0.00023450263,0.000058716912,0.0093418965],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99938214,0.00018921272,0.000039233448,0.00012039279,0.00017975927,0.00008930457],"domain_scores_gemma":[0.99958664,0.00012100281,0.00008375243,0.000033952052,0.00014395211,0.000030654115],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008229198,0.0007856674,0.0004634022,0.0007001474,0.00037322752,0.0017712404,0.0016607986,0.0006709795,0.0028940868],"category_scores_gemma":[0.001030062,0.0004659804,0.0007821501,0.0009310082,0.0005366832,0.0013253563,0.0007038064,0.00056272175,0.0003722095],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024339382,0.000033220313,0.0008617236,0.000035418052,0.000009836438,0.00006036892,0.000049983388,0.9759842,0.0005770805,0.014301403,0.00025347178,0.0078090485],"study_design_scores_gemma":[0.000006709772,0.000028323811,0.00033947467,0.0000045686033,0.000010962029,0.000013298063,0.000022503842,0.9973883,0.00013950434,0.0012999508,0.0007392803,0.0000072024145],"about_ca_topic_score_codex":0.038213864,"about_ca_topic_score_gemma":0.02009885,"teacher_disagreement_score":0.038213864,"about_ca_system_score_codex":0.0018729629,"about_ca_system_score_gemma":0.002385932,"threshold_uncertainty_score":0.07598287},"labels":[],"label_agreement":null},{"id":"W1993849568","doi":"10.1061/(asce)la.1943-4170.0000034","title":"Considering Attitudes in Strategic Negotiation over Brownfield Disputes","year":2010,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Brownfield; Negotiation; Computer science; Order (exchange); Process (computing); Management science; Process management; Negotiation theory; Conflict resolution; Decision support system; Operations research; Risk analysis (engineering); Knowledge management; Business; Engineering; Artificial intelligence; Political science; Civil engineering; Law","score_opus":0.021241602050018134,"score_gpt":0.28054258765775253,"score_spread":0.2593009856077344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993849568","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26620692,0.00030092537,0.70341015,0.0013346142,0.00010090904,0.0003560059,0.000026881207,0.00009048232,0.028173104],"genre_scores_gemma":[0.8911769,0.0001351215,0.10720162,0.00007507495,0.000020206804,0.00015332198,0.000021926457,0.000014603606,0.0012013367],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9855402,0.011545157,0.00048731244,0.0005038461,0.0014713345,0.00045199113],"domain_scores_gemma":[0.974224,0.021509223,0.0017574377,0.0005542171,0.0014503681,0.00050480384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015050311,0.00053959864,0.00039409913,0.002194286,0.0018129563,0.0044942903,0.0012030092,0.0014623099,0.0026726017],"category_scores_gemma":[0.035136793,0.00037845835,0.000675509,0.0018765607,0.004172538,0.006812047,0.002574687,0.0014599082,0.00023730382],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003655136,0.00023863853,0.008430991,0.0003841085,0.000099655575,0.0008866099,0.02765404,0.07002461,0.004596826,0.72650975,0.00098688,0.15982242],"study_design_scores_gemma":[0.00011124356,0.0002985422,0.004826302,0.00019892982,0.000099428915,0.0003705985,0.027857369,0.38849637,0.0041773305,0.5592921,0.014102327,0.00016947546],"about_ca_topic_score_codex":0.0019111462,"about_ca_topic_score_gemma":0.0020851197,"teacher_disagreement_score":0.015050311,"about_ca_system_score_codex":0.0021338896,"about_ca_system_score_gemma":0.0015914206,"threshold_uncertainty_score":0.07959455},"labels":[],"label_agreement":null},{"id":"W1994411146","doi":"10.1115/ipc2012-90259","title":"Enbridge Cost and Schedule Contingency Assessments","year":2012,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Petroleum Technology Alliance Canada; Stantec (Canada)","funders":"","keywords":"Cost contingency; Contingency; Schedule; Computer science; Operations research; Risk analysis (engineering); Contingency plan; Valuation (finance); Guard (computer science); Process (computing); Cost estimate; Business; Engineering; Cost engineering; Systems engineering; Finance; Computer security","score_opus":0.19347076027172558,"score_gpt":0.4579564568247091,"score_spread":0.2644856965529835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1994411146","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.042529956,0.00043796608,0.5774335,0.0017979331,0.0003066923,0.0017215279,0.006316677,0.005448584,0.3640072],"genre_scores_gemma":[0.3222049,0.00074922835,0.5255797,0.00028673062,0.00012661969,0.0009942646,0.008380325,0.0014556302,0.14022247],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9916809,0.0020504878,0.00047102294,0.00049122196,0.00500931,0.00029705217],"domain_scores_gemma":[0.98584557,0.0034181501,0.0008360667,0.002316379,0.007395614,0.0001881988],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00874164,0.0010907188,0.0006359369,0.00576693,0.0014169572,0.0040670983,0.0022688543,0.001117707,0.025873914],"category_scores_gemma":[0.034258872,0.00075578724,0.00063073315,0.0028942712,0.0006357091,0.0039387676,0.0024711522,0.0014650417,0.006433596],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002050985,0.00017711666,0.007216233,0.00023501445,0.00002512367,0.00028585602,0.0013554296,0.16985211,0.002647512,0.1548522,0.09016924,0.57297903],"study_design_scores_gemma":[0.0000502778,0.00025532808,0.011514539,0.0003343787,0.000029968407,0.00035104182,0.0012176132,0.45077828,0.007853981,0.07358085,0.45378962,0.00024414816],"about_ca_topic_score_codex":0.019808836,"about_ca_topic_score_gemma":0.029916354,"teacher_disagreement_score":0.025873914,"about_ca_system_score_codex":0.0036797673,"about_ca_system_score_gemma":0.0045267986,"threshold_uncertainty_score":0.08655691},"labels":[],"label_agreement":null},{"id":"W1994674839","doi":"10.5430/bmr.v4n1p1","title":"Analysis of the Relationship of Maturity and Quality Management in Projects","year":2014,"lang":"en","type":"article","venue":"Business and Management Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Maturity (psychological); Business; Quality (philosophy); Process management; Capability Maturity Model; Project management; Quality management; OPM3; Operations management; Marketing; Knowledge management; Project portfolio management; Computer science; Management; Engineering; Economics; Psychology","score_opus":0.33323353378887716,"score_gpt":0.4770000190098502,"score_spread":0.14376648522097302,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1994674839","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99707043,0.0001596039,0.0012782639,0.00014162308,0.0000022459983,0.000020612275,0.00004426101,0.000005216493,0.0012776715],"genre_scores_gemma":[0.99944574,0.000049785976,0.00034835836,0.0000042338056,0.0000017162741,0.000008268877,0.000039699313,0.0000010035477,0.00010129389],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.995301,0.0023367342,0.0004148788,0.00022124547,0.001248272,0.00047775713],"domain_scores_gemma":[0.9450694,0.030619206,0.01344265,0.0009891248,0.0072575016,0.0026221373],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006664296,0.00015406076,0.00018790901,0.0018843854,0.0003122825,0.0012086113,0.0002523402,0.00039584903,0.0012144442],"category_scores_gemma":[0.04109943,0.0001576637,0.00040074912,0.0019084268,0.00030303263,0.0010390715,0.0007884402,0.000675425,0.00011019082],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000100845195,0.00012824606,0.97692776,0.000037419846,0.00006476684,0.00006564163,0.0011717844,0.0008040959,0.0004324983,0.00071370316,0.000095946205,0.019457228],"study_design_scores_gemma":[0.0000039518195,0.0002254681,0.9931471,0.000032676664,0.000031722117,0.00009738392,0.0016857553,0.0035241207,0.00029300072,0.00038541146,0.00056335,0.000010132222],"about_ca_topic_score_codex":0.002783305,"about_ca_topic_score_gemma":0.0021427302,"teacher_disagreement_score":0.006664296,"about_ca_system_score_codex":0.0010461087,"about_ca_system_score_gemma":0.0011819747,"threshold_uncertainty_score":0.035244584},"labels":[],"label_agreement":null},{"id":"W1995059863","doi":"10.1108/ecam-03-2014-0039","title":"Contingency modelling for construction projects using fuzzy-set theory","year":2015,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":75,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Contingency; Fuzzy set; Set (abstract data type); Originality; Contingency theory; Novelty; Computer science; Contingency management; Operations research; Fuzzy logic; Management science; Engineering; Artificial intelligence; Knowledge management","score_opus":0.15690749292796488,"score_gpt":0.33596171052028806,"score_spread":0.17905421759232318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1995059863","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021408375,0.00029755116,0.97190565,0.00015973844,0.00002926528,0.00007847884,0.000099738456,0.000112749665,0.005908475],"genre_scores_gemma":[0.8420671,0.000592935,0.15271196,0.000042997992,0.000038233648,0.0002719395,0.00018547632,0.000029480783,0.0040598647],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993787,0.00022368957,0.00003699291,0.00007494671,0.00023124035,0.000054376113],"domain_scores_gemma":[0.9992932,0.0004114139,0.00010256026,0.000031332376,0.00012812637,0.000033313245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011184578,0.0006427887,0.00062167895,0.0013336277,0.00066252,0.0015357359,0.001237463,0.00081349834,0.0025506334],"category_scores_gemma":[0.0019841713,0.0003245828,0.0011446844,0.00090835383,0.00059178873,0.0010359293,0.0006564476,0.00091338006,0.00024502559],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000132997375,0.000014937776,0.00066747784,0.000029474077,0.000017682481,0.000058315116,0.00007313558,0.9755948,0.00029944725,0.0136409635,0.0002666513,0.009323806],"study_design_scores_gemma":[0.0000018232826,0.000011118384,0.00017811754,0.000014258777,0.000005949415,0.000017578597,0.000022474065,0.99391264,0.00009570065,0.0052339355,0.0004998077,0.0000064780766],"about_ca_topic_score_codex":0.016191285,"about_ca_topic_score_gemma":0.011720722,"teacher_disagreement_score":0.016191285,"about_ca_system_score_codex":0.0016657867,"about_ca_system_score_gemma":0.0015404123,"threshold_uncertainty_score":0.032194078},"labels":[],"label_agreement":null},{"id":"W1995712371","doi":"10.1016/j.ijproman.2014.06.008","title":"Project-based and temporary organizing: Reconnecting and rediscovering","year":2014,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":27,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Project management; Key (lock); Argument (complex analysis); Management science; Process management; Engineering; Engineering management; Knowledge management; Engineering ethics; Computer science; Systems engineering","score_opus":0.07320449723344426,"score_gpt":0.37031497803181196,"score_spread":0.2971104807983677,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1995712371","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84395635,0.00026811945,0.023305202,0.0007317996,0.00010235075,0.00023180782,0.00004218676,0.00016213224,0.13120009],"genre_scores_gemma":[0.9922043,0.000052714462,0.002395584,0.00003386142,0.000009372983,0.000044605946,0.000026256163,0.000021471225,0.0052119354],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99710137,0.0012683974,0.000095521544,0.00027311468,0.0004364302,0.0008250315],"domain_scores_gemma":[0.9921266,0.002018653,0.0010642121,0.002248187,0.00092144945,0.0016208596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034489988,0.00027237684,0.0003172888,0.0013998742,0.0025652777,0.0033428355,0.0021213708,0.0009086269,0.010112077],"category_scores_gemma":[0.012459083,0.00024189819,0.00056376343,0.0011428327,0.0025430855,0.0021913135,0.0034706544,0.00083252246,0.0010001651],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001259022,0.0014998985,0.08224886,0.0003468345,0.00011236522,0.0014709482,0.027483111,0.01681873,0.0067190374,0.22458988,0.006711798,0.63073945],"study_design_scores_gemma":[0.0002999278,0.0042450363,0.32179022,0.00079986546,0.0003653644,0.0038028045,0.19349286,0.07233443,0.009260326,0.25162196,0.14170969,0.00027752944],"about_ca_topic_score_codex":0.003398624,"about_ca_topic_score_gemma":0.008614061,"teacher_disagreement_score":0.010112077,"about_ca_system_score_codex":0.0013480668,"about_ca_system_score_gemma":0.003032573,"threshold_uncertainty_score":0.03382826},"labels":[],"label_agreement":null},{"id":"W1995732831","doi":"10.4236/ti.2011.22011","title":"Assessing Uncertainty and Risk in Public Sector Investment Projects","year":2011,"lang":"en","type":"article","venue":"Technology and Investment","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Profitability index; Project appraisal; Investment (military); Risk analysis (engineering); Strengths and weaknesses; Public sector; Risk assessment; Risk management; Capital budgeting; Business; Financial risk; Actuarial science; Finance; Computer science; Economics; Political science","score_opus":0.17306999452229443,"score_gpt":0.33784123516026954,"score_spread":0.1647712406379751,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1995732831","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84853303,0.0018297443,0.130188,0.0012637058,0.000030545696,0.0002294861,0.00012741535,0.00005766169,0.017740274],"genre_scores_gemma":[0.9885133,0.0004969942,0.01052844,0.00001660225,0.000016887581,0.00005601331,0.00003062113,0.000006592529,0.00033458255],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98293614,0.012388865,0.0006212731,0.0003351207,0.00317228,0.0005463519],"domain_scores_gemma":[0.83369094,0.15006286,0.008722597,0.0015127975,0.0051358724,0.0008749725],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.025150368,0.0006461633,0.00086966646,0.0037398716,0.00081913045,0.0045188763,0.000667798,0.0011098847,0.0011279334],"category_scores_gemma":[0.09487246,0.00039512763,0.0005884439,0.0026999088,0.002046948,0.0031184114,0.0021068046,0.001072176,0.000112266964],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007584453,0.00015005113,0.07981957,0.00055541773,0.00028233876,0.0008119923,0.0047347755,0.68043524,0.0017383549,0.09377839,0.00097546086,0.13595997],"study_design_scores_gemma":[0.00003638173,0.0007343196,0.061542988,0.0005793071,0.00015560957,0.00055868377,0.010821808,0.6475487,0.0031966928,0.2703973,0.0041801343,0.00024816257],"about_ca_topic_score_codex":0.0027244203,"about_ca_topic_score_gemma":0.003243086,"teacher_disagreement_score":0.025150368,"about_ca_system_score_codex":0.003040112,"about_ca_system_score_gemma":0.0022724723,"threshold_uncertainty_score":0.1330095},"labels":[],"label_agreement":null},{"id":"W1996763716","doi":"10.3917/mav.012.0089","title":"Les membres du Club de Montréal ont-ils influencé la recherche en management de projet ?","year":2007,"lang":"fr","type":"article","venue":"Management & Avenir","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Club; Political science; Art; Medicine","score_opus":0.1849461104246052,"score_gpt":0.41317783621958,"score_spread":0.22823172579497478,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1996763716","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49988446,0.0062605496,0.009663638,0.14201999,0.00068799197,0.00035690458,0.00042962114,0.00015409508,0.3405428],"genre_scores_gemma":[0.95785755,0.0014852155,0.001189639,0.0023876883,0.00011273334,0.00008572939,0.000057443576,0.000033586395,0.03679039],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9830989,0.007650472,0.0002772229,0.0012226562,0.0039582206,0.0037925625],"domain_scores_gemma":[0.97106105,0.008502123,0.00320898,0.0010796626,0.0073000495,0.008848228],"candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.01149146,0.00053937914,0.0005725774,0.0020690854,0.016194642,0.018715702,0.002450502,0.0027682185,0.019989392],"category_scores_gemma":[0.037929002,0.0004897434,0.00035282472,0.0034809557,0.012428051,0.0044488017,0.0055768704,0.00240823,0.0013010764],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028981673,0.0002908326,0.1495279,0.0005089336,0.00017389053,0.0016857056,0.32272238,0.0014958705,0.002665443,0.31262958,0.05694697,0.15106267],"study_design_scores_gemma":[0.000052651267,0.0001968548,0.10355522,0.00097489933,0.000095894735,0.00025246927,0.40756828,0.0016186297,0.00118385,0.019309884,0.46498677,0.00020451337],"about_ca_topic_score_codex":0.68498385,"about_ca_topic_score_gemma":0.8146002,"teacher_disagreement_score":0.98380536,"about_ca_system_score_codex":0.04822288,"about_ca_system_score_gemma":0.04860459,"threshold_uncertainty_score":0.6337427},"labels":[],"label_agreement":null},{"id":"W1997898646","doi":"10.1108/17538371211214932","title":"A typology of unexpected events in complex projects","year":2012,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Typology; Predictability; Event (particle physics); Unexpected events; Affect (linguistics); Epistemology; Dimension (graph theory); Sociology; Cognitive science; Psychology; Engineering; Communication; Systems engineering; Philosophy","score_opus":0.1576376252673749,"score_gpt":0.4081137995086184,"score_spread":0.2504761742412435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1997898646","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78958046,0.0012020147,0.12805766,0.0030119112,0.00024023803,0.0005988476,0.00039472355,0.00026720887,0.07664702],"genre_scores_gemma":[0.9911737,0.00021061694,0.007204081,0.00006276845,0.000031924286,0.00017554927,0.00013895516,0.00002916494,0.00097333733],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9856984,0.008019289,0.0011477831,0.0009303984,0.0032958728,0.0009082743],"domain_scores_gemma":[0.95678526,0.025339786,0.008551713,0.0043214587,0.0032243847,0.0017773489],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005747597,0.0006154461,0.00038678874,0.006587584,0.0043434007,0.007068198,0.0015834227,0.0020386802,0.004040575],"category_scores_gemma":[0.027953401,0.00047420902,0.0008103811,0.005711074,0.007444799,0.0070265583,0.0072966823,0.001806589,0.0003515569],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026689746,0.00022164593,0.15432958,0.0012389995,0.00015080607,0.009322041,0.27813375,0.007552535,0.0034763399,0.43394023,0.0062748883,0.10509228],"study_design_scores_gemma":[0.0000623668,0.00037901627,0.10704183,0.002133378,0.00009079537,0.0104637975,0.39454257,0.02994885,0.0022288698,0.25188866,0.20088273,0.00033708074],"about_ca_topic_score_codex":0.0018309244,"about_ca_topic_score_gemma":0.002135833,"teacher_disagreement_score":0.007068198,"about_ca_system_score_codex":0.0036584383,"about_ca_system_score_gemma":0.0018438455,"threshold_uncertainty_score":0.03039658},"labels":[],"label_agreement":null},{"id":"W1998536527","doi":"10.1108/17538371211214941","title":"Practical difficulties encountered in attempting to implement a partnering approach","year":2012,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Originality; Knowledge management; Process management; Key (lock); Value (mathematics); Computer science; Project management; Empirical research; Management science; Business; Sociology; Management; Engineering; Qualitative research; Economics","score_opus":0.2089811552009794,"score_gpt":0.4547600313545138,"score_spread":0.24577887615353441,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1998536527","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20783302,0.0043134107,0.57374865,0.08770213,0.001898976,0.0032663846,0.00005487616,0.0011111061,0.120071426],"genre_scores_gemma":[0.6860065,0.0019579802,0.29526246,0.005335996,0.00020964404,0.001921139,0.000079010366,0.00019367448,0.009033587],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.7835295,0.16845393,0.008736922,0.005458645,0.026468413,0.007352551],"domain_scores_gemma":[0.8208881,0.104822956,0.012295636,0.021329645,0.029183242,0.01148038],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.15210077,0.0009439578,0.0007802656,0.0016926411,0.010332086,0.012509063,0.005714327,0.0051505896,0.0060530077],"category_scores_gemma":[0.20249201,0.0008593104,0.00073589187,0.0016859752,0.010735786,0.012517613,0.017798044,0.007027999,0.002240366],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014226962,0.00070436805,0.016297773,0.0023492775,0.00009939421,0.0038185087,0.17460625,0.0051915543,0.003842872,0.18515107,0.020348562,0.58744806],"study_design_scores_gemma":[0.000109072265,0.0012595172,0.009698713,0.006076152,0.0000780912,0.008700616,0.413297,0.0129906135,0.0033540102,0.16734034,0.37671793,0.00037808585],"about_ca_topic_score_codex":0.0030402883,"about_ca_topic_score_gemma":0.0028001706,"teacher_disagreement_score":0.15210077,"about_ca_system_score_codex":0.0053780903,"about_ca_system_score_gemma":0.018581346,"threshold_uncertainty_score":0.8043954},"labels":[],"label_agreement":null},{"id":"W1998922408","doi":"10.3846/jcem.2010.60","title":"CAUSES OF VARIATION ORDERS IN CONSTRUCTION PROJECTS IN THE GAZA STRIP","year":2010,"lang":"en","type":"article","venue":"Journal of Civil Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":72,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SAIT Polytechnic","funders":"","keywords":"Variation (astronomy); Spare part; Ranking (information retrieval); Gaza strip; Closure (psychology); Quality (philosophy); Process (computing); Business; Operations management; Order (exchange); Marketing; Engineering; Computer science; Finance; Political science; Palestine","score_opus":0.025521429462801094,"score_gpt":0.28085340223683886,"score_spread":0.25533197277403774,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1998922408","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9924717,0.0026316922,0.00038198452,0.000928426,0.000019453091,0.000039199567,0.00022890182,0.000014517473,0.0032842094],"genre_scores_gemma":[0.99779785,0.0011822542,0.0002535922,0.0000459535,0.00000554822,0.000013563661,0.000107803826,0.0000026961434,0.00059084187],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9966903,0.00094386184,0.00040401227,0.0002736279,0.0011685332,0.0005197395],"domain_scores_gemma":[0.99205244,0.0019799138,0.00436671,0.00017268844,0.0010924967,0.00033577468],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015464025,0.0003638465,0.00022801808,0.0033648964,0.0017638828,0.0018565332,0.00060494314,0.00062250695,0.0026024487],"category_scores_gemma":[0.00501664,0.0004385779,0.0004094123,0.004430687,0.00095271575,0.000782656,0.0012919657,0.0005105839,0.00023172087],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015385028,0.000092840375,0.91074747,0.0009915155,0.000070168004,0.009783071,0.018316485,0.0013038571,0.0021581156,0.0014538185,0.0024761825,0.052452765],"study_design_scores_gemma":[0.000006424527,0.00010530256,0.9291512,0.0003396297,0.00003663884,0.002761125,0.0554544,0.0006783745,0.0006879338,0.00044103788,0.010294386,0.00004354843],"about_ca_topic_score_codex":0.018305866,"about_ca_topic_score_gemma":0.029912798,"teacher_disagreement_score":0.018305866,"about_ca_system_score_codex":0.0027912478,"about_ca_system_score_gemma":0.0032917776,"threshold_uncertainty_score":0.03639865},"labels":[],"label_agreement":null},{"id":"W1999557334","doi":"10.1108/14635770310457520","title":"A multi‐level causal model for best practices in project management","year":2003,"lang":"en","type":"article","venue":"Benchmarking An International Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Lethbridge","funders":"","keywords":"Moderation; Interpersonal communication; Project management; Knowledge management; OPM3; Psychology; Outcome (game theory); Best practice; Causal model; Social skills; Project management triangle; Process management; Conflict management; Computer science; Business; Engineering; Social psychology; Management; Political science; Medicine","score_opus":0.45035442599896564,"score_gpt":0.50109092720211,"score_spread":0.05073650120314438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1999557334","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040260497,0.0005354662,0.91171604,0.009713378,0.00011589371,0.000826547,0.0006119818,0.00046727707,0.03575291],"genre_scores_gemma":[0.6939109,0.0011114622,0.29415426,0.0005936066,0.00012944489,0.0019271027,0.00068213284,0.00009209127,0.007398948],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9878247,0.0067327395,0.0005544872,0.0015765079,0.0025715868,0.0007400323],"domain_scores_gemma":[0.9565147,0.032073632,0.0050420905,0.0017223659,0.0036062782,0.0010408913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01549838,0.0012629757,0.00076997647,0.005828104,0.0024185518,0.0047908407,0.003268468,0.0028286185,0.014688864],"category_scores_gemma":[0.03705525,0.0010857648,0.0015185832,0.0037662562,0.0038973817,0.009085999,0.0031332031,0.0029545915,0.0015095299],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008807993,0.00036316726,0.014554612,0.00031753108,0.00014228978,0.000390936,0.0025693835,0.05502162,0.00034741237,0.8935155,0.0018980122,0.03079139],"study_design_scores_gemma":[0.0002111571,0.00027703846,0.007733292,0.00031968963,0.0002130319,0.0005056437,0.0013214836,0.24694578,0.00038117793,0.72834134,0.013617065,0.00013318361],"about_ca_topic_score_codex":0.010547533,"about_ca_topic_score_gemma":0.008556008,"teacher_disagreement_score":0.01549838,"about_ca_system_score_codex":0.0060223653,"about_ca_system_score_gemma":0.0064668925,"threshold_uncertainty_score":0.081964254},"labels":[],"label_agreement":null},{"id":"W2000586020","doi":"10.1016/j.autcon.2011.04.006","title":"Incorporating rework into construction schedule analysis","year":2011,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":57,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Rework; Schedule; Reliability engineering; Computer science; Operations management; Operations research; Engineering","score_opus":0.08608231913367637,"score_gpt":0.34580600086174007,"score_spread":0.2597236817280637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000586020","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15971503,0.00018352247,0.82912946,0.00014636907,0.00008061866,0.0001913416,0.00014902609,0.0014513774,0.008953196],"genre_scores_gemma":[0.67297024,0.00011927992,0.3226633,0.00002551229,0.000034978282,0.00010276278,0.00024046963,0.00027817354,0.0035652388],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985057,0.0007224574,0.000086012384,0.0001734326,0.00040073338,0.000111613044],"domain_scores_gemma":[0.9899303,0.006482123,0.0008630409,0.0012187635,0.0013631812,0.00014256366],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002212222,0.0007085739,0.0007098879,0.0023897022,0.0006417851,0.001443738,0.0009583082,0.00058166793,0.0036110003],"category_scores_gemma":[0.01552358,0.0006815257,0.0007190679,0.0014900437,0.00042312313,0.0020779488,0.0006609786,0.00088628277,0.000548342],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017017133,0.00021773217,0.012810104,0.00013922849,0.000136999,0.0001793715,0.00051898166,0.6321563,0.0040283566,0.012362417,0.0012175378,0.33606282],"study_design_scores_gemma":[0.000013636943,0.00009792611,0.0049520996,0.00002330423,0.000042225445,0.000047697984,0.00019512449,0.97901857,0.0027805823,0.009842651,0.0029580577,0.000028111528],"about_ca_topic_score_codex":0.017180253,"about_ca_topic_score_gemma":0.025690204,"teacher_disagreement_score":0.017180253,"about_ca_system_score_codex":0.0009443882,"about_ca_system_score_gemma":0.0016914787,"threshold_uncertainty_score":0.034160554},"labels":[],"label_agreement":null},{"id":"W2000734092","doi":"10.1061/(asce)la.1943-4170.0000134","title":"Concurrent Delays in Construction: International Legal Perspective","year":2013,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Apportionment; Damages; Business; Perspective (graphical); Law; Term (time); Breach of contract; Political science; Computer science","score_opus":0.014025661614702641,"score_gpt":0.2745337551130599,"score_spread":0.26050809349835724,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000734092","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018597187,0.04937551,0.017286766,0.023447154,0.00064263295,0.00004450055,0.00007552882,0.000030844185,0.89049983],"genre_scores_gemma":[0.88458353,0.062691875,0.011906368,0.004292555,0.0015411372,0.000113623486,0.00008223032,0.00004649169,0.034742154],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99658763,0.0012001465,0.00021401628,0.0004145796,0.0009904567,0.00059319846],"domain_scores_gemma":[0.9956156,0.0025652957,0.00058364414,0.00026850385,0.0007637621,0.00020318264],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037376247,0.00053983094,0.00035599273,0.005147363,0.004612501,0.010483228,0.0012196673,0.0052922596,0.0053794193],"category_scores_gemma":[0.0048380205,0.00029734973,0.00066083815,0.0052070185,0.015269522,0.007112857,0.0031332057,0.005223613,0.0003949013],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000033045694,0.000012228629,0.00029926133,0.00003798938,0.0000017895529,0.000086062995,0.0009072003,0.00051470415,0.000032903605,0.9901447,0.0013170941,0.006642646],"study_design_scores_gemma":[0.000009938908,0.000086469605,0.0039761933,0.0014007443,0.000032326312,0.0009234902,0.0072296103,0.002971506,0.00043009713,0.51198345,0.47090057,0.000055629196],"about_ca_topic_score_codex":0.02329074,"about_ca_topic_score_gemma":0.017873658,"teacher_disagreement_score":0.02329074,"about_ca_system_score_codex":0.012662582,"about_ca_system_score_gemma":0.008158027,"threshold_uncertainty_score":0.091873825},"labels":[],"label_agreement":null},{"id":"W2001286129","doi":"10.1080/01446193.2012.690883","title":"Risk Management for Design and Construction","year":2012,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Construction engineering; Engineering; Risk management; Risk analysis (engineering); Business; Architectural engineering; Computer science","score_opus":0.06757338119077164,"score_gpt":0.2962281247227335,"score_spread":0.22865474353196188,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2001286129","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026370086,0.04682105,0.8401158,0.022083497,0.0013652949,0.00014224522,0.00020032031,0.00038133212,0.062520444],"genre_scores_gemma":[0.77203107,0.021962037,0.16336647,0.0014307364,0.0021936526,0.0003167475,0.00022251639,0.00016734302,0.0383095],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99645597,0.0016082226,0.00023791018,0.00029517224,0.0012150343,0.0001876143],"domain_scores_gemma":[0.99339044,0.0040484117,0.00073825347,0.0005845504,0.0009909723,0.0002473882],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045949845,0.0013225474,0.0012325001,0.0018913309,0.001380337,0.0044974103,0.0011987671,0.0027074108,0.005293131],"category_scores_gemma":[0.0134125855,0.0005323523,0.00082074077,0.0015564078,0.0031482351,0.0037738052,0.0021045492,0.0025635653,0.00058481825],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040656218,0.00007839083,0.0014762622,0.00035406192,0.000096141026,0.00012832962,0.00050298235,0.07098482,0.00060641725,0.79087543,0.008800911,0.12605564],"study_design_scores_gemma":[0.000008588679,0.000047364043,0.00073302636,0.0001886418,0.000031087995,0.00006697835,0.0002539855,0.05676526,0.00028100872,0.92071635,0.020875365,0.00003229177],"about_ca_topic_score_codex":0.005109907,"about_ca_topic_score_gemma":0.004720107,"teacher_disagreement_score":0.005293131,"about_ca_system_score_codex":0.0037861299,"about_ca_system_score_gemma":0.003539312,"threshold_uncertainty_score":0.02747041},"labels":[],"label_agreement":null},{"id":"W2001291551","doi":"10.1007/s10726-012-9290-x","title":"The Yonmenkaigi System Method: An Implementation-Oriented Group Decision Support Approach","year":2012,"lang":"en","type":"article","venue":"Group Decision and Negotiation","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":30,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Decision support system; Computer science; Group (periodic table); Group decision-making; Process management; Software engineering; Data mining; Business; Psychology; Chemistry","score_opus":0.055222717475924644,"score_gpt":0.39366215266636356,"score_spread":0.3384394351904389,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2001291551","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0072105783,0.00006439752,0.98677886,0.00009213283,0.000030929612,0.00027410098,0.00006173136,0.0004252126,0.005061964],"genre_scores_gemma":[0.09425867,0.00013155003,0.9017038,0.000037669342,0.00001985192,0.00093242916,0.00010645538,0.00008817595,0.0027214605],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99656314,0.0023351423,0.00011864797,0.00023397365,0.0006118904,0.00013708114],"domain_scores_gemma":[0.9974201,0.0019207015,0.000108762746,0.00013139237,0.00036268635,0.000056345034],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038290627,0.00088618475,0.0012383637,0.0019288576,0.0011280914,0.0022327248,0.0016463569,0.0011449165,0.009920355],"category_scores_gemma":[0.0072594164,0.0005594637,0.0008711759,0.0020305242,0.000941612,0.0017769446,0.0017696789,0.001405664,0.001248588],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000521941,0.0004899478,0.0033256342,0.0008838565,0.00038928015,0.00016679827,0.0021799519,0.1117888,0.005915061,0.26890826,0.0035668858,0.6018636],"study_design_scores_gemma":[0.00023075941,0.00044594446,0.0011836501,0.00014539178,0.00022812709,0.00010455093,0.0005786477,0.9069798,0.0031673172,0.06918232,0.01765532,0.00009820049],"about_ca_topic_score_codex":0.003978136,"about_ca_topic_score_gemma":0.0048376946,"teacher_disagreement_score":0.009920355,"about_ca_system_score_codex":0.0009772507,"about_ca_system_score_gemma":0.0033776958,"threshold_uncertainty_score":0.033186913},"labels":[],"label_agreement":null},{"id":"W2001451547","doi":"10.1108/17538371211214923","title":"The paradox of risk management; a project management practice perspective","year":2012,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":82,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; Université du Québec à Montréal","funders":"","keywords":"Risk management; Project risk management; Risk management plan; Originality; Perspective (graphical); Set (abstract data type); Risk analysis (engineering); Project management; Empirical research; Computer science; Knowledge management; IT risk management; Project management triangle; Management science; Business; Sociology; Engineering; Qualitative research; Management; Economics","score_opus":0.058281951719032485,"score_gpt":0.4042497944480273,"score_spread":0.3459678427289948,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2001451547","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5238837,0.013572924,0.15278052,0.12712122,0.0004118534,0.00032243365,0.00008108792,0.00012537326,0.18170089],"genre_scores_gemma":[0.99069715,0.0012839977,0.006177203,0.0008029457,0.00006324281,0.000108641805,0.000007241789,0.000014547262,0.0008450163],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9071789,0.07505811,0.002488039,0.0033729589,0.01006415,0.0018378815],"domain_scores_gemma":[0.86294836,0.10695236,0.0129659185,0.006451111,0.0074213673,0.0032608458],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.044612546,0.0005745871,0.00077261846,0.0043377043,0.0048683966,0.015053166,0.0026912228,0.0035833542,0.003487976],"category_scores_gemma":[0.0899341,0.0005347191,0.00038935823,0.0051172674,0.037658855,0.017545316,0.011082927,0.005452907,0.00035039615],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008457775,0.00021094517,0.008501002,0.0006434901,0.000044269083,0.0008317166,0.15381697,0.0034675836,0.00044564647,0.77194524,0.002075538,0.057933085],"study_design_scores_gemma":[0.000042514494,0.00022677088,0.0053085224,0.0013169553,0.000022580267,0.0010525896,0.19992444,0.008290569,0.0005723082,0.73447686,0.048684288,0.000081590195],"about_ca_topic_score_codex":0.002047557,"about_ca_topic_score_gemma":0.0010500007,"teacher_disagreement_score":0.044612546,"about_ca_system_score_codex":0.0072341952,"about_ca_system_score_gemma":0.010479174,"threshold_uncertainty_score":0.23593646},"labels":[],"label_agreement":null},{"id":"W2003080771","doi":"10.1108/02656711011009281","title":"Avoiding rework in product design: evidence from the aerospace industry","year":2010,"lang":"en","type":"article","venue":"International Journal of Quality & Reliability Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Context (archaeology); Originality; New product development; Product design; Engineering design process; Engineering; Product (mathematics); Process management; Aerospace; Marketing; Knowledge management; Operations management; Business; Qualitative research; Computer science","score_opus":0.20625512515387884,"score_gpt":0.45755835365500047,"score_spread":0.25130322850112163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2003080771","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9886594,0.0026828782,0.0008972545,0.00037214166,0.000013578962,0.000055339562,0.000011492443,0.000009270792,0.0072984966],"genre_scores_gemma":[0.99669206,0.0015628904,0.0009597605,0.00015237254,0.000010288163,0.000031727875,0.000015862173,0.000011912121,0.0005630509],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9564572,0.026687363,0.0027371505,0.0028672444,0.009479574,0.0017714421],"domain_scores_gemma":[0.5893079,0.32803082,0.04370531,0.016396208,0.019015435,0.0035442566],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.036127355,0.0004723483,0.000513063,0.0028732836,0.0033251292,0.005380297,0.0023504402,0.001953826,0.003115103],"category_scores_gemma":[0.14499754,0.0008738676,0.00038637233,0.0027994928,0.0054788617,0.0029563732,0.0033726129,0.001573784,0.0005895408],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00074390165,0.0021001936,0.26262748,0.0049880077,0.00022738914,0.0016287339,0.46227875,0.00069135847,0.0023368504,0.0023851914,0.0011318908,0.25886023],"study_design_scores_gemma":[0.000103849314,0.0031758214,0.5271282,0.0036700831,0.00016663456,0.0021252392,0.42535862,0.0008872408,0.0027870825,0.0010078942,0.03347885,0.00011051192],"about_ca_topic_score_codex":0.004883547,"about_ca_topic_score_gemma":0.007244871,"teacher_disagreement_score":0.036127355,"about_ca_system_score_codex":0.0025677227,"about_ca_system_score_gemma":0.003956093,"threshold_uncertainty_score":0.19106203},"labels":[],"label_agreement":null},{"id":"W2004340890","doi":"10.1504/ijpom.2010.033659","title":"A matrix for monitoring the strategic performance of project portfolios","year":2010,"lang":"en","type":"article","venue":"International Journal of Project Organisation and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Project management; Process management; Systems engineering; Computer science; Engineering; Business","score_opus":0.08624638322089305,"score_gpt":0.40613316587007625,"score_spread":0.3198867826491832,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2004340890","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14294417,0.00053444755,0.82193077,0.0003755764,0.00015504411,0.0008688461,0.00492642,0.00636068,0.021904066],"genre_scores_gemma":[0.302916,0.00029583924,0.6898194,0.00002844373,0.00004654504,0.0005998692,0.0025053746,0.00020656119,0.0035820063],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99411315,0.0013069792,0.00063391717,0.0005297814,0.0032459449,0.00017031102],"domain_scores_gemma":[0.98655105,0.005080591,0.0022334494,0.0011301697,0.0044857142,0.00051900564],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031808591,0.0009891089,0.0006053252,0.008567986,0.0007757672,0.0029763838,0.00072738185,0.0005862989,0.005406869],"category_scores_gemma":[0.016751008,0.00034456942,0.0003427222,0.005161545,0.00044964344,0.0024889887,0.0012897323,0.0006369769,0.0018432278],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006096654,0.00028862082,0.04396225,0.0005697252,0.00013274905,0.00029171264,0.002078853,0.021801598,0.038353547,0.02225241,0.008496891,0.86116207],"study_design_scores_gemma":[0.00016599723,0.003014783,0.14137477,0.00073230866,0.00033682003,0.0022438928,0.004263576,0.5231342,0.12485698,0.043510694,0.15561518,0.00075080886],"about_ca_topic_score_codex":0.002105615,"about_ca_topic_score_gemma":0.0023026757,"teacher_disagreement_score":0.008567986,"about_ca_system_score_codex":0.0007935631,"about_ca_system_score_gemma":0.0010580352,"threshold_uncertainty_score":0.018087745},"labels":[],"label_agreement":null},{"id":"W2004359089","doi":"10.1139/l04-118","title":"A reasoning process in support of integrated project control","year":2005,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Process (computing); Resource (disambiguation); Fuzzy logic; Set (abstract data type); Relation (database); Control (management); Object (grammar); Key (lock); Software engineering; Artificial intelligence; Data mining; Computer security","score_opus":0.023755404177631015,"score_gpt":0.28752496644245995,"score_spread":0.26376956226482895,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2004359089","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007597171,0.00007006661,0.98778695,0.0002637773,0.000019727662,0.00016240282,0.00003713797,0.001451236,0.002611545],"genre_scores_gemma":[0.17589594,0.00011093049,0.8218324,0.000101175734,0.00003967978,0.00019860982,0.00016675315,0.000077453406,0.0015770664],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9908915,0.0035577775,0.0007872837,0.0015938034,0.0027800282,0.0003895635],"domain_scores_gemma":[0.9815625,0.013146423,0.0010864283,0.0017391425,0.0021016158,0.0003637932],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01340933,0.0010216278,0.0008723626,0.002523279,0.0018774817,0.0044866186,0.0026512598,0.0019741077,0.0039848504],"category_scores_gemma":[0.028252583,0.0006073166,0.0011908436,0.0015151442,0.0030581017,0.0054053413,0.0024823062,0.0019323207,0.00092072977],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008864977,0.0007043962,0.0036539503,0.0006822856,0.0001839586,0.0018917968,0.01151157,0.11790364,0.021428812,0.30257744,0.0041142143,0.5344615],"study_design_scores_gemma":[0.00031664214,0.0003910954,0.0009972953,0.0003023144,0.00024091221,0.00090593274,0.0011282809,0.7360945,0.026714828,0.19071837,0.04201947,0.0001703966],"about_ca_topic_score_codex":0.0040963,"about_ca_topic_score_gemma":0.0016487098,"teacher_disagreement_score":0.01340933,"about_ca_system_score_codex":0.0012290606,"about_ca_system_score_gemma":0.0032840096,"threshold_uncertainty_score":0.070916176},"labels":[],"label_agreement":null},{"id":"W2004487321","doi":"10.1016/s0263-7863(00)00042-9","title":"Working towards best practices in project management","year":2002,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":116,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Lethbridge","funders":"Social Sciences and Humanities Research Council of Canada; Institute for Humanities Research, Arizona State University","keywords":"Best practice; Context (archaeology); Business; Sample (material); Organizational culture; OPM3; Knowledge management; Public relations; Project management; Management; Program management; Political science; Computer science; Geography","score_opus":0.32295841071839027,"score_gpt":0.45998856605503546,"score_spread":0.1370301553366452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2004487321","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07271531,0.019308576,0.27119038,0.5334573,0.0032305587,0.00071882503,0.0001055793,0.0011084435,0.09816505],"genre_scores_gemma":[0.46335378,0.013620961,0.49587867,0.016445631,0.00061508117,0.00082688604,0.00028346042,0.0004329979,0.008542456],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.79666877,0.10685209,0.014534734,0.007974622,0.065200895,0.008768877],"domain_scores_gemma":[0.711033,0.12329224,0.022636998,0.045589916,0.07861887,0.018829046],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.18025874,0.0017805166,0.0017076985,0.009274329,0.009322864,0.04437846,0.0085111745,0.014295568,0.0031423757],"category_scores_gemma":[0.18520342,0.0017127832,0.0014206343,0.008611329,0.019304438,0.036073763,0.015424342,0.016609557,0.0017383512],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010961465,0.0014738699,0.010341808,0.002537346,0.00034946867,0.0006616967,0.055134635,0.0065612146,0.0027099878,0.1911057,0.040460315,0.6885544],"study_design_scores_gemma":[0.00014098822,0.00049820094,0.009680073,0.016432576,0.00027796443,0.0008242587,0.106634624,0.007436341,0.0076122712,0.6096137,0.24049345,0.00035549072],"about_ca_topic_score_codex":0.009610282,"about_ca_topic_score_gemma":0.0118842255,"teacher_disagreement_score":0.18025874,"about_ca_system_score_codex":0.014550121,"about_ca_system_score_gemma":0.055791143,"threshold_uncertainty_score":0.9533107},"labels":[],"label_agreement":null},{"id":"W2005002357","doi":"10.5539/jsd.v4n4p175","title":"Determinants of Unethical Performance in Nigerian Construction Industry","year":2011,"lang":"en","type":"article","venue":"Journal of Sustainable Development","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":68,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Language change; Corrupt practices; Abandonment (legal); Quality (philosophy); Business; Stakeholder; Corporate governance; Legislation; Order (exchange); Construction industry; Casual; Economics; Public relations; Political science; Finance; Politics; Law; Engineering","score_opus":0.07234085773463204,"score_gpt":0.32264945074550677,"score_spread":0.2503085930108747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005002357","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99711347,0.00018469956,0.00007718986,0.00043048456,0.0000038136775,0.000018713634,0.000024121351,0.0000011726062,0.002146393],"genre_scores_gemma":[0.99936265,0.00019648562,0.00005285904,0.000019455621,0.000002462142,0.00000504928,0.000013821043,9.0203883e-7,0.00034618378],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99816483,0.00053606357,0.00018485905,0.00009450739,0.0005583517,0.00046137103],"domain_scores_gemma":[0.9858348,0.003404209,0.0071084043,0.00035919898,0.0017142562,0.0015791648],"candidate_categories":["research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0014479078,0.00021374198,0.00019833127,0.0013307167,0.0015123319,0.0016471831,0.0003724278,0.0006535156,0.0038148907],"category_scores_gemma":[0.0069846893,0.0002372891,0.00023764887,0.0010109657,0.0013416545,0.00056127383,0.0012500326,0.0012190447,0.00031223934],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018463323,0.00018801024,0.9898351,0.000041929998,0.000010319953,0.00046900962,0.0033663115,0.00020546583,0.00021598981,0.0004557111,0.00021818806,0.004975523],"study_design_scores_gemma":[0.0000013556845,0.00006681118,0.9809059,0.00014447243,0.0000066232765,0.00028872353,0.01635703,0.00061440375,0.00011923018,0.00023989954,0.0012450342,0.000010495974],"about_ca_topic_score_codex":0.012370774,"about_ca_topic_score_gemma":0.018337749,"teacher_disagreement_score":0.9993465,"about_ca_system_score_codex":0.0014588194,"about_ca_system_score_gemma":0.0024852217,"threshold_uncertainty_score":0.024597526},"labels":[],"label_agreement":null},{"id":"W2005231392","doi":"10.1139/l02-100","title":"Regular papers / Articles ordinairesReceiver operating characteristic (ROC) curve analysis of the effectiveness of construction planning efforts in Australia and the United Kingdom","year":2003,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Receiver operating characteristic; Operations research; Sample (material); Variable (mathematics); Computer science; Engineering; Mathematics; Machine learning","score_opus":0.035053182009028475,"score_gpt":0.2756610732609316,"score_spread":0.24060789125190313,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005231392","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5001848,0.13313445,0.051958997,0.029723514,0.031911384,0.0029118392,0.020856027,0.0023269225,0.22699212],"genre_scores_gemma":[0.73739636,0.06436086,0.048107494,0.0035950951,0.015578094,0.001379294,0.02353523,0.0019603777,0.10408722],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.98179996,0.004591175,0.0016740004,0.0008870025,0.010525022,0.0005228481],"domain_scores_gemma":[0.90294904,0.046196163,0.009616994,0.0043558776,0.033652734,0.0032291883],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015046479,0.0006456742,0.0012944642,0.01009884,0.00071347744,0.004489269,0.00088835496,0.0010277408,0.024468087],"category_scores_gemma":[0.11507766,0.00041138567,0.00093385286,0.009704401,0.0010204668,0.0016155004,0.0007222704,0.00082948094,0.007814221],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017984792,0.00046645312,0.12378444,0.0023464726,0.00045498728,0.00067399384,0.0006747704,0.0028032544,0.0015746233,0.0033439847,0.22491658,0.637162],"study_design_scores_gemma":[0.00031046034,0.0019313542,0.43687287,0.003237883,0.00044241233,0.003395446,0.0018893755,0.010033615,0.0061416985,0.005564868,0.5299315,0.00024863417],"about_ca_topic_score_codex":0.005330569,"about_ca_topic_score_gemma":0.0042568883,"teacher_disagreement_score":0.024468087,"about_ca_system_score_codex":0.002272336,"about_ca_system_score_gemma":0.0023460288,"threshold_uncertainty_score":0.081853926},"labels":[],"label_agreement":null},{"id":"W2006779601","doi":"10.1108/00197850810886469","title":"Performance evaluation in a matrix organization: a case study (Part One)","year":2008,"lang":"en","type":"article","venue":"Industrial and Commercial Training","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CAE (Canada); Concordia University","funders":"","keywords":"Constructive; Order (exchange); Process management; Computer science; Matrix (chemical analysis); Knowledge management; Business; Process (computing)","score_opus":0.5867674719408857,"score_gpt":0.415611347196609,"score_spread":0.17115612474427672,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2006779601","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98765635,0.0002499448,0.0040830146,0.0011118511,0.000050763054,0.00041172674,0.000028744049,0.000033217457,0.0063744285],"genre_scores_gemma":[0.98886555,0.00031318248,0.006319857,0.00019781674,0.00003074375,0.0001919016,0.000020456233,0.000024253348,0.004036316],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9930258,0.004693397,0.00018286897,0.00042288256,0.0008490368,0.0008261009],"domain_scores_gemma":[0.9904743,0.004277355,0.0011610076,0.00059922773,0.0012027955,0.0022853331],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0063414057,0.0005570963,0.00034516928,0.0012009168,0.0068218936,0.0038629288,0.0013828152,0.0023135098,0.0028642116],"category_scores_gemma":[0.011682203,0.00035497267,0.0004566712,0.00088372856,0.0028091364,0.0016451307,0.0025136156,0.002032185,0.0006262861],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015094904,0.020413011,0.095331036,0.0012307356,0.000099226374,0.069310024,0.50216764,0.0054227114,0.013634873,0.018284617,0.012241758,0.2603549],"study_design_scores_gemma":[0.00023124147,0.018396461,0.09138919,0.00093427603,0.00008647029,0.029801413,0.7498584,0.014326505,0.014058827,0.0040332503,0.07658594,0.0002980228],"about_ca_topic_score_codex":0.004673626,"about_ca_topic_score_gemma":0.010434416,"teacher_disagreement_score":0.0068218936,"about_ca_system_score_codex":0.0038419052,"about_ca_system_score_gemma":0.0027524163,"threshold_uncertainty_score":0.03353697},"labels":[],"label_agreement":null},{"id":"W2007060615","doi":"10.4043/17411-ms","title":"Small Projects-Fertile Ground for Large Project Savings","year":2005,"lang":"en","type":"article","venue":"Offshore Technology Conference","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"ConocoPhillips (Canada)","funders":"","keywords":"Citation; Download; Project management; Computer science; Project manager; Engineering management; Engineering; World Wide Web; Systems engineering","score_opus":0.15097968855699315,"score_gpt":0.36219565778970103,"score_spread":0.21121596923270788,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2007060615","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.285206,0.0028417103,0.056904912,0.05788908,0.0011903308,0.0012720469,0.0007063663,0.0019953195,0.5919943],"genre_scores_gemma":[0.8797285,0.0013852542,0.021485401,0.0020442507,0.00030217224,0.0003905914,0.0005064582,0.00047972135,0.093677685],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.990973,0.003787974,0.00026979367,0.0005231523,0.0032833554,0.0011626466],"domain_scores_gemma":[0.9811655,0.003835791,0.0018657632,0.0025363863,0.004396511,0.0061998814],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0073629636,0.0005971054,0.00030800197,0.0016551622,0.0019447198,0.007568608,0.0016474929,0.0010076397,0.04890635],"category_scores_gemma":[0.014789632,0.00033803598,0.00039151497,0.0012528105,0.0016472811,0.0044770897,0.009073377,0.0017834659,0.005779148],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033356965,0.00095550675,0.019955264,0.00047850233,0.00004496144,0.0009188033,0.0022957535,0.0029457668,0.0028738864,0.15114835,0.1266,0.69144976],"study_design_scores_gemma":[0.00013402366,0.0012607197,0.053011686,0.0012728345,0.000038017613,0.00093608396,0.010827102,0.003437276,0.0027000054,0.0832987,0.8430018,0.00008181326],"about_ca_topic_score_codex":0.0016422035,"about_ca_topic_score_gemma":0.003118198,"teacher_disagreement_score":0.04890635,"about_ca_system_score_codex":0.0028826897,"about_ca_system_score_gemma":0.009228202,"threshold_uncertainty_score":0.16360807},"labels":[],"label_agreement":null},{"id":"W2008852537","doi":"10.1139/l09-152","title":"Comparison of experienced and novice cost estimator behaviors in information pull and push methods","year":2010,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Estimator; Computer science; Production (economics); Analogy; Structuring; Operations research; Cost estimate; Statistics; Engineering; Mathematics; Economics; Systems engineering","score_opus":0.04181705496212167,"score_gpt":0.38496904262087184,"score_spread":0.34315198765875016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2008852537","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.996896,0.000037535527,0.002453594,0.000018511622,0.0000038101894,0.000026354768,0.0000145362865,0.0000216299,0.000528043],"genre_scores_gemma":[0.9944027,0.000060227456,0.0045069368,0.000043167387,0.0000051268385,0.000053451316,0.00009150318,0.000015445903,0.000821457],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99616504,0.0018013745,0.00044054535,0.00052953645,0.0007595705,0.0003039112],"domain_scores_gemma":[0.9405885,0.04526294,0.0041361325,0.0034804991,0.0031943608,0.003337642],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006679544,0.0005627236,0.00049490033,0.00083813875,0.00022333437,0.0013929582,0.0006369966,0.0007025516,0.0011649694],"category_scores_gemma":[0.04941512,0.00034559058,0.0003388384,0.0002855046,0.00059327856,0.0011484338,0.0013079086,0.00076243014,0.00031821427],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0050898436,0.004843654,0.7333571,0.0006116897,0.0004003743,0.0007692235,0.019875528,0.013465964,0.03633735,0.0009693116,0.0009233773,0.18335667],"study_design_scores_gemma":[0.00054112653,0.018457856,0.80642354,0.00020980841,0.00025641578,0.0011298326,0.016030505,0.121885695,0.027460067,0.002035517,0.0052144723,0.00035527462],"about_ca_topic_score_codex":0.00074167654,"about_ca_topic_score_gemma":0.0010391675,"teacher_disagreement_score":0.006679544,"about_ca_system_score_codex":0.00036356598,"about_ca_system_score_gemma":0.00027190772,"threshold_uncertainty_score":0.03532523},"labels":[],"label_agreement":null},{"id":"W2009237673","doi":"10.1108/17538370910930563","title":"The contribution of the project management office to organisational performance","year":2009,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; Université du Québec à Montréal","funders":"","keywords":"Originality; Sociology; Context (archaeology); Knowledge management; Project management; Value (mathematics); Engineering ethics; Process management; Epistemology; Management; Qualitative research; Business; Computer science; Engineering; Social science","score_opus":0.04005184947308634,"score_gpt":0.34587903336373904,"score_spread":0.3058271838906527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2009237673","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46657225,0.01242291,0.010902823,0.073613346,0.0022359397,0.00019844763,0.00014030021,0.0002874006,0.43362656],"genre_scores_gemma":[0.9916078,0.0016424772,0.0012065194,0.00062598416,0.0004172181,0.000037426857,0.000029514333,0.00006948762,0.0043637],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9392819,0.037875786,0.0017377103,0.0025662133,0.013064137,0.0054743737],"domain_scores_gemma":[0.9105038,0.038029727,0.014089837,0.0047703087,0.011948627,0.020657754],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.027435947,0.000465208,0.0005475346,0.002719177,0.006899119,0.02542087,0.0014618754,0.001520436,0.0056319875],"category_scores_gemma":[0.0634852,0.00026791162,0.0002823378,0.00363768,0.013360641,0.008347426,0.01147864,0.0031809078,0.0013309986],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045191907,0.0003734526,0.047889873,0.0013454081,0.00021058942,0.00061347615,0.07825509,0.0027775636,0.0010306855,0.24506171,0.044527996,0.57746214],"study_design_scores_gemma":[0.00011154657,0.0009772157,0.10637039,0.0023973945,0.00010702937,0.0008105178,0.20139621,0.0030516651,0.0015491856,0.15283547,0.53012705,0.0002663223],"about_ca_topic_score_codex":0.003430181,"about_ca_topic_score_gemma":0.0019718993,"teacher_disagreement_score":0.027435947,"about_ca_system_score_codex":0.006155141,"about_ca_system_score_gemma":0.018248163,"threshold_uncertainty_score":0.1450969},"labels":[],"label_agreement":null},{"id":"W2009383502","doi":"10.1111/j.1541-1338.2002.tb00265.x","title":"TRANSPORTATION AT THE MILLENNIUM: In Search of a Megaproject Lens","year":2002,"lang":"en","type":"article","venue":"Review of Policy Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Public Works and Government Services Canada","funders":"","keywords":"Megaproject; Activity-based costing; Context (archaeology); Profiling (computer programming); Task (project management); Regional science; Business; Economics; Computer science; Marketing; Sociology; Geography; Management; Archaeology","score_opus":0.45010860330191493,"score_gpt":0.5330628042613572,"score_spread":0.08295420095944228,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2009383502","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.052842524,0.34635302,0.024184851,0.3929245,0.0033345518,0.000066133434,0.0007292467,0.000099815086,0.17946531],"genre_scores_gemma":[0.7099376,0.23970516,0.014017969,0.016864786,0.0025474709,0.000280989,0.0003214944,0.00010353731,0.016221002],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99734664,0.0018923351,0.00008522355,0.00014838991,0.00040803707,0.0001192757],"domain_scores_gemma":[0.9953738,0.0022973465,0.00051501615,0.00021076038,0.0011082174,0.0004948684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0048191426,0.00048676576,0.0004261989,0.008831876,0.0019310004,0.009691785,0.0011431337,0.0019000075,0.005603444],"category_scores_gemma":[0.0073169675,0.00030294913,0.00027077924,0.009451612,0.0059640277,0.0108870715,0.003764657,0.0037470954,0.0003850673],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018952442,0.000019113517,0.0019868128,0.00039718352,0.000020968202,0.000115623,0.0030654976,0.0007911468,0.00007778694,0.9222483,0.025301557,0.045956988],"study_design_scores_gemma":[0.000009196467,0.000054168035,0.011346865,0.0028462077,0.000038851882,0.00022070133,0.03019613,0.0015474628,0.00015207427,0.33932725,0.6142283,0.000032823067],"about_ca_topic_score_codex":0.013120401,"about_ca_topic_score_gemma":0.02658534,"teacher_disagreement_score":0.013120401,"about_ca_system_score_codex":0.009456506,"about_ca_system_score_gemma":0.0055075735,"threshold_uncertainty_score":0.06861204},"labels":[],"label_agreement":null},{"id":"W2009536555","doi":"10.2495/safe-v2-n2-131-144","title":"An expert tool for integrating safety into project management","year":2012,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Occupational safety and health; Engineering; Computer science; Risk analysis (engineering); Systems engineering; Process management; Medicine","score_opus":0.028843804445086833,"score_gpt":0.35288644622584847,"score_spread":0.32404264178076164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2009536555","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0055677337,0.00006114189,0.9643239,0.0003698145,0.000041251064,0.0005446001,0.00051622826,0.017056352,0.011518885],"genre_scores_gemma":[0.02812481,0.000090035996,0.96167684,0.00015992072,0.000020812438,0.0003715583,0.00084006455,0.00070279976,0.008013121],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9959382,0.0015706425,0.0004745576,0.00051566167,0.0013002041,0.00020082155],"domain_scores_gemma":[0.9806811,0.012992235,0.0007235437,0.0023081284,0.0028531796,0.0004417517],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007710029,0.0013361864,0.00072900817,0.0042251186,0.0007819765,0.0022232938,0.0020619358,0.0016168522,0.015971355],"category_scores_gemma":[0.019640643,0.00087789434,0.00075500837,0.0015855001,0.0006652498,0.0034025463,0.0027266834,0.0016124876,0.0059429873],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026919134,0.0005698457,0.002659726,0.0008677102,0.00005565566,0.00076153385,0.00513784,0.016226536,0.020562926,0.03671565,0.039249804,0.8769237],"study_design_scores_gemma":[0.00039093773,0.00047549012,0.003995448,0.0010514818,0.00014492849,0.0019744262,0.0021491838,0.26281905,0.032013416,0.07176227,0.62292755,0.0002958781],"about_ca_topic_score_codex":0.0018915794,"about_ca_topic_score_gemma":0.003353962,"teacher_disagreement_score":0.015971355,"about_ca_system_score_codex":0.0010492057,"about_ca_system_score_gemma":0.0027059026,"threshold_uncertainty_score":0.053429544},"labels":[],"label_agreement":null},{"id":"W2010326150","doi":"10.3141/1907-04","title":"Forecasting Payments Made Under Construction Contracts: Payout Curves and Cash Management in the North Carolina Department of Transportation","year":2005,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Victoria General Hospital","funders":"","keywords":"Payment; Pace; Cash flow; Cash; Cash flow forecasting; Finance; Work (physics); Construction management; Business; Actuarial science; Economics; Operations management; Operations research; Engineering; Civil engineering","score_opus":0.18537625703998484,"score_gpt":0.4195573644251342,"score_spread":0.23418110738514936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2010326150","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99296653,0.00009006002,0.003055457,0.00043877942,0.0000101525575,0.000033481134,0.0010585425,0.00008262591,0.0022643053],"genre_scores_gemma":[0.99168044,0.00013311912,0.004106273,0.000039335642,0.000011923263,0.000035257217,0.0024733548,0.000025974514,0.0014942214],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99837154,0.0005166402,0.00008043911,0.00027798547,0.0005487236,0.00020466991],"domain_scores_gemma":[0.9843279,0.007873045,0.0023771056,0.0006230027,0.0040481417,0.00075082143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033320026,0.000560695,0.00027800765,0.003027216,0.0006273803,0.0016893824,0.0011798077,0.0007688371,0.0008910695],"category_scores_gemma":[0.016142676,0.00038812828,0.00052261475,0.0040994426,0.00036969373,0.0011290336,0.000624365,0.00091073266,0.00027331954],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016680543,0.00020008502,0.828899,0.00003178632,0.00008931697,0.00021887156,0.0009768641,0.12432856,0.00039995814,0.0015668465,0.0070304372,0.03609145],"study_design_scores_gemma":[0.000009421578,0.00006529876,0.5172755,0.000050647035,0.000026569576,0.00004645728,0.001671999,0.47651085,0.00041985887,0.00074043835,0.003137708,0.00004523587],"about_ca_topic_score_codex":0.46189284,"about_ca_topic_score_gemma":0.43817866,"teacher_disagreement_score":0.46189284,"about_ca_system_score_codex":0.006376268,"about_ca_system_score_gemma":0.0035324371,"threshold_uncertainty_score":0.91840863},"labels":[],"label_agreement":null},{"id":"W2010339185","doi":"10.1139/l08-035","title":"Dynamic risk analysis in construction projects","year":2008,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":42,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Risk analysis (engineering); Computer science; Set (abstract data type); Bridge (graph theory); Risk assessment; Risk management","score_opus":0.02580974523137321,"score_gpt":0.2559300171310481,"score_spread":0.2301202718996749,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2010339185","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28230923,0.0015724789,0.6825117,0.00086218776,0.000052434483,0.00018455496,0.00018469334,0.00017811045,0.03214462],"genre_scores_gemma":[0.9785123,0.00065498456,0.017863061,0.00002088947,0.00001388356,0.00010895633,0.00006657109,0.000019416166,0.0027399366],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.998642,0.0006927131,0.000045646306,0.00010830328,0.00040267917,0.0001085853],"domain_scores_gemma":[0.99862885,0.00087648444,0.00017629727,0.000048084414,0.00021531533,0.000054943255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001835846,0.00058792194,0.00045288017,0.001341185,0.0005459207,0.0018267054,0.00059476105,0.00080381584,0.0017063171],"category_scores_gemma":[0.0039478475,0.0003532533,0.00049610354,0.0010569929,0.0009396408,0.0012679157,0.0011973395,0.0005495012,0.00014678888],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024788409,0.00002015472,0.001996591,0.000029112747,0.000022137316,0.00013738434,0.00012818775,0.94854397,0.0006140708,0.034827787,0.0003354681,0.013320288],"study_design_scores_gemma":[0.0000069395896,0.00003990074,0.0012679384,0.000021417314,0.000013720995,0.000066550754,0.00022658295,0.95664996,0.00031123502,0.03949973,0.0018790722,0.000016964996],"about_ca_topic_score_codex":0.0096280845,"about_ca_topic_score_gemma":0.0047108848,"teacher_disagreement_score":0.0096280845,"about_ca_system_score_codex":0.0016952858,"about_ca_system_score_gemma":0.0017025103,"threshold_uncertainty_score":0.019144118},"labels":[],"label_agreement":null},{"id":"W2010594683","doi":"10.3850/978-981-08-7920-4_s1-cp03-cd","title":"A Theoretical Framework for Prediction of the Impact of Design Changes on Engineering Effectiveness in Construction Projects","year":2011,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Systems engineering; Construction engineering; Engineering","score_opus":0.13764263793410406,"score_gpt":0.3555506880751969,"score_spread":0.21790805014109285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2010594683","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4989018,0.000722177,0.45524606,0.004464141,0.000104511324,0.00032235702,0.000514889,0.00034535935,0.039378636],"genre_scores_gemma":[0.9862385,0.00015859357,0.012813766,0.000059543698,0.000025249443,0.00013091015,0.00007790686,0.0000102826025,0.00048536708],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.996387,0.0018680036,0.0001474422,0.0004060556,0.0007404578,0.00045102552],"domain_scores_gemma":[0.96722287,0.02857073,0.0018528431,0.00078600156,0.0010850313,0.0004826571],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0066237743,0.00086502807,0.00082877267,0.0029324174,0.0008740095,0.0035698912,0.0022635972,0.0021802834,0.0053181904],"category_scores_gemma":[0.031761687,0.00056365866,0.000979816,0.001657374,0.0032606637,0.0028827267,0.0014990211,0.0015435463,0.0004586512],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017041634,0.00093517476,0.03377061,0.00021081614,0.00021663951,0.00019891813,0.0006993609,0.53298867,0.0007203128,0.3839545,0.001694541,0.044439994],"study_design_scores_gemma":[0.00007384628,0.000371431,0.0131619,0.00006769165,0.0000727648,0.000076983466,0.0006535228,0.72651654,0.00047352345,0.2573242,0.0011653677,0.00004221799],"about_ca_topic_score_codex":0.008259563,"about_ca_topic_score_gemma":0.005261139,"teacher_disagreement_score":0.008259563,"about_ca_system_score_codex":0.0028158994,"about_ca_system_score_gemma":0.0031863826,"threshold_uncertainty_score":0.035030305},"labels":[],"label_agreement":null},{"id":"W2011017128","doi":"10.1061/41109(373)118","title":"Activity Overlapping Assessment in Construction, Oil, and Gas Projects","year":2010,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Rework; Schedule; Computer science; Risk analysis (engineering); Duration (music); Time limit; Order (exchange); Operations research; Reliability engineering; Systems engineering; Engineering","score_opus":0.05743035838080194,"score_gpt":0.3671435511510896,"score_spread":0.30971319277028764,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2011017128","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9280645,0.00024207683,0.06684679,0.000041482494,0.0000034329755,0.00018222157,0.00008865353,0.000022907454,0.004507976],"genre_scores_gemma":[0.98310363,0.00010049372,0.016231066,0.0000022677511,0.0000019819427,0.000049817645,0.00005462295,0.0000040810064,0.00045199494],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99600935,0.0015971459,0.00026771417,0.00026673812,0.0014512739,0.00040778538],"domain_scores_gemma":[0.99347186,0.0036755144,0.001289048,0.0002089748,0.0008949964,0.00045972507],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041131647,0.0005328666,0.0005469973,0.0044495836,0.0006916711,0.0012764188,0.0006256901,0.00057707465,0.0012449026],"category_scores_gemma":[0.010607637,0.00037889264,0.00044737896,0.0030406192,0.00085710816,0.0014206026,0.00204349,0.00036382032,0.00009566956],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010648892,0.00033876175,0.21538971,0.00021584478,0.00015340028,0.00065012457,0.001127195,0.6566305,0.005785519,0.012174565,0.00025846448,0.106211],"study_design_scores_gemma":[0.000045223187,0.0015647262,0.21416035,0.00008072414,0.00015858453,0.00048302143,0.004513822,0.7527312,0.007459809,0.015916154,0.0028129034,0.000073470386],"about_ca_topic_score_codex":0.0073136785,"about_ca_topic_score_gemma":0.010078686,"teacher_disagreement_score":0.0073136785,"about_ca_system_score_codex":0.0016830805,"about_ca_system_score_gemma":0.0016241876,"threshold_uncertainty_score":0.021752775},"labels":[],"label_agreement":null},{"id":"W2011388312","doi":"10.1139/l06-017","title":"How do contractors evaluate company competitiveness and market attractiveness? The case of Toronto contractors","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Profitability index; Attractiveness; Competitor analysis; Business; Marketing; Market share; Market research; Rate of return; Investment (military); Strategic planning; Market analysis; Analytic hierarchy process; Industrial organization; Finance; Economics","score_opus":0.024207283581823964,"score_gpt":0.2670319389262579,"score_spread":0.2428246553444339,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2011388312","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9525351,0.00034336923,0.00046615943,0.0036545661,0.000015468046,0.000087545,0.000027168273,0.000004051662,0.0428665],"genre_scores_gemma":[0.99838233,0.00012109561,0.00015547649,0.000055975754,0.000002812224,0.000006657521,0.000008608163,0.0000013906803,0.001265592],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99408793,0.0023944757,0.000113211376,0.00017013722,0.0016363021,0.001598027],"domain_scores_gemma":[0.99172664,0.002919673,0.0009769128,0.00014850963,0.0022240179,0.002004344],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0061949245,0.00021941842,0.00020723161,0.0019914687,0.009800891,0.0064630304,0.00068514975,0.0011216102,0.0035515674],"category_scores_gemma":[0.014572687,0.0001868164,0.00028728624,0.0022322447,0.005232777,0.0019854787,0.0018667751,0.0011246615,0.00016983645],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003244057,0.0003304027,0.4430878,0.00020088154,0.000088817505,0.006597604,0.36290166,0.0026675027,0.0019408216,0.07616969,0.010727576,0.09496285],"study_design_scores_gemma":[0.000041257765,0.00018753207,0.3088402,0.00017215018,0.0000492458,0.00068278913,0.64175624,0.0048798723,0.0009568218,0.0047095967,0.037587047,0.00013725557],"about_ca_topic_score_codex":0.8213908,"about_ca_topic_score_gemma":0.8571846,"teacher_disagreement_score":0.17860919,"about_ca_system_score_codex":0.040320948,"about_ca_system_score_gemma":0.030399745,"threshold_uncertainty_score":0.35932207},"labels":[],"label_agreement":null},{"id":"W2013080591","doi":"10.1108/17538370910971036","title":"The influence of a collaborative procurement approach using integrated design in construction on project team performance","year":2009,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":89,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Procurement; Knowledge management; Originality; Context (archaeology); Process management; Business; Computer science; Qualitative research; Marketing; Sociology","score_opus":0.08279371963583328,"score_gpt":0.36351874670008183,"score_spread":0.28072502706424857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2013080591","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9927738,0.000057797348,0.003606495,0.00006341576,0.0000065774548,0.000038245238,0.0000045975703,0.000017380045,0.0034315588],"genre_scores_gemma":[0.99810576,0.000021352365,0.0016284477,0.000007887367,0.0000029216092,0.000018625871,0.000007770382,0.000005152122,0.00020195598],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9789985,0.014380232,0.00094685605,0.0009253712,0.0035014618,0.001247676],"domain_scores_gemma":[0.93113035,0.041737843,0.0105209695,0.0044090715,0.006659217,0.0055425614],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.018622236,0.00048447624,0.00043369475,0.00090475316,0.0014895465,0.0044854134,0.0007500584,0.00056665204,0.0019243283],"category_scores_gemma":[0.044719394,0.0002752702,0.00031177083,0.0009888569,0.0017196636,0.001575494,0.0033281993,0.0009197688,0.00030016215],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.004263365,0.006514969,0.37502933,0.0009526771,0.00068158336,0.0011879613,0.038436744,0.05318759,0.02071753,0.0074356394,0.0011727755,0.49041986],"study_design_scores_gemma":[0.0005398874,0.021464283,0.7539353,0.00060906564,0.00070399046,0.0014840201,0.09221427,0.08860797,0.01908034,0.010760023,0.010238772,0.0003621022],"about_ca_topic_score_codex":0.0016328567,"about_ca_topic_score_gemma":0.0019049395,"teacher_disagreement_score":0.018622236,"about_ca_system_score_codex":0.0019358534,"about_ca_system_score_gemma":0.0026971598,"threshold_uncertainty_score":0.09848499},"labels":[],"label_agreement":null},{"id":"W2013888159","doi":"10.1108/17410401211212652","title":"The construction industry macro maturity model (CIM3): theoretical underpinnings","year":2012,"lang":"en","type":"article","venue":"International Journal of Productivity and Performance Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick; Concordia University","funders":"","keywords":"Maturity (psychological); Capability Maturity Model; Macro; Quality (philosophy); Productivity; Process management; Service Integration Maturity Model; Key (lock); Construction industry; Originality; Operations management; Business; Computer science; Marketing; Engineering; Economics; Construction engineering","score_opus":0.0464477942597483,"score_gpt":0.34542492957221216,"score_spread":0.29897713531246384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2013888159","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.060389295,0.0058211116,0.78333867,0.01300834,0.00017423366,0.0008276138,0.0019065248,0.00064166036,0.13389246],"genre_scores_gemma":[0.74217695,0.004727264,0.2450186,0.00057875994,0.00008568201,0.0011528472,0.0013023963,0.00012592219,0.0048315446],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99698395,0.0011526779,0.00026267947,0.0003173385,0.0009451336,0.00033829032],"domain_scores_gemma":[0.990044,0.0046930527,0.0015648523,0.0007247472,0.0024977431,0.00047562635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0067535248,0.0007697362,0.00041721674,0.004034033,0.00088341156,0.0046910304,0.0015721539,0.0014991345,0.0028413977],"category_scores_gemma":[0.013636406,0.0003902953,0.0010832698,0.00552169,0.0025752466,0.0045261686,0.0024565589,0.0024115522,0.00076438667],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028220044,0.000059153812,0.016168848,0.0004544596,0.00003767468,0.00012429935,0.0019206024,0.026954947,0.0005977714,0.876852,0.0032344847,0.07356746],"study_design_scores_gemma":[0.000022218843,0.00023303887,0.031143526,0.0020405927,0.00008342049,0.00035135442,0.0039952863,0.12461572,0.0014415391,0.683707,0.15220734,0.00015906639],"about_ca_topic_score_codex":0.025532655,"about_ca_topic_score_gemma":0.020132067,"teacher_disagreement_score":0.025532655,"about_ca_system_score_codex":0.011493301,"about_ca_system_score_gemma":0.009659276,"threshold_uncertainty_score":0.08339006},"labels":[],"label_agreement":null},{"id":"W2013934328","doi":"10.1002/bref.85","title":"Risk assessment in development lending","year":2003,"lang":"en","type":"article","venue":"Briefings in Real Estate Finance","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canada Mortgage and Housing Corporation","funders":"","keywords":"Underwriting; Actuarial science; Process (computing); Key (lock); Risk analysis (engineering); Finance; Business; Operations management; Computer science; Economics; Computer security","score_opus":0.06725302450024549,"score_gpt":0.37383098593446956,"score_spread":0.30657796143422406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2013934328","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25708538,0.015576114,0.5203499,0.009848064,0.0006358688,0.00085595215,0.0005724937,0.00067785324,0.19439842],"genre_scores_gemma":[0.9514207,0.0025934672,0.036341064,0.00015737458,0.00023225074,0.0001516719,0.0001362417,0.000046134577,0.008920968],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9893723,0.006573469,0.00044498272,0.00043855375,0.002808991,0.00036161818],"domain_scores_gemma":[0.9689059,0.021702837,0.0034039535,0.0007629305,0.004413897,0.0008104197],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011668205,0.0009879401,0.0008405153,0.0048622508,0.0008049242,0.005243366,0.00089126383,0.0015082202,0.005694513],"category_scores_gemma":[0.050781097,0.00033721665,0.00057463197,0.0024489742,0.002385301,0.0033136383,0.0024045259,0.001829858,0.0007052278],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005200112,0.00027019146,0.03696111,0.0006676967,0.00024857212,0.0010507139,0.002978151,0.21518603,0.0014912109,0.34979028,0.016745938,0.37409008],"study_design_scores_gemma":[0.00007059865,0.00042554518,0.016830234,0.000594177,0.00009374296,0.0006909787,0.0034038713,0.3393671,0.0032997855,0.59131527,0.043718826,0.00018993118],"about_ca_topic_score_codex":0.0026648906,"about_ca_topic_score_gemma":0.0013622865,"teacher_disagreement_score":0.011668205,"about_ca_system_score_codex":0.002431734,"about_ca_system_score_gemma":0.0016317329,"threshold_uncertainty_score":0.061708093},"labels":[],"label_agreement":null},{"id":"W2016149547","doi":"10.1016/j.ijproman.2013.07.008","title":"Governance performance in complex environment: The case of a major transformation in a university hospital","year":2013,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":78,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; McGill University Health Centre; Université du Québec à Montréal","funders":"","keywords":"Hierarchy; Corporate governance; Process management; Relation (database); Action research; Transformation (genetics); Process (computing); Action (physics); Citizen journalism; Sociology; Management; Knowledge management; Business; Political science; Computer science; Economics; Law","score_opus":0.033793016375550766,"score_gpt":0.2927628630962473,"score_spread":0.25896984672069656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2016149547","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98257107,0.00004518272,0.0005352929,0.0064762137,0.00003197421,0.0000388234,0.000024208957,0.000018516463,0.010258734],"genre_scores_gemma":[0.9983632,0.000033347216,0.0001492701,0.00012971593,0.000011137071,0.000004985501,0.000009213667,0.0000046684977,0.0012944337],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.995858,0.0017304177,0.0000709482,0.0001664424,0.00028049,0.0018936659],"domain_scores_gemma":[0.99367225,0.0011466456,0.00051369815,0.00019320623,0.00046224432,0.004011989],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002362699,0.0003624413,0.0003354673,0.0010991582,0.012329026,0.007572391,0.002125499,0.004900671,0.00641114],"category_scores_gemma":[0.0042403284,0.00034174486,0.0005728296,0.0014147622,0.007438308,0.0020680763,0.005308973,0.0038995503,0.00062216347],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019217203,0.0065459628,0.2570279,0.0002478832,0.00031839218,0.17658944,0.2516292,0.047969967,0.00689336,0.17014734,0.02742666,0.05328222],"study_design_scores_gemma":[0.00019760357,0.0013777475,0.10737297,0.00015970928,0.000080491955,0.0074587977,0.80359596,0.030040922,0.0016750394,0.018351818,0.029490124,0.00019888693],"about_ca_topic_score_codex":0.071488254,"about_ca_topic_score_gemma":0.10830867,"teacher_disagreement_score":0.071488254,"about_ca_system_score_codex":0.012316212,"about_ca_system_score_gemma":0.0077400487,"threshold_uncertainty_score":0.14214432},"labels":[],"label_agreement":null},{"id":"W2016846667","doi":"10.1097/00124645-200307000-00007","title":"Project Management","year":2003,"lang":"en","type":"review","venue":"Journal for Nurses in Staff Development","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Lethbridge","funders":"","keywords":"Project management; Project planning; Project management triangle; Process management; Business; Productivity; Stress management; OPM3; Operations management; Work (physics); Conflict management; Program management; Work breakdown structure; Earned value management; Project risk management; Engineering management; Project manager; Project charter; Psychology; Engineering; Political science; Systems engineering","score_opus":0.2599963829577382,"score_gpt":0.5070121346214974,"score_spread":0.24701575166375922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2016846667","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0037805368,0.46357855,0.08918176,0.017074449,0.006163928,0.0021422245,0.000987637,0.0023992886,0.4146916],"genre_scores_gemma":[0.04673455,0.532436,0.086888276,0.0093343565,0.0038234196,0.0027759788,0.002059239,0.00031936058,0.31562877],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99758506,0.00060044846,0.00022669906,0.00024216645,0.0012223027,0.00012342753],"domain_scores_gemma":[0.99671304,0.0007620837,0.00038764576,0.00034253136,0.0013530683,0.00044155426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028905745,0.00056192366,0.00062147813,0.0018355893,0.0007617779,0.001673173,0.0013464174,0.0011234767,0.033047847],"category_scores_gemma":[0.008555179,0.00023715745,0.0003275109,0.0019253641,0.0005644953,0.0013248092,0.0017060101,0.0012422825,0.029162034],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014112442,0.00003805439,0.00023701665,0.00094826234,0.000010152934,0.0000636564,0.00017963618,0.00007279058,0.00039782046,0.0038531728,0.084199615,0.9099857],"study_design_scores_gemma":[0.000007451481,0.000057534995,0.0014332341,0.0013013101,0.000007527312,0.0005687671,0.00013124905,0.000060238915,0.0002297424,0.002421015,0.9937727,0.000009201693],"about_ca_topic_score_codex":0.0010421855,"about_ca_topic_score_gemma":0.0018166241,"teacher_disagreement_score":0.033047847,"about_ca_system_score_codex":0.00091197697,"about_ca_system_score_gemma":0.0029481861,"threshold_uncertainty_score":0.110556066},"labels":[],"label_agreement":null},{"id":"W2017588756","doi":"10.5267/j.uscm.2014.7.003","title":"Which contractor selection methodology?","year":2014,"lang":"en","type":"article","venue":"Uncertain Supply Chain Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Selection (genetic algorithm); Business; Computer science; Operations management; Artificial intelligence; Economics","score_opus":0.09156613483293297,"score_gpt":0.36416787097899056,"score_spread":0.2726017361460576,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2017588756","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06709344,0.006299439,0.8143285,0.027581679,0.003068149,0.0040315134,0.001740313,0.0007390538,0.07511794],"genre_scores_gemma":[0.45054352,0.0060127107,0.49560094,0.00520635,0.0017229817,0.004985549,0.0015323407,0.00051918515,0.03387642],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9453337,0.040936597,0.0024826222,0.0024282308,0.007760988,0.0010577793],"domain_scores_gemma":[0.9554105,0.022056686,0.004749598,0.0060227443,0.009839378,0.0019210675],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.040668964,0.0005408587,0.0011262407,0.0034299497,0.0012306015,0.0030151529,0.0018447733,0.0010060909,0.023094894],"category_scores_gemma":[0.0772618,0.00031873287,0.0010721637,0.006749243,0.001645661,0.0030977805,0.0016006266,0.0012133885,0.0042786333],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003851366,0.00030973536,0.025838947,0.001127341,0.00041123258,0.00015364132,0.0024156529,0.0011586838,0.00069780106,0.100652836,0.03429655,0.8325524],"study_design_scores_gemma":[0.0012035596,0.0015583754,0.056223363,0.0057325433,0.00081927585,0.0029216793,0.01586184,0.05345041,0.007275445,0.3156775,0.5388325,0.00044351874],"about_ca_topic_score_codex":0.0038834214,"about_ca_topic_score_gemma":0.0052645192,"teacher_disagreement_score":0.040668964,"about_ca_system_score_codex":0.0018742648,"about_ca_system_score_gemma":0.0057277833,"threshold_uncertainty_score":0.21508062},"labels":[],"label_agreement":null},{"id":"W2018966225","doi":"10.1016/j.compind.2010.04.002","title":"Corrigendum to “Supporting conflict management in collaborative design: An approach to assess engineering change impacts” [Comput. Ind. 59 (December(9)) (2008) 882–893, doi:10.1016/j.compind.2008.07.010]","year":2010,"lang":"en","type":"erratum","venue":"Computers in Industry","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Operations research; Engineering management; Computer science; Industrial engineering; Engineering","score_opus":0.20556995142108056,"score_gpt":0.3766268689250872,"score_spread":0.17105691750400662,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2018966225","genre_codex":"editorial","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00020563054,0.0020826359,0.0015437212,0.07083488,0.90398926,0.00011298022,0.0014164948,0.0005931296,0.019221297],"genre_scores_gemma":[0.008073103,0.010363133,0.0048763244,0.088061854,0.17622684,0.000510153,0.004057565,0.0012392162,0.70659184],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.995518,0.0007874815,0.00066202896,0.0005310509,0.0021085707,0.00039275893],"domain_scores_gemma":[0.96556205,0.0074120434,0.00090013567,0.0014183525,0.023886465,0.0008209017],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031718232,0.0029002193,0.002712238,0.0046650297,0.0049983794,0.0043941215,0.004448076,0.008857576,0.15706395],"category_scores_gemma":[0.04752325,0.001370097,0.002347467,0.003964712,0.0025215358,0.0032431907,0.0031091857,0.007299961,0.09323599],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001482604,0.0000097980765,0.0000459152,0.00007488388,0.0000055838623,0.00009285542,0.000018728166,0.000058180744,0.000032334476,0.00047383708,0.9953939,0.0037792071],"study_design_scores_gemma":[0.00003130119,0.000039085586,0.0015833165,0.00028041238,0.000033862936,0.00021213156,0.00016910877,0.00045139084,0.00032119098,0.0017444292,0.9950708,0.00006284558],"about_ca_topic_score_codex":0.063236676,"about_ca_topic_score_gemma":0.08544947,"teacher_disagreement_score":0.15706395,"about_ca_system_score_codex":0.0062665134,"about_ca_system_score_gemma":0.0035692626,"threshold_uncertainty_score":0.5254313},"labels":[],"label_agreement":null},{"id":"W2018979375","doi":"10.1139/l05-002","title":"Improving decision quality: a risk-based go/no-go decision for buildoperatetransfer (BOT) projects","year":2005,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Rule of thumb; Intuition; Computer science; Risk analysis (engineering); Quality (philosophy); Decision model; Operations research; Management science; Decision analysis; Project management; Engineering; Systems engineering; Machine learning; Business; Mathematics","score_opus":0.038585602653720595,"score_gpt":0.2993925869584384,"score_spread":0.2608069843047178,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2018979375","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6385714,0.00012709101,0.34606647,0.0015572861,0.0000308345,0.0016870408,0.00011020607,0.00020842598,0.01164118],"genre_scores_gemma":[0.9176148,0.00004372498,0.081649065,0.000051835636,0.0000045939532,0.00027818492,0.000043575656,0.000010362629,0.0003038906],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.978408,0.016486159,0.000794936,0.0008275673,0.0028467102,0.00063662534],"domain_scores_gemma":[0.9524581,0.037512243,0.0042141746,0.0019614336,0.0026485375,0.0012053655],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02871806,0.00087293796,0.0006716682,0.002034693,0.001399717,0.0034432262,0.0013836009,0.0016029091,0.002318951],"category_scores_gemma":[0.071096495,0.000421318,0.0012724749,0.0011321235,0.002775832,0.0037773312,0.0030826353,0.0019068007,0.0002138537],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0026771617,0.0030685817,0.089983284,0.0009710639,0.0005163702,0.0006838338,0.014574611,0.38286453,0.005158111,0.19790354,0.0028016947,0.29879725],"study_design_scores_gemma":[0.0003385258,0.0015700624,0.02038317,0.00027320095,0.00016190264,0.00015570114,0.003536734,0.85938644,0.0029016004,0.10810054,0.0030403843,0.00015179712],"about_ca_topic_score_codex":0.0035686996,"about_ca_topic_score_gemma":0.004744531,"teacher_disagreement_score":0.02871806,"about_ca_system_score_codex":0.0044189654,"about_ca_system_score_gemma":0.0040318975,"threshold_uncertainty_score":0.1518774},"labels":[],"label_agreement":null},{"id":"W2019363971","doi":"10.1016/j.ijproman.2008.01.001","title":"Preparing project managers to deal with complexity – Advanced project management education","year":2008,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":469,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick; Athabasca University","funders":"","keywords":"Project management triangle; Extreme project management; Project management; OPM3; Project charter; Project manager; Project stakeholder; Program management; Project planning; Project risk management; Project management 2.0; Standardization; Engineering management; Knowledge management; Software project management; Project governance; Project portfolio management; Process management; Project sponsorship; Computer science; Business; Engineering; Systems engineering; Corporate governance; Software development","score_opus":0.10072030469945695,"score_gpt":0.4076500771176228,"score_spread":0.3069297724181659,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2019363971","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78660226,0.001220777,0.08611184,0.04177496,0.0010274162,0.0011634537,0.00004785428,0.0004847347,0.08156662],"genre_scores_gemma":[0.87540585,0.0012217517,0.092126764,0.003324548,0.00034087876,0.00042876313,0.00009588473,0.000041063806,0.027014572],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99777955,0.00085615687,0.00009833225,0.0001276508,0.0007582591,0.00037997492],"domain_scores_gemma":[0.98854893,0.0023792565,0.0020674318,0.00046239892,0.0021818518,0.004360043],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004637519,0.000421595,0.00020713756,0.00062744186,0.0010711602,0.0025646712,0.0006157987,0.0013984964,0.0051615373],"category_scores_gemma":[0.012174705,0.00043763194,0.00027559765,0.00038175602,0.0005646728,0.002089282,0.0024677012,0.002463989,0.001238194],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033249237,0.007865203,0.054990448,0.00082986633,0.00004440086,0.0013899215,0.017281514,0.007454493,0.01683735,0.019480556,0.060651902,0.8128419],"study_design_scores_gemma":[0.0006807735,0.00610279,0.28338218,0.0024845302,0.000111542664,0.006077937,0.044855356,0.027379634,0.02419042,0.10554677,0.49886924,0.00031887958],"about_ca_topic_score_codex":0.00038877074,"about_ca_topic_score_gemma":0.0015779261,"teacher_disagreement_score":0.0051615373,"about_ca_system_score_codex":0.0010243303,"about_ca_system_score_gemma":0.006034403,"threshold_uncertainty_score":0.02452588},"labels":[],"label_agreement":null},{"id":"W2019572856","doi":"10.1002/pmj.20269","title":"Pluralism in PMO Performance: The Case of a PMO Dedicated to a Major Organizational Transformation","year":2011,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":58,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University; McGill University Health Centre; Université du Québec à Montréal","funders":"","keywords":"Corporate governance; Context (archaeology); Business; Process management","score_opus":0.08716086107197187,"score_gpt":0.3400806859008029,"score_spread":0.2529198248288311,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2019572856","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9248293,0.00015975744,0.0040679197,0.012991955,0.0000843769,0.00006111808,0.0000092340615,0.000012454808,0.057783898],"genre_scores_gemma":[0.99812394,0.000046854075,0.0004809626,0.0002696358,0.00002356427,0.000013838024,0.0000045958764,0.000007966861,0.0010286287],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.95792645,0.02580512,0.0008619627,0.0017269967,0.0058436533,0.007835833],"domain_scores_gemma":[0.9745636,0.009767934,0.003337517,0.0014050949,0.0018727756,0.009053021],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020892793,0.0005439584,0.000614771,0.0024618215,0.031581033,0.016100615,0.0018351298,0.0055776583,0.0026314086],"category_scores_gemma":[0.028198482,0.00050897576,0.0009206785,0.0025849962,0.041809667,0.0066985087,0.020393535,0.007846882,0.00028097982],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022529924,0.00041533256,0.030365027,0.00010923197,0.00004092982,0.0105936425,0.63233346,0.0011554258,0.0021251128,0.30107683,0.0023654962,0.019194162],"study_design_scores_gemma":[0.00006398517,0.00031384567,0.022858478,0.00016930961,0.00002306836,0.002866814,0.87434524,0.0025783014,0.0008438994,0.060546763,0.035275523,0.00011474671],"about_ca_topic_score_codex":0.017747292,"about_ca_topic_score_gemma":0.024267854,"teacher_disagreement_score":0.031581033,"about_ca_system_score_codex":0.012482896,"about_ca_system_score_gemma":0.010900435,"threshold_uncertainty_score":0.110493004},"labels":[],"label_agreement":null},{"id":"W2021809362","doi":"10.1139/l10-036","title":"Application of fuzzy logic to quality assessment of infrastructure projects at conceptual cost estimating stage","year":2010,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Government of Alberta; University of Alberta","funders":"","keywords":"Scope (computer science); Fuzzy logic; Quality (philosophy); Computer science; Conceptual model; Conceptual design; Cost estimate; Heuristic; Project management; Management science; Operations research; Systems engineering; Engineering; Artificial intelligence","score_opus":0.0551877162361538,"score_gpt":0.3485097310118994,"score_spread":0.2933220147757456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2021809362","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039918132,0.00016113762,0.9514187,0.0003936287,0.00002519328,0.00014128396,0.00007968983,0.00013453078,0.0077277115],"genre_scores_gemma":[0.71186364,0.0002505143,0.2853316,0.00007438001,0.000027313914,0.0002267397,0.00010036692,0.000020412335,0.0021050232],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99797505,0.00085513067,0.00010702389,0.00017736462,0.00071909855,0.00016630605],"domain_scores_gemma":[0.9974009,0.0015818314,0.0002673335,0.00008377964,0.00059385353,0.00007239814],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002934303,0.0006615978,0.0005905151,0.0017083781,0.0007529577,0.0020941582,0.0012857757,0.00096822734,0.0016166992],"category_scores_gemma":[0.0075463844,0.00036815176,0.0011101173,0.0011113802,0.0012071927,0.0015898478,0.00073253125,0.0008187945,0.00018660081],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009158723,0.000070800466,0.0018331828,0.00008401166,0.000042600463,0.0001838599,0.00036681,0.90183824,0.0014903812,0.055701386,0.00043695237,0.03786022],"study_design_scores_gemma":[0.000015933614,0.000040680232,0.00029876287,0.000020203348,0.000013392661,0.000026487343,0.00005527506,0.9781491,0.0006769707,0.019962685,0.00072415447,0.000016316946],"about_ca_topic_score_codex":0.023024363,"about_ca_topic_score_gemma":0.012938724,"teacher_disagreement_score":0.023024363,"about_ca_system_score_codex":0.004098255,"about_ca_system_score_gemma":0.002273109,"threshold_uncertainty_score":0.04578066},"labels":[],"label_agreement":null},{"id":"W2022313526","doi":"10.3763/asre.2006.4905","title":"Public Healthcare Project Appraisal in the United Arab Emirates: Towards Better Feasibility","year":2006,"lang":"en","type":"article","venue":"Architectural Science Review","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Windsor; Utah Agricultural Experiment Station","keywords":"Procurement; Health care; Scope (computer science); Business; Public sector; Government (linguistics); Private sector; Project appraisal; Marketing; Finance; Political science; Computer science","score_opus":0.2681204471748064,"score_gpt":0.45323109879130213,"score_spread":0.18511065161649576,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2022313526","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61791766,0.17862473,0.030086452,0.055386182,0.0013605029,0.0098638935,0.0009029155,0.00013756404,0.10572011],"genre_scores_gemma":[0.8910317,0.06306129,0.038931057,0.0010059279,0.00019973953,0.0026636065,0.000431395,0.000022489778,0.0026529615],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.8845714,0.09342139,0.005085702,0.0011987947,0.013098911,0.0026238228],"domain_scores_gemma":[0.7839357,0.13250549,0.015040285,0.003085957,0.06204214,0.0033903534],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.121542715,0.00133472,0.0012501201,0.009942416,0.0024437658,0.012125835,0.0022865247,0.002414632,0.0044349944],"category_scores_gemma":[0.14781165,0.0010330462,0.0010075509,0.010996745,0.0026878882,0.0072909025,0.0052060722,0.0021341841,0.00048387906],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001229337,0.0021566255,0.049595412,0.03516911,0.00043265763,0.0019243198,0.030669881,0.014713362,0.0017006204,0.08518471,0.012541896,0.7646822],"study_design_scores_gemma":[0.00046386657,0.007450075,0.1975168,0.08389779,0.00060059375,0.0010507542,0.32997036,0.031339392,0.0029907494,0.033936962,0.3103497,0.0004330585],"about_ca_topic_score_codex":0.024402069,"about_ca_topic_score_gemma":0.034360778,"teacher_disagreement_score":0.121542715,"about_ca_system_score_codex":0.017212035,"about_ca_system_score_gemma":0.05901405,"threshold_uncertainty_score":0.642787},"labels":[],"label_agreement":null},{"id":"W2022328499","doi":"10.1016/j.sbspro.2013.03.021","title":"Impacts of Engineering Work Quality on Project Success","year":2013,"lang":"en","type":"article","venue":"Procedia - Social and Behavioral Sciences","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Work (physics); Quality (philosophy); Engineering management; Engineering; Construction engineering; Computer science; Systems engineering; Manufacturing engineering; Mechanical engineering","score_opus":0.24554969860549786,"score_gpt":0.46118513308578535,"score_spread":0.2156354344802875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2022328499","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98927385,0.0004258233,0.0009669104,0.0004576792,0.000015668982,0.000044418037,0.00006939207,0.000022855922,0.008723457],"genre_scores_gemma":[0.99923396,0.00008605993,0.00023501272,0.00001843668,0.000008600007,0.000009905724,0.00002281775,0.000004808275,0.00038049923],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9887367,0.0046391864,0.00077866623,0.00040787074,0.004009398,0.0014283427],"domain_scores_gemma":[0.91165173,0.03971571,0.018357402,0.002630232,0.013068786,0.014576101],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0058121597,0.00025686508,0.00024467657,0.0015200119,0.0009118771,0.0027338138,0.0003573588,0.00038714585,0.004382809],"category_scores_gemma":[0.033249047,0.00017637275,0.0004316482,0.0011687189,0.0009954182,0.00062321627,0.0012854015,0.0008424203,0.00044678405],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004019183,0.0010485951,0.8924933,0.00028350583,0.0002277551,0.00046647707,0.0049361326,0.001671961,0.0021851263,0.001085121,0.0010779798,0.0941221],"study_design_scores_gemma":[0.000012650994,0.000516051,0.99228996,0.00007768646,0.00004193753,0.00013148437,0.0037481266,0.0008397759,0.00055212993,0.0003499305,0.0014200921,0.000020203626],"about_ca_topic_score_codex":0.003446692,"about_ca_topic_score_gemma":0.004256557,"teacher_disagreement_score":0.0058121597,"about_ca_system_score_codex":0.0012700428,"about_ca_system_score_gemma":0.0021832772,"threshold_uncertainty_score":0.030737996},"labels":[],"label_agreement":null},{"id":"W2023121675","doi":"10.1016/j.ijproman.2007.05.012","title":"Assessing risk and uncertainty inherent in Chinese highway projects using AHP","year":2007,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":321,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Analytic hierarchy process; Risk assessment; Risk analysis (engineering); Bidding; Macro; Engineering; Stakeholder; Project risk management; Transport engineering; Project management; Business; Operations research; Computer science; Project management triangle; Economics; Systems engineering; Computer security","score_opus":0.10981789180332249,"score_gpt":0.4478232699552348,"score_spread":0.33800537815191234,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2023121675","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9093144,0.00020378699,0.08770884,0.0001675288,0.000023070175,0.00023104007,0.00022826955,0.000085847816,0.002037144],"genre_scores_gemma":[0.99011594,0.00006135299,0.009492085,0.000009067283,0.000008749509,0.00008186381,0.0001011206,0.000004384945,0.00012550456],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9953864,0.0015900485,0.00042937187,0.0003608278,0.0017094755,0.00052381755],"domain_scores_gemma":[0.9852727,0.011285502,0.0007569206,0.00046425388,0.0019140551,0.00030660795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0064451336,0.0011315471,0.00109274,0.00460726,0.0016069186,0.0021900658,0.0010661193,0.00087276706,0.0005193851],"category_scores_gemma":[0.011858014,0.00070879346,0.0014832725,0.003073971,0.0009919958,0.0018603597,0.0013796358,0.0006843908,0.000033988916],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036814733,0.00017641208,0.045039482,0.00027794545,0.0003391891,0.00045470273,0.0008550336,0.89777243,0.0021558714,0.0043352777,0.00038084137,0.047844697],"study_design_scores_gemma":[0.000033233013,0.000118001626,0.011999439,0.000020717685,0.0001280407,0.00004133313,0.00077463227,0.9791595,0.0013253951,0.0061522024,0.00019787581,0.000049675447],"about_ca_topic_score_codex":0.029187402,"about_ca_topic_score_gemma":0.01714401,"teacher_disagreement_score":0.029187402,"about_ca_system_score_codex":0.004562678,"about_ca_system_score_gemma":0.004865376,"threshold_uncertainty_score":0.058035016},"labels":[],"label_agreement":null},{"id":"W2023379220","doi":"10.1108/17538370810906291","title":"Using vision as a critical success element in project management","year":2008,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Ministry of Labour","funders":"","keywords":"Project management; Project team; Relevance (law); Project stakeholder; Project charter; Knowledge management; Action research; Project manager; Project management triangle; Process management; Computer science; Psychology; Engineering; Political science; Pedagogy","score_opus":0.15558235537813703,"score_gpt":0.4622158626941247,"score_spread":0.30663350731598765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2023379220","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17367303,0.0052406965,0.47289577,0.07447189,0.0022210663,0.0063650548,0.00014317453,0.00082803227,0.2641613],"genre_scores_gemma":[0.7753354,0.001527212,0.20959684,0.0032321385,0.0002404433,0.0042704404,0.0000730635,0.00021441486,0.005510115],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.7774035,0.18760619,0.0061318637,0.005804544,0.019473966,0.003579923],"domain_scores_gemma":[0.6705113,0.24252418,0.025716659,0.01629089,0.033338543,0.011618445],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.16065611,0.0016244032,0.0009149949,0.009284627,0.010335428,0.02619238,0.0031719122,0.0029236167,0.004031574],"category_scores_gemma":[0.17066611,0.0016475989,0.001303993,0.0044049327,0.04365651,0.023197806,0.019827751,0.008430172,0.00095988915],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023297631,0.00050128484,0.0073745474,0.0032793323,0.00013311201,0.00042428926,0.2976847,0.0014911515,0.002127894,0.40914348,0.013783757,0.26382354],"study_design_scores_gemma":[0.00022485034,0.0016808494,0.009851946,0.0121866735,0.00021559153,0.0011240732,0.3236765,0.0073883384,0.008272981,0.3983421,0.23648493,0.0005512247],"about_ca_topic_score_codex":0.002090566,"about_ca_topic_score_gemma":0.0017201263,"teacher_disagreement_score":0.16065611,"about_ca_system_score_codex":0.016926479,"about_ca_system_score_gemma":0.03099359,"threshold_uncertainty_score":0.84964085},"labels":[],"label_agreement":null},{"id":"W2025221581","doi":"10.1002/pmj.20033","title":"Project Management Practice, Generic or Contextual: A Reality Check","year":2008,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":161,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Project management; Knowledge management; Process management; Computer science; Engineering; Systems engineering","score_opus":0.2699101122340073,"score_gpt":0.43502955056185894,"score_spread":0.16511943832785164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2025221581","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9878349,0.00035096574,0.0022437177,0.0005105087,0.000018053397,0.00014583497,0.00018563987,0.000012999294,0.008697482],"genre_scores_gemma":[0.99886143,0.000111436864,0.00074911915,0.000037907437,0.0000060752914,0.00007155333,0.000058995738,0.0000033811314,0.00010004132],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.96351916,0.024904866,0.0031208058,0.0031012716,0.00424065,0.0011132724],"domain_scores_gemma":[0.8822998,0.07565657,0.016185157,0.013035552,0.01155397,0.001269063],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.026086804,0.00029507975,0.0004551154,0.0047341757,0.0019995987,0.0035302292,0.0007149285,0.0006592495,0.0024019834],"category_scores_gemma":[0.07193814,0.0003360938,0.00053186086,0.004267454,0.0057823705,0.006106229,0.0061128363,0.00089397014,0.00019499043],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005444247,0.00044392655,0.53066343,0.0012973595,0.0002625167,0.0014969639,0.37097114,0.0008528345,0.0025717623,0.016831195,0.0010059207,0.07305849],"study_design_scores_gemma":[0.000051499414,0.0012229607,0.57976514,0.0005853142,0.00016062417,0.0015718512,0.39804855,0.0013792149,0.00088500575,0.0025209652,0.013697966,0.000110882116],"about_ca_topic_score_codex":0.002510994,"about_ca_topic_score_gemma":0.0029120676,"teacher_disagreement_score":0.026086804,"about_ca_system_score_codex":0.0016767748,"about_ca_system_score_gemma":0.0010000046,"threshold_uncertainty_score":0.13796186},"labels":[],"label_agreement":null},{"id":"W2026173337","doi":"10.5539/jsd.v4n2p254","title":"Factors Influencing Construction Clients’/Contractors’ Choice of Subcontractors in Nigeria","year":2011,"lang":"en","type":"article","venue":"Journal of Sustainable Development","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Procurement; Business; Ranking (information retrieval); Sustainability; Port (circuit theory); Resource (disambiguation); Construction industry; Developing country; Operations management; Marketing; Economic growth; Computer science; Economics; Construction engineering","score_opus":0.0818317359197926,"score_gpt":0.3183804403112519,"score_spread":0.2365487043914593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2026173337","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9983631,0.000054162923,0.00005869358,0.000087034336,0.0000014479994,0.000008606496,0.000006391622,7.6291104e-7,0.0014198789],"genre_scores_gemma":[0.9989097,0.00012753191,0.00009512591,0.000015519905,0.000001334476,0.000006882439,0.000008015291,0.00000124832,0.0008345903],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9971841,0.0011994159,0.00017249752,0.00013407652,0.0005986191,0.0007112691],"domain_scores_gemma":[0.99427795,0.0022575725,0.0012608088,0.00014540848,0.00084031717,0.0012178916],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021353208,0.00020076493,0.00020801238,0.00081647426,0.0023154104,0.0018436366,0.00039567813,0.00043185003,0.005123574],"category_scores_gemma":[0.0069063427,0.00028185183,0.00010641151,0.0010782655,0.0010396051,0.0004525518,0.00082326494,0.0005956494,0.00045599087],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022484889,0.0004908784,0.8686375,0.00010364301,0.0000132692785,0.0020487346,0.060922,0.00028816183,0.0022977858,0.0010823886,0.0011753857,0.06271536],"study_design_scores_gemma":[0.000012543288,0.00020295319,0.53813934,0.00017153843,0.000017130506,0.001848644,0.45140213,0.0009348823,0.0007192825,0.0003537417,0.006155912,0.000041909527],"about_ca_topic_score_codex":0.022569368,"about_ca_topic_score_gemma":0.04005931,"teacher_disagreement_score":0.022569368,"about_ca_system_score_codex":0.0013082556,"about_ca_system_score_gemma":0.0026097654,"threshold_uncertainty_score":0.04487598},"labels":[],"label_agreement":null},{"id":"W2026733204","doi":"10.1139/l05-087","title":"An analytic hierarchy process based model for risk and opportunity assessment of international construction projects","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":106,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Analytic hierarchy process; Bidding; Ranking (information retrieval); Risk analysis (engineering); Risk assessment; Process (computing); Risk management; Project management; Engineering; Computer science; Operations research; Business; Marketing; Finance; Systems engineering; Computer security","score_opus":0.04688017997342789,"score_gpt":0.3239394617543188,"score_spread":0.2770592817808909,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2026733204","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016697807,0.00030939488,0.9742333,0.0007747256,0.00004829081,0.0007185686,0.0002674902,0.00024768309,0.00670263],"genre_scores_gemma":[0.31148806,0.0007465709,0.6831289,0.00008628132,0.00006758839,0.0019439984,0.0005454905,0.000029915464,0.0019633155],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99252254,0.004124433,0.00043731165,0.00037664085,0.0021816385,0.00035746788],"domain_scores_gemma":[0.9923245,0.004889618,0.00075414724,0.00022979344,0.0015140398,0.00028796672],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008763056,0.0011606794,0.00092353206,0.0044005075,0.0016692327,0.0044860523,0.0023965233,0.0013983579,0.0028016756],"category_scores_gemma":[0.01812787,0.0005188237,0.0013196027,0.0051536327,0.0014060918,0.004017766,0.0015242216,0.0020766784,0.0006011729],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016992085,0.00038448634,0.0067141326,0.00072270376,0.00025893628,0.0004779708,0.004840685,0.48663723,0.0017954701,0.3256291,0.0061961054,0.16617317],"study_design_scores_gemma":[0.00006664699,0.00021129288,0.0014771955,0.0001250592,0.000059231457,0.000089440844,0.0007267825,0.88000566,0.00026834468,0.11137993,0.005530428,0.000059956183],"about_ca_topic_score_codex":0.014313075,"about_ca_topic_score_gemma":0.012022831,"teacher_disagreement_score":0.014313075,"about_ca_system_score_codex":0.0046209106,"about_ca_system_score_gemma":0.0058001997,"threshold_uncertainty_score":0.04634404},"labels":[],"label_agreement":null},{"id":"W2027500118","doi":"10.1139/l06-075","title":"Activity vulnerability index for delay risk forecasting","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Konkuk University","keywords":"Vulnerability (computing); Vulnerability index; Index (typography); Vulnerability assessment; Fuzzy set; Fuzzy logic; Computer science; Set (abstract data type); Risk analysis (engineering); Risk assessment; Statistics; Data mining; Mathematics; Artificial intelligence; Computer security; Business; Psychology; Psychological resilience; Climate change","score_opus":0.04684272076013059,"score_gpt":0.2762296501928935,"score_spread":0.22938692943276295,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2027500118","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33233824,0.0012673431,0.6483778,0.00041588815,0.00012939665,0.00021842112,0.0023548405,0.0005023535,0.014395686],"genre_scores_gemma":[0.9059382,0.00031977578,0.09132429,0.000018084818,0.000037470225,0.00009779573,0.00086786406,0.0000154495,0.0013810265],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9994417,0.00011450405,0.00004695129,0.00006827634,0.00028066567,0.000047870333],"domain_scores_gemma":[0.9982698,0.0007452398,0.00021746647,0.00013790725,0.00051913934,0.00011053779],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012036545,0.00044262796,0.00039472608,0.0036572216,0.00027878082,0.00086170615,0.00044792367,0.0004649502,0.0016995085],"category_scores_gemma":[0.005080722,0.00012170693,0.00040614698,0.0025625292,0.00024587626,0.0013082293,0.00056593586,0.00045272286,0.0003935934],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043752635,0.0002347876,0.091934316,0.0002531945,0.00019924217,0.0003012969,0.00038985236,0.4634807,0.014409799,0.034345187,0.0060692374,0.38794485],"study_design_scores_gemma":[0.000016590608,0.00018902247,0.021907018,0.00005154671,0.00007226259,0.00018590195,0.00016839606,0.9473735,0.0057742307,0.017350186,0.0068463976,0.00006485278],"about_ca_topic_score_codex":0.0033026924,"about_ca_topic_score_gemma":0.0027509218,"teacher_disagreement_score":0.0036572216,"about_ca_system_score_codex":0.0011527973,"about_ca_system_score_gemma":0.0007235928,"threshold_uncertainty_score":0.008364201},"labels":[],"label_agreement":null},{"id":"W2027815363","doi":"10.5430/ijba.v4n6p41","title":"Assessing Project Management Maturity in Africa: A Ghanaian Perspective","year":2013,"lang":"en","type":"article","venue":"International Journal of Business Administration","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Maturity (psychological); OPM3; Project management; Business; Capability Maturity Model; Exploratory research; Process management; Product life-cycle management; Program management; Knowledge management; Marketing; Operations management; Engineering; Political science; Computer science; Management; Sociology; Economics; Social science","score_opus":0.11672500924338892,"score_gpt":0.41249767365447515,"score_spread":0.29577266441108624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2027815363","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95290416,0.008295895,0.0036269915,0.00813111,0.000039052986,0.00012655846,0.00014176147,0.0000147023,0.026719674],"genre_scores_gemma":[0.9926474,0.003576041,0.0026480402,0.00022300721,0.000009231288,0.00002792317,0.000028813613,0.000004281462,0.0008353186],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99882454,0.00070223847,0.000080977865,0.00005350514,0.00014745697,0.00019131914],"domain_scores_gemma":[0.99684143,0.0012321871,0.00096694875,0.000059683724,0.00049497647,0.00040476662],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025536644,0.00027839115,0.00016875201,0.001986454,0.0009594708,0.0016871579,0.00026174274,0.0004165241,0.001548691],"category_scores_gemma":[0.004872228,0.00024296237,0.00009287382,0.0022244724,0.0012715275,0.0021855617,0.0014080026,0.00063182035,0.00014444458],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018755687,0.00022725876,0.36068428,0.0019389101,0.000050820938,0.007301774,0.24927445,0.0013026841,0.0058204457,0.037964504,0.006652802,0.32859457],"study_design_scores_gemma":[0.00002414974,0.0004554417,0.37999594,0.003557275,0.000041715033,0.0035747278,0.4749559,0.0015118663,0.0017435711,0.009618041,0.12447312,0.00004828504],"about_ca_topic_score_codex":0.007860332,"about_ca_topic_score_gemma":0.0122083,"teacher_disagreement_score":0.007860332,"about_ca_system_score_codex":0.0019572536,"about_ca_system_score_gemma":0.0025436298,"threshold_uncertainty_score":0.015629172},"labels":[],"label_agreement":null},{"id":"W2028472385","doi":"10.1155/2014/203427","title":"Simulation-Based Fuzzy Logic Approach to Assessing the Effect of Project Quality Management on Construction Performance","year":2014,"lang":"en","type":"article","venue":"Journal of Quality and Reliability Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Consejo Nacional de Ciencia y Tecnología","keywords":"Fuzzy logic; Computer science; Quality (philosophy); Discrete event simulation; Industrial engineering; Risk analysis (engineering); Management science; Systems engineering; Operations research; Artificial intelligence; Engineering; Simulation","score_opus":0.08235982461331932,"score_gpt":0.3985760352092236,"score_spread":0.31621621059590427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2028472385","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02252655,0.00012005472,0.9715674,0.00014572134,0.000023457456,0.00010801313,0.00004840182,0.00008890639,0.0053714965],"genre_scores_gemma":[0.7747485,0.0004192312,0.22209793,0.00007313697,0.00003131568,0.00042755707,0.00008477688,0.000016687223,0.0021008921],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984754,0.0009907073,0.00005539868,0.00008462077,0.00032109435,0.00007281366],"domain_scores_gemma":[0.9975157,0.0019410768,0.00017091335,0.00007075414,0.00024910423,0.000052542113],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002455546,0.00088724814,0.0007289863,0.0014577167,0.0005419111,0.0012345545,0.0011448943,0.00083311874,0.002218641],"category_scores_gemma":[0.0042437203,0.00039244318,0.001117204,0.0007495683,0.00086022465,0.00081951066,0.0005955637,0.0009474425,0.00015506943],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028916193,0.000040689214,0.00037899803,0.00002870474,0.000035945828,0.000025785692,0.000038585727,0.9799816,0.0006955547,0.013586136,0.000048769354,0.0051103267],"study_design_scores_gemma":[0.0000077556415,0.00004143957,0.000064316926,0.0000061070104,0.000010097077,0.0000065472564,0.000010779128,0.99454653,0.00026734878,0.004801494,0.00023120258,0.0000064122014],"about_ca_topic_score_codex":0.009913908,"about_ca_topic_score_gemma":0.007706181,"teacher_disagreement_score":0.009913908,"about_ca_system_score_codex":0.0023804824,"about_ca_system_score_gemma":0.001876465,"threshold_uncertainty_score":0.019712448},"labels":[],"label_agreement":null},{"id":"W2028931726","doi":"10.1061/(asce)co.1943-7862.0000469","title":"Streamlining the Construction Productivity Improvement Process with the Proposed Role of a Construction Productivity Improvement Officer","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Productivity; Context (archaeology); Competitive advantage; Construction industry; Process (computing); Work (physics); Business; Industrial organization; Position (finance); Officer; Engineering; Process management; Operations management; Marketing; Computer science; Construction engineering; Economics; Economic growth; Geography; Finance","score_opus":0.017138898431173416,"score_gpt":0.24388783956031393,"score_spread":0.2267489411291405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2028931726","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16033311,0.0018522802,0.57924217,0.11646218,0.0023602801,0.003908926,0.00007714206,0.0011097587,0.13465418],"genre_scores_gemma":[0.74574405,0.001279027,0.21169135,0.003498091,0.0007278761,0.00091530016,0.000067684756,0.00009708438,0.03597952],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98204666,0.0082192505,0.0009000986,0.001820773,0.0041740774,0.0028391387],"domain_scores_gemma":[0.97221786,0.0056868484,0.003969948,0.0018811547,0.008070721,0.008173441],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0243531,0.00068691507,0.00051999907,0.0027559078,0.006130978,0.0104980385,0.0024484547,0.0033376731,0.006171799],"category_scores_gemma":[0.024396807,0.000621996,0.00054492673,0.0014240497,0.005219994,0.0067068366,0.008717823,0.0058460133,0.0020687634],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036079,0.0020152882,0.036390044,0.0012834842,0.000079511185,0.0016898956,0.027099125,0.0079384055,0.016331406,0.33329952,0.03070288,0.54280967],"study_design_scores_gemma":[0.00052499725,0.005324629,0.045516025,0.0026308284,0.0002863254,0.0025921355,0.06060232,0.05332549,0.022698455,0.15147135,0.6543953,0.0006321857],"about_ca_topic_score_codex":0.0033386108,"about_ca_topic_score_gemma":0.0043238113,"teacher_disagreement_score":0.0243531,"about_ca_system_score_codex":0.00462856,"about_ca_system_score_gemma":0.03893974,"threshold_uncertainty_score":0.12879306},"labels":[],"label_agreement":null},{"id":"W2029237108","doi":"10.1177/0739456x09348798","title":"Academics and Auditors","year":2009,"lang":"en","type":"article","venue":"Journal of Planning Education and Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":91,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Audit; Consistency (knowledge bases); Point (geometry); Government (linguistics); Politics; Business; Public economics; Public relations; Accounting; Finance; Economics; Political science; Computer science","score_opus":0.2841727579299068,"score_gpt":0.5555593313369748,"score_spread":0.27138657340706795,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2029237108","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.054022327,0.02429396,0.005594069,0.7365577,0.012092792,0.00019347644,0.00023926381,0.00026799305,0.16673844],"genre_scores_gemma":[0.7711808,0.017614035,0.004375664,0.116846986,0.0066976394,0.0002183311,0.0002536843,0.00014631757,0.082666546],"study_design_codex":"not_applicable","study_design_gemma":"qualitative","domain_scores_codex":[0.9135963,0.044208683,0.005317815,0.005143484,0.025621876,0.006111873],"domain_scores_gemma":[0.71849126,0.093647204,0.040137846,0.017452238,0.07927707,0.05099442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.041672923,0.0005395136,0.00071085186,0.004519385,0.0083492305,0.019163262,0.0013600367,0.004557639,0.015288506],"category_scores_gemma":[0.20999646,0.00056393864,0.0003454267,0.0067947675,0.014826745,0.008137088,0.007613251,0.008059148,0.004334281],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019359193,0.00036026954,0.03996618,0.0006082785,0.00010336213,0.0005792014,0.02787977,0.0007469868,0.000505473,0.1364174,0.5490423,0.24359727],"study_design_scores_gemma":[0.00005383259,0.0001152797,0.02023103,0.00088008045,0.000032310356,0.00049940875,0.043594167,0.0006572829,0.000516944,0.06296465,0.87036127,0.00009376518],"about_ca_topic_score_codex":0.0063913604,"about_ca_topic_score_gemma":0.006553105,"teacher_disagreement_score":0.041672923,"about_ca_system_score_codex":0.0116141755,"about_ca_system_score_gemma":0.023391802,"threshold_uncertainty_score":0.22039014},"labels":[],"label_agreement":null},{"id":"W2029939086","doi":"10.1108/17538370910930491","title":"Risk management applied to projects, programs, and portfolios","year":2009,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":112,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Project portfolio management; Risk management; Risk analysis (engineering); Originality; Vulnerability (computing); Computer science; Portfolio; Project management; Process (computing); Process management; Field (mathematics); Management science; Business; Engineering; Systems engineering; Sociology; Qualitative research","score_opus":0.04626625004164048,"score_gpt":0.34289088952436036,"score_spread":0.2966246394827199,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2029939086","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.069006205,0.4742532,0.36081463,0.015036279,0.0017444751,0.0010459193,0.0002817957,0.0003193232,0.07749818],"genre_scores_gemma":[0.50559014,0.33526662,0.14611773,0.0016975724,0.0016177584,0.0008056074,0.000190118,0.00008620946,0.008628263],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98338,0.009043872,0.0018352455,0.00087872066,0.0045170076,0.00034514265],"domain_scores_gemma":[0.95152164,0.034008536,0.008003518,0.0009119582,0.0051373634,0.0004169493],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011715138,0.001253821,0.001524229,0.009164698,0.001193982,0.0068080057,0.001342762,0.0016730074,0.0034018736],"category_scores_gemma":[0.039082374,0.000521641,0.00095798145,0.009233772,0.0028030707,0.0050910483,0.0024109306,0.0016513531,0.00053580786],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013729103,0.00017631914,0.018705787,0.012418244,0.0005037866,0.0013837654,0.007790004,0.020855,0.0017492474,0.1380872,0.00651443,0.79167897],"study_design_scores_gemma":[0.00007182922,0.0014924929,0.04908608,0.034085426,0.0010603712,0.0073892246,0.03810789,0.041864946,0.005806212,0.45634502,0.36420134,0.0004891762],"about_ca_topic_score_codex":0.002344216,"about_ca_topic_score_gemma":0.0027999883,"teacher_disagreement_score":0.011715138,"about_ca_system_score_codex":0.0029493314,"about_ca_system_score_gemma":0.004269337,"threshold_uncertainty_score":0.061956346},"labels":[],"label_agreement":null},{"id":"W2030315361","doi":"10.1002/pmj.21292","title":"An Empirical Identification of Project Management Toolsets and a Comparison among Project Types","year":2012,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":126,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Project management; Identification (biology); Knowledge management; Sample (material); OPM3; Software project management; Engineering management; Project management triangle; Engineering; Process management; Computer science; Business; Software; Software development; Systems engineering","score_opus":0.1356732968373354,"score_gpt":0.4456193325932949,"score_spread":0.30994603575595947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2030315361","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98519486,0.00024348596,0.0070451945,0.00015341406,0.000006695976,0.00020257532,0.00009184241,0.000011174748,0.00705073],"genre_scores_gemma":[0.9900248,0.00023697737,0.008619351,0.000040956147,0.0000055038854,0.00040220236,0.00009881229,0.000012937297,0.0005585177],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9760667,0.011240395,0.0024433893,0.0019621353,0.007187111,0.0011003225],"domain_scores_gemma":[0.8264916,0.11437277,0.028486082,0.008922785,0.0187672,0.0029595396],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015786806,0.00031321723,0.0004467898,0.008778736,0.0015520266,0.0026712182,0.0010638939,0.0007706459,0.0020062956],"category_scores_gemma":[0.13029893,0.0005414934,0.00038189304,0.008206134,0.0022742439,0.0063087214,0.0041739848,0.00091577036,0.00030030124],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036663076,0.0006052097,0.73202145,0.0008305519,0.000062010775,0.00039976268,0.10138187,0.0004655627,0.0047766254,0.008538379,0.0004845904,0.15006731],"study_design_scores_gemma":[0.000029287019,0.00085883203,0.8654459,0.00063952146,0.000028625342,0.0010971976,0.11919644,0.0017748736,0.0016327543,0.004248791,0.005008183,0.000039623785],"about_ca_topic_score_codex":0.0012972251,"about_ca_topic_score_gemma":0.0021907247,"teacher_disagreement_score":0.015786806,"about_ca_system_score_codex":0.0016394188,"about_ca_system_score_gemma":0.0024471937,"threshold_uncertainty_score":0.08348966},"labels":[],"label_agreement":null},{"id":"W2030752214","doi":"10.1108/17538371211235308","title":"The project planning myth in international development","year":2012,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec en Outaouais","funders":"","keywords":"Project management triangle; Project charter; Beneficiary; Project management; Plan (archaeology); Process management; Project planning; Strategic planning; Project plan; Project manager; Extreme project management; Public relations; Mythology; OPM3; Computer science; Business; Management; Marketing; Political science; Economics; Procurement; Finance","score_opus":0.12955383861052577,"score_gpt":0.4130168318960292,"score_spread":0.28346299328550345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2030752214","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051479608,0.008942396,0.099124685,0.17746425,0.00140139,0.00058357033,0.00010705567,0.00020847587,0.6606886],"genre_scores_gemma":[0.94563556,0.0055699293,0.025450837,0.009522626,0.00040359635,0.0013799729,0.00005558451,0.00012406835,0.011857883],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.948059,0.0421037,0.0013644934,0.0022655155,0.0044584232,0.0017489424],"domain_scores_gemma":[0.95223916,0.0330403,0.0034930136,0.005368475,0.0028092188,0.0030499017],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.04167222,0.0006104946,0.0004248591,0.0024086172,0.0064179054,0.01678065,0.002305713,0.0025252958,0.0041262936],"category_scores_gemma":[0.04408763,0.0005543444,0.00041749224,0.0036645648,0.07800882,0.018454937,0.012308262,0.009128242,0.0006440084],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009646235,0.000015885156,0.0004994242,0.00010061899,0.0000027667545,0.000027730928,0.014934357,0.00027914823,0.000021910482,0.9696232,0.003486466,0.010998843],"study_design_scores_gemma":[0.00003089457,0.00008386986,0.0009790445,0.0011421758,0.0000069890984,0.00023337924,0.038168658,0.0008766248,0.00020554615,0.7718752,0.18637255,0.00002510528],"about_ca_topic_score_codex":0.0023824186,"about_ca_topic_score_gemma":0.0014219913,"teacher_disagreement_score":0.04167222,"about_ca_system_score_codex":0.009832066,"about_ca_system_score_gemma":0.020922257,"threshold_uncertainty_score":0.22038639},"labels":[],"label_agreement":null},{"id":"W2031552503","doi":"10.1108/bepam-09-2013-0036","title":"The role of team leadership in achieving LEED certification in a green building project","year":2015,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Centennial College","funders":"","keywords":"Certification; Teamwork; Knowledge management; Engineering management; Green building; Engineering; Process management; Computer science; Management; Architectural engineering","score_opus":0.22331975697514045,"score_gpt":0.34677003735195605,"score_spread":0.1234502803768156,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2031552503","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8571889,0.0009343871,0.04168951,0.006239771,0.00032456822,0.00053308916,0.000026246951,0.00011700792,0.0929465],"genre_scores_gemma":[0.9927626,0.00016466631,0.0052057677,0.000120652614,0.000015904236,0.000070855465,0.0000094200195,0.000008357996,0.0016418366],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.98259336,0.012760089,0.0004333036,0.00047624408,0.0016965411,0.0020404656],"domain_scores_gemma":[0.98322415,0.0059743477,0.0022874328,0.0005953733,0.0026760595,0.0052426136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010602184,0.00025580588,0.00018628172,0.00079533795,0.0036433858,0.0046712286,0.0006907949,0.00081802596,0.0024791213],"category_scores_gemma":[0.013912692,0.00019223997,0.00036070024,0.00041087868,0.0020283773,0.0015474734,0.0041006655,0.0013069535,0.00048177943],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007785564,0.002344208,0.17916122,0.0018192256,0.00023452535,0.0046041114,0.14764385,0.0074787615,0.01305696,0.07487639,0.01570584,0.55229646],"study_design_scores_gemma":[0.00027176458,0.005980529,0.28332183,0.002740199,0.00034405262,0.004761173,0.4362433,0.03632557,0.016048798,0.051288083,0.16231607,0.0003585331],"about_ca_topic_score_codex":0.0013186698,"about_ca_topic_score_gemma":0.002233492,"teacher_disagreement_score":0.010602184,"about_ca_system_score_codex":0.001781478,"about_ca_system_score_gemma":0.0069857915,"threshold_uncertainty_score":0.056070387},"labels":[],"label_agreement":null},{"id":"W2031817052","doi":"10.1016/j.ijproman.2011.03.007","title":"The dynamics of inter-node coordination in social networks: A theoretical perspective and empirical evidence","year":2011,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"King Fahd University of Petroleum and Minerals","keywords":"Variety (cybernetics); Node (physics); Context (archaeology); Interdependence; Consistency (knowledge bases); Social network (sociolinguistics); Task (project management); Computer science; Multinational corporation; Social network analysis; Knowledge management; Operations research; Management science; Engineering; Artificial intelligence; Business; Management; Economics; Sociology","score_opus":0.1454022849643564,"score_gpt":0.42847311710538877,"score_spread":0.28307083214103235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2031817052","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8835273,0.0014918708,0.06640501,0.004933352,0.000044488348,0.00011755374,0.00027315386,0.000070487695,0.043136846],"genre_scores_gemma":[0.9967796,0.00038446975,0.0019828584,0.000035159304,0.000021108712,0.00003347187,0.000039910756,0.0000069682146,0.000716399],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99715185,0.001524131,0.00009536017,0.0005126065,0.0004742816,0.00024172888],"domain_scores_gemma":[0.943497,0.04417339,0.0071015614,0.0021533053,0.0016047915,0.001469958],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040916977,0.0003132913,0.00050413335,0.0015930095,0.0015821423,0.004467254,0.0013946838,0.0016700902,0.005809727],"category_scores_gemma":[0.034390714,0.00057977746,0.00037319708,0.002299061,0.0046473676,0.010054129,0.0017970153,0.0012900234,0.0005357522],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035945908,0.0004366256,0.1307398,0.00047277746,0.00018510464,0.000613938,0.01811963,0.080170974,0.0032414598,0.70089966,0.0038490423,0.060911473],"study_design_scores_gemma":[0.00012362552,0.00023013112,0.07243425,0.00016828212,0.000096964475,0.00062025397,0.018557565,0.223398,0.0010166961,0.673213,0.010046692,0.000094398165],"about_ca_topic_score_codex":0.0049909456,"about_ca_topic_score_gemma":0.003535876,"teacher_disagreement_score":0.005809727,"about_ca_system_score_codex":0.002109454,"about_ca_system_score_gemma":0.0012655829,"threshold_uncertainty_score":0.021639228},"labels":[],"label_agreement":null},{"id":"W2033887096","doi":"10.1108/ci-02-2013-0007","title":"Innovation in construction – before the curtain goes up","year":2013,"lang":"en","type":"article","venue":"Construction Innovation","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"","keywords":"Originality; Innovator; Context (archaeology); Process (computing); Value (mathematics); Obligation; Business; Knowledge management; Engineering; Management science; Process management; Computer science; Sociology; Political science; Entrepreneurship; Qualitative research","score_opus":0.06187988267789171,"score_gpt":0.34135908026317957,"score_spread":0.27947919758528783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2033887096","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17356136,0.16577147,0.11734841,0.20956671,0.005668508,0.0004765509,0.0001720715,0.00035526307,0.32707968],"genre_scores_gemma":[0.9171361,0.031628687,0.017840644,0.009020203,0.0009831829,0.00014106694,0.000065203596,0.00012539994,0.023059605],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9882047,0.0061502988,0.00044077364,0.0010636294,0.0031304767,0.0010100846],"domain_scores_gemma":[0.99123174,0.0054471875,0.0006200065,0.0009999843,0.001174743,0.00052624656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008988142,0.0004802004,0.00082607736,0.0014810453,0.0041963994,0.011295149,0.00096179644,0.0030198826,0.004470875],"category_scores_gemma":[0.009611227,0.00032090838,0.000577593,0.0018142349,0.021377474,0.013057174,0.0068989135,0.0048134946,0.00082970667],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012844341,0.000098352764,0.0062312335,0.0017885527,0.00006357749,0.00068065186,0.041087057,0.0019607802,0.0019061846,0.74147326,0.012791387,0.19179048],"study_design_scores_gemma":[0.000013875261,0.0001991498,0.0051666517,0.0025928682,0.00003285648,0.0008338939,0.037899453,0.0009466018,0.0014721531,0.3383465,0.61241204,0.00008390451],"about_ca_topic_score_codex":0.0031448668,"about_ca_topic_score_gemma":0.0029283464,"teacher_disagreement_score":0.011295149,"about_ca_system_score_codex":0.0062429686,"about_ca_system_score_gemma":0.0068932963,"threshold_uncertainty_score":0.047534406},"labels":[],"label_agreement":null},{"id":"W2034194396","doi":"10.1139/l06-160","title":"Study of information technology development for the Canadian construction industry","year":2007,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"University of British Columbia","keywords":"Construction industry; Business; Government (linguistics); Key (lock); Marketing; Information technology; State (computer science); Industrial organization; Engineering; Construction engineering","score_opus":0.03759741735112053,"score_gpt":0.2786487771639263,"score_spread":0.24105135981280573,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2034194396","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96551627,0.0018149705,0.00036903913,0.0017604001,0.000014320914,0.00016329756,0.0027908362,0.000019902445,0.027551055],"genre_scores_gemma":[0.990225,0.0027346017,0.00041137257,0.0002207661,0.0000066482035,0.000046757963,0.0013595505,0.000005334813,0.004990018],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.998418,0.0000908911,0.00006127111,0.00007918965,0.0009194637,0.00043126196],"domain_scores_gemma":[0.9933037,0.000911006,0.0006781941,0.00009419272,0.003987765,0.0010251751],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010398701,0.00019559282,0.00021487955,0.005089003,0.004859921,0.0024465024,0.0005053272,0.00028232273,0.0028858094],"category_scores_gemma":[0.005527566,0.00025397207,0.00018215597,0.015222366,0.001028133,0.00065506424,0.0008527117,0.0008129962,0.0002446453],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000573436,0.00018946514,0.8636402,0.0003914406,0.000033024637,0.0004199675,0.035814676,0.00064876676,0.00069130515,0.007122045,0.011208184,0.07978361],"study_design_scores_gemma":[0.000005854514,0.000041948297,0.9277918,0.000115129726,0.000013948664,0.000103340775,0.03265434,0.0006024329,0.00030535547,0.00011614639,0.038226616,0.000023154986],"about_ca_topic_score_codex":0.99421126,"about_ca_topic_score_gemma":0.9956642,"teacher_disagreement_score":0.04616292,"about_ca_system_score_codex":0.04616292,"about_ca_system_score_gemma":0.08787667,"threshold_uncertainty_score":0.33493698},"labels":[],"label_agreement":null},{"id":"W2034456251","doi":"10.1061/(asce)co.1943-7862.0000665","title":"Managing the Cost of Power Transmission Projects: Lessons Learned","year":2012,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cost overrun; Delphi method; Cost estimate; Project management triangle; Key (lock); Project management; Project team; Risk analysis (engineering); Engineering management; Work breakdown structure; Delphi; Power transmission; Business; Process management; Computer science; Operations management; Engineering; Knowledge management; Project charter; Power (physics); Systems engineering; Computer security; Construction engineering","score_opus":0.0663122927691005,"score_gpt":0.3339031328265143,"score_spread":0.2675908400574138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2034456251","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5554237,0.020539723,0.07629356,0.2775803,0.0015505158,0.0007604033,0.00025004777,0.00025059542,0.067351185],"genre_scores_gemma":[0.8926297,0.029165782,0.062473882,0.0073271175,0.0003240298,0.0001927462,0.00011321816,0.000079796315,0.0076936968],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9935959,0.0034872154,0.00032001766,0.00036591946,0.0016835707,0.0005473156],"domain_scores_gemma":[0.9677908,0.025205618,0.00077296427,0.0006791873,0.0039996095,0.0015518533],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011235382,0.0010226546,0.00071950076,0.0011887221,0.0021944488,0.0049531604,0.0031157117,0.0028661268,0.0014302492],"category_scores_gemma":[0.024015144,0.0004733864,0.00045591246,0.0013826216,0.0039245547,0.008024461,0.003033608,0.0042771343,0.00026178418],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013514921,0.0013761752,0.015076747,0.005116209,0.00010980158,0.0032108573,0.08781672,0.011863475,0.0025431907,0.0601682,0.034727536,0.7778559],"study_design_scores_gemma":[0.00015514751,0.0017305473,0.021934837,0.011095935,0.00016209218,0.0032559289,0.43301764,0.025366826,0.010224075,0.21040738,0.2822918,0.00035780072],"about_ca_topic_score_codex":0.01063581,"about_ca_topic_score_gemma":0.018976837,"teacher_disagreement_score":0.011235382,"about_ca_system_score_codex":0.0044002444,"about_ca_system_score_gemma":0.008802002,"threshold_uncertainty_score":0.059419096},"labels":[],"label_agreement":null},{"id":"W2034532215","doi":"10.1002/pmj.20191","title":"Identifying Forces Driving PMO Changes","year":2010,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Charter; PMOS logic; Context (archaeology); Transition (genetics); Process management; Process (computing); Organizational structure; Dynamic capabilities; Knowledge management; Business; Computer science; Political science; Engineering; Management; Chemistry; Economics","score_opus":0.09890991065824324,"score_gpt":0.3945477929867517,"score_spread":0.29563788232850846,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2034532215","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97545683,0.00035996322,0.006865709,0.0021754238,0.000051152474,0.00031125138,0.00022330256,0.00005221054,0.01450418],"genre_scores_gemma":[0.99762124,0.00014213522,0.0014262324,0.00006592828,0.0000180914,0.000052888696,0.00008814779,0.000010928865,0.00057438645],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9937164,0.0018280926,0.00050315337,0.0009399456,0.0017543454,0.0012581093],"domain_scores_gemma":[0.96176755,0.022280775,0.009519368,0.0013167119,0.003040157,0.0020754354],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0068330676,0.00042109034,0.00040800092,0.0035853107,0.0027329873,0.005274805,0.0009103093,0.0012077229,0.004263517],"category_scores_gemma":[0.035651695,0.0005312005,0.0004619994,0.0031483953,0.0028783001,0.0037467817,0.0033035355,0.0017371807,0.00043273065],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032663957,0.00024202852,0.8711325,0.00037302327,0.000072310926,0.0011655249,0.0330311,0.0016931655,0.001701097,0.02853,0.0018249464,0.05990783],"study_design_scores_gemma":[0.00004196978,0.00014735849,0.8735843,0.00025853296,0.000051845385,0.00033149688,0.08928383,0.0061472,0.0015021667,0.012429723,0.016154042,0.00006768881],"about_ca_topic_score_codex":0.00694922,"about_ca_topic_score_gemma":0.009288188,"teacher_disagreement_score":0.00694922,"about_ca_system_score_codex":0.0032434436,"about_ca_system_score_gemma":0.004341811,"threshold_uncertainty_score":0.036137104},"labels":[],"label_agreement":null},{"id":"W2036050789","doi":"10.5539/jpl.v1n1p76","title":"Risk Management Assessment for Partnering Projects in the Malaysian Construction Industry","year":2008,"lang":"en","type":"article","venue":"Journal of Politics and Law","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Procurement; Business; Risk management; Integrated project delivery; Quality (philosophy); Process management; Process (computing); Teamwork; Questionnaire; Critical success factor; Operations management; Construction management; Risk analysis (engineering); Marketing; Finance; Engineering; Management; Economics; Computer science","score_opus":0.08840223441949628,"score_gpt":0.37969952284939695,"score_spread":0.29129728842990066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2036050789","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9516039,0.004294101,0.025512606,0.0009746317,0.000034744255,0.00055814185,0.00021311648,0.00007531453,0.016733563],"genre_scores_gemma":[0.9895229,0.0016914101,0.007141485,0.000026951666,0.000007943583,0.00013517306,0.00009893547,0.0000073078522,0.0013679591],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99473816,0.0018105335,0.00061157194,0.00024482235,0.0022803342,0.00031463735],"domain_scores_gemma":[0.98711175,0.00500198,0.0034313807,0.00024020587,0.0036834027,0.0005313757],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007059773,0.0006342321,0.00058117777,0.005881133,0.0012490905,0.0037191776,0.0007306221,0.0011238668,0.0018088113],"category_scores_gemma":[0.013047027,0.00043817778,0.00093535107,0.0032524401,0.0006105696,0.0026009232,0.0023897965,0.0007527163,0.00023536818],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00077178364,0.0011025709,0.5685119,0.0030210053,0.00059837557,0.005159494,0.020641508,0.08207217,0.0039911247,0.013472315,0.003754356,0.2969034],"study_design_scores_gemma":[0.000081147846,0.0036726014,0.6269987,0.0035502163,0.00079824845,0.0047590896,0.10972092,0.20669597,0.0052250107,0.016828854,0.02116288,0.00050628104],"about_ca_topic_score_codex":0.0041460074,"about_ca_topic_score_gemma":0.004710415,"teacher_disagreement_score":0.007059773,"about_ca_system_score_codex":0.0021026204,"about_ca_system_score_gemma":0.0024350595,"threshold_uncertainty_score":0.03733605},"labels":[],"label_agreement":null},{"id":"W2037368786","doi":"10.1061/41109(373)110","title":"An Analytical Framework for Incorporating Projects Supply Chain Problems into Project Plan","year":2010,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Supply chain; Supply chain management; Plan (archaeology); Upstream (networking); Project management; Production (economics); Duration (music); Process management; Project planning; Computer science; Systems engineering; Engineering management; Business; Engineering","score_opus":0.11873394106066382,"score_gpt":0.40389725809591637,"score_spread":0.28516331703525255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2037368786","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023554794,0.00017608813,0.9855642,0.00066855305,0.00003424459,0.00013508822,0.000104736195,0.00006538367,0.010896291],"genre_scores_gemma":[0.16274011,0.0010967439,0.8307689,0.00011101721,0.00009224273,0.00077312824,0.00025780636,0.00008104798,0.0040790737],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99658847,0.0017449674,0.00021741929,0.00030500282,0.0008567985,0.00028734127],"domain_scores_gemma":[0.9943262,0.0034076704,0.00071825046,0.00033609205,0.0009541311,0.00025751506],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006155655,0.0012555143,0.0007015063,0.003729893,0.0013658791,0.0044708475,0.002317868,0.0018302178,0.006028391],"category_scores_gemma":[0.012548849,0.0009504347,0.0015010122,0.004496665,0.0027066525,0.0041585495,0.002506176,0.0020717138,0.0008671919],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000070485953,0.000048814716,0.00052747206,0.000109372166,0.000017313576,0.00015120761,0.00036615896,0.3402297,0.00025180643,0.6365038,0.0015299927,0.020257326],"study_design_scores_gemma":[0.000011460731,0.000066577006,0.00032820235,0.00017893437,0.000023784583,0.000117507494,0.0005150961,0.6089876,0.000288052,0.37048447,0.018956188,0.000042081592],"about_ca_topic_score_codex":0.009026696,"about_ca_topic_score_gemma":0.009013114,"teacher_disagreement_score":0.009026696,"about_ca_system_score_codex":0.004714716,"about_ca_system_score_gemma":0.007863069,"threshold_uncertainty_score":0.03420782},"labels":[],"label_agreement":null},{"id":"W2038286013","doi":"10.1016/j.proeng.2011.07.321","title":"Contractual Risks in Fast-Track Projects","year":2011,"lang":"en","type":"article","venue":"Procedia Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"University of Asia Pacific","keywords":"Rework; Liability; Track (disk drive); Risk analysis (engineering); Damages; Cost overrun; Business; Work (physics); Duration (music); Integrated project delivery; Actuarial science; Computer science; Project management; Finance; Engineering; Construction industry; Construction engineering; Systems engineering","score_opus":0.20785417546417925,"score_gpt":0.34268384510422956,"score_spread":0.1348296696400503,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2038286013","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2225319,0.18595128,0.35228378,0.024712143,0.0006481433,0.0010895552,0.00069960335,0.0001860929,0.21189749],"genre_scores_gemma":[0.8566075,0.07596578,0.05616957,0.0013344655,0.00028321403,0.00058966444,0.000333821,0.000056745645,0.008659249],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9727005,0.012019846,0.0024081327,0.0012592799,0.010554248,0.0010580389],"domain_scores_gemma":[0.9563644,0.028298942,0.009103283,0.0015456213,0.0040113563,0.000676444],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021210149,0.00047646023,0.0004815347,0.0027867574,0.002433795,0.006385528,0.0017269885,0.0026167873,0.0024191905],"category_scores_gemma":[0.033946544,0.00055525947,0.0006469443,0.003960801,0.0041109715,0.0061325994,0.0032721797,0.0021222935,0.00035577288],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000096944656,0.00013820818,0.01293101,0.002696874,0.0000715946,0.0017966493,0.0076771127,0.021351222,0.00075015397,0.686695,0.007894966,0.2579004],"study_design_scores_gemma":[0.00003475655,0.00030961755,0.020009838,0.010752544,0.00014942914,0.004067872,0.019799788,0.02392652,0.0024648954,0.49058563,0.4276677,0.00023147368],"about_ca_topic_score_codex":0.006447369,"about_ca_topic_score_gemma":0.003310007,"teacher_disagreement_score":0.021210149,"about_ca_system_score_codex":0.003741837,"about_ca_system_score_gemma":0.0071828067,"threshold_uncertainty_score":0.11217135},"labels":[],"label_agreement":null},{"id":"W2038690127","doi":"10.6106/jcepm.2013.3.2.001","title":"Front End Planning Tool (FEPT) Based on an Electronic Process Management","year":2013,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Front (military); Front and back ends; Workflow; Process (computing); Process management; Business; Computer science; Operations management; Systems engineering; Engineering; Mechanical engineering","score_opus":0.019476972958701506,"score_gpt":0.3004965696105166,"score_spread":0.2810195966518151,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2038690127","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0051707695,0.000056729867,0.9650243,0.000090266716,0.0000615075,0.00051708065,0.0006452797,0.022590108,0.0058440305],"genre_scores_gemma":[0.047477737,0.00011259558,0.9444553,0.00009227476,0.000019935957,0.00078059535,0.0014672402,0.00090949365,0.0046847714],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997965,0.00047216803,0.0003158215,0.00038901207,0.0007332636,0.00012465985],"domain_scores_gemma":[0.99344134,0.004205213,0.00041759232,0.00094580214,0.0008260801,0.00016398112],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033365057,0.0013087615,0.0006573231,0.0020512734,0.00067491335,0.0022317285,0.0016160859,0.0010688163,0.016764712],"category_scores_gemma":[0.0078096977,0.00071957824,0.0009815983,0.0012334707,0.0007492504,0.0023431168,0.0015870883,0.0014125973,0.003518463],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010467945,0.0010638607,0.0039663482,0.0019371646,0.00013175205,0.0012028278,0.0022413651,0.055195663,0.037318308,0.04860149,0.026109017,0.82118535],"study_design_scores_gemma":[0.00071255676,0.0012234446,0.005510307,0.00084943033,0.00025601464,0.0021620798,0.0006421708,0.54218346,0.10405007,0.03936359,0.30260232,0.00044460196],"about_ca_topic_score_codex":0.0020113268,"about_ca_topic_score_gemma":0.0016628553,"teacher_disagreement_score":0.016764712,"about_ca_system_score_codex":0.0006072955,"about_ca_system_score_gemma":0.002068842,"threshold_uncertainty_score":0.0560835},"labels":[],"label_agreement":null},{"id":"W2039046916","doi":"10.5539/ibr.v8n1p117","title":"The Role of Organizational DNA in Improving Organizational Performance: A Study on the Industrial Companies in Egypt","year":2014,"lang":"en","type":"article","venue":"International Business Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Organizational performance; Business; Organizational commitment; Knowledge management; Organizational learning; Organizational structure; Competitive advantage; Organization development; Economic shortage; Marketing; Management; Computer science; Economics","score_opus":0.13438803372544406,"score_gpt":0.39506698455101114,"score_spread":0.2606789508255671,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2039046916","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9994999,0.00007388927,0.000017210805,0.000073058036,6.060763e-7,0.0000069522616,0.0000051004554,2.5816203e-7,0.0003229694],"genre_scores_gemma":[0.9989749,0.00022307354,0.000058447215,0.000106701955,0.000002179763,0.0000072591997,0.000011444331,6.5898666e-7,0.00061527063],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99934167,0.00020906393,0.00003258278,0.000063172454,0.0001251372,0.00022833546],"domain_scores_gemma":[0.9984124,0.00044101698,0.0005296096,0.000062781386,0.00018244646,0.00037176473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013023533,0.00023368534,0.00026541777,0.0010314942,0.002300698,0.001666465,0.0004944425,0.0006125707,0.0019429261],"category_scores_gemma":[0.0013999062,0.00025298263,0.00017096747,0.0011771853,0.0011150052,0.0008450928,0.0008773892,0.00063771184,0.00023736896],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016436075,0.0019425149,0.6820649,0.00044540406,0.00004179083,0.0027667799,0.26301906,0.0002089199,0.0024717278,0.0009891914,0.00073322153,0.045152023],"study_design_scores_gemma":[0.000015302778,0.00059316895,0.6476624,0.00014791555,0.000029780293,0.00044003292,0.34574208,0.00014716278,0.0005709473,0.00014082858,0.0044913087,0.00001911587],"about_ca_topic_score_codex":0.010177859,"about_ca_topic_score_gemma":0.023589462,"teacher_disagreement_score":0.010177859,"about_ca_system_score_codex":0.0022601786,"about_ca_system_score_gemma":0.0024555987,"threshold_uncertainty_score":0.020237207},"labels":[],"label_agreement":null},{"id":"W2039365816","doi":"10.1139/l03-063","title":"Risk and benefits associated with international construction–consulting joint ventures in the English-speaking Caribbean","year":2003,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Business; Position (finance); Marketing; Cash flow; Work (physics); Joint (building); Competitive advantage; Market share; Finance; Engineering","score_opus":0.02558203542712307,"score_gpt":0.23125414166887248,"score_spread":0.20567210624174942,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2039365816","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9969285,0.00015893963,0.000048454945,0.0001777276,0.0000017952223,0.000009685916,0.000018399318,6.426722e-7,0.002655773],"genre_scores_gemma":[0.99957246,0.00010619255,0.00003236118,0.0000114924105,0.000003625495,0.0000050023577,0.000018619012,5.6678374e-7,0.00024975807],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9972367,0.00084100245,0.0002127018,0.000089646965,0.0009589119,0.00066106697],"domain_scores_gemma":[0.9799383,0.005607645,0.0080450075,0.00032291407,0.0024253565,0.0036607785],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014382681,0.00019253291,0.00018788231,0.0014278962,0.0011863111,0.0017031449,0.00022096634,0.00040060133,0.0025554553],"category_scores_gemma":[0.01876456,0.00009672446,0.00022537507,0.0013264822,0.00075161323,0.0003798532,0.0014916927,0.0006578564,0.00014278758],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015184167,0.0001611607,0.98209584,0.000025655438,0.000026096208,0.00048228886,0.0032036316,0.00018115448,0.00018184165,0.0004238411,0.00022240981,0.012844239],"study_design_scores_gemma":[0.0000072358016,0.000085838445,0.98335385,0.000045062876,0.000021773534,0.0003876519,0.014022669,0.00041417638,0.00012240706,0.0002266711,0.0012979185,0.00001468216],"about_ca_topic_score_codex":0.03553579,"about_ca_topic_score_gemma":0.06516014,"teacher_disagreement_score":0.03553579,"about_ca_system_score_codex":0.0014672211,"about_ca_system_score_gemma":0.001988867,"threshold_uncertainty_score":0.07065791},"labels":[],"label_agreement":null},{"id":"W2040755658","doi":"10.1007/s12205-010-0251-0","title":"Scheduling decisions and their dynamic consequences on construction performance","year":2010,"lang":"en","type":"article","venue":"KSCE Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":17,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Scheduling (production processes); Computer science; Operations research; Operations management; Engineering","score_opus":0.027608159619883374,"score_gpt":0.2861498568559307,"score_spread":0.2585416972360473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2040755658","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9894075,0.00016124827,0.004829297,0.00046176204,0.000027349364,0.00001723852,0.00018414253,0.00002964745,0.0048818286],"genre_scores_gemma":[0.9992162,0.000042901545,0.00027245254,0.000011209321,0.0000062473873,0.00000442097,0.000036069367,0.000005175415,0.00040538493],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9990013,0.00039409054,0.00005071737,0.000115882176,0.00016470022,0.00027326244],"domain_scores_gemma":[0.9836954,0.012323943,0.0019665088,0.00031055158,0.0007209181,0.0009826774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033517375,0.00037805774,0.00037438443,0.00084381225,0.0005091861,0.002776397,0.00057158695,0.0010673983,0.0044985143],"category_scores_gemma":[0.015612091,0.00044096136,0.00035943222,0.0010214866,0.00071552565,0.0011951101,0.0005391185,0.0011779773,0.0004962074],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003044582,0.0012726043,0.15074854,0.00008931337,0.00028185616,0.0006740435,0.00051983097,0.7580825,0.012874538,0.022524273,0.0016374259,0.048250534],"study_design_scores_gemma":[0.00018302187,0.00083878473,0.2881488,0.00002879867,0.00017227864,0.00015223805,0.0017366321,0.67144364,0.0028798173,0.032183018,0.0021004404,0.00013256942],"about_ca_topic_score_codex":0.005115818,"about_ca_topic_score_gemma":0.0064051505,"teacher_disagreement_score":0.005115818,"about_ca_system_score_codex":0.001635022,"about_ca_system_score_gemma":0.0011654383,"threshold_uncertainty_score":0.017725885},"labels":[],"label_agreement":null},{"id":"W2042691266","doi":"10.1016/j.jom.2009.09.001","title":"Understanding project champions’ ability to gain intra‐organizational commitment for environmental projects","year":2009,"lang":"en","type":"article","venue":"Journal of Operations Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":198,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Tellabs (Canada)","funders":"","keywords":"Champion; Business; Project management; Marketing; OPM3; Enabling; Organizational commitment; Knowledge management; Process management; Project management triangle; Management; Psychology; Computer science; Economics; Political science","score_opus":0.19292734056840619,"score_gpt":0.3723990175334321,"score_spread":0.1794716769650259,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2042691266","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9983664,0.000011681833,0.00018564802,0.000063358726,0.0000012919115,0.000005371145,0.000003381319,0.0000022013871,0.0013607049],"genre_scores_gemma":[0.99960524,0.000013830095,0.00011588446,0.0000098896935,0.0000012738784,0.0000082428105,0.000009250439,0.0000011213102,0.00023519379],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99831617,0.00094996113,0.000066934976,0.00011464648,0.00035127316,0.00020105125],"domain_scores_gemma":[0.9797974,0.009096623,0.005771225,0.00069323747,0.0019221379,0.0027192384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038867947,0.00018295528,0.00015978939,0.00089178333,0.00055564224,0.0019352988,0.0003750156,0.00059728156,0.003157389],"category_scores_gemma":[0.01817948,0.0002401187,0.00016838634,0.0003716787,0.0006467209,0.0010103389,0.0012880659,0.000854688,0.00034929736],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008925617,0.00050166325,0.94731075,0.000037508453,0.000058260117,0.00015212003,0.018114887,0.0006074417,0.0020919458,0.0010145463,0.000406638,0.02961492],"study_design_scores_gemma":[0.000007252392,0.0002316552,0.97315276,0.00003776067,0.000016571248,0.00010535623,0.02176631,0.0023323065,0.00065854244,0.00049920747,0.0011729023,0.000019460897],"about_ca_topic_score_codex":0.001767453,"about_ca_topic_score_gemma":0.0031686,"teacher_disagreement_score":0.0038867947,"about_ca_system_score_codex":0.0004588217,"about_ca_system_score_gemma":0.00051046733,"threshold_uncertainty_score":0.020555556},"labels":[],"label_agreement":null},{"id":"W2045088315","doi":"10.1016/j.ijproman.2007.08.009","title":"Organisational project management: An historical approach to the study of PMOs","year":2007,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":112,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Project management; Context (archaeology); Process management; PMOS logic; Knowledge management; Grounded theory; Positivism; Process (computing); Project charter; Engineering; Project management triangle; Business; Engineering management; Sociology; Political science; Computer science; Systems engineering; Qualitative research; Social science; Geography","score_opus":0.12428206016706633,"score_gpt":0.40852430653401345,"score_spread":0.2842422463669471,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045088315","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0833927,0.16854928,0.19688645,0.047231313,0.0023669486,0.00044859454,0.0003119693,0.00017650034,0.5006363],"genre_scores_gemma":[0.84082454,0.08386396,0.0413931,0.00445284,0.0018860713,0.0006786869,0.00014294313,0.00015751903,0.026600307],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9945393,0.0034065354,0.00033380772,0.00046636566,0.0008136308,0.000440262],"domain_scores_gemma":[0.98977697,0.0072878352,0.00081604044,0.00043022446,0.0010508718,0.0006382086],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0066981562,0.00060438324,0.0004069824,0.006614353,0.004547484,0.010120322,0.0017317301,0.0035505246,0.004023324],"category_scores_gemma":[0.014329385,0.00054967665,0.0003656538,0.008351852,0.018932898,0.009057455,0.0043777516,0.0040768157,0.0005495908],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019878142,0.000052274023,0.0012351167,0.00030221662,0.0000054591014,0.00020199275,0.012627799,0.0007976171,0.00016564809,0.94961655,0.002341428,0.032634065],"study_design_scores_gemma":[0.0000126426685,0.00014178109,0.0064667338,0.002242882,0.000012017521,0.0008447388,0.01639528,0.00234566,0.000638853,0.28310788,0.687733,0.000058498197],"about_ca_topic_score_codex":0.0061139865,"about_ca_topic_score_gemma":0.005375749,"teacher_disagreement_score":0.010120322,"about_ca_system_score_codex":0.009024615,"about_ca_system_score_gemma":0.0067190933,"threshold_uncertainty_score":0.0654785},"labels":[],"label_agreement":null},{"id":"W2046162936","doi":"10.1061/41109(373)103","title":"Top 10 Areas for Construction Productivity Improvement on Alberta Oil and Gas Construction Projects","year":2010,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Constructability; Prefabrication; Productivity; Construction management; Petroleum industry; Construction industry; Integrated project delivery; Project management; Government (linguistics); Business; Engineering; Construction engineering; Engineering management; Civil engineering; Systems engineering","score_opus":0.03906087341923817,"score_gpt":0.3158540001598693,"score_spread":0.27679312674063117,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2046162936","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96524465,0.0011705313,0.0021349366,0.001335427,0.000023495648,0.00016238024,0.00064215343,0.00018021208,0.02910624],"genre_scores_gemma":[0.99089116,0.0008046776,0.00338991,0.000055231074,0.000014080384,0.000060258342,0.0004682968,0.00001555545,0.00430081],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9965306,0.0005129868,0.00012478614,0.0001279375,0.0018491448,0.0008546278],"domain_scores_gemma":[0.9942451,0.0009770297,0.0011007125,0.0001262835,0.0023536829,0.0011971691],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019348365,0.00035393424,0.00025457767,0.003489022,0.0014403961,0.0018343638,0.0005550711,0.0004739286,0.004860131],"category_scores_gemma":[0.0043442477,0.00018459349,0.00026087672,0.0035124898,0.00043562785,0.00036206242,0.0009923994,0.0003331679,0.00087789353],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039165598,0.00041727963,0.5843826,0.0007826344,0.000060722945,0.00043953885,0.0028604164,0.0035990246,0.007577191,0.0018274131,0.012009662,0.38565186],"study_design_scores_gemma":[0.000013464124,0.00013875718,0.98245263,0.00007484118,0.000027063626,0.00011639827,0.004353088,0.001891467,0.0013505121,0.00037306282,0.009191965,0.000016708611],"about_ca_topic_score_codex":0.047038477,"about_ca_topic_score_gemma":0.1332051,"teacher_disagreement_score":0.9529615,"about_ca_system_score_codex":0.0036488287,"about_ca_system_score_gemma":0.008192477,"threshold_uncertainty_score":0.09352934},"labels":[],"label_agreement":null},{"id":"W2047021120","doi":"10.1139/l00-111","title":"Construction bid price evaluation","year":2001,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bidding; Bid price; Bid shading; National best bid and offer; Real-time bidding; Unique bid auction; Proxy bid; Computer science; Unit price; Operations research; Distribution (mathematics); Business; Microeconomics; Economics; Finance; Mathematics","score_opus":0.05669594016804522,"score_gpt":0.2986920816774725,"score_spread":0.2419961415094273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2047021120","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11316282,0.00066009356,0.6884575,0.0007908162,0.00073404214,0.0075357268,0.002426919,0.0019806311,0.18425146],"genre_scores_gemma":[0.6696853,0.00035510026,0.28034726,0.00019490987,0.00021064914,0.003604088,0.0030060916,0.00095874607,0.04163784],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.96159613,0.015754255,0.002518758,0.0016938217,0.017181812,0.0012551621],"domain_scores_gemma":[0.9282551,0.023423083,0.004340155,0.007821415,0.034355346,0.0018049097],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.031613015,0.00076679647,0.0011845705,0.00679209,0.0017130873,0.004501385,0.0020821225,0.0007947508,0.028574195],"category_scores_gemma":[0.09393804,0.00045186572,0.0007865679,0.005660848,0.0011193654,0.0030570854,0.0025626426,0.0014280941,0.0059217345],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014302966,0.00054941984,0.02009883,0.00046370967,0.00011019868,0.00017703846,0.0016261091,0.011781636,0.0027646977,0.09586942,0.036998447,0.82813025],"study_design_scores_gemma":[0.0008256688,0.0038022734,0.10726075,0.0005313961,0.00032739344,0.0020790517,0.0063768527,0.30692875,0.03247842,0.15044333,0.38820475,0.0007412723],"about_ca_topic_score_codex":0.0025647713,"about_ca_topic_score_gemma":0.0028425828,"teacher_disagreement_score":0.031613015,"about_ca_system_score_codex":0.003362473,"about_ca_system_score_gemma":0.004137855,"threshold_uncertainty_score":0.16718757},"labels":[],"label_agreement":null},{"id":"W2049316940","doi":"10.1108/01443570410569047","title":"The role of project target clarity in an uncertain project environment","year":2004,"lang":"en","type":"article","venue":"International Journal of Operations & Production Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":89,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Teamwork; CLARITY; Process management; New product development; Business; Project management; Project planning; Outcome (game theory); Knowledge management; Project team; Product (mathematics); Computer science; Marketing; Systems engineering; Engineering; Economics; Management","score_opus":0.05715401276147075,"score_gpt":0.3781533940436748,"score_spread":0.32099938128220407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2049316940","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96492976,0.00014767343,0.029812448,0.00029984018,0.0000055413802,0.00005687072,0.000045346525,0.00002126819,0.004681285],"genre_scores_gemma":[0.99792457,0.00003395513,0.0018998818,0.000009857354,0.0000020872424,0.000015409434,0.00001371333,0.000003513883,0.00009689571],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9889023,0.006788939,0.00042267318,0.0005723853,0.0023500654,0.00096363726],"domain_scores_gemma":[0.8850992,0.08195077,0.024155699,0.002404773,0.0038113913,0.002578202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011004667,0.00031885869,0.00050137495,0.0011296221,0.0014812512,0.0039571305,0.000748095,0.000901838,0.0010583351],"category_scores_gemma":[0.05953882,0.0005695329,0.00035892165,0.0010577983,0.0021164254,0.0028416947,0.0035828636,0.0011531613,0.000120761055],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011176053,0.00064511254,0.65927875,0.00044169126,0.00032700418,0.0014246579,0.015003084,0.19082029,0.005725984,0.042712092,0.00077593786,0.08172779],"study_design_scores_gemma":[0.00008244711,0.0014207582,0.6686783,0.00024255767,0.00018490477,0.00070924585,0.017074466,0.24886897,0.0033604337,0.055557493,0.0035703685,0.0002500719],"about_ca_topic_score_codex":0.004547417,"about_ca_topic_score_gemma":0.0056042857,"teacher_disagreement_score":0.011004667,"about_ca_system_score_codex":0.0020787625,"about_ca_system_score_gemma":0.0020245006,"threshold_uncertainty_score":0.05819899},"labels":[],"label_agreement":null},{"id":"W2049514938","doi":"10.1061/41109(373)108","title":"A Framework for Evaluating the Effect of Fast-Tracking Techniques on Project Performance","year":2010,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Duration (music); Tracking (education); Outcome (game theory); Computer science; Project management; Risk analysis (engineering); Systems engineering; Engineering; Business","score_opus":0.13420263777505206,"score_gpt":0.4782363346565143,"score_spread":0.34403369688146224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2049514938","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10132752,0.0011569912,0.8690132,0.00066726224,0.00007357164,0.0045878226,0.0010992569,0.00041679104,0.021657651],"genre_scores_gemma":[0.59121126,0.0011913304,0.39984882,0.00013997924,0.000027491511,0.0058554662,0.00047778874,0.000060158407,0.001187619],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.95081097,0.031123204,0.0023534554,0.0020554324,0.012161694,0.0014951172],"domain_scores_gemma":[0.9340211,0.048774704,0.008250106,0.0031535132,0.00517313,0.00062733906],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.04555097,0.0031463979,0.0017555159,0.0061125928,0.0011798757,0.0052148323,0.0029996391,0.0030986508,0.003224102],"category_scores_gemma":[0.06735075,0.00081033487,0.0027793664,0.0036367192,0.0040886113,0.0054723932,0.0033500064,0.0022814188,0.0005409482],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00072773785,0.0021785805,0.013929404,0.0014050133,0.00046984263,0.00012600704,0.0007022692,0.71886146,0.0074793254,0.16394642,0.0012815791,0.08889236],"study_design_scores_gemma":[0.00038100817,0.020682815,0.028915817,0.0010308309,0.0004646104,0.0002681034,0.0021698582,0.8035873,0.012041806,0.1204818,0.009452123,0.00052395416],"about_ca_topic_score_codex":0.006894981,"about_ca_topic_score_gemma":0.0035637128,"teacher_disagreement_score":0.04555097,"about_ca_system_score_codex":0.0057214783,"about_ca_system_score_gemma":0.006861425,"threshold_uncertainty_score":0.24089944},"labels":[],"label_agreement":null},{"id":"W2049593899","doi":"10.5539/emr.v4n1p82","title":"Planning the Decision Making Process: A Multiple Case Study","year":2015,"lang":"en","type":"article","venue":"Engineering Management Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Process (computing); Decision engineering; Decision analysis; Business decision mapping; Decision-making; R-CAST; Autonomy; Decision fatigue; Evidential reasoning approach; Decision field theory; Evidential decision theory; Management science; Decision maker; Perspective (graphical); Computer science; Decision support system; Operations management; Engineering; Economics; Artificial intelligence; Political science","score_opus":0.3492893760810088,"score_gpt":0.515882419038805,"score_spread":0.16659304295779626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2049593899","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.848431,0.000942915,0.11122174,0.00409816,0.000100551115,0.003506603,0.00038150797,0.000050789396,0.031266727],"genre_scores_gemma":[0.9312222,0.00056897564,0.06436039,0.00019787656,0.000025811058,0.0011436697,0.00008410282,0.00001567623,0.0023811245],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.98442626,0.012454291,0.00045435544,0.0005296262,0.0012599595,0.00087541685],"domain_scores_gemma":[0.9611518,0.03345857,0.0017132786,0.0010740551,0.0012874687,0.0013147718],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013952516,0.00068556546,0.00059972383,0.001949804,0.0046113054,0.0042452584,0.002105546,0.0031803332,0.0048137116],"category_scores_gemma":[0.019731207,0.00057787716,0.001107903,0.003096342,0.0029250237,0.004297388,0.0027556887,0.0030076883,0.00037166453],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0027797318,0.012975023,0.0714039,0.0027214019,0.0005164695,0.053741153,0.16486609,0.15543653,0.0062744813,0.2923769,0.012400286,0.22450814],"study_design_scores_gemma":[0.0013461807,0.006699264,0.02854623,0.0025252542,0.0004503201,0.015907679,0.30204204,0.32255447,0.019504903,0.14063904,0.15907685,0.0007077352],"about_ca_topic_score_codex":0.0049690446,"about_ca_topic_score_gemma":0.008123806,"teacher_disagreement_score":0.013952516,"about_ca_system_score_codex":0.0052453936,"about_ca_system_score_gemma":0.004067226,"threshold_uncertainty_score":0.07378882},"labels":[],"label_agreement":null},{"id":"W2051233804","doi":"10.1139/l04-068","title":"Developing a standard methodology for measuring and classifying construction field rework","year":2004,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":117,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Syncrude","keywords":"Rework; Schedule; Field (mathematics); Engineering; Standardization; Construction industry; Reliability engineering; Computer science; Construction engineering","score_opus":0.18239011833437654,"score_gpt":0.3415066726678087,"score_spread":0.15911655433343216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2051233804","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07276981,0.00028951696,0.8904983,0.0004609642,0.00013459142,0.015266129,0.00442902,0.0009499987,0.015201616],"genre_scores_gemma":[0.0707567,0.00021151725,0.91118413,0.00006294528,0.000021265365,0.013014136,0.0030293001,0.00005961073,0.0016603153],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.95152867,0.013803611,0.009955723,0.0031877032,0.020373195,0.0011510592],"domain_scores_gemma":[0.9221419,0.022029757,0.01061073,0.008447314,0.0359225,0.00084791135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.034844514,0.0012148683,0.0012325065,0.018920356,0.0026181468,0.0045125913,0.0032082163,0.0011751446,0.0021242534],"category_scores_gemma":[0.0553573,0.000687456,0.0010983784,0.017549707,0.0024790755,0.0029976303,0.0032305154,0.0017687458,0.0007499226],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018095029,0.00089056534,0.17934969,0.0022386867,0.00017754875,0.00017953664,0.014169934,0.009411373,0.009373028,0.029474275,0.011549021,0.74300545],"study_design_scores_gemma":[0.0002856485,0.00206437,0.53220737,0.0022930785,0.00028524586,0.0008652796,0.06708452,0.08392658,0.054402646,0.058478873,0.19726744,0.00083898887],"about_ca_topic_score_codex":0.031335,"about_ca_topic_score_gemma":0.06858896,"teacher_disagreement_score":0.034844514,"about_ca_system_score_codex":0.010048056,"about_ca_system_score_gemma":0.017803123,"threshold_uncertainty_score":0.18427765},"labels":[],"label_agreement":null},{"id":"W2051469667","doi":"10.1061/(asce)0733-9364(2003)129:3(351)","title":"Closure to “Benefits of Constructability on Construction Projects” by George Jergeas and John Van der Put","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"TransCanada (Canada); University of Calgary","funders":"","keywords":"Constructability; George (robot); Closure (psychology); Engineering; Sociology; Political science; Art; Art history; Structural engineering; Law","score_opus":0.02186456095687852,"score_gpt":0.26626213659769243,"score_spread":0.2443975756408139,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2051469667","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020203466,0.033702906,0.06474138,0.549936,0.0206866,0.00006593191,0.00025691427,0.00019235037,0.31021452],"genre_scores_gemma":[0.78633803,0.01670361,0.017104855,0.044620093,0.021619428,0.00028660172,0.0002413875,0.00077703194,0.112308934],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99489415,0.0023424735,0.0002465817,0.00069836766,0.0013880412,0.00043053075],"domain_scores_gemma":[0.9807328,0.012788408,0.0009339119,0.0016920994,0.0032624204,0.000590367],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004865009,0.0006506847,0.0008254825,0.0015572328,0.0032901932,0.005685309,0.0014987513,0.004871736,0.010925547],"category_scores_gemma":[0.040579114,0.00054751814,0.0007904511,0.0024617657,0.011867941,0.011994596,0.005415975,0.008752087,0.0015192102],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035396235,0.000020740754,0.000145049,0.000049579747,0.0000090178955,0.000034748904,0.00085295213,0.0008421668,0.00005391926,0.92791194,0.05658585,0.013458511],"study_design_scores_gemma":[0.000012354575,0.000008968887,0.00026617246,0.000107432075,0.000007834718,0.000027390488,0.00034543438,0.0007087218,0.00010103509,0.86739534,0.13100162,0.000017694665],"about_ca_topic_score_codex":0.009891897,"about_ca_topic_score_gemma":0.007520647,"teacher_disagreement_score":0.010925547,"about_ca_system_score_codex":0.004131478,"about_ca_system_score_gemma":0.0025857354,"threshold_uncertainty_score":0.036549628},"labels":[],"label_agreement":null},{"id":"W2051526268","doi":"10.1016/j.ijproman.2015.01.006","title":"Does Agile work? — A quantitative analysis of agile project success","year":2015,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":810,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Humber College","funders":"","keywords":"Agile software development; Process management; Project management; Stakeholder; Knowledge management; Quality (philosophy); Project management triangle; Business; Moderation; Engineering; Management science; Computer science; Systems engineering; Political science; Public relations","score_opus":0.16176209108870696,"score_gpt":0.4557616298500268,"score_spread":0.2939995387613198,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2051526268","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9925016,0.00005766744,0.0022705458,0.00014484962,0.000009410836,0.00008710721,0.00039815565,0.000031768872,0.004498844],"genre_scores_gemma":[0.9970796,0.000042601692,0.0017494842,0.000028328415,0.000009592189,0.00017004361,0.00026215037,0.000017230772,0.00064102805],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9905177,0.0051130066,0.0008268084,0.00045120472,0.002657276,0.0004340406],"domain_scores_gemma":[0.88855815,0.07729278,0.0141311055,0.0025298698,0.013823177,0.0036650049],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008471126,0.0002464802,0.00027975772,0.0033602398,0.0008802308,0.0022600375,0.00057880435,0.0004902983,0.0017692181],"category_scores_gemma":[0.04250589,0.0002503748,0.00027671875,0.0032079802,0.0010201732,0.0021272323,0.001517765,0.0009861332,0.0007014768],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006303355,0.0009982943,0.8425059,0.00036316516,0.00019874888,0.00027028145,0.035817645,0.0014164497,0.005969781,0.0029726154,0.0024808452,0.10637582],"study_design_scores_gemma":[0.00003040248,0.0017824676,0.94769996,0.000114740156,0.000053240336,0.00038201062,0.034205124,0.0056156134,0.002402565,0.0012528126,0.0063713114,0.0000896732],"about_ca_topic_score_codex":0.0012054179,"about_ca_topic_score_gemma":0.0017379094,"teacher_disagreement_score":0.008471126,"about_ca_system_score_codex":0.00096277613,"about_ca_system_score_gemma":0.0011169168,"threshold_uncertainty_score":0.044800162},"labels":[],"label_agreement":null},{"id":"W2051956890","doi":"10.2118/86587-ms","title":"HSE And SD Assessments - Integrating HSE and Sustainable Development into Projects Right from the Outset","year":2004,"lang":"en","type":"article","venue":"SPE International Conference on Health, Safety, and Environment in Oil and Gas Exploration and Production","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Shell (Canada)","funders":"","keywords":"Process (computing); Sustainable development; Process management; Order (exchange); Computer science; Simple (philosophy); Risk analysis (engineering); Engineering management; Systems engineering; Engineering; Business; Political science","score_opus":0.09393303210171461,"score_gpt":0.35213792070001504,"score_spread":0.25820488859830043,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2051956890","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14885157,0.0007577509,0.7294921,0.006863447,0.00020791126,0.002199014,0.00050237786,0.003692499,0.10743333],"genre_scores_gemma":[0.7108551,0.00037139832,0.27776036,0.0002585689,0.000057123216,0.00048748255,0.00034058554,0.0002150071,0.0096544195],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.97202456,0.016621133,0.0016652183,0.0011837436,0.007639927,0.0008654008],"domain_scores_gemma":[0.9659074,0.012596923,0.0032696873,0.0043738773,0.011961889,0.0018903179],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.027388364,0.0007546641,0.0006691464,0.0036367038,0.0017567588,0.0065564304,0.001076312,0.0009877397,0.00611352],"category_scores_gemma":[0.04501256,0.00056441023,0.00047036776,0.0024756442,0.0027472118,0.0074548656,0.0073639257,0.0018928618,0.0010560785],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030679855,0.00054212875,0.022789162,0.0006405022,0.000055637734,0.0003628413,0.010138349,0.03449929,0.0056108935,0.05616894,0.005959579,0.8629259],"study_design_scores_gemma":[0.00018457745,0.0021596348,0.092682116,0.0026320731,0.000109635046,0.000671233,0.043569684,0.16873255,0.034986403,0.42087236,0.23295219,0.000447533],"about_ca_topic_score_codex":0.004942952,"about_ca_topic_score_gemma":0.007645961,"teacher_disagreement_score":0.027388364,"about_ca_system_score_codex":0.0032204587,"about_ca_system_score_gemma":0.007606593,"threshold_uncertainty_score":0.14484525},"labels":[],"label_agreement":null},{"id":"W2052426618","doi":"10.5539/mas.v7n8p78","title":"Analysis of Cost Overrun Factors for Small Scale Construction Projects in Malaysia Using PLS-SEM Method","year":2013,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":60,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universiti Tun Hussein Onn Malaysia","keywords":"Cost overrun; Structural equation modeling; Scale (ratio); Variance (accounting); Multivariate statistics; Operations management; Questionnaire; Business; Computer science; Statistics; Construction industry; Mathematics; Engineering; Construction engineering; Accounting; Geography","score_opus":0.1472763951030907,"score_gpt":0.3822230107428794,"score_spread":0.2349466156397887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2052426618","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9931954,0.000055481283,0.0051672445,0.00007309059,0.0000027627564,0.00009774465,0.00012948643,0.000017275168,0.0012615711],"genre_scores_gemma":[0.99428153,0.000097356904,0.004927373,0.000007792255,0.000001750702,0.000075401964,0.0001609301,0.0000068025574,0.00044106893],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99742633,0.00093730935,0.00021919333,0.00023094579,0.0010024584,0.00018374521],"domain_scores_gemma":[0.9932857,0.0034880938,0.001472606,0.000246515,0.0013541309,0.0001529113],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040772357,0.00067624456,0.00037345936,0.0020557635,0.00048949185,0.0013073221,0.0003043358,0.00031592717,0.0014796512],"category_scores_gemma":[0.007639484,0.00038244593,0.0006395397,0.0022858493,0.00049656414,0.0010078767,0.00059442385,0.00044574033,0.00014332504],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002404125,0.0004948166,0.80436325,0.00067084713,0.0002432042,0.00070147327,0.010341302,0.029499356,0.0055669043,0.0029159703,0.0008020349,0.14416043],"study_design_scores_gemma":[0.00001556424,0.0005417401,0.905888,0.0002235714,0.00010546292,0.0002731772,0.017884018,0.067123495,0.0036559545,0.0015212543,0.0026945402,0.00007314321],"about_ca_topic_score_codex":0.005510562,"about_ca_topic_score_gemma":0.008761375,"teacher_disagreement_score":0.005510562,"about_ca_system_score_codex":0.0015954784,"about_ca_system_score_gemma":0.002397893,"threshold_uncertainty_score":0.021562755},"labels":[],"label_agreement":null},{"id":"W2053272969","doi":"10.1061/(asce)0733-9364(2003)129:4(405)","title":"Predicting Cost Deviation in Reconstruction Projects: Artificial Neural Networks versus Regression","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":140,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; University of Toronto","funders":"","keywords":"Rework; Artificial neural network; Absolute deviation; Computer science; Standard deviation; Regression analysis; Reliability engineering; Engineering; Data mining; Statistics; Artificial intelligence; Machine learning; Mathematics","score_opus":0.05207126550196439,"score_gpt":0.3023404797402309,"score_spread":0.25026921423826654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2053272969","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8396911,0.00069187686,0.15702412,0.00058657874,0.000041491832,0.0000721777,0.0002614274,0.00025872837,0.0013724852],"genre_scores_gemma":[0.9814953,0.00032220554,0.017407218,0.000028848968,0.000020294263,0.000042568445,0.00021940997,0.0000119320985,0.00045224704],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991147,0.00042068944,0.0000727116,0.000115556286,0.00019304774,0.00008328654],"domain_scores_gemma":[0.9943598,0.0045415587,0.00044723335,0.00011232873,0.00046452164,0.00007458405],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025337082,0.00075924245,0.0006496357,0.0013662265,0.00022052813,0.00089350477,0.000607774,0.0009900909,0.0005056315],"category_scores_gemma":[0.011442731,0.00036458066,0.0004173474,0.0015262383,0.00030024085,0.001128987,0.00041622022,0.00091047544,0.00015245388],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011242889,0.00010681365,0.025340067,0.00003556598,0.0000559222,0.000042726904,0.00003309406,0.9430005,0.00029379848,0.000462457,0.00024763966,0.03026902],"study_design_scores_gemma":[0.0000028926734,0.000014858538,0.0016232069,0.000005014462,0.0000038012267,0.000004984938,0.000015189327,0.99789447,0.00012257663,0.00027273849,0.000036473983,0.0000038279873],"about_ca_topic_score_codex":0.013881333,"about_ca_topic_score_gemma":0.008063902,"teacher_disagreement_score":0.013881333,"about_ca_system_score_codex":0.00075395394,"about_ca_system_score_gemma":0.00058547215,"threshold_uncertainty_score":0.027601063},"labels":[],"label_agreement":null},{"id":"W2053843376","doi":"10.1108/ijmpb-04-2012-0012","title":"Bridging situated learning theory to the resource‐based view of project management","year":2013,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"","keywords":"Situated; Knowledge management; Situated learning; Project management; Project management 2.0; Originality; Project management triangle; Computer science; Management science; Project charter; Sociology; Engineering; Systems engineering; Pedagogy; Artificial intelligence; Qualitative research","score_opus":0.05879238159437041,"score_gpt":0.3529738799410347,"score_spread":0.2941814983466643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2053843376","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037166726,0.0038486882,0.7503262,0.024780259,0.00034147972,0.0004058159,0.000043035816,0.00012686466,0.18296097],"genre_scores_gemma":[0.8962737,0.002084573,0.0943665,0.0011387626,0.00015070285,0.00054717064,0.000036464597,0.00004235998,0.005359805],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9834863,0.012707954,0.00047292386,0.00081428763,0.001803481,0.0007149636],"domain_scores_gemma":[0.9831777,0.01229886,0.0010479628,0.0014097054,0.0009126379,0.0011531451],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012131994,0.0006274894,0.00070408545,0.0035704125,0.0033149912,0.009512255,0.0026303988,0.0025218872,0.0043033822],"category_scores_gemma":[0.011630061,0.00043681634,0.0008102487,0.0020128312,0.02825014,0.009302016,0.008287831,0.0040096687,0.00048299934],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000713363,0.00005937058,0.00047940845,0.0002379493,0.000013506328,0.00013970588,0.009031585,0.001982927,0.00012904646,0.96957034,0.00048373023,0.017865282],"study_design_scores_gemma":[0.000021689382,0.000065236185,0.0005514604,0.00047300043,0.000010777812,0.0001830795,0.008690679,0.0048369346,0.00027389033,0.951907,0.032965176,0.00002112138],"about_ca_topic_score_codex":0.0019535618,"about_ca_topic_score_gemma":0.0017087018,"teacher_disagreement_score":0.012131994,"about_ca_system_score_codex":0.0070446804,"about_ca_system_score_gemma":0.008237972,"threshold_uncertainty_score":0.06416088},"labels":[],"label_agreement":null},{"id":"W2053885828","doi":"10.1108/17538370910971072","title":"New approaches in project performance evaluation techniques","year":2009,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Government of Ontario","funders":"","keywords":"Procurement; Process management; Project management; Computer science; Originality; Earned value management; Engineering management; Management science; Competence (human resources); Project planning; Systems engineering; Project charter; Engineering; Business; Qualitative research; Management","score_opus":0.2062841970922184,"score_gpt":0.40939620200804977,"score_spread":0.20311200491583137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2053885828","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035792787,0.0033347863,0.96551,0.0023574529,0.00023148899,0.0006074215,0.00008867657,0.00048015662,0.023810696],"genre_scores_gemma":[0.06991444,0.0019475941,0.92307335,0.00034437684,0.00020339854,0.0014298208,0.00012112204,0.00017566067,0.0027902524],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.84418863,0.10598132,0.009404145,0.008337847,0.030651249,0.0014368213],"domain_scores_gemma":[0.8082604,0.13898306,0.008762478,0.021338386,0.021324096,0.001331699],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.087175265,0.0026319982,0.0018232726,0.015826946,0.0019957323,0.014752367,0.0047409683,0.002592742,0.00712361],"category_scores_gemma":[0.1573946,0.0016251868,0.0024118493,0.013260305,0.011785576,0.02082802,0.009839277,0.005793895,0.0022901644],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006808821,0.0002198499,0.002321656,0.0021013175,0.00013626962,0.00010914073,0.006050346,0.0063527436,0.0007065932,0.5279444,0.002979671,0.45100996],"study_design_scores_gemma":[0.000092591305,0.0004652998,0.0028533393,0.0039859503,0.0001540795,0.0007304673,0.0061917854,0.07106801,0.0017850992,0.78662664,0.12585315,0.00019354324],"about_ca_topic_score_codex":0.002018009,"about_ca_topic_score_gemma":0.0017327606,"teacher_disagreement_score":0.087175265,"about_ca_system_score_codex":0.007033309,"about_ca_system_score_gemma":0.0054063695,"threshold_uncertainty_score":0.4610324},"labels":[],"label_agreement":null},{"id":"W2054050123","doi":"10.1139/l06-119","title":"Building a relational contracting culture and integrated teams","year":2007,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Incentive; Teamwork; Business; Knowledge management; Marketing; Perception; Construction industry; Team building; Process management; Engineering; Psychology; Engineering management; Computer science; Management; Economics","score_opus":0.02341561447340262,"score_gpt":0.27588963203806427,"score_spread":0.25247401756466165,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2054050123","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9848104,0.00018354022,0.003923058,0.00031274292,0.000010671856,0.000053740565,0.0000067838523,0.000007988006,0.010691191],"genre_scores_gemma":[0.9980565,0.00012861835,0.001340034,0.000028091315,0.0000030910956,0.000016806996,0.0000073746296,0.0000029008593,0.000416527],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.98862004,0.006911124,0.0006274202,0.00045549282,0.0024917445,0.00089414034],"domain_scores_gemma":[0.9876847,0.0036687185,0.0044698855,0.0008647275,0.0015566662,0.001755198],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0113832345,0.00023502397,0.00021784581,0.001052384,0.0022908845,0.0036337087,0.0006155355,0.00033144417,0.0026672562],"category_scores_gemma":[0.016022388,0.00020812386,0.00023054695,0.0011700991,0.002746799,0.0021477002,0.0051062726,0.0006795235,0.00025700327],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014913027,0.0007166504,0.5831879,0.0005245072,0.000129086,0.0008778374,0.15811867,0.0021516632,0.004684305,0.030791612,0.00078176544,0.21788687],"study_design_scores_gemma":[0.00004629494,0.001966024,0.60554725,0.0007495744,0.00010330246,0.0017277392,0.343347,0.0067331675,0.0031979124,0.007397558,0.029066186,0.00011797129],"about_ca_topic_score_codex":0.0049196524,"about_ca_topic_score_gemma":0.0072143762,"teacher_disagreement_score":0.0113832345,"about_ca_system_score_codex":0.0023324292,"about_ca_system_score_gemma":0.005396266,"threshold_uncertainty_score":0.06020105},"labels":[],"label_agreement":null},{"id":"W2055272691","doi":"10.1016/j.ijproman.2014.01.010","title":"A conceptualization of knowledge governance in project-based organizations","year":2014,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":89,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Conceptualization; Relation (database); Corporate governance; Knowledge management; Context (archaeology); Process management; Macro; Engineering; Business; Computer science; Artificial intelligence","score_opus":0.04985275369409702,"score_gpt":0.3888321521506335,"score_spread":0.33897939845653646,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2055272691","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17657138,0.0014210002,0.52348524,0.030348899,0.00020080617,0.00062612264,0.00022311596,0.00016025336,0.26696318],"genre_scores_gemma":[0.96397334,0.00027504205,0.032442752,0.00030071707,0.000053987376,0.0003068383,0.00007327998,0.000020948186,0.0025530374],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9906221,0.005786096,0.0006115072,0.0009140897,0.0011266546,0.00093947083],"domain_scores_gemma":[0.9843588,0.008446221,0.002080044,0.0016387791,0.0018063397,0.0016699126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012221842,0.00054673274,0.00055196363,0.004327085,0.004382888,0.015267121,0.0027811208,0.0038330024,0.0043118927],"category_scores_gemma":[0.014592099,0.0005633031,0.00092532,0.004941707,0.02742686,0.01603172,0.0047357483,0.0029683078,0.00039068543],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004383686,0.000023381901,0.0006382632,0.000014688964,0.0000045647507,0.000053148917,0.0037740292,0.0008059916,0.00006874059,0.9925371,0.00022345119,0.0018522766],"study_design_scores_gemma":[0.000025593567,0.000045058237,0.0014882355,0.00013894752,0.000019653515,0.00013475916,0.012043551,0.008131794,0.00019465835,0.96310985,0.014647638,0.000020252588],"about_ca_topic_score_codex":0.007525453,"about_ca_topic_score_gemma":0.004288943,"teacher_disagreement_score":0.015267121,"about_ca_system_score_codex":0.0059763715,"about_ca_system_score_gemma":0.010205109,"threshold_uncertainty_score":0.06463605},"labels":[],"label_agreement":null},{"id":"W2056074104","doi":"10.1139/l09-070","title":"Correlation between innovation and performance of construction firms","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Industrial organization; Product (mathematics); Business; Process (computing); Product innovation; Marketing; Computer science; Mathematics","score_opus":0.02860732715327274,"score_gpt":0.2558312695025065,"score_spread":0.22722394234923377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2056074104","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99893063,0.000069502676,0.00007099898,0.00004144084,0.000002813138,0.000004380551,0.00013711592,0.000003231843,0.000739735],"genre_scores_gemma":[0.99951875,0.000027261129,0.000031198484,0.000004403001,0.000003868645,0.0000029952614,0.00021778153,8.9012093e-7,0.0001929478],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99829525,0.00031008088,0.00021111224,0.00022734473,0.00052845327,0.00042769866],"domain_scores_gemma":[0.9789854,0.0057812207,0.00910214,0.000789972,0.003422873,0.0019184636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017117123,0.0001943217,0.00026180813,0.0023290862,0.00034167318,0.0012353702,0.00034216492,0.00057700154,0.0012799479],"category_scores_gemma":[0.011020106,0.000113312366,0.00030445014,0.0023830987,0.0005452301,0.00064648327,0.001044663,0.0008048812,0.00033142522],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002279041,0.000040373143,0.9969863,0.000005579903,0.000026534306,0.00003799284,0.00014948874,0.00032153868,0.00009968084,0.000066142115,0.000069317466,0.0021742396],"study_design_scores_gemma":[0.0000011582262,0.000044803062,0.9990841,0.0000031139018,0.0000055065707,0.000030271704,0.00021657588,0.00031765268,0.0000682091,0.000026800986,0.00019724706,0.000004511612],"about_ca_topic_score_codex":0.0062132636,"about_ca_topic_score_gemma":0.007644072,"teacher_disagreement_score":0.0062132636,"about_ca_system_score_codex":0.0009967454,"about_ca_system_score_gemma":0.0006741934,"threshold_uncertainty_score":0.012354195},"labels":[],"label_agreement":null},{"id":"W2056317193","doi":"10.1108/jocm-09-2013-0173","title":"When infrastructure transition and work practice redesign collide","year":2014,"lang":"en","type":"article","venue":"Journal of Organizational Change Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Engineering and Physical Sciences Research Council","keywords":"Originality; Work (physics); Change management (ITSM); Value (mathematics); Knowledge management; Dual (grammatical number); Process management; Sociology; Public relations; Computer science; Business; Political science; Qualitative research; Engineering; Marketing","score_opus":0.0515472848466657,"score_gpt":0.307957990739925,"score_spread":0.2564107058932593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2056317193","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82276076,0.004703275,0.022574916,0.07782914,0.0011688396,0.0004895457,0.0002671073,0.0003330916,0.06987329],"genre_scores_gemma":[0.9935561,0.00044072737,0.0023646296,0.0014576782,0.00009390727,0.00014872456,0.000106897576,0.00004943466,0.0017819558],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9565451,0.02211514,0.002288898,0.004185504,0.008140901,0.006724412],"domain_scores_gemma":[0.89557403,0.061898757,0.016750546,0.008327804,0.00929819,0.008150624],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.026515972,0.00044062914,0.00066887256,0.0037493317,0.006929642,0.02081841,0.0024512887,0.004706071,0.007315704],"category_scores_gemma":[0.109307066,0.0009211729,0.00076189265,0.0043190885,0.014228966,0.023173243,0.020878552,0.0057376786,0.001223193],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005225961,0.00043995702,0.16318981,0.0007790771,0.000104228726,0.004746805,0.5290223,0.00082349003,0.0010694907,0.08406292,0.012226266,0.20301306],"study_design_scores_gemma":[0.000029185047,0.00015988419,0.07253788,0.0008257268,0.00002907947,0.0014136763,0.8470964,0.0013789354,0.00040184185,0.040435873,0.03560223,0.00008928392],"about_ca_topic_score_codex":0.008525607,"about_ca_topic_score_gemma":0.009561873,"teacher_disagreement_score":0.026515972,"about_ca_system_score_codex":0.010761157,"about_ca_system_score_gemma":0.012905497,"threshold_uncertainty_score":0.14023155},"labels":[],"label_agreement":null},{"id":"W2056931715","doi":"10.12735/jbm.v2i1p34","title":"Assessment of Business Development Strategies in the Nigerian Construction Industry","year":2013,"lang":"en","type":"article","venue":"Journal of Business & Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Business development; Process management; Industrial organization; Marketing","score_opus":0.057755884809735245,"score_gpt":0.34435091849493066,"score_spread":0.2865950336851954,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2056931715","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99233997,0.0003809293,0.00029737377,0.00015229311,0.0000024986775,0.0000411816,0.000014525018,0.0000013895091,0.0067699],"genre_scores_gemma":[0.99738985,0.0006245128,0.0008277862,0.000020180121,0.0000010305654,0.000021080603,0.000024581639,8.042265e-7,0.0010901709],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99903536,0.00034601724,0.000074170224,0.000052544834,0.00029640063,0.00019542931],"domain_scores_gemma":[0.9980939,0.0005881244,0.00047305436,0.000027703694,0.00047033463,0.00034688006],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010848148,0.00026083496,0.00012387263,0.0021930712,0.0007363587,0.0017947262,0.0001522489,0.0003452139,0.0007837812],"category_scores_gemma":[0.0024576283,0.00014909758,0.00010554223,0.0012699111,0.000482841,0.00082892744,0.0006929111,0.00022648791,0.00012759786],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011194447,0.0006153315,0.7600752,0.00033290245,0.000024998157,0.0012632473,0.0373242,0.00089796056,0.003451098,0.0038700055,0.0007516911,0.19128138],"study_design_scores_gemma":[0.000008110998,0.0005440572,0.79424655,0.00040983944,0.000020074456,0.0009891124,0.18245678,0.002218215,0.0022446997,0.0011892543,0.015637968,0.000035287183],"about_ca_topic_score_codex":0.0025341567,"about_ca_topic_score_gemma":0.007181898,"teacher_disagreement_score":0.0025341567,"about_ca_system_score_codex":0.0012959538,"about_ca_system_score_gemma":0.0023157222,"threshold_uncertainty_score":0.009402871},"labels":[],"label_agreement":null},{"id":"W2057142815","doi":"10.1002/pmj.20072","title":"A Project Portfolio Risk-Opportunity Identification Framework","year":2008,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":85,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Portfolio; Identification (biology); Risk analysis (engineering); Project portfolio management; Application portfolio management; Risk management; Project risk management; Risk management framework; Domain (mathematical analysis); Business; Process management; Modern portfolio theory; Risk management plan; Management science; Computer science; Project management; IT risk management; Engineering; Finance; Systems engineering","score_opus":0.15581800649170074,"score_gpt":0.39586012921477315,"score_spread":0.2400421227230724,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2057142815","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0052730036,0.0005430142,0.9715611,0.0010550364,0.000041837073,0.00016611915,0.000191017,0.00011053158,0.021058472],"genre_scores_gemma":[0.43289775,0.0015666216,0.554227,0.0002172325,0.00016044368,0.0007716169,0.00039081046,0.00005744725,0.009711107],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9963471,0.0015546809,0.00019771536,0.00038678796,0.0011851896,0.00032836787],"domain_scores_gemma":[0.9976071,0.0012350698,0.00037534494,0.00015522944,0.0004214261,0.00020580707],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0049106153,0.001628435,0.000926783,0.0039496026,0.0011815588,0.0043184077,0.0022021835,0.001982447,0.006350893],"category_scores_gemma":[0.0071784183,0.00058516,0.0011066524,0.0030498726,0.0020199374,0.004509506,0.0037143042,0.001965258,0.0007961778],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018329283,0.00005355148,0.0009811408,0.000102613274,0.000035475157,0.00027717714,0.00029849142,0.09612105,0.00021967645,0.873029,0.0017503957,0.027113093],"study_design_scores_gemma":[0.000019604237,0.00007026904,0.0005662542,0.00014534542,0.000037102072,0.00035749568,0.00036181838,0.23158771,0.0003257125,0.7520257,0.014445145,0.000057752037],"about_ca_topic_score_codex":0.0035132125,"about_ca_topic_score_gemma":0.0026167363,"teacher_disagreement_score":0.006350893,"about_ca_system_score_codex":0.0022541175,"about_ca_system_score_gemma":0.0034568468,"threshold_uncertainty_score":0.025970161},"labels":[],"label_agreement":null},{"id":"W2057214931","doi":"10.1108/ecam-08-2012-0080","title":"Framework for enhanced progress tracking and control of linear projects","year":2014,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Documentation; Schedule; Computer science; Scheduling (production processes); Project management; Control (management); Operations research; Systems engineering; Industrial engineering; Engineering; Operations management","score_opus":0.030307440907443615,"score_gpt":0.31211288880083515,"score_spread":0.2818054478933915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2057214931","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012092871,0.000054858945,0.99701095,0.000048123817,0.00001982111,0.000060840524,0.000040689672,0.00034579923,0.0012095962],"genre_scores_gemma":[0.23711601,0.00035964724,0.7569516,0.00008021792,0.00010301629,0.0006540001,0.00032902035,0.00017163611,0.004234931],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.997666,0.00056042144,0.00016500954,0.0006511277,0.0007367072,0.00022086233],"domain_scores_gemma":[0.99786454,0.00083401566,0.00043157244,0.00024637603,0.0004926931,0.00013084496],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002876311,0.0012359687,0.0007817381,0.0013036131,0.0006436381,0.0019448865,0.0021980049,0.0009251706,0.005285426],"category_scores_gemma":[0.0049522817,0.00058821036,0.0012641227,0.0009186246,0.0009686942,0.0016841023,0.0020210326,0.0014590445,0.00096482463],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010824776,0.00012720557,0.0011486145,0.00029501278,0.000049559767,0.00021084255,0.00034289362,0.74984556,0.0045741717,0.10904734,0.0025832206,0.13166729],"study_design_scores_gemma":[0.000021118154,0.00006371915,0.00017113188,0.000031194064,0.000016975971,0.000048450383,0.000038806982,0.9770583,0.0011881551,0.015260791,0.00608289,0.000018482047],"about_ca_topic_score_codex":0.0090201385,"about_ca_topic_score_gemma":0.006875336,"teacher_disagreement_score":0.0090201385,"about_ca_system_score_codex":0.001454959,"about_ca_system_score_gemma":0.003399293,"threshold_uncertainty_score":0.017935276},"labels":[],"label_agreement":null},{"id":"W2057311050","doi":"10.1007/s11518-011-5157-y","title":"Managing construction risks of AP1000 nuclear power plants in China","year":2011,"lang":"en","type":"article","venue":"Journal of Systems Science and Systems Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"China; Nuclear power; Risk management; Risk analysis (engineering); Business; Nuclear power plant; Face (sociological concept); Risk assessment; Engineering; Operations management; Finance; Political science; Computer science; Computer security","score_opus":0.09025276319290448,"score_gpt":0.3079713934908201,"score_spread":0.2177186302979156,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2057311050","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9969572,0.00007190796,0.0013534391,0.00020065621,0.0000030093493,0.000029802139,0.00003980534,0.000013165436,0.0013310505],"genre_scores_gemma":[0.9990902,0.000041744977,0.0003100864,0.000007088363,0.0000025611557,0.0000105861545,0.00003803226,0.0000020798052,0.00049763446],"study_design_codex":"simulation_or_modeling","study_design_gemma":"qualitative","domain_scores_codex":[0.99824995,0.0004777103,0.00009722374,0.00015108827,0.0005583394,0.00046562726],"domain_scores_gemma":[0.99711007,0.0010125436,0.0006902554,0.00010527612,0.0006115359,0.00047032782],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002079756,0.00074065593,0.0006005489,0.002197805,0.0022771053,0.002422242,0.0013929603,0.0017178229,0.001112147],"category_scores_gemma":[0.0036660314,0.00046836826,0.0006514414,0.0015019107,0.0007995242,0.0013827316,0.0018076778,0.0007273424,0.00007555992],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007230401,0.0007735723,0.38725778,0.00019269256,0.00028641618,0.0050202236,0.0051908176,0.51404667,0.0075036786,0.010371247,0.0017400497,0.06689381],"study_design_scores_gemma":[0.00009850946,0.0006221084,0.28016266,0.00005800928,0.00023146755,0.0005510566,0.010382158,0.6933824,0.0024851905,0.008880465,0.0029995404,0.00014637886],"about_ca_topic_score_codex":0.0743183,"about_ca_topic_score_gemma":0.06779312,"teacher_disagreement_score":0.0743183,"about_ca_system_score_codex":0.008070194,"about_ca_system_score_gemma":0.010617991,"threshold_uncertainty_score":0.14777142},"labels":[],"label_agreement":null},{"id":"W2057968690","doi":"10.3992/jgb.1.4.48","title":"Hunzinger Construction Company LEED CI Remodel: Green Through the Eyes of the General Contractor","year":2006,"lang":"en","type":"article","venue":"Journal of Green Building","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Eston College","funders":"","keywords":"Status quo; Quality (philosophy); Process (computing); Marketing; Business; Public relations; Economics; Market economy; Political science","score_opus":0.05982519326508883,"score_gpt":0.34470750477787765,"score_spread":0.2848823115127888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2057968690","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017908081,0.004922837,0.008263746,0.19231544,0.0070630126,0.0002162228,0.00039863327,0.0031620977,0.7657498],"genre_scores_gemma":[0.036413684,0.0013030921,0.0030559434,0.012675233,0.00036890074,0.000043826203,0.00014561691,0.000809937,0.9451839],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9972253,0.0003335783,0.000049495105,0.00028644054,0.0017608482,0.00034449177],"domain_scores_gemma":[0.9968664,0.00044675378,0.000117549185,0.00026596617,0.0010385311,0.0012647869],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025153211,0.000570379,0.00024006629,0.0008452063,0.0069413595,0.006425326,0.000846052,0.0033415328,0.1785235],"category_scores_gemma":[0.005398949,0.00043626368,0.00020053325,0.0008362234,0.0024913824,0.0030343134,0.0031682914,0.0045290357,0.036445692],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018103712,0.00004005292,0.000763694,0.000030586212,0.0000013402433,0.00024737115,0.0009010004,0.0000859973,0.0005662879,0.005810529,0.9436531,0.04788199],"study_design_scores_gemma":[0.000003528017,0.000017733633,0.0006929243,0.000046886158,6.948085e-7,0.00018044749,0.0019188296,0.00011539082,0.00016885482,0.0009003722,0.99594444,0.000009945579],"about_ca_topic_score_codex":0.024377346,"about_ca_topic_score_gemma":0.07784425,"teacher_disagreement_score":0.1785235,"about_ca_system_score_codex":0.0038772358,"about_ca_system_score_gemma":0.008048668,"threshold_uncertainty_score":0.5972206},"labels":[],"label_agreement":null},{"id":"W2058203450","doi":"10.1139/l07-089","title":"Minimisation des surcoûts dans un contexte hors délai : cas des projets de construction dans les pays en développement","year":2007,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cost overrun; Total cost; Context (archaeology); Duration (music); Computer science; Cost analysis; Operations management; Operations research; Construction industry; Mathematics; Engineering; Economics; Construction engineering; Geography; Accounting","score_opus":0.04801878635622374,"score_gpt":0.29329113309375265,"score_spread":0.2452723467375289,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2058203450","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48221645,0.0008292107,0.5091385,0.0009575254,0.00005453102,0.00015835107,0.00015625732,0.000095246294,0.0063937847],"genre_scores_gemma":[0.9563534,0.00034853112,0.04022694,0.000024697343,0.000023989798,0.00009079283,0.000058865295,0.00003141369,0.0028413676],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99855214,0.00063677813,0.000047452046,0.0002159999,0.00027525978,0.0002723353],"domain_scores_gemma":[0.99674207,0.0023503902,0.00036433825,0.0000657532,0.0002671707,0.00021024575],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026389093,0.0009985109,0.001054363,0.0009476257,0.0008753881,0.0022172292,0.0011075204,0.001565481,0.0014452457],"category_scores_gemma":[0.0070520258,0.0005465713,0.0006773146,0.00092434726,0.0013151047,0.00201039,0.0011782921,0.0014380737,0.000081263046],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009098997,0.000046691075,0.0013867588,0.00007458374,0.000024652332,0.0002535686,0.00009651264,0.975577,0.0012703607,0.013884878,0.00021751657,0.007076514],"study_design_scores_gemma":[0.000011293188,0.00009113597,0.0008926677,0.000011939023,0.000017046335,0.0000668727,0.00014830584,0.9895068,0.0013365125,0.007418883,0.00048413838,0.000014382983],"about_ca_topic_score_codex":0.021930497,"about_ca_topic_score_gemma":0.013472845,"teacher_disagreement_score":0.021930497,"about_ca_system_score_codex":0.002891795,"about_ca_system_score_gemma":0.0026406355,"threshold_uncertainty_score":0.043605685},"labels":[],"label_agreement":null},{"id":"W2058443332","doi":"10.1139/l08-018","title":"Initial metrics and pilot program results for measuring the performance of the Canadian construction industry","year":2008,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":88,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Université du Québec en Outaouais; Council of Canadians with Disabilities; University of Alberta; Canadian Natural Resources; University of Waterloo; International Council for Canadian Studies; University of New Brunswick","funders":"Ministero dello Sviluppo Economico","keywords":"Benchmarking; Scope (computer science); Quality (philosophy); Sustainability; Presentation (obstetrics); Data collection; Engineering; Engineering management; Performance measurement; Construction management; Performance indicator; Process management; Transport engineering; Computer science; Business; Civil engineering; Marketing","score_opus":0.09878034365672206,"score_gpt":0.2868139684796416,"score_spread":0.18803362482291952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2058443332","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7532622,0.0015629722,0.058239017,0.004026978,0.00033853744,0.02731618,0.016630152,0.0023471385,0.13627687],"genre_scores_gemma":[0.8379613,0.0013318509,0.12565309,0.00026755722,0.000055407614,0.010583541,0.009755643,0.00037373562,0.014017712],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9549207,0.009006948,0.00205307,0.0012099743,0.029924884,0.0028845274],"domain_scores_gemma":[0.9117609,0.008881097,0.00234697,0.003537535,0.06995818,0.0035153823],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.041080706,0.0011258192,0.00063894043,0.006882829,0.0033256097,0.0022481498,0.0017540766,0.0006590412,0.002638529],"category_scores_gemma":[0.059910472,0.00034387963,0.0005796225,0.009361508,0.0013106694,0.0019659915,0.0020640288,0.0012017962,0.00046836716],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014763663,0.004345446,0.18177758,0.0022909103,0.00013247479,0.0006793101,0.020960188,0.0100672385,0.023948206,0.018550703,0.05928357,0.67648804],"study_design_scores_gemma":[0.00020583821,0.011344383,0.8096058,0.0007554725,0.00016507151,0.00028120156,0.023828039,0.010375011,0.027963713,0.0031234873,0.11201925,0.00033273885],"about_ca_topic_score_codex":0.5667325,"about_ca_topic_score_gemma":0.6546777,"teacher_disagreement_score":0.97113144,"about_ca_system_score_codex":0.02886858,"about_ca_system_score_gemma":0.05148435,"threshold_uncertainty_score":0.8716382},"labels":[],"label_agreement":null},{"id":"W2059692706","doi":"10.2495/risk140211","title":"Estimating post- and pre-mitigation contingency in construction","year":2014,"lang":"en","type":"article","venue":"WIT transactions on information and communication technologies","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Contingency; Contingency plan; Risk analysis (engineering); Risk management; Computer science; Cost contingency; Cost estimate; Schedule; Estimation; Control (management); Business; Engineering; Cost engineering; Systems engineering; Computer security","score_opus":0.01843034806305818,"score_gpt":0.2900816312226168,"score_spread":0.27165128315955867,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2059692706","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33601788,0.0006606222,0.6582931,0.0001281553,0.000027852831,0.00013863842,0.00018865276,0.00034141418,0.004203668],"genre_scores_gemma":[0.95540076,0.0001966834,0.043832827,0.000005913303,0.0000044644853,0.0000333058,0.000097270306,0.000013839903,0.000414869],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920374,0.00021800939,0.000046782265,0.000112216694,0.00034247717,0.00007681893],"domain_scores_gemma":[0.99890244,0.0005651338,0.00025471402,0.000057557096,0.00018408401,0.000036041198],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008638313,0.0007579507,0.00038950454,0.0016305821,0.00041323356,0.00080613396,0.00041507967,0.00056578155,0.0007530801],"category_scores_gemma":[0.0021081525,0.00040954578,0.0004254569,0.0009576757,0.000282051,0.0009888771,0.00049484894,0.00040972192,0.000103155915],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006412598,0.000029107101,0.020364024,0.00009748585,0.00003600773,0.0001748466,0.00008596346,0.92521787,0.0038271607,0.0018000681,0.00024215323,0.048061214],"study_design_scores_gemma":[0.0000040719447,0.00007542505,0.011304074,0.00001594667,0.000026344602,0.00008422205,0.00012295536,0.9829631,0.0028147,0.0020737718,0.0004887471,0.000026762582],"about_ca_topic_score_codex":0.009242212,"about_ca_topic_score_gemma":0.010374892,"teacher_disagreement_score":0.009242212,"about_ca_system_score_codex":0.0006576207,"about_ca_system_score_gemma":0.0009031606,"threshold_uncertainty_score":0.018376827},"labels":[],"label_agreement":null},{"id":"W2060112169","doi":"10.1061/(asce)0733-9364(2008)134:8(575)","title":"Delay Analysis under Multiple Baseline Updates","year":2008,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Baseline (sea); Critical path method; Computer science; Schedule; Static timing analysis; Representation (politics); Resource (disambiguation); Operations research; Industrial engineering; Real-time computing; Systems engineering; Engineering; Computer network; Embedded system; Operating system","score_opus":0.03354328673415646,"score_gpt":0.2782210340739991,"score_spread":0.24467774733984266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2060112169","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25031656,0.00034808813,0.7428392,0.00019306348,0.00004879851,0.00009851018,0.0003429148,0.00047988087,0.0053330013],"genre_scores_gemma":[0.9790288,0.00020003255,0.018245872,0.000012937402,0.000018753139,0.000049236867,0.00012534262,0.000054677505,0.0022642221],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989157,0.00015352218,0.00004548163,0.00024299367,0.0004283834,0.00021398132],"domain_scores_gemma":[0.9958877,0.0022918107,0.0006843408,0.00024728882,0.0007413979,0.00014753564],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016079067,0.0005994415,0.00055488304,0.0011253441,0.0003214491,0.00095724507,0.00094515516,0.00049668056,0.002447579],"category_scores_gemma":[0.008267347,0.00031308585,0.00043797752,0.0009091326,0.00048442936,0.002070331,0.00056628516,0.0007398454,0.00023050584],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021233996,0.000039957275,0.0048187035,0.000064031075,0.00002519848,0.00021312002,0.00015662104,0.9359909,0.007408902,0.0217775,0.0004872175,0.028805565],"study_design_scores_gemma":[0.0000074567392,0.00006827902,0.001533523,0.000004728947,0.000014036429,0.000054431322,0.000058509173,0.99049485,0.00204864,0.0049471487,0.0007556948,0.000012747145],"about_ca_topic_score_codex":0.011700671,"about_ca_topic_score_gemma":0.0043882616,"teacher_disagreement_score":0.011700671,"about_ca_system_score_codex":0.00171463,"about_ca_system_score_gemma":0.0016330571,"threshold_uncertainty_score":0.023265123},"labels":[],"label_agreement":null},{"id":"W2063243514","doi":"10.1680/cien.2012.165.3.102","title":"Work harder on yourself than you do on your job: a new challenge for civil engineers","year":2012,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Work (physics); Prestige; Engineering ethics; Public relations; Political science; Engineering; Sociology; Management; Economics; Mechanical engineering","score_opus":0.054923304235137506,"score_gpt":0.28692308862084054,"score_spread":0.23199978438570304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2063243514","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004897344,0.008623337,0.001254404,0.9521754,0.018941553,0.000020789237,0.000028789487,0.00010921678,0.013949264],"genre_scores_gemma":[0.104930505,0.03428018,0.009885572,0.66834295,0.022005333,0.00019635241,0.00014641408,0.00058653945,0.15962622],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9915187,0.002850231,0.00027635557,0.0005189919,0.003111688,0.0017240758],"domain_scores_gemma":[0.9693145,0.0071248654,0.0010030208,0.0007467467,0.005389537,0.016421294],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0088682575,0.00090976944,0.0008933967,0.0007700686,0.013585505,0.013383471,0.0014971358,0.010988938,0.016062874],"category_scores_gemma":[0.01713355,0.00075795496,0.0007452612,0.000962533,0.0071127587,0.012157674,0.0057208515,0.016836332,0.01064257],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000359719,0.0001563083,0.0013057889,0.00016010602,0.000012408043,0.00026927362,0.0054237787,0.00008392449,0.0005653987,0.0060240105,0.9221568,0.06380626],"study_design_scores_gemma":[0.00002317654,0.00018146019,0.0026431754,0.00049879216,0.000009552286,0.0009399153,0.05018794,0.00021677383,0.00022039971,0.017724494,0.92726433,0.00009002295],"about_ca_topic_score_codex":0.00251488,"about_ca_topic_score_gemma":0.012922346,"teacher_disagreement_score":0.016062874,"about_ca_system_score_codex":0.0026521184,"about_ca_system_score_gemma":0.009432466,"threshold_uncertainty_score":0.053735733},"labels":[],"label_agreement":null},{"id":"W2065319455","doi":"10.1108/14714170910931534","title":"The challenge of organizational design for manufactured construction","year":2009,"lang":"en","type":"article","venue":"Construction Innovation","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"","keywords":"Innovator; Originality; Context (archaeology); Process (computing); Knowledge management; Value (mathematics); Intervention (counseling); Organizational architecture; Organizational structure; Business; Process management; Engineering; Computer science; Management; Sociology; Intellectual property; Economics; Psychology; Qualitative research","score_opus":0.09389895330595867,"score_gpt":0.3468520792839316,"score_spread":0.2529531259779729,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2065319455","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09341135,0.010238391,0.44082126,0.14129761,0.0016937173,0.00047921998,0.00011412037,0.00019759587,0.31174675],"genre_scores_gemma":[0.909573,0.0019488389,0.07858086,0.0022691523,0.00034381764,0.00050414616,0.000056803627,0.00007165081,0.0066517503],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9772778,0.017596696,0.000575334,0.0011470399,0.0025118235,0.00089127285],"domain_scores_gemma":[0.97133124,0.01858991,0.0020591286,0.0044618803,0.0022005101,0.0013573503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02090513,0.0004371004,0.00061572355,0.001935788,0.0063452977,0.013905551,0.0020657876,0.0034983286,0.0062365583],"category_scores_gemma":[0.019903945,0.00043494406,0.00083360035,0.0016010832,0.043198448,0.006900609,0.005882081,0.003909305,0.00087084353],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007937827,0.000024589128,0.0005904307,0.00014691391,0.00000805539,0.00006670276,0.0036842984,0.0009421573,0.000088393266,0.9828499,0.0010537788,0.010536874],"study_design_scores_gemma":[0.000023334826,0.00008735338,0.00091954885,0.00033975954,0.000013407003,0.00023482779,0.012037432,0.002630703,0.00028570485,0.89763457,0.08577158,0.000021784119],"about_ca_topic_score_codex":0.0017732203,"about_ca_topic_score_gemma":0.0019355826,"teacher_disagreement_score":0.02090513,"about_ca_system_score_codex":0.007945876,"about_ca_system_score_gemma":0.011706391,"threshold_uncertainty_score":0.11055815},"labels":[],"label_agreement":null},{"id":"W2068269209","doi":"10.7202/050008ar","title":"A Real Estate Agency's Level Analysis of the Climate-Performance Relationship","year":2005,"lang":"en","type":"article","venue":"Relations industrielles","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Agency (philosophy); Variance (accounting); Work (physics); Econometrics; Real estate; Analysis of variance; Statistics; Psychology; Environmental science; Mathematics; Economics; Accounting; Engineering; Sociology; Finance","score_opus":0.17218339450227757,"score_gpt":0.3571674308836201,"score_spread":0.1849840363813425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2068269209","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9948973,0.000022702588,0.00060338585,0.00004670305,0.000004571113,0.000013003796,0.00061348546,0.000025088813,0.0037738075],"genre_scores_gemma":[0.99641645,0.000021680733,0.0006029931,0.000010960824,0.0000063071548,0.000014034706,0.0005022203,0.00000425696,0.0024209833],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99937135,0.0002792627,0.000032776978,0.000088152745,0.00013480727,0.00009362937],"domain_scores_gemma":[0.9969476,0.0014068715,0.0004114638,0.000307106,0.000666711,0.00026029223],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00074892276,0.00016136722,0.00023077785,0.0009060265,0.0003640486,0.0006464121,0.00012329649,0.00016087682,0.0069465674],"category_scores_gemma":[0.0031725138,0.00009707707,0.0003126662,0.0015153612,0.00019791549,0.000259853,0.00036464812,0.00036027635,0.00085258094],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023824093,0.00024453038,0.97733533,0.00003278934,0.00014977796,0.00010249459,0.0004735064,0.0016531908,0.0017417434,0.0007734913,0.0011137865,0.016141102],"study_design_scores_gemma":[0.0000034355235,0.00016591178,0.99665403,0.0000017414105,0.00001832343,0.00002630988,0.00032384877,0.0015603363,0.00033695824,0.000085762695,0.0008186454,0.000004756624],"about_ca_topic_score_codex":0.0129891895,"about_ca_topic_score_gemma":0.022784226,"teacher_disagreement_score":0.0129891895,"about_ca_system_score_codex":0.0004530013,"about_ca_system_score_gemma":0.00053316733,"threshold_uncertainty_score":0.02582717},"labels":[],"label_agreement":null},{"id":"W2068721803","doi":"10.1002/pmj.21288","title":"Foundations of Project Management Research: An Explicit and Six-Facet Ontological Framework","year":2012,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":77,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa; Université du Québec en Outaouais","funders":"","keywords":"Facet (psychology); Set (abstract data type); Epistemology; Knowledge management; Sociology; Order (exchange); Project management; Computer science; Process management; Psychology; Business; Engineering; Philosophy; Systems engineering; Social psychology","score_opus":0.47586271733623975,"score_gpt":0.5296971390520168,"score_spread":0.053834421715777014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2068721803","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016941907,0.0035981385,0.85024023,0.025088532,0.00030875625,0.00040880198,0.00017909278,0.00009923397,0.103135206],"genre_scores_gemma":[0.5137624,0.0040818215,0.47517383,0.0011661549,0.0002974971,0.00124686,0.00027621607,0.000058421123,0.003936798],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97171515,0.019172087,0.0020133434,0.0013208821,0.0048670126,0.00091143383],"domain_scores_gemma":[0.9745343,0.014860954,0.0019396279,0.0040831063,0.0030703074,0.0015116972],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.029959174,0.0005837632,0.000971118,0.0057589165,0.0054441295,0.015518021,0.0025171358,0.003326604,0.0018500139],"category_scores_gemma":[0.021967204,0.0007788118,0.0013257148,0.005901665,0.03662483,0.018430576,0.008505925,0.0048565185,0.000513516],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000037826228,0.000011784279,0.00016656586,0.00005454517,0.0000031781058,0.000022731567,0.00233034,0.0003946242,0.000065510794,0.99215865,0.00022550033,0.0045627733],"study_design_scores_gemma":[0.0000050219146,0.0000097450165,0.00022217642,0.00021097419,0.000003876145,0.000041686948,0.0018473016,0.0018095083,0.00007350248,0.98232347,0.013442501,0.000010302855],"about_ca_topic_score_codex":0.0034634992,"about_ca_topic_score_gemma":0.002264599,"teacher_disagreement_score":0.029959174,"about_ca_system_score_codex":0.006978462,"about_ca_system_score_gemma":0.011815398,"threshold_uncertainty_score":0.15844113},"labels":[],"label_agreement":null},{"id":"W2069890660","doi":"10.1680/mpal.13.00002","title":"Virtual collaborative learning for building design","year":2014,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Management Procurement and Law","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Teamwork; Ethos; Process (computing); Psychology; Team building; Knowledge management; Medical education; Engineering; Mathematics education; Computer science; Engineering management; Political science; Medicine","score_opus":0.0299618637691476,"score_gpt":0.277796356607131,"score_spread":0.24783449283798337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2069890660","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04422252,0.019288285,0.5037781,0.0049697026,0.0015995068,0.0008528515,0.00045145128,0.0037824127,0.42105517],"genre_scores_gemma":[0.4158855,0.008610277,0.47964752,0.0009285983,0.0006949934,0.0018513955,0.00085803046,0.00041120016,0.09111254],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.998343,0.0010042198,0.000052948115,0.00013331838,0.0003767663,0.00008968319],"domain_scores_gemma":[0.9969524,0.001907234,0.00008387241,0.00053800165,0.00020573243,0.00031267077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024277386,0.0006645806,0.0004223168,0.001191465,0.0012031822,0.004825969,0.0014983945,0.0013056458,0.024740512],"category_scores_gemma":[0.0060358336,0.00017134332,0.0005073657,0.0013942178,0.0011503006,0.0025538332,0.0035036735,0.0010840017,0.0033800818],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017941503,0.00042154716,0.00068397174,0.0007937193,0.00004355729,0.00019976654,0.0023183448,0.006234411,0.0025164734,0.11924301,0.043606725,0.823759],"study_design_scores_gemma":[0.00020017248,0.0005508033,0.0027660155,0.0009658269,0.000065573935,0.00089644705,0.001887295,0.029222371,0.0023918825,0.23785545,0.7230959,0.00010233661],"about_ca_topic_score_codex":0.0014118219,"about_ca_topic_score_gemma":0.0031411976,"teacher_disagreement_score":0.024740512,"about_ca_system_score_codex":0.0012168782,"about_ca_system_score_gemma":0.0013177628,"threshold_uncertainty_score":0.08276528},"labels":[],"label_agreement":null},{"id":"W2070034663","doi":"10.1139/l07-100","title":"New paradigms for public procurement of construction projects in the United Kingdom — potential applicability in Spain","year":2008,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministerio de Fomento; European Commission","keywords":"Procurement; Delphi method; Delphi; Business; Engineering; Computer science; Marketing","score_opus":0.10203131912524523,"score_gpt":0.28483017256797255,"score_spread":0.18279885344272734,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2070034663","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82826114,0.006815969,0.015882194,0.013944932,0.00020344724,0.0006378135,0.000083797306,0.00006595247,0.1341047],"genre_scores_gemma":[0.97879523,0.0015339883,0.011280596,0.00068349123,0.000022677712,0.0002671314,0.00004586269,0.000017119128,0.0073538492],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.97839797,0.01487981,0.0012468112,0.00072897965,0.0022558046,0.0024906446],"domain_scores_gemma":[0.98424536,0.007520587,0.0013822428,0.00092854234,0.004418261,0.0015049577],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019954776,0.00035191164,0.00046362376,0.002638598,0.0027987678,0.011564056,0.0016745365,0.002403507,0.0034588838],"category_scores_gemma":[0.012091912,0.0004484541,0.00066913426,0.00344971,0.0042521413,0.0035881223,0.005887392,0.0012771733,0.00041199848],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019574787,0.0016724204,0.05860823,0.0031397522,0.00019456196,0.0057750256,0.10083835,0.03120993,0.0077805268,0.4481928,0.012596826,0.32803416],"study_design_scores_gemma":[0.0008263363,0.0016665682,0.095272735,0.0034675254,0.00010992911,0.0022806088,0.45086482,0.0218059,0.0035553693,0.058654487,0.36097753,0.0005180741],"about_ca_topic_score_codex":0.05909279,"about_ca_topic_score_gemma":0.08189033,"teacher_disagreement_score":0.05909279,"about_ca_system_score_codex":0.03422404,"about_ca_system_score_gemma":0.013730816,"threshold_uncertainty_score":0.24831396},"labels":[],"label_agreement":null},{"id":"W2070117088","doi":"10.1108/sd.2012.05628iaa.004","title":"Advancing project and portfolio management research: applying strategic management theories","year":2012,"lang":"en","type":"article","venue":"Strategic Direction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Project portfolio management; Knowledge management; Strategic management; Variety (cybernetics); Project management; Management science; Portfolio; Process management; Business; Computer science; Management; Engineering; Economics; Marketing","score_opus":0.22387891945069668,"score_gpt":0.43718324611118387,"score_spread":0.21330432666048718,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2070117088","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09249791,0.0635424,0.43741074,0.059729178,0.0012588245,0.00056299806,0.00011509771,0.00013766486,0.34474522],"genre_scores_gemma":[0.7933761,0.069842726,0.12827556,0.002488764,0.0006257948,0.0005859538,0.00012394655,0.00004876068,0.0046324367],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98307204,0.012686826,0.00058968447,0.00050614896,0.0025412254,0.0006040509],"domain_scores_gemma":[0.97109115,0.023828438,0.0015830795,0.0011276229,0.0013376162,0.0010321178],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019401789,0.0012205115,0.0010621303,0.009047573,0.0028075408,0.015456709,0.0020048916,0.0033812756,0.0042702756],"category_scores_gemma":[0.023081576,0.0006563954,0.0007292103,0.010896159,0.017446399,0.020305637,0.007421731,0.0042038825,0.00075284473],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012680278,0.000091585694,0.0022291266,0.00049285154,0.00002304216,0.00013111578,0.0051774206,0.0026973065,0.00010340132,0.90153944,0.0011965326,0.08630555],"study_design_scores_gemma":[0.00001570352,0.00007765867,0.0013826514,0.0013236586,0.000014048463,0.0001766899,0.012062589,0.005568561,0.00027967695,0.9425386,0.036528196,0.00003196017],"about_ca_topic_score_codex":0.0022322184,"about_ca_topic_score_gemma":0.002426256,"teacher_disagreement_score":0.019401789,"about_ca_system_score_codex":0.0060108704,"about_ca_system_score_gemma":0.011160025,"threshold_uncertainty_score":0.10260767},"labels":[],"label_agreement":null},{"id":"W2070375064","doi":"10.5555/2431518.2431929","title":"Scheduling simulation-based techniques for earned value management on resource-constrained schedules under delayed scenarios","year":2011,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Schedule; Earned value management; Scheduling (production processes); Project management; Dynamic priority scheduling; Discrete event simulation; Operations research; Real-time computing; Distributed computing; Project planning; Systems engineering; Simulation; Operations management; Engineering","score_opus":0.17365491410078066,"score_gpt":0.38047929853972023,"score_spread":0.20682438443893958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2070375064","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009404503,0.000058214035,0.989033,0.000056434274,0.000012850127,0.00005957329,0.000023775798,0.000206596,0.0011449732],"genre_scores_gemma":[0.5578329,0.00025393858,0.4397718,0.00004516214,0.000032789856,0.00041635698,0.00014314472,0.000110535715,0.0013934406],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992213,0.00048073434,0.000035946516,0.00007289058,0.0001277665,0.0000612418],"domain_scores_gemma":[0.9965251,0.002638697,0.00028084684,0.00019965017,0.00026212903,0.000093545415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021453367,0.00071449025,0.0009479274,0.00072124135,0.0004476473,0.0008187442,0.0012333103,0.00067753636,0.0024841854],"category_scores_gemma":[0.00574863,0.0005941081,0.00082729483,0.000844366,0.00056771596,0.0008476934,0.0010998222,0.0012538526,0.00026730358],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013150564,0.000009992493,0.00012824713,0.000012867744,0.000009561137,0.000010461363,0.00002541693,0.98955053,0.00019719047,0.0044824225,0.00006396431,0.0054961205],"study_design_scores_gemma":[0.0000036469387,0.000005419298,0.000016536635,0.0000020590312,0.0000016988541,0.0000020697194,0.0000040091354,0.9981528,0.00008015021,0.0015731332,0.00015699834,0.0000014010261],"about_ca_topic_score_codex":0.008039129,"about_ca_topic_score_gemma":0.005539529,"teacher_disagreement_score":0.008039129,"about_ca_system_score_codex":0.001269437,"about_ca_system_score_gemma":0.0016585009,"threshold_uncertainty_score":0.015984654},"labels":[],"label_agreement":null},{"id":"W2070455376","doi":"10.1115/ipc2004-0089","title":"Managing Projects for Life Cycle Success: Perfecting the Process","year":2004,"lang":"en","type":"article","venue":"2004 International Pipeline Conference, Volumes 1, 2, and 3","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"TransCanada (Canada)","funders":"","keywords":"Process management; Excellence; Process (computing); Task (project management); Computer science; Key (lock); Focus (optics); Project management; Perspective (graphical); Phase (matter); Engineering management; Engineering; Systems engineering; Computer security; Political science","score_opus":0.056871199947613964,"score_gpt":0.35350658526688455,"score_spread":0.2966353853192706,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2070455376","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12365925,0.011290517,0.61890656,0.05808103,0.0008015017,0.0015732171,0.00014614985,0.002381062,0.1831607],"genre_scores_gemma":[0.55148125,0.0088369865,0.42580673,0.0014307519,0.00036557188,0.00051394553,0.00018717279,0.00024476554,0.01113277],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9875969,0.003904336,0.00093813677,0.0007028642,0.0058317604,0.0010259263],"domain_scores_gemma":[0.98285204,0.004303736,0.0036245724,0.002353622,0.0036328763,0.003233143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.023503773,0.001069809,0.0006279824,0.00258337,0.0029474753,0.011141082,0.0017669626,0.0025957748,0.0032493286],"category_scores_gemma":[0.03369902,0.00055795535,0.00043010197,0.0020425012,0.004871757,0.012278675,0.0055604777,0.0020787022,0.0020279614],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014083857,0.0004456044,0.012121481,0.0012347671,0.00006291,0.00049408706,0.0060434197,0.014376995,0.0067956415,0.1827165,0.022751937,0.75281584],"study_design_scores_gemma":[0.00012392669,0.0017453486,0.020198707,0.0026701924,0.00010071517,0.0014947719,0.009284664,0.013934628,0.0088580055,0.5860821,0.35523129,0.00027563827],"about_ca_topic_score_codex":0.0016088615,"about_ca_topic_score_gemma":0.0017084561,"teacher_disagreement_score":0.023503773,"about_ca_system_score_codex":0.0025582463,"about_ca_system_score_gemma":0.01791779,"threshold_uncertainty_score":0.124301255},"labels":[],"label_agreement":null},{"id":"W2070566903","doi":"10.5539/emr.v3n2p10","title":"The Relationship between Level of Architect’s Professional Competencies and Client Satisfaction Level","year":2014,"lang":"en","type":"article","venue":"Engineering Management Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scale (ratio); Psychology; Knowledge management; Engineering; Computer science","score_opus":0.49992524693868495,"score_gpt":0.45492350038546825,"score_spread":0.045001746553216704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2070566903","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9970757,0.000044512224,0.00027350566,0.00012977232,0.0000018761785,0.000007969147,0.000040798943,0.0000041648545,0.002421734],"genre_scores_gemma":[0.9993637,0.00002730623,0.00012794738,0.000010496362,0.0000014773437,0.000006198727,0.000031423468,0.0000011070335,0.00043034737],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9976736,0.0009241404,0.00018147241,0.00011723737,0.00076575106,0.00033775615],"domain_scores_gemma":[0.979541,0.011636718,0.003587872,0.000445138,0.0029735272,0.0018156546],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022126534,0.00011419553,0.00023273852,0.00079145684,0.0003544343,0.0009818728,0.00022331967,0.00030880523,0.0072908336],"category_scores_gemma":[0.013136914,0.00011713472,0.00021693876,0.00087323907,0.0005756159,0.00031646315,0.00052648684,0.00071736594,0.0006025884],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008047706,0.00009293645,0.9867237,0.000021573604,0.000022219738,0.00008223614,0.0013117363,0.0001800586,0.00047756557,0.00019587927,0.00021888327,0.010592725],"study_design_scores_gemma":[0.0000026651828,0.00011569284,0.9953708,0.000008351456,0.0000089351615,0.00020449462,0.0028063592,0.0006930709,0.00024879034,0.000095609255,0.00043988734,0.000005343189],"about_ca_topic_score_codex":0.0043041036,"about_ca_topic_score_gemma":0.0064294487,"teacher_disagreement_score":0.0072908336,"about_ca_system_score_codex":0.00093294174,"about_ca_system_score_gemma":0.0009887306,"threshold_uncertainty_score":0.02439028},"labels":[],"label_agreement":null},{"id":"W2071867745","doi":"10.1002/pmj.20097","title":"The Value of Project Management to Organizations in Canada and Germany, or Do Values Add Value? Five Case Studies","year":2009,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Value (mathematics); Context (archaeology); Meaning (existential); Project management; Work (physics); Management science; Sociology; Management; Engineering; Computer science; Epistemology; Economics; Geography","score_opus":0.04895179059577891,"score_gpt":0.3735209233646086,"score_spread":0.3245691327688297,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2071867745","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96693325,0.0020331994,0.0007931516,0.0030840808,0.000028969065,0.00013048288,0.00009502224,0.000009980298,0.026891984],"genre_scores_gemma":[0.9963813,0.0010181981,0.000670695,0.00013556133,0.000003018795,0.000038525515,0.000035607583,0.000003542257,0.0017136395],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.98499936,0.0062030707,0.00031199283,0.00043239974,0.0037254593,0.00432784],"domain_scores_gemma":[0.98644614,0.006313516,0.0012148626,0.0003971334,0.0033063977,0.002321988],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007981623,0.0004236161,0.0004349569,0.003315825,0.017341837,0.0075676306,0.001386293,0.0016139207,0.0012097729],"category_scores_gemma":[0.017294519,0.00035419737,0.00031143957,0.009033451,0.008639908,0.0022739365,0.0038137962,0.0017253254,0.00008279499],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00084947114,0.0011738329,0.19547887,0.0011101784,0.00017112982,0.009347267,0.3876131,0.0074245753,0.0020844033,0.14440118,0.013780876,0.2365651],"study_design_scores_gemma":[0.00004194548,0.00023222722,0.12110548,0.0009049934,0.00009110495,0.00080744346,0.78145975,0.002363316,0.0021733614,0.0052834465,0.08539989,0.0001370521],"about_ca_topic_score_codex":0.9228364,"about_ca_topic_score_gemma":0.96520287,"teacher_disagreement_score":0.117601074,"about_ca_system_score_codex":0.117601074,"about_ca_system_score_gemma":0.085290074,"threshold_uncertainty_score":0.8532595},"labels":[],"label_agreement":null},{"id":"W2072962544","doi":"10.1061/(asce)co.1943-7862.0000239","title":"Computerized DSS for Construction Conflict Resolution under Uncertainty","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Conflict resolution; Resolution (logic); Conflict analysis; Decision support system; Computer science; Dispute resolution; Graph; Operations research; Management science; Risk analysis (engineering); Engineering; Data mining; Business; Artificial intelligence; Political science; Law","score_opus":0.035427843735406486,"score_gpt":0.3063257624975377,"score_spread":0.2708979187621312,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2072962544","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05923513,0.00023830464,0.9247512,0.0005767952,0.00009918046,0.0008071366,0.0012642832,0.004130906,0.008896977],"genre_scores_gemma":[0.47539923,0.0003593189,0.5194451,0.00007139502,0.000026707596,0.0012577993,0.0009662856,0.00008859125,0.0023854934],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99847513,0.00086823374,0.00013908933,0.00013755492,0.0003284415,0.000051562045],"domain_scores_gemma":[0.9954211,0.0032535961,0.00023581675,0.0003517,0.0006589821,0.00007880302],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022953104,0.00074841944,0.0009176229,0.0012860573,0.00083425007,0.0019551022,0.0014930947,0.0010315464,0.006304373],"category_scores_gemma":[0.007878716,0.00042574617,0.0005770653,0.0014637726,0.0005960708,0.0016899117,0.00096543477,0.0010340362,0.000615169],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002508361,0.00014563357,0.0015146176,0.00023391623,0.000060945556,0.00020541584,0.00045922745,0.87675285,0.002883431,0.02783071,0.0031107336,0.08655172],"study_design_scores_gemma":[0.0000915588,0.000060628794,0.00023478808,0.000033489938,0.000019768753,0.00002744562,0.00009259435,0.983115,0.0015482018,0.008837961,0.0059160437,0.000022558697],"about_ca_topic_score_codex":0.005823862,"about_ca_topic_score_gemma":0.004686791,"teacher_disagreement_score":0.006304373,"about_ca_system_score_codex":0.0017066183,"about_ca_system_score_gemma":0.0022227005,"threshold_uncertainty_score":0.02109027},"labels":[],"label_agreement":null},{"id":"W2073363858","doi":"10.1108/ijmpb-08-2012-0051","title":"An exploratory study of project success with tools, software and methods","year":2013,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":67,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Athabasca University","funders":"","keywords":"Project management; Software project management; Computer science; Project risk management; Originality; Knowledge management; Process management; Software; Sample (material); Project management 2.0; Project management triangle; OPM3; Software development; Engineering; Systems engineering; Qualitative research; Sociology","score_opus":0.10581287612740796,"score_gpt":0.42318627941960746,"score_spread":0.3173734032921995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2073363858","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99608046,0.0000582911,0.0017174685,0.000094906245,0.0000033931171,0.00036776625,0.000037968894,0.000008336952,0.0016313227],"genre_scores_gemma":[0.9912698,0.00018492546,0.0061918916,0.00010362966,0.000007729949,0.0009629124,0.00004000472,0.000010149158,0.0012290272],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9902823,0.0073372596,0.0003544793,0.0002762801,0.0011097706,0.00063992536],"domain_scores_gemma":[0.96432805,0.02657886,0.003442628,0.0011813163,0.0025920793,0.0018770703],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011694558,0.00041805973,0.0005402255,0.0018491932,0.0027828298,0.002195862,0.00071746204,0.0005876289,0.0019750672],"category_scores_gemma":[0.030653993,0.00057992997,0.00023675825,0.0015890532,0.0017617028,0.0019042414,0.0018860983,0.0010209004,0.00029466508],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038884784,0.0035294613,0.15265812,0.0006850595,0.000031880973,0.00214902,0.7638185,0.00035006172,0.0051817643,0.003116777,0.0011779623,0.06691256],"study_design_scores_gemma":[0.00008083794,0.0061354744,0.131149,0.0004157048,0.000022267654,0.0018912195,0.83536655,0.0011933506,0.0019223106,0.0012838228,0.020484146,0.000055321234],"about_ca_topic_score_codex":0.0012858221,"about_ca_topic_score_gemma":0.0030382988,"teacher_disagreement_score":0.011694558,"about_ca_system_score_codex":0.0011450704,"about_ca_system_score_gemma":0.0024024486,"threshold_uncertainty_score":0.061847508},"labels":[],"label_agreement":null},{"id":"W2073499545","doi":"10.5539/ijms.v3n2p169","title":"An Exposition on Principals’ Influence in Real Estate Negotiation","year":2011,"lang":"en","type":"article","venue":"International Journal of Marketing Studies","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Real estate; Negotiation; Valuation (finance); Business; Estate; Surveyor; Finance; Accounting; Real estate development; Marketing; Political science; Geography; Law","score_opus":0.19492266153910145,"score_gpt":0.45284942063789513,"score_spread":0.2579267590987937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2073499545","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2393184,0.007068832,0.019533886,0.018857118,0.0005678582,0.00017359243,0.00006187575,0.000041142728,0.71437734],"genre_scores_gemma":[0.9641471,0.002283431,0.0019109126,0.00056290213,0.00022909092,0.00005506688,0.000013542989,0.000010530004,0.03078751],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9964445,0.0022760155,0.00010811949,0.00019774731,0.000492731,0.00048092508],"domain_scores_gemma":[0.99530077,0.0030892312,0.0007331489,0.00015967595,0.000394803,0.0003224546],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003248425,0.00026240063,0.00020651302,0.0009803463,0.0042170417,0.0048579103,0.0005703228,0.0012495178,0.014506197],"category_scores_gemma":[0.0052211634,0.0002626254,0.0003731896,0.0018416414,0.0033951923,0.002086582,0.0019191133,0.0015480976,0.0010668682],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000121191624,0.00034159928,0.026646413,0.000292564,0.000027281629,0.0022281252,0.13081105,0.0009109618,0.0012809467,0.76761293,0.010157426,0.05956951],"study_design_scores_gemma":[0.000060112987,0.0004430434,0.05681842,0.0007860092,0.000051124483,0.0019138743,0.14691961,0.004488866,0.0014563898,0.15977192,0.62721467,0.00007599515],"about_ca_topic_score_codex":0.0031449818,"about_ca_topic_score_gemma":0.0039437804,"teacher_disagreement_score":0.014506197,"about_ca_system_score_codex":0.0022008105,"about_ca_system_score_gemma":0.0018017739,"threshold_uncertainty_score":0.048528016},"labels":[],"label_agreement":null},{"id":"W2073834354","doi":"10.1108/mrr-05-2013-0112","title":"The relationship between project management process characteristics and performance outcomes","year":2014,"lang":"en","type":"article","venue":"Management Research Review","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; Athabasca University","funders":"","keywords":"Business; Project management; OPM3; Project management triangle; Competitive advantage; Asset (computer security); Knowledge management; Sample (material); Process management; Process (computing); Marketing; Computer science; Economics; Management","score_opus":0.41157143308798727,"score_gpt":0.5119655486940957,"score_spread":0.10039411560610845,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2073834354","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9963432,0.00006528571,0.0015642629,0.00012233146,0.0000040305003,0.000040403127,0.00009928145,0.000015408332,0.0017457346],"genre_scores_gemma":[0.99874735,0.000035121302,0.000762698,0.000010792478,0.0000063506845,0.00004460688,0.00014700639,0.000005451718,0.0002406557],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9939761,0.0025830206,0.0005654354,0.0004185645,0.0019760984,0.00048070741],"domain_scores_gemma":[0.8856968,0.04629396,0.049703795,0.003338123,0.00959832,0.005368962],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006445155,0.000294136,0.00019210327,0.0013600172,0.00037932326,0.0015069017,0.0003664643,0.00034284653,0.0031398733],"category_scores_gemma":[0.03693677,0.00015028456,0.0002920197,0.0014206553,0.0005732403,0.0010616088,0.001162038,0.0009929409,0.0004958745],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011692035,0.00045992713,0.9734718,0.00007360613,0.00006118478,0.00005667968,0.0006861209,0.0010174466,0.000608197,0.00020032238,0.00018352941,0.023064258],"study_design_scores_gemma":[0.0000050602025,0.00038496603,0.99584144,0.00002294035,0.0000127267,0.000078498546,0.0010712941,0.001116075,0.000663852,0.00024411111,0.00054891856,0.000010144753],"about_ca_topic_score_codex":0.00066330144,"about_ca_topic_score_gemma":0.0006747967,"teacher_disagreement_score":0.006445155,"about_ca_system_score_codex":0.0005793264,"about_ca_system_score_gemma":0.0009025692,"threshold_uncertainty_score":0.03408563},"labels":[],"label_agreement":null},{"id":"W2075659638","doi":"10.1179/2042645310y.0000000001","title":"South Africa's wood processing industry education strategy: north south partnership to develop a globally competitive workforce for the 21st century","year":2010,"lang":"en","type":"article","venue":"International Wood Products Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Universiteit Stellenbosch; Coordenação de Aperfeiçoamento de Pessoal de Nível Superior; Nelson Mandela University; Nelson Mandela Metropolitan University; Styrelsen för Internationellt Utvecklingssamarbete","keywords":"General partnership; Workforce; Government (linguistics); Restructuring; Metropolitan area; Competitive advantage; Business; Economic growth; Human capital; Marketing; Economics; Finance; Geography","score_opus":0.0940312282560409,"score_gpt":0.36306201899181223,"score_spread":0.2690307907357713,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2075659638","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16483605,0.014174168,0.012924334,0.37484992,0.0020941333,0.000946336,0.0005136105,0.0002861407,0.42937532],"genre_scores_gemma":[0.49341553,0.0072151492,0.020633949,0.02462729,0.000109130226,0.00039574422,0.0003657422,0.00013713764,0.45310023],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99918276,0.00020643331,0.000023877961,0.000047215737,0.00018996936,0.00034980755],"domain_scores_gemma":[0.9981554,0.00017518403,0.00012072565,0.0000629513,0.00026266905,0.0012231093],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016885551,0.0003225589,0.00010172146,0.0004874083,0.0020291563,0.002590097,0.0005421785,0.0022595709,0.01604382],"category_scores_gemma":[0.0018321344,0.00015134425,0.00017731484,0.00056365493,0.0006039151,0.0016034892,0.0031125306,0.0015363832,0.001928932],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024638275,0.00045902177,0.014431896,0.0015603331,0.00005885856,0.0024521116,0.016674254,0.0024792897,0.016491579,0.17059837,0.4150731,0.3594748],"study_design_scores_gemma":[0.000021068832,0.00003296919,0.0048679793,0.0002522435,0.0000063068724,0.00020594193,0.0032514762,0.00041622604,0.0010337931,0.0029432531,0.98695916,0.000009650625],"about_ca_topic_score_codex":0.038238212,"about_ca_topic_score_gemma":0.08450133,"teacher_disagreement_score":0.038238212,"about_ca_system_score_codex":0.0043742093,"about_ca_system_score_gemma":0.045226175,"threshold_uncertainty_score":0.07603133},"labels":[],"label_agreement":null},{"id":"W2076629732","doi":"10.1108/17538371211214897","title":"Organisational project management as a function within the organisation","year":2012,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Originality; Function (biology); Project management; Knowledge management; Context (archaeology); Process management; Management science; Sociology; Qualitative research; Computer science; Management; Business; Engineering","score_opus":0.0741281751343168,"score_gpt":0.36329455889858275,"score_spread":0.28916638376426596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2076629732","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3053384,0.010396551,0.22234294,0.04408641,0.0011163615,0.0014353818,0.00009441302,0.0002993259,0.41489023],"genre_scores_gemma":[0.9549723,0.0015684005,0.028974747,0.00088882813,0.0001658677,0.00047971116,0.0000438864,0.00006508544,0.012841141],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.95458746,0.037074875,0.0010700302,0.001419775,0.0041018715,0.0017460574],"domain_scores_gemma":[0.9592372,0.019969856,0.0041861185,0.004031268,0.0059794863,0.006596073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02527008,0.00043525695,0.0004555768,0.0024311696,0.006037593,0.015992787,0.0016287155,0.0017790891,0.0040571922],"category_scores_gemma":[0.02512028,0.00029611404,0.000437836,0.0025052465,0.017696718,0.008667354,0.0070055802,0.0027564294,0.001035035],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007905185,0.00020963814,0.0073353294,0.0009030972,0.00004686522,0.0004490949,0.118714534,0.0016700339,0.0012101025,0.6831166,0.0071764034,0.17908928],"study_design_scores_gemma":[0.000069062226,0.0006112853,0.013081608,0.0023284475,0.000051902614,0.0012200972,0.13796887,0.004439974,0.0013074125,0.35118055,0.4876149,0.00012593291],"about_ca_topic_score_codex":0.0011169481,"about_ca_topic_score_gemma":0.0007703185,"teacher_disagreement_score":0.02527008,"about_ca_system_score_codex":0.0056170207,"about_ca_system_score_gemma":0.014640572,"threshold_uncertainty_score":0.13364255},"labels":[],"label_agreement":null},{"id":"W2076864685","doi":"10.3992/jgb.5.4.78","title":"Prospecting for Silver Striking Platinum: Our First LEED Project","year":2010,"lang":"en","type":"article","venue":"Journal of Green Building","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Response Biomedical (Canada)","funders":"","keywords":"Prospecting; Architectural engineering; Platinum; Engineering; Environmental science; Environmental economics; Mining engineering; Economics; Chemistry","score_opus":0.10007929521003137,"score_gpt":0.4036332520345676,"score_spread":0.30355395682453623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2076864685","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38069832,0.0013393441,0.01601022,0.17196104,0.0057058106,0.0012728004,0.0012724247,0.0023066886,0.4194334],"genre_scores_gemma":[0.4845022,0.0012671265,0.024851989,0.019999098,0.00059933186,0.0007152816,0.0009868405,0.00089304015,0.46618512],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.99793625,0.00054233434,0.00003818982,0.00027328337,0.0006349008,0.0005750606],"domain_scores_gemma":[0.9942486,0.00031026636,0.00012537758,0.00032018241,0.000700254,0.0042953296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027046134,0.0004467412,0.0003061132,0.0006119611,0.0124223875,0.006558033,0.001733949,0.0040386356,0.038551554],"category_scores_gemma":[0.004688818,0.0005804595,0.00041205584,0.0003786644,0.0028577526,0.0034233353,0.010062334,0.005316667,0.008709902],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002487563,0.001374125,0.0101641975,0.00017917738,0.000018237422,0.0074957917,0.022674704,0.00038041055,0.0036184283,0.02677994,0.74056673,0.18649946],"study_design_scores_gemma":[0.000027801061,0.00052637164,0.005446731,0.00011901529,0.000008030197,0.0014864278,0.028415898,0.00033106218,0.0017236739,0.0050909426,0.95677847,0.00004542679],"about_ca_topic_score_codex":0.005595558,"about_ca_topic_score_gemma":0.026777428,"teacher_disagreement_score":0.038551554,"about_ca_system_score_codex":0.0036683448,"about_ca_system_score_gemma":0.008287353,"threshold_uncertainty_score":0.12896776},"labels":[],"label_agreement":null},{"id":"W2078068035","doi":"10.1080/01446193.2013.825044","title":"Understanding differences in construction project governance between developed and developing countries","year":2013,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Université de Montréal","funders":"","keywords":"Structuring; Developing country; Corporate governance; Project governance; Order (exchange); Business; Knowledge management; Public relations; Process management; Political science; Economic growth; Computer science; Economics; Finance","score_opus":0.2182641771756977,"score_gpt":0.30688361482893795,"score_spread":0.08861943765324024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078068035","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9778952,0.0015821253,0.002831589,0.00091412995,0.000009712751,0.000035965346,0.000067827954,0.000004293814,0.016659148],"genre_scores_gemma":[0.9984669,0.0007489804,0.00053161796,0.000052476687,0.0000018295859,0.000014643382,0.000028595148,0.0000015400811,0.00015337697],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9965552,0.001922036,0.00029908557,0.00021423434,0.00041432623,0.0005950052],"domain_scores_gemma":[0.99533206,0.0024194582,0.0011830092,0.0002729878,0.00051450025,0.0002780777],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046110144,0.00014821251,0.00024787794,0.0018057551,0.00086248777,0.0024855009,0.00026019142,0.00029352,0.0009129272],"category_scores_gemma":[0.009810127,0.00019651027,0.00013888898,0.0033207578,0.002578855,0.0021145158,0.0019668299,0.00042802255,0.00007273598],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021744914,0.00010681436,0.6009593,0.0006256321,0.00008033169,0.0011692132,0.16753474,0.00295818,0.002356032,0.0997058,0.0012134264,0.12307308],"study_design_scores_gemma":[0.000016793123,0.00014644674,0.7456522,0.0006505154,0.000033944852,0.00064819126,0.21377547,0.0010568346,0.0007276296,0.013864921,0.023394847,0.000032139535],"about_ca_topic_score_codex":0.006465137,"about_ca_topic_score_gemma":0.0074056704,"teacher_disagreement_score":0.006465137,"about_ca_system_score_codex":0.0017690555,"about_ca_system_score_gemma":0.0016786667,"threshold_uncertainty_score":0.02438569},"labels":[],"label_agreement":null},{"id":"W2078444904","doi":"10.1590/s1415-65552011000300007","title":"A relação da comunicação e gestão de obras como um processo de transformação conversações/textos","year":2011,"lang":"pt","type":"article","venue":"Revista de Administração Contemporânea","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Michel foucault; Humanities; Philosophy; Sociology; Political science; Politics","score_opus":0.19308545341831787,"score_gpt":0.3723695182867833,"score_spread":0.1792840648684654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078444904","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16258101,0.009290648,0.35361427,0.023433471,0.0020469632,0.00057953026,0.0009636706,0.0016500806,0.4458404],"genre_scores_gemma":[0.82561016,0.0059038643,0.0786242,0.0016257497,0.0007046421,0.00053439895,0.0005464779,0.0009011813,0.08554926],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9921017,0.0043404205,0.00040236156,0.0010799284,0.001605828,0.00046969356],"domain_scores_gemma":[0.98787445,0.0071519176,0.00095740985,0.0020848012,0.0014239335,0.0005075768],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005349464,0.0011308651,0.00069844833,0.0031259446,0.004845037,0.019420983,0.0018632866,0.0030895935,0.018588668],"category_scores_gemma":[0.016934358,0.0006125485,0.0011065128,0.0048523815,0.010382086,0.015077428,0.007446512,0.003308609,0.00373971],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026185394,0.00012303673,0.0065193535,0.0015188454,0.00005556113,0.001707323,0.19118923,0.0024032001,0.010195815,0.6362454,0.0114451,0.1383353],"study_design_scores_gemma":[0.000044832235,0.00024985414,0.008284459,0.0015158928,0.00014060663,0.0018416194,0.12813605,0.009579459,0.00843814,0.21223095,0.62935984,0.00017823993],"about_ca_topic_score_codex":0.00726964,"about_ca_topic_score_gemma":0.005999246,"teacher_disagreement_score":0.019420983,"about_ca_system_score_codex":0.0034218035,"about_ca_system_score_gemma":0.003977554,"threshold_uncertainty_score":0.062185287},"labels":[],"label_agreement":null},{"id":"W2078738099","doi":"10.1108/13664381211211064","title":"Major causes of problems between contractors and subcontractors in the Gaza Strip","year":2012,"lang":"en","type":"article","venue":"Journal of Financial Management of Property and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":58,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SAIT Polytechnic","funders":"","keywords":"Viewpoints; Payment; Gaza strip; Test (biology); Schedule; Construction industry; Quality (philosophy); Work (physics); Operations management; Construction contract; Business; Questionnaire; Reliability (semiconductor); Engineering; Marketing; Contract management; Finance; Construction engineering; Management; Economics; Palestine; Mathematics","score_opus":0.0697321696090072,"score_gpt":0.30560413907146144,"score_spread":0.23587196946245426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078738099","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9906093,0.004435607,0.00028402885,0.0014475196,0.00003111263,0.000045943696,0.00008788245,0.000013725395,0.0030450465],"genre_scores_gemma":[0.9970476,0.0014144661,0.00033074984,0.0002088561,0.000011308813,0.000026631717,0.000076660035,0.000004184891,0.0008795863],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99524647,0.0016996951,0.0006054872,0.00042353646,0.0011209759,0.0009039914],"domain_scores_gemma":[0.9902473,0.0029616836,0.0045392066,0.0002360597,0.0010897826,0.0009258338],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034502742,0.0005200838,0.00036820158,0.0027449606,0.004042249,0.0027376956,0.0012399015,0.0012425416,0.003939518],"category_scores_gemma":[0.00792201,0.00056100346,0.00032859805,0.0040859035,0.0020525467,0.0013296391,0.0022684594,0.0008302408,0.00032793803],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022640327,0.00016542422,0.8144684,0.0009616849,0.000079701815,0.008511104,0.08069044,0.00024728847,0.0015535773,0.0011839649,0.0029607522,0.08895132],"study_design_scores_gemma":[0.000015214851,0.0001969751,0.6355383,0.0005034689,0.000037856094,0.0042821183,0.3428243,0.00029147396,0.00035267678,0.00036913378,0.01554679,0.000041719377],"about_ca_topic_score_codex":0.024788471,"about_ca_topic_score_gemma":0.026277127,"teacher_disagreement_score":0.024788471,"about_ca_system_score_codex":0.0037296326,"about_ca_system_score_gemma":0.004666777,"threshold_uncertainty_score":0.049288392},"labels":[],"label_agreement":null},{"id":"W2079252750","doi":"10.1016/j.ijproman.2011.03.005","title":"Critical success factors for World Bank projects: An empirical investigation","year":2011,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":442,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; Université du Québec en Outaouais","funders":"","keywords":"Critical success factor; Construct (python library); Project charter; Exploratory factor analysis; Engineering; Process management; Business; Project management triangle; Project management; Knowledge management; Engineering management; Marketing; Computer science; Systems engineering","score_opus":0.2891634443338784,"score_gpt":0.46383666571972715,"score_spread":0.17467322138584873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2079252750","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99545455,0.00016843555,0.00022241658,0.00012779803,0.0000038082044,0.000060090828,0.00013575866,0.000005360287,0.0038217537],"genre_scores_gemma":[0.99912447,0.00014113217,0.00022334239,0.000011699101,0.000004470941,0.00006105422,0.00009581262,0.0000051883612,0.00033274203],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99738246,0.0011472866,0.00022177455,0.00012292663,0.0006986863,0.0004269709],"domain_scores_gemma":[0.8580938,0.08903282,0.026876286,0.0020346786,0.011776575,0.012185844],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00520917,0.00055425824,0.00032768145,0.005959792,0.0018855778,0.0030922631,0.0006798889,0.0008086621,0.0054017687],"category_scores_gemma":[0.055660456,0.00045574098,0.00032911944,0.006059655,0.0014069102,0.0017278534,0.0011501549,0.0016307941,0.0005699701],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029647644,0.00069333334,0.97450054,0.00009874328,0.00004647935,0.0003286543,0.005547629,0.00035137174,0.00022175792,0.0015154252,0.0011183037,0.0152813485],"study_design_scores_gemma":[0.0000211728,0.00020832793,0.9832124,0.00010872233,0.000044615983,0.00016810796,0.012925357,0.0010359029,0.00025787062,0.00054869906,0.0014498247,0.000018962497],"about_ca_topic_score_codex":0.014494013,"about_ca_topic_score_gemma":0.021407679,"teacher_disagreement_score":0.014494013,"about_ca_system_score_codex":0.0036960754,"about_ca_system_score_gemma":0.0045509026,"threshold_uncertainty_score":0.028819263},"labels":[],"label_agreement":null},{"id":"W2080504526","doi":"10.1108/17538370910971054","title":"The use of partnering as a conflict prevention method in large‐scale urban projects in Canada","year":2009,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université de Montréal","funders":"","keywords":"Scale (ratio); Real estate; Business; Urban planning; General partnership; Revenue; Environmental planning; Regional science; Operations management; Marketing; Sociology; Finance; Economics; Geography; Civil engineering; Engineering; Cartography","score_opus":0.1248884081699314,"score_gpt":0.3971228172746275,"score_spread":0.2722344091046961,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2080504526","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9764913,0.0002410651,0.0034965237,0.0009591592,0.00002492586,0.00030810712,0.000045549325,0.00005388316,0.01837961],"genre_scores_gemma":[0.99300003,0.00016847928,0.003741971,0.000052434814,0.000002894338,0.00007897911,0.00002127588,0.0000068038844,0.0029271394],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9979468,0.0012537322,0.000037979713,0.00013492253,0.00026092757,0.00036577246],"domain_scores_gemma":[0.9963356,0.00085298816,0.00028819474,0.00021200291,0.0006241907,0.001687055],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025099386,0.00023104537,0.00016034234,0.0005686092,0.0069390754,0.0015228913,0.0008652882,0.0003431022,0.004449748],"category_scores_gemma":[0.005598865,0.0001949947,0.0001468495,0.001010027,0.0011615603,0.0006153645,0.001922749,0.00059610035,0.0002467473],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007922071,0.0033672734,0.1746669,0.00032745072,0.000053666023,0.001458949,0.06823807,0.0046713175,0.005873646,0.008311715,0.010194205,0.7220445],"study_design_scores_gemma":[0.00037568962,0.003942553,0.5664779,0.0004541191,0.00017956879,0.001530769,0.21425726,0.02166732,0.008981967,0.0032732235,0.17858437,0.0002752397],"about_ca_topic_score_codex":0.6608447,"about_ca_topic_score_gemma":0.8792612,"teacher_disagreement_score":0.33915532,"about_ca_system_score_codex":0.008564442,"about_ca_system_score_gemma":0.027602224,"threshold_uncertainty_score":0.68230534},"labels":[],"label_agreement":null},{"id":"W2080731462","doi":"10.4236/ti.2014.51006","title":"Collaborative Meeting as an Integrative Mechanism in a Multinational Investment Project","year":2014,"lang":"en","type":"article","venue":"Technology and Investment","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Multinational corporation; Context (archaeology); Mechanism (biology); Knowledge management; Project management; Investment (military); Process management; Work (physics); Business; Computer science; Political science; Engineering; Systems engineering","score_opus":0.027911398434910993,"score_gpt":0.34456202733580743,"score_spread":0.31665062890089646,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2080731462","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9172661,0.0003019546,0.04708851,0.0013128988,0.000031579224,0.00028853433,0.000014632969,0.00009713904,0.033598743],"genre_scores_gemma":[0.991167,0.000072853305,0.007902528,0.000028606157,0.000008506175,0.000052802974,0.0000066305256,0.000007878579,0.0007532483],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.96881706,0.024682388,0.00080979837,0.0013044523,0.0029617085,0.0014246344],"domain_scores_gemma":[0.9730907,0.016875809,0.004620208,0.0018141423,0.0012446059,0.002354531],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016309598,0.00053761166,0.0003540598,0.0020254652,0.0056420956,0.006757764,0.0017260319,0.0015920807,0.0020836687],"category_scores_gemma":[0.026911194,0.00044178512,0.00040272856,0.0015797383,0.0066296756,0.004988074,0.007907684,0.0016490741,0.00027962276],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00090526417,0.0010114238,0.050278127,0.00080019824,0.00017372171,0.006344346,0.5890389,0.009529966,0.013698293,0.110869795,0.0019464847,0.21540344],"study_design_scores_gemma":[0.00021610958,0.0027259488,0.06431519,0.00082505535,0.00026646885,0.0043400973,0.7342361,0.035878178,0.0090890955,0.06241354,0.08531406,0.00038016753],"about_ca_topic_score_codex":0.0013040972,"about_ca_topic_score_gemma":0.0014055176,"teacher_disagreement_score":0.016309598,"about_ca_system_score_codex":0.0023426153,"about_ca_system_score_gemma":0.0032021925,"threshold_uncertainty_score":0.08625448},"labels":[],"label_agreement":null},{"id":"W2081139813","doi":"10.1139/l07-127","title":"Contractor selection: fuzzy-control approach","year":2008,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":55,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministerio de Fomento","keywords":"Selection (genetic algorithm); Fuzzy logic; Computer science; Quality (philosophy); Control (management); Process (computing); Delphi method; Risk analysis (engineering); Artificial neural network; Operations research; Engineering; Machine learning; Artificial intelligence; Business","score_opus":0.03745142387629744,"score_gpt":0.2444472947748572,"score_spread":0.20699587089855975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2081139813","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009348349,0.00019060713,0.9778025,0.00028611498,0.000048298392,0.00022782855,0.000034725737,0.00028202348,0.011779501],"genre_scores_gemma":[0.7448316,0.00038261616,0.24421772,0.00017578057,0.00008127984,0.00048522864,0.00008585353,0.000056180696,0.009683809],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99749243,0.00089862273,0.00014404958,0.00038495738,0.0009038294,0.00017614485],"domain_scores_gemma":[0.99819726,0.0009556973,0.00015415871,0.00007978687,0.00054040406,0.0000726905],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003730334,0.0009998379,0.0009455312,0.0017974499,0.0011393923,0.002499783,0.0020956194,0.0013886284,0.0047554323],"category_scores_gemma":[0.005007406,0.00041398627,0.00067939726,0.0011518279,0.0012979914,0.0011786585,0.0008480072,0.0009212273,0.00053059956],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020205158,0.0002711709,0.0015322925,0.0003121387,0.00010912181,0.00026539748,0.00058193936,0.7241363,0.0044096266,0.087871656,0.0022484043,0.17805992],"study_design_scores_gemma":[0.000028947197,0.000047991398,0.0001629194,0.00002757305,0.000017610757,0.00002434137,0.00005406625,0.9848203,0.0011876592,0.011628172,0.00198003,0.000020317058],"about_ca_topic_score_codex":0.017364286,"about_ca_topic_score_gemma":0.009176678,"teacher_disagreement_score":0.017364286,"about_ca_system_score_codex":0.0023961233,"about_ca_system_score_gemma":0.0021429833,"threshold_uncertainty_score":0.034526467},"labels":[],"label_agreement":null},{"id":"W2085633048","doi":"10.3141/2151-06","title":"Framework for Performance-Based Contractor Prequalification","year":2010,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bidding; Integrated project delivery; Construction management; Operations management; Engineering; Project management; Transport engineering; Engineering management; Business; Marketing; Systems engineering; Civil engineering","score_opus":0.28639789754058526,"score_gpt":0.492538741737992,"score_spread":0.20614084419740675,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2085633048","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021002367,0.0016826631,0.73313355,0.033923887,0.00056965975,0.008056323,0.00032042968,0.00031636845,0.20099473],"genre_scores_gemma":[0.36001167,0.0010262816,0.61113155,0.003219211,0.00022926611,0.007499202,0.0005742469,0.00010522029,0.01620337],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.91825557,0.052897286,0.0058492967,0.005026445,0.0127147045,0.005256661],"domain_scores_gemma":[0.95473826,0.019543257,0.0040380494,0.0039711315,0.0138236815,0.0038856845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.08962651,0.0013017965,0.00069035887,0.0073573096,0.0072483933,0.010422021,0.00419376,0.004944754,0.0042668465],"category_scores_gemma":[0.05587403,0.00086902245,0.0013707705,0.00471245,0.021752631,0.008475824,0.0073758485,0.0070815063,0.0015156124],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001739005,0.00016854219,0.00281611,0.00016283875,0.000009030197,0.00022010198,0.017116606,0.0020136004,0.00026967944,0.93264455,0.005589935,0.038971562],"study_design_scores_gemma":[0.0001030009,0.00027498908,0.007825616,0.0026358815,0.000028304887,0.0005012264,0.02878105,0.01122589,0.0011780674,0.53635955,0.4108542,0.0002322514],"about_ca_topic_score_codex":0.032965988,"about_ca_topic_score_gemma":0.024990378,"teacher_disagreement_score":0.08962651,"about_ca_system_score_codex":0.025682978,"about_ca_system_score_gemma":0.05021525,"threshold_uncertainty_score":0.47399598},"labels":[],"label_agreement":null},{"id":"W2086865785","doi":"10.3846/13923730.2012.671279","title":"UTILIZING RANDOM PERFORMANCE RECORDS IN THE BEST VALUE MODEL / ATSITIKTINE TVARKA PARINKTŲ VEIKLOS EFEKTYVUMO DUOMENŲ NAUDOJIMAS GERIAUSIOS VERTĖS MODELYJE","year":2012,"lang":"en","type":"article","venue":"Journal of Civil Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Quality (philosophy); Selection (genetic algorithm); Computer science; Operations research; Operations management; Engineering","score_opus":0.05173247523916368,"score_gpt":0.2922836307645013,"score_spread":0.24055115552533762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2086865785","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.114976086,0.0007151883,0.86840427,0.0006326022,0.00009166247,0.00039190036,0.00048762045,0.000370468,0.0139302015],"genre_scores_gemma":[0.8968776,0.00073135167,0.0875416,0.00008357251,0.000043362634,0.0006834255,0.0006792831,0.0000974692,0.013262304],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976609,0.00106879,0.00010986708,0.00041678437,0.0005236509,0.00022004127],"domain_scores_gemma":[0.99690324,0.0020151108,0.0003853925,0.00014433486,0.0004926289,0.0000593356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038876105,0.0011245662,0.0012850894,0.0015379771,0.0006093979,0.0035238587,0.0019892314,0.0015438242,0.0032071641],"category_scores_gemma":[0.0070989085,0.0007098514,0.0014204673,0.0012204383,0.0008536267,0.0020018942,0.001169052,0.0017447883,0.0005982949],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007971428,0.000109717046,0.0032402016,0.00007028382,0.000050806462,0.00008092922,0.00008876145,0.96667296,0.00046757568,0.013384948,0.00034294443,0.015411284],"study_design_scores_gemma":[0.000007508148,0.000058175687,0.0005009745,0.000024190786,0.00001832137,0.00001519618,0.000035061832,0.9950995,0.00032598563,0.0032410433,0.000659906,0.000014249049],"about_ca_topic_score_codex":0.014218234,"about_ca_topic_score_gemma":0.009141937,"teacher_disagreement_score":0.014218234,"about_ca_system_score_codex":0.0019309848,"about_ca_system_score_gemma":0.0022682825,"threshold_uncertainty_score":0.02827096},"labels":[],"label_agreement":null},{"id":"W2087639512","doi":"10.1002/pmj.20165","title":"Measuring Portfolio Strategic Performance Using Key Performance Indicators","year":2010,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":72,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Portfolio; Key (lock); Performance indicator; Process management; Application portfolio management; Performance measurement; Project portfolio management; Risk analysis (engineering); Business; Computer science; Management science; Systems engineering; Engineering; Project management; Finance; Marketing","score_opus":0.17144042907901008,"score_gpt":0.35282433067112673,"score_spread":0.18138390159211665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2087639512","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6057859,0.0017970909,0.3061164,0.0011138149,0.0002841337,0.0013263663,0.0040020603,0.0011886572,0.07838551],"genre_scores_gemma":[0.8970245,0.0011057731,0.09635006,0.00006216819,0.000057946574,0.0006225229,0.002743217,0.000059854337,0.0019739638],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9868286,0.003183898,0.0020154975,0.0005595001,0.0067607844,0.0006515876],"domain_scores_gemma":[0.9645608,0.01165669,0.008992358,0.0014705781,0.012005828,0.0013138093],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012480793,0.0013164994,0.00089157815,0.010018747,0.00068422745,0.003935157,0.00074271875,0.0006412361,0.0018621659],"category_scores_gemma":[0.037522074,0.00022581365,0.0005732114,0.012280259,0.00052770774,0.0046991818,0.001964209,0.0009372722,0.00080309843],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00053273496,0.0007097323,0.3495677,0.0012577864,0.00040030712,0.00018640047,0.0021069383,0.035709053,0.007839387,0.028360985,0.007771462,0.5655575],"study_design_scores_gemma":[0.00014072521,0.0056949756,0.6410632,0.001293972,0.00055309886,0.00070168346,0.009955718,0.18077253,0.05371349,0.04804961,0.057357546,0.0007035087],"about_ca_topic_score_codex":0.0020220887,"about_ca_topic_score_gemma":0.0019105033,"teacher_disagreement_score":0.012480793,"about_ca_system_score_codex":0.0017507367,"about_ca_system_score_gemma":0.0020750712,"threshold_uncertainty_score":0.06600553},"labels":[],"label_agreement":null},{"id":"W2089069119","doi":"10.1080/15623599.2006.10773089","title":"Value in Construction: An International Study","year":2006,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Value (mathematics); Stakeholder; Theme (computing); Business; Construction industry; Public relations; Questionnaire; Marketing; Engineering; Political science; Sociology; Social science; Computer science","score_opus":0.04510775502772745,"score_gpt":0.3789012302370778,"score_spread":0.3337934752093503,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2089069119","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6051496,0.012422254,0.0028809162,0.005656298,0.00024482358,0.00006142995,0.00011760354,0.000011666826,0.37345538],"genre_scores_gemma":[0.99059427,0.0050400663,0.00035641543,0.00019962518,0.000045880824,0.000024267658,0.00003700115,0.000011632906,0.0036906789],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.99590814,0.0021902341,0.00018755336,0.00031018848,0.00076293584,0.00064091024],"domain_scores_gemma":[0.99118805,0.004755883,0.0012388236,0.00060248584,0.001198333,0.0010164293],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005974055,0.00033674567,0.0003413105,0.003899967,0.0041681877,0.008331921,0.00045719408,0.0008797554,0.0050623394],"category_scores_gemma":[0.0077799433,0.00022433572,0.0002604776,0.012332835,0.007778327,0.005546284,0.004174734,0.002010657,0.00041508046],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003176978,0.00062942214,0.09290281,0.0008583365,0.00004423867,0.0017293855,0.3593922,0.0007398628,0.0010431568,0.31867942,0.011203456,0.21246009],"study_design_scores_gemma":[0.000017541819,0.00031999373,0.14100476,0.0014572995,0.00003556837,0.0017216004,0.44138005,0.0005476923,0.0008043694,0.020057805,0.39260924,0.00004409466],"about_ca_topic_score_codex":0.004892604,"about_ca_topic_score_gemma":0.0068068835,"teacher_disagreement_score":0.008331921,"about_ca_system_score_codex":0.00549141,"about_ca_system_score_gemma":0.003366699,"threshold_uncertainty_score":0.039843142},"labels":[],"label_agreement":null},{"id":"W2089076385","doi":"10.1504/ijpom.2011.038864","title":"Relations intra- and inter-organisations for the study of the temporary multi-organisation in construction projects","year":2011,"lang":"en","type":"article","venue":"International Journal of Project Organisation and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université de Montréal","funders":"","keywords":"Procurement; Business; Construction industry; Knowledge management; Process management; Project manager; Public relations; Organisational change; Project management; Marketing; Management; Engineering; Political science; Computer science","score_opus":0.1290511418213977,"score_gpt":0.3568477125299077,"score_spread":0.22779657070851,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2089076385","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8354397,0.0063607646,0.042502932,0.003923059,0.00008098717,0.00034373687,0.0001200966,0.000023249595,0.11120547],"genre_scores_gemma":[0.98955345,0.0014709042,0.0056254524,0.00012277452,0.000014507939,0.00019090717,0.000025342479,0.000011922473,0.0029847373],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99196446,0.0059394646,0.0001921314,0.000260955,0.0009439459,0.0006989081],"domain_scores_gemma":[0.9923619,0.0050828694,0.0011729987,0.0003935881,0.0004110637,0.00057748664],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00444257,0.0001856147,0.00023287216,0.0016744982,0.0071777687,0.0061466824,0.0007333139,0.0009614323,0.00368455],"category_scores_gemma":[0.0076439604,0.00027880288,0.00024290029,0.005288295,0.012067023,0.0036249545,0.0042335833,0.0016970218,0.00035631206],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007187107,0.00014476503,0.066266134,0.00061349635,0.00003186584,0.0017933659,0.46749482,0.0017661205,0.0021593764,0.3510944,0.0019768674,0.10658696],"study_design_scores_gemma":[0.000011717491,0.00012065366,0.14710136,0.0008578221,0.000032199896,0.0015611401,0.64374965,0.0018641773,0.0007813345,0.057389386,0.14647274,0.000057827852],"about_ca_topic_score_codex":0.027215518,"about_ca_topic_score_gemma":0.051112138,"teacher_disagreement_score":0.027215518,"about_ca_system_score_codex":0.0069098985,"about_ca_system_score_gemma":0.008717593,"threshold_uncertainty_score":0.054114223},"labels":[],"label_agreement":null},{"id":"W2089830378","doi":"10.1061/(asce)0733-9364(2005)131:1(42)","title":"Fuzzy Logic Approach for Activity Delay Analysis and Schedule Updating","year":2004,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":82,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Schedule; Fuzzy logic; Computer science; Relevance (law); Scheduling (production processes); Operations research; Logic model; Industrial engineering; Reliability engineering; Systems engineering; Artificial intelligence; Engineering; Operations management","score_opus":0.031851007892089396,"score_gpt":0.2972117784881596,"score_spread":0.2653607705960702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2089830378","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002790982,0.0001372318,0.9932033,0.00010923327,0.000033763685,0.000048566042,0.00008348515,0.00015163107,0.0034418192],"genre_scores_gemma":[0.2926862,0.0009415919,0.6975049,0.00013636438,0.00014655065,0.00038880936,0.0003859063,0.00007588532,0.007733854],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987446,0.0003511422,0.000090644324,0.00022595315,0.0004845291,0.00010305364],"domain_scores_gemma":[0.9985176,0.00084051123,0.00018796803,0.00007873307,0.00032847992,0.000046671383],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020692537,0.0010982555,0.00089123077,0.0019548342,0.00086698664,0.002060289,0.0021781435,0.0013480271,0.004078723],"category_scores_gemma":[0.004420558,0.0006089009,0.0013342777,0.0016967867,0.0007592852,0.0020843262,0.00067681,0.0016249833,0.00080395304],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000073670206,0.00006783594,0.0006584354,0.00009607755,0.000052576514,0.00013246392,0.0001768703,0.8530269,0.0014322184,0.07841665,0.0010676364,0.064798646],"study_design_scores_gemma":[0.000014389677,0.000028943357,0.00009189543,0.000017025,0.000022642804,0.00003277101,0.00002489851,0.97294486,0.00048881763,0.023408236,0.0029043937,0.000021129077],"about_ca_topic_score_codex":0.02236094,"about_ca_topic_score_gemma":0.014766207,"teacher_disagreement_score":0.02236094,"about_ca_system_score_codex":0.0030489347,"about_ca_system_score_gemma":0.0026527706,"threshold_uncertainty_score":0.044461608},"labels":[],"label_agreement":null},{"id":"W2090413280","doi":"10.1016/j.proeng.2011.07.247","title":"The Predictability of Fast-Track Projects","year":2011,"lang":"en","type":"article","venue":"Procedia Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Predictability; Tracking (education); Variance (accounting); Computer science; Quality (philosophy); Operations research; Engineering; Statistics; Business; Mathematics; Accounting","score_opus":0.0909697146033854,"score_gpt":0.2913962836838835,"score_spread":0.20042656908049808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2090413280","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9285841,0.0012544959,0.051668055,0.0004897476,0.00004701873,0.00010930421,0.00032435995,0.00010951843,0.0174133],"genre_scores_gemma":[0.9968772,0.000287356,0.0022168155,0.000009628291,0.000015403333,0.000027386603,0.00008972333,0.000012526274,0.00046393365],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9958919,0.00093335746,0.00035266843,0.0002811943,0.0022750124,0.00026575555],"domain_scores_gemma":[0.9506917,0.024918122,0.015782552,0.001779066,0.0057747657,0.0010537623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0043763197,0.00021900248,0.000282915,0.0020264932,0.0005413778,0.002241926,0.00039383306,0.00038447912,0.0017183111],"category_scores_gemma":[0.040017482,0.00022100637,0.00035399888,0.0020218657,0.00058618624,0.0017194853,0.001319369,0.0005374208,0.0002090391],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031349377,0.00013156864,0.7088918,0.00045955222,0.00022157651,0.00071050285,0.0018776648,0.07939769,0.0026606836,0.023028225,0.0017795406,0.1805277],"study_design_scores_gemma":[0.000034632783,0.0007048465,0.8933691,0.00025972558,0.00014945869,0.00065214915,0.0038078048,0.059937514,0.0034250955,0.029465161,0.008098256,0.00009623806],"about_ca_topic_score_codex":0.002692504,"about_ca_topic_score_gemma":0.0034485024,"teacher_disagreement_score":0.0043763197,"about_ca_system_score_codex":0.0011664173,"about_ca_system_score_gemma":0.0018084017,"threshold_uncertainty_score":0.023144484},"labels":[],"label_agreement":null},{"id":"W2090803517","doi":"10.1108/13598541011068279","title":"A case study of multi‐team communications in construction design under supply chain partnering","year":2010,"lang":"en","type":"article","venue":"Supply Chain Management An International Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":93,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Supply chain; Procurement; Supply chain management; General partnership; Process management; Business; Originality; Process (computing); Questionnaire; Project team; Knowledge management; Operations management; Marketing; Computer science; Engineering; Qualitative research","score_opus":0.14851161292064108,"score_gpt":0.41202973250396496,"score_spread":0.2635181195833239,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2090803517","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9634416,0.0001518232,0.020674022,0.001229419,0.00004366179,0.0003558628,0.000030206249,0.00003980113,0.014033641],"genre_scores_gemma":[0.9877841,0.00013584633,0.008369035,0.00008639638,0.000018509216,0.00015470301,0.000016776277,0.000014250856,0.003420491],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9814186,0.014347807,0.00048207655,0.0006456529,0.0018618784,0.001243896],"domain_scores_gemma":[0.9744769,0.016879369,0.002210976,0.0019978506,0.0015495061,0.0028852958],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009593808,0.0006468595,0.00050825265,0.00163497,0.010850265,0.0035695864,0.0020601,0.004117235,0.004595988],"category_scores_gemma":[0.015250884,0.00067987107,0.00074816734,0.0017432251,0.0042428337,0.0023581258,0.0039021333,0.0026934992,0.00061417394],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014655865,0.0068285055,0.074520804,0.0013110786,0.00020522073,0.1720636,0.5111012,0.035374794,0.009937559,0.05028292,0.0068925614,0.13001618],"study_design_scores_gemma":[0.00047085545,0.0058377995,0.033864714,0.0005974937,0.00018445807,0.04025045,0.7349562,0.061662927,0.013275909,0.019460762,0.08918823,0.00025013302],"about_ca_topic_score_codex":0.0036697255,"about_ca_topic_score_gemma":0.0074882386,"teacher_disagreement_score":0.010850265,"about_ca_system_score_codex":0.0037692667,"about_ca_system_score_gemma":0.0033609122,"threshold_uncertainty_score":0.05073756},"labels":[],"label_agreement":null},{"id":"W2092062565","doi":"10.1139/l07-004","title":"Impact of occasional overtime on construction labor productivity: quantitative analysis","year":2007,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Overtime; Productivity; Wilcoxon signed-rank test; Statistical analysis; Operations management; Labour economics; Engineering; Economics; Statistics; Mathematics","score_opus":0.03894224711458456,"score_gpt":0.3289970922496764,"score_spread":0.29005484513509183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2092062565","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9889254,0.00012198676,0.004853527,0.000044065255,0.000009677709,0.0003957561,0.0015775281,0.000033206066,0.004038845],"genre_scores_gemma":[0.9949142,0.00007950322,0.002662199,0.000011554105,0.000014517685,0.000577562,0.00063498755,0.0000112704065,0.0010942953],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9893668,0.0037055474,0.0008369739,0.0004861353,0.0051311394,0.00047321236],"domain_scores_gemma":[0.88265663,0.09598094,0.009392452,0.002537773,0.008575773,0.000856442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007002953,0.00047709967,0.0004377732,0.0033434057,0.00045124395,0.0007795603,0.0006894919,0.00038992063,0.004849987],"category_scores_gemma":[0.029870685,0.00020573004,0.0008425279,0.003505432,0.0010201231,0.0006398524,0.0008934337,0.00059695914,0.00044058292],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0038483306,0.0032954302,0.7137313,0.002369851,0.0005865083,0.00067589915,0.0074916678,0.04300262,0.014141703,0.0017365383,0.0017336672,0.20738654],"study_design_scores_gemma":[0.0000599606,0.0062842187,0.9670311,0.0000794595,0.00015646662,0.00023244813,0.004273234,0.012766141,0.005606292,0.00087467587,0.0025519005,0.00008393414],"about_ca_topic_score_codex":0.0019092625,"about_ca_topic_score_gemma":0.002601142,"teacher_disagreement_score":0.007002953,"about_ca_system_score_codex":0.0013635072,"about_ca_system_score_gemma":0.0011794773,"threshold_uncertainty_score":0.037035584},"labels":[],"label_agreement":null},{"id":"W2092126775","doi":"10.1115/ipc2014-33515","title":"Why Projects Fail (and What We Can Do About It)","year":2014,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Stantec (Canada)","funders":"","keywords":"Schedule; Root cause; Project management; Project risk management; Root (linguistics); Operations management; Risk management; Project manager; Risk analysis (engineering); Business; Empirical evidence; Variance (accounting); Project management triangle; Computer science; Engineering; Finance; Accounting; Systems engineering","score_opus":0.07025150456237077,"score_gpt":0.3370842737114789,"score_spread":0.26683276914910814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2092126775","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044875436,0.10999358,0.010884054,0.7713348,0.007872361,0.00021789168,0.0013841282,0.0006233031,0.052814376],"genre_scores_gemma":[0.6586032,0.19018233,0.0136368545,0.1036347,0.00428009,0.0005964842,0.0012592972,0.00089618075,0.026910895],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.97831875,0.0076589123,0.0015474894,0.0019524915,0.0071099093,0.0034124195],"domain_scores_gemma":[0.93638366,0.021900097,0.010058415,0.0028548418,0.021046631,0.0077564204],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016531395,0.00092157855,0.0008790871,0.0033181168,0.0045767785,0.019544328,0.0028650027,0.006148162,0.0102260485],"category_scores_gemma":[0.086481206,0.0008971406,0.0009113003,0.0047012004,0.011498774,0.0198626,0.0052126385,0.00747988,0.005060586],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011427478,0.00023174034,0.06566226,0.0047888434,0.00024699068,0.0012420361,0.023554502,0.001626501,0.0005198515,0.087175414,0.4120336,0.402804],"study_design_scores_gemma":[0.000048270547,0.00022263311,0.08565657,0.014761514,0.00015041744,0.0015622515,0.110075176,0.0010420737,0.00080729637,0.18127914,0.6040406,0.00035396192],"about_ca_topic_score_codex":0.020251771,"about_ca_topic_score_gemma":0.020182678,"teacher_disagreement_score":0.020251771,"about_ca_system_score_codex":0.0074347914,"about_ca_system_score_gemma":0.018538406,"threshold_uncertainty_score":0.08742738},"labels":[],"label_agreement":null},{"id":"W2094524437","doi":"10.1080/10286608.2013.784455","title":"Special issue: papers selected from the Sixth International Forum on Engineering Decision Making (IFED)","year":2013,"lang":"en","type":"article","venue":"Civil Engineering and Environmental Systems","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Engineering; Engineering management; Engineering ethics; Management science; Library science; Civil engineering; Computer science","score_opus":0.009489419476177558,"score_gpt":0.2153079872961793,"score_spread":0.20581856782000174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2094524437","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00047295378,0.039423898,0.0011904539,0.049770944,0.848595,0.00041527575,0.0037490048,0.00031869035,0.05606381],"genre_scores_gemma":[0.0049774665,0.039148696,0.0013114521,0.014576962,0.5454945,0.0006098854,0.0070241503,0.00075050246,0.38610634],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9963246,0.0004253123,0.00037543147,0.00046090578,0.0019663053,0.00044747136],"domain_scores_gemma":[0.98057437,0.003063152,0.0013188237,0.00060905237,0.011164663,0.0032700337],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0054875985,0.003751639,0.004532817,0.0071971836,0.002405908,0.013132434,0.0028620688,0.0070751123,0.19949365],"category_scores_gemma":[0.0128485095,0.0007127594,0.0021970472,0.006419283,0.0009603364,0.0049783755,0.0028844953,0.004989421,0.1100862],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028184717,0.000017830991,0.000040033276,0.0001561549,0.000005314136,0.00001537689,0.000005613585,0.00003155828,0.00005956573,0.00021394138,0.99103934,0.008386939],"study_design_scores_gemma":[0.000030386022,0.00003062817,0.0007659025,0.00048684535,0.000015629037,0.000033812557,0.000037259604,0.00016200106,0.00015202706,0.0010525688,0.99721587,0.000017081838],"about_ca_topic_score_codex":0.002538927,"about_ca_topic_score_gemma":0.0032369462,"teacher_disagreement_score":0.19949365,"about_ca_system_score_codex":0.0040657967,"about_ca_system_score_gemma":0.004380764,"threshold_uncertainty_score":0.6673727},"labels":[],"label_agreement":null},{"id":"W2097492217","doi":"10.1139/l2012-028","title":"Contractor default prediction model for surety bonding<sup>1</sup>This paper is one of a selection of papers in this Special Issue on Construction Engineering and Management.","year":2012,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Surety; Risk analysis (engineering); Selection (genetic algorithm); Construction contract; Project management; Computer science; Operations research; Engineering; Business; Contract management; Finance; Systems engineering; Artificial intelligence","score_opus":0.02089705431096136,"score_gpt":0.24013873609224579,"score_spread":0.21924168178128442,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097492217","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31010962,0.00039998424,0.6781209,0.000703578,0.00009271473,0.00029021292,0.00089344697,0.00094248226,0.008447072],"genre_scores_gemma":[0.9347874,0.00017967154,0.060550056,0.000059616785,0.000031065883,0.00020872717,0.0010714122,0.00002666202,0.0030853245],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990283,0.0002535819,0.00007470282,0.0002696157,0.00027793346,0.000095879346],"domain_scores_gemma":[0.997216,0.0015219116,0.0002804196,0.00012807972,0.0007761419,0.00007740045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030231017,0.00061951706,0.0007565723,0.0011495891,0.00050721865,0.0011607076,0.0014145956,0.0009834348,0.0027719343],"category_scores_gemma":[0.006178193,0.00031171436,0.00091499544,0.0007818837,0.00032431618,0.0011574974,0.0005659612,0.0010415214,0.00051786716],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019082882,0.00012584827,0.016018737,0.000065590844,0.00007155774,0.00019379123,0.00015964353,0.9101492,0.0007683342,0.005528025,0.0033813543,0.063347116],"study_design_scores_gemma":[0.0000023839466,0.000014527532,0.0010231026,0.0000045519146,0.000008261907,0.000012603635,0.000014258613,0.9975867,0.00011551851,0.0010464502,0.00016645505,0.0000051109387],"about_ca_topic_score_codex":0.020692816,"about_ca_topic_score_gemma":0.013427509,"teacher_disagreement_score":0.020692816,"about_ca_system_score_codex":0.0015325733,"about_ca_system_score_gemma":0.0012611389,"threshold_uncertainty_score":0.04114479},"labels":[],"label_agreement":null},{"id":"W2097739862","doi":"10.5539/mas.v7n1p67","title":"Relationship between Factors of Construction Resources Affecting Project Cost","year":2012,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":63,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universiti Tun Hussein Onn Malaysia","keywords":"Cost overrun; Cash flow; Business; Cronbach's alpha; Data collection; Economic shortage; Identification (biology); Operations management; Finance; Construction industry; Marketing; Economics; Statistics; Construction engineering; Engineering; Mathematics","score_opus":0.22292493271047617,"score_gpt":0.39622792488712294,"score_spread":0.17330299217664677,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097739862","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99437875,0.0003716244,0.0010121153,0.00011029106,0.0000053245526,0.00004850167,0.000105906074,0.0000072080093,0.003960302],"genre_scores_gemma":[0.9989594,0.00016555768,0.00041944018,0.0000049569326,0.0000034412644,0.0000135619275,0.00006293216,0.000002528308,0.00036805792],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9971687,0.0007898441,0.0003266956,0.00016135276,0.0011634253,0.00039005856],"domain_scores_gemma":[0.9779839,0.012819452,0.005049548,0.0003758336,0.0025849468,0.0011864272],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016177754,0.0003238768,0.00027215667,0.002374364,0.00039891238,0.0013679516,0.00032116973,0.00032393177,0.0032013645],"category_scores_gemma":[0.01285399,0.00019733529,0.0003931138,0.0020967068,0.0005307513,0.00063060963,0.00054726534,0.0004014129,0.00022593382],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000096559896,0.00017266785,0.96830475,0.00013587915,0.00012115552,0.00048837694,0.00076108455,0.0035466736,0.00056403276,0.0008517172,0.00033903294,0.024618136],"study_design_scores_gemma":[0.0000026749283,0.00012230958,0.99405056,0.000047790763,0.000039283503,0.00024213326,0.0016915883,0.0021493891,0.00024242577,0.0003538452,0.0010373674,0.000020631694],"about_ca_topic_score_codex":0.004546606,"about_ca_topic_score_gemma":0.005374551,"teacher_disagreement_score":0.004546606,"about_ca_system_score_codex":0.0009668275,"about_ca_system_score_gemma":0.0015101898,"threshold_uncertainty_score":0.010709643},"labels":[],"label_agreement":null},{"id":"W2097930904","doi":"10.1177/0037549712459772","title":"Assessing design process in engineering consultancy firms using lean principles","year":2012,"lang":"en","type":"article","venue":"SIMULATION","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Interconnectivity; Process (computing); Process management; Lean project management; Manufacturing engineering; Design process; Lean manufacturing; Computer science; Engineering design process; Process design; Systems engineering; Engineering; Business; Work in process; Operations management; Marketing","score_opus":0.35844477906523464,"score_gpt":0.4586743654526269,"score_spread":0.10022958638739227,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097930904","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95525044,0.00010407831,0.040849105,0.0001398138,0.0000024213036,0.00031018959,0.000068521804,0.00005161737,0.0032239298],"genre_scores_gemma":[0.9661206,0.00012587961,0.03304196,0.000024013894,0.0000010194643,0.00017062237,0.00015118394,0.000007551265,0.00035699498],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9888976,0.007715075,0.0004901169,0.00037591218,0.0020062402,0.00051491836],"domain_scores_gemma":[0.9708029,0.022877693,0.002413792,0.00096629246,0.0025502143,0.00038911254],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011594504,0.00067923125,0.00050641794,0.0028089923,0.0013533334,0.0034631703,0.0008233991,0.0011727957,0.0013845039],"category_scores_gemma":[0.025516082,0.00060446246,0.0005721044,0.0027905896,0.0010569441,0.002476559,0.0014695269,0.00079831557,0.00019407357],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014162108,0.0023789047,0.20493765,0.0010255646,0.000166427,0.0007724933,0.02290935,0.5669603,0.014666459,0.01871341,0.0005615315,0.16549177],"study_design_scores_gemma":[0.00037268625,0.0029146702,0.07840567,0.00057920744,0.00012804092,0.00033596394,0.034901246,0.8367313,0.02196076,0.01684432,0.006525633,0.00030047566],"about_ca_topic_score_codex":0.008980844,"about_ca_topic_score_gemma":0.011737369,"teacher_disagreement_score":0.011594504,"about_ca_system_score_codex":0.0071316147,"about_ca_system_score_gemma":0.0054509602,"threshold_uncertainty_score":0.061318338},"labels":[],"label_agreement":null},{"id":"W2098088157","doi":"10.1061/(asce)me.1943-5479.0000013","title":"Attitude-Based Negotiation Methodology for the Management of Construction Disputes","year":2010,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":60,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Negotiation; Conflict resolution; Management science; Computer science; Resolution (logic); Process management; Operations research; Knowledge management; Business; Engineering; Political science; Artificial intelligence","score_opus":0.09458566992212401,"score_gpt":0.37213844592013623,"score_spread":0.2775527759980122,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2098088157","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012918123,0.000051127186,0.99631137,0.00011526921,0.00002739247,0.00028429346,0.000013111778,0.000060620958,0.0018450242],"genre_scores_gemma":[0.044043686,0.00010855645,0.95366675,0.000054235723,0.000030391291,0.0010872192,0.00004102087,0.000027456952,0.00094070606],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98072666,0.014689071,0.0008696676,0.0007274943,0.0026729517,0.00031415586],"domain_scores_gemma":[0.987763,0.008916735,0.00086523657,0.0005736089,0.0015808139,0.00030058355],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016914127,0.0011708444,0.0011538058,0.0033335565,0.0022771822,0.0034947593,0.0033997146,0.0020305677,0.00647133],"category_scores_gemma":[0.024783814,0.0006683204,0.001552719,0.0030060946,0.0029920123,0.0050741863,0.0032183742,0.0024014474,0.0009466932],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010002518,0.00031697273,0.0010053131,0.0005259169,0.00013493055,0.000340494,0.0036305303,0.083380066,0.0032676954,0.7006913,0.0028910998,0.20371574],"study_design_scores_gemma":[0.00008372144,0.0002150455,0.0003303913,0.00018165847,0.00006256122,0.0002894054,0.0013237757,0.6760819,0.0017695074,0.30045894,0.019107163,0.00009589522],"about_ca_topic_score_codex":0.0011490778,"about_ca_topic_score_gemma":0.0016439031,"teacher_disagreement_score":0.016914127,"about_ca_system_score_codex":0.0021122089,"about_ca_system_score_gemma":0.003917232,"threshold_uncertainty_score":0.08945155},"labels":[],"label_agreement":null},{"id":"W2098315148","doi":"10.1139/l07-101","title":"Using structural equation modeling to analyze relationships among key causes of delay in construction","year":2008,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":92,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Chung Hua University; National Science Council","keywords":"Structural equation modeling; Schedule; Key (lock); Computer science; Work (physics); Construction industry; Industrial engineering; Operations research; Econometrics; Engineering; Mathematics; Construction engineering; Mechanical engineering","score_opus":0.1521550956306048,"score_gpt":0.3016314661665467,"score_spread":0.14947637053594187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2098315148","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62973523,0.0013342286,0.3531169,0.0028550671,0.00018660729,0.0013308506,0.0016592775,0.00028206222,0.009499734],"genre_scores_gemma":[0.89700896,0.00095803925,0.09862036,0.0001398784,0.00003215136,0.0009792271,0.0012892971,0.000022051183,0.0009499485],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9926167,0.0055118604,0.00035797077,0.0004300861,0.00079803675,0.0002853842],"domain_scores_gemma":[0.97374254,0.021976095,0.0021934698,0.00041720862,0.0014182123,0.00025249246],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009038058,0.0012800071,0.00081469305,0.0043319953,0.00080627645,0.0018019867,0.000947569,0.0010589069,0.0020764333],"category_scores_gemma":[0.025745958,0.0006131579,0.0016517423,0.005397664,0.0007564872,0.0023065556,0.0018516453,0.0021099788,0.0002078706],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029262216,0.0012611259,0.47257537,0.0014072566,0.0028581498,0.0007515639,0.0131838815,0.23996966,0.0016733243,0.12854853,0.0038405096,0.13363802],"study_design_scores_gemma":[0.00018437079,0.0011155986,0.06952101,0.0008550272,0.0010720434,0.00025574362,0.008470084,0.82459974,0.0012956063,0.0838977,0.008570298,0.00016281856],"about_ca_topic_score_codex":0.018392958,"about_ca_topic_score_gemma":0.026946917,"teacher_disagreement_score":0.018392958,"about_ca_system_score_codex":0.003329522,"about_ca_system_score_gemma":0.006081922,"threshold_uncertainty_score":0.047798395},"labels":[],"label_agreement":null},{"id":"W2099215784","doi":"","title":"E-PROCUREMENT IN THE ATLANTIC CANADIAN AEC INDUSTRY","year":2006,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Procurement; Variety (cybernetics); Presentation (obstetrics); Fragmentation (computing); Business; Housing industry; Engineering; Critical success factor; Engineering management; Process management; Marketing; Industrial organization; Computer science","score_opus":0.022503341082543097,"score_gpt":0.29444766371237796,"score_spread":0.27194432262983487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099215784","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8802802,0.0031648914,0.0008277107,0.009776716,0.00007812695,0.00011977964,0.00050638,0.00005552074,0.10519068],"genre_scores_gemma":[0.97199553,0.0025581438,0.0009751098,0.0006214683,0.000012015614,0.000020039022,0.00021406761,0.000010506123,0.023593048],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9974564,0.00021565713,0.00007714259,0.00013931574,0.0011473706,0.000964156],"domain_scores_gemma":[0.9961515,0.0004555043,0.00021914921,0.00007852703,0.0022055304,0.0008897477],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018403488,0.00015078622,0.00017631793,0.002442757,0.009021238,0.0031850864,0.000943159,0.00078373705,0.0080858935],"category_scores_gemma":[0.0041296203,0.00020864145,0.00018845267,0.0061507584,0.0018208893,0.00094026723,0.0013206583,0.0008956216,0.0005477413],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044908543,0.00066015817,0.3500159,0.00074179843,0.00004780774,0.004125851,0.05087204,0.0036602407,0.005652594,0.08454944,0.037318606,0.4619065],"study_design_scores_gemma":[0.00002134094,0.00016826339,0.621261,0.00032752854,0.000019359582,0.0006197271,0.11051967,0.0025157456,0.0010758176,0.0017761304,0.26157272,0.00012273206],"about_ca_topic_score_codex":0.98130023,"about_ca_topic_score_gemma":0.9946359,"teacher_disagreement_score":0.05729137,"about_ca_system_score_codex":0.05729137,"about_ca_system_score_gemma":0.073983915,"threshold_uncertainty_score":0.41567993},"labels":[],"label_agreement":null},{"id":"W2101282445","doi":"10.1061/9780784412329.038","title":"Exploring the Impact of WorkFace Planning on Labour Productivity Variance Mitigation on Industrial Construction Projects: A Mathematical Framework","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Natural Resources Canada; Natural Sciences and Engineering Research Council of Canada; Emissions Reduction Alberta; Canadian Natural Resources; University of Alberta","funders":"","keywords":"Productivity; Process (computing); Variance (accounting); Computer science; Business; Economics; Economic growth; Accounting","score_opus":0.5185756865609568,"score_gpt":0.48759154713338526,"score_spread":0.0309841394275715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2101282445","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08351313,0.00096708647,0.88711226,0.0020242056,0.000059620626,0.00017540732,0.00012068291,0.000085071595,0.025942547],"genre_scores_gemma":[0.86989903,0.0018866892,0.122340105,0.00013763832,0.00006384462,0.00034859095,0.000069275586,0.00005170433,0.0052030673],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980573,0.00101279,0.00006678794,0.00016629281,0.00035377784,0.00034312977],"domain_scores_gemma":[0.990395,0.007648943,0.0010599542,0.00016157985,0.00054877956,0.00018568628],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006202885,0.0011213565,0.0009100031,0.001936654,0.0008349749,0.0032582965,0.0017174949,0.0015085923,0.003515473],"category_scores_gemma":[0.01520287,0.0007033237,0.0016209987,0.0014632815,0.0030089985,0.0031996837,0.002109187,0.0017470066,0.00021710018],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018424163,0.00006987407,0.0010189773,0.00007781186,0.000024788498,0.000062546314,0.000069633395,0.87444794,0.00043231208,0.11734047,0.0002830613,0.0061541633],"study_design_scores_gemma":[0.0000087545695,0.00006164513,0.0005586192,0.000027885688,0.00002523937,0.000018751745,0.00009444291,0.9642752,0.0003132868,0.033976965,0.000620969,0.000018365077],"about_ca_topic_score_codex":0.01596259,"about_ca_topic_score_gemma":0.011973496,"teacher_disagreement_score":0.01596259,"about_ca_system_score_codex":0.0039135297,"about_ca_system_score_gemma":0.005357919,"threshold_uncertainty_score":0.03280443},"labels":[],"label_agreement":null},{"id":"W2101800079","doi":"10.3968/j.ccc.1923670020080404.009","title":"Analysis and Evaluation on the Risks of the Construction Project","year":2010,"lang":"en","type":"article","venue":"Cross-cultural communication","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Risk management; Analytic hierarchy process; Humanities; Risk analysis (engineering); Engineering; Operations research; Business; Management; Philosophy; Economics","score_opus":0.2097091113562735,"score_gpt":0.48614446155973084,"score_spread":0.27643535020345733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2101800079","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37039393,0.0031073412,0.4959323,0.0036647364,0.00017551515,0.0009806857,0.0003736472,0.00040499648,0.124966756],"genre_scores_gemma":[0.9157728,0.0015873023,0.0758079,0.000079826365,0.00004985146,0.00048164141,0.00017208344,0.000059446575,0.0059890826],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9676377,0.017584577,0.0015117023,0.0011174566,0.011410216,0.0007383894],"domain_scores_gemma":[0.96790653,0.016152872,0.0043420773,0.0018486386,0.009277945,0.0004718643],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.023066398,0.0010366776,0.0005907045,0.0072671524,0.0014312174,0.005430087,0.0009310477,0.0008664056,0.003171618],"category_scores_gemma":[0.03956614,0.00032784548,0.0009785845,0.0038526887,0.0026962995,0.0042005144,0.0027759033,0.0013391465,0.00042040003],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037873862,0.0002706004,0.055023704,0.0010027232,0.0002581842,0.00042601232,0.017827665,0.050231427,0.0049351347,0.4434524,0.0042243875,0.421969],"study_design_scores_gemma":[0.00008429453,0.0016687287,0.122818425,0.0025810404,0.0006115338,0.0012444992,0.044497054,0.29673466,0.020869417,0.4261805,0.08221195,0.00049793837],"about_ca_topic_score_codex":0.0025658756,"about_ca_topic_score_gemma":0.0021789041,"teacher_disagreement_score":0.023066398,"about_ca_system_score_codex":0.0045505916,"about_ca_system_score_gemma":0.0047362116,"threshold_uncertainty_score":0.12198824},"labels":[],"label_agreement":null},{"id":"W2102126059","doi":"10.3329/jme.v45i1.24385","title":"DEVELOPING GROUP LEADERSHIP AND COMMUNICATION SKILLS FOR MONITORING EVM IN PROJECT MANAGEMENT","year":2015,"lang":"en","type":"article","venue":"Journal of Mechanical Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Earned value management; Schedule; Scope (computer science); Project management; Work (physics); Project management triangle; Warning system; Project planning; Process management; Computer science; Senior management; Engineering management; Project charter; Operations management; Business; Engineering; Systems engineering; Telecommunications; Public relations; Political science","score_opus":0.21086086064087892,"score_gpt":0.3803848347948246,"score_spread":0.16952397415394568,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102126059","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54537606,0.0006772911,0.34382868,0.012400422,0.00090807275,0.0068750037,0.0002032598,0.0030024913,0.08672865],"genre_scores_gemma":[0.62337714,0.0004076159,0.35938594,0.0013637709,0.0001237503,0.002851411,0.00021748742,0.00014048179,0.012132404],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9901894,0.006088351,0.00030725703,0.0007551062,0.0019008387,0.0007590755],"domain_scores_gemma":[0.9687321,0.011727371,0.0027517318,0.0018870145,0.008744427,0.0061574145],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013253449,0.00063770125,0.0003278033,0.0015293653,0.0017128934,0.002260655,0.0013303935,0.000804716,0.0053781946],"category_scores_gemma":[0.029376853,0.0003495339,0.0003815121,0.00069308345,0.0006882528,0.0019456818,0.002638189,0.00208864,0.0024573514],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017162239,0.006458396,0.031188296,0.00066203537,0.000036149406,0.00044226705,0.026075864,0.0015979044,0.019541297,0.00457792,0.02736731,0.881881],"study_design_scores_gemma":[0.0012767304,0.019382572,0.31852248,0.004924932,0.00041058662,0.0040516043,0.1294537,0.077982865,0.07088153,0.042946573,0.32950264,0.000663816],"about_ca_topic_score_codex":0.001001605,"about_ca_topic_score_gemma":0.0019306919,"teacher_disagreement_score":0.013253449,"about_ca_system_score_codex":0.0012336804,"about_ca_system_score_gemma":0.006445485,"threshold_uncertainty_score":0.070091784},"labels":[],"label_agreement":null},{"id":"W2103250951","doi":"10.1108/17538371211268997","title":"Projectification: Midler's footprint in the project management field","year":2012,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Originality; Project management; Creativity; Project portfolio management; Work (physics); Field (mathematics); Sociology; Value (mathematics); Knowledge management; Management; Process management; Business; Political science; Computer science; Engineering; Economics","score_opus":0.13205969023675643,"score_gpt":0.4106381491475891,"score_spread":0.27857845891083266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2103250951","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046468496,0.11115008,0.09357772,0.13907199,0.0053805644,0.00014849415,0.00009755857,0.00041059908,0.6036945],"genre_scores_gemma":[0.76475686,0.039236,0.045172792,0.01584182,0.0020419308,0.0004199068,0.000083458086,0.000697071,0.13175015],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.992071,0.005362102,0.00021710685,0.00070204725,0.0012315164,0.0004162133],"domain_scores_gemma":[0.98880684,0.00885514,0.0004113087,0.0006013988,0.0008194618,0.00050591066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0068016374,0.00070483336,0.00044270753,0.0026123235,0.0065114005,0.01118527,0.0012366145,0.0033438413,0.004833248],"category_scores_gemma":[0.010396975,0.00044588392,0.00034385177,0.0020362157,0.029421277,0.017331464,0.0069162757,0.0067405095,0.00092663907],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022092927,0.000013968362,0.0002265444,0.00015868635,0.0000026895987,0.00023173324,0.058375217,0.00013890854,0.00010084612,0.8600585,0.02743054,0.05324029],"study_design_scores_gemma":[0.0000064822,0.000029922638,0.0003046119,0.0007055799,0.000003119893,0.00072951015,0.017821098,0.00028233748,0.0002852659,0.11206171,0.86775243,0.000017861099],"about_ca_topic_score_codex":0.0052633956,"about_ca_topic_score_gemma":0.005188699,"teacher_disagreement_score":0.01118527,"about_ca_system_score_codex":0.0068488354,"about_ca_system_score_gemma":0.004650232,"threshold_uncertainty_score":0.049692035},"labels":[],"label_agreement":null},{"id":"W2104629034","doi":"10.1002/pmj.20064","title":"Discriminating Contexts and Project Management Best Practices on Innovative and Noninnovative Projects","year":2008,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":42,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"Université du Québec à Montréal","keywords":"Project management; Best practice; Project management triangle; OPM3; Principal (computer security); Maturity (psychological); Extreme project management; Project management 2.0; Project charter; Project stakeholder; Program management; Process management; Knowledge management; Product (mathematics); New product development; Set (abstract data type); Project manager; Project portfolio management; Sample (material); Business; Engineering; Computer science; Marketing; Management; Systems engineering; Political science","score_opus":0.24616468065183497,"score_gpt":0.43286550517308736,"score_spread":0.1867008245212524,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2104629034","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99919397,0.00008310986,0.00023787371,0.000034632263,0.0000010158225,0.000008901911,0.000007259566,0.0000015552811,0.0004317186],"genre_scores_gemma":[0.9993851,0.00007478233,0.00044817227,0.000009730094,0.0000016425595,0.000015886524,0.000016672659,0.0000013865204,0.000046592253],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9775244,0.015617561,0.001791176,0.0009386036,0.0031275658,0.0010007146],"domain_scores_gemma":[0.9019219,0.06370566,0.0252755,0.0029845566,0.0033864607,0.0027258142],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0096186595,0.0002755183,0.0003628501,0.0029421246,0.001146278,0.0020069373,0.00042769706,0.00045961028,0.0006441833],"category_scores_gemma":[0.068235025,0.00028081192,0.00020562082,0.001930756,0.001782927,0.0014209996,0.004013786,0.00048151566,0.000106780084],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016236897,0.00031549824,0.90488386,0.0001605612,0.00007043532,0.00024563764,0.02609726,0.0004321584,0.0015712568,0.00070170395,0.000123189,0.06523612],"study_design_scores_gemma":[0.000017533182,0.00038248932,0.9458522,0.00016635466,0.00003709167,0.00050207356,0.048591208,0.000993828,0.0012509269,0.00079820544,0.0013640046,0.000044163666],"about_ca_topic_score_codex":0.0009920227,"about_ca_topic_score_gemma":0.0025341795,"teacher_disagreement_score":0.0096186595,"about_ca_system_score_codex":0.0010380177,"about_ca_system_score_gemma":0.0009315752,"threshold_uncertainty_score":0.05086893},"labels":[],"label_agreement":null},{"id":"W2104935068","doi":"10.1139/l10-090","title":"Design and construction coordination problems and planning for design–build project new users","year":2010,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Design–build; Integrated project delivery; Process (computing); Focus (optics); Work (physics); Computer science; Engineering design process; Process management; Project planning; Upstream (networking); Interview; Construction management; Project management; Engineering management; Systems engineering; Engineering; Civil engineering; Telecommunications","score_opus":0.0678459876281912,"score_gpt":0.2862148764980856,"score_spread":0.21836888886989436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2104935068","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37206307,0.001635094,0.50148153,0.015303242,0.00018398484,0.0018768182,0.00025452455,0.0003986453,0.10680299],"genre_scores_gemma":[0.8931388,0.00042434788,0.099673845,0.00019204675,0.000025936723,0.00079822,0.00016612923,0.000095178446,0.0054854476],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9660392,0.02221198,0.0017595999,0.0025545787,0.0049291346,0.0025056223],"domain_scores_gemma":[0.9598277,0.024439776,0.0061412826,0.0038561882,0.00337465,0.002360507],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.025278341,0.00078801427,0.0006231596,0.002508097,0.009828214,0.009205346,0.002428643,0.0024666428,0.009206912],"category_scores_gemma":[0.054613158,0.0013623779,0.0007110528,0.0032036463,0.0064084404,0.006005585,0.0053376355,0.0027459972,0.0007077027],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046207345,0.00061794627,0.039686806,0.00096166803,0.00017108145,0.002044346,0.088493906,0.09548527,0.0032180084,0.38578412,0.015741527,0.36733317],"study_design_scores_gemma":[0.0004722491,0.00090090185,0.06019246,0.00088699604,0.0001717217,0.0022246537,0.23082982,0.117494725,0.005845251,0.35909012,0.2214425,0.00044854527],"about_ca_topic_score_codex":0.024351643,"about_ca_topic_score_gemma":0.023652736,"teacher_disagreement_score":0.025278341,"about_ca_system_score_codex":0.012687692,"about_ca_system_score_gemma":0.022990668,"threshold_uncertainty_score":0.13368624},"labels":[],"label_agreement":null},{"id":"W2105356973","doi":"10.1139/cjce-2012-0531","title":"Factor analysis of the interface management (IM) problems for construction projects in Alberta","year":2013,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Innovative Targeting Solutions (Canada); University of Calgary","funders":"","keywords":"Interface (matter); Construction management; Bidding; Project management; Work (physics); Construction industry; Engineering; Computer science; Construction engineering; Engineering management; Operations management; Civil engineering; Business; Systems engineering; Marketing","score_opus":0.03235637690008133,"score_gpt":0.2693876773450538,"score_spread":0.23703130044497248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105356973","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9958401,0.000055835884,0.0010004753,0.00006350683,0.0000034420539,0.00013512549,0.00026806336,0.000013911539,0.0026195233],"genre_scores_gemma":[0.99557495,0.00007930794,0.002444441,0.000010955203,0.0000019179645,0.00012263999,0.0004177234,0.0000067897768,0.0013413273],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99701405,0.00047882594,0.0001716516,0.00021359044,0.0016981149,0.00042385477],"domain_scores_gemma":[0.99123186,0.0028307356,0.0008976301,0.00031138046,0.004121065,0.0006073298],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004055476,0.00050770986,0.00039400713,0.0042645778,0.0017444679,0.002060388,0.00072240154,0.00030455523,0.0015870285],"category_scores_gemma":[0.010228351,0.00035444042,0.0005104372,0.007799034,0.0013114635,0.00035538847,0.0012141474,0.0005008505,0.00014239817],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020010573,0.00016559253,0.889857,0.00014627418,0.00008867351,0.0003573551,0.021528542,0.0028759988,0.0021542856,0.0012974181,0.0014608912,0.0798678],"study_design_scores_gemma":[0.000005768451,0.000053130843,0.9760059,0.000031463554,0.000018441253,0.000044003267,0.019060796,0.0020794934,0.00024414167,0.00014708181,0.0022921346,0.000017665992],"about_ca_topic_score_codex":0.7150006,"about_ca_topic_score_gemma":0.78440154,"teacher_disagreement_score":0.28499937,"about_ca_system_score_codex":0.016584022,"about_ca_system_score_gemma":0.020717567,"threshold_uncertainty_score":0.57335556},"labels":[],"label_agreement":null},{"id":"W2106456038","doi":"10.5539/ibr.v7n11p153","title":"Probability of Default Estimation for Construction Firms","year":2014,"lang":"en","type":"article","venue":"International Business Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Solvency; Probability of default; Rank (graph theory); Identification (biology); Estimation; Scale (ratio); Business; Process (computing); Work (physics); Actuarial science; Econometrics; Credit risk; Computer science; Risk analysis (engineering); Economics; Finance; Mathematics; Engineering; Management; Market liquidity","score_opus":0.26165757501868253,"score_gpt":0.47919670117165064,"score_spread":0.2175391261529681,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106456038","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.528884,0.00079381437,0.46638328,0.0006288512,0.000031276875,0.00008109627,0.0006941875,0.00036213367,0.0021413714],"genre_scores_gemma":[0.9913673,0.00025385895,0.0067273467,0.000017350758,0.00003041716,0.000036549045,0.0005491415,0.000011351926,0.0010068247],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.998645,0.00066494243,0.00008624108,0.00029570502,0.00016911645,0.00013904733],"domain_scores_gemma":[0.980194,0.016670294,0.0013693388,0.0008038087,0.0006397069,0.00032277202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0054629934,0.00035893093,0.00075659796,0.001690297,0.00023816354,0.0013414787,0.0010608193,0.0010965143,0.0029628966],"category_scores_gemma":[0.023130849,0.00032204666,0.00062361645,0.001037478,0.0007263751,0.0015325579,0.0007224759,0.0010755633,0.00032111982],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004430138,0.00014078735,0.16301829,0.0001327646,0.00017300335,0.00038184223,0.00025458625,0.73112005,0.0009978231,0.035556633,0.0026392934,0.06514201],"study_design_scores_gemma":[0.0000067969577,0.000045527617,0.015489373,0.000015401814,0.000016773498,0.00010017036,0.000048144288,0.9747515,0.0002835375,0.008968807,0.00025944997,0.000014599372],"about_ca_topic_score_codex":0.0046097166,"about_ca_topic_score_gemma":0.0023696441,"teacher_disagreement_score":0.0054629934,"about_ca_system_score_codex":0.0007851817,"about_ca_system_score_gemma":0.00039019692,"threshold_uncertainty_score":0.028891385},"labels":[],"label_agreement":null},{"id":"W2106618240","doi":"10.5430/bmr.v2n2p85","title":"Discussion on the Cost Budget of Construction Enterprises","year":2013,"lang":"en","type":"article","venue":"Business and Management Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Urbanization; Business; Real estate; Budget constraint; Industrial organization; Economics; Finance; Microeconomics; Economic growth","score_opus":0.15091411211906613,"score_gpt":0.4103964063599304,"score_spread":0.2594822942408643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106618240","genre_codex":"empirical","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5220036,0.024568656,0.01609987,0.13283026,0.0012416615,0.0002295034,0.0014128721,0.000058078902,0.30155548],"genre_scores_gemma":[0.97600466,0.0064870063,0.0022697567,0.0017212108,0.0005765122,0.00010535345,0.00029107006,0.0000303238,0.012514129],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9960685,0.0015451475,0.00033597593,0.00027236616,0.001208844,0.00056918955],"domain_scores_gemma":[0.9908813,0.004692314,0.001171023,0.0002182544,0.0026536302,0.00038343362],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004320805,0.00027703342,0.0003248509,0.002941969,0.0016538611,0.004033039,0.0008091303,0.001319668,0.0057812193],"category_scores_gemma":[0.015750736,0.00015143085,0.0005227557,0.0026722397,0.0014927825,0.0038462197,0.0012973172,0.0012619195,0.00022430513],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026170554,0.00010129378,0.033679895,0.00069381285,0.00005973957,0.00073441945,0.011315786,0.005512873,0.0012010342,0.82562184,0.030955778,0.089861825],"study_design_scores_gemma":[0.000042599007,0.00021750692,0.24605408,0.0024117567,0.00014271922,0.0010204951,0.04764565,0.008725433,0.0034540095,0.14198835,0.5480615,0.00023605269],"about_ca_topic_score_codex":0.014542473,"about_ca_topic_score_gemma":0.008730561,"teacher_disagreement_score":0.014542473,"about_ca_system_score_codex":0.006629371,"about_ca_system_score_gemma":0.0037239492,"threshold_uncertainty_score":0.048099697},"labels":[],"label_agreement":null},{"id":"W2106623194","doi":"10.1061/(asce)co.1943-7862.0000637","title":"Assessing the Market Potential for Housing Construction Products in Mexico","year":2012,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; BP (Canada)","funders":"","keywords":"Profitability index; Business; Product (mathematics); Globalization; Work (physics); Supply chain; Market analysis; Industrial organization; Service (business); Process (computing); Marketing; Environmental economics; Engineering; Economics; Finance; Computer science","score_opus":0.036254737356960845,"score_gpt":0.3137930025157408,"score_spread":0.27753826515878,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106623194","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9966732,0.00011101453,0.00011354802,0.000026179234,6.0605856e-7,0.000012368896,0.00006728813,0.0000012610716,0.0029945637],"genre_scores_gemma":[0.9988444,0.00015787146,0.00039363574,0.000004154233,0.0000016148647,0.00001036734,0.000121273835,7.987385e-7,0.0004658212],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995858,0.00010142564,0.00002739946,0.000046896614,0.00016054885,0.000077931894],"domain_scores_gemma":[0.9978787,0.0010819494,0.00054406846,0.000023797953,0.00039799282,0.00007348343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018846715,0.00016181527,0.00013895852,0.0031116756,0.00065015844,0.0012965921,0.00026181038,0.00035157116,0.0025706526],"category_scores_gemma":[0.0029001806,0.00014362794,0.00021159321,0.0013807879,0.0004268157,0.001196668,0.00057331903,0.0001845488,0.00012791887],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047736775,0.00031477516,0.9359454,0.00029394214,0.000053652784,0.0014634023,0.0049817017,0.0019222434,0.008728271,0.0032270486,0.00047834392,0.04211388],"study_design_scores_gemma":[0.000009929915,0.00042901284,0.97306937,0.000049119182,0.0000501547,0.00022911691,0.017415574,0.0024916094,0.002447075,0.000337716,0.003455546,0.000015800852],"about_ca_topic_score_codex":0.011775157,"about_ca_topic_score_gemma":0.022872362,"teacher_disagreement_score":0.011775157,"about_ca_system_score_codex":0.0015413505,"about_ca_system_score_gemma":0.0006007868,"threshold_uncertainty_score":0.02341324},"labels":[],"label_agreement":null},{"id":"W2107304599","doi":"10.1061/9780784412329.045","title":"Interface Management Model for Mega Capital Projects","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Project management triangle; Interface (matter); Project management; Documentation; Computer science; Software project management; Extreme project management; Project charter; Project management 2.0; Process management; Project planning; Interface control document; Work breakdown structure; User interface; Engineering management; Systems engineering; Engineering; OPM3; User interface design; Software development; Software","score_opus":0.3189226385172213,"score_gpt":0.48871884660871684,"score_spread":0.16979620809149554,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107304599","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019968595,0.0001569298,0.94079584,0.0006707219,0.000049191764,0.00036217517,0.0002343565,0.0007702659,0.036991894],"genre_scores_gemma":[0.55426246,0.0005643833,0.41518593,0.00014381132,0.00006770872,0.001601211,0.00094878837,0.00012558386,0.027100004],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9971891,0.000861351,0.00034791906,0.00040694987,0.00088840304,0.00030633115],"domain_scores_gemma":[0.99829096,0.00060731854,0.0002578588,0.00018613247,0.0004948569,0.00016286154],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003457394,0.00063847663,0.00042325322,0.002044381,0.0011990704,0.0051625585,0.002801798,0.0018057748,0.00782475],"category_scores_gemma":[0.004216513,0.00039860257,0.0011848537,0.0020097701,0.0013393792,0.005755658,0.0023907947,0.0014658915,0.0015668283],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000114315044,0.00024070077,0.0030793557,0.00015670244,0.000037514947,0.00092459604,0.0020010194,0.16799824,0.0019407526,0.7389673,0.0057482095,0.07879143],"study_design_scores_gemma":[0.00004203264,0.000117410884,0.0008221069,0.00006404171,0.000039261988,0.00025323918,0.00067369314,0.8475837,0.0009524064,0.11593753,0.033477373,0.00003720013],"about_ca_topic_score_codex":0.0075940266,"about_ca_topic_score_gemma":0.0048489175,"teacher_disagreement_score":0.00782475,"about_ca_system_score_codex":0.00217661,"about_ca_system_score_gemma":0.002737136,"threshold_uncertainty_score":0.026176393},"labels":[],"label_agreement":null},{"id":"W2107343129","doi":"","title":"Project management assets and project management performance: Preliminary findings","year":2011,"lang":"en","type":"article","venue":"AUSpace (Athabasca University)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; Athabasca University","funders":"","keywords":"Project management triangle; OPM3; Project management; Program management; Business; Knowledge management; Project risk management; Project portfolio management; Project planning; Extreme project management; Project stakeholder; Project charter; Process management; Computer science; Engineering; Systems engineering","score_opus":0.08900373024510315,"score_gpt":0.29103966632340983,"score_spread":0.20203593607830667,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107343129","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98634523,0.00033850642,0.00029161686,0.0008495438,0.000015253365,0.00008491999,0.00028815703,0.000010637014,0.011775967],"genre_scores_gemma":[0.9976381,0.00021156562,0.00026244228,0.00007359587,0.000016863532,0.00007877963,0.00017414337,0.0000086339305,0.0015358867],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9888383,0.005997658,0.0006006986,0.00059780024,0.0028724791,0.0010930237],"domain_scores_gemma":[0.886995,0.065246314,0.018511599,0.0033720285,0.014543698,0.011331322],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020620612,0.0004666841,0.0005510088,0.003746305,0.0017678863,0.005359477,0.0014107232,0.0007494811,0.006194904],"category_scores_gemma":[0.062199097,0.00071281515,0.0005091548,0.0051880316,0.0021975832,0.0036639106,0.0040699793,0.0022901967,0.0013042773],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029185772,0.0011852805,0.93164843,0.00021670976,0.00012798564,0.00019883996,0.030626638,0.0004433638,0.00014088239,0.0016636184,0.0025086072,0.030947702],"study_design_scores_gemma":[0.000009472849,0.0003537209,0.94948155,0.00015911636,0.000029528848,0.00004648075,0.046488803,0.0004187387,0.00007435597,0.00039594338,0.0025238562,0.000018320898],"about_ca_topic_score_codex":0.008992505,"about_ca_topic_score_gemma":0.009499105,"teacher_disagreement_score":0.020620612,"about_ca_system_score_codex":0.0025295275,"about_ca_system_score_gemma":0.0035830392,"threshold_uncertainty_score":0.10905355},"labels":[],"label_agreement":null},{"id":"W2108102148","doi":"10.1061/(asce)1084-0680(2005)10:4(260)","title":"Assessing and Managing the Potential Environmental Risks of Construction Projects","year":2005,"lang":"en","type":"article","venue":"Practice Periodical on Structural Design and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Indemnity; Risk analysis (engineering); Liability; Plan (archaeology); Business; Risk management; Identification (biology); Environmental planning; Construction management; Action plan; Environmental impact assessment; Environmental resource management; Engineering; Civil engineering; Finance; Actuarial science","score_opus":0.1199910683185432,"score_gpt":0.39149075875310335,"score_spread":0.2714996904345601,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2108102148","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82778424,0.002239504,0.11791751,0.0039647734,0.000044707074,0.00055929914,0.00019208965,0.0001719142,0.04712603],"genre_scores_gemma":[0.96175134,0.0016902995,0.034501813,0.000037883972,0.000023441246,0.00009554961,0.00009938165,0.000009312277,0.0017910325],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9929872,0.003782581,0.00032159803,0.00020591049,0.0022281725,0.0004745863],"domain_scores_gemma":[0.9934018,0.003674365,0.0012803262,0.00022681427,0.0010665981,0.0003500958],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0077327345,0.000642058,0.00043680007,0.0024436193,0.0011733108,0.003812159,0.0008235521,0.0013789888,0.0012864824],"category_scores_gemma":[0.015027398,0.0003938528,0.00029570214,0.0014688359,0.0008516954,0.0025864583,0.0016545793,0.0007586606,0.0002610407],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025127197,0.00045063754,0.08770083,0.00039079567,0.00021660853,0.00076454924,0.0022546742,0.5470409,0.004911683,0.034837298,0.0038713668,0.3173093],"study_design_scores_gemma":[0.000113197246,0.0013995576,0.07813706,0.000520828,0.00025284025,0.0009937983,0.016125437,0.73509187,0.011586109,0.11585985,0.039652597,0.00026688297],"about_ca_topic_score_codex":0.005589262,"about_ca_topic_score_gemma":0.008716043,"teacher_disagreement_score":0.0077327345,"about_ca_system_score_codex":0.0018851254,"about_ca_system_score_gemma":0.0043997853,"threshold_uncertainty_score":0.040895104},"labels":[],"label_agreement":null},{"id":"W2108863745","doi":"10.1061/41109(373)106","title":"Validity of Industry Benchmarks and Metrics for Engineering Productivity","year":2010,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Productivity; Schedule; Scope (computer science); Computer science; Industrial engineering; Engineering; Economics","score_opus":0.09976343955730614,"score_gpt":0.358125673946225,"score_spread":0.25836223438891887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2108863745","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48909447,0.0135191325,0.30995592,0.007967775,0.0023902229,0.0023690294,0.007882514,0.0016511423,0.16516986],"genre_scores_gemma":[0.93473446,0.0010676616,0.054862283,0.0009758615,0.00031867262,0.0019069968,0.004186359,0.0003063207,0.0016414371],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.5780395,0.16457461,0.033095695,0.021154135,0.19887066,0.0042653447],"domain_scores_gemma":[0.22699414,0.5459126,0.06569894,0.060622364,0.098209344,0.0025625892],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.20695087,0.0013205577,0.0017121711,0.010836604,0.0017214237,0.0063741445,0.0041532135,0.0035163353,0.0018741211],"category_scores_gemma":[0.6639182,0.00055226486,0.0020302692,0.012091672,0.0044011367,0.006268907,0.0045298077,0.00263243,0.001088612],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0029855482,0.0013015867,0.51277775,0.0022003246,0.0020242906,0.00029346877,0.0024495411,0.043378316,0.001925894,0.081697926,0.013818432,0.33514693],"study_design_scores_gemma":[0.0005528696,0.004905989,0.5815975,0.004224087,0.0006869054,0.0009420665,0.0038527255,0.15079547,0.011145034,0.16391225,0.07687357,0.000511491],"about_ca_topic_score_codex":0.0042494833,"about_ca_topic_score_gemma":0.0021886087,"teacher_disagreement_score":0.20695087,"about_ca_system_score_codex":0.0065582446,"about_ca_system_score_gemma":0.0062318696,"threshold_uncertainty_score":0.9779708},"labels":[],"label_agreement":null},{"id":"W2108874427","doi":"10.5539/mas.v8n4p16","title":"Significant Factors Causing Time Overrun in Construction Projects of Peninsular Malaysia","year":2014,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universiti Tun Hussein Onn Malaysia","keywords":"Economic shortage; Business; Work (physics); Cash flow; Finance; Operations management; Questionnaire; Cash; Cost overrun; Construction industry; Accounting; Engineering; Construction engineering","score_opus":0.052742608294673456,"score_gpt":0.3030823215968527,"score_spread":0.25033971330217925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2108874427","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99896216,0.00020842685,0.00012314905,0.00010362785,0.0000056224067,0.000008745288,0.0000294046,0.0000035365986,0.000555301],"genre_scores_gemma":[0.99938846,0.00015798637,0.00012371932,0.000013002913,0.000005191415,0.000004839041,0.000033170363,0.0000026442226,0.00027089196],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9981817,0.00057244615,0.00023036987,0.00012823651,0.00043819807,0.0004490729],"domain_scores_gemma":[0.9919729,0.0011446717,0.004595691,0.00017795211,0.0007255646,0.001383247],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009469249,0.00029000707,0.00018108143,0.00115224,0.00075218786,0.0008791525,0.000342039,0.0003647519,0.002402324],"category_scores_gemma":[0.004946235,0.00023911096,0.00022204533,0.0011381572,0.0005039236,0.00044833717,0.00085930707,0.00049163983,0.00025065665],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010301618,0.00012382814,0.9766791,0.00007130654,0.000029808169,0.0011127972,0.0026977425,0.00059722515,0.0011216745,0.00013755973,0.0003567824,0.01696915],"study_design_scores_gemma":[0.0000016406163,0.00011880173,0.9887776,0.00003671234,0.000009655504,0.00046152374,0.008845463,0.00031834314,0.00021922785,0.00007578704,0.0011233648,0.000012010958],"about_ca_topic_score_codex":0.0060148975,"about_ca_topic_score_gemma":0.012947587,"teacher_disagreement_score":0.0060148975,"about_ca_system_score_codex":0.00077669474,"about_ca_system_score_gemma":0.0014267212,"threshold_uncertainty_score":0.011959732},"labels":[],"label_agreement":null},{"id":"W2109259380","doi":"10.1002/pmj.20213","title":"A Fresh Look at the Contribution of Project Management to Organizational Performance","year":2010,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":123,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"OPM3; Project management; Organizational performance; Knowledge management; Process management; Project management triangle; Organizational behavior management; Performance management; Empirical research; Set (abstract data type); Business; Management science; Computer science; Organizational behavior and human resources; Engineering; Systems engineering; Marketing","score_opus":0.03255945474189378,"score_gpt":0.33047225000849645,"score_spread":0.2979127952666027,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109259380","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21089101,0.12999368,0.10980456,0.22018105,0.002697676,0.00019392728,0.00022895064,0.00020913169,0.32579997],"genre_scores_gemma":[0.908446,0.05471418,0.019498482,0.0038999126,0.002247633,0.00010181469,0.00011303592,0.0001213397,0.010857551],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99363613,0.003944481,0.00020095575,0.00021792103,0.0014059437,0.00059458776],"domain_scores_gemma":[0.9769075,0.01801051,0.0013187419,0.0007255876,0.002103714,0.00093398365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0074549783,0.0009184172,0.0008259475,0.004101972,0.0028439565,0.01315501,0.0010264947,0.0020851416,0.0050471066],"category_scores_gemma":[0.022100158,0.00037149576,0.00056977506,0.0038321193,0.0072255596,0.012881015,0.00381127,0.005502483,0.0005919489],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015001609,0.00035669195,0.022864178,0.001888243,0.000102440135,0.001023816,0.027208613,0.0044315485,0.002311224,0.5840701,0.012785957,0.34280723],"study_design_scores_gemma":[0.000015882048,0.0011129663,0.058643,0.0033109556,0.00008360264,0.0017052004,0.07186186,0.005686127,0.002960159,0.61791414,0.23651604,0.00019006174],"about_ca_topic_score_codex":0.0015966106,"about_ca_topic_score_gemma":0.0019241908,"teacher_disagreement_score":0.01315501,"about_ca_system_score_codex":0.0025485803,"about_ca_system_score_gemma":0.0024001845,"threshold_uncertainty_score":0.039426148},"labels":[],"label_agreement":null},{"id":"W2110260054","doi":"10.5539/ijms.v5n1p34","title":"Analysis of Cement Market in Northern Nigeria","year":2013,"lang":"en","type":"article","venue":"International Journal of Marketing Studies","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cement; Business; Production (economics); Commerce; Marketing; Economics; Geography","score_opus":0.06514886343072956,"score_gpt":0.39367671683415667,"score_spread":0.3285278534034271,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110260054","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9921508,0.00027533813,0.00007451664,0.000082415965,0.000002908452,0.000011077337,0.0002967146,0.000002192479,0.007104013],"genre_scores_gemma":[0.99723476,0.00033179074,0.00010013696,0.000009789937,0.0000036493188,0.000007925449,0.00025557046,0.000001557209,0.0020548203],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99989367,0.000015526988,0.0000061243363,0.000012688986,0.000036103876,0.000035854355],"domain_scores_gemma":[0.99962795,0.00013596712,0.00011865712,0.000006497519,0.0000653866,0.000045458666],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014796157,0.00007976987,0.00012788191,0.002029508,0.0004724314,0.0010945465,0.00009224653,0.00020341767,0.0038689205],"category_scores_gemma":[0.00050040934,0.00008745078,0.0001117415,0.0020031112,0.0002617959,0.0006973469,0.0002837075,0.00016712587,0.00024581954],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004276648,0.0001856054,0.89691323,0.00046039224,0.00003497471,0.007834371,0.014515893,0.0021064195,0.01045192,0.01821452,0.003045354,0.04580964],"study_design_scores_gemma":[0.0000039523475,0.000048203623,0.95396334,0.000069641974,0.000010492949,0.00086868566,0.029370714,0.0028608649,0.00094356656,0.0007916491,0.011054438,0.000014587786],"about_ca_topic_score_codex":0.01390954,"about_ca_topic_score_gemma":0.025837151,"teacher_disagreement_score":0.01390954,"about_ca_system_score_codex":0.000926116,"about_ca_system_score_gemma":0.0005770722,"threshold_uncertainty_score":0.027657151},"labels":[],"label_agreement":null},{"id":"W2111480205","doi":"10.1139/l08-053","title":"Design–information technology and performances in building and industrial projects","year":2008,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Institute of Standards and Technology","keywords":"Rework; Scope (computer science); Schedule; Government (linguistics); Construction industry; Baseline (sea); Earned value management; Business; Engineering; Transport engineering; Project management; Operations management; Project planning; Construction engineering; Computer science; OPM3; Systems engineering","score_opus":0.06576134913697604,"score_gpt":0.25593755206076346,"score_spread":0.19017620292378742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2111480205","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98423094,0.00035192314,0.0022100625,0.00008766268,0.0000030887823,0.00002675438,0.00014005919,0.000016336839,0.012933269],"genre_scores_gemma":[0.99785715,0.000118407166,0.0009702579,0.0000056567224,0.0000034266004,0.000017625285,0.00018137603,0.0000069438875,0.0008391159],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9894442,0.0046551777,0.00082312914,0.00042795145,0.0038196994,0.0008297077],"domain_scores_gemma":[0.9759453,0.012804619,0.0061657014,0.0016164772,0.0023186002,0.0011493934],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0056594224,0.00030612078,0.0003060659,0.002885988,0.0007238698,0.0021085117,0.00038259834,0.0004334577,0.003408894],"category_scores_gemma":[0.022943622,0.0002053575,0.00034763536,0.0048170895,0.0014425609,0.0013225186,0.001965073,0.00040028297,0.000605241],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029010148,0.00037213726,0.85492796,0.0001743557,0.00011369208,0.0002365056,0.0019668273,0.020565705,0.0017310341,0.0043492406,0.0005249168,0.114747405],"study_design_scores_gemma":[0.000016990778,0.00065983296,0.978683,0.000051631127,0.000030687203,0.00035066015,0.0023981766,0.0044599427,0.002686029,0.002375919,0.008252464,0.00003466079],"about_ca_topic_score_codex":0.0032061234,"about_ca_topic_score_gemma":0.004267983,"teacher_disagreement_score":0.0056594224,"about_ca_system_score_codex":0.0021560981,"about_ca_system_score_gemma":0.0011625073,"threshold_uncertainty_score":0.029930234},"labels":[],"label_agreement":null},{"id":"W2111532474","doi":"10.1061/(asce)co.1943-7862.0000457","title":"Quantitative Method for Updating Cost Contingency throughout Project Execution","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Workers Compensation Board of Alberta; University of Alberta","funders":"","keywords":"Timeline; Cost contingency; Project management; Earned value management; Contingency; Computer science; Resource (disambiguation); Set (abstract data type); Project planning; Contingency plan; Operations research; Project management triangle; Risk analysis (engineering); Engineering; Systems engineering; Project charter; Business","score_opus":0.11854106557661641,"score_gpt":0.3959825683608168,"score_spread":0.2774415027842004,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2111532474","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019556081,0.000032456166,0.9965726,0.00002363124,0.000022984008,0.000036966943,0.0000870115,0.0005334438,0.0007352383],"genre_scores_gemma":[0.19101109,0.0001393045,0.8062842,0.000041278156,0.00006203893,0.00028282308,0.0004203475,0.00022364336,0.0015353218],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99703884,0.0007842406,0.00016538332,0.00045340945,0.0014678075,0.00009042109],"domain_scores_gemma":[0.9919744,0.0042076,0.0009957385,0.00083087006,0.0018360042,0.00015547728],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003142646,0.001058445,0.0007520359,0.0032587813,0.0004987393,0.0012588815,0.0013782844,0.00058050954,0.0034457634],"category_scores_gemma":[0.0139076095,0.0006289362,0.0005383067,0.0017341601,0.0005541687,0.0017255584,0.0007301401,0.0013613675,0.0007633043],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023957058,0.00012139815,0.004166242,0.0002556915,0.000114037466,0.000117113115,0.00026173235,0.45094624,0.010660752,0.02615563,0.003518836,0.5034428],"study_design_scores_gemma":[0.000027336508,0.00008787298,0.0012648707,0.000034587938,0.000028045744,0.00010396197,0.000040885625,0.97995764,0.0046541053,0.008866453,0.004872061,0.00006213859],"about_ca_topic_score_codex":0.004165259,"about_ca_topic_score_gemma":0.0030255113,"teacher_disagreement_score":0.004165259,"about_ca_system_score_codex":0.00087317545,"about_ca_system_score_gemma":0.0013104322,"threshold_uncertainty_score":0.01662004},"labels":[],"label_agreement":null},{"id":"W2112478686","doi":"10.1016/j.ijproman.2011.11.007","title":"Project portfolios in dynamic environments: Organizing for uncertainty","year":2011,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":232,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Project portfolio management; Dynamic capabilities; Portfolio; Project management; Context (archaeology); Computer science; Process management; Management science; Engineering management; Operations research; Risk analysis (engineering); Engineering; Systems engineering; Knowledge management; Business; Finance","score_opus":0.11789223166251851,"score_gpt":0.3942127273135563,"score_spread":0.2763204956510378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2112478686","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6753098,0.00091676053,0.29391325,0.0024647983,0.00007318919,0.00018872904,0.00012064981,0.00013561052,0.02687727],"genre_scores_gemma":[0.984639,0.00017452982,0.014049849,0.000033782497,0.00002650645,0.000046387013,0.000041488594,0.000021715025,0.0009667141],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9960348,0.0017505334,0.00020884263,0.00053235947,0.0006994502,0.0007740295],"domain_scores_gemma":[0.9847285,0.008327923,0.0027110549,0.0013407544,0.0015419895,0.0013496408],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0056615914,0.0003757347,0.00083754276,0.002257381,0.0017380907,0.008854311,0.0013680272,0.0016573273,0.0029399404],"category_scores_gemma":[0.029884418,0.0006132854,0.00042067183,0.0023476076,0.0022888551,0.008632331,0.003927878,0.0011166284,0.00045577055],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004980557,0.00041081273,0.09180346,0.00031068662,0.00029888,0.0010647753,0.007448576,0.271235,0.0030270566,0.29727295,0.0046784994,0.32195118],"study_design_scores_gemma":[0.000057659145,0.00025022976,0.03322828,0.00013466943,0.000087883316,0.00036145392,0.014398678,0.34015375,0.0010100526,0.6015902,0.008620829,0.000106341045],"about_ca_topic_score_codex":0.0019525663,"about_ca_topic_score_gemma":0.0035133862,"teacher_disagreement_score":0.008854311,"about_ca_system_score_codex":0.0017327229,"about_ca_system_score_gemma":0.001855263,"threshold_uncertainty_score":0.029941738},"labels":[],"label_agreement":null},{"id":"W2114468640","doi":"10.1002/pmj.20163","title":"Building Pragmatist Theories of PM Practice: Theorizing the Act of Project Management","year":2010,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Pragmatism; Perspective (graphical); Epistemology; Project management; Practice theory; Sociology; Management theory; Management science; Knowledge management; Engineering ethics; Computer science; Management; Engineering; Philosophy; Artificial intelligence; Economics","score_opus":0.04031850080084777,"score_gpt":0.3957192507512245,"score_spread":0.35540074995037674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2114468640","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.061159056,0.004171907,0.7599163,0.042414583,0.00029234844,0.00035842482,0.000050883562,0.00016609655,0.13147041],"genre_scores_gemma":[0.78956443,0.0032618656,0.20096163,0.0012834362,0.00024225407,0.00087888393,0.000060248574,0.000066884764,0.0036803535],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9841426,0.010971261,0.0005604659,0.001026778,0.0027890417,0.00050993933],"domain_scores_gemma":[0.9651653,0.026708068,0.002608991,0.003039155,0.0018197917,0.000658651],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01952245,0.0010990498,0.0006396625,0.0059470735,0.003236054,0.010988881,0.0034710288,0.005127203,0.0026461442],"category_scores_gemma":[0.035941627,0.0009766755,0.00075810053,0.0026650692,0.053067133,0.023480872,0.006605667,0.006103784,0.0006762001],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008286883,0.000044073488,0.0007033731,0.00014776608,0.000009024635,0.00007866906,0.020211378,0.0022757503,0.0001462005,0.9632405,0.00042617228,0.012708906],"study_design_scores_gemma":[0.000013929145,0.000030477515,0.00033399026,0.00025982238,0.000005037418,0.000087002474,0.0061517414,0.0043257712,0.00018377313,0.9767131,0.011878244,0.00001712068],"about_ca_topic_score_codex":0.0016644368,"about_ca_topic_score_gemma":0.001212593,"teacher_disagreement_score":0.01952245,"about_ca_system_score_codex":0.0051158983,"about_ca_system_score_gemma":0.005636163,"threshold_uncertainty_score":0.103245795},"labels":[],"label_agreement":null},{"id":"W2115095150","doi":"10.1002/pmj.21321","title":"A Relational Typology of Project Management Offices","year":2013,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":103,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Typology; Superordinate goals; Knowledge management; Business; Relational view; Process management; Space (punctuation); PMOS logic; Computer science; Psychology; Engineering; Sociology; Social psychology","score_opus":0.13018582861123978,"score_gpt":0.37150534965831916,"score_spread":0.24131952104707938,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2115095150","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44081327,0.002246857,0.21169946,0.0039240182,0.00025147517,0.001191246,0.0007699871,0.00025060336,0.33885312],"genre_scores_gemma":[0.96214956,0.0006022263,0.029443061,0.00016412542,0.000051818355,0.0006282747,0.0002762785,0.00004060196,0.006644024],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9917374,0.004377257,0.0006068792,0.0010351519,0.0015469089,0.0006963344],"domain_scores_gemma":[0.9940602,0.0026945712,0.0010350059,0.0011313921,0.0005957567,0.00048313045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003924037,0.00034604818,0.00029886034,0.0052758106,0.0033580782,0.006900119,0.0012302798,0.001020916,0.007153192],"category_scores_gemma":[0.009688792,0.00027553513,0.00044628984,0.0050177397,0.006461622,0.007613003,0.0042915707,0.00084359193,0.00061706855],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048979724,0.000071439616,0.024460284,0.00022448269,0.00002269581,0.0011303368,0.04512153,0.0018388166,0.001135197,0.8727552,0.0029695414,0.050221555],"study_design_scores_gemma":[0.00006003093,0.000156319,0.026055828,0.0006477012,0.000030177644,0.0059987376,0.20636426,0.009160711,0.0007121351,0.44481295,0.30591908,0.00008210077],"about_ca_topic_score_codex":0.0018876151,"about_ca_topic_score_gemma":0.001383651,"teacher_disagreement_score":0.007153192,"about_ca_system_score_codex":0.002312963,"about_ca_system_score_gemma":0.0014349909,"threshold_uncertainty_score":0.023929775},"labels":[],"label_agreement":null},{"id":"W2116195047","doi":"10.1139/l08-138","title":"Implementation of project change management best practice in different project environments","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Benchmarking; Best practice; Project management; Computer science; Change order; Project planning; Process management; Project management triangle; Variance (accounting); Software project management; Pre-construction services; Engineering management; Project charter; Engineering; Business; Systems engineering; Software","score_opus":0.057695442744882586,"score_gpt":0.338102882674283,"score_spread":0.2804074399294004,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116195047","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9766069,0.00021835924,0.0066774674,0.001016553,0.000018070921,0.00050471316,0.00008425575,0.00011481522,0.014758928],"genre_scores_gemma":[0.988699,0.00012336162,0.010117938,0.00006392456,0.0000046728464,0.00020973555,0.00009186536,0.00001862656,0.0006707576],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.96052194,0.023150055,0.0022294868,0.0021980167,0.009134542,0.002765952],"domain_scores_gemma":[0.9164449,0.03220362,0.015698891,0.0106371725,0.018717844,0.0062975874],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02283082,0.00026848615,0.00045883615,0.0033159903,0.0016782857,0.0043962146,0.001181825,0.0009887584,0.0012231987],"category_scores_gemma":[0.10135027,0.0004373617,0.0004145579,0.0029538795,0.0013136726,0.0027014075,0.0033759433,0.0010485147,0.00025892857],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052163977,0.0033681684,0.3381814,0.00058619457,0.00021088518,0.00032535006,0.035317473,0.0048073404,0.003916584,0.0048703603,0.002373275,0.60552126],"study_design_scores_gemma":[0.00018257558,0.0026251099,0.89874536,0.0006034106,0.00013418274,0.00035040223,0.0627032,0.00978706,0.003604248,0.004313979,0.01678772,0.00016281995],"about_ca_topic_score_codex":0.0048849466,"about_ca_topic_score_gemma":0.012779451,"teacher_disagreement_score":0.02283082,"about_ca_system_score_codex":0.004658589,"about_ca_system_score_gemma":0.0072019007,"threshold_uncertainty_score":0.12074232},"labels":[],"label_agreement":null},{"id":"W2116244288","doi":"10.1139/l02-046","title":"Estimating the cost of capital projects: an empirical study of accuracy levels for municipal government projects","year":2002,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cost estimate; Estimation; Work (physics); Capital cost; Key (lock); Government (linguistics); Capital (architecture); Transport engineering; Computer science; Econometrics; Operations research; Engineering; Economics; Systems engineering","score_opus":0.14953243906982663,"score_gpt":0.3491784328657287,"score_spread":0.19964599379590206,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116244288","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9972119,0.00009069348,0.0021317452,0.000058937025,0.0000012075159,0.000014469609,0.00008580743,0.000006876719,0.0003984636],"genre_scores_gemma":[0.99882084,0.00003545007,0.00093088206,0.0000050463163,0.0000021532592,0.000009282933,0.00013589,0.00000499872,0.000055432964],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.970147,0.013171418,0.0035993715,0.0019857362,0.01005202,0.0010444503],"domain_scores_gemma":[0.42648244,0.4662184,0.061797224,0.019520927,0.025009906,0.0009711451],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.030146435,0.00022929847,0.00042152268,0.0017527055,0.00049284264,0.001922932,0.0010677187,0.00068835646,0.0005350194],"category_scores_gemma":[0.3295942,0.00035753753,0.00045859322,0.003752496,0.0015255226,0.0029080608,0.0012617103,0.0012413977,0.00012583389],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021529107,0.00009600099,0.95561826,0.00008199803,0.00010596528,0.00011867344,0.004717396,0.013398468,0.0003595462,0.0008570742,0.00015704788,0.024274288],"study_design_scores_gemma":[0.000012847158,0.00043185244,0.96289873,0.000081178885,0.0000684751,0.0005158955,0.0047729937,0.027556296,0.0012286514,0.0010049621,0.0013746273,0.000053478394],"about_ca_topic_score_codex":0.013273476,"about_ca_topic_score_gemma":0.009080686,"teacher_disagreement_score":0.9867265,"about_ca_system_score_codex":0.002441795,"about_ca_system_score_gemma":0.001049448,"threshold_uncertainty_score":0.15943152},"labels":[],"label_agreement":null},{"id":"W2117842831","doi":"10.1139/l09-101","title":"Project success indicators focusing on residential projects: Are schedule performance index and cost performance index accurate measures in earned value?","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Earned value management; Schedule; Index (typography); Value (mathematics); Meaning (existential); Control (management); Operations research; Measure (data warehouse); Computer science; Cost estimate; Work (physics); Operations management; Project management; Engineering; Project planning; Systems engineering; Data mining; Artificial intelligence","score_opus":0.04405122157359106,"score_gpt":0.29104251483792826,"score_spread":0.2469912932643372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2117842831","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7477937,0.0053128907,0.13635729,0.004285168,0.0003554803,0.00021930152,0.002475745,0.0003004388,0.102899924],"genre_scores_gemma":[0.9821618,0.0013041808,0.014028997,0.000072405135,0.000092630464,0.00008557666,0.0005650543,0.000031898555,0.0016574531],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.995452,0.0011843055,0.00030768814,0.00027128175,0.0025212832,0.00026341237],"domain_scores_gemma":[0.98463506,0.0057451106,0.0039520487,0.0006468854,0.004452405,0.0005684547],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0043723593,0.00080560945,0.0008559174,0.0056966953,0.00037982367,0.00286389,0.00077684876,0.0006022941,0.0013852121],"category_scores_gemma":[0.027751949,0.00016537296,0.0003250622,0.0113216825,0.0014546758,0.0036530662,0.0012364491,0.0007712903,0.0004606294],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022820171,0.00023143223,0.48337385,0.0008132182,0.00018737967,0.00021477633,0.0019717275,0.015034363,0.0021643434,0.066293545,0.0077451067,0.42174205],"study_design_scores_gemma":[0.000030567535,0.00068519963,0.8543195,0.00065059325,0.00016692499,0.00050698005,0.0072708298,0.04443316,0.005900321,0.050209846,0.03556809,0.0002578697],"about_ca_topic_score_codex":0.0065176096,"about_ca_topic_score_gemma":0.007720692,"teacher_disagreement_score":0.0065176096,"about_ca_system_score_codex":0.0014811653,"about_ca_system_score_gemma":0.0015151326,"threshold_uncertainty_score":0.023123503},"labels":[],"label_agreement":null},{"id":"W2118279246","doi":"10.1139/l09-061","title":"Risk assessment of international construction projects using the analytic network process","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":121,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Analytic network process; Bidding; Process (computing); Reliability (semiconductor); Context (archaeology); Risk assessment; Risk management; Computer science; Risk analysis (engineering); Risk management tools; Decision support system; Decision maker; Project risk management; Contingency; Operations research; Engineering; Project management; Analytic hierarchy process; Data mining; Business; Systems engineering","score_opus":0.03657092481528906,"score_gpt":0.3227750104091537,"score_spread":0.2862040855938646,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2118279246","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033384852,0.00016512228,0.9634072,0.00016072708,0.00001403008,0.00016303723,0.000047706893,0.00010136651,0.0025560549],"genre_scores_gemma":[0.6139933,0.00062005664,0.3834966,0.000026465656,0.000035090132,0.00042180746,0.00014890588,0.000028125995,0.0012296382],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99418193,0.0038574943,0.00021761736,0.00030589328,0.0013241984,0.00011285071],"domain_scores_gemma":[0.99109787,0.007018344,0.0006883092,0.00024957952,0.00083925587,0.0001066095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0068618995,0.0011367346,0.0007074215,0.00391434,0.00089675817,0.0023229516,0.00084997265,0.0006274428,0.0015792925],"category_scores_gemma":[0.019980902,0.00029986326,0.0008126748,0.0025470052,0.00076597556,0.0027575071,0.0016065815,0.00075448543,0.00017159511],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001958522,0.00010429652,0.007411858,0.0002543358,0.00015338903,0.00031845126,0.0013287171,0.7564658,0.0019615828,0.063871704,0.0006158541,0.16731806],"study_design_scores_gemma":[0.000009675187,0.00006478758,0.00075914996,0.000038022023,0.000025249477,0.00005826888,0.0002158398,0.9621578,0.0008247122,0.034430422,0.0013954997,0.000020606512],"about_ca_topic_score_codex":0.0036668289,"about_ca_topic_score_gemma":0.0022532414,"teacher_disagreement_score":0.0068618995,"about_ca_system_score_codex":0.0012975032,"about_ca_system_score_gemma":0.0013248521,"threshold_uncertainty_score":0.036289632},"labels":[],"label_agreement":null},{"id":"W2120193275","doi":"10.18757/ejtir.2010.10.1.2864","title":"Cost Overruns in Large-scale Transportation Infrastructure Projects: Explanations and Their Theoretical Embeddedness","year":2010,"lang":"en","type":"article","venue":"European journal of transport and infrastructure research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":85,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Embeddedness; Politics; Misinformation; Agency (philosophy); Scale (ratio); Prospect theory; Economics; Economies of scale; Positive economics; Microeconomics; Sociology; Political science; Computer science; Social science; Computer security","score_opus":0.057784938309657634,"score_gpt":0.36779139785537157,"score_spread":0.31000645954571393,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2120193275","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77891576,0.0065802354,0.108580895,0.031985167,0.0001916378,0.00021417717,0.00018274298,0.00009194759,0.07325744],"genre_scores_gemma":[0.99563897,0.00092537806,0.0025170199,0.00012424684,0.000036322297,0.000060130627,0.000041494506,0.0000071630975,0.0006493043],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9972633,0.0012870533,0.00018510435,0.00027977736,0.00061418535,0.00037059886],"domain_scores_gemma":[0.9743198,0.019187717,0.004121683,0.00081443216,0.0011804462,0.00037602975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004317266,0.00076304685,0.00043602922,0.0038262825,0.0012473477,0.004692418,0.001790778,0.0032511158,0.005776685],"category_scores_gemma":[0.016909024,0.0005491909,0.001072946,0.0024400381,0.0074498253,0.007128762,0.0035422158,0.0021032507,0.00025831876],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006226825,0.0001543575,0.016074438,0.00028957962,0.000050966304,0.00046960803,0.005002156,0.010998061,0.000155858,0.94725084,0.0006263139,0.018865611],"study_design_scores_gemma":[0.000051680458,0.00005877127,0.015255744,0.0003468734,0.000058733393,0.0002589628,0.007965472,0.034760334,0.0003337766,0.93635786,0.004492927,0.000058840982],"about_ca_topic_score_codex":0.0020559505,"about_ca_topic_score_gemma":0.0017222171,"teacher_disagreement_score":0.005776685,"about_ca_system_score_codex":0.0033818346,"about_ca_system_score_gemma":0.0017762706,"threshold_uncertainty_score":0.024537027},"labels":[],"label_agreement":null},{"id":"W2120884028","doi":"10.1287/msom.1070.0163","title":"Project Performance and the Enabling Role of Information Technology: An Exploratory Study on the Role of Alignment","year":2007,"lang":"en","type":"article","venue":"Manufacturing & Service Operations Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":67,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Texas at Dallas; University of Calgary","keywords":"Productivity; Process management; Knowledge management; Enabling; Project management; Competence (human resources); Information technology; Core competency; Business; Project management triangle; Computer science; Marketing; Systems engineering; Engineering","score_opus":0.029606316612819934,"score_gpt":0.29176830617988603,"score_spread":0.2621619895670661,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2120884028","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9985447,0.00003120544,0.00037372462,0.00006783878,4.3725385e-7,0.000016391892,0.000011960219,0.000001077683,0.00095264654],"genre_scores_gemma":[0.9994273,0.000057741432,0.00037996596,0.000007973293,0.0000011892408,0.00002221876,0.00001530918,0.0000010688035,0.00008718073],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99289095,0.0054451344,0.0002562603,0.00020162175,0.0006237322,0.0005822329],"domain_scores_gemma":[0.9525407,0.033273418,0.007922296,0.0011994581,0.002436329,0.0026277197],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010186178,0.00028100528,0.00028043415,0.001128144,0.0010231838,0.0017912782,0.00043287777,0.00043692708,0.0010877738],"category_scores_gemma":[0.035932172,0.00027280513,0.00019181335,0.0016448927,0.0016377625,0.0025626046,0.0024838464,0.00088603573,0.00017247187],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004462088,0.0034053102,0.8967355,0.00015806287,0.0000830242,0.00040876836,0.038611036,0.0023261851,0.001557545,0.006968467,0.00033631423,0.04896364],"study_design_scores_gemma":[0.00006219363,0.0031218303,0.92061347,0.00015641561,0.0000694247,0.0004506742,0.05940597,0.0075974576,0.0023142993,0.0030434902,0.0031251635,0.000039584924],"about_ca_topic_score_codex":0.0012450046,"about_ca_topic_score_gemma":0.001557953,"teacher_disagreement_score":0.010186178,"about_ca_system_score_codex":0.0011027934,"about_ca_system_score_gemma":0.0020439385,"threshold_uncertainty_score":0.05387032},"labels":[],"label_agreement":null},{"id":"W2120981242","doi":"10.1061/ajrua6.0000819","title":"Framework Methodology for Risk-Based Decision Making for Transportation Agencies","year":2015,"lang":"en","type":"article","venue":"ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part A Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"ASTER","funders":"Colorado Department of Transportation","keywords":"Portfolio; Risk analysis (engineering); Computer science; Agency (philosophy); Risk management; Context (archaeology); Risk assessment; Management science; Operations research; Engineering; Business","score_opus":0.10197888996242513,"score_gpt":0.35801646711544266,"score_spread":0.25603757715301756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2120981242","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00037831202,0.00016599194,0.99161166,0.00051618286,0.00004088736,0.00023583777,0.0001560954,0.0001000039,0.006795153],"genre_scores_gemma":[0.025395988,0.00040346803,0.9706525,0.0001467293,0.00006173467,0.0014611941,0.00031789244,0.0000547643,0.0015057748],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9867981,0.008245504,0.000971708,0.00095346296,0.0024927803,0.00053838635],"domain_scores_gemma":[0.9874489,0.008576174,0.00076275057,0.00090886565,0.0019677833,0.000335556],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021888474,0.0028931485,0.0019322637,0.006347042,0.0025414894,0.0080027785,0.006469163,0.0036351595,0.013074324],"category_scores_gemma":[0.02470643,0.001308058,0.004610318,0.0051474706,0.0035162435,0.005126564,0.004514091,0.004749237,0.00238891],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009446722,0.00004088711,0.00017399598,0.0001830833,0.00006666866,0.00011594258,0.00034935513,0.07959173,0.00013513808,0.90209943,0.0018940739,0.01534028],"study_design_scores_gemma":[0.000038170085,0.000043685366,0.000096693584,0.00035049717,0.000045213947,0.00010090371,0.0003842608,0.20090336,0.00022092638,0.7639623,0.033814527,0.000039476607],"about_ca_topic_score_codex":0.0138030285,"about_ca_topic_score_gemma":0.012937596,"teacher_disagreement_score":0.021888474,"about_ca_system_score_codex":0.008008254,"about_ca_system_score_gemma":0.011601828,"threshold_uncertainty_score":0.11575872},"labels":[],"label_agreement":null},{"id":"W2121559656","doi":"10.1139/l2012-052","title":"Facilitating team decision-making through reimbursable contracting strategies<sup>1</sup>This paper is one of a selection of papers in this Special Issue on Construction Engineering and Management.","year":2012,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Teamwork; Skepticism; Risk management; Compensation (psychology); Risk analysis (engineering); Selection (genetic algorithm); Engineering; Knowledge management; Process management; Operations management; Business; Engineering management; Computer science; Economics; Management; Finance","score_opus":0.019195214075252685,"score_gpt":0.26591338759776756,"score_spread":0.24671817352251488,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2121559656","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08175498,0.0065471493,0.6411177,0.037286483,0.00241852,0.0013049188,0.00017591426,0.00094510755,0.22844915],"genre_scores_gemma":[0.5944629,0.0045270342,0.3858238,0.0014897997,0.0006713977,0.0010242583,0.00022477086,0.0001800923,0.011596034],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9842302,0.012090752,0.00057086773,0.0005303458,0.001855125,0.00072260824],"domain_scores_gemma":[0.96877855,0.023373524,0.0028442917,0.0015698911,0.0018793471,0.0015543344],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015015763,0.0007258723,0.00036216222,0.0013055389,0.0019466025,0.0051195137,0.0018216078,0.0015314907,0.013525869],"category_scores_gemma":[0.027226029,0.00038728703,0.0006456022,0.0021627964,0.0020880566,0.004648418,0.004604326,0.0013352864,0.0020678628],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011677593,0.0007086004,0.0048160753,0.0013370581,0.00011524464,0.00026347954,0.006291166,0.0146600725,0.002489917,0.26548636,0.04776264,0.6559527],"study_design_scores_gemma":[0.0002602943,0.00077524316,0.009656412,0.0020884648,0.00015712468,0.0005259624,0.012921751,0.09506717,0.008075732,0.23778038,0.63248813,0.00020319683],"about_ca_topic_score_codex":0.0014078665,"about_ca_topic_score_gemma":0.0025150916,"teacher_disagreement_score":0.015015763,"about_ca_system_score_codex":0.0021265026,"about_ca_system_score_gemma":0.0058418326,"threshold_uncertainty_score":0.079411924},"labels":[],"label_agreement":null},{"id":"W2121572227","doi":"10.5539/ibr.v8n3p173","title":"Is Teamwork Effective in the Work Place? An Analysis of Team Work Environment in the Banking Sector, Sultanate of Oman","year":2015,"lang":"en","type":"article","venue":"International Business Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Teamwork; Work (physics); Business; Accountability; Sample (material); Marketing; Public relations; Management; Political science; Engineering; Economics","score_opus":0.1751645279937371,"score_gpt":0.4394670548279626,"score_spread":0.2643025268342255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2121572227","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99955696,0.000049014987,0.000017674076,0.00003234926,9.0077845e-7,0.0000024903807,0.000009943556,2.1223113e-7,0.00033032638],"genre_scores_gemma":[0.9996935,0.00007887722,0.00005067571,0.000010825628,0.0000011122198,0.0000045514416,0.000019357716,3.802272e-7,0.00014075448],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99965155,0.00010984824,0.000024840469,0.000026520578,0.00006893651,0.00011845561],"domain_scores_gemma":[0.9995414,0.00013145727,0.00016731632,0.000016193031,0.00007407219,0.00006955691],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004916272,0.00015393301,0.00018887596,0.001016629,0.0014231136,0.0008795643,0.00017190937,0.00018423478,0.0009915971],"category_scores_gemma":[0.0008612358,0.00012947012,0.0001534968,0.001695611,0.0005005267,0.00033745723,0.000539402,0.00017377132,0.00010459752],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000068358095,0.00010817384,0.9438557,0.000071408045,0.000032657186,0.0007510207,0.030647852,0.00011675073,0.0011842819,0.00040125527,0.0002717906,0.022490738],"study_design_scores_gemma":[0.0000012586074,0.000029200986,0.96502745,0.000014916152,0.000006519916,0.00008934453,0.03409019,0.00010193147,0.00007052471,0.00004015021,0.0005265532,0.0000019273405],"about_ca_topic_score_codex":0.015104005,"about_ca_topic_score_gemma":0.045493692,"teacher_disagreement_score":0.015104005,"about_ca_system_score_codex":0.0009898858,"about_ca_system_score_gemma":0.0009988843,"threshold_uncertainty_score":0.030032158},"labels":[],"label_agreement":null},{"id":"W2121794170","doi":"10.1002/pmj.21291","title":"Contextualized Project Management Practice: A Cluster Analysis of Practices and Best Practices","year":2012,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":94,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Archetype; Maturity (psychological); Competence (human resources); Knowledge management; Best practice; Capability Maturity Model; Perspective (graphical); Sample (material); Empirical research; Data science; Sociology; Computer science; Psychology; Epistemology; Management; Social psychology; Artificial intelligence","score_opus":0.21479830214743792,"score_gpt":0.4855235756169657,"score_spread":0.2707252734695278,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2121794170","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9810972,0.00015071985,0.014322454,0.0001445436,0.0000056448916,0.00032891965,0.00036150398,0.000038052818,0.0035509574],"genre_scores_gemma":[0.9870455,0.00006827016,0.012018248,0.000009948764,0.0000022044794,0.00020601907,0.00039204347,0.000014948216,0.0002427225],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9949344,0.002073172,0.00047040882,0.0008053366,0.001347341,0.00036932444],"domain_scores_gemma":[0.9900253,0.0047676433,0.0012403317,0.0015286509,0.0020674835,0.00037062354],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004371056,0.00026531122,0.00048457464,0.0065835943,0.0011887742,0.0027701566,0.00069478207,0.00039094567,0.0011572923],"category_scores_gemma":[0.015499128,0.00021349108,0.0004665907,0.00889028,0.001773297,0.0014444519,0.00273297,0.00039322436,0.00012323572],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00055637135,0.00027262524,0.50988877,0.00074187905,0.00054870965,0.0006112117,0.23159409,0.004747446,0.0071558245,0.025838066,0.0016383836,0.21640664],"study_design_scores_gemma":[0.00005292813,0.00033633903,0.6995343,0.00035683694,0.00021332725,0.00068535557,0.23707858,0.024307655,0.002405695,0.020689653,0.014165013,0.00017433694],"about_ca_topic_score_codex":0.010030252,"about_ca_topic_score_gemma":0.008632745,"teacher_disagreement_score":0.010030252,"about_ca_system_score_codex":0.0020530722,"about_ca_system_score_gemma":0.0022897,"threshold_uncertainty_score":0.023116648},"labels":[],"label_agreement":null},{"id":"W2121985148","doi":"10.1109/17.820728","title":"Assessing and controlling the quality of a project end product: the earned quality method","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Engineering Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":49,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa; Université du Québec en Outaouais","funders":"","keywords":"Quality (philosophy); Product (mathematics); Process management; Quality policy; Rework; Project manager; Project management triangle; Software quality control; Quality management; Project management; Business; Risk analysis (engineering); Operations management; Engineering; Computer science; Marketing; Systems engineering; Service (business); Software quality","score_opus":0.1275026008616013,"score_gpt":0.42298943267841776,"score_spread":0.29548683181681645,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2121985148","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016135508,0.0014613692,0.97233146,0.0004282446,0.000100171645,0.00032869162,0.00011289022,0.00039442297,0.008707156],"genre_scores_gemma":[0.300741,0.0011918966,0.69337696,0.0002278609,0.00008911026,0.0006683764,0.00016143186,0.0001239636,0.003419459],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.96516144,0.013879004,0.0020293624,0.003662845,0.014655103,0.00061227515],"domain_scores_gemma":[0.9623457,0.017156214,0.0055433717,0.0046413485,0.0096234195,0.00068989466],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019514052,0.0009591166,0.0010333257,0.004808669,0.000895366,0.005200494,0.0025144182,0.0011849186,0.0015029731],"category_scores_gemma":[0.043514762,0.00051220687,0.000917782,0.0020697282,0.0039610453,0.005497296,0.0040646424,0.0014524575,0.00044005262],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032328637,0.00020036701,0.021083593,0.0008864744,0.00015320943,0.00013303984,0.0018781809,0.021041462,0.0072153513,0.10681987,0.0023414902,0.83792365],"study_design_scores_gemma":[0.00052493706,0.0046887947,0.057685047,0.0026331935,0.0005975759,0.0025631096,0.003770773,0.39637205,0.06848774,0.30187777,0.15957993,0.001219063],"about_ca_topic_score_codex":0.0026145705,"about_ca_topic_score_gemma":0.0018258778,"teacher_disagreement_score":0.019514052,"about_ca_system_score_codex":0.0027328013,"about_ca_system_score_gemma":0.0045237266,"threshold_uncertainty_score":0.10320139},"labels":[],"label_agreement":null},{"id":"W2122091773","doi":"10.1002/pmj.21355","title":"Project Leadership Influences Resistance to Change: The Case of the Canadian Public Service","year":2013,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":63,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec en Outaouais","funders":"","keywords":"Resistance (ecology); Competence (human resources); Leadership style; Public relations; Context (archaeology); Change management (ITSM); Business; Transformational leadership; Knowledge management; Political science; Management; Marketing; Computer science; Economics","score_opus":0.3087064377671496,"score_gpt":0.3761620013674064,"score_spread":0.06745556360025678,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122091773","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9553416,0.00040719562,0.0006365618,0.0068738777,0.000046182577,0.00011654629,0.00003257293,0.000016741573,0.036528654],"genre_scores_gemma":[0.9955409,0.00037302225,0.00033122182,0.00035723497,0.000009981012,0.00002092508,0.000017975712,0.000010450818,0.0033383013],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.98791677,0.0049013468,0.00013007708,0.00045493638,0.0019918596,0.0046049925],"domain_scores_gemma":[0.9860432,0.0044731465,0.001382874,0.00035692466,0.0031899707,0.004553878],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0070471326,0.00044951402,0.0004070501,0.0019660625,0.025232524,0.0052504796,0.0022862593,0.0021444436,0.0039144536],"category_scores_gemma":[0.019384556,0.00033116873,0.0004753631,0.0021635331,0.009019798,0.0015394181,0.004062153,0.003291329,0.0002934979],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036170438,0.0010070666,0.14913136,0.00027000238,0.00009283571,0.013339186,0.69948095,0.0015928121,0.0018499979,0.034485947,0.012704081,0.08568407],"study_design_scores_gemma":[0.000074808304,0.00027494953,0.18816979,0.00023111665,0.000070645954,0.0013108941,0.7413695,0.0020986372,0.00055211235,0.0031956616,0.06252309,0.00012883589],"about_ca_topic_score_codex":0.9289152,"about_ca_topic_score_gemma":0.9562794,"teacher_disagreement_score":0.94388133,"about_ca_system_score_codex":0.056118682,"about_ca_system_score_gemma":0.060229994,"threshold_uncertainty_score":0.40717143},"labels":[],"label_agreement":null},{"id":"W2122385593","doi":"10.37265/japiv.v5i1.82","title":"Organizational Implementation of Best Value Project Delivery: Impact of Value-Based Procurement, Preplanning, and Risk Management","year":2013,"lang":"en","type":"article","venue":"Journal for the Advancement of Performance Information and Value","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Integrated project delivery; Documentation; Vendor; Business; Procurement; Process management; Project management triangle; Project management; Operations management; Knowledge management; Computer science; Marketing; Engineering","score_opus":0.04330416641878613,"score_gpt":0.37601918445835686,"score_spread":0.3327150180395707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122385593","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9934483,0.00016153682,0.00043932546,0.00046819213,0.0000068630598,0.000076448305,0.000009238612,0.00001078875,0.0053792153],"genre_scores_gemma":[0.9986181,0.00008107309,0.0006584414,0.00005587813,0.000002994204,0.00002104502,0.000016900798,0.0000029836403,0.00054261484],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98569924,0.00762557,0.00034176753,0.00033567424,0.003446735,0.0025509452],"domain_scores_gemma":[0.96504784,0.016726162,0.0056421226,0.0013013112,0.005883464,0.0053990036],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010182179,0.0002911876,0.0002564007,0.0009836461,0.0019461393,0.0046962923,0.0012303799,0.0008918386,0.001245393],"category_scores_gemma":[0.026475336,0.00030270836,0.00026895094,0.0009002995,0.0015636218,0.001123542,0.0018506849,0.0011969985,0.00015385979],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014905264,0.010985656,0.5817777,0.0006224648,0.00032855076,0.0010165632,0.035188828,0.011201946,0.0069781225,0.00885406,0.0019056969,0.33964992],"study_design_scores_gemma":[0.00012337793,0.005152908,0.9115027,0.00026965674,0.00017164634,0.0001549903,0.061349068,0.008659307,0.003489215,0.0013104154,0.007732488,0.00008418965],"about_ca_topic_score_codex":0.079191126,"about_ca_topic_score_gemma":0.1427347,"teacher_disagreement_score":0.079191126,"about_ca_system_score_codex":0.014085746,"about_ca_system_score_gemma":0.022382446,"threshold_uncertainty_score":0.15746033},"labels":[],"label_agreement":null},{"id":"W2124967623","doi":"10.12927/hcq..18650","title":"Best Practices in Project Management: Lessons Learned in Hospital Construction","year":2007,"lang":"en","type":"article","venue":"Healthcare Quarterly","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Credit Valley Hospital","funders":"","keywords":"Best practice; Product (mathematics); Operations management; Quality (philosophy); Point (geometry); Representation (politics); Business; Project management; Engineering; Management; Economics; Political science","score_opus":0.18741413498977338,"score_gpt":0.4706689803264151,"score_spread":0.2832548453366417,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124967623","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10679009,0.091067374,0.1083453,0.6122763,0.0031276485,0.0008571743,0.00016681243,0.00048296567,0.07688635],"genre_scores_gemma":[0.6611849,0.08796002,0.22262613,0.015971284,0.0012185702,0.0008007637,0.00019505306,0.00024364593,0.00979959],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9543482,0.03244113,0.002192261,0.0014506171,0.007254224,0.002313574],"domain_scores_gemma":[0.92124414,0.04915448,0.0034030408,0.0037338806,0.013340767,0.009123675],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.059125427,0.0011383899,0.0008341264,0.003539973,0.0055670287,0.013512742,0.0059127505,0.0060710707,0.0024116933],"category_scores_gemma":[0.0689005,0.0009676228,0.000726239,0.005314489,0.011520137,0.010834101,0.006337555,0.00885912,0.0008856753],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000115238974,0.0015036328,0.010870601,0.0030410388,0.00010696752,0.0011978702,0.056688104,0.00930833,0.00033062714,0.072338186,0.06371228,0.78078717],"study_design_scores_gemma":[0.00028747163,0.0010040303,0.027538585,0.016850702,0.00011123215,0.0018136627,0.22828203,0.009811369,0.0014310434,0.330644,0.38178015,0.00044562286],"about_ca_topic_score_codex":0.023115484,"about_ca_topic_score_gemma":0.045827813,"teacher_disagreement_score":0.059125427,"about_ca_system_score_codex":0.012979876,"about_ca_system_score_gemma":0.027790932,"threshold_uncertainty_score":0.3126889},"labels":[],"label_agreement":null},{"id":"W2125530092","doi":"10.1504/ijpd.2008.019239","title":"Good theory: developing a foundation for project management","year":2008,"lang":"en","type":"article","venue":"International Journal of Product Development","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"Athabasca University","keywords":"Foundation (evidence); Project management; Developing country; Management theory; Extreme project management; Frame (networking); Project management triangle; Engineering; Project charter; Program management; Engineering management; Management science; Engineering ethics; Knowledge management; OPM3; Computer science; Political science; Systems engineering; Economics; Economic growth","score_opus":0.1542383511128897,"score_gpt":0.4049594250014155,"score_spread":0.2507210738885258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2125530092","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0047258018,0.0042222,0.84464025,0.049998872,0.00090324343,0.0006119638,0.00017181315,0.00042240968,0.094303414],"genre_scores_gemma":[0.21724129,0.0075645046,0.75882596,0.004579748,0.0011163184,0.0026525625,0.00031418982,0.00035053786,0.0073548346],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97414464,0.016847944,0.0015381781,0.0016683385,0.0048302864,0.0009704859],"domain_scores_gemma":[0.937823,0.042066775,0.0033115244,0.00739454,0.0067694914,0.0026346087],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.040131822,0.0017140132,0.002089482,0.009055731,0.0062234327,0.01480957,0.005009172,0.006053696,0.010534423],"category_scores_gemma":[0.058471184,0.0016270586,0.0016744321,0.006016004,0.033079434,0.021978876,0.0076019475,0.010430124,0.003452859],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000060756483,0.00003590608,0.0002491155,0.00017522831,0.000012960801,0.00003256307,0.0008075514,0.0013403016,0.000041589068,0.97844154,0.003579408,0.015277784],"study_design_scores_gemma":[0.000015369415,0.000022267792,0.000113368085,0.0002803552,0.0000051014154,0.000021905635,0.0004607332,0.002560106,0.000073002484,0.97430885,0.022125991,0.000012877988],"about_ca_topic_score_codex":0.0034571488,"about_ca_topic_score_gemma":0.0028593566,"teacher_disagreement_score":0.040131822,"about_ca_system_score_codex":0.009306201,"about_ca_system_score_gemma":0.013661956,"threshold_uncertainty_score":0.21223992},"labels":[],"label_agreement":null},{"id":"W2125592804","doi":"10.1139/cjce-2014-0213","title":"Career paths of tradespeople in the construction industry","year":2014,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","keywords":"Economic shortage; Affect (linguistics); Career development; Test (biology); Stage (stratigraphy); Construction industry; Operations management; Business; Pipeline (software); Labour economics; Marketing; Management; Demographic economics; Engineering; Economics; Sociology; Psychology; Social psychology","score_opus":0.04030844689031035,"score_gpt":0.2553003859471172,"score_spread":0.21499193905680683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2125592804","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9988084,0.000027731774,0.000031868098,0.0000533328,0.0000012809365,0.0000035408493,0.000035819096,8.081948e-7,0.0010373311],"genre_scores_gemma":[0.9962196,0.000085343636,0.00011391643,0.000027386943,9.949821e-7,0.0000050085764,0.00010252025,0.0000011713249,0.0034442148],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9997882,0.000031599244,0.0000055793166,0.00002091712,0.00004047715,0.00011314409],"domain_scores_gemma":[0.9990252,0.00012922822,0.00013142824,0.000019667954,0.00017137518,0.0005230106],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052761973,0.00011495902,0.000066104636,0.0010690327,0.0017986849,0.00084523455,0.00035996528,0.000252617,0.00542221],"category_scores_gemma":[0.0012599096,0.00011371329,0.00013501258,0.0006638489,0.00035111027,0.00032946662,0.0007118603,0.00040699478,0.0006001047],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000896538,0.00011304739,0.9640849,0.000010952713,0.0000038106477,0.00034025777,0.013541949,0.00011338653,0.00054611464,0.0003234203,0.00055354147,0.020279013],"study_design_scores_gemma":[0.0000051060806,0.000110725814,0.9459798,0.000022248294,0.000003332005,0.00022651572,0.05044152,0.0003148869,0.00013295845,0.0001938804,0.0025596963,0.000009439748],"about_ca_topic_score_codex":0.14081386,"about_ca_topic_score_gemma":0.39598265,"teacher_disagreement_score":0.8591862,"about_ca_system_score_codex":0.0013559582,"about_ca_system_score_gemma":0.002364362,"threshold_uncertainty_score":0.27998847},"labels":[],"label_agreement":null},{"id":"W2125947703","doi":"10.5539/mas.v2n5p27","title":"The Malaysian Construction Industry’s Risk Management in Design and Build","year":2008,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Procurement; Workmanship; Risk management; Call for bids; Quality (philosophy); Risk analysis (engineering); Business; Documentation; Project risk management; Operations management; Project management; Engineering management; Computer science; Engineering; Project management triangle; Marketing; Finance","score_opus":0.06561950076006481,"score_gpt":0.31304217446232196,"score_spread":0.24742267370225715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2125947703","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6581879,0.06514491,0.028610524,0.041752152,0.0003683895,0.0005430961,0.000169192,0.00012864944,0.20509514],"genre_scores_gemma":[0.96885675,0.0128286015,0.0058854227,0.0008513495,0.000060263552,0.00006767748,0.00004018256,0.000016803173,0.01139295],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9872519,0.005021626,0.0008926109,0.00061688933,0.0053818333,0.0008352214],"domain_scores_gemma":[0.9874166,0.004563662,0.0036726652,0.0004799883,0.0027379442,0.0011291285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008452818,0.00039326467,0.00020481503,0.0020500508,0.0025625643,0.0070558335,0.00091323094,0.001375084,0.0016468475],"category_scores_gemma":[0.010627624,0.0005032825,0.00027091766,0.0024042479,0.003002724,0.0036825724,0.0028272509,0.0016078111,0.0004328852],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001639199,0.00042696865,0.11819887,0.0036773777,0.00013191588,0.0033015884,0.146942,0.008252106,0.0043207295,0.08945484,0.018764053,0.6063657],"study_design_scores_gemma":[0.000030760224,0.0006505685,0.18286477,0.0059157517,0.000092265225,0.005878056,0.17186444,0.00747436,0.004111012,0.04465497,0.5761815,0.0002816313],"about_ca_topic_score_codex":0.0068192477,"about_ca_topic_score_gemma":0.009835464,"teacher_disagreement_score":0.008452818,"about_ca_system_score_codex":0.007877169,"about_ca_system_score_gemma":0.012627469,"threshold_uncertainty_score":0.057153165},"labels":[],"label_agreement":null},{"id":"W2126919697","doi":"10.1016/j.tranpol.2012.04.001","title":"Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases","year":2012,"lang":"en","type":"article","venue":"Transport Policy","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Cost overrun; Constructability; Cost estimate; Cost contingency; Engineering; Cost engineering; Process (computing); Total cost; Transport engineering; Risk analysis (engineering); Operations management; Construction engineering; Business; Construction industry; Computer science; Accounting","score_opus":0.04977872827895497,"score_gpt":0.36825599335812464,"score_spread":0.3184772650791697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2126919697","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9969632,0.0001288189,0.00042840015,0.00008794745,0.000002702851,0.000011862572,0.00023408834,0.0000051575444,0.0021377897],"genre_scores_gemma":[0.99930584,0.00002817459,0.00009578351,0.000006098362,0.0000026813364,0.000007476253,0.00021284574,0.0000058290175,0.0003352192],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9963785,0.00096690026,0.0005123018,0.00032790782,0.0008597205,0.0009547264],"domain_scores_gemma":[0.94899243,0.028471712,0.01472048,0.0014749201,0.004369211,0.001971196],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0053635556,0.00015567834,0.00037365418,0.0019782325,0.00041567226,0.0016256695,0.0006885254,0.00070846325,0.002974874],"category_scores_gemma":[0.03786879,0.0003455876,0.00049721065,0.002900589,0.00050929387,0.0012141383,0.00064370676,0.00070758973,0.00023634551],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012435005,0.00016993645,0.93688846,0.00008153158,0.00012992875,0.0004015983,0.00088306644,0.030086666,0.0020094493,0.00557129,0.00063623424,0.02189828],"study_design_scores_gemma":[0.0000059668178,0.0000852256,0.9906438,0.000013230466,0.000015184334,0.00014188947,0.00076018873,0.0062951217,0.00025765912,0.0010689485,0.0006955543,0.00001724198],"about_ca_topic_score_codex":0.01564011,"about_ca_topic_score_gemma":0.022613166,"teacher_disagreement_score":0.01564011,"about_ca_system_score_codex":0.0029403067,"about_ca_system_score_gemma":0.0015345556,"threshold_uncertainty_score":0.031098127},"labels":[],"label_agreement":null},{"id":"W2127218764","doi":"10.1061/9780784412329.054","title":"Schedule Assessment and Evaluation","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University","keywords":"Schedule; Computer science; Scheduling (production processes); Operations research; Engineering management; Earned value management; Project management; Set (abstract data type); Risk analysis (engineering); Systems engineering; Project planning; Operations management; Engineering; Project charter; Business","score_opus":0.4041477664162544,"score_gpt":0.5690312109886859,"score_spread":0.16488344457243154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127218764","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.061842147,0.0012199873,0.7475924,0.0011757582,0.0015574088,0.016989665,0.0088955015,0.012999645,0.14772746],"genre_scores_gemma":[0.26550716,0.0020705978,0.6368962,0.0002710174,0.0003887732,0.007104513,0.013244228,0.0026058666,0.07191166],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9760962,0.007184046,0.0023304617,0.0017577799,0.0119261835,0.0007053709],"domain_scores_gemma":[0.93880904,0.009602156,0.004002468,0.005295304,0.0406529,0.0016380504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020091927,0.0017309545,0.001267058,0.009012866,0.0013709723,0.0038594073,0.0021451325,0.00072420266,0.025607869],"category_scores_gemma":[0.062195968,0.00048409472,0.0008719687,0.0049091126,0.00064926554,0.0023261781,0.002271708,0.0009349515,0.008599166],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006497699,0.00030136068,0.007925093,0.00082146795,0.00008559244,0.00014297418,0.0009775127,0.015060477,0.004355845,0.011358372,0.050525215,0.9077964],"study_design_scores_gemma":[0.00035402432,0.0024311058,0.04642624,0.0014934406,0.0003020761,0.0005668272,0.005019938,0.19342326,0.03176915,0.025209876,0.69241375,0.0005902401],"about_ca_topic_score_codex":0.008596792,"about_ca_topic_score_gemma":0.0072595915,"teacher_disagreement_score":0.025607869,"about_ca_system_score_codex":0.0032101169,"about_ca_system_score_gemma":0.008146429,"threshold_uncertainty_score":0.1062575},"labels":[],"label_agreement":null},{"id":"W2127443348","doi":"10.5539/jsd.v5n1p55","title":"A Second Look: Stakeholders’ Perceptions of Some Issues in Design-Bid-Build Procurement Practice in Nigeria","year":2011,"lang":"en","type":"article","venue":"Journal of Sustainable Development","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Procurement; Documentation; Stakeholder; Business; Marketing; Descriptive statistics; Perception; Public sector; Product (mathematics); Public relations; Operations management; Economics; Psychology; Computer science; Political science","score_opus":0.12858064677168707,"score_gpt":0.34890130711759715,"score_spread":0.22032066034591008,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127443348","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9980076,0.00006801615,0.00018963541,0.00043651075,0.0000048076618,0.000011493213,0.000007571813,8.9036337e-7,0.0012734464],"genre_scores_gemma":[0.9992424,0.0001165953,0.000110901135,0.00010587924,0.000002681284,0.000010515968,0.000006123728,8.9601815e-7,0.0004040913],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99781334,0.0012131331,0.00015895725,0.00010032729,0.00031458444,0.00039968098],"domain_scores_gemma":[0.9949478,0.0025778126,0.0011007626,0.00009268724,0.000719647,0.0005612859],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003868066,0.00021692037,0.00029193703,0.00078009086,0.002788491,0.002201001,0.0002733662,0.0010544444,0.002838802],"category_scores_gemma":[0.006574899,0.00032776172,0.00023436184,0.00063442375,0.0020070462,0.0026770784,0.0016821895,0.0015269921,0.00017499378],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012648845,0.0001747416,0.1166451,0.00022560144,0.000011587064,0.0021198299,0.86156934,0.000110142275,0.0058665113,0.0015661935,0.0004023914,0.011182172],"study_design_scores_gemma":[0.000002225396,0.00015529948,0.024899708,0.00006147602,0.0000036649662,0.0003404418,0.97212875,0.00012844206,0.00034988017,0.00017942871,0.0017370066,0.000013701975],"about_ca_topic_score_codex":0.0044656615,"about_ca_topic_score_gemma":0.0059932354,"teacher_disagreement_score":0.0044656615,"about_ca_system_score_codex":0.0014381525,"about_ca_system_score_gemma":0.0010510875,"threshold_uncertainty_score":0.020456553},"labels":[],"label_agreement":null},{"id":"W2129745194","doi":"10.1139/l11-019","title":"A fuzzy logic model for benchmarking the knowledge management performance of construction firms","year":2011,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Benchmarking; Vagueness; Knowledge management; Computer science; Fuzzy logic; Competitive advantage; Process (computing); Fuzzy set; Process management; Business; Marketing; Artificial intelligence","score_opus":0.0789114495002483,"score_gpt":0.2711843281604499,"score_spread":0.1922728786602016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2129745194","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08187441,0.00033344622,0.87809885,0.0014580479,0.000060823888,0.00021563176,0.00047187015,0.00025526958,0.037231684],"genre_scores_gemma":[0.8767449,0.0002521825,0.11774548,0.00010362271,0.000027264092,0.00028408994,0.00025321325,0.000013737069,0.0045754137],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987901,0.0005493643,0.000064940454,0.0001552288,0.00030746328,0.00013299155],"domain_scores_gemma":[0.9982551,0.0010867845,0.00018703396,0.00006198808,0.00033549225,0.00007363801],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025320998,0.0005520465,0.00059975416,0.0017203449,0.00078063115,0.0024942982,0.0018363983,0.0013877823,0.003682599],"category_scores_gemma":[0.0059081553,0.00021076947,0.0006637707,0.001999026,0.0007392108,0.0020557167,0.00068172056,0.00075779756,0.00036724718],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006985733,0.00009157727,0.0014606405,0.000041851585,0.000031684434,0.00013470232,0.00021605103,0.87643296,0.00052511395,0.09945439,0.00094311486,0.02059806],"study_design_scores_gemma":[0.000010769712,0.000022029379,0.00021493484,0.000009426186,0.000008833935,0.000012876488,0.000037769303,0.9818875,0.00011856886,0.017177733,0.000489102,0.000010408641],"about_ca_topic_score_codex":0.022325166,"about_ca_topic_score_gemma":0.013099376,"teacher_disagreement_score":0.022325166,"about_ca_system_score_codex":0.0038190137,"about_ca_system_score_gemma":0.0020427783,"threshold_uncertainty_score":0.04439044},"labels":[],"label_agreement":null},{"id":"W2131384871","doi":"10.1139/l05-128","title":"The innovation process: adoption of information and communication technology for the construction industry","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Information and Communications Technology; Process (computing); Relevance (law); Macro; Knowledge management; Relation (database); Information technology; Key (lock); Computer science; Process management; Engineering","score_opus":0.019462628108008074,"score_gpt":0.26150552060955845,"score_spread":0.24204289250155037,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2131384871","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6675633,0.02408069,0.08047061,0.018738158,0.0002511558,0.0004973115,0.00022637441,0.00010107155,0.20807137],"genre_scores_gemma":[0.9817529,0.0058873207,0.008770697,0.00019811721,0.000052790536,0.00011979116,0.00006339222,0.0000105117115,0.0031444575],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9973347,0.0012863533,0.00009622798,0.0001015656,0.0008220246,0.00035922212],"domain_scores_gemma":[0.9946296,0.0041836463,0.00045730922,0.000106294174,0.00045722505,0.00016589153],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002979521,0.0003455448,0.00020977427,0.0029582968,0.0015539046,0.00355577,0.00048591665,0.0018651852,0.0014530115],"category_scores_gemma":[0.011620402,0.00015460157,0.00038850753,0.0045024194,0.003090945,0.004397231,0.0017444063,0.0011167927,0.00016580669],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013824945,0.00025001887,0.045159165,0.00085833215,0.000036215104,0.0014452446,0.03023651,0.012195348,0.00142327,0.69892716,0.0033096166,0.2060208],"study_design_scores_gemma":[0.0000711956,0.0010023199,0.19755404,0.0020786698,0.0001833379,0.0032315732,0.06699991,0.07990543,0.0057843155,0.40120894,0.24172895,0.00025135302],"about_ca_topic_score_codex":0.019964952,"about_ca_topic_score_gemma":0.018982135,"teacher_disagreement_score":0.019964952,"about_ca_system_score_codex":0.0068435995,"about_ca_system_score_gemma":0.006844348,"threshold_uncertainty_score":0.049654007},"labels":[],"label_agreement":null},{"id":"W2132018921","doi":"10.5555/1351542.1351911","title":"Modeling and representation of non-value adding activities due to errors and changes in design and construction projects","year":2007,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Schedule; Value (mathematics); Computer science; Chart; Bridge (graph theory); Representation (politics); Project management; Bar chart; Earned value management; Operations research; Simulation modeling; Industrial engineering; Simulation; Engineering; Systems engineering; Project planning; Mathematics","score_opus":0.16049184045304105,"score_gpt":0.3970550487593142,"score_spread":0.23656320830627314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2132018921","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5554292,0.00021934947,0.42783552,0.0004393077,0.0000627919,0.00026588878,0.00076837273,0.00052875327,0.014450814],"genre_scores_gemma":[0.9738437,0.00020972623,0.022476032,0.000015525502,0.0000076208826,0.00015961248,0.00027462453,0.00003092872,0.0029822],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999223,0.00030761326,0.000058166486,0.000106652136,0.00019708906,0.00010745551],"domain_scores_gemma":[0.99791044,0.0011458934,0.0004770048,0.00012136687,0.00026210395,0.00008311954],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00093299017,0.00073559314,0.00045461507,0.0010226313,0.00036774238,0.001476104,0.0011082296,0.0011300117,0.00225897],"category_scores_gemma":[0.0035841032,0.0005636764,0.00067849434,0.0008888905,0.0005385197,0.0011812206,0.00069281296,0.00078622013,0.0002681674],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018222196,0.000024769188,0.0015444836,0.000010683352,0.000007551129,0.00004736965,0.00003826976,0.9944653,0.00042065114,0.0019378327,0.00004399449,0.0014408656],"study_design_scores_gemma":[0.0000061044234,0.000015100009,0.00051001477,0.0000032984203,0.0000064333312,0.000011144002,0.00002120457,0.99817216,0.000340094,0.000694076,0.00021583556,0.000004474123],"about_ca_topic_score_codex":0.024188379,"about_ca_topic_score_gemma":0.016818944,"teacher_disagreement_score":0.024188379,"about_ca_system_score_codex":0.0014724517,"about_ca_system_score_gemma":0.0020835903,"threshold_uncertainty_score":0.048095167},"labels":[],"label_agreement":null},{"id":"W2135094073","doi":"","title":"Value or Vise? – Project Management Implementation at a Canadian Research Institute","year":2011,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Political science; Library science; Humanities; Context (archaeology); Management; Computer science; Geography; Art","score_opus":0.29099111550357465,"score_gpt":0.48897307853673505,"score_spread":0.1979819630331604,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135094073","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":"evaluation","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":"evaluation","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3158673,0.005850288,0.007401899,0.12861146,0.00073896407,0.0005973097,0.0006395002,0.00047343445,0.53981984],"genre_scores_gemma":[0.9219293,0.0031951969,0.01003475,0.004337684,0.00007852777,0.00022961428,0.00026466223,0.00016341575,0.059766736],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9403935,0.019965757,0.0012621622,0.0030069347,0.022350011,0.013021661],"domain_scores_gemma":[0.94009346,0.00934242,0.0033877685,0.0039426927,0.02720825,0.016025366],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.034111634,0.00048148882,0.0007484269,0.00398164,0.02605737,0.022132868,0.0051054345,0.0030719172,0.008803466],"category_scores_gemma":[0.045728702,0.0006909954,0.0008401125,0.008452462,0.013579647,0.0052574147,0.008438471,0.0047204206,0.0011104959],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":true,"study_design_scores_codex":[0.00037001923,0.00044469922,0.061778344,0.0009418468,0.00018450156,0.0014619383,0.15064378,0.0025734273,0.0040071052,0.35428986,0.0754711,0.34783337],"study_design_scores_gemma":[0.000057746984,0.00033712605,0.1250597,0.0013822913,0.00014682152,0.00031023214,0.15350623,0.0015382677,0.0025299941,0.010000119,0.70476925,0.00036225768],"about_ca_topic_score_codex":0.9511751,"about_ca_topic_score_gemma":0.9760385,"teacher_disagreement_score":0.9658884,"about_ca_system_score_codex":0.2804408,"about_ca_system_score_gemma":0.47996843,"threshold_uncertainty_score":0.8345867},"labels":[],"label_agreement":null},{"id":"W2135214953","doi":"","title":"Different Cost Performance: Different Determinants? The Case of Cost Overruns in Dutch Transport Infrastructure Projects","year":2012,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":42,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Business; Cost overrun; Transport infrastructure; Transport engineering; Finance; Environmental planning; Engineering; Construction engineering; Environmental science; Construction industry","score_opus":0.03673228480745104,"score_gpt":0.3252213997285882,"score_spread":0.28848911492113716,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135214953","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99467033,0.00016861083,0.00027366882,0.0007377483,0.0000035323321,0.000006978667,0.00003528072,0.000001802749,0.0041019446],"genre_scores_gemma":[0.99968946,0.000034855184,0.000027478898,0.000011905475,0.0000026648997,0.0000022601314,0.000013810658,0.000001396291,0.00021627602],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99454594,0.0021049182,0.00029981538,0.000333997,0.00057254644,0.002142771],"domain_scores_gemma":[0.97651935,0.012946491,0.0055034417,0.00070350023,0.002295051,0.002032186],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004218063,0.00025220308,0.000603682,0.0016778918,0.0012406837,0.004437446,0.0009709686,0.0022115777,0.004050629],"category_scores_gemma":[0.0269676,0.00031197985,0.00060240267,0.0030589695,0.0021395832,0.0035125483,0.0025093441,0.0017380947,0.00018168295],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011740436,0.0008023526,0.8227335,0.00018235286,0.0003257451,0.006256012,0.0076268027,0.036785353,0.0011573491,0.09124648,0.0018512235,0.029858839],"study_design_scores_gemma":[0.00004078837,0.00019425296,0.9205181,0.00010827604,0.00020120192,0.0006219244,0.024371278,0.026721697,0.0007382225,0.023608819,0.0027724244,0.0001029269],"about_ca_topic_score_codex":0.06326082,"about_ca_topic_score_gemma":0.06644793,"teacher_disagreement_score":0.06326082,"about_ca_system_score_codex":0.0049523287,"about_ca_system_score_gemma":0.002408512,"threshold_uncertainty_score":0.12578523},"labels":[],"label_agreement":null},{"id":"W2135762522","doi":"10.1061/9780784413517.143","title":"Emerging Project Procurement Trends in the Canadian Construction Industry","year":2014,"lang":"en","type":"article","venue":"Construction Research Congress 2014","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Positive Living North; Northern Alberta Institute of Technology; Alberta Environment and Protected Areas","funders":"","keywords":"Procurement; Business; Status quo; Popularity; Chief procurement officer; Likert scale; Work (physics); Construction industry; Marketing; Request for proposal; Knowledge management; Public relations; Engineering; Computer science; Economics; Construction engineering","score_opus":0.20003851892908145,"score_gpt":0.46775261801291773,"score_spread":0.26771409908383625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135762522","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9170372,0.0059330454,0.0013563564,0.0075867698,0.00006946812,0.00008986561,0.001055267,0.000058932266,0.066813126],"genre_scores_gemma":[0.9837924,0.0050553754,0.0010347214,0.0002619046,0.000013351295,0.000022493976,0.00046267768,0.000020340574,0.009336618],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99348456,0.00045776198,0.000197854,0.0004099118,0.004006242,0.0014436328],"domain_scores_gemma":[0.98814046,0.00092004763,0.0009975985,0.00017585023,0.008343273,0.0014228317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039903447,0.00026711557,0.00027541458,0.005268311,0.004941379,0.0051543023,0.0018056133,0.0006691499,0.0043324665],"category_scores_gemma":[0.0066297166,0.0002789374,0.0002824167,0.01369912,0.0021504099,0.0013597686,0.0017625919,0.0010635853,0.000396257],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052742765,0.00022232179,0.42973915,0.0014569057,0.000065195396,0.0022621395,0.08796611,0.0032035885,0.0045614927,0.04290715,0.026894512,0.400194],"study_design_scores_gemma":[0.000007686721,0.000093221795,0.71366936,0.0003958091,0.000024847328,0.0004732426,0.13335101,0.0021253321,0.0006770401,0.0007693015,0.14831324,0.00009990486],"about_ca_topic_score_codex":0.96849793,"about_ca_topic_score_gemma":0.98775566,"teacher_disagreement_score":0.080204226,"about_ca_system_score_codex":0.080204226,"about_ca_system_score_gemma":0.086928636,"threshold_uncertainty_score":0.58192515},"labels":[],"label_agreement":null},{"id":"W2136189887","doi":"10.1177/0840470414562638","title":"Using the project management office to connect the dots between projects and strategy","year":2015,"lang":"en","type":"review","venue":"Healthcare Management Forum","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Centre for Addiction and Mental Health","funders":"","keywords":"Business; PMOS logic; Health care; Function (biology); Quality (philosophy); Process management; Knowledge management; Total quality management; Quality management; Marketing; Computer science; Engineering; Political science; Service (business)","score_opus":0.5356657015708463,"score_gpt":0.5240479749776038,"score_spread":0.01161772659324245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2136189887","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0009513276,0.9013182,0.019912232,0.021819986,0.0029122455,0.00023369069,0.00014238275,0.0002583843,0.05245162],"genre_scores_gemma":[0.016530437,0.9324645,0.024950135,0.008146179,0.0010147422,0.00037401333,0.00023890122,0.00008844895,0.016192626],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9948302,0.00246091,0.0006140885,0.0004064116,0.001443069,0.00024537538],"domain_scores_gemma":[0.9915637,0.0047308393,0.0013926068,0.00048149237,0.001304133,0.0005273129],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005391477,0.0010342741,0.0008528442,0.004700712,0.0011026069,0.0047172876,0.001559394,0.0035204128,0.011921738],"category_scores_gemma":[0.012422884,0.0004785784,0.0006733018,0.008459439,0.0029854507,0.0073580826,0.0046400814,0.00403515,0.006029366],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002019879,0.00006821014,0.0004136434,0.010462075,0.000059290713,0.00021529826,0.0010157573,0.00033124987,0.00044964373,0.0823785,0.070849515,0.8337365],"study_design_scores_gemma":[0.000008964588,0.000026501686,0.00043171548,0.0054449183,0.000011824751,0.00031456517,0.00045251334,0.00005379271,0.00013959224,0.008767968,0.98433346,0.000014141257],"about_ca_topic_score_codex":0.002266191,"about_ca_topic_score_gemma":0.004568715,"teacher_disagreement_score":0.011921738,"about_ca_system_score_codex":0.0017425225,"about_ca_system_score_gemma":0.00814106,"threshold_uncertainty_score":0.039882183},"labels":[],"label_agreement":null},{"id":"W2136783427","doi":"10.1061/(asce)is.1943-555x.0000275","title":"An Integrated Productivity-Practices Implementation Index for Planning the Execution of Infrastructure Projects","year":2015,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Construction Industry Council","keywords":"Productivity; Index (typography); Business; Computer science; Critical infrastructure; Engineering management; Operations research; Engineering; Operations management; Process management; Computer security; Economics","score_opus":0.12214847885875682,"score_gpt":0.436768042253596,"score_spread":0.3146195633948392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2136783427","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6736959,0.0013021847,0.23202024,0.001219442,0.00016868894,0.0026563401,0.008528329,0.0019703265,0.0784386],"genre_scores_gemma":[0.73087764,0.00063438516,0.2567198,0.000065864944,0.00003974212,0.0015400636,0.006685117,0.00007810199,0.0033592659],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9888416,0.0025896234,0.0015668432,0.00051438936,0.006033327,0.0004542419],"domain_scores_gemma":[0.9735371,0.0073205717,0.008196796,0.0014137125,0.008133127,0.0013986862],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008966736,0.0007604289,0.0006357715,0.009463445,0.0007035496,0.0026535352,0.0010080189,0.0005052947,0.0026778078],"category_scores_gemma":[0.024711762,0.0002860318,0.0007582133,0.008332275,0.00040173507,0.0024493004,0.0019804556,0.0008353322,0.00064428285],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002159576,0.0009950452,0.34017998,0.0011751376,0.0003413594,0.0001076062,0.0018988842,0.01689166,0.0035964847,0.00551195,0.00793294,0.621153],"study_design_scores_gemma":[0.000068124915,0.0023617055,0.8890853,0.0007514713,0.0002697537,0.00032792648,0.005768342,0.045513485,0.00783657,0.006397745,0.041418117,0.00020139155],"about_ca_topic_score_codex":0.004685397,"about_ca_topic_score_gemma":0.009864815,"teacher_disagreement_score":0.009463445,"about_ca_system_score_codex":0.0034660297,"about_ca_system_score_gemma":0.005833597,"threshold_uncertainty_score":0.047421157},"labels":[],"label_agreement":null},{"id":"W2137444796","doi":"10.1108/13598541011068305","title":"Determinants of construction companies' use of web‐based interorganizational information systems","year":2010,"lang":"en","type":"article","venue":"Supply Chain Management An International Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Polytechnique Montréal; Université du Québec à Montréal","funders":"","keywords":"Business; Supply chain; Originality; Supply chain management; Empirical research; Knowledge management; Marketing; Process management; Computer science; Qualitative research","score_opus":0.03778973816556826,"score_gpt":0.32318259234577107,"score_spread":0.2853928541802028,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2137444796","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99680835,0.00014207928,0.00042040096,0.00021616809,0.0000016792167,0.000028377537,0.000050865194,0.000008801554,0.0023232438],"genre_scores_gemma":[0.9993814,0.00009589357,0.00028827213,0.000018034492,0.0000013931598,0.0000064115725,0.000040748626,0.0000018881312,0.00016579672],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9969894,0.00093182054,0.00021558002,0.00016661656,0.001211807,0.00048481178],"domain_scores_gemma":[0.9564125,0.021086138,0.011502007,0.0019702916,0.005585923,0.0034431566],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027027372,0.00016039266,0.00011365801,0.0015235846,0.000568819,0.002557436,0.0002829072,0.0003166198,0.0014654631],"category_scores_gemma":[0.018065317,0.00021870199,0.00018491763,0.0020572483,0.00094552134,0.0008934474,0.0009795583,0.00061024853,0.00021531455],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023999966,0.00009189579,0.97983354,0.00005692221,0.000032640044,0.0000870085,0.002150334,0.0004739979,0.0006621584,0.00033221737,0.00017369377,0.016081437],"study_design_scores_gemma":[0.0000034829366,0.000070823684,0.9910924,0.000030001735,0.0000157671,0.00008324791,0.006091518,0.00073725963,0.00030871737,0.00008818277,0.0014696269,0.000008925088],"about_ca_topic_score_codex":0.032855254,"about_ca_topic_score_gemma":0.050932754,"teacher_disagreement_score":0.032855254,"about_ca_system_score_codex":0.0018868659,"about_ca_system_score_gemma":0.003747097,"threshold_uncertainty_score":0.065328},"labels":[],"label_agreement":null},{"id":"W2138973930","doi":"10.1002/j.2334-5837.2015.00099.x","title":"An Innovative Approach to the Development of Project Management Processes for Small‐scale Projects in a large Engineering Company","year":2015,"lang":"en","type":"article","venue":"INCOSE International Symposium","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Tetra Tech (Canada); École de Technologie Supérieure","funders":"","keywords":"Engineering management; Project management; Project planning; Scale (ratio); Project management triangle; Program management; OPM3; Process (computing); Process management; Extreme project management; Engineering; Systems engineering; Computer science","score_opus":0.11016375753248382,"score_gpt":0.36320269626187646,"score_spread":0.25303893872939265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2138973930","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17417932,0.00020484843,0.796124,0.0015730432,0.00009151032,0.003408467,0.00005135923,0.0012332201,0.023134291],"genre_scores_gemma":[0.18246281,0.00011892083,0.81342745,0.000109452965,0.000018055409,0.0006719549,0.000053914548,0.000046188972,0.0030913197],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9932633,0.0032899163,0.00027772057,0.0005383533,0.002228465,0.00040221328],"domain_scores_gemma":[0.9942325,0.0023492442,0.0005386599,0.000807738,0.0015802108,0.0004916145],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0066142427,0.0005977987,0.000314773,0.0013766695,0.0019305889,0.0034516614,0.002137068,0.0012085428,0.0019351201],"category_scores_gemma":[0.007015973,0.0006003567,0.0007109335,0.0009809602,0.0014145027,0.001722,0.0024222569,0.0015427456,0.0004244652],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005049693,0.0049300813,0.007926246,0.00093628524,0.000106580526,0.0020356923,0.012211323,0.06733636,0.082519606,0.07899912,0.004931278,0.7375624],"study_design_scores_gemma":[0.00120303,0.0065349624,0.017488541,0.000940856,0.0003883623,0.003441275,0.011372832,0.6190546,0.08361068,0.04264288,0.21287358,0.0004483394],"about_ca_topic_score_codex":0.0052430457,"about_ca_topic_score_gemma":0.007641263,"teacher_disagreement_score":0.0066142427,"about_ca_system_score_codex":0.0033727346,"about_ca_system_score_gemma":0.0125865545,"threshold_uncertainty_score":0.03497988},"labels":[],"label_agreement":null},{"id":"W2139581178","doi":"10.1061/(asce)0733-9364(2003)129:5(518)","title":"Evaluating Risk in Construction–Schedule Model (ERIC–S): Construction Schedule Risk Model","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":152,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada; Microsoft Research","keywords":"Schedule; Duration (music); Computer science; Operations research; Risk analysis (engineering); Engineering","score_opus":0.059510544715074366,"score_gpt":0.3324887915624477,"score_spread":0.2729782468473733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2139581178","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11166115,0.0001948366,0.8673159,0.00052194233,0.000028651706,0.0003423323,0.00035629465,0.00022389143,0.019355038],"genre_scores_gemma":[0.8412453,0.0002811871,0.15074448,0.000046450612,0.000023380035,0.0006298169,0.0003213975,0.00004919628,0.0066587646],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981002,0.00090250187,0.00008240708,0.0002254276,0.0005309635,0.00015834138],"domain_scores_gemma":[0.9957152,0.0028368528,0.00049711124,0.00017172578,0.00067580113,0.00010330137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034278869,0.00087366527,0.00064848445,0.0017460131,0.00056053174,0.001673608,0.0017827742,0.0011889951,0.0037857292],"category_scores_gemma":[0.010232111,0.00054780813,0.0009868428,0.0014002528,0.0006947738,0.001955306,0.0013175494,0.0011739894,0.0004084239],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006260023,0.000061019484,0.0034097256,0.00005306462,0.0000520676,0.00009882965,0.00021321488,0.9391326,0.00047169856,0.039021272,0.0005733598,0.01685061],"study_design_scores_gemma":[0.00001278963,0.000054806776,0.00084820203,0.000016403177,0.000030898365,0.00005033095,0.000059423925,0.98021543,0.00025048485,0.01736629,0.0010779576,0.00001698233],"about_ca_topic_score_codex":0.012949488,"about_ca_topic_score_gemma":0.008179322,"teacher_disagreement_score":0.012949488,"about_ca_system_score_codex":0.0021911447,"about_ca_system_score_gemma":0.0022528716,"threshold_uncertainty_score":0.025748253},"labels":[],"label_agreement":null},{"id":"W2139843113","doi":"10.1080/09613210010027701","title":"Public policy and construction innovation","year":2001,"lang":"en","type":"article","venue":"Building Research & Information","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":221,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Research Council Canada","keywords":"Public policy; Context (archaeology); Typology; Government (linguistics); Sustainability; Political science; Innovation system; National innovation system; Regional science; Politics; Public administration; Economic growth; Welfare economics; Economy; Sociology; Geography; Economics","score_opus":0.33360708584257454,"score_gpt":0.47896688949047006,"score_spread":0.14535980364789552,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2139843113","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09511092,0.019439168,0.011175257,0.086117886,0.000491132,0.00008216764,0.00017087944,0.00008672443,0.78732586],"genre_scores_gemma":[0.96302825,0.0076069194,0.0012623394,0.0027851649,0.0002235949,0.000091083115,0.00007327896,0.000031504474,0.024897728],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9925107,0.003435508,0.00022265308,0.00059429614,0.0013069486,0.0019298932],"domain_scores_gemma":[0.98799276,0.008742351,0.0012241768,0.0007518276,0.00079566194,0.0004930997],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00816562,0.00033621653,0.0004674047,0.004287923,0.004161408,0.010351945,0.0009025202,0.004230376,0.011994325],"category_scores_gemma":[0.013409532,0.0002691574,0.0006406594,0.0053346567,0.015883455,0.0048068846,0.0053382963,0.0021571962,0.0006760674],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018379234,0.000037352023,0.0012519633,0.00009967562,0.000009089666,0.000080173304,0.002081847,0.0014091239,0.00006533397,0.9727774,0.0020859847,0.020083692],"study_design_scores_gemma":[0.000041244824,0.00006994763,0.0074992166,0.001138576,0.00004588349,0.00029010908,0.01158751,0.0020101047,0.0006710904,0.6212586,0.3553504,0.00003733558],"about_ca_topic_score_codex":0.0070243296,"about_ca_topic_score_gemma":0.007097534,"teacher_disagreement_score":0.012579368,"about_ca_system_score_codex":0.012579368,"about_ca_system_score_gemma":0.0099887885,"threshold_uncertainty_score":0.09127015},"labels":[],"label_agreement":null},{"id":"W2140445176","doi":"10.1061/9780784412688.083","title":"Critical Success Factors for Different Organizations in Construction Projects","year":2012,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Critical success factor; Construction industry; Project management; Business; Engineering; Rank (graph theory); Knowledge management; Engineering management; Process management; Construction engineering; Computer science","score_opus":0.10788170280236926,"score_gpt":0.3972565490773079,"score_spread":0.28937484627493865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2140445176","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99395657,0.00021060687,0.0007638303,0.00024554104,0.000012243216,0.00008283182,0.000036705118,0.0000067507467,0.0046848906],"genre_scores_gemma":[0.99933964,0.000053939322,0.0003205495,0.000011894637,0.000005380058,0.00002392103,0.000022367367,0.0000024708095,0.00021990722],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99220735,0.0025631392,0.00073119235,0.00044817515,0.0025520169,0.0014981453],"domain_scores_gemma":[0.92930764,0.03103283,0.01488356,0.0009972444,0.008832278,0.014946451],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00709662,0.00044935162,0.0002893884,0.004969125,0.0020824347,0.0035286963,0.00044790914,0.0007356082,0.0037128367],"category_scores_gemma":[0.040119983,0.00023635273,0.00042933616,0.0024474103,0.0018011567,0.0010828262,0.002280924,0.0009055574,0.00031610613],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036608533,0.00032518193,0.94538283,0.00017138482,0.00009446905,0.0004532722,0.012909274,0.0007027313,0.00084394135,0.0027760384,0.0006025966,0.035372168],"study_design_scores_gemma":[0.00002137766,0.000440327,0.9532446,0.00017602764,0.000045445853,0.0003997994,0.038816206,0.0013392408,0.00044555616,0.0015486983,0.00347563,0.000046979323],"about_ca_topic_score_codex":0.0043455125,"about_ca_topic_score_gemma":0.005114656,"teacher_disagreement_score":0.00709662,"about_ca_system_score_codex":0.0027407634,"about_ca_system_score_gemma":0.0035197171,"threshold_uncertainty_score":0.03753096},"labels":[],"label_agreement":null},{"id":"W2140577467","doi":"10.5539/ass.v11n9p281","title":"Impact of Organizational Culture on Knowledge Management Process in Construction","year":2015,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Knowledge management; Knowledge sharing; Structural equation modeling; Process (computing); Organizational culture; Organizational learning; Business; Key (lock); Set (abstract data type); Empirical research; Process management; Computer science; Management; Mathematics; Economics","score_opus":0.05390261916993899,"score_gpt":0.41001980231257673,"score_spread":0.35611718314263774,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2140577467","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9961927,0.00009134831,0.0002595277,0.00015448089,0.000004248972,0.000010614851,0.000006372844,0.0000019470174,0.0032786625],"genre_scores_gemma":[0.9996648,0.000043140597,0.00007276337,0.000013521095,0.0000015915152,0.000003724107,0.000005387591,5.825294e-7,0.00019444649],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9946331,0.002725229,0.0003075714,0.00024859453,0.0012236288,0.000861938],"domain_scores_gemma":[0.9758537,0.0114523135,0.005450106,0.0014609331,0.0028437525,0.0029392526],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004445192,0.00015936911,0.00013649762,0.0007187216,0.001202102,0.00269593,0.00029859287,0.00036417166,0.001769048],"category_scores_gemma":[0.01600175,0.00011388822,0.00024398633,0.000591637,0.001483947,0.00093645055,0.0016695068,0.000632866,0.00016099836],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017518751,0.0005127775,0.9063967,0.00012515491,0.00009229963,0.0003600545,0.018856304,0.0015140321,0.0013572403,0.0027130467,0.00037861653,0.0675186],"study_design_scores_gemma":[0.000011847774,0.00036892758,0.9633226,0.00012763677,0.00005066505,0.0001486491,0.029103901,0.0024147467,0.0011633851,0.0010535001,0.0022060103,0.000028176633],"about_ca_topic_score_codex":0.0045415605,"about_ca_topic_score_gemma":0.008238431,"teacher_disagreement_score":0.0045415605,"about_ca_system_score_codex":0.0022827608,"about_ca_system_score_gemma":0.0036087807,"threshold_uncertainty_score":0.023508728},"labels":[],"label_agreement":null},{"id":"W2140592197","doi":"10.1002/pmj.20248","title":"The “Management-Per-Result” Approach to International Development Project Design","year":2011,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec en Outaouais","funders":"","keywords":"Project management; Project management triangle; Technocracy; Process (computing); Project planning; Project portfolio management; Work breakdown structure; Function (biology); Computer science; Process management; Extreme project management; Engineering management; Project charter; Engineering; Systems engineering; OPM3","score_opus":0.24384917493994224,"score_gpt":0.3696612719636246,"score_spread":0.12581209702368235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2140592197","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034113962,0.00040602303,0.96236086,0.0038051473,0.00010982164,0.0006261708,0.000057203706,0.00033334998,0.02889002],"genre_scores_gemma":[0.10085848,0.00040519968,0.8924275,0.0006764783,0.00009398165,0.0016141989,0.00008309109,0.00018446415,0.0036564942],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.91382873,0.06242775,0.004030265,0.004187984,0.014027066,0.0014981907],"domain_scores_gemma":[0.9715298,0.0139740985,0.0034191923,0.0041105426,0.005652196,0.001314079],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.061234683,0.0023934052,0.0012294481,0.0062166774,0.0034151687,0.01280024,0.0049003577,0.00275424,0.004405817],"category_scores_gemma":[0.036013603,0.0013927566,0.0017888228,0.0033523126,0.01322795,0.007921586,0.0056272014,0.004397655,0.0014009418],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001309916,0.00025218874,0.0023654061,0.0012889579,0.00018131726,0.00021142293,0.0052883667,0.020501891,0.0021137162,0.7349955,0.005202254,0.2274681],"study_design_scores_gemma":[0.00026769988,0.0013682875,0.002591141,0.0011766972,0.00035181575,0.0006245912,0.004125091,0.05264597,0.0068351636,0.73224115,0.19749728,0.0002751767],"about_ca_topic_score_codex":0.0017161164,"about_ca_topic_score_gemma":0.003023146,"teacher_disagreement_score":0.061234683,"about_ca_system_score_codex":0.01162319,"about_ca_system_score_gemma":0.014887245,"threshold_uncertainty_score":0.32384384},"labels":[],"label_agreement":null},{"id":"W2142133535","doi":"10.1177/0950017012460315","title":"Controlling the uncontrollable: ‘Agile’ teams and illusions of autonomy in creative work","year":2013,"lang":"en","type":"article","venue":"Work Employment and Society","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":180,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec en Outaouais","funders":"","keywords":"Agile software development; Autonomy; Creativity; Context (archaeology); Studio; Coaching; Work (physics); Empowerment; Control (management); Public relations; Knowledge management; Sociology; Business; Management; Political science; Engineering; Psychology; Computer science; Social psychology; Economics; Geography","score_opus":0.02946358122243884,"score_gpt":0.29285472728642814,"score_spread":0.2633911460639893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2142133535","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89288574,0.00094687863,0.02033203,0.0087740915,0.000047259076,0.00003596416,0.0000101090045,0.000029123248,0.07693882],"genre_scores_gemma":[0.9989336,0.000079984056,0.00043436384,0.000063191976,0.000004892025,0.0000054704024,0.0000010487377,0.0000035362748,0.00047394747],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99227625,0.004892256,0.00012545375,0.0004124294,0.0014270453,0.0008664899],"domain_scores_gemma":[0.9914693,0.0054441616,0.001171737,0.00066809927,0.000417988,0.00082858006],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007747552,0.00028243018,0.00016724097,0.0011624846,0.0048058764,0.008256228,0.0010426542,0.0012587035,0.0012882813],"category_scores_gemma":[0.010374284,0.00028590148,0.00019892064,0.00063255185,0.06414304,0.0046782484,0.006960927,0.0022965304,0.00009001451],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001432309,0.00007772803,0.0114654545,0.00006581051,0.000014034307,0.00082641176,0.61017174,0.0012696481,0.002019298,0.337915,0.00092624716,0.03510551],"study_design_scores_gemma":[0.00009031252,0.000187492,0.02456973,0.00028292497,0.000021114443,0.0008595482,0.6369582,0.005100653,0.0013698051,0.26950827,0.060924962,0.0001270236],"about_ca_topic_score_codex":0.022679746,"about_ca_topic_score_gemma":0.0203913,"teacher_disagreement_score":0.022679746,"about_ca_system_score_codex":0.0037202856,"about_ca_system_score_gemma":0.0039219796,"threshold_uncertainty_score":0.045095444},"labels":[],"label_agreement":null},{"id":"W2143765587","doi":"","title":"How does a new set of Earned Value Management schedule control work? A case study in IRAN","year":2009,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Earned value management; Schedule; Operations research; Control (management); Work (physics); Project management; Computer science; Set (abstract data type); Time management; Operations management; Project portfolio management; Engineering; Systems engineering; Artificial intelligence; OPM3","score_opus":0.10232023244589955,"score_gpt":0.3743327908090619,"score_spread":0.27201255836316235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143765587","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9542783,0.00023603342,0.02103408,0.0014290153,0.00004799473,0.000342615,0.000048148402,0.000085999156,0.022497818],"genre_scores_gemma":[0.966396,0.00021770381,0.031057693,0.000054017757,0.000019699784,0.00007653479,0.000047817528,0.00002023961,0.0021103488],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.9962728,0.0019097119,0.00017907869,0.0002250829,0.0010156749,0.00039767838],"domain_scores_gemma":[0.9971378,0.0011279572,0.0004788712,0.00028882036,0.00063075084,0.00033577048],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005937105,0.0003489429,0.0003516945,0.0011819504,0.0019565495,0.002292151,0.0015137324,0.0009814182,0.0011958765],"category_scores_gemma":[0.007472662,0.00028235262,0.00045961468,0.001879055,0.0015107442,0.0019805487,0.001069893,0.0010647562,0.0002269161],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006590417,0.0025714997,0.10274307,0.0006107649,0.000096203854,0.008562589,0.04670795,0.066643395,0.0074903816,0.078657806,0.0078019076,0.6774555],"study_design_scores_gemma":[0.00070929463,0.007657717,0.1661763,0.00040362318,0.00027458376,0.009394211,0.18266357,0.36330336,0.018963382,0.04005624,0.20996892,0.00042875862],"about_ca_topic_score_codex":0.012369935,"about_ca_topic_score_gemma":0.014694559,"teacher_disagreement_score":0.012369935,"about_ca_system_score_codex":0.004487972,"about_ca_system_score_gemma":0.0035729664,"threshold_uncertainty_score":0.032562673},"labels":[],"label_agreement":null},{"id":"W2144194965","doi":"10.5539/emr.v1n2p122","title":"Determining Critical Project Success Criteria for Public Housing Building Projects (PHBPS) in Ghana","year":2012,"lang":"en","type":"article","venue":"Engineering Management Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Critical success factor; Project management; Business; Questionnaire; Closure (psychology); Quality (philosophy); Operations management; Process management; Engineering; Economics","score_opus":0.37656521857558417,"score_gpt":0.512431491770986,"score_spread":0.13586627319540184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144194965","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9961844,0.0001397293,0.0009033267,0.00016990067,0.0000028037514,0.00017542265,0.00007477708,0.0000047252547,0.002344901],"genre_scores_gemma":[0.99835867,0.00007612834,0.0012922102,0.0000065218155,0.0000014972148,0.00009820633,0.000049952472,0.0000018492791,0.00011494499],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9935575,0.0023768274,0.0008883698,0.00019556738,0.002075325,0.0009063044],"domain_scores_gemma":[0.96267205,0.016834768,0.010425646,0.00032425576,0.0062018465,0.0035413522],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006892389,0.00037826377,0.00034624126,0.004838241,0.001448012,0.001929348,0.00048570783,0.00043581813,0.0018312713],"category_scores_gemma":[0.026523964,0.00028209834,0.0002175936,0.0039175036,0.0016588815,0.0012179636,0.0016470561,0.00043398092,0.00014990414],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003575944,0.0002971719,0.885542,0.0006098118,0.000044487515,0.0015077967,0.03347756,0.0015447268,0.002056874,0.003202991,0.0016959746,0.06966303],"study_design_scores_gemma":[0.000025467269,0.00059563393,0.9025386,0.0003815352,0.000020648191,0.0005395518,0.086212404,0.0031225733,0.0012039184,0.0016753906,0.0036427148,0.0000416118],"about_ca_topic_score_codex":0.00994782,"about_ca_topic_score_gemma":0.018029286,"teacher_disagreement_score":0.00994782,"about_ca_system_score_codex":0.0040760743,"about_ca_system_score_gemma":0.004126725,"threshold_uncertainty_score":0.036450863},"labels":[],"label_agreement":null},{"id":"W2144989766","doi":"10.3141/2081-05","title":"Rational Best-Value Model Based on Expected Performance","year":2008,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Minnesota Department of Transportation","keywords":"Best value; Procurement; Selection (genetic algorithm); Best practice; Ranking (information retrieval); Analytic hierarchy process; Value (mathematics); Flexibility (engineering); Agency (philosophy); Operations research; Integrated project delivery; Process (computing); Computer science; Operations management; Management science; Engineering; Project management; Business; Economics; Marketing; Systems engineering; Artificial intelligence; Machine learning","score_opus":0.27332370434442504,"score_gpt":0.4451407386773275,"score_spread":0.17181703433290246,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144989766","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.074733436,0.00031962816,0.8398481,0.0020110193,0.00010489933,0.0004935627,0.00058115955,0.0003564921,0.08155158],"genre_scores_gemma":[0.905588,0.00054451,0.06840801,0.00015612975,0.000058835012,0.00057929073,0.00041075848,0.000101613296,0.024152951],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99262494,0.00345072,0.0002500356,0.0008832596,0.0017807935,0.0010103406],"domain_scores_gemma":[0.99028754,0.006291622,0.00089928857,0.00049064826,0.0015354042,0.0004955164],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008258863,0.0017800125,0.0012786638,0.002202523,0.0008131806,0.0061571077,0.0032356586,0.00180692,0.009895905],"category_scores_gemma":[0.020150634,0.0006123935,0.0012876912,0.0019548992,0.0032245817,0.0048440094,0.0015990776,0.0018847899,0.0019300339],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000107058455,0.00013504655,0.0020554774,0.00007625765,0.000053272735,0.00014653336,0.00035698307,0.7076147,0.00042486322,0.27340934,0.0018720949,0.013748402],"study_design_scores_gemma":[0.000029288216,0.00009682156,0.0006056697,0.000035865407,0.000021380583,0.00004255903,0.0001425706,0.8993721,0.00017561688,0.097784854,0.001654599,0.000038763636],"about_ca_topic_score_codex":0.0092777945,"about_ca_topic_score_gemma":0.0061319224,"teacher_disagreement_score":0.009895905,"about_ca_system_score_codex":0.0052952096,"about_ca_system_score_gemma":0.0032210143,"threshold_uncertainty_score":0.04367757},"labels":[],"label_agreement":null},{"id":"W2146152604","doi":"10.1061/(asce)0742-597x(2008)24:3(173)","title":"Assessing Infrastructure Project Innovation Potential as a Function of Procurement Mode","year":2008,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; Shell (Canada)","funders":"Infrastructure Canada","keywords":"Integrated project delivery; Procurement; Business; General partnership; Process management; Process (computing); Function (biology); Variety (cybernetics); Stakeholder; Project management; Marketing; Finance; Economics; Systems engineering; Computer science; Engineering","score_opus":0.055131647583170476,"score_gpt":0.34441545465229045,"score_spread":0.28928380706912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2146152604","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.978583,0.00008280212,0.01312633,0.000052289524,0.0000042917927,0.0003653626,0.00027597262,0.0000701997,0.0074397367],"genre_scores_gemma":[0.9862135,0.000061979124,0.012274315,0.000008829746,0.0000030930332,0.00030641232,0.00018956498,0.0000133743915,0.0009289606],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9892079,0.0053867428,0.0008471805,0.0008843166,0.0030746832,0.0005991197],"domain_scores_gemma":[0.8977168,0.07645023,0.008978452,0.003482683,0.0114372065,0.0019345343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022124717,0.0005533677,0.0004524282,0.00535969,0.0006556445,0.0023324268,0.0007759188,0.0008377048,0.002278281],"category_scores_gemma":[0.05216537,0.00034860277,0.00088297896,0.003310759,0.0007635808,0.0024923945,0.0018590655,0.000661305,0.0004650725],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012991241,0.0007916664,0.7381012,0.00045104048,0.0002541755,0.0002817956,0.0028085657,0.099261045,0.013037462,0.0055962037,0.000555138,0.13756254],"study_design_scores_gemma":[0.00006749326,0.0068185315,0.7929137,0.0001835784,0.0002459129,0.00054737285,0.0055887136,0.16720738,0.017355857,0.0061100814,0.0027291204,0.00023224708],"about_ca_topic_score_codex":0.0017522933,"about_ca_topic_score_gemma":0.002809441,"teacher_disagreement_score":0.022124717,"about_ca_system_score_codex":0.0014247246,"about_ca_system_score_gemma":0.0014139282,"threshold_uncertainty_score":0.11700809},"labels":[],"label_agreement":null},{"id":"W2146613551","doi":"10.1002/pmj.20095","title":"Building Value through Sustainable Project Management Offices","year":2009,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":121,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"","keywords":"Project management; Project management triangle; Project portfolio management; Value (mathematics); Business; Implementation; Project charter; Extreme project management; PMOS logic; Process management; OPM3; Engineering management; Knowledge management; Computer science; Engineering; Management; Economics","score_opus":0.06871045519815498,"score_gpt":0.3977266080816777,"score_spread":0.3290161528835227,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2146613551","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5467199,0.00043798567,0.053734515,0.009349501,0.000057693924,0.00031003766,0.000042929023,0.00017264613,0.38917485],"genre_scores_gemma":[0.9863121,0.00016753955,0.008859344,0.0001496572,0.000016539043,0.00008095859,0.000013072884,0.000021582175,0.0043791686],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9919829,0.0050639845,0.00012512217,0.00031607898,0.0013279038,0.0011840891],"domain_scores_gemma":[0.9943515,0.0023043891,0.0009824383,0.00091389765,0.00055179326,0.000895999],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0061875307,0.0005201882,0.00030399478,0.0020953375,0.0056037307,0.009876829,0.001247735,0.0020236599,0.0036194765],"category_scores_gemma":[0.010548768,0.00043103326,0.0003795043,0.0019032566,0.013891185,0.008362206,0.011683844,0.0018213616,0.00053496717],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007056005,0.0002662855,0.012853268,0.00012543648,0.00002188032,0.0016020241,0.030066097,0.00324655,0.0016790556,0.8332303,0.0046398565,0.11219865],"study_design_scores_gemma":[0.000101716294,0.00042921922,0.009988901,0.0005191973,0.00004495676,0.0013629186,0.071482636,0.0077125113,0.004020881,0.6448524,0.2594117,0.000072984556],"about_ca_topic_score_codex":0.0007304188,"about_ca_topic_score_gemma":0.0017212427,"teacher_disagreement_score":0.009876829,"about_ca_system_score_codex":0.00370382,"about_ca_system_score_gemma":0.0056273905,"threshold_uncertainty_score":0.03272319},"labels":[],"label_agreement":null},{"id":"W2147714773","doi":"10.1287/inte.1100.0520","title":"Taking the Politics Out of Paving: Achieving Transportation Asset Management Excellence Through OR","year":2011,"lang":"en","type":"article","venue":"INFORMS Journal on Applied Analytics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Government of New Brunswick; Transport Canada","funders":"U.S. Department of Transportation","keywords":"Asset management; Asset (computer security); Business; Heuristic; Operations research; Transport engineering; Finance; Computer science; Engineering; Computer security","score_opus":0.20771048777770518,"score_gpt":0.372130339538934,"score_spread":0.1644198517612288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2147714773","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.089256905,0.0055050463,0.10196193,0.04356338,0.00039318713,0.00027643412,0.00017983674,0.00051792664,0.7583454],"genre_scores_gemma":[0.86895,0.0070016286,0.06453795,0.0031536235,0.00013534242,0.00009961932,0.00022944837,0.00018904387,0.05570325],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.996223,0.0016305964,0.00008992693,0.0002515054,0.0008053994,0.0009995408],"domain_scores_gemma":[0.9986602,0.00022061213,0.00019470642,0.0002131757,0.00038849976,0.00032281593],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004269236,0.00047322665,0.00031773563,0.0011642749,0.0023778952,0.009990015,0.0012391638,0.0008284311,0.0076933713],"category_scores_gemma":[0.0041852593,0.00018474105,0.0002957501,0.0019964306,0.003341814,0.006813734,0.0046308804,0.001001614,0.0013541443],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006996026,0.00012209422,0.0049024886,0.00022915888,0.00003383241,0.00016564387,0.0018181275,0.009861294,0.0008780235,0.64575565,0.028095573,0.30806813],"study_design_scores_gemma":[0.000033246444,0.00013636294,0.006175517,0.00074753264,0.000068836016,0.00017669662,0.013796837,0.019417768,0.0022710592,0.36722457,0.5898947,0.00005688547],"about_ca_topic_score_codex":0.032022446,"about_ca_topic_score_gemma":0.07729831,"teacher_disagreement_score":0.032022446,"about_ca_system_score_codex":0.0071757436,"about_ca_system_score_gemma":0.015351748,"threshold_uncertainty_score":0.063672125},"labels":[],"label_agreement":null},{"id":"W2148122553","doi":"10.5267/j.ijiec.2012.05.002","title":"Towards a synergy between project and supply chain management","year":2012,"lang":"en","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Supply chain; Supply chain management; Business; Process management; Supply chain risk management; Operations management; Project management; Environmental resource management; Industrial organization; Engineering; Systems engineering; Environmental science; Service management; Marketing","score_opus":0.09451826418339683,"score_gpt":0.3539001833903768,"score_spread":0.25938191920698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2148122553","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04739935,0.0020808945,0.9147987,0.003957459,0.00009095529,0.00019461615,0.00005004867,0.00019930032,0.031228648],"genre_scores_gemma":[0.6219105,0.0029735134,0.3685779,0.0003275833,0.00019387985,0.0003037728,0.00009614559,0.00005566364,0.0055611064],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99167573,0.004973123,0.00038395153,0.00071422465,0.0017801141,0.00047280244],"domain_scores_gemma":[0.99058706,0.004378234,0.001333922,0.0014308806,0.0012684277,0.0010015302],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009286951,0.0010702325,0.0008219014,0.002800743,0.0007100313,0.0068592746,0.0015719397,0.0017649906,0.00330479],"category_scores_gemma":[0.008285437,0.0008764584,0.00081222615,0.0031986316,0.0018881363,0.0094480505,0.008565555,0.0018141045,0.000895256],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013812895,0.0003539082,0.011017072,0.0007242204,0.00022432541,0.000576989,0.0024108952,0.05408388,0.004499854,0.5894217,0.0020439266,0.33450502],"study_design_scores_gemma":[0.00005486912,0.0005688955,0.0072170747,0.0008043396,0.00012778383,0.00061895524,0.003768509,0.18892583,0.0029270884,0.74406123,0.05084012,0.00008527107],"about_ca_topic_score_codex":0.00058612344,"about_ca_topic_score_gemma":0.0005604655,"teacher_disagreement_score":0.009286951,"about_ca_system_score_codex":0.0015000855,"about_ca_system_score_gemma":0.0046045166,"threshold_uncertainty_score":0.049114704},"labels":[],"label_agreement":null},{"id":"W2148875649","doi":"10.17722/ijrbt.v5i1.320","title":"Effects of Project Management Techniques on Primary Health Care Delivery","year":2014,"lang":"en","type":"article","venue":"International Journal of Research in Business and Technology","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Health care delivery; Primary care; Business; Medicine; Health care; Family medicine; Political science","score_opus":0.05654171757195631,"score_gpt":0.4412945137638997,"score_spread":0.3847527961919434,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2148875649","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98857284,0.001540575,0.0020274767,0.0008791353,0.000046576777,0.00043552692,0.00008036242,0.00004453025,0.006373013],"genre_scores_gemma":[0.99559826,0.00087201886,0.002598097,0.00010265035,0.00003913189,0.00020415589,0.000036314577,0.000007337142,0.0005420422],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9746242,0.018744338,0.0011145485,0.0005540524,0.0035787423,0.0013840982],"domain_scores_gemma":[0.9099833,0.06237479,0.015998684,0.0025201621,0.0049253143,0.0041976715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009527961,0.0004045567,0.0002479725,0.00154273,0.00087069796,0.001119599,0.0005402124,0.00042483394,0.002135528],"category_scores_gemma":[0.060745932,0.00027983854,0.0006392749,0.0012729295,0.00056585734,0.00062796474,0.0017945844,0.00080175884,0.00023799989],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016279573,0.0060324133,0.3651123,0.0015014848,0.0004887408,0.00067562493,0.00665825,0.0022247867,0.0031224734,0.00087588764,0.0011950746,0.61048496],"study_design_scores_gemma":[0.0003418332,0.015416657,0.95896536,0.001008357,0.0002870744,0.00082615594,0.009465084,0.0025659152,0.0017828817,0.00084348343,0.008424295,0.000072947616],"about_ca_topic_score_codex":0.0021732263,"about_ca_topic_score_gemma":0.0024032234,"teacher_disagreement_score":0.009527961,"about_ca_system_score_codex":0.0014201596,"about_ca_system_score_gemma":0.003520458,"threshold_uncertainty_score":0.05038929},"labels":[],"label_agreement":null},{"id":"W2149475851","doi":"10.1068/b36017","title":"Lock-in and its Influence on the Project Performance of Large-Scale Transportation Infrastructure Projects: Investigating the Way in Which Lock-in Can Emerge and Affect Cost Overruns","year":2010,"lang":"en","type":"article","venue":"Environment and Planning B Planning and Design","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Lock (firearm); Sunk costs; Process (computing); Scale (ratio); Closure (psychology); Cost overrun; Risk analysis (engineering); Constructability; Engineering; Operations management; Business; Computer science; Economics; Construction engineering; Construction industry; Microeconomics; Systems engineering","score_opus":0.04783642149432625,"score_gpt":0.29792211772776706,"score_spread":0.2500856962334408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2149475851","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.993156,0.00012517985,0.0009784462,0.0002665262,0.0000063705393,0.000033934164,0.000040176288,0.000010923656,0.0053824177],"genre_scores_gemma":[0.999398,0.000038506303,0.00017626873,0.000013520399,0.0000026517707,0.000011051058,0.000019180568,0.000007466546,0.0003333767],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98308474,0.009607121,0.001005389,0.0011005689,0.0028896034,0.0023125105],"domain_scores_gemma":[0.85886735,0.090261884,0.029737288,0.0044874293,0.010054054,0.006591912],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012741025,0.00043822415,0.0006696989,0.0016288606,0.0011321941,0.0049094176,0.0010207512,0.0014352178,0.0034145163],"category_scores_gemma":[0.07051551,0.00039326993,0.00076893164,0.0017760813,0.003707156,0.0030591702,0.003898852,0.002226567,0.00042186896],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009217709,0.0015700993,0.89482695,0.00031452696,0.0005636792,0.001283415,0.017437756,0.02708132,0.0035204599,0.009516003,0.00082896854,0.042135168],"study_design_scores_gemma":[0.000035682948,0.0010669803,0.9511163,0.00017639165,0.00012364287,0.00016246969,0.01961417,0.018099543,0.0014011114,0.0049595754,0.0031371168,0.00010699277],"about_ca_topic_score_codex":0.012292459,"about_ca_topic_score_gemma":0.012554115,"teacher_disagreement_score":0.012741025,"about_ca_system_score_codex":0.0044945506,"about_ca_system_score_gemma":0.0022183245,"threshold_uncertainty_score":0.0673818},"labels":[],"label_agreement":null},{"id":"W2149668426","doi":"10.1139/cjce-2014-0029","title":"Calculating cumulative inefficiency using earned value management in construction projects","year":2015,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Damages; Production (economics); Inefficiency; Productivity; Work (physics); Ripple; Operations research; Computer science; Econometrics; Engineering; Mathematics; Economics","score_opus":0.11093348922516108,"score_gpt":0.3272764455415061,"score_spread":0.216342956316345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2149668426","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2390608,0.0011387658,0.7463781,0.00016763312,0.000052163305,0.00033438235,0.0003654909,0.00034478464,0.012157869],"genre_scores_gemma":[0.8923812,0.00046299628,0.10463377,0.000022484222,0.000013480341,0.00018180803,0.0002693745,0.000044911507,0.0019899337],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9966234,0.00078592,0.0002193668,0.00035630033,0.001768992,0.00024599052],"domain_scores_gemma":[0.9952408,0.0025011005,0.00082485017,0.00028201533,0.0010097345,0.00014150348],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003359641,0.0009363577,0.00084324833,0.0056787296,0.00044924926,0.0023697296,0.0011262938,0.0007472806,0.0013153676],"category_scores_gemma":[0.0113671515,0.0004708468,0.00096007384,0.004218237,0.0008081251,0.001962867,0.0012770005,0.0008161833,0.00022821121],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009965657,0.00012218567,0.029484585,0.00030001983,0.000110888,0.00036863692,0.00030278368,0.74297607,0.002353961,0.016779419,0.00064451154,0.20645727],"study_design_scores_gemma":[0.000010804652,0.00018115566,0.01857357,0.00010279511,0.0000528994,0.00019141243,0.00025312192,0.9606382,0.004302763,0.013226081,0.0023977596,0.00006945906],"about_ca_topic_score_codex":0.006817895,"about_ca_topic_score_gemma":0.007007195,"teacher_disagreement_score":0.006817895,"about_ca_system_score_codex":0.0029753381,"about_ca_system_score_gemma":0.0016876262,"threshold_uncertainty_score":0.02158773},"labels":[],"label_agreement":null},{"id":"W2149930017","doi":"10.14288/1.0048556","title":"Strategic roadmaps for construction innovation : assessing the state of research","year":2011,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Scope (computer science); Strategic planning; Process (computing); Process management; Scale (ratio); Business; Knowledge management; Engineering; Marketing; Computer science","score_opus":0.20431882992299896,"score_gpt":0.3471555967164014,"score_spread":0.14283676679340243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2149930017","genre_codex":"empirical","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5835273,0.023065846,0.08674453,0.048645597,0.00063195714,0.0050173164,0.0067090145,0.0013298647,0.2443286],"genre_scores_gemma":[0.91280884,0.005251128,0.075804174,0.00032998173,0.00003245009,0.00092151726,0.0017295168,0.00009541188,0.0030270491],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9503249,0.011962778,0.003951919,0.0026700485,0.02664746,0.0044428995],"domain_scores_gemma":[0.839255,0.05054158,0.0112094125,0.0068002925,0.083592676,0.00860111],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.06649683,0.0009178144,0.0008421338,0.041167237,0.012240751,0.022659974,0.0038482023,0.0016930624,0.003450958],"category_scores_gemma":[0.120873205,0.0010656756,0.0010841732,0.049439024,0.011290059,0.0133397,0.01029893,0.003051455,0.0004683294],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023288539,0.00013021835,0.104762666,0.004870376,0.00017936678,0.00052878016,0.12505853,0.008711419,0.0013443647,0.26745188,0.021414036,0.46531555],"study_design_scores_gemma":[0.00004662961,0.00037719216,0.18110275,0.004877423,0.00024727016,0.00041760365,0.44279468,0.02217057,0.002266235,0.099121645,0.24608576,0.00049229903],"about_ca_topic_score_codex":0.6349717,"about_ca_topic_score_gemma":0.72733647,"teacher_disagreement_score":0.6349717,"about_ca_system_score_codex":0.094972976,"about_ca_system_score_gemma":0.21373034,"threshold_uncertainty_score":0.73435605},"labels":[],"label_agreement":null},{"id":"W2151164841","doi":"10.1061/41109(373)20","title":"Identifying Competencies for Baccalaureate Level Construction Education: Enhancing Employability of Young Professionals in the Construction Industry","year":2010,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"SAIT Polytechnic","funders":"","keywords":"Employability; Procurement; Construction industry; Competence (human resources); Construction management; Syllabus; Core competency; Project management; Teamwork; Engineering; Knowledge management; Engineering management; Business; Management; Pedagogy; Computer science; Psychology; Construction engineering; Marketing","score_opus":0.14254488794905115,"score_gpt":0.42037139888525665,"score_spread":0.2778265109362055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151164841","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99606067,0.00007303023,0.00032427663,0.0002406657,0.0000055513788,0.000055528857,0.00001691436,0.0000069635007,0.003216453],"genre_scores_gemma":[0.9968479,0.0001460362,0.0014013627,0.00006618384,0.0000028921154,0.00003406931,0.000058780206,0.0000014891607,0.0014412996],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9991755,0.00012228102,0.000034372864,0.000029156352,0.00033065066,0.00030802574],"domain_scores_gemma":[0.99575424,0.0005457651,0.00036768892,0.00006393547,0.0010752385,0.0021931697],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021756948,0.0001447457,0.00011523945,0.0011648184,0.0012597392,0.0013418607,0.0004571562,0.00038337582,0.0017377777],"category_scores_gemma":[0.005671683,0.00015949087,0.0001164165,0.00065955485,0.0005001442,0.00047544378,0.0010576351,0.00041726526,0.00034494148],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008850452,0.0013341703,0.77005625,0.0002551923,0.000008119645,0.0005050903,0.043216422,0.00038472287,0.0051939967,0.0013386298,0.0031958066,0.17442304],"study_design_scores_gemma":[0.000012378263,0.00029265808,0.9551386,0.00017807428,0.000006945742,0.00018036505,0.034434736,0.0008153701,0.0015668228,0.00036037472,0.0069978726,0.000015631855],"about_ca_topic_score_codex":0.13645044,"about_ca_topic_score_gemma":0.35811555,"teacher_disagreement_score":0.13645044,"about_ca_system_score_codex":0.00409651,"about_ca_system_score_gemma":0.018936878,"threshold_uncertainty_score":0.27131242},"labels":[],"label_agreement":null},{"id":"W2152277790","doi":"","title":"APPLICATION OF AN INFORMATION AND KNOWLEDGE MANAGEMENT METHODOLOGY IN ANALYZING THE RISKS IN CONSTRUCTION PROJECTS","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Risk management; Risk analysis (engineering); Project management; Construction management; Multitude; Body of knowledge; Information system; Knowledge management; Computer science; Engineering management; Engineering; Business; Systems engineering","score_opus":0.05562467889231695,"score_gpt":0.33096316731111025,"score_spread":0.27533848841879327,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152277790","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09074242,0.0005405063,0.87291485,0.0034604068,0.0000698774,0.0020722097,0.00041266595,0.000584808,0.029202225],"genre_scores_gemma":[0.23360518,0.00042534282,0.7630037,0.0001316653,0.000026650789,0.0008686712,0.00026229236,0.000025459818,0.0016510279],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9903598,0.004662072,0.0010590096,0.0008617677,0.0027225853,0.00033479062],"domain_scores_gemma":[0.9759477,0.015607716,0.0025457852,0.0017019407,0.0036949222,0.0005020139],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012868162,0.0009781147,0.000736404,0.013967475,0.0024270364,0.0071695056,0.001969163,0.0017589914,0.002022218],"category_scores_gemma":[0.021864032,0.0005129432,0.0012835988,0.009598389,0.002380889,0.0071333745,0.0025803777,0.0013472879,0.00038992823],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016355075,0.0009906945,0.031573847,0.0012809234,0.00025905177,0.0011309771,0.02594227,0.021272015,0.0051156697,0.101349734,0.0028212678,0.8081],"study_design_scores_gemma":[0.00026226288,0.001574595,0.06088372,0.0036969637,0.00088302646,0.003159323,0.07309998,0.42725328,0.02485567,0.28322697,0.12054773,0.0005564745],"about_ca_topic_score_codex":0.006007236,"about_ca_topic_score_gemma":0.007315579,"teacher_disagreement_score":0.013967475,"about_ca_system_score_codex":0.0035483558,"about_ca_system_score_gemma":0.0070080278,"threshold_uncertainty_score":0.0680542},"labels":[],"label_agreement":null},{"id":"W2152723904","doi":"10.1123/jsep.2014-0276","title":"Appraisal in a Team Context: Perceptions of Cohesion Predict Competition Importance and Prospects for Coping","year":2015,"lang":"en","type":"article","venue":"Journal of Sport and Exercise Psychology","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Wilfrid Laurier University","funders":"Universität zu Köln; Deutscher Akademischer Austauschdienst; Deutsche Sporthochschule Köln; Wilfrid Laurier University","keywords":"Psychology; Cohesion (chemistry); Perception; Coping (psychology); Competition (biology); Applied psychology; Social psychology; Psychotherapist; Chemistry; Ecology","score_opus":0.06187189112992997,"score_gpt":0.3937696271994047,"score_spread":0.33189773606947476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152723904","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99941754,0.000029748626,0.00003952182,0.000023810615,0.0000018350253,0.0000037779785,0.000008915715,4.2302375e-7,0.00047446182],"genre_scores_gemma":[0.9997316,0.000028064203,0.000057567147,0.000007521784,0.000003573084,0.000004534562,0.00002285471,4.6977138e-7,0.00014377212],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99974805,0.00008243284,0.000018326631,0.000033222703,0.000059058635,0.000058771806],"domain_scores_gemma":[0.99851567,0.00021382711,0.00061381585,0.000042981013,0.00010137611,0.0005122704],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049081317,0.00023314274,0.0001741148,0.00039494855,0.00040783623,0.00081183034,0.00013062748,0.00037520693,0.002362446],"category_scores_gemma":[0.0021276604,0.00016521598,0.00017007581,0.00020044377,0.00034704508,0.0002490007,0.00066870905,0.0004365066,0.00020671418],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009041067,0.00016674947,0.9926595,0.000018368622,0.000041671192,0.00006835408,0.001973355,0.00009704988,0.0013051776,0.00006286584,0.0001045755,0.00341186],"study_design_scores_gemma":[0.0000030622705,0.000071011375,0.9984144,0.0000055282276,0.0000053925137,0.000034928744,0.0011473068,0.00014293891,0.000054559154,0.00004033135,0.00007778803,0.000002648961],"about_ca_topic_score_codex":0.0025915315,"about_ca_topic_score_gemma":0.005244356,"teacher_disagreement_score":0.0025915315,"about_ca_system_score_codex":0.00019316141,"about_ca_system_score_gemma":0.0002122993,"threshold_uncertainty_score":0.007903218},"labels":[],"label_agreement":null},{"id":"W2153012093","doi":"10.5267/j.msl.2013.06.045","title":"Investigating different challenges in construction projects","year":2013,"lang":"en","type":"article","venue":"Management Science Letters","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Process management; Computer science; Business; Knowledge management; Operations management; Engineering","score_opus":0.12644478338683218,"score_gpt":0.3227404958133296,"score_spread":0.1962957124264974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153012093","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.990013,0.00015452468,0.0026956121,0.0005076105,0.000016116279,0.00008068314,0.000031004653,0.000005471952,0.006495933],"genre_scores_gemma":[0.9971169,0.00016932096,0.0018456322,0.000033779812,0.00000861803,0.00004727006,0.000030157635,0.000003636808,0.0007445406],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9907086,0.004666595,0.0005272978,0.0007501381,0.0023817318,0.00096563966],"domain_scores_gemma":[0.9638771,0.019665906,0.009168958,0.00077737577,0.004107254,0.0024035128],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006393865,0.0003984958,0.00034366266,0.0014424463,0.0016012676,0.0046322457,0.00063946046,0.0009540216,0.0022313453],"category_scores_gemma":[0.035756472,0.00027322056,0.00045588525,0.0015609337,0.0014017399,0.0030753054,0.0020937088,0.0010125908,0.00024396424],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042450434,0.0011139762,0.7059713,0.0011709494,0.00019714137,0.0027192214,0.13475932,0.008171244,0.0069902185,0.01976924,0.002093921,0.116618924],"study_design_scores_gemma":[0.00003285824,0.00092054356,0.5778269,0.00033874207,0.00009197279,0.0011347749,0.3664577,0.012144749,0.0031460482,0.010451603,0.027320879,0.0001332768],"about_ca_topic_score_codex":0.0020023268,"about_ca_topic_score_gemma":0.0025044815,"teacher_disagreement_score":0.006393865,"about_ca_system_score_codex":0.0024246224,"about_ca_system_score_gemma":0.0028364721,"threshold_uncertainty_score":0.03381437},"labels":[],"label_agreement":null},{"id":"W2155725072","doi":"10.1002/pmj.21281","title":"Project Management for Development in Africa: Why Projects are Failing and What Can be Done about It","year":2012,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":248,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Project management; Extreme project management; Program management; Accountability; Project management triangle; OPM3; Business; Project charter; Process management; Engineering management; Political science; Environmental resource management; Engineering; Economics; Systems engineering","score_opus":0.16685611070251144,"score_gpt":0.36561296133710847,"score_spread":0.19875685063459703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2155725072","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1490792,0.10852877,0.013870892,0.6642384,0.001743755,0.0002236711,0.00014981779,0.00017449915,0.06199104],"genre_scores_gemma":[0.9181135,0.05117425,0.014462821,0.010669978,0.00036817865,0.00023114521,0.00006516175,0.00007528686,0.0048396587],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9739683,0.016957333,0.0012391062,0.0007872919,0.0034764751,0.003571467],"domain_scores_gemma":[0.9626606,0.019655913,0.0063978364,0.0012481613,0.0057458854,0.004291551],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.023090417,0.00077250693,0.0007327484,0.0024670803,0.009486268,0.013264261,0.0016880698,0.0039559295,0.004905194],"category_scores_gemma":[0.06287246,0.00052069663,0.0003807342,0.0049879723,0.013184792,0.0117200315,0.0074766944,0.0042715003,0.00069987454],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010993783,0.00021743643,0.05323307,0.006278243,0.00009481092,0.0022836777,0.13212202,0.0017994982,0.0012108221,0.20206653,0.06295213,0.5376318],"study_design_scores_gemma":[0.000041326817,0.00028373796,0.036840867,0.013966219,0.00006471119,0.0019611889,0.39054,0.0014583003,0.000823274,0.114272356,0.43960473,0.00014328258],"about_ca_topic_score_codex":0.008915364,"about_ca_topic_score_gemma":0.009386239,"teacher_disagreement_score":0.023090417,"about_ca_system_score_codex":0.0060129478,"about_ca_system_score_gemma":0.024951585,"threshold_uncertainty_score":0.122115254},"labels":[],"label_agreement":null},{"id":"W2156488159","doi":"10.1139/l05-125","title":"Workforce training initiatives for megaproject success","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Workforce; Apprenticeship; Training (meteorology); Productivity; Business; Megaproject; Workforce planning; Workforce development; Engineering; Economic growth; Operations management; Economics","score_opus":0.06851505673184963,"score_gpt":0.3052257756425072,"score_spread":0.23671071891065756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156488159","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40569898,0.008820403,0.0054269037,0.11287321,0.001271166,0.00050341105,0.0003588848,0.0005232271,0.46452388],"genre_scores_gemma":[0.9295078,0.003480369,0.0049203834,0.0034949004,0.00019952931,0.00020056906,0.00022404605,0.00005232805,0.057920083],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9985245,0.0003102157,0.000021062882,0.000059467984,0.00037348567,0.0007112206],"domain_scores_gemma":[0.9938776,0.0003460052,0.00026346924,0.00007885134,0.0006377315,0.0047962926],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023158654,0.00021801621,0.00012404188,0.0008997914,0.0038634534,0.0028862897,0.00089265767,0.00095226074,0.024995096],"category_scores_gemma":[0.0035222853,0.0001195963,0.00012605835,0.0008210443,0.0011453605,0.0008554359,0.005091237,0.0012392281,0.0012169848],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009316854,0.00075946754,0.066518076,0.0007763627,0.000019272511,0.0010615537,0.01320205,0.00081438344,0.0021668484,0.06690256,0.17896228,0.668724],"study_design_scores_gemma":[0.00004293207,0.0003835752,0.22679472,0.0012744248,0.000016960857,0.00055483304,0.03459195,0.00080720615,0.00080324983,0.01054569,0.7241477,0.00003669227],"about_ca_topic_score_codex":0.036775548,"about_ca_topic_score_gemma":0.14806198,"teacher_disagreement_score":0.9632245,"about_ca_system_score_codex":0.005421176,"about_ca_system_score_gemma":0.03216344,"threshold_uncertainty_score":0.08361691},"labels":[],"label_agreement":null},{"id":"W2157111453","doi":"10.1002/pmj.20059","title":"Governance and Support in the Sponsoring of Projects and Programs","year":2008,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":129,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Corporate governance; Accountability; Project governance; Competence (human resources); Project sponsorship; Business; Public relations; Context (archaeology); Project management; Transparency (behavior); Critical success factor; Process management; Project management triangle; Project charter; Political science; Engineering; Management","score_opus":0.124178346076639,"score_gpt":0.3487886617071788,"score_spread":0.22461031563053982,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157111453","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5350502,0.0053781983,0.06704479,0.045276135,0.0010590431,0.00092633214,0.00012648142,0.00041501035,0.34472376],"genre_scores_gemma":[0.98154587,0.0012075602,0.00574784,0.0006643057,0.00025133585,0.00025068375,0.000050975606,0.000047235688,0.010234107],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.95653737,0.032032102,0.0016869729,0.0019050372,0.0050112153,0.0028273284],"domain_scores_gemma":[0.934223,0.027489083,0.010448102,0.0040921173,0.0064798365,0.017267795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.027103646,0.00022316154,0.00028047987,0.0017356697,0.003719146,0.0073074424,0.0011431038,0.0014964823,0.004398114],"category_scores_gemma":[0.06000178,0.0003331819,0.00020354416,0.0019227326,0.0071610287,0.003624722,0.007427683,0.0022531054,0.0005908515],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017262787,0.0008933241,0.11074324,0.0008778656,0.00009868126,0.0015705354,0.055666614,0.0047904905,0.0021827235,0.37333003,0.02496066,0.42471322],"study_design_scores_gemma":[0.00024032197,0.0012198605,0.16781797,0.0020068137,0.00007908239,0.0015820666,0.048323985,0.0044803103,0.0018702904,0.15572365,0.61651146,0.00014420782],"about_ca_topic_score_codex":0.0030095004,"about_ca_topic_score_gemma":0.00465589,"teacher_disagreement_score":0.027103646,"about_ca_system_score_codex":0.0034073617,"about_ca_system_score_gemma":0.015460635,"threshold_uncertainty_score":0.14333951},"labels":[],"label_agreement":null},{"id":"W2157987363","doi":"10.1007/978-3-642-41501-2_64","title":"Systems Engineering as a First Step to Effective Use of BIM","year":2013,"lang":"en","type":"book-chapter","venue":"IFIP advances in information and communication technology","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Engineering management; Field (mathematics); Engineering; Order (exchange); Systems engineering; Computer science; Risk analysis (engineering); Management science; Construction engineering; Business","score_opus":0.023115962439076095,"score_gpt":0.29325160180701815,"score_spread":0.27013563936794205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157987363","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0039462564,0.025860762,0.35586795,0.019109763,0.0024177267,0.0001865091,0.00019511236,0.0006634202,0.5917525],"genre_scores_gemma":[0.09359463,0.045871116,0.63474524,0.0035924031,0.0011620038,0.00028816934,0.0005111084,0.0005326006,0.21970268],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9986903,0.00040563647,0.00006355075,0.00006379899,0.00072312314,0.00005351734],"domain_scores_gemma":[0.9989625,0.0005562643,0.00003483037,0.00013603558,0.00026558532,0.000044873934],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002696284,0.0006625699,0.00039996253,0.001691853,0.000934479,0.006370304,0.0009652522,0.001435472,0.012948208],"category_scores_gemma":[0.0025566954,0.00042087398,0.0004330887,0.0019392614,0.001770952,0.0052775457,0.002669906,0.002609321,0.0036726696],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000064285164,0.00004273322,0.00015732725,0.00038216982,0.000010461126,0.00006077874,0.00055334903,0.0027769129,0.0014051602,0.73249924,0.030726224,0.2313792],"study_design_scores_gemma":[0.000003489402,0.000032630298,0.00023828832,0.0004100818,0.0000068141926,0.00020646694,0.00030820264,0.0035645945,0.0016119182,0.23167053,0.7619336,0.000013410477],"about_ca_topic_score_codex":0.001754373,"about_ca_topic_score_gemma":0.0025926495,"teacher_disagreement_score":0.012948208,"about_ca_system_score_codex":0.0014591007,"about_ca_system_score_gemma":0.0025573107,"threshold_uncertainty_score":0.043316066},"labels":[],"label_agreement":null},{"id":"W2160296800","doi":"10.3141/1813-33","title":"Quality Management System for a Highway Megaproject","year":2002,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"U.S. Army Medical Research and Development Command","keywords":"Megaproject; Integrated project delivery; Construction management; Interoperability; Quality (philosophy); Project management; Process management; General partnership; Information management; Quality management; Engineering management; Engineering; Quality assurance; Quality policy; Information system; Data management; Knowledge management; Management system; Computer science; Systems engineering; Business; Operations management; Civil engineering","score_opus":0.34532567790214624,"score_gpt":0.47769684955136194,"score_spread":0.1323711716492157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2160296800","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058037434,0.00046527584,0.657013,0.0025725511,0.00031459838,0.005716001,0.01301976,0.20850311,0.05435827],"genre_scores_gemma":[0.36607727,0.00068826054,0.55044705,0.000840246,0.00027645103,0.003710128,0.03644965,0.003321341,0.038189482],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9959928,0.0008684588,0.0008287311,0.0007403922,0.0013449542,0.0002246172],"domain_scores_gemma":[0.98639166,0.0025863417,0.0019812505,0.002867039,0.0053315638,0.0008421984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010301657,0.00052325125,0.00061864615,0.0054522813,0.0013017128,0.003430626,0.0014207413,0.00089317287,0.019463917],"category_scores_gemma":[0.012987876,0.0004382962,0.00042744927,0.0036904241,0.00046989162,0.0024577102,0.0019392862,0.0008864069,0.0072619286],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011869818,0.0011172078,0.040872037,0.0008503225,0.00011641916,0.00079857523,0.0024539565,0.015959539,0.014091793,0.019574987,0.1256526,0.7773257],"study_design_scores_gemma":[0.001061533,0.0017100665,0.06276225,0.0007431318,0.00028870444,0.0009977354,0.0010442366,0.1927848,0.03624795,0.012224895,0.6896276,0.00050714123],"about_ca_topic_score_codex":0.0064921435,"about_ca_topic_score_gemma":0.0032770701,"teacher_disagreement_score":0.019463917,"about_ca_system_score_codex":0.0025679132,"about_ca_system_score_gemma":0.004531034,"threshold_uncertainty_score":0.065113306},"labels":[],"label_agreement":null},{"id":"W2165976108","doi":"10.3968/j.css.1923669720100603.017","title":"Auditees' Perception on Accountability Index: A Study in a Malaysian Public University LA PERCEPTION DES AUDITEURS DE L'INDICE DE LA RESPONSABILISATION: UNE ÉTUDE DANS UNE UNIVERSITÉ PUBLIQUE MALAISIENNE","year":2010,"lang":"fr","type":"article","venue":"Canadian social science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Audit; Political science; Accountability; Perception; Index (typography); Psychology; Public relations; Business; Business administration; Welfare economics; Accounting; Economics; Computer science","score_opus":0.02567338699109283,"score_gpt":0.30990503590109075,"score_spread":0.2842316489099979,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2165976108","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99957556,0.00004380068,0.00004181503,0.00009160039,0.0000033146894,0.000004609721,0.000011431507,0.0000011692607,0.00022660314],"genre_scores_gemma":[0.9992692,0.00010695928,0.00004543377,0.000050473274,0.0000043763857,0.000005804274,0.000010462002,0.0000010446045,0.0005062443],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9978137,0.0006306538,0.00020400247,0.00014618048,0.0007734282,0.000432078],"domain_scores_gemma":[0.9920209,0.0016091907,0.002711276,0.0002351832,0.0019580682,0.0014653672],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030906717,0.00021474661,0.00032491997,0.00094359857,0.0016218007,0.0020752766,0.0002700746,0.00043575975,0.0020320727],"category_scores_gemma":[0.0063688336,0.00032500268,0.00036061511,0.0009715719,0.000846023,0.0008294078,0.0010660569,0.0008654366,0.00031148532],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016366472,0.00026507984,0.8932477,0.00008228205,0.000024723347,0.0004120558,0.08630404,0.00006130962,0.0029111186,0.0001418391,0.0005783449,0.015807822],"study_design_scores_gemma":[0.000006869283,0.00061758934,0.8244065,0.00006274708,0.000020326672,0.00044655308,0.17066863,0.00027902608,0.0007221659,0.00005229113,0.0026742716,0.000043012195],"about_ca_topic_score_codex":0.019098016,"about_ca_topic_score_gemma":0.017635101,"teacher_disagreement_score":0.019098016,"about_ca_system_score_codex":0.0015777631,"about_ca_system_score_gemma":0.0015211978,"threshold_uncertainty_score":0.037973702},"labels":[],"label_agreement":null},{"id":"W2166111345","doi":"10.12821/ijispm010301","title":"Project characteristics, project management software utilization and project performance: An impact analysis based on real project data","year":2022,"lang":"en","type":"article","venue":"International journal of information systems and project management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal; Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Software project management; Project management triangle; Project management; Project planning; Extreme project management; Project manager; Computer science; Work breakdown structure; Project portfolio management; Earned value management; Software; Engineering management; Systems engineering; OPM3; Process management; Software engineering; Software development; Engineering; Software construction; Operating system","score_opus":0.14373680442361203,"score_gpt":0.4157924978481894,"score_spread":0.27205569342457736,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166111345","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9987275,0.000022976948,0.00059355836,0.000006904822,7.574352e-7,0.00002543622,0.00026213148,0.000004939334,0.00035585632],"genre_scores_gemma":[0.99856097,0.000027882621,0.0005165202,0.0000020776058,0.000002228684,0.00006105256,0.000670748,0.0000043027444,0.00015413402],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99451315,0.0029431747,0.00042862305,0.0003617811,0.0014263216,0.00032694987],"domain_scores_gemma":[0.9473165,0.04009424,0.006015259,0.0015946954,0.0036488078,0.0013304523],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004823572,0.0004080867,0.00043491542,0.0038713322,0.00034069899,0.0009399726,0.00045538033,0.00043817481,0.0018931573],"category_scores_gemma":[0.018947877,0.00021785391,0.00067389535,0.0043360265,0.00076667446,0.0012390775,0.0009612422,0.0005893422,0.0003790449],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065567414,0.00068688736,0.9757102,0.000116694704,0.0001688294,0.00019461502,0.0008541049,0.0071545895,0.0010179507,0.00020881156,0.00018016034,0.013051489],"study_design_scores_gemma":[0.000011951092,0.0013577504,0.9878864,0.00001647242,0.00004726947,0.00015434987,0.0011714525,0.008129852,0.000776849,0.000086016444,0.0003395799,0.000022112032],"about_ca_topic_score_codex":0.0020887991,"about_ca_topic_score_gemma":0.001447981,"teacher_disagreement_score":0.004823572,"about_ca_system_score_codex":0.00068767875,"about_ca_system_score_gemma":0.0005268611,"threshold_uncertainty_score":0.025509775},"labels":[],"label_agreement":null},{"id":"W2166714529","doi":"","title":"Adapting a technology firm to changing demands by portfolio implementation","year":2011,"lang":"en","type":"article","venue":"Portland International Conference on Management of Engineering and Technology","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Obsolescence; Organizational change; Knowledge management; Process management; Change management (ITSM); Business; Portfolio; Project portfolio management; Exploratory research; Computer science; Risk analysis (engineering); Marketing; Project management; Engineering; Lean manufacturing; Public relations; Systems engineering","score_opus":0.06902993741708752,"score_gpt":0.3392211261278324,"score_spread":0.2701911887107449,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166714529","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9311424,0.000088418186,0.015717238,0.0016826488,0.000038667105,0.00025195687,0.0000350144,0.00013387902,0.050909888],"genre_scores_gemma":[0.98242885,0.00011211622,0.011363314,0.00019291657,0.000016769074,0.00008203302,0.000050116523,0.00004101023,0.0057129893],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99500024,0.0025338298,0.00025209913,0.0004464604,0.00076218654,0.001005191],"domain_scores_gemma":[0.995814,0.0011336196,0.00059170724,0.0009434782,0.0005980048,0.00091916666],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004773847,0.00038468977,0.00021663719,0.0008809718,0.0018598888,0.0076776356,0.001154786,0.0017253098,0.004788697],"category_scores_gemma":[0.0143731525,0.00039743033,0.00047766758,0.0011745666,0.0013706236,0.0041954312,0.0041326056,0.0014067474,0.0012926414],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005419018,0.003346089,0.19097713,0.0003515789,0.00015120428,0.0039937543,0.027173702,0.017316218,0.035841648,0.062240396,0.008336088,0.64973027],"study_design_scores_gemma":[0.00031734756,0.008315549,0.37533435,0.00073405425,0.00027364388,0.004847219,0.15323219,0.081731446,0.023170574,0.08765104,0.2639388,0.00045380383],"about_ca_topic_score_codex":0.001658805,"about_ca_topic_score_gemma":0.00294329,"teacher_disagreement_score":0.0076776356,"about_ca_system_score_codex":0.0019494393,"about_ca_system_score_gemma":0.0030098225,"threshold_uncertainty_score":0.025246799},"labels":[],"label_agreement":null},{"id":"W2167043054","doi":"10.1002/kpm.207","title":"How middle managers integrate knowledge within projects","year":2004,"lang":"en","type":"article","venue":"Knowledge and Process Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University; University of New Brunswick","funders":"","keywords":"Middle management; Knowledge management; Process (computing); Business; Middle level; Qualitative research; Process management; Computer science; Sociology; Engineering","score_opus":0.09932839794514935,"score_gpt":0.3491797377617002,"score_spread":0.24985133981655083,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167043054","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96601284,0.00034826488,0.010920269,0.0025116885,0.00004147939,0.00007245831,0.000010650361,0.00006593819,0.020016424],"genre_scores_gemma":[0.9957361,0.00012073031,0.0020885628,0.00017238838,0.000010885632,0.000027531287,0.000011462222,0.000012719567,0.0018195873],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.98635095,0.008611025,0.00038252812,0.00064307416,0.0022088573,0.0018035528],"domain_scores_gemma":[0.9875079,0.006691712,0.001438899,0.00090516964,0.0013625163,0.002093893],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012652601,0.00034086048,0.00027458867,0.0025901243,0.0036895704,0.010597838,0.0009828836,0.0017606122,0.0033366438],"category_scores_gemma":[0.037597623,0.00040658336,0.00029275563,0.0011084545,0.0034745056,0.008776632,0.0049941507,0.0015569659,0.00065647135],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015597831,0.00041917802,0.046230983,0.00019200156,0.000049362727,0.0015673162,0.76695275,0.0006845782,0.0058595017,0.022267241,0.0034195238,0.15220156],"study_design_scores_gemma":[0.00006037311,0.0005839198,0.030609543,0.0005650862,0.00007811654,0.0012312656,0.8402066,0.0035900727,0.0029900258,0.030032339,0.089932024,0.00012060288],"about_ca_topic_score_codex":0.0018702167,"about_ca_topic_score_gemma":0.0018133051,"teacher_disagreement_score":0.012652601,"about_ca_system_score_codex":0.002242501,"about_ca_system_score_gemma":0.0040306337,"threshold_uncertainty_score":0.0669142},"labels":[],"label_agreement":null},{"id":"W2168125351","doi":"10.1139/l05-032","title":"Early warning signs for distressed projects","year":2005,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bidding; Procurement; Outcome (game theory); Logistic regression; Warning system; Operations management; Business; Project management; Change order; Process (computing); Risk analysis (engineering); Actuarial science; Process management; Computer science; Marketing; Project planning; Engineering; Project charter; Economics; Systems engineering; Microeconomics","score_opus":0.0488635076339145,"score_gpt":0.2796504380814073,"score_spread":0.23078693044749282,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168125351","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96902376,0.0009161193,0.024303563,0.00093461276,0.00005458207,0.00021658833,0.00024663884,0.00016624245,0.0041379165],"genre_scores_gemma":[0.99442416,0.00023514153,0.004768408,0.000018560424,0.000014132232,0.000037614107,0.00007933382,0.000005346677,0.00041730603],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99709284,0.0016747352,0.00021853883,0.000089033914,0.0007252167,0.00019960318],"domain_scores_gemma":[0.95737,0.020307308,0.015542246,0.00085373555,0.0048371106,0.0010896621],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032646765,0.00034787902,0.00029032715,0.002599109,0.00039625267,0.0008052702,0.0004254863,0.0005925487,0.003018463],"category_scores_gemma":[0.041555565,0.0001804296,0.00018616398,0.001053061,0.00042726676,0.0013532161,0.00087912567,0.0007199559,0.00038474222],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018742948,0.00035435127,0.6838021,0.0011419874,0.000047857957,0.0024139264,0.0027925526,0.011245421,0.006994677,0.003452541,0.006183988,0.27969626],"study_design_scores_gemma":[0.00011101777,0.0016894053,0.9191374,0.0007381423,0.00012803011,0.003820646,0.0076075788,0.040928144,0.00861971,0.0060993545,0.010952496,0.00016812669],"about_ca_topic_score_codex":0.00087483105,"about_ca_topic_score_gemma":0.0016624397,"teacher_disagreement_score":0.0032646765,"about_ca_system_score_codex":0.00038246962,"about_ca_system_score_gemma":0.0007358151,"threshold_uncertainty_score":0.017265499},"labels":[],"label_agreement":null},{"id":"W2168513314","doi":"10.1061/40754(183)31","title":"State-of-the-Art Review of Construction Performance Models and Factors","year":2005,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Schema (genetic algorithms); Computer science; Scope (computer science); Project management; Management science; Knowledge management; Data science; Engineering; Systems engineering; Information retrieval","score_opus":0.0817830568594166,"score_gpt":0.333809579958904,"score_spread":0.25202652309948737,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168513314","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038662937,0.89771175,0.035046317,0.0038763874,0.00035057162,0.00028224764,0.0012748819,0.00028546687,0.022509474],"genre_scores_gemma":[0.18089873,0.78588516,0.028821034,0.0004820947,0.0003321871,0.00039297773,0.0016521062,0.000076501165,0.0014591387],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9888849,0.0042427434,0.0018000078,0.0009837418,0.0038653316,0.00022330366],"domain_scores_gemma":[0.90379876,0.08231309,0.00483787,0.0014777066,0.007299638,0.0002728655],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017694902,0.0018348737,0.0025561654,0.018497396,0.0007748267,0.0073900926,0.002282396,0.0012573933,0.0037408576],"category_scores_gemma":[0.054546356,0.0008632212,0.0018522756,0.022805557,0.0014743817,0.004876521,0.0011405363,0.00082426023,0.0010739962],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022187083,0.00022785869,0.030556407,0.07028196,0.0015084769,0.00038356942,0.0021917087,0.010855743,0.0006876011,0.01930601,0.015702507,0.84807634],"study_design_scores_gemma":[0.00010385796,0.0010570491,0.13815242,0.13589402,0.0107522365,0.0024361624,0.010996458,0.03874839,0.004431298,0.05127404,0.6055891,0.00056489615],"about_ca_topic_score_codex":0.009642783,"about_ca_topic_score_gemma":0.011567889,"teacher_disagreement_score":0.018497396,"about_ca_system_score_codex":0.0036717763,"about_ca_system_score_gemma":0.008269056,"threshold_uncertainty_score":0.09358072},"labels":[],"label_agreement":null},{"id":"W2168843589","doi":"10.4236/ti.2015.61005","title":"Risk Management in Project Networks: An Information Processing View","year":2015,"lang":"en","type":"article","venue":"Technology and Investment","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Project risk management; Risk management; Knowledge management; Project management; Risk management plan; Project management triangle; Computer science; Risk management information systems; Business; Plan (archaeology); Information system; Process management; Risk analysis (engineering); IT risk management; Management information systems; Management; Finance","score_opus":0.07124988984886416,"score_gpt":0.35197291905412725,"score_spread":0.2807230292052631,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168843589","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.091817215,0.004195544,0.794049,0.019787513,0.0001660421,0.0005012535,0.00035559558,0.0002653044,0.08886252],"genre_scores_gemma":[0.8556659,0.004531056,0.13378835,0.0007372696,0.00042245648,0.00037975353,0.00027222917,0.00007040052,0.0041325316],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9901591,0.004869178,0.0007802941,0.0009609212,0.0025189777,0.00071150437],"domain_scores_gemma":[0.96194965,0.028046029,0.0042671147,0.002533201,0.0025975027,0.0006065296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012978662,0.0010371953,0.00083324104,0.008155744,0.002323558,0.016519908,0.0022162274,0.0023973044,0.0035256913],"category_scores_gemma":[0.026943238,0.0007481927,0.001447566,0.0061847577,0.011513081,0.020971006,0.0032358663,0.0023906413,0.00049226213],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009446408,0.00019980564,0.008025217,0.00048573318,0.00011819389,0.0005462096,0.0065706656,0.031396363,0.0014218825,0.8699843,0.0014528029,0.07970425],"study_design_scores_gemma":[0.000035702953,0.00013608392,0.004935139,0.000593985,0.00013410108,0.00039436645,0.006126234,0.054471277,0.0023226286,0.90728784,0.023450293,0.00011242038],"about_ca_topic_score_codex":0.005239774,"about_ca_topic_score_gemma":0.0014180574,"teacher_disagreement_score":0.016519908,"about_ca_system_score_codex":0.0047037606,"about_ca_system_score_gemma":0.0039263596,"threshold_uncertainty_score":0.0686385},"labels":[],"label_agreement":null},{"id":"W2169037513","doi":"10.1139/l08-127","title":"Construction process technologies: a meta-analysis of Canadian research","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Process (computing); Process management; Technology roadmap; Quality (philosophy); Strategic planning; Business; Computer science; Engineering management; Engineering; Marketing","score_opus":0.20970119028251222,"score_gpt":0.37754133184709177,"score_spread":0.16784014156457955,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2169037513","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":"methods","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":"methods","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2167228,0.72308606,0.010661124,0.0037274698,0.0004891814,0.0026398643,0.038125545,0.00020261448,0.0043454515],"genre_scores_gemma":[0.83692944,0.12703426,0.017095642,0.0012360776,0.00009624163,0.0027307628,0.014207927,0.00018287156,0.00048681223],"study_design_codex":"meta_analysis","study_design_gemma":"meta_analysis","domain_scores_codex":[0.93271756,0.022180915,0.015339944,0.00779996,0.019692037,0.002269591],"domain_scores_gemma":[0.7790642,0.13779674,0.019420022,0.011430823,0.04887942,0.0034087866],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.0905312,0.0024606897,0.0067896293,0.047681168,0.0040359227,0.0062274095,0.0050417627,0.0016904402,0.0024425362],"category_scores_gemma":[0.19039436,0.0019138841,0.017421544,0.07355158,0.0019403814,0.0022159014,0.0040262034,0.0018958315,0.0001500071],"study_design_candidate":"meta_analysis","study_design_consensus":"meta_analysis","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022222588,0.0000948577,0.29292992,0.14359348,0.4783024,0.0009244474,0.009150758,0.0024193549,0.0010121705,0.0020333333,0.008731973,0.058585055],"study_design_scores_gemma":[0.00077424716,0.0003168801,0.33168712,0.05232556,0.58268034,0.0005910887,0.0057532177,0.0017148681,0.000946549,0.0013381455,0.021459002,0.00041292986],"about_ca_topic_score_codex":0.8383676,"about_ca_topic_score_gemma":0.89434785,"teacher_disagreement_score":0.953461,"about_ca_system_score_codex":0.04653902,"about_ca_system_score_gemma":0.09773205,"threshold_uncertainty_score":0.47878045},"labels":[],"label_agreement":null},{"id":"W2169767687","doi":"10.1016/j.sbspro.2013.03.035","title":"The Application of Project Management Standards and Success Factors to the Development of a Project Management Assessment Tool","year":2013,"lang":"en","type":"article","venue":"Procedia - Social and Behavioral Sciences","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; British Columbia Institute of Technology","funders":"","keywords":"Project management; Process management; Engineering management; OPM3; Program management; Project management triangle; Engineering; Computer science; Systems engineering","score_opus":0.12103731406339538,"score_gpt":0.4553647848932436,"score_spread":0.33432747082984826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2169767687","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08628763,0.00022063902,0.88580644,0.0012085716,0.00010002297,0.003026597,0.00032147949,0.0019237294,0.021105006],"genre_scores_gemma":[0.21065351,0.00017698522,0.7852789,0.00007286096,0.000021648613,0.0023071163,0.00038866422,0.00012226167,0.0009780164],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9595417,0.018112663,0.007024519,0.0015533962,0.01306513,0.00070261135],"domain_scores_gemma":[0.88896257,0.07297259,0.0059327777,0.005339029,0.025517033,0.001275988],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.046512093,0.0010681215,0.0010041752,0.012279029,0.0011624143,0.0065226476,0.0014777868,0.0012676042,0.0015332287],"category_scores_gemma":[0.130586,0.00086209836,0.0010593447,0.006334484,0.0018161893,0.007372599,0.0033406073,0.0023701603,0.0006782538],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017679545,0.0011103792,0.05250958,0.0011925246,0.00019334252,0.0003534481,0.0078236135,0.01655985,0.00842523,0.072455935,0.00388537,0.8353139],"study_design_scores_gemma":[0.0002966112,0.00389942,0.15197313,0.005468493,0.00047832812,0.0022291979,0.020841729,0.4715036,0.04655094,0.16861418,0.12708461,0.0010598318],"about_ca_topic_score_codex":0.0013543881,"about_ca_topic_score_gemma":0.0011295209,"teacher_disagreement_score":0.046512093,"about_ca_system_score_codex":0.0027304967,"about_ca_system_score_gemma":0.0062287822,"threshold_uncertainty_score":0.24598241},"labels":[],"label_agreement":null},{"id":"W2169973694","doi":"10.5539/jas.v6n4p173","title":"Evaluating Financial Viability of Olive Mills Enterprise in Jordan","year":2014,"lang":"en","type":"article","venue":"Journal of Agricultural Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Internal rate of return; Net present value; Business; Benefit–cost ratio; Cash flow; Economics; Finance; Production (economics); Microeconomics","score_opus":0.05681934589280139,"score_gpt":0.37740717108412775,"score_spread":0.32058782519132634,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2169973694","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9980563,0.00006772379,0.00009025804,0.000049685,0.0000010706996,0.000009050546,0.000051346626,0.0000012232765,0.0016734775],"genre_scores_gemma":[0.99908125,0.000085014864,0.00024010724,0.0000072735133,0.0000024945543,0.0000056177814,0.000071015784,6.2888535e-7,0.0005066661],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9986841,0.00041549833,0.00010720814,0.000065339074,0.0005406898,0.00018702817],"domain_scores_gemma":[0.99538463,0.0010305461,0.0016699044,0.00007032585,0.0012246912,0.0006198636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018757926,0.00022725172,0.00014843822,0.0020607067,0.00049163465,0.0013428951,0.00037626197,0.0002766863,0.0016543872],"category_scores_gemma":[0.0037093512,0.000089323185,0.00015633942,0.0012631406,0.00043010156,0.00085693825,0.0008831965,0.0001862572,0.00022708818],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017785124,0.00020409694,0.9599509,0.00006714132,0.00003783448,0.0011947902,0.001573408,0.0017095853,0.0013901985,0.0006411709,0.0003791924,0.032673832],"study_design_scores_gemma":[0.000010337549,0.00085894554,0.9617896,0.00008920021,0.000027780143,0.0008126588,0.024137372,0.005003292,0.0019665633,0.0009336997,0.004329731,0.000040796174],"about_ca_topic_score_codex":0.0024388733,"about_ca_topic_score_gemma":0.0040806993,"teacher_disagreement_score":0.0024388733,"about_ca_system_score_codex":0.0010703253,"about_ca_system_score_gemma":0.0010157073,"threshold_uncertainty_score":0.009920239},"labels":[],"label_agreement":null},{"id":"W2173284800","doi":"10.1139/l11-111","title":"Risk identification and mitigation for architectural, engineering, and construction firms operating in the Gulf region","year":2012,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"CONTEST; Recession; Identification (biology); Middle East; Business; Engineering; Civil engineering; Economy; Economics; Geography; Political science; Macroeconomics","score_opus":0.025740264628097004,"score_gpt":0.25880282383654446,"score_spread":0.23306255920844746,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2173284800","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99807334,0.00007389845,0.00013274957,0.0010389157,0.0000022541892,0.000009486483,0.00003334084,0.0000017584532,0.00063430774],"genre_scores_gemma":[0.99913055,0.0001297504,0.00014606355,0.00004129691,0.000002471426,0.000005606984,0.00004102707,7.718428e-7,0.00050233654],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99934167,0.00025503628,0.000029468052,0.000035292527,0.00007161949,0.00026696798],"domain_scores_gemma":[0.9975165,0.0010070349,0.0005807537,0.000054862012,0.00031857693,0.0005222402],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016510503,0.0003158004,0.00026118584,0.0009217357,0.0013047918,0.001571193,0.00054290117,0.0010121429,0.0024828152],"category_scores_gemma":[0.006616719,0.00022345684,0.0003648187,0.0008326695,0.00050735794,0.0009049083,0.0014025492,0.0011168193,0.00017978322],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011136876,0.0010685326,0.91394055,0.000060590086,0.00009802643,0.0007130762,0.0048941006,0.026520671,0.0006318957,0.0052327076,0.0022709954,0.043455124],"study_design_scores_gemma":[0.00014641129,0.0012231863,0.7822594,0.00028118034,0.00016169803,0.00034111322,0.098471396,0.10110496,0.0018253687,0.009852147,0.00424776,0.00008543338],"about_ca_topic_score_codex":0.119460605,"about_ca_topic_score_gemma":0.15424342,"teacher_disagreement_score":0.119460605,"about_ca_system_score_codex":0.0029363113,"about_ca_system_score_gemma":0.0041827224,"threshold_uncertainty_score":0.23753053},"labels":[],"label_agreement":null},{"id":"W2176787685","doi":"10.5539/jsd.v8n9p139","title":"Assessment of Contractors’ Mitigating Measures for Cost Overrun of Building Projects in South-Western Nigeria","year":2015,"lang":"en","type":"article","venue":"Journal of Sustainable Development","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cost overrun; Schedule; Descriptive statistics; Business; Sample (material); Simple random sample; Operations management; Transport engineering; Computer science; Construction engineering; Engineering; Mathematics; Statistics; Construction industry","score_opus":0.11420688516971929,"score_gpt":0.387628493954397,"score_spread":0.27342160878467775,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2176787685","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9974759,0.00030529627,0.00026059712,0.00022550476,0.000004982914,0.0000458577,0.00001043588,0.000002126836,0.00166933],"genre_scores_gemma":[0.9986532,0.0004279971,0.0004746579,0.000026121126,0.0000036406227,0.0000148386125,0.000007180933,8.1795247e-7,0.00039154536],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9967982,0.0011671907,0.0002671126,0.00012831796,0.0010396278,0.0005995579],"domain_scores_gemma":[0.99140644,0.0015486374,0.004478849,0.0001965999,0.001304439,0.0010651249],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034695428,0.00026671504,0.00019281545,0.0013156151,0.0013863042,0.0012065743,0.0004889829,0.0004281956,0.00093768525],"category_scores_gemma":[0.007809582,0.00021226167,0.00012449123,0.0011146357,0.0008008807,0.00070742454,0.00095984334,0.0004691017,0.00006952834],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015893261,0.00048737705,0.8236562,0.0005753974,0.000065875836,0.0023725638,0.026710441,0.0016045076,0.0049387254,0.002343492,0.000991778,0.13609466],"study_design_scores_gemma":[0.0000063108014,0.0005442358,0.90366834,0.00033349314,0.000029652283,0.0006818615,0.084151775,0.0011569456,0.0011348717,0.00035974706,0.007898044,0.000034767552],"about_ca_topic_score_codex":0.0069552734,"about_ca_topic_score_gemma":0.017790362,"teacher_disagreement_score":0.0069552734,"about_ca_system_score_codex":0.0017775453,"about_ca_system_score_gemma":0.005446696,"threshold_uncertainty_score":0.018348932},"labels":[],"label_agreement":null},{"id":"W2183292324","doi":"10.19030/jber.v2i2.2856","title":"The Client-Consulting Relationship: A Case Study Of Critical Success Factors At MQ Telecommuniques","year":2011,"lang":"en","type":"article","venue":"Journal of Business & Economics Research (JBER)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Bell (Canada); Concordia University","funders":"","keywords":"Font; Style (visual arts); Psychology; Computer science; Artificial intelligence","score_opus":0.5066548243523413,"score_gpt":0.4898417657379281,"score_spread":0.016813058614413234,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2183292324","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9833098,0.00034964902,0.0006541961,0.0026946808,0.000022901924,0.000110659945,0.000019715955,0.00003269427,0.01280579],"genre_scores_gemma":[0.99217844,0.00038757574,0.00067765196,0.00044216047,0.000021332244,0.00006046675,0.000013930755,0.00002398705,0.0061945207],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9924697,0.004500081,0.000202848,0.00031305372,0.0010508307,0.001463467],"domain_scores_gemma":[0.97595835,0.013130824,0.0020183972,0.00045181892,0.0021341671,0.0063063335],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046312013,0.00041361232,0.00038422886,0.0017356798,0.016357204,0.0048527843,0.0019557246,0.003090516,0.0076746177],"category_scores_gemma":[0.015749812,0.00052929024,0.00027195178,0.0027514936,0.0035787174,0.0019279014,0.0031234154,0.0035060167,0.0008756833],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014432054,0.0016585083,0.05078831,0.00037405404,0.000024812913,0.057365675,0.81784654,0.00039254714,0.0026844821,0.0075765136,0.006891707,0.05425251],"study_design_scores_gemma":[0.00001736663,0.00039856456,0.03283472,0.00013181375,0.000016247937,0.008772749,0.93975675,0.00070435647,0.0009958544,0.00047991177,0.01585078,0.00004100343],"about_ca_topic_score_codex":0.04304734,"about_ca_topic_score_gemma":0.13302432,"teacher_disagreement_score":0.04304734,"about_ca_system_score_codex":0.010422532,"about_ca_system_score_gemma":0.011386615,"threshold_uncertainty_score":0.08559352},"labels":[],"label_agreement":null},{"id":"W2183594974","doi":"10.7492/ijaec.2014.009","title":"Front end Governance of Major Public Projects - Lessons with a Norwegian Quality Assurance Scheme","year":2014,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Norwegian; Quality assurance; Corporate governance; Scheme (mathematics); Business; Front and back ends; Public administration; Accounting; Political science; Engineering; Finance; Marketing","score_opus":0.02554777275909539,"score_gpt":0.2950218553824076,"score_spread":0.26947408262331224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2183594974","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.64079416,0.004176317,0.04652073,0.026250346,0.00035601997,0.0004926315,0.0004138319,0.00022269707,0.28077328],"genre_scores_gemma":[0.9601225,0.0015002692,0.010512986,0.00035932264,0.00003097538,0.00008834734,0.00012138323,0.000034216588,0.027229875],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9948277,0.0023111613,0.00022646044,0.0002798398,0.0012913945,0.0010634885],"domain_scores_gemma":[0.99364257,0.0021030765,0.0006728972,0.000888856,0.0015316822,0.0011608639],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009992958,0.00021279034,0.0002046331,0.0004484081,0.0018710749,0.003827753,0.0009501437,0.0008529376,0.0021061962],"category_scores_gemma":[0.0068914522,0.00023256172,0.00032283607,0.00097046135,0.0031543167,0.0019786365,0.0026288219,0.0011321875,0.00028804457],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045291748,0.00039245814,0.032661997,0.00051626284,0.000039069735,0.0026499936,0.022514505,0.092560425,0.0026519462,0.62487125,0.024979174,0.19570996],"study_design_scores_gemma":[0.00027172748,0.0009367578,0.10769659,0.0012551671,0.000057560952,0.00060768396,0.044405904,0.049246714,0.0031079685,0.17246775,0.619729,0.00021719268],"about_ca_topic_score_codex":0.19294187,"about_ca_topic_score_gemma":0.18125944,"teacher_disagreement_score":0.19294187,"about_ca_system_score_codex":0.011566951,"about_ca_system_score_gemma":0.015911715,"threshold_uncertainty_score":0.38363767},"labels":[],"label_agreement":null},{"id":"W2187138537","doi":"","title":"Project Risk Management Incorporating Knight, Ellsberg & Kahneman","year":2015,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Thompson Rivers University","funders":"","keywords":"Project risk management; Risk management; Work (physics); Extant taxon; Project management triangle; Risk analysis (engineering); Knight; Risk management plan; Knowledge management; Business; Project management; IT risk management; Actuarial science; Computer science; Management; Economics; Engineering; Finance","score_opus":0.060836855966283215,"score_gpt":0.3452098301534766,"score_spread":0.28437297418719343,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2187138537","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06314575,0.008367377,0.6801015,0.039959982,0.0007429789,0.001265922,0.00014277612,0.00036973984,0.205904],"genre_scores_gemma":[0.78580797,0.005326261,0.1915488,0.0025483896,0.00033537726,0.0007327074,0.0000820025,0.000079606005,0.0135388365],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.95666414,0.012910587,0.00542736,0.0024591973,0.021589017,0.00094968727],"domain_scores_gemma":[0.94559324,0.022648828,0.010833051,0.00516935,0.014198262,0.0015572036],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.029113878,0.0009960405,0.0009075916,0.0054965345,0.0030750802,0.0116043445,0.0018893642,0.0021454215,0.0023201627],"category_scores_gemma":[0.07124758,0.000849104,0.0010897742,0.0027099818,0.0076827058,0.010938282,0.007802341,0.0045112013,0.00070570444],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010662811,0.0003300538,0.017013805,0.0008496,0.00016206058,0.00045727481,0.01062879,0.01592697,0.0017126192,0.6239359,0.011919104,0.31695724],"study_design_scores_gemma":[0.00006283826,0.0004866504,0.020934163,0.0020803858,0.00023317765,0.0020091385,0.008476693,0.0335175,0.0023660832,0.8217947,0.107671134,0.0003674933],"about_ca_topic_score_codex":0.006257932,"about_ca_topic_score_gemma":0.007102294,"teacher_disagreement_score":0.029113878,"about_ca_system_score_codex":0.0077693863,"about_ca_system_score_gemma":0.014730586,"threshold_uncertainty_score":0.15397072},"labels":[],"label_agreement":null},{"id":"W2187925004","doi":"","title":"The Four Controversial Practices within the Project Management Office Lifecycle (PMOLC): Two Case Studies & Analysis of these Controversial PMO Trends","year":2012,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Best practice; Project management; Process management; Management","score_opus":0.19174206608163716,"score_gpt":0.4622844224663092,"score_spread":0.27054235638467206,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2187925004","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9508929,0.0010093056,0.0096652275,0.007433013,0.000033293254,0.00042399438,0.000053820568,0.000023278817,0.030465096],"genre_scores_gemma":[0.9891992,0.00087819644,0.006189603,0.00032590982,0.000015898708,0.0002787567,0.000030072579,0.0000166885,0.003065698],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.97123116,0.019458031,0.0012588605,0.0011013258,0.005295757,0.0016548311],"domain_scores_gemma":[0.94792205,0.039527383,0.0058169374,0.0021886793,0.0034047253,0.0011401981],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017557824,0.00032852695,0.00034048728,0.0028541621,0.01043388,0.008493259,0.0019745128,0.0034111412,0.00095208874],"category_scores_gemma":[0.031203603,0.0005619132,0.00035353296,0.006062249,0.011335387,0.006062712,0.004184892,0.0032603086,0.00013375859],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019915441,0.00052810466,0.052734222,0.00064081245,0.000025486997,0.01224674,0.67699856,0.0017946579,0.002363786,0.15431164,0.0038073303,0.094349414],"study_design_scores_gemma":[0.00004431808,0.00033873966,0.031186646,0.00094321574,0.00003463511,0.0050931247,0.8270081,0.0029864395,0.0039538923,0.0156942,0.112618715,0.00009795389],"about_ca_topic_score_codex":0.015619554,"about_ca_topic_score_gemma":0.030297175,"teacher_disagreement_score":0.017557824,"about_ca_system_score_codex":0.010828956,"about_ca_system_score_gemma":0.006159171,"threshold_uncertainty_score":0.09285581},"labels":[],"label_agreement":null},{"id":"W2188166182","doi":"10.11575/prism/25622","title":"Developing Benchmarking Metrics for Pipeline Projects in Alberta","year":2013,"lang":"en","type":"dissertation","venue":"PRISM (University of Calgary)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Benchmarking; Pipeline (software); Engineering management; Engineering; Computer science; Construction engineering; Environmental planning; Data science; Environmental resource management; Business; Geography; Environmental science; Mechanical engineering; Marketing","score_opus":0.059256541857441045,"score_gpt":0.3025743008731124,"score_spread":0.24331775901567132,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2188166182","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6347196,0.0026742,0.23192833,0.0012998999,0.00028203768,0.0027812014,0.027444048,0.004945087,0.093925625],"genre_scores_gemma":[0.82305914,0.0013187242,0.14065824,0.000077533296,0.000026634463,0.00090376,0.027169256,0.0002903845,0.006496388],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9888265,0.0020537716,0.0009129306,0.000731995,0.006439511,0.001035202],"domain_scores_gemma":[0.9719115,0.0030792882,0.003625158,0.0012487374,0.0186568,0.0014784199],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011566187,0.00097534806,0.0007624,0.015732864,0.0015724255,0.0043150135,0.001971341,0.0007381612,0.0016136434],"category_scores_gemma":[0.025937412,0.00043521114,0.00071399065,0.028185371,0.0007687214,0.0022118231,0.0024558275,0.00066912913,0.0004968238],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039197947,0.00043153283,0.27968735,0.00090179563,0.00020729315,0.0004961,0.0029917888,0.1754286,0.004691145,0.033244364,0.029770978,0.47175708],"study_design_scores_gemma":[0.00006071355,0.0007327966,0.5892445,0.0006679806,0.00011381533,0.0003084659,0.008148888,0.29546678,0.0066674342,0.011241439,0.08711603,0.00023122701],"about_ca_topic_score_codex":0.49295,"about_ca_topic_score_gemma":0.5117213,"teacher_disagreement_score":0.50705004,"about_ca_system_score_codex":0.016972639,"about_ca_system_score_gemma":0.016437642,"threshold_uncertainty_score":0.9801614},"labels":[],"label_agreement":null},{"id":"W2189354070","doi":"10.7492/ijaec.2014.007","title":"The Cultural Ecosystem of Megaprojects: The Interconnectedness of Organizational Elements and their Wider Institutional Contexts","year":2014,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Ecosystem; Sociology; Environmental resource management; Economic geography; Knowledge management; Political science; Geography; Ecology; Economics; Computer science; Biology","score_opus":0.009825396592236026,"score_gpt":0.2551829048327622,"score_spread":0.24535750824052616,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2189354070","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9058101,0.0022562451,0.03081815,0.0038648203,0.000065499524,0.0000926556,0.00006143793,0.000040557024,0.056990504],"genre_scores_gemma":[0.9961255,0.00040757188,0.002820711,0.00009605432,0.000009611539,0.000029986906,0.000012807572,0.000010288318,0.00048746695],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99396175,0.0044896654,0.00014307615,0.00045483146,0.0005636067,0.0003869435],"domain_scores_gemma":[0.9946503,0.0029599147,0.00077289797,0.00065910385,0.0004067186,0.00055118045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004311078,0.000315938,0.0003734222,0.0024123667,0.0054875384,0.011474984,0.0009786978,0.0009212418,0.0021247226],"category_scores_gemma":[0.0068773483,0.0004966967,0.0002555007,0.0026118052,0.021438627,0.008585234,0.01131513,0.0013578888,0.00015486138],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010439605,0.000109250046,0.09406836,0.00046632867,0.00012345519,0.0027589707,0.5400503,0.0015216757,0.003109592,0.27406818,0.0013064486,0.08231302],"study_design_scores_gemma":[0.000017348568,0.00015571553,0.10244228,0.00078624673,0.000085728905,0.0022047071,0.69348836,0.0024290758,0.0010166806,0.13441159,0.062879,0.00008315987],"about_ca_topic_score_codex":0.0031987363,"about_ca_topic_score_gemma":0.0055647246,"teacher_disagreement_score":0.011474984,"about_ca_system_score_codex":0.0025223275,"about_ca_system_score_gemma":0.003737701,"threshold_uncertainty_score":0.022799492},"labels":[],"label_agreement":null},{"id":"W2190286850","doi":"10.28945/2265","title":"Factors of Project Manager Success","year":2015,"lang":"en","type":"article","venue":"Interdisciplinary Journal of Information Knowledge and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"International Civil Aviation Organization; Concordia University","funders":"","keywords":"Project manager; Context (archaeology); Certification; Critical success factor; Project sponsorship; Functional manager; Project management; Exploratory research; Exploratory factor analysis; Success factors; Project stakeholder; Public relations; Business; Psychology; Knowledge management; Management; Project management triangle; Political science; Process management; Marketing; Project charter; Sociology; Computer science; Business administration","score_opus":0.11690618584062715,"score_gpt":0.410194749788723,"score_spread":0.2932885639480959,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2190286850","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9788167,0.00028688167,0.0020903507,0.0005791713,0.00002438396,0.00007114396,0.00008880825,0.000036302485,0.018006273],"genre_scores_gemma":[0.9985819,0.00007752185,0.00045822925,0.000016468563,0.000009868871,0.000021790185,0.000036735346,0.0000048213496,0.0007926984],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9939785,0.0024186198,0.00047214393,0.0003128269,0.0019926068,0.00082536496],"domain_scores_gemma":[0.9479031,0.026024757,0.010553787,0.0015077883,0.0058100247,0.008200569],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005594828,0.00031193465,0.00022037911,0.0018320349,0.0010384747,0.0025023893,0.00040097308,0.00033949656,0.0066961455],"category_scores_gemma":[0.03297673,0.00017833659,0.00020194413,0.0012403275,0.0009040815,0.0011645999,0.0014053248,0.00066255755,0.00085070875],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017111025,0.0003741141,0.90455765,0.00026317235,0.00009506823,0.0005347935,0.01366056,0.0005370902,0.0015736724,0.00403232,0.0025461772,0.07165421],"study_design_scores_gemma":[0.000012836439,0.0005260614,0.955345,0.00015638537,0.000036001853,0.0007261447,0.02619629,0.0008983364,0.0006830091,0.0014779337,0.013898562,0.000043557466],"about_ca_topic_score_codex":0.0012572716,"about_ca_topic_score_gemma":0.0012521615,"teacher_disagreement_score":0.0066961455,"about_ca_system_score_codex":0.000679396,"about_ca_system_score_gemma":0.0018947176,"threshold_uncertainty_score":0.02958864},"labels":[],"label_agreement":null},{"id":"W2197967215","doi":"10.7508/isih.2009.04.006","title":"Utilization of Research Findings and their Role in Research Management as an Interdisciplinary Field","year":2009,"lang":"en","type":"article","venue":"DOAJ (DOAJ: Directory of Open Access Journals)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Field (mathematics); Data science; Computer science; Mathematics","score_opus":0.6726673731628761,"score_gpt":0.7064213289536602,"score_spread":0.03375395579078411,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2197967215","genre_codex":"methods","genre_gemma":"empirical","domain_codex":"methods","domain_gemma":"methods","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":"methods","domain_consensus":"methods","prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13464586,0.07901882,0.38590506,0.2140891,0.0039169327,0.0019298848,0.00024421993,0.00081224414,0.17943795],"genre_scores_gemma":[0.877701,0.011942464,0.10275257,0.0031256687,0.00097573013,0.0015185795,0.000046585898,0.00013894576,0.0017983413],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.43987852,0.4815937,0.02249584,0.009230014,0.042061675,0.004740257],"domain_scores_gemma":[0.3117637,0.5719676,0.037070088,0.041231286,0.0314091,0.006558203],"candidate_categories":["metaresearch"],"consensus_categories":["metaresearch"],"category_scores_codex":[0.42082196,0.0012228901,0.0028958954,0.030934978,0.011187179,0.04836661,0.0051534344,0.006693323,0.0014568099],"category_scores_gemma":[0.36940727,0.0020406283,0.0012868508,0.020765256,0.07726809,0.044245638,0.01942248,0.0058537833,0.00024384049],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006598872,0.0001274984,0.008990803,0.0015064437,0.00014647598,0.00032507084,0.08342965,0.0006685671,0.00033544484,0.7683828,0.0036805945,0.13234067],"study_design_scores_gemma":[0.000080940896,0.0003178453,0.00903642,0.0072453925,0.00020055714,0.00087641046,0.16113271,0.0049244924,0.0010238364,0.7485889,0.06626896,0.00030351433],"about_ca_topic_score_codex":0.0025419367,"about_ca_topic_score_gemma":0.0021535123,"teacher_disagreement_score":0.57917804,"about_ca_system_score_codex":0.0150567945,"about_ca_system_score_gemma":0.02648724,"threshold_uncertainty_score":0.71422964},"labels":[],"label_agreement":null},{"id":"W2206626246","doi":"10.5539/ass.v12n1p223","title":"Change Order Management Factors in Building Projects in Northern Nigeria","year":2015,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Abandonment (legal); Change order; Order (exchange); Stratified sampling; Business; Questionnaire; Arbitration; Operations management; Contract management; Change management (ITSM); Service (business); Index (typography); Project management; Marketing; Engineering; Computer science; Project planning; Management; Finance; Economics; Mathematics; Political science; Statistics","score_opus":0.1472156395361681,"score_gpt":0.38592023151481203,"score_spread":0.23870459197864394,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2206626246","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99868506,0.00022012247,0.00006373644,0.00007059619,0.0000016064514,0.000019745063,0.000014238501,0.0000013853153,0.0009236004],"genre_scores_gemma":[0.9991786,0.00035933685,0.00014928347,0.000007910369,0.0000013514139,0.000009671849,0.000015895987,8.709952e-7,0.00027705898],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9990497,0.00027521892,0.00012082391,0.000066570086,0.00034371865,0.00014394052],"domain_scores_gemma":[0.9945528,0.001865875,0.0023377493,0.000086894295,0.0005933922,0.00056331215],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009099689,0.00018470196,0.00015708269,0.0013486885,0.0009626366,0.001361422,0.00018794395,0.00027778136,0.0015683672],"category_scores_gemma":[0.0051244996,0.00026782093,0.00016030106,0.0017232816,0.0005449688,0.0006811727,0.0006064993,0.00038544563,0.00009124264],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004948234,0.0002955713,0.94504714,0.00023287063,0.000014855508,0.0012598945,0.018027276,0.0004070555,0.0009691868,0.00052648445,0.00034985537,0.032820407],"study_design_scores_gemma":[0.0000020174748,0.000084944084,0.95331234,0.00012714822,0.000008505493,0.0004901683,0.043334622,0.00035724445,0.00016359978,0.00010957372,0.0019994709,0.000010429043],"about_ca_topic_score_codex":0.010824406,"about_ca_topic_score_gemma":0.026187362,"teacher_disagreement_score":0.010824406,"about_ca_system_score_codex":0.0012844665,"about_ca_system_score_gemma":0.0024446633,"threshold_uncertainty_score":0.02152282},"labels":[],"label_agreement":null},{"id":"W2219248941","doi":"","title":"La gestion des risques d'un projet de développement et d'implantation d'un système informatisé au Ministère de la Justice du Québec","year":2008,"lang":"fr","type":"article","venue":"Génie logiciel","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Political science; Humanities; Art","score_opus":0.06354816114460814,"score_gpt":0.3491420252553707,"score_spread":0.28559386411076254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2219248941","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77149886,0.0020467008,0.018599771,0.027725102,0.00030144776,0.0015814983,0.0037869238,0.0014220915,0.17303763],"genre_scores_gemma":[0.9026451,0.0010158166,0.015612736,0.0013724769,0.000057159654,0.000957693,0.0019204313,0.00012522737,0.07629333],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9873953,0.0045001153,0.00032405125,0.00095378386,0.004575753,0.0022511135],"domain_scores_gemma":[0.9480663,0.01009188,0.0040453053,0.0021792694,0.026262619,0.009354664],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019410111,0.00072303374,0.00045140146,0.002783023,0.003694634,0.006301557,0.001516914,0.0016282131,0.013198151],"category_scores_gemma":[0.03662075,0.0005524347,0.00063628674,0.002397245,0.0018220873,0.0021844192,0.0032052214,0.001668702,0.0018718177],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017153539,0.0014879081,0.3956554,0.0009768644,0.00032365764,0.00065731123,0.021514505,0.0126075875,0.008935288,0.032351993,0.048173115,0.47560108],"study_design_scores_gemma":[0.0002600391,0.002022441,0.79985136,0.0007080783,0.00025608862,0.00017401697,0.012620846,0.0074620917,0.006907756,0.0034439988,0.16611585,0.0001773676],"about_ca_topic_score_codex":0.69981533,"about_ca_topic_score_gemma":0.66346747,"teacher_disagreement_score":0.30018467,"about_ca_system_score_codex":0.032724805,"about_ca_system_score_gemma":0.0901972,"threshold_uncertainty_score":0.603905},"labels":[],"label_agreement":null},{"id":"W2230896697","doi":"10.1061/(asce)sc.1943-5576.0000281","title":"Change Order Clauses in Standard Contract Documents","year":2016,"lang":"en","type":"article","venue":"Practice Periodical on Structural Design and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Order (exchange); Change order; Confusion; Construction contract; Profit (economics); Contract management; Business; Overhead (engineering); Process (computing); Joint (building); Actuarial science; Computer science; Operations management; Operations research; Economics; Finance; Management; Engineering; Project management; Marketing; Civil engineering; Microeconomics","score_opus":0.09863255256086101,"score_gpt":0.3878623592206512,"score_spread":0.2892298066597902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2230896697","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057130117,0.72317076,0.041597176,0.010871762,0.0025187642,0.0013357642,0.0026991414,0.0003102395,0.1603662],"genre_scores_gemma":[0.563944,0.3585067,0.048593137,0.008685177,0.0012247332,0.0013451705,0.0061242334,0.00041738496,0.011159457],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.824248,0.035399787,0.027643941,0.005390353,0.104612134,0.0027057456],"domain_scores_gemma":[0.61995214,0.26084605,0.04671359,0.012542679,0.05892401,0.001021617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.057608888,0.00042212603,0.00087767607,0.019313883,0.0023224552,0.008351832,0.0027044872,0.0023929975,0.003262133],"category_scores_gemma":[0.1757142,0.0007550461,0.0009465011,0.032593187,0.0045223013,0.0067362743,0.0020324073,0.0028863775,0.0006934379],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020962162,0.00014768977,0.007003983,0.017239798,0.000102946186,0.00035389798,0.007818856,0.0026432818,0.0016858083,0.2629496,0.038873617,0.6609709],"study_design_scores_gemma":[0.000021543225,0.000119909484,0.011674921,0.024602598,0.00012429613,0.00089012296,0.0042154556,0.0004928757,0.0027778158,0.014396462,0.94056135,0.00012276499],"about_ca_topic_score_codex":0.015560789,"about_ca_topic_score_gemma":0.012172653,"teacher_disagreement_score":0.057608888,"about_ca_system_score_codex":0.011444544,"about_ca_system_score_gemma":0.024285292,"threshold_uncertainty_score":0.30466855},"labels":[],"label_agreement":null},{"id":"W2232643802","doi":"10.5539/ass.v12n1p129","title":"Assessing the Duties and Competencies of Female Quantity Surveyors","year":2015,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Procurement; Activity-based costing; Business; Negotiation; Teamwork; Control (management); Work (physics); Questionnaire; Accounting; Call for bids; Core competency; Construction industry; Operations management; Marketing; Management; Engineering; Political science; Economics; Sociology; Construction engineering","score_opus":0.25909817162077975,"score_gpt":0.4444537159835139,"score_spread":0.18535554436273416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2232643802","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9960536,0.00010063232,0.00088606414,0.0002840056,0.00001736945,0.000065217704,0.00013376381,0.000005912087,0.0024535449],"genre_scores_gemma":[0.9957853,0.00015125665,0.0009517075,0.00016101141,0.0000116311585,0.000118344804,0.00014983045,0.000003598728,0.0026673318],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99470586,0.0026706427,0.00044492693,0.00035183644,0.0010901834,0.0007365099],"domain_scores_gemma":[0.9842535,0.0034139713,0.0047870306,0.0008609772,0.0045278696,0.0021565564],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006180943,0.00021844068,0.00017190643,0.0014137217,0.0007439485,0.0009250442,0.00029346094,0.00030732204,0.0039656684],"category_scores_gemma":[0.015639156,0.00024320709,0.00015447322,0.0008076717,0.0007623582,0.00072357355,0.0012439501,0.0002856233,0.0010876744],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012223281,0.00012921507,0.93908405,0.000099354496,0.000011452882,0.00017173385,0.015047111,0.00011058382,0.002271738,0.00043000316,0.0015140624,0.041008428],"study_design_scores_gemma":[0.000012567541,0.00047861817,0.93378156,0.00010890161,0.000008333401,0.00045300115,0.050076306,0.000502595,0.0010607804,0.00021955471,0.013278014,0.000019852174],"about_ca_topic_score_codex":0.0031900818,"about_ca_topic_score_gemma":0.0050193467,"teacher_disagreement_score":0.006180943,"about_ca_system_score_codex":0.0006855517,"about_ca_system_score_gemma":0.0013218725,"threshold_uncertainty_score":0.03268832},"labels":[],"label_agreement":null},{"id":"W2235408777","doi":"","title":"MANAGING VARIABILITY IN HOUSE PRODUCTION","year":2007,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Production (economics); Lean manufacturing; Process (computing); Operations management; Engineering; Computer science; Manufacturing engineering; Economics","score_opus":0.07795037561820786,"score_gpt":0.372000765328328,"score_spread":0.2940503897101201,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2235408777","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6636031,0.0005015842,0.32911018,0.00036656045,0.0000363673,0.0000724747,0.00018256874,0.00047604262,0.0056510684],"genre_scores_gemma":[0.98492986,0.00010847905,0.014340281,0.000016449234,0.000023103637,0.000025745081,0.00013416163,0.00003994346,0.00038207663],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9968934,0.00087557896,0.00022585051,0.0005806634,0.001016577,0.00040802496],"domain_scores_gemma":[0.9891205,0.0065688062,0.0018054581,0.0013902345,0.0008017106,0.00031331877],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038297102,0.0003868544,0.00079308567,0.0009819817,0.0008013612,0.0024040923,0.0011578486,0.00051288155,0.00061220414],"category_scores_gemma":[0.011451829,0.00035409626,0.00052202825,0.0015690872,0.0006373856,0.0014612783,0.0016587378,0.000766925,0.00012331917],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004312947,0.0002544651,0.091122,0.00023723823,0.00026798298,0.0012733804,0.0024740682,0.57301664,0.01890314,0.012865278,0.0013801785,0.29777443],"study_design_scores_gemma":[0.000052232965,0.00066755555,0.12463147,0.00009834572,0.0002400964,0.0013836677,0.0032468026,0.76696783,0.02392015,0.065408975,0.013184,0.0001988105],"about_ca_topic_score_codex":0.0021721139,"about_ca_topic_score_gemma":0.0026138867,"teacher_disagreement_score":0.0038297102,"about_ca_system_score_codex":0.0010981989,"about_ca_system_score_gemma":0.0011449951,"threshold_uncertainty_score":0.020253658},"labels":[],"label_agreement":null},{"id":"W2235794463","doi":"","title":"INNOVATION IN THE QUEENSLAND ROAD AND BRIDGE INDUSTRY","year":2002,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Business; Innovation management; Marketing; Engineering","score_opus":0.17995366655280567,"score_gpt":0.3693508054683445,"score_spread":0.1893971389155388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2235794463","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98769367,0.00052713597,0.00024028972,0.0010402106,0.000009105937,0.000058350382,0.000044104105,0.000003955947,0.010383245],"genre_scores_gemma":[0.9924259,0.00066183764,0.00028122094,0.000214773,0.0000110828605,0.00007787203,0.00004358587,0.0000024181477,0.0062814136],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9948186,0.0017258049,0.00017581347,0.00039396182,0.0018057919,0.001080011],"domain_scores_gemma":[0.99361414,0.0023453361,0.0013112258,0.00014994053,0.0012497792,0.0013296893],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034425654,0.00011214626,0.00023934136,0.0021245487,0.0031226466,0.0019211847,0.00057152373,0.0010512522,0.007297087],"category_scores_gemma":[0.0071600694,0.00022761774,0.00024945862,0.002600275,0.0014479285,0.0011464887,0.0020301957,0.00054677814,0.00033972904],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019036997,0.0006090997,0.4989902,0.00075250724,0.000043854838,0.0019042254,0.3122268,0.001291427,0.0032606474,0.019954594,0.0071840156,0.15359227],"study_design_scores_gemma":[0.000042464675,0.00091114856,0.7950815,0.00028623253,0.000023972369,0.00067187403,0.11486268,0.0010858777,0.0003973667,0.0026711405,0.083899125,0.0000667502],"about_ca_topic_score_codex":0.106850825,"about_ca_topic_score_gemma":0.14045817,"teacher_disagreement_score":0.106850825,"about_ca_system_score_codex":0.0067561157,"about_ca_system_score_gemma":0.0113862185,"threshold_uncertainty_score":0.21245778},"labels":[],"label_agreement":null},{"id":"W2239409977","doi":"10.1139/cjce-2015-0127","title":"Bibliometric analysis of research in international construction","year":2016,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scopus; Competition (biology); Productivity; Regional science; International market; Distribution (mathematics); Political science; Business; Economics; International trade; Sociology; Economic growth; Mathematics","score_opus":0.09886149818101055,"score_gpt":0.3698807497652859,"score_spread":0.27101925158427537,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2239409977","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":"evaluation","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":"evaluation","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4434783,0.12911442,0.010684361,0.004646823,0.001199585,0.0023967198,0.1666294,0.0012717381,0.24057868],"genre_scores_gemma":[0.7965387,0.08464875,0.022491602,0.00048736166,0.0013764376,0.0035232988,0.079384655,0.0002901483,0.011259003],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9543654,0.0067741005,0.009870259,0.0020535449,0.025561435,0.0013753118],"domain_scores_gemma":[0.8870681,0.058249716,0.021842815,0.0042846454,0.026891392,0.0016633151],"candidate_categories":["metaresearch","bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.014575475,0.0007972038,0.0024512224,0.33204085,0.0020373245,0.0088764,0.0011918861,0.0008054624,0.008134152],"category_scores_gemma":[0.08977451,0.0003158558,0.0017120627,0.4175392,0.001308832,0.003923759,0.0038249868,0.0006555152,0.0017751583],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043846006,0.0002833585,0.2952144,0.04564652,0.0022067341,0.0010576702,0.012491466,0.0023830356,0.0041340375,0.03303055,0.05959896,0.5435148],"study_design_scores_gemma":[0.00006311867,0.00020830442,0.661094,0.006934984,0.00152925,0.0018209565,0.017680196,0.003169517,0.0030279702,0.010003343,0.2942891,0.0001792955],"about_ca_topic_score_codex":0.00769737,"about_ca_topic_score_gemma":0.008249121,"teacher_disagreement_score":0.9854245,"about_ca_system_score_codex":0.004926104,"about_ca_system_score_gemma":0.009066614,"threshold_uncertainty_score":0.07708341},"labels":[],"label_agreement":null},{"id":"W2246298431","doi":"10.17226/23221","title":"Transportation Asset Management: Strategic Workshop for Department of Transportation Executives","year":2008,"lang":"en","type":"book","venue":"Transportation Research Board eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Asset management; Asset (computer security); Transport engineering; Engineering; Finance; Computer science; Computer security","score_opus":0.23620598761975817,"score_gpt":0.4258791072392345,"score_spread":0.18967311961947633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2246298431","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0021922651,0.018051133,0.010211931,0.055536237,0.0221967,0.0005500959,0.0015239839,0.0012687325,0.8884689],"genre_scores_gemma":[0.0034098576,0.005022662,0.00329455,0.0031480514,0.0006752771,0.00016161172,0.00066606095,0.00012709691,0.9834947],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996364,0.00007353345,0.000020950016,0.00004128406,0.00017513352,0.000052582665],"domain_scores_gemma":[0.99945885,0.00006666025,0.000018466098,0.00002396622,0.00032110882,0.00011094283],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013673356,0.00074690895,0.00031367087,0.0007455464,0.0011964759,0.0034587083,0.0009881628,0.00192434,0.07650898],"category_scores_gemma":[0.001454211,0.00035784717,0.00030984095,0.0009988791,0.00037704292,0.002717737,0.0015157517,0.0021387555,0.044711165],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000302479,0.000022596554,0.000029600218,0.000024814004,2.9527584e-7,0.000024192215,0.000074260315,0.000064255604,0.0000667652,0.004322166,0.95418197,0.041186094],"study_design_scores_gemma":[0.0000014741152,0.0000050674375,0.00010069499,0.000053209737,3.1682933e-7,0.00002440691,0.00012726891,0.00004735267,0.00002969297,0.00085013796,0.99875855,0.0000018984451],"about_ca_topic_score_codex":0.006283593,"about_ca_topic_score_gemma":0.014801718,"teacher_disagreement_score":0.07650898,"about_ca_system_score_codex":0.0026398997,"about_ca_system_score_gemma":0.004960303,"threshold_uncertainty_score":0.255948},"labels":[],"label_agreement":null},{"id":"W2248402089","doi":"","title":"Étude des facteurs de risques de dépassements de coûts dans les projets de construction de routes et de grands travaux au Québec","year":2015,"lang":"fr","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Philosophy","score_opus":0.10777036870136446,"score_gpt":0.4057050249752122,"score_spread":0.29793465627384774,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2248402089","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9949356,0.0001258178,0.00034528974,0.00064757274,0.000007950344,0.000016962838,0.00017366731,0.000004949043,0.0037423668],"genre_scores_gemma":[0.9954722,0.000121128534,0.000116043324,0.0000585598,0.0000034231216,0.000017581384,0.00010926492,0.000003902295,0.0040978994],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.995978,0.00097050826,0.00016010461,0.00046982188,0.001678683,0.00074288],"domain_scores_gemma":[0.9682795,0.0077656056,0.006803908,0.0010699732,0.011791007,0.004290027],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0042550173,0.00028286374,0.00028776104,0.0018873689,0.0027762635,0.002782228,0.0011826578,0.0008603836,0.0046435953],"category_scores_gemma":[0.018714512,0.00035090648,0.0003567386,0.0024968619,0.0020818836,0.0011096657,0.0015399944,0.001652764,0.00040528257],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055858978,0.000050660787,0.9607827,0.00004398141,0.00004676901,0.00018254788,0.022863293,0.00027288933,0.0003232127,0.0007664765,0.0010076244,0.013603955],"study_design_scores_gemma":[0.0000015986709,0.00003697271,0.9689998,0.000054566823,0.00001813593,0.000040603092,0.027358111,0.00036695675,0.00016163546,0.00009592726,0.0028490603,0.000016615013],"about_ca_topic_score_codex":0.75996035,"about_ca_topic_score_gemma":0.87529415,"teacher_disagreement_score":0.24003965,"about_ca_system_score_codex":0.0084322365,"about_ca_system_score_gemma":0.01426132,"threshold_uncertainty_score":0.48290652},"labels":[],"label_agreement":null},{"id":"W2254606884","doi":"10.3963/jmpm.v3i3.167","title":"3D Boundary Objects in Stakeholder Management: Knowledge Creators for the Project and Collaboration Facilitators","year":2016,"lang":"en","type":"article","venue":"Journal of Modern Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Knowledge management; Praxeology; Stakeholder engagement; Stakeholder; Project stakeholder; Context (archaeology); Citizen journalism; Stakeholder analysis; Project management; Boundary (topology); Stakeholder management; Project management triangle; Process management; Project charter; Computer science; Business; Engineering; Political science; Public relations; Epistemology; World Wide Web; Systems engineering; Geography","score_opus":0.10334435251628749,"score_gpt":0.3724600212141596,"score_spread":0.2691156686978721,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2254606884","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44563618,0.0035589472,0.3338373,0.01822252,0.0003243474,0.00076180045,0.00006856145,0.00033606138,0.1972543],"genre_scores_gemma":[0.96684474,0.0005183916,0.025541909,0.00031838866,0.000026662472,0.00032813547,0.000021015594,0.00006061251,0.0063401503],"study_design_codex":"qualitative","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97696817,0.018151157,0.0005625436,0.000943853,0.0021955383,0.0011787057],"domain_scores_gemma":[0.981612,0.012221683,0.001756856,0.0013177042,0.001265703,0.0018260616],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019306019,0.0006170842,0.00053462863,0.0033491787,0.008433225,0.012263752,0.0014106272,0.004441292,0.0066401726],"category_scores_gemma":[0.02649262,0.0006361266,0.000496915,0.0020650644,0.013145714,0.0136448555,0.013533518,0.0019685172,0.0011838756],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016243929,0.00015401105,0.00880199,0.00053163676,0.000024159486,0.001808352,0.6177343,0.0009899539,0.0044079972,0.2832388,0.0020803257,0.08006606],"study_design_scores_gemma":[0.000078899575,0.0002576465,0.007971243,0.0018125543,0.00005644574,0.002406726,0.61577946,0.007940973,0.0047106897,0.17339087,0.1854309,0.000163616],"about_ca_topic_score_codex":0.002435041,"about_ca_topic_score_gemma":0.00163892,"teacher_disagreement_score":0.019306019,"about_ca_system_score_codex":0.002498467,"about_ca_system_score_gemma":0.006611067,"threshold_uncertainty_score":0.10210121},"labels":[],"label_agreement":null},{"id":"W2262843902","doi":"","title":"The Role of Management Accountant in Preparing Feasibility Studies","year":2007,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Identification (biology); Order (exchange); Production (economics); Accounting; Business; Management accounting; Engineering; Engineering management; Knowledge management; Process management; Computer science; Finance; Economics","score_opus":0.052856856816050984,"score_gpt":0.39156827734946364,"score_spread":0.33871142053341263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2262843902","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5898598,0.002484832,0.19528873,0.059838943,0.006275749,0.012259258,0.0002456611,0.0018144671,0.13193254],"genre_scores_gemma":[0.8335346,0.0008563394,0.1340353,0.005019823,0.00080017815,0.0044405023,0.00021554544,0.00020532213,0.020892393],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.87042594,0.09679957,0.00852908,0.0038058814,0.013875659,0.006563862],"domain_scores_gemma":[0.7531888,0.10641178,0.01977589,0.017765064,0.07631783,0.02654062],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.10626941,0.0008675014,0.0008237856,0.0036516348,0.008564418,0.008270288,0.0024263992,0.002391069,0.012377312],"category_scores_gemma":[0.22551566,0.0010217865,0.00055917667,0.0013753565,0.002247256,0.0064978544,0.003945521,0.0049695796,0.0033894193],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002331722,0.0047520064,0.08022737,0.0016632249,0.00016555724,0.009206252,0.11636504,0.0026245827,0.034682125,0.030323453,0.06337917,0.6542796],"study_design_scores_gemma":[0.00072213437,0.00786271,0.14991164,0.005511559,0.0004150323,0.014371894,0.2521791,0.048976105,0.043385614,0.022384929,0.45288673,0.0013924829],"about_ca_topic_score_codex":0.0020507416,"about_ca_topic_score_gemma":0.0045140805,"teacher_disagreement_score":0.10626941,"about_ca_system_score_codex":0.004132129,"about_ca_system_score_gemma":0.018958585,"threshold_uncertainty_score":0.5620131},"labels":[],"label_agreement":null},{"id":"W2268242053","doi":"","title":"An Index to Assess Project Management Competencies in Managing Design Changes","year":2016,"lang":"en","type":"article","venue":"International Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Brainstorming; Project team; Project management; Project management triangle; OPM3; Project stakeholder; Program management; Knowledge management; Process management; Identification (biology); Engineering; Index (typography); Project manager; Project planning; Engineering management; Operations management; Business; Computer science; Marketing; Systems engineering","score_opus":0.07612372020474947,"score_gpt":0.34657471252553596,"score_spread":0.2704509923207865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2268242053","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90941167,0.0002940671,0.03158706,0.00044482108,0.000060087452,0.00083155086,0.0008840622,0.00025761753,0.056229074],"genre_scores_gemma":[0.9476852,0.00025038753,0.04748023,0.00007808815,0.000025661233,0.0005675456,0.0010269919,0.000027954267,0.0028578485],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99660695,0.0007481747,0.0004678021,0.00012066189,0.0017932601,0.0002631339],"domain_scores_gemma":[0.98310107,0.0070705577,0.0029995267,0.00084191666,0.004536663,0.001450345],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004235694,0.00034294146,0.00031353932,0.0040085376,0.00048358485,0.0011171603,0.0005680795,0.00066066335,0.0028102254],"category_scores_gemma":[0.020522324,0.00014962367,0.0004095659,0.0015618898,0.00045115146,0.0013892654,0.0015750343,0.00063308916,0.0007429761],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004944347,0.0017280885,0.5458489,0.00068863964,0.00015417214,0.00028176175,0.004040214,0.0076019294,0.009259646,0.0051997467,0.009842934,0.41485944],"study_design_scores_gemma":[0.00006433568,0.0018264953,0.92289877,0.0003033592,0.00006405143,0.0008256214,0.005306657,0.031085258,0.0068425117,0.004338815,0.026355935,0.000088310604],"about_ca_topic_score_codex":0.0013370743,"about_ca_topic_score_gemma":0.0018517238,"teacher_disagreement_score":0.004235694,"about_ca_system_score_codex":0.0009544051,"about_ca_system_score_gemma":0.0013040073,"threshold_uncertainty_score":0.022400796},"labels":[],"label_agreement":null},{"id":"W2274886797","doi":"10.1061/(asce)co.1943-7862.0001064","title":"In Memoriam: Edward F. Reese, P.E. Founding Member of the Construction Institute","year":2015,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Brantford Energy (Canada)","funders":"","keywords":"Art; Theology; Philosophy","score_opus":0.06253674921359659,"score_gpt":0.31723746766532995,"score_spread":0.25470071845173337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2274886797","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00029015442,0.006472653,0.0006961565,0.43852672,0.5480387,0.000051178195,0.00038173885,0.000212517,0.005330249],"genre_scores_gemma":[0.008817772,0.011120959,0.0018108517,0.29263464,0.46102357,0.00020527473,0.0006468738,0.0003311117,0.22340895],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979048,0.0002649504,0.00018819302,0.00035874595,0.001123207,0.00016010409],"domain_scores_gemma":[0.97680366,0.002712602,0.0011655145,0.0005391585,0.015747702,0.0030314913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038553763,0.0014503635,0.0016778184,0.0010483954,0.002996737,0.005754572,0.0023688222,0.004303264,0.021805763],"category_scores_gemma":[0.025601277,0.0005399642,0.0009419831,0.000688504,0.001635958,0.0034224943,0.0025675308,0.014918986,0.024154874],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007774746,0.0000030309143,0.000039298782,0.000016667549,0.0000019599347,0.000038619106,0.00002124453,0.0000103734055,0.00001963288,0.00013361925,0.9970516,0.002656068],"study_design_scores_gemma":[0.000008177775,0.000014534649,0.00032825183,0.000105602805,0.000008315981,0.00023576939,0.00021752992,0.000070410664,0.00008864452,0.000505226,0.99840397,0.000013555434],"about_ca_topic_score_codex":0.007243674,"about_ca_topic_score_gemma":0.013533531,"teacher_disagreement_score":0.021805763,"about_ca_system_score_codex":0.0026620468,"about_ca_system_score_gemma":0.005159829,"threshold_uncertainty_score":0.07294756},"labels":[],"label_agreement":null},{"id":"W2278777272","doi":"10.14288/1.0076488","title":"Culture and organizational culture in the construction industry : a literature review","year":2015,"lang":"en","type":"review","venue":"cIRcle (University of British Columbia)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Context (archaeology); Cultural diversity; Ethnic group; Organizational culture; Public relations; Productivity; Construction industry; Business; Political science; Sociology; Engineering; Economic growth; Economics","score_opus":0.04209320781832695,"score_gpt":0.2895656405701556,"score_spread":0.24747243275182865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2278777272","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000988619,0.9972301,0.0001239198,0.0005850482,0.00009850048,0.000010940585,0.000019095372,0.000001963841,0.0009417586],"genre_scores_gemma":[0.005166157,0.9942719,0.00020830943,0.00016747665,0.000063025866,0.000013028343,0.000018335224,0.0000011617242,0.00009065102],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99803215,0.000684916,0.00044212263,0.00019167905,0.0005366659,0.000112415786],"domain_scores_gemma":[0.9844467,0.011975104,0.0014868102,0.00012876364,0.0016797486,0.00028294485],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003165085,0.0007950989,0.001536394,0.01049471,0.0011895971,0.004529627,0.0010215684,0.0018081468,0.002423111],"category_scores_gemma":[0.007125854,0.00063117035,0.00096079125,0.017309736,0.0015565167,0.0042153858,0.0012899062,0.0014352192,0.00040013803],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008501553,0.00017730995,0.008204795,0.14708254,0.00045709024,0.0009158419,0.006242141,0.00074525404,0.00036973567,0.012049426,0.017406087,0.8062647],"study_design_scores_gemma":[0.000020455325,0.00019405225,0.054809008,0.44545177,0.001530856,0.003689347,0.018086916,0.00054976065,0.00039587016,0.0064389394,0.4686891,0.00014392483],"about_ca_topic_score_codex":0.015796952,"about_ca_topic_score_gemma":0.027011557,"teacher_disagreement_score":0.015796952,"about_ca_system_score_codex":0.003273376,"about_ca_system_score_gemma":0.008632095,"threshold_uncertainty_score":0.03141004},"labels":[],"label_agreement":null},{"id":"W2285938779","doi":"","title":"A Theoretical Framework to Enhance the Conversion Process in Convertible Contracts","year":2015,"lang":"en","type":"article","venue":"International Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Convertible; Convertible bond; Procurement; Process (computing); Business; Risk analysis (engineering); Operations management; Engineering; Computer science; Finance; Marketing; Bond","score_opus":0.020187802086992356,"score_gpt":0.3493968680678115,"score_spread":0.32920906598081917,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2285938779","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025064657,0.00087350974,0.7861758,0.011627541,0.00013939649,0.00073036586,0.00008852125,0.000094876115,0.17520538],"genre_scores_gemma":[0.59914833,0.0009985066,0.39144078,0.00093268976,0.00006983268,0.0009653026,0.00008417598,0.00004409348,0.006316313],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99082255,0.0063552023,0.00033956222,0.0006303794,0.0013202728,0.0005319885],"domain_scores_gemma":[0.9880143,0.008818318,0.0008779065,0.00072955986,0.0011831416,0.00037679184],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015230724,0.00083579554,0.00046687186,0.0032672675,0.00341329,0.0070185284,0.0025215824,0.0028229202,0.006935281],"category_scores_gemma":[0.013072624,0.0006025746,0.0011359049,0.0031016513,0.015723724,0.009834944,0.002762643,0.0044558235,0.00065298675],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002270508,0.00002673467,0.00007891822,0.000023903085,0.0000013783335,0.000028778011,0.000860701,0.0011371291,0.000044418983,0.9951835,0.00017172103,0.0024405026],"study_design_scores_gemma":[0.000043687938,0.000062346335,0.0003235928,0.0003418631,0.000012873159,0.00011893704,0.0034919456,0.016569072,0.00046606027,0.9434591,0.03508245,0.000028063345],"about_ca_topic_score_codex":0.004444652,"about_ca_topic_score_gemma":0.004261155,"teacher_disagreement_score":0.015230724,"about_ca_system_score_codex":0.0076380773,"about_ca_system_score_gemma":0.008609672,"threshold_uncertainty_score":0.08054876},"labels":[],"label_agreement":null},{"id":"W2288320378","doi":"","title":"Fuzzy Complexity Analysis with Conflict Resolution for Educational Projects","year":2012,"lang":"en","type":"article","venue":"DOAJ (DOAJ: Directory of Open Access Journals)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SR Research (Canada)","funders":"","keywords":"Engineering economics; Conflict resolution; Flexible manufacturing system; Resolution (logic); Fuzzy logic; Computer science; Conflict analysis; Management science; Engineering management; Engineering; Artificial intelligence; Knowledge management; Industrial engineering; Systems engineering; Sociology; Operations management; Business; Social science","score_opus":0.6522697563859722,"score_gpt":0.6336756850540574,"score_spread":0.01859407133191482,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2288320378","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.042887937,0.00021056435,0.9525538,0.00029408006,0.000022608201,0.00012539458,0.0000496511,0.00005386996,0.003802047],"genre_scores_gemma":[0.8018816,0.0002665284,0.19567692,0.00004736676,0.000055789547,0.00033796983,0.00010774895,0.000021859776,0.0016040949],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9935829,0.0038731406,0.00027124948,0.0004902236,0.0014114004,0.00037107227],"domain_scores_gemma":[0.98980707,0.0073153605,0.0013516025,0.00035637108,0.00082610693,0.00034352436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0058128377,0.0009449305,0.0010152062,0.0046789013,0.00118053,0.003067713,0.001428879,0.0013510224,0.0022591485],"category_scores_gemma":[0.015511072,0.0004862876,0.0022066368,0.003158273,0.0026844903,0.004408838,0.0022518772,0.0014489968,0.00016722248],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000090941474,0.00006847041,0.0018724824,0.00012315028,0.00012842416,0.00025342658,0.0005825941,0.7232829,0.00079478556,0.24352589,0.0005329235,0.028743949],"study_design_scores_gemma":[0.000009022111,0.00002451449,0.00034527233,0.000013176359,0.000015432135,0.000032522228,0.00013563651,0.9399858,0.00015994467,0.058779363,0.00047961698,0.000019661988],"about_ca_topic_score_codex":0.006779152,"about_ca_topic_score_gemma":0.003262276,"teacher_disagreement_score":0.006779152,"about_ca_system_score_codex":0.0041227955,"about_ca_system_score_gemma":0.0018181155,"threshold_uncertainty_score":0.030741572},"labels":[],"label_agreement":null},{"id":"W2290160362","doi":"10.14288/1.0076457","title":"Governmental dust control in construction industry : a study of policies","year":2015,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Business; Control (management); Dust control; Environmental planning; Environmental science; Economics; Engineering; Waste management","score_opus":0.042244795215033354,"score_gpt":0.25706015475174865,"score_spread":0.2148153595367153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2290160362","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97978175,0.0004417719,0.00031568462,0.0024313068,0.000007822484,0.000026788215,0.00003602779,0.000003913516,0.016954985],"genre_scores_gemma":[0.9990534,0.00030397062,0.000077331715,0.00009844032,0.000004452476,0.000013687166,0.00001680807,0.0000016496457,0.00043025534],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99446845,0.0030848205,0.00020958378,0.00024676597,0.00078280683,0.0012076258],"domain_scores_gemma":[0.9766432,0.01466775,0.004991414,0.000502843,0.0020294155,0.001165463],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0050433083,0.00011194529,0.00023391137,0.0019483597,0.0021625175,0.00424911,0.0005345102,0.00092522264,0.0015135205],"category_scores_gemma":[0.016763516,0.0001858692,0.00017484967,0.0037197128,0.0036239093,0.0022435712,0.0014752075,0.0012198793,0.00011845881],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000297218,0.0012673812,0.6011519,0.0004607035,0.00014485858,0.00066459534,0.13306643,0.006029184,0.0013916898,0.18884607,0.0046239067,0.062056027],"study_design_scores_gemma":[0.000043264114,0.00024232717,0.63721204,0.0004360458,0.000083455656,0.000103147984,0.29894006,0.005093038,0.00076804217,0.013920926,0.043105103,0.000052509135],"about_ca_topic_score_codex":0.03892112,"about_ca_topic_score_gemma":0.02991796,"teacher_disagreement_score":0.03892112,"about_ca_system_score_codex":0.0140301455,"about_ca_system_score_gemma":0.011843909,"threshold_uncertainty_score":0.10179627},"labels":[],"label_agreement":null},{"id":"W2290494095","doi":"10.14288/1.0076367","title":"A multi-perspective assessment method for measuring leading indicatiors in capital project benchmarking","year":2015,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Benchmarking; Perspective (graphical); Capital (architecture); Computer science; Business; Artificial intelligence; Geography; Marketing","score_opus":0.11092497610725911,"score_gpt":0.35057462460870653,"score_spread":0.23964964850144743,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2290494095","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.055230558,0.0003613953,0.9100962,0.00035185996,0.00017553203,0.0009237709,0.0006486614,0.0006503012,0.031561654],"genre_scores_gemma":[0.31873032,0.00024809482,0.67747855,0.00009394328,0.000041707473,0.0013105717,0.000504901,0.00009272581,0.001499165],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9709917,0.016257482,0.0018251073,0.0015032019,0.008800495,0.0006220705],"domain_scores_gemma":[0.9572625,0.020150712,0.0043272753,0.0027069484,0.0146240825,0.0009284876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019782847,0.0010530053,0.00070072914,0.010681234,0.0013466041,0.0037461037,0.0009871456,0.0008430937,0.0034092828],"category_scores_gemma":[0.057150494,0.00036532155,0.0010615592,0.010317976,0.0010452942,0.0045515853,0.0027974995,0.0014481388,0.0008140827],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005281009,0.0004107497,0.06100929,0.0010402137,0.00023921949,0.00024114283,0.009728869,0.01355546,0.013296208,0.08228727,0.0067082155,0.81095535],"study_design_scores_gemma":[0.0003824048,0.0036719579,0.21255885,0.0022598743,0.0006850758,0.0013509803,0.02820348,0.44523403,0.05187336,0.13228682,0.12032704,0.001166087],"about_ca_topic_score_codex":0.0027639277,"about_ca_topic_score_gemma":0.004726996,"teacher_disagreement_score":0.019782847,"about_ca_system_score_codex":0.0023136684,"about_ca_system_score_gemma":0.0024970758,"threshold_uncertainty_score":0.1046229},"labels":[],"label_agreement":null},{"id":"W2291662593","doi":"10.1016/j.ijproman.2016.02.010","title":"Projects with internal vs. external customers: An empirical investigation of variation in practice","year":2016,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Variation (astronomy); Context (archaeology); Project management; Business; Knowledge management; Process management; Empirical research; Computer science; Engineering; Systems engineering; Statistics; Mathematics; Geography","score_opus":0.07591680970319234,"score_gpt":0.40456667164646865,"score_spread":0.3286498619432763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2291662593","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99864095,0.000042939944,0.00046900834,0.00003109742,0.0000018978633,0.00002752416,0.000017378301,0.0000026614753,0.0007666021],"genre_scores_gemma":[0.9995647,0.00001771017,0.00023038674,0.000008765724,0.0000020310047,0.00003722937,0.00002643026,0.000003516585,0.000109255125],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9568443,0.030646222,0.0026121766,0.0026673286,0.0057521216,0.0014777587],"domain_scores_gemma":[0.7064259,0.24027044,0.027431842,0.009094867,0.0126524,0.004124506],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020320162,0.00022061035,0.00051505107,0.0029426825,0.0012790669,0.0028292856,0.0015009872,0.001146148,0.0012588432],"category_scores_gemma":[0.1461175,0.00045833734,0.0003975834,0.0037520041,0.0029672678,0.0026097777,0.003896673,0.0010996473,0.00024280768],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028484408,0.0004147282,0.91871285,0.00007536238,0.00014037367,0.00025924348,0.059642006,0.00049070857,0.000663127,0.0012252037,0.00022943418,0.017862177],"study_design_scores_gemma":[0.000028907114,0.0005883589,0.93099195,0.00006628032,0.000051552506,0.00042352284,0.062802166,0.002565891,0.00032884147,0.0009373371,0.0011727938,0.000042429885],"about_ca_topic_score_codex":0.0031299696,"about_ca_topic_score_gemma":0.0058359317,"teacher_disagreement_score":0.020320162,"about_ca_system_score_codex":0.00196164,"about_ca_system_score_gemma":0.0016126535,"threshold_uncertainty_score":0.10746455},"labels":[],"label_agreement":null},{"id":"W2294323942","doi":"10.14288/1.0165662","title":"Case study : assessment of innovation on a P3 project process perspective","year":2013,"lang":"en","type":"article","venue":"Open Collections","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Perspective (graphical); Process (computing); Process management; Knowledge management; Computer science; Engineering; Artificial intelligence","score_opus":0.1863335136524498,"score_gpt":0.49031058751172835,"score_spread":0.3039770738592785,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2294323942","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82580835,0.0002501263,0.07701109,0.0016809021,0.000050936473,0.0022969611,0.000417847,0.00016355354,0.09232024],"genre_scores_gemma":[0.9582429,0.0002593095,0.035432346,0.00008048738,0.000014892359,0.000605825,0.00014526259,0.000027153366,0.0051917746],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9906019,0.005257342,0.00042941494,0.0005005317,0.002325822,0.0008849436],"domain_scores_gemma":[0.981069,0.012700777,0.001075215,0.0014089913,0.0026267802,0.0011191776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0089190975,0.00051700306,0.00034316306,0.0028545542,0.00296918,0.004741965,0.0013558128,0.0023062539,0.0039611],"category_scores_gemma":[0.013958059,0.0002789483,0.00070273876,0.0043571787,0.0031094044,0.003793176,0.0032847857,0.0017114809,0.0006886294],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016575848,0.0057060774,0.07655882,0.0025262397,0.00011115158,0.023180123,0.1720919,0.05217945,0.018678246,0.28690565,0.011233635,0.34917116],"study_design_scores_gemma":[0.00041798447,0.008622671,0.087403975,0.0020154347,0.00017629121,0.012706686,0.40112054,0.13855791,0.055136073,0.06197491,0.23149095,0.00037655502],"about_ca_topic_score_codex":0.004545546,"about_ca_topic_score_gemma":0.005142145,"teacher_disagreement_score":0.0089190975,"about_ca_system_score_codex":0.0041968776,"about_ca_system_score_gemma":0.00487744,"threshold_uncertainty_score":0.047169328},"labels":[],"label_agreement":null},{"id":"W2296568242","doi":"10.1139/cjce-2015-0434","title":"Total float management: computerized technique for construction delay analysis","year":2016,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"King Abdulaziz City for Science and Technology","keywords":"Software; Computer science; Schedule; Float (project management); Retard; Static timing analysis; Software engineering; Real-time computing; Systems engineering; Embedded system; Engineering; Operating system","score_opus":0.02147326769624481,"score_gpt":0.25816491526869606,"score_spread":0.23669164757245126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2296568242","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010607242,0.0001379302,0.96732795,0.00007231737,0.00004666957,0.00011121638,0.0004904353,0.015636712,0.005569542],"genre_scores_gemma":[0.21078965,0.00039048918,0.77396,0.00006757354,0.00005547703,0.00036404398,0.0010348621,0.0023787431,0.010959173],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938273,0.00006769903,0.00003854337,0.00012016861,0.00035375747,0.000037002166],"domain_scores_gemma":[0.9985298,0.00055197894,0.0002298716,0.00022628189,0.0004240322,0.00003809908],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007142489,0.0008358461,0.000347242,0.0024007633,0.00043602777,0.0009014253,0.0010339539,0.0003585935,0.012998064],"category_scores_gemma":[0.0025672026,0.00044771173,0.00042389947,0.0019155444,0.00032670944,0.0012772772,0.00062989094,0.0005800157,0.0021363127],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021355832,0.00008603015,0.006490709,0.00041381322,0.00006974912,0.00018635453,0.00061055564,0.03523531,0.045225803,0.014627435,0.019090584,0.87775004],"study_design_scores_gemma":[0.0001320819,0.00041552162,0.015401795,0.00022895212,0.00016228188,0.0014121329,0.00045759324,0.6472518,0.118427016,0.01836323,0.19750273,0.00024494535],"about_ca_topic_score_codex":0.004153981,"about_ca_topic_score_gemma":0.005249702,"teacher_disagreement_score":0.012998064,"about_ca_system_score_codex":0.0006443036,"about_ca_system_score_gemma":0.0015092965,"threshold_uncertainty_score":0.0434829},"labels":[],"label_agreement":null},{"id":"W2297660452","doi":"10.17159/2222-3436/2016/v19n1a7","title":"Comparing the power and influence of functional managers with that of project managers in matrix organisations: The challenge in duality of command","year":2016,"lang":"en","type":"article","venue":"South African Journal of Economic and Management Sciences","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Functional manager; Project manager; Business; Ambiguity; Perception; Phase (matter); Public relations; Project management; Project sponsorship; Knowledge management; Marketing; Process management; Project management triangle; Psychology; Management; Project charter; Political science; Computer science","score_opus":0.09220294742928917,"score_gpt":0.31568914197545334,"score_spread":0.22348619454616417,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2297660452","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99543935,0.0000839034,0.0007150633,0.00024570062,0.000006632942,0.000010313696,0.0000029788948,0.0000022585555,0.0034937654],"genre_scores_gemma":[0.99971706,0.0000241964,0.000069436035,0.000018462239,0.0000034901034,0.0000046120977,0.0000018561695,0.000001175204,0.00015975125],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99047405,0.0061373017,0.00026454177,0.0003832855,0.0016696404,0.0010712452],"domain_scores_gemma":[0.9731621,0.015373178,0.004686927,0.00080704316,0.0022653316,0.003705388],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00938999,0.0002243263,0.000250895,0.0019526287,0.00197808,0.003369039,0.00050202006,0.0004086905,0.001804937],"category_scores_gemma":[0.034919303,0.00024137474,0.00017872931,0.0007089205,0.0041303597,0.0021191593,0.0033581823,0.00067961746,0.00017497908],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007420993,0.0003207514,0.60717225,0.00015539411,0.00010072151,0.0004913385,0.30813384,0.000453652,0.003952997,0.011828564,0.0006727115,0.065975785],"study_design_scores_gemma":[0.000049977156,0.0007347992,0.67139226,0.0001224671,0.000036200312,0.00027937,0.31428066,0.0015760821,0.001020263,0.0044497685,0.006012102,0.000046170557],"about_ca_topic_score_codex":0.0033993123,"about_ca_topic_score_gemma":0.004560181,"teacher_disagreement_score":0.00938999,"about_ca_system_score_codex":0.0015175756,"about_ca_system_score_gemma":0.0015558181,"threshold_uncertainty_score":0.04965967},"labels":[],"label_agreement":null},{"id":"W2301301547","doi":"10.5040/9781472560070.ch-009","title":"Defective Structures and Economic Loss in the United States: Law and Policy","year":2014,"lang":"en","type":"book-chapter","venue":"Hart Publishing eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Law; Political science; Law and economics; Economics","score_opus":0.05558962566796299,"score_gpt":0.3098330936830973,"score_spread":0.2542434680151343,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2301301547","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032431588,0.13270678,0.002390312,0.12517089,0.0015816145,0.000041400617,0.0003838856,0.00011030019,0.7051832],"genre_scores_gemma":[0.5337373,0.18421128,0.0028195882,0.044528432,0.0020168722,0.00015422811,0.0005684332,0.000097304415,0.23186652],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99882776,0.00032087395,0.000066300374,0.00014660043,0.0003875284,0.0002509271],"domain_scores_gemma":[0.99840975,0.000986774,0.00017379923,0.000072772775,0.00021833197,0.00013865482],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020158112,0.000295355,0.00031771438,0.0018783209,0.0036430224,0.008122692,0.0012302358,0.0057112123,0.012187454],"category_scores_gemma":[0.003004283,0.0004548565,0.0003589234,0.002454975,0.006614039,0.0044824844,0.0029090869,0.004249568,0.0009453303],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014098092,0.00007165066,0.0011048721,0.00008107817,0.0000044897033,0.00014288137,0.0010805131,0.00079197704,0.00007842973,0.87375134,0.07575428,0.047124412],"study_design_scores_gemma":[0.000010948656,0.000043826007,0.005500665,0.0011886107,0.000018663764,0.00018621176,0.0023507203,0.0010073687,0.00019362442,0.17014574,0.8192995,0.000054060427],"about_ca_topic_score_codex":0.08737268,"about_ca_topic_score_gemma":0.09153205,"teacher_disagreement_score":0.08737268,"about_ca_system_score_codex":0.010343662,"about_ca_system_score_gemma":0.008005717,"threshold_uncertainty_score":0.17372823},"labels":[],"label_agreement":null},{"id":"W2307129039","doi":"10.3963/jmpm.v3i3.161","title":"Project Management for a Plant Implementation: Success or failure?","year":2016,"lang":"en","type":"article","venue":"Le dépôt institutionnel (Université du Québec à Trois-Rivières)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Project management; Process management; Strengths and weaknesses; Project management triangle; OPM3; Audit; Project planning; Project manager; Project charter; Program management; Closing (real estate); Extreme project management; Business; Engineering management; Operations management; Computer science; Engineering; Accounting; Systems engineering","score_opus":0.0413515351959972,"score_gpt":0.2865225512190191,"score_spread":0.24517101602302188,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2307129039","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.648057,0.01086325,0.04688045,0.17181335,0.0019247391,0.0015833016,0.0002317439,0.0019476602,0.11669852],"genre_scores_gemma":[0.97229475,0.0024100798,0.012534974,0.0029680429,0.0002843059,0.00041098637,0.000104196646,0.0002066656,0.008786061],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.96266156,0.018251274,0.0020660032,0.0013224928,0.012763959,0.0029347127],"domain_scores_gemma":[0.9347405,0.02103845,0.012787508,0.0040144334,0.017789628,0.009629514],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.032733012,0.0005773814,0.00046666787,0.0017004263,0.0028351278,0.0053083594,0.0024563905,0.0024350665,0.006427506],"category_scores_gemma":[0.09531252,0.00033260396,0.0004260663,0.0017925373,0.0034558135,0.0053202338,0.0038727578,0.0035517819,0.0022279941],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018031617,0.0009779617,0.086029,0.0024541058,0.00015459987,0.0025984864,0.036961623,0.0013993032,0.0023491695,0.015117994,0.065290906,0.78648657],"study_design_scores_gemma":[0.000173905,0.0062911287,0.26451573,0.009150959,0.00019638134,0.012748682,0.2167586,0.00971018,0.0074138637,0.026405845,0.44608918,0.0005454525],"about_ca_topic_score_codex":0.0022229576,"about_ca_topic_score_gemma":0.0021290428,"teacher_disagreement_score":0.99777704,"about_ca_system_score_codex":0.002325604,"about_ca_system_score_gemma":0.006858297,"threshold_uncertainty_score":0.17311078},"labels":[],"label_agreement":null},{"id":"W2310166012","doi":"10.1177/875697280203300204","title":"Selling Project Management to Senior Executives: The Case for Avoiding Crisis Sales","year":2002,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; Athabasca University","funders":"","keywords":"Business; Project management; Senior management; Marketing; Public relations; Process management; Management; Economics; Political science","score_opus":0.1526125747468498,"score_gpt":0.3865421843934898,"score_spread":0.23392960964664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2310166012","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5513856,0.0018559742,0.005936068,0.3012453,0.00058987713,0.00019561067,0.000018966604,0.00012040758,0.13865225],"genre_scores_gemma":[0.9857255,0.00055437087,0.0024092947,0.0054218206,0.00017551986,0.000075829426,0.0000073510173,0.00003424445,0.0055959234],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9854476,0.008120558,0.000240286,0.00058950786,0.0016211814,0.0039809635],"domain_scores_gemma":[0.96245307,0.015896596,0.0036662836,0.0020138414,0.0042930166,0.011677227],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020533388,0.00050839345,0.0006079493,0.0014670423,0.019271944,0.01591509,0.0030284224,0.009935467,0.0099975495],"category_scores_gemma":[0.050318122,0.0005524776,0.0004447478,0.0011988379,0.009993732,0.008003611,0.006115595,0.010533648,0.0012161001],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000726391,0.0023372301,0.043663375,0.0009297063,0.00015156226,0.013651587,0.22504665,0.0024038274,0.0026983537,0.24028736,0.14103827,0.32706574],"study_design_scores_gemma":[0.00036321892,0.0015407315,0.036726493,0.0016954812,0.00009215192,0.006604891,0.47439778,0.004241649,0.0016174477,0.13994157,0.33254668,0.00023192266],"about_ca_topic_score_codex":0.0042179865,"about_ca_topic_score_gemma":0.006570409,"teacher_disagreement_score":0.020533388,"about_ca_system_score_codex":0.0036296784,"about_ca_system_score_gemma":0.009354016,"threshold_uncertainty_score":0.10859221},"labels":[],"label_agreement":null},{"id":"W2312521449","doi":"10.1061/41002(328)41","title":"A Model to Predict the Impact of Excusable and Non-Excusable Delay on Selected Construction Projects","year":2008,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Damages; Postponement; Pre-construction services; Construction management; Schedule; Process (computing); Quality (philosophy); Business; Project planning; Project management; Risk analysis (engineering); Operations management; Engineering; Computer science; Civil engineering","score_opus":0.09386223567393061,"score_gpt":0.3484582378382545,"score_spread":0.25459600216432393,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2312521449","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9272273,0.00049883744,0.053249095,0.0010185177,0.00015956123,0.00023206836,0.0051629725,0.001318845,0.011132644],"genre_scores_gemma":[0.98596096,0.00022483729,0.005516805,0.000049618036,0.000015027906,0.00017624069,0.0018321606,0.000044130567,0.0061802263],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996662,0.00006433226,0.000019401748,0.00007941974,0.00005088586,0.00011974812],"domain_scores_gemma":[0.99739516,0.0015681838,0.00027531397,0.000054891498,0.0004983794,0.00020796596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001438993,0.0014925537,0.00073595496,0.0015610006,0.00074563595,0.002251572,0.0013770144,0.002133862,0.008774496],"category_scores_gemma":[0.0035568771,0.00068627996,0.001023291,0.00092999125,0.00045903627,0.0011176942,0.00067671586,0.0017457645,0.0011348163],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000095496645,0.000074807,0.0061530545,0.000019929887,0.000015960599,0.00007279003,0.000012200116,0.9904518,0.00025906277,0.00045909133,0.0005294101,0.0018564267],"study_design_scores_gemma":[0.000013823711,0.00003811927,0.0010579107,0.0000042777283,0.000010467995,0.000008720019,0.000014558953,0.99836284,0.00008679932,0.0002555489,0.00014138722,0.00000550763],"about_ca_topic_score_codex":0.074253246,"about_ca_topic_score_gemma":0.030535646,"teacher_disagreement_score":0.074253246,"about_ca_system_score_codex":0.0025163672,"about_ca_system_score_gemma":0.0020561735,"threshold_uncertainty_score":0.14764214},"labels":[],"label_agreement":null},{"id":"W2316965743","doi":"","title":"Analysis and Evaluation on the Risks of the Construction Project ANALYSES ET ÉVALUATION SUR LES RIQUES DU PROJET DE CONSTRUCTION","year":2009,"lang":"fr","type":"article","venue":"Canadian social science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Valuation (finance); Normative; Analytic hierarchy process; Risk analysis (engineering); Risk management; Computer science; Operations research; Business; Engineering; Economics; Epistemology; Management; Accounting","score_opus":0.29992983331608547,"score_gpt":0.46156937464613235,"score_spread":0.16163954133004688,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2316965743","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6158295,0.0018238734,0.33528838,0.0020430475,0.00008724649,0.0005628957,0.000138231,0.00015834741,0.044068553],"genre_scores_gemma":[0.9442632,0.0008670207,0.051430773,0.00004477191,0.000034589855,0.00025252925,0.0001009762,0.00002671633,0.0029793635],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.96001136,0.025162676,0.0015433502,0.00079118565,0.011760251,0.0007312126],"domain_scores_gemma":[0.95248836,0.029995851,0.0034311034,0.0018514427,0.0117280455,0.00050518406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.029356947,0.0007753352,0.0005569564,0.0039453995,0.0011474951,0.0037688552,0.00080085284,0.00080266234,0.0016024002],"category_scores_gemma":[0.05325445,0.00031621524,0.0009869899,0.0022137307,0.001795843,0.003065701,0.0019015833,0.0009818568,0.00019709798],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010620938,0.0006123985,0.07266405,0.00083127565,0.0003426763,0.00043012283,0.015134343,0.12378167,0.008093145,0.26448524,0.0034244943,0.5091385],"study_design_scores_gemma":[0.00011747175,0.0026327083,0.10907021,0.0010720991,0.0005787204,0.0010425585,0.01899358,0.6361972,0.030670667,0.16653591,0.032766733,0.00032219646],"about_ca_topic_score_codex":0.0033517615,"about_ca_topic_score_gemma":0.0024184966,"teacher_disagreement_score":0.029356947,"about_ca_system_score_codex":0.0034218992,"about_ca_system_score_gemma":0.00396374,"threshold_uncertainty_score":0.15525621},"labels":[],"label_agreement":null},{"id":"W2317039213","doi":"10.1061/40475(278)123","title":"Fifty-One Names for Time","year":2000,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Yesterday; Dozen; Quality (philosophy); Snow; Product (mathematics); Computer science; Resource (disambiguation); Process (computing); Value (mathematics); Meteorology; Operations research; History; Business; Geography; Engineering; Mathematics","score_opus":0.0949245522050463,"score_gpt":0.370602312451603,"score_spread":0.2756777602465567,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2317039213","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013403835,0.0038302108,0.006604852,0.017980352,0.018719424,0.00012197095,0.0014245557,0.0019190655,0.9480592],"genre_scores_gemma":[0.024957372,0.0028744272,0.0043922947,0.009582306,0.0028638763,0.00018398614,0.0021428792,0.0020986013,0.9509043],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9945104,0.0011739553,0.00053651,0.00091708964,0.001786744,0.0010752953],"domain_scores_gemma":[0.99312794,0.0007955504,0.00041323082,0.001296183,0.0027472298,0.0016198866],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026664964,0.0012792703,0.0007820596,0.0033833715,0.008183621,0.0124390805,0.0018256857,0.0027111047,0.23797767],"category_scores_gemma":[0.009745142,0.0006373231,0.0010715955,0.0039323242,0.0045221937,0.017304562,0.009153533,0.004983646,0.15330996],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038391754,0.000019026695,0.0003876846,0.00015695124,0.0000053489134,0.00013578917,0.0038748535,0.000038130423,0.000345479,0.17928703,0.768385,0.047326326],"study_design_scores_gemma":[9.904996e-7,0.0000029690411,0.00006612588,0.000030091218,8.443967e-7,0.000057416597,0.00031906733,0.000010202562,0.000031889227,0.001132139,0.9983407,0.0000075783437],"about_ca_topic_score_codex":0.015585893,"about_ca_topic_score_gemma":0.028170558,"teacher_disagreement_score":0.23797767,"about_ca_system_score_codex":0.0051344545,"about_ca_system_score_gemma":0.0052410513,"threshold_uncertainty_score":0.7961146},"labels":[],"label_agreement":null},{"id":"W2319447784","doi":"10.1139/l2012-038","title":"Optimum risk allocation model for construction contracts: fuzzy TOPSIS approach","year":2012,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Risk management; Negotiation; Process (computing); Computer science; Risk analysis (engineering); TOPSIS; Set (abstract data type); Fuzzy set; Operations research; Fuzzy logic; Management science; Engineering; Business; Artificial intelligence","score_opus":0.04814154988124845,"score_gpt":0.2722476655642158,"score_spread":0.22410611568296737,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2319447784","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0128778145,0.00021018094,0.97664684,0.000295811,0.000019911005,0.00013826157,0.00009993323,0.00010928977,0.009602113],"genre_scores_gemma":[0.60533875,0.0007449308,0.38459352,0.00009632915,0.00002973434,0.0008014782,0.00023854568,0.00004315541,0.008113609],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998061,0.0007862951,0.00010012049,0.00021588396,0.0006688696,0.00016776638],"domain_scores_gemma":[0.99945205,0.00029381097,0.00006623403,0.000019663263,0.00014353808,0.000024677374],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023512635,0.0009293885,0.0012919988,0.0018519829,0.0011380982,0.0034137846,0.0022686159,0.0022215026,0.0058679916],"category_scores_gemma":[0.0026063467,0.0006573573,0.0016213345,0.0019647577,0.0008805064,0.0023148584,0.0013541412,0.0011903787,0.0005926845],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046464647,0.00004275714,0.00027261145,0.00013200683,0.0000517356,0.00012806503,0.00027742464,0.9197064,0.0012462614,0.057220615,0.0008527623,0.020022905],"study_design_scores_gemma":[0.000011116672,0.000022344844,0.000067113884,0.00001566599,0.0000135637465,0.00002551365,0.00006853863,0.9795319,0.00017184972,0.019347692,0.00071347004,0.000011254042],"about_ca_topic_score_codex":0.01187156,"about_ca_topic_score_gemma":0.010331258,"teacher_disagreement_score":0.01187156,"about_ca_system_score_codex":0.002701577,"about_ca_system_score_gemma":0.0033617124,"threshold_uncertainty_score":0.02360487},"labels":[],"label_agreement":null},{"id":"W2319531305","doi":"10.1061/9780784479360.043","title":"Fast Track Relief to Midland’s Emergency Thirst","year":2015,"lang":"en","type":"article","venue":"Pipelines 2015","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Smiths Detection (Canada)","funders":"","keywords":"Schedule; Track (disk drive); Project management; Integrated project delivery; Computer science; Delivery system; Engineering management; Transport engineering; Operations management; Engineering; Systems engineering; Operating system","score_opus":0.17658261488821503,"score_gpt":0.4181425663653972,"score_spread":0.24155995147718218,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2319531305","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18348262,0.0050520627,0.020318037,0.13126278,0.0070873047,0.0008228167,0.003518254,0.0022965998,0.64615947],"genre_scores_gemma":[0.6451119,0.0045762644,0.023759931,0.009385659,0.0009482253,0.00031383126,0.0025276414,0.00032022406,0.31305644],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996113,0.00006776736,0.000010159071,0.00003575976,0.00009249116,0.00018252677],"domain_scores_gemma":[0.9989454,0.0000743915,0.00007873601,0.0000453819,0.00018659799,0.0006695178],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010204668,0.00034124788,0.00018155134,0.0005082306,0.001967107,0.0025922626,0.00067016366,0.0008691227,0.053166937],"category_scores_gemma":[0.0019166898,0.00014050932,0.00019587162,0.00036970346,0.00041977633,0.001062686,0.0024576518,0.0015765866,0.004802144],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016844583,0.0003003078,0.009541327,0.00022151673,0.00002403263,0.0009330793,0.0011675543,0.0011787895,0.0014105976,0.01684054,0.6722094,0.2960044],"study_design_scores_gemma":[0.000033151522,0.00033487356,0.013178926,0.00023347787,0.000008640646,0.00047161576,0.006265245,0.0016067993,0.0005217573,0.0040219547,0.973304,0.000019608631],"about_ca_topic_score_codex":0.0037790167,"about_ca_topic_score_gemma":0.016075058,"teacher_disagreement_score":0.053166937,"about_ca_system_score_codex":0.0009715521,"about_ca_system_score_gemma":0.0040592565,"threshold_uncertainty_score":0.17786115},"labels":[],"label_agreement":null},{"id":"W2323149085","doi":"10.1061/40652(2003)16","title":"Knowledge-Based Management of Economic Risks in Large Infrastructure Projects","year":2002,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Schema (genetic algorithms); Computer science; Risk management; Knowledge management; Process (computing); Risk analysis (engineering); Management science; Process management; Business; Engineering","score_opus":0.1237824893391736,"score_gpt":0.37722912581356394,"score_spread":0.25344663647439036,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2323149085","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20241041,0.0031748519,0.70696276,0.011892889,0.0001355011,0.0005360113,0.00020762226,0.00034419712,0.07433569],"genre_scores_gemma":[0.9078101,0.0016831203,0.08819148,0.00010611308,0.00006060909,0.0001651764,0.00012304897,0.000016788823,0.0018435918],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99428964,0.0032900134,0.00039464518,0.00042927932,0.0011965003,0.00039979097],"domain_scores_gemma":[0.9874548,0.0070712822,0.002556839,0.0010621736,0.0013161623,0.00053879654],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008681808,0.0005974088,0.0006336557,0.0026265976,0.0018492972,0.0072957156,0.0022837569,0.0019180704,0.0020151224],"category_scores_gemma":[0.022495352,0.00036998905,0.0006317433,0.002240058,0.0029912016,0.008434609,0.0049953666,0.0014871306,0.00025056585],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001487614,0.00038058448,0.010299068,0.0003963488,0.00013061186,0.0011551856,0.00445409,0.3457983,0.0011469477,0.3608906,0.002721408,0.27247813],"study_design_scores_gemma":[0.00005842598,0.00015069172,0.0056060897,0.00037650715,0.0000903058,0.00033372213,0.005724313,0.34934223,0.0016803533,0.6152299,0.021257913,0.00014954968],"about_ca_topic_score_codex":0.00537528,"about_ca_topic_score_gemma":0.0060580927,"teacher_disagreement_score":0.008681808,"about_ca_system_score_codex":0.0033100576,"about_ca_system_score_gemma":0.0041546295,"threshold_uncertainty_score":0.045914292},"labels":[],"label_agreement":null},{"id":"W2323475714","doi":"10.1061/40475(278)49","title":"Sustainable Management for Highway Construction","year":2000,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Sustainability; Road construction; Aggregate (composite); Transport engineering; Non-renewable resource; Environmental economics; Business; Engineering; Renewable energy; Economics","score_opus":0.04179872735255683,"score_gpt":0.334096504278659,"score_spread":0.29229777692610215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2323475714","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017999722,0.03405565,0.091392,0.13967294,0.0018496981,0.00042106846,0.0006092105,0.00032336666,0.71367645],"genre_scores_gemma":[0.53008646,0.050046574,0.11883112,0.008277372,0.0018000253,0.0007145657,0.0010803329,0.00012912271,0.28903437],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99906737,0.00034993482,0.00003981465,0.00007029181,0.00038119208,0.000091476584],"domain_scores_gemma":[0.99951863,0.00008357447,0.00007536362,0.00003960906,0.00019652324,0.00008626072],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013005524,0.0003907521,0.00017540238,0.0008709843,0.0013196009,0.0026707787,0.0005699902,0.0012521507,0.013635521],"category_scores_gemma":[0.001820935,0.00010329599,0.00019300806,0.0013495062,0.0009294221,0.001234217,0.0013035125,0.0009943438,0.0014778592],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000097583625,0.00008231409,0.0011094422,0.00019823445,0.00001123682,0.0001083105,0.0003061993,0.008152598,0.0005808822,0.61818326,0.11731363,0.25394407],"study_design_scores_gemma":[0.0000069774624,0.00005847776,0.0015800497,0.0003871403,0.000006175903,0.000079991696,0.00080845744,0.0058112177,0.00035760703,0.24195173,0.74893427,0.000017916776],"about_ca_topic_score_codex":0.0066839047,"about_ca_topic_score_gemma":0.017753778,"teacher_disagreement_score":0.013635521,"about_ca_system_score_codex":0.0033577273,"about_ca_system_score_gemma":0.006723684,"threshold_uncertainty_score":0.045615375},"labels":[],"label_agreement":null},{"id":"W2328086374","doi":"10.1139/cjce-2013-0499","title":"Enhancing project performance by developing multiple regression analysis and risk analysis models for interface","year":2014,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Canadiana.org; University of Calgary","funders":"","keywords":"Schedule; Interface (matter); Bidding; Scope (computer science); Regression analysis; Project management; Risk analysis (engineering); Computer science; Project manager; Project risk management; Engineering; Operations research; Project management triangle; Systems engineering; Business","score_opus":0.029587435332860942,"score_gpt":0.28078662621866246,"score_spread":0.2511991908858015,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2328086374","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19533467,0.00027275571,0.79614353,0.00075711304,0.000053299456,0.0006879902,0.0005152182,0.0010354215,0.005199963],"genre_scores_gemma":[0.63478804,0.0003887368,0.35880154,0.00009715613,0.000048602134,0.0012796541,0.0009073379,0.00016999457,0.00351893],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98558307,0.01000373,0.0006273613,0.0012515615,0.0018363213,0.0006978752],"domain_scores_gemma":[0.92949164,0.05708114,0.0064306064,0.0017556073,0.0046896734,0.00055128004],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021753144,0.0032650803,0.0013466714,0.0041835587,0.0007144694,0.0029116606,0.0021732696,0.0014143552,0.0034784388],"category_scores_gemma":[0.06019333,0.0009838458,0.0028785437,0.0040521706,0.0005973109,0.0032587333,0.0019145857,0.00330848,0.0011794717],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034848214,0.0014051145,0.11758932,0.00028633364,0.0008617485,0.0001819237,0.0009991963,0.74329644,0.0018883249,0.014558616,0.0027887109,0.11579578],"study_design_scores_gemma":[0.000013522415,0.00021375115,0.005861464,0.000028990073,0.00006884555,0.000023346509,0.00013285546,0.9898003,0.0005282386,0.0026534705,0.0006436015,0.000031513773],"about_ca_topic_score_codex":0.017163029,"about_ca_topic_score_gemma":0.014109826,"teacher_disagreement_score":0.021753144,"about_ca_system_score_codex":0.0025553617,"about_ca_system_score_gemma":0.0031092626,"threshold_uncertainty_score":0.115042984},"labels":[],"label_agreement":null},{"id":"W2331792237","doi":"10.1061/9780784413517.086","title":"Data-driven Approaches to Discovering Knowledge Gaps Related to Factors Affecting Construction Labor Productivity","year":2014,"lang":"en","type":"article","venue":"Construction Research Congress 2014","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","funders":"","keywords":"Productivity; Computer science; Knowledge worker; Data science; Knowledge management; Industrial organization; Business; Engineering; Work (physics); Economics; Economic growth","score_opus":0.3601126053673347,"score_gpt":0.4433819547145444,"score_spread":0.0832693493472097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2331792237","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14224729,0.003264469,0.82857823,0.0042342436,0.0001315952,0.00340531,0.010389259,0.00057638594,0.0071732495],"genre_scores_gemma":[0.33356327,0.0015428691,0.65161484,0.0006500118,0.00007104024,0.004555436,0.0074663875,0.000053084583,0.00048309064],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.94208336,0.035835154,0.0071163797,0.004972781,0.009151322,0.0008410376],"domain_scores_gemma":[0.58562326,0.35390958,0.015790394,0.016929472,0.026375879,0.0013714292],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.061726503,0.001760417,0.002656222,0.026356237,0.0016835813,0.009682188,0.0046177427,0.0025430252,0.001976914],"category_scores_gemma":[0.19558807,0.0013316218,0.0021411884,0.018426737,0.0023623933,0.006743291,0.0051148064,0.0026445617,0.0005167784],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009999364,0.0021052908,0.13130139,0.017265363,0.0019543692,0.0020678616,0.029863704,0.05580557,0.006933256,0.07271785,0.0055267066,0.6734587],"study_design_scores_gemma":[0.00046480238,0.0013614312,0.065339714,0.010818483,0.0015339797,0.0013556916,0.081975915,0.28586203,0.021155218,0.46021506,0.0691909,0.000726815],"about_ca_topic_score_codex":0.007868874,"about_ca_topic_score_gemma":0.009955134,"teacher_disagreement_score":0.061726503,"about_ca_system_score_codex":0.004723688,"about_ca_system_score_gemma":0.0086857565,"threshold_uncertainty_score":0.3264448},"labels":[],"label_agreement":null},{"id":"W2332607151","doi":"10.1061/9780784413517.208","title":"A Framework for Identifying and Measuring Competencies and Performance Indicators for Construction Projects","year":2014,"lang":"en","type":"article","venue":"Construction Research Congress 2014","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","funders":"","keywords":"Performance indicator; Performance measurement; Adaptation (eye); Computer science; Measure (data warehouse); Work (physics); Knowledge management; Process management; Construction management; Construction industry; Set (abstract data type); Performance management; Domain (mathematical analysis); Engineering management; Engineering; Construction engineering; Business; Data mining","score_opus":0.2606410296094066,"score_gpt":0.43785217891674255,"score_spread":0.17721114930733595,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2332607151","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011858225,0.0008150232,0.9726114,0.000827813,0.000064992615,0.0012984633,0.0006088945,0.00029721396,0.011617931],"genre_scores_gemma":[0.104782954,0.00059691427,0.89048916,0.00009410014,0.00001815114,0.00227908,0.00047736388,0.000015114962,0.0012472284],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9925189,0.0036251112,0.0009385286,0.0006962092,0.0019018123,0.0003194913],"domain_scores_gemma":[0.99384683,0.0028099972,0.0010750786,0.00025425252,0.0017598285,0.00025407385],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008660263,0.0020641594,0.0008196232,0.009484199,0.0012546112,0.0033737589,0.0019471935,0.0016726108,0.0017549603],"category_scores_gemma":[0.013704984,0.000559143,0.001431021,0.0062518115,0.0020285076,0.0030935868,0.0022194562,0.0017505959,0.00047426982],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009881784,0.00071639614,0.025016231,0.0015082349,0.00021021612,0.00050336646,0.004486685,0.12161567,0.0035823702,0.54972315,0.010292789,0.28224605],"study_design_scores_gemma":[0.00010765309,0.0009041103,0.040314097,0.0027778717,0.00020394629,0.00079055154,0.0067455983,0.516817,0.0042282618,0.32222933,0.1044301,0.00045146386],"about_ca_topic_score_codex":0.017383084,"about_ca_topic_score_gemma":0.017937763,"teacher_disagreement_score":0.017383084,"about_ca_system_score_codex":0.004215666,"about_ca_system_score_gemma":0.0077969935,"threshold_uncertainty_score":0.045800388},"labels":[],"label_agreement":null},{"id":"W2336794237","doi":"10.1109/rams.2016.7448063","title":"Innovations in supportability engineering using business analysis","year":2016,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Department of National Defence","funders":"","keywords":"Computer science; Systems engineering; Engineering","score_opus":0.1257432059178169,"score_gpt":0.37942572064015634,"score_spread":0.25368251472233944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2336794237","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004726626,0.0029922042,0.92991364,0.0032106682,0.00024365674,0.00016900158,0.00008804672,0.0006465377,0.058009565],"genre_scores_gemma":[0.15964502,0.006279204,0.81324774,0.0007133541,0.0004695617,0.0005926331,0.000349439,0.0006059388,0.01809722],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9881052,0.0051194257,0.0007127082,0.0010724218,0.0044597653,0.0005303484],"domain_scores_gemma":[0.98088914,0.011689977,0.0009735754,0.0030209029,0.0029773372,0.00044917257],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012068717,0.0021404335,0.0010510209,0.0093398215,0.001765867,0.010656869,0.003301104,0.0024157441,0.0058607995],"category_scores_gemma":[0.017497143,0.0011017849,0.0022463398,0.00602264,0.007337636,0.0108244205,0.004351037,0.0040646405,0.0025573606],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014766226,0.00007875482,0.0006532893,0.00033142633,0.000038743874,0.000125469,0.0007072357,0.007350852,0.00055279507,0.85509336,0.0023746837,0.13267855],"study_design_scores_gemma":[0.00001723311,0.0000564985,0.0004746007,0.00043026623,0.00002759345,0.00022665923,0.00088377524,0.04491735,0.0017273743,0.79680693,0.15437724,0.000054504304],"about_ca_topic_score_codex":0.003567491,"about_ca_topic_score_gemma":0.001566671,"teacher_disagreement_score":0.012068717,"about_ca_system_score_codex":0.004844421,"about_ca_system_score_gemma":0.004305972,"threshold_uncertainty_score":0.06382626},"labels":[],"label_agreement":null},{"id":"W2340197128","doi":"10.3846/20294913.2015.1074129","title":"Analysis of project success factors in construction industry","year":2015,"lang":"en","type":"article","venue":"Technological and Economic Development of Economy","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":128,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Petro-Canada","funders":"","keywords":"Scope (computer science); Critical success factor; Schedule; Quality (philosophy); Business; Work (physics); Rank (graph theory); Construction industry; Order (exchange); Test (biology); Operations management; Marketing; Computer science; Process management; Engineering; Construction engineering; Finance","score_opus":0.14868826000561033,"score_gpt":0.34193494650788847,"score_spread":0.19324668650227814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2340197128","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99469274,0.00018036512,0.0016441841,0.00006685071,0.0000044477656,0.000091124086,0.00013332945,0.000010769473,0.003176154],"genre_scores_gemma":[0.99886453,0.0000923772,0.0006497388,0.0000036482968,0.0000027246858,0.000040277333,0.00010060612,0.0000032320484,0.0002427503],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.997017,0.00072336436,0.00029162524,0.00014837965,0.0013619789,0.00045767915],"domain_scores_gemma":[0.9817894,0.009225942,0.0029845366,0.00033277782,0.00409288,0.0015745764],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029942235,0.00041559478,0.00036195063,0.0069093527,0.00065327773,0.0012899799,0.00029031996,0.00029297118,0.002793962],"category_scores_gemma":[0.015504122,0.00020126441,0.0005379556,0.0045883046,0.0005644479,0.000677703,0.0007892686,0.00036093206,0.0003264812],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001935802,0.00021898931,0.93351376,0.00025085086,0.000107231885,0.00041154076,0.0029443065,0.0015818108,0.0012602289,0.0009248177,0.0005783981,0.058014333],"study_design_scores_gemma":[0.000005466185,0.00032152227,0.98618746,0.00008070379,0.0000387887,0.00022773656,0.0072914455,0.0027888233,0.000661523,0.0003367513,0.002035789,0.000023982435],"about_ca_topic_score_codex":0.0035785611,"about_ca_topic_score_gemma":0.0034345002,"teacher_disagreement_score":0.0069093527,"about_ca_system_score_codex":0.0012075492,"about_ca_system_score_gemma":0.002230928,"threshold_uncertainty_score":0.015835166},"labels":[],"label_agreement":null},{"id":"W2345642144","doi":"10.12927/hcq.2016.24614","title":"The Case for Information Brokering During Major Change: The Experience of the Transition Support Office of the McGill University Health Centre","year":2016,"lang":"en","type":"article","venue":"Healthcare Quarterly","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University Health Centre; HEC Montréal","funders":"","keywords":"Context (archaeology); Redevelopment; Function (biology); Public relations; Best practice; Information management; Business; Political science; Knowledge management; Computer science; History","score_opus":0.051438425920878245,"score_gpt":0.3167897999796531,"score_spread":0.26535137405877485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2345642144","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5484723,0.0045955013,0.008479076,0.2910125,0.00075212494,0.00024387655,0.000117313095,0.00015350599,0.14617394],"genre_scores_gemma":[0.98575217,0.0007346857,0.0013453154,0.005172619,0.00012614514,0.000055113145,0.000028348235,0.000054203716,0.0067313258],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9483271,0.034714956,0.000634696,0.0015839098,0.004169055,0.010570255],"domain_scores_gemma":[0.96807575,0.014346095,0.0022849035,0.0012497787,0.0021907615,0.011852777],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020882597,0.00045608042,0.00053643435,0.0016044574,0.03455116,0.02575904,0.0033984855,0.0073081413,0.0057350704],"category_scores_gemma":[0.034183923,0.0007568283,0.00056987634,0.0034208454,0.036198854,0.012724056,0.01715633,0.009159547,0.00068625185],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000083679224,0.00009272398,0.0038669552,0.00007911748,0.000013360525,0.0045417794,0.8862277,0.0002719605,0.00047747997,0.074371725,0.016415909,0.013557594],"study_design_scores_gemma":[0.000056942525,0.00010678231,0.0030267974,0.0002037635,0.00001651296,0.0010860865,0.7359642,0.0005952739,0.0002518016,0.013464448,0.24514957,0.00007787539],"about_ca_topic_score_codex":0.24666892,"about_ca_topic_score_gemma":0.23387192,"teacher_disagreement_score":0.24666892,"about_ca_system_score_codex":0.034699343,"about_ca_system_score_gemma":0.042242553,"threshold_uncertainty_score":0.4904663},"labels":[],"label_agreement":null},{"id":"W2346162655","doi":"10.5539/mas.v10n9p1","title":"Developing Improvement Planning Phase in Project Management Maturity Models","year":2016,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"PDCA; Process management; Maturity (psychological); Prioritization; Successor cardinal; Process (computing); Phase (matter); Operations management; Computer science; Business; Operations research; Quality management; Management system; Engineering; Mathematics; Psychology","score_opus":0.16990640388333259,"score_gpt":0.41273158852197295,"score_spread":0.24282518463864036,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2346162655","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015815742,0.00097034435,0.9525338,0.002582744,0.00011202095,0.0015638631,0.00036470252,0.00060092134,0.025455872],"genre_scores_gemma":[0.18296693,0.0009657016,0.8099088,0.00024254742,0.000024986479,0.0016081003,0.00063472596,0.00007757339,0.003570575],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99350464,0.0037797461,0.00053734775,0.00046542572,0.0014280081,0.0002848957],"domain_scores_gemma":[0.98898697,0.00592872,0.0011761939,0.0007899028,0.0028332528,0.000284843],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012037624,0.0008570155,0.0003885175,0.002506902,0.0009966722,0.004710402,0.0013425632,0.0016483936,0.002921717],"category_scores_gemma":[0.01644715,0.00071734685,0.0010643586,0.0023586676,0.0008897781,0.0059164064,0.001699747,0.0023815506,0.0010576299],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018840529,0.00035051888,0.007562394,0.0016829873,0.00011651055,0.0002218298,0.0048480183,0.09126628,0.0034504249,0.52480435,0.008172937,0.35733527],"study_design_scores_gemma":[0.00015254434,0.00096635835,0.004892789,0.0025323925,0.00021810901,0.00045117296,0.003545966,0.4659023,0.011505244,0.3292663,0.18031712,0.00024973185],"about_ca_topic_score_codex":0.0035106458,"about_ca_topic_score_gemma":0.0044251666,"teacher_disagreement_score":0.012037624,"about_ca_system_score_codex":0.003483383,"about_ca_system_score_gemma":0.007901694,"threshold_uncertainty_score":0.063661754},"labels":[],"label_agreement":null},{"id":"W2346689316","doi":"10.1002/pmj.21560","title":"Iterative Project Processes within Temporary Multi-Organizations in Construction: The Self-, Eco-, Re-Organizing Projects","year":2016,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; Université Laval","funders":"","keywords":"Business; Process management; Knowledge management; Engineering; Computer science","score_opus":0.07978771927395233,"score_gpt":0.3452664113821501,"score_spread":0.26547869210819774,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2346689316","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97733635,0.0002117886,0.010936354,0.00027250507,0.000007770938,0.000114756105,0.000013103815,0.000028603354,0.011078747],"genre_scores_gemma":[0.99745935,0.000040649084,0.0018510032,0.000010111181,0.0000015396279,0.000039788418,0.0000082231545,0.0000054870034,0.00058379676],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9902818,0.0067524486,0.0002867897,0.00043751276,0.0012499574,0.0009915013],"domain_scores_gemma":[0.97976744,0.011644804,0.00288056,0.0019655642,0.0014737808,0.002267864],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010262343,0.00026794558,0.00022275656,0.0014929275,0.0042024176,0.004815263,0.0010362165,0.0011935863,0.0018583216],"category_scores_gemma":[0.022924667,0.00038078212,0.00037784228,0.0013999715,0.00813852,0.004235328,0.0065931156,0.0011323732,0.00030668222],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007493659,0.0014765954,0.21135582,0.0004919394,0.00009797225,0.003572121,0.38237113,0.020610679,0.0066361367,0.17440452,0.0014071435,0.19682655],"study_design_scores_gemma":[0.0002344482,0.0020877514,0.2573296,0.0007727113,0.00011934404,0.0032656789,0.45879737,0.032143164,0.009791991,0.1527413,0.0824391,0.00027748727],"about_ca_topic_score_codex":0.0030302915,"about_ca_topic_score_gemma":0.004693634,"teacher_disagreement_score":0.010262343,"about_ca_system_score_codex":0.0034574117,"about_ca_system_score_gemma":0.004635701,"threshold_uncertainty_score":0.05427307},"labels":[],"label_agreement":null},{"id":"W2363727006","doi":"","title":"Standard System Comparison of Government Investment Projects among China,the United States and Canada","year":2010,"lang":"en","type":"article","venue":"Journal of Engineering Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Standard system; Government (linguistics); Investment (military); Business; Engineering; Political science; Construction engineering; Law","score_opus":0.016448283048736932,"score_gpt":0.26032202010551286,"score_spread":0.24387373705677592,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2363727006","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99054724,0.00011982077,0.0003007629,0.00008673271,0.0000031408058,0.000023886301,0.00044941896,0.000013992984,0.008454882],"genre_scores_gemma":[0.99806637,0.000089255744,0.00023865879,0.000008661542,6.213846e-7,0.000009004363,0.0005353211,0.0000027999706,0.0010493499],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.997813,0.00023407748,0.00013238324,0.00013344268,0.0011869208,0.0005002352],"domain_scores_gemma":[0.9935523,0.00048947247,0.00051334914,0.00015546536,0.0047919247,0.000497556],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015715042,0.00016792808,0.0002589878,0.0055912053,0.0014154305,0.0016295825,0.0005353936,0.00013389501,0.0014433956],"category_scores_gemma":[0.0061234864,0.00012981192,0.00026235735,0.009809785,0.0007862786,0.0005066724,0.0008129966,0.0002551701,0.00006942869],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023172973,0.0000711308,0.8849985,0.00010935632,0.00009679972,0.0001851299,0.0059860577,0.004148226,0.0011384436,0.0191322,0.0033102725,0.08059208],"study_design_scores_gemma":[0.0000069880557,0.000034264114,0.98693895,0.00002110329,0.00002460718,0.000030237457,0.0055924845,0.0033604915,0.00041305096,0.00032196095,0.0032411283,0.000014837671],"about_ca_topic_score_codex":0.93835485,"about_ca_topic_score_gemma":0.9577298,"teacher_disagreement_score":0.97878194,"about_ca_system_score_codex":0.021218056,"about_ca_system_score_gemma":0.030975142,"threshold_uncertainty_score":0.15394849},"labels":[],"label_agreement":null},{"id":"W2364797857","doi":"","title":"Risk Identification and Prevention Strategy in International EPC Projects","year":2010,"lang":"en","type":"article","venue":"Petroleum Engineering Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"","keywords":"Procurement; Bidding; Risk assessment; Risk analysis (engineering); Engineering; Risk management; Identification (biology); Neglect; Business; Engineering management; Operations management; Computer security; Finance; Computer science; Marketing","score_opus":0.023255379554032122,"score_gpt":0.3011941413956326,"score_spread":0.2779387618416005,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2364797857","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53189796,0.002992742,0.18674324,0.008318858,0.00014685358,0.0013991268,0.00012395949,0.0006680811,0.26770923],"genre_scores_gemma":[0.9559933,0.0009843478,0.029166115,0.00022466152,0.000025696903,0.0003404259,0.000077427314,0.00002640532,0.013161641],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9961994,0.0015219755,0.0002140764,0.00030614654,0.0011802871,0.0005780394],"domain_scores_gemma":[0.99721473,0.00060414965,0.0006303034,0.00021297071,0.0008887716,0.00044915095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052006175,0.00069706654,0.00039462734,0.0035065163,0.0021849526,0.0047795004,0.0013879654,0.0014338052,0.003078049],"category_scores_gemma":[0.0061564776,0.0002971083,0.00038120014,0.0015710853,0.0010947208,0.0024168005,0.004173188,0.0012529691,0.00057766074],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004514478,0.0019647146,0.050355162,0.0004715398,0.000097858385,0.0017788905,0.008692971,0.03516118,0.0064782305,0.16573805,0.014031983,0.71477807],"study_design_scores_gemma":[0.0002597225,0.0034103207,0.16069788,0.002476697,0.00054668804,0.00560169,0.072966374,0.23176071,0.040057536,0.2426777,0.23904003,0.00050469424],"about_ca_topic_score_codex":0.0030627702,"about_ca_topic_score_gemma":0.0030857215,"teacher_disagreement_score":0.0052006175,"about_ca_system_score_codex":0.002328046,"about_ca_system_score_gemma":0.0055652335,"threshold_uncertainty_score":0.027503848},"labels":[],"label_agreement":null},{"id":"W2369266189","doi":"","title":"International EPC contract amendments","year":2013,"lang":"en","type":"article","venue":"International Petroleum Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"","keywords":"Contract management; Documentation; Business; Duration (music); Connotation; China; Control (management); Operations management; Finance; Law; Economics; Computer science; Management; Political science; Marketing","score_opus":0.05023499387753542,"score_gpt":0.32691931082700926,"score_spread":0.2766843169494738,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2369266189","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0044369698,0.0010955632,0.01233987,0.0035435364,0.002979197,0.0015855082,0.004138129,0.00076479494,0.96911645],"genre_scores_gemma":[0.09567525,0.0027434549,0.03763202,0.012804247,0.002740926,0.0072498224,0.012349233,0.0009360165,0.82786894],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.95502007,0.007056625,0.005440673,0.003813353,0.023352385,0.005316982],"domain_scores_gemma":[0.9504305,0.009662601,0.0027024061,0.011349897,0.024377247,0.0014774059],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.024084415,0.0013919146,0.0009593263,0.0054544276,0.0049493546,0.010716842,0.0040800385,0.010508455,0.06806248],"category_scores_gemma":[0.07490365,0.0011432698,0.0016933623,0.006586686,0.003979642,0.004984946,0.004670659,0.010328382,0.036593843],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014427703,0.0001943526,0.0011589187,0.00036960252,0.00002185876,0.0006251269,0.0010108934,0.00081179326,0.0017592354,0.55246925,0.38525978,0.05617495],"study_design_scores_gemma":[0.000021117809,0.000048427046,0.0015036812,0.00031567048,0.00001921361,0.00026064768,0.00015798485,0.00031887868,0.0007664595,0.01192069,0.984617,0.00005019903],"about_ca_topic_score_codex":0.01914346,"about_ca_topic_score_gemma":0.011440515,"teacher_disagreement_score":0.06806248,"about_ca_system_score_codex":0.0060560377,"about_ca_system_score_gemma":0.019103559,"threshold_uncertainty_score":0.22769171},"labels":[],"label_agreement":null},{"id":"W2379056845","doi":"","title":"Supervising Mechanism Comparison of Government Project Construction Standards among China,the United States and Canada","year":2010,"lang":"en","type":"article","venue":"Advanced materials research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Government (linguistics); Mechanism (biology); Perfection; Process (computing); Engineering management; Business; Engineering; Construction engineering; Political science; Computer science; Law","score_opus":0.06975671134562945,"score_gpt":0.4248029631681429,"score_spread":0.3550462518225135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2379056845","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9619833,0.00025784152,0.002586428,0.0005756257,0.000013195625,0.0002103831,0.00019118916,0.00010987481,0.034072153],"genre_scores_gemma":[0.99620014,0.000093269715,0.0009700699,0.00003415335,0.000002109786,0.000030073095,0.00010290899,0.000010009086,0.0025572798],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9855972,0.0019238096,0.00083075016,0.00069109554,0.007827058,0.0031299514],"domain_scores_gemma":[0.9658571,0.0060519446,0.0047405753,0.0019349053,0.01905846,0.0023569847],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009010566,0.00024505434,0.00037567504,0.0069121015,0.0029280249,0.0027466451,0.0013760187,0.00050151214,0.001576128],"category_scores_gemma":[0.030534565,0.0003691127,0.00042211195,0.004698981,0.0019275564,0.0008026276,0.0018262072,0.00061099604,0.00012457564],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004016124,0.00019275842,0.6961403,0.00019014624,0.00017412244,0.00063765614,0.0124717895,0.011692682,0.004365579,0.067132756,0.005473849,0.20112677],"study_design_scores_gemma":[0.000026759511,0.00011923091,0.9680196,0.00007736994,0.00005402627,0.00012665874,0.008263371,0.005597484,0.002752498,0.0018939521,0.012999197,0.00006983442],"about_ca_topic_score_codex":0.695602,"about_ca_topic_score_gemma":0.7301443,"teacher_disagreement_score":0.304398,"about_ca_system_score_codex":0.02382,"about_ca_system_score_gemma":0.049035978,"threshold_uncertainty_score":0.61238134},"labels":[],"label_agreement":null},{"id":"W2386801703","doi":"","title":"Implementing the Six Publicity Policies to Promote the Organization of Bidding","year":2004,"lang":"en","type":"article","venue":"Research and Exploration in Laboratory","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"L'Alliance Boviteq","funders":"","keywords":"Publicity; Bidding; Business; Public relations; Public administration; Marketing; Political science","score_opus":0.1865631183920486,"score_gpt":0.44425380886712273,"score_spread":0.25769069047507415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2386801703","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15761219,0.0011331908,0.20913556,0.0829532,0.0029037502,0.0052350084,0.0008300822,0.0031350274,0.537062],"genre_scores_gemma":[0.6164565,0.0007207631,0.26384118,0.014070528,0.00062444044,0.0038084215,0.00034149815,0.00035630647,0.09978031],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9666459,0.011551215,0.0023662504,0.0017913851,0.012138193,0.005507183],"domain_scores_gemma":[0.91996783,0.020959653,0.01384739,0.011378225,0.020982442,0.0128644155],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.040204164,0.0007133282,0.0005056968,0.0029818676,0.0049806456,0.014641996,0.0025641054,0.00725597,0.0059929937],"category_scores_gemma":[0.07289268,0.00094717863,0.0014403858,0.0024235707,0.006434184,0.004500738,0.0058154943,0.008658373,0.0016854103],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021076275,0.0009159343,0.015669737,0.00049137976,0.000065813256,0.00022608587,0.0035310206,0.0053634057,0.0023939065,0.8400459,0.040696703,0.09038927],"study_design_scores_gemma":[0.00046981176,0.0009811282,0.050519545,0.000944247,0.00021017872,0.0007874486,0.0053873784,0.013729,0.016210925,0.23389983,0.67621326,0.0006472683],"about_ca_topic_score_codex":0.0097416965,"about_ca_topic_score_gemma":0.015592947,"teacher_disagreement_score":0.040204164,"about_ca_system_score_codex":0.009948294,"about_ca_system_score_gemma":0.031922113,"threshold_uncertainty_score":0.21262252},"labels":[],"label_agreement":null},{"id":"W2394560132","doi":"10.1061/9780784479827.046","title":"Utilization of Value and Risk Assessments in Transportation Procurement: A Case Study of a New Highway Corridor","year":2016,"lang":"en","type":"article","venue":"Construction Research Congress 2016","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Procurement; Government (linguistics); Transport engineering; Value engineering; Business; Cost–benefit analysis; Value (mathematics); Finance; Operations management; Engineering; Computer science; Marketing","score_opus":0.26826629733429497,"score_gpt":0.4892450831468707,"score_spread":0.22097878581257574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2394560132","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9658052,0.0002560211,0.010620341,0.00089157344,0.000010697191,0.0003301453,0.00006983872,0.000028127306,0.021988131],"genre_scores_gemma":[0.98757404,0.00030350478,0.009758078,0.000040148323,0.000007787368,0.00008597686,0.00004019652,0.000014315612,0.0021760063],"study_design_codex":"simulation_or_modeling","study_design_gemma":"qualitative","domain_scores_codex":[0.9898245,0.007626212,0.00022038214,0.00020278057,0.001216006,0.0009101734],"domain_scores_gemma":[0.9827047,0.013044228,0.0010690779,0.0006529853,0.001841618,0.0006873448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010678786,0.00074294454,0.00041849754,0.0019773412,0.004317383,0.0040889997,0.0019729196,0.0021247247,0.0025232886],"category_scores_gemma":[0.012409389,0.0006213712,0.00092168385,0.0022992557,0.0019899863,0.0026656827,0.002156692,0.0020766598,0.00025569054],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018726952,0.010871564,0.16463567,0.0010158385,0.0003898629,0.032250777,0.04150715,0.39613706,0.007178305,0.104951344,0.008066495,0.23112318],"study_design_scores_gemma":[0.00050462317,0.006935337,0.07717427,0.00075099553,0.00043807816,0.0065880166,0.20635986,0.6288573,0.011195047,0.020810943,0.039936017,0.0004495348],"about_ca_topic_score_codex":0.04674192,"about_ca_topic_score_gemma":0.115072735,"teacher_disagreement_score":0.04674192,"about_ca_system_score_codex":0.010202522,"about_ca_system_score_gemma":0.0062200865,"threshold_uncertainty_score":0.092939734},"labels":[],"label_agreement":null},{"id":"W2398201199","doi":"10.1061/9780784479827.240","title":"Fuzzy System Dynamics for Modeling Construction Risk Management","year":2016,"lang":"en","type":"article","venue":"Construction Research Congress 2016","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Fuzzy logic; Computer science; Defuzzification; Risk analysis (engineering); Fuzzy set; Risk management; System dynamics; Data mining; Fuzzy number; Artificial intelligence","score_opus":0.1280947262875162,"score_gpt":0.4114224563252587,"score_spread":0.2833277300377425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2398201199","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00912346,0.00046337966,0.98185754,0.00033488421,0.00005123684,0.000049692193,0.0001211468,0.00011002553,0.007888625],"genre_scores_gemma":[0.7965556,0.0018136194,0.19127685,0.000113087306,0.00011704509,0.0003647387,0.00027091292,0.000048147067,0.009440085],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996309,0.00013895516,0.000022117676,0.000057540932,0.00011879924,0.00003161471],"domain_scores_gemma":[0.9994,0.00036954932,0.000077431025,0.000023289931,0.00010664845,0.000023059594],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010988755,0.0007579312,0.00058116723,0.00090872083,0.0005985609,0.001395566,0.0010258567,0.0011538728,0.0033801303],"category_scores_gemma":[0.0022341157,0.00028866864,0.0008714948,0.00077159976,0.00062574615,0.0013951083,0.00079234166,0.0013533412,0.00033358744],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012374307,0.00001628537,0.00058320235,0.00004149974,0.00002833042,0.000052731397,0.00009498634,0.9114699,0.0007173546,0.07471242,0.00051066856,0.011760307],"study_design_scores_gemma":[0.000002546843,0.000007804727,0.00008119506,0.000008982783,0.000004648612,0.0000083920595,0.00002115544,0.9841748,0.00011706036,0.014421442,0.0011465293,0.0000054248358],"about_ca_topic_score_codex":0.013858135,"about_ca_topic_score_gemma":0.0079057915,"teacher_disagreement_score":0.013858135,"about_ca_system_score_codex":0.0015328104,"about_ca_system_score_gemma":0.0015258742,"threshold_uncertainty_score":0.02755493},"labels":[],"label_agreement":null},{"id":"W2400666807","doi":"10.1061/9780784479827.009","title":"Framework for Assessing the Impact of Construction Research and Development on the Construction Industry and Academia","year":2016,"lang":"en","type":"article","venue":"Construction Research Congress 2016","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Construction industry; Incentive; Plan (archaeology); Computer science; Construction management; Process management; Engineering management; Engineering; Construction engineering; Economics; Civil engineering","score_opus":0.41110296399636914,"score_gpt":0.555760464238893,"score_spread":0.14465750024252388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2400666807","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":"evaluation","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":"evaluation","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008799587,0.0012653226,0.85797435,0.010585609,0.00016619849,0.0035121331,0.0013401802,0.00045291663,0.115903825],"genre_scores_gemma":[0.1775124,0.001210783,0.80987567,0.0009904513,0.0000856528,0.0050622243,0.0007970705,0.0000596223,0.004406042],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9570136,0.02571283,0.0027900392,0.0021521645,0.01050766,0.001823629],"domain_scores_gemma":[0.9773094,0.01172113,0.0021807153,0.001320557,0.006505529,0.0009627701],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.039408967,0.0033828204,0.0013895367,0.015099722,0.0034005917,0.011731247,0.004046409,0.003797357,0.0071230573],"category_scores_gemma":[0.024273183,0.0010048082,0.0034394113,0.0057561654,0.009676931,0.008191609,0.0055775996,0.0034548892,0.0012631225],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004147889,0.00016208294,0.0019099268,0.00040539578,0.00007485714,0.00017783734,0.0004674214,0.029191129,0.0005198088,0.9406443,0.002871437,0.023534324],"study_design_scores_gemma":[0.0001370152,0.00038172232,0.00292219,0.0016359828,0.00019580663,0.00031238643,0.002135949,0.0922688,0.00199591,0.8468679,0.05095729,0.00018911903],"about_ca_topic_score_codex":0.02470911,"about_ca_topic_score_gemma":0.021467086,"teacher_disagreement_score":0.960591,"about_ca_system_score_codex":0.022321278,"about_ca_system_score_gemma":0.02851283,"threshold_uncertainty_score":0.20841706},"labels":[],"label_agreement":null},{"id":"W2403082195","doi":"","title":"Risk Management, Tricks of the Trade for Project Managers","year":2003,"lang":"en","type":"book","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Excuse; Risk management; Project manager; Psychology; World Wide Web; Project management; Computer science; Management; Political science; Law; Economics","score_opus":0.08032804324805991,"score_gpt":0.3514144567963643,"score_spread":0.2710864135483044,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2403082195","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029857904,0.16138968,0.034378193,0.13699456,0.0102261575,0.00017243905,0.00035450223,0.0014210745,0.6520777],"genre_scores_gemma":[0.023415603,0.057913896,0.011656698,0.009574772,0.0047065145,0.00013589222,0.0002225439,0.00042787983,0.89194626],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99918634,0.00018628256,0.000044394554,0.000077408855,0.00046888983,0.000036578396],"domain_scores_gemma":[0.998553,0.00073601113,0.00009193942,0.000115894036,0.0003729126,0.00013031335],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010227467,0.0008879517,0.0004670566,0.0006893004,0.0016286946,0.007386595,0.0006214459,0.0012709886,0.028141176],"category_scores_gemma":[0.004648436,0.0003752985,0.00025998708,0.00083289854,0.001931824,0.005346818,0.0013510868,0.0037549126,0.014414952],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008517155,0.000025766936,0.0000832132,0.00016306281,0.0000048534935,0.000058396454,0.00054256775,0.00040323593,0.00012879515,0.0642029,0.7769028,0.157476],"study_design_scores_gemma":[0.0000031138557,0.000016774004,0.00019276098,0.00032026172,0.000002582233,0.0001329155,0.0004843112,0.00028035033,0.00006850307,0.04245529,0.9560335,0.000009665451],"about_ca_topic_score_codex":0.0016012578,"about_ca_topic_score_gemma":0.0027655594,"teacher_disagreement_score":0.028141176,"about_ca_system_score_codex":0.0014970945,"about_ca_system_score_gemma":0.0020253854,"threshold_uncertainty_score":0.0941416},"labels":[],"label_agreement":null},{"id":"W2403321770","doi":"10.1002/cjas.1384","title":"Environment, competitive strategy, and organizational characteristics: A path analytic model of construction organizations’ performance in South Africa","year":2016,"lang":"en","type":"article","venue":"Canadian Journal of Administrative Sciences / Revue Canadienne des Sciences de l Administration","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Mainstream; Business; Organizational performance; Competitive advantage; Order (exchange); Sample (material); Construction industry; Structural equation modeling; Empirical research; Partial least squares regression; Knowledge management; Industrial organization; Marketing; Process management; Computer science; Engineering; Political science","score_opus":0.10743686758595503,"score_gpt":0.3023536397646162,"score_spread":0.19491677217866119,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2403321770","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9949248,0.00005944508,0.0030894058,0.0002706436,0.000002359767,0.00005141046,0.00005688568,0.0000069583925,0.0015380176],"genre_scores_gemma":[0.99873775,0.00007433434,0.00097089465,0.0000070073174,9.900763e-7,0.000038138856,0.000023958683,0.0000017345684,0.00014522165],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9988695,0.0007959694,0.000025263078,0.0000769083,0.00008176375,0.00015056721],"domain_scores_gemma":[0.9953891,0.0032949222,0.0006730724,0.00009067242,0.00029011883,0.00026215555],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002119375,0.0006915942,0.000341042,0.0020534974,0.0008647211,0.0027922462,0.0005747229,0.0006583027,0.0033240896],"category_scores_gemma":[0.006223905,0.00041188617,0.00064215896,0.0017535666,0.0013098875,0.0014334735,0.0017530217,0.0008243097,0.000254153],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040344274,0.0007978718,0.80585515,0.0002907727,0.000522868,0.0014491115,0.01850097,0.10841297,0.0019779804,0.02949148,0.0007694331,0.031528108],"study_design_scores_gemma":[0.00011373,0.0007983623,0.41001067,0.00040946607,0.0003723809,0.0004372137,0.03085161,0.5326481,0.0007107194,0.020356046,0.0031928874,0.00009877181],"about_ca_topic_score_codex":0.015979346,"about_ca_topic_score_gemma":0.009911746,"teacher_disagreement_score":0.015979346,"about_ca_system_score_codex":0.0020210114,"about_ca_system_score_gemma":0.0028356519,"threshold_uncertainty_score":0.031772673},"labels":[],"label_agreement":null},{"id":"W2405833297","doi":"10.21315/jcdc2016.21.1.4","title":"Studying the Reasons for Delay and Cost Overrun in Construction Projects: The Case of Iran","year":2016,"lang":"en","type":"article","venue":"Journal of Construction in Developing Countries","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":93,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Cost overrun; Bidding; Schedule; Cash flow; Business; Duration (music); Actuarial science; Operations management; Construction industry; Economics; Finance; Marketing; Engineering; Construction engineering","score_opus":0.09891297228128945,"score_gpt":0.3655730460287283,"score_spread":0.26666007374743883,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2405833297","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99790776,0.00014884966,0.00050840405,0.00039279996,0.0000056796057,0.000013683379,0.00002847271,0.0000038585367,0.0009904229],"genre_scores_gemma":[0.9991841,0.00016262745,0.00036363147,0.00001879539,0.00000580124,0.0000059144295,0.000023225772,0.0000025445142,0.00023338688],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99716944,0.0006895139,0.0001925782,0.0002501238,0.00090055855,0.0007978484],"domain_scores_gemma":[0.98724073,0.004173213,0.0060607456,0.0002848563,0.0015358456,0.00070463755],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032984882,0.00031885869,0.00022948111,0.0022771757,0.0015595566,0.0014326975,0.00091772084,0.0009178686,0.0011905442],"category_scores_gemma":[0.011572137,0.00037159794,0.000550011,0.0027497944,0.0010245948,0.0014265548,0.00097621686,0.0012367547,0.00011217162],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001703602,0.0002769455,0.9002302,0.00021705053,0.000070822454,0.009524456,0.027029578,0.011055366,0.001550941,0.0063290065,0.0015385472,0.04200667],"study_design_scores_gemma":[0.000026259475,0.00025505657,0.8238548,0.00013186998,0.00009776372,0.0043333825,0.13482383,0.019924203,0.0013808534,0.0029953008,0.01204868,0.0001280491],"about_ca_topic_score_codex":0.041777268,"about_ca_topic_score_gemma":0.055172883,"teacher_disagreement_score":0.041777268,"about_ca_system_score_codex":0.0051954864,"about_ca_system_score_gemma":0.0044993516,"threshold_uncertainty_score":0.08306819},"labels":[],"label_agreement":null},{"id":"W2406074900","doi":"10.1061/9780784479827.062","title":"A Stochastic Simulation Approach for the Integration of Risk and Uncertainty into Megaproject Cost and Schedule Estimates","year":2016,"lang":"en","type":"article","venue":"Construction Research Congress 2016","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Megaproject; Schedule; Computer science; Risk analysis (engineering); Mathematical optimization; Systems engineering; Engineering; Mathematics; Business","score_opus":0.1709584226046758,"score_gpt":0.45014954764322085,"score_spread":0.27919112503854504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2406074900","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0050403043,0.00004742628,0.9928959,0.000071063005,0.000011263709,0.000041748346,0.00005695351,0.000109924185,0.0017255315],"genre_scores_gemma":[0.49626726,0.0004875059,0.49851578,0.00007984048,0.00005414387,0.0005991726,0.0003637364,0.00017311852,0.0034594294],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99809784,0.000957154,0.00009626938,0.00019899788,0.00053921255,0.00011053983],"domain_scores_gemma":[0.99604696,0.0028002146,0.00041368307,0.0001679833,0.00047656472,0.00009449944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028499907,0.00085928047,0.0010164275,0.001468556,0.0006476155,0.0015043132,0.0017195598,0.0009772317,0.0023935144],"category_scores_gemma":[0.0067058257,0.0009530177,0.0013374086,0.0013602924,0.0007272651,0.0012391378,0.0011035652,0.0013228069,0.0002645749],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000053666995,0.000005203786,0.0001660246,0.0000072753537,0.000014140367,0.000012647305,0.000014183667,0.98911756,0.00010179239,0.008389056,0.000056601995,0.0021101872],"study_design_scores_gemma":[0.0000024101405,0.0000072350954,0.000055939705,0.000004661965,0.0000051459397,0.0000069323896,0.0000053042186,0.99562645,0.00007526735,0.0038208482,0.00038458133,0.0000051889024],"about_ca_topic_score_codex":0.02011993,"about_ca_topic_score_gemma":0.0188271,"teacher_disagreement_score":0.02011993,"about_ca_system_score_codex":0.0024389138,"about_ca_system_score_gemma":0.0033052347,"threshold_uncertainty_score":0.040005624},"labels":[],"label_agreement":null},{"id":"W2437854040","doi":"10.1680/mpal.14.00023","title":"Adoption of knowledge management by Canadian housing charities","year":2015,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Management Procurement and Law","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Knowledge management; Business; Work (physics); Profit (economics); Information technology; Engineering; Computer science; Economics","score_opus":0.043928155625057884,"score_gpt":0.2685572723084066,"score_spread":0.2246291166833487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2437854040","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98203284,0.00021519986,0.00044624484,0.0020386511,0.0000097044485,0.00009568872,0.00004258997,0.000016437303,0.015102676],"genre_scores_gemma":[0.9971501,0.00022830824,0.00073905056,0.00012880165,0.0000031975933,0.000021859692,0.0000298475,0.00000421832,0.0016946207],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.98605967,0.0055572353,0.00046646298,0.00080995593,0.0043414664,0.0027652152],"domain_scores_gemma":[0.9666163,0.013917468,0.004497425,0.002196505,0.007899534,0.0048727687],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01359817,0.00030599383,0.000295435,0.002842511,0.009230905,0.0071066734,0.0016153374,0.0010016579,0.0020310644],"category_scores_gemma":[0.03084208,0.00033961845,0.00035462633,0.0026030575,0.004256593,0.0020240934,0.0050540627,0.0013817442,0.00014973099],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038083855,0.00069610076,0.27156413,0.0006035426,0.00007054456,0.0016098093,0.42800426,0.0010058866,0.003570522,0.008782046,0.004029504,0.27968273],"study_design_scores_gemma":[0.000047229496,0.0005217939,0.3396904,0.0007206647,0.00007464547,0.0005037707,0.59038293,0.0026343956,0.001774117,0.0017498113,0.061702363,0.00019792904],"about_ca_topic_score_codex":0.7616985,"about_ca_topic_score_gemma":0.8507321,"teacher_disagreement_score":0.23830152,"about_ca_system_score_codex":0.040196568,"about_ca_system_score_gemma":0.06259254,"threshold_uncertainty_score":0.4794098},"labels":[],"label_agreement":null},{"id":"W2443310345","doi":"10.1061/(asce)co.1943-7862.0001191","title":"Fuzzy Arithmetic Risk Analysis Approach to Determine Construction Project Contingency","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":60,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Fuzzy logic; Defuzzification; Fuzzy number; Computer science; Contingency table; Contingency; Fuzzy set; Probabilistic logic; Data mining; Machine learning; Artificial intelligence","score_opus":0.030389552289083615,"score_gpt":0.28156189995364383,"score_spread":0.2511723476645602,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2443310345","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0046623866,0.00011005844,0.99191624,0.000050999795,0.00001797297,0.00004286896,0.000030239962,0.000089988185,0.0030792032],"genre_scores_gemma":[0.33097544,0.00040439275,0.66493684,0.000057339334,0.000055604185,0.00022550355,0.00013493745,0.00005613861,0.0031538187],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99772376,0.0006907659,0.00012613056,0.0002632033,0.0010921642,0.000104040904],"domain_scores_gemma":[0.99846613,0.00081876427,0.00019161707,0.00010061549,0.00038667241,0.000036201065],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024725278,0.0011437769,0.0006751775,0.0030017435,0.00071666593,0.0018398244,0.0011805778,0.0006799741,0.0037812178],"category_scores_gemma":[0.004721924,0.00039501596,0.0013084711,0.001408963,0.0009531838,0.0018184683,0.0010599135,0.0017471621,0.00042004694],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008544251,0.000059771824,0.0015637489,0.00021845158,0.00013009828,0.00015889827,0.00038434338,0.6857255,0.005314865,0.15956995,0.0018070431,0.14498182],"study_design_scores_gemma":[0.00001136776,0.0000790817,0.0006965477,0.0000441569,0.000030134855,0.000110214845,0.00009355409,0.93995273,0.0024765548,0.052084144,0.004372432,0.000049221697],"about_ca_topic_score_codex":0.0031116977,"about_ca_topic_score_gemma":0.003078756,"teacher_disagreement_score":0.0037812178,"about_ca_system_score_codex":0.0013808932,"about_ca_system_score_gemma":0.0019354518,"threshold_uncertainty_score":0.013076186},"labels":[],"label_agreement":null},{"id":"W2477217941","doi":"10.5539/mas.v10n12p34","title":"A Study on Effects of Risk Management in Urban Tunnel Constructing Projects","year":2016,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Risk management; Order (exchange); Project risk management; Project management; Risk management plan; Risk analysis (engineering); Control (management); Business; Program management; Computer science; Engineering; IT risk management; Systems engineering; Finance","score_opus":0.055361223515504404,"score_gpt":0.3301150623320239,"score_spread":0.2747538388165195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2477217941","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9976755,0.000055957626,0.00032725994,0.000100582714,0.000003406624,0.00004057686,0.000011271332,0.000004755028,0.0017807643],"genre_scores_gemma":[0.9990207,0.00009224893,0.00039341958,0.000014749837,0.0000035450485,0.000029488214,0.000010901082,0.000001582397,0.0004333759],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99146444,0.006140694,0.00037207914,0.0003553417,0.0010613729,0.0006061535],"domain_scores_gemma":[0.9604406,0.024858257,0.007364114,0.0011810695,0.003535248,0.0026207645],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005837979,0.0004590223,0.00029943502,0.0011037035,0.0014141796,0.0013956438,0.0005135642,0.0006359942,0.002640407],"category_scores_gemma":[0.024429271,0.00025575954,0.00064379454,0.0007213503,0.00094672927,0.0012523268,0.0012850172,0.0010105838,0.00018774066],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002293437,0.008365608,0.76872826,0.00085537526,0.00036308318,0.0033718771,0.081981264,0.00733237,0.008122625,0.0037285849,0.0015240303,0.113333486],"study_design_scores_gemma":[0.00010509727,0.010235939,0.8642133,0.000306965,0.00021662631,0.0006017071,0.10739886,0.0057917205,0.0036388724,0.0014549423,0.005915594,0.00012038344],"about_ca_topic_score_codex":0.0024024565,"about_ca_topic_score_gemma":0.0027141294,"teacher_disagreement_score":0.005837979,"about_ca_system_score_codex":0.0013334836,"about_ca_system_score_gemma":0.0013262477,"threshold_uncertainty_score":0.03087455},"labels":[],"label_agreement":null},{"id":"W2480709538","doi":"","title":"Project Execution: A Practical Approach to Industrial and Commercial Project Management","year":2010,"lang":"en","type":"book","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Suncor Energy (Canada)","funders":"","keywords":"Project management; Engineering management; Computer science; Process management; Engineering; Systems engineering","score_opus":0.2978487773741145,"score_gpt":0.42736360605618257,"score_spread":0.12951482868206804,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2480709538","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0027672192,0.008080193,0.51511085,0.0044251992,0.0006614207,0.00017071396,0.00015554833,0.00069784635,0.467931],"genre_scores_gemma":[0.068528816,0.015136016,0.4163158,0.0010039366,0.00049058185,0.00048787112,0.00046170363,0.0006101594,0.4969651],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99917233,0.0002589639,0.000040153875,0.00006549563,0.0004046242,0.000058513877],"domain_scores_gemma":[0.9995359,0.00024478108,0.000026067433,0.000039282542,0.00010076278,0.000053086562],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012566424,0.0010086212,0.0004753058,0.0010499576,0.00085801515,0.004436058,0.0011946253,0.0009941988,0.010376972],"category_scores_gemma":[0.0013048105,0.0003786179,0.00033908288,0.0019768546,0.0021237775,0.0031517702,0.0012606801,0.0018821392,0.0035813744],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015340438,0.000045742476,0.00019904714,0.00017557824,0.000006487595,0.00007643727,0.00066939485,0.0067866985,0.0007143783,0.6799614,0.062307976,0.2490416],"study_design_scores_gemma":[0.00000730142,0.00003244124,0.00043980507,0.0002787643,0.000008784109,0.00016643443,0.0006486946,0.011354164,0.0006410811,0.40663394,0.57977015,0.000018495517],"about_ca_topic_score_codex":0.004384703,"about_ca_topic_score_gemma":0.008234602,"teacher_disagreement_score":0.010376972,"about_ca_system_score_codex":0.0021405076,"about_ca_system_score_gemma":0.004083599,"threshold_uncertainty_score":0.0347144},"labels":[],"label_agreement":null},{"id":"W2493718717","doi":"10.1108/jopp-12-01-2012-b001","title":"Early contractor involvement in dutch infrastructure development: Initial experiences with parallel procedures for planning and procurement","year":2012,"lang":"en","type":"article","venue":"Journal of Public Procurement","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ministry of Transportation of Ontario","funders":"Rijkswaterstaat","keywords":"Procurement; Business; Operations management; Value (mathematics); Process management; Public work; Engineering; Computer science; Marketing; Public administration; Political science","score_opus":0.1314950063286543,"score_gpt":0.37119344399650417,"score_spread":0.23969843766784987,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2493718717","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91560566,0.0009462425,0.023578363,0.0018517853,0.00008126697,0.00079202745,0.000056430603,0.000059483864,0.057028662],"genre_scores_gemma":[0.97060704,0.0009172247,0.013527652,0.00025532045,0.000030794075,0.00033889175,0.00011623691,0.00008134324,0.014125487],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9662511,0.02307932,0.0010674986,0.0013552206,0.0043793283,0.0038675421],"domain_scores_gemma":[0.96895695,0.019953845,0.0014559983,0.0017551306,0.003156615,0.004721481],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.026822966,0.0008629477,0.0004943551,0.0007743646,0.0073047657,0.0052417303,0.003169192,0.0021905059,0.0069926847],"category_scores_gemma":[0.03677333,0.0008840111,0.0004742572,0.00200699,0.005045529,0.004123698,0.0082872985,0.004345486,0.0013451165],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00078164286,0.0058053397,0.016326703,0.00086438574,0.00003691802,0.0052560335,0.69422215,0.005356588,0.004756957,0.025796533,0.0049467115,0.23584998],"study_design_scores_gemma":[0.00036634147,0.004564066,0.030715743,0.0010822722,0.000068790876,0.0047445134,0.57890844,0.010866396,0.010152719,0.009069067,0.34910023,0.00036140336],"about_ca_topic_score_codex":0.01968809,"about_ca_topic_score_gemma":0.036085792,"teacher_disagreement_score":0.026822966,"about_ca_system_score_codex":0.007827701,"about_ca_system_score_gemma":0.011445164,"threshold_uncertainty_score":0.14185512},"labels":[],"label_agreement":null},{"id":"W2500302923","doi":"10.2495/safe-v6-n2-293-300","title":"Using monte carlo simulation to mitigate the risk of project cost overruns","year":2016,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Defence Research and Development Canada","funders":"","keywords":"Monte Carlo method; Risk analysis (engineering); Computer science; Reliability engineering; Engineering; Environmental science; Business; Statistics; Mathematics","score_opus":0.058804169499602967,"score_gpt":0.3612288561964072,"score_spread":0.3024246866968042,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2500302923","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.045745317,0.0002502398,0.9497554,0.00034017488,0.000031923744,0.00012525308,0.000042216172,0.00041456232,0.0032948912],"genre_scores_gemma":[0.6763523,0.0003233507,0.3219583,0.00013459915,0.00003769669,0.00025158547,0.00010195816,0.00008391802,0.00075618183],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9942545,0.004098832,0.00019867164,0.0002780616,0.0009877823,0.00018216258],"domain_scores_gemma":[0.95373577,0.040275294,0.002642938,0.0015244292,0.0015751977,0.00024629026],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0094236,0.0008790419,0.0010775144,0.002243596,0.0006023464,0.0014697991,0.0010229513,0.0012006018,0.0013852002],"category_scores_gemma":[0.03938773,0.00068473234,0.0006664263,0.0012734532,0.0007894235,0.0020044937,0.0010871238,0.0013308477,0.00019610111],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058734116,0.00004124288,0.0031921586,0.000043324224,0.000088794535,0.000054851786,0.000100505764,0.96656114,0.00048903294,0.012996909,0.000279653,0.016093694],"study_design_scores_gemma":[0.000011294285,0.000035755205,0.0003266706,0.000021331542,0.000017220511,0.000034704946,0.000023878827,0.9912587,0.00043297897,0.007261192,0.00056151894,0.000014751373],"about_ca_topic_score_codex":0.007667376,"about_ca_topic_score_gemma":0.007764502,"teacher_disagreement_score":0.0094236,"about_ca_system_score_codex":0.0013234825,"about_ca_system_score_gemma":0.0022011015,"threshold_uncertainty_score":0.04983735},"labels":[],"label_agreement":null},{"id":"W2504689187","doi":"10.1057/9780230307520_7","title":"Competing Values in the Management of Innovative Projects: The Case of the RandstadRail Project","year":2011,"lang":"en","type":"book-chapter","venue":"Palgrave Macmillan UK eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute on Governance","funders":"","keywords":"Improvisation; Project management; Engineering; Variety (cybernetics); German; Engineering management; Politics; Business; Management; Political science; Systems engineering; Computer science; Economics; Law; History; Art","score_opus":0.10511154757423237,"score_gpt":0.328414708289622,"score_spread":0.22330316071538964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2504689187","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18103835,0.011508515,0.008846851,0.019115847,0.00020598565,0.00016380376,0.000031341544,0.00004085697,0.77904844],"genre_scores_gemma":[0.8736852,0.0056994082,0.010631792,0.0013095513,0.00009117791,0.00019257942,0.000030280773,0.000051709947,0.10830843],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9933528,0.004340263,0.00009792652,0.00030489403,0.0009366448,0.00096741394],"domain_scores_gemma":[0.99688715,0.00198886,0.00021234434,0.00011116592,0.00021112834,0.0005892292],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0069100168,0.00065027125,0.0004295816,0.001275187,0.010699248,0.013858572,0.002296323,0.0054360176,0.0050514718],"category_scores_gemma":[0.0045536966,0.00040565207,0.0005374769,0.0020462875,0.013037212,0.0053637614,0.0072186883,0.0036553198,0.00062186527],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007747201,0.00020967834,0.0018142471,0.00017376945,0.000021636055,0.004514384,0.05902667,0.0031204955,0.00031438738,0.83406764,0.024347976,0.072311625],"study_design_scores_gemma":[0.000089389876,0.00023217236,0.0041446355,0.0010559048,0.00004190003,0.0025849692,0.11323892,0.005831385,0.00074481656,0.23080936,0.6411063,0.00012023894],"about_ca_topic_score_codex":0.011348525,"about_ca_topic_score_gemma":0.032409433,"teacher_disagreement_score":0.013858572,"about_ca_system_score_codex":0.012303532,"about_ca_system_score_gemma":0.007568794,"threshold_uncertainty_score":0.0892688},"labels":[],"label_agreement":null},{"id":"W2507296671","doi":"10.5539/mas.v10n12p197","title":"Identify and Prioritize Risks of Construction Projects Based on Fuzzy Logic (Case Study: Construction Project of Iranian Investment and Sustainable Development Company)","year":2016,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Weighting; TOPSIS; Fuzzy logic; Reliability (semiconductor); Investment (military); Sustainable development; Rank (graph theory); Computer science; Risk analysis (engineering); Project risk management; Process (computing); Business; Operations research; Project management; Mathematics; Engineering; Project portfolio management; Artificial intelligence; Systems engineering","score_opus":0.15075209548066518,"score_gpt":0.38244511529408726,"score_spread":0.23169301981342208,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2507296671","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9662447,0.00013632938,0.027292388,0.0003773581,0.000006251643,0.00035952003,0.00009660805,0.000034278022,0.005452616],"genre_scores_gemma":[0.9815808,0.0001117319,0.01739194,0.000012155774,0.0000021451492,0.00008694747,0.000046119312,0.0000017505859,0.00076639635],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9983517,0.0006527252,0.00012550372,0.000095633935,0.00054951507,0.00022492748],"domain_scores_gemma":[0.9976907,0.0012311718,0.00039456677,0.00005244429,0.00051475,0.00011634531],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027548322,0.000514829,0.000279187,0.0037809683,0.0010663363,0.0016559961,0.0004586927,0.00078444125,0.0017102341],"category_scores_gemma":[0.0046048816,0.0002693656,0.00051969633,0.0019529476,0.0005265953,0.0010786343,0.00075436756,0.0003825648,0.00013522015],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010137388,0.0015229421,0.41166702,0.0011719457,0.00022010613,0.005376297,0.01970834,0.17383511,0.017308803,0.022539878,0.0038621523,0.3417736],"study_design_scores_gemma":[0.00016356727,0.0021143232,0.28427663,0.00069860055,0.00034945435,0.003881873,0.06277594,0.6025034,0.016051326,0.016967302,0.009992634,0.00022493697],"about_ca_topic_score_codex":0.0074307816,"about_ca_topic_score_gemma":0.012118954,"teacher_disagreement_score":0.0074307816,"about_ca_system_score_codex":0.0018978447,"about_ca_system_score_gemma":0.0023771792,"threshold_uncertainty_score":0.014775097},"labels":[],"label_agreement":null},{"id":"W2512044276","doi":"10.2139/ssrn.2832046","title":"An Appraisal of Lean Construction Project Delivery: Application of Lean Construction","year":2016,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Trinity College","funders":"","keywords":"Lean construction; Lean project management; Integrated project delivery; Lean manufacturing; Business; Lean laboratory; Engineering; Operations management; Process management; Manufacturing engineering; Construction industry; Construction engineering; Construction management; Computer science; Civil engineering","score_opus":0.028215693134342388,"score_gpt":0.3462709001332639,"score_spread":0.3180552069989215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2512044276","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48702204,0.022927253,0.2618296,0.027481627,0.002324488,0.004933854,0.0013952461,0.0013522364,0.19073369],"genre_scores_gemma":[0.8704926,0.0074418047,0.11053501,0.00068852725,0.00030779952,0.0004215627,0.0004395418,0.00011549937,0.009557654],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.96760625,0.011028126,0.0016155192,0.00044351065,0.018554607,0.000752022],"domain_scores_gemma":[0.9377122,0.026063086,0.0036693327,0.0015309904,0.029912485,0.0011119216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.023435337,0.0012242758,0.00065872446,0.008543523,0.0017879452,0.004744211,0.0013247726,0.00094859465,0.0027663813],"category_scores_gemma":[0.0447924,0.00038460785,0.000610405,0.005599393,0.0015670432,0.002781094,0.0016701206,0.001180183,0.0005533535],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012000749,0.0005613401,0.028872522,0.0057228496,0.00012620274,0.00077857205,0.0056604147,0.017887082,0.008586415,0.062738605,0.01838318,0.8494827],"study_design_scores_gemma":[0.0006810197,0.012758222,0.23426124,0.014004582,0.0009784646,0.0018370232,0.047220632,0.19488747,0.05490999,0.08215399,0.35563436,0.000672961],"about_ca_topic_score_codex":0.0071887593,"about_ca_topic_score_gemma":0.014320018,"teacher_disagreement_score":0.023435337,"about_ca_system_score_codex":0.009834415,"about_ca_system_score_gemma":0.013464165,"threshold_uncertainty_score":0.123939395},"labels":[],"label_agreement":null},{"id":"W2514562221","doi":"","title":"Diversification by the largest US contractors","year":2011,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Diversification (marketing strategy); Business; Revenue; Industrial organization; Portfolio; Empirical research; Finance; Marketing","score_opus":0.0539827871785717,"score_gpt":0.24365405683901306,"score_spread":0.18967126966044134,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2514562221","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9901545,0.00026828947,0.00018614432,0.000115551746,0.0000035730418,0.000025076839,0.0027698285,0.000009124335,0.006467932],"genre_scores_gemma":[0.99338865,0.00020185039,0.00027576156,0.000045583594,0.000007863368,0.000020433015,0.003464133,0.000004122317,0.0025916894],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9992513,0.00011025968,0.00006354038,0.00013190354,0.000295055,0.00014797988],"domain_scores_gemma":[0.9947265,0.0007925066,0.0023233742,0.00032185117,0.0008896907,0.0009460665],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009805715,0.00015121342,0.00015517474,0.0021587568,0.000686629,0.0009794272,0.00021585247,0.00018414679,0.004433851],"category_scores_gemma":[0.0044802637,0.00010667729,0.00017869762,0.0023628226,0.000251459,0.00041972814,0.0008307533,0.00036540188,0.00049708434],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000069009344,0.000027458032,0.97108805,0.000012161152,0.000027754608,0.00006140108,0.00052936363,0.0001987108,0.00043511303,0.00070306205,0.0032596728,0.023588235],"study_design_scores_gemma":[0.000004745277,0.00003060351,0.9901848,0.000015471729,0.000009246173,0.00018081602,0.0008424258,0.0005287947,0.0002654814,0.00016543898,0.007766102,0.0000059043423],"about_ca_topic_score_codex":0.03630803,"about_ca_topic_score_gemma":0.054015372,"teacher_disagreement_score":0.03630803,"about_ca_system_score_codex":0.0010431206,"about_ca_system_score_gemma":0.000824646,"threshold_uncertainty_score":0.072193384},"labels":[],"label_agreement":null},{"id":"W2515615030","doi":"10.1016/j.ijproman.2016.07.010","title":"Project management self-efficacy as a predictor of project performance: Constructing and validating a domain-specific scale","year":2016,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":95,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"","keywords":"Comparability; Project management triangle; Project management; Scale (ratio); OPM3; Domain (mathematical analysis); Program management; Set (abstract data type); Project planning; Software project management; Measure (data warehouse); Project manager; Engineering management; Knowledge management; Process management; Computer science; Engineering; Systems engineering; Software; Mathematics","score_opus":0.051276334607510736,"score_gpt":0.3559900418015657,"score_spread":0.30471370719405494,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2515615030","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99822086,0.00001342814,0.00044883767,0.000025262789,0.0000043919026,0.00010432589,0.000057012825,0.0000067202805,0.0011192278],"genre_scores_gemma":[0.9977101,0.00003074445,0.0015447964,0.000013905693,0.00000428077,0.00026522123,0.00015995245,0.0000036386803,0.00026733684],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9983557,0.00074908196,0.00016978841,0.00011575362,0.0004821072,0.00012748159],"domain_scores_gemma":[0.9831662,0.010001632,0.002818558,0.0009883351,0.0017019636,0.0013231806],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0042226496,0.0003165356,0.00032734266,0.0012058831,0.0006156329,0.00083413714,0.00044858747,0.0006054086,0.0011635072],"category_scores_gemma":[0.013470113,0.00027879383,0.00063457346,0.00064621464,0.0008337954,0.0005961839,0.0009709306,0.0009759886,0.0002722239],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022262664,0.0021056358,0.975444,0.000049585404,0.00013225903,0.00006133284,0.0019787666,0.0011105322,0.0011452065,0.0004478775,0.0004050659,0.016897194],"study_design_scores_gemma":[0.000040199822,0.0008318198,0.99274033,0.000032978754,0.00004520995,0.000055471253,0.001297559,0.0034567919,0.00069780747,0.00028661417,0.0005000876,0.000015165793],"about_ca_topic_score_codex":0.0010154229,"about_ca_topic_score_gemma":0.001975744,"teacher_disagreement_score":0.0042226496,"about_ca_system_score_codex":0.0004242639,"about_ca_system_score_gemma":0.0008765566,"threshold_uncertainty_score":0.022331774},"labels":[],"label_agreement":null},{"id":"W2515651663","doi":"","title":"project-based work management","year":2016,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Overtime; Workforce; Work (physics); Unpaid work; Capital (architecture); Labour economics; Business; Knowledge management; Public relations; Economics; Engineering; Computer science; Political science; Economic growth","score_opus":0.12706756798004532,"score_gpt":0.38074881827751983,"score_spread":0.2536812502974745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2515651663","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41970208,0.001232917,0.13750039,0.004117165,0.0002758368,0.0031792053,0.0003987919,0.00072906556,0.43286458],"genre_scores_gemma":[0.92053115,0.00048590687,0.0192193,0.00021069555,0.000040167226,0.00081074313,0.00027181368,0.000076898716,0.058353316],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9877222,0.0048143924,0.0005802076,0.0012352221,0.0040793614,0.001568504],"domain_scores_gemma":[0.98652345,0.0020519115,0.0018324455,0.0024636376,0.0028356188,0.0042928965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006685257,0.00042249603,0.00022515557,0.0022425787,0.0043910043,0.004060259,0.002558565,0.0007215273,0.016733874],"category_scores_gemma":[0.014259261,0.00033036777,0.00032174407,0.0019751084,0.0027584212,0.0020140172,0.007303766,0.0011169618,0.0025769006],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000088023015,0.00079496275,0.052535024,0.00046500514,0.00006196075,0.00075110677,0.06994849,0.003096772,0.005179203,0.07241369,0.018608617,0.7760571],"study_design_scores_gemma":[0.000053630134,0.0010546948,0.15804338,0.00062424596,0.00003352809,0.0014140098,0.09679155,0.005181075,0.0026352075,0.030334756,0.7036787,0.00015524373],"about_ca_topic_score_codex":0.013208879,"about_ca_topic_score_gemma":0.019294122,"teacher_disagreement_score":0.016733874,"about_ca_system_score_codex":0.00495803,"about_ca_system_score_gemma":0.012041486,"threshold_uncertainty_score":0.055980444},"labels":[],"label_agreement":null},{"id":"W2518064062","doi":"10.1108/ijmpb-05-2016-0041","title":"Rethinking revisited: insights from an early rethinker","year":2016,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"University of Oxford; Princeton University; World Bank Group","keywords":"Context (archaeology); Scholarship; Institution; Power (physics); Sociology; Political science; Management; Social science; Law; History; Economics","score_opus":0.08318539512705063,"score_gpt":0.36277894696582436,"score_spread":0.2795935518387737,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2518064062","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33121014,0.026051272,0.14245474,0.16114508,0.005092819,0.00059462886,0.0001600197,0.0012000648,0.33209118],"genre_scores_gemma":[0.9210247,0.0042601833,0.027856823,0.010392298,0.0006203891,0.0002794944,0.00010189495,0.0013582807,0.034106098],"study_design_codex":"qualitative","study_design_gemma":"not_applicable","domain_scores_codex":[0.9524647,0.03183399,0.0013311713,0.0049995463,0.007121306,0.0022493356],"domain_scores_gemma":[0.89868164,0.06954114,0.004483924,0.014942721,0.009054786,0.0032957424],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.04115491,0.0010804161,0.0008874688,0.004764954,0.018476425,0.024907447,0.005230851,0.007973973,0.00510456],"category_scores_gemma":[0.107894085,0.0012562297,0.0009374834,0.0039604977,0.049253386,0.03730622,0.016618501,0.01470335,0.0013376385],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005399744,0.00006842751,0.0023525043,0.0002515552,0.000019741901,0.0015185933,0.6120195,0.00023409505,0.00096175453,0.32142982,0.0094998935,0.051590197],"study_design_scores_gemma":[0.000017260976,0.000098552846,0.001982986,0.00124455,0.000033168948,0.001642102,0.22709459,0.0014519587,0.0017249377,0.17751792,0.5870617,0.00013033899],"about_ca_topic_score_codex":0.006574348,"about_ca_topic_score_gemma":0.008888225,"teacher_disagreement_score":0.04115491,"about_ca_system_score_codex":0.013777737,"about_ca_system_score_gemma":0.0104117235,"threshold_uncertainty_score":0.21765053},"labels":[],"label_agreement":null},{"id":"W2522875718","doi":"10.5539/ijms.v8n5p69","title":"The Relationship between Coordination Mechanisms and Communication Efficiency in Projects Involving Marketing Managers: Quantitative Findings from Moroccan SMEs","year":2016,"lang":"en","type":"article","venue":"International Journal of Marketing Studies","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Project management; Knowledge management; Marketing; Process management; Marketing communication; Computer science; Management; Economics","score_opus":0.14782938502405535,"score_gpt":0.40554959207673813,"score_spread":0.2577202070526828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2522875718","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9993868,0.00003921642,0.00006477452,0.000047120866,7.557584e-7,0.000007664685,0.000012062545,6.127869e-7,0.0004410861],"genre_scores_gemma":[0.99974257,0.00003333201,0.00007257185,0.000010274528,0.0000012464536,0.00001563268,0.000009118339,7.0892276e-7,0.00011470709],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9968822,0.0017034176,0.00027409405,0.00024019941,0.00043719605,0.00046297355],"domain_scores_gemma":[0.98261917,0.01076535,0.0036115798,0.0004201315,0.0015294928,0.0010543073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005161697,0.00021630756,0.00022302051,0.0012936273,0.0012717327,0.0015075448,0.0003491935,0.00041282803,0.0015760761],"category_scores_gemma":[0.013813574,0.0001821902,0.00012697375,0.0010369201,0.0010071938,0.00090851303,0.0011549295,0.00032333043,0.00015401668],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022544661,0.00029362182,0.6405217,0.00041833325,0.00004410439,0.0014168744,0.32003748,0.00026626853,0.004269543,0.00082023983,0.00039781418,0.031288628],"study_design_scores_gemma":[0.000005276144,0.00018848066,0.7584296,0.00011542696,0.000023490613,0.00019898378,0.238013,0.00032984128,0.0005492845,0.00011462683,0.0020143534,0.00001756358],"about_ca_topic_score_codex":0.007630358,"about_ca_topic_score_gemma":0.010268622,"teacher_disagreement_score":0.007630358,"about_ca_system_score_codex":0.0016512068,"about_ca_system_score_gemma":0.001513865,"threshold_uncertainty_score":0.027298033},"labels":[],"label_agreement":null},{"id":"W2525538644","doi":"10.1139/cjce-2014-0347","title":"Accelerating repetitive construction projects: with uncertainty and contractors’ judgment","year":2016,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Acceleration; Schedule; Set (abstract data type); Task (project management); Computer science; Operations research; Fuzzy logic; Engineering; Fuzzy set; Risk analysis (engineering); Construction engineering; Systems engineering; Business; Artificial intelligence","score_opus":0.03816002068332578,"score_gpt":0.2509929456459809,"score_spread":0.21283292496265513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2525538644","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19366777,0.00045003646,0.7963178,0.0004499744,0.000038963695,0.00023840813,0.00015006243,0.00018523136,0.008501637],"genre_scores_gemma":[0.8461261,0.00030487342,0.15185869,0.00002788918,0.000043444066,0.00011349118,0.0001239696,0.000026266332,0.0013752925],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9938671,0.0024492086,0.00034484777,0.00068993896,0.002359691,0.00028913704],"domain_scores_gemma":[0.9868716,0.00934258,0.0016340603,0.0004564679,0.0013903062,0.00030497723],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006111753,0.0008154868,0.0009105344,0.002508665,0.0011225931,0.0032215868,0.0010772316,0.000985734,0.0014776742],"category_scores_gemma":[0.018824162,0.00059563323,0.0008537999,0.0024273482,0.00094528624,0.0023641437,0.0015978819,0.001245994,0.00015918337],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050277874,0.00022254401,0.020916067,0.000482889,0.00018035804,0.001113796,0.003872197,0.6422555,0.0060601537,0.031227041,0.0015085066,0.29165813],"study_design_scores_gemma":[0.00002107752,0.00013402868,0.0054311682,0.000088232504,0.00007747234,0.00022422965,0.0014248481,0.9684608,0.0022650606,0.019405166,0.0023701664,0.00009781063],"about_ca_topic_score_codex":0.010828143,"about_ca_topic_score_gemma":0.0107466895,"teacher_disagreement_score":0.010828143,"about_ca_system_score_codex":0.0022390317,"about_ca_system_score_gemma":0.0027032038,"threshold_uncertainty_score":0.032322466},"labels":[],"label_agreement":null},{"id":"W2527902737","doi":"10.1108/jaoc-10-2015-0084","title":"Project control: an exploratory study of levers of control in the context of managing projects","year":2016,"lang":"en","type":"article","venue":"Journal of Accounting & Organizational Change","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Context (archaeology); Management control system; Interdependence; Process management; Control (management); Project management; Knowledge management; Computer science; Originality; Management science; Business; Engineering; Systems engineering; Sociology; Qualitative research","score_opus":0.11734224043761983,"score_gpt":0.341924781637859,"score_spread":0.22458254120023918,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2527902737","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99548656,0.00007159082,0.0022959192,0.00018354063,0.000002252897,0.00012407578,0.000019169323,0.000005364633,0.0018115398],"genre_scores_gemma":[0.9982651,0.000054194705,0.0013650202,0.000022626902,0.0000025203321,0.00011013646,0.0000132856585,0.0000023803752,0.00016485828],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9883454,0.009170482,0.00037261503,0.00046075482,0.0010568717,0.00059384754],"domain_scores_gemma":[0.9532987,0.033190977,0.007909037,0.0018740796,0.002156972,0.0015703114],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011579563,0.0002587003,0.00035721523,0.0016344595,0.0020479672,0.0031087452,0.0008982941,0.0006166979,0.0014068815],"category_scores_gemma":[0.040231682,0.00036397242,0.0002169003,0.0015872696,0.0032809195,0.002649136,0.0027866939,0.0012364355,0.00008763227],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041920727,0.0014589085,0.3731039,0.0006469963,0.00008230352,0.0010573979,0.4924834,0.0018076546,0.0033153407,0.018120216,0.0008904693,0.106614135],"study_design_scores_gemma":[0.00007800073,0.0019480985,0.39108124,0.00037609358,0.000040059353,0.00066252647,0.57566226,0.0052395696,0.0017103177,0.010312657,0.012800419,0.000088796594],"about_ca_topic_score_codex":0.0028830376,"about_ca_topic_score_gemma":0.0030812188,"teacher_disagreement_score":0.011579563,"about_ca_system_score_codex":0.001967253,"about_ca_system_score_gemma":0.0029450983,"threshold_uncertainty_score":0.061239302},"labels":[],"label_agreement":null},{"id":"W2528571161","doi":"","title":"A comparative study of responsible care and ISO 14001 as an effective environmental management system in the chemical and allied industry in South Africa.","year":2015,"lang":"en","type":"dissertation","venue":"ResearchSpace (University of KwaZulu-Natal)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Sasol; European Chemical Industry Council","keywords":"Business; Environmental resource management; Environmental management system; Environmental planning; Engineering; Environmental protection; Environmental science; Ecology; Biology","score_opus":0.07015918137894453,"score_gpt":0.3605000254797061,"score_spread":0.29034084410076155,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2528571161","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9789378,0.0010717645,0.00013330244,0.00057536893,0.000018035516,0.00008102631,0.000063592095,0.0000019990046,0.019117115],"genre_scores_gemma":[0.9966677,0.0008775196,0.00013840286,0.00006770461,0.0000038624025,0.000026498517,0.00003159153,0.0000029482414,0.0021837223],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.99712247,0.0011099176,0.00016114599,0.00016755571,0.00074835896,0.00069042924],"domain_scores_gemma":[0.9928294,0.0030612717,0.001403111,0.00009947503,0.0018005576,0.0008063039],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033135517,0.00020660342,0.00028366153,0.0021956698,0.0026190134,0.002788218,0.00051048095,0.00051264575,0.003983],"category_scores_gemma":[0.010657909,0.0002270936,0.00023956668,0.004400232,0.0016827552,0.0023333924,0.0013979485,0.0008437761,0.0002844851],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00087290467,0.0010802592,0.30435562,0.0019271317,0.00008174161,0.003683928,0.5445483,0.00044001374,0.0039472133,0.027919983,0.0047797514,0.10636314],"study_design_scores_gemma":[0.00001499271,0.00044801025,0.4862652,0.0004736505,0.000032392993,0.00031662764,0.4897055,0.00018554721,0.000469205,0.0003975345,0.021668702,0.000022519283],"about_ca_topic_score_codex":0.057979405,"about_ca_topic_score_gemma":0.11756881,"teacher_disagreement_score":0.057979405,"about_ca_system_score_codex":0.009253804,"about_ca_system_score_gemma":0.006431344,"threshold_uncertainty_score":0.11528385},"labels":[],"label_agreement":null},{"id":"W2531271224","doi":"10.1139/cjce-2016-0223","title":"Developing a cost normalization framework for phase-based performance assessment of construction projects","year":2016,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Yeungnam University","keywords":"Normalization (sociology); Benchmarking; Computer science; Cost estimate; Currency; Risk analysis (engineering); Operations research; Process management; Engineering; Systems engineering; Business; Economics","score_opus":0.0758732569755551,"score_gpt":0.34717463753474215,"score_spread":0.27130138055918707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2531271224","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0026095356,0.0001901848,0.99055415,0.00025830127,0.000043187185,0.0002767468,0.00015328718,0.00019797,0.005716664],"genre_scores_gemma":[0.16236764,0.0007393405,0.8321613,0.00011682345,0.000108745844,0.0013130599,0.0006200079,0.000192101,0.002380953],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98340225,0.0059912875,0.0012498406,0.0010781798,0.0074437484,0.00083465624],"domain_scores_gemma":[0.98741174,0.0037315465,0.0017063464,0.00088988064,0.0059990864,0.00026139794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01766144,0.0023061289,0.001744992,0.007959796,0.0013564355,0.00521453,0.0038245765,0.0015060769,0.0029739407],"category_scores_gemma":[0.027294962,0.0007506101,0.0017727688,0.006036094,0.0017947714,0.005965631,0.0035940397,0.0025829228,0.0007316299],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034170425,0.00020248977,0.0024936732,0.0003245582,0.00007094032,0.00012836985,0.000315877,0.5765967,0.0013126344,0.28371242,0.0049025784,0.12990555],"study_design_scores_gemma":[0.0000170241,0.00016039424,0.0025687306,0.0002797349,0.000051413328,0.00015450729,0.00036141917,0.8623558,0.0021616663,0.11255391,0.019199397,0.0001359275],"about_ca_topic_score_codex":0.013651274,"about_ca_topic_score_gemma":0.013586993,"teacher_disagreement_score":0.01766144,"about_ca_system_score_codex":0.007451807,"about_ca_system_score_gemma":0.008114586,"threshold_uncertainty_score":0.0934037},"labels":[],"label_agreement":null},{"id":"W2531757054","doi":"10.17159/2309-8775/2016/v58n3a5","title":"Productivity management in the South African civil construction industry - factors affecting construction productivity","year":2016,"lang":"en","type":"article","venue":"Journal of the South African Institution of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Atomic Energy (Canada); Canadian Society of Intestinal Research","funders":"","keywords":"Likert scale; Productivity; Construction industry; Engineering; Questionnaire; Marketing; Profit (economics); Construction management; Computer-assisted web interviewing; Operations management; Business; Civil engineering; Economic growth; Economics; Construction engineering; Psychology","score_opus":0.03719223915797242,"score_gpt":0.2663171077391516,"score_spread":0.2291248685811792,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2531757054","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99230725,0.0013206468,0.000289289,0.0010963352,0.000013827633,0.000038196762,0.00006410703,0.000004391457,0.004866121],"genre_scores_gemma":[0.9981938,0.00087704434,0.00020082714,0.000031074425,0.0000060801535,0.000010546178,0.000022428352,0.000001441642,0.00065680157],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99883527,0.00032289964,0.00008692458,0.00006443456,0.0002704504,0.0004201152],"domain_scores_gemma":[0.99744177,0.00073527836,0.00095997885,0.000041711726,0.00037639317,0.00044476046],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012546045,0.00029961404,0.00020741664,0.0015444196,0.0020545393,0.0020961422,0.00032704818,0.00045983138,0.00396049],"category_scores_gemma":[0.0039694128,0.00021355276,0.00022153252,0.002662148,0.00096924574,0.0008426624,0.0012236864,0.00048323764,0.00032772895],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018636022,0.00037632408,0.7579455,0.0016565226,0.00006807532,0.004620841,0.07224171,0.0022820784,0.0057620653,0.003571484,0.0027762589,0.14851277],"study_design_scores_gemma":[0.000004902668,0.00018111213,0.8971613,0.00041652872,0.000020464304,0.00096493616,0.08693358,0.0006467542,0.0006078122,0.0005162308,0.012521976,0.000024389636],"about_ca_topic_score_codex":0.016154222,"about_ca_topic_score_gemma":0.020119503,"teacher_disagreement_score":0.016154222,"about_ca_system_score_codex":0.0028768484,"about_ca_system_score_gemma":0.0038236536,"threshold_uncertainty_score":0.032120407},"labels":[],"label_agreement":null},{"id":"W25391109","doi":"10.1097/icb.0b013e31828993a1","title":"Factors Influencing Design Changes in Oil and Gas Projects","year":2014,"lang":"en","type":"article","venue":"International Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Casual; Scope (computer science); Schedule; Engineering; Quality (philosophy); Work (physics); Operations management; Computer science","score_opus":0.04801338670780231,"score_gpt":0.29179280509185124,"score_spread":0.24377941838404893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W25391109","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9969289,0.0002072053,0.00044738894,0.00008781033,0.000007991436,0.00002008798,0.000052220857,0.000005318096,0.0022431978],"genre_scores_gemma":[0.99924326,0.00006849618,0.00018662267,0.000008657832,0.0000031217278,0.000004951159,0.00003058962,0.0000020978327,0.00045231608],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.998014,0.00075595605,0.00017853745,0.00016638107,0.00056310475,0.000322031],"domain_scores_gemma":[0.99072623,0.0032285526,0.003808797,0.00024121722,0.0009503725,0.0010447077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010830779,0.00023337603,0.00019958311,0.00087436015,0.0005309883,0.0010948197,0.00025060002,0.0005239944,0.0042148093],"category_scores_gemma":[0.008539472,0.00017826416,0.00034596393,0.000918096,0.0004988903,0.0003118924,0.00035959983,0.00051315024,0.00041564746],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044211646,0.00035138812,0.96235013,0.00007333772,0.000064851345,0.00047854384,0.0008926766,0.0017119712,0.0041378,0.00021451735,0.0002829483,0.028999863],"study_design_scores_gemma":[0.0000037931106,0.00021845789,0.99579805,0.000016058844,0.000021680256,0.00013950671,0.0017671648,0.0005665367,0.00052271155,0.00011462875,0.0008178518,0.000013406015],"about_ca_topic_score_codex":0.01141602,"about_ca_topic_score_gemma":0.031122543,"teacher_disagreement_score":0.01141602,"about_ca_system_score_codex":0.0011984583,"about_ca_system_score_gemma":0.0016972197,"threshold_uncertainty_score":0.022699118},"labels":[],"label_agreement":null},{"id":"W2539156014","doi":"10.7551/mitpress/6478.003.0020","title":"Appendix B: Attendees at the IMEC Forums in Montreal, Poitiers, and James Bay","year":2001,"lang":"en","type":"book-chapter","venue":"The MIT Press eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bay; History; Geography; Archaeology","score_opus":0.0680897860614899,"score_gpt":0.29931132258531634,"score_spread":0.23122153652382643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2539156014","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0021371883,0.0053387326,0.00042106953,0.0051280777,0.008728234,0.00026804273,0.004326428,0.00039888348,0.97325337],"genre_scores_gemma":[0.0030270913,0.00089745875,0.00015135614,0.00044617162,0.00047584987,0.00005544168,0.0005826777,0.000099165845,0.99426466],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99966407,0.00004440883,0.000005772441,0.00004755203,0.00014386704,0.000094465555],"domain_scores_gemma":[0.99894136,0.0001965542,0.00004152785,0.00003681297,0.00028455042,0.00049910153],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00058540516,0.0010644916,0.00044177056,0.0020972127,0.0048250807,0.0026042266,0.000986074,0.0015013131,0.5008804],"category_scores_gemma":[0.0013113748,0.00031637988,0.00030765007,0.0031509253,0.0005666604,0.0018666756,0.0017651258,0.0012277008,0.12963168],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006295486,0.000016507573,0.00012014847,0.000032777796,4.5557658e-7,0.00004182939,0.00018738053,0.000013877828,0.000052588588,0.0012162407,0.9883646,0.009947232],"study_design_scores_gemma":[0.0000020510474,0.0000033206268,0.00080262637,0.00003446275,4.0719775e-7,0.000018462842,0.0002777225,0.000008968763,0.0000217903,0.00008864802,0.99873954,0.0000019859708],"about_ca_topic_score_codex":0.048328467,"about_ca_topic_score_gemma":0.17932172,"teacher_disagreement_score":0.95167154,"about_ca_system_score_codex":0.0034695347,"about_ca_system_score_gemma":0.0025180671,"threshold_uncertainty_score":0.7119335},"labels":[],"label_agreement":null},{"id":"W2539401963","doi":"10.5539/ibr.v9n11p215","title":"Climate Change as an Emerging Component of Project Risk in the Agriculture Sector: An Empirical Assessment","year":2016,"lang":"en","type":"article","venue":"International Business Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Climate change; Agriculture; Principal component analysis; Empirical research; Business; Risk factor; Environmental resource management; Natural resource economics; Geography; Economics; Statistics; Mathematics","score_opus":0.3697966050100278,"score_gpt":0.5482313875988929,"score_spread":0.17843478258886508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2539401963","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99904984,0.000066710425,0.0003196532,0.000053725238,0.0000010696385,0.000016556107,0.000029866658,0.0000011709037,0.00046142947],"genre_scores_gemma":[0.99961156,0.000066763016,0.000184537,0.000006034272,0.0000040590417,0.000010311019,0.000053719978,7.070394e-7,0.00006248956],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9970282,0.0015137909,0.00023302084,0.00023205749,0.0006725335,0.00032049319],"domain_scores_gemma":[0.964317,0.023747861,0.0072490736,0.0011330914,0.0020321654,0.0015207924],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0053083994,0.00025942276,0.00029854962,0.0023140868,0.00057205046,0.0014603762,0.00050961145,0.00046632616,0.001946278],"category_scores_gemma":[0.014408754,0.00022010904,0.0006540013,0.0025444648,0.0012179055,0.0012857089,0.0015473409,0.0009363787,0.00015706486],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016428063,0.000076919896,0.99652326,0.000010830446,0.000024417213,0.000050774084,0.0005693799,0.00015207514,0.000035567926,0.00016362821,0.000022150902,0.002354721],"study_design_scores_gemma":[0.0000017203164,0.000072926814,0.99358565,0.000023072611,0.000021442062,0.00008310969,0.0032196299,0.0026463529,0.000054567543,0.00012758387,0.00015878433,0.0000051362786],"about_ca_topic_score_codex":0.004855795,"about_ca_topic_score_gemma":0.0061260317,"teacher_disagreement_score":0.0053083994,"about_ca_system_score_codex":0.0007547976,"about_ca_system_score_gemma":0.0013375208,"threshold_uncertainty_score":0.028073847},"labels":[],"label_agreement":null},{"id":"W2551155407","doi":"10.5539/ibr.v10n1p1","title":"Critical Success Factors of International Projects in Vietnam","year":2016,"lang":"en","type":"article","venue":"International Business Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Stakeholder; Critical success factor; Process (computing); Project management; Process management; Public relations; Economics; Political science; Computer science; Management","score_opus":0.24388917587895656,"score_gpt":0.5047008591973612,"score_spread":0.26081168331840465,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2551155407","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9899379,0.0001488711,0.00044927403,0.00020664229,0.000007646622,0.00004952198,0.000109566085,0.000005980659,0.009084487],"genre_scores_gemma":[0.9991935,0.00007934214,0.00012884237,0.000005779951,0.0000026155244,0.000015748874,0.00006572516,0.0000024724586,0.0005060342],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.998495,0.00045483228,0.00010904435,0.00010745375,0.00041240052,0.00042124765],"domain_scores_gemma":[0.98514026,0.003853264,0.0031431182,0.00025150244,0.0024581947,0.005153671],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019643893,0.00031371124,0.00020204486,0.002123051,0.00101728,0.00214704,0.0002909437,0.00027742752,0.004873565],"category_scores_gemma":[0.008626021,0.00018740568,0.00019724331,0.0021144706,0.00091508223,0.0007408755,0.0010966063,0.00080748054,0.0002595133],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001162716,0.00033551463,0.9560495,0.00013804487,0.00006280169,0.00096069736,0.006436072,0.0019698192,0.00056281796,0.006221636,0.001750921,0.025395788],"study_design_scores_gemma":[0.000009947784,0.00018644598,0.9626441,0.0001272094,0.000022048158,0.0002780534,0.024697091,0.0026447375,0.00048257672,0.0015547773,0.007328293,0.00002461673],"about_ca_topic_score_codex":0.021708723,"about_ca_topic_score_gemma":0.018397884,"teacher_disagreement_score":0.021708723,"about_ca_system_score_codex":0.0024907354,"about_ca_system_score_gemma":0.0042705657,"threshold_uncertainty_score":0.04316473},"labels":[],"label_agreement":null},{"id":"W2556549032","doi":"10.1016/j.ijproman.2016.11.002","title":"Theories for classification vs. classification as theory: Implications of classification and typology for the development of project management theories","year":2016,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":54,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Typology; Classification scheme; Confusion; Field (mathematics); Project management; Flourishing; Epistemology; Range (aeronautics); Management science; Computer science; Data science; Sociology; Engineering; Mathematics; Psychology; Social psychology; Systems engineering","score_opus":0.13016977860068768,"score_gpt":0.42527381197665565,"score_spread":0.29510403337596797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2556549032","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10160282,0.0067675146,0.619608,0.07351063,0.0015567377,0.0011037275,0.00063179695,0.00020581788,0.19501299],"genre_scores_gemma":[0.86574674,0.0021083816,0.12246589,0.0035358,0.000855082,0.002013479,0.0004755271,0.000105610976,0.0026935025],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.966907,0.021647496,0.0019006615,0.0025560104,0.0057948804,0.0011937821],"domain_scores_gemma":[0.8645413,0.103195384,0.00988313,0.008421222,0.011021413,0.0029375216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03463002,0.0010303367,0.0019924291,0.010873258,0.004673364,0.012044147,0.0045739943,0.004457298,0.008387002],"category_scores_gemma":[0.07628149,0.0008034613,0.002194171,0.00915885,0.03648017,0.032094795,0.004985273,0.006052744,0.00088162464],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015314316,0.000048255522,0.0012168104,0.00008105825,0.000012686368,0.00001805631,0.0018275923,0.00032557742,0.000031148145,0.98921996,0.00078891136,0.006414734],"study_design_scores_gemma":[0.000018038007,0.00001440314,0.0005367094,0.00014948094,0.0000061705505,0.00002926724,0.0014348787,0.0019718327,0.00003972176,0.9934729,0.0023145252,0.000012007459],"about_ca_topic_score_codex":0.0027690623,"about_ca_topic_score_gemma":0.0018963416,"teacher_disagreement_score":0.03463002,"about_ca_system_score_codex":0.0077814194,"about_ca_system_score_gemma":0.0069078184,"threshold_uncertainty_score":0.1831432},"labels":[],"label_agreement":null},{"id":"W2561663802","doi":"10.1142/s1363919617500396","title":"THE MEDIATING ROLE OF TEAM COLLABORATION BETWEEN PROCEDURAL JUSTICE CLIMATE AND NEW PRODUCT DEVELOPMENT PERFORMANCE","year":2016,"lang":"en","type":"article","venue":"International Journal of Innovation Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"New product development; Business; Product (mathematics); Team effectiveness; Team composition; Process management; Knowledge management; Economic Justice; Procedural justice; Psychology; Marketing; Political science; Computer science","score_opus":0.050997763376462696,"score_gpt":0.35289127473332665,"score_spread":0.30189351135686393,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2561663802","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9935822,0.00009068175,0.0013593477,0.00027095247,0.00000825183,0.000026412856,0.000016499513,0.0000054178686,0.0046402006],"genre_scores_gemma":[0.9993824,0.00003225373,0.00042390422,0.000014123006,0.0000043883833,0.000016373446,0.0000073291417,0.0000014931063,0.00011775599],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98276055,0.012050319,0.0008010931,0.0009636385,0.0017346032,0.0016898067],"domain_scores_gemma":[0.9153892,0.05766191,0.014211856,0.0032208683,0.0036753912,0.005840847],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010708548,0.00027188697,0.00036819,0.0011110456,0.0016498223,0.0027357435,0.00059480924,0.0005797684,0.002565296],"category_scores_gemma":[0.045025814,0.00018281421,0.0004222311,0.0006893425,0.0013702641,0.0013071607,0.0042932294,0.00084416725,0.00017040841],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003617953,0.0011877697,0.8959941,0.00023553675,0.00023624492,0.00046378808,0.032941658,0.0013548312,0.0020944946,0.006016922,0.0003684717,0.058744363],"study_design_scores_gemma":[0.000028059736,0.0005461028,0.96166646,0.00018035302,0.00013884492,0.00020990144,0.026673485,0.0027467723,0.001201366,0.0047400123,0.0018326141,0.000036047837],"about_ca_topic_score_codex":0.0027590573,"about_ca_topic_score_gemma":0.0035466247,"teacher_disagreement_score":0.010708548,"about_ca_system_score_codex":0.0010593851,"about_ca_system_score_gemma":0.0045183874,"threshold_uncertainty_score":0.056632936},"labels":[],"label_agreement":null},{"id":"W2572380424","doi":"10.7492/ijaec.2016.014","title":"Research on Contractor’s Fairness Concerns in Construction Projects","year":2016,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Construction engineering; Engineering management; Engineering","score_opus":0.07168036552422216,"score_gpt":0.3828858738260675,"score_spread":0.31120550830184535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2572380424","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66118115,0.0025835221,0.030972926,0.025491428,0.00027885145,0.00015100832,0.00007206627,0.000020625212,0.27924845],"genre_scores_gemma":[0.9925171,0.00022494678,0.0007773871,0.00057238096,0.0000708441,0.00003068853,0.000010180902,0.000009413299,0.005787045],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.96188295,0.023353912,0.0015637523,0.0020056278,0.007543694,0.003650039],"domain_scores_gemma":[0.7285858,0.21624704,0.01786662,0.009686279,0.021838458,0.005775855],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.059610628,0.0002908333,0.00067328516,0.0017982279,0.0055965926,0.0071286443,0.0025674002,0.004675847,0.010744032],"category_scores_gemma":[0.16771162,0.0005258845,0.0006434798,0.0021597985,0.00742755,0.008431004,0.0025117719,0.0053526233,0.0003851152],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005171036,0.0004344386,0.037453488,0.00017783424,0.00009889285,0.0002510449,0.016520139,0.002865552,0.00072541105,0.90391266,0.00281338,0.03422992],"study_design_scores_gemma":[0.00020736703,0.0004592991,0.086327,0.0005902646,0.00021767661,0.0004704766,0.03984645,0.014043506,0.003100086,0.7909926,0.06360959,0.0001357175],"about_ca_topic_score_codex":0.016536318,"about_ca_topic_score_gemma":0.01332748,"teacher_disagreement_score":0.059610628,"about_ca_system_score_codex":0.008643463,"about_ca_system_score_gemma":0.014390827,"threshold_uncertainty_score":0.31525487},"labels":[],"label_agreement":null},{"id":"W2575339862","doi":"","title":"The Logical Framework Approach","year":2009,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Agency (philosophy); Project management; Project charter; Logical framework; Project planning; Project management triangle; Computer science; Process management; Extreme project management; Work breakdown structure; Engineering management; OPM3; Management science; Engineering; Systems engineering; Sociology","score_opus":0.13403788628257968,"score_gpt":0.397739936294219,"score_spread":0.2637020500116393,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2575339862","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020007521,0.0043336,0.8102457,0.016784295,0.00061540556,0.0005041406,0.00068278366,0.00055596884,0.16427733],"genre_scores_gemma":[0.13762341,0.00676305,0.81549966,0.005288576,0.0010290673,0.001759962,0.0014323174,0.00038093582,0.030223086],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97213835,0.017288819,0.0019664033,0.0024966716,0.0050776587,0.00103214],"domain_scores_gemma":[0.97465837,0.015164276,0.001362049,0.0027171574,0.0049090288,0.0011890044],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02728174,0.0013059232,0.0010450681,0.0063995114,0.0046863663,0.01653316,0.0042958255,0.0036294404,0.016585227],"category_scores_gemma":[0.022405181,0.00079635193,0.0024043485,0.006011184,0.01681979,0.019127592,0.0065969424,0.005283258,0.0041925036],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000055126234,0.000013002474,0.000112293594,0.00008276442,0.000010440191,0.000041847274,0.0005344682,0.0005230895,0.00004864597,0.98025346,0.0043960586,0.01397847],"study_design_scores_gemma":[0.000012945132,0.000016572287,0.00010540675,0.00027153187,0.000016140126,0.00014793106,0.0008048375,0.0028958565,0.00016470168,0.79699934,0.19854268,0.000022105121],"about_ca_topic_score_codex":0.011550133,"about_ca_topic_score_gemma":0.0071705105,"teacher_disagreement_score":0.02728174,"about_ca_system_score_codex":0.011922523,"about_ca_system_score_gemma":0.016285228,"threshold_uncertainty_score":0.14428139},"labels":[],"label_agreement":null},{"id":"W2576551538","doi":"10.1109/picmet.2016.7806602","title":"Capturing knowledge from research projects: From project reports to storytelling","year":2016,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Kwantlen Polytechnic University","funders":"","keywords":"Storytelling; Computer science; Knowledge management; Narrative","score_opus":0.4046821121657569,"score_gpt":0.48189219866386207,"score_spread":0.07721008649810518,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2576551538","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22819386,0.04398765,0.5826433,0.019981919,0.00090722216,0.004110111,0.0040275557,0.0029217494,0.11322676],"genre_scores_gemma":[0.5118103,0.037045307,0.43844417,0.00096239964,0.00039380149,0.0020149592,0.0024462412,0.00040725135,0.006475687],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9827104,0.012093965,0.0015783338,0.0009566242,0.0023080087,0.00035254654],"domain_scores_gemma":[0.9247907,0.056865845,0.00623762,0.0056061144,0.005458193,0.0010416263],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021366775,0.0013537478,0.000625095,0.013535287,0.0021616244,0.014173452,0.002832706,0.0018425225,0.0028629452],"category_scores_gemma":[0.068138756,0.0012038976,0.00058240216,0.010641043,0.0063806768,0.018523768,0.005730203,0.001884816,0.0011504244],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011795506,0.00015711473,0.013198585,0.0033854754,0.00007263979,0.00076162344,0.14036977,0.0018701635,0.0022542325,0.03347933,0.0076880837,0.796645],"study_design_scores_gemma":[0.00010853903,0.00071177323,0.050934926,0.011949245,0.00034443077,0.0040769074,0.29150772,0.011217122,0.010834058,0.14534175,0.47239006,0.00058348593],"about_ca_topic_score_codex":0.005453191,"about_ca_topic_score_gemma":0.0074322866,"teacher_disagreement_score":0.021366775,"about_ca_system_score_codex":0.0031766756,"about_ca_system_score_gemma":0.0041280203,"threshold_uncertainty_score":0.11299968},"labels":[],"label_agreement":null},{"id":"W2577727907","doi":"10.7492/ijaec.2016.016","title":"The Moral Hazards of Construction Agents from an Income Perspective","year":2016,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Perspective (graphical); Moral hazard; Business; Economics; Computer science; Microeconomics; Incentive","score_opus":0.018058326087321223,"score_gpt":0.31001481980166706,"score_spread":0.29195649371434584,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2577727907","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44037837,0.0015304328,0.08504357,0.06654523,0.00040811775,0.00016032215,0.00028209915,0.000048186397,0.40560377],"genre_scores_gemma":[0.98810905,0.00030984994,0.001320777,0.00041690058,0.00018438451,0.000032569522,0.000016281709,0.0000087106755,0.009601598],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9975313,0.0013993483,0.000055666766,0.0001134288,0.00040099458,0.00049931527],"domain_scores_gemma":[0.9905861,0.005805101,0.0012509784,0.00043098742,0.0009504348,0.0009763398],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037330606,0.000544508,0.0005866122,0.0009710195,0.0017510467,0.0041355877,0.0014941698,0.0037971619,0.0140102655],"category_scores_gemma":[0.010511823,0.00031276367,0.00053200335,0.00059324206,0.005408819,0.004487196,0.0025028451,0.004541854,0.00041494556],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007158969,0.00019654665,0.0042936895,0.000049849514,0.00002642274,0.00047451636,0.001329126,0.010291878,0.00015805262,0.973476,0.0027121692,0.006920145],"study_design_scores_gemma":[0.00004088926,0.000088193294,0.0025904807,0.000076103395,0.000024019339,0.00018284743,0.003683928,0.018898979,0.00013502642,0.9677627,0.0064917943,0.00002506311],"about_ca_topic_score_codex":0.002436983,"about_ca_topic_score_gemma":0.0020280133,"teacher_disagreement_score":0.0140102655,"about_ca_system_score_codex":0.0017067044,"about_ca_system_score_gemma":0.0014663489,"threshold_uncertainty_score":0.04686904},"labels":[],"label_agreement":null},{"id":"W2586459438","doi":"10.1177/875697280603700305","title":"The Perceived Value and Potential Contribution of Project Management Practices to Project Success","year":2006,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":216,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec","funders":"Nature","keywords":"Project management; Project management triangle; OPM3; Value (mathematics); Work (physics); Project charter; Extreme project management; Project stakeholder; Project planning; Knowledge management; Program management; Business; Process management; Management science; Computer science; Engineering; Systems engineering","score_opus":0.043368357676888104,"score_gpt":0.374576593572713,"score_spread":0.3312082358958249,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2586459438","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9780772,0.00052995473,0.0056827385,0.0020313102,0.000027235486,0.00003826163,0.000027090526,0.000017047158,0.013569189],"genre_scores_gemma":[0.9987091,0.00014413605,0.00085110584,0.00002833477,0.000008754045,0.000011540846,0.000007845997,0.0000039335087,0.0002350903],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9688223,0.019792004,0.0012961515,0.00050881534,0.00823321,0.0013475126],"domain_scores_gemma":[0.84046197,0.11337994,0.020065263,0.0040373458,0.013177519,0.008878045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.026633402,0.00027722787,0.0002545335,0.0024280895,0.0012546196,0.0043104845,0.0006729096,0.00067225925,0.0016626994],"category_scores_gemma":[0.12694962,0.0002818787,0.00025242704,0.0012278962,0.0030446749,0.0026665155,0.002967437,0.0011723902,0.0002371041],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037277432,0.0005175111,0.5625986,0.00069436105,0.00033040688,0.00088991056,0.10879878,0.0019741852,0.0029088038,0.014972875,0.001722102,0.30421978],"study_design_scores_gemma":[0.00006773974,0.0018098039,0.6587275,0.0012004551,0.00022216918,0.0027277663,0.2744679,0.009610701,0.0018516199,0.022015622,0.02707661,0.0002220893],"about_ca_topic_score_codex":0.0013494837,"about_ca_topic_score_gemma":0.0019593234,"teacher_disagreement_score":0.026633402,"about_ca_system_score_codex":0.0018338916,"about_ca_system_score_gemma":0.0026739684,"threshold_uncertainty_score":0.14085257},"labels":[],"label_agreement":null},{"id":"W2586486509","doi":"","title":"Effektiva kontraktsmodeller för vägunderhåll","year":2016,"lang":"sv","type":"article","venue":"VTI Rapport","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Incentive; Quality (philosophy); Competition (biology); Business; Reimbursement; Actuarial science; Balance (ability); Operations management; Economics; Microeconomics; Economic growth","score_opus":0.10876266505536468,"score_gpt":0.3300426958153626,"score_spread":0.22128003075999791,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2586486509","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9046928,0.0070197107,0.018020611,0.0032241663,0.00038000743,0.0006089499,0.00031806363,0.00034551762,0.06539009],"genre_scores_gemma":[0.97871196,0.0016697127,0.006875028,0.00028643652,0.00008087401,0.00018505818,0.00023325245,0.00007595547,0.011881731],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9905697,0.0046713706,0.0005530623,0.00049537024,0.0023268245,0.0013835593],"domain_scores_gemma":[0.9866897,0.00821006,0.0012630456,0.0009450739,0.0013926694,0.0014994204],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009428462,0.00056379515,0.0006028538,0.0008603685,0.0014698067,0.0024082519,0.0012444224,0.00091009814,0.017766597],"category_scores_gemma":[0.014456382,0.00022029085,0.0008475104,0.0005144981,0.0010612331,0.0010183665,0.0020755788,0.0013505522,0.0021889845],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0032402189,0.003619556,0.049654696,0.0014666021,0.00018760387,0.0004057453,0.0057569123,0.0057619466,0.004016241,0.008157271,0.0083380975,0.9093952],"study_design_scores_gemma":[0.0014473014,0.03764236,0.48243386,0.0043866276,0.0009942448,0.003123149,0.049049623,0.025699234,0.03702119,0.018879835,0.33894718,0.00037539387],"about_ca_topic_score_codex":0.0044330284,"about_ca_topic_score_gemma":0.0065430547,"teacher_disagreement_score":0.017766597,"about_ca_system_score_codex":0.0016044544,"about_ca_system_score_gemma":0.0028218532,"threshold_uncertainty_score":0.05943519},"labels":[],"label_agreement":null},{"id":"W2592108117","doi":"10.1080/01446193.2017.1294257","title":"Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance","year":2017,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":75,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Craft; Schedule; Productivity; Economic shortage; Work (physics); Operations management; Engineering; Earned value management; Construction industry; Business; Project management; Economics; Economic growth; Geography; Project planning; Management; Construction engineering","score_opus":0.047734274966639886,"score_gpt":0.32474120084868785,"score_spread":0.27700692588204795,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2592108117","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99883586,0.00003843502,0.00015176271,0.000040445113,0.0000010087713,0.000006574886,0.00031508523,0.0000029605021,0.00060787355],"genre_scores_gemma":[0.99820244,0.000087481974,0.00022415002,0.000010740777,0.0000034552409,0.000020791715,0.0010544525,0.0000034653187,0.0003930254],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9970379,0.0012042965,0.00015966414,0.00035973682,0.0009046539,0.00033391244],"domain_scores_gemma":[0.9810909,0.0086719375,0.0046115997,0.0009447406,0.003767742,0.00091310235],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003829772,0.00024971206,0.00027500445,0.0018444475,0.00051759306,0.000969255,0.0006009263,0.00026093496,0.0012833959],"category_scores_gemma":[0.013790786,0.00022459832,0.00035926813,0.0043098396,0.00043382417,0.0005441437,0.0009278839,0.00048777153,0.0003054552],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001122696,0.00012208095,0.98775405,0.000018437444,0.000067639885,0.00005695474,0.00054941955,0.0014014923,0.00018816363,0.000097718126,0.0004307743,0.009201072],"study_design_scores_gemma":[0.0000012821058,0.000048619506,0.9971692,0.000004877771,0.000013464209,0.000014570641,0.0009063906,0.0014035333,0.0000760832,0.000026664879,0.0003319807,0.0000033807833],"about_ca_topic_score_codex":0.10816446,"about_ca_topic_score_gemma":0.16746207,"teacher_disagreement_score":0.10816446,"about_ca_system_score_codex":0.0015441357,"about_ca_system_score_gemma":0.0020328958,"threshold_uncertainty_score":0.21506977},"labels":[],"label_agreement":null},{"id":"W2594608191","doi":"10.17722/ijme.v8i2.312","title":"Perspective of Developer, Buyer, Financier and Equity Participants in Real Estate Project Development Process in India: An important constituent of Construction Industry","year":2017,"lang":"en","type":"article","venue":"International Journal of Management Excellence","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Real estate; Perspective (graphical); Business; Real estate development; Process (computing); Equity (law); Industrial organization; Marketing; Process management; Finance; Computer science","score_opus":0.14538789908023086,"score_gpt":0.46390461932340654,"score_spread":0.3185167202431757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2594608191","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83136076,0.0029925387,0.004685814,0.026521854,0.0001617302,0.00009088662,0.000073797826,0.000014778424,0.13409774],"genre_scores_gemma":[0.9854425,0.0015725795,0.00049895584,0.00058490713,0.000037529226,0.000013829306,0.000013612552,0.0000036022575,0.011832562],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9984182,0.0007337302,0.000035544155,0.00009638261,0.00018517456,0.0005308435],"domain_scores_gemma":[0.99901056,0.00030375618,0.00014428576,0.000017321565,0.00011266656,0.00041137933],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012608166,0.00022749994,0.00015480882,0.0010098384,0.004727294,0.0060630017,0.0007103687,0.0012617494,0.005730657],"category_scores_gemma":[0.0009541843,0.00021000642,0.00021123643,0.0008874561,0.0029097633,0.0030025695,0.002865094,0.0016888035,0.00036133506],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011241038,0.00038658615,0.10401734,0.00028898226,0.000021037755,0.014913154,0.29270595,0.0011365135,0.0023986746,0.5322277,0.009117498,0.042674176],"study_design_scores_gemma":[0.000013201833,0.00015032095,0.03963408,0.0004196681,0.00003415652,0.004738635,0.7579229,0.0031572436,0.0011030871,0.018938826,0.17383179,0.000056076206],"about_ca_topic_score_codex":0.02116665,"about_ca_topic_score_gemma":0.026427858,"teacher_disagreement_score":0.02116665,"about_ca_system_score_codex":0.0047478126,"about_ca_system_score_gemma":0.0051787742,"threshold_uncertainty_score":0.0420869},"labels":[],"label_agreement":null},{"id":"W2596660068","doi":"","title":"Plans, Projections and Practitioners: Engaging with Communities to Explore Adaptation Strategies for Transportation Infrastructure","year":2015,"lang":"en","type":"article","venue":"2015 AGU Fall Meeting","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Quest University Canada","funders":"","keywords":"Adaptation (eye); Business; Environmental planning; Public relations; Process management; Knowledge management; Computer science; Geography; Political science; Psychology","score_opus":0.1986369118219618,"score_gpt":0.3731125357103265,"score_spread":0.17447562388836468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2596660068","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8361269,0.00050537364,0.02615735,0.0723484,0.00051682454,0.0010959352,0.000100772486,0.0002494129,0.062899075],"genre_scores_gemma":[0.9784176,0.00030027755,0.014248086,0.0022254132,0.0000580704,0.00060476083,0.000052466894,0.000072485826,0.0040208106],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.95562196,0.038629573,0.00037516755,0.0010565998,0.0013873837,0.0029293553],"domain_scores_gemma":[0.9512124,0.03332543,0.0024097431,0.0019422363,0.0030496423,0.00806064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.037801467,0.0010192532,0.00048106082,0.0014647528,0.026863972,0.014903513,0.0040673977,0.007737471,0.008976712],"category_scores_gemma":[0.056440912,0.0010308842,0.0007086013,0.001178393,0.013468713,0.014018989,0.02071736,0.011054162,0.0010248062],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011551813,0.00068601454,0.0065700505,0.00015778438,0.000030217185,0.0013782814,0.9335339,0.0008727054,0.00093011116,0.011919259,0.009023974,0.034782216],"study_design_scores_gemma":[0.000021438054,0.00015325975,0.0010759621,0.00012073641,0.00001551738,0.00014045207,0.9610318,0.00087590714,0.00028834757,0.010653839,0.025588637,0.000034117224],"about_ca_topic_score_codex":0.007909451,"about_ca_topic_score_gemma":0.021907499,"teacher_disagreement_score":0.037801467,"about_ca_system_score_codex":0.006500736,"about_ca_system_score_gemma":0.019402266,"threshold_uncertainty_score":0.19991559},"labels":[],"label_agreement":null},{"id":"W2597284893","doi":"10.25148/etd.fidc001262","title":"A Comprehensive Decision Support Framework in the Front-End Phase of Major Transportation Projects","year":2016,"lang":"en","type":"dissertation","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Iran University of Science and Technology; Islamic Azad University; Florida International University; Florida Department of Transportation","keywords":"Dynamism; Phase (matter); Process (computing); Front (military); Process management; Decision support system; Operations research; Engineering; Management science; Computer science; Risk analysis (engineering); Business; Data mining","score_opus":0.08005931103573881,"score_gpt":0.41040118901215394,"score_spread":0.3303418779764151,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2597284893","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016132133,0.0002756696,0.97651905,0.000501141,0.000025835967,0.0002533238,0.00019612363,0.00019804752,0.0058987513],"genre_scores_gemma":[0.49496493,0.0005990778,0.5015907,0.0001037953,0.000041854502,0.00076609326,0.0004482328,0.000035718345,0.0014496376],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9957996,0.0021037,0.0002945463,0.00044018723,0.0010852,0.0002767933],"domain_scores_gemma":[0.9975879,0.0013415089,0.000271897,0.00009467209,0.00054216315,0.00016187136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0060846494,0.0013415125,0.00096566527,0.003079533,0.0012037382,0.0043871263,0.0019151496,0.0015810236,0.0025941138],"category_scores_gemma":[0.0059403796,0.0006322568,0.0014401732,0.0023369272,0.00096785004,0.0030439426,0.0023046855,0.00128762,0.00031361164],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041416657,0.00008554822,0.00078578107,0.00020576981,0.000051476858,0.00023487775,0.00032132881,0.8783441,0.0009692858,0.07796791,0.0008449106,0.040147554],"study_design_scores_gemma":[0.000019294495,0.00007318795,0.00025760956,0.00011409104,0.00003027338,0.00005624062,0.00025343194,0.95202094,0.000473664,0.043385543,0.0032845766,0.000031154756],"about_ca_topic_score_codex":0.008206215,"about_ca_topic_score_gemma":0.008214769,"teacher_disagreement_score":0.008206215,"about_ca_system_score_codex":0.0030228242,"about_ca_system_score_gemma":0.0060509336,"threshold_uncertainty_score":0.032179117},"labels":[],"label_agreement":null},{"id":"W2598555484","doi":"10.5267/j.dsl.2017.1.003","title":"Fuzzy decision analysis for project scope change management","year":2017,"lang":"en","type":"article","venue":"Decision Science Letters","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scope (computer science); Fuzzy logic; Process management; Management science; Change management (ITSM); Operations research; Computer science; Business; Operations management; Engineering; Artificial intelligence","score_opus":0.21335626154855006,"score_gpt":0.4502654722074073,"score_spread":0.23690921065885726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2598555484","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016647924,0.0011311852,0.97336394,0.00058486155,0.00008872946,0.00018687968,0.000139026,0.00008447381,0.0077729914],"genre_scores_gemma":[0.62224996,0.0016959035,0.37071094,0.00019100608,0.000198151,0.00061072,0.00031107521,0.00003188916,0.0040004053],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9959246,0.00221494,0.00019088067,0.0002971144,0.0010864043,0.00028597037],"domain_scores_gemma":[0.99566096,0.0032969273,0.00028164432,0.00008580612,0.00054723443,0.00012728818],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0073104943,0.0009503768,0.0014901502,0.0032718892,0.0012141336,0.0026731216,0.0011745308,0.0014220631,0.0050548133],"category_scores_gemma":[0.010170896,0.00043689212,0.0016027648,0.0027765962,0.0011748525,0.0018853794,0.0010914843,0.0017821573,0.00049158407],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015520843,0.00015180907,0.0014714169,0.0003625303,0.00017353467,0.00029276757,0.00040246715,0.7148408,0.0013750489,0.19807206,0.0028165283,0.07988579],"study_design_scores_gemma":[0.000015923022,0.000054244967,0.00027543164,0.000045158595,0.000024211056,0.000028107315,0.000106598476,0.9437531,0.00025542494,0.05400599,0.0014136982,0.000022033488],"about_ca_topic_score_codex":0.010577504,"about_ca_topic_score_gemma":0.0071507203,"teacher_disagreement_score":0.010577504,"about_ca_system_score_codex":0.004012027,"about_ca_system_score_gemma":0.0030552591,"threshold_uncertainty_score":0.038662076},"labels":[],"label_agreement":null},{"id":"W2599374319","doi":"10.1139/cjce-2016-0274","title":"Development of an internal benchmarking and metrics model for industrial construction enterprises for productivity improvement","year":2017,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Waterloo; Regional Municipality of Waterloo","funders":"","keywords":"Benchmarking; Productivity; Process (computing); Craft; Process management; Computer science; Business; Engineering; Operations management; Marketing; Economics","score_opus":0.09878552071600755,"score_gpt":0.30983031491939406,"score_spread":0.2110447942033865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2599374319","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028086405,0.0001267276,0.9465202,0.0017028702,0.00004663049,0.00052451645,0.00041070906,0.0012406149,0.021341344],"genre_scores_gemma":[0.37543246,0.0002881598,0.61834997,0.00015463856,0.000022356055,0.0014554565,0.0010181549,0.00016265035,0.0031161825],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9919851,0.003659527,0.00058457576,0.0006448114,0.0026812893,0.00044472647],"domain_scores_gemma":[0.9913429,0.0031600075,0.0012922286,0.0008193887,0.0030485692,0.0003367617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011052436,0.0010929295,0.0009155405,0.003151559,0.0010373604,0.0045544594,0.0020673375,0.0013943,0.002739567],"category_scores_gemma":[0.018093172,0.0005275817,0.0011422504,0.0035241821,0.0008592735,0.0052451747,0.0019296657,0.0015059564,0.00076103676],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009668331,0.00048897177,0.024866266,0.00041253492,0.00009490583,0.0001864496,0.0014171174,0.45773005,0.0033305648,0.27189,0.0064983936,0.23298799],"study_design_scores_gemma":[0.000035397577,0.0003372786,0.007332976,0.00036822545,0.000053889486,0.00009967397,0.00087342144,0.8907783,0.0038218836,0.06907049,0.027135914,0.000092540446],"about_ca_topic_score_codex":0.010228437,"about_ca_topic_score_gemma":0.009484024,"teacher_disagreement_score":0.011052436,"about_ca_system_score_codex":0.0061080055,"about_ca_system_score_gemma":0.007489484,"threshold_uncertainty_score":0.058451533},"labels":[],"label_agreement":null},{"id":"W2600362472","doi":"10.1108/ijmpb-05-2016-0044","title":"Ambiguity acceptance and translation skills in the project management literature","year":2017,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of the Fraser Valley","funders":"","keywords":"Project manager; Project management; Knowledge management; Project management triangle; Project stakeholder; OPM3; Originality; Functional manager; Project charter; Process management; Computer science; Business; Psychology; Management; Creativity","score_opus":0.08866892678638798,"score_gpt":0.4095226398213255,"score_spread":0.3208537130349375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2600362472","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28777876,0.46707714,0.062254682,0.05754227,0.0024909896,0.0003481938,0.0002256044,0.00016228753,0.122120045],"genre_scores_gemma":[0.9004017,0.0793116,0.012630294,0.003213357,0.0009449017,0.00033834457,0.00011932137,0.00009948475,0.002940981],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.96459365,0.020926753,0.00386787,0.0017282437,0.008085054,0.00079846027],"domain_scores_gemma":[0.7371861,0.22555493,0.017932901,0.00576561,0.011318091,0.0022423288],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03264177,0.00063400395,0.0010768669,0.01467975,0.003325453,0.011950114,0.001452434,0.0016825702,0.0042322385],"category_scores_gemma":[0.11089812,0.00052553526,0.00096046174,0.01443719,0.0124966055,0.013275399,0.0065543223,0.0026845299,0.00052796456],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019584372,0.00022108221,0.0300924,0.016750818,0.0002915106,0.0026241464,0.15429494,0.0021265175,0.0010536094,0.16455284,0.007096955,0.62069935],"study_design_scores_gemma":[0.00007857714,0.0005356779,0.090933554,0.070270345,0.0006877302,0.007935601,0.22557767,0.004524899,0.003023191,0.29380283,0.30227903,0.0003508807],"about_ca_topic_score_codex":0.0022646755,"about_ca_topic_score_gemma":0.0018833535,"teacher_disagreement_score":0.03264177,"about_ca_system_score_codex":0.003692372,"about_ca_system_score_gemma":0.008493202,"threshold_uncertainty_score":0.17262822},"labels":[],"label_agreement":null},{"id":"W2602032658","doi":"10.11575/prism/24906","title":"An Integrated Framework for Worker Planning and Supervision in Construction","year":2016,"lang":"en","type":"dissertation","venue":"PRISM (University of Calgary)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering management; Business; Process management; Operations management; Knowledge management; Engineering; Construction engineering; Computer science","score_opus":0.03424388841930301,"score_gpt":0.3112983549794696,"score_spread":0.27705446656016663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2602032658","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005724918,0.0014187947,0.9379742,0.004339268,0.0001665823,0.0018214836,0.00033991408,0.00066554925,0.047549255],"genre_scores_gemma":[0.07424326,0.0011433399,0.9172472,0.00018224542,0.000049135993,0.0017124038,0.0005272174,0.000056251425,0.004838879],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9840529,0.009128642,0.0013929935,0.0014850395,0.0027566284,0.0011837345],"domain_scores_gemma":[0.9939189,0.0025675558,0.0006463455,0.0004951045,0.0016165135,0.00075556437],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020425754,0.001825035,0.0008910656,0.006149514,0.0032662738,0.008736296,0.005253885,0.0036836416,0.005760555],"category_scores_gemma":[0.009222553,0.0009517043,0.002014325,0.0049665933,0.006296591,0.0055269864,0.0065164827,0.0026675619,0.0013119333],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052703464,0.00024722322,0.0033832558,0.00086224405,0.000061314015,0.0006831187,0.014390897,0.061512474,0.0009785332,0.7549425,0.009833397,0.15305232],"study_design_scores_gemma":[0.00009445957,0.0002807719,0.005318745,0.0036364936,0.00011192101,0.0006270089,0.015918706,0.12361717,0.001106507,0.5228612,0.3261957,0.00023131905],"about_ca_topic_score_codex":0.058970384,"about_ca_topic_score_gemma":0.05837166,"teacher_disagreement_score":0.058970384,"about_ca_system_score_codex":0.013538655,"about_ca_system_score_gemma":0.02894692,"threshold_uncertainty_score":0.11725432},"labels":[],"label_agreement":null},{"id":"W2605101156","doi":"10.1108/ijmpb-07-2016-0061","title":"In the eye of the beholder","year":2017,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Categorization; Classification scheme; Classifier (UML); Computer science; Process (computing); Construct (python library); Context (archaeology); Artificial intelligence; Management science; Data science; Engineering","score_opus":0.11938438132344698,"score_gpt":0.4186001339838102,"score_spread":0.2992157526603632,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2605101156","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.122110255,0.005049685,0.24616276,0.40233734,0.0041875816,0.0004425516,0.00025569834,0.0006687041,0.21878552],"genre_scores_gemma":[0.8785901,0.0014875451,0.06913819,0.024744578,0.00056400517,0.00027164043,0.000101064725,0.00033635163,0.024766501],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.95937705,0.023469308,0.0014568933,0.004036977,0.01035123,0.0013085487],"domain_scores_gemma":[0.93000925,0.040081304,0.004979652,0.007466166,0.013868087,0.003595551],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03060933,0.0007095038,0.0008223879,0.00417727,0.011654674,0.019295964,0.0015126264,0.004450494,0.0066475268],"category_scores_gemma":[0.10682348,0.00081864896,0.00067080493,0.0024368486,0.035023253,0.029844595,0.009655473,0.013018107,0.0028516203],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017360135,0.000077359,0.0069890767,0.0002740353,0.00003851465,0.00040923958,0.18838784,0.00036563625,0.0018732381,0.6548228,0.05711539,0.089473195],"study_design_scores_gemma":[0.000037270318,0.000096384174,0.0030538673,0.0010405987,0.000028183409,0.0005541472,0.12328172,0.0019275272,0.0011954941,0.5963983,0.27226502,0.000121532554],"about_ca_topic_score_codex":0.008419727,"about_ca_topic_score_gemma":0.0078638615,"teacher_disagreement_score":0.03060933,"about_ca_system_score_codex":0.0069342437,"about_ca_system_score_gemma":0.0095232455,"threshold_uncertainty_score":0.16187954},"labels":[],"label_agreement":null},{"id":"W2607309439","doi":"","title":"Développement d’une approche de management des mégaprojets d’investissement favorisant la performance : intégration des facteurs négligés","year":2016,"lang":"fr","type":"article","venue":"Constellation (Université du Québec à Chicoutimi)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Philosophy","score_opus":0.037375188853297894,"score_gpt":0.25630678637547377,"score_spread":0.2189315975221759,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2607309439","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41460508,0.0021589305,0.4784954,0.0065161497,0.00020115513,0.0013374434,0.00021400378,0.00071029935,0.09576153],"genre_scores_gemma":[0.73542565,0.0009705465,0.25124043,0.00027294786,0.000038275313,0.0006597885,0.00015016907,0.00009309913,0.011149002],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98349726,0.006766675,0.00086049293,0.0016523803,0.00660913,0.00061404414],"domain_scores_gemma":[0.97214353,0.014206079,0.00423016,0.002152353,0.006466423,0.00080136996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014074031,0.0009834517,0.0008140989,0.0035658046,0.002216511,0.008808399,0.0019143132,0.001987342,0.0059918836],"category_scores_gemma":[0.028416753,0.0008095842,0.00095967005,0.0023527693,0.0030121312,0.006013623,0.003444575,0.0018636272,0.0008753593],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004808271,0.0010129509,0.061659016,0.0026992257,0.0003375442,0.0008536624,0.058245637,0.02232787,0.016723182,0.18284003,0.005113789,0.6477062],"study_design_scores_gemma":[0.00032804985,0.0038632492,0.17495167,0.00619058,0.0012983374,0.002094786,0.10212826,0.17366809,0.04261159,0.22198267,0.2702123,0.00067046477],"about_ca_topic_score_codex":0.003428307,"about_ca_topic_score_gemma":0.0076169376,"teacher_disagreement_score":0.9965717,"about_ca_system_score_codex":0.0042356076,"about_ca_system_score_gemma":0.0078075104,"threshold_uncertainty_score":0.07443148},"labels":[],"label_agreement":null},{"id":"W2608946616","doi":"10.1108/ijmpb-03-2016-0028","title":"Enriching project organizations with formal change agents","year":2017,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"McMaster University","keywords":"Business; Organizational change; Process management; Knowledge management; Public relations; Political science; Computer science","score_opus":0.15804587941484757,"score_gpt":0.40970970349299773,"score_spread":0.25166382407815013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2608946616","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77942216,0.003679293,0.1180531,0.007711,0.0004846109,0.0022942626,0.000074997035,0.0007435251,0.08753708],"genre_scores_gemma":[0.9530007,0.0009403437,0.04024578,0.00036692686,0.00012326863,0.0006576368,0.00005768038,0.000049552415,0.004558018],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.97380537,0.019927831,0.0009272166,0.001198787,0.0028231365,0.0013176495],"domain_scores_gemma":[0.94673246,0.02366444,0.0091930805,0.006687726,0.0056726523,0.008049692],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020505045,0.00043459923,0.0003913426,0.002274287,0.0035287165,0.0055665136,0.0019087874,0.0010148175,0.0043452797],"category_scores_gemma":[0.0409469,0.0003876237,0.00036718082,0.001504953,0.0035675822,0.0053015677,0.008369369,0.0010807336,0.00093195116],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036275265,0.0020847535,0.058735855,0.0031527244,0.00013600137,0.0012728237,0.07516315,0.00232968,0.005858686,0.032924663,0.008552023,0.8094269],"study_design_scores_gemma":[0.00042074328,0.00562861,0.09863786,0.00424258,0.00041004675,0.0024243814,0.1437548,0.0100773,0.008076021,0.063229784,0.6628293,0.00026872384],"about_ca_topic_score_codex":0.0008584776,"about_ca_topic_score_gemma":0.0022284905,"teacher_disagreement_score":0.020505045,"about_ca_system_score_codex":0.0021779747,"about_ca_system_score_gemma":0.0064037605,"threshold_uncertainty_score":0.10844231},"labels":[],"label_agreement":null},{"id":"W2609671984","doi":"10.19030/jabr.v33i3.9934","title":"How Knowledge Management Implementation Affects The Performance Of Egyptian Construction Companies","year":2017,"lang":"en","type":"article","venue":"Journal of Applied Business Research (JABR)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Business; Sample (material); Perspective (graphical); Process (computing); Knowledge management; Process management; Operations management; Marketing; Computer science; Economics","score_opus":0.161385728963625,"score_gpt":0.4515729754071051,"score_spread":0.29018724644348015,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2609671984","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99797326,0.000060242928,0.000024690966,0.00010444425,8.9162506e-7,0.000003979334,0.000010288271,0.0000015286055,0.0018206568],"genre_scores_gemma":[0.99959725,0.00004930873,0.000025930874,0.000009387797,9.0778815e-7,0.0000014415021,0.000015238378,3.784574e-7,0.00030013162],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9984097,0.00035044912,0.000116981755,0.00008975053,0.00052901206,0.0005040744],"domain_scores_gemma":[0.9934597,0.0013686116,0.0025369904,0.00018849636,0.0013757199,0.0010704416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018469231,0.000195158,0.00016927593,0.001120886,0.0006115043,0.0028048654,0.0003464983,0.0005051473,0.0015488575],"category_scores_gemma":[0.005718056,0.00011441462,0.00014466773,0.0011834595,0.00071417843,0.0008581709,0.001110021,0.0004827929,0.00032694908],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014987921,0.00076930906,0.9401834,0.00010630349,0.00008024139,0.00037473787,0.0068096807,0.0012658451,0.00245974,0.0007162697,0.00048396966,0.04660061],"study_design_scores_gemma":[0.000005653816,0.00027983644,0.98736584,0.000032059474,0.000020979009,0.00006151659,0.009597167,0.00052475836,0.00081901206,0.0001059989,0.001172638,0.0000144277665],"about_ca_topic_score_codex":0.010222806,"about_ca_topic_score_gemma":0.010203101,"teacher_disagreement_score":0.010222806,"about_ca_system_score_codex":0.0018474392,"about_ca_system_score_gemma":0.0020900527,"threshold_uncertainty_score":0.020326555},"labels":[],"label_agreement":null},{"id":"W2610358703","doi":"","title":"Discipline breakdown structure - bridging project management and systems engineering to form an integrated management system in multidisciplinary rail projects","year":2016,"lang":"en","type":"dissertation","venue":"UCL Discovery (University College London)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bespoke; Multidisciplinary approach; Project management; Engineering; Context (archaeology); Modular design; Process management; Bridging (networking); Engineering management; Consistency (knowledge bases); Work breakdown structure; Interdependence; Systems engineering; Program management; Computer science; OPM3; Business","score_opus":0.01924879666465236,"score_gpt":0.2663357323132414,"score_spread":0.24708693564858908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2610358703","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29174808,0.005354148,0.55858934,0.013943332,0.0006143105,0.0014552048,0.00014546824,0.0006753753,0.12747467],"genre_scores_gemma":[0.7805232,0.0021297296,0.1998349,0.0011839299,0.00010399259,0.00066516333,0.00017692924,0.000101713806,0.015280422],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98971516,0.005624687,0.00069186446,0.00087956793,0.0022620359,0.00082657987],"domain_scores_gemma":[0.99308044,0.0019885674,0.0011196333,0.00094192167,0.0014742996,0.0013951028],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011913276,0.00038617072,0.0003445778,0.0027647652,0.0029631585,0.007457011,0.0013474316,0.0014975322,0.0047637965],"category_scores_gemma":[0.0090528,0.0004506937,0.0006153554,0.0031271442,0.003619303,0.0062514143,0.009543187,0.0022037495,0.0013325657],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011662704,0.00050325785,0.020963976,0.0014207865,0.00007352041,0.0008346242,0.055918023,0.008144004,0.00669037,0.36105147,0.008185764,0.5360976],"study_design_scores_gemma":[0.00010406642,0.0014275528,0.036137156,0.003406229,0.00008317337,0.0024531782,0.07693315,0.022731198,0.0052457894,0.3058969,0.545454,0.0001276316],"about_ca_topic_score_codex":0.0023901456,"about_ca_topic_score_gemma":0.00304188,"teacher_disagreement_score":0.011913276,"about_ca_system_score_codex":0.0049415384,"about_ca_system_score_gemma":0.012284749,"threshold_uncertainty_score":0.063004136},"labels":[],"label_agreement":null},{"id":"W2610949061","doi":"10.21474/ijar01/3844","title":"AN INVESTIGATION INTO FACTORS AFFECTING SUCCESSFUL COMPLETION OF DEVELOPMENT PROJECTS IN PUNJAB, PAKISTAN.","year":2017,"lang":"en","type":"article","venue":"International Journal of Advanced Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Xuzhou; China; Geography; Political science; Economic growth; Socioeconomics; Ancient history; Sociology; History; Archaeology; Economics","score_opus":0.24000076225408787,"score_gpt":0.5336519887496594,"score_spread":0.2936512264955715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2610949061","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99875593,0.000041140174,0.000038490554,0.00014419698,0.000003303895,0.000021011783,0.00012724963,0.000001371428,0.00086723606],"genre_scores_gemma":[0.999084,0.00012608459,0.000115975905,0.000020541229,0.0000031455904,0.000015202503,0.0001277409,0.0000011736179,0.00050616835],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991918,0.00023319692,0.00005851189,0.000050454786,0.00014876286,0.0003172364],"domain_scores_gemma":[0.99513346,0.0009244418,0.0017451888,0.00007968152,0.00079833576,0.0013189114],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094070676,0.00023828098,0.00015489683,0.00071331393,0.0015249853,0.00095287926,0.0005137532,0.00038819932,0.0020536762],"category_scores_gemma":[0.003973853,0.0002953953,0.00017144906,0.0012293087,0.0005777943,0.00052513415,0.0006796764,0.00079527096,0.00038097307],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057985053,0.00030543696,0.9844402,0.000038159105,0.000013777071,0.00048281354,0.0047815167,0.00021377015,0.00026670427,0.0002040595,0.0006084497,0.008587118],"study_design_scores_gemma":[0.0000016275195,0.00009407179,0.98710966,0.00001534374,0.0000040474183,0.00007783771,0.011787364,0.00013765068,0.00004522067,0.000024053696,0.00069782126,0.000005229264],"about_ca_topic_score_codex":0.060540088,"about_ca_topic_score_gemma":0.13050146,"teacher_disagreement_score":0.060540088,"about_ca_system_score_codex":0.0013147446,"about_ca_system_score_gemma":0.0032563924,"threshold_uncertainty_score":0.120375395},"labels":[],"label_agreement":null},{"id":"W2615170682","doi":"10.1139/cjce-2016-0413","title":"BIM-based model for quantifying the design change time ripple effect","year":2017,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ripple; Schedule; Duration (music); Computer science; Component (thermodynamics); Reliability engineering; Engineering","score_opus":0.2208181443453473,"score_gpt":0.34106507445991263,"score_spread":0.12024693011456533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2615170682","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.056059882,0.0003629866,0.907897,0.00041615788,0.00007507581,0.00021173994,0.0016506435,0.000836821,0.032489743],"genre_scores_gemma":[0.85246,0.00072742964,0.13462652,0.000090502144,0.00002879282,0.0007722592,0.0012881713,0.0001780976,0.009828222],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992423,0.00018601655,0.000046265664,0.00010743002,0.0003287509,0.00008933705],"domain_scores_gemma":[0.9991567,0.00035828463,0.00012242413,0.0000666037,0.0002619287,0.00003398026],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001192993,0.00084427104,0.000667882,0.0014826737,0.00057191064,0.0014780492,0.0015313303,0.0012050294,0.0035228727],"category_scores_gemma":[0.0023709147,0.00056613056,0.0008595384,0.0017537453,0.00054628507,0.0013353404,0.0009490891,0.0008153547,0.0005786309],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012133925,0.000019720283,0.00046730888,0.000027572696,0.0000066459324,0.000030987514,0.000031967505,0.98887527,0.00042304336,0.004667008,0.00028833633,0.0051500895],"study_design_scores_gemma":[0.0000032851613,0.000008700731,0.00023516352,0.0000059388067,0.00000827362,0.000015921045,0.000016610586,0.9968731,0.00024115252,0.0015390114,0.0010461969,0.0000066895636],"about_ca_topic_score_codex":0.024950443,"about_ca_topic_score_gemma":0.016975885,"teacher_disagreement_score":0.024950443,"about_ca_system_score_codex":0.0018930654,"about_ca_system_score_gemma":0.0026754222,"threshold_uncertainty_score":0.049610436},"labels":[],"label_agreement":null},{"id":"W2619953970","doi":"10.5539/mas.v11n7p20","title":"Causes and Effects of Cost Overrun on Construction Project in Bahrain: Part I (Ranking of Cost Overrun Factors and Risk Mapping)","year":2017,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":58,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cost overrun; Ranking (information retrieval); Schedule; Computer science; Construction industry; Operations management; Business; Risk analysis (engineering); Construction engineering; Engineering","score_opus":0.08939548862656355,"score_gpt":0.34835246645073165,"score_spread":0.2589569778241681,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2619953970","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99637103,0.001089398,0.00041721726,0.00015538986,0.00000585273,0.00003302527,0.00017994741,0.000008931303,0.0017392974],"genre_scores_gemma":[0.99891055,0.00052383303,0.0002950399,0.000007220765,0.0000048656516,0.000006703307,0.00007217884,0.0000013720996,0.00017822333],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99719197,0.00047040707,0.00035843556,0.00020124126,0.0013161621,0.00046181038],"domain_scores_gemma":[0.99274856,0.002123043,0.0034322834,0.0001279242,0.001302508,0.00026569932],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016443297,0.00045945568,0.00032028975,0.004658425,0.0006449088,0.0015258729,0.00043348313,0.00046242587,0.0013188325],"category_scores_gemma":[0.004911326,0.0002577866,0.00054736424,0.0038614224,0.00057242106,0.000554184,0.00092164346,0.00039829055,0.00009892267],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010804945,0.00006126946,0.95030504,0.0003792207,0.00009880495,0.0017160495,0.0019593919,0.003666667,0.0015543163,0.00081677584,0.00036004945,0.038974468],"study_design_scores_gemma":[0.0000014630464,0.000094594616,0.99114007,0.00008092087,0.00006353714,0.00047786726,0.0046067215,0.0018209905,0.0006244662,0.00020122877,0.00087083376,0.000017403965],"about_ca_topic_score_codex":0.022847224,"about_ca_topic_score_gemma":0.036572818,"teacher_disagreement_score":0.022847224,"about_ca_system_score_codex":0.0026590226,"about_ca_system_score_gemma":0.0022915243,"threshold_uncertainty_score":0.045428514},"labels":[],"label_agreement":null},{"id":"W2620117668","doi":"10.5539/mas.v11n7p28","title":"Causes and Effects of Cost Overrun on Construction Project in Bahrain: Part 2 (PLS-SEM Path Modelling)","year":2017,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cost overrun; Structural equation modeling; Explanatory power; Computer science; Path analysis (statistics); Variable (mathematics); Variables; Mathematics; Construction industry; Construction engineering; Engineering; Machine learning","score_opus":0.10574765768589459,"score_gpt":0.36065423860892826,"score_spread":0.25490658092303364,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2620117668","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99510175,0.000060094862,0.0026243636,0.00017119857,0.0000073959786,0.00014374232,0.00050293974,0.000024445691,0.0013640915],"genre_scores_gemma":[0.99560744,0.00013601733,0.002867919,0.000015969337,0.000003340212,0.00016175487,0.00044079073,0.0000054494635,0.0007614205],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9988381,0.00041502988,0.00009824721,0.00021849024,0.00019554226,0.00023457756],"domain_scores_gemma":[0.99761295,0.0013991867,0.0004055627,0.0001007056,0.0003890306,0.00009259818],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020998248,0.00079805736,0.00041293606,0.0019375669,0.0006055586,0.0013398762,0.0007014063,0.0006090164,0.0043164482],"category_scores_gemma":[0.0038804677,0.00051443436,0.0013275987,0.0021670908,0.00057320343,0.00080092007,0.0013839785,0.0009069627,0.00023894804],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016245175,0.00039922615,0.92607266,0.00025886067,0.00023758788,0.00088800763,0.005803291,0.02716697,0.001419114,0.0061244867,0.0008430434,0.030624272],"study_design_scores_gemma":[0.000037509253,0.0004953996,0.838499,0.00027249358,0.0003371666,0.00037586474,0.014244934,0.13720511,0.0015134065,0.0037202772,0.0032348784,0.00006396885],"about_ca_topic_score_codex":0.03398346,"about_ca_topic_score_gemma":0.029130856,"teacher_disagreement_score":0.03398346,"about_ca_system_score_codex":0.00231261,"about_ca_system_score_gemma":0.0041700564,"threshold_uncertainty_score":0.06757134},"labels":[],"label_agreement":null},{"id":"W2620947230","doi":"10.1017/9781316662243.016","title":"Human Resource Management in Organizational Project Management","year":2017,"lang":"en","type":"book-chapter","venue":"Cambridge University Press eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Knowledge management; Business; Human resource management; Process management; Computer science; Engineering management; Engineering","score_opus":0.07522155037407086,"score_gpt":0.29416864635284407,"score_spread":0.2189470959787732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2620947230","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017017005,0.16584343,0.20746125,0.069361575,0.0060342504,0.0011002356,0.00024035148,0.00021790058,0.53272396],"genre_scores_gemma":[0.58259106,0.12667684,0.16396564,0.014014831,0.008565824,0.0031298688,0.00031736938,0.0003468057,0.100391716],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.98197305,0.011224015,0.0009938831,0.0015427422,0.0033807156,0.00088565284],"domain_scores_gemma":[0.9828278,0.010408475,0.0018317605,0.0013992069,0.002105486,0.0014273127],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016174598,0.0008251415,0.00067628775,0.0039429865,0.005121887,0.011393531,0.0025907822,0.003861032,0.014590816],"category_scores_gemma":[0.016754597,0.00057642686,0.0005597707,0.0082247555,0.016252711,0.008075639,0.0057115234,0.0047746445,0.0024584772],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001825781,0.00010695534,0.0013280966,0.0007324164,0.00002126857,0.00016197744,0.00870945,0.0020022416,0.0001363403,0.780158,0.021232063,0.18539298],"study_design_scores_gemma":[0.000015515116,0.00009285573,0.0033501883,0.002316816,0.000013361147,0.00025619552,0.009239749,0.0019099314,0.00020151243,0.50425416,0.4782918,0.000057833193],"about_ca_topic_score_codex":0.0050126333,"about_ca_topic_score_gemma":0.0041514942,"teacher_disagreement_score":0.016174598,"about_ca_system_score_codex":0.0074071363,"about_ca_system_score_gemma":0.010733669,"threshold_uncertainty_score":0.08554047},"labels":[],"label_agreement":null},{"id":"W2621135535","doi":"10.1017/9781316662243.011","title":"Project Portfolio Management","year":2017,"lang":"en","type":"book-chapter","venue":"Cambridge University Press eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Project portfolio management; Portfolio; Computer science; Content (measure theory); Business; Process management; Engineering management; Operations research; Project management; Finance; Engineering; Systems engineering; Mathematics","score_opus":0.10169136954496416,"score_gpt":0.3028652583675404,"score_spread":0.20117388882257625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2621135535","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0038841285,0.025913903,0.056942146,0.016023245,0.0022147459,0.00045742388,0.0024459816,0.0020653172,0.8900531],"genre_scores_gemma":[0.06699066,0.043378424,0.042053353,0.0027909132,0.0018183244,0.00095084135,0.006238821,0.0014388823,0.8343397],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99517244,0.0011735823,0.0004431865,0.0006125421,0.0022795398,0.0003186307],"domain_scores_gemma":[0.99466926,0.0012122451,0.0006304056,0.0012827117,0.0013688946,0.00083634176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004180189,0.0010611851,0.000740125,0.0032663392,0.0011751049,0.011858964,0.0017273896,0.0020228405,0.22775346],"category_scores_gemma":[0.013604215,0.000577494,0.00059840863,0.006081925,0.0014812062,0.006562297,0.0053159683,0.0019812756,0.10332872],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026085036,0.000049467293,0.0005474071,0.00036183884,0.000011960895,0.00008778155,0.00030667873,0.00088076654,0.0002882232,0.13321848,0.21342506,0.65079623],"study_design_scores_gemma":[0.0000060722055,0.000016517886,0.000492421,0.00040474502,0.0000036223955,0.00014431545,0.00013175381,0.00045472907,0.00015652795,0.033218857,0.96496004,0.000010463911],"about_ca_topic_score_codex":0.001740987,"about_ca_topic_score_gemma":0.0014583062,"teacher_disagreement_score":0.22775346,"about_ca_system_score_codex":0.0027848035,"about_ca_system_score_gemma":0.0048089903,"threshold_uncertainty_score":0.7619112},"labels":[],"label_agreement":null},{"id":"W2621192970","doi":"10.1017/9781316662243.006","title":"Strategic OPM","year":2017,"lang":"en","type":"book-chapter","venue":"Cambridge University Press eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Business; Process management; Strategic management; Strategic financial management; Strategic planning; Knowledge management; Marketing; Computer science","score_opus":0.1564785328958968,"score_gpt":0.3000861834961506,"score_spread":0.14360765060025382,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2621192970","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00025249238,0.00356196,0.00165522,0.0032038048,0.0014394522,0.00005792921,0.00034895426,0.0001905807,0.9892896],"genre_scores_gemma":[0.0026836195,0.003576786,0.0009946433,0.00072870427,0.00022500611,0.000051090614,0.0003087347,0.000097147225,0.99133426],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99931324,0.000071832845,0.000025083164,0.00008213087,0.00039869177,0.000108925036],"domain_scores_gemma":[0.99962485,0.000051990624,0.000013563793,0.000046582725,0.00014485317,0.00011800921],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085875945,0.0006679173,0.00039422503,0.0015279002,0.0015455105,0.0056279935,0.000834376,0.001520533,0.2979225],"category_scores_gemma":[0.0016542297,0.00030814676,0.0003500144,0.0022314016,0.00082526344,0.0033857808,0.0027976593,0.002302499,0.13999039],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000075738985,0.000020025293,0.000054893775,0.00017698106,0.000001298547,0.00004904787,0.00021810188,0.000116493844,0.00019233752,0.122695066,0.7011955,0.1752727],"study_design_scores_gemma":[5.066339e-7,0.0000023229381,0.00004875733,0.000057047037,3.5790032e-7,0.000021873482,0.000052699637,0.00002521491,0.00003673453,0.0031799548,0.9965733,0.0000012373158],"about_ca_topic_score_codex":0.0040214295,"about_ca_topic_score_gemma":0.007811552,"teacher_disagreement_score":0.2979225,"about_ca_system_score_codex":0.003858621,"about_ca_system_score_gemma":0.006145223,"threshold_uncertainty_score":0.99665004},"labels":[],"label_agreement":null},{"id":"W2621374674","doi":"10.1017/9781316662243.005","title":"The Business of Projects in and across Organizations","year":2017,"lang":"en","type":"book-chapter","venue":"Cambridge University Press eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"Digital, Internet, Materials and Engineering Co-Creation","keywords":"Business; Content (measure theory); Knowledge management; Computer science; Process management; World Wide Web; Mathematics","score_opus":0.06454523992625455,"score_gpt":0.2892655836394755,"score_spread":0.22472034371322097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2621374674","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009231398,0.009161947,0.011228221,0.014137069,0.0005158791,0.000066912784,0.00012075342,0.00015902631,0.9553787],"genre_scores_gemma":[0.2811277,0.022988718,0.010329497,0.0017890503,0.0005855696,0.00022451062,0.00030981252,0.00031728626,0.6823278],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99618125,0.0017294242,0.00008927205,0.0002965955,0.0013516115,0.00035177913],"domain_scores_gemma":[0.9981102,0.00079589814,0.0001298671,0.0002672082,0.0002556007,0.00044136093],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002433207,0.0003690175,0.0003064449,0.00080668833,0.002037088,0.013238012,0.00080454076,0.0013865464,0.03229327],"category_scores_gemma":[0.005967494,0.00029357625,0.00023084851,0.0036998757,0.00339226,0.0074738464,0.0037064955,0.0017984486,0.007986057],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022509701,0.000036996174,0.0010103823,0.00018027339,0.000010768779,0.000098507626,0.004339765,0.00082222774,0.000368398,0.59453994,0.14256226,0.25600794],"study_design_scores_gemma":[0.0000036608367,0.000024499172,0.001084469,0.00027636345,0.0000038049873,0.00010921817,0.0040277177,0.00048908987,0.00018180552,0.07191213,0.92187834,0.000009010267],"about_ca_topic_score_codex":0.0022628135,"about_ca_topic_score_gemma":0.0031545882,"teacher_disagreement_score":0.03229327,"about_ca_system_score_codex":0.002737378,"about_ca_system_score_gemma":0.0048039085,"threshold_uncertainty_score":0.10803169},"labels":[],"label_agreement":null},{"id":"W2623725241","doi":"10.1108/jkm-07-2016-0273","title":"Capturing knowledge from lessons learned at the work package level in project engineering teams","year":2017,"lang":"en","type":"article","venue":"Journal of Knowledge Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Experiential learning; Computer science; Project management; Knowledge management; Process (computing); Context (archaeology); Scope (computer science); Work breakdown structure; Project planning; Engineering management; Process management; OPM3; Engineering; Systems engineering","score_opus":0.22579948603522296,"score_gpt":0.4136156167442664,"score_spread":0.18781613070904343,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2623725241","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8875413,0.00039667203,0.08836762,0.0006531156,0.000039623475,0.00091813656,0.00035191237,0.00022538236,0.021506213],"genre_scores_gemma":[0.9381293,0.00035351078,0.056788016,0.00013940752,0.000015067518,0.0006369378,0.0005348254,0.00004898745,0.0033539033],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9947345,0.0029606535,0.00026387654,0.0006448479,0.0010251559,0.0003710695],"domain_scores_gemma":[0.98351026,0.009829437,0.0018035369,0.0017387612,0.002368846,0.0007491907],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00509878,0.0005248509,0.00032950466,0.002948431,0.0010692292,0.0044045853,0.0012318341,0.0010833638,0.0016584022],"category_scores_gemma":[0.028205613,0.000452326,0.00043954182,0.0018022569,0.0013679119,0.004625514,0.0037775484,0.0013092965,0.00062565546],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002975403,0.0015436991,0.08819077,0.001380519,0.000096690834,0.0013611816,0.23103464,0.007027787,0.0071209124,0.007213291,0.0032176613,0.6515153],"study_design_scores_gemma":[0.00015852603,0.004932487,0.3241706,0.005367313,0.00028001756,0.0018392621,0.42231286,0.057747804,0.025786478,0.057983883,0.09893392,0.00048689276],"about_ca_topic_score_codex":0.0027800102,"about_ca_topic_score_gemma":0.0045525986,"teacher_disagreement_score":0.00509878,"about_ca_system_score_codex":0.0023229534,"about_ca_system_score_gemma":0.0031074155,"threshold_uncertainty_score":0.0269652},"labels":[],"label_agreement":null},{"id":"W2624818832","doi":"10.7492/ijaec.2016.005","title":"Investigating and Ranking Labor Factors Productivity in Egyptian Construction Industry","year":2016,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Ranking (information retrieval); Productivity; Business; Industrial organization; Computer science; Economics; Economic growth; Information retrieval","score_opus":0.02041384587286628,"score_gpt":0.2827003189995845,"score_spread":0.2622864731267182,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2624818832","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99597037,0.00026047637,0.00080651935,0.00007779529,0.0000027405522,0.000017328835,0.00017625386,0.0000057380953,0.0026828768],"genre_scores_gemma":[0.9985983,0.00020339563,0.000568853,0.0000058862947,0.0000021281837,0.00000892658,0.00014851835,0.0000011709081,0.00046278947],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99917006,0.00014919438,0.0000790508,0.000053035863,0.00034870763,0.00019982817],"domain_scores_gemma":[0.9983424,0.000560918,0.0004553929,0.0000405275,0.00050022046,0.0001006513],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010756877,0.00025224563,0.00017709636,0.003918155,0.00040732842,0.0011499982,0.00017971585,0.00015573045,0.0018099291],"category_scores_gemma":[0.003381745,0.00008610618,0.0002024365,0.0036500737,0.0002847668,0.00038719754,0.0004400241,0.00014036095,0.00024152783],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016411961,0.000107711654,0.87385523,0.0003033322,0.00006639651,0.00029511118,0.0040563904,0.0028955233,0.002358889,0.0012219988,0.00066126336,0.11401413],"study_design_scores_gemma":[0.0000035374221,0.00011063736,0.9802004,0.000048466452,0.000021018192,0.00007492184,0.012677822,0.0027029272,0.0010993327,0.00026354205,0.0027848987,0.000012598286],"about_ca_topic_score_codex":0.014531659,"about_ca_topic_score_gemma":0.015514424,"teacher_disagreement_score":0.014531659,"about_ca_system_score_codex":0.0014348673,"about_ca_system_score_gemma":0.0013046638,"threshold_uncertainty_score":0.028894186},"labels":[],"label_agreement":null},{"id":"W263858768","doi":"","title":"A Contribution to Knowledge Management through a Canadian Research Initiative","year":2006,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Knowledge management; Tacit knowledge; Personal knowledge management; Knowledge value chain; Explicit knowledge; Organizational learning; Asset (computer security); Knowledge economy; Subconscious; Business; Procedural knowledge; Knowledge engineering; Domain knowledge; Computer science","score_opus":0.2534898537636504,"score_gpt":0.4748810600403898,"score_spread":0.22139120627673942,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W263858768","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00669421,0.01934454,0.007134732,0.6069293,0.0076550413,0.00046845764,0.0020194715,0.00051498925,0.34923923],"genre_scores_gemma":[0.20709524,0.04476075,0.06502434,0.09882238,0.0029895692,0.0006655088,0.0042550643,0.00082871865,0.5755585],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9708092,0.005434218,0.0009591634,0.002188832,0.015073471,0.005535155],"domain_scores_gemma":[0.9148456,0.00858459,0.0017817504,0.0035502005,0.03830708,0.03293077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.030466251,0.001030161,0.0010191338,0.008930734,0.022646755,0.023249429,0.0043312614,0.0064634224,0.019721894],"category_scores_gemma":[0.03400576,0.0007421845,0.0014520654,0.009064541,0.0117484145,0.008369737,0.012602506,0.007287594,0.0040662796],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":true,"study_design_scores_codex":[0.00007071812,0.00017354674,0.0025171041,0.0003742105,0.00003182467,0.0006657657,0.007446122,0.00034150394,0.000586632,0.3028128,0.54997236,0.1350074],"study_design_scores_gemma":[0.000013910704,0.000014927537,0.00212537,0.00028271365,0.000010645444,0.000101982405,0.003166596,0.00026072338,0.00013992726,0.006996603,0.9868558,0.000030836592],"about_ca_topic_score_codex":0.9562092,"about_ca_topic_score_gemma":0.9512657,"teacher_disagreement_score":0.81109965,"about_ca_system_score_codex":0.18890034,"about_ca_system_score_gemma":0.5125587,"threshold_uncertainty_score":0.9407606},"labels":[],"label_agreement":null},{"id":"W2664539733","doi":"10.6000/1927-5129.2017.13.58","title":"Impact of Project Complexity and Environmental Factors on Project Success: A Case of Oil and Gas Sector of Pakistan","year":2017,"lang":"en","type":"article","venue":"Journal of Basic & Applied Sciences","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Petroleum industry; Interdependence; Fossil fuel; Environmental impact assessment; Structural equation modeling; Business; Petroleum; Project management; Environmental economics; Environmental science; Computer science; Engineering; Economics; Waste management; Environmental engineering; Political science; Systems engineering","score_opus":0.14052398949059217,"score_gpt":0.408476529487665,"score_spread":0.2679525399970728,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2664539733","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9987388,0.000016380951,0.0001895996,0.00008907133,6.7291074e-7,0.000019561878,0.000015780655,0.0000011689506,0.0009288981],"genre_scores_gemma":[0.9994165,0.00007568144,0.00022959177,0.0000056049525,0.0000011001182,0.000011057883,0.000014134159,8.4414654e-7,0.00024550248],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99782735,0.0011727429,0.00009292331,0.000089018984,0.00026465938,0.0005533113],"domain_scores_gemma":[0.98977715,0.0057622893,0.0016716127,0.00024718302,0.000973322,0.0015684626],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025700843,0.00034548386,0.0002567642,0.0013485793,0.0027969223,0.0017340108,0.0006048489,0.00069332327,0.0021642756],"category_scores_gemma":[0.0049756644,0.0002515885,0.00040021774,0.001514769,0.0012046093,0.0009829131,0.0015796511,0.0008286388,0.00019400955],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006174124,0.0021014365,0.85590786,0.00023735478,0.00013440965,0.030493835,0.031965487,0.024176074,0.0027371931,0.0071156644,0.0012069686,0.043306425],"study_design_scores_gemma":[0.00008559611,0.0027645973,0.7173444,0.00022187717,0.00015699095,0.0057073873,0.20781739,0.053835187,0.0029065923,0.003321203,0.0057146098,0.00012422205],"about_ca_topic_score_codex":0.02069772,"about_ca_topic_score_gemma":0.035457816,"teacher_disagreement_score":0.02069772,"about_ca_system_score_codex":0.0026575045,"about_ca_system_score_gemma":0.0034643437,"threshold_uncertainty_score":0.041154504},"labels":[],"label_agreement":null},{"id":"W2669437480","doi":"10.19255/jmpm251","title":"Proactive tactical planning approach for large scale engineering and construction projects","year":2017,"lang":"en","type":"article","venue":"Open Archive Toulouse Archive Ouverte (University of Toulouse)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Robustness (evolution); Project management; Project planning; Contingency; Computer science; Contingency plan; Aggregate (composite); Resource (disambiguation); Operations research; Scale (ratio); Engineering; Risk analysis (engineering); Industrial engineering; Systems engineering; Reliability engineering","score_opus":0.07624651867423142,"score_gpt":0.31836132593782435,"score_spread":0.2421148072635929,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2669437480","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043381315,0.00020796088,0.95234877,0.0001403764,0.000014262828,0.000094095536,0.00011508767,0.00032834613,0.0033697763],"genre_scores_gemma":[0.8363557,0.00022031461,0.16170132,0.000037917147,0.000011267297,0.00021422382,0.00017832538,0.00003532161,0.0012456392],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9994981,0.0001809736,0.00002521171,0.000086211905,0.00013123715,0.0000782199],"domain_scores_gemma":[0.9992403,0.00042999923,0.00012772251,0.00006600821,0.00007742869,0.000058571342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009918597,0.00068086083,0.0006531429,0.0006974752,0.00036487606,0.001090284,0.0008947938,0.0005476896,0.001673871],"category_scores_gemma":[0.0014131577,0.00044067262,0.0004217984,0.0008182318,0.0004263944,0.0006120973,0.00091155083,0.0006149096,0.00015966906],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024595238,0.000020614825,0.00021200732,0.000028000168,0.000022083665,0.000047113073,0.000044499157,0.9768176,0.0010813038,0.0029400173,0.00021015896,0.018551908],"study_design_scores_gemma":[0.000004738861,0.000027904634,0.00013676687,0.0000034156214,0.000007487731,0.000014200005,0.000020504109,0.9969971,0.00032809016,0.0021056696,0.00035057162,0.0000035385697],"about_ca_topic_score_codex":0.005900747,"about_ca_topic_score_gemma":0.007534262,"teacher_disagreement_score":0.005900747,"about_ca_system_score_codex":0.0007269993,"about_ca_system_score_gemma":0.0019555916,"threshold_uncertainty_score":0.011732817},"labels":[],"label_agreement":null},{"id":"W2690852292","doi":"10.7492/ijaec.2017.002","title":"The Combinational Connotation of Contract Strategy in Chinese Public Construction Projects: A Grounded Theory Approach","year":2017,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Connotation; Grounded theory; Business; Engineering ethics; Engineering; Sociology; Qualitative research; Social science; Philosophy; Linguistics","score_opus":0.02852733881345184,"score_gpt":0.31007840245337637,"score_spread":0.28155106363992455,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2690852292","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8328746,0.0008793305,0.038049288,0.002812382,0.0000437522,0.00024414307,0.00012375081,0.000024342826,0.1249484],"genre_scores_gemma":[0.99679154,0.000094407435,0.002513239,0.000035692945,0.0000028107224,0.00004170322,0.000021941123,0.0000074402938,0.0004911812],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9947752,0.0030857834,0.0002517706,0.0003839871,0.0010881781,0.00041514155],"domain_scores_gemma":[0.9923539,0.0056645023,0.000651624,0.0004293144,0.0006322018,0.0002684675],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004186808,0.0005258068,0.00034101517,0.0044983327,0.004002667,0.005468854,0.0015257254,0.0011954323,0.0019824782],"category_scores_gemma":[0.008643508,0.0004766365,0.00036472254,0.0067860484,0.014050074,0.0071144933,0.0029446476,0.0014705377,0.000092710216],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008665365,0.00008131356,0.021292707,0.0003055201,0.000051434385,0.00065927114,0.33740827,0.0014734006,0.001239551,0.60523665,0.0005518186,0.031613298],"study_design_scores_gemma":[0.0000771623,0.00014997082,0.07396713,0.0012163408,0.000217085,0.0011473675,0.5551468,0.027191779,0.0024066218,0.30737752,0.030975694,0.00012649663],"about_ca_topic_score_codex":0.0216423,"about_ca_topic_score_gemma":0.027573524,"teacher_disagreement_score":0.0216423,"about_ca_system_score_codex":0.009950164,"about_ca_system_score_gemma":0.009861145,"threshold_uncertainty_score":0.0721938},"labels":[],"label_agreement":null},{"id":"W2707921866","doi":"10.4018/978-1-5225-2255-3.ch315","title":"Project Management in Government","year":2017,"lang":"en","type":"book-chapter","venue":"IGI Global eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Business; Government (linguistics); Process management; Philosophy; Linguistics","score_opus":0.08456567377357771,"score_gpt":0.35379926369741066,"score_spread":0.26923358992383295,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2707921866","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034597744,0.1283043,0.004144439,0.033458836,0.0009850863,0.00004838459,0.000100740064,0.00015307823,0.8293453],"genre_scores_gemma":[0.13028449,0.14510174,0.0064080646,0.004274431,0.0007583123,0.00016567431,0.00019437425,0.0001694263,0.7126435],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993129,0.00033735813,0.000022129243,0.00004555225,0.00020653287,0.00007546078],"domain_scores_gemma":[0.9996816,0.0001523739,0.000024136569,0.00002673469,0.00004797315,0.00006709815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00087858224,0.00041278984,0.00028518194,0.00079594564,0.001474621,0.0049785054,0.00039321033,0.001422061,0.0268541],"category_scores_gemma":[0.0011851817,0.00022412727,0.00015075086,0.0034586657,0.002377704,0.0026448849,0.0016490945,0.0018858731,0.0069227708],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000056988133,0.00003237456,0.0002472649,0.0003075045,0.0000045176353,0.000077385506,0.0030454374,0.00051851437,0.00014789811,0.37543425,0.38922462,0.23095453],"study_design_scores_gemma":[0.0000021070841,0.0000101574915,0.0005220587,0.00069423823,0.0000018112081,0.000067106295,0.002014831,0.0001868253,0.000049325034,0.06794433,0.92850333,0.0000038885782],"about_ca_topic_score_codex":0.004044459,"about_ca_topic_score_gemma":0.011043466,"teacher_disagreement_score":0.0268541,"about_ca_system_score_codex":0.003702724,"about_ca_system_score_gemma":0.0045227134,"threshold_uncertainty_score":0.08983588},"labels":[],"label_agreement":null},{"id":"W2731223921","doi":"10.19255/jmpm263","title":"Audit as a tool for project maturity certification in heavy civil construction","year":2017,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Certification; Audit; Maturity (psychological); Process management; Business; Productivity; Project management; Engineering management; Operations management; Accounting; Engineering; Management; Systems engineering; Economics","score_opus":0.13487847404621056,"score_gpt":0.4064920125162717,"score_spread":0.27161353847006114,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2731223921","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9392092,0.00036582572,0.048383772,0.00063123985,0.000046419962,0.0004248852,0.00019013607,0.00059625425,0.010152163],"genre_scores_gemma":[0.98443294,0.00007296312,0.014828967,0.000015686448,0.0000053261742,0.000054921988,0.00005898353,0.000011556473,0.00051864533],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9879518,0.00809948,0.0007104716,0.0003363045,0.002384439,0.00051742897],"domain_scores_gemma":[0.93081653,0.04168841,0.01077097,0.0041440614,0.010589248,0.0019907579],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015012047,0.00033051678,0.00041268597,0.00487126,0.0010917776,0.0022158308,0.0005052983,0.0005766906,0.0014223089],"category_scores_gemma":[0.048896726,0.00029432256,0.00016144832,0.0030359942,0.000920247,0.0020306576,0.0015892673,0.00069787545,0.00025996525],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013037468,0.0008289956,0.40579653,0.00045930417,0.000041971347,0.0007974506,0.009400889,0.017747482,0.0060645784,0.010385206,0.0031822324,0.54399157],"study_design_scores_gemma":[0.0001286446,0.0030551662,0.7311965,0.001325904,0.00017963267,0.0020363037,0.023558626,0.18363988,0.021839602,0.011511587,0.021172807,0.00035537043],"about_ca_topic_score_codex":0.003878024,"about_ca_topic_score_gemma":0.0047589727,"teacher_disagreement_score":0.015012047,"about_ca_system_score_codex":0.0018662616,"about_ca_system_score_gemma":0.0038241765,"threshold_uncertainty_score":0.079392195},"labels":[],"label_agreement":null},{"id":"W2734618222","doi":"10.24928/2017/0057","title":"Design-Build and Design-Bid-Build in Construction- a Comparative Review","year":2017,"lang":"en","type":"review","venue":"Annual Conference of the International Group for Lean Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Integrated project delivery; Schedule; Computer science; Quality (philosophy); Sustainability; Key (lock); Work (physics); Design–build; Systems engineering; Process management; Risk analysis (engineering); Engineering management; Project management; Engineering; Business","score_opus":0.3898300085720151,"score_gpt":0.4605304127160458,"score_spread":0.07070040414403067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2734618222","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00051387784,0.99801695,0.00022918632,0.00018934047,0.00006099194,0.00001481679,0.000010945604,0.00000209192,0.0009617817],"genre_scores_gemma":[0.0061472207,0.9929404,0.0005620247,0.00012383425,0.000038835475,0.000023209988,0.000022057922,0.0000021512526,0.00014023189],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99620855,0.001327318,0.0007272762,0.00030959863,0.0012736494,0.00015363854],"domain_scores_gemma":[0.98783594,0.009683076,0.0008878084,0.00017591477,0.0012604507,0.00015681452],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0055964463,0.00087839476,0.0014771713,0.00577464,0.0005428316,0.0024532136,0.0012893614,0.0016332079,0.0024480668],"category_scores_gemma":[0.011127957,0.00061799673,0.00090747356,0.013020018,0.0010731212,0.0027623642,0.0010615041,0.0010429035,0.00049771235],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012342782,0.00014022665,0.0009787204,0.18402153,0.00033781913,0.00017660334,0.00073732104,0.00061975606,0.00046747853,0.010927359,0.0064466996,0.79502296],"study_design_scores_gemma":[0.000054790282,0.0004940003,0.008678218,0.12933703,0.0013205529,0.0017560475,0.002539952,0.0003628713,0.0012412618,0.0045361705,0.8495901,0.00008893052],"about_ca_topic_score_codex":0.00418714,"about_ca_topic_score_gemma":0.00868946,"teacher_disagreement_score":0.00577464,"about_ca_system_score_codex":0.002637001,"about_ca_system_score_gemma":0.006575824,"threshold_uncertainty_score":0.029597163},"labels":[],"label_agreement":null},{"id":"W2735135485","doi":"","title":"Vurdering af transportprojekter – usikkerhed og risikoanalyse","year":2013,"lang":"da","type":"article","venue":"Technical University of Denmark, DTU Orbit (Technical University of Denmark, DTU)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Computer science","score_opus":0.03235615897007177,"score_gpt":0.2519575812727873,"score_spread":0.2196014223027155,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2735135485","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.52699894,0.076063216,0.04010049,0.08494096,0.0027062474,0.0018382282,0.014732778,0.00060548715,0.2520137],"genre_scores_gemma":[0.856126,0.036194865,0.019424077,0.006088041,0.00067634863,0.001596635,0.0063105156,0.00060687953,0.07297655],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9870291,0.004992121,0.0010607269,0.0016949303,0.003982359,0.0012408455],"domain_scores_gemma":[0.9672956,0.018121852,0.0038679736,0.0017465858,0.007089118,0.0018788896],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013552227,0.0011806875,0.0012230817,0.0040555513,0.0029903243,0.013109731,0.0016587339,0.0017838954,0.04299445],"category_scores_gemma":[0.043253202,0.000786645,0.0026032361,0.005092814,0.0031113606,0.008237484,0.00450832,0.00484967,0.0064295703],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016397666,0.0011436134,0.22969292,0.008477376,0.0014788196,0.0016348214,0.05887796,0.0038625894,0.0014633315,0.08616057,0.09659348,0.5089748],"study_design_scores_gemma":[0.00017510496,0.0011091371,0.22686675,0.012537311,0.0013307969,0.0017190762,0.12757717,0.0034207709,0.0030885972,0.07797251,0.5438252,0.00037761655],"about_ca_topic_score_codex":0.038228076,"about_ca_topic_score_gemma":0.031647652,"teacher_disagreement_score":0.04299445,"about_ca_system_score_codex":0.00932931,"about_ca_system_score_gemma":0.014049598,"threshold_uncertainty_score":0.14383072},"labels":[],"label_agreement":null},{"id":"W2737226774","doi":"10.11575/prism/10230","title":"The 13th International CDIO Conference Proceedings - Full Papers","year":2017,"lang":"en","type":"article","venue":"PRISM (University of Calgary)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"CDIO; Political science; Engineering ethics; Library science; Engineering; Engineering education; Computer science; Engineering management","score_opus":0.044402903463931984,"score_gpt":0.27884535098646773,"score_spread":0.23444244752253574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2737226774","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028374214,0.052996613,0.010923096,0.025565583,0.3312464,0.00094658585,0.0055973204,0.0026272556,0.5672598],"genre_scores_gemma":[0.011247849,0.029850287,0.006047367,0.007836031,0.04063793,0.00074212515,0.009038383,0.002156756,0.8924433],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9943322,0.00052858226,0.00039668614,0.000626695,0.003489595,0.00062613847],"domain_scores_gemma":[0.98742235,0.00091780396,0.0004806342,0.0009140244,0.0075973473,0.002667857],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0045012017,0.0014007257,0.0012884609,0.0043072603,0.0021064498,0.016340043,0.0027649992,0.003601847,0.35574484],"category_scores_gemma":[0.010495804,0.0005630696,0.0014290791,0.0029072273,0.0010407805,0.0063706087,0.005144746,0.0044419016,0.28920802],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007889973,0.00007376614,0.00012438443,0.00059950125,0.000016332315,0.000119290904,0.00006939859,0.00010561334,0.001000259,0.0033576863,0.926305,0.06814989],"study_design_scores_gemma":[0.000006759675,0.000015982727,0.00013956804,0.00023363756,0.0000049982905,0.00007801094,0.00006264716,0.000036838974,0.00027522747,0.0005480804,0.9985902,0.000008113908],"about_ca_topic_score_codex":0.0013744262,"about_ca_topic_score_gemma":0.0017509676,"teacher_disagreement_score":0.35574484,"about_ca_system_score_codex":0.0030821958,"about_ca_system_score_gemma":0.0053993585,"threshold_uncertainty_score":0.9189518},"labels":[],"label_agreement":null},{"id":"W2739683093","doi":"10.5539/jsd.v10n4p130","title":"Risk Analysis of Tender Documents on the Execution of Private Construction Work at Badung Regency, Bali Province, Indonesia","year":2017,"lang":"en","type":"article","venue":"Journal of Sustainable Development","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universitas Udayana","keywords":"Business; Brainstorming; Work (physics); Risk assessment; Operations management; Competence (human resources); Data collection; Actuarial science; Finance; Marketing; Engineering; Economics; Management; Sociology","score_opus":0.03339977696065049,"score_gpt":0.3096185776959263,"score_spread":0.2762188007352758,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2739683093","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9945175,0.00015352716,0.00090301485,0.00012833756,0.000008365939,0.00016612056,0.00021099742,0.000015487603,0.0038965775],"genre_scores_gemma":[0.99641126,0.0001825358,0.0011900071,0.000016447972,0.0000073363444,0.00009780505,0.00022403903,0.000010132916,0.0018603953],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9858516,0.004308398,0.0013269541,0.0005426329,0.007211157,0.00075929915],"domain_scores_gemma":[0.9587123,0.015296232,0.015425166,0.0013665379,0.0083120605,0.00088773284],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008695871,0.0005134411,0.00034641885,0.0045247083,0.0016756065,0.0022996005,0.00089747616,0.00059661386,0.0026684452],"category_scores_gemma":[0.026701353,0.00038050613,0.00054941163,0.0032613364,0.0010301778,0.0013539689,0.0020066488,0.0006207958,0.0004187739],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021462769,0.00066468207,0.69826734,0.001234191,0.000168413,0.0068282313,0.102394395,0.0065502175,0.0057398193,0.0032940113,0.003771175,0.16894117],"study_design_scores_gemma":[0.000024713252,0.0012731901,0.84458786,0.0005894202,0.000098646386,0.0015815615,0.13286988,0.006943915,0.0025569915,0.0010892617,0.0082622925,0.00012223795],"about_ca_topic_score_codex":0.007381713,"about_ca_topic_score_gemma":0.009731871,"teacher_disagreement_score":0.008695871,"about_ca_system_score_codex":0.0048008477,"about_ca_system_score_gemma":0.0024924336,"threshold_uncertainty_score":0.04598874},"labels":[],"label_agreement":null},{"id":"W2740151580","doi":"10.17722/ijme.v9i1.341","title":"Strategies to Implement the Baldrige Criteria for Performance Excellence","year":2017,"lang":"en","type":"article","venue":"International Journal of Management Excellence","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Excellence; Process management; Computer science; Business; Management science; Engineering management; Engineering; Political science","score_opus":0.13977713801135924,"score_gpt":0.46477895773655004,"score_spread":0.3250018197251908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2740151580","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27532858,0.002985943,0.21639664,0.07852679,0.0011043719,0.008394831,0.00017074408,0.00095569494,0.41613647],"genre_scores_gemma":[0.8223364,0.0006629759,0.15185796,0.005590321,0.00010072966,0.0018374518,0.000120848956,0.00010566693,0.017387625],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9470914,0.02383318,0.0046834187,0.0026876905,0.017262748,0.004441667],"domain_scores_gemma":[0.9426761,0.016220178,0.007866046,0.004061655,0.022853315,0.0063226824],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.05240969,0.0007186226,0.0006356751,0.005043954,0.006034852,0.00830229,0.0021575226,0.0024746493,0.0032501842],"category_scores_gemma":[0.06723944,0.00033443034,0.00070837344,0.0026983363,0.0054819696,0.004954042,0.013102057,0.002752903,0.0010153077],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001101185,0.000781408,0.07049137,0.0010522212,0.000099173914,0.0010239139,0.05364643,0.0032532935,0.004069488,0.28884947,0.055119015,0.52150416],"study_design_scores_gemma":[0.00013855504,0.001673817,0.1012222,0.0027753352,0.00006919244,0.0016472668,0.08275437,0.007981224,0.007545809,0.1632061,0.63047034,0.00051572366],"about_ca_topic_score_codex":0.0056927907,"about_ca_topic_score_gemma":0.01131901,"teacher_disagreement_score":0.05240969,"about_ca_system_score_codex":0.008373933,"about_ca_system_score_gemma":0.024879217,"threshold_uncertainty_score":0.27717227},"labels":[],"label_agreement":null},{"id":"W2743275472","doi":"","title":"COSIMA-VEJ – Software Applied towards Project Evaluation in the Danish Road Sector: COSIMA-VEJ – Software til projektvurdering i den danske vejsektor","year":2005,"lang":"da","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Software; Danish; Business; Advertising; Computer science; Operating system","score_opus":0.105876365402761,"score_gpt":0.36385135687022063,"score_spread":0.2579749914674596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2743275472","genre_codex":"methods","genre_gemma":"software","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"software","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14246598,0.0054977136,0.7037336,0.0036516667,0.0008483617,0.0010275167,0.003770962,0.027353685,0.11165056],"genre_scores_gemma":[0.46847957,0.0030141678,0.47318375,0.0003105476,0.00013850356,0.00074466557,0.006639161,0.0066207456,0.04086888],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99060726,0.004285103,0.001039749,0.0007900599,0.0027543893,0.0005233893],"domain_scores_gemma":[0.98442173,0.009014846,0.00069742365,0.0021374768,0.0030545,0.0006741088],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010217928,0.00092928926,0.0007363871,0.0030542994,0.0014246772,0.00749318,0.0010956002,0.001958722,0.010025262],"category_scores_gemma":[0.020582728,0.001037299,0.00094489625,0.0035340153,0.0013579024,0.003686385,0.0027643852,0.0014063529,0.0024034109],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010546409,0.0005482146,0.012502981,0.0020804368,0.00030401052,0.00051897136,0.009596879,0.039192602,0.02272114,0.11241836,0.036090452,0.76297134],"study_design_scores_gemma":[0.0005300008,0.000849461,0.03213311,0.0014120031,0.00039121386,0.0011802689,0.004141287,0.1706625,0.05785296,0.06015412,0.6701561,0.00053704664],"about_ca_topic_score_codex":0.025903963,"about_ca_topic_score_gemma":0.02136117,"teacher_disagreement_score":0.025903963,"about_ca_system_score_codex":0.0024777388,"about_ca_system_score_gemma":0.0066881957,"threshold_uncertainty_score":0.054038227},"labels":[],"label_agreement":null},{"id":"W2750478428","doi":"10.24200/sci.2017.4171","title":"Modeling Labor Productivity in Construction Projects using Hybrid SD-DES Approach","year":2017,"lang":"en","type":"article","venue":"Scientia Iranica","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Productivity; Context (archaeology); Productivity model; Computer science; Discrete event simulation; Econometrics; Economics; Simulation; Total factor productivity; Macroeconomics","score_opus":0.22870192206602902,"score_gpt":0.39057093268704174,"score_spread":0.16186901062101272,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2750478428","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3282469,0.00031902155,0.65496105,0.00039751024,0.00005722944,0.00016391436,0.000642575,0.00022128933,0.01499053],"genre_scores_gemma":[0.9761469,0.00023263224,0.019444749,0.000026256901,0.000013430858,0.00020154235,0.00022890334,0.000016174032,0.0036894572],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957734,0.00017256425,0.000026688545,0.00008791272,0.00006977015,0.0000657175],"domain_scores_gemma":[0.9991592,0.0005190392,0.00011237061,0.000037136557,0.00012903567,0.00004331711],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006375749,0.00068390014,0.0005929202,0.0006638754,0.00032532262,0.0011525019,0.00092426135,0.0009395629,0.0023021454],"category_scores_gemma":[0.0015242558,0.0004189466,0.0009726579,0.0006997022,0.0004360853,0.0006584994,0.00088461774,0.0006042724,0.00022151502],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011284158,0.00001740413,0.0010750018,0.000014300567,0.000011534493,0.000023497736,0.00002159494,0.9955621,0.00023979122,0.001420336,0.000033951914,0.0015692319],"study_design_scores_gemma":[0.000002677902,0.000011513632,0.00023438211,0.000002706155,0.0000035983016,0.0000045051406,0.00001664217,0.99872476,0.00008539066,0.0007667806,0.00014426428,0.000002726719],"about_ca_topic_score_codex":0.01674957,"about_ca_topic_score_gemma":0.008700048,"teacher_disagreement_score":0.01674957,"about_ca_system_score_codex":0.0010875646,"about_ca_system_score_gemma":0.0011096764,"threshold_uncertainty_score":0.033304155},"labels":[],"label_agreement":null},{"id":"W2752453579","doi":"10.13169/workorgalaboglob.7.1.0076","title":"IT firms' working time (de)regulation model: a by-product of risk management strategy and project-based work management","year":2013,"lang":"en","type":"article","venue":"Work Organisation Labour & Globalisation","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec; Université TÉLUQ; Université du Québec à Montréal","funders":"Social Sciences and Humanities Research Council of Canada","keywords":"Overtime; Workforce; Work (physics); Product (mathematics); Unpaid work; Capital (architecture); Business; Risk management; Labour economics; Economics; Marketing; Industrial organization; Management; Engineering; Economic growth","score_opus":0.030751312957488054,"score_gpt":0.2866443614520027,"score_spread":0.25589304849451466,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2752453579","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61593676,0.00064312335,0.20105985,0.0071791345,0.00004385827,0.00028068727,0.00011146578,0.00008929517,0.17465597],"genre_scores_gemma":[0.99290246,0.00009641378,0.004450191,0.00010458064,0.0000061477585,0.00009262451,0.000021164073,0.0000057176057,0.0023206489],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9943328,0.0025291878,0.0003091796,0.0009189914,0.0012940997,0.0006156997],"domain_scores_gemma":[0.9872699,0.0068530133,0.0028852236,0.0013400612,0.0009545845,0.0006972396],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004193633,0.00030276086,0.00017051001,0.0013102344,0.001366129,0.0052518537,0.0015838321,0.0012648815,0.0019990648],"category_scores_gemma":[0.008857066,0.00029943045,0.00032421973,0.0011515734,0.0068846513,0.0031833777,0.002165622,0.0012748331,0.00028153707],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001174278,0.00034175866,0.072761886,0.00020649216,0.00004511763,0.0006372331,0.076719835,0.0121607175,0.004164267,0.73202294,0.0021343995,0.09868805],"study_design_scores_gemma":[0.00012872604,0.00081344025,0.30065277,0.00071879535,0.000108815715,0.0017058686,0.115645014,0.09001886,0.0055204374,0.3132066,0.17113476,0.00034603637],"about_ca_topic_score_codex":0.014299223,"about_ca_topic_score_gemma":0.012278086,"teacher_disagreement_score":0.014299223,"about_ca_system_score_codex":0.0059713004,"about_ca_system_score_gemma":0.0044469587,"threshold_uncertainty_score":0.043325007},"labels":[],"label_agreement":null},{"id":"W2753486043","doi":"10.1111/jonm.12505","title":"Innovation in health service management: Adoption of project management offices to support major health care transformation","year":2017,"lang":"en","type":"article","venue":"Journal of Nursing Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Centre Intégré Universitaire de Santé et de Services Sociaux du Centre-Sud-de-l'Île-de-Montréal; Centre Hospitalier de l’Université de Montréal; McGill University; Centre Intégré Universitaire de Santé et de Services Sociaux du Saguenay–Lac-Saint-Jean; Centre Hospitalier Universitaire Sainte-Justine; Université du Québec à Montréal; Lakeshore General Hospital; McGill University Health Centre","funders":"Fonds de Recherche du Québec - Santé; Canadian Institutes of Health Research","keywords":"Business; Context (archaeology); Knowledge management; Project management; Health care; Change management (ITSM); Service (business); OPM3; Program management; Project stakeholder; Process management; Marketing; Management; Computer science","score_opus":0.13201699892775381,"score_gpt":0.45081561194577086,"score_spread":0.31879861301801704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2753486043","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9550001,0.00060921756,0.008633953,0.011219378,0.000120275574,0.00097122235,0.000045502027,0.00013233873,0.023268051],"genre_scores_gemma":[0.98795867,0.00032189704,0.00979601,0.00057494786,0.000044030618,0.00023106724,0.00003180153,0.000017286615,0.0010242488],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.97132325,0.019939067,0.0009794179,0.000763493,0.0043470734,0.0026477142],"domain_scores_gemma":[0.93414813,0.029653573,0.012583756,0.0037405908,0.0060319337,0.013842086],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.025310148,0.00029456592,0.0002542046,0.0011901695,0.002274945,0.0046131527,0.0012318041,0.0010389809,0.0029777777],"category_scores_gemma":[0.07462585,0.0002953249,0.00050205836,0.0011083822,0.0024540292,0.0022725437,0.0059425533,0.0022600645,0.0004411505],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031723082,0.0029186057,0.2612304,0.0012250375,0.00010685074,0.0010143756,0.087864034,0.0011090573,0.0031705904,0.011114344,0.009723844,0.6202056],"study_design_scores_gemma":[0.0003240722,0.0063236803,0.6210698,0.0026373847,0.00017704308,0.0024246173,0.21802206,0.0072398265,0.0038997054,0.012637486,0.1250465,0.00019783647],"about_ca_topic_score_codex":0.0026293646,"about_ca_topic_score_gemma":0.0043502627,"teacher_disagreement_score":0.025310148,"about_ca_system_score_codex":0.0041737407,"about_ca_system_score_gemma":0.021050146,"threshold_uncertainty_score":0.13385445},"labels":[],"label_agreement":null},{"id":"W2754979845","doi":"10.1139/cjce-2017-0237","title":"A data-driven approach for identifying project manager competency weights","year":2017,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Weighting; Key (lock); Computer science; Project manager; Space (punctuation); Subjectivity; Operations research; Process management; Knowledge management; Project management; Management science; Engineering management; Systems engineering; Engineering; Computer security","score_opus":0.1591983391218792,"score_gpt":0.3487098294772891,"score_spread":0.18951149035540993,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2754979845","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.049638417,0.00009084456,0.9418662,0.00068121596,0.000054773085,0.00076182926,0.0040911487,0.00091992004,0.0018956416],"genre_scores_gemma":[0.2811435,0.0000694981,0.7107257,0.00014111435,0.000026658745,0.0018095325,0.005243324,0.000096216936,0.00074453646],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9918934,0.0038690632,0.00072114886,0.0014574388,0.001837109,0.0002218205],"domain_scores_gemma":[0.9717131,0.01958225,0.001782344,0.0022788264,0.0042888196,0.0003545109],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012056039,0.0011917634,0.0010626353,0.0050853076,0.00088022667,0.0032912209,0.0024907994,0.0015242789,0.0021284088],"category_scores_gemma":[0.051988885,0.0010096321,0.0015745334,0.00516542,0.0007307025,0.0024843626,0.002360605,0.0022538998,0.0007329227],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051540486,0.0011761416,0.10252706,0.0009897532,0.00072436035,0.0005377886,0.0029372037,0.42816597,0.0068690605,0.057563912,0.009613333,0.3883801],"study_design_scores_gemma":[0.000053633743,0.00010856314,0.009158936,0.000101617865,0.000053352807,0.00009801018,0.0006387273,0.9478805,0.0027193693,0.033040635,0.006067487,0.00007921226],"about_ca_topic_score_codex":0.010529852,"about_ca_topic_score_gemma":0.015822312,"teacher_disagreement_score":0.012056039,"about_ca_system_score_codex":0.0025006023,"about_ca_system_score_gemma":0.0025468718,"threshold_uncertainty_score":0.06375921},"labels":[],"label_agreement":null},{"id":"W2756351312","doi":"","title":"Appraisal of Information Technology Requirements in Quantity Surveying Firms in Northern Nigeria","year":2017,"lang":"en","type":"article","venue":"DOAJ (DOAJ: Directory of Open Access Journals)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Position (finance); Business; Order (exchange); Information technology; Marketing; Information and Communications Technology; Emerging technologies; Index (typography); Industrial organization; Operations management; Computer science; Engineering; Finance","score_opus":0.4315790464336935,"score_gpt":0.6129646277082197,"score_spread":0.1813855812745262,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2756351312","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9945521,0.00018312244,0.00038684445,0.00055619574,0.0000043073787,0.00007663323,0.000069122245,0.000006307733,0.004165448],"genre_scores_gemma":[0.99840075,0.00026187734,0.0003943198,0.000051991923,0.0000047141925,0.000022565433,0.000061824656,0.000002162932,0.00079967774],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99122286,0.0019398612,0.0011015823,0.00034177912,0.0044602896,0.0009336293],"domain_scores_gemma":[0.9493781,0.018442253,0.017137554,0.0012845186,0.00974149,0.0040159947],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044663544,0.00017356715,0.00023672146,0.0029481272,0.0015437771,0.0032877878,0.00055035035,0.0005738928,0.0025164078],"category_scores_gemma":[0.023206618,0.0003393099,0.00015302011,0.0037224123,0.0009597766,0.0016697262,0.00127114,0.00048481926,0.00028597756],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001770411,0.00027794496,0.87955546,0.00091660157,0.000019076871,0.003929052,0.037775066,0.0011233495,0.007649087,0.0033276528,0.0016879556,0.063561685],"study_design_scores_gemma":[0.0000036109732,0.00023417524,0.92821014,0.00018839547,0.000008681188,0.0006542102,0.060763877,0.0014576516,0.0010424065,0.0004493567,0.006961847,0.000025547302],"about_ca_topic_score_codex":0.010629209,"about_ca_topic_score_gemma":0.013961815,"teacher_disagreement_score":0.010629209,"about_ca_system_score_codex":0.003747526,"about_ca_system_score_gemma":0.0037206248,"threshold_uncertainty_score":0.027190328},"labels":[],"label_agreement":null},{"id":"W2757414003","doi":"10.13140/rg.2.2.15435.49447","title":"PROJECT MANAGEMENT AND PRACTITIONERS IN THE HEALTH SECTOR: FROM THE QUEBEC HEALTHCARE SYSTEM PERSPECTIVE TO PM LITERATURE REVIEW","year":2017,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec en Outaouais","funders":"","keywords":"Perspective (graphical); Health care; Business; Healthcare system; Public relations; Political science; Economic growth; Economics; Computer science","score_opus":0.05781114931391582,"score_gpt":0.3510629129680194,"score_spread":0.29325176365410355,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2757414003","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0053880634,0.964259,0.00032526176,0.021514038,0.00049786194,0.000096937605,0.00014848613,0.000011391228,0.007759022],"genre_scores_gemma":[0.07661819,0.913156,0.001168256,0.006272414,0.00045525047,0.00020599723,0.00014819196,0.000008259291,0.0019675028],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9899372,0.004625562,0.00083712983,0.00045956444,0.0033388017,0.0008016215],"domain_scores_gemma":[0.9667753,0.018402647,0.0025866001,0.0003006389,0.0105556995,0.001378963],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009688934,0.0005873854,0.0011382711,0.015613587,0.004541923,0.008719895,0.0018817845,0.0027608909,0.0034238428],"category_scores_gemma":[0.02191866,0.00048818116,0.0006690124,0.032725614,0.00380446,0.00432869,0.0017961893,0.0016093916,0.00027792444],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012529928,0.00017449068,0.012486427,0.10313416,0.0003977797,0.0024327466,0.054855585,0.0009873237,0.00061454996,0.04927045,0.13072391,0.6447973],"study_design_scores_gemma":[0.00003147972,0.00013125874,0.059907574,0.16166618,0.00036124478,0.0014415444,0.059207868,0.000515434,0.0002457077,0.003878954,0.71250314,0.000109583896],"about_ca_topic_score_codex":0.7144496,"about_ca_topic_score_gemma":0.7978927,"teacher_disagreement_score":0.9483635,"about_ca_system_score_codex":0.05163649,"about_ca_system_score_gemma":0.13281713,"threshold_uncertainty_score":0.57446414},"labels":[],"label_agreement":null},{"id":"W2760534475","doi":"10.5539/jsd.v10n5p234","title":"Cost and Time Overruns in Building Projects Procured Using Traditional Contracts in Nigeria","year":2017,"lang":"en","type":"article","venue":"Journal of Sustainable Development","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Procurement; Schedule; Cost overrun; Business; Cost estimate; Finance; Operations management; Engineering; Marketing; Economics; Construction industry; Construction engineering; Management","score_opus":0.13064126478972687,"score_gpt":0.361723172176406,"score_spread":0.2310819073866791,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2760534475","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99949193,0.00005908981,0.000051360403,0.000016763377,0.0000011492554,0.000004337467,0.000011934961,4.1897908e-7,0.00036288734],"genre_scores_gemma":[0.99949276,0.00013459729,0.00014812622,0.000004093076,0.0000014855273,0.0000043587024,0.000015796919,7.492973e-7,0.00019801922],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9978538,0.0006956677,0.00028223314,0.00013789078,0.000728392,0.00030199054],"domain_scores_gemma":[0.99389654,0.0012763873,0.0035938197,0.00019624966,0.00066937215,0.00036764296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016197083,0.00017690835,0.00013511923,0.0012386021,0.00054581196,0.0007504656,0.00028633408,0.00024761856,0.00078306184],"category_scores_gemma":[0.005267639,0.00019665215,0.00011564388,0.0018763106,0.0005619764,0.0007006053,0.0008057983,0.00027943356,0.000081380764],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022332503,0.0001824806,0.9463739,0.00012532453,0.000019732013,0.0011747333,0.0047515873,0.001578924,0.002365843,0.00090688135,0.0002144552,0.04208286],"study_design_scores_gemma":[0.000002675861,0.00022588822,0.9847053,0.000052044346,0.000008035468,0.00043260015,0.011846148,0.0007807382,0.00057230255,0.00014622656,0.001216184,0.000011740981],"about_ca_topic_score_codex":0.0076432223,"about_ca_topic_score_gemma":0.020023128,"teacher_disagreement_score":0.0076432223,"about_ca_system_score_codex":0.0013429819,"about_ca_system_score_gemma":0.0011781534,"threshold_uncertainty_score":0.015197456},"labels":[],"label_agreement":null},{"id":"W2764396533","doi":"10.1108/hrmid-05-2016-0073","title":"Using bonus and awards for motivating project employees","year":2016,"lang":"en","type":"article","venue":"Human Resource Management International Digest","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"MacEwan University","funders":"","keywords":"Originality; Milestone; Compensation (psychology); Value (mathematics); Business; Human resource management; Relevance (law); Job security; Marketing; Certificate; Performance management; Job enrichment; Public relations; Job satisfaction; Work (physics); Management; Job performance; Economics; Psychology; Job design; Political science; Computer science; Engineering; Social psychology","score_opus":0.22969100719862443,"score_gpt":0.43531972991387685,"score_spread":0.20562872271525243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2764396533","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5434171,0.0049545965,0.14783399,0.031107686,0.0025025601,0.002251919,0.00010363676,0.0011321976,0.26669636],"genre_scores_gemma":[0.93524885,0.0012148735,0.0521018,0.0013757587,0.00020872925,0.00072146254,0.00003107028,0.000078832025,0.009018575],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.95778036,0.03353785,0.00119064,0.00085384096,0.0047461693,0.0018911926],"domain_scores_gemma":[0.9617433,0.020047573,0.0060880776,0.0023929658,0.004503994,0.005224092],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.027242666,0.00070749497,0.00033062015,0.002137896,0.0044857794,0.0060962765,0.00141482,0.0013995736,0.004335197],"category_scores_gemma":[0.057014637,0.00031957417,0.0003738514,0.0009884805,0.0047703367,0.0030620452,0.0054085595,0.0018344573,0.0011064939],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003022946,0.0010741253,0.04059943,0.0018027868,0.00005991649,0.0008166205,0.060799357,0.0015647841,0.0034581337,0.11781461,0.017238108,0.75446993],"study_design_scores_gemma":[0.0001797725,0.0037908778,0.09564764,0.0068434956,0.00013503945,0.00448838,0.15676242,0.009670388,0.007922314,0.0957067,0.61826813,0.0005847102],"about_ca_topic_score_codex":0.00066417124,"about_ca_topic_score_gemma":0.001579673,"teacher_disagreement_score":0.027242666,"about_ca_system_score_codex":0.0024141576,"about_ca_system_score_gemma":0.00602982,"threshold_uncertainty_score":0.14407468},"labels":[],"label_agreement":null},{"id":"W2765318354","doi":"10.5539/jms.v7n4p76","title":"Project Quality Management Performance: An Insight to Sustainable Development Initiatives in Oil and Gas Host Communities","year":2017,"lang":"en","type":"article","venue":"Journal of Management and Sustainability","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Vendor; Quality (philosophy); Project management; Project management triangle; Context (archaeology); Process management; Project stakeholder; Quality management; Project charter; Marketing; Economics; Management","score_opus":0.08186147177850189,"score_gpt":0.3891480716742861,"score_spread":0.3072865998957842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2765318354","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9756139,0.00017768338,0.0015680258,0.0024169963,0.000009415025,0.0000600708,0.000020573387,0.000012789873,0.020120624],"genre_scores_gemma":[0.99818903,0.000118575845,0.00053283543,0.000047317862,0.0000027416822,0.000012820244,0.000010345954,0.0000039369233,0.0010824006],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.99438655,0.0032633012,0.00015431968,0.0002492638,0.0012262525,0.00072022603],"domain_scores_gemma":[0.9943446,0.0016601386,0.0013495513,0.00017388159,0.0013718975,0.0010999586],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004987657,0.00016952984,0.00019230047,0.0021480005,0.0045892172,0.0048274714,0.00089937664,0.0007744425,0.0018312678],"category_scores_gemma":[0.008679985,0.00017870033,0.00017321417,0.0025457044,0.0034904412,0.0030526272,0.00593344,0.00096396793,0.00012355353],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000066700704,0.00076118205,0.22922887,0.00037420055,0.00002990343,0.0016154092,0.5791401,0.0012963305,0.002139892,0.038128667,0.0032358,0.14398287],"study_design_scores_gemma":[0.0000049910145,0.00021623679,0.10320434,0.00020640211,0.000010341948,0.00035122404,0.8650526,0.0017156607,0.0004175221,0.0047506494,0.02403983,0.000030265468],"about_ca_topic_score_codex":0.014018989,"about_ca_topic_score_gemma":0.026529565,"teacher_disagreement_score":0.014018989,"about_ca_system_score_codex":0.0043235365,"about_ca_system_score_gemma":0.0061927843,"threshold_uncertainty_score":0.031369627},"labels":[],"label_agreement":null},{"id":"W2765322868","doi":"10.1061/9780784481219.016","title":"Delivering Safe, Cost-Effective, Sustainable Civil Infrastructure Projects under Conditions of Non-Stationarity","year":2017,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Merck Canada Inc. (Canada)","funders":"","keywords":"Critical infrastructure; Adaptability; Risk analysis (engineering); Resilience (materials science); Computer science; Engineering; Construction engineering; Systems engineering; Business; Computer security","score_opus":0.05428566792055752,"score_gpt":0.3864921665138465,"score_spread":0.332206498593289,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2765322868","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030178538,0.00007935457,0.95930094,0.000744441,0.000019088264,0.00041681374,0.00005027486,0.00026913852,0.008941373],"genre_scores_gemma":[0.39954346,0.0003603298,0.5961537,0.00006513213,0.000021816197,0.0005341313,0.00012499126,0.000081612074,0.0031147792],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9901134,0.00421058,0.0006106456,0.0007188353,0.003698294,0.0006481952],"domain_scores_gemma":[0.9921936,0.0035556776,0.0019306146,0.0007886663,0.0011638284,0.0003675372],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0075144027,0.00086380326,0.00046649107,0.0016246785,0.0015049651,0.0033191184,0.0015757506,0.0011020862,0.0019451446],"category_scores_gemma":[0.012899606,0.00064952613,0.0007464649,0.0009108992,0.0015903694,0.0026992871,0.0022184027,0.0011081182,0.0006385125],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000085650565,0.00036237776,0.0073686447,0.0004316409,0.00009068823,0.00055794267,0.0018208027,0.56982285,0.009930501,0.16658555,0.0029097123,0.2400337],"study_design_scores_gemma":[0.000116618045,0.0020184421,0.0064256717,0.000367739,0.000113396105,0.0009766549,0.0054302323,0.7310827,0.020560978,0.18394105,0.04877762,0.00018889018],"about_ca_topic_score_codex":0.0025024798,"about_ca_topic_score_gemma":0.0053670215,"teacher_disagreement_score":0.0075144027,"about_ca_system_score_codex":0.0021719497,"about_ca_system_score_gemma":0.0065457392,"threshold_uncertainty_score":0.039740443},"labels":[],"label_agreement":null},{"id":"W2765440346","doi":"10.28945/2163","title":"Factors of Project Manager Success","year":2015,"lang":"en","type":"article","venue":"Informing Science and IT Education Conference","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"International Civil Aviation Organization; Concordia University","funders":"","keywords":"Critical success factor; Context (archaeology); Knowledge management; Project management; Exploratory research; Success factors; Exploratory factor analysis; Project manager; Psychology; Computer science; Management; Business; Sociology; Structural equation modeling; Social science; Business administration","score_opus":0.3305536797046526,"score_gpt":0.4554998276880954,"score_spread":0.12494614798344278,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2765440346","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9810363,0.00027972742,0.0028134685,0.00054217264,0.00002090819,0.00007947756,0.00010434265,0.000041540316,0.015081949],"genre_scores_gemma":[0.99879175,0.00006564537,0.0005068056,0.000014330467,0.0000085443835,0.000024351131,0.000040295832,0.0000046044106,0.00054370874],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.993453,0.0024866208,0.00053676235,0.00036674456,0.0022699877,0.0008868983],"domain_scores_gemma":[0.94846064,0.02655702,0.010501785,0.0015399754,0.005763159,0.0071774926],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0058799624,0.00035952544,0.00025174016,0.0020422896,0.0010701424,0.0027715322,0.00039390777,0.00034562746,0.004929076],"category_scores_gemma":[0.033927426,0.0001861118,0.0002454736,0.0014236275,0.0009120313,0.0012907941,0.0016190645,0.00067462656,0.0006415044],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001617649,0.00033447528,0.9136486,0.00023205522,0.0000966099,0.00036103738,0.011306013,0.0005807035,0.0012743431,0.0036245177,0.0018515722,0.06652836],"study_design_scores_gemma":[0.000015703268,0.0005739387,0.9642566,0.00014914398,0.000038208993,0.0005647546,0.021222495,0.0011557026,0.000625327,0.0017281555,0.00962812,0.000041990956],"about_ca_topic_score_codex":0.0012671093,"about_ca_topic_score_gemma":0.0013126914,"teacher_disagreement_score":0.0058799624,"about_ca_system_score_codex":0.00073273544,"about_ca_system_score_gemma":0.0019055442,"threshold_uncertainty_score":0.031096637},"labels":[],"label_agreement":null},{"id":"W2765486833","doi":"10.1007/978-3-319-66685-3_16","title":"Suspension and Termination of Construction","year":2017,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"IBI Group (Canada)","funders":"","keywords":"Force majeure; Suspension (topology); Work (physics); Event (particle physics); Business; Law; Engineering; Political science; Mechanical engineering; Physics","score_opus":0.10674928169773147,"score_gpt":0.3605244614512543,"score_spread":0.2537751797535228,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2765486833","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014751642,0.0016806334,0.06239421,0.0017371082,0.00042435987,0.00004030601,0.00006168293,0.0000770251,0.9188331],"genre_scores_gemma":[0.5230927,0.0023809497,0.012816195,0.0006765962,0.0006729734,0.00028844684,0.00031614827,0.00039324202,0.45936278],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9978077,0.00059370435,0.00011518961,0.00036819672,0.0006897088,0.00042561322],"domain_scores_gemma":[0.99861014,0.0005785199,0.00010324535,0.00028856768,0.00027626829,0.00014325888],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019878915,0.00065491255,0.00068454474,0.0010565877,0.0025273196,0.004817373,0.0017403192,0.0023029516,0.015556582],"category_scores_gemma":[0.0056672445,0.00051837164,0.0009812055,0.0008676932,0.0102060195,0.004944055,0.00429568,0.0053420295,0.0032606777],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009079877,0.000005077811,0.000041465093,0.000010770177,0.0000011489929,0.00001866246,0.00027434435,0.0002972101,0.00008812097,0.99302036,0.0015460646,0.0046876324],"study_design_scores_gemma":[0.000005059723,0.000012095215,0.00010293186,0.00003721899,0.0000022662348,0.00004216885,0.0001804317,0.0011714799,0.00019096481,0.9575285,0.040720925,0.0000059946447],"about_ca_topic_score_codex":0.0029419328,"about_ca_topic_score_gemma":0.0021798115,"teacher_disagreement_score":0.015556582,"about_ca_system_score_codex":0.0031237912,"about_ca_system_score_gemma":0.0021161838,"threshold_uncertainty_score":0.052041948},"labels":[],"label_agreement":null},{"id":"W2766223241","doi":"10.5465/ambpp.2017.11150abstract","title":"Employee creativity: antecedents and outcomes","year":2017,"lang":"en","type":"article","venue":"Academy of Management Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Creativity; Psychology; Empirical research; Knowledge management; Value (mathematics); Sample (material); Organizational culture; Conceptual framework; Public relations; Social psychology; Sociology; Political science; Computer science; Social science","score_opus":0.12010987931208739,"score_gpt":0.4130304778017189,"score_spread":0.29292059848963153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2766223241","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99653625,0.00018404053,0.00015526837,0.00024081022,0.000012522288,0.000043074917,0.00013663499,0.0000083418,0.0026830987],"genre_scores_gemma":[0.9994307,0.00005942089,0.00012228916,0.000024094292,0.000010293297,0.000024919322,0.00007177815,0.000002961788,0.00025358872],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99732226,0.0008024472,0.00025318286,0.00033824958,0.0007455957,0.00053831126],"domain_scores_gemma":[0.9707399,0.01497796,0.006472407,0.0011526945,0.001802558,0.0048544463],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005243043,0.00032617757,0.00038194002,0.0023182847,0.0013222377,0.0032715034,0.0006200685,0.0014646294,0.006091225],"category_scores_gemma":[0.022804262,0.00032073984,0.0011079684,0.0018131651,0.0013141657,0.0011687847,0.0017436816,0.0021330125,0.00058460503],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021375768,0.000953496,0.98849386,0.00003903512,0.000076033546,0.00018872434,0.00066982623,0.0002403787,0.000121562916,0.0004296397,0.00014696171,0.008426808],"study_design_scores_gemma":[0.0000290137,0.00037374842,0.9945363,0.000063065534,0.00008526641,0.00024971843,0.0019945772,0.0006820815,0.00027362906,0.0014071274,0.00028754017,0.000017905517],"about_ca_topic_score_codex":0.0025842316,"about_ca_topic_score_gemma":0.002469277,"teacher_disagreement_score":0.006091225,"about_ca_system_score_codex":0.00096832187,"about_ca_system_score_gemma":0.002251586,"threshold_uncertainty_score":0.0277282},"labels":[],"label_agreement":null},{"id":"W2766652362","doi":"10.19255/jmpm01409","title":"Compromise between creative activities and project management activities: a contingency factor","year":2017,"lang":"en","type":"article","venue":"Journal of Modern Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec en Outaouais","funders":"","keywords":"Compromise; Contingency; Project management; Contingency theory; Process management; Marketing; Knowledge management; Business; Public relations; Computer science; Management; Sociology; Economics; Political science","score_opus":0.13853701212417083,"score_gpt":0.4022416347787319,"score_spread":0.26370462265456107,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2766652362","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9558843,0.00030063186,0.016309367,0.0009092268,0.000028344783,0.00016688285,0.000029491905,0.0000399314,0.026331808],"genre_scores_gemma":[0.99787986,0.00003452308,0.0017679138,0.000019139072,0.000005080358,0.000024366052,0.0000071208237,0.0000035317328,0.00025839524],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9857231,0.0059641814,0.0010729267,0.001098312,0.004684169,0.0014572799],"domain_scores_gemma":[0.9648976,0.022322481,0.0059621097,0.0014922228,0.0031149483,0.0022107014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007249924,0.00035857625,0.00035455328,0.0025430627,0.0036856635,0.0064773667,0.0007768913,0.00089326856,0.0029710114],"category_scores_gemma":[0.02436264,0.00049177883,0.00031365533,0.0025240076,0.0046665734,0.0040476467,0.003868667,0.0015255851,0.00019281307],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009525141,0.0006272876,0.53416103,0.0006596658,0.0002644206,0.0034167815,0.13558833,0.003751327,0.015529841,0.12179822,0.0012805895,0.18197002],"study_design_scores_gemma":[0.00008018946,0.0009594654,0.5800257,0.00051767123,0.00019101375,0.0044176397,0.2959969,0.011175243,0.005048301,0.07184283,0.029461151,0.00028391439],"about_ca_topic_score_codex":0.0013985231,"about_ca_topic_score_gemma":0.0018189402,"teacher_disagreement_score":0.007249924,"about_ca_system_score_codex":0.003640602,"about_ca_system_score_gemma":0.0034269206,"threshold_uncertainty_score":0.0383417},"labels":[],"label_agreement":null},{"id":"W2766816097","doi":"10.1007/978-3-319-66685-3_3","title":"Forms of Construction Organizations","year":2017,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"IBI Group (Canada)","funders":"","keywords":"Business; Process management; Construction industry; Knowledge management; Engineering management; Engineering; Construction engineering; Computer science","score_opus":0.0782694902070489,"score_gpt":0.3436336670906625,"score_spread":0.2653641768836136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2766816097","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00575467,0.0017837008,0.010741879,0.0032720116,0.00017541698,0.00005246299,0.000056263532,0.000031405456,0.9781321],"genre_scores_gemma":[0.5069313,0.004991772,0.016032955,0.0010874672,0.0004332183,0.0005215398,0.00030429277,0.00014663406,0.46955082],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99798477,0.0009837503,0.00005935309,0.0002589276,0.00049534265,0.00021782712],"domain_scores_gemma":[0.99935216,0.00014063879,0.0000705931,0.0001862653,0.0001299972,0.00012026296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011495743,0.00056151033,0.0002249277,0.0015369231,0.0031379042,0.00977309,0.0010721157,0.0017037472,0.021095345],"category_scores_gemma":[0.0026126713,0.00035872468,0.00022069871,0.002333973,0.016377956,0.0076216897,0.004078754,0.0022185706,0.0036431313],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[8.320336e-7,0.0000019232746,0.000025278905,0.000004268615,2.0464492e-7,0.000004570585,0.0005612747,0.00002855812,0.000010955911,0.99464005,0.0019116052,0.0028104382],"study_design_scores_gemma":[0.0000026743394,0.0000045546917,0.0001402329,0.000052018175,6.841547e-7,0.000052739073,0.0018433506,0.00017009354,0.000032311233,0.80924875,0.18844956,0.0000029605117],"about_ca_topic_score_codex":0.0024933596,"about_ca_topic_score_gemma":0.004512619,"teacher_disagreement_score":0.021095345,"about_ca_system_score_codex":0.0042201104,"about_ca_system_score_gemma":0.0026747838,"threshold_uncertainty_score":0.070570946},"labels":[],"label_agreement":null},{"id":"W2767272346","doi":"10.4018/ijitpm.2018010101","title":"Investigating Critical Factors for Project Success and the Impact of Certification/Training","year":2017,"lang":"en","type":"article","venue":"International Journal of Information Technology Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; International Civil Aviation Organization","funders":"","keywords":"Certification; Critical success factor; Context (archaeology); Training (meteorology); Project management; Knowledge management; Engineering; Business; Marketing; Public relations; Political science; Management; Computer science; Geography; Economics","score_opus":0.13187101035366325,"score_gpt":0.4506801038232838,"score_spread":0.3188090934696205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2767272346","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98897433,0.00018859869,0.0016914433,0.00043304003,0.000009993372,0.000098135555,0.000041133735,0.00001174163,0.008551487],"genre_scores_gemma":[0.9993309,0.00006825419,0.00042080015,0.000011817173,0.000003940525,0.000030810785,0.000018503802,0.0000021388737,0.000112870264],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98891616,0.005512252,0.00072975724,0.0004279712,0.003021355,0.0013924933],"domain_scores_gemma":[0.83311963,0.10940717,0.027778624,0.002314447,0.015875341,0.011504798],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011817086,0.00040605562,0.00027554302,0.0037226244,0.0014104714,0.0023572787,0.0004193596,0.0004157018,0.002862462],"category_scores_gemma":[0.083928525,0.0002509149,0.00036590573,0.0018335092,0.0021807037,0.0016906278,0.0016382103,0.0010219831,0.00018347222],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022513952,0.00048675953,0.89012456,0.00038162753,0.00009466816,0.00023087168,0.016283434,0.001104528,0.0008259219,0.004035879,0.0008526589,0.08535395],"study_design_scores_gemma":[0.000012262998,0.00066519453,0.95701873,0.00026656606,0.00004228921,0.000166216,0.034505874,0.0015404058,0.00082057563,0.0015453387,0.0033744478,0.00004212209],"about_ca_topic_score_codex":0.0045783864,"about_ca_topic_score_gemma":0.0044863247,"teacher_disagreement_score":0.011817086,"about_ca_system_score_codex":0.002735006,"about_ca_system_score_gemma":0.0058304337,"threshold_uncertainty_score":0.06249547},"labels":[],"label_agreement":null},{"id":"W2767396185","doi":"10.5539/ibr.v10n12p139","title":"Determining Critical Success Factors that Contribute to the Delay of Water Infrastructure Construction Projects in the Abu Dhabi Emirtae: A Conceptual Framework","year":2017,"lang":"en","type":"article","venue":"International Business Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Critical success factor; Context (archaeology); Conceptual model; Conceptual framework; Process (computing); Project management; Process management; Business; Abu dhabi; Critical infrastructure; Knowledge management; Computer science; Engineering; Sociology; Computer security; Systems engineering","score_opus":0.18680327959484275,"score_gpt":0.47374455799180987,"score_spread":0.28694127839696715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2767396185","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93320626,0.002145762,0.017363984,0.0085918885,0.0000677844,0.0012131298,0.0003246964,0.00004738296,0.037039094],"genre_scores_gemma":[0.9918852,0.00086477865,0.0060536982,0.00008017276,0.0000117082955,0.00023313491,0.0000676812,0.0000045986317,0.00079907285],"study_design_codex":"observational","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99529076,0.0016390932,0.0005209581,0.00040367668,0.0010955952,0.0010498803],"domain_scores_gemma":[0.98498523,0.007531957,0.0036133085,0.0002213819,0.0020083378,0.0016397922],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005714774,0.0009896632,0.0003825214,0.009432021,0.0030991177,0.0077246535,0.001414783,0.001760148,0.0030886745],"category_scores_gemma":[0.013103895,0.0005554752,0.000798254,0.0056566754,0.0057264473,0.0045581837,0.0053369827,0.0019395115,0.00021816758],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001287486,0.0009188537,0.5290403,0.0018793211,0.00019288785,0.0034149424,0.120141566,0.0106160585,0.002089793,0.2271093,0.0031457508,0.101322465],"study_design_scores_gemma":[0.0000537703,0.00074204116,0.3621807,0.002728015,0.00030097365,0.0017456763,0.49355215,0.026011175,0.0017776061,0.06814923,0.04240776,0.0003508706],"about_ca_topic_score_codex":0.01523352,"about_ca_topic_score_gemma":0.014852802,"teacher_disagreement_score":0.01523352,"about_ca_system_score_codex":0.010233783,"about_ca_system_score_gemma":0.020165632,"threshold_uncertainty_score":0.07425171},"labels":[],"label_agreement":null},{"id":"W2768605314","doi":"10.20381/ruor-21195","title":"Project Management Practices in Small Projects: 5 cases in a Canadian Hospital Setting","year":2017,"lang":"en","type":"dissertation","venue":"uO Research (University of Ottawa)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering management; Program management; Medicine; Operations management; Project management; Engineering; Systems engineering","score_opus":0.2423533755759936,"score_gpt":0.4503880480308637,"score_spread":0.2080346724548701,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2768605314","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9927377,0.00040585524,0.0018069899,0.00096204417,0.00002354664,0.00059950864,0.000049551858,0.000019340623,0.0033953856],"genre_scores_gemma":[0.9936371,0.00070273224,0.0032134634,0.0003237225,0.000011334121,0.00029403056,0.000045226363,0.000018136972,0.0017542348],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9742119,0.013787125,0.0010176556,0.0011194809,0.00441038,0.0054534827],"domain_scores_gemma":[0.9734518,0.00989577,0.0036078098,0.0011443552,0.003824007,0.008076252],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012804211,0.0011568806,0.0005873918,0.0022285362,0.02200292,0.0039958158,0.0036321345,0.002873383,0.0015935161],"category_scores_gemma":[0.037654553,0.00097299385,0.0007689009,0.0042516124,0.00723226,0.0018225758,0.008018671,0.0027398432,0.000250868],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022575619,0.0007551144,0.078067474,0.0007230781,0.0000385956,0.0369807,0.8127713,0.0009040321,0.0011935421,0.0043959203,0.003321455,0.06062297],"study_design_scores_gemma":[0.000033554814,0.00057128683,0.059078798,0.00060479564,0.00003054574,0.007667392,0.90457034,0.0017276625,0.0008792728,0.0011188828,0.023595307,0.00012223738],"about_ca_topic_score_codex":0.46813345,"about_ca_topic_score_gemma":0.6755848,"teacher_disagreement_score":0.46813345,"about_ca_system_score_codex":0.040578343,"about_ca_system_score_gemma":0.04230069,"threshold_uncertainty_score":0.93081725},"labels":[],"label_agreement":null},{"id":"W2774734001","doi":"10.55016/ojs/sppp.v10i1.43125","title":"Business Cases for Major Public Infrastructure Projects in Canada","year":2017,"lang":"en","type":"article","venue":"The School of Public Policy Publications","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Critical infrastructure; Public infrastructure; Political science; Computer science; Computer security","score_opus":0.1582341047351414,"score_gpt":0.38819060427667407,"score_spread":0.22995649954153266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2774734001","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19239967,0.6057062,0.0041083954,0.02549662,0.0010530002,0.0021346358,0.008483192,0.00027516083,0.16034321],"genre_scores_gemma":[0.6588804,0.30897266,0.0067972215,0.0045544435,0.00014368806,0.0007708291,0.004545743,0.0001201735,0.015214854],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9848829,0.0031184694,0.0017168806,0.0007813494,0.007999339,0.0015012062],"domain_scores_gemma":[0.9226471,0.032723807,0.010228514,0.0012966541,0.029032279,0.0040716375],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012440435,0.00052545336,0.0005944672,0.009045429,0.0042563207,0.0058595273,0.0019121697,0.0016120502,0.005025411],"category_scores_gemma":[0.04471463,0.0005308077,0.0011842849,0.022547496,0.0023168197,0.0022709938,0.0016876832,0.0014381291,0.0004625251],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00068078464,0.0003266277,0.04833279,0.062461738,0.00063969754,0.0065782913,0.030456552,0.003050761,0.0022892351,0.04639878,0.2106055,0.58817923],"study_design_scores_gemma":[0.000110424495,0.00015930709,0.08228034,0.04074687,0.0009687233,0.0021152135,0.026932629,0.0012692836,0.0013669778,0.0024274562,0.84141004,0.00021287335],"about_ca_topic_score_codex":0.8769191,"about_ca_topic_score_gemma":0.94477916,"teacher_disagreement_score":0.93912536,"about_ca_system_score_codex":0.06087466,"about_ca_system_score_gemma":0.14600402,"threshold_uncertainty_score":0.44167858},"labels":[],"label_agreement":null},{"id":"W2775248913","doi":"","title":"Canadian Construction Association","year":2017,"lang":"en","type":"article","venue":"Biographies | Encyclopedia of Canadian Laws","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Association (psychology); Epistemology; Philosophy","score_opus":0.03607351907699037,"score_gpt":0.2944599148380702,"score_spread":0.25838639576107986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2775248913","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005720831,0.0019474507,0.0004937038,0.0056035067,0.0023895425,0.00006816443,0.00608125,0.00045221456,0.98239213],"genre_scores_gemma":[0.0012298888,0.00068419223,0.0002245682,0.00028614796,0.00007279941,0.000016408188,0.0013080547,0.00007576947,0.9961022],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99748755,0.000075277065,0.000068766436,0.00025462743,0.0017276828,0.0003862065],"domain_scores_gemma":[0.9951591,0.0001483102,0.00008685528,0.00032800384,0.0036671963,0.0006106241],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0009865791,0.0012899628,0.0006998956,0.0040239305,0.007433243,0.005967319,0.0015077185,0.0021665723,0.57705677],"category_scores_gemma":[0.0035680216,0.00091923086,0.00074552506,0.006204884,0.0013550415,0.0013506655,0.0022979085,0.0023652778,0.30632427],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009362058,0.000013837598,0.00026893188,0.000038322807,0.0000020530754,0.000026265609,0.000033689546,0.00006637868,0.0000524518,0.0062663658,0.95478266,0.038439654],"study_design_scores_gemma":[0.0000016424614,0.000001458668,0.00046220102,0.000019090508,0.000001162489,0.000010540065,0.0000363086,0.000035871388,0.000019079935,0.0002704044,0.9991387,0.0000034435695],"about_ca_topic_score_codex":0.7944957,"about_ca_topic_score_gemma":0.91116464,"teacher_disagreement_score":0.57705677,"about_ca_system_score_codex":0.018075889,"about_ca_system_score_gemma":0.07801455,"threshold_uncertainty_score":0.6032772},"labels":[],"label_agreement":null},{"id":"W2775387030","doi":"10.2749/222137817822208744","title":"Structural Engineering Global Interoperability: Codes and Standards","year":2017,"lang":"en","type":"article","venue":"Report","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Interoperability; Unification; Presentation (obstetrics); China; Code (set theory); Political science; Computer science; Engineering; Law; Programming language; World Wide Web","score_opus":0.0784635127671304,"score_gpt":0.4145313447925455,"score_spread":0.3360678320254151,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2775387030","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004226819,0.025280979,0.48820275,0.06899077,0.004919158,0.0005215685,0.0013245139,0.0017407121,0.40479276],"genre_scores_gemma":[0.20301987,0.06934144,0.55188674,0.012394253,0.0052032336,0.0026968252,0.0060644317,0.0023685268,0.14702466],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9766883,0.010392757,0.0022724355,0.001026944,0.008868075,0.00075143],"domain_scores_gemma":[0.98320365,0.006923509,0.0012540866,0.003662651,0.0045315847,0.00042445576],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014228711,0.0013771758,0.0008836174,0.0074221455,0.0019195864,0.009837818,0.0022353344,0.005443605,0.008634238],"category_scores_gemma":[0.031452224,0.0007113456,0.00071869144,0.012857997,0.011126314,0.010678327,0.005028531,0.0058344463,0.004959291],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009081524,0.000019102748,0.0002451339,0.00018617831,0.000006158289,0.00005059136,0.0007887727,0.002042471,0.0002538299,0.90308416,0.02996133,0.06335326],"study_design_scores_gemma":[0.0000050084645,0.00002662281,0.0006163185,0.0009643045,0.000006540816,0.00017260831,0.0010037418,0.0030350366,0.0006087708,0.49386048,0.49966556,0.00003511819],"about_ca_topic_score_codex":0.007949117,"about_ca_topic_score_gemma":0.004881879,"teacher_disagreement_score":0.014228711,"about_ca_system_score_codex":0.005140884,"about_ca_system_score_gemma":0.011063033,"threshold_uncertainty_score":0.07524955},"labels":[],"label_agreement":null},{"id":"W2776348486","doi":"10.1061/(asce)me.1943-5479.0000587","title":"Sustainable Delivery of Megaprojects in Iran: Integrated Model of Contextual Factors","year":2017,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":120,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Megaproject; Sustainability; Triple bottom line; Context (archaeology); Business; Structural equation modeling; Environmental economics; Supply chain; Sustainable development; Process management; Environmental resource management; Economics; Marketing; Computer science; Management; Political science","score_opus":0.08472870886236886,"score_gpt":0.3227454332777561,"score_spread":0.23801672441538727,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2776348486","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8351321,0.0010896376,0.087668486,0.004162426,0.00010747141,0.0006839923,0.0009587723,0.00022966338,0.069967404],"genre_scores_gemma":[0.9870957,0.0006460773,0.009066836,0.000069210895,0.000015902573,0.00023093412,0.00015693916,0.000012551953,0.0027058413],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99898463,0.0004099814,0.00003141232,0.00017009252,0.00016677621,0.00023708564],"domain_scores_gemma":[0.99882513,0.0004717611,0.00026151064,0.000045777884,0.00023612588,0.00015976191],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010944017,0.00081461656,0.00059218454,0.0017841792,0.0009982721,0.0030931644,0.0015660058,0.0011096066,0.0045354017],"category_scores_gemma":[0.002515825,0.00047004997,0.0013043731,0.002201271,0.0011984725,0.002528825,0.002120977,0.0011000485,0.00048321672],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002930749,0.00149153,0.24288037,0.000599369,0.0005047911,0.0020201062,0.010095904,0.41729078,0.0016075935,0.24925625,0.0047793523,0.06918081],"study_design_scores_gemma":[0.00017226285,0.00087981456,0.11927874,0.00043573292,0.0006942726,0.0006953228,0.017984217,0.75252277,0.000684996,0.08494109,0.02153161,0.00017920583],"about_ca_topic_score_codex":0.041792005,"about_ca_topic_score_gemma":0.036366463,"teacher_disagreement_score":0.041792005,"about_ca_system_score_codex":0.0047982717,"about_ca_system_score_gemma":0.006924633,"threshold_uncertainty_score":0.08309752},"labels":[],"label_agreement":null},{"id":"W2777359471","doi":"","title":"LES BUREAUX DE PROJET ET LES STRATÉGIES D'APPRENTISSAGE","year":2010,"lang":"fr","type":"book","venue":"Editions universitaires europeennes eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.06850231640298068,"score_gpt":0.32004566408234003,"score_spread":0.2515433476793594,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2777359471","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22629757,0.0108171785,0.12262739,0.064116225,0.00097472075,0.0013970935,0.0008955637,0.0010252047,0.5718491],"genre_scores_gemma":[0.61506367,0.010158436,0.0969379,0.0025435043,0.00014661498,0.0008726768,0.0007199186,0.00034477597,0.2732125],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9902676,0.002980374,0.00041499303,0.00087109505,0.0036970114,0.0017689802],"domain_scores_gemma":[0.98752624,0.002328994,0.001406714,0.00082289404,0.0038821772,0.0040330044],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010638103,0.0007715913,0.0004184489,0.002362627,0.0070204064,0.01781701,0.0019131984,0.0023668816,0.016766425],"category_scores_gemma":[0.014742127,0.00059855694,0.0005501854,0.0041110264,0.0055222292,0.005194215,0.005742014,0.0036189368,0.0031514526],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013532754,0.00036533593,0.032112043,0.00072100427,0.00006926154,0.0006426961,0.051680785,0.0054756044,0.0030069677,0.42690483,0.036621816,0.4422643],"study_design_scores_gemma":[0.000043930107,0.00028056165,0.047996078,0.0016124167,0.00004208716,0.0003474291,0.048661664,0.0030090688,0.0021044565,0.041192453,0.85460067,0.0001091966],"about_ca_topic_score_codex":0.16948281,"about_ca_topic_score_gemma":0.23458695,"teacher_disagreement_score":0.16948281,"about_ca_system_score_codex":0.024400149,"about_ca_system_score_gemma":0.09703198,"threshold_uncertainty_score":0.33699268},"labels":[],"label_agreement":null},{"id":"W2777455068","doi":"10.5267/j.jpm.2017.12.001","title":"A structural equation modeling approach to examine the relationship between complexity factors of a project and the merits of project manager","year":2017,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Structural equation modeling; Computer science; Process management; Project management; Management science; Engineering; Systems engineering","score_opus":0.5495789333624785,"score_gpt":0.44106866880290424,"score_spread":0.1085102645595743,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2777455068","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.64320916,0.0016347136,0.3234634,0.0050298227,0.00045948965,0.005266965,0.0036419933,0.00046217736,0.016832294],"genre_scores_gemma":[0.8634138,0.0012967191,0.12091163,0.00031528054,0.00010758707,0.008287388,0.0020779395,0.000041746538,0.0035479772],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9916967,0.0058336235,0.0004513439,0.0006753612,0.00085745845,0.00048551348],"domain_scores_gemma":[0.9797846,0.016440593,0.0018677867,0.00031060548,0.0012251224,0.00037133845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008069046,0.0019700017,0.0014367589,0.0074376324,0.0019527291,0.0022128199,0.0022190877,0.0019065775,0.008759694],"category_scores_gemma":[0.01970901,0.0008600516,0.0029654854,0.0068689543,0.0012846196,0.003065503,0.0025892968,0.003518719,0.0007727281],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00086330523,0.006787508,0.61654156,0.0025828907,0.003936938,0.0013703005,0.026621176,0.065106206,0.0027432225,0.13749965,0.008872234,0.12707499],"study_design_scores_gemma":[0.00062426535,0.006607534,0.1724333,0.002083177,0.0026246984,0.00086247013,0.025686298,0.68851995,0.0019331445,0.074595,0.023624111,0.00040606654],"about_ca_topic_score_codex":0.01530611,"about_ca_topic_score_gemma":0.014387109,"teacher_disagreement_score":0.01530611,"about_ca_system_score_codex":0.0041420795,"about_ca_system_score_gemma":0.006328103,"threshold_uncertainty_score":0.042673767},"labels":[],"label_agreement":null},{"id":"W2777689208","doi":"10.1108/bepam-03-2017-0017","title":"Model for developing trust on US construction projects","year":2017,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Originality; Business; Measure (data warehouse); Phone; Value (mathematics); Integrated project delivery; Knowledge management; Process management; Computer science; Project management; Engineering; Systems engineering; Qualitative research","score_opus":0.19274436991268185,"score_gpt":0.3801893441129762,"score_spread":0.18744497420029438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2777689208","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22105049,0.00043687015,0.6597805,0.005289571,0.00013538614,0.0011195913,0.001025925,0.0005398424,0.110621735],"genre_scores_gemma":[0.93513554,0.00026372116,0.058337416,0.00007686889,0.00001699758,0.00075948937,0.0003690601,0.000022871218,0.0050180946],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.99438274,0.0034941516,0.00039118738,0.00051965157,0.0007847171,0.00042752837],"domain_scores_gemma":[0.9876166,0.0067320373,0.0018677459,0.000603721,0.002630688,0.00054914586],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005126627,0.00079731777,0.00044614737,0.002696175,0.0013243449,0.0030334655,0.0010833312,0.0011513222,0.0075564934],"category_scores_gemma":[0.021557672,0.00044999097,0.001322028,0.0022463847,0.0016344135,0.004185025,0.002597688,0.0013431496,0.0008213792],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023217931,0.00035142922,0.046248425,0.00040449292,0.00025813957,0.00089369767,0.008553167,0.19806595,0.000632677,0.6558689,0.0066549745,0.081836],"study_design_scores_gemma":[0.00009910287,0.00043887962,0.013379068,0.0005046312,0.00021443285,0.0005527491,0.006326735,0.73658186,0.0005165183,0.21731137,0.023968482,0.00010628324],"about_ca_topic_score_codex":0.020976283,"about_ca_topic_score_gemma":0.017146701,"teacher_disagreement_score":0.020976283,"about_ca_system_score_codex":0.006862013,"about_ca_system_score_gemma":0.0049725375,"threshold_uncertainty_score":0.04978764},"labels":[],"label_agreement":null},{"id":"W2779477037","doi":"10.1016/j.ijproman.2017.12.003","title":"A model to control environmental performance of project execution process based on greenhouse gas emissions using earned value management","year":2017,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":51,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Ontario Centres of Excellence","keywords":"Greenhouse gas; Work breakdown structure; Earned value management; Project management; Project planning; Environmental economics; Work (physics); Control (management); Schedule; Carbon tax; Project management triangle; Engineering; Environmental resource management; Environmental science; Systems engineering; Computer science; Project charter; Economics","score_opus":0.0987097440407331,"score_gpt":0.40112382531073604,"score_spread":0.3024140812700029,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2779477037","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25242046,0.0003738528,0.7315995,0.0006281717,0.00018033411,0.000113170856,0.0003305232,0.0008597782,0.013494176],"genre_scores_gemma":[0.9866844,0.0000889223,0.008816344,0.000025812793,0.000014074622,0.00006687071,0.00008843163,0.000019922132,0.00419518],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99948823,0.00011931827,0.000023868866,0.00015768921,0.00010604809,0.000104902196],"domain_scores_gemma":[0.9989812,0.0005487546,0.00015741498,0.000038670085,0.00020955331,0.000064350126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008857235,0.0007941883,0.0008030973,0.0006148958,0.00045344842,0.0017448788,0.0014278962,0.0013258139,0.0023907756],"category_scores_gemma":[0.0018436831,0.00033971478,0.000657523,0.0005549015,0.0005547225,0.0012457187,0.00064488174,0.0008104252,0.00021131399],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042992335,0.000042424974,0.00070404954,0.000022991453,0.000020841288,0.000042663993,0.000024129326,0.99199986,0.00059391407,0.0031786854,0.00014477363,0.0031826803],"study_design_scores_gemma":[0.0000047914136,0.00001405586,0.00013626818,0.0000013852831,0.000007652293,0.00000284654,0.0000036499748,0.99892765,0.0001196956,0.00070834736,0.000070597984,0.0000030921976],"about_ca_topic_score_codex":0.015258406,"about_ca_topic_score_gemma":0.007185701,"teacher_disagreement_score":0.015258406,"about_ca_system_score_codex":0.0012519701,"about_ca_system_score_gemma":0.0014195917,"threshold_uncertainty_score":0.030339181},"labels":[],"label_agreement":null},{"id":"W2781546571","doi":"10.1088/1755-1315/109/1/012011","title":"Recruitment criteria and attraction strategies for local trained labour in Malaysia’s construction industry","year":2017,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Universiti Tun Hussein Onn Malaysia","keywords":"Salary; Overtime; Allowance (engineering); Order (exchange); Payment; Work (physics); Quarter (Canadian coin); Business; Accommodation; Labour economics; Value (mathematics); Economic shortage; Welfare; Construction industry; Marketing; Operations management; Economics; Engineering; Finance; Market economy; Government (linguistics)","score_opus":0.1218457203894658,"score_gpt":0.35072071424755424,"score_spread":0.22887499385808846,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2781546571","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97370005,0.00064968783,0.0031859826,0.0015980612,0.00009202344,0.011629986,0.00020230364,0.000040592444,0.008901284],"genre_scores_gemma":[0.9510416,0.0010865212,0.020913435,0.0009151463,0.000050161496,0.014847932,0.0003216632,0.00001957228,0.010803944],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99661165,0.0017515622,0.00033929816,0.00013452799,0.0006027183,0.00056018436],"domain_scores_gemma":[0.99702555,0.00075557653,0.0003849018,0.00007967444,0.00088506564,0.00086926366],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007749958,0.00030801812,0.00033141888,0.0013244074,0.0020607195,0.0013406696,0.0010450965,0.00094879343,0.0069428384],"category_scores_gemma":[0.009520084,0.00022985884,0.00029536374,0.0007449683,0.00037716283,0.0006147783,0.0017848756,0.00055416767,0.001873571],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016545063,0.005355956,0.36849117,0.0040953215,0.00003440066,0.006955304,0.1285145,0.0010188861,0.012677303,0.0026210356,0.01725086,0.45133087],"study_design_scores_gemma":[0.00049720396,0.011588348,0.4716423,0.0042760065,0.00008925562,0.0030923912,0.42497656,0.0060159164,0.008283366,0.0021280993,0.06714733,0.00026331012],"about_ca_topic_score_codex":0.0025434024,"about_ca_topic_score_gemma":0.0061624614,"teacher_disagreement_score":0.007749958,"about_ca_system_score_codex":0.0011786731,"about_ca_system_score_gemma":0.005216554,"threshold_uncertainty_score":0.04098618},"labels":[],"label_agreement":null},{"id":"W2783210159","doi":"10.5539/ibr.v11n2p16","title":"Analysis of Critical Success Factors Influence on Critical Delays for Water Infrastructure Construction Projects in the Abu Dhabi emirate Using PLS-SEM Method","year":2018,"lang":"en","type":"article","venue":"International Business Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Structural equation modeling; Critical success factor; Project management; Moderation; Operations management; Process management; Data collection; Computer science; Knowledge management; Business; Engineering; Mathematics; Statistics; Systems engineering","score_opus":0.24273248680459814,"score_gpt":0.5467224923013458,"score_spread":0.3039900054967477,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2783210159","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9947184,0.000072954346,0.0022327842,0.0001608846,0.0000053601866,0.00012362785,0.00014384418,0.000009170115,0.002533049],"genre_scores_gemma":[0.99582267,0.00015013645,0.0031183073,0.000017926846,0.0000033507301,0.00011975447,0.00010490253,0.0000053698077,0.000657582],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9959408,0.0016137077,0.0002978844,0.00036368155,0.0013273789,0.00045658686],"domain_scores_gemma":[0.9788978,0.013251453,0.0032123232,0.00051312236,0.003526701,0.00059850456],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0056582633,0.00061264366,0.0003417696,0.0025010079,0.0009774603,0.0018122206,0.00037964177,0.0003470072,0.0027903786],"category_scores_gemma":[0.015175731,0.00040130044,0.0005680323,0.0030704117,0.0010001932,0.0011843509,0.001381503,0.0008709589,0.00021381372],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020401017,0.00039075164,0.83538187,0.00064104254,0.00015287758,0.0006919474,0.051841278,0.003745035,0.0042479383,0.0036538255,0.00092418474,0.098125316],"study_design_scores_gemma":[0.000015942882,0.00050074345,0.85677177,0.00034735174,0.000107418455,0.00026700407,0.12092925,0.008378581,0.0039052374,0.001720917,0.0069773085,0.00007847061],"about_ca_topic_score_codex":0.007931632,"about_ca_topic_score_gemma":0.016902579,"teacher_disagreement_score":0.007931632,"about_ca_system_score_codex":0.00271622,"about_ca_system_score_gemma":0.0054539903,"threshold_uncertainty_score":0.029924154},"labels":[],"label_agreement":null},{"id":"W2783792461","doi":"10.5267/j.jpm.2018.1.002","title":"The advantage of project risk management tools","year":2018,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"New York Institute of Technology","funders":"","keywords":"Risk management; Risk analysis (engineering); Business; Computer science","score_opus":0.08492063532599971,"score_gpt":0.4024880177353785,"score_spread":0.3175673824093788,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2783792461","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07142013,0.008258245,0.8242533,0.0055941106,0.00055464887,0.0008726135,0.0009180659,0.0055806558,0.08254831],"genre_scores_gemma":[0.453964,0.0051346463,0.52730334,0.00074730825,0.00066866307,0.00082334504,0.0008023061,0.00047680578,0.0100795785],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.97675055,0.01079648,0.00196038,0.0010009528,0.009056427,0.000435244],"domain_scores_gemma":[0.9222744,0.049306937,0.009721043,0.00936806,0.007874161,0.0014553806],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013549926,0.0015959152,0.00080510596,0.006467876,0.0005362378,0.0042823628,0.0017056293,0.0010746609,0.00722881],"category_scores_gemma":[0.059792347,0.00054727163,0.0010888516,0.0039098677,0.0007617761,0.007217298,0.0036007105,0.0019725873,0.0023929214],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021820984,0.00039876223,0.013427785,0.0018058447,0.00018205775,0.00031232816,0.002363024,0.0034720378,0.0038983652,0.035215832,0.010079202,0.9286266],"study_design_scores_gemma":[0.00044742762,0.0034197199,0.10888696,0.011032753,0.0010803927,0.0122002335,0.0066487193,0.05099444,0.019853132,0.24039103,0.5441104,0.00093484146],"about_ca_topic_score_codex":0.00035715665,"about_ca_topic_score_gemma":0.00036008077,"teacher_disagreement_score":0.013549926,"about_ca_system_score_codex":0.00056136795,"about_ca_system_score_gemma":0.0015667045,"threshold_uncertainty_score":0.071659684},"labels":[],"label_agreement":null},{"id":"W2784641619","doi":"10.1108/ijmpb-08-2017-0095","title":"The governance of major public infrastructure projects: the process of translation","year":2018,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Montréal","funders":"Social Sciences and Humanities Research Council of Canada; Université du Québec à Montréal","keywords":"Corporate governance; Project governance; Originality; Appropriation; Public sector; Performative utterance; Process (computing); Ostensive definition; Process management; Business; Sociology; Public relations; Qualitative research; Political science; Computer science","score_opus":0.05475672375352143,"score_gpt":0.3555030994608251,"score_spread":0.30074637570730367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2784641619","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4784688,0.0029798606,0.33320448,0.03858584,0.001095568,0.0072643813,0.0004612845,0.0004870756,0.13745263],"genre_scores_gemma":[0.91866535,0.0014753034,0.069708444,0.0011081106,0.00008108258,0.0019451962,0.00014783378,0.00022344747,0.0066452376],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9071884,0.07610412,0.0035406,0.002808602,0.00822881,0.002129574],"domain_scores_gemma":[0.7308827,0.20723072,0.008945085,0.02926525,0.021495327,0.002180973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0856438,0.00077511504,0.00063833484,0.002783971,0.00597719,0.009554746,0.002218808,0.0018555906,0.004608373],"category_scores_gemma":[0.16773815,0.00088116445,0.0006967909,0.004432896,0.01989478,0.0062193824,0.010385467,0.004201518,0.00073895865],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006263002,0.00013404171,0.0029043204,0.0008841397,0.000013730385,0.0010696755,0.8019156,0.0009338189,0.0019058764,0.08318459,0.00250984,0.10448171],"study_design_scores_gemma":[0.000040285562,0.00032583496,0.0066904225,0.0038536794,0.000032338547,0.0011812998,0.74055463,0.0038815958,0.0052138045,0.07881128,0.15929821,0.000116586925],"about_ca_topic_score_codex":0.006359215,"about_ca_topic_score_gemma":0.005220579,"teacher_disagreement_score":0.0856438,"about_ca_system_score_codex":0.01114651,"about_ca_system_score_gemma":0.024428874,"threshold_uncertainty_score":0.45293313},"labels":[],"label_agreement":null},{"id":"W2784930664","doi":"10.5539/ies.v11n2p27","title":"A Survey on Chinese Scholars’ Adoption of Mixed Methods","year":2018,"lang":"en","type":"article","venue":"International Education Studies","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Multimethodology; Context (archaeology); China; Structural equation modeling; Adaptability; Qualitative property; Qualitative research; Perception; Psychology; Social science; Sociology; Political science; Geography; Mathematics; Statistics; Management","score_opus":0.2671681532270972,"score_gpt":0.5716430290754031,"score_spread":0.3044748758483059,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2784930664","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":"methods","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":"methods","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9917059,0.00074183755,0.0020887195,0.0006355005,0.000029825856,0.00060204143,0.00032352898,0.000020775944,0.003851843],"genre_scores_gemma":[0.98981094,0.0016362083,0.0052683037,0.00058622286,0.000032717842,0.000809441,0.00038683423,0.000007739079,0.0014616294],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9915999,0.0041936394,0.0015093337,0.00044505222,0.0018644389,0.0003876428],"domain_scores_gemma":[0.9698612,0.014669325,0.0040681376,0.0016397433,0.008502691,0.0012589194],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.018169198,0.00034150595,0.00045211904,0.00311542,0.0013962913,0.00092161406,0.00062294374,0.0005487951,0.0017592877],"category_scores_gemma":[0.024110746,0.00040296244,0.0005029843,0.003984444,0.000742963,0.0014238905,0.0012237633,0.00055301894,0.00025833183],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001809133,0.00042042427,0.71833044,0.001730265,0.00011882476,0.0005791156,0.09584769,0.00033194182,0.005627646,0.0014117621,0.0025857217,0.17283525],"study_design_scores_gemma":[0.00004511852,0.0015927199,0.87363595,0.00067127513,0.00014915169,0.0006796324,0.09286635,0.0017093226,0.002984303,0.0005045463,0.02505184,0.00010992325],"about_ca_topic_score_codex":0.0044938894,"about_ca_topic_score_gemma":0.0047838525,"teacher_disagreement_score":0.9818308,"about_ca_system_score_codex":0.0018592292,"about_ca_system_score_gemma":0.0034797268,"threshold_uncertainty_score":0.096089005},"labels":[],"label_agreement":null},{"id":"W2788198690","doi":"10.5539/jpl.v11n1p88","title":"Regulatory Impact Assessment Role in Developing Participatory Work between Civil Society Organizations and Jordanian Ministry of Political and Parliamentary Affairs","year":2018,"lang":"en","type":"article","venue":"Journal of Politics and Law","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Civil society; Public administration; Politics; Work (physics); Legislation; Enforcement; Citizen journalism; Political science; Christian ministry; Law; Engineering","score_opus":0.05789053086666865,"score_gpt":0.3815255273059523,"score_spread":0.3236349964392836,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2788198690","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20370649,0.0009921492,0.11859873,0.036122557,0.00044399934,0.0040749363,0.00010848438,0.00039575133,0.6355569],"genre_scores_gemma":[0.93311805,0.00032086254,0.035123065,0.0018555025,0.000084722094,0.0010450749,0.00004722997,0.00004506088,0.02836052],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9300227,0.053910304,0.001882177,0.0029784527,0.007374871,0.0038314438],"domain_scores_gemma":[0.9475874,0.02642313,0.0049715806,0.0032351743,0.012366407,0.005416425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.06618645,0.0004895593,0.00033154213,0.0029467987,0.010172,0.011479939,0.0017749007,0.0022874898,0.012378659],"category_scores_gemma":[0.043592665,0.0004609274,0.0005039246,0.0017794212,0.007459758,0.005510837,0.009039771,0.0030633237,0.0013199622],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001849564,0.0012547361,0.040511817,0.0007257504,0.00007029999,0.0011034772,0.12098332,0.0034379966,0.0037381933,0.43205914,0.014862538,0.3810678],"study_design_scores_gemma":[0.0001728736,0.0010400726,0.043436717,0.0016912452,0.00011171995,0.00089025986,0.17206803,0.010124654,0.007873955,0.14420533,0.618189,0.00019609406],"about_ca_topic_score_codex":0.0037924591,"about_ca_topic_score_gemma":0.006665719,"teacher_disagreement_score":0.06618645,"about_ca_system_score_codex":0.0092032505,"about_ca_system_score_gemma":0.042459115,"threshold_uncertainty_score":0.3500316},"labels":[],"label_agreement":null},{"id":"W2790814261","doi":"10.3389/fpsyg.2018.00086","title":"When Project Commitment Leads to Learning from Failure: The Roles of Perceived Shame and Personal Control","year":2018,"lang":"en","type":"article","venue":"Frontiers in Psychology","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Asthma and Allergy Foundation of America","keywords":"Shame; Psychology; Attribution; Empirical research; Fear of failure; Social psychology; Control (management); Affect (linguistics); Process (computing); Cognition; Management","score_opus":0.04960544434496743,"score_gpt":0.3540607550797783,"score_spread":0.30445531073481086,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2790814261","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99534625,0.000220353,0.0007138354,0.0007756492,0.000022019807,0.000017633762,0.000017419383,0.000006189631,0.0028805963],"genre_scores_gemma":[0.99960226,0.000075450254,0.00012237106,0.000042947926,0.0000073632787,0.000009319907,0.000013569723,0.0000024232313,0.00012423733],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9944359,0.002970373,0.00037300374,0.00041113707,0.0010089804,0.00080066564],"domain_scores_gemma":[0.93688565,0.032088988,0.017266696,0.0024749092,0.002702746,0.008580945],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0078046625,0.00033308056,0.00040753523,0.0013972849,0.0013157417,0.00451581,0.0006509809,0.0013276188,0.0038537232],"category_scores_gemma":[0.04319174,0.00035794597,0.00050315715,0.0007193026,0.002538212,0.0021978584,0.0028163025,0.0024120398,0.00027093367],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034262356,0.00075155887,0.9329846,0.00013742733,0.00017146992,0.00084344565,0.026237631,0.00045332708,0.000720515,0.0026159908,0.00047798583,0.03426336],"study_design_scores_gemma":[0.00003726799,0.00041885607,0.9320603,0.0002616464,0.00011639824,0.0007205504,0.05386038,0.0024449325,0.00047921296,0.008371028,0.0011436237,0.000085756474],"about_ca_topic_score_codex":0.0017314812,"about_ca_topic_score_gemma":0.0016789554,"teacher_disagreement_score":0.0078046625,"about_ca_system_score_codex":0.0010602695,"about_ca_system_score_gemma":0.0016354455,"threshold_uncertainty_score":0.0412755},"labels":[],"label_agreement":null},{"id":"W2792924851","doi":"","title":"Employability of local trained skill labour in construction industry","year":2017,"lang":"en","type":"dissertation","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Employability; Salary; Overtime; Payment; Order (exchange); Allowance (engineering); Work (physics); Quarter (Canadian coin); Business; Labour economics; Economic shortage; Construction industry; Welfare; Value (mathematics); Engineering; Operations management; Economics; Economic growth; Finance; Market economy; Computer science; Government (linguistics)","score_opus":0.06619743533824962,"score_gpt":0.4068508133987674,"score_spread":0.34065337806051776,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2792924851","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99820733,0.00009212153,0.000027813081,0.000043724624,0.0000021943126,0.0000045256406,0.000034940458,9.819247e-7,0.0015864035],"genre_scores_gemma":[0.99853563,0.000120286,0.000029144463,0.00001138041,0.0000017081256,0.0000044140083,0.0000377043,0.0000010035894,0.0012586837],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99936754,0.00014144869,0.000046570734,0.000049673385,0.0002038231,0.00019093325],"domain_scores_gemma":[0.99865144,0.0002186201,0.00052791357,0.000056508936,0.0001719317,0.00037364895],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00070439023,0.00013580914,0.0001200902,0.00091223774,0.0007138583,0.0008715974,0.00041704573,0.00026886066,0.0048473207],"category_scores_gemma":[0.0018474567,0.00010906465,0.00016088848,0.0011008731,0.00048982515,0.0004363448,0.0009115027,0.00030148486,0.0006182825],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004385861,0.00009942522,0.9671915,0.00009019428,0.000009337378,0.0005223832,0.012927025,0.00011989231,0.0007680898,0.00020430364,0.00034165103,0.017682297],"study_design_scores_gemma":[0.0000011154655,0.000107896776,0.9742933,0.00005373363,0.000003025428,0.00016685198,0.02381719,0.00010820261,0.000096554824,0.000037782647,0.0013078989,0.0000064022784],"about_ca_topic_score_codex":0.013154223,"about_ca_topic_score_gemma":0.032068267,"teacher_disagreement_score":0.013154223,"about_ca_system_score_codex":0.00067354186,"about_ca_system_score_gemma":0.0008699939,"threshold_uncertainty_score":0.026155293},"labels":[],"label_agreement":null},{"id":"W2798218468","doi":"10.5267/j.msl.2018.4.017","title":"Critical success factors in implementing knowledge management in consultant firms for Malaysian construction industry","year":2018,"lang":"en","type":"article","venue":"Management Science Letters","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universiti Teknologi Malaysia","keywords":"Ranking (information retrieval); Critical success factor; Business; Plan (archaeology); Knowledge management; Questionnaire; Descriptive statistics; Argument (complex analysis); Marketing; Operations management; Computer science; Engineering; Sociology","score_opus":0.06736217156052132,"score_gpt":0.4034907950091387,"score_spread":0.3361286234486174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2798218468","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99609274,0.00010716129,0.00016390337,0.00031380335,0.0000036139318,0.000030613955,0.000010616143,0.000005078514,0.0032724813],"genre_scores_gemma":[0.9993579,0.000069036636,0.00023370191,0.000020541178,0.0000016856338,0.0000076127717,0.000009830719,0.000001366739,0.0002984518],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9922531,0.0025552544,0.00052179984,0.00029547923,0.0023789103,0.001995378],"domain_scores_gemma":[0.94550806,0.020904073,0.012825337,0.00073725823,0.009826679,0.010198596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0059244186,0.00018971867,0.00017771278,0.0016121046,0.0017492407,0.0032940907,0.0004708451,0.0005788816,0.0017667422],"category_scores_gemma":[0.03279875,0.00024700738,0.0001794051,0.0013838678,0.00081829727,0.0009972051,0.0012979363,0.000716515,0.00026314825],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028235407,0.0005493278,0.8797352,0.00032836778,0.000048078047,0.0015645842,0.024456814,0.0011026728,0.002658321,0.0019214492,0.0013405335,0.08601241],"study_design_scores_gemma":[0.000011667977,0.0004887944,0.9280801,0.00019656448,0.000028275861,0.00048519744,0.06275423,0.0014755551,0.0014908435,0.0003401211,0.0046036295,0.000044986566],"about_ca_topic_score_codex":0.012912339,"about_ca_topic_score_gemma":0.020213613,"teacher_disagreement_score":0.012912339,"about_ca_system_score_codex":0.0041946783,"about_ca_system_score_gemma":0.009826199,"threshold_uncertainty_score":0.031331718},"labels":[],"label_agreement":null},{"id":"W2798961583","doi":"10.4324/9780080492575","title":"Construction Business Management","year":2007,"lang":"en","type":"book","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Computer science; Process management","score_opus":0.08054552598147717,"score_gpt":0.3527336606404664,"score_spread":0.2721881346589892,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2798961583","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004189024,0.014212106,0.0011456361,0.025387269,0.0039444636,0.00017273554,0.00069023453,0.0007728937,0.94948554],"genre_scores_gemma":[0.015352702,0.008869605,0.0008929512,0.0057903705,0.0007215671,0.000112052985,0.00090343266,0.00017042492,0.967187],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99593335,0.00050315226,0.00016511758,0.00032035937,0.0025014784,0.0005764912],"domain_scores_gemma":[0.99678147,0.00029288538,0.00024648724,0.00030332332,0.0010091555,0.0013667063],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014746161,0.0004974007,0.00048000176,0.0012697212,0.0040266123,0.0072895503,0.0008820641,0.0015706059,0.20792112],"category_scores_gemma":[0.005278396,0.00033793753,0.0003269173,0.0022660517,0.000845237,0.0026036424,0.003982527,0.0018583055,0.13396585],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000033363165,0.000024166698,0.00071573426,0.00006894774,0.000001788839,0.00004131024,0.00037392514,0.000024640713,0.00014641507,0.0047648028,0.8753256,0.11850937],"study_design_scores_gemma":[6.4960534e-7,0.0000056924628,0.00091948174,0.000044843186,4.14615e-7,0.000055186792,0.00026017518,0.000012258229,0.000012981754,0.0002781613,0.9984085,0.0000017256821],"about_ca_topic_score_codex":0.003845637,"about_ca_topic_score_gemma":0.0086854845,"teacher_disagreement_score":0.20792112,"about_ca_system_score_codex":0.0022000512,"about_ca_system_score_gemma":0.0061319745,"threshold_uncertainty_score":0.69556546},"labels":[],"label_agreement":null},{"id":"W2800026723","doi":"10.1016/j.ijproman.2018.02.007","title":"Governance-as-practice for major public infrastructure projects: A case of multilevel project governing","year":2018,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":114,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"Social Sciences and Humanities Research Council of Canada","keywords":"Conceptualization; Corporate governance; Ostensive definition; Project governance; Performative utterance; Process (computing); Process management; Knowledge management; Political science; Sociology; Business; Computer science; Epistemology","score_opus":0.09028958687950508,"score_gpt":0.4295393342990354,"score_spread":0.3392497474195303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2800026723","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8542013,0.000100347206,0.013511979,0.0081016645,0.000025881092,0.00019918472,0.000030858795,0.00004076003,0.123788126],"genre_scores_gemma":[0.9946526,0.000025409017,0.0016627004,0.000109020344,0.000005739533,0.000040538223,0.0000062841727,0.0000072461426,0.003490455],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9920293,0.004464936,0.00018699224,0.00056005485,0.00062192447,0.0021368375],"domain_scores_gemma":[0.99056554,0.0046878587,0.0008895487,0.0011821233,0.0005609294,0.0021140457],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006273546,0.00024399633,0.00036720987,0.0007913769,0.0103880735,0.009893639,0.0019652206,0.0055838083,0.0064348034],"category_scores_gemma":[0.0132945385,0.0003615256,0.00069147005,0.001554407,0.012773178,0.0045371177,0.008090052,0.0038237495,0.00035561319],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000929023,0.00043745135,0.024807239,0.000060078877,0.00004963728,0.008683198,0.062888436,0.010859279,0.0010874185,0.86914843,0.0026986501,0.019187242],"study_design_scores_gemma":[0.0002818665,0.00077586836,0.058750167,0.00054800574,0.0001500834,0.0047600805,0.28382546,0.069495276,0.0017734527,0.4591688,0.1202887,0.0001823863],"about_ca_topic_score_codex":0.033194877,"about_ca_topic_score_gemma":0.053378936,"teacher_disagreement_score":0.033194877,"about_ca_system_score_codex":0.006611095,"about_ca_system_score_gemma":0.008445671,"threshold_uncertainty_score":0.06600332},"labels":[],"label_agreement":null},{"id":"W2800935059","doi":"10.1108/ijmpb-08-2017-0093","title":"Development of a crisis in a project: a process perspective","year":2018,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; Université du Québec à Rimouski","funders":"","keywords":"Relevance (law); Originality; Crisis management; Documentation; Phenomenon; Project management; Public relations; Sociology; Business; Qualitative research; Political science; Management; Economics; Computer science; Social science; Epistemology","score_opus":0.100278890658856,"score_gpt":0.43035735569041533,"score_spread":0.33007846503155935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2800935059","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4637298,0.0055757747,0.22300631,0.0347604,0.0007824085,0.0022480262,0.00020380742,0.00024382737,0.26944965],"genre_scores_gemma":[0.9703864,0.0020588706,0.019952329,0.0007471976,0.00009979475,0.0005793869,0.000056458557,0.000045935998,0.0060736337],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.97411376,0.020446295,0.00063326507,0.0009457694,0.002371473,0.0014895269],"domain_scores_gemma":[0.9760475,0.015483601,0.0025987055,0.001113,0.002444403,0.0023128523],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01799715,0.00077671657,0.0004241141,0.003629237,0.006031055,0.0138602145,0.0019047435,0.003114918,0.0039847335],"category_scores_gemma":[0.020401696,0.00051269116,0.00056743383,0.0028444647,0.017780831,0.012364379,0.009565144,0.0040907594,0.0005609617],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012755192,0.0005689041,0.0147440005,0.0011156083,0.000043124037,0.004565241,0.46702662,0.0021083648,0.0014900852,0.45507228,0.0038725503,0.04926565],"study_design_scores_gemma":[0.000059339854,0.0005411343,0.0104948105,0.00218507,0.00004837712,0.0035843572,0.6837002,0.0054483702,0.001647681,0.15841444,0.13378857,0.00008762489],"about_ca_topic_score_codex":0.0020718302,"about_ca_topic_score_gemma":0.0013618039,"teacher_disagreement_score":0.01799715,"about_ca_system_score_codex":0.0049210675,"about_ca_system_score_gemma":0.008603757,"threshold_uncertainty_score":0.09517914},"labels":[],"label_agreement":null},{"id":"W2801250026","doi":"10.5267/j.jpm.2018.3.002","title":"Application of TODIM (TOmada de Decisao Interativa Multicriterio) method for under-construction housing project selection in Kolkata","year":2018,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Architectural engineering; Engineering","score_opus":0.08777635587664524,"score_gpt":0.450878490566434,"score_spread":0.36310213468978875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2801250026","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3257854,0.00048319047,0.657011,0.00039144757,0.00008162965,0.00084122294,0.0012351604,0.0005887978,0.013582161],"genre_scores_gemma":[0.56798613,0.00018575015,0.42915413,0.00005321688,0.000010054829,0.00045362546,0.00058482215,0.00005010748,0.0015221622],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9966634,0.0017052311,0.000271899,0.0004325948,0.0005518522,0.00037504034],"domain_scores_gemma":[0.9968928,0.0019203947,0.0003683972,0.00014604432,0.00054066844,0.00013158128],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00436933,0.0009810097,0.0012836654,0.004451743,0.0009976127,0.0023731627,0.0010904092,0.0007158724,0.002948866],"category_scores_gemma":[0.007746464,0.00041759852,0.0014410259,0.0032331327,0.0004817971,0.0005849562,0.002316425,0.0007582877,0.00022049554],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00080100045,0.00038500674,0.05770609,0.0011325203,0.00044875464,0.0011966677,0.0021361446,0.36974576,0.0075670066,0.01983505,0.0038041316,0.5352419],"study_design_scores_gemma":[0.000084838895,0.00034406007,0.013361698,0.00016523594,0.00015720379,0.0004192041,0.0027577342,0.9532821,0.0066524013,0.01342349,0.009232009,0.000120166886],"about_ca_topic_score_codex":0.010909312,"about_ca_topic_score_gemma":0.017455073,"teacher_disagreement_score":0.010909312,"about_ca_system_score_codex":0.0026052014,"about_ca_system_score_gemma":0.0029346587,"threshold_uncertainty_score":0.023107529},"labels":[],"label_agreement":null},{"id":"W2802240555","doi":"10.1108/ijopm-01-2017-0010","title":"Project and processes: a convenient but simplistic dichotomy","year":2018,"lang":"en","type":"article","venue":"International Journal of Operations & Production Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Cognitive reframing; Typology; Originality; Computer science; Knowledge management; Value (mathematics); Process (computing); Strategic management; Management science; Process management; Business; Sociology; Marketing; Psychology; Qualitative research; Engineering","score_opus":0.07655961428951152,"score_gpt":0.4085326596800328,"score_spread":0.33197304539052125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2802240555","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06338271,0.040576514,0.39098457,0.11966056,0.008040266,0.0014094288,0.0007439378,0.0004755509,0.37472647],"genre_scores_gemma":[0.78255975,0.015025453,0.1469338,0.017623905,0.0025177095,0.004022989,0.00049145275,0.00032562294,0.030499317],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97773427,0.014805311,0.0013655156,0.0022886542,0.0030509701,0.0007552739],"domain_scores_gemma":[0.98604625,0.008181937,0.0013879497,0.0018440653,0.001701258,0.0008384757],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009913079,0.00097554654,0.0009927801,0.0050863503,0.0045302273,0.017180404,0.0019285438,0.004227882,0.0055861436],"category_scores_gemma":[0.018707003,0.0005357578,0.00091482286,0.0052598515,0.03871775,0.017463958,0.007510841,0.007554137,0.0013968586],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030815463,0.00002844113,0.0009061963,0.00018978817,0.0000074998284,0.00010473665,0.007760121,0.000102977545,0.00014853763,0.97653997,0.0022216712,0.011959351],"study_design_scores_gemma":[0.000045452227,0.00013008498,0.0024121893,0.0011903153,0.00003390322,0.00093826663,0.024077537,0.001141553,0.00024599754,0.7515837,0.21815333,0.000047698573],"about_ca_topic_score_codex":0.0038980984,"about_ca_topic_score_gemma":0.0026484998,"teacher_disagreement_score":0.017180404,"about_ca_system_score_codex":0.0059337323,"about_ca_system_score_gemma":0.0057275062,"threshold_uncertainty_score":0.05242598},"labels":[],"label_agreement":null},{"id":"W2803018976","doi":"10.5130/pmrp.pmiac2017.5662","title":"Transferring project management knowledge: lessons learned in open standards projects","year":2017,"lang":"en","type":"book-chapter","venue":"University of Technology, Sydney eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Genome Prairie","funders":"","keywords":"Knowledge management; Project management; OPM3; Project management triangle; Engineering management; Program management; Project charter; Business; Project stakeholder; Engineering; Engineering ethics; Computer science","score_opus":0.19070508496505625,"score_gpt":0.39688887543794227,"score_spread":0.206183790472886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2803018976","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12503667,0.05729862,0.18692662,0.06330171,0.002693718,0.00034027602,0.00015423371,0.00071713235,0.563531],"genre_scores_gemma":[0.58126515,0.06717735,0.12553859,0.003354477,0.0007971203,0.00032329542,0.00039797332,0.00057555834,0.22057047],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99723464,0.0013036397,0.000115088325,0.00018624628,0.0009632635,0.00019716396],"domain_scores_gemma":[0.993115,0.0050060065,0.00012344729,0.0005555348,0.00080049556,0.00039943255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0064551905,0.00045590696,0.00032163213,0.0008443712,0.0016194336,0.0065393206,0.0018901952,0.002064958,0.0050395024],"category_scores_gemma":[0.009997119,0.00027143682,0.00032978153,0.0015479296,0.003981215,0.009652678,0.0043896367,0.0027974267,0.0012340983],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030405468,0.00023521231,0.00052128517,0.00049612136,0.0000075850953,0.00031897798,0.02049412,0.0023897104,0.0004553812,0.17573623,0.02684411,0.7724708],"study_design_scores_gemma":[0.000027197484,0.00015879782,0.0019708192,0.0020572036,0.000008836183,0.000554207,0.018784378,0.0043714466,0.002143143,0.38358146,0.58629996,0.000042541084],"about_ca_topic_score_codex":0.0027466593,"about_ca_topic_score_gemma":0.0041653207,"teacher_disagreement_score":0.0065393206,"about_ca_system_score_codex":0.0024153248,"about_ca_system_score_gemma":0.003105607,"threshold_uncertainty_score":0.03413874},"labels":[],"label_agreement":null},{"id":"W2804589394","doi":"10.22215/timreview/723","title":"Time to Innovate: Reflections and Recommendations on Time Management for Innovation Managers","year":2013,"lang":"en","type":"article","venue":"Technology Innovation Management Review","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Competitive advantage; Process management; Knowledge management; Operations management; Marketing; Computer science; Economics","score_opus":0.07969366814238694,"score_gpt":0.4048171793016291,"score_spread":0.32512351115924215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2804589394","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010253433,0.08573483,0.001164578,0.90021545,0.008124623,0.00008618445,0.00005010213,0.000033652672,0.0035652367],"genre_scores_gemma":[0.06634157,0.43368268,0.013801985,0.44386688,0.014560203,0.0011510482,0.00019754759,0.0000999903,0.026298182],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9852645,0.009162651,0.0013059485,0.00056047644,0.0021758182,0.0015305639],"domain_scores_gemma":[0.9336453,0.042506922,0.0032347683,0.00072513125,0.013662711,0.006225108],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03072879,0.000742331,0.00088446314,0.001837061,0.0031564042,0.0095524,0.0035333922,0.010977128,0.008657144],"category_scores_gemma":[0.056089792,0.00038723295,0.001029674,0.0031104407,0.004914648,0.013441458,0.003325638,0.010898724,0.0024062847],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009522173,0.00024022946,0.0011874526,0.003219335,0.000028668399,0.0004644974,0.010928027,0.00043274305,0.00028667948,0.03381241,0.6965004,0.25280428],"study_design_scores_gemma":[0.000029009685,0.00015948967,0.0017908673,0.006803524,0.000031061263,0.0003057345,0.029113619,0.0001765166,0.0001951477,0.014332214,0.94698775,0.00007508855],"about_ca_topic_score_codex":0.010782482,"about_ca_topic_score_gemma":0.021970186,"teacher_disagreement_score":0.03072879,"about_ca_system_score_codex":0.0083708055,"about_ca_system_score_gemma":0.024826033,"threshold_uncertainty_score":0.16251129},"labels":[],"label_agreement":null},{"id":"W2805619904","doi":"10.4018/978-1-5225-5460-8.ch019","title":"Revisiting Project Definition/Initiation for Telemedicine Services","year":2018,"lang":"en","type":"book-chapter","venue":"Advances in healthcare information systems and administration book series","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Telehealth; Telemedicine; Telecare; Business model; Business; Knowledge management; Business plan; Process management; Conceptualization; Critical success factor; Health care; Computer science; Marketing; Political science","score_opus":0.07590663111530346,"score_gpt":0.37099978623307156,"score_spread":0.2950931551177681,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2805619904","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33770174,0.0022931711,0.45121154,0.07117772,0.0011937844,0.028988257,0.0012494597,0.0005596547,0.10562468],"genre_scores_gemma":[0.7620328,0.0014490645,0.20362048,0.004128979,0.00009974148,0.0211604,0.0007791993,0.00023664635,0.006492698],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.8036858,0.13279265,0.017770812,0.008780801,0.026313517,0.01065643],"domain_scores_gemma":[0.7541178,0.14488624,0.025962465,0.016246134,0.044241443,0.014545876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.1564077,0.0011023496,0.0011298852,0.005647119,0.011305528,0.02379933,0.004853653,0.004622229,0.0044425805],"category_scores_gemma":[0.14780512,0.0018211685,0.001862321,0.0076423506,0.016269935,0.017995594,0.016511567,0.011163968,0.0012420807],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019869438,0.0010603237,0.032007992,0.0024539027,0.000059602917,0.0011727151,0.27516142,0.003553984,0.0027547851,0.5150614,0.014280676,0.15223446],"study_design_scores_gemma":[0.00019070171,0.0010193044,0.03184645,0.0057515753,0.000088204266,0.00071786024,0.5938416,0.008998864,0.0053502037,0.11442291,0.23742236,0.00034991853],"about_ca_topic_score_codex":0.013551303,"about_ca_topic_score_gemma":0.013932023,"teacher_disagreement_score":0.1564077,"about_ca_system_score_codex":0.030878855,"about_ca_system_score_gemma":0.09430908,"threshold_uncertainty_score":0.8271729},"labels":[],"label_agreement":null},{"id":"W280978431","doi":"","title":"Building Alberta Infrastructure & Transportation as a Knowledge Intensive Organization","year":2006,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Knowledge transfer; Knowledge management; Excellence; Prosperity; Business; Strategic planning; Context (archaeology); Center of excellence; Knowledge economy; Computer science; Marketing; Political science","score_opus":0.01882920313562972,"score_gpt":0.3202436362492673,"score_spread":0.3014144331136376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W280978431","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2613446,0.0014989285,0.04595132,0.022254165,0.0002623104,0.00039818347,0.00008984388,0.0003889551,0.66781163],"genre_scores_gemma":[0.8793341,0.0012117265,0.050597988,0.0015027082,0.000059620488,0.000102088015,0.0001991478,0.00004977532,0.06694279],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9969791,0.0008072646,0.000047205373,0.00025962683,0.000916768,0.0009900184],"domain_scores_gemma":[0.99742305,0.00022787122,0.0001599162,0.00014621664,0.00048232192,0.0015606828],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002514087,0.0003110989,0.00013639235,0.0014299463,0.008970012,0.00956037,0.0016679864,0.0012539721,0.003893265],"category_scores_gemma":[0.0018062158,0.0002890845,0.00025911996,0.0015117503,0.0077596847,0.0029264467,0.006309558,0.0013117566,0.0010050439],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005266195,0.00050895434,0.020462075,0.0001468563,0.000041874002,0.0021945066,0.03317425,0.01114945,0.0028124677,0.71795744,0.04897773,0.16252168],"study_design_scores_gemma":[0.00003158454,0.0001942388,0.017315941,0.00027160134,0.00004176016,0.00054924976,0.05587911,0.006779894,0.0012769623,0.076948255,0.8406184,0.00009299525],"about_ca_topic_score_codex":0.39922923,"about_ca_topic_score_gemma":0.5793003,"teacher_disagreement_score":0.39922923,"about_ca_system_score_codex":0.019330654,"about_ca_system_score_gemma":0.07478424,"threshold_uncertainty_score":0.7938109},"labels":[],"label_agreement":null},{"id":"W2809831486","doi":"10.1108/ijmpb-01-2018-0002","title":"Balancing vertical and horizontal leadership in projects","year":2018,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Horizontal and vertical; Leadership style; Shared leadership; Context (archaeology); Nomination; Public relations; Empowerment; Political science; Mathematics","score_opus":0.19029416024523704,"score_gpt":0.36837399170324403,"score_spread":0.178079831458007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2809831486","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9171687,0.0008128255,0.027868787,0.0019124834,0.000111664056,0.00032789703,0.000027310227,0.00007804929,0.051692385],"genre_scores_gemma":[0.9955819,0.0001468722,0.0026392357,0.000089258014,0.000011090846,0.000072812756,0.000013075664,0.000008069246,0.0014377075],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.98087156,0.013389086,0.0005750536,0.00084456906,0.0023254517,0.0019942794],"domain_scores_gemma":[0.9873611,0.0048990473,0.0022885075,0.0007490054,0.0017344216,0.0029679541],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010385417,0.0002775955,0.00021874956,0.00088117743,0.003230732,0.004785444,0.00061856036,0.0004953076,0.002482377],"category_scores_gemma":[0.015363956,0.00027230254,0.00018773924,0.0010420202,0.003905836,0.0028717755,0.006434888,0.0011325603,0.00031405326],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045292065,0.00059640885,0.1535012,0.0013151412,0.000079040045,0.0027524407,0.28280416,0.0031287414,0.007563003,0.12607358,0.00655728,0.41517618],"study_design_scores_gemma":[0.00013969558,0.001476593,0.13741031,0.0015643097,0.000049194212,0.0019335669,0.6278334,0.0055788597,0.0030265201,0.06987894,0.15100388,0.00010467247],"about_ca_topic_score_codex":0.0011831953,"about_ca_topic_score_gemma":0.0016538957,"teacher_disagreement_score":0.010385417,"about_ca_system_score_codex":0.0019182565,"about_ca_system_score_gemma":0.005156078,"threshold_uncertainty_score":0.05492401},"labels":[],"label_agreement":null},{"id":"W2809884868","doi":"10.1177/875697280503600305","title":"Governance Regimes for Large Complex Projects","year":2005,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":228,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; Université du Québec à Montréal; Polytechnique Montréal","funders":"","keywords":"Project governance; Corporate governance; Dilemma; Context (archaeology); Process (computing); Project management; Process management; Project charter; Norwegian; Business; Project planning; Engineering; Management science; Management; Economics; Computer science","score_opus":0.13160993876878024,"score_gpt":0.39142624885944605,"score_spread":0.2598163100906658,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2809884868","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13269638,0.0011411142,0.61718893,0.008352047,0.00012412935,0.001200685,0.0001538076,0.00026588156,0.23887701],"genre_scores_gemma":[0.8991196,0.000367987,0.09235745,0.00025488817,0.000063625674,0.0011948219,0.0000978546,0.00004907518,0.0064945393],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9839171,0.008585191,0.0014003064,0.0016543474,0.0027772377,0.0016657396],"domain_scores_gemma":[0.98035884,0.007928065,0.004618207,0.0028572294,0.0023360183,0.0019016324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014733064,0.00033974153,0.000460429,0.002473709,0.0041278596,0.0083568655,0.0014695689,0.0018648764,0.004463657],"category_scores_gemma":[0.022831112,0.00045439237,0.0006807963,0.0015196096,0.012656646,0.007673692,0.0061947335,0.0027974478,0.0005081839],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000036643798,0.000018851775,0.001463241,0.000028171022,0.0000041830212,0.00008462884,0.0022217038,0.0029554653,0.00013004153,0.984643,0.0006732587,0.0077737784],"study_design_scores_gemma":[0.000020166392,0.000041820538,0.003296184,0.0002054145,0.0000077766235,0.00017015338,0.00419569,0.008829638,0.00018409954,0.9382884,0.044722278,0.000038428323],"about_ca_topic_score_codex":0.003145659,"about_ca_topic_score_gemma":0.0028128603,"teacher_disagreement_score":0.014733064,"about_ca_system_score_codex":0.0048355674,"about_ca_system_score_gemma":0.0057031536,"threshold_uncertainty_score":0.0779168},"labels":[],"label_agreement":null},{"id":"W2810025443","doi":"10.1177/875697280003100305","title":"Project Management in North America, Stability of the Concepts","year":2000,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Rimouski","funders":"","keywords":"Project management; Software project management; OPM3; Field (mathematics); Program management; Maturity (psychological); Project management triangle; Body of knowledge; Computer science; Knowledge management; Engineering management; Engineering; Software; Software development; Political science; Systems engineering; Mathematics","score_opus":0.07503855306449435,"score_gpt":0.37012960446976967,"score_spread":0.2950910514052753,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2810025443","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1335419,0.13065557,0.015898617,0.08712066,0.0017711866,0.0001703945,0.0003611248,0.00011741965,0.6303631],"genre_scores_gemma":[0.8913232,0.048405617,0.010146702,0.0045407973,0.00064066047,0.00029469072,0.00020844673,0.00005794791,0.044381868],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9958359,0.0016660411,0.0002407521,0.00064972416,0.0013085296,0.0002989997],"domain_scores_gemma":[0.99425334,0.002318477,0.0009097727,0.0002814702,0.0017150565,0.00052188773],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044825017,0.0002968552,0.00025752815,0.003977214,0.0055013685,0.0066185086,0.0007080761,0.001068059,0.006436388],"category_scores_gemma":[0.009759597,0.0002049424,0.00020201133,0.009205624,0.010463886,0.004122163,0.002083764,0.0016135774,0.00039736764],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051770556,0.00007592418,0.010972017,0.00053099316,0.000024449642,0.00026696705,0.040418837,0.0008163085,0.0003798961,0.67061806,0.042814586,0.23303014],"study_design_scores_gemma":[0.000011132843,0.000060653692,0.043855052,0.0010370164,0.000015802918,0.00035815197,0.027281126,0.00052665296,0.00018067191,0.084619164,0.8420275,0.000027181013],"about_ca_topic_score_codex":0.082374,"about_ca_topic_score_gemma":0.08205369,"teacher_disagreement_score":0.082374,"about_ca_system_score_codex":0.014477439,"about_ca_system_score_gemma":0.017524771,"threshold_uncertainty_score":0.1637891},"labels":[],"label_agreement":null},{"id":"W2810156263","doi":"10.1177/875697281604700508","title":"Organizational Design in Public Administration: Categorization of Project Management Offices","year":2016,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Knowledge management; Categorization; Relevance (law); Context (archaeology); OPM3; Project management; Process management; Business; Organizational architecture; Computer science; Engineering; Engineering management; Project management triangle; Systems engineering; Political science; Artificial intelligence","score_opus":0.1179920059003478,"score_gpt":0.35557857741089577,"score_spread":0.23758657151054796,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2810156263","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90534604,0.0008039192,0.04078736,0.0014526454,0.00006527221,0.00063737226,0.00017973797,0.00007915295,0.050648425],"genre_scores_gemma":[0.985546,0.00016419882,0.012196131,0.00006169429,0.000017575814,0.00035145527,0.00015458939,0.000017383676,0.0014908947],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.986621,0.0081498325,0.001086807,0.0006037207,0.0025301576,0.001008537],"domain_scores_gemma":[0.9879012,0.0043634297,0.0028486627,0.0017135676,0.001959497,0.0012135901],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006095687,0.00032745284,0.0002749282,0.004538324,0.0023421526,0.0039539686,0.0007708336,0.00089726795,0.002223918],"category_scores_gemma":[0.015126025,0.00021251745,0.00041863442,0.004126658,0.0034980474,0.0030069365,0.003741775,0.0006495363,0.00032958444],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040250146,0.00067349384,0.3119888,0.00055906264,0.000057638932,0.0005268346,0.09148783,0.0030805005,0.0041518677,0.25151297,0.003802603,0.33175582],"study_design_scores_gemma":[0.00014112284,0.00097002025,0.4397218,0.0009368901,0.000049099148,0.002071976,0.2174681,0.01822725,0.0018389624,0.1661895,0.15225086,0.0001344603],"about_ca_topic_score_codex":0.002067249,"about_ca_topic_score_gemma":0.001386291,"teacher_disagreement_score":0.006095687,"about_ca_system_score_codex":0.0028213742,"about_ca_system_score_gemma":0.0034495888,"threshold_uncertainty_score":0.03223747},"labels":[],"label_agreement":null},{"id":"W2810271314","doi":"10.1177/875697280203300303","title":"Project Management in the Information Systems and Information Technologies Industries","year":2002,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":203,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Critical success factor; Project management; Project management triangle; Extreme project management; Business; Knowledge management; Process management; Software project management; Project stakeholder; Information system; Project manager; Information technology; Project charter; Software; OPM3; Engineering management; Engineering; Computer science; Software development; Systems engineering","score_opus":0.08803690115058607,"score_gpt":0.32497813679694304,"score_spread":0.23694123564635697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2810271314","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8373661,0.012420847,0.037692107,0.025508877,0.00040773078,0.00095022045,0.00013191164,0.00015229199,0.08536992],"genre_scores_gemma":[0.9736699,0.0041764486,0.013613029,0.0010800872,0.00013940127,0.00044852193,0.000107663946,0.000026960637,0.006737994],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.97503895,0.01687588,0.0011027978,0.00090690143,0.004581583,0.0014938964],"domain_scores_gemma":[0.9709681,0.011762475,0.0056923535,0.0010470096,0.0053597353,0.0051702573],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016425297,0.0003409352,0.00030146705,0.0028249922,0.0064443215,0.0045208884,0.00081003446,0.0013328106,0.0028700365],"category_scores_gemma":[0.04023254,0.0003279177,0.00016906172,0.0036495847,0.0031898483,0.00274214,0.003873567,0.0012669693,0.0004666094],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001403544,0.000506695,0.12159727,0.0009957046,0.00007250384,0.00061797054,0.04173107,0.0025418256,0.0012805149,0.04226042,0.021473562,0.7667821],"study_design_scores_gemma":[0.000100878584,0.0022044426,0.30072752,0.0018031147,0.00007448947,0.0029424292,0.18219918,0.0065829707,0.0026147903,0.11544412,0.38510498,0.00020102454],"about_ca_topic_score_codex":0.0030846582,"about_ca_topic_score_gemma":0.0038315647,"teacher_disagreement_score":0.016425297,"about_ca_system_score_codex":0.0027573379,"about_ca_system_score_gemma":0.010839651,"threshold_uncertainty_score":0.08686632},"labels":[],"label_agreement":null},{"id":"W2810435343","doi":"10.1177/875697281604700308","title":"The Metaphysical Questions Every Project Practitioner Should Ask","year":2016,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières; University of Ottawa","funders":"","keywords":"Project management; Metaphysics; Project management triangle; Project charter; Extreme project management; OPM3; Style (visual arts); Process (computing); Project planning; Process management; Knowledge management; Sociology; Epistemology; Engineering ethics; Computer science; Business; Engineering; Philosophy; History; Systems engineering","score_opus":0.1349932438350591,"score_gpt":0.4090295276031853,"score_spread":0.27403628376812617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2810435343","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0131202275,0.0063667595,0.04766603,0.8348972,0.0018681041,0.00010237981,0.0000990157,0.00010009835,0.0957801],"genre_scores_gemma":[0.7024052,0.0150054125,0.086735144,0.1486991,0.0041849627,0.0009922523,0.00026060842,0.00038782245,0.041329466],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9845392,0.008972173,0.0009878764,0.0011432844,0.003114717,0.0012427978],"domain_scores_gemma":[0.96597856,0.019822197,0.0024671473,0.0024704307,0.0064989985,0.0027625747],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.023203025,0.00065293413,0.0010180707,0.0016730258,0.008593603,0.011271115,0.0033356654,0.013272057,0.009536726],"category_scores_gemma":[0.059086196,0.00089122227,0.0006210861,0.00196059,0.04572675,0.035072397,0.007777198,0.01824327,0.0033726883],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022773575,0.000075153555,0.00079051737,0.00024274168,0.000011793758,0.00023339276,0.036581416,0.0003306594,0.00042976404,0.9105984,0.033730682,0.016952671],"study_design_scores_gemma":[0.000013745543,0.000012256732,0.00041146064,0.0003682117,0.0000032912374,0.00020281195,0.0378989,0.0004698773,0.00014243077,0.87232345,0.08812744,0.000026202237],"about_ca_topic_score_codex":0.0046532014,"about_ca_topic_score_gemma":0.003123206,"teacher_disagreement_score":0.023203025,"about_ca_system_score_codex":0.0056029838,"about_ca_system_score_gemma":0.008351153,"threshold_uncertainty_score":0.122710824},"labels":[],"label_agreement":null},{"id":"W2810451685","doi":"10.1177/875697280503600403","title":"A Retrospective look at our Evolving Understanding of Project Success","year":2005,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":903,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"","keywords":"Project management triangle; Project management; Project portfolio management; Extreme project management; Project charter; Critical success factor; Work (physics); Process management; Context (archaeology); Project planning; Work breakdown structure; Project stakeholder; OPM3; Process (computing); Project governance; Project sponsorship; Knowledge management; Engineering; Business; Computer science; Corporate governance; Systems engineering","score_opus":0.128547094702031,"score_gpt":0.3856007039505976,"score_spread":0.2570536092485666,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2810451685","genre_codex":"empirical","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73940486,0.06409978,0.020304255,0.031315118,0.0008189438,0.00016308976,0.002034777,0.00017109305,0.14168812],"genre_scores_gemma":[0.91741,0.05576289,0.004149941,0.0022001034,0.0003966774,0.0001632728,0.0011632255,0.00015746613,0.018596496],"study_design_codex":"qualitative","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99156535,0.0047200723,0.0006758293,0.0006025419,0.0019121378,0.0005241019],"domain_scores_gemma":[0.954381,0.029226286,0.0052534067,0.0016920039,0.008194678,0.0012526395],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013403017,0.00044985153,0.00046540823,0.00818263,0.0033488953,0.006754123,0.00076577265,0.0008933413,0.005248873],"category_scores_gemma":[0.043105714,0.00043915334,0.00025873334,0.010632132,0.005512611,0.012555125,0.0044027143,0.003930127,0.0007706386],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012299744,0.00015320365,0.04368274,0.0013220634,0.00003798238,0.0010591324,0.5827697,0.0005317877,0.0009902803,0.10544638,0.027868867,0.23601495],"study_design_scores_gemma":[0.000003110883,0.00030356596,0.069322884,0.001996777,0.000022829978,0.0020851977,0.35973945,0.0003978626,0.00073381455,0.011453764,0.55383,0.00011063333],"about_ca_topic_score_codex":0.0079877265,"about_ca_topic_score_gemma":0.009934191,"teacher_disagreement_score":0.013403017,"about_ca_system_score_codex":0.0033662333,"about_ca_system_score_gemma":0.0026913802,"threshold_uncertainty_score":0.07088274},"labels":[],"label_agreement":null},{"id":"W2810491014","doi":"10.1177/875697280103200204","title":"The Dynamic Baseline Model for Project Management","year":2001,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Baseline (sea); Project management; Earned value management; Project management triangle; Computer science; Ask price; Process (computing); Process management; Project planning; Extreme project management; Matching (statistics); Engineering management; Engineering; Systems engineering; Project charter; OPM3; Business; Mathematics","score_opus":0.10329626606030866,"score_gpt":0.4008809646822951,"score_spread":0.29758469862198644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2810491014","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005367913,0.002528616,0.88342386,0.006901927,0.00039956445,0.00021395303,0.0009927755,0.0003921614,0.0997792],"genre_scores_gemma":[0.5889211,0.008000211,0.31787235,0.0017293306,0.0010408644,0.0024225484,0.0019738257,0.00041132708,0.07762841],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9959448,0.0018122854,0.00017617774,0.00061689847,0.0009495271,0.0005002948],"domain_scores_gemma":[0.9967289,0.0015999705,0.00048410584,0.00028871902,0.0005256828,0.00037264804],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004965422,0.0013928999,0.00095514616,0.0018988936,0.0014703892,0.005790562,0.003452426,0.003621384,0.016733764],"category_scores_gemma":[0.009872972,0.0006254376,0.0013418857,0.0034527243,0.002468779,0.007836464,0.0028510208,0.003986594,0.003973613],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001211401,0.000031379368,0.00030327745,0.000044342407,0.000015017139,0.000052206087,0.00011526921,0.054090507,0.000078145524,0.9299787,0.004573123,0.010705892],"study_design_scores_gemma":[0.000017158123,0.000031067688,0.00019523237,0.00004746609,0.0000092980135,0.000059667458,0.00008148111,0.11487501,0.000048191458,0.8437733,0.040834665,0.000027493437],"about_ca_topic_score_codex":0.010152977,"about_ca_topic_score_gemma":0.0073716813,"teacher_disagreement_score":0.016733764,"about_ca_system_score_codex":0.0060264175,"about_ca_system_score_gemma":0.0047307215,"threshold_uncertainty_score":0.055980027},"labels":[],"label_agreement":null},{"id":"W2810520785","doi":"10.1177/875697280703800108","title":"A Multi-Phase Research Program Investigating Project Management Offices (PMOS): The Results of Phase 1","year":2007,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":210,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"PMOS logic; Phase (matter); Order (exchange); Phenomenon; Business; Value (mathematics); Project management; Process management; Computer science; Engineering management; Knowledge management; Engineering; Systems engineering; Physics","score_opus":0.3802680401183883,"score_gpt":0.5566232269282443,"score_spread":0.176355186809856,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2810520785","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79047585,0.0039347103,0.0867877,0.00838909,0.00059319095,0.074814245,0.0022569704,0.0003182825,0.03243],"genre_scores_gemma":[0.68483204,0.0024613705,0.24081174,0.0029529687,0.00025619735,0.057295192,0.001436536,0.00009332607,0.009860691],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.95597434,0.030306442,0.0017839232,0.0028046335,0.0069588777,0.0021716906],"domain_scores_gemma":[0.82549375,0.102741964,0.012703043,0.0110529745,0.042537678,0.00547056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.057836898,0.00096938154,0.0015860467,0.0061016064,0.0039645554,0.0042507485,0.002686613,0.002399996,0.0043642777],"category_scores_gemma":[0.064369686,0.000965324,0.0017266998,0.005829953,0.0020819968,0.005302385,0.0058268644,0.00248273,0.00088195526],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003947452,0.019723948,0.11549963,0.008379457,0.00030606947,0.0005655713,0.0804752,0.0033111002,0.017101608,0.055758964,0.009031105,0.68590003],"study_design_scores_gemma":[0.003007254,0.056198534,0.44462848,0.0051827068,0.0009015635,0.00089486403,0.2806292,0.010972319,0.042962104,0.028901562,0.12514223,0.0005792605],"about_ca_topic_score_codex":0.004958729,"about_ca_topic_score_gemma":0.0057441867,"teacher_disagreement_score":0.057836898,"about_ca_system_score_codex":0.007424345,"about_ca_system_score_gemma":0.026250986,"threshold_uncertainty_score":0.30587447},"labels":[],"label_agreement":null},{"id":"W2810587289","doi":"10.1080/17452007.2018.1491384","title":"Organizational cultural compatibility of engineered wood products manufacturers and building specifiers in the Pacific Northwest","year":2018,"lang":"en","type":"article","venue":"Architectural Engineering and Design Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Compatibility (geochemistry); Architectural engineering; Engineering; Business","score_opus":0.03867988021771775,"score_gpt":0.2722352747757205,"score_spread":0.23355539455800275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2810587289","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9989644,0.000028826636,0.000037799357,0.00007480791,7.12563e-7,0.0000024873218,0.000004158482,2.9112604e-7,0.00088644354],"genre_scores_gemma":[0.9995592,0.000059890066,0.000080256716,0.000036628397,6.984704e-7,0.0000056661875,0.000011975706,6.783114e-7,0.00024499279],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9981382,0.0007704378,0.00009753547,0.00015169446,0.0005021512,0.0003400195],"domain_scores_gemma":[0.9948035,0.0017663285,0.0015286562,0.00020442427,0.000722353,0.00097479165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002826122,0.00015703954,0.00023801396,0.0010960157,0.0035181572,0.0022430995,0.0006022663,0.00039799506,0.0017029365],"category_scores_gemma":[0.0068809786,0.00028089414,0.000111597205,0.0013570407,0.002287505,0.0012665814,0.003353273,0.000833274,0.000073937066],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013828804,0.00018836862,0.79606956,0.000049928374,0.000042493244,0.0005509515,0.18009615,0.0001588698,0.0009964386,0.0011879666,0.00025935538,0.020261582],"study_design_scores_gemma":[0.0000048717725,0.00006279439,0.5868307,0.00006199656,0.000012562399,0.00012366098,0.41050157,0.00027982614,0.0003075042,0.00024926377,0.0015507914,0.0000145456315],"about_ca_topic_score_codex":0.09477428,"about_ca_topic_score_gemma":0.17098227,"teacher_disagreement_score":0.09477428,"about_ca_system_score_codex":0.003038173,"about_ca_system_score_gemma":0.004550661,"threshold_uncertainty_score":0.18844527},"labels":[],"label_agreement":null},{"id":"W2810809212","doi":"10.1177/875697280603700203","title":"Searching for Knowledge in the Pmbok® Guide","year":2006,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":63,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Project management; Tacit knowledge; Knowledge management; OPM3; Project management triangle; Engineering; Process management; Business; Engineering management; Computer science; Systems engineering","score_opus":0.1339098467140318,"score_gpt":0.4380648488733966,"score_spread":0.30415500215936475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2810809212","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05886752,0.007989802,0.26320073,0.08385242,0.0013681937,0.0013949554,0.0013243206,0.0032844807,0.57871765],"genre_scores_gemma":[0.19293258,0.010322415,0.47849038,0.019372845,0.00025563058,0.0020131865,0.0025569422,0.0012973298,0.2927587],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99627846,0.0016816253,0.00024034051,0.00026085234,0.0013337329,0.00020490981],"domain_scores_gemma":[0.9904439,0.0065807104,0.00041396893,0.0005409855,0.0014781124,0.0005423006],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037312524,0.00040589093,0.000518319,0.0025220609,0.0023142826,0.005888793,0.0014469879,0.0025486215,0.018227728],"category_scores_gemma":[0.014355222,0.00049686315,0.00032735328,0.0029735477,0.0036628959,0.009688064,0.0041166116,0.0024330982,0.009249144],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057616646,0.00018251379,0.0021730966,0.001085699,0.000010083777,0.0006822192,0.036029644,0.00092919497,0.0015428885,0.24443814,0.3360834,0.37678552],"study_design_scores_gemma":[0.00000971593,0.00003086412,0.0007328191,0.0004197366,0.0000031092916,0.00033750592,0.007766809,0.00049045647,0.00036877196,0.031611368,0.9582105,0.000018371917],"about_ca_topic_score_codex":0.004623418,"about_ca_topic_score_gemma":0.0097981235,"teacher_disagreement_score":0.018227728,"about_ca_system_score_codex":0.002873472,"about_ca_system_score_gemma":0.007623446,"threshold_uncertainty_score":0.060977817},"labels":[],"label_agreement":null},{"id":"W2810831185","doi":"10.1177/875697280303400307","title":"Effectiveness of Alliances between Operating Companies and Engineering Companies","year":2003,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Alliance; Business; Scope (computer science); Work (physics); Incentive; Marketing; Best practice; Industrial organization; Capital (architecture); Engineering; Economics; Management; Market economy","score_opus":0.07471592313172405,"score_gpt":0.35060391288102555,"score_spread":0.2758879897493015,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2810831185","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90237993,0.0011735935,0.0019678439,0.0011548202,0.00009484749,0.000117826596,0.00007662591,0.000037555415,0.09299678],"genre_scores_gemma":[0.99737954,0.0002763105,0.0002944686,0.000050366685,0.000031289943,0.000027405838,0.00005048961,0.000005629218,0.0018845758],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9776194,0.012964666,0.0015506481,0.001049196,0.0044060047,0.0024101182],"domain_scores_gemma":[0.8058305,0.11000576,0.0360612,0.007660336,0.01329804,0.02714426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01514777,0.00025255367,0.0003919635,0.0024585987,0.0024640674,0.004727279,0.0011276352,0.0011534474,0.012594913],"category_scores_gemma":[0.09022008,0.00029945298,0.00046242063,0.0013901913,0.0017773006,0.005203611,0.0066825217,0.0012541488,0.0012862197],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013859699,0.0016380107,0.79028136,0.000325998,0.00048975914,0.0008660528,0.014947584,0.0032559815,0.0007845676,0.027840372,0.0053726127,0.15281181],"study_design_scores_gemma":[0.00031754107,0.002552686,0.86741567,0.0006432265,0.00034462838,0.0013035601,0.058683105,0.0064990777,0.0010182107,0.025110986,0.035990987,0.00012022824],"about_ca_topic_score_codex":0.0010296709,"about_ca_topic_score_gemma":0.0010732772,"teacher_disagreement_score":0.01514777,"about_ca_system_score_codex":0.0014643555,"about_ca_system_score_gemma":0.002046505,"threshold_uncertainty_score":0.08011007},"labels":[],"label_agreement":null},{"id":"W2810981524","doi":"10.29379/jedem.v7i2.406","title":"International Challenges to Transformational Government: Enhanced Project Management Identifies Need for Existential Change","year":2015,"lang":"en","type":"article","venue":"JeDEM - eJournal of eDemocracy and Open Government","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Transformational leadership; Mindset; Existentialism; Government (linguistics); Change management (ITSM); Business; Process management; Political science; Public relations; Knowledge management; Computer science; Marketing","score_opus":0.2620223684405182,"score_gpt":0.41504053358993254,"score_spread":0.15301816514941435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2810981524","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2570638,0.0036976018,0.061808053,0.2534373,0.0007932396,0.00031528514,0.00010750899,0.0003731204,0.42240408],"genre_scores_gemma":[0.9810641,0.0012004941,0.007883153,0.0023369233,0.000056994893,0.00008809661,0.000039274397,0.00007003341,0.0072609265],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.98344433,0.010850236,0.0005157589,0.00076363777,0.002122934,0.0023032147],"domain_scores_gemma":[0.9859737,0.0049913246,0.0014326026,0.0018902422,0.0023291355,0.0033829485],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01454619,0.00035093707,0.0003139533,0.0013605977,0.006526254,0.019249493,0.0016039456,0.002391574,0.009117388],"category_scores_gemma":[0.016599933,0.0002937787,0.00039470298,0.0026042825,0.016967684,0.016594112,0.017777318,0.0049682385,0.0012086136],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006658607,0.00020312806,0.009710079,0.00047177012,0.000028107066,0.0006107343,0.07047858,0.0010038093,0.00072492054,0.7185296,0.021238903,0.17693385],"study_design_scores_gemma":[0.000019250549,0.00014581863,0.0095851915,0.0007892486,0.00001650089,0.0008410158,0.30941808,0.00200666,0.0009806433,0.3124586,0.36368063,0.000058296064],"about_ca_topic_score_codex":0.0019417874,"about_ca_topic_score_gemma":0.0027324958,"teacher_disagreement_score":0.019249493,"about_ca_system_score_codex":0.0062390086,"about_ca_system_score_gemma":0.017858353,"threshold_uncertainty_score":0.0769285},"labels":[],"label_agreement":null},{"id":"W2811165769","doi":"10.1177/875697281704800601","title":"From the Editors: Introducing the Special Issue on Megaprojects—“Symbolic and Sublime”","year":2017,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Sublime; Architectural engineering; Engineering; Computer science; Sociology; Aesthetics; Art","score_opus":0.06516276701231158,"score_gpt":0.3664108192508436,"score_spread":0.301248052238532,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2811165769","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00007854193,0.005510898,0.00025089065,0.12036477,0.87306666,0.000007847682,0.000036631332,0.000025731464,0.00065798394],"genre_scores_gemma":[0.00078332267,0.0038945486,0.00017226156,0.06394661,0.9272535,0.000021986065,0.000032830387,0.000062224586,0.0038327985],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.994915,0.0011303974,0.0007881078,0.000949372,0.0018307078,0.0003863484],"domain_scores_gemma":[0.9695705,0.012570457,0.002401304,0.0007923178,0.009997956,0.0046674656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006515489,0.0026194232,0.002190288,0.0030612738,0.003240804,0.01142061,0.0028550187,0.012377121,0.011267371],"category_scores_gemma":[0.035306234,0.00091557275,0.001575191,0.0021819596,0.0031443036,0.008845845,0.0037691288,0.020323327,0.008108904],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015479667,0.00000778925,0.00007981845,0.0001247449,0.0000060662737,0.000041038344,0.000043446358,0.000014276718,0.000038812213,0.0005001201,0.9947837,0.00434476],"study_design_scores_gemma":[0.00001607205,0.000023508484,0.000449651,0.00033292366,0.00002273903,0.0002502812,0.00019249297,0.00010374794,0.00008771248,0.0013405918,0.99715316,0.00002719049],"about_ca_topic_score_codex":0.001066257,"about_ca_topic_score_gemma":0.0033863669,"teacher_disagreement_score":0.012377121,"about_ca_system_score_codex":0.0019960108,"about_ca_system_score_gemma":0.003051632,"threshold_uncertainty_score":0.037693083},"labels":[],"label_agreement":null},{"id":"W2811238845","doi":"10.1177/875697280003100304","title":"Realistic Criteria for Project Manager Selection and Development","year":2000,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":103,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Project manager; Typology; Selection (genetic algorithm); Sample (material); Project management; Functional manager; Process management; Population; Business; Knowledge management; Project management triangle; Computer science; Operations management; Engineering management; Engineering; Project charter; Systems engineering; Sociology","score_opus":0.13883658755045342,"score_gpt":0.4136739062284086,"score_spread":0.2748373186779552,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2811238845","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4231493,0.0008761749,0.48300034,0.0036855096,0.00023123223,0.005862574,0.0007690537,0.00042081793,0.082004964],"genre_scores_gemma":[0.77015245,0.00022142522,0.22181165,0.000228339,0.00004060094,0.0033738695,0.00042022433,0.000045059456,0.003706474],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9527237,0.02753497,0.0052507827,0.0016076413,0.010487058,0.0023959838],"domain_scores_gemma":[0.93593967,0.035350464,0.007374949,0.0035374153,0.014112064,0.0036854616],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.032295328,0.00061826926,0.0005921021,0.004456936,0.0021409295,0.004155778,0.0015755061,0.0016952463,0.0055337655],"category_scores_gemma":[0.15130915,0.00038949135,0.00049416214,0.0027450088,0.0013117179,0.0018432838,0.0033784665,0.00090293563,0.0012645267],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013754705,0.0009851113,0.22748339,0.0015558804,0.00015768064,0.0014475145,0.019781735,0.02892395,0.009673395,0.28619528,0.024322225,0.3980983],"study_design_scores_gemma":[0.0008747592,0.0037952396,0.21468303,0.002108171,0.0002480116,0.0072529083,0.03679692,0.17533612,0.010690559,0.34901625,0.19863549,0.00056248315],"about_ca_topic_score_codex":0.0010801454,"about_ca_topic_score_gemma":0.002155488,"teacher_disagreement_score":0.032295328,"about_ca_system_score_codex":0.0019340641,"about_ca_system_score_gemma":0.003213877,"threshold_uncertainty_score":0.1707961},"labels":[],"label_agreement":null},{"id":"W2811248424","doi":"10.1177/875697281704800501","title":"From the Editors Isomorphism: A Challenge for the Project-Based Organization","year":2017,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Isomorphism (crystallography); Process management; Knowledge management; Management science; Engineering; Business; Computer science; Chemistry","score_opus":0.1292469691213517,"score_gpt":0.38613689547739627,"score_spread":0.2568899263560446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2811248424","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004074783,0.0032363634,0.008091711,0.921169,0.022374481,0.000023808901,0.000062664956,0.00013315934,0.040833917],"genre_scores_gemma":[0.4364693,0.010363687,0.024463248,0.31587297,0.09482173,0.00031808717,0.00028316493,0.0014733766,0.1159345],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97291034,0.013749167,0.0014194943,0.0023774356,0.007759539,0.0017840344],"domain_scores_gemma":[0.8820929,0.05396949,0.007057906,0.012830739,0.022562588,0.0214864],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.036360923,0.00050387584,0.0009911914,0.003089025,0.0118422285,0.033683542,0.0026758183,0.010046614,0.017812721],"category_scores_gemma":[0.10705449,0.00058002345,0.00061851443,0.0029069078,0.024178764,0.028997153,0.014252501,0.02434309,0.0043946076],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029280849,0.00006125079,0.00051257707,0.00010490907,0.0000198038,0.0001555273,0.0045755524,0.0001610877,0.00010550616,0.71555775,0.24088587,0.037830904],"study_design_scores_gemma":[0.000031146137,0.00002648279,0.00034589137,0.00018108865,0.000011672208,0.00011048669,0.006016813,0.00030646587,0.00016433232,0.5072228,0.48555452,0.000028320097],"about_ca_topic_score_codex":0.0024940001,"about_ca_topic_score_gemma":0.0032570718,"teacher_disagreement_score":0.036360923,"about_ca_system_score_codex":0.0062806043,"about_ca_system_score_gemma":0.023867983,"threshold_uncertainty_score":0.19229722},"labels":[],"label_agreement":null},{"id":"W2811260378","doi":"","title":"EVALUATING THE ROLE OF PROJECT TEAM FACTORS IN DETERMINING THE PROJECT SUCCESS: SCALE VALIDATION","year":2018,"lang":"en","type":"article","venue":"The Journal of Internet Banking and Commerce","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Task (project management); Scale (ratio); Project team; Engineering management; Operations research; Knowledge management; Engineering; Systems engineering","score_opus":0.13331332271929316,"score_gpt":0.42236311434989177,"score_spread":0.28904979163059863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2811260378","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99339455,0.0000669107,0.0040005776,0.000044508175,0.00001873536,0.00063124025,0.000046481146,0.000013911272,0.001783031],"genre_scores_gemma":[0.99200153,0.00007187552,0.0064232848,0.000015836806,0.000010310318,0.0010440347,0.00008148214,0.000007750595,0.00034388216],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98879576,0.0063469796,0.0011666564,0.00057945034,0.0026299206,0.0004812561],"domain_scores_gemma":[0.9353977,0.044845,0.0043254695,0.0031748528,0.01039567,0.0018612386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.024411567,0.0005307088,0.00050741475,0.0019615002,0.0009152893,0.0010507787,0.00056433387,0.00044288693,0.0013855605],"category_scores_gemma":[0.048542295,0.00033239948,0.00081326236,0.0011579125,0.0012192827,0.0009569935,0.0013920995,0.0008458674,0.00027026032],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005358617,0.0013491381,0.86775345,0.0003309443,0.00028458424,0.00017328182,0.013045461,0.0015120398,0.004156256,0.0008543733,0.000561322,0.10944333],"study_design_scores_gemma":[0.0001428366,0.004189899,0.95765823,0.00024865282,0.00021762786,0.00017361697,0.017855553,0.010879557,0.0043393876,0.0010542233,0.0031631559,0.00007723495],"about_ca_topic_score_codex":0.0010570252,"about_ca_topic_score_gemma":0.0014912459,"teacher_disagreement_score":0.024411567,"about_ca_system_score_codex":0.0007193064,"about_ca_system_score_gemma":0.0019553227,"threshold_uncertainty_score":0.12910229},"labels":[],"label_agreement":null},{"id":"W2811415777","doi":"10.1177/875697281804900101","title":"From the Editors Introducing Teaching Case Studies in <i>Project Management Journal</i>®","year":2018,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Engineering; Engineering management; Management science; Sociology; Engineering ethics; Computer science","score_opus":0.11843822040709212,"score_gpt":0.4255012096882595,"score_spread":0.3070629892811674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2811415777","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00019750532,0.0054072994,0.0006397845,0.098720275,0.89301884,0.000029540946,0.00003369052,0.00007047711,0.0018826097],"genre_scores_gemma":[0.002022916,0.007274854,0.00058728503,0.06986313,0.90457255,0.00008985846,0.00005829251,0.00013742177,0.01539354],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.990982,0.0019688986,0.0017209353,0.0009735733,0.0037880642,0.00056646747],"domain_scores_gemma":[0.9288881,0.028514307,0.0043956214,0.0018068184,0.026340825,0.010054379],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008832185,0.0021353217,0.001546123,0.004766259,0.0031925393,0.010488651,0.002979739,0.010102005,0.013478898],"category_scores_gemma":[0.064307354,0.00096636283,0.0012568784,0.00235345,0.003657531,0.005017837,0.0041539865,0.016136467,0.0100672655],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028135517,0.000019582336,0.00009962273,0.0002116123,0.000006954061,0.00017194067,0.00010287532,0.00003516792,0.00014355128,0.0004082199,0.9871559,0.011616395],"study_design_scores_gemma":[0.000016727825,0.000037600475,0.00035513254,0.00043269567,0.000012916465,0.0005292941,0.00016108078,0.00010203455,0.00016420595,0.00062961446,0.9975349,0.000023818675],"about_ca_topic_score_codex":0.0018082055,"about_ca_topic_score_gemma":0.005178634,"teacher_disagreement_score":0.013478898,"about_ca_system_score_codex":0.00314089,"about_ca_system_score_gemma":0.003988418,"threshold_uncertainty_score":0.046709597},"labels":[],"label_agreement":null},{"id":"W2883283652","doi":"10.25300/misq/2019/14505","title":"Responding—or Not—to Information Technology Project Risks: An Integrative Model1","year":2019,"lang":"en","type":"article","venue":"MIS Quarterly","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Theory of planned behavior; Knowledge management; Information technology; Psychology; Risk analysis (engineering); Management science; Computer science; Business; Engineering; Control (management); Artificial intelligence","score_opus":0.0844071075293679,"score_gpt":0.4136163052476247,"score_spread":0.3292091977182568,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2883283652","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7766506,0.00070437894,0.13333239,0.0057858555,0.00007754352,0.0005644159,0.0003575196,0.00019989841,0.08232736],"genre_scores_gemma":[0.97749126,0.00042657083,0.018590752,0.00021856134,0.000027480468,0.00033037597,0.0001835915,0.00002590422,0.002705551],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980236,0.0009590601,0.00007147307,0.0003848538,0.00033763694,0.00022336305],"domain_scores_gemma":[0.99376005,0.0042380467,0.0008012455,0.00022579453,0.0004586728,0.00051614636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029544355,0.0011544257,0.0006421951,0.0018343821,0.00082765793,0.0041604657,0.0017410798,0.001904293,0.005848247],"category_scores_gemma":[0.0073549836,0.000722301,0.0013559659,0.0010691584,0.0023910066,0.0035891454,0.0018640786,0.0016374282,0.0009072532],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00088681997,0.0033104557,0.3198571,0.0007605031,0.00076689955,0.0014903545,0.03412761,0.10313633,0.0050788624,0.42062712,0.0036463947,0.10631153],"study_design_scores_gemma":[0.00029388047,0.0012875834,0.1053066,0.00059162395,0.0006280982,0.0011007458,0.0104416665,0.57753557,0.0010065584,0.2908407,0.010761173,0.0002058676],"about_ca_topic_score_codex":0.0050726724,"about_ca_topic_score_gemma":0.0034838181,"teacher_disagreement_score":0.005848247,"about_ca_system_score_codex":0.001716252,"about_ca_system_score_gemma":0.003016013,"threshold_uncertainty_score":0.01956439},"labels":[],"label_agreement":null},{"id":"W2883714063","doi":"10.1061/(asce)me.1943-5479.0000639","title":"How to Improve Interface Management Behaviors in EPC Projects: Roles of Formal Practices and Social Norms","year":2018,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Procurement; Interface (matter); Knowledge management; Affect (linguistics); Project management; Psychology; Business; Computer science; Engineering; Marketing","score_opus":0.03898353472567932,"score_gpt":0.3395619891551394,"score_spread":0.3005784544294601,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2883714063","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9740863,0.000106872394,0.014772505,0.0010560076,0.000019688858,0.0001565071,0.000014313953,0.000074489304,0.009713236],"genre_scores_gemma":[0.99247724,0.00007817071,0.0068740128,0.000060468697,0.0000071977597,0.00010914728,0.000013149883,0.000010127292,0.00037040174],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9834372,0.0116799185,0.00075653935,0.00063010864,0.0028259566,0.00067031104],"domain_scores_gemma":[0.94008344,0.03182139,0.012423523,0.00451778,0.0076887785,0.0034650848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01863056,0.0004092207,0.00023438732,0.0012569323,0.0015234418,0.0035782703,0.0009660439,0.0007891358,0.0009927233],"category_scores_gemma":[0.06581049,0.0002624144,0.00021573169,0.00067442254,0.0027180018,0.0025693707,0.0024886737,0.0011411856,0.0001728446],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018624692,0.003266288,0.42870924,0.0006055067,0.00012213242,0.00042221826,0.0904291,0.003212029,0.008450411,0.011723909,0.0019956834,0.4508772],"study_design_scores_gemma":[0.00014342096,0.0019745093,0.74406683,0.00096666475,0.00014857801,0.00049331883,0.16021764,0.027781347,0.008926451,0.030699113,0.024305789,0.00027638327],"about_ca_topic_score_codex":0.0022425074,"about_ca_topic_score_gemma":0.0037580493,"teacher_disagreement_score":0.01863056,"about_ca_system_score_codex":0.00157792,"about_ca_system_score_gemma":0.0037503792,"threshold_uncertainty_score":0.09852904},"labels":[],"label_agreement":null},{"id":"W2884530029","doi":"10.4018/978-1-5225-3197-5.ch008","title":"A Framework for Understanding the Role of Project Culture for Organizational Project Maturity","year":2018,"lang":"en","type":"book-chapter","venue":"Advances in logistics, operations, and management science book series","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Maturity (psychological); Organizational culture; Knowledge management; OPM3; Project management; Process management; Business; Public relations; Sociology; Political science; Engineering; Project management triangle; Computer science; Systems engineering","score_opus":0.08264441736609927,"score_gpt":0.37459667512233774,"score_spread":0.29195225775623845,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2884530029","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018103132,0.0142573295,0.4486173,0.043398716,0.0006903342,0.00074094825,0.0005144841,0.00032003166,0.47335774],"genre_scores_gemma":[0.5675288,0.012142503,0.38699535,0.003214047,0.00042873298,0.002507899,0.0005845182,0.00019113731,0.026407061],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99604356,0.0025213095,0.00021628485,0.0003711243,0.00047204705,0.00037561796],"domain_scores_gemma":[0.9942678,0.0033791722,0.0006409017,0.00037167227,0.0007592294,0.0005811158],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0072882455,0.0015728627,0.0006785389,0.006169217,0.003969226,0.011178627,0.0029574248,0.0035905868,0.00914507],"category_scores_gemma":[0.007333799,0.0006188644,0.001166933,0.005626134,0.014567149,0.01334736,0.0041711,0.00530589,0.0013968413],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002406081,0.000020282161,0.00024097899,0.00004850894,0.0000025930506,0.000053617903,0.002795677,0.00037808393,0.000064112464,0.98913157,0.0011980733,0.0060641128],"study_design_scores_gemma":[0.0000081321405,0.000034701614,0.0013794071,0.00050838775,0.0000075465487,0.00015887838,0.0068253283,0.0029443817,0.00011925899,0.9199422,0.06804305,0.000028788847],"about_ca_topic_score_codex":0.008778163,"about_ca_topic_score_gemma":0.0069309413,"teacher_disagreement_score":0.011178627,"about_ca_system_score_codex":0.008860293,"about_ca_system_score_gemma":0.007274235,"threshold_uncertainty_score":0.06428623},"labels":[],"label_agreement":null},{"id":"W2885119536","doi":"10.1061/9780784481271.040","title":"Age Related Ethical Lapses in Construction Engineering Site Management Decisions","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Framing (construction); Construction industry; Construction management; Set (abstract data type); Engineering; Knowledge management; Computer science; Management; Economics; Construction engineering","score_opus":0.1503422948264254,"score_gpt":0.4392322085707341,"score_spread":0.2888899137443087,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2885119536","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9985299,0.000036714417,0.00017732283,0.000083426305,0.000004290682,0.000019625571,0.0000059152885,0.0000011220113,0.0011416043],"genre_scores_gemma":[0.99931145,0.00005193939,0.00022015406,0.00004205687,0.000004230315,0.000023762585,0.000011442948,0.0000010599535,0.00033388933],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9906384,0.00569602,0.00073784206,0.0005088848,0.0015965281,0.0008223028],"domain_scores_gemma":[0.9272454,0.042905197,0.01952707,0.0028242997,0.0043393504,0.0031587095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011577014,0.00019188707,0.00021730187,0.000855855,0.0012469378,0.0021472762,0.00033750932,0.0007640117,0.0039494],"category_scores_gemma":[0.054692537,0.0002764361,0.000297114,0.00038586618,0.0021370843,0.0014384867,0.0018737939,0.0014141822,0.00041830592],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005846901,0.0018109953,0.9136037,0.00008323756,0.000043203836,0.00046273068,0.046866834,0.0007140602,0.0017056605,0.0015523434,0.00055557553,0.032017007],"study_design_scores_gemma":[0.00004613077,0.0017412393,0.90198827,0.0001265232,0.0000384264,0.0006136139,0.08505107,0.0017364718,0.0017792596,0.003076517,0.003725994,0.00007653205],"about_ca_topic_score_codex":0.0017171957,"about_ca_topic_score_gemma":0.0030671703,"teacher_disagreement_score":0.011577014,"about_ca_system_score_codex":0.0013502976,"about_ca_system_score_gemma":0.0013838026,"threshold_uncertainty_score":0.06122583},"labels":[],"label_agreement":null},{"id":"W2885395152","doi":"10.1061/9780784481271.069","title":"A Framework for Modeling Construction Organizational Competencies and Performance","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Computer science; Organizational performance; Fuzzy logic; Knowledge management; Organizational engineering; Organizational learning; Identification (biology); Artificial intelligence; Management science; Organizational behavior and human resources; Engineering","score_opus":0.22181770195907294,"score_gpt":0.4382395628311331,"score_spread":0.21642186087206014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2885395152","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005944528,0.0005196166,0.9750728,0.0009125845,0.000052569823,0.00011558311,0.00045241098,0.00014943849,0.016780518],"genre_scores_gemma":[0.4731893,0.0029363565,0.510486,0.00018040036,0.0001528651,0.001377167,0.0009128919,0.00008436644,0.010680687],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9991743,0.00036035522,0.000051175226,0.00010808553,0.0002303642,0.000075646654],"domain_scores_gemma":[0.99910283,0.00047460158,0.00013471219,0.000048712904,0.00019345182,0.000045717738],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018786158,0.0013928083,0.0005434277,0.0018558467,0.0005483794,0.0020530028,0.0019742835,0.0016780484,0.0034571257],"category_scores_gemma":[0.0032435453,0.00035407668,0.00095835025,0.0017503359,0.0009778836,0.0020950562,0.00094350823,0.0012417476,0.0004971204],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009816717,0.000047460017,0.0007362679,0.00009371229,0.00003955907,0.000080457736,0.0001754972,0.57664156,0.0005058852,0.40766147,0.0015209636,0.012487348],"study_design_scores_gemma":[0.000009574425,0.000048956328,0.0004445169,0.00008585869,0.000019287823,0.000043421576,0.000117751675,0.82279855,0.0002106201,0.1652813,0.0109141115,0.000026039543],"about_ca_topic_score_codex":0.018322153,"about_ca_topic_score_gemma":0.011661476,"teacher_disagreement_score":0.018322153,"about_ca_system_score_codex":0.0025609368,"about_ca_system_score_gemma":0.0025611145,"threshold_uncertainty_score":0.036431015},"labels":[],"label_agreement":null},{"id":"W2885735840","doi":"10.1007/978-3-319-97925-0_8","title":"An Analysis of IT Project Management Across Companies in an International Scenario","year":2018,"lang":"en","type":"book-chapter","venue":"Communications in computer and information science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"Conselho Nacional de Desenvolvimento Científico e Tecnológico","keywords":"Business; Project management; Knowledge management; Engineering management; Computer science; Engineering; Systems engineering","score_opus":0.1482533408528462,"score_gpt":0.44549378232191433,"score_spread":0.29724044146906814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2885735840","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95689124,0.00038615667,0.005620961,0.0013721518,0.000013749294,0.00006662609,0.00043953795,0.000028230346,0.0351813],"genre_scores_gemma":[0.99470985,0.00016336566,0.0015027161,0.000041010844,0.000006466785,0.000024495328,0.0002591829,0.000010000251,0.0032829836],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991602,0.00036295914,0.000029447476,0.00007316496,0.00017401563,0.00020031579],"domain_scores_gemma":[0.9981603,0.0008590997,0.00034687007,0.000043107484,0.0003112753,0.00027939497],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001001219,0.0002231145,0.00023280998,0.0015993309,0.00094099314,0.002152915,0.00077679544,0.00079581025,0.004742845],"category_scores_gemma":[0.002869226,0.00014867366,0.00044322753,0.004349643,0.0005216363,0.0018045291,0.0010263373,0.00076313555,0.00020526783],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008514961,0.0011372912,0.30633658,0.00029376295,0.00037206884,0.003151361,0.00899868,0.23440753,0.003164908,0.23229794,0.015329606,0.19365877],"study_design_scores_gemma":[0.000049457358,0.0009528978,0.58585006,0.00023371639,0.00019547672,0.00070202333,0.053200077,0.28274593,0.0012047619,0.044818237,0.029957816,0.00008948433],"about_ca_topic_score_codex":0.0326877,"about_ca_topic_score_gemma":0.0366844,"teacher_disagreement_score":0.0326877,"about_ca_system_score_codex":0.0032490566,"about_ca_system_score_gemma":0.0011675389,"threshold_uncertainty_score":0.06499487},"labels":[],"label_agreement":null},{"id":"W2887324060","doi":"10.1061/9780784481271.068","title":"Quantifying the Impact of Change on the Progress of Construction Projects","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Scope (computer science); Earned value management; Schedule; Change order; Project management; Value engineering; Baseline (sea); Computer science; Construction management; Quality (philosophy); Change management (ITSM); Engineering; Risk analysis (engineering); Project planning; Systems engineering; Operations management; Civil engineering; Project charter; Business","score_opus":0.5998759696896633,"score_gpt":0.5340393017317845,"score_spread":0.06583666795787879,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2887324060","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9858767,0.00021144412,0.0096181985,0.00006102735,0.000013108064,0.000116080584,0.0005618847,0.00007468006,0.0034668187],"genre_scores_gemma":[0.99276286,0.00012933626,0.0060743894,0.000005902228,0.0000067096944,0.000048110673,0.00050723954,0.000011344751,0.0004540981],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99078393,0.0023597318,0.00073200837,0.0006844089,0.0050113252,0.00042858656],"domain_scores_gemma":[0.96412414,0.023043863,0.0061803283,0.0016353033,0.004496345,0.0005198738],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0054088593,0.00052935205,0.00040296628,0.004518306,0.00036178797,0.0015391756,0.00045158563,0.00054880214,0.0009331729],"category_scores_gemma":[0.028475028,0.00023923274,0.00045592783,0.0033668685,0.00058596535,0.001594048,0.00090081093,0.0005749867,0.00021222627],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005595849,0.0003865505,0.7015472,0.0002898087,0.00019658344,0.00031428956,0.0013658941,0.09474396,0.0074203787,0.0010626982,0.00055901415,0.19155419],"study_design_scores_gemma":[0.000011490154,0.0011849533,0.9081296,0.00005115706,0.00007415103,0.00012656797,0.0016408061,0.07950594,0.006382375,0.0006803952,0.0021499542,0.00006245864],"about_ca_topic_score_codex":0.0065065376,"about_ca_topic_score_gemma":0.00857194,"teacher_disagreement_score":0.0065065376,"about_ca_system_score_codex":0.001283388,"about_ca_system_score_gemma":0.0009331715,"threshold_uncertainty_score":0.028605103},"labels":[],"label_agreement":null},{"id":"W2888253973","doi":"10.1177/8756972818788773","title":"An Analysis of Innovation in Oil and Gas Projects","year":2018,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor; University of Calgary","funders":"","keywords":"Extant taxon; Outcome (game theory); Work (physics); Project management; Business; Industrial organization; Knowledge management; Marketing; Process management; Operations management; Engineering; Economics; Management; Computer science; Microeconomics","score_opus":0.08597990767829825,"score_gpt":0.3916707654682399,"score_spread":0.30569085778994165,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2888253973","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99920136,0.000017264836,0.00024644908,0.000015657317,5.5642244e-7,0.000009519412,0.00003600546,0.000002362727,0.000470843],"genre_scores_gemma":[0.99931896,0.000022529113,0.00023886375,0.0000025908664,0.0000016221703,0.00002420338,0.00007527494,0.0000013162819,0.00031464233],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99762625,0.001227578,0.000095812204,0.0002103219,0.00043404097,0.00040597364],"domain_scores_gemma":[0.9817706,0.010734478,0.0040660235,0.0005479281,0.0014317954,0.0014491449],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025228674,0.00019592,0.0004098848,0.0020472296,0.0006071869,0.001094435,0.00041946894,0.00043705458,0.0026696776],"category_scores_gemma":[0.013122988,0.00017040792,0.0005231734,0.0025056885,0.0006312055,0.00057321985,0.0015238225,0.0006652824,0.00023687408],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018578106,0.00023811664,0.9824928,0.000030859388,0.00008784862,0.00016486514,0.0010921134,0.0033231021,0.0007328454,0.0008032077,0.00007622665,0.010772228],"study_design_scores_gemma":[0.0000060494876,0.00039231128,0.98963845,0.000010649308,0.0000308165,0.000074774944,0.0013622479,0.0069705094,0.0003618141,0.0005327181,0.0006054377,0.000014298675],"about_ca_topic_score_codex":0.0047527384,"about_ca_topic_score_gemma":0.0042412146,"teacher_disagreement_score":0.0047527384,"about_ca_system_score_codex":0.0009812915,"about_ca_system_score_gemma":0.0013864165,"threshold_uncertainty_score":0.0133423805},"labels":[],"label_agreement":null},{"id":"W2888495254","doi":"10.1016/j.ijproman.2018.07.006","title":"Corrigendum to “A model to control environmental performance of project execution process based on greenhouse gas emissions using earned value management” [Int. J. Proj. Manag. 36 (3) (April 2018) 397-413]","year":2018,"lang":"en","type":"erratum","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Ontario Centres of Excellence; Ryerson University","keywords":"Greenhouse gas; Earned value management; Project management; Control (management); Work breakdown structure; Schedule; Work (physics); Carbon tax; Environmental economics; Process (computing); Project planning; Operations research; Engineering; Environmental resource management; Environmental science; Computer science; Systems engineering; Project charter; Economics; Mechanical engineering","score_opus":0.07822955925435883,"score_gpt":0.36729233988414955,"score_spread":0.28906278062979074,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2888495254","genre_codex":"editorial","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00035172945,0.003095674,0.003776338,0.12772262,0.84175164,0.000101678794,0.0023874133,0.0006763515,0.020136502],"genre_scores_gemma":[0.013072522,0.012382887,0.009171655,0.122330934,0.13549165,0.00048502308,0.005100647,0.0016127443,0.7003519],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99547297,0.0006688768,0.0005738622,0.00052269734,0.0024285824,0.00033294098],"domain_scores_gemma":[0.97190183,0.0066209263,0.0006662213,0.0010666888,0.019271856,0.00047247214],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031726148,0.0023709564,0.0021375215,0.0035946118,0.004032378,0.004467114,0.004355216,0.008882275,0.07033156],"category_scores_gemma":[0.04058356,0.0010630009,0.0023917083,0.0035920474,0.0022188015,0.0035363082,0.002590749,0.0092155505,0.039038945],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012638481,0.000009758636,0.00006071112,0.00007216325,0.0000054624384,0.00013356186,0.000026633747,0.00021337286,0.000036225694,0.0014722488,0.9943204,0.003636852],"study_design_scores_gemma":[0.000027608101,0.000030446803,0.0011491353,0.00030206624,0.000042455147,0.0001722519,0.00015526943,0.001285994,0.00038024856,0.003954018,0.99243087,0.000069804846],"about_ca_topic_score_codex":0.14195606,"about_ca_topic_score_gemma":0.15383956,"teacher_disagreement_score":0.14195606,"about_ca_system_score_codex":0.0074834065,"about_ca_system_score_gemma":0.006814467,"threshold_uncertainty_score":0.28225958},"labels":[],"label_agreement":null},{"id":"W2889732248","doi":"10.1504/ijise.2018.10015905","title":"Using a fuzzy MCDM approach to measure project complexity: a case study","year":2018,"lang":"en","type":"article","venue":"International Journal of Industrial and Systems Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Interdependence; Multiple-criteria decision analysis; Project management; Variety (cybernetics); Complexity management; Computer science; Fuzzy logic; Hierarchy; Context (archaeology); Operations research; Process (computing); Project management triangle; Management science; Systems engineering; Engineering; Artificial intelligence; Business","score_opus":0.5054502906541717,"score_gpt":0.41687712278040595,"score_spread":0.08857316787376573,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889732248","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8933731,0.00028946222,0.09645217,0.00055721676,0.00002006717,0.0007948203,0.00023991334,0.000050323255,0.0082229385],"genre_scores_gemma":[0.8946918,0.00017223001,0.104003586,0.000023405693,0.0000048949632,0.00021876999,0.00006196497,0.0000072526614,0.0008161069],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99613357,0.002544156,0.00019226882,0.00018510003,0.00074365595,0.00020129664],"domain_scores_gemma":[0.9930507,0.0050278,0.0003433611,0.00038359792,0.0009799136,0.00021467223],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006269275,0.00052227906,0.00069630134,0.0032483276,0.0017309042,0.0013946202,0.0009456938,0.0019263147,0.0018545479],"category_scores_gemma":[0.007966749,0.00035702626,0.00070791546,0.003237391,0.0009524009,0.0010330456,0.0012270409,0.0007404146,0.0001282435],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015810437,0.0034543215,0.07646301,0.0018000569,0.00034256504,0.013792047,0.014436616,0.4634002,0.021058885,0.046170443,0.0036976656,0.35380316],"study_design_scores_gemma":[0.0002556808,0.0011041745,0.025392175,0.00025418436,0.00013566353,0.0019061229,0.011223246,0.9311669,0.010923507,0.010149046,0.0073358463,0.00015341469],"about_ca_topic_score_codex":0.009222214,"about_ca_topic_score_gemma":0.01765947,"teacher_disagreement_score":0.009222214,"about_ca_system_score_codex":0.002439956,"about_ca_system_score_gemma":0.0013884824,"threshold_uncertainty_score":0.0331555},"labels":[],"label_agreement":null},{"id":"W2891421616","doi":"10.1051/matecconf/201819604089","title":"Use of Pairwise Comparison Method in Road-and-Bridge Tenders","year":2018,"lang":"en","type":"article","venue":"MATEC Web of Conferences","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Laurentian University","funders":"","keywords":"Call for bids; Pairwise comparison; Bridge (graph theory); Diversification (marketing strategy); Point (geometry); Computer science; Function (biology); Operations research; Presentation (obstetrics); Quality (philosophy); Procurement; Transport engineering; Business; Marketing; Engineering; Mathematics; Artificial intelligence","score_opus":0.2893054254026324,"score_gpt":0.42937669625778296,"score_spread":0.1400712708551506,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2891421616","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015533203,0.00052015577,0.9748361,0.00021366416,0.00022782442,0.0010531441,0.00025024268,0.00021085211,0.0071547856],"genre_scores_gemma":[0.1817163,0.0003614589,0.813387,0.00008493466,0.00017869484,0.0019888603,0.00038144313,0.00023405768,0.0016672321],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.7836406,0.18587407,0.0044795973,0.006505849,0.017857268,0.0016425253],"domain_scores_gemma":[0.784516,0.18697706,0.0062850155,0.0065894225,0.014078035,0.0015544847],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.08394565,0.0015636629,0.0026473363,0.008416956,0.0021969425,0.004018541,0.0038443403,0.0018312791,0.013562372],"category_scores_gemma":[0.22111039,0.00071106735,0.0021784035,0.010272673,0.0032812033,0.0045712423,0.0044365465,0.003290531,0.0016786156],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018185785,0.00056600163,0.0070103654,0.0032442864,0.001154542,0.0008291977,0.0073925327,0.05454063,0.0046843532,0.23146082,0.00881041,0.6784883],"study_design_scores_gemma":[0.0005024144,0.003430043,0.013443641,0.0010346898,0.0006547594,0.0015169542,0.0061636968,0.35679975,0.011521381,0.5346344,0.069781035,0.00051718485],"about_ca_topic_score_codex":0.0012092268,"about_ca_topic_score_gemma":0.0014795772,"teacher_disagreement_score":0.08394565,"about_ca_system_score_codex":0.0024224333,"about_ca_system_score_gemma":0.002936938,"threshold_uncertainty_score":0.44395232},"labels":[],"label_agreement":null},{"id":"W2892260798","doi":"10.1108/ecam-04-2017-0068","title":"Quality cost of material procurement in construction projects","year":2018,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Procurement; Quality assurance; Quality (philosophy); Cost reduction; Process (computing); Operations management; Computer science; Business; Risk analysis (engineering); Process management; Engineering; Marketing","score_opus":0.05916172171760306,"score_gpt":0.3398656009049161,"score_spread":0.280703879187313,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2892260798","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89074546,0.0016244489,0.07749336,0.00097497937,0.00007086986,0.00046759952,0.00039227644,0.000098353004,0.028132686],"genre_scores_gemma":[0.99523735,0.00019846635,0.0031383154,0.00001157032,0.0000046632904,0.000049674258,0.00006338123,0.000011974088,0.0012846297],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9954432,0.0020811546,0.00018769622,0.00021062116,0.0015284552,0.0005488514],"domain_scores_gemma":[0.98703325,0.0089408755,0.0017798503,0.0004556184,0.0014417227,0.00034857632],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0042535304,0.0004379771,0.0004191076,0.0014512644,0.0006765269,0.0029798325,0.0009053266,0.0008093736,0.0031334222],"category_scores_gemma":[0.014227615,0.0005944867,0.0007545059,0.0016903422,0.0011266689,0.0017324341,0.0009938708,0.001114709,0.00027907203],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030376963,0.00019246449,0.04223927,0.00025388936,0.00007099494,0.00036209854,0.00029086307,0.8750052,0.0013064925,0.025940444,0.0008341648,0.053200364],"study_design_scores_gemma":[0.000041827545,0.0008885306,0.0767535,0.00018115283,0.00011403764,0.00035905943,0.001603975,0.8965665,0.0028379937,0.016730469,0.0037940477,0.00012891422],"about_ca_topic_score_codex":0.01584655,"about_ca_topic_score_gemma":0.011824699,"teacher_disagreement_score":0.01584655,"about_ca_system_score_codex":0.0072818287,"about_ca_system_score_gemma":0.003581776,"threshold_uncertainty_score":0.052833557},"labels":[],"label_agreement":null},{"id":"W2893976955","doi":"10.7492/ijaec.2018.005","title":"Critical Determinants of Public Construction Tendering Costs","year":2018,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Procurement; Business; Marketing","score_opus":0.032832409394483376,"score_gpt":0.3358092901199381,"score_spread":0.3029768807254547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2893976955","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99042904,0.0001041562,0.0011279286,0.0006781249,0.0000070736633,0.000028481672,0.00009369218,0.000015388685,0.007516101],"genre_scores_gemma":[0.9995297,0.000014495305,0.00005569813,0.00000654655,0.000004462784,0.0000033112133,0.000017971939,0.0000024291983,0.0003654452],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99735546,0.00097273226,0.00010836911,0.00018691424,0.00041409698,0.0009624458],"domain_scores_gemma":[0.8267693,0.14701487,0.013440883,0.0028276637,0.0055987686,0.0043484406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037723333,0.00025574077,0.00048327196,0.0014487919,0.00092554576,0.0039345627,0.00084500783,0.0014061875,0.015962815],"category_scores_gemma":[0.04753344,0.0004829261,0.0004452823,0.001190445,0.0015444697,0.0019068824,0.00085317495,0.002385975,0.00059672905],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016086011,0.0013400894,0.8705617,0.00015615151,0.00025556743,0.0010800352,0.002005814,0.024070255,0.0037792018,0.05718407,0.002390994,0.03556755],"study_design_scores_gemma":[0.00008230572,0.00029240837,0.9362902,0.00005962329,0.00019353461,0.00026869672,0.0057209567,0.027032169,0.0012303075,0.02685698,0.0019261424,0.00004675402],"about_ca_topic_score_codex":0.010650904,"about_ca_topic_score_gemma":0.01312008,"teacher_disagreement_score":0.015962815,"about_ca_system_score_codex":0.0027977617,"about_ca_system_score_gemma":0.003049819,"threshold_uncertainty_score":0.053400934},"labels":[],"label_agreement":null},{"id":"W2894942650","doi":"10.14288/1.0371611","title":"Measuring strengths, weaknesses, and the value of project management in construction projects : a project management assessment tool","year":2018,"lang":"en","type":"article","venue":"Open Collections","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Strengths and weaknesses; Project management; Program management; Engineering management; Process management; Engineering; Systems engineering","score_opus":0.08125199394374412,"score_gpt":0.3761063536570592,"score_spread":0.2948543597133151,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2894942650","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7336559,0.0009881856,0.21754956,0.0032215735,0.00012094646,0.0036191535,0.00075358764,0.0004305734,0.039660446],"genre_scores_gemma":[0.70220965,0.00060941424,0.29288828,0.0001638884,0.00003615337,0.002363287,0.0004070145,0.00003741704,0.0012848728],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.94641894,0.02935801,0.0062175784,0.0014783916,0.015372746,0.001154204],"domain_scores_gemma":[0.8896564,0.07212084,0.012797362,0.0037383907,0.02006223,0.0016246808],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.038942855,0.0009522553,0.00075951463,0.015763951,0.002417902,0.0074154837,0.0016574615,0.001383128,0.0011143602],"category_scores_gemma":[0.08960985,0.0006130624,0.00078903657,0.009757768,0.0029737188,0.008276641,0.0063548987,0.0019195972,0.0003208946],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021898371,0.0011828656,0.16959362,0.00276421,0.00028904885,0.00044674164,0.06828149,0.012891799,0.00643104,0.036027808,0.0050472664,0.69682515],"study_design_scores_gemma":[0.00020415573,0.004264898,0.36553615,0.007038225,0.00071751745,0.0021919913,0.25990963,0.10385927,0.020931492,0.121107616,0.113123685,0.00111539],"about_ca_topic_score_codex":0.0013114879,"about_ca_topic_score_gemma":0.0026523618,"teacher_disagreement_score":0.038942855,"about_ca_system_score_codex":0.0040215557,"about_ca_system_score_gemma":0.0071192808,"threshold_uncertainty_score":0.20595199},"labels":[],"label_agreement":null},{"id":"W2895707362","doi":"10.5430/mos.v5n3p29","title":"Work Motivation in Temporary Organizations: Establishing Theoretical Corpus","year":2018,"lang":"en","type":"article","venue":"Management and Organizational Studies","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières; Brandon University","funders":"","keywords":"Moderation; Event (particle physics); Perspective (graphical); Work (physics); Knowledge management; Job characteristic theory; Actor–network theory; Job design; Computer science; Psychology; Epistemology; Social psychology; Job performance; Sociology; Job satisfaction; Artificial intelligence; Social science; Engineering","score_opus":0.057641148359187495,"score_gpt":0.32541109819610153,"score_spread":0.26776994983691405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2895707362","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7400655,0.010629643,0.09738902,0.011278119,0.00031960793,0.0009829781,0.0010504515,0.000120665594,0.13816394],"genre_scores_gemma":[0.9729893,0.0042578764,0.01862775,0.0002708752,0.000056611672,0.0012523388,0.0006546924,0.000032205488,0.0018584351],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9957808,0.0025168408,0.0004055134,0.00044145907,0.0006140337,0.00024125958],"domain_scores_gemma":[0.9729776,0.022031335,0.0020370088,0.001077166,0.001346469,0.00053046853],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0080654435,0.0003179068,0.0005416148,0.007711021,0.004748511,0.0061932453,0.0018638968,0.0014555238,0.0033262956],"category_scores_gemma":[0.018207302,0.00038711264,0.00037692775,0.0076605617,0.0076422784,0.007109214,0.005113203,0.0022067134,0.0002735383],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004335873,0.0002746709,0.020868184,0.0012429429,0.00001954126,0.000703532,0.115730025,0.0016579868,0.000243425,0.7559425,0.0034143971,0.09985947],"study_design_scores_gemma":[0.000042339347,0.0001553098,0.068755865,0.0051133116,0.000051694988,0.0008110631,0.373019,0.01797578,0.000955506,0.3625837,0.17041878,0.0001176673],"about_ca_topic_score_codex":0.00397091,"about_ca_topic_score_gemma":0.0055007352,"teacher_disagreement_score":0.0080654435,"about_ca_system_score_codex":0.005541344,"about_ca_system_score_gemma":0.0041268384,"threshold_uncertainty_score":0.042654693},"labels":[],"label_agreement":null},{"id":"W2897083799","doi":"10.1093/oxfordhb/9780198732242.013.3","title":"Cycles in Megaproject Development","year":2017,"lang":"en","type":"book","venue":"Oxford University Press eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Megaproject; Popularity; Variety (cybernetics); Business; Political science; Computer science; Economics; Management","score_opus":0.12155765640417791,"score_gpt":0.31566120994110913,"score_spread":0.1941035535369312,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897083799","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00722465,0.029434226,0.04235098,0.012170862,0.0010855579,0.00018617263,0.00021333015,0.00016719152,0.907167],"genre_scores_gemma":[0.30674306,0.07956068,0.03088286,0.0054620607,0.0010861844,0.0007802711,0.0005827704,0.00057786645,0.57432425],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.997497,0.0010574718,0.000085967295,0.00029818004,0.0008602647,0.00020102908],"domain_scores_gemma":[0.9977701,0.0013649192,0.00013747404,0.0002197336,0.00033987884,0.00016799875],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002495886,0.00054647616,0.00033018357,0.0011359758,0.0013657276,0.006857618,0.0010161521,0.0012951011,0.014178856],"category_scores_gemma":[0.0052495203,0.0003633889,0.0003530823,0.002429714,0.0053431573,0.006471027,0.002884749,0.002519494,0.0030533327],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008521159,0.000013612554,0.00019688325,0.00009593959,0.0000028813174,0.000034923523,0.0013966992,0.0012445457,0.000053427866,0.9046268,0.02624625,0.066079475],"study_design_scores_gemma":[0.0000034217196,0.000015025173,0.00036415696,0.00025939159,0.0000018929213,0.00006982588,0.0008771076,0.0007256988,0.0001226771,0.32733667,0.6702142,0.000009938404],"about_ca_topic_score_codex":0.0032988207,"about_ca_topic_score_gemma":0.0042662406,"teacher_disagreement_score":0.014178856,"about_ca_system_score_codex":0.006197347,"about_ca_system_score_gemma":0.0044308,"threshold_uncertainty_score":0.04743296},"labels":[],"label_agreement":null},{"id":"W2899011591","doi":"10.1080/09537287.2018.1535675","title":"Make-or-break during production: shedding light on change-orders, rework and contractors margin in construction","year":2019,"lang":"en","type":"article","venue":"Production Planning & Control","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Australian Research Council","keywords":"Rework; Profit margin; Change order; Margin (machine learning); Operations management; Business; CLARITY; Profit (economics); Total cost; Production (economics); Project management; Marketing; Engineering; Economics; Computer science; Microeconomics; Accounting; Management; Project planning","score_opus":0.04689761962377002,"score_gpt":0.32086341674985774,"score_spread":0.2739657971260877,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2899011591","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99384224,0.00054117624,0.0011555004,0.0005061221,0.0000070711967,0.000018898147,0.00001782085,0.000010172167,0.0039008672],"genre_scores_gemma":[0.9992748,0.000121114994,0.00029198502,0.000019791496,0.0000061149326,0.0000059947724,0.0000109194625,0.0000043949804,0.00026490857],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98286897,0.008371592,0.00085634796,0.0006885381,0.00595335,0.001261134],"domain_scores_gemma":[0.8985766,0.058403995,0.03132327,0.002583289,0.005620671,0.0034921162],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012162005,0.00030616048,0.00031349267,0.0011375601,0.0013926724,0.0030517087,0.0010236708,0.0007997284,0.0019589541],"category_scores_gemma":[0.060185507,0.00027301745,0.00024647478,0.0011469864,0.0033940147,0.0030593826,0.0019239263,0.0013691279,0.00026806106],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009863119,0.0009627027,0.774097,0.000247012,0.00007998737,0.0007030818,0.025371393,0.00823404,0.0022942657,0.0046846448,0.00084493775,0.18149458],"study_design_scores_gemma":[0.000014510738,0.00063714804,0.9628254,0.00012687035,0.000023208844,0.00031567083,0.025504474,0.0038711436,0.001118284,0.0027695762,0.0027392446,0.000054288354],"about_ca_topic_score_codex":0.008220618,"about_ca_topic_score_gemma":0.015521439,"teacher_disagreement_score":0.012162005,"about_ca_system_score_codex":0.0040284544,"about_ca_system_score_gemma":0.0025656582,"threshold_uncertainty_score":0.06431955},"labels":[],"label_agreement":null},{"id":"W2899419623","doi":"10.1139/cjce-2018-0249","title":"Financial issues in construction companies: bibliometric analysis and trends","year":2018,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Finance; Capital structure; Identification (biology); Scopus; Productivity; Business; Economics; Political science; Economic growth","score_opus":0.03213582071558255,"score_gpt":0.29759412789064926,"score_spread":0.2654583071750667,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2899419623","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":"methods","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":"methods","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75824094,0.1217928,0.0016268184,0.0032494073,0.00021522111,0.00039482917,0.06941221,0.00038153533,0.044686366],"genre_scores_gemma":[0.8544774,0.09420368,0.004499306,0.00025095377,0.00040973036,0.000462996,0.04158995,0.00007770568,0.004028299],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9938421,0.0007246662,0.0015069172,0.00058739743,0.0029691104,0.00036986853],"domain_scores_gemma":[0.96845186,0.014840702,0.0077489438,0.0008329127,0.007475287,0.0006502788],"candidate_categories":["metaresearch","bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.004169967,0.000391487,0.001040153,0.16340406,0.0009835707,0.004911722,0.0006076087,0.0006357369,0.0027320737],"category_scores_gemma":[0.01872271,0.00023648729,0.0009753072,0.20316792,0.0006949115,0.0032267512,0.0018122637,0.0004366188,0.0007587402],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030264573,0.00015804051,0.60931337,0.019538734,0.00071320264,0.0007998329,0.0086342385,0.0008622258,0.0023391403,0.006853356,0.022723917,0.32776135],"study_design_scores_gemma":[0.000014266465,0.0000871864,0.9038234,0.0030643742,0.00044414354,0.0011725989,0.010533014,0.001350394,0.0010585691,0.0016071821,0.07677297,0.00007193863],"about_ca_topic_score_codex":0.007373091,"about_ca_topic_score_gemma":0.00960521,"teacher_disagreement_score":0.99583006,"about_ca_system_score_codex":0.001715654,"about_ca_system_score_gemma":0.0033071954,"threshold_uncertainty_score":0.022053182},"labels":[],"label_agreement":null},{"id":"W2900331467","doi":"","title":"Internal assessment of organizational management practices for small to medium size general contractors in Atlantic Canada","year":2015,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Operations management; Environmental resource management; Engineering; Economics","score_opus":0.10864473839838207,"score_gpt":0.4002702382701412,"score_spread":0.2916254998717591,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2900331467","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99698323,0.000052796284,0.00010666403,0.00015798402,0.0000034668444,0.000045583613,0.00021974528,0.000008584697,0.002422015],"genre_scores_gemma":[0.9959991,0.0000591708,0.0002678838,0.000048707676,0.0000015578252,0.000021623715,0.0002100115,0.000005660164,0.0033864155],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9968263,0.00039370137,0.0001434168,0.00026433435,0.0014197633,0.00095249846],"domain_scores_gemma":[0.9770627,0.0019820218,0.0017598744,0.0004836824,0.013799305,0.0049125575],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028023603,0.00022002806,0.00030358406,0.0024404456,0.0057261838,0.0030963717,0.0017428244,0.00047005533,0.001578425],"category_scores_gemma":[0.00968957,0.00031284956,0.0002609128,0.003240234,0.002250002,0.00049390784,0.0020875917,0.00078454893,0.00025682713],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022346264,0.00018298229,0.933273,0.000046012603,0.000035974146,0.00014652005,0.030194111,0.0006727855,0.0012774545,0.00065549795,0.0018556631,0.031436548],"study_design_scores_gemma":[0.000005047106,0.000056763485,0.9642968,0.000021157226,0.0000067852657,0.000016306823,0.03253892,0.00060185516,0.0001916835,0.0000414317,0.0022059553,0.000017363936],"about_ca_topic_score_codex":0.9917212,"about_ca_topic_score_gemma":0.99757296,"teacher_disagreement_score":0.09169906,"about_ca_system_score_codex":0.09169906,"about_ca_system_score_gemma":0.07652654,"threshold_uncertainty_score":0.66532636},"labels":[],"label_agreement":null},{"id":"W2900522130","doi":"10.21608/auej.2017.19248","title":"TOWARDS APPRAISAL AND IMPROVEMENT OF PROJECT MANAGEMENT PRACTICES FOR EGYPTIAN CONSTRUCTION CONTRACTORS","year":2017,"lang":"en","type":"article","venue":"Journal of Al-Azhar University Engineering Sector","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering management; Business; Project appraisal; Construction engineering; Project management; Engineering; Process management; Operations management; Systems engineering","score_opus":0.0613711072285439,"score_gpt":0.3494278507398085,"score_spread":0.2880567435112646,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2900522130","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.955612,0.0064161024,0.010714063,0.0039734524,0.00009600695,0.0013763481,0.00040603743,0.00006386701,0.021342084],"genre_scores_gemma":[0.96592706,0.0059428383,0.02454603,0.00016162814,0.000021977075,0.0004557047,0.00038244922,0.000010212865,0.00255197],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99137115,0.0034245804,0.001161007,0.00033769142,0.003220841,0.00048466335],"domain_scores_gemma":[0.9798433,0.0037426814,0.0031251672,0.00034850975,0.012151258,0.0007891027],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013662168,0.00042771667,0.0003541003,0.0064419406,0.0012854475,0.0032864378,0.0007025044,0.0004720971,0.0009673969],"category_scores_gemma":[0.021907153,0.00022648058,0.0004178713,0.0040557515,0.00062906276,0.002074393,0.0018478207,0.0007460311,0.00020819095],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017264737,0.00035371922,0.15201452,0.0027497457,0.000052725678,0.00065209897,0.073173955,0.00087764073,0.0035844345,0.0043505845,0.005220935,0.7567971],"study_design_scores_gemma":[0.000027194568,0.0009668462,0.6392686,0.005238545,0.00013444423,0.00064408913,0.28358632,0.003925426,0.004879356,0.0018375874,0.05937884,0.000112833775],"about_ca_topic_score_codex":0.010073003,"about_ca_topic_score_gemma":0.013827468,"teacher_disagreement_score":0.013662168,"about_ca_system_score_codex":0.0057111904,"about_ca_system_score_gemma":0.012703561,"threshold_uncertainty_score":0.07225335},"labels":[],"label_agreement":null},{"id":"W2901394394","doi":"10.21608/auej.2017.19281","title":"A SURVEY OF PROJECT MANAGEMENT MATURITY FOR CONSTRUCTION CONTRACTORS IN EGYPT: THE CURRENT STATUS","year":2017,"lang":"en","type":"article","venue":"Journal of Al-Azhar University Engineering Sector","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Maturity (psychological); Capability Maturity Model; Documentation; Excellence; Service Integration Maturity Model; Variety (cybernetics); Operational excellence; Process management; Business; Project management; Program management; Best practice; Operations management; Marketing; Engineering; Computer science; Economics; Management; Systems engineering","score_opus":0.07930448740774278,"score_gpt":0.33411154855608477,"score_spread":0.254807061148342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901394394","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9871597,0.0063198516,0.00033881178,0.0016049646,0.0000156753,0.000062177365,0.00044023656,0.000009582402,0.0040490082],"genre_scores_gemma":[0.98795635,0.009516588,0.00051969045,0.0003083304,0.000010837064,0.000046016845,0.0004673542,0.0000065936297,0.0011681906],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99788207,0.00039873272,0.0004095629,0.00011646433,0.0008147221,0.0003783859],"domain_scores_gemma":[0.9920791,0.001732025,0.0026101628,0.00015435352,0.0026869038,0.00073760736],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036012547,0.00018009548,0.00030442196,0.002456525,0.0007169289,0.0015555745,0.00045668797,0.00050984416,0.0016490653],"category_scores_gemma":[0.008071775,0.00025060933,0.00027897305,0.003512785,0.00051021803,0.0015846866,0.0007893129,0.00058282976,0.00027456146],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001324117,0.00013543302,0.81408554,0.0013295169,0.0000385565,0.00052155496,0.02370587,0.0001349987,0.0011243183,0.0009893194,0.0035714118,0.15423109],"study_design_scores_gemma":[0.0000039677284,0.0001427346,0.8954647,0.0007327695,0.000020552341,0.0009278733,0.07698343,0.00015463227,0.00038249083,0.00016579087,0.024993546,0.000027331751],"about_ca_topic_score_codex":0.011226958,"about_ca_topic_score_gemma":0.011439765,"teacher_disagreement_score":0.011226958,"about_ca_system_score_codex":0.002092008,"about_ca_system_score_gemma":0.0035794012,"threshold_uncertainty_score":0.022323191},"labels":[],"label_agreement":null},{"id":"W2901461253","doi":"10.3846/ijspm.2018.6270","title":"MODELING RISKS IN REAL ESTATE DEVELOPMENT PROJECTS: A CASE FOR EGYPT","year":2018,"lang":"en","type":"article","venue":"International Journal of Strategic Property Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Cairo University; University of Alberta","keywords":"Fault tree analysis; Fuzzy logic; Delphi method; Tree diagram; Real estate; Risk management; Risk analysis (engineering); Computer science; Fuzzy number; Actuarial science; Fuzzy set; Econometrics; Mathematics; Statistics; Business; Reliability engineering; Engineering; Finance; Artificial intelligence","score_opus":0.4280215471125621,"score_gpt":0.4450555001420363,"score_spread":0.017033953029474247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901461253","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97296685,0.00029486115,0.015965464,0.0007516425,0.0000087632,0.00014042102,0.00015074776,0.000040628463,0.0096804835],"genre_scores_gemma":[0.9854989,0.00047262904,0.010261345,0.000027035621,0.000004390916,0.00005039814,0.000062437415,0.000008546461,0.0036144482],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916494,0.0003989416,0.000046514953,0.00006866274,0.00015066908,0.00017027091],"domain_scores_gemma":[0.9987405,0.0007408759,0.00016518237,0.000079559715,0.00017027748,0.000103725964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013247088,0.00065170316,0.0002992923,0.0011722037,0.0012578574,0.0021392892,0.001026724,0.0019676997,0.0014927087],"category_scores_gemma":[0.0019579886,0.00030039917,0.00078401976,0.0014459229,0.00092459033,0.0012500928,0.0015395391,0.00086759735,0.00016987225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005537166,0.0012281057,0.06674615,0.00051815406,0.00014491598,0.034992766,0.009586884,0.7548764,0.0041198535,0.054077376,0.0025085341,0.07064726],"study_design_scores_gemma":[0.00014343682,0.0006856101,0.026602238,0.00030099513,0.000167354,0.005690986,0.032931168,0.87987345,0.007460497,0.024978178,0.021022825,0.0001432345],"about_ca_topic_score_codex":0.026288243,"about_ca_topic_score_gemma":0.026621545,"teacher_disagreement_score":0.026288243,"about_ca_system_score_codex":0.0036740834,"about_ca_system_score_gemma":0.0021090605,"threshold_uncertainty_score":0.052270472},"labels":[],"label_agreement":null},{"id":"W2902568138","doi":"10.5430/jms.v10n1p1","title":"A Model of the Critical Success Factors for the Neom Project in the Context of a Project Management Information System","year":2018,"lang":"en","type":"article","venue":"Journal of Management and Strategy","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Critical success factor; Project management; Context (archaeology); Project management triangle; Extreme project management; Process management; Engineering management; Project planning; Information system; Project charter; OPM3; Business; Knowledge management; Engineering; Computer science; Systems engineering; Geography","score_opus":0.14360158326564504,"score_gpt":0.3795590667864508,"score_spread":0.23595748352080576,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2902568138","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63164353,0.001007624,0.15639089,0.01024781,0.0001277964,0.0014535338,0.0012769713,0.00027330162,0.19757865],"genre_scores_gemma":[0.9768173,0.000401299,0.016782675,0.00007719305,0.000011709464,0.00057909143,0.0001903497,0.000011489051,0.0051288195],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99881256,0.00059742143,0.00006144661,0.00015305988,0.00018515249,0.00019034791],"domain_scores_gemma":[0.99523914,0.0029889718,0.00057821564,0.00008259985,0.000722691,0.00038839667],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023975964,0.001026345,0.0003081106,0.0040196422,0.0015090895,0.004397248,0.0012131284,0.0018174725,0.007651712],"category_scores_gemma":[0.0044349143,0.00039506302,0.00077305926,0.0027332976,0.0017823295,0.0033666238,0.0014305129,0.0014106856,0.0006257604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044014334,0.0009688109,0.05682623,0.0008972572,0.00015947108,0.0030792712,0.0228553,0.1548834,0.0026703454,0.6915166,0.0070866137,0.05861659],"study_design_scores_gemma":[0.0003228716,0.0012203759,0.04360556,0.0014314619,0.00032382782,0.0012306126,0.04481722,0.7086302,0.0014868234,0.1517974,0.04488685,0.0002467719],"about_ca_topic_score_codex":0.021248884,"about_ca_topic_score_gemma":0.018579358,"teacher_disagreement_score":0.021248884,"about_ca_system_score_codex":0.0075341724,"about_ca_system_score_gemma":0.009521217,"threshold_uncertainty_score":0.054664552},"labels":[],"label_agreement":null},{"id":"W2902798055","doi":"10.5430/jms.v9n4p47","title":"Competitive Strategies and Performance of Construction Companies in Kisumu County, Kenya","year":2018,"lang":"en","type":"article","venue":"Journal of Management and Strategy","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cost leadership; Competitive advantage; Marketing; Business; Market penetration; Order (exchange); Market share; Sample (material); Industrial organization; Strategic management; Product (mathematics); Operations management; Economics","score_opus":0.05090067194038994,"score_gpt":0.3259486358975337,"score_spread":0.27504796395714376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2902798055","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9995493,0.00004262181,0.000006047855,0.000022491819,4.0710566e-7,0.000004865635,0.000042627624,2.5375874e-7,0.00033135217],"genre_scores_gemma":[0.9994778,0.00007830496,0.00003543481,0.0000065933127,5.448361e-7,0.000005806361,0.00006739844,2.9874977e-7,0.00032782517],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99961275,0.00008287869,0.00003504268,0.000038807066,0.000088175126,0.00014238094],"domain_scores_gemma":[0.99892324,0.00022181192,0.00041659045,0.000020626212,0.00018462868,0.00023322273],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005829486,0.00023277005,0.00016087022,0.0013504454,0.0012761841,0.0008904923,0.00026004756,0.00040056012,0.001480886],"category_scores_gemma":[0.0012307146,0.00019892844,0.000114619696,0.0013713602,0.0005169834,0.0003714097,0.00058956805,0.0002669165,0.00024531427],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058689737,0.00012928543,0.98995286,0.00003216586,0.000015600905,0.00028413231,0.003462155,0.0001895916,0.0006985906,0.00015063453,0.0002038153,0.00482259],"study_design_scores_gemma":[0.0000029711846,0.00011956797,0.9883292,0.000017219914,0.000005942865,0.00010357974,0.010661338,0.00018489173,0.00012387737,0.000016381005,0.0004270768,0.000007903062],"about_ca_topic_score_codex":0.06179943,"about_ca_topic_score_gemma":0.20113498,"teacher_disagreement_score":0.06179943,"about_ca_system_score_codex":0.0017214302,"about_ca_system_score_gemma":0.0013077566,"threshold_uncertainty_score":0.122879446},"labels":[],"label_agreement":null},{"id":"W2903294237","doi":"10.1108/ijmpb-03-2018-0038","title":"A pragmatic sociological examination of projectification","year":2018,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Originality; Sociology; Project management; Ideology; Conceptual framework; Field (mathematics); Value (mathematics); Management science; Epistemology; Engineering ethics; Management; Social science; Politics; Computer science; Political science; Economics; Law; Engineering; Qualitative research","score_opus":0.1080135379494932,"score_gpt":0.3970508004130043,"score_spread":0.2890372624635111,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2903294237","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0959681,0.0047847223,0.20820011,0.04165888,0.0008867765,0.0006767366,0.0000899541,0.000108004126,0.64762676],"genre_scores_gemma":[0.9658957,0.0011132525,0.021151377,0.00093695556,0.0001315808,0.0005214627,0.0000313738,0.00008176618,0.010136481],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.97896326,0.01755653,0.00035388826,0.0005286658,0.0017985156,0.0007992407],"domain_scores_gemma":[0.982856,0.012660605,0.0010987289,0.0013486748,0.0014276205,0.00060827576],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0127598895,0.00056717184,0.00054524106,0.0041899486,0.011800519,0.00958342,0.0016269834,0.0025226357,0.004813294],"category_scores_gemma":[0.021322977,0.0004735985,0.00065957,0.0034367596,0.057311617,0.013263206,0.013654716,0.0042883423,0.0002992264],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004670107,0.0000094337665,0.000116387375,0.000029546654,0.0000010836635,0.0000984143,0.01856213,0.00012154886,0.000051661165,0.97740877,0.00057349424,0.003022856],"study_design_scores_gemma":[0.000013363572,0.00003391882,0.0005568949,0.0003335295,0.0000048970496,0.0005230591,0.091585144,0.0013809517,0.00032374592,0.7220774,0.1831512,0.000015903086],"about_ca_topic_score_codex":0.0031715988,"about_ca_topic_score_gemma":0.0024660258,"teacher_disagreement_score":0.0127598895,"about_ca_system_score_codex":0.0069571873,"about_ca_system_score_gemma":0.0048362855,"threshold_uncertainty_score":0.06748158},"labels":[],"label_agreement":null},{"id":"W2904275044","doi":"10.3390/buildings8120183","title":"Collaboration Enables Innovative Timber Structure Adoption in Construction","year":2018,"lang":"en","type":"article","venue":"Buildings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval; Kruger (Canada); Natural Sciences and Engineering Research Council of Canada","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Stakeholder; Limiting; Supply chain; Construction industry; Engineering; Business; Architectural engineering; Construction engineering; Marketing; Management; Economics","score_opus":0.038990094306470026,"score_gpt":0.35407651237894977,"score_spread":0.3150864180724797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2904275044","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95017743,0.00016438098,0.0080369795,0.0007857581,0.0000129968175,0.00012855382,0.000015679638,0.0000442371,0.04063387],"genre_scores_gemma":[0.99628973,0.00007262698,0.002539505,0.000029883982,0.0000039234633,0.000028355173,0.000013484496,0.0000060363072,0.0010164197],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.98541117,0.00933794,0.0004376479,0.0009444021,0.002287824,0.0015810262],"domain_scores_gemma":[0.9799959,0.0119751105,0.0030889104,0.0013874423,0.0013537974,0.0021988386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008533508,0.00034028233,0.0002255447,0.0013753198,0.002855263,0.0052523026,0.0010685537,0.0015592871,0.007763004],"category_scores_gemma":[0.019628432,0.0003741275,0.0004029019,0.0010456248,0.0030995435,0.0039234627,0.007580964,0.0008338618,0.00070718286],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000521599,0.0024531584,0.2596281,0.0009666188,0.0001509113,0.0049200784,0.25277346,0.0047685895,0.016519045,0.07514464,0.003646185,0.37850764],"study_design_scores_gemma":[0.00021991812,0.002858125,0.27643988,0.001111061,0.00020602485,0.0035886134,0.5054149,0.014464091,0.007720658,0.07881676,0.10897486,0.00018513082],"about_ca_topic_score_codex":0.001385852,"about_ca_topic_score_gemma":0.0031845055,"teacher_disagreement_score":0.008533508,"about_ca_system_score_codex":0.0018975196,"about_ca_system_score_gemma":0.003991863,"threshold_uncertainty_score":0.045130014},"labels":[],"label_agreement":null},{"id":"W2905036204","doi":"10.5267/j.msl.2018.11.011","title":"An evaluation of project management tools and techniques in Vietnam","year":2018,"lang":"en","type":"article","venue":"Management Science Letters","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Asia University","keywords":"Vietnamese; Project management; Project management triangle; Business; Data collection; Process management; OPM3; Knowledge management; Program management; Extreme project management; Engineering management; Computer science; Engineering; Systems engineering","score_opus":0.11502447514711399,"score_gpt":0.4159301539064483,"score_spread":0.30090567875933427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2905036204","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9826691,0.0008664777,0.0033450644,0.0003049142,0.00004221629,0.0010853901,0.0001378859,0.000052464766,0.011496554],"genre_scores_gemma":[0.98129004,0.00236934,0.012292919,0.00009080954,0.000015437523,0.0007159913,0.00021713947,0.000036999438,0.0029712769],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9811798,0.011848871,0.0014874348,0.0006410841,0.004072743,0.0007700798],"domain_scores_gemma":[0.9595238,0.020767933,0.0037575448,0.0014829884,0.011273646,0.0031940488],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01676406,0.0006462233,0.0005253522,0.0034862824,0.0015200856,0.0020865053,0.0010728156,0.0003622755,0.0017010131],"category_scores_gemma":[0.03657429,0.0003734476,0.00040330697,0.003678469,0.0010870456,0.0018907172,0.0020475658,0.0006788944,0.0002436653],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011439567,0.0053239604,0.072008744,0.0059955614,0.00019090723,0.0016307756,0.13845658,0.00206317,0.007942276,0.004063259,0.0040119505,0.75716895],"study_design_scores_gemma":[0.00062472164,0.03092152,0.4293791,0.0058230627,0.00044207604,0.0024620437,0.3597311,0.009931589,0.0143232765,0.0018972002,0.14415935,0.000304876],"about_ca_topic_score_codex":0.0077939103,"about_ca_topic_score_gemma":0.008484754,"teacher_disagreement_score":0.01676406,"about_ca_system_score_codex":0.003601573,"about_ca_system_score_gemma":0.0072241994,"threshold_uncertainty_score":0.088657856},"labels":[],"label_agreement":null},{"id":"W2905493383","doi":"10.1139/cjce-2018-0305","title":"Performance prediction of construction projects using soft computing methods","year":2018,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Performance indicator; Artificial neural network; Computer science; Analytic hierarchy process; Soft computing; Data mining; Adaptive neuro fuzzy inference system; Process (computing); Fuzzy logic; Cluster analysis; Performance prediction; Machine learning; Project management; Artificial intelligence; Engineering; Operations research; Systems engineering; Fuzzy control system; Simulation","score_opus":0.07908004908177056,"score_gpt":0.32922178649579215,"score_spread":0.25014173741402157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2905493383","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19817676,0.0002513136,0.79581404,0.00024326997,0.000040689552,0.00017770198,0.00026485953,0.0005987286,0.0044325977],"genre_scores_gemma":[0.90384936,0.00021236073,0.094634615,0.00001856251,0.000012053368,0.00016677272,0.00021218379,0.000022911676,0.0008711573],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991148,0.0002594266,0.000066616914,0.00010321894,0.0003898884,0.000065977256],"domain_scores_gemma":[0.9978098,0.0012378533,0.0003059147,0.00011419865,0.00047596026,0.0000563116],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00149512,0.0010614657,0.00071953365,0.002461611,0.00048048364,0.0014311151,0.00059482566,0.000691276,0.001166079],"category_scores_gemma":[0.00558563,0.00037133018,0.00072585954,0.0024459208,0.000414569,0.00087928865,0.0006525369,0.0007537521,0.00024436813],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003705587,0.000050718776,0.0038540352,0.00004576356,0.00002824864,0.000035146782,0.00004868106,0.9506509,0.00092618476,0.0013574823,0.000207763,0.042758062],"study_design_scores_gemma":[0.0000015754081,0.000013460684,0.00067639735,0.0000064273304,0.0000028754014,0.0000034891941,0.000015062319,0.9978728,0.0005025329,0.0008188406,0.00008229486,0.0000041128637],"about_ca_topic_score_codex":0.011749948,"about_ca_topic_score_gemma":0.0075256703,"teacher_disagreement_score":0.011749948,"about_ca_system_score_codex":0.0010984653,"about_ca_system_score_gemma":0.0013379724,"threshold_uncertainty_score":0.023363113},"labels":[],"label_agreement":null},{"id":"W2909127049","doi":"10.1108/ijmpb-08-2018-0167","title":"Investigating collective sensemaking of a major project success","year":2019,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure; HEC Montréal","funders":"","keywords":"Sensemaking; Originality; Procurement; Knowledge management; Project management; Project governance; Exploratory research; Sociology; Corporate governance; Public relations; Qualitative research; Business; Political science; Engineering; Computer science","score_opus":0.07492564804514208,"score_gpt":0.3777368587969202,"score_spread":0.30281121075177814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909127049","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9128265,0.0007397342,0.023211045,0.0049538217,0.00013340777,0.00035485407,0.00007373809,0.000086015505,0.057620864],"genre_scores_gemma":[0.99200904,0.00018901871,0.0029159056,0.00011265605,0.000017960003,0.00008734766,0.000032761935,0.000029121285,0.004606238],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9775425,0.014455533,0.0004208495,0.0018374039,0.0035622485,0.0021815207],"domain_scores_gemma":[0.9575534,0.023635872,0.0055487733,0.004367082,0.004929184,0.0039656884],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019797854,0.0009725745,0.0007185798,0.0037287804,0.017220393,0.013508306,0.0026989626,0.0020646977,0.003773251],"category_scores_gemma":[0.027440669,0.00043154036,0.00054914725,0.0029396901,0.03155775,0.005050024,0.0148181105,0.002677795,0.00029949812],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004266833,0.00004249027,0.0073133693,0.00017876211,0.00002379053,0.0016972095,0.94681,0.0003440306,0.001491248,0.021503113,0.0011978201,0.019355506],"study_design_scores_gemma":[0.00000387259,0.000046763806,0.0047840946,0.0001527366,0.000011871933,0.0004006015,0.957944,0.00037484456,0.00051160814,0.00464357,0.03110022,0.000025863654],"about_ca_topic_score_codex":0.044619247,"about_ca_topic_score_gemma":0.06812969,"teacher_disagreement_score":0.044619247,"about_ca_system_score_codex":0.012359983,"about_ca_system_score_gemma":0.013677701,"threshold_uncertainty_score":0.104702294},"labels":[],"label_agreement":null},{"id":"W2911895891","doi":"10.19255/jmpm441","title":"Projects as Dynamic, Multi-level temporary Organizations: Advantages of an Agent-Based Modeling Approach","year":2019,"lang":"en","type":"article","venue":"Journal of Modern Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Embeddedness; Computer science; Context (archaeology); Temporality; Perspective (graphical); Key (lock); Knowledge management; Process management; Management science; Business; Engineering; Artificial intelligence; Sociology","score_opus":0.11435355177833226,"score_gpt":0.3747088420802738,"score_spread":0.2603552903019415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2911895891","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025641525,0.0009069697,0.92565995,0.006353048,0.00010035885,0.00012395842,0.00020982251,0.00016952353,0.040834967],"genre_scores_gemma":[0.62620753,0.0020224336,0.3632946,0.00034581125,0.00013045371,0.0005157051,0.00020461534,0.00008112595,0.007197678],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986222,0.0008365108,0.00007444329,0.00015564085,0.00023147532,0.00007979168],"domain_scores_gemma":[0.9981772,0.0009576944,0.00023865319,0.00024100923,0.000150461,0.00023502292],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016128548,0.0004874734,0.00049961597,0.0013877301,0.001230537,0.005763265,0.0021061362,0.0016984481,0.0027350725],"category_scores_gemma":[0.0035653114,0.00051754125,0.00092004315,0.0016959598,0.0022949653,0.005842683,0.002850278,0.0017787201,0.0003816301],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011713913,0.000031730953,0.0016083433,0.000054093867,0.000028704006,0.00010132546,0.00077747594,0.109249495,0.00014450614,0.87701607,0.0009119006,0.010064583],"study_design_scores_gemma":[0.000018862322,0.000029313916,0.00090863,0.00010066675,0.00002723045,0.00011511458,0.0011463162,0.50203353,0.00008387337,0.46766737,0.027838279,0.000030853374],"about_ca_topic_score_codex":0.008756846,"about_ca_topic_score_gemma":0.013866236,"teacher_disagreement_score":0.008756846,"about_ca_system_score_codex":0.0020139222,"about_ca_system_score_gemma":0.002542065,"threshold_uncertainty_score":0.017411768},"labels":[],"label_agreement":null},{"id":"W2912317941","doi":"10.71781/3026","title":"The influence of sustainability in project management practices in the building sector","year":2017,"lang":"en","type":"dissertation","venue":"Papyrus : Institutional Repository (Université de Montréal)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Sustainability; Business; Environmental planning; Environmental resource management; Engineering; Architectural engineering; Geography; Environmental science; Ecology","score_opus":0.025616493845844183,"score_gpt":0.3000139850621627,"score_spread":0.2743974912163185,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2912317941","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9798978,0.00030270978,0.00071313715,0.00075840147,0.000008705791,0.000015417489,0.000023167204,0.0000067805613,0.018273817],"genre_scores_gemma":[0.99878794,0.000120437166,0.00013342257,0.000023038,0.0000036656284,0.00000513147,0.000005976717,0.0000029868297,0.0009174412],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9933323,0.004140945,0.00019352771,0.00036428365,0.001055127,0.00091387203],"domain_scores_gemma":[0.98404044,0.009277671,0.002989292,0.0004883579,0.0017805571,0.0014236795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003793895,0.00019179725,0.00019015877,0.00077359605,0.0010723119,0.003043305,0.00040935358,0.0004893566,0.0031164584],"category_scores_gemma":[0.013167997,0.00017320525,0.00027925643,0.0010478023,0.0020112281,0.0009812481,0.0022424678,0.00051867636,0.0003473081],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037855929,0.0004163787,0.77622354,0.0003372214,0.00017059343,0.0007979918,0.05352603,0.005496325,0.004551078,0.0205211,0.0011427708,0.13643844],"study_design_scores_gemma":[0.000007630233,0.0002817783,0.9438617,0.00016451601,0.000037589216,0.00013073487,0.040176675,0.0012627795,0.0009367098,0.0036784145,0.009435515,0.000025802532],"about_ca_topic_score_codex":0.0138970325,"about_ca_topic_score_gemma":0.03187041,"teacher_disagreement_score":0.98610294,"about_ca_system_score_codex":0.0034948045,"about_ca_system_score_gemma":0.004750571,"threshold_uncertainty_score":0.027632296},"labels":[],"label_agreement":null},{"id":"W2916867249","doi":"10.1016/j.tra.2019.02.004","title":"The cost performance of transportation projects: The fallacy of the Planning Fallacy account","year":2019,"lang":"en","type":"article","venue":"Transportation Research Part A Policy and Practice","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":76,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Wilfrid Laurier University; University of Ottawa","funders":"Australian Research Council","keywords":"Fallacy; Work (physics); Economics; Value (mathematics); Actuarial science; Business; Computer science; Engineering","score_opus":0.2319759634399578,"score_gpt":0.4871203454135044,"score_spread":0.2551443819735466,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2916867249","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22592893,0.014135596,0.21510838,0.29656044,0.002264692,0.00030336244,0.0016376629,0.00033006445,0.24373093],"genre_scores_gemma":[0.9840279,0.0017547578,0.005993759,0.0037232,0.00093141396,0.00009166174,0.00009857691,0.00011415727,0.0032645157],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9853489,0.006270364,0.0006531803,0.0015081443,0.005256484,0.0009629638],"domain_scores_gemma":[0.89293927,0.089455456,0.0062371274,0.0045520524,0.0054377043,0.0013784032],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016926374,0.0009650242,0.0024550427,0.0027992402,0.0017899198,0.0072904755,0.0023532487,0.005887939,0.007537957],"category_scores_gemma":[0.10570404,0.00088977773,0.0010600479,0.003543145,0.009694957,0.018297166,0.0034299626,0.010696805,0.0005455524],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025794635,0.0001379721,0.0073129702,0.00023586708,0.00014379705,0.00014973576,0.00042401068,0.026799386,0.00011621621,0.9109476,0.01382931,0.03964515],"study_design_scores_gemma":[0.00003167605,0.0000410224,0.0021468203,0.0001114407,0.000036064335,0.00004698883,0.00028794666,0.02011336,0.00010853224,0.97222203,0.004823763,0.000030315103],"about_ca_topic_score_codex":0.012339563,"about_ca_topic_score_gemma":0.009252785,"teacher_disagreement_score":0.016926374,"about_ca_system_score_codex":0.005840672,"about_ca_system_score_gemma":0.005897677,"threshold_uncertainty_score":0.08951634},"labels":[],"label_agreement":null},{"id":"W2918507475","doi":"10.1139/cjce-2018-0072","title":"A framework to assess the costs and benefits of advanced work packaging in industrial construction","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta; Canadian Natural Resources","funders":"Natural Sciences and Engineering Research Council of Canada; Canada Research Chairs","keywords":"Schedule; Work (physics); Process (computing); Productivity; Risk analysis (engineering); Cost–benefit analysis; Engineering; Computer science; Business","score_opus":0.05641648368988008,"score_gpt":0.28300736723693043,"score_spread":0.22659088354705034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2918507475","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.067945905,0.0045728837,0.76658565,0.0061063054,0.0001494946,0.0038928809,0.0022424576,0.00030936618,0.14819509],"genre_scores_gemma":[0.45159167,0.0028301573,0.5362169,0.0002958445,0.000058435377,0.003235984,0.0008845748,0.000052342333,0.0048341253],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98597705,0.007967387,0.0007253299,0.00080138753,0.0033217254,0.0012071189],"domain_scores_gemma":[0.9902339,0.0059951614,0.0014022351,0.0003771109,0.0015390174,0.0004525169],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012667191,0.0024667166,0.0010359436,0.013039377,0.002019902,0.008386748,0.0035994155,0.0039074803,0.006606168],"category_scores_gemma":[0.014273216,0.0008191882,0.002045468,0.009505083,0.005052864,0.006066115,0.0044649304,0.0023698886,0.0006552587],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005181507,0.0003815808,0.005813576,0.00055203034,0.00008264672,0.00023993549,0.0009253103,0.119632065,0.0005027751,0.8181532,0.0030962066,0.05056892],"study_design_scores_gemma":[0.00010742066,0.00088399375,0.017086245,0.0027990837,0.00016382318,0.0005964352,0.006104739,0.23834477,0.0012244069,0.67007214,0.062348023,0.00026882545],"about_ca_topic_score_codex":0.022459613,"about_ca_topic_score_gemma":0.023640273,"teacher_disagreement_score":0.022459613,"about_ca_system_score_codex":0.015498284,"about_ca_system_score_gemma":0.012069365,"threshold_uncertainty_score":0.112448394},"labels":[],"label_agreement":null},{"id":"W2920097760","doi":"10.1080/09537287.2019.1567859","title":"A dimensional analysis of stakeholder assessment of project outcomes","year":2019,"lang":"en","type":"article","venue":"Production Planning & Control","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":54,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University of Edmonton","funders":"","keywords":"Project stakeholder; Project sponsorship; Stakeholder; Stakeholder analysis; Project management; Project manager; Project management triangle; Project charter; Project planning; Stakeholder management; Project risk management; Process management; Business; Extreme project management; Project team; Project portfolio management; Work breakdown structure; OPM3; Knowledge management; Public relations; Engineering; Political science; Computer science; Systems engineering","score_opus":0.13051337674162175,"score_gpt":0.4151828211617665,"score_spread":0.28466944442014475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2920097760","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8929922,0.00026120842,0.07996055,0.0007349269,0.00002870328,0.0005805581,0.0010664308,0.00008029577,0.02429511],"genre_scores_gemma":[0.9807535,0.000075653006,0.018144077,0.000026130296,0.000008713676,0.00038243565,0.0003597579,0.000009692637,0.00023991925],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98588943,0.00912256,0.0013123795,0.00055562414,0.0027016457,0.00041832618],"domain_scores_gemma":[0.95360917,0.025068402,0.007870617,0.002327771,0.010353307,0.0007708044],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015745828,0.00046489103,0.00042048984,0.008549875,0.0011165742,0.0030045714,0.00041126902,0.00037857547,0.0017973619],"category_scores_gemma":[0.046839803,0.00021799769,0.000787278,0.005698005,0.0012726524,0.0034164153,0.0026595008,0.00061047595,0.0001990172],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005985604,0.0003666363,0.6077995,0.0010139892,0.00047080216,0.00036504463,0.05294481,0.011016619,0.0059921867,0.053904366,0.0029285077,0.26259902],"study_design_scores_gemma":[0.00005200016,0.00088934466,0.7256818,0.000645587,0.00016071953,0.0006102917,0.12347289,0.05846808,0.0036907617,0.06635887,0.019639159,0.0003304926],"about_ca_topic_score_codex":0.0018191672,"about_ca_topic_score_gemma":0.002126971,"teacher_disagreement_score":0.015745828,"about_ca_system_score_codex":0.0019233841,"about_ca_system_score_gemma":0.0011722395,"threshold_uncertainty_score":0.083272934},"labels":[],"label_agreement":null},{"id":"W2920101322","doi":"10.1109/tem.2019.2895732","title":"Matching the Project Manager's Roles to Project Types: Evidence From Large Dam Projects in Africa","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Engineering Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Pace; sort; Novelty; Project manager; Matching (statistics); Project management; Computer science; Knowledge management; Process management; Variety (cybernetics); Business; Management; Geography; Economics; Psychology","score_opus":0.05739274579626905,"score_gpt":0.30928734040447636,"score_spread":0.2518945946082073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2920101322","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99610186,0.0004075235,0.0006384423,0.0005090591,0.0000060859265,0.000032983367,0.000025503568,0.0000014923609,0.002277207],"genre_scores_gemma":[0.99880946,0.00045892195,0.00033217808,0.000085978674,0.0000031143877,0.000035659454,0.000010718658,0.0000028878276,0.0002610585],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.989881,0.0065556387,0.0005680427,0.0007602106,0.001159656,0.0010754808],"domain_scores_gemma":[0.93849444,0.042888407,0.012624221,0.0010610651,0.0030318508,0.0018999163],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010724654,0.00033094117,0.00033179478,0.0021948353,0.0034000925,0.0026115743,0.0009886624,0.00078620476,0.0023918482],"category_scores_gemma":[0.056495316,0.00074504316,0.00015373703,0.0027263954,0.0037032324,0.0036562872,0.0036200322,0.0009904768,0.00019798928],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015820525,0.00013898409,0.23462276,0.00066216436,0.000027867683,0.001540702,0.722986,0.00012932239,0.0011336775,0.002724764,0.0009040009,0.034971576],"study_design_scores_gemma":[0.000010677377,0.00009720579,0.15370047,0.0005171872,0.000017736556,0.00046556015,0.8376868,0.00021100289,0.0003319592,0.00042069683,0.006519939,0.00002070207],"about_ca_topic_score_codex":0.0099155,"about_ca_topic_score_gemma":0.022560287,"teacher_disagreement_score":0.010724654,"about_ca_system_score_codex":0.002373971,"about_ca_system_score_gemma":0.0032137241,"threshold_uncertainty_score":0.05671805},"labels":[],"label_agreement":null},{"id":"W2922284585","doi":"10.14488/bjopm.2019.v16.n1.a6","title":"A contemporary vision of project success criteria","year":2019,"lang":"en","type":"article","venue":"Brazilian Journal of Operations & Production Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Originality; Ranking (information retrieval); Project management; Identification (biology); Scale (ratio); Management science; Sample (material); Success factors; Value (mathematics); Diversity (politics); Knowledge management; Engineering; Process management; Computer science; Business; Qualitative research; Political science; Sociology; Geography; Systems engineering","score_opus":0.06601797965212218,"score_gpt":0.3975291867565739,"score_spread":0.3315112071044517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2922284585","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07250752,0.05971637,0.52431357,0.06416479,0.0020541481,0.00068337604,0.00042743233,0.00045413236,0.2756786],"genre_scores_gemma":[0.8268124,0.018045386,0.14599347,0.0017071383,0.0007603115,0.00094942097,0.00035143923,0.00022422528,0.005156237],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9448311,0.029296434,0.0044662287,0.0031882282,0.01649297,0.001725056],"domain_scores_gemma":[0.92332095,0.033925354,0.0069217733,0.006291225,0.025212126,0.004328597],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.044917315,0.0021546418,0.0013174477,0.017962506,0.0044089514,0.017938972,0.0035016928,0.0031337214,0.0030152032],"category_scores_gemma":[0.0571887,0.00058808835,0.0009780728,0.014470289,0.030332891,0.018709118,0.008614139,0.0049845376,0.0008357681],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028686874,0.00008802923,0.0043463944,0.0010695516,0.000033925407,0.00013533188,0.012919298,0.0013315747,0.00047230246,0.8463994,0.0045904103,0.1285851],"study_design_scores_gemma":[0.000024118182,0.00033147124,0.011737155,0.0055607897,0.00008042561,0.0008371579,0.04678927,0.0058388254,0.00091196457,0.6524443,0.27528858,0.00015590689],"about_ca_topic_score_codex":0.005695175,"about_ca_topic_score_gemma":0.002892304,"teacher_disagreement_score":0.044917315,"about_ca_system_score_codex":0.011233173,"about_ca_system_score_gemma":0.01634712,"threshold_uncertainty_score":0.23754829},"labels":[],"label_agreement":null},{"id":"W2922424781","doi":"10.1108/ijmpb-03-2018-0037","title":"Exploring project managers’ accountability","year":2019,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Accountability; Corporate governance; Conceptualization; Business; Public relations; Process management; Political science; Computer science","score_opus":0.28080018503942666,"score_gpt":0.40202665693209616,"score_spread":0.1212264718926695,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2922424781","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77412593,0.0019190445,0.075919926,0.039753716,0.00056101556,0.00030400825,0.000059585163,0.00029069764,0.1070661],"genre_scores_gemma":[0.9937962,0.00030677824,0.0029683972,0.0007748399,0.000042843356,0.00010843489,0.000013014153,0.00002452154,0.0019649214],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9131491,0.07120062,0.0018770678,0.002422229,0.007507205,0.0038437033],"domain_scores_gemma":[0.9047517,0.059079554,0.013748721,0.0035312364,0.012132081,0.0067568137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.04067379,0.0005081536,0.00029517346,0.0024569049,0.0069583105,0.009515809,0.0014549909,0.00166605,0.0023138577],"category_scores_gemma":[0.09866986,0.0005071012,0.00038138698,0.0014964581,0.01086835,0.0077343415,0.0073277405,0.003927294,0.00039287048],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056684697,0.00012927505,0.029410427,0.00030205082,0.000046205092,0.00064958225,0.8074182,0.00076894666,0.0016529511,0.07794327,0.008110213,0.07351213],"study_design_scores_gemma":[0.000039427,0.00030641907,0.017853014,0.00065577135,0.000039018087,0.00074665016,0.7188952,0.0035354963,0.0013836458,0.048507746,0.20793027,0.00010733111],"about_ca_topic_score_codex":0.0021340724,"about_ca_topic_score_gemma":0.0015647156,"teacher_disagreement_score":0.04067379,"about_ca_system_score_codex":0.007172354,"about_ca_system_score_gemma":0.009910089,"threshold_uncertainty_score":0.21510613},"labels":[],"label_agreement":null},{"id":"W2925783402","doi":"","title":"Project Risk and Opportunity Management: The Owner's Perspective","year":2019,"lang":"en","type":"book","venue":"CERN Document Server (European Organization for Nuclear Research)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Perspective (graphical); Risk management; Engineering; Set (abstract data type); Project management; Resource (disambiguation); Project management triangle; Project risk management; Risk analysis (engineering); Key (lock); Engineering management; Business; Operations management; Computer science; Computer security; Finance; Systems engineering","score_opus":0.08487834662373024,"score_gpt":0.34078384878727813,"score_spread":0.2559055021635479,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2925783402","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013519067,0.054179616,0.031708736,0.10050203,0.0028568204,0.00008619917,0.00011784626,0.00012081292,0.7969089],"genre_scores_gemma":[0.4586822,0.0918548,0.01577352,0.015706455,0.003484259,0.00024487916,0.0001340461,0.00023159127,0.41388828],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9966059,0.0017681406,0.0000757491,0.00017122383,0.0011135039,0.00026546005],"domain_scores_gemma":[0.9974371,0.0014422293,0.00017960115,0.00011288609,0.00045168048,0.00037648372],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024321158,0.00063457165,0.0005603432,0.0010344894,0.002668822,0.011954574,0.001149818,0.002949884,0.00809099],"category_scores_gemma":[0.0043940735,0.00041422038,0.00033827647,0.0013641502,0.0063968315,0.0100403335,0.0040325657,0.0046965554,0.002089281],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015492507,0.00006693819,0.00045709376,0.00025755624,0.0000071132413,0.00044804096,0.0075384406,0.0014075994,0.00015004222,0.80423045,0.117041506,0.06837973],"study_design_scores_gemma":[0.0000049089376,0.00006376038,0.0004622017,0.0006856872,0.000007820005,0.00085406913,0.010429294,0.0013555331,0.00014160329,0.14815953,0.83781093,0.000024595724],"about_ca_topic_score_codex":0.0020465653,"about_ca_topic_score_gemma":0.0023530493,"teacher_disagreement_score":0.011954574,"about_ca_system_score_codex":0.0024663084,"about_ca_system_score_gemma":0.0033757894,"threshold_uncertainty_score":0.027067125},"labels":[],"label_agreement":null},{"id":"W2929589072","doi":"10.3390/laws8020009","title":"Comparison of Quebec’s Project Delivery Methods: Relational Contract Law and Differences in Contractual Language","year":2019,"lang":"en","type":"article","venue":"Laws","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Integrated project delivery; Sustainability; Construction contract; Business; Process (computing); Contract management; Multitude; Public relations; Process management; Construction management; Knowledge management; Computer science; Law; Marketing; Management; Economics; Political science","score_opus":0.12556582098793048,"score_gpt":0.43833874860996475,"score_spread":0.31277292762203424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2929589072","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6974388,0.0026699768,0.01993346,0.010079247,0.00012265424,0.0010794763,0.0012533864,0.00015750827,0.2672656],"genre_scores_gemma":[0.9854196,0.00035094802,0.0037445757,0.00038422787,0.000004521759,0.00028910156,0.00019590976,0.000030201214,0.009581058],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9857415,0.0050979387,0.0006005714,0.00078757876,0.005880273,0.0018921414],"domain_scores_gemma":[0.9704508,0.013733283,0.001983251,0.0015665179,0.010262076,0.0020040146],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0131726,0.0002554062,0.0002760668,0.0025923206,0.009055274,0.0070724934,0.0018936745,0.0008436104,0.005644734],"category_scores_gemma":[0.032362543,0.000391384,0.00028229473,0.0057824007,0.0063566603,0.0025529468,0.0021933382,0.0013197906,0.00020746788],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035483847,0.00034186436,0.119554244,0.00060270267,0.00010743388,0.0009614055,0.25939107,0.004460506,0.0031481031,0.35466614,0.02249587,0.23391585],"study_design_scores_gemma":[0.00013332976,0.0002103913,0.3991879,0.0012555111,0.00006815125,0.00038355208,0.30795586,0.01080978,0.001654866,0.010285704,0.26782754,0.00022733584],"about_ca_topic_score_codex":0.9792879,"about_ca_topic_score_gemma":0.98849547,"teacher_disagreement_score":0.12842353,"about_ca_system_score_codex":0.12842353,"about_ca_system_score_gemma":0.11797745,"threshold_uncertainty_score":0.93178225},"labels":[],"label_agreement":null},{"id":"W2934447642","doi":"10.3846/jcem.2019.9644","title":"SORTING SUBCONTRACTORS’ ACTIVITIES IN CONSTRUCTION PROJECTS WITH A NOVEL ADDITIVE-VETO SORTING APPROACH","year":2019,"lang":"en","type":"article","venue":"Journal of Civil Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Conselho Nacional de Desenvolvimento Científico e Tecnológico","keywords":"Veto; Bidding; Sorting; sort; Class (philosophy); Process (computing); Selection (genetic algorithm); Decision maker; Purchasing; Rationality; Computer science; Operations research; Risk analysis (engineering); Novelty; Engineering; Business; Operations management; Artificial intelligence; Marketing","score_opus":0.02516845664747961,"score_gpt":0.2571910426485347,"score_spread":0.2320225860010551,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2934447642","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.072681546,0.00011554239,0.92089635,0.00024667973,0.000040218925,0.00029735226,0.00008243539,0.00019311068,0.005446748],"genre_scores_gemma":[0.66634053,0.000113854476,0.3284577,0.00009528296,0.00002191949,0.0002811876,0.00014856704,0.000045633373,0.0044953795],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9954418,0.0019227371,0.0002993035,0.0007475701,0.0010695435,0.0005190917],"domain_scores_gemma":[0.9965306,0.0018456916,0.00045535484,0.00040048495,0.0005412952,0.00022660245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035607035,0.0008471645,0.001165465,0.0022452017,0.0011858614,0.0029534386,0.0021277019,0.0016110559,0.003671246],"category_scores_gemma":[0.00592632,0.00073411304,0.0015214976,0.0022876204,0.001311957,0.002466469,0.0022741475,0.0012137677,0.00038585626],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006520889,0.0008543624,0.011996932,0.00043909447,0.0002623779,0.0003445705,0.0021484885,0.4605926,0.009061017,0.11387443,0.001728964,0.39804506],"study_design_scores_gemma":[0.000045710032,0.00025397915,0.0023538284,0.00003786937,0.000073061776,0.00011880638,0.00069184916,0.9509327,0.0024078402,0.039885804,0.003130821,0.000067805806],"about_ca_topic_score_codex":0.006456824,"about_ca_topic_score_gemma":0.008430283,"teacher_disagreement_score":0.006456824,"about_ca_system_score_codex":0.002193162,"about_ca_system_score_gemma":0.0028487039,"threshold_uncertainty_score":0.018831015},"labels":[],"label_agreement":null},{"id":"W2937220994","doi":"10.29173/mocs18","title":"Modelling the Construction On-Site Technology Adoption Process","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Process (computing); Business; Exhibition; Information technology; Innovation diffusion; Engineering; Marketing; Computer science; Economics; Economic growth; Geography","score_opus":0.039397798217038524,"score_gpt":0.2882239834770909,"score_spread":0.24882618526005235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937220994","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79919493,0.00058126886,0.16257831,0.002378856,0.000056929668,0.00055326545,0.0011520352,0.00022219658,0.033282157],"genre_scores_gemma":[0.96782315,0.0005381691,0.018226516,0.000069345646,0.000017434135,0.00039076182,0.0004177476,0.0000444634,0.012472419],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983341,0.00083429,0.0000781944,0.00022738827,0.00016686403,0.00035918038],"domain_scores_gemma":[0.98731893,0.01000688,0.0012525647,0.00030471824,0.00061745895,0.0004994799],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038105838,0.0010520848,0.00074921903,0.0016724007,0.00076472946,0.0037102588,0.0016992012,0.003909808,0.01074345],"category_scores_gemma":[0.012782254,0.0009426653,0.0012521639,0.0023897965,0.0011298126,0.00311151,0.0019277115,0.0022789096,0.001631169],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024169509,0.00058061973,0.026631799,0.00020873245,0.0000772048,0.00073007285,0.002463371,0.87612265,0.0011440984,0.07115664,0.0011033494,0.019539818],"study_design_scores_gemma":[0.0000455659,0.00012255272,0.0031797069,0.00003344056,0.000029352548,0.00007546418,0.0008046089,0.9821046,0.00017967004,0.011602407,0.0017949264,0.000027657708],"about_ca_topic_score_codex":0.0362647,"about_ca_topic_score_gemma":0.022808949,"teacher_disagreement_score":0.0362647,"about_ca_system_score_codex":0.0038217106,"about_ca_system_score_gemma":0.0028192287,"threshold_uncertainty_score":0.072107196},"labels":[],"label_agreement":null},{"id":"W2938646736","doi":"10.29173/mocs13","title":"Measuring the Sustainable Benefits of Modular and Offsite Construction Delivery Techniques Against Conventional On-Site Construction","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Nuclear decommissioning; Integrated project delivery; Procurement; Sustainability; Engineering; Risk analysis (engineering); Modular design; Construction engineering; Construction management; Environmental economics; Business; Civil engineering; Computer science; Waste management","score_opus":0.032048090056403036,"score_gpt":0.2495497643575795,"score_spread":0.21750167430117645,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938646736","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9458406,0.00049079105,0.016510095,0.00017088535,0.000023612953,0.00027326576,0.0005067383,0.00006960535,0.036114603],"genre_scores_gemma":[0.97966695,0.0004152728,0.016585656,0.000038406983,0.0000060434163,0.0001097832,0.00040800884,0.000024353785,0.0027454898],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9942796,0.0012133324,0.00014260308,0.0002357904,0.0038079077,0.00032071132],"domain_scores_gemma":[0.99543935,0.0014088686,0.0008130483,0.0003038422,0.0018152982,0.00021957306],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045125787,0.00057700375,0.00032765896,0.0034597258,0.00045950932,0.0018231388,0.0005844304,0.000510034,0.0018125165],"category_scores_gemma":[0.006159057,0.0001422383,0.00069403125,0.003204947,0.0009688658,0.0015372977,0.0018705681,0.00052311935,0.00026579836],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010454528,0.0014781512,0.35457233,0.0013111521,0.00056476175,0.00031960817,0.002408352,0.12967443,0.042191066,0.020576656,0.0031087962,0.44274926],"study_design_scores_gemma":[0.00006648427,0.0068189697,0.78107935,0.0005991676,0.00046873823,0.0004062267,0.011860447,0.12273789,0.041925155,0.0100882035,0.02371412,0.00023528608],"about_ca_topic_score_codex":0.028558284,"about_ca_topic_score_gemma":0.08837544,"teacher_disagreement_score":0.028558284,"about_ca_system_score_codex":0.004366727,"about_ca_system_score_gemma":0.0031076253,"threshold_uncertainty_score":0.056784093},"labels":[],"label_agreement":null},{"id":"W2945098624","doi":"10.1177/8756972819847876","title":"Modeling Organizational Project Management","year":2019,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":98,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"OPM3; Project portfolio management; Project management; Knowledge management; Corporate governance; Business; Process management; Project management triangle; Project stakeholder; Program management; Extreme project management; Computer science; Engineering; Systems engineering","score_opus":0.07131816661206597,"score_gpt":0.35533525131719285,"score_spread":0.2840170847051269,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2945098624","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.108985476,0.0009828197,0.7581632,0.0034484859,0.0001519884,0.00036042053,0.00094453903,0.00036898736,0.12659411],"genre_scores_gemma":[0.7308574,0.0014938258,0.23922239,0.00014799909,0.00010338941,0.0012808065,0.0011465893,0.00012045673,0.025627118],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9987663,0.0006490612,0.00005677148,0.00016410823,0.00021306786,0.0001506459],"domain_scores_gemma":[0.99728465,0.0016651585,0.0003132048,0.00023721276,0.00029863275,0.000201057],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019692266,0.000602765,0.00045752502,0.0012974599,0.0011122343,0.0031796817,0.0020505113,0.0017672571,0.005722452],"category_scores_gemma":[0.0054910085,0.0005314035,0.0008491267,0.0018493086,0.001361101,0.002162113,0.0018057592,0.0012423646,0.00073628715],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013322841,0.00006886182,0.0017860938,0.00007178793,0.000033470435,0.00009030996,0.00061899057,0.54362047,0.00023629966,0.44266263,0.0011920983,0.009605666],"study_design_scores_gemma":[0.000018775227,0.000028413435,0.0003644956,0.000029134659,0.00001200319,0.000035832243,0.00027113853,0.86535156,0.000087832595,0.12178577,0.012004182,0.000010825009],"about_ca_topic_score_codex":0.014687622,"about_ca_topic_score_gemma":0.013110452,"teacher_disagreement_score":0.014687622,"about_ca_system_score_codex":0.0027476077,"about_ca_system_score_gemma":0.0033593313,"threshold_uncertainty_score":0.02920425},"labels":[],"label_agreement":null},{"id":"W2945560829","doi":"10.1108/ijmpb-03-2019-216","title":"The (enlightened) perspective of an anthropologist on entrepreneurship and the project","year":2019,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Perspective (graphical); Entrepreneurship; Sociology; Epistemology; Engineering ethics; Anthropology; Political science; Philosophy; Engineering; Computer science; Law; Artificial intelligence","score_opus":0.0553882027608479,"score_gpt":0.38826121274740283,"score_spread":0.33287300998655495,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2945560829","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048330236,0.022421557,0.02097601,0.59866756,0.008089718,0.00011473403,0.00011328255,0.00006219252,0.3012248],"genre_scores_gemma":[0.75252265,0.017184356,0.008888522,0.10071066,0.0066686305,0.00022656091,0.00006996503,0.00018309007,0.113545634],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9945792,0.0042137573,0.000107972264,0.00026125912,0.00035656124,0.0004812239],"domain_scores_gemma":[0.9940341,0.004349198,0.00025997346,0.00022798756,0.00039629333,0.0007325162],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008133932,0.00086993707,0.00054825394,0.0021877736,0.009503368,0.013495547,0.0017411561,0.0067890063,0.0066101747],"category_scores_gemma":[0.008676051,0.000400962,0.0003534588,0.0014340845,0.03771918,0.018929236,0.0071831737,0.014389306,0.0007110925],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023568404,0.00007173087,0.0004461821,0.00013298377,0.000006788354,0.0010228831,0.16074042,0.00020929622,0.00024639472,0.7889796,0.038352337,0.009767701],"study_design_scores_gemma":[0.000010083782,0.000037144255,0.00038539636,0.00045464176,0.00000600773,0.00081311725,0.1278159,0.0002530822,0.00018161691,0.17401043,0.69600743,0.000025162966],"about_ca_topic_score_codex":0.0023741291,"about_ca_topic_score_gemma":0.0034598492,"teacher_disagreement_score":0.013495547,"about_ca_system_score_codex":0.0024616132,"about_ca_system_score_gemma":0.0024222464,"threshold_uncertainty_score":0.04301685},"labels":[],"label_agreement":null},{"id":"W2946943404","doi":"10.1061/(asce)co.1943-7862.0001670","title":"Novel Approach to Overcoming Discontinuity in Knowledge: Application in Value-Adding Frameworks in Construction Industry","year":2019,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Discontinuity (linguistics); Obstacle; Construction industry; Value (mathematics); Computer science; Field (mathematics); Realization (probability); Knowledge management; Management science; Industrial engineering; Engineering; Construction engineering; Mathematics; Machine learning","score_opus":0.020071105534090247,"score_gpt":0.2954097991528322,"score_spread":0.27533869361874197,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2946943404","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.056698523,0.0016819995,0.86915046,0.010233991,0.00025012545,0.00044427198,0.00006993623,0.00024500448,0.061225675],"genre_scores_gemma":[0.534546,0.00090901187,0.4600758,0.00040540824,0.000088010434,0.00026850076,0.000051066785,0.000033909666,0.0036222],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99467754,0.0029498872,0.00033166664,0.0006036528,0.001147752,0.00028941833],"domain_scores_gemma":[0.99191767,0.004853923,0.00073353684,0.0010881083,0.0010419419,0.00036485473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007979128,0.0006048293,0.000666791,0.004021607,0.0028435197,0.0066144275,0.0022557932,0.0029175016,0.004044576],"category_scores_gemma":[0.0127922045,0.00035956042,0.001262063,0.003587865,0.010128174,0.00969688,0.00841396,0.0029199326,0.00030221295],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030015892,0.00015813441,0.00119593,0.00027648074,0.0000289383,0.00030385487,0.0071307197,0.0031990826,0.0009817736,0.9077157,0.0009356256,0.07804381],"study_design_scores_gemma":[0.000064266256,0.00018739693,0.0019620282,0.0005922883,0.00008063278,0.0008048309,0.012513442,0.054759227,0.002917779,0.8680586,0.05798275,0.00007660881],"about_ca_topic_score_codex":0.0030073668,"about_ca_topic_score_gemma":0.0040015075,"teacher_disagreement_score":0.007979128,"about_ca_system_score_codex":0.0038589123,"about_ca_system_score_gemma":0.0048594945,"threshold_uncertainty_score":0.04219812},"labels":[],"label_agreement":null},{"id":"W2948079457","doi":"10.1139/cjce-2018-0795","title":"Construction project proposal evaluation under uncertainty: A fuzzy-based approach","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Fuzzy logic; Computer science; Uncertainty analysis; Transparency (behavior); Operations research; Data mining; Management science; Mathematics; Artificial intelligence; Engineering; Simulation","score_opus":0.0508667074466707,"score_gpt":0.29615510975237386,"score_spread":0.24528840230570315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2948079457","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019121263,0.00036357832,0.97225755,0.0003999596,0.00003573254,0.00027333267,0.00008323441,0.000077199504,0.0073881443],"genre_scores_gemma":[0.5123921,0.0006189543,0.48451623,0.000087277265,0.000070312206,0.00041263856,0.0001174361,0.000023044364,0.0017620667],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9919132,0.0037917,0.00058843964,0.00065119955,0.0026956769,0.00035988333],"domain_scores_gemma":[0.9917326,0.005195499,0.00072097825,0.00025404454,0.0018831309,0.00021371244],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0106861275,0.0010544976,0.0012697822,0.0073159914,0.0017213746,0.0046866667,0.0023686385,0.0015729766,0.0021488266],"category_scores_gemma":[0.01495883,0.0006134903,0.0017283545,0.0040564737,0.0021602416,0.003632121,0.0021154003,0.0012889242,0.00021675807],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018142769,0.00023288646,0.003804067,0.0007043778,0.00026045358,0.0008562881,0.001998823,0.62623435,0.0047955466,0.16936153,0.0018007874,0.18976937],"study_design_scores_gemma":[0.00002504143,0.00010061954,0.0010024023,0.0001986274,0.000089063156,0.00016119782,0.00068533706,0.9078256,0.0016634549,0.08522822,0.0029459202,0.000074501826],"about_ca_topic_score_codex":0.009178234,"about_ca_topic_score_gemma":0.008795593,"teacher_disagreement_score":0.0106861275,"about_ca_system_score_codex":0.0048181023,"about_ca_system_score_gemma":0.0036706093,"threshold_uncertainty_score":0.056514323},"labels":[],"label_agreement":null},{"id":"W2949447065","doi":"10.19255/jmpm01911","title":"Exploring the Context of Price Quotation on Design Projects","year":2019,"lang":"en","type":"article","venue":"Journal of Modern Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Robustness (evolution); Assertiveness; Context (archaeology); Marketing; Process (computing); Inclusion (mineral); Computer science; Business; Process management; Psychology; Social psychology; Geography","score_opus":0.2915231225112637,"score_gpt":0.358105468902544,"score_spread":0.0665823463912803,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2949447065","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88556814,0.00079039787,0.05138561,0.0051539387,0.00026682203,0.00048715837,0.00011555602,0.00015425796,0.056078136],"genre_scores_gemma":[0.98889166,0.00025427042,0.008527555,0.00014886443,0.00006378738,0.00012634636,0.000034064018,0.00006946118,0.0018839571],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.8885621,0.095608525,0.0030219432,0.0017014975,0.008736472,0.0023694825],"domain_scores_gemma":[0.74289554,0.22045884,0.0149545185,0.0069212425,0.01190244,0.0028673871],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.038729697,0.0006733352,0.00056193356,0.0044210157,0.008127707,0.009601858,0.0016173118,0.0028186603,0.0043761763],"category_scores_gemma":[0.16411848,0.00093064684,0.00034460277,0.0045461417,0.011139075,0.008726547,0.008782172,0.003214887,0.00061122264],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026010905,0.00016331117,0.008379337,0.0007006815,0.000020185524,0.0029295904,0.8779675,0.0008582212,0.0064096022,0.030935016,0.0013601284,0.07001641],"study_design_scores_gemma":[0.000037986152,0.00040045264,0.028667774,0.001575086,0.000033097498,0.0021551931,0.83674383,0.0055409675,0.007516071,0.029511327,0.08763469,0.00018352312],"about_ca_topic_score_codex":0.0013596882,"about_ca_topic_score_gemma":0.0023346262,"teacher_disagreement_score":0.038729697,"about_ca_system_score_codex":0.004975079,"about_ca_system_score_gemma":0.0043919943,"threshold_uncertainty_score":0.20482469},"labels":[],"label_agreement":null},{"id":"W2950195020","doi":"10.1108/ijmpb-12-2018-0284","title":"Mediated effect of project management asset characteristics on firm performance","year":2019,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; Athabasca University","funders":"","keywords":"Project management; Business; Project management triangle; Originality; Competitive advantage; Sample (material); Asset (computer security); OPM3; Resource-based view; Project portfolio management; Knowledge management; Process management; Marketing; Computer science; Economics; Management; Creativity","score_opus":0.036832648766833495,"score_gpt":0.34859511169850216,"score_spread":0.31176246293166865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2950195020","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9932673,0.00011266241,0.0016718073,0.00018430692,0.000010485033,0.00006937998,0.00019176296,0.000022989716,0.0044692247],"genre_scores_gemma":[0.99851817,0.000056928464,0.0006292732,0.000030274356,0.00000866453,0.00005248954,0.000112892536,0.000005736377,0.0005855115],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9903779,0.005658938,0.0004204668,0.001104539,0.0015254178,0.00091280555],"domain_scores_gemma":[0.91316235,0.056679394,0.01663279,0.004980454,0.004031226,0.004513778],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005032872,0.00082370045,0.00066607585,0.0013800142,0.0006785211,0.0026313774,0.00073471223,0.00059656583,0.010322217],"category_scores_gemma":[0.035576377,0.00032569843,0.0006109084,0.0013949018,0.001118559,0.0013015338,0.0029945623,0.0013229129,0.0008226568],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022838096,0.0010056259,0.9694499,0.000103272796,0.0004345085,0.00017554365,0.0007581732,0.0013217594,0.00083678856,0.0015263218,0.00023908407,0.023920614],"study_design_scores_gemma":[0.000016431848,0.0006157124,0.99359256,0.0000686882,0.00013921974,0.00007032856,0.0010284735,0.001870041,0.00084373634,0.0011695622,0.0005656367,0.000019545785],"about_ca_topic_score_codex":0.003213031,"about_ca_topic_score_gemma":0.002161208,"teacher_disagreement_score":0.010322217,"about_ca_system_score_codex":0.0009481049,"about_ca_system_score_gemma":0.0021071837,"threshold_uncertainty_score":0.034531236},"labels":[],"label_agreement":null},{"id":"W2950217926","doi":"10.19255/jmpm01902","title":"Dimensions and requirements of collaborative planning in business transformation projects","year":2019,"lang":"en","type":"article","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Process management; Dimension (graph theory); Environmental design and planning; Project planning; Process (computing); Project management; Business; Computer science; Knowledge management; Engineering; Systems engineering; Land-use planning","score_opus":0.03830337465686514,"score_gpt":0.31205712779984446,"score_spread":0.27375375314297934,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2950217926","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31566626,0.0018585578,0.21736497,0.02911466,0.00017455015,0.0020706737,0.00036608588,0.00023917569,0.43314517],"genre_scores_gemma":[0.92750037,0.0006377446,0.068496495,0.00019558852,0.000025181394,0.0009196857,0.0001495596,0.00003407822,0.0020412772],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.932681,0.04127158,0.0044410694,0.0017859768,0.016818663,0.0030017358],"domain_scores_gemma":[0.91061896,0.064045645,0.007174593,0.004284513,0.009324856,0.004551538],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.028244961,0.00042646512,0.0005045831,0.0017576689,0.0063324557,0.010475505,0.0018238991,0.002313326,0.0027692441],"category_scores_gemma":[0.060984384,0.00060621754,0.0005274369,0.0030827438,0.009320138,0.0066903126,0.0073422114,0.0028421164,0.00040043524],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013556292,0.00026851188,0.018412314,0.0011820034,0.000046070916,0.0016849862,0.075435266,0.019558491,0.0019287498,0.74832994,0.0060801287,0.126938],"study_design_scores_gemma":[0.00009328173,0.0003714334,0.029713597,0.0020308036,0.000069135574,0.0042440738,0.2332815,0.031518806,0.0036090952,0.49596682,0.19885997,0.00024152928],"about_ca_topic_score_codex":0.0068586604,"about_ca_topic_score_gemma":0.007500227,"teacher_disagreement_score":0.028244961,"about_ca_system_score_codex":0.0065498156,"about_ca_system_score_gemma":0.014738727,"threshold_uncertainty_score":0.14937538},"labels":[],"label_agreement":null},{"id":"W2952170803","doi":"","title":"The Temporal Nature of Project Leadership: An Empirical Investigation","year":2009,"lang":"en","type":"article","venue":"Bond University Research Portal (Bond University)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Political science; Public relations; Epistemology; Philosophy","score_opus":0.26679729981529865,"score_gpt":0.41401414975296036,"score_spread":0.1472168499376617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2952170803","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97352594,0.00040703136,0.008256566,0.00039271193,0.000023192655,0.00022754405,0.0001973377,0.000019333478,0.016950384],"genre_scores_gemma":[0.9970029,0.0001649376,0.0016246786,0.000036354195,0.000013095164,0.00017896587,0.00013476741,0.000012510958,0.00083173654],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9956566,0.0023140733,0.00038057537,0.00030174025,0.0010991548,0.0002478984],"domain_scores_gemma":[0.8342655,0.12427585,0.024539394,0.005026782,0.008395694,0.003496792],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013851105,0.00013689125,0.00025103643,0.0020521942,0.0012876262,0.0026649018,0.0010195543,0.0006275085,0.0075316313],"category_scores_gemma":[0.1118258,0.0004768455,0.00025949648,0.002714358,0.0010758261,0.0037064713,0.0018260516,0.0010830887,0.000652536],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018624573,0.0014399161,0.8765263,0.000424833,0.00010397298,0.0007261839,0.033578407,0.0009248844,0.002611552,0.02828771,0.0007548767,0.05275898],"study_design_scores_gemma":[0.00013690043,0.0012525849,0.91559106,0.00034508575,0.000119389704,0.0013838498,0.05006631,0.009816988,0.0012789452,0.012225641,0.007720946,0.000062331615],"about_ca_topic_score_codex":0.0023230708,"about_ca_topic_score_gemma":0.005133824,"teacher_disagreement_score":0.013851105,"about_ca_system_score_codex":0.00093099434,"about_ca_system_score_gemma":0.0019668401,"threshold_uncertainty_score":0.0732525},"labels":[],"label_agreement":null},{"id":"W2952656983","doi":"10.5430/ijfr.v10n5p262","title":"Study on the Development Strategy of Ant Financial","year":2019,"lang":"en","type":"article","venue":"International Journal of Financial Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"The Internet; SWOT analysis; Business; China; Finance; Convergence (economics); Process (computing); Financial services; Marketing; Economics; Computer science; Economic growth; World Wide Web","score_opus":0.3643369100179539,"score_gpt":0.5191921242016332,"score_spread":0.1548552141836793,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2952656983","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84566253,0.00072042097,0.008372964,0.002900915,0.00003325016,0.00024406519,0.000077296405,0.000045078683,0.14194347],"genre_scores_gemma":[0.9880834,0.00043578315,0.0036950945,0.00009633753,0.0000053766025,0.000032209227,0.00003414835,0.000008612607,0.007609085],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99903524,0.00038450997,0.000048498056,0.00007706806,0.00025916655,0.00019553964],"domain_scores_gemma":[0.9965125,0.0012556341,0.00054665824,0.000080750055,0.0009739588,0.0006304972],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016802201,0.00018197941,0.00010689724,0.0022246821,0.0015277817,0.003321457,0.00046860205,0.00055763393,0.0033185852],"category_scores_gemma":[0.0042615663,0.00016972411,0.0001893233,0.00215933,0.0013044452,0.002257627,0.001005814,0.0005098549,0.00040798905],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002276633,0.0006323757,0.15457304,0.00065328507,0.00003288967,0.005857398,0.059555843,0.0073482734,0.005395344,0.4120823,0.008928195,0.34471333],"study_design_scores_gemma":[0.00005047592,0.0009874617,0.24436928,0.0008502441,0.00008736266,0.004426303,0.2198124,0.07471253,0.012353801,0.05707209,0.38515225,0.0001257642],"about_ca_topic_score_codex":0.004617738,"about_ca_topic_score_gemma":0.006508144,"teacher_disagreement_score":0.004617738,"about_ca_system_score_codex":0.003442863,"about_ca_system_score_gemma":0.00452471,"threshold_uncertainty_score":0.02497989},"labels":[],"label_agreement":null},{"id":"W2952938286","doi":"10.19255/jmpm01901","title":"Benchmarking Project Resilience","year":2019,"lang":"en","type":"article","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Resilience (materials science); Process management; Project management; Project management triangle; OPM3; Project charter; Extreme project management; Benchmarking; Set (abstract data type); Project team; Project planning; Project stakeholder; Computer science; Risk analysis (engineering); Business; Environmental resource management; Management science; Engineering; Knowledge management; Systems engineering; Environmental science","score_opus":0.029272037727386388,"score_gpt":0.3048704805826632,"score_spread":0.2755984428552768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2952938286","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5720205,0.0016251479,0.14770752,0.0024634572,0.0007436074,0.0037535965,0.012034425,0.0038679356,0.25578386],"genre_scores_gemma":[0.9391072,0.00059036916,0.03986154,0.00011142614,0.000045902656,0.0023529117,0.005671829,0.00032883754,0.011930022],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9787636,0.008056204,0.0023319449,0.0018840717,0.0068719224,0.0020922835],"domain_scores_gemma":[0.95027846,0.009612368,0.007182126,0.0065770457,0.022454893,0.003895158],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021191873,0.0009922283,0.00054641423,0.009377012,0.0014184855,0.0027648006,0.001314103,0.00062340166,0.014961907],"category_scores_gemma":[0.06624062,0.00028329744,0.0006722638,0.008009739,0.0012512726,0.0030461983,0.0066807494,0.00086513074,0.002502087],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007417359,0.00040024414,0.16780394,0.0015720509,0.00033852793,0.00033301095,0.009624914,0.04823955,0.0046289866,0.05155236,0.043594617,0.6711701],"study_design_scores_gemma":[0.00013948735,0.0027977508,0.57412803,0.002260111,0.00020482381,0.000732916,0.021066288,0.050491877,0.01146551,0.036155216,0.3000846,0.00047335122],"about_ca_topic_score_codex":0.008626788,"about_ca_topic_score_gemma":0.00999593,"teacher_disagreement_score":0.021191873,"about_ca_system_score_codex":0.0052622072,"about_ca_system_score_gemma":0.006146848,"threshold_uncertainty_score":0.11207473},"labels":[],"label_agreement":null},{"id":"W2953706728","doi":"10.29173/mocs116","title":"Evaluation of Risk Management Practice in the Nigeria Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Johannesburg","keywords":"Risk management plan; Risk management; Business; Control (management); Risk analysis (engineering); Project risk management; Identification (biology); IT risk management; Quality (philosophy); Exploratory factor analysis; Plan (archaeology); Operations management; Construction industry; Risk assessment; Enterprise risk management; Project management; Descriptive statistics; Construction management; Marketing; Project management triangle; Engineering; Management; Finance; Economics; Construction engineering; Geography","score_opus":0.036915369771391246,"score_gpt":0.32755710730506427,"score_spread":0.290641737533673,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953706728","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99251723,0.0004320653,0.0013749162,0.00048186004,0.0000114871045,0.00016406561,0.000010281362,0.00000878791,0.0049993424],"genre_scores_gemma":[0.99609864,0.00085368886,0.0020556478,0.000037951046,0.000004702681,0.000051922867,0.000009645364,0.0000033972265,0.00088425],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9860314,0.007643137,0.00096757256,0.00041119798,0.004342791,0.00060380367],"domain_scores_gemma":[0.9796377,0.00929163,0.0054537314,0.0005942881,0.0038879334,0.0011347798],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010081389,0.00035136574,0.00039162938,0.0026861313,0.0019314132,0.0030692315,0.00059905037,0.00063450757,0.0010010621],"category_scores_gemma":[0.024455905,0.00033054512,0.00026103598,0.0016350276,0.0014693751,0.0016076764,0.0020478696,0.00069725886,0.00016579356],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028167153,0.0012730048,0.32808873,0.0013483027,0.000060185124,0.003008846,0.37158388,0.0020624103,0.00668702,0.0032504434,0.0012165784,0.28113887],"study_design_scores_gemma":[0.000022588561,0.0017719755,0.25864094,0.0021881114,0.00007184,0.0022932556,0.70372874,0.0050419327,0.0041025993,0.0018756498,0.020103943,0.00015830783],"about_ca_topic_score_codex":0.002533025,"about_ca_topic_score_gemma":0.0038371263,"teacher_disagreement_score":0.010081389,"about_ca_system_score_codex":0.0023743506,"about_ca_system_score_gemma":0.0045952746,"threshold_uncertainty_score":0.053316176},"labels":[],"label_agreement":null},{"id":"W2954034942","doi":"10.29173/mocs84","title":"Decision Support Tool for Enhancing the Economic Impact of Construction using Offsite Systems","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Edinburgh Napier University","keywords":"Context (archaeology); Computer science; Sustainability; Data science; Process management; Knowledge management; Management science; Risk analysis (engineering); Engineering; Business","score_opus":0.031430257762814134,"score_gpt":0.31841623849304806,"score_spread":0.28698598073023396,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954034942","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22675753,0.001254162,0.5866497,0.006645431,0.00051390025,0.002427111,0.0067200405,0.02811795,0.1409142],"genre_scores_gemma":[0.5435274,0.0008848225,0.43932587,0.0004736676,0.000109746645,0.001152682,0.0027144558,0.00080528855,0.0110060405],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99722075,0.0014479789,0.00021593891,0.00025705647,0.0006969278,0.0001613381],"domain_scores_gemma":[0.982321,0.014914383,0.00055992225,0.0009463592,0.0008033952,0.00045484584],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004721839,0.0013190114,0.0006618545,0.0034202312,0.00086950825,0.0056390148,0.0018803558,0.0017360531,0.024575094],"category_scores_gemma":[0.017881727,0.00031691664,0.0010757888,0.0023293498,0.0009283964,0.00537332,0.004273367,0.001248877,0.0026522737],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014634929,0.0011266744,0.007400797,0.0047423793,0.00014874109,0.002295997,0.029590985,0.024714945,0.01828504,0.07532455,0.03590856,0.7989978],"study_design_scores_gemma":[0.000771589,0.0022025201,0.01566607,0.0064538065,0.00043641703,0.0018071085,0.03364489,0.14755167,0.032273527,0.17054263,0.58813244,0.0005173746],"about_ca_topic_score_codex":0.0007522843,"about_ca_topic_score_gemma":0.001036255,"teacher_disagreement_score":0.024575094,"about_ca_system_score_codex":0.001069705,"about_ca_system_score_gemma":0.0012994516,"threshold_uncertainty_score":0.08221185},"labels":[],"label_agreement":null},{"id":"W2954062416","doi":"10.29173/mocs93","title":"Risks Identification and Allocation in the Supply Chain of Modular Integrated Construction (MiC)","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Hong Kong Polytechnic University","keywords":"Supply chain; Risk management; Business; Risk analysis (engineering); Identification (biology); Supply chain risk management; Failure mode, effects, and criticality analysis; Bespoke; Modular design; Risk assessment; Stakeholder; Interdependence; Supply chain management; Operations management; Computer science; Service management; Engineering; Reliability engineering; Marketing; Finance","score_opus":0.03765976775095102,"score_gpt":0.29440180055112775,"score_spread":0.2567420328001767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954062416","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67973393,0.00057519303,0.30453107,0.0006815488,0.000050087936,0.00045157628,0.0002497747,0.00015786629,0.013568936],"genre_scores_gemma":[0.9572447,0.00024262312,0.040324934,0.000038613154,0.0000099961235,0.000100401056,0.0001659872,0.000018291435,0.0018543171],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9970872,0.0009160227,0.00018126372,0.0003304168,0.0011309024,0.00035429624],"domain_scores_gemma":[0.99573296,0.0015577425,0.0011791968,0.00016030997,0.0011598604,0.00021002386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035481178,0.0009954462,0.00040241366,0.0030925442,0.0012984315,0.0023469555,0.0006593921,0.000941843,0.0025168122],"category_scores_gemma":[0.007439582,0.0005404485,0.001076049,0.0019341848,0.000876795,0.0023269232,0.0020360432,0.0008558452,0.00021004003],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006757584,0.00029414752,0.113907106,0.0006433454,0.00035822648,0.002043309,0.004019249,0.61109984,0.014680181,0.051197704,0.002172366,0.1989087],"study_design_scores_gemma":[0.000045769084,0.00072735426,0.07054998,0.00031734156,0.0003069941,0.0007833842,0.0046847207,0.8332211,0.010233732,0.07063366,0.008291814,0.00020427458],"about_ca_topic_score_codex":0.0067301444,"about_ca_topic_score_gemma":0.0060347747,"teacher_disagreement_score":0.0067301444,"about_ca_system_score_codex":0.0024678456,"about_ca_system_score_gemma":0.002528492,"threshold_uncertainty_score":0.018764436},"labels":[],"label_agreement":null},{"id":"W2954958024","doi":"10.29173/mocs74","title":"Cost Evolution Throughout the Construction Value Chain","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cost estimate; Phase (matter); Track (disk drive); Perspective (graphical); Real estate; Business; Computer science; Construction engineering; Operations management; Marketing; Engineering; Systems engineering; Finance","score_opus":0.03892204446838546,"score_gpt":0.31430597392451376,"score_spread":0.27538392945612833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954958024","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9608155,0.00032098114,0.024788268,0.00020194394,0.000013371357,0.00007717923,0.000530651,0.0000761661,0.013176062],"genre_scores_gemma":[0.9877489,0.00020189582,0.0076626446,0.000008178824,0.000003903895,0.000053218413,0.00044168433,0.000032802363,0.0038466884],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9979315,0.0003170034,0.00010748512,0.00020089674,0.0011212834,0.0003217619],"domain_scores_gemma":[0.99303234,0.002661998,0.0011835131,0.00045457217,0.0024523123,0.00021523733],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014355143,0.0003532476,0.00022823513,0.0043311026,0.0005601056,0.0032218057,0.0006087094,0.000625977,0.0026912354],"category_scores_gemma":[0.009212103,0.00035025025,0.00035171094,0.0051001934,0.00054412946,0.0026386883,0.00079750206,0.0005600855,0.000476376],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006494668,0.0002909605,0.32266104,0.00026708952,0.00012266493,0.0010893001,0.0027124498,0.33691892,0.011138231,0.049469657,0.0016445016,0.2730357],"study_design_scores_gemma":[0.000022566097,0.0005915335,0.38552403,0.00018308223,0.00012186327,0.001003417,0.005538191,0.53826654,0.01819865,0.029861644,0.020475445,0.00021305321],"about_ca_topic_score_codex":0.008907207,"about_ca_topic_score_gemma":0.006942345,"teacher_disagreement_score":0.008907207,"about_ca_system_score_codex":0.0032492187,"about_ca_system_score_gemma":0.0012000364,"threshold_uncertainty_score":0.02357483},"labels":[],"label_agreement":null},{"id":"W2955999842","doi":"10.22260/isarc2019/0125","title":"Analysis of the Perceptions of Beneficiaries and Intermediaries on Implementing IPD in Indian Construction","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Intermediary; Integrated project delivery; Business; Distrust; Inefficiency; Exploratory research; Marketing; Project management; Public relations; Knowledge management; Management; Economics; Political science; Sociology","score_opus":0.021612736862027616,"score_gpt":0.3047528186413269,"score_spread":0.2831400817792993,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955999842","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99695635,0.000056992052,0.00015801351,0.00037106578,0.0000042810125,0.00003240794,0.000017022434,0.0000024869116,0.0024014125],"genre_scores_gemma":[0.9987685,0.00019488024,0.00014473502,0.00007676365,0.0000035956427,0.000022508695,0.000019507483,0.0000027691121,0.0007667352],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99529296,0.0017778709,0.00026732727,0.0001589662,0.0013563848,0.0011464455],"domain_scores_gemma":[0.98934084,0.0034101473,0.0023837322,0.00026767686,0.0017084731,0.002889061],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0054038004,0.00032889578,0.0003457013,0.0016432038,0.0033165466,0.003115583,0.00082321785,0.00079193094,0.004967927],"category_scores_gemma":[0.010028916,0.0004031601,0.00037983636,0.00113369,0.0024535928,0.0015216903,0.004354188,0.0019557006,0.0005234962],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018458739,0.0006536685,0.33652684,0.0004432804,0.000046469722,0.0026961125,0.6153645,0.0003437255,0.004532824,0.0023635614,0.0017593986,0.035085004],"study_design_scores_gemma":[0.000003067747,0.00021265922,0.13617873,0.00013812435,0.000013145478,0.00026984874,0.859022,0.00025604843,0.00029075996,0.00014292495,0.003443539,0.000029008652],"about_ca_topic_score_codex":0.009834591,"about_ca_topic_score_gemma":0.013043349,"teacher_disagreement_score":0.009834591,"about_ca_system_score_codex":0.0022015865,"about_ca_system_score_gemma":0.0029987623,"threshold_uncertainty_score":0.0285784},"labels":[],"label_agreement":null},{"id":"W2956030448","doi":"10.1061/9780784413517.153","title":"Assessment of the Effect of Changing Activities' Start Times on Cash-flow Parameters","year":2014,"lang":"en","type":"article","venue":"Construction Research Congress 2014","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Cash flow; Metric (unit); Flow (mathematics); Terminal value; Econometrics; Schedule; Cash flow forecasting; Computer science; Mathematics; Economics; Finance; Operations management","score_opus":0.0719499347758235,"score_gpt":0.42185933507696016,"score_spread":0.34990940030113665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956030448","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94296074,0.00019786698,0.05202068,0.00010242819,0.00002145454,0.00019965254,0.0005582316,0.00014671896,0.003792188],"genre_scores_gemma":[0.99574125,0.00006289128,0.003807787,0.000006399329,0.0000012065082,0.000040471743,0.00011763508,0.000006347737,0.000216044],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99814963,0.00074458076,0.00012657032,0.0002132509,0.00052925915,0.00023668267],"domain_scores_gemma":[0.9843327,0.0120011605,0.0016713819,0.00077716284,0.0010119884,0.00020568908],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044087735,0.00067836884,0.0004897742,0.0011473256,0.00029391708,0.0014146705,0.00060290727,0.00081333285,0.0016166684],"category_scores_gemma":[0.015527867,0.00034062334,0.0007170164,0.0012435438,0.00051775266,0.0012086395,0.00045741664,0.00070628675,0.0001614642],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028559144,0.00012941126,0.020080358,0.00008540202,0.000055359993,0.00013840955,0.00007362929,0.9592372,0.005865371,0.0014826679,0.00012046786,0.012446096],"study_design_scores_gemma":[0.000026323387,0.000697105,0.028337337,0.000027766446,0.00008581058,0.00009176417,0.00021111767,0.9517382,0.01648533,0.0016183365,0.00061915745,0.000061773986],"about_ca_topic_score_codex":0.005490722,"about_ca_topic_score_gemma":0.0040245284,"teacher_disagreement_score":0.005490722,"about_ca_system_score_codex":0.0013457861,"about_ca_system_score_gemma":0.0011725673,"threshold_uncertainty_score":0.023316145},"labels":[],"label_agreement":null},{"id":"W2956053921","doi":"10.29173/mocs72","title":"Research on Roles Transformation of Stakeholder in the Industry Chain of Industrialized Building in China Based on Niche Theory","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Chongqing University","keywords":"Industrialisation; Stakeholder; China; Business; Industrial organization; Division of labour; Chain (unit); Economic system; Economic geography; Economics; Management; Political science; Market economy","score_opus":0.1133153160279495,"score_gpt":0.3638496145292905,"score_spread":0.250534298501341,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956053921","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.972132,0.0014029492,0.004896463,0.0012375305,0.000015426693,0.00007320848,0.000032491982,0.0000066006687,0.020203259],"genre_scores_gemma":[0.99836355,0.0005201547,0.00038602197,0.000025485386,0.0000021790502,0.000013009612,0.000014795118,6.4747695e-7,0.0006741884],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985649,0.0005816164,0.0000721498,0.0001458612,0.00034350992,0.00029191398],"domain_scores_gemma":[0.9985643,0.00063380506,0.0002398185,0.000053642823,0.0003556087,0.00015280601],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020653433,0.00019967734,0.00016704686,0.0024232906,0.002064563,0.0020010627,0.000499209,0.00042949742,0.0019926745],"category_scores_gemma":[0.0025073027,0.00014904967,0.0003005284,0.002941737,0.0013964223,0.0033168697,0.0014014996,0.0003732937,0.000066534114],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001363236,0.0003025641,0.36662778,0.0013187298,0.000105917,0.003878061,0.12598278,0.0065103155,0.006558339,0.26602954,0.0019674099,0.22058223],"study_design_scores_gemma":[0.000032263815,0.00046365501,0.4718524,0.0011378637,0.0001511381,0.0010356935,0.36457604,0.03881954,0.005051976,0.059791043,0.056985624,0.00010274954],"about_ca_topic_score_codex":0.017160794,"about_ca_topic_score_gemma":0.027111243,"teacher_disagreement_score":0.017160794,"about_ca_system_score_codex":0.0055395155,"about_ca_system_score_gemma":0.0058064093,"threshold_uncertainty_score":0.040192246},"labels":[],"label_agreement":null},{"id":"W2958346082","doi":"10.1061/(asce)me.1943-5479.0000707","title":"Differentiation of Evaluation Criteria in Design-Build and Construction Manager at Risk Procurements","year":2019,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Procurement; Sample (material); Selection (genetic algorithm); Business; Operations management; Value (mathematics); Marketing; Computer science; Economics; Statistics; Mathematics","score_opus":0.042625944163370545,"score_gpt":0.32301174984595277,"score_spread":0.2803858056825822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2958346082","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96631205,0.00037650086,0.020713108,0.00045140475,0.00003213487,0.0005021878,0.00005302643,0.000033355696,0.0115263],"genre_scores_gemma":[0.9832961,0.000059181773,0.01588912,0.000044988865,0.0000067223573,0.00020693339,0.00003853015,0.0000144367405,0.0004439846],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.8592682,0.09753261,0.010913272,0.001819715,0.026645463,0.003820794],"domain_scores_gemma":[0.72142243,0.20515852,0.021876778,0.005383494,0.040516436,0.005642407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.12374926,0.0005993242,0.0008601623,0.008886516,0.0022731882,0.005606962,0.001324128,0.00069624226,0.0022298766],"category_scores_gemma":[0.21678016,0.0004437215,0.00064980256,0.006103087,0.0033193582,0.0032534823,0.004383346,0.0012404858,0.00038366046],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0030429356,0.0010285203,0.48841536,0.00088482344,0.00021227429,0.0005154816,0.04967822,0.0072625573,0.005499372,0.02599167,0.001924496,0.41554427],"study_design_scores_gemma":[0.00026775434,0.0032706908,0.7783712,0.0012384054,0.00018020083,0.0007719127,0.10525361,0.05100198,0.013017615,0.034343082,0.011719867,0.00056362594],"about_ca_topic_score_codex":0.0034448744,"about_ca_topic_score_gemma":0.005704928,"teacher_disagreement_score":0.12374926,"about_ca_system_score_codex":0.005370385,"about_ca_system_score_gemma":0.0046031005,"threshold_uncertainty_score":0.6544565},"labels":[],"label_agreement":null},{"id":"W2959758102","doi":"10.1007/s11518-019-5420-1","title":"Strategic Analysis of a Regulatory Conflict Using Dempster-Shafer Theory and AHP for Preference Elicitation","year":2019,"lang":"en","type":"article","venue":"Journal of Systems Science and Systems Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Wilfrid Laurier University; University of Waterloo","funders":"Universidade Federal de Pernambuco; Conselho Nacional de Desenvolvimento Científico e Tecnológico","keywords":"Analytic hierarchy process; Pairwise comparison; Dempster–Shafer theory; Preference elicitation; Preference; Ranking (information retrieval); Flexibility (engineering); Game theory; Computer science; Operations research; Artificial intelligence; Management science; Engineering; Mathematics; Microeconomics; Economics; Mathematical economics; Statistics","score_opus":0.15253824439516211,"score_gpt":0.34935436633877215,"score_spread":0.19681612194361003,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2959758102","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12433291,0.00008148469,0.86608106,0.00043654136,0.000042433494,0.0011177141,0.00026817463,0.00011086242,0.0075288657],"genre_scores_gemma":[0.6233476,0.00008118005,0.37467968,0.000057484307,0.000011009318,0.0007227903,0.00020266495,0.000020031137,0.00087760284],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9838266,0.01156483,0.00084679195,0.000509875,0.0026551955,0.00059671036],"domain_scores_gemma":[0.9707144,0.024460295,0.00087040116,0.000724815,0.0028191854,0.00041086302],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013809749,0.000800259,0.0011240714,0.0040447204,0.0019107851,0.0029554977,0.0012358916,0.0011576302,0.004297237],"category_scores_gemma":[0.031834956,0.0005576331,0.0014756148,0.0031611926,0.0011428065,0.0026224933,0.0024153558,0.0015908806,0.0002602383],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016222129,0.0010596018,0.008210235,0.0016795045,0.0004275397,0.0007466561,0.006908951,0.43349525,0.011930086,0.21891455,0.003244652,0.31176078],"study_design_scores_gemma":[0.00011178683,0.00028743627,0.0013761474,0.000092091206,0.00008852745,0.00010991414,0.0031487036,0.89065367,0.0057842126,0.096128285,0.0021217105,0.00009755215],"about_ca_topic_score_codex":0.0047905426,"about_ca_topic_score_gemma":0.007250916,"teacher_disagreement_score":0.013809749,"about_ca_system_score_codex":0.003318199,"about_ca_system_score_gemma":0.006666114,"threshold_uncertainty_score":0.07303387},"labels":[],"label_agreement":null},{"id":"W2963910661","doi":"10.1177/8756972819858150","title":"Project Organizing and Its Impact— A Festschrift for Hans Georg Gemünden","year":2019,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Project management; Engineering; Management; Sociology; Systems engineering; Economics","score_opus":0.08090662978082286,"score_gpt":0.41086901518215896,"score_spread":0.3299623854013361,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2963910661","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020815108,0.295053,0.004122333,0.6223719,0.031640608,0.000039018967,0.00040704967,0.00007622332,0.02547479],"genre_scores_gemma":[0.42941526,0.33428824,0.008139424,0.064044915,0.051090065,0.00017514374,0.0004084785,0.0004560454,0.11198244],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984609,0.0007040538,0.00007175406,0.00022077559,0.0003788069,0.0001636157],"domain_scores_gemma":[0.9961202,0.0023709969,0.00017673588,0.00010445631,0.0005983581,0.0006292548],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0048236544,0.0007583159,0.00062160875,0.0012820093,0.0025104675,0.0053618564,0.0006019759,0.0026005013,0.0046364428],"category_scores_gemma":[0.0066287615,0.00039543398,0.0003968437,0.0017292184,0.0031950942,0.0051648733,0.0040474236,0.004253165,0.0009810429],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034665648,0.0002036743,0.0013387147,0.00062748545,0.00007247832,0.00046597395,0.007710328,0.0019191342,0.0016571756,0.18609688,0.6909082,0.10865332],"study_design_scores_gemma":[0.000030411878,0.000099500874,0.002594939,0.00067039434,0.000020767202,0.00025621548,0.0064399694,0.0010078227,0.0007744205,0.06051732,0.9274981,0.00009017859],"about_ca_topic_score_codex":0.00598832,"about_ca_topic_score_gemma":0.0049755936,"teacher_disagreement_score":0.00598832,"about_ca_system_score_codex":0.0022346186,"about_ca_system_score_gemma":0.0025855284,"threshold_uncertainty_score":0.025510252},"labels":[],"label_agreement":null},{"id":"W2964510303","doi":"10.2139/ssrn.3045937","title":"Advancing Dispute Resolution by Unpacking the Sources of Conflict: Toward an Integrated Framework","year":2017,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Unpacking; Conflict resolution; Dispute resolution; Resolution (logic); Political science; Computer science; Law; Linguistics; Artificial intelligence","score_opus":0.04393374170892967,"score_gpt":0.3600879151303911,"score_spread":0.31615417342146146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2964510303","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016008008,0.0059380415,0.82617104,0.06590077,0.00071681594,0.00039546395,0.00015715542,0.00022492761,0.08448767],"genre_scores_gemma":[0.48744595,0.0059349197,0.5002017,0.00197426,0.00065809983,0.000569812,0.00023287027,0.0001507814,0.0028316157],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9652825,0.021727804,0.0024634355,0.0020683343,0.0067859152,0.0016719949],"domain_scores_gemma":[0.94682497,0.030919941,0.0071979132,0.005780934,0.0066916714,0.0025845529],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.05616069,0.0024956176,0.0026612342,0.017487947,0.008146838,0.041942593,0.00973092,0.012054449,0.0061392467],"category_scores_gemma":[0.06513206,0.0017953046,0.0023152726,0.010228366,0.037993964,0.05744215,0.023219254,0.012123881,0.001194643],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021667442,0.00009696607,0.0013830552,0.0002507311,0.000050127277,0.00007455713,0.0025856793,0.0051935674,0.00019686903,0.9590479,0.001308015,0.029790841],"study_design_scores_gemma":[0.000013589404,0.00002001567,0.0002311447,0.00038809644,0.00003625369,0.000042444117,0.003306582,0.009489114,0.00020583527,0.977706,0.0085364,0.000024561465],"about_ca_topic_score_codex":0.006612805,"about_ca_topic_score_gemma":0.009752148,"teacher_disagreement_score":0.05616069,"about_ca_system_score_codex":0.007957122,"about_ca_system_score_gemma":0.029941503,"threshold_uncertainty_score":0.29700965},"labels":[],"label_agreement":null},{"id":"W2964546427","doi":"","title":"Research and innovation in construction: Collaboration in the last quarter century","year":2018,"lang":"en","type":"article","venue":"LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Context (archaeology); Political science; Business; Engineering; Public relations; Geography; Archaeology","score_opus":0.06519302499658501,"score_gpt":0.34729605928486046,"score_spread":0.28210303428827543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2964546427","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04632362,0.45514643,0.009113832,0.31067985,0.0063611404,0.00006667485,0.00008449432,0.00013405297,0.17208992],"genre_scores_gemma":[0.69555694,0.21823624,0.009933922,0.02744466,0.0057219584,0.0002378287,0.00014001701,0.000112664035,0.042615823],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9666299,0.020188091,0.0019414722,0.0026138348,0.005745429,0.0028812543],"domain_scores_gemma":[0.97052246,0.014769773,0.0032606944,0.0021493859,0.0034141978,0.0058835912],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0237633,0.0004617933,0.0012317237,0.00401628,0.009388133,0.021280944,0.0012462948,0.00963101,0.0065357964],"category_scores_gemma":[0.01544928,0.000417314,0.0005821663,0.009999522,0.025716057,0.01729165,0.019430092,0.0062515596,0.0008757439],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012118168,0.00014421235,0.003394936,0.0013515506,0.000048709677,0.00048412982,0.0857779,0.00067371584,0.00047508295,0.69752777,0.025605448,0.18439542],"study_design_scores_gemma":[0.00001846077,0.00010453623,0.0024497772,0.0010413935,0.000009479528,0.00046867342,0.032041132,0.00022014085,0.000115659095,0.07703957,0.886451,0.00004011514],"about_ca_topic_score_codex":0.0051726284,"about_ca_topic_score_gemma":0.00753229,"teacher_disagreement_score":0.0237633,"about_ca_system_score_codex":0.013090003,"about_ca_system_score_gemma":0.022862129,"threshold_uncertainty_score":0.12567383},"labels":[],"label_agreement":null},{"id":"W2964654665","doi":"10.14288/1.0378439","title":"Identifying the key innovative and collaborative strategies of integrated project delivery method to achieve owner goals in housing projects","year":2019,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Key (lock); Integrated project delivery; Process management; Business; Engineering management; Computer science; Engineering; Systems engineering; Project management; Computer security","score_opus":0.04261471961453702,"score_gpt":0.29605290727549066,"score_spread":0.25343818766095366,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2964654665","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8209856,0.001346917,0.07503074,0.003803901,0.0000455796,0.0024595389,0.00005712303,0.00009753656,0.096173055],"genre_scores_gemma":[0.93111646,0.00085597736,0.06372376,0.00016846467,0.0000056221274,0.0006092545,0.000028015524,0.000021416652,0.0034709692],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.97471386,0.017332647,0.0008861249,0.001266888,0.0036512918,0.0021491447],"domain_scores_gemma":[0.986516,0.0075909854,0.0021049415,0.00068766595,0.0021012507,0.0009992003],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01785955,0.0005691737,0.0003302865,0.0020122076,0.0029899576,0.008978752,0.0014945555,0.0016138124,0.0018154753],"category_scores_gemma":[0.017801337,0.00046261572,0.00048513338,0.0020608597,0.0038639877,0.0055178446,0.0045795883,0.0013287752,0.00042793812],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001929669,0.0009890143,0.055760145,0.0024662127,0.0001357324,0.0015920614,0.21300592,0.0050356835,0.00818337,0.13064452,0.0031912334,0.5788031],"study_design_scores_gemma":[0.00019734069,0.002302636,0.14205475,0.0048711277,0.00038496617,0.0025530916,0.57140565,0.03133808,0.022418194,0.06448939,0.15764144,0.00034332759],"about_ca_topic_score_codex":0.0052938913,"about_ca_topic_score_gemma":0.010695332,"teacher_disagreement_score":0.01785955,"about_ca_system_score_codex":0.0064851595,"about_ca_system_score_gemma":0.016035436,"threshold_uncertainty_score":0.09445143},"labels":[],"label_agreement":null},{"id":"W2964887580","doi":"10.5465/ambpp.2019.15874abstract","title":"Exploring Project Management as a Career Path for Contemporary Emerging Adults","year":2019,"lang":"en","type":"article","venue":"Academy of Management Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Work (physics); Career development; Social cognitive theory; Career path; Project management; Career management; Path analysis (statistics); Perception; Cognition; Psychology; Public relations; Knowledge management; Political science; Management; Social psychology; Computer science; Engineering; Economics","score_opus":0.2568505317343543,"score_gpt":0.3700440071138964,"score_spread":0.11319347537954211,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2964887580","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9977041,0.0002119672,0.00018652614,0.00044622718,0.0000071657396,0.000006594392,0.000011802393,0.0000011188425,0.0014244512],"genre_scores_gemma":[0.99866056,0.00039021389,0.00022182168,0.00014273806,0.0000053549925,0.000012434936,0.000023190414,8.691675e-7,0.0005428667],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9994962,0.00020034914,0.000024841063,0.000043010874,0.000104724306,0.00013091762],"domain_scores_gemma":[0.9974685,0.0005719984,0.0005901162,0.00005652484,0.00034526954,0.0009675593],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021321268,0.0001254779,0.00015068776,0.00060625974,0.0015662952,0.0022672045,0.00023589774,0.0004463413,0.0015584863],"category_scores_gemma":[0.0039988896,0.00015378073,0.00013696514,0.00037789127,0.0007024133,0.0017313657,0.0018197439,0.0012333808,0.00017441307],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037719325,0.0003052234,0.7293141,0.000084237356,0.00001060086,0.0004442569,0.21342109,0.000057063982,0.00083034375,0.0025150187,0.0011671204,0.051813345],"study_design_scores_gemma":[0.0000075292483,0.00037473592,0.5027704,0.0001878754,0.000011655357,0.0006384125,0.48266786,0.0003833579,0.00019317173,0.0012019629,0.0115475785,0.000015499056],"about_ca_topic_score_codex":0.0033963944,"about_ca_topic_score_gemma":0.008937338,"teacher_disagreement_score":0.0033963944,"about_ca_system_score_codex":0.00041527342,"about_ca_system_score_gemma":0.0010643743,"threshold_uncertainty_score":0.011275947},"labels":[],"label_agreement":null},{"id":"W2966462356","doi":"10.5539/ibr.v12n8p116","title":"Project Management Success in a Troubled Environment: The Mobile Telecommunications Sector in Mogadishu, Somalia","year":2019,"lang":"en","type":"article","venue":"International Business Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Principal (computer security); Profitability index; Capital (architecture); Marketing; Telecommunications; Finance; Computer security; Engineering; Computer science","score_opus":0.14580648702653382,"score_gpt":0.44248090931830547,"score_spread":0.29667442229177166,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2966462356","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99926966,0.00004393376,0.000021384973,0.00009673168,9.490343e-7,0.0000042747515,0.0000045225056,4.5125557e-7,0.0005581099],"genre_scores_gemma":[0.9994825,0.00013224268,0.000055153665,0.000027956834,0.0000010806001,0.000006757146,0.000006534053,6.571482e-7,0.0002870588],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9990964,0.00038742655,0.000030148649,0.000054741988,0.00007389805,0.00035745418],"domain_scores_gemma":[0.9988765,0.0002747252,0.00040775514,0.000036364243,0.000094636576,0.00031003545],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010183287,0.0001933346,0.00023765657,0.0009806579,0.0052718534,0.0026106753,0.00052498,0.00085516577,0.0014281016],"category_scores_gemma":[0.0019413235,0.0002899595,0.00011599609,0.0014279868,0.002617493,0.0010401431,0.0026187608,0.00070021546,0.0002159935],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019163797,0.00033690815,0.5662524,0.00019491497,0.00003467636,0.00866069,0.38285846,0.00047649833,0.004316584,0.0025520215,0.0008542249,0.033270963],"study_design_scores_gemma":[0.000008020408,0.00030158952,0.3646159,0.0000902747,0.000011132166,0.0011169598,0.6293194,0.00019814963,0.00028844408,0.00029936456,0.0037341218,0.000016682778],"about_ca_topic_score_codex":0.013178497,"about_ca_topic_score_gemma":0.048273265,"teacher_disagreement_score":0.013178497,"about_ca_system_score_codex":0.002448859,"about_ca_system_score_gemma":0.003145287,"threshold_uncertainty_score":0.026203573},"labels":[],"label_agreement":null},{"id":"W2968457353","doi":"10.1139/cjce-2018-0774","title":"Optimizing the cost, LEED credits, and time trade-offs using a genetic algorithmic model","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Genetic algorithm; Computer science; Sustainability; Mathematical optimization; Quality (philosophy); Exponential growth; Econometrics; Simulation; Economics; Mathematics; Ecology","score_opus":0.03712964030729606,"score_gpt":0.25481476188965085,"score_spread":0.21768512158235478,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2968457353","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31745383,0.0009920418,0.6453272,0.001735424,0.00010715712,0.0004946307,0.00049227255,0.00029197184,0.03310549],"genre_scores_gemma":[0.89518476,0.00057222706,0.09574551,0.0001818037,0.000027616086,0.0005184453,0.0002175586,0.000051691208,0.0075003016],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993936,0.00027537983,0.00002193595,0.000089833826,0.000107407366,0.000111829766],"domain_scores_gemma":[0.9980416,0.00153248,0.00014457326,0.000039645467,0.00017846595,0.00006325041],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017089198,0.0011068069,0.0011233991,0.0013800478,0.0005958799,0.002260173,0.0013624959,0.0023537558,0.0032417544],"category_scores_gemma":[0.0045048823,0.00065170595,0.001001284,0.0015118136,0.000880199,0.0012576203,0.00080182456,0.0012414231,0.00023159519],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012036532,0.000019852041,0.0002570512,0.0000104124,0.0000063270204,0.000015680267,0.00000767427,0.99625635,0.000081583916,0.0014884283,0.000099157834,0.0017453369],"study_design_scores_gemma":[0.0000054318657,0.00001416081,0.00008683039,0.000004131545,0.0000054165744,0.000003511232,0.0000085879,0.99892694,0.000048197813,0.0008045627,0.00008970048,0.0000025591285],"about_ca_topic_score_codex":0.022786625,"about_ca_topic_score_gemma":0.017692076,"teacher_disagreement_score":0.022786625,"about_ca_system_score_codex":0.002863276,"about_ca_system_score_gemma":0.0030638087,"threshold_uncertainty_score":0.045307994},"labels":[],"label_agreement":null},{"id":"W2970351888","doi":"10.1139/cjce-2018-0405","title":"This has been a real uphill battle — three organisations for the adoption of Last Planner System","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Työsuojelurahasto","keywords":"Expansive; Planner; Process (computing); Agency (philosophy); Battle; Work (physics); Knowledge management; Organizational learning; Business; Engineering; Computer science; Sociology; Artificial intelligence","score_opus":0.043225868359134806,"score_gpt":0.24771884875211564,"score_spread":0.20449298039298083,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2970351888","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93909115,0.00070417725,0.0068564634,0.030766297,0.00027905105,0.00017360614,0.000049069582,0.00013014334,0.02195006],"genre_scores_gemma":[0.9910625,0.00020437718,0.003017846,0.0014361017,0.00003335179,0.000049037193,0.000042484033,0.00002745878,0.0041268356],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99241686,0.0028513928,0.00017645671,0.0005668255,0.0023264992,0.001661913],"domain_scores_gemma":[0.9803782,0.005827974,0.0026324147,0.0016414555,0.0030312159,0.0064887153],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009155458,0.0002469664,0.00026969428,0.00089697953,0.011216254,0.004748446,0.0012487253,0.002898678,0.004127875],"category_scores_gemma":[0.017921884,0.0003690119,0.00042414223,0.0010430013,0.00512625,0.0032526613,0.0050687655,0.0050746943,0.00056189124],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010212508,0.001869764,0.18579105,0.0006007828,0.0001058701,0.009043196,0.3550838,0.0035950518,0.012266329,0.08800441,0.030535609,0.31208295],"study_design_scores_gemma":[0.00010382133,0.001453587,0.09624175,0.00039795405,0.000045812376,0.0025235175,0.39218634,0.0018261205,0.0035181302,0.009547009,0.49179193,0.00036408985],"about_ca_topic_score_codex":0.015434431,"about_ca_topic_score_gemma":0.026874745,"teacher_disagreement_score":0.015434431,"about_ca_system_score_codex":0.007550692,"about_ca_system_score_gemma":0.011329259,"threshold_uncertainty_score":0.054784298},"labels":[],"label_agreement":null},{"id":"W2970571036","doi":"10.1139/cjce-2019-0228","title":"A framework for value visualization in the construction industry to support value-oriented design","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Visualization; Interdependence; Computer science; Value (mathematics); Process (computing); Bridge (graph theory); Process management; Systems engineering; Knowledge management; Engineering; Data mining","score_opus":0.054768764101517806,"score_gpt":0.32692346682964085,"score_spread":0.27215470272812303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2970571036","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016719105,0.00038412047,0.98588294,0.001661391,0.000071305185,0.00022952145,0.00016603622,0.0007659494,0.009166764],"genre_scores_gemma":[0.03302963,0.00040948074,0.9646064,0.00008492025,0.000027841394,0.00039746377,0.0002350728,0.000097899516,0.0011113053],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99455136,0.00347522,0.00047014945,0.0004660519,0.00077381113,0.0002633144],"domain_scores_gemma":[0.99305624,0.0038675193,0.00047489777,0.000873896,0.0012483939,0.0004790046],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010189371,0.0015660692,0.00079674355,0.0058696605,0.0021969436,0.010617506,0.0027247975,0.0021340672,0.0059302314],"category_scores_gemma":[0.013672697,0.0009446245,0.0022655786,0.0048577976,0.004838154,0.007935899,0.005143306,0.0034112595,0.0011107832],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002883325,0.00006216216,0.0006217793,0.00031619408,0.000029578669,0.00028767623,0.0049142176,0.011430906,0.0014420022,0.9261783,0.0046970434,0.049991194],"study_design_scores_gemma":[0.000049667226,0.000067874746,0.0006085765,0.0010288173,0.000050402152,0.00043813227,0.0028212592,0.10655886,0.0018969419,0.69842327,0.18796471,0.00009152589],"about_ca_topic_score_codex":0.009603191,"about_ca_topic_score_gemma":0.009161144,"teacher_disagreement_score":0.010617506,"about_ca_system_score_codex":0.0034616534,"about_ca_system_score_gemma":0.0046986844,"threshold_uncertainty_score":0.05388719},"labels":[],"label_agreement":null},{"id":"W2971357609","doi":"","title":"Superior and Threshold Project Competencies","year":2000,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science","score_opus":0.09867804549262757,"score_gpt":0.3545112284814576,"score_spread":0.25583318298883007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2971357609","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9181869,0.00019040916,0.0033891704,0.00037957865,0.000007631336,0.000026263224,0.00006300015,0.000018370267,0.07773863],"genre_scores_gemma":[0.9984471,0.00003762912,0.00040038154,0.000019343837,0.0000027833096,0.000010359769,0.000017838487,0.000002660796,0.0010619081],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99715376,0.00067189,0.00017174982,0.00037557285,0.00088985875,0.00073716923],"domain_scores_gemma":[0.9793585,0.011044297,0.0027642965,0.0013566599,0.0016909316,0.0037852684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003286038,0.00017753121,0.00031781406,0.0017975406,0.0005658506,0.0030524514,0.00041876835,0.00071265484,0.009312326],"category_scores_gemma":[0.03674373,0.0002047342,0.00015951748,0.00063741015,0.002246232,0.0033559054,0.0038273167,0.0010567417,0.00052134995],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001342868,0.00066071865,0.25053266,0.00034442573,0.00006236206,0.00056700996,0.017328454,0.005840238,0.010788624,0.56046087,0.0019315365,0.15014026],"study_design_scores_gemma":[0.00013813184,0.00082642084,0.61343247,0.00036506454,0.000074449905,0.0011124187,0.017978365,0.014498859,0.004656651,0.3388027,0.00805875,0.00005578056],"about_ca_topic_score_codex":0.00132114,"about_ca_topic_score_gemma":0.0019365693,"teacher_disagreement_score":0.009312326,"about_ca_system_score_codex":0.0009750006,"about_ca_system_score_gemma":0.0018217198,"threshold_uncertainty_score":0.031152844},"labels":[],"label_agreement":null},{"id":"W2971528707","doi":"10.1139/cjce-2018-0461","title":"Metaphors of collaboration in construction","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Consistency (knowledge bases); Knowledge management; Sociology; Computer science; Conceptual framework; Engineering ethics; Epistemology; Management science; Engineering; Social science","score_opus":0.018491411079972427,"score_gpt":0.26647178847923664,"score_spread":0.2479803773992642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2971528707","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10681298,0.032010205,0.24557891,0.05116377,0.0017756957,0.00042210854,0.00028486308,0.0002988828,0.56165254],"genre_scores_gemma":[0.952058,0.0040857974,0.034858353,0.0013127183,0.00014567657,0.00046770895,0.00007931697,0.0000888435,0.006903515],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9836475,0.01295983,0.00047944332,0.0005800524,0.0016622575,0.00067089376],"domain_scores_gemma":[0.99409604,0.0034325002,0.00070057035,0.00065744866,0.00057051424,0.00054296374],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007917585,0.0009967263,0.00054883014,0.0038221572,0.0061223283,0.008198585,0.0014599931,0.0032377124,0.003736219],"category_scores_gemma":[0.010830937,0.00036810103,0.00073609775,0.0038046946,0.037067212,0.010456901,0.007896339,0.0029431107,0.00048833754],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013884502,0.0000077158265,0.0002423035,0.00011164904,0.0000037884627,0.0001528813,0.04233234,0.0002446669,0.00014545387,0.95172286,0.0013744859,0.0036479083],"study_design_scores_gemma":[0.00003428524,0.00004619985,0.0009195937,0.00062888325,0.000013971804,0.0012658542,0.062332284,0.001370282,0.00021115766,0.67301095,0.26011762,0.000048899725],"about_ca_topic_score_codex":0.003545226,"about_ca_topic_score_gemma":0.0026776309,"teacher_disagreement_score":0.008198585,"about_ca_system_score_codex":0.0059215236,"about_ca_system_score_gemma":0.0043490273,"threshold_uncertainty_score":0.042963862},"labels":[],"label_agreement":null},{"id":"W2973098918","doi":"10.1139/cjce-2019-0258","title":"Extended review of contractor selection in construction projects","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Selection (genetic algorithm); Identification (biology); Context (archaeology); Work (physics); Construction management; Operations research; Engineering; Computer science; Operations management; Construction engineering; Civil engineering; Artificial intelligence","score_opus":0.02574136816608626,"score_gpt":0.2729246935793345,"score_spread":0.24718332541324825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2973098918","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00095252844,0.99402726,0.0003546103,0.0015816899,0.0005807131,0.000037244034,0.00016494449,0.000004705741,0.0022962787],"genre_scores_gemma":[0.0088788215,0.9889681,0.0006656614,0.0005710796,0.0003041243,0.00004335918,0.000147745,0.0000049951223,0.00041623245],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.99043274,0.0036063762,0.0024986141,0.00064738316,0.0025261245,0.00028886704],"domain_scores_gemma":[0.9176471,0.061038207,0.005702643,0.0010304506,0.01378965,0.0007919281],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011404558,0.0005837003,0.0014810996,0.013841196,0.0008459021,0.0035394533,0.0010866371,0.0016672115,0.0056654285],"category_scores_gemma":[0.053262684,0.00041747192,0.0013866428,0.022929788,0.0010000631,0.0027440288,0.00119723,0.0011410095,0.000724086],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015923787,0.00006634352,0.0022984378,0.21098846,0.0005205001,0.00024361313,0.0014501616,0.00051022274,0.00044536788,0.0077745235,0.037174515,0.7383686],"study_design_scores_gemma":[0.000024689703,0.00017818,0.011428559,0.2787212,0.001191874,0.0006812825,0.0016787814,0.000196287,0.00042358993,0.002191805,0.7032236,0.000060113187],"about_ca_topic_score_codex":0.012793054,"about_ca_topic_score_gemma":0.026708025,"teacher_disagreement_score":0.013841196,"about_ca_system_score_codex":0.0045908093,"about_ca_system_score_gemma":0.019581048,"threshold_uncertainty_score":0.06031382},"labels":[],"label_agreement":null},{"id":"W2974151464","doi":"10.22060/ajce.2019.16406.5585","title":"Success Breakdown Structure: Application to Petrochemical Projects Success Assessment","year":2020,"lang":"en","type":"article","venue":"AUT Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Success factors; Delphi method; Petrochemical; Serviceability (structure); Engineering; Quality (philosophy); Critical success factor; Process management; Business; Knowledge management; Marketing; Computer science","score_opus":0.029335266036645782,"score_gpt":0.32176388334081135,"score_spread":0.2924286173041656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2974151464","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6361194,0.0005153591,0.3089255,0.00089359254,0.00010974669,0.0038845981,0.004801104,0.0017123033,0.043038346],"genre_scores_gemma":[0.79295266,0.00017293844,0.2010191,0.000043942855,0.000019313378,0.0019805294,0.0019470025,0.00006293737,0.0018016965],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9935976,0.0023732493,0.0008722749,0.00049075903,0.0022828497,0.00038334238],"domain_scores_gemma":[0.9597963,0.026794743,0.0042155525,0.0013596327,0.0067865555,0.0010472485],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008554052,0.00086974894,0.0005729202,0.011489754,0.0010794186,0.002679256,0.00078511285,0.0009223098,0.0070537655],"category_scores_gemma":[0.038292106,0.00037122527,0.0012761367,0.007389757,0.001248764,0.0026482542,0.0028443157,0.0012759769,0.0011210889],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006674947,0.0009197519,0.35177425,0.0020432614,0.000322258,0.0005981753,0.02304207,0.023752019,0.006683448,0.04580488,0.007196703,0.5371957],"study_design_scores_gemma":[0.00016353502,0.0022092394,0.42571256,0.0014391802,0.00023966764,0.0014031762,0.053868096,0.38537234,0.008886261,0.072533205,0.047789387,0.00038328997],"about_ca_topic_score_codex":0.004684903,"about_ca_topic_score_gemma":0.004916943,"teacher_disagreement_score":0.011489754,"about_ca_system_score_codex":0.0033216355,"about_ca_system_score_gemma":0.0020558096,"threshold_uncertainty_score":0.045238733},"labels":[],"label_agreement":null},{"id":"W2976409315","doi":"10.7492/ijaec.2019.010","title":"Impact of Procurement Methods on Material Waste in Low-Rise Building Projects in Nigeria","year":2019,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Procurement; Business; Architectural engineering; Waste management; Engineering; Marketing","score_opus":0.01704424389495795,"score_gpt":0.3523622503169978,"score_spread":0.33531800642203985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2976409315","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9987387,0.00012135449,0.0000774933,0.00002348128,0.0000021583862,0.0000064667815,0.000015954462,7.0739344e-7,0.0010136792],"genre_scores_gemma":[0.9990408,0.00016674155,0.00018118139,0.0000045539696,0.0000011331965,0.0000048190873,0.000014840168,9.2356146e-7,0.0005848779],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9985154,0.00059731945,0.0001242799,0.000075999116,0.00032892995,0.00035812127],"domain_scores_gemma":[0.99663204,0.0016012315,0.00089361914,0.000074108255,0.0005417475,0.0002571572],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015004576,0.00026735506,0.00028136317,0.0010280664,0.0009102919,0.0017040685,0.00045879852,0.00045762336,0.0018520417],"category_scores_gemma":[0.0029727549,0.00024449002,0.0003326642,0.0016207009,0.0006828828,0.00075946,0.0008694893,0.00059211033,0.00017095574],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016811483,0.0014510396,0.89113885,0.0006996339,0.00010395223,0.0024614518,0.00851943,0.006741542,0.007337214,0.0038745033,0.00028750757,0.07570382],"study_design_scores_gemma":[0.000016538892,0.0013283475,0.94229364,0.00041165893,0.00012294631,0.0005614275,0.044907454,0.0027961454,0.004448563,0.00083130586,0.0022423028,0.000039642026],"about_ca_topic_score_codex":0.013046897,"about_ca_topic_score_gemma":0.040977854,"teacher_disagreement_score":0.013046897,"about_ca_system_score_codex":0.0026743566,"about_ca_system_score_gemma":0.0028133872,"threshold_uncertainty_score":0.025941908},"labels":[],"label_agreement":null},{"id":"W2977326930","doi":"10.18485/epmj.2019.9.1.5","title":"Human Resource Management in Project Management: Ideas at the Cusp","year":2019,"lang":"en","type":"article","venue":"European Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Brandon University","funders":"","keywords":"Human resource management; Resource management (computing); Cusp (singularity); Business; Knowledge management; Process management; Engineering management; Computer science; Engineering; Mathematics","score_opus":0.061603134491938265,"score_gpt":0.3504630858178673,"score_spread":0.288859951325929,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2977326930","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01287058,0.2757104,0.06757458,0.5602238,0.0055901543,0.00021256931,0.000106932035,0.00011763433,0.0775933],"genre_scores_gemma":[0.5196853,0.2875405,0.0824202,0.0789344,0.014093978,0.0011646998,0.00013239746,0.00015644616,0.015872067],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9910875,0.006407236,0.00035905777,0.00049860217,0.0012619419,0.00038575134],"domain_scores_gemma":[0.97956014,0.016218226,0.0007357891,0.0006450543,0.0017148134,0.0011259897],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020554362,0.0008297631,0.0010355499,0.0059783123,0.00376384,0.017833238,0.0030222035,0.0081108445,0.003256069],"category_scores_gemma":[0.010776797,0.00049509166,0.00059530494,0.0065950085,0.037454147,0.027100017,0.005346782,0.0100726085,0.0008070966],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035657475,0.00009579035,0.0006889089,0.0013239183,0.000019080266,0.00016423038,0.018640168,0.00045752485,0.00017122184,0.9201621,0.009039238,0.049202286],"study_design_scores_gemma":[0.000019204252,0.000095887015,0.0014089983,0.003412299,0.0000130082935,0.00022639005,0.022777934,0.00091857504,0.00013698173,0.8099138,0.1610326,0.000044227374],"about_ca_topic_score_codex":0.002544869,"about_ca_topic_score_gemma":0.0020650544,"teacher_disagreement_score":0.020554362,"about_ca_system_score_codex":0.005317211,"about_ca_system_score_gemma":0.00805848,"threshold_uncertainty_score":0.10870314},"labels":[],"label_agreement":null},{"id":"W2978513038","doi":"10.22260/isarc2019/0010","title":"Identifying Moderation Effect between Project Delivery Systems and Cost Performance","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Moderation; Computer science; Causal model; Test (biology); Integrated project delivery; Project management; Engineering; Statistics; Systems engineering; Mathematics","score_opus":0.0786906251897722,"score_gpt":0.3333214074933212,"score_spread":0.25463078230354896,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2978513038","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9827017,0.00075369515,0.008825352,0.00096126704,0.00014418393,0.0003472012,0.0006070046,0.000052646494,0.0056068446],"genre_scores_gemma":[0.9953661,0.00016328818,0.0026590077,0.00011374376,0.000031553405,0.0004282447,0.00038339017,0.000020605752,0.0008342096],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9833627,0.010649998,0.0009848495,0.0017446432,0.002070077,0.0011878036],"domain_scores_gemma":[0.8696564,0.10597684,0.009563363,0.004690531,0.0070494376,0.0030634636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017167341,0.00086952525,0.0007863243,0.0016346237,0.0009588174,0.0019727508,0.0008507712,0.00074274844,0.00874839],"category_scores_gemma":[0.072469346,0.00043215067,0.0018358425,0.0014818488,0.00084463594,0.0020637733,0.003615917,0.0020603018,0.00062320294],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009478301,0.0005913663,0.95222497,0.00057916297,0.0013355067,0.00013069152,0.0041294866,0.0008749451,0.0011646176,0.004139861,0.0013753239,0.03250617],"study_design_scores_gemma":[0.00018218685,0.0013493669,0.9677137,0.0006212802,0.0021951299,0.0000877422,0.005776531,0.007963437,0.0035059545,0.004294068,0.0062513724,0.000059224003],"about_ca_topic_score_codex":0.0028612155,"about_ca_topic_score_gemma":0.00256833,"teacher_disagreement_score":0.017167341,"about_ca_system_score_codex":0.0014505639,"about_ca_system_score_gemma":0.0028666789,"threshold_uncertainty_score":0.09079069},"labels":[],"label_agreement":null},{"id":"W2981894233","doi":"","title":"A Brief Appraisal and Analysis of Existing Practices in the Contracts of Infrastructure Projects of Indian Railways","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering Technology & Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Procurement; Call for bids; Bidding; Work (physics); Business; Context (archaeology); Project management; Contract management; Process management; Operations management; Engineering; Marketing","score_opus":0.043377019985130105,"score_gpt":0.3442937343776903,"score_spread":0.3009167143925602,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2981894233","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87535274,0.022491755,0.00567215,0.006094565,0.0001948438,0.00027953318,0.00056158943,0.000049393977,0.08930338],"genre_scores_gemma":[0.97217846,0.017186187,0.0029364983,0.00021386892,0.000070307484,0.00006693386,0.00028117123,0.000014415454,0.007052131],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99305266,0.00226835,0.00073072803,0.00029670572,0.0028198753,0.0008316605],"domain_scores_gemma":[0.9856091,0.0064871893,0.0027537956,0.0005734159,0.0038924844,0.0006839407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041834894,0.00019216226,0.000166679,0.0053007933,0.0031386246,0.004498448,0.00083867874,0.000512306,0.002040975],"category_scores_gemma":[0.010527288,0.00023699403,0.0002581324,0.017140482,0.0019286512,0.0020770323,0.001200049,0.0008467214,0.0002590362],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017866395,0.00037436164,0.14077275,0.0039871177,0.000043844077,0.003674804,0.23348375,0.0022393193,0.0039203833,0.10951537,0.010088004,0.49172163],"study_design_scores_gemma":[0.0000035312441,0.00037674364,0.44517127,0.0023877819,0.000045417743,0.0021407176,0.30811867,0.0017348024,0.0012677461,0.0037429945,0.23491864,0.000091601934],"about_ca_topic_score_codex":0.019420695,"about_ca_topic_score_gemma":0.03444182,"teacher_disagreement_score":0.019420695,"about_ca_system_score_codex":0.0071058418,"about_ca_system_score_gemma":0.0066245776,"threshold_uncertainty_score":0.051556706},"labels":[],"label_agreement":null},{"id":"W2982358567","doi":"10.1061/(asce)co.1943-7862.0001736","title":"Machine Learning Algorithms for Construction Projects Delay Risk Prediction","year":2019,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":310,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Machine learning; Computer science; Artificial intelligence; Decision tree; Bayesian network; Set (abstract data type); Interdependence; Online machine learning; Data mining; Algorithm; Active learning (machine learning)","score_opus":0.022075671519458776,"score_gpt":0.27010243698121705,"score_spread":0.24802676546175828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2982358567","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04701467,0.0019840938,0.9472312,0.00083382684,0.00008921617,0.00013287467,0.0002965218,0.000716405,0.0017013368],"genre_scores_gemma":[0.70360506,0.0015569695,0.2903487,0.0002610522,0.00019162004,0.0004621257,0.0011313682,0.00005176937,0.002391301],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984939,0.0007230692,0.0001559193,0.00024204752,0.00026433653,0.0001206577],"domain_scores_gemma":[0.9926925,0.005743402,0.00044441927,0.00019114582,0.0008285207,0.000100004494],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045340457,0.0009334774,0.0013978593,0.0017605042,0.00056161144,0.001501499,0.0013485728,0.0014872093,0.0012380476],"category_scores_gemma":[0.011649569,0.00042514474,0.00079069054,0.0018009852,0.00045667772,0.0012180993,0.0008843161,0.0023334015,0.00047698483],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006453077,0.00014542509,0.0033663556,0.0001008501,0.00006421142,0.000042634783,0.000056242072,0.87640995,0.0003228656,0.004355881,0.0013076925,0.113763295],"study_design_scores_gemma":[0.0000029416385,0.0000131383,0.00021134412,0.000009722153,0.0000037988063,0.0000049159266,0.000008855396,0.9963027,0.000087201064,0.003190019,0.00016138784,0.000003905245],"about_ca_topic_score_codex":0.00803505,"about_ca_topic_score_gemma":0.0046109837,"teacher_disagreement_score":0.00803505,"about_ca_system_score_codex":0.001123374,"about_ca_system_score_gemma":0.0017515596,"threshold_uncertainty_score":0.02397865},"labels":[],"label_agreement":null},{"id":"W2989580318","doi":"10.1177/8756972819866577","title":"A Method for Risk Response Planning in Project Portfolio Management","year":2019,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":62,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Project portfolio management; Risk analysis (engineering); Portfolio; Interdependence; Computer science; Risk management; Risk management plan; Application portfolio management; Project management triangle; Project risk management; Key (lock); Set (abstract data type); Project management; Work (physics); Portfolio optimization; Operations research; Management science; Risk assessment; Business; Engineering; IT risk management; Systems engineering; Finance","score_opus":0.08691239229870767,"score_gpt":0.43647987920165976,"score_spread":0.3495674869029521,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2989580318","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00024266902,0.000054089953,0.9988557,0.000031797357,0.00001667613,0.000028334824,0.000015915859,0.00006870974,0.00068604684],"genre_scores_gemma":[0.020145448,0.00018053943,0.9777493,0.000039954484,0.000033307824,0.0003395801,0.000066594715,0.000075572825,0.0013697378],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9981559,0.00082274457,0.00010673257,0.00027906086,0.00056561286,0.00007005818],"domain_scores_gemma":[0.99836963,0.0010808716,0.00012234086,0.00011331818,0.00027200163,0.000041886684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030160975,0.0013284512,0.0010249487,0.0019248503,0.000782013,0.0013369501,0.001333591,0.0011201921,0.0053179306],"category_scores_gemma":[0.0052336804,0.0008055791,0.0014868489,0.0018848196,0.000807571,0.0014575842,0.0012032058,0.0017948544,0.0012489614],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000075451404,0.00009168535,0.0005401145,0.00028875304,0.000119569864,0.00011604205,0.00017077276,0.5641455,0.004503118,0.10974004,0.005488066,0.31472087],"study_design_scores_gemma":[0.000023551083,0.000041324412,0.0001254958,0.000042618307,0.000026324773,0.00007118753,0.000016797221,0.96056783,0.0012808234,0.028883815,0.008896042,0.000024271902],"about_ca_topic_score_codex":0.0030711738,"about_ca_topic_score_gemma":0.0025833002,"teacher_disagreement_score":0.0053179306,"about_ca_system_score_codex":0.0010753707,"about_ca_system_score_gemma":0.0017681303,"threshold_uncertainty_score":0.017790258},"labels":[],"label_agreement":null},{"id":"W2990559493","doi":"10.5539/jms.v9n2p90","title":"Factors That Stimulate Project Managers to Consider Sustainability; Exploring the Stimulus Patterns of Canadian Project Managers","year":2019,"lang":"en","type":"article","venue":"Journal of Management and Sustainability","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Sustainability; Project sponsorship; Project management; Project stakeholder; Business; Project charter; Normative; Project planning; Project management triangle; Marketing; Knowledge management; Political science; Management; Economics; Computer science; Ecology","score_opus":0.12924531431652592,"score_gpt":0.3585490760580912,"score_spread":0.2293037617415653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2990559493","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9943455,0.00009184595,0.00010560149,0.00023572036,0.000003928442,0.000046976667,0.000041798572,0.0000039883466,0.00512463],"genre_scores_gemma":[0.9986431,0.00015060187,0.00032383812,0.000068218986,0.0000017337939,0.00003551038,0.0000407153,0.0000025680936,0.0007336359],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99729174,0.00080317067,0.00014012227,0.00017191438,0.0010062731,0.0005867342],"domain_scores_gemma":[0.9931947,0.0020269412,0.0012635943,0.00018355413,0.0020492328,0.0012820256],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034224244,0.0002651547,0.00024910684,0.0017426733,0.003395089,0.002134441,0.0006349761,0.0005791456,0.0014071628],"category_scores_gemma":[0.011584404,0.0003045372,0.00025897744,0.002163774,0.0017803091,0.0005805696,0.0021293894,0.00070559286,0.000103079314],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035765744,0.0002966811,0.58435035,0.00058969884,0.000060825714,0.0008982136,0.3409111,0.00027652245,0.011246313,0.0036193673,0.0025391225,0.0548542],"study_design_scores_gemma":[0.000009726659,0.000078410594,0.7678827,0.00008445564,0.0000140651255,0.000086813234,0.22357798,0.00026712756,0.0006993904,0.00023356699,0.007015649,0.00005011998],"about_ca_topic_score_codex":0.58394134,"about_ca_topic_score_gemma":0.79950696,"teacher_disagreement_score":0.41605866,"about_ca_system_score_codex":0.011723118,"about_ca_system_score_gemma":0.020248843,"threshold_uncertainty_score":0.83701783},"labels":[],"label_agreement":null},{"id":"W2992333321","doi":"10.1016/j.ijproman.2019.09.007","title":"Project governance and its role in enabling organizational strategy implementation: A systematic literature review","year":2019,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":151,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Institute of Infection and Immunity; FURTHERMORE grants in publishing","keywords":"Project governance; Corporate governance; Systematic review; Typology; Project charter; Project management; Process management; Knowledge management; Field (mathematics); Business; Management science; Political science; Project management triangle; Engineering; Sociology; Computer science; Systems engineering","score_opus":0.03513935301856388,"score_gpt":0.37972538054594746,"score_spread":0.3445860275273836,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2992333321","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013030005,0.98368037,0.00064228877,0.0008453922,0.000081998995,0.00062958023,0.0003297332,0.000006785218,0.00075381575],"genre_scores_gemma":[0.1312866,0.8633881,0.002986408,0.0009145579,0.00006450653,0.00096546736,0.00026649112,0.00000771614,0.00012019945],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9825022,0.0074772546,0.00572816,0.001012168,0.0027225718,0.000557655],"domain_scores_gemma":[0.87382543,0.10229507,0.014610796,0.0017937812,0.0064157997,0.0010590558],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.031934567,0.00089549826,0.0036974153,0.0148235895,0.0009810765,0.0048487773,0.0013711642,0.0024817348,0.0029020137],"category_scores_gemma":[0.08887649,0.0012352573,0.0043603363,0.014576618,0.002186423,0.0046169204,0.0025840374,0.0016415212,0.00019411428],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034397963,0.0002097292,0.018485067,0.8095952,0.009341254,0.00044529853,0.0038757634,0.00031710853,0.00031180168,0.0020733215,0.0017077838,0.15329356],"study_design_scores_gemma":[0.00020730274,0.0003269623,0.02559037,0.9124207,0.034771483,0.00070169487,0.0051591108,0.00021563539,0.0002625002,0.0010789284,0.019186432,0.000078697274],"about_ca_topic_score_codex":0.010301288,"about_ca_topic_score_gemma":0.043702602,"teacher_disagreement_score":0.031934567,"about_ca_system_score_codex":0.004501708,"about_ca_system_score_gemma":0.036135416,"threshold_uncertainty_score":0.16888821},"labels":[],"label_agreement":null},{"id":"W2992417228","doi":"10.1139/cjce-2019-0308","title":"Dynamic stakeholder salience mapping framework for highway route alignment decisions: China–Pakistan Economic Corridor as a case study","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Natural Science Foundation of China","keywords":"Stakeholder; Stakeholder analysis; Salience (neuroscience); Business; Project stakeholder; Process management; Framing (construction); Project management; Environmental resource management; Project management triangle; Computer science; Project charter; Public relations; Political science; Economics; Engineering","score_opus":0.05284078175341905,"score_gpt":0.31335117552719594,"score_spread":0.2605103937737769,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2992417228","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.51189613,0.0011988465,0.42039913,0.003585591,0.00006154639,0.0016548707,0.00069233944,0.00015153778,0.060359955],"genre_scores_gemma":[0.88447213,0.0003669098,0.11292397,0.000060186863,0.000009406776,0.00038992203,0.00016548586,0.000008783378,0.0016031979],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982261,0.0010891965,0.00008351768,0.00018211605,0.00024815684,0.00017091032],"domain_scores_gemma":[0.9983298,0.0009623016,0.00023109725,0.00006205406,0.00027243185,0.00014231949],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002904928,0.00079373555,0.00029955464,0.0042346525,0.0021632253,0.0029626528,0.0009990337,0.00096807594,0.003700531],"category_scores_gemma":[0.003621142,0.0003160073,0.00071140495,0.0034438237,0.0016676164,0.0027803446,0.0024918884,0.00084838836,0.00016925785],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022340435,0.00069630047,0.10470786,0.0015176791,0.00019022521,0.008577044,0.058759477,0.09840696,0.0061787516,0.44054142,0.0070290095,0.27317184],"study_design_scores_gemma":[0.000071974646,0.0003147146,0.057128005,0.0010848219,0.0002567844,0.001979973,0.16620544,0.5731079,0.002774212,0.14099745,0.05587689,0.00020184823],"about_ca_topic_score_codex":0.018398046,"about_ca_topic_score_gemma":0.03236872,"teacher_disagreement_score":0.018398046,"about_ca_system_score_codex":0.0038346157,"about_ca_system_score_gemma":0.004560915,"threshold_uncertainty_score":0.036581933},"labels":[],"label_agreement":null},{"id":"W2992459549","doi":"10.1016/j.ijproman.2019.09.008","title":"A grounded theory examination of project managers' accountability","year":2019,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":44,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Accountability; Grounded theory; Reflexivity; Snowball sampling; Public relations; Business; Political science; Sociology; Process management; Qualitative research; Social science","score_opus":0.0658936160230841,"score_gpt":0.39541740468275327,"score_spread":0.32952378865966914,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2992459549","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7565956,0.0003375806,0.08068713,0.015937855,0.0001226354,0.00037147626,0.00009271415,0.00005777295,0.14579716],"genre_scores_gemma":[0.995688,0.000041046984,0.00379273,0.000112295704,0.000004166164,0.000053999618,0.000010046399,0.000005994998,0.00029170045],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.97072494,0.022737281,0.0005474094,0.0009284822,0.004136623,0.0009253132],"domain_scores_gemma":[0.7957405,0.18196192,0.007928229,0.005735864,0.0075146444,0.0011187528],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.034260403,0.00040534785,0.00035746527,0.003751872,0.0033863669,0.006755646,0.0018174354,0.001391297,0.0024991657],"category_scores_gemma":[0.09638018,0.0003733373,0.00033312186,0.0029229382,0.01156441,0.006267241,0.002987978,0.0026379153,0.00015156738],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019008756,0.00029413163,0.019052675,0.00023486698,0.00005094287,0.00018137867,0.14622702,0.0014813279,0.0006923851,0.77921236,0.001110633,0.051272303],"study_design_scores_gemma":[0.0002186,0.0003731286,0.04160122,0.0010994578,0.00014371307,0.0001858585,0.23521794,0.029740946,0.0033363642,0.6711421,0.016873915,0.00006671331],"about_ca_topic_score_codex":0.006902851,"about_ca_topic_score_gemma":0.0065103364,"teacher_disagreement_score":0.034260403,"about_ca_system_score_codex":0.009418176,"about_ca_system_score_gemma":0.010303514,"threshold_uncertainty_score":0.18118852},"labels":[],"label_agreement":null},{"id":"W2994018677","doi":"10.2175/193864704784147223","title":"Development of a Quantitative Approach to Incorporating Stakeholder Values into Total Maximum Daily Loads: Dominquez Channel Case Study","year":2004,"lang":"en","type":"article","venue":"Proceedings of the Water Environment Federation","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Lawrence Livermore National Laboratory; Bayer Canada; Ministerio de Economía y Competitividad; University of Cambridge; U.S. Environmental Protection Agency; U.S. Department of Energy","keywords":"Channel (broadcasting); Stakeholder; Environmental science; Computer science; Economics; Telecommunications; Management","score_opus":0.10371162605200893,"score_gpt":0.30307251743061414,"score_spread":0.19936089137860522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2994018677","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53637815,0.0003548742,0.37359476,0.002685751,0.000036718477,0.0011759329,0.0014481565,0.00024010547,0.084085636],"genre_scores_gemma":[0.8379339,0.00022485449,0.15670513,0.0001240582,0.00001194891,0.0004650921,0.00023183356,0.000034926208,0.004268163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99695814,0.002175681,0.00006644225,0.0001725927,0.00043305135,0.00019405932],"domain_scores_gemma":[0.99499196,0.0037088068,0.00022815024,0.0001982109,0.00073028996,0.0001426417],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00604829,0.00075188826,0.00035630647,0.0020734456,0.0014220191,0.0024857563,0.0018432443,0.001098786,0.0026306303],"category_scores_gemma":[0.008533665,0.00040083667,0.0007890351,0.0022224276,0.0013359281,0.0024633189,0.002111199,0.001122044,0.00011194839],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018285264,0.0010151551,0.042312413,0.00031482324,0.00011530447,0.0013694627,0.0027304168,0.5942923,0.0030295895,0.29726154,0.0036011904,0.05377506],"study_design_scores_gemma":[0.00004385631,0.00016309987,0.004640016,0.00007124674,0.000031343556,0.00010620958,0.0043356246,0.95575476,0.0014912931,0.025301958,0.008009601,0.00005091799],"about_ca_topic_score_codex":0.06588723,"about_ca_topic_score_gemma":0.08541462,"teacher_disagreement_score":0.06588723,"about_ca_system_score_codex":0.0068637193,"about_ca_system_score_gemma":0.0051676356,"threshold_uncertainty_score":0.13100743},"labels":[],"label_agreement":null},{"id":"W2995515005","doi":"10.1139/cjce-2019-0549","title":"Identification of critical risks in international engineering procurement construction projects of Chinese contractors from the network perspective","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Natural Science Foundation of China","keywords":"Risk management; Interdependence; Risk analysis (engineering); Procurement; Critical infrastructure protection; Risk assessment; Risk management plan; Business; IT risk management; Identification (biology); Critical infrastructure; Computer science; Computer security; Finance; Marketing","score_opus":0.028688407582844435,"score_gpt":0.3018175386340517,"score_spread":0.2731291310512073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2995515005","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9890492,0.00033251027,0.0036391483,0.00026097512,0.0000037148932,0.00007112855,0.00006360739,0.0000041342837,0.006575525],"genre_scores_gemma":[0.9984888,0.00025110904,0.00063676963,0.000008009767,0.0000022210058,0.000028546185,0.000046238976,0.0000011320153,0.0005371924],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99784803,0.0007148855,0.00017874352,0.00017662454,0.00074609555,0.00033555285],"domain_scores_gemma":[0.9956456,0.001723317,0.0014213683,0.00012196773,0.00072831474,0.00035953763],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024414756,0.000363461,0.0002393934,0.005061384,0.0018518355,0.002096208,0.00044220983,0.0005552547,0.0016429017],"category_scores_gemma":[0.006196075,0.00022782836,0.0003182267,0.0035790727,0.0009538947,0.0024306353,0.0021047406,0.00037529276,0.00008352288],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002379114,0.00019542009,0.7667804,0.00059408206,0.00015234534,0.0028595363,0.074477896,0.014468393,0.0025160261,0.026991084,0.0011146808,0.10961223],"study_design_scores_gemma":[0.00001814026,0.00027764525,0.75547826,0.0004613103,0.0002480429,0.0013188577,0.16653828,0.042904444,0.0019034097,0.016114695,0.0146142235,0.00012259345],"about_ca_topic_score_codex":0.023610054,"about_ca_topic_score_gemma":0.026812784,"teacher_disagreement_score":0.023610054,"about_ca_system_score_codex":0.004022419,"about_ca_system_score_gemma":0.0038354555,"threshold_uncertainty_score":0.046945274},"labels":[],"label_agreement":null},{"id":"W2995834843","doi":"10.1108/jocm-10-2018-0288","title":"Deriving significant factors for managing change in UN","year":2019,"lang":"en","type":"article","venue":"Journal of Organizational Change Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; International Civil Aviation Organization","funders":"","keywords":"Confirmatory factor analysis; Originality; Exploratory factor analysis; Mandate; Public sector; Agency (philosophy); Change management (ITSM); Private sector; Value (mathematics); Psychology; Public relations; Knowledge management; Political science; Sociology; Business; Marketing; Social psychology; Computer science","score_opus":0.13875390973602794,"score_gpt":0.3505189669097709,"score_spread":0.21176505717374297,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2995834843","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87687206,0.0014232731,0.03436415,0.0069531524,0.00022631878,0.0023413205,0.00041684913,0.0001861809,0.07721667],"genre_scores_gemma":[0.9841942,0.00048389245,0.013660344,0.00021799345,0.000016352285,0.0003135557,0.00011903082,0.000016073667,0.000978565],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9910143,0.0044606864,0.00085375906,0.0006933827,0.001981331,0.000996575],"domain_scores_gemma":[0.95620024,0.030589486,0.004973614,0.00164872,0.0048068105,0.0017812037],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008929853,0.00074495515,0.00053244445,0.003985888,0.0038561984,0.0063096476,0.0008270429,0.0011381692,0.005245548],"category_scores_gemma":[0.04277369,0.00038844752,0.0010328586,0.0030727056,0.0040724482,0.0046409382,0.0037259634,0.0019684797,0.00035042223],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019073489,0.0008663585,0.5184211,0.0022989595,0.000200918,0.00091914675,0.121130876,0.001867067,0.0011259377,0.061396513,0.006215573,0.2853669],"study_design_scores_gemma":[0.00005110805,0.00078728003,0.5347938,0.0041101407,0.000549598,0.00092784263,0.34519127,0.012136348,0.0035522638,0.054351944,0.04335403,0.00019442035],"about_ca_topic_score_codex":0.006688978,"about_ca_topic_score_gemma":0.010165215,"teacher_disagreement_score":0.008929853,"about_ca_system_score_codex":0.006637,"about_ca_system_score_gemma":0.01144627,"threshold_uncertainty_score":0.04815507},"labels":[],"label_agreement":null},{"id":"W2999757807","doi":"10.1108/ijmpb-07-2019-0170","title":"Project management resources and outcomes: a confirmatory factor analysis","year":2020,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"","keywords":"Exploratory factor analysis; Project management; Confirmatory factor analysis; Project management triangle; Knowledge management; Originality; Competitive advantage; OPM3; Context (archaeology); Project portfolio management; Process management; Computer science; Structural equation modeling; Business; Marketing; Qualitative research; Sociology; Economics; Management","score_opus":0.09856309673365989,"score_gpt":0.37673153237416246,"score_spread":0.2781684356405026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2999757807","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96031415,0.00010976474,0.025860766,0.0005314881,0.000040273924,0.003080453,0.0011494111,0.00010356866,0.008810193],"genre_scores_gemma":[0.97809964,0.000087361776,0.017408155,0.00007499162,0.000015708218,0.002369622,0.000952239,0.000034481785,0.00095776404],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9889748,0.0054940493,0.0007291077,0.0007308913,0.0034962525,0.00057488424],"domain_scores_gemma":[0.9536948,0.022536159,0.0025877387,0.0037464441,0.016600275,0.0008345881],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.023246499,0.00077543757,0.0007220064,0.002785907,0.0012773357,0.0019069187,0.00059536507,0.00039898008,0.003153146],"category_scores_gemma":[0.0496804,0.00033049757,0.0012377228,0.0029172865,0.0010698752,0.0011637815,0.0012724821,0.0011811627,0.0006798976],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005871572,0.0020885263,0.73722833,0.0006073641,0.0003567664,0.00042626515,0.020153109,0.0026106816,0.0028939846,0.005521998,0.003360066,0.22416563],"study_design_scores_gemma":[0.00028583672,0.0022553387,0.9402768,0.00067647634,0.00045273986,0.00031518863,0.019565545,0.018228538,0.0048674447,0.0052478216,0.007734368,0.00009381019],"about_ca_topic_score_codex":0.005780463,"about_ca_topic_score_gemma":0.004961621,"teacher_disagreement_score":0.023246499,"about_ca_system_score_codex":0.0011017392,"about_ca_system_score_gemma":0.0072482876,"threshold_uncertainty_score":0.12294072},"labels":[],"label_agreement":null},{"id":"W3000450464","doi":"10.5539/cis.v13n1p34","title":"Evaluation of Scientific Research Based on Key Performance Indicators (KPIs): A Case Study in Al-Imam Mohammad Ibn Saud Islamic University","year":2020,"lang":"en","type":"article","venue":"Computer and Information Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Imam Mohammed Ibn Saud Islamic University","keywords":"Performance indicator; Christian ministry; Government (linguistics); Islam; Quality (philosophy); Higher education; Skepticism; Computer science; Business; Accounting; Political science; Marketing; Law","score_opus":0.18951742693812512,"score_gpt":0.4058905461360733,"score_spread":0.21637311919794816,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3000450464","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":"evaluation","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":"evaluation","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96567595,0.0014711609,0.0039683427,0.007297859,0.00007446013,0.00063191896,0.000079186,0.00002907301,0.020771991],"genre_scores_gemma":[0.9905813,0.0013800727,0.004567049,0.00033840557,0.00003442161,0.0001395026,0.000044110886,0.00001525752,0.0028999671],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9694764,0.01899971,0.002041106,0.0008292579,0.006483047,0.0021704512],"domain_scores_gemma":[0.94062513,0.03371416,0.0048250607,0.0017888703,0.012122407,0.006924379],"candidate_categories":["metaresearch","bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.036891676,0.00040843096,0.0006367338,0.003957102,0.00795046,0.008920599,0.0014710755,0.0025776864,0.0024093173],"category_scores_gemma":[0.033466365,0.0003376255,0.0007023531,0.004955074,0.0034627884,0.0038957812,0.0037288528,0.0022629285,0.00054948364],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011564697,0.008333129,0.19165096,0.003988919,0.00025809312,0.059734974,0.33585298,0.007129521,0.010993822,0.06214055,0.020180812,0.2985798],"study_design_scores_gemma":[0.00016673518,0.0030777415,0.08566562,0.0019692774,0.00017529077,0.00932211,0.7400665,0.010714503,0.011169273,0.009449026,0.12795854,0.0002654572],"about_ca_topic_score_codex":0.004611443,"about_ca_topic_score_gemma":0.009229157,"teacher_disagreement_score":0.9960429,"about_ca_system_score_codex":0.010867566,"about_ca_system_score_gemma":0.012370128,"threshold_uncertainty_score":0.19510418},"labels":[],"label_agreement":null},{"id":"W3002976962","doi":"10.4018/978-1-7998-1934-9.ch010","title":"Project-Based Organizations","year":2020,"lang":"en","type":"book-chapter","venue":"Advances in logistics, operations, and management science book series","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Project charter; Project management; Knowledge management; Project management triangle; Business; Project stakeholder; Order (exchange); Project manager; Interface (matter); Process management; Computer science; Engineering; Systems engineering","score_opus":0.04777129959015354,"score_gpt":0.33973125356900863,"score_spread":0.2919599539788551,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3002976962","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0027729925,0.0059557077,0.0077068433,0.0013965082,0.0004861465,0.00017961461,0.00023911997,0.00025138812,0.9810116],"genre_scores_gemma":[0.052662626,0.010203232,0.009972655,0.0009279058,0.00025139353,0.0003220531,0.0010207514,0.00017207564,0.9244673],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99879813,0.00032514863,0.000052856896,0.00016138355,0.0004894735,0.0001729589],"domain_scores_gemma":[0.9991105,0.0001510339,0.00006497603,0.0001545759,0.00022705439,0.00029179672],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007333932,0.0006486276,0.00021388428,0.001185014,0.0019536484,0.0071188635,0.0010831795,0.0009174534,0.09382962],"category_scores_gemma":[0.0016480938,0.00028703574,0.00017868365,0.0032079923,0.0012781754,0.0036024558,0.0038089482,0.0014320047,0.027073883],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008335304,0.00008066841,0.00037259806,0.00018781237,0.000004642429,0.000115214774,0.0025116587,0.0002534893,0.0003872689,0.55250096,0.24322633,0.20035096],"study_design_scores_gemma":[0.0000018853226,0.000009083243,0.00019403464,0.000070059556,6.177671e-7,0.000085577536,0.00035895492,0.00005752833,0.000044895325,0.010422778,0.9887524,0.0000023105822],"about_ca_topic_score_codex":0.0014564535,"about_ca_topic_score_gemma":0.003271202,"teacher_disagreement_score":0.09382962,"about_ca_system_score_codex":0.0021171172,"about_ca_system_score_gemma":0.002037913,"threshold_uncertainty_score":0.31389135},"labels":[],"label_agreement":null},{"id":"W3003591222","doi":"10.3311/ccc2019-027","title":"Toward a Qualitative RFIs Content Analysis Approach to Improve Collaboration Between Design and Construction Phases","year":2019,"lang":"en","type":"article","venue":"Proceedings of the Creative Construction Conference 2019","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Content (measure theory); Content analysis; Data science; Management science; Engineering; Mathematics; Sociology","score_opus":0.19605818118728063,"score_gpt":0.3792943478014002,"score_spread":0.18323616661411957,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3003591222","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022627365,0.0002885138,0.9490525,0.0034284662,0.00006926022,0.0017785986,0.00066824025,0.0004064295,0.021680592],"genre_scores_gemma":[0.19404362,0.00030597879,0.796172,0.00041408444,0.000028219461,0.0037911506,0.0006096276,0.00015206638,0.004483189],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.95638275,0.032851413,0.0016093907,0.002076473,0.0061440077,0.0009359853],"domain_scores_gemma":[0.9150233,0.055827875,0.0052207895,0.0054450384,0.017317468,0.0011655536],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.038551398,0.0014525848,0.0010541606,0.0140730515,0.0045794924,0.010325472,0.0034855236,0.0018427839,0.0053244215],"category_scores_gemma":[0.052923117,0.0010711724,0.0013003543,0.009401361,0.008721393,0.010705377,0.0069164983,0.0021762538,0.0010373342],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029693104,0.00044462268,0.008943261,0.0029116094,0.00013383455,0.00060674583,0.21573648,0.007277837,0.010875849,0.47026348,0.006486436,0.27602294],"study_design_scores_gemma":[0.0001852281,0.00033577124,0.0092763975,0.0032592248,0.00019293399,0.0004935658,0.26300874,0.05365714,0.023443539,0.4962115,0.14968927,0.00024671666],"about_ca_topic_score_codex":0.0092793815,"about_ca_topic_score_gemma":0.010075361,"teacher_disagreement_score":0.038551398,"about_ca_system_score_codex":0.015606816,"about_ca_system_score_gemma":0.01925829,"threshold_uncertainty_score":0.20388174},"labels":[],"label_agreement":null},{"id":"W3003789626","doi":"10.25777/ayn8-am85","title":"Multi-National Project Team Communications and Cultural Influences","year":2019,"lang":"en","type":"article","venue":"ODU Digital Commons (Old Dominion University)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Political science; Public relations; Computer science; Telecommunications","score_opus":0.11661954774792312,"score_gpt":0.3468048768159505,"score_spread":0.2301853290680274,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3003789626","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9891122,0.00012139015,0.0014115035,0.00021814664,0.000018649313,0.00002728429,0.000010588074,0.0000063383777,0.00907382],"genre_scores_gemma":[0.9992612,0.000084280095,0.00028092295,0.000029388755,0.000004536121,0.000019350842,0.0000057269203,0.0000037570385,0.00031091063],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.98801255,0.008653694,0.0005393927,0.0005522728,0.0013983906,0.0008436829],"domain_scores_gemma":[0.9820722,0.0095427185,0.0035706584,0.00087300444,0.0021691862,0.0017722205],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006958683,0.0002631608,0.0002466191,0.0010430347,0.0037782462,0.004575786,0.0006863968,0.00037511715,0.0019701612],"category_scores_gemma":[0.020025931,0.00024285862,0.00026780792,0.0012160515,0.002573688,0.0018357395,0.004405405,0.0008644311,0.00015745309],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025134388,0.0003156006,0.4622678,0.00036046587,0.00015139679,0.003347082,0.42764652,0.0017481316,0.0019700616,0.008998311,0.001021789,0.09192161],"study_design_scores_gemma":[0.000011951718,0.00021390131,0.16550873,0.00021987993,0.000058229274,0.0011027368,0.8190029,0.0014974781,0.0010598436,0.0017654113,0.009514276,0.000044599466],"about_ca_topic_score_codex":0.0039854846,"about_ca_topic_score_gemma":0.007065739,"teacher_disagreement_score":0.006958683,"about_ca_system_score_codex":0.0017987876,"about_ca_system_score_gemma":0.0024917116,"threshold_uncertainty_score":0.036801457},"labels":[],"label_agreement":null},{"id":"W3005434831","doi":"10.36680/j.itcon.2020.005","title":"Risk quantification using fuzzy-based Monte Carlo simulation","year":2020,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Monte Carlo method; Cost estimate; Cost contingency; Computer science; Variance (accounting); Contingency; Contingency table; Fuzzy logic; Covariance matrix; Estimation; Data mining; Econometrics; Operations research; Reliability engineering; Statistics; Mathematical optimization; Algorithm; Mathematics; Engineering; Machine learning; Artificial intelligence","score_opus":0.07772291270651605,"score_gpt":0.3542710614909876,"score_spread":0.27654814878447154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3005434831","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02677747,0.00015557984,0.97006565,0.000075363685,0.000015522066,0.00009452679,0.0000614021,0.00018491622,0.0025695073],"genre_scores_gemma":[0.75462097,0.00028800976,0.24311367,0.000038828923,0.000024694915,0.0003495063,0.000117037016,0.000038257458,0.0014089852],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985024,0.0007157678,0.00009411224,0.00013711178,0.00045536016,0.00009525039],"domain_scores_gemma":[0.99229926,0.006245697,0.00041274627,0.0002632835,0.0006894966,0.00008957317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003419628,0.00069677463,0.0011932191,0.0021695793,0.00071327103,0.0015958133,0.0012092002,0.0013513499,0.002497096],"category_scores_gemma":[0.008264763,0.0004743381,0.0011282112,0.0013752085,0.000769576,0.0011254761,0.0008891683,0.00095551246,0.00016125925],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013123985,0.000009195174,0.00026432498,0.00001446364,0.000013434903,0.000016771974,0.000015096827,0.9914392,0.00014230736,0.004420228,0.00005049934,0.0036013788],"study_design_scores_gemma":[0.0000012681478,0.0000034496065,0.000045053723,0.000003067149,0.0000020974164,0.000004615745,0.0000028751192,0.998706,0.00007185413,0.0011027389,0.000053899104,0.0000030880021],"about_ca_topic_score_codex":0.013270785,"about_ca_topic_score_gemma":0.008138273,"teacher_disagreement_score":0.013270785,"about_ca_system_score_codex":0.001735004,"about_ca_system_score_gemma":0.0013827729,"threshold_uncertainty_score":0.026387095},"labels":[],"label_agreement":null},{"id":"W3006753349","doi":"10.1061/(asce)la.1943-4170.0000388","title":"Characteristics of Stipends and Their Value-Adding Potential in Design-Build US Highway Construction","year":2020,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Stipend; Procurement; Agency (philosophy); Competition (biology); Process (computing); Work (physics); Value (mathematics); Funding Agency; Business; Finance; Computer science; Engineering; Marketing","score_opus":0.01878310457725002,"score_gpt":0.24162751872273613,"score_spread":0.2228444141454861,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3006753349","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9724114,0.00013964208,0.0030553401,0.00036734305,0.000010342693,0.00012821244,0.000059034195,0.000034710636,0.023794027],"genre_scores_gemma":[0.9966515,0.000051534415,0.0019781187,0.000021689199,0.000003853727,0.000049088878,0.000045449786,0.00001325384,0.0011855827],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9799239,0.011498259,0.0010938435,0.000645364,0.005176196,0.0016623439],"domain_scores_gemma":[0.91485417,0.05241378,0.013132289,0.0049796514,0.008929096,0.0056910748],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015880281,0.00019066657,0.00016965273,0.0019107969,0.0023689407,0.0047766776,0.0011735628,0.000821425,0.005809474],"category_scores_gemma":[0.07402233,0.00048540192,0.00031787134,0.0022197478,0.0022872242,0.0029277743,0.002884073,0.0011211172,0.00063005876],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00080006087,0.0015040357,0.66021186,0.00051333534,0.00008016051,0.000983323,0.058201548,0.0067617223,0.0058818418,0.052402847,0.0034296212,0.2092297],"study_design_scores_gemma":[0.000036159672,0.0008918971,0.8159099,0.00041304098,0.000048640853,0.0009429991,0.10783,0.0071944515,0.0034147156,0.017549122,0.045619957,0.00014901429],"about_ca_topic_score_codex":0.0030345658,"about_ca_topic_score_gemma":0.007002088,"teacher_disagreement_score":0.015880281,"about_ca_system_score_codex":0.004303826,"about_ca_system_score_gemma":0.0037628443,"threshold_uncertainty_score":0.08398396},"labels":[],"label_agreement":null},{"id":"W3007477532","doi":"10.5267/j.msl.2020.2.010","title":"Gaining a competitive advantage through strategic human resource management in Indonesian construction industry","year":2020,"lang":"en","type":"article","venue":"Management Science Letters","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universitas Mercu Buana; Lembaga Ilmu Pengetahuan Indonesia","keywords":"Indonesian; Competitive advantage; Business; Human resource management; Human resources; Strategic management; Resource (disambiguation); Industrial organization; Resource-based view; Knowledge management; Operations management; Marketing; Process management; Computer science; Management; Economics","score_opus":0.10797836137000655,"score_gpt":0.36243291442371395,"score_spread":0.2544545530537074,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3007477532","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9757953,0.00014038043,0.0008470242,0.000618597,0.0000063870407,0.00003221024,0.000009719236,0.0000035078726,0.022546766],"genre_scores_gemma":[0.9990754,0.0000842477,0.00035363418,0.000035725767,0.0000012254369,0.000007113951,0.000004578881,5.54362e-7,0.0004374702],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99892896,0.0004540516,0.000035096342,0.000062687235,0.00028917482,0.00023000539],"domain_scores_gemma":[0.99874336,0.0004309052,0.0003139008,0.000032331376,0.00017712086,0.00030233295],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015701415,0.00019797153,0.00014008819,0.0007100232,0.001059593,0.0023111238,0.00033418808,0.00029802124,0.0016976432],"category_scores_gemma":[0.0017120318,0.00010621758,0.000112091315,0.00063533324,0.0009862971,0.00087330816,0.00091500464,0.00048824766,0.00019175666],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026678885,0.003029953,0.7097155,0.0003838749,0.000070733215,0.0017429517,0.024260238,0.008540342,0.0035487409,0.039634153,0.003169606,0.20563716],"study_design_scores_gemma":[0.00007685608,0.0009190367,0.7996206,0.00040000555,0.00007234193,0.00081157737,0.113524444,0.05045087,0.0024421236,0.01362189,0.017979896,0.000080319725],"about_ca_topic_score_codex":0.007807954,"about_ca_topic_score_gemma":0.017034544,"teacher_disagreement_score":0.007807954,"about_ca_system_score_codex":0.0022715945,"about_ca_system_score_gemma":0.0038392541,"threshold_uncertainty_score":0.016481638},"labels":[],"label_agreement":null},{"id":"W3010568754","doi":"10.1139/cjce-2019-0739","title":"Modelling a cost profile for road projects","year":2020,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Johannesburg","keywords":"Transport engineering; Scope (computer science); Work (physics); Upgrade; Cost estimate; Road construction; Cost overrun; Data collection; Cost analysis; Cost database; Estimation; Engineering; Computer science; Construction engineering; Operations research; Systems engineering; Construction industry; Mathematics; Statistics","score_opus":0.10574320885527447,"score_gpt":0.2851926666412547,"score_spread":0.17944945778598023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3010568754","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.56504637,0.0007090469,0.40146992,0.0010022,0.000044269684,0.0006010881,0.0059095896,0.00049967883,0.02471779],"genre_scores_gemma":[0.9477412,0.0005448498,0.04440783,0.000028792383,0.000011562464,0.0002682104,0.002124197,0.00007915713,0.004794335],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99892575,0.0003323803,0.000092637034,0.00013618126,0.00033781567,0.00017515228],"domain_scores_gemma":[0.9970811,0.0014560292,0.0005642968,0.00014989814,0.0006437764,0.00010484605],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016806354,0.0006425272,0.00048278435,0.0029752192,0.00037141555,0.0028444808,0.0010764541,0.0010594603,0.002707971],"category_scores_gemma":[0.008577713,0.0005814421,0.00080668414,0.0032937871,0.00030438104,0.002301989,0.0006970884,0.0008125419,0.0007017596],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005499916,0.00005683525,0.016214244,0.00008319123,0.000026670123,0.00027970542,0.00027849432,0.94202614,0.00051523326,0.015616874,0.0013569145,0.023490647],"study_design_scores_gemma":[0.0000040997434,0.00002887672,0.005986541,0.000037774753,0.0000066932703,0.00013195389,0.00026185665,0.98768616,0.0002062472,0.0033710601,0.0022624177,0.000016390688],"about_ca_topic_score_codex":0.045439422,"about_ca_topic_score_gemma":0.029960243,"teacher_disagreement_score":0.045439422,"about_ca_system_score_codex":0.0031640143,"about_ca_system_score_gemma":0.0014171907,"threshold_uncertainty_score":0.09034985},"labels":[],"label_agreement":null},{"id":"W3011988108","doi":"10.1080/15623599.2020.1738205","title":"Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects","year":2020,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Knowledge extraction; Data mining; Cluster analysis; Cost overrun; Data science; Rough set; Engineering; Machine learning; Construction industry; Construction engineering","score_opus":0.0634758657941571,"score_gpt":0.37593325574207354,"score_spread":0.31245738994791644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3011988108","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44166526,0.0058213663,0.53456694,0.002892757,0.0002834506,0.0009110736,0.0030732113,0.0010799427,0.009705934],"genre_scores_gemma":[0.8459971,0.0021055157,0.1497328,0.00013533208,0.000048051257,0.00022175533,0.0011760406,0.000024798603,0.0005586456],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9950113,0.001612753,0.00068375614,0.0006924458,0.001759231,0.00024052315],"domain_scores_gemma":[0.98390293,0.010946875,0.0016497954,0.0010476563,0.0022749032,0.00017780972],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006563149,0.0007954885,0.0013510006,0.010790587,0.0010495121,0.0025120538,0.0016313678,0.0009593899,0.0006334767],"category_scores_gemma":[0.021261645,0.00052776985,0.0013351382,0.010846658,0.0005513676,0.0023502726,0.0015413939,0.0011099116,0.0002104514],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024889258,0.00090547703,0.1838854,0.0011428806,0.00090990216,0.0010027321,0.0009801892,0.23142195,0.0013436945,0.011072764,0.0055403677,0.5615457],"study_design_scores_gemma":[0.000051364746,0.00024813664,0.05076025,0.00027275644,0.0003321984,0.00067378266,0.00093907514,0.91671735,0.003330152,0.018623823,0.00793226,0.00011890532],"about_ca_topic_score_codex":0.016278835,"about_ca_topic_score_gemma":0.013473098,"teacher_disagreement_score":0.016278835,"about_ca_system_score_codex":0.0015771834,"about_ca_system_score_gemma":0.002584067,"threshold_uncertainty_score":0.034709632},"labels":[],"label_agreement":null},{"id":"W3021080851","doi":"10.3390/a13050115","title":"A Fuzzy-Based Decision Support Model for Risk Maturity Evaluation of Construction Organizations","year":2020,"lang":"en","type":"article","venue":"Algorithms","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Capability Maturity Model; Maturity (psychological); Interdependence; Ambiguity; Risk management; Risk analysis (engineering); Process (computing); Identification (biology); Computer science; Quality (philosophy); Process management; Fuzzy logic; Service Integration Maturity Model; Set (abstract data type); Business; Artificial intelligence","score_opus":0.12517312428090172,"score_gpt":0.3833211543716089,"score_spread":0.2581480300907072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3021080851","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05561269,0.00016144803,0.9378393,0.00053333543,0.000044626042,0.00023500991,0.00025832411,0.00017890893,0.0051362915],"genre_scores_gemma":[0.79194653,0.00030156446,0.20349354,0.00008905884,0.0000325444,0.00071937917,0.00028913986,0.00001967419,0.0031085273],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99862826,0.0006499328,0.00008207599,0.00021971589,0.00028130782,0.0001387537],"domain_scores_gemma":[0.9975007,0.001649439,0.0002095555,0.000045738114,0.0004922632,0.00010230076],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003191286,0.0009966105,0.0008959285,0.0018537617,0.0009943978,0.0025269648,0.0017705213,0.0018541596,0.0038510405],"category_scores_gemma":[0.005880038,0.00043699145,0.00096489274,0.0014531943,0.00067428435,0.0018510371,0.00095291284,0.0015202558,0.00032572792],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006694551,0.00006330704,0.00092709245,0.000050317634,0.000035635418,0.00008458002,0.00015573924,0.972816,0.00043788546,0.013311991,0.00031936698,0.011731054],"study_design_scores_gemma":[0.0000073136603,0.000020775493,0.000087670946,0.000008540487,0.000008211286,0.000007744734,0.000023421953,0.9964282,0.00007506936,0.003134748,0.00019255988,0.0000056924796],"about_ca_topic_score_codex":0.018146785,"about_ca_topic_score_gemma":0.011806131,"teacher_disagreement_score":0.018146785,"about_ca_system_score_codex":0.003491425,"about_ca_system_score_gemma":0.0026829524,"threshold_uncertainty_score":0.036082327},"labels":[],"label_agreement":null},{"id":"W3021718527","doi":"","title":"Putting the \"RT\" in redevelopment.","year":2017,"lang":"en","type":"article","venue":"PubMed","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Cambridge Memorial Hospital","funders":"","keywords":"Redevelopment; Operationalization; Process management; Business; Asset (computer security); Process (computing); Phase (matter); Operations management; Public relations; Political science; Environmental planning; Engineering; Computer science; Geography","score_opus":0.24435753946535657,"score_gpt":0.3711702546925874,"score_spread":0.12681271522723084,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3021718527","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21268567,0.0053979196,0.15891178,0.1099076,0.012819105,0.004889679,0.0010437986,0.0077260006,0.4866185],"genre_scores_gemma":[0.580585,0.0038853833,0.12959236,0.010892313,0.0009464141,0.0014832848,0.0012363305,0.0019905572,0.26938838],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98419636,0.00814888,0.00072028645,0.00082578964,0.004260296,0.0018483726],"domain_scores_gemma":[0.9684207,0.0034760535,0.0027057738,0.003809415,0.0057507455,0.015837342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016211143,0.0009460033,0.00038834498,0.0017405712,0.004304731,0.0056090066,0.002244845,0.002052031,0.059618667],"category_scores_gemma":[0.033909637,0.0006350569,0.0007357709,0.00087999395,0.0029806315,0.0046014315,0.00878497,0.004415053,0.021697946],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004998493,0.0010252927,0.013135675,0.00073049346,0.00007975798,0.0010834052,0.009161825,0.0020706495,0.004837949,0.02991577,0.2623176,0.67514175],"study_design_scores_gemma":[0.0001021809,0.001722017,0.018349018,0.0008354438,0.00006745377,0.0013669737,0.018972648,0.0022704226,0.004824632,0.019857468,0.931451,0.00018080011],"about_ca_topic_score_codex":0.0030349595,"about_ca_topic_score_gemma":0.0061809043,"teacher_disagreement_score":0.059618667,"about_ca_system_score_codex":0.0032463553,"about_ca_system_score_gemma":0.017218191,"threshold_uncertainty_score":0.1994443},"labels":[],"label_agreement":null},{"id":"W3021847602","doi":"10.11575/prism/37746","title":"Factors Impacting Cost Growth on Heavy Industrial Projects in Alberta","year":2020,"lang":"en","type":"dissertation","venue":"Open MIND","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering; Environmental science","score_opus":0.35498509344073614,"score_gpt":0.4382356452062917,"score_spread":0.08325055176555557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3021847602","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9984211,0.000045709945,0.00020715361,0.00003615089,0.000001020149,0.000011952525,0.00022185352,0.000006979636,0.0010480458],"genre_scores_gemma":[0.9982613,0.00011830486,0.0003106638,0.0000049127925,0.0000010903992,0.0000077623845,0.00037534206,0.0000031243994,0.00091752387],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9985447,0.00019340996,0.00006676335,0.00008678616,0.0008826932,0.00022572206],"domain_scores_gemma":[0.99446034,0.001313638,0.0015807908,0.00017172802,0.0019979829,0.00047542548],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001132985,0.00025663595,0.00018101929,0.0021463365,0.0007582703,0.0011771068,0.0007567191,0.00024079757,0.00093617756],"category_scores_gemma":[0.005554709,0.00022125873,0.00019492146,0.0034926112,0.00066562457,0.00035075596,0.0007286873,0.00035058896,0.00012314679],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063485415,0.00006755365,0.9721504,0.000032869277,0.000024852736,0.00031770568,0.001057185,0.0069506136,0.00073593605,0.00028460438,0.00035744006,0.017957373],"study_design_scores_gemma":[8.7917795e-7,0.000028732486,0.9959848,0.000007689501,0.0000036349384,0.000034284774,0.0014564395,0.0018799894,0.00010999739,0.000041319694,0.00044693798,0.0000054201246],"about_ca_topic_score_codex":0.71216047,"about_ca_topic_score_gemma":0.8721962,"teacher_disagreement_score":0.28783953,"about_ca_system_score_codex":0.009302842,"about_ca_system_score_gemma":0.0071486924,"threshold_uncertainty_score":0.5790693},"labels":[],"label_agreement":null},{"id":"W3021975659","doi":"10.1139/cjce-2019-0471","title":"Simulation of design changes impact in healthcare construction projects using system dynamics","year":2020,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Systems engineering; Computer science; System dynamics; Health care; Risk analysis (engineering); Engineering; Engineering management; Business","score_opus":0.11024610553657346,"score_gpt":0.31951765657958614,"score_spread":0.20927155104301268,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3021975659","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8862635,0.00030069624,0.09370292,0.0005733781,0.000084377076,0.00025102327,0.0008569123,0.00025890273,0.017708207],"genre_scores_gemma":[0.99178654,0.00012834168,0.006133508,0.00002561859,0.0000051567927,0.0001531555,0.0002032616,0.000012734102,0.0015516863],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995728,0.00017602103,0.000024981811,0.000052240342,0.00007486231,0.00009906406],"domain_scores_gemma":[0.9982515,0.0012319108,0.0001631528,0.000053890046,0.00019724232,0.00010233538],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00087161985,0.00077633327,0.000576077,0.00073416485,0.00064380805,0.0010771777,0.0007916839,0.0016161043,0.0029843368],"category_scores_gemma":[0.002392318,0.00039749948,0.000855654,0.00060807535,0.00064402836,0.0006096425,0.0010450464,0.0010818539,0.00015468562],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018223294,0.000020362559,0.0010623651,0.000014202485,0.00000676728,0.000030171906,0.000023429007,0.9973272,0.00018519991,0.0005471769,0.00006072497,0.0007042285],"study_design_scores_gemma":[0.000007418791,0.000023038203,0.00032505824,0.0000034746013,0.0000039456854,0.00000342778,0.00002958875,0.9991473,0.00011473788,0.00019068593,0.00014775396,0.0000035991272],"about_ca_topic_score_codex":0.038150635,"about_ca_topic_score_gemma":0.015453546,"teacher_disagreement_score":0.038150635,"about_ca_system_score_codex":0.001229366,"about_ca_system_score_gemma":0.0016284828,"threshold_uncertainty_score":0.07585716},"labels":[],"label_agreement":null},{"id":"W3023700313","doi":"10.1108/tlo-12-2019-0182","title":"Organizational forgetting Part I: a review of the literature and future research directions","year":2020,"lang":"en","type":"review","venue":"The Learning Organization","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Forgetting; Knowledge management; Systematic review; Organizational learning; Context (archaeology); Organizational effectiveness; Organizational studies; Organizational theory; Psychology; Computer science; Management science; Management; Cognitive psychology; Political science; Engineering","score_opus":0.1215848203360507,"score_gpt":0.4227839947588199,"score_spread":0.3011991744227692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3023700313","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0004124442,0.997471,0.00024413703,0.0011498553,0.00024121869,0.000023461542,0.000019161029,0.000004793017,0.00043411535],"genre_scores_gemma":[0.004325089,0.9939224,0.0006048893,0.0006945734,0.00023075184,0.000056429915,0.00003053476,0.0000031780553,0.00013216003],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9935336,0.00231369,0.0016394233,0.00063394563,0.0015253484,0.0003539883],"domain_scores_gemma":[0.955365,0.031758215,0.005464602,0.00084142573,0.0058783265,0.00069240463],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010515413,0.00093101576,0.0024215851,0.012227998,0.0011191933,0.0046540406,0.001504783,0.0023917675,0.0033342787],"category_scores_gemma":[0.032782406,0.0006629574,0.002236865,0.010132592,0.0019046204,0.0062839705,0.0018280414,0.002448755,0.00064542744],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000092966664,0.000112063724,0.0022299835,0.17038211,0.0005685223,0.0003752922,0.0016649785,0.0003207165,0.00040217963,0.0069690505,0.01531093,0.80157125],"study_design_scores_gemma":[0.000039163344,0.00036854026,0.012716987,0.56514424,0.002408796,0.0029271587,0.006635674,0.00034602932,0.00065365864,0.012357761,0.39628726,0.000114830946],"about_ca_topic_score_codex":0.0047452315,"about_ca_topic_score_gemma":0.008409804,"teacher_disagreement_score":0.012227998,"about_ca_system_score_codex":0.0042322706,"about_ca_system_score_gemma":0.013343724,"threshold_uncertainty_score":0.05561143},"labels":[],"label_agreement":null},{"id":"W3023795961","doi":"","title":"The Economic Value regarding the Protection Activities of Critical Infrastructures","year":2011,"lang":"en","type":"article","venue":"DOAJ (DOAJ: Directory of Open Access Journals)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Value (mathematics); Business; Risk analysis (engineering); Computer science","score_opus":0.45809580602655864,"score_gpt":0.5812856811600998,"score_spread":0.12318987513354118,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3023795961","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17308474,0.009250616,0.010551537,0.021388305,0.00064116204,0.00010636833,0.00040378008,0.000017068069,0.78455645],"genre_scores_gemma":[0.9796524,0.003658456,0.0011797145,0.00037640677,0.00036548483,0.00003459745,0.000101283586,0.0000099308245,0.014621701],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9969903,0.00087202474,0.00008531662,0.00013216188,0.0015804986,0.0003396398],"domain_scores_gemma":[0.99382716,0.0030061349,0.00083130173,0.00035089196,0.0015156169,0.00046880616],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025119449,0.0003294808,0.00018070768,0.0022128273,0.0010872341,0.00584662,0.0004578662,0.0010038897,0.005857747],"category_scores_gemma":[0.011000174,0.00012768002,0.00019349784,0.0025794425,0.0047283466,0.0025653765,0.0020499425,0.0010471392,0.00062895],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025417394,0.000067988345,0.018423367,0.00029853111,0.000042102303,0.00060133776,0.0012516108,0.0036959755,0.001439931,0.84044933,0.0069478853,0.1265277],"study_design_scores_gemma":[0.000024822797,0.00022950015,0.07266464,0.001301064,0.0001003049,0.0012844341,0.008710009,0.003354082,0.0026960163,0.4835935,0.4259636,0.00007801627],"about_ca_topic_score_codex":0.0018341576,"about_ca_topic_score_gemma":0.0022017006,"teacher_disagreement_score":0.005857747,"about_ca_system_score_codex":0.0037082324,"about_ca_system_score_gemma":0.00242612,"threshold_uncertainty_score":0.026905179},"labels":[],"label_agreement":null},{"id":"W3025446686","doi":"10.14288/1.0390346","title":"Value creation from internalizing non-technical risks in projects : mining sector case","year":2020,"lang":"en","type":"article","venue":"Open Collections","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Value creation; Value (mathematics); Business; Risk analysis (engineering); Industrial organization; Computer science","score_opus":0.2652048070328069,"score_gpt":0.42611936266828526,"score_spread":0.16091455563547835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3025446686","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9338059,0.0002805089,0.009489517,0.0019794293,0.000022519831,0.00025556976,0.000039721086,0.000022785287,0.054104198],"genre_scores_gemma":[0.99354494,0.00024290886,0.0030044746,0.000064757696,0.00000758707,0.00006003152,0.000014537912,0.000005311531,0.0030554617],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"case_report","domain_scores_codex":[0.9937703,0.00385466,0.00019460228,0.00026029168,0.0010105033,0.00090961857],"domain_scores_gemma":[0.98960716,0.0064846436,0.0011644395,0.00072124397,0.00079451164,0.0012279167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006801264,0.00042728754,0.00027121307,0.0015508336,0.004587954,0.006497051,0.0010775662,0.0031486975,0.0036593126],"category_scores_gemma":[0.009616121,0.00037760354,0.00059357035,0.0016441357,0.0047135213,0.0034164852,0.006109425,0.0020142233,0.0004582515],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00067967025,0.0035044516,0.19044404,0.00083323393,0.000121825855,0.09119543,0.26216006,0.013399648,0.009579517,0.26754832,0.006245759,0.15428801],"study_design_scores_gemma":[0.00017361401,0.0018634629,0.09870703,0.0015456392,0.00018213809,0.031137161,0.60476565,0.04636722,0.008524768,0.09989849,0.10659345,0.00024140507],"about_ca_topic_score_codex":0.0033138287,"about_ca_topic_score_gemma":0.0046522804,"teacher_disagreement_score":0.006801264,"about_ca_system_score_codex":0.0037808334,"about_ca_system_score_gemma":0.0031691454,"threshold_uncertainty_score":0.03596896},"labels":[],"label_agreement":null},{"id":"W3026991497","doi":"10.1139/cjce-2019-0508","title":"A comparison of project delivery method performance for water infrastructure capital projects","year":2020,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Integrated project delivery; Wastewater; Project management; Engineering; Operations management; Civil engineering; Environmental resource management; Business; Environmental science; Environmental engineering; Systems engineering","score_opus":0.06834015016074439,"score_gpt":0.3231448302728774,"score_spread":0.254804680112133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3026991497","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99172735,0.00033277436,0.002591206,0.00008178976,0.000010025903,0.00015086195,0.00037970368,0.00007026003,0.0046559554],"genre_scores_gemma":[0.9934574,0.00027314274,0.004586505,0.000011676056,0.000006035016,0.0000942286,0.00046652873,0.00002140387,0.0010831582],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9899323,0.0038277917,0.0010049418,0.0006782034,0.0038321018,0.0007245925],"domain_scores_gemma":[0.9577648,0.024388667,0.0050735446,0.0015096224,0.0095158545,0.0017474558],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012500655,0.00046468363,0.0004819526,0.0039338395,0.00039227467,0.0017603575,0.0006073291,0.00050842296,0.0019760937],"category_scores_gemma":[0.034896284,0.0002422116,0.00041675303,0.00309371,0.00030802487,0.0015104868,0.0009885042,0.0004160679,0.000574896],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.006661096,0.002320523,0.32719627,0.0014869088,0.00034276317,0.00028327803,0.002499771,0.041747577,0.016251579,0.002386561,0.0027096719,0.596114],"study_design_scores_gemma":[0.00021009245,0.016258843,0.9061872,0.0002528781,0.00020776404,0.00029122556,0.004666139,0.054068487,0.010857229,0.0007896155,0.0060780933,0.0001323988],"about_ca_topic_score_codex":0.006722629,"about_ca_topic_score_gemma":0.00756686,"teacher_disagreement_score":0.012500655,"about_ca_system_score_codex":0.0026513543,"about_ca_system_score_gemma":0.0019655537,"threshold_uncertainty_score":0.06611061},"labels":[],"label_agreement":null},{"id":"W3031115009","doi":"10.1139/cjce-2019-0769","title":"Competency and performance measures for organizations in the construction industry","year":2020,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Organizational performance; Knowledge management; Construction industry; Categorization; Competence (human resources); Process management; Computer science; Business; Engineering; Management","score_opus":0.042386141838388895,"score_gpt":0.2529034969664154,"score_spread":0.2105173551280265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3031115009","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8173449,0.015878487,0.04719747,0.002697822,0.00023513513,0.0012168492,0.002674958,0.00023920268,0.112515114],"genre_scores_gemma":[0.9652235,0.0017205366,0.029204262,0.000154742,0.00004439326,0.00067185523,0.0011512096,0.000016331134,0.0018130934],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9903618,0.0034277968,0.0012822307,0.00034569492,0.004123895,0.0004586221],"domain_scores_gemma":[0.96603674,0.014605279,0.008269516,0.00096712564,0.009035773,0.0010855388],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010015414,0.00041672823,0.0003633903,0.011081009,0.0012324301,0.0018332772,0.0006113677,0.00074860523,0.0016771179],"category_scores_gemma":[0.03574502,0.00010956687,0.0005915051,0.006629801,0.0010665358,0.0020641456,0.0014594455,0.0008480586,0.0003540355],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023283156,0.0010372796,0.47047436,0.002482508,0.00025789786,0.00018299524,0.007252714,0.006302045,0.0028959054,0.033920452,0.0076642726,0.4672967],"study_design_scores_gemma":[0.000022810495,0.001218558,0.9346072,0.0018056337,0.00009907577,0.00041682992,0.010804453,0.0062995856,0.003329623,0.008645717,0.032628722,0.0001218051],"about_ca_topic_score_codex":0.0072151967,"about_ca_topic_score_gemma":0.012082853,"teacher_disagreement_score":0.011081009,"about_ca_system_score_codex":0.0036748757,"about_ca_system_score_gemma":0.0036857408,"threshold_uncertainty_score":0.05296719},"labels":[],"label_agreement":null},{"id":"W3034346944","doi":"10.5267/j.jpm.2020.5.001","title":"Risk management and risk management performance measurement in the construction projects of Finland","year":2020,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Risk management; Business; Risk analysis (engineering); Environmental resource management; Environmental planning; Geography; Environmental science; Finance","score_opus":0.09368439526529154,"score_gpt":0.31116984319749985,"score_spread":0.2174854479322083,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3034346944","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9925122,0.00032877657,0.003011497,0.00019663267,0.0000047548706,0.000100689365,0.000045590696,0.0000069639905,0.0037929188],"genre_scores_gemma":[0.99748564,0.00017913604,0.0018390324,0.000007500314,0.0000024291646,0.000056617962,0.000023900458,0.0000025762545,0.0004032645],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9886825,0.005795238,0.0009312801,0.00066069205,0.0031007314,0.0008294842],"domain_scores_gemma":[0.98132974,0.011144138,0.004451711,0.00071110943,0.0017195692,0.0006437493],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011132192,0.00055853213,0.00040960708,0.0024610257,0.0023639796,0.0041397926,0.000735351,0.0009855058,0.0012024106],"category_scores_gemma":[0.02228949,0.00041628056,0.0004448408,0.0029613783,0.002496361,0.002176286,0.0040505505,0.0007543191,0.00016080245],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005713963,0.0007198179,0.57893056,0.0012144106,0.00020015861,0.0043925173,0.17703158,0.029902993,0.006749886,0.018155094,0.0010784034,0.18105328],"study_design_scores_gemma":[0.000034242395,0.0010803303,0.76703334,0.00084490376,0.00012238385,0.0015725798,0.18294063,0.019262008,0.0041934624,0.009445522,0.0132557815,0.00021480203],"about_ca_topic_score_codex":0.004744718,"about_ca_topic_score_gemma":0.0052701733,"teacher_disagreement_score":0.011132192,"about_ca_system_score_codex":0.00454816,"about_ca_system_score_gemma":0.0062812734,"threshold_uncertainty_score":0.058873355},"labels":[],"label_agreement":null},{"id":"W3036245496","doi":"10.5430/rwe.v11n3p59","title":"Identification Factors Affecting Variation and Change Order of Design-Build Projects","year":2020,"lang":"en","type":"article","venue":"Research in World Economy","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Viet Nam National University Ho Chi Minh City; Ho Chi Minh City University of Technology and Education","keywords":"Change order; Variation (astronomy); Scope (computer science); Schedule; Order (exchange); Identification (biology); Project management; Process (computing); Process management; Investment (military); Quality (philosophy); Computer science; Risk analysis (engineering); Business; Operations management; Project planning; Systems engineering; Engineering; Project charter; Political science","score_opus":0.4812570873769246,"score_gpt":0.4548846131230429,"score_spread":0.026372474253881673,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3036245496","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9943773,0.00009131682,0.00202604,0.00010846942,0.000005630935,0.00010034059,0.000054276134,0.000011119616,0.0032253081],"genre_scores_gemma":[0.9986155,0.00003823674,0.0008627678,0.0000051351462,0.0000015673116,0.000014545149,0.000039929088,0.0000030833937,0.0004192388],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99316365,0.0024105555,0.00071135914,0.00050853967,0.0024122403,0.0007935914],"domain_scores_gemma":[0.96919954,0.016566481,0.007242635,0.00065598823,0.0049448116,0.0013906369],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036848495,0.00024745148,0.00019347458,0.0014787399,0.0007485571,0.0018642375,0.0003505313,0.0003035317,0.0015818095],"category_scores_gemma":[0.027003938,0.00020880882,0.00022638042,0.0011354727,0.0005771385,0.0009206632,0.00066609296,0.000565852,0.000157148],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016143896,0.0002208668,0.9281029,0.00015602945,0.000037794536,0.00062039815,0.009727899,0.0038290943,0.0027314576,0.001408772,0.0004537601,0.05254966],"study_design_scores_gemma":[0.0000052986356,0.00019156761,0.9710343,0.000056775225,0.00002589571,0.00015817137,0.017585898,0.0058567915,0.001940664,0.0005334498,0.002574111,0.000037040303],"about_ca_topic_score_codex":0.01188025,"about_ca_topic_score_gemma":0.018670598,"teacher_disagreement_score":0.01188025,"about_ca_system_score_codex":0.0025236728,"about_ca_system_score_gemma":0.003492263,"threshold_uncertainty_score":0.023622215},"labels":[],"label_agreement":null},{"id":"W3037370508","doi":"10.3390/su12135231","title":"Framework for Risk Identification of Renewable Energy Projects Using Fuzzy Case-Based Reasoning","year":2020,"lang":"en","type":"article","venue":"Sustainability","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund","keywords":"Identification (biology); Risk analysis (engineering); Renewable energy; Case-based reasoning; Fuzzy logic; Computer science; Engineering; Management science; Artificial intelligence; Business","score_opus":0.0939513635622976,"score_gpt":0.3831462581318312,"score_spread":0.28919489456953357,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3037370508","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0026601516,0.0005286434,0.9899638,0.00045061472,0.000039191083,0.00035492217,0.00013083307,0.00020154314,0.005670307],"genre_scores_gemma":[0.11261411,0.0010873778,0.8828273,0.00009907838,0.00006920916,0.00076749973,0.00041331092,0.000027232969,0.0020949272],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9953467,0.0016765747,0.0006068414,0.0006660131,0.001415454,0.0002884633],"domain_scores_gemma":[0.9971244,0.0017257078,0.0003619014,0.00014029717,0.0005289238,0.00011868117],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005691601,0.0019929297,0.0013990552,0.007743807,0.0012894553,0.004944381,0.004604945,0.002876125,0.0044283],"category_scores_gemma":[0.006533147,0.00082321547,0.003962765,0.0034420895,0.0018753553,0.0035518846,0.0027745862,0.0017664144,0.00057248573],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004809824,0.00021929985,0.0014675419,0.0005373123,0.00022797356,0.0019160389,0.00083988335,0.50440294,0.0013241267,0.40379718,0.0029752024,0.08224444],"study_design_scores_gemma":[0.00004270045,0.000031773645,0.00026793897,0.00022687564,0.00008930919,0.0004045287,0.0002629922,0.8589889,0.0005539948,0.13012524,0.008950296,0.00005544086],"about_ca_topic_score_codex":0.01634853,"about_ca_topic_score_gemma":0.011822921,"teacher_disagreement_score":0.01634853,"about_ca_system_score_codex":0.0034574084,"about_ca_system_score_gemma":0.0038069184,"threshold_uncertainty_score":0.032506764},"labels":[],"label_agreement":null},{"id":"W3039850101","doi":"","title":"Manageability of Complex Construction Engineering Projects: Dealing with Uncertainty","year":2009,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute on Governance","funders":"","keywords":"Construction engineering; Computer science; Risk analysis (engineering); Engineering; Systems engineering; Business","score_opus":0.08776948140611116,"score_gpt":0.33233570246146343,"score_spread":0.24456622105535228,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3039850101","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39822838,0.005088911,0.5422233,0.016885595,0.00017644108,0.00039871613,0.0004695167,0.00013643206,0.03639273],"genre_scores_gemma":[0.9782332,0.0010171699,0.019190758,0.00008692224,0.00011352919,0.00014714764,0.00010102292,0.000023498736,0.0010866893],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.983896,0.009150069,0.00094825216,0.0011507977,0.003831216,0.0010235001],"domain_scores_gemma":[0.91231555,0.07028785,0.009519476,0.002618277,0.0033552814,0.001903701],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0210262,0.0008935925,0.0014421641,0.0027831248,0.0018195594,0.0075893165,0.0013826868,0.002424364,0.002689571],"category_scores_gemma":[0.08957659,0.00088073756,0.0011131936,0.0031460284,0.003482691,0.008182893,0.0048928363,0.0025051474,0.0001570108],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023900469,0.00011785698,0.017866569,0.000490403,0.00040429918,0.0012662775,0.0038051216,0.6177242,0.0007719077,0.22484432,0.0028629063,0.12960707],"study_design_scores_gemma":[0.00003410132,0.00018626727,0.007043181,0.00026732823,0.00006587202,0.00031574152,0.0022604177,0.29754767,0.00043964438,0.6872843,0.0044732587,0.00008214864],"about_ca_topic_score_codex":0.005139865,"about_ca_topic_score_gemma":0.0038184605,"teacher_disagreement_score":0.0210262,"about_ca_system_score_codex":0.0045284536,"about_ca_system_score_gemma":0.003036377,"threshold_uncertainty_score":0.111198485},"labels":[],"label_agreement":null},{"id":"W3041585845","doi":"","title":"Evaluation of construction contract documents to be applied in modular construction focusing ambiguities; A text processing approach","year":2019,"lang":"en","type":"dissertation","venue":"Spectrum Research Repository (Concordia University)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Modular design; Readability; Benchmark (surveying); Computer science; Order (exchange); Confusion; Demolition; Modular construction; Engineering; Operations research; Process management; Business; Civil engineering; Programming language","score_opus":0.09996501131915772,"score_gpt":0.3696501280651446,"score_spread":0.26968511674598683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3041585845","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75768137,0.0030898845,0.1672258,0.0015500946,0.00044468883,0.004420957,0.021547418,0.0031651643,0.040874667],"genre_scores_gemma":[0.6831369,0.0010167944,0.28746614,0.00016073286,0.0001680448,0.0015937613,0.015917141,0.0002764014,0.010264118],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99502337,0.0012481553,0.0007968115,0.0005622409,0.0021061217,0.00026320532],"domain_scores_gemma":[0.9747762,0.010826617,0.0025498855,0.00064691505,0.010774477,0.0004259673],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00545775,0.00072186196,0.0004767728,0.015400357,0.0010660803,0.0036638617,0.00066575437,0.0007256261,0.0034069244],"category_scores_gemma":[0.025329629,0.00016016798,0.0005707828,0.00939728,0.00073316117,0.0022840675,0.000937491,0.0006597677,0.0013877875],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009606401,0.00034066226,0.03769187,0.003238471,0.00011287452,0.0016355375,0.012265368,0.0050471583,0.04567523,0.008137711,0.021066438,0.86382794],"study_design_scores_gemma":[0.0002008874,0.0010758262,0.35238037,0.0019696685,0.0007054209,0.0023680732,0.068213396,0.19447647,0.120307736,0.013866196,0.24393198,0.00050400314],"about_ca_topic_score_codex":0.017299607,"about_ca_topic_score_gemma":0.01614057,"teacher_disagreement_score":0.017299607,"about_ca_system_score_codex":0.00247774,"about_ca_system_score_gemma":0.0036587145,"threshold_uncertainty_score":0.03439778},"labels":[],"label_agreement":null},{"id":"W3041880869","doi":"10.12821/ijispm070303","title":"A comparison of project control standards based on network analysis","year":2021,"lang":"en","type":"article","venue":"International journal of information systems and project management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Project management; Project management triangle; Work breakdown structure; Process management; Project planning; Control (management); Software project management; Function (biology); Best practice; Engineering management; Extreme project management; OPM3; Computer science; Engineering; Systems engineering; Software development; Software; Management","score_opus":0.04875694155674499,"score_gpt":0.4041446204716311,"score_spread":0.3553876789148861,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3041880869","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44743973,0.0028216108,0.46200824,0.0017516831,0.00016415532,0.0010015515,0.0009482482,0.0015660308,0.08229864],"genre_scores_gemma":[0.9176835,0.0008057324,0.07795839,0.00007898967,0.000021311711,0.0005328507,0.001162586,0.00017297611,0.0015837459],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.94036543,0.025998166,0.0032629767,0.0029945883,0.025876546,0.0015022473],"domain_scores_gemma":[0.8601607,0.086664885,0.009748189,0.0108037805,0.031062024,0.0015604667],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.04752492,0.00082371925,0.0012127339,0.011036988,0.0010219588,0.0058145076,0.0023711359,0.001567003,0.0020838154],"category_scores_gemma":[0.13532345,0.0005700722,0.0011958001,0.006336369,0.0018970491,0.007393059,0.0031510347,0.0013560518,0.00037527687],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016208517,0.00080970465,0.06660369,0.0013907752,0.00048096277,0.00016580576,0.0034440618,0.27597004,0.0033306964,0.18396015,0.0046865153,0.4575367],"study_design_scores_gemma":[0.00021363878,0.001321803,0.07499783,0.0011532418,0.0002842288,0.00022666549,0.004715327,0.7911726,0.00788802,0.098378606,0.019335886,0.00031208806],"about_ca_topic_score_codex":0.010128781,"about_ca_topic_score_gemma":0.007926347,"teacher_disagreement_score":0.04752492,"about_ca_system_score_codex":0.0087280935,"about_ca_system_score_gemma":0.0046339347,"threshold_uncertainty_score":0.25133878},"labels":[],"label_agreement":null},{"id":"W3042965572","doi":"10.1108/ecam-11-2019-0600","title":"The role of project management office in developing knowledge management infrastructure","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Upstream (networking); Business; Petroleum industry; Phase (matter); Knowledge management; Process management; Engineering management; Engineering; Computer science; Telecommunications","score_opus":0.021691872835161295,"score_gpt":0.2806626393875307,"score_spread":0.25897076655236945,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3042965572","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77142626,0.0019809161,0.05016299,0.009300425,0.00021808443,0.0011646637,0.0001908011,0.0005916504,0.16496429],"genre_scores_gemma":[0.9797595,0.00063035404,0.014358345,0.00023759805,0.00004401691,0.00015569123,0.00007997478,0.000036788308,0.004697701],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.98878235,0.005636942,0.0006981986,0.00078415696,0.0018189896,0.0022793512],"domain_scores_gemma":[0.96612483,0.011428864,0.0061014937,0.0026905874,0.005078133,0.008576018],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011080354,0.00033408488,0.00019865263,0.002497861,0.0024148687,0.006408756,0.0012769179,0.00089676166,0.005323497],"category_scores_gemma":[0.023264002,0.00032831903,0.00023252516,0.0019198788,0.0019248431,0.0045070406,0.004969868,0.00112991,0.0013451959],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002341092,0.0010698442,0.16181356,0.0008318597,0.00006590639,0.0011257246,0.0190714,0.002336737,0.003870288,0.039302707,0.012166334,0.75811154],"study_design_scores_gemma":[0.0002202873,0.0028313422,0.41057643,0.0022482702,0.00019910069,0.002937052,0.100671045,0.0149213495,0.009070133,0.04022188,0.41585073,0.00025240437],"about_ca_topic_score_codex":0.0024375569,"about_ca_topic_score_gemma":0.0022750522,"teacher_disagreement_score":0.011080354,"about_ca_system_score_codex":0.0021250157,"about_ca_system_score_gemma":0.015721135,"threshold_uncertainty_score":0.058599234},"labels":[],"label_agreement":null},{"id":"W3044999828","doi":"10.1139/cjce-2020-0032","title":"Hybrid fuzzy system dynamics model for analyzing the impacts of interrelated risk and opportunity events on project contingency","year":2020,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Fuzzy logic; Risk analysis (engineering); Computer science; Risk assessment; Contingency; Judgement; Work (physics); Operations research; Management science; Engineering; Artificial intelligence","score_opus":0.05449068122408518,"score_gpt":0.28018928483442757,"score_spread":0.22569860361034239,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3044999828","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025708538,0.00009378198,0.9675628,0.0001397266,0.000026325555,0.00005831163,0.00016590128,0.00017693883,0.006067682],"genre_scores_gemma":[0.8782103,0.00026558322,0.11295851,0.00007367078,0.000027957236,0.00043556368,0.00024890702,0.000034195105,0.0077452157],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968135,0.000102152066,0.000015269992,0.000072187635,0.00009959699,0.000029479303],"domain_scores_gemma":[0.9996123,0.00024231168,0.000042155032,0.000015538437,0.00007155448,0.000016217129],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000723071,0.0006764792,0.00049500744,0.00086937816,0.00050511607,0.0011287852,0.0008143228,0.00086767384,0.003210126],"category_scores_gemma":[0.0013034994,0.00031922336,0.0007963997,0.00050381175,0.00040517593,0.0010146816,0.00056799984,0.0008227211,0.0003297702],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025545603,0.000020968739,0.00052033295,0.000023391538,0.000029860481,0.000043338034,0.000057863315,0.9790765,0.0011884551,0.011280153,0.00024598674,0.007487577],"study_design_scores_gemma":[0.0000028214863,0.000007941207,0.00007881825,0.0000019675651,0.000003809793,0.0000041300955,0.000005758028,0.9981318,0.00007513384,0.0014826369,0.00020246439,0.000002714339],"about_ca_topic_score_codex":0.015162538,"about_ca_topic_score_gemma":0.010877498,"teacher_disagreement_score":0.015162538,"about_ca_system_score_codex":0.0012351478,"about_ca_system_score_gemma":0.0014517849,"threshold_uncertainty_score":0.030148566},"labels":[],"label_agreement":null},{"id":"W3045318604","doi":"10.1177/0361198120934477","title":"Large Program Cost Estimating: Nuanced Implementation Assumptions Make Non-Nuanced Impacts","year":2020,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Arup Group (Canada)","funders":"","keywords":"Megaproject; Premise; Transport engineering; Schedule; Operations research; Cost–benefit analysis; Integrated project delivery; Computer science; Risk analysis (engineering); Engineering; Project management; Business; Systems engineering","score_opus":0.2831951473995964,"score_gpt":0.5295371193735436,"score_spread":0.24634197197394725,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3045318604","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11085373,0.0017092014,0.7749581,0.012386445,0.00023313936,0.0010680859,0.0016333376,0.00041140572,0.09674659],"genre_scores_gemma":[0.80097115,0.0014178439,0.19066261,0.0010655447,0.00015396583,0.00085126667,0.0004962254,0.00018453517,0.00419685],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.98244065,0.011416389,0.00065382605,0.0013789495,0.00335296,0.00075720117],"domain_scores_gemma":[0.7963309,0.17716947,0.008623801,0.01051289,0.0067308866,0.00063199573],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.027281849,0.0015426097,0.0011343538,0.0023905868,0.0010548518,0.0058376137,0.003599758,0.002145989,0.007124626],"category_scores_gemma":[0.13610977,0.00143612,0.0015843863,0.0030822705,0.0026969176,0.012429561,0.0034484202,0.0058435663,0.00073239027],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021736119,0.00032093067,0.024007972,0.0009898483,0.00042011295,0.00048551065,0.0011794681,0.45367363,0.0006050059,0.3945039,0.007059024,0.11653726],"study_design_scores_gemma":[0.00006174335,0.0003256401,0.014883473,0.0009975844,0.0003976593,0.0002676889,0.0022177172,0.4458937,0.0013969503,0.51207113,0.021340879,0.00014579605],"about_ca_topic_score_codex":0.014416923,"about_ca_topic_score_gemma":0.016193548,"teacher_disagreement_score":0.027281849,"about_ca_system_score_codex":0.0066204714,"about_ca_system_score_gemma":0.004218868,"threshold_uncertainty_score":0.14428192},"labels":[],"label_agreement":null},{"id":"W3045621045","doi":"10.1108/ecam-05-2020-0299","title":"Identifying enablers for coordination across construction supply chain processes: a systematic literature review","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":102,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Supply chain; Interdependence; Knowledge management; Process management; Computer science; Process (computing); Systematic review; Enabling; Stakeholder; Business","score_opus":0.039085118006271395,"score_gpt":0.3152694259803482,"score_spread":0.2761843079740768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3045621045","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028337731,0.9904627,0.0019303499,0.001081454,0.00018993925,0.0014682898,0.0006026771,0.000025442712,0.0014053113],"genre_scores_gemma":[0.032174405,0.95741576,0.006018579,0.00082262215,0.0001134507,0.0025962696,0.000613197,0.000015757958,0.00022987298],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9729273,0.01034059,0.009294707,0.0017557387,0.00499776,0.0006839573],"domain_scores_gemma":[0.8688307,0.097084776,0.015566745,0.00257508,0.014891955,0.0010507016],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.028628133,0.0019635332,0.0051788134,0.034775376,0.0018101974,0.0054816445,0.0022997798,0.0026643733,0.004028548],"category_scores_gemma":[0.10486319,0.0015632891,0.0063335146,0.023187935,0.0023246848,0.0065551884,0.0036744184,0.0021089572,0.0005090175],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007899741,0.000055535253,0.0016295384,0.8419608,0.0022075637,0.00033708147,0.0021001794,0.00034930295,0.00022869429,0.0028273934,0.0026186595,0.14560618],"study_design_scores_gemma":[0.000048473932,0.00010787909,0.0023919248,0.9497917,0.009203246,0.00043683304,0.0021626847,0.00015158257,0.00023222728,0.0012299254,0.034188353,0.000055106502],"about_ca_topic_score_codex":0.010136486,"about_ca_topic_score_gemma":0.025524292,"teacher_disagreement_score":0.034775376,"about_ca_system_score_codex":0.0070541,"about_ca_system_score_gemma":0.050099052,"threshold_uncertainty_score":0.15140182},"labels":[],"label_agreement":null},{"id":"W3045708691","doi":"10.5465/ambpp.2020.18077abstract","title":"Innovation Potentiality: Measuring Organisational Innovation Potential in the Canadian Public Sector","year":2020,"lang":"en","type":"article","venue":"Academy of Management Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Commit; Status quo; Business; Public sector; Politics; Public relations; Knowledge management; Marketing; Political science; Computer science","score_opus":0.2269703979351967,"score_gpt":0.33293363526804093,"score_spread":0.10596323733284424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3045708691","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9479361,0.0003973329,0.0012389122,0.00057379017,0.00002412084,0.0005019631,0.001227303,0.000044548673,0.048055965],"genre_scores_gemma":[0.9942028,0.00022779129,0.0021311447,0.000033720844,0.0000038450944,0.00014119044,0.0005434043,0.0000045545244,0.0027116],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9930341,0.0007093125,0.00040313374,0.0002469973,0.0045845946,0.0010218937],"domain_scores_gemma":[0.98452306,0.0022735817,0.0019587034,0.0004377051,0.008454046,0.0023529236],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005145737,0.00037957556,0.00030054586,0.008076632,0.0048927874,0.0030517885,0.0014083694,0.0006421348,0.0024353329],"category_scores_gemma":[0.017907513,0.00019413927,0.0007476556,0.008551588,0.0025807973,0.0012941412,0.0026530179,0.00070664694,0.00036842082],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014656823,0.00028368455,0.8828797,0.00040979453,0.00009530903,0.00014500137,0.010475874,0.0024219004,0.001264526,0.0058081886,0.0037252894,0.09234411],"study_design_scores_gemma":[0.000012206574,0.00012405217,0.9799645,0.0000817162,0.000028214197,0.000037293245,0.011005785,0.0016911672,0.00049023033,0.00055712956,0.005965221,0.000042483414],"about_ca_topic_score_codex":0.96069765,"about_ca_topic_score_gemma":0.97746825,"teacher_disagreement_score":0.9466115,"about_ca_system_score_codex":0.053388484,"about_ca_system_score_gemma":0.071848184,"threshold_uncertainty_score":0.38736236},"labels":[],"label_agreement":null},{"id":"W3045968789","doi":"10.12821/ijispm020402","title":"Governance challenges in temporary organizations: a case of evolution and representations","year":2022,"lang":"en","type":"article","venue":"International journal of information systems and project management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Operationalization; Corporate governance; Project governance; Business; Diversity (politics); Public relations; Multi-level governance; Process management; Political science; Public administration; Law; Finance","score_opus":0.056537438891047134,"score_gpt":0.34439204487368846,"score_spread":0.28785460598264134,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3045968789","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9394206,0.00031569216,0.012434378,0.008070593,0.00009305243,0.00008869621,0.000054713088,0.00007305755,0.039449275],"genre_scores_gemma":[0.99641573,0.00006222275,0.001124944,0.0001525706,0.000016169879,0.00003681148,0.00002567259,0.000017176148,0.0021486727],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.98355085,0.010323042,0.0005244515,0.0011064629,0.0023478232,0.0021474313],"domain_scores_gemma":[0.9777359,0.010346051,0.004144659,0.003325611,0.0013758756,0.0030719321],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009043787,0.00028045286,0.00033931877,0.001997146,0.010392796,0.011513928,0.0019413817,0.0033444373,0.003550592],"category_scores_gemma":[0.02909209,0.0003287447,0.0005497283,0.002720319,0.014733528,0.0068996195,0.011227444,0.0031483339,0.00036791665],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000120372075,0.00016279944,0.042495694,0.000114815055,0.000028180679,0.0096749,0.69146895,0.0013937124,0.0014240404,0.2060033,0.00431505,0.042798206],"study_design_scores_gemma":[0.00002648011,0.00013402998,0.023628432,0.00024880184,0.000024686364,0.0034368576,0.8147959,0.005221331,0.000677292,0.051906936,0.09982202,0.00007721515],"about_ca_topic_score_codex":0.007608642,"about_ca_topic_score_gemma":0.0070718806,"teacher_disagreement_score":0.011513928,"about_ca_system_score_codex":0.0061732763,"about_ca_system_score_gemma":0.0038604066,"threshold_uncertainty_score":0.047828674},"labels":[],"label_agreement":null},{"id":"W3048392534","doi":"10.3311/ccc2020-031","title":"Improving But-For Delay Analysis and Concurrency Assessment","year":2020,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Viewpoints; Concurrency; Computer science; Static timing analysis; Static analysis; Critical path method; Risk analysis (engineering); Operations research; Software engineering; Distributed computing; Programming language; Systems engineering; Engineering; Embedded system","score_opus":0.11448941738608696,"score_gpt":0.40344146832798516,"score_spread":0.2889520509418982,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3048392534","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014889103,0.00029458024,0.9793144,0.00018772362,0.00008585005,0.00017860226,0.00023833117,0.0026668545,0.0021446238],"genre_scores_gemma":[0.36474413,0.0003623132,0.62970996,0.00012461777,0.00007513689,0.00033074833,0.00076508365,0.0007045152,0.0031834359],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9946128,0.0010568796,0.00045009362,0.0007611101,0.0024371522,0.00068201014],"domain_scores_gemma":[0.98627895,0.006031054,0.0015594931,0.0014069659,0.0044585923,0.00026492006],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00506796,0.0020952427,0.0012467566,0.004371909,0.00085815537,0.0030510908,0.0018836556,0.00077352824,0.00592646],"category_scores_gemma":[0.02398061,0.0005668849,0.0016982026,0.0019323004,0.00072746334,0.004976075,0.0017367987,0.0016709913,0.00082876714],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008149414,0.00028877996,0.01808219,0.0012021007,0.00029602597,0.000596574,0.0011057005,0.23080668,0.0377017,0.084581174,0.0076691564,0.616855],"study_design_scores_gemma":[0.00007373113,0.00024659332,0.003575707,0.00022185434,0.00018532752,0.00039180068,0.00045525088,0.87751085,0.037520908,0.059377212,0.020278798,0.00016192772],"about_ca_topic_score_codex":0.007982521,"about_ca_topic_score_gemma":0.0056173536,"teacher_disagreement_score":0.007982521,"about_ca_system_score_codex":0.0016535383,"about_ca_system_score_gemma":0.0047507947,"threshold_uncertainty_score":0.026802242},"labels":[],"label_agreement":null},{"id":"W3081369718","doi":"10.47893/imr.2009.1029","title":"The Interplay of Risk Management and Uncertainty: A Project Management Practice Perspective.","year":2009,"lang":"en","type":"article","venue":"Interscience Management Review","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; Université du Québec; Université du Québec à Montréal","funders":"","keywords":"Risk management; Project risk management; Risk analysis (engineering); Perspective (graphical); Set (abstract data type); Project management; Computer science; Risk management plan; Risk management information systems; Knowledge management; Management science; IT risk management; Project management triangle; Business; Engineering; Information system; Systems engineering; Management information systems","score_opus":0.03889144301973547,"score_gpt":0.41471182959160274,"score_spread":0.3758203865718673,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3081369718","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47302493,0.08719949,0.19281939,0.08741268,0.0004352677,0.00050541613,0.000107276384,0.000088567656,0.15840702],"genre_scores_gemma":[0.9762867,0.010986697,0.010687144,0.0006531437,0.00009822888,0.00013974552,0.000014843715,0.000006032336,0.0011275618],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.95382583,0.034374077,0.0014055478,0.0010901673,0.008297653,0.0010067818],"domain_scores_gemma":[0.9126914,0.069043964,0.009476497,0.0012696176,0.0059368717,0.0015816302],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.025293794,0.0004782264,0.000623865,0.0038970285,0.0016167714,0.0055901185,0.0010997017,0.0019037775,0.001348596],"category_scores_gemma":[0.05882542,0.00036296376,0.0003000906,0.003980054,0.0060730623,0.006724811,0.004091387,0.001621702,0.00023037138],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017712105,0.00031631722,0.050899174,0.0039004164,0.0003211842,0.0015260819,0.08634665,0.012012967,0.0014849028,0.33781776,0.008354005,0.49684337],"study_design_scores_gemma":[0.000085819425,0.0016540518,0.07670558,0.006400627,0.00029707106,0.0040355353,0.2517041,0.018852575,0.002598376,0.46294308,0.17447102,0.00025206275],"about_ca_topic_score_codex":0.0017502327,"about_ca_topic_score_gemma":0.0024888348,"teacher_disagreement_score":0.025293794,"about_ca_system_score_codex":0.004162681,"about_ca_system_score_gemma":0.007315621,"threshold_uncertainty_score":0.13376796},"labels":[],"label_agreement":null},{"id":"W3082813023","doi":"10.5539/ibr.v13n9p166","title":"Management and Cost Control of Construction Projects in Jordan","year":2020,"lang":"en","type":"article","venue":"International Business Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Dimension (graph theory); Control (management); Business; Project manager; Project planning; Sample (material); Operations management; Data collection; Relevance (law); Quality (philosophy); Project management; Workforce; Cost contingency; Cost accounting; Cost engineering; Accounting; Economics; Management","score_opus":0.18185134318109408,"score_gpt":0.43405575197924967,"score_spread":0.2522044087981556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3082813023","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9900864,0.0008678555,0.0008080104,0.0005514671,0.000007182249,0.000053030883,0.000051737254,0.000007722201,0.007566622],"genre_scores_gemma":[0.99614066,0.00055772386,0.000821805,0.000027520784,0.0000074588584,0.000027638247,0.00005078839,0.0000036302758,0.0023627377],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9967253,0.0012145956,0.00023400503,0.00017489801,0.0012233609,0.00042780093],"domain_scores_gemma":[0.9962,0.00057241984,0.0016103477,0.000100381396,0.0009991908,0.0005176037],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019118995,0.00023590538,0.00015438015,0.0013692838,0.0010693463,0.0023842382,0.00052804686,0.00036209697,0.0019434709],"category_scores_gemma":[0.0045479117,0.00017620198,0.00013578414,0.001683244,0.0006184351,0.00076037674,0.0011219939,0.00030716124,0.00019461356],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032177384,0.0008646854,0.57024854,0.0005941796,0.00007940208,0.0015853941,0.014642677,0.019373212,0.003951887,0.012269246,0.0064742034,0.36959487],"study_design_scores_gemma":[0.00003119241,0.00064781355,0.89601636,0.00023850462,0.000025223646,0.0009773207,0.04277862,0.012486212,0.0020138987,0.0043319673,0.040368374,0.00008453542],"about_ca_topic_score_codex":0.0074453345,"about_ca_topic_score_gemma":0.01069673,"teacher_disagreement_score":0.0074453345,"about_ca_system_score_codex":0.0036018246,"about_ca_system_score_gemma":0.0039028374,"threshold_uncertainty_score":0.02613318},"labels":[],"label_agreement":null},{"id":"W3086177894","doi":"10.12821/ijispm070104","title":"Project resilience: a conceptual framework","year":2022,"lang":"en","type":"article","venue":"International journal of information systems and project management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Resilience (materials science); Conceptual framework; Process management; Computer science; Knowledge management; Business; Systems engineering; Sociology; Engineering; Social science; Materials science","score_opus":0.05096804360488408,"score_gpt":0.36507560315003684,"score_spread":0.3141075595451528,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3086177894","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0655721,0.01951519,0.5686881,0.097016394,0.0010961868,0.0016882666,0.00091677485,0.0003967215,0.24511027],"genre_scores_gemma":[0.8338351,0.012643716,0.14023441,0.0018218408,0.00033844876,0.0026098455,0.0004623305,0.000081436156,0.007972923],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9896908,0.0069947722,0.0005363806,0.0007985629,0.0012090781,0.0007705366],"domain_scores_gemma":[0.9920919,0.0036862066,0.0011839346,0.0005002776,0.0011411781,0.0013965733],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0128266765,0.0015224795,0.0006636733,0.009125948,0.0045040976,0.009702701,0.0041472283,0.003392096,0.004040955],"category_scores_gemma":[0.011005685,0.000550178,0.0010131892,0.007041706,0.025442803,0.016860358,0.010754854,0.0040002647,0.0006577098],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000059789963,0.00002230106,0.00070460653,0.00014185606,0.000007895189,0.00012063935,0.00843462,0.00175364,0.00005705571,0.9776292,0.0017338104,0.009388515],"study_design_scores_gemma":[0.000011361505,0.000054084358,0.0012572084,0.0011875264,0.00001710144,0.00033939947,0.026757289,0.0053685023,0.000084405176,0.88247424,0.08240129,0.000047620888],"about_ca_topic_score_codex":0.0048317527,"about_ca_topic_score_gemma":0.0025956985,"teacher_disagreement_score":0.0128266765,"about_ca_system_score_codex":0.0078221625,"about_ca_system_score_gemma":0.010831004,"threshold_uncertainty_score":0.067834795},"labels":[],"label_agreement":null},{"id":"W3088080784","doi":"10.24928/2020/0044","title":"Measuring Project Value: A Review of Current Practices and Relation to Project Success","year":2020,"lang":"en","type":"review","venue":"Annual Conference of the International Group for Lean Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Value (mathematics); Project management; Measure (data warehouse); Project stakeholder; Knowledge management; Variety (cybernetics); Project management triangle; Process management; Product (mathematics); Business; Project charter; Computer science; Engineering; Systems engineering","score_opus":0.3647181391781428,"score_gpt":0.46860446757514096,"score_spread":0.10388632839699818,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3088080784","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00036287232,0.99815184,0.0004015248,0.0004080311,0.0000489983,0.000013391034,0.000025530402,0.00000437155,0.00058339804],"genre_scores_gemma":[0.0029839054,0.9960549,0.0006937506,0.00010877414,0.000034696415,0.00002362613,0.00002702381,0.0000031531713,0.00007011403],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99066836,0.0027643794,0.002070921,0.0009851529,0.0033050107,0.0002060709],"domain_scores_gemma":[0.95636594,0.03345402,0.0040200255,0.0005487196,0.0052403347,0.00037095768],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012651208,0.0013548016,0.0025682834,0.01335604,0.0006804217,0.0034685126,0.0021391087,0.0017041789,0.0017130001],"category_scores_gemma":[0.023015745,0.0010068057,0.0012077298,0.017742738,0.002495353,0.0045755664,0.0015768846,0.0016008866,0.00065761665],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058080244,0.00006063299,0.0016754426,0.058442857,0.00019138964,0.00008133113,0.000603979,0.00039791776,0.00031796482,0.0037988904,0.005622176,0.9287493],"study_design_scores_gemma":[0.000033293527,0.00042590447,0.020334303,0.20004392,0.001131006,0.0021226306,0.0036860737,0.00061018235,0.0015007687,0.009795205,0.7601252,0.00019148983],"about_ca_topic_score_codex":0.0058434526,"about_ca_topic_score_gemma":0.00896006,"teacher_disagreement_score":0.01335604,"about_ca_system_score_codex":0.0038040606,"about_ca_system_score_gemma":0.007215466,"threshold_uncertainty_score":0.06690675},"labels":[],"label_agreement":null},{"id":"W3089458991","doi":"10.1002/sres.2744","title":"Creating a ‘sustainability sublime’ to enable megaprojects to meet the United Nations sustainable development goals","year":2020,"lang":"en","type":"article","venue":"Systems Research and Behavioral Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Megaproject; Sublime; Sustainability; Corporate governance; Politics; Sustainable development; Business; Economics; Political science; Management; Finance; Law","score_opus":0.33944018941313087,"score_gpt":0.5018862880544358,"score_spread":0.16244609864130494,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3089458991","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18370605,0.0030421128,0.16784775,0.12301039,0.0027657733,0.0013337124,0.0002622581,0.0015656215,0.51646626],"genre_scores_gemma":[0.8495974,0.0016141253,0.09707027,0.008356127,0.00039340317,0.0008287343,0.00024557853,0.00041889487,0.041475583],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98879725,0.007022968,0.00033633257,0.0005206476,0.0018865855,0.001436275],"domain_scores_gemma":[0.98839974,0.0019958157,0.0013788198,0.0014862582,0.0023417682,0.0043975855],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014026247,0.0006112631,0.00028559662,0.0012805595,0.0048104213,0.009724897,0.0016654213,0.0026174833,0.0129647525],"category_scores_gemma":[0.012972053,0.00051395624,0.000548588,0.0010920428,0.0061640795,0.007971186,0.016769877,0.0038302832,0.0033779044],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010136896,0.00083403836,0.026389241,0.0009648878,0.000063242325,0.0013921568,0.03664004,0.0041411775,0.0062744245,0.530463,0.14778894,0.24494766],"study_design_scores_gemma":[0.00003247227,0.00032972012,0.013735924,0.00087245496,0.00002073043,0.00061316974,0.021800578,0.0024513763,0.0023022809,0.091059014,0.86670727,0.00007512322],"about_ca_topic_score_codex":0.0019986616,"about_ca_topic_score_gemma":0.0053413454,"teacher_disagreement_score":0.014026247,"about_ca_system_score_codex":0.0034896885,"about_ca_system_score_gemma":0.0128946705,"threshold_uncertainty_score":0.074178755},"labels":[],"label_agreement":null},{"id":"W3090259606","doi":"10.1108/ijmpb-01-2020-0028","title":"Does one project success measure fit all? An empirical investigation of Brazilian projects","year":2020,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Project management; Context (archaeology); Originality; Project stakeholder; Project management triangle; OPM3; Measure (data warehouse); Process management; Scale (ratio); Knowledge management; Computer science; Project planning; Software project management; Project manager; Business; Software; Engineering; Software development; Sociology; Systems engineering; Qualitative research","score_opus":0.21045348676436398,"score_gpt":0.409726592907396,"score_spread":0.199273106143032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3090259606","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99136496,0.00063229556,0.0030182903,0.0003591977,0.000008906861,0.00014105218,0.00006864534,0.000006495161,0.004400185],"genre_scores_gemma":[0.9980323,0.00027754568,0.0014347101,0.00002358587,0.0000034028408,0.000112520385,0.000043646054,0.00000447902,0.00006786362],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9740205,0.016798086,0.0019121474,0.0013275845,0.0048583793,0.0010833682],"domain_scores_gemma":[0.84858507,0.11804461,0.013603429,0.0056762663,0.011595784,0.002494866],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03313069,0.0006731222,0.0008653125,0.0047840253,0.0014714482,0.0024951391,0.0008847235,0.0006366531,0.0012144366],"category_scores_gemma":[0.12894787,0.00041884658,0.00056170864,0.0076612444,0.0029160592,0.0031896268,0.0026227727,0.0009630012,0.00015546993],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014107235,0.0005676989,0.8123828,0.00084842474,0.00015864383,0.00041605532,0.04357234,0.0012999696,0.00050617754,0.00919817,0.00092218496,0.12998644],"study_design_scores_gemma":[0.000032949643,0.0011190989,0.87596494,0.0015532164,0.00015953301,0.0006420682,0.09510644,0.0098505085,0.00059902616,0.0056943204,0.009218959,0.000058915593],"about_ca_topic_score_codex":0.0064285747,"about_ca_topic_score_gemma":0.007642568,"teacher_disagreement_score":0.03313069,"about_ca_system_score_codex":0.0024082782,"about_ca_system_score_gemma":0.0044412776,"threshold_uncertainty_score":0.17521393},"labels":[],"label_agreement":null},{"id":"W3092056003","doi":"10.1108/ijmpb-02-2020-0071","title":"Critical variables and constructs in the context of project management: importance-performance analysis","year":2020,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; Thompson Rivers University","funders":"","keywords":"Project management; Context (archaeology); Process management; Computer science; OPM3; Project management triangle; Originality; Performance management; Performance indicator; Knowledge management; Identification (biology); Business; Engineering; Systems engineering; Psychology; Marketing","score_opus":0.07648528836485287,"score_gpt":0.36281533006138234,"score_spread":0.2863300416965295,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3092056003","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82662463,0.00068012654,0.143172,0.0010635605,0.00008875662,0.0010228821,0.0003901104,0.00015376511,0.026804136],"genre_scores_gemma":[0.9674558,0.00012588131,0.031470593,0.00004359529,0.000029946234,0.0004055141,0.00010811579,0.000023938579,0.00033661976],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9887771,0.006400938,0.0007449731,0.0006469603,0.0029238393,0.0005062144],"domain_scores_gemma":[0.9221024,0.057380155,0.007848665,0.0032223442,0.008189139,0.0012573107],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017684545,0.0007103755,0.00044009165,0.006868431,0.0015406983,0.0036040994,0.0006856769,0.00035727076,0.002484892],"category_scores_gemma":[0.055986993,0.0003234954,0.00069249584,0.006999343,0.004289933,0.003025921,0.0025913354,0.0015947341,0.00019581037],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007410498,0.00048422508,0.41979215,0.0016233862,0.0002468726,0.0005088869,0.032461323,0.011111742,0.0053202775,0.1466168,0.0026450187,0.3784483],"study_design_scores_gemma":[0.000086850814,0.0023810575,0.6600455,0.0012751636,0.00029765602,0.0009815416,0.061623063,0.060134266,0.014443458,0.16708903,0.03142039,0.00022194658],"about_ca_topic_score_codex":0.001595474,"about_ca_topic_score_gemma":0.0009664006,"teacher_disagreement_score":0.017684545,"about_ca_system_score_codex":0.002470018,"about_ca_system_score_gemma":0.0042608073,"threshold_uncertainty_score":0.093525946},"labels":[],"label_agreement":null},{"id":"W3095605306","doi":"10.5267/j.jpm.2020.10.003","title":"A hybrid mathematical programming model and statistical approach for bidding price decision in construction projects","year":2020,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bidding; Computer science; Robustness (evolution); Profit (economics); Operations research; Mathematical optimization; Key (lock); Realization (probability); Competitor analysis; Order (exchange); Economics; Engineering; Mathematics; Microeconomics; Finance","score_opus":0.1268575664002311,"score_gpt":0.37375400401749787,"score_spread":0.24689643761726676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3095605306","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0062115714,0.0002018932,0.99058974,0.00019521915,0.000018146438,0.000044057448,0.00005956165,0.000065200795,0.0026146714],"genre_scores_gemma":[0.7413673,0.001605216,0.24838789,0.00021828782,0.00012900715,0.0010457869,0.0003594461,0.000095642135,0.006791525],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982705,0.00080791407,0.00008590475,0.00023296858,0.00046672765,0.00013589182],"domain_scores_gemma":[0.9980342,0.0013787082,0.00022392934,0.00004302864,0.00027773366,0.000042499167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002389602,0.0012685879,0.0012048853,0.0013998456,0.0005251752,0.0021669855,0.0019041881,0.001477862,0.0020169972],"category_scores_gemma":[0.0042986535,0.00096249906,0.001522109,0.0017746312,0.0008300522,0.0018915434,0.0011309282,0.0016745189,0.00037076973],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000096220965,0.000020157733,0.00024186983,0.000034845423,0.000016608867,0.00004641678,0.000021616708,0.9800744,0.00024343465,0.014581055,0.00016099501,0.004548971],"study_design_scores_gemma":[0.0000016842463,0.000010209416,0.000040308347,0.0000029122873,0.0000034144796,0.000008523652,0.000004342794,0.99701655,0.000054145872,0.0027054986,0.00014839004,0.000003981476],"about_ca_topic_score_codex":0.0072940895,"about_ca_topic_score_gemma":0.0049794335,"teacher_disagreement_score":0.0072940895,"about_ca_system_score_codex":0.0015349407,"about_ca_system_score_gemma":0.002408144,"threshold_uncertainty_score":0.014503241},"labels":[],"label_agreement":null},{"id":"W3096846721","doi":"10.1177/1087724x20969164","title":"Identifying Actions to Control and Mitigate the Effects of the COVID-19 Pandemic on Construction Organizations: Preliminary Findings","year":2020,"lang":"en","type":"article","venue":"Public Works Management & Policy","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":57,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Pandemic; Coronavirus disease 2019 (COVID-19); Business; Work (physics); Control (management); Coping (psychology); 2019-20 coronavirus outbreak; Severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2); Public relations; Environmental planning; Process management; Engineering; Political science; Economics; Management; Infectious disease (medical specialty); Geography; Psychology","score_opus":0.07732309494311702,"score_gpt":0.3549714635264557,"score_spread":0.2776483685833387,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3096846721","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97720796,0.00048613446,0.0014987967,0.0037432618,0.000024471585,0.001189217,0.00032181237,0.000019991037,0.015508383],"genre_scores_gemma":[0.9939262,0.0008652868,0.0029152508,0.0005355561,0.000011675217,0.00051962706,0.00019770575,0.0000029412172,0.0010257079],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99416673,0.0029357998,0.00038702216,0.00029140088,0.00073505106,0.0014839224],"domain_scores_gemma":[0.96414554,0.019325823,0.0053250142,0.00093960046,0.007537233,0.0027267777],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009747444,0.0006128364,0.0003719396,0.0015885268,0.0027071596,0.0027799082,0.00091481366,0.0013506197,0.002719234],"category_scores_gemma":[0.028308997,0.00039401458,0.000560262,0.0013207858,0.0013609508,0.002941611,0.0029256926,0.0016143789,0.00035439734],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025983938,0.0027180093,0.8324124,0.0014487688,0.000115766896,0.00063942216,0.061850127,0.001261345,0.0015040501,0.002242715,0.0030704704,0.09247698],"study_design_scores_gemma":[0.000032875414,0.0011241355,0.5613607,0.0009993715,0.00010060538,0.0000888273,0.4260705,0.0011190482,0.0008644713,0.0009392808,0.007257103,0.000043091735],"about_ca_topic_score_codex":0.027562454,"about_ca_topic_score_gemma":0.062494174,"teacher_disagreement_score":0.027562454,"about_ca_system_score_codex":0.003347794,"about_ca_system_score_gemma":0.016512519,"threshold_uncertainty_score":0.054804027},"labels":[],"label_agreement":null},{"id":"W3097298738","doi":"10.1016/j.ijproman.2020.10.005","title":"Cross-learning between project management and international development: Analysis and research agenda","year":2020,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":68,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Project management; Centrality; Work (physics); International development; Political science; Program management; Extreme project management; OPM3; Domain (mathematical analysis); Project charter; Engineering management; Engineering; Process management; Systems engineering","score_opus":0.27488372815007556,"score_gpt":0.49727560374613494,"score_spread":0.22239187559605939,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3097298738","genre_codex":"empirical","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8987691,0.00799732,0.016983187,0.009870038,0.00012752037,0.0001027729,0.0001397049,0.000052268322,0.0659582],"genre_scores_gemma":[0.99511826,0.0012652267,0.001536706,0.00018271526,0.000045068304,0.000040440253,0.000049224018,0.0000095377445,0.0017528891],"study_design_codex":"observational","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99254096,0.0046236804,0.00017719991,0.0005538812,0.0008595834,0.0012446062],"domain_scores_gemma":[0.92764485,0.05422956,0.006442893,0.0019864233,0.004673238,0.0050230827],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010135908,0.0004316486,0.00073373294,0.0031495178,0.0017947032,0.00873836,0.0018016264,0.0014955428,0.010116335],"category_scores_gemma":[0.036181465,0.00029925493,0.0005293851,0.0059856987,0.0034643356,0.010879485,0.006909559,0.0017637778,0.0005407412],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003340931,0.0023206943,0.48876932,0.0007056534,0.00061428675,0.00067489495,0.01181577,0.008576232,0.0004063492,0.22841094,0.0025738208,0.2547979],"study_design_scores_gemma":[0.000051799074,0.00070100155,0.52412826,0.0024027321,0.0003654047,0.0005883724,0.1140187,0.030970255,0.0016036737,0.29943734,0.025601126,0.0001313539],"about_ca_topic_score_codex":0.014244631,"about_ca_topic_score_gemma":0.014063131,"teacher_disagreement_score":0.014244631,"about_ca_system_score_codex":0.005088609,"about_ca_system_score_gemma":0.007136435,"threshold_uncertainty_score":0.053604424},"labels":[],"label_agreement":null},{"id":"W3097652792","doi":"10.5539/jsd.v13n6p86","title":"Evaluation of Contractors’ Financial Ability: A Remedy for Performance of Road Construction Infrastructural Projects for Sustainable Cities","year":2020,"lang":"en","type":"article","venue":"Journal of Sustainable Development","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workmanship; Business; Sample (material); Finance; Quality (philosophy); Road construction; Population; Service (business); Operations management; Transport engineering; Engineering; Marketing","score_opus":0.0828735855382905,"score_gpt":0.3327285718956405,"score_spread":0.24985498635734998,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3097652792","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9915515,0.00020168204,0.00048361995,0.00092956616,0.000014569975,0.00006604551,0.000074162126,0.0000055011974,0.0066733095],"genre_scores_gemma":[0.99924755,0.000066771434,0.00034286163,0.000015531374,0.0000050803437,0.000013122694,0.000020003843,5.7240874e-7,0.00028855147],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9945051,0.002463355,0.0005162645,0.00017883701,0.0015487825,0.00078760396],"domain_scores_gemma":[0.9748819,0.004178046,0.011985807,0.00074135774,0.0042956714,0.0039172447],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0068695075,0.00027305752,0.00017479899,0.0020164635,0.0016906671,0.0022312158,0.00083868037,0.00034878493,0.0028159313],"category_scores_gemma":[0.022681871,0.00018306873,0.00021834031,0.0022600924,0.0012552016,0.0012278482,0.0017775352,0.00073244364,0.0002170592],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048347727,0.00014804452,0.9500756,0.00007894917,0.00002505335,0.00021732123,0.0033968717,0.00038696942,0.00033558052,0.00059371395,0.0010124719,0.043681085],"study_design_scores_gemma":[0.0000032018559,0.0001842496,0.97769916,0.00012772957,0.000011964523,0.0001293225,0.018095922,0.0010963748,0.00027466807,0.00021920407,0.0021366298,0.000021549373],"about_ca_topic_score_codex":0.0133450935,"about_ca_topic_score_gemma":0.03267364,"teacher_disagreement_score":0.0133450935,"about_ca_system_score_codex":0.002026121,"about_ca_system_score_gemma":0.0057086456,"threshold_uncertainty_score":0.036329865},"labels":[],"label_agreement":null},{"id":"W3103258575","doi":"10.1061/9780784482858.006","title":"Developing a Risk Breakdown Matrix for the Construction of On-Shore Wind Farm Projects","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","funders":"","keywords":"Shore; Matrix (chemical analysis); Marine engineering; Computer science; Engineering; Geology; Oceanography; Materials science","score_opus":0.2666998951705477,"score_gpt":0.4642639509443384,"score_spread":0.19756405577379071,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3103258575","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.065989085,0.0003221701,0.92236245,0.00068592076,0.00005951244,0.0007404239,0.0018739767,0.00072909734,0.007237351],"genre_scores_gemma":[0.25366247,0.00033101288,0.74219435,0.00005444735,0.000020803234,0.00060097553,0.0018333596,0.000041645788,0.0012609758],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99588335,0.0012305011,0.0005737873,0.00054725114,0.0015110134,0.00025407423],"domain_scores_gemma":[0.988948,0.0055331024,0.0020218769,0.0004948949,0.0026241797,0.00037806426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003355403,0.0010470444,0.0005372464,0.0077637974,0.0008556886,0.0027707864,0.0010908922,0.00092868437,0.0036545056],"category_scores_gemma":[0.01590413,0.0005706863,0.0013881947,0.0035919414,0.00066197687,0.0027698602,0.00199583,0.0016397054,0.0006693065],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026003385,0.00036460967,0.04506892,0.0012613167,0.0002624913,0.0017619386,0.0037009777,0.41816297,0.008689312,0.09150889,0.0076396465,0.4213188],"study_design_scores_gemma":[0.00003005943,0.00019307481,0.011441869,0.0002969737,0.00008066929,0.0005864209,0.0029669546,0.9168917,0.0028307554,0.05004398,0.014522454,0.00011508251],"about_ca_topic_score_codex":0.012705398,"about_ca_topic_score_gemma":0.013735466,"teacher_disagreement_score":0.012705398,"about_ca_system_score_codex":0.002449734,"about_ca_system_score_gemma":0.0024576623,"threshold_uncertainty_score":0.025262892},"labels":[],"label_agreement":null},{"id":"W3105571447","doi":"10.1061/9780784482889.134","title":"Owner and Contractor Choices and Dilemmas: Contemporary Project Delivery Options","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Kingston Health Sciences Centre","funders":"","keywords":"Computer science; Integrated project delivery; Business; Engineering management; Knowledge management; Risk analysis (engineering); Project management; Process management; Systems engineering; Engineering","score_opus":0.3122030710026509,"score_gpt":0.4423906169987136,"score_spread":0.13018754599606275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3105571447","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47287202,0.004513471,0.10208751,0.07697905,0.0003288918,0.0005307951,0.00009468498,0.00010557787,0.34248802],"genre_scores_gemma":[0.9836954,0.0011165936,0.007691154,0.00095678295,0.000056813562,0.00021200028,0.000021595708,0.00004896785,0.0062008286],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.8469739,0.12304096,0.0031292248,0.0037700094,0.015189741,0.007896162],"domain_scores_gemma":[0.92928714,0.053019468,0.004767578,0.002012599,0.0054589002,0.005454269],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.10009652,0.0006454349,0.0005995344,0.003632411,0.015818197,0.024350302,0.0030884908,0.00621395,0.007318443],"category_scores_gemma":[0.0833258,0.0010766279,0.00069705787,0.0038441834,0.03762702,0.018731577,0.009484943,0.0046666972,0.0007234304],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013301388,0.00016399244,0.009691827,0.00026503057,0.000039552302,0.0016810275,0.17345016,0.002873141,0.00038069978,0.74115336,0.007389988,0.06277824],"study_design_scores_gemma":[0.000067738794,0.00020953045,0.003969985,0.00063390494,0.000028571025,0.0013067896,0.4978991,0.0050902385,0.00050406286,0.32490382,0.16524781,0.0001383954],"about_ca_topic_score_codex":0.0077394117,"about_ca_topic_score_gemma":0.007937986,"teacher_disagreement_score":0.10009652,"about_ca_system_score_codex":0.012200917,"about_ca_system_score_gemma":0.017056273,"threshold_uncertainty_score":0.5293673},"labels":[],"label_agreement":null},{"id":"W3112410207","doi":"10.1139/cjce-2020-0527","title":"A meta-analysis of critical causes of project delay using Spearman’s rank and relative importance index integrated approach","year":2020,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Rank correlation; Spearman's rank correlation coefficient; Rank (graph theory); Task (project management); Computer science; Index (typography); Meta-analysis; Risk analysis (engineering); Operations research; Statistics; Mathematics; Engineering; Business; Systems engineering; Medicine","score_opus":0.20274526103993343,"score_gpt":0.33830753166138205,"score_spread":0.13556227062144863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3112410207","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012700492,0.9730083,0.008269828,0.00072728406,0.0004227796,0.0014994529,0.0025863613,0.00009230459,0.0006932114],"genre_scores_gemma":[0.47337142,0.4867337,0.02636588,0.0010327889,0.000493862,0.007933756,0.0032395972,0.00010775942,0.00072121574],"study_design_codex":"meta_analysis","study_design_gemma":"meta_analysis","domain_scores_codex":[0.9544772,0.025540402,0.010954786,0.0034255702,0.004897719,0.0007043106],"domain_scores_gemma":[0.87800753,0.10531304,0.00808381,0.0025332472,0.00547309,0.00058922573],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.044745967,0.0030933393,0.014620664,0.024526149,0.0010041044,0.004360614,0.0025143463,0.0020219686,0.0031807323],"category_scores_gemma":[0.12065984,0.0013264131,0.058941435,0.016830303,0.0008973351,0.0028421825,0.0021294379,0.002425438,0.0002694406],"study_design_candidate":"meta_analysis","study_design_consensus":"meta_analysis","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011304867,0.000030227624,0.009550192,0.25560954,0.7092112,0.00017755106,0.00017466277,0.0014659844,0.00023897932,0.0006097097,0.0007604415,0.021041043],"study_design_scores_gemma":[0.00033885313,0.00029024458,0.00493209,0.021590356,0.96841866,0.00013490664,0.0001025442,0.0007020963,0.00022201995,0.0008498311,0.0023732805,0.000045150722],"about_ca_topic_score_codex":0.008592704,"about_ca_topic_score_gemma":0.013679803,"teacher_disagreement_score":0.044745967,"about_ca_system_score_codex":0.0054475307,"about_ca_system_score_gemma":0.008325949,"threshold_uncertainty_score":0.23664212},"labels":[],"label_agreement":null},{"id":"W3112602785","doi":"10.5430/ijba.v12n1p1","title":"Knowledge Management as Support for Innovation of Public Projects","year":2020,"lang":"en","type":"article","venue":"International Journal of Business Administration","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Knowledge management; Knowledge sharing; Business; Asset (computer security); Knowledge value chain; Innovation management; Personal knowledge management; Service (business); Process (computing); Knowledge economy; Product (mathematics); Organizational learning; Computer science; Marketing","score_opus":0.24651135856056192,"score_gpt":0.43141434795176503,"score_spread":0.18490298939120312,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3112602785","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6625598,0.00085150724,0.031282954,0.008163633,0.000118252436,0.00074766146,0.00012239098,0.0003265151,0.29582736],"genre_scores_gemma":[0.98720586,0.00025183128,0.007987746,0.00012687471,0.00003424388,0.00014436102,0.000047550126,0.000013704915,0.0041877525],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9937412,0.0040118312,0.00023466964,0.00024408159,0.0012512044,0.0005169721],"domain_scores_gemma":[0.98502076,0.008761146,0.0024806538,0.0012372972,0.0013927621,0.00110732],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00364686,0.0002239613,0.00021480538,0.002095843,0.0018654446,0.0047849426,0.00082043145,0.0009138606,0.0033522488],"category_scores_gemma":[0.018201998,0.00014960043,0.00026846927,0.0015349552,0.0016979454,0.0031953098,0.002912976,0.0006940309,0.00044648175],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027259815,0.0014883307,0.039219674,0.0013528916,0.00007658033,0.0013801678,0.05116946,0.0030952867,0.006329034,0.1459733,0.010655168,0.7389875],"study_design_scores_gemma":[0.00023037016,0.0020532866,0.18895023,0.0030347607,0.00029388786,0.0022312738,0.15766388,0.030036323,0.012973156,0.15218785,0.45009744,0.000247578],"about_ca_topic_score_codex":0.0008110463,"about_ca_topic_score_gemma":0.0010184097,"teacher_disagreement_score":0.0047849426,"about_ca_system_score_codex":0.00223851,"about_ca_system_score_gemma":0.005254665,"threshold_uncertainty_score":0.019286692},"labels":[],"label_agreement":null},{"id":"W3112873111","doi":"10.1109/tem.2020.3040526","title":"Moving Beyond the Planning Fallacy: The Emergence of a New Principle of Project Behavior","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Engineering Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":91,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Copenhagen Business School","keywords":"Fallacy; Computer science; Epistemology; Management science; Sociology; Economics; Philosophy","score_opus":0.09013560155473088,"score_gpt":0.34018523860980765,"score_spread":0.25004963705507677,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3112873111","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.047517672,0.0032897026,0.7096271,0.07969682,0.00068380876,0.00021381052,0.00017444964,0.0003823719,0.15841429],"genre_scores_gemma":[0.8511596,0.0015115994,0.13487943,0.003704579,0.0005485008,0.0006285541,0.00010505967,0.0004521461,0.007010553],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.96959025,0.01646933,0.0013797742,0.0049314215,0.006230882,0.0013983578],"domain_scores_gemma":[0.9566932,0.02840865,0.0038481918,0.006384629,0.0032198771,0.0014455721],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.032635372,0.0011729448,0.0017100297,0.002783272,0.004848984,0.017341373,0.004557675,0.00691681,0.0040526055],"category_scores_gemma":[0.047339436,0.0011037923,0.0017497597,0.002453985,0.0661106,0.028797893,0.008345508,0.012158567,0.0008400461],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012346628,0.0000138125415,0.00042954893,0.00003122135,0.000009301007,0.000023978177,0.0021716258,0.001302499,0.00008211755,0.9889157,0.00056088105,0.0064469893],"study_design_scores_gemma":[0.000008304222,0.000017149687,0.00019843839,0.000041577456,0.0000036685587,0.000025215455,0.00037400643,0.00295498,0.00007724535,0.98980534,0.0064806496,0.000013497142],"about_ca_topic_score_codex":0.0049321502,"about_ca_topic_score_gemma":0.0029280805,"teacher_disagreement_score":0.032635372,"about_ca_system_score_codex":0.010054638,"about_ca_system_score_gemma":0.008595512,"threshold_uncertainty_score":0.17259443},"labels":[],"label_agreement":null},{"id":"W3115850080","doi":"10.7492/ijaec.2020.032","title":"Contractual Governance for BIM-enabled Projects: BIM Maturity, Contract Specificity and Performance","year":2020,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Corporate governance; Maturity (psychological); Building information modeling; Business; Process management; Engineering; Operations management; Finance; Political science","score_opus":0.026145113336984216,"score_gpt":0.2702756996262789,"score_spread":0.24413058628929468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3115850080","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9205444,0.0003591885,0.04194891,0.0021892092,0.000013820778,0.00011668597,0.000055573204,0.00006954943,0.034702614],"genre_scores_gemma":[0.99821055,0.000023006289,0.0014434817,0.000012535745,0.0000022296238,0.000013090998,0.000020311887,0.0000051753264,0.0002696168],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.98423195,0.008686734,0.0010856466,0.0007201456,0.0038136414,0.0014618178],"domain_scores_gemma":[0.9233472,0.034352534,0.016071592,0.007965741,0.014129304,0.004133691],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03217212,0.00021942449,0.0002612055,0.00181614,0.0012000215,0.008179886,0.0010132457,0.0014374809,0.002015113],"category_scores_gemma":[0.08678243,0.00036927476,0.00020478516,0.0019163467,0.0029674596,0.008284544,0.0042131003,0.0015087166,0.00029733617],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00055375736,0.00096790213,0.34154734,0.00018695826,0.0001120333,0.00023535617,0.022634245,0.034527943,0.005016669,0.38894802,0.0020688474,0.20320089],"study_design_scores_gemma":[0.00008532921,0.0007927775,0.42141163,0.00057231786,0.000101126665,0.00044484535,0.034543335,0.19753848,0.009745488,0.31554934,0.019038936,0.00017630355],"about_ca_topic_score_codex":0.0047061336,"about_ca_topic_score_gemma":0.0045859925,"teacher_disagreement_score":0.03217212,"about_ca_system_score_codex":0.0041562202,"about_ca_system_score_gemma":0.006535013,"threshold_uncertainty_score":0.1701445},"labels":[],"label_agreement":null},{"id":"W3117875228","doi":"10.1177/8756972820977225","title":"Executives’ Decision Processes at the Front End of Major Projects: The Role of Context and Experience in Value Creation","year":2020,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; Mount Royal University","funders":"","keywords":"Context (archaeology); Value (mathematics); Business; Process management; Knowledge management; Marketing; Computer science","score_opus":0.055150212243964256,"score_gpt":0.3450328862882121,"score_spread":0.28988267404424783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3117875228","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98904574,0.00012865516,0.0024522515,0.00032753733,0.0000050774934,0.000018259472,0.000004739448,0.000004621559,0.008013161],"genre_scores_gemma":[0.9989889,0.0000578301,0.0005587103,0.000021327729,0.00000158281,0.000005274087,0.0000034760521,0.0000016798642,0.0003611477],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99405694,0.004371454,0.000121455225,0.00022701516,0.00047530513,0.0007477578],"domain_scores_gemma":[0.9896762,0.007401107,0.0011714083,0.0003806551,0.000475015,0.00089570176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0059170066,0.00032453422,0.00021746314,0.00087717315,0.00259199,0.0048791575,0.0005234837,0.0007079186,0.0019063951],"category_scores_gemma":[0.013855979,0.0002667384,0.00020216299,0.0005867788,0.004370338,0.003126679,0.003104885,0.0012289516,0.0001817474],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046142066,0.00067420607,0.13041013,0.00022496213,0.00005306876,0.0065034362,0.7233898,0.0027265954,0.0043510864,0.036939733,0.001007799,0.09325787],"study_design_scores_gemma":[0.000054548065,0.000578912,0.07699106,0.0004383978,0.000041173902,0.001615803,0.86367583,0.003927004,0.0030859322,0.023550289,0.025936402,0.000104654864],"about_ca_topic_score_codex":0.0017756391,"about_ca_topic_score_gemma":0.0035407888,"teacher_disagreement_score":0.0059170066,"about_ca_system_score_codex":0.0013922096,"about_ca_system_score_gemma":0.0020065315,"threshold_uncertainty_score":0.031292558},"labels":[],"label_agreement":null},{"id":"W3117924034","doi":"10.1080/13504509.2020.1867251","title":"Assessing risk management in Brazilian social projects: a path towards sustainable development","year":2020,"lang":"en","type":"article","venue":"International Journal of Sustainable Development & World Ecology","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"Conselho Nacional de Desenvolvimento Científico e Tecnológico","keywords":"TOPSIS; Context (archaeology); Relevance (law); Preference; Order (exchange); Business; Rank (graph theory); Sustainable development; Project management; Risk management; Social responsibility; Knowledge management; Marketing; Public relations; Computer science; Political science; Engineering; Management; Operations research; Economics; Geography; Mathematics","score_opus":0.0511793493761369,"score_gpt":0.3530838086844141,"score_spread":0.3019044593082772,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3117924034","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8976666,0.0053386465,0.033393998,0.015171305,0.000094492556,0.0006781249,0.00016946859,0.00010484359,0.047382653],"genre_scores_gemma":[0.9828723,0.0017460481,0.014421928,0.00011656,0.000012576227,0.00009726375,0.000039673316,0.000007366481,0.0006862021],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9903314,0.006292477,0.00045458195,0.00033026407,0.0019999186,0.0005913794],"domain_scores_gemma":[0.9848838,0.006104188,0.0029518683,0.00069620355,0.0041228505,0.0012410708],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013940174,0.00077068637,0.00041626906,0.0025617662,0.0019406279,0.0038001433,0.0008773479,0.0009277566,0.0012916859],"category_scores_gemma":[0.0258031,0.00037286067,0.00040027534,0.0025094263,0.002223043,0.0027968425,0.004019547,0.0008985963,0.00014832758],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012899483,0.000399227,0.29993626,0.0021591415,0.00014816166,0.0012934239,0.09645084,0.0040414548,0.0046675857,0.040616397,0.003754635,0.5464038],"study_design_scores_gemma":[0.00003456921,0.0008261752,0.47472155,0.0061749388,0.00018972765,0.0021512015,0.30301756,0.013387054,0.0033576388,0.057900436,0.138036,0.00020316524],"about_ca_topic_score_codex":0.014161006,"about_ca_topic_score_gemma":0.024274565,"teacher_disagreement_score":0.014161006,"about_ca_system_score_codex":0.0036539778,"about_ca_system_score_gemma":0.010936502,"threshold_uncertainty_score":0.073723555},"labels":[],"label_agreement":null},{"id":"W3118570763","doi":"","title":"Project and portfolio management: a multilayer framework to support innovation-driven SMEs in the industry of construction and building materials. Case of Canada","year":2019,"lang":"en","type":"dissertation","venue":"RepositóriUM (Universidade do Minho)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Construction industry; Portfolio; Project portfolio management; Industrial organization; Innovation management; Knowledge management; Engineering management; Construction engineering; Engineering; Project management; Marketing; Systems engineering; Computer science; Finance","score_opus":0.027894825238293883,"score_gpt":0.32776828604463015,"score_spread":0.29987346080633626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3118570763","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6367808,0.0015242418,0.13720948,0.014985205,0.000075988624,0.0007564392,0.00032221992,0.00030633144,0.20803934],"genre_scores_gemma":[0.95848894,0.0005047469,0.03192873,0.000086108186,0.000008876665,0.000083100895,0.000077093966,0.000010764063,0.008811544],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99844307,0.0006822754,0.00008114683,0.00008259797,0.00034566637,0.00036531518],"domain_scores_gemma":[0.9984523,0.00043478166,0.000114441,0.00011649367,0.00032132064,0.00056068023],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034956597,0.00028129102,0.00018609245,0.0015571306,0.0023028858,0.0061016986,0.0010125379,0.00096387,0.002813596],"category_scores_gemma":[0.004397131,0.00014894822,0.00023153935,0.0021169127,0.0014765918,0.0023303905,0.0040411684,0.00067255343,0.00027780308],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020415509,0.0007054876,0.035696313,0.0002840165,0.00009759214,0.0013222974,0.014774841,0.05406513,0.0038028033,0.40584752,0.009330765,0.4738691],"study_design_scores_gemma":[0.00018972154,0.0006704777,0.08475143,0.0011411797,0.00027029347,0.0010422333,0.07419801,0.31216934,0.006750021,0.2476583,0.2709571,0.00020200569],"about_ca_topic_score_codex":0.19763538,"about_ca_topic_score_gemma":0.2595264,"teacher_disagreement_score":0.8023646,"about_ca_system_score_codex":0.008740735,"about_ca_system_score_gemma":0.025554713,"threshold_uncertainty_score":0.39297003},"labels":[],"label_agreement":null},{"id":"W3118838891","doi":"10.1109/emr.2021.3049158","title":"A Rising Tide Lifts All Boats, Ignoring Risks Can Sink Them: The Peril of Rework in Large-Scale Transport Projects","year":2021,"lang":"en","type":"article","venue":"IEEE Engineering Management Review","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Australian Research Council","keywords":"Rework; Scale (ratio); Business; Public sector; Risk analysis (engineering); Work (physics); Private sector; Operations management; Industrial organization; Engineering; Economics; Economy; Economic growth","score_opus":0.10950325973221318,"score_gpt":0.3430844279981383,"score_spread":0.23358116826592512,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3118838891","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.073136576,0.25516927,0.02484938,0.5730615,0.003911049,0.00029629737,0.00027936403,0.00017973776,0.06911677],"genre_scores_gemma":[0.62189543,0.2994139,0.018131433,0.03969735,0.0029775063,0.00023878159,0.00024695694,0.00017404018,0.01722462],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.96339756,0.022178287,0.0014445318,0.0010121731,0.010670353,0.0012971009],"domain_scores_gemma":[0.89633334,0.065533265,0.011185876,0.002291456,0.021874709,0.0027814151],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.038556416,0.00060008926,0.0007874697,0.0034067738,0.0030909905,0.010451865,0.0013112413,0.0041267485,0.0033778131],"category_scores_gemma":[0.08154304,0.0004928544,0.00082800107,0.0032925976,0.005551746,0.009028608,0.002625245,0.0056809676,0.0010920411],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026573043,0.00028332116,0.019127345,0.0050169546,0.0005263334,0.00097404665,0.005633193,0.004704263,0.00089396763,0.09787457,0.13289884,0.73180145],"study_design_scores_gemma":[0.00007784335,0.0011344762,0.04004678,0.01608205,0.0004657684,0.0014127404,0.0306617,0.0037651528,0.0020581568,0.09987527,0.8041003,0.00031980211],"about_ca_topic_score_codex":0.014719039,"about_ca_topic_score_gemma":0.035768885,"teacher_disagreement_score":0.038556416,"about_ca_system_score_codex":0.005067768,"about_ca_system_score_gemma":0.0120729245,"threshold_uncertainty_score":0.2039082},"labels":[],"label_agreement":null},{"id":"W3119199326","doi":"10.29173/mocs178","title":"Modularization Business Case: Process Flowchart and Major Considerations","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular programming; Flowchart; Computer science; Schedule; Process (computing); Process management; Risk analysis (engineering); Software engineering; Engineering; Business; Programming language","score_opus":0.06703827011217275,"score_gpt":0.3142190966494526,"score_spread":0.24718082653727982,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3119199326","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07162753,0.000660185,0.75206566,0.009584867,0.0002560727,0.010870296,0.001807517,0.0032117595,0.14991611],"genre_scores_gemma":[0.2666376,0.0010608919,0.6899168,0.0007225098,0.00006430485,0.00428464,0.0015105164,0.0002658612,0.035536867],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99628025,0.0013802904,0.00019837405,0.00030114016,0.0014974568,0.00034257796],"domain_scores_gemma":[0.99284405,0.0045812135,0.0004892661,0.0004975561,0.0012500408,0.00033786174],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006008851,0.0009239827,0.00036121416,0.002493654,0.0018504437,0.0062854,0.0017101511,0.0022667528,0.014031854],"category_scores_gemma":[0.009734715,0.0006770084,0.00057791383,0.0019808984,0.0017773372,0.0041750115,0.0015652501,0.0018779463,0.0029645152],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005207376,0.001887626,0.0057569398,0.00077227067,0.000021145377,0.0045771734,0.009549256,0.056548182,0.019380258,0.6648137,0.02530291,0.21086982],"study_design_scores_gemma":[0.00031070376,0.0010312904,0.0075835497,0.0018152174,0.000049035832,0.002483011,0.0072081652,0.22738162,0.03448943,0.19088367,0.5264221,0.00034229262],"about_ca_topic_score_codex":0.008466137,"about_ca_topic_score_gemma":0.0073442548,"teacher_disagreement_score":0.014031854,"about_ca_system_score_codex":0.004567642,"about_ca_system_score_gemma":0.0073620435,"threshold_uncertainty_score":0.04694122},"labels":[],"label_agreement":null},{"id":"W3121230920","doi":"","title":"The Core Competencies of Effective Project Execution: The Challenge of Diversity","year":2001,"lang":"en","type":"article","venue":"Research Explorer (The University of Manchester)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Core competency; Flexibility (engineering); Core (optical fiber); Portfolio; Project portfolio management; Procurement; Business; Diversity (politics); Knowledge management; Process management; Set (abstract data type); Project management; Computer science; Engineering; Marketing; Management; Systems engineering; Political science; Economics","score_opus":0.35675751950247503,"score_gpt":0.40006453626642285,"score_spread":0.043307016763947825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121230920","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5086115,0.004485848,0.22202949,0.048409857,0.00015149603,0.0005088392,0.00009301384,0.00013181535,0.21557814],"genre_scores_gemma":[0.96401167,0.00087892986,0.032468148,0.00040961168,0.00004240463,0.0001662807,0.000026430343,0.000024593159,0.0019719272],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9826355,0.00991731,0.0007517515,0.0008702408,0.003518709,0.0023063926],"domain_scores_gemma":[0.9663916,0.01683042,0.0031348804,0.0027262247,0.0030763552,0.007840413],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019347396,0.00046906323,0.0005598657,0.001768931,0.004005687,0.010053346,0.001568221,0.0020200163,0.0016052243],"category_scores_gemma":[0.037017632,0.00039701042,0.0002945412,0.001325254,0.013361905,0.009157625,0.013047242,0.00291035,0.0004165338],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010939794,0.0002754516,0.016594777,0.0004821154,0.00003742401,0.00044058918,0.025046252,0.011559796,0.0018157923,0.7171265,0.0031872161,0.22332473],"study_design_scores_gemma":[0.00006887097,0.00024792002,0.013598617,0.00071241526,0.000015182277,0.0006074003,0.024225937,0.01001676,0.0018651597,0.9104071,0.038171276,0.00006323398],"about_ca_topic_score_codex":0.0032142575,"about_ca_topic_score_gemma":0.0031875263,"teacher_disagreement_score":0.019347396,"about_ca_system_score_codex":0.003922622,"about_ca_system_score_gemma":0.018338615,"threshold_uncertainty_score":0.102320075},"labels":[],"label_agreement":null},{"id":"W3121739452","doi":"10.4102/sajems.v18i1.818","title":"Cost-effective infrastructure choices in education: Location, build or repair","year":2015,"lang":"en","type":"article","venue":"South African Journal of Economic and Management Sciences","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Ranking (information retrieval); Counterfactual thinking; Budget constraint; Order (exchange); Constraint (computer-aided design); Key (lock); Business; Yield (engineering); Capital budgeting; Environmental economics; Computer science; Operations management; Actuarial science; Risk analysis (engineering); Economics; Finance; Engineering; Microeconomics","score_opus":0.07619968256577275,"score_gpt":0.3618981380398329,"score_spread":0.28569845547406014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121739452","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47000074,0.0017839902,0.45502546,0.0047534117,0.00016947648,0.0008755544,0.005040794,0.00031636277,0.062034264],"genre_scores_gemma":[0.94707286,0.0008597366,0.02795195,0.000091846145,0.00003556325,0.0003567489,0.0005426046,0.000056268673,0.023032377],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9985422,0.00070202857,0.000047688885,0.000247307,0.00013801617,0.0003228015],"domain_scores_gemma":[0.9971884,0.0020883433,0.00032824918,0.00010362631,0.00011656911,0.00017478847],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019314637,0.00094295375,0.0015526318,0.0010605984,0.0005634452,0.003557558,0.0022705311,0.003669511,0.014384424],"category_scores_gemma":[0.0060958285,0.0013606411,0.0011735365,0.002331056,0.0013922739,0.0041425773,0.00094526913,0.0018269775,0.0010274692],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007137167,0.000058121015,0.0011035439,0.000055659108,0.0000121691355,0.00005366551,0.000026947142,0.9765965,0.00018471753,0.015552908,0.00044315364,0.0058413357],"study_design_scores_gemma":[0.00006278547,0.00013854976,0.0020847435,0.000054704728,0.000048069374,0.000078921286,0.00020870949,0.9686771,0.00041168512,0.02476685,0.0034322853,0.000035614838],"about_ca_topic_score_codex":0.017289568,"about_ca_topic_score_gemma":0.020526635,"teacher_disagreement_score":0.017289568,"about_ca_system_score_codex":0.0041626017,"about_ca_system_score_gemma":0.0021526334,"threshold_uncertainty_score":0.048120677},"labels":[],"label_agreement":null},{"id":"W3122198629","doi":"10.5539/jms.v6n3p34","title":"Innovation Management in South Africa: An Inquiry","year":2016,"lang":"en","type":"article","venue":"Journal of Management and Sustainability","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Innovation management; Standardization; Knowledge management; Business; Ambiguity; Context (archaeology); Process (computing); Product innovation; Process management; Marketing; Political science; Computer science; Geography","score_opus":0.08346446528909399,"score_gpt":0.36405107507523365,"score_spread":0.2805866097861397,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3122198629","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9756992,0.0017793948,0.0011396415,0.006416977,0.000029668276,0.00023008234,0.00003061244,0.000003978117,0.014670485],"genre_scores_gemma":[0.9932,0.0022304307,0.0010214548,0.0005998834,0.000011930297,0.00021353996,0.000011640459,0.0000035343164,0.002707598],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9958169,0.0027054616,0.00017693464,0.00021317697,0.00032993828,0.0007577168],"domain_scores_gemma":[0.9951414,0.003617303,0.0005756492,0.00007088187,0.00021403511,0.00038078148],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0054243854,0.00030792592,0.00037114616,0.002104916,0.009182958,0.0047026533,0.00063692254,0.0016102003,0.0018632058],"category_scores_gemma":[0.0067018187,0.00042844994,0.00024364903,0.0020095923,0.005105955,0.0038826098,0.004772035,0.0017459024,0.00014743205],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022367962,0.00008478169,0.0069938437,0.00035147404,0.000005361767,0.0013488792,0.9604333,0.00010756115,0.0013014174,0.015270889,0.0005525685,0.013527535],"study_design_scores_gemma":[0.000005800566,0.0000448524,0.0069079804,0.00035204066,0.0000055942255,0.00041852932,0.9608924,0.00017136437,0.0003328486,0.0017336768,0.029126354,0.0000086600785],"about_ca_topic_score_codex":0.008393183,"about_ca_topic_score_gemma":0.011018194,"teacher_disagreement_score":0.009182958,"about_ca_system_score_codex":0.007751971,"about_ca_system_score_gemma":0.009625198,"threshold_uncertainty_score":0.05624473},"labels":[],"label_agreement":null},{"id":"W3122511782","doi":"10.1108/ci-11-2019-0117","title":"Construction process innovation on Brock Commons Tallwood House","year":2021,"lang":"en","type":"article","venue":"Construction Innovation","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Victoria; École de Technologie Supérieure; University of British Columbia","funders":"","keywords":"Operationalization; Process (computing); Engineering; Project team; Commons; Flexibility (engineering); Process management; Engineering management; Architectural engineering; Computer science; Systems engineering; Management","score_opus":0.09460547861259458,"score_gpt":0.36829307560647584,"score_spread":0.27368759699388123,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3122511782","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9232697,0.0003746961,0.008707589,0.0009503999,0.000025467854,0.0006461986,0.00007891368,0.00012225783,0.06582475],"genre_scores_gemma":[0.9713046,0.0003032796,0.010846996,0.0000851215,0.0000070337037,0.00016480521,0.00009044491,0.000025500407,0.017172238],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.99634534,0.0011153148,0.00008754711,0.00037883688,0.0012399107,0.00083312206],"domain_scores_gemma":[0.9954079,0.002155176,0.0002806422,0.00033982363,0.0010931633,0.0007233914],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003913866,0.00032129837,0.00024178842,0.001698395,0.0060360846,0.0035048989,0.0012307509,0.0008047624,0.0045354213],"category_scores_gemma":[0.005612846,0.0002678138,0.00030687056,0.002108935,0.005189814,0.0011358876,0.0030644014,0.0010750665,0.00029248503],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007026784,0.0015767607,0.045195714,0.0010456198,0.000046534806,0.006488232,0.31133172,0.015365314,0.029705107,0.08231455,0.007042066,0.4991857],"study_design_scores_gemma":[0.00011694216,0.0017179003,0.18913025,0.0011092079,0.00009933918,0.001381204,0.38170764,0.01659789,0.030856686,0.011711642,0.36531812,0.000253245],"about_ca_topic_score_codex":0.379624,"about_ca_topic_score_gemma":0.5843676,"teacher_disagreement_score":0.620376,"about_ca_system_score_codex":0.031552535,"about_ca_system_score_gemma":0.032222938,"threshold_uncertainty_score":0.7548287},"labels":[],"label_agreement":null},{"id":"W3125442429","doi":"10.13033/isahp.y2011.037","title":"USING MULTI-CRITERIA DECISION MAKING TO DETERMINE THE CRITICAL SUCCESS FACTORS FOR PROCUREMENT OF CAPITAL PROJECTS UNDER PUBLIC-PRIVATE PARTNERSHIPS","year":2011,"lang":"en","type":"article","venue":"ISAHP proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University Canada West","funders":"","keywords":"Procurement; Critical success factor; Business; Capital (architecture); Private capital; Public–private partnership; Industrial organization; Finance; Computer science; Environmental economics; Process management; Marketing; Economics; General partnership; Production (economics); Microeconomics","score_opus":0.5947622811909711,"score_gpt":0.462903173411957,"score_spread":0.13185910777901405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125442429","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8753937,0.00041085586,0.11421313,0.0006022803,0.00003339417,0.002193366,0.00021145417,0.000057950212,0.0068838387],"genre_scores_gemma":[0.9332376,0.00013293052,0.06546663,0.00002758016,0.000013258736,0.0007049089,0.00012982966,0.000007118642,0.00028017408],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.97844774,0.015172945,0.001469057,0.0007470265,0.0030026205,0.0011605438],"domain_scores_gemma":[0.9151405,0.07308028,0.00460713,0.0006335341,0.004741297,0.0017972282],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02826127,0.0013986622,0.0014465421,0.007905702,0.0019602391,0.0051359017,0.0010062496,0.0013335192,0.0025397048],"category_scores_gemma":[0.056759726,0.000614104,0.0017232726,0.0052627465,0.0016291499,0.002217226,0.0020912965,0.001439511,0.00020909331],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0049942164,0.0026138504,0.16934505,0.0027476014,0.0013181601,0.0015723035,0.010937172,0.47244364,0.008574852,0.027276985,0.0017751304,0.29640108],"study_design_scores_gemma":[0.00041853744,0.004760264,0.04847948,0.0007047637,0.00039779674,0.0003714577,0.020281997,0.8650694,0.0073914756,0.049091678,0.0026687293,0.00036447943],"about_ca_topic_score_codex":0.0038176116,"about_ca_topic_score_gemma":0.0046620616,"teacher_disagreement_score":0.02826127,"about_ca_system_score_codex":0.0042861137,"about_ca_system_score_gemma":0.0060004466,"threshold_uncertainty_score":0.14946169},"labels":[],"label_agreement":null},{"id":"W3128007461","doi":"10.1108/ijmpb-03-2020-0102","title":"Customer satisfaction, value for money and repurchase intent in the context of system delivery projects: a longitudinal study","year":2021,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Thompson Rivers University","funders":"","keywords":"Customer satisfaction; Structural equation modeling; Marketing; Loyalty; Loyalty business model; Construct (python library); Customer retention; Social exchange theory; Business; Context (archaeology); Psychology; Social psychology; Computer science; Service quality; Statistics; Mathematics","score_opus":0.10459729351499272,"score_gpt":0.3719730002642649,"score_spread":0.26737570674927214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128007461","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9994265,0.00006165878,0.00014962614,0.000051413586,0.0000024540846,0.000015518519,0.00004854176,0.0000014966166,0.00024278591],"genre_scores_gemma":[0.99911946,0.00007554201,0.0002910284,0.000034598284,0.0000052091086,0.000053945238,0.00010076846,0.0000017707827,0.00031753638],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9973254,0.0014849216,0.00016286143,0.0001842743,0.0004791477,0.000363328],"domain_scores_gemma":[0.98795253,0.004031691,0.0031297198,0.00075937784,0.0021284255,0.0019983305],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006973794,0.00022077133,0.0004000213,0.0010469372,0.0015219302,0.0017750553,0.00048416047,0.00053322734,0.0018566436],"category_scores_gemma":[0.013510168,0.000382488,0.0005817189,0.0012594452,0.0006859063,0.0015560647,0.0013316909,0.0018509483,0.0004134168],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017644258,0.000902185,0.97393304,0.00003246565,0.000035824578,0.00020399124,0.011718243,0.00010698008,0.00037246128,0.00027427834,0.00023745435,0.012006675],"study_design_scores_gemma":[0.000012536403,0.0022930328,0.97440195,0.000063881875,0.000043743323,0.00048483978,0.01974983,0.0011354459,0.00037281815,0.0003279223,0.0010769082,0.000037135527],"about_ca_topic_score_codex":0.0056678923,"about_ca_topic_score_gemma":0.0062859897,"teacher_disagreement_score":0.006973794,"about_ca_system_score_codex":0.00082049554,"about_ca_system_score_gemma":0.0018616819,"threshold_uncertainty_score":0.036881387},"labels":[],"label_agreement":null},{"id":"W3128358719","doi":"10.5539/ies.v14n2p33","title":"Strategies for Improving Quantity Surveyors’ Education Training in Uganda","year":2021,"lang":"en","type":"article","venue":"International Education Studies","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Internship; Curriculum; Training (meteorology); Quality (philosophy); Work (physics); Higher education; Population; Action (physics); Medical education; Public relations; Engineering; Business; Political science; Pedagogy; Psychology; Sociology; Medicine","score_opus":0.3244581541096064,"score_gpt":0.5146801359461893,"score_spread":0.19022198183658295,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128358719","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78622794,0.008366726,0.06374558,0.086359456,0.0017954084,0.0117426,0.00049377145,0.0009773092,0.040291134],"genre_scores_gemma":[0.8854364,0.0038309144,0.0774555,0.010448971,0.00031562275,0.0067935777,0.00022767516,0.00009468448,0.015396572],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.97761863,0.016201679,0.0011403823,0.0008604118,0.0016877956,0.0024912003],"domain_scores_gemma":[0.94991046,0.019516064,0.00619903,0.0029149242,0.0087911505,0.012668473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.04052911,0.0005751569,0.00053088035,0.0028720105,0.0036970307,0.003790555,0.002797392,0.0020781741,0.013486149],"category_scores_gemma":[0.056027394,0.0010465153,0.00054508983,0.0015148433,0.0021151167,0.0052437093,0.012610097,0.0022875986,0.001835121],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00064843055,0.0024373552,0.11056319,0.0063433703,0.000079410966,0.0024024835,0.15091787,0.0018562323,0.006508809,0.009879906,0.028156953,0.680206],"study_design_scores_gemma":[0.0005024346,0.004566677,0.15528902,0.013134034,0.000101996724,0.0011149577,0.28101274,0.0035357706,0.0045445007,0.012356436,0.5235812,0.000260243],"about_ca_topic_score_codex":0.0028373597,"about_ca_topic_score_gemma":0.004576733,"teacher_disagreement_score":0.04052911,"about_ca_system_score_codex":0.0033217394,"about_ca_system_score_gemma":0.02251601,"threshold_uncertainty_score":0.21434104},"labels":[],"label_agreement":null},{"id":"W3129768783","doi":"10.5267/j.jpm.2021.1.002","title":"Identification, evaluation, and allotment of critical risk factors (CRFs) in real estate projects: India as a case study","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Real estate; Context (archaeology); Critical success factor; Business; Real estate development; Property management; Identification (biology); Marketing; Finance; Engineering; Operations management; Geography","score_opus":0.12958245200471585,"score_gpt":0.46100016809268457,"score_spread":0.3314177160879687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129768783","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98499656,0.0002744032,0.005799481,0.00032687339,0.0000089662235,0.00031028842,0.000084101885,0.000026257814,0.008173106],"genre_scores_gemma":[0.992969,0.0003148734,0.005060913,0.000024377598,0.000005334628,0.000053874497,0.00004992218,0.00000464539,0.0015172209],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9967765,0.001425637,0.00020316402,0.00016151989,0.00087449414,0.00055857934],"domain_scores_gemma":[0.992284,0.004070158,0.0011661572,0.00039438417,0.0014690865,0.0006161901],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027735545,0.00049757335,0.0003295009,0.0031285402,0.0016910689,0.0027135734,0.00087270595,0.0010674039,0.0014672986],"category_scores_gemma":[0.004694799,0.00022825887,0.0007453031,0.002788983,0.0014876443,0.000931826,0.0018223494,0.0009216786,0.0001635854],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00082308357,0.004180984,0.45632407,0.0016311236,0.0002317371,0.045832448,0.071184166,0.04769751,0.009122386,0.035193857,0.0068210037,0.32095763],"study_design_scores_gemma":[0.00007216098,0.0028655862,0.48459494,0.00095794216,0.00039475755,0.01581645,0.32331002,0.10249308,0.01620022,0.011018341,0.041988585,0.00028790082],"about_ca_topic_score_codex":0.013395875,"about_ca_topic_score_gemma":0.018888194,"teacher_disagreement_score":0.013395875,"about_ca_system_score_codex":0.002803231,"about_ca_system_score_gemma":0.0036221102,"threshold_uncertainty_score":0.026635826},"labels":[],"label_agreement":null},{"id":"W3129787735","doi":"10.5267/j.jpm.2021.1.003","title":"An interpretive structural modeling approach to enablers of green supply chain management on construction projects","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Intuition; Incentive; Business; Appeal; Supply chain management; Supply chain; Knowledge management; Perspective (graphical); Process management; Marketing; Computer science; Economics; Political science","score_opus":0.07248651904617082,"score_gpt":0.3538489111057097,"score_spread":0.2813623920595389,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129787735","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1978086,0.000494354,0.7242023,0.0036985485,0.000073082934,0.0008739553,0.0008734783,0.00018229111,0.071793415],"genre_scores_gemma":[0.85529816,0.00048966246,0.14065567,0.00009473364,0.000020622709,0.00082368637,0.00030919124,0.000023103212,0.0022852179],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.99596953,0.003352636,0.00010104772,0.00016807087,0.00026974521,0.00013894394],"domain_scores_gemma":[0.9925478,0.0060736355,0.00059788674,0.0002891671,0.00040247163,0.00008901179],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0049066185,0.0008603451,0.0003763088,0.0035508568,0.0010952157,0.0031271412,0.0013009432,0.000948803,0.0035080977],"category_scores_gemma":[0.00913739,0.00039795975,0.00096992706,0.0028522983,0.0022391756,0.0023860536,0.002279156,0.0013297783,0.00019898286],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006608997,0.00025611534,0.020822924,0.0005509407,0.00017712671,0.0008020147,0.022955967,0.1585326,0.0014024209,0.7522203,0.0012068175,0.04100668],"study_design_scores_gemma":[0.000052777967,0.00029181407,0.011025352,0.0009934255,0.0001760239,0.00023144216,0.031458836,0.58317363,0.0010922363,0.34580323,0.02563182,0.000069406364],"about_ca_topic_score_codex":0.009021004,"about_ca_topic_score_gemma":0.01466154,"teacher_disagreement_score":0.009021004,"about_ca_system_score_codex":0.0037988166,"about_ca_system_score_gemma":0.004025689,"threshold_uncertainty_score":0.02756244},"labels":[],"label_agreement":null},{"id":"W3132238482","doi":"10.5267/j.jpm.2021.2.001","title":"Linking entrepreneurial orientation to project success in construction projects","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Proactivity; Entrepreneurial orientation; Moderation; CLARITY; Structural equation modeling; Business; Knowledge management; Marketing; Entrepreneurship; Orientation (vector space); Psychology; Social psychology; Computer science; Mathematics; Statistics","score_opus":0.07990087972434413,"score_gpt":0.38837112759690845,"score_spread":0.30847024787256433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3132238482","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9988574,0.000026722837,0.00016582852,0.00004174273,0.0000020650723,0.000010722537,0.000008615578,8.7545885e-7,0.00088611984],"genre_scores_gemma":[0.99969494,0.00003111356,0.000098313394,0.0000043993405,0.0000014231838,0.000006353619,0.000010139062,5.44189e-7,0.00015281732],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.998324,0.00074274046,0.00012781315,0.00008136899,0.00044036348,0.00028372416],"domain_scores_gemma":[0.984908,0.0055863415,0.0048380233,0.00040689975,0.0011937148,0.0030670925],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024295384,0.00013517529,0.00013083404,0.0006802654,0.00049090415,0.0011330098,0.00016651269,0.00023152675,0.001426592],"category_scores_gemma":[0.010480449,0.00013391058,0.00022358685,0.0005330139,0.0005481745,0.00035913236,0.0011038397,0.0006212797,0.00012277406],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040434785,0.00018391808,0.9890057,0.00001806988,0.000022870743,0.00013004335,0.0008234449,0.00019175607,0.00021301366,0.00020429389,0.0000678325,0.009098656],"study_design_scores_gemma":[0.0000031865977,0.00017258922,0.99582726,0.00002390035,0.000016343638,0.00013194415,0.002571073,0.00043301476,0.0001721559,0.00024245733,0.00039765218,0.000008400107],"about_ca_topic_score_codex":0.001255836,"about_ca_topic_score_gemma":0.0027823825,"teacher_disagreement_score":0.0024295384,"about_ca_system_score_codex":0.00043786713,"about_ca_system_score_gemma":0.0012876402,"threshold_uncertainty_score":0.012848794},"labels":[],"label_agreement":null},{"id":"W3132538454","doi":"10.51594/ijmer.v3i1.200","title":"DETERMINANTS OF THE PERFORMANCE OF DEVELOPMENT PROJECTS IN DEVELOPING COUNTRIES","year":2021,"lang":"en","type":"article","venue":"International Journal of Management & Entrepreneurship Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"","keywords":"Context (archaeology); Project management; Process management; Developing country; Sample (material); Business; Knowledge management; Management science; Computer science; Engineering; Economic growth; Economics; Systems engineering; Geography","score_opus":0.17813863159592094,"score_gpt":0.43862168839640586,"score_spread":0.2604830568004849,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3132538454","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9970925,0.00016974671,0.00026734362,0.00014618254,0.000001494673,0.0000139759795,0.00008136121,0.0000028119973,0.0022244817],"genre_scores_gemma":[0.9996642,0.00011546315,0.000072381205,0.0000033494655,0.0000011857499,0.0000050516996,0.00003772942,7.3430715e-7,0.000099839395],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9976737,0.0012330414,0.00013461137,0.00009200558,0.00041174193,0.0004549256],"domain_scores_gemma":[0.98999727,0.0029535186,0.003582816,0.0002516342,0.0016064221,0.0016082391],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027030588,0.00023818285,0.00019894721,0.0014761271,0.00067050837,0.001860403,0.00017731433,0.00025505945,0.0011723019],"category_scores_gemma":[0.0120728165,0.00013073526,0.00010455155,0.0024577803,0.0006887209,0.0006147763,0.0014653144,0.00045574296,0.0001684644],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033379347,0.0001089524,0.9802619,0.00004522078,0.000029106654,0.00018665825,0.0009786342,0.0018157081,0.00043517005,0.0011727308,0.0002066534,0.014725804],"study_design_scores_gemma":[0.0000025713,0.000047257847,0.9937791,0.000047137666,0.000006456866,0.00007465296,0.0034911116,0.0009199538,0.0001939879,0.00031552665,0.001115756,0.0000064362207],"about_ca_topic_score_codex":0.0061367075,"about_ca_topic_score_gemma":0.0060344776,"teacher_disagreement_score":0.0061367075,"about_ca_system_score_codex":0.0010488974,"about_ca_system_score_gemma":0.0014822693,"threshold_uncertainty_score":0.01429528},"labels":[],"label_agreement":null},{"id":"W3133018202","doi":"10.1109/aike48582.2020.00029","title":"A Predictive Model of Cost Growth in Construction Projects Using Feature Selection","year":2020,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Random forest; Feature selection; Feature engineering; Machine learning; Lasso (programming language); Feature (linguistics); Computer science; Artificial intelligence; Dimensionality reduction; Selection (genetic algorithm); Curse of dimensionality; Data mining; Deep learning","score_opus":0.15538118979595644,"score_gpt":0.34865179678802893,"score_spread":0.1932706069920725,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3133018202","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8150266,0.00059133495,0.17836308,0.0012392607,0.00010846657,0.0001454543,0.002137417,0.00085796556,0.0015304066],"genre_scores_gemma":[0.98536855,0.00018213919,0.011535185,0.000033612036,0.000036364214,0.00011019322,0.0016199695,0.000017072456,0.0010968571],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994241,0.00020633535,0.00003430504,0.00011892381,0.000101278754,0.0001151322],"domain_scores_gemma":[0.9972825,0.0019521734,0.00021463087,0.00008703015,0.00039595182,0.00006763831],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002436522,0.0010317134,0.00080296415,0.0020025289,0.0005128891,0.0009379833,0.0009843141,0.000661963,0.0011563716],"category_scores_gemma":[0.0036925585,0.00039132542,0.0011750686,0.0017307848,0.0003991735,0.0005623448,0.00047142367,0.0011958332,0.0002981332],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027432814,0.0003886645,0.054260723,0.00003520839,0.000120765115,0.00023152422,0.00007717492,0.88077724,0.00081506703,0.0010562473,0.0035043126,0.05845874],"study_design_scores_gemma":[0.0000063374405,0.000018849469,0.0035037263,0.000004158388,0.000007854099,0.000011131172,0.000011340457,0.99596334,0.000089190245,0.00028746625,0.00009176117,0.0000047520675],"about_ca_topic_score_codex":0.028765881,"about_ca_topic_score_gemma":0.015189484,"teacher_disagreement_score":0.028765881,"about_ca_system_score_codex":0.00093947205,"about_ca_system_score_gemma":0.0014141263,"threshold_uncertainty_score":0.057196915},"labels":[],"label_agreement":null},{"id":"W3134564537","doi":"10.3846/jcem.2021.14344","title":"ENHANCEMENT OF BID DECISION-MAKING IN CONSTRUCTION PROJECTS: A RELIABILITY ANALYSIS APPROACH","year":2021,"lang":"en","type":"article","venue":"Journal of Civil Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Schedule; Computer science; Reliability (semiconductor); Operations research; Reputation; Cost overrun; Process (computing); Risk analysis (engineering); Cost contingency; Business; Engineering; Construction industry","score_opus":0.021615320546065377,"score_gpt":0.29378138020756817,"score_spread":0.2721660596615028,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134564537","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024446113,0.0001916024,0.9719344,0.00023438105,0.000015441188,0.00012982705,0.000034120214,0.00009217282,0.0029220255],"genre_scores_gemma":[0.6507687,0.0003121539,0.34757164,0.00003929275,0.00006474228,0.00022516433,0.00008134196,0.000060812486,0.0008761417],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9847686,0.0116699375,0.0004977015,0.00057984295,0.00203852,0.0004452601],"domain_scores_gemma":[0.95679027,0.03389814,0.0029162925,0.0015068242,0.0044692587,0.0004192268],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015876131,0.001023328,0.0011880542,0.0032855866,0.00073911005,0.0025676505,0.0015480828,0.0009829997,0.0019743924],"category_scores_gemma":[0.044419833,0.0009983092,0.0012578759,0.0020747741,0.0012131296,0.0031625195,0.0017412854,0.0017514045,0.00029436324],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002803861,0.00031560846,0.012712116,0.0004301903,0.00025132476,0.00027857555,0.0019208885,0.67679673,0.002639968,0.10191004,0.0012591933,0.201205],"study_design_scores_gemma":[0.000011689855,0.000105955514,0.0016016744,0.000041983643,0.000035908455,0.000065692664,0.00024860408,0.97216266,0.0006070334,0.024311822,0.00077540195,0.000031623138],"about_ca_topic_score_codex":0.0038043407,"about_ca_topic_score_gemma":0.0033385584,"teacher_disagreement_score":0.015876131,"about_ca_system_score_codex":0.001994292,"about_ca_system_score_gemma":0.0028704174,"threshold_uncertainty_score":0.08396202},"labels":[],"label_agreement":null},{"id":"W3138122610","doi":"10.1139/cjce-2020-0456","title":"A dynamic modelling of labor productivity impacts arising from change orders in road projects","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Overtime; Change order; Order (exchange); Operations management; Economics; Labour economics; Economic growth; Project management","score_opus":0.0711521981413112,"score_gpt":0.2794826404979926,"score_spread":0.2083304423566814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3138122610","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84460664,0.00028723234,0.13282914,0.000764091,0.000057829202,0.0001598059,0.0007851967,0.00015398696,0.020356046],"genre_scores_gemma":[0.993469,0.00010798358,0.0030141615,0.000014869657,0.0000063153802,0.00006250462,0.0001016652,0.000010747262,0.0032128233],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99955624,0.00015576504,0.000022364644,0.00008530231,0.00005797225,0.00012219272],"domain_scores_gemma":[0.998779,0.0007237659,0.00020359663,0.00004339877,0.0001651281,0.00008504234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008252583,0.00060153,0.00047408132,0.0006477035,0.00051878416,0.0014777243,0.0009564223,0.001462454,0.0027748882],"category_scores_gemma":[0.0028722482,0.00048066938,0.00072565547,0.0006264091,0.0006229399,0.00083573436,0.0007877072,0.0009742935,0.00019716434],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015682765,0.000023501658,0.0015204761,0.000009754064,0.0000061120927,0.00004702755,0.00003073888,0.9956399,0.00024650805,0.0013172359,0.00008460012,0.0010584863],"study_design_scores_gemma":[0.0000029793698,0.000014687044,0.0005874952,0.0000027448996,0.0000036067672,0.000004998359,0.00003343452,0.9987373,0.000058435096,0.00041371005,0.00013675836,0.000003916214],"about_ca_topic_score_codex":0.06787396,"about_ca_topic_score_gemma":0.028300637,"teacher_disagreement_score":0.93212605,"about_ca_system_score_codex":0.0018137178,"about_ca_system_score_gemma":0.0020324585,"threshold_uncertainty_score":0.13495779},"labels":[],"label_agreement":null},{"id":"W3142575080","doi":"10.5555/1162708.3260030","title":"Session details: Construction engineering and project management: construction engineering I","year":2005,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Session (web analytics); Computer science; Project management; Engineering management; Construction engineering; Software engineering; Engineering; Systems engineering; World Wide Web","score_opus":0.05863036733649369,"score_gpt":0.32780511241589666,"score_spread":0.269174745079403,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3142575080","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011328684,0.004844229,0.0080777975,0.030660653,0.09712521,0.0025425882,0.009549344,0.0037909176,0.8320806],"genre_scores_gemma":[0.017656261,0.0019142557,0.0008904416,0.001269065,0.007593476,0.00077940495,0.0031889933,0.00067896576,0.96602905],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993376,0.000119887896,0.000031556523,0.00012606331,0.00017126324,0.00021359105],"domain_scores_gemma":[0.9967734,0.00033514545,0.000079713034,0.00016443229,0.00079147227,0.0018557706],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0020689513,0.0026437405,0.002388753,0.001057816,0.0038364031,0.0055223946,0.0015107595,0.004480889,0.7366441],"category_scores_gemma":[0.0021475386,0.00056315126,0.0014264304,0.0015303436,0.0004505277,0.002348319,0.00417825,0.003207384,0.42755872],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005955124,0.00033164863,0.00042861662,0.0002056279,0.000015697451,0.000065411594,0.00014888782,0.0004963744,0.0012992353,0.0009024008,0.96749943,0.028011164],"study_design_scores_gemma":[0.00015778116,0.00024292561,0.0026491422,0.00016154071,0.000015655009,0.000046338013,0.00031195476,0.0010176655,0.0008252876,0.0008585669,0.9936825,0.00003061856],"about_ca_topic_score_codex":0.0028214802,"about_ca_topic_score_gemma":0.00651369,"teacher_disagreement_score":0.7366441,"about_ca_system_score_codex":0.0014579784,"about_ca_system_score_gemma":0.0025058542,"threshold_uncertainty_score":0.37564522},"labels":[],"label_agreement":null},{"id":"W3145228674","doi":"10.1016/j.ijproman.2021.02.007","title":"Collaboration and opportunism in megaproject alliance contracts: The interplay between governance, trust and culture","year":2021,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":126,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Cooperative Research Centres, Australian Government Department of Industry; Australian Government","keywords":"Opportunism; Megaproject; Alliance; Corporate governance; Business; Order (exchange); Industrial organization; Public relations; Knowledge management; Management; Economics; Political science; Market economy; Finance; Computer science","score_opus":0.049181778980934954,"score_gpt":0.4002019048462584,"score_spread":0.35102012586532344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3145228674","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94273376,0.0005389183,0.013307709,0.0020390775,0.000020326888,0.00007490145,0.000020220548,0.000014640587,0.04125049],"genre_scores_gemma":[0.9989126,0.00006210437,0.0005577562,0.000020656858,0.000002389983,0.000013603311,0.0000029449766,0.0000022149604,0.00042570598],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9814596,0.014202999,0.0006568762,0.00066549715,0.0016129777,0.0014021334],"domain_scores_gemma":[0.953741,0.028457047,0.009546,0.0018371805,0.002208402,0.0042102677],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012260132,0.00017831771,0.0002786275,0.001154318,0.0053118677,0.007199154,0.000811729,0.0012565838,0.002613402],"category_scores_gemma":[0.028994305,0.00042133406,0.0002235862,0.0012202308,0.007706619,0.005164462,0.0065889694,0.0013725313,0.00016709878],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041958696,0.00046800406,0.21370652,0.00046215483,0.00015149845,0.003897435,0.42174777,0.005332405,0.0026685505,0.25942037,0.001698905,0.09002683],"study_design_scores_gemma":[0.0000888218,0.00066538155,0.20155247,0.0007381342,0.00012929474,0.0024660786,0.56281984,0.013649233,0.0019585416,0.16835962,0.047366794,0.0002057802],"about_ca_topic_score_codex":0.0041576037,"about_ca_topic_score_gemma":0.00701166,"teacher_disagreement_score":0.012260132,"about_ca_system_score_codex":0.003983274,"about_ca_system_score_gemma":0.0063898917,"threshold_uncertainty_score":0.06483853},"labels":[],"label_agreement":null},{"id":"W3148818745","doi":"","title":"Lessons Learned from Canadian Pre-Project Design Review - Quality assurance of design","year":2013,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Canadian Nuclear Safety Commission","funders":"","keywords":"Quality assurance; Engineering management; Computer science; Engineering; Operations management","score_opus":0.44235229380761326,"score_gpt":0.4562601943139134,"score_spread":0.013907900506300142,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3148818745","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0963213,0.05109985,0.018901078,0.6852368,0.004922408,0.0009057356,0.0009377677,0.0006054227,0.14106956],"genre_scores_gemma":[0.84637344,0.021814499,0.036259033,0.055017885,0.00096203043,0.00045152628,0.0008004652,0.00044580942,0.03787533],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.8778747,0.044224292,0.00776462,0.005502077,0.052582595,0.01205159],"domain_scores_gemma":[0.59614885,0.14233565,0.011011993,0.0105516175,0.21834147,0.021610504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.13551575,0.0008468788,0.0012232134,0.007457565,0.01510253,0.0178504,0.006549443,0.005251994,0.005534217],"category_scores_gemma":[0.19123851,0.0010107096,0.00092389464,0.009847932,0.0091928905,0.005300049,0.0063714324,0.008704905,0.0006409404],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":true,"study_design_scores_codex":[0.00036781243,0.00045149808,0.029104525,0.0057975026,0.0002603778,0.0019678748,0.08361285,0.0041563874,0.0025290723,0.072768845,0.2617715,0.5372117],"study_design_scores_gemma":[0.00013598154,0.00035516554,0.08291051,0.007430468,0.00022095842,0.000676366,0.06260145,0.0016460579,0.0031048707,0.018486515,0.8219753,0.00045643406],"about_ca_topic_score_codex":0.9360751,"about_ca_topic_score_gemma":0.97721535,"teacher_disagreement_score":0.8202777,"about_ca_system_score_codex":0.1797223,"about_ca_system_score_gemma":0.39106598,"threshold_uncertainty_score":0.9514059},"labels":[],"label_agreement":null},{"id":"W3149808423","doi":"","title":"A Process Management Approach to Fund Safety Projects in Alberta","year":2005,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Process (computing); Process management; Operations management; Finance; Environmental planning; Computer science; Engineering; Geography","score_opus":0.10844470656560051,"score_gpt":0.3749865734482783,"score_spread":0.2665418668826778,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3149808423","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6049869,0.001422081,0.13388683,0.012330316,0.00022444632,0.0017255989,0.00029892844,0.00059090974,0.24453393],"genre_scores_gemma":[0.9297434,0.0004503622,0.03972784,0.00021893217,0.00002858908,0.00015608447,0.00010464655,0.000023190949,0.029547073],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9965243,0.000916044,0.000117775635,0.00022675212,0.0012657052,0.0009493654],"domain_scores_gemma":[0.9976162,0.0006505289,0.0001563787,0.00011549306,0.00091238326,0.00054904266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046812515,0.00035919587,0.0001545065,0.0036577708,0.0052638827,0.0062428326,0.0019819424,0.001493236,0.0036348728],"category_scores_gemma":[0.0061745984,0.00028150028,0.00034296847,0.0031046397,0.001952504,0.0012558606,0.0019668522,0.0011076228,0.00020704398],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004212878,0.0005978806,0.03176929,0.00034379622,0.00006197513,0.0013439035,0.008470599,0.14993109,0.0066180453,0.36231145,0.010703343,0.42742726],"study_design_scores_gemma":[0.00058235595,0.0015456481,0.104842804,0.0006110236,0.00033461925,0.0008719984,0.044922687,0.36549905,0.013206855,0.14080083,0.32639876,0.0003834241],"about_ca_topic_score_codex":0.7928101,"about_ca_topic_score_gemma":0.8632634,"teacher_disagreement_score":0.20718992,"about_ca_system_score_codex":0.05415784,"about_ca_system_score_gemma":0.0958015,"threshold_uncertainty_score":0.41682017},"labels":[],"label_agreement":null},{"id":"W3152917775","doi":"10.5267/j.jpm.2021.3.001","title":"Impact of project management certification on project performance","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Certification; Conformity; Project management; Professional certification (computer technology); Psychology; Knowledge management; Medical education; Business; Management; Computer science; Medicine; Social psychology","score_opus":0.14333826271795458,"score_gpt":0.42611742260399316,"score_spread":0.2827791598860386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3152917775","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99206406,0.00009381848,0.00021969927,0.00025724818,0.000008998027,0.000013553745,0.000021215063,0.000010750256,0.007310686],"genre_scores_gemma":[0.99955314,0.000026222775,0.00007189876,0.000009557773,0.000003240952,0.00000208342,0.000012775804,0.000001297606,0.00031966815],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9952656,0.0022946317,0.00015560414,0.00021776857,0.0012337664,0.000832603],"domain_scores_gemma":[0.97025067,0.010972524,0.006464489,0.0009990409,0.0047037895,0.0066094007],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033694713,0.00018638547,0.000146889,0.0005241977,0.00050058967,0.0012692882,0.00024149605,0.00023446756,0.0041677007],"category_scores_gemma":[0.020757802,0.000073618365,0.00015755596,0.0003953652,0.00087482185,0.00034928738,0.0012871369,0.0006600633,0.0003087858],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042826874,0.0011384996,0.86006725,0.00014579034,0.000070865084,0.0005415769,0.0022130604,0.0021963085,0.0029283834,0.0013916859,0.0011512444,0.12772708],"study_design_scores_gemma":[0.000009474853,0.00062830804,0.9945281,0.00004687247,0.000015729986,0.00012665456,0.001974089,0.00068738917,0.0006251221,0.00019642343,0.0011496522,0.000012261032],"about_ca_topic_score_codex":0.0036641576,"about_ca_topic_score_gemma":0.0049491785,"teacher_disagreement_score":0.0041677007,"about_ca_system_score_codex":0.0012766449,"about_ca_system_score_gemma":0.0025783656,"threshold_uncertainty_score":0.017819643},"labels":[],"label_agreement":null},{"id":"W3155095572","doi":"10.3390/jrfm14040187","title":"Structural Failures Risk Analysis as a Tool Supporting Corporate Responsibility","year":2021,"lang":"en","type":"article","venue":"Journal of risk and financial management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Demolition; Human error; Process (computing); Risk analysis (engineering); Structural failure; Business; Control (management); Point (geometry); Engineering; Operations management; Construction engineering; Computer science; Civil engineering; Structural engineering; Mathematics","score_opus":0.0358754272994897,"score_gpt":0.32433890202837634,"score_spread":0.28846347472888667,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3155095572","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.078769304,0.0019034332,0.8761963,0.0028623815,0.00022170605,0.00068423065,0.0021393562,0.002925845,0.03429747],"genre_scores_gemma":[0.6907752,0.0008669365,0.30218318,0.00014162906,0.0001968751,0.00058694265,0.0011913194,0.00016334989,0.003894521],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99033654,0.004267178,0.0008931487,0.00084095536,0.003266119,0.00039602118],"domain_scores_gemma":[0.95148534,0.034611836,0.005993981,0.0022166884,0.004804692,0.0008874502],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016774876,0.0019481769,0.0013315191,0.018687485,0.0011886802,0.005864624,0.0017237138,0.0015576866,0.007641866],"category_scores_gemma":[0.03919448,0.00050045724,0.0016407297,0.0056884605,0.0018172433,0.005060178,0.0040925955,0.0022413468,0.0011315068],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043343173,0.0006532613,0.07832226,0.0013719061,0.00077449414,0.0011308349,0.0054651126,0.18578777,0.002559481,0.2849116,0.016104259,0.42248565],"study_design_scores_gemma":[0.00007429979,0.00052094256,0.032824147,0.0010836418,0.00032536886,0.00079158647,0.007098382,0.5756713,0.003918273,0.33684868,0.040560506,0.00028290413],"about_ca_topic_score_codex":0.0031944788,"about_ca_topic_score_gemma":0.0016426407,"teacher_disagreement_score":0.018687485,"about_ca_system_score_codex":0.0018505774,"about_ca_system_score_gemma":0.0030176367,"threshold_uncertainty_score":0.08871508},"labels":[],"label_agreement":null},{"id":"W3156546971","doi":"10.5267/j.jpm.2021.2.003","title":"Modeling projects interdependencies to measure their synergic impacts on a project portfolio","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Interdependence; Portfolio; Project portfolio management; Measure (data warehouse); Selection (genetic algorithm); Computer science; Process (computing); Set (abstract data type); Application portfolio management; Operations research; Management science; Project management; Risk analysis (engineering); Systems engineering; Business; Engineering; Data mining; Machine learning","score_opus":0.15113782510614707,"score_gpt":0.3755062618083261,"score_spread":0.224368436702179,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3156546971","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15078,0.00021093659,0.84266216,0.00014712286,0.000014953115,0.0002244599,0.00021277778,0.00015814685,0.0055895513],"genre_scores_gemma":[0.8347357,0.00034476825,0.16121732,0.000025135234,0.000010406533,0.0004979001,0.00026648305,0.000031343865,0.002870901],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99867517,0.0006394766,0.000059132806,0.00019150665,0.00030220364,0.0001325272],"domain_scores_gemma":[0.99822813,0.0012691729,0.00023874755,0.00007410309,0.00014224651,0.000047743953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002196672,0.001101097,0.000691908,0.0018206752,0.0003071428,0.0012957896,0.00064628484,0.00078758114,0.002146711],"category_scores_gemma":[0.0041261585,0.00042832378,0.0008474354,0.0021965485,0.00036795312,0.0011133564,0.0010103653,0.0007848839,0.0002147251],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022239077,0.000039643855,0.0020438891,0.000039749175,0.000025591946,0.000033721888,0.000025184201,0.9819589,0.0008486539,0.003030624,0.00010570968,0.011826021],"study_design_scores_gemma":[0.000004141774,0.00004547541,0.00061747077,0.000005169797,0.0000125286815,0.000014485082,0.000018786357,0.99662966,0.0003935447,0.0020258497,0.00022840222,0.0000044342423],"about_ca_topic_score_codex":0.0043321108,"about_ca_topic_score_gemma":0.0036757381,"teacher_disagreement_score":0.0043321108,"about_ca_system_score_codex":0.00092329003,"about_ca_system_score_gemma":0.0015993507,"threshold_uncertainty_score":0.011617243},"labels":[],"label_agreement":null},{"id":"W3156854904","doi":"10.5267/j.jpm.2021.4.001","title":"Critical success factors for human resource management of construction project","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scope (computer science); Critical success factor; Process (computing); Knowledge management; Computer science; Process management; Human resource management; Human resources; Project management; Management science; Order (exchange); Resource (disambiguation); Risk analysis (engineering); Business; Systems engineering; Engineering; Management","score_opus":0.12934280134026777,"score_gpt":0.4364547075706827,"score_spread":0.30711190623041495,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3156854904","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9274228,0.0015873581,0.025025701,0.0014444247,0.00008790238,0.00065014494,0.0002729447,0.000071041126,0.043437727],"genre_scores_gemma":[0.9957268,0.0001629764,0.0031442952,0.00001561347,0.000014749908,0.00010470454,0.00004253724,0.000006943086,0.00078138936],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99594706,0.0013022328,0.00021894841,0.00016374617,0.0019008269,0.00046723516],"domain_scores_gemma":[0.9795284,0.010260123,0.003436114,0.00037080527,0.0040499754,0.0023545239],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030040785,0.000597186,0.00026093595,0.0047357576,0.0014370224,0.0026404962,0.00031250616,0.0004350749,0.0051447484],"category_scores_gemma":[0.020572538,0.00021931468,0.00045298034,0.0021417923,0.0012258155,0.001273654,0.0010348245,0.0007573727,0.00027290866],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00064458215,0.0007142526,0.5762109,0.00086486165,0.00035801448,0.0008128421,0.0093056485,0.01563596,0.0035010919,0.059282847,0.008212273,0.32445666],"study_design_scores_gemma":[0.000106779094,0.0016621478,0.8428914,0.0011797174,0.00025739343,0.00074511586,0.021135533,0.05233399,0.0038733005,0.046260647,0.029308172,0.00024580266],"about_ca_topic_score_codex":0.005716516,"about_ca_topic_score_gemma":0.005944841,"teacher_disagreement_score":0.005716516,"about_ca_system_score_codex":0.0029557857,"about_ca_system_score_gemma":0.0045082024,"threshold_uncertainty_score":0.02144581},"labels":[],"label_agreement":null},{"id":"W3161181471","doi":"10.1108/ci-03-2020-0045","title":"Hybrid fuzzy Monte Carlo agent-based modeling of workforce motivation and performance in construction","year":2021,"lang":"en","type":"article","venue":"Construction Innovation","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Crew; Parametric statistics; Context (archaeology); Computer science; Monte Carlo method; Fuzzy logic; Process (computing); Industrial engineering; Operations research; Engineering; Artificial intelligence","score_opus":0.09525577840667368,"score_gpt":0.31575407628689733,"score_spread":0.22049829788022365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3161181471","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1751615,0.00025658245,0.8033221,0.00042097276,0.0000572038,0.00023372572,0.00025595413,0.00016670268,0.020125192],"genre_scores_gemma":[0.95185816,0.00014803429,0.042877752,0.000051287414,0.000014421841,0.00031671068,0.000087516244,0.000018274362,0.0046277395],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994542,0.00028727742,0.00001842046,0.00007388188,0.000104063045,0.000062173734],"domain_scores_gemma":[0.99872106,0.0008648564,0.00015369969,0.00004860743,0.00015122359,0.000060501177],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012199618,0.0004981295,0.00053096405,0.000674852,0.0004869407,0.0012569609,0.0012484934,0.0012918931,0.0026004852],"category_scores_gemma":[0.0028828213,0.00033627776,0.0007078643,0.000566218,0.00071606215,0.00064186647,0.0007680785,0.00067647046,0.00018180841],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008323528,0.000016157031,0.0004601407,0.000008213058,0.000008712824,0.000017679404,0.000022091142,0.9930627,0.0001258967,0.0049553667,0.00004527982,0.0012694881],"study_design_scores_gemma":[0.000002486446,0.000009058651,0.00012407576,0.0000032493206,0.0000025288605,0.0000034901102,0.000010160952,0.99823475,0.000041555857,0.001426264,0.0001392363,0.0000031767452],"about_ca_topic_score_codex":0.020798443,"about_ca_topic_score_gemma":0.010994422,"teacher_disagreement_score":0.020798443,"about_ca_system_score_codex":0.0014580258,"about_ca_system_score_gemma":0.0015266271,"threshold_uncertainty_score":0.041354775},"labels":[],"label_agreement":null},{"id":"W3161432176","doi":"10.21307/connections-2019.016","title":"Communication networks of an integrated project delivery team for construction: relationships between formal and informal communication networks","year":2020,"lang":"en","type":"article","venue":"Connections","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Integrated project delivery; Knowledge management; Computer science; Business; Process management; Engineering; Systems engineering; Project management","score_opus":0.13473200451784806,"score_gpt":0.34346396332031026,"score_spread":0.2087319588024622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3161432176","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9782402,0.000054643464,0.016456708,0.00017550564,0.000005629312,0.00005262679,0.00004970735,0.000017478731,0.0049474733],"genre_scores_gemma":[0.998514,0.00001937388,0.0011238103,0.0000040587474,0.0000021947,0.000025566229,0.000021219561,0.0000018000865,0.0002879412],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9970981,0.0019977135,0.000093382725,0.00028225104,0.0003007895,0.00022765886],"domain_scores_gemma":[0.97899264,0.014499803,0.0033649933,0.0006716512,0.001380409,0.0010905401],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034616073,0.00031677075,0.00022270622,0.0014896202,0.00082648796,0.002672368,0.00071081734,0.0006403389,0.0027345638],"category_scores_gemma":[0.024779001,0.00020232977,0.00022219148,0.0011199617,0.0010322925,0.002975474,0.0018943073,0.00052657945,0.00019736485],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007461924,0.0009034096,0.60759485,0.00026158194,0.00024006626,0.0008652372,0.01985331,0.1690718,0.0035582893,0.121336736,0.0010717006,0.07449691],"study_design_scores_gemma":[0.00007454476,0.00068031583,0.2765377,0.00017972305,0.00017434746,0.00044009901,0.028897619,0.62220556,0.0014370489,0.06320038,0.006085211,0.00008744388],"about_ca_topic_score_codex":0.0040995204,"about_ca_topic_score_gemma":0.0034589318,"teacher_disagreement_score":0.0040995204,"about_ca_system_score_codex":0.0023007176,"about_ca_system_score_gemma":0.0010957463,"threshold_uncertainty_score":0.01830697},"labels":[],"label_agreement":null},{"id":"W3162582394","doi":"10.1561/112.00000536","title":"A Theoretical Modeling Framework to Support Investment Decisions in Green and Grey Infrastructure under Risk and Uncertainty","year":2021,"lang":"en","type":"article","venue":"Journal of Forest Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Investment (military); Green infrastructure; Investment decisions; Economics; Business; Actuarial science; Environmental resource management; Microeconomics; Production (economics); Political science","score_opus":0.042060113264722615,"score_gpt":0.32159316033807406,"score_spread":0.27953304707335147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3162582394","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026364762,0.0003743077,0.93799424,0.0038043016,0.000081672115,0.00012796403,0.00059922173,0.00017649557,0.030476991],"genre_scores_gemma":[0.85752046,0.0012616488,0.12427253,0.0003954081,0.00015524577,0.00075754424,0.00049239374,0.0000889275,0.015055764],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991671,0.00036629656,0.00003496908,0.00013010953,0.00016239437,0.00013922011],"domain_scores_gemma":[0.9973807,0.001762197,0.0003582537,0.00008341122,0.00029411842,0.00012132743],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002149614,0.0011542905,0.0010893974,0.0013355546,0.0008394216,0.0027507374,0.0023507378,0.0032033143,0.008485432],"category_scores_gemma":[0.005147973,0.000745051,0.0013403357,0.0012231785,0.0017004918,0.002491214,0.0014266465,0.0023101324,0.0006821355],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000065534514,0.00002205568,0.00019813345,0.000024124593,0.000008865873,0.000051635503,0.000028593007,0.8592105,0.00015414352,0.13854924,0.00042927344,0.0013167957],"study_design_scores_gemma":[0.000010453744,0.000016733846,0.00007088074,0.000013802035,0.00000806421,0.000015658901,0.000022722097,0.9463065,0.00006970761,0.05244801,0.0010066685,0.000010686207],"about_ca_topic_score_codex":0.01451481,"about_ca_topic_score_gemma":0.009957681,"teacher_disagreement_score":0.01451481,"about_ca_system_score_codex":0.003700744,"about_ca_system_score_gemma":0.00439571,"threshold_uncertainty_score":0.028860629},"labels":[],"label_agreement":null},{"id":"W3163210510","doi":"10.1061/(asce)me.1943-5479.0000914","title":"Causes of Defects Associated with Tolerances in Construction: A Case Study","year":2021,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Context (archaeology); Identification (biology); Empirical research; Damage tolerance; Risk analysis (engineering); Management science; Operations management; Knowledge management; Engineering; Computer science; Business; Geography; Mathematics","score_opus":0.04605219968653328,"score_gpt":0.315142906904161,"score_spread":0.26909070721762773,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3163210510","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98010385,0.00060289656,0.011453165,0.0014833212,0.000036576817,0.0002585546,0.00006382815,0.000030283307,0.0059674946],"genre_scores_gemma":[0.9877132,0.0011650941,0.007074738,0.00026237726,0.000027176386,0.00010370352,0.000037150996,0.000027114307,0.003589475],"study_design_codex":"case_report","study_design_gemma":"observational","domain_scores_codex":[0.9939407,0.002806162,0.000324599,0.00041061913,0.001796389,0.00072149973],"domain_scores_gemma":[0.98402065,0.010236108,0.002449131,0.00075177266,0.0013918987,0.001150448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044503775,0.0007391224,0.00048318467,0.0028792543,0.006427606,0.0023442707,0.0023039607,0.0050595137,0.0022308973],"category_scores_gemma":[0.01344364,0.0007455194,0.0007777676,0.0024093979,0.0033886787,0.0015912789,0.0033114234,0.0023847271,0.00031103307],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002683933,0.0023634182,0.13096102,0.0016218884,0.00011820951,0.43631545,0.29411688,0.011000317,0.0060514086,0.014155877,0.0053976346,0.09762955],"study_design_scores_gemma":[0.000071135444,0.0020032248,0.09274977,0.0016464253,0.00020341792,0.2781117,0.5269351,0.01590676,0.008759069,0.008982529,0.06436986,0.00026094628],"about_ca_topic_score_codex":0.0069047404,"about_ca_topic_score_gemma":0.01865896,"teacher_disagreement_score":0.0069047404,"about_ca_system_score_codex":0.0033744245,"about_ca_system_score_gemma":0.0034930725,"threshold_uncertainty_score":0.024483323},"labels":[],"label_agreement":null},{"id":"W3165729717","doi":"10.5430/jms.v12n1p31","title":"The Influences of Multiple Factors in the Success of Strategic Planning in Project Management","year":2021,"lang":"en","type":"article","venue":"Journal of Management and Strategy","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Strategic planning; Business; Process management; Excellence; Population; Strategic financial management; Knowledge management; Strategic management; Process (computing); Marketing; Computer science; Political science","score_opus":0.1733174241381114,"score_gpt":0.3900921227767561,"score_spread":0.21677469863864468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3165729717","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8926457,0.0049025584,0.02107379,0.0030529422,0.00018378501,0.00048734676,0.00013344135,0.00006540582,0.07745498],"genre_scores_gemma":[0.9960445,0.000516294,0.0025244951,0.000054434684,0.000026910733,0.00003995476,0.000015070782,0.000013611279,0.00076462945],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.96914107,0.017306834,0.0022760786,0.0013062917,0.007299556,0.0026701712],"domain_scores_gemma":[0.83077043,0.12614101,0.017516024,0.0028169465,0.013441362,0.009314235],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016391965,0.0005946355,0.0005729508,0.0029566148,0.002167857,0.006997126,0.0006036472,0.0010199244,0.0041216486],"category_scores_gemma":[0.069649026,0.00046810423,0.0006692436,0.0025975804,0.0036090964,0.0034701251,0.0026985956,0.0025630032,0.00051081245],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065668713,0.0007053806,0.7472988,0.0009218666,0.00093634997,0.0017942454,0.018003194,0.00864121,0.0024227365,0.0313283,0.0021273852,0.18516393],"study_design_scores_gemma":[0.00005567947,0.0009560022,0.92922807,0.00085590035,0.0005203419,0.0009751138,0.020794623,0.008345646,0.0021062207,0.024085708,0.011788097,0.00028865266],"about_ca_topic_score_codex":0.0054742517,"about_ca_topic_score_gemma":0.009166032,"teacher_disagreement_score":0.016391965,"about_ca_system_score_codex":0.0035599526,"about_ca_system_score_gemma":0.006228924,"threshold_uncertainty_score":0.08669001},"labels":[],"label_agreement":null},{"id":"W3166412559","doi":"10.1061/(asce)co.1943-7862.0002131","title":"How to Improve Crew Motivation and Performance on Construction Sites","year":2021,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","funders":"","keywords":"Speculation; Crew; Audience measurement; Relevance (law); Engineering; Management; Political science; Media studies; Library science; Sociology; Engineering ethics; Computer science; Aeronautics; Law; Economics","score_opus":0.02559180406241549,"score_gpt":0.25721436780092277,"score_spread":0.2316225637385073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3166412559","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8762155,0.0013158681,0.015252058,0.03275582,0.00067187275,0.00039790117,0.00015110146,0.0006853118,0.07255454],"genre_scores_gemma":[0.97273594,0.00087820366,0.016024087,0.000998006,0.00013399796,0.00017688693,0.000096726864,0.000118914024,0.008837239],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9965329,0.0016444625,0.00007105182,0.0002872313,0.00075628614,0.00070812256],"domain_scores_gemma":[0.9921686,0.0024237344,0.0010067376,0.0004963123,0.0013084882,0.0025961518],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005124055,0.00036769398,0.00035198833,0.0010254146,0.0013484458,0.0039514867,0.000854688,0.0014729915,0.00904345],"category_scores_gemma":[0.01915927,0.00018557117,0.00041485758,0.00087160023,0.001142511,0.0027412209,0.0020581372,0.0010963624,0.0023153962],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034183686,0.005424069,0.047799315,0.0009214903,0.00018320649,0.0001399713,0.0052222614,0.0041044056,0.0051786425,0.011918359,0.05651117,0.8622553],"study_design_scores_gemma":[0.0010199639,0.008527162,0.5616815,0.002937332,0.0005739688,0.0003272775,0.05308705,0.024302028,0.015424138,0.07438183,0.25736436,0.00037337682],"about_ca_topic_score_codex":0.0039624996,"about_ca_topic_score_gemma":0.008888948,"teacher_disagreement_score":0.00904345,"about_ca_system_score_codex":0.0013731073,"about_ca_system_score_gemma":0.005110875,"threshold_uncertainty_score":0.03025335},"labels":[],"label_agreement":null},{"id":"W3167343544","doi":"10.7202/1077434ar","title":"Pour une vision géopolitique de l’identification des risques dans les mégaprojets : le cas de la centrale nucléaire de Jaitapur en Inde","year":2021,"lang":"fr","type":"article","venue":"Management international","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Philosophy","score_opus":0.03715018598963265,"score_gpt":0.3741370162918397,"score_spread":0.33698683030220705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3167343544","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8621334,0.002597325,0.044979278,0.0057281675,0.00010466201,0.00021132594,0.0007284201,0.000100645375,0.083416775],"genre_scores_gemma":[0.97734547,0.00094424543,0.0140368035,0.00011117747,0.000020941849,0.00011169417,0.00014598401,0.000022270531,0.0072612306],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9988257,0.00042933784,0.000047333866,0.00018147471,0.0003151776,0.00020087457],"domain_scores_gemma":[0.9979146,0.00094906753,0.00044528503,0.00015067728,0.0004202304,0.000120053424],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015057592,0.0005245681,0.0004490198,0.0030101473,0.0032074053,0.0057413876,0.0007490345,0.00093937316,0.006416209],"category_scores_gemma":[0.0032112098,0.0003219868,0.00039102745,0.005037086,0.0028530536,0.0028189286,0.0031082265,0.0015544416,0.000413154],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001860721,0.00015173313,0.39818665,0.0010937185,0.00018165725,0.0035874185,0.14252481,0.010339771,0.0058846422,0.23238379,0.0036054302,0.20187421],"study_design_scores_gemma":[0.00001151802,0.00016858528,0.5259611,0.0013329745,0.00011593294,0.0016099818,0.29070818,0.0075746584,0.003758795,0.05807817,0.1105416,0.00013851466],"about_ca_topic_score_codex":0.04313332,"about_ca_topic_score_gemma":0.10208134,"teacher_disagreement_score":0.04313332,"about_ca_system_score_codex":0.0035944462,"about_ca_system_score_gemma":0.0051302346,"threshold_uncertainty_score":0.08576453},"labels":[],"label_agreement":null},{"id":"W3171513113","doi":"10.5267/j.jpm.2021.5.004","title":"Causes of government construction projects’ abandonment","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Abandonment (legal); Government (linguistics); Setback; Politics; Project management; Business; Public administration; Public relations; Political science; Economic growth; Economics; Management","score_opus":0.08659125459836879,"score_gpt":0.35455808397153615,"score_spread":0.26796682937316735,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3171513113","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99057734,0.0014481682,0.0006899102,0.0028997164,0.000020710882,0.000070275,0.00018618225,0.000015667976,0.004092145],"genre_scores_gemma":[0.99817574,0.00079666806,0.00028116853,0.00007302515,0.00000918596,0.00002813878,0.00010734453,0.000006881535,0.0005218883],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99406224,0.0017342331,0.0005206029,0.00039106692,0.0023116108,0.0009802876],"domain_scores_gemma":[0.96443397,0.00893338,0.019269986,0.0011884475,0.0042005847,0.0019734818],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004710576,0.0002882289,0.000406601,0.0023290573,0.001968032,0.0014219425,0.00089777214,0.0006816773,0.0026166479],"category_scores_gemma":[0.023476142,0.0003796892,0.0003922087,0.0044323234,0.0025197996,0.0011827569,0.0026618745,0.0020474663,0.0002243308],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009215878,0.00007464376,0.9112099,0.00032577166,0.000047671154,0.0024634604,0.03378087,0.0011802877,0.0006031238,0.0040808236,0.0029806737,0.04316067],"study_design_scores_gemma":[0.000008440633,0.0000614507,0.9237223,0.00045556368,0.00001981682,0.0012690792,0.054159436,0.0011438386,0.0002434596,0.0019397321,0.016944306,0.00003245035],"about_ca_topic_score_codex":0.04000292,"about_ca_topic_score_gemma":0.042270903,"teacher_disagreement_score":0.04000292,"about_ca_system_score_codex":0.005786673,"about_ca_system_score_gemma":0.0060342313,"threshold_uncertainty_score":0.07954013},"labels":[],"label_agreement":null},{"id":"W3172714892","doi":"10.3390/jrfm14060269","title":"Construction Cash Flow Risk Index","year":2021,"lang":"en","type":"article","venue":"Journal of risk and financial management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"American University of Sharjah","keywords":"Cash flow; Business; Actuarial science; Forecast period; Cash flow forecasting; Risk analysis (engineering); Finance","score_opus":0.019974801934037955,"score_gpt":0.2814477054697721,"score_spread":0.26147290353573416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3172714892","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7010577,0.003202594,0.09507694,0.0014469887,0.0003719642,0.0020962125,0.012681577,0.00086419337,0.1832019],"genre_scores_gemma":[0.969884,0.00083588564,0.016031021,0.00006173522,0.000066257504,0.00063676236,0.0034021556,0.00003806837,0.009044239],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9957625,0.00054847164,0.000388068,0.00024506068,0.0027615165,0.0002944379],"domain_scores_gemma":[0.9897469,0.0027837427,0.002724416,0.00041070717,0.0038008322,0.00053337024],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034065926,0.00069293054,0.00040208446,0.006914052,0.0006665841,0.0022376485,0.00085388945,0.0005365909,0.009942809],"category_scores_gemma":[0.015887802,0.00016168079,0.00060172554,0.0036887869,0.0006061401,0.0015750554,0.0012850876,0.00076654146,0.0015280312],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007464483,0.00038397146,0.35837358,0.0010022926,0.000330559,0.00062736584,0.0032148894,0.049186047,0.0045434595,0.047241382,0.030000886,0.5043491],"study_design_scores_gemma":[0.00009003244,0.0017697694,0.6294588,0.0009536288,0.00036693402,0.0020691173,0.00503952,0.075379714,0.0101886615,0.03933752,0.23472892,0.00061740424],"about_ca_topic_score_codex":0.0027230682,"about_ca_topic_score_gemma":0.002399623,"teacher_disagreement_score":0.009942809,"about_ca_system_score_codex":0.0024507712,"about_ca_system_score_gemma":0.0016809233,"threshold_uncertainty_score":0.033261955},"labels":[],"label_agreement":null},{"id":"W3176066633","doi":"10.3390/su13137380","title":"Factors Influencing Collaborative Innovation Project Performance: The Case of China","year":2021,"lang":"en","type":"article","venue":"Sustainability","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Wilfrid Laurier University","funders":"Innovative Research Group Project of the National Natural Science Foundation of China","keywords":"Structural equation modeling; Knowledge management; Incentive; Business; Knowledge sharing; Distribution (mathematics); Resource (disambiguation); Mechanism (biology); Sustainable development; China; Process management; Computer science; Economics; Political science","score_opus":0.06100908216197208,"score_gpt":0.3850281801936762,"score_spread":0.3240190980317041,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3176066633","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9980641,0.0000612779,0.00032501505,0.00010877311,0.0000012341933,0.000022552727,0.000018023435,0.0000044106537,0.0013946905],"genre_scores_gemma":[0.9991868,0.00009037303,0.00036410472,0.000008577423,0.0000015746043,0.0000140834745,0.000025185598,0.0000017550007,0.00030751267],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.996601,0.0013388986,0.00023314235,0.00024449054,0.00068967015,0.00089278806],"domain_scores_gemma":[0.9935315,0.0028170734,0.0012294916,0.00048635912,0.0010426065,0.00089293066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005422783,0.00042307918,0.00043801696,0.0025835568,0.002589325,0.002186446,0.00084054214,0.00067727076,0.001374849],"category_scores_gemma":[0.008055359,0.00023935434,0.00039259213,0.005204937,0.0015001877,0.0013094723,0.0019380214,0.0005607535,0.0001504348],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017092748,0.00050815544,0.87577415,0.00028030327,0.00009705126,0.005401938,0.026058115,0.00899235,0.0022499976,0.0055096587,0.000660412,0.07429697],"study_design_scores_gemma":[0.000041905987,0.00045948918,0.9296312,0.00011777172,0.00010432066,0.00083978317,0.04198173,0.01765698,0.0018769645,0.0018583066,0.005337007,0.000094572686],"about_ca_topic_score_codex":0.0928424,"about_ca_topic_score_gemma":0.07179708,"teacher_disagreement_score":0.0928424,"about_ca_system_score_codex":0.0064233537,"about_ca_system_score_gemma":0.00952527,"threshold_uncertainty_score":0.18460399},"labels":[],"label_agreement":null},{"id":"W3182703823","doi":"10.1139/cjce-2020-0012","title":"An analysis of quality liability insurance for prefabricated components using evolutionary game theory","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of New Brunswick; University of Alberta","funders":"North China University of Technology","keywords":"Evolutionary game theory; Game theory; Stochastic game; Government (linguistics); Quality (philosophy); Risk analysis (engineering); Liability; Computer science; Corporate governance; Sample (material); Business; Economics; Microeconomics; Finance","score_opus":0.08233965578885973,"score_gpt":0.33946767401601374,"score_spread":0.25712801822715403,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3182703823","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37196583,0.0006365982,0.59249926,0.0011487106,0.00005670551,0.00022424514,0.00010586652,0.00004638376,0.03331632],"genre_scores_gemma":[0.97974634,0.0003272923,0.0155606745,0.000045962097,0.000011755423,0.00007702798,0.000031881318,0.000009037873,0.004189897],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992261,0.00030898256,0.000023176653,0.000090413494,0.00016736948,0.00018386623],"domain_scores_gemma":[0.99874663,0.00077835284,0.00016296541,0.000030691983,0.0001859424,0.000095294876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014467693,0.0005909759,0.0006586052,0.00095142814,0.0006751148,0.0014160116,0.0009988006,0.0011670091,0.003017658],"category_scores_gemma":[0.0037093246,0.00035356297,0.0009968,0.0005869707,0.0010030838,0.0018936167,0.00085362874,0.0011122423,0.000106509484],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000353746,0.00007500324,0.0039151204,0.00007258216,0.000054890348,0.0004402946,0.00019172466,0.80448717,0.0015145646,0.17861262,0.0006644495,0.0099361455],"study_design_scores_gemma":[0.0000073242372,0.000034426543,0.0008810644,0.000010270709,0.000018065804,0.000052915562,0.00009604313,0.97832507,0.00015921678,0.019929586,0.0004749898,0.000011030606],"about_ca_topic_score_codex":0.014463782,"about_ca_topic_score_gemma":0.007232158,"teacher_disagreement_score":0.014463782,"about_ca_system_score_codex":0.0024940523,"about_ca_system_score_gemma":0.0025691115,"threshold_uncertainty_score":0.028759181},"labels":[],"label_agreement":null},{"id":"W3184913985","doi":"10.29173/mocs148","title":"Facilitating Technology Transfer in Offsite Construction Between India and the UK: Drivers and Challenges","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"UK-India Education and Research Initiative","keywords":"Technology transfer; Business; Developing country; Emerging technologies; Quality (philosophy); Engineering; Engineering management; Environmental planning; Economic growth; Computer science; Economics; Geography; International trade","score_opus":0.07087947127230636,"score_gpt":0.28296257544246756,"score_spread":0.21208310417016119,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3184913985","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9796434,0.00025982715,0.00050622836,0.0042217956,0.00002250366,0.00006046324,0.000019379306,0.000009006611,0.015257323],"genre_scores_gemma":[0.9986266,0.00024726306,0.00014001841,0.00017923852,0.000004744298,0.00001412043,0.0000077653,0.0000029149494,0.0007774103],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9895252,0.00420323,0.00039141774,0.00035330091,0.0021144159,0.0034124097],"domain_scores_gemma":[0.9847089,0.0072222035,0.002612438,0.00046576292,0.0018006818,0.0031900078],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0051464154,0.00031599254,0.00027724268,0.0012614568,0.0047666277,0.0069030803,0.0012859495,0.0013909083,0.0033243026],"category_scores_gemma":[0.015345992,0.00034216832,0.00024332678,0.0018599337,0.0037083924,0.0031238354,0.006609608,0.0020561118,0.00033162683],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029481732,0.0010733784,0.3015421,0.0007186913,0.00006024505,0.0068676635,0.50310093,0.0014860475,0.0030381153,0.032739058,0.0076043555,0.14147463],"study_design_scores_gemma":[0.000010233665,0.00016426432,0.09723756,0.00025988396,0.000011812028,0.0005252515,0.8766081,0.00050809584,0.00042920175,0.0018873011,0.022316577,0.00004176496],"about_ca_topic_score_codex":0.03318744,"about_ca_topic_score_gemma":0.036653474,"teacher_disagreement_score":0.03318744,"about_ca_system_score_codex":0.0068957224,"about_ca_system_score_gemma":0.010356562,"threshold_uncertainty_score":0.06598854},"labels":[],"label_agreement":null},{"id":"W3185021300","doi":"10.5465/ambpp.2021.12679abstract","title":"A team emergent state approach towards readiness to change","year":2021,"lang":"en","type":"article","venue":"Academy of Management Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Mediation; Process (computing); Reflexivity; Team effectiveness; Theory of change; Process management; Plan (archaeology); Team building; Psychology; Organizational change; Foundation (evidence); Knowledge management; Political science; Engineering; Public relations; Computer science; Management; Sociology; Engineering management","score_opus":0.16100119095030677,"score_gpt":0.3812212877075197,"score_spread":0.2202200967572129,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3185021300","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22513056,0.00063044555,0.5229398,0.0105849635,0.0003104134,0.001161021,0.0002582433,0.00036412725,0.23862047],"genre_scores_gemma":[0.9482202,0.0002196939,0.045772057,0.00040126717,0.000031504635,0.0006786178,0.000082571394,0.000036339472,0.0045577954],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9938496,0.0037614284,0.00025038037,0.0008684569,0.00081173854,0.00045856842],"domain_scores_gemma":[0.9928525,0.0034871711,0.0009919157,0.0007729735,0.0012527338,0.00064269896],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005532123,0.00045442136,0.0004109359,0.0029228884,0.0015360437,0.00515909,0.0012290118,0.0014144294,0.008460915],"category_scores_gemma":[0.010326252,0.00032286192,0.0012973314,0.0013359931,0.005355132,0.0048902463,0.004891218,0.0025467398,0.0006858707],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007250771,0.00032373212,0.023303894,0.00025844164,0.00011465534,0.00045548083,0.021914613,0.003534607,0.0015607721,0.90480846,0.0012937877,0.04235911],"study_design_scores_gemma":[0.00009620972,0.00087034574,0.035566423,0.00046657296,0.00020542539,0.0010147648,0.03072594,0.048643325,0.0017873336,0.8411433,0.039351165,0.00012908339],"about_ca_topic_score_codex":0.0015847832,"about_ca_topic_score_gemma":0.0013895552,"teacher_disagreement_score":0.008460915,"about_ca_system_score_codex":0.0028110698,"about_ca_system_score_gemma":0.0031578839,"threshold_uncertainty_score":0.02925706},"labels":[],"label_agreement":null},{"id":"W3185524470","doi":"","title":"Litigation management process in construction industry","year":2021,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Negotiation; Process (computing); Plaintiff; Dispute resolution; Business; Order (exchange); Deliverable; Standardization; Procurement; Liability; Construction contract; Contract management; Process management; Computer science; Law; Accounting; Political science; Economics; Finance; Marketing; Management","score_opus":0.09370296979235329,"score_gpt":0.4113768246363119,"score_spread":0.3176738548439586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3185524470","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13116401,0.0030262303,0.52295756,0.020245604,0.00072259,0.008534861,0.00050073065,0.0016486438,0.31119975],"genre_scores_gemma":[0.64749545,0.0013730824,0.23283611,0.0019172691,0.0002946137,0.0023078409,0.00067909266,0.00023696684,0.112859555],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.95686316,0.020265074,0.0024862988,0.0039896052,0.0137672955,0.0026285292],"domain_scores_gemma":[0.9617106,0.019968376,0.0031558706,0.0034132113,0.009723213,0.0020287258],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.031549104,0.0005254218,0.0003498044,0.0037247192,0.011998981,0.009792542,0.0031217781,0.0038757352,0.0118115],"category_scores_gemma":[0.04705667,0.00042092818,0.00074702885,0.0030683677,0.0040818816,0.004770869,0.0069053657,0.0027764537,0.0033641495],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016087227,0.00068961945,0.007559747,0.00051385,0.000034520814,0.0020277512,0.045213327,0.007400735,0.006489317,0.35199672,0.02897092,0.5489427],"study_design_scores_gemma":[0.0001511726,0.0005939231,0.01506227,0.0010191201,0.00006768211,0.0016036176,0.028601874,0.023347763,0.01208953,0.13540527,0.7817381,0.00031961696],"about_ca_topic_score_codex":0.018193329,"about_ca_topic_score_gemma":0.014896802,"teacher_disagreement_score":0.031549104,"about_ca_system_score_codex":0.0126150735,"about_ca_system_score_gemma":0.033408366,"threshold_uncertainty_score":0.16684961},"labels":[],"label_agreement":null},{"id":"W3185736914","doi":"10.1177/87569728211020606","title":"Opening the Black Box of Benefits Management in the Context of Projects","year":2021,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Popularity; Variety (cybernetics); Perspective (graphical); Task (project management); Context (archaeology); Process management; Knowledge management; Management science; Business; Risk analysis (engineering); Computer science; Engineering; Psychology; Social psychology; Systems engineering","score_opus":0.12372105717878518,"score_gpt":0.3679998820618492,"score_spread":0.24427882488306402,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3185736914","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2983682,0.01295471,0.18780558,0.14383878,0.00079571235,0.00041596888,0.00011565031,0.00015501904,0.3555505],"genre_scores_gemma":[0.97853136,0.0018127732,0.01546576,0.0012502661,0.00013461491,0.00011121167,0.00001601759,0.000040154013,0.0026377707],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9720009,0.022014888,0.00042202222,0.0009471574,0.0031045922,0.0015105025],"domain_scores_gemma":[0.97166234,0.019821897,0.002298397,0.0017857658,0.0022816258,0.0021498415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022582576,0.0006101616,0.0006165583,0.0027919647,0.0090750875,0.01811578,0.001480948,0.00396684,0.005820641],"category_scores_gemma":[0.028265405,0.00043352591,0.00044849893,0.0029270547,0.030686324,0.018595634,0.012118,0.00530191,0.00061615184],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006802204,0.00010523209,0.005643896,0.00060723093,0.000023352515,0.0007421722,0.06943701,0.0010978186,0.0010518971,0.8391244,0.0033269145,0.07877209],"study_design_scores_gemma":[0.000017781724,0.00017562839,0.011267183,0.0022934473,0.000029418887,0.00069952727,0.12539053,0.0026371903,0.0009417811,0.7051924,0.15126517,0.00009001423],"about_ca_topic_score_codex":0.002292546,"about_ca_topic_score_gemma":0.0044914857,"teacher_disagreement_score":0.022582576,"about_ca_system_score_codex":0.0069341124,"about_ca_system_score_gemma":0.011042548,"threshold_uncertainty_score":0.11942953},"labels":[],"label_agreement":null},{"id":"W3186283265","doi":"10.5267/j.ac.2021.6.010","title":"A comprehensive study on the quality of sustainability reporting disclosure between Indonesia and other countries","year":2021,"lang":"en","type":"article","venue":"Accounting","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainability; Business; Corporate social responsibility; Accounting; Quality (philosophy); Marketing; Profit (economics); Social responsibility; Service quality; Sustainability reporting; Service (business); Public relations; Economics","score_opus":0.2095253005516022,"score_gpt":0.4507946418400217,"score_spread":0.2412693412884195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3186283265","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99398094,0.0005494243,0.0002077684,0.0003203277,0.000018863599,0.000021438935,0.00020422564,0.0000042332517,0.0046927147],"genre_scores_gemma":[0.9991974,0.00025061908,0.00009892058,0.000042923162,0.0000064079904,0.0000061299434,0.00010112262,0.0000025179197,0.00029402255],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99530834,0.0014715235,0.0008797765,0.00033826067,0.0015831788,0.0004189347],"domain_scores_gemma":[0.97045743,0.010350616,0.013942676,0.0011882611,0.0030834258,0.0009775885],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0059898673,0.00013528967,0.00028107682,0.0017562389,0.0006589065,0.0023498782,0.00033022638,0.0003206698,0.0014647291],"category_scores_gemma":[0.01544672,0.00015872926,0.00022804787,0.0040298915,0.00092821725,0.001325078,0.0010382313,0.0007339039,0.00016217766],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006825568,0.00010051322,0.9591974,0.00022258103,0.00003605514,0.00037495844,0.011551704,0.00009844502,0.00041230666,0.00087508815,0.0004559227,0.026606752],"study_design_scores_gemma":[0.0000019090123,0.000060144543,0.9709354,0.00013489796,0.000019139972,0.0005070399,0.023907738,0.00018376872,0.00042011618,0.00010232279,0.0037108373,0.000016613007],"about_ca_topic_score_codex":0.0060251607,"about_ca_topic_score_gemma":0.006893779,"teacher_disagreement_score":0.0060251607,"about_ca_system_score_codex":0.0012924876,"about_ca_system_score_gemma":0.002017528,"threshold_uncertainty_score":0.031677783},"labels":[],"label_agreement":null},{"id":"W3186705174","doi":"10.3390/jrfm14070332","title":"When Wrong Is Right: Leaving Room for Error in Innovation Measurement","year":2021,"lang":"en","type":"article","venue":"Journal of risk and financial management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Performance indicator; Organizational performance; Knowledge management; Business; Process management; Marketing; Computer science","score_opus":0.07982915613212027,"score_gpt":0.324684529873527,"score_spread":0.2448553737414067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3186705174","genre_codex":"methods","genre_gemma":"empirical","domain_codex":"methods","domain_gemma":"methods","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":"methods","domain_consensus":"methods","prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31526062,0.023110878,0.48419067,0.14030775,0.0033552244,0.00094843056,0.00040056105,0.0005955916,0.031830307],"genre_scores_gemma":[0.9123034,0.0030349558,0.07355877,0.008193622,0.0008389024,0.00064354873,0.00011944074,0.00028370623,0.0010235622],"study_design_codex":"qualitative","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.40184507,0.4525289,0.039620128,0.021730272,0.078662574,0.005613032],"domain_scores_gemma":[0.14225957,0.7393954,0.04716781,0.03308719,0.03579559,0.0022943283],"candidate_categories":["metaresearch"],"consensus_categories":["metaresearch"],"category_scores_codex":[0.36137587,0.001134209,0.0024157406,0.00802098,0.0067223147,0.017379556,0.004879155,0.004695461,0.0018593372],"category_scores_gemma":[0.6225227,0.0014087531,0.0015102387,0.007732585,0.03059977,0.02847765,0.013476445,0.0069719884,0.00047571506],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005060903,0.00021469474,0.091415636,0.004684234,0.00043093364,0.0011778133,0.39439678,0.002844066,0.0016545706,0.17747042,0.0086769555,0.31652784],"study_design_scores_gemma":[0.00013167161,0.00053693156,0.042899396,0.017518084,0.0003934154,0.0019039045,0.24196552,0.012738177,0.0052743116,0.58643585,0.08949522,0.0007076315],"about_ca_topic_score_codex":0.0061610597,"about_ca_topic_score_gemma":0.004553078,"teacher_disagreement_score":0.63862413,"about_ca_system_score_codex":0.008449561,"about_ca_system_score_gemma":0.014175384,"threshold_uncertainty_score":0.7875373},"labels":[],"label_agreement":null},{"id":"W3190664688","doi":"10.1139/cjce-2021-0099","title":"Domain-specific risk assessment using integrated simulation: a case study of an onshore wind project","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Risk assessment; Critical path method; Schedule; Risk analysis (engineering); Computer science; Monte Carlo method; Risk management; Engineering; Operations research; Systems engineering; Mathematics; Business; Statistics","score_opus":0.09099964706789299,"score_gpt":0.3571964455302047,"score_spread":0.2661967984623117,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3190664688","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9612197,0.00015193487,0.029002799,0.00028106317,0.000014944865,0.00022749211,0.00023595979,0.00011060668,0.008755498],"genre_scores_gemma":[0.9786653,0.0001657415,0.019013755,0.000022177193,0.000004917272,0.00009243009,0.00013103808,0.000021319971,0.001883358],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988224,0.0006471032,0.00004758754,0.000098168304,0.0002327868,0.00015187447],"domain_scores_gemma":[0.99710613,0.001891535,0.00021368476,0.00019051917,0.00039049855,0.0002075798],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022591313,0.00094477384,0.000610872,0.0011553603,0.0010441262,0.0014870111,0.0011278667,0.0017702745,0.0018596487],"category_scores_gemma":[0.0029933196,0.00040268712,0.00071174395,0.0013754658,0.0009177222,0.0007337592,0.0010611796,0.0011921528,0.00023130237],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002069784,0.00063867867,0.012496103,0.000091555055,0.00005047286,0.0023538647,0.00044344124,0.964213,0.0014935146,0.003805984,0.0007473198,0.013459109],"study_design_scores_gemma":[0.0000713819,0.00040968106,0.0037690494,0.000032814092,0.000041202155,0.0003087219,0.0010114111,0.9887034,0.0017812483,0.00238877,0.0014437231,0.000038465296],"about_ca_topic_score_codex":0.02266246,"about_ca_topic_score_gemma":0.026705768,"teacher_disagreement_score":0.02266246,"about_ca_system_score_codex":0.0016728155,"about_ca_system_score_gemma":0.0017116161,"threshold_uncertainty_score":0.04506111},"labels":[],"label_agreement":null},{"id":"W3192828292","doi":"10.1080/09537287.2021.1909168","title":"The impact of project portfolio management practices on the relationship between organizational ambidexterity and project performance success","year":2021,"lang":"en","type":"article","venue":"Production Planning & Control","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":42,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Stantec (Canada)","funders":"","keywords":"Ambidexterity; Business; Scope (computer science); Portfolio; Knowledge management; Project portfolio management; Project management; Process management; Management; Computer science; Economics; Finance","score_opus":0.16632570964103321,"score_gpt":0.422666684751808,"score_spread":0.2563409751107748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3192828292","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99737895,0.00007486681,0.0002613216,0.00006422346,0.0000017861792,0.000008194849,0.000021296912,0.0000031629863,0.002186225],"genre_scores_gemma":[0.999684,0.000040043695,0.00011457835,0.0000049909304,0.000002260382,0.000005157504,0.000025499168,0.0000012430662,0.00012225368],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99366564,0.0028713534,0.0006637013,0.00039365143,0.0016703991,0.00073516177],"domain_scores_gemma":[0.9465023,0.024496011,0.018483296,0.0021993637,0.0036670833,0.0046519632],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006806203,0.00020595909,0.0001579484,0.0017263885,0.00050458213,0.002222527,0.0003048844,0.00024678212,0.0016761187],"category_scores_gemma":[0.028799875,0.00015103676,0.00020196877,0.0017376051,0.0011872782,0.0011375686,0.0023872934,0.0006031377,0.00026228782],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060780632,0.0001276643,0.9791632,0.000018944162,0.000054646276,0.00006898536,0.00082361297,0.0005162332,0.00032492646,0.0003076864,0.00008472891,0.0184485],"study_design_scores_gemma":[0.0000019608262,0.00017722143,0.99707425,0.000016407152,0.000008765457,0.000046851022,0.0016619216,0.00037523377,0.00017005843,0.00014992498,0.00031158252,0.0000058354126],"about_ca_topic_score_codex":0.0012024203,"about_ca_topic_score_gemma":0.0020801825,"teacher_disagreement_score":0.006806203,"about_ca_system_score_codex":0.0008622471,"about_ca_system_score_gemma":0.0010971052,"threshold_uncertainty_score":0.035995126},"labels":[],"label_agreement":null},{"id":"W3193817600","doi":"10.14455/isec.2021.8(1).cpm-04","title":"OPTIMIZING PRODUCTIVITY RATE TO MINIMIZE OVERDRAFT INTEREST PAYMENT IN INFRASTRUCTURE CONSTRUCTION PROJECTS","year":2021,"lang":"en","type":"article","venue":"Proceedings of International Structural Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cash flow; Overdraft; Payment; Profit (economics); Business; Cash; Investment (military); Productivity; Finance; Computer science; Economics; Microeconomics","score_opus":0.02567016380655884,"score_gpt":0.28109321126497255,"score_spread":0.2554230474584137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3193817600","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5481336,0.0004771884,0.4393962,0.00037035602,0.000041596053,0.00031046977,0.00016676038,0.00026644472,0.010837269],"genre_scores_gemma":[0.98342115,0.00014647887,0.015128859,0.000011378192,0.000003053245,0.00006893267,0.000036691446,0.000018751134,0.0011647653],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99853015,0.0006618477,0.000053127194,0.00016019802,0.0002289397,0.00036585474],"domain_scores_gemma":[0.99883455,0.00057625247,0.0002588396,0.00005624185,0.00015697094,0.00011714376],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026773126,0.0006734148,0.0008342711,0.00092722283,0.00049258413,0.002038624,0.0010137116,0.0011353478,0.0014489092],"category_scores_gemma":[0.004058042,0.0006791293,0.000579345,0.00084884727,0.00042179154,0.0011345228,0.00084561156,0.00071397907,0.00024405145],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005015768,0.000048801554,0.001043261,0.000024442455,0.000008380752,0.000034686105,0.000024072782,0.9910144,0.00097620604,0.0011018853,0.00011007085,0.005563613],"study_design_scores_gemma":[0.000010470559,0.00010986732,0.00070551585,0.000007612213,0.000011704748,0.00001767919,0.000048164195,0.99744797,0.00071531103,0.0007095309,0.00020768383,0.000008529885],"about_ca_topic_score_codex":0.009216892,"about_ca_topic_score_gemma":0.008352977,"teacher_disagreement_score":0.009216892,"about_ca_system_score_codex":0.0018289979,"about_ca_system_score_gemma":0.0030476362,"threshold_uncertainty_score":0.01832652},"labels":[],"label_agreement":null},{"id":"W3195107606","doi":"10.29007/g6d8","title":"Demand of 21st Century Skills in the Construction Workforce","year":2021,"lang":"en","type":"article","venue":"EPiC series in built environment","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"SAIT Polytechnic","funders":"","keywords":"Soft skills; Intrapersonal communication; Workforce; Flexibility (engineering); Interpersonal communication; Social skills; People skills; Business; Knowledge management; Skills management; Marketing; Psychology; Computer science; Management; Economics","score_opus":0.034256241721995574,"score_gpt":0.30194492995470057,"score_spread":0.267688688232705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3195107606","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99233925,0.00012298203,0.00010341293,0.00057634915,0.000023472046,0.000008784005,0.00024008733,0.0000059843587,0.0065796133],"genre_scores_gemma":[0.9934936,0.00023355125,0.0001698096,0.0001546081,0.000039132305,0.000017380959,0.00047217179,0.0000067641354,0.005412968],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99894756,0.00010202677,0.000056969133,0.00007765718,0.0005212911,0.00029453216],"domain_scores_gemma":[0.99562967,0.001011826,0.0011579253,0.00012852617,0.0010201435,0.0010519513],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063837384,0.00013690534,0.00011955753,0.0012742293,0.0006118299,0.0009708386,0.0002956827,0.0004095286,0.009158845],"category_scores_gemma":[0.0037915008,0.00011446504,0.00013418963,0.0011188602,0.00029146593,0.0005292794,0.00096171984,0.00054351136,0.0014862219],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001534143,0.00025945398,0.897497,0.00024117786,0.00002035405,0.0005570814,0.012165601,0.00044359267,0.006307186,0.0013854619,0.006793158,0.07417662],"study_design_scores_gemma":[0.0000039256533,0.0000840649,0.97345114,0.000048112306,0.0000022491288,0.00013982484,0.014585864,0.00029738492,0.00023592912,0.00012551114,0.011016347,0.000009716992],"about_ca_topic_score_codex":0.007156064,"about_ca_topic_score_gemma":0.017913183,"teacher_disagreement_score":0.009158845,"about_ca_system_score_codex":0.00084044517,"about_ca_system_score_gemma":0.0015971586,"threshold_uncertainty_score":0.03063941},"labels":[],"label_agreement":null},{"id":"W3196606717","doi":"10.3390/en14175421","title":"Construction Time Estimation Function for Canadian Utility Scale Power Plants","year":2021,"lang":"en","type":"article","venue":"Energies","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University","funders":"","keywords":"Renewable energy; Estimation; Hydroelectricity; Function (biology); Scale (ratio); Nameplate capacity; Power station; Wind power; Solar power; Engineering; Environmental economics; Environmental resource management; Civil engineering; Power (physics); Electricity generation; Environmental science; Systems engineering; Geography; Economics; Electrical engineering","score_opus":0.0397495276972633,"score_gpt":0.305353325602522,"score_spread":0.2656037979052587,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3196606717","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8504066,0.00070282695,0.1149726,0.0006427956,0.000038327198,0.0003906676,0.013310501,0.0010222804,0.018513484],"genre_scores_gemma":[0.9421812,0.00033421413,0.036286492,0.00004383747,0.00000777897,0.00019522296,0.011272163,0.000103186256,0.009575912],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982504,0.00037673136,0.000107743545,0.0003111114,0.00065523345,0.00029884215],"domain_scores_gemma":[0.9905246,0.0047560115,0.00094351737,0.00041914114,0.003168543,0.00018819737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0050854217,0.0005999915,0.00041550113,0.0025341264,0.0005332713,0.0011290422,0.0009161574,0.00054379663,0.004501097],"category_scores_gemma":[0.020382183,0.00025111207,0.0010840074,0.0034654038,0.00046305094,0.00044078354,0.0004891183,0.0009675541,0.0007364882],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042883918,0.00014184757,0.25633946,0.000232059,0.00014078426,0.00015257784,0.00069789606,0.5455544,0.0024238627,0.014628877,0.01044399,0.16881534],"study_design_scores_gemma":[0.000017593455,0.00010162728,0.27288938,0.00005604957,0.00005973015,0.0000848066,0.00048868055,0.7141746,0.0017770124,0.0013853165,0.008891175,0.000074048956],"about_ca_topic_score_codex":0.86600363,"about_ca_topic_score_gemma":0.8278291,"teacher_disagreement_score":0.13399637,"about_ca_system_score_codex":0.012856749,"about_ca_system_score_gemma":0.011326829,"threshold_uncertainty_score":0.26957095},"labels":[],"label_agreement":null},{"id":"W3196867374","doi":"10.1108/ecam-02-2021-0145","title":"An empirical study on non-physical waste factors in the construction industry","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ranking (information retrieval); Sample (material); Empirical research; Quality (philosophy); Population; Process management; Index (typography); Operations management; Performance indicator; Engineering; Computer science; Business; Marketing; Statistics; Mathematics","score_opus":0.046256057683937125,"score_gpt":0.35467661561246616,"score_spread":0.308420557928529,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3196867374","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9844284,0.0014812679,0.0021731602,0.00042043926,0.000013354207,0.00021851453,0.00017526883,0.0000054679317,0.011083969],"genre_scores_gemma":[0.99542725,0.001963815,0.0015332125,0.00008459205,0.000008373751,0.00010423374,0.00009013704,0.0000044195044,0.0007838976],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99325716,0.00317234,0.0006770669,0.0003638273,0.001959814,0.000569817],"domain_scores_gemma":[0.9380001,0.044624843,0.008631327,0.001309343,0.0066091013,0.00082524435],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007746357,0.00039932365,0.0004612795,0.004245301,0.0015993919,0.0029710452,0.0005625785,0.00058706297,0.003984086],"category_scores_gemma":[0.02660428,0.00035461818,0.00036205625,0.00830474,0.002604499,0.0027066784,0.001299425,0.0006913949,0.0003263032],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002239574,0.0013369416,0.71162635,0.005277797,0.00012363691,0.002070375,0.12028005,0.0019330232,0.0016696549,0.010928723,0.00138708,0.14314239],"study_design_scores_gemma":[0.000015169829,0.0006097985,0.5039453,0.0031201972,0.00008305134,0.0007957148,0.46368933,0.0013142888,0.001734891,0.0017353303,0.022910275,0.000046639947],"about_ca_topic_score_codex":0.0064755017,"about_ca_topic_score_gemma":0.012578888,"teacher_disagreement_score":0.007746357,"about_ca_system_score_codex":0.0024914392,"about_ca_system_score_gemma":0.005864802,"threshold_uncertainty_score":0.040967107},"labels":[],"label_agreement":null},{"id":"W3197819069","doi":"10.3390/su13179861","title":"Towards a Framework for Promoting Communication during Project Definition","year":2021,"lang":"en","type":"article","venue":"Sustainability","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Knowledge management; Process management; Computer science; Project management; Sustainability; Value (mathematics); Project planning; Project management triangle; Business; Engineering; Systems engineering","score_opus":0.10070879212528709,"score_gpt":0.4145736799880445,"score_spread":0.3138648878627574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3197819069","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016506443,0.0024052868,0.8651386,0.040196344,0.00051668374,0.0029363262,0.00012117984,0.00058863586,0.071590506],"genre_scores_gemma":[0.16891523,0.0015391118,0.8209017,0.0013539653,0.00014357781,0.0037012738,0.00016940107,0.00012620856,0.0031495409],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.8346665,0.13806885,0.00875504,0.0047969176,0.009778253,0.0039344607],"domain_scores_gemma":[0.83422196,0.11001225,0.014877732,0.009617808,0.023517549,0.007752697],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.12572902,0.0025970605,0.0011743506,0.012481368,0.011518026,0.025870586,0.0067388844,0.010074933,0.0031949847],"category_scores_gemma":[0.0878652,0.0022216495,0.002247629,0.00852955,0.0401771,0.026032085,0.01447899,0.009263259,0.0013920107],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000419997,0.00030380453,0.0030461238,0.00090030493,0.000031279884,0.00059388176,0.080553934,0.0031116214,0.0007369585,0.8491864,0.004519331,0.05697429],"study_design_scores_gemma":[0.00012618901,0.00028424445,0.0044021895,0.0054599377,0.0000905015,0.0009342585,0.10125288,0.014074582,0.0013395187,0.6504334,0.22132652,0.00027572404],"about_ca_topic_score_codex":0.016645594,"about_ca_topic_score_gemma":0.0151335,"teacher_disagreement_score":0.12572902,"about_ca_system_score_codex":0.023045305,"about_ca_system_score_gemma":0.04792271,"threshold_uncertainty_score":0.6649266},"labels":[],"label_agreement":null},{"id":"W3198893542","doi":"10.1007/978-981-19-0968-9_3","title":"Construction Innovation in the Province of Quebec: Barriers, Drivers, Enablers and Impact","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Enthusiasm; Operationalization; Productivity; Business; Industrial organization; Investment (military); Marketing; Service (business); Ranking (information retrieval); Knowledge management; Economic growth; Economics; Political science; Computer science","score_opus":0.019617001163028794,"score_gpt":0.2660762476233522,"score_spread":0.2464592464603234,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3198893542","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83756024,0.021050045,0.0020534338,0.012333341,0.00021687188,0.000169503,0.0043547917,0.00013755207,0.12212418],"genre_scores_gemma":[0.94324976,0.0042984234,0.00091484503,0.00029483958,0.000015792775,0.000055471777,0.0008097267,0.000015746364,0.050345436],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9988954,0.00015773551,0.000026029524,0.000084319414,0.000350392,0.0004860032],"domain_scores_gemma":[0.99845695,0.00041466858,0.00015140681,0.0000361575,0.0005829545,0.00035785482],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000784395,0.00034531724,0.0003450964,0.0016222625,0.0037275015,0.0037773133,0.0010538268,0.0007650105,0.0083703585],"category_scores_gemma":[0.001967151,0.00023994844,0.00049411884,0.0049101217,0.0017102316,0.0010591666,0.0013128094,0.0008940128,0.0003620286],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038592418,0.00041292896,0.46902344,0.0011468405,0.00029667595,0.0017046962,0.022919724,0.013100435,0.0021572479,0.08812891,0.05919858,0.34152466],"study_design_scores_gemma":[0.000046860278,0.00012879015,0.81112385,0.0008724835,0.00009925157,0.00021482649,0.026849216,0.0078249285,0.00051772123,0.0027724295,0.14944762,0.00010205022],"about_ca_topic_score_codex":0.9957968,"about_ca_topic_score_gemma":0.998264,"teacher_disagreement_score":0.91742694,"about_ca_system_score_codex":0.082573086,"about_ca_system_score_gemma":0.10181995,"threshold_uncertainty_score":0.5991125},"labels":[],"label_agreement":null},{"id":"W3199543043","doi":"10.5539/jsd.v14n5p99","title":"Influence of Project Team Knowledge Diversity on Implementation of Building Construction Projects. A Case of Kajiado County, Kenya, Africa","year":2021,"lang":"en","type":"article","venue":"Journal of Sustainable Development","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Diversity (politics); Project team; Null hypothesis; Government (linguistics); Knowledge management; Qualitative property; Construction management; Business; Building construction; Engineering; Sociology; Computer science; Civil engineering; Mathematics; Statistics","score_opus":0.052870238447659826,"score_gpt":0.3555032660652995,"score_spread":0.30263302761763966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3199543043","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9975769,0.00007759035,0.000119290155,0.0002300492,0.000002387411,0.00002625147,0.000007971747,0.0000010446181,0.00195862],"genre_scores_gemma":[0.99952734,0.00007382108,0.00011695913,0.00001826562,0.0000011899996,0.000012483303,0.000004337233,5.5563925e-7,0.00024510227],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9939142,0.0036971923,0.00024474907,0.00024993785,0.00070323126,0.0011907353],"domain_scores_gemma":[0.9885063,0.0057495395,0.0028596076,0.00028843855,0.0008960357,0.0016999894],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0042870743,0.00021899455,0.00021211054,0.0013857293,0.004737545,0.0022900205,0.0007020777,0.0006540452,0.0013447329],"category_scores_gemma":[0.009986507,0.00031499303,0.00020855315,0.0011574726,0.0021691776,0.0011091401,0.0030120928,0.0007398637,0.00009034584],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019394574,0.0005913722,0.5674979,0.0005003305,0.00011419382,0.024780752,0.33432218,0.0019276716,0.0029381418,0.0029836637,0.00093709456,0.06321277],"study_design_scores_gemma":[0.0000127638905,0.00038541612,0.47206867,0.0003292322,0.000054318,0.0019597814,0.5174492,0.0008525652,0.000532726,0.00037990804,0.0059388694,0.00003662984],"about_ca_topic_score_codex":0.02502653,"about_ca_topic_score_gemma":0.0514289,"teacher_disagreement_score":0.02502653,"about_ca_system_score_codex":0.0040215706,"about_ca_system_score_gemma":0.0063897497,"threshold_uncertainty_score":0.049761713},"labels":[],"label_agreement":null},{"id":"W3199804614","doi":"10.1139/cjce-2021-0026","title":"Investigating implementation level of phase-based strategies in transportation infrastructure projects","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Outsourcing; Business; Process management; Project management; Quality (philosophy); Transportation infrastructure; Phase (matter); Transport engineering; Engineering management; Engineering; Marketing; Systems engineering","score_opus":0.0959696413871213,"score_gpt":0.34225342503311623,"score_spread":0.24628378364599493,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3199804614","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98717564,0.00036435667,0.0049505504,0.00022423902,0.0000073305573,0.00031945526,0.000059349462,0.0000156215,0.006883477],"genre_scores_gemma":[0.9926802,0.00042137492,0.005798549,0.00004397754,0.0000033318845,0.00021239386,0.00007359705,0.0000043289356,0.0007623785],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99129444,0.0050167046,0.0007764879,0.00041389215,0.0019505915,0.0005479346],"domain_scores_gemma":[0.96509546,0.013282621,0.008757627,0.0010493008,0.010478508,0.001336552],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008963817,0.00024186405,0.00023084895,0.001912856,0.0006472379,0.002343847,0.00064565847,0.00055013585,0.0012940026],"category_scores_gemma":[0.03718244,0.00030601193,0.00028479774,0.0017178996,0.00043448573,0.0017194729,0.0012893822,0.00047035317,0.00018745089],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027984835,0.0016969913,0.5781881,0.0013671262,0.00019034377,0.00022182969,0.03134171,0.002304309,0.008891056,0.0054485574,0.00060317334,0.369467],"study_design_scores_gemma":[0.000051651685,0.00347593,0.9069254,0.00060066936,0.00012854037,0.00033170937,0.06450922,0.0030399447,0.0056037735,0.0018449746,0.013397236,0.00009092443],"about_ca_topic_score_codex":0.0030388462,"about_ca_topic_score_gemma":0.0065695876,"teacher_disagreement_score":0.008963817,"about_ca_system_score_codex":0.0022191838,"about_ca_system_score_gemma":0.0043581943,"threshold_uncertainty_score":0.04740578},"labels":[],"label_agreement":null},{"id":"W3201908396","doi":"10.5267/j.ac.2021.8.001","title":"Applying appropriate models to predict bankruptcy for Vietnamese listed construction companies","year":2021,"lang":"en","type":"article","venue":"Accounting","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bankruptcy; Vietnamese; Business; Capital structure; Actuarial science; Accounting; Business risks; Asset (computer security); Risk management; Finance; Stock (firearms); Bankruptcy prediction; Financial distress; Panel data; Financial system; Economics; Debt; Econometrics; Risk analysis (engineering); Engineering","score_opus":0.12094621382997983,"score_gpt":0.35139346974226904,"score_spread":0.2304472559122892,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3201908396","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9848888,0.00032056434,0.012505648,0.00035183673,0.000034202916,0.00008021985,0.00040499907,0.00008017219,0.0013336826],"genre_scores_gemma":[0.9963676,0.0001561648,0.0027662003,0.000017350816,0.000009377834,0.000032148855,0.00032929124,0.000004903782,0.000316892],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906796,0.0005431104,0.000060912644,0.00012693978,0.00007061241,0.00013051467],"domain_scores_gemma":[0.9948265,0.0039570983,0.00039795536,0.00012881303,0.0004977918,0.00019179289],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035685806,0.0007912796,0.00047658902,0.0017903493,0.000388514,0.001815237,0.0005700127,0.00052851014,0.0010827235],"category_scores_gemma":[0.00829523,0.0003209408,0.0007106608,0.000742678,0.00024637044,0.00074844295,0.00059623475,0.0009011165,0.0001722464],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043549974,0.00061341055,0.23215148,0.00009056011,0.00027536176,0.00032441664,0.00046597727,0.7264313,0.00046353132,0.0022543494,0.0012663598,0.035227764],"study_design_scores_gemma":[0.000011232873,0.00009748884,0.011740552,0.000021474521,0.000029234607,0.000022205228,0.0003104175,0.9866334,0.00015223063,0.0007769791,0.00019501292,0.000009671012],"about_ca_topic_score_codex":0.034117,"about_ca_topic_score_gemma":0.029663282,"teacher_disagreement_score":0.034117,"about_ca_system_score_codex":0.0015818403,"about_ca_system_score_gemma":0.0018181838,"threshold_uncertainty_score":0.06783682},"labels":[],"label_agreement":null},{"id":"W3203845064","doi":"10.5267/j.jpm.2021.7.003","title":"Assessing public sector road construction projects’ critical success factors in a developing economy: Definitive stakeholders’ perspective","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Language change; Context (archaeology); Public sector; Critical success factor; Government (linguistics); Business; Order (exchange); Payment; Politics; Finance; Marketing; Political science; Economics; Economy; Geography; Law","score_opus":0.3750815954891311,"score_gpt":0.42967026342328707,"score_spread":0.054588667934155954,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3203845064","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9952094,0.00007391987,0.0012325491,0.00020981376,0.0000020372613,0.000045859695,0.000028841236,0.0000033220147,0.0031943696],"genre_scores_gemma":[0.99942374,0.0000582183,0.00038489472,0.0000062348035,7.768226e-7,0.000012847393,0.0000099683575,7.4913413e-7,0.000102547354],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99612325,0.0019665859,0.00022265811,0.00015533048,0.0008690855,0.00066304515],"domain_scores_gemma":[0.98310834,0.00933398,0.0035706572,0.00028272753,0.0024650733,0.0012392235],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0069379713,0.00037355657,0.00030018218,0.003432255,0.0015561522,0.0025350256,0.00030848038,0.00042416507,0.0019167456],"category_scores_gemma":[0.016269103,0.0002628466,0.00016543352,0.0026675342,0.0017403506,0.002043604,0.002359792,0.0005811384,0.0001355544],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032344682,0.00031475708,0.70122355,0.00074522715,0.00006734679,0.0027300345,0.16589452,0.0018215778,0.0060675843,0.008840323,0.00089976465,0.11107191],"study_design_scores_gemma":[0.000008079603,0.00037624672,0.48762518,0.00031023676,0.000030375513,0.0006966037,0.4965181,0.0019387008,0.0018373674,0.0030601493,0.0075512994,0.00004755725],"about_ca_topic_score_codex":0.0027616355,"about_ca_topic_score_gemma":0.004789836,"teacher_disagreement_score":0.0069379713,"about_ca_system_score_codex":0.002307944,"about_ca_system_score_gemma":0.0029982603,"threshold_uncertainty_score":0.036691904},"labels":[],"label_agreement":null},{"id":"W3204810767","doi":"10.5267/j.jpm.2021.7.002","title":"The utilization of project risk monitoring and control practices and their relationship with project success in construction projects","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Project risk management; Risk management plan; Risk management; Risk analysis (engineering); Audit; Control (management); Risk assessment; Business; IT risk management; Project manager; Project management; Identification (biology); Project management triangle; Operations management; Engineering; Accounting; Computer science; Finance; Computer security; Systems engineering","score_opus":0.13300200339623194,"score_gpt":0.39163670869259215,"score_spread":0.25863470529636023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3204810767","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99895155,0.00007580916,0.0002293817,0.00005932447,0.0000014684416,0.000012228761,0.000010811436,0.000004103386,0.00065531826],"genre_scores_gemma":[0.99959844,0.00007143043,0.00020030657,0.000005078993,0.000001904154,0.000010452622,0.000014728755,0.0000016929195,0.000095906806],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99340606,0.0031914534,0.00069167785,0.00029795567,0.0018235644,0.00058923423],"domain_scores_gemma":[0.934499,0.0256087,0.027780663,0.0020076963,0.0059106294,0.004193349],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0063691204,0.0002971933,0.00023364657,0.0016334334,0.00066470384,0.0013303707,0.0004122006,0.00035791812,0.0007341837],"category_scores_gemma":[0.031144027,0.00026397873,0.0003203169,0.0011945689,0.0011515833,0.00096609275,0.0013451228,0.000846765,0.00013585032],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000326095,0.0001697231,0.9877522,0.000024585754,0.00004841663,0.000059072507,0.0016955729,0.0002758527,0.00022908305,0.00008602673,0.00007024225,0.009556499],"study_design_scores_gemma":[0.0000017674271,0.00017521066,0.9958462,0.00002313245,0.000012318543,0.00007491098,0.002956446,0.0004599786,0.00014257572,0.000049301198,0.0002474965,0.000010654701],"about_ca_topic_score_codex":0.0049549188,"about_ca_topic_score_gemma":0.005849786,"teacher_disagreement_score":0.0063691204,"about_ca_system_score_codex":0.0006408011,"about_ca_system_score_gemma":0.0012765768,"threshold_uncertainty_score":0.03368348},"labels":[],"label_agreement":null},{"id":"W3207272659","doi":"10.5430/jbar.v10n2p57","title":"Assesment of Stakeholder Participation as Criterion for Sustainability of Community Based Public Health Projects in Western Kenya","year":2021,"lang":"en","type":"article","venue":"Journal of Business Administration Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Stakeholder; Sustainability; Project commissioning; Population; Stakeholder analysis; Business; Public participation; Stakeholder engagement; Environmental resource management; Public relations; Political science; Publishing; Sociology; Economics","score_opus":0.6326973480344938,"score_gpt":0.5611124939238276,"score_spread":0.07158485411066629,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3207272659","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99793893,0.000056218596,0.00017310948,0.00006122623,0.0000017010043,0.00008458241,0.000019949448,9.0272994e-7,0.0016634042],"genre_scores_gemma":[0.9995035,0.000046689405,0.0002482972,0.0000071130094,0.0000012426793,0.00004297326,0.000013319912,5.3321884e-7,0.00013632228],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98921084,0.0065962914,0.00093762396,0.0003851013,0.0019102509,0.00095990393],"domain_scores_gemma":[0.97982705,0.009417993,0.0064237295,0.00056428066,0.002704696,0.0010621491],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012354961,0.00019729392,0.00024764313,0.0019139706,0.0014810968,0.0013886509,0.00038304357,0.00040889357,0.00088559557],"category_scores_gemma":[0.027011167,0.0002547311,0.0002848966,0.0014821832,0.0015319095,0.0012531911,0.001750206,0.00047117574,0.000085656815],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017425013,0.00020643044,0.92070484,0.00018538997,0.000032883316,0.00060072076,0.057559982,0.0002558501,0.001553758,0.00063078344,0.00015771278,0.01793743],"study_design_scores_gemma":[0.000004422088,0.00042602778,0.9220043,0.00013431338,0.000017888153,0.00033367038,0.0736003,0.00088310667,0.0008873489,0.0003340697,0.0013498453,0.000024737123],"about_ca_topic_score_codex":0.006109896,"about_ca_topic_score_gemma":0.013871506,"teacher_disagreement_score":0.012354961,"about_ca_system_score_codex":0.001392821,"about_ca_system_score_gemma":0.0019699933,"threshold_uncertainty_score":0.06534004},"labels":[],"label_agreement":null},{"id":"W3207690770","doi":"10.1016/j.plas.2021.100031","title":"Balancing leadership in projects: Role of the socio-cognitive space","year":2021,"lang":"en","type":"article","venue":"Project Leadership and Society","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Cognition; Empowerment; Space (punctuation); Knowledge management; Cognitive map; Point (geometry); Psychology; Sociology; Computer science; Political science","score_opus":0.23582046341098786,"score_gpt":0.3427894550272393,"score_spread":0.10696899161625142,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3207690770","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9105675,0.001402759,0.018294511,0.0024044928,0.00005050185,0.00006790953,0.000010998396,0.000043544784,0.067157775],"genre_scores_gemma":[0.9989183,0.000098776625,0.00075581204,0.000014940557,0.0000052955465,0.000009139514,0.0000017793751,0.0000024026526,0.00019367192],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9888814,0.00853273,0.00020259434,0.00039148534,0.0010145494,0.0009772537],"domain_scores_gemma":[0.9894274,0.0060568536,0.0017580634,0.00049306365,0.00066270743,0.0016018689],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0073034554,0.00035999395,0.00028638626,0.0019481889,0.0031902,0.009279294,0.00082207215,0.0008617366,0.002073124],"category_scores_gemma":[0.016002996,0.00023258191,0.00024930312,0.001165722,0.0153329335,0.0054088775,0.008630447,0.0009245485,0.00017563318],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003107394,0.00036280954,0.07064514,0.0004494247,0.00011737178,0.0016491184,0.2784702,0.006753423,0.0051509063,0.42951885,0.0011248011,0.20544726],"study_design_scores_gemma":[0.0000935523,0.00074233784,0.1221523,0.00057479594,0.00006385623,0.0009767344,0.47747412,0.012092242,0.0016696781,0.34755892,0.036459785,0.00014168462],"about_ca_topic_score_codex":0.0015121361,"about_ca_topic_score_gemma":0.0016497697,"teacher_disagreement_score":0.009279294,"about_ca_system_score_codex":0.0019297218,"about_ca_system_score_gemma":0.002723586,"threshold_uncertainty_score":0.038624883},"labels":[],"label_agreement":null},{"id":"W3207962055","doi":"10.1080/01446193.2021.1983851","title":"Transforming construction: heterarchical megaproject ecologies and the management of innovation","year":2021,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Megaproject; Conceptualization; Knowledge management; Corporate governance; Business; Process management; Engineering; Computer science; Systems engineering","score_opus":0.056851571158210816,"score_gpt":0.3015648291996323,"score_spread":0.24471325804142147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3207962055","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7668332,0.0010656922,0.13502777,0.0046854,0.000043094104,0.0002566538,0.00013309768,0.00010953746,0.09184561],"genre_scores_gemma":[0.9918611,0.00015944663,0.0064243325,0.00005663879,0.000010110123,0.00008623742,0.000024867022,0.000011428312,0.0013657175],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99468577,0.0031154514,0.00021929806,0.0006728608,0.0006105493,0.0006960849],"domain_scores_gemma":[0.99157023,0.0033218204,0.0016303837,0.0014616854,0.0005643315,0.0014515122],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052229273,0.00023954203,0.00041916192,0.0025038992,0.0027732896,0.007904827,0.0011471792,0.0011102485,0.0033291262],"category_scores_gemma":[0.008360493,0.00032125975,0.00042637283,0.0023194498,0.015066719,0.006138328,0.007957183,0.0009380901,0.00021830907],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007434248,0.00018857348,0.07253098,0.00014605443,0.00011642153,0.000516464,0.018254992,0.01835249,0.001249309,0.8259297,0.0009918032,0.06164898],"study_design_scores_gemma":[0.0000502749,0.00023555472,0.12090087,0.0003127201,0.000050434905,0.00052324083,0.04331612,0.027900457,0.0006583732,0.7522489,0.053720407,0.00008257834],"about_ca_topic_score_codex":0.0033072394,"about_ca_topic_score_gemma":0.0067148237,"teacher_disagreement_score":0.007904827,"about_ca_system_score_codex":0.0048593446,"about_ca_system_score_gemma":0.004122768,"threshold_uncertainty_score":0.03525716},"labels":[],"label_agreement":null},{"id":"W3209586552","doi":"10.1109/tem.2021.3119064","title":"Risk and Uncertainty in the Cost Contingency of Transport Projects: Accommodating Bias or Heuristics, or Both?","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Engineering Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Australian Research Council; University of Ottawa","keywords":"Heuristics; Cost contingency; Contingency; Computer science; Cost estimate; Operations research; Economics; Contingency theory; Risk analysis (engineering); Management science; Heuristic; Microeconomics; Total cost; Business; Relevant cost; Engineering; Artificial intelligence; Knowledge management","score_opus":0.08702612711473101,"score_gpt":0.3168473593871864,"score_spread":0.22982123227245538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3209586552","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18697962,0.030028002,0.6505678,0.07088083,0.0011419888,0.00035336684,0.00044157295,0.0002527126,0.05935404],"genre_scores_gemma":[0.91117424,0.006166147,0.07922671,0.0018248473,0.00041244636,0.0001347265,0.000084378065,0.00005660064,0.00092006015],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9846244,0.008735587,0.00093973434,0.0009391905,0.0036274223,0.001133722],"domain_scores_gemma":[0.94657636,0.03894231,0.0083548315,0.0024911233,0.0030036303,0.00063174084],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019126862,0.0007363061,0.0012651496,0.0038995096,0.0012619374,0.008263418,0.0017105907,0.0023038809,0.0018345629],"category_scores_gemma":[0.06976153,0.0006322294,0.0012103843,0.0037955283,0.008990096,0.011849944,0.0034467687,0.0033535617,0.00022612908],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001473829,0.000068129055,0.020238187,0.00080033357,0.000347347,0.00023929225,0.0040267296,0.07123004,0.00037328136,0.73907715,0.0029243135,0.16052772],"study_design_scores_gemma":[0.0000226564,0.00011653473,0.008779068,0.0012783484,0.00014484998,0.00016224007,0.0038672113,0.030457374,0.00054907514,0.9389835,0.015505982,0.0001332015],"about_ca_topic_score_codex":0.0073554153,"about_ca_topic_score_gemma":0.009916291,"teacher_disagreement_score":0.019126862,"about_ca_system_score_codex":0.00556345,"about_ca_system_score_gemma":0.004735142,"threshold_uncertainty_score":0.10115373},"labels":[],"label_agreement":null},{"id":"W3210431679","doi":"10.3390/buildings11110502","title":"Collaborative Interorganizational Relationships in a Project-Based Industry","year":2021,"lang":"en","type":"article","venue":"Buildings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Conceptualization; Knowledge management; Business; Integrated project delivery; Identification (biology); Multitude; Categorization; Resource (disambiguation); Process management; Enterprise resource planning; Computer science; Project management; Engineering; Systems engineering; Political science","score_opus":0.09065590146047824,"score_gpt":0.3703784239611648,"score_spread":0.2797225225006866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3210431679","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7219429,0.051198464,0.09613259,0.0077903224,0.0001727799,0.0013085724,0.00020173527,0.000078776764,0.121173866],"genre_scores_gemma":[0.9758079,0.01059689,0.0116398055,0.00021638218,0.000023717328,0.00026841662,0.00007207695,0.000006753974,0.0013680267],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.96386766,0.03025851,0.0015328141,0.00086066755,0.0026162434,0.00086415315],"domain_scores_gemma":[0.96600235,0.026400922,0.0035968586,0.0011258014,0.001957642,0.0009163443],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01878944,0.00022038499,0.00041327137,0.006938638,0.0028863954,0.007335816,0.00088060956,0.0011466127,0.0017779244],"category_scores_gemma":[0.021066336,0.0003321828,0.0003456021,0.009381514,0.006013116,0.007396416,0.0057909163,0.00090798433,0.00019407412],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000119776334,0.00031562292,0.036690954,0.0070828083,0.00039395716,0.0055639795,0.24553615,0.0040736576,0.0022813021,0.3268295,0.0031553176,0.36795697],"study_design_scores_gemma":[0.000075225704,0.00055348664,0.0418642,0.008854858,0.00029831295,0.003732319,0.5592871,0.0030820628,0.0019814672,0.13771698,0.24241073,0.00014324547],"about_ca_topic_score_codex":0.0014038406,"about_ca_topic_score_gemma":0.0031763357,"teacher_disagreement_score":0.01878944,"about_ca_system_score_codex":0.0028073993,"about_ca_system_score_gemma":0.0066449614,"threshold_uncertainty_score":0.09936923},"labels":[],"label_agreement":null},{"id":"W3210763646","doi":"10.3390/jrfm14110518","title":"Level of Financial Performance of Selected Construction Companies in South Africa","year":2021,"lang":"en","type":"article","venue":"Journal of risk and financial management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Tertiary Education Trust Fund; National Research Foundation","keywords":"Market liquidity; Revenue; Finance; Originality; Cash flow; Profitability index; Business; Credibility; Leverage (statistics); Financial analysis; Financial management; Accounting; Qualitative research","score_opus":0.06287717824224846,"score_gpt":0.28347763326085806,"score_spread":0.2206004550186096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3210763646","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99923325,0.000054331398,0.00001896241,0.000050364382,8.697538e-7,0.000008034612,0.000078459125,5.1700886e-7,0.00055521127],"genre_scores_gemma":[0.9996424,0.00006731375,0.000038810434,0.0000072799935,0.0000012872335,0.0000069524503,0.000062340834,3.7299358e-7,0.00017323787],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999052,0.00020737447,0.00011015319,0.000083171304,0.00026099914,0.00028631187],"domain_scores_gemma":[0.99617285,0.00062235864,0.0019964804,0.0000636735,0.0005995733,0.0005450459],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011722925,0.00023328904,0.00020818778,0.0031885735,0.0010633781,0.0013880335,0.0002591874,0.00030487566,0.002837856],"category_scores_gemma":[0.004196916,0.00016676183,0.00015547851,0.0026080715,0.0007942746,0.000655942,0.001091072,0.00027124435,0.00029798827],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008951791,0.00005348316,0.9854375,0.00005514539,0.000019286594,0.00035084866,0.006001131,0.00015134996,0.00076237274,0.000202805,0.00020447126,0.006671969],"study_design_scores_gemma":[0.000002524473,0.0001108817,0.9851046,0.000034711393,0.0000063680236,0.00024264473,0.013349612,0.00016303235,0.00022707164,0.000038222206,0.00071267894,0.000007699542],"about_ca_topic_score_codex":0.009004191,"about_ca_topic_score_gemma":0.012690005,"teacher_disagreement_score":0.009004191,"about_ca_system_score_codex":0.001502425,"about_ca_system_score_gemma":0.00092048163,"threshold_uncertainty_score":0.017903507},"labels":[],"label_agreement":null},{"id":"W3211157468","doi":"10.5539/jsd.v14n6p15","title":"Subcontractor Oversight on Construction Cost Overruns in Real Estate Projects in Nairobi and Kisumu Counties, Kenya","year":2021,"lang":"en","type":"article","venue":"Journal of Sustainable Development","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Real estate; Stratified sampling; Sample (material); Business; Nonprobability sampling; Estate; Population; Real estate development; Sample size determination; Simple random sample; Finance; Data collection; Operations management; Engineering; Environmental health","score_opus":0.041507410418377216,"score_gpt":0.3099887180502655,"score_spread":0.26848130763188827,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3211157468","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9990227,0.000086772496,0.000021567168,0.000071536844,0.0000010862202,0.000008974257,0.000015264051,3.6047217e-7,0.00077177794],"genre_scores_gemma":[0.9993926,0.00013937894,0.000064570435,0.000019042842,0.0000011477787,0.000007706421,0.000015929776,7.167561e-7,0.00035881155],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99802893,0.0008633723,0.00014389784,0.0001517997,0.000410226,0.0004018565],"domain_scores_gemma":[0.9950074,0.0010467945,0.0027078392,0.00010036416,0.00064574403,0.00049190776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014226157,0.00016493801,0.00019173216,0.0006541683,0.0012167043,0.00089167623,0.0003856527,0.0002679259,0.001912278],"category_scores_gemma":[0.0057712896,0.0002501858,0.00015289702,0.0011043866,0.00076783844,0.0006273492,0.0011702017,0.0003653378,0.00010824767],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000062592175,0.00009583596,0.97355765,0.0000947068,0.00002912731,0.0008022028,0.012144548,0.00023034622,0.00070258905,0.0003536185,0.00036401307,0.011562787],"study_design_scores_gemma":[0.0000015522598,0.000034156168,0.9777405,0.000049370134,0.000010527599,0.00009124865,0.020651689,0.00011429198,0.00006850018,0.000031231688,0.0012018862,0.0000050654576],"about_ca_topic_score_codex":0.0653327,"about_ca_topic_score_gemma":0.24908955,"teacher_disagreement_score":0.0653327,"about_ca_system_score_codex":0.0022980452,"about_ca_system_score_gemma":0.0031968076,"threshold_uncertainty_score":0.12990487},"labels":[],"label_agreement":null},{"id":"W3212537810","doi":"10.1108/bepam-04-2021-0063","title":"Framework for identification of performance metrics for research and development collaborations: Construction Innovation Centre","year":2021,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Identification (biology); Originality; Context (archaeology); Knowledge management; Outreach; Computer science; Process management; Engineering management; Management science; Engineering; Qualitative research","score_opus":0.2631372235762758,"score_gpt":0.4285962629288709,"score_spread":0.1654590393525951,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3212537810","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":"evaluation","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":"evaluation","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018369092,0.00559067,0.8163606,0.016295698,0.00056656107,0.008108507,0.0023507883,0.0011853882,0.13117269],"genre_scores_gemma":[0.1902837,0.0016111283,0.79547715,0.00058460986,0.00010715967,0.007564119,0.0014353005,0.000145825,0.002791016],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.8420833,0.099176496,0.017324377,0.00727879,0.027247557,0.0068894066],"domain_scores_gemma":[0.8522918,0.07003009,0.018052224,0.008251427,0.044446155,0.006928349],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.1038727,0.003936983,0.0027166645,0.042040847,0.0066974116,0.025691533,0.005975139,0.0058148685,0.0065794727],"category_scores_gemma":[0.11862334,0.0011397392,0.004375512,0.028343882,0.014155295,0.018151851,0.015432432,0.004626287,0.002288341],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010227754,0.00030644488,0.010021127,0.0030436881,0.00019213086,0.00020564643,0.009112917,0.008857181,0.00047833635,0.83690304,0.011297339,0.11947988],"study_design_scores_gemma":[0.00017894975,0.00084543787,0.020210607,0.010838936,0.0003955035,0.0008564223,0.035608727,0.044811614,0.0021686493,0.6251524,0.2584231,0.0005096484],"about_ca_topic_score_codex":0.022158071,"about_ca_topic_score_gemma":0.015710328,"teacher_disagreement_score":0.8961273,"about_ca_system_score_codex":0.037599936,"about_ca_system_score_gemma":0.04971669,"threshold_uncertainty_score":0.5493379},"labels":[],"label_agreement":null},{"id":"W3213702410","doi":"10.1201/9781315373928-24","title":"Flexibility and Rigidity in Planning a Program: The Case of the Montreal Metro Renovation Project","year":2016,"lang":"en","type":"book-chapter","venue":"Auerbach Publications eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Flexibility (engineering); Rigidity (electromagnetism); Engineering; Architectural engineering; Transport engineering; Computer science; Management; Structural engineering; Economics","score_opus":0.18230393901423164,"score_gpt":0.40371513814281285,"score_spread":0.2214111991285812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3213702410","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31589043,0.0024784897,0.012537841,0.024921292,0.00013234054,0.0002566394,0.0001280331,0.000090398215,0.6435645],"genre_scores_gemma":[0.8871239,0.0011679442,0.0047433283,0.00072708004,0.00003105366,0.00009626092,0.000057490983,0.000049612776,0.10600332],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9976152,0.0010912209,0.000022869099,0.00010894557,0.00037934826,0.0007824021],"domain_scores_gemma":[0.9989604,0.000403698,0.00007787259,0.000061965475,0.000119416974,0.00037660438],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002162,0.00046128102,0.00018158666,0.0007721731,0.009299266,0.005121994,0.00186688,0.002449388,0.0069727204],"category_scores_gemma":[0.0035086847,0.00038132753,0.0003461089,0.0019952205,0.006303764,0.0020485558,0.0029084522,0.0023741245,0.00030648115],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010086046,0.00012538792,0.0069843484,0.00012226251,0.000029215309,0.007847088,0.04497197,0.032819517,0.00087100687,0.78432477,0.045029756,0.076773934],"study_design_scores_gemma":[0.00011650314,0.00022382376,0.03163317,0.00043473305,0.000052595427,0.0015186167,0.10903648,0.029562645,0.0010546906,0.09084847,0.7352978,0.00022047773],"about_ca_topic_score_codex":0.6822767,"about_ca_topic_score_gemma":0.8405989,"teacher_disagreement_score":0.31772327,"about_ca_system_score_codex":0.024889838,"about_ca_system_score_gemma":0.015752207,"threshold_uncertainty_score":0.63918877},"labels":[],"label_agreement":null},{"id":"W3213789125","doi":"10.5539/jsd.v14n6p54","title":"An Analysis of the Relationship between Value Diversity and Project Implementation. A Case of Building Construction Projects in Kajiado County, Kenya, Africa.","year":2021,"lang":"en","type":"article","venue":"Journal of Sustainable Development","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Diversity (politics); Descriptive statistics; Government (linguistics); Value (mathematics); Stratified sampling; Project team; Building construction; Work (physics); Business; Statistics; Sociology; Engineering; Computer science; Knowledge management; Mathematics","score_opus":0.09834294874267568,"score_gpt":0.3742424916422134,"score_spread":0.2758995428995377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3213789125","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99570066,0.00015411418,0.00030057717,0.00028277194,0.0000028768138,0.000053973425,0.00002780551,0.000001458563,0.0034757121],"genre_scores_gemma":[0.9992167,0.00014091762,0.00028714587,0.000012774878,8.858368e-7,0.000025104218,0.000014477821,7.7340735e-7,0.0003012987],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9962288,0.002285987,0.00015644502,0.00017476521,0.00044279126,0.0007112623],"domain_scores_gemma":[0.9889783,0.006527265,0.0023445752,0.00015979506,0.0012173175,0.00077280577],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004021888,0.00024026437,0.00021862444,0.0020985424,0.0038439566,0.0021864334,0.00067383755,0.00053687324,0.001588244],"category_scores_gemma":[0.0107300645,0.000334299,0.00026299598,0.0030857713,0.0020186056,0.0012104403,0.0021979075,0.0008880804,0.00010006467],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019567304,0.00055020023,0.6019747,0.0006758562,0.00011045894,0.012243522,0.31773615,0.0015674584,0.0015097746,0.009518416,0.0009687982,0.052948996],"study_design_scores_gemma":[0.0000065814047,0.00023278907,0.51007766,0.00030169621,0.00004545281,0.0007511485,0.48147172,0.0012843824,0.0003909103,0.00048895465,0.004925873,0.000022818911],"about_ca_topic_score_codex":0.03217589,"about_ca_topic_score_gemma":0.05557675,"teacher_disagreement_score":0.03217589,"about_ca_system_score_codex":0.0062253177,"about_ca_system_score_gemma":0.0053721885,"threshold_uncertainty_score":0.06397724},"labels":[],"label_agreement":null},{"id":"W3215559052","doi":"10.3390/jrfm14120571","title":"Project Management Maturity Models for Construction Firms","year":2021,"lang":"en","type":"article","venue":"Journal of risk and financial management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Maturity (psychological); Capability Maturity Model; Project management; OPM3; Service Integration Maturity Model; Process management; Computer science; Business; Project management triangle; Knowledge management; Engineering management; Engineering; Systems engineering","score_opus":0.04442198363689438,"score_gpt":0.31593313245280485,"score_spread":0.2715111488159105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3215559052","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5975866,0.005056672,0.30617744,0.005042959,0.0000722192,0.0012668574,0.0016456511,0.00045877023,0.08269287],"genre_scores_gemma":[0.9314344,0.0012602822,0.063222095,0.00006717569,0.000013487516,0.0005716726,0.0011741157,0.000025848767,0.0022309641],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99780434,0.000948674,0.00025590646,0.00017417454,0.0005853558,0.00023159341],"domain_scores_gemma":[0.9873094,0.0076255123,0.0019641796,0.00051185355,0.0022439936,0.00034500644],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006194745,0.00045026472,0.00027720147,0.005178634,0.0006771284,0.0037251348,0.00076521136,0.00096681324,0.002682437],"category_scores_gemma":[0.022606716,0.00024832337,0.0009493184,0.004711882,0.00041814125,0.0044290507,0.0013419184,0.0010646492,0.0005070321],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002643918,0.00061832473,0.07691673,0.00074379286,0.0001768178,0.00064592564,0.006701341,0.13028903,0.002037725,0.482506,0.006014684,0.29308522],"study_design_scores_gemma":[0.00007959252,0.0006022794,0.08310706,0.0011896184,0.000118944765,0.00064867083,0.009801492,0.57509166,0.0015242668,0.2720135,0.055661596,0.0001614209],"about_ca_topic_score_codex":0.007369477,"about_ca_topic_score_gemma":0.0050320653,"teacher_disagreement_score":0.007369477,"about_ca_system_score_codex":0.004321679,"about_ca_system_score_gemma":0.0031992914,"threshold_uncertainty_score":0.032761335},"labels":[],"label_agreement":null},{"id":"W3216492845","doi":"10.3390/buildings11120567","title":"Megaproject Management Research: The Status Quo and Future Directions","year":2021,"lang":"en","type":"article","venue":"Buildings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"National Social Science Fund of China; Guangzhou University","keywords":"Megaproject; Status quo; Engineering ethics; Management science; Process management; Knowledge management; Political science; Engineering; Computer science; Systems engineering","score_opus":0.15290924982054485,"score_gpt":0.4213571499613483,"score_spread":0.26844790014080344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3216492845","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0050244182,0.75576633,0.0016922177,0.22922973,0.00346922,0.00004923195,0.000120688535,0.000036184745,0.0046120263],"genre_scores_gemma":[0.082823314,0.8784709,0.008014912,0.023024952,0.0058321957,0.00023632144,0.00028314252,0.000044766854,0.0012694737],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9646123,0.016560154,0.0040479423,0.0042186123,0.008546968,0.0020140791],"domain_scores_gemma":[0.8029424,0.14417404,0.011162222,0.004177738,0.02981625,0.007727423],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.085413575,0.0010127327,0.0029120941,0.009069455,0.0045095338,0.02154285,0.0035596327,0.010309166,0.007458687],"category_scores_gemma":[0.064266324,0.0008519499,0.0014479307,0.015165108,0.015325885,0.04070041,0.006268586,0.009098493,0.0015327104],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004815732,0.0003516898,0.010751635,0.03930893,0.0001391613,0.00043077077,0.010747355,0.00059484644,0.0010452667,0.13467716,0.029249096,0.77222246],"study_design_scores_gemma":[0.00013264155,0.0009255057,0.025245352,0.12420399,0.00034924442,0.0014209485,0.10873592,0.0028953047,0.0008041017,0.20870951,0.5262419,0.000335638],"about_ca_topic_score_codex":0.006101222,"about_ca_topic_score_gemma":0.0068289884,"teacher_disagreement_score":0.085413575,"about_ca_system_score_codex":0.013235421,"about_ca_system_score_gemma":0.034084402,"threshold_uncertainty_score":0.4517156},"labels":[],"label_agreement":null},{"id":"W3216683777","doi":"10.1108/jaoc-04-2021-0048","title":"From interactive control to IT project performance: examining the mediating role of stakeholder analysis effectiveness","year":2021,"lang":"en","type":"article","venue":"Journal of Accounting & Organizational Change","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Operationalization; Stakeholder; Stakeholder analysis; Knowledge management; Structural equation modeling; Project stakeholder; Process management; Project management; Construct (python library); Control (management); Originality; Conceptual framework; Business; Computer science; Project management triangle; Psychology; OPM3; Engineering; Management; Sociology; Systems engineering; Economics; Social psychology","score_opus":0.10772336409236291,"score_gpt":0.34813742399409586,"score_spread":0.24041405990173295,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3216683777","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97935325,0.00022765863,0.0076961634,0.000540839,0.000008506069,0.00009348733,0.000023349554,0.000019475821,0.012037246],"genre_scores_gemma":[0.9993198,0.00003746859,0.000503486,0.00001368515,0.0000025561533,0.000021101583,0.0000048975626,0.0000029779676,0.00009400084],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9686177,0.023706367,0.0010688076,0.00116098,0.0034201748,0.002026036],"domain_scores_gemma":[0.81842256,0.1396916,0.024044264,0.0057734866,0.007445023,0.004623064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020485673,0.0007231523,0.00045379676,0.0019709957,0.0015926469,0.004571149,0.000837981,0.00057517004,0.0036711502],"category_scores_gemma":[0.08060657,0.00038888768,0.0005172961,0.0012417034,0.0044534444,0.0032332498,0.0054256334,0.0012628428,0.00015956024],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007653704,0.0012595444,0.7699395,0.000772205,0.00053623784,0.0007379243,0.062654786,0.0042484826,0.00397203,0.02319224,0.00040402502,0.13151766],"study_design_scores_gemma":[0.00008766372,0.0020429404,0.85597086,0.0010240354,0.0004698317,0.0005190945,0.09563006,0.016021028,0.006811441,0.016445024,0.0048328824,0.00014514466],"about_ca_topic_score_codex":0.0039780396,"about_ca_topic_score_gemma":0.0025930442,"teacher_disagreement_score":0.020485673,"about_ca_system_score_codex":0.0023680145,"about_ca_system_score_gemma":0.0039674956,"threshold_uncertainty_score":0.108339846},"labels":[],"label_agreement":null},{"id":"W32464566","doi":"","title":"TRANS-DISCIPLINARY MANAGEMENT AND PARTNERING TO BETTER COLLABORATE AND INNOVATE IN A GLOBAL CONTEXT","year":2008,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Context (archaeology); Enthusiasm; Government (linguistics); Knowledge management; Competition (biology); Stakeholder; Project management; Public relations; Marketing; Process management; Management; Economics; Political science; Computer science","score_opus":0.09601085425629687,"score_gpt":0.3656708637856503,"score_spread":0.26966000952935343,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W32464566","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40696895,0.003851239,0.14312682,0.030809471,0.00057697395,0.00096001284,0.000025593652,0.00032133286,0.41335958],"genre_scores_gemma":[0.96031916,0.0012870352,0.022081792,0.0018852003,0.00011696932,0.0004372104,0.00003126885,0.00006137115,0.01377997],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.97012097,0.021387892,0.0008841398,0.0021911375,0.0028640176,0.0025518762],"domain_scores_gemma":[0.98439664,0.0028284292,0.0021791907,0.0018510388,0.00206415,0.0066805407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0195358,0.00071923167,0.000491248,0.002599575,0.0064190244,0.011793465,0.0020793008,0.002337262,0.007729074],"category_scores_gemma":[0.015086056,0.00040839316,0.00048789667,0.0020439152,0.012657129,0.008597935,0.022177905,0.0032449546,0.0017542796],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001295291,0.0012415875,0.0390443,0.0008956539,0.00030764463,0.0031576154,0.18355839,0.004100798,0.00843914,0.31070396,0.019188462,0.42923287],"study_design_scores_gemma":[0.00010371441,0.0008902661,0.028696602,0.0010494386,0.00010721319,0.0026516384,0.24512203,0.005852601,0.00263331,0.29075548,0.42195836,0.00017934278],"about_ca_topic_score_codex":0.0010568656,"about_ca_topic_score_gemma":0.0016115913,"teacher_disagreement_score":0.0195358,"about_ca_system_score_codex":0.0021820965,"about_ca_system_score_gemma":0.0068687177,"threshold_uncertainty_score":0.10331637},"labels":[],"label_agreement":null},{"id":"W32984330","doi":"10.3389/fcell.2020.00835","title":"Cuáles son los seguros obligatorios en la construcción","year":2008,"lang":"en","type":"article","venue":"Inmueble: Revista del sector inmobiliario","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Political science","score_opus":0.06444925571953011,"score_gpt":0.3308033232342433,"score_spread":0.26635406751471313,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W32984330","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38076454,0.029568044,0.22947595,0.020435248,0.0024920804,0.0007590572,0.002922027,0.0045714118,0.3290116],"genre_scores_gemma":[0.46831906,0.030249266,0.29998147,0.0013282755,0.00058254483,0.0008339585,0.0037360068,0.0014454634,0.19352388],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99679357,0.0011224999,0.00021058088,0.0006551023,0.00094436575,0.0002739495],"domain_scores_gemma":[0.99640745,0.0008032915,0.0006090628,0.0008886947,0.0008070556,0.00048439758],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004548257,0.0010445402,0.0005313359,0.0013060514,0.0017931695,0.0046718447,0.0012803033,0.0011237956,0.0115091745],"category_scores_gemma":[0.0046426035,0.00044620963,0.0005771382,0.0012555843,0.0017424603,0.0021368128,0.0023549541,0.0012073795,0.005056411],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043980085,0.00026346245,0.04274831,0.0011155803,0.00007130279,0.0012014455,0.00502254,0.0026834104,0.02668393,0.14993699,0.025645597,0.7441876],"study_design_scores_gemma":[0.000034833443,0.00022836475,0.027544435,0.000986906,0.000107645996,0.00074570783,0.0042027812,0.002277922,0.014025225,0.015779464,0.93398094,0.00008566407],"about_ca_topic_score_codex":0.009067184,"about_ca_topic_score_gemma":0.021438621,"teacher_disagreement_score":0.0115091745,"about_ca_system_score_codex":0.002815068,"about_ca_system_score_gemma":0.0070346883,"threshold_uncertainty_score":0.038502038},"labels":[],"label_agreement":null},{"id":"W35363143","doi":"10.2196/36364","title":"Cost effective techniques for building construction in Sri Lanka","year":2006,"lang":"en","type":"dissertation","venue":"JMIR Cancer","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Institute for Health and Care Research","keywords":"Sri lanka; Construction engineering; Architectural engineering; Computer science; Engineering; Geography; Environmental planning","score_opus":0.05565477077177629,"score_gpt":0.4540395801813727,"score_spread":0.3983848094095964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W35363143","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72590417,0.00547102,0.041742172,0.0042109415,0.00023263333,0.0044420348,0.00083803775,0.0007214921,0.21643752],"genre_scores_gemma":[0.82962525,0.0040757125,0.13506179,0.00014394954,0.000038363796,0.0017933032,0.00046584508,0.00009210222,0.028703751],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99790895,0.00086570054,0.00012102434,0.00011870367,0.00063930417,0.0003464231],"domain_scores_gemma":[0.99887973,0.0003267924,0.0001407671,0.00025277448,0.00017219468,0.0002277079],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018273897,0.0009294478,0.0002672906,0.0040885764,0.0029479547,0.0023909507,0.0019556,0.00066852104,0.015306542],"category_scores_gemma":[0.0027521204,0.00044716385,0.0007435286,0.0030520975,0.001764469,0.00086242036,0.0039629685,0.0008857602,0.0014827584],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027982518,0.00207964,0.02062495,0.0027129415,0.00010298868,0.0016103627,0.012810531,0.008725802,0.0076914337,0.030882487,0.010674755,0.9018043],"study_design_scores_gemma":[0.0004479671,0.009098908,0.23935638,0.004220633,0.00043174022,0.00437939,0.12133562,0.016325004,0.01318983,0.036974855,0.553845,0.0003947245],"about_ca_topic_score_codex":0.012825137,"about_ca_topic_score_gemma":0.042200014,"teacher_disagreement_score":0.015306542,"about_ca_system_score_codex":0.0031842433,"about_ca_system_score_gemma":0.0066702142,"threshold_uncertainty_score":0.051205456},"labels":[],"label_agreement":null},{"id":"W374085433","doi":"","title":"Building a sustainable future : proceedings of the 2009 Construction Research Congress, April 5-7, 2009, Seattle, Washington","year":2009,"lang":"en","type":"book","venue":"American Society of Civil Engineers eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Procurement; Engineering; Construction management; Project management; Construction industry; Environmental planning; Political science; Business; Civil engineering; Geography; Construction engineering","score_opus":0.02797909576351849,"score_gpt":0.3124984361051948,"score_spread":0.2845193403416763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W374085433","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019537453,0.18686588,0.0052748807,0.037416194,0.04650984,0.00022829574,0.0026172264,0.00071318547,0.71842074],"genre_scores_gemma":[0.0033945728,0.0486127,0.0015665463,0.0012440342,0.0019058706,0.000117057534,0.0011856083,0.0001672337,0.94180644],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99936,0.00007719052,0.00003475608,0.00008795566,0.00038829475,0.000051736206],"domain_scores_gemma":[0.99929833,0.000099557496,0.00004134006,0.000049565744,0.00036829204,0.00014283835],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015141339,0.0014180925,0.0006080765,0.0011628285,0.0012347861,0.00416413,0.0008039227,0.0016657076,0.095907815],"category_scores_gemma":[0.0015299692,0.00043470698,0.00035265405,0.0018640964,0.0005840437,0.0032034926,0.0016903148,0.003033327,0.038413636],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014057885,0.00001898038,0.00006435662,0.00008775995,0.0000027090034,0.000017176313,0.000061520004,0.000109739914,0.00011127646,0.0019841392,0.947979,0.049549457],"study_design_scores_gemma":[0.0000016255696,0.0000054617667,0.0002699795,0.00014366316,0.0000016500336,0.000019191584,0.00007070603,0.00002966348,0.000051370167,0.00043386655,0.9989692,0.0000036069653],"about_ca_topic_score_codex":0.007869574,"about_ca_topic_score_gemma":0.040154707,"teacher_disagreement_score":0.095907815,"about_ca_system_score_codex":0.0020615875,"about_ca_system_score_gemma":0.003875006,"threshold_uncertainty_score":0.32084358},"labels":[],"label_agreement":null},{"id":"W40900912","doi":"","title":"DEFINING KNOWLEDGE MANAGEMENT SYSTEM RISK","year":2011,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Risk management; Delphi method; Knowledge management; Risk management information systems; Risk analysis (engineering); Computer science; IT risk management; Measure (data warehouse); Set (abstract data type); Risk assessment; Business; Information system; Engineering; Management information systems; Data mining; Artificial intelligence; Computer security","score_opus":0.10805742862651162,"score_gpt":0.33907110408520613,"score_spread":0.2310136754586945,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W40900912","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5134266,0.0022005194,0.41835725,0.0044302535,0.00008967571,0.0013960745,0.00039432733,0.0002492387,0.059455957],"genre_scores_gemma":[0.9212663,0.0005430173,0.07640861,0.00021401008,0.00005421022,0.00043885977,0.00014902915,0.000025920557,0.00089996576],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.95883405,0.0144986855,0.0058275135,0.0015612497,0.017503746,0.0017747101],"domain_scores_gemma":[0.88834286,0.06777174,0.023088742,0.0037816057,0.015733613,0.001281457],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01847331,0.00095577334,0.0005882762,0.009255258,0.0018767294,0.008051748,0.0011955537,0.0024606897,0.0011778482],"category_scores_gemma":[0.07748323,0.00040572247,0.00094576733,0.0031689166,0.0048627886,0.0076261633,0.00633857,0.001852079,0.00025933818],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040632242,0.0005084614,0.22161233,0.0022388832,0.0005483857,0.0019198521,0.06293076,0.032955337,0.010908496,0.4147089,0.0023605188,0.24890178],"study_design_scores_gemma":[0.00012461325,0.002232661,0.1786527,0.0057801246,0.0007796774,0.007023407,0.07449439,0.13770814,0.025182342,0.467069,0.10020256,0.0007503929],"about_ca_topic_score_codex":0.002385316,"about_ca_topic_score_gemma":0.0010209029,"teacher_disagreement_score":0.01847331,"about_ca_system_score_codex":0.0039612954,"about_ca_system_score_gemma":0.0031305621,"threshold_uncertainty_score":0.09769738},"labels":[],"label_agreement":null},{"id":"W413454104","doi":"10.14914/spmj.9.1_32","title":"The Initiation Phase of Projects in Practice : a survey investigation","year":2007,"lang":"en","type":"article","venue":"Journal of the Society of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Phase (matter); Computer science; Chemistry","score_opus":0.16965593445496852,"score_gpt":0.43808077452559285,"score_spread":0.26842484007062434,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W413454104","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9961552,0.0001812192,0.0007228735,0.00019937477,0.0000057384873,0.00017005017,0.00011562059,0.000010776249,0.0024392034],"genre_scores_gemma":[0.99751365,0.00031155907,0.0009715546,0.00009925581,0.000007982912,0.00022543373,0.0001528747,0.00001126366,0.00070644333],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98600304,0.006617741,0.0018768227,0.0006713732,0.0031034555,0.0017277162],"domain_scores_gemma":[0.8637241,0.070931956,0.027227417,0.0036929287,0.022749191,0.011674456],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016445376,0.0001991195,0.00042599178,0.0043245894,0.0016591359,0.00342724,0.0009808004,0.0015248248,0.002416774],"category_scores_gemma":[0.08851239,0.000836478,0.0004367318,0.003008791,0.0011385618,0.0033107214,0.0029269184,0.0022484472,0.00085442583],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017422898,0.00053148874,0.9218266,0.00022684294,0.000027568974,0.0002677999,0.04943939,0.000088145105,0.00095441804,0.00063332974,0.0004898637,0.02534024],"study_design_scores_gemma":[0.00001484102,0.00080879376,0.86443555,0.0003014172,0.00002465314,0.00059643935,0.12623672,0.0006540798,0.00055068854,0.0002818541,0.006052094,0.000042884003],"about_ca_topic_score_codex":0.004346866,"about_ca_topic_score_gemma":0.007365306,"teacher_disagreement_score":0.016445376,"about_ca_system_score_codex":0.0020551407,"about_ca_system_score_gemma":0.0044581695,"threshold_uncertainty_score":0.086972535},"labels":[],"label_agreement":null},{"id":"W4200008734","doi":"10.11159/iccefa21.002","title":"Infrastructure Asset Management – A Systems Engineering Perspective","year":2021,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil Engineering Fundamentals and Applications, ICCEFA ...","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Asset management; Perspective (graphical); Asset (computer security); Computer science; Risk analysis (engineering); Business; Computer security; Finance","score_opus":0.03231546802075952,"score_gpt":0.29795309867057884,"score_spread":0.2656376306498193,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200008734","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03182252,0.02153355,0.7170527,0.031064488,0.00074600254,0.00022833893,0.00039871773,0.00042240368,0.19673142],"genre_scores_gemma":[0.7999234,0.035653155,0.14451683,0.0013947451,0.0015400959,0.00034360777,0.00035965338,0.00006446908,0.01620401],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9989208,0.00042184186,0.000057178415,0.0001270509,0.00034610333,0.00012715804],"domain_scores_gemma":[0.9984414,0.0008639515,0.0001673922,0.00010025573,0.00032673375,0.00010037074],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015954829,0.00060405815,0.0006205409,0.0015033109,0.0007562858,0.004805883,0.001187631,0.0016193542,0.002074381],"category_scores_gemma":[0.0019542472,0.0003097216,0.00053431303,0.0019444645,0.0024572741,0.0030929924,0.001824183,0.0018272924,0.00043119065],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009012089,0.00007752568,0.0019745072,0.00032597847,0.00008297398,0.00021106447,0.0004421661,0.111535795,0.000948404,0.8351933,0.004195308,0.04500387],"study_design_scores_gemma":[0.000010695908,0.00014698623,0.0017765315,0.00040437852,0.000041429725,0.0002040573,0.0014537795,0.19339508,0.00073998846,0.71373796,0.08804296,0.000046169742],"about_ca_topic_score_codex":0.005009804,"about_ca_topic_score_gemma":0.0031146707,"teacher_disagreement_score":0.005009804,"about_ca_system_score_codex":0.0021673876,"about_ca_system_score_gemma":0.002763465,"threshold_uncertainty_score":0.015725553},"labels":[],"label_agreement":null},{"id":"W4205251384","doi":"10.1007/s40030-021-00597-y","title":"Identification of Reasons for Contractor Insolvency in the Indian Construction Industry","year":2022,"lang":"en","type":"article","venue":"Journal of The Institution of Engineers (India) Series A","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lambton College","funders":"","keywords":"Insolvency; Viewpoints; Business; Going concern; Actuarial science; Identification (biology); Cash flow; Operations management; Risk management; Finance; Accounting; Audit; Economics","score_opus":0.0320250486251854,"score_gpt":0.3030921523982699,"score_spread":0.2710671037730845,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4205251384","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9959341,0.00014339,0.00011539612,0.00051153643,0.000005340312,0.000026676184,0.000113614005,0.0000035621808,0.0031462968],"genre_scores_gemma":[0.9994543,0.00005540362,0.000058806003,0.000023444116,0.000006369864,0.0000066638054,0.00006804748,0.0000016135609,0.0003253964],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99614245,0.0011448411,0.0004085032,0.00018365314,0.0011074466,0.0010131128],"domain_scores_gemma":[0.94462264,0.028056962,0.017341478,0.0012462763,0.0049523883,0.0037802071],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036911233,0.0002006304,0.00027991566,0.005218378,0.0017908904,0.0027606755,0.0014139896,0.0010898614,0.004663354],"category_scores_gemma":[0.02623282,0.0003418703,0.0006950658,0.0046255626,0.0013409761,0.000694285,0.0015696334,0.0018478753,0.0002864436],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009335853,0.000097206284,0.9902952,0.00002149422,0.00002155749,0.00029828638,0.002222736,0.00025423506,0.00011933908,0.0008645896,0.00041010548,0.0053020194],"study_design_scores_gemma":[0.0000024072783,0.00003097583,0.9825754,0.000026323714,0.000015307614,0.00021769592,0.015105301,0.0010237009,0.00008433234,0.00021221764,0.0006968997,0.0000093880335],"about_ca_topic_score_codex":0.053740073,"about_ca_topic_score_gemma":0.07540213,"teacher_disagreement_score":0.053740073,"about_ca_system_score_codex":0.0029371683,"about_ca_system_score_gemma":0.006738217,"threshold_uncertainty_score":0.10685456},"labels":[],"label_agreement":null},{"id":"W4206597569","doi":"10.54784/1990-6587.1328","title":"Role of Project Manager in design management","year":2009,"lang":"en","type":"article","venue":"Business Review","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SAIT Polytechnic","funders":"","keywords":"Project manager; Project management triangle; Project charter; Functional manager; Project management; Extreme project management; Project stakeholder; Project planning; Project team; Work breakdown structure; Engineering management; OPM3; Program management; Process management; Constructability; Project management 2.0; Project sponsorship; Knowledge management; Project risk management; Software project management; Engineering; Computer science; Systems engineering; Software development","score_opus":0.11986699082172726,"score_gpt":0.3917382614123922,"score_spread":0.27187127059066496,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206597569","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06000835,0.09659308,0.27472433,0.15139662,0.017241599,0.0028813076,0.00045837575,0.003330197,0.39336622],"genre_scores_gemma":[0.53429335,0.06256009,0.12491412,0.02863856,0.0076892823,0.002591716,0.00064978667,0.00071541354,0.23794758],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.97856766,0.012335935,0.0016011555,0.001087051,0.005397457,0.0010106945],"domain_scores_gemma":[0.9751722,0.007265253,0.0021930996,0.0009934789,0.010001244,0.0043746857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.018406458,0.00052057655,0.00058087095,0.0021233864,0.0026170039,0.0048846616,0.0015095256,0.0015504615,0.01568511],"category_scores_gemma":[0.023558477,0.00047263695,0.00024205091,0.0020905163,0.0011477825,0.0036707262,0.0022138814,0.0029977546,0.0060068886],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015664777,0.0003144712,0.0063604433,0.0017095392,0.000062397885,0.0015348285,0.008826282,0.0009766055,0.0032322535,0.054859377,0.2505726,0.6713946],"study_design_scores_gemma":[0.00004870595,0.00035493795,0.0038869877,0.0007262265,0.000031881398,0.0015838686,0.0040288456,0.000875178,0.0014310691,0.00617776,0.9807978,0.000056734014],"about_ca_topic_score_codex":0.0013587388,"about_ca_topic_score_gemma":0.0011773002,"teacher_disagreement_score":0.018406458,"about_ca_system_score_codex":0.0024767772,"about_ca_system_score_gemma":0.008965829,"threshold_uncertainty_score":0.09734386},"labels":[],"label_agreement":null},{"id":"W4206751491","doi":"10.1049/me:20010511","title":"The essentials of project management","year":2001,"lang":"en","type":"article","venue":"Manufacturing Engineer","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Government of Ontario","keywords":"Project management; Engineering; Systems engineering; Process management; Computer science; Engineering management; Construction engineering","score_opus":0.05446471035254342,"score_gpt":0.3379093327873864,"score_spread":0.283444622434843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206751491","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030632622,0.022957401,0.07035593,0.067222185,0.003729615,0.00026642845,0.00022977007,0.00050142437,0.83167404],"genre_scores_gemma":[0.12459747,0.050603345,0.09767307,0.014664129,0.0042824363,0.0007674497,0.00044124824,0.0005681501,0.7064027],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99567956,0.0013300537,0.00026975284,0.00030488512,0.0020863907,0.00032935425],"domain_scores_gemma":[0.9956761,0.001962941,0.00028060193,0.0005478511,0.00089878467,0.000633803],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002798178,0.000552688,0.00038537357,0.0007256393,0.0029040084,0.009607759,0.0008857002,0.0017584555,0.013020295],"category_scores_gemma":[0.007828212,0.0006043988,0.00032993185,0.0011320555,0.005032951,0.0055469126,0.0029190497,0.0049153264,0.009497199],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008452584,0.000039725517,0.0003511197,0.00027197556,0.0000061760625,0.0001573667,0.0048338696,0.000746341,0.00033995227,0.5517658,0.23838575,0.20309356],"study_design_scores_gemma":[0.000002422972,0.000014840154,0.0003588584,0.0003003845,0.0000013277362,0.00014754714,0.00059939123,0.00020500194,0.00007401617,0.09850741,0.8997805,0.000008223948],"about_ca_topic_score_codex":0.002534511,"about_ca_topic_score_gemma":0.0029284398,"teacher_disagreement_score":0.013020295,"about_ca_system_score_codex":0.00230237,"about_ca_system_score_gemma":0.00548852,"threshold_uncertainty_score":0.043557286},"labels":[],"label_agreement":null},{"id":"W4206930088","doi":"10.5267/j.ijdns.2021.11.007","title":"The effect of social media on investment capital development of transportation infrastructure","year":2022,"lang":"en","type":"article","venue":"International Journal of Data and Network Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Vietnamese; Investment (military); Business; Social media; Social capital; Marketing; Capital (architecture); Politics","score_opus":0.039190803919037245,"score_gpt":0.3503891005367868,"score_spread":0.31119829661774956,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206930088","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9891818,0.00012804734,0.00015113657,0.00029951197,0.0000064740807,0.000023700497,0.00005990816,0.0000047775407,0.010144683],"genre_scores_gemma":[0.99925214,0.00006730237,0.00007310669,0.000012223356,0.0000044037583,0.0000043591826,0.000019108196,8.077269e-7,0.000566506],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99931943,0.00026396182,0.000029949886,0.00004761735,0.00014046638,0.00019865972],"domain_scores_gemma":[0.9924878,0.0032417756,0.0019744025,0.00016019365,0.0007727496,0.0013631077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006056184,0.00019181243,0.000092620874,0.000972134,0.00040822034,0.001471439,0.00018524217,0.00022507379,0.004046094],"category_scores_gemma":[0.004909434,0.00009360548,0.00016871227,0.0005961123,0.00046766025,0.00078511774,0.0007401074,0.00035301564,0.000218514],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016349398,0.00049523124,0.9521164,0.00008001215,0.00007682455,0.0006021144,0.0018116785,0.000640908,0.0011146998,0.0015149338,0.00061783416,0.040765963],"study_design_scores_gemma":[0.0000063842863,0.00014904005,0.98984385,0.000044936864,0.00003972205,0.00010804732,0.004668584,0.00188474,0.000600167,0.00027460043,0.0023711554,0.000008748758],"about_ca_topic_score_codex":0.008424864,"about_ca_topic_score_gemma":0.01253523,"teacher_disagreement_score":0.008424864,"about_ca_system_score_codex":0.0013293087,"about_ca_system_score_gemma":0.0012345485,"threshold_uncertainty_score":0.016751707},"labels":[],"label_agreement":null},{"id":"W4210369283","doi":"10.1088/1757-899x/1218/1/012039","title":"The Next Era of IPD Research: A Systematic Literature Review of The IPD Research Trends 2017-2020","year":2022,"lang":"en","type":"article","venue":"IOP Conference Series Materials Science and Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Systematic review; Fragmentation (computing); Management science; Data science; Engineering ethics; Computer science; Political science; MEDLINE; Engineering","score_opus":0.2016976415671795,"score_gpt":0.3978294430556714,"score_spread":0.1961318014884919,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210369283","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0041066646,0.9903886,0.0006353867,0.0022909178,0.0003202368,0.00053994707,0.0008522177,0.000012678517,0.0008533095],"genre_scores_gemma":[0.025759961,0.9677193,0.0029314323,0.00141918,0.00013468406,0.0011183408,0.000729296,0.000013668511,0.00017414909],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.972455,0.009778105,0.009865502,0.0016873963,0.005354606,0.0008593346],"domain_scores_gemma":[0.8756904,0.08769855,0.015409099,0.0021865112,0.017425872,0.001589606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.04102613,0.0011050749,0.004136079,0.03382818,0.0012685619,0.005602729,0.0018891231,0.0020913172,0.0032022428],"category_scores_gemma":[0.10101787,0.001315042,0.0042728046,0.032024864,0.0019127222,0.007817908,0.0036410969,0.0022458513,0.00048775435],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001489663,0.000045682405,0.0030860044,0.8361196,0.0016036951,0.0003217379,0.003535865,0.00021652608,0.0005116687,0.0026757198,0.0057103285,0.14602421],"study_design_scores_gemma":[0.000036633668,0.00009526504,0.0048110303,0.942088,0.003700746,0.0003090398,0.004265118,0.00010178542,0.00020093867,0.0006907409,0.043663654,0.000037032703],"about_ca_topic_score_codex":0.011678262,"about_ca_topic_score_gemma":0.039781313,"teacher_disagreement_score":0.04102613,"about_ca_system_score_codex":0.009412176,"about_ca_system_score_gemma":0.048841625,"threshold_uncertainty_score":0.21696949},"labels":[],"label_agreement":null},{"id":"W4211049278","doi":"10.1002/9781119208587.refs","title":"References","year":2012,"lang":"en","type":"other","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"International Development Research Centre","keywords":"Risk management; Citation; Management; Operations research; Library science; Actuarial science; Business; Political science; Law; Economics; Engineering; Computer science","score_opus":0.22697065875217262,"score_gpt":0.42023435286165006,"score_spread":0.19326369410947744,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4211049278","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005720449,0.27345705,0.002623514,0.02987518,0.030613553,0.0001906312,0.007919028,0.00065968337,0.6540893],"genre_scores_gemma":[0.006841209,0.20055854,0.0027969952,0.014233285,0.0073779225,0.00020539663,0.009875468,0.00047145694,0.7576397],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984225,0.00022203314,0.00013657335,0.00026988756,0.0007970163,0.00015209625],"domain_scores_gemma":[0.99718493,0.00050471915,0.0001594056,0.00029891546,0.0015661623,0.00028587115],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0012204127,0.0010685577,0.0010963962,0.0060933386,0.0020029547,0.0055638165,0.0027287302,0.003221714,0.37981573],"category_scores_gemma":[0.0062920544,0.0004172207,0.001054017,0.007516224,0.000977046,0.005083919,0.0025299378,0.0028414973,0.21386176],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016975813,0.000018434856,0.00012454945,0.00055012153,0.0000048591037,0.000077538265,0.000106225394,0.000052872667,0.00008819783,0.010427771,0.88627696,0.10225558],"study_design_scores_gemma":[0.0000013295219,0.0000023280668,0.00010910587,0.0002870407,0.0000020934276,0.00006843101,0.00004953362,0.000009703129,0.000021159409,0.0009655604,0.9984811,0.0000025231695],"about_ca_topic_score_codex":0.016055137,"about_ca_topic_score_gemma":0.020138383,"teacher_disagreement_score":0.6201843,"about_ca_system_score_codex":0.0045182435,"about_ca_system_score_gemma":0.0069566607,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4213274870","doi":"10.1108/jbs-11-2021-0190","title":"Bias versus error: why projects fall short","year":2022,"lang":"en","type":"article","venue":"Journal of Business Strategy","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Debiasing; Originality; Stakeholder; Value (mathematics); Optimism bias; Battle; Business case; Creativity; Public relations; Political science; Business; Economics; Computer science; Psychology; Management; Optimism; Law; Social psychology","score_opus":0.3358847705534463,"score_gpt":0.39168245485418685,"score_spread":0.05579768430074056,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4213274870","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2430741,0.029336035,0.10800009,0.47073892,0.0070811985,0.0008845874,0.0009128483,0.0011727912,0.13879946],"genre_scores_gemma":[0.94140005,0.004769804,0.0142133925,0.026829544,0.0014704878,0.0006259809,0.00020959556,0.000800399,0.009680728],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.7678481,0.123188175,0.013288439,0.010841499,0.07682501,0.00800882],"domain_scores_gemma":[0.4833793,0.35936886,0.058397308,0.02581846,0.056787845,0.016248269],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.15995656,0.0007261944,0.00093707215,0.005193338,0.00548359,0.014489553,0.0031450223,0.004115509,0.00808895],"category_scores_gemma":[0.46239462,0.0007213304,0.0006428319,0.0066887503,0.018771805,0.016182764,0.00840571,0.005056569,0.0026959584],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00053499255,0.00017091319,0.0937445,0.002573208,0.00027442264,0.001234435,0.053311743,0.002744039,0.00080588175,0.326349,0.1541325,0.36412436],"study_design_scores_gemma":[0.00016383328,0.0005816651,0.049926557,0.008231973,0.00015377405,0.0013822677,0.08020622,0.004728593,0.0018063344,0.4237208,0.42879322,0.0003047518],"about_ca_topic_score_codex":0.008605946,"about_ca_topic_score_gemma":0.006449801,"teacher_disagreement_score":0.15995656,"about_ca_system_score_codex":0.01067665,"about_ca_system_score_gemma":0.020711381,"threshold_uncertainty_score":0.84594125},"labels":[],"label_agreement":null},{"id":"W4213408059","doi":"","title":"The rigor-relevance gap in Project Management research: It's time to stop the lament and think and act reflexively","year":2022,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa; Université du Québec en Outaouais","funders":"","keywords":"Lament; Relevance (law); Rigour; Psychology; Epistemology; Computer science; Political science; Philosophy; Art; Literature; Law","score_opus":0.12206069960157404,"score_gpt":0.3830850861814283,"score_spread":0.2610243865798543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4213408059","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":"methods","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":"methods","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016951501,0.04224488,0.13328488,0.7772697,0.004470547,0.00028868878,0.00007835779,0.0003021073,0.0251094],"genre_scores_gemma":[0.7611067,0.02915987,0.12675114,0.06727914,0.006846919,0.0019918452,0.00014735818,0.0007310425,0.005985988],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.5618119,0.34961614,0.0158933,0.017414903,0.051215995,0.0040477486],"domain_scores_gemma":[0.32871443,0.5755289,0.023814382,0.042116713,0.022667043,0.0071584336],"candidate_categories":["metaresearch"],"consensus_categories":["metaresearch"],"category_scores_codex":[0.39664078,0.0012938239,0.003416982,0.0073275114,0.010865608,0.0433862,0.0065383175,0.016306875,0.003177935],"category_scores_gemma":[0.408139,0.0015150381,0.0015166273,0.00696403,0.13364881,0.057577856,0.021848934,0.024366362,0.0018390495],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013758113,0.00014312805,0.0020143015,0.0025353294,0.00015473177,0.0002576843,0.08412203,0.0008801921,0.0007581077,0.8192672,0.012450311,0.07727934],"study_design_scores_gemma":[0.00006253977,0.00011426323,0.0006337617,0.0028178259,0.00003532133,0.00016335813,0.01881744,0.00069801236,0.0005033906,0.92579377,0.050270796,0.00008961024],"about_ca_topic_score_codex":0.0024695834,"about_ca_topic_score_gemma":0.0019282197,"teacher_disagreement_score":0.6033592,"about_ca_system_score_codex":0.013277286,"about_ca_system_score_gemma":0.041775618,"threshold_uncertainty_score":0.7440493},"labels":[],"label_agreement":null},{"id":"W4214569113","doi":"10.5539/ibr.v15n3p85","title":"A Multi-Criteria Model to Evaluate Public Services Contracts","year":2022,"lang":"en","type":"article","venue":"International Business Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Fundação para a Ciência e a Tecnologia","keywords":"Process (computing); Contract management; Identification (biology); Key (lock); Process management; Computer science; Business; Public sector; Risk analysis (engineering); Environmental economics; Economics; Computer security; Marketing","score_opus":0.4469342728308902,"score_gpt":0.5380981766897598,"score_spread":0.09116390385886958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4214569113","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07719135,0.0010530691,0.88265884,0.0014787356,0.00019257942,0.00063782086,0.00059797906,0.00022234097,0.035967212],"genre_scores_gemma":[0.8908756,0.00074284733,0.095836066,0.00012546068,0.00007583306,0.0010376015,0.00033196248,0.00004251813,0.010932075],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9954053,0.0029190811,0.00017863975,0.00037017782,0.000647172,0.0004796908],"domain_scores_gemma":[0.99570423,0.0029195345,0.00030260335,0.00009676498,0.00070900016,0.00026798822],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006498196,0.0017319369,0.0014749265,0.0023582433,0.0011702006,0.0041975295,0.002830245,0.003449651,0.00623138],"category_scores_gemma":[0.008690122,0.0006418634,0.001738275,0.0026752164,0.0012796152,0.0020361934,0.0017875053,0.0023202223,0.0005740287],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036932255,0.000054320764,0.00037143123,0.000046846326,0.000041693445,0.00009013338,0.000071610746,0.97280633,0.00015505464,0.02173958,0.00037561232,0.004210568],"study_design_scores_gemma":[0.000015440288,0.000052869298,0.000112923444,0.00001565206,0.000013268511,0.000011316682,0.000038283764,0.99264294,0.000046423753,0.0065654246,0.0004744281,0.0000110635165],"about_ca_topic_score_codex":0.021465298,"about_ca_topic_score_gemma":0.010214873,"teacher_disagreement_score":0.021465298,"about_ca_system_score_codex":0.0057323226,"about_ca_system_score_gemma":0.0039162203,"threshold_uncertainty_score":0.04268074},"labels":[],"label_agreement":null},{"id":"W4220658654","doi":"10.1016/j.asej.2022.101773","title":"A systematic review of current status and trends of mega-infrastructure projects","year":2022,"lang":"en","type":"review","venue":"Ain Shams Engineering Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Fundamental Research Funds for the Central Universities; Natural Science Foundation of Chongqing; Chongqing University","keywords":"Mega-; Current (fluid); Megacity; Regional science; Environmental planning; Business; Geography; Engineering; Economics; Economy; Physics","score_opus":0.08724341546072671,"score_gpt":0.38651089610592654,"score_spread":0.2992674806451998,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220658654","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012065886,0.996407,0.0002464419,0.00054518896,0.000118326905,0.00017975751,0.0006934574,0.000008470241,0.00059486565],"genre_scores_gemma":[0.007728789,0.99075085,0.0005966589,0.00021591168,0.000049629194,0.00022174403,0.00031920208,0.0000033502183,0.00011398936],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.98931,0.0029400962,0.0039634523,0.0007505933,0.0027765667,0.0002593217],"domain_scores_gemma":[0.9574726,0.028211117,0.00695193,0.00068830047,0.006105424,0.0005706557],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010524199,0.0012119879,0.00392663,0.029219396,0.0008119359,0.0029240656,0.0016164082,0.0013698479,0.0041216286],"category_scores_gemma":[0.045083955,0.0008473937,0.003985523,0.032252926,0.00079679105,0.0032956193,0.0014937224,0.0010033365,0.00044573628],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009248257,0.000026017808,0.0017508675,0.84472996,0.0027581223,0.00018699426,0.00047421234,0.00015244818,0.00024856988,0.0008597615,0.005007392,0.14371309],"study_design_scores_gemma":[0.00005954103,0.00015405593,0.009589875,0.87492204,0.018925494,0.0006492765,0.00084182876,0.00012410777,0.00029481624,0.00071199297,0.093681134,0.00004576939],"about_ca_topic_score_codex":0.008886613,"about_ca_topic_score_gemma":0.031835236,"teacher_disagreement_score":0.029219396,"about_ca_system_score_codex":0.0037937707,"about_ca_system_score_gemma":0.022737032,"threshold_uncertainty_score":0.055657923},"labels":[],"label_agreement":null},{"id":"W4220728838","doi":"10.1061/9780784483978.094","title":"Are Different Innovations More Challenging to Implement? A Comparison of Different Types of Changes in the AEC","year":2022,"lang":"en","type":"article","venue":"Construction Research Congress 2022","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Procurement; Process (computing); Business; Minor (academic); Process management; Computer science; Operations management; Industrial organization; Marketing; Engineering","score_opus":0.2940580434122755,"score_gpt":0.4962669163622565,"score_spread":0.20220887294998102,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220728838","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9934702,0.00053477025,0.00035050375,0.00069257925,0.000021667129,0.000064808795,0.000027456248,0.000006217009,0.0048318254],"genre_scores_gemma":[0.99842405,0.0005251877,0.00035507858,0.00020669878,0.000027379077,0.000037549024,0.00005081701,0.000008780387,0.00036457402],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9807438,0.0055768574,0.0019427717,0.0010931395,0.007917866,0.002725521],"domain_scores_gemma":[0.9342225,0.032109387,0.020177674,0.0025488464,0.006699152,0.0042425143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011299916,0.00031202656,0.00048520343,0.0044580917,0.0014794342,0.004858432,0.0011456677,0.002394666,0.002240091],"category_scores_gemma":[0.074301295,0.0004329541,0.0012805125,0.003238194,0.0026208898,0.0072753406,0.0031583912,0.0018841899,0.00042346935],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025002725,0.00073552446,0.85394263,0.00036032297,0.00020727038,0.0009510336,0.041683078,0.00045682405,0.0012415148,0.0027138507,0.0009621946,0.09649579],"study_design_scores_gemma":[0.000016890535,0.00037792054,0.95464176,0.00014679923,0.000051255043,0.00075034506,0.039657857,0.0004961964,0.00027645528,0.0005256438,0.0030283742,0.000030421117],"about_ca_topic_score_codex":0.0032914928,"about_ca_topic_score_gemma":0.005755693,"teacher_disagreement_score":0.011299916,"about_ca_system_score_codex":0.0018642063,"about_ca_system_score_gemma":0.002282889,"threshold_uncertainty_score":0.05976039},"labels":[],"label_agreement":null},{"id":"W4220767401","doi":"10.1016/j.ijproman.2022.03.005","title":"Project, program and portfolio management as modes of organizing: Theorising at the intersection between mergers and acquisitions and project studies","year":2022,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Project portfolio management; Portfolio; Project sponsorship; Position (finance); Bridge (graph theory); Project management; Intersection (aeronautics); Mergers and acquisitions; Project management triangle; Project charter; Business; Process management; Management science; Engineering management; Engineering; Management; Economics; Finance; Transport engineering","score_opus":0.1091294364282034,"score_gpt":0.4479962925874523,"score_spread":0.33886685615924894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220767401","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24453293,0.009333384,0.33316365,0.023874711,0.0002234769,0.0003523596,0.00008004989,0.000082136234,0.3883573],"genre_scores_gemma":[0.95820004,0.0036061385,0.029370137,0.0003238014,0.0000939939,0.00030245862,0.000027307833,0.000031709526,0.008044495],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99146265,0.0070066927,0.00017670196,0.00031555703,0.00067611,0.00036236836],"domain_scores_gemma":[0.9891566,0.0073644267,0.0011233476,0.00097067724,0.0005201345,0.00086472416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0075453487,0.00042092334,0.00032477657,0.003225549,0.0024906858,0.009685055,0.001484164,0.0021419046,0.0046385536],"category_scores_gemma":[0.009342297,0.00039321798,0.00041170756,0.0045271465,0.021723991,0.013778768,0.004691509,0.0017920536,0.00034880024],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000764288,0.00002789553,0.0010685896,0.000055212036,0.0000042481947,0.000059650527,0.007537866,0.0007948494,0.000064867156,0.9789533,0.00033691333,0.011089021],"study_design_scores_gemma":[0.000016901273,0.00007695362,0.0022224106,0.00029112317,0.00000831172,0.00020704744,0.02062614,0.0051967725,0.00022989383,0.92367965,0.0474281,0.000016751463],"about_ca_topic_score_codex":0.0012972103,"about_ca_topic_score_gemma":0.0013838176,"teacher_disagreement_score":0.009685055,"about_ca_system_score_codex":0.0025747202,"about_ca_system_score_gemma":0.003036537,"threshold_uncertainty_score":0.039904118},"labels":[],"label_agreement":null},{"id":"W4221015383","doi":"10.1061/9780784483978.076","title":"Identifying Multilevel Metrics for Construction Competency and Performance Measures","year":2022,"lang":"en","type":"article","venue":"Construction Research Congress 2022","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Multilevel model; Knowledge management; Construction industry; Profitability index; Computer science; Performance measurement; Engineering; Business; Marketing","score_opus":0.3167108441618492,"score_gpt":0.4543778396191806,"score_spread":0.1376669954573314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4221015383","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25385866,0.0014044328,0.6874327,0.0015583088,0.00012867228,0.0028349513,0.0059329523,0.00095489004,0.04589447],"genre_scores_gemma":[0.58850133,0.0005266416,0.40151912,0.00010497744,0.000035637226,0.0035874115,0.0039550555,0.00010936349,0.001660442],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.981614,0.006779268,0.0021120408,0.0012980772,0.007333545,0.0008631404],"domain_scores_gemma":[0.9224389,0.035992566,0.014536863,0.0056806556,0.019819167,0.0015319564],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01823075,0.0008559561,0.00087592244,0.011976408,0.0012661121,0.0044464055,0.0013380565,0.0011122779,0.0034088192],"category_scores_gemma":[0.083701104,0.000342401,0.0011829269,0.012332807,0.0011515438,0.004425532,0.0046026483,0.0020381196,0.0007649565],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019403818,0.000727177,0.38349235,0.0016705296,0.00049657054,0.00016841487,0.0050834976,0.032840908,0.0050572213,0.09245678,0.009129214,0.4686833],"study_design_scores_gemma":[0.000064258325,0.0020473404,0.6300609,0.002311617,0.00033184933,0.00031654973,0.012056303,0.21111219,0.010328596,0.08614645,0.044902302,0.00032161994],"about_ca_topic_score_codex":0.0066971383,"about_ca_topic_score_gemma":0.012385096,"teacher_disagreement_score":0.01823075,"about_ca_system_score_codex":0.0045616166,"about_ca_system_score_gemma":0.0047298595,"threshold_uncertainty_score":0.096414566},"labels":[],"label_agreement":null},{"id":"W4221057338","doi":"10.12821/ijispm090401","title":"Risk and vulnerability management, project agility and resilience: a comparative analysis","year":2022,"lang":"en","type":"article","venue":"International journal of information systems and project management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Vulnerability (computing); Resilience (materials science); Process management; Risk management; Project management; Extreme project management; Project management triangle; Knowledge management; Risk analysis (engineering); Exploit; Computer science; Conceptual framework; OPM3; Management science; Business; Engineering; Systems engineering; Sociology; Computer security","score_opus":0.05163142071600029,"score_gpt":0.38096069835774066,"score_spread":0.32932927764174036,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4221057338","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49754414,0.32740092,0.021446103,0.009659391,0.00030049187,0.00034201262,0.0004462592,0.000043670865,0.14281707],"genre_scores_gemma":[0.91265684,0.080406874,0.0049492656,0.0001897592,0.000113490896,0.00015155262,0.00011274406,0.000010150952,0.0014093244],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99618405,0.002206084,0.00028157362,0.00016059104,0.00091722095,0.00025049195],"domain_scores_gemma":[0.9837795,0.012261443,0.0013894347,0.000171485,0.0021249685,0.00027316622],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00470304,0.000416052,0.00056775654,0.012835526,0.0009760007,0.0033874258,0.00045007071,0.0008658923,0.0040191994],"category_scores_gemma":[0.012879475,0.00018324633,0.0006194991,0.012365922,0.0015945755,0.0048527406,0.0019987996,0.0006416848,0.00018232194],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042480676,0.00028344092,0.06941996,0.014232359,0.000777586,0.0019004531,0.035817437,0.005866721,0.0010333674,0.3199932,0.006624541,0.5436262],"study_design_scores_gemma":[0.00006144551,0.0017529834,0.35113227,0.028784445,0.0018465115,0.0044162134,0.25759557,0.012712524,0.0022644806,0.11746248,0.22175136,0.00021980597],"about_ca_topic_score_codex":0.0025446524,"about_ca_topic_score_gemma":0.0031669708,"teacher_disagreement_score":0.012835526,"about_ca_system_score_codex":0.0037005416,"about_ca_system_score_gemma":0.0031116032,"threshold_uncertainty_score":0.02684939},"labels":[],"label_agreement":null},{"id":"W4223541757","doi":"10.1108/bij-08-2021-0483","title":"A fuzzy-based competitiveness assessment tool for construction SMEs","year":2022,"lang":"en","type":"article","venue":"Benchmarking An International Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Call for bids; Procurement; Business; Industrial organization; Strengths and weaknesses; Market share; Process (computing); Resource (disambiguation); Marketing; Process management; Operations management; Computer science; Economics","score_opus":0.06744955851909923,"score_gpt":0.4053603520154936,"score_spread":0.33791079349639436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4223541757","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5375793,0.00043600635,0.39613572,0.0010995755,0.00010251765,0.0032973394,0.0052713603,0.0025030505,0.053575058],"genre_scores_gemma":[0.6566952,0.00014704607,0.33830625,0.00009806775,0.000015374486,0.0015797158,0.0016365651,0.00003479767,0.0014870338],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9979102,0.00072696526,0.00027846213,0.0001538273,0.0008146875,0.00011581722],"domain_scores_gemma":[0.9912708,0.0056751026,0.0008102638,0.00022096446,0.0018004101,0.0002224216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003687138,0.0006647497,0.00044056866,0.009436655,0.00078240206,0.0023350471,0.0007128209,0.0006541462,0.0062308987],"category_scores_gemma":[0.016625477,0.00020265375,0.0009959484,0.0043631443,0.00056769676,0.0020462887,0.0013361431,0.0006043375,0.0006772146],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013153292,0.0010015381,0.06183279,0.0030102902,0.00025597765,0.0012219734,0.011988025,0.027667783,0.029327212,0.03837873,0.0103493,0.813651],"study_design_scores_gemma":[0.00045406626,0.0031605673,0.21759227,0.0031835977,0.0006526026,0.0028947745,0.06599715,0.50995386,0.036325086,0.08108222,0.07791082,0.000793006],"about_ca_topic_score_codex":0.0024381948,"about_ca_topic_score_gemma":0.0032741402,"teacher_disagreement_score":0.009436655,"about_ca_system_score_codex":0.0015781636,"about_ca_system_score_gemma":0.0013867544,"threshold_uncertainty_score":0.0208444},"labels":[],"label_agreement":null},{"id":"W4224252821","doi":"10.1016/j.dibe.2022.100074","title":"Error aversion or management? Exploring the impact of culture at the sharp-end of production in a mega-project","year":2022,"lang":"en","type":"article","venue":"Developments in the Built Environment","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Wilfrid Laurier University; University of Ottawa","funders":"","keywords":"Rework; Workforce; Alliance; Production (economics); Rank (graph theory); Exploratory research; Business; Computer science; Operations management; Operations research; Marketing; Economics; Sociology; Microeconomics; Political science; Engineering; Mathematics; Economic growth; Social science","score_opus":0.1526784635251231,"score_gpt":0.35973179305169317,"score_spread":0.20705332952657007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224252821","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.997785,0.00005790629,0.00054519717,0.00019645234,0.000004889243,0.000009998073,0.00000437443,0.0000016553597,0.0013946735],"genre_scores_gemma":[0.999456,0.000050555514,0.00027105707,0.000041704578,0.0000029000803,0.0000098842565,0.0000039563147,0.0000014667263,0.00016246147],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9834538,0.011188598,0.00066300965,0.00079583394,0.0026849203,0.0012138919],"domain_scores_gemma":[0.9222887,0.04757152,0.018844832,0.0033595848,0.004318189,0.003617077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016595691,0.0003141003,0.00040526674,0.0012195737,0.0014403804,0.0051709013,0.0010164304,0.00065361714,0.0014099368],"category_scores_gemma":[0.05963603,0.00022791071,0.00032290161,0.001035186,0.0042407555,0.002354682,0.0041539394,0.0014972728,0.0001380116],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020168717,0.0006289098,0.8177565,0.00019276259,0.00014134562,0.00025343747,0.12669148,0.00075624936,0.0009726307,0.0033667244,0.0002794416,0.04875879],"study_design_scores_gemma":[0.000012096145,0.00077471614,0.6707594,0.00027548402,0.00006028954,0.00019184659,0.32121077,0.0016520137,0.00082306645,0.0017864001,0.0024010679,0.00005281273],"about_ca_topic_score_codex":0.0039097858,"about_ca_topic_score_gemma":0.005748175,"teacher_disagreement_score":0.016595691,"about_ca_system_score_codex":0.0018121128,"about_ca_system_score_gemma":0.0030514072,"threshold_uncertainty_score":0.08776748},"labels":[],"label_agreement":null},{"id":"W4225128910","doi":"10.11159/icsect22.156","title":"CEB as Potential Alternative Sustainable Material in Construction Industry: Survey on the Level of Acceptance in Kuwait","year":2022,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Construction industry; Construction engineering; Business; Engineering; Manufacturing engineering; Architectural engineering","score_opus":0.03439612004647943,"score_gpt":0.2633256471739487,"score_spread":0.22892952712746925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4225128910","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99942374,0.000020442938,0.000025925681,0.000033736545,0.0000011228325,0.000011861403,0.000028900462,7.897673e-7,0.00045358538],"genre_scores_gemma":[0.99880886,0.000111733854,0.000109021224,0.00005647102,0.0000027351089,0.000026008658,0.00005957371,0.0000013820018,0.0008241858],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9989843,0.00025108468,0.000113114904,0.00006244631,0.00032299894,0.0002660185],"domain_scores_gemma":[0.9983463,0.00030135515,0.00064798316,0.000046652163,0.00037200152,0.000285653],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012762583,0.0002698329,0.00027195955,0.00093590375,0.0008636276,0.00097491744,0.0003236225,0.00062956475,0.0023562529],"category_scores_gemma":[0.001880575,0.0003258388,0.00034493685,0.0010514706,0.0006418347,0.0004798629,0.0005997576,0.000745388,0.0005354129],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009180155,0.0005830756,0.96901053,0.0000952877,0.000027331853,0.00052016485,0.016135523,0.000118579985,0.004664347,0.00014587285,0.00025375618,0.008353703],"study_design_scores_gemma":[0.0000030187794,0.00047396327,0.97001386,0.000034611025,0.000013170368,0.00028848668,0.027043693,0.00040715668,0.00049213436,0.000019888348,0.0011929615,0.00001702603],"about_ca_topic_score_codex":0.0152475685,"about_ca_topic_score_gemma":0.016618703,"teacher_disagreement_score":0.0152475685,"about_ca_system_score_codex":0.00078196306,"about_ca_system_score_gemma":0.0006081988,"threshold_uncertainty_score":0.030317664},"labels":[],"label_agreement":null},{"id":"W4225666461","doi":"","title":"Risk and vulnerability management, project agility and resilience: a comparative analysis","year":2021,"lang":"en","type":"article","venue":"Journal of the Association for Information Systems","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Resilience (materials science); Vulnerability (computing); Environmental resource management; Vulnerability assessment; Risk management; Environmental planning; Risk analysis (engineering); Business; Environmental science; Psychology; Computer science; Computer security; Psychological resilience; Social psychology","score_opus":0.052186462251813344,"score_gpt":0.36940395932467673,"score_spread":0.3172174970728634,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4225666461","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50443894,0.32326987,0.021018386,0.01033427,0.00029995033,0.00033092935,0.00042408632,0.000041650845,0.13984187],"genre_scores_gemma":[0.9151287,0.07825217,0.0047493316,0.00019281848,0.00011176657,0.00014744002,0.000106102714,0.00000965349,0.0013019103],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9958519,0.0024291617,0.0003069432,0.00016740446,0.0009774963,0.0002670943],"domain_scores_gemma":[0.9824777,0.01331941,0.001480694,0.00018174172,0.0022531052,0.00028728237],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0050902176,0.00040785666,0.00055672025,0.013122402,0.0010208533,0.003422748,0.00045545094,0.00086779945,0.0039445264],"category_scores_gemma":[0.013881679,0.00018562355,0.00060861744,0.012741104,0.0016562854,0.005074319,0.0020775541,0.00065622333,0.00017613579],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042560024,0.00028384308,0.07333268,0.0138161825,0.0007756697,0.0018214851,0.03678583,0.005736876,0.0009933142,0.31973022,0.0066265133,0.53967184],"study_design_scores_gemma":[0.00006192286,0.0017289398,0.3546915,0.02764972,0.0017461613,0.0041929763,0.26585925,0.012145316,0.0021991653,0.114650115,0.21485807,0.00021693239],"about_ca_topic_score_codex":0.002637421,"about_ca_topic_score_gemma":0.0033916961,"teacher_disagreement_score":0.013122402,"about_ca_system_score_codex":0.0038899323,"about_ca_system_score_gemma":0.0032394303,"threshold_uncertainty_score":0.028223574},"labels":[],"label_agreement":null},{"id":"W4226391331","doi":"10.5267/j.jpm.2022.3.001","title":"Monte Carlo simulation in an elementary school building","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainability; Statistic; Monte Carlo method; Profitability index; Attendance; Environmental economics; Poverty; Investment (military); Business; Risk analysis (engineering); Actuarial science; Computer science; Economics; Economic growth; Finance; Political science; Mathematics","score_opus":0.10604274151492117,"score_gpt":0.4274384001939014,"score_spread":0.32139565867898023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226391331","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.265639,0.0011721104,0.66666585,0.0013218928,0.00018668274,0.00020463706,0.000512752,0.00047393597,0.06382312],"genre_scores_gemma":[0.9368805,0.0004946306,0.049831778,0.00012374122,0.000025946034,0.00020396324,0.00021874945,0.000044813325,0.012175864],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926573,0.00041804166,0.00002148659,0.00007942881,0.00011117354,0.00010416235],"domain_scores_gemma":[0.9966048,0.0027609833,0.00017094433,0.000111768866,0.00023799679,0.00011355994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012974291,0.00031728065,0.00064806495,0.0006018985,0.00054575683,0.0012998626,0.0006181473,0.0011855667,0.0061164876],"category_scores_gemma":[0.004772291,0.00038239814,0.00066374254,0.0007538261,0.0009859749,0.00070048944,0.00072604907,0.0010013522,0.00037102998],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003693891,0.000027323289,0.0010513653,0.000020845224,0.000016332933,0.000041176943,0.000038727965,0.9732146,0.00010739287,0.022387806,0.00031479145,0.002742683],"study_design_scores_gemma":[0.000009249891,0.000013244616,0.0002693852,0.000009002315,0.0000062867744,0.000009518572,0.000022289487,0.9891454,0.00007564009,0.00956808,0.00086626154,0.000005627104],"about_ca_topic_score_codex":0.02270064,"about_ca_topic_score_gemma":0.012832075,"teacher_disagreement_score":0.02270064,"about_ca_system_score_codex":0.0010115765,"about_ca_system_score_gemma":0.0015916115,"threshold_uncertainty_score":0.04513699},"labels":[],"label_agreement":null},{"id":"W4226414236","doi":"10.1007/978-3-030-97614-9_1","title":"Introduction to Asset Management for Infrastructure","year":2022,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; University of Toronto","funders":"","keywords":"Asset management; Business; Asset (computer security); Computer science; Finance; Computer security","score_opus":0.047641360380886524,"score_gpt":0.33203304001723144,"score_spread":0.28439167963634493,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226414236","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00060199905,0.03146642,0.027301086,0.0029709411,0.0019301759,0.000060930575,0.00042094273,0.00043962782,0.9348078],"genre_scores_gemma":[0.0050901165,0.021067234,0.009796066,0.00067877764,0.0006836644,0.000053478918,0.00026959772,0.00020745266,0.96215355],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998385,0.00001984361,0.0000069764387,0.000022116425,0.0000966037,0.000015841237],"domain_scores_gemma":[0.9998739,0.000052659598,0.000007213563,0.0000115340035,0.00004367204,0.000011044095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022548577,0.0009219755,0.00042840483,0.0013374004,0.00056578725,0.0019452892,0.0006512906,0.0009816716,0.073422216],"category_scores_gemma":[0.0004475462,0.0003337201,0.00029507666,0.0017632558,0.00062607665,0.002010414,0.000762655,0.0014839224,0.026351886],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006727189,0.00003882118,0.00010101139,0.00024198789,0.0000052816517,0.000080850965,0.00022549255,0.002803855,0.0005839791,0.18557148,0.49769822,0.31264222],"study_design_scores_gemma":[7.054857e-7,0.0000065563345,0.00015448262,0.00011216599,0.0000014015106,0.000051916417,0.000039182254,0.0004432297,0.00008173779,0.036183693,0.96292114,0.0000038877984],"about_ca_topic_score_codex":0.003636821,"about_ca_topic_score_gemma":0.009601305,"teacher_disagreement_score":0.073422216,"about_ca_system_score_codex":0.001283047,"about_ca_system_score_gemma":0.0010867816,"threshold_uncertainty_score":0.2456218},"labels":[],"label_agreement":null},{"id":"W4229074701","doi":"10.1002/sd.2327","title":"Renewable energy project success: Internal versus external stakeholders' satisfaction and influences of power‐interest matrix","year":2022,"lang":"en","type":"article","venue":"Sustainable Development","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Thompson Rivers University","funders":"","keywords":"Snowball sampling; Stakeholder; Renewable energy; Environmental economics; Business; Structural equation modeling; Stakeholder analysis; Corporate governance; Environmental resource management; Marketing; Public relations; Economics; Computer science; Finance; Engineering; Political science","score_opus":0.08791539302737311,"score_gpt":0.34429222925066755,"score_spread":0.25637683622329444,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4229074701","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99747425,0.000019990273,0.00036011348,0.000055553963,0.000003073972,0.000014938649,0.000028474024,0.0000038505495,0.0020397354],"genre_scores_gemma":[0.99973637,0.00001200903,0.00006831458,0.0000041626486,0.0000012854517,0.000008950793,0.000014789049,0.000001165523,0.00015293782],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9963038,0.0020768978,0.0002250414,0.00021435911,0.0007856147,0.00039421054],"domain_scores_gemma":[0.97647494,0.014107906,0.0048257755,0.00051459693,0.0017762334,0.0023006035],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029513976,0.00027042528,0.00030691916,0.0008521135,0.0005872345,0.002018325,0.00023894368,0.00028264106,0.0044500274],"category_scores_gemma":[0.01365315,0.00016706374,0.00047981038,0.0008256394,0.0007881491,0.0007031109,0.0014115968,0.0007452495,0.00029267246],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023069339,0.0004400701,0.96134233,0.000109961824,0.00011069772,0.0003362586,0.011780908,0.00068619294,0.0013682374,0.0008518754,0.0004466825,0.022296054],"study_design_scores_gemma":[0.0000067582855,0.00030888972,0.9668736,0.000048131988,0.000039009672,0.00016206388,0.028446365,0.0022506018,0.0006631957,0.0003390782,0.0008445151,0.000017796372],"about_ca_topic_score_codex":0.0014691099,"about_ca_topic_score_gemma":0.001712692,"teacher_disagreement_score":0.0044500274,"about_ca_system_score_codex":0.00052896066,"about_ca_system_score_gemma":0.00071566,"threshold_uncertainty_score":0.015608668},"labels":[],"label_agreement":null},{"id":"W4229565517","doi":"10.32920/14637564","title":"Adapting Engineering Design Tools to Include Human Factors","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Workplace Safety and Insurance Board","keywords":"Engineering design process; Process (computing); Engineering; Process management; Computer science; Mechanical engineering","score_opus":0.3710890002479594,"score_gpt":0.40909149010018264,"score_spread":0.038002489852223265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4229565517","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00868719,0.00027639035,0.95900506,0.0017489361,0.00038940783,0.0012120731,0.00023767559,0.0042275973,0.024215622],"genre_scores_gemma":[0.033469707,0.00032417107,0.95708907,0.0003853713,0.000060771385,0.0011431968,0.00033722364,0.0008403059,0.006350083],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97309995,0.01259283,0.0026560468,0.0020608658,0.0088851405,0.00070529274],"domain_scores_gemma":[0.90536815,0.04921477,0.0036769074,0.018456094,0.021829495,0.001454587],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.035329334,0.0023781587,0.0008273504,0.0062686014,0.0015358501,0.007830442,0.0035473309,0.0017367781,0.010277615],"category_scores_gemma":[0.09386983,0.0015641883,0.0020062537,0.0026877413,0.0023704874,0.0074561676,0.005308291,0.0035882879,0.0047726007],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020920069,0.0007567396,0.008070503,0.0020464624,0.0002115121,0.0007438725,0.014871047,0.03352798,0.013127789,0.11537705,0.028910417,0.78214735],"study_design_scores_gemma":[0.00028452108,0.0006831463,0.00475128,0.0028304085,0.0002756587,0.0007952209,0.006631474,0.055009488,0.020818235,0.12573771,0.7817574,0.00042549538],"about_ca_topic_score_codex":0.00241166,"about_ca_topic_score_gemma":0.004184755,"teacher_disagreement_score":0.035329334,"about_ca_system_score_codex":0.0032258418,"about_ca_system_score_gemma":0.007710398,"threshold_uncertainty_score":0.18684155},"labels":[],"label_agreement":null},{"id":"W4229672048","doi":"10.17722/ijme.v9i1.912","title":"Strategies to Implement the Baldrige Criteria for Performance Excellence","year":2017,"lang":"en","type":"article","venue":"International Journal of Management Excellence","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Excellence; Process management; Quality management system; Operational excellence; Accountability; Quality (philosophy); Business; Computer science; Knowledge management; Marketing; Quality management; Political science","score_opus":0.13977713801135924,"score_gpt":0.46477895773655004,"score_spread":0.3250018197251908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4229672048","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27532858,0.002985943,0.21639664,0.07852679,0.0011043719,0.008394831,0.00017074408,0.00095569494,0.41613647],"genre_scores_gemma":[0.8223364,0.0006629759,0.15185796,0.005590321,0.00010072966,0.0018374518,0.000120848956,0.00010566693,0.017387625],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9470914,0.02383318,0.0046834187,0.0026876905,0.017262748,0.004441667],"domain_scores_gemma":[0.9426761,0.016220178,0.007866046,0.004061655,0.022853315,0.0063226824],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.05240969,0.0007186226,0.0006356751,0.005043954,0.006034852,0.00830229,0.0021575226,0.0024746493,0.0032501842],"category_scores_gemma":[0.06723944,0.00033443034,0.00070837344,0.0026983363,0.0054819696,0.004954042,0.013102057,0.002752903,0.0010153077],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001101185,0.000781408,0.07049137,0.0010522212,0.000099173914,0.0010239139,0.05364643,0.0032532935,0.004069488,0.28884947,0.055119015,0.52150416],"study_design_scores_gemma":[0.00013855504,0.001673817,0.1012222,0.0027753352,0.00006919244,0.0016472668,0.08275437,0.007981224,0.007545809,0.1632061,0.63047034,0.00051572366],"about_ca_topic_score_codex":0.0056927907,"about_ca_topic_score_gemma":0.01131901,"teacher_disagreement_score":0.05240969,"about_ca_system_score_codex":0.008373933,"about_ca_system_score_gemma":0.024879217,"threshold_uncertainty_score":0.27717227},"labels":[],"label_agreement":null},{"id":"W4230239439","doi":"10.4324/9781315261133-1","title":"Introduction","year":2019,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Political science","score_opus":0.08230046256116397,"score_gpt":0.32984422586973927,"score_spread":0.2475437633085753,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230239439","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00092607946,0.013449939,0.006464029,0.006405281,0.007624169,0.0002286147,0.0030474402,0.0010575029,0.9607969],"genre_scores_gemma":[0.004173744,0.0102876285,0.0044990815,0.0030341416,0.0013661016,0.00015739372,0.0034732122,0.00041738965,0.9725912],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991749,0.00008847825,0.00004576754,0.00018245926,0.00041395842,0.00009451673],"domain_scores_gemma":[0.9993723,0.00013587195,0.000034849705,0.000056628625,0.0003067861,0.00009355297],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0004902591,0.00089518307,0.0006971688,0.0015731781,0.0016256006,0.004361997,0.0017911923,0.002309761,0.38772476],"category_scores_gemma":[0.0023618394,0.0003424658,0.0005624292,0.001623487,0.0008027588,0.003551002,0.0022981754,0.0020904955,0.23931207],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031330685,0.000046376448,0.00025967177,0.0004436159,0.0000044427543,0.00016922904,0.00059247407,0.00022238777,0.00048031082,0.05635247,0.77243215,0.16896549],"study_design_scores_gemma":[0.0000010061146,0.000006117792,0.00008956374,0.00010440778,6.685087e-7,0.000087323286,0.00007793597,0.000020295345,0.000038710506,0.0023565318,0.9972149,0.0000024616868],"about_ca_topic_score_codex":0.0024901195,"about_ca_topic_score_gemma":0.0030601781,"teacher_disagreement_score":0.61227524,"about_ca_system_score_codex":0.0015937195,"about_ca_system_score_gemma":0.0015035714,"threshold_uncertainty_score":0.8733363},"labels":[],"label_agreement":null},{"id":"W4230737018","doi":"10.1002/pmj.21570","title":"Simply, Pluralism!","year":2016,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Pluralism (philosophy); Epistemology; Sociology; Management science; Engineering ethics; Philosophy; Engineering","score_opus":0.10524197550796001,"score_gpt":0.3893712266909271,"score_spread":0.2841292511829671,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230737018","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008171566,0.013619912,0.030500758,0.5486562,0.02710834,0.000056812856,0.00015611167,0.0003343176,0.37139595],"genre_scores_gemma":[0.46899322,0.0075600254,0.017733501,0.20644198,0.027211886,0.0003453816,0.00021227429,0.0014735113,0.2700281],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.98473203,0.0071801264,0.0005485533,0.0023261544,0.003958579,0.00125456],"domain_scores_gemma":[0.9883471,0.003959487,0.000807996,0.00272191,0.0024162899,0.0017472133],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012708239,0.0008341554,0.0012412156,0.0018220172,0.011066929,0.016321514,0.0016831582,0.0054178988,0.017516613],"category_scores_gemma":[0.031628624,0.00059052464,0.00071937393,0.0015238198,0.044237334,0.024058837,0.011437172,0.016367912,0.006560199],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004313256,0.000021250493,0.0003733857,0.000101517035,0.000022573447,0.00007527963,0.008098698,0.000044587887,0.00022850094,0.8698763,0.10491983,0.016194893],"study_design_scores_gemma":[0.000017113929,0.000019693167,0.0002536903,0.0001986584,0.000010979771,0.00014984293,0.006190676,0.00012138204,0.00017734569,0.5002042,0.49263218,0.000024214602],"about_ca_topic_score_codex":0.0031507516,"about_ca_topic_score_gemma":0.004318889,"teacher_disagreement_score":0.017516613,"about_ca_system_score_codex":0.0031922811,"about_ca_system_score_gemma":0.004266083,"threshold_uncertainty_score":0.06720835},"labels":[],"label_agreement":null},{"id":"W4230890156","doi":"10.32920/14637564.v1","title":"Adapting Engineering Design Tools to Include Human Factors","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Workplace Safety and Insurance Board","keywords":"Engineering design process; Process (computing); Engineering; Process management; Computer science; Mechanical engineering","score_opus":0.3710890002479594,"score_gpt":0.40909149010018264,"score_spread":0.038002489852223265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230890156","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00868719,0.00027639035,0.95900506,0.0017489361,0.00038940783,0.0012120731,0.00023767559,0.0042275973,0.024215622],"genre_scores_gemma":[0.033469707,0.00032417107,0.95708907,0.0003853713,0.000060771385,0.0011431968,0.00033722364,0.0008403059,0.006350083],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97309995,0.01259283,0.0026560468,0.0020608658,0.0088851405,0.00070529274],"domain_scores_gemma":[0.90536815,0.04921477,0.0036769074,0.018456094,0.021829495,0.001454587],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.035329334,0.0023781587,0.0008273504,0.0062686014,0.0015358501,0.007830442,0.0035473309,0.0017367781,0.010277615],"category_scores_gemma":[0.09386983,0.0015641883,0.0020062537,0.0026877413,0.0023704874,0.0074561676,0.005308291,0.0035882879,0.0047726007],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020920069,0.0007567396,0.008070503,0.0020464624,0.0002115121,0.0007438725,0.014871047,0.03352798,0.013127789,0.11537705,0.028910417,0.78214735],"study_design_scores_gemma":[0.00028452108,0.0006831463,0.00475128,0.0028304085,0.0002756587,0.0007952209,0.006631474,0.055009488,0.020818235,0.12573771,0.7817574,0.00042549538],"about_ca_topic_score_codex":0.00241166,"about_ca_topic_score_gemma":0.004184755,"teacher_disagreement_score":0.035329334,"about_ca_system_score_codex":0.0032258418,"about_ca_system_score_gemma":0.007710398,"threshold_uncertainty_score":0.18684155},"labels":[],"label_agreement":null},{"id":"W4231157826","doi":"10.4102/sajems.v19i1.1308","title":"Comparing the power and influence of functional managers with that of project managers in matrix organisations: The challenge in duality of command","year":2016,"lang":"en","type":"article","venue":"South African Journal of Economic and Management Sciences","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Functional manager; Project manager; Ambiguity; Business; Phase (matter); Perception; Project sponsorship; Public relations; Project management; Knowledge management; Process management; Project management triangle; Psychology; Management; Project charter; Computer science; Political science","score_opus":0.09220294742928917,"score_gpt":0.31568914197545334,"score_spread":0.22348619454616417,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4231157826","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9950047,0.000088468674,0.00085748127,0.00026075446,0.000007078131,0.000011541521,0.0000030247786,0.000002388957,0.003764495],"genre_scores_gemma":[0.99971277,0.00002580809,0.00008085795,0.00001853838,0.0000035895814,0.0000048149486,0.0000018266161,0.0000012105467,0.0001505438],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.989734,0.0066831056,0.00028297902,0.000423208,0.0017706864,0.0011060159],"domain_scores_gemma":[0.9710339,0.017003164,0.004831273,0.00092320715,0.0024079625,0.003800547],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0103157945,0.00023856673,0.0002637146,0.0020060502,0.002027722,0.0034103957,0.0005215232,0.00042124125,0.0017171173],"category_scores_gemma":[0.036617618,0.0002527688,0.00018204155,0.0007487026,0.0044837315,0.0022091707,0.0034991563,0.0007046289,0.00016606538],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007928622,0.00033306828,0.58135563,0.00017209808,0.00011104992,0.00050541153,0.32667908,0.00051799003,0.004380101,0.0138727445,0.000673537,0.07060634],"study_design_scores_gemma":[0.000054127802,0.00075308175,0.6643995,0.0001319412,0.00004014596,0.00028279552,0.3200323,0.0016998351,0.0011463726,0.0051143747,0.0062959255,0.00004965853],"about_ca_topic_score_codex":0.003409814,"about_ca_topic_score_gemma":0.004546774,"teacher_disagreement_score":0.0103157945,"about_ca_system_score_codex":0.0016110513,"about_ca_system_score_gemma":0.0016716,"threshold_uncertainty_score":0.054555774},"labels":[],"label_agreement":null},{"id":"W4231658743","doi":"10.24908/pceea.v0i0.5915","title":"CANADIAN CIVIL ENGINEERING AND SUSTAINABLE DEVELOPMENT COMPETENCE","year":2015,"lang":"en","type":"article","venue":"Proceedings of the Canadian Engineering Education Association (CEEA)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Competence (human resources); Sustainable development; Engineering ethics; Political science; Environmental planning; Geography; Engineering; Regional science; Environmental ethics; Management; Economics; Philosophy; Law","score_opus":0.019105172901586153,"score_gpt":0.24075819022430153,"score_spread":0.2216530173227154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4231658743","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005739665,0.0014711096,0.00095294043,0.010488159,0.0028498939,0.00026865822,0.010841067,0.00022974187,0.96715873],"genre_scores_gemma":[0.07700043,0.002847105,0.0027465639,0.0019929619,0.00032677915,0.00030942072,0.010961515,0.0001500963,0.90366524],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9903426,0.00046194773,0.00030182156,0.00050400785,0.0061074817,0.002282034],"domain_scores_gemma":[0.97425824,0.0009980485,0.0003061112,0.0010876401,0.017657332,0.005692648],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.004839472,0.00091307424,0.0009679676,0.006682224,0.0094851935,0.008446262,0.0031568757,0.0019180969,0.30601445],"category_scores_gemma":[0.01626831,0.0005761948,0.0007363857,0.0072914655,0.002072606,0.0042752055,0.0052733864,0.0021519596,0.05452573],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000677314,0.00009332175,0.0016531087,0.00038561085,0.000009630774,0.00017302502,0.0010239776,0.00014157801,0.00083731336,0.039133016,0.8314439,0.1250378],"study_design_scores_gemma":[0.000012278589,0.000021001873,0.0059520975,0.00024772665,0.000007739985,0.00008250624,0.0010557153,0.00010203893,0.00039186087,0.0012760422,0.9908317,0.000019297378],"about_ca_topic_score_codex":0.85931695,"about_ca_topic_score_gemma":0.92086643,"teacher_disagreement_score":0.9661217,"about_ca_system_score_codex":0.033878323,"about_ca_system_score_gemma":0.13680379,"threshold_uncertainty_score":0.98988616},"labels":[],"label_agreement":null},{"id":"W4231785345","doi":"10.1177/0361198105190700104","title":"Forecasting Payments Made under Construction Contracts","year":2005,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Victoria General Hospital","funders":"North Carolina Department of Transportation","keywords":"Payment; Pace; Cash flow; Cash; Construction management; Work (physics); Business; Actuarial science; Finance; Operations research; Economics; Operations management; Engineering; Civil engineering; Geography","score_opus":0.2780014604305781,"score_gpt":0.45239648013009715,"score_spread":0.17439501969951904,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4231785345","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9877061,0.000053360694,0.005780599,0.00024438452,0.000016923605,0.000059462734,0.0024927158,0.000109708635,0.003536706],"genre_scores_gemma":[0.98667103,0.00011350903,0.0069685495,0.000022064283,0.000017167611,0.00005719962,0.0042062337,0.000024073888,0.0019200977],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978198,0.00055422663,0.00016669332,0.0003266057,0.0008894673,0.00024322506],"domain_scores_gemma":[0.98539484,0.0062148417,0.0032689972,0.00076722965,0.0037325714,0.0006215701],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002947362,0.00047430486,0.0002662074,0.002985347,0.00047479704,0.0014175699,0.0006602162,0.000683319,0.0013492422],"category_scores_gemma":[0.017910777,0.00035521452,0.00032597862,0.0034156018,0.00024827293,0.001070823,0.0005398521,0.0007658387,0.0006192919],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027309064,0.00020177934,0.7699208,0.000040190487,0.00004999211,0.00023481264,0.00072237226,0.14661656,0.0008889306,0.0032238697,0.008478612,0.069348924],"study_design_scores_gemma":[0.0000172314,0.00013156909,0.47427386,0.000033687607,0.000021306447,0.000081782426,0.0010374549,0.51535684,0.0010103798,0.0015315609,0.00645972,0.000044556535],"about_ca_topic_score_codex":0.058845054,"about_ca_topic_score_gemma":0.061894216,"teacher_disagreement_score":0.058845054,"about_ca_system_score_codex":0.0033048936,"about_ca_system_score_gemma":0.0019537376,"threshold_uncertainty_score":0.11700505},"labels":[],"label_agreement":null},{"id":"W4233020731","doi":"10.32920/ryerson.14660343","title":"Evaluating a Multiple Criteria Decision Support Tool for Assessing Sustainability Implications of Engineering Projects","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Sustainability; Business; Corporate social responsibility; Sustainability organizations; Process (computing); Process management; Decision support system; Corporate sustainability; Social sustainability; Computer science; Public relations; Political science","score_opus":0.20259312631037604,"score_gpt":0.4921909365925274,"score_spread":0.28959781028215137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4233020731","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76323384,0.00058891263,0.21188542,0.000691724,0.00012123821,0.0027375687,0.000904823,0.001455953,0.018380387],"genre_scores_gemma":[0.558574,0.0002982772,0.43703872,0.00011892879,0.00002619289,0.0008247857,0.000925084,0.00010276225,0.002091307],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.984009,0.008756072,0.0010311307,0.00068579917,0.005081934,0.00043614832],"domain_scores_gemma":[0.9269486,0.06299094,0.0020185676,0.0014668923,0.00561713,0.000957965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.018266775,0.0015770467,0.001257319,0.0053343303,0.00079413806,0.0046025366,0.0015091298,0.0014359362,0.0048028785],"category_scores_gemma":[0.048347436,0.00040475477,0.0011213687,0.0029817626,0.00070436066,0.0032099644,0.0021409008,0.00100325,0.000527053],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003914706,0.002803509,0.015630165,0.0018666777,0.00037179032,0.0004654103,0.0019339314,0.17301589,0.011818014,0.011872774,0.004773805,0.7715333],"study_design_scores_gemma":[0.00078867533,0.00594454,0.012856159,0.00061377947,0.000283748,0.00026533764,0.0031835763,0.93143356,0.016549595,0.016543694,0.011243024,0.00029424168],"about_ca_topic_score_codex":0.002821856,"about_ca_topic_score_gemma":0.0035863975,"teacher_disagreement_score":0.018266775,"about_ca_system_score_codex":0.0028391907,"about_ca_system_score_gemma":0.0023795585,"threshold_uncertainty_score":0.09660512},"labels":[],"label_agreement":null},{"id":"W4233146621","doi":"10.1007/978-3-319-66685-3_15","title":"Construction Claims","year":2017,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"IBI Group (Canada)","funders":"","keywords":"Payment; Business; Element (criminal law); Construction contract; Law and economics; Risk analysis (engineering); Economics; Finance; Contract management; Law; Political science; Marketing","score_opus":0.16643085487557507,"score_gpt":0.378415329182948,"score_spread":0.21198447430737294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4233146621","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00080446183,0.00025006093,0.0012709312,0.0011201412,0.00016514026,0.000014161836,0.00006354556,0.000030483012,0.9962811],"genre_scores_gemma":[0.06626105,0.000943997,0.0012461521,0.00097381225,0.000342801,0.000084813684,0.00036959912,0.0001114419,0.92966634],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981377,0.00029000198,0.000056301214,0.00032658078,0.00094713655,0.0002422685],"domain_scores_gemma":[0.99902964,0.00022420273,0.000042476284,0.00028772032,0.00033194825,0.000084027364],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001511091,0.00068741274,0.00044865138,0.0020229956,0.003907345,0.008168919,0.0014682121,0.0030753477,0.14463936],"category_scores_gemma":[0.0046440233,0.00034635232,0.0004392938,0.0016617189,0.0043422417,0.005680367,0.004080447,0.003634705,0.035129245],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009915013,0.000013916425,0.00009807199,0.000025064357,0.0000016609074,0.00003533488,0.0006505588,0.00011353843,0.00007186509,0.91745305,0.053934224,0.027592925],"study_design_scores_gemma":[0.0000033878284,0.000007008961,0.00026194123,0.00009571982,0.0000029533194,0.00005547763,0.00062854047,0.00020113918,0.00014830324,0.18171231,0.8168766,0.0000065213612],"about_ca_topic_score_codex":0.00495589,"about_ca_topic_score_gemma":0.0069531,"teacher_disagreement_score":0.14463936,"about_ca_system_score_codex":0.0036115937,"about_ca_system_score_gemma":0.0026747508,"threshold_uncertainty_score":0.48386687},"labels":[],"label_agreement":null},{"id":"W4233278085","doi":"10.32920/ryerson.14654304.v1","title":"A competitive bidding decision-making model considering correlation","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Bidding; Markup language; Competitor analysis; Correlation coefficient; Profit (economics); Correlation; Econometrics; Computer science; Operations research; Mathematics; Economics; Statistics; Microeconomics; Business; Marketing; XML","score_opus":0.11968753916731295,"score_gpt":0.39429703817321005,"score_spread":0.2746094990058971,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4233278085","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16617575,0.00072654814,0.80218,0.0015884532,0.00013785732,0.00037722703,0.00072634476,0.00021915145,0.027868645],"genre_scores_gemma":[0.9500714,0.00047435114,0.033726007,0.00014863619,0.00006450698,0.00043006684,0.00025000743,0.000030301588,0.0148046985],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99624026,0.001510045,0.00017558732,0.0006972878,0.000697621,0.00067925977],"domain_scores_gemma":[0.9950659,0.0031340066,0.00056589284,0.00012690529,0.0007768349,0.00033039766],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004702754,0.0012359793,0.0025382242,0.0011763973,0.0009202185,0.0031230396,0.0030336818,0.0027618126,0.006815206],"category_scores_gemma":[0.0064009395,0.00097236835,0.0016446101,0.0016571861,0.0014161883,0.001982982,0.0013566273,0.0021668102,0.00084309326],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018001968,0.00010426593,0.0012863986,0.00010680013,0.00008236331,0.0004169961,0.00021987168,0.92172116,0.0007795035,0.06489968,0.00086641364,0.009336507],"study_design_scores_gemma":[0.000024266412,0.00004127631,0.00020815164,0.000006160957,0.000018598092,0.00004288653,0.00002621731,0.99047256,0.0000728827,0.008769168,0.00030080188,0.000017026676],"about_ca_topic_score_codex":0.012825608,"about_ca_topic_score_gemma":0.006961884,"teacher_disagreement_score":0.012825608,"about_ca_system_score_codex":0.00255848,"about_ca_system_score_gemma":0.002302944,"threshold_uncertainty_score":0.025501907},"labels":[],"label_agreement":null},{"id":"W4236095869","doi":"10.1504/ijise.2018.094613","title":"Using a fuzzy MCDM approach to measure project complexity: a case study","year":2018,"lang":"en","type":"article","venue":"International Journal of Industrial and Systems Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Interdependence; Complexity management; Project management; Multiple-criteria decision analysis; Variety (cybernetics); Computer science; Fuzzy logic; Context (archaeology); Hierarchy; Operations research; Project management triangle; Process (computing); Management science; Process management; Systems engineering; Engineering; Artificial intelligence; Business","score_opus":0.5054502906541717,"score_gpt":0.41687712278040595,"score_spread":0.08857316787376573,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236095869","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8933731,0.00028946222,0.09645217,0.00055721676,0.00002006717,0.0007948203,0.00023991334,0.000050323255,0.0082229385],"genre_scores_gemma":[0.8946918,0.00017223001,0.104003586,0.000023405693,0.0000048949632,0.00021876999,0.00006196497,0.0000072526614,0.0008161069],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99613357,0.002544156,0.00019226882,0.00018510003,0.00074365595,0.00020129664],"domain_scores_gemma":[0.9930507,0.0050278,0.0003433611,0.00038359792,0.0009799136,0.00021467223],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006269275,0.00052227906,0.00069630134,0.0032483276,0.0017309042,0.0013946202,0.0009456938,0.0019263147,0.0018545479],"category_scores_gemma":[0.007966749,0.00035702626,0.00070791546,0.003237391,0.0009524009,0.0010330456,0.0012270409,0.0007404146,0.0001282435],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015810437,0.0034543215,0.07646301,0.0018000569,0.00034256504,0.013792047,0.014436616,0.4634002,0.021058885,0.046170443,0.0036976656,0.35380316],"study_design_scores_gemma":[0.0002556808,0.0011041745,0.025392175,0.00025418436,0.00013566353,0.0019061229,0.011223246,0.9311669,0.010923507,0.010149046,0.0073358463,0.00015341469],"about_ca_topic_score_codex":0.009222214,"about_ca_topic_score_gemma":0.01765947,"teacher_disagreement_score":0.009222214,"about_ca_system_score_codex":0.002439956,"about_ca_system_score_gemma":0.0013884824,"threshold_uncertainty_score":0.0331555},"labels":[],"label_agreement":null},{"id":"W4236409926","doi":"10.1007/978-981-13-0370-8_14-2","title":"Governance of Organizational Project Management and Megaprojects Using the Viable Project Governance Model","year":2020,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Project governance; Corporate governance; Business; Project management; Process management; Engineering; Systems engineering; Finance","score_opus":0.1050747743707069,"score_gpt":0.3208700161076057,"score_spread":0.2157952417368988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236409926","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032628324,0.0034511075,0.58665925,0.008090667,0.0002745514,0.0002339718,0.00010774692,0.000109146,0.3684453],"genre_scores_gemma":[0.8274682,0.0029911115,0.09875544,0.00046271543,0.00020389973,0.0005512218,0.00015562863,0.00007947853,0.06933225],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9973947,0.0017791021,0.00006195456,0.0001999786,0.00038864146,0.00017562507],"domain_scores_gemma":[0.99865866,0.0007796225,0.00014154664,0.00019265605,0.00012489923,0.00010256417],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002390008,0.00038528797,0.0003719137,0.00060503656,0.0007971723,0.005079789,0.0010704105,0.0014212555,0.004127997],"category_scores_gemma":[0.0032577964,0.0003579072,0.00050089584,0.0014354583,0.0032437472,0.003739603,0.0015597489,0.0015184698,0.00042063658],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019504912,0.000007823826,0.00012827759,0.000011791598,0.0000032680568,0.0000183254,0.00018583486,0.0052004303,0.000069161186,0.9866078,0.000949176,0.0068161315],"study_design_scores_gemma":[0.0000040267164,0.000013935914,0.00042942015,0.00004735367,0.0000043588166,0.000030962317,0.00041084492,0.023518972,0.00010562631,0.95658153,0.018846516,0.000006459021],"about_ca_topic_score_codex":0.0030105624,"about_ca_topic_score_gemma":0.005471568,"teacher_disagreement_score":0.005079789,"about_ca_system_score_codex":0.0026070436,"about_ca_system_score_gemma":0.00255174,"threshold_uncertainty_score":0.018915534},"labels":[],"label_agreement":null},{"id":"W4236748133","doi":"10.4018/978-1-5225-9615-8.ch055","title":"Revisiting Project Definition/Initiation for Telemedicine Services","year":2019,"lang":"en","type":"book-chapter","venue":"IGI Global eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Telehealth; Telemedicine; Telecare; Business model; Business; Knowledge management; Business plan; Process management; Conceptualization; Health care; Computer science; Marketing; Political science","score_opus":0.10123371934380958,"score_gpt":0.3507186024885039,"score_spread":0.2494848831446943,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236748133","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33770174,0.0022931711,0.45121154,0.07117772,0.0011937844,0.028988257,0.0012494597,0.0005596547,0.10562468],"genre_scores_gemma":[0.7620328,0.0014490645,0.20362048,0.004128979,0.00009974148,0.0211604,0.0007791993,0.00023664635,0.006492698],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.8036858,0.13279265,0.017770812,0.008780801,0.026313517,0.01065643],"domain_scores_gemma":[0.7541178,0.14488624,0.025962465,0.016246134,0.044241443,0.014545876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.1564077,0.0011023496,0.0011298852,0.005647119,0.011305528,0.02379933,0.004853653,0.004622229,0.0044425805],"category_scores_gemma":[0.14780512,0.0018211685,0.001862321,0.0076423506,0.016269935,0.017995594,0.016511567,0.011163968,0.0012420807],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019869438,0.0010603237,0.032007992,0.0024539027,0.000059602917,0.0011727151,0.27516142,0.003553984,0.0027547851,0.5150614,0.014280676,0.15223446],"study_design_scores_gemma":[0.00019070171,0.0010193044,0.03184645,0.0057515753,0.000088204266,0.00071786024,0.5938416,0.008998864,0.0053502037,0.11442291,0.23742236,0.00034991853],"about_ca_topic_score_codex":0.013551303,"about_ca_topic_score_gemma":0.013932023,"teacher_disagreement_score":0.1564077,"about_ca_system_score_codex":0.030878855,"about_ca_system_score_gemma":0.09430908,"threshold_uncertainty_score":0.8271729},"labels":[],"label_agreement":null},{"id":"W4237694057","doi":"10.1016/s0380-1330(03)70472-9","title":"IAGLR Awards","year":2003,"lang":"en","type":"article","venue":"Journal of Great Lakes Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Section (typography); Stakeholder; USable; Knowledge management; Project management; Stakeholder management; Stakeholder engagement; Business; Process management; Political science; Sociology; Public relations; Engineering; Computer science","score_opus":0.2789763030583725,"score_gpt":0.4888342362566131,"score_spread":0.2098579331982406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4237694057","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004900895,0.0054633636,0.0019164719,0.099588476,0.10308029,0.0004926349,0.004374052,0.0015622756,0.7786215],"genre_scores_gemma":[0.0054023736,0.00069740805,0.00057192275,0.0028798787,0.0038646194,0.000059115195,0.0011145851,0.00015418453,0.98525584],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976113,0.00022012563,0.00006392887,0.00022430073,0.0012732672,0.00060699624],"domain_scores_gemma":[0.9895495,0.00022356905,0.00018039544,0.0004828,0.003238292,0.0063253865],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0026516279,0.0006703208,0.001068606,0.002440961,0.0015175857,0.0038843197,0.0016790143,0.003099719,0.4391534],"category_scores_gemma":[0.006448237,0.00027637652,0.00078330963,0.0014268367,0.0004831702,0.00096646557,0.0050261575,0.0025731164,0.2700497],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000081003396,0.000069591755,0.0003102327,0.000043478278,0.0000058771852,0.000086712884,0.000027802647,0.00005085424,0.00030733531,0.002664353,0.9535154,0.04283734],"study_design_scores_gemma":[0.000020926653,0.000030822233,0.00085355545,0.000022079586,0.000003848679,0.000081033104,0.00004241968,0.00010835323,0.00008383987,0.00058373914,0.99816555,0.0000039226493],"about_ca_topic_score_codex":0.0027265952,"about_ca_topic_score_gemma":0.010318087,"teacher_disagreement_score":0.4391534,"about_ca_system_score_codex":0.0017757999,"about_ca_system_score_gemma":0.004664432,"threshold_uncertainty_score":0.79997957},"labels":[],"label_agreement":null},{"id":"W4237723500","doi":"10.1002/pam.1001.abs","title":"Decision Aiding, Not Dispute Resolution: Creating Insights through Structured Environmental Decisions","year":2001,"lang":"en","type":"article","venue":"Journal of Policy Analysis and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"BC Hydro (Canada); University of British Columbia","funders":"","keywords":"Stakeholder; Dispute resolution; Public participation; Constructive; Alternative dispute resolution; Process (computing); Decision analysis; Stakeholder analysis; Conflict resolution; Management science; Political science; Public relations; Business; Computer science; Economics; Law","score_opus":0.05478081779709702,"score_gpt":0.36142877364865805,"score_spread":0.306647955851561,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4237723500","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04015947,0.0045231977,0.7680393,0.05148974,0.00064122916,0.0014808981,0.00038656886,0.000519363,0.1327603],"genre_scores_gemma":[0.42713585,0.005518751,0.5561537,0.0022002188,0.0002660677,0.0014898644,0.00038451987,0.00011435935,0.0067366706],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.94142556,0.04945161,0.0013782509,0.001356102,0.0050432314,0.0013452523],"domain_scores_gemma":[0.93726575,0.051868226,0.0028612288,0.0042725103,0.002102902,0.0016293946],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.05587028,0.0016279017,0.0012242974,0.005011991,0.0053699827,0.01736746,0.0039617736,0.005549993,0.007364703],"category_scores_gemma":[0.057620995,0.0008451946,0.0012904333,0.005804439,0.03120039,0.02884947,0.013061863,0.005985588,0.0014548745],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006659704,0.00013956723,0.0005400174,0.0007579962,0.000035726767,0.000364823,0.017942509,0.005341479,0.0008274579,0.8849076,0.0042216512,0.08485464],"study_design_scores_gemma":[0.00006240283,0.00006107609,0.00019318366,0.00063081546,0.000012748176,0.00010123359,0.00962718,0.006627289,0.0008430049,0.92922527,0.052576646,0.00003929438],"about_ca_topic_score_codex":0.0015673334,"about_ca_topic_score_gemma":0.0024336306,"teacher_disagreement_score":0.05587028,"about_ca_system_score_codex":0.005151196,"about_ca_system_score_gemma":0.011322883,"threshold_uncertainty_score":0.2954738},"labels":[],"label_agreement":null},{"id":"W4238071212","doi":"10.1139/cjce-27-1-73","title":"A preliminary study of the factors affecting the cost escalation of construction projects","year":2000,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Engineering; Operations management; Computer science; Operations research","score_opus":0.03955590778908478,"score_gpt":0.266038597441682,"score_spread":0.22648268965259724,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4238071212","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9966246,0.00006336857,0.0003180699,0.000057493362,0.0000013742979,0.000063539046,0.000086435015,0.0000031254972,0.0027819863],"genre_scores_gemma":[0.9987098,0.000060228715,0.00048952224,0.000008275098,0.0000032829505,0.000020084291,0.000098612676,0.0000017831093,0.00060832564],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9986105,0.0004707706,0.00014434397,0.00006695432,0.00048913894,0.00021814274],"domain_scores_gemma":[0.9793743,0.013365225,0.0031764738,0.0002869928,0.0032468438,0.0005502684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017706958,0.0003055388,0.00020407273,0.0011273292,0.00072919746,0.0017930169,0.00042934087,0.0005063523,0.0027861402],"category_scores_gemma":[0.0226152,0.00018894495,0.00041198084,0.0016778967,0.0003644658,0.0010957291,0.00037775963,0.00057947496,0.00025854667],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017287051,0.0011084888,0.9079364,0.00030769556,0.00010467318,0.0010525873,0.0029666084,0.015564499,0.013365954,0.0020652376,0.0004630801,0.053336073],"study_design_scores_gemma":[0.000013073845,0.0008596164,0.9863846,0.000017364304,0.000047057292,0.00016177403,0.0036208238,0.005780619,0.0016141181,0.00046767227,0.0010109586,0.000022327253],"about_ca_topic_score_codex":0.02205029,"about_ca_topic_score_gemma":0.03508577,"teacher_disagreement_score":0.02205029,"about_ca_system_score_codex":0.0017832001,"about_ca_system_score_gemma":0.0019799438,"threshold_uncertainty_score":0.043843865},"labels":[],"label_agreement":null},{"id":"W4238229928","doi":"10.6000/1929-7092.2018.07.06","title":"Rating Methodology: New Look and New Horizons","year":2018,"lang":"en","type":"article","venue":"Journal of Reviews on Global Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":88,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"New horizons; Econometrics; Economics; Mathematics; Engineering; Aerospace engineering","score_opus":0.37445393012580447,"score_gpt":0.45355298501601504,"score_spread":0.07909905489021057,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4238229928","genre_codex":"review","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023318534,0.83856076,0.057736848,0.0842779,0.010031478,0.000072608615,0.00012999937,0.0001319825,0.0067266277],"genre_scores_gemma":[0.121039994,0.596587,0.14159496,0.048796043,0.08259994,0.00033149676,0.00038759518,0.00042945857,0.008233519],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.94759536,0.02892961,0.0041418,0.005311524,0.013381017,0.00064064807],"domain_scores_gemma":[0.7359484,0.19194464,0.0076581044,0.014523247,0.04630733,0.003618302],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.10369335,0.0021212546,0.005405113,0.0066869035,0.0012810315,0.014336147,0.005553937,0.008857476,0.006705464],"category_scores_gemma":[0.14469486,0.0011898266,0.0020279305,0.0051006074,0.014796811,0.02962968,0.003587248,0.0122038545,0.0016751073],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032522247,0.00014417293,0.0042022406,0.00590748,0.0005844458,0.00017218581,0.001465451,0.0012690878,0.0008091016,0.20936811,0.046563964,0.72918856],"study_design_scores_gemma":[0.0002452479,0.0006014256,0.010616259,0.013788308,0.0005273242,0.0011227764,0.002604569,0.018596305,0.0009754288,0.5309406,0.419251,0.00073074986],"about_ca_topic_score_codex":0.0037458527,"about_ca_topic_score_gemma":0.0065894877,"teacher_disagreement_score":0.10369335,"about_ca_system_score_codex":0.005121824,"about_ca_system_score_gemma":0.0042577256,"threshold_uncertainty_score":0.54838943},"labels":[],"label_agreement":null},{"id":"W4239553224","doi":"10.1007/978-3-642-31054-6_7","title":"Project Networks","year":2012,"lang":"en","type":"book-chapter","venue":"Springer texts in business and economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University; University of New Brunswick","funders":"","keywords":"Plan (archaeology); Work (physics); Task (project management); Interdependence; Foundation (evidence); Engineering; Resource (disambiguation); Operations research; Computer science; Architectural engineering; Operations management; Engineering management; Political science; Systems engineering; Mechanical engineering; Law; History","score_opus":0.0768708975010116,"score_gpt":0.29363207898336563,"score_spread":0.21676118148235402,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4239553224","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0056135375,0.0007606768,0.06454586,0.0017895813,0.00029236675,0.00018543932,0.0016131849,0.0006157259,0.92458355],"genre_scores_gemma":[0.12983787,0.0030483238,0.033448976,0.0004184995,0.0002040621,0.0006810755,0.0045161964,0.00045139896,0.8273937],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99923885,0.00022526094,0.00004311498,0.00015697759,0.00025996007,0.00007592243],"domain_scores_gemma":[0.9989503,0.00023878385,0.00012126553,0.0002475589,0.0002675168,0.00017465868],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00075618457,0.0004915241,0.0002601956,0.0018376835,0.0011156062,0.003308016,0.00078832713,0.00086467416,0.13100275],"category_scores_gemma":[0.0035415979,0.00032359688,0.00030188178,0.0027290285,0.0005575837,0.0041605607,0.0022336897,0.0007338819,0.033084422],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032814787,0.00003235019,0.0007628717,0.00015744024,0.000012994135,0.00011388017,0.00044642412,0.0030670199,0.00046717815,0.6022329,0.111644305,0.2810298],"study_design_scores_gemma":[0.0000059107883,0.000017866458,0.00059354404,0.00009056962,0.0000067735414,0.00017947773,0.0003511754,0.002561577,0.0003011089,0.16461639,0.83126676,0.000008717014],"about_ca_topic_score_codex":0.0016192325,"about_ca_topic_score_gemma":0.0018349016,"teacher_disagreement_score":0.13100275,"about_ca_system_score_codex":0.0009801931,"about_ca_system_score_gemma":0.0011172498,"threshold_uncertainty_score":0.43824786},"labels":[],"label_agreement":null},{"id":"W4242120980","doi":"10.17722/ijme.v3i2.159","title":"A Comparative Analysis of Defensive Routines and Theories-In-Use of Engineering and Non-Engineering Managers","year":2014,"lang":"en","type":"article","venue":"International Journal of Management Excellence","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Management science; Engineering","score_opus":0.030302023490956013,"score_gpt":0.3096449342712854,"score_spread":0.2793429107803294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4242120980","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9992335,0.000036045472,0.000054752836,0.000027390954,9.3923984e-7,0.0000020194288,0.000010207431,0.0000013014362,0.0006338881],"genre_scores_gemma":[0.9996798,0.00001807587,0.000035457484,0.000008426487,8.272323e-7,0.0000018825737,0.000018434952,0.0000012304444,0.00023583125],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9989937,0.00047474142,0.000076043565,0.00007299618,0.00018851251,0.00019396344],"domain_scores_gemma":[0.975183,0.016292434,0.0040642363,0.00071052334,0.0018691913,0.0018806241],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016505263,0.0001228709,0.000199488,0.0016378743,0.0006626551,0.0017486655,0.00040044478,0.00039142522,0.0025563864],"category_scores_gemma":[0.01802109,0.00013779291,0.0001825599,0.0012520035,0.00075741886,0.0010656436,0.0012765311,0.0004365332,0.00029184046],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00062039023,0.00032894188,0.94533116,0.000044132183,0.00005250201,0.00017581318,0.029009953,0.00012388313,0.0022514102,0.0012213797,0.0001682723,0.020672211],"study_design_scores_gemma":[0.000008558747,0.00032208505,0.9638037,0.000016215925,0.000023764007,0.00010964749,0.03409837,0.00027974884,0.0004484508,0.00025352382,0.00062515633,0.000010841403],"about_ca_topic_score_codex":0.0025582828,"about_ca_topic_score_gemma":0.004923237,"teacher_disagreement_score":0.0025582828,"about_ca_system_score_codex":0.0007093658,"about_ca_system_score_gemma":0.000785967,"threshold_uncertainty_score":0.008728921},"labels":[],"label_agreement":null},{"id":"W4242775256","doi":"10.4018/978-1-5225-7661-7.ch022","title":"Project Management in Government","year":2018,"lang":"en","type":"book-chapter","venue":"Advances in public policy and administration (APPA) book series","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Transformational leadership; Mindset; Government (linguistics); Existentialism; Political science; Business; Public relations; Process management; Computer science","score_opus":0.060040752387389026,"score_gpt":0.36553114251985214,"score_spread":0.3054903901324631,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4242775256","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028239917,0.041561406,0.011219772,0.01658593,0.0018478325,0.0000945962,0.000059618018,0.0001491155,0.9256578],"genre_scores_gemma":[0.098753065,0.04941066,0.011880724,0.0047191284,0.0009802991,0.00035228592,0.00015066011,0.00023740463,0.8335158],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984805,0.0007310561,0.000055925655,0.00012344269,0.0004981192,0.000110986744],"domain_scores_gemma":[0.99927384,0.00030774658,0.000049265895,0.00009310152,0.00017455053,0.00010152151],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001155012,0.00043994273,0.00024254853,0.0007586491,0.0021515542,0.005257836,0.0006000929,0.0013562811,0.0138941845],"category_scores_gemma":[0.0020201288,0.00022312431,0.00021808605,0.0018097287,0.003967609,0.003320474,0.0024929172,0.0024985275,0.0042677927],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000052414352,0.000025262467,0.00009346173,0.00014220434,0.0000025691327,0.000043607935,0.0033060412,0.00051168323,0.00010087934,0.7414015,0.12956932,0.12479829],"study_design_scores_gemma":[0.0000016798353,0.000008707747,0.00014835046,0.00024390819,8.322055e-7,0.000060374954,0.0009435131,0.0001666887,0.000056094435,0.07076089,0.92760587,0.0000031160203],"about_ca_topic_score_codex":0.0028285754,"about_ca_topic_score_gemma":0.004220517,"teacher_disagreement_score":0.0138941845,"about_ca_system_score_codex":0.003995309,"about_ca_system_score_gemma":0.0050233775,"threshold_uncertainty_score":0.046480656},"labels":[],"label_agreement":null},{"id":"W4242980077","doi":"10.22215/etd/2021-14377","title":"Modelling Risk in Highway Infrastructure Investments: Decision-Theoretic, Bayesian, and Factor Analysis Approaches","year":2021,"lang":"en","type":"dissertation","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Umm Al-Qura University","keywords":"Sustainability; Risk analysis (engineering); Investment (military); Identification (biology); Risk management; Bayesian network; Engineering; Business; Computer science; Finance","score_opus":0.056770074304949444,"score_gpt":0.31725838886229946,"score_spread":0.26048831455735,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4242980077","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03861429,0.0045264405,0.94743603,0.001786759,0.00008798121,0.00011262351,0.00017893269,0.000065384076,0.00719158],"genre_scores_gemma":[0.8224597,0.011438012,0.15845637,0.00028563832,0.0004399931,0.00040738448,0.00031527493,0.00007028043,0.0061272946],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9960239,0.002608628,0.00014453467,0.00032232289,0.0006245983,0.000276136],"domain_scores_gemma":[0.983761,0.014292998,0.00091454457,0.00019753815,0.00060979906,0.000224069],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009728517,0.001885892,0.0016534256,0.0028189567,0.0006031107,0.003511303,0.0015510034,0.0020963997,0.0019149191],"category_scores_gemma":[0.01853149,0.0010429835,0.0017627514,0.0028317273,0.0024444796,0.0036021788,0.0018177425,0.0026261217,0.00030879935],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028852492,0.000082699065,0.0014709054,0.000087266606,0.0000926175,0.00004498449,0.00010588928,0.88820267,0.00009407906,0.0908148,0.00056011736,0.018415099],"study_design_scores_gemma":[0.0000086282735,0.00004307974,0.0005982776,0.00005935175,0.000029866344,0.00001912166,0.00007718857,0.85607177,0.00006366506,0.14207661,0.00091833354,0.000033997694],"about_ca_topic_score_codex":0.0144247385,"about_ca_topic_score_gemma":0.009607964,"teacher_disagreement_score":0.0144247385,"about_ca_system_score_codex":0.0033377921,"about_ca_system_score_gemma":0.0024406605,"threshold_uncertainty_score":0.051449955},"labels":[],"label_agreement":null},{"id":"W4244522544","doi":"10.1046/j.1365-232x.2002.00242.x","title":"Risk management trends in the construction industry: moving towards joint risk management","year":2002,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Joint (building); Risk management; Business; Risk analysis (engineering); Operations management; Engineering; Finance; Civil engineering","score_opus":0.03564944935920262,"score_gpt":0.27098897647112313,"score_spread":0.23533952711192052,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4244522544","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9967715,0.00016391173,0.00038929068,0.0007071815,0.0000054313423,0.0000139466,0.000016554843,0.0000037099342,0.0019282437],"genre_scores_gemma":[0.99917233,0.00013422807,0.00028300117,0.00006686957,0.00000789298,0.000006811471,0.000020556978,0.0000011228027,0.00030724498],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99571615,0.0015494238,0.00039049605,0.00033267695,0.0015259057,0.00048536554],"domain_scores_gemma":[0.9755376,0.0057487697,0.009670111,0.0007520572,0.0068126908,0.0014787785],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008347644,0.0001532574,0.0002204144,0.0016293073,0.0011815442,0.0034208,0.0006211912,0.00071528804,0.0014361631],"category_scores_gemma":[0.013664031,0.00020904688,0.00018996051,0.001891699,0.0014173298,0.002375268,0.0016947963,0.0011922488,0.00016868701],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015202262,0.00022670365,0.8316993,0.0002820283,0.00002939119,0.00031031622,0.10596541,0.000577364,0.0026978396,0.003016531,0.0007894532,0.054253552],"study_design_scores_gemma":[0.0000063099183,0.00028808208,0.8500822,0.00010138757,0.000009729443,0.00022071794,0.13941732,0.0009888774,0.0006519797,0.0005138786,0.007685595,0.000033953846],"about_ca_topic_score_codex":0.024396801,"about_ca_topic_score_gemma":0.025456764,"teacher_disagreement_score":0.024396801,"about_ca_system_score_codex":0.003291523,"about_ca_system_score_gemma":0.0027337954,"threshold_uncertainty_score":0.048509598},"labels":[],"label_agreement":null},{"id":"W4244585816","doi":"10.32920/ryerson.14660343.v1","title":"Evaluating a Multiple Criteria Decision Support Tool for Assessing Sustainability Implications of Engineering Projects","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Sustainability; Business; Corporate social responsibility; Sustainability organizations; Process (computing); Decision support system; Process management; Social sustainability; Corporate sustainability; Computer science; Public relations; Political science","score_opus":0.20259312631037604,"score_gpt":0.4921909365925274,"score_spread":0.28959781028215137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4244585816","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76323384,0.00058891263,0.21188542,0.000691724,0.00012123821,0.0027375687,0.000904823,0.001455953,0.018380387],"genre_scores_gemma":[0.558574,0.0002982772,0.43703872,0.00011892879,0.00002619289,0.0008247857,0.000925084,0.00010276225,0.002091307],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.984009,0.008756072,0.0010311307,0.00068579917,0.005081934,0.00043614832],"domain_scores_gemma":[0.9269486,0.06299094,0.0020185676,0.0014668923,0.00561713,0.000957965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.018266775,0.0015770467,0.001257319,0.0053343303,0.00079413806,0.0046025366,0.0015091298,0.0014359362,0.0048028785],"category_scores_gemma":[0.048347436,0.00040475477,0.0011213687,0.0029817626,0.00070436066,0.0032099644,0.0021409008,0.00100325,0.000527053],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003914706,0.002803509,0.015630165,0.0018666777,0.00037179032,0.0004654103,0.0019339314,0.17301589,0.011818014,0.011872774,0.004773805,0.7715333],"study_design_scores_gemma":[0.00078867533,0.00594454,0.012856159,0.00061377947,0.000283748,0.00026533764,0.0031835763,0.93143356,0.016549595,0.016543694,0.011243024,0.00029424168],"about_ca_topic_score_codex":0.002821856,"about_ca_topic_score_gemma":0.0035863975,"teacher_disagreement_score":0.018266775,"about_ca_system_score_codex":0.0028391907,"about_ca_system_score_gemma":0.0023795585,"threshold_uncertainty_score":0.09660512},"labels":[],"label_agreement":null},{"id":"W4245388998","doi":"10.17722/ijme.v8i2.886","title":"Perspective of Developer, Buyer, Financier and Equity Participants in Real Estate Project Development Process in India: An important constituent of Construction Industry","year":2017,"lang":"en","type":"article","venue":"International Journal of Management Excellence","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Real estate; Real estate development; Corporate Real Estate; Business; Real estate investment trust; Capitalization rate; Portfolio; Finance; Income approach; Cost approach; Marketing","score_opus":0.14538789908023086,"score_gpt":0.46390461932340654,"score_spread":0.3185167202431757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4245388998","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83136076,0.0029925387,0.004685814,0.026521854,0.0001617302,0.00009088662,0.000073797826,0.000014778424,0.13409774],"genre_scores_gemma":[0.9854425,0.0015725795,0.00049895584,0.00058490713,0.000037529226,0.000013829306,0.000013612552,0.0000036022575,0.011832562],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9984182,0.0007337302,0.000035544155,0.00009638261,0.00018517456,0.0005308435],"domain_scores_gemma":[0.99901056,0.00030375618,0.00014428576,0.000017321565,0.00011266656,0.00041137933],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012608166,0.00022749994,0.00015480882,0.0010098384,0.004727294,0.0060630017,0.0007103687,0.0012617494,0.005730657],"category_scores_gemma":[0.0009541843,0.00021000642,0.00021123643,0.0008874561,0.0029097633,0.0030025695,0.002865094,0.0016888035,0.00036133506],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011241038,0.00038658615,0.10401734,0.00028898226,0.000021037755,0.014913154,0.29270595,0.0011365135,0.0023986746,0.5322277,0.009117498,0.042674176],"study_design_scores_gemma":[0.000013201833,0.00015032095,0.03963408,0.0004196681,0.00003415652,0.004738635,0.7579229,0.0031572436,0.0011030871,0.018938826,0.17383179,0.000056076206],"about_ca_topic_score_codex":0.02116665,"about_ca_topic_score_gemma":0.026427858,"teacher_disagreement_score":0.02116665,"about_ca_system_score_codex":0.0047478126,"about_ca_system_score_gemma":0.0051787742,"threshold_uncertainty_score":0.0420869},"labels":[],"label_agreement":null},{"id":"W4246026647","doi":"10.7202/1071509ar","title":"Workforce Management Decisions in the Construction Industry in the UAE","year":2020,"lang":"en","type":"article","venue":"Journal of Comparative International Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workforce; Productivity; Human resource management; Context (archaeology); Business; Quality (philosophy); Selection (genetic algorithm); Workforce planning; Workforce management; Human resources; Operations management; Knowledge management; Process management; Marketing; Engineering; Management; Computer science; Economics; Economic growth","score_opus":0.24192664870592726,"score_gpt":0.43633609901109754,"score_spread":0.1944094503051703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246026647","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99641186,0.00019228239,0.00037159293,0.00049744954,0.0000048775723,0.000015751304,0.000018468307,0.0000017885533,0.0024859554],"genre_scores_gemma":[0.9988918,0.00017981231,0.00038779335,0.000066415756,0.0000031931772,0.000012785225,0.000013244671,8.240788e-7,0.00044411884],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99658114,0.0023366357,0.000069224305,0.00008677672,0.0001878993,0.0007382447],"domain_scores_gemma":[0.9958533,0.0021009534,0.00082620716,0.000054023367,0.0003763809,0.00078914076],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003377137,0.00020933589,0.00022532092,0.0013343767,0.004002564,0.0034499364,0.0006520464,0.0011766567,0.0016966567],"category_scores_gemma":[0.0071222824,0.0002795455,0.0001325706,0.0013856681,0.0016487836,0.0011185356,0.0020676868,0.0010136855,0.00022463879],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00049100054,0.0014178404,0.6549317,0.00035873003,0.00008874468,0.0078501,0.20294823,0.0131752025,0.0042425143,0.02114305,0.0035545113,0.089798436],"study_design_scores_gemma":[0.000021684542,0.0004919632,0.3793099,0.00028298635,0.00001430677,0.0007517484,0.5843281,0.0071257623,0.0008783756,0.004298087,0.022403428,0.00009363805],"about_ca_topic_score_codex":0.021465357,"about_ca_topic_score_gemma":0.048125308,"teacher_disagreement_score":0.021465357,"about_ca_system_score_codex":0.003522874,"about_ca_system_score_gemma":0.0037006387,"threshold_uncertainty_score":0.04268086},"labels":[],"label_agreement":null},{"id":"W4246223149","doi":"10.2175/193864717822156424","title":"City of Ottawa’s Strategic Infrastructure Management Plan: Development and Application of a Triple-Bottom-Line-“Plus” Risk-Assessment Framework for Collection Systems Criticality Assessment and Needs Prioritization","year":2017,"lang":"en","type":"article","venue":"Proceedings of the Water Environment Federation","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Stantec (Canada)","funders":"","keywords":"Prioritization; Plan (archaeology); Development plan; Criticality; Strategic planning; Risk assessment; Top-down and bottom-up design; Needs assessment; Business; Process management; Environmental planning; Computer science; Engineering; Environmental science; Geography; Civil engineering; Computer security; Political science","score_opus":0.04620049990003587,"score_gpt":0.33163786955495317,"score_spread":0.2854373696549173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246223149","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14138143,0.0018544891,0.32506227,0.053863302,0.0007979973,0.0070603844,0.08166011,0.00598977,0.38233018],"genre_scores_gemma":[0.41101602,0.0009919719,0.51473534,0.0015849406,0.000044280034,0.001529695,0.022701463,0.00056450284,0.04683176],"study_design_codex":"not_applicable","study_design_gemma":"design_other","domain_scores_codex":[0.9932434,0.0013055531,0.00046257873,0.00038312114,0.0032372742,0.0013680775],"domain_scores_gemma":[0.99196905,0.0009230709,0.00047294318,0.00058621995,0.005012773,0.0010359853],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0071046078,0.0012923989,0.0006853454,0.0059952866,0.006038749,0.011312949,0.0033762066,0.0023191485,0.005692764],"category_scores_gemma":[0.0108671505,0.001439546,0.0014218342,0.0058218334,0.00231044,0.0034153163,0.0039247843,0.0022363958,0.0009831018],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021920298,0.0003925907,0.04985373,0.000657188,0.00042738553,0.000578417,0.0057222284,0.15242152,0.0027047636,0.28704855,0.29309186,0.20688272],"study_design_scores_gemma":[0.00013787267,0.00024122179,0.07620325,0.0012512328,0.00048126787,0.0002376696,0.017912162,0.21204366,0.007719319,0.06069403,0.62216914,0.0009092397],"about_ca_topic_score_codex":0.9698185,"about_ca_topic_score_gemma":0.98730123,"teacher_disagreement_score":0.07853046,"about_ca_system_score_codex":0.07853046,"about_ca_system_score_gemma":0.2193147,"threshold_uncertainty_score":0.56978106},"labels":[],"label_agreement":null},{"id":"W4246469733","doi":"10.1007/978-3-319-66685-3_11","title":"Construction Time","year":2017,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"IBI Group (Canada)","funders":"","keywords":"Subject (documents); Business; Breach of contract; Construction contract; Computer science; Law; Contract management; Political science; Damages; World Wide Web","score_opus":0.1122937081270975,"score_gpt":0.353443350668077,"score_spread":0.24114964254097954,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246469733","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015536438,0.0010919491,0.00607362,0.00052037375,0.00037195694,0.000023857936,0.0003325144,0.00014967802,0.9898824],"genre_scores_gemma":[0.037709184,0.002921642,0.0031210235,0.00016816062,0.00018691384,0.00006277618,0.00073759066,0.00019151195,0.9549013],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996209,0.00003901757,0.000014684233,0.00007809288,0.00020653034,0.000040839128],"domain_scores_gemma":[0.9997867,0.000032951477,0.000018427323,0.000042585158,0.000079611316,0.000039748662],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030752076,0.0005223535,0.0002034487,0.0009852021,0.0008528007,0.0025244085,0.00057898037,0.00041352143,0.14245367],"category_scores_gemma":[0.00087597704,0.00014817576,0.00025025426,0.0014183882,0.0007596666,0.0017101804,0.0011864546,0.0009348458,0.039724514],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049690647,0.000028516657,0.00040290845,0.00015035502,0.000005145592,0.000044731925,0.000766164,0.0011523827,0.0015000928,0.5086079,0.111062676,0.37622938],"study_design_scores_gemma":[0.0000018167368,0.000014036011,0.00052512856,0.000042739845,0.0000021210033,0.000038641258,0.00016360405,0.000153266,0.00027630955,0.022975791,0.9758026,0.000004028593],"about_ca_topic_score_codex":0.0030263755,"about_ca_topic_score_gemma":0.004626948,"teacher_disagreement_score":0.14245367,"about_ca_system_score_codex":0.0015767637,"about_ca_system_score_gemma":0.0016836541,"threshold_uncertainty_score":0.476555},"labels":[],"label_agreement":null},{"id":"W4247493439","doi":"10.1108/00197850910927705","title":"Performance evaluation in a matrix organization: a case study (part 3)","year":2009,"lang":"en","type":"article","venue":"Industrial and Commercial Training","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CAE (Canada); Concordia University","funders":"","keywords":"Constructive; Order (exchange); Process management; Computer science; Knowledge management; Business; Process (computing)","score_opus":0.4187309364947928,"score_gpt":0.4279005747096172,"score_spread":0.00916963821482436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4247493439","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98513734,0.00026860627,0.005169099,0.0013238422,0.00006192614,0.0004680211,0.00002813693,0.00003787357,0.0075052534],"genre_scores_gemma":[0.98794556,0.00031347023,0.0071589975,0.00024519087,0.000033277447,0.00021262608,0.000018698902,0.000027424103,0.004044604],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99406695,0.0039163567,0.00016236525,0.00031581012,0.00075668335,0.00078185304],"domain_scores_gemma":[0.99201375,0.0036746552,0.00089437555,0.00049203984,0.00089341955,0.0020317978],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005928913,0.00055916357,0.0003256481,0.0010816369,0.0065588844,0.0034803124,0.0012532258,0.0024041748,0.0027054662],"category_scores_gemma":[0.010397221,0.00031990217,0.0005819849,0.0009083654,0.002946342,0.0014306259,0.0023841497,0.0021947685,0.0005768514],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013127093,0.01894844,0.08484316,0.0011367309,0.00009845915,0.0946728,0.49626702,0.005950712,0.014107411,0.020112464,0.014447599,0.24810246],"study_design_scores_gemma":[0.00023862852,0.017746326,0.099117815,0.0010354435,0.0000920026,0.044267766,0.7059261,0.016791988,0.016499128,0.0051111295,0.09284338,0.00033030065],"about_ca_topic_score_codex":0.004918621,"about_ca_topic_score_gemma":0.010471023,"teacher_disagreement_score":0.0065588844,"about_ca_system_score_codex":0.003675218,"about_ca_system_score_gemma":0.0027736537,"threshold_uncertainty_score":0.0313555},"labels":[],"label_agreement":null},{"id":"W4247730065","doi":"10.1093/obo/9780190922481-0032","title":"Megaprojects","year":2020,"lang":"en","type":"reference-entry","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Megaproject; Scope (computer science); Function (biology); Scale (ratio); Business; Project planning; Project management; Engineering; Computer science; Geography; Systems engineering","score_opus":0.19345050009714065,"score_gpt":0.3889850565667061,"score_spread":0.19553455646956547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4247730065","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008595184,0.0017068048,0.013001966,0.003389612,0.0019392216,0.0005752975,0.009234739,0.0021927273,0.9593645],"genre_scores_gemma":[0.05988562,0.0032444624,0.017602151,0.001766314,0.0005678179,0.00069257646,0.017578347,0.002469965,0.8961928],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9960109,0.0010931441,0.00026058688,0.0003954958,0.0017212305,0.0005185963],"domain_scores_gemma":[0.9940088,0.00095488224,0.00037820765,0.0010775835,0.001950048,0.0016304149],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036222308,0.0006209426,0.00041126646,0.0027826221,0.0022578312,0.0059042866,0.0019542417,0.0010888578,0.26773688],"category_scores_gemma":[0.008303378,0.00041834638,0.00059185387,0.0044953465,0.0011768843,0.0055210507,0.0069623645,0.0014907782,0.08356443],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011092689,0.00006939655,0.0022968515,0.00044235427,0.000011351992,0.00030947552,0.0021538332,0.00033574065,0.00043243117,0.14544031,0.64690757,0.20148979],"study_design_scores_gemma":[0.0000027311958,0.000011237623,0.0006213873,0.00006217187,0.0000010292754,0.00009610174,0.0002834845,0.00003980905,0.00007981404,0.0018174489,0.9969805,0.000004419259],"about_ca_topic_score_codex":0.003227828,"about_ca_topic_score_gemma":0.0052004526,"teacher_disagreement_score":0.26773688,"about_ca_system_score_codex":0.0020543516,"about_ca_system_score_gemma":0.0040638857,"threshold_uncertainty_score":0.8956691},"labels":[],"label_agreement":null},{"id":"W4248130311","doi":"10.1007/978-1-4939-7131-2_100922","title":"Project Management Media","year":2018,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science","score_opus":0.16418989774911008,"score_gpt":0.37036410604870346,"score_spread":0.20617420829959338,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248130311","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0004486116,0.0015759708,0.002601071,0.001201339,0.0005705497,0.000020269472,0.0001326934,0.00019583097,0.99325365],"genre_scores_gemma":[0.0076879123,0.003161967,0.0013310042,0.000554145,0.00071780966,0.00006360963,0.00029028486,0.00026032113,0.985933],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99939215,0.00012440432,0.00002034788,0.000068273606,0.00032864502,0.000066145985],"domain_scores_gemma":[0.9994056,0.00020066673,0.000030448997,0.00010156783,0.00017289945,0.000088763925],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059538573,0.00082388526,0.00031425094,0.0028510059,0.0019176232,0.009528028,0.0010440412,0.0012347061,0.21483226],"category_scores_gemma":[0.0021310283,0.0003190393,0.00025873163,0.0031437774,0.0012106167,0.008869326,0.0035400551,0.001823814,0.07064087],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029056284,0.000045298428,0.00010012795,0.00018314205,0.0000033373274,0.000084289335,0.0012284277,0.00020350805,0.00078010414,0.22040603,0.4184018,0.35853493],"study_design_scores_gemma":[0.0000017171855,0.0000034548382,0.00008945232,0.00011332079,0.0000013488013,0.000035569257,0.0002643647,0.00008646408,0.00017376343,0.010681234,0.98854595,0.0000034233296],"about_ca_topic_score_codex":0.0022166744,"about_ca_topic_score_gemma":0.003194189,"teacher_disagreement_score":0.21483226,"about_ca_system_score_codex":0.0016244906,"about_ca_system_score_gemma":0.0014391883,"threshold_uncertainty_score":0.7186855},"labels":[],"label_agreement":null},{"id":"W4248454516","doi":"10.1061/9780784413517.230","title":"Current State of Interface Management in Mega-construction Projects","year":2014,"lang":"en","type":"article","venue":"Construction Research Congress 2014","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Deliverable; Project management; Integrated project delivery; Interface (matter); Project management triangle; Business; Construction management; Project team; Extreme project management; Program management; Best practice; Process (computing); Mega-; Project portfolio management; Pre-construction services; Process management; OPM3; Computer science; Knowledge management; Engineering; Systems engineering; Civil engineering; Management","score_opus":0.136750887562097,"score_gpt":0.45433592263060907,"score_spread":0.3175850350685121,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248454516","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7721408,0.10508966,0.040369615,0.012422687,0.00014988663,0.000227976,0.0005300275,0.00043766212,0.068631835],"genre_scores_gemma":[0.9523836,0.0306296,0.013377817,0.00032679894,0.00007062039,0.00016698884,0.00034367415,0.00004347896,0.002657413],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.98518294,0.0042519206,0.0018035255,0.0020123324,0.0057767304,0.000972448],"domain_scores_gemma":[0.9657088,0.009664429,0.011340338,0.002317082,0.008962488,0.0020069315],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009599378,0.00055455125,0.00068582495,0.004751762,0.0014146024,0.008647268,0.0039971485,0.0018383153,0.0033976117],"category_scores_gemma":[0.019556401,0.00079973444,0.00043673947,0.0096054915,0.0037987677,0.005570802,0.0038423063,0.0010807089,0.0009794473],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019038697,0.0002991385,0.11682067,0.0032934798,0.00007177846,0.0002859901,0.018688554,0.0028774731,0.0028686489,0.01839737,0.0029388457,0.8332676],"study_design_scores_gemma":[0.000039301558,0.0011725385,0.5681912,0.007372635,0.00018706787,0.0018454383,0.11959421,0.011233415,0.007266242,0.020020612,0.26273072,0.00034667598],"about_ca_topic_score_codex":0.0060602473,"about_ca_topic_score_gemma":0.0054243007,"teacher_disagreement_score":0.009599378,"about_ca_system_score_codex":0.0035421667,"about_ca_system_score_gemma":0.0048400094,"threshold_uncertainty_score":0.050766945},"labels":[],"label_agreement":null},{"id":"W4248595812","doi":"10.12927/cjnl.2012.22813","title":"80/20 Projects: Introduction","year":2012,"lang":"en","type":"article","venue":"Nursing leadership","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Workplace Health, Safety and Compensation Commission","funders":"","keywords":"Nursing; Psychology; Sociology; Medicine","score_opus":0.47300084461782815,"score_gpt":0.3927471853539946,"score_spread":0.08025365926383354,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248595812","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017965589,0.0023550724,0.022777066,0.014016205,0.0074961735,0.0036275939,0.0144953085,0.006405781,0.9108612],"genre_scores_gemma":[0.040193904,0.0024379145,0.022988763,0.002193032,0.0022434993,0.0023474188,0.00787344,0.001482174,0.91823965],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983582,0.00028588012,0.00010097286,0.00016640958,0.00079188164,0.00029662208],"domain_scores_gemma":[0.996606,0.00028519885,0.00020887473,0.00028796107,0.0012441647,0.0013678321],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033848383,0.0006615127,0.00029316175,0.0015918344,0.0011780339,0.003991552,0.0009788559,0.001419929,0.1424648],"category_scores_gemma":[0.0035125045,0.0003851468,0.00034008065,0.0019105442,0.00064817123,0.0014370196,0.0029907867,0.0015683456,0.08084333],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022019586,0.00031682904,0.0015622916,0.000523734,0.000004342309,0.00008901759,0.00050376327,0.00038125963,0.0017065275,0.018185485,0.6859671,0.29053947],"study_design_scores_gemma":[0.000022170587,0.00010788981,0.003491414,0.00011219675,0.0000016745397,0.00005153906,0.00014122155,0.00009287344,0.00040277338,0.002107223,0.9934587,0.000010442594],"about_ca_topic_score_codex":0.0017802184,"about_ca_topic_score_gemma":0.0047444454,"teacher_disagreement_score":0.1424648,"about_ca_system_score_codex":0.0014020983,"about_ca_system_score_gemma":0.003258439,"threshold_uncertainty_score":0.47659224},"labels":[],"label_agreement":null},{"id":"W4249330197","doi":"10.1002/9781118928806.ch5","title":"Practitioners","year":2017,"lang":"en","type":"other","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Milestone; Reuse; Engineering; Variety (cybernetics); Process (computing); Reputation; Principal (computer security); Engineering management; Studio; Process management; Business; Computer science; Sociology; Geography","score_opus":0.1433076445860662,"score_gpt":0.4340103548045862,"score_spread":0.29070271021852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249330197","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008842093,0.005157063,0.012385901,0.045417942,0.0025071441,0.0003489575,0.00040724684,0.0004073564,0.9245264],"genre_scores_gemma":[0.04486518,0.0060279225,0.011562534,0.023574064,0.0004556328,0.00035440447,0.0005658989,0.00033207095,0.91226226],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99349266,0.0020103015,0.00029530007,0.00090460805,0.0020569735,0.0012402086],"domain_scores_gemma":[0.99122447,0.0014105729,0.0003624674,0.0009939871,0.0031407827,0.0028676158],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.007026502,0.0006621766,0.00049457286,0.0019529976,0.0055653816,0.007813164,0.001882762,0.004658432,0.24942684],"category_scores_gemma":[0.013941794,0.0005502121,0.00046560768,0.002955006,0.002881025,0.007285014,0.007220677,0.0043972456,0.11488485],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005566735,0.00022576896,0.002357583,0.0005127662,0.000007324188,0.00047725695,0.01509305,0.00021798704,0.0011637328,0.19443548,0.5561409,0.22931252],"study_design_scores_gemma":[0.000005318013,0.000015111428,0.00029616992,0.00016536597,0.0000011489136,0.0002173562,0.005002493,0.00006502559,0.00006308239,0.0072562257,0.986907,0.00000568801],"about_ca_topic_score_codex":0.0038217544,"about_ca_topic_score_gemma":0.00861534,"teacher_disagreement_score":0.75057316,"about_ca_system_score_codex":0.0049071843,"about_ca_system_score_gemma":0.011754567,"threshold_uncertainty_score":0.8344159},"labels":[],"label_agreement":null},{"id":"W4249731435","doi":"10.1061/(asce)co.1943-7862.0000173","title":"Discussion of “Time-Profit Trade-Off Analysis for Construction Projects” by Ahmed Senouci and Khaled El-Rayes","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Profit (economics); Economics; Operations research; Mathematical economics; Microeconomics; Mathematics","score_opus":0.014128386014970956,"score_gpt":0.27585831286288826,"score_spread":0.2617299268479173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249731435","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07116412,0.025755463,0.32228512,0.32967404,0.00482323,0.00023895844,0.0005811189,0.00019752067,0.24528041],"genre_scores_gemma":[0.92053366,0.0071841003,0.022670994,0.011837555,0.0040067458,0.00019099198,0.00012357128,0.00013436528,0.033317853],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9964095,0.0020001489,0.0001517602,0.0003156578,0.0007848893,0.00033797385],"domain_scores_gemma":[0.9912163,0.007290965,0.00032405864,0.00017515045,0.0008461834,0.00014743647],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005155596,0.00084787793,0.0011962155,0.001312402,0.0018085007,0.005820884,0.002553107,0.007402022,0.01160633],"category_scores_gemma":[0.015181375,0.00057467417,0.0024590795,0.0021839058,0.0034121156,0.0064610373,0.0018333985,0.006371732,0.0007075628],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007520434,0.000047426805,0.00034937798,0.00014518706,0.000046944948,0.0003100108,0.00023467709,0.025567614,0.00031361933,0.9468503,0.015180023,0.010879663],"study_design_scores_gemma":[0.000029330957,0.00007257516,0.000899928,0.00020632075,0.000047428435,0.00015804639,0.000620472,0.059980698,0.00045537698,0.8976293,0.039835468,0.00006508866],"about_ca_topic_score_codex":0.0047633513,"about_ca_topic_score_gemma":0.0041694604,"teacher_disagreement_score":0.01160633,"about_ca_system_score_codex":0.004234518,"about_ca_system_score_gemma":0.0022283716,"threshold_uncertainty_score":0.03882706},"labels":[],"label_agreement":null},{"id":"W4252317289","doi":"10.2139/ssrn.1787014","title":"Maturity Rationing","year":2011,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kellogg's (Canada)","funders":"","keywords":"Maturity (psychological); Business; Political science; Law","score_opus":0.08193273013725352,"score_gpt":0.32938093911088706,"score_spread":0.24744820897363354,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4252317289","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1771222,0.0028771134,0.26690695,0.0035877146,0.00051196927,0.00044019247,0.00062848197,0.0012698591,0.54665554],"genre_scores_gemma":[0.867898,0.00073090283,0.037484482,0.0004248198,0.00013121036,0.00014867613,0.00023942639,0.00025940957,0.09268311],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99743915,0.00056146167,0.00016356555,0.0005508578,0.0007983359,0.0004866271],"domain_scores_gemma":[0.9948965,0.0013514095,0.0007066658,0.0010869412,0.0013822749,0.00057625584],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032758648,0.0005067207,0.00047786208,0.0020852578,0.0010894005,0.0036321436,0.0010515307,0.0013467028,0.037427787],"category_scores_gemma":[0.014416591,0.0003831946,0.00062175473,0.0016666609,0.0006838966,0.004793265,0.0022735416,0.0021760738,0.005263371],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035406149,0.0001760973,0.005627257,0.00022904914,0.00005084707,0.00024425826,0.00068384374,0.006038974,0.019775294,0.61832607,0.006337992,0.3421562],"study_design_scores_gemma":[0.0001656207,0.0011822417,0.026875371,0.0004218449,0.00017543638,0.0018359651,0.001672595,0.06912289,0.047732826,0.5359747,0.31465322,0.00018735258],"about_ca_topic_score_codex":0.0012398945,"about_ca_topic_score_gemma":0.0013228065,"teacher_disagreement_score":0.037427787,"about_ca_system_score_codex":0.0021787114,"about_ca_system_score_gemma":0.0020796817,"threshold_uncertainty_score":0.12520844},"labels":[],"label_agreement":null},{"id":"W4253478048","doi":"10.1177/875697280403500304","title":"Through the Looking Glass: Examining Theory Development in Project Management with the Resource-Based View Lens","year":2004,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"","keywords":"Terminology; Project management; Process (computing); Empirical research; Resource (disambiguation); Management science; Knowledge management; Competitive advantage; Development theory; Asset (computer security); Computer science; Process management; Business; Engineering; Epistemology; Systems engineering; Economics; Marketing","score_opus":0.10225378115242394,"score_gpt":0.3382056355158556,"score_spread":0.23595185436343163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4253478048","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30170116,0.018049136,0.45072034,0.05286466,0.00083748496,0.0012732691,0.00012207177,0.00023704843,0.17419483],"genre_scores_gemma":[0.8423554,0.0042464593,0.1474783,0.0020868923,0.0000783456,0.0009578597,0.00006203093,0.00010085614,0.0026339432],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9272108,0.065042295,0.0011451908,0.001706467,0.0035189793,0.0013762291],"domain_scores_gemma":[0.80651146,0.17799069,0.0043820753,0.0042523737,0.005092326,0.0017711525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.07608817,0.0012123539,0.0010520007,0.01184094,0.010271525,0.016968463,0.0034452577,0.0036811677,0.0030924382],"category_scores_gemma":[0.07985586,0.0012099232,0.0015728807,0.009426868,0.05455583,0.026794698,0.012448704,0.0071720425,0.00038418602],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037748014,0.000117344025,0.0029554171,0.00052103563,0.000035935722,0.00041231347,0.16870704,0.00093727396,0.0003921626,0.78257203,0.0012780753,0.04203361],"study_design_scores_gemma":[0.00006174725,0.00019830345,0.0025684591,0.0024335235,0.00006104265,0.00031799116,0.16492304,0.0057119783,0.0008734843,0.7989211,0.02387411,0.00005522491],"about_ca_topic_score_codex":0.0071711554,"about_ca_topic_score_gemma":0.0069724037,"teacher_disagreement_score":0.07608817,"about_ca_system_score_codex":0.015472595,"about_ca_system_score_gemma":0.019043531,"threshold_uncertainty_score":0.4023975},"labels":[],"label_agreement":null},{"id":"W4254407949","doi":"10.29173/mocs189","title":"A National Multilevel Analytical Research Agenda to support Integrated Construction Supply Chains for Offsite Housing Systems","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"RMIT University","keywords":"Supply chain; Panacea (medicine); SAFER; Built environment; Business; Research program; Engineering; Engineering management; Marketing; Civil engineering; Computer science","score_opus":0.3124211905745741,"score_gpt":0.4312466023855266,"score_spread":0.11882541181095246,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4254407949","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12531103,0.010577304,0.14737217,0.3320871,0.001886132,0.0030951435,0.0010202033,0.00062074716,0.37803012],"genre_scores_gemma":[0.65358317,0.012678408,0.26505184,0.01532743,0.00032697673,0.0020683408,0.0016617231,0.00021796243,0.049084134],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9905591,0.00463895,0.00040340231,0.0007311307,0.001755955,0.0019115706],"domain_scores_gemma":[0.98043936,0.004558853,0.0011494135,0.0018147919,0.008160763,0.0038769078],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01843548,0.00051312556,0.0006406777,0.0023629025,0.00639865,0.017054083,0.0029932316,0.0041251495,0.014738477],"category_scores_gemma":[0.016167756,0.0005671589,0.0013458661,0.0034632275,0.0039041818,0.015905533,0.014262352,0.005337886,0.0021378847],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007417,0.0006769843,0.015094677,0.0032999103,0.000121701145,0.0009106936,0.026793228,0.0075442293,0.003492126,0.6837516,0.05581541,0.20242533],"study_design_scores_gemma":[0.000025261861,0.00027454057,0.015449272,0.006299583,0.00010632041,0.0002724267,0.08735106,0.0153785,0.00174743,0.27060303,0.6024195,0.00007305295],"about_ca_topic_score_codex":0.036153127,"about_ca_topic_score_gemma":0.091828875,"teacher_disagreement_score":0.036153127,"about_ca_system_score_codex":0.02048999,"about_ca_system_score_gemma":0.10445683,"threshold_uncertainty_score":0.14866596},"labels":[],"label_agreement":null},{"id":"W4255580368","doi":"10.12927/cjnl.2012.22806","title":"Skills Upgrading Projects: Introduction","year":2012,"lang":"en","type":"article","venue":"Nursing leadership","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Psychology; Nursing; Medical education; Political science; Business; Medicine","score_opus":0.3879710695753157,"score_gpt":0.3886815646929409,"score_spread":0.0007104951176252206,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255580368","genre_codex":"other","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08213511,0.09916927,0.16137499,0.06763103,0.010859823,0.0022968077,0.0021443462,0.001873533,0.5725152],"genre_scores_gemma":[0.43400404,0.118606105,0.16872239,0.01415087,0.010391348,0.003409151,0.0025160995,0.00061829755,0.24758165],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.998711,0.00045741737,0.00014034577,0.00014868079,0.00039801528,0.0001445828],"domain_scores_gemma":[0.9973308,0.0011028831,0.00026127035,0.00014670621,0.00068120315,0.00047701196],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002489237,0.0008119201,0.00036911955,0.0018425375,0.0009014914,0.0043600528,0.0009710671,0.0021954388,0.010911108],"category_scores_gemma":[0.0033694506,0.00046657582,0.00036458104,0.0025797628,0.0015672797,0.0035279787,0.0029130632,0.0023699428,0.002690474],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007835054,0.00056254334,0.004922,0.0025246125,0.000010340146,0.00020059096,0.0031374742,0.0023273998,0.0015272801,0.12204136,0.06930198,0.793366],"study_design_scores_gemma":[0.000022962893,0.00041842632,0.016545018,0.0019913195,0.000009469169,0.0003588279,0.0037005688,0.0016975082,0.0010630573,0.04998639,0.9241533,0.000053173455],"about_ca_topic_score_codex":0.0013572134,"about_ca_topic_score_gemma":0.0028302048,"teacher_disagreement_score":0.010911108,"about_ca_system_score_codex":0.0015704647,"about_ca_system_score_gemma":0.0026308345,"threshold_uncertainty_score":0.03650129},"labels":[],"label_agreement":null},{"id":"W4256636836","doi":"10.1108/00197850810900048","title":"Performance evaluation in a matrix organization: a case study (Part Two)","year":2008,"lang":"en","type":"article","venue":"Industrial and Commercial Training","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CAE (Canada); Concordia University","funders":"","keywords":"Constructive; Originality; Computer science; Value (mathematics); Process management; Matrix (chemical analysis); Knowledge management; Management science; Psychology; Business; Engineering; Process (computing); Social psychology","score_opus":0.5185269138112607,"score_gpt":0.4297298399891939,"score_spread":0.08879707382206681,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4256636836","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98032284,0.0002567511,0.008102357,0.0011114381,0.00005344285,0.0007205664,0.000033596996,0.00003293354,0.009366132],"genre_scores_gemma":[0.9807458,0.0003216063,0.013373083,0.00015931268,0.000032740427,0.0003781993,0.000026001848,0.000021684165,0.004941611],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99217075,0.0056014997,0.00021280804,0.00036397722,0.0009413905,0.0007096383],"domain_scores_gemma":[0.9895064,0.005792895,0.0011579609,0.0007284544,0.0013054465,0.001508816],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006823603,0.0004999395,0.00030768703,0.0011947311,0.0042010807,0.0032002556,0.0011207744,0.0020991205,0.0025834427],"category_scores_gemma":[0.012560861,0.00030405563,0.00040684044,0.0009846719,0.0023318888,0.0015816934,0.0021647154,0.0016021156,0.00044062204],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021592174,0.020494385,0.08925916,0.0014513824,0.00011610588,0.06607366,0.36531958,0.011933427,0.016527338,0.037736967,0.016793707,0.37213516],"study_design_scores_gemma":[0.0004777464,0.026476167,0.11072578,0.0014201571,0.00012531252,0.044830758,0.6093214,0.035380542,0.027348688,0.008697613,0.13474764,0.00044814835],"about_ca_topic_score_codex":0.0031530573,"about_ca_topic_score_gemma":0.006806033,"teacher_disagreement_score":0.006823603,"about_ca_system_score_codex":0.0035203625,"about_ca_system_score_gemma":0.0020869183,"threshold_uncertainty_score":0.036087096},"labels":[],"label_agreement":null},{"id":"W4280617256","doi":"10.54878/ijadt.167","title":"Implementation of Electronic Tendering in Malaysian Construction Industry: A Case Study In The Preparation and Application of E-Tendering","year":2022,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Procurement; Business; Productivity; E-procurement; Construction industry; Process (computing); Phase (matter); Industrial organization; Operations management; Process management; Marketing; Computer science; Engineering; Construction engineering; Economics; Economic growth","score_opus":0.052794112678240364,"score_gpt":0.4084162734106842,"score_spread":0.35562216073244385,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4280617256","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99419254,0.000074005155,0.00075742806,0.00023718445,0.000004808326,0.000089471214,0.000013230057,0.000005272303,0.0046259603],"genre_scores_gemma":[0.996223,0.00017098789,0.0013925459,0.00004759156,0.000004503268,0.000026431182,0.00001448667,0.0000037774703,0.002116634],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99646,0.0019508555,0.00015619045,0.00017778698,0.0005407303,0.0007143868],"domain_scores_gemma":[0.9954407,0.0022982275,0.00079317094,0.0002275153,0.0005477012,0.0006926669],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046161297,0.00031294147,0.00024908,0.000683266,0.002578205,0.0019436548,0.0012772602,0.0016927344,0.0017970727],"category_scores_gemma":[0.0043479395,0.00034277624,0.000319025,0.0010519872,0.0017453517,0.0012296395,0.0012910787,0.0011592639,0.00027735662],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018611103,0.0200285,0.24327351,0.0016794532,0.00014616257,0.10408426,0.20784642,0.05223309,0.026069816,0.034489717,0.006262024,0.30202597],"study_design_scores_gemma":[0.00026895353,0.010128004,0.2788949,0.0009647785,0.00013628782,0.015101011,0.5434351,0.061534904,0.021674607,0.0038846938,0.063695505,0.0002813381],"about_ca_topic_score_codex":0.007982065,"about_ca_topic_score_gemma":0.019749416,"teacher_disagreement_score":0.007982065,"about_ca_system_score_codex":0.0033868141,"about_ca_system_score_gemma":0.0028872176,"threshold_uncertainty_score":0.024573147},"labels":[],"label_agreement":null},{"id":"W4281391534","doi":"10.1108/bepam-12-2021-0150","title":"The new-normal challenges and IPD solutions: a Canadian case study","year":2022,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure; Polytechnique Montréal","funders":"","keywords":"Originality; Context (archaeology); Knowledge management; Process management; Project management; Management science; Computer science; Engineering; Sociology; Qualitative research; Systems engineering; Geography","score_opus":0.1087610256947582,"score_gpt":0.3220051485567991,"score_spread":0.21324412286204092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281391534","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8750284,0.0022515648,0.0061097243,0.010495068,0.0001775045,0.0015685363,0.00087910285,0.00006516613,0.10342486],"genre_scores_gemma":[0.9725475,0.0027059903,0.007716221,0.0008735447,0.000019680452,0.00041148995,0.00020376458,0.000033892236,0.015487834],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99277663,0.002316637,0.00019181872,0.00045033253,0.001981018,0.0022835557],"domain_scores_gemma":[0.9947935,0.0013923106,0.0003661352,0.00034753766,0.0016230667,0.0014775062],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005284248,0.00077556947,0.0005885614,0.0028890357,0.027226945,0.005228234,0.0032803814,0.0033034142,0.005292034],"category_scores_gemma":[0.0083745355,0.00051715213,0.00071229396,0.006611837,0.0072979233,0.0020002564,0.0049571525,0.0026217776,0.00043303522],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00059605227,0.0013786544,0.079257786,0.0019843187,0.000098307326,0.07761433,0.5095752,0.012063801,0.0045435457,0.12239578,0.051499255,0.13899314],"study_design_scores_gemma":[0.00007067739,0.0003366031,0.03666134,0.0008708446,0.00008049304,0.005393699,0.6671009,0.005004301,0.0013603048,0.0045181927,0.27840948,0.00019312627],"about_ca_topic_score_codex":0.954416,"about_ca_topic_score_gemma":0.97956043,"teacher_disagreement_score":0.08745574,"about_ca_system_score_codex":0.08745574,"about_ca_system_score_gemma":0.115477756,"threshold_uncertainty_score":0.63453877},"labels":[],"label_agreement":null},{"id":"W4283801114","doi":"10.1061/(asce)me.1943-5479.0001071","title":"Managing Interdependence-Induced Systemic Risks in Infrastructure Projects","year":2022,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Operationalization; Risk analysis (engineering); Risk management; Systemic risk; Project management; Process management; Performance indicator; Critical infrastructure; Resilience (materials science); Interdependence; Business; Schedule; Identification (biology); General partnership; Computer science; Systems engineering; Engineering; Economics","score_opus":0.06390578444886319,"score_gpt":0.33313748326927123,"score_spread":0.26923169882040804,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283801114","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5495758,0.00032072992,0.44522825,0.00032218013,0.000015348756,0.00020823785,0.00004937013,0.0000590214,0.0042211176],"genre_scores_gemma":[0.97902006,0.0001406182,0.02046112,0.000009800992,0.0000045507704,0.00006984818,0.000018412331,0.000008156814,0.00026751426],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9954432,0.002892544,0.00016947775,0.00041091014,0.00074033235,0.00034352674],"domain_scores_gemma":[0.98873,0.0073631327,0.0024185148,0.00044566012,0.00071336835,0.00032939686],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0067511355,0.000865484,0.000525664,0.0018327537,0.00074065384,0.0023612867,0.00087800104,0.0009493039,0.00068095885],"category_scores_gemma":[0.015846923,0.0005660162,0.00052689423,0.001440041,0.0012237984,0.002071359,0.0027221409,0.00090327894,0.000052618543],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000075215874,0.00012397405,0.016428864,0.000112234215,0.0001332907,0.0003833936,0.0004963218,0.92946833,0.0029411875,0.01868758,0.0001673108,0.030982213],"study_design_scores_gemma":[0.000011814101,0.00023046213,0.00954389,0.00005330848,0.00006412678,0.00015479166,0.00069578877,0.9601011,0.0017146682,0.026579898,0.0008136134,0.000036578436],"about_ca_topic_score_codex":0.0024746705,"about_ca_topic_score_gemma":0.0031981207,"teacher_disagreement_score":0.0067511355,"about_ca_system_score_codex":0.0016618557,"about_ca_system_score_gemma":0.0020954271,"threshold_uncertainty_score":0.035703838},"labels":[],"label_agreement":null},{"id":"W4285105273","doi":"10.5267/j.jpm.2022.5.003","title":"Modeling of organizing function management in Vietnam’s public construction works","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Knowledge management; Function (biology); Structural equation modeling; Authorization; Work (physics); Process management; Computer science; Business; Engineering; Machine learning","score_opus":0.09507896889605932,"score_gpt":0.3343438774042073,"score_spread":0.23926490850814797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285105273","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94471943,0.00024232232,0.036254816,0.00053584244,0.000022198787,0.0001407069,0.0002471135,0.000070376715,0.017767191],"genre_scores_gemma":[0.9937603,0.00019034746,0.0030591858,0.000009333122,0.0000051951106,0.00008292026,0.0000967312,0.000008989024,0.0027869828],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9994979,0.0002185818,0.000019482839,0.000080943944,0.000063829764,0.00011917773],"domain_scores_gemma":[0.9993543,0.00033533695,0.00010821579,0.000020780939,0.000090665664,0.000090731926],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009907235,0.0004834655,0.00027931583,0.000920857,0.0007024723,0.001925509,0.0009871908,0.0006464759,0.003188278],"category_scores_gemma":[0.001329634,0.00033773284,0.00048761445,0.00073990424,0.00061386696,0.000752627,0.0007497093,0.0004943909,0.00020322496],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012419293,0.0005656283,0.12225707,0.00018244874,0.00010368853,0.0012033139,0.005342373,0.8003968,0.0015168181,0.044591144,0.0017021856,0.0220144],"study_design_scores_gemma":[0.000013947499,0.00008732546,0.021200046,0.000038646955,0.000026105163,0.000057540925,0.0022928473,0.9703447,0.00017331252,0.003391113,0.002357149,0.000017276392],"about_ca_topic_score_codex":0.065721124,"about_ca_topic_score_gemma":0.040926524,"teacher_disagreement_score":0.065721124,"about_ca_system_score_codex":0.0028465742,"about_ca_system_score_gemma":0.0038096283,"threshold_uncertainty_score":0.13067716},"labels":[],"label_agreement":null},{"id":"W4285133593","doi":"10.2139/ssrn.4121748","title":"Project Networks and Reallocation Externalities","year":2022,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; University of British Columbia; York University","funders":"","keywords":"Externality; Business; Economics; Microeconomics","score_opus":0.043149652019573465,"score_gpt":0.33285569528964726,"score_spread":0.28970604327007377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285133593","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8112976,0.001157496,0.018290797,0.004526735,0.000043998098,0.00009966147,0.0004933876,0.00006133206,0.16402891],"genre_scores_gemma":[0.99389344,0.0004214098,0.00040449048,0.000048466398,0.00002260624,0.000025906591,0.000046214154,0.0000065594636,0.005130812],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99877304,0.00059370097,0.000062976076,0.00013569054,0.00019221414,0.00024236168],"domain_scores_gemma":[0.9757627,0.014774408,0.0058826343,0.0006681934,0.0012513641,0.0016606648],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027008757,0.00029390334,0.00040806158,0.0022758534,0.0006188921,0.003369292,0.0004347349,0.0012690339,0.01834415],"category_scores_gemma":[0.01949306,0.00024768754,0.00027434062,0.0031285554,0.0018779659,0.0047002276,0.0023036716,0.0008605841,0.0006248727],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011809429,0.000528102,0.17246194,0.0003489238,0.00027621313,0.0007840296,0.0013081785,0.16556868,0.0013016613,0.5695648,0.0049808305,0.081695706],"study_design_scores_gemma":[0.0002295268,0.00042896983,0.19973017,0.0004095621,0.0002757252,0.00062862283,0.009119214,0.07314131,0.0010407731,0.68369555,0.031223135,0.000077398545],"about_ca_topic_score_codex":0.002381744,"about_ca_topic_score_gemma":0.0044878884,"teacher_disagreement_score":0.01834415,"about_ca_system_score_codex":0.002528593,"about_ca_system_score_gemma":0.001181413,"threshold_uncertainty_score":0.061367333},"labels":[],"label_agreement":null},{"id":"W4289293032","doi":"10.5281/zenodo.1484650","title":"Deterministic Project Management With Ai Applicability In Globalized Context","year":2018,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Context (archaeology); Computer science; Management science; Data science; Knowledge management; Artificial intelligence; Operations research; Engineering; Geography","score_opus":0.08783320739379982,"score_gpt":0.35161740209074804,"score_spread":0.26378419469694825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4289293032","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11768959,0.0013468973,0.86330724,0.00097422703,0.000055369695,0.000104748266,0.00007437673,0.00028937677,0.01615809],"genre_scores_gemma":[0.9126943,0.00059139164,0.08521451,0.000052890227,0.000039910698,0.00009544341,0.000054478875,0.000028778142,0.0012282977],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9967528,0.0014868364,0.00014819285,0.00070143316,0.00065712753,0.00025368054],"domain_scores_gemma":[0.9946812,0.0026245795,0.0011040834,0.00090481836,0.00043194366,0.00025343883],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029995136,0.0005495619,0.0006918638,0.00095485,0.0006583049,0.0034280594,0.00090078224,0.00059026864,0.001520093],"category_scores_gemma":[0.006212307,0.00033141792,0.00045860722,0.0012951357,0.0023444926,0.002304112,0.0033604489,0.0013289751,0.00023487119],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012687415,0.00010139463,0.010552638,0.00037723224,0.00012981502,0.0004196593,0.0012461072,0.5510277,0.0039564585,0.26456156,0.0011052265,0.16639528],"study_design_scores_gemma":[0.00003209401,0.0002550889,0.005457673,0.00010193135,0.00005773689,0.00016411577,0.00088462926,0.6881647,0.0018198342,0.2914319,0.011577233,0.00005314529],"about_ca_topic_score_codex":0.0020519726,"about_ca_topic_score_gemma":0.0025948035,"teacher_disagreement_score":0.0034280594,"about_ca_system_score_codex":0.0014314211,"about_ca_system_score_gemma":0.002006076,"threshold_uncertainty_score":0.01586312},"labels":[],"label_agreement":null},{"id":"W4293068753","doi":"10.1080/01446193.2022.2110273","title":"Twenty-year application of logistics and supply chain management in the construction industry","year":2022,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Supply chain management; Procurement; Supply chain; Construction industry; Construction management; Process management; Business; Computer science; Operations management; Knowledge management; Engineering; Construction engineering; Marketing; Civil engineering","score_opus":0.040273095512723366,"score_gpt":0.2837457886716672,"score_spread":0.24347269315894385,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293068753","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06902246,0.8479823,0.022858659,0.015676282,0.002352001,0.00049281673,0.0009956937,0.000085210755,0.040534586],"genre_scores_gemma":[0.35248175,0.5967847,0.036979575,0.004076175,0.0009903689,0.0006536111,0.00093209586,0.000059739104,0.007042018],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9832323,0.0067845313,0.0031306995,0.00140013,0.0049711424,0.00048121164],"domain_scores_gemma":[0.9360025,0.035613388,0.008624363,0.0024593263,0.016172037,0.0011284751],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020750143,0.0005501686,0.0007576405,0.016994357,0.0018971711,0.0065840995,0.0010667051,0.0019875208,0.0033262037],"category_scores_gemma":[0.037582275,0.00050967315,0.0010149016,0.024912596,0.0028205668,0.0053286455,0.0034711328,0.0016007312,0.0004823262],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020614585,0.00013448711,0.029718343,0.029629976,0.00040902602,0.0005844111,0.014563203,0.0020545684,0.0029845426,0.07838183,0.0090569025,0.8322766],"study_design_scores_gemma":[0.000021503574,0.00062831515,0.10976789,0.046112474,0.00048247655,0.0014600623,0.026310502,0.0018524571,0.0053253826,0.02724905,0.7805298,0.0002601257],"about_ca_topic_score_codex":0.010199398,"about_ca_topic_score_gemma":0.026698979,"teacher_disagreement_score":0.020750143,"about_ca_system_score_codex":0.012706127,"about_ca_system_score_gemma":0.02611404,"threshold_uncertainty_score":0.10973859},"labels":[],"label_agreement":null},{"id":"W4293254958","doi":"10.4324/9781003257172","title":"The Front-end of Large Public Projects","year":2022,"lang":"en","type":"book","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Montréal","funders":"Technische Universiteit Delft; Universiteit van Amsterdam; Economic and Social Research Council; Department of Defence, Australian Government; Australian National University; Health and Safety Executive; Universiteit Utrecht; University of Manchester; Université du Québec à Montréal; British Academy of Management; Government of the United Kingdom","keywords":"Front (military); Front and back ends; Political science; Computer science; Geography; Meteorology; Operating system","score_opus":0.10420536028041233,"score_gpt":0.3476809689203659,"score_spread":0.24347560863995354,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293254958","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010303647,0.002036923,0.014030008,0.0023230657,0.00032853195,0.00011230339,0.0001565606,0.00037554608,0.9703334],"genre_scores_gemma":[0.11597827,0.003249792,0.010791092,0.00066577387,0.00017692502,0.00011146662,0.00037090134,0.00032580367,0.86833],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9985398,0.00032702344,0.000033135686,0.00015498078,0.00073366426,0.00021154834],"domain_scores_gemma":[0.99917054,0.0003236114,0.00006094865,0.00014911765,0.00014687427,0.00014895774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090018415,0.0004494264,0.0003244612,0.0008498601,0.002630668,0.009826167,0.00088680733,0.0015026146,0.060141075],"category_scores_gemma":[0.002482605,0.0004151228,0.00034385372,0.0013632741,0.0017610866,0.0056467424,0.0035828773,0.0017431239,0.019996095],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008664724,0.00017434453,0.0010397237,0.00031040848,0.0000076235865,0.00082736684,0.008097791,0.0019141329,0.002173577,0.377384,0.24157228,0.3664122],"study_design_scores_gemma":[0.000005168935,0.000038512673,0.0011045343,0.00024133429,0.0000021905355,0.00030401556,0.0039191176,0.00097045914,0.00045613822,0.023582468,0.96936274,0.000013443456],"about_ca_topic_score_codex":0.0031404241,"about_ca_topic_score_gemma":0.0063898405,"teacher_disagreement_score":0.060141075,"about_ca_system_score_codex":0.0018444556,"about_ca_system_score_gemma":0.0018261612,"threshold_uncertainty_score":0.2011919},"labels":[],"label_agreement":null},{"id":"W4294733248","doi":"10.1177/87569728221118342","title":"Investigating the Dynamics of Engineering Design Rework for a Complex Aircraft Development Project: Lessons Learned From a Soft Systems Thinking Lens","year":2022,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières; Université du Québec à Rimouski","funders":"Coordenação de Aperfeiçoamento de Pessoal de Nível Superior","keywords":"Rework; New product development; System dynamics; Process management; Process (computing); Soft systems methodology; Systems thinking; Systems engineering; Causal loop diagram; Product (mathematics); Engineering; Project management; Dynamics (music); Engineering management; Computer science; Business; Information system; Marketing","score_opus":0.2705357162180704,"score_gpt":0.36619951664754086,"score_spread":0.09566380042947048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4294733248","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8634658,0.0010584866,0.090609185,0.007998016,0.000058835638,0.000184858,0.00007743105,0.00006405347,0.03648331],"genre_scores_gemma":[0.98580223,0.0006133316,0.012388464,0.000093606985,0.000015177729,0.000054304157,0.000025635769,0.000016693353,0.0009905584],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.99723023,0.0016311075,0.00009690164,0.00026755861,0.00049597246,0.00027821373],"domain_scores_gemma":[0.9791622,0.015816752,0.0020750647,0.00063228764,0.0012789833,0.0010348158],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0056150393,0.0005768146,0.00038819358,0.0017557691,0.0013414539,0.005300263,0.0012314228,0.0012016784,0.0025512823],"category_scores_gemma":[0.018569756,0.0003332467,0.00040482692,0.0014014062,0.004019877,0.007008539,0.0025720738,0.0023261085,0.00021864176],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026421927,0.0015515609,0.13025515,0.00091016217,0.00016498465,0.0019079576,0.062030587,0.13950935,0.0053077927,0.5025812,0.003022444,0.15249464],"study_design_scores_gemma":[0.00007684644,0.000844158,0.075296655,0.0007761119,0.00006611739,0.00059486757,0.12209043,0.45267344,0.0025440303,0.32426432,0.020579986,0.0001930455],"about_ca_topic_score_codex":0.0059495857,"about_ca_topic_score_gemma":0.006782299,"teacher_disagreement_score":0.0059495857,"about_ca_system_score_codex":0.004132722,"about_ca_system_score_gemma":0.0040015914,"threshold_uncertainty_score":0.02998513},"labels":[],"label_agreement":null},{"id":"W4295924056","doi":"10.3390/buildings12091460","title":"Selection of New Projects Considering the Synergistic Relationships in a Project Portfolio","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Wilfrid Laurier University","funders":"Fundamental Research Funds for the Central Universities; Social Science Foundation of Shaanxi Province; National Natural Science Foundation of China","keywords":"Portfolio; Selection (genetic algorithm); Process management; Project portfolio management; Computer science; Process (computing); Engineering management; Management science; Project management; Business; Engineering; Systems engineering; Finance","score_opus":0.1728559147044203,"score_gpt":0.3573699291843471,"score_spread":0.18451401447992682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4295924056","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4421576,0.00029898869,0.53660154,0.00035275856,0.000033992663,0.0004917517,0.00006648811,0.00008475718,0.019912094],"genre_scores_gemma":[0.9348461,0.0002501868,0.06212209,0.000020170757,0.000007629884,0.000253162,0.000065087115,0.000016673848,0.0024190026],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9966484,0.0015407129,0.00017331235,0.00032954995,0.0008998657,0.00040816498],"domain_scores_gemma":[0.9976705,0.0011472447,0.00037862724,0.00015259632,0.0003709058,0.00028008252],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039697615,0.0007321969,0.0008260258,0.0015666434,0.00097501546,0.0027943698,0.00087649724,0.0008357196,0.002888861],"category_scores_gemma":[0.007508189,0.0004567692,0.00084124756,0.0018409132,0.000606819,0.0024936183,0.0022223506,0.0009276024,0.00031253955],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018663477,0.0003222365,0.022776866,0.00017743548,0.0001232333,0.0006744348,0.00053363026,0.8217545,0.004941059,0.03520873,0.0007638748,0.11253735],"study_design_scores_gemma":[0.000030196828,0.00035107209,0.0034927425,0.000037997663,0.00007424782,0.00019264186,0.0005093584,0.9758782,0.0016203047,0.015653268,0.0021246932,0.000035186094],"about_ca_topic_score_codex":0.002123334,"about_ca_topic_score_gemma":0.0024020998,"teacher_disagreement_score":0.0039697615,"about_ca_system_score_codex":0.0011511644,"about_ca_system_score_gemma":0.0026110278,"threshold_uncertainty_score":0.020994365},"labels":[],"label_agreement":null},{"id":"W4296110658","doi":"10.51415/10321/4245","title":"Sustainable business strategy for small and medium enterprises in KwaZulu-Natal, South Africa","year":2022,"lang":"en","type":"dissertation","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Sustainability; Small and medium-sized enterprises; Sample (material); Population; Product (mathematics); Medium term; Business; Quarter (Canadian coin); Marketing; Economic growth; Economics; Geography; Mathematics; Finance; Sociology; Macroeconomics","score_opus":0.08086819995186616,"score_gpt":0.35244541917116073,"score_spread":0.27157721921929456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296110658","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9750841,0.0016802081,0.0012026902,0.0030393535,0.000029611425,0.00062416174,0.0001443134,0.00001572756,0.018179758],"genre_scores_gemma":[0.9905867,0.0014744818,0.0023116446,0.0001305135,0.0000046198866,0.0004907511,0.00009469918,0.0000040465347,0.0049025016],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99945194,0.00024399608,0.000052595427,0.000027181068,0.0000812629,0.00014312689],"domain_scores_gemma":[0.9992693,0.0002841765,0.00015521134,0.000021726722,0.00009491725,0.0001745877],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009884904,0.00026455245,0.00020472055,0.0008404764,0.002199507,0.0019111043,0.00042705057,0.0004513887,0.0036279713],"category_scores_gemma":[0.0025055718,0.0002673102,0.00018266439,0.0013472898,0.00055283605,0.0016936219,0.0012031312,0.00043708144,0.0004169873],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005604424,0.0018870643,0.14739402,0.0074553206,0.00010794987,0.03051436,0.26483715,0.0048662806,0.031326238,0.08113482,0.015297279,0.4146191],"study_design_scores_gemma":[0.000075073935,0.0007659287,0.33157635,0.002380295,0.00007154839,0.0026310743,0.5173075,0.005095482,0.0033268807,0.00624892,0.1304008,0.00012005983],"about_ca_topic_score_codex":0.016115805,"about_ca_topic_score_gemma":0.04629266,"teacher_disagreement_score":0.016115805,"about_ca_system_score_codex":0.0039252765,"about_ca_system_score_gemma":0.005898929,"threshold_uncertainty_score":0.032043993},"labels":[],"label_agreement":null},{"id":"W4296169950","doi":"10.29173/mocs261","title":"Development of decision-making tool for construction method selection: choosing and optimizing offsite construction","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Analytic hierarchy process; Ranking (information retrieval); Process (computing); Computer science; Quality (philosophy); Selection (genetic algorithm); Decision analysis; Construction management; Risk analysis (engineering); Engineering; Management science; Construction engineering; Systems engineering; Operations research; Artificial intelligence; Civil engineering","score_opus":0.034971622901461046,"score_gpt":0.32613620353795686,"score_spread":0.2911645806364958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296169950","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034859553,0.00021401336,0.95256865,0.00039442332,0.000044763652,0.001855585,0.00042509512,0.0014225222,0.008215402],"genre_scores_gemma":[0.074666366,0.00013734562,0.9228234,0.000041547803,0.000011167327,0.0009751558,0.00040623825,0.00008453422,0.0008541486],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98894686,0.0054908693,0.0010117083,0.0009852381,0.0030179154,0.0005474645],"domain_scores_gemma":[0.98254806,0.0099075325,0.0014371258,0.0010691562,0.0044517857,0.00058626314],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016308052,0.0023454106,0.0017002707,0.00793911,0.0015980038,0.0051366836,0.0021918037,0.00154658,0.00634201],"category_scores_gemma":[0.02363246,0.00088873896,0.0016104653,0.0034499033,0.00073884067,0.0033339919,0.0023500635,0.0015096111,0.0013871606],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005369921,0.0011191776,0.008367817,0.0017877583,0.00020759345,0.00052508025,0.0024350968,0.08456667,0.019222269,0.029464774,0.00792162,0.8438451],"study_design_scores_gemma":[0.0004117887,0.0013190829,0.008716212,0.0015452233,0.00037732825,0.0005911423,0.0038205981,0.8204394,0.05551786,0.054822594,0.052065156,0.00037372086],"about_ca_topic_score_codex":0.0013629165,"about_ca_topic_score_gemma":0.0019392929,"teacher_disagreement_score":0.016308052,"about_ca_system_score_codex":0.001913457,"about_ca_system_score_gemma":0.0059183585,"threshold_uncertainty_score":0.08624625},"labels":[],"label_agreement":null},{"id":"W4296351251","doi":"10.1108/ecam-01-2022-0009","title":"The concept of integration in an IPD context: a grounded theory review","year":2022,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Polytechnique Montréal","funders":"","keywords":"Context (archaeology); Originality; Construct (python library); Grounded theory; Conceptual blending; Dimension (graph theory); Computer science; Conceptual framework; Process management; Knowledge management; Management science; Engineering; Qualitative research; Psychology; Sociology; Cognition","score_opus":0.02766794428007901,"score_gpt":0.30285861371382927,"score_spread":0.27519066943375026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296351251","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028950322,0.6751655,0.17316502,0.046957858,0.001960095,0.0036302612,0.0009026525,0.00014277283,0.06912566],"genre_scores_gemma":[0.3014219,0.5178072,0.16616572,0.0073506143,0.0004592058,0.004019198,0.0009249525,0.00010880217,0.0017424724],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9802421,0.012450718,0.0017531213,0.0010828183,0.003918751,0.00055250566],"domain_scores_gemma":[0.9462128,0.04703262,0.0013001736,0.0012948799,0.0036647262,0.00049480784],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03153312,0.0012754531,0.0018902933,0.016371373,0.0035044225,0.010931996,0.004158062,0.0031985557,0.0025597517],"category_scores_gemma":[0.032166433,0.000889448,0.0013543409,0.01581666,0.012662929,0.011370839,0.005739801,0.0047641173,0.0005285844],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063586725,0.0002106815,0.0022605325,0.024224762,0.00012743175,0.0007100411,0.047836654,0.0017845435,0.00072172144,0.4834417,0.0072254166,0.4313929],"study_design_scores_gemma":[0.00006025486,0.00020106361,0.0044734976,0.1723684,0.00032791038,0.0011300637,0.10924407,0.0046748314,0.0015705646,0.32898155,0.37678823,0.00017955116],"about_ca_topic_score_codex":0.009112435,"about_ca_topic_score_gemma":0.007432498,"teacher_disagreement_score":0.03153312,"about_ca_system_score_codex":0.016405603,"about_ca_system_score_gemma":0.02396219,"threshold_uncertainty_score":0.1667651},"labels":[],"label_agreement":null},{"id":"W4296785998","doi":"10.1139/cjce-2021-0330","title":"Impact of Architect/Engineer (A/E) consultant qualifications on project outcomes","year":2022,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","keywords":"Procurement; Engineering management; Project manager; Project management; Engineering; Selection (genetic algorithm); Project planning; Operations management; Process management; Computer science; Business; Systems engineering; Marketing; Artificial intelligence","score_opus":0.06512601477741885,"score_gpt":0.3407587650871304,"score_spread":0.2756327503097115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296785998","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99165183,0.00008598193,0.0010992228,0.00012384007,0.0000045565844,0.000025717449,0.000041465802,0.000010110921,0.006957294],"genre_scores_gemma":[0.99908733,0.000028649203,0.00021003898,0.000008053737,0.0000012990982,0.000005104159,0.00002095445,0.000001887554,0.0006367158],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9929913,0.003343996,0.00030975637,0.00026156293,0.0017467123,0.0013465885],"domain_scores_gemma":[0.9570422,0.023570089,0.0069632237,0.0010793267,0.0063894414,0.0049557188],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0093773315,0.0003871344,0.0002711466,0.0011740207,0.00066727883,0.0019995808,0.0003595669,0.00047555842,0.0050461516],"category_scores_gemma":[0.028185891,0.00016419547,0.00027455646,0.0008879157,0.0010678087,0.00081328786,0.0014985622,0.0006499292,0.00055325514],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001502422,0.0011052873,0.73480266,0.00023508434,0.00011929104,0.0017851872,0.0023033477,0.102143064,0.0059656673,0.0028169379,0.0010522323,0.14616881],"study_design_scores_gemma":[0.00004315716,0.0020673843,0.9419976,0.00012970832,0.00007278386,0.0003723496,0.006310012,0.041050967,0.0045695216,0.0012259646,0.0020972071,0.0000633353],"about_ca_topic_score_codex":0.015312846,"about_ca_topic_score_gemma":0.025740031,"teacher_disagreement_score":0.015312846,"about_ca_system_score_codex":0.0031195648,"about_ca_system_score_gemma":0.0038629214,"threshold_uncertainty_score":0.049592674},"labels":[],"label_agreement":null},{"id":"W4297236267","doi":"10.5539/ibr.v15n10p66","title":"Success Factors in Project Management in the Financial Sector in Ghana: Screening for Construct Items","year":2022,"lang":"en","type":"article","venue":"International Business Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Niagara College","funders":"","keywords":"Variance (accounting); Business; Competence (human resources); Sample (material); Project management; Descriptive statistics; Critical success factor; Marketing; Accounting; Economics; Statistics; Management; Mathematics","score_opus":0.28906453668940957,"score_gpt":0.475359498705571,"score_spread":0.18629496201616141,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4297236267","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9981279,0.00007156996,0.00033056267,0.00012790841,0.0000034898633,0.000109364126,0.000088239074,0.000003945921,0.0011369777],"genre_scores_gemma":[0.99808806,0.00011413837,0.0013484394,0.0000109415205,0.0000024168921,0.00012262579,0.000107006315,0.0000023013854,0.0002040609],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99870193,0.00048506365,0.00017598998,0.00006578579,0.00038266994,0.00018857648],"domain_scores_gemma":[0.9874743,0.0047717583,0.0050189774,0.00038346357,0.0012610627,0.0010903903],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030644173,0.00038022493,0.0003000946,0.0019401135,0.0009372735,0.0011092209,0.00024657702,0.00023802802,0.0018192623],"category_scores_gemma":[0.013581083,0.00033383846,0.00031518287,0.002320464,0.0009236201,0.0007504462,0.0010145367,0.0004998344,0.00018834938],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033555025,0.00014087559,0.9710443,0.00011099533,0.000015454172,0.00013565003,0.005131983,0.00010285028,0.00051355595,0.0002992256,0.00027554177,0.02219598],"study_design_scores_gemma":[0.0000038072078,0.00009185896,0.9888705,0.00007286626,0.000007903975,0.000096963835,0.0094802175,0.00022074119,0.00018570536,0.0001562642,0.00080738077,0.0000057561624],"about_ca_topic_score_codex":0.004377945,"about_ca_topic_score_gemma":0.010761501,"teacher_disagreement_score":0.004377945,"about_ca_system_score_codex":0.0013004804,"about_ca_system_score_gemma":0.0027989352,"threshold_uncertainty_score":0.016206443},"labels":[],"label_agreement":null},{"id":"W4303613618","doi":"10.3390/buildings12101608","title":"Improvisation in Construction Planning: An Agent-Based Simulation Approach","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; American University of Beirut","keywords":"Improvisation; Process (computing); Computer science; Planner; Process management; Management science; Perspective (graphical); Engineering; Artificial intelligence","score_opus":0.13775733000020124,"score_gpt":0.3906547384589313,"score_spread":0.25289740845873004,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4303613618","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30371732,0.00049345597,0.66169417,0.0010290637,0.00008429429,0.00040954212,0.00029742133,0.00043952753,0.03183514],"genre_scores_gemma":[0.92190754,0.00037748055,0.07348394,0.0000589907,0.000017134218,0.0003995218,0.0001379976,0.00002854694,0.0035887435],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995826,0.00025601467,0.000015449614,0.00004626743,0.000058029094,0.000041624626],"domain_scores_gemma":[0.99875736,0.00093968137,0.00009933598,0.00004615232,0.00009061876,0.0000668599],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060459756,0.00061457005,0.0006824463,0.00058150745,0.00069093774,0.0015426655,0.001406836,0.0014216028,0.002522745],"category_scores_gemma":[0.002090568,0.00047005666,0.00071023806,0.0005568306,0.00086931477,0.000981806,0.0010838665,0.0010375922,0.00019162468],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002298266,0.000033016437,0.00043026518,0.000015880607,0.0000149579255,0.000024475368,0.000071949864,0.9938036,0.00019595024,0.0039189565,0.000056921916,0.0014109971],"study_design_scores_gemma":[0.0000089218065,0.000016109749,0.0000619214,0.000004426511,0.000004924402,0.0000032837993,0.000024107883,0.998248,0.00006873077,0.001264277,0.00029095708,0.0000043668665],"about_ca_topic_score_codex":0.020840058,"about_ca_topic_score_gemma":0.016112495,"teacher_disagreement_score":0.020840058,"about_ca_system_score_codex":0.0015971351,"about_ca_system_score_gemma":0.001912278,"threshold_uncertainty_score":0.041437507},"labels":[],"label_agreement":null},{"id":"W4303647010","doi":"10.1108/jfm-03-2022-0029","title":"What (specifically) differentiates the successful and unsuccessful systems delivery projects (SDPs)","year":2022,"lang":"en","type":"article","venue":"Journal of Facilities Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Thompson Rivers University","funders":"","keywords":"Project management; Integrated project delivery; Project planning; Process management; Computer science; Project management triangle; Warranty; Process (computing); Project commissioning; Originality; Project charter; Phase (matter); Operations management; Engineering management; Facility management; Operations research; Business; Systems engineering; Publishing; Engineering; Marketing","score_opus":0.06628591239498523,"score_gpt":0.29848417961631096,"score_spread":0.23219826722132575,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4303647010","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9896331,0.00020639003,0.003274971,0.00045365357,0.000019402283,0.000099388715,0.000094311996,0.000029290395,0.0061894753],"genre_scores_gemma":[0.99740785,0.000080895494,0.0019463915,0.000030444753,0.0000057540815,0.000041537398,0.00004941954,0.000010537371,0.00042719947],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99117976,0.0036685173,0.0012702487,0.0004534375,0.0023775632,0.0010505193],"domain_scores_gemma":[0.9323854,0.031659357,0.02044849,0.0028336442,0.007937414,0.004735693],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008507766,0.00037152178,0.0003200559,0.0022876717,0.0010263846,0.0029755603,0.00065401307,0.0006659209,0.0024203644],"category_scores_gemma":[0.062882796,0.00029571963,0.0004076378,0.0012668769,0.0016438139,0.0017452842,0.0017680993,0.0006985146,0.0006308949],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014893913,0.00023106056,0.8796609,0.00036080362,0.00004666259,0.00033008077,0.008034155,0.00083531067,0.0015606403,0.0021851242,0.000967559,0.10563873],"study_design_scores_gemma":[0.000011781289,0.0003642319,0.9580338,0.00027321134,0.000044593846,0.00096245174,0.027547954,0.0026043335,0.0018359789,0.0033911883,0.0048813093,0.000049141352],"about_ca_topic_score_codex":0.0024728396,"about_ca_topic_score_gemma":0.0033944792,"teacher_disagreement_score":0.008507766,"about_ca_system_score_codex":0.00095667853,"about_ca_system_score_gemma":0.003358289,"threshold_uncertainty_score":0.044993937},"labels":[],"label_agreement":null},{"id":"W4304144351","doi":"10.1108/ijmpb-05-2022-0114","title":"The impact of organizational support for the project management process on project and firm performance","year":2022,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"","keywords":"OPM3; Project management triangle; Project management; Business; Process management; Project stakeholder; Knowledge management; Extreme project management; Project risk management; Computer science; Management; Economics","score_opus":0.06166298052126914,"score_gpt":0.3940246575613599,"score_spread":0.3323616770400908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4304144351","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9957332,0.0000721969,0.0003839656,0.00018897386,0.000004444799,0.000013928099,0.000014129947,0.000007154872,0.003582021],"genre_scores_gemma":[0.99959415,0.000032534426,0.00021420712,0.000011204785,0.000006335638,0.0000071139125,0.000014526892,0.000001666329,0.00011820157],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99265623,0.0037615187,0.0003736406,0.0004166853,0.0019078235,0.0008841589],"domain_scores_gemma":[0.87717354,0.062813446,0.033690333,0.00398699,0.006903274,0.015432364],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0068191895,0.00024300175,0.00019199688,0.0012896133,0.0009412011,0.0027652346,0.00049771636,0.00038958268,0.0025721204],"category_scores_gemma":[0.049023893,0.00012160889,0.00017368022,0.00093159784,0.0010684711,0.0012138359,0.002246233,0.0008922742,0.00027102928],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022072473,0.0013122815,0.8765335,0.00011484646,0.00012269423,0.00036427227,0.003915164,0.0021140657,0.001514051,0.0017233698,0.0005818129,0.11148329],"study_design_scores_gemma":[0.000012180816,0.000556546,0.9893973,0.000058580157,0.000022187834,0.00016085511,0.005772305,0.001896235,0.00038207913,0.00065058714,0.0010731946,0.000017938191],"about_ca_topic_score_codex":0.002261282,"about_ca_topic_score_gemma":0.0031317587,"teacher_disagreement_score":0.0068191895,"about_ca_system_score_codex":0.0012627557,"about_ca_system_score_gemma":0.0028705553,"threshold_uncertainty_score":0.03606373},"labels":[],"label_agreement":null},{"id":"W4306736878","doi":"10.3390/admsci12040141","title":"Do the Project Manager’s Soft Skills Matter? Impacts of the Project Manager’s Emotional Intelligence, Trustworthiness, and Job Satisfaction on Project Success","year":2022,"lang":"en","type":"article","venue":"Administrative Sciences","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Project manager; Functional manager; Project stakeholder; Project management triangle; Project team; Project sponsorship; Project management; Project planning; Emotional intelligence; Project charter; Knowledge management; Project governance; Soft skills; Business; Psychology; Computer science; Engineering; Social psychology","score_opus":0.09946661398226364,"score_gpt":0.40786893894011533,"score_spread":0.3084023249578517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4306736878","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9978994,0.00009824403,0.00012171129,0.00029584632,0.000008032624,0.000007127975,0.000015683048,0.000002336648,0.0015516272],"genre_scores_gemma":[0.99966204,0.000049766364,0.000043836855,0.000037753674,0.0000083689,0.0000045006987,0.000011822825,0.0000016414015,0.00018032515],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99526346,0.002577021,0.0002913848,0.00031219437,0.0009032136,0.0006527398],"domain_scores_gemma":[0.9514093,0.024345426,0.013906673,0.0011015871,0.00188627,0.0073507703],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044772867,0.00023379139,0.0003381733,0.00080472906,0.00055739644,0.001925508,0.0003302138,0.00047714927,0.0034858685],"category_scores_gemma":[0.02638454,0.00023915089,0.0004498936,0.0005409961,0.0010804341,0.0011207814,0.0011220109,0.0009147169,0.00035014172],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014685391,0.00038179653,0.98029035,0.00003479879,0.00013416982,0.000094762676,0.0026581716,0.00013480366,0.00023364711,0.0001688551,0.0002984903,0.015423328],"study_design_scores_gemma":[0.0000048935094,0.0001127414,0.99615955,0.000018992969,0.000024074248,0.000029714238,0.002972195,0.00025416238,0.00007074775,0.00009782473,0.00024936008,0.0000056597905],"about_ca_topic_score_codex":0.0017720896,"about_ca_topic_score_gemma":0.0028262509,"teacher_disagreement_score":0.0044772867,"about_ca_system_score_codex":0.00040542072,"about_ca_system_score_gemma":0.0009451403,"threshold_uncertainty_score":0.023678482},"labels":[],"label_agreement":null},{"id":"W4307866242","doi":"10.5267/j.jpm.2022.8.003","title":"Investigation and ranking the causes of delay in EPC projects of nonindustrial buildings of 9, 10, 19, 20 and 21 phases of South Pars of Iran","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Brainstorming; Economic shortage; Ranking (information retrieval); Descriptive statistics; Delphi; Delphi method; Duration (music); Business; Process (computing); Operations management; Actuarial science; Computer science; Marketing; Economics; Statistics; Mathematics","score_opus":0.1645867307893322,"score_gpt":0.3509329581209643,"score_spread":0.1863462273316321,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307866242","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9976616,0.00015047839,0.000555153,0.00020818804,0.000007815435,0.000047138907,0.000071811926,0.000005726539,0.0012920409],"genre_scores_gemma":[0.9989021,0.00017497466,0.0004503155,0.000009800537,0.0000050430804,0.000015020332,0.000060521495,0.0000021454277,0.00038012568],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99658835,0.00052291283,0.00043311826,0.0002231431,0.0014696192,0.00076289143],"domain_scores_gemma":[0.98321724,0.004463872,0.007460643,0.00031819553,0.0033744047,0.0011655337],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024642574,0.00035312187,0.00021074817,0.0031729455,0.0013116441,0.0011767655,0.000756626,0.0005754903,0.002344768],"category_scores_gemma":[0.012631578,0.0003422949,0.00034704196,0.0027692849,0.00056869024,0.0010921723,0.0011098186,0.0007604542,0.00018659813],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014452593,0.00019894291,0.93469185,0.0002827115,0.00003374412,0.0019645349,0.011911308,0.0014099721,0.0013755453,0.0015147898,0.000984413,0.045487642],"study_design_scores_gemma":[0.000006597327,0.00024080809,0.92611134,0.000108070446,0.00003287828,0.0012135158,0.062444076,0.0025743018,0.0010643353,0.00059981993,0.005563709,0.00004061227],"about_ca_topic_score_codex":0.009578886,"about_ca_topic_score_gemma":0.014677584,"teacher_disagreement_score":0.009578886,"about_ca_system_score_codex":0.0026553303,"about_ca_system_score_gemma":0.0045164316,"threshold_uncertainty_score":0.01926583},"labels":[],"label_agreement":null},{"id":"W4307866551","doi":"10.5267/j.jpm.2022.7.001","title":"Exploring the influence of information and communication technology (ICT) on construction supply chain management: Empirical evidence from a construction project’s perspective","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Information and Communications Technology; Empirical research; Structural equation modeling; Business; Knowledge management; Supply chain management; Supply chain; Empirical evidence; Government (linguistics); Sample (material); Industrial organization; Process management; Computer science; Marketing; Mathematics","score_opus":0.15743625132387865,"score_gpt":0.366883141324253,"score_spread":0.20944689000037434,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307866551","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99133015,0.00068185857,0.0005915244,0.00032185446,0.0000031590835,0.000031419026,0.000018598936,0.0000017858835,0.0070195943],"genre_scores_gemma":[0.99770975,0.0014735274,0.0003987032,0.000026733353,0.0000025449017,0.000014770518,0.000019801588,0.0000011506839,0.0003529858],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9972692,0.0015534242,0.00015601689,0.00013809603,0.00060768944,0.0002755718],"domain_scores_gemma":[0.9612602,0.029494897,0.0051800534,0.0006720158,0.002616428,0.0007763288],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037009001,0.00024002626,0.00017302996,0.0020994642,0.0011314799,0.0024151294,0.00035942436,0.0005789602,0.0023875658],"category_scores_gemma":[0.015781464,0.00030830427,0.00021043737,0.0033429053,0.0016080928,0.0019855052,0.0015602317,0.0006329918,0.0002218898],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023366326,0.00096456765,0.78386396,0.0016797734,0.0001154287,0.0025690473,0.05357098,0.0032152624,0.001785315,0.012454785,0.00065670494,0.13889043],"study_design_scores_gemma":[0.00002611321,0.0009720253,0.70525724,0.0027905633,0.00021888087,0.001073572,0.26402256,0.006099968,0.0022424827,0.0034522915,0.013796227,0.000048140704],"about_ca_topic_score_codex":0.005965467,"about_ca_topic_score_gemma":0.010841144,"teacher_disagreement_score":0.005965467,"about_ca_system_score_codex":0.0014995693,"about_ca_system_score_gemma":0.0039390107,"threshold_uncertainty_score":0.019572437},"labels":[],"label_agreement":null},{"id":"W4307866638","doi":"10.5267/j.jpm.2022.9.001","title":"A risk management model for large projects in the construction phase in Egypt","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Risk analysis (engineering); Risk management; Process (computing); Sustainability; Pre-construction services; Project risk management; Risk assessment; Business; Risk management framework; Engineering; Project management; Process management; Intervention (counseling); Environmental resource management; IT risk management; Project management triangle; Computer science; Systems engineering; Finance; Economics","score_opus":0.10103985600494249,"score_gpt":0.4023554136697534,"score_spread":0.30131555766481094,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307866638","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.471214,0.0014509525,0.43044287,0.0056030927,0.00014439758,0.0006480737,0.0009224394,0.00045262944,0.089121595],"genre_scores_gemma":[0.938845,0.0007993007,0.02897699,0.000106477004,0.000044898854,0.0005674059,0.0002881684,0.0000619434,0.030309929],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988231,0.00049297407,0.00006818139,0.00017340768,0.00014981357,0.00029245653],"domain_scores_gemma":[0.99760157,0.0013014495,0.0003256464,0.000049224927,0.00048788163,0.00023430906],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027133282,0.0011809028,0.00082027086,0.0016572989,0.0017867424,0.004388693,0.0026801967,0.0034481792,0.011539065],"category_scores_gemma":[0.004147799,0.000865887,0.0013647433,0.0010202607,0.0012992003,0.0024152212,0.0022940333,0.0020492822,0.00080811203],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008027389,0.0001207685,0.0021099735,0.00006825457,0.000039402108,0.00050104555,0.0006808466,0.93921065,0.00039684965,0.050943024,0.0008253922,0.0050234236],"study_design_scores_gemma":[0.000027802116,0.000043654396,0.00044658847,0.000024839368,0.000028290639,0.00005572359,0.00038503,0.9870432,0.0000757887,0.0106613,0.0011900613,0.000017680983],"about_ca_topic_score_codex":0.042259187,"about_ca_topic_score_gemma":0.019713985,"teacher_disagreement_score":0.042259187,"about_ca_system_score_codex":0.005231402,"about_ca_system_score_gemma":0.004247123,"threshold_uncertainty_score":0.084026396},"labels":[],"label_agreement":null},{"id":"W4309328395","doi":"10.1080/09537287.2022.2146018","title":"A (meta)governance framework for multi-level governance of inter-organizational project networks","year":2022,"lang":"en","type":"article","venue":"Production Planning & Control","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; Polytechnique Montréal","funders":"","keywords":"Project governance; Corporate governance; Business; Process management; Multi-level governance; Knowledge management; Computer science","score_opus":0.20416675642692314,"score_gpt":0.377311294443568,"score_spread":0.17314453801664484,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4309328395","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035958696,0.00057163875,0.89369184,0.0052014603,0.000052529907,0.0004035965,0.00021172884,0.00016485796,0.063743666],"genre_scores_gemma":[0.7282632,0.0002897083,0.26756114,0.00019986185,0.00003252648,0.00049841177,0.00022819435,0.000033686538,0.0028933364],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99248004,0.0045175795,0.0005827181,0.0009853608,0.0010010191,0.0004333374],"domain_scores_gemma":[0.99107903,0.003656655,0.0016758001,0.0015202747,0.0015105895,0.0005576417],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009817365,0.00045578904,0.0003474826,0.004297996,0.0018408904,0.0068841195,0.0017936478,0.0013159404,0.0039475793],"category_scores_gemma":[0.009358767,0.0004649085,0.0008865914,0.0035233146,0.006355995,0.0076445714,0.0023582398,0.0014702338,0.00039847664],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005341008,0.00002112055,0.0027692895,0.00006288556,0.000019024428,0.00009860133,0.0026299907,0.005344544,0.00021125235,0.97781235,0.0006284016,0.010397124],"study_design_scores_gemma":[0.000023385264,0.000057193647,0.006776419,0.00044709948,0.00004269898,0.00034786452,0.006148688,0.052773364,0.00045894654,0.8960507,0.036841385,0.000032244872],"about_ca_topic_score_codex":0.0044909143,"about_ca_topic_score_gemma":0.0065949773,"teacher_disagreement_score":0.009817365,"about_ca_system_score_codex":0.0057558436,"about_ca_system_score_gemma":0.0047158464,"threshold_uncertainty_score":0.051919818},"labels":[],"label_agreement":null},{"id":"W4309334159","doi":"10.1016/j.plas.2022.100074","title":"Opening the black box of project team members’ competencies improvement in a public sector organization for a successful transition to the project society","year":2022,"lang":"en","type":"article","venue":"Project Leadership and Society","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières; Université du Québec à Chicoutimi","funders":"","keywords":"Project management; Context (archaeology); Knowledge management; Project team; Public sector; Project management triangle; Plan (archaeology); Project charter; Process management; Project plan; Project stakeholder; OPM3; Business; Engineering; Computer science; Political science; Marketing","score_opus":0.14806819784530129,"score_gpt":0.330684726945627,"score_spread":0.18261652910032572,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4309334159","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9701502,0.00009036706,0.007730408,0.0044490257,0.000047765003,0.00019745548,0.000009920919,0.000039587667,0.017285395],"genre_scores_gemma":[0.9943896,0.000046809124,0.0033827543,0.00008890082,0.0000061311034,0.00006240481,0.000008333506,0.0000066326425,0.0020084642],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9905449,0.006487725,0.00018067507,0.00034424727,0.000776603,0.0016658551],"domain_scores_gemma":[0.9912696,0.002816426,0.0008115976,0.00044108107,0.0010038465,0.0036574926],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0112197185,0.00022365252,0.00015796316,0.0005789103,0.0061123464,0.0047794846,0.00086327177,0.0013595575,0.0035716882],"category_scores_gemma":[0.013702721,0.00024993738,0.00021509292,0.00040636212,0.0029977774,0.0024621894,0.005743032,0.0019100233,0.00047211375],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005206626,0.0040192557,0.07319909,0.0005367053,0.000038836075,0.0054416168,0.39628676,0.0044691735,0.009778904,0.056952313,0.014803438,0.43395326],"study_design_scores_gemma":[0.00006065641,0.0018476697,0.06860757,0.0005379426,0.000028559438,0.0015634068,0.8138514,0.0064227195,0.006035457,0.016589357,0.08435548,0.00009974918],"about_ca_topic_score_codex":0.0018497321,"about_ca_topic_score_gemma":0.004027584,"teacher_disagreement_score":0.0112197185,"about_ca_system_score_codex":0.002257957,"about_ca_system_score_gemma":0.014653949,"threshold_uncertainty_score":0.059336305},"labels":[],"label_agreement":null},{"id":"W4309927946","doi":"10.1177/87569728221131254","title":"A Multilevel Governance Model for Interorganizational Project Networks","year":2022,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kamloops Art Gallery","funders":"","keywords":"Corporate governance; Project governance; Multi-level governance; Network governance; Business; Multilevel model; Information governance; Knowledge management; Process management; Political science; Computer science","score_opus":0.12252738012753336,"score_gpt":0.3765800070787754,"score_spread":0.2540526269512421,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4309927946","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16934499,0.00031726362,0.757297,0.0038082527,0.000051596584,0.0007520889,0.0007183333,0.0003027443,0.06740772],"genre_scores_gemma":[0.91798514,0.00025701048,0.07508215,0.00012841244,0.000027266819,0.0006951213,0.0003616891,0.000030286079,0.005432865],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9959692,0.0018978325,0.00018654359,0.0006689834,0.0008699643,0.0004075944],"domain_scores_gemma":[0.9927435,0.0027400684,0.0019182843,0.000902441,0.0011750271,0.00052071613],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041247304,0.00029570327,0.00037432395,0.0019180469,0.00097397796,0.0026075433,0.0012600241,0.0006912822,0.005338063],"category_scores_gemma":[0.011949382,0.00030998568,0.0009672947,0.0016940032,0.0017873523,0.004371957,0.001794417,0.0010529873,0.0007049177],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002757522,0.000085301,0.021647727,0.00008652275,0.00007105306,0.0001387644,0.0019288713,0.055450607,0.0007663879,0.8936112,0.0020266369,0.024159228],"study_design_scores_gemma":[0.00008933547,0.00022267642,0.026569393,0.0002015194,0.00009378059,0.00025390158,0.0018664047,0.35307723,0.00032601604,0.59646404,0.020779075,0.000056544548],"about_ca_topic_score_codex":0.007810444,"about_ca_topic_score_gemma":0.010126745,"teacher_disagreement_score":0.007810444,"about_ca_system_score_codex":0.004282611,"about_ca_system_score_gemma":0.002677813,"threshold_uncertainty_score":0.031072617},"labels":[],"label_agreement":null},{"id":"W4310163555","doi":"10.33423/jabe.v24i5.5624","title":"Evaluating Financial Feasibility Studies Based on Real Estate Developers’ Requirements","year":2022,"lang":"en","type":"article","venue":"Journal of Applied Business and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Real estate; Business; Finance; Real estate development; Estate; Marketing; Computer science; Accounting","score_opus":0.3333708682990116,"score_gpt":0.42831809458140696,"score_spread":0.09494722628239538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310163555","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94841594,0.00032917617,0.020408124,0.0008639934,0.000049006383,0.0032414093,0.00029530682,0.00009392625,0.026303172],"genre_scores_gemma":[0.9509857,0.00028560287,0.043685842,0.00011030994,0.000022739787,0.0028462508,0.00041762058,0.000033168148,0.0016126302],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9147598,0.056034703,0.007078571,0.0013744399,0.018238693,0.0025137162],"domain_scores_gemma":[0.47619867,0.41932362,0.025572503,0.007456654,0.06725362,0.0041949865],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.112969644,0.0009178953,0.00075550895,0.008575649,0.0013428337,0.0049517155,0.001419858,0.0013987435,0.005833713],"category_scores_gemma":[0.25652367,0.0005443858,0.0009747048,0.003400495,0.0013455842,0.0051076775,0.0036068847,0.0011354126,0.0008114599],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0034975098,0.006006117,0.19016363,0.0071761166,0.0003447495,0.0049595805,0.1079147,0.025472086,0.025302198,0.028133633,0.013536542,0.5874931],"study_design_scores_gemma":[0.00153595,0.017630152,0.39591885,0.008421481,0.0007587401,0.0042990227,0.2869967,0.08085248,0.05847086,0.02838634,0.11563046,0.0010989404],"about_ca_topic_score_codex":0.0009885558,"about_ca_topic_score_gemma":0.0017811796,"teacher_disagreement_score":0.112969644,"about_ca_system_score_codex":0.0047182348,"about_ca_system_score_gemma":0.00546629,"threshold_uncertainty_score":0.59744775},"labels":[],"label_agreement":null},{"id":"W4311038674","doi":"10.14738/assrj.912.13550","title":"Assessing Performance Dimensions in Architecture, Engineer-ing and Construction Organizations","year":2022,"lang":"en","type":"article","venue":"Advances in Social Sciences Research Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Architecture; Compatibility (geochemistry); Process management; Field (mathematics); Computer science; Knowledge management; Exploratory research; Set (abstract data type); Engineering management; Business; Engineering; Sociology","score_opus":0.13368883569211126,"score_gpt":0.48562329305653507,"score_spread":0.3519344573644238,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4311038674","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9936581,0.000046063044,0.00063656725,0.00013483019,0.000004346092,0.000029699666,0.00005327653,0.000004856,0.0054321806],"genre_scores_gemma":[0.99931026,0.000023804812,0.00035675257,0.000009810069,0.0000030174792,0.00003549651,0.00007151773,0.0000015405208,0.000187817],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9890456,0.005214755,0.00094904774,0.00049237494,0.0029603487,0.0013379175],"domain_scores_gemma":[0.958296,0.021356585,0.0103122005,0.0014425656,0.005078392,0.0035141017],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011449254,0.00034123796,0.0003574031,0.0053983266,0.0020472344,0.0038998837,0.00048735304,0.0008061266,0.0018951044],"category_scores_gemma":[0.030335443,0.00017445433,0.00036446445,0.005713506,0.003908358,0.0038511464,0.0054205107,0.0009859909,0.00029516302],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031283763,0.0005873341,0.91660637,0.00011342715,0.00010443362,0.0001438077,0.02809784,0.0021847368,0.000805268,0.009852706,0.00070996577,0.040481362],"study_design_scores_gemma":[0.000013391633,0.00054499484,0.91604984,0.00006986986,0.000019701609,0.000096753756,0.07082468,0.0045878687,0.0006352535,0.0042284653,0.0028841158,0.000045062654],"about_ca_topic_score_codex":0.0028956407,"about_ca_topic_score_gemma":0.0030459447,"teacher_disagreement_score":0.011449254,"about_ca_system_score_codex":0.0033950242,"about_ca_system_score_gemma":0.0019377789,"threshold_uncertainty_score":0.060550153},"labels":[],"label_agreement":null},{"id":"W4311884401","doi":"10.3390/buildings12122242","title":"Towards a Data-Rich Era: A Bibliometric Analysis of Construction Management from 2000 to 2020","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"National Social Science Fund of China; National Office for Philosophy and Social Sciences; National Natural Science Foundation of China","keywords":"Data management; Data science; Big data; Field (mathematics); Computer science; Domain (mathematical analysis); Technology management; Knowledge management; Emerging technologies; Engineering management; Management science; Engineering; Data mining","score_opus":0.0820736274263793,"score_gpt":0.3692760089674105,"score_spread":0.28720238154103117,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4311884401","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5940981,0.2681094,0.0052475184,0.011398791,0.0007434115,0.00038261266,0.04848028,0.00031979647,0.07122012],"genre_scores_gemma":[0.83120185,0.13222082,0.0073486576,0.00060467434,0.00048292082,0.0003275118,0.02403276,0.000070011156,0.0037107335],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9918326,0.0013726889,0.0015878946,0.00058634777,0.004248857,0.00037156916],"domain_scores_gemma":[0.9702631,0.01459847,0.005391224,0.0008144341,0.008336786,0.000595955],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.006495026,0.00043257562,0.00081909617,0.10571885,0.0011581988,0.0059427847,0.0005030687,0.00069594145,0.0020166864],"category_scores_gemma":[0.02937378,0.0002071275,0.00077181525,0.1772389,0.0008802032,0.0057636066,0.0019007464,0.00059822045,0.00057749584],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035382548,0.00013547351,0.24257137,0.028933587,0.00089990906,0.0016130432,0.017583286,0.0016668461,0.003221564,0.024430497,0.0387083,0.63988227],"study_design_scores_gemma":[0.000016092295,0.0001421272,0.64109313,0.012554447,0.0008340718,0.0016677356,0.028820354,0.0023856915,0.0022757743,0.0057104127,0.30436647,0.00013376072],"about_ca_topic_score_codex":0.007877657,"about_ca_topic_score_gemma":0.012575815,"teacher_disagreement_score":0.89428115,"about_ca_system_score_codex":0.0036102985,"about_ca_system_score_gemma":0.0048278086,"threshold_uncertainty_score":0.034349382},"labels":[{"model":"gemma","categories":["bibliometrics"],"domain":null,"study_design":"observational","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":["bibliometrics"],"domain":null,"study_design":"design_other","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"high"}],"label_agreement":"split"},{"id":"W4313493995","doi":"10.1080/15623599.2022.2159632","title":"An empirical evaluation of the causes leading to binding dispute resolution mechanisms in the Quebec construction industry","year":2023,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Dispute resolution; Coding (social sciences); Empirical research; Computer science; Operations research; Political science; Business; Engineering; Law; Sociology; Epistemology; Social science","score_opus":0.1584646146791643,"score_gpt":0.4569797147606516,"score_spread":0.2985151000814873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313493995","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9875683,0.00039729485,0.000777794,0.00083245966,0.00000974505,0.00033140124,0.00013757918,0.000007320176,0.009938029],"genre_scores_gemma":[0.99694616,0.00031903636,0.00066668843,0.00010726886,0.0000030943097,0.00009217561,0.000075383294,0.0000025903064,0.0017876447],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9867937,0.005845028,0.00062365783,0.0006612,0.0036874379,0.0023890266],"domain_scores_gemma":[0.91978467,0.04549572,0.0092098005,0.0012813518,0.021590123,0.0026383274],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014471739,0.0003464836,0.0003136574,0.004561532,0.011607248,0.0046351883,0.0023056967,0.0012279868,0.004496546],"category_scores_gemma":[0.046867125,0.0005151137,0.00027900547,0.005279338,0.00397742,0.0016490043,0.0022650363,0.0015240461,0.00017813724],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040641602,0.0007747725,0.6618546,0.0008195576,0.00011023551,0.0033305695,0.23005852,0.0027011363,0.0015878571,0.014293373,0.004446461,0.07961657],"study_design_scores_gemma":[0.000048369388,0.00020836167,0.5657901,0.0005954404,0.000056476463,0.00029398396,0.41248947,0.005608019,0.0006441034,0.00061819603,0.013577801,0.00006972636],"about_ca_topic_score_codex":0.94995767,"about_ca_topic_score_gemma":0.9765896,"teacher_disagreement_score":0.06841382,"about_ca_system_score_codex":0.06841382,"about_ca_system_score_gemma":0.07004095,"threshold_uncertainty_score":0.49637932},"labels":[],"label_agreement":null},{"id":"W4313500455","doi":"10.1007/978-3-030-46054-9_26-4","title":"Creating Effective Efforts: Managing Stakeholder Value","year":2023,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal; Université du Québec à Montréal","funders":"","keywords":"Stakeholder; Project stakeholder; Value (mathematics); Project management; Stakeholder analysis; Knowledge management; Business; Project charter; Process management; Context (archaeology); Extreme project management; Project management triangle; Stakeholder management; Corporate governance; Project governance; OPM3; Engineering; Computer science; Public relations; Political science; Systems engineering","score_opus":0.13392702589632685,"score_gpt":0.3439541212709998,"score_spread":0.21002709537467293,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313500455","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004640553,0.004498801,0.07684455,0.010552426,0.00031784436,0.00010331795,0.000028748917,0.00015168243,0.9028621],"genre_scores_gemma":[0.3121409,0.012374161,0.11263497,0.00368973,0.00043686692,0.00070011994,0.00015265527,0.0006348244,0.5572358],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.997029,0.0014062815,0.00005371954,0.000143964,0.0011313154,0.00023576578],"domain_scores_gemma":[0.99815804,0.001176095,0.00010045236,0.00014657159,0.0002513047,0.00016758456],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002965488,0.00075680664,0.0003467392,0.0011508875,0.0017881391,0.011018257,0.0012263276,0.0023316692,0.010075951],"category_scores_gemma":[0.0043248027,0.00041256228,0.0002164227,0.0017412747,0.006664896,0.008160964,0.0036222036,0.0023352082,0.0029781442],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000039937804,0.000030964595,0.00013561214,0.00011254817,0.000004861146,0.00006409102,0.003427058,0.0007007332,0.0005592657,0.85820234,0.030635152,0.10612339],"study_design_scores_gemma":[0.000004433032,0.000022478122,0.00033293254,0.0004731226,0.000006949546,0.00011103834,0.0047765602,0.0020895198,0.0012135999,0.5877871,0.40316802,0.000014262614],"about_ca_topic_score_codex":0.0016994664,"about_ca_topic_score_gemma":0.0046748994,"teacher_disagreement_score":0.011018257,"about_ca_system_score_codex":0.0033636892,"about_ca_system_score_gemma":0.005251132,"threshold_uncertainty_score":0.03370744},"labels":[],"label_agreement":null},{"id":"W4316096515","doi":"10.1108/bij-07-2022-0444","title":"Team leader survival syndrome, tenure and management styles towards professional subordinates on construction megaprojects; sustainability and corporate governance","year":2023,"lang":"en","type":"article","venue":"Benchmarking An International Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Multinational corporation; Corporate governance; Adversarial system; Public relations; Grounded theory; Leadership style; Qualitative research; Competitive advantage; Face (sociological concept); Management styles; Business; Sociology; Marketing; Political science; Finance; Social science","score_opus":0.07825609887560118,"score_gpt":0.3755667973114899,"score_spread":0.2973106984358887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4316096515","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99861443,0.0000724507,0.00019234425,0.00010471138,0.0000074560403,0.0000065940035,0.000004868201,0.0000023363898,0.0009947803],"genre_scores_gemma":[0.9994899,0.000050349416,0.00012459519,0.000017367533,0.000004104384,0.000008221182,0.0000070739816,8.243914e-7,0.00029765524],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.998176,0.0008487343,0.000091416674,0.00014035916,0.0005392929,0.00020427398],"domain_scores_gemma":[0.9948585,0.0011470056,0.002256121,0.0001734602,0.0005733554,0.0009914225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016568422,0.00017810073,0.00020508863,0.00073942635,0.0015826058,0.0012058079,0.00031961896,0.00029270846,0.001196379],"category_scores_gemma":[0.0049556503,0.00011381505,0.00016042034,0.00038115928,0.0015452044,0.0005009883,0.0013191283,0.00057652546,0.00013497873],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011353256,0.00031976655,0.7129149,0.00016023291,0.000031457297,0.0029088168,0.22973526,0.00018924447,0.0038722134,0.001481874,0.0011721498,0.047100607],"study_design_scores_gemma":[0.0000085444935,0.00044576844,0.717642,0.00009487501,0.000015018365,0.0026595686,0.27417794,0.00039529672,0.00074366166,0.00084106246,0.0029533233,0.000022947668],"about_ca_topic_score_codex":0.0016785428,"about_ca_topic_score_gemma":0.0036311997,"teacher_disagreement_score":0.0016785428,"about_ca_system_score_codex":0.00078707736,"about_ca_system_score_gemma":0.0010342327,"threshold_uncertainty_score":0.00876236},"labels":[],"label_agreement":null},{"id":"W4316673098","doi":"10.1108/ci-11-2021-0211","title":"Estimating labor resource requirements in construction projects using machine learning","year":2023,"lang":"en","type":"article","venue":"Construction Innovation","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Machine learning; Computer science; Artificial intelligence; Resource (disambiguation); Artificial neural network; Prioritization; Work (physics); Originality; Resource allocation; Operations research; Engineering; Management science","score_opus":0.17638230093639642,"score_gpt":0.39901868142130614,"score_spread":0.22263638048490972,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4316673098","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8008948,0.00028546582,0.19490829,0.00013718526,0.000013984731,0.00014092782,0.0007114971,0.00022550118,0.0026823939],"genre_scores_gemma":[0.96906024,0.00012278675,0.029762909,0.000007963463,0.0000062917043,0.000071148694,0.00049850286,0.000012333758,0.00045794304],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998963,0.00032561008,0.00009577877,0.00019983096,0.00033743284,0.00007829875],"domain_scores_gemma":[0.99712604,0.0014422848,0.00074235944,0.00021233081,0.00041318918,0.0000638868],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012866558,0.0006188337,0.00046913722,0.0018104522,0.00023363206,0.0006872742,0.0005434093,0.0003868789,0.0007305322],"category_scores_gemma":[0.005501189,0.0002892306,0.0004748276,0.0016598753,0.0001998015,0.0009683098,0.0004137675,0.00039679342,0.00023548851],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010038899,0.00016208537,0.13534965,0.00016333075,0.00007934594,0.00012257503,0.00017813942,0.730402,0.0031457287,0.0010457811,0.0006241875,0.12862676],"study_design_scores_gemma":[0.0000026780956,0.00007599033,0.03257834,0.00002692081,0.000010210428,0.0000256115,0.0001269677,0.96445405,0.0014083245,0.0009069599,0.00036857338,0.000015412037],"about_ca_topic_score_codex":0.0118339015,"about_ca_topic_score_gemma":0.010830349,"teacher_disagreement_score":0.0118339015,"about_ca_system_score_codex":0.0009806934,"about_ca_system_score_gemma":0.0011359098,"threshold_uncertainty_score":0.023530066},"labels":[],"label_agreement":null},{"id":"W4317793543","doi":"10.1109/wsc57314.2022.10015329","title":"System Dynamics Modeling of the Construction Supply Chain in Industrial Modularized Construction Projects","year":2022,"lang":"en","type":"article","venue":"2022 Winter Simulation Conference (WSC)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Duration (music); Supply chain; Rework; Scope (computer science); System dynamics; Systems engineering; Computer science; Causal loop diagram; Stakeholder; Variable (mathematics); Industrial engineering; Operations research; Process management; Engineering; Business","score_opus":0.11474720081063897,"score_gpt":0.3173898613455801,"score_spread":0.20264266053494115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317793543","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50283056,0.00038130672,0.47455198,0.0004345437,0.00003941112,0.00020653525,0.00070163346,0.00030399932,0.020549985],"genre_scores_gemma":[0.9812924,0.00028830976,0.014576062,0.0000208316,0.0000073036294,0.0001997787,0.00018835609,0.000019464835,0.00340746],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968016,0.00012773866,0.000016207961,0.00006788044,0.000052927135,0.000055088603],"domain_scores_gemma":[0.9994886,0.00028938454,0.00008737502,0.000018150899,0.00008750828,0.000029048848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059130584,0.00056788966,0.00044233294,0.0006639928,0.00054007076,0.0010969009,0.00077044516,0.0009931296,0.0027032038],"category_scores_gemma":[0.001231726,0.0003445072,0.00065247004,0.00076910056,0.0004902201,0.0009809509,0.00080611854,0.0006617845,0.00020793702],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010738717,0.000012757248,0.0009650616,0.000012824437,0.0000077921795,0.000045256293,0.000056019006,0.99453545,0.00038171836,0.0027450193,0.000050627783,0.0011766328],"study_design_scores_gemma":[0.000004010057,0.000012126243,0.00028723877,0.0000036615618,0.0000034407951,0.0000057839843,0.000031091444,0.9983662,0.00008296929,0.00097585155,0.00022436879,0.0000032425041],"about_ca_topic_score_codex":0.026777199,"about_ca_topic_score_gemma":0.0123696495,"teacher_disagreement_score":0.026777199,"about_ca_system_score_codex":0.0012749953,"about_ca_system_score_gemma":0.001666327,"threshold_uncertainty_score":0.053242683},"labels":[],"label_agreement":null},{"id":"W4317815230","doi":"10.1109/wsc57314.2022.10015519","title":"Agent-Based Modeling and Simulation of Multidimensional Impacts of Construction Labor Productivity Factors","year":2022,"lang":"en","type":"article","venue":"2022 Winter Simulation Conference (WSC)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Productivity; Interdependence; Computer science; Set (abstract data type); Risk analysis (engineering); Business; Economics","score_opus":0.10824381807834135,"score_gpt":0.3609182820732683,"score_spread":0.252674463994927,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317815230","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63641065,0.00032294233,0.33552667,0.0005855725,0.00008394517,0.00021263349,0.00075837737,0.00036605855,0.025733147],"genre_scores_gemma":[0.97927845,0.00019550174,0.016543629,0.000022020096,0.000006720337,0.00018115285,0.00014961431,0.000014762023,0.0036080698],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996916,0.00015045793,0.000015202192,0.000036837388,0.000047223293,0.000058694666],"domain_scores_gemma":[0.9991628,0.0005296037,0.00010052576,0.000046055175,0.00009390579,0.00006716266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006368801,0.000523961,0.00057962775,0.00050597306,0.00040231433,0.0012637627,0.00093920267,0.0010513053,0.0026040173],"category_scores_gemma":[0.0016269077,0.00034884512,0.00058276416,0.00065140944,0.000583326,0.00064404827,0.0008528181,0.00072050834,0.00017963705],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001317297,0.000012033952,0.0004617628,0.000006723258,0.0000063670195,0.000015517287,0.000020999016,0.99693704,0.00009202027,0.001793129,0.000038915558,0.00060237944],"study_design_scores_gemma":[0.0000067683145,0.000011418487,0.00013846954,0.0000026629375,0.000004250297,0.000003112387,0.000019411224,0.9988638,0.000059280013,0.0006835629,0.00020448474,0.0000027407455],"about_ca_topic_score_codex":0.02191377,"about_ca_topic_score_gemma":0.012371467,"teacher_disagreement_score":0.02191377,"about_ca_system_score_codex":0.0011021937,"about_ca_system_score_gemma":0.0014509652,"threshold_uncertainty_score":0.043572426},"labels":[],"label_agreement":null},{"id":"W4319233415","doi":"10.5430/ijba.v14n1p1","title":"A Philosophical Perspective of Project Management’s Human Dimension","year":2023,"lang":"en","type":"article","venue":"International Journal of Business Administration","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Perspective (graphical); Dimension (graph theory); Project manager; Project management triangle; Knowledge management; Project management; Project charter; Relation (database); Project stakeholder; Engineering ethics; Element (criminal law); OPM3; Project team; Sociology; Business; Management; Process management; Computer science; Political science; Engineering","score_opus":0.1365504308498387,"score_gpt":0.44123751310685067,"score_spread":0.30468708225701197,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4319233415","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018406458,0.015733575,0.30805758,0.15894482,0.001956822,0.00022799242,0.00008005489,0.000083829866,0.4965089],"genre_scores_gemma":[0.88144684,0.008276193,0.077028,0.010500432,0.002265966,0.0006787604,0.000037548863,0.000070162954,0.019696116],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9842202,0.012012224,0.00049137237,0.0007932598,0.0019012806,0.00058168947],"domain_scores_gemma":[0.9870356,0.008950208,0.0010959735,0.0008862025,0.001238263,0.0007937507],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015367426,0.0008176215,0.00041341092,0.003234805,0.005375056,0.009493184,0.001939041,0.004414818,0.0034952527],"category_scores_gemma":[0.009240391,0.00038979534,0.00059455953,0.0016951397,0.067793906,0.008951866,0.0046437453,0.006241555,0.0006671555],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002633041,0.000010005326,0.0000643662,0.000042130505,0.0000023459434,0.000025842677,0.0027389887,0.00023138543,0.000035449135,0.9942327,0.0006046409,0.002009542],"study_design_scores_gemma":[0.000012295384,0.000041641026,0.00020139945,0.00027636334,0.000004443497,0.000104820094,0.0040151086,0.0011850152,0.00014450737,0.90050465,0.09349513,0.000014678323],"about_ca_topic_score_codex":0.0030892338,"about_ca_topic_score_gemma":0.002027366,"teacher_disagreement_score":0.015367426,"about_ca_system_score_codex":0.006919856,"about_ca_system_score_gemma":0.0062567308,"threshold_uncertainty_score":0.08127171},"labels":[],"label_agreement":null},{"id":"W4319716196","doi":"10.58840/ots.v1i1.3","title":"Canadian Production Improvement: A Project Management Improvement Program with Implementing the Knowledge Management Principles","year":2022,"lang":"en","type":"article","venue":"OTS Canadian Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Knowledge management; Business; Knowledge sharing; Production (economics); Project management; Human resource management; Program management; Engineering; Computer science; Systems engineering","score_opus":0.05531496413584455,"score_gpt":0.32293072159852904,"score_spread":0.2676157574626845,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4319716196","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.844698,0.0014757377,0.025082415,0.008159294,0.00016414859,0.006369547,0.0011969543,0.0012456485,0.1116083],"genre_scores_gemma":[0.8967138,0.0010971379,0.07064889,0.0006479414,0.000025635376,0.0010281985,0.0006465679,0.00004105971,0.02915073],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99756396,0.00045971284,0.00006943255,0.00025229278,0.0012183312,0.00043623435],"domain_scores_gemma":[0.9962262,0.00027074548,0.0004411976,0.00027120134,0.0017809351,0.0010097285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002473001,0.00039746767,0.00018548343,0.0011285396,0.0034632555,0.001197092,0.0012631706,0.0003155064,0.002597978],"category_scores_gemma":[0.0049341656,0.00024534538,0.0002939695,0.0020446912,0.00080392463,0.0005197847,0.0020573325,0.00075626525,0.00023419298],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004624601,0.0034138116,0.04883772,0.000988245,0.00010216529,0.00045972233,0.00816671,0.0050575878,0.011421551,0.0072933375,0.029705565,0.8840912],"study_design_scores_gemma":[0.00047925895,0.0024648972,0.7489994,0.00034526887,0.00024141105,0.00028144306,0.008957063,0.005512482,0.012963498,0.0013106135,0.218304,0.0001406349],"about_ca_topic_score_codex":0.82429236,"about_ca_topic_score_gemma":0.9328639,"teacher_disagreement_score":0.97837263,"about_ca_system_score_codex":0.021627378,"about_ca_system_score_gemma":0.11699137,"threshold_uncertainty_score":0.3534848},"labels":[],"label_agreement":null},{"id":"W4320153321","doi":"10.31355/87","title":"The PMO as Performance Driver for Non-Profit Organizations – From Operational Data to Strategic Goals","year":2022,"lang":"en","type":"article","venue":"Journal of Digital Innovation for Humanity","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"OPM3; Process management; Business; Project management; Organizational performance; Project stakeholder; Knowledge management; Project management triangle; Project portfolio management; Project charter; Computer science; Engineering; Systems engineering","score_opus":0.2576271258183703,"score_gpt":0.40420853562486625,"score_spread":0.14658140980649598,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320153321","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2849062,0.011367552,0.11264539,0.27469143,0.0033659718,0.0007200077,0.0026021108,0.0021033983,0.3075979],"genre_scores_gemma":[0.9442067,0.0032924805,0.03649648,0.0050857174,0.0009426991,0.0003437367,0.0013319352,0.00046163652,0.007838504],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.95947945,0.016046617,0.0022144127,0.0024682602,0.01681595,0.0029753146],"domain_scores_gemma":[0.92110115,0.028408263,0.012929861,0.005673272,0.021671953,0.010215563],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.034965742,0.0010268164,0.00071414845,0.0055123316,0.0026388178,0.027137943,0.0018764506,0.002195533,0.0030206293],"category_scores_gemma":[0.051978324,0.00045378957,0.00045572882,0.0073043783,0.0071163727,0.019939357,0.012059436,0.0047229845,0.0016651558],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000268252,0.00030977634,0.09715831,0.0015990174,0.000087104825,0.00037518813,0.016462533,0.0021442475,0.002535444,0.4461878,0.058205906,0.37466642],"study_design_scores_gemma":[0.00004778731,0.0011652877,0.12613082,0.0042078835,0.00009093025,0.0010211444,0.07599147,0.012841483,0.00629231,0.2894856,0.48229,0.0004352253],"about_ca_topic_score_codex":0.003176872,"about_ca_topic_score_gemma":0.0017708433,"teacher_disagreement_score":0.034965742,"about_ca_system_score_codex":0.007286442,"about_ca_system_score_gemma":0.0127159115,"threshold_uncertainty_score":0.1849187},"labels":[],"label_agreement":null},{"id":"W4320186808","doi":"10.1108/ecam-10-2022-0941","title":"A supply chain perspective of prefabricated housebuilding diffusion in New Zealand","year":2023,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Supply chain; Context (archaeology); Originality; Business; Marketing; Perspective (graphical); Stakeholder; Industrial organization; Sustainability; Perception; Exploratory research; Qualitative research; Economics; Management; Psychology; Sociology; Computer science","score_opus":0.02427958436359527,"score_gpt":0.2879980251642769,"score_spread":0.26371844080068163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320186808","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7460587,0.0026001625,0.024532465,0.00931257,0.00007006693,0.0003744743,0.00023051578,0.000032165368,0.21678886],"genre_scores_gemma":[0.99026394,0.0012104389,0.0024002811,0.00009616197,0.000007348744,0.000041801402,0.000035924062,0.0000063440402,0.005937887],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9986835,0.00048381425,0.00008622253,0.0001700818,0.00033863407,0.00023781366],"domain_scores_gemma":[0.99751425,0.0010297662,0.00053343177,0.000092596434,0.0006094614,0.00022051726],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001969819,0.00029699897,0.00021762948,0.0014781092,0.003019449,0.0056523806,0.0006531859,0.0009781334,0.010209387],"category_scores_gemma":[0.0038154437,0.00030801282,0.0002851303,0.0027170624,0.004176326,0.005662254,0.0026618734,0.001133845,0.00028080094],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019098073,0.00020711418,0.0813876,0.0016452959,0.000057266254,0.01602962,0.37625238,0.007772224,0.011485039,0.41443902,0.0028249926,0.08770845],"study_design_scores_gemma":[0.000042692533,0.00028602924,0.087859035,0.0016830427,0.000085944805,0.0024296376,0.61644226,0.015241573,0.0027003584,0.0737822,0.19933291,0.00011432123],"about_ca_topic_score_codex":0.24412131,"about_ca_topic_score_gemma":0.1683906,"teacher_disagreement_score":0.24412131,"about_ca_system_score_codex":0.012779157,"about_ca_system_score_gemma":0.008404282,"threshold_uncertainty_score":0.48540074},"labels":[],"label_agreement":null},{"id":"W4320492476","doi":"10.1002/csan.20962","title":"Taking the Guesswork Out of Lodging Ratings","year":2023,"lang":"en","type":"article","venue":"CSA News","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Mathematics","score_opus":0.22676949216429873,"score_gpt":0.4213453168485782,"score_spread":0.19457582468427945,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320492476","genre_codex":"empirical","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5956247,0.0023622867,0.24308965,0.015184262,0.005580816,0.005400144,0.0055229194,0.004088783,0.12314653],"genre_scores_gemma":[0.6072101,0.0020869789,0.3283158,0.004924073,0.00062612863,0.002840318,0.0036097576,0.0007628925,0.04962394],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9847734,0.0067073773,0.0020300588,0.0015319912,0.004482109,0.0004750388],"domain_scores_gemma":[0.9209026,0.031017117,0.007978358,0.01265484,0.025457092,0.0019899406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022929383,0.001477108,0.0012401349,0.0019153868,0.0012143649,0.0023167315,0.0014763338,0.0015057098,0.015794927],"category_scores_gemma":[0.08853886,0.00064957683,0.000834374,0.0008020255,0.0011869401,0.0021780718,0.0015098461,0.0021534807,0.013956059],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0030446157,0.0013030901,0.14439945,0.0010291314,0.00027147893,0.0005709101,0.0070480546,0.0012419893,0.03501162,0.004083811,0.09538807,0.7066079],"study_design_scores_gemma":[0.00063344976,0.008533316,0.41248095,0.0024015186,0.00060478883,0.0034197676,0.035575435,0.025662107,0.09646556,0.03347896,0.37946016,0.0012839757],"about_ca_topic_score_codex":0.0019036472,"about_ca_topic_score_gemma":0.0046605994,"teacher_disagreement_score":0.022929383,"about_ca_system_score_codex":0.0010569678,"about_ca_system_score_gemma":0.0009630063,"threshold_uncertainty_score":0.12126362},"labels":[],"label_agreement":null},{"id":"W4320503226","doi":"10.55603/jes.v1i2.a1","title":"Identifying Managerial Awareness Level on Negotiation and Conflict Resolution in Nepalese Banking Sectors: Descriptive Cross-sectional Analysis","year":2022,"lang":"en","type":"article","venue":"Journal of Economic Sciences","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Quest University Canada","funders":"","keywords":"Negotiation; Business; Conflict resolution; Process (computing); Sample (material); Descriptive statistics; Banking industry; Descriptive research; Public relations; Marketing; Accounting; Political science; Sociology; Computer science","score_opus":0.3399802828867594,"score_gpt":0.4347616991278024,"score_spread":0.09478141624104297,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320503226","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99928147,0.000041390133,0.00004897802,0.000023150436,0.0000010205082,0.0000233266,0.000077512195,5.7430043e-7,0.0005026046],"genre_scores_gemma":[0.9993437,0.000072467665,0.00010357256,0.000025555819,0.0000024384544,0.000061739745,0.0001157298,6.653781e-7,0.00027414243],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999342,0.00021495497,0.000101764286,0.000071711576,0.00013666952,0.00013285622],"domain_scores_gemma":[0.9954678,0.002065309,0.0014355918,0.00016315635,0.00051222445,0.00035597818],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015160757,0.00012553103,0.00019391117,0.0012067587,0.0006670722,0.0009960785,0.00030096766,0.00041093768,0.002274113],"category_scores_gemma":[0.0043658605,0.0003415849,0.00028096803,0.0009543879,0.00048725598,0.0007976104,0.00071621494,0.0007539442,0.00033190296],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029626326,0.00019991583,0.991384,0.000030079731,0.000015556123,0.00010768525,0.0055507007,0.000023673705,0.00018307923,0.00007766218,0.00008716635,0.0023108965],"study_design_scores_gemma":[0.0000015016117,0.00016602347,0.9831147,0.00003118775,0.000010686287,0.00020934959,0.01580082,0.000118338714,0.00011069573,0.000040561983,0.0003907184,0.0000053859517],"about_ca_topic_score_codex":0.0025367734,"about_ca_topic_score_gemma":0.00392727,"teacher_disagreement_score":0.0025367734,"about_ca_system_score_codex":0.000449245,"about_ca_system_score_gemma":0.0005942262,"threshold_uncertainty_score":0.008017838},"labels":[],"label_agreement":null},{"id":"W4320916967","doi":"10.18280/ijsdp.180120","title":"Evaluating the Interrelationships Among Key Stakeholders’ Performance in Achieving Project Success","year":2023,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Key (lock); Process management; Business; Environmental resource management; Computer science; Environmental science; Computer security","score_opus":0.29437929321384354,"score_gpt":0.4285605696090697,"score_spread":0.13418127639522615,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320916967","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98975873,0.00012396595,0.00430288,0.00023496644,0.000005797898,0.00006086593,0.00003807905,0.000010319865,0.005464475],"genre_scores_gemma":[0.9990478,0.00004868853,0.0007696019,0.0000054992015,0.0000015332372,0.000015779757,0.000014146339,0.0000017927138,0.00009504438],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9834019,0.010118996,0.0011435385,0.0006806795,0.0035886383,0.0010661585],"domain_scores_gemma":[0.9449343,0.03565364,0.009129259,0.0011500822,0.0068906895,0.002241953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015552748,0.00052432064,0.00034166293,0.0022503177,0.0009557479,0.0021874604,0.00036778513,0.000602655,0.0018202143],"category_scores_gemma":[0.043937743,0.00026460012,0.00043382065,0.0013688672,0.0009932162,0.0021249673,0.0022733104,0.0006865198,0.00026224382],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018985015,0.0002771169,0.9100463,0.00023917896,0.00023524975,0.00027705557,0.010964497,0.0030343249,0.0027653503,0.0022132962,0.00027886024,0.069479026],"study_design_scores_gemma":[0.000008876558,0.00078574975,0.9524545,0.00019386367,0.00013021736,0.00023149772,0.029637735,0.009828127,0.0024804352,0.0024445485,0.0017329428,0.000071461094],"about_ca_topic_score_codex":0.0015000792,"about_ca_topic_score_gemma":0.00245737,"teacher_disagreement_score":0.015552748,"about_ca_system_score_codex":0.001099485,"about_ca_system_score_gemma":0.001982113,"threshold_uncertainty_score":0.08225173},"labels":[],"label_agreement":null},{"id":"W4320917142","doi":"10.18280/ijsdp.180113","title":"Environment and Social Framework: Compromise of Interest as Social Conflicts Resolution in Infrastructure Projects","year":2023,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Compromise; Environmental resource management; Environmental planning; Business; Political science; Environmental science","score_opus":0.10398926440800788,"score_gpt":0.3567090183311588,"score_spread":0.25271975392315094,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320917142","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.938943,0.00036985203,0.0056607816,0.0014789482,0.00003585151,0.00016755555,0.000049729533,0.000011186472,0.053283185],"genre_scores_gemma":[0.99876237,0.000064140906,0.0008019373,0.00003241977,0.000004246417,0.000029332794,0.0000086557375,0.0000013983525,0.00029551482],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9902159,0.0067440704,0.00035027973,0.0004161988,0.0014394947,0.00083403493],"domain_scores_gemma":[0.99214995,0.0031151911,0.002449269,0.0003255362,0.00079494546,0.0011651303],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004915991,0.00033404538,0.00023420325,0.0018971856,0.00274086,0.0045384276,0.00067563937,0.00068589195,0.0018310552],"category_scores_gemma":[0.009658583,0.00018037045,0.00043923478,0.0013559447,0.0039381073,0.0025050857,0.0042946893,0.001007534,0.00007901716],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024556095,0.0013861716,0.5247852,0.00057478587,0.000281041,0.0019372383,0.14234914,0.004965643,0.0021142198,0.1290966,0.0023867488,0.18987764],"study_design_scores_gemma":[0.0000359947,0.00063982315,0.60009176,0.00047207702,0.0001443708,0.00090723066,0.31597802,0.010732571,0.0011362436,0.044733733,0.024998592,0.00012948031],"about_ca_topic_score_codex":0.0036198415,"about_ca_topic_score_gemma":0.008787166,"teacher_disagreement_score":0.004915991,"about_ca_system_score_codex":0.004032629,"about_ca_system_score_gemma":0.003674378,"threshold_uncertainty_score":0.029258907},"labels":[],"label_agreement":null},{"id":"W4321459780","doi":"10.3390/buildings13020571","title":"A Multi-Criteria Decision-Making Model for Selecting the Best Project Delivery Systems for Offsite Construction Projects","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Multiple-criteria decision analysis; Procurement; Interdependence; Integrated project delivery; Quality (philosophy); Process management; Process (computing); Computer science; Work (physics); Risk analysis (engineering); Flexibility (engineering); Project management; Management science; Operations research; Systems engineering; Engineering; Business","score_opus":0.17365991509844114,"score_gpt":0.41555948496454825,"score_spread":0.2418995698661071,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4321459780","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15646099,0.0012211344,0.8136594,0.0020240305,0.00019946379,0.0017406244,0.0009610267,0.00038668426,0.02334661],"genre_scores_gemma":[0.81321454,0.0007558448,0.176987,0.00020464475,0.000051287614,0.0022905774,0.0004769636,0.00003055877,0.0059886435],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970758,0.0014284716,0.00016101585,0.00052801083,0.00043397897,0.0003726757],"domain_scores_gemma":[0.9973354,0.0016811352,0.0002619629,0.000039732022,0.00045736748,0.00022441924],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052300943,0.0020906834,0.002096572,0.0034046005,0.0020163408,0.0042816997,0.0034467445,0.003953839,0.008642735],"category_scores_gemma":[0.0047154143,0.0012568651,0.0019535562,0.0027557833,0.0011477491,0.0020745983,0.0020183625,0.0022023963,0.0006160881],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010879877,0.000113634866,0.0008156041,0.00017537568,0.000072149895,0.00022133607,0.00017305597,0.98349184,0.00045058262,0.005832257,0.00048990926,0.008055457],"study_design_scores_gemma":[0.000041752992,0.00007987297,0.00022958146,0.000032625856,0.000033078257,0.00001609043,0.000096465636,0.99606234,0.00011701588,0.0028500275,0.0004231042,0.000018060442],"about_ca_topic_score_codex":0.017204147,"about_ca_topic_score_gemma":0.013915643,"teacher_disagreement_score":0.017204147,"about_ca_system_score_codex":0.0050267465,"about_ca_system_score_gemma":0.0049458453,"threshold_uncertainty_score":0.036471725},"labels":[],"label_agreement":null},{"id":"W4327971405","doi":"10.31009/leap.2022.v9.05","title":"Which Projects Count?","year":2023,"lang":"en","type":"article","venue":"Law Ethics and Philosophy","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Computer science","score_opus":0.28488186202519644,"score_gpt":0.4167742333352689,"score_spread":0.13189237131007248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4327971405","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024723044,0.0070968145,0.008969054,0.0842236,0.0045593265,0.0002389588,0.0018269222,0.0005303531,0.867832],"genre_scores_gemma":[0.5545247,0.014227043,0.010617893,0.017798107,0.0021817035,0.0011793001,0.0028771227,0.0011265636,0.39546752],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99223995,0.002542693,0.00043266857,0.0009793091,0.0020918774,0.0017135253],"domain_scores_gemma":[0.9923252,0.0010506344,0.000761468,0.0006215852,0.0017598543,0.0034812298],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035232813,0.0007763511,0.0006659815,0.003938184,0.006156521,0.024823876,0.0018857564,0.0032967348,0.059912205],"category_scores_gemma":[0.014545671,0.0005639008,0.0005704051,0.006156442,0.005512674,0.019622572,0.009319922,0.0038928622,0.021311421],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044394,0.000048896036,0.008998501,0.00033083753,0.000015469936,0.0002662316,0.015263054,0.00012217452,0.00015887478,0.5179026,0.31843033,0.13841869],"study_design_scores_gemma":[0.000010649471,0.00003564367,0.00759768,0.0006156868,0.000010801662,0.0004689239,0.036485802,0.00024183965,0.00015438434,0.096450366,0.8578865,0.000041810956],"about_ca_topic_score_codex":0.0058869203,"about_ca_topic_score_gemma":0.009299253,"teacher_disagreement_score":0.059912205,"about_ca_system_score_codex":0.003647449,"about_ca_system_score_gemma":0.0056317574,"threshold_uncertainty_score":0.20042628},"labels":[],"label_agreement":null},{"id":"W4328126975","doi":"10.1111/emre.12568","title":"A Manifesto for project management research","year":2023,"lang":"en","type":"article","venue":"European Management Review","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":125,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; University of Ottawa","funders":"","keywords":"Manifesto; Business; Management; Political science; Sociology; Economics; Law","score_opus":0.5961964340368172,"score_gpt":0.5696726229094855,"score_spread":0.02652381112733171,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4328126975","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":"methods","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":"methods","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008739465,0.007544257,0.082793616,0.372634,0.012275929,0.0011081136,0.0010900125,0.001674271,0.5121404],"genre_scores_gemma":[0.44302797,0.010574841,0.09904623,0.031100972,0.0071127526,0.0044674603,0.0020075564,0.0030927847,0.3995695],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.90239424,0.065302074,0.0044649006,0.0045290706,0.019685904,0.0036239147],"domain_scores_gemma":[0.891056,0.05990853,0.0054911333,0.018451165,0.01583437,0.009258767],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.087851174,0.00093828,0.0005414093,0.0037856824,0.012267593,0.03222008,0.003197773,0.0064344886,0.019926066],"category_scores_gemma":[0.075182565,0.000661236,0.0007947785,0.005770242,0.026855987,0.01839057,0.01766935,0.009891453,0.006054893],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018886725,0.000040439732,0.00033360315,0.00018576447,0.000005904258,0.0002187046,0.013725973,0.00027091024,0.00035502698,0.85193527,0.09608526,0.036824252],"study_design_scores_gemma":[0.0000098671735,0.000023236858,0.00020707311,0.00029672013,0.0000028960121,0.00007360956,0.0037324063,0.00019951286,0.00018522445,0.060243733,0.9350036,0.000022208616],"about_ca_topic_score_codex":0.0054130326,"about_ca_topic_score_gemma":0.0048713335,"teacher_disagreement_score":0.91214883,"about_ca_system_score_codex":0.015738558,"about_ca_system_score_gemma":0.026452657,"threshold_uncertainty_score":0.46460694},"labels":[],"label_agreement":null},{"id":"W4360601987","doi":"10.1016/j.ijproman.2023.102451","title":"Performance measurement in new product development projects: findings from successful small and medium enterprises","year":2023,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières; Université de Sherbrooke","funders":"","keywords":"Business; Process management; New product development; Product (mathematics); Context (archaeology); Small and medium-sized enterprises; Project management; Risk analysis (engineering); Operations management; Marketing; Systems engineering; Engineering; Finance","score_opus":0.1329635433472004,"score_gpt":0.34656328865514513,"score_spread":0.21359974530794473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4360601987","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99871695,0.000061754596,0.00020015342,0.000035629535,0.0000014587712,0.000026916729,0.000013664013,0.0000016916862,0.000941898],"genre_scores_gemma":[0.99931216,0.000070408205,0.00025437947,0.000014928072,0.0000025011154,0.000029245366,0.000019561465,0.0000020221896,0.0002947636],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9958191,0.0017127354,0.00033524408,0.00034843668,0.0012311937,0.0005532752],"domain_scores_gemma":[0.9604774,0.02227653,0.005872153,0.0013079024,0.0058931494,0.004172851],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0068094693,0.0002836288,0.00033432574,0.0017142538,0.0012310246,0.0016625435,0.00061283784,0.0006069463,0.00087371224],"category_scores_gemma":[0.028751474,0.00023729906,0.00033448325,0.0016800449,0.001128617,0.0010082658,0.0024475406,0.0007372887,0.00022534393],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052310416,0.0020240804,0.8663964,0.0003835614,0.00009283948,0.0007613428,0.05223042,0.0009503803,0.0026800751,0.0006376792,0.0004793114,0.07284074],"study_design_scores_gemma":[0.000018199637,0.001234324,0.95415246,0.000098450604,0.00003014337,0.00019574534,0.039862193,0.0008865508,0.0011629264,0.00025631982,0.002075021,0.000027602267],"about_ca_topic_score_codex":0.004698372,"about_ca_topic_score_gemma":0.0050405143,"teacher_disagreement_score":0.0068094693,"about_ca_system_score_codex":0.0012504975,"about_ca_system_score_gemma":0.0018672913,"threshold_uncertainty_score":0.03601235},"labels":[],"label_agreement":null},{"id":"W4364357712","doi":"10.18280/ijsdp.180302","title":"Management of Environmental and Social Risks Within Sustainable Project Finance: Solving Tensions to Enable Sustainable Development","year":2023,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"General partnership; Sustainability; Project finance; Sustainable development; Business; Risk management; Politics; Triple bottom line; Social responsibility; Social risk; Environmental resource management; Finance; Public relations; Political science; Economics; Risk analysis (engineering)","score_opus":0.06736267065484948,"score_gpt":0.34687406302795526,"score_spread":0.2795113923731058,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4364357712","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76985776,0.002765581,0.06202881,0.059735686,0.0002288615,0.0003338359,0.000049765036,0.00006127435,0.10493851],"genre_scores_gemma":[0.9921272,0.00067056064,0.0044007488,0.00039592196,0.000040614887,0.00005902785,0.000010540654,0.000010045454,0.0022855008],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.98119617,0.0134903975,0.00043064987,0.00044301443,0.002650839,0.0017889384],"domain_scores_gemma":[0.9859638,0.007438013,0.0025500632,0.00052448944,0.0012982545,0.0022252423],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.018913869,0.00037344976,0.00035864327,0.0014543799,0.006396853,0.010491937,0.0011740397,0.0028185183,0.0029591632],"category_scores_gemma":[0.017158702,0.00036712288,0.00029805902,0.0012947033,0.012012131,0.008839832,0.008809189,0.0026695125,0.00028790729],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016869942,0.0005910228,0.03712545,0.00093894784,0.00009315769,0.0036274018,0.2336068,0.0065633073,0.0038125557,0.47666278,0.0072480263,0.22956192],"study_design_scores_gemma":[0.000044574914,0.00041318237,0.027425673,0.0017250052,0.0000445858,0.0018937186,0.38808554,0.0064021596,0.0029037225,0.33339053,0.23753805,0.000133238],"about_ca_topic_score_codex":0.0017348299,"about_ca_topic_score_gemma":0.0026348787,"teacher_disagreement_score":0.018913869,"about_ca_system_score_codex":0.005246242,"about_ca_system_score_gemma":0.016573697,"threshold_uncertainty_score":0.10002726},"labels":[],"label_agreement":null},{"id":"W4365140265","doi":"10.1061/jladah.ladr-948","title":"System Dynamics as an Assistive Tool to Delay Analysis in Identifying Productivity Losses","year":2023,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Productivity; Complement (music); System dynamics; Computer science; Change order; Order (exchange); Industrial engineering; Operations research; Risk analysis (engineering); Reliability engineering; Systems engineering; Project management; Engineering; Economics; Business; Artificial intelligence; Project planning","score_opus":0.01900701687505179,"score_gpt":0.2951036740359024,"score_spread":0.2760966571608506,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4365140265","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016119486,0.00011807699,0.9804325,0.00015537057,0.000026551023,0.000063477746,0.0001467632,0.00027105556,0.0026667083],"genre_scores_gemma":[0.78491986,0.00063509867,0.21072686,0.00007799947,0.00003690011,0.00033287724,0.00029685427,0.00010805572,0.0028655953],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993236,0.0002931164,0.000045637138,0.00011199813,0.00017855637,0.0000471351],"domain_scores_gemma":[0.99657494,0.0025474809,0.0003565274,0.00014709735,0.00031998998,0.00005397684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018095985,0.0010643379,0.0006398655,0.0022744625,0.00048443058,0.001446633,0.0006351519,0.0007762468,0.0046144673],"category_scores_gemma":[0.0063214176,0.0004488349,0.00083006726,0.0010883352,0.0007210054,0.0019181818,0.0013605763,0.0013741283,0.00034426668],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048066096,0.00005226988,0.0041802367,0.00016643443,0.000048044603,0.00014003615,0.00024862878,0.91541016,0.0030568396,0.045730393,0.0006417318,0.03027712],"study_design_scores_gemma":[0.000004532495,0.00003738317,0.00046420912,0.000022945122,0.000009366261,0.000029989049,0.00008908948,0.98502177,0.0007462608,0.011837146,0.0017253137,0.0000119340875],"about_ca_topic_score_codex":0.005330959,"about_ca_topic_score_gemma":0.0031817984,"teacher_disagreement_score":0.005330959,"about_ca_system_score_codex":0.00096345413,"about_ca_system_score_gemma":0.0013727263,"threshold_uncertainty_score":0.015436947},"labels":[],"label_agreement":null},{"id":"W4367171980","doi":"10.18280/mmep.100242","title":"Assessment of Construction Risk Management Maturity Using Hybrid Fuzzy Analytical Hierarchy Process and Fuzzy Synthetic Approach: Iraq as Case Study","year":2023,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Fuzzy logic; Maturity (psychological); Hierarchy; Process (computing); Computer science; Risk analysis (engineering); Engineering; Artificial intelligence; Business; Psychology; Economics","score_opus":0.08220559521348211,"score_gpt":0.34148612464550315,"score_spread":0.25928052943202107,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4367171980","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96323717,0.0003251165,0.02796947,0.0005014454,0.000009875754,0.00036290215,0.0001133854,0.000038067574,0.0074425805],"genre_scores_gemma":[0.9664601,0.000282057,0.03211985,0.000031763655,0.0000049136097,0.00014032757,0.000056734465,0.000005021304,0.0008991724],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99799275,0.0012728932,0.00009064167,0.00010595103,0.00037276238,0.00016504091],"domain_scores_gemma":[0.9966408,0.0019485244,0.00037276204,0.00015821091,0.00076019857,0.000119486285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004388387,0.0004934933,0.00038256022,0.0026959185,0.0010718355,0.0015293718,0.0008093772,0.0011756428,0.00072584226],"category_scores_gemma":[0.0037657896,0.00023877154,0.00082873116,0.0020351463,0.0007912702,0.0010182667,0.00093151256,0.00056907063,0.00009698232],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001050331,0.003991762,0.16663098,0.0017993208,0.00040611674,0.016253522,0.038642194,0.38953093,0.02085102,0.060459238,0.0061298315,0.29425466],"study_design_scores_gemma":[0.00019860693,0.0021974966,0.07503081,0.0005951463,0.00029598156,0.0018640719,0.059178893,0.8103673,0.017127143,0.013220563,0.019660652,0.00026324668],"about_ca_topic_score_codex":0.011212797,"about_ca_topic_score_gemma":0.014767796,"teacher_disagreement_score":0.011212797,"about_ca_system_score_codex":0.0030571918,"about_ca_system_score_gemma":0.0018851471,"threshold_uncertainty_score":0.02320832},"labels":[],"label_agreement":null},{"id":"W4375866408","doi":"10.1177/87569728231158261","title":"In Search of Project Management Principles","year":2023,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Stroke Network","funders":"","keywords":"Set (abstract data type); Project management; Globe; Computer science; Program management; Management science; Process management; Engineering management; Engineering; Systems engineering; Psychology","score_opus":0.20329361656577352,"score_gpt":0.429420436407105,"score_spread":0.22612681984133146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4375866408","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09984875,0.006978806,0.5770668,0.05791826,0.001091623,0.0024243118,0.00047494992,0.0007423231,0.25345427],"genre_scores_gemma":[0.43304732,0.0037194542,0.5326054,0.0044436045,0.00025291648,0.0024207993,0.0006620038,0.0002472297,0.022601213],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9416829,0.025040407,0.0058602043,0.0026184772,0.023387145,0.0014109953],"domain_scores_gemma":[0.925119,0.033037413,0.008907649,0.006506752,0.024973374,0.001455825],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.056666393,0.0007341008,0.000771666,0.0063157585,0.004617999,0.008497351,0.0026378979,0.001994556,0.0022660766],"category_scores_gemma":[0.08076527,0.00064487715,0.00064903474,0.004296849,0.0064749797,0.007034828,0.0044235685,0.0049931724,0.0011492206],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059860908,0.00024807834,0.0061713946,0.0016733366,0.000039956132,0.0002367231,0.017976662,0.004625384,0.0017248131,0.66776055,0.01955494,0.2799283],"study_design_scores_gemma":[0.00006761426,0.00041880776,0.010888484,0.0045273295,0.000055670665,0.00065531954,0.030660136,0.008871662,0.0036061006,0.45526606,0.48481497,0.00016781258],"about_ca_topic_score_codex":0.0029283534,"about_ca_topic_score_gemma":0.004182949,"teacher_disagreement_score":0.056666393,"about_ca_system_score_codex":0.0057099205,"about_ca_system_score_gemma":0.031330477,"threshold_uncertainty_score":0.2996841},"labels":[],"label_agreement":null},{"id":"W4376136299","doi":"10.1007/s40999-023-00837-1","title":"An Integrated Framework for Selecting the Optimum Project Delivery System in Post-conflict Construction Projects","year":2023,"lang":"en","type":"article","venue":"International Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Integrated project delivery; Dynamism; Selection (genetic algorithm); Risk analysis (engineering); Index (typography); Computer science; Outcome (game theory); Management science; Project management; Range (aeronautics); Operations research; Government (linguistics); Process management; Engineering; Systems engineering; Construction engineering; Business; Artificial intelligence; Mathematics","score_opus":0.0535135683108878,"score_gpt":0.34667077816611186,"score_spread":0.2931572098552241,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4376136299","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036246978,0.0002648462,0.9536829,0.0006257772,0.000027976572,0.00048322242,0.0001685595,0.00027380814,0.008225925],"genre_scores_gemma":[0.5090134,0.0002546295,0.48779905,0.000057705227,0.00002788753,0.0005633299,0.0002769735,0.00006275413,0.0019442966],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9949916,0.0022915378,0.00030870864,0.00052998913,0.0012123176,0.0006657539],"domain_scores_gemma":[0.9970668,0.0011867245,0.000443443,0.0001226896,0.00092564785,0.00025462033],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007740357,0.0011783437,0.0016258569,0.005379409,0.0012451361,0.007042863,0.0028233563,0.0022201405,0.004195545],"category_scores_gemma":[0.008428235,0.0009908746,0.0012597344,0.0037758795,0.0014340449,0.0032831454,0.0030870975,0.0013874513,0.0004594581],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011448029,0.00028839716,0.004168929,0.00019329027,0.00014984024,0.0002449082,0.00036802035,0.8409639,0.0017873838,0.07896698,0.0018147181,0.07093911],"study_design_scores_gemma":[0.000033690707,0.00012250103,0.0013897319,0.00006601436,0.000058655627,0.000037069643,0.00033352085,0.9732308,0.00054618827,0.022444803,0.0017016417,0.000035343],"about_ca_topic_score_codex":0.01376015,"about_ca_topic_score_gemma":0.018137975,"teacher_disagreement_score":0.01376015,"about_ca_system_score_codex":0.004683449,"about_ca_system_score_gemma":0.009230068,"threshold_uncertainty_score":0.040935457},"labels":[],"label_agreement":null},{"id":"W4378652746","doi":"10.1177/87569728231172668","title":"An Integrative Review of Project Portfolio Management Literature: Thematic Findings on Sustainability Mindset, Assessment, and Integration","year":2023,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"","keywords":"Mindset; Sustainability; Portfolio; Sustainability organizations; Process management; Application portfolio management; Knowledge management; Framing (construction); Business; Project portfolio management; Management science; Project management; Engineering; Computer science; Systems engineering","score_opus":0.058462710541576195,"score_gpt":0.44193679914746736,"score_spread":0.38347408860589116,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4378652746","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015247018,0.96566486,0.004561512,0.0058023706,0.0009876917,0.00022592183,0.00029236983,0.000028389515,0.007189846],"genre_scores_gemma":[0.06159781,0.9271313,0.007011437,0.0019850992,0.00041752605,0.0004758705,0.00034687898,0.000022594695,0.001011461],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.9931358,0.0032268125,0.0015354527,0.00041392216,0.0014753777,0.00021262738],"domain_scores_gemma":[0.96990955,0.019542204,0.0029928852,0.0005877664,0.0065749795,0.00039266874],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.009274395,0.000679566,0.0014934202,0.016486304,0.0010861281,0.0036145034,0.0008829008,0.0011730258,0.00199094],"category_scores_gemma":[0.028196601,0.0004818148,0.0012043667,0.019709796,0.0010061858,0.00489139,0.00238556,0.0010187295,0.0004293523],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015407904,0.00011356797,0.0036952586,0.13725762,0.0008720086,0.00078390347,0.010135476,0.0005703764,0.0026583835,0.007853454,0.025301432,0.81060433],"study_design_scores_gemma":[0.000063871266,0.00047879547,0.033029724,0.3288867,0.0040176217,0.003941707,0.02827609,0.00072826474,0.0024371129,0.011460991,0.58651507,0.00016415589],"about_ca_topic_score_codex":0.0015974393,"about_ca_topic_score_gemma":0.0049901665,"teacher_disagreement_score":0.9835137,"about_ca_system_score_codex":0.0020899663,"about_ca_system_score_gemma":0.011060341,"threshold_uncertainty_score":0.049048245},"labels":[],"label_agreement":null},{"id":"W4379259001","doi":"10.1016/j.plas.2023.100085","title":"Climbing to the top: Personal life stories on becoming megaproject leaders","year":2023,"lang":"en","type":"article","venue":"Project Leadership and Society","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Megaproject; Professionalization; Agency (philosophy); Narrative; Public relations; Value (mathematics); Political science; Sociology; Management; Social science","score_opus":0.4107939471365792,"score_gpt":0.4205131159986586,"score_spread":0.009719168862079408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379259001","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9769164,0.0008816049,0.0016464086,0.0050148284,0.00014845139,0.0000361111,0.00007918857,0.000030062407,0.015246974],"genre_scores_gemma":[0.99540496,0.00080219185,0.0004635271,0.00050063524,0.000051358562,0.000027523914,0.000044650762,0.000024817407,0.0026803734],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9940234,0.004612104,0.000110541594,0.00020015848,0.00048005037,0.00057382986],"domain_scores_gemma":[0.9865007,0.008657625,0.0012702367,0.00039408193,0.00073471083,0.0024426635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004605109,0.00072579796,0.00040712245,0.0018175098,0.009365295,0.005255318,0.0010425727,0.0015922064,0.0027384027],"category_scores_gemma":[0.015267364,0.0005408337,0.00024809167,0.0011348947,0.0069512897,0.0062194974,0.0072536385,0.0036824655,0.0005614828],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026204505,0.000033857603,0.0052304985,0.00004133665,0.000005828821,0.00075890654,0.9851187,0.000031293283,0.00016484922,0.001100692,0.0020754386,0.005412329],"study_design_scores_gemma":[0.0000021614082,0.0000456546,0.0032786548,0.00008712149,0.000004632111,0.00044715515,0.9781155,0.00006493513,0.00020012457,0.00042973133,0.017309317,0.00001488216],"about_ca_topic_score_codex":0.0027803686,"about_ca_topic_score_gemma":0.007956084,"teacher_disagreement_score":0.009365295,"about_ca_system_score_codex":0.0015392196,"about_ca_system_score_gemma":0.0010565273,"threshold_uncertainty_score":0.024354458},"labels":[],"label_agreement":null},{"id":"W4380442580","doi":"10.29121/granthaalayah.v11.i5.2023.5160","title":"QUALITY MANAGEMENT PRACTICES IN GONDRANG-PULCHOWK SIX-LANE ROAD UPGRADING PROJECT AT CHITWAN DISTRICT, NEPAL","year":2023,"lang":"en","type":"article","venue":"International Journal of Research -GRANTHAALAYAH","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Centennial College","funders":"","keywords":"Quality (philosophy); Quality assurance; Quality management; Ranking (information retrieval); Operations management; Remedial education; Transport engineering; Business; Computer science; Engineering; Management system; Mathematics","score_opus":0.3912398408405322,"score_gpt":0.578406210753427,"score_spread":0.18716636991289481,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4380442580","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9984676,0.00009247894,0.00020658365,0.00010653422,9.3158053e-7,0.000046902493,0.00001602692,0.0000043288387,0.0010585936],"genre_scores_gemma":[0.9973078,0.00023931604,0.0008138569,0.000023604513,8.480594e-7,0.000039425377,0.000031622014,0.0000022941103,0.0015412383],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99873847,0.00043676086,0.00010080432,0.00013202873,0.00037559075,0.00021631543],"domain_scores_gemma":[0.9984086,0.0004850204,0.00046774227,0.00009798915,0.00023205367,0.00030856967],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00091855763,0.00013105066,0.0001638539,0.00083816506,0.001685793,0.0013518352,0.00085421576,0.00046095843,0.0015127871],"category_scores_gemma":[0.0020173658,0.00024585024,0.00011723215,0.001552895,0.0007888051,0.00041323024,0.00097250595,0.00034465268,0.00014642751],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015907806,0.0015425767,0.7002157,0.0008796699,0.000053295502,0.008760912,0.07599869,0.0029846134,0.017051646,0.0023181576,0.0014792694,0.18855631],"study_design_scores_gemma":[0.000021116795,0.0011085053,0.876022,0.00024099184,0.000036676967,0.0021639536,0.09985506,0.003133314,0.002886646,0.0004338643,0.014035759,0.00006205245],"about_ca_topic_score_codex":0.014580762,"about_ca_topic_score_gemma":0.037009466,"teacher_disagreement_score":0.014580762,"about_ca_system_score_codex":0.0017915043,"about_ca_system_score_gemma":0.0032714147,"threshold_uncertainty_score":0.028991759},"labels":[],"label_agreement":null},{"id":"W4381164697","doi":"10.1017/pds.2023.244","title":"LET'S TAKE THIS OFFLINE: A THEMATIC ANALYSIS OF VIRTUAL CONFLICT IN HYBRID COLLABORATIVE DESIGN TEAMS","year":2023,"lang":"en","type":"article","venue":"Proceedings of the Design Society","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Typology; Conflict management; Interpersonal communication; Thematic analysis; Task (project management); Knowledge management; Process (computing); Psychology; Teamwork; Conflict resolution research; Conflict resolution; Social psychology; Computer science; Sociology; Engineering; Political science; Qualitative research","score_opus":0.09665920891143356,"score_gpt":0.3436949806190389,"score_spread":0.24703577170760535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381164697","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94856167,0.00039816444,0.038545307,0.001880687,0.000112603215,0.0008077056,0.000711299,0.000044946348,0.00893763],"genre_scores_gemma":[0.9769687,0.00023032259,0.01952723,0.00021883065,0.00003566886,0.00078023685,0.000463636,0.000071152135,0.0017042047],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9822234,0.013019755,0.0007946632,0.0008137238,0.002244378,0.00090410217],"domain_scores_gemma":[0.95993304,0.030180175,0.002679941,0.0019549655,0.0043612407,0.00089062087],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021347022,0.00044098042,0.0005867752,0.007634291,0.006373507,0.0056883823,0.0016242361,0.0009831064,0.001449444],"category_scores_gemma":[0.038621712,0.00030679393,0.0005407404,0.007767983,0.005860911,0.004676679,0.0056540025,0.0013416008,0.00018956987],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007583143,0.000057552075,0.01120796,0.00035217585,0.000024142044,0.00058296794,0.9498087,0.0002956875,0.0021729972,0.0067949416,0.0014767817,0.02715022],"study_design_scores_gemma":[0.000007968138,0.000033958037,0.009804578,0.0002959096,0.000015758073,0.0002560354,0.9662276,0.0015943779,0.0011081534,0.006206827,0.014415995,0.000032942837],"about_ca_topic_score_codex":0.004564636,"about_ca_topic_score_gemma":0.00537266,"teacher_disagreement_score":0.021347022,"about_ca_system_score_codex":0.0038776775,"about_ca_system_score_gemma":0.0035693217,"threshold_uncertainty_score":0.11289519},"labels":[],"label_agreement":null},{"id":"W4381280393","doi":"10.1108/ijmpb-10-2020-0306","title":"Crisis management process for project-based organizations","year":2023,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Originality; Thematic analysis; Process (computing); Knowledge management; Process management; Outcome (game theory); Crisis management; Interpretation (philosophy); Conceptual model; Qualitative research; Management science; Conceptual framework; Value (mathematics); Computer science; Project management; Sociology; Management; Business; Engineering; Social science; Economics","score_opus":0.10310441339535606,"score_gpt":0.4230984241675769,"score_spread":0.3199940107722209,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381280393","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5835388,0.0058724056,0.20887579,0.028566658,0.00033789524,0.0021322048,0.00033937013,0.00042291562,0.1699141],"genre_scores_gemma":[0.97798324,0.0013365652,0.016334599,0.00026489634,0.000030914794,0.00035629518,0.00008012189,0.000013377103,0.0036000605],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9940692,0.0041156854,0.00029489436,0.00027517785,0.00090510544,0.00033982002],"domain_scores_gemma":[0.98352885,0.009606513,0.0025651718,0.0006829666,0.0024879929,0.0011284484],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008586248,0.00033313042,0.0002469683,0.0020706465,0.002596885,0.0061489316,0.00089402555,0.0012022434,0.004214671],"category_scores_gemma":[0.021560904,0.00019922851,0.00034578156,0.0019032882,0.0034655537,0.005313631,0.0038424248,0.0014773753,0.0004811686],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018900863,0.0005259865,0.035321753,0.002598662,0.0001026624,0.002827105,0.16500442,0.012715127,0.0028677958,0.47081956,0.014248071,0.29277983],"study_design_scores_gemma":[0.00008424091,0.00071578013,0.022363096,0.0034871448,0.00008727857,0.0025863855,0.38094625,0.025127858,0.003432237,0.32771298,0.23328462,0.00017211403],"about_ca_topic_score_codex":0.00096500944,"about_ca_topic_score_gemma":0.000794398,"teacher_disagreement_score":0.008586248,"about_ca_system_score_codex":0.0026675428,"about_ca_system_score_gemma":0.006449768,"threshold_uncertainty_score":0.045408964},"labels":[],"label_agreement":null},{"id":"W4381738987","doi":"10.53819/81018102t5203","title":"Funds Management and Performance of Infrastructural Projects in Canada: A Case Study of Trans-Canada Highway","year":2023,"lang":"en","type":"article","venue":"Journal of Entrepreneurship & Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université de Montréal","funders":"","keywords":"Business; Deliverable; Schedule; Stakeholder; Population; Finance; Sustainability; Strategic planning; Environmental planning; Environmental resource management; Engineering; Economics; Marketing","score_opus":0.06647033542713993,"score_gpt":0.3075659528815061,"score_spread":0.2410956174543662,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381738987","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99425477,0.0002484365,0.00026124067,0.00065998244,0.000005826752,0.00009863431,0.00019457075,0.000009156065,0.004267369],"genre_scores_gemma":[0.99602205,0.0003405493,0.00069348764,0.00007758343,0.0000023031182,0.000029385992,0.00008877585,0.00000529418,0.0027405953],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9970788,0.0006449317,0.000095639145,0.00015788423,0.00077922177,0.0012434474],"domain_scores_gemma":[0.9954332,0.0007465335,0.00047930251,0.00010698081,0.0019170197,0.0013169794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001915014,0.00042477527,0.000326042,0.0022877282,0.0098603675,0.0032389378,0.0018069097,0.001111647,0.0014343726],"category_scores_gemma":[0.0040647564,0.0003084651,0.00041696403,0.005048239,0.0022321013,0.0008627418,0.0019356782,0.0010914624,0.00012553128],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048581464,0.0014709032,0.6412501,0.00064791105,0.00015451758,0.024745198,0.18526152,0.012033917,0.004299995,0.014504939,0.010736121,0.104409024],"study_design_scores_gemma":[0.000035738827,0.00037914066,0.4809411,0.00028994025,0.00009890617,0.0015890378,0.47534564,0.008910435,0.0012832843,0.00073144585,0.030275678,0.00011966083],"about_ca_topic_score_codex":0.98918414,"about_ca_topic_score_gemma":0.9949868,"teacher_disagreement_score":0.08913361,"about_ca_system_score_codex":0.08913361,"about_ca_system_score_gemma":0.09637443,"threshold_uncertainty_score":0.64671266},"labels":[],"label_agreement":null},{"id":"W4382282777","doi":"10.1108/ijbpa-11-2022-0176","title":"Assessment of specifications' usability for engineering projects of the built environment","year":2023,"lang":"en","type":"article","venue":"International Journal of Building Pathology and Adaptation","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Usability; Originality; Bridge (graph theory); Engineering; Engineering management; Computer science; Knowledge management; Software engineering; Systems engineering; Process management; Human–computer interaction; Qualitative research","score_opus":0.16794361192875135,"score_gpt":0.3858797780744617,"score_spread":0.21793616614571037,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382282777","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9630401,0.0010378682,0.021938493,0.00059607107,0.0000346997,0.0005676146,0.00017787702,0.00012714915,0.012480199],"genre_scores_gemma":[0.98029983,0.0004664939,0.017930236,0.000070348084,0.000010658017,0.00031947868,0.00016595358,0.000033823108,0.0007032947],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9059279,0.05622599,0.009573297,0.0020333992,0.02427684,0.0019625386],"domain_scores_gemma":[0.7368184,0.1743913,0.03202637,0.012766221,0.041116163,0.0028815086],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0549843,0.0005628561,0.0007613907,0.0055965767,0.0015298467,0.005752043,0.0010748104,0.0008607067,0.0017890254],"category_scores_gemma":[0.16890305,0.00046452222,0.00081319414,0.0037845387,0.0022058496,0.0027822768,0.0039808936,0.00081335724,0.0004338701],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006650185,0.0004170829,0.3306251,0.0043805283,0.0002014382,0.0008506908,0.20999704,0.0032832087,0.007983363,0.0057124775,0.002698288,0.4331857],"study_design_scores_gemma":[0.00008288723,0.0036582465,0.47710988,0.0049129208,0.00037489104,0.002584578,0.43257573,0.009842701,0.01199252,0.0056337602,0.050710253,0.00052170263],"about_ca_topic_score_codex":0.0031614495,"about_ca_topic_score_gemma":0.0042062486,"teacher_disagreement_score":0.0549843,"about_ca_system_score_codex":0.0029259373,"about_ca_system_score_gemma":0.006024695,"threshold_uncertainty_score":0.29078823},"labels":[],"label_agreement":null},{"id":"W4382787636","doi":"10.3390/buildings13071666","title":"A Holistic Framework for Assessing the Quality of Building Construction in Saudi Arabia","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Analytic hierarchy process; Pairwise comparison; Quality (philosophy); Normalization (sociology); Consistency (knowledge bases); Computer science; Process (computing); Quality function deployment; Engineering; Risk analysis (engineering); Construction engineering; Operations research; Operations management; Artificial intelligence; Business","score_opus":0.2278063676465856,"score_gpt":0.48554636727139555,"score_spread":0.25773999962481,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382787636","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38310763,0.009312919,0.41403222,0.0059745167,0.0001905637,0.0022838179,0.001492537,0.0003349502,0.18327087],"genre_scores_gemma":[0.80317664,0.0018735465,0.19157453,0.00011846024,0.000014610382,0.00039718088,0.00032552713,0.000012958779,0.002506518],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99525476,0.0020308623,0.0005030473,0.00023313847,0.0016539699,0.00032426402],"domain_scores_gemma":[0.9971443,0.0007359232,0.00040357502,0.00012446614,0.0014061241,0.00018566709],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0050766184,0.0008292683,0.00041748627,0.0076925233,0.0013984864,0.006037561,0.0009423012,0.0006528258,0.0018337858],"category_scores_gemma":[0.0045807734,0.00029295916,0.0008317025,0.004551006,0.0021590248,0.0027174447,0.0031631347,0.0006735714,0.00019655563],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002093406,0.00036122138,0.05927053,0.0023959922,0.00031186777,0.001079689,0.02537814,0.05514332,0.0067144316,0.3809384,0.008291509,0.45990553],"study_design_scores_gemma":[0.00008990254,0.0011762502,0.1839894,0.0052417046,0.00059925026,0.002170825,0.16481149,0.25754568,0.007314096,0.1967041,0.1798586,0.00049872015],"about_ca_topic_score_codex":0.028247619,"about_ca_topic_score_gemma":0.034413025,"teacher_disagreement_score":0.028247619,"about_ca_system_score_codex":0.008038201,"about_ca_system_score_gemma":0.007829534,"threshold_uncertainty_score":0.058321536},"labels":[],"label_agreement":null},{"id":"W4383682266","doi":"10.35490/ec3.2023.234","title":"Barriers to circularity in construction: an analysis of experts’ perspectives","year":2023,"lang":"en","type":"article","venue":"Computing in construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Categorization; Demolition; Deconstruction (building); Computer science; Process management; Action (physics); Knowledge management; Data science; Risk analysis (engineering); Management science; Engineering; Business; Artificial intelligence; Civil engineering","score_opus":0.08172385211230546,"score_gpt":0.397254622325472,"score_spread":0.31553077021316656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383682266","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9728741,0.0006873705,0.0051979125,0.0034825138,0.00004217579,0.00018633727,0.00005782344,0.000012411679,0.017459221],"genre_scores_gemma":[0.99690515,0.0006066363,0.0013770828,0.0002632172,0.000014004464,0.00006848498,0.0000344964,0.000009371698,0.00072146615],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9621652,0.023180993,0.0019635232,0.0014656336,0.0070883045,0.0041363896],"domain_scores_gemma":[0.8837308,0.08998931,0.007748033,0.0019827483,0.012511324,0.0040378324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.040143233,0.00047287627,0.0006889215,0.007320675,0.0069423392,0.0069751414,0.001511484,0.0022597667,0.0015656584],"category_scores_gemma":[0.06822222,0.00065357226,0.0005955336,0.0047682407,0.008423378,0.0055449824,0.0073292977,0.0025530583,0.00016866723],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000079340876,0.000057620186,0.020736326,0.0004261327,0.00002499242,0.00066076516,0.94694096,0.00033111326,0.00088982005,0.011422472,0.0010137212,0.017416742],"study_design_scores_gemma":[0.000006743536,0.00005150912,0.012281008,0.00042943083,0.000019538504,0.00023761403,0.97239316,0.00069753575,0.0003586732,0.002357123,0.011124209,0.00004353881],"about_ca_topic_score_codex":0.011619289,"about_ca_topic_score_gemma":0.011479485,"teacher_disagreement_score":0.040143233,"about_ca_system_score_codex":0.007879033,"about_ca_system_score_gemma":0.011498742,"threshold_uncertainty_score":0.21230024},"labels":[],"label_agreement":null},{"id":"W4383912296","doi":"10.1142/9789811224720_0003","title":"Imported Project Management Practices in Developing Countries: The Problem of Insufficient Adaptation to Local Project Governance Systems in the Construction Sector","year":2023,"lang":"en","type":"book-chapter","venue":"WORLD SCIENTIFIC eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"","keywords":"Adaptation (eye); Corporate governance; Business; Project management; Process management; Environmental planning; Environmental resource management; Management; Geography; Economics; Finance","score_opus":0.15904169498911805,"score_gpt":0.35020403303107756,"score_spread":0.1911623380419595,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383912296","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88542193,0.006104582,0.010423589,0.020874549,0.00017272099,0.00022263001,0.00021001119,0.00007811563,0.07649197],"genre_scores_gemma":[0.99199593,0.0020914748,0.0034424842,0.0011962124,0.000015874097,0.000115534036,0.000058671485,0.00003205304,0.0010517322],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9862185,0.008669643,0.0012241714,0.001046364,0.0017434594,0.0010977039],"domain_scores_gemma":[0.984993,0.007090349,0.0027287595,0.0024125928,0.0018930285,0.0008823177],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016718384,0.000342322,0.0005048287,0.0016640106,0.0042023496,0.004983487,0.0009693141,0.00069031614,0.0020463325],"category_scores_gemma":[0.022563858,0.00056067365,0.00028541696,0.0041394625,0.010895419,0.0026665155,0.0066516027,0.0019203129,0.00026081456],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010623654,0.0001171957,0.17318003,0.0018158238,0.00008930832,0.0030739934,0.45860288,0.0018281912,0.0012595988,0.08982856,0.008122385,0.2619758],"study_design_scores_gemma":[0.00005579462,0.00018239128,0.24558257,0.0044253967,0.00007763444,0.0028223677,0.56396246,0.0009728388,0.0012224198,0.02959375,0.1509932,0.00010915214],"about_ca_topic_score_codex":0.020626778,"about_ca_topic_score_gemma":0.024620678,"teacher_disagreement_score":0.020626778,"about_ca_system_score_codex":0.005436124,"about_ca_system_score_gemma":0.009563648,"threshold_uncertainty_score":0.08841634},"labels":[],"label_agreement":null},{"id":"W4383957356","doi":"10.24928/2023/0119","title":"A Framework for Design Waste Mitigation in Off-Site Construction","year":2023,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Process (computing); Construction waste; Risk analysis (engineering); Construction industry; Product (mathematics); Order (exchange); Computer science; Engineering; Systems engineering; Construction engineering; Waste management; Business","score_opus":0.11416828818954783,"score_gpt":0.36092362241251147,"score_spread":0.24675533422296364,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383957356","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013710584,0.001187331,0.9717187,0.0015908387,0.00010175543,0.0003721333,0.00009359222,0.00025585166,0.023308683],"genre_scores_gemma":[0.04811611,0.0017978499,0.94211257,0.00027992963,0.00007538509,0.0011593502,0.0002431737,0.000083328305,0.0061323894],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.992161,0.004606906,0.0005282154,0.0006254422,0.0016142054,0.0004642383],"domain_scores_gemma":[0.99612087,0.0020236059,0.00034052788,0.00035212433,0.0008914049,0.0002713685],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010234875,0.002608729,0.0009671532,0.0049997526,0.0022440741,0.0074952166,0.0053201956,0.004299435,0.0057863523],"category_scores_gemma":[0.0071870373,0.0009688123,0.0024265794,0.0032882735,0.0077877366,0.0050127143,0.004396534,0.0032546842,0.0015525358],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012278817,0.0000678805,0.0001953597,0.00021080393,0.000016546008,0.00019691089,0.00064391555,0.07185196,0.00039652598,0.90140873,0.0015607008,0.023438418],"study_design_scores_gemma":[0.0000364236,0.00010847367,0.00018885823,0.0006974712,0.00003645415,0.00016991301,0.00087913586,0.17377919,0.0006361183,0.72568303,0.09773323,0.000051666877],"about_ca_topic_score_codex":0.014527617,"about_ca_topic_score_gemma":0.013182101,"teacher_disagreement_score":0.014527617,"about_ca_system_score_codex":0.007021613,"about_ca_system_score_gemma":0.009391916,"threshold_uncertainty_score":0.054127872},"labels":[],"label_agreement":null},{"id":"W4383957508","doi":"10.24928/2023/0205","title":"Collaborative Dialogue During the Pre-Tendering Phase to Maximize Project Value Generation","year":2023,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Procurement; Phase (matter); Value (mathematics); Computer science; Business; Physics; Marketing","score_opus":0.09419675737339879,"score_gpt":0.37559748464558546,"score_spread":0.2814007272721867,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383957508","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21466541,0.0012989313,0.65219986,0.0049520303,0.0005065079,0.0050378726,0.00011630731,0.0011088246,0.12011421],"genre_scores_gemma":[0.81083673,0.0005389335,0.16552041,0.0006675987,0.00016022351,0.0028179018,0.00014390572,0.00020201814,0.019112209],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9646645,0.026279107,0.0008303088,0.0018625432,0.004243337,0.0021201265],"domain_scores_gemma":[0.95838493,0.030071292,0.0024134254,0.002664523,0.0036506995,0.0028152165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.026891358,0.0011125946,0.0008056885,0.0014755187,0.0046739145,0.006112929,0.0025532697,0.002774465,0.009126245],"category_scores_gemma":[0.037030585,0.00072800287,0.0008745743,0.0011407221,0.0032180913,0.007164145,0.009470126,0.0031290029,0.0027155445],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012375865,0.0024361566,0.0062584532,0.0026265662,0.00011031113,0.0032841442,0.37497348,0.0073926076,0.050557602,0.13320231,0.018128507,0.39979228],"study_design_scores_gemma":[0.000618071,0.0036278258,0.016433973,0.0029972524,0.00019503725,0.0035002402,0.23140658,0.0347967,0.03953548,0.16918243,0.49723482,0.0004715333],"about_ca_topic_score_codex":0.00067164004,"about_ca_topic_score_gemma":0.0010260092,"teacher_disagreement_score":0.026891358,"about_ca_system_score_codex":0.0022735535,"about_ca_system_score_gemma":0.0063367025,"threshold_uncertainty_score":0.14221686},"labels":[],"label_agreement":null},{"id":"W4383957612","doi":"10.24928/2023/0107","title":"A Fuzzy Framework for Contractor Selection on IPD Projects","year":2023,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Selection (genetic algorithm); Fuzzy logic; Computer science; Operations research; Artificial intelligence; Engineering","score_opus":0.12636529325728685,"score_gpt":0.3742435520194455,"score_spread":0.24787825876215863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383957612","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016835438,0.0011161645,0.94815564,0.0010554307,0.00008497995,0.0004041543,0.00021020227,0.00007447212,0.032063466],"genre_scores_gemma":[0.45063978,0.0014865203,0.54134065,0.0001453058,0.00008871387,0.0006493371,0.00020632424,0.00002224865,0.0054212175],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9936241,0.0035229328,0.0004125245,0.0006408225,0.0014319111,0.00036759526],"domain_scores_gemma":[0.9956418,0.0028640549,0.00038481894,0.00014067898,0.00073096104,0.00023759523],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008129925,0.0010269788,0.0007378032,0.005890622,0.0022058298,0.0047135083,0.0020310925,0.0016844054,0.0051785973],"category_scores_gemma":[0.008556919,0.0004611546,0.0014195031,0.0040784325,0.003369399,0.0035853789,0.0018408238,0.0016477016,0.00052245456],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000095397845,0.00012064341,0.0024932458,0.00037634533,0.00006811752,0.00075973227,0.0021220376,0.1654696,0.0011868441,0.7555212,0.0021675767,0.06961929],"study_design_scores_gemma":[0.000063229454,0.00020721683,0.0018225093,0.0005771166,0.000073545394,0.0004227957,0.0024451867,0.5865481,0.0009997229,0.38290355,0.023801059,0.00013601696],"about_ca_topic_score_codex":0.017656304,"about_ca_topic_score_gemma":0.01896713,"teacher_disagreement_score":0.017656304,"about_ca_system_score_codex":0.0058952705,"about_ca_system_score_gemma":0.0044785817,"threshold_uncertainty_score":0.04299569},"labels":[],"label_agreement":null},{"id":"W4383957625","doi":"10.24928/2023/0111","title":"Developing a Framework for Assessing Team Alignment in Construction Using TVD","year":2023,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science","score_opus":0.18873046388779127,"score_gpt":0.41579127388838366,"score_spread":0.2270608100005924,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383957625","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038829114,0.0010102608,0.91844094,0.0017589184,0.00014313187,0.002872051,0.0006711089,0.00048450637,0.0357899],"genre_scores_gemma":[0.20520706,0.00035360781,0.7902585,0.000108224005,0.00001719051,0.0025555508,0.00047287074,0.000026474603,0.0010003778],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97474784,0.015746018,0.0027856368,0.0017713899,0.0037499035,0.0011992506],"domain_scores_gemma":[0.9798384,0.011876809,0.0025682757,0.0008313467,0.004062577,0.00082248915],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.018852644,0.001650791,0.0010366692,0.012856567,0.0028034106,0.008081711,0.0025969432,0.0020373506,0.0033580572],"category_scores_gemma":[0.025580328,0.00077243405,0.0024633904,0.00814066,0.00583936,0.005967741,0.006673039,0.0021817612,0.00066382607],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019414883,0.0008855559,0.085582584,0.002416098,0.00037147486,0.0007970379,0.036427237,0.047847975,0.003356162,0.45986864,0.0058696326,0.35638353],"study_design_scores_gemma":[0.0002616187,0.0012653967,0.07089322,0.0050529465,0.00050618354,0.001066074,0.088290244,0.30636048,0.005433792,0.38831973,0.13196696,0.00058328855],"about_ca_topic_score_codex":0.020906342,"about_ca_topic_score_gemma":0.021538379,"teacher_disagreement_score":0.020906342,"about_ca_system_score_codex":0.012227502,"about_ca_system_score_gemma":0.009915505,"threshold_uncertainty_score":0.09970349},"labels":[],"label_agreement":null},{"id":"W4385449569","doi":"10.1139/cjce-2022-0425","title":"Integrated FAHP-FDEMATEL for determining causal relationships in construction crew productivity modelling","year":2023,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","funders":"","keywords":"Crew; Productivity; Situational ethics; Operations research; Hierarchy; Process (computing); Computer science; Fuzzy set; Fuzzy logic; Set (abstract data type); Knowledge management; Operations management; Management science; Engineering; Artificial intelligence; Psychology; Aeronautics","score_opus":0.13469081836872024,"score_gpt":0.2994031552403973,"score_spread":0.16471233687167705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385449569","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021338377,0.0000950676,0.9732876,0.000111769,0.000011446902,0.00019405405,0.0007551135,0.00055076944,0.0036558704],"genre_scores_gemma":[0.31998172,0.00012683654,0.6766352,0.0000338358,0.000008616933,0.0006695973,0.0008621204,0.000044268294,0.0016377724],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99843997,0.00075610384,0.00011676929,0.0002309566,0.00032021877,0.00013606714],"domain_scores_gemma":[0.99499524,0.00406682,0.00023632696,0.00021434641,0.00041866014,0.00006862458],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036461393,0.0007346296,0.00073189416,0.0033607571,0.000784077,0.0020585153,0.001217176,0.00094037247,0.007372341],"category_scores_gemma":[0.012152698,0.0005201396,0.001500119,0.002187322,0.0005936097,0.0012791309,0.0018821493,0.000978591,0.00041806255],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015916178,0.00016788229,0.011692186,0.00028343825,0.00023847577,0.00034717546,0.0007217002,0.76544875,0.0018414303,0.07060621,0.0012246408,0.1472689],"study_design_scores_gemma":[0.000016455624,0.000029239212,0.0013586686,0.000040008854,0.000042559685,0.000045779692,0.00018557848,0.9749502,0.000709186,0.020041373,0.0025634312,0.00001746999],"about_ca_topic_score_codex":0.039530132,"about_ca_topic_score_gemma":0.035719078,"teacher_disagreement_score":0.039530132,"about_ca_system_score_codex":0.0018722678,"about_ca_system_score_gemma":0.0040552025,"threshold_uncertainty_score":0.07860005},"labels":[],"label_agreement":null},{"id":"W4385520378","doi":"10.1139/cjce-2022-0310","title":"Analysing delay factors in construction projects using Z-number approach: insights from Pakistan","year":2023,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Procurement; Cost overrun; Prioritization; Project management; Reliability (semiconductor); Government (linguistics); Integrated project delivery; Construction industry; Risk analysis (engineering); Computer science; Business; Operations management; Engineering; Process management; Construction engineering; Systems engineering; Marketing","score_opus":0.07367866405946424,"score_gpt":0.3035676572953858,"score_spread":0.22988899323592157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385520378","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96898055,0.0012858376,0.016274258,0.00046396116,0.000017672613,0.00019081602,0.0004913071,0.00001676105,0.01227889],"genre_scores_gemma":[0.9910245,0.0012415741,0.006867581,0.000027004384,0.000004773595,0.000048236707,0.00017067378,0.000004429842,0.0006112879],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9982413,0.0005257056,0.00019976677,0.00015793013,0.00068073906,0.00019447149],"domain_scores_gemma":[0.987118,0.007939146,0.0019090364,0.00016080229,0.002667841,0.00020511767],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002935158,0.00037302458,0.00037026286,0.0054559563,0.0010840435,0.0019284639,0.0005294616,0.000366425,0.0015118755],"category_scores_gemma":[0.009730405,0.00024684824,0.000380781,0.007221621,0.0008803848,0.0019264047,0.0012431879,0.0005713571,0.00019072785],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039855097,0.00028152307,0.5903477,0.003214673,0.00015136537,0.005805315,0.043335393,0.027339622,0.0037031088,0.027462067,0.0025223235,0.2954383],"study_design_scores_gemma":[0.000044760458,0.0008123695,0.5952661,0.001500538,0.0003072467,0.002068796,0.26588207,0.06551628,0.0053086155,0.022264898,0.040807642,0.00022069429],"about_ca_topic_score_codex":0.03779271,"about_ca_topic_score_gemma":0.05436794,"teacher_disagreement_score":0.03779271,"about_ca_system_score_codex":0.0039611747,"about_ca_system_score_gemma":0.0051659835,"threshold_uncertainty_score":0.07514548},"labels":[],"label_agreement":null},{"id":"W4385777037","doi":"10.5267/j.jpm.2023.6.002","title":"Incentive mechanisms for managing local subcontractors in international construction projects","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Natural Science Foundation of China; National Science Foundation","keywords":"Incentive; Procurement; Business; Structural equation modeling; Finance; Industrial organization; Marketing; Economics; Microeconomics; Computer science","score_opus":0.08358511607495982,"score_gpt":0.3829345402635442,"score_spread":0.29934942418858435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385777037","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91825867,0.0005874164,0.04028223,0.0015030712,0.000042270538,0.00070280913,0.000071211594,0.00008654586,0.038465764],"genre_scores_gemma":[0.9951546,0.00009970429,0.0037978012,0.000029351864,0.000008920697,0.000108140805,0.000009987363,0.000003709972,0.0007876675],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9910041,0.005989062,0.00042985077,0.00047822134,0.0010868101,0.0010119042],"domain_scores_gemma":[0.9757078,0.01175906,0.007885435,0.0010899291,0.0017117753,0.0018458898],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013200405,0.0004481148,0.00032541258,0.0016164598,0.0017522108,0.0032949457,0.0010555178,0.0007485838,0.0042003947],"category_scores_gemma":[0.02462947,0.00031422218,0.00031696138,0.0012247815,0.0021328938,0.0024207032,0.0037439263,0.00082462165,0.00023961352],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00079689507,0.002395703,0.30441988,0.0010486513,0.0003560623,0.0012390175,0.014309688,0.06664727,0.010235007,0.25216192,0.003327494,0.3430623],"study_design_scores_gemma":[0.00037733506,0.0029977807,0.5792038,0.0013520209,0.00048643842,0.00077900954,0.04327054,0.12326566,0.009641567,0.16679087,0.071379885,0.0004551634],"about_ca_topic_score_codex":0.0020182224,"about_ca_topic_score_gemma":0.0055770134,"teacher_disagreement_score":0.013200405,"about_ca_system_score_codex":0.0033337495,"about_ca_system_score_gemma":0.0060215183,"threshold_uncertainty_score":0.069811225},"labels":[],"label_agreement":null},{"id":"W4385777078","doi":"10.5267/j.jpm.2023.8.001","title":"Moderation role of government acts, laws and policies between economic factors and risk management: A case study of Saudi Arabia contractors","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Risk management; Business; Workforce; Abandonment (legal); Risk analysis (engineering); Finance; Economics; Economic growth","score_opus":0.06072112255725954,"score_gpt":0.3459567501485912,"score_spread":0.28523562759133164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385777078","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.999308,0.000025091527,0.000095371164,0.000061824685,6.980625e-7,0.000010624067,0.00000688536,4.1410377e-7,0.0004911289],"genre_scores_gemma":[0.999453,0.000049459282,0.0001412106,0.000012928607,0.0000011606046,0.0000069903554,0.0000076115575,5.8563865e-7,0.00032708506],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9975834,0.0015814118,0.00009621674,0.00012461717,0.00021560767,0.00039880007],"domain_scores_gemma":[0.99007916,0.006892953,0.0012140671,0.00026925717,0.000808151,0.0007365126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003698238,0.00023937627,0.000261428,0.00077072345,0.0023093093,0.0019104513,0.0005527233,0.0007525807,0.0020203202],"category_scores_gemma":[0.006344123,0.0002176054,0.00029115734,0.0006674796,0.0012109055,0.0007740765,0.0010888968,0.0008576404,0.00015521086],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000558079,0.002393011,0.7730218,0.00016431912,0.00011415175,0.00940626,0.1735644,0.001895806,0.0016988032,0.0054234467,0.00078478287,0.03097513],"study_design_scores_gemma":[0.00006540666,0.0009245134,0.41246632,0.00020017225,0.0001231142,0.0016209214,0.5631959,0.011415145,0.0015934905,0.0010751409,0.007244896,0.000075105905],"about_ca_topic_score_codex":0.042694476,"about_ca_topic_score_gemma":0.049527537,"teacher_disagreement_score":0.042694476,"about_ca_system_score_codex":0.0021627396,"about_ca_system_score_gemma":0.0028355091,"threshold_uncertainty_score":0.084891915},"labels":[],"label_agreement":null},{"id":"W4385777161","doi":"10.5267/j.jpm.2023.5.001","title":"Assessment of the impact of disregarding influencing factors on artisans performance in building construction projects in Tanzania","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workmanship; Tanzania; Productivity; Construction industry; Process (computing); Quality (philosophy); Business; Building construction; Enforcement; Structural equation modeling; Engineering; Operations management; Computer science; Construction engineering; Mathematics; Economic growth; Economics; Environmental planning; Geography; Political science; Statistics","score_opus":0.07623431305462511,"score_gpt":0.402426235617294,"score_spread":0.32619192256266893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385777161","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9988366,0.00004710966,0.00015126518,0.00005207815,0.0000031384893,0.000010437267,0.000012264117,0.0000017265505,0.00088552106],"genre_scores_gemma":[0.99970657,0.00002681932,0.00011607032,0.0000053842155,0.0000016792764,0.0000050932367,0.000010639997,8.4460345e-7,0.00012691508],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9928422,0.0034563125,0.0004588478,0.00037258197,0.0017339722,0.0011361163],"domain_scores_gemma":[0.98123115,0.007245677,0.0065444196,0.0010283423,0.0023339756,0.0016164547],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0065860427,0.00035302693,0.00032342447,0.0007724138,0.0015329958,0.0014196383,0.00048000886,0.00035086766,0.0015638996],"category_scores_gemma":[0.018479798,0.00020587408,0.00030979898,0.0007655596,0.0016743197,0.0004977989,0.0016619421,0.00060130615,0.00021597928],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002166607,0.00021539697,0.9563838,0.00013401601,0.00006710306,0.0005209201,0.010131747,0.0011172874,0.0018609802,0.0004431595,0.00029845533,0.028610488],"study_design_scores_gemma":[0.0000028004984,0.00028599933,0.98369414,0.00006199875,0.000031662355,0.00009813589,0.013624119,0.00088461733,0.00048808617,0.00011985302,0.0006948694,0.000013716935],"about_ca_topic_score_codex":0.011744817,"about_ca_topic_score_gemma":0.030781008,"teacher_disagreement_score":0.011744817,"about_ca_system_score_codex":0.0018156421,"about_ca_system_score_gemma":0.0027863334,"threshold_uncertainty_score":0.03483075},"labels":[],"label_agreement":null},{"id":"W4385859426","doi":"10.1007/978-3-031-34593-7_22","title":"Construction Payment Problems: A Critical Review of Payment Problems, Prompt Payment Legislation, and Challenges","year":2023,"lang":"en","type":"review","venue":"Lecture notes in civil engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Legislation; Payment; Business; Resource (disambiguation); Actuarial science; Risk analysis (engineering); Finance; Computer science; Law; Political science","score_opus":0.14940233348642315,"score_gpt":0.36405724522847643,"score_spread":0.21465491174205328,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859426","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000094145464,0.9941725,0.00021184103,0.004420272,0.00041166585,0.000015129355,0.00003706521,0.0000045888896,0.0006327415],"genre_scores_gemma":[0.0010299629,0.99630725,0.00042070867,0.001691442,0.0003375689,0.000025679783,0.000039278624,0.000003935659,0.00014415671],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9912203,0.0023628927,0.0015385611,0.00065521424,0.003842654,0.00038035997],"domain_scores_gemma":[0.94726676,0.033123218,0.005178662,0.00071721326,0.013018012,0.0006961673],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017961591,0.0013044272,0.0030400571,0.011609678,0.0010449244,0.005064247,0.0027554545,0.004262736,0.004116733],"category_scores_gemma":[0.03930545,0.0012271368,0.0015428565,0.01491584,0.0031675547,0.006090428,0.0028122347,0.0043506157,0.0011197451],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008108311,0.000080790116,0.00047677374,0.051774766,0.00020758306,0.00010013326,0.00019256311,0.0006275667,0.00019442834,0.023850173,0.12166491,0.80074924],"study_design_scores_gemma":[0.00003110785,0.00009758893,0.0016766742,0.07684237,0.00035489182,0.00031911934,0.00036660628,0.00020549085,0.00020582958,0.0062942836,0.9135542,0.00005195558],"about_ca_topic_score_codex":0.009775463,"about_ca_topic_score_gemma":0.018815532,"teacher_disagreement_score":0.017961591,"about_ca_system_score_codex":0.008428243,"about_ca_system_score_gemma":0.024938885,"threshold_uncertainty_score":0.09499109},"labels":[],"label_agreement":null},{"id":"W4385859451","doi":"10.1007/978-3-031-34593-7_23","title":"Gap Analysis and Areas of Improvement for the CCDC 30: 2018 Integrated Project Delivery Contract","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Documentation; Context (archaeology); Integrated project delivery; Schedule; Incentive; Project management; Business; Architecture; Project team; Public relations; Operations management; Process management; Engineering; Knowledge management; Political science; Management; Computer science; Economics; Geography","score_opus":0.05251565826824925,"score_gpt":0.29660327658642666,"score_spread":0.2440876183181774,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859451","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25432187,0.005923415,0.3744298,0.014740568,0.000864504,0.0014041128,0.0039714077,0.00091469067,0.34342965],"genre_scores_gemma":[0.8252687,0.0014609287,0.14039841,0.00041749468,0.00012471955,0.0007472069,0.0021399683,0.00031492612,0.029127607],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9931612,0.00213059,0.0003214425,0.00051135005,0.003052955,0.00082247064],"domain_scores_gemma":[0.9884349,0.005480791,0.0006893819,0.00071191974,0.004244674,0.00043820572],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011997738,0.0004391749,0.00078028644,0.0028822182,0.001535643,0.0067026378,0.0018047635,0.0022996692,0.018209985],"category_scores_gemma":[0.027983945,0.0003251006,0.0008714197,0.004109906,0.0012752473,0.005042684,0.0023693463,0.0023436106,0.0014109341],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005893856,0.00030904854,0.00798318,0.00040536863,0.000030184467,0.000100303056,0.0011558356,0.04097111,0.0010013278,0.6240409,0.03315402,0.29025936],"study_design_scores_gemma":[0.00014487823,0.00065633364,0.030820254,0.0012212304,0.00011434315,0.00026828024,0.008835629,0.34572116,0.004062201,0.46920618,0.13882335,0.00012621112],"about_ca_topic_score_codex":0.021036733,"about_ca_topic_score_gemma":0.016785607,"teacher_disagreement_score":0.021036733,"about_ca_system_score_codex":0.00821988,"about_ca_system_score_gemma":0.013995906,"threshold_uncertainty_score":0.06345087},"labels":[],"label_agreement":null},{"id":"W4385883360","doi":"10.1007/978-3-031-28739-8","title":"The Role of Design, Construction, and Real Estate in Advancing the Sustainable Development Goals","year":2023,"lang":"en","type":"book","venue":"Sustainable development goals series","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; Concordia University","funders":"Social Sciences and Humanities Research Council of Canada; American University in Cairo; Concordia University","keywords":"Real estate; Real estate development; Sustainable development; Business; Architectural engineering; Environmental planning; Construction engineering; Process management; Engineering; Political science; Geography; Finance","score_opus":0.020306036593021524,"score_gpt":0.2773882863015949,"score_spread":0.25708224970857335,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385883360","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0024100335,0.06834228,0.021438,0.018770492,0.0014902124,0.00004523301,0.000112086425,0.0000947861,0.8872968],"genre_scores_gemma":[0.13401064,0.16640165,0.046687216,0.005310929,0.002135962,0.00027184823,0.0002944815,0.000223201,0.6446641],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99862385,0.0004476831,0.000032005988,0.000048723734,0.0007823041,0.00006553244],"domain_scores_gemma":[0.9984767,0.0011184268,0.00006972577,0.00005947654,0.00018991933,0.00008564099],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016181583,0.00049182546,0.00038191726,0.0007977943,0.000780918,0.005731901,0.0005433094,0.0011019895,0.010852661],"category_scores_gemma":[0.002439762,0.0003051909,0.00020208494,0.0017934394,0.0031289433,0.0035640365,0.0015468929,0.00240544,0.0022380766],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012662441,0.000035298624,0.00026279973,0.00017140528,0.0000042133033,0.00003475289,0.0004915386,0.002338591,0.00024722904,0.71555334,0.12590438,0.1549437],"study_design_scores_gemma":[0.0000035781318,0.000014135601,0.0005891539,0.00021894995,0.0000024971075,0.000058404443,0.0004975559,0.0015302037,0.00016150762,0.2650686,0.7318465,0.000008864952],"about_ca_topic_score_codex":0.00592172,"about_ca_topic_score_gemma":0.017107947,"teacher_disagreement_score":0.010852661,"about_ca_system_score_codex":0.0025304444,"about_ca_system_score_gemma":0.0044751028,"threshold_uncertainty_score":0.036305785},"labels":[],"label_agreement":null},{"id":"W4386016570","doi":"10.1108/lodj-12-2022-0553","title":"Project leader's interactive use of controls, team learning behaviour and IT project performance: the moderating role of process accountability","year":2023,"lang":"en","type":"article","venue":"Leadership & Organization Development Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Guelph","funders":"","keywords":"Accountability; Mediation; Project team; Originality; Knowledge management; Psychology; Process (computing); Formative assessment; Project management; Control (management); Process management; Business; Social psychology; Sociology; Political science; Management; Computer science; Pedagogy","score_opus":0.18392054320822668,"score_gpt":0.3667021761325785,"score_spread":0.18278163292435182,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386016570","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99653256,0.000048598846,0.0011033308,0.00013424216,0.000004046207,0.000034971235,0.000017942655,0.000012779466,0.0021114806],"genre_scores_gemma":[0.9994715,0.000021094826,0.00027265833,0.000014695894,0.0000024273547,0.000018955483,0.000009158321,0.0000026176845,0.0001870238],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98790133,0.007708177,0.00039893677,0.0006238906,0.0020429543,0.0013247672],"domain_scores_gemma":[0.9377913,0.034094486,0.015934536,0.0024682025,0.005209685,0.004501717],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007733837,0.0002653737,0.00021927159,0.0005614929,0.0010205781,0.0021513032,0.0004526549,0.00029806927,0.001704556],"category_scores_gemma":[0.0384158,0.00020813101,0.00015179474,0.0004486666,0.001584725,0.00074287056,0.0017804328,0.0008187703,0.0001408757],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002684962,0.00059447525,0.8960102,0.00013158692,0.00009221349,0.0001811672,0.042370643,0.00060693227,0.002352664,0.00090597256,0.0005391931,0.055946425],"study_design_scores_gemma":[0.000029380959,0.0005532309,0.96291286,0.000106081236,0.000045582736,0.00010880628,0.030120466,0.0015398767,0.0013174057,0.0007214472,0.0025147554,0.000030133006],"about_ca_topic_score_codex":0.01799918,"about_ca_topic_score_gemma":0.02121554,"teacher_disagreement_score":0.01799918,"about_ca_system_score_codex":0.0014606146,"about_ca_system_score_gemma":0.0049523828,"threshold_uncertainty_score":0.040900946},"labels":[],"label_agreement":null},{"id":"W4386283218","doi":"10.18280/mmep.100437","title":"Total Quality Management’s Critical Role in Resolving Delay Issue of Construction Projects Submission","year":2023,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Total quality management; Business; Quality (philosophy); Process management; Operations management; Computer science; Engineering; Marketing; Epistemology; Philosophy","score_opus":0.08959769496806795,"score_gpt":0.3379753204890286,"score_spread":0.24837762552096065,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386283218","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35290515,0.028090484,0.27700374,0.13946755,0.00475737,0.00082429516,0.00040208048,0.0017318914,0.19481744],"genre_scores_gemma":[0.93949574,0.004061126,0.040897686,0.003306564,0.00051117013,0.00013749608,0.00011558196,0.00018695739,0.01128769],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.98037857,0.0067295176,0.0013292581,0.0013266094,0.008918742,0.0013173613],"domain_scores_gemma":[0.9512014,0.015411172,0.008762685,0.0023683007,0.018595574,0.0036608549],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022141343,0.00040235426,0.00047981238,0.0024595114,0.003712466,0.010147525,0.0014399594,0.0017536602,0.0065638423],"category_scores_gemma":[0.051215794,0.00041162674,0.00057469716,0.0035473157,0.0026544111,0.0052330378,0.004092996,0.0029732469,0.0005958856],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027618077,0.0002508066,0.03950036,0.0022719,0.00021271457,0.0008241859,0.021858934,0.007291451,0.006642502,0.12399502,0.03892564,0.75795037],"study_design_scores_gemma":[0.00013498942,0.0014456144,0.07748038,0.003218209,0.00038162852,0.002010719,0.052786246,0.014922636,0.009404783,0.14206867,0.6958071,0.00033898168],"about_ca_topic_score_codex":0.008760952,"about_ca_topic_score_gemma":0.01107143,"teacher_disagreement_score":0.022141343,"about_ca_system_score_codex":0.0070135426,"about_ca_system_score_gemma":0.024369843,"threshold_uncertainty_score":0.11709601},"labels":[],"label_agreement":null},{"id":"W4386309263","doi":"10.1002/iis2.13007","title":"Understanding Interface Criticality in Large Infrastructure Projects","year":2023,"lang":"en","type":"article","venue":"INCOSE International Symposium","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WSP (Canada)","funders":"","keywords":"Interface (matter); Criticality; Key (lock); Computer science; Failure mode, effects, and criticality analysis; Critical infrastructure; Process management; Risk analysis (engineering); Business; Computer security","score_opus":0.1723555537947321,"score_gpt":0.40920870111657465,"score_spread":0.23685314732184254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386309263","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.963824,0.0005165759,0.018634701,0.0008431804,0.00001248532,0.00016208636,0.0000542589,0.000049987164,0.015902715],"genre_scores_gemma":[0.99631435,0.00017633592,0.00316417,0.00001665405,0.0000050547906,0.000032223048,0.000020974696,0.0000070366937,0.00026323184],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9890977,0.0059628915,0.00073802465,0.0005446606,0.0026720832,0.0009846239],"domain_scores_gemma":[0.89928436,0.066268854,0.016884482,0.0017176337,0.013545547,0.002299165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015479052,0.0005813905,0.00040699268,0.008537268,0.0016866022,0.0072055846,0.0009802431,0.0011130356,0.0021009704],"category_scores_gemma":[0.06101124,0.00056199596,0.00029722447,0.0036756948,0.0034615872,0.0075380816,0.004112952,0.0016847204,0.00019928989],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007359093,0.0006649081,0.46412808,0.0009951983,0.00020508736,0.002895445,0.12171398,0.06176154,0.008453548,0.07370502,0.0027099806,0.26203135],"study_design_scores_gemma":[0.000043955853,0.0009918163,0.47940052,0.0017116829,0.0001258579,0.0012924125,0.2645982,0.13605797,0.0064980825,0.087036856,0.022006616,0.00023604996],"about_ca_topic_score_codex":0.012822397,"about_ca_topic_score_gemma":0.010182025,"teacher_disagreement_score":0.015479052,"about_ca_system_score_codex":0.0061764596,"about_ca_system_score_gemma":0.0035489579,"threshold_uncertainty_score":0.08186203},"labels":[],"label_agreement":null},{"id":"W4386314319","doi":"10.5430/ijba.v14n3p17","title":"Investigating Employee Engagement of Engineering Teams of Long-term Domestic Projects: Multinational Organizations Under Hybrid-working Model in Egypt","year":2023,"lang":"en","type":"article","venue":"International Journal of Business Administration","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Coaching; Employee engagement; Multinational corporation; Work engagement; Human resource management; Knowledge management; Job attitude; Psychology; Term (time); Business; Job performance; Marketing; Computer science; Social psychology; Management; Job satisfaction; Work (physics); Economics; Engineering","score_opus":0.09684314961306212,"score_gpt":0.3761449295991852,"score_spread":0.2793017799861231,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386314319","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9998017,0.0000101043115,0.000027112612,0.000018404664,4.4930306e-7,0.000002325271,0.0000034015802,1.8813448e-7,0.000136364],"genre_scores_gemma":[0.9996942,0.000021404303,0.00003490132,0.0000101702,7.1017485e-7,0.0000063006237,0.000009260249,3.501557e-7,0.00022259001],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99887365,0.00047440967,0.000051018196,0.00010143403,0.00014462814,0.0003548613],"domain_scores_gemma":[0.998256,0.00044417792,0.0004887891,0.00008167863,0.00022111923,0.0005082724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016792726,0.00021451904,0.00021425066,0.0005833174,0.001382767,0.0015439248,0.00043796853,0.00045703116,0.0014194564],"category_scores_gemma":[0.0021872043,0.00017293148,0.00022394974,0.00056145736,0.0006754298,0.00067856774,0.0018994695,0.00053858437,0.00015088358],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014649972,0.00069259433,0.9055142,0.00005876523,0.000038786733,0.0004498126,0.07416573,0.00028297977,0.0010541966,0.00032091842,0.00020365283,0.017071912],"study_design_scores_gemma":[0.0000060573134,0.00028177912,0.7614705,0.000037319183,0.000014781188,0.00009559352,0.23629048,0.0005500592,0.00021446704,0.00011420128,0.0009133658,0.000011455321],"about_ca_topic_score_codex":0.008014545,"about_ca_topic_score_gemma":0.018099928,"teacher_disagreement_score":0.008014545,"about_ca_system_score_codex":0.0014755228,"about_ca_system_score_gemma":0.0013200577,"threshold_uncertainty_score":0.015935838},"labels":[],"label_agreement":null},{"id":"W4386689328","doi":"10.1007/s10479-023-05564-3","title":"The use of multi-criteria decision-making methods in project portfolio selection: a literature review and future research directions","year":2023,"lang":"en","type":"review","venue":"Annals of Operations Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":55,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Selection (genetic algorithm); Portfolio; Management science; Computer science; Project portfolio management; Operations research; Engineering; Artificial intelligence; Systems engineering; Business; Project management; Finance","score_opus":0.8088985225331905,"score_gpt":0.7092712999237242,"score_spread":0.09962722260946633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386689328","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0002462908,0.99782085,0.0011307107,0.00031135583,0.000087689135,0.000014976397,0.000016722744,0.0000028663096,0.00036848997],"genre_scores_gemma":[0.004079091,0.99185574,0.003616907,0.00019424294,0.00013798117,0.000027592787,0.000021209818,0.0000024589967,0.000064808955],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.99308974,0.0029105789,0.0011512325,0.00064757385,0.0020606485,0.0001402804],"domain_scores_gemma":[0.9480549,0.0447123,0.0024725024,0.00045001513,0.0040747416,0.00023556416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016837912,0.0015283397,0.004744808,0.009432074,0.00053149473,0.004651751,0.002196811,0.00196667,0.003135226],"category_scores_gemma":[0.02651302,0.0007030898,0.002658823,0.017438905,0.0011292875,0.003661436,0.0013376698,0.0021213475,0.00043272533],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008226882,0.00013053285,0.0009781322,0.08741519,0.0010751004,0.00008237756,0.00013634932,0.0013721394,0.0002651305,0.0050995187,0.0026248898,0.9007383],"study_design_scores_gemma":[0.0002856816,0.0012941094,0.022433443,0.388396,0.013701409,0.0028473248,0.0022015779,0.012538146,0.002180217,0.043641493,0.50983,0.00065058324],"about_ca_topic_score_codex":0.0030873662,"about_ca_topic_score_gemma":0.0066785375,"teacher_disagreement_score":0.016837912,"about_ca_system_score_codex":0.001780232,"about_ca_system_score_gemma":0.0046787593,"threshold_uncertainty_score":0.089048445},"labels":[],"label_agreement":null},{"id":"W4386713938","doi":"10.1007/978-3-031-43666-6_44","title":"A Conceptual Framework for Applying Artificial Intelligence to Manufacturing Projects","year":2023,"lang":"en","type":"book-chapter","venue":"IFIP advances in information and communication technology","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Software deployment; Workflow; Engineering; Knowledge management; Process management; Management science; Engineering management; Manufacturing engineering; Computer science; Systems engineering; Software engineering","score_opus":0.11311840436449555,"score_gpt":0.38379125957992694,"score_spread":0.2706728552154314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386713938","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0057906173,0.0042532966,0.7159245,0.012633882,0.00043348837,0.00026021746,0.00035920527,0.0003220486,0.2600227],"genre_scores_gemma":[0.29867873,0.0044952566,0.66549957,0.0016626437,0.0004788462,0.0012719522,0.0006624053,0.00015126278,0.02709934],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9981092,0.0009913626,0.00017372305,0.0002351928,0.00034080207,0.0001497412],"domain_scores_gemma":[0.9979819,0.0012117277,0.00017384523,0.00018470465,0.00028448107,0.00016335516],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032576618,0.0010831485,0.0006821397,0.0046491968,0.0028790203,0.010111642,0.004069065,0.003183464,0.009890548],"category_scores_gemma":[0.0041496097,0.0007479399,0.0015425215,0.005686174,0.014647335,0.010960864,0.0028712268,0.0035493472,0.0013982833],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.977703e-7,0.0000045446104,0.000026194763,0.000016305496,0.0000025705472,0.00002189364,0.00019662791,0.0006977826,0.000025337482,0.9966397,0.0004939976,0.0018740873],"study_design_scores_gemma":[0.0000059028353,0.0000064414767,0.00006480286,0.00006137892,0.000005671387,0.000041454092,0.00042355055,0.004670425,0.00005734495,0.96470946,0.029944936,0.0000087030085],"about_ca_topic_score_codex":0.013639055,"about_ca_topic_score_gemma":0.010246702,"teacher_disagreement_score":0.013639055,"about_ca_system_score_codex":0.0055078403,"about_ca_system_score_gemma":0.004496136,"threshold_uncertainty_score":0.03996235},"labels":[],"label_agreement":null},{"id":"W4386911829","doi":"10.3390/bs13090786","title":"Comparing Single-Item and Multi-Item Trust Scales: Insights for Assessing Trust in Project Leaders","year":2023,"lang":"en","type":"article","venue":"Behavioral Sciences","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Psychology; Scale (ratio); Data science; Computer science; Geography; Cartography","score_opus":0.5778981361526058,"score_gpt":0.49535856148421276,"score_spread":0.08253957466839301,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386911829","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8723552,0.0016047681,0.11509642,0.00070517877,0.0001807479,0.0011092527,0.00027633982,0.0001334546,0.008538679],"genre_scores_gemma":[0.96226424,0.00028049064,0.036515206,0.000053026197,0.000019379895,0.000577514,0.00009975359,0.000015995605,0.00017436619],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9601612,0.028291581,0.0042381077,0.0010951563,0.0056192493,0.00059456815],"domain_scores_gemma":[0.8836936,0.08358244,0.01422373,0.0045914454,0.012076008,0.0018327858],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.04016694,0.00051392685,0.0008275116,0.0048686136,0.0010383698,0.0033363837,0.0006812451,0.0006970954,0.0013407251],"category_scores_gemma":[0.12879117,0.000453,0.0015753582,0.0041994294,0.0011939,0.0051840195,0.0028527784,0.001039943,0.00022254193],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00073441427,0.00063508446,0.58144045,0.0021589813,0.001112492,0.00033701045,0.04983873,0.0027637018,0.0036207084,0.0108723985,0.0014757331,0.3450102],"study_design_scores_gemma":[0.00026743242,0.0051570586,0.77917296,0.0031319181,0.001206837,0.0013610122,0.09285065,0.05938232,0.00616204,0.039139435,0.011678195,0.0004901154],"about_ca_topic_score_codex":0.0013506371,"about_ca_topic_score_gemma":0.002931627,"teacher_disagreement_score":0.04016694,"about_ca_system_score_codex":0.0012833972,"about_ca_system_score_gemma":0.0019292294,"threshold_uncertainty_score":0.21242565},"labels":[],"label_agreement":null},{"id":"W4387261133","doi":"10.36487/acg_repo/2315_015","title":"New opportunities for collaborative closure planning in Canadian regulatory frameworks","year":2023,"lang":"en","type":"article","venue":"Mine closure","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Inro Consultants (Canada)","funders":"","keywords":"Closure (psychology); Computer science; Process management; Business; Knowledge management; Political science","score_opus":0.1643277353357408,"score_gpt":0.37495499770711765,"score_spread":0.21062726237137686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387261133","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015850449,0.086492926,0.06253097,0.1160547,0.0031229605,0.00088630326,0.0005285519,0.0004086175,0.7141245],"genre_scores_gemma":[0.6797636,0.10004285,0.09165173,0.023793552,0.0012804815,0.0011356923,0.00069064763,0.00048731893,0.101154126],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9574681,0.008570051,0.0017203165,0.0034903334,0.021877665,0.0068735527],"domain_scores_gemma":[0.9665896,0.011853998,0.001465249,0.0021466056,0.014964522,0.002979934],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03663687,0.0011404532,0.00081935135,0.0070692655,0.018686907,0.022835534,0.0073305396,0.0072793537,0.011651259],"category_scores_gemma":[0.036980968,0.0010167753,0.0019007726,0.006504781,0.025065958,0.007342718,0.00925223,0.00793272,0.0007091431],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":true,"study_design_scores_codex":[0.000014527911,0.000026691883,0.0007004527,0.00078985613,0.000027669064,0.00039961704,0.008766998,0.0034066215,0.00025979683,0.897578,0.028565733,0.059464004],"study_design_scores_gemma":[0.000021175187,0.000023956583,0.0018806643,0.0016828787,0.0000421511,0.00016670671,0.006056616,0.001576428,0.00031473266,0.057341147,0.93076617,0.00012732064],"about_ca_topic_score_codex":0.9552887,"about_ca_topic_score_gemma":0.97139186,"teacher_disagreement_score":0.828396,"about_ca_system_score_codex":0.17160398,"about_ca_system_score_gemma":0.33965555,"threshold_uncertainty_score":0.960822},"labels":[],"label_agreement":null},{"id":"W4387345812","doi":"10.20944/preprints202310.0201.v1","title":"LPS Framework to Assess Planning Reliability in Architectural Design","year":2023,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; American University of Beirut","keywords":"Planner; Reliability (semiconductor); Architectural design; Computer science; Key (lock); Conceptual design; Systems engineering; Process (computing); Benchmark (surveying); Design process; Process management; Architectural engineering; Engineering; Architecture; Work in process; Human–computer interaction; Operations management; Computer security","score_opus":0.6452443507322019,"score_gpt":0.5116241543548222,"score_spread":0.13362019637737965,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387345812","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010530294,0.0002966572,0.97868437,0.00029103702,0.000027079852,0.00023598089,0.00044514373,0.0010185944,0.008470916],"genre_scores_gemma":[0.30051273,0.00038273583,0.69478726,0.00009654879,0.000048659957,0.00084022636,0.0009529411,0.00025400615,0.0021249277],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9921129,0.004448366,0.00052173453,0.0005067489,0.002083198,0.000327167],"domain_scores_gemma":[0.9864031,0.0073375036,0.0021864478,0.0014006296,0.002336437,0.0003357863],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00714071,0.0015734454,0.0005924671,0.005871219,0.00058135286,0.0026959751,0.0016084189,0.0009987626,0.0052021844],"category_scores_gemma":[0.023255005,0.0006533213,0.001085738,0.0026032387,0.0019764137,0.0028651198,0.0029359455,0.0014832534,0.001138643],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009652289,0.0001347112,0.006859116,0.0005971645,0.00009984704,0.00011580813,0.0007575919,0.63362634,0.0029331862,0.22877613,0.0038622988,0.12214127],"study_design_scores_gemma":[0.000022471715,0.00023466631,0.002908526,0.00018257435,0.000045418146,0.00009238681,0.00040605676,0.85900813,0.0021555624,0.120090336,0.014800588,0.000053211214],"about_ca_topic_score_codex":0.006942414,"about_ca_topic_score_gemma":0.006281241,"teacher_disagreement_score":0.00714071,"about_ca_system_score_codex":0.0024542501,"about_ca_system_score_gemma":0.0034945037,"threshold_uncertainty_score":0.037764132},"labels":[],"label_agreement":null},{"id":"W4387408358","doi":"10.3917/resg.157.0357","title":"La projectification dans les organisations culturelles : le cas d’une exposition temporaire","year":2023,"lang":"fr","type":"article","venue":"Recherches en Sciences de Gestion","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Saint-Boniface","funders":"","keywords":"Political science; Humanities; Art","score_opus":0.3346430962739723,"score_gpt":0.4559187442043271,"score_spread":0.12127564793035478,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387408358","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7623397,0.0016497743,0.14233705,0.0039842366,0.00018152875,0.0002480054,0.00020174585,0.0003728963,0.08868498],"genre_scores_gemma":[0.95874125,0.0007540169,0.026346933,0.00023318625,0.00003650225,0.0003448992,0.000100020414,0.00016854357,0.013274749],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9860006,0.008008161,0.0004740445,0.0014263617,0.0033440702,0.0007468346],"domain_scores_gemma":[0.9682685,0.019620894,0.002677377,0.0044242153,0.0040772404,0.00093187636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009931003,0.0007026008,0.00036380018,0.0015881291,0.0032931515,0.009648695,0.0011427804,0.0021737898,0.006964887],"category_scores_gemma":[0.026509726,0.0006455108,0.0006149453,0.0020337706,0.00713404,0.0071740216,0.0054845726,0.0023536314,0.001134484],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00055526086,0.0004252358,0.031983476,0.0015189466,0.000120915756,0.002359131,0.48538366,0.0095899915,0.02821337,0.18703085,0.0045506037,0.24826859],"study_design_scores_gemma":[0.00009981692,0.0016889499,0.08057814,0.0023277886,0.00014202548,0.003837637,0.3644366,0.017278204,0.02338024,0.11881687,0.38699225,0.00042150205],"about_ca_topic_score_codex":0.0060680504,"about_ca_topic_score_gemma":0.0042286087,"teacher_disagreement_score":0.009931003,"about_ca_system_score_codex":0.003054083,"about_ca_system_score_gemma":0.0034323155,"threshold_uncertainty_score":0.052520752},"labels":[],"label_agreement":null},{"id":"W4387452690","doi":"10.1061/jcemd4.coeng-13672","title":"Fuzzy Agent–Based Modeling of Competency and Performance Measures in Construction","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Fuzzy logic; Computer science; Artificial intelligence","score_opus":0.04613004933097436,"score_gpt":0.2791773188368558,"score_spread":0.23304726950588145,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387452690","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17560934,0.00045224355,0.79409724,0.0008950013,0.000061856495,0.00018132567,0.00029291675,0.00017469145,0.028235385],"genre_scores_gemma":[0.94113475,0.0002631575,0.053037748,0.00004237348,0.000015191011,0.00019873188,0.000112274414,0.000011749522,0.0051840036],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995902,0.00016397395,0.000019963145,0.00007065943,0.00009947201,0.000055602726],"domain_scores_gemma":[0.99936587,0.000350612,0.000104280945,0.000020618629,0.00011380073,0.000044909953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00091969303,0.0006253199,0.00048672422,0.00068809895,0.0006020281,0.0014592863,0.0012377299,0.0011070769,0.0018649483],"category_scores_gemma":[0.0018383879,0.00032302787,0.0006010861,0.00064318767,0.0006616363,0.0010038457,0.0007228808,0.0007915213,0.0001617909],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018747418,0.000028461378,0.00097072776,0.0000144444475,0.000015602598,0.000058838294,0.00008216533,0.97780186,0.0003734994,0.017324768,0.00016224005,0.0031485853],"study_design_scores_gemma":[0.0000028667228,0.0000065455874,0.00013556377,0.0000027551841,0.0000028725137,0.0000037532623,0.000011991898,0.99801695,0.00004661201,0.0015997152,0.00016752254,0.0000028789614],"about_ca_topic_score_codex":0.028740635,"about_ca_topic_score_gemma":0.018021017,"teacher_disagreement_score":0.028740635,"about_ca_system_score_codex":0.0020300257,"about_ca_system_score_gemma":0.0014554156,"threshold_uncertainty_score":0.057146728},"labels":[],"label_agreement":null},{"id":"W4387460308","doi":"10.5772/intechopen.112002","title":"Risk Factors Affecting Public Infrastructure Projects","year":2023,"lang":"en","type":"book-chapter","venue":"Civil engineering.","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute on Governance","funders":"","keywords":"Business; Underpinning; Government (linguistics); Nonprobability sampling; Service delivery framework; Public infrastructure; Public work; Integrated project delivery; Environmental planning; Service (business); Operations management; Public relations; Environmental health; Engineering; Marketing; Geography; Political science; Public administration; Construction management; Civil engineering; Medicine","score_opus":0.061410864366172324,"score_gpt":0.2766964147708408,"score_spread":0.21528555040466846,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387460308","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93140376,0.0036733258,0.0038260396,0.00720976,0.000075910204,0.00029594018,0.000114023096,0.000045226276,0.053356007],"genre_scores_gemma":[0.99297523,0.0028359995,0.0011193258,0.00010131344,0.000028093806,0.000069693095,0.000036148165,0.000008715214,0.0028255451],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9961675,0.0017229612,0.00023025829,0.00016563068,0.0012061347,0.0005074248],"domain_scores_gemma":[0.98782235,0.005736355,0.004144815,0.00022176371,0.0009884813,0.0010862858],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026236312,0.00040367353,0.00018436342,0.0014790489,0.0025829636,0.002677893,0.00066402665,0.00082220533,0.0037786898],"category_scores_gemma":[0.01653814,0.00027682984,0.0002411254,0.0020855563,0.0019121142,0.0016985494,0.0031060511,0.0010207439,0.00033598024],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016407651,0.0005951291,0.41035864,0.0018984444,0.00006633758,0.010892896,0.26123354,0.004609759,0.002899215,0.043675456,0.0119603975,0.25164616],"study_design_scores_gemma":[0.000017863576,0.00037817695,0.36580428,0.0037840423,0.000074636424,0.007471748,0.47431043,0.0026753212,0.0014750338,0.01618225,0.12764871,0.00017748834],"about_ca_topic_score_codex":0.008628163,"about_ca_topic_score_gemma":0.008849785,"teacher_disagreement_score":0.008628163,"about_ca_system_score_codex":0.0028600376,"about_ca_system_score_gemma":0.0048214844,"threshold_uncertainty_score":0.020751119},"labels":[],"label_agreement":null},{"id":"W4387477051","doi":"10.1080/09537287.2023.2257178","title":"Fast-and-frugal heuristics: an exploration into building an adaptive toolbox to assess the uncertainty of rework","year":2023,"lang":"en","type":"article","venue":"Production Planning & Control","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Curtin University of Technology; Deakin University; Australian Research Council; Curtin University, Malaysia","keywords":"Rework; Toolbox; Heuristics; Computer science; Probabilistic logic; Risk analysis (engineering); Management science; Artificial intelligence; Economics; Business","score_opus":0.22768773505918108,"score_gpt":0.4229694925386791,"score_spread":0.19528175747949802,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387477051","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24650615,0.0006958523,0.713165,0.0032628954,0.000059591363,0.00038613196,0.000131738,0.0004594767,0.035333183],"genre_scores_gemma":[0.88215065,0.00017127537,0.11670007,0.00015639138,0.00001165837,0.00010970627,0.000047226848,0.00004145619,0.0006115118],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.985013,0.009887794,0.0005731912,0.0018824344,0.0018580051,0.0007856896],"domain_scores_gemma":[0.9423149,0.03977289,0.0063648447,0.006697739,0.003248838,0.0016006537],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022619864,0.0011189326,0.0010664819,0.0032726543,0.001543395,0.009547645,0.0029915841,0.00205121,0.0031113252],"category_scores_gemma":[0.08001736,0.0007497954,0.0013619803,0.0016439564,0.015333825,0.009159426,0.0044531,0.0024879575,0.0003332613],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040756745,0.00035763741,0.045859016,0.0005971005,0.00045744271,0.0006534498,0.041081235,0.11308719,0.0036228457,0.6041093,0.0017759254,0.18799126],"study_design_scores_gemma":[0.000053586784,0.00033341846,0.013989485,0.0003961404,0.00009506554,0.00032934846,0.010341971,0.16851968,0.0019078214,0.79571116,0.008063753,0.00025865017],"about_ca_topic_score_codex":0.0069344467,"about_ca_topic_score_gemma":0.005570284,"teacher_disagreement_score":0.022619864,"about_ca_system_score_codex":0.0041111377,"about_ca_system_score_gemma":0.0041586286,"threshold_uncertainty_score":0.1196267},"labels":[],"label_agreement":null},{"id":"W4387937977","doi":"10.3390/buildings13112684","title":"Last Planner System Framework to Assess Planning Reliability in Architectural Design","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Planner; Reliability (semiconductor); Systems engineering; Conceptual design; Architectural design; Key (lock); Benchmark (surveying); Process (computing); Computer science; Engineering; Design process; Architectural plan; Architectural engineering; Process management; Software engineering; Architecture; Work in process; Human–computer interaction; Operations management; Computer security","score_opus":0.21387849297092643,"score_gpt":0.4151234404243287,"score_spread":0.20124494745340227,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387937977","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021720154,0.00037718884,0.9302766,0.0005019554,0.00007312485,0.0013121178,0.0054476247,0.015364838,0.024926443],"genre_scores_gemma":[0.18333426,0.00027887832,0.80475676,0.00010915472,0.000028833063,0.0019210203,0.0050930693,0.0009136741,0.0035644018],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9939614,0.0030397086,0.00054879783,0.00045021597,0.0017668053,0.00023297544],"domain_scores_gemma":[0.9890782,0.004928062,0.0017578251,0.0015047455,0.002435407,0.0002956668],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0069946223,0.0014357681,0.00063546974,0.005422107,0.00069433125,0.0033679074,0.0017534549,0.00094385614,0.012072589],"category_scores_gemma":[0.022338497,0.0007347686,0.0012371064,0.0024135732,0.0009251125,0.0026524793,0.0028298846,0.0014100382,0.0022746993],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036976082,0.0005053274,0.027914086,0.0020342898,0.00032538272,0.0003063046,0.0030200693,0.3848634,0.0064153676,0.21768486,0.03793668,0.31862456],"study_design_scores_gemma":[0.00010487776,0.0005468388,0.01307397,0.0006112903,0.00012391787,0.00021879989,0.0012255801,0.79219,0.0064267763,0.073072724,0.11222207,0.00018323777],"about_ca_topic_score_codex":0.014169488,"about_ca_topic_score_gemma":0.020949462,"teacher_disagreement_score":0.014169488,"about_ca_system_score_codex":0.0027159438,"about_ca_system_score_gemma":0.0043297606,"threshold_uncertainty_score":0.040386856},"labels":[],"label_agreement":null},{"id":"W4388266160","doi":"10.1016/j.inffus.2023.102096","title":"Dynamic collective opinion generation framework for digital transformation barrier analysis in the construction industry","year":2023,"lang":"en","type":"article","venue":"Information Fusion","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":32,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"National Natural Science Foundation of China","keywords":"Betweenness centrality; Centrality; Computer science; Context (archaeology); Node (physics); Transformation (genetics); Function (biology); Closeness; Data mining; Data science; Operations research; Industrial engineering; Engineering; Mathematics","score_opus":0.06387095180767308,"score_gpt":0.3637241671960612,"score_spread":0.29985321538838816,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388266160","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.066715084,0.0002197629,0.9185779,0.001311912,0.000067257926,0.00007752562,0.00015095212,0.00009500567,0.0127845155],"genre_scores_gemma":[0.9567255,0.00012641752,0.040128212,0.00010492551,0.000066576766,0.00016021462,0.00011999463,0.000028696584,0.0025394326],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99832517,0.0010566524,0.00004146164,0.00018613992,0.00020297422,0.00018754975],"domain_scores_gemma":[0.99546814,0.003394709,0.00032827942,0.00024675173,0.00040805407,0.00015407937],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004782881,0.0003718476,0.00078014587,0.0013609604,0.00096416264,0.0021971506,0.0015958864,0.0011705719,0.0051600346],"category_scores_gemma":[0.009839718,0.00022069368,0.0009992864,0.0010549794,0.001455002,0.0027980516,0.0018130773,0.0011465488,0.00036878858],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007688581,0.0000725664,0.0016593173,0.000074989235,0.000095161755,0.000152411,0.00078645325,0.1595371,0.0008584797,0.8087204,0.0022809785,0.025685262],"study_design_scores_gemma":[0.000009545508,0.000018517585,0.00043116166,0.000011353628,0.000014745664,0.000016553655,0.00022862949,0.7913155,0.00009680042,0.20710064,0.0007438035,0.000012686341],"about_ca_topic_score_codex":0.0034413924,"about_ca_topic_score_gemma":0.0024234015,"teacher_disagreement_score":0.0051600346,"about_ca_system_score_codex":0.0014608693,"about_ca_system_score_gemma":0.0010080693,"threshold_uncertainty_score":0.025294602},"labels":[],"label_agreement":null},{"id":"W4388417215","doi":"10.3390/su152115637","title":"Unearthing the Construction Industry’s Awareness of and Reactions to the Global Sand Crisis","year":2023,"lang":"en","type":"article","venue":"Sustainability","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Surprise; Denial; Curiosity; Public relations; Crisis management; Crisis communication; Resource (disambiguation); Psychology; Business; Marketing; Political science; Social psychology; Management; Economics; Computer science","score_opus":0.06732038982492945,"score_gpt":0.40604739788295097,"score_spread":0.33872700805802153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388417215","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99560636,0.00008381166,0.000185022,0.0008063637,0.000003875678,0.000006432259,0.0000069782363,0.000002360296,0.0032987858],"genre_scores_gemma":[0.9992735,0.00014380508,0.00009079123,0.0001071846,0.0000027472245,0.000003034229,0.000008745596,0.0000010972012,0.00036905092],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99678385,0.0013518372,0.00016065524,0.00013867441,0.001060626,0.000504386],"domain_scores_gemma":[0.9838336,0.008068507,0.0037119447,0.000421189,0.0028238436,0.0011409201],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00418892,0.00012979867,0.00014078009,0.0012456451,0.0014908349,0.0028307755,0.00037435963,0.00088398746,0.0013531813],"category_scores_gemma":[0.018033555,0.00024369829,0.00011920122,0.00079044123,0.0022613283,0.0012486218,0.0019486313,0.0009672915,0.00017260613],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012565711,0.00011908849,0.5331009,0.00020868634,0.00003379326,0.0007135,0.40718102,0.00045262687,0.0037332017,0.0012145492,0.0016447892,0.051472098],"study_design_scores_gemma":[0.0000046244704,0.00012422829,0.26486725,0.00013135532,0.000015026987,0.0002834543,0.723458,0.0005445446,0.0007951399,0.00056246744,0.0091783395,0.000035608875],"about_ca_topic_score_codex":0.0296576,"about_ca_topic_score_gemma":0.044552717,"teacher_disagreement_score":0.0296576,"about_ca_system_score_codex":0.0024374654,"about_ca_system_score_gemma":0.0043442356,"threshold_uncertainty_score":0.058969975},"labels":[],"label_agreement":null},{"id":"W4388459140","doi":"10.1177/87569728231208853","title":"Interorganizational Design for Collaborative Governance in Co-Owned Major Projects: An Engaged Scholarship Approach","year":2023,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Sensemaking; Scholarship; Collaborative governance; Corporate governance; Project governance; Knowledge management; Business; Work (physics); Process management; Political science; Public relations; Engineering; Computer science","score_opus":0.24519868088507427,"score_gpt":0.4047512774854951,"score_spread":0.15955259660042084,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388459140","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08108043,0.0008463613,0.8111641,0.010395371,0.00017546608,0.00056075084,0.000036479825,0.00013571866,0.09560533],"genre_scores_gemma":[0.8541208,0.0005400912,0.13847548,0.00022868441,0.00006383868,0.0007729845,0.000030830117,0.000042727683,0.005724547],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9793866,0.01746738,0.00043359122,0.00086781115,0.0013139021,0.0005306564],"domain_scores_gemma":[0.9849284,0.009390327,0.0008831349,0.00295358,0.00092379213,0.0009206137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019080365,0.0004553456,0.0004928236,0.002311557,0.004269298,0.01166256,0.0027270294,0.0025989383,0.003755296],"category_scores_gemma":[0.01457401,0.0004280099,0.0007683369,0.0016961811,0.02235379,0.0086599365,0.0093564205,0.002651169,0.000360356],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012552055,0.00009811205,0.0010282423,0.00011599263,0.000013545732,0.00015980825,0.016706923,0.0028702228,0.00039387486,0.96027315,0.00041793566,0.017909689],"study_design_scores_gemma":[0.000050618426,0.00017426298,0.0008721799,0.00024966948,0.000024843024,0.00019750181,0.028517202,0.01642363,0.00068758155,0.90218616,0.050589968,0.000026462343],"about_ca_topic_score_codex":0.001039165,"about_ca_topic_score_gemma":0.0023505914,"teacher_disagreement_score":0.019080365,"about_ca_system_score_codex":0.0060954792,"about_ca_system_score_gemma":0.008488601,"threshold_uncertainty_score":0.10090786},"labels":[],"label_agreement":null},{"id":"W4388745691","doi":"10.32388/4odpty","title":"Review of: \"Business projects need to be handled differently from construction projects\"","year":2023,"lang":"en","type":"peer-review","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Business; Engineering management; Construction engineering; Engineering; Process management","score_opus":0.21015763053701314,"score_gpt":0.3968910077773463,"score_spread":0.18673337724033318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388745691","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0021733383,0.011239275,0.0041835704,0.5063999,0.42604643,0.0022699109,0.002688146,0.000986859,0.04401251],"genre_scores_gemma":[0.020763706,0.031223703,0.009689235,0.25599313,0.28335553,0.002753367,0.008827338,0.0016498355,0.38574418],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.96199876,0.0074916636,0.004273171,0.0016443296,0.023242904,0.0013490731],"domain_scores_gemma":[0.59179425,0.052402165,0.007625277,0.008809419,0.32902038,0.010348532],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.040484726,0.0012431731,0.0027859134,0.005690918,0.0058192783,0.009271735,0.0049140975,0.015199316,0.035723258],"category_scores_gemma":[0.16273874,0.0009469444,0.0015666806,0.0037591371,0.0038073054,0.004760248,0.0043323366,0.0072197607,0.027541298],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033106888,0.000016019141,0.000102860926,0.0004054668,0.00001023618,0.00003761992,0.00008876896,0.00002323459,0.0001859167,0.000711948,0.98586637,0.012518466],"study_design_scores_gemma":[0.0000426911,0.00004193879,0.002314585,0.0008511144,0.00004270914,0.00006714626,0.00023340348,0.00025960355,0.00044254662,0.0014266539,0.9942427,0.000034854198],"about_ca_topic_score_codex":0.014391355,"about_ca_topic_score_gemma":0.029966982,"teacher_disagreement_score":0.040484726,"about_ca_system_score_codex":0.0057467693,"about_ca_system_score_gemma":0.04829358,"threshold_uncertainty_score":0.21410626},"labels":[],"label_agreement":null},{"id":"W4388759340","doi":"10.1080/17452007.2023.2283761","title":"Demystifying the dynamic link between project value and design team networks: A socio-technical lean management framework","year":2023,"lang":"en","type":"article","venue":"Architectural Engineering and Design Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Knowledge management; Sociotechnical system; Project management; Context (archaeology); Value (mathematics); Project team; Project stakeholder; Process management; Computer science; Engineering; Project management triangle; Project charter; Systems engineering","score_opus":0.061766915942966884,"score_gpt":0.32352528546422943,"score_spread":0.2617583695212625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388759340","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0723618,0.0009367982,0.86372805,0.015426556,0.00013522069,0.00046910447,0.00017335381,0.00026354086,0.04650553],"genre_scores_gemma":[0.58904475,0.0007157913,0.406999,0.0002584053,0.00005755487,0.00043907136,0.00014139518,0.000069741225,0.0022742746],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9901314,0.0066627986,0.0004222763,0.0008176696,0.0014360639,0.0005297155],"domain_scores_gemma":[0.9803782,0.012134476,0.0026686317,0.0015475294,0.0021993818,0.0010717531],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016328566,0.0012443621,0.00039612633,0.01061063,0.0042351494,0.01289441,0.0028784494,0.0020296392,0.0015765828],"category_scores_gemma":[0.01673407,0.00076095475,0.00074787653,0.005238079,0.018921027,0.01296698,0.0074746707,0.0026939064,0.00026545874],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023139573,0.00013774926,0.006953382,0.00027171415,0.00004494309,0.00044162315,0.028828256,0.011199604,0.0011068681,0.88898957,0.0012184221,0.06078471],"study_design_scores_gemma":[0.000017314354,0.000078377365,0.00466583,0.00073805434,0.00006218731,0.00027365706,0.039266575,0.07151507,0.0014490711,0.83452743,0.04732753,0.00007891055],"about_ca_topic_score_codex":0.0072901235,"about_ca_topic_score_gemma":0.01083154,"teacher_disagreement_score":0.016328566,"about_ca_system_score_codex":0.0085079605,"about_ca_system_score_gemma":0.01064491,"threshold_uncertainty_score":0.08635467},"labels":[],"label_agreement":null},{"id":"W4388952114","doi":"10.1504/ijpom.2023.134967","title":"Ongoing performance, resource slack and risk perceptions in projects","year":2023,"lang":"en","type":"article","venue":"International Journal of Project Organisation and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Business; Perception; Project management; Project manager; Resource (disambiguation); Project risk management; Operations management; Knowledge management; Project management triangle; Management; Computer science; Economics; Psychology","score_opus":0.058941038646038245,"score_gpt":0.3562496783576043,"score_spread":0.29730863971156607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388952114","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99897647,0.000050155857,0.00029469744,0.00005647667,0.0000018321789,0.000005586388,0.0000040205905,0.000001169047,0.00060970965],"genre_scores_gemma":[0.9996995,0.000032159576,0.00011695798,0.000007108748,0.0000032496412,0.000005767528,0.0000069390035,0.0000010129979,0.00012738795],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99583435,0.0019688578,0.00034380317,0.00018331133,0.0012675265,0.00040218094],"domain_scores_gemma":[0.95594734,0.02020521,0.015418033,0.0008979513,0.0020815497,0.0054499507],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006296757,0.00026492475,0.00021336814,0.0012264234,0.00072190224,0.0021856097,0.00029572894,0.00049457117,0.0013515507],"category_scores_gemma":[0.03895469,0.00023439222,0.00033224424,0.0006871216,0.0016591438,0.001589984,0.0022781119,0.0010313935,0.00014216128],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002952138,0.00070153165,0.9464323,0.00005425715,0.0000764899,0.00017004531,0.02017956,0.0022546141,0.0013486219,0.0016098147,0.00016882633,0.026708683],"study_design_scores_gemma":[0.0000148825675,0.00089298305,0.9689849,0.0000604975,0.000023796,0.00021533958,0.02245723,0.003177197,0.00036600782,0.0028052302,0.0009445661,0.00005735539],"about_ca_topic_score_codex":0.0013895524,"about_ca_topic_score_gemma":0.001636416,"teacher_disagreement_score":0.006296757,"about_ca_system_score_codex":0.0007062935,"about_ca_system_score_gemma":0.0007414201,"threshold_uncertainty_score":0.033300817},"labels":[],"label_agreement":null},{"id":"W4388991118","doi":"10.1111/emre.12620","title":"Project legitimacy: Towards a theoretical framework","year":2023,"lang":"en","type":"article","venue":"European Management Review","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal; Université de Sherbrooke","funders":"","keywords":"Legitimacy; Legitimation; Mainstream; Argument (complex analysis); Public relations; Political science; Sociology; Law","score_opus":0.1401185587700727,"score_gpt":0.43594830304311966,"score_spread":0.295829744273047,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388991118","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.059461866,0.024153437,0.43551356,0.11899552,0.0010098714,0.0004854264,0.0002583034,0.00022573539,0.3598963],"genre_scores_gemma":[0.9521865,0.005604677,0.03725153,0.0014037351,0.0006050725,0.0004596687,0.0001070531,0.00004120736,0.0023404958],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97985244,0.013147158,0.00085147074,0.0014613442,0.0037962918,0.0008912638],"domain_scores_gemma":[0.93818146,0.047296733,0.0047474485,0.0026665742,0.0053091124,0.0017986026],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.023111884,0.00075993885,0.0011646736,0.013658068,0.003990155,0.0156142395,0.003223584,0.006367238,0.004784863],"category_scores_gemma":[0.036719367,0.00062429503,0.00069103955,0.0070778895,0.04683053,0.018321445,0.0073214616,0.0056444826,0.00056955544],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001697627,0.00000869032,0.00017469029,0.000031342057,0.0000020229845,0.000017590592,0.0005409857,0.00022950937,0.000010848645,0.99604493,0.0002618169,0.0026758348],"study_design_scores_gemma":[0.0000077662335,0.000008999594,0.00043468573,0.00027671823,0.000004869528,0.000050871935,0.0010151883,0.0020923708,0.000035045858,0.9847189,0.011346773,0.000007798585],"about_ca_topic_score_codex":0.0021434634,"about_ca_topic_score_gemma":0.0011093318,"teacher_disagreement_score":0.023111884,"about_ca_system_score_codex":0.008416885,"about_ca_system_score_gemma":0.0069976104,"threshold_uncertainty_score":0.12222874},"labels":[],"label_agreement":null},{"id":"W4389154011","doi":"10.18280/ijsdp.181113","title":"Path Dependency and Development Impacts of Megaproject: A Case Study of North Jakarta Bay Reclamation","year":2023,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Megaproject; Land reclamation; Dependency (UML); Bay; Path dependency; Path (computing); Environmental planning; Environmental science; Geography; Civil engineering; Environmental resource management; Engineering; Computer science; Economic geography","score_opus":0.07158323596518419,"score_gpt":0.35596314684870717,"score_spread":0.284379910883523,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389154011","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9917732,0.0001865169,0.00057416223,0.00025168006,0.000006253605,0.000042854437,0.000045781486,0.000005492906,0.0071141035],"genre_scores_gemma":[0.99625266,0.00032348934,0.0006640898,0.000032916865,0.0000023739817,0.00003436897,0.000034656667,0.000007249,0.002648112],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.99853957,0.0007457743,0.000043956035,0.00011722929,0.00022350793,0.0003299713],"domain_scores_gemma":[0.99856997,0.0006119613,0.00026123994,0.00010698082,0.0001911203,0.0002586287],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00125045,0.0003323862,0.00027790852,0.0010003833,0.0065772664,0.0021582835,0.0011508195,0.00079869945,0.004006246],"category_scores_gemma":[0.0016493322,0.0003125714,0.0002255419,0.0020774405,0.00369061,0.001451529,0.0035818117,0.0011672787,0.00024887727],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034459823,0.0009886732,0.21780035,0.00093472516,0.00009454373,0.10149634,0.556075,0.009235216,0.0069596586,0.029753363,0.002844243,0.073473275],"study_design_scores_gemma":[0.000010277838,0.00019168494,0.13389988,0.0002834782,0.000041988216,0.0036042582,0.822757,0.0017836672,0.002436822,0.001959588,0.032987982,0.000043410688],"about_ca_topic_score_codex":0.05285861,"about_ca_topic_score_gemma":0.17776397,"teacher_disagreement_score":0.05285861,"about_ca_system_score_codex":0.00609029,"about_ca_system_score_gemma":0.0049337884,"threshold_uncertainty_score":0.10510188},"labels":[],"label_agreement":null},{"id":"W4389305283","doi":"10.32388/a0k541","title":"Review of: \"Contrasting Construction and Business Projects: Implications for Project Management Techniques\"","year":2023,"lang":"en","type":"peer-review","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Business; Project management; Process management; Engineering management; Engineering; Systems engineering","score_opus":0.19659623092872627,"score_gpt":0.44670911659513535,"score_spread":0.2501128856664091,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389305283","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012900083,0.09291661,0.004670508,0.5494987,0.30037758,0.0010719573,0.0026173156,0.0005008077,0.04705652],"genre_scores_gemma":[0.020234507,0.20504403,0.011600629,0.29306042,0.2830005,0.0017268711,0.0049578254,0.00082660135,0.17954868],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.97287273,0.0063214204,0.0033681751,0.00096834847,0.015806817,0.00066260964],"domain_scores_gemma":[0.7226664,0.08923508,0.00864145,0.004494859,0.17011687,0.004845361],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.031201847,0.00086947635,0.0020220515,0.011125799,0.0032737525,0.0075915684,0.0039490834,0.007471311,0.02054556],"category_scores_gemma":[0.17609371,0.00061979285,0.0009516389,0.008192547,0.0031038977,0.004402217,0.003139911,0.0034791613,0.0115814945],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018117864,0.000011221254,0.000060635903,0.0012068853,0.000010661034,0.000029831564,0.00008396155,0.00002915753,0.00010790916,0.0010349686,0.96634847,0.031058196],"study_design_scores_gemma":[0.000015208627,0.00001954656,0.0014130957,0.0021433302,0.000046119727,0.000052447827,0.00017621677,0.00010704296,0.00020157988,0.00128992,0.9945175,0.000018002927],"about_ca_topic_score_codex":0.014967206,"about_ca_topic_score_gemma":0.047528114,"teacher_disagreement_score":0.031201847,"about_ca_system_score_codex":0.005719357,"about_ca_system_score_gemma":0.029708277,"threshold_uncertainty_score":0.16501313},"labels":[],"label_agreement":null},{"id":"W4389828922","doi":"10.5267/j.jpm.2023.8.002","title":"The impact of triple constraints on the project success, a moderating role of organizational support","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Project management triangle; Pre-construction services; Project management; Project planning; Business; Process management; Quality (philosophy); Project manager; OPM3; Operations management; Engineering; Systems engineering","score_opus":0.0712926642456481,"score_gpt":0.38492103045456166,"score_spread":0.31362836620891354,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389828922","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9969938,0.0001705171,0.00038678973,0.00023854582,0.0000106932775,0.000028062208,0.00005096474,0.0000030891563,0.0021175942],"genre_scores_gemma":[0.9991566,0.00006609074,0.000266553,0.000024577133,0.000007732137,0.00005188194,0.000027319531,0.0000022844474,0.0003970477],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9923711,0.0044876947,0.00046388584,0.0005233179,0.0012015873,0.00095248385],"domain_scores_gemma":[0.9412916,0.036610242,0.010964208,0.0016927829,0.0021057604,0.007335456],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037282365,0.00053582067,0.00041922147,0.00072152773,0.00095360575,0.001922533,0.00063895783,0.00075911876,0.0062582786],"category_scores_gemma":[0.025487386,0.0002304052,0.00040808824,0.00058259757,0.00075694587,0.0010152648,0.0029478832,0.0011242443,0.00029002948],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014959933,0.0020367717,0.92714226,0.0005063011,0.00055685424,0.00069560396,0.008971048,0.00080111873,0.0027681051,0.0023665198,0.00055564736,0.05210382],"study_design_scores_gemma":[0.00006391633,0.0014551794,0.9819709,0.00025024783,0.00029750643,0.00021206867,0.009725383,0.0010636571,0.0008473565,0.001081336,0.003000655,0.00003197394],"about_ca_topic_score_codex":0.0023170721,"about_ca_topic_score_gemma":0.0030517871,"teacher_disagreement_score":0.0062582786,"about_ca_system_score_codex":0.0007518284,"about_ca_system_score_gemma":0.0024493597,"threshold_uncertainty_score":0.020936012},"labels":[],"label_agreement":null},{"id":"W4390272335","doi":"10.3390/su16010244","title":"Integrated Agent-Based Simulation and Game Theory Decision Support Framework for Cash Flow and Payment Management in Construction Projects","year":2023,"lang":"en","type":"article","venue":"Sustainability","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Payment; Cash flow; Stakeholder; Negotiation; Business; Game theory; Risk analysis (engineering); Finance; Economics; Microeconomics","score_opus":0.058741982886073574,"score_gpt":0.39259986213253206,"score_spread":0.3338578792464585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390272335","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030949855,0.0001495445,0.95985645,0.00039300206,0.000038377137,0.00030035342,0.000100643505,0.00023213697,0.007979603],"genre_scores_gemma":[0.67650384,0.00030625728,0.31910583,0.00008332556,0.00002200202,0.0010010838,0.0001695024,0.00003379428,0.0027742789],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983936,0.0010348273,0.0000755255,0.000117437165,0.0002621351,0.00011641141],"domain_scores_gemma":[0.9983986,0.0010742918,0.00012356979,0.000053547392,0.0002414847,0.00010848659],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026077628,0.0009359541,0.0009987887,0.0010985484,0.001007703,0.0025041646,0.001876256,0.0015004657,0.0029976733],"category_scores_gemma":[0.0034760975,0.00048347196,0.0010397463,0.0009426267,0.0010850932,0.0014856184,0.0017274726,0.0012407629,0.00027325962],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003290266,0.00006804864,0.0004713095,0.000033200526,0.000024367146,0.00006851874,0.00011134903,0.96121895,0.00039856098,0.03162692,0.00019037795,0.005755431],"study_design_scores_gemma":[0.000012710545,0.00001878316,0.000052304626,0.000008357917,0.000006007095,0.0000067719466,0.000033028784,0.9936009,0.00010343673,0.005544077,0.0006061986,0.000007390037],"about_ca_topic_score_codex":0.014551462,"about_ca_topic_score_gemma":0.013354665,"teacher_disagreement_score":0.014551462,"about_ca_system_score_codex":0.0024130025,"about_ca_system_score_gemma":0.004152332,"threshold_uncertainty_score":0.028933525},"labels":[],"label_agreement":null},{"id":"W4390500549","doi":"10.33423/ajm.v23i5.6669","title":"From the Absorptive Capacity of Middle Managers and Their Employees to the Commitment in the Implementation of New Work Routines","year":2023,"lang":"en","type":"article","venue":"American Journal of Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Absorptive capacity; Work (physics); Context (archaeology); Process (computing); Reflection (computer programming); Originality; Business; Resource (disambiguation); Knowledge management; Process management; Computer science; Sociology; Qualitative research; Engineering","score_opus":0.09583760302847745,"score_gpt":0.35284502802503936,"score_spread":0.25700742499656193,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390500549","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76843995,0.0018913014,0.036446534,0.016176306,0.00013005474,0.0001517514,0.000038740458,0.0000716892,0.17665361],"genre_scores_gemma":[0.9951821,0.0002990551,0.0020263344,0.00028991967,0.000021072952,0.000043606124,0.000007044386,0.0000069997322,0.0021238495],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99522805,0.0022716764,0.00017213289,0.00035488224,0.0009706083,0.0010026726],"domain_scores_gemma":[0.9866648,0.006541749,0.0017696915,0.0010045697,0.0010085303,0.003010591],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007068646,0.00035563775,0.00021542089,0.0013713862,0.0023255078,0.008556753,0.0009814436,0.001335226,0.0037783019],"category_scores_gemma":[0.012182226,0.0004418761,0.00032384286,0.00079494435,0.010745396,0.0049563013,0.007282935,0.0023838028,0.00040182602],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029196191,0.00048041105,0.064477056,0.00048586543,0.00008966058,0.0010629181,0.18720822,0.0015368228,0.0046987906,0.6137094,0.002537843,0.12342102],"study_design_scores_gemma":[0.000101018035,0.0008651101,0.1332828,0.0014021668,0.0001145593,0.0016867855,0.2624839,0.0056638434,0.004729902,0.48280537,0.106630154,0.00023454204],"about_ca_topic_score_codex":0.0020430477,"about_ca_topic_score_gemma":0.0018085135,"teacher_disagreement_score":0.008556753,"about_ca_system_score_codex":0.0021379853,"about_ca_system_score_gemma":0.005869374,"threshold_uncertainty_score":0.03738302},"labels":[],"label_agreement":null},{"id":"W4390718941","doi":"10.20944/preprints202401.0837.v1","title":"Using Lean in Deconstruction Projects for Maximizing the Reuse of Materials: A Canadian Case Study","year":2024,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure; Université de Montréal","funders":"École de technologie supérieure","keywords":"Deconstruction (building); Demolition; Reuse; Lean construction; Process (computing); Sustainability; Demolition waste; Circular economy; Architectural engineering; Process management; Engineering; Construction industry; Management science; Business; Computer science; Construction engineering; Civil engineering; Waste management","score_opus":0.5502158597793589,"score_gpt":0.48391782395583066,"score_spread":0.06629803582352828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390718941","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9648981,0.00041545936,0.0053772256,0.0010863522,0.00000999015,0.00054797815,0.000282004,0.000035411944,0.02734747],"genre_scores_gemma":[0.9815568,0.0007006007,0.009660197,0.000089564914,0.0000029967332,0.00010605932,0.00012688749,0.000017720235,0.0077390363],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.99674463,0.0011590254,0.00009155246,0.00019223345,0.0009225305,0.0008899005],"domain_scores_gemma":[0.99723154,0.0010210421,0.00018055995,0.00016512701,0.00095211033,0.0004496484],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035997082,0.00066646375,0.0003463789,0.0019921816,0.0077700303,0.0026006103,0.0018400274,0.0012882095,0.0017068345],"category_scores_gemma":[0.003995662,0.00031744855,0.0004001794,0.0050119413,0.0033534358,0.00091927906,0.0017171083,0.0008672006,0.00019093018],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019334699,0.004919189,0.14036864,0.00198021,0.00018817556,0.043100003,0.15483685,0.17276286,0.023080887,0.1054486,0.015669888,0.33571115],"study_design_scores_gemma":[0.00043405272,0.0022382084,0.17094254,0.0011077854,0.00023571326,0.0039768256,0.42242515,0.1133418,0.02632583,0.009772194,0.24873516,0.00046473695],"about_ca_topic_score_codex":0.8941083,"about_ca_topic_score_gemma":0.9583071,"teacher_disagreement_score":0.105891705,"about_ca_system_score_codex":0.04816197,"about_ca_system_score_gemma":0.039097454,"threshold_uncertainty_score":0.34944117},"labels":[],"label_agreement":null},{"id":"W4390886133","doi":"10.1522/revueot.v32n3.1692","title":"Romero-Torres, A., Brunet, M., Lalonde, B. et Aubry, M. (2023) La maturité en gestion de projet : améliorer la performance organisationnelle. PUQ.","year":2024,"lang":"fr","type":"article","venue":"Revue Organisations & territoires","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Sociology; Psychology","score_opus":0.022016828470982134,"score_gpt":0.2933699280615696,"score_spread":0.27135309959058745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390886133","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010929549,0.5602002,0.012377802,0.20360506,0.014341211,0.00014036793,0.0019461033,0.00051583844,0.19594389],"genre_scores_gemma":[0.1799376,0.46358892,0.026855975,0.011363908,0.007585464,0.00034309927,0.0029016181,0.00069057243,0.30673298],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9964139,0.00077401404,0.00018504196,0.00026707764,0.0020816654,0.00027830937],"domain_scores_gemma":[0.98545223,0.006646022,0.0016492857,0.0005269403,0.0049561257,0.00076945324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0048279297,0.0009630926,0.00052362995,0.0029976147,0.0020242918,0.0061438223,0.001407626,0.003404086,0.025120059],"category_scores_gemma":[0.015169759,0.0004947369,0.0004817537,0.0035261181,0.0018589381,0.006042024,0.001530987,0.0035050889,0.009736614],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028646868,0.00007591747,0.0032251913,0.0017035482,0.000029963623,0.00019601708,0.002235798,0.00033414713,0.0012349468,0.037330482,0.58541644,0.36793113],"study_design_scores_gemma":[0.00003887382,0.00011881919,0.017337129,0.0013878308,0.000047824327,0.000310967,0.00202624,0.00015577892,0.001205451,0.008477922,0.96883595,0.000057220543],"about_ca_topic_score_codex":0.04099358,"about_ca_topic_score_gemma":0.07134784,"teacher_disagreement_score":0.04099358,"about_ca_system_score_codex":0.0041026385,"about_ca_system_score_gemma":0.00568742,"threshold_uncertainty_score":0.08403492},"labels":[],"label_agreement":null},{"id":"W4391238844","doi":"10.1007/s44268-024-00025-7","title":"Unveiling global research trends in construction productivity: a scientometric analysis of twenty-first century research","year":2024,"lang":"en","type":"article","venue":"Smart Construction and Sustainable Cities","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Regional science; Scientometrics; Economic geography; Geography; Sociology; Economics; Social science; Economic growth","score_opus":0.12880946874650467,"score_gpt":0.4424689900351253,"score_spread":0.3136595212886206,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391238844","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":"evaluation","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":"evaluation","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90349174,0.035120744,0.0060956785,0.0032562816,0.00037240767,0.00034064037,0.019627616,0.00019519233,0.031499695],"genre_scores_gemma":[0.9595122,0.019544978,0.0064347675,0.00029396985,0.0006077877,0.0004114759,0.011438418,0.00008507617,0.0016712998],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98826575,0.0022481882,0.0022285131,0.0010871207,0.0054994747,0.00067099754],"domain_scores_gemma":[0.91071564,0.04733099,0.017426955,0.003915672,0.018259747,0.0023510028],"candidate_categories":["metaresearch","bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.014698771,0.00061593106,0.0011332317,0.1524281,0.0013111095,0.00975102,0.00063359895,0.0006875526,0.0028248848],"category_scores_gemma":[0.055814236,0.00025543664,0.0013593937,0.20135324,0.0012989653,0.0061992416,0.0036642326,0.0006328162,0.00078332605],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020743435,0.00015807358,0.6809368,0.0075527923,0.0014336687,0.0011808309,0.015568691,0.0024034653,0.0030896384,0.013366824,0.013888976,0.26021275],"study_design_scores_gemma":[0.000017897082,0.00015930198,0.9000341,0.0017836111,0.0004353876,0.00080446765,0.016325781,0.003537029,0.0015303635,0.0053331554,0.06994409,0.000094830364],"about_ca_topic_score_codex":0.0028632993,"about_ca_topic_score_gemma":0.0038314897,"teacher_disagreement_score":0.98530126,"about_ca_system_score_codex":0.0020752302,"about_ca_system_score_gemma":0.0033967174,"threshold_uncertainty_score":0.07773548},"labels":[{"model":"gemma","categories":["bibliometrics"],"domain":null,"study_design":"observational","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":["bibliometrics"],"domain":null,"study_design":"design_other","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"high"}],"label_agreement":"split"},{"id":"W4391350365","doi":"10.31803/tg-20221202130111","title":"Application of Probability-based Multi-objective Optimization in Portfolio Investment and Engineering Management Problem","year":2024,"lang":"en","type":"article","venue":"Tehnički glasnik","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Science North","funders":"","keywords":"Portfolio; Portfolio optimization; Investment (military); Project portfolio management; Investment portfolio; Multi-objective optimization; Investment strategy; Mathematical optimization; Computer science; Operations research; Business; Engineering; Mathematics; Project management; Finance; Systems engineering","score_opus":0.031221614835027393,"score_gpt":0.302813364791725,"score_spread":0.2715917499566976,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391350365","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0067696217,0.00054503867,0.99061525,0.0001663921,0.00002097039,0.00003799471,0.0000092402015,0.000023718236,0.001811859],"genre_scores_gemma":[0.74043244,0.001547511,0.2548384,0.0001466891,0.00009819083,0.00047716807,0.000045588877,0.000032466138,0.0023814964],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975592,0.0014465507,0.000108958266,0.00031241952,0.00043008718,0.0001428169],"domain_scores_gemma":[0.9986701,0.001034611,0.00008918734,0.000040589235,0.00013652985,0.000028946635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003571719,0.0010212151,0.0012823311,0.0006830069,0.00047227336,0.0013396613,0.0008158474,0.0011659041,0.000947773],"category_scores_gemma":[0.0037285963,0.0005231201,0.0009986194,0.0009118931,0.0011420149,0.0014527246,0.0012060306,0.0012078368,0.000086152584],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028758934,0.00003528504,0.00043395156,0.0001312268,0.00006644589,0.000044924996,0.00003097518,0.9430287,0.00091430795,0.038359717,0.00023388262,0.016691925],"study_design_scores_gemma":[0.000008117344,0.00005838343,0.00013217753,0.000009251679,0.000016033915,0.000012954838,0.000007757467,0.9867265,0.00037110146,0.0123426225,0.00030758616,0.000007507609],"about_ca_topic_score_codex":0.0017291567,"about_ca_topic_score_gemma":0.00090264314,"teacher_disagreement_score":0.003571719,"about_ca_system_score_codex":0.0009881788,"about_ca_system_score_gemma":0.0014992302,"threshold_uncertainty_score":0.018889308},"labels":[],"label_agreement":null},{"id":"W4391424886","doi":"10.1007/978-3-031-35471-7_47","title":"Methodological Analysis of KPIs to Evaluate Contractor Performance of the Construction Project","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Performance indicator; Construction engineering; Engineering; Business; Marketing","score_opus":0.14088184929236333,"score_gpt":0.37353971746414427,"score_spread":0.23265786817178094,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391424886","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41488943,0.0033062964,0.5178707,0.0017180376,0.00016218894,0.0020525914,0.0019985046,0.00024748934,0.05775477],"genre_scores_gemma":[0.8139802,0.00056018267,0.18213382,0.00007620224,0.000035805064,0.00088526274,0.000707668,0.000036368947,0.0015845397],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.95397216,0.031720985,0.0032574136,0.001541459,0.00867555,0.0008323878],"domain_scores_gemma":[0.85841787,0.1079515,0.0073390612,0.0042335307,0.021332523,0.0007255008],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.04269895,0.0009945424,0.00070464873,0.010846611,0.0009932682,0.005061792,0.0015597541,0.000856189,0.0022833126],"category_scores_gemma":[0.1200015,0.00041320108,0.0013754717,0.0109863,0.0019486238,0.0031798996,0.0016523178,0.0015887461,0.0003262771],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014745994,0.0010545801,0.11564709,0.0030338906,0.0012342955,0.0002397773,0.0048565515,0.06347679,0.0055876127,0.34555057,0.0032367625,0.45460737],"study_design_scores_gemma":[0.0004423041,0.0041743475,0.17809162,0.0017595296,0.0012619806,0.0006332089,0.017942006,0.5346262,0.017730033,0.22344203,0.019593373,0.00030333118],"about_ca_topic_score_codex":0.0069600577,"about_ca_topic_score_gemma":0.0060755205,"teacher_disagreement_score":0.04269895,"about_ca_system_score_codex":0.007243948,"about_ca_system_score_gemma":0.008199981,"threshold_uncertainty_score":0.22581631},"labels":[],"label_agreement":null},{"id":"W4391520415","doi":"10.4236/ti.2024.151001","title":"The Misconception of the Roles and Responsibilities of a Project Management Office (PMO) in Malaysian Banking Sectors","year":2024,"lang":"en","type":"article","venue":"Technology and Investment","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Process management; Public relations; Accounting; Political science","score_opus":0.033161759953088815,"score_gpt":0.32160351022168565,"score_spread":0.28844175026859686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391520415","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49386626,0.0344634,0.070426136,0.25266668,0.002179894,0.00015716108,0.00020299779,0.00015090773,0.14588654],"genre_scores_gemma":[0.97322977,0.008305783,0.007283997,0.0059713563,0.00023791236,0.000058316222,0.00002236324,0.00004755679,0.0048429836],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9799929,0.013645862,0.0014147476,0.0014862401,0.002431615,0.0010286806],"domain_scores_gemma":[0.9574885,0.028018372,0.005621986,0.0018729384,0.0046386104,0.0023595758],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020202797,0.00036651475,0.00020015195,0.0018210956,0.0044479743,0.007787655,0.0014825976,0.0019779361,0.00093286077],"category_scores_gemma":[0.028175892,0.00053581165,0.00020314127,0.0021794236,0.022984544,0.0071009453,0.004006528,0.004673007,0.00034935132],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000092276496,0.000080188955,0.023572577,0.0010263093,0.000022843979,0.00083349127,0.25181866,0.0016890912,0.0010101662,0.5359116,0.018855039,0.16508768],"study_design_scores_gemma":[0.00002633425,0.00016152342,0.037260722,0.0063360375,0.000027660215,0.0025715437,0.28083405,0.0031149515,0.002535208,0.11954773,0.547393,0.00019116224],"about_ca_topic_score_codex":0.014624181,"about_ca_topic_score_gemma":0.01807475,"teacher_disagreement_score":0.020202797,"about_ca_system_score_codex":0.0067686965,"about_ca_system_score_gemma":0.008698107,"threshold_uncertainty_score":0.10684389},"labels":[],"label_agreement":null},{"id":"W4391734241","doi":"10.53935/jomw.v2021i1.135","title":"Integrated Knowledge Management, Organisational Learning and Innovation Model for the Construction Industry","year":2022,"lang":"en","type":"article","venue":"Journal of Management World","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"George Brown College","funders":"","keywords":"Knowledge management; Business; Learning organization; Construction industry; Process management; Engineering management; Engineering; Computer science; Construction engineering","score_opus":0.10580571055850822,"score_gpt":0.3688644841771479,"score_spread":0.26305877361863966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391734241","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051621582,0.0029975553,0.62336355,0.017891617,0.00046185858,0.00086443324,0.00077163894,0.0004034977,0.3016243],"genre_scores_gemma":[0.76803666,0.003564345,0.16999017,0.0008224292,0.00020909218,0.0017800636,0.00053427584,0.000045349952,0.055017587],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99888104,0.00035210972,0.00006829416,0.00016957539,0.0003712213,0.00015761369],"domain_scores_gemma":[0.99925727,0.0003050227,0.00010602217,0.000046677902,0.00016741829,0.00011767749],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013132397,0.00062733627,0.0004721768,0.0019088781,0.0012716826,0.0038588573,0.0020216405,0.0030213057,0.0051457835],"category_scores_gemma":[0.0016674425,0.00024113784,0.00086186215,0.0018675036,0.0019234283,0.0032515884,0.0023496544,0.0016586842,0.0013026989],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003305392,0.00017212151,0.0011325815,0.00013081098,0.000027156242,0.00039039814,0.00084706803,0.06708607,0.00052207505,0.90218234,0.0032566055,0.024219645],"study_design_scores_gemma":[0.000091582406,0.00020923294,0.0016593641,0.00019244602,0.00006873119,0.00053164054,0.0008452283,0.35719147,0.00043383852,0.58553076,0.053179156,0.00006648105],"about_ca_topic_score_codex":0.007163135,"about_ca_topic_score_gemma":0.00634091,"teacher_disagreement_score":0.007163135,"about_ca_system_score_codex":0.0033964706,"about_ca_system_score_gemma":0.004696027,"threshold_uncertainty_score":0.024643183},"labels":[],"label_agreement":null},{"id":"W4391841466","doi":"10.1080/21681015.2024.2315942","title":"Adopting construction 4.0 to promote sustainability in the Mekong Delta of Vietnam: a fuzzy delphi study","year":2024,"lang":"en","type":"article","venue":"Journal of Industrial and Production Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Sustainability; Context (archaeology); Business; Delphi method; Knowledge management; Process (computing); Delphi; Process management; Critical success factor; Analytic hierarchy process; Mekong delta; Computer science; Operations research; Engineering; Geography","score_opus":0.08061985205386069,"score_gpt":0.3436185682717553,"score_spread":0.2629987162178946,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391841466","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9970386,0.000027412805,0.0007004146,0.00021261694,0.0000033915712,0.00013879905,0.000015167026,9.823814e-7,0.0018624555],"genre_scores_gemma":[0.9977647,0.00013786663,0.0010553156,0.000103113875,0.0000013322107,0.00018520307,0.000017689965,0.0000015192994,0.00073332764],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9955687,0.0028834816,0.00016327656,0.00016212309,0.00038481082,0.00083768583],"domain_scores_gemma":[0.995083,0.0031554557,0.0002750314,0.000099108045,0.00091747893,0.0004700145],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0086519085,0.0003525065,0.0002702572,0.0013631268,0.0037782392,0.0016241418,0.00057166046,0.0007076218,0.0015046397],"category_scores_gemma":[0.0074037113,0.00042093822,0.0002524049,0.0010898858,0.0016832887,0.0015274835,0.002000859,0.00083706446,0.00014866474],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021757817,0.0007512491,0.09772885,0.00047610447,0.00003426968,0.0017550963,0.8425476,0.0019552943,0.004035084,0.008727817,0.0011494232,0.040621612],"study_design_scores_gemma":[0.000009882633,0.00022099554,0.019740133,0.0001407474,0.000008667051,0.00014498399,0.97193426,0.0021200564,0.0005947862,0.0007599882,0.0042959573,0.000029429255],"about_ca_topic_score_codex":0.02309882,"about_ca_topic_score_gemma":0.031011684,"teacher_disagreement_score":0.02309882,"about_ca_system_score_codex":0.004243529,"about_ca_system_score_gemma":0.0062160557,"threshold_uncertainty_score":0.045928776},"labels":[],"label_agreement":null},{"id":"W4392079967","doi":"10.3390/su16051816","title":"Using Lean in Deconstruction Projects for Maximising the Reuse of Materials: A Canadian Case Study","year":2024,"lang":"en","type":"article","venue":"Sustainability","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure; Université de Montréal","funders":"","keywords":"Deconstruction (building); Demolition; Reuse; Lean construction; Process (computing); Sustainability; Circular economy; Architectural engineering; Demolition waste; Engineering; Process management; Construction industry; Management science; Construction engineering; Computer science; Civil engineering; Waste management","score_opus":0.20510846112595105,"score_gpt":0.4566088277627329,"score_spread":0.2515003666367819,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392079967","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9632387,0.00036966597,0.005765011,0.0011129845,0.000010708786,0.00060130167,0.00019854844,0.000037687663,0.028665444],"genre_scores_gemma":[0.9792677,0.00067973597,0.011030244,0.00009678328,0.0000028768768,0.0001175917,0.00009579723,0.000018777044,0.0086904215],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99657816,0.0012832115,0.0000898369,0.00017561187,0.0010005286,0.00087259663],"domain_scores_gemma":[0.9973955,0.00097582274,0.00017046889,0.00016158381,0.00085223466,0.00044435533],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003623422,0.0006629978,0.0003274672,0.0019145982,0.00870554,0.0026599283,0.0019179938,0.0013214464,0.0017303671],"category_scores_gemma":[0.0040062745,0.00033460636,0.00038133646,0.004413322,0.0037162844,0.0009548727,0.001949507,0.00093056605,0.0001851267],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016361678,0.004467794,0.11926253,0.0017968012,0.00015212817,0.050996546,0.21832408,0.11587557,0.02370104,0.09175843,0.014363588,0.35766533],"study_design_scores_gemma":[0.00032216468,0.0019573346,0.12741342,0.001002671,0.00017563874,0.004782443,0.48735327,0.07647948,0.024354005,0.0075211697,0.26824728,0.00039115924],"about_ca_topic_score_codex":0.864352,"about_ca_topic_score_gemma":0.9503607,"teacher_disagreement_score":0.13564801,"about_ca_system_score_codex":0.042965394,"about_ca_system_score_gemma":0.038951665,"threshold_uncertainty_score":0.31173724},"labels":[],"label_agreement":null},{"id":"W4392530509","doi":"","title":"Culture de risque dans des compagnies multinationales : Cas d’étude d’une Multinationale dans le secteur de l’ingénierie et de la construction","year":2018,"lang":"fr","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"University of Oxford; National Aeronautics and Space Administration","keywords":"Multinational corporation; Business; Engineering; Manufacturing engineering; Finance","score_opus":0.023038279189103228,"score_gpt":0.29458546460193047,"score_spread":0.27154718541282724,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392530509","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86589193,0.0011897369,0.0034264997,0.010237919,0.00008680746,0.00006546599,0.00006600752,0.000018043867,0.119017564],"genre_scores_gemma":[0.9876238,0.0004626937,0.0007511661,0.00052892324,0.000012179861,0.000038768845,0.000027980104,0.00001696901,0.010537551],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99180555,0.0042915163,0.00020744304,0.0007372802,0.0017604413,0.0011976407],"domain_scores_gemma":[0.98869205,0.0048076757,0.0014934449,0.0006837456,0.0027328313,0.0015903065],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008609371,0.00039792262,0.0004344437,0.002038331,0.014955549,0.009537794,0.0010865601,0.0011559068,0.0065806387],"category_scores_gemma":[0.011509451,0.0003305713,0.00026332217,0.0036146322,0.015459553,0.004672149,0.005979735,0.002924541,0.00034800972],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037632344,0.000049923743,0.045891363,0.000109568035,0.000024460664,0.0005395422,0.7844797,0.0001711723,0.0005762396,0.1454522,0.0020466694,0.020621547],"study_design_scores_gemma":[0.000009112467,0.000034181023,0.05063903,0.00024518365,0.000022136084,0.00020182303,0.8389825,0.00035815634,0.00041242474,0.012279296,0.09677852,0.00003760924],"about_ca_topic_score_codex":0.28167492,"about_ca_topic_score_gemma":0.37329018,"teacher_disagreement_score":0.28167492,"about_ca_system_score_codex":0.022709455,"about_ca_system_score_gemma":0.018004252,"threshold_uncertainty_score":0.56007075},"labels":[],"label_agreement":null},{"id":"W4392896810","doi":"10.1061/9780784485286.060","title":"Application of Chaos Theory in Project Management","year":2024,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Alberta Environment and Protected Areas","funders":"","keywords":"Chaos theory; Computer science; CHAOS (operating system); Management science; Context (archaeology); Project management; Systems engineering; Engineering; Artificial intelligence; Computer security","score_opus":0.06107902622532895,"score_gpt":0.4001470605392215,"score_spread":0.33906803431389254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392896810","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033268478,0.014805914,0.83811295,0.009760214,0.0005847319,0.00019269012,0.00016256384,0.00017513541,0.10293734],"genre_scores_gemma":[0.86779875,0.014619404,0.10605578,0.000527065,0.00065328385,0.0003117374,0.00009417556,0.00005913088,0.00988065],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9984755,0.00063853076,0.00009591782,0.00016283075,0.000495491,0.0001316711],"domain_scores_gemma":[0.99822503,0.0010872706,0.00021647636,0.00011968649,0.00024713797,0.0001044422],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016327354,0.00042947184,0.00053354434,0.0018809357,0.0013366498,0.002107997,0.00065269147,0.0010985023,0.0022420604],"category_scores_gemma":[0.004067224,0.00026188453,0.00080635364,0.0013874256,0.0029588551,0.0018329665,0.0022225059,0.0015390518,0.0003556064],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013153262,0.000019546376,0.001525462,0.00014127826,0.000034045723,0.00014483923,0.0005940979,0.053938773,0.00067379716,0.90079516,0.0018569181,0.040262945],"study_design_scores_gemma":[0.00001394566,0.00006873347,0.0016135655,0.00019256052,0.000017057826,0.00017588821,0.00032946194,0.122744076,0.00074578566,0.840239,0.033808053,0.000051857023],"about_ca_topic_score_codex":0.0028100824,"about_ca_topic_score_gemma":0.0015245264,"teacher_disagreement_score":0.0028100824,"about_ca_system_score_codex":0.0024158682,"about_ca_system_score_gemma":0.0026913953,"threshold_uncertainty_score":0.017528415},"labels":[],"label_agreement":null},{"id":"W4392896887","doi":"10.1061/9780784485293.017","title":"The University of Alberta’s Construction Innovation Centre (CIC): Academia-Industry Collaboration for High-Impact Research","year":2024,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"The Metabolomics Innovation Centre; University of Alberta","funders":"","keywords":"Productivity; Government (linguistics); Business; Construction industry; Process (computing); Knowledge management; Engineering management; Competitive advantage; Engineering; Marketing; Computer science; Economic growth; Construction engineering","score_opus":0.13383579165798484,"score_gpt":0.4463295769674509,"score_spread":0.31249378530946603,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392896887","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.089652464,0.030842738,0.12364028,0.14728588,0.0056201196,0.005022108,0.0036533235,0.0046987017,0.5895843],"genre_scores_gemma":[0.56314,0.012529706,0.23165995,0.007843486,0.00059687597,0.0018168489,0.0027479895,0.00067406765,0.17899106],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9789796,0.0044869143,0.00051402877,0.0010974735,0.010273852,0.004648048],"domain_scores_gemma":[0.95222217,0.004849457,0.0013948126,0.0021639385,0.014567078,0.024802411],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.018217586,0.000780111,0.0006869189,0.0063077826,0.01631536,0.01607585,0.0026876698,0.003299092,0.011737098],"category_scores_gemma":[0.016177269,0.00058877206,0.00062299863,0.005876557,0.0073185298,0.0028894187,0.013645709,0.0032082468,0.002452083],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036910924,0.0004336649,0.022976888,0.0013527549,0.00008049008,0.0011385349,0.01332032,0.0022705912,0.0057373494,0.24945661,0.28629726,0.41656643],"study_design_scores_gemma":[0.000074693315,0.00018451035,0.023705713,0.0008493703,0.000039017188,0.00031151107,0.013040935,0.0015207616,0.00262449,0.024350723,0.93314856,0.00014977687],"about_ca_topic_score_codex":0.65052164,"about_ca_topic_score_gemma":0.80609024,"teacher_disagreement_score":0.65052164,"about_ca_system_score_codex":0.04573251,"about_ca_system_score_gemma":0.3185402,"threshold_uncertainty_score":0.703073},"labels":[],"label_agreement":null},{"id":"W4393130806","doi":"10.51594/estj.v5i3.959","title":"AI IN PROJECT MANAGEMENT: EXPLORING THEORETICAL MODELS FOR DECISION-MAKING AND RISK MANAGEMENT","year":2024,"lang":"en","type":"article","venue":"Engineering Science & Technology Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":72,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hamilton Medical Research Group","funders":"","keywords":"Risk management; Management science; Project risk management; Process management; Computer science; Risk analysis (engineering); Project management; Engineering; Business; Program management; Management; Systems engineering; Economics","score_opus":0.0361835312058656,"score_gpt":0.3442262722553028,"score_spread":0.3080427410494372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393130806","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031106608,0.004970721,0.84777516,0.020751117,0.00032944017,0.0002624553,0.000282939,0.00015097564,0.094370544],"genre_scores_gemma":[0.8016956,0.0056697447,0.17964242,0.0010729585,0.00045762508,0.00067069917,0.00020063794,0.00008668741,0.010503693],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99272656,0.0042166836,0.00042924177,0.0009610861,0.0010871112,0.0005793286],"domain_scores_gemma":[0.9614716,0.030831669,0.0031632406,0.0015420374,0.0019830086,0.0010084532],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010694097,0.0013530807,0.0010828911,0.0042597093,0.0025161314,0.0098974975,0.002973278,0.0035716423,0.01010907],"category_scores_gemma":[0.025874637,0.0008777015,0.0020957373,0.0031839695,0.010670249,0.009609688,0.0034824861,0.0037018112,0.00097550894],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013971648,0.000058834277,0.0012671904,0.00010132241,0.000039325027,0.00007924994,0.00069669756,0.028981192,0.000059237278,0.95582217,0.0009736812,0.011907082],"study_design_scores_gemma":[0.000010794123,0.000020958169,0.00028983166,0.00010971602,0.000012403183,0.0000488471,0.00043405464,0.07133608,0.00004231422,0.9227059,0.0049685556,0.000020590762],"about_ca_topic_score_codex":0.009491445,"about_ca_topic_score_gemma":0.005768486,"teacher_disagreement_score":0.010694097,"about_ca_system_score_codex":0.0068254387,"about_ca_system_score_gemma":0.005585397,"threshold_uncertainty_score":0.056556463},"labels":[],"label_agreement":null},{"id":"W4394203776","doi":"10.6084/m9.figshare.20759257","title":"Identifying causes of disputes associated with binding dispute resolution: A perspective from the Quebec construction industry","year":2022,"lang":"en","type":"dataset","venue":"Figshare","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Perspective (graphical); Dispute resolution; Business; Political science; Computer science; Law; Artificial intelligence","score_opus":0.14769781930251683,"score_gpt":0.36269190321265926,"score_spread":0.21499408391014244,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394203776","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2549688,0.0005274145,0.0021136194,0.00448154,0.000048039616,0.0012761832,0.6600449,0.00018102645,0.07635846],"genre_scores_gemma":[0.51727045,0.0011275231,0.0068950504,0.0009959589,0.000050129394,0.0040250225,0.38797566,0.00013224983,0.081528105],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981893,0.00046013968,0.0001068546,0.00020480141,0.00051467435,0.00052422617],"domain_scores_gemma":[0.987807,0.0048844935,0.0006959016,0.00044566253,0.005631473,0.0005355218],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028026497,0.00042178252,0.00023449953,0.005906383,0.0038201823,0.00253694,0.0014949519,0.0009034859,0.03099064],"category_scores_gemma":[0.014325047,0.00032800745,0.00035303415,0.012843817,0.0006785913,0.001367023,0.0014474157,0.000927856,0.002312667],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020120954,0.00020179333,0.19514704,0.00086854777,0.000049409537,0.0007707113,0.056955516,0.002514413,0.0006815187,0.02067014,0.65970397,0.0622357],"study_design_scores_gemma":[0.000059087393,0.000027411135,0.473236,0.0010517883,0.000039050698,0.00012154867,0.13553858,0.0032807959,0.00090698875,0.0016118602,0.3840449,0.00008202557],"about_ca_topic_score_codex":0.9815425,"about_ca_topic_score_gemma":0.987571,"teacher_disagreement_score":0.03618208,"about_ca_system_score_codex":0.03618208,"about_ca_system_score_gemma":0.040554356,"threshold_uncertainty_score":0.26252055},"labels":[],"label_agreement":null},{"id":"W4394785680","doi":"10.1177/87569728241241506","title":"Project Governance and Governance of Interorganizational Project Networks: Toward Understanding Their Relationships and Future Research Agenda","year":2024,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Project governance; Corporate governance; Network governance; Key (lock); Project management; Business; Process management; Knowledge management; Political science; Management; Computer science; Economics","score_opus":0.289141534832872,"score_gpt":0.40683879482447144,"score_spread":0.11769725999159941,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394785680","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42531723,0.04238593,0.25904894,0.105782546,0.00036109833,0.00046013744,0.00020586824,0.000078774,0.16635962],"genre_scores_gemma":[0.97862077,0.009314161,0.01012488,0.0004281893,0.00012934346,0.00015046993,0.00004770262,0.000009351006,0.001175172],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99117506,0.0061855307,0.0002722859,0.00063964946,0.00087630725,0.0008513183],"domain_scores_gemma":[0.9658504,0.020835165,0.0066720583,0.0016969922,0.0029087611,0.0020366402],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011134816,0.00030660388,0.00062144786,0.0028788655,0.0015019015,0.008015538,0.0012252085,0.0019360137,0.0020076567],"category_scores_gemma":[0.023512878,0.00039900973,0.0004005196,0.0046233432,0.01046438,0.012680289,0.0035094668,0.0020579817,0.00013172558],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013980841,0.000068813744,0.021198342,0.00017469746,0.00002743065,0.000085937,0.0030619523,0.004511079,0.00013930579,0.94734955,0.0007776614,0.022591276],"study_design_scores_gemma":[0.00001516788,0.000087795546,0.032191835,0.0008844718,0.000025784804,0.00013918811,0.017113397,0.014109343,0.00024744173,0.9027273,0.032416802,0.000041548123],"about_ca_topic_score_codex":0.0039720773,"about_ca_topic_score_gemma":0.0034572196,"teacher_disagreement_score":0.011134816,"about_ca_system_score_codex":0.0045487923,"about_ca_system_score_gemma":0.0057617924,"threshold_uncertainty_score":0.058887243},"labels":[],"label_agreement":null},{"id":"W4395031431","doi":"10.29173/alr2767","title":"Collaborative Construction Contracts","year":2023,"lang":"en","type":"article","venue":"Alberta Law Review","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business","score_opus":0.062073564452627246,"score_gpt":0.3863758035100615,"score_spread":0.32430223905743427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4395031431","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005207049,0.031902175,0.018064965,0.033193007,0.0013451608,0.00043274026,0.00045578688,0.00016849533,0.90923053],"genre_scores_gemma":[0.32100844,0.05476473,0.017974474,0.031155735,0.0011423281,0.0007714076,0.0011762499,0.00025937278,0.5717473],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9567565,0.006489373,0.0016047349,0.0035737804,0.026607739,0.004967986],"domain_scores_gemma":[0.9661706,0.010338298,0.0014669735,0.0037956308,0.01576763,0.0024607864],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02156353,0.0006744813,0.0006462356,0.0029478874,0.011382961,0.010424643,0.0055822646,0.007946203,0.017479952],"category_scores_gemma":[0.037027277,0.00090221537,0.00083381764,0.0064156945,0.012480592,0.004582167,0.0059176097,0.006174997,0.0025552171],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011721126,0.000023445058,0.00037549352,0.00022609519,0.000009770101,0.00014592904,0.0010577679,0.00095605216,0.000082562816,0.85135823,0.09153457,0.054218452],"study_design_scores_gemma":[0.000011953089,0.000012679263,0.0006477318,0.0004209358,0.0000102455215,0.000114712515,0.0005489527,0.0003741726,0.00009641327,0.024877984,0.9728621,0.000022136765],"about_ca_topic_score_codex":0.6908607,"about_ca_topic_score_gemma":0.6721453,"teacher_disagreement_score":0.6908607,"about_ca_system_score_codex":0.05101319,"about_ca_system_score_gemma":0.13906153,"threshold_uncertainty_score":0.62191975},"labels":[],"label_agreement":null},{"id":"W4395066516","doi":"10.5539/ibr.v17n2p66","title":"Best Practices and Implementation Challenges in Effective Project Management","year":2024,"lang":"en","type":"article","venue":"International Business Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Best practice; Process management; Operations management; Engineering management; Computer science; Economics; Management; Engineering","score_opus":0.4371557453033774,"score_gpt":0.5906178626738594,"score_spread":0.153462117370482,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4395066516","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09410335,0.027273374,0.29439053,0.46044338,0.0021027222,0.0012077612,0.00010142469,0.00094186654,0.119435616],"genre_scores_gemma":[0.5437524,0.01429049,0.4200341,0.012258474,0.00045126412,0.0022796865,0.00015978474,0.0003807799,0.006393045],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.6931772,0.1878,0.020796642,0.010575466,0.077900164,0.009750533],"domain_scores_gemma":[0.72510326,0.1507885,0.024638193,0.032366253,0.05549631,0.011607483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.18520959,0.0017158558,0.0013501908,0.006242552,0.01012543,0.04271898,0.008555285,0.010751836,0.002386697],"category_scores_gemma":[0.22808628,0.0025075616,0.0010532993,0.0059132297,0.022663966,0.030212047,0.015892984,0.012610792,0.0014945662],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009908311,0.0016394265,0.012648659,0.0044405097,0.00025138783,0.001135486,0.06447875,0.010053007,0.0015841222,0.32038528,0.026794005,0.5564902],"study_design_scores_gemma":[0.00013637428,0.00080905145,0.005537657,0.014313686,0.0001167339,0.0013124289,0.119449206,0.0080849035,0.0030779508,0.612028,0.23474728,0.0003868209],"about_ca_topic_score_codex":0.005663463,"about_ca_topic_score_gemma":0.0065136924,"teacher_disagreement_score":0.18520959,"about_ca_system_score_codex":0.014121239,"about_ca_system_score_gemma":0.04856703,"threshold_uncertainty_score":0.9794936},"labels":[],"label_agreement":null},{"id":"W4395089776","doi":"10.1155/2024/8780539","title":"Development of a Performance Assessment Model for Contractors in Saudi Arabian Construction Projects","year":2024,"lang":"en","type":"article","venue":"Advances in Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"King Saud University","keywords":"Construction engineering; Civil engineering; Engineering; Computer science; Mining engineering","score_opus":0.04998111819775424,"score_gpt":0.3525528612695523,"score_spread":0.30257174307179807,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4395089776","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.557505,0.0004109731,0.4161651,0.0014479869,0.000050307895,0.0008074974,0.00043668263,0.0002533741,0.022923011],"genre_scores_gemma":[0.9568289,0.0003034784,0.039495695,0.00003231122,0.000012212754,0.0005014488,0.00023044413,0.000012612499,0.002582796],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980065,0.0009967574,0.00012596988,0.00022239932,0.00031493593,0.0003334673],"domain_scores_gemma":[0.9960238,0.0023562748,0.0004027234,0.000055453136,0.0009268537,0.00023486505],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004723484,0.0009950337,0.0006557017,0.0019288145,0.001178498,0.0036397718,0.0014101262,0.001536095,0.0025856982],"category_scores_gemma":[0.0068677515,0.00047209123,0.0008532928,0.0016642775,0.0005555069,0.0018025897,0.0016084005,0.0012918925,0.00034376263],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013592534,0.00022469109,0.011240798,0.00010064699,0.000045278794,0.00028024983,0.0007784955,0.9515228,0.00066015637,0.00933006,0.00073436135,0.024946572],"study_design_scores_gemma":[0.00000837469,0.000043839664,0.0009560954,0.000014708204,0.000012329888,0.0000134449765,0.00029038117,0.9970952,0.00011529357,0.0011393408,0.00030172468,0.000009314155],"about_ca_topic_score_codex":0.03372199,"about_ca_topic_score_gemma":0.01806513,"teacher_disagreement_score":0.03372199,"about_ca_system_score_codex":0.0040160264,"about_ca_system_score_gemma":0.004414556,"threshold_uncertainty_score":0.06705141},"labels":[],"label_agreement":null},{"id":"W4396225219","doi":"10.1177/87569728241251710","title":"Governance Framework Trajectory for Major Public Projects: The Case of Canada","year":2024,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Rimouski; HEC Montréal","funders":"","keywords":"Corporate governance; Field (mathematics); Novelty; TRACE (psycholinguistics); Project governance; Management science; Trajectory; Public policy; Political science; Public administration; Sociology; Process management; Business; Economics; Management; Law","score_opus":0.07881290098900659,"score_gpt":0.3526042064126833,"score_spread":0.2737913054236767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396225219","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89959776,0.00088944903,0.0071132784,0.006625842,0.00003841333,0.000267466,0.00093449996,0.000082519204,0.084450826],"genre_scores_gemma":[0.98682183,0.00034632537,0.0031645687,0.00010984397,0.0000027629706,0.000039648847,0.0002447112,0.000022119022,0.009248256],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.99598914,0.0010233035,0.00009967415,0.00030379783,0.0010557342,0.0015284274],"domain_scores_gemma":[0.9943447,0.0014083148,0.0004194361,0.00041141687,0.0021461667,0.0012699735],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002854655,0.00026684883,0.00029503615,0.0023183995,0.010410318,0.0069549014,0.0013826296,0.0012602487,0.0029075935],"category_scores_gemma":[0.008072222,0.00028524367,0.00031425426,0.0057047955,0.006198448,0.0017570783,0.0032096514,0.0014269134,0.00019823221],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026404456,0.00023928417,0.14788759,0.00035294166,0.000064423286,0.011365592,0.2579355,0.023475993,0.0039767255,0.37902206,0.01978248,0.15563335],"study_design_scores_gemma":[0.000042412797,0.00009776909,0.16965047,0.00060909346,0.000055289445,0.001320535,0.44459048,0.017903367,0.0020139632,0.023709588,0.33977607,0.00023100874],"about_ca_topic_score_codex":0.9840487,"about_ca_topic_score_gemma":0.99158937,"teacher_disagreement_score":0.11805886,"about_ca_system_score_codex":0.11805886,"about_ca_system_score_gemma":0.12014051,"threshold_uncertainty_score":0.856581},"labels":[],"label_agreement":null},{"id":"W4396631885","doi":"10.1016/j.autcon.2024.105450","title":"Employing simulation to assess value alignment and fulfillment within construction project settings and team dynamics","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Value (mathematics); Dynamics (music); Engineering; Computer science; Engineering management; Systems engineering; Process management; Operations management; Industrial engineering; Operations research; Psychology","score_opus":0.06667093756595338,"score_gpt":0.38580631707217367,"score_spread":0.3191353795062203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396631885","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9934662,0.0000089271525,0.004958279,0.00003425752,0.0000037176449,0.000038227958,0.000027411632,0.000019450312,0.0014435964],"genre_scores_gemma":[0.9976593,0.000007961314,0.0021004463,0.000004302407,7.419914e-7,0.000038742495,0.000030685183,0.0000023618338,0.0001553965],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989329,0.0006917567,0.000047650527,0.00007914622,0.00011783837,0.00013061406],"domain_scores_gemma":[0.9855693,0.012287382,0.00069277117,0.0004465519,0.0005444641,0.0004596447],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021246509,0.000404451,0.00035589738,0.0006033185,0.00062402524,0.0016833416,0.0005904611,0.0010495451,0.0012937328],"category_scores_gemma":[0.012439802,0.00028602523,0.00035470133,0.00075264997,0.00068334996,0.0008379335,0.00095076807,0.0007144922,0.00012180746],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014137756,0.0015871528,0.078407206,0.000065946304,0.00013382027,0.00014044106,0.0015632454,0.89563817,0.0024743502,0.0056588366,0.00027386117,0.012643103],"study_design_scores_gemma":[0.000054605083,0.0004643876,0.008976801,0.000011033302,0.000018195351,0.000019632498,0.0006488832,0.98674333,0.00079349184,0.0020304401,0.000223661,0.000015502868],"about_ca_topic_score_codex":0.013090465,"about_ca_topic_score_gemma":0.010958435,"teacher_disagreement_score":0.013090465,"about_ca_system_score_codex":0.0017465011,"about_ca_system_score_gemma":0.0021443416,"threshold_uncertainty_score":0.026028514},"labels":[],"label_agreement":null},{"id":"W4396954359","doi":"10.1080/09537287.2024.2352838","title":"Breaking the Sisyphean loop: reconceptualizing the treatment of risk and uncertainty in transport projects","year":2024,"lang":"en","type":"article","venue":"Production Planning & Control","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Loop (graph theory); Business; Political science; Environmental resource management; Environmental science; Mathematics","score_opus":0.07465474605555084,"score_gpt":0.3453562040005853,"score_spread":0.2707014579450345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396954359","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031740036,0.008628104,0.8062506,0.11365157,0.0012696492,0.00021595525,0.00016815981,0.00034420032,0.037731763],"genre_scores_gemma":[0.6871987,0.007000049,0.2938536,0.0063855303,0.0009806041,0.0005597628,0.0001255099,0.00048340845,0.0034128176],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9362733,0.049283694,0.0020206927,0.0025156564,0.0082585085,0.0016480975],"domain_scores_gemma":[0.9386664,0.043570466,0.0037746823,0.0071185105,0.005444113,0.0014258006],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.055887517,0.001900588,0.0020350958,0.007826798,0.0065956493,0.019086549,0.00584404,0.007286176,0.0037675714],"category_scores_gemma":[0.11454928,0.0013580777,0.0018262098,0.0062920507,0.06961722,0.04503901,0.01903467,0.011398817,0.00051480986],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048897065,0.00004124624,0.0007421411,0.00023605568,0.000058792935,0.000072961055,0.0097405305,0.01588339,0.00020279665,0.9242313,0.002077533,0.046664394],"study_design_scores_gemma":[0.000013314459,0.000025820698,0.00025496611,0.00036826212,0.000020915124,0.000033901913,0.002763813,0.009643031,0.0002877115,0.9692266,0.017318005,0.000043741027],"about_ca_topic_score_codex":0.012026911,"about_ca_topic_score_gemma":0.012787443,"teacher_disagreement_score":0.055887517,"about_ca_system_score_codex":0.014844216,"about_ca_system_score_gemma":0.035689346,"threshold_uncertainty_score":0.295565},"labels":[],"label_agreement":null},{"id":"W4399030671","doi":"10.29007/kf4x","title":"Do Greater Qualifications Imply Higher Bid Costs?","year":2024,"lang":"en","type":"article","venue":"EPiC series in built environment","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Procurement; Business; Construction industry; National best bid and offer; Process (computing); Rank (graph theory); Operations management; Engineering management; Actuarial science; Computer science; Operations research; Marketing; Economics; Engineering; Finance; Construction engineering; Mathematics","score_opus":0.10862782953225009,"score_gpt":0.37103683512254476,"score_spread":0.2624090055902947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399030671","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9730762,0.0003951799,0.0039300495,0.002180173,0.000058153477,0.00005000766,0.00038455782,0.000020012803,0.019905703],"genre_scores_gemma":[0.9990042,0.000053320724,0.0003085753,0.00008890911,0.000018640967,0.000012812151,0.00006819226,0.000005778024,0.0004396064],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98701674,0.005735584,0.0013507865,0.00095274294,0.0030053915,0.0019387479],"domain_scores_gemma":[0.805491,0.10089877,0.07007439,0.004945897,0.009029711,0.009560251],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00911182,0.00024223469,0.00046161885,0.0019715587,0.0009322735,0.0028657848,0.000663544,0.0012216414,0.016329348],"category_scores_gemma":[0.11977696,0.0002690186,0.00037037884,0.0029370387,0.0029101726,0.0034098173,0.001821613,0.0011166092,0.0015517244],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005423104,0.0003151498,0.9300163,0.00022977282,0.00004987269,0.00057768024,0.004993985,0.0008248275,0.0005743518,0.0130909,0.0015114213,0.04727349],"study_design_scores_gemma":[0.000019273379,0.00020964564,0.9807715,0.00010056356,0.000015228114,0.00036177656,0.008051306,0.0005164594,0.00018794918,0.0071722777,0.0025675755,0.000026455618],"about_ca_topic_score_codex":0.004181835,"about_ca_topic_score_gemma":0.0031300206,"teacher_disagreement_score":0.016329348,"about_ca_system_score_codex":0.0016915689,"about_ca_system_score_gemma":0.0018780705,"threshold_uncertainty_score":0.05462712},"labels":[],"label_agreement":null},{"id":"W4399340593","doi":"10.1201/9781003379553-7","title":"The Construction Commons","year":2024,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Commons; Computer science; Political science; Law","score_opus":0.09663588502689675,"score_gpt":0.3479049772736631,"score_spread":0.25126909224676636,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399340593","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020715722,0.0064293495,0.022561135,0.008067926,0.0006843906,0.00006249226,0.000108121414,0.00011130616,0.9599037],"genre_scores_gemma":[0.23181787,0.017086558,0.018929359,0.006291562,0.001089642,0.00043735869,0.0005078847,0.00043618237,0.7234036],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99861777,0.00039503362,0.000049079223,0.0002660188,0.00048009586,0.00019197307],"domain_scores_gemma":[0.99910057,0.00043363258,0.000053586013,0.0002092207,0.000118049276,0.00008502576],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001254705,0.0005577809,0.0004172386,0.0013429149,0.0039884765,0.007576979,0.0013999189,0.0027272666,0.026857164],"category_scores_gemma":[0.0021415865,0.00032164867,0.00045240577,0.0017030824,0.01714826,0.008060787,0.0049709007,0.0033561573,0.0053369976],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010414743,0.0000022940912,0.00001692287,0.000015893716,3.83515e-7,0.000011367699,0.00038074245,0.00010079511,0.000021988784,0.9877415,0.0064990395,0.005207941],"study_design_scores_gemma":[0.000001112503,0.0000032608098,0.000058728925,0.000101489975,7.3780615e-7,0.00006286134,0.0003958325,0.00019129593,0.00006538079,0.31860635,0.6805092,0.0000037217287],"about_ca_topic_score_codex":0.006456533,"about_ca_topic_score_gemma":0.008390076,"teacher_disagreement_score":0.026857164,"about_ca_system_score_codex":0.0069097974,"about_ca_system_score_gemma":0.0055295895,"threshold_uncertainty_score":0.089846194},"labels":[],"label_agreement":null},{"id":"W4399397033","doi":"10.1061/aomjah.aoeng-0033","title":"Balancing Environmental and Economic Objectives for In-Stream Construction Projects: A Case Study on Sediment Management","year":2024,"lang":"en","type":"article","venue":"ASCE OPEN Multidisciplinary Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia; Okanagan College","funders":"","keywords":"Sediment; Business; Environmental resource management; Environmental science; Environmental planning; Natural resource economics; Geology; Economics","score_opus":0.03622949734170571,"score_gpt":0.34037390703648773,"score_spread":0.304144409694782,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399397033","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9924206,0.00006126505,0.0027185616,0.00022034299,0.0000056609833,0.00023953684,0.000054413296,0.000017565706,0.0042619365],"genre_scores_gemma":[0.9848962,0.0002187848,0.011325332,0.00004314452,0.000009126715,0.00012174724,0.00006614095,0.0000144390115,0.0033050454],"study_design_codex":"observational","study_design_gemma":"case_report","domain_scores_codex":[0.99770325,0.0010703338,0.00007671323,0.00012703091,0.0005150526,0.0005076079],"domain_scores_gemma":[0.9963877,0.0017662823,0.0004358783,0.00016928607,0.00062124326,0.0006195996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029478958,0.0008166996,0.00040209576,0.0009483331,0.0040176343,0.002401796,0.0016045375,0.0018581863,0.0013290239],"category_scores_gemma":[0.0040739086,0.00033344817,0.00046654043,0.001714174,0.0012186511,0.00086313195,0.0009946912,0.0011044913,0.00013662106],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017577392,0.014464408,0.35099596,0.0010179938,0.00030498876,0.037796203,0.022360437,0.31871036,0.028356662,0.016275363,0.006820625,0.20113929],"study_design_scores_gemma":[0.00080571417,0.016374994,0.402692,0.00043707227,0.00042499512,0.0056827455,0.12720752,0.35854784,0.03410758,0.006591358,0.046750218,0.00037799022],"about_ca_topic_score_codex":0.07890713,"about_ca_topic_score_gemma":0.26895106,"teacher_disagreement_score":0.07890713,"about_ca_system_score_codex":0.006714499,"about_ca_system_score_gemma":0.006565907,"threshold_uncertainty_score":0.1568957},"labels":[],"label_agreement":null},{"id":"W4399409628","doi":"10.1007/978-3-031-56988-3_12","title":"Preliminary Conclusions","year":2024,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Calgary Laboratory Services","funders":"","keywords":"Computer science","score_opus":0.10996974048637638,"score_gpt":0.36641311347847494,"score_spread":0.2564433729920986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399409628","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003032675,0.0009195583,0.009527045,0.025184985,0.004869444,0.00026067195,0.005563209,0.000790077,0.9498524],"genre_scores_gemma":[0.03655211,0.0010862357,0.0065436936,0.01002115,0.0012284458,0.0002863361,0.0048346715,0.00046947852,0.9389778],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983449,0.00031954888,0.00005907617,0.0003491904,0.0006635784,0.00026375774],"domain_scores_gemma":[0.9949007,0.0009923131,0.00012494376,0.0008550257,0.0026362594,0.0004907432],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0024303498,0.00073716266,0.00046918934,0.0014270514,0.0016539493,0.0046606874,0.0014257127,0.001652841,0.4787215],"category_scores_gemma":[0.010654461,0.00023631532,0.0010034341,0.0011394655,0.0008162522,0.0023589064,0.0016988185,0.0016597852,0.17666318],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003419354,0.00009420296,0.00090265746,0.00032618482,0.00002216907,0.00009762097,0.0003908762,0.00082305947,0.0014699183,0.14189444,0.7408137,0.11282329],"study_design_scores_gemma":[0.000047610352,0.000052327658,0.002783584,0.00021777631,0.000028425156,0.00006277463,0.0009823462,0.000495165,0.0018611796,0.052695077,0.94075525,0.000018528115],"about_ca_topic_score_codex":0.012302357,"about_ca_topic_score_gemma":0.01308177,"teacher_disagreement_score":0.4787215,"about_ca_system_score_codex":0.0027127143,"about_ca_system_score_gemma":0.002787578,"threshold_uncertainty_score":0.7435405},"labels":[],"label_agreement":null},{"id":"W4399413427","doi":"10.1007/978-3-031-56988-3_10","title":"Systems Dynamics and Project Rework Cycle Model","year":2024,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Calgary Laboratory Services","funders":"","keywords":"Rework; System dynamics; Dynamics (music); Computer science; Systems engineering; Engineering; Physics; Embedded system; Artificial intelligence","score_opus":0.08924864775027008,"score_gpt":0.34712157732356125,"score_spread":0.25787292957329117,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399413427","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022117162,0.0025414051,0.551579,0.0031093438,0.00036606513,0.00011238246,0.00066149863,0.00030437572,0.41920877],"genre_scores_gemma":[0.58290774,0.0048471563,0.047417816,0.00036556672,0.00016370905,0.00039421255,0.0006473177,0.0002601608,0.3629964],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998455,0.000045107106,0.000004780501,0.000030162797,0.000057796067,0.000016675549],"domain_scores_gemma":[0.99985695,0.00007408589,0.000011834584,0.000015187649,0.00003257764,0.000009371378],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002687415,0.0005028392,0.00034876532,0.0005189775,0.00035851216,0.001188404,0.0009756767,0.00080576143,0.01362418],"category_scores_gemma":[0.00073134375,0.0002711926,0.00044839852,0.00069805875,0.000609958,0.0015674647,0.0006013844,0.0009924793,0.0015262892],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000074611953,0.000020930309,0.00021194032,0.00005801541,0.000009360435,0.00005590771,0.00009715428,0.20063488,0.00039988654,0.7659686,0.008087405,0.024448503],"study_design_scores_gemma":[0.0000063863695,0.000018150771,0.00033773313,0.00003615586,0.000008349597,0.000067730594,0.00009541821,0.3852968,0.00036615095,0.5708212,0.042930502,0.000015490674],"about_ca_topic_score_codex":0.006024415,"about_ca_topic_score_gemma":0.0037226866,"teacher_disagreement_score":0.01362418,"about_ca_system_score_codex":0.0014283342,"about_ca_system_score_gemma":0.00093094155,"threshold_uncertainty_score":0.045577466},"labels":[],"label_agreement":null},{"id":"W4399416990","doi":"10.1007/978-3-031-56988-3_5","title":"Phenomenological Methods","year":2024,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Calgary Laboratory Services","funders":"","keywords":"Psychology; Philosophy; Epistemology","score_opus":0.3027306726816189,"score_gpt":0.48478553975680905,"score_spread":0.18205486707519014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399416990","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028448345,0.0019357384,0.2767932,0.0023393082,0.00071114104,0.0019179434,0.0009745096,0.0003081297,0.7121752],"genre_scores_gemma":[0.22349077,0.0047825626,0.3117414,0.0025824055,0.0004382605,0.011998671,0.0016453274,0.0008338817,0.44248673],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99155337,0.0057236175,0.000332493,0.0008038841,0.0012755805,0.00031112964],"domain_scores_gemma":[0.9909802,0.006038993,0.00022681335,0.0016015876,0.00096155395,0.00019070695],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008732657,0.0011675095,0.00067771366,0.004507477,0.004628593,0.0074831657,0.0022808576,0.001609099,0.08070939],"category_scores_gemma":[0.0152758695,0.0006594418,0.0009998416,0.0032863505,0.009439736,0.0060840496,0.0059341146,0.002603184,0.013264916],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024979941,0.000034004708,0.00016401077,0.00049717154,0.000010325907,0.00004483843,0.012450466,0.0002871432,0.00027203004,0.8974289,0.014420772,0.074365325],"study_design_scores_gemma":[0.00003195679,0.000025609625,0.0004357755,0.00072860654,0.00001775816,0.00019841203,0.018277835,0.0010240052,0.0007708116,0.49141872,0.48704353,0.00002705749],"about_ca_topic_score_codex":0.0028765749,"about_ca_topic_score_gemma":0.0038854766,"teacher_disagreement_score":0.08070939,"about_ca_system_score_codex":0.0036608987,"about_ca_system_score_gemma":0.0042435313,"threshold_uncertainty_score":0.26999986},"labels":[],"label_agreement":null},{"id":"W4399587870","doi":"10.1177/00208523241258214","title":"Organizational learning capacity and international development project success in West Africa: A case study","year":2024,"lang":"en","type":"article","venue":"International Review of Administrative Sciences","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa; Université du Québec à Chicoutimi; Université du Québec; Desjardins","funders":"","keywords":"Organization development; Critical success factor; Organizational learning; Knowledge management; Business; OPM3; Action learning; Autonomy; Public relations; Project management; Process management; Management; Political science; Project management triangle; Sociology; Cooperative learning; Computer science; Economics; Pedagogy","score_opus":0.28992458136353133,"score_gpt":0.4823677817771789,"score_spread":0.19244320041364754,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399587870","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99602735,0.00024380953,0.00049229746,0.00019828872,0.0000030733852,0.0001093976,0.0000205523,0.0000017556451,0.002903403],"genre_scores_gemma":[0.9971745,0.0008738881,0.0008609828,0.000036168854,0.00000512602,0.00015365674,0.000016210908,0.000002330655,0.0008771875],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9971871,0.0018292025,0.00010975167,0.00011058926,0.00019168011,0.00057181064],"domain_scores_gemma":[0.9947162,0.0030647272,0.0009290649,0.00018926921,0.0003083431,0.0007924184],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040747,0.00053994,0.0003978166,0.0020264506,0.0048320005,0.002558347,0.0007640623,0.0010209422,0.0020260264],"category_scores_gemma":[0.0053466223,0.00039966733,0.00026498336,0.0025576793,0.0022525373,0.0019351495,0.0029931462,0.0011131061,0.00018008724],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046759922,0.0054242928,0.23942456,0.0011295372,0.00007110609,0.042491857,0.5924158,0.0014112983,0.0026088564,0.013472378,0.001954134,0.09912866],"study_design_scores_gemma":[0.000067599285,0.0017698266,0.12148512,0.0009384126,0.000096594194,0.010238404,0.8348331,0.0015238231,0.002514186,0.0016703745,0.024803875,0.000058693367],"about_ca_topic_score_codex":0.0059330235,"about_ca_topic_score_gemma":0.009990779,"teacher_disagreement_score":0.0059330235,"about_ca_system_score_codex":0.0024511686,"about_ca_system_score_gemma":0.0019555013,"threshold_uncertainty_score":0.021549344},"labels":[],"label_agreement":null},{"id":"W4399685726","doi":"10.5267/j.jpm.2024.4.001","title":"Does risk management components influence on project success? Evidence from IT sector ,","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Risk management; Risk analysis (engineering); Process management; Knowledge management; Computer science; Finance","score_opus":0.10543946744118546,"score_gpt":0.39281216922399254,"score_spread":0.28737270178280705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399685726","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98500896,0.0036731348,0.0011352295,0.00096737617,0.000013669983,0.000060670154,0.00005905221,0.000009543513,0.009072375],"genre_scores_gemma":[0.9977702,0.0014233254,0.00039235796,0.000063322215,0.000008516179,0.00002473911,0.000025738052,0.000005957329,0.00028578806],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9817332,0.01105397,0.0012285804,0.0011142506,0.0041146614,0.0007552076],"domain_scores_gemma":[0.6636638,0.25849935,0.059044264,0.005219452,0.008045352,0.0055278228],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013947359,0.00035923335,0.0004460674,0.002204731,0.00074116007,0.0029417817,0.0009176767,0.0009473748,0.0061169486],"category_scores_gemma":[0.11038808,0.00041568335,0.00085708604,0.0019387926,0.002012515,0.0025642079,0.0019132429,0.0012309989,0.00047744933],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007416976,0.0010121542,0.88472867,0.0013620612,0.00080587144,0.0003229974,0.013201879,0.00046396087,0.0003728688,0.0033195298,0.00050016557,0.093168214],"study_design_scores_gemma":[0.00003122269,0.0006908818,0.98235196,0.0012542215,0.00040293037,0.00027550053,0.009477641,0.0006302483,0.00035978798,0.0015292964,0.002964292,0.000031915566],"about_ca_topic_score_codex":0.0026977165,"about_ca_topic_score_gemma":0.0031654313,"teacher_disagreement_score":0.013947359,"about_ca_system_score_codex":0.0011017885,"about_ca_system_score_gemma":0.0027004005,"threshold_uncertainty_score":0.07376152},"labels":[],"label_agreement":null},{"id":"W4399686298","doi":"10.5267/j.jpm.2024.4.004","title":"Investigating the impact of lean construction principles on contractors’ project performance in Ethiopia using PLS-SEM","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Engineering; Construction engineering; Process management; Operations management","score_opus":0.18625872961082338,"score_gpt":0.4258892228710137,"score_spread":0.23963049326019034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399686298","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99635184,0.000022736494,0.0019828978,0.000040259394,0.0000017906932,0.000046995425,0.00009131961,0.0000047624662,0.0014574202],"genre_scores_gemma":[0.99578494,0.000051518786,0.0036154022,0.000012789219,0.0000010523481,0.00004771334,0.00006223278,0.0000030127617,0.00042130053],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9959915,0.0026544335,0.00021502891,0.0002587251,0.0005852901,0.00029493732],"domain_scores_gemma":[0.9926755,0.0046659727,0.0007996268,0.00028704514,0.0013776117,0.00019421482],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00852126,0.0004067522,0.00026663623,0.0011699621,0.00074895914,0.0016047957,0.00037114616,0.00022827607,0.0013857373],"category_scores_gemma":[0.007863549,0.000286109,0.0003454417,0.0018023365,0.0007197264,0.00070403423,0.00083468296,0.0004144425,0.00014197665],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00071301043,0.0010365311,0.76546204,0.00054213183,0.00028159164,0.0005805663,0.03195328,0.03636733,0.006905029,0.005381795,0.0010392807,0.14973752],"study_design_scores_gemma":[0.00009135312,0.001670655,0.7456865,0.00042593793,0.00025304142,0.00025374416,0.13968004,0.08540832,0.014718401,0.0029581748,0.008700817,0.00015307481],"about_ca_topic_score_codex":0.006600112,"about_ca_topic_score_gemma":0.008426955,"teacher_disagreement_score":0.00852126,"about_ca_system_score_codex":0.0016811482,"about_ca_system_score_gemma":0.0028800743,"threshold_uncertainty_score":0.045065284},"labels":[],"label_agreement":null},{"id":"W4399686401","doi":"10.5267/j.jpm.2024.5.003","title":"Critical success factors affecting project success in construction projects: A contemporary Indian perspective","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Perspective (graphical); Critical success factor; Construction engineering; Architectural engineering; Engineering; Process management; Business; Computer science; Artificial intelligence","score_opus":0.10769226548919722,"score_gpt":0.4236981949898596,"score_spread":0.3160059295006624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399686401","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96568465,0.0023392166,0.0031318164,0.0033791394,0.00003258857,0.00008309285,0.00008229068,0.000035616733,0.025231611],"genre_scores_gemma":[0.99793017,0.0010636392,0.0005579891,0.000044906334,0.000010306032,0.00001658,0.000015773712,0.0000070051046,0.0003535365],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99516726,0.0016380929,0.00027769542,0.00026859698,0.0015152094,0.0011331252],"domain_scores_gemma":[0.98374444,0.0074979165,0.0036620996,0.00033537025,0.0025785314,0.0021816257],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004251174,0.0006218502,0.00036046375,0.00592532,0.0042689517,0.0076372465,0.0010285949,0.00080520456,0.002117353],"category_scores_gemma":[0.010859819,0.0005010267,0.00045446688,0.0063001565,0.0077436566,0.002374153,0.0037092487,0.0017332401,0.00026616073],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024023138,0.00047221905,0.50404733,0.0014825803,0.00014793877,0.004649146,0.23416568,0.0034203683,0.003053323,0.04268485,0.0051230085,0.20051332],"study_design_scores_gemma":[0.000008888931,0.00025282672,0.61113405,0.001037546,0.00012675724,0.0021475407,0.34133723,0.0023396313,0.0013443242,0.012630753,0.027468821,0.00017158303],"about_ca_topic_score_codex":0.02440695,"about_ca_topic_score_gemma":0.023378363,"teacher_disagreement_score":0.02440695,"about_ca_system_score_codex":0.0060869623,"about_ca_system_score_gemma":0.0092482045,"threshold_uncertainty_score":0.048529744},"labels":[],"label_agreement":null},{"id":"W4400235017","doi":"10.11159/iccste24.238","title":"Quantifying the Monetary Impact of Schedule and Cost Risks in Construction Projects","year":2024,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Schedule; Computer science; Reliability engineering; Engineering; Operating system","score_opus":0.09964196510719714,"score_gpt":0.34856633506432194,"score_spread":0.2489243699571248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400235017","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90487474,0.0009771386,0.07404791,0.00032706722,0.000044609777,0.00056380744,0.0006723088,0.00015546067,0.018336887],"genre_scores_gemma":[0.97756964,0.00046891707,0.020520763,0.000013861101,0.000013332685,0.00015306413,0.000240064,0.000021113336,0.0009993619],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9906183,0.0046803043,0.00053994876,0.00030161891,0.0035420128,0.0003178278],"domain_scores_gemma":[0.96471936,0.02572284,0.005063092,0.0007589501,0.0032454398,0.0004902805],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007609747,0.0008819918,0.00038786547,0.0043314896,0.00046373095,0.0023061046,0.00063791004,0.0006804201,0.001198888],"category_scores_gemma":[0.03390952,0.00036325504,0.00053724926,0.0027765078,0.0005269505,0.0019859928,0.0013266696,0.00059490703,0.00013896715],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000717058,0.00046574255,0.12119108,0.00052952504,0.00028375073,0.00052519154,0.0007882747,0.6826053,0.005552559,0.009194454,0.0010245979,0.17712249],"study_design_scores_gemma":[0.000041764342,0.002685854,0.2044971,0.0002802948,0.00029800032,0.0005077575,0.0029122878,0.75927466,0.0098945135,0.014987874,0.00441809,0.00020173383],"about_ca_topic_score_codex":0.0051192003,"about_ca_topic_score_gemma":0.0058031017,"teacher_disagreement_score":0.007609747,"about_ca_system_score_codex":0.0026181915,"about_ca_system_score_gemma":0.0020766498,"threshold_uncertainty_score":0.04024464},"labels":[],"label_agreement":null},{"id":"W4400235412","doi":"10.11159/iccste24.157","title":"Synergising Lifecycle Project Management for Sustainability: Towards a Streamlined Approach through different Project Phases","year":2024,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Technische Universität Dresden","keywords":"Sustainability; Process management; Application lifecycle management; Project management; System lifecycle; Computer science; Business; Knowledge management; Systems engineering; Engineering; Software","score_opus":0.055330041015145215,"score_gpt":0.33309943446511564,"score_spread":0.2777693934499704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400235412","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.107073456,0.00073617144,0.8709404,0.0025023785,0.00007274397,0.0008013773,0.00012572615,0.0007293218,0.01701843],"genre_scores_gemma":[0.4626465,0.000468156,0.5339247,0.0001500751,0.000034428802,0.00030690257,0.00017684215,0.000110514375,0.0021818366],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9913061,0.0045272075,0.0004915894,0.0006233029,0.0024599102,0.0005919084],"domain_scores_gemma":[0.9932199,0.0022594673,0.001397798,0.0009887754,0.0016010236,0.0005329925],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009278654,0.0008060014,0.0006721539,0.0027547993,0.0009572575,0.0055986787,0.0014040358,0.0015107135,0.002351666],"category_scores_gemma":[0.011357382,0.0007303875,0.00070801703,0.0021850034,0.0010839646,0.0068852776,0.004767709,0.0016621961,0.00075024215],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022234886,0.0012564645,0.015580732,0.00064823293,0.00014438893,0.00017173105,0.0020871891,0.05545284,0.020079732,0.039947692,0.0023862706,0.8620223],"study_design_scores_gemma":[0.00022126792,0.0026268086,0.03807077,0.0020042742,0.00046978556,0.000802403,0.012201969,0.5310705,0.047437306,0.283167,0.081614524,0.00031347183],"about_ca_topic_score_codex":0.0010758615,"about_ca_topic_score_gemma":0.0027225746,"teacher_disagreement_score":0.009278654,"about_ca_system_score_codex":0.0014819864,"about_ca_system_score_gemma":0.0074546114,"threshold_uncertainty_score":0.049070776},"labels":[],"label_agreement":null},{"id":"W4400439956","doi":"10.5465/amproc.2024.20645symposium","title":"DEI Practices in Organizations: Effectiveness, Impact, and Unintended Consequences","year":2024,"lang":"en","type":"article","venue":"Academy of Management Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary; Simon Fraser University; University of Toronto","funders":"","keywords":"Unintended consequences; Business; Knowledge management; Process management; Political science; Computer science","score_opus":0.08109935749476099,"score_gpt":0.4241794737850566,"score_spread":0.3430801162902956,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400439956","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8240083,0.021054056,0.00446707,0.05263636,0.00077779987,0.00024834575,0.00013971807,0.00013856639,0.09652984],"genre_scores_gemma":[0.98534274,0.0074446043,0.0019633896,0.0018663189,0.00020564758,0.00014853716,0.000045680183,0.000021401338,0.0029617136],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9412754,0.03622047,0.0029343953,0.0018205146,0.012959228,0.004789963],"domain_scores_gemma":[0.86597574,0.07828911,0.023072803,0.011313586,0.012930672,0.008418038],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03908404,0.0005914766,0.000604089,0.0029529543,0.0051626717,0.0077125174,0.002152653,0.002475305,0.0030669093],"category_scores_gemma":[0.07870057,0.00040100922,0.00064784416,0.0026324212,0.0055623185,0.0055833817,0.011524677,0.0025613143,0.0005127271],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026508048,0.003620763,0.19796628,0.0011615484,0.00022925933,0.00047006566,0.06483798,0.0010909599,0.0010823115,0.033899512,0.0074118865,0.68796444],"study_design_scores_gemma":[0.00017557637,0.0054609114,0.33363792,0.0073980293,0.0003323877,0.0014606081,0.42485967,0.0035012248,0.0054237084,0.057888214,0.15965988,0.0002017596],"about_ca_topic_score_codex":0.0042540315,"about_ca_topic_score_gemma":0.00622651,"teacher_disagreement_score":0.03908404,"about_ca_system_score_codex":0.0060065757,"about_ca_system_score_gemma":0.0058169807,"threshold_uncertainty_score":0.2066986},"labels":[],"label_agreement":null},{"id":"W4401012248","doi":"10.1007/s41062-024-01625-z","title":"Governance practices of large construction projects","year":2024,"lang":"en","type":"article","venue":"Innovative Infrastructure Solutions","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Corporate governance; Accountability; Process management; Context (archaeology); Stakeholder; Process (computing); Business; Project governance; Project management; Critical success factor; Engineering; Knowledge management; Computer science; Public relations; Political science; Systems engineering; Geography; Finance","score_opus":0.0804652672205189,"score_gpt":0.3991796127712938,"score_spread":0.31871434555077494,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401012248","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97617155,0.00020048254,0.0029128685,0.0009794888,0.0000069081198,0.00007067907,0.000049849492,0.000023238943,0.01958496],"genre_scores_gemma":[0.99807525,0.000070515816,0.0005317939,0.000023679766,0.0000021671442,0.000015755768,0.000015903772,0.0000054630077,0.0012594778],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9912685,0.00597717,0.00034911602,0.0005636113,0.00093841105,0.00090329413],"domain_scores_gemma":[0.9817923,0.008724898,0.003400404,0.0018676602,0.0021911673,0.0020235514],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0068335407,0.000102617676,0.0001416917,0.0019392734,0.0021094268,0.0046214876,0.00046581635,0.00064383866,0.0015555893],"category_scores_gemma":[0.021598367,0.00025016814,0.00010750312,0.002804964,0.0026606342,0.0016183717,0.0026438334,0.00071493257,0.00017219664],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024123555,0.0003768655,0.36549905,0.0002471806,0.000086934204,0.0010569071,0.24800727,0.00849776,0.0054335566,0.13491784,0.005761035,0.2298744],"study_design_scores_gemma":[0.000038960836,0.00039816753,0.6580285,0.00042429604,0.000037041886,0.00047071744,0.2162147,0.008246382,0.001749619,0.032471932,0.08181993,0.00009973012],"about_ca_topic_score_codex":0.012227779,"about_ca_topic_score_gemma":0.027641498,"teacher_disagreement_score":0.012227779,"about_ca_system_score_codex":0.0051327837,"about_ca_system_score_gemma":0.005290661,"threshold_uncertainty_score":0.0372411},"labels":[],"label_agreement":null},{"id":"W4401133482","doi":"10.17576/jkukm-2024-36(4)-01","title":"Unraveling the Phenomenon of Construction Labor Productivity: A Cutting-Edge Bibliometric Analysis","year":2024,"lang":"en","type":"article","venue":"Jurnal Kejuruteraan","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Computer science; Scopus; Thematic analysis; Identification (biology); Metadata; Data science; Knowledge management; Qualitative research; World Wide Web; Political science; Social science; Sociology","score_opus":0.0664493990397535,"score_gpt":0.36798559763746647,"score_spread":0.30153619859771297,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401133482","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66655236,0.09613978,0.051973984,0.01325212,0.0006915461,0.002931928,0.026186207,0.0006612639,0.14161088],"genre_scores_gemma":[0.8940814,0.046130173,0.04320967,0.0004785026,0.00038267943,0.001351536,0.010530442,0.00010705916,0.0037285644],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9846407,0.003367888,0.003187003,0.00075335306,0.007550347,0.0005006043],"domain_scores_gemma":[0.9414178,0.036687557,0.0065288567,0.002242509,0.012434265,0.0006889572],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.017570166,0.0005348667,0.0015528788,0.19535898,0.0019436548,0.00993314,0.0010606535,0.0007660547,0.002475159],"category_scores_gemma":[0.0544449,0.00030252084,0.0012267242,0.19312897,0.0018945778,0.0074221487,0.004675154,0.0006470907,0.00047115795],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001627284,0.00015889514,0.21057981,0.036265314,0.0010865971,0.001323945,0.035970766,0.0017823759,0.0049177553,0.060063373,0.01744866,0.63023984],"study_design_scores_gemma":[0.00003717137,0.00031397116,0.5324919,0.0227952,0.002353282,0.0025938603,0.10026781,0.007152553,0.006236769,0.04087897,0.28456682,0.00031167667],"about_ca_topic_score_codex":0.0063813264,"about_ca_topic_score_gemma":0.010436204,"teacher_disagreement_score":0.804641,"about_ca_system_score_codex":0.0040890696,"about_ca_system_score_gemma":0.009937474,"threshold_uncertainty_score":0.09292102},"labels":[],"label_agreement":null},{"id":"W4401324212","doi":"10.31224/3837","title":"Designing a Collaborative Algorithm for Performance Evaluation of Construction Companies, using Content analysis","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Leverage (statistics); Computer science; Reliability (semiconductor); Rank (graph theory); Content analysis; Process management; Data mining; Engineering; Machine learning; Mathematics","score_opus":0.3629066144669747,"score_gpt":0.4416612588400544,"score_spread":0.07875464437307972,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401324212","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00529149,0.000027430846,0.99329257,0.000055497723,0.000008896715,0.00022272354,0.000022520271,0.00037463,0.00070434244],"genre_scores_gemma":[0.06517463,0.000037530688,0.93356687,0.00002319883,0.00001279946,0.0006682372,0.000118396034,0.00007455595,0.00032377013],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98176056,0.009116653,0.0014514072,0.0024210017,0.0046401825,0.00061023544],"domain_scores_gemma":[0.971116,0.017529808,0.0024464063,0.0019027519,0.006583616,0.0004213998],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019604385,0.0018279785,0.001899116,0.00878018,0.0020367564,0.0050373394,0.0022529252,0.0020128903,0.0028607517],"category_scores_gemma":[0.05830527,0.000987448,0.0014932019,0.004131099,0.0017247677,0.004790941,0.003042379,0.0013866376,0.0011418327],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030225725,0.0005606543,0.008375307,0.00052615255,0.00026873063,0.00011143802,0.0018830294,0.23063402,0.008566578,0.03143919,0.0030857127,0.7142469],"study_design_scores_gemma":[0.00007825887,0.00022010853,0.0011505344,0.00008132304,0.000056157467,0.00006876988,0.00044538645,0.96904176,0.0059316345,0.019686094,0.003192686,0.00004738675],"about_ca_topic_score_codex":0.004150987,"about_ca_topic_score_gemma":0.0026501555,"teacher_disagreement_score":0.019604385,"about_ca_system_score_codex":0.0030588924,"about_ca_system_score_gemma":0.004066658,"threshold_uncertainty_score":0.10367912},"labels":[],"label_agreement":null},{"id":"W4401390503","doi":"10.59876/a-6m4n-vyx0","title":"Perceptions de la complexité chez les acteurs de projet : une étude exploratoire internationale par les situations managériales","year":2024,"lang":"en","type":"article","venue":"Management international","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Typology; Coaching; Perception; Sociology; Psychology; Computer science","score_opus":0.1078784631270358,"score_gpt":0.37706583898681884,"score_spread":0.26918737585978303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401390503","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9977077,0.00013348051,0.0012530233,0.00007081434,0.0000035103262,0.000018688677,0.000011341548,0.0000029761425,0.0007982501],"genre_scores_gemma":[0.99868804,0.00023474796,0.0005276575,0.000021267793,0.0000054636466,0.0000374861,0.000013568436,0.0000025774987,0.00046919222],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99211454,0.0052926894,0.0003280605,0.0005172585,0.0013064804,0.00044088232],"domain_scores_gemma":[0.9844662,0.010423412,0.0024558406,0.00036087038,0.00131979,0.00097389985],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009152327,0.0006072246,0.0003744401,0.0017173772,0.001877664,0.004019081,0.00038977366,0.0011551116,0.00140801],"category_scores_gemma":[0.019323291,0.0005349151,0.00043143673,0.0010996866,0.002646649,0.0024602672,0.0022628026,0.0017451191,0.00017247204],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031477466,0.00066563074,0.3058259,0.00026853883,0.00009640734,0.0011553859,0.6244993,0.0009449313,0.0065364465,0.002448093,0.00034604108,0.05689858],"study_design_scores_gemma":[0.000024892071,0.0011309837,0.44407427,0.00016843276,0.00004002896,0.0013272316,0.54177374,0.0016047837,0.0016436457,0.0007613833,0.0073597324,0.00009084577],"about_ca_topic_score_codex":0.0069214692,"about_ca_topic_score_gemma":0.006176577,"teacher_disagreement_score":0.009152327,"about_ca_system_score_codex":0.0014869091,"about_ca_system_score_gemma":0.0013828019,"threshold_uncertainty_score":0.048402667},"labels":[],"label_agreement":null},{"id":"W4401805150","doi":"10.1057/978-1-349-96110-8_4117","title":"Engineers Canada","year":2024,"lang":"en","type":"book-chapter","venue":"Palgrave Macmillan UK eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Political science","score_opus":0.04105385061487004,"score_gpt":0.2781851980003564,"score_spread":0.23713134738548636,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401805150","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00037982545,0.0018297151,0.00079510844,0.0012583401,0.00064482447,0.000042864973,0.0023105426,0.0003886956,0.99235004],"genre_scores_gemma":[0.00052551914,0.0004176025,0.0002006327,0.00011309757,0.000013480258,0.000008939969,0.000375322,0.00007603555,0.9982693],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99857116,0.000070391165,0.000039863437,0.00027877706,0.0008348885,0.00020485105],"domain_scores_gemma":[0.9983187,0.00016218903,0.000043974822,0.00017130215,0.0010857033,0.00021808191],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0005430984,0.0018993781,0.00083562796,0.0024558497,0.0049052895,0.006913951,0.0013598191,0.0023823243,0.6814721],"category_scores_gemma":[0.002012989,0.0008779195,0.0006040242,0.004064241,0.00092282315,0.002269162,0.002301462,0.002204855,0.49563736],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004945328,0.000034158333,0.00034682735,0.00018121356,0.0000055827763,0.00019541307,0.00017888556,0.00030235376,0.0007771183,0.021868767,0.78491724,0.19114302],"study_design_scores_gemma":[0.0000027714848,0.0000037187608,0.00016997581,0.00003548529,0.0000014232327,0.000029527679,0.00006859389,0.000050033785,0.00012372986,0.0006285592,0.99888295,0.000003277163],"about_ca_topic_score_codex":0.35624215,"about_ca_topic_score_gemma":0.5962537,"teacher_disagreement_score":0.9920417,"about_ca_system_score_codex":0.007958301,"about_ca_system_score_gemma":0.014680482,"threshold_uncertainty_score":0.7083372},"labels":[],"label_agreement":null},{"id":"W4401843417","doi":"10.1080/01446193.2024.2390529","title":"A research and development framework for integrated project delivery","year":2024,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; École de Technologie Supérieure","funders":"","keywords":"Integrated project delivery; Process management; Systems engineering; Engineering management; Business; Development (topology); Engineering; Computer science; Knowledge management; Project management","score_opus":0.20600805796180766,"score_gpt":0.40521663030044486,"score_spread":0.1992085723386372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401843417","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035272525,0.0062134014,0.81842834,0.030916626,0.0005580136,0.005778044,0.0008979032,0.00042694533,0.13325347],"genre_scores_gemma":[0.063190766,0.0043764533,0.91725713,0.0012615923,0.00012938085,0.0076071704,0.00069505634,0.00008897398,0.005393492],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.916094,0.06350826,0.0061514606,0.0045080194,0.007061076,0.0026771803],"domain_scores_gemma":[0.9231442,0.05173893,0.00523453,0.0041692504,0.012624793,0.003088279],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.096691385,0.0025195493,0.0015273917,0.01811395,0.006631026,0.018922364,0.007271942,0.007341881,0.00991608],"category_scores_gemma":[0.05364574,0.0013954823,0.0034147077,0.018182417,0.019004758,0.018885376,0.01084541,0.005848585,0.0034648539],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010375959,0.000055247885,0.000469801,0.00073411764,0.000020800611,0.00021346212,0.004199412,0.0019778342,0.000123911,0.9620869,0.0034001467,0.026708065],"study_design_scores_gemma":[0.00007286851,0.0001417259,0.0009763293,0.0043359487,0.000063644206,0.0003794497,0.011030695,0.007554298,0.000496082,0.6391891,0.33568126,0.00007857983],"about_ca_topic_score_codex":0.018720182,"about_ca_topic_score_gemma":0.015266898,"teacher_disagreement_score":0.096691385,"about_ca_system_score_codex":0.030768296,"about_ca_system_score_gemma":0.07030759,"threshold_uncertainty_score":0.51135904},"labels":[],"label_agreement":null},{"id":"W4401974641","doi":"10.3390/buildings14082563","title":"Risk Analysis in International Construction Projects: A Look at the Prefabricated Wood Construction Sector in the Province of Quebec","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval; Natural Sciences and Engineering Research Council of Canada","funders":"Natural Sciences and Engineering Research Council of Canada; Université Laval","keywords":"Engineering; Architectural engineering; Civil engineering; Prefabrication; Construction engineering; Construction industry; Forensic engineering; Business","score_opus":0.02842036216417607,"score_gpt":0.3092070215004916,"score_spread":0.2807866593363155,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401974641","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97403616,0.0026208637,0.0012680977,0.0023566515,0.000017418193,0.00008053362,0.0004211533,0.000017698532,0.019181516],"genre_scores_gemma":[0.9946115,0.0015282533,0.00041595017,0.000112356196,0.0000056842364,0.000012177351,0.00019660614,0.000004973535,0.0031124956],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99882334,0.00016554161,0.000038176848,0.000071238224,0.00051836675,0.0003833294],"domain_scores_gemma":[0.9958674,0.00070905074,0.00084288826,0.000062950436,0.002069917,0.00044781834],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014857146,0.0003576352,0.00020659123,0.0030887169,0.0031942634,0.0023841008,0.00066139956,0.0006837835,0.0019996776],"category_scores_gemma":[0.0033134366,0.00012791046,0.0004262497,0.0048397267,0.0009023701,0.00074938964,0.0010631492,0.00075033616,0.00010194985],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012548547,0.0002602094,0.82762045,0.0004993884,0.00013733626,0.006326322,0.034875236,0.016122099,0.0020794629,0.00736,0.007782693,0.096811235],"study_design_scores_gemma":[0.000004684166,0.00009103545,0.86991006,0.00036416337,0.000044671764,0.0006873621,0.09819826,0.007606384,0.00033864894,0.0005329708,0.022158112,0.00006367638],"about_ca_topic_score_codex":0.94679517,"about_ca_topic_score_gemma":0.9621211,"teacher_disagreement_score":0.053204834,"about_ca_system_score_codex":0.028829638,"about_ca_system_score_gemma":0.022570498,"threshold_uncertainty_score":0.20917463},"labels":[],"label_agreement":null},{"id":"W4402030742","doi":"10.1002/9781119902317.ch11","title":"How Digital Projects are Changing Contracts","year":2024,"lang":"en","type":"other","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Business; Computer science","score_opus":0.09410494810554398,"score_gpt":0.3380027685536995,"score_spread":0.2438978204481555,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402030742","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09965413,0.0035621936,0.040835984,0.071910135,0.0008569823,0.00015698574,0.00011432944,0.00017394462,0.7827353],"genre_scores_gemma":[0.8836977,0.0053037205,0.01580333,0.005133524,0.00026745303,0.00024368509,0.00012373421,0.00028266295,0.08914422],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9710363,0.018148227,0.00079358753,0.0013800634,0.006602696,0.0020390297],"domain_scores_gemma":[0.9887162,0.004894957,0.0011526386,0.0018947073,0.0015644311,0.0017771863],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015816921,0.0002822412,0.0002536826,0.001985731,0.009209797,0.02245651,0.0016548494,0.0035280793,0.015081876],"category_scores_gemma":[0.031914704,0.00045944125,0.00045197684,0.0040241997,0.027373169,0.020745477,0.015002638,0.004705801,0.0021426233],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011515583,0.000022174396,0.0008349573,0.00003852166,0.000003906838,0.00014393732,0.01883425,0.00041172066,0.00009479441,0.9496744,0.005077363,0.02485248],"study_design_scores_gemma":[0.000014539343,0.00003065178,0.0010638074,0.00024801889,0.000006295383,0.00029870644,0.03896437,0.0006796119,0.00020551556,0.37937194,0.57908833,0.00002821548],"about_ca_topic_score_codex":0.008074864,"about_ca_topic_score_gemma":0.006542438,"teacher_disagreement_score":0.02245651,"about_ca_system_score_codex":0.008858162,"about_ca_system_score_gemma":0.010713638,"threshold_uncertainty_score":0.08364892},"labels":[],"label_agreement":null},{"id":"W4402055425","doi":"10.18280/ijsse.140413","title":"Managing of Subcontractors Failure in Construction Projects","year":2024,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Construction engineering; Forensic engineering; Business; Risk analysis (engineering); Engineering","score_opus":0.017558355788323307,"score_gpt":0.2927933311441587,"score_spread":0.27523497535583535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402055425","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9550489,0.00024122154,0.025632361,0.0006972459,0.000031678454,0.0002726374,0.000062729865,0.00021006855,0.017803121],"genre_scores_gemma":[0.99574655,0.00005255027,0.002428357,0.000016692233,0.0000075519793,0.00003062793,0.00002691546,0.000009448179,0.0016813376],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.998024,0.0007864377,0.00009554731,0.0001462283,0.00052183855,0.0004260184],"domain_scores_gemma":[0.9944989,0.0019396343,0.0012447564,0.00026634271,0.0013070102,0.0007433276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025719444,0.00056168373,0.00035664154,0.0013434694,0.0019200194,0.0028531405,0.0012669541,0.0010299948,0.0026424017],"category_scores_gemma":[0.007739195,0.00024689015,0.00024719822,0.0006780632,0.00044244534,0.001247407,0.0011939616,0.00073531247,0.0004045958],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012512782,0.0013495787,0.20994979,0.00034217603,0.00017398549,0.0035278448,0.0064666206,0.21705818,0.021987757,0.0077809906,0.0072795185,0.5228324],"study_design_scores_gemma":[0.00013180234,0.0036678496,0.28205913,0.00027471018,0.00027124002,0.0016746294,0.03756126,0.62878346,0.0135957,0.01269136,0.01910857,0.00018017065],"about_ca_topic_score_codex":0.007817719,"about_ca_topic_score_gemma":0.010318891,"teacher_disagreement_score":0.007817719,"about_ca_system_score_codex":0.001251209,"about_ca_system_score_gemma":0.0027050069,"threshold_uncertainty_score":0.0155444145},"labels":[],"label_agreement":null},{"id":"W4402138619","doi":"10.1080/02646811.2024.2388451","title":"Showcase panel – risk management for the swift implementation of energy transition projects","year":2024,"lang":"en","type":"article","venue":"Journal of Energy & Natural Resources Law","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Alberta Energy","funders":"","keywords":"Swift; Transition (genetics); Risk management; Computer science; Business; Risk analysis (engineering); Chemistry; Finance; Programming language","score_opus":0.047695971423913214,"score_gpt":0.34319347922422144,"score_spread":0.29549750780030826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402138619","genre_codex":"other","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023722224,0.0019025927,0.054310717,0.24951416,0.00499421,0.001312227,0.0024404589,0.0031677764,0.6586357],"genre_scores_gemma":[0.4136828,0.0018080588,0.035605952,0.04242826,0.003130331,0.0010497432,0.0024738512,0.0009865827,0.49883446],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9938923,0.002246977,0.00014406368,0.00041879094,0.0023210184,0.0009767598],"domain_scores_gemma":[0.9887255,0.0032106896,0.00073784473,0.0009699609,0.0037319353,0.0026241099],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01155315,0.0007558773,0.00022766463,0.00086774037,0.0034319253,0.006748789,0.0018686817,0.008354503,0.07523026],"category_scores_gemma":[0.019721704,0.0002950145,0.000558254,0.0005605801,0.0011275944,0.0038240221,0.00496513,0.004600366,0.014331633],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018927552,0.00019248496,0.0018942668,0.00008537494,0.000023824492,0.00033891556,0.0005312395,0.00400048,0.0015677238,0.055835623,0.8853309,0.050009754],"study_design_scores_gemma":[0.000067398396,0.00027032115,0.005261249,0.00029330578,0.000030623174,0.00016742194,0.0011533943,0.008192511,0.0033677598,0.048918646,0.93215734,0.00011991414],"about_ca_topic_score_codex":0.009359237,"about_ca_topic_score_gemma":0.023082156,"teacher_disagreement_score":0.07523026,"about_ca_system_score_codex":0.002765604,"about_ca_system_score_gemma":0.007949482,"threshold_uncertainty_score":0.2516703},"labels":[],"label_agreement":null},{"id":"W4402152595","doi":"10.36615/jcpmi.v14i2.2420","title":"Identifying the interests of stakeholders in large construction projects: Based on Justification theory of Boltanski and Thévenot","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Project Management and Innovation","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec en Outaouais","funders":"","keywords":"Stakeholder; Compromise; Process (computing); Competition (biology); Stakeholder theory; Exploratory research; Business; Public relations; Sociology; Political science; Computer science; Social science","score_opus":0.1763859801911383,"score_gpt":0.37790752553619217,"score_spread":0.20152154534505387,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402152595","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26354918,0.007857169,0.30971482,0.03647038,0.0003615406,0.0017202467,0.0001744988,0.00006251986,0.38008964],"genre_scores_gemma":[0.970951,0.0014321362,0.023466792,0.0006392504,0.000037701477,0.000584136,0.000044559267,0.000015344925,0.002829109],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97419655,0.017906975,0.0010016811,0.0009981162,0.0046753353,0.0012214466],"domain_scores_gemma":[0.9631719,0.028353881,0.0025517542,0.000720906,0.00454368,0.0006578432],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019133369,0.0006804843,0.00074836274,0.009261982,0.007247316,0.008341555,0.0016693455,0.003990631,0.0022830737],"category_scores_gemma":[0.031069633,0.0005600007,0.000896173,0.005604647,0.0226013,0.01574313,0.005904762,0.0030448502,0.0003410932],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033271775,0.00008447302,0.004663535,0.00056069234,0.000027754308,0.0009679952,0.09826742,0.0008396352,0.0005385776,0.8650908,0.0016033731,0.02732255],"study_design_scores_gemma":[0.00005160116,0.00009695141,0.0056668413,0.0020333838,0.00006119263,0.0012888019,0.13415377,0.00628232,0.0009795668,0.76974,0.07953633,0.00010923392],"about_ca_topic_score_codex":0.0030521266,"about_ca_topic_score_gemma":0.0041690622,"teacher_disagreement_score":0.019133369,"about_ca_system_score_codex":0.009741319,"about_ca_system_score_gemma":0.0091148,"threshold_uncertainty_score":0.10118818},"labels":[],"label_agreement":null},{"id":"W4402477112","doi":"10.11159/icceia24.107","title":"Enhancing Construction Efficiency through Last Planner System: A Study of Cultural Integration and Team Feedback Dynamics","year":2024,"lang":"en","type":"article","venue":"Proceedings of the World Congress on New Technologies","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Planner; Dynamics (music); System dynamics; Computer science; Human–computer interaction; Knowledge management; Artificial intelligence; Psychology","score_opus":0.031241598599666395,"score_gpt":0.3130529678316701,"score_spread":0.2818113692320037,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402477112","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9946616,0.000011563958,0.0025890183,0.000056881538,0.000002344034,0.000020837588,0.0000071175978,0.000007097107,0.0026434395],"genre_scores_gemma":[0.99830014,0.000009466332,0.0011317951,0.000008121854,8.9557113e-7,0.00001228037,0.0000063404414,0.000005840336,0.00052507466],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9984602,0.0010472041,0.00003382877,0.00011667069,0.00017287943,0.00016934206],"domain_scores_gemma":[0.99291766,0.0046965326,0.000871552,0.00038605917,0.00060784887,0.0005205076],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003083135,0.00033034384,0.0003522819,0.00074045063,0.0012017917,0.0020990246,0.0008064301,0.00064618204,0.0029724767],"category_scores_gemma":[0.010704135,0.00023599065,0.00028975008,0.00062130933,0.001298293,0.0020033666,0.0013435892,0.00070341956,0.00017805777],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0061215227,0.014440493,0.44742927,0.0006182386,0.00067275896,0.0019298954,0.078102134,0.13898969,0.03762048,0.07014773,0.002341976,0.2015859],"study_design_scores_gemma":[0.0006687808,0.006811225,0.30346835,0.00013059373,0.0005487238,0.00036402183,0.08851376,0.56439483,0.013463429,0.013689828,0.0077794055,0.000167056],"about_ca_topic_score_codex":0.010377309,"about_ca_topic_score_gemma":0.010215272,"teacher_disagreement_score":0.010377309,"about_ca_system_score_codex":0.0022566156,"about_ca_system_score_gemma":0.0019345998,"threshold_uncertainty_score":0.020633817},"labels":[],"label_agreement":null},{"id":"W4402547018","doi":"10.1177/87569728241279506","title":"Exploring the Connections Between Project Management Offices and Organizational Design","year":2024,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; HEC Montréal","funders":"","keywords":"OPM3; Business; Project management; Design management; Process management; Organizational architecture; Engineering; Engineering management; Knowledge management; Program management; Management; Computer science; Systems engineering; Information management; Economics","score_opus":0.3283397689247059,"score_gpt":0.38514064827000644,"score_spread":0.05680087934530054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402547018","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6526787,0.00045859418,0.008963455,0.01105017,0.00005090425,0.00012089465,0.0004201083,0.00004228067,0.32621485],"genre_scores_gemma":[0.9831634,0.00013818279,0.0024080426,0.00018742905,0.000008020629,0.000037679994,0.000080306374,0.00003034987,0.013946609],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9968913,0.0019762237,0.00003881481,0.00017444752,0.000601446,0.00031770937],"domain_scores_gemma":[0.97674805,0.017093234,0.0014211049,0.0006027632,0.0024134002,0.0017215125],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035490221,0.00019588285,0.00018898782,0.0012273507,0.0041711098,0.005899276,0.0008142925,0.00077643176,0.024038266],"category_scores_gemma":[0.019141061,0.00019624065,0.00020243437,0.0022447607,0.0033201156,0.0017494814,0.001995024,0.0014970938,0.0007778833],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00068133615,0.0012724987,0.24799117,0.00029208048,0.00007740677,0.0010982987,0.050091945,0.007818034,0.0024758202,0.44552705,0.02314843,0.21952598],"study_design_scores_gemma":[0.00016111822,0.00030275917,0.53383946,0.000552255,0.000069720394,0.00025066224,0.13169774,0.030020636,0.0015511169,0.15103902,0.15042423,0.00009127599],"about_ca_topic_score_codex":0.36980715,"about_ca_topic_score_gemma":0.56336945,"teacher_disagreement_score":0.36980715,"about_ca_system_score_codex":0.012663465,"about_ca_system_score_gemma":0.016281469,"threshold_uncertainty_score":0.73530924},"labels":[],"label_agreement":null},{"id":"W4402594163","doi":"10.1109/blockchain62396.2024.00013","title":"An AI Multi-Model Approach to DeFi Project Trust Scoring and Security","year":2024,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Computer science; Artificial intelligence; Computer security","score_opus":0.1591069400021257,"score_gpt":0.4259692871598585,"score_spread":0.2668623471577328,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402594163","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04859524,0.00021690966,0.94562316,0.0009106738,0.00006146728,0.00011945942,0.0003443328,0.0012034487,0.0029252674],"genre_scores_gemma":[0.80410117,0.00011883049,0.19115561,0.00024839016,0.00009981341,0.00020112374,0.00059001724,0.00010176962,0.0033832951],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986726,0.00057173934,0.00008666097,0.00028666045,0.00024376212,0.0001385894],"domain_scores_gemma":[0.996024,0.0025388603,0.00039808117,0.00021416978,0.0006670163,0.00015781155],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024705387,0.0011307913,0.0007297223,0.0016041716,0.00059375115,0.0017344664,0.0015966455,0.0012705784,0.002468785],"category_scores_gemma":[0.008780308,0.0005899053,0.0010920542,0.000947545,0.0006482225,0.0015426603,0.001261616,0.002095522,0.0004305567],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010574707,0.00008425065,0.0055012745,0.00005953449,0.00015283533,0.00011907312,0.00013875119,0.93014413,0.0009959978,0.009737187,0.0014742202,0.05148694],"study_design_scores_gemma":[0.000002424261,0.000008031523,0.0001655105,0.0000025732152,0.000005651146,0.000006390806,0.0000067351443,0.9965569,0.00010512003,0.0029963495,0.00014105665,0.0000033354863],"about_ca_topic_score_codex":0.015214735,"about_ca_topic_score_gemma":0.016702564,"teacher_disagreement_score":0.015214735,"about_ca_system_score_codex":0.0018642037,"about_ca_system_score_gemma":0.0013610402,"threshold_uncertainty_score":0.030252337},"labels":[],"label_agreement":null},{"id":"W4402596340","doi":"10.1061/jcemd4.coeng-14540","title":"The Need for a Multidimensional Project Control Perspective","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Perspective (graphical); Control (management); Computer science; Process management; Psychology; Engineering; Artificial intelligence","score_opus":0.023719385491330507,"score_gpt":0.32151474108833844,"score_spread":0.2977953555970079,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402596340","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03246613,0.0017255602,0.93543845,0.002750703,0.00013803039,0.00028509522,0.00011634369,0.00012157893,0.026958125],"genre_scores_gemma":[0.59022826,0.0015313209,0.40550822,0.00039814098,0.0001515887,0.0004897161,0.000113478185,0.00006588717,0.0015133622],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9844349,0.00824561,0.00091207365,0.0018033123,0.0040994943,0.0005046332],"domain_scores_gemma":[0.9864775,0.0073136045,0.0020707978,0.0016138637,0.0020121112,0.0005122242],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010118532,0.0011152156,0.0009250623,0.003038013,0.0009893752,0.007976946,0.0016292311,0.0014061508,0.0022466208],"category_scores_gemma":[0.0116841085,0.00067117286,0.0011170582,0.0020038385,0.0044325297,0.0062760226,0.0035721005,0.0028503092,0.0002558766],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014891317,0.00028377352,0.009645636,0.001139897,0.00017616262,0.00021207432,0.0025111758,0.22123292,0.004754765,0.5913464,0.0016614186,0.16688684],"study_design_scores_gemma":[0.00014169412,0.0013574191,0.012091834,0.0014020443,0.0001875233,0.00040901825,0.006341143,0.4875784,0.0062194136,0.42583257,0.05808258,0.00035636473],"about_ca_topic_score_codex":0.0032008595,"about_ca_topic_score_gemma":0.0025570893,"teacher_disagreement_score":0.010118532,"about_ca_system_score_codex":0.0033706438,"about_ca_system_score_gemma":0.0045502284,"threshold_uncertainty_score":0.053512514},"labels":[],"label_agreement":null},{"id":"W4402697336","doi":"10.1080/15623599.2024.2404286","title":"Disability inclusion studies in the construction industry: a mixed review approach","year":2024,"lang":"en","type":"review","venue":"International Journal of Construction Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Inclusion (mineral); Business; Sociology; Gender studies","score_opus":0.2985584509050042,"score_gpt":0.5199465035211241,"score_spread":0.22138805261611993,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402697336","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031135792,0.9881295,0.0022726627,0.0014337954,0.00059861015,0.0022654827,0.00041041803,0.000016578277,0.0017592896],"genre_scores_gemma":[0.028740298,0.95688325,0.0071249655,0.0013350956,0.0003235208,0.004683907,0.00031571588,0.000018942752,0.00057429547],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.96336204,0.014064904,0.013514785,0.0016671859,0.0067558875,0.0006351582],"domain_scores_gemma":[0.8604347,0.10601963,0.011507229,0.0032853684,0.017661145,0.0010919478],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.045882113,0.0013974966,0.004938004,0.036142424,0.0020008942,0.006624857,0.002171055,0.0026824332,0.0038171767],"category_scores_gemma":[0.12033449,0.0012154041,0.004388464,0.029266272,0.001702524,0.0053879065,0.0039066933,0.0014274176,0.0006194445],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020631446,0.00007646197,0.0022104054,0.78585637,0.0035968844,0.0006074737,0.0040889224,0.00022265212,0.0009675983,0.0042370036,0.0036207042,0.19430926],"study_design_scores_gemma":[0.00007722231,0.0003925605,0.0037723763,0.86451995,0.014045159,0.0013897237,0.0065320986,0.00017009862,0.0009880797,0.002332649,0.10570101,0.00007908442],"about_ca_topic_score_codex":0.0033795792,"about_ca_topic_score_gemma":0.012890495,"teacher_disagreement_score":0.045882113,"about_ca_system_score_codex":0.006064511,"about_ca_system_score_gemma":0.02204904,"threshold_uncertainty_score":0.24265075},"labels":[],"label_agreement":null},{"id":"W4402746450","doi":"10.1061/jcemd4.coeng-15041","title":"A Process-Improvement Method for Implementing Earned Value–Based Project Management in Organizations","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Earned value management; Value (mathematics); Process (computing); Process management; Project management; Business; OPM3; Computer science; Engineering management; Operations management; Program management; Engineering; Systems engineering","score_opus":0.028806829062632433,"score_gpt":0.366167920112844,"score_spread":0.33736109105021156,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402746450","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008049576,0.000051558265,0.98441005,0.0003084184,0.00002107589,0.0009910914,0.000046776837,0.0007699656,0.0053514475],"genre_scores_gemma":[0.0412955,0.00005089677,0.9568281,0.00003158017,0.0000040786067,0.0008638558,0.000057679157,0.000036183992,0.00083198544],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98478645,0.007952,0.0009433805,0.0013304292,0.0046303174,0.00035739152],"domain_scores_gemma":[0.98786736,0.005925974,0.0013023759,0.0017781609,0.002925663,0.0002004106],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013353207,0.0011553179,0.0005148167,0.0034723452,0.0013864746,0.0029215408,0.0017131249,0.0010949663,0.0032389022],"category_scores_gemma":[0.016290484,0.00074489345,0.0009782927,0.0026823897,0.0016602033,0.0032204173,0.001996083,0.001486282,0.0007548152],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016751884,0.000818641,0.004578466,0.0009643639,0.000076817814,0.0002311555,0.007303527,0.026246151,0.010042762,0.10083323,0.00312129,0.8456161],"study_design_scores_gemma":[0.00086685945,0.0048508556,0.01577631,0.0024505013,0.00045677365,0.0013928994,0.008787341,0.5687805,0.07310448,0.14557718,0.17742097,0.00053537585],"about_ca_topic_score_codex":0.002885022,"about_ca_topic_score_gemma":0.0031785136,"teacher_disagreement_score":0.013353207,"about_ca_system_score_codex":0.0021802003,"about_ca_system_score_gemma":0.0062612747,"threshold_uncertainty_score":0.070619404},"labels":[],"label_agreement":null},{"id":"W4402796224","doi":"10.46254/na09.20240161","title":"Navigating Complexity and Scheduling in Mega Construction Projects: Integrating FRAM with PMBOK for Enhanced Project Management — A Case Study of the Channel Tunnel Project","year":2024,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Project management; Channel tunnel; Mega-; Scheduling (production processes); Channel (broadcasting); Engineering management; Systems engineering; Engineering; Construction engineering; Computer science; Civil engineering; Telecommunications; Operations management; Physics","score_opus":0.14264468903770797,"score_gpt":0.4124083539785654,"score_spread":0.26976366494085746,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402796224","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9221815,0.00024830105,0.05632935,0.0014537442,0.000021847314,0.00040416032,0.000060875835,0.000071623384,0.019228475],"genre_scores_gemma":[0.9348412,0.00028070319,0.06278507,0.00007208489,0.0000064220812,0.0001596847,0.000035940833,0.000021949729,0.0017967513],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99658054,0.002267391,0.00009715413,0.0001933807,0.00051817985,0.00034332628],"domain_scores_gemma":[0.995426,0.003084175,0.0004094924,0.00034824552,0.00038067283,0.0003514717],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004630507,0.00029607676,0.00030776684,0.0014318213,0.0026858759,0.0023383696,0.0012133076,0.0012132677,0.0015486608],"category_scores_gemma":[0.006804895,0.00030223254,0.00030883262,0.0015390883,0.0024058209,0.0017804005,0.0028057871,0.0010481152,0.00021927453],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00053876283,0.0018038681,0.06312761,0.0017515557,0.00009181929,0.017611952,0.22918917,0.068766974,0.015272141,0.06496701,0.006027399,0.5308517],"study_design_scores_gemma":[0.00014146823,0.0020103902,0.066504516,0.0016497497,0.00016768748,0.0056457017,0.5248047,0.2017743,0.0142537085,0.046250485,0.13643017,0.00036708175],"about_ca_topic_score_codex":0.005486854,"about_ca_topic_score_gemma":0.020047788,"teacher_disagreement_score":0.005486854,"about_ca_system_score_codex":0.0024099937,"about_ca_system_score_gemma":0.0045393044,"threshold_uncertainty_score":0.024488747},"labels":[],"label_agreement":null},{"id":"W4402856099","doi":"10.1108/ijmpb-03-2024-0056","title":"Project governance: the impact of environmental changes on governance adaptations in large-scale projects","year":2024,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Project governance; Corporate governance; Environmental governance; Originality; Scale (ratio); Environmental resource management; Project management; Theory of change; Business; Process management; Sociology; Economics; Management; Qualitative research; Finance; Social science","score_opus":0.055051998415652684,"score_gpt":0.3649448039160388,"score_spread":0.3098928055003861,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402856099","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9818193,0.0003109292,0.004551751,0.0007119036,0.000015905332,0.000101285594,0.000059296337,0.000021179872,0.012408457],"genre_scores_gemma":[0.9992093,0.00005593382,0.0005205634,0.000017462324,0.000002836493,0.000015268635,0.000013338322,0.000002931603,0.00016238049],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98750556,0.00810185,0.000689696,0.0010203515,0.0015568382,0.0011256589],"domain_scores_gemma":[0.9503067,0.024076797,0.014509631,0.0037287541,0.004648281,0.0027298315],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0103754345,0.00021417692,0.0002182612,0.0011392224,0.0012925516,0.0032668407,0.0006588808,0.0005782929,0.0027989831],"category_scores_gemma":[0.041298468,0.00020890181,0.00021211863,0.0014708512,0.0036745544,0.0026899304,0.003486662,0.0008034104,0.00017499794],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033363263,0.00059022295,0.7803638,0.00072227715,0.00016387609,0.0011634106,0.027987257,0.009709417,0.0036621995,0.016059741,0.0015346948,0.1577096],"study_design_scores_gemma":[0.000013920569,0.0006769233,0.9306451,0.00039975767,0.000052759002,0.00035781114,0.044820953,0.003078004,0.001707856,0.007680703,0.010517748,0.00004855763],"about_ca_topic_score_codex":0.0025813794,"about_ca_topic_score_gemma":0.0057878173,"teacher_disagreement_score":0.0103754345,"about_ca_system_score_codex":0.0029005061,"about_ca_system_score_gemma":0.0028337974,"threshold_uncertainty_score":0.0548712},"labels":[],"label_agreement":null},{"id":"W4402869738","doi":"10.5267/j.jpm.2024.7.001","title":"The impact of leadership styles on project success: The mediating role of team collaboration","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"King Khalid University","keywords":"Leadership style; Psychology; Knowledge management; Management; Business; Social psychology; Computer science","score_opus":0.10025114265585525,"score_gpt":0.41817778456601845,"score_spread":0.3179266419101632,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402869738","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9905524,0.00016124961,0.0014851278,0.00020150417,0.000014856844,0.000029303996,0.000020451573,0.000010911968,0.007524105],"genre_scores_gemma":[0.9991881,0.00008536194,0.00043410072,0.000011422532,0.000007100526,0.0000131589195,0.000008630077,0.0000023629257,0.0002496309],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99392325,0.003988051,0.00026023865,0.00023155687,0.0009776695,0.00061936816],"domain_scores_gemma":[0.97262925,0.014872783,0.0046621435,0.001174124,0.0021679804,0.0044937837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0047515566,0.00044284706,0.00028823796,0.00079075503,0.00083862286,0.001995264,0.00037325133,0.00023619254,0.0035558597],"category_scores_gemma":[0.018546894,0.0001518641,0.00038446355,0.0005617135,0.0007039091,0.0009360385,0.0025906,0.0006544502,0.0002681398],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001820566,0.0005604901,0.8705143,0.00016296911,0.00024135812,0.000579703,0.009951486,0.00062007917,0.0017377024,0.0019187455,0.0004103358,0.11312092],"study_design_scores_gemma":[0.000043864544,0.000922652,0.9721387,0.00023360369,0.00012219914,0.0004396795,0.017880173,0.0024336583,0.000931882,0.0022310622,0.0025955457,0.000027027667],"about_ca_topic_score_codex":0.0010507151,"about_ca_topic_score_gemma":0.0015358033,"teacher_disagreement_score":0.0047515566,"about_ca_system_score_codex":0.00038940317,"about_ca_system_score_gemma":0.0019186402,"threshold_uncertainty_score":0.02512896},"labels":[],"label_agreement":null},{"id":"W4402869792","doi":"10.5267/j.jpm.2024.7.002","title":"Risk management in Egyptian construction: Comparative analysis of general and banking sectors using advanced quantitative methods","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Risk management; Risk analysis (engineering); Computer science; Finance","score_opus":0.15118815817983536,"score_gpt":0.49468175216695776,"score_spread":0.3434935939871224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402869792","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9950352,0.00040476053,0.0019151005,0.00007233774,0.000002416235,0.00004457245,0.00010108626,0.0000049205005,0.0024198222],"genre_scores_gemma":[0.99803895,0.00031309543,0.0010782673,0.000009499637,0.000001930655,0.00002312445,0.00008528833,0.0000015904125,0.000448354],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9983222,0.00074628845,0.0001699922,0.00013600154,0.00040434932,0.00022113662],"domain_scores_gemma":[0.9956921,0.0018807772,0.0010209302,0.00016716863,0.0011008012,0.00013825236],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029684375,0.00033325146,0.0003151925,0.005052056,0.00046516408,0.0014474769,0.00028272354,0.0003157444,0.0014581882],"category_scores_gemma":[0.004688544,0.00014354661,0.0004610487,0.0057396027,0.0008429078,0.0007750674,0.0010928451,0.00021390143,0.00012122694],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065671105,0.00039006612,0.77566564,0.0009916031,0.00034514698,0.000818744,0.030367564,0.009080634,0.0027860198,0.0071704225,0.0008375522,0.17088984],"study_design_scores_gemma":[0.0000145709355,0.00041437952,0.915541,0.00021748603,0.00012590764,0.00043069097,0.06567836,0.010569767,0.0012590667,0.0016672172,0.004039656,0.000042001106],"about_ca_topic_score_codex":0.01017056,"about_ca_topic_score_gemma":0.013856558,"teacher_disagreement_score":0.01017056,"about_ca_system_score_codex":0.002451291,"about_ca_system_score_gemma":0.0013710108,"threshold_uncertainty_score":0.020222723},"labels":[],"label_agreement":null},{"id":"W4402870764","doi":"10.5267/j.jpm.2024.9.003","title":"Evaluating the impact of scope, time, cost, and quality management on project performance and business overall performance in Jordanian financial sector ,","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Applied Science Private University","keywords":"Scope (computer science); Business; Quality (philosophy); Finance; Quality costs; Computer science; Cost control","score_opus":0.16236003379900568,"score_gpt":0.4488349781110999,"score_spread":0.2864749443120942,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402870764","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9981907,0.000093667106,0.0001962786,0.00006310681,0.0000018111871,0.0000220387,0.000015848738,0.0000018637006,0.0014147217],"genre_scores_gemma":[0.9989236,0.000109449116,0.0005447618,0.000015524354,0.0000034999807,0.000026309104,0.000031255287,0.0000016269375,0.0003440526],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9940096,0.0028784445,0.00045245522,0.00027518024,0.0017399376,0.00064441765],"domain_scores_gemma":[0.97724324,0.009322859,0.006701541,0.0004892767,0.004406965,0.0018361398],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008224099,0.00035817994,0.00028477926,0.0014263157,0.0009427677,0.0021448846,0.00045020462,0.00035067872,0.001414754],"category_scores_gemma":[0.017628089,0.00020761251,0.00035926915,0.0013796063,0.0008766856,0.0011344602,0.0013207807,0.00052307843,0.00018760432],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003535938,0.0010239155,0.8608037,0.00028823534,0.00012906846,0.000387042,0.011840391,0.0023504642,0.0020615435,0.0013412251,0.0005972239,0.11882351],"study_design_scores_gemma":[0.000009934289,0.001100866,0.9748925,0.00008881525,0.000045909455,0.00010185924,0.018302536,0.002365944,0.0011060017,0.00036734762,0.0015945877,0.000023661523],"about_ca_topic_score_codex":0.003570928,"about_ca_topic_score_gemma":0.00808019,"teacher_disagreement_score":0.008224099,"about_ca_system_score_codex":0.0018499347,"about_ca_system_score_gemma":0.003873889,"threshold_uncertainty_score":0.043493688},"labels":[],"label_agreement":null},{"id":"W4403195675","doi":"10.3311/ccc2024-076","title":"Exploring Working Women’s Experience With Mentorship in The Construction Trades: A Qualitative Analysis","year":2024,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"University of Kentucky","keywords":"Mentorship; Qualitative research; Qualitative analysis; Computer science; Medical education; Sociology; Medicine; Social science","score_opus":0.45827489250890147,"score_gpt":0.4553051198200073,"score_spread":0.0029697726888941456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403195675","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97315526,0.0011339309,0.004954297,0.004312054,0.00018777064,0.00028587482,0.0003786762,0.000037708116,0.0155543415],"genre_scores_gemma":[0.9849523,0.0015636139,0.0016780648,0.001062645,0.0000720752,0.0004006296,0.00017587662,0.0000636184,0.01003113],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99323374,0.004268206,0.00020310213,0.00037770596,0.0007300678,0.0011871746],"domain_scores_gemma":[0.9840353,0.012977396,0.0006425962,0.00026246288,0.0010350243,0.0010472208],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010145332,0.0007410376,0.000891989,0.002610134,0.009666199,0.006191376,0.0017980174,0.0021847144,0.004347892],"category_scores_gemma":[0.014716779,0.0006247313,0.0005068313,0.0032082212,0.009372647,0.0043600653,0.0052249315,0.0029718094,0.00056359504],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002103084,0.000016796552,0.0011567632,0.00008148409,0.0000018554016,0.0005654081,0.99307305,0.000021052392,0.00040108716,0.00095899624,0.000412133,0.0032903892],"study_design_scores_gemma":[0.0000016912393,0.000020460902,0.0007784102,0.000105526655,0.0000019492368,0.00014035289,0.9889886,0.000030785515,0.00021947567,0.00016368106,0.009542535,0.0000066102893],"about_ca_topic_score_codex":0.009645142,"about_ca_topic_score_gemma":0.01427009,"teacher_disagreement_score":0.010145332,"about_ca_system_score_codex":0.005254274,"about_ca_system_score_gemma":0.005333905,"threshold_uncertainty_score":0.053654313},"labels":[],"label_agreement":null},{"id":"W4403649681","doi":"10.1108/ijmpb-04-2024-0085","title":"Hero's journey as a framework to study a project manager","year":2024,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"HERO; Management; Process management; Project manager; Sociology; Business; Project management; Art; Literature; Economics","score_opus":0.1126806734015665,"score_gpt":0.45162927213895476,"score_spread":0.33894859873738825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403649681","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5454851,0.018751308,0.077150054,0.08358529,0.001851023,0.0013421322,0.00039551844,0.00026491223,0.2711746],"genre_scores_gemma":[0.9634022,0.0036322006,0.014684028,0.0031899204,0.00011744941,0.00058676704,0.00007556884,0.000090262576,0.014221549],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.98180526,0.015908398,0.00019900493,0.00064020144,0.0006365298,0.00081055105],"domain_scores_gemma":[0.988789,0.0048368224,0.0009799312,0.00054951524,0.0009901624,0.0038546848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010981255,0.00075639,0.0004771188,0.0020289943,0.011795355,0.0111475615,0.0016431748,0.0018358871,0.0052782586],"category_scores_gemma":[0.008873531,0.00046735365,0.00045376408,0.0016024383,0.025840305,0.013706576,0.009241766,0.005427378,0.0008181959],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046559064,0.00009786314,0.0039669974,0.00033510444,0.000011576256,0.0008907862,0.7265842,0.00025663152,0.00030929173,0.24470118,0.0108366385,0.011963199],"study_design_scores_gemma":[0.000016641983,0.000121815465,0.002033387,0.0006301798,0.0000101476935,0.0010613172,0.7558843,0.00067048625,0.0001897777,0.032536376,0.20681015,0.00003543332],"about_ca_topic_score_codex":0.0071137357,"about_ca_topic_score_gemma":0.010306802,"teacher_disagreement_score":0.011795355,"about_ca_system_score_codex":0.009740174,"about_ca_system_score_gemma":0.009112785,"threshold_uncertainty_score":0.07067025},"labels":[],"label_agreement":null},{"id":"W4403748846","doi":"10.24908/pceea.2023.17160","title":"Taking Project Planning Seriously by Removing Project Deliverable Due Dates: First Attempt","year":2024,"lang":"en","type":"article","venue":"Proceedings of the Canadian Engineering Education Association (CEEA)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Deliverable; Project planning; Project management; Environmental planning; Operations management; Engineering management; Engineering; Geography; Systems engineering","score_opus":0.03169135355388612,"score_gpt":0.3054701880608653,"score_spread":0.27377883450697915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403748846","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79681313,0.00078527053,0.1384047,0.0046413066,0.00041662192,0.001118485,0.00012154953,0.0009921659,0.05670673],"genre_scores_gemma":[0.8641121,0.0004903707,0.1272,0.00043856824,0.00006597406,0.00032813553,0.00009164179,0.000111861504,0.0071614548],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9917898,0.0034550799,0.00041536803,0.0004738407,0.0030207129,0.0008452527],"domain_scores_gemma":[0.9752006,0.0120226685,0.0037175962,0.0038565234,0.003282656,0.0019199173],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008837571,0.0010190639,0.0006447929,0.0007209744,0.0022556882,0.003897175,0.001944432,0.0010936408,0.0033758634],"category_scores_gemma":[0.025546,0.0005993616,0.00064225507,0.0011236989,0.0012365469,0.0022190793,0.00291575,0.002549081,0.00069301407],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007333249,0.0025849766,0.02846123,0.0012046562,0.00012526772,0.00046261557,0.020971935,0.009729585,0.020428602,0.01244809,0.007828464,0.89502114],"study_design_scores_gemma":[0.0014921342,0.021915453,0.261321,0.002711559,0.00121837,0.0054934653,0.05292668,0.06544119,0.12428603,0.048036803,0.4139102,0.0012470881],"about_ca_topic_score_codex":0.0048130928,"about_ca_topic_score_gemma":0.0135087,"teacher_disagreement_score":0.008837571,"about_ca_system_score_codex":0.0018408666,"about_ca_system_score_gemma":0.007365954,"threshold_uncertainty_score":0.046738088},"labels":[],"label_agreement":null},{"id":"W4403748876","doi":"10.24908/pceea.2023.17157","title":"Environmental sustainability- and EDI-integrated engineering work: Who is doing it and what skills are important?","year":2024,"lang":"en","type":"article","venue":"Proceedings of the Canadian Engineering Education Association (CEEA)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"University of Toronto","keywords":"Sustainability; Work (physics); Engineering management; Business; Environmental resource management; Engineering; Environmental science; Ecology; Mechanical engineering; Biology","score_opus":0.006065600386752833,"score_gpt":0.23830457296443094,"score_spread":0.23223897257767812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403748876","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97716206,0.0008823137,0.0008098257,0.006470341,0.000029232973,0.00003892627,0.00016708973,0.0000075268545,0.0144327395],"genre_scores_gemma":[0.998085,0.00041722332,0.00037006914,0.00030026832,0.000007279911,0.0000134045495,0.000061339466,0.000003757992,0.000741591],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9944273,0.0011355968,0.00028466928,0.0005127552,0.0022659935,0.0013736667],"domain_scores_gemma":[0.9876758,0.0030789806,0.0029113975,0.00050851196,0.002574607,0.0032507898],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0059130755,0.00022903213,0.00039842,0.0015986512,0.0031077184,0.0048154164,0.0010199365,0.00065396196,0.0018648437],"category_scores_gemma":[0.014416531,0.0002232869,0.0002032145,0.0033154797,0.005570258,0.0023763923,0.0033342394,0.0011947983,0.00019544645],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005300479,0.00012861783,0.8319588,0.00021247684,0.00005081986,0.00014411318,0.072153546,0.00018212243,0.0005207607,0.0037647358,0.0013310753,0.08949998],"study_design_scores_gemma":[0.0000027571512,0.000021800517,0.89902335,0.00021542127,0.000011915262,0.00004635708,0.09413281,0.00021548064,0.00012850211,0.0011848351,0.0050016996,0.000015107605],"about_ca_topic_score_codex":0.5712629,"about_ca_topic_score_gemma":0.78610224,"teacher_disagreement_score":0.5712629,"about_ca_system_score_codex":0.011986105,"about_ca_system_score_gemma":0.025496295,"threshold_uncertainty_score":0.86252403},"labels":[],"label_agreement":null},{"id":"W4403963640","doi":"10.1016/j.geomat.2024.100035","title":"The elephant in the room: How personal and workplace traits shape role stress in the construction industry","year":2024,"lang":"en","type":"article","venue":"GEOMATICA","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Business","score_opus":0.03913988474629026,"score_gpt":0.3132820333823729,"score_spread":0.27414214863608266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403963640","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9995864,0.00003176286,0.00006609684,0.000035102767,0.0000014784328,0.0000013073903,0.0000060434436,4.4515406e-7,0.00027144738],"genre_scores_gemma":[0.99979085,0.00002519443,0.000043969587,0.0000092807095,9.657192e-7,0.000001428853,0.0000071825966,5.5047275e-7,0.000120647004],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994124,0.0003123683,0.000025581694,0.00006520999,0.0000814132,0.000103081744],"domain_scores_gemma":[0.99866056,0.00043434388,0.00034744496,0.00008540822,0.000100068246,0.00037222242],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008081745,0.00018092507,0.00013970507,0.00034003152,0.0004927151,0.0009907085,0.00019502279,0.00025441364,0.0015719037],"category_scores_gemma":[0.001995381,0.00012801735,0.0002433602,0.00023610835,0.0007466965,0.0003892595,0.0007537514,0.0003031855,0.00018633323],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000828624,0.000101807374,0.9848605,0.000018023908,0.00003392128,0.00012383853,0.0063545713,0.000089731235,0.001436303,0.000088430774,0.00006929509,0.0067407945],"study_design_scores_gemma":[0.000001328411,0.00007069208,0.99117345,0.00001056578,0.0000073647943,0.00006490678,0.008197977,0.00012902838,0.0000985814,0.00006399556,0.00017668022,0.0000055174964],"about_ca_topic_score_codex":0.0030990383,"about_ca_topic_score_gemma":0.00881183,"teacher_disagreement_score":0.0030990383,"about_ca_system_score_codex":0.00024892332,"about_ca_system_score_gemma":0.00043184552,"threshold_uncertainty_score":0.006161988},"labels":[],"label_agreement":null},{"id":"W4404282310","doi":"10.3390/engproc2024076078","title":"Enhancing Construction Project Performance Through Integrated and Optimized Supply Chain Management","year":2024,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina; École de Technologie Supérieure","funders":"","keywords":"Supply chain management; Supply chain; Computer science; Project management; Systems engineering; Process management; Business; Engineering","score_opus":0.04816899399878146,"score_gpt":0.3375114882530776,"score_spread":0.28934249425429615,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404282310","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18746316,0.00023139933,0.80637294,0.00020459243,0.000010690801,0.00010314569,0.00006388784,0.0002605156,0.005289689],"genre_scores_gemma":[0.9381377,0.00014384933,0.060877964,0.000013614659,0.0000032162343,0.00006698712,0.00004751702,0.000023113533,0.0006860403],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988953,0.00041648425,0.00003936173,0.00011805384,0.00035458143,0.00017613791],"domain_scores_gemma":[0.9992236,0.00024427508,0.00025589924,0.000073333926,0.00013709076,0.0000657943],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015975183,0.0007267237,0.0005103146,0.00081253535,0.00039713774,0.0020357098,0.00074979756,0.0006429777,0.0009698919],"category_scores_gemma":[0.002047403,0.00047731734,0.00035332373,0.0011512432,0.00048626377,0.0018785686,0.0013273787,0.00061839947,0.00021050498],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022204458,0.000043681765,0.00077286945,0.000020859556,0.0000099446925,0.00001688411,0.000028900975,0.98100454,0.0023407459,0.0017497127,0.00010160229,0.013888082],"study_design_scores_gemma":[0.0000070940578,0.00009132048,0.00047790367,0.000008832959,0.000010977269,0.000010787456,0.000041586114,0.99437743,0.0021846227,0.0024425918,0.00033761025,0.00000914291],"about_ca_topic_score_codex":0.0031151874,"about_ca_topic_score_gemma":0.0045187883,"teacher_disagreement_score":0.0031151874,"about_ca_system_score_codex":0.0013948174,"about_ca_system_score_gemma":0.0025034642,"threshold_uncertainty_score":0.010120213},"labels":[],"label_agreement":null},{"id":"W4404375780","doi":"10.1108/978-1-83797-799-420241014","title":"Project Management Essentials","year":2024,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Computer science","score_opus":0.13462515215770535,"score_gpt":0.3928823232872922,"score_spread":0.2582571711295869,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404375780","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00046521708,0.001757542,0.005728826,0.00675724,0.00073698675,0.00004482296,0.000041898416,0.00007744764,0.9843901],"genre_scores_gemma":[0.018666787,0.0029016174,0.004188994,0.0025750825,0.00049070443,0.0001235904,0.00007193965,0.000110987494,0.9708702],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99764556,0.0005843238,0.00006577414,0.00018801427,0.0013162214,0.0002001451],"domain_scores_gemma":[0.9986811,0.0003068082,0.000058310347,0.00021117853,0.00051480916,0.00022773822],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021152182,0.00060894125,0.0003516526,0.0010053349,0.0027498142,0.0068560787,0.0009147056,0.0016646627,0.048528094],"category_scores_gemma":[0.0044335653,0.00034489643,0.00023482663,0.0010346343,0.0035134212,0.004517525,0.003719462,0.003529325,0.022385482],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005779753,0.000024816092,0.00010363091,0.00007137012,0.000001838287,0.000054775937,0.0013733656,0.00021814153,0.00016694449,0.6885135,0.20612024,0.10334562],"study_design_scores_gemma":[0.0000010036536,0.0000049664013,0.00013076048,0.00009966764,7.7823137e-7,0.00005394375,0.0003017128,0.00007328992,0.000056626446,0.07759941,0.92167497,0.0000028565537],"about_ca_topic_score_codex":0.0034576303,"about_ca_topic_score_gemma":0.0051920842,"teacher_disagreement_score":0.048528094,"about_ca_system_score_codex":0.0025227796,"about_ca_system_score_gemma":0.005758278,"threshold_uncertainty_score":0.16234267},"labels":[],"label_agreement":null},{"id":"W4404436159","doi":"10.1002/cjas.1772","title":"Project management challenges in client‐consultant decision‐making: A case for the Ghanaian mining construction industry","year":2024,"lang":"en","type":"article","venue":"Canadian Journal of Administrative Sciences / Revue Canadienne des Sciences de l Administration","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"Dalhousie University","keywords":"Business; Construction industry; Mining industry; Process management; Engineering management; Knowledge management; Operations management; Engineering; Construction engineering; Computer science; Mining engineering","score_opus":0.3317363053078861,"score_gpt":0.43370556652927406,"score_spread":0.10196926122138794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404436159","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9461765,0.00041770336,0.010017399,0.01809365,0.000052064646,0.00017537766,0.000038200626,0.000024460223,0.025004566],"genre_scores_gemma":[0.99504167,0.0001735345,0.0029071514,0.00029314533,0.000011922944,0.00004615719,0.000007487155,0.0000075750722,0.001511362],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.98416084,0.011337612,0.00031440685,0.00045729612,0.0015005406,0.0022293467],"domain_scores_gemma":[0.96255165,0.02676183,0.003553946,0.0009032272,0.0022542037,0.0039750696],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010739584,0.00041945215,0.00035719993,0.0010732731,0.01217906,0.0061095026,0.0015907147,0.0032402603,0.0052689686],"category_scores_gemma":[0.020717446,0.00040300717,0.00028156766,0.0018898345,0.0059795906,0.0023267039,0.0045498484,0.00283779,0.0005191232],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006844787,0.0012583956,0.07938627,0.0007456999,0.000093795716,0.101571865,0.49246064,0.017238267,0.0051532015,0.1667582,0.020679228,0.11396996],"study_design_scores_gemma":[0.00008479382,0.00023388848,0.015342315,0.000623226,0.000028831519,0.010032037,0.8438395,0.020019736,0.0015782407,0.033039268,0.07508021,0.000097932265],"about_ca_topic_score_codex":0.017343428,"about_ca_topic_score_gemma":0.03186693,"teacher_disagreement_score":0.017343428,"about_ca_system_score_codex":0.009325128,"about_ca_system_score_gemma":0.010968264,"threshold_uncertainty_score":0.0676589},"labels":[],"label_agreement":null},{"id":"W4404492734","doi":"10.1007/978-3-031-67398-6_149","title":"Developing Under Pressure: Mitigating Technology Risk in Accelerated Project Timelines","year":2024,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hatch (Canada)","funders":"","keywords":"Timeline; Computer science; Risk analysis (engineering); Environmental science; Business; Mathematics; Statistics","score_opus":0.1625335028130088,"score_gpt":0.3906647664285257,"score_spread":0.22813126361551692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404492734","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031911217,0.018831206,0.22973257,0.011752184,0.0009149036,0.00016198204,0.00012220295,0.0005221101,0.70605165],"genre_scores_gemma":[0.4604543,0.03277731,0.12912738,0.0013312552,0.00092120754,0.0002229537,0.00016478628,0.00040805966,0.37459266],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99913496,0.00026086532,0.000018664896,0.000050568826,0.00047224038,0.000062704414],"domain_scores_gemma":[0.9987122,0.0007632132,0.00015167288,0.000066569555,0.00024234022,0.00006398415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001037261,0.0006600869,0.0003041687,0.0007736621,0.00068116526,0.00400292,0.0010500061,0.0010908559,0.008577713],"category_scores_gemma":[0.003373828,0.00027288028,0.00026175723,0.0009522004,0.0012076457,0.0027981955,0.0012978733,0.0018637097,0.0015540222],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004729737,0.00013222943,0.0014882551,0.00032445573,0.00002443543,0.00035368768,0.0022317313,0.019006453,0.0035892527,0.40846482,0.044971406,0.51936597],"study_design_scores_gemma":[0.000017159855,0.00027949453,0.003679295,0.00096216315,0.000043059226,0.0006335245,0.0043679476,0.037485186,0.006720307,0.43159848,0.5141469,0.00006645855],"about_ca_topic_score_codex":0.0019885122,"about_ca_topic_score_gemma":0.003878461,"teacher_disagreement_score":0.008577713,"about_ca_system_score_codex":0.0011369582,"about_ca_system_score_gemma":0.0020971638,"threshold_uncertainty_score":0.028695285},"labels":[],"label_agreement":null},{"id":"W4404494272","doi":"10.1007/978-3-031-67398-6_161","title":"Project Implementation Best Practices for Metallurgical Furnace Rebuilds and Upgrades","year":2024,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hatch (Canada)","funders":"","keywords":"Metallurgy; Engineering; Waste management; Materials science","score_opus":0.3463683174784255,"score_gpt":0.5097656117357049,"score_spread":0.1633972942572794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404494272","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024432026,0.0134159,0.3424161,0.039936993,0.0012660141,0.0013705883,0.00057365245,0.0042014746,0.5723872],"genre_scores_gemma":[0.23760237,0.010585992,0.56079733,0.002228741,0.00018538804,0.00095975684,0.00125009,0.0011725345,0.18521784],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.97897583,0.0070889643,0.0010867735,0.00084591436,0.010682546,0.0013200174],"domain_scores_gemma":[0.9897176,0.0027780007,0.00085685874,0.0014552393,0.0044217715,0.0007704602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016324952,0.0009714188,0.0004734983,0.0029379844,0.0020347445,0.009447208,0.0034744178,0.0025745204,0.010191972],"category_scores_gemma":[0.01690037,0.0007312594,0.0005567911,0.0028318334,0.0015417162,0.0047534695,0.0035699678,0.0029278286,0.0035015445],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028088556,0.0003242284,0.0016194406,0.0005538355,0.000026865677,0.00019334196,0.0026160365,0.007976341,0.001217001,0.091142975,0.08959438,0.80470747],"study_design_scores_gemma":[0.000052230043,0.0003708756,0.010444559,0.005162984,0.00008356914,0.00070923095,0.009447246,0.016667131,0.007283836,0.1357971,0.81382984,0.00015151623],"about_ca_topic_score_codex":0.012120957,"about_ca_topic_score_gemma":0.027863558,"teacher_disagreement_score":0.016324952,"about_ca_system_score_codex":0.0060750633,"about_ca_system_score_gemma":0.015762383,"threshold_uncertainty_score":0.08633566},"labels":[],"label_agreement":null},{"id":"W4404494445","doi":"10.1007/978-3-031-67398-6_155","title":"Success Factors in Fast-Track Projects","year":2024,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hatch (Canada)","funders":"","keywords":"Track (disk drive); Fast track; Computer science; Operating system; Medicine","score_opus":0.11522665709156255,"score_gpt":0.3587952806022844,"score_spread":0.24356862351072184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404494445","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.098771,0.032300517,0.021137534,0.0030554906,0.00039757538,0.000091451315,0.0005048945,0.00014684345,0.8435946],"genre_scores_gemma":[0.67192686,0.026130455,0.0068118353,0.00018175878,0.00033678525,0.00013411348,0.0005922854,0.00013788014,0.293748],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99937195,0.00019947492,0.000020580723,0.000042434633,0.00030650175,0.0000589829],"domain_scores_gemma":[0.9969779,0.0024093431,0.00018045412,0.000035462734,0.00026111066,0.00013575755],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008525107,0.00069914426,0.00036237115,0.0017143127,0.000697441,0.0029258775,0.0004763969,0.00047824573,0.019223826],"category_scores_gemma":[0.003790744,0.00023285084,0.00022412579,0.0040833275,0.00094643066,0.0013478389,0.0006902487,0.0007668348,0.0020702325],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000072361065,0.000231928,0.024751037,0.00048847287,0.000032044318,0.0003526131,0.0047142366,0.0056247255,0.000528926,0.35120252,0.06524496,0.54675627],"study_design_scores_gemma":[0.000017969884,0.00039912993,0.27521917,0.0016543057,0.00006341296,0.0007386348,0.021797778,0.014111666,0.0011850486,0.37822416,0.30647033,0.00011840877],"about_ca_topic_score_codex":0.0082866205,"about_ca_topic_score_gemma":0.016393112,"teacher_disagreement_score":0.019223826,"about_ca_system_score_codex":0.0016157365,"about_ca_system_score_gemma":0.0015234222,"threshold_uncertainty_score":0.06431013},"labels":[],"label_agreement":null},{"id":"W4404589801","doi":"10.4108/eetsis.6061","title":"Exploring the Landscape of Multicriteria Decision Making in Software Project Management: Trends, Challenges, and Future Directions","year":2024,"lang":"en","type":"article","venue":"ICST Transactions on Scalable Information Systems","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University Canada West","funders":"","keywords":"Multiple-criteria decision analysis; Scopus; Management science; Computer science; Software; Software project management; Project management; Engineering management; Process management; Systems engineering; Engineering; Software development; Operations research; Software construction","score_opus":0.10678467297021439,"score_gpt":0.32901399859795466,"score_spread":0.22222932562774028,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404589801","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01085783,0.90794104,0.023761094,0.04793144,0.00069159304,0.00010263172,0.000095294956,0.000040699717,0.008578445],"genre_scores_gemma":[0.13136317,0.8221036,0.040291123,0.0043552504,0.0008979557,0.00021518097,0.000108727116,0.00003334789,0.00063151424],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9707916,0.018839125,0.0023962844,0.0017785543,0.005544625,0.00064991665],"domain_scores_gemma":[0.8230054,0.14822963,0.006944697,0.0023115566,0.018364405,0.0011443723],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.040119894,0.000759015,0.0016220949,0.011895972,0.0016720297,0.010494695,0.002059945,0.0026224446,0.002626499],"category_scores_gemma":[0.06537042,0.0007796182,0.0015913175,0.017691504,0.005360733,0.00956041,0.0031440132,0.0033880472,0.00032074534],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009106975,0.00010071201,0.0043270863,0.043015078,0.0003780219,0.0002951783,0.008524125,0.004850161,0.0008768652,0.13002382,0.009151378,0.7983664],"study_design_scores_gemma":[0.00003846168,0.0005936348,0.009930795,0.14151356,0.00054057117,0.0014706157,0.03456012,0.010328436,0.0021246697,0.2507413,0.54787314,0.00028465717],"about_ca_topic_score_codex":0.007273863,"about_ca_topic_score_gemma":0.012547088,"teacher_disagreement_score":0.040119894,"about_ca_system_score_codex":0.0077683465,"about_ca_system_score_gemma":0.017405039,"threshold_uncertainty_score":0.21217686},"labels":[],"label_agreement":null},{"id":"W4404738988","doi":"10.1061/jaeied.aeeng-1868","title":"Off-Site Construction Resilience: A Strategic Response to Inflation Challenges in Construction in Postpandemic Canada","year":2024,"lang":"en","type":"article","venue":"Journal of Architectural Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; École de Technologie Supérieure","funders":"","keywords":"Resilience (materials science); Inflation (cosmology); Environmental resource management; Engineering; Business; Architectural engineering; Environmental planning; Environmental science","score_opus":0.04341309251986848,"score_gpt":0.30290432254052696,"score_spread":0.2594912300206585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404738988","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9797504,0.00015649303,0.0004920101,0.0019517719,0.000018473647,0.00007729292,0.000051116156,0.000019692869,0.01748281],"genre_scores_gemma":[0.9938459,0.00015426548,0.0005331346,0.0001576451,0.000003210894,0.00001068551,0.000041986143,0.000007660865,0.0052454737],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99810755,0.00022877035,0.000018994719,0.0000913069,0.00044712232,0.0011062006],"domain_scores_gemma":[0.998538,0.00010948233,0.0001344328,0.000035381374,0.00034337855,0.0008392929],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009219882,0.00028734625,0.00021278384,0.0009942652,0.009954034,0.0031767797,0.0015569606,0.00070171285,0.0027194484],"category_scores_gemma":[0.0019135864,0.00023819966,0.00025902907,0.0011695197,0.0035526832,0.0004879476,0.0039054689,0.0012654159,0.00017374482],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007082665,0.0013323128,0.44869483,0.00035795962,0.0001107332,0.008405863,0.16762817,0.00681437,0.012245757,0.03331954,0.02292195,0.29746023],"study_design_scores_gemma":[0.000030238214,0.00045007933,0.51876426,0.00021163619,0.000055045806,0.00066335604,0.367934,0.0062377155,0.002010555,0.0032116172,0.100329675,0.00010177396],"about_ca_topic_score_codex":0.9436292,"about_ca_topic_score_gemma":0.98791677,"teacher_disagreement_score":0.05962694,"about_ca_system_score_codex":0.05962694,"about_ca_system_score_gemma":0.11674892,"threshold_uncertainty_score":0.4326257},"labels":[],"label_agreement":null},{"id":"W4404995844","doi":"10.2139/ssrn.5044048","title":"Cost Overruns of Infrastructure Projects – Distributions, Causes and Remedies","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Engineering Link (Canada)","funders":"","keywords":"Business; Forensic engineering; Risk analysis (engineering); Environmental science; Finance; Engineering","score_opus":0.05556754367078169,"score_gpt":0.35895210831221036,"score_spread":0.30338456464142866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404995844","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9645144,0.0037952808,0.008094481,0.004710086,0.000057282145,0.000049999795,0.00045682074,0.000083847845,0.018237919],"genre_scores_gemma":[0.99794096,0.00042158648,0.0007369419,0.0000427054,0.000038124646,0.0000070990864,0.00005981911,0.000009893058,0.00074281805],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9943772,0.0015737411,0.00047372526,0.0005667508,0.002201726,0.0008068789],"domain_scores_gemma":[0.973974,0.0085139675,0.010541196,0.001443544,0.00476888,0.0007584223],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004084918,0.00029923808,0.00052352564,0.0033495096,0.0006671485,0.002149121,0.0009089845,0.0009959927,0.0029026265],"category_scores_gemma":[0.02526811,0.0004057345,0.0004323814,0.0037980927,0.0013294752,0.0022587392,0.001463641,0.0012736868,0.00026147036],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00064842164,0.00031481587,0.46560356,0.00051836495,0.0003136959,0.0014916052,0.00161136,0.10205357,0.0030805666,0.12119488,0.008081991,0.29508728],"study_design_scores_gemma":[0.00004514651,0.00033438703,0.7648545,0.00034942708,0.00014363274,0.0012201474,0.004046602,0.082421914,0.0026698879,0.12762143,0.01616339,0.00012966897],"about_ca_topic_score_codex":0.006708507,"about_ca_topic_score_gemma":0.008155142,"teacher_disagreement_score":0.006708507,"about_ca_system_score_codex":0.0030492565,"about_ca_system_score_gemma":0.001575293,"threshold_uncertainty_score":0.022123992},"labels":[],"label_agreement":null},{"id":"W4405119311","doi":"10.21275/mr211214024240","title":"Development of Motivational Strategies to Enhance Productivity in Small and Medium Scale Construction Firms in Ghana","year":2021,"lang":"en","type":"article","venue":"International Journal of Science and Research (IJSR)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Thinkpath Engineering Services (Canada)","funders":"","keywords":"Productivity; Scale (ratio); Industrial organization; Business; Natural resource economics; Economics; Economic growth; Geography","score_opus":0.12250370005335769,"score_gpt":0.4543683233151278,"score_spread":0.3318646232617701,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405119311","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9957558,0.00034621832,0.00055553246,0.0006937901,0.000008996412,0.00013779721,0.000014378585,0.000005574345,0.0024819646],"genre_scores_gemma":[0.9972325,0.00027880908,0.0018374342,0.00005763441,0.0000023411626,0.00006109124,0.000008557608,0.0000010245276,0.00052054354],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9994448,0.0002903751,0.000012825456,0.000024153045,0.00006678244,0.00016098413],"domain_scores_gemma":[0.99840313,0.00051739835,0.00032097925,0.000024680128,0.00010825683,0.0006255516],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013424648,0.0002936857,0.00019007956,0.0004895626,0.000651924,0.0010068004,0.0003194828,0.00035078052,0.0014784695],"category_scores_gemma":[0.0023403408,0.00013134816,0.00020652742,0.00038537325,0.00043711206,0.00031819122,0.0006487401,0.00044985328,0.00013756356],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005985492,0.008448442,0.386252,0.0020063221,0.000101186815,0.0014971552,0.0342451,0.0017294951,0.010931304,0.0072587267,0.0028621433,0.5440695],"study_design_scores_gemma":[0.00024305838,0.0038049005,0.9035433,0.0009670579,0.00008219552,0.00030995277,0.06150339,0.0033483843,0.0027053505,0.0036208914,0.019824265,0.000047165235],"about_ca_topic_score_codex":0.0027853213,"about_ca_topic_score_gemma":0.008939083,"teacher_disagreement_score":0.0027853213,"about_ca_system_score_codex":0.0015226911,"about_ca_system_score_gemma":0.0034181804,"threshold_uncertainty_score":0.011047959},"labels":[],"label_agreement":null},{"id":"W4405174954","doi":"10.31435/ijitss.4(44).2024.3034","title":"THE SYNERGY OF OPTIMIZING PROJECT MANAGEMENT PRACTICES FOR QUALITY MANAGEMENT IN RESIDENTIAL BUILDINGS","year":2024,"lang":"en","type":"article","venue":"International Journal of Innovative Technologies in Social Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Nexus (standard); Multidisciplinary approach; Context (archaeology); Publishing; Quality (philosophy); China; Field (mathematics); Scopus; Quality assurance; Conversation; Computer science; Knowledge management; Management science; Engineering management; Sociology; Engineering; Political science; Operations management; Geography; Social science","score_opus":0.13947858323089213,"score_gpt":0.5121554906012268,"score_spread":0.37267690737033465,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405174954","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69703716,0.14548758,0.016833385,0.004943327,0.00016598949,0.0005003715,0.0033180455,0.00015705799,0.13155703],"genre_scores_gemma":[0.9664927,0.025305232,0.0066218222,0.00007724695,0.00007947013,0.00009629477,0.00048837916,0.00001888645,0.0008199211],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98188883,0.006742298,0.0024037124,0.0008603647,0.0075709494,0.00053383544],"domain_scores_gemma":[0.9357315,0.044166833,0.011609083,0.001602355,0.0061316714,0.00075854466],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01260094,0.0003913269,0.0007988909,0.026803816,0.0012196224,0.00793477,0.00071445206,0.0006706623,0.002192056],"category_scores_gemma":[0.057683825,0.00019221246,0.00060065975,0.059625562,0.0011209623,0.0038262315,0.0020282827,0.00033568311,0.00021433749],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030574907,0.00018101011,0.14447781,0.024585022,0.0011153506,0.0004633291,0.006939492,0.010211274,0.0019282626,0.03622695,0.004652583,0.76891315],"study_design_scores_gemma":[0.000094833944,0.0010472133,0.7010486,0.022120876,0.0030969966,0.0019214059,0.03870761,0.01708762,0.0093173385,0.04019089,0.16511282,0.0002538067],"about_ca_topic_score_codex":0.0034506675,"about_ca_topic_score_gemma":0.005322058,"teacher_disagreement_score":0.026803816,"about_ca_system_score_codex":0.0041250573,"about_ca_system_score_gemma":0.0066755177,"threshold_uncertainty_score":0.06664097},"labels":[],"label_agreement":null},{"id":"W4405196173","doi":"10.1108/ijmpb-05-2024-0107","title":"Governance of ESG implementations: governance dimensions and their structural implementation","year":2024,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Project governance; Corporate governance; Implementation; Hierarchy; Multi-level governance; Information governance; Knowledge management; Process management; Business; Context (archaeology); Conceptual framework; Political science; Sociology; Computer science; Information system","score_opus":0.05238590523073028,"score_gpt":0.3976157776776198,"score_spread":0.3452298724468895,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405196173","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6471213,0.018805534,0.17055152,0.03259229,0.00034653477,0.002009894,0.0011250521,0.00051650056,0.12693135],"genre_scores_gemma":[0.97641605,0.002530134,0.019166287,0.00042670284,0.000032975084,0.00037507564,0.00019709552,0.000029842799,0.00082585885],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.95870245,0.027381653,0.004262504,0.0022160362,0.0059199897,0.0015173445],"domain_scores_gemma":[0.9268452,0.035684474,0.017427718,0.00794477,0.010307736,0.0017901553],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.030789314,0.0003289852,0.00041424777,0.0050895796,0.0017109669,0.008072042,0.0008588024,0.0009318441,0.0019734607],"category_scores_gemma":[0.064283386,0.00040628793,0.00052732683,0.0068986155,0.0075131725,0.0059565553,0.004065021,0.0013219059,0.0002129846],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007996261,0.00016754003,0.22539721,0.0048684306,0.00032696867,0.0003851071,0.04331279,0.0053513227,0.0024524336,0.3353676,0.0046434514,0.3776472],"study_design_scores_gemma":[0.00008421939,0.0004885065,0.31720614,0.014802782,0.0004622575,0.0010190816,0.14213035,0.00581809,0.004108082,0.3428352,0.17083411,0.00021127866],"about_ca_topic_score_codex":0.0038561253,"about_ca_topic_score_gemma":0.004402775,"teacher_disagreement_score":0.030789314,"about_ca_system_score_codex":0.0049324236,"about_ca_system_score_gemma":0.011440412,"threshold_uncertainty_score":0.16283143},"labels":[],"label_agreement":null},{"id":"W4405250345","doi":"10.1016/j.autcon.2024.105928","title":"Entropy-centric framework for understanding and managing project dynamics in construction","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Entropy (arrow of time); Computer science; Systems engineering; Engineering; Construction engineering; Engineering management; Physics","score_opus":0.08513719824578415,"score_gpt":0.37478403327065835,"score_spread":0.2896468350248742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405250345","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009912181,0.00040249425,0.9822939,0.00067459384,0.000046199802,0.00009517948,0.00015135683,0.000108716624,0.006315382],"genre_scores_gemma":[0.6157304,0.0013345679,0.378409,0.00020934339,0.00023420497,0.00054856995,0.000341011,0.0000804287,0.0031124935],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99842596,0.00078668166,0.00012652569,0.00023349535,0.00031935945,0.00010808372],"domain_scores_gemma":[0.9975026,0.0014365918,0.00040898882,0.0002259435,0.00027144526,0.0001544464],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031680323,0.0011415961,0.0006872634,0.0039700386,0.00089644926,0.003166247,0.0011464406,0.0007858325,0.0023459184],"category_scores_gemma":[0.0049583404,0.0004380623,0.0012566258,0.0018417237,0.003182998,0.004257204,0.0024718118,0.0013444423,0.00022322602],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000385387,0.000059405167,0.005803287,0.00021237726,0.00010562862,0.00023479709,0.0011383081,0.31884086,0.0015590346,0.6322117,0.001135357,0.038660817],"study_design_scores_gemma":[0.000011688685,0.0000786086,0.0025313199,0.00016285083,0.00004653051,0.00009461305,0.00078686466,0.51176786,0.0007592616,0.47399652,0.00970921,0.00005469395],"about_ca_topic_score_codex":0.005572279,"about_ca_topic_score_gemma":0.0054070414,"teacher_disagreement_score":0.005572279,"about_ca_system_score_codex":0.0029737798,"about_ca_system_score_gemma":0.0028960705,"threshold_uncertainty_score":0.021576405},"labels":[],"label_agreement":null},{"id":"W4405397789","doi":"10.5267/j.jpm.2024.11.001","title":"Application of reinforcement learning for integrating project risk analysis and risk response planning: A case study on construction projects","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reinforcement; Reinforcement learning; Project risk management; Risk analysis (engineering); Computer science; Engineering; Project management; Business; Systems engineering; Project management triangle; Artificial intelligence; Structural engineering","score_opus":0.07255034078815523,"score_gpt":0.40893634709894394,"score_spread":0.33638600631078874,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405397789","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9352648,0.00019132895,0.059726562,0.00037358783,0.000019915096,0.00018820466,0.00007887458,0.00009636675,0.0040602726],"genre_scores_gemma":[0.97058773,0.00011146045,0.028038364,0.000017079488,0.00000684197,0.000078332974,0.000041077357,0.000010780922,0.0011084448],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986217,0.000921818,0.000047670535,0.00010598869,0.000170453,0.00013245858],"domain_scores_gemma":[0.99346066,0.005383909,0.00029459273,0.00022124489,0.0003681247,0.00027153132],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026146886,0.00069162983,0.00065438193,0.00081865484,0.000864745,0.000906232,0.001090737,0.0016444151,0.0012727386],"category_scores_gemma":[0.0050453492,0.00034268544,0.0006516398,0.00081218936,0.0007462007,0.0009378935,0.00095582986,0.001159074,0.00010239804],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033653376,0.0015272646,0.009826567,0.00017317839,0.00007466473,0.0016597513,0.0006289161,0.94418037,0.0021910535,0.0052421098,0.0005571208,0.033602502],"study_design_scores_gemma":[0.00006819833,0.00041811558,0.001984911,0.000016583703,0.000025185924,0.00012088541,0.00042004554,0.99193186,0.0017701022,0.0023927426,0.000828539,0.00002291838],"about_ca_topic_score_codex":0.010671876,"about_ca_topic_score_gemma":0.009919152,"teacher_disagreement_score":0.010671876,"about_ca_system_score_codex":0.0012902692,"about_ca_system_score_gemma":0.0013396243,"threshold_uncertainty_score":0.021219552},"labels":[],"label_agreement":null},{"id":"W4405397884","doi":"10.5267/j.jpm.2024.10.001","title":"Influence of information technology on project risk management: The mediating role of risk identification","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"King Khalid University","keywords":"Identification (biology); Risk management; Risk analysis (engineering); Knowledge management; Business; Process management; Computer science","score_opus":0.01899984194348094,"score_gpt":0.3291685218807655,"score_spread":0.3101686799372846,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405397884","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9747395,0.00058580114,0.004385348,0.00084395765,0.000019498355,0.00008736265,0.000034739693,0.000025976975,0.01927778],"genre_scores_gemma":[0.9978551,0.00030173818,0.0012895985,0.000033626722,0.000008013261,0.000023114877,0.000009779142,0.0000035336595,0.00047553086],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9910924,0.005952823,0.00039573654,0.0004280963,0.0014204006,0.00071053836],"domain_scores_gemma":[0.9433662,0.045290686,0.0056580026,0.0012128983,0.0023241043,0.0021481635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0054906365,0.0007337263,0.00032161342,0.0016094208,0.0008391656,0.003308857,0.0004268855,0.000635534,0.0045997156],"category_scores_gemma":[0.031369958,0.00030675327,0.0006486854,0.00095532223,0.0013915714,0.00204921,0.002913141,0.0009791235,0.0002854496],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054492377,0.0019731184,0.75524276,0.00081986166,0.00064313674,0.0016859185,0.027050756,0.0037661593,0.0073601664,0.018733487,0.0006319921,0.18154772],"study_design_scores_gemma":[0.00009634086,0.0021875978,0.9053133,0.0015416787,0.0015927617,0.0013617702,0.040952735,0.014088832,0.010379353,0.011276727,0.011074082,0.00013480458],"about_ca_topic_score_codex":0.0019783154,"about_ca_topic_score_gemma":0.0016342751,"teacher_disagreement_score":0.0054906365,"about_ca_system_score_codex":0.0010888444,"about_ca_system_score_gemma":0.0036390903,"threshold_uncertainty_score":0.029037595},"labels":[],"label_agreement":null},{"id":"W4405477243","doi":"10.24294/jipd9664","title":"Methodological approaches in prioritizing municipal projects: A case study of the municipality of the holy capital (Makkah)","year":2024,"lang":"en","type":"article","venue":"Journal of Infrastructure Policy and Development","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Employment and Social Development Canada","funders":"","keywords":"Capital city; Capital (architecture); Environmental planning; Business; Geography; Archaeology","score_opus":0.3746583956089743,"score_gpt":0.4365100276168244,"score_spread":0.0618516320078501,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405477243","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96491617,0.00072924123,0.019265875,0.0022261536,0.000030378707,0.00086424383,0.00010519622,0.000031530974,0.011831106],"genre_scores_gemma":[0.97026694,0.00064653147,0.026807707,0.000112037895,0.000007797951,0.00047394948,0.00005624316,0.000012961032,0.0016158803],"study_design_codex":"qualitative","study_design_gemma":"not_applicable","domain_scores_codex":[0.9873368,0.0094158165,0.0005491984,0.0005035921,0.0013714958,0.0008231082],"domain_scores_gemma":[0.9881788,0.006867255,0.0017873538,0.0006226522,0.0016638566,0.00088014564],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012599942,0.00059652864,0.00040463326,0.002780182,0.006718622,0.0045063705,0.0018066905,0.0013850532,0.00176418],"category_scores_gemma":[0.017708706,0.000421905,0.00048550323,0.0059705814,0.0024660972,0.0020860238,0.0036883065,0.0011969649,0.00022638752],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030708406,0.001577973,0.18539579,0.0031062758,0.0003196145,0.027064366,0.39533302,0.029031528,0.00673333,0.053497434,0.0047671935,0.2928664],"study_design_scores_gemma":[0.00006224823,0.0005908376,0.068831734,0.0011791069,0.00012263794,0.0026433256,0.8310534,0.01822844,0.0024895186,0.010701172,0.06395517,0.0001424284],"about_ca_topic_score_codex":0.02277653,"about_ca_topic_score_gemma":0.069933824,"teacher_disagreement_score":0.02277653,"about_ca_system_score_codex":0.011075743,"about_ca_system_score_gemma":0.012307948,"threshold_uncertainty_score":0.08036059},"labels":[],"label_agreement":null},{"id":"W4405495768","doi":"10.1007/978-3-031-61503-0_5","title":"Application of Topsis Decision-Making Technique in Selecting a Sustainable Project Financing Model for Infrastructure in China","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"TOPSIS; China; Business; Decision-making models; Decision model; Finance; Computer science; Operations research; Engineering; Geography; Artificial intelligence","score_opus":0.014117128112646026,"score_gpt":0.2975350364235743,"score_spread":0.2834179083109283,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405495768","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4922214,0.0007730952,0.4831426,0.0008771409,0.00011292186,0.0008844513,0.0005000535,0.0003974789,0.021090873],"genre_scores_gemma":[0.90835345,0.00027776026,0.08882732,0.000022781258,0.000013443545,0.00025150905,0.00022277795,0.000018474038,0.0020124705],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9968501,0.0016170066,0.00022196841,0.00027081327,0.0007931699,0.00024691265],"domain_scores_gemma":[0.99868304,0.00081592205,0.00009037676,0.000040364823,0.00031063298,0.000059715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003801331,0.0008617982,0.0009512854,0.0030902722,0.0012787301,0.0029491447,0.0010679781,0.0007253378,0.0025812725],"category_scores_gemma":[0.0035211374,0.0005849657,0.0016279287,0.0035095382,0.0005224419,0.0014651533,0.00079508795,0.0007255991,0.00014439762],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031105586,0.00031529658,0.012771005,0.0006658353,0.00048556452,0.00047862504,0.0008996654,0.71291643,0.0038507357,0.02312882,0.0038971938,0.24027976],"study_design_scores_gemma":[0.000048020782,0.00018362906,0.004150915,0.000060090417,0.00016391384,0.000041612384,0.0008130679,0.98447925,0.0012409422,0.007528385,0.0012429354,0.000047118036],"about_ca_topic_score_codex":0.031210473,"about_ca_topic_score_gemma":0.032952502,"teacher_disagreement_score":0.031210473,"about_ca_system_score_codex":0.004102958,"about_ca_system_score_gemma":0.0058259084,"threshold_uncertainty_score":0.062057614},"labels":[],"label_agreement":null},{"id":"W4405920338","doi":"10.1504/ijplm.2024.143538","title":"Engineering change management: comparing theory to a case study from aerospace","year":2024,"lang":"en","type":"article","venue":"International Journal of Product Lifecycle Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Object Research Systems (Canada)","funders":"","keywords":"Aerospace; Engineering; Systems engineering; Aerospace engineering","score_opus":0.110443278220811,"score_gpt":0.39512978708701174,"score_spread":0.2846865088662007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405920338","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.853285,0.0025265834,0.05692278,0.008007889,0.00014966991,0.0014348936,0.00020294786,0.000105228435,0.07736497],"genre_scores_gemma":[0.958993,0.0018916604,0.035613507,0.000796767,0.000031783686,0.000804713,0.00023563081,0.000031252097,0.0016016614],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9836294,0.012488567,0.00061584916,0.00066380634,0.0020477986,0.00055464735],"domain_scores_gemma":[0.9150281,0.077146,0.0018021904,0.0021457088,0.0031479506,0.000730072],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0140022775,0.00045703462,0.0006076344,0.0068526766,0.0030154726,0.0059174914,0.002438892,0.0026528614,0.0040073995],"category_scores_gemma":[0.033614922,0.00036505456,0.0007239735,0.004677922,0.0065354276,0.0047136513,0.003954748,0.001929023,0.0004846894],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00070656947,0.0071629426,0.07270083,0.004426797,0.00016556123,0.0060005374,0.2705138,0.016365765,0.0035161825,0.3035383,0.0067420155,0.30816075],"study_design_scores_gemma":[0.00052765553,0.004923162,0.059971657,0.008450015,0.00031973133,0.002526449,0.6459099,0.06957476,0.00555959,0.0978016,0.10424772,0.0001876707],"about_ca_topic_score_codex":0.006335697,"about_ca_topic_score_gemma":0.010176067,"teacher_disagreement_score":0.0140022775,"about_ca_system_score_codex":0.0103482045,"about_ca_system_score_gemma":0.0054636854,"threshold_uncertainty_score":0.075081825},"labels":[],"label_agreement":null},{"id":"W4406645655","doi":"10.5539/ibr.v18n1p14","title":"Project Governance Practices: Influence on the Appropriation and Sustainability of the Values of Infrastructure Projects","year":2025,"lang":"en","type":"article","venue":"International Business Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Appropriation; Business; Corporate governance; Sustainability; Environmental resource management; Environmental economics; Finance; Economics","score_opus":0.10691456974346801,"score_gpt":0.4618184418340191,"score_spread":0.3549038720905511,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406645655","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9856464,0.00011669885,0.0011792379,0.00027751375,0.0000050500057,0.000039803886,0.00001786388,0.000007513544,0.012709869],"genre_scores_gemma":[0.99942756,0.000041847972,0.00018852443,0.0000086964055,0.0000013466358,0.000013526101,0.000005622446,0.000002155901,0.0003107667],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9800331,0.015561978,0.0005646292,0.0007223037,0.0019150006,0.0012029995],"domain_scores_gemma":[0.95336187,0.030598426,0.0081614,0.0020539274,0.0032257915,0.0025985625],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013016386,0.00015641458,0.00016017898,0.0010189003,0.0011038922,0.003671663,0.00034177952,0.0003888512,0.0013233022],"category_scores_gemma":[0.033433985,0.00016889897,0.0001270818,0.001159153,0.0030213057,0.0011697949,0.0029822902,0.00050919387,0.00013657312],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022494548,0.00037533394,0.71299726,0.00025509385,0.0001160879,0.00072059204,0.15193777,0.0013540034,0.0031952318,0.01332885,0.00095225434,0.11454253],"study_design_scores_gemma":[0.000026430547,0.0005165514,0.7526715,0.00029630848,0.000064587985,0.0004281537,0.21534865,0.001600558,0.0014661306,0.004427166,0.023103846,0.00005003821],"about_ca_topic_score_codex":0.0035241232,"about_ca_topic_score_gemma":0.0061508724,"teacher_disagreement_score":0.013016386,"about_ca_system_score_codex":0.001984382,"about_ca_system_score_gemma":0.0031456817,"threshold_uncertainty_score":0.06883806},"labels":[],"label_agreement":null},{"id":"W4406661633","doi":"10.1007/978-3-031-77806-3_2","title":"The Rise of Hybrid Project Management Approaches and Methodologies: Prioritizing Competency Development","year":2025,"lang":"en","type":"book-chapter","venue":"Information systems engineering and management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Process management; Systems engineering; Engineering; Engineering management; Computer science; Management science","score_opus":0.10448615559321008,"score_gpt":0.298550253467299,"score_spread":0.19406409787408896,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406661633","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014607258,0.026175233,0.7811811,0.01363852,0.00060199614,0.00013037804,0.00010470138,0.00041805106,0.16314273],"genre_scores_gemma":[0.16121651,0.010152219,0.8020126,0.0020228412,0.00024852215,0.00034598252,0.00018774396,0.00026145688,0.023552068],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9876796,0.0073952507,0.00035543964,0.00063389016,0.0035993261,0.00033641857],"domain_scores_gemma":[0.98285705,0.012895622,0.00064222235,0.0010928445,0.0018326102,0.00067975826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01361196,0.00081043673,0.0005780912,0.0036271026,0.0007388428,0.008910782,0.0023322983,0.0016276899,0.00379595],"category_scores_gemma":[0.016342811,0.0005025568,0.0004753053,0.0039504226,0.0046865004,0.0071062194,0.004701098,0.002841881,0.0009983225],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016823733,0.000057991005,0.00087658176,0.0004514757,0.000032797463,0.00004949875,0.0018852175,0.0031182515,0.0008903995,0.47048712,0.009232322,0.5129015],"study_design_scores_gemma":[0.000017160302,0.00011063987,0.0021695045,0.0015750934,0.000027300905,0.0003106901,0.0032871668,0.03062244,0.0025322326,0.7658935,0.19339724,0.000057021603],"about_ca_topic_score_codex":0.0020689573,"about_ca_topic_score_gemma":0.004388851,"teacher_disagreement_score":0.01361196,"about_ca_system_score_codex":0.0029642982,"about_ca_system_score_gemma":0.005648796,"threshold_uncertainty_score":0.07198775},"labels":[],"label_agreement":null},{"id":"W4406937772","doi":"10.1080/15578771.2025.2453435","title":"Investigating the relationship between organizational mindset orientation and project performance of large organizations in the Ghanaian construction industry","year":2025,"lang":"en","type":"article","venue":"International Journal of Construction Education and Research","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Mindset; Construction industry; Business; Knowledge management; Orientation (vector space); Organizational performance; Process management; Engineering; Construction engineering; Marketing; Computer science","score_opus":0.11765890474355682,"score_gpt":0.4805328160946963,"score_spread":0.36287391135113944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406937772","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9996711,0.000022736156,0.00004752897,0.000028396898,5.6737844e-7,0.000003264041,0.000005235014,4.6343416e-7,0.00022068385],"genre_scores_gemma":[0.9998242,0.000023452905,0.000073714524,0.000005048154,0.0000010672048,0.0000044369185,0.000010322384,3.768371e-7,0.000057322708],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999057,0.00043196333,0.000056669312,0.00006541573,0.00021148217,0.00017747126],"domain_scores_gemma":[0.9883022,0.004114924,0.004642334,0.00033474312,0.00087803457,0.0017276653],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019427005,0.00022678115,0.00016809309,0.0011400221,0.0005801371,0.0011359476,0.00022160183,0.00026053,0.0011048133],"category_scores_gemma":[0.009386571,0.00015768054,0.00016754968,0.0007605503,0.0010247437,0.00062918203,0.0011723572,0.00055809336,0.00012488311],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006242672,0.00017627428,0.98174703,0.000031761443,0.000019927125,0.000099926714,0.006206139,0.00013621681,0.00076215516,0.0001304444,0.000055646775,0.010572091],"study_design_scores_gemma":[0.0000016306022,0.000100912584,0.99334645,0.000014440089,0.0000037687587,0.00004178446,0.006053586,0.00012260435,0.000081247395,0.00008431915,0.00014562071,0.0000036167867],"about_ca_topic_score_codex":0.0031555763,"about_ca_topic_score_gemma":0.006981479,"teacher_disagreement_score":0.0031555763,"about_ca_system_score_codex":0.0009813593,"about_ca_system_score_gemma":0.0009804907,"threshold_uncertainty_score":0.010274053},"labels":[],"label_agreement":null},{"id":"W4406991210","doi":"10.30574/wjarr.2025.25.1.0236","title":"Integrating sustainability in project management in Egypt: Barriers, challenges and strategies","year":2025,"lang":"en","type":"article","venue":"World Journal of Advanced Research and Reviews","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Sustainability; Environmental planning; Business; Environmental resource management; Process management; Geography; Environmental science","score_opus":0.1558752601573762,"score_gpt":0.5025699088286726,"score_spread":0.3466946486712964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406991210","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8248616,0.0142243,0.012383783,0.069798134,0.00018146996,0.0006358265,0.00011380775,0.00008047068,0.077720664],"genre_scores_gemma":[0.9865074,0.0035886744,0.0042749587,0.0013749104,0.00001642248,0.00017794306,0.0000319834,0.000009567991,0.0040180515],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9869135,0.007290386,0.0009242683,0.0006216806,0.0021752778,0.0020748633],"domain_scores_gemma":[0.98940873,0.0043834536,0.0023650106,0.0004605991,0.0017228116,0.0016592784],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013921927,0.00044646644,0.00042511773,0.0013772787,0.004593349,0.009318743,0.0018879502,0.0020083475,0.0034787033],"category_scores_gemma":[0.012688397,0.00043494423,0.0002867846,0.0029622274,0.0047599166,0.0041682688,0.011086669,0.0015188978,0.0002957275],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001975254,0.0006466863,0.10752839,0.005149997,0.0002033236,0.0031847833,0.16626415,0.0034929335,0.0029153496,0.15338743,0.011035634,0.5459938],"study_design_scores_gemma":[0.000030569463,0.00025982395,0.053431727,0.0056637097,0.00008173271,0.0012603052,0.66299427,0.0018715685,0.0016860566,0.043285392,0.22933711,0.0000976981],"about_ca_topic_score_codex":0.010334028,"about_ca_topic_score_gemma":0.012375395,"teacher_disagreement_score":0.013921927,"about_ca_system_score_codex":0.008738744,"about_ca_system_score_gemma":0.035708208,"threshold_uncertainty_score":0.073627114},"labels":[],"label_agreement":null},{"id":"W4407262309","doi":"10.5267/j.msl.2024.7.001","title":"Working on projects-career satisfaction of employees stationed on-site at clients’ facilities for project delivery","year":2025,"lang":"en","type":"article","venue":"Management Science Letters","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Integrated project delivery; Job satisfaction; Operations management; Marketing; Management; Psychology; Engineering management; Engineering; Project management; Social psychology","score_opus":0.10458013475647758,"score_gpt":0.34635891395687496,"score_spread":0.24177877920039736,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407262309","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9990675,0.000028923076,0.00004311408,0.00006243703,0.0000021991377,0.0000033352649,0.000019237637,7.60051e-7,0.00077257317],"genre_scores_gemma":[0.9989304,0.000056786765,0.0000921068,0.000034367975,0.000002247355,0.000007200155,0.000048837053,9.124867e-7,0.0008269891],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9986524,0.0005583948,0.00008139389,0.00006171134,0.00023216214,0.00041399893],"domain_scores_gemma":[0.9951042,0.000907965,0.0012676497,0.00019223304,0.00077942794,0.001748641],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017261723,0.00015349315,0.00021355173,0.0005731193,0.0013700951,0.0015606498,0.00028320373,0.0003279002,0.0044543217],"category_scores_gemma":[0.003976209,0.0001705357,0.00024103346,0.0005252733,0.00048595166,0.00037399077,0.0011367195,0.00071310624,0.0006845252],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000078920326,0.0003176691,0.9609676,0.000041841104,0.000024234208,0.0002967925,0.013919449,0.00007946394,0.0009041321,0.00016827587,0.0006167942,0.02258486],"study_design_scores_gemma":[0.000004417038,0.00035423355,0.9439075,0.000030464662,0.000010710953,0.0003349397,0.053270403,0.00014048012,0.00020746593,0.0000692103,0.0016599402,0.000010244331],"about_ca_topic_score_codex":0.0034262338,"about_ca_topic_score_gemma":0.00793233,"teacher_disagreement_score":0.0044543217,"about_ca_system_score_codex":0.0006140507,"about_ca_system_score_gemma":0.0015940162,"threshold_uncertainty_score":0.014901161},"labels":[],"label_agreement":null},{"id":"W4407377754","doi":"10.1177/87569728251315013","title":"Special Issue: Project Governance: Reflections on the Past and Suggestions for the Future","year":2025,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Corporate governance; Process management; Project governance; Engineering ethics; Management science; Business; Political science; Engineering; Engineering management; Finance","score_opus":0.0755908185948657,"score_gpt":0.4015393395743996,"score_spread":0.32594852097953386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407377754","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0002852974,0.013515329,0.00025507546,0.2625246,0.71833193,0.00003606155,0.00012493269,0.000049997125,0.0048766434],"genre_scores_gemma":[0.004187191,0.014744755,0.0005081093,0.081726715,0.87506676,0.0001116416,0.0001903285,0.00009823862,0.023366375],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9935681,0.0014526375,0.0007804091,0.0007646701,0.0026054478,0.0008286396],"domain_scores_gemma":[0.9587635,0.01963804,0.002941039,0.001839262,0.0105944825,0.006223769],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012498066,0.0017462025,0.0027585642,0.0022714152,0.0047352677,0.018644053,0.004182675,0.023883903,0.034323346],"category_scores_gemma":[0.030028861,0.00076739764,0.0016403401,0.0035226014,0.0052309353,0.009152945,0.004495018,0.015859958,0.010043077],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017877344,0.000026128708,0.000091521826,0.00018872328,0.0000049321284,0.00005113572,0.00008342524,0.000022009837,0.00004512165,0.0015407325,0.9936725,0.0042558927],"study_design_scores_gemma":[0.000027016147,0.000037753103,0.0011035005,0.0006187072,0.000021082818,0.00018129301,0.0007526371,0.00010239061,0.000090200374,0.0046799714,0.9923577,0.000027797916],"about_ca_topic_score_codex":0.002939486,"about_ca_topic_score_gemma":0.006629493,"teacher_disagreement_score":0.034323346,"about_ca_system_score_codex":0.00419287,"about_ca_system_score_gemma":0.00826949,"threshold_uncertainty_score":0.114822984},"labels":[],"label_agreement":null},{"id":"W4407379580","doi":"10.1080/09537287.2025.2456959","title":"Paradoxes and trade-offs in the front-end process of large public projects","year":2025,"lang":"en","type":"article","venue":"Production Planning & Control","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"Arts and Humanities Research Council","keywords":"Front and back ends; Process (computing); Process management; Business; Front (military); Computer science; Operations management; Industrial organization; Engineering; Economics; Mechanical engineering; Operating system","score_opus":0.05698222758623264,"score_gpt":0.361598030861032,"score_spread":0.3046158032747993,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407379580","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5371757,0.0022137226,0.2845702,0.01162115,0.00015530147,0.0005643281,0.00005934984,0.00016163899,0.16347863],"genre_scores_gemma":[0.9763417,0.00031897932,0.020371977,0.00012206876,0.000017241176,0.0001237986,0.000013975426,0.000019443227,0.00267073],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.97155905,0.021353027,0.00058051036,0.0009863449,0.0038973233,0.0016237517],"domain_scores_gemma":[0.963616,0.02887533,0.0025050335,0.0017784671,0.0016827962,0.0015424538],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.024628872,0.0006983931,0.0006842499,0.0024495078,0.0059835115,0.017126976,0.0020803923,0.0038694185,0.0041083586],"category_scores_gemma":[0.03992038,0.0006365876,0.0009144502,0.0021849805,0.018907975,0.014088239,0.008205253,0.0040461053,0.0003881797],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014256111,0.00017920537,0.0020182228,0.00020691959,0.000029812634,0.0013339116,0.032514192,0.008926243,0.0011078741,0.93259853,0.0007105272,0.020231994],"study_design_scores_gemma":[0.000062757,0.00016129424,0.0026795452,0.00029056813,0.000021135398,0.0005259031,0.046039276,0.02352724,0.001180516,0.9080819,0.017318288,0.00011157161],"about_ca_topic_score_codex":0.0019461383,"about_ca_topic_score_gemma":0.001827509,"teacher_disagreement_score":0.024628872,"about_ca_system_score_codex":0.00624734,"about_ca_system_score_gemma":0.0042853486,"threshold_uncertainty_score":0.13025153},"labels":[],"label_agreement":null},{"id":"W4408120454","doi":"10.1007/978-3-031-84224-5_5","title":"Where Project Governance and Sustainability Meet? A Review of Literature and Discussion on IPD Governance Structure","year":2025,"lang":"en","type":"review","venue":"Lecture notes in civil engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Université du Québec à Montréal","funders":"","keywords":"Corporate governance; Sustainability; Project governance; Political science; Business; Public administration; Engineering ethics; Engineering; Finance; Ecology","score_opus":0.018186906951771335,"score_gpt":0.33465924896544924,"score_spread":0.3164723420136779,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408120454","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00058367493,0.99339175,0.00030700976,0.003536702,0.000101058664,0.000006784204,0.000019578769,0.0000025026286,0.0020510678],"genre_scores_gemma":[0.008716079,0.99002695,0.00036731517,0.0005972186,0.00010896133,0.000015109348,0.00002205007,0.000002133756,0.00014422041],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.99690574,0.0013491084,0.00038098742,0.00033802804,0.0007785299,0.00024758314],"domain_scores_gemma":[0.98970526,0.007460523,0.0011834983,0.00017555284,0.0012545377,0.00022067694],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0056753843,0.0006638903,0.001561095,0.00540936,0.00071989547,0.005017352,0.0010385019,0.0020443848,0.0038177206],"category_scores_gemma":[0.012483679,0.0005473963,0.0006657721,0.013789326,0.0032030314,0.00728349,0.0026225334,0.0018434233,0.0005804509],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006780184,0.00004766581,0.0018933751,0.054537967,0.00016573105,0.0002352626,0.0012440217,0.00054974906,0.0003289744,0.06947313,0.014216574,0.85723966],"study_design_scores_gemma":[0.000028914286,0.00012250058,0.011758223,0.15172677,0.00043822292,0.0008095316,0.007875621,0.00038160838,0.0005452054,0.046137612,0.7801077,0.000068048284],"about_ca_topic_score_codex":0.0056253467,"about_ca_topic_score_gemma":0.011045039,"teacher_disagreement_score":0.0056753843,"about_ca_system_score_codex":0.0038101496,"about_ca_system_score_gemma":0.008557319,"threshold_uncertainty_score":0.030014694},"labels":[],"label_agreement":null},{"id":"W4408171536","doi":"10.5267/j.jpm.2025.1.004","title":"Green project management competencies and sustainable development goals (SDGs): Empirical evidence","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Prince Sattam bin Abdulaziz University","keywords":"Sustainable development; Empirical evidence; Business; Process management; Environmental resource management; Environmental planning; Knowledge management; Political science; Computer science; Economics; Environmental science","score_opus":0.14960398291325985,"score_gpt":0.4148512851105501,"score_spread":0.2652473021972902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408171536","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9481109,0.01282381,0.0027841446,0.0046417904,0.00007031026,0.000096033844,0.00031410213,0.000026727697,0.03113224],"genre_scores_gemma":[0.99189067,0.0056931567,0.0016087632,0.00022651482,0.000015433148,0.000036473466,0.00010449291,0.0000060072875,0.0004184233],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9967996,0.00086998247,0.0002680618,0.00032034458,0.0015110628,0.00023099445],"domain_scores_gemma":[0.94638073,0.03277795,0.0119044855,0.0009234096,0.0054553202,0.0025581804],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004778539,0.00031283882,0.00032720415,0.0022101998,0.00051700184,0.0012555401,0.00067417766,0.00055022206,0.003528728],"category_scores_gemma":[0.02814001,0.00027902145,0.0003379583,0.0022258922,0.0015316133,0.0018545972,0.0023988946,0.0011253319,0.00028194697],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053775704,0.0007367993,0.75064284,0.0025230383,0.0001666988,0.00021335583,0.0042941337,0.00093368086,0.00023596821,0.0066383025,0.001950248,0.2316112],"study_design_scores_gemma":[0.0000062216614,0.00010639765,0.97554094,0.0022338305,0.00006166933,0.0001965886,0.00851023,0.0006261268,0.00029530816,0.0021560346,0.010247543,0.00001907039],"about_ca_topic_score_codex":0.0057641645,"about_ca_topic_score_gemma":0.011131682,"teacher_disagreement_score":0.0057641645,"about_ca_system_score_codex":0.0010477254,"about_ca_system_score_gemma":0.0045846864,"threshold_uncertainty_score":0.025271595},"labels":[],"label_agreement":null},{"id":"W4408172006","doi":"10.5267/j.jpm.2025.2.001","title":"Project risk assessment: A holistic risk identification, analysis and evaluation approach, The case of EPC projects","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Identification (biology); Risk assessment; Risk analysis (engineering); Project risk management; Engineering; Computer science; Business; Systems engineering; Project management; Project management triangle; Computer security","score_opus":0.10877210307401605,"score_gpt":0.44846187805342624,"score_spread":0.3396897749794102,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408172006","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.099220425,0.0031693748,0.8208419,0.005825538,0.00012674778,0.00085178966,0.00020541319,0.0001804749,0.06957832],"genre_scores_gemma":[0.6802019,0.0025552048,0.30894926,0.00022035278,0.000060684808,0.0005215363,0.000115732146,0.000047698144,0.007327669],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.98674715,0.008257902,0.00045380468,0.0005214364,0.0032854464,0.00073426747],"domain_scores_gemma":[0.99452597,0.0031045442,0.00061792653,0.00033271656,0.0010933155,0.00032553097],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012500666,0.0014023681,0.0009698337,0.0052683335,0.0033774246,0.006597037,0.0019285822,0.0034581232,0.0025941804],"category_scores_gemma":[0.009745249,0.00066538516,0.0012819036,0.003907402,0.0029390168,0.00394223,0.005531811,0.002353757,0.00036992136],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018394871,0.00047587068,0.010563222,0.0012781254,0.00027153068,0.0077684014,0.012312719,0.3099001,0.005626612,0.37739965,0.009569258,0.2646506],"study_design_scores_gemma":[0.000059634825,0.00058591715,0.0106174555,0.0017726608,0.00024056293,0.006991893,0.03195077,0.5717562,0.004829435,0.2938427,0.07704091,0.00031189132],"about_ca_topic_score_codex":0.006491879,"about_ca_topic_score_gemma":0.007823662,"teacher_disagreement_score":0.012500666,"about_ca_system_score_codex":0.004154048,"about_ca_system_score_gemma":0.0061373417,"threshold_uncertainty_score":0.06611061},"labels":[],"label_agreement":null},{"id":"W4408200318","doi":"10.1007/978-3-031-80275-1_11","title":"Project Risk Management (PRM) in Situations of High Complexity and Deep Uncertainty","year":2025,"lang":"en","type":"book-chapter","venue":"Information systems engineering and management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Calgary Laboratory Services","funders":"","keywords":"Computer science; Risk management; Risk analysis (engineering); Business","score_opus":0.03535623541220944,"score_gpt":0.2722474383348843,"score_spread":0.23689120292267485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408200318","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01754385,0.014173181,0.5742244,0.0076628765,0.0006931599,0.00013937392,0.00006388462,0.00022819063,0.38527104],"genre_scores_gemma":[0.6299008,0.016299136,0.21539655,0.0009104938,0.0015341456,0.00032174253,0.000087807464,0.00014421389,0.13540515],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9984622,0.0006177251,0.000050276733,0.000117521085,0.000659956,0.000092393726],"domain_scores_gemma":[0.9984276,0.0010139405,0.00017982736,0.00013388215,0.00016359825,0.000081061495],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002642139,0.0006326305,0.00048569,0.000908736,0.00063851284,0.0034261066,0.0010994053,0.0015470638,0.0045415824],"category_scores_gemma":[0.004730982,0.0003072939,0.00043778092,0.0011115978,0.0021196646,0.0030389994,0.0023827495,0.0018304113,0.00073923473],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016706848,0.000050745675,0.0005911177,0.00020222124,0.00002248564,0.00018589509,0.00067263265,0.036897503,0.00072751095,0.68338686,0.012731522,0.2645147],"study_design_scores_gemma":[0.0000047394337,0.000084009356,0.0008402326,0.00022765003,0.0000110235815,0.0003476886,0.00054306275,0.054078106,0.0005555717,0.887485,0.055799104,0.00002382704],"about_ca_topic_score_codex":0.0007823596,"about_ca_topic_score_gemma":0.00141587,"teacher_disagreement_score":0.0045415824,"about_ca_system_score_codex":0.0010574195,"about_ca_system_score_gemma":0.0014067267,"threshold_uncertainty_score":0.015193105},"labels":[],"label_agreement":null},{"id":"W4408202507","doi":"10.1007/978-3-031-80275-1_5","title":"PMBOK® Challenges and Lessons Learned in the Quebec Public Administration: A Comparative Analysis with ISO 21502 Standard","year":2025,"lang":"en","type":"book-chapter","venue":"Information systems engineering and management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Administration (probate law); Political science; Law","score_opus":0.10112354295783454,"score_gpt":0.32599285073469053,"score_spread":0.224869307776856,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408202507","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1890327,0.025247898,0.011399473,0.06600947,0.0012700778,0.00036165724,0.0025915243,0.0012923795,0.70279473],"genre_scores_gemma":[0.6080501,0.01242432,0.010982829,0.003934303,0.00016407395,0.00013855033,0.002384023,0.00067072146,0.36125097],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9883781,0.0014342951,0.00024984402,0.0005129017,0.008000793,0.001424087],"domain_scores_gemma":[0.9879909,0.0015039062,0.00036273376,0.00041474038,0.009121035,0.0006066395],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008732794,0.00040990824,0.00044859218,0.004971455,0.006890186,0.015706591,0.0025886402,0.0022364352,0.011846772],"category_scores_gemma":[0.00931983,0.00046411017,0.0005254784,0.008980484,0.0038045682,0.005882519,0.00149989,0.002380914,0.0021224662],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017475752,0.0002049888,0.022305429,0.0009368635,0.000032500026,0.0008424996,0.019587625,0.0039474396,0.0036074861,0.23612267,0.2087857,0.503452],"study_design_scores_gemma":[0.000016337628,0.00015048482,0.07768883,0.0011002636,0.000040089635,0.00026214524,0.029630655,0.003583978,0.0015156439,0.007010365,0.8788543,0.00014688507],"about_ca_topic_score_codex":0.9718326,"about_ca_topic_score_gemma":0.97751254,"teacher_disagreement_score":0.12612438,"about_ca_system_score_codex":0.12612438,"about_ca_system_score_gemma":0.10726813,"threshold_uncertainty_score":0.9151007},"labels":[],"label_agreement":null},{"id":"W4408204044","doi":"10.1108/ijmpb-09-2024-0223","title":"Impact of using project management tools and techniques on project and firm performance","year":2025,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"","keywords":"Project management; Process management; Business; Operations management; Environmental resource management; Management; Economics","score_opus":0.10643060786092752,"score_gpt":0.4348423394025867,"score_spread":0.3284117315416592,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408204044","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99318224,0.0003671406,0.0021267575,0.00021456517,0.000009069881,0.000057361533,0.000043502023,0.00003234325,0.0039669643],"genre_scores_gemma":[0.9966897,0.0002691167,0.0026283485,0.000030255596,0.000011468264,0.00003253191,0.000045330406,0.0000073952306,0.00028577467],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98168945,0.009195634,0.0012417948,0.00088012614,0.005833142,0.0011598159],"domain_scores_gemma":[0.8212107,0.115653604,0.03959774,0.005991223,0.011281889,0.006264883],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01259096,0.00045203566,0.00024152806,0.0017031156,0.00050540647,0.0030939968,0.00050908956,0.00041490383,0.0014265684],"category_scores_gemma":[0.080011174,0.00022117163,0.0003251967,0.0013395088,0.0007945381,0.0014709339,0.0018593009,0.0009810883,0.00025854423],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020570934,0.001255287,0.6869622,0.0005121993,0.00027974334,0.00025416614,0.0035896471,0.0032490264,0.0034686984,0.0007136068,0.00058318593,0.29892647],"study_design_scores_gemma":[0.000017395905,0.0026118767,0.9794082,0.000330386,0.000094083975,0.00040707606,0.007564902,0.004346586,0.0017458613,0.00072889664,0.0026847709,0.000059963433],"about_ca_topic_score_codex":0.0011858569,"about_ca_topic_score_gemma":0.0016733921,"teacher_disagreement_score":0.01259096,"about_ca_system_score_codex":0.0010200503,"about_ca_system_score_gemma":0.0019187815,"threshold_uncertainty_score":0.06658816},"labels":[],"label_agreement":null},{"id":"W4408226340","doi":"10.1287/mnsc.2022.01574","title":"Project Networks and Reallocation Externalities","year":2025,"lang":"en","type":"article","venue":"Management Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University; University of British Columbia; York University","funders":"","keywords":"Externality; Economics; Business; Computer science; Microeconomics","score_opus":0.054623265911214025,"score_gpt":0.39536958507375375,"score_spread":0.3407463191625397,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408226340","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.64744365,0.0015572995,0.12828544,0.008367084,0.00015996088,0.0002679275,0.002781849,0.00045296518,0.2106838],"genre_scores_gemma":[0.9889925,0.00048332138,0.0048395833,0.000101853904,0.00003395909,0.00012327661,0.0003342688,0.000048288708,0.005042932],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9968713,0.00153548,0.00013790368,0.0004471515,0.0005803897,0.00042780317],"domain_scores_gemma":[0.98555505,0.007686541,0.0037229995,0.000976852,0.0012568064,0.0008017706],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027383023,0.00039493782,0.0003757114,0.0019235829,0.0012071196,0.003663463,0.00079169334,0.0008321952,0.016693233],"category_scores_gemma":[0.01916831,0.00030755828,0.00034373935,0.004372459,0.0021088365,0.004944998,0.003619267,0.00097596075,0.0006298645],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052378664,0.00019223744,0.09783246,0.00051190006,0.00014922801,0.0006263602,0.0023702641,0.19994909,0.0014132458,0.5774471,0.017397454,0.10158689],"study_design_scores_gemma":[0.00015895172,0.00027185614,0.11273073,0.00062308606,0.00016099206,0.0009321247,0.009413502,0.15106185,0.0022048277,0.5903057,0.13199365,0.00014281507],"about_ca_topic_score_codex":0.0043974337,"about_ca_topic_score_gemma":0.007262702,"teacher_disagreement_score":0.016693233,"about_ca_system_score_codex":0.0030862363,"about_ca_system_score_gemma":0.0014003941,"threshold_uncertainty_score":0.055844426},"labels":[],"label_agreement":null},{"id":"W4408275413","doi":"10.38140/as.v12i1.1751","title":"Efficiency in the provision of production specifications for the South African construction industry","year":2005,"lang":"en","type":"article","venue":"Acta Structilia","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Production (economics); Business; Operations management; Engineering; Economics; Microeconomics","score_opus":0.1346233319425785,"score_gpt":0.3532453232410898,"score_spread":0.21862199129851131,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408275413","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47574538,0.014530183,0.23253457,0.028524822,0.00049535115,0.0024845393,0.0021480497,0.0036309042,0.23990625],"genre_scores_gemma":[0.8787812,0.0051444895,0.076549605,0.0011150626,0.00017748224,0.00070519676,0.0017305644,0.0009370598,0.034859322],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.92246187,0.03772516,0.007876122,0.003969835,0.023047525,0.0049195443],"domain_scores_gemma":[0.825255,0.08367324,0.021830175,0.03732134,0.029199094,0.002721168],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.05376634,0.0010048198,0.0006464642,0.007815762,0.0026701626,0.01105767,0.0030654357,0.0016360795,0.011120089],"category_scores_gemma":[0.14259535,0.0014658043,0.00064644415,0.014793252,0.0036692182,0.008065707,0.007393913,0.0020579346,0.0059345705],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006284816,0.00027310048,0.051787175,0.0024286746,0.00009307797,0.0011041535,0.02761992,0.010723473,0.009295343,0.08742724,0.019679472,0.78893983],"study_design_scores_gemma":[0.0001658107,0.00063058734,0.16148068,0.003676488,0.00017804728,0.0027013633,0.03523545,0.012011832,0.020641558,0.032238558,0.73064405,0.0003956368],"about_ca_topic_score_codex":0.017066805,"about_ca_topic_score_gemma":0.010079096,"teacher_disagreement_score":0.05376634,"about_ca_system_score_codex":0.010690168,"about_ca_system_score_gemma":0.02042623,"threshold_uncertainty_score":0.284347},"labels":[],"label_agreement":null},{"id":"W4408398266","doi":"10.1007/978-3-031-84208-5_63","title":"Exploring the Characteristics of Effective Project Control Method","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Control (management); Computer science; Artificial intelligence","score_opus":0.061666047259631596,"score_gpt":0.3161634868037236,"score_spread":0.254497439544092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398266","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16235644,0.0013777848,0.7167367,0.0007260502,0.00007700248,0.00020372953,0.00007083768,0.00030070735,0.11815075],"genre_scores_gemma":[0.92501175,0.0002556383,0.068177044,0.000058942052,0.00005303386,0.00016151252,0.000049552455,0.00009587314,0.006136604],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9953381,0.0020469376,0.0001524248,0.00037910935,0.0018223984,0.00026101404],"domain_scores_gemma":[0.95236284,0.038396765,0.0022687311,0.003733666,0.0026674683,0.0005705531],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045393948,0.0003209469,0.00032808844,0.00119508,0.0005049271,0.0030777494,0.0010743553,0.00078756385,0.006369371],"category_scores_gemma":[0.041732214,0.00034209524,0.0002475822,0.0010733334,0.0019871376,0.0031998556,0.0010234938,0.0008053538,0.00045753483],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020024815,0.00017160765,0.007005784,0.00019259623,0.00003126445,0.0001185793,0.0011103943,0.03282761,0.0041764886,0.68854755,0.0013252526,0.26429257],"study_design_scores_gemma":[0.000092236216,0.00065884594,0.010513821,0.000107170716,0.000046238707,0.00047918988,0.0009752892,0.4774677,0.007976824,0.48169374,0.019939046,0.00004987486],"about_ca_topic_score_codex":0.0008056682,"about_ca_topic_score_gemma":0.00066780404,"teacher_disagreement_score":0.006369371,"about_ca_system_score_codex":0.00095943233,"about_ca_system_score_gemma":0.0013632417,"threshold_uncertainty_score":0.024006903},"labels":[],"label_agreement":null},{"id":"W4408550388","doi":"10.3390/jrfm18030160","title":"Risk–Response Budgeting: A Financial Optimization Approach to Project Risk Management","year":2025,"lang":"en","type":"article","venue":"Journal of risk and financial management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Risk management; Finance; Financial risk; Risk analysis (engineering); Actuarial science","score_opus":0.019900802203071357,"score_gpt":0.2991013369432133,"score_spread":0.27920053474014195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408550388","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023521082,0.0003088296,0.9927545,0.00046625605,0.000035381276,0.00016668721,0.00003607618,0.0000840886,0.0037960543],"genre_scores_gemma":[0.2124577,0.0013177864,0.78059554,0.00027641724,0.00016411747,0.00091269595,0.000115424606,0.00017069912,0.0039896294],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.993814,0.004062974,0.00021694969,0.00039937723,0.0011359549,0.00037079206],"domain_scores_gemma":[0.99633163,0.0023399505,0.0004932182,0.00015922394,0.00052995386,0.00014599453],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010484059,0.0027088893,0.002194852,0.0034400926,0.0011878036,0.0034754535,0.0027130404,0.0020756854,0.0049253237],"category_scores_gemma":[0.012227423,0.0013982793,0.0014506861,0.0029619078,0.0019598913,0.0037414208,0.0021392095,0.0028357315,0.000468724],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059952934,0.00011779618,0.00049729686,0.00020152253,0.00010263828,0.000059529735,0.00016961194,0.8705385,0.0007962617,0.07154164,0.0011756897,0.05473961],"study_design_scores_gemma":[0.000043792294,0.00014422895,0.00031881136,0.00015553237,0.000052244533,0.000061261184,0.00012701581,0.9120739,0.0010761403,0.08000253,0.0058891587,0.000055364453],"about_ca_topic_score_codex":0.006247263,"about_ca_topic_score_gemma":0.0055894325,"teacher_disagreement_score":0.010484059,"about_ca_system_score_codex":0.0037041332,"about_ca_system_score_gemma":0.005323876,"threshold_uncertainty_score":0.05544567},"labels":[],"label_agreement":null},{"id":"W4408628646","doi":"10.5006/cp2019_19_3-65","title":"On Building Trusting Relationships ProFile: Shaun Danco","year":2019,"lang":"en","type":"article","venue":"CoatingsPro","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Psychology","score_opus":0.11874180080263301,"score_gpt":0.3683596547528339,"score_spread":0.24961785395020086,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408628646","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015030476,0.010853234,0.009732461,0.7879754,0.004938513,0.000084706546,0.00010236121,0.00018483077,0.17109795],"genre_scores_gemma":[0.40232846,0.03641323,0.011543023,0.13151419,0.0024980553,0.00016329707,0.00021266776,0.00041269575,0.4149143],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99796945,0.00071635045,0.000038948354,0.00019549763,0.000860042,0.00021975234],"domain_scores_gemma":[0.99148226,0.0020093536,0.00023256907,0.0002567347,0.0040696566,0.0019494491],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002873804,0.0003285188,0.00028360606,0.00084290415,0.007868762,0.0049838964,0.00072179694,0.0016437365,0.012831092],"category_scores_gemma":[0.010225329,0.00016433613,0.000115638475,0.00078158645,0.002658274,0.005659087,0.0023802526,0.0040987786,0.0033489796],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003596284,0.00006337091,0.0029469484,0.000096915384,0.000010249859,0.00016037207,0.0047329213,0.00041707538,0.00043583216,0.082246944,0.81832606,0.09052734],"study_design_scores_gemma":[0.000011452529,0.00004444174,0.0018570021,0.00037958115,0.0000134143365,0.00026229018,0.013990703,0.0028748866,0.0007386147,0.03791074,0.941857,0.000059802776],"about_ca_topic_score_codex":0.068748064,"about_ca_topic_score_gemma":0.14578742,"teacher_disagreement_score":0.068748064,"about_ca_system_score_codex":0.0051816595,"about_ca_system_score_gemma":0.00858635,"threshold_uncertainty_score":0.1366958},"labels":[],"label_agreement":null},{"id":"W4408666226","doi":"10.5539/ijps.v17n2p9","title":"Navigating Emotional Challenges During the Execution Phase: HRD Interventions for Early-Career Construction Project Managers","year":2025,"lang":"en","type":"article","venue":"International Journal of Psychological Studies","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Psychology; Psychological intervention; Phase (matter); Applied psychology; Management; Process management; Social psychology; Business","score_opus":0.37620336968362533,"score_gpt":0.5621504843643732,"score_spread":0.18594711468074787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408666226","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9800016,0.0011556977,0.0070420983,0.005544203,0.0001920791,0.0005188055,0.000018398901,0.00006780327,0.0054593277],"genre_scores_gemma":[0.98534137,0.0012637904,0.010484167,0.0006851407,0.000054399155,0.00080919923,0.000022348908,0.000006918709,0.0013327305],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9978242,0.0014907877,0.00006735575,0.0000930967,0.00016915513,0.0003554261],"domain_scores_gemma":[0.9963569,0.0014625432,0.0005367092,0.00011972186,0.0001705981,0.0013534429],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037345507,0.00040298628,0.00029451287,0.00034245205,0.0019276682,0.0015633292,0.00077819347,0.00080350606,0.0017958268],"category_scores_gemma":[0.007253672,0.0002631708,0.00026968657,0.00022711871,0.00095862197,0.00095245667,0.003016165,0.0014791749,0.00025343895],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010415438,0.014438294,0.045014326,0.0038320404,0.00010040782,0.0025478979,0.22215325,0.0015467819,0.011603729,0.00393292,0.011995787,0.6817931],"study_design_scores_gemma":[0.0020815292,0.01766479,0.21838625,0.0045170654,0.0002222912,0.0032463297,0.6087726,0.0047390587,0.007833069,0.013903195,0.11840294,0.00023083368],"about_ca_topic_score_codex":0.00043209855,"about_ca_topic_score_gemma":0.0016250925,"teacher_disagreement_score":0.0037345507,"about_ca_system_score_codex":0.0007630424,"about_ca_system_score_gemma":0.0035304166,"threshold_uncertainty_score":0.019750416},"labels":[],"label_agreement":null},{"id":"W4408716959","doi":"10.2139/ssrn.5169348","title":"Political Uncertainty and the Timing of Mass Layoffs","year":2025,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Politics; Political science; Business; Law","score_opus":0.02874608751371427,"score_gpt":0.3456455780622424,"score_spread":0.3168994905485281,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408716959","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9260852,0.0015159408,0.00851737,0.0040137684,0.00016261236,0.000041203788,0.00027725048,0.000060119368,0.059326585],"genre_scores_gemma":[0.99888664,0.00011174244,0.00009954553,0.000038222148,0.000034648925,0.0000040529076,0.000021668317,0.0000046088203,0.0007988527],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9989654,0.00027831827,0.000056101246,0.00012525004,0.00021832311,0.00035671773],"domain_scores_gemma":[0.9603036,0.029552778,0.0068608196,0.0005707505,0.0012946534,0.001417449],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038392015,0.00018055852,0.00046433366,0.0010718339,0.00083192135,0.0049563153,0.0004091142,0.0018538542,0.01052697],"category_scores_gemma":[0.043086216,0.00036518177,0.00019278182,0.00063824607,0.0011638575,0.0027397755,0.0011211145,0.0018597452,0.00074186357],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0050252345,0.0005512068,0.29953668,0.0004478494,0.0003095755,0.0020603659,0.003325856,0.08531598,0.00612516,0.46594855,0.013974106,0.11737934],"study_design_scores_gemma":[0.00017654426,0.0007346333,0.39746407,0.00020251685,0.00012685549,0.0004532657,0.009277914,0.07534308,0.00242663,0.50165516,0.011996241,0.00014317491],"about_ca_topic_score_codex":0.0025328975,"about_ca_topic_score_gemma":0.0028602404,"teacher_disagreement_score":0.01052697,"about_ca_system_score_codex":0.0011556129,"about_ca_system_score_gemma":0.0008863646,"threshold_uncertainty_score":0.035216272},"labels":[],"label_agreement":null},{"id":"W4408843960","doi":"10.1061/9780784485910.001","title":"Does ESG Performance in the Construction Industry Have an Impact on Digital Technology Innovation? A Stakeholder Theory Perspective","year":2025,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Perspective (graphical); Stakeholder; Stakeholder theory; Business; Knowledge management; Computer science; Management; Economics","score_opus":0.08025017054958829,"score_gpt":0.39117806593460946,"score_spread":0.3109278953850212,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408843960","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9785905,0.00036890074,0.0016706411,0.0018535886,0.000011586725,0.000020329924,0.00006968902,0.000005594415,0.017409218],"genre_scores_gemma":[0.99966466,0.000075030235,0.00006484538,0.000024970002,0.0000034861316,0.0000022731183,0.000010311174,5.576661e-7,0.00015379986],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9979838,0.0007770989,0.00008645564,0.00016466934,0.00043464563,0.0005533255],"domain_scores_gemma":[0.9922799,0.0036933417,0.002137897,0.00029040079,0.0010135587,0.0005849397],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028707625,0.00022043183,0.00028030394,0.002135527,0.00064203446,0.0025807016,0.0003671439,0.0009022738,0.0021187167],"category_scores_gemma":[0.0071838438,0.00009028788,0.00040089418,0.0021850232,0.002195183,0.0024980488,0.0016144848,0.0006697866,0.0001847495],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001297948,0.00042637176,0.89420396,0.00019641561,0.00013225914,0.00060803996,0.004694737,0.0070887036,0.002302817,0.044110168,0.0007736767,0.045333065],"study_design_scores_gemma":[0.000013790854,0.00032535664,0.9275151,0.00015733024,0.00009546895,0.00015285517,0.022608763,0.017222578,0.0021362843,0.023722002,0.0059976825,0.00005275273],"about_ca_topic_score_codex":0.007278913,"about_ca_topic_score_gemma":0.00834685,"teacher_disagreement_score":0.007278913,"about_ca_system_score_codex":0.0028391383,"about_ca_system_score_gemma":0.0017285913,"threshold_uncertainty_score":0.020599425},"labels":[],"label_agreement":null},{"id":"W4409243241","doi":"10.31803/tg-20240829131515","title":"The Impact of Design Team Characteristics on Construction Project Performance with the Mediating Role of Construction Project Costs","year":2025,"lang":"en","type":"article","venue":"Tehnički glasnik","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Project team; Integrated project delivery; Business; Engineering; Project management; Engineering management; Process management; Construction engineering; Systems engineering","score_opus":0.037304684879367514,"score_gpt":0.3439710933056373,"score_spread":0.3066664084262698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409243241","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9971956,0.00007615722,0.0007283413,0.000063885534,0.0000032540772,0.00001566504,0.00001533744,0.0000033126962,0.0018984849],"genre_scores_gemma":[0.9994717,0.000035845038,0.0002838004,0.0000036151246,0.000002665379,0.0000114311915,0.000012902478,0.0000018165061,0.00017627703],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99093235,0.0054108016,0.00043186644,0.00040020063,0.0018216701,0.0010031314],"domain_scores_gemma":[0.9590598,0.025558222,0.008372266,0.001483179,0.0027919745,0.002734548],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005168003,0.0006570084,0.00041807233,0.00092245045,0.00082546007,0.001875814,0.00047188363,0.00036882938,0.0023171424],"category_scores_gemma":[0.022738803,0.00021542789,0.000371924,0.000855886,0.0009718816,0.00097207376,0.0019164927,0.000597556,0.00020542329],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00069213647,0.0008745762,0.908595,0.0002864393,0.0002800458,0.0008917096,0.009161124,0.004958345,0.004548092,0.0019648701,0.00032221607,0.067425385],"study_design_scores_gemma":[0.000017683335,0.0005811952,0.9839384,0.000083485924,0.000113626855,0.00019207594,0.009362419,0.002508681,0.0015410837,0.00072149583,0.0009113659,0.000028447135],"about_ca_topic_score_codex":0.0020736174,"about_ca_topic_score_gemma":0.0020868767,"teacher_disagreement_score":0.005168003,"about_ca_system_score_codex":0.0009716784,"about_ca_system_score_gemma":0.0021131015,"threshold_uncertainty_score":0.027331352},"labels":[],"label_agreement":null},{"id":"W4409261117","doi":"10.1016/j.ijproman.2025.102705","title":"Considering alternatives to megaprojects for a sustainable future with degrowth principles","year":2025,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Degrowth; Economics; Business; Engineering; Sustainability; Ecology; Biology","score_opus":0.06329464197952668,"score_gpt":0.4013051474179775,"score_spread":0.33801050543845085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409261117","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14028701,0.009238357,0.13212089,0.27884114,0.0018023808,0.0005666901,0.00007598126,0.00010801422,0.4369596],"genre_scores_gemma":[0.927883,0.00263339,0.04234058,0.009330228,0.00031960115,0.00033525357,0.00004069796,0.00007189555,0.017045379],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97997344,0.013632689,0.00050499785,0.0011563904,0.0027075289,0.002024821],"domain_scores_gemma":[0.98794717,0.0062130876,0.0012898591,0.0010485926,0.0016422296,0.0018591445],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019239953,0.00086045376,0.0006169413,0.0012280897,0.008565588,0.01427633,0.002600772,0.0068830084,0.008394],"category_scores_gemma":[0.017219475,0.00045564285,0.00074664596,0.0013101334,0.03260226,0.017959943,0.012354496,0.0074132034,0.0006680701],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022821856,0.000038515725,0.00076904095,0.00014466688,0.000010898945,0.00028354887,0.008970446,0.0009720072,0.00023436113,0.9722272,0.004131874,0.012194657],"study_design_scores_gemma":[0.000017448405,0.000099407625,0.0012201343,0.00075678836,0.000016699698,0.00025375286,0.040085647,0.001099242,0.00043456798,0.74968314,0.20628971,0.000043499982],"about_ca_topic_score_codex":0.0029714112,"about_ca_topic_score_gemma":0.011122905,"teacher_disagreement_score":0.019239953,"about_ca_system_score_codex":0.0074940715,"about_ca_system_score_gemma":0.011923069,"threshold_uncertainty_score":0.101751804},"labels":[],"label_agreement":null},{"id":"W4409618273","doi":"10.1080/01446193.2025.2479764","title":"Machine learning and optimization strategies for infrastructure projects risk management","year":2025,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Risk management; Computer science; Business; Risk analysis (engineering); Engineering management; Engineering; Knowledge management; Finance","score_opus":0.0211767701845107,"score_gpt":0.2836591872622158,"score_spread":0.2624824170777051,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409618273","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020678027,0.0018028407,0.9707163,0.0014362114,0.00006319305,0.00009531744,0.00008471873,0.00021665855,0.0049067065],"genre_scores_gemma":[0.7961717,0.0017821223,0.19707754,0.00035210443,0.00017645385,0.0003772755,0.0002504239,0.00007756121,0.0037347586],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99919695,0.00041340382,0.000044510165,0.00012538796,0.00014753672,0.0000721976],"domain_scores_gemma":[0.9977435,0.0016738027,0.00020461548,0.000071266404,0.00024265645,0.00006422788],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022087502,0.0013013782,0.0011620844,0.0011635824,0.00045295295,0.0014397886,0.001148408,0.0013047819,0.0020395885],"category_scores_gemma":[0.0050293994,0.00057687314,0.0006925684,0.001068026,0.0008208151,0.0011486312,0.0013669236,0.0017616047,0.0003046891],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008863768,0.000023191746,0.00032892794,0.00003163165,0.000024219522,0.000015870695,0.00001489774,0.97994655,0.00012116484,0.004707945,0.00032512625,0.014451543],"study_design_scores_gemma":[0.0000025019149,0.000010820003,0.000055890312,0.0000070716646,0.0000037810946,0.0000027121791,0.000005991705,0.9953176,0.000063164276,0.0043191677,0.00020887643,0.000002493216],"about_ca_topic_score_codex":0.0064251735,"about_ca_topic_score_gemma":0.005080683,"teacher_disagreement_score":0.0064251735,"about_ca_system_score_codex":0.0013224819,"about_ca_system_score_gemma":0.0018888023,"threshold_uncertainty_score":0.01277554},"labels":[],"label_agreement":null},{"id":"W4409638192","doi":"10.20944/preprints202504.1635.v1","title":"A Capability Maturity Model for Integrated Project Delivery","year":2025,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Mitacs","keywords":"Capability Maturity Model; Maturity (psychological); Integrated project delivery; Computer science; Process management; Systems engineering; Business; Engineering; Project management; Operating system; Psychology","score_opus":0.33247197142046003,"score_gpt":0.44675490383427774,"score_spread":0.1142829324138177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409638192","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025890669,0.003387598,0.8644013,0.008328807,0.00013684164,0.001601698,0.00059112965,0.0004155049,0.0952465],"genre_scores_gemma":[0.48980677,0.0039234348,0.4947339,0.0006012733,0.000069194946,0.0030554053,0.0006770808,0.00009423794,0.0070388215],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99155724,0.003969195,0.0007926478,0.00068289146,0.0023765685,0.0006213885],"domain_scores_gemma":[0.9881024,0.0054044276,0.0011854055,0.0008179867,0.003765591,0.00072414684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012546793,0.0010426388,0.00040493615,0.005261893,0.0012817932,0.005832308,0.0017984555,0.0024674875,0.0037056506],"category_scores_gemma":[0.020545302,0.00056021794,0.0014107454,0.0038060648,0.0025831491,0.008725899,0.0036799475,0.0032118966,0.0014064386],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003627609,0.00013313329,0.003411155,0.00067415385,0.000053451775,0.00025971892,0.004626356,0.021400407,0.001374626,0.8811987,0.0030583825,0.0837737],"study_design_scores_gemma":[0.00007061403,0.00048989465,0.0063277967,0.0020995322,0.00007952473,0.0007184649,0.0046201097,0.07640945,0.0021045948,0.7438156,0.16306707,0.00019732062],"about_ca_topic_score_codex":0.007573896,"about_ca_topic_score_gemma":0.004425331,"teacher_disagreement_score":0.012546793,"about_ca_system_score_codex":0.009022821,"about_ca_system_score_gemma":0.011022133,"threshold_uncertainty_score":0.06635457},"labels":[],"label_agreement":null},{"id":"W4409704129","doi":"10.1061/jcemd4.coeng-15381","title":"Data-Driven Assessment of Complexity-Induced Risks in Infrastructure Projects","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Risk analysis (engineering); Risk assessment; Business; Computer science; Data science; Computer security","score_opus":0.13013666474255117,"score_gpt":0.4029982656097152,"score_spread":0.27286160086716404,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409704129","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71219814,0.0005647875,0.27453405,0.0012117728,0.00005638551,0.000372777,0.0022302466,0.00036993533,0.008461918],"genre_scores_gemma":[0.9719706,0.00021543489,0.026104575,0.000044747427,0.000013351287,0.0001306483,0.0010812068,0.000026438955,0.00041307087],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9964784,0.0014474392,0.00029464788,0.00047466805,0.0010869893,0.00021784355],"domain_scores_gemma":[0.98174393,0.010770316,0.0032847626,0.0012518056,0.0024541654,0.0004950711],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005285308,0.00090487604,0.0005989593,0.0028253575,0.0004098422,0.0025690529,0.0012167472,0.0012580797,0.00097130716],"category_scores_gemma":[0.02127709,0.00048739114,0.0007520969,0.0020304827,0.00080286735,0.0026595031,0.0020751976,0.001331088,0.00019131506],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013166627,0.00023129006,0.10827183,0.0002983691,0.00015650853,0.0002806714,0.0004465801,0.8410345,0.0020795115,0.010060027,0.0010085427,0.036000554],"study_design_scores_gemma":[0.0000070449846,0.00010405385,0.028723478,0.00007926697,0.000033023854,0.000078545316,0.0004444903,0.95793486,0.0014918721,0.009708908,0.0013471947,0.000047197194],"about_ca_topic_score_codex":0.005412113,"about_ca_topic_score_gemma":0.005731396,"teacher_disagreement_score":0.005412113,"about_ca_system_score_codex":0.0017457281,"about_ca_system_score_gemma":0.001857739,"threshold_uncertainty_score":0.027951717},"labels":[],"label_agreement":null},{"id":"W4409823998","doi":"10.1080/08963568.2025.2491932","title":"Practical recommendations for improved conduct and reporting: an analysis of business and management systematic reviews","year":2025,"lang":"en","type":"article","venue":"Journal of Business & Finance Librarianship","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Systematic review; Business; Accounting; Knowledge management; Management science; Process management; Computer science; Political science; MEDLINE; Economics; Law","score_opus":0.36188105716363056,"score_gpt":0.45307469378759496,"score_spread":0.0911936366239644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409823998","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":"methods","domain_gemma":"reporting","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":"reporting","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024536217,0.10594862,0.23154436,0.3834622,0.014150389,0.19212866,0.02663052,0.0044875066,0.017111521],"genre_scores_gemma":[0.037138313,0.029933138,0.84481233,0.015250021,0.0009094512,0.06723343,0.0030315246,0.00045242617,0.0012393497],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.1876655,0.5185475,0.22047843,0.0099988235,0.057939727,0.005370086],"domain_scores_gemma":[0.08935286,0.59063935,0.07577191,0.037638526,0.20023772,0.0063596824],"candidate_categories":["metaresearch"],"consensus_categories":["metaresearch"],"category_scores_codex":[0.65749305,0.0066037616,0.010128925,0.06918458,0.0076605952,0.026706377,0.008024168,0.010755159,0.007258268],"category_scores_gemma":[0.87411857,0.0061187954,0.017437264,0.08350138,0.0070503866,0.02347892,0.013029539,0.0137881525,0.002981349],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009579676,0.0004173349,0.01899478,0.35141316,0.010170549,0.0009659129,0.036797147,0.0031656963,0.0027437883,0.02168878,0.13318421,0.4195007],"study_design_scores_gemma":[0.0017068331,0.00080705254,0.027829826,0.6626821,0.019664908,0.0008741586,0.036551006,0.009466707,0.002962937,0.04250217,0.1935321,0.0014201943],"about_ca_topic_score_codex":0.019439671,"about_ca_topic_score_gemma":0.031080062,"teacher_disagreement_score":0.34250695,"about_ca_system_score_codex":0.029731695,"about_ca_system_score_gemma":0.14976636,"threshold_uncertainty_score":0.4223721},"labels":[],"label_agreement":null},{"id":"W4410160557","doi":"10.3390/civileng6020025","title":"Value of Bayesian Pre-Posterior Information for Enhancing Life-Cycle Cost Analysis of Highway Investments","year":2025,"lang":"en","type":"article","venue":"CivilEng","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bayesian probability; Value of information; Value (mathematics); Statistics; Econometrics; Computer science; Economics; Transport engineering; Business; Mathematics; Engineering; Artificial intelligence","score_opus":0.02717210178211833,"score_gpt":0.3425236930181485,"score_spread":0.3153515912360302,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410160557","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017613297,0.0006473464,0.9751276,0.0007706863,0.00004000709,0.00015477484,0.0003190658,0.00012294397,0.005204279],"genre_scores_gemma":[0.5360088,0.0023060173,0.45631063,0.00048080878,0.0002676835,0.00051186513,0.0011418653,0.00024390487,0.0027283935],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9906908,0.0058399877,0.00034010026,0.0006002273,0.0022549734,0.00027385636],"domain_scores_gemma":[0.87368584,0.11247367,0.0037120597,0.0035433827,0.0061435597,0.0004414871],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022071484,0.001900853,0.0021198199,0.004881471,0.0009018097,0.0036279147,0.0019489023,0.0020243332,0.0041882456],"category_scores_gemma":[0.11074667,0.0017209019,0.0019284823,0.002804812,0.001887916,0.008027243,0.0019140972,0.0044917865,0.00043679736],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010609252,0.000078867735,0.0019635095,0.00014767534,0.000092535454,0.000069245,0.000092333576,0.89507645,0.00043298028,0.06311462,0.0007551144,0.03807058],"study_design_scores_gemma":[0.000015791116,0.00004930018,0.0007516552,0.00009419658,0.000048981175,0.00002855701,0.000033591823,0.9307645,0.00051753456,0.06678874,0.0008685868,0.000038667895],"about_ca_topic_score_codex":0.009513279,"about_ca_topic_score_gemma":0.011881783,"teacher_disagreement_score":0.022071484,"about_ca_system_score_codex":0.0034785315,"about_ca_system_score_gemma":0.0033706948,"threshold_uncertainty_score":0.11672652},"labels":[],"label_agreement":null},{"id":"W4410512503","doi":"10.3390/buildings15101733","title":"A Capability Maturity Model for Integrated Project Delivery","year":2025,"lang":"en","type":"article","venue":"Buildings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; École de Technologie Supérieure","funders":"Mitacs","keywords":"Capability Maturity Model; Maturity (psychological); Integrated project delivery; Engineering; Systems engineering; Computer science; Project management; Psychology; Programming language","score_opus":0.08249708516515852,"score_gpt":0.38148534302405984,"score_spread":0.2989882578589013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410512503","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028805044,0.0033138273,0.8427959,0.008667539,0.00013910414,0.0018839098,0.0005632649,0.00041880176,0.11341265],"genre_scores_gemma":[0.50593406,0.0035666395,0.47891006,0.0005811849,0.000059695056,0.003074987,0.0005938452,0.00008653054,0.0071930047],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99112517,0.0042602886,0.00082939194,0.0006393807,0.0024854925,0.00066016265],"domain_scores_gemma":[0.9877721,0.0055920947,0.001237854,0.0007455208,0.003883999,0.0007684032],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013070533,0.0010114074,0.00039390777,0.0054662046,0.0013973368,0.0058407583,0.0018568629,0.002367179,0.003761552],"category_scores_gemma":[0.020236332,0.00055140647,0.0013718461,0.0037964694,0.002648263,0.008894797,0.0039113984,0.0031120053,0.0013432506],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003845857,0.00015706568,0.004123996,0.0007257665,0.000054959743,0.00029752124,0.0056682946,0.022805419,0.0013923672,0.8648725,0.0033125328,0.09655109],"study_design_scores_gemma":[0.00007808706,0.00058419147,0.0073719076,0.0024810776,0.00008450764,0.0008425477,0.0066483472,0.084269114,0.0022091798,0.7104114,0.18479462,0.0002249391],"about_ca_topic_score_codex":0.00818829,"about_ca_topic_score_gemma":0.005302617,"teacher_disagreement_score":0.013070533,"about_ca_system_score_codex":0.0098779425,"about_ca_system_score_gemma":0.012018108,"threshold_uncertainty_score":0.07166976},"labels":[],"label_agreement":null},{"id":"W4410523403","doi":"10.1136/bmjoq-2025-qshu.247","title":"247 Breaking barriers to speaking up for safety: a leadership toolkit to foster a culture of communication openness","year":2025,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University Health Network","funders":"","keywords":"Openness to experience; Knowledge management; Business; Computer science; Public relations; Psychology; Social psychology; Political science","score_opus":0.17393278264095705,"score_gpt":0.4091732086772659,"score_spread":0.23524042603630888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410523403","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37559572,0.000838672,0.32497695,0.09493834,0.0021715544,0.004260288,0.00016229562,0.0070447666,0.1900114],"genre_scores_gemma":[0.76831174,0.00047425285,0.18920876,0.0050727627,0.00016664281,0.002720473,0.00018556145,0.0006107944,0.033249047],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.96480554,0.024104372,0.001262971,0.0014596545,0.00636798,0.0019995198],"domain_scores_gemma":[0.9233772,0.03204433,0.0052034035,0.008714119,0.011228365,0.019432642],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.026496053,0.0007530481,0.00041598483,0.0016396217,0.010372855,0.012184871,0.0032492976,0.0025954896,0.0093284985],"category_scores_gemma":[0.050632495,0.00092801295,0.0007493004,0.00071322994,0.006410299,0.006763774,0.019817352,0.0075073186,0.0034776572],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024575577,0.005014094,0.014664895,0.001360504,0.000112573034,0.0013517032,0.2892824,0.0019398276,0.021952165,0.040204726,0.078304626,0.54556674],"study_design_scores_gemma":[0.00036720565,0.0019492497,0.024689551,0.0026208505,0.00026409072,0.0017628476,0.42553347,0.0086865015,0.025326012,0.07482795,0.43340445,0.00056778383],"about_ca_topic_score_codex":0.002112633,"about_ca_topic_score_gemma":0.0053603,"teacher_disagreement_score":0.026496053,"about_ca_system_score_codex":0.0031073152,"about_ca_system_score_gemma":0.027108444,"threshold_uncertainty_score":0.14012617},"labels":[],"label_agreement":null},{"id":"W4410532512","doi":"10.1016/j.scaman.2025.101431","title":"Meta-organizing on the fly in times of crisis: The emergence and morphing of COVID-END","year":2025,"lang":"en","type":"article","venue":"Scandinavian Journal of Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa; HEC Montréal; University of Toronto; University of Alberta; Université de Montréal","funders":"Canada Excellence Research Chairs, Government of Canada; Social Sciences and Humanities Research Council of Canada; Canada Research Chairs","keywords":"Coronavirus disease 2019 (COVID-19); Morphing; 2019-20 coronavirus outbreak; Severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2); Computer science; Virology; Artificial intelligence; Outbreak; Biology","score_opus":0.10988145424630752,"score_gpt":0.3548885766800748,"score_spread":0.24500712243376727,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410532512","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9144122,0.0012223957,0.019165844,0.008641621,0.00015143024,0.00013701395,0.00008587321,0.00009553172,0.05608803],"genre_scores_gemma":[0.9965166,0.00010294591,0.0020442742,0.00020516336,0.000008426936,0.000028559767,0.000024358254,0.000032780616,0.0010367947],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9900912,0.006731126,0.00027014755,0.0007473253,0.0011461414,0.0010140592],"domain_scores_gemma":[0.9859569,0.0072260518,0.0017012352,0.0018987793,0.001265836,0.001951207],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010528943,0.00035172602,0.0004974723,0.0023544442,0.009613837,0.009669133,0.0016222277,0.0022240968,0.00271481],"category_scores_gemma":[0.018425025,0.000459471,0.0004627776,0.0014623022,0.019223211,0.012278762,0.010865101,0.003074218,0.00036363673],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013658161,0.00010140073,0.021266308,0.00026518301,0.000029101848,0.0024650968,0.8165118,0.0005322043,0.0021417267,0.12550046,0.0022688408,0.02878126],"study_design_scores_gemma":[0.000019489742,0.000119348966,0.012140697,0.00045303407,0.000018293733,0.0011595195,0.8695983,0.0012837135,0.0010313009,0.043506686,0.07059364,0.00007598135],"about_ca_topic_score_codex":0.0022129777,"about_ca_topic_score_gemma":0.004234942,"teacher_disagreement_score":0.010528943,"about_ca_system_score_codex":0.0038567777,"about_ca_system_score_gemma":0.0032840427,"threshold_uncertainty_score":0.055683017},"labels":[],"label_agreement":null},{"id":"W4410592696","doi":"10.1139/cjce-2025-0002","title":"Building beyond barriers: a study of technology integration in Northern Canada’s construction industry","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Windsor","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Construction industry; Engineering; Business; Civil engineering; Architectural engineering; Construction engineering","score_opus":0.013414649445751221,"score_gpt":0.26115042724580934,"score_spread":0.24773577780005812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410592696","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9932314,0.0002047104,0.00019714878,0.0007029727,0.000007975613,0.00010500712,0.00007622161,0.000004402998,0.005470243],"genre_scores_gemma":[0.9939913,0.0005404306,0.0004655547,0.0005314536,0.000004361465,0.000081708444,0.00009643559,0.000009792954,0.0042788982],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9958733,0.000692283,0.00013558463,0.00029023062,0.0011512116,0.0018574165],"domain_scores_gemma":[0.9921942,0.0020152896,0.00090246816,0.00018929176,0.0025331017,0.002165724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003132902,0.0004329638,0.0006217056,0.0019461467,0.01920638,0.0060273856,0.0019536093,0.0010076832,0.002789393],"category_scores_gemma":[0.0073548653,0.0007579189,0.00029474375,0.0057001538,0.004311217,0.0016732918,0.003246437,0.0023674457,0.00027074336],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008040413,0.0003762331,0.09738753,0.00021317057,0.000017467493,0.001686577,0.87426496,0.00024612184,0.0013967454,0.002075579,0.0018371817,0.020418009],"study_design_scores_gemma":[0.0000046774708,0.00006114945,0.065055065,0.00010449886,0.0000085256015,0.000080405574,0.92472166,0.00027213234,0.00015121361,0.00008937733,0.009431659,0.000019535986],"about_ca_topic_score_codex":0.98838717,"about_ca_topic_score_gemma":0.9944371,"teacher_disagreement_score":0.082998425,"about_ca_system_score_codex":0.082998425,"about_ca_system_score_gemma":0.15689811,"threshold_uncertainty_score":0.60219854},"labels":[],"label_agreement":null},{"id":"W4410821979","doi":"10.56330/hxpf9654","title":"Project management failure: The 1976 Montreal Olympics","year":2014,"lang":"en","type":"article","venue":"The Structural Engineer","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering; Geography; Aeronautics; Political science","score_opus":0.029427431332733425,"score_gpt":0.3061675019660838,"score_spread":0.2767400706333504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410821979","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81238526,0.0033002207,0.0014212086,0.059873994,0.0012328802,0.00032595624,0.0013461028,0.00022688931,0.11988751],"genre_scores_gemma":[0.95735526,0.001638632,0.00058259384,0.0027919377,0.00025210535,0.00008551399,0.00034899605,0.000045372497,0.036899563],"study_design_codex":"not_applicable","study_design_gemma":"case_report","domain_scores_codex":[0.9982145,0.00030261785,0.000039406317,0.00010861689,0.0005297117,0.00080522045],"domain_scores_gemma":[0.9975229,0.00026773565,0.00024334685,0.0000721909,0.00062827265,0.0012656669],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016550386,0.00064569694,0.00029319807,0.0012004485,0.011369746,0.0028711709,0.002147462,0.003034586,0.0050319005],"category_scores_gemma":[0.0047830534,0.0003411833,0.0002955629,0.0018637433,0.0031923708,0.0010263044,0.0017845588,0.0030757308,0.0006336301],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004256976,0.0010671272,0.19380106,0.0005055947,0.00022771621,0.053969745,0.06055748,0.019932818,0.0020436142,0.032034863,0.48099822,0.15443613],"study_design_scores_gemma":[0.00012742297,0.00069208245,0.49336326,0.0005972214,0.00006712215,0.003120232,0.12613283,0.0051221773,0.0014217697,0.0027337475,0.36637437,0.00024785995],"about_ca_topic_score_codex":0.86665064,"about_ca_topic_score_gemma":0.95864534,"teacher_disagreement_score":0.13334936,"about_ca_system_score_codex":0.025935372,"about_ca_system_score_gemma":0.016596423,"threshold_uncertainty_score":0.2682693},"labels":[],"label_agreement":null},{"id":"W4410871270","doi":"10.5267/j.jpm.2025.4.002","title":"You are entitled to access the full text of this documentAntecedents of intention to use project management among educational institution: Empirical study in Jordan","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Institution; Psychology; Empirical research; Knowledge management; Medical education; Public relations; Sociology; Business; Political science; Computer science; Medicine; Social science; Epistemology; Philosophy","score_opus":0.11340151513184703,"score_gpt":0.45618771603993175,"score_spread":0.3427862009080847,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410871270","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9972126,0.00009604815,0.00018839279,0.00026098435,0.000004141928,0.000027576001,0.000043976142,0.0000028154436,0.00216348],"genre_scores_gemma":[0.99609995,0.00032807386,0.0003284912,0.00019790171,0.000009476841,0.00005514237,0.000060531504,0.000005812623,0.0029145414],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986268,0.0005552896,0.00011998122,0.00009952419,0.0003546711,0.00024369099],"domain_scores_gemma":[0.9903128,0.0037453987,0.0020741122,0.0004360381,0.0022694536,0.0011622118],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0027470225,0.00012519644,0.0002450964,0.0007991018,0.00096881186,0.0019458242,0.000395641,0.00047398914,0.0066800215],"category_scores_gemma":[0.010708772,0.00021461747,0.00024466723,0.0010216468,0.0006750752,0.0015402605,0.0009848436,0.0009446627,0.0011980365],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015227405,0.0023866,0.8962555,0.00017006996,0.00002315919,0.00043902884,0.03239386,0.00013300973,0.00083616737,0.0008305137,0.0020746996,0.064305216],"study_design_scores_gemma":[0.000019087001,0.0008859417,0.8836286,0.00026417885,0.000038164995,0.000515497,0.100405574,0.0010785735,0.000792543,0.0005244652,0.011806435,0.000040939085],"about_ca_topic_score_codex":0.004093064,"about_ca_topic_score_gemma":0.005068095,"teacher_disagreement_score":0.99332,"about_ca_system_score_codex":0.00070149323,"about_ca_system_score_gemma":0.0018531035,"threshold_uncertainty_score":0.022346854},"labels":[],"label_agreement":null},{"id":"W4410898471","doi":"10.5267/j.dsl.2025.5.005","title":"Enhancing project management performance through green innovation, quality planning and strategic leadership","year":2025,"lang":"en","type":"article","venue":"Decision Science Letters","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Majmaah University","keywords":"Business; Strategic planning; Process management; Quality (philosophy); Green innovation; Strategic leadership; Knowledge management; Marketing; Industrial organization; Computer science","score_opus":0.3178418791090077,"score_gpt":0.45193209570389925,"score_spread":0.13409021659489156,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410898471","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98817736,0.00009835345,0.0019220546,0.0003515696,0.0000039200186,0.000024568346,0.000012355496,0.000012715549,0.009397169],"genre_scores_gemma":[0.9987172,0.00006730972,0.00088934484,0.00001932388,0.000001971953,0.0000053214403,0.000008201049,0.0000013276264,0.00028994045],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9974948,0.0013684711,0.000089311885,0.00010497411,0.00050227565,0.0004402059],"domain_scores_gemma":[0.9926387,0.0025659988,0.0022048445,0.0003229186,0.0010723113,0.001195183],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033224009,0.0002918947,0.00014054966,0.0006261748,0.000615415,0.0025054691,0.00025666752,0.000297371,0.0011433286],"category_scores_gemma":[0.007897213,0.00009350975,0.00017150448,0.0005278911,0.00067864114,0.0009901267,0.0016896977,0.00039530997,0.00024743026],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025975474,0.0015715875,0.5811003,0.00043026498,0.00018819892,0.00040575225,0.0069401064,0.010387078,0.0082085775,0.010101402,0.0017248624,0.37868208],"study_design_scores_gemma":[0.000051518164,0.0020804047,0.9362426,0.00023166343,0.00011449069,0.00032013046,0.019654544,0.014649094,0.008647649,0.0072316444,0.010712141,0.00006422132],"about_ca_topic_score_codex":0.0020548806,"about_ca_topic_score_gemma":0.0037849597,"teacher_disagreement_score":0.0033224009,"about_ca_system_score_codex":0.0011476612,"about_ca_system_score_gemma":0.0033877592,"threshold_uncertainty_score":0.017570794},"labels":[],"label_agreement":null},{"id":"W4411472853","doi":"10.7771/3067-4883.2007","title":"How Innovation is Impacting Productivity in the Construction Industry: A Review and Case Study of the Canadian Research Landscape","year":2025,"lang":"en","type":"review","venue":"CIB Conferences","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Productivity; Business; Engineering; Industrial organization; Economics; Economic growth","score_opus":0.5078543264523077,"score_gpt":0.5254966416176045,"score_spread":0.017642315165296796,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411472853","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":"evaluation","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":"evaluation","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00044808397,0.9982829,0.0000483465,0.0003227343,0.000032053733,0.000008005298,0.000024953879,0.0000015215128,0.00083139545],"genre_scores_gemma":[0.0045091156,0.995112,0.00013236326,0.00010751149,0.000018831595,0.00000672672,0.000017186325,0.0000011039984,0.000095124175],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977214,0.00053059036,0.00035446242,0.00020902655,0.0010064131,0.00017809727],"domain_scores_gemma":[0.989267,0.0067133214,0.0009788149,0.00012759028,0.0026043025,0.00030901987],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.0042624543,0.000756328,0.0015792277,0.0103220325,0.0011032966,0.003513336,0.0012235799,0.0013151198,0.0015445175],"category_scores_gemma":[0.009417152,0.00037113484,0.0010688901,0.023998987,0.0016585112,0.0015630487,0.0009579139,0.0010603201,0.00020004874],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010055113,0.00006537087,0.0027558042,0.18090004,0.000566903,0.00051938486,0.0027696642,0.0007486528,0.00073637813,0.008539819,0.011918928,0.79037845],"study_design_scores_gemma":[0.000023825121,0.00018934373,0.027574418,0.17113493,0.0027433613,0.0012512761,0.0045213257,0.00029618383,0.000832608,0.0022845652,0.789017,0.00013112767],"about_ca_topic_score_codex":0.31439438,"about_ca_topic_score_gemma":0.535705,"teacher_disagreement_score":0.99573755,"about_ca_system_score_codex":0.013694823,"about_ca_system_score_gemma":0.04528078,"threshold_uncertainty_score":0.6251288},"labels":[],"label_agreement":null},{"id":"W4411472959","doi":"10.7771/3067-4883.1981","title":"Building Together: Premises for applying IPD in Brazilian Construction","year":2025,"lang":"en","type":"article","venue":"CIB Conferences","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Premises; Architectural engineering; Construction engineering; Business; Computer science; Engineering; Political science; Law","score_opus":0.08759254740193931,"score_gpt":0.4024289225360036,"score_spread":0.31483637513406426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411472959","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2582303,0.007726973,0.1234685,0.10364181,0.00049530214,0.002309931,0.0002584592,0.00023328574,0.50363547],"genre_scores_gemma":[0.9366795,0.0024630353,0.052707944,0.0026251336,0.00004679858,0.0007674454,0.000085152904,0.00003988544,0.0045852577],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97968024,0.012915379,0.0011595635,0.0014536225,0.0029942764,0.0017968991],"domain_scores_gemma":[0.9724845,0.01347157,0.0017639647,0.0044393283,0.0051184343,0.0027221702],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.024892835,0.00052855216,0.00047323343,0.0017659755,0.0059064836,0.008403575,0.002001256,0.0019272555,0.008073187],"category_scores_gemma":[0.05439208,0.0006666823,0.000708551,0.0023740623,0.008176166,0.007480942,0.0146596115,0.0033354785,0.0010675925],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013063922,0.0006365663,0.039755683,0.00249527,0.000048249283,0.001427927,0.16726166,0.0012171544,0.0037722664,0.3010685,0.0061521833,0.47603387],"study_design_scores_gemma":[0.00011715623,0.0006788029,0.04482585,0.009323575,0.000120482015,0.0013490823,0.33040982,0.0038713133,0.0026305655,0.13824917,0.46832138,0.00010279705],"about_ca_topic_score_codex":0.021892333,"about_ca_topic_score_gemma":0.028872492,"teacher_disagreement_score":0.024892835,"about_ca_system_score_codex":0.0077680894,"about_ca_system_score_gemma":0.023633366,"threshold_uncertainty_score":0.13164747},"labels":[],"label_agreement":null},{"id":"W4411472993","doi":"10.7771/3067-4883.1915","title":"Advancing Off-Site Construction: Assessing Organizational Maturity and Capabilities in the Canadian Construction Industry","year":2025,"lang":"en","type":"article","venue":"CIB Conferences","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"National Research Council Canada; University of New Brunswick","funders":"National Research Council Canada; University of Waterloo; University of Alberta","keywords":"Maturity (psychological); Construction industry; Business; Capability Maturity Model; Process management; Engineering; Construction engineering; Computer science; Political science","score_opus":0.03827217113092435,"score_gpt":0.3324114681798269,"score_spread":0.29413929704890257,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411472993","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9576408,0.00050025363,0.0019921435,0.00061428995,0.000014800568,0.00033841142,0.00065559894,0.00003256456,0.03821104],"genre_scores_gemma":[0.9905319,0.0005510498,0.0036062987,0.000045511537,0.0000027028375,0.00008798787,0.0006753709,0.000010546986,0.0044884924],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9969125,0.00029738643,0.00010457619,0.00016296923,0.0018144399,0.0007080424],"domain_scores_gemma":[0.9919161,0.00054852694,0.0006296496,0.00019994684,0.0052028643,0.001502943],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034347335,0.0005631695,0.00026322325,0.0071993144,0.005059761,0.003558077,0.0014264766,0.0006443789,0.0030303465],"category_scores_gemma":[0.009031096,0.00029224475,0.0003946014,0.0051340405,0.0018897995,0.0014243977,0.0033652913,0.0007235921,0.00036238515],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022221259,0.00044665698,0.6601796,0.00039835434,0.000077560515,0.00035518513,0.057030562,0.0036913536,0.0025580134,0.011595216,0.0069390433,0.25650615],"study_design_scores_gemma":[0.000010818777,0.00015293682,0.8930099,0.00022274913,0.00003551077,0.00007552921,0.07468716,0.0050592083,0.0011201263,0.001071229,0.02446942,0.00008538713],"about_ca_topic_score_codex":0.98020214,"about_ca_topic_score_gemma":0.9929,"teacher_disagreement_score":0.05773637,"about_ca_system_score_codex":0.05773637,"about_ca_system_score_gemma":0.066679485,"threshold_uncertainty_score":0.4189086},"labels":[],"label_agreement":null},{"id":"W4411473534","doi":"10.7771/3067-4883.1757","title":"Using Large Language Models to Identify Project Risks for Sustainable Operations","year":2025,"lang":"en","type":"article","venue":"CIB Conferences","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Risk analysis (engineering); Computer science; Business","score_opus":0.3390174132539431,"score_gpt":0.5146820390868965,"score_spread":0.1756646258329534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411473534","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09465791,0.0006983824,0.8884325,0.0026424835,0.0001426649,0.00047157044,0.002804335,0.0032548604,0.00689521],"genre_scores_gemma":[0.5837673,0.00044278844,0.40807757,0.0003698001,0.00007171692,0.0007287517,0.0040408825,0.00024735837,0.0022537955],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9964143,0.0024337124,0.00022137846,0.00047536098,0.00035589503,0.00009927007],"domain_scores_gemma":[0.97871655,0.018330153,0.0009918868,0.00080597965,0.00094031484,0.00021525797],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052242824,0.0013750095,0.00046118055,0.001997953,0.0006374491,0.0029235804,0.0013657088,0.0011947646,0.0042124544],"category_scores_gemma":[0.02446507,0.00051227986,0.0014704193,0.0011255565,0.00066732336,0.0039331443,0.0022071167,0.0020777332,0.0015143198],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007084678,0.00077201496,0.04121338,0.0014086145,0.0005313795,0.001099943,0.006880609,0.4435147,0.010010582,0.0410426,0.01608001,0.43673772],"study_design_scores_gemma":[0.000041030504,0.00012635405,0.003554171,0.0003203058,0.00011446478,0.00019732356,0.0014288095,0.9157298,0.003043735,0.061623506,0.013741395,0.00007902474],"about_ca_topic_score_codex":0.0066738483,"about_ca_topic_score_gemma":0.013578267,"teacher_disagreement_score":0.0066738483,"about_ca_system_score_codex":0.0015247675,"about_ca_system_score_gemma":0.0021066812,"threshold_uncertainty_score":0.027629018},"labels":[],"label_agreement":null},{"id":"W4411521643","doi":"10.36487/acg_repo/2435_a-12","title":"Caving resources and reserves: Defining a process for understanding variability and appropriate classification across global codes through project life","year":2024,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Process (computing); Computer science; Environmental resource management; Environmental science","score_opus":0.3026970489807555,"score_gpt":0.46213006990971806,"score_spread":0.15943302092896255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411521643","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.094444804,0.0001424907,0.8921206,0.0019241769,0.00002724433,0.0003606258,0.00046020345,0.00053787127,0.0099820895],"genre_scores_gemma":[0.5986574,0.00014529646,0.39723212,0.00017316513,0.000024752997,0.00047129195,0.0005750633,0.000326522,0.0023943335],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9899922,0.0045008757,0.0006373501,0.0021006786,0.0022366683,0.00053220155],"domain_scores_gemma":[0.94795656,0.02804685,0.007682911,0.008502534,0.0067549073,0.0010563118],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021542408,0.0005795319,0.0005619898,0.0031591032,0.0018672157,0.006181335,0.002380727,0.0013548086,0.0022925015],"category_scores_gemma":[0.07992367,0.00078821933,0.0010859532,0.0025891415,0.005386353,0.0107622575,0.004401057,0.002842365,0.00047286143],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015791856,0.00016563483,0.23311332,0.00018935955,0.0001081031,0.000417828,0.021351634,0.122588545,0.0025693618,0.3950149,0.0039291573,0.22039418],"study_design_scores_gemma":[0.000025403564,0.00021331735,0.08445423,0.00042633252,0.00004460791,0.00034123016,0.007639207,0.37226468,0.004772693,0.4940058,0.035591707,0.00022083169],"about_ca_topic_score_codex":0.022463031,"about_ca_topic_score_gemma":0.01488356,"teacher_disagreement_score":0.022463031,"about_ca_system_score_codex":0.0039828923,"about_ca_system_score_gemma":0.0036795838,"threshold_uncertainty_score":0.11392856},"labels":[],"label_agreement":null},{"id":"W4411656100","doi":"10.51847/hq2auznmcq","title":"10.51847/Hq2aUznMcQ","year":2000,"lang":"en","type":"article","venue":"Time to knit","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Identification (biology); Selection (genetic algorithm); Construction engineering; Business; Computer science; Engineering; Artificial intelligence; Biology","score_opus":0.035103246397714324,"score_gpt":0.2780483292596286,"score_spread":0.24294508286191424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411656100","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009455092,0.0004809593,0.0029219673,0.0016714523,0.00046876504,0.00021053979,0.002233419,0.0015255896,0.9810322],"genre_scores_gemma":[0.017283125,0.00020468538,0.0021113819,0.00041712847,0.00006251977,0.00011654327,0.0011985562,0.00022406875,0.978382],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99935585,0.00012729426,0.000057197314,0.00012914209,0.00020212351,0.00012835776],"domain_scores_gemma":[0.9986166,0.00030691217,0.0000904996,0.00019590632,0.0005338372,0.00025634572],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00093689683,0.00062338175,0.00046108715,0.0019657305,0.00096044847,0.0025174874,0.0007325833,0.0018650885,0.9382078],"category_scores_gemma":[0.0017582655,0.00029011795,0.00034793987,0.0018564006,0.0007381039,0.0014460414,0.0019045976,0.0006994678,0.888741],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024773783,0.0003046093,0.0056020566,0.0003323104,0.000016861697,0.00021906929,0.00022796859,0.00043162308,0.001835538,0.0067711454,0.20320593,0.7808053],"study_design_scores_gemma":[0.000078096506,0.000095976924,0.008501013,0.00026585686,0.000013776454,0.00028709788,0.00041579833,0.0010883606,0.00083169417,0.0014944363,0.9869031,0.000024887955],"about_ca_topic_score_codex":0.012054966,"about_ca_topic_score_gemma":0.0104832975,"teacher_disagreement_score":0.061792195,"about_ca_system_score_codex":0.0013430077,"about_ca_system_score_gemma":0.0010610552,"threshold_uncertainty_score":0.08813906},"labels":[],"label_agreement":null},{"id":"W4411656217","doi":"10.51847/wfmvqn5bd0","title":"10.51847/WfmvQN5bd0","year":2000,"lang":"en","type":"article","venue":"Time to knit","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prioritization; Gray (unit); Identification (biology); Computer science; Construction engineering; Risk analysis (engineering); Engineering; Business; Management science; Medicine","score_opus":0.035103246397714324,"score_gpt":0.2780483292596286,"score_spread":0.24294508286191424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411656217","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019457785,0.0003957493,0.005163755,0.00076405064,0.00055270497,0.00015607505,0.0015662313,0.0018742508,0.9875814],"genre_scores_gemma":[0.0035810422,0.00019080231,0.0019006415,0.00025397338,0.00004513246,0.000052390034,0.0009808491,0.0002895868,0.99270564],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995919,0.000039694063,0.000029969822,0.00011402008,0.00014380069,0.00008059674],"domain_scores_gemma":[0.99911934,0.00017064452,0.00003768779,0.00014784792,0.00033715062,0.00018737343],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000817618,0.0011841153,0.00062547694,0.0022023816,0.0010866547,0.0023949472,0.0013162217,0.003475209,0.964189],"category_scores_gemma":[0.0013506474,0.000526945,0.0005305692,0.0021852604,0.0008527547,0.002161674,0.0017738052,0.00090429856,0.9633146],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021481988,0.00017032283,0.0010927365,0.00029775026,0.000017570206,0.00018032326,0.000088740744,0.00056319166,0.004006559,0.0060730167,0.25205007,0.73524487],"study_design_scores_gemma":[0.000046608973,0.000049123606,0.00089150807,0.00017570546,0.00001186155,0.00019587121,0.000092712115,0.0008600397,0.001381305,0.001587776,0.9946892,0.000018324528],"about_ca_topic_score_codex":0.009035253,"about_ca_topic_score_gemma":0.007159442,"teacher_disagreement_score":0.035811007,"about_ca_system_score_codex":0.0011563314,"about_ca_system_score_gemma":0.0006711355,"threshold_uncertainty_score":0.051080048},"labels":[],"label_agreement":null},{"id":"W4411658719","doi":"10.51847/x1y3wn3vxj","title":"10.51847/X1Y3Wn3VxJ","year":2000,"lang":"en","type":"article","venue":"Time to knit","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Risk assessment; Risk analysis (engineering); Computer science; Computer security","score_opus":0.035103246397714324,"score_gpt":0.2780483292596286,"score_spread":0.24294508286191424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411658719","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014597813,0.00013672443,0.001134712,0.00039537164,0.00026794375,0.00008894259,0.0009084394,0.0008481524,0.99476],"genre_scores_gemma":[0.0017304597,0.00009243683,0.0005546506,0.00010831176,0.000027086307,0.000041786945,0.0006652425,0.00018902989,0.996591],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.999632,0.000023715953,0.000025815876,0.00009134673,0.00013754549,0.00008956497],"domain_scores_gemma":[0.9993262,0.00013332818,0.00003526332,0.00009512637,0.00020709558,0.00020303034],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00054104225,0.0010118271,0.0005488385,0.0019061028,0.0013618182,0.0025929296,0.00092303904,0.0024867519,0.97310424],"category_scores_gemma":[0.0009947086,0.0004258454,0.00055348006,0.0018004571,0.00069326477,0.0017383405,0.0018660866,0.0009378372,0.9662524],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021499106,0.0002583315,0.0015156793,0.00036213102,0.000019491528,0.00018467651,0.00013517911,0.00033888692,0.004559472,0.0068040877,0.34825003,0.63735706],"study_design_scores_gemma":[0.00003997149,0.000055905963,0.0015687905,0.00014049746,0.000010419174,0.0001621633,0.00013381708,0.00032182646,0.0008901083,0.00077471504,0.99588877,0.000013088505],"about_ca_topic_score_codex":0.007590437,"about_ca_topic_score_gemma":0.007113412,"teacher_disagreement_score":0.026895761,"about_ca_system_score_codex":0.00090189354,"about_ca_system_score_gemma":0.0008685584,"threshold_uncertainty_score":0.038363457},"labels":[],"label_agreement":null},{"id":"W4411658787","doi":"10.1177/87569728251347214","title":"Wing It! Enacting Project Team Resilience in Response to Major Unexpected Events","year":2025,"lang":"en","type":"article","venue":"Project Management Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"Fonds de Recherche du Québec-Société et Culture","keywords":"Resilience (materials science); Wing; Engineering; Process management; Aeronautics; Knowledge management; Business; Sociology; Engineering ethics; Operations management; Computer science","score_opus":0.058265198567967476,"score_gpt":0.4027157336285952,"score_spread":0.3444505350606277,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411658787","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38917884,0.0011494919,0.14492592,0.07878803,0.001272937,0.00050541403,0.00017324272,0.0015530355,0.38245305],"genre_scores_gemma":[0.9636177,0.00036429963,0.018332051,0.0011990087,0.00005149414,0.00010284159,0.000040332194,0.00009606693,0.016196199],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.996696,0.0021227335,0.000074596406,0.00013605662,0.0004283172,0.00054223044],"domain_scores_gemma":[0.9959235,0.0016307102,0.00059875735,0.00042078653,0.00052656315,0.00089968124],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004819243,0.00031873223,0.00017017429,0.0006617905,0.0033083826,0.004155275,0.0006991679,0.001551717,0.008236581],"category_scores_gemma":[0.011051014,0.00018031146,0.0003174428,0.00043894284,0.0046198163,0.004435188,0.006611618,0.0015262796,0.0015550827],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044322916,0.00037136348,0.02179058,0.0006339635,0.00006941897,0.0021172864,0.14532861,0.0091871545,0.010196615,0.35286102,0.09656265,0.3604382],"study_design_scores_gemma":[0.000063560954,0.00079575944,0.018427413,0.0012298502,0.00007039711,0.0011213678,0.2232733,0.021342002,0.008336592,0.19057982,0.53453666,0.00022333038],"about_ca_topic_score_codex":0.0038507732,"about_ca_topic_score_gemma":0.005746715,"teacher_disagreement_score":0.008236581,"about_ca_system_score_codex":0.0015707472,"about_ca_system_score_gemma":0.0032283864,"threshold_uncertainty_score":0.027554154},"labels":[],"label_agreement":null},{"id":"W4411896104","doi":"10.3390/su17135999","title":"Toward Sustainable Project Management Practices: Lessons from the COVID-19 Pandemic Using the Most Significant Change Method","year":2025,"lang":"en","type":"article","venue":"Sustainability","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université de Montréal; Université du Québec à Montréal","funders":"","keywords":"Coronavirus disease 2019 (COVID-19); Pandemic; 2019-20 coronavirus outbreak; Severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2); Change management (ITSM); Sustainable development; Environmental planning; Environmental resource management; Business; Virology; Political science; Engineering; Geography; Operations management; Medicine; Environmental science; Outbreak","score_opus":0.4094228420267109,"score_gpt":0.5268996041615598,"score_spread":0.11747676213484887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411896104","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84849375,0.0017874406,0.042406246,0.042407025,0.00019577135,0.001003858,0.00026298958,0.00013302876,0.06330991],"genre_scores_gemma":[0.9689757,0.0010682519,0.023762304,0.0012616406,0.00002737835,0.00044533613,0.0000846605,0.00005930226,0.004315333],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9754304,0.019554289,0.0003352791,0.0007595286,0.002475686,0.0014447834],"domain_scores_gemma":[0.96988475,0.02050071,0.0012978744,0.0020523404,0.004260898,0.0020034849],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.029715559,0.000623733,0.0003711209,0.002062391,0.01207624,0.006588945,0.0024479006,0.0016216377,0.0023805844],"category_scores_gemma":[0.025487065,0.00039905994,0.00031807568,0.0026476975,0.018388215,0.004670269,0.0074193566,0.0028618115,0.00026332468],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007803779,0.00015500675,0.0219164,0.00033977625,0.000019709603,0.0010440006,0.8130202,0.00082354917,0.0010070695,0.020677282,0.007687869,0.13323103],"study_design_scores_gemma":[0.000027704393,0.00015246487,0.019389432,0.00069331966,0.000020304507,0.00036190762,0.8633801,0.002028684,0.0010301312,0.00969852,0.103147134,0.00007031221],"about_ca_topic_score_codex":0.30078563,"about_ca_topic_score_gemma":0.6083953,"teacher_disagreement_score":0.30078563,"about_ca_system_score_codex":0.027347429,"about_ca_system_score_gemma":0.0341703,"threshold_uncertainty_score":0.5980697},"labels":[],"label_agreement":null},{"id":"W4412254224","doi":"","title":"Reglerne om entreprenørens projektering i udkastet til AB 18","year":2018,"lang":"da","type":"article","venue":"Research at the University of Copenhagen (University of Copenhagen)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute on Governance","funders":"","keywords":"Traditional medicine; Medicine","score_opus":0.19780364741661516,"score_gpt":0.37322892256571805,"score_spread":0.1754252751491029,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412254224","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37494364,0.0064619626,0.032083098,0.021522382,0.0028203342,0.0011281772,0.003365065,0.0019277796,0.55574757],"genre_scores_gemma":[0.719248,0.004241936,0.029116752,0.0016894703,0.00044116835,0.0009370724,0.0031223327,0.0012079882,0.23999535],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.97653323,0.0053233146,0.0017819249,0.0020816647,0.011419392,0.0028604227],"domain_scores_gemma":[0.9604355,0.010949426,0.0035566457,0.005288612,0.011407083,0.008362831],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020208947,0.0007995352,0.00068257115,0.0025827927,0.0031250832,0.010966267,0.0017818258,0.0017612393,0.053635452],"category_scores_gemma":[0.04299084,0.000762816,0.0008551124,0.0025808453,0.00234649,0.0048247417,0.00832658,0.003777349,0.016926209],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020853805,0.0014560962,0.03587545,0.001740847,0.00013738366,0.00062903354,0.037469666,0.0042620115,0.010370373,0.04512267,0.06643401,0.79441696],"study_design_scores_gemma":[0.00013314556,0.0010216216,0.06797904,0.0013852885,0.000094650444,0.00037636515,0.023265598,0.001111328,0.012376315,0.021983093,0.870082,0.00019156859],"about_ca_topic_score_codex":0.014014554,"about_ca_topic_score_gemma":0.020304414,"teacher_disagreement_score":0.053635452,"about_ca_system_score_codex":0.005889053,"about_ca_system_score_gemma":0.019530687,"threshold_uncertainty_score":0.17942846},"labels":[],"label_agreement":null},{"id":"W4412256452","doi":"","title":"Theoretical conclusions emanating from the project’s activities","year":2013,"lang":"en","type":"article","venue":"Research at the University of Copenhagen (University of Copenhagen)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Centre for International Governance Innovation","funders":"","keywords":"Computer science","score_opus":0.12214483320454009,"score_gpt":0.35917716527299864,"score_spread":0.23703233206845856,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412256452","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22932747,0.0008942146,0.14639656,0.031775292,0.00030266916,0.0002907319,0.00032957928,0.00008278027,0.59060067],"genre_scores_gemma":[0.9814043,0.000637194,0.01230997,0.00040624492,0.000050802337,0.00022964968,0.00017354469,0.000025243151,0.0047629466],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99497247,0.0024764386,0.00023239494,0.0005262432,0.0011639278,0.00062860677],"domain_scores_gemma":[0.98113084,0.013445568,0.000831293,0.0012942966,0.0023991715,0.00089868606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007838363,0.0006134687,0.00035015072,0.0021788224,0.002199485,0.0072898916,0.0020582618,0.0023726174,0.012149516],"category_scores_gemma":[0.019500535,0.0003704952,0.0007849116,0.0017458625,0.009524546,0.0065190424,0.002537653,0.0025571163,0.0012175106],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033210414,0.00006687896,0.00090151175,0.00009467004,0.000007578961,0.000058900652,0.0030904778,0.0010645044,0.00015264543,0.9877221,0.0004898121,0.006317786],"study_design_scores_gemma":[0.00005177334,0.000060266222,0.0029663267,0.00028169798,0.000028502873,0.00011230762,0.01088214,0.0063559134,0.0015073038,0.96298283,0.014755127,0.00001584239],"about_ca_topic_score_codex":0.0019046691,"about_ca_topic_score_gemma":0.0012086434,"teacher_disagreement_score":0.012149516,"about_ca_system_score_codex":0.0036685995,"about_ca_system_score_gemma":0.0055907173,"threshold_uncertainty_score":0.04145378},"labels":[],"label_agreement":null},{"id":"W4412271526","doi":"","title":"Formkrav og frister i entreprisekontrakter:en analyse af præklusion som retligt redskab til styring af ændringer i byggeaftaler","year":2012,"lang":"da","type":"article","venue":"Research at the University of Copenhagen (University of Copenhagen)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute on Governance","funders":"","keywords":"Humanities; Art","score_opus":0.09362932388093141,"score_gpt":0.33689381661916235,"score_spread":0.24326449273823092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412271526","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9704588,0.006180334,0.004376123,0.0017113847,0.0001229492,0.00017669228,0.0017702682,0.000045746932,0.015157765],"genre_scores_gemma":[0.9746617,0.0026248337,0.0031300983,0.00023449938,0.00004208037,0.00017496804,0.0017349158,0.00013011576,0.017266786],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9847846,0.0050083,0.0011473163,0.0028391448,0.004369021,0.0018516112],"domain_scores_gemma":[0.9835173,0.010771949,0.0020301258,0.0011359929,0.0014683838,0.0010762614],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012091104,0.0011276036,0.0017626717,0.0034577996,0.001715147,0.011749168,0.0021052405,0.0015952437,0.019980054],"category_scores_gemma":[0.027281584,0.00092502875,0.0023083626,0.0042526945,0.0034654615,0.00490396,0.0065516275,0.003290453,0.0026790663],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022128955,0.0016004035,0.4822865,0.002083809,0.0016562273,0.0016214071,0.12469217,0.004514423,0.0011399889,0.023198914,0.0073580933,0.34763518],"study_design_scores_gemma":[0.000105338804,0.0008652143,0.66558826,0.0030825965,0.001329561,0.0013043066,0.2145271,0.002460357,0.002911245,0.011692839,0.09588934,0.00024383997],"about_ca_topic_score_codex":0.03873617,"about_ca_topic_score_gemma":0.034079943,"teacher_disagreement_score":0.03873617,"about_ca_system_score_codex":0.005567757,"about_ca_system_score_gemma":0.005412321,"threshold_uncertainty_score":0.07702136},"labels":[],"label_agreement":null},{"id":"W4412591552","doi":"10.1145/3744169.3744170","title":"Sociotechnical Remantling","year":2025,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Sociotechnical system; Computer science; Knowledge management","score_opus":0.1129888293576878,"score_gpt":0.4759871031913381,"score_spread":0.3629982738336503,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412591552","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.055990104,0.00049723225,0.18280599,0.0028234834,0.00036473642,0.00049584714,0.0003145256,0.001405768,0.7553023],"genre_scores_gemma":[0.5699491,0.0006091632,0.083143145,0.0010125949,0.00014098355,0.00053811603,0.00075382617,0.00043497744,0.34341806],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9962096,0.0018033733,0.00016720417,0.00044575852,0.0010749851,0.0002990129],"domain_scores_gemma":[0.9953466,0.0013806436,0.0002835389,0.0018301227,0.00091553316,0.00024345405],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038165112,0.0006216437,0.00023005463,0.0023647759,0.0021386286,0.0037982408,0.0012568245,0.0012209975,0.047227476],"category_scores_gemma":[0.008091399,0.00030038142,0.0006744058,0.00092504773,0.0019715051,0.0033400168,0.0046799323,0.0013046607,0.012569048],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007615824,0.00029026202,0.004589526,0.00026434404,0.000022749784,0.00078806456,0.0072984425,0.0029902232,0.009627515,0.645557,0.013269967,0.3152257],"study_design_scores_gemma":[0.000026263227,0.00027304553,0.009157226,0.0002959584,0.00003267184,0.0013340825,0.0069486084,0.019377876,0.014281625,0.24700531,0.70121235,0.000055040455],"about_ca_topic_score_codex":0.0024193977,"about_ca_topic_score_gemma":0.003749859,"teacher_disagreement_score":0.047227476,"about_ca_system_score_codex":0.0017077725,"about_ca_system_score_gemma":0.0022618833,"threshold_uncertainty_score":0.15799165},"labels":[],"label_agreement":null},{"id":"W4412691087","doi":"10.22260/isarc2025/0075","title":"Fuzzy-Chaos Framework for Analyzing and Quantifying Uncertainty in Labour Productivity in Complex Construction Environments","year":2025,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Productivity; CHAOS (operating system); Fuzzy logic; Computer science; Chaos theory; Fuzzy set; Artificial intelligence; Management science; Economics; Chaotic; Macroeconomics; Computer security","score_opus":0.09724016585993371,"score_gpt":0.37007734854087093,"score_spread":0.2728371826809372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412691087","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025776071,0.00021167894,0.97113264,0.00013670734,0.000017911181,0.000047843296,0.00008060097,0.000057290203,0.0025393358],"genre_scores_gemma":[0.8696078,0.00037283674,0.12872754,0.000036088004,0.000055158245,0.0001607506,0.00009196737,0.000020218433,0.000927666],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99904853,0.00042638357,0.00006258053,0.000104865445,0.00028263652,0.00007503893],"domain_scores_gemma":[0.99788046,0.0014920958,0.00026134853,0.00008376766,0.00021302754,0.00006931799],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002139849,0.0008091527,0.0005743218,0.002514875,0.00065672636,0.0016131579,0.0006161985,0.0005622132,0.00089695386],"category_scores_gemma":[0.0048205126,0.0002685292,0.0009742513,0.0012180976,0.0015705858,0.0015615196,0.0011664979,0.00068689446,0.00008779386],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005180215,0.000025716197,0.0034751382,0.00010099109,0.0000929461,0.00015348823,0.00033359323,0.8517852,0.00204998,0.118799165,0.00028419762,0.02284774],"study_design_scores_gemma":[0.0000044850112,0.000035194917,0.000993419,0.000020450654,0.000013968775,0.000039068127,0.00010265025,0.92844754,0.00052266003,0.069147676,0.00064652937,0.000026306685],"about_ca_topic_score_codex":0.00450131,"about_ca_topic_score_gemma":0.0026500972,"teacher_disagreement_score":0.00450131,"about_ca_system_score_codex":0.0015772494,"about_ca_system_score_gemma":0.0009981722,"threshold_uncertainty_score":0.011443734},"labels":[],"label_agreement":null},{"id":"W4412754696","doi":"10.11159/iccste25.304","title":"A Dual-Factor Structural Model for Assessing the Determinants of Prefabrication and Modular Construction Uptake in India","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Modular design; Dual (grammatical number); Modular construction; Factor (programming language); Computer science; Civil engineering; Engineering; Programming language","score_opus":0.042972799712248565,"score_gpt":0.32112488745975587,"score_spread":0.2781520877475073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754696","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9758288,0.00045200757,0.014018276,0.0012764169,0.000074929485,0.00036741758,0.0006870938,0.00012713678,0.0071678692],"genre_scores_gemma":[0.99218774,0.00026537734,0.0052555464,0.00006795866,0.000017915609,0.00024238211,0.00037528278,0.000015609232,0.0015723117],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99668,0.0014505722,0.00017971026,0.00057775486,0.0003976232,0.00071427075],"domain_scores_gemma":[0.9910419,0.005658621,0.0010351631,0.00048328427,0.0012452416,0.0005358446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0042016213,0.001163238,0.0010125914,0.003319833,0.0016132693,0.003840429,0.002385401,0.001388233,0.0049883532],"category_scores_gemma":[0.009457613,0.00094395597,0.00340747,0.0030496349,0.0017603993,0.0015440263,0.0028012614,0.0023987188,0.00071502355],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000682456,0.0012597168,0.83117026,0.0006292268,0.0012469817,0.0020808978,0.017793292,0.05367151,0.001173472,0.03652064,0.0042949766,0.049476642],"study_design_scores_gemma":[0.00024966768,0.0012987884,0.4684988,0.000833103,0.0017880173,0.00112253,0.026845489,0.46552068,0.00092891953,0.022263631,0.010352452,0.00029795538],"about_ca_topic_score_codex":0.07616673,"about_ca_topic_score_gemma":0.049937066,"teacher_disagreement_score":0.07616673,"about_ca_system_score_codex":0.004612146,"about_ca_system_score_gemma":0.006952613,"threshold_uncertainty_score":0.15144676},"labels":[],"label_agreement":null},{"id":"W4412754728","doi":"10.11159/iccste25.132","title":"The Use of 4IR by Architects in Prevention of Pre-Construction Project Delays in South Africa","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Construction engineering; Architectural engineering; Engineering","score_opus":0.0497772641749989,"score_gpt":0.2912690727356912,"score_spread":0.2414918085606923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754728","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9804441,0.0008519434,0.0018607001,0.0019944361,0.000033166518,0.00010316388,0.000022431916,0.000050003542,0.014640021],"genre_scores_gemma":[0.9972293,0.00034400317,0.0014118988,0.00006704926,0.0000030092954,0.000023746725,0.000005211053,0.0000039006327,0.0009119177],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99448293,0.0035814766,0.00016456308,0.00024073152,0.0006409841,0.0008892583],"domain_scores_gemma":[0.9828865,0.008324272,0.003915424,0.0006928223,0.0020045228,0.0021764182],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0068293964,0.00027136746,0.00021768281,0.0015342713,0.0024823935,0.001922719,0.0009440136,0.0005509132,0.0044134245],"category_scores_gemma":[0.023185287,0.00035255187,0.00019190482,0.00095212506,0.0017074879,0.0015833774,0.00319069,0.00092388195,0.00034650607],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052606745,0.0006685376,0.27592802,0.0015066217,0.00004269496,0.0028949033,0.28801218,0.0015659479,0.005202303,0.006473185,0.0036309292,0.4135487],"study_design_scores_gemma":[0.00004978454,0.0018461187,0.40318245,0.0021177283,0.000106225445,0.0023973584,0.5048672,0.0032434058,0.0051613236,0.002834716,0.07402784,0.00016587773],"about_ca_topic_score_codex":0.010520594,"about_ca_topic_score_gemma":0.024128927,"teacher_disagreement_score":0.010520594,"about_ca_system_score_codex":0.0027154656,"about_ca_system_score_gemma":0.009224345,"threshold_uncertainty_score":0.036117733},"labels":[],"label_agreement":null},{"id":"W4412870777","doi":"10.24908/pceea.2025.19528","title":"Accelerating Climate Change Adaptation (CCA) Education for the Next Generation of Engineering Professionals","year":2025,"lang":"en","type":"article","venue":"Proceedings of the Canadian Engineering Education Association (CEEA)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"Natural Resources Canada; University of Waterloo","keywords":"Adaptation (eye); Climate change; Climate change adaptation; Engineering ethics; Engineering management; Environmental science; Computer science; Engineering; Psychology; Geology","score_opus":0.13424389570031162,"score_gpt":0.3381057947835651,"score_spread":0.2038618990832535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412870777","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4545757,0.0037285455,0.025109725,0.11853819,0.00067189895,0.0005794181,0.00044722538,0.0010763601,0.3952729],"genre_scores_gemma":[0.9146765,0.0038666741,0.03844251,0.0045567187,0.000103354236,0.000117859214,0.00033435907,0.00005619229,0.037845917],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9985415,0.00018378074,0.00002764877,0.00008857255,0.00053645717,0.00062213023],"domain_scores_gemma":[0.99463576,0.0005834586,0.00021641565,0.00017257863,0.0010949535,0.0032967723],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022814407,0.00020119322,0.00013285178,0.0005453769,0.003605122,0.0024703483,0.00081594853,0.0010204114,0.007358138],"category_scores_gemma":[0.0044581043,0.00013481641,0.00021894088,0.00060248876,0.0014733579,0.0010526729,0.0035575307,0.0015395324,0.0010703758],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004052045,0.0015222003,0.06288242,0.00056796474,0.000016563874,0.00029656777,0.026133949,0.0034973612,0.0063417903,0.04071457,0.13786693,0.7201192],"study_design_scores_gemma":[0.00003054558,0.00032392066,0.17919062,0.00090171833,0.000031518866,0.0004102607,0.040905897,0.0034916266,0.0043817163,0.025064154,0.74519664,0.00007138538],"about_ca_topic_score_codex":0.5084341,"about_ca_topic_score_gemma":0.79725707,"teacher_disagreement_score":0.5084341,"about_ca_system_score_codex":0.011322073,"about_ca_system_score_gemma":0.11786376,"threshold_uncertainty_score":0.98892164},"labels":[],"label_agreement":null},{"id":"W4413135832","doi":"10.1061/9780784486368.001","title":"A Twist on Collaborative Delivery—Construction Manager at Risk and Progressive Design","year":2025,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dawson College","funders":"","keywords":"Computer science; Twist; Integrated project delivery; Software engineering; Systems engineering; Engineering; Project management","score_opus":0.039572697080661,"score_gpt":0.3416090840336642,"score_spread":0.30203638695300317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413135832","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017610839,0.0023593132,0.16273622,0.6895323,0.012408579,0.0004509212,0.000056605993,0.0016227714,0.11322251],"genre_scores_gemma":[0.37882036,0.0029344813,0.18581411,0.19432956,0.005373491,0.0010521295,0.00009914142,0.0018828948,0.22969377],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9560342,0.021029444,0.0015761824,0.0056084227,0.010033987,0.0057178037],"domain_scores_gemma":[0.96393657,0.007304541,0.002357016,0.0036657485,0.010466365,0.012269776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.04027007,0.0020522214,0.0005608666,0.0023094302,0.022014774,0.026741283,0.003449225,0.011014148,0.013854284],"category_scores_gemma":[0.021967307,0.0019504906,0.0009782265,0.0011230279,0.029620703,0.022180319,0.019781617,0.029343411,0.004880751],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017005258,0.00046534903,0.0027443408,0.0003216457,0.00004732006,0.0015005457,0.096848466,0.0017360589,0.0033108294,0.45856312,0.31581283,0.11847944],"study_design_scores_gemma":[0.000059313803,0.0004203825,0.0006574766,0.00039469876,0.000019849682,0.0007191437,0.034225393,0.0015757055,0.0008802995,0.05361366,0.90730274,0.00013131386],"about_ca_topic_score_codex":0.010348351,"about_ca_topic_score_gemma":0.016077012,"teacher_disagreement_score":0.04027007,"about_ca_system_score_codex":0.019297203,"about_ca_system_score_gemma":0.034342173,"threshold_uncertainty_score":0.21297103},"labels":[],"label_agreement":null},{"id":"W4413220769","doi":"10.22260/ccc2025/0044","title":"ASSESSMENT OF LOCAL ENVIRONMENTAL IMPACTS IN CONSTRUCTION PROJECTS USING A KPI-BASED APPROACH","year":2025,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Environmental impact assessment; Computer science; Environmental science; Construction engineering; Engineering; Political science","score_opus":0.07361693522548866,"score_gpt":0.3869717471805968,"score_spread":0.3133548119551081,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413220769","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5238958,0.0006214243,0.43498683,0.0005893605,0.000044834087,0.0011957849,0.002916503,0.0011171651,0.034632266],"genre_scores_gemma":[0.89204735,0.00037493173,0.10471355,0.000020533762,0.000008967131,0.00036969868,0.0011459624,0.00004668048,0.0012724922],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9966072,0.0010395093,0.00033611566,0.00031500132,0.0014328705,0.00026934678],"domain_scores_gemma":[0.99602085,0.0014500316,0.0008164678,0.0002641384,0.0012088814,0.00023978073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003773857,0.0014607072,0.0009442875,0.011373971,0.00074104493,0.0049518705,0.001269879,0.00087854284,0.0020220967],"category_scores_gemma":[0.008319861,0.00047153543,0.001160879,0.008288392,0.00086891773,0.003003609,0.0032353173,0.0007450564,0.00035761116],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023847069,0.00055602915,0.1007833,0.0009982045,0.00035766495,0.000657178,0.0021584874,0.698996,0.007653729,0.020309405,0.001602995,0.16568846],"study_design_scores_gemma":[0.000021016624,0.00034003548,0.05594426,0.00022251169,0.00020117195,0.00024879922,0.006330706,0.90795773,0.0050884495,0.017343141,0.006149803,0.00015237043],"about_ca_topic_score_codex":0.010312144,"about_ca_topic_score_gemma":0.014233929,"teacher_disagreement_score":0.011373971,"about_ca_system_score_codex":0.0031684192,"about_ca_system_score_gemma":0.0021209335,"threshold_uncertainty_score":0.022988617},"labels":[],"label_agreement":null},{"id":"W4413722637","doi":"10.20944/preprints202508.1891.v1","title":"Avoiding Highway Construction Cost Overruns and Associated Claims and Disputes Using Insights from International Project Management Experience and Methodological Advances","year":2025,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Construction engineering; Business; Engineering; Risk analysis (engineering)","score_opus":0.40804478513957243,"score_gpt":0.4856337356188283,"score_spread":0.07758895047925585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413722637","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8058976,0.0020632222,0.10342458,0.013001206,0.00014321273,0.00059435534,0.00030769155,0.00010006015,0.07446804],"genre_scores_gemma":[0.9475027,0.0024864487,0.046655945,0.00034136645,0.000053978107,0.0002292756,0.00021026275,0.000040933865,0.0024790284],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.97873884,0.014085412,0.001181959,0.0013924956,0.0036136196,0.0009876741],"domain_scores_gemma":[0.9511069,0.033286557,0.005026132,0.0027252028,0.0069092675,0.00094580394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.031173624,0.00064457237,0.0004387435,0.004480219,0.0019352667,0.0068886364,0.0016052099,0.0009509049,0.0023906515],"category_scores_gemma":[0.056783706,0.00029729476,0.00042716472,0.005136691,0.0041492,0.0066172453,0.0037040103,0.0017188436,0.00025648382],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016605882,0.0012623173,0.11828517,0.0024552145,0.000117130716,0.0006666907,0.25076404,0.009113955,0.001993415,0.12444962,0.008228791,0.4824976],"study_design_scores_gemma":[0.00004847859,0.0007445601,0.15086803,0.004002262,0.00015959908,0.00074589334,0.59285563,0.024811907,0.004925714,0.13489188,0.08572148,0.00022450696],"about_ca_topic_score_codex":0.0046914537,"about_ca_topic_score_gemma":0.009875429,"teacher_disagreement_score":0.031173624,"about_ca_system_score_codex":0.0048113484,"about_ca_system_score_gemma":0.008465356,"threshold_uncertainty_score":0.16486388},"labels":[],"label_agreement":null},{"id":"W4413958431","doi":"10.5267/j.jpm.2025.6.006","title":"Driving construction project success through project manager knowledge","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Project manager; Project sponsorship; Project management; Business; Engineering management; Project management triangle; Knowledge management; Engineering; Process management; Project charter; Construction engineering; Computer science; Systems engineering","score_opus":0.07949613910668557,"score_gpt":0.42586929719771693,"score_spread":0.34637315809103136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958431","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99430287,0.00009034771,0.000667105,0.00014645663,0.0000028416575,0.0000137153775,0.00002049712,0.000005160522,0.004751091],"genre_scores_gemma":[0.9991579,0.000077281926,0.00027559124,0.00001016612,0.0000018379932,0.000007954794,0.000012989702,0.0000015025805,0.00045472884],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99836606,0.0006509716,0.00008567797,0.000103334554,0.0005318576,0.00026204312],"domain_scores_gemma":[0.99158806,0.0041045416,0.0025539033,0.00021919631,0.00069959636,0.00083479175],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017599185,0.00018242453,0.00016815001,0.0006290795,0.00045441187,0.001920896,0.00023606986,0.00028565814,0.0020431818],"category_scores_gemma":[0.00865534,0.00018798964,0.00011861411,0.0004208704,0.00050767674,0.0008682978,0.001099453,0.0005211125,0.00032913827],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063629006,0.00046276322,0.92435515,0.0001342751,0.000045537305,0.00047439127,0.0088652605,0.0011348663,0.0017757257,0.00087848137,0.0007254574,0.061084393],"study_design_scores_gemma":[0.000006950249,0.0001682023,0.9779413,0.0000987864,0.00003049835,0.00030497904,0.013735115,0.003257888,0.000881644,0.00095712364,0.002597272,0.000020264888],"about_ca_topic_score_codex":0.0016622974,"about_ca_topic_score_gemma":0.0025850257,"teacher_disagreement_score":0.0020431818,"about_ca_system_score_codex":0.00045792162,"about_ca_system_score_gemma":0.0013234976,"threshold_uncertainty_score":0.009307444},"labels":[],"label_agreement":null},{"id":"W4413958540","doi":"10.5267/j.jpm.2025.7.001","title":"Project management for sustainability in times of uncertainty: A systematic review of economic policy uncertainty and corporate strategic responses","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Prince Sattam bin Abdulaziz University","keywords":"Sustainability; Business; Corporate sustainability; Environmental resource management; Economics; Environmental economics; Management science","score_opus":0.08338007988789453,"score_gpt":0.41148918281844726,"score_spread":0.32810910293055273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958540","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001009664,0.9971512,0.00041823337,0.0005777227,0.0000882849,0.00009520726,0.00021229406,0.0000054692614,0.00044202185],"genre_scores_gemma":[0.010942727,0.9874464,0.00079419615,0.0004064018,0.00006406503,0.00014362462,0.0001423768,0.000004253517,0.000055874203],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9901571,0.00386618,0.0030695638,0.0006478716,0.0020687373,0.00019058818],"domain_scores_gemma":[0.9325248,0.054452278,0.008510713,0.0006984057,0.0033475105,0.00046623495],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011538838,0.0009092132,0.00289843,0.0095771225,0.00052609557,0.002931241,0.0012573303,0.0016603913,0.0028252136],"category_scores_gemma":[0.052873824,0.0005997922,0.004185031,0.009855308,0.0009523306,0.0033365234,0.0017097822,0.0013863121,0.00021707057],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000095113195,0.00005246512,0.0022657649,0.690259,0.0032451237,0.00018960182,0.0007245032,0.0005605462,0.0002292531,0.002536167,0.004532926,0.29530963],"study_design_scores_gemma":[0.00004373259,0.00020314856,0.006254839,0.88092756,0.00946178,0.0005235412,0.001173071,0.00024804525,0.00025527918,0.0025771922,0.09827317,0.000058617752],"about_ca_topic_score_codex":0.0051928996,"about_ca_topic_score_gemma":0.015961323,"teacher_disagreement_score":0.011538838,"about_ca_system_score_codex":0.002178048,"about_ca_system_score_gemma":0.015910117,"threshold_uncertainty_score":0.06102389},"labels":[],"label_agreement":null},{"id":"W4413958684","doi":"10.5267/j.jpm.2025.8.006","title":"Impact of inclusive leadership on project success through mediating role of project citizenship behavior: Project complexity as a moderator","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Moderation; Organizational citizenship behavior; Citizenship; Psychology; Business; Process management; Political science; Knowledge management; Public relations; Social psychology; Computer science; Organizational commitment; Politics","score_opus":0.2155638787703479,"score_gpt":0.46852040593745564,"score_spread":0.2529565271671077,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958684","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9942169,0.00012009046,0.0009771347,0.0003947439,0.00002253951,0.00006554403,0.000032512344,0.000011060841,0.004159408],"genre_scores_gemma":[0.9988206,0.00007200946,0.0004150521,0.00004786017,0.000008610892,0.00005982036,0.000017322665,0.000003950942,0.00055489445],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9918469,0.0049980013,0.0003420633,0.0005991538,0.0008844796,0.0013293183],"domain_scores_gemma":[0.9649679,0.021051573,0.0051670363,0.0015330118,0.002156889,0.005123578],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0049901404,0.00055748323,0.00053779845,0.0006695549,0.00190261,0.0021171535,0.0005237824,0.00045087634,0.006021418],"category_scores_gemma":[0.019001408,0.00030774044,0.00057750853,0.0005484113,0.0013899826,0.0009986869,0.003967187,0.0013530627,0.00034619254],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005137186,0.0014225646,0.93810785,0.00019161482,0.00026269388,0.00065179425,0.01448637,0.0003505902,0.0018142628,0.0023706278,0.00054773426,0.03928016],"study_design_scores_gemma":[0.0000644857,0.0012709135,0.97456557,0.00022274817,0.00028045848,0.00019367541,0.016249536,0.0016597825,0.001114593,0.0017806179,0.0025639955,0.00003371877],"about_ca_topic_score_codex":0.004433209,"about_ca_topic_score_gemma":0.007894265,"teacher_disagreement_score":0.006021418,"about_ca_system_score_codex":0.0010523018,"about_ca_system_score_gemma":0.005950482,"threshold_uncertainty_score":0.026390731},"labels":[],"label_agreement":null},{"id":"W4414123141","doi":"10.64628/aap.yws3cfnhe","title":"S’indigner des dépassements de coûts des projets publics ? Certainement, mais pas toujours !","year":2025,"lang":"fr","type":"preprint","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Publics; Government (linguistics); Context (archaeology); Work (physics)","score_opus":0.14169259442000354,"score_gpt":0.39431742436438205,"score_spread":0.2526248299443785,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414123141","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051688477,0.014292435,0.055102218,0.7571749,0.008039383,0.00007544134,0.00046760737,0.0008786904,0.11228084],"genre_scores_gemma":[0.7455027,0.012083115,0.040233996,0.038676556,0.006727858,0.00025180733,0.0006246396,0.001400195,0.1544991],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9854071,0.006220698,0.00043288042,0.0016825912,0.0046241023,0.0016326315],"domain_scores_gemma":[0.97160304,0.010292909,0.0030386925,0.003697644,0.008883896,0.0024837488],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014416796,0.0013712439,0.0011647287,0.002266372,0.004159873,0.013784172,0.0015099886,0.007932757,0.028956119],"category_scores_gemma":[0.08390853,0.00057780364,0.0008011623,0.0029619895,0.009315358,0.023510793,0.0037357186,0.009398484,0.007233918],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033635527,0.00025298115,0.019028313,0.00067313155,0.00018989455,0.0005405482,0.01062157,0.0019402326,0.002269395,0.53080666,0.20291187,0.230429],"study_design_scores_gemma":[0.000083769424,0.00017855426,0.01418419,0.0013824914,0.00009235928,0.0010643909,0.023860207,0.0045008264,0.002564248,0.3101209,0.64175296,0.00021519297],"about_ca_topic_score_codex":0.022655133,"about_ca_topic_score_gemma":0.01941696,"teacher_disagreement_score":0.028956119,"about_ca_system_score_codex":0.00470911,"about_ca_system_score_gemma":0.0055240993,"threshold_uncertainty_score":0.09686786},"labels":[],"label_agreement":null},{"id":"W4414343428","doi":"10.4018/979-8-3373-2555-2.ch002","title":"In-House Engineering as a Catalyst for Sustainable Innovation in Construction","year":2025,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Outsourcing; Sustainability; Corporate governance; Competitive advantage; Engineering economics; Absorptive capacity","score_opus":0.03401387861244877,"score_gpt":0.31692149428872934,"score_spread":0.2829076156762806,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414343428","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05899152,0.01670091,0.031147603,0.006028475,0.00038075447,0.00010471378,0.00006376556,0.000081891594,0.88650036],"genre_scores_gemma":[0.55696267,0.03027473,0.018113185,0.00090648315,0.000281776,0.000075912874,0.00010959606,0.00007319186,0.39320242],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9996679,0.00009995886,0.0000076184233,0.000038387876,0.00014174808,0.00004440358],"domain_scores_gemma":[0.99976677,0.00014750895,0.000020891594,0.000018204462,0.000025773403,0.000020882111],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037360148,0.00028169653,0.00018249167,0.00051662844,0.0007259882,0.0040434217,0.00049565616,0.0011148949,0.0065093404],"category_scores_gemma":[0.00046447507,0.00014206672,0.00025552214,0.0009931958,0.0018437455,0.0020446242,0.00091589824,0.00086632185,0.0010084694],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010503618,0.0000656453,0.0010526873,0.00018925645,0.0000069437724,0.00017224158,0.0013466375,0.004024383,0.0016506193,0.89373285,0.0108440025,0.08690415],"study_design_scores_gemma":[0.000007345582,0.000089383204,0.0046022227,0.00041218408,0.000019863226,0.0005352732,0.0040685222,0.010553842,0.0053574434,0.4051291,0.56919235,0.000032438897],"about_ca_topic_score_codex":0.0018715577,"about_ca_topic_score_gemma":0.00646749,"teacher_disagreement_score":0.0065093404,"about_ca_system_score_codex":0.0017560432,"about_ca_system_score_gemma":0.0016534383,"threshold_uncertainty_score":0.021775901},"labels":[],"label_agreement":null},{"id":"W4414351927","doi":"10.1061/jladah.ladr-1319","title":"Analysis of Three-Party Contracts and Their Impact on Project Costs and Timelines: A Case Study of Construction Delays","year":2025,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Construction contract; Contract management; Project management; Construction industry; Construction management","score_opus":0.019939074505082244,"score_gpt":0.3093890547857437,"score_spread":0.28944998028066143,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414351927","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9922937,0.000056436016,0.0033256074,0.0002016908,0.0000037871594,0.00016293838,0.000063296844,0.0000086275895,0.0038838063],"genre_scores_gemma":[0.99401855,0.00011518241,0.004571641,0.000022231832,0.0000034368657,0.00015480137,0.00003941376,0.000010088109,0.001064693],"study_design_codex":"observational","study_design_gemma":"case_report","domain_scores_codex":[0.9876089,0.0076754573,0.00056697184,0.00043360627,0.0026007097,0.0011143059],"domain_scores_gemma":[0.88974476,0.0934334,0.0072971643,0.0020166496,0.00607733,0.0014306837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010889829,0.0004293953,0.00041077667,0.0020297968,0.0039164675,0.0025153642,0.001494683,0.0015065215,0.0020911111],"category_scores_gemma":[0.03339094,0.00044904914,0.00046814597,0.0034173003,0.0019173988,0.0021604337,0.00190885,0.0018296378,0.0001822663],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0025996107,0.007718174,0.38028672,0.0018652725,0.0002686051,0.022432292,0.13810907,0.09658559,0.012066133,0.079747915,0.004040278,0.25428036],"study_design_scores_gemma":[0.0004511019,0.0051418156,0.2903125,0.00071982347,0.00040888958,0.0063005993,0.4022325,0.21904178,0.02008565,0.015749238,0.039072767,0.0004833519],"about_ca_topic_score_codex":0.01904817,"about_ca_topic_score_gemma":0.025901284,"teacher_disagreement_score":0.01904817,"about_ca_system_score_codex":0.0069539333,"about_ca_system_score_gemma":0.006402717,"threshold_uncertainty_score":0.057591617},"labels":[],"label_agreement":null},{"id":"W4414888396","doi":"10.51244/ijrsi.2025.120800297","title":"The Role of Construction Management in Conflict Resolution in National Government-Funded Construction Projects in Uasin Gishu Kenya .","year":2025,"lang":"en","type":"article","venue":"International journal of research and scientific innovation","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Prevention of Organ Failure","funders":"","keywords":"Government (linguistics); Stakeholder; Descriptive statistics; Stakeholder analysis; Population; Conflict management; Construction management; Project management; Conflict resolution","score_opus":0.10720580904081597,"score_gpt":0.43484056431749574,"score_spread":0.32763475527667973,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414888396","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9874769,0.0008677253,0.00069548166,0.0018921457,0.000022695356,0.00011451434,0.000025118976,0.0000043393857,0.008901083],"genre_scores_gemma":[0.9980484,0.0003274394,0.0005583382,0.00008038241,0.0000033830574,0.00004223065,0.000009790519,0.0000020951522,0.00092796877],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9910487,0.0056811054,0.00037609844,0.0003484527,0.00090023084,0.0016453919],"domain_scores_gemma":[0.99267185,0.0027659058,0.0025814539,0.00014058409,0.0005803811,0.0012598025],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0061023347,0.00032276096,0.0002571719,0.001235342,0.010123395,0.0033095963,0.0010845715,0.001485501,0.002400553],"category_scores_gemma":[0.011756666,0.00056213286,0.00018764366,0.0016244845,0.0042110765,0.002128747,0.004193479,0.0012920204,0.00018617464],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022022144,0.0004464793,0.19376113,0.0007824135,0.000057187073,0.008410121,0.6903107,0.00089538813,0.0026264028,0.014770221,0.003697663,0.08402205],"study_design_scores_gemma":[0.000012142426,0.00018705433,0.15587242,0.0006160326,0.000024682873,0.0013502069,0.80581313,0.0010067236,0.00043488888,0.002125053,0.032507874,0.000049747825],"about_ca_topic_score_codex":0.016336635,"about_ca_topic_score_gemma":0.053747226,"teacher_disagreement_score":0.016336635,"about_ca_system_score_codex":0.0069204206,"about_ca_system_score_gemma":0.010927567,"threshold_uncertainty_score":0.05021143},"labels":[],"label_agreement":null},{"id":"W4415658388","doi":"10.15396/eres2025_232","title":"Econometric Modeling of Construction Cost Estimation: A VECM-Based Approach for Forecasting Price Fluctuations in Türkiye","year":2025,"lang":"","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Inflation (cosmology); Volatility (finance); Econometric model; Price index; Index (typography); Economic forecasting; Margin (machine learning); Quarter (Canadian coin)","score_opus":0.13998528525402082,"score_gpt":0.3583091747972203,"score_spread":0.21832388954319948,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415658388","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80789214,0.0009284411,0.1861094,0.0008509188,0.00007174276,0.000056939847,0.0010309202,0.00015947109,0.0029000328],"genre_scores_gemma":[0.98820776,0.00037890067,0.009709469,0.000026756301,0.000022957183,0.000047250902,0.0006290749,0.000017190692,0.0009605937],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994771,0.0002930108,0.000030414083,0.000082187595,0.00004630545,0.00007105341],"domain_scores_gemma":[0.9978666,0.0016989227,0.00020228206,0.00004787413,0.00015598802,0.000028545106],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010601373,0.0005451059,0.0005928348,0.0008657496,0.0002698607,0.0011587313,0.00068040134,0.000790245,0.0011855655],"category_scores_gemma":[0.0043347627,0.00038743418,0.000616829,0.0012906011,0.00030829103,0.0007130608,0.00044200904,0.0009685696,0.0001521811],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021594555,0.000020972439,0.008552024,0.000021517011,0.000044354303,0.000077014825,0.00003482166,0.9804388,0.00014155147,0.0026146187,0.0003405069,0.007692198],"study_design_scores_gemma":[0.0000011323148,0.000004338922,0.0012149784,0.0000026519451,0.00000382819,0.000003683041,0.00001769447,0.998095,0.00002806554,0.0005415842,0.00008359229,0.0000035174303],"about_ca_topic_score_codex":0.04568408,"about_ca_topic_score_gemma":0.02256102,"teacher_disagreement_score":0.04568408,"about_ca_system_score_codex":0.0009716293,"about_ca_system_score_gemma":0.0009185125,"threshold_uncertainty_score":0.090836346},"labels":[],"label_agreement":null},{"id":"W4415764133","doi":"10.29173/mocs314","title":"Navigating Barriers to the Adoption and Scalability of Modular Construction in Ethiopia","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Interdependence; Scalability; Supply chain; Process (computing); Key (lock); Resilience (materials science); Fuzzy logic","score_opus":0.016645267708234116,"score_gpt":0.3017042716191671,"score_spread":0.285059003910933,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764133","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98865926,0.00025736546,0.002056521,0.00078859803,0.0000101895885,0.00006447853,0.000044327364,0.000007327927,0.008111993],"genre_scores_gemma":[0.998211,0.00020459817,0.00107508,0.00004793361,0.0000019539789,0.000018729692,0.000013272706,0.0000024783096,0.00042505484],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99708384,0.0012440502,0.00016487646,0.00016776189,0.0006676981,0.0006718198],"domain_scores_gemma":[0.994822,0.0026891318,0.0010247807,0.00021162919,0.0007901258,0.00046229266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052364315,0.0002753269,0.00020137285,0.0010759901,0.0013537278,0.0026070226,0.00074664276,0.0005120341,0.002230111],"category_scores_gemma":[0.0070299464,0.00027313095,0.00017020754,0.0010622501,0.0014111786,0.0015644946,0.0020565896,0.0006284575,0.00012062779],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005583686,0.000988165,0.4546123,0.0023159478,0.00014720617,0.006691397,0.09790796,0.015364717,0.015554782,0.10834839,0.004669876,0.29284084],"study_design_scores_gemma":[0.00005213813,0.0009311022,0.44987956,0.002907553,0.00014819873,0.0018816846,0.39682114,0.0182388,0.00812302,0.029337514,0.09149394,0.00018539354],"about_ca_topic_score_codex":0.008264396,"about_ca_topic_score_gemma":0.014392126,"teacher_disagreement_score":0.008264396,"about_ca_system_score_codex":0.003682973,"about_ca_system_score_gemma":0.0065544187,"threshold_uncertainty_score":0.027693212},"labels":[],"label_agreement":null},{"id":"W4415777502","doi":"10.56889/lxio5917","title":"Navigating PM Transitions: Challenges for PMOs in Adapting to Changes in Organizations’ Project Management Approaches","year":2025,"lang":"","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"PMOS logic; Key (lock); Institution; Project management; Incentive","score_opus":0.18386956253535092,"score_gpt":0.39074822898174577,"score_spread":0.20687866644639485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415777502","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94462657,0.000227929,0.0232576,0.0067491513,0.00005027199,0.0001990337,0.00003712817,0.00007066199,0.02478167],"genre_scores_gemma":[0.9975624,0.00006406201,0.0017622736,0.00013184572,0.000007423019,0.00005776895,0.000010178501,0.000011708257,0.0003922875],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.96346265,0.023829859,0.0014351845,0.00212676,0.0038948979,0.0052506486],"domain_scores_gemma":[0.94659656,0.033554837,0.008209092,0.003131444,0.003694132,0.004813886],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02468815,0.00031943526,0.0004314606,0.0013860184,0.008279507,0.010108788,0.0015939281,0.0020193981,0.0022071786],"category_scores_gemma":[0.063993916,0.0005829867,0.0003266615,0.001352222,0.008992399,0.0069462913,0.00958576,0.0030027824,0.00037735092],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030361,0.00035880893,0.13312188,0.00056600856,0.000069928494,0.0015206487,0.6772877,0.0024495646,0.004921818,0.05172973,0.0025205272,0.12514976],"study_design_scores_gemma":[0.000038372327,0.00025294334,0.08833524,0.00038490692,0.000021645368,0.00043150925,0.8509646,0.0023587202,0.0010807929,0.028835552,0.027223403,0.00007233539],"about_ca_topic_score_codex":0.0077011036,"about_ca_topic_score_gemma":0.01400707,"teacher_disagreement_score":0.02468815,"about_ca_system_score_codex":0.005788808,"about_ca_system_score_gemma":0.013515088,"threshold_uncertainty_score":0.13056499},"labels":[],"label_agreement":null},{"id":"W4415945054","doi":"10.1007/978-3-032-00182-5_30","title":"Sustainable Foundations: Enhancing Project Viability Through Sustainability Readiness","year":2025,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University Health Centre","funders":"","keywords":"Sustainability; Sustainability organizations; Corporate governance; Social sustainability; Key (lock); Measure (data warehouse); Product-service system","score_opus":0.06967658612317042,"score_gpt":0.38907589909402496,"score_spread":0.31939931297085455,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415945054","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022710129,0.0062653203,0.024238175,0.0039279284,0.00045729143,0.000046277517,0.000048778267,0.00012534327,0.96261996],"genre_scores_gemma":[0.05699084,0.012263659,0.01981972,0.00080855715,0.00019757925,0.00010706984,0.00012022662,0.00018372014,0.9095086],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9996325,0.00010389169,0.000006618552,0.000023274251,0.00020400803,0.000029702065],"domain_scores_gemma":[0.9998091,0.00009065936,0.000010723821,0.000020169275,0.000044850796,0.000024597994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00057894643,0.0003750982,0.0001446017,0.0005651612,0.00070075254,0.004159399,0.0005585915,0.001006068,0.020376803],"category_scores_gemma":[0.0009140722,0.00019053029,0.000114313414,0.0009942799,0.0012345915,0.002567951,0.0014637163,0.0011480565,0.0050879167],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004346704,0.000033035216,0.000115316994,0.00009979473,0.0000021542387,0.00005173245,0.0005811798,0.0009435373,0.00057761115,0.67065257,0.09377577,0.23316301],"study_design_scores_gemma":[0.0000020338152,0.00001563488,0.00037934692,0.00023533842,0.0000026615528,0.00009803584,0.0007199213,0.0010767105,0.00081039354,0.20776756,0.7888845,0.00000790746],"about_ca_topic_score_codex":0.0026896799,"about_ca_topic_score_gemma":0.010938039,"teacher_disagreement_score":0.020376803,"about_ca_system_score_codex":0.0013327491,"about_ca_system_score_gemma":0.0025200357,"threshold_uncertainty_score":0.06816721},"labels":[],"label_agreement":null},{"id":"W4415964285","doi":"10.14359/51748938","title":"ACI Concrete Convention Brings the Concrete Industry Together in Toronto","year":2025,"lang":"","type":"article","venue":"ACI Concrete International","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Convention; Construction industry; Work (physics); Feature (linguistics)","score_opus":0.033271664816940015,"score_gpt":0.36954875060634756,"score_spread":0.33627708578940757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415964285","genre_codex":"other","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.060031503,0.017221775,0.002490411,0.14078595,0.01559573,0.00024878889,0.003143181,0.0006344146,0.7598481],"genre_scores_gemma":[0.21708126,0.0032549351,0.0020779283,0.0020437257,0.0008213249,0.00004317316,0.000963827,0.0001452484,0.7735686],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9974509,0.00015507716,0.000051592775,0.00018800699,0.0014009599,0.0007534699],"domain_scores_gemma":[0.99658316,0.0001586747,0.00013718812,0.000163382,0.0009669993,0.0019905143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015004813,0.0006582111,0.00042919762,0.00079609285,0.008724299,0.009673258,0.00078945776,0.0033220947,0.04977576],"category_scores_gemma":[0.0018269991,0.0004941414,0.00042054095,0.0017088694,0.0029130385,0.0014253571,0.0040776655,0.004201803,0.005706651],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015024241,0.0000769939,0.005601752,0.00016642298,0.000024491877,0.0007000127,0.0018203083,0.0012639976,0.0021941904,0.045147218,0.89344245,0.04941202],"study_design_scores_gemma":[0.000008952047,0.000030464444,0.015044228,0.00003560116,0.000005752831,0.000031016487,0.0016076355,0.00015976238,0.00034778935,0.00066796504,0.98204184,0.000019131605],"about_ca_topic_score_codex":0.7624481,"about_ca_topic_score_gemma":0.9418333,"teacher_disagreement_score":0.7624481,"about_ca_system_score_codex":0.02501625,"about_ca_system_score_gemma":0.05420523,"threshold_uncertainty_score":0.47790182},"labels":[],"label_agreement":null},{"id":"W4415989612","doi":"10.2139/ssrn.5585951","title":"The Impact of Leadership Styles on Project Efficiency","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Brandon University","funders":"","keywords":"Leadership style; Transformational leadership; Project stakeholder; Empirical research; Project management; Shared leadership; Constructive; Employee empowerment","score_opus":0.1261547342442631,"score_gpt":0.4149079270102217,"score_spread":0.2887531927659586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415989612","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99456406,0.00005971701,0.00034687843,0.00008746763,0.000009331108,0.00000765026,0.000035735153,0.0000050449917,0.004884074],"genre_scores_gemma":[0.9993687,0.00002169834,0.00007061083,0.000011354407,0.000008067791,0.0000033330714,0.000019758523,0.00000447107,0.00049189094],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99605525,0.0021236097,0.00019722681,0.00022668864,0.00069352565,0.00070368027],"domain_scores_gemma":[0.9012734,0.07262594,0.008812202,0.0032900807,0.004086924,0.009911379],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0047647865,0.00026499244,0.00031604466,0.00083835283,0.00045857945,0.002501705,0.00038513046,0.00059940614,0.009264485],"category_scores_gemma":[0.03875496,0.00014176224,0.00041427265,0.0008880308,0.0008086602,0.00080754556,0.00095507066,0.0008873825,0.0009308011],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.005280689,0.0024119136,0.8932602,0.00013322082,0.00039692703,0.000417478,0.0010752333,0.009339509,0.007569433,0.002211505,0.0009170985,0.076986864],"study_design_scores_gemma":[0.00009069822,0.0015053028,0.99046713,0.000019962039,0.00007223751,0.000071690876,0.0010712896,0.0035200585,0.0009938217,0.0018304577,0.00034125106,0.000016125303],"about_ca_topic_score_codex":0.0007226473,"about_ca_topic_score_gemma":0.0014192234,"teacher_disagreement_score":0.009264485,"about_ca_system_score_codex":0.0005608358,"about_ca_system_score_gemma":0.00074712856,"threshold_uncertainty_score":0.030992866},"labels":[],"label_agreement":null},{"id":"W4415999168","doi":"10.1080/15623599.2025.2559091","title":"Deep learning-based forecasting for construction project duration at completion","year":2025,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Duration (music); Completion (oil and gas wells); Production (economics); Set (abstract data type); Data collection","score_opus":0.07570614679150699,"score_gpt":0.376289260794616,"score_spread":0.300583114003109,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415999168","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39837444,0.00094024435,0.58268553,0.00078110985,0.000169502,0.00006314678,0.005681807,0.0037684538,0.007535787],"genre_scores_gemma":[0.96180165,0.00026056706,0.03322044,0.000037805716,0.000023484674,0.000053724714,0.0027689661,0.00006443118,0.0017688988],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997845,0.000034108594,0.00001590423,0.000067855224,0.00005948321,0.00003820207],"domain_scores_gemma":[0.9993069,0.00027511764,0.00010659439,0.000050494873,0.00021114528,0.000049803846],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068615837,0.0006870849,0.00033508168,0.0009749067,0.00016337073,0.0005318895,0.00063264376,0.00039052364,0.0017627598],"category_scores_gemma":[0.002627557,0.00030240373,0.000422527,0.0009852923,0.00015309703,0.0006640004,0.00047575907,0.0009622896,0.00049648696],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000073332456,0.00004850605,0.009527796,0.00004987908,0.000027494272,0.000032379303,0.000036771864,0.918802,0.000804402,0.0012029884,0.0023392562,0.06705519],"study_design_scores_gemma":[0.0000013182669,0.000007190409,0.0010520304,0.0000042647657,0.0000030144508,0.0000026386153,0.000004815783,0.99777526,0.0003189803,0.0005472633,0.00028034337,0.000002815982],"about_ca_topic_score_codex":0.026980814,"about_ca_topic_score_gemma":0.031987693,"teacher_disagreement_score":0.026980814,"about_ca_system_score_codex":0.00094151334,"about_ca_system_score_gemma":0.00090001646,"threshold_uncertainty_score":0.05364752},"labels":[],"label_agreement":null},{"id":"W4416005805","doi":"10.5465/amproc.2025.17759abstract","title":"Grassroots Communities Resistance Against Megaprojects: A Perceptual Legitimacy Lens","year":2025,"lang":"en","type":"article","venue":"Academy of Management Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Grassroots; Legitimacy; Interpretation (philosophy); Perception; Face (sociological concept); Restructuring; Scholarship; Social movement","score_opus":0.08896769566630344,"score_gpt":0.36722968788603805,"score_spread":0.2782619922197346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416005805","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4164407,0.0007441732,0.051789515,0.023729127,0.00022505499,0.00016036062,0.000063746855,0.00008577152,0.50676155],"genre_scores_gemma":[0.99655724,0.00008193421,0.0016093451,0.00014526851,0.0000362276,0.000023486951,0.0000082547185,0.0000141969485,0.0015240388],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9934017,0.003722871,0.00016376923,0.0007447393,0.0012991674,0.0006677147],"domain_scores_gemma":[0.991793,0.004461695,0.0011981167,0.00062088633,0.00093707244,0.000989205],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0068224687,0.0005382705,0.00037730002,0.00386988,0.0060855174,0.0147486245,0.0013694181,0.0025620307,0.0053739976],"category_scores_gemma":[0.01196489,0.00032294256,0.00035314422,0.0014474059,0.037722517,0.010503013,0.006699708,0.0027192559,0.0003200129],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004086588,0.000090748654,0.0063349395,0.00008265234,0.000012060662,0.0004466416,0.17361163,0.00034551774,0.0011317687,0.80240697,0.0009099916,0.014586252],"study_design_scores_gemma":[0.00005335176,0.00016803438,0.023478914,0.00040871883,0.000047069567,0.00072219875,0.35008514,0.0043237787,0.0012466464,0.52508205,0.09429814,0.0000860414],"about_ca_topic_score_codex":0.0052942005,"about_ca_topic_score_gemma":0.0054602614,"teacher_disagreement_score":0.0147486245,"about_ca_system_score_codex":0.0051701046,"about_ca_system_score_gemma":0.0032463323,"threshold_uncertainty_score":0.037511945},"labels":[],"label_agreement":null},{"id":"W4416051775","doi":"10.1016/j.ijproman.2025.102788","title":"What Do We Really Know? A 40-Year Scientific Realist Examination of Theory Testing in Project Management","year":2025,"lang":"en","type":"article","venue":"International Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University; University of Windsor","funders":"","keywords":"Scrutiny; Scholarship; Legitimacy; Empirical research; Project management; Conceptual framework; Development theory; Scientific theory","score_opus":0.07398197123150943,"score_gpt":0.3894116356311072,"score_spread":0.31542966439959774,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416051775","genre_codex":"empirical","genre_gemma":"review","domain_codex":null,"domain_gemma":"methods","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":"methods","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8935249,0.024941128,0.0062053055,0.039611015,0.00036720274,0.0001766736,0.00020219076,0.000032935797,0.034938768],"genre_scores_gemma":[0.99101794,0.004543465,0.0024474752,0.0008936018,0.00018946193,0.00009025944,0.0000684111,0.0000109229595,0.0007384606],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.97165966,0.016831214,0.0020524813,0.0013287769,0.007052617,0.0010752096],"domain_scores_gemma":[0.5536759,0.39377156,0.019425813,0.008199194,0.022401085,0.0025265028],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.1117735,0.0002772057,0.0005369523,0.012969545,0.0042898394,0.009199803,0.0015441902,0.0017995088,0.0020467173],"category_scores_gemma":[0.15664431,0.00045052552,0.0005122813,0.014115352,0.012451982,0.009734895,0.005237314,0.0025525338,0.00023656599],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004268786,0.0007740365,0.121247716,0.0022614568,0.00019230496,0.0020920322,0.2322624,0.001469301,0.0018755522,0.13430175,0.0069223517,0.49617422],"study_design_scores_gemma":[0.00013298003,0.0011989834,0.3344258,0.007832802,0.00026803667,0.001465903,0.28655002,0.007871249,0.00793344,0.17718345,0.17492086,0.0002164372],"about_ca_topic_score_codex":0.0025740354,"about_ca_topic_score_gemma":0.004294869,"teacher_disagreement_score":0.8882265,"about_ca_system_score_codex":0.007732416,"about_ca_system_score_gemma":0.009439763,"threshold_uncertainty_score":0.5911218},"labels":[],"label_agreement":null},{"id":"W4416169973","doi":"10.1080/09537287.2025.2583298","title":"Advancing the Fifth Hand explanation of project cost misperformance","year":2025,"lang":"en","type":"article","venue":"Production Planning & Control","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"Australian Research Council; Curtin University, Malaysia","keywords":"Cost engineering; Cost estimate; Cost contingency; Cost control; Project management","score_opus":0.05224569422112784,"score_gpt":0.3832690262836296,"score_spread":0.33102333206250173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416169973","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3949873,0.0057855886,0.43361208,0.08733749,0.0004787092,0.00029002567,0.00040372455,0.0002378419,0.07686726],"genre_scores_gemma":[0.9805695,0.0005039734,0.01773101,0.0003853294,0.00007207284,0.00005461116,0.00006146542,0.000016542785,0.0006053742],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9828808,0.008009891,0.0016542921,0.0021842383,0.004319236,0.0009515873],"domain_scores_gemma":[0.85045946,0.116873965,0.016678357,0.009035083,0.0058042654,0.0011488477],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.025250023,0.0010304531,0.0011487007,0.0085619325,0.0023673736,0.009801877,0.0033946356,0.0049471078,0.0053814813],"category_scores_gemma":[0.08966301,0.0009587324,0.0017223007,0.004466853,0.020892257,0.017146846,0.009797661,0.0042635496,0.00025354454],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059296133,0.00007550562,0.017301947,0.0003103543,0.000078629186,0.0007752013,0.010007909,0.0074221822,0.0002670173,0.9391005,0.00052207307,0.024079418],"study_design_scores_gemma":[0.000033875825,0.000036244674,0.0066998545,0.00032598124,0.00006313525,0.00027287917,0.0047535864,0.017249275,0.00036749511,0.9640999,0.006054728,0.00004315546],"about_ca_topic_score_codex":0.0037366517,"about_ca_topic_score_gemma":0.0023491168,"teacher_disagreement_score":0.025250023,"about_ca_system_score_codex":0.0050396654,"about_ca_system_score_gemma":0.0051958687,"threshold_uncertainty_score":0.13353646},"labels":[],"label_agreement":null},{"id":"W4416276679","doi":"10.1007/978-3-031-97697-1_10","title":"Coquihalla Highway Reinstatement from 2021 Atmospheric River Event Using the Alliance Project Delivery Model","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Alliance; Bridge (graph theory); Flexibility (engineering); General partnership; Work (physics); Project management; Integrated project delivery; Event (particle physics)","score_opus":0.04648620483211413,"score_gpt":0.29966445921534857,"score_spread":0.25317825438323444,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416276679","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77673334,0.00066311983,0.072511375,0.0042860014,0.00037462648,0.00025643944,0.022895228,0.0011247378,0.12115526],"genre_scores_gemma":[0.9555205,0.00023464464,0.011830312,0.000097699856,0.000023560018,0.00011654566,0.006226382,0.00019216341,0.025758235],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997137,0.0000991026,0.0000143125,0.000062100204,0.0000547165,0.000056017485],"domain_scores_gemma":[0.9990382,0.0004800342,0.000100092526,0.00005818596,0.00024379368,0.00007976473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013257868,0.0004320374,0.0004302262,0.0008659607,0.00043370033,0.0015576057,0.00094258774,0.0009570745,0.008857262],"category_scores_gemma":[0.0028881938,0.00042931078,0.00082913914,0.000988039,0.00019893506,0.001388465,0.00064397766,0.0010005225,0.00076362654],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059634207,0.00004326651,0.007822477,0.000026439386,0.000038518894,0.00006233248,0.000038360235,0.9613609,0.00006366312,0.0129316,0.0072222073,0.0103306305],"study_design_scores_gemma":[0.000013503883,0.000020341407,0.003361993,0.0000171323,0.000024614888,0.000013389419,0.000115147006,0.9866571,0.000085973574,0.0069633955,0.0027112553,0.00001610696],"about_ca_topic_score_codex":0.23398405,"about_ca_topic_score_gemma":0.2853706,"teacher_disagreement_score":0.76601595,"about_ca_system_score_codex":0.0037328,"about_ca_system_score_gemma":0.0027792684,"threshold_uncertainty_score":0.46524423},"labels":[],"label_agreement":null},{"id":"W4416286525","doi":"10.1109/tem.2025.3632770","title":"Beyond Bias and Error: Institutionalizing the Fifth Hand to Explain Infrastructure Project Cost Misperformance","year":2025,"lang":"","type":"article","venue":"IEEE Transactions on Engineering Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Institutional theory; Normative; Legitimacy; Rationality; Organizational theory; Transaction cost; Institutional economics; Organizational ecology; Foundation (evidence)","score_opus":0.04085562706077248,"score_gpt":0.309615019238087,"score_spread":0.2687593921773145,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416286525","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7259394,0.00070603867,0.19423272,0.011286637,0.00008970661,0.00021411023,0.00014746726,0.00023513255,0.06714875],"genre_scores_gemma":[0.992804,0.000087005545,0.006406057,0.00010048487,0.000018661704,0.00004461703,0.000019076908,0.000019909925,0.00050016644],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9912956,0.0033748895,0.000731802,0.0010457747,0.0022700252,0.001281781],"domain_scores_gemma":[0.9358034,0.029755158,0.019577172,0.009551657,0.003487491,0.0018251629],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011036593,0.0006571017,0.00060771784,0.0039111027,0.0018336986,0.0075585716,0.0019357778,0.0022718247,0.003980052],"category_scores_gemma":[0.051123112,0.0004483451,0.0008649844,0.0030664855,0.018253272,0.009796644,0.007338948,0.0022005506,0.00030889417],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014314732,0.00030124816,0.21117002,0.00018144818,0.00017534276,0.00064806646,0.010245343,0.032949932,0.0012005494,0.6945569,0.00070746586,0.047720566],"study_design_scores_gemma":[0.00005818487,0.00017567811,0.08008783,0.0002412839,0.000115088864,0.00030779734,0.009785866,0.060519617,0.0015769242,0.83855766,0.008430576,0.00014353561],"about_ca_topic_score_codex":0.006138816,"about_ca_topic_score_gemma":0.0045367214,"teacher_disagreement_score":0.011036593,"about_ca_system_score_codex":0.004938855,"about_ca_system_score_gemma":0.00553841,"threshold_uncertainty_score":0.05836779},"labels":[],"label_agreement":null},{"id":"W4416527749","doi":"10.1017/9781009322737.001","title":"Introduction","year":2025,"lang":"","type":"book-chapter","venue":"Cambridge University Press eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Context (archaeology); Project management; Phenomenon; Set (abstract data type); Project charter; Project planning","score_opus":0.040412625213846365,"score_gpt":0.25320970883736404,"score_spread":0.21279708362351768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416527749","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00094401353,0.006601404,0.0037441682,0.005601379,0.0044600484,0.00016522281,0.0021572968,0.0008597309,0.9754667],"genre_scores_gemma":[0.004721466,0.0044524623,0.002230541,0.0021799034,0.0008435095,0.000116608186,0.00198345,0.00034813274,0.983124],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987464,0.0001501588,0.00006818891,0.00031213634,0.00059176434,0.00013133079],"domain_scores_gemma":[0.99871385,0.00022159058,0.00006411235,0.000176462,0.00057984603,0.00024416563],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0007939996,0.0008960394,0.0007640943,0.0016015649,0.0021816501,0.0061717755,0.0018796409,0.002772758,0.5055798],"category_scores_gemma":[0.0034529772,0.00039507903,0.000594661,0.0018510363,0.0010390244,0.004529971,0.0034529048,0.002531039,0.32620648],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003674697,0.00005649189,0.00028866596,0.0003451836,0.0000043659934,0.00014326666,0.0006616612,0.00015659093,0.0004791111,0.053976543,0.7613976,0.18245383],"study_design_scores_gemma":[0.000001565994,0.000008721063,0.00012743942,0.00009793686,8.565911e-7,0.00008349508,0.000096453165,0.00001852164,0.000049090027,0.0027544997,0.9967584,0.0000029396797],"about_ca_topic_score_codex":0.0030264894,"about_ca_topic_score_gemma":0.004031733,"teacher_disagreement_score":0.49442017,"about_ca_system_score_codex":0.0023074239,"about_ca_system_score_gemma":0.0026596058,"threshold_uncertainty_score":0.70523036},"labels":[],"label_agreement":null},{"id":"W4416775264","doi":"10.1142/14655","title":"Developing a Body of Knowledge in Behavioural Project Management","year":2025,"lang":"en","type":"book","venue":"WORLD SCIENTIFIC eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Project management; Action (physics); Project management triangle; Project planning; Program management","score_opus":0.15251225076859823,"score_gpt":0.38976254073921524,"score_spread":0.237250289970617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416775264","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0047761374,0.044557955,0.27760723,0.022014761,0.0018392898,0.00018108812,0.00021540461,0.00037185298,0.64843637],"genre_scores_gemma":[0.0796657,0.09422464,0.3775996,0.00687584,0.0021295159,0.00072453264,0.0010265755,0.00052860053,0.43722492],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9987423,0.000433804,0.00010957451,0.00011228409,0.0005440659,0.000057979978],"domain_scores_gemma":[0.9931029,0.0053060297,0.00013322379,0.0005409221,0.00073540927,0.00018153648],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004049852,0.0004440211,0.00048527028,0.0029734601,0.0011791813,0.004654798,0.0012946738,0.0019687833,0.010219265],"category_scores_gemma":[0.0054198545,0.0003601556,0.00043395485,0.003300102,0.004689025,0.0068969727,0.002062728,0.0029549033,0.004075416],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006790918,0.000085905565,0.00025868948,0.0005394463,0.000008252965,0.0000760094,0.0023703643,0.0016250835,0.0005683405,0.47653604,0.054082066,0.46384302],"study_design_scores_gemma":[0.000004375606,0.000018695218,0.00058221945,0.0013559767,0.000006020499,0.00012378293,0.00071691704,0.0019113639,0.0007901173,0.26754677,0.7269299,0.000013902068],"about_ca_topic_score_codex":0.0030421328,"about_ca_topic_score_gemma":0.004771206,"teacher_disagreement_score":0.010219265,"about_ca_system_score_codex":0.0017655209,"about_ca_system_score_gemma":0.0035609573,"threshold_uncertainty_score":0.0341869},"labels":[],"label_agreement":null},{"id":"W4416939647","doi":"10.61503/cissmp.4.2.2025.343","title":"The Role of Knowledge Sharing in Linking Leadership, Team Collaboration, and Environmental Sustainability Practices to Project Success in the Construction Industry","year":2025,"lang":"en","type":"article","venue":"Contemporary Issues in Social Sciences and Management Practices","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Sustainability; Knowledge sharing; Mediation; Structural equation modeling; Construction industry; Project team; Project management","score_opus":0.1407347821270298,"score_gpt":0.4547371702036381,"score_spread":0.3140023880766083,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416939647","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9888398,0.00029949608,0.001573128,0.00047534925,0.0000063521397,0.00003114324,0.000009654427,0.000008233131,0.008756912],"genre_scores_gemma":[0.99941945,0.00009737228,0.0003161877,0.000015200098,0.0000039333795,0.000010474937,0.0000044914523,0.0000014530665,0.00013142732],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9890975,0.0070361905,0.0003960753,0.0005312684,0.0017182296,0.0012208312],"domain_scores_gemma":[0.93435436,0.044834398,0.0114188995,0.0018595651,0.0025735414,0.00495929],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00981565,0.0004174646,0.00036235148,0.0021066975,0.0016829682,0.0035694914,0.00064167444,0.00073286885,0.0016943234],"category_scores_gemma":[0.040748637,0.0002796537,0.00042897247,0.0013825188,0.002556672,0.002636685,0.005382387,0.0009487912,0.00012821745],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024956695,0.0016236278,0.83539563,0.00034255785,0.0003940377,0.00052359514,0.02682018,0.0031460323,0.001369189,0.0067272102,0.00046667125,0.12294172],"study_design_scores_gemma":[0.000040855615,0.0010514909,0.93037665,0.0003755748,0.0002780745,0.00039776834,0.044262752,0.0059839743,0.0012313097,0.013308929,0.0026198076,0.000072768446],"about_ca_topic_score_codex":0.003210599,"about_ca_topic_score_gemma":0.0041884403,"teacher_disagreement_score":0.00981565,"about_ca_system_score_codex":0.0015197789,"about_ca_system_score_gemma":0.0047643776,"threshold_uncertainty_score":0.051910758},"labels":[],"label_agreement":null},{"id":"W4416940983","doi":"10.61503/cissmp.4.1.2025.344","title":"Organizational Agility as a Mediator between Project Management, Innovation, and Environmental Sustainability Practices on Project Success in the Construction Industry","year":2025,"lang":"en","type":"article","venue":"Contemporary Issues in Social Sciences and Management Practices","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Sustainability; Mediation; Project management; Structural equation modeling; OPM3; Construction industry; Project stakeholder; Project management triangle; Construction management","score_opus":0.1337270247224331,"score_gpt":0.46519222118222714,"score_spread":0.331465196459794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416940983","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9980241,0.00007249701,0.00024778408,0.00012406982,0.0000024473434,0.000008369781,0.000006208936,0.000002891361,0.0015115634],"genre_scores_gemma":[0.9996278,0.000041841435,0.00014430801,0.00001257209,0.0000023451685,0.000011586735,0.000007774042,0.0000013232045,0.00015042999],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9948053,0.0036183666,0.00014727947,0.00026953217,0.00053632987,0.0006231001],"domain_scores_gemma":[0.9680779,0.020919804,0.004918321,0.0008703527,0.0012362711,0.0039772973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0043619266,0.00037787214,0.00031831925,0.0013051678,0.00093153387,0.0020229877,0.0004955572,0.00063130417,0.0027229479],"category_scores_gemma":[0.013556289,0.00023218952,0.0004912658,0.0007345732,0.0015480422,0.0010231672,0.0041567767,0.0010965718,0.00021508739],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031340163,0.0010389532,0.9608258,0.000071058355,0.0002175842,0.00038543946,0.009709549,0.0009465968,0.0011195581,0.0026091698,0.00019281781,0.022570206],"study_design_scores_gemma":[0.000022371383,0.0006227553,0.9786622,0.00012626621,0.00015295984,0.00009632926,0.014977563,0.0021930023,0.0005732208,0.0017951706,0.0007575225,0.000020720398],"about_ca_topic_score_codex":0.0029095213,"about_ca_topic_score_gemma":0.0036096347,"teacher_disagreement_score":0.0043619266,"about_ca_system_score_codex":0.0009308627,"about_ca_system_score_gemma":0.0026271958,"threshold_uncertainty_score":0.023068368},"labels":[],"label_agreement":null},{"id":"W4417145590","doi":"10.5121/ijist.2025.15601","title":"REVISITING IT PROJECT UNCERTAINTY: OPERATIONALIZING THE SAMBAMURTHY–ZMUD MODEL FOR DE-RISKING DIGITAL TRANSFORMATION PROJECTS","year":2025,"lang":"","type":"article","venue":"International Journal of Information Sciences and Techniques","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Operationalization; Deliverable; Sociotechnical system; CLARITY; Ambiguity; Stakeholder; Project management; Digital transformation; Artifact (error)","score_opus":0.07995584967867796,"score_gpt":0.413902848755393,"score_spread":0.33394699907671505,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417145590","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21171734,0.001520239,0.7138447,0.014617898,0.00013868453,0.00057346356,0.0002525526,0.00019081401,0.05714426],"genre_scores_gemma":[0.96058077,0.0003880939,0.037478626,0.00019952534,0.000026326887,0.00026254437,0.000046636535,0.00002591457,0.0009915278],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98117965,0.009952602,0.0011708079,0.0016967357,0.004761509,0.0012386646],"domain_scores_gemma":[0.94311446,0.0387872,0.008705765,0.003348243,0.0045211907,0.0015231192],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.018445224,0.0012424239,0.0008170023,0.0060346974,0.0029372745,0.012694385,0.0031415888,0.0031221772,0.003318467],"category_scores_gemma":[0.0634262,0.0008021631,0.0012910737,0.0042483555,0.01263002,0.015876831,0.0115365265,0.004139966,0.00044212345],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018670417,0.0001715766,0.026713474,0.0004534924,0.00013385982,0.0005679846,0.01908329,0.062468033,0.00066685065,0.8282958,0.0016204943,0.059638433],"study_design_scores_gemma":[0.000047236543,0.00021464094,0.008528721,0.0005443697,0.000105464474,0.0005652027,0.013869552,0.17315039,0.0009990016,0.788386,0.01341392,0.00017558556],"about_ca_topic_score_codex":0.004383631,"about_ca_topic_score_gemma":0.0038944043,"teacher_disagreement_score":0.018445224,"about_ca_system_score_codex":0.0077899806,"about_ca_system_score_gemma":0.006671386,"threshold_uncertainty_score":0.09754884},"labels":[],"label_agreement":null},{"id":"W4417194576","doi":"10.3390/metrics2040025","title":"Literature Review on Decarbonization Through Sustainability-Oriented Contractor Selection in IPD Projects: Bibliometric Analysis","year":2025,"lang":"en","type":"article","venue":"Metrics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Procurement; Sustainability; Stakeholder; Integrated project delivery; Selection (genetic algorithm); Thematic analysis; Citation; Construction industry","score_opus":0.04979204856960495,"score_gpt":0.39845061498334067,"score_spread":0.3486585664137357,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417194576","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026451884,0.94409245,0.002687952,0.006056957,0.0005400891,0.00036478325,0.0038996863,0.00009421154,0.015812078],"genre_scores_gemma":[0.0831596,0.908277,0.003907916,0.0007096657,0.00037288884,0.0003401469,0.0025150706,0.000026330667,0.00069138466],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9854617,0.004100117,0.004260863,0.00095377804,0.0047568106,0.0004666683],"domain_scores_gemma":[0.88832814,0.081126265,0.011112575,0.0017267202,0.016758753,0.0009475408],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.015233241,0.0009911503,0.002099608,0.116836056,0.0015082347,0.005762929,0.0011996405,0.0011718358,0.0054877126],"category_scores_gemma":[0.06988528,0.0005855031,0.001923646,0.16722375,0.0015017835,0.0047395686,0.002322547,0.000744236,0.000738074],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018805587,0.00012563067,0.018804718,0.25478715,0.0015904531,0.0004418119,0.0030123282,0.0012368725,0.0007920065,0.0066569946,0.02408021,0.68828386],"study_design_scores_gemma":[0.00006743439,0.0003254094,0.12261181,0.37223065,0.011996787,0.001699507,0.0150769325,0.0017709616,0.002373882,0.007925746,0.46368346,0.00023738322],"about_ca_topic_score_codex":0.008828901,"about_ca_topic_score_gemma":0.014242529,"teacher_disagreement_score":0.8831639,"about_ca_system_score_codex":0.0040322095,"about_ca_system_score_gemma":0.016644072,"threshold_uncertainty_score":0.080561996},"labels":[],"label_agreement":null},{"id":"W4417240658","doi":"10.5267/j.jpm.2025.9.006","title":"Project portfolio management in the age of artificial intelligence: A review of challenges, key features, and future research directions","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Interpretability; Project portfolio management; Portfolio; Key (lock); Resource (disambiguation); Project management; Risk management","score_opus":0.19976148629253365,"score_gpt":0.4690067012819878,"score_spread":0.26924521498945414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417240658","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00019174966,0.99615234,0.00058831304,0.0023016916,0.0001696402,0.000009483687,0.00001322935,0.0000056778554,0.00056792883],"genre_scores_gemma":[0.0017262629,0.9964401,0.00085496804,0.00061857386,0.0002384959,0.000020557307,0.00001841733,0.0000024273127,0.000080170874],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99700755,0.0010740435,0.00059116463,0.0002974817,0.0009197392,0.00011013544],"domain_scores_gemma":[0.9831498,0.013370414,0.0011530981,0.00019298561,0.0018364256,0.00029721437],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0071641216,0.0009948455,0.0019326021,0.0057601454,0.0006711917,0.0043930244,0.0015761408,0.0025782418,0.0022525662],"category_scores_gemma":[0.011862194,0.00061742746,0.0011717165,0.008144392,0.0016475877,0.0056897257,0.001446199,0.0025587173,0.00058849546],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052159863,0.00008631802,0.00075820356,0.05987991,0.00022448585,0.00014057025,0.000549442,0.0017877596,0.0003692586,0.026534254,0.01591608,0.89370143],"study_design_scores_gemma":[0.00003640608,0.00025740144,0.0032655166,0.10755242,0.0005592227,0.00070602325,0.0013775782,0.0017714442,0.0003784913,0.046496704,0.8374801,0.000118772274],"about_ca_topic_score_codex":0.0024964141,"about_ca_topic_score_gemma":0.0041808304,"teacher_disagreement_score":0.0071641216,"about_ca_system_score_codex":0.0023292324,"about_ca_system_score_gemma":0.0068377554,"threshold_uncertainty_score":0.03788793},"labels":[],"label_agreement":null},{"id":"W44690716","doi":"","title":"Proposition d'un modèle d'affaires pour un centre favorisant l'innovation dans le secteur de la construction au Québec","year":2006,"lang":"fr","type":"article","venue":"Espace École de technologie supérieure (École de technologie supérieure)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.01726245536286853,"score_gpt":0.2715496965813405,"score_spread":0.25428724121847196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W44690716","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17719339,0.0015858132,0.37213728,0.013640671,0.0003947966,0.00043360254,0.0021875186,0.0006883353,0.4317386],"genre_scores_gemma":[0.8138778,0.001267106,0.051918134,0.00043718243,0.00005222515,0.00037569454,0.000589177,0.00008859828,0.13139412],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99925,0.00018889077,0.00002430883,0.0001458199,0.0002047053,0.0001862786],"domain_scores_gemma":[0.9986291,0.00029113257,0.00010150469,0.00007019615,0.00069967005,0.00020843267],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013407667,0.0006162995,0.0004582299,0.0013957063,0.0021188012,0.005242605,0.0020644118,0.0021920844,0.019280864],"category_scores_gemma":[0.0026224358,0.00051196915,0.0009777583,0.0015102574,0.0019504162,0.0026874498,0.0015994734,0.0014427265,0.0018078388],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011261181,0.00009453285,0.011597549,0.00016972121,0.00006611703,0.0003052297,0.0023017086,0.20358431,0.0012561013,0.7353568,0.010817773,0.034337517],"study_design_scores_gemma":[0.00010494114,0.00016287457,0.014881245,0.00041247,0.00023045836,0.0001912853,0.0038605945,0.73067665,0.0010959839,0.13159762,0.11664583,0.0001400512],"about_ca_topic_score_codex":0.627261,"about_ca_topic_score_gemma":0.5746843,"teacher_disagreement_score":0.37273902,"about_ca_system_score_codex":0.01620833,"about_ca_system_score_gemma":0.017911816,"threshold_uncertainty_score":0.7498683},"labels":[],"label_agreement":null},{"id":"W47203096","doi":"10.22260/isarc2013/0051","title":"Multi-Tiered Project Delivery Systems Selection for Capital Projects","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Integrated project delivery; Computer science; Project management; Selection (genetic algorithm); Hierarchy; General partnership; Operations research; Analytic hierarchy process; Systems engineering; Engineering management; Process management; Engineering; Business; Economics","score_opus":0.09908932129764575,"score_gpt":0.325275398430662,"score_spread":0.22618607713301625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W47203096","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036050558,0.0003229787,0.95345145,0.0001463689,0.000026428806,0.00086765917,0.00036856442,0.0005393855,0.008226588],"genre_scores_gemma":[0.27493933,0.00019405357,0.7218666,0.00004080588,0.000008889865,0.00051812973,0.00039147335,0.000105360414,0.001935373],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99219733,0.0037751738,0.0004294354,0.0007031519,0.0023943305,0.00050052005],"domain_scores_gemma":[0.9951875,0.0026275464,0.00054046616,0.0003272552,0.0011161391,0.000201005],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008318162,0.0011707001,0.0012320417,0.0056099724,0.0012362248,0.0032706065,0.001062818,0.0006893677,0.0078109694],"category_scores_gemma":[0.013952719,0.00077445235,0.0017084684,0.0034266391,0.00057198043,0.001761437,0.0018696106,0.000999525,0.00076633843],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034567437,0.00026416843,0.010806331,0.0008081503,0.00019105543,0.00027587885,0.0008010811,0.4608468,0.006829898,0.04705637,0.0048389747,0.46693563],"study_design_scores_gemma":[0.000083070525,0.00041588693,0.0060551954,0.00022933444,0.00012543883,0.00025472045,0.0006247783,0.93931997,0.008294873,0.031938035,0.012529157,0.00012953184],"about_ca_topic_score_codex":0.004399714,"about_ca_topic_score_gemma":0.0063003357,"teacher_disagreement_score":0.008318162,"about_ca_system_score_codex":0.0027400546,"about_ca_system_score_gemma":0.0036763232,"threshold_uncertainty_score":0.04399115},"labels":[],"label_agreement":null},{"id":"W51417976","doi":"10.1007/978-0-85729-594-1_3","title":"Rethinking Project Risk Management","year":2011,"lang":"en","type":"book-chapter","venue":"Springer series in reliability engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Risk management plan; Project risk management; Risk management; Risk analysis (engineering); IT risk management; Schedule; Documentation; Enterprise risk management; Risk management framework; Project management triangle; Project management; Process management; Process (computing); Computer science; Engineering; Business; Systems engineering","score_opus":0.05334740418630363,"score_gpt":0.2801749908486636,"score_spread":0.22682758666235997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W51417976","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023247974,0.04108273,0.74920213,0.047131505,0.003654228,0.000063940155,0.000105972285,0.0009937708,0.13451776],"genre_scores_gemma":[0.4583151,0.034771644,0.379307,0.00517042,0.0035094367,0.00014115885,0.00020869904,0.0016002075,0.11697631],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99636567,0.0013653168,0.00019280432,0.00026964748,0.0016599195,0.00014672507],"domain_scores_gemma":[0.9911515,0.005790047,0.00042064674,0.0012493788,0.0011835678,0.00020481818],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008081849,0.0010815149,0.00069669867,0.001837891,0.00072693906,0.0055712773,0.0016792446,0.0017682028,0.006720672],"category_scores_gemma":[0.017112734,0.0005693541,0.0006669778,0.0012043254,0.0032741728,0.009624966,0.0033150732,0.0044279303,0.0015146061],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020011697,0.000048313563,0.00089336006,0.00021324163,0.000052688014,0.00012271051,0.0021060638,0.011237388,0.0010456914,0.4741296,0.01835904,0.4917719],"study_design_scores_gemma":[0.000006649438,0.000034470668,0.00065169967,0.00035735735,0.00003830102,0.0001458373,0.0007247871,0.015513304,0.000734858,0.8614888,0.12026006,0.000043772354],"about_ca_topic_score_codex":0.0015169356,"about_ca_topic_score_gemma":0.002163488,"teacher_disagreement_score":0.008081849,"about_ca_system_score_codex":0.0014340052,"about_ca_system_score_gemma":0.0015560492,"threshold_uncertainty_score":0.042741418},"labels":[],"label_agreement":null},{"id":"W573831948","doi":"","title":"Quality and Life-Cycle Costs in Performance-Based Contracts : Multiple Case Study","year":2010,"lang":"en","type":"article","venue":"Journal of Performance of Constructed Facilities","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Incentive; Bidding; Quality (philosophy); Payment; Prestige; Competition (biology); Business; Economics; Industrial organization; Finance; Marketing; Microeconomics","score_opus":0.06848356332336145,"score_gpt":0.34692254271284223,"score_spread":0.2784389793894808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W573831948","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9761791,0.0006277709,0.005987816,0.0005379219,0.000014066704,0.0005406895,0.00038865115,0.000009411769,0.015714597],"genre_scores_gemma":[0.99437165,0.00027508155,0.0031875984,0.00002356624,0.000008861459,0.00026752593,0.00010437483,0.0000062336376,0.0017550469],"study_design_codex":"simulation_or_modeling","study_design_gemma":"qualitative","domain_scores_codex":[0.98744744,0.008426446,0.0005184901,0.00044383755,0.0015874596,0.001576305],"domain_scores_gemma":[0.92125326,0.06520804,0.0052067186,0.0020976004,0.0038107084,0.0024236406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015577169,0.00061550504,0.00087269134,0.002651503,0.002600055,0.004798074,0.0022155885,0.003157303,0.005026434],"category_scores_gemma":[0.028521545,0.0005911869,0.0016431123,0.0047147786,0.0023539057,0.0037816346,0.0018729576,0.002279142,0.000310713],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0043152673,0.014652786,0.19245231,0.0017237044,0.0007849068,0.009732166,0.016746124,0.43871003,0.0017730439,0.2153319,0.005655079,0.098122686],"study_design_scores_gemma":[0.0016124366,0.010416081,0.18489218,0.0013494368,0.00092595106,0.0030940052,0.075770594,0.6078736,0.005018825,0.07481477,0.033640802,0.0005912978],"about_ca_topic_score_codex":0.02162989,"about_ca_topic_score_gemma":0.01905573,"teacher_disagreement_score":0.02162989,"about_ca_system_score_codex":0.016544756,"about_ca_system_score_gemma":0.003740001,"threshold_uncertainty_score":0.12004119},"labels":[],"label_agreement":null},{"id":"W58734260","doi":"","title":"Managing multiple projects: a literature review of setting priorities and a pilot survey of healthcare researchers in an academic setting.","year":2007,"lang":"en","type":"review","venue":"PubMed","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University; Hamilton Health Sciences; Programs for Assessment of Technology in Health Research Institute","funders":"","keywords":"Best practice; Resource (disambiguation); Ranking (information retrieval); Health care; Business; Operations management; Knowledge management; Process management; Computer science; Engineering; Management","score_opus":0.48969644750922947,"score_gpt":0.49180558408540925,"score_spread":0.002109136576179782,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W58734260","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":"incentives","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":"incentives","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0067722066,0.988478,0.000974262,0.0014797883,0.00018275909,0.0003796225,0.00016269308,0.000016115695,0.0015545081],"genre_scores_gemma":[0.037052978,0.9562139,0.004820631,0.0008790645,0.0000677693,0.0005434504,0.00022677275,0.0000061069263,0.00018939949],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98117524,0.008969864,0.004646967,0.00077298185,0.004073433,0.0003615493],"domain_scores_gemma":[0.935954,0.042966824,0.0071717324,0.0008094098,0.012010128,0.0010878989],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.028504081,0.00091234944,0.002459606,0.0139821395,0.00090824254,0.0022253182,0.0017955182,0.0017765446,0.0015422844],"category_scores_gemma":[0.06577733,0.00091109716,0.0012375885,0.018685775,0.0005503758,0.004109022,0.0012542026,0.0009552576,0.0004964441],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020386864,0.00022953744,0.005554049,0.1539395,0.0004453843,0.00060302456,0.0030914927,0.00037585126,0.0003982679,0.0008285079,0.011080515,0.82324994],"study_design_scores_gemma":[0.00041682314,0.002687637,0.06926357,0.5994623,0.0058812858,0.0062891548,0.030556567,0.0010502363,0.0019788714,0.0025063278,0.27962202,0.00028517225],"about_ca_topic_score_codex":0.006078902,"about_ca_topic_score_gemma":0.017663715,"teacher_disagreement_score":0.9714959,"about_ca_system_score_codex":0.0038431226,"about_ca_system_score_gemma":0.016871208,"threshold_uncertainty_score":0.15074581},"labels":[],"label_agreement":null},{"id":"W589908688","doi":"","title":"A Highway Design-Build-Maintain-Warranty Case Study","year":2010,"lang":"en","type":"article","venue":"Journal of Performance of Constructed Facilities","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Incentive; Warranty; Bidding; Payment; Business; Economics; Industrial organization; Transport engineering; Finance; Engineering; Marketing; Microeconomics","score_opus":0.06373737374108347,"score_gpt":0.3337821924895912,"score_spread":0.2700448187485077,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W589908688","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9508608,0.0005641714,0.006108982,0.0025475754,0.000055493416,0.00053246046,0.00082510203,0.00007012237,0.038435303],"genre_scores_gemma":[0.9704112,0.00059488206,0.00871551,0.0003113624,0.00003211277,0.00021912869,0.0005436319,0.000032096912,0.019139916],"study_design_codex":"case_report","study_design_gemma":"case_report","domain_scores_codex":[0.9980868,0.0008283047,0.00009796522,0.00014659076,0.00048000217,0.00036038895],"domain_scores_gemma":[0.9978801,0.0008993883,0.00019986254,0.00017664068,0.00034009063,0.0005039329],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019070993,0.0005025659,0.00038887156,0.0013618176,0.00424166,0.0016330183,0.0017408893,0.0031651799,0.00879899],"category_scores_gemma":[0.002857515,0.00032750997,0.0005479784,0.0022097162,0.001219601,0.0014305626,0.0015512516,0.0013139341,0.00097517483],"study_design_candidate":"case_report","study_design_consensus":"case_report","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017860547,0.013093751,0.15807141,0.0032028807,0.00035779973,0.2467051,0.0861709,0.060224216,0.011606343,0.1206307,0.0809907,0.21716022],"study_design_scores_gemma":[0.00052977767,0.00435426,0.16204011,0.00096017576,0.00021716565,0.040605582,0.26427582,0.049899086,0.008951615,0.019928074,0.4479408,0.00029754135],"about_ca_topic_score_codex":0.02199914,"about_ca_topic_score_gemma":0.05738486,"teacher_disagreement_score":0.02199914,"about_ca_system_score_codex":0.0053225406,"about_ca_system_score_gemma":0.0024352125,"threshold_uncertainty_score":0.04374218},"labels":[],"label_agreement":null},{"id":"W591335158","doi":"","title":"Highway Maintenance Costs and Contracting Policy","year":2010,"lang":"en","type":"article","venue":"Evaluation and Program Planning","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Incentive; Bidding; Payment; Prestige; Business; Economics; Public economics; Industrial organization; Finance; Marketing; Market economy","score_opus":0.11476656263173059,"score_gpt":0.47659789508990613,"score_spread":0.36183133245817556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W591335158","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4423891,0.017383892,0.015584679,0.036910564,0.00028030493,0.0002861775,0.002705072,0.00013945116,0.48432076],"genre_scores_gemma":[0.9725114,0.00288932,0.001914926,0.0013177635,0.00016031186,0.000090951085,0.00052571984,0.00002710381,0.020562574],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99237216,0.0027963014,0.00043363628,0.00045475847,0.0023259262,0.0016171718],"domain_scores_gemma":[0.9781105,0.012187986,0.0034427496,0.001051976,0.0042210342,0.000985788],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007400509,0.00027047118,0.00027812112,0.0020174254,0.001109419,0.004876202,0.0009832437,0.0018210167,0.01269166],"category_scores_gemma":[0.024076264,0.00030727693,0.00038297786,0.002664732,0.0017016627,0.003414096,0.0012083546,0.0012116492,0.0006769029],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022231591,0.00015603335,0.03777159,0.00053847115,0.00010207526,0.00009997865,0.0012012648,0.036615167,0.0004249767,0.81143755,0.018785268,0.09264534],"study_design_scores_gemma":[0.00013367579,0.00062212994,0.23201856,0.0026056354,0.000212484,0.0004401134,0.010147809,0.047312103,0.0022876416,0.31920883,0.38481158,0.00019939983],"about_ca_topic_score_codex":0.031447146,"about_ca_topic_score_gemma":0.024886603,"teacher_disagreement_score":0.031447146,"about_ca_system_score_codex":0.011163178,"about_ca_system_score_gemma":0.0064943368,"threshold_uncertainty_score":0.080994904},"labels":[],"label_agreement":null},{"id":"W595168423","doi":"","title":"TRENDS TO WATCH IN ROAD TECHNOLOGY","year":2002,"lang":"en","type":"article","venue":"Better roads","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Agency (philosophy); Transport engineering; Integrated project delivery; Engineering management; Road construction; Engineering; Project management; Design–build; Construction management; Business; Civil engineering; Systems engineering","score_opus":0.08779979907393803,"score_gpt":0.35109228800978864,"score_spread":0.2632924889358506,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W595168423","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13977261,0.11317565,0.006355428,0.23548888,0.0065283007,0.00012843039,0.0038057566,0.00094882323,0.49379608],"genre_scores_gemma":[0.68696725,0.10470418,0.0072359727,0.026836703,0.0034654434,0.00015135916,0.005051581,0.00036254505,0.16522494],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980714,0.00032041362,0.00012084957,0.00026019473,0.0008684589,0.00035867566],"domain_scores_gemma":[0.99526167,0.0014427154,0.00088990794,0.00025026168,0.0014865949,0.0006687499],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025617213,0.00021316338,0.0002469137,0.0026316263,0.00069639954,0.0046222066,0.00060052547,0.0017700924,0.02311996],"category_scores_gemma":[0.0063580647,0.00013879273,0.0003742167,0.0063984287,0.00094622746,0.0068220617,0.0012186697,0.0017830856,0.0035248303],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021478739,0.00015429624,0.054680515,0.0018758279,0.00004157899,0.00027126176,0.0044344454,0.0005473261,0.0022754616,0.1385058,0.18360215,0.61339647],"study_design_scores_gemma":[0.000008209922,0.0001288436,0.063447386,0.0004354705,0.000023917783,0.00024798876,0.0095346505,0.00027566255,0.0006793956,0.0061098686,0.9190826,0.000026060094],"about_ca_topic_score_codex":0.008812834,"about_ca_topic_score_gemma":0.017198335,"teacher_disagreement_score":0.02311996,"about_ca_system_score_codex":0.00262674,"about_ca_system_score_gemma":0.0025568132,"threshold_uncertainty_score":0.07734394},"labels":[],"label_agreement":null},{"id":"W599160489","doi":"","title":"Louisiana Highway Construction Cost Trends After Hurricanes Katrina and Rita","year":2008,"lang":"en","type":"article","venue":"Transportation Research Board 87th Annual MeetingTransportation Research Board","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hurricane katrina; Index (typography); Quarter (Canadian coin); Transport engineering; Agency (philosophy); Cost estimate; Natural disaster; Engineering; Geography; Civil engineering; Environmental science; Meteorology; Computer science; Archaeology","score_opus":0.13389305107511162,"score_gpt":0.4233531345661611,"score_spread":0.28946008349104946,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W599160489","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99190265,0.00011225019,0.000112800706,0.00017930211,0.0000046478426,0.000008664915,0.004838321,0.000021282307,0.0028201228],"genre_scores_gemma":[0.9871092,0.00018678272,0.0002747694,0.00003544748,0.000009381045,0.000022750255,0.008602176,0.000009139261,0.0037501734],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9996767,0.000029457586,0.000027464454,0.000044019358,0.00013989056,0.00008248925],"domain_scores_gemma":[0.99780566,0.00014528468,0.00075306965,0.000052658183,0.0010999023,0.0001434649],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023459527,0.00017570167,0.000143342,0.0016737913,0.00029715165,0.0007377245,0.00019373598,0.00024050157,0.0017729138],"category_scores_gemma":[0.0012917923,0.00009530097,0.00015653543,0.0022535278,0.00014177737,0.00041657608,0.00031492306,0.00037796874,0.00042739243],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010369484,0.000046628204,0.97952247,0.000027470607,0.000040458428,0.00007793845,0.00027518265,0.001856307,0.0006838275,0.00020050287,0.0029496024,0.014215904],"study_design_scores_gemma":[6.547415e-7,0.000024483315,0.9973997,0.0000031920158,0.0000036219226,0.000021779442,0.00027057188,0.0004886102,0.00015735113,0.000012056909,0.0016139153,0.000004109401],"about_ca_topic_score_codex":0.12159856,"about_ca_topic_score_gemma":0.27008826,"teacher_disagreement_score":0.12159856,"about_ca_system_score_codex":0.002648044,"about_ca_system_score_gemma":0.0008568603,"threshold_uncertainty_score":0.24178153},"labels":[],"label_agreement":null},{"id":"W600772179","doi":"","title":"Factors Potentially Influencing Productivity in Performance-Based Maintenance Contracts (PBMC)-- An International Study of Roads from Sweden","year":2013,"lang":"en","type":"article","venue":"Transportation Research Board 92nd Annual MeetingTransportation Research Board","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Business; Competition (biology); Service (business); Operations management; Marketing; Industrial organization; Engineering; Economics; Economic growth","score_opus":0.16651131350337506,"score_gpt":0.4265702174395981,"score_spread":0.26005890393622305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W600772179","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99396634,0.00021980295,0.00016054664,0.00020459089,0.0000070036867,0.000016541633,0.00004925052,0.0000035912158,0.005372185],"genre_scores_gemma":[0.99827945,0.00030383043,0.00017837524,0.000027702503,0.000003304707,0.000015140336,0.00006889246,0.000004886528,0.00111836],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9955584,0.0020188338,0.00042763434,0.0002920571,0.0009789245,0.000724169],"domain_scores_gemma":[0.98106486,0.008851338,0.0042798277,0.0005315477,0.0039652283,0.0013070749],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0059949714,0.00021516556,0.00025547293,0.0019885406,0.0026181904,0.004386764,0.00072023825,0.00056770485,0.0019345519],"category_scores_gemma":[0.014115338,0.00025701697,0.00028418502,0.0031752535,0.0011654389,0.0016385138,0.0016515739,0.0007057398,0.00047418577],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001818676,0.00036231353,0.7316232,0.00047194335,0.000056715973,0.0031429285,0.17402968,0.0012645599,0.000945814,0.0036444392,0.0027918764,0.08148462],"study_design_scores_gemma":[0.000009086424,0.00028276746,0.559612,0.00039114943,0.000051955423,0.0013308558,0.41207552,0.00067547313,0.0005816781,0.00040290668,0.024547368,0.000039231705],"about_ca_topic_score_codex":0.03320064,"about_ca_topic_score_gemma":0.036595203,"teacher_disagreement_score":0.03320064,"about_ca_system_score_codex":0.0045218156,"about_ca_system_score_gemma":0.004175117,"threshold_uncertainty_score":0.06601483},"labels":[],"label_agreement":null},{"id":"W605019134","doi":"10.17226/14270","title":"Bridge Management Systems for Transportation Agency Decision Making","year":2009,"lang":"en","type":"book","venue":"National Academies Press eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Agency (philosophy); Engineering; Transport engineering; Construction engineering; Business; Civil engineering; Sociology","score_opus":0.15265633738977852,"score_gpt":0.4002278639557762,"score_spread":0.24757152656599768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W605019134","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006596443,0.021453502,0.14650664,0.032319035,0.0015157963,0.00023654771,0.00040091068,0.00043930177,0.7905318],"genre_scores_gemma":[0.39718232,0.042181976,0.371591,0.0055597816,0.0017064644,0.0011555989,0.0014220232,0.00025396256,0.17894688],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99815136,0.000946401,0.00010880907,0.00018346698,0.0005095396,0.000100428304],"domain_scores_gemma":[0.99820924,0.0010064177,0.00015657078,0.00018392997,0.00033094987,0.00011293362],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035328919,0.00067243935,0.0003153656,0.0014371962,0.0020406875,0.008872693,0.0011995604,0.0017846522,0.026476756],"category_scores_gemma":[0.0055228393,0.00031817998,0.0005524639,0.002460858,0.003149485,0.0068983673,0.003147032,0.0019583437,0.0041333027],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000076104575,0.000027408927,0.00024330751,0.00018432122,0.000011807616,0.000051664076,0.0011791902,0.0038556177,0.00011982829,0.81419593,0.041784316,0.13833897],"study_design_scores_gemma":[0.000010889289,0.000027232714,0.0004995296,0.00066660537,0.000011014612,0.00008420253,0.0017273707,0.00409698,0.0001391189,0.48193228,0.5107806,0.000024197612],"about_ca_topic_score_codex":0.0065987804,"about_ca_topic_score_gemma":0.010449311,"teacher_disagreement_score":0.026476756,"about_ca_system_score_codex":0.0038880464,"about_ca_system_score_gemma":0.005372841,"threshold_uncertainty_score":0.088573635},"labels":[],"label_agreement":null},{"id":"W610494263","doi":"","title":"Incentives, Results and Possible Success Factors for Rail Maintenance Performance-Based Contracting : Case Study","year":2010,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Incentive; Bidding; Payment; Prestige; Business; Industrial organization; Economics; Finance; Marketing; Microeconomics","score_opus":0.057854404657051904,"score_gpt":0.31180493907940615,"score_spread":0.25395053442235427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W610494263","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9884863,0.00018359355,0.0020035561,0.00046012338,0.000006234526,0.00025458005,0.00006139494,0.000009113984,0.008535061],"genre_scores_gemma":[0.9949463,0.0001674805,0.0024539747,0.000035779547,0.0000063349917,0.00012618772,0.000033132234,0.000004692875,0.0022261976],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99197865,0.0050981417,0.0003855205,0.000320341,0.00088920374,0.001328166],"domain_scores_gemma":[0.9693934,0.022872169,0.0029648114,0.0012198759,0.0015723187,0.0019774442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013959012,0.00036952778,0.0003789024,0.0016253446,0.0032928933,0.0027190363,0.0011953652,0.0027245576,0.0054052],"category_scores_gemma":[0.020602796,0.00033959563,0.0006720767,0.0018424472,0.0015192017,0.0017646555,0.0014409786,0.0010847449,0.0004337665],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0035090516,0.025027655,0.51635885,0.0018561166,0.00033501984,0.035194196,0.075486325,0.031377766,0.0068450277,0.13792795,0.006665707,0.15941636],"study_design_scores_gemma":[0.0010401857,0.012948254,0.4906537,0.0014967386,0.00055362756,0.019470999,0.2907735,0.08466931,0.016789805,0.029015446,0.05212101,0.0004674762],"about_ca_topic_score_codex":0.0060776835,"about_ca_topic_score_gemma":0.009414413,"teacher_disagreement_score":0.013959012,"about_ca_system_score_codex":0.0052519664,"about_ca_system_score_gemma":0.0026929,"threshold_uncertainty_score":0.073823154},"labels":[],"label_agreement":null},{"id":"W620666513","doi":"10.18848/2327-7998/cgp/v12i04/50810","title":"Learning from Project Experience: Creating, Capturing and Sharing Knowledge","year":2013,"lang":"en","type":"article","venue":"Knowledge Management An International Journal","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Knowledge management; Computer science; Knowledge sharing","score_opus":0.09689003614775936,"score_gpt":0.3993532107469633,"score_spread":0.3024631745992039,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W620666513","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8399342,0.0016354593,0.09463281,0.004782944,0.00008552709,0.0007925394,0.0001211569,0.00016648689,0.05784888],"genre_scores_gemma":[0.97221744,0.0007845616,0.023355376,0.00020866735,0.00002598303,0.0001931743,0.00008577152,0.000039910825,0.0030891595],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9756094,0.019076271,0.00068071584,0.0010525783,0.0025032002,0.0010777984],"domain_scores_gemma":[0.97446954,0.0166023,0.002146001,0.003435901,0.0015396862,0.0018065436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012291578,0.00059603446,0.00040041178,0.0027460884,0.0034268086,0.008623477,0.0018865176,0.001814412,0.0020985883],"category_scores_gemma":[0.036325134,0.00063484657,0.00048305898,0.0020157709,0.008043587,0.011293887,0.0102246925,0.0015897191,0.00048596231],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008618995,0.00031944818,0.025652118,0.00080571824,0.00006156066,0.0017920829,0.7481862,0.00095615996,0.0035296504,0.014079792,0.0026137093,0.20191747],"study_design_scores_gemma":[0.00007370343,0.00071778585,0.028336842,0.0020048507,0.00013703796,0.0044466155,0.7512286,0.003957752,0.0057838843,0.047155038,0.15595868,0.00019931719],"about_ca_topic_score_codex":0.0017277612,"about_ca_topic_score_gemma":0.0016849507,"teacher_disagreement_score":0.012291578,"about_ca_system_score_codex":0.0016080606,"about_ca_system_score_gemma":0.0039065597,"threshold_uncertainty_score":0.065004885},"labels":[],"label_agreement":null},{"id":"W622175996","doi":"","title":"Applying Context Sensitive Design to the Innovative Development of Major Highway Projects","year":2004,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Principal (computer security); Flexibility (engineering); Consistency (knowledge bases); Heuristics; Task (project management); Credibility; Creativity; Transport engineering; Engineering; Geometric design; Management science; Computer science; Engineering management; Operations research; Systems engineering; Political science; Computer security; Management; Geography; Artificial intelligence; Economics","score_opus":0.15230859237525204,"score_gpt":0.3513812976111286,"score_spread":0.19907270523587653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W622175996","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13754165,0.001611356,0.7992879,0.0027294194,0.00013684487,0.0010041299,0.00008100317,0.0004574589,0.057150275],"genre_scores_gemma":[0.65650445,0.00080623024,0.34020847,0.00028906667,0.000023544459,0.00042755317,0.000053797678,0.000061935745,0.0016248436],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9826528,0.013053525,0.00063072745,0.0008940829,0.0020657254,0.0007032708],"domain_scores_gemma":[0.9871945,0.008885101,0.001008294,0.0013228942,0.0010651455,0.0005241147],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010972253,0.00084060256,0.0004424411,0.0025707274,0.0028276313,0.004783764,0.0015293049,0.0016586706,0.0019995864],"category_scores_gemma":[0.015949996,0.00076873746,0.00079521374,0.0015332447,0.0057028295,0.0027903032,0.0048900233,0.0015523185,0.000244353],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029582964,0.0004862595,0.011343414,0.0013023849,0.00015579823,0.0011343755,0.028079124,0.13837828,0.008440609,0.44043556,0.0027835967,0.36716473],"study_design_scores_gemma":[0.00027393698,0.0016331135,0.008651277,0.0013218893,0.0003023272,0.0013282027,0.029069908,0.22014007,0.019292101,0.5079203,0.20975459,0.00031225983],"about_ca_topic_score_codex":0.0053138006,"about_ca_topic_score_gemma":0.011397839,"teacher_disagreement_score":0.010972253,"about_ca_system_score_codex":0.005109306,"about_ca_system_score_gemma":0.005376542,"threshold_uncertainty_score":0.058027506},"labels":[],"label_agreement":null},{"id":"W626940733","doi":"","title":"New Brunswick Department of Transportation and Infrastructure's Strategic Multi-Criteria Analysis Model for Capital Infrastructure Investments","year":2014,"lang":"fr","type":"article","venue":"Transportation 2014: Past, Present, Future - 2014 Conference and Exhibition of the Transportation Association of Canada // Transport 2014 : Du passé vers l'avenir - 2014 Congrès et Exposition de 'Association des transports du Canada","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Asset management; Stakeholder; Capital budgeting; Plan (archaeology); Finance; Government (linguistics); Business; Asset (computer security); Transport engineering; Computer science; Economics; Project appraisal; Engineering","score_opus":0.014790907650712583,"score_gpt":0.2504364981519385,"score_spread":0.23564559050122594,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W626940733","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031277347,0.0025734098,0.51146704,0.014825554,0.0005853384,0.002638077,0.02706442,0.00070557906,0.4088633],"genre_scores_gemma":[0.4296184,0.0040933006,0.44230533,0.0014318328,0.000069978145,0.004311379,0.011617849,0.00020602626,0.106345885],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970692,0.0010090092,0.00014449096,0.0002629589,0.0011446339,0.00036976812],"domain_scores_gemma":[0.99752754,0.00068645185,0.00016441458,0.00008950308,0.0014209308,0.00011117316],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033047854,0.0016642712,0.00068042433,0.0040320815,0.0016241905,0.004492556,0.0029380708,0.0015194922,0.0063659316],"category_scores_gemma":[0.003935013,0.00082067196,0.0016057465,0.006503431,0.0010331189,0.0014414774,0.0013321177,0.0021540187,0.0010684727],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056583885,0.00011029105,0.006740227,0.0003519445,0.00011035796,0.00044787224,0.00044824355,0.54901814,0.00095620955,0.3346174,0.05428492,0.0528578],"study_design_scores_gemma":[0.00007418693,0.00008743058,0.004683965,0.00045444287,0.000077523706,0.00015649067,0.0012888098,0.67110324,0.0009093218,0.05846694,0.26254982,0.000147841],"about_ca_topic_score_codex":0.755627,"about_ca_topic_score_gemma":0.8237175,"teacher_disagreement_score":0.24437302,"about_ca_system_score_codex":0.045372725,"about_ca_system_score_gemma":0.04985671,"threshold_uncertainty_score":0.49162436},"labels":[],"label_agreement":null},{"id":"W627246810","doi":"10.17226/14035","title":"Preserving and Using Institutional Memory Through Knowledge Management Practices","year":2007,"lang":"en","type":"book","venue":"Transportation Research Board eBooks","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Knowledge management; Organizational memory; Psychology; Computer science; Process management; Business; Organizational learning","score_opus":0.4150075910716746,"score_gpt":0.5080204127041149,"score_spread":0.09301282163244029,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W627246810","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12458599,0.011040119,0.048120353,0.01993769,0.00032102253,0.00020783224,0.00011116737,0.00062367955,0.79505205],"genre_scores_gemma":[0.8568885,0.012240395,0.039898824,0.0013529578,0.00011795649,0.00015087267,0.00014800407,0.00015044423,0.08905217],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99424475,0.0028263666,0.00028150078,0.00047157754,0.0015692844,0.00060653535],"domain_scores_gemma":[0.9934331,0.0024734256,0.00073261664,0.001516991,0.0013293304,0.0005145322],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007570306,0.00036654327,0.0002246131,0.0034929616,0.004529143,0.013334649,0.002588036,0.001044096,0.0051976657],"category_scores_gemma":[0.009374762,0.00024395261,0.000361431,0.0046224985,0.011238868,0.009674674,0.005525485,0.0013584883,0.0010402694],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014502182,0.00012059819,0.0042898273,0.00045498784,0.000017753895,0.00044367794,0.10377179,0.0006894606,0.00068949023,0.14356993,0.019888211,0.7260497],"study_design_scores_gemma":[0.000009383488,0.00007225495,0.0035847202,0.0015136473,0.00002916364,0.000630373,0.10468978,0.00049730315,0.001587644,0.039494906,0.8478502,0.000040678115],"about_ca_topic_score_codex":0.025551634,"about_ca_topic_score_gemma":0.04988399,"teacher_disagreement_score":0.025551634,"about_ca_system_score_codex":0.008606917,"about_ca_system_score_gemma":0.01645986,"threshold_uncertainty_score":0.062447786},"labels":[],"label_agreement":null},{"id":"W643107635","doi":"","title":"METHODOLOGY TO EVALUATE SHARED SERVICES OPPORTUNITIES AT THE VANCOUVER POLICE DEPARTMENT","year":2010,"lang":"en","type":"article","venue":"Summit (Simon Fraser University)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Police department; Criminology; Sociology","score_opus":0.13927207182018056,"score_gpt":0.3398569563242264,"score_spread":0.20058488450404585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W643107635","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33821347,0.00058166165,0.5072498,0.00076892524,0.00016143391,0.085031845,0.0026628228,0.00059952494,0.064730495],"genre_scores_gemma":[0.28559354,0.00027077622,0.6469215,0.00017080345,0.000022167753,0.060032465,0.0009947321,0.000050175433,0.005943812],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9632447,0.020664781,0.0031243295,0.001673544,0.009940653,0.0013520202],"domain_scores_gemma":[0.9540664,0.013148384,0.0054388125,0.002294313,0.023364162,0.0016878713],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.026979646,0.0013557593,0.0007697322,0.007072145,0.0028745625,0.0031116637,0.0019942038,0.00093636167,0.0054094596],"category_scores_gemma":[0.033068698,0.0007075375,0.000858748,0.0037207769,0.0012958081,0.0014493266,0.003107383,0.0010962323,0.00080582366],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014528052,0.0043766657,0.10971233,0.0030389111,0.00043325976,0.0006671643,0.019671299,0.020452743,0.019954838,0.035194915,0.0071580578,0.77788705],"study_design_scores_gemma":[0.0034031533,0.030127035,0.2921905,0.0038321416,0.0008750875,0.001562597,0.14598289,0.1492136,0.11506993,0.047360536,0.20928326,0.0010992226],"about_ca_topic_score_codex":0.02187648,"about_ca_topic_score_gemma":0.033368316,"teacher_disagreement_score":0.97812355,"about_ca_system_score_codex":0.007975011,"about_ca_system_score_gemma":0.018046755,"threshold_uncertainty_score":0.14268368},"labels":[],"label_agreement":null},{"id":"W645563311","doi":"","title":"Design-Build Done Right","year":2005,"lang":"en","type":"article","venue":"Bridges Conversations in Global Politics and Public Policy","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Plan (archaeology); Process (computing); Project team; Work (physics); Focus (optics); Key (lock); Set (abstract data type); Design–build; Computer science; Engineering management; Track (disk drive); Engineering design process; Process management; Engineering; Knowledge management; Computer security","score_opus":0.06147125969702919,"score_gpt":0.356024790985838,"score_spread":0.2945535312888088,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W645563311","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025979052,0.0012224382,0.07614455,0.033103652,0.0027015407,0.00020387777,0.00020207062,0.0012768052,0.88254726],"genre_scores_gemma":[0.15041783,0.0025112834,0.08834832,0.028221402,0.0007525327,0.0005567662,0.00057227013,0.002799165,0.7258205],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9793625,0.007210547,0.0008233011,0.0023962925,0.008211056,0.0019962317],"domain_scores_gemma":[0.9844604,0.0029914249,0.00049729296,0.006730475,0.0035970982,0.0017233301],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015089549,0.0011213527,0.0006317448,0.001496159,0.006444962,0.012584226,0.0016821208,0.0054898835,0.07644558],"category_scores_gemma":[0.03145223,0.0009635817,0.001097215,0.0009689573,0.009007276,0.012140391,0.010361568,0.0067547727,0.04318892],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003926631,0.00009087734,0.0012387502,0.00023182174,0.00003633352,0.00029936133,0.004818714,0.0007862086,0.000786548,0.62939423,0.22011498,0.14216287],"study_design_scores_gemma":[0.000010429457,0.00001979601,0.00022289998,0.00013595646,0.000008409678,0.0001510739,0.0006479788,0.00015075998,0.00035167177,0.034625698,0.96365756,0.000017867771],"about_ca_topic_score_codex":0.0061257905,"about_ca_topic_score_gemma":0.009599156,"teacher_disagreement_score":0.07644558,"about_ca_system_score_codex":0.0040222066,"about_ca_system_score_gemma":0.010279968,"threshold_uncertainty_score":0.25573593},"labels":[],"label_agreement":null},{"id":"W6893188724","doi":"10.5281/zenodo.1484649","title":"Deterministic Project Management With Ai Applicability In Globalized Context","year":2018,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Project management; Project management triangle; Context (archaeology); Process (computing); Project manager; Extreme project management; Project planning; Project charter; Project team","score_opus":0.08783320739379982,"score_gpt":0.35161740209074804,"score_spread":0.26378419469694825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6893188724","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11768959,0.0013468973,0.86330724,0.00097422703,0.000055369695,0.000104748266,0.00007437673,0.00028937677,0.01615809],"genre_scores_gemma":[0.9126943,0.00059139164,0.08521451,0.000052890227,0.000039910698,0.00009544341,0.000054478875,0.000028778142,0.0012282977],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9967528,0.0014868364,0.00014819285,0.00070143316,0.00065712753,0.00025368054],"domain_scores_gemma":[0.9946812,0.0026245795,0.0011040834,0.00090481836,0.00043194366,0.00025343883],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029995136,0.0005495619,0.0006918638,0.00095485,0.0006583049,0.0034280594,0.00090078224,0.00059026864,0.001520093],"category_scores_gemma":[0.006212307,0.00033141792,0.00045860722,0.0012951357,0.0023444926,0.002304112,0.0033604489,0.0013289751,0.00023487119],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012687415,0.00010139463,0.010552638,0.00037723224,0.00012981502,0.0004196593,0.0012461072,0.5510277,0.0039564585,0.26456156,0.0011052265,0.16639528],"study_design_scores_gemma":[0.00003209401,0.0002550889,0.005457673,0.00010193135,0.00005773689,0.00016411577,0.00088462926,0.6881647,0.0018198342,0.2914319,0.011577233,0.00005314529],"about_ca_topic_score_codex":0.0020519726,"about_ca_topic_score_gemma":0.0025948035,"teacher_disagreement_score":0.0034280594,"about_ca_system_score_codex":0.0014314211,"about_ca_system_score_gemma":0.002006076,"threshold_uncertainty_score":0.01586312},"labels":[],"label_agreement":null},{"id":"W6901730807","doi":"10.60692/p6k60-0eh05","title":"Conceptual estimation of construction duration and cost of public highway projects","year":2022,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Duration (music); Cost estimate; Estimation; Procurement; Payment; Process (computing); Baseline (sea); Project management; Judgement; Construction management","score_opus":0.12024200146509864,"score_gpt":0.2819029407701721,"score_spread":0.16166093930507344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6901730807","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7030497,0.00034353437,0.29055294,0.00014614796,0.00002345241,0.00016394134,0.0015370388,0.00026040015,0.003922805],"genre_scores_gemma":[0.9437392,0.00014446843,0.054199312,0.000009096025,0.000008522098,0.00012454076,0.0012601032,0.000017745255,0.0004969604],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99852425,0.000387578,0.00018421326,0.00029233418,0.00050779746,0.00010375554],"domain_scores_gemma":[0.9945286,0.0027058215,0.0012109425,0.00041688085,0.0010329694,0.00010480408],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002143337,0.0006171215,0.00036323027,0.003494585,0.0002593152,0.0012543357,0.0010106912,0.00056362967,0.0010219621],"category_scores_gemma":[0.012585162,0.00034774424,0.00059017324,0.0025559438,0.00026565522,0.0014822644,0.00086794747,0.00047432567,0.00015301953],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014291753,0.00016565638,0.1644845,0.00023808143,0.000119461045,0.00014470208,0.0004354013,0.6551585,0.0019141003,0.0084808385,0.0011117446,0.16760404],"study_design_scores_gemma":[0.0000067944893,0.00007520057,0.066904575,0.00003866869,0.000033504177,0.00007633486,0.00033466014,0.9270991,0.0015320976,0.0023895265,0.0014751675,0.00003441174],"about_ca_topic_score_codex":0.012992626,"about_ca_topic_score_gemma":0.012666869,"teacher_disagreement_score":0.012992626,"about_ca_system_score_codex":0.0019347867,"about_ca_system_score_gemma":0.0016386324,"threshold_uncertainty_score":0.025833964},"labels":[],"label_agreement":null},{"id":"W6901942985","doi":"10.60692/x8vny-yt616","title":"A dimensional analysis of stakeholder assessment of project outcomes","year":2019,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University of Edmonton","funders":"","keywords":"Project stakeholder; Project sponsorship; Project charter; Stakeholder; Project management; Project management triangle; Stakeholder analysis; Project planning; Project risk management","score_opus":0.15758832060732653,"score_gpt":0.34270371924639054,"score_spread":0.185115398639064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6901942985","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9022203,0.0002376494,0.07163773,0.0007482175,0.000026739941,0.00057034276,0.001026904,0.00007720558,0.023454819],"genre_scores_gemma":[0.9816877,0.00007286347,0.017235843,0.000025586196,0.00000809659,0.0003746152,0.00034709641,0.000009303356,0.00023885613],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98616564,0.008947541,0.0012880379,0.00051943806,0.0026689821,0.0004104039],"domain_scores_gemma":[0.95309365,0.025367733,0.007864068,0.002283462,0.010605411,0.00078567135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016190646,0.00044577496,0.00041314473,0.00870749,0.0011686644,0.003023366,0.0003992047,0.0003553522,0.0016909788],"category_scores_gemma":[0.04759658,0.00021159282,0.0007652055,0.0058415057,0.0012858926,0.0034591097,0.0026140893,0.0006045621,0.00018838368],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054796063,0.0003438499,0.6241821,0.0009510158,0.00042827925,0.0003205428,0.055400115,0.009482599,0.0052562044,0.049700577,0.002813276,0.25057346],"study_design_scores_gemma":[0.000048822563,0.00086380914,0.7300493,0.0006366166,0.00015232096,0.00054605695,0.13463622,0.051237926,0.003394283,0.059845537,0.018280443,0.0003086505],"about_ca_topic_score_codex":0.0019973475,"about_ca_topic_score_gemma":0.0024304898,"teacher_disagreement_score":0.016190646,"about_ca_system_score_codex":0.0020223851,"about_ca_system_score_gemma":0.0012553446,"threshold_uncertainty_score":0.08562535},"labels":[],"label_agreement":null},{"id":"W6903038045","doi":"10.7939/r3-b8ym-e451","title":"ECI Impacts on Reducing the Causes of Disputes in Construction Projects","year":2023,"lang":"en","type":"dissertation","venue":"University of Alberta Library","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Constructability; Context (archaeology); Work (physics); Integrated project delivery; Construction industry; Key (lock)","score_opus":0.03948141361109881,"score_gpt":0.2805811614557448,"score_spread":0.241099747844646,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6903038045","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6989585,0.0025362624,0.027348753,0.009080678,0.00035845692,0.0013869131,0.00023568932,0.00046698275,0.25962773],"genre_scores_gemma":[0.9829996,0.0007217013,0.009231996,0.0004476872,0.000047978298,0.0002899984,0.00013784549,0.00006835035,0.0060548973],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.94440866,0.023220718,0.0028755034,0.0022671467,0.02138581,0.0058421856],"domain_scores_gemma":[0.9035182,0.038883463,0.014782781,0.0081637725,0.025578886,0.009072966],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.035793923,0.0007974348,0.0005871206,0.004383681,0.0053668763,0.009483711,0.002786649,0.0025238083,0.01051462],"category_scores_gemma":[0.08543463,0.0004929888,0.00094183005,0.004133287,0.003580335,0.005806087,0.010609809,0.0032042633,0.0012211255],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005862192,0.0025653057,0.15573466,0.0025757316,0.00024796886,0.0031110882,0.06320105,0.015360739,0.004937532,0.09348493,0.018269436,0.6399253],"study_design_scores_gemma":[0.00019451705,0.0026630496,0.34633738,0.0041901884,0.0005193616,0.001862535,0.30604503,0.025476258,0.0072676847,0.05449438,0.25050527,0.00044437798],"about_ca_topic_score_codex":0.005710487,"about_ca_topic_score_gemma":0.0060096965,"teacher_disagreement_score":0.035793923,"about_ca_system_score_codex":0.0075646373,"about_ca_system_score_gemma":0.014262043,"threshold_uncertainty_score":0.18929857},"labels":[],"label_agreement":null},{"id":"W6911154050","doi":"10.5281/zenodo.10463342","title":"Analyzing Project Delivery Delays in Riyadh, Saudi Arabia: A Government Perspective","year":2023,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Government (linguistics); Perspective (graphical); Productivity; Integrated project delivery; Ranking (information retrieval); Public sector","score_opus":0.10015482471350408,"score_gpt":0.3326048765382545,"score_spread":0.23245005182475043,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6911154050","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99742943,0.00023537602,0.0004360653,0.00014473105,0.0000028563898,0.000016556356,0.0003000991,0.0000061215833,0.0014287562],"genre_scores_gemma":[0.9989967,0.0001497809,0.0003082574,0.000008304619,0.000002271654,0.0000070272727,0.00015713528,0.0000020243408,0.00036853424],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9988164,0.00032239105,0.00009586596,0.00009155379,0.00032059528,0.0003532451],"domain_scores_gemma":[0.9893182,0.004133427,0.002787934,0.00018738718,0.0030845802,0.00048845407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017284714,0.00030375546,0.00028826107,0.0027121142,0.0005197057,0.0013954585,0.00047091438,0.00046102342,0.0016266583],"category_scores_gemma":[0.0057994244,0.00017893495,0.00024717182,0.0033290982,0.0003533035,0.00057035184,0.00069911295,0.00044232726,0.00023873782],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008319799,0.00030011707,0.8295771,0.00035742272,0.00025024023,0.0014831858,0.0043874634,0.095500484,0.0032927387,0.0071812836,0.0019875434,0.054850437],"study_design_scores_gemma":[0.000030168498,0.00054665585,0.86745405,0.000112546295,0.00014429803,0.0004109296,0.03509764,0.081899874,0.0045858147,0.0012559488,0.008385651,0.00007647344],"about_ca_topic_score_codex":0.16365483,"about_ca_topic_score_gemma":0.10727176,"teacher_disagreement_score":0.16365483,"about_ca_system_score_codex":0.006796534,"about_ca_system_score_gemma":0.0030859297,"threshold_uncertainty_score":0.32540452},"labels":[],"label_agreement":null},{"id":"W6920850650","doi":"10.6084/m9.figshare.13142737","title":"Integrated construction supply chain: an optimal decision-making model with third-party logistics partnership","year":2020,"lang":"en","type":"article","venue":"Figshare","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Supply chain; General partnership; Order (exchange); Supply chain management; Construction management; Materials management","score_opus":0.20080838668902903,"score_gpt":0.3659031255051417,"score_spread":0.16509473881611267,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6920850650","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2418428,0.0013221855,0.6775193,0.0025834148,0.00022143757,0.00059384067,0.0017850347,0.00039920886,0.073732734],"genre_scores_gemma":[0.9450795,0.0006224391,0.039145842,0.00010676153,0.00003380941,0.00046496303,0.0003896711,0.00003599364,0.014120956],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986461,0.000562744,0.000053333337,0.00026680992,0.00017949742,0.00029157015],"domain_scores_gemma":[0.9982173,0.0010225837,0.00022269633,0.000060243638,0.00028718222,0.00019007362],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002171529,0.0014206661,0.0015714512,0.0011959078,0.0012332422,0.0038086984,0.0022705812,0.0035188175,0.010211396],"category_scores_gemma":[0.0033947679,0.0011000072,0.0020528017,0.0017425597,0.0014397858,0.0019471572,0.0023770004,0.002319347,0.0009129103],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052500716,0.000038537884,0.00049233274,0.000030352558,0.000023480221,0.000105523286,0.000057474972,0.9858562,0.00012934521,0.011132543,0.0002196473,0.0018620809],"study_design_scores_gemma":[0.000022540824,0.000028654888,0.00013812803,0.000009525517,0.000015641905,0.000011723493,0.00004132995,0.99440104,0.00005260247,0.0047822576,0.00048622407,0.000010384459],"about_ca_topic_score_codex":0.034775425,"about_ca_topic_score_gemma":0.017924579,"teacher_disagreement_score":0.034775425,"about_ca_system_score_codex":0.003897915,"about_ca_system_score_gemma":0.0036557887,"threshold_uncertainty_score":0.06914604},"labels":[],"label_agreement":null},{"id":"W6922817162","doi":"10.13140/rg.2.2.36545.97124","title":"Building Information Modeling in Canadian Public-Private-Partnership Projects","year":2016,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Information system; Information model; Key (lock); Work (physics); Building information modeling; Information technology","score_opus":0.19418720603858217,"score_gpt":0.3593341207220067,"score_spread":0.16514691468342454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6922817162","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9376413,0.0008373259,0.022638842,0.0023713498,0.000026768017,0.00014993182,0.001926565,0.0001785361,0.0342295],"genre_scores_gemma":[0.98908293,0.00030482287,0.004699682,0.000030836996,0.0000036984336,0.000039937866,0.0005707274,0.000032289354,0.005235225],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9980545,0.00059890054,0.00007767001,0.0001908119,0.0004720587,0.00060597464],"domain_scores_gemma":[0.99515945,0.0030947102,0.00018436907,0.00018322517,0.001097069,0.0002812006],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033690198,0.00062016485,0.00078289956,0.001755119,0.0027607123,0.005142599,0.0025053667,0.0016831437,0.004306313],"category_scores_gemma":[0.011360601,0.0006308023,0.0010047005,0.004835232,0.0014169444,0.0019248181,0.0012452921,0.0011495781,0.0002817218],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010794356,0.000089099536,0.016584383,0.0000619896,0.00003273178,0.000105151936,0.00085307,0.9329221,0.00017672135,0.031010715,0.001903286,0.016152808],"study_design_scores_gemma":[0.000009519615,0.000014442425,0.007066168,0.000026873504,0.000025644027,0.000012363715,0.001228693,0.98373955,0.00021642567,0.004729893,0.0029027592,0.000027650905],"about_ca_topic_score_codex":0.9838845,"about_ca_topic_score_gemma":0.9848341,"teacher_disagreement_score":0.05148485,"about_ca_system_score_codex":0.05148485,"about_ca_system_score_gemma":0.0413655,"threshold_uncertainty_score":0.37355047},"labels":[],"label_agreement":null},{"id":"W6924387848","doi":"10.15468/dl.qtuu77","title":"Occurrence Download","year":2023,"lang":"en","type":"dataset","venue":"Global Biodiversity Information Facility","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Download; Matching (statistics); Range (aeronautics); Confidentiality","score_opus":0.06428543746391621,"score_gpt":0.3064850841960351,"score_spread":0.24219964673211888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6924387848","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000049410988,0.000027207745,0.000054813805,0.000038427,0.000011376606,0.000005586147,0.9987418,0.00042049354,0.0006509804],"genre_scores_gemma":[0.00019344977,0.000034545217,0.00023349054,0.000042915573,0.0000035053756,0.000046645364,0.9988426,0.00015670403,0.00044610925],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990103,0.00014017806,0.00013213772,0.0003268582,0.00023545655,0.00015498609],"domain_scores_gemma":[0.9976839,0.0006811198,0.00019686302,0.00058360916,0.0006245048,0.00023000588],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00093073805,0.0018128797,0.001455347,0.0049717473,0.0009925923,0.0025114717,0.002677399,0.0020150123,0.1470144],"category_scores_gemma":[0.006099033,0.0008590847,0.0011710135,0.009907241,0.00044661755,0.002101839,0.0022867976,0.001925554,0.20364879],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028168379,0.0000117320515,0.00040479863,0.00048228324,0.000014167692,0.000016105516,0.000024374513,0.00014544051,0.000110421206,0.00040228636,0.99679667,0.0015634964],"study_design_scores_gemma":[0.00007725484,0.000007629966,0.0019201664,0.00019229527,0.000013990812,0.000039286577,0.00008766728,0.00019916297,0.00019751114,0.0008782975,0.9963684,0.000018423929],"about_ca_topic_score_codex":0.022941709,"about_ca_topic_score_gemma":0.037068073,"teacher_disagreement_score":0.8529856,"about_ca_system_score_codex":0.0015601981,"about_ca_system_score_gemma":0.0022758262,"threshold_uncertainty_score":0.49181217},"labels":[],"label_agreement":null},{"id":"W6925783910","doi":"10.18739/a2mg7fw9m","title":"Discrete water samples collected from the Conductivity-Temperature-Depth rosette at specific depths, Northern Bering Sea to Chukchi Sea, 2018","year":2021,"lang":"en","type":"dataset","venue":"UC Santa Barbara","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Fisheries and Oceans Canada","funders":"","keywords":"Sea ice; Arctic ice pack; Cryosphere; Arctic; Spring (device); Antarctic sea ice; Plankton; Drift ice; Arctic sea ice decline","score_opus":0.06775618336672042,"score_gpt":0.3137431345163721,"score_spread":0.2459869511496517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6925783910","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00796326,0.000029356552,0.000088451,0.000031720214,0.000011755321,0.000048125345,0.9909039,0.00005557321,0.0008677967],"genre_scores_gemma":[0.007197777,0.000032268515,0.00042114686,0.000028872037,0.000003844908,0.00024884043,0.9901108,0.0000148947,0.0019416518],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999632,0.000033652756,0.00004535613,0.00013468192,0.000069903974,0.00008429553],"domain_scores_gemma":[0.9991918,0.00008378556,0.000115056275,0.00013181633,0.00038554668,0.000091890564],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005306193,0.0008955043,0.00054078526,0.0012881787,0.0007687012,0.00073256413,0.0010470274,0.0005296857,0.010854841],"category_scores_gemma":[0.0011410791,0.0003511183,0.00033431684,0.0035378914,0.00028163235,0.00026973544,0.0007625529,0.0004869753,0.00840813],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005710865,0.00017882195,0.113722526,0.0012263857,0.00015739934,0.00026178957,0.0005177899,0.0014490734,0.0017555449,0.00067675736,0.85504526,0.024437532],"study_design_scores_gemma":[0.00023846346,0.000065125794,0.5662023,0.00039021776,0.00007279781,0.000093087634,0.0012419332,0.0014607519,0.001374185,0.00027765636,0.42852774,0.00005573581],"about_ca_topic_score_codex":0.23833358,"about_ca_topic_score_gemma":0.38066778,"teacher_disagreement_score":0.23833358,"about_ca_system_score_codex":0.0015117042,"about_ca_system_score_gemma":0.0027426537,"threshold_uncertainty_score":0.47389263},"labels":[],"label_agreement":null},{"id":"W6939421048","doi":"10.6084/m9.figshare.12386468.v1","title":"Additional file 3 of Meeting the challenges posed by per diem in development projects in southern countries: a scoping review","year":2020,"lang":"en","type":"article","venue":"Figshare","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; Université du Québec en Abitibi-Témiscamingue","funders":"","keywords":"Government (linguistics); Work (physics); Data collection","score_opus":0.2014909114078238,"score_gpt":0.34495677349697834,"score_spread":0.14346586208915454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6939421048","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00027675575,0.00007816653,0.00020918172,0.00040093507,0.000055209384,0.000979914,0.99547464,0.0001551525,0.002370047],"genre_scores_gemma":[0.017633412,0.0013279526,0.008958883,0.0021621792,0.0003203114,0.050661683,0.87916297,0.0006805338,0.03909202],"study_design_codex":"not_applicable","study_design_gemma":"systematic_review","domain_scores_codex":[0.99824893,0.00041002972,0.0005749726,0.00018156771,0.00040668173,0.00017787682],"domain_scores_gemma":[0.93560725,0.047857422,0.0042271498,0.0013019178,0.010294681,0.0007115684],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0047094678,0.0008942875,0.0013464553,0.005295014,0.00090913306,0.0019241461,0.0015382005,0.0013557832,0.8462376],"category_scores_gemma":[0.058885124,0.00057923316,0.0012376314,0.008685087,0.0002908494,0.0028045105,0.001340593,0.0008178265,0.06596617],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039823097,0.00006901045,0.0013334082,0.02666298,0.00006453157,0.00007830826,0.0001851771,0.00031721444,0.000068907,0.0011581819,0.95783216,0.011831889],"study_design_scores_gemma":[0.006147664,0.0003259075,0.028802015,0.03327495,0.00042979172,0.0002990818,0.0017040346,0.0011727551,0.00050419854,0.008076579,0.9190997,0.00016328688],"about_ca_topic_score_codex":0.012510095,"about_ca_topic_score_gemma":0.021919653,"teacher_disagreement_score":0.8462376,"about_ca_system_score_codex":0.00286987,"about_ca_system_score_gemma":0.0053462647,"threshold_uncertainty_score":0.2193234},"labels":[],"label_agreement":null},{"id":"W6939442091","doi":"10.6084/m9.figshare.12085212.v1","title":"Additional file 1 of DNA methylation age calculators reveal association with diabetic neuropathy in type 1 diabetes","year":2020,"lang":"en","type":"article","venue":"Figshare","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; McMaster University; SickKids Foundation; Hospital for Sick Children","funders":"","keywords":"Type 1 diabetes; DNA methylation; Diabetes mellitus; Diabetic neuropathy; Association (psychology); Peripheral neuropathy","score_opus":0.06523972700515826,"score_gpt":0.28163665183552017,"score_spread":0.2163969248303619,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6939442091","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0004417877,0.000025447927,0.000274271,0.00014308434,0.000023030268,0.00006177973,0.9980634,0.00019549478,0.0007717331],"genre_scores_gemma":[0.030151945,0.00029223744,0.0071411645,0.0010973572,0.00020655674,0.0030528796,0.93991977,0.0012952774,0.016842866],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.99905103,0.00022463493,0.00016467889,0.0002458749,0.00016623628,0.00014748267],"domain_scores_gemma":[0.966942,0.02755271,0.0015335492,0.0014105873,0.0019249758,0.0006361123],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0017848883,0.0010355825,0.0011343348,0.002212443,0.0009614822,0.0016057495,0.0019393712,0.0014480905,0.8580156],"category_scores_gemma":[0.04102415,0.0006349585,0.0013432314,0.0038510642,0.00030149004,0.0016585932,0.0009446303,0.0009728288,0.11979377],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005377945,0.00011490862,0.009496666,0.0025931436,0.000117282754,0.00014992469,0.000110444584,0.0005030978,0.00010135884,0.00075745763,0.9743552,0.011162719],"study_design_scores_gemma":[0.013711205,0.00068969285,0.1401055,0.008667153,0.0009989389,0.0025459388,0.0014816152,0.0050240937,0.0016413567,0.025173433,0.7995564,0.00040471554],"about_ca_topic_score_codex":0.010310583,"about_ca_topic_score_gemma":0.014005088,"teacher_disagreement_score":0.8580156,"about_ca_system_score_codex":0.00078281004,"about_ca_system_score_gemma":0.0015330783,"threshold_uncertainty_score":0.20252353},"labels":[],"label_agreement":null},{"id":"W6962941187","doi":"10.1594/pangaea.946919","title":"Abundance of epibenthic fauna on a Deep-Sea Cliff offshore Greenland and the Associated Epibenthic Fauna","year":2021,"lang":"en","type":"dataset","venue":"Publishing Network for Geoscientific and Environmental Data (PANGAEA) (Alfred Wegener Institute for Polar and Marine Research)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Horizon 2020; Natural Environment Research Council","keywords":"Fauna; Abundance (ecology); Submarine pipeline; Cliff; Terrain; Abiotic component; Benthos; Benthic zone","score_opus":0.12371372181451863,"score_gpt":0.3480003489802508,"score_spread":0.22428662716573217,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6962941187","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0004534795,0.000028534809,0.000032992702,0.000023676455,0.0000082116785,0.000007077054,0.99907374,0.000069832495,0.0003024001],"genre_scores_gemma":[0.0007356522,0.00002349981,0.00020681028,0.000014153325,0.0000024736255,0.000052644635,0.99855596,0.000022372646,0.00038643382],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9993444,0.00007735188,0.00007148608,0.00023868335,0.00013610133,0.00013207179],"domain_scores_gemma":[0.9985493,0.00031784677,0.00019482893,0.00026511468,0.0004947909,0.00017805307],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011343808,0.001537344,0.0012663625,0.0041497005,0.00080490386,0.0017256778,0.002313224,0.0014482257,0.035640042],"category_scores_gemma":[0.003005033,0.0005368523,0.0008416806,0.006109222,0.00045736128,0.00090398325,0.0019114992,0.0014168075,0.038977917],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000097797754,0.0000413711,0.0067076525,0.0011622547,0.00006882546,0.00006013905,0.00011854674,0.00044559257,0.0003162522,0.000580388,0.98599225,0.0044089314],"study_design_scores_gemma":[0.0002919571,0.000027370172,0.05284288,0.00073040364,0.000082011094,0.0001455913,0.00045658826,0.0008102978,0.0006649858,0.0011343918,0.9427527,0.000060711336],"about_ca_topic_score_codex":0.05586992,"about_ca_topic_score_gemma":0.13693377,"teacher_disagreement_score":0.05586992,"about_ca_system_score_codex":0.0017689797,"about_ca_system_score_gemma":0.0021206692,"threshold_uncertainty_score":0.11922777},"labels":[],"label_agreement":null},{"id":"W6977340436","doi":"10.6084/m9.figshare.19470472.v1","title":"Additional file 2 of Increased risk of mortality in systemic sclerosis-associated pulmonary hypertension: a systemic review and meta-analysis","year":2022,"lang":"en","type":"article","venue":"Figshare","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cohort; Cohort study; Quality (philosophy); Scale (ratio); Risk assessment","score_opus":0.21207429287937643,"score_gpt":0.31862957865246677,"score_spread":0.10655528577309034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6977340436","genre_codex":"dataset","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00037128825,0.00031127676,0.00032664614,0.0001992783,0.000040662602,0.00043711183,0.997517,0.00014324774,0.0006534679],"genre_scores_gemma":[0.037492238,0.0024888117,0.014991901,0.0028573223,0.0005269676,0.036607563,0.8773025,0.0011133869,0.026619272],"study_design_codex":"not_applicable","study_design_gemma":"meta_analysis","domain_scores_codex":[0.9980603,0.00045852043,0.0005712488,0.00038447024,0.00032316768,0.00020237826],"domain_scores_gemma":[0.9544345,0.037476234,0.0038064383,0.0010811677,0.0027490067,0.00045271986],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0039338954,0.0013456829,0.0028297794,0.0041778693,0.00067374826,0.0019607432,0.0018580845,0.0014917268,0.8353829],"category_scores_gemma":[0.05695267,0.00087078504,0.003880657,0.006802585,0.00032657868,0.00258942,0.0014245842,0.0010201018,0.041827645],"study_design_candidate":"meta_analysis","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0026323402,0.0001928538,0.0056866272,0.27269658,0.0027281546,0.00021972043,0.00023571977,0.0014595521,0.00036561603,0.0027273067,0.69191676,0.01913878],"study_design_scores_gemma":[0.05876543,0.0014337162,0.07345476,0.093772426,0.016384296,0.0014410334,0.00088684884,0.0054710247,0.0015804754,0.027533052,0.7187064,0.00057044515],"about_ca_topic_score_codex":0.0054713446,"about_ca_topic_score_gemma":0.011641516,"teacher_disagreement_score":0.8353829,"about_ca_system_score_codex":0.0014203084,"about_ca_system_score_gemma":0.002688466,"threshold_uncertainty_score":0.23480636},"labels":[],"label_agreement":null},{"id":"W6981650036","doi":"","title":"Étude exploratoire au sein de quatre institutions financières au Canada sur les bureaux de projet et le management du savoir : une perspective intégrative","year":2006,"lang":"fr","type":"other","venue":"Archipelago (Université du Québec à Montréal)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Université du Québec à Montréal","keywords":"Context (archaeology); Capital (architecture); Perspective (graphical); Ile de france","score_opus":0.026442846691797743,"score_gpt":0.23573333705932362,"score_spread":0.20929049036752587,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6981650036","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8470837,0.006262673,0.004842609,0.009760529,0.000089990564,0.00014052111,0.00046659782,0.000081388986,0.13127199],"genre_scores_gemma":[0.96081823,0.0028030765,0.0022540854,0.000328163,0.000011056474,0.000035543897,0.00011511555,0.000021843209,0.033612844],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9983822,0.00026152882,0.000033048032,0.00014987975,0.00056314224,0.00061013165],"domain_scores_gemma":[0.99763834,0.00053017144,0.0003345223,0.00007088631,0.00086830975,0.0005577512],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015131508,0.0003420421,0.00037256506,0.002210529,0.010397858,0.0109557165,0.00093676377,0.0010236079,0.006595737],"category_scores_gemma":[0.0026098955,0.00031463677,0.00033142362,0.0057571204,0.0052745296,0.0023807655,0.0023642618,0.0013337637,0.00025368092],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016358787,0.00013716111,0.15329498,0.00055654714,0.0001187805,0.0039038437,0.24649587,0.004769122,0.0041149864,0.4635234,0.012202492,0.11071931],"study_design_scores_gemma":[0.000024359093,0.0000840895,0.3015786,0.0011308677,0.000135035,0.00045606558,0.3517116,0.004239034,0.0015043197,0.016485574,0.32251653,0.00013403886],"about_ca_topic_score_codex":0.97530955,"about_ca_topic_score_gemma":0.9866941,"teacher_disagreement_score":0.072293036,"about_ca_system_score_codex":0.072293036,"about_ca_system_score_gemma":0.1364694,"threshold_uncertainty_score":0.52452517},"labels":[],"label_agreement":null},{"id":"W6981867222","doi":"","title":"First sheld-on conference meeting. Proceedings of the first COST Action CA16226 Conference Meeting Riga, Latvia, 10 October 2018","year":2018,"lang":"en","type":"book","venue":"Nottingham Trent University's Institutional Repository (Nottingham Trent Repository)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Agencia Estatal de Investigación; Fundação para a Ciência e a Tecnologia; Horizon 2020 Framework Programme; European Commission; Xunta de Galicia; Vetenskapsrådet; Canadian Institutes of Health Research; Ministero dell’Istruzione, dell’Università e della Ricerca; Joint Programming Initiative More Years, Better Lives","keywords":"Action (physics); Work (physics); Cost analysis; Government (linguistics)","score_opus":0.06158763716759791,"score_gpt":0.27388227260105324,"score_spread":0.21229463543345534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6981867222","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00079311884,0.0045440383,0.00062561856,0.003117085,0.0055401814,0.00012653635,0.0048071546,0.00047388428,0.9799724],"genre_scores_gemma":[0.00083497906,0.00055464776,0.00013615264,0.000111637164,0.00012090673,0.000028356937,0.00081507734,0.0001453652,0.9972529],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993224,0.00006367848,0.000024812027,0.00007850745,0.00037928438,0.0001313623],"domain_scores_gemma":[0.9990922,0.00011260702,0.00003843506,0.00007072877,0.00043645746,0.00024944532],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00082861196,0.0009414263,0.0007531497,0.0015196566,0.002067064,0.0051417574,0.0013010876,0.0019265172,0.644653],"category_scores_gemma":[0.0018457376,0.0005302681,0.0005198043,0.001909429,0.0004558014,0.0024402763,0.0019107995,0.0015565938,0.4215278],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034313114,0.000018671768,0.000075576114,0.00009465782,0.0000015573518,0.000024584808,0.000055461187,0.000032871263,0.00011194625,0.0008450388,0.962785,0.03592035],"study_design_scores_gemma":[0.0000045778374,0.0000098222345,0.00040436973,0.000059125483,0.000001228356,0.000015595007,0.00006588048,0.000018326164,0.000049662034,0.00024038604,0.9991278,0.0000031781988],"about_ca_topic_score_codex":0.019927163,"about_ca_topic_score_gemma":0.11248896,"teacher_disagreement_score":0.644653,"about_ca_system_score_codex":0.0024355089,"about_ca_system_score_gemma":0.004340111,"threshold_uncertainty_score":0.5068593},"labels":[],"label_agreement":null},{"id":"W6987164974","doi":"","title":"Significant technical changes in the 2010 National Model Construction Codes","year":2010,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Field (mathematics); Key (lock); Code (set theory); Process (computing); Production (economics)","score_opus":0.09571321545625071,"score_gpt":0.3592564976410561,"score_spread":0.2635432821848054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6987164974","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4438466,0.0013025086,0.35084647,0.018278977,0.0034317286,0.0014472767,0.008489885,0.0043469556,0.16800955],"genre_scores_gemma":[0.5930299,0.0010535696,0.30805343,0.0023257048,0.00030647832,0.0011520026,0.006554121,0.0014111092,0.086113654],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98036236,0.0036798131,0.0016895072,0.0017820924,0.011256116,0.0012299599],"domain_scores_gemma":[0.9473758,0.0099872425,0.0028209614,0.010090558,0.028703116,0.0010223425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012660515,0.000778682,0.00048917235,0.002565951,0.0021230935,0.004685097,0.0022765885,0.0016996274,0.007744888],"category_scores_gemma":[0.052210055,0.00079517125,0.0015519919,0.003589294,0.0016640351,0.002200977,0.0018450471,0.0033427593,0.0028300136],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051594106,0.0006801115,0.040030576,0.000681945,0.00014128214,0.00044730084,0.004146417,0.092396125,0.025302777,0.22116351,0.056066215,0.5584278],"study_design_scores_gemma":[0.00017707769,0.0007773495,0.079086885,0.0008494705,0.00017046815,0.0008506581,0.0028645336,0.105831854,0.02757347,0.020831868,0.7605465,0.00043986095],"about_ca_topic_score_codex":0.28700837,"about_ca_topic_score_gemma":0.23400491,"teacher_disagreement_score":0.28700837,"about_ca_system_score_codex":0.018849455,"about_ca_system_score_gemma":0.034311924,"threshold_uncertainty_score":0.5706756},"labels":[],"label_agreement":null},{"id":"W6989884862","doi":"","title":"Changes to the 2010 National Model Construction Codes","year":2011,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building code; Code (set theory); Ventilation (architecture); Key (lock); Field (mathematics)","score_opus":0.21765104260937235,"score_gpt":0.353813926880125,"score_spread":0.13616288427075263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989884862","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.082039215,0.0023796542,0.08111553,0.11482738,0.033158995,0.0014505598,0.014334098,0.004037963,0.66665655],"genre_scores_gemma":[0.24319148,0.0030666492,0.180832,0.0702529,0.0023794288,0.00317446,0.025429053,0.0016366087,0.47003734],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.95646286,0.0039123427,0.0026992823,0.0020549092,0.031906057,0.0029645858],"domain_scores_gemma":[0.9401336,0.0056306613,0.0021829351,0.0044258917,0.045705456,0.0019213933],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01245557,0.00073408586,0.00057554187,0.0025446957,0.0027129645,0.004400261,0.003912446,0.0040844353,0.008643986],"category_scores_gemma":[0.06006168,0.0007693318,0.0016399682,0.0028272965,0.001675105,0.0021969196,0.0021484983,0.0078003807,0.0048760166],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024256037,0.00043380467,0.008703815,0.00027648665,0.00003257846,0.00021244229,0.0013548448,0.008015161,0.0031851593,0.2267104,0.62292385,0.12790881],"study_design_scores_gemma":[0.00002380188,0.000064801614,0.0077964845,0.00025327926,0.000015665742,0.00014894019,0.0003765064,0.001963717,0.00090870186,0.004391679,0.98398614,0.0000702672],"about_ca_topic_score_codex":0.29998648,"about_ca_topic_score_gemma":0.33669475,"teacher_disagreement_score":0.29998648,"about_ca_system_score_codex":0.028739663,"about_ca_system_score_gemma":0.055099003,"threshold_uncertainty_score":0.5964807},"labels":[],"label_agreement":null},{"id":"W6990038395","doi":"","title":"Contractual incentives between the main contractor and third parties for better performance in a Bouwteam","year":2023,"lang":"en","type":"dissertation","venue":"Research Repository (Delft University of Technology)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canadian Pulmonary Fibrosis Foundation","keywords":"Nucleofection; Gestational period; Hyporeflexia; TSG101; Fusible alloy; Hyperlactatemia; Demotion","score_opus":0.08458153701353631,"score_gpt":0.36764838244410564,"score_spread":0.2830668454305693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6990038395","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25169083,0.0015110283,0.32112813,0.010082078,0.0004229557,0.0019789357,0.000081400874,0.00020248146,0.41290218],"genre_scores_gemma":[0.889391,0.000653625,0.07758065,0.0005250723,0.00010182145,0.000895975,0.00005103953,0.00006796291,0.030732868],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.96520996,0.019115647,0.0014539361,0.0021352866,0.008656959,0.0034283076],"domain_scores_gemma":[0.97695595,0.011256075,0.0033538593,0.0027275344,0.0031212254,0.0025854085],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.033520177,0.000680306,0.0005514938,0.0015955558,0.003908184,0.009571022,0.0017959337,0.0027407974,0.011538626],"category_scores_gemma":[0.04126627,0.00074369967,0.0006382488,0.0020134172,0.0051507433,0.0071748025,0.008163512,0.0038047943,0.0016911937],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022924882,0.00064745196,0.0055507966,0.00019166846,0.000040345945,0.00028759948,0.006430375,0.009666065,0.0037282957,0.86304307,0.0039123693,0.106272735],"study_design_scores_gemma":[0.00038916335,0.0011567962,0.02032261,0.0021075364,0.00011790652,0.0006779897,0.012653632,0.061730415,0.008087453,0.5866016,0.30582878,0.00032610688],"about_ca_topic_score_codex":0.0032793228,"about_ca_topic_score_gemma":0.0038318262,"teacher_disagreement_score":0.033520177,"about_ca_system_score_codex":0.00594201,"about_ca_system_score_gemma":0.013289416,"threshold_uncertainty_score":0.17727375},"labels":[],"label_agreement":null},{"id":"W6991486408","doi":"","title":"Have your say in the national construction codes","year":2007,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Code (set theory); Government (linguistics); Field (mathematics); Exposition (narrative)","score_opus":0.12860639950137046,"score_gpt":0.3996104236875201,"score_spread":0.27100402418614966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6991486408","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040527027,0.004872951,0.011341486,0.7608022,0.020189129,0.000050091236,0.0006593156,0.00012789488,0.16142996],"genre_scores_gemma":[0.64256316,0.004800025,0.020085908,0.13910909,0.004354484,0.00024908222,0.00089811796,0.00063781196,0.18730232],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9896035,0.003915258,0.0006436347,0.0010487207,0.0035393154,0.0012494468],"domain_scores_gemma":[0.9573961,0.017297836,0.0025240025,0.0029852032,0.017257074,0.0025397008],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013155288,0.00031923375,0.0005814883,0.0014516736,0.008499714,0.011100448,0.0013430914,0.008723062,0.010973075],"category_scores_gemma":[0.070832424,0.00039842093,0.0005447268,0.0032039282,0.009526512,0.010074942,0.0037633197,0.011100343,0.002337054],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000795002,0.000030740157,0.0076253293,0.00014104728,0.000019019313,0.00023090877,0.021614898,0.0004148701,0.0004013069,0.7062417,0.21791352,0.045287095],"study_design_scores_gemma":[0.000010052701,0.000026430007,0.006672253,0.0005000516,0.000016812435,0.00012437075,0.021551404,0.0004143676,0.00045099878,0.05574536,0.9144118,0.000076066135],"about_ca_topic_score_codex":0.19968152,"about_ca_topic_score_gemma":0.26494798,"teacher_disagreement_score":0.19968152,"about_ca_system_score_codex":0.008587475,"about_ca_system_score_gemma":0.016252764,"threshold_uncertainty_score":0.39703846},"labels":[],"label_agreement":null},{"id":"W6991893304","doi":"","title":"International efforts to enhance innovation in the construction industry: what do they mean for Canada?","year":2005,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Work (physics); Public policy","score_opus":0.04269544383425361,"score_gpt":0.3546122263352257,"score_spread":0.3119167825009721,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6991893304","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14204355,0.072867416,0.001915896,0.5308099,0.0019460159,0.00012945611,0.0013469609,0.00019697164,0.24874389],"genre_scores_gemma":[0.87469274,0.06727231,0.0035611466,0.02218463,0.0004535295,0.00009008306,0.0005539996,0.00011114409,0.031080347],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99113536,0.00079499756,0.00021130488,0.00036714855,0.003770608,0.0037205874],"domain_scores_gemma":[0.9746507,0.0025713556,0.0016074742,0.0004311188,0.013353285,0.0073860823],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0060344087,0.00085510913,0.0008872092,0.003127831,0.0088115,0.015452045,0.0014307697,0.0031693322,0.010364322],"category_scores_gemma":[0.018190965,0.00029526802,0.0008809302,0.0071505136,0.007553158,0.0048743696,0.0043854564,0.004784736,0.0006309851],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034025367,0.0005149737,0.10834358,0.0019652317,0.00030257076,0.00035816865,0.014516881,0.002173671,0.0007262924,0.30853692,0.137131,0.42509052],"study_design_scores_gemma":[0.00012257029,0.00025050115,0.29379028,0.005534708,0.00074465916,0.00025801526,0.07632517,0.0017817235,0.002128289,0.026654204,0.5920712,0.00033867068],"about_ca_topic_score_codex":0.97542065,"about_ca_topic_score_gemma":0.98962444,"teacher_disagreement_score":0.89763737,"about_ca_system_score_codex":0.10236261,"about_ca_system_score_gemma":0.2651929,"threshold_uncertainty_score":0.74269617},"labels":[],"label_agreement":null},{"id":"W6991925973","doi":"","title":"International symposium tackles key issues of construction innovation","year":2001,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Key (lock); Information technology; Work (physics)","score_opus":0.06096683105571185,"score_gpt":0.3597141309793034,"score_spread":0.2987472999235915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6991925973","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014121783,0.2796637,0.021238655,0.21954452,0.051211473,0.00014507074,0.00030409286,0.0001477666,0.41362298],"genre_scores_gemma":[0.29399106,0.39765602,0.014832357,0.0168475,0.05174904,0.00029156668,0.00074502453,0.00013772884,0.22374964],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99757,0.000693993,0.00014936614,0.00019875934,0.0008912262,0.0004966897],"domain_scores_gemma":[0.99676657,0.0014282737,0.00024213652,0.0001272515,0.0007620018,0.0006737053],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040055653,0.00078023365,0.0008248181,0.0018900604,0.0019254807,0.007312401,0.00096648996,0.0042683883,0.019064885],"category_scores_gemma":[0.004652102,0.00020657093,0.0006522276,0.0023844843,0.0023099554,0.0035745862,0.0027264887,0.003563474,0.0030502642],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016055643,0.00021130765,0.0015488816,0.0013578678,0.000051991614,0.00042029776,0.0016744338,0.0025935946,0.0018966006,0.44750223,0.26162893,0.28095332],"study_design_scores_gemma":[0.0000065719164,0.00008431578,0.0007352467,0.0002635817,0.000013974049,0.00013890017,0.0009796532,0.0003445207,0.00036923395,0.029523032,0.96752375,0.000017164062],"about_ca_topic_score_codex":0.0011386242,"about_ca_topic_score_gemma":0.001767315,"teacher_disagreement_score":0.019064885,"about_ca_system_score_codex":0.0033624873,"about_ca_system_score_gemma":0.003833583,"threshold_uncertainty_score":0.06377834},"labels":[],"label_agreement":null},{"id":"W6999143750","doi":"","title":"The Canadian Construction Market 2014-2023: Outlook on Commercial, Industrial, Infrastructure, Energy &amp;amp;amp; Utilities, Institutional, and Residential Construction - ResearchAndMarkets.com","year":2019,"lang":"en","type":"other","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Energy (signal processing); Construction industry; Production (economics); Construction management; Efficient energy use","score_opus":0.10337422740373012,"score_gpt":0.33941818423179565,"score_spread":0.23604395682806553,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999143750","genre_codex":"dataset","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008452736,0.01571113,0.0016743338,0.036008775,0.0023172845,0.00023035456,0.5428341,0.0024773055,0.39029402],"genre_scores_gemma":[0.066201195,0.025470458,0.005584083,0.0040608877,0.00043328607,0.00021669068,0.27373552,0.0011569711,0.6231409],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9963876,0.00007868764,0.00005260838,0.00011124274,0.0026293003,0.00074063265],"domain_scores_gemma":[0.9926146,0.0001376102,0.00018005457,0.00006495486,0.0059198136,0.0010830075],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017185262,0.0019218241,0.0007274006,0.0057033165,0.0042230305,0.0054864744,0.0018149604,0.0018116366,0.09238651],"category_scores_gemma":[0.0042677987,0.0006343437,0.0011778005,0.012982998,0.00084467017,0.0020388647,0.0020986712,0.0017488103,0.023100963],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036295314,0.000012741157,0.0009911805,0.00013756409,0.000012591661,0.000024104333,0.000040158662,0.0003608554,0.00008347082,0.0042464165,0.9713122,0.022742404],"study_design_scores_gemma":[0.000022195307,0.0000134804295,0.02032514,0.00020724765,0.000021670963,0.000032523032,0.00042059185,0.0015096077,0.00040097538,0.001180436,0.975808,0.000058026864],"about_ca_topic_score_codex":0.9931772,"about_ca_topic_score_gemma":0.99524826,"teacher_disagreement_score":0.09238651,"about_ca_system_score_codex":0.07721693,"about_ca_system_score_gemma":0.18163978,"threshold_uncertainty_score":0.56025064},"labels":[],"label_agreement":null},{"id":"W7001776831","doi":"","title":"[Letter from R. C. S. Brown] Inclosing quarterly accounts for quarter ending 30th September 1848","year":2013,"lang":"en","type":"article","venue":"ThinkTech (Texas Tech University)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Period (music); Government (linguistics); Work (physics)","score_opus":0.042051107794550964,"score_gpt":0.2799655325869353,"score_spread":0.23791442479238434,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7001776831","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0037116474,0.0058505903,0.0005998416,0.68792623,0.041560218,0.000067574336,0.0010629339,0.00039217767,0.25882885],"genre_scores_gemma":[0.017628778,0.0013755516,0.00022144728,0.20386781,0.0058409395,0.00007216832,0.0002615723,0.00016014784,0.77057153],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990289,0.00017457799,0.000059442562,0.00014982445,0.00037597097,0.00021127022],"domain_scores_gemma":[0.99776566,0.00091468473,0.000114659124,0.000102820464,0.00092821516,0.00017391799],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012478478,0.00034618875,0.00046688656,0.0005738053,0.0064539458,0.0030770763,0.00086584984,0.01062798,0.0526468],"category_scores_gemma":[0.009001714,0.0005319047,0.00040012063,0.0008265266,0.0012152623,0.0019697226,0.00086888834,0.0077887457,0.029265445],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012225313,0.0000022434053,0.00008562286,0.000009746368,0.000001074027,0.00005082027,0.000073871655,0.0000059664953,0.000045900684,0.0026246058,0.9953962,0.0016916044],"study_design_scores_gemma":[0.000005358132,0.000007070927,0.00091210945,0.00004239216,0.0000019254044,0.000043268647,0.00021596166,0.00003060208,0.0001026477,0.001177624,0.9974504,0.000010600809],"about_ca_topic_score_codex":0.034840804,"about_ca_topic_score_gemma":0.06644203,"teacher_disagreement_score":0.0526468,"about_ca_system_score_codex":0.00195532,"about_ca_system_score_gemma":0.0023928154,"threshold_uncertainty_score":0.17612112},"labels":[],"label_agreement":null},{"id":"W7002426645","doi":"","title":"The NSCIC: towards a new era in construction","year":2003,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Guard (computer science); Industrial Revolution; Construction industry; Technological change","score_opus":0.06802697560113373,"score_gpt":0.34671053294858073,"score_spread":0.278683557347447,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7002426645","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022813158,0.042135715,0.033728752,0.28774533,0.0035084947,0.000078473124,0.00021084459,0.0004610961,0.609318],"genre_scores_gemma":[0.58929247,0.0987037,0.07354603,0.036194608,0.0044297967,0.00021962948,0.0006578337,0.00042356236,0.19653241],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99360704,0.0015248853,0.00015975517,0.00025531335,0.0039342614,0.00051875424],"domain_scores_gemma":[0.9939797,0.0014966857,0.00034475035,0.00043070456,0.0024342402,0.0013140021],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006930714,0.00035499295,0.0004551189,0.0020499495,0.0029382466,0.009097098,0.0013100535,0.0028470599,0.013575833],"category_scores_gemma":[0.00693648,0.00016444539,0.0002803176,0.0040083644,0.009233894,0.0068945144,0.0045395712,0.0039287736,0.0023132886],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004726561,0.00010322646,0.0020046441,0.00031584434,0.0000056246254,0.00010616513,0.002216066,0.0008033147,0.00040527378,0.6443794,0.10461414,0.24499899],"study_design_scores_gemma":[0.0000051782913,0.000035092664,0.0011495545,0.00029003018,0.000002976312,0.00009308173,0.002170362,0.0011206651,0.0002204147,0.060187403,0.9347137,0.000011469712],"about_ca_topic_score_codex":0.012235943,"about_ca_topic_score_gemma":0.02998668,"teacher_disagreement_score":0.013575833,"about_ca_system_score_codex":0.009684036,"about_ca_system_score_gemma":0.022917949,"threshold_uncertainty_score":0.07026297},"labels":[],"label_agreement":null},{"id":"W7002428652","doi":"","title":"2010 National Model Construction Codes","year":2011,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Key (lock); Code (set theory); Work (physics); National standard","score_opus":0.2181168549097448,"score_gpt":0.3552694008661585,"score_spread":0.13715254595641369,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7002428652","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03372359,0.0013300539,0.07542623,0.02017718,0.008121289,0.0013970626,0.027134914,0.0036044552,0.8290853],"genre_scores_gemma":[0.14865856,0.003529643,0.18801036,0.013232876,0.00078057346,0.0052037816,0.09059721,0.0019816663,0.54800534],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.97916037,0.0020740123,0.0014212168,0.0010983463,0.014426838,0.001819198],"domain_scores_gemma":[0.9616959,0.0019785073,0.0012522254,0.0031362637,0.030670458,0.0012666442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008510439,0.00088090845,0.0006213573,0.0037571394,0.002483453,0.0036638305,0.00291823,0.0025400342,0.017938124],"category_scores_gemma":[0.037032813,0.00072831236,0.0012791114,0.0041196467,0.0013197045,0.0024736808,0.0026937758,0.004823668,0.009644272],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020375806,0.00020665218,0.004592724,0.0002778063,0.000017425948,0.0001227733,0.00040406277,0.010173082,0.0015616706,0.20664155,0.6786035,0.09719499],"study_design_scores_gemma":[0.000025761696,0.000035938316,0.0041793133,0.00019423438,0.000012288582,0.000108027125,0.00020617426,0.003864354,0.00070151174,0.0054353913,0.9851849,0.00005206165],"about_ca_topic_score_codex":0.2475638,"about_ca_topic_score_gemma":0.25952673,"teacher_disagreement_score":0.2475638,"about_ca_system_score_codex":0.027338058,"about_ca_system_score_gemma":0.06775415,"threshold_uncertainty_score":0.4922456},"labels":[],"label_agreement":null},{"id":"W7008309534","doi":"","title":"British study foresees Canadian construction uptick in 2016","year":2016,"lang":"en","type":"other","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Statistician","score_opus":0.04767298593839318,"score_gpt":0.35341088835784323,"score_spread":0.30573790241945004,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008309534","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043087453,0.0047971252,0.0016639689,0.023286337,0.0031954437,0.00041853802,0.122981265,0.00070598326,0.7998638],"genre_scores_gemma":[0.05911157,0.0015707284,0.0009623419,0.0025499112,0.000107853884,0.00013010953,0.013964374,0.00024205688,0.921361],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99640936,0.00012987497,0.00010289704,0.000214136,0.0018015757,0.0013422417],"domain_scores_gemma":[0.9915991,0.00046958495,0.00020047971,0.00032589826,0.0060861926,0.0013187274],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002227227,0.00075625227,0.000604457,0.003678116,0.0071685147,0.005780915,0.0010908102,0.002316469,0.08515865],"category_scores_gemma":[0.006817446,0.0005572522,0.00075497205,0.0055374694,0.00097396126,0.0015265071,0.0020008057,0.002787448,0.011304402],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026037596,0.00006735959,0.014824059,0.00035214858,0.000026673406,0.00020556714,0.0012042095,0.0003817482,0.00028111873,0.023530362,0.8958573,0.06300908],"study_design_scores_gemma":[0.000010580522,0.0000126113555,0.048564844,0.00016284184,0.000013061863,0.000034400822,0.0018029376,0.00014227354,0.00029815882,0.0006134727,0.9483186,0.000026339023],"about_ca_topic_score_codex":0.9861432,"about_ca_topic_score_gemma":0.9969838,"teacher_disagreement_score":0.08515865,"about_ca_system_score_codex":0.041243855,"about_ca_system_score_gemma":0.102915704,"threshold_uncertainty_score":0.2992465},"labels":[],"label_agreement":null},{"id":"W7008746859","doi":"","title":"Consolidating the presence of EOS Project Management in Europe","year":2016,"lang":"en","type":"dissertation","venue":"Academica-e (Universidad Pública de Navarra)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Project management; Procurement; Workforce; Action plan; Project planning; Plan (archaeology); Action (physics); Workforce development; Market analysis","score_opus":0.05862878417853506,"score_gpt":0.3720702990301701,"score_spread":0.313441514851635,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008746859","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9127636,0.0021941029,0.0008427336,0.0033172695,0.00005505673,0.000015605565,0.000041992942,0.000008869797,0.08076079],"genre_scores_gemma":[0.99663013,0.00062920206,0.0003965757,0.00017370845,0.000014306723,0.0000050332555,0.000023955665,0.000003957892,0.0021231319],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99367505,0.0029359306,0.00025799542,0.0004408268,0.001269359,0.0014207629],"domain_scores_gemma":[0.99197185,0.0021050137,0.0016175311,0.0003383425,0.0017520583,0.002215204],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008144873,0.00013976303,0.00025431009,0.0013978339,0.0015484381,0.0058456054,0.00043764093,0.0005504001,0.001898039],"category_scores_gemma":[0.006835081,0.00014343318,0.00017308506,0.0021627694,0.0015867271,0.0017654115,0.002855528,0.00077199325,0.00017718622],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008629787,0.0006627284,0.3426751,0.0007096706,0.00014726784,0.0026249576,0.057514742,0.0025567506,0.0050468063,0.13824004,0.011772491,0.43718648],"study_design_scores_gemma":[0.000028930746,0.0003488844,0.69134784,0.0013210246,0.0000620773,0.0012089656,0.11685787,0.0015499269,0.0016823454,0.0073544257,0.17817818,0.000059493184],"about_ca_topic_score_codex":0.0056256033,"about_ca_topic_score_gemma":0.010234928,"teacher_disagreement_score":0.008144873,"about_ca_system_score_codex":0.003275938,"about_ca_system_score_gemma":0.0049300324,"threshold_uncertainty_score":0.043074727},"labels":[],"label_agreement":null},{"id":"W7010049739","doi":"","title":"Filling the Gap: Developing Knowledge Management (KM) Maturity Assessment Capability in OPM3 for IT Organizations in Pakistan","year":2015,"lang":"en","type":"dissertation","venue":"HEC National Digital Library","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Maturity (psychological); Competitive advantage; OPM3; Capability Maturity Model; Information technology; Project management; Organizational learning; Project management triangle","score_opus":0.08858295671797946,"score_gpt":0.426868624279197,"score_spread":0.33828566756121753,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7010049739","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9826034,0.0003709519,0.0006157612,0.0021494667,0.000014295243,0.0001272641,0.00015428811,0.000014819591,0.01394976],"genre_scores_gemma":[0.99681586,0.0002810748,0.0013921135,0.00013697043,0.000002866166,0.000034858822,0.00009698755,0.0000021147976,0.0012372189],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99951494,0.00009037341,0.000040373572,0.000034995774,0.00011571222,0.00020364739],"domain_scores_gemma":[0.9983937,0.0003316639,0.0002560935,0.00003971653,0.0005427644,0.00043604668],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001842397,0.00018479003,0.00015302391,0.0012253772,0.0019132639,0.0017470032,0.00046826465,0.00044041543,0.0025593562],"category_scores_gemma":[0.0035091566,0.00013770399,0.0002082265,0.001262571,0.0004126494,0.0018191593,0.0018261707,0.0007596365,0.00027855474],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017792823,0.0005954078,0.5998849,0.0007025531,0.00002693477,0.0021118503,0.06952514,0.0010699331,0.0019837068,0.012483971,0.0071813627,0.30425632],"study_design_scores_gemma":[0.000036960813,0.0007295716,0.6818289,0.0013149733,0.00008959197,0.0006442408,0.2556319,0.005370166,0.0025958673,0.004367174,0.047319442,0.000071231734],"about_ca_topic_score_codex":0.07348329,"about_ca_topic_score_gemma":0.07394724,"teacher_disagreement_score":0.07348329,"about_ca_system_score_codex":0.0048023355,"about_ca_system_score_gemma":0.014078108,"threshold_uncertainty_score":0.14611113},"labels":[],"label_agreement":null},{"id":"W7010206969","doi":"","title":"The Great Egret Roost at Muddy Creek, Essex County, Autumn 2006","year":2024,"lang":"en","type":"article","venue":"Digital Commons - University of South Florida (University of South Florida)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"St. Clair College","funders":"","keywords":"Egret; Archaeomagnetic dating; Exclosure; Period (music)","score_opus":0.0401159358863479,"score_gpt":0.24251254737733038,"score_spread":0.20239661149098248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7010206969","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9233538,0.0004836449,0.0004264827,0.0004717473,0.00006325265,0.000117640324,0.006022245,0.00015810592,0.06890308],"genre_scores_gemma":[0.7745172,0.00046412647,0.0022496416,0.00025590148,0.000017571345,0.0000878471,0.004304262,0.000059719645,0.21804374],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9998264,0.000020367675,0.000007301039,0.000051810675,0.000055977813,0.000038221853],"domain_scores_gemma":[0.99954057,0.00003501637,0.00005403492,0.000030873318,0.00015596431,0.00018364577],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023047421,0.00016843676,0.00011817427,0.0004409586,0.001431494,0.00059469044,0.00040531368,0.00026965083,0.015819356],"category_scores_gemma":[0.00056698354,0.00014115633,0.00007335851,0.0003293404,0.0003141,0.00034563374,0.00059869926,0.00015819287,0.003205983],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005539684,0.00018386844,0.66215193,0.00021998366,0.00008373321,0.0031147623,0.0147573445,0.0005341088,0.01070764,0.00085882173,0.113475874,0.19335805],"study_design_scores_gemma":[0.000008656617,0.00012189376,0.8780149,0.000054908094,0.000011376575,0.0002475807,0.006324447,0.00019111877,0.00072598225,0.000054943608,0.11423522,0.000009064248],"about_ca_topic_score_codex":0.15697052,"about_ca_topic_score_gemma":0.7727676,"teacher_disagreement_score":0.15697052,"about_ca_system_score_codex":0.0016702883,"about_ca_system_score_gemma":0.0010887899,"threshold_uncertainty_score":0.31211364},"labels":[],"label_agreement":null},{"id":"W7010289035","doi":"","title":"Information needs towards service life asset management","year":2000,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Public Works and Government Services Canada","funders":"","keywords":"Asset (computer security); Scope (computer science); Asset management; IT asset management; Domain (mathematical analysis); Service (business); Information needs","score_opus":0.048113362600901495,"score_gpt":0.3164061502215809,"score_spread":0.26829278762067943,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7010289035","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.172223,0.016357597,0.16932409,0.17454349,0.00061892776,0.0002269152,0.0006390791,0.00048595117,0.46558097],"genre_scores_gemma":[0.9168023,0.014447558,0.051989105,0.0025376598,0.0007341702,0.00014328367,0.000851332,0.00011096417,0.01238356],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9942339,0.0024980174,0.00042452384,0.00024541008,0.0021089267,0.0004891471],"domain_scores_gemma":[0.9759093,0.015052631,0.0015482707,0.0012866906,0.0050910325,0.0011121442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006502322,0.0004070561,0.00036800065,0.003049238,0.002324445,0.009812471,0.0011185362,0.0031322602,0.005213239],"category_scores_gemma":[0.025472179,0.0005123685,0.00037415483,0.004722124,0.004694973,0.019273426,0.003935299,0.0019898668,0.0010464222],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007436992,0.00007076437,0.0034140348,0.0006872294,0.000011524741,0.00081023417,0.01378788,0.002767322,0.0011460603,0.86820817,0.012906674,0.09611573],"study_design_scores_gemma":[0.0000185006,0.00006928181,0.0025292942,0.0010050059,0.00003380998,0.0012549438,0.020365877,0.007659858,0.0022815135,0.58458716,0.3801379,0.000056902605],"about_ca_topic_score_codex":0.0067568966,"about_ca_topic_score_gemma":0.002414648,"teacher_disagreement_score":0.009812471,"about_ca_system_score_codex":0.0032293166,"about_ca_system_score_gemma":0.0037340345,"threshold_uncertainty_score":0.034387946},"labels":[],"label_agreement":null},{"id":"W7011040658","doi":"","title":"Lien Master Urges Better Construction Contracts","year":2018,"lang":"fr","type":"article","venue":"eYLS (Yale Law School)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Lien; Process (computing); Multitude; Construction contract","score_opus":0.04491334561698734,"score_gpt":0.3060502459389575,"score_spread":0.2611369003219702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7011040658","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03525442,0.0010253126,0.0037239303,0.574143,0.0011219141,0.00009984651,0.00019590923,0.00013768427,0.3842979],"genre_scores_gemma":[0.5893916,0.001459982,0.0048455168,0.09808737,0.0006381489,0.00007722825,0.00024147448,0.00017252268,0.30508617],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9796466,0.0028742694,0.0004125148,0.0011622017,0.0110589,0.0048455354],"domain_scores_gemma":[0.976909,0.005542057,0.0012824903,0.0015735932,0.008135358,0.0065575265],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012732912,0.00022812943,0.00038905494,0.0009195576,0.010386657,0.011842424,0.0012836684,0.007963031,0.031455886],"category_scores_gemma":[0.037649907,0.0003561623,0.00032021524,0.0014008291,0.011430165,0.005336904,0.0040368256,0.007300915,0.0025398303],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041548104,0.000076072836,0.0077116108,0.00008058313,0.000012220003,0.00025780062,0.0061657093,0.00087814906,0.0006149763,0.5309374,0.42972842,0.023495527],"study_design_scores_gemma":[0.00003166912,0.000035378613,0.007077832,0.0001492501,0.000007236213,0.000057510977,0.0075723543,0.0008220935,0.00032637795,0.038509067,0.9453662,0.000045127454],"about_ca_topic_score_codex":0.62534344,"about_ca_topic_score_gemma":0.8252273,"teacher_disagreement_score":0.62534344,"about_ca_system_score_codex":0.04320779,"about_ca_system_score_gemma":0.10413953,"threshold_uncertainty_score":0.75372595},"labels":[],"label_agreement":null},{"id":"W7011739360","doi":"","title":"The National construction codes need your input","year":2008,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Code (set theory); Field (mathematics); Key (lock); Government (linguistics)","score_opus":0.1308969506365888,"score_gpt":0.3588804535774698,"score_spread":0.227983502940881,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7011739360","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032784445,0.0032676442,0.0021564397,0.8873642,0.01548271,0.00002700831,0.0006142322,0.00012009905,0.087689176],"genre_scores_gemma":[0.2206111,0.012222538,0.012830399,0.52496636,0.01481352,0.0002641891,0.0023389244,0.0012630331,0.21068998],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9776413,0.006127144,0.0021548427,0.001098436,0.009935321,0.0030429305],"domain_scores_gemma":[0.8546583,0.051474426,0.0050801276,0.0077142743,0.07607211,0.005000767],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016644618,0.00069570396,0.0011183241,0.0025998892,0.01058555,0.011965917,0.0022871362,0.012337942,0.02284259],"category_scores_gemma":[0.14285119,0.000657653,0.00091008947,0.0051106685,0.0085172085,0.014430684,0.004512467,0.021071667,0.0071332827],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034298922,0.000019138512,0.001869855,0.00016577817,0.000011312816,0.00019899718,0.0036921792,0.00019377735,0.00014159785,0.17817813,0.793277,0.022217872],"study_design_scores_gemma":[0.000008805194,0.000008317769,0.0018968058,0.00057726825,0.000007680635,0.00012353373,0.006437839,0.00016429347,0.00015774427,0.021076147,0.96947956,0.00006202609],"about_ca_topic_score_codex":0.28020832,"about_ca_topic_score_gemma":0.33583933,"teacher_disagreement_score":0.28020832,"about_ca_system_score_codex":0.0136667695,"about_ca_system_score_gemma":0.030017827,"threshold_uncertainty_score":0.55715466},"labels":[],"label_agreement":null},{"id":"W7015082891","doi":"","title":"Risk profile modeling for large scale projects : case study of a transmission line project","year":2013,"lang":"en","type":"other","venue":"cIRcle (University of British Columbia)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Stakeholder; Context (archaeology); Risk assessment; Identification (biology); Risk management; Scale (ratio); Probabilistic risk assessment; Project risk management; Grid; Scope (computer science); Procurement","score_opus":0.04535983802813522,"score_gpt":0.2766943672087684,"score_spread":0.23133452918063316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7015082891","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93133074,0.00019653978,0.05454901,0.0011843273,0.000023531202,0.00054417725,0.00071092,0.00024038088,0.0112203825],"genre_scores_gemma":[0.93994796,0.00029133543,0.054815486,0.000056460984,0.000011738981,0.00025875043,0.00046389957,0.00006830412,0.004086003],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99792093,0.0012101547,0.00010935062,0.00020397069,0.00035565285,0.00019996375],"domain_scores_gemma":[0.9909083,0.0067166924,0.00060302473,0.0004289683,0.00088467,0.00045829045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038872582,0.0009243499,0.0005183032,0.0017458851,0.001745748,0.0028012907,0.0018764614,0.0028008642,0.0022764327],"category_scores_gemma":[0.00747512,0.0006661313,0.0010279185,0.001998541,0.001248883,0.0019804244,0.0018511658,0.0020605696,0.00031511558],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024503085,0.0009983043,0.036353406,0.00028728836,0.00007862226,0.0048234574,0.004503911,0.91268516,0.0020940697,0.010945408,0.0023300694,0.024655359],"study_design_scores_gemma":[0.000042976186,0.00027071818,0.0075095193,0.000086456865,0.00003409652,0.0004404864,0.006983342,0.97521234,0.0012309704,0.0042314446,0.0039006905,0.00005692193],"about_ca_topic_score_codex":0.0402785,"about_ca_topic_score_gemma":0.049906146,"teacher_disagreement_score":0.0402785,"about_ca_system_score_codex":0.0028195383,"about_ca_system_score_gemma":0.002275418,"threshold_uncertainty_score":0.08008808},"labels":[],"label_agreement":null},{"id":"W7015442583","doi":"","title":"Solutions for the construction industry : new and improved National Research Council web site","year":2003,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Web site; Construction industry; Research council; Construction management; Key (lock)","score_opus":0.40304122088597466,"score_gpt":0.41645084911482033,"score_spread":0.013409628228845671,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7015442583","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005212803,0.0034321551,0.048947036,0.037099306,0.0105189,0.0011452608,0.0062884763,0.016097669,0.87125826],"genre_scores_gemma":[0.011733289,0.0029561876,0.053444125,0.0021037671,0.0014629536,0.00035179863,0.008835964,0.0031847258,0.9159272],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9941354,0.0006727595,0.00022124994,0.00019439697,0.004505627,0.00027058934],"domain_scores_gemma":[0.97637546,0.0024122982,0.0004869842,0.0020321193,0.015580158,0.0031129606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0054824534,0.00063112495,0.0005512604,0.003169516,0.0017787048,0.0046561332,0.0016386135,0.0034766826,0.28415698],"category_scores_gemma":[0.015999332,0.0007052537,0.00049220695,0.003037715,0.0006632519,0.004041155,0.002407782,0.002698869,0.14041287],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025144305,0.0001671078,0.00027204998,0.00017402117,0.0000036120905,0.000047225225,0.000073910975,0.00020781538,0.0010258564,0.0031480435,0.8057114,0.18914375],"study_design_scores_gemma":[0.000024588577,0.000029021397,0.0007614833,0.000069431735,0.0000043650302,0.000046326993,0.000069043024,0.0008107911,0.000684744,0.0013643331,0.9961216,0.000014333652],"about_ca_topic_score_codex":0.014432475,"about_ca_topic_score_gemma":0.033244755,"teacher_disagreement_score":0.28415698,"about_ca_system_score_codex":0.0018285104,"about_ca_system_score_gemma":0.008652251,"threshold_uncertainty_score":0.9505998},"labels":[],"label_agreement":null},{"id":"W7017537061","doi":"","title":"Barrick Keeps Key Projects On Track and Delivers Another Quarter of Improved Production and Costs","year":2023,"lang":"en","type":"other","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Track (disk drive); Key (lock); Production (economics); Quarter (Canadian coin); Window (computing)","score_opus":0.0481147888208292,"score_gpt":0.3103622547444486,"score_spread":0.2622474659236194,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017537061","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0033233499,0.00025576467,0.002242873,0.0039853626,0.0009197914,0.000110610745,0.0013536295,0.0019911882,0.9858174],"genre_scores_gemma":[0.0045425524,0.00009272657,0.0007206926,0.00030106743,0.000037598467,0.000020507481,0.00055451744,0.00035533798,0.9933749],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987643,0.00008656402,0.000021992284,0.000110263754,0.0007971416,0.00021976278],"domain_scores_gemma":[0.9970458,0.00024129897,0.00006572971,0.0003458707,0.0013974766,0.0009037957],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0014483872,0.000712335,0.00038812216,0.001984827,0.0021020821,0.005324439,0.0010074127,0.0024988602,0.3927804],"category_scores_gemma":[0.0037658787,0.00048841594,0.00039263797,0.0007994274,0.0008178896,0.0014774351,0.00223156,0.0025853517,0.15249765],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011724004,0.000118597236,0.0006909267,0.000064860855,0.0000044843455,0.00006625073,0.000056766992,0.00029198563,0.0016856245,0.015841031,0.8301182,0.15094401],"study_design_scores_gemma":[0.000015964259,0.00004360215,0.0024514017,0.000028838038,0.0000029102478,0.000070556474,0.0000974284,0.00087845937,0.0009691871,0.0014804004,0.9939476,0.000013591371],"about_ca_topic_score_codex":0.027632847,"about_ca_topic_score_gemma":0.095985286,"teacher_disagreement_score":0.3927804,"about_ca_system_score_codex":0.0034042154,"about_ca_system_score_gemma":0.0072968067,"threshold_uncertainty_score":0.86612505},"labels":[],"label_agreement":null},{"id":"W7018352329","doi":"","title":"Delta-Marriott hotel project: A case study of construction innovations in building a hotel project in Ontario, Canada","year":2018,"lang":"en","type":"other","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Work (physics); Tourism; Government (linguistics); Agency (philosophy); Key (lock)","score_opus":0.04051269403798706,"score_gpt":0.31000653777593407,"score_spread":0.269493843737947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7018352329","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9683052,0.00048520404,0.00059516117,0.0007173303,0.000011858327,0.00032646683,0.00033269095,0.000016135338,0.029209886],"genre_scores_gemma":[0.9754539,0.0005955535,0.0010481481,0.00007172078,0.0000027749345,0.000068933085,0.00018707976,0.00000943156,0.022562448],"study_design_codex":"observational","study_design_gemma":"case_report","domain_scores_codex":[0.9986124,0.0002529265,0.000036583337,0.00008165248,0.0004595978,0.0005568107],"domain_scores_gemma":[0.9984281,0.00026884332,0.00012797664,0.000061308194,0.000575078,0.00053875503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010732159,0.00033786232,0.00025247157,0.0012172804,0.0076190354,0.002236665,0.0013319199,0.00085581467,0.00303336],"category_scores_gemma":[0.0019902845,0.0003054721,0.00025196897,0.0029645576,0.002363875,0.00048299244,0.001733004,0.00074897346,0.00020511051],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009026995,0.0016302723,0.4971119,0.0011925506,0.00016079917,0.022695215,0.19236897,0.008818213,0.008283,0.024697743,0.020040542,0.22209813],"study_design_scores_gemma":[0.000051735413,0.00040753622,0.6493496,0.0003716579,0.000048593687,0.00086239335,0.26643556,0.0033061802,0.0014633797,0.0006134783,0.0770249,0.000065051594],"about_ca_topic_score_codex":0.9772414,"about_ca_topic_score_gemma":0.9966184,"teacher_disagreement_score":0.05677953,"about_ca_system_score_codex":0.05677953,"about_ca_system_score_gemma":0.079839304,"threshold_uncertainty_score":0.41196626},"labels":[],"label_agreement":null},{"id":"W7018825145","doi":"","title":"Effects - Based Approaches to Operations [EBO] : Canadian Perspectives","year":2008,"lang":"en","type":"book","venue":"Virtual Defense Library (Ministerio de Defensa)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Work (physics); Context (archaeology); Perspective (graphical)","score_opus":0.13002472282622426,"score_gpt":0.27824339550511057,"score_spread":0.1482186726788863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7018825145","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031838971,0.04979786,0.022082038,0.016174583,0.0006240679,0.00004403789,0.00019696588,0.000085828535,0.9078106],"genre_scores_gemma":[0.4864812,0.20232373,0.028728068,0.0038890236,0.0009808897,0.00019599654,0.00038116102,0.00041229883,0.2766077],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9968573,0.0007689518,0.00009039705,0.00021200148,0.0013863234,0.00068498123],"domain_scores_gemma":[0.99813855,0.00079551066,0.00008989763,0.00012156422,0.00067237974,0.00018202525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032926647,0.002016102,0.0010093811,0.0072212755,0.0073254653,0.014264336,0.0042490433,0.0026586838,0.015540906],"category_scores_gemma":[0.0042178566,0.0010252163,0.0011269586,0.013670222,0.02358431,0.008485411,0.0031275812,0.0038537376,0.0009618702],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000065859895,0.000011710714,0.00007509513,0.00010203689,0.0000053531558,0.000028075161,0.00064927904,0.0023412385,0.000033676315,0.9757372,0.0070210034,0.013988656],"study_design_scores_gemma":[0.000016479764,0.000014248656,0.0013551478,0.00071456435,0.00004370863,0.00006911678,0.0032375085,0.003329228,0.0001424202,0.58312184,0.40790737,0.000048342255],"about_ca_topic_score_codex":0.92964756,"about_ca_topic_score_gemma":0.9398687,"teacher_disagreement_score":0.10081171,"about_ca_system_score_codex":0.10081171,"about_ca_system_score_gemma":0.07329653,"threshold_uncertainty_score":0.7314436},"labels":[],"label_agreement":null},{"id":"W7018960096","doi":"","title":"Encouraging innovation in construction products","year":2007,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Process (computing); Product (mathematics); Work (physics); Production (economics); Information system","score_opus":0.07778968075543281,"score_gpt":0.36050772687253363,"score_spread":0.28271804611710083,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7018960096","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.52023846,0.005236725,0.027288454,0.0050659217,0.0002873655,0.0014887257,0.00010791037,0.00031385518,0.43997255],"genre_scores_gemma":[0.93117136,0.0042960444,0.03357433,0.00093452644,0.00015161693,0.0007294373,0.00011646003,0.00008474077,0.028941518],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9860939,0.0047015348,0.00030090756,0.0005431751,0.007276146,0.0010843251],"domain_scores_gemma":[0.9890287,0.006965447,0.0007633038,0.00064467423,0.002074206,0.0005237067],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0067699053,0.00040846676,0.00030729655,0.0013592533,0.001773996,0.0037655763,0.00082350377,0.001370463,0.005880324],"category_scores_gemma":[0.013976704,0.0001622349,0.00044031633,0.0009986236,0.0021724622,0.0016746082,0.0033463147,0.0010110755,0.0008637745],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004555324,0.0020078123,0.01643784,0.0039393413,0.0000792776,0.0012535646,0.016237592,0.0051765223,0.09089893,0.13537438,0.020646352,0.7074928],"study_design_scores_gemma":[0.00019379328,0.003954018,0.05805091,0.0017338176,0.00015536898,0.0012396083,0.014580527,0.0037965376,0.14044315,0.047667872,0.7280374,0.00014706126],"about_ca_topic_score_codex":0.0054109143,"about_ca_topic_score_gemma":0.01199824,"teacher_disagreement_score":0.0067699053,"about_ca_system_score_codex":0.003256889,"about_ca_system_score_gemma":0.005526305,"threshold_uncertainty_score":0.03580314},"labels":[],"label_agreement":null},{"id":"W7019352700","doi":"","title":"The Front-end of Large Public Projects : Paradoxes and Ways Ahead","year":2022,"lang":"en","type":"book","venue":"BiblioBoard Library Catalog (Open Research Library)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Nucleofection; Gestational period; TSG101; Hyporeflexia; Diafiltration; Articular cartilage damage; Pretext; Dysgeusia","score_opus":0.2243567694464891,"score_gpt":0.3936310875344926,"score_spread":0.1692743180880035,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7019352700","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046905663,0.012259277,0.03790531,0.11505825,0.000997564,0.00016847144,0.00015198963,0.00028595902,0.7862675],"genre_scores_gemma":[0.8319372,0.01305806,0.017014481,0.006464822,0.00043164624,0.00038479498,0.00020708304,0.0004345014,0.13006742],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9888283,0.0058220224,0.0002488549,0.00068734627,0.0034672674,0.0009463215],"domain_scores_gemma":[0.98879355,0.0073705297,0.0007255561,0.0009128998,0.0013101028,0.0008874804],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010757523,0.0004790054,0.00087775127,0.0017282894,0.008516238,0.028027188,0.0020279477,0.004119214,0.010652214],"category_scores_gemma":[0.023653788,0.0006604475,0.00058945257,0.0046185665,0.018112801,0.030405695,0.008332314,0.0062236898,0.0018829018],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012652971,0.00003920749,0.00032862078,0.00011316925,0.00000499218,0.00015390002,0.012386292,0.0006492045,0.00008853164,0.93507266,0.024473634,0.026676996],"study_design_scores_gemma":[0.00001645386,0.00002559667,0.00086504593,0.0004503852,0.000005364545,0.00017175934,0.03766132,0.002115853,0.00015934516,0.70943314,0.24906828,0.000027362139],"about_ca_topic_score_codex":0.008577932,"about_ca_topic_score_gemma":0.011621924,"teacher_disagreement_score":0.028027188,"about_ca_system_score_codex":0.012032657,"about_ca_system_score_gemma":0.009568085,"threshold_uncertainty_score":0.08730346},"labels":[],"label_agreement":null},{"id":"W7020251346","doi":"","title":"Innoframe: a project and portfolio management multilayer framework to support innovation-driven SMEs","year":2020,"lang":"en","type":"article","venue":"RepositóriUM (Universidade do Minho)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Fundação para a Ciência e a Tecnologia","keywords":"Project portfolio management; Portfolio; IT portfolio management; Pipeline (software); Project management; Application portfolio management","score_opus":0.08244277653591635,"score_gpt":0.3522968644542832,"score_spread":0.26985408791836685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7020251346","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06846935,0.0015259947,0.827113,0.008369157,0.0002225313,0.0013909892,0.00055286917,0.0030798244,0.08927632],"genre_scores_gemma":[0.32704547,0.0009286172,0.6609001,0.0003935644,0.00005707897,0.0008392342,0.00075460516,0.000113107046,0.008968276],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9955649,0.0023765855,0.00042769915,0.00025010787,0.0009175661,0.0004631824],"domain_scores_gemma":[0.9967237,0.0010313733,0.0004491435,0.00038165925,0.000555491,0.0008586761],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008222897,0.0006004279,0.0004653683,0.0030429547,0.0014193889,0.005677903,0.0016932164,0.0012722131,0.0024903482],"category_scores_gemma":[0.008110595,0.00028193137,0.0006492433,0.0020124097,0.0012728167,0.0067938208,0.006757303,0.0013083495,0.0007357772],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023618933,0.0008162675,0.0123755215,0.0010322963,0.00011276449,0.0008844999,0.010643795,0.013897311,0.0048726317,0.4493144,0.015912663,0.4899017],"study_design_scores_gemma":[0.00014553692,0.0008391362,0.012711229,0.0025143155,0.00022028339,0.0017458121,0.01510561,0.13400786,0.006366144,0.29833806,0.5277528,0.0002532812],"about_ca_topic_score_codex":0.004416887,"about_ca_topic_score_gemma":0.007841508,"teacher_disagreement_score":0.008222897,"about_ca_system_score_codex":0.0025872162,"about_ca_system_score_gemma":0.007453589,"threshold_uncertainty_score":0.04348731},"labels":[],"label_agreement":null},{"id":"W7021129347","doi":"","title":"2010 National Model Construction Codes available this November","year":2010,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Code (set theory); Government (linguistics); Field (mathematics)","score_opus":0.08370387765178657,"score_gpt":0.3364657408631086,"score_spread":0.25276186321132205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7021129347","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0047738175,0.0005704334,0.07773824,0.004620231,0.0023064197,0.0008913771,0.20813484,0.005105164,0.69585943],"genre_scores_gemma":[0.048604168,0.0020053857,0.11130235,0.0011799448,0.00020009966,0.0037524558,0.2472732,0.004102145,0.5815802],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9956091,0.0008020052,0.00037826857,0.00030456219,0.0024796012,0.00042654277],"domain_scores_gemma":[0.99030894,0.0016426396,0.00035158946,0.0014559685,0.005967074,0.00027386256],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028092915,0.00128808,0.0009173842,0.003954036,0.002201225,0.005000372,0.0022727663,0.0031578674,0.1369494],"category_scores_gemma":[0.016372187,0.0011658026,0.0014573219,0.0056905053,0.0010054595,0.0034174933,0.0018158695,0.0032137274,0.07106294],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009905065,0.00006994625,0.0010041354,0.00023592456,0.000013064583,0.00004717173,0.00019348285,0.022329351,0.00029610767,0.22090013,0.7184851,0.03632658],"study_design_scores_gemma":[0.000032417476,0.000013009432,0.0009109477,0.00022965795,0.000008429726,0.00004233245,0.00014444315,0.01387258,0.00040210667,0.021413602,0.9628838,0.00004668584],"about_ca_topic_score_codex":0.24917251,"about_ca_topic_score_gemma":0.23599036,"teacher_disagreement_score":0.24917251,"about_ca_system_score_codex":0.013335182,"about_ca_system_score_gemma":0.029429482,"threshold_uncertainty_score":0.4954443},"labels":[],"label_agreement":null},{"id":"W7023857772","doi":"","title":"Poland Construction Equipment Market Sales to Reach 15.12 Thousand Units by 2029 – Arizton – US and Canada Report","year":2024,"lang":"en","type":"other","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Sales management; Work (physics); Unit (ring theory); Construction industry","score_opus":0.0319765341940543,"score_gpt":0.30332566427161783,"score_spread":0.27134913007756356,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7023857772","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.049020555,0.0019150428,0.0026284459,0.005381732,0.00080045004,0.00049445964,0.26713112,0.0013339771,0.6712942],"genre_scores_gemma":[0.048357014,0.0015837215,0.0019721203,0.0006344938,0.000054480603,0.00015095576,0.095766015,0.00027276776,0.8512085],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99940276,0.000013933509,0.00002707441,0.000048562557,0.00040775718,0.000099874225],"domain_scores_gemma":[0.9992964,0.000026483764,0.0000466484,0.000022008766,0.0005302216,0.00007815208],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049233274,0.00054421794,0.00022268904,0.0016007996,0.000704359,0.002192422,0.00045597285,0.0006880167,0.052412987],"category_scores_gemma":[0.0013022337,0.00054352975,0.00035221054,0.0014358718,0.00018774855,0.0009132587,0.0009160191,0.0010453355,0.021956716],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038787068,0.00013692929,0.0075408462,0.000255457,0.00003098401,0.00012433143,0.000079940255,0.00090213516,0.0014567612,0.0057115257,0.9309404,0.052432854],"study_design_scores_gemma":[0.000046268146,0.00004076578,0.063889556,0.00007070487,0.00001686437,0.00005047492,0.00014827141,0.0008666669,0.0030759112,0.00048337807,0.93129694,0.000014042038],"about_ca_topic_score_codex":0.31239536,"about_ca_topic_score_gemma":0.42259815,"teacher_disagreement_score":0.68760467,"about_ca_system_score_codex":0.004868147,"about_ca_system_score_gemma":0.009682329,"threshold_uncertainty_score":0.62115407},"labels":[],"label_agreement":null},{"id":"W7025389163","doi":"","title":"Victoriaâs street trees : planning for climate change through species selection and arboricultural maintenance practices","year":2009,"lang":"en","type":"other","venue":"Library and Archives Canada (Government of Canada)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Climate change; Evapotranspiration; Precipitation; Selection (genetic algorithm); Forest health; Water balance; Moisture","score_opus":0.034519161360534505,"score_gpt":0.25006031461586137,"score_spread":0.21554115325532686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7025389163","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9347109,0.0008744465,0.0034786079,0.0030859727,0.00002083564,0.00060484034,0.0020669966,0.0002817725,0.054875683],"genre_scores_gemma":[0.97037417,0.0008685656,0.010740303,0.0001251742,0.000007753103,0.00020370068,0.0009709081,0.000041468495,0.016668024],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99942917,0.00018872585,0.000012472654,0.000049531216,0.00012913089,0.00019083252],"domain_scores_gemma":[0.9987821,0.00008502995,0.00011521141,0.000024240606,0.0003325221,0.0006608522],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005341852,0.00019432466,0.00019150926,0.0011148227,0.0018248883,0.001942327,0.0013684168,0.00035070113,0.006191441],"category_scores_gemma":[0.0016747651,0.00022154162,0.00020073986,0.0014675796,0.00030277992,0.00045625414,0.0009936733,0.00039290232,0.0007281719],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023492056,0.00068799395,0.48036847,0.00040960207,0.000089130765,0.0007523289,0.006069212,0.016595433,0.0056066434,0.0020345626,0.035384804,0.4517669],"study_design_scores_gemma":[0.00003245847,0.00037660004,0.89687324,0.00024086959,0.000080599384,0.0001455269,0.02585263,0.025778538,0.00082930236,0.0012917232,0.04844181,0.00005674781],"about_ca_topic_score_codex":0.6222646,"about_ca_topic_score_gemma":0.90427524,"teacher_disagreement_score":0.37773538,"about_ca_system_score_codex":0.007221337,"about_ca_system_score_gemma":0.015802596,"threshold_uncertainty_score":0.7599199},"labels":[],"label_agreement":null},{"id":"W7030503774","doi":"","title":"New NRC-IRC expertise to tackle productivity in construction sector","year":2007,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Production (economics); Capital (architecture); Context (archaeology)","score_opus":0.07101796590151661,"score_gpt":0.35760143904661706,"score_spread":0.28658347314510046,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7030503774","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09383514,0.014742372,0.31928432,0.12803935,0.0031977957,0.0008022641,0.0012869204,0.0017865979,0.43702522],"genre_scores_gemma":[0.6303053,0.008893391,0.20225923,0.0076721706,0.0029901373,0.0006698595,0.0011352327,0.0006450866,0.14542961],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98107946,0.0040065995,0.0009701603,0.0017507076,0.010014809,0.0021783754],"domain_scores_gemma":[0.95845324,0.011003861,0.002310123,0.004929047,0.018211422,0.00509226],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02363251,0.001295293,0.0011900653,0.0053312266,0.0031942423,0.00650671,0.003549828,0.004405606,0.018051125],"category_scores_gemma":[0.028351631,0.00055771926,0.0012401354,0.0042318907,0.00233255,0.00470976,0.008270632,0.0046399427,0.00324273],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026101296,0.0012182305,0.019015787,0.0014719531,0.00018679352,0.00067228713,0.0029368412,0.034548067,0.011237762,0.20712402,0.09287828,0.6284489],"study_design_scores_gemma":[0.00025060054,0.00073455035,0.05631381,0.0021086044,0.00017050304,0.0010128765,0.006098328,0.086587064,0.011331229,0.11582429,0.71926427,0.0003038192],"about_ca_topic_score_codex":0.081997074,"about_ca_topic_score_gemma":0.09291121,"teacher_disagreement_score":0.081997074,"about_ca_system_score_codex":0.016883533,"about_ca_system_score_gemma":0.0425667,"threshold_uncertainty_score":0.16303957},"labels":[],"label_agreement":null},{"id":"W7032747359","doi":"","title":"Parents, personalized infographics, and the Canadian 24-Hour Movement Guidelines for Children and Youth","year":2021,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Movement (music); Action (physics); MEDLINE; Qualitative research","score_opus":0.1357553507934207,"score_gpt":0.3626535001152252,"score_spread":0.2268981493218045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7032747359","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35989696,0.0053939195,0.007419891,0.07088819,0.0007915018,0.00088918785,0.005691212,0.00095160457,0.5480775],"genre_scores_gemma":[0.90240645,0.00342171,0.016620915,0.0024702342,0.00006931148,0.00068869814,0.0017593628,0.00012575547,0.072437644],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9970962,0.00064352463,0.000117552845,0.00010794645,0.001282928,0.0007519477],"domain_scores_gemma":[0.9913123,0.0013729839,0.00049740577,0.00027987294,0.0035300963,0.0030073114],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039157555,0.00024242462,0.00024947978,0.0020960316,0.0051044486,0.0030865665,0.00148509,0.0012052539,0.015947137],"category_scores_gemma":[0.015694322,0.00027843897,0.00033610582,0.0024954372,0.0014644524,0.0012321163,0.0018009448,0.0014675088,0.00077113335],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013381572,0.0006820869,0.07951983,0.00031186,0.000022768842,0.00033020077,0.023204263,0.0016083089,0.00030605172,0.045437977,0.3995494,0.4488935],"study_design_scores_gemma":[0.000069686386,0.00016514452,0.4062039,0.0020084558,0.00007596441,0.00016983371,0.047545522,0.0013788515,0.00063987024,0.007515028,0.53406477,0.00016309634],"about_ca_topic_score_codex":0.96388143,"about_ca_topic_score_gemma":0.9909406,"teacher_disagreement_score":0.036118567,"about_ca_system_score_codex":0.026277607,"about_ca_system_score_gemma":0.13489254,"threshold_uncertainty_score":0.19065827},"labels":[],"label_agreement":null},{"id":"W7033130394","doi":"","title":"Penyimpangan Aqidah dalam Sedekah Laut di Kelurahan Bandengan Kecamatan Kota Kendal Kabupaten Kendal &#13;\\n&#13;\\n","year":2012,"lang":"id","type":"dissertation","venue":"Walisongo Repository (Walisongo State Islamic University)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Fireworks; Coker unit; Nova scotia","score_opus":0.022507636976021903,"score_gpt":0.25935154575442354,"score_spread":0.23684390877840164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7033130394","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18003872,0.021761838,0.029502863,0.01692533,0.006295732,0.00051540753,0.0014477257,0.0009731229,0.7425392],"genre_scores_gemma":[0.2446317,0.010558849,0.02462634,0.0034544882,0.0005414419,0.0002246814,0.0008562248,0.00037409225,0.7147321],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99936885,0.00009839996,0.00003669711,0.00013110484,0.0002721664,0.00009270456],"domain_scores_gemma":[0.9993492,0.00011624247,0.00005843444,0.00008465801,0.00031670684,0.00007482537],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011594164,0.0007149377,0.0005288447,0.0007500909,0.0022936368,0.0037634326,0.00083774823,0.0012206883,0.055951066],"category_scores_gemma":[0.0009408067,0.00035441795,0.0005331757,0.00069329684,0.0013004371,0.0021895398,0.0021768296,0.0015933106,0.01344641],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018989377,0.0006742879,0.013156833,0.0027103147,0.00014212698,0.0023172195,0.009300165,0.0006733318,0.18183838,0.08010691,0.06802998,0.63915145],"study_design_scores_gemma":[0.000034017343,0.00034982702,0.009752715,0.00033290344,0.00006450354,0.00067434006,0.0046484848,0.0004396581,0.029979074,0.005241426,0.9484185,0.00006463939],"about_ca_topic_score_codex":0.0038948967,"about_ca_topic_score_gemma":0.009568429,"teacher_disagreement_score":0.055951066,"about_ca_system_score_codex":0.0014864044,"about_ca_system_score_gemma":0.0019944287,"threshold_uncertainty_score":0.18717492},"labels":[],"label_agreement":null},{"id":"W7033574208","doi":"","title":"Regulators in Quebec, rest of Canada break logjam on poison-pill reform","year":2014,"lang":"en","type":"article","venue":"eYLS (Yale Law School)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Rest (music); Government (linguistics); Work (physics)","score_opus":0.022116901467814486,"score_gpt":0.2766676057387476,"score_spread":0.2545507042709331,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7033574208","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14771596,0.011567639,0.0033791019,0.410595,0.002037596,0.0003261789,0.0032283615,0.00060238945,0.42054772],"genre_scores_gemma":[0.54791576,0.0029289518,0.0023009698,0.105110876,0.00028450182,0.00013157897,0.000439426,0.000189007,0.34069896],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9912423,0.001117303,0.00019140395,0.0006626478,0.0035035785,0.003282731],"domain_scores_gemma":[0.9899935,0.0018778308,0.00048334495,0.00035997285,0.0055622854,0.0017231123],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0055526416,0.00043458038,0.00064594066,0.0016970728,0.017971745,0.011956957,0.0021511037,0.008783346,0.014930484],"category_scores_gemma":[0.014240621,0.0006581007,0.00079112704,0.0028395567,0.0062098405,0.0022277683,0.0022911406,0.0062068366,0.0008299158],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017688038,0.00009951069,0.020828882,0.00017083544,0.00009454488,0.00058987126,0.0040971013,0.0026788968,0.0011425414,0.36783302,0.5598038,0.04248413],"study_design_scores_gemma":[0.00013764024,0.00006211236,0.05436768,0.00034455917,0.0000943445,0.00006090107,0.0058365534,0.0017950173,0.000959388,0.012777453,0.92339206,0.00017225207],"about_ca_topic_score_codex":0.995413,"about_ca_topic_score_gemma":0.99811816,"teacher_disagreement_score":0.13407041,"about_ca_system_score_codex":0.13407041,"about_ca_system_score_gemma":0.26976734,"threshold_uncertainty_score":0.97275347},"labels":[],"label_agreement":null},{"id":"W7034353956","doi":"","title":"Transit Use During and After the COVID-19 Pandemic: The “New Normal” for Public Transit Ridership","year":2023,"lang":"en","type":"article","venue":"eScholarship (California Digital Library)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"National Commission for Science and Technology; University of Vermont; U.S. Department of Transportation","keywords":"Transit (satellite); Public transport; Rail transit; Transit system; Sustainability; Pandemic","score_opus":0.1270615934119943,"score_gpt":0.3056774889075453,"score_spread":0.178615895495551,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7034353956","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9928268,0.0003783563,0.00014547804,0.0013952103,0.000024816687,0.000026629981,0.0012199038,0.000008030878,0.003974789],"genre_scores_gemma":[0.9984511,0.00021943422,0.000077908335,0.0000748533,0.0000066481707,0.000006737516,0.00056708447,0.000002398215,0.0005937862],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99938285,0.000052801257,0.000023513014,0.00005968019,0.00013994938,0.00034115723],"domain_scores_gemma":[0.9981534,0.00015437172,0.00041819605,0.000067472625,0.0005458379,0.0006607291],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059655076,0.00020027893,0.0002456935,0.00058774574,0.001496498,0.00175519,0.0006150626,0.00046519065,0.0024090137],"category_scores_gemma":[0.002404247,0.000156485,0.0005952025,0.0011408188,0.0009352673,0.0012806162,0.0011145545,0.0010439666,0.000188771],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007975905,0.000032030763,0.98637253,0.000030542404,0.000025428324,0.00009929734,0.002963814,0.00016207379,0.00014100998,0.0002822442,0.001374605,0.008436661],"study_design_scores_gemma":[0.0000010703748,0.000015721707,0.9926928,0.000026435511,0.000008191135,0.0000137288525,0.006134939,0.00019244234,0.000034450302,0.000031120733,0.00084301335,0.000006066261],"about_ca_topic_score_codex":0.94656837,"about_ca_topic_score_gemma":0.9754318,"teacher_disagreement_score":0.94656837,"about_ca_system_score_codex":0.010113814,"about_ca_system_score_gemma":0.013704416,"threshold_uncertainty_score":0.107492566},"labels":[],"label_agreement":null},{"id":"W7034677337","doi":"","title":"The View from Langley: The CIA and Pierre Elliott Trudeau in the Era of “Canada First” Economic Nationalism","year":2023,"lang":"en","type":"article","venue":"Project Muse (Johns Hopkins University)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Economic nationalism; Government (linguistics); Nationalism; Perspective (graphical); Economic sanctions; Economic power; Economic liberalization; Economic diplomacy; Context (archaeology)","score_opus":0.034516674150220035,"score_gpt":0.26040105333990127,"score_spread":0.22588437918968124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7034677337","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034361181,0.019479554,0.0009000084,0.91076833,0.0023498943,0.000009236837,0.000079032216,0.000024885248,0.06295296],"genre_scores_gemma":[0.41553313,0.038481284,0.004660238,0.36930367,0.005376446,0.000102387225,0.000092773014,0.00037301306,0.16607705],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99455357,0.0019484363,0.00010377602,0.0006992574,0.0017428424,0.00095217285],"domain_scores_gemma":[0.9903681,0.0041506346,0.00027877087,0.00028559242,0.0024407515,0.002476156],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0066383453,0.0006664206,0.00079330977,0.0018091308,0.01579538,0.01956198,0.0021327904,0.0106958365,0.0062169097],"category_scores_gemma":[0.014572989,0.00041382705,0.0004013519,0.002798644,0.03840687,0.011220877,0.0043169935,0.018990654,0.00088041497],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034383796,0.000015838363,0.00035035968,0.000049829145,0.000007017455,0.00007783703,0.005300902,0.00025113573,0.000036836187,0.67104465,0.3153457,0.007485479],"study_design_scores_gemma":[0.000020955917,0.000008601497,0.0005204447,0.00040271756,0.000007766144,0.000052246072,0.0077345367,0.00026917848,0.000119577395,0.17860125,0.81220144,0.000061351624],"about_ca_topic_score_codex":0.75758785,"about_ca_topic_score_gemma":0.80869204,"teacher_disagreement_score":0.24241215,"about_ca_system_score_codex":0.049117237,"about_ca_system_score_gemma":0.07034952,"threshold_uncertainty_score":0.48767948},"labels":[],"label_agreement":null},{"id":"W7039817169","doi":"","title":"2005 National Construction Codes: more responsive to innovation and renovation","year":2006,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Code (set theory); Property (philosophy); Work (physics); Production (economics); Affect (linguistics)","score_opus":0.05600065146565892,"score_gpt":0.359743038906485,"score_spread":0.3037423874408261,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7039817169","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40058845,0.0067988927,0.021200728,0.12885484,0.0040951376,0.00029223177,0.00058813626,0.0004192043,0.4371623],"genre_scores_gemma":[0.9066128,0.002923998,0.0150118945,0.018726598,0.0009326797,0.00016572743,0.0006906324,0.00016656323,0.054769028],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9886367,0.0024694544,0.0005512292,0.00052786473,0.006763302,0.0010514494],"domain_scores_gemma":[0.970077,0.0074574756,0.006355946,0.0012193916,0.013079618,0.0018105808],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0053091096,0.00025784067,0.00020834625,0.001473414,0.0019149802,0.004468208,0.00087253883,0.002521741,0.004013395],"category_scores_gemma":[0.036519453,0.0001686005,0.00027688846,0.0019469351,0.0019044564,0.002113334,0.0015209038,0.0027414123,0.00059346686],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014418957,0.00035384932,0.07820364,0.0005520503,0.00004400038,0.00059075735,0.009520702,0.0062944028,0.008199143,0.31533545,0.18327533,0.3974865],"study_design_scores_gemma":[0.000020775975,0.0002496499,0.12306767,0.0002998646,0.000017073333,0.00039113685,0.0048526693,0.0024190103,0.00324412,0.008365799,0.8569589,0.000113213966],"about_ca_topic_score_codex":0.054099116,"about_ca_topic_score_gemma":0.119603954,"teacher_disagreement_score":0.054099116,"about_ca_system_score_codex":0.012056073,"about_ca_system_score_gemma":0.010695574,"threshold_uncertainty_score":0.10756844},"labels":[],"label_agreement":null},{"id":"W7040034228","doi":"","title":"Toronto 2014","year":2021,"lang":"","type":"other","venue":"Bulletin of Miscellaneous Information (Royal Gardens Kew)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"","score_opus":0.014990654963441662,"score_gpt":0.24055015550842915,"score_spread":0.2255595005449875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7040034228","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00047664627,0.004915392,0.00042006883,0.003589575,0.0026727428,0.000048718404,0.014097931,0.0005545223,0.9732246],"genre_scores_gemma":[0.0007733855,0.0012973725,0.00013876754,0.00015367726,0.000095537944,0.000012061111,0.001676524,0.000109201756,0.99574345],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99944156,0.000045644356,0.000019775742,0.00008657598,0.00030467537,0.000101778205],"domain_scores_gemma":[0.9989121,0.00007488164,0.000043512522,0.0001436174,0.00049105607,0.00033482295],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00051383453,0.0011001654,0.0006412471,0.0017162526,0.0023236002,0.0046972507,0.00088515104,0.0014393007,0.7299941],"category_scores_gemma":[0.0014560554,0.0007005756,0.0004755872,0.003734143,0.0007467566,0.0012610448,0.001919369,0.0013884783,0.5412038],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013584194,0.000006409459,0.00012023932,0.00005522615,0.0000020923164,0.000023871762,0.000027001846,0.00006516627,0.00004795853,0.0020464004,0.96980226,0.027789827],"study_design_scores_gemma":[0.0000025953254,0.0000024130538,0.0004964552,0.00003585006,0.0000011498239,0.000010475203,0.000035629095,0.000026919166,0.000023274435,0.00022220961,0.99914086,0.000002146495],"about_ca_topic_score_codex":0.26613382,"about_ca_topic_score_gemma":0.5959715,"teacher_disagreement_score":0.7338662,"about_ca_system_score_codex":0.0069407546,"about_ca_system_score_gemma":0.009597461,"threshold_uncertainty_score":0.5291695},"labels":[],"label_agreement":null},{"id":"W7043002229","doi":"","title":"Progress toward finalizing the 2005 National Model Construction Codes","year":2003,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Commission; Process (computing); Code (set theory); Key (lock); Point (geometry); Building code","score_opus":0.1456260375283659,"score_gpt":0.37637022102755163,"score_spread":0.23074418349918574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7043002229","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1086522,0.004492806,0.46010128,0.16780537,0.010972324,0.004200052,0.0040171463,0.0037724732,0.23598629],"genre_scores_gemma":[0.1611139,0.0027852699,0.76128316,0.011036613,0.00075406884,0.0028411902,0.009391177,0.0014216109,0.049373038],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.8403959,0.046460498,0.0153984,0.0061153686,0.08449019,0.0071396246],"domain_scores_gemma":[0.48916668,0.07241063,0.016065417,0.05866211,0.352343,0.011352198],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.23351896,0.0013121095,0.0013163803,0.008124686,0.0068710335,0.014737965,0.010446378,0.0068019438,0.0101659],"category_scores_gemma":[0.33945736,0.0014743914,0.0026629253,0.007033545,0.005263111,0.0077150143,0.007705183,0.009492445,0.00367062],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001795757,0.0008245536,0.0066158157,0.0017478579,0.000087662345,0.0004227568,0.011617213,0.022224214,0.0036583114,0.3315647,0.28055924,0.3404981],"study_design_scores_gemma":[0.000111922855,0.00042702147,0.012477284,0.004663971,0.00009153967,0.00036308233,0.008859359,0.01717842,0.0077034165,0.033538323,0.91421646,0.0003692304],"about_ca_topic_score_codex":0.234918,"about_ca_topic_score_gemma":0.20716517,"teacher_disagreement_score":0.234918,"about_ca_system_score_codex":0.053319465,"about_ca_system_score_gemma":0.16848104,"threshold_uncertainty_score":0.9452076},"labels":[],"label_agreement":null},{"id":"W7043549854","doi":"","title":"A Technical and Financial Evaluation of a Polymetallic Project in New Brunswick, Canada","year":2016,"lang":"en","type":"dissertation","venue":"Spiral (Imperial College London)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Financial Audit; Financial plan; Financial analysis; Government (linguistics); Program evaluation","score_opus":0.04797919576691478,"score_gpt":0.3439916306585448,"score_spread":0.29601243489163004,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7043549854","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9781748,0.00022250086,0.0002475012,0.0006013766,0.000012515559,0.00018453429,0.0010222808,0.000018802672,0.019515822],"genre_scores_gemma":[0.9771311,0.0003979528,0.00058304996,0.000087476255,0.0000032189969,0.000045449695,0.0008012832,0.000012768709,0.020937746],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99781394,0.00020750897,0.00006540865,0.00011542565,0.0011125691,0.00068514375],"domain_scores_gemma":[0.9957569,0.00030172488,0.00017377605,0.000065670414,0.0028488098,0.00085309334],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012571112,0.00047256873,0.0003632791,0.002848838,0.0049859304,0.0023809886,0.0012360252,0.0007197699,0.0026276645],"category_scores_gemma":[0.0030558128,0.000353399,0.00028686694,0.0044851447,0.001360492,0.00055259163,0.0012318034,0.00091571634,0.00031154382],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003107275,0.002351452,0.62953395,0.00063320284,0.0002513597,0.010710487,0.025657877,0.039655056,0.01559687,0.017348658,0.02430134,0.23085253],"study_design_scores_gemma":[0.00008554596,0.0008357087,0.8837184,0.00017330948,0.00006604613,0.00026602735,0.058353756,0.012906201,0.0041974853,0.00072010857,0.03853781,0.00013971263],"about_ca_topic_score_codex":0.9900283,"about_ca_topic_score_gemma":0.996829,"teacher_disagreement_score":0.09099188,"about_ca_system_score_codex":0.09099188,"about_ca_system_score_gemma":0.093971886,"threshold_uncertainty_score":0.66019535},"labels":[],"label_agreement":null},{"id":"W7044244227","doi":"","title":"World technical assessments will benefit exporters of innovative construction products","year":2001,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Technical progress; Product (mathematics); Production (economics); Work (physics)","score_opus":0.08056095679779406,"score_gpt":0.37639708697887836,"score_spread":0.2958361301810843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7044244227","genre_codex":"empirical","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7890165,0.0010072408,0.07065521,0.008831319,0.0003157658,0.00025410074,0.0018329448,0.0006530785,0.12743387],"genre_scores_gemma":[0.92467326,0.00075481314,0.039453495,0.00038294098,0.00004354022,0.00013874263,0.0011684722,0.00012968681,0.033255026],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99725634,0.0013218637,0.00015660012,0.0001980623,0.00085955777,0.00020764314],"domain_scores_gemma":[0.98937184,0.0034477757,0.0010342705,0.0013134205,0.0045902748,0.0002424075],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0069209244,0.0008165657,0.00034368868,0.0012231673,0.0014071915,0.0035601265,0.0004791764,0.0011554236,0.009016785],"category_scores_gemma":[0.022733945,0.000206064,0.00050265115,0.0011606279,0.0008173754,0.0036153432,0.0012892798,0.00083469565,0.0012380058],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012236825,0.00041364125,0.21243612,0.0003887001,0.0001279721,0.0009278208,0.0037045623,0.023476435,0.017994888,0.057219516,0.019917509,0.6621693],"study_design_scores_gemma":[0.0002542729,0.0018420706,0.4026725,0.0009566872,0.0005457102,0.0010210129,0.02431605,0.083090134,0.07377193,0.06362129,0.3475853,0.0003230216],"about_ca_topic_score_codex":0.025442993,"about_ca_topic_score_gemma":0.04660074,"teacher_disagreement_score":0.025442993,"about_ca_system_score_codex":0.0019679188,"about_ca_system_score_gemma":0.004806725,"threshold_uncertainty_score":0.0505898},"labels":[],"label_agreement":null},{"id":"W7045707676","doi":"","title":"Belarusian emigration to the USA and Canada (1940's – 1960's): problems of cultural and national identification in a foreign-language environment / O. Brigadina","year":2024,"lang":"ru","type":"article","venue":"Digital Library of the Belarusian State University (Belarusian State University)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Emigration; Identification (biology); Immigration; Government (linguistics)","score_opus":0.014956314395743683,"score_gpt":0.2069771573372736,"score_spread":0.1920208429415299,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045707676","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97862554,0.0044276114,0.00013004367,0.0028419215,0.00006655848,0.000011599246,0.00022266433,0.00000587439,0.013668198],"genre_scores_gemma":[0.9965569,0.0013199757,0.000064839754,0.00010800934,0.000010134126,0.000004727418,0.00008270085,0.0000033390193,0.001849428],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991732,0.00014941713,0.00003243976,0.00008798653,0.0000905839,0.00046627643],"domain_scores_gemma":[0.99911994,0.0001230552,0.00025117965,0.000035406585,0.00027619276,0.00019417175],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012222781,0.00017476032,0.00032300816,0.0020920727,0.0039574425,0.0019242704,0.0004912824,0.0003688554,0.0025874597],"category_scores_gemma":[0.0014843605,0.00022038707,0.0002453606,0.0033746876,0.0029279345,0.00094741816,0.0019202176,0.00079849135,0.00022463109],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004192074,0.0001509759,0.6710138,0.00035925696,0.00014171854,0.0018718512,0.1359508,0.001132301,0.0009526546,0.041661955,0.012884786,0.13346072],"study_design_scores_gemma":[0.0000067352767,0.000058163332,0.9228744,0.000186839,0.00002760647,0.00015710031,0.037933912,0.00014140707,0.00012764202,0.00037029068,0.038100675,0.000015295722],"about_ca_topic_score_codex":0.75383663,"about_ca_topic_score_gemma":0.864939,"teacher_disagreement_score":0.24616337,"about_ca_system_score_codex":0.011542748,"about_ca_system_score_gemma":0.014541078,"threshold_uncertainty_score":0.49522614},"labels":[],"label_agreement":null},{"id":"W7046042192","doi":"","title":"Construction forum endorses plan : industry views innovation as key to progress","year":2003,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Key (lock); Plan (archaeology); Work (physics)","score_opus":0.1149115437527256,"score_gpt":0.37847572370060206,"score_spread":0.26356417994787645,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7046042192","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0041347076,0.00036103878,0.0025377758,0.14336616,0.021121582,0.00047488822,0.0052177855,0.0012089536,0.82157713],"genre_scores_gemma":[0.025318706,0.00033263207,0.0026779007,0.013572578,0.0026354261,0.0003847796,0.0028177963,0.00056002825,0.9517001],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.98977685,0.0008755402,0.00033744427,0.00069550786,0.0069777602,0.001336939],"domain_scores_gemma":[0.9705906,0.006944863,0.00051958073,0.0026058133,0.015824648,0.003514441],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008523581,0.000746625,0.0009445011,0.0020159895,0.0052263397,0.011561855,0.002019012,0.019063847,0.25092447],"category_scores_gemma":[0.034138754,0.00079313107,0.000677324,0.0024384905,0.001972451,0.0046010474,0.0033167657,0.010089501,0.08510296],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011473387,0.00009680486,0.00045651672,0.00007483796,0.0000051376132,0.0000715185,0.00026637324,0.00006225189,0.0004130309,0.021901794,0.96432996,0.012206988],"study_design_scores_gemma":[0.00008207926,0.00005583995,0.00224337,0.00008724735,0.00001730054,0.000037877187,0.00047798193,0.00028196524,0.0006429972,0.004374756,0.9916715,0.000027063383],"about_ca_topic_score_codex":0.03592621,"about_ca_topic_score_gemma":0.07790598,"teacher_disagreement_score":0.25092447,"about_ca_system_score_codex":0.005024796,"about_ca_system_score_gemma":0.03458603,"threshold_uncertainty_score":0.839426},"labels":[],"label_agreement":null},{"id":"W7066801240","doi":"","title":"La complexité sociale en contexte de projets majeurs : étude de trois projets d'infrastructure","year":2023,"lang":"fr","type":"other","venue":"Archipelago (University of Quebec in Montreal)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Zea mays; Institutional change","score_opus":0.022144930773735777,"score_gpt":0.2720522722051941,"score_spread":0.24990734143145835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7066801240","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94589627,0.0008556472,0.013663383,0.0033865331,0.000058359947,0.00018456431,0.00024149235,0.00007139508,0.03564236],"genre_scores_gemma":[0.9884925,0.0005609689,0.0054094344,0.00014392151,0.000013566251,0.00019364095,0.00010921127,0.000031442436,0.0050453264],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99169934,0.0045578633,0.00034744403,0.00090425916,0.0016443232,0.0008467407],"domain_scores_gemma":[0.97628003,0.014666477,0.0030202465,0.0012885941,0.0028756633,0.0018689791],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008474158,0.00040923926,0.0004269602,0.0024254,0.0050571114,0.008261715,0.0012761124,0.0011771786,0.006707138],"category_scores_gemma":[0.021669785,0.00042832785,0.0006997862,0.0041115927,0.005415911,0.0068719904,0.005835588,0.0019458076,0.00064642815],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011942498,0.00022404554,0.19543572,0.0010992144,0.00015596168,0.0014741253,0.6113901,0.0025917748,0.0025410613,0.06824225,0.003514026,0.11321228],"study_design_scores_gemma":[0.000015575999,0.00024309965,0.22529255,0.0007777416,0.00007891624,0.0005161738,0.661856,0.0027091238,0.0011454306,0.018464958,0.08880451,0.0000959726],"about_ca_topic_score_codex":0.020258443,"about_ca_topic_score_gemma":0.03225362,"teacher_disagreement_score":0.020258443,"about_ca_system_score_codex":0.007380176,"about_ca_system_score_gemma":0.010090596,"threshold_uncertainty_score":0.053547144},"labels":[],"label_agreement":null},{"id":"W7067497535","doi":"","title":"Megaproject management – case studies of Torino, Vancouver and Milano Winter Olympic Games","year":2021,"lang":"en","type":"article","venue":"CeON Repository (Centre for Evaluation in Education and Science)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Megaproject; Project management; Order (exchange); Work (physics)","score_opus":0.06594451124625635,"score_gpt":0.41010623487463765,"score_spread":0.3441617236283813,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7067497535","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.986078,0.00039902196,0.0006032454,0.00021748783,0.000009823098,0.00023718139,0.000069919646,0.0000081410635,0.012377085],"genre_scores_gemma":[0.9896751,0.0007216657,0.0015271151,0.000037475158,0.000011005158,0.00015962424,0.00011872973,0.000008998687,0.0077402946],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.997451,0.0010037872,0.000099711026,0.00017578546,0.0005763597,0.00069330103],"domain_scores_gemma":[0.9973889,0.000706609,0.00037793297,0.000097500175,0.00042674772,0.0010023142],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001918947,0.0006562506,0.0004270717,0.0016196558,0.0053000846,0.0026040012,0.0019069458,0.0016416814,0.002205776],"category_scores_gemma":[0.002784941,0.000405596,0.00029050463,0.003663853,0.0019984741,0.00077240716,0.001827835,0.00095319154,0.00031635005],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002436741,0.0100677265,0.29001182,0.0031657172,0.00035064478,0.15955247,0.20006217,0.06284033,0.007248848,0.026253117,0.022135042,0.21587542],"study_design_scores_gemma":[0.0001814899,0.002587815,0.39765266,0.00072897156,0.0001004591,0.009496649,0.4623251,0.019392408,0.0039737104,0.0027200726,0.10066895,0.00017160871],"about_ca_topic_score_codex":0.12878302,"about_ca_topic_score_gemma":0.35268706,"teacher_disagreement_score":0.871217,"about_ca_system_score_codex":0.008777432,"about_ca_system_score_gemma":0.004072901,"threshold_uncertainty_score":0.25606686},"labels":[],"label_agreement":null},{"id":"W7072117783","doi":"","title":"What we're hearing: Europe is taking steps toward achieving a sustainable and competititve construction sector","year":2007,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Construction industry; Sustainable development; Work (physics); Sustainability; Production (economics)","score_opus":0.10409072460875353,"score_gpt":0.3470529049911205,"score_spread":0.242962180382367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7072117783","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.047014657,0.02924871,0.004465207,0.82704604,0.01333748,0.000023368111,0.00035583085,0.00014882893,0.07835987],"genre_scores_gemma":[0.44011867,0.022885941,0.0075516193,0.4519997,0.0046703834,0.00006145289,0.0004492687,0.00021682661,0.072046205],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99495417,0.0008772775,0.00024959072,0.00043709914,0.0014092351,0.0020727061],"domain_scores_gemma":[0.9926991,0.0015522308,0.0008917942,0.00048263275,0.0018405048,0.0025336873],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01053247,0.0005534542,0.0007211139,0.0010715041,0.006763364,0.022684429,0.0012464391,0.01354707,0.0120827],"category_scores_gemma":[0.010448596,0.00030917316,0.0008452297,0.002095135,0.006289112,0.0143442275,0.0058309236,0.009401028,0.001578767],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036963433,0.00026765728,0.011678685,0.00074806385,0.0001793004,0.0015849001,0.011555216,0.0009964943,0.0049492973,0.30253658,0.4486255,0.21650872],"study_design_scores_gemma":[0.00002612997,0.00006213439,0.010360849,0.0006530849,0.000044005625,0.00027347475,0.014572628,0.00013654745,0.0006608727,0.028290167,0.94483244,0.00008761952],"about_ca_topic_score_codex":0.03105777,"about_ca_topic_score_gemma":0.036333624,"teacher_disagreement_score":0.03105777,"about_ca_system_score_codex":0.0037213394,"about_ca_system_score_gemma":0.016388213,"threshold_uncertainty_score":0.06175399},"labels":[],"label_agreement":null},{"id":"W7072349496","doi":"","title":"What we're hearing : Canada and Taiwan share research interest in construction technologies","year":2004,"lang":"en","type":"article","venue":"NPARC","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Emerging technologies; Information technology; Government (linguistics)","score_opus":0.2446021516308738,"score_gpt":0.39554115412963814,"score_spread":0.15093900249876435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7072349496","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034700975,0.0048091374,0.0002399927,0.93953836,0.0029199591,0.000014427452,0.00029051086,0.000035559813,0.017451169],"genre_scores_gemma":[0.42736435,0.0066439207,0.000695792,0.48753142,0.0022362114,0.000064748805,0.00036236006,0.00014742192,0.07495376],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99336034,0.00061237585,0.00017779191,0.00046305984,0.002073303,0.0033131908],"domain_scores_gemma":[0.9663729,0.006304499,0.002204307,0.0009787767,0.011952957,0.012186459],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006280482,0.00035684372,0.00071669905,0.0023083691,0.02167248,0.017986272,0.0016443039,0.0131772505,0.014866825],"category_scores_gemma":[0.018620843,0.0004553213,0.0006028909,0.006648387,0.012604748,0.008866954,0.0059124758,0.015228572,0.0014178089],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023725134,0.00012084446,0.044622928,0.00032906214,0.00014327758,0.0014692898,0.089071184,0.00016957658,0.001960607,0.043604214,0.7557222,0.06254953],"study_design_scores_gemma":[0.000048808477,0.000045883557,0.04957924,0.000429393,0.00007832593,0.00024049704,0.2993948,0.00010967819,0.00047518025,0.005402207,0.6439907,0.00020526299],"about_ca_topic_score_codex":0.884743,"about_ca_topic_score_gemma":0.93631166,"teacher_disagreement_score":0.115257025,"about_ca_system_score_codex":0.035090927,"about_ca_system_score_gemma":0.12226924,"threshold_uncertainty_score":0.25460368},"labels":[],"label_agreement":null},{"id":"W7084401142","doi":"10.5281/zenodo.17246606","title":"ltelab/disdrodb: v0.2.0","year":2025,"lang":"en","type":"other","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Summit Pacific College","funders":"","keywords":"Process (computing); Disdrometer; Work (physics); Core (optical fiber)","score_opus":0.08196169949218697,"score_gpt":0.3289467047396673,"score_spread":0.24698500524748035,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7084401142","genre_codex":"software","genre_gemma":"software","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"software","genre_consensus":"software","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002389863,0.00019658878,0.16852723,0.00019018147,0.00015549287,0.00018059417,0.091254696,0.71258175,0.024523601],"genre_scores_gemma":[0.0385106,0.0003592166,0.12896153,0.0009370533,0.00018531816,0.00082167337,0.43284267,0.3563692,0.041012734],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985421,0.00018424414,0.000118325384,0.00022262863,0.0006657184,0.00026697302],"domain_scores_gemma":[0.99773335,0.00035829784,0.00019001753,0.00078150444,0.00076527125,0.00017147591],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021317168,0.0021757104,0.0008700863,0.0025589839,0.00056398305,0.0024891177,0.002939233,0.0010509839,0.096247025],"category_scores_gemma":[0.004708958,0.0015673006,0.0010768027,0.0023014687,0.0004942922,0.0019755098,0.0019147906,0.0015991993,0.12770931],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048813608,0.000060434904,0.0018913513,0.00046265623,0.00012063816,0.00012824388,0.00018214619,0.0039821854,0.011293952,0.0070949756,0.9059421,0.06835312],"study_design_scores_gemma":[0.00026876514,0.00008058365,0.0033459067,0.00011719777,0.000072213916,0.0002869677,0.00005967483,0.025711486,0.051127363,0.00930136,0.90943474,0.0001937616],"about_ca_topic_score_codex":0.008761599,"about_ca_topic_score_gemma":0.007622173,"teacher_disagreement_score":0.096247025,"about_ca_system_score_codex":0.001180693,"about_ca_system_score_gemma":0.0017101916,"threshold_uncertainty_score":0.32197833},"labels":[],"label_agreement":null},{"id":"W7084627432","doi":"","title":"Management and Treatment of Benign Prostatic Hyperplasia Symptoms: Current Insights","year":2025,"lang":"en","type":"article","venue":"DOAJ (DOAJ: Directory of Open Access Journals)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Lower urinary tract symptoms; Hyperplasia; Benign prostatic hyperplasia (BPH); Quality of life (healthcare); Prostate; Prostate disease; Patient care; Urinary system; Quality management","score_opus":0.30393140586963796,"score_gpt":0.5870206886382352,"score_spread":0.28308928276859724,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7084627432","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00024096845,0.9971463,0.00016084124,0.0013633135,0.0002236832,0.0000063603015,0.000019999487,0.0000074110753,0.0008311426],"genre_scores_gemma":[0.0019672762,0.99618787,0.0004080565,0.0007483848,0.00043675635,0.000010912058,0.00003514835,0.000002702359,0.00020291511],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99942374,0.00012457637,0.00011620481,0.00008664216,0.00019949004,0.00004944505],"domain_scores_gemma":[0.99886286,0.0006836597,0.00013179192,0.000020723232,0.000252817,0.000048171656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013483776,0.00050381676,0.001122917,0.0012670332,0.00030145643,0.0013948792,0.0008261112,0.0009935123,0.0031869628],"category_scores_gemma":[0.0024731655,0.00025467062,0.0009412007,0.0009700657,0.0005411209,0.0016120563,0.00065564417,0.0019774137,0.00083045446],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014028994,0.0001095302,0.0005052743,0.017629076,0.00011170529,0.00014828835,0.00011549755,0.00026227487,0.00049468264,0.0028563845,0.016380046,0.96124697],"study_design_scores_gemma":[0.00011680537,0.00055986,0.003297234,0.038574755,0.000622809,0.0026553676,0.00048987253,0.00047836563,0.00059757626,0.00704038,0.94550765,0.000059316142],"about_ca_topic_score_codex":0.0016845064,"about_ca_topic_score_gemma":0.0034378492,"teacher_disagreement_score":0.0031869628,"about_ca_system_score_codex":0.0006612552,"about_ca_system_score_gemma":0.0014973497,"threshold_uncertainty_score":0.010661483},"labels":[],"label_agreement":null},{"id":"W7088292230","doi":"10.6084/m9.figshare.30334888.v1","title":"Additional file 2 of “What are you afraid of?” A mixed methods exploration of serious illness communication with oncology patients on general internal medicine wards in Canada","year":2025,"lang":"en","type":"article","venue":"Figshare","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto; University Health Network","funders":"","keywords":"MEDLINE; Internal communications; Palliative care; Continuity of care","score_opus":0.07908903070788623,"score_gpt":0.3782154924492225,"score_spread":0.2991264617413363,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7088292230","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017136518,0.00004181315,0.00035899,0.0004068196,0.000060224775,0.0009864244,0.99015033,0.00014742363,0.0061343564],"genre_scores_gemma":[0.072585985,0.0006386038,0.016633108,0.0022595895,0.00016073149,0.04938447,0.76104486,0.0012557603,0.09603688],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99776363,0.0005339367,0.00025338406,0.00025750222,0.0007209232,0.000470624],"domain_scores_gemma":[0.921888,0.05353525,0.0023447876,0.0028499577,0.017074183,0.0023079321],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0035128638,0.00086351525,0.0012529781,0.0053471397,0.004029262,0.0037282398,0.0026391402,0.0014576308,0.8079985],"category_scores_gemma":[0.061448578,0.0009818292,0.0017392468,0.009414818,0.00092682673,0.0017342673,0.0019682953,0.0013669039,0.078131795],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013212935,0.00014010837,0.0054954,0.0017090561,0.00003785703,0.00005266555,0.00089067646,0.00033618667,0.000012932542,0.00084409263,0.9811412,0.009207698],"study_design_scores_gemma":[0.005186441,0.00019533014,0.17140757,0.010173232,0.00032130288,0.0002656267,0.022264179,0.0028364956,0.0002862907,0.008960495,0.7777868,0.00031624496],"about_ca_topic_score_codex":0.7438143,"about_ca_topic_score_gemma":0.8668567,"teacher_disagreement_score":0.8079985,"about_ca_system_score_codex":0.0132911615,"about_ca_system_score_gemma":0.04268795,"threshold_uncertainty_score":0.51538885},"labels":[],"label_agreement":null},{"id":"W7093640773","doi":"","title":"Project Planning","year":2000,"lang":"","type":"article","venue":"PDXScholar  (Portland State University)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Project planning; Project management; Schedule; Product (mathematics); Project management triangle; Investment (military); Product cost management; Quarter (Canadian coin)","score_opus":0.06248817184898885,"score_gpt":0.30681580930730773,"score_spread":0.24432763745831887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7093640773","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032307338,0.00073655165,0.046737675,0.0022754897,0.00047603832,0.0025957236,0.008054305,0.002075678,0.93381786],"genre_scores_gemma":[0.086386934,0.0019691607,0.070585154,0.00048306503,0.00014431446,0.0029315797,0.014824559,0.00076139346,0.82191384],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99793506,0.00047405157,0.00013489302,0.000212172,0.0010043811,0.00023940718],"domain_scores_gemma":[0.9972777,0.00028405836,0.00012803171,0.0003408728,0.0014422991,0.0005271026],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0025578823,0.0007666755,0.00027034228,0.0027502782,0.0016057281,0.003147406,0.0015641818,0.00061041024,0.30165562],"category_scores_gemma":[0.0038830047,0.00041236408,0.00039177202,0.002205303,0.000404753,0.0010936434,0.0016860733,0.0009958185,0.117948264],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008694842,0.00015156988,0.0008577668,0.00036951437,0.000007802934,0.00011552369,0.0003230567,0.004898537,0.0007092981,0.042891264,0.46205077,0.48753795],"study_design_scores_gemma":[0.000020909476,0.000099445875,0.0016861946,0.00022083323,0.0000045355964,0.00007074367,0.00029882355,0.0015474703,0.0007690018,0.008661685,0.9866043,0.000015998694],"about_ca_topic_score_codex":0.008264896,"about_ca_topic_score_gemma":0.0123602105,"teacher_disagreement_score":0.30165562,"about_ca_system_score_codex":0.0030839765,"about_ca_system_score_gemma":0.00906198,"threshold_uncertainty_score":0.9961035},"labels":[],"label_agreement":null},{"id":"W7093722290","doi":"","title":"9781000609547.pdf","year":2022,"lang":"en","type":"other","venue":"OAPEN (The OAPEN Foundation)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Civil servants; Corporate governance; Norwegian; Field (mathematics); Bridging (networking); Public management","score_opus":0.07006350233112045,"score_gpt":0.3602159022443731,"score_spread":0.29015239991325265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7093722290","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00018656725,0.0007253441,0.0010535403,0.0005414833,0.00071602693,0.000042546988,0.0026410203,0.0009535382,0.9931399],"genre_scores_gemma":[0.00080844644,0.0009543691,0.0008399597,0.00017811744,0.00010962074,0.00004811145,0.0023107508,0.0007657737,0.9939849],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99928373,0.00008505886,0.000044830824,0.00011104299,0.00040346663,0.00007195016],"domain_scores_gemma":[0.9986815,0.00030284058,0.000077649456,0.00018809752,0.0004231799,0.00032669888],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0007962184,0.0011349892,0.00067512156,0.0022435274,0.0012600553,0.01060425,0.0012852516,0.0022568936,0.8874767],"category_scores_gemma":[0.003256818,0.0005197077,0.000581895,0.004350585,0.0007251343,0.0044094976,0.0039461977,0.0017924409,0.87322766],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022345355,0.000028016477,0.000116456446,0.00026012334,0.0000030914782,0.000045442936,0.00009364314,0.00011402604,0.00024153225,0.008295683,0.7523407,0.23843904],"study_design_scores_gemma":[0.000002136131,0.00000386414,0.00012089727,0.000088862005,6.1582733e-7,0.000032991295,0.000042309537,0.000023389379,0.00005166707,0.0006762367,0.99895394,0.000003129049],"about_ca_topic_score_codex":0.002261723,"about_ca_topic_score_gemma":0.0029679367,"teacher_disagreement_score":0.11252332,"about_ca_system_score_codex":0.0011753018,"about_ca_system_score_gemma":0.0013529551,"threshold_uncertainty_score":0.16050076},"labels":[],"label_agreement":null},{"id":"W7094275492","doi":"","title":"INVESTIGATION ON THE INTERPRETATION OF ”SMALL DEVIATION”","year":2017,"lang":"sv","type":"article","venue":"KTH Publication Database DiVA (KTH Royal Institute of Technology)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Interpretation (philosophy); Work (physics); Term (time); Plan (archaeology); Quarter (Canadian coin); Monopoly","score_opus":0.11227372852153647,"score_gpt":0.331029020402034,"score_spread":0.21875529188049755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7094275492","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7076674,0.004075143,0.0554717,0.038017347,0.0011710697,0.000915129,0.00042032613,0.00020180685,0.19205996],"genre_scores_gemma":[0.9902395,0.00038268857,0.0040219286,0.002388592,0.00007473827,0.00033390027,0.000098422686,0.0000763945,0.0023838312],"study_design_codex":"qualitative","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.8274247,0.124972135,0.011432035,0.008568354,0.024422899,0.0031798808],"domain_scores_gemma":[0.6578193,0.2659789,0.03407933,0.01827252,0.021342112,0.0025078082],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0684804,0.00055998174,0.0008267345,0.0031999468,0.0077601504,0.011751404,0.003937215,0.004007624,0.00400779],"category_scores_gemma":[0.20405886,0.00064828986,0.000749849,0.0052441573,0.037173368,0.00862948,0.014292545,0.008863209,0.0006164423],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019608496,0.00006722742,0.022252956,0.0008071304,0.000042523265,0.0020747522,0.65750635,0.00041627345,0.0016671475,0.2713951,0.0060301884,0.037544277],"study_design_scores_gemma":[0.00005384376,0.00020175404,0.026476631,0.003099925,0.000073815,0.0019635002,0.7417335,0.0015112,0.0036590875,0.09313932,0.12791811,0.00016928648],"about_ca_topic_score_codex":0.0074832398,"about_ca_topic_score_gemma":0.008337292,"teacher_disagreement_score":0.0684804,"about_ca_system_score_codex":0.008261836,"about_ca_system_score_gemma":0.010043864,"threshold_uncertainty_score":0.3621633},"labels":[],"label_agreement":null},{"id":"W7095333621","doi":"","title":"Executive summary","year":2004,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Relevance (law); Set (abstract data type); Work (physics); Executive summary; Elite; Code (set theory)","score_opus":0.09011247749102862,"score_gpt":0.3710353513761855,"score_spread":0.28092287388515685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7095333621","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00086864905,0.007286536,0.0012292402,0.03903829,0.030926105,0.00083013915,0.01809069,0.0009423648,0.90078807],"genre_scores_gemma":[0.0034430698,0.005160511,0.0005361857,0.009165133,0.0034017223,0.00040726992,0.008568558,0.00021122176,0.9691064],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9975871,0.00023949747,0.00021072762,0.00035041996,0.0012268359,0.00038546012],"domain_scores_gemma":[0.9921969,0.0007250235,0.0003855364,0.00057581026,0.005273391,0.0008433817],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0024582082,0.00068061985,0.0007626623,0.0023969247,0.0015205829,0.0063849287,0.0018208823,0.0033884416,0.4841725],"category_scores_gemma":[0.011431054,0.00041279182,0.00052177976,0.0033406056,0.00037492393,0.003018146,0.0014643352,0.0025004,0.45938727],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016213773,0.000008991259,0.00010055161,0.00013297227,0.0000015043452,0.000025540538,0.000015845735,0.000026245143,0.000055658977,0.0026224256,0.9664452,0.030548798],"study_design_scores_gemma":[0.0000026944504,0.000005451106,0.00035224066,0.00011548915,0.0000010506495,0.000013770606,0.00002849189,0.000012302112,0.000023649774,0.00027199902,0.99917054,0.0000023420398],"about_ca_topic_score_codex":0.0059567927,"about_ca_topic_score_gemma":0.0050215195,"teacher_disagreement_score":0.51582754,"about_ca_system_score_codex":0.0020003496,"about_ca_system_score_gemma":0.007701719,"threshold_uncertainty_score":0.73576534},"labels":[],"label_agreement":null},{"id":"W7096324789","doi":"","title":"Geometry","year":2013,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Gray (unit)","score_opus":0.09834385263783796,"score_gpt":0.36794620044138937,"score_spread":0.2696023478035514,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096324789","genre_codex":"dataset","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004865409,0.00051723566,0.003824432,0.00040352563,0.00017065587,0.00012423698,0.9686686,0.0023570722,0.01906883],"genre_scores_gemma":[0.013631326,0.00030398,0.0058037457,0.00013855929,0.000024389712,0.00011695557,0.97407055,0.00038706197,0.0055234153],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99875236,0.000099049605,0.000044989432,0.0002784588,0.00061727146,0.0002077473],"domain_scores_gemma":[0.9980286,0.00015919772,0.000065269596,0.00037154634,0.001211384,0.00016395432],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00047596337,0.0018509702,0.0009917321,0.003306298,0.0017557257,0.0021088356,0.0031916532,0.0014516148,0.041397497],"category_scores_gemma":[0.0033494842,0.0005368221,0.0013757417,0.0055743637,0.00079620513,0.0008096911,0.0014473854,0.0018580501,0.03737213],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010292637,0.000044370663,0.0026870288,0.00023830798,0.000040577142,0.00011066783,0.000060022852,0.0048721354,0.000575509,0.002685291,0.96691877,0.021664295],"study_design_scores_gemma":[0.000081393504,0.000027125903,0.014534879,0.00021288291,0.000032002205,0.00031055915,0.00038786072,0.0116465585,0.0015635543,0.003433201,0.9676991,0.0000709008],"about_ca_topic_score_codex":0.63954896,"about_ca_topic_score_gemma":0.8035843,"teacher_disagreement_score":0.9586025,"about_ca_system_score_codex":0.0044556814,"about_ca_system_score_gemma":0.0057296897,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W7096325827","doi":"","title":"An Innovative Approach to the Development of Project Management Processes for Small-scale Projects in a large Engineering Company","year":2016,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Project planning; Project management; Project management triangle; Program management; OPM3; Extreme project management; Process (computing); Project charter","score_opus":0.11554675492358354,"score_gpt":0.3502592884340043,"score_spread":0.23471253351042073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096325827","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12252443,0.00020031421,0.8499411,0.0014014113,0.00010241592,0.0029333227,0.000048243877,0.0011091416,0.02173971],"genre_scores_gemma":[0.1365123,0.00010428654,0.85965514,0.00011172393,0.000016787839,0.0006459697,0.0000455228,0.00004199308,0.0028662642],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9938257,0.0029981653,0.00026182862,0.00052331836,0.0020502333,0.00034083205],"domain_scores_gemma":[0.99454206,0.0021927655,0.0005458724,0.0007504136,0.0014994331,0.0004695359],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0061060847,0.0005768451,0.00031171227,0.001297282,0.0018096906,0.0033363504,0.0019209938,0.0010913678,0.002322612],"category_scores_gemma":[0.006876411,0.0005183719,0.0007032868,0.0010442303,0.0013517071,0.0016328931,0.0024983552,0.0014699692,0.0005285149],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042750873,0.0042812955,0.0073999832,0.0010179001,0.00011126184,0.001636989,0.010296184,0.048601266,0.0668634,0.077414095,0.0053444817,0.7766056],"study_design_scores_gemma":[0.0011591841,0.0067061977,0.01692334,0.0010333617,0.000439319,0.0040141065,0.011252306,0.57742697,0.07666039,0.05350241,0.25043178,0.00045073975],"about_ca_topic_score_codex":0.003566682,"about_ca_topic_score_gemma":0.006521301,"teacher_disagreement_score":0.0061060847,"about_ca_system_score_codex":0.0028947515,"about_ca_system_score_gemma":0.010707806,"threshold_uncertainty_score":0.032292426},"labels":[],"label_agreement":null},{"id":"W7096548588","doi":"","title":"Measuring and Classifying Construction Field Rework: A Pilot Study, are all available on the","year":2003,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Rework; Field (mathematics); Data collection; Field research; Work (physics)","score_opus":0.40182754479214744,"score_gpt":0.3542428387963679,"score_spread":0.04758470599577952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096548588","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9482429,0.00011410688,0.008998209,0.00031050877,0.000058665195,0.011751219,0.008842136,0.000373328,0.021308916],"genre_scores_gemma":[0.91025937,0.0003543522,0.045077104,0.00009572114,0.000024749108,0.010467052,0.009040412,0.00015077184,0.024530385],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9976229,0.0010116311,0.0002469227,0.0002446199,0.0007053506,0.00016859571],"domain_scores_gemma":[0.9859264,0.00537116,0.00089397625,0.0022373162,0.0046110125,0.0009601961],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0056135836,0.00046438104,0.00043329908,0.002650502,0.0014596136,0.0011396426,0.0010120769,0.00044825446,0.0143075455],"category_scores_gemma":[0.015636507,0.00038072653,0.00033037565,0.0022262237,0.0005690427,0.0010899911,0.0009406574,0.000629707,0.0036912814],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008585963,0.006786241,0.26003632,0.0007607169,0.00003172011,0.0003465347,0.028169852,0.0015750512,0.005453642,0.00072523317,0.023273598,0.6719825],"study_design_scores_gemma":[0.00025917994,0.0047651944,0.8799883,0.00029362465,0.000057914254,0.0002013345,0.066361345,0.0029302645,0.007101494,0.0009158648,0.037002645,0.00012273516],"about_ca_topic_score_codex":0.023603689,"about_ca_topic_score_gemma":0.057442307,"teacher_disagreement_score":0.023603689,"about_ca_system_score_codex":0.0016952358,"about_ca_system_score_gemma":0.003208483,"threshold_uncertainty_score":0.047863543},"labels":[],"label_agreement":null},{"id":"W7096743794","doi":"","title":"University of Alberta A Fuzzy Consensus Building Framework for Early Alignment of Construction Project Teams on the Extent of their Roles and Responsibilities","year":2016,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Permission; Work (physics); Government (linguistics); Field (mathematics); Process (computing); Fuzzy logic","score_opus":0.052694725643382914,"score_gpt":0.3093348464789163,"score_spread":0.2566401208355334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096743794","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008776012,0.0008332084,0.96066713,0.0012230651,0.00010352061,0.00014469799,0.00024036827,0.0003034416,0.027708534],"genre_scores_gemma":[0.37277848,0.0009160312,0.60881543,0.0001629088,0.00005383239,0.0003310201,0.0005599934,0.00007502845,0.016307285],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9976985,0.0009507424,0.0001320706,0.00037155897,0.0006372426,0.00020999661],"domain_scores_gemma":[0.9966625,0.001470166,0.00020141275,0.0001917637,0.0011836104,0.00029060608],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0047415216,0.0008038549,0.0008001366,0.0021311399,0.0014171428,0.0037694208,0.002189623,0.0014516037,0.008774504],"category_scores_gemma":[0.008081784,0.00053724664,0.00075055566,0.0021275398,0.002059893,0.0014315465,0.0022682217,0.0013954205,0.001096472],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015210685,0.00006289361,0.0010054824,0.00020907892,0.00007171807,0.00022937766,0.0006961247,0.45916423,0.0014193509,0.39308324,0.0074475314,0.13645883],"study_design_scores_gemma":[0.000035831807,0.000052996143,0.00043909924,0.00018908734,0.000044830485,0.000036699836,0.0004645973,0.8247722,0.0009725519,0.1533731,0.01957958,0.00003945655],"about_ca_topic_score_codex":0.18386808,"about_ca_topic_score_gemma":0.14647788,"teacher_disagreement_score":0.18386808,"about_ca_system_score_codex":0.008942319,"about_ca_system_score_gemma":0.011088829,"threshold_uncertainty_score":0.3655957},"labels":[],"label_agreement":null},{"id":"W7096764509","doi":"","title":"Project Complexity Mapping in Five Dimensions for Complex Transportation Projects","year":2013,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Scope (computer science); Complexity management; Project management; Work (physics); Order (exchange)","score_opus":0.34488491133125765,"score_gpt":0.4020113466500507,"score_spread":0.05712643531879308,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096764509","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95845234,0.00012995266,0.03191307,0.0001581731,0.000008247412,0.00038006122,0.0002146398,0.000042402065,0.008701104],"genre_scores_gemma":[0.9721975,0.00004664809,0.027196206,0.000004893415,0.0000018723549,0.00016669484,0.00012963514,0.0000064903666,0.00025007877],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99661607,0.001854235,0.00023620253,0.00021400627,0.0008750533,0.00020456837],"domain_scores_gemma":[0.98570234,0.009456142,0.0016600414,0.00054427807,0.0021176722,0.0005195405],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038288366,0.00039987374,0.00030130672,0.005808339,0.0012495077,0.0028889505,0.00049886294,0.0003929692,0.0035852036],"category_scores_gemma":[0.017086864,0.00024832264,0.00063969544,0.004741987,0.0013169146,0.002048196,0.0026838826,0.0006760909,0.00013970626],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00096594344,0.0008002257,0.43450117,0.0010641563,0.00023486665,0.00063982775,0.03284332,0.07917956,0.004485252,0.05486078,0.0024298455,0.3879951],"study_design_scores_gemma":[0.000095331976,0.0008881524,0.6084327,0.0005041619,0.00015402118,0.00060881564,0.068833716,0.254067,0.0062941583,0.042392947,0.017500656,0.00022833736],"about_ca_topic_score_codex":0.00503362,"about_ca_topic_score_gemma":0.00616649,"teacher_disagreement_score":0.005808339,"about_ca_system_score_codex":0.0032787293,"about_ca_system_score_gemma":0.0021571745,"threshold_uncertainty_score":0.023788989},"labels":[],"label_agreement":null},{"id":"W7097193083","doi":"","title":"CONCRETETHINKING in transportation solutions CONCRETE HIGHWAYS A CASE STUDY OF PCCP SECTION OF","year":2004,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Section (typography); Highway system; Road construction; Government (linguistics); Highway maintenance; Asphalt","score_opus":0.14580888798583774,"score_gpt":0.36970140060227014,"score_spread":0.2238925126164324,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097193083","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9482075,0.00035537823,0.002846474,0.0005665167,0.000013088786,0.00018501775,0.00024879506,0.000028624876,0.047548607],"genre_scores_gemma":[0.98187375,0.00038785147,0.0051767016,0.000031669926,0.000007198226,0.000045215114,0.000185664,0.000011946255,0.01228003],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"case_report","domain_scores_codex":[0.99855787,0.0005292884,0.000028245931,0.00009659182,0.00042259964,0.00036542132],"domain_scores_gemma":[0.9984811,0.0006638396,0.00012120603,0.00012970342,0.00030587043,0.00029834846],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008872633,0.000341545,0.00018669174,0.0008467416,0.004074986,0.0021712058,0.00093446305,0.0019537907,0.004654854],"category_scores_gemma":[0.002422348,0.0002629411,0.00029651125,0.002450283,0.0018928915,0.0011306744,0.00091023557,0.00070799515,0.00038271217],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011349077,0.0029079304,0.106417246,0.0012394107,0.00014078578,0.08278073,0.062908016,0.18504477,0.019236118,0.2564339,0.035419587,0.24633668],"study_design_scores_gemma":[0.0003242262,0.0026207305,0.1442209,0.0008201589,0.00018395591,0.013412117,0.23774552,0.11850831,0.021500016,0.025797542,0.43465224,0.00021430687],"about_ca_topic_score_codex":0.23143668,"about_ca_topic_score_gemma":0.50303066,"teacher_disagreement_score":0.23143668,"about_ca_system_score_codex":0.007771151,"about_ca_system_score_gemma":0.004554572,"threshold_uncertainty_score":0.4601791},"labels":[],"label_agreement":null},{"id":"W7097536977","doi":"","title":"Suggestions for Improving Measurement Plans:","year":2014,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Viewpoints; Interview; Set (abstract data type); Control (management); Quality (philosophy); Cost contingency; Data collection; Performance measurement","score_opus":0.1625284666877917,"score_gpt":0.3582024873969813,"score_spread":0.1956740207091896,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097536977","genre_codex":"commentary","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01398256,0.010784024,0.15769814,0.7699675,0.008483982,0.014422618,0.001683164,0.0033857652,0.01959225],"genre_scores_gemma":[0.06486832,0.009535749,0.83204675,0.044697765,0.002718251,0.028806513,0.0032789493,0.00047336618,0.013574339],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.88949776,0.07635768,0.011617688,0.0043799165,0.012959257,0.005187751],"domain_scores_gemma":[0.64901626,0.14276329,0.017596686,0.02254498,0.14658733,0.021491397],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.1588623,0.003569695,0.0023232168,0.009543849,0.0037538656,0.014839093,0.009139579,0.012366888,0.027289638],"category_scores_gemma":[0.34816402,0.0017583768,0.0028891263,0.009850275,0.004279911,0.024977144,0.0073898826,0.014232866,0.011073659],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004539481,0.0020184217,0.021884719,0.0069761844,0.00018474757,0.0008910078,0.016123138,0.008974948,0.0026113393,0.06354151,0.402488,0.473852],"study_design_scores_gemma":[0.0010138045,0.0010556129,0.037777264,0.03060543,0.0003961054,0.0010419176,0.14523797,0.028743856,0.0034851213,0.17865917,0.5708384,0.0011453833],"about_ca_topic_score_codex":0.021742562,"about_ca_topic_score_gemma":0.024530428,"teacher_disagreement_score":0.1588623,"about_ca_system_score_codex":0.0148342615,"about_ca_system_score_gemma":0.04954261,"threshold_uncertainty_score":0.8401542},"labels":[],"label_agreement":null},{"id":"W7097637636","doi":"","title":"I Trends in Real Output in the Construction Sector........................................ 14 A. Total Construction Sector","year":2001,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Corporation; Quality (philosophy); Construction industry; Production (economics)","score_opus":0.09357655780201345,"score_gpt":0.3448093035353774,"score_spread":0.25123274573336396,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097637636","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8620264,0.0023731089,0.0008057124,0.0031915512,0.000116830066,0.000023232362,0.10732496,0.00024713308,0.023891104],"genre_scores_gemma":[0.9508428,0.0018782846,0.00059658755,0.00012166566,0.00009909637,0.000025014493,0.031447344,0.000043266944,0.014945921],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99959284,0.00005407703,0.000050228842,0.00009299562,0.00011955961,0.000090345806],"domain_scores_gemma":[0.99697495,0.00076011993,0.0008287702,0.00008708715,0.001091817,0.0002572383],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033579755,0.00013502702,0.00014936522,0.0019481834,0.00017645113,0.0014359396,0.00028520016,0.00048742924,0.014913949],"category_scores_gemma":[0.0030848696,0.00015628531,0.0003147997,0.006000048,0.00028030528,0.0011917952,0.00035763334,0.00052300864,0.0038053219],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047720407,0.00009033457,0.9082534,0.00042018475,0.00010271893,0.00011601302,0.00090009347,0.0045411494,0.0012566,0.0072873062,0.041881163,0.034673885],"study_design_scores_gemma":[0.000007211452,0.000068673275,0.98329145,0.00005330285,0.0000130223625,0.000108684,0.0008310097,0.0022548751,0.0004391434,0.0003923825,0.012526129,0.00001414875],"about_ca_topic_score_codex":0.044850305,"about_ca_topic_score_gemma":0.043322586,"teacher_disagreement_score":0.044850305,"about_ca_system_score_codex":0.0011741711,"about_ca_system_score_gemma":0.00074015424,"threshold_uncertainty_score":0.08917844},"labels":[],"label_agreement":null},{"id":"W7097996285","doi":"","title":"Winnipeg Police Service Headquarters Construction Project Audit","year":2014,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Service (business); Audit; Work (physics); Financial Audit; Government (linguistics)","score_opus":0.07121912426319853,"score_gpt":0.35442942087888396,"score_spread":0.2832102966156854,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097996285","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.64822865,0.0011725237,0.007491956,0.011264207,0.0012408838,0.008157831,0.026583618,0.00072748517,0.29513276],"genre_scores_gemma":[0.6884729,0.0010259154,0.017709678,0.00088343886,0.000064537526,0.0011084452,0.006919714,0.00027287938,0.2835425],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99637586,0.00051023945,0.0001644382,0.00031681306,0.0019088514,0.0007238422],"domain_scores_gemma":[0.9898086,0.00057038874,0.0004795335,0.0005059009,0.0075053307,0.0011301979],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026226742,0.00036542676,0.00028033232,0.0023061014,0.0033017225,0.0026017185,0.00092569535,0.0004588053,0.016659407],"category_scores_gemma":[0.011426486,0.0006640469,0.00018165159,0.0021750769,0.00042252179,0.00045882326,0.0015002514,0.0007177277,0.0018605253],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001715863,0.00028928087,0.1922207,0.00088486896,0.00013635462,0.0021163383,0.0048039756,0.008208099,0.009829765,0.014426627,0.40940776,0.35596034],"study_design_scores_gemma":[0.000092338676,0.00020936198,0.35005805,0.00028165494,0.000058186197,0.0002395099,0.005302474,0.0035267863,0.004215274,0.0006595357,0.635294,0.000062881656],"about_ca_topic_score_codex":0.81076026,"about_ca_topic_score_gemma":0.94203967,"teacher_disagreement_score":0.18923974,"about_ca_system_score_codex":0.016843801,"about_ca_system_score_gemma":0.072102346,"threshold_uncertainty_score":0.3807084},"labels":[],"label_agreement":null},{"id":"W7099076886","doi":"","title":"Communications Lab, University of Toronto Experiment 4: Pulse Code Modulation","year":2016,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pulse-code modulation; Code (set theory); Modulation (music); Quantization (signal processing); Pulse-position modulation; Pulse-amplitude modulation; Sampling (signal processing)","score_opus":0.1192477118197809,"score_gpt":0.3657365692958516,"score_spread":0.2464888574760707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7099076886","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83081436,0.0003095971,0.015862137,0.0040614214,0.0011001815,0.0025840078,0.011321476,0.0014247783,0.132522],"genre_scores_gemma":[0.8041222,0.00034626326,0.015298636,0.0017804542,0.0002117525,0.0020761,0.004897375,0.00033185177,0.17093526],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99895006,0.00015876755,0.000038156064,0.00018426424,0.000505473,0.00016330792],"domain_scores_gemma":[0.9949763,0.0016228782,0.00022161116,0.0009872854,0.0012994874,0.0008925652],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013280528,0.0004562613,0.0006126439,0.00026976885,0.0019866866,0.0010155733,0.0009131674,0.00128041,0.045191918],"category_scores_gemma":[0.004942296,0.00040616904,0.00024074408,0.00041782728,0.0010224549,0.0006216384,0.00061965117,0.0015945513,0.00480047],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.06856687,0.017671112,0.058444723,0.0014984978,0.00034472172,0.0021192357,0.006286662,0.010283015,0.32946748,0.024730526,0.30133578,0.17925127],"study_design_scores_gemma":[0.013088246,0.059418105,0.32543543,0.00031292517,0.00072243286,0.0015595236,0.0050429446,0.023235569,0.1960898,0.017752225,0.3566757,0.0006671536],"about_ca_topic_score_codex":0.09582177,"about_ca_topic_score_gemma":0.14317894,"teacher_disagreement_score":0.09582177,"about_ca_system_score_codex":0.002177708,"about_ca_system_score_gemma":0.004627607,"threshold_uncertainty_score":0.19052804},"labels":[],"label_agreement":null},{"id":"W7099758932","doi":"","title":"and Risk Management","year":2016,"lang":"en","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Documentation; Vendor; Identification (biology); Integrated project delivery; Service delivery framework; Risk management; Project risk management; Project management; Project management triangle; Action research","score_opus":0.05533593820304237,"score_gpt":0.33997882522170675,"score_spread":0.28464288701866436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7099758932","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028786153,0.024111174,0.2691839,0.062411595,0.002805855,0.0010178883,0.0007662533,0.0008709732,0.6100462],"genre_scores_gemma":[0.6908936,0.017853115,0.0984281,0.011987526,0.0030784737,0.00087577367,0.0007372827,0.00024580085,0.17590038],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99100363,0.002882725,0.0006618687,0.00115514,0.003691933,0.000604712],"domain_scores_gemma":[0.9851178,0.0050188056,0.0025091718,0.0020972884,0.004398332,0.0008586512],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.010302416,0.001096426,0.00074146595,0.0029483235,0.0026615215,0.009802849,0.0020250548,0.0027957708,0.025662249],"category_scores_gemma":[0.024834229,0.00037844176,0.0010255,0.0015963939,0.0030859637,0.0050223414,0.0042419136,0.0029515617,0.004991677],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008723953,0.000229431,0.013332456,0.00062295486,0.00024786525,0.0005484717,0.003385654,0.005131498,0.0009775109,0.599024,0.046036642,0.33037624],"study_design_scores_gemma":[0.000045549743,0.0002707458,0.008620842,0.0011623506,0.00013739768,0.0017882929,0.0041204155,0.008406641,0.0013166714,0.55241394,0.42157006,0.000147111],"about_ca_topic_score_codex":0.0022116315,"about_ca_topic_score_gemma":0.001884138,"teacher_disagreement_score":0.97433776,"about_ca_system_score_codex":0.0028214576,"about_ca_system_score_gemma":0.004580132,"threshold_uncertainty_score":0.08584875},"labels":[],"label_agreement":null},{"id":"W7104452684","doi":"10.71781/24394","title":"L'impact de la gestion des ressources humaines sur le succès des projets","year":2000,"lang":"","type":"dissertation","venue":"Papyrus : Institutional Repository (Université de Montréal)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Independent state; Lien","score_opus":0.02195918712087942,"score_gpt":0.2487829564872004,"score_spread":0.22682376936632098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7104452684","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69801366,0.003874275,0.101586215,0.0072866282,0.0002605858,0.00052173453,0.00085213326,0.0005173158,0.18708745],"genre_scores_gemma":[0.9661234,0.0017317309,0.01814313,0.00025753753,0.00006130905,0.0002273563,0.00017681804,0.00009067755,0.013187946],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9907126,0.004957187,0.00038103428,0.00084848446,0.0024388845,0.0006618353],"domain_scores_gemma":[0.916639,0.06083712,0.007372477,0.0044110524,0.0075768568,0.003163547],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010209855,0.0007171545,0.000570316,0.001864721,0.0013553766,0.005267637,0.0013418742,0.0014067487,0.015432919],"category_scores_gemma":[0.03825569,0.00040308174,0.0008895845,0.0014535756,0.0027164838,0.0038451073,0.0036326405,0.0016537855,0.0018236344],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006517234,0.00095469266,0.2183032,0.0043260125,0.00064716866,0.001282542,0.05611375,0.0259913,0.013580823,0.17303872,0.005955698,0.4991544],"study_design_scores_gemma":[0.00012139635,0.003767698,0.6240291,0.0030232905,0.00059971574,0.0011164561,0.07709813,0.018114306,0.014407577,0.12311858,0.13422765,0.00037605024],"about_ca_topic_score_codex":0.0054703797,"about_ca_topic_score_gemma":0.007653889,"teacher_disagreement_score":0.015432919,"about_ca_system_score_codex":0.002486655,"about_ca_system_score_gemma":0.0032779411,"threshold_uncertainty_score":0.05399555},"labels":[],"label_agreement":null},{"id":"W7104536005","doi":"10.1115/1.4070141","title":"Application of a Fuzzy Decision Support System for Project Risk Management in Rail Transportation Infrastructure","year":2025,"lang":"en","type":"article","venue":"ASME Open Journal of Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Scope (computer science); Fuzzy logic; Risk management; Decision support system; Schedule; Adaptability; Risk assessment; Cost contingency; Fuzzy rule; Contingency plan","score_opus":0.020367374037644933,"score_gpt":0.3385779581561329,"score_spread":0.31821058411848796,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7104536005","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16473642,0.00013040823,0.8265382,0.00047921872,0.000087042106,0.00041529463,0.00038299293,0.0024093967,0.004821053],"genre_scores_gemma":[0.74779713,0.00006971936,0.25065652,0.000080308884,0.000020321306,0.00018303501,0.00016241231,0.0000300194,0.0010005805],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99891126,0.00038739928,0.00011797941,0.000191678,0.00032576246,0.000065854576],"domain_scores_gemma":[0.99594706,0.002523218,0.00024893627,0.00022642507,0.00089630944,0.00015809234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029410045,0.0006045532,0.0005483083,0.0014224972,0.00064743654,0.0017494438,0.00096185185,0.00084102474,0.0036597871],"category_scores_gemma":[0.007928432,0.00025751637,0.00065490627,0.000606597,0.00033855892,0.0009771084,0.0009554214,0.0006179255,0.00041360856],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010631471,0.00055106374,0.008892056,0.00028405772,0.0001541228,0.00053588965,0.00078688905,0.6359689,0.012279245,0.011446133,0.0028608963,0.32517755],"study_design_scores_gemma":[0.00003749432,0.0001069698,0.0005363047,0.00002563593,0.000024607629,0.000035101268,0.00005974595,0.9932342,0.002260338,0.0026034163,0.0010572391,0.000018837765],"about_ca_topic_score_codex":0.007651911,"about_ca_topic_score_gemma":0.005253922,"teacher_disagreement_score":0.007651911,"about_ca_system_score_codex":0.0013572016,"about_ca_system_score_gemma":0.0013370565,"threshold_uncertainty_score":0.015553653},"labels":[],"label_agreement":null},{"id":"W7105801262","doi":"10.1007/978-3-031-97697-1_11","title":"Assessing the Impact of Innovation in Construction: A Literature Review","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Status quo; Construction industry; Industry 4.0","score_opus":0.038410868976702296,"score_gpt":0.35738491114392645,"score_spread":0.31897404216722414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7105801262","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022685234,0.9957066,0.00016112832,0.0005890705,0.00007891709,0.000012019329,0.000069092224,0.0000023096286,0.001112417],"genre_scores_gemma":[0.016059807,0.98302054,0.0003761785,0.0002582763,0.00009492696,0.0000130243125,0.00008106303,0.0000027826793,0.0000933141],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9956072,0.0012467474,0.0008702529,0.00047788132,0.001632487,0.00016549902],"domain_scores_gemma":[0.9206727,0.06991973,0.004250642,0.00039499946,0.004325769,0.00043620603],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008018109,0.0007487465,0.0015966957,0.013601719,0.0004982036,0.0040648333,0.0011710102,0.0017963978,0.0030045186],"category_scores_gemma":[0.02760173,0.00064980786,0.0014697039,0.022095047,0.0014244425,0.004805484,0.0013514766,0.001094509,0.0003707904],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015875499,0.00018999976,0.014622364,0.14171316,0.0011844211,0.0003699287,0.00075771793,0.0015830718,0.0004300248,0.006258147,0.007748084,0.8249843],"study_design_scores_gemma":[0.0000638009,0.0005921208,0.12206482,0.52175385,0.008928483,0.00222832,0.009073343,0.0018198504,0.0016753955,0.013011032,0.31857777,0.00021130161],"about_ca_topic_score_codex":0.008506632,"about_ca_topic_score_gemma":0.023154575,"teacher_disagreement_score":0.013601719,"about_ca_system_score_codex":0.003155284,"about_ca_system_score_gemma":0.010035988,"threshold_uncertainty_score":0.042404294},"labels":[],"label_agreement":null},{"id":"W7112534420","doi":"","title":"Estimating","year":2022,"lang":"en","type":"article","venue":"Research Explorer (The University of Manchester)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Civil servants; Norwegian; Corporate governance; Field (mathematics); Public management; Public sector","score_opus":0.313627673307233,"score_gpt":0.4033762225080068,"score_spread":0.0897485492007738,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7112534420","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008486397,0.0020434612,0.050282516,0.006441842,0.0025942863,0.0007676639,0.013467905,0.0023476363,0.9135683],"genre_scores_gemma":[0.1297371,0.004513501,0.049016535,0.0030885949,0.0008661468,0.001086591,0.027330147,0.001549641,0.7828117],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99575657,0.0008297586,0.00024612556,0.0009742452,0.0017622788,0.00043102686],"domain_scores_gemma":[0.9949956,0.0009770537,0.00033148963,0.00096703175,0.002433567,0.00029517675],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0032254953,0.0009986593,0.00062398036,0.0027072357,0.0014994422,0.0063498546,0.0017519239,0.0018252835,0.29436788],"category_scores_gemma":[0.016863955,0.00040067642,0.00093293365,0.0037312948,0.0007562206,0.0051984596,0.002798278,0.001618928,0.17577933],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000176039,0.000110753135,0.0076579037,0.00052160496,0.00005928454,0.00018424026,0.00096399663,0.002063573,0.00087930606,0.11461487,0.3649355,0.50783294],"study_design_scores_gemma":[0.000016211847,0.000044608973,0.0038453636,0.00028239592,0.00002392282,0.00019294699,0.00093987247,0.0015077449,0.0007160685,0.021665877,0.9707381,0.000026789043],"about_ca_topic_score_codex":0.00831828,"about_ca_topic_score_gemma":0.0073966216,"teacher_disagreement_score":0.7056321,"about_ca_system_score_codex":0.0022323583,"about_ca_system_score_gemma":0.002998819,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W7114766204","doi":"10.5267/j.jpm.2025.12.001","title":"Delay causes of the site-clearance process for public infrastructure projects in Vietnam: Differences across roles and project sizes","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Viet Nam National University Ho Chi Minh City; Ho Chi Minh City University of Technology and Education","keywords":"Staffing; Project management; Stakeholder; Process (computing); Scale (ratio); Public infrastructure; Prioritization; Project stakeholder; Variance (accounting); Integrated project delivery","score_opus":0.06699597420507739,"score_gpt":0.3846937658486076,"score_spread":0.3176977916435302,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7114766204","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99764866,0.000046809346,0.00048497092,0.00012923194,0.000003637894,0.000023487573,0.000032067048,0.000004025403,0.0016270307],"genre_scores_gemma":[0.99942255,0.00003586136,0.00018377334,0.000010786784,9.146085e-7,0.000012627347,0.000018700686,0.0000027323351,0.0003121508],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99606663,0.0016070516,0.00027440523,0.00040669533,0.00094479416,0.0007004374],"domain_scores_gemma":[0.9829911,0.00757378,0.005301802,0.00048487933,0.0023183203,0.0013301737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040793624,0.00019128734,0.00016070082,0.0005652838,0.0013972883,0.0015623829,0.0005076634,0.00025935427,0.0022378997],"category_scores_gemma":[0.015038024,0.00029086936,0.00016004387,0.00081499544,0.001269486,0.00143378,0.0015972963,0.0005289438,0.00012280719],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019330833,0.00017108866,0.80691195,0.00030526228,0.000035504876,0.0012697743,0.13830532,0.0016325105,0.00221978,0.0028811747,0.00090777193,0.045166653],"study_design_scores_gemma":[0.0000067948413,0.0002580431,0.7888717,0.00012174883,0.000015479942,0.00027858463,0.19985479,0.0016253124,0.00071392447,0.0007232768,0.0074988627,0.000031413696],"about_ca_topic_score_codex":0.033911165,"about_ca_topic_score_gemma":0.05279816,"teacher_disagreement_score":0.033911165,"about_ca_system_score_codex":0.0043520224,"about_ca_system_score_gemma":0.0053403853,"threshold_uncertainty_score":0.067427576},"labels":[],"label_agreement":null},{"id":"W7114785957","doi":"10.5267/j.jpm.2025.9.010","title":"A systematic review of managing sustainable construction projects: Insights from education, innovation, and governance","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Prince Sattam bin Abdulaziz University","keywords":"Corporate governance; Sustainability; Sustainable development; Scopus; Construction management; Experiential learning","score_opus":0.021372079527547785,"score_gpt":0.33485526840694807,"score_spread":0.3134831888794003,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7114785957","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0037696632,0.9904094,0.0012820814,0.0013997072,0.0002576797,0.0009341419,0.00062852824,0.000014104698,0.0013047338],"genre_scores_gemma":[0.03211121,0.96029794,0.0044947383,0.00075488834,0.00010151233,0.0014832248,0.00045391393,0.00000947948,0.00029299734],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9731364,0.012239859,0.00823747,0.001012332,0.0048250384,0.0005489305],"domain_scores_gemma":[0.91933054,0.05523173,0.010313436,0.0019784467,0.012161031,0.0009848026],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02376417,0.0014165532,0.0045385784,0.030380534,0.0012597356,0.003899291,0.0015710449,0.0020240904,0.0020753024],"category_scores_gemma":[0.092994094,0.00085770944,0.0044063274,0.026806066,0.0013035366,0.003993084,0.0024637594,0.0012599779,0.0002611948],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011061217,0.00004033918,0.0016463321,0.8499587,0.003373153,0.00036705745,0.0017932645,0.00031684287,0.00041925473,0.0018792463,0.004035145,0.13606004],"study_design_scores_gemma":[0.00005631794,0.00015289005,0.0042798044,0.9285473,0.010763881,0.00044959132,0.0019461771,0.00014249506,0.0002793536,0.0012093284,0.052127864,0.000045102974],"about_ca_topic_score_codex":0.008244854,"about_ca_topic_score_gemma":0.036526717,"teacher_disagreement_score":0.030380534,"about_ca_system_score_codex":0.0049540936,"about_ca_system_score_gemma":0.039076254,"threshold_uncertainty_score":0.12567848},"labels":[],"label_agreement":null},{"id":"W7115320623","doi":"","title":"Artificial Intelligence (AI) Based Project Management: A Review of Construction Industry","year":2025,"lang":"en","type":"article","venue":"Research Explorer (The University of Manchester)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Thompson Rivers University","funders":"","keywords":"Construction industry; Industry 4.0; Applications of artificial intelligence; Key (lock)","score_opus":0.2710032868792678,"score_gpt":0.4435391089088211,"score_spread":0.1725358220295533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7115320623","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0004128675,0.9959858,0.0006756403,0.0012017707,0.000119128636,0.0000055761693,0.000008729258,0.000004140614,0.0015862285],"genre_scores_gemma":[0.0039955513,0.99380165,0.0011711658,0.00043336692,0.00030593498,0.000008411282,0.000015210905,0.0000022014283,0.000266521],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99864215,0.00043645123,0.0001928799,0.00012993779,0.0005502057,0.00004836906],"domain_scores_gemma":[0.9916687,0.0063257706,0.0006836994,0.000088665176,0.0010551399,0.00017797799],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031163383,0.0005438518,0.00075374346,0.004416015,0.00035243103,0.0023910212,0.0010651138,0.0015879242,0.0013596644],"category_scores_gemma":[0.0049325735,0.00027458527,0.0003864762,0.00897423,0.0012712175,0.0025284847,0.0007336379,0.0012750293,0.00036004029],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052483276,0.00014087014,0.0010313742,0.026090087,0.00007637691,0.00011710709,0.00027342004,0.002028853,0.0006666967,0.018837621,0.014872007,0.935813],"study_design_scores_gemma":[0.000020530557,0.00022731465,0.006075765,0.021765014,0.00017190435,0.0006985813,0.0007773627,0.0021252765,0.0006905578,0.018364647,0.9490257,0.00005736386],"about_ca_topic_score_codex":0.0025047662,"about_ca_topic_score_gemma":0.004734751,"teacher_disagreement_score":0.004416015,"about_ca_system_score_codex":0.0014320265,"about_ca_system_score_gemma":0.0026973663,"threshold_uncertainty_score":0.016480982},"labels":[],"label_agreement":null},{"id":"W7117310311","doi":"10.1061/jladah.ladr-1420","title":"Exploring Teaching Methods for Construction Contract Law Using Analytic Hierarchy Process","year":2025,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WSP (Canada)","funders":"","keywords":"Construction contract; Process (computing); Subject (documents); Hierarchy; Analytic hierarchy process; Rank (graph theory); Construction management; Construction industry","score_opus":0.07719071824035535,"score_gpt":0.3895350119398864,"score_spread":0.31234429369953104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7117310311","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23410441,0.0008395921,0.7036232,0.002794925,0.00011601823,0.0033259916,0.00019754325,0.0003861941,0.054612227],"genre_scores_gemma":[0.40213904,0.00097576925,0.59153473,0.00024761257,0.000027668118,0.0015908554,0.000105715655,0.000050470182,0.0033280854],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9912976,0.0056745987,0.00030899042,0.00043908507,0.0019700706,0.0003097224],"domain_scores_gemma":[0.9825456,0.014136792,0.00091131567,0.0006792818,0.0013393102,0.00038763008],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009471297,0.0005699745,0.00034326696,0.0025226045,0.0015058712,0.0038135068,0.0015532108,0.000639918,0.004263023],"category_scores_gemma":[0.015953805,0.00028666572,0.0005685976,0.0025866,0.0016746712,0.0023711855,0.0019690166,0.001976469,0.00068879017],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015051843,0.002326247,0.014121153,0.0020635896,0.00005887976,0.0005557778,0.102167144,0.007697626,0.008824543,0.100844435,0.0050147576,0.75617546],"study_design_scores_gemma":[0.000587794,0.0034904096,0.030415384,0.004680972,0.0002065425,0.0024323533,0.25768995,0.16593762,0.03405007,0.23277852,0.26739836,0.00033211327],"about_ca_topic_score_codex":0.0021133842,"about_ca_topic_score_gemma":0.0040152576,"teacher_disagreement_score":0.009471297,"about_ca_system_score_codex":0.0029348459,"about_ca_system_score_gemma":0.005401789,"threshold_uncertainty_score":0.050089598},"labels":[],"label_agreement":null},{"id":"W7117316631","doi":"10.1061/jladah.ladr-1320","title":"Governance Strategies for Execution of Public Building Projects","year":2025,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Project governance; Corporate governance; Integrated project delivery; Transaction cost; Database transaction; Project management; Good governance; Building information modeling","score_opus":0.025470376966296848,"score_gpt":0.2941280663628407,"score_spread":0.2686576893965439,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7117316631","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73960257,0.0010179834,0.097151674,0.0059930314,0.00006223232,0.001639633,0.00010139272,0.00014627616,0.15428513],"genre_scores_gemma":[0.9843634,0.00028364765,0.010690823,0.00005857906,0.000008565531,0.00014450241,0.000028706,0.000009677568,0.0044121384],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99316883,0.0036831098,0.00050430454,0.0003897657,0.0012106542,0.0010432595],"domain_scores_gemma":[0.9936737,0.0013554888,0.0022303297,0.00050536584,0.0011410055,0.001094244],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0064301128,0.00022533642,0.00013231498,0.001543548,0.0021336328,0.004416432,0.0005301751,0.0006579508,0.0026590985],"category_scores_gemma":[0.009088631,0.00020503701,0.0001703038,0.0016009825,0.0016829025,0.0018351994,0.0025658633,0.0006301392,0.00030713223],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000099212026,0.000550719,0.16475989,0.0005551214,0.00009782882,0.0025832525,0.026591724,0.029919751,0.0063608736,0.3995503,0.008427764,0.3605036],"study_design_scores_gemma":[0.00012950359,0.0012228492,0.25813678,0.0019602051,0.00013001684,0.0023467857,0.139989,0.05271764,0.008426277,0.21868981,0.3160338,0.00021727571],"about_ca_topic_score_codex":0.0029820278,"about_ca_topic_score_gemma":0.0071322797,"teacher_disagreement_score":0.0064301128,"about_ca_system_score_codex":0.0028979105,"about_ca_system_score_gemma":0.007329506,"threshold_uncertainty_score":0.03400612},"labels":[],"label_agreement":null},{"id":"W7117316833","doi":"10.1016/j.procs.2025.12.017","title":"Identification and Comparative Analysis of Legal and Contractual Provisions among Different Contract Types in Off-site Construction Projects","year":2025,"lang":"en","type":"article","venue":"Procedia Computer Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"University of Alberta","keywords":"Terminology; CLARITY; Construction contract; Pace; Consistency (knowledge bases); Identification (biology); Constructive; Contract management; Quickening","score_opus":0.03691916975233875,"score_gpt":0.3375415751914141,"score_spread":0.30062240543907537,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7117316833","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9837773,0.00025340472,0.005298872,0.00014052044,0.0000072801313,0.00012676672,0.00019946115,0.000009529744,0.010186882],"genre_scores_gemma":[0.99456525,0.00015171092,0.004049089,0.000015771084,0.0000022949669,0.000073627416,0.00029425332,0.0000123462905,0.0008356592],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98533857,0.0066697467,0.0014030972,0.0009108811,0.004906385,0.00077132747],"domain_scores_gemma":[0.93629366,0.038140655,0.012257757,0.0027940236,0.009581425,0.0009324499],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012654167,0.00014738481,0.0002186311,0.0068422193,0.0018366387,0.0025602411,0.00078260794,0.00052080536,0.0022501668],"category_scores_gemma":[0.054805633,0.00024849933,0.00028528963,0.007703374,0.0029776052,0.003195109,0.0028868963,0.0007873294,0.00020730434],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005081189,0.00022873854,0.5745518,0.00071355613,0.00009279442,0.0010196699,0.14805797,0.0029056976,0.0060210354,0.06676701,0.0014938475,0.19763978],"study_design_scores_gemma":[0.000018304634,0.0002655938,0.7736806,0.00061447424,0.000082847444,0.00061475293,0.17899506,0.0084374305,0.0026872042,0.009875971,0.024651555,0.00007616341],"about_ca_topic_score_codex":0.011167257,"about_ca_topic_score_gemma":0.024113877,"teacher_disagreement_score":0.012654167,"about_ca_system_score_codex":0.0038070646,"about_ca_system_score_gemma":0.0039885864,"threshold_uncertainty_score":0.066922426},"labels":[],"label_agreement":null},{"id":"W7117482801","doi":"10.5281/zenodo.18078076","title":"Obligation Closure Constraint (OCC): The First Principle","year":2025,"lang":"en","type":"preprint","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Stock (firearms); Constraint (computer-aided design); Robustness (evolution); Empirical research; Identifier; Empirical evidence; Software; Equity (law)","score_opus":0.10694933410570862,"score_gpt":0.3438575103707111,"score_spread":0.2369081762650025,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7117482801","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010264444,0.0012305332,0.65439236,0.02013105,0.0011133031,0.0012741133,0.0027399948,0.001901451,0.3069527],"genre_scores_gemma":[0.51654243,0.0012461463,0.42466995,0.010995548,0.0017945636,0.0025762285,0.0021774296,0.0011513219,0.038846403],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9777452,0.006517918,0.0019999777,0.0050445036,0.006979896,0.0017124752],"domain_scores_gemma":[0.96568274,0.019753495,0.0016465264,0.005627628,0.00632226,0.0009672656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019527668,0.0013118746,0.0013573226,0.0017382975,0.004125641,0.0076869815,0.004472132,0.005162076,0.019870032],"category_scores_gemma":[0.05240022,0.0013882946,0.0025830457,0.001277778,0.01164556,0.015830882,0.0062845456,0.0098028155,0.0050925943],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052971238,0.000047912108,0.00061959634,0.00026056304,0.000026793672,0.00020454734,0.00086966116,0.0018786447,0.00057736866,0.9530361,0.016592575,0.02583328],"study_design_scores_gemma":[0.00009037623,0.00007488537,0.00068298157,0.00041377562,0.00006516008,0.00070178736,0.0005683407,0.01318412,0.002025666,0.8370561,0.1450254,0.000111429676],"about_ca_topic_score_codex":0.010145504,"about_ca_topic_score_gemma":0.00512906,"teacher_disagreement_score":0.019870032,"about_ca_system_score_codex":0.0034993608,"about_ca_system_score_gemma":0.009926197,"threshold_uncertainty_score":0.10327345},"labels":[],"label_agreement":null},{"id":"W7118309180","doi":"10.18280/ijsse.151005","title":"Risk Management and Mitigation Strategies for Project Delays in EPCC Contracts","year":2025,"lang":"","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Risk management; Risk assessment; IT risk management; Risk management information systems; Poison control; Project risk management","score_opus":0.012933384991825041,"score_gpt":0.3073017193115929,"score_spread":0.29436833431976783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7118309180","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7467444,0.0008748674,0.2129809,0.0021788669,0.00009230493,0.0005945768,0.0002656647,0.0001507244,0.036117643],"genre_scores_gemma":[0.9880108,0.00012239038,0.008991317,0.000028119655,0.000014732402,0.00008021454,0.000035513065,0.00000848069,0.002708478],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99653035,0.0013545011,0.0001869052,0.00027886184,0.00084195135,0.0008075063],"domain_scores_gemma":[0.9843156,0.0095224455,0.0024694963,0.0005583021,0.0024218499,0.0007122915],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006997524,0.00065896555,0.00051127665,0.0017722566,0.0011047291,0.0030348673,0.0015162872,0.0015607241,0.0042624],"category_scores_gemma":[0.030196045,0.0003763079,0.0005672757,0.001094508,0.0005679649,0.0024314658,0.0018694041,0.0016856855,0.00020148291],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008230884,0.0005298838,0.026990646,0.00023440653,0.000111855814,0.0005889653,0.0015917859,0.68116933,0.0039089555,0.15587507,0.00294794,0.12522802],"study_design_scores_gemma":[0.00010744085,0.0010896273,0.019383524,0.00022013352,0.00017352375,0.00031294234,0.004294578,0.84848493,0.0031047103,0.1162751,0.006450375,0.00010314499],"about_ca_topic_score_codex":0.006879577,"about_ca_topic_score_gemma":0.006670726,"teacher_disagreement_score":0.006997524,"about_ca_system_score_codex":0.003066112,"about_ca_system_score_gemma":0.0048543457,"threshold_uncertainty_score":0.037006915},"labels":[],"label_agreement":null},{"id":"W7118382507","doi":"10.61503/cissmp.v4i2.309","title":"The Influence of Risk Mitigation, Continuous Process Improvement, and Digital Transformation on Organizational Performance: Evidence from Saudi Arabia","year":2025,"lang":"","type":"article","venue":"Contemporary Issues in Social Sciences and Management Practices","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Royal Canadian Navy","funders":"","keywords":"Process (computing); Automation; Variance (accounting); SAFER; Sample (material); Digital transformation; Structural equation modeling; Organizational structure","score_opus":0.043371894683787604,"score_gpt":0.3750391076442721,"score_spread":0.3316672129604845,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7118382507","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9969126,0.0015148652,0.00010257973,0.00031692113,0.0000055936307,0.0000072521557,0.000018011022,0.0000011990429,0.0011209502],"genre_scores_gemma":[0.99843687,0.0012921247,0.00011576722,0.000060485232,0.000006008259,0.0000032972662,0.000020029345,7.45727e-7,0.00006472696],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9952767,0.002325994,0.00040299897,0.00030440767,0.0013206212,0.0003692639],"domain_scores_gemma":[0.9488504,0.026994595,0.01406392,0.0014608083,0.0068336274,0.0017967324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0065765586,0.00038772202,0.0002908078,0.0014962273,0.00077385415,0.0018171006,0.00057479466,0.00048835354,0.000983521],"category_scores_gemma":[0.022611193,0.00020011704,0.00038677143,0.0015522519,0.0014913745,0.0010888241,0.0013757049,0.00061608606,0.00018000294],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051352516,0.0007502701,0.877345,0.000624014,0.0004079785,0.00022155914,0.012776413,0.00066101004,0.00045473012,0.0011436117,0.00032324583,0.10477851],"study_design_scores_gemma":[0.000039738086,0.00058791065,0.9769582,0.00055063615,0.00019873402,0.00012721826,0.01710637,0.0009040647,0.0007501356,0.00030986403,0.0024344153,0.000032612585],"about_ca_topic_score_codex":0.025978288,"about_ca_topic_score_gemma":0.026376309,"teacher_disagreement_score":0.025978288,"about_ca_system_score_codex":0.001963848,"about_ca_system_score_gemma":0.003278701,"threshold_uncertainty_score":0.05165416},"labels":[],"label_agreement":null},{"id":"W7126931370","doi":"","title":"Le management de projets et ses évolutions en Amérique du nord","year":2000,"lang":"fr","type":"article","venue":"Persée (Ministère de lEnseignement supérieur et de la Recherche)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Project management; Control (management); Management control system; Field (mathematics); Focus (optics); Management development","score_opus":0.08411880257081182,"score_gpt":0.3813488890117489,"score_spread":0.29723008644093707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7126931370","genre_codex":"empirical","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9582274,0.0075401687,0.0014910353,0.003517788,0.000066237495,0.000022664866,0.000050783725,0.000018396591,0.02906549],"genre_scores_gemma":[0.9716566,0.006087863,0.0026166711,0.00044697177,0.000025916755,0.000047993537,0.000070036054,0.00001711866,0.019030869],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99769336,0.0008517327,0.00011359273,0.00021653714,0.0007649444,0.00035981595],"domain_scores_gemma":[0.9922007,0.003166872,0.0013630993,0.00019883762,0.0019153173,0.0011553039],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045813187,0.00023977578,0.00018670224,0.0023753876,0.0030843914,0.004386129,0.00052645174,0.0007308794,0.0015952429],"category_scores_gemma":[0.006908273,0.0002850955,0.00019119999,0.0033463768,0.002427025,0.0019149684,0.0014110658,0.0012361153,0.00017351734],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00058503286,0.00079113955,0.25865003,0.00040737464,0.00007429883,0.0033073653,0.16919132,0.005067829,0.004460475,0.08290034,0.008878449,0.46568644],"study_design_scores_gemma":[0.000058072463,0.0002945464,0.65736866,0.00079070905,0.000029567256,0.0013940062,0.10516187,0.002712292,0.0013192347,0.006902247,0.22387116,0.00009758893],"about_ca_topic_score_codex":0.5174759,"about_ca_topic_score_gemma":0.52837694,"teacher_disagreement_score":0.5174759,"about_ca_system_score_codex":0.019260587,"about_ca_system_score_gemma":0.019711806,"threshold_uncertainty_score":0.97073156},"labels":[],"label_agreement":null},{"id":"W7127902619","doi":"10.22260/crc-csce-2025/0018","title":"Risk-Based Comparison of Collaborative Delivery Methods in Canadian Construction: Progressive Design Build, Integrated Project Delivery and Project Alliancing","year":2025,"lang":"","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Integrated project delivery; Component (thermodynamics); Work (physics); Process (computing)","score_opus":0.07537738885509968,"score_gpt":0.43634863300823895,"score_spread":0.3609712441531393,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127902619","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96545583,0.002928567,0.004957796,0.0007659962,0.000032216325,0.00087845774,0.0010293431,0.000039782837,0.023911979],"genre_scores_gemma":[0.990905,0.0014616969,0.0051106787,0.00007606027,0.0000070448405,0.0003389869,0.00059754273,0.000023603869,0.0014793199],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9733604,0.0060536475,0.0020288418,0.0013529971,0.014944563,0.0022594985],"domain_scores_gemma":[0.926482,0.025071159,0.011641806,0.0023380537,0.030653944,0.0038129934],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020413011,0.00076528604,0.0008358553,0.008617638,0.00569312,0.0057704113,0.0028006912,0.0006865881,0.002471458],"category_scores_gemma":[0.076701365,0.00045641555,0.0010916522,0.016438128,0.0033423828,0.0021470524,0.0054957266,0.0013549364,0.00019281398],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014411062,0.0007426914,0.60510933,0.0024332807,0.0007517886,0.00040173187,0.079215735,0.009961472,0.0011984288,0.021412635,0.0039087776,0.27342302],"study_design_scores_gemma":[0.00015919107,0.0007664014,0.843141,0.0012340996,0.00045693095,0.00016255236,0.1123772,0.012863858,0.0014389515,0.0036558048,0.023479016,0.00026503054],"about_ca_topic_score_codex":0.945133,"about_ca_topic_score_gemma":0.9716635,"teacher_disagreement_score":0.10672757,"about_ca_system_score_codex":0.10672757,"about_ca_system_score_gemma":0.14252013,"threshold_uncertainty_score":0.7743664},"labels":[],"label_agreement":null},{"id":"W7127908654","doi":"10.22260/crc-csce-2025/0121","title":"Automated Extraction and Analysis of Greenhouse Gas Emissions in Canadian Construction Project Procurement","year":2025,"lang":"","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Greenhouse gas; Extraction (chemistry); Procurement; Nuclear decommissioning; Production (economics)","score_opus":0.04258144262534063,"score_gpt":0.3738093750950767,"score_spread":0.3312279324697361,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127908654","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9029798,0.0008181032,0.038936738,0.00037622213,0.000046632766,0.00041430895,0.0275639,0.0025011657,0.026363188],"genre_scores_gemma":[0.8508666,0.0011942008,0.0999949,0.00007278145,0.000011256308,0.00031339965,0.03221017,0.0002564317,0.015080266],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922884,0.00004800949,0.00003069872,0.000100384954,0.00047471732,0.00011739034],"domain_scores_gemma":[0.9988937,0.00020490648,0.000059425955,0.00004614942,0.0007554922,0.000040350016],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055100035,0.00060334784,0.00032562454,0.004666015,0.0010786025,0.0010112484,0.0005134384,0.00032758148,0.00256934],"category_scores_gemma":[0.0018029363,0.00025172863,0.0005754122,0.0069687767,0.00032046108,0.0003288428,0.000675733,0.0002833515,0.0006481607],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008197866,0.00039987557,0.2152849,0.0014813525,0.00017823148,0.0022714809,0.0036690654,0.07378506,0.060372137,0.004534307,0.024230236,0.61297363],"study_design_scores_gemma":[0.00006222279,0.00011402513,0.5956806,0.0001797796,0.00014638827,0.00041134655,0.0052757813,0.24930704,0.05920711,0.0015078192,0.08784654,0.0002611939],"about_ca_topic_score_codex":0.84764355,"about_ca_topic_score_gemma":0.90399677,"teacher_disagreement_score":0.15235645,"about_ca_system_score_codex":0.0050073327,"about_ca_system_score_gemma":0.009463347,"threshold_uncertainty_score":0.30650735},"labels":[],"label_agreement":null},{"id":"W7127946319","doi":"10.22260/crc-csce-2025/0046","title":"The Significance of Project Manager Competencies in Recruitment: A Means of Supporting Success in the Construction Industry","year":2025,"lang":"","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Universitat Politècnica de Catalunya; RMIT University; Government of Canada","keywords":"Construction industry; Project manager; Construction management; Project management; Process (computing)","score_opus":0.11996737288408665,"score_gpt":0.40465179085836867,"score_spread":0.284684417974282,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127946319","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8082093,0.0042376723,0.018524721,0.023836892,0.00020463443,0.00073727896,0.000089508045,0.00017186075,0.14398816],"genre_scores_gemma":[0.9886537,0.0008744475,0.0066328016,0.0005047586,0.000034823894,0.00014212057,0.000026248226,0.000012978693,0.0031182733],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9833846,0.009884848,0.0005478532,0.00048726232,0.0040174974,0.0016779755],"domain_scores_gemma":[0.9546674,0.021883762,0.00613031,0.0010956086,0.00695623,0.009266702],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022323377,0.00020858753,0.0002626632,0.002706775,0.003942908,0.004330811,0.0009411518,0.00089009065,0.0027995876],"category_scores_gemma":[0.057777595,0.00026113456,0.00014773278,0.0017442147,0.0032317578,0.0026603788,0.004116453,0.0012494636,0.0005691311],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023761313,0.00065074407,0.2122651,0.001670723,0.000029899717,0.00083508715,0.06818192,0.00066219654,0.0038284357,0.02339224,0.008882139,0.67936385],"study_design_scores_gemma":[0.00006657797,0.0013214379,0.6816646,0.0032690184,0.000052833977,0.0020637664,0.15597373,0.0028852203,0.0049407994,0.01876939,0.12880392,0.00018878201],"about_ca_topic_score_codex":0.013629013,"about_ca_topic_score_gemma":0.03238252,"teacher_disagreement_score":0.022323377,"about_ca_system_score_codex":0.0051412648,"about_ca_system_score_gemma":0.033755206,"threshold_uncertainty_score":0.11805874},"labels":[],"label_agreement":null},{"id":"W7127957127","doi":"10.22260/crc-csce-2025/0105","title":"What are the Technical and Regulatory Tools to Achieve Decarbonization of the Construction Industry in Canada?","year":2025,"lang":"","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Construction industry; Industry 4.0; Production (economics); Electric power industry; Key (lock)","score_opus":0.029942529010709474,"score_gpt":0.29590982986877096,"score_spread":0.2659673008580615,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127957127","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19748421,0.061456207,0.025923686,0.21147844,0.0005636354,0.0005161398,0.0008909782,0.00024283178,0.5014438],"genre_scores_gemma":[0.9060406,0.04609521,0.020330647,0.0042746416,0.00006976969,0.00008889508,0.0002771265,0.000047757865,0.022775276],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99031126,0.0015313472,0.00020120243,0.00031731414,0.005496264,0.002142686],"domain_scores_gemma":[0.9934657,0.001281404,0.0005702841,0.00016278226,0.0036767905,0.000843105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0074207126,0.0005185726,0.00022971841,0.0024865828,0.0061470577,0.008136827,0.0014591119,0.0011856419,0.0024563137],"category_scores_gemma":[0.011085252,0.00028898145,0.00035811015,0.0037680103,0.0061118454,0.0026874281,0.0019169106,0.0018902095,0.00031821668],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000088740555,0.00023855412,0.029632922,0.0022858712,0.000069387526,0.0005359018,0.009045977,0.012859282,0.0048546535,0.4230729,0.027101753,0.49021408],"study_design_scores_gemma":[0.000034926037,0.00016085892,0.13057949,0.004229337,0.00010704687,0.00039131334,0.059433468,0.0052389433,0.008832324,0.044446547,0.74621034,0.00033540526],"about_ca_topic_score_codex":0.9496663,"about_ca_topic_score_gemma":0.9838599,"teacher_disagreement_score":0.09637034,"about_ca_system_score_codex":0.09637034,"about_ca_system_score_gemma":0.2428271,"threshold_uncertainty_score":0.699219},"labels":[],"label_agreement":null},{"id":"W7127989906","doi":"10.22260/crc-csce-2025/0086","title":"Developing KPIs and Measurement Processes to Assess the Impact of Innovation in the Construction Industry: Current Practices and Challenges","year":2025,"lang":"","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Current (fluid); Performance indicator; Process (computing); Measure (data warehouse); Performance measurement","score_opus":0.524334412023292,"score_gpt":0.49100808690231224,"score_spread":0.03332632512097977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127989906","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45895678,0.034152668,0.37984157,0.036576822,0.000843543,0.005412318,0.004451,0.0016436537,0.07812159],"genre_scores_gemma":[0.71050376,0.009359786,0.27281135,0.00089708384,0.00015916827,0.0021370777,0.0018472709,0.0002171238,0.0020674805],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.87037146,0.04773494,0.015218421,0.007447486,0.055623528,0.0036041022],"domain_scores_gemma":[0.60041624,0.14622591,0.037570897,0.021817299,0.18903549,0.0049341335],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.14374581,0.002775027,0.0019860608,0.017706824,0.0042271377,0.018988257,0.007161812,0.0018377318,0.0013216333],"category_scores_gemma":[0.21629356,0.0010653436,0.0010396899,0.019623097,0.008233921,0.011743871,0.0074079665,0.0036309152,0.0008573536],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001434145,0.00037730637,0.19296113,0.0072370386,0.00035266016,0.0001616892,0.03824764,0.0063280375,0.0027760956,0.025119908,0.0071018343,0.7191933],"study_design_scores_gemma":[0.00007533418,0.0013286779,0.5305804,0.022942206,0.00044824343,0.00042115382,0.18150114,0.044127576,0.008680178,0.06022308,0.14875127,0.0009207134],"about_ca_topic_score_codex":0.20327243,"about_ca_topic_score_gemma":0.2106835,"teacher_disagreement_score":0.20327243,"about_ca_system_score_codex":0.030368354,"about_ca_system_score_gemma":0.056384556,"threshold_uncertainty_score":0.76020956},"labels":[],"label_agreement":null},{"id":"W7128012479","doi":"10.22260/crc-csce-2025/0163","title":"A Literature Review on Global Construction Productivity Measurement: A Cross-Sectoral Approach","year":2025,"lang":"","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Production (economics); Work (physics)","score_opus":0.09268535846408214,"score_gpt":0.3829603759901488,"score_spread":0.29027501752606666,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7128012479","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014206572,0.9902892,0.00080927147,0.0026754576,0.00031435382,0.000059902577,0.0005247031,0.000021746317,0.0038846903],"genre_scores_gemma":[0.009032083,0.9879909,0.0012670968,0.0007765278,0.00016044396,0.00006859018,0.00041832123,0.00001091355,0.0002751644],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.9934481,0.0016766672,0.0013982705,0.00079448055,0.0022754024,0.00040713104],"domain_scores_gemma":[0.9602832,0.026773512,0.0034930257,0.0007061279,0.008181066,0.00056295167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008825304,0.0015398213,0.0020659224,0.0385285,0.0015139312,0.005370821,0.0020127976,0.0017961721,0.005584722],"category_scores_gemma":[0.026327532,0.0009240096,0.0023149885,0.063360624,0.0024714048,0.0062791966,0.0027027696,0.0018939594,0.00088208594],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008219339,0.00008057205,0.0053932983,0.21693447,0.0005105532,0.00036556675,0.004702748,0.0009303865,0.0005257832,0.019685457,0.040983688,0.7098054],"study_design_scores_gemma":[0.000014294591,0.00012260178,0.02812866,0.3858208,0.001619547,0.00074812997,0.0084052775,0.00045100457,0.00043970582,0.0058324323,0.56831753,0.00009999425],"about_ca_topic_score_codex":0.056505375,"about_ca_topic_score_gemma":0.08611896,"teacher_disagreement_score":0.056505375,"about_ca_system_score_codex":0.009721238,"about_ca_system_score_gemma":0.027517485,"threshold_uncertainty_score":0.11235297},"labels":[],"label_agreement":null},{"id":"W7128065957","doi":"10.22260/crc-csce-2025/0079","title":"Stakeholders Integration in Offsite Construction Supply Chain: Flows and Relationships for Different Project Delivery Methods","year":2025,"lang":"","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Research Council Canada","keywords":"Relation (database); Key (lock); Supply chain; Construction management","score_opus":0.21839065445151554,"score_gpt":0.4072244358131171,"score_spread":0.1888337813616016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7128065957","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9313099,0.00048409222,0.040646136,0.00110513,0.000014837496,0.00040873222,0.00018717926,0.000054728982,0.025789289],"genre_scores_gemma":[0.9916747,0.00031357503,0.0063135657,0.000049598835,0.000003829491,0.00012766023,0.00012309955,0.000014278989,0.0013797303],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9940348,0.0032793183,0.00029298948,0.0005139777,0.0012429255,0.000635884],"domain_scores_gemma":[0.9769274,0.016139759,0.0029343683,0.0004745906,0.0029371444,0.0005867889],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008660343,0.000424994,0.00023129971,0.005933313,0.0020427143,0.0047743204,0.00047344188,0.00095362164,0.005024529],"category_scores_gemma":[0.021752063,0.00044949172,0.0005785338,0.0046588476,0.0013392549,0.007438421,0.0026923069,0.0009330079,0.00035715988],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050927856,0.00048694274,0.45359746,0.0011140169,0.00012751346,0.0018753108,0.16729318,0.0070392964,0.009369202,0.07730202,0.0015298522,0.279756],"study_design_scores_gemma":[0.00006811276,0.00069445005,0.4840594,0.0019154414,0.0002539879,0.0009739969,0.3728112,0.040047366,0.0096553415,0.047467235,0.041858006,0.00019550556],"about_ca_topic_score_codex":0.0058627008,"about_ca_topic_score_gemma":0.006502476,"teacher_disagreement_score":0.008660343,"about_ca_system_score_codex":0.0037582403,"about_ca_system_score_gemma":0.0038497308,"threshold_uncertainty_score":0.045800865},"labels":[],"label_agreement":null},{"id":"W7128072329","doi":"10.22260/crc-csce-2025/0161","title":"Towards a Standardized Framework for Measuring Productivity in the Canadian Construction Industry: A Systematic Literature Review","year":2025,"lang":"","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Systematic review; Productivity; Standardization; Work (physics); Variety (cybernetics)","score_opus":0.07501799582021185,"score_gpt":0.37229651217178605,"score_spread":0.2972785163515742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7128072329","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011638585,0.9630915,0.010105593,0.004350432,0.00055649556,0.003138153,0.0048049265,0.000074200034,0.0022399826],"genre_scores_gemma":[0.16441493,0.7629242,0.05781036,0.0029964221,0.00020806394,0.005613779,0.00550131,0.000064092324,0.0004668879],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.93794966,0.014346016,0.018851485,0.0048923246,0.022130972,0.001829512],"domain_scores_gemma":[0.797422,0.10348163,0.021592619,0.0052924515,0.06936291,0.0028484913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.10246641,0.002414362,0.006875138,0.06484097,0.00439571,0.012037107,0.006819681,0.0031787737,0.0017165706],"category_scores_gemma":[0.21197042,0.0014551731,0.007014861,0.064995505,0.004600263,0.0062287967,0.006556881,0.002924847,0.00023653486],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018736189,0.00015805253,0.03290498,0.59687704,0.009581185,0.00028866978,0.006740848,0.0023357994,0.00081197865,0.0077958833,0.011800333,0.3305178],"study_design_scores_gemma":[0.00018043566,0.00022213065,0.067907415,0.7959052,0.037016463,0.00035108754,0.009051037,0.0018369148,0.000918955,0.0036270914,0.082628325,0.0003549895],"about_ca_topic_score_codex":0.63251334,"about_ca_topic_score_gemma":0.82356834,"teacher_disagreement_score":0.9417821,"about_ca_system_score_codex":0.058217887,"about_ca_system_score_gemma":0.28211027,"threshold_uncertainty_score":0.7393017},"labels":[],"label_agreement":null},{"id":"W7132941382","doi":"","title":"Social Equity in Infrastructure Planning and Delivery? Introducing An Innovative Tool Developed for the City of Toronto","year":2022,"lang":"","type":"dissertation","venue":"TSpace","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Equity (law); General partnership; Urban planning; Project commissioning; Transportation planning; Social equality; Project team","score_opus":0.12109887604040188,"score_gpt":0.47667802955579547,"score_spread":0.3555791535153936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7132941382","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47804433,0.0017032615,0.16052882,0.03668537,0.0010312205,0.0026556419,0.008754234,0.003618192,0.30697888],"genre_scores_gemma":[0.76108766,0.0014963166,0.20975845,0.000548725,0.00008659111,0.0010296095,0.0027981387,0.000348901,0.022845576],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99421084,0.0026107747,0.00039654752,0.0004136433,0.00174321,0.0006250565],"domain_scores_gemma":[0.98540133,0.007361773,0.0010266133,0.0008735555,0.0035919894,0.0017448256],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007623898,0.0007007084,0.00033030604,0.0033569739,0.0033721786,0.00923659,0.0011065671,0.00082177063,0.008870957],"category_scores_gemma":[0.022495352,0.00038704916,0.00042686574,0.0063889623,0.002045542,0.0035790168,0.003413916,0.00094239105,0.0011193708],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021578974,0.0003556279,0.09042735,0.0014101828,0.00009760024,0.00096782314,0.1025663,0.010625942,0.0035461308,0.10423106,0.14392686,0.5416293],"study_design_scores_gemma":[0.00010781277,0.00037914352,0.10584631,0.0022445854,0.00018433626,0.00036497746,0.1344543,0.025768252,0.00535478,0.018233042,0.706643,0.00041950477],"about_ca_topic_score_codex":0.39717636,"about_ca_topic_score_gemma":0.60148627,"teacher_disagreement_score":0.6028236,"about_ca_system_score_codex":0.024290169,"about_ca_system_score_gemma":0.033086956,"threshold_uncertainty_score":0.78972906},"labels":[],"label_agreement":null},{"id":"W7133027765","doi":"","title":"Designing a vendor management procedure for engineering, procurement and construction management projects","year":2018,"lang":"en","type":"dissertation","venue":"Trepo - Institutional Repository of Tampere University","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Vendor; Procurement; Project management; Work (physics); Construction management; Program management; Construction industry; Empirical research; Request for proposal","score_opus":0.03171270449481012,"score_gpt":0.27369675517013015,"score_spread":0.24198405067532003,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7133027765","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07160375,0.0006399553,0.8762403,0.0031166496,0.00032649704,0.016459547,0.00023643102,0.0023773198,0.02899948],"genre_scores_gemma":[0.08493123,0.00057135854,0.90070933,0.00027128312,0.00006782803,0.0075198137,0.00021270689,0.00020329293,0.005513047],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9593952,0.025640499,0.0038942993,0.002389882,0.00729307,0.001387133],"domain_scores_gemma":[0.9446705,0.024507716,0.008545071,0.007427418,0.012482041,0.0023671056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.04508023,0.0008843278,0.0005701926,0.007283504,0.0058454396,0.0057272804,0.0030596938,0.0027057016,0.006342121],"category_scores_gemma":[0.072509885,0.0013750958,0.000809916,0.0042133247,0.003177133,0.007271426,0.0050218743,0.002594484,0.006065549],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021498585,0.0013622687,0.011822763,0.0018848458,0.00004570142,0.0019158832,0.06260696,0.0035028737,0.02504944,0.069169745,0.01574124,0.80668324],"study_design_scores_gemma":[0.00036064262,0.0043252483,0.04084788,0.005369054,0.00017261948,0.0045607546,0.08404671,0.018989563,0.041980516,0.073807046,0.7244672,0.0010727734],"about_ca_topic_score_codex":0.0012670665,"about_ca_topic_score_gemma":0.002229432,"teacher_disagreement_score":0.04508023,"about_ca_system_score_codex":0.0031855695,"about_ca_system_score_gemma":0.01723126,"threshold_uncertainty_score":0.23840988},"labels":[],"label_agreement":null},{"id":"W7133036058","doi":"","title":"Development of Integrated Decision Support Framework for Payment Management and Negotiation in Construction Projects","year":2024,"lang":"","type":"dissertation","venue":"TSpace","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hudbay Minerals (Canada)","funders":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","keywords":"Payment; Negotiation; Cash flow; Process (computing); Decision support system; Key (lock); Risk management","score_opus":0.05596902383076239,"score_gpt":0.3986854326900525,"score_spread":0.3427164088592901,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7133036058","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007885498,0.00012881545,0.9848512,0.0004898704,0.000039275215,0.00039148878,0.00014162378,0.0005550329,0.0055172397],"genre_scores_gemma":[0.23847418,0.00034597123,0.75727344,0.00012170426,0.000041290907,0.0010718696,0.00036299578,0.000053343774,0.002255192],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969984,0.0012252457,0.00032979305,0.00039953247,0.00074869016,0.00029839957],"domain_scores_gemma":[0.9981881,0.000990837,0.00016603076,0.00009338064,0.00041808494,0.00014355849],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005140884,0.000984883,0.0010240118,0.0015698165,0.0012861823,0.004204341,0.0029350745,0.0021907664,0.0042215693],"category_scores_gemma":[0.0058246353,0.0005926557,0.0019160914,0.0012814514,0.0010115809,0.0027555984,0.0029699774,0.0022880393,0.0005876051],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008651475,0.00021241799,0.0016104262,0.00021694206,0.000077112956,0.00045946392,0.00074418855,0.74034595,0.0022445903,0.18532746,0.0015888253,0.06708623],"study_design_scores_gemma":[0.000027891057,0.000036569774,0.00013499479,0.000055034445,0.000023954906,0.000040805833,0.00014903181,0.9649678,0.0007040174,0.028113868,0.005723665,0.000022257396],"about_ca_topic_score_codex":0.011122789,"about_ca_topic_score_gemma":0.008692291,"teacher_disagreement_score":0.011122789,"about_ca_system_score_codex":0.002222636,"about_ca_system_score_gemma":0.005011271,"threshold_uncertainty_score":0.027187943},"labels":[],"label_agreement":null},{"id":"W7133228626","doi":"10.32628/ijsrst25126493","title":"LLM-Augmented IT Project Management : Intelligent Risk Assessment and Automated Documentation Systems","year":2025,"lang":"","type":"article","venue":"International Journal of Scientific Research in Science and Technology","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Documentation; Risk management; Project risk management; Project management triangle; Project management; IT risk management; Risk management plan; Project charter; Risk assessment","score_opus":0.11538518109320299,"score_gpt":0.5295488100158852,"score_spread":0.41416362892268216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7133228626","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.088917196,0.0020037447,0.86576396,0.0042824997,0.000095703355,0.0004265529,0.00029586666,0.002485046,0.035729364],"genre_scores_gemma":[0.59921575,0.0007577046,0.3969918,0.00015718918,0.00003779602,0.00022635382,0.00030073096,0.00009283666,0.0022198558],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9877912,0.007614423,0.001085126,0.0009169138,0.002299827,0.00029249533],"domain_scores_gemma":[0.9803796,0.009207819,0.004515803,0.0030604517,0.0024423618,0.00039408798],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011168985,0.00074812025,0.00050437753,0.0057953023,0.0010517967,0.008123421,0.0014635357,0.0011482489,0.0021914928],"category_scores_gemma":[0.029141258,0.00052653806,0.00079373893,0.0035665415,0.0025219964,0.009564773,0.0049516074,0.0012299288,0.0005994461],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018229781,0.00028279948,0.023435252,0.0011391838,0.00015202326,0.00041463636,0.01065558,0.049651105,0.004373629,0.19891897,0.0034253434,0.70736915],"study_design_scores_gemma":[0.000081144,0.00054618454,0.021973504,0.0029592903,0.00023054724,0.00084281916,0.012878606,0.4303731,0.0109839775,0.41701397,0.10184164,0.00027526607],"about_ca_topic_score_codex":0.0021263803,"about_ca_topic_score_gemma":0.0022306948,"teacher_disagreement_score":0.011168985,"about_ca_system_score_codex":0.0032903606,"about_ca_system_score_gemma":0.0042151175,"threshold_uncertainty_score":0.059067965},"labels":[],"label_agreement":null},{"id":"W7133415207","doi":"","title":"Technological and relational positioning : the main dimensions of Belgian firms working on projects","year":2000,"lang":"en","type":"article","venue":"ORBi UMONS","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Work (physics); Process (computing); Field (mathematics); Government (linguistics); Key (lock)","score_opus":0.072595450844561,"score_gpt":0.3117393862060551,"score_spread":0.23914393536149414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7133415207","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9975165,0.00032945094,0.00007435342,0.00014238077,0.0000032905123,0.0000039260995,0.00009659707,0.0000015435269,0.0018318783],"genre_scores_gemma":[0.99930704,0.00008839624,0.00003184253,0.000012145255,0.0000025042605,0.000002086573,0.00007139749,0.0000012448975,0.00048330167],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9976368,0.00074820104,0.0001277393,0.00021376627,0.00044129466,0.0008321757],"domain_scores_gemma":[0.9939936,0.0016793214,0.0022769917,0.00014256626,0.0005260567,0.0013814801],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016889144,0.00021761331,0.0002364715,0.0018712805,0.0010997426,0.0030324084,0.00051422796,0.00077570917,0.004034158],"category_scores_gemma":[0.00517366,0.00020095089,0.00020089898,0.0037910056,0.0011857615,0.0008490138,0.0012804741,0.00056053844,0.0004187847],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023491442,0.00015019804,0.95473343,0.000042941,0.000069109905,0.00016092397,0.018447714,0.00044307558,0.00069940096,0.0014252553,0.00062814605,0.022964878],"study_design_scores_gemma":[0.0000024978142,0.000033123386,0.98318154,0.000019558367,0.000009287411,0.000038633352,0.015201969,0.00014608788,0.000049622056,0.00008641811,0.0012245718,0.0000067510227],"about_ca_topic_score_codex":0.09175984,"about_ca_topic_score_gemma":0.13893554,"teacher_disagreement_score":0.09175984,"about_ca_system_score_codex":0.0028076877,"about_ca_system_score_gemma":0.0018340285,"threshold_uncertainty_score":0.18245149},"labels":[],"label_agreement":null},{"id":"W7133450793","doi":"","title":"A strategic approach to industrial construction firms in Belgium","year":2002,"lang":"en","type":"article","venue":"ORBi UMONS","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"","keywords":"Process (computing); Work (physics); Strategic planning; Government (linguistics)","score_opus":0.22608535237309926,"score_gpt":0.33395365600680044,"score_spread":0.10786830363370117,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7133450793","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6594387,0.0033274088,0.007962655,0.012884121,0.0001756031,0.00025444085,0.00018850695,0.00009271053,0.31567574],"genre_scores_gemma":[0.9791261,0.00046820933,0.0016586564,0.00016626148,0.0000135862665,0.000037892434,0.000050573934,0.000011510859,0.018467229],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9940579,0.0036693846,0.00014990725,0.00026522973,0.00088791025,0.0009696187],"domain_scores_gemma":[0.99616855,0.0019029076,0.00027145245,0.00009315715,0.00096427125,0.0005996073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026203326,0.0002027763,0.00022134441,0.0023880838,0.004420978,0.008044458,0.00077671476,0.0018036084,0.0069531333],"category_scores_gemma":[0.006496629,0.000273453,0.00014996334,0.003690459,0.0021633336,0.0015015869,0.0012308159,0.00070078624,0.0006166606],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004453337,0.0005883052,0.031290647,0.00061975897,0.00005550124,0.007493808,0.041965127,0.038671695,0.0032340062,0.5928408,0.0366752,0.24611984],"study_design_scores_gemma":[0.00009799369,0.00038429466,0.058894835,0.00058801763,0.00004100425,0.0014561295,0.18955266,0.029450541,0.0031357547,0.12712598,0.5891328,0.00014003667],"about_ca_topic_score_codex":0.066485904,"about_ca_topic_score_gemma":0.108419895,"teacher_disagreement_score":0.066485904,"about_ca_system_score_codex":0.013766519,"about_ca_system_score_gemma":0.018117301,"threshold_uncertainty_score":0.13219786},"labels":[],"label_agreement":null},{"id":"W7133469033","doi":"","title":"Specific dimensions of projects marketing in the construciton industry","year":2001,"lang":"en","type":"article","venue":"ORBi UMONS","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"","keywords":"Production (economics); Marketing research; Work (physics); Key (lock); Quality (philosophy)","score_opus":0.10224327561637031,"score_gpt":0.34275283674322843,"score_spread":0.24050956112685812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7133469033","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9080303,0.0009925608,0.003357982,0.0012500003,0.000015342603,0.0001212259,0.00009007111,0.000015607624,0.086127],"genre_scores_gemma":[0.9979359,0.00019357576,0.00062792515,0.000028105336,0.000008691827,0.000020762685,0.000022339656,0.0000020420382,0.0011607812],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9985556,0.0006272082,0.00006152719,0.00008602899,0.0003353453,0.00033424795],"domain_scores_gemma":[0.9945305,0.0027061312,0.0008787021,0.00015472872,0.0005833106,0.0011465562],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013025356,0.00028690713,0.00021666942,0.002244861,0.0014921707,0.005591354,0.00034045288,0.001130325,0.007289868],"category_scores_gemma":[0.005048371,0.00024796778,0.00034054313,0.002133985,0.0026206619,0.0029433712,0.0017200207,0.0010593665,0.0002626409],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00078637205,0.0012423586,0.48101288,0.0005498231,0.00015231692,0.00062194956,0.018651528,0.006600804,0.005804712,0.32610315,0.002614458,0.15585965],"study_design_scores_gemma":[0.000033260185,0.00028723842,0.85577387,0.0002589129,0.00008686038,0.00037858656,0.047189403,0.009820518,0.0016315526,0.070840836,0.013633372,0.00006549866],"about_ca_topic_score_codex":0.0035599812,"about_ca_topic_score_gemma":0.012139534,"teacher_disagreement_score":0.007289868,"about_ca_system_score_codex":0.0041330573,"about_ca_system_score_gemma":0.0020306604,"threshold_uncertainty_score":0.029987574},"labels":[],"label_agreement":null},{"id":"W7133540946","doi":"10.23762/fso_vol12_no3_3","title":"The Impact of Varying Styles of Leadership on Team Dynamics and Project Success","year":2024,"lang":"en","type":"article","venue":"DOAJ (DOAJ: Directory of Open Access Journals)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Yorkville University","funders":"","keywords":"Servant leadership; Leadership style; Agile software development; Shared leadership; Dynamics (music); Structural equation modeling; Autocracy; Transactional leadership","score_opus":0.5053716166160759,"score_gpt":0.6179089148213238,"score_spread":0.11253729820524794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7133540946","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9981627,0.00004112421,0.0004364674,0.000048446273,0.0000040003642,0.000014570116,0.000015392545,0.0000028884056,0.001274488],"genre_scores_gemma":[0.9995079,0.00003493317,0.00029869197,0.000008154053,0.0000043658406,0.000012838149,0.000015046365,0.0000022004492,0.00011585992],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99117684,0.0059267255,0.00040703826,0.00028830432,0.0015702043,0.00063092884],"domain_scores_gemma":[0.9470937,0.03352633,0.009045275,0.002216008,0.0023438544,0.005774799],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007245632,0.00022833135,0.00019489434,0.0008943183,0.00047398964,0.0012300964,0.000267715,0.00021087904,0.001431822],"category_scores_gemma":[0.038796086,0.0001507602,0.00029849753,0.0005167607,0.0007191628,0.00063273724,0.001302511,0.00050843775,0.0001815863],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001621111,0.00026794084,0.962661,0.000039513172,0.000093386276,0.00010635288,0.0029159943,0.0005154544,0.00084970606,0.00028022096,0.00012080692,0.03198745],"study_design_scores_gemma":[0.000013428528,0.0004875684,0.99463487,0.00002265657,0.000018655974,0.00011819804,0.002725043,0.001054681,0.00025679098,0.00027821917,0.00037907297,0.00001088269],"about_ca_topic_score_codex":0.00069936784,"about_ca_topic_score_gemma":0.001919995,"teacher_disagreement_score":0.007245632,"about_ca_system_score_codex":0.00044230683,"about_ca_system_score_gemma":0.00092361704,"threshold_uncertainty_score":0.03831899},"labels":[],"label_agreement":null},{"id":"W7140152836","doi":"","title":"A Framework for Enhancing Engineering Deliverables to Improve Construction Performance in Oil and Gas Projects","year":2018,"lang":"en","type":"dissertation","venue":"Open MIND","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Deliverable; Schedule; Interview; Petroleum industry; Process (computing); Cost overrun; Root cause; Project management; Capital cost; Data collection","score_opus":0.054582062835143094,"score_gpt":0.3618858448616808,"score_spread":0.3073037820265377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7140152836","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.049037024,0.0029946838,0.6203003,0.048875786,0.00051245216,0.003754592,0.00039519687,0.0011943169,0.27293566],"genre_scores_gemma":[0.35497084,0.0016544898,0.6277458,0.00093486795,0.00008394359,0.0018506758,0.00023957668,0.00015657756,0.012363207],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.96367836,0.025933485,0.0015862924,0.0017114362,0.0046755928,0.0024149383],"domain_scores_gemma":[0.9726944,0.015374885,0.0026792597,0.0012760735,0.0050534955,0.0029218558],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.040019322,0.0020569956,0.00064645003,0.010819592,0.006221917,0.014334963,0.004815492,0.0045451345,0.00556268],"category_scores_gemma":[0.029288458,0.0010022273,0.0017015185,0.005578298,0.014857715,0.009846448,0.011887529,0.0040561543,0.0012093005],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055825487,0.00053796323,0.0040724254,0.0010749798,0.00004329306,0.0013275406,0.042847853,0.012546459,0.0016981172,0.8425501,0.0068161306,0.08642934],"study_design_scores_gemma":[0.00014357561,0.0006736426,0.009366125,0.00484264,0.00016222244,0.00067349226,0.09693233,0.041072447,0.0029564237,0.47733495,0.36555648,0.00028563142],"about_ca_topic_score_codex":0.03339925,"about_ca_topic_score_gemma":0.054270968,"teacher_disagreement_score":0.040019322,"about_ca_system_score_codex":0.022339564,"about_ca_system_score_gemma":0.03906595,"threshold_uncertainty_score":0.21164489},"labels":[],"label_agreement":null},{"id":"W7140610238","doi":"10.1109/3ict68299.2025.11442070","title":"Achieving Canadian Housing Project Success through Artificial Intelligence, Risk Monitoring and Controls","year":2025,"lang":"","type":"article","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Risk management; Risk assessment; Control (management)","score_opus":0.09067548398481412,"score_gpt":0.38867123294320827,"score_spread":0.29799574895839415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7140610238","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9438863,0.00034929966,0.0030142085,0.0015151977,0.000013987024,0.00013715334,0.000118602286,0.00007070001,0.050894637],"genre_scores_gemma":[0.99532986,0.00026689545,0.001996417,0.00003934933,0.0000030543124,0.000021730328,0.00006110414,0.0000064012497,0.0022751351],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99532276,0.0014634334,0.00013398971,0.00029046825,0.0018899805,0.000899395],"domain_scores_gemma":[0.992728,0.0016614744,0.0014036256,0.00034301082,0.0024469127,0.0014168817],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039844285,0.00049564557,0.0002576215,0.0015696677,0.0038883195,0.004928304,0.00087589456,0.00031871066,0.0020814647],"category_scores_gemma":[0.012011435,0.00026606128,0.00025631246,0.0017760424,0.0020646958,0.0009799144,0.0021797265,0.00053771416,0.00023631644],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026828382,0.0004953668,0.6325021,0.00032835273,0.00013736851,0.0005613801,0.028913656,0.008776606,0.003403321,0.014295404,0.0088012405,0.3015169],"study_design_scores_gemma":[0.00003186352,0.00032912858,0.91138184,0.00022863566,0.000095758776,0.00015885397,0.035203125,0.010953401,0.0024103262,0.002526923,0.03656791,0.000112332156],"about_ca_topic_score_codex":0.86566633,"about_ca_topic_score_gemma":0.93558013,"teacher_disagreement_score":0.13433367,"about_ca_system_score_codex":0.021628315,"about_ca_system_score_gemma":0.047460243,"threshold_uncertainty_score":0.27024955},"labels":[],"label_agreement":null},{"id":"W7141796864","doi":"10.71465/ajccee.173","title":"Application of Machine Learning in Construction Project Management","year":2020,"lang":"","type":"article","venue":"American Journal Of Civil Construction And Environmental Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Transformative learning; Project management; Construction management; Construction industry; Workforce; Automation; Key (lock); Analytics; Pre-construction services","score_opus":0.01038982322160374,"score_gpt":0.2286101806051678,"score_spread":0.21822035738356407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7141796864","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17136464,0.012356137,0.73108,0.020062806,0.0005750811,0.00041369305,0.00032382066,0.00075663626,0.063067146],"genre_scores_gemma":[0.90109366,0.0033619602,0.09293733,0.000405304,0.00021491687,0.00009496011,0.00011034965,0.00002549823,0.0017559557],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99654657,0.0022418457,0.00015692429,0.00023155684,0.0006706329,0.00015252968],"domain_scores_gemma":[0.9889008,0.008759987,0.0006205571,0.00044349427,0.0010768358,0.00019833287],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004116152,0.00055077695,0.0004352829,0.0019155955,0.0006470735,0.0020866084,0.0007211067,0.0010670181,0.0015525749],"category_scores_gemma":[0.013022739,0.00022714036,0.00033054705,0.0025857931,0.00089387223,0.0013229897,0.0012466005,0.0012118027,0.00031704537],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013672878,0.00047899492,0.026756682,0.00035464205,0.00013275242,0.00024685933,0.00041855327,0.41771343,0.0012072517,0.040200435,0.0041029314,0.5082507],"study_design_scores_gemma":[0.0000195944,0.00011823157,0.0054274215,0.00017842103,0.00002264666,0.00008284507,0.00031767637,0.91700983,0.002059519,0.062950045,0.011772751,0.00004098169],"about_ca_topic_score_codex":0.0048802067,"about_ca_topic_score_gemma":0.004368054,"teacher_disagreement_score":0.0048802067,"about_ca_system_score_codex":0.0020036013,"about_ca_system_score_gemma":0.0025939667,"threshold_uncertainty_score":0.02176851},"labels":[],"label_agreement":null},{"id":"W7154870446","doi":"","title":"Estimating","year":2022,"lang":"en","type":"article","venue":"Research Explorer (The University of Manchester)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Civil servants; Norwegian; Corporate governance; Field (mathematics); Public management; Public sector","score_opus":0.313627673307233,"score_gpt":0.4033762225080068,"score_spread":0.0897485492007738,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7154870446","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008486397,0.0020434612,0.050282516,0.006441842,0.0025942863,0.0007676639,0.013467905,0.0023476363,0.9135683],"genre_scores_gemma":[0.1297371,0.004513501,0.049016535,0.0030885949,0.0008661468,0.001086591,0.027330147,0.001549641,0.7828117],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99575657,0.0008297586,0.00024612556,0.0009742452,0.0017622788,0.00043102686],"domain_scores_gemma":[0.9949956,0.0009770537,0.00033148963,0.00096703175,0.002433567,0.00029517675],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0032254953,0.0009986593,0.00062398036,0.0027072357,0.0014994422,0.0063498546,0.0017519239,0.0018252835,0.29436788],"category_scores_gemma":[0.016863955,0.00040067642,0.00093293365,0.0037312948,0.0007562206,0.0051984596,0.002798278,0.001618928,0.17577933],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000176039,0.000110753135,0.0076579037,0.00052160496,0.00005928454,0.00018424026,0.00096399663,0.002063573,0.00087930606,0.11461487,0.3649355,0.50783294],"study_design_scores_gemma":[0.000016211847,0.000044608973,0.0038453636,0.00028239592,0.00002392282,0.00019294699,0.00093987247,0.0015077449,0.0007160685,0.021665877,0.9707381,0.000026789043],"about_ca_topic_score_codex":0.00831828,"about_ca_topic_score_gemma":0.0073966216,"teacher_disagreement_score":0.7056321,"about_ca_system_score_codex":0.0022323583,"about_ca_system_score_gemma":0.002998819,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W7154997767","doi":"10.1108/book-978-1-60752-316-120251020","title":"Managing and Sustaining Expectations of Innovative Ict Integration in Development Projects","year":2009,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Information and Communications Technology; Information technology; Key (lock); Work (physics)","score_opus":0.10121715540769713,"score_gpt":0.3503775192147341,"score_spread":0.24916036380703696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7154997767","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15722984,0.0028452468,0.13370171,0.008928901,0.00033690664,0.00013611908,0.00008592237,0.000242028,0.69649327],"genre_scores_gemma":[0.8647662,0.0021409513,0.030054359,0.0004533574,0.00010586285,0.00015879443,0.00011744498,0.00016099232,0.10204201],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9985964,0.00042810562,0.00004911989,0.00009307575,0.00067607616,0.00015719714],"domain_scores_gemma":[0.9978631,0.0012341568,0.0001936872,0.00011145923,0.00038633714,0.00021122461],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002180321,0.00026547062,0.00015893132,0.0003679112,0.00079439534,0.005691814,0.0007516806,0.00096644997,0.003592213],"category_scores_gemma":[0.005900551,0.00021885533,0.00018543091,0.0005510477,0.001355234,0.0042281835,0.0017798108,0.0014384257,0.00083007984],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053103515,0.00016285638,0.005927957,0.00023899182,0.000015241918,0.00040828757,0.020040037,0.0088855745,0.0033882658,0.50877535,0.022685615,0.42941874],"study_design_scores_gemma":[0.000020511,0.00023241498,0.017806761,0.0010059093,0.000025599,0.0005543558,0.033651885,0.040265184,0.008391771,0.54766786,0.35028592,0.000091910595],"about_ca_topic_score_codex":0.0016920713,"about_ca_topic_score_gemma":0.0026789682,"teacher_disagreement_score":0.005691814,"about_ca_system_score_codex":0.0023784868,"about_ca_system_score_gemma":0.0033423223,"threshold_uncertainty_score":0.017257273},"labels":[],"label_agreement":null},{"id":"W7161603836","doi":"10.55627/ijss.004.02.1612","title":"Governing Digital Transformation: An Integrated Framework for Project Management, Scheduling, and Change Leadership","year":2024,"lang":"","type":"article","venue":"International Journal of Social Studies","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute on Governance","funders":"","keywords":"Project management; Conceptual framework; Digital transformation; Multinational corporation; Change management (ITSM); Project management triangle; Extreme project management; Project stakeholder; Project charter","score_opus":0.3935929173573673,"score_gpt":0.4776587103997705,"score_spread":0.08406579304240319,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7161603836","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009473331,0.0012189894,0.86833745,0.016398028,0.0002413737,0.000854381,0.000092507835,0.00031476503,0.10306914],"genre_scores_gemma":[0.2849846,0.0015203035,0.6996486,0.0006774077,0.00016552713,0.0019501955,0.00015421337,0.000113123126,0.010785987],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98592794,0.009579444,0.0007264466,0.0009902874,0.0018554198,0.0009203815],"domain_scores_gemma":[0.99440306,0.0023350625,0.0006500887,0.000766625,0.0009016757,0.00094356394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017025474,0.0012818988,0.0005978828,0.005791199,0.005865861,0.01587812,0.0035830117,0.0038855965,0.0039327634],"category_scores_gemma":[0.009203477,0.0007492097,0.0011175404,0.0040317485,0.021390438,0.012528144,0.007628982,0.0036744599,0.0009249279],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000525071,0.000034984758,0.00034930988,0.00007602849,0.000006954489,0.0000711722,0.0035335245,0.0056881835,0.0001304669,0.9676828,0.0015214552,0.02089988],"study_design_scores_gemma":[0.000025454747,0.00009093606,0.0007690518,0.00043498733,0.000015207582,0.00015239065,0.0094755925,0.018415753,0.00033779466,0.84344053,0.12679844,0.0000438335],"about_ca_topic_score_codex":0.009330728,"about_ca_topic_score_gemma":0.011825707,"teacher_disagreement_score":0.017025474,"about_ca_system_score_codex":0.013486885,"about_ca_system_score_gemma":0.02411001,"threshold_uncertainty_score":0.097854674},"labels":[],"label_agreement":null},{"id":"W7162107367","doi":"10.13182/t140-48107","title":"Need for Industrial Integrated Project Delivery Training to Manage New Nuclear Construction Challenges","year":2025,"lang":"","type":"article","venue":"Transactions of the American Nuclear Society","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Training (meteorology); Integrated project delivery; Nuclear industry; Construction management; Nuclear power; Construction industry","score_opus":0.12157287421336649,"score_gpt":0.3348781226589734,"score_spread":0.2133052484456069,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7162107367","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15139766,0.0041942657,0.080632605,0.572174,0.0046218354,0.0009841427,0.000382781,0.0039025124,0.1817103],"genre_scores_gemma":[0.83113474,0.002578733,0.099309124,0.032120414,0.0018447126,0.00072198,0.0006139356,0.0002837249,0.031392623],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99596584,0.0011440052,0.00017264782,0.00042025396,0.0011704412,0.0011268357],"domain_scores_gemma":[0.97189283,0.0066314815,0.002258502,0.0014510638,0.0067286957,0.0110374335],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009102302,0.00036535115,0.00042639035,0.00094934826,0.0027106572,0.0058027604,0.0023451373,0.004940521,0.04248069],"category_scores_gemma":[0.0187318,0.00033294596,0.000531261,0.00058896793,0.0011868507,0.0040187985,0.0043848027,0.005882329,0.0048772967],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036541358,0.0037462336,0.01776031,0.0013973409,0.00008697312,0.00058424385,0.0016523474,0.014449428,0.011544606,0.04676419,0.15915714,0.74249184],"study_design_scores_gemma":[0.00065093447,0.0023762237,0.08908626,0.002864412,0.00014958132,0.0023486025,0.022946026,0.043987624,0.0071497946,0.0629733,0.7651688,0.00029850562],"about_ca_topic_score_codex":0.005174261,"about_ca_topic_score_gemma":0.011539599,"teacher_disagreement_score":0.04248069,"about_ca_system_score_codex":0.0039158612,"about_ca_system_score_gemma":0.04687125,"threshold_uncertainty_score":0.14211202},"labels":[],"label_agreement":null},{"id":"W73042162","doi":"10.1007/978-3-642-37270-4_34","title":"Research on Contractor’s Claims Caused by Extension of Time","year":2013,"lang":"en","type":"book-chapter","venue":"","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Extension (predicate logic); Schedule; Key (lock); Process (computing); Operations research; Perspective (graphical); Process management; Computer science; Operations management; Engineering; Computer security","score_opus":0.2219687122618006,"score_gpt":0.4215985210499337,"score_spread":0.19962980878813313,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W73042162","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2188763,0.015222749,0.012432618,0.023209771,0.0011239526,0.00015712368,0.0003411651,0.00005231298,0.728584],"genre_scores_gemma":[0.88208574,0.0103368275,0.0036003592,0.0017453359,0.0008808965,0.000135556,0.0002964607,0.00006524524,0.10085351],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.98967594,0.00345751,0.0005951814,0.0009581418,0.0043253177,0.0009878473],"domain_scores_gemma":[0.9291986,0.055870816,0.0047690663,0.003959071,0.0051461793,0.0010562583],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016668666,0.0004993446,0.0005580763,0.0032282649,0.0030994802,0.0051362743,0.0026423603,0.004766019,0.027946705],"category_scores_gemma":[0.05901878,0.000473021,0.0009503917,0.00401366,0.009479739,0.0086726565,0.00252474,0.0047464385,0.0011163274],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00058335264,0.00040555076,0.0076243505,0.00040633138,0.00008394924,0.00062958396,0.007026796,0.0025482895,0.0012856245,0.88241243,0.016067998,0.08092584],"study_design_scores_gemma":[0.0001244684,0.00048960414,0.03142013,0.0016224677,0.0001813021,0.0010857724,0.015386202,0.006591675,0.004743456,0.73642766,0.20181072,0.00011649714],"about_ca_topic_score_codex":0.009209078,"about_ca_topic_score_gemma":0.0073367925,"teacher_disagreement_score":0.027946705,"about_ca_system_score_codex":0.0050647175,"about_ca_system_score_gemma":0.0057545938,"threshold_uncertainty_score":0.09349108},"labels":[],"label_agreement":null},{"id":"W746031667","doi":"","title":"A STRONG TRUNK + BRANCHES : GRANITE CONSTRUCTION BUILDS ON A CALIFORNIA BASE","year":2003,"lang":"en","type":"article","venue":"Roads & bridges/Roads & bridges (Des Plaines, Ill. Online)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Revenue; Engineering; Quarter (Canadian coin); Work (physics); Renting; Flexibility (engineering); Bridge (graph theory); Resource (disambiguation); Fiscal year; Transport engineering; Civil engineering; Finance; Business; Management; Economics; Archaeology; Geography; Computer science; Mechanical engineering","score_opus":0.07260138529916758,"score_gpt":0.32660772163114,"score_spread":0.2540063363319724,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W746031667","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07933558,0.001689017,0.003988594,0.0073659136,0.00038725566,0.00017792027,0.00056152756,0.0010879518,0.90540624],"genre_scores_gemma":[0.49147135,0.005413464,0.027952354,0.0021269487,0.0002990618,0.00015157738,0.0019144729,0.0006339615,0.4700369],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99926907,0.00007579711,0.000010651083,0.00010982413,0.0003616657,0.00017300562],"domain_scores_gemma":[0.99942195,0.00004467202,0.000037863072,0.000044809152,0.00009171577,0.00035897834],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065796584,0.00044889117,0.00013642227,0.00080968224,0.0028248925,0.0046952004,0.0010075034,0.00066819746,0.03099702],"category_scores_gemma":[0.000753471,0.000292936,0.00020759153,0.0009658244,0.0011711908,0.0015573922,0.0026502612,0.001029698,0.006167466],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018108451,0.0004899228,0.016095793,0.00017005186,0.000018322213,0.00081212504,0.0015584334,0.0027675456,0.0019795825,0.044542074,0.6257912,0.30559388],"study_design_scores_gemma":[0.000041895637,0.00015278178,0.010938672,0.00015725831,0.000017203021,0.0002668325,0.0024278376,0.0010032577,0.00041979147,0.002278541,0.9822655,0.000030413144],"about_ca_topic_score_codex":0.059739362,"about_ca_topic_score_gemma":0.29436508,"teacher_disagreement_score":0.059739362,"about_ca_system_score_codex":0.0032788697,"about_ca_system_score_gemma":0.005028736,"threshold_uncertainty_score":0.118783236},"labels":[],"label_agreement":null},{"id":"W760385336","doi":"","title":"Oregon's Bridge-Delivery Program","year":2007,"lang":"en","type":"article","venue":"Bridges Conversations in Global Politics and Public Policy","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Legislature; Bridge (graph theory); Context (archaeology); Engineering; Business; Process (computing); State (computer science); State legislature; Political science; Computer science; Geography; Law","score_opus":0.06853114807109648,"score_gpt":0.3863278781618017,"score_spread":0.3177967300907052,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W760385336","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034243908,0.00023817724,0.0022644117,0.007327401,0.00033524467,0.00069527107,0.008052551,0.00091975596,0.9459232],"genre_scores_gemma":[0.072472304,0.00078591757,0.005098118,0.002860006,0.00011655937,0.0010631593,0.011278727,0.00021176704,0.90611356],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99937457,0.00005223068,0.000018518647,0.000069541726,0.00035057878,0.00013457648],"domain_scores_gemma":[0.9992638,0.00011644622,0.00003905068,0.000055012228,0.00022858543,0.00029700642],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00087959995,0.00027308566,0.000113826114,0.00076459505,0.0020262704,0.001663134,0.000928426,0.0007194908,0.2063123],"category_scores_gemma":[0.0018487287,0.0002078839,0.00018707807,0.000720826,0.00029769778,0.00097403827,0.0019552584,0.0010533354,0.0275648],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000121504265,0.0009976656,0.0082167825,0.00014177017,0.0000067205574,0.00026061328,0.00042999553,0.00021861304,0.0010816497,0.019712962,0.79127795,0.1775338],"study_design_scores_gemma":[0.00006805795,0.000110196735,0.012300976,0.00007126761,0.000007476574,0.00011466584,0.0005903333,0.0003768223,0.00059450057,0.0012148625,0.98453957,0.000011277323],"about_ca_topic_score_codex":0.022715561,"about_ca_topic_score_gemma":0.07252013,"teacher_disagreement_score":0.2063123,"about_ca_system_score_codex":0.0014829774,"about_ca_system_score_gemma":0.008716266,"threshold_uncertainty_score":0.6901834},"labels":[],"label_agreement":null},{"id":"W807214789","doi":"10.1287/mnsc.1060.0641","title":"Cooperative Planning, Uncertainty, and Managerial Control in Concurrent Design","year":2007,"lang":"en","type":"article","venue":"Management Science","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Rework; Upstream (networking); Downstream (manufacturing); Upstream and downstream (DNA); Scope (computer science); Business; Control (management); Time horizon; Process management; Operations management; Computer science; Engineering; Telecommunications","score_opus":0.08693775039895128,"score_gpt":0.39306355526087944,"score_spread":0.30612580486192814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W807214789","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98515505,0.00024891863,0.009982334,0.0002677678,0.0000066908415,0.000028322012,0.000012049179,0.000015965004,0.0042829006],"genre_scores_gemma":[0.99916506,0.000024571296,0.0006972728,0.000008870444,0.000003703214,0.000009590907,0.000004160468,0.0000013601191,0.0000854068],"study_design_codex":"observational","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9848749,0.008026746,0.00083772413,0.0010586841,0.004006274,0.0011956731],"domain_scores_gemma":[0.8199398,0.12453019,0.04082911,0.0054154973,0.0050269347,0.004258493],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017349785,0.0004610012,0.00037808224,0.0016922824,0.00117199,0.0027007472,0.0007360454,0.00072089065,0.0015991263],"category_scores_gemma":[0.084371224,0.00045259963,0.0003970337,0.0011851151,0.0031005281,0.0021690642,0.0023837336,0.0010643445,0.00009543284],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011120705,0.0012571769,0.7283838,0.00028606277,0.0003799788,0.0005936699,0.026697902,0.057172358,0.0038690807,0.022661874,0.00042414322,0.1571619],"study_design_scores_gemma":[0.0002128636,0.0022188069,0.7883079,0.00022894739,0.0002298509,0.00044973067,0.025158698,0.09386371,0.0036939913,0.07993441,0.005399123,0.00030188682],"about_ca_topic_score_codex":0.005142328,"about_ca_topic_score_gemma":0.0061182966,"teacher_disagreement_score":0.017349785,"about_ca_system_score_codex":0.0029545606,"about_ca_system_score_gemma":0.0029414082,"threshold_uncertainty_score":0.09175551},"labels":[],"label_agreement":null},{"id":"W8169165","doi":"10.1080/07399339409516090","title":"Development of Delays Claims Assessment Model","year":2011,"lang":"en","type":"dissertation","venue":"Health Care For Women International","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Concordia University","keywords":"Damages; Revenue; Computer science; Process (computing); Overhead (engineering); Risk analysis (engineering); Scheduling (production processes); Critical path method; Reliability engineering; Project management; Operations research; Engineering; Operations management; Systems engineering; Business","score_opus":0.11402235117558097,"score_gpt":0.46282970867998613,"score_spread":0.34880735750440517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W8169165","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03737842,0.000552503,0.7944872,0.010496149,0.00023858546,0.0021103413,0.0025355546,0.00057485467,0.15162642],"genre_scores_gemma":[0.58931106,0.00062469713,0.38571557,0.00068440876,0.00025014003,0.0021956041,0.0017392195,0.000071016984,0.019408282],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9894104,0.0050780103,0.0007294278,0.0012652788,0.0028019296,0.0007149538],"domain_scores_gemma":[0.9557024,0.03310709,0.0018174194,0.0018329796,0.0067839213,0.00075622567],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020420738,0.0010164866,0.0009246437,0.0055410685,0.0021986815,0.0066575822,0.0046175625,0.003578753,0.026996305],"category_scores_gemma":[0.054020867,0.0005551187,0.0018699933,0.0034577686,0.0027304098,0.007525795,0.0034033598,0.0032269764,0.003534341],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012994462,0.000310021,0.007319203,0.0002238859,0.000093320814,0.00057097443,0.0014696609,0.033434518,0.0002971372,0.86919403,0.0074024824,0.079554915],"study_design_scores_gemma":[0.000060943894,0.00010905573,0.0014555235,0.0002463367,0.00009513116,0.0003131396,0.001608217,0.36161566,0.00045833195,0.6115292,0.022467392,0.000041091134],"about_ca_topic_score_codex":0.007988033,"about_ca_topic_score_gemma":0.0042790007,"teacher_disagreement_score":0.026996305,"about_ca_system_score_codex":0.004147575,"about_ca_system_score_gemma":0.006619496,"threshold_uncertainty_score":0.10799652},"labels":[],"label_agreement":null},{"id":"W978057523","doi":"","title":"Diagnosing Construction Performance","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Schema (genetic algorithms); Computer science; Risk analysis (engineering); Construction management; Performance measurement; Management science; Data science; Process management; Engineering; Machine learning","score_opus":0.022076612108686878,"score_gpt":0.26737884575007387,"score_spread":0.24530223364138698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W978057523","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3425334,0.0006739006,0.6006437,0.003839799,0.00016763157,0.0010115562,0.0023164605,0.0034600915,0.045353413],"genre_scores_gemma":[0.91062456,0.0004290773,0.08560175,0.00008686703,0.000019098612,0.00016304135,0.0009422446,0.000052497828,0.0020809334],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9896282,0.00302219,0.0010537901,0.0012019502,0.0042767567,0.0008171474],"domain_scores_gemma":[0.97626173,0.010340595,0.005750037,0.0019253176,0.0051515973,0.00057064346],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008065829,0.0016387671,0.0006689927,0.005353149,0.0011540282,0.0042294725,0.0018833831,0.0021973157,0.0039553265],"category_scores_gemma":[0.033974297,0.00047175973,0.0006551388,0.003143344,0.0021108906,0.0047448347,0.0032561803,0.0013979098,0.0008773115],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00056282483,0.0006502722,0.31481698,0.0012547959,0.00019051008,0.0011104579,0.0080630975,0.15647474,0.010855476,0.13745397,0.01056491,0.35800195],"study_design_scores_gemma":[0.00006676956,0.0015425459,0.12779036,0.0011419915,0.00021158923,0.0014214644,0.020672776,0.654355,0.029584438,0.12728381,0.035496052,0.0004332384],"about_ca_topic_score_codex":0.0060503315,"about_ca_topic_score_gemma":0.0059288824,"teacher_disagreement_score":0.008065829,"about_ca_system_score_codex":0.0032798266,"about_ca_system_score_gemma":0.003478958,"threshold_uncertainty_score":0.04265672},"labels":[],"label_agreement":null},{"id":"W99423347","doi":"","title":"Estimating productivity losses due to change orders","year":2000,"lang":"en","type":"dissertation","venue":"Spectrum Research Repository (Concordia University)","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Change order; Productivity; Scope (computer science); Reliability (semiconductor); Work (physics); Statement of work; Operations research; Operations management; Order (exchange); Computer science; Engineering; Project management; Business; Project planning; Economics; Systems engineering","score_opus":0.09782569904810037,"score_gpt":0.3679403784255995,"score_spread":0.2701146793774991,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W99423347","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8170913,0.00020159154,0.17721634,0.00025648696,0.000026255497,0.00011263101,0.00046984595,0.0003216822,0.004303871],"genre_scores_gemma":[0.9892322,0.00014421873,0.008906944,0.000009274881,0.0000064067362,0.000053672164,0.00019653911,0.000016965067,0.0014337455],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9994717,0.00013727474,0.000026356121,0.000108287146,0.0001743741,0.00008192282],"domain_scores_gemma":[0.997951,0.0014481121,0.00028103366,0.00008761697,0.00018443578,0.000047887042],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009662174,0.00075560866,0.00056339445,0.0009189936,0.0002648101,0.0011829196,0.0007476642,0.0007108153,0.0014013535],"category_scores_gemma":[0.005861058,0.00042504605,0.00050637376,0.0007143663,0.0003834058,0.0011688086,0.00054134143,0.00077150017,0.00023530604],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006254209,0.000037949038,0.0051126927,0.000016051265,0.000014157143,0.000030784515,0.000024651368,0.985849,0.00035022062,0.00046861768,0.00011339477,0.007919955],"study_design_scores_gemma":[0.0000023773512,0.000031336698,0.0015833424,0.0000026670457,0.000005175146,0.000008476169,0.000016122076,0.99754095,0.00028878124,0.0004379842,0.00007840689,0.0000043717628],"about_ca_topic_score_codex":0.022162054,"about_ca_topic_score_gemma":0.012273263,"teacher_disagreement_score":0.022162054,"about_ca_system_score_codex":0.0019531054,"about_ca_system_score_gemma":0.0010407453,"threshold_uncertainty_score":0.04406613},"labels":[],"label_agreement":null}]}