{"meta":{"query_hash":"1e90e0904200","filters":{"topic":"Electric Power System Optimization"},"cohort_total":904,"direct_labels_cover":0,"predictions_cover":904,"exported":904,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/1e90e0904200","api":"https://metacan.xera.ac/api/v1/cohort?topic=Electric+Power+System+Optimization"},"results":[{"id":"W144514668","doi":"10.15173/esr.v12i2.457","title":"Restructuring the Regulatory Framework in Developing Countries","year":2004,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Restructuring; Incentive; Developing country; Regulatory reform; Process (computing); Electricity; Industrial organization; Corporate governance; Business; Economics; Electricity market; Economic system; Market economy; Economic growth; Finance; Computer science","score_opus":0.014210790690900721,"score_gpt":0.2526113857444959,"score_spread":0.23840059505359515,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W144514668","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13789883,0.02887687,0.2582202,0.043541275,0.00070064905,0.0005477902,0.0004220024,0.0003206767,0.52947176],"genre_scores_gemma":[0.90436894,0.01650069,0.061357066,0.004042407,0.00019342406,0.0003163211,0.00013354047,0.000036855618,0.013050797],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9965139,0.0016926166,0.00028028124,0.00045034452,0.00072733895,0.00033557144],"domain_scores_gemma":[0.99689156,0.0013181028,0.00050099054,0.00039065175,0.00078523415,0.00011341272],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008523428,0.00025128093,0.00031022902,0.0010954129,0.0013793887,0.0039301845,0.0008611533,0.0019720832,0.0014469905],"category_scores_gemma":[0.007072875,0.00021577673,0.00045715336,0.0012578915,0.0050294967,0.002227175,0.0012420346,0.001968699,0.00020300884],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005672585,0.000014804251,0.00037182588,0.00007401385,0.000004436695,0.00006588022,0.00031124908,0.0062629734,0.00039428394,0.9739949,0.0011735293,0.017326446],"study_design_scores_gemma":[0.000037212772,0.00021015947,0.003661999,0.001114001,0.00003198036,0.0004240992,0.0016378213,0.010799719,0.0027108733,0.6075669,0.37173268,0.00007251214],"about_ca_topic_score_codex":0.010688291,"about_ca_topic_score_gemma":0.006599546,"teacher_disagreement_score":0.010688291,"about_ca_system_score_codex":0.004845092,"about_ca_system_score_gemma":0.011227874,"threshold_uncertainty_score":0.045076787},"labels":[],"label_agreement":null},{"id":"W1493069469","doi":"","title":"How Standard Oil Came to Canada: The Monopolization of Canadian Petroleum Refining, 1989-1998","year":2004,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Monopolization; Refining (metallurgy); Petroleum; Oil refinery; Crude oil; Petroleum engineering; Environmental science; Economics; Natural resource economics; Engineering; Waste management; Geology; Metallurgy; Materials science; Monopoly; Market economy","score_opus":0.01357097191980539,"score_gpt":0.22941985014032068,"score_spread":0.2158488782205153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1493069469","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73124754,0.011590125,0.00082165684,0.04692072,0.00019968698,0.00013069267,0.01778051,0.00006861806,0.19124043],"genre_scores_gemma":[0.9606449,0.0032542434,0.00026593753,0.0012582171,0.00002638935,0.000010711888,0.0018241052,0.000027087184,0.032688454],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976242,0.000054747245,0.00004404728,0.00012782216,0.0011535045,0.0009957311],"domain_scores_gemma":[0.99589527,0.00021978219,0.00035499726,0.00006228688,0.0029903066,0.00047733285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008760047,0.0002459166,0.00034857236,0.0024288185,0.0053123995,0.004996146,0.0010189256,0.0014424195,0.007831131],"category_scores_gemma":[0.005746273,0.00033309453,0.0003981195,0.006651508,0.0023581064,0.0017744749,0.0012872772,0.0017366416,0.0003875609],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013088181,0.00021790327,0.33393618,0.0010845565,0.0005702229,0.002012993,0.016701952,0.010359737,0.003061566,0.2259823,0.23101296,0.17375077],"study_design_scores_gemma":[0.00004055398,0.00004464274,0.6333697,0.00030774876,0.0001426648,0.00018429566,0.017879652,0.0016109197,0.0017962406,0.005010863,0.33950794,0.00010478652],"about_ca_topic_score_codex":0.9972052,"about_ca_topic_score_gemma":0.99921703,"teacher_disagreement_score":0.13418658,"about_ca_system_score_codex":0.13418658,"about_ca_system_score_gemma":0.12614472,"threshold_uncertainty_score":0.97359633},"labels":[],"label_agreement":null},{"id":"W1493792108","doi":"10.1023/a:1023370211456","title":"Uncertainty and Investment in Electricity Generation with an Application to the Case of Hydro-Québec","year":2003,"lang":"en","type":"article","venue":"Annals of Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Alberta Energy; University of Alberta","funders":"","keywords":"Competition (biology); Restructuring; Theory of computation; Computer science; Operations research; Linear programming; Investment (military); Duration (music); Process (computing); Mathematical optimization; Face (sociological concept); Simple (philosophy); Economics; Mathematics; Finance","score_opus":0.06937511628807928,"score_gpt":0.35677123309641456,"score_spread":0.28739611680833527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1493792108","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9391801,0.0051158206,0.0124064125,0.007413967,0.00012049903,0.00008548281,0.0013408404,0.00010523674,0.034231644],"genre_scores_gemma":[0.9928872,0.0010567277,0.0014043516,0.00007624819,0.000030508076,0.000017065955,0.00014064879,0.000015623486,0.0043716915],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994438,0.0002490163,0.00001713078,0.00005520273,0.00006995296,0.0001648398],"domain_scores_gemma":[0.99317086,0.00573018,0.0002578035,0.00010158856,0.00048767182,0.0002519826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020210007,0.00082140265,0.001299532,0.0012807302,0.0019431378,0.0035051906,0.001891456,0.0034151932,0.004329115],"category_scores_gemma":[0.008980054,0.00065797154,0.001060837,0.0029663946,0.0019138714,0.0017589311,0.0012924605,0.0025446392,0.0001251283],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017464464,0.00011306703,0.008326829,0.00007103978,0.00008871399,0.0011101725,0.00015996487,0.9281149,0.00017483678,0.054174803,0.0028142207,0.004676714],"study_design_scores_gemma":[0.000057780242,0.000048044792,0.0056536365,0.00003181065,0.00006218602,0.00008120362,0.0005458259,0.9739605,0.00010144443,0.017727887,0.0016582428,0.00007154401],"about_ca_topic_score_codex":0.79677814,"about_ca_topic_score_gemma":0.7806498,"teacher_disagreement_score":0.20322186,"about_ca_system_score_codex":0.0155329555,"about_ca_system_score_gemma":0.00496051,"threshold_uncertainty_score":0.40883732},"labels":[],"label_agreement":null},{"id":"W1500452035","doi":"10.1109/pess.2002.1043668","title":"Transmission congestion relief by economic load management","year":2003,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Congestion management; Network congestion; Computer science; Transmission (telecommunications); Load management; Computer network; Electricity; Telecommunications; Electric power system; Engineering; Power (physics); Electrical engineering","score_opus":0.0024954385171963613,"score_gpt":0.16693798482172376,"score_spread":0.1644425463045274,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1500452035","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1544292,0.0005678561,0.8052623,0.0011769618,0.00014987955,0.0001505022,0.00006437902,0.0010645454,0.037134226],"genre_scores_gemma":[0.9668641,0.00023404947,0.027267665,0.00007250777,0.000108394896,0.000045678604,0.00003953972,0.00007202013,0.005295994],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99964154,0.00012662419,0.0000125982115,0.000031810177,0.00014015938,0.000047229038],"domain_scores_gemma":[0.9997222,0.000071938906,0.000070205526,0.0000482969,0.00006555136,0.000021870688],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047000026,0.0005269746,0.00039261082,0.0005844103,0.0003581422,0.000868055,0.0008866223,0.0002922049,0.0030062946],"category_scores_gemma":[0.0011070806,0.00016882074,0.00024464697,0.0005002722,0.00046332247,0.0011932254,0.00082573853,0.0004968546,0.00035911935],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002792774,0.00036798668,0.0019899462,0.000108004955,0.000066780856,0.00028756092,0.00015397825,0.68335205,0.016715616,0.067786604,0.0048423694,0.22404979],"study_design_scores_gemma":[0.00008570705,0.00015780694,0.0013739604,0.000014908418,0.000034073284,0.000108308326,0.00007859598,0.9652235,0.004778245,0.018506004,0.009614447,0.000024315457],"about_ca_topic_score_codex":0.0009057485,"about_ca_topic_score_gemma":0.0014572983,"teacher_disagreement_score":0.0030062946,"about_ca_system_score_codex":0.0004387874,"about_ca_system_score_gemma":0.00041275722,"threshold_uncertainty_score":0.010057092},"labels":[],"label_agreement":null},{"id":"W1505385814","doi":"10.1109/34084poweri.2014.7117633","title":"Optimization of co-generation system operation","year":2014,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Cogeneration; Integer programming; Linear programming; Mathematical optimization; Computer science; Selection (genetic algorithm); Optimization problem; Electricity generation; Mathematics; Power (physics)","score_opus":0.00669610139861456,"score_gpt":0.18856246924598355,"score_spread":0.18186636784736898,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1505385814","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23880717,0.0014660144,0.71006393,0.00046036867,0.00015639255,0.00015805008,0.00057313975,0.00042998663,0.04788491],"genre_scores_gemma":[0.98147947,0.00025214828,0.012987592,0.000030558178,0.000014228774,0.000054581305,0.00010873272,0.000058750284,0.0050138407],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996618,0.00013752311,0.000008804001,0.00007002917,0.00006573532,0.000056007684],"domain_scores_gemma":[0.99963963,0.00022307939,0.00004191901,0.000021594733,0.00005443686,0.000019337835],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049437134,0.0011215995,0.00078267243,0.00041594516,0.00034308867,0.001581241,0.00047207306,0.00079131394,0.004221653],"category_scores_gemma":[0.001397591,0.00028015167,0.000330165,0.00095154654,0.00038619115,0.0012439785,0.000485753,0.0007057828,0.00047235817],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055420394,0.00002636535,0.00029332098,0.000036924488,0.000017279477,0.000041492603,0.000008897334,0.9860779,0.0013072467,0.002129149,0.00027462663,0.009731306],"study_design_scores_gemma":[0.000009115133,0.0000722823,0.0005251438,0.000005015769,0.000011866614,0.00002645128,0.000016999924,0.995619,0.001235942,0.0017084928,0.0007639012,0.000005759318],"about_ca_topic_score_codex":0.0033661232,"about_ca_topic_score_gemma":0.004277053,"teacher_disagreement_score":0.004221653,"about_ca_system_score_codex":0.00069799053,"about_ca_system_score_gemma":0.0008536031,"threshold_uncertainty_score":0.014122844},"labels":[],"label_agreement":null},{"id":"W1508489305","doi":"10.5772/32649","title":"Hydropower Scheduling in Large Scale Power Systems","year":2012,"lang":"en","type":"book-chapter","venue":"InTech eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Computer science; Scheduling (production processes); Scale (ratio); Environmental science; Electrical engineering; Engineering; Geography; Operations management; Cartography","score_opus":0.008252188108419925,"score_gpt":0.2055462183905543,"score_spread":0.19729403028213438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1508489305","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057300266,0.04056038,0.76508987,0.0024633994,0.0013955255,0.00020124373,0.0006939258,0.0014067397,0.13088873],"genre_scores_gemma":[0.7865075,0.021807365,0.12548749,0.0003125522,0.0009759984,0.00024122662,0.00074853597,0.00055090006,0.06336844],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99980265,0.00007905996,0.000008054485,0.00003752543,0.00004950873,0.000023269115],"domain_scores_gemma":[0.99973065,0.0001674706,0.000022040262,0.000022982684,0.000031132895,0.000025687004],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042763696,0.00074277463,0.00070143,0.00019802382,0.00033676333,0.0011747008,0.00060439104,0.00043019897,0.005352783],"category_scores_gemma":[0.00088863436,0.00035470305,0.00029435763,0.00097049685,0.00035485832,0.0010310846,0.0004957755,0.0007464009,0.00092914276],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008128501,0.000062058854,0.0003027807,0.00032808882,0.00004365607,0.00017304241,0.00007723932,0.7868556,0.0015905091,0.0501038,0.024759376,0.13562265],"study_design_scores_gemma":[0.000039904233,0.00007120622,0.00061607955,0.00006859999,0.000016590624,0.00011143918,0.000092104114,0.82256204,0.0006321575,0.1363614,0.039413664,0.000014863927],"about_ca_topic_score_codex":0.002817039,"about_ca_topic_score_gemma":0.0034035665,"teacher_disagreement_score":0.005352783,"about_ca_system_score_codex":0.00083838555,"about_ca_system_score_gemma":0.00065346016,"threshold_uncertainty_score":0.017906904},"labels":[],"label_agreement":null},{"id":"W1508563488","doi":"","title":"Price and Environment in Electricity Restructuring","year":2001,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Restructuring; Electricity; Electricity market; Volatility (finance); Electricity price; Margin (machine learning); Economics; Welfare; Electricity retailing; Spot contract; Harm; Business; Microeconomics; Industrial organization; Monetary economics; Natural resource economics; Market economy; Financial economics; Finance","score_opus":0.012333615832813232,"score_gpt":0.23902266498571592,"score_spread":0.2266890491529027,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1508563488","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41928774,0.011665316,0.022620806,0.040877204,0.00064975454,0.000056791894,0.00010755031,0.000056285433,0.50467855],"genre_scores_gemma":[0.9887953,0.0018239085,0.00070372,0.0005218329,0.00018422157,0.000009604056,0.000011474615,0.000016003043,0.00793399],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99953544,0.00019673936,0.000011078094,0.000046757465,0.00010929673,0.00010069722],"domain_scores_gemma":[0.9992023,0.00041717125,0.00016121083,0.000037244776,0.000100751924,0.00008136939],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055506395,0.00016087483,0.00027712746,0.00027144456,0.0006961162,0.0027213152,0.00031135438,0.0016049271,0.0054251626],"category_scores_gemma":[0.0031570797,0.00011029499,0.00027445648,0.00051685376,0.002430597,0.002821169,0.0009079095,0.0012257805,0.00020558712],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007439467,0.00010517797,0.005541597,0.00004863039,0.000017402917,0.00043133248,0.0003470059,0.02053475,0.000533474,0.94028986,0.004726072,0.027350327],"study_design_scores_gemma":[0.00003741571,0.00010843726,0.0117269335,0.000041527263,0.000014757576,0.0001791098,0.0011241243,0.013036383,0.0003296158,0.948552,0.024822759,0.000026943177],"about_ca_topic_score_codex":0.0021744394,"about_ca_topic_score_gemma":0.0025518553,"teacher_disagreement_score":0.0054251626,"about_ca_system_score_codex":0.0013420698,"about_ca_system_score_gemma":0.00075070164,"threshold_uncertainty_score":0.018148959},"labels":[],"label_agreement":null},{"id":"W1510196018","doi":"10.1108/17506220911005768","title":"The value of unused interregional transmission","year":2009,"lang":"en","type":"article","venue":"International Journal of Energy Sector Management","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"HEC Montréal","funders":"","keywords":"Electricity; Electric power transmission; Transaction cost; Opportunity cost; Economics; Value (mathematics); Electricity market; Business; Transmission (telecommunications); Originality; Telecommunications; Engineering; Finance; Microeconomics; Computer science","score_opus":0.004458054043563458,"score_gpt":0.20152109981265034,"score_spread":0.1970630457690869,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1510196018","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9286066,0.0033385865,0.006924986,0.0006476955,0.000044151373,0.00004473154,0.0037403055,0.0000811386,0.05657186],"genre_scores_gemma":[0.9972343,0.00029236695,0.00064242166,0.000020957614,0.000008120064,0.000004091733,0.0003360431,0.000017885355,0.0014437701],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99771154,0.0006126767,0.00010747813,0.0001993398,0.0010657072,0.00030325097],"domain_scores_gemma":[0.9902546,0.0027348918,0.0022304885,0.00074921217,0.0035466722,0.0004841761],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011682432,0.00027411574,0.00026288017,0.0023725484,0.00074210676,0.0038156374,0.0012083972,0.00028249505,0.0043312944],"category_scores_gemma":[0.006889015,0.0002001178,0.00035954377,0.0050560962,0.0012202587,0.0016283628,0.0008556442,0.00051135,0.00027449836],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032450692,0.00004682783,0.72293794,0.0005887541,0.00070664193,0.0023703573,0.0026496714,0.083106086,0.004034283,0.016710324,0.0033386522,0.16318597],"study_design_scores_gemma":[0.000011530898,0.00011529782,0.9119992,0.0005515725,0.00020382594,0.0018167224,0.0066723563,0.030705068,0.0016787904,0.003914953,0.042217784,0.0001129143],"about_ca_topic_score_codex":0.2481926,"about_ca_topic_score_gemma":0.4591512,"teacher_disagreement_score":0.2481926,"about_ca_system_score_codex":0.007868219,"about_ca_system_score_gemma":0.0021587352,"threshold_uncertainty_score":0.49349594},"labels":[],"label_agreement":null},{"id":"W1512647074","doi":"","title":"Explaining time-varying risk of electricity forwards: trading activity and news announcements","year":2010,"lang":"en","type":"preprint","venue":"Econstor (Econstor)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Jump; Volatility (finance); Econometrics; Electricity; Order (exchange); Maturity (psychological); Electricity price; Economics; Quarter (Canadian coin); Financial economics; Engineering; Finance","score_opus":0.009623571617718851,"score_gpt":0.21626299906100113,"score_spread":0.2066394274432823,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1512647074","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98423994,0.0013087277,0.0031613181,0.0017013146,0.000053602897,0.000020804337,0.0062950384,0.00010502066,0.00311414],"genre_scores_gemma":[0.9920157,0.0006025837,0.00067223003,0.000045633908,0.00012776296,0.0000148641275,0.005396155,0.00001728919,0.0011078053],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996387,0.000089495814,0.000040640964,0.000069402384,0.000088777175,0.00007298767],"domain_scores_gemma":[0.9908036,0.005426626,0.0029886223,0.00031626527,0.00023325076,0.0002315729],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011746499,0.00038470866,0.0004360712,0.0019755655,0.00020927901,0.0018875602,0.0003759778,0.0010471815,0.003830225],"category_scores_gemma":[0.008009084,0.00020830175,0.0005064925,0.0023842244,0.00032061143,0.0010485312,0.0004992133,0.0009317846,0.0006513899],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000537612,0.00034414284,0.8823491,0.00022192787,0.0003097556,0.0014965003,0.00047822355,0.052228488,0.0025363043,0.012505457,0.01412532,0.03286726],"study_design_scores_gemma":[0.00009140387,0.000111371985,0.77091,0.00009126015,0.0001819651,0.00034931785,0.0006042548,0.20880073,0.0011905468,0.0101886,0.0074184323,0.00006212212],"about_ca_topic_score_codex":0.008299357,"about_ca_topic_score_gemma":0.006969724,"teacher_disagreement_score":0.008299357,"about_ca_system_score_codex":0.00052917196,"about_ca_system_score_gemma":0.00029739228,"threshold_uncertainty_score":0.016502082},"labels":[],"label_agreement":null},{"id":"W151902564","doi":"10.1007/978-1-4419-6123-5_11","title":"Electricity and Environmental Markets","year":2012,"lang":"en","type":"book-chapter","venue":"International series in management science/operations research/International series in operations research & management science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Complementarity (molecular biology); Electricity market; Industrial organization; Environmental economics; Business; Electricity retailing; Electricity system; Electricity generation; Commerce; Economics; Power (physics); Engineering; Electrical engineering","score_opus":0.025223017989756145,"score_gpt":0.3221470764764837,"score_spread":0.2969240584867276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W151902564","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0021329306,0.025952224,0.0025696228,0.009931881,0.0011184544,0.000012223238,0.0001383521,0.000038124595,0.9581061],"genre_scores_gemma":[0.0733536,0.021812659,0.0009765824,0.0023766037,0.0020097937,0.000034406854,0.00016827893,0.00006778301,0.8992004],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998815,0.0000248944,0.000002903571,0.000023198094,0.00005161148,0.000015937841],"domain_scores_gemma":[0.99991715,0.000025902242,0.0000070706033,0.000015391743,0.000022702554,0.000011869909],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022964198,0.000579956,0.00033128526,0.0006699163,0.00061477127,0.0022606892,0.0004106563,0.0012123159,0.05414618],"category_scores_gemma":[0.0006819304,0.00017370026,0.00021805195,0.0010262242,0.001053233,0.0033833892,0.0007290944,0.0013771495,0.0064881006],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008331022,0.000027027058,0.00012793997,0.000041574945,0.00000560761,0.000047630103,0.00010145084,0.00060958567,0.00013720119,0.7592038,0.17992875,0.05976104],"study_design_scores_gemma":[0.000005251502,0.000007905927,0.00039431348,0.000072551054,0.0000034857262,0.000070710266,0.00011123088,0.00047690966,0.000095524025,0.4367836,0.56197476,0.000003754597],"about_ca_topic_score_codex":0.0023027533,"about_ca_topic_score_gemma":0.0067405985,"teacher_disagreement_score":0.05414618,"about_ca_system_score_codex":0.0011088041,"about_ca_system_score_gemma":0.00072310783,"threshold_uncertainty_score":0.18113703},"labels":[],"label_agreement":null},{"id":"W1531629538","doi":"10.15173/esr.v13i1.467","title":"Markets for Financial Transmission Rights","year":2004,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Transmission (telecommunications); Business; Finance; Financial market; Hedge; Computer science; Telecommunications","score_opus":0.011857349838113047,"score_gpt":0.24475226322735916,"score_spread":0.23289491338924612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1531629538","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10145021,0.034559656,0.11222427,0.010335979,0.00041196082,0.0001974169,0.00067884754,0.00017965244,0.73996204],"genre_scores_gemma":[0.8822881,0.024193695,0.017261531,0.0008453707,0.00071164814,0.0002397573,0.00041130866,0.000056524663,0.07399212],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.999458,0.00012556721,0.000021992182,0.000078381636,0.00022959802,0.00008639627],"domain_scores_gemma":[0.99918145,0.00041716336,0.0001903574,0.000054443208,0.00011396033,0.00004260787],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010037734,0.0004853041,0.00053049333,0.0008545064,0.0007925512,0.0031595835,0.00051874586,0.001484535,0.023824273],"category_scores_gemma":[0.00265867,0.00021608308,0.000573524,0.000804652,0.0012123194,0.0060354983,0.00070214097,0.0011275746,0.0012418198],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029584124,0.000035520858,0.00038361395,0.000113359725,0.000012621198,0.00012281189,0.000054507116,0.0064350427,0.0007551584,0.9518704,0.0040104976,0.03617687],"study_design_scores_gemma":[0.00007641136,0.00017388251,0.0015671245,0.00030323275,0.000024525352,0.00069152395,0.00024251647,0.016065469,0.001574106,0.71005666,0.2691758,0.00004877765],"about_ca_topic_score_codex":0.0010208772,"about_ca_topic_score_gemma":0.0009363189,"teacher_disagreement_score":0.023824273,"about_ca_system_score_codex":0.0011546105,"about_ca_system_score_gemma":0.0006336219,"threshold_uncertainty_score":0.07970011},"labels":[],"label_agreement":null},{"id":"W1534852015","doi":"10.1109/pes.2004.1373066","title":"Allocation of transmission capacity in the central America electricity market","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Electricity market; Electricity; Transmission (telecommunications); Common value auction; Electric power transmission; Business; Point (geometry); Industrial organization; Environmental economics; Computer science; Economics; Telecommunications; Microeconomics; Engineering; Electrical engineering","score_opus":0.006406651754228939,"score_gpt":0.1832829415247242,"score_spread":0.17687628977049527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1534852015","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72493964,0.00092522736,0.14102714,0.0020409361,0.000085036736,0.00023854055,0.00019022771,0.00027755063,0.13027567],"genre_scores_gemma":[0.9837307,0.00018155332,0.010567625,0.00007440289,0.000015922607,0.00005903134,0.000024874924,0.000022063366,0.0053238524],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990694,0.00047478147,0.000021658952,0.000106199856,0.00014633247,0.00018158183],"domain_scores_gemma":[0.9991949,0.00038616458,0.00009941761,0.0000647871,0.0001330253,0.000121615834],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014681371,0.0004149343,0.00064560893,0.00072307687,0.0008952002,0.0034227252,0.001169688,0.0010058273,0.005150758],"category_scores_gemma":[0.0034133564,0.00063202094,0.0003819706,0.0011612439,0.001810629,0.0023943037,0.0014151332,0.0010028878,0.00020761647],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032727988,0.00016473813,0.0014707068,0.000093002425,0.00007367594,0.00042846033,0.00037574908,0.5093961,0.00363799,0.4494516,0.0046673086,0.029913442],"study_design_scores_gemma":[0.00027137456,0.00019601932,0.001968896,0.000039677336,0.000051216444,0.00023987466,0.00073205837,0.84597385,0.0013681536,0.1416202,0.0074804015,0.000058203776],"about_ca_topic_score_codex":0.010822848,"about_ca_topic_score_gemma":0.02323588,"teacher_disagreement_score":0.010822848,"about_ca_system_score_codex":0.0028024057,"about_ca_system_score_gemma":0.002060352,"threshold_uncertainty_score":0.02151972},"labels":[],"label_agreement":null},{"id":"W1536699196","doi":"10.1109/eem.2015.7216641","title":"The evolution of bidding strategies in Spain following the introduction of renewable energy","year":2015,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bidding; Revenue; Quarter (Canadian coin); Renewable energy; Electricity; Agricultural economics; Production (economics); Economics; Order (exchange); Natural resource economics; Business; Microeconomics; Engineering; Finance; Geography","score_opus":0.006662416003210731,"score_gpt":0.19347596928703367,"score_spread":0.18681355328382293,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1536699196","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9941969,0.00016096319,0.00039610296,0.00016606924,0.000008060326,0.000006007535,0.0001405665,0.000019326464,0.0049060797],"genre_scores_gemma":[0.9984732,0.000042206946,0.00013393884,0.0000229046,0.0000026995845,0.0000025392096,0.00013626595,0.000006793048,0.0011794235],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99955136,0.00018502653,0.000018039074,0.00004982368,0.00007539714,0.0001203924],"domain_scores_gemma":[0.99814427,0.0006499335,0.00045809482,0.00009014093,0.0004155544,0.00024202417],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013839877,0.00012250835,0.00025259895,0.00034820253,0.00017065767,0.0013797014,0.0004810753,0.0006518088,0.001219032],"category_scores_gemma":[0.0038350148,0.00012041631,0.0002083985,0.00044550223,0.00023920879,0.000334824,0.00038349628,0.00031426531,0.00042221075],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0035850105,0.00094108976,0.7176983,0.00017875801,0.00021741212,0.0027227763,0.00305358,0.14245094,0.00903434,0.010525211,0.0100793615,0.09951322],"study_design_scores_gemma":[0.00017112482,0.00045679303,0.858989,0.000040925173,0.00004426577,0.00050918286,0.006411895,0.115461215,0.0017219029,0.0035333408,0.012576775,0.00008366644],"about_ca_topic_score_codex":0.015947437,"about_ca_topic_score_gemma":0.01803523,"teacher_disagreement_score":0.015947437,"about_ca_system_score_codex":0.001218039,"about_ca_system_score_gemma":0.00047095233,"threshold_uncertainty_score":0.031709194},"labels":[],"label_agreement":null},{"id":"W1536700515","doi":"10.1109/pes.2005.1489582","title":"An overview of the operation of Ontario's electricity market","year":2005,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2005","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity market; Electricity; Business; Energy market; Industrial organization; Environmental economics; Economics; Engineering; Electrical engineering","score_opus":0.008817326617782364,"score_gpt":0.21843344019962613,"score_spread":0.20961611358184376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1536700515","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05749219,0.029072661,0.010514182,0.0053530303,0.0002235826,0.0003311444,0.00690417,0.00034810897,0.8897609],"genre_scores_gemma":[0.6195812,0.06637852,0.013677089,0.0006375328,0.00042475684,0.00015781503,0.004621563,0.00019619093,0.29432535],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99909675,0.000051019466,0.000029205481,0.00005113242,0.00055729965,0.0002146249],"domain_scores_gemma":[0.9996146,0.000033487453,0.000047937512,0.000019082869,0.00022102353,0.00006385231],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041709805,0.00042064258,0.00020043385,0.0022397842,0.0021473465,0.004100669,0.00067024253,0.0005625635,0.011669278],"category_scores_gemma":[0.0007625703,0.0003122432,0.00023610407,0.005233933,0.00097538426,0.0015001913,0.00053147523,0.00031248023,0.0011330681],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023921036,0.00009450258,0.033297125,0.0009591703,0.00005875106,0.0014661246,0.0026627237,0.019766709,0.004028916,0.43816343,0.20728871,0.2919746],"study_design_scores_gemma":[0.00001599499,0.000035228448,0.04061358,0.0001741981,0.000017498356,0.00025567954,0.0008848352,0.007397328,0.00042362988,0.012182903,0.93794125,0.000057896625],"about_ca_topic_score_codex":0.9384992,"about_ca_topic_score_gemma":0.96204555,"teacher_disagreement_score":0.061500788,"about_ca_system_score_codex":0.038551316,"about_ca_system_score_gemma":0.022538234,"threshold_uncertainty_score":0.2797107},"labels":[],"label_agreement":null},{"id":"W1544055581","doi":"10.1111/aspp.12118","title":"South Korea's National Energy Plan Six Years On","year":2014,"lang":"en","type":"article","venue":"Asian Politics & Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Korea Energy Economics Institute; Georgia State University","keywords":"Renewable energy; Plan (archaeology); Quarter (Canadian coin); Nuclear power; Fossil fuel; Government (linguistics); Energy (signal processing); Energy policy; Alternative energy; Natural resource economics; Environmental protection; Business; Economic growth; Environmental science; Geography; Economics; Engineering; Waste management; Physics","score_opus":0.005975991571961703,"score_gpt":0.20715508450300363,"score_spread":0.20117909293104191,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1544055581","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.047342952,0.010645602,0.0031921717,0.042803917,0.005648695,0.0006013277,0.009882815,0.00035323505,0.87952924],"genre_scores_gemma":[0.27427873,0.008635398,0.0049613733,0.029008873,0.00018901976,0.00062000484,0.0062573175,0.00015902493,0.67589027],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99952376,0.00005891146,0.000026118529,0.000049452265,0.00017579498,0.00016600468],"domain_scores_gemma":[0.9998325,0.000007936097,0.000013230545,0.000015022485,0.00009096816,0.000040313287],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068104616,0.0006733153,0.00018130327,0.0004905475,0.00094832847,0.002551308,0.00047563802,0.0011764236,0.012662886],"category_scores_gemma":[0.0007025948,0.0002641313,0.00038913116,0.00058615947,0.00038730624,0.0010237683,0.0016334926,0.0018881253,0.0029054086],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002754919,0.0001420435,0.0034279039,0.00077351363,0.00007132329,0.0010192381,0.0005925387,0.003525478,0.0037805748,0.32825083,0.5288145,0.12932654],"study_design_scores_gemma":[0.000018394516,0.000039360108,0.0035943794,0.00010098218,0.000010866654,0.00008713165,0.00019600133,0.00017250948,0.0004509009,0.0025638556,0.9927516,0.000014062039],"about_ca_topic_score_codex":0.033722855,"about_ca_topic_score_gemma":0.059180744,"teacher_disagreement_score":0.033722855,"about_ca_system_score_codex":0.0031977666,"about_ca_system_score_gemma":0.010769973,"threshold_uncertainty_score":0.06705314},"labels":[],"label_agreement":null},{"id":"W1545140710","doi":"10.7202/602357ar","title":"Électricité en Afrique et performance productive","year":2009,"lang":"fr","type":"article","venue":"L Actualité économique","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Political science; Welfare economics; Economy; Humanities; Economics; Art","score_opus":0.011393846900244043,"score_gpt":0.21751302452272225,"score_spread":0.20611917762247822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1545140710","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75094384,0.003380491,0.010053491,0.001500005,0.000046131943,0.00007082587,0.0024438258,0.000105510204,0.23145595],"genre_scores_gemma":[0.9693581,0.0011269613,0.0013903889,0.000051404302,0.000034447752,0.00003464021,0.0006818925,0.00002142425,0.02730077],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99880147,0.0003093745,0.000063275205,0.00024118986,0.0003894954,0.00019531946],"domain_scores_gemma":[0.9949221,0.002294904,0.0012973611,0.0004890638,0.0007406038,0.00025597523],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016166491,0.00025459295,0.00030041352,0.00119304,0.00049109885,0.0031113708,0.00038326418,0.00045504255,0.016087085],"category_scores_gemma":[0.0058338707,0.000115048395,0.00033498777,0.0035116286,0.0009607926,0.0019232642,0.001009535,0.0005078742,0.002028609],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047402817,0.00038657108,0.5719696,0.000695622,0.00026294368,0.0003236055,0.005631127,0.03510225,0.0065783523,0.11224843,0.0061567836,0.26017076],"study_design_scores_gemma":[0.0000323544,0.0003898964,0.8756894,0.00020803776,0.0000681544,0.0002906788,0.004119478,0.004735747,0.0034021772,0.019001182,0.09201341,0.000049553033],"about_ca_topic_score_codex":0.011053708,"about_ca_topic_score_gemma":0.010294046,"teacher_disagreement_score":0.016087085,"about_ca_system_score_codex":0.0017624167,"about_ca_system_score_gemma":0.0009518126,"threshold_uncertainty_score":0.053816676},"labels":[],"label_agreement":null},{"id":"W1549726720","doi":"10.1002/etep.153","title":"Assessing mid‐continent area power pool capacity adequacy including transmission limitations","year":2007,"lang":"en","type":"article","venue":"European Transactions on Electrical Power","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Manitoba Hydro","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Electric power system; Environmental science; Transmission (telecommunications); Margin (machine learning); Transmission system; Computer science; Power (physics); Engineering; Telecommunications","score_opus":0.04045538329922824,"score_gpt":0.24903932051741332,"score_spread":0.20858393721818508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1549726720","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9956494,0.00009794805,0.0021217375,0.000051681538,0.000002544796,0.000014074667,0.00021216727,0.000032751468,0.001817755],"genre_scores_gemma":[0.9991825,0.000021338108,0.0005835787,0.0000049456294,0.0000019663614,0.000007020836,0.00009087565,0.0000027012288,0.00010508345],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992899,0.00045095477,0.000023305092,0.00004865432,0.00012114907,0.000065995366],"domain_scores_gemma":[0.9981773,0.0009417173,0.00026815437,0.00014707781,0.00037336076,0.00009233813],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017674085,0.0003346944,0.00046213443,0.0007981779,0.00029765294,0.00057244586,0.00038638612,0.000272442,0.001157203],"category_scores_gemma":[0.0041969735,0.000116005365,0.0004720265,0.0006466022,0.00026895295,0.00063148414,0.00061740034,0.00022629129,0.00013016754],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00058250024,0.00008285929,0.28522524,0.00009605267,0.0002398728,0.0010129338,0.00030094653,0.67363626,0.0037524388,0.0013359281,0.0006374949,0.033097405],"study_design_scores_gemma":[0.00007827192,0.00065211277,0.4110783,0.000051252104,0.00014136254,0.00049368525,0.00082632573,0.57283276,0.0087979585,0.0015419464,0.003454292,0.000051638857],"about_ca_topic_score_codex":0.01705916,"about_ca_topic_score_gemma":0.012373158,"teacher_disagreement_score":0.01705916,"about_ca_system_score_codex":0.0006051617,"about_ca_system_score_gemma":0.0006634254,"threshold_uncertainty_score":0.033919692},"labels":[],"label_agreement":null},{"id":"W1551178689","doi":"10.1109/naps.2005.1560584","title":"Generation expansion under risk using stochastic programming","year":2005,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Randomness; Stochastic programming; Computer science; Mathematical optimization; Stochastic modelling; Stochastic process; Stochastic optimization; Value (mathematics); Work (physics); Expected value; Mathematics; Engineering; Statistics","score_opus":0.023691392891997096,"score_gpt":0.23718446932323,"score_spread":0.21349307643123291,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1551178689","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019416744,0.0006702163,0.9745079,0.0005959413,0.00003241333,0.00003080212,0.000045519715,0.0000726537,0.004627753],"genre_scores_gemma":[0.9096339,0.0016918911,0.082050525,0.00012547582,0.0001404484,0.00018296242,0.00009520014,0.00007415489,0.006005412],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99843675,0.0009275856,0.000037682094,0.00016694756,0.00031251367,0.000118425334],"domain_scores_gemma":[0.99792933,0.0016118252,0.00022087575,0.00005916122,0.00011723476,0.00006157158],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021779456,0.0009964221,0.0011694517,0.00058986037,0.000396783,0.0017061585,0.0007174074,0.0008833282,0.0014504741],"category_scores_gemma":[0.0040507545,0.00059089117,0.0010182759,0.00086362305,0.001090649,0.0018403699,0.0011795735,0.001370388,0.0001332527],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013111757,0.000010174906,0.000106382686,0.000026350303,0.000021320408,0.0000352016,0.000018343515,0.92954093,0.00017093071,0.06537186,0.00022831977,0.004457098],"study_design_scores_gemma":[0.0000051217107,0.000017384751,0.000033948152,0.0000074419745,0.0000053438785,0.000012417214,0.000008216205,0.9465445,0.0000762133,0.052929364,0.00035422167,0.0000057621032],"about_ca_topic_score_codex":0.0025462504,"about_ca_topic_score_gemma":0.0023021672,"teacher_disagreement_score":0.0025462504,"about_ca_system_score_codex":0.0013522988,"about_ca_system_score_gemma":0.0014521118,"threshold_uncertainty_score":0.01151818},"labels":[],"label_agreement":null},{"id":"W1552630275","doi":"10.1023/a:1023307319633","title":"An Oligopolistic Investment Model of the Finnish Electricity Market","year":2003,"lang":"en","type":"article","venue":"Annals of Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":74,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Oligopoly; Economics; Microeconomics; Investment (military); Electricity market; Mixed complementarity problem; Production (economics); Stochastic programming; Market power; Complementarity (molecular biology); Industrial organization; Electricity; Mathematical optimization; Cournot competition; Mathematics; Engineering","score_opus":0.12556702748705448,"score_gpt":0.37780454528509755,"score_spread":0.25223751779804304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1552630275","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6122282,0.005345905,0.16236682,0.008296566,0.0004431034,0.00016175966,0.0028987064,0.00024465082,0.20801437],"genre_scores_gemma":[0.97584367,0.00089943636,0.003068706,0.00008955817,0.00006753066,0.000058797737,0.00021059491,0.000023978744,0.019737685],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995314,0.0002264514,0.000017836719,0.000064438274,0.00004493937,0.00011494838],"domain_scores_gemma":[0.999228,0.0004444122,0.00009933199,0.00002617208,0.00007518315,0.00012691847],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008153349,0.00081518263,0.0012696824,0.0006674436,0.00084828166,0.003006905,0.0019343531,0.0032023538,0.008900196],"category_scores_gemma":[0.0025208592,0.00085797015,0.00094247365,0.0010493837,0.001399639,0.0025709842,0.0008893281,0.0015102589,0.00055505655],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000093679475,0.000048716192,0.0005129943,0.000054464777,0.00003340952,0.00027617137,0.00006643421,0.85810333,0.00026087777,0.13748464,0.0012771757,0.0017881148],"study_design_scores_gemma":[0.00006094927,0.000043925196,0.000406849,0.000018722945,0.00003754367,0.00005682484,0.000057466386,0.94917905,0.000063300016,0.048829883,0.0012198512,0.000025643829],"about_ca_topic_score_codex":0.028655345,"about_ca_topic_score_gemma":0.018909177,"teacher_disagreement_score":0.028655345,"about_ca_system_score_codex":0.0027110723,"about_ca_system_score_gemma":0.0024514787,"threshold_uncertainty_score":0.056977093},"labels":[],"label_agreement":null},{"id":"W1571928647","doi":"10.1109/melcon.2006.1653251","title":"Financial Transmission Rights in Electricity Markets (Invited Paper)","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Bidding; Computer science; Electricity market; Electricity; Transmission (telecommunications); Finance; Business; Telecommunications; Electrical engineering","score_opus":0.0018377560369239702,"score_gpt":0.1569943969041148,"score_spread":0.15515664086719083,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1571928647","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.060795244,0.15349756,0.07416885,0.18404749,0.044655476,0.00006566703,0.00047384333,0.00016906195,0.48212674],"genre_scores_gemma":[0.67737824,0.07520987,0.010327631,0.007898215,0.034990545,0.00006245033,0.00022619875,0.00014119738,0.19376564],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9998234,0.00006907545,0.0000068308764,0.000026028622,0.00004276625,0.000031953132],"domain_scores_gemma":[0.99945563,0.00034764048,0.0000318527,0.000020842948,0.0001028263,0.000041198415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048844225,0.00030615638,0.00022910879,0.00041435938,0.0004520307,0.0015403552,0.0002769077,0.0015937666,0.014825603],"category_scores_gemma":[0.0018960014,0.0001486972,0.00027359408,0.0006818687,0.0009028749,0.0031884415,0.00045955053,0.001484468,0.0014866719],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005601549,0.00003321854,0.00030769614,0.00018111672,0.000013875839,0.00033980055,0.00014712711,0.0042849868,0.0005634787,0.791076,0.14566183,0.057334892],"study_design_scores_gemma":[0.00003946125,0.000056776906,0.00089645793,0.00022663725,0.000016770613,0.00046076768,0.00017684326,0.008061454,0.0008842846,0.6261092,0.3630447,0.000026769863],"about_ca_topic_score_codex":0.0010185422,"about_ca_topic_score_gemma":0.0010974,"teacher_disagreement_score":0.014825603,"about_ca_system_score_codex":0.00065309316,"about_ca_system_score_gemma":0.00039114288,"threshold_uncertainty_score":0.049596608},"labels":[],"label_agreement":null},{"id":"W1574292650","doi":"","title":"Electricity Trade Patterns in a Network: Evidence from the Ontario Market","year":2011,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity market; Economics; Production (economics); Electricity price; International economics; Business; Industrial organization; Microeconomics","score_opus":0.0358368965058377,"score_gpt":0.2570452092713632,"score_spread":0.2212083127655255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1574292650","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9904523,0.00021247247,0.00017287502,0.00017738336,0.0000024450765,0.000011072092,0.0012292004,0.0000057405327,0.007736509],"genre_scores_gemma":[0.99754447,0.00022815773,0.00007435763,0.000015567695,0.000004582559,0.000003156026,0.0009953709,0.000004156981,0.0011300192],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99966013,0.0000482371,0.000019297075,0.000056860506,0.00012723735,0.00008824332],"domain_scores_gemma":[0.9958126,0.00091634045,0.0018411773,0.00027161278,0.0008605842,0.00029774383],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034433906,0.000127639,0.00025133198,0.001016578,0.0011055113,0.0012387047,0.00034521436,0.00027726515,0.0034083494],"category_scores_gemma":[0.0036713574,0.00015341898,0.00025356558,0.0034348574,0.0008180357,0.00082773087,0.0005307685,0.0002470738,0.0002898169],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047324825,0.0001010399,0.96913534,0.00010587537,0.00019190816,0.00080660393,0.0023437757,0.004494424,0.0010229857,0.0057680826,0.005158264,0.010398408],"study_design_scores_gemma":[0.00005450958,0.00003577063,0.9815508,0.000026956704,0.000085902124,0.0001639134,0.0024495544,0.007903712,0.0003743223,0.0010395026,0.0062927045,0.000022342863],"about_ca_topic_score_codex":0.8350521,"about_ca_topic_score_gemma":0.91469634,"teacher_disagreement_score":0.16494793,"about_ca_system_score_codex":0.0053776233,"about_ca_system_score_gemma":0.0018716806,"threshold_uncertainty_score":0.33183867},"labels":[],"label_agreement":null},{"id":"W1576454826","doi":"10.1109/pes.2005.1489552","title":"Complementarity-based models for financial transmission rights","year":2005,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2005","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Consejo Nacional de Ciencia y Tecnología","keywords":"Complementarity (molecular biology); Computer science; Mathematical optimization; Financial market; Microeconomics; Economics; Econometrics; Finance; Mathematics","score_opus":0.007900170734737802,"score_gpt":0.20831189783758042,"score_spread":0.2004117271028426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1576454826","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048068125,0.0011491296,0.8510182,0.0027009146,0.00014868,0.000107189604,0.0004942324,0.00015045957,0.096163034],"genre_scores_gemma":[0.92631584,0.001129641,0.02839036,0.00036521445,0.00012333556,0.00028667488,0.00028689968,0.00006003115,0.043041997],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992562,0.00031252953,0.0000184212,0.00007638805,0.00018501212,0.00015137505],"domain_scores_gemma":[0.99892384,0.00066532986,0.00013742642,0.00006166434,0.00012993936,0.000081746286],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012183553,0.000772189,0.00079133274,0.00084470754,0.0008491161,0.001928495,0.001543969,0.0019742798,0.0138798775],"category_scores_gemma":[0.0028165637,0.00047922143,0.001092866,0.0009551252,0.0021303238,0.0028063287,0.0013215861,0.0017309149,0.00074748526],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012971603,0.000013848211,0.000087330525,0.00001896425,0.000008229274,0.000056107565,0.000048075814,0.348479,0.00018071129,0.64901465,0.0008256686,0.0012543695],"study_design_scores_gemma":[0.000016546308,0.000012666765,0.000061144936,0.000008860664,0.0000047470794,0.000023244902,0.000028119386,0.74326974,0.000059528003,0.2544745,0.0020301682,0.000010763921],"about_ca_topic_score_codex":0.010789808,"about_ca_topic_score_gemma":0.0072132465,"teacher_disagreement_score":0.0138798775,"about_ca_system_score_codex":0.0024780321,"about_ca_system_score_gemma":0.0013316714,"threshold_uncertainty_score":0.046432793},"labels":[],"label_agreement":null},{"id":"W1602087588","doi":"10.1109/pes.2003.1270417","title":"Congestion rents allocation based on transmission usage","year":2004,"lang":"en","type":"article","venue":"2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Clearance; Economic rent; Node (physics); Computer science; Mathematical optimization; Transmission (telecommunications); Transmission system; Outcome (game theory); Distribution (mathematics); Optimal allocation; Economics; Telecommunications; Microeconomics; Mathematics; Engineering","score_opus":0.0056318785579263005,"score_gpt":0.19526021425172096,"score_spread":0.18962833569379467,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1602087588","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016994013,0.00014985025,0.97891825,0.00008265421,0.000037203547,0.000052631593,0.000029104009,0.00019775424,0.0035385527],"genre_scores_gemma":[0.79824096,0.00023564167,0.19425058,0.000039356095,0.00008802305,0.00013786959,0.00007421812,0.0002337856,0.0066995937],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995987,0.00014658939,0.0000143869365,0.000053540276,0.00013542017,0.0000513943],"domain_scores_gemma":[0.99949527,0.00024272251,0.000049793758,0.00004577772,0.00013393664,0.00003246151],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007975781,0.0004948645,0.0007615076,0.0007569769,0.00035263758,0.0008159512,0.00066982815,0.00036018927,0.0042381505],"category_scores_gemma":[0.0028938034,0.0003591599,0.00033823715,0.00039550485,0.0004634033,0.0013561222,0.000558793,0.0005046216,0.00041554507],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013315435,0.000054910928,0.0011483983,0.00009954176,0.000037724254,0.000070896145,0.000108112385,0.7844489,0.0057995184,0.04336416,0.0024354453,0.16229916],"study_design_scores_gemma":[0.0000069839784,0.000010028598,0.0002528761,0.000004519605,0.000005273342,0.000014918391,0.000007220298,0.99435234,0.0007022629,0.0037640329,0.0008701837,0.000009291687],"about_ca_topic_score_codex":0.003191559,"about_ca_topic_score_gemma":0.004263855,"teacher_disagreement_score":0.0042381505,"about_ca_system_score_codex":0.0009786162,"about_ca_system_score_gemma":0.000651478,"threshold_uncertainty_score":0.014178038},"labels":[],"label_agreement":null},{"id":"W160608422","doi":"10.1007/0-306-47663-0_10","title":"An Interior-Point/Cutting-Plane Algorithm to Solve the Dual Unit Commitment Problem — on Dual Variables, Duality Gap, and Cost Recovery","year":2005,"lang":"en","type":"book-chapter","venue":"Kluwer Academic Publishers eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"University of Waterloo; Consejo Nacional de Ciencia y Tecnología","keywords":"Duality gap; Dual (grammatical number); Duality (order theory); Mathematical optimization; Convergence (economics); Cutting-plane method; Differentiable function; Bundle; Strong duality; Point (geometry); Mathematics; Plane (geometry); Computer science; Algorithm; Optimization problem; Mathematical analysis; Geometry; Pure mathematics; Economics","score_opus":0.020120501235974014,"score_gpt":0.23653636906287745,"score_spread":0.21641586782690345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W160608422","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008720557,0.00018628352,0.99504846,0.00006377377,0.000037141974,0.00002512004,0.000015961621,0.0001225956,0.0036285822],"genre_scores_gemma":[0.021171354,0.00046452877,0.97339994,0.000072838106,0.00003569587,0.00014673626,0.00010115966,0.00019662578,0.004411018],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996124,0.0001533836,0.000018887216,0.00004959693,0.00013703949,0.00002876114],"domain_scores_gemma":[0.99967444,0.00018732439,0.000021135298,0.00003889917,0.00006651478,0.000011801658],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010426373,0.0011295188,0.0012386616,0.000589923,0.00044448988,0.0010468399,0.0014009671,0.0012298445,0.006943785],"category_scores_gemma":[0.0017016326,0.0007102685,0.00095490087,0.0014282335,0.0007249982,0.0012951759,0.0010953362,0.003396375,0.0024134894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000067200184,0.00012845731,0.00022276342,0.00030131367,0.0000450747,0.000117014926,0.000119636075,0.5172604,0.003278335,0.16710721,0.014178273,0.2971744],"study_design_scores_gemma":[0.000017702485,0.000033646353,0.000046448436,0.000028390707,0.000007769148,0.00008031106,0.000017024575,0.95741296,0.0013857358,0.03082868,0.010132958,0.000008391414],"about_ca_topic_score_codex":0.0012642195,"about_ca_topic_score_gemma":0.0008921071,"teacher_disagreement_score":0.006943785,"about_ca_system_score_codex":0.0004667593,"about_ca_system_score_gemma":0.000899248,"threshold_uncertainty_score":0.023229301},"labels":[],"label_agreement":null},{"id":"W1606128843","doi":"10.22004/ag.econ.59701","title":"Managing Water Shortages in the Western Electricity Grids","year":2010,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydroelectricity; Electricity; Wind power; Environmental science; Renewable energy; Tonne; Fossil fuel; Pumped-storage hydroelectricity; Variable renewable energy; Natural resource economics; Economic shortage; Water resource management; Energy storage; Economics; Engineering; Distributed generation; Waste management","score_opus":0.01525398814890787,"score_gpt":0.2671587913304352,"score_spread":0.2519048031815273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1606128843","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9181259,0.00053682196,0.029120114,0.0024849162,0.000060400802,0.0001097466,0.0008123759,0.0002518592,0.048497945],"genre_scores_gemma":[0.99342245,0.00018390027,0.0019279963,0.00005375439,0.000008018258,0.000016264225,0.0001117461,0.000016559594,0.0042592916],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998685,0.00004219661,0.0000032185437,0.000015410442,0.000018402945,0.00005227399],"domain_scores_gemma":[0.99982315,0.000073890405,0.000028743867,0.000007129263,0.000031207066,0.000035959798],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025282183,0.0003532818,0.000339576,0.00027157195,0.00073526695,0.0012382759,0.00054304994,0.0006691821,0.0033943164],"category_scores_gemma":[0.00092804123,0.00028672063,0.00015989562,0.0007201243,0.00068958034,0.0008097528,0.0006676857,0.000461783,0.00013338897],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009887667,0.00004403072,0.005844128,0.000034921537,0.000021693615,0.00036693964,0.00009710034,0.9717419,0.00065692456,0.007964081,0.0034889546,0.009640425],"study_design_scores_gemma":[0.00004730585,0.000062725325,0.006753973,0.00002136168,0.00002253727,0.000097769145,0.0009385305,0.9741624,0.00045775433,0.011652304,0.005762244,0.000021095419],"about_ca_topic_score_codex":0.33042142,"about_ca_topic_score_gemma":0.41407,"teacher_disagreement_score":0.33042142,"about_ca_system_score_codex":0.0027196815,"about_ca_system_score_gemma":0.0022386326,"threshold_uncertainty_score":0.6569963},"labels":[],"label_agreement":null},{"id":"W166553738","doi":"10.2316/journal.203.2009.3.203-3590","title":"GENERATOR BIDDING STRATEGIES IN A COMPETITIVE ELECTRICITY MARKET WITH DERATING AND BID-SEGMENT CONSIDERATIONS","year":2009,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bidding; Electricity market; Profit (economics); Market clearing; Electricity; Generator (circuit theory); Microeconomics; Perfect competition; Economics; Electrical engineering; Engineering","score_opus":0.0044065185804632555,"score_gpt":0.2026753780731858,"score_spread":0.19826885949272255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W166553738","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19933943,0.0006433073,0.75302875,0.0006662775,0.00006142226,0.00024165357,0.00020754046,0.00020336502,0.045608275],"genre_scores_gemma":[0.9617516,0.00022815305,0.033156823,0.000062684376,0.000019523815,0.00006774256,0.0000600829,0.00006629648,0.0045871306],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990073,0.0005452425,0.000035761303,0.000070365524,0.00020348496,0.00013793439],"domain_scores_gemma":[0.9989243,0.0006045915,0.00013125363,0.000051564188,0.00020886744,0.00007940752],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017989951,0.000649255,0.00078753685,0.00044114504,0.0004279416,0.0016525035,0.0012224581,0.0010035546,0.0035287314],"category_scores_gemma":[0.0036420103,0.00052339165,0.00044059724,0.00053837855,0.00059092045,0.0023476512,0.0005720603,0.00059880543,0.0007357888],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023841852,0.000068895024,0.0008320759,0.00009126524,0.00003422463,0.0003389769,0.00014570534,0.77760684,0.002739475,0.1916475,0.00228372,0.023972942],"study_design_scores_gemma":[0.000025648571,0.00006297426,0.00023250146,0.0000045385414,0.000010144686,0.00009464804,0.000043952634,0.96890455,0.00037798373,0.029111048,0.0011178566,0.000014155721],"about_ca_topic_score_codex":0.0024078246,"about_ca_topic_score_gemma":0.0036660158,"teacher_disagreement_score":0.0035287314,"about_ca_system_score_codex":0.0010979327,"about_ca_system_score_gemma":0.0011011794,"threshold_uncertainty_score":0.011804819},"labels":[],"label_agreement":null},{"id":"W170944168","doi":"10.15173/esr.v15i1.504","title":"Empirical Assessment of Market Power in the Alberta Wholesale Electricity Market","year":2007,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Market power; Price elasticity of demand; Margin (machine learning); Economics; Marginal cost; Microeconomics; Electricity; Electricity market; Lerner index; Sample (material); Industrial organization; Business","score_opus":0.01813228344376835,"score_gpt":0.313628202834778,"score_spread":0.29549591939100966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W170944168","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98274153,0.00044090184,0.00055774505,0.00019941597,0.0000032319574,0.000012267788,0.00026373361,0.00001096702,0.015770214],"genre_scores_gemma":[0.9989814,0.00010853729,0.00008231324,0.000008127489,0.0000031837756,0.0000015496535,0.00017681149,0.0000012819138,0.0006367564],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994475,0.000105179104,0.000017436447,0.00004069466,0.00032030695,0.000068921196],"domain_scores_gemma":[0.9956109,0.0022867164,0.00100394,0.00010854942,0.0007703633,0.00021948361],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094467035,0.00015489741,0.0002109957,0.0016773384,0.00030157974,0.0013453228,0.00048743133,0.00024885093,0.0019208073],"category_scores_gemma":[0.006764796,0.00011599276,0.00014931597,0.0030833506,0.00091015024,0.00079518184,0.0003830591,0.00031705204,0.00013415367],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021128503,0.00012814095,0.9327488,0.00007675303,0.00016208162,0.0005567599,0.0009252944,0.021371797,0.001380553,0.016889727,0.0016055219,0.023943234],"study_design_scores_gemma":[0.000014386521,0.00003280885,0.97160506,0.00001721621,0.00002578069,0.000058838938,0.0014408305,0.02208522,0.00030529796,0.002302713,0.0020958225,0.000015965394],"about_ca_topic_score_codex":0.40401077,"about_ca_topic_score_gemma":0.5935066,"teacher_disagreement_score":0.5959892,"about_ca_system_score_codex":0.0040365052,"about_ca_system_score_gemma":0.0020625296,"threshold_uncertainty_score":0.8033183},"labels":[],"label_agreement":null},{"id":"W1721191018","doi":"10.1007/978-3-642-23193-3_2","title":"Optimization-Based Bidding in Day-Ahead Electricity Auction Markets: A Review of Models for Power Producers","year":2011,"lang":"en","type":"review","venue":"Energy systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Bidding; Mathematical optimization; Competition (biology); Linear programming; Integer programming; Computer science; Electricity; Schedule; Power system simulation; Stochastic programming; Operations research; Microeconomics; Real-time bidding; Electricity market; Economics; Power (physics); Electric power system; Mathematics; Engineering","score_opus":0.024619086735385612,"score_gpt":0.2457129667967158,"score_spread":0.22109388006133018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1721191018","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028898204,0.8813006,0.103697345,0.0009932631,0.0002856078,0.000056450255,0.00016303048,0.000114681774,0.010499227],"genre_scores_gemma":[0.046748176,0.9155775,0.033034768,0.00032744775,0.0005214233,0.00007503903,0.00030868466,0.000066468725,0.003340432],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993753,0.00020527505,0.00005949085,0.000089284804,0.00023512085,0.00003556483],"domain_scores_gemma":[0.9989065,0.0007335453,0.000101575686,0.000049078666,0.00019011217,0.000019192375],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014205667,0.0016228195,0.0028568655,0.0011114135,0.0002483982,0.002051331,0.002528005,0.0011666801,0.0025173835],"category_scores_gemma":[0.0020380102,0.00073933264,0.0013436441,0.0037778101,0.0006162849,0.0024295282,0.00074816233,0.0013324356,0.001040606],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011066202,0.0002720919,0.0007687585,0.008559399,0.00029171977,0.00014967515,0.000065236316,0.18810223,0.0008174952,0.056171335,0.017187009,0.7275043],"study_design_scores_gemma":[0.00011536847,0.00042930088,0.0022053912,0.004410528,0.000660591,0.0013662033,0.00021484797,0.4734235,0.0023453766,0.1510206,0.36359155,0.00021682605],"about_ca_topic_score_codex":0.00267456,"about_ca_topic_score_gemma":0.0032709916,"teacher_disagreement_score":0.0028568655,"about_ca_system_score_codex":0.0007266818,"about_ca_system_score_gemma":0.0011865327,"threshold_uncertainty_score":0.008421421},"labels":[],"label_agreement":null},{"id":"W1725922051","doi":"","title":"El poder de mercado bajo el nuevo diseño del Pool eléctrico Español","year":2009,"lang":"es","type":"article","venue":"El Repositorio Institucional de la Universidad EAFIT (Universidad EAFIT)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Decree; Quarter (Canadian coin); Electricity market; Order (exchange); Market power; Economics; Electricity; Humanities; Economy; Welfare economics; Business; Geography; Market economy; Engineering; Finance; Art; Electrical engineering","score_opus":0.003661605954150395,"score_gpt":0.22033446316826946,"score_spread":0.21667285721411908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1725922051","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2603652,0.013868601,0.03300853,0.018617654,0.0013416653,0.00012783086,0.002597443,0.0015362302,0.6685368],"genre_scores_gemma":[0.64493203,0.009676305,0.008107891,0.0014994121,0.00043664023,0.00009504,0.00196674,0.0003195473,0.33296648],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994943,0.00009070293,0.0000216637,0.00010876984,0.00018722437,0.00009730884],"domain_scores_gemma":[0.99967706,0.000050526876,0.00004645499,0.000038310256,0.00015160396,0.0000360158],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011655998,0.0005149421,0.00047097387,0.0005525066,0.00077829434,0.0026114848,0.0006471672,0.0010691818,0.020330664],"category_scores_gemma":[0.0015596264,0.0001999477,0.0003823225,0.00091373787,0.00057066453,0.0015693494,0.0010991944,0.0014477093,0.0055012936],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014644931,0.00028069608,0.016222747,0.000827405,0.000073254996,0.0018383027,0.0028448848,0.018754236,0.005828532,0.13996287,0.13290381,0.67899877],"study_design_scores_gemma":[0.00021465027,0.0002925358,0.02005382,0.000761958,0.000054815664,0.00048980996,0.002306058,0.0064059217,0.003311582,0.020283572,0.94575524,0.00007005916],"about_ca_topic_score_codex":0.027152343,"about_ca_topic_score_gemma":0.034039263,"teacher_disagreement_score":0.027152343,"about_ca_system_score_codex":0.002368142,"about_ca_system_score_gemma":0.0026038701,"threshold_uncertainty_score":0.06801283},"labels":[],"label_agreement":null},{"id":"W1751048546","doi":"10.7202/701620ar","title":"L’Hydro-électricité du Québec : Produire pour consommer ou produire pour exporter?","year":2005,"lang":"en","type":"article","venue":"Études internationales","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Université Laval","funders":"","keywords":"Exportation; Impossibility; Production (economics); Electricity; Consumption (sociology); Economics; Welfare economics; Economic surplus; Economy; Humanities; Microeconomics; Political science; Computer science; Sociology; Market economy; Engineering; Welfare; Social science; Art","score_opus":0.011105924511616558,"score_gpt":0.21688444573727494,"score_spread":0.20577852122565837,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1751048546","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5680717,0.020887757,0.023336537,0.044050723,0.00047795638,0.00009317897,0.001502573,0.00006766597,0.34151185],"genre_scores_gemma":[0.967037,0.002266349,0.0017957712,0.0004828422,0.000032500102,0.000010726373,0.000115945746,0.000010808707,0.028248092],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998098,0.0000394193,0.0000039364545,0.000028320588,0.000038687438,0.000079790334],"domain_scores_gemma":[0.9997466,0.00007209569,0.000037267415,0.000008064925,0.000083883024,0.000051996612],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031532266,0.0002468798,0.00021925259,0.00031848438,0.0009312344,0.0028499938,0.00045616718,0.0007054332,0.011161126],"category_scores_gemma":[0.000924191,0.000107898624,0.00015440621,0.00080265925,0.0012942029,0.00090867415,0.00035641654,0.00061508425,0.00025357355],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052829337,0.00021489056,0.07989488,0.00059769157,0.00019546809,0.0016523274,0.0015468552,0.067138284,0.00741439,0.5734268,0.048739783,0.21865024],"study_design_scores_gemma":[0.0001575053,0.0004054887,0.25255972,0.0009442454,0.00023243859,0.0010763889,0.018237565,0.17704017,0.00510764,0.121102326,0.4228886,0.00024790422],"about_ca_topic_score_codex":0.88884884,"about_ca_topic_score_gemma":0.9428914,"teacher_disagreement_score":0.11115116,"about_ca_system_score_codex":0.016634248,"about_ca_system_score_gemma":0.008072073,"threshold_uncertainty_score":0.22361147},"labels":[],"label_agreement":null},{"id":"W1777904611","doi":"","title":"Simulations de séries temporelles dans les réseaux électriques: applications au stockage thermique pour l'équilibrage de la production éolienne","year":2011,"lang":"fr","type":"article","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Physics; Political science; Art","score_opus":0.011340128972764218,"score_gpt":0.22324876435367322,"score_spread":0.211908635380909,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1777904611","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7275968,0.000997778,0.22788048,0.0012365109,0.00033713668,0.00021210618,0.0017031847,0.0009486903,0.039087176],"genre_scores_gemma":[0.97976893,0.00030426026,0.012566912,0.000079983176,0.000016680524,0.000135536,0.0003413541,0.00009212769,0.006694282],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99980086,0.00006761984,0.000011513689,0.00003366923,0.000053865086,0.000032446398],"domain_scores_gemma":[0.9986689,0.000925896,0.000090229856,0.00006191361,0.00019694841,0.000056178545],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006241335,0.00061295496,0.00058696175,0.00043513253,0.00065386074,0.0011006051,0.00082172244,0.0012622061,0.0055781608],"category_scores_gemma":[0.002461372,0.00036814366,0.00080565707,0.00060757744,0.00058710435,0.0007517238,0.00053746207,0.00095987035,0.00034033865],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034538116,0.0000146422635,0.00058931083,0.000023845634,0.000008208937,0.000042098658,0.000031739055,0.99605113,0.0007609386,0.000823724,0.00013767477,0.0014822162],"study_design_scores_gemma":[0.0000089648265,0.000022637718,0.00023718752,0.000008156296,0.0000052379564,0.0000055598252,0.000030459387,0.9981766,0.0006060432,0.0003584902,0.0005359222,0.000004692364],"about_ca_topic_score_codex":0.047890514,"about_ca_topic_score_gemma":0.030425936,"teacher_disagreement_score":0.047890514,"about_ca_system_score_codex":0.0012578982,"about_ca_system_score_gemma":0.0011987671,"threshold_uncertainty_score":0.095223546},"labels":[],"label_agreement":null},{"id":"W1804491171","doi":"","title":"Risk-sensitive investment in renewable distributed generation under uncertainty due to post-feed-in tariff policy","year":2012,"lang":"en","type":"article","venue":"2nd International Conference on the Developments in Renewable Energy Technology (ICDRET 2012)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Tariff; Investment (military); Renewable energy; Risk aversion (psychology); Duration (music); Feed-in tariff; Rate of return; Environmental economics; Photovoltaic system; Economics; Payment; Business; Microeconomics; Natural resource economics; Finance; Engineering; Expected utility hypothesis; Energy policy; International economics; Financial economics","score_opus":0.016687020109253308,"score_gpt":0.2367154865663964,"score_spread":0.2200284664571431,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1804491171","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45230117,0.0011077708,0.51449955,0.0031026914,0.00012454539,0.00018999727,0.0006063259,0.00020912918,0.027858807],"genre_scores_gemma":[0.98795545,0.0002794356,0.0058416,0.000052658892,0.000020767287,0.00006753068,0.000049234444,0.00001700251,0.0057163443],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988819,0.00057810644,0.000038445884,0.00016746637,0.00011673511,0.00021743904],"domain_scores_gemma":[0.9965301,0.002253463,0.00071501033,0.00009068853,0.00019494927,0.00021571714],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027296725,0.0013759958,0.0012406299,0.00064946385,0.00056529423,0.002309083,0.0015807645,0.0032679522,0.0027101198],"category_scores_gemma":[0.0076901875,0.0009827862,0.0010946243,0.00069852953,0.001632443,0.001976234,0.0012286133,0.002195745,0.00022160394],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006110038,0.000031625623,0.00058269507,0.000021614675,0.000020745674,0.00022044739,0.000032950586,0.9669712,0.00046235506,0.029977974,0.00017940407,0.0014378857],"study_design_scores_gemma":[0.00001963837,0.000040907868,0.00021458324,0.000006922711,0.000016999516,0.00002785721,0.000022657472,0.9847536,0.00016673632,0.014557613,0.00015772102,0.000014673489],"about_ca_topic_score_codex":0.006891954,"about_ca_topic_score_gemma":0.0043580746,"teacher_disagreement_score":0.006891954,"about_ca_system_score_codex":0.0027684672,"about_ca_system_score_gemma":0.0012885806,"threshold_uncertainty_score":0.020086765},"labels":[],"label_agreement":null},{"id":"W1807300116","doi":"10.1109/pcicon.1991.162944","title":"Outlook for electrical energy from utilities: 1991-1999","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Deregulation; Electric utility; Computer science; Energy (signal processing); Energy mix; Fuel cells; Operations research; Telecommunications; Engineering; Electrical engineering; Economics; Electricity generation; Mathematics; Physics; Market economy","score_opus":0.01045459119502078,"score_gpt":0.1772369109238107,"score_spread":0.1667823197287899,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1807300116","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02356278,0.024566641,0.0035248657,0.0053434744,0.0026933467,0.00016213901,0.3419456,0.0011462623,0.597055],"genre_scores_gemma":[0.10380187,0.045644645,0.004711983,0.0010442656,0.00046660306,0.0002697319,0.3169287,0.0002563158,0.5268758],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998374,0.000012303996,0.0000059273057,0.000016903885,0.00010667173,0.00002076742],"domain_scores_gemma":[0.9997931,0.000009958631,0.00001755266,0.0000060421576,0.00015701479,0.000016387738],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019325501,0.0008485027,0.0002083679,0.0010799618,0.00035830136,0.0008850946,0.00032139273,0.0005931991,0.038598984],"category_scores_gemma":[0.00043517983,0.00018377914,0.00015902528,0.0035517141,0.000053798325,0.001135204,0.0003577919,0.0006896588,0.025846083],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025747102,0.00004071224,0.0038011528,0.0006893641,0.00001971889,0.00013752219,0.000043645294,0.003957498,0.0007505933,0.0058623864,0.85706854,0.12737145],"study_design_scores_gemma":[0.000016289434,0.00002545161,0.012845005,0.00016842705,0.000013401034,0.00010465427,0.00008076126,0.0006667299,0.0005466282,0.0010884476,0.9844364,0.0000078932835],"about_ca_topic_score_codex":0.021221174,"about_ca_topic_score_gemma":0.053363595,"teacher_disagreement_score":0.038598984,"about_ca_system_score_codex":0.0021877964,"about_ca_system_score_gemma":0.001268519,"threshold_uncertainty_score":0.12912649},"labels":[],"label_agreement":null},{"id":"W1820012989","doi":"10.5547/01956574.37.1.edev","title":"Integrating Thermal and Hydro Electricity Markets: Economic and Environmental Costs of not Harmonizing Pricing Rules","year":2015,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"HEC Montréal","funders":"","keywords":"Inefficiency; Electricity; Greenhouse gas; Carbon price; Natural resource economics; Tonne; Economics; Electricity market; Vertical integration; Environmental economics; Marginal cost; Consumption (sociology); Welfare; Business; Industrial organization; Microeconomics; Market economy; Waste management","score_opus":0.009276540163444702,"score_gpt":0.17667499361650432,"score_spread":0.16739845345305962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1820012989","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9429241,0.00041795237,0.026715718,0.0015135412,0.0000418317,0.00017956067,0.0003373589,0.00008787341,0.02778223],"genre_scores_gemma":[0.9953348,0.00010250356,0.0034579535,0.000088139976,0.000008967413,0.000030040295,0.000065791806,0.0000108910235,0.0009008317],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99888426,0.0004554181,0.00003931298,0.0000931996,0.00024095649,0.0002868741],"domain_scores_gemma":[0.9969909,0.001521285,0.00043805092,0.00048357729,0.00034716123,0.00021897774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018826949,0.0004446145,0.00068960397,0.00030888355,0.00073870696,0.002673733,0.0011415053,0.0012910186,0.0041560917],"category_scores_gemma":[0.009202816,0.0004904694,0.00073331984,0.00072398735,0.0012274354,0.0035220408,0.0016521062,0.0015769821,0.0001775996],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002509965,0.00027124988,0.015273282,0.000067500885,0.00008375327,0.00038799096,0.000173802,0.88349646,0.00096008583,0.070581086,0.0010527152,0.027401015],"study_design_scores_gemma":[0.0002251017,0.0003420099,0.023478657,0.0000751314,0.00014580222,0.00020288475,0.0010143963,0.9027651,0.0008026896,0.06552279,0.0053393734,0.00008613224],"about_ca_topic_score_codex":0.0884003,"about_ca_topic_score_gemma":0.057151347,"teacher_disagreement_score":0.0884003,"about_ca_system_score_codex":0.0030527797,"about_ca_system_score_gemma":0.0038690877,"threshold_uncertainty_score":0.17577153},"labels":[],"label_agreement":null},{"id":"W1831589860","doi":"10.1109/lescpe.2003.1204670","title":"Transaction impact analysis and its application in electricity markets","year":2003,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Database transaction; Electricity market; Electricity; Computer science; Transmission system; Transmission (telecommunications); Security analysis; Electric power system; Congestion management; Electric power transmission; Index (typography); Voltage; Reliability engineering; Computer security; Operations research; Telecommunications; Electrical engineering; Engineering; Power (physics); Database","score_opus":0.003219850519556982,"score_gpt":0.20442756403558432,"score_spread":0.20120771351602734,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1831589860","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050769016,0.0015513494,0.92226005,0.00034903997,0.0001029831,0.00017229228,0.00012495393,0.00030168673,0.024368523],"genre_scores_gemma":[0.89208436,0.001567924,0.102780454,0.000057796246,0.0001451701,0.00014411652,0.00010371555,0.00007366369,0.0030428804],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986596,0.00056537235,0.00005274654,0.00007334846,0.000583396,0.000065553664],"domain_scores_gemma":[0.9954234,0.003422094,0.00034862105,0.00020118036,0.0005343624,0.00007041744],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001675294,0.00078320364,0.00070144306,0.0023567148,0.00052025757,0.0013215018,0.00065479433,0.0005224339,0.0045197024],"category_scores_gemma":[0.0067157587,0.00024055454,0.0007042432,0.0030034562,0.0009802053,0.0021434093,0.0006973549,0.0009419305,0.00030124266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015513698,0.00012529836,0.0067363377,0.00028460813,0.00014468867,0.00049416116,0.00022304663,0.52692884,0.0044389456,0.20271201,0.0019017817,0.25585526],"study_design_scores_gemma":[0.0000063868574,0.00006750239,0.0017663606,0.000021466243,0.00002143977,0.00015320141,0.00008863956,0.93584377,0.0017865462,0.057828594,0.0023922503,0.00002386393],"about_ca_topic_score_codex":0.0016355617,"about_ca_topic_score_gemma":0.0010721204,"teacher_disagreement_score":0.0045197024,"about_ca_system_score_codex":0.00069718977,"about_ca_system_score_gemma":0.00051923434,"threshold_uncertainty_score":0.01511991},"labels":[],"label_agreement":null},{"id":"W1847163448","doi":"10.1109/pes.2005.1489347","title":"Multi-interval optimization for real-time power system scheduling in the ontario electricity market","year":2005,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2005","topic":"Electric Power System Optimization","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Economic dispatch; Scheduling (production processes); Computer science; Operator (biology); Interval (graph theory); Electricity; Electricity market; Electric power system; Power system simulation; Operations research; Real-time computing; Mathematical optimization; Operations management; Power (physics); Engineering; Electrical engineering","score_opus":0.006059586496709516,"score_gpt":0.20148440079941146,"score_spread":0.19542481430270195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1847163448","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57707834,0.001165843,0.3996367,0.00087067595,0.00008515237,0.00016024006,0.0005430755,0.00049639674,0.019963471],"genre_scores_gemma":[0.9751746,0.00014568352,0.022504797,0.000023367475,0.000017048242,0.00004433158,0.000120318546,0.0000558434,0.0019139897],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996611,0.00012408987,0.0000117063555,0.00003743848,0.000105874315,0.000059895137],"domain_scores_gemma":[0.99962974,0.00020496282,0.00005746042,0.000010899626,0.00006702343,0.000030006508],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008387559,0.00048509776,0.0005763994,0.00043694588,0.00046834434,0.00076221616,0.00067362725,0.00037564282,0.0013799913],"category_scores_gemma":[0.0023301346,0.00038742792,0.00023006955,0.00063543225,0.00038470115,0.00043654826,0.00031366938,0.00043731922,0.00010479971],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005803025,0.000012693885,0.0005514654,0.000014357442,0.000008023054,0.0000191911,0.000023062024,0.99091786,0.00030191627,0.0012673619,0.00042783195,0.0063981446],"study_design_scores_gemma":[0.0000068299173,0.0000053931385,0.00038020345,8.858515e-7,0.0000016197217,0.0000014257887,0.0000066952475,0.9990559,0.0000634838,0.0002932037,0.00018231143,0.0000020809916],"about_ca_topic_score_codex":0.30852276,"about_ca_topic_score_gemma":0.33492598,"teacher_disagreement_score":0.69147724,"about_ca_system_score_codex":0.0034707468,"about_ca_system_score_gemma":0.0033416236,"threshold_uncertainty_score":0.6134539},"labels":[],"label_agreement":null},{"id":"W1858155706","doi":"","title":"The Effects of Competition Policy on TFP Growth: Some Evidence from the Malaysian Electricity Supply Industry","year":2009,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Total factor productivity; Electricity; Mains electricity; Productivity; Competition (biology); Industrial organization; Electric power industry; Economics; Index (typography); Government (linguistics); Business; Quarter (Canadian coin); Monetary economics; Power (physics); Macroeconomics; Engineering","score_opus":0.01298600534602994,"score_gpt":0.2670560271587616,"score_spread":0.25407002181273164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1858155706","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9872357,0.0027282177,0.00035390898,0.00069953554,0.000011286928,0.000014102271,0.0006642001,0.0000118926655,0.008281112],"genre_scores_gemma":[0.99771714,0.0011469643,0.00008002238,0.00005612126,0.000015340283,0.0000037051618,0.00031727765,0.0000020968791,0.0006613662],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991543,0.000280631,0.000070795926,0.00012971871,0.00021154454,0.00015303897],"domain_scores_gemma":[0.9828568,0.008916996,0.005283725,0.0004493906,0.0018315351,0.0006615372],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012908526,0.00027781952,0.00034987828,0.0013988848,0.00033385245,0.0012703483,0.0003290269,0.0004346947,0.0022436182],"category_scores_gemma":[0.007953675,0.00011863764,0.00041851873,0.0022475114,0.0010473881,0.0009475166,0.0007405977,0.0006768719,0.00038101996],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011938361,0.0002928952,0.9041356,0.0006876276,0.00031843965,0.0008804823,0.001150498,0.009625693,0.0014692883,0.0052956436,0.0021572497,0.07279278],"study_design_scores_gemma":[0.000030344358,0.00038741704,0.9880818,0.00012501057,0.0000921517,0.00012776036,0.0018396325,0.002762303,0.0016010297,0.0010028342,0.003921573,0.000028276632],"about_ca_topic_score_codex":0.035846688,"about_ca_topic_score_gemma":0.03551211,"teacher_disagreement_score":0.035846688,"about_ca_system_score_codex":0.0016294206,"about_ca_system_score_gemma":0.0009328345,"threshold_uncertainty_score":0.07127607},"labels":[],"label_agreement":null},{"id":"W186602825","doi":"","title":"Peaking Capacity in Restructured Power Systems","year":2000,"lang":"en","type":"dissertation","venue":"BIBSYS Brage (BIBSYS (Norway))","topic":"Electric Power System Optimization","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Power (physics); Theme (computing); Electricity demand; Electric power system; Business; Economics; Environmental economics; Electricity generation; Engineering; Computer science; Electrical engineering; Physics","score_opus":0.010583949086896893,"score_gpt":0.20284103068818127,"score_spread":0.19225708160128438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W186602825","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4822768,0.0062884493,0.2685534,0.0038347512,0.00049472344,0.00013690404,0.0005157661,0.0005764832,0.23732278],"genre_scores_gemma":[0.985152,0.0010546944,0.0041262824,0.00005713814,0.00008718444,0.000020829853,0.00006959187,0.000029578041,0.00940268],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997496,0.0000638364,0.000011104608,0.00006178019,0.000060846985,0.000052807434],"domain_scores_gemma":[0.99965763,0.00014605866,0.00006725966,0.00004567273,0.00005061188,0.000032811517],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031747157,0.0002243755,0.0002151516,0.00037073792,0.00044849556,0.0013101028,0.0008452567,0.0004921073,0.006804966],"category_scores_gemma":[0.001185325,0.00021063809,0.0003046865,0.00060270325,0.00095380296,0.0015617469,0.00087636325,0.0008603574,0.00044768315],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007186046,0.000036697344,0.001304207,0.00013039727,0.000024132112,0.00080067565,0.00048044644,0.5892283,0.002190402,0.36017144,0.004175409,0.04138609],"study_design_scores_gemma":[0.000033310494,0.00012606558,0.002267116,0.00009141576,0.000029398036,0.00044171742,0.00058511685,0.6425435,0.0016189257,0.31903818,0.0331793,0.000045955112],"about_ca_topic_score_codex":0.0043976633,"about_ca_topic_score_gemma":0.0027176298,"teacher_disagreement_score":0.006804966,"about_ca_system_score_codex":0.0010737998,"about_ca_system_score_gemma":0.00047176646,"threshold_uncertainty_score":0.022764921},"labels":[],"label_agreement":null},{"id":"W1871762981","doi":"","title":"El modelo HRV para la expansión óptima de redes de transmisión: Una aplicación a la red eléctrica de Ontario","year":2012,"lang":"es","type":"article","venue":"LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.017666369273542946,"score_gpt":0.2450029443137632,"score_spread":0.22733657504022026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1871762981","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7462337,0.0011948394,0.15803322,0.001480055,0.00012692806,0.00015683887,0.0015044138,0.000697165,0.090572864],"genre_scores_gemma":[0.9789699,0.00027741454,0.005359546,0.000032017408,0.00001054339,0.000027082584,0.00020889925,0.000042922467,0.015071761],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998934,0.000020315536,0.0000028377558,0.000018670517,0.0000265634,0.000038117214],"domain_scores_gemma":[0.99979216,0.00007372032,0.000017948068,0.000010392142,0.00008550467,0.000020247293],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030622265,0.0005068229,0.00037290883,0.0002544277,0.0006114044,0.0012256894,0.0007844573,0.0008384674,0.0043222904],"category_scores_gemma":[0.00093594653,0.00028722134,0.00046594156,0.00036156178,0.00041318688,0.00043593798,0.0003857454,0.00062713784,0.00029043763],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004280149,0.000010634481,0.0012794823,0.000025931246,0.000010153108,0.00006017138,0.000045262,0.99078405,0.0004975197,0.0017836448,0.0006049532,0.004855383],"study_design_scores_gemma":[0.000016432112,0.000020368694,0.0010481518,0.0000070020533,0.000012377364,0.00000708793,0.00005472536,0.9969182,0.00017674695,0.00037204337,0.0013614609,0.0000053962303],"about_ca_topic_score_codex":0.7265682,"about_ca_topic_score_gemma":0.67056304,"teacher_disagreement_score":0.27343178,"about_ca_system_score_codex":0.0045873444,"about_ca_system_score_gemma":0.0045435596,"threshold_uncertainty_score":0.5500841},"labels":[],"label_agreement":null},{"id":"W1897310719","doi":"10.3386/w21627","title":"Natural Gas Prices and Coal Displacement: Evidence from Electricity Markets","year":2015,"lang":"en","type":"report","venue":"National Bureau of Economic Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Natural gas; Electricity; Coal; Natural gas prices; Natural resource economics; Natural (archaeology); Oil and natural gas; Economics; Environmental science; Business; Fossil fuel; Geology; Engineering; Waste management; Paleontology; Electrical engineering","score_opus":0.1994799336872394,"score_gpt":0.4484341205846312,"score_spread":0.24895418689739182,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1897310719","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9936035,0.0008155873,0.00027499782,0.0010004431,0.0000151405075,0.00001769536,0.0005702724,0.00000876853,0.0036936933],"genre_scores_gemma":[0.9984079,0.0004865354,0.00006248853,0.0001213365,0.000025067946,0.000005248857,0.0005319778,0.0000033730535,0.00035594858],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994367,0.00020192195,0.00004202978,0.00008048531,0.00014753749,0.000091386304],"domain_scores_gemma":[0.97917396,0.009771999,0.009127913,0.00064033177,0.00070172164,0.00058407494],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013745223,0.00022172567,0.00030633653,0.0005626171,0.0003686573,0.0014531999,0.00062246603,0.0007732552,0.0034056816],"category_scores_gemma":[0.011122522,0.00022754593,0.00043053922,0.0014328716,0.0009558439,0.0017815374,0.0008355404,0.0009305466,0.00026654926],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009636227,0.0006672872,0.9609675,0.000117882635,0.00044723556,0.00068076083,0.00042889616,0.0069381497,0.00041124798,0.0064935856,0.003563754,0.018320087],"study_design_scores_gemma":[0.00019112411,0.00035128472,0.97019905,0.000048291407,0.00019176844,0.000205722,0.0022791305,0.015138403,0.00089336897,0.0049766167,0.00548034,0.000044843207],"about_ca_topic_score_codex":0.021089802,"about_ca_topic_score_gemma":0.022809241,"teacher_disagreement_score":0.021089802,"about_ca_system_score_codex":0.0006208387,"about_ca_system_score_gemma":0.00043619532,"threshold_uncertainty_score":0.041934073},"labels":[],"label_agreement":null},{"id":"W1902836177","doi":"10.15173/esr.v21i2.2770","title":"MARKET POWER IN POWER MARKETS: THE CASE OF FRENCH WHOLESALE ELECTRICITY MARKET","year":2015,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Wholesale market; Market power; Electricity market; Market share analysis; Panel data; Electricity; Economics; Power (physics); Factor market; Business; Market share; Market microstructure; Industrial organization; Market economy; Econometrics; Order (exchange); Finance","score_opus":0.015623107619507309,"score_gpt":0.24870851700162097,"score_spread":0.23308540938211367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1902836177","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79280317,0.0187895,0.03862343,0.0076695895,0.00016085472,0.00009666256,0.00092574727,0.00014276552,0.14078829],"genre_scores_gemma":[0.9938175,0.0017107109,0.0012177567,0.000109296976,0.0001093441,0.000016414922,0.00012500344,0.000012470843,0.0028814352],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9990528,0.0004183733,0.000028041191,0.00012387111,0.00016942497,0.00020750186],"domain_scores_gemma":[0.99800974,0.0012605115,0.00031675718,0.00006989024,0.00024310924,0.00010012203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016650099,0.00050046394,0.0008813735,0.0015154456,0.0010040862,0.0049431636,0.00081204233,0.002040368,0.005523379],"category_scores_gemma":[0.005524757,0.00022726059,0.0010863846,0.001934738,0.0012513001,0.0032314968,0.00087113574,0.00096703385,0.00033161326],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000220021,0.0001995873,0.027672242,0.0004002002,0.00032110207,0.007110725,0.0012812587,0.2272634,0.0010189019,0.69269085,0.01186259,0.029959206],"study_design_scores_gemma":[0.00025886434,0.0002986352,0.045154035,0.00022675385,0.00027265996,0.0015010207,0.0027461024,0.6772329,0.0006579944,0.23787242,0.033596285,0.0001823261],"about_ca_topic_score_codex":0.054586437,"about_ca_topic_score_gemma":0.033962253,"teacher_disagreement_score":0.054586437,"about_ca_system_score_codex":0.002462432,"about_ca_system_score_gemma":0.0008924059,"threshold_uncertainty_score":0.108537436},"labels":[],"label_agreement":null},{"id":"W1904940903","doi":"10.1109/ptc.2003.1304698","title":"Mitigating market power in financial transmission-right allocations","year":2004,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Consejo Nacional de Ciencia y Tecnología","keywords":"Position (finance); Transmission (telecommunications); Quadratic programming; Node (physics); Mathematical optimization; Transmission network; Market power; Computer science; Power transmission; Dual (grammatical number); Quadratic equation; Power (physics); Business; Finance; Microeconomics; Economics; Telecommunications; Mathematics; Engineering","score_opus":0.002630452761370624,"score_gpt":0.178632672096355,"score_spread":0.1760022193349844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1904940903","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008231131,0.000109762914,0.98955846,0.0001073809,0.00001810975,0.000051806215,0.000010443383,0.00006504986,0.0018478358],"genre_scores_gemma":[0.5981966,0.00022809391,0.39887092,0.000076047254,0.00007489653,0.00017970755,0.00003460168,0.00006103737,0.0022780686],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9978042,0.0011972387,0.00007254949,0.00021091665,0.00056083966,0.00015422916],"domain_scores_gemma":[0.99707055,0.0017748369,0.0005206851,0.00022340784,0.00032940952,0.00008103419],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004963001,0.0010888184,0.0013958745,0.001215627,0.0006134982,0.0017169849,0.0014822135,0.00097258005,0.0035768885],"category_scores_gemma":[0.00831338,0.0006220277,0.00065946503,0.0009923569,0.0011089345,0.003476499,0.001463103,0.0011390027,0.000249879],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010074862,0.00010552677,0.0010353957,0.00015014851,0.000063286934,0.00025108914,0.00019787895,0.6579446,0.004649841,0.16062683,0.00102788,0.17384663],"study_design_scores_gemma":[0.000023569806,0.00011142825,0.00027115995,0.000016362428,0.000016749795,0.000109540655,0.00004921443,0.9541169,0.0017247008,0.042001702,0.0015397313,0.000019047788],"about_ca_topic_score_codex":0.00087659084,"about_ca_topic_score_gemma":0.0012314252,"teacher_disagreement_score":0.004963001,"about_ca_system_score_codex":0.0007844712,"about_ca_system_score_gemma":0.0014894628,"threshold_uncertainty_score":0.026247144},"labels":[],"label_agreement":null},{"id":"W1916939408","doi":"","title":"Algoritmo para determinar la seguridad de voltaje de un sistema eléctrico de potencia basado en sistemas de área amplia","year":2013,"lang":"es","type":"dissertation","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Physics; Humanities; Philosophy","score_opus":0.005673704611751429,"score_gpt":0.23066937661843473,"score_spread":0.2249956720066833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1916939408","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12089797,0.006741492,0.8597879,0.000381133,0.00033883966,0.0002903572,0.0003964177,0.002560858,0.0086050555],"genre_scores_gemma":[0.5990745,0.004843764,0.3775169,0.00026289455,0.00008892433,0.0003666036,0.0004275942,0.00018645856,0.01723245],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996724,0.00004486674,0.000024584453,0.00009853364,0.0001358003,0.000023800589],"domain_scores_gemma":[0.99966156,0.000100275785,0.00005919912,0.00003580777,0.0001307253,0.000012440126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052387826,0.00077650347,0.00065700343,0.00072994,0.00028980392,0.001056477,0.00074999226,0.00076787284,0.0026145705],"category_scores_gemma":[0.0008974441,0.00036835956,0.00051524973,0.00066798547,0.00030612078,0.00088182034,0.00025447257,0.0005702423,0.000883011],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006837409,0.00016475507,0.004583818,0.0014198624,0.00014494907,0.00021210645,0.00027505844,0.04107609,0.45179492,0.0033197545,0.0022062662,0.49411872],"study_design_scores_gemma":[0.00013691999,0.0017331954,0.010828769,0.0002740201,0.0005467364,0.00081660046,0.00034742572,0.42685196,0.49919578,0.0037724131,0.05535023,0.00014600516],"about_ca_topic_score_codex":0.0017595993,"about_ca_topic_score_gemma":0.0025396068,"teacher_disagreement_score":0.0026145705,"about_ca_system_score_codex":0.0006080588,"about_ca_system_score_gemma":0.00072053995,"threshold_uncertainty_score":0.008746564},"labels":[],"label_agreement":null},{"id":"W1920262488","doi":"","title":"Electricity market restructuring : perspectives from abroad","year":2014,"lang":"en","type":"article","venue":"SA Mercantile Law Journal = SA Tydskrif vir Handelsreg","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"","keywords":"Restructuring; Electricity; Generator (circuit theory); Politics; Economics; Product (mathematics); Electricity market; Grid; Power (physics); Homogeneous; Boundary (topology); Point (geometry); Corporate governance; Market economy; Business; Electrical engineering; Law; Mathematics; Political science; Engineering; Physics; Finance; Statistical physics","score_opus":0.004185137286350116,"score_gpt":0.20410083571592869,"score_spread":0.19991569842957857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1920262488","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031997103,0.0169825,0.0010070559,0.051228594,0.0003853893,0.000009043172,0.00008321651,0.000012038231,0.89829504],"genre_scores_gemma":[0.8535887,0.026668768,0.0005232735,0.013760144,0.0010242535,0.000029504576,0.00016842903,0.00005885608,0.10417797],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995524,0.00013288572,0.00001162747,0.000049286024,0.00007221958,0.0001814774],"domain_scores_gemma":[0.99950814,0.00018547822,0.000070742484,0.000025759782,0.00007095621,0.00013878872],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00072820485,0.00037007162,0.0003673373,0.001448685,0.002627437,0.008562702,0.00073854433,0.0033643045,0.016565826],"category_scores_gemma":[0.0012574405,0.00016474043,0.000531361,0.0019571,0.005991057,0.0066748126,0.0026484935,0.0042584147,0.0012175175],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016113003,0.000038759434,0.00041641534,0.00003850059,0.000002835418,0.00028557223,0.0011796218,0.0004317538,0.00006112153,0.9869086,0.0062525277,0.0043683113],"study_design_scores_gemma":[0.000036240985,0.000076899,0.0049674613,0.00080625014,0.000013025484,0.00070393377,0.017211488,0.0022339097,0.00028954368,0.37045708,0.60316145,0.00004275333],"about_ca_topic_score_codex":0.013992537,"about_ca_topic_score_gemma":0.011012157,"teacher_disagreement_score":0.016565826,"about_ca_system_score_codex":0.0075827655,"about_ca_system_score_gemma":0.0022344263,"threshold_uncertainty_score":0.055418193},"labels":[],"label_agreement":null},{"id":"W1921097830","doi":"10.1109/lescpe.2004.1356257","title":"Economic dispatch of all thermal power systems with fuzzy load","year":2004,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Economic dispatch; Electric power system; Fuzzy logic; Computer science; Mathematical optimization; Simple (philosophy); Power (physics); Control theory (sociology); Fuzzy control system; Mathematics; Artificial intelligence","score_opus":0.0034472783567471845,"score_gpt":0.17136427820815478,"score_spread":0.1679169998514076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1921097830","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.052425895,0.0003296485,0.9362685,0.00026503566,0.0000895907,0.00005656475,0.00008844988,0.00009307851,0.010383312],"genre_scores_gemma":[0.8885861,0.00034351755,0.09965789,0.000031088177,0.000074799034,0.00010101555,0.00011559629,0.000058610633,0.011031428],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995079,0.00020152175,0.000021692073,0.000051594412,0.00016518887,0.000052193725],"domain_scores_gemma":[0.9997758,0.00009966968,0.000035977817,0.00002150777,0.000041511434,0.000025568697],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008784625,0.00088312366,0.0008607009,0.0004297233,0.00047238273,0.0012106253,0.0007122023,0.00051953486,0.0022434902],"category_scores_gemma":[0.0013274975,0.0004220862,0.00049881084,0.0006859795,0.00052208296,0.0014454225,0.000624938,0.0008967573,0.0002502106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006978808,0.000012879923,0.00009497074,0.000032530053,0.000023389706,0.000055716802,0.000024099632,0.94650406,0.0007747092,0.03631811,0.0004945532,0.015595316],"study_design_scores_gemma":[0.000007423281,0.000009928172,0.000060050614,0.0000016384524,0.000003251945,0.0000064192864,0.0000065610325,0.9835617,0.00022992241,0.015574148,0.000535173,0.0000036979054],"about_ca_topic_score_codex":0.0030945027,"about_ca_topic_score_gemma":0.0038089405,"teacher_disagreement_score":0.0030945027,"about_ca_system_score_codex":0.00088618736,"about_ca_system_score_gemma":0.0008199551,"threshold_uncertainty_score":0.007505238},"labels":[],"label_agreement":null},{"id":"W1940870159","doi":"10.1109/ccece.1996.548122","title":"Economic impact of nonutility generation on hydrothermal systems with variable head hydro units","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Variable (mathematics); Hydrothermal circulation; Computer science; Energy (signal processing); Head (geology); Sensitivity (control systems); Operations research; Environmental economics; Reliability engineering; Engineering; Economics; Geology; Mathematics","score_opus":0.01808281207877837,"score_gpt":0.2055270726915986,"score_spread":0.1874442606128202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1940870159","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9644139,0.00062100973,0.023561804,0.00041193588,0.00003486864,0.000059803337,0.00016322799,0.000036179346,0.010697201],"genre_scores_gemma":[0.9985134,0.00014016568,0.0007720119,0.0000087217495,0.000004974994,0.000008310613,0.000018690234,0.0000069932944,0.0005266599],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99914825,0.00050412747,0.000018126317,0.000034229437,0.00014726455,0.00014809266],"domain_scores_gemma":[0.9954542,0.0037069274,0.0003739478,0.00008340523,0.000242632,0.0001388931],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020753378,0.00059648993,0.00064591115,0.0007243182,0.00047478412,0.0010848608,0.00065957155,0.00046986222,0.0017788556],"category_scores_gemma":[0.005863476,0.00037592085,0.00046248277,0.00071169715,0.001003207,0.0011432398,0.000785934,0.0007388597,0.000055480625],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022247402,0.000034861878,0.0019158663,0.000040693227,0.000026747071,0.0002745294,0.000016963671,0.9870777,0.00084478385,0.0052924906,0.00016717718,0.0040857648],"study_design_scores_gemma":[0.000043759468,0.00027080727,0.0042532533,0.000011563532,0.000043569118,0.00008446602,0.00010297975,0.9891235,0.0014061079,0.0042199395,0.0004182983,0.000021667733],"about_ca_topic_score_codex":0.008114792,"about_ca_topic_score_gemma":0.0088615455,"teacher_disagreement_score":0.008114792,"about_ca_system_score_codex":0.0020616208,"about_ca_system_score_gemma":0.0008502821,"threshold_uncertainty_score":0.016135097},"labels":[],"label_agreement":null},{"id":"W1951320129","doi":"10.1109/lescpe.2001.941616","title":"Linear programming based algorithm for reactive power constrained real power dispatch and pricing","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"AC power; Economic dispatch; Computer science; Mathematical optimization; Linear programming; Electric power system; Electricity; Nonlinear system; Power (physics); Voltage; Nonlinear programming; Electricity pricing; Electricity market; Algorithm; Engineering; Mathematics; Electrical engineering","score_opus":0.007818997921685443,"score_gpt":0.2075410853718087,"score_spread":0.19972208745012326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1951320129","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005513602,0.000035826455,0.9975122,0.00005669685,0.000023486155,0.000028472909,0.000019100007,0.00046361794,0.0013091736],"genre_scores_gemma":[0.063002214,0.00016796094,0.92873883,0.00023134066,0.00007886441,0.00047422457,0.00020701361,0.0003117673,0.006787725],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99912244,0.00031643966,0.000041832885,0.00014322401,0.0002887777,0.00008721832],"domain_scores_gemma":[0.99909973,0.0005472278,0.00006872574,0.0000608351,0.00019931678,0.000024236595],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010414723,0.0011189469,0.00095183984,0.0009289573,0.00065029634,0.0014600995,0.0015402605,0.0012542163,0.011349504],"category_scores_gemma":[0.0031362516,0.00059230503,0.00059247017,0.0012165201,0.0006622646,0.0014718097,0.0011245083,0.0023395603,0.0047340053],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001513158,0.00019947266,0.00023877645,0.00012900116,0.000050323604,0.000091836344,0.000074793265,0.4755864,0.0034957917,0.0516067,0.010539404,0.45783618],"study_design_scores_gemma":[0.000024148103,0.000030400124,0.000032358297,0.0000059793615,0.0000047227168,0.000026475966,0.000005976226,0.98817074,0.0009033359,0.008553258,0.0022331378,0.000009478375],"about_ca_topic_score_codex":0.003467972,"about_ca_topic_score_gemma":0.002631241,"teacher_disagreement_score":0.011349504,"about_ca_system_score_codex":0.0010064883,"about_ca_system_score_gemma":0.0014339213,"threshold_uncertainty_score":0.03796786},"labels":[],"label_agreement":null},{"id":"W1956653366","doi":"10.1109/ccece.1995.526298","title":"A summary of algorithms in reactive power pricing","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Technical University of Nova Scotia","funders":"","keywords":"AC power; Power factor; Computer science; Power (physics); Power-flow study; Load factor; Power flow; Transformer; Mathematical optimization; Electric power system; Electrical engineering; Engineering; Voltage; Mathematics","score_opus":0.007682006394205023,"score_gpt":0.18778028506699138,"score_spread":0.18009827867278635,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1956653366","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0009508659,0.0035692735,0.98018426,0.00065541797,0.00031045702,0.00012615518,0.00019352623,0.0008520711,0.013157976],"genre_scores_gemma":[0.04630576,0.010879426,0.9235267,0.0008562955,0.0011697276,0.0005889158,0.001215814,0.0008370824,0.014620287],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9975884,0.0006457184,0.0002503888,0.00044729057,0.0008773926,0.00019085307],"domain_scores_gemma":[0.9977748,0.0011088409,0.00012324173,0.00040776786,0.00052451494,0.000060883944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002054546,0.0024902865,0.0017269817,0.0017664809,0.0011640964,0.0043697967,0.0028763355,0.0028443348,0.014937961],"category_scores_gemma":[0.008912736,0.00096484215,0.0014338817,0.003777602,0.00090211054,0.0043696347,0.0017630233,0.003597836,0.010075594],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015863396,0.00021142837,0.0005680121,0.00040993557,0.00007318764,0.00010002297,0.00008579701,0.16843104,0.0011282316,0.1753886,0.02966005,0.62378496],"study_design_scores_gemma":[0.000091113914,0.000093592265,0.00022561707,0.00016662413,0.00003894666,0.00034269254,0.000034277833,0.6407719,0.001865922,0.2846524,0.071661316,0.000055605105],"about_ca_topic_score_codex":0.00295745,"about_ca_topic_score_gemma":0.001735616,"teacher_disagreement_score":0.014937961,"about_ca_system_score_codex":0.0015781583,"about_ca_system_score_gemma":0.0014721489,"threshold_uncertainty_score":0.049972475},"labels":[],"label_agreement":null},{"id":"W196070768","doi":"10.15173/esr.v13i1.470","title":"California's Soft Renewable Portfolio Standard","year":2004,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Renewable energy; Renewable portfolio standard; Portfolio; Renewable resource; Economics; Natural resource economics; Restructuring; Environmental economics; Electricity; Business; Industrial organization; Feed-in tariff; Energy policy; Engineering; Finance","score_opus":0.012428742715661155,"score_gpt":0.24199527505715532,"score_spread":0.22956653234149416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W196070768","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007859613,0.004301959,0.005013013,0.0049025193,0.0009622978,0.00022140628,0.002141804,0.0011260045,0.97347134],"genre_scores_gemma":[0.15263188,0.009335354,0.022632726,0.008585164,0.0007656753,0.00058672304,0.0059988573,0.00046311738,0.7990003],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99786454,0.0001229436,0.000107157764,0.00017628199,0.001620035,0.00010906346],"domain_scores_gemma":[0.9983569,0.0002020513,0.00013064039,0.00024910228,0.000931075,0.00013020555],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015611189,0.00035815945,0.00031500205,0.0017533688,0.0012030109,0.0028417907,0.0011253576,0.0015093273,0.031399596],"category_scores_gemma":[0.0025338107,0.0002624289,0.00036838677,0.001199721,0.0005814415,0.0008220961,0.0010502662,0.001199794,0.0077521876],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009440021,0.00014777377,0.001610755,0.0005980809,0.00002249724,0.00019204365,0.00016288277,0.0019522188,0.001662061,0.13774237,0.58878875,0.26702616],"study_design_scores_gemma":[0.000025425874,0.00003272075,0.0031584552,0.00016862252,0.000010187963,0.00009637417,0.000033470613,0.00026212033,0.00055241946,0.0049810745,0.99066275,0.000016447048],"about_ca_topic_score_codex":0.038969524,"about_ca_topic_score_gemma":0.08345567,"teacher_disagreement_score":0.038969524,"about_ca_system_score_codex":0.002113182,"about_ca_system_score_gemma":0.0049954797,"threshold_uncertainty_score":0.10504216},"labels":[],"label_agreement":null},{"id":"W1966350762","doi":"10.1016/j.tej.2014.04.010","title":"Notes from a Small Market: The Energy-only Market in Alberta","year":2014,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Market power; Variety (cybernetics); Investment (military); Factor market; Market microstructure; Industrial organization; Nonmarket forces; Market analysis; Economics; Business; Market share analysis; Market rate; Market economy; Order (exchange); Marketing; Finance; Computer science; Politics; Monopoly; Political science","score_opus":0.00459220662865685,"score_gpt":0.16813772956155898,"score_spread":0.16354552293290214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1966350762","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2469497,0.012161361,0.0021923375,0.1964377,0.0018889194,0.000049838207,0.0021351194,0.000108511704,0.53807646],"genre_scores_gemma":[0.85009956,0.005381432,0.0004021194,0.006459098,0.00057829695,0.000009000636,0.0004253717,0.000052809202,0.13659224],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9996873,0.000022937282,0.0000065480067,0.000041333402,0.00012131207,0.0001205348],"domain_scores_gemma":[0.99914217,0.00026515446,0.000066059976,0.000027321326,0.0002464768,0.00025284887],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004433089,0.00027709734,0.00041974173,0.00049759774,0.003332593,0.0050965413,0.0009273779,0.0017374461,0.015339198],"category_scores_gemma":[0.001539441,0.00015183193,0.00028164042,0.0012875202,0.002439204,0.0023946227,0.0009589873,0.0029561778,0.0005287187],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041292416,0.0001351245,0.009514053,0.0001600567,0.000052199375,0.0020506317,0.0032775751,0.005971245,0.0008092338,0.56384504,0.37476844,0.03900354],"study_design_scores_gemma":[0.0001579621,0.00009955346,0.042662453,0.0002609663,0.00009235613,0.00035934272,0.025477665,0.009542393,0.0013349813,0.19755875,0.7222467,0.00020683448],"about_ca_topic_score_codex":0.8609018,"about_ca_topic_score_gemma":0.93685174,"teacher_disagreement_score":0.13909823,"about_ca_system_score_codex":0.0124013685,"about_ca_system_score_gemma":0.011883877,"threshold_uncertainty_score":0.27983475},"labels":[],"label_agreement":null},{"id":"W1966716856","doi":"10.1109/tpwrs.2012.2194517","title":"An Optimal Power Flow Algorithm to Achieve Robust Operation Considering Load and Renewable Generation Uncertainties","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":110,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Renewable energy; Probabilistic logic; Mathematical optimization; Electric power system; Generator (circuit theory); Electricity generation; Computer science; Power (physics); Power flow; Economic dispatch; Taguchi methods; Control theory (sociology); Reliability engineering; Engineering; Mathematics","score_opus":0.015279905275534439,"score_gpt":0.2163551612215254,"score_spread":0.20107525594599096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1966716856","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0021571964,0.000018247705,0.997033,0.000026358466,0.000008124373,0.000019793328,0.0000057678603,0.00010141226,0.00063002994],"genre_scores_gemma":[0.24155378,0.00007499665,0.75653094,0.00006405646,0.00003440241,0.00024129185,0.000079593294,0.000088202374,0.0013326884],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99964213,0.0001130967,0.000022391043,0.000064476524,0.00011519455,0.00004269766],"domain_scores_gemma":[0.99936885,0.0003808819,0.00007114823,0.000032222422,0.0001333485,0.000013621211],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010896433,0.0008480775,0.00075935246,0.000734568,0.00043563638,0.0006252004,0.0005957278,0.00072638056,0.0020560317],"category_scores_gemma":[0.0028634204,0.00047525865,0.0004912241,0.000511282,0.0005720549,0.00097259635,0.000510192,0.0009825745,0.0003149759],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037292113,0.000032683507,0.00014504111,0.000026136033,0.000013066391,0.000024608511,0.000033084256,0.89784616,0.0018302122,0.009077757,0.00051624666,0.090417735],"study_design_scores_gemma":[0.0000065005215,0.0000141921755,0.000017946837,0.0000020065959,0.0000015500758,0.0000057144225,0.0000017081401,0.99767023,0.00036432798,0.0016976184,0.00021593533,0.00000230517],"about_ca_topic_score_codex":0.0029073614,"about_ca_topic_score_gemma":0.0018414494,"teacher_disagreement_score":0.0029073614,"about_ca_system_score_codex":0.00047093685,"about_ca_system_score_gemma":0.0011223429,"threshold_uncertainty_score":0.0068781376},"labels":[],"label_agreement":null},{"id":"W1966990634","doi":"10.1016/j.enpol.2010.03.004","title":"The large-scale integration of wind generation: Impacts on price, reliability and dispatchable conventional suppliers","year":2010,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Dispatchable generation; Wind power; Electricity market; Electricity; Electricity generation; Residual; Reliability (semiconductor); Reliability engineering; Economics; Renewable energy; Distributed generation; Engineering; Power (physics); Computer science; Electrical engineering","score_opus":0.0039944788791157785,"score_gpt":0.2137128345674377,"score_spread":0.20971835568832192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1966990634","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9747788,0.00039725722,0.012510355,0.0015740982,0.00009453881,0.000042892116,0.00036832466,0.00011422364,0.010119457],"genre_scores_gemma":[0.9982482,0.00008509203,0.00052402564,0.00004742435,0.000015968615,0.000006798011,0.0000719903,0.000014626861,0.0009857633],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993864,0.0002524687,0.000033933044,0.00010289902,0.00012489028,0.000099384604],"domain_scores_gemma":[0.9941402,0.003801891,0.0009581275,0.0002078814,0.0005907533,0.00030100468],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022161386,0.0006904385,0.00078794966,0.00040811687,0.00051734666,0.0027196528,0.00080284633,0.0014416827,0.004084924],"category_scores_gemma":[0.009171308,0.00100667,0.00058389397,0.0009059009,0.0009298358,0.0031243167,0.00070683047,0.0019385038,0.00036984446],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015883023,0.0005083347,0.018387176,0.000109414534,0.00021508428,0.0008610685,0.00006798875,0.9364143,0.00792314,0.018476944,0.0018208509,0.013627469],"study_design_scores_gemma":[0.0005937695,0.0017607823,0.08849634,0.000057749243,0.0004334292,0.00038756907,0.00091641454,0.8553055,0.007935454,0.0405798,0.0034042497,0.00012894983],"about_ca_topic_score_codex":0.0069844318,"about_ca_topic_score_gemma":0.013139975,"teacher_disagreement_score":0.0069844318,"about_ca_system_score_codex":0.0020532238,"about_ca_system_score_gemma":0.0012913573,"threshold_uncertainty_score":0.014897287},"labels":[],"label_agreement":null},{"id":"W1967209296","doi":"10.1109/pes.2010.5588070","title":"A mixed integer nonlinear program for electric generation expansion with energy and capacity pricing","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Profit (economics); Electricity; Mathematical optimization; Incentive; Integer (computer science); Commodity; Linear programming; Computer science; Incentive compatibility; Nonlinear programming; Integer programming; Nonlinear system; Microeconomics; Economics; Operations research; Mathematics; Engineering; Electrical engineering; Finance","score_opus":0.009751282308505103,"score_gpt":0.19492325666938395,"score_spread":0.18517197436087884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1967209296","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008706417,0.0001487856,0.97434014,0.00046923922,0.000045011166,0.00011630147,0.00017178492,0.00008989,0.015912415],"genre_scores_gemma":[0.43223438,0.0005242519,0.53317165,0.0002897648,0.00011344545,0.0012275032,0.00036376293,0.00014936746,0.031925872],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993445,0.0003202715,0.000017370143,0.00010227709,0.00015408146,0.00006146714],"domain_scores_gemma":[0.9993088,0.00048607777,0.00005691283,0.000024288942,0.00008942961,0.00003437552],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017956389,0.0010227535,0.00079138414,0.0004634711,0.00040243575,0.0012364349,0.0012464687,0.0013921892,0.0072783343],"category_scores_gemma":[0.0025247675,0.0005563325,0.00065240974,0.00064619316,0.00097309024,0.0013384784,0.0011253699,0.0014413252,0.00062951224],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036810325,0.000065094064,0.00013855475,0.0000801826,0.0000140556585,0.00006888114,0.000050502338,0.8775637,0.00060777366,0.10831407,0.0014234608,0.011636865],"study_design_scores_gemma":[0.0000148760755,0.000023020948,0.000034427874,0.0000072382277,0.000003968507,0.000010853956,0.0000087218805,0.98376423,0.00014114472,0.014342693,0.0016439745,0.000004813135],"about_ca_topic_score_codex":0.0033779284,"about_ca_topic_score_gemma":0.0040490907,"teacher_disagreement_score":0.0072783343,"about_ca_system_score_codex":0.0016051206,"about_ca_system_score_gemma":0.0019438742,"threshold_uncertainty_score":0.024348438},"labels":[],"label_agreement":null},{"id":"W1967496564","doi":"10.1002/nav.20185","title":"Stochastic programming models for replication of electricity forward contracts for industry","year":2006,"lang":"en","type":"article","venue":"Naval Research Logistics (NRL)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; University of New Brunswick","funders":"","keywords":"Forward contract; Spot market; Spot contract; Arbitrage; Procurement; Electricity; Stochastic programming; Electricity market; Economics; Forward price; Database transaction; Microeconomics; Forward market; Computer science; Operations research; Industrial organization; Mathematical optimization; Futures contract; Financial economics","score_opus":0.08350826714057481,"score_gpt":0.35848784185826027,"score_spread":0.27497957471768547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1967496564","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08057325,0.0012919892,0.8925607,0.0024895244,0.00014421849,0.00019615922,0.0007115251,0.00035608705,0.021676542],"genre_scores_gemma":[0.9029572,0.0011312126,0.060805127,0.00030801288,0.00014178763,0.0005646507,0.0006684901,0.00019296067,0.03323056],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978155,0.0012060027,0.00008535955,0.0003037912,0.00028604074,0.0003032048],"domain_scores_gemma":[0.98941505,0.00804397,0.0010954054,0.00033621932,0.00068340625,0.00042599742],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052483827,0.0015264577,0.0019261874,0.0010130405,0.0008018532,0.002736614,0.0023706644,0.0031196123,0.01087134],"category_scores_gemma":[0.017387083,0.0013603288,0.0017029324,0.0012808223,0.0018435279,0.0028458852,0.0015549769,0.0034631372,0.0009224144],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028455564,0.000019929683,0.00020901584,0.00001850952,0.000014742377,0.000047679925,0.000030056699,0.92558926,0.00009478379,0.07162033,0.00067634904,0.0016508917],"study_design_scores_gemma":[0.000009668148,0.000009837609,0.00004131653,0.0000042815573,0.000003404673,0.000006327418,0.000009173945,0.97108644,0.00002088523,0.028437657,0.0003654751,0.0000054708084],"about_ca_topic_score_codex":0.016675716,"about_ca_topic_score_gemma":0.009062931,"teacher_disagreement_score":0.016675716,"about_ca_system_score_codex":0.0039779865,"about_ca_system_score_gemma":0.0019209991,"threshold_uncertainty_score":0.03636831},"labels":[],"label_agreement":null},{"id":"W1968260225","doi":"10.5547/issn0195-6574-ej-vol32-no4-9","title":"A Dynamic Oligopolistic Electricity Market with Interdependent Market Segments","year":2011,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"HEC Montréal","funders":"","keywords":"Oligopoly; Economics; Interdependence; Microeconomics; Electricity market; Cournot competition; Investment (military); Production (economics); Duopoly; Nash equilibrium; Market power; Time horizon; Market structure; Electricity; Industrial organization; Finance","score_opus":0.005384120405039433,"score_gpt":0.1745193866999735,"score_spread":0.16913526629493406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968260225","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4700168,0.00085268513,0.46832415,0.0026459403,0.00012986429,0.0002727341,0.0030715875,0.0003597255,0.054326497],"genre_scores_gemma":[0.97076684,0.0003844168,0.016283669,0.00009244702,0.000032149368,0.0001476785,0.00031066843,0.00002586321,0.011956309],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935645,0.00026643096,0.000019505995,0.00015071177,0.000087525994,0.00011928786],"domain_scores_gemma":[0.99896765,0.00047576058,0.00024437657,0.00005685055,0.000110312925,0.00014508411],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007344581,0.0007652821,0.0012482443,0.0006207366,0.0008217726,0.0025957292,0.0022109791,0.002125478,0.004480947],"category_scores_gemma":[0.0018404444,0.0009799625,0.0007371005,0.0011256336,0.0018592009,0.0018188406,0.0008959114,0.0013169666,0.00042248913],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006043091,0.00004369681,0.0006601906,0.000026369156,0.000032201333,0.00014333386,0.000041774558,0.95668364,0.0005647063,0.040449966,0.00033275358,0.00096087763],"study_design_scores_gemma":[0.000045479534,0.000023395301,0.0002484703,0.0000035889286,0.000012782504,0.000016635937,0.000018433417,0.99386865,0.000050403367,0.0052251406,0.0004758582,0.0000112521],"about_ca_topic_score_codex":0.03942732,"about_ca_topic_score_gemma":0.03236839,"teacher_disagreement_score":0.03942732,"about_ca_system_score_codex":0.0034188014,"about_ca_system_score_gemma":0.002326796,"threshold_uncertainty_score":0.078395665},"labels":[],"label_agreement":null},{"id":"W1968768025","doi":"10.1260/095830506779398920","title":"Prospects of Renewable Energy Development in the European Electricity Sector: Results of the Simulation Tool Green-X","year":2006,"lang":"en","type":"article","venue":"Energy & Environment","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"European Commission","keywords":"Renewable energy; Environmental economics; Electricity; Quarter (Canadian coin); Cost reduction; Business; Computer science; Operations research; Economics; Engineering","score_opus":0.004697179475142777,"score_gpt":0.15176792073845494,"score_spread":0.14707074126331215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968768025","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9822107,0.00032770712,0.0050570834,0.00028618937,0.000033711363,0.00003240451,0.0010278155,0.0002944765,0.010729917],"genre_scores_gemma":[0.99595815,0.00014822347,0.0021041406,0.00003727427,0.0000038389667,0.000024580791,0.0007566678,0.00005201898,0.00091502554],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995043,0.00028412734,0.00002162338,0.00004424432,0.00007595376,0.00006986186],"domain_scores_gemma":[0.9976272,0.0017854733,0.00011719737,0.00014087727,0.00023791468,0.00009139439],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015642599,0.00071438873,0.0007709526,0.0005529491,0.00033609878,0.00096988777,0.0005344437,0.0011306335,0.0018638693],"category_scores_gemma":[0.0031859027,0.00030523658,0.00078295515,0.0012777798,0.0006207577,0.0008270162,0.0004517449,0.00078103965,0.00025331523],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014127017,0.00007328014,0.0037331588,0.0000326599,0.000024440356,0.000058923706,0.00002638417,0.99171406,0.00034363026,0.0011271378,0.0004117019,0.0023133643],"study_design_scores_gemma":[0.00009386467,0.00016070784,0.0025217782,0.000010806731,0.000018089671,0.00002083479,0.00009216186,0.9938141,0.001205267,0.0012809791,0.00076381414,0.000017581902],"about_ca_topic_score_codex":0.01869342,"about_ca_topic_score_gemma":0.011995414,"teacher_disagreement_score":0.01869342,"about_ca_system_score_codex":0.00089301076,"about_ca_system_score_gemma":0.0006027044,"threshold_uncertainty_score":0.037169218},"labels":[],"label_agreement":null},{"id":"W1969291827","doi":"10.1111/j.1541-0064.2007.00194_1.x","title":"Electric Choices: Deregulation and the Future of Electric Power edited by Andrew N.Kleit, Rowman &amp; Littlefield Publishers Inc., in cooperation with The Independent Institute, Lanham and Oakland, 2007, x + 242 pages, cloth US$ 80.00 (ISBN 0‐7425‐4875‐9), paper US$ 29.95 (ISBN 0‐7425‐4875‐7)","year":2007,"lang":"en","type":"article","venue":"Canadian Geographies / Géographies canadiennes","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Deregulation; Citation; Power (physics); Political science; Management; Operations research; Library science; Law; Engineering; Computer science; Economics; Physics; Market economy","score_opus":0.0027039698133368606,"score_gpt":0.1580049908651426,"score_spread":0.15530102105180574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1969291827","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023071147,0.8191736,0.004803996,0.039033044,0.003946555,0.000014661361,0.00043691395,0.00010331293,0.1301808],"genre_scores_gemma":[0.052343182,0.81069744,0.0030105277,0.0028481272,0.0015890592,0.000024124953,0.0003650722,0.000098740966,0.1290238],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999814,0.000051736562,0.0000057255597,0.000029242256,0.00007281386,0.000026489497],"domain_scores_gemma":[0.99988306,0.00003880401,0.000014864087,0.0000071662425,0.000035664605,0.000020452062],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039265724,0.0011592055,0.0005433557,0.0006016097,0.00043794807,0.0028474065,0.00046468896,0.00085251796,0.012923379],"category_scores_gemma":[0.00060946203,0.00044483555,0.00025132622,0.0024759609,0.0013276302,0.0031002671,0.0008108345,0.0015334849,0.0026321283],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000404235,0.000026795056,0.0003088388,0.0004957963,0.000030652995,0.00008468908,0.0003433655,0.004020831,0.00031794244,0.15984604,0.69100994,0.14347471],"study_design_scores_gemma":[0.0000069955436,0.000010052795,0.0009727673,0.00057862373,0.000010712816,0.00008725158,0.00038286587,0.00078913994,0.00015425435,0.09034373,0.9066512,0.00001247828],"about_ca_topic_score_codex":0.016058099,"about_ca_topic_score_gemma":0.04634104,"teacher_disagreement_score":0.016058099,"about_ca_system_score_codex":0.0031862478,"about_ca_system_score_gemma":0.0038711464,"threshold_uncertainty_score":0.043233037},"labels":[],"label_agreement":null},{"id":"W1971280324","doi":"10.1049/ip-gtd:20050438","title":"Locational balance service auction market for transmission congestion management","year":2006,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Congestion management; Procurement; Balance (ability); Business; Electricity market; Energy market; Transmission (telecommunications); Service (business); Common value auction; Industrial organization; Consumption (sociology); Microeconomics; Electricity; Computer science; Telecommunications; Marketing; Economics; Engineering; Electric power system","score_opus":0.006262264168592076,"score_gpt":0.19015822372364508,"score_spread":0.183895959555053,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1971280324","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032398373,0.00026380524,0.9495017,0.00038425595,0.00015148584,0.00024660816,0.00006493131,0.00020757025,0.016781282],"genre_scores_gemma":[0.89430207,0.00024732415,0.090697765,0.00013524524,0.00012993155,0.00024397808,0.00006285759,0.000037951504,0.0141429035],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987437,0.00062106166,0.0000309283,0.00012793312,0.00031837623,0.00015797603],"domain_scores_gemma":[0.99928766,0.0002500005,0.00009740866,0.00006841188,0.00016796104,0.00012850329],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018654588,0.00055214466,0.0009930037,0.0003349699,0.00053294405,0.0017727265,0.0016609707,0.0010635671,0.0052652657],"category_scores_gemma":[0.002151679,0.0003668925,0.0005895959,0.00042292514,0.0012108467,0.0026331,0.0010747188,0.0010204784,0.00055065175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044734665,0.000488228,0.0004847502,0.0002176086,0.000087934066,0.0005629098,0.00011148915,0.43471116,0.011018219,0.50778025,0.0055155694,0.038574506],"study_design_scores_gemma":[0.0001595891,0.00024788317,0.00013403996,0.000006396147,0.000021298092,0.00014023417,0.000015324838,0.96333486,0.00088151364,0.031147461,0.0038837143,0.000027712225],"about_ca_topic_score_codex":0.0009011959,"about_ca_topic_score_gemma":0.0012069921,"teacher_disagreement_score":0.0052652657,"about_ca_system_score_codex":0.0014773315,"about_ca_system_score_gemma":0.0016662475,"threshold_uncertainty_score":0.017614067},"labels":[],"label_agreement":null},{"id":"W1972164570","doi":"10.1049/iet-gtd:20060529","title":"Unit commitment – a fuzzy mixed integer Linear Programming solution","year":2007,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Integer programming; Fuzzy logic; Linear programming; Power system simulation; Robustness (evolution); Computer science; Generator (circuit theory); Flexibility (engineering); Mathematics; Electric power system; Artificial intelligence","score_opus":0.019399948718939592,"score_gpt":0.2450410507496445,"score_spread":0.2256411020307049,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1972164570","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0066620274,0.00014449185,0.9810209,0.0002790681,0.000042045198,0.00006836909,0.00008240611,0.00020309337,0.011497506],"genre_scores_gemma":[0.39758295,0.00027094374,0.5872701,0.0001797483,0.00006671499,0.00033919347,0.00017167577,0.000112231595,0.014006466],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952364,0.00018784689,0.0000169839,0.00007593385,0.00015166328,0.00004386913],"domain_scores_gemma":[0.99973387,0.00014852043,0.000026156278,0.000016255708,0.00006066068,0.000014557716],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008058305,0.00064789696,0.0007646621,0.00041676438,0.0005015009,0.0012137122,0.0011500742,0.0013537658,0.0053230003],"category_scores_gemma":[0.0012974797,0.00043536568,0.0005973303,0.0007230875,0.00045811394,0.00063487893,0.0007090745,0.0011823919,0.000654535],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003233792,0.00002346257,0.000097631855,0.000045762055,0.000019251454,0.00006018643,0.000029353396,0.9502978,0.0008863675,0.017930955,0.0013488425,0.029228115],"study_design_scores_gemma":[0.0000059791205,0.000009696115,0.000013123486,0.0000036545657,0.0000021575165,0.0000066227785,0.0000057418115,0.99682355,0.00016981749,0.002364858,0.0005927617,0.0000020869848],"about_ca_topic_score_codex":0.006233019,"about_ca_topic_score_gemma":0.004504091,"teacher_disagreement_score":0.006233019,"about_ca_system_score_codex":0.0005739568,"about_ca_system_score_gemma":0.0012989629,"threshold_uncertainty_score":0.017807186},"labels":[],"label_agreement":null},{"id":"W1972720661","doi":"10.1109/tenconspring.2013.6584478","title":"Single buyer - A step forward in Malaysian Electricity Supply Industry reform","year":2013,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Ministère de l'Économie, de la Science et de l'Innovation - Québec","keywords":"Operationalization; Transparency (behavior); Relevance (law); Accountability; Electricity; Context (archaeology); Business; Industrial organization; Key (lock); Process management; Computer science; Computer security; Engineering","score_opus":0.005691594294937185,"score_gpt":0.18295455521360188,"score_spread":0.1772629609186647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1972720661","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3508067,0.04305589,0.06602728,0.23487185,0.0020382197,0.0002834117,0.00017824811,0.00015780624,0.30258057],"genre_scores_gemma":[0.95680654,0.005820296,0.007865886,0.0066657066,0.0003278989,0.000046937177,0.00003252158,0.000029966595,0.022404155],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9943376,0.0026995635,0.0002994092,0.0007889943,0.0011945821,0.0006798233],"domain_scores_gemma":[0.9948484,0.0022334794,0.00091052643,0.0005728752,0.0009350213,0.0004997809],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010690348,0.00024938822,0.0004057749,0.00079084845,0.0023218775,0.007726986,0.0014197052,0.0039181663,0.0037122949],"category_scores_gemma":[0.009054844,0.000478836,0.00039785847,0.0011497315,0.009168929,0.010293794,0.003982781,0.0066436613,0.0005077498],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023528984,0.00002282124,0.001007757,0.000100008525,0.0000045973397,0.00019854523,0.0017530816,0.0009525473,0.00013393906,0.9676527,0.0021392903,0.026011301],"study_design_scores_gemma":[0.00005600387,0.0004391983,0.009806828,0.0014169412,0.000023041815,0.0013941716,0.00868573,0.008842596,0.0028678493,0.42546082,0.54085654,0.00015042226],"about_ca_topic_score_codex":0.0075623607,"about_ca_topic_score_gemma":0.008583461,"teacher_disagreement_score":0.01089232,"about_ca_system_score_codex":0.01089232,"about_ca_system_score_gemma":0.01105595,"threshold_uncertainty_score":0.07902968},"labels":[],"label_agreement":null},{"id":"W1973140758","doi":"10.1016/s0005-1098(01)00225-4","title":"A decomposition approach for the solution of the unit loading problem in hydroplants","year":2002,"lang":"en","type":"article","venue":"Automatica","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Decomposition; Mathematical optimization; Unit (ring theory); Decomposition method (queueing theory); Computer science; Dynamic programming; Mathematics","score_opus":0.015391325571477476,"score_gpt":0.21347009335455436,"score_spread":0.19807876778307687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1973140758","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030723945,0.00019971699,0.99455404,0.00010532298,0.000041046012,0.000023967968,0.000046042183,0.00005148107,0.0019060846],"genre_scores_gemma":[0.12782423,0.0008282554,0.86626977,0.00013393446,0.00009637714,0.00029869162,0.00024133713,0.00019710818,0.0041102483],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969304,0.00014059662,0.000013577713,0.000029924759,0.00007981496,0.000043081214],"domain_scores_gemma":[0.9995092,0.0003092293,0.00002897151,0.000031709715,0.00008776575,0.000033108125],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00084809976,0.0010149847,0.00096911605,0.00066752534,0.0004990251,0.00087823195,0.00089425256,0.0011172242,0.00386705],"category_scores_gemma":[0.00192191,0.0006075317,0.0012896347,0.00086254824,0.00061048643,0.00085124874,0.0011851444,0.0017079869,0.0008325712],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006570054,0.000085493506,0.00021449223,0.00019028349,0.000052642656,0.00009630342,0.0000718921,0.860903,0.003227721,0.053150717,0.004116726,0.07782496],"study_design_scores_gemma":[0.000012520202,0.000014869924,0.00004143716,0.000015280704,0.0000066649836,0.000012895677,0.000013566543,0.979334,0.000263674,0.01909536,0.0011845205,0.000005094994],"about_ca_topic_score_codex":0.0039272457,"about_ca_topic_score_gemma":0.004538983,"teacher_disagreement_score":0.0039272457,"about_ca_system_score_codex":0.0004409323,"about_ca_system_score_gemma":0.00108326,"threshold_uncertainty_score":0.012936592},"labels":[],"label_agreement":null},{"id":"W1975330706","doi":"10.1049/iet-gtd.2009.0148","title":"Emission allowances auction for an oligopolistic electricity market operating under cap-and-trade","year":2010,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"McGill University","keywords":"Allowance (engineering); Oligopoly; Cournot competition; Economics; Electricity market; Nash equilibrium; Electricity; Microeconomics; Economic surplus; Emissions trading; Greenhouse gas; Welfare; Market economy; Operations management; Engineering","score_opus":0.012471985184876374,"score_gpt":0.24061284605550398,"score_spread":0.2281408608706276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1975330706","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31124404,0.0011132513,0.5852889,0.001342358,0.000252902,0.00039697968,0.00049411046,0.00019562016,0.09967184],"genre_scores_gemma":[0.9587435,0.00037531162,0.026430886,0.000092021895,0.000058957394,0.00010186225,0.000091451475,0.000038924147,0.014067029],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902356,0.0004900937,0.000032319822,0.00012013413,0.00013303496,0.00020087374],"domain_scores_gemma":[0.9989825,0.00053674786,0.00017489631,0.00007244064,0.00008984724,0.00014361905],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001586024,0.00094550283,0.0014333179,0.00047931576,0.00080649473,0.0029438722,0.0015587081,0.0016695117,0.0060997847],"category_scores_gemma":[0.0025330503,0.00063774385,0.0015133887,0.00067529076,0.0014284961,0.0024937678,0.0013219814,0.0013978201,0.0004318984],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025428637,0.00020704608,0.0005799147,0.000106741245,0.00009702148,0.000498239,0.000090389396,0.80219847,0.0012495936,0.1884057,0.0011167781,0.0051958216],"study_design_scores_gemma":[0.00007311735,0.0001208674,0.00028517473,0.000013639025,0.00003388079,0.00009425433,0.00006843945,0.95909715,0.00021557837,0.03847409,0.0015003537,0.000023439528],"about_ca_topic_score_codex":0.006006086,"about_ca_topic_score_gemma":0.0063015274,"teacher_disagreement_score":0.0060997847,"about_ca_system_score_codex":0.0021358237,"about_ca_system_score_gemma":0.0020105564,"threshold_uncertainty_score":0.020405829},"labels":[],"label_agreement":null},{"id":"W1976223977","doi":"10.2316/journal.203.2007.4.203-3636","title":"LAGRANGIAN RELAXATION-BASED PARTICLE SWARM OPTIMIZATION FOR UNIT COMMITMENT PROBLEM","year":2007,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Lagrangian relaxation; Particle swarm optimization; Mathematical optimization; Relaxation (psychology); Convergence (economics); Lagrangian; Limit (mathematics); Power system simulation; Computer science; Economic dispatch; Mathematics; Applied mathematics; Physics","score_opus":0.007849771026057564,"score_gpt":0.2251284250195706,"score_spread":0.21727865399351304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1976223977","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0036036125,0.000431825,0.9925074,0.0001625705,0.000044798096,0.000037763333,0.000022113962,0.00009151439,0.0030984897],"genre_scores_gemma":[0.4094283,0.0015813415,0.5819487,0.00020009684,0.00019848665,0.00044081907,0.00025959432,0.00012352558,0.0058191335],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994398,0.00031203622,0.000018775798,0.000046704954,0.00014846273,0.00003419485],"domain_scores_gemma":[0.9995827,0.00026443787,0.000047265094,0.000023176879,0.00006604966,0.000016373791],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012356655,0.0007889911,0.0010421452,0.00041811613,0.00033967334,0.0006970539,0.0008707469,0.00087380427,0.0018343681],"category_scores_gemma":[0.0018449594,0.00036572965,0.0005779928,0.0007538361,0.00045371932,0.0006792762,0.0005731311,0.0013413964,0.0004857451],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004748496,0.00004038064,0.00017709153,0.00017869115,0.000036669084,0.00007298488,0.00004225354,0.9357362,0.0014881623,0.01806289,0.0020861875,0.042031],"study_design_scores_gemma":[0.000011390979,0.000018378858,0.000027576043,0.000005824277,0.00000381602,0.000011739842,0.0000037474151,0.99722844,0.00020820167,0.0016870135,0.0007910448,0.000002813089],"about_ca_topic_score_codex":0.0024115785,"about_ca_topic_score_gemma":0.0013076077,"teacher_disagreement_score":0.0024115785,"about_ca_system_score_codex":0.00045353363,"about_ca_system_score_gemma":0.0008339591,"threshold_uncertainty_score":0.0065348744},"labels":[],"label_agreement":null},{"id":"W1976455025","doi":"10.1049/iet-gtd.2010.0109","title":"Dynamic adaptive bacterial foraging algorithm for optimum economic dispatch with valve-point effects and wind power","year":2010,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":92,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Mathematical optimization; Foraging; Economic dispatch; Convergence (economics); Computer science; Wind power; Power (physics); Point (geometry); Electric power system; Mathematics; Engineering","score_opus":0.003183709972350708,"score_gpt":0.19202900197263253,"score_spread":0.18884529200028183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1976455025","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012034916,0.0003854576,0.9844099,0.00012471263,0.000055522964,0.000041126492,0.000019750047,0.00016186597,0.0027667957],"genre_scores_gemma":[0.45078418,0.0005338545,0.5439032,0.0001106292,0.00006270527,0.0003734505,0.00012239664,0.00009647198,0.0040131947],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970585,0.00012984926,0.000013176893,0.00003169231,0.00008762444,0.000031803545],"domain_scores_gemma":[0.99974984,0.0001466605,0.00002649462,0.000011609664,0.000050047704,0.000015314821],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007801388,0.0007862838,0.0010331189,0.00052361295,0.00038843014,0.0005384432,0.0008030763,0.0009225884,0.0012997518],"category_scores_gemma":[0.0013822813,0.00032663782,0.00053339585,0.0005688794,0.00037538796,0.0005401004,0.000492321,0.00069187867,0.0002871934],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045915393,0.000023838476,0.00021881457,0.000039168706,0.00003438392,0.000045093057,0.00003827009,0.9524314,0.0013760542,0.0062569994,0.0006597679,0.03883035],"study_design_scores_gemma":[0.000013024391,0.00001335061,0.000038763388,0.0000029347652,0.000002992075,0.000007758203,0.0000028421566,0.998126,0.00010992113,0.0011559607,0.00052357337,0.000002860353],"about_ca_topic_score_codex":0.0034383538,"about_ca_topic_score_gemma":0.0023241187,"teacher_disagreement_score":0.0034383538,"about_ca_system_score_codex":0.0005139741,"about_ca_system_score_gemma":0.00088827626,"threshold_uncertainty_score":0.0068366528},"labels":[],"label_agreement":null},{"id":"W1976765048","doi":"10.1049/iet-gtd.2009.0099","title":"Re-defining the reactive power dispatch problem in the context of competitive electricity markets","year":2010,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Independent Electricity System Operator; University of Waterloo","funders":"","keywords":"AC power; Electricity market; Context (archaeology); Benchmark (surveying); Electricity; Electric power system; Computer science; Economic dispatch; Schedule; Electricity generation; Power (physics); Mathematical optimization; Reliability engineering; Voltage; Engineering; Electrical engineering; Mathematics","score_opus":0.0054075115036152765,"score_gpt":0.2083517637847045,"score_spread":0.20294425228108923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1976765048","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01583302,0.00023524695,0.9760741,0.0005226648,0.000091145535,0.000036605667,0.00007723781,0.000047933445,0.0070820544],"genre_scores_gemma":[0.85001606,0.00077853835,0.1409751,0.00022671152,0.00027812744,0.00014697439,0.000133629,0.00013307184,0.007311777],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99907506,0.0005511386,0.00002825035,0.000107693806,0.00016478213,0.00007307094],"domain_scores_gemma":[0.9992725,0.0004590653,0.00009594157,0.00003350324,0.00009679129,0.000042120413],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015366912,0.0009818812,0.0010846152,0.00029662828,0.00041772795,0.0017979051,0.0015121606,0.0014383319,0.0015106178],"category_scores_gemma":[0.0026627951,0.00044497976,0.0006536978,0.00052015076,0.00089494686,0.0023668264,0.00088190066,0.0016299854,0.00026152696],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016274887,0.000012449671,0.00010841448,0.000027441632,0.000008671012,0.00007278674,0.00003103903,0.9297758,0.00028045347,0.064911254,0.0005361164,0.004219427],"study_design_scores_gemma":[0.000004124379,0.000007487483,0.000020386464,0.0000025048898,0.0000018731993,0.000008845267,0.000012918224,0.98947453,0.000048107286,0.009995381,0.00042107294,0.000002720983],"about_ca_topic_score_codex":0.0070142,"about_ca_topic_score_gemma":0.0065535023,"teacher_disagreement_score":0.0070142,"about_ca_system_score_codex":0.001074229,"about_ca_system_score_gemma":0.0015573597,"threshold_uncertainty_score":0.013946772},"labels":[],"label_agreement":null},{"id":"W1977381041","doi":"10.1016/j.tej.2012.03.003","title":"Assessing the Economic Value of Transmission in Alberta's Restructured Electricity Market","year":2012,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity market; Economic shortage; Electricity; Clearing; Transmission (telecommunications); Electricity retailing; Business; Economics; Natural resource economics; Environmental economics; Industrial organization; Engineering; Finance; Telecommunications","score_opus":0.00649132535944546,"score_gpt":0.23130224588412063,"score_spread":0.22481092052467516,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1977381041","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9930837,0.00008088763,0.0003577587,0.00022490011,0.000008465693,0.000015376947,0.00022518211,0.000014187132,0.0059894887],"genre_scores_gemma":[0.99826235,0.000056600533,0.00021544928,0.000015690728,0.0000049794435,0.0000025557408,0.00020342786,0.000004181292,0.0012347688],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99955016,0.00011938486,0.000016749074,0.00003825611,0.00015456592,0.000120811936],"domain_scores_gemma":[0.9980665,0.00091309374,0.00023610545,0.00008182293,0.00045310394,0.00024953668],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001067285,0.0004017318,0.0003337659,0.001036687,0.00093821523,0.0030760362,0.0013702961,0.0011468028,0.0024426267],"category_scores_gemma":[0.0038641673,0.00029563,0.00042138709,0.0015060897,0.0011815593,0.0015343861,0.0006919516,0.0012971424,0.00010701056],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001720439,0.000545897,0.11686537,0.000069383364,0.00020261643,0.0022400876,0.00025360507,0.83607525,0.0024871,0.020281123,0.002888927,0.01637016],"study_design_scores_gemma":[0.00020915015,0.00042709784,0.1294096,0.00003376526,0.00018224801,0.00015314802,0.0024665224,0.8550173,0.001973485,0.006420612,0.003597984,0.00010901723],"about_ca_topic_score_codex":0.70894015,"about_ca_topic_score_gemma":0.83043027,"teacher_disagreement_score":0.29105985,"about_ca_system_score_codex":0.013397451,"about_ca_system_score_gemma":0.0052015455,"threshold_uncertainty_score":0.5855479},"labels":[],"label_agreement":null},{"id":"W1978096359","doi":"10.1109/ccece.2014.6901155","title":"A probabilistic approach to assess wind generation penetration and market prices","year":2014,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada; University of Waterloo","funders":"","keywords":"Probabilistic logic; Wind power; Renewable energy; Electricity market; Electricity; Electric power system; Electricity generation; Wind speed; Penetration (warfare); Environmental economics; Computer science; Market penetration; Environmental science; Reliability engineering; Meteorology; Engineering; Electrical engineering; Power (physics); Operations research; Economics; Artificial intelligence; Geography","score_opus":0.018398320999497498,"score_gpt":0.20540566645078745,"score_spread":0.18700734545128994,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1978096359","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0039280313,0.00008567703,0.99459934,0.000045214936,0.000010354387,0.000026516787,0.00009357546,0.00011783547,0.0010935704],"genre_scores_gemma":[0.5836328,0.00081823196,0.41090107,0.000100748955,0.0001567409,0.0004311857,0.0007064243,0.0001250129,0.0031277724],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99806195,0.0008198311,0.000101005004,0.00020509269,0.00071477215,0.00009733456],"domain_scores_gemma":[0.9958121,0.0030749612,0.0004570637,0.00022426507,0.0003737715,0.000057778674],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023879623,0.0013568618,0.0008012712,0.0021655262,0.00049065694,0.0011463123,0.0012973772,0.0012227666,0.0025866427],"category_scores_gemma":[0.011405552,0.00093106227,0.0013756205,0.0017849392,0.00067346485,0.00178154,0.0010395765,0.001352074,0.0005032783],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029047513,0.000037714803,0.0013699735,0.000037070226,0.00008777849,0.00005764257,0.000019695097,0.9522517,0.0013460928,0.020423686,0.0003473137,0.02399229],"study_design_scores_gemma":[0.0000041301123,0.000034039847,0.00058282266,0.0000040990544,0.000017968505,0.000061046296,0.0000056090407,0.9864856,0.00032480602,0.011953095,0.0005093126,0.000017368717],"about_ca_topic_score_codex":0.0026944228,"about_ca_topic_score_gemma":0.0034567348,"teacher_disagreement_score":0.0026944228,"about_ca_system_score_codex":0.00047647432,"about_ca_system_score_gemma":0.0007306224,"threshold_uncertainty_score":0.012628853},"labels":[],"label_agreement":null},{"id":"W1978813851","doi":"10.1109/tste.2015.2410760","title":"Flexibility Envelopes for Power System Operational Planning","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":220,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Canadian Network for Research and Innovation in Machining Technology, Natural Sciences and Engineering Research Council of Canada","keywords":"Flexibility (engineering); Computer science; Electric power system; Power (physics); Systems engineering; Reliability engineering; Engineering","score_opus":0.017049234759853663,"score_gpt":0.23245409634055342,"score_spread":0.21540486158069977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1978813851","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014263484,0.0028293324,0.94533515,0.0009522592,0.00014800175,0.00011560878,0.0006314996,0.00034967574,0.03537499],"genre_scores_gemma":[0.85110515,0.004580643,0.120641015,0.00021269641,0.0002015483,0.00049785635,0.0011137408,0.0003404949,0.021306958],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99887115,0.00051956746,0.00006314663,0.00011378498,0.00029952772,0.00013291335],"domain_scores_gemma":[0.9972582,0.00195724,0.00023934156,0.00020057289,0.00024129583,0.00010335326],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026518346,0.0013593173,0.0010393223,0.0011905743,0.0005183188,0.0022988904,0.0009726008,0.0011016494,0.012002497],"category_scores_gemma":[0.009157453,0.00065568916,0.0012177158,0.001959769,0.0010177928,0.0020657384,0.002024733,0.002035832,0.001277562],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005133154,0.000013490933,0.0002484937,0.00009330075,0.000026658425,0.000049230173,0.000051589243,0.8404387,0.0002470921,0.122389264,0.0016400976,0.034750756],"study_design_scores_gemma":[0.0000085154115,0.000030109793,0.000177284,0.00006025328,0.000009039971,0.000018940218,0.000025559213,0.89393115,0.00013102095,0.10090503,0.0046883845,0.000014775745],"about_ca_topic_score_codex":0.0046801693,"about_ca_topic_score_gemma":0.0028686791,"teacher_disagreement_score":0.012002497,"about_ca_system_score_codex":0.0017360986,"about_ca_system_score_gemma":0.0014182059,"threshold_uncertainty_score":0.04015237},"labels":[],"label_agreement":null},{"id":"W1980789656","doi":"10.1016/j.epsr.2008.09.016","title":"Analysis of market signals in a competitive electricity market using components of network rental","year":2008,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Renting; Electricity market; Constraint (computer-aided design); Transmission network; Electricity; Transmission (telecommunications); Economic surplus; Computer science; Microeconomics; Mathematical optimization; Econometrics; Industrial organization; Business; Economics; Telecommunications; Mathematics; Engineering","score_opus":0.0390534136239483,"score_gpt":0.2898762146471059,"score_spread":0.25082280102315757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1980789656","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7677802,0.00053553726,0.20444337,0.001308552,0.00008232122,0.00012463631,0.00032285188,0.00026363612,0.025139064],"genre_scores_gemma":[0.99294865,0.00012568623,0.0036945553,0.000027690607,0.000029407538,0.000018996532,0.000054024913,0.00003467468,0.0030663104],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99946064,0.00021565914,0.00001713099,0.000068193556,0.00012073824,0.000117633215],"domain_scores_gemma":[0.99128,0.0071081184,0.00064292474,0.00017175362,0.0005319038,0.00026525444],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018536688,0.00077947567,0.0011072741,0.0009712739,0.0004639485,0.0025981364,0.0014149662,0.0014255532,0.0065885955],"category_scores_gemma":[0.013135554,0.00074036064,0.0007072072,0.00089504535,0.0012888274,0.0035705701,0.00065292977,0.0015975776,0.00030508704],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005167248,0.00015074652,0.003871764,0.00014488582,0.000085830376,0.00045201922,0.0001665734,0.71443117,0.0044557187,0.259619,0.0020393212,0.014066255],"study_design_scores_gemma":[0.00001447812,0.000032065713,0.00073177135,0.000004264019,0.000014469313,0.000020981372,0.000031894495,0.9890982,0.00025341607,0.009609001,0.00017754524,0.000011964748],"about_ca_topic_score_codex":0.00592368,"about_ca_topic_score_gemma":0.0047303825,"teacher_disagreement_score":0.0065885955,"about_ca_system_score_codex":0.001492548,"about_ca_system_score_gemma":0.0011000732,"threshold_uncertainty_score":0.022041082},"labels":[],"label_agreement":null},{"id":"W1981217786","doi":"10.3138/infor.48.4.267","title":"On European Electricity Market Liberalization: A Game-Theoretic Approach","year":2010,"lang":"en","type":"article","venue":"INFOR Information Systems and Operational Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity market; Liberalization; Electricity; Stackelberg competition; Profit (economics); Electricity retailing; Economics; Industrial organization; Perfect competition; Microeconomics; Business; Market economy; Engineering","score_opus":0.014835968698610542,"score_gpt":0.25576974717776446,"score_spread":0.24093377847915393,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981217786","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06731811,0.0039083976,0.7363822,0.0060263774,0.00027859336,0.00019028698,0.00014805664,0.00007400062,0.18567398],"genre_scores_gemma":[0.9138915,0.003318625,0.0690177,0.0008650532,0.0002483648,0.00026800577,0.000077884564,0.00004059892,0.012272213],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974865,0.0018222469,0.00005443883,0.00017270919,0.00024508938,0.00021896794],"domain_scores_gemma":[0.9982835,0.0012809016,0.00015732978,0.00007896001,0.00011605939,0.00008332987],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030754313,0.0010650058,0.0010301905,0.0009872081,0.0008818515,0.0031186591,0.0014406466,0.0027632955,0.0046122116],"category_scores_gemma":[0.005394309,0.0004179153,0.0010086102,0.0013251719,0.003161466,0.0042134766,0.0020557628,0.002210887,0.00023143673],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028974488,0.000042129173,0.00015395068,0.00005961104,0.00002598956,0.00009976023,0.000096750606,0.18229102,0.00019994836,0.8104242,0.0007303593,0.0058473307],"study_design_scores_gemma":[0.000036819274,0.000058797657,0.00021619776,0.00007571855,0.000020815016,0.000074769836,0.00018697641,0.37682742,0.0002448933,0.6149286,0.007302248,0.000026830285],"about_ca_topic_score_codex":0.0034900382,"about_ca_topic_score_gemma":0.0030462504,"teacher_disagreement_score":0.0046122116,"about_ca_system_score_codex":0.0025534069,"about_ca_system_score_gemma":0.0018396361,"threshold_uncertainty_score":0.018526316},"labels":[],"label_agreement":null},{"id":"W1981693436","doi":"10.2316/journal.203.2007.4.203-3653","title":"CONCEPTS ON MARKET-ORIENTED TRANSMISSION INVESTMENT","year":2007,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Investment (military); Business; Transmission (telecommunications); Industrial organization; Telecommunications; Computer science; Political science","score_opus":0.00396367155620569,"score_gpt":0.22378172696271686,"score_spread":0.21981805540651117,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981693436","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011335592,0.0049780235,0.67090595,0.004329711,0.00053781393,0.00022648643,0.00018177449,0.00010269886,0.30740198],"genre_scores_gemma":[0.73833954,0.00976616,0.18010259,0.0013086991,0.0014560008,0.0014877517,0.00014544638,0.00012436786,0.06726951],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99873286,0.00048753203,0.000050860075,0.00022830257,0.00036724174,0.00013317038],"domain_scores_gemma":[0.9991314,0.00045081254,0.00012374955,0.00009974823,0.00012405984,0.000070221475],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002352876,0.001155788,0.0005683849,0.0013481972,0.0010307133,0.0039272774,0.0016542367,0.002484098,0.010103947],"category_scores_gemma":[0.0030253315,0.0004231203,0.0009290587,0.0015325667,0.006040275,0.007188674,0.0017180411,0.002911889,0.0010052574],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000015046647,0.0000033655565,0.0000126673895,0.00001029876,0.0000015488257,0.000012570165,0.000020008429,0.0014711282,0.000034085086,0.9967648,0.00025045013,0.0014176841],"study_design_scores_gemma":[0.000009577833,0.000016311054,0.000040127117,0.000036535774,0.0000038185503,0.000057963913,0.00003700955,0.008437993,0.00010510864,0.97186726,0.019381251,0.0000069825965],"about_ca_topic_score_codex":0.00086235267,"about_ca_topic_score_gemma":0.0006884119,"teacher_disagreement_score":0.010103947,"about_ca_system_score_codex":0.0032273969,"about_ca_system_score_gemma":0.0011162445,"threshold_uncertainty_score":0.03380108},"labels":[],"label_agreement":null},{"id":"W1983601351","doi":"10.1109/tsg.2014.2320954","title":"A Dynamic Mechanism for Wholesale Energy Market: Stability and Robustness","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Electric Power System Optimization","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Alberta Energy","funders":"","keywords":"Robustness (evolution); Electricity market; Renewable energy; Demand response; Energy market; Dynamic pricing; Electric power system; Economics; Wind power; Power market; Stability (learning theory); Microeconomics; Computer science; Electricity; Power (physics); Engineering","score_opus":0.006194928164210443,"score_gpt":0.18578650372010067,"score_spread":0.17959157555589023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1983601351","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024841323,0.00019928362,0.9602216,0.0007043313,0.00008235233,0.00006743185,0.000107520726,0.00032556753,0.013450677],"genre_scores_gemma":[0.97259086,0.00025699803,0.021478789,0.00015448709,0.000074142314,0.00014288648,0.000074483265,0.00008382769,0.0051436503],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99915254,0.00024508795,0.000036202364,0.00019528193,0.00026133453,0.00010951378],"domain_scores_gemma":[0.998575,0.0005853589,0.00034211282,0.00024733707,0.00018802511,0.00006216817],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014478678,0.000838863,0.001067848,0.0005217387,0.00076221727,0.0021516667,0.0019952897,0.0019501983,0.0071989624],"category_scores_gemma":[0.004015019,0.00051997375,0.0012984915,0.0003713511,0.0017363911,0.0033734816,0.0017426295,0.0016411132,0.00094693765],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006712474,0.00004490077,0.00029645083,0.000062367035,0.000063446874,0.00027714466,0.00007272292,0.6611138,0.0067944336,0.32387316,0.0011698661,0.006164529],"study_design_scores_gemma":[0.000017022583,0.000026403035,0.00007206437,0.00000667602,0.0000072089633,0.000059541766,0.0000111545205,0.96518743,0.0005046613,0.0331701,0.00092285295,0.000014888325],"about_ca_topic_score_codex":0.0018568786,"about_ca_topic_score_gemma":0.00085360266,"teacher_disagreement_score":0.0071989624,"about_ca_system_score_codex":0.0009612339,"about_ca_system_score_gemma":0.00085985125,"threshold_uncertainty_score":0.0240829},"labels":[],"label_agreement":null},{"id":"W1984896319","doi":"10.1016/j.ijepes.2009.03.015","title":"A new computational method for reactive power market clearing","year":2009,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; University of New Brunswick","funders":"","keywords":"AC power; Market clearing; Clearing; Integer programming; Linear programming; Mathematical optimization; Computer science; Activity-based costing; Electricity market; Power market; Transformer; Deregulation; Electric power system; Power (physics); Electricity; Economics; Engineering; Voltage; Mathematics; Electrical engineering; Microeconomics; Finance","score_opus":0.0052748606933173455,"score_gpt":0.24928098388860867,"score_spread":0.24400612319529133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1984896319","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012934451,0.00004672833,0.9955402,0.00006369378,0.00011500305,0.000031599462,0.000045972607,0.0004513779,0.0024120624],"genre_scores_gemma":[0.07011422,0.00011957586,0.9208712,0.00014071312,0.00016702911,0.00026766298,0.00019714182,0.00063608063,0.0074863895],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951386,0.00013130129,0.000027778637,0.000070171416,0.00021916727,0.000037764206],"domain_scores_gemma":[0.9988273,0.00057627296,0.000065949724,0.00016749809,0.00029634006,0.00006666064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008273369,0.00076544285,0.0010691299,0.0007888283,0.0008404796,0.001271318,0.0020038062,0.0011569688,0.01501611],"category_scores_gemma":[0.0032396042,0.00058706297,0.00083057676,0.0009957283,0.00058269536,0.0015567014,0.0012489544,0.001655985,0.0029109865],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022714239,0.00018616903,0.00048182858,0.00020743714,0.00010785308,0.00016619852,0.000110581765,0.58971494,0.0066972165,0.071111165,0.01337564,0.31761375],"study_design_scores_gemma":[0.000020859441,0.000008050787,0.000023932738,0.000003814651,0.000004489706,0.000012219219,0.0000037611271,0.99309593,0.00031575898,0.0042892164,0.0022175282,0.0000043966993],"about_ca_topic_score_codex":0.0048783473,"about_ca_topic_score_gemma":0.007977765,"teacher_disagreement_score":0.01501611,"about_ca_system_score_codex":0.00043579465,"about_ca_system_score_gemma":0.0011669564,"threshold_uncertainty_score":0.0502339},"labels":[],"label_agreement":null},{"id":"W1985168609","doi":"10.1109/pesgm.2012.6345495","title":"Intra-hour wind power characteristics for flexible operations","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Laplace transform; Wind speed; Skew; Wind profile power law; Meteorology; Probability density function; Spectral density; Environmental science; Mathematics; Statistics; Computer science; Engineering; Physics; Mathematical analysis; Telecommunications","score_opus":0.010345756475263439,"score_gpt":0.22367619575991,"score_spread":0.21333043928464654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1985168609","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8377537,0.00017383389,0.1563193,0.00020464967,0.00002603107,0.000037422447,0.0005684405,0.00017175854,0.004744851],"genre_scores_gemma":[0.99624807,0.000043751523,0.0030986168,0.000008781301,0.00001143208,0.000008069364,0.0002277665,0.000035672296,0.00031775786],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9997974,0.000055112665,0.000010456816,0.000031525007,0.0000731327,0.000032278018],"domain_scores_gemma":[0.9981894,0.0010707072,0.00034200144,0.00019147793,0.00015357054,0.000052789826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00067661045,0.00032911345,0.00028224173,0.0005035743,0.00020911105,0.00065172894,0.00029886403,0.00025351119,0.0013272137],"category_scores_gemma":[0.0036521447,0.0001421773,0.00031739924,0.00084962,0.00019444365,0.0009456362,0.00028972907,0.00054190983,0.00019221981],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015514385,0.000074052376,0.13776839,0.000050219915,0.00008985068,0.00036552755,0.00018872425,0.8005995,0.0057038185,0.0050856886,0.0008379762,0.049081203],"study_design_scores_gemma":[0.0000032281973,0.00006412917,0.11469216,0.000010978912,0.00001423538,0.00012049119,0.00013761011,0.8786126,0.0010674495,0.0040121293,0.0012458256,0.000019204417],"about_ca_topic_score_codex":0.0023035968,"about_ca_topic_score_gemma":0.003845712,"teacher_disagreement_score":0.0023035968,"about_ca_system_score_codex":0.00024168426,"about_ca_system_score_gemma":0.00024138877,"threshold_uncertainty_score":0.0045803785},"labels":[],"label_agreement":null},{"id":"W1986421638","doi":"10.1016/j.jup.2004.04.006","title":"Important variables in explaining real-time peak price in the independent power market of Ontario","year":2004,"lang":"en","type":"article","venue":"Utilities Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Econometrics; Explanatory power; Economics; Variables; Variable (mathematics); Competition (biology); Electricity market; Electricity; Support vector machine; Predictive power; Statistics; Mathematics; Computer science; Machine learning; Engineering","score_opus":0.0058103082784255735,"score_gpt":0.20533980238462687,"score_spread":0.1995294941062013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1986421638","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99100506,0.00023910507,0.0005552228,0.0016873726,0.00001707091,0.000017034172,0.00050596875,0.000014338644,0.0059587453],"genre_scores_gemma":[0.9975434,0.00011327667,0.000057608577,0.000033432603,0.000015343465,0.0000023152445,0.0001955816,0.000004763421,0.002034246],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995982,0.00007519494,0.000019042725,0.00004554436,0.00008303184,0.0001789966],"domain_scores_gemma":[0.9962154,0.0018999814,0.0007162872,0.00008523924,0.0004422194,0.0006408922],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010103798,0.00021972219,0.00034860344,0.00060891133,0.0014302124,0.002999823,0.0007251671,0.0010710536,0.0038394842],"category_scores_gemma":[0.005647382,0.000368077,0.00043631427,0.001032833,0.001187034,0.001103804,0.00041277232,0.0012970997,0.00024392005],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008163008,0.00026518956,0.90714556,0.000070787144,0.00031280433,0.00090147334,0.0011018065,0.050944783,0.0015019878,0.02044696,0.006776927,0.009715391],"study_design_scores_gemma":[0.00010865902,0.00006300203,0.89391744,0.000023843739,0.00016046576,0.000080436024,0.0030849,0.088536255,0.00059656636,0.006438811,0.0069414293,0.000048197384],"about_ca_topic_score_codex":0.86941123,"about_ca_topic_score_gemma":0.93950236,"teacher_disagreement_score":0.13058877,"about_ca_system_score_codex":0.014365736,"about_ca_system_score_gemma":0.009780578,"threshold_uncertainty_score":0.26271564},"labels":[],"label_agreement":null},{"id":"W1986867400","doi":"10.1109/tdc.2010.5484550","title":"Economic load dispatch with stochastic wind power: Model and solutions","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; University of Alberta","funders":"","keywords":"Economic dispatch; Wind power; Probabilistic logic; Wind speed; Constraint (computer-aided design); Electric power system; Mathematical optimization; Computer science; Random variable; Stochastic process; Set (abstract data type); Power (physics); Control theory (sociology); Engineering; Mathematics; Meteorology; Statistics; Artificial intelligence","score_opus":0.0038410147944908384,"score_gpt":0.17129110412012596,"score_spread":0.16745008932563513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1986867400","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051527254,0.00076370634,0.92953664,0.0012990301,0.00010108496,0.000075588505,0.00039195604,0.00016272478,0.01614206],"genre_scores_gemma":[0.92147386,0.0012427752,0.06070122,0.00015256126,0.00015068353,0.0003088804,0.00042449255,0.00010636474,0.015439016],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959,0.00017882211,0.000014925872,0.000052436506,0.00011817752,0.000045722936],"domain_scores_gemma":[0.9994412,0.00028676674,0.00012790252,0.000027783717,0.000077713565,0.000038548973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00082693814,0.0007748614,0.0010637201,0.00046669703,0.0003640073,0.0010893336,0.0012924906,0.0015988621,0.00252744],"category_scores_gemma":[0.0022664214,0.0006641748,0.00047839576,0.000922635,0.0008349415,0.0015665807,0.0009442281,0.0012069098,0.00040435116],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000072465336,0.00000890327,0.00005799624,0.000011392963,0.0000053070544,0.000027609429,0.000006086785,0.97820115,0.00008447833,0.020553846,0.0002272746,0.00080861745],"study_design_scores_gemma":[0.000006045431,0.0000033825133,0.000024382121,0.0000014575879,0.0000010287346,0.000004220648,0.000002215974,0.99297136,0.000023977069,0.006707742,0.0002519039,0.0000023448447],"about_ca_topic_score_codex":0.004035796,"about_ca_topic_score_gemma":0.0033273466,"teacher_disagreement_score":0.004035796,"about_ca_system_score_codex":0.0010792551,"about_ca_system_score_gemma":0.0011817197,"threshold_uncertainty_score":0.008455157},"labels":[],"label_agreement":null},{"id":"W1987959842","doi":"10.1111/j.1467-9965.2002.tb00125.x","title":"A DIFFUSION MODEL FOR ELECTRICITY PRICES","year":2002,"lang":"en","type":"article","venue":"Mathematical Finance","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Electricity; Spot contract; Econometrics; Economics; Diffusion; Electricity market; Electricity demand; Financial economics; Electricity generation; Power (physics); Engineering; Thermodynamics; Physics; Electrical engineering; Futures contract","score_opus":0.016310157059746467,"score_gpt":0.20217307252361827,"score_spread":0.1858629154638718,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1987959842","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.047092654,0.0015012114,0.9196277,0.0037583727,0.00028860927,0.00010715095,0.0010646894,0.00056858425,0.02599101],"genre_scores_gemma":[0.87988085,0.0029292894,0.060962904,0.00071094144,0.0004866367,0.00029386053,0.001194768,0.0001621223,0.053378765],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941194,0.00013698758,0.000035913617,0.0001587999,0.00015720316,0.00009929041],"domain_scores_gemma":[0.99915266,0.00039154716,0.00014536764,0.00007126762,0.00015203527,0.000087252745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001078606,0.00095102895,0.0010223691,0.0010318186,0.0005871237,0.0016695927,0.0017676195,0.0024990719,0.007881083],"category_scores_gemma":[0.0042247535,0.00045374746,0.0011798341,0.0011622697,0.0013323678,0.003345895,0.0010593069,0.002468347,0.0016440933],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000064787484,0.00005358894,0.0010970132,0.00009128208,0.000050825613,0.0003491443,0.0001674989,0.23535165,0.0041980213,0.7416654,0.005870915,0.011039842],"study_design_scores_gemma":[0.000054009193,0.000025765523,0.0003596905,0.000011353953,0.00001784215,0.0001498571,0.00001907961,0.8458285,0.00032630225,0.14914483,0.004026013,0.000036755107],"about_ca_topic_score_codex":0.00955328,"about_ca_topic_score_gemma":0.0048350417,"teacher_disagreement_score":0.00955328,"about_ca_system_score_codex":0.0015939872,"about_ca_system_score_gemma":0.00085893297,"threshold_uncertainty_score":0.026364803},"labels":[],"label_agreement":null},{"id":"W1988194224","doi":"10.1016/j.eneco.2009.02.007","title":"Multiple zone power forwards: A value at risk framework","year":2009,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Center for Interuniversity Research and Analysis on Organizations","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Volatility (finance); Spot contract; Forward contract; Natural gas prices; Economics; Electricity; Electricity market; Context (archaeology); Value (mathematics); Econometrics; Value at risk; Risk management; Forward price; Microeconomics; Financial economics; Computer science; Finance; Engineering; Futures contract","score_opus":0.0027228789434463932,"score_gpt":0.16189124863747276,"score_spread":0.15916836969402637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1988194224","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021758793,0.0016324243,0.9197248,0.0070997654,0.00030566988,0.00008745945,0.00026659627,0.00019646724,0.048927892],"genre_scores_gemma":[0.8908644,0.0026257886,0.06351484,0.00049159833,0.00088070484,0.0001755187,0.0001579139,0.00016981577,0.041119464],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973603,0.0012742223,0.00007102765,0.0003744692,0.00056334084,0.0003567391],"domain_scores_gemma":[0.99491477,0.0034557246,0.0005068775,0.00030816506,0.0004731815,0.00034117769],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00521791,0.0020955398,0.0025036882,0.0016623711,0.0012385921,0.0058091073,0.004497927,0.005797448,0.009864278],"category_scores_gemma":[0.012147284,0.0016590189,0.0016719764,0.0018538533,0.0038903318,0.010924609,0.0028711273,0.0062148627,0.0007435445],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057420657,0.000048243142,0.00020451551,0.000052447,0.000048584807,0.00015742138,0.00006593577,0.22734085,0.00020254737,0.7619578,0.0021641315,0.0077001066],"study_design_scores_gemma":[0.000022800219,0.000027215467,0.000113784634,0.000024844021,0.000034966622,0.000060827846,0.00005315942,0.32486922,0.00011437975,0.6724393,0.0022086839,0.000030799518],"about_ca_topic_score_codex":0.0033861094,"about_ca_topic_score_gemma":0.0032657478,"teacher_disagreement_score":0.009864278,"about_ca_system_score_codex":0.0027813588,"about_ca_system_score_gemma":0.0023833117,"threshold_uncertainty_score":0.032999277},"labels":[],"label_agreement":null},{"id":"W1989128939","doi":"10.1016/j.enpol.2010.07.027","title":"Power sector reform in Maharashtra, India","year":2010,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Power; Canada Excellence Research Chairs, Government of Canada","keywords":"Tariff; Restructuring; Scope (computer science); Electricity; Context (archaeology); Business; Electric power industry; Electric power distribution; Distribution (mathematics); Scarcity; Mains electricity; Industrial organization; Economics; Finance; Power (physics); Engineering; Market economy; International trade","score_opus":0.002459259940806522,"score_gpt":0.1893973282938608,"score_spread":0.18693806835305427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1989128939","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75063246,0.0044200597,0.0013586201,0.055800535,0.00030198772,0.00009593073,0.0008969327,0.00022401343,0.18626946],"genre_scores_gemma":[0.9830294,0.00077669404,0.00023366377,0.0014645878,0.00006296771,0.000017619901,0.000109892855,0.000016123384,0.014288962],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9988078,0.0002533152,0.000056368997,0.0000829067,0.00024133612,0.0005583302],"domain_scores_gemma":[0.99886024,0.00048582483,0.0001409734,0.000077238205,0.00022050654,0.00021517614],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069707975,0.00023015578,0.0003370442,0.000816314,0.0019036524,0.005398288,0.0008831148,0.0014277067,0.006812941],"category_scores_gemma":[0.0031203122,0.00028283976,0.0003923285,0.0022722702,0.0018899911,0.0011452695,0.0015279368,0.0020632658,0.00038242168],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005150807,0.00035636447,0.022765847,0.0005616935,0.00013363599,0.0025549291,0.004069876,0.035757437,0.003945987,0.850663,0.028745579,0.049930573],"study_design_scores_gemma":[0.00042041708,0.0006242537,0.38324904,0.0005438112,0.00033281322,0.0016508014,0.018845215,0.03918173,0.0081833135,0.09623563,0.45054612,0.00018688814],"about_ca_topic_score_codex":0.112445705,"about_ca_topic_score_gemma":0.20851034,"teacher_disagreement_score":0.112445705,"about_ca_system_score_codex":0.014005747,"about_ca_system_score_gemma":0.01930488,"threshold_uncertainty_score":0.22358239},"labels":[],"label_agreement":null},{"id":"W1989206067","doi":"10.1109/ccece.2007.324","title":"Transmission Loss Recovery In A Deregulated Power System Network - A Practical Example","year":2007,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Alberta Energy","funders":"","keywords":"Operator (biology); Electric power system; Generator (circuit theory); Transmission network; Transmission system; Transmission loss; Computer science; Transmission (telecommunications); Structuring; Reliability engineering; Electric power; Power (physics); Telecommunications; Engineering; Economics","score_opus":0.008116690970489176,"score_gpt":0.21560721260364574,"score_spread":0.20749052163315657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1989206067","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7223906,0.0007345646,0.24037763,0.0014237253,0.00009781793,0.00028331374,0.00042263817,0.00058465294,0.033685125],"genre_scores_gemma":[0.9727936,0.00024697976,0.022972688,0.000032448854,0.000011355154,0.00003883931,0.000057712718,0.000027190596,0.0038192498],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99954516,0.00023955117,0.000013098079,0.00003847728,0.00009649526,0.0000671361],"domain_scores_gemma":[0.99929345,0.00043130066,0.00005168803,0.000051726445,0.00014157112,0.000030331048],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010332405,0.0006701116,0.000516369,0.0005623828,0.0007012619,0.00086191477,0.0009244234,0.001043906,0.0022339735],"category_scores_gemma":[0.0014190247,0.00023082056,0.00048009792,0.0008597567,0.0005805262,0.0010967327,0.0005821305,0.0009527135,0.00016880977],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014741831,0.00008083699,0.00067423703,0.000051920775,0.000011865921,0.0008107374,0.00007264516,0.9764837,0.001036589,0.008698817,0.0007130394,0.0112182675],"study_design_scores_gemma":[0.000046484125,0.00012163698,0.0003116557,0.000006039137,0.000008493505,0.00010714962,0.0000909296,0.99408454,0.0009834905,0.003519809,0.0007114968,0.000008321691],"about_ca_topic_score_codex":0.012661688,"about_ca_topic_score_gemma":0.012613422,"teacher_disagreement_score":0.012661688,"about_ca_system_score_codex":0.0016753505,"about_ca_system_score_gemma":0.00051942916,"threshold_uncertainty_score":0.025175989},"labels":[],"label_agreement":null},{"id":"W1991053377","doi":"10.1109/tpwrs.2014.2360369","title":"A Fully Decentralized Approach for Solving the Economic Dispatch Problem","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":162,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Economic dispatch; Mathematical optimization; Computer science; Nondeterministic algorithm; Flooding (psychology); Electric power system; Power (physics); Mathematics; Algorithm","score_opus":0.006813465047826147,"score_gpt":0.1927440587862599,"score_spread":0.18593059373843374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1991053377","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0033950615,0.00006320435,0.99263966,0.00012637657,0.000036248468,0.00005039157,0.000029285084,0.00008158986,0.0035782869],"genre_scores_gemma":[0.36034232,0.0004191416,0.6290391,0.00013540623,0.00016938713,0.0004096953,0.00018912202,0.00009953796,0.009196232],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992249,0.00026422576,0.000033692155,0.00012968274,0.000291669,0.000055785742],"domain_scores_gemma":[0.9994778,0.00023945418,0.00005616183,0.00006758149,0.00012917904,0.00002990833],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00086639484,0.00052180287,0.0008436012,0.00046745036,0.0005778959,0.0008275097,0.0010610466,0.00082287827,0.003469004],"category_scores_gemma":[0.0016389318,0.0003300992,0.0005599206,0.00051611214,0.00042315948,0.0011239841,0.0010491078,0.0009814831,0.0004708082],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050475053,0.00007494185,0.00032367,0.00012770122,0.000057357305,0.00016599419,0.000084826264,0.837772,0.005044561,0.06979211,0.0031624024,0.08334396],"study_design_scores_gemma":[0.000020144125,0.000023559023,0.000089679634,0.0000044395883,0.0000056531303,0.00003630174,0.000011935796,0.9811601,0.0004951855,0.015006572,0.0031385755,0.000007803916],"about_ca_topic_score_codex":0.0019625777,"about_ca_topic_score_gemma":0.003006403,"teacher_disagreement_score":0.003469004,"about_ca_system_score_codex":0.000533098,"about_ca_system_score_gemma":0.0015550496,"threshold_uncertainty_score":0.011604905},"labels":[],"label_agreement":null},{"id":"W1992605262","doi":"10.1109/tsg.2013.2286623","title":"Equilibrium in Wholesale Energy Markets: Perturbation Analysis in the Presence of Renewables","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Electric Power System Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Alberta Energy","funders":"","keywords":"Intermittency; Renewable energy; Smart grid; Karush–Kuhn–Tucker conditions; Wind power; Demand response; Grid; Energy market; Market integration; Mathematical optimization; Computer science; Economics; Econometrics; Microeconomics; Electricity; Mathematics; Engineering; Electrical engineering; Physics","score_opus":0.005860551682648118,"score_gpt":0.19058193884294689,"score_spread":0.18472138716029876,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1992605262","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25515231,0.0010751166,0.7022934,0.0016798207,0.00013043315,0.0001799265,0.00027484685,0.0001963254,0.03901785],"genre_scores_gemma":[0.98343694,0.00049274456,0.011744705,0.00009978686,0.000045935387,0.00007913056,0.000057062174,0.00004574086,0.0039979396],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994511,0.00031970898,0.000014335976,0.000051301122,0.00009999256,0.00006365273],"domain_scores_gemma":[0.99754435,0.0017248316,0.00032168062,0.000085936124,0.0002318528,0.00009126217],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001499103,0.0007108512,0.00078871934,0.000628406,0.00044886358,0.001393485,0.0006447908,0.0008416637,0.0025426757],"category_scores_gemma":[0.0049264687,0.00031349747,0.0009465353,0.00057770207,0.001515966,0.0014735726,0.001145042,0.0011832797,0.00022749431],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008542643,0.000056810517,0.000599204,0.000056288423,0.000048910853,0.0002863659,0.00008115742,0.9072713,0.0021794492,0.08620438,0.0007250265,0.0024057806],"study_design_scores_gemma":[0.000003952426,0.000011475369,0.000105352876,0.0000029489738,0.000004387309,0.000014959639,0.000027859509,0.9869175,0.000114970855,0.012665202,0.00012652102,0.0000049669893],"about_ca_topic_score_codex":0.004157825,"about_ca_topic_score_gemma":0.0017664294,"teacher_disagreement_score":0.004157825,"about_ca_system_score_codex":0.0008495524,"about_ca_system_score_gemma":0.0006091026,"threshold_uncertainty_score":0.008506119},"labels":[],"label_agreement":null},{"id":"W1992972827","doi":"10.1109/tpwrs.2012.2186155","title":"Fast Heuristics for Transmission-Line Switching","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":155,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Heuristics; Heuristic; Mathematical optimization; Computer science; Line (geometry); Linear programming; Integer programming; Algorithm; Mathematics","score_opus":0.012935029410388594,"score_gpt":0.22774537180671672,"score_spread":0.21481034239632812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1992972827","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03401206,0.0006937979,0.94802696,0.000286644,0.000102475635,0.00040288255,0.0003102448,0.0021163828,0.014048546],"genre_scores_gemma":[0.3310478,0.00058487954,0.6627969,0.00020446676,0.00005978016,0.0004788067,0.00066303136,0.00038177532,0.0037825347],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906665,0.0003944124,0.000043832937,0.0001187589,0.00019003227,0.00018628882],"domain_scores_gemma":[0.9975528,0.0018176973,0.00018432755,0.00016758089,0.00020312612,0.00007448615],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012938583,0.0013756263,0.0013348929,0.0012522319,0.0007176104,0.0013660906,0.0013961636,0.000983173,0.0074131996],"category_scores_gemma":[0.0032801274,0.000782681,0.0010165902,0.0016126597,0.000693691,0.0013389271,0.0008311167,0.0012866693,0.000769514],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018610788,0.000126263,0.00032330016,0.00018279772,0.000038958056,0.00007914527,0.00007990542,0.88920456,0.0015254625,0.021934003,0.004541341,0.08177814],"study_design_scores_gemma":[0.00010041345,0.000065133165,0.00010684584,0.000019234387,0.000021168384,0.000030552812,0.00003925005,0.98203456,0.00091332936,0.013814359,0.0028440496,0.00001108585],"about_ca_topic_score_codex":0.0063494667,"about_ca_topic_score_gemma":0.0073391465,"teacher_disagreement_score":0.0074131996,"about_ca_system_score_codex":0.0018216738,"about_ca_system_score_gemma":0.0025050938,"threshold_uncertainty_score":0.024799645},"labels":[],"label_agreement":null},{"id":"W1993258694","doi":"10.1109/ccece.2010.5575151","title":"An overview of the operation of the Alberta electricity market","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Electricity; Electricity market; Electricity retailing; Key (lock); Operator (biology); Industrial organization; Electricity generation; Environmental economics; Electricity system; Computer science; Business; Engineering; Electrical engineering; Economics; Power (physics); Computer security","score_opus":0.008079968415305033,"score_gpt":0.22087068445100574,"score_spread":0.2127907160357007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993258694","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06675655,0.09505652,0.018014127,0.0081675425,0.00073572446,0.00021300332,0.0038708423,0.00045813335,0.8067275],"genre_scores_gemma":[0.5792381,0.15291955,0.034122013,0.0019450379,0.0011501361,0.000089162364,0.004907432,0.00021202865,0.22541654],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988759,0.00008621084,0.000026570198,0.000065976965,0.00073867204,0.00020665332],"domain_scores_gemma":[0.9995492,0.000045489258,0.00003522285,0.000016425916,0.0002754059,0.00007818467],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060118496,0.00054530863,0.00024087356,0.0031914301,0.0016594802,0.00510548,0.0009934751,0.0008627837,0.0063864263],"category_scores_gemma":[0.0006141072,0.0002881822,0.00024676963,0.0056246724,0.0008636552,0.0012134971,0.0006951168,0.0005731188,0.0008085153],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017628052,0.00014535192,0.022768723,0.000900888,0.00006854652,0.0020437757,0.0016611709,0.04718312,0.006566832,0.28162715,0.14033455,0.4965237],"study_design_scores_gemma":[0.0000102401555,0.000067387504,0.057494327,0.00037582743,0.000033601802,0.0007741494,0.0015970028,0.013541307,0.0010322429,0.019233597,0.9057317,0.000108683016],"about_ca_topic_score_codex":0.76754427,"about_ca_topic_score_gemma":0.85062504,"teacher_disagreement_score":0.98288405,"about_ca_system_score_codex":0.017115926,"about_ca_system_score_gemma":0.015333048,"threshold_uncertainty_score":0.4676494},"labels":[],"label_agreement":null},{"id":"W1996945628","doi":"10.1111/1468-0076.00112","title":"A simple economic analysis of electricity deregulation failure","year":2002,"lang":"en","type":"article","venue":"OPEC Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Deregulation; Confusion; Electricity; Simple (philosophy); Electricity market; Economics; Market economy; Mainstream; Business; Political science; Engineering; Law","score_opus":0.010152164269605319,"score_gpt":0.2155448072654133,"score_spread":0.20539264299580798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1996945628","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18565562,0.013217973,0.14054431,0.03838702,0.0006484208,0.00025152758,0.0014523756,0.00021245536,0.6196304],"genre_scores_gemma":[0.94852823,0.005819464,0.0033242528,0.00087433384,0.00038940785,0.00010550952,0.00017175132,0.00004602793,0.040741034],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937505,0.00021364162,0.00002294915,0.00007127437,0.00016064242,0.00015649342],"domain_scores_gemma":[0.99930465,0.0003116366,0.00013296786,0.00005348983,0.00013296634,0.000064286425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011601069,0.00091958,0.00081956724,0.001996098,0.0010857643,0.0030074422,0.0011376782,0.0019579327,0.009151842],"category_scores_gemma":[0.0031861388,0.00030915343,0.0010019309,0.0019513987,0.0025034847,0.004531526,0.0019753634,0.0023773476,0.00082431047],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023397179,0.000029371247,0.00053999486,0.00006893097,0.000030498682,0.00027531793,0.00010143866,0.036815427,0.00026025716,0.95230865,0.0039460645,0.0056006797],"study_design_scores_gemma":[0.00002867354,0.0000725915,0.0017356025,0.000108582695,0.000036995654,0.00022997832,0.00033632075,0.04492222,0.00028213565,0.92328364,0.02892647,0.000036764577],"about_ca_topic_score_codex":0.0070392224,"about_ca_topic_score_gemma":0.0045286035,"teacher_disagreement_score":0.009151842,"about_ca_system_score_codex":0.002614548,"about_ca_system_score_gemma":0.0013978346,"threshold_uncertainty_score":0.030615985},"labels":[],"label_agreement":null},{"id":"W1997208357","doi":"10.1016/s0840-4704(10)60740-5","title":"What's Old is New Again: <i>Change at VON Means Return to Core Values</i>","year":2000,"lang":"en","type":"article","venue":"Healthcare Management Forum","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CARE Canada","funders":"","keywords":"Core (optical fiber); Business; Computer science; Telecommunications","score_opus":0.025041464237228434,"score_gpt":0.2529111098440196,"score_spread":0.22786964560679115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1997208357","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005169557,0.012008706,0.018842572,0.64712036,0.063563325,0.000025166071,0.00014957509,0.00034933715,0.25277138],"genre_scores_gemma":[0.277528,0.014168901,0.01993055,0.42608726,0.030377073,0.00014267825,0.00026561762,0.0010570035,0.23044302],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972723,0.00071711,0.00012647428,0.00039966145,0.0011265608,0.0003579153],"domain_scores_gemma":[0.9966209,0.0010098944,0.0002771928,0.00045458597,0.0011982641,0.00043916347],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002985651,0.00048184925,0.00043711314,0.00076454406,0.0039029373,0.009917059,0.0011864799,0.005005796,0.019806098],"category_scores_gemma":[0.009354268,0.00022502465,0.00048517037,0.0010993404,0.009745243,0.015829226,0.0027460924,0.006795932,0.0050863116],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035732497,0.000031150747,0.0006360606,0.00018666526,0.000022542994,0.00015988754,0.002189997,0.00016418727,0.00066339015,0.41012666,0.5222006,0.06358322],"study_design_scores_gemma":[0.0000056331205,0.000021984566,0.0011289429,0.0002292545,0.000012463511,0.00019889767,0.0024636064,0.0002073363,0.00061756495,0.19261199,0.80246454,0.000037882714],"about_ca_topic_score_codex":0.0047333874,"about_ca_topic_score_gemma":0.009746058,"teacher_disagreement_score":0.019806098,"about_ca_system_score_codex":0.0026972394,"about_ca_system_score_gemma":0.00399968,"threshold_uncertainty_score":0.06625795},"labels":[],"label_agreement":null},{"id":"W1998397026","doi":"10.3138/infor.48.4.261","title":"An Adaptive Learning Game Model for Interacting Electric Power Markets","year":2010,"lang":"en","type":"article","venue":"INFOR Information Systems and Operational Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Oligopoly; Microeconomics; Variable pricing; Profit (economics); Interconnection; Economics; Nash equilibrium; Competition (biology); Order (exchange); Adaptive learning; Computer science; Mathematical optimization; Cournot competition; Mathematics; Artificial intelligence; Telecommunications","score_opus":0.025556508725074988,"score_gpt":0.3108355403238141,"score_spread":0.28527903159873913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1998397026","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2131606,0.00022439274,0.76504475,0.0007425529,0.000097909215,0.00020137678,0.00035840186,0.00025007027,0.019919978],"genre_scores_gemma":[0.9688083,0.00012267045,0.020502692,0.00010182538,0.00002743098,0.00023921198,0.00011615657,0.000018303215,0.010063343],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992053,0.00039451921,0.000028881857,0.00014724683,0.000117149924,0.000106933476],"domain_scores_gemma":[0.99895716,0.0006166818,0.00016791622,0.00004433339,0.00011933348,0.00009453443],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00096730335,0.00084655243,0.0011383074,0.00045662548,0.0004368609,0.0016355499,0.0019224305,0.0018034342,0.003852638],"category_scores_gemma":[0.002548681,0.00042176683,0.0008112727,0.00059281365,0.001462681,0.0016022642,0.00092651014,0.0014322925,0.00035258444],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004018519,0.000035613648,0.00023348666,0.000012445551,0.000021029375,0.0000839818,0.000031413056,0.975744,0.00033012906,0.022452395,0.00011910544,0.0008961117],"study_design_scores_gemma":[0.000013494207,0.000015652613,0.00004325664,0.000001007868,0.0000033892725,0.0000072655134,0.0000064666683,0.9968856,0.000036134006,0.0028600388,0.00012362633,0.0000040341642],"about_ca_topic_score_codex":0.009896802,"about_ca_topic_score_gemma":0.0052484875,"teacher_disagreement_score":0.009896802,"about_ca_system_score_codex":0.0011821003,"about_ca_system_score_gemma":0.0010475293,"threshold_uncertainty_score":0.019678414},"labels":[],"label_agreement":null},{"id":"W2000048570","doi":"10.1016/j.desal.2003.12.007","title":"Energy and exergy use in the utility sector of Saudi Arabia","year":2004,"lang":"en","type":"article","venue":"Desalination","topic":"Electric Power System Optimization","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Exergy; Waste management; Energy sector; Environmental science; Engineering; Environmental engineering; Economics; Environmental economics","score_opus":0.012831313227765706,"score_gpt":0.19898863559295848,"score_spread":0.18615732236519278,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000048570","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9992223,0.0001016299,0.00007134467,0.000020051793,5.8092826e-7,0.0000012075249,0.000106799744,0.000001408018,0.00047465286],"genre_scores_gemma":[0.9994242,0.00007416274,0.00005460397,0.0000021650894,3.7739903e-7,5.597947e-7,0.00007508963,7.527999e-7,0.00036801308],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99992883,0.000018216948,0.0000061541364,0.000008979348,0.000016260088,0.000021565289],"domain_scores_gemma":[0.99984646,0.00004936111,0.0000280659,0.000006858882,0.000053540884,0.00001579225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017889333,0.00018110561,0.00015399276,0.00039998733,0.00025290475,0.00047543313,0.00019822881,0.0002045853,0.0008279797],"category_scores_gemma":[0.00035627504,0.000097254415,0.0002365588,0.0006493837,0.00015633942,0.00038597695,0.00021001081,0.00011637764,0.00012832962],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022646475,0.0002517168,0.6142077,0.00031434695,0.00037201223,0.0018032612,0.0023174305,0.27511844,0.02361546,0.009603037,0.0019485785,0.06818346],"study_design_scores_gemma":[0.000037017264,0.00034256914,0.787526,0.00005313463,0.00014738647,0.00049318804,0.006422112,0.18057138,0.016815972,0.0014847539,0.0060569956,0.000049563496],"about_ca_topic_score_codex":0.08853,"about_ca_topic_score_gemma":0.08938909,"teacher_disagreement_score":0.08853,"about_ca_system_score_codex":0.0015865556,"about_ca_system_score_gemma":0.00047875682,"threshold_uncertainty_score":0.17602938},"labels":[],"label_agreement":null},{"id":"W2000653477","doi":"","title":"Hydro Québec's distribution vision","year":2009,"lang":"en","type":"article","venue":"Electricity Distribution - Part 2, 2009. CIRED 2009. The 20th International Conference and Exhibition on","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Distribution (mathematics); Environmental science; Computer science; Mathematics","score_opus":0.012597498210477197,"score_gpt":0.23834832943277984,"score_spread":0.22575083122230263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000653477","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005675395,0.009760318,0.006713282,0.050020248,0.003523565,0.000094764444,0.010634786,0.0012357027,0.9123419],"genre_scores_gemma":[0.05562567,0.0035984074,0.0036638128,0.004055266,0.00019689767,0.000041800056,0.0028330968,0.00022885708,0.92975616],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99948704,0.00003481305,0.000011089059,0.00008090479,0.00026348094,0.0001226447],"domain_scores_gemma":[0.9991841,0.000020486392,0.00001951197,0.000037659083,0.00060358166,0.00013475423],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00057454046,0.00063518336,0.00026120176,0.0007756415,0.0024664046,0.003620612,0.0009504551,0.0015830932,0.05873079],"category_scores_gemma":[0.0010686631,0.00024381402,0.00024151702,0.0015073854,0.0007951493,0.0013209803,0.0007925886,0.0016824821,0.006874031],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036724217,0.000018362274,0.00092596427,0.000064850385,0.000007621371,0.00017124691,0.00014723306,0.0009524897,0.00058108923,0.058952957,0.86738133,0.07076008],"study_design_scores_gemma":[0.0000055529536,0.00000420761,0.0010674231,0.000039082748,0.0000023004975,0.000045551526,0.00009224919,0.0004944597,0.0001338747,0.001636763,0.9964706,0.000007915419],"about_ca_topic_score_codex":0.953166,"about_ca_topic_score_gemma":0.9725328,"teacher_disagreement_score":0.9730843,"about_ca_system_score_codex":0.026915733,"about_ca_system_score_gemma":0.038235556,"threshold_uncertainty_score":0.19647402},"labels":[],"label_agreement":null},{"id":"W2003657011","doi":"10.1109/pes.2006.1709558","title":"International power engineering research collaborations","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"","keywords":"George (robot); Renewable energy; Power engineering; Power (physics); Engineering; Key (lock); Panel discussion; Engineering management; Telecommunications; Electrical engineering; Electric power system; Computer science; Business; Computer security","score_opus":0.01013856854834664,"score_gpt":0.2354843770574615,"score_spread":0.22534580850911487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2003657011","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0044778287,0.056087546,0.018486293,0.11612633,0.07472563,0.0007063534,0.0027069224,0.0010038904,0.7256793],"genre_scores_gemma":[0.07021132,0.052511137,0.018802145,0.031962216,0.024131678,0.00084310584,0.007350226,0.0010603102,0.79312795],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.98124415,0.004731387,0.0012179195,0.001617996,0.007921078,0.0032674195],"domain_scores_gemma":[0.95408803,0.004957883,0.0020765741,0.0033849087,0.019910004,0.015582591],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022022948,0.0014135056,0.0009155436,0.003760791,0.004095732,0.011194808,0.0017700924,0.0036376817,0.13844042],"category_scores_gemma":[0.023954062,0.00046420173,0.00089954416,0.00806394,0.0009901951,0.0062054396,0.009643325,0.0059837727,0.03961612],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011743526,0.00011668396,0.0007885874,0.00070560887,0.000023715369,0.00018978296,0.0010870193,0.00040365336,0.00084119564,0.066200286,0.7628539,0.16667214],"study_design_scores_gemma":[0.000005369937,0.000012629869,0.00018785645,0.0001290876,0.0000034538352,0.00006319532,0.0002895237,0.000031310698,0.00011165115,0.0025464678,0.99661523,0.0000042648194],"about_ca_topic_score_codex":0.001415214,"about_ca_topic_score_gemma":0.0028599468,"teacher_disagreement_score":0.13844042,"about_ca_system_score_codex":0.003157914,"about_ca_system_score_gemma":0.016519638,"threshold_uncertainty_score":0.46312934},"labels":[],"label_agreement":null},{"id":"W2003683056","doi":"10.1016/j.energy.2005.02.018","title":"Electricity deregulation, spot price patterns and demand-side management","year":2005,"lang":"en","type":"article","venue":"Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"University of Alberta","keywords":"Volatility (finance); Spot contract; Deregulation; Economics; Electricity; Consumption (sociology); Econometrics; Monetary economics; Financial economics; Macroeconomics; Futures contract","score_opus":0.0030897695532289032,"score_gpt":0.17047399629182772,"score_spread":0.16738422673859882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2003683056","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.951075,0.0004570413,0.035911493,0.00090951,0.000045192835,0.000029726705,0.00034348728,0.000060345872,0.01116804],"genre_scores_gemma":[0.9968449,0.00013218734,0.0009985178,0.000021579754,0.000011724431,0.0000045095353,0.000057456953,0.000011577012,0.0019176516],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.999772,0.00011488026,0.000011201905,0.000031513267,0.000032002783,0.00003838353],"domain_scores_gemma":[0.9992567,0.00045718893,0.0001380944,0.000034451732,0.0000813756,0.000032300428],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00084174477,0.00041432522,0.00055939093,0.0002218845,0.00018287994,0.0011066993,0.0004849087,0.00065928686,0.0037902654],"category_scores_gemma":[0.0028452424,0.0004303917,0.00023779711,0.0006891418,0.00037818713,0.0017245731,0.0002928053,0.00042540437,0.0002460132],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00072420546,0.00013302284,0.021654775,0.000065324166,0.00013627937,0.00035643295,0.00005047726,0.92176,0.003525037,0.026809014,0.0013510265,0.023434343],"study_design_scores_gemma":[0.000046775218,0.00013863083,0.016802752,0.000006113909,0.00004973994,0.0001601826,0.00012563681,0.9474048,0.0015490799,0.032791786,0.0009087191,0.000015813406],"about_ca_topic_score_codex":0.0019078082,"about_ca_topic_score_gemma":0.0058398447,"teacher_disagreement_score":0.0037902654,"about_ca_system_score_codex":0.00066124287,"about_ca_system_score_gemma":0.000451472,"threshold_uncertainty_score":0.012679696},"labels":[],"label_agreement":null},{"id":"W2004531005","doi":"10.1109/tpwrs.2002.1008372","title":"Closure to discussion of \"z-bus loss allocation\"","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Closure (psychology); Computer science; Operations research; Engineering; Economics","score_opus":0.009031565387675721,"score_gpt":0.19659365069461435,"score_spread":0.18756208530693863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2004531005","genre_codex":"methods","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01549594,0.008302189,0.49940887,0.02291472,0.015209781,0.00039702607,0.0031995922,0.001544937,0.4335268],"genre_scores_gemma":[0.55556136,0.0075817583,0.13037205,0.022586739,0.006470924,0.001303561,0.0016110975,0.0016619982,0.27285045],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99918336,0.0003562828,0.000046051817,0.00015919493,0.00015237555,0.000102725375],"domain_scores_gemma":[0.9994467,0.00019809812,0.00009036629,0.00012537529,0.00012090478,0.000018609462],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00075724174,0.00072967785,0.00037452238,0.0006810637,0.00097342924,0.001481302,0.0021061471,0.0013496772,0.051573068],"category_scores_gemma":[0.003020955,0.00026040134,0.0005336646,0.00097654015,0.0012174185,0.0025448462,0.0013549686,0.0020816312,0.010830197],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006226974,0.000034999786,0.0005844496,0.00021399278,0.000027283373,0.00019347428,0.0003034098,0.0036577063,0.0014487999,0.8506739,0.112158455,0.030641252],"study_design_scores_gemma":[0.000014705651,0.000056032706,0.0010981688,0.00011127981,0.000018398076,0.00024917524,0.00023316476,0.011784458,0.0034360383,0.19438523,0.78858894,0.000024405264],"about_ca_topic_score_codex":0.002608291,"about_ca_topic_score_gemma":0.0024483104,"teacher_disagreement_score":0.051573068,"about_ca_system_score_codex":0.0011020929,"about_ca_system_score_gemma":0.00036757643,"threshold_uncertainty_score":0.1725291},"labels":[],"label_agreement":null},{"id":"W2005520311","doi":"10.1109/epec.2011.6070189","title":"Novel constrained search-tactic for optimal dynamic economic dispatch using modern meta-heuristic optimization algorithms","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Mathematical optimization; Computer science; Heuristic; Economic dispatch; Optimization problem; Maxima and minima; Algorithm; Mathematics; Electric power system; Power (physics)","score_opus":0.05662815491312447,"score_gpt":0.255235313737485,"score_spread":0.1986071588243605,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005520311","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008652711,0.00018340816,0.9874844,0.00009357894,0.000023598579,0.000073510164,0.000023893883,0.00011017537,0.003354697],"genre_scores_gemma":[0.4091342,0.00031434698,0.5869766,0.00014627013,0.000044538072,0.00066418,0.00011907995,0.00008725171,0.0025134797],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996737,0.00013672911,0.000020238485,0.000030027324,0.00011704969,0.00002229816],"domain_scores_gemma":[0.9994555,0.00032917876,0.00005643439,0.000045468772,0.000092612565,0.000020764617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090974744,0.00084680243,0.0009041766,0.0007784327,0.00041073773,0.0007724105,0.0011683812,0.0011182037,0.0019371851],"category_scores_gemma":[0.0020416307,0.0004490191,0.0006441621,0.0010200178,0.00051059,0.0007613904,0.0008233273,0.00085671816,0.00025161944],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030313973,0.000030825373,0.00016457475,0.000049013586,0.000035784666,0.000035979854,0.000030347639,0.9594502,0.00094296085,0.010860764,0.00052630214,0.027843067],"study_design_scores_gemma":[0.000008915029,0.0000102330105,0.000024660767,0.000004084884,0.0000030891924,0.0000066831767,0.0000022752788,0.99821377,0.00016713966,0.001236613,0.00032046056,0.0000021361732],"about_ca_topic_score_codex":0.0035846564,"about_ca_topic_score_gemma":0.003504186,"teacher_disagreement_score":0.0035846564,"about_ca_system_score_codex":0.0005008512,"about_ca_system_score_gemma":0.0010095196,"threshold_uncertainty_score":0.007127583},"labels":[],"label_agreement":null},{"id":"W2006900625","doi":"10.1109/pesmg.2013.6672570","title":"A novel market simulation methodology on hydro storage","year":2013,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bidding; Economic dispatch; Electricity market; Computer science; Power system simulation; Production (economics); Energy storage; Hydroelectricity; Energy market; Environmental economics; Operations research; Electricity; Reliability engineering; Electric power system; Economics; Microeconomics; Engineering; Electrical engineering","score_opus":0.03192424632170907,"score_gpt":0.2542517156168132,"score_spread":0.22232746929510414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2006900625","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006926108,0.00003783112,0.9844263,0.00007366243,0.000039917708,0.000093208124,0.000098309945,0.00033532068,0.00796928],"genre_scores_gemma":[0.39844054,0.0002709187,0.59042954,0.00011463656,0.000063830776,0.000704685,0.00031324144,0.0003132489,0.009349442],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961853,0.00018043409,0.000019317593,0.000044254524,0.00011001718,0.000027505579],"domain_scores_gemma":[0.99943334,0.00030103946,0.000051537158,0.000059104324,0.00012940916,0.000025463229],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008694209,0.0005665152,0.0005499783,0.00043158277,0.00041654095,0.00088480744,0.001300551,0.0006305391,0.006727411],"category_scores_gemma":[0.0017348414,0.00034559058,0.00071667106,0.00058452203,0.0003928834,0.0012446885,0.0008084795,0.0008481656,0.00060494285],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017245959,0.000035886944,0.00023893816,0.000041555093,0.000031385232,0.00007634118,0.00004306984,0.91427374,0.0016220978,0.06896201,0.00087817776,0.013779608],"study_design_scores_gemma":[0.0000048591987,0.0000062903932,0.000017351149,0.0000028123795,0.0000025988911,0.000007810475,0.000004552626,0.99385947,0.00023906675,0.0041521825,0.0017008475,0.000002202365],"about_ca_topic_score_codex":0.004043434,"about_ca_topic_score_gemma":0.0042909025,"teacher_disagreement_score":0.006727411,"about_ca_system_score_codex":0.0006688034,"about_ca_system_score_gemma":0.0011698495,"threshold_uncertainty_score":0.022505403},"labels":[],"label_agreement":null},{"id":"W2010392324","doi":"10.1016/j.enpol.2011.03.008","title":"Characteristics of the prices of operating reserves and regulation services in competitive electricity markets","year":2011,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Volatility (finance); Electricity; Economics; Predictability; Monetary economics; Electricity market; Agricultural economics; Business; Econometrics","score_opus":0.0061379765347969704,"score_gpt":0.18881686392320177,"score_spread":0.1826788873884048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2010392324","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9830089,0.00016706143,0.009318593,0.00046528308,0.000021342667,0.00003744476,0.0004764226,0.00007222383,0.00643265],"genre_scores_gemma":[0.9986462,0.000032594467,0.00060771516,0.000019143106,0.000014402014,0.000008038389,0.00016629099,0.000018140203,0.00048749486],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.998885,0.0003137804,0.000084161795,0.0001320287,0.0003439512,0.00024113276],"domain_scores_gemma":[0.9497111,0.041132018,0.0050278,0.0006872433,0.0023504372,0.0010914002],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032933205,0.00022314195,0.00064364605,0.00096437806,0.00039589603,0.002337689,0.0008171927,0.00093660183,0.0043135593],"category_scores_gemma":[0.0351017,0.00056469813,0.00046326683,0.0011206078,0.0008187349,0.0022476804,0.00033804725,0.0011119028,0.000333383],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.004578989,0.00063519424,0.115273215,0.00034474558,0.00031349598,0.0022409216,0.0008517397,0.56202453,0.01897878,0.24952663,0.009389062,0.035842735],"study_design_scores_gemma":[0.00014343836,0.00035171089,0.09015976,0.000022753955,0.000056268742,0.00083885173,0.0005873456,0.85191685,0.0030887616,0.05144609,0.0012911682,0.000096990574],"about_ca_topic_score_codex":0.002265807,"about_ca_topic_score_gemma":0.002296867,"teacher_disagreement_score":0.0043135593,"about_ca_system_score_codex":0.001340978,"about_ca_system_score_gemma":0.00078672374,"threshold_uncertainty_score":0.017416954},"labels":[],"label_agreement":null},{"id":"W2010879375","doi":"10.1016/j.eneco.2004.12.004","title":"Governance of electricity transmission systems","year":2005,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Natural monopoly; Corporate governance; Electricity; Operator (biology); Industrial organization; Profit (economics); Monopoly; Electricity system; Economics; Transmission system; Business; Microeconomics; Transmission (telecommunications); Operations research; Computer science; Electricity generation; Finance; Engineering; Telecommunications","score_opus":0.003216012089685772,"score_gpt":0.15238361377786738,"score_spread":0.1491676016881816,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2010879375","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38769847,0.0019876203,0.16627523,0.022840925,0.00030265143,0.00014607847,0.00050166564,0.0001994861,0.42004797],"genre_scores_gemma":[0.98934245,0.00040269017,0.0014865907,0.00015232619,0.000073346244,0.000025964113,0.000041132294,0.000010600189,0.008464804],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9988373,0.00058060006,0.000039645754,0.00018498994,0.0001695772,0.00018787534],"domain_scores_gemma":[0.9982948,0.00068098196,0.00034315052,0.00027869834,0.0002361331,0.00016635236],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013216636,0.0001970542,0.00032072517,0.00038045424,0.0005179834,0.0037233233,0.00040035375,0.0009012827,0.0047224956],"category_scores_gemma":[0.0057349405,0.00019583371,0.00018941032,0.0005918175,0.001527778,0.0020869612,0.00085809524,0.0010013736,0.00028358446],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009558726,0.000017738044,0.0017329683,0.000012616987,0.000013825331,0.000067578614,0.00015539458,0.018360185,0.00023110441,0.9688116,0.0028708836,0.0077165277],"study_design_scores_gemma":[0.000011494433,0.000011944184,0.0024056737,0.000020482546,0.000007935022,0.00003179098,0.00023745163,0.022402452,0.00015491669,0.96152383,0.013184701,0.0000073629226],"about_ca_topic_score_codex":0.002881917,"about_ca_topic_score_gemma":0.0033884274,"teacher_disagreement_score":0.0047224956,"about_ca_system_score_codex":0.0014723466,"about_ca_system_score_gemma":0.0016609771,"threshold_uncertainty_score":0.01579833},"labels":[],"label_agreement":null},{"id":"W2011019406","doi":"10.1109/nabic.2013.6617874","title":"A novel application of ACO to price transmission rights in electricity markets","year":2013,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Electricity market; Electricity; Volatility (finance); Hedge; Business; Economics; Electricity retailing; Microeconomics; Econometrics; Engineering","score_opus":0.0029780007330158695,"score_gpt":0.18362255980515355,"score_spread":0.18064455907213767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2011019406","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06777876,0.0004485824,0.90594584,0.00059020345,0.00019557138,0.0001688333,0.000097772405,0.00040338715,0.024371115],"genre_scores_gemma":[0.6429686,0.0003062024,0.34987462,0.00016699822,0.00008734461,0.00012271415,0.00009306337,0.00006939548,0.006311114],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999724,0.00008689959,0.000014636559,0.00005110698,0.00008736776,0.00003593802],"domain_scores_gemma":[0.9994431,0.0002965205,0.000066634544,0.00004979686,0.00010695179,0.00003699431],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004165467,0.00041291167,0.0006506596,0.00048876385,0.00038873887,0.0007724097,0.0011144935,0.0010974716,0.002088802],"category_scores_gemma":[0.0017926294,0.00026557874,0.0005582625,0.0007525943,0.0004654069,0.0006241728,0.0005604308,0.00064050104,0.00025235294],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006450221,0.00013298115,0.0012809826,0.00007974392,0.00006121845,0.00022237551,0.00004556672,0.90994555,0.0032575133,0.021894483,0.0015134512,0.06150153],"study_design_scores_gemma":[0.000010306205,0.000016482089,0.000090459864,0.0000027221356,0.0000043809014,0.000034987246,0.000004564244,0.99687576,0.0002002128,0.002188392,0.0005688637,0.000002882204],"about_ca_topic_score_codex":0.0047170483,"about_ca_topic_score_gemma":0.0047473465,"teacher_disagreement_score":0.0047170483,"about_ca_system_score_codex":0.00040789414,"about_ca_system_score_gemma":0.0008755395,"threshold_uncertainty_score":0.009379208},"labels":[],"label_agreement":null},{"id":"W2015533199","doi":"10.1109/epec.2011.6070190","title":"Multi-objective short-term hydro-thermal scheduling using bacterial foraging algorithm","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Foraging; Mathematical optimization; Scheduling (production processes); Computer science; Job shop scheduling; Optimization problem; Term (time); Minification; Algorithm; Mathematics; Ecology; Schedule; Biology","score_opus":0.026151161165590714,"score_gpt":0.23245962574863868,"score_spread":0.20630846458304797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2015533199","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05127816,0.0009800406,0.94138896,0.00031422358,0.000087917615,0.00010584742,0.00006813433,0.00028858188,0.005488098],"genre_scores_gemma":[0.7349265,0.0006760275,0.2589338,0.00015010824,0.00005201274,0.0004532831,0.00018172801,0.00006090819,0.0045655775],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99963987,0.00012517477,0.000018670233,0.000058592195,0.000106173684,0.00005144899],"domain_scores_gemma":[0.99962425,0.00020211186,0.000049759266,0.0000144003725,0.00007631227,0.000033178283],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073662016,0.00092524034,0.0013828732,0.00046158297,0.00047974905,0.000696846,0.0009457222,0.0012088876,0.0015082691],"category_scores_gemma":[0.001102438,0.00049483054,0.0008173956,0.0005536281,0.00044304255,0.00058675953,0.00070218847,0.000770418,0.0002163967],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021300879,0.000017109194,0.00016731732,0.00003270372,0.000023949497,0.000026512254,0.000016849579,0.9895091,0.00069418864,0.0014442727,0.00020128062,0.00784538],"study_design_scores_gemma":[0.0000074330937,0.00001624099,0.0000397832,0.0000038210546,0.0000039354995,0.0000046923055,0.0000036785043,0.99904686,0.00010063265,0.00059034186,0.00018022241,0.0000022474799],"about_ca_topic_score_codex":0.0071980297,"about_ca_topic_score_gemma":0.0041837315,"teacher_disagreement_score":0.0071980297,"about_ca_system_score_codex":0.00077581155,"about_ca_system_score_gemma":0.0014803404,"threshold_uncertainty_score":0.014312267},"labels":[],"label_agreement":null},{"id":"W2015748770","doi":"10.1049/iet-gtd.2013.0766","title":"Fast security and risk constrained probabilistic unit commitment method using triangular approximate distribution model of wind generators","year":2014,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Power system simulation; Probabilistic logic; Wind power; Mathematical optimization; Computer science; Unit (ring theory); Reliability engineering; Mathematics; Engineering; Electrical engineering; Electric power system; Artificial intelligence; Physics; Power (physics)","score_opus":0.017285788508731442,"score_gpt":0.23857750793710508,"score_spread":0.22129171942837364,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2015748770","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010721482,0.00015532713,0.9848284,0.00013545481,0.000027811806,0.000041075207,0.00006467155,0.00016974164,0.0038559882],"genre_scores_gemma":[0.7319254,0.00039385873,0.26121205,0.00009792058,0.00003956356,0.00027650548,0.00026432553,0.000119402925,0.00567096],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972993,0.00011270608,0.000009520379,0.000033435626,0.000084382205,0.000030048779],"domain_scores_gemma":[0.9996395,0.00021036842,0.00003461494,0.00002381756,0.00007440578,0.000017416245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005121571,0.0005540514,0.0008479588,0.00022659462,0.0003655001,0.00068508805,0.0009885931,0.0005673354,0.0035675534],"category_scores_gemma":[0.0010119076,0.00040363905,0.0005097429,0.000660887,0.00029325986,0.00071182026,0.00047551602,0.0009955785,0.0004482908],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017403509,0.0000062501886,0.000099636985,0.000018765673,0.000008889962,0.000023731583,0.000011913545,0.98505324,0.0002589474,0.0034285188,0.00037527859,0.010697414],"study_design_scores_gemma":[0.0000015432314,0.0000033985382,0.000012119994,9.667322e-7,8.087933e-7,0.00000394755,0.0000016764947,0.99926585,0.00003407289,0.0005792902,0.000095452495,8.235977e-7],"about_ca_topic_score_codex":0.008328722,"about_ca_topic_score_gemma":0.008062404,"teacher_disagreement_score":0.008328722,"about_ca_system_score_codex":0.0005387733,"about_ca_system_score_gemma":0.0010835985,"threshold_uncertainty_score":0.016560495},"labels":[],"label_agreement":null},{"id":"W2016141565","doi":"10.1177/1748006x11419071","title":"Value of stochastic reserve policies in low-carbon power systems","year":2011,"lang":"en","type":"article","venue":"Proceedings of the Institution of Mechanical Engineers Part O Journal of Risk and Reliability","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Pratt and Whitney Canada","keywords":"Reserve requirement; Wind power; Electric power system; Wind generator; Reliability engineering; Environmental economics; Computer science; Power system simulation; Electricity generation; Scheduling (production processes); Environmental science; Business; Power (physics); Operations management; Electrical engineering; Engineering; Economics","score_opus":0.00741985161677194,"score_gpt":0.19234960535860088,"score_spread":0.18492975374182893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2016141565","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6415131,0.0026253676,0.32044137,0.0035742202,0.00026249432,0.00011654637,0.00046447653,0.0006397666,0.030362781],"genre_scores_gemma":[0.9971353,0.00017526104,0.0020346872,0.000029206522,0.000014508152,0.0000100480665,0.000025199697,0.000016020345,0.0005598665],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99905974,0.00053467415,0.000035758098,0.000078665915,0.00017025527,0.00012092288],"domain_scores_gemma":[0.993233,0.0052959085,0.0006109966,0.00019198726,0.0004426564,0.00022543901],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027217928,0.0007452836,0.0010805421,0.0005262443,0.0006862332,0.0018811407,0.00084655435,0.0010355636,0.0023589379],"category_scores_gemma":[0.010552003,0.00051836006,0.00041443505,0.0005106922,0.0012493933,0.0015927084,0.00076818094,0.0009948167,0.00013195073],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006937467,0.000010814066,0.00022111424,0.000019215347,0.0000131582265,0.000054148357,0.00000831683,0.98703194,0.00017017563,0.010574022,0.00018194798,0.0016457748],"study_design_scores_gemma":[0.000015590005,0.000038625614,0.00016213584,0.0000062421514,0.0000088035495,0.000014670057,0.0000132689875,0.9878169,0.00011667086,0.011663583,0.00013715144,0.000006318901],"about_ca_topic_score_codex":0.004180914,"about_ca_topic_score_gemma":0.002923205,"teacher_disagreement_score":0.004180914,"about_ca_system_score_codex":0.001795879,"about_ca_system_score_gemma":0.0013889114,"threshold_uncertainty_score":0.014394343},"labels":[],"label_agreement":null},{"id":"W2016836399","doi":"10.1016/j.energy.2014.01.059","title":"Influence of wind power on hourly electricity prices and GHG (greenhouse gas) emissions: Evidence that congestion matters from Ontario zonal data","year":2014,"lang":"en","type":"article","venue":"Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":60,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université de Sherbrooke; HEC Montréal","funders":"","keywords":"Greenhouse gas; Wind power; Electricity; Environmental science; Economics; Wind speed; Natural resource economics; Production (economics); Econometrics; Meteorology; Microeconomics; Engineering; Geography","score_opus":0.01557452695277647,"score_gpt":0.20874105119433087,"score_spread":0.1931665242415544,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2016836399","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97491825,0.0006094958,0.0002847451,0.0009049499,0.000018678356,0.000016377619,0.011836363,0.000018100456,0.011392948],"genre_scores_gemma":[0.9940499,0.00033386593,0.00010062777,0.00005013606,0.000010358788,0.000004656616,0.0037158194,0.0000078372905,0.0017269506],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999361,0.00016350915,0.000035540583,0.00008598202,0.0002316722,0.00012232238],"domain_scores_gemma":[0.99340844,0.0023522743,0.0015148519,0.0005031207,0.0017745426,0.00044675602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007583282,0.00014727032,0.00021897242,0.0006026999,0.00077540503,0.0010924985,0.00040372467,0.00030417423,0.002938719],"category_scores_gemma":[0.006593603,0.00022865662,0.00041040522,0.0031340537,0.00066193874,0.0005896568,0.0003453831,0.00033505136,0.00025692387],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002938434,0.000021622696,0.98766834,0.000051275525,0.00021484002,0.00013330512,0.0004711364,0.0027214547,0.00037733262,0.00055531284,0.0037308792,0.0037606233],"study_design_scores_gemma":[0.000009398046,0.0000077352315,0.9965753,0.000010089817,0.000048960625,0.000013543347,0.00028095258,0.0008350677,0.00007605593,0.00007606913,0.0020593645,0.0000074653726],"about_ca_topic_score_codex":0.966123,"about_ca_topic_score_gemma":0.98482794,"teacher_disagreement_score":0.033877015,"about_ca_system_score_codex":0.005799625,"about_ca_system_score_gemma":0.0049850782,"threshold_uncertainty_score":0.068152964},"labels":[],"label_agreement":null},{"id":"W2016956342","doi":"10.2316/journal.203.2009.3.203-4504","title":"MODELS FOR SECURITY INVESTMENT IN ELECTRICITY MARKET","year":2009,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Investment (military); Incentive; Business; Electricity; Electricity market; Control (management); Public investment; Industrial organization; Market economy; Economics; Economic policy; Engineering","score_opus":0.005102314378856715,"score_gpt":0.20598013100045018,"score_spread":0.20087781662159346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2016956342","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14864391,0.0048103617,0.6308084,0.015263047,0.0003498428,0.0003095666,0.0014976368,0.00034260604,0.19797455],"genre_scores_gemma":[0.9349345,0.002502656,0.015489653,0.00035012708,0.00021063928,0.00034338905,0.0002414185,0.000050467916,0.045877103],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989372,0.0005662986,0.000032429933,0.00012266013,0.00014632358,0.0001951475],"domain_scores_gemma":[0.9984139,0.0009197849,0.00025975984,0.000095523304,0.00012245707,0.00018854007],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018427524,0.0013959236,0.0012419546,0.0008571041,0.0010105565,0.003425809,0.002654714,0.0046447925,0.011072041],"category_scores_gemma":[0.003734927,0.0005865859,0.0012130967,0.0011844238,0.0021215917,0.004189246,0.0013931281,0.0025032642,0.00092772255],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004226502,0.00004663771,0.00022825689,0.000041631036,0.00002091827,0.00011472366,0.00007609292,0.18150252,0.00020597666,0.8139761,0.002009567,0.001735386],"study_design_scores_gemma":[0.000106025545,0.000056117016,0.00023360494,0.000029512483,0.000022346578,0.00006876276,0.00007572862,0.50289214,0.00008465582,0.49241713,0.0039867093,0.000027401333],"about_ca_topic_score_codex":0.0041383915,"about_ca_topic_score_gemma":0.004346206,"teacher_disagreement_score":0.011072041,"about_ca_system_score_codex":0.0030113067,"about_ca_system_score_gemma":0.0011957729,"threshold_uncertainty_score":0.037039638},"labels":[],"label_agreement":null},{"id":"W2017416224","doi":"10.2316/journal.201.2007.1.201-1642","title":"APPLICATION OF PARTICLE SWARM OPTIMIZATION ALGORITHM FOR OPTIMAL REACTIVE POWER PLANNING","year":2007,"lang":"en","type":"article","venue":"Control and Intelligent Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Particle swarm optimization; Mathematical optimization; AC power; Minification; Computer science; Linear programming; Multi-swarm optimization; Transformer; Evolutionary programming; Optimization problem; Evolutionary algorithm; Mathematics; Engineering; Voltage","score_opus":0.007258623215638201,"score_gpt":0.22938722407067524,"score_spread":0.22212860085503705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2017416224","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006554921,0.00040747988,0.98752916,0.00019328443,0.000058291498,0.000024610345,0.000014139339,0.00019601935,0.00502209],"genre_scores_gemma":[0.55521935,0.0010402258,0.43806705,0.000110123445,0.00010987482,0.0001714901,0.00009908676,0.00008861808,0.005094266],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972004,0.00011615017,0.000013432156,0.000036529666,0.00009679402,0.000017041873],"domain_scores_gemma":[0.99974924,0.00015188279,0.000020624417,0.000015645823,0.00005528283,0.000007261411],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051400013,0.0005238236,0.0006332286,0.00040891752,0.00029097975,0.00061631214,0.0004338312,0.0006171403,0.0011818875],"category_scores_gemma":[0.0012539398,0.00028644633,0.00031522496,0.0004667495,0.0003185348,0.0004930562,0.0003252677,0.00054600264,0.00026605724],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035562796,0.000027058517,0.00035473122,0.000047174868,0.000030025261,0.000054069445,0.000036430076,0.9065938,0.0014519657,0.012710399,0.001373328,0.07728552],"study_design_scores_gemma":[0.000007449522,0.000009936357,0.000045181372,0.0000029194205,0.0000031125478,0.0000073198503,0.0000025483655,0.997145,0.00027094764,0.0016747366,0.0008287934,0.0000020355549],"about_ca_topic_score_codex":0.003961371,"about_ca_topic_score_gemma":0.0023279695,"teacher_disagreement_score":0.003961371,"about_ca_system_score_codex":0.0003483792,"about_ca_system_score_gemma":0.00057566096,"threshold_uncertainty_score":0.007876635},"labels":[],"label_agreement":null},{"id":"W2019841235","doi":"10.1109/epec.2010.5697200","title":"Fixed-head hydro-thermal scheduling using a modified bacterial foraging algorithm","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Foraging; Mathematical optimization; Computer science; Scheduling (production processes); Job shop scheduling; Dimension (graph theory); Nonlinear system; Optimization problem; Convergence (economics); Algorithm; Mathematics; Ecology","score_opus":0.01124913720223942,"score_gpt":0.22611204512471403,"score_spread":0.21486290792247462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2019841235","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050672762,0.00025907875,0.9446035,0.00014387362,0.00005812876,0.000073979885,0.000034497185,0.00027448434,0.0038797122],"genre_scores_gemma":[0.67942107,0.00017430155,0.31725833,0.000049167153,0.000024505756,0.00021349212,0.00006345679,0.000058333502,0.002737308],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99978596,0.000079410616,0.000009236578,0.000026957257,0.00007343105,0.000025093164],"domain_scores_gemma":[0.9997248,0.00014175709,0.00003893661,0.000018254219,0.000054879427,0.0000214],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039584283,0.00051471835,0.00066461926,0.0003057521,0.00037801758,0.00039281746,0.00082882354,0.0006728169,0.001271654],"category_scores_gemma":[0.0010139521,0.00027398014,0.00042801438,0.00036094448,0.0003804316,0.00042401266,0.00039955406,0.00044218538,0.00021037435],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046152272,0.000020213649,0.00020330951,0.000023105016,0.000017797393,0.00002420533,0.00002283799,0.97153676,0.0022437216,0.0022105768,0.00030226485,0.023349026],"study_design_scores_gemma":[0.000011510395,0.000022765582,0.000057215962,0.000002103799,0.0000026837934,0.000006950152,0.000003442416,0.99873644,0.00032012575,0.0004958964,0.00033810132,0.000002756647],"about_ca_topic_score_codex":0.0067044096,"about_ca_topic_score_gemma":0.004463309,"teacher_disagreement_score":0.0067044096,"about_ca_system_score_codex":0.0005663289,"about_ca_system_score_gemma":0.0010429526,"threshold_uncertainty_score":0.013330817},"labels":[],"label_agreement":null},{"id":"W2021620876","doi":"10.1109/tste.2012.2225078","title":"Sensitivity-Indices-Based Risk Assessment of Large-Scale Solar PV Investment Projects","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Photovoltaic system; Sensitivity (control systems); Profit (economics); Monte Carlo method; Environmental economics; Solar power; Solar energy; Karush–Kuhn–Tucker conditions; Reliability engineering; Mathematical optimization; Econometrics; Computer science; Microeconomics; Economics; Engineering; Mathematics; Power (physics); Electrical engineering; Electronic engineering; Statistics","score_opus":0.00566346111631379,"score_gpt":0.22336411073170565,"score_spread":0.21770064961539184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2021620876","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7482822,0.0003320097,0.24312232,0.00025787126,0.000024668287,0.00014541033,0.00021353114,0.00011891623,0.0075029754],"genre_scores_gemma":[0.99515015,0.00004828946,0.0045577586,0.00000811803,0.0000030279568,0.000015099282,0.000036578844,0.0000051900024,0.00017567241],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998451,0.0008930671,0.00006231198,0.00012231011,0.0003636614,0.000107605505],"domain_scores_gemma":[0.9917543,0.006640269,0.00080138457,0.00026035268,0.00039504617,0.00014870496],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004662951,0.00088552514,0.00064166007,0.0014662944,0.00025388054,0.0012255843,0.00071555626,0.0008014808,0.00061478856],"category_scores_gemma":[0.0120563805,0.0005003161,0.00078056194,0.00097612006,0.000720323,0.0011388796,0.0011200795,0.0007920114,0.000050072427],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028039325,0.00001163204,0.0011389273,0.000007889525,0.000021637108,0.00003709729,0.000008852085,0.9958683,0.00033658263,0.0010451839,0.000032448672,0.0014635299],"study_design_scores_gemma":[0.0000018352962,0.000019476494,0.000930228,0.0000028686927,0.000005864234,0.0000127340745,0.000008521245,0.99751955,0.0004017349,0.0010627275,0.00002796533,0.0000063894436],"about_ca_topic_score_codex":0.0042934907,"about_ca_topic_score_gemma":0.0024391587,"teacher_disagreement_score":0.004662951,"about_ca_system_score_codex":0.0016665632,"about_ca_system_score_gemma":0.0006906639,"threshold_uncertainty_score":0.02466029},"labels":[],"label_agreement":null},{"id":"W2023750756","doi":"10.1109/pesgm.2014.6939256","title":"Energy storage in an open electricity market with contribution to transmission congestion relief","year":2014,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Energy storage; Computer science; Integer programming; Electricity; Linear programming; Electricity market; Mathematical optimization; Compressed air energy storage; Transmission (telecommunications); Economic dispatch; Energy (signal processing); Operations research; Electric power system; Power (physics); Engineering; Telecommunications; Electrical engineering","score_opus":0.004180332420500499,"score_gpt":0.20066075413560647,"score_spread":0.19648042171510596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2023750756","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20863847,0.0003768378,0.77881265,0.0005224077,0.00009253109,0.00015903312,0.00016297535,0.00031676382,0.010918372],"genre_scores_gemma":[0.970116,0.00008211686,0.02742932,0.000026326268,0.000017189268,0.00004761714,0.000043885462,0.000012991436,0.0022244272],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976975,0.000083779996,0.000011228855,0.000043164553,0.000045810164,0.000046289733],"domain_scores_gemma":[0.99956435,0.0002413299,0.00007364913,0.000020762343,0.000058306672,0.00004158832],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006874393,0.00056220946,0.00081091956,0.000322074,0.0003883126,0.001206411,0.00076568,0.00073716685,0.0020037128],"category_scores_gemma":[0.0010545448,0.00036504582,0.00028776925,0.00039649542,0.00051656814,0.00124641,0.00076234655,0.0005987561,0.00012410732],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008399059,0.000031439573,0.00023053939,0.000021024596,0.000010122841,0.00008980454,0.000012856517,0.984089,0.00072001526,0.0059260684,0.00027966974,0.00850535],"study_design_scores_gemma":[0.000008483696,0.000017276232,0.000038151644,0.0000010332271,0.0000021860574,0.0000071948853,0.0000069638054,0.9983783,0.00013575375,0.0012869295,0.00011605989,0.0000015677673],"about_ca_topic_score_codex":0.0033258689,"about_ca_topic_score_gemma":0.0048690964,"teacher_disagreement_score":0.0033258689,"about_ca_system_score_codex":0.0006270966,"about_ca_system_score_gemma":0.0010942015,"threshold_uncertainty_score":0.006703019},"labels":[],"label_agreement":null},{"id":"W2024486074","doi":"10.2202/1553-779x.1255","title":"Radial System Reconfiguration to Minimize Operating Costs in Markets","year":2007,"lang":"en","type":"article","venue":"International Journal of Emerging Electric Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"AC power; Clearing; Market clearing; Electric power system; Control reconfiguration; Reliability engineering; Power (physics); Computer science; Business; Voltage; Electrical engineering; Economics; Engineering; Finance; Microeconomics; Embedded system","score_opus":0.005134573617110478,"score_gpt":0.23490431849846954,"score_spread":0.22976974488135907,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2024486074","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1229187,0.00035400153,0.8659717,0.00014362154,0.000026350057,0.00007676173,0.000031014395,0.00073756825,0.009740332],"genre_scores_gemma":[0.9104831,0.00010499592,0.08715416,0.000021559805,0.0000294277,0.00005408516,0.00002393409,0.00006467766,0.0020640455],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99963117,0.00016079519,0.000014714552,0.00004568607,0.00010427072,0.00004346779],"domain_scores_gemma":[0.9995177,0.0002055633,0.000106986794,0.00007040751,0.00007737001,0.00002203683],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004997003,0.0005361885,0.0005950196,0.0004994272,0.00029332138,0.00063619483,0.00081165246,0.00048327915,0.0017258675],"category_scores_gemma":[0.001366058,0.00021533937,0.00018992755,0.00049683044,0.00024768233,0.00089353713,0.00035369207,0.00031257828,0.00026027104],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021351366,0.00012434914,0.0005959454,0.00009758294,0.000035532466,0.00015581907,0.00010502802,0.7681202,0.019305998,0.016496906,0.0016880514,0.19306101],"study_design_scores_gemma":[0.000023512006,0.000108210734,0.00030585658,0.000004321796,0.000011102748,0.00013096546,0.000022423847,0.99007577,0.0044737975,0.0034584182,0.0013775891,0.000007935821],"about_ca_topic_score_codex":0.00056169793,"about_ca_topic_score_gemma":0.001105277,"teacher_disagreement_score":0.0017258675,"about_ca_system_score_codex":0.00047836726,"about_ca_system_score_gemma":0.00028071474,"threshold_uncertainty_score":0.0057736635},"labels":[],"label_agreement":null},{"id":"W2024489591","doi":"10.1109/5.824000","title":"Competition and system stability-the reward and the penalty","year":2000,"lang":"en","type":"article","venue":"Proceedings of the IEEE","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Sanctions; Competition (biology); Industrial organization; Electric power system; Electricity; Value (mathematics); Market power; Fragmentation (computing); Business; Electricity market; Risk analysis (engineering); Microeconomics; Economics; Computer science; Power (physics); Engineering; Monopoly; Electrical engineering","score_opus":0.003617781442454254,"score_gpt":0.15005665720419967,"score_spread":0.1464388757617454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2024489591","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20282175,0.003993757,0.627263,0.018337786,0.0006740349,0.000085681095,0.00019239236,0.00029629984,0.14633533],"genre_scores_gemma":[0.9872961,0.0004736034,0.006374884,0.000163906,0.00010627269,0.000027998738,0.000014816792,0.00004204375,0.0055003725],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9968375,0.0015775491,0.00008504669,0.0003070425,0.0007388171,0.0004540673],"domain_scores_gemma":[0.98926544,0.007614378,0.0009501081,0.0006158439,0.00096849457,0.00058578193],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034487233,0.0005378751,0.00086931646,0.0006047578,0.0010545859,0.0031500598,0.0007073693,0.0014996942,0.0058773756],"category_scores_gemma":[0.020164091,0.00022642121,0.0003419055,0.0007000233,0.005112082,0.0039269696,0.001886804,0.0019496008,0.00039658995],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011084436,0.000026517791,0.0009876173,0.000043780445,0.000022703858,0.00011299576,0.00013782732,0.11752489,0.00069130753,0.85650474,0.0018119678,0.022024743],"study_design_scores_gemma":[0.000027905257,0.00011083279,0.0012019381,0.000038893613,0.000008804475,0.00011483853,0.00016102317,0.18201514,0.00042445323,0.8115727,0.0042869486,0.000036621626],"about_ca_topic_score_codex":0.0019435142,"about_ca_topic_score_gemma":0.0017253328,"teacher_disagreement_score":0.0058773756,"about_ca_system_score_codex":0.0021976745,"about_ca_system_score_gemma":0.0021541847,"threshold_uncertainty_score":0.019661784},"labels":[],"label_agreement":null},{"id":"W2024587919","doi":"10.1109/pes.2010.5589559","title":"Unit commitment with wind generation accounting for transmission congestion","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Residual; Power system simulation; Mathematical optimization; Set (abstract data type); Schedule; Transmission (telecommunications); Computer science; Wind power; Upper and lower bounds; Power (physics); Electric power system; Engineering; Mathematics; Algorithm; Telecommunications; Electrical engineering","score_opus":0.01169954836860633,"score_gpt":0.21160370288705233,"score_spread":0.199904154518446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2024587919","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017845279,0.000204471,0.97362673,0.00025895296,0.00007561612,0.000047395457,0.00008935317,0.00022478151,0.007627397],"genre_scores_gemma":[0.8837004,0.0003902695,0.10748612,0.00008659312,0.00008834238,0.00013319255,0.00019536202,0.00016835028,0.0077514243],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896836,0.000510158,0.000033619126,0.00013626294,0.00024054649,0.00011110782],"domain_scores_gemma":[0.9989053,0.00064194034,0.00011147737,0.00014828162,0.00014286593,0.00005011719],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014474184,0.0010132205,0.0012754088,0.0003664264,0.000404077,0.0010295586,0.0016751784,0.0007201243,0.0032960235],"category_scores_gemma":[0.004390633,0.00058886746,0.00053228333,0.0009862774,0.00048436705,0.0015619991,0.0009002571,0.0014749707,0.00053606427],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016106134,0.0000067184674,0.00007440628,0.000011142483,0.000012977333,0.000032522872,0.000008756035,0.9814833,0.000121961995,0.010621556,0.00037693908,0.007233701],"study_design_scores_gemma":[0.0000033603123,0.0000053945246,0.00001928143,0.0000017886457,0.0000029062228,0.000005665098,0.0000021373016,0.99543756,0.00006593534,0.00425588,0.00019784612,0.000002246976],"about_ca_topic_score_codex":0.00496793,"about_ca_topic_score_gemma":0.0055816746,"teacher_disagreement_score":0.00496793,"about_ca_system_score_codex":0.0007832742,"about_ca_system_score_gemma":0.0013938062,"threshold_uncertainty_score":0.011026263},"labels":[],"label_agreement":null},{"id":"W2024667849","doi":"10.1109/syscon.2012.6189540","title":"Optimal dynamic economic dispatch including renewable energy source using artificial bee colony algorithm","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Economic dispatch; Renewable energy; Electric power system; Mathematical optimization; Computer science; Electricity; Artificial bee colony algorithm; Electricity generation; Demand response; Population; Power (physics); Engineering; Mathematics; Electrical engineering","score_opus":0.012574548347436534,"score_gpt":0.22879522166351138,"score_spread":0.21622067331607484,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2024667849","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.084067844,0.0006953495,0.89746714,0.00048510428,0.000118647666,0.0001407045,0.00011020078,0.0003614082,0.016553659],"genre_scores_gemma":[0.8922006,0.00028845057,0.10321718,0.000066991364,0.00003464133,0.00017800521,0.0001277968,0.000051551477,0.003834866],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997987,0.00008228621,0.000010517558,0.000027110487,0.000055297485,0.000026082844],"domain_scores_gemma":[0.99969256,0.00016755912,0.00003921267,0.000015316633,0.000065943495,0.000019515423],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047362287,0.0007432703,0.0011169071,0.00053250534,0.00033967433,0.0008856036,0.0007192138,0.0008365202,0.0016563461],"category_scores_gemma":[0.0011104711,0.00034068958,0.00046418427,0.0005997973,0.00033048211,0.0006020327,0.00043851061,0.00057344715,0.0001819357],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018065348,0.000017202996,0.000117390955,0.000016905757,0.000012902314,0.000024326302,0.000008250357,0.98921865,0.00035683563,0.0018794584,0.00033461652,0.007995381],"study_design_scores_gemma":[0.000005981652,0.000006714073,0.000025192632,0.0000012080257,0.0000018247044,0.0000023467662,0.000001806622,0.9993906,0.00004954683,0.00041318356,0.00010036435,0.0000012897217],"about_ca_topic_score_codex":0.0067164265,"about_ca_topic_score_gemma":0.0049812933,"teacher_disagreement_score":0.0067164265,"about_ca_system_score_codex":0.0005878124,"about_ca_system_score_gemma":0.00088517845,"threshold_uncertainty_score":0.013354659},"labels":[],"label_agreement":null},{"id":"W2026353558","doi":"10.1109/sege.2013.6707918","title":"Long-term system operational impacts of wind generation penetration in Ontario power system","year":2013,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Electricity generation; Environmental science; Grid; Monte Carlo method; Electric power system; Wind speed; Distributed generation; Meteorology; Renewable energy; Computer science; Engineering; Power (physics); Electrical engineering","score_opus":0.00783378005044173,"score_gpt":0.18354406521868558,"score_spread":0.17571028516824386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2026353558","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99481344,0.00007783598,0.0008175307,0.00012641969,0.000003302064,0.000009618086,0.0004000811,0.000017672155,0.0037342163],"genre_scores_gemma":[0.99911886,0.000054267184,0.00015594206,0.000005309987,6.4647065e-7,0.0000028966729,0.00013021447,0.0000025236523,0.0005293234],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998336,0.000043472446,0.0000074956324,0.00001772514,0.00004303602,0.000054704484],"domain_scores_gemma":[0.9995239,0.00024156398,0.00008367014,0.000015253253,0.00010080713,0.000034908284],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033146626,0.00028601353,0.00017373155,0.00020783574,0.00049466384,0.0007321377,0.00036876308,0.00033760088,0.0011077652],"category_scores_gemma":[0.0011399547,0.00025064757,0.0002274841,0.00044787905,0.0005359511,0.0005298089,0.0002771457,0.00027594183,0.0000585055],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012269377,0.00002847463,0.043472648,0.000034473956,0.00003929345,0.0004966037,0.00011063126,0.948484,0.0017095788,0.0013509393,0.0005138501,0.0036367856],"study_design_scores_gemma":[0.000033436365,0.0001638343,0.112515494,0.000023281827,0.000075770695,0.000100742946,0.0006382252,0.8828705,0.0014079304,0.00087197026,0.0012606267,0.00003813625],"about_ca_topic_score_codex":0.7442823,"about_ca_topic_score_gemma":0.84623235,"teacher_disagreement_score":0.2557177,"about_ca_system_score_codex":0.008311371,"about_ca_system_score_gemma":0.0028994156,"threshold_uncertainty_score":0.51444733},"labels":[],"label_agreement":null},{"id":"W2027079130","doi":"10.2316/journal.203.2006.3.203-3364","title":"A BIBLIOGRAPHICAL SURVEY OF EVOLUTIONARY COMPUTATION APPLICATIONS IN POWER SYSTEMS (1994–2003)","year":2006,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computation; Electric power system; Computer science; Evolutionary computation; Power (physics); Operations research; Engineering; Artificial intelligence; Algorithm; Physics; Thermodynamics","score_opus":0.0054538968401171796,"score_gpt":0.2147619167965792,"score_spread":0.209308019956462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2027079130","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002842767,0.9034515,0.012752808,0.0021130715,0.0041762004,0.000060522707,0.0015865102,0.0003194502,0.07269714],"genre_scores_gemma":[0.0117820995,0.9454408,0.013745013,0.0010002794,0.002511807,0.000069092515,0.0023663351,0.00015166115,0.022932919],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99917954,0.00010731567,0.00017245363,0.00011801741,0.0003791893,0.000043510518],"domain_scores_gemma":[0.9970108,0.0012435107,0.00021693468,0.00014221172,0.0013082649,0.000078270146],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.000800153,0.0007320787,0.0009782806,0.022207763,0.0010385276,0.0025458229,0.0007204013,0.00081356,0.015608061],"category_scores_gemma":[0.005528342,0.0004550916,0.0005760421,0.05615469,0.00051385537,0.002310306,0.00084507914,0.0011109314,0.004135266],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043669435,0.000046862126,0.0008609739,0.008173727,0.00005886613,0.00012712317,0.00018414245,0.0015091567,0.0007380513,0.010776168,0.10943205,0.86804914],"study_design_scores_gemma":[0.0000048762818,0.000027854749,0.0023988949,0.0036343723,0.00006765506,0.00031601803,0.00008422572,0.0005379281,0.00051088067,0.0025774506,0.9898205,0.00001939358],"about_ca_topic_score_codex":0.007116258,"about_ca_topic_score_gemma":0.011957429,"teacher_disagreement_score":0.97779226,"about_ca_system_score_codex":0.0014274537,"about_ca_system_score_gemma":0.0031207856,"threshold_uncertainty_score":0.052214205},"labels":[],"label_agreement":null},{"id":"W2031547297","doi":"10.1111/1540-5982.t01-2-00004","title":"Decentralizing hydro power production","year":2003,"lang":"en","type":"article","venue":"Canadian Journal of Economics/Revue canadienne d économique","topic":"Electric Power System Optimization","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Production (economics); Hydropower; Inefficiency; Constraint (computer-aided design); Hydro power; Electricity; Competition (biology); Microeconomics; Electricity market; Power (physics); Hydroelectricity; Environmental economics; Economics; Natural resource economics; Environmental science; Water resource management; Engineering","score_opus":0.051645240989833266,"score_gpt":0.15410119363643374,"score_spread":0.10245595264660047,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2031547297","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3639728,0.0007047025,0.56701374,0.0021974742,0.00012565994,0.00013134119,0.0004265511,0.00030291916,0.06512472],"genre_scores_gemma":[0.9893757,0.00012353851,0.0057553044,0.000054853714,0.000025484105,0.00002914412,0.000030595864,0.000024401617,0.00458091],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99938667,0.00022867198,0.000014700715,0.00014623204,0.00009019075,0.00013355043],"domain_scores_gemma":[0.9990233,0.00043599596,0.00022226508,0.00012792744,0.000092014656,0.000098469936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007487458,0.00041925148,0.0007180544,0.00029695002,0.0003585619,0.0011744832,0.0005911773,0.00067441544,0.0065631177],"category_scores_gemma":[0.0027368197,0.00042257534,0.0005669227,0.0003924819,0.001188862,0.0016321812,0.0014274748,0.000788578,0.0004439007],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000876983,0.00004695737,0.0010234669,0.00006559774,0.000050443672,0.00015025785,0.00008611369,0.9016793,0.0019144717,0.08664732,0.0010370407,0.007211335],"study_design_scores_gemma":[0.00007744042,0.000098510005,0.0010022435,0.000020244335,0.00002573402,0.00007539063,0.00009516119,0.8789247,0.0005010634,0.11601847,0.003145091,0.000015930687],"about_ca_topic_score_codex":0.004275031,"about_ca_topic_score_gemma":0.004432126,"teacher_disagreement_score":0.995725,"about_ca_system_score_codex":0.0013489228,"about_ca_system_score_gemma":0.00094000524,"threshold_uncertainty_score":0.021955848},"labels":[],"label_agreement":null},{"id":"W2031999112","doi":"10.1111/j.1467-8292.2007.00346.x","title":"AGENCY COSTS OF THIRD‐PARTY FINANCING AND THE EFFECTS OF REGULATORY CHANGE ON UTILITY COSTS AND FACTOR CHOICES","year":2007,"lang":"en","type":"article","venue":"Annals of Public and Cooperative Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Restructuring; Agency cost; Agency (philosophy); Finance; Productivity; Business; Capital (architecture); Economics; Regulatory agency; Distribution (mathematics); Public economics; Industrial organization; Corporate governance; Shareholder; Macroeconomics","score_opus":0.03247087810434078,"score_gpt":0.2495447605205868,"score_spread":0.21707388241624603,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2031999112","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9654229,0.00049179,0.0015541377,0.0012655853,0.000011644182,0.00006567507,0.00029769886,0.000015530795,0.030875003],"genre_scores_gemma":[0.9976665,0.0000968993,0.00015695956,0.000027600447,0.000008036525,0.0000095845535,0.000038386064,0.0000025471998,0.0019933898],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9975625,0.00092893915,0.000115415285,0.00015657069,0.000455656,0.0007808104],"domain_scores_gemma":[0.9678353,0.017695948,0.009252118,0.0011994895,0.0027329938,0.0012841158],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003293161,0.00029928633,0.0004714165,0.00089249783,0.0009341954,0.0044123936,0.00071884523,0.0012345038,0.008262688],"category_scores_gemma":[0.023708396,0.000271696,0.000752061,0.0014910308,0.002133185,0.0017873343,0.0010210444,0.0015528247,0.0003254023],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0033077786,0.0013715985,0.55204785,0.00020245457,0.00041858086,0.0008925821,0.001665963,0.1610044,0.002421669,0.18537076,0.0047591487,0.086537324],"study_design_scores_gemma":[0.00019986682,0.0006246979,0.8404038,0.000088233865,0.00033972785,0.00024792025,0.0037847245,0.06947403,0.0021597478,0.069916256,0.012628111,0.00013295119],"about_ca_topic_score_codex":0.08220719,"about_ca_topic_score_gemma":0.06562831,"teacher_disagreement_score":0.08220719,"about_ca_system_score_codex":0.011642285,"about_ca_system_score_gemma":0.002616954,"threshold_uncertainty_score":0.1634574},"labels":[],"label_agreement":null},{"id":"W2032214672","doi":"10.1109/mper.2001.4311234","title":"Combined Pool/Bilateral Dispatch-Part 1: Performance of Mixed Trading Strategies","year":2001,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Profitability index; Revenue; Microeconomics; Economic dispatch; Business; Economics; Industrial organization; Power (physics); Electric power system; Finance","score_opus":0.007873853520635382,"score_gpt":0.19969068446738905,"score_spread":0.19181683094675367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2032214672","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.74170554,0.0006049312,0.2347509,0.00031974135,0.000048082864,0.0002760391,0.00014210686,0.00015123822,0.022001427],"genre_scores_gemma":[0.97998226,0.00012179651,0.01819573,0.00002497097,0.000010677034,0.00008708115,0.000038329683,0.000021456717,0.0015177615],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980889,0.0009972614,0.000107684915,0.00018801891,0.0004313127,0.0001868383],"domain_scores_gemma":[0.9961079,0.0026460763,0.000417591,0.00035033392,0.0003073452,0.0001707879],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036930162,0.0008554127,0.0014756317,0.0005214921,0.00038507007,0.002267608,0.0011456001,0.00078753947,0.0033505126],"category_scores_gemma":[0.008577749,0.00035208833,0.00058000354,0.00070200313,0.0007483834,0.0030766039,0.0013017178,0.00082984223,0.00029358632],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012016182,0.00024325054,0.0038457047,0.00017480542,0.00024664166,0.00018794365,0.00012369663,0.90487015,0.005554354,0.012772492,0.00046139964,0.070317835],"study_design_scores_gemma":[0.00009901597,0.00070144533,0.0012591361,0.000012061831,0.000051192357,0.00006327558,0.00008030289,0.9856705,0.0030149692,0.008513325,0.0005135233,0.000021326274],"about_ca_topic_score_codex":0.0013491311,"about_ca_topic_score_gemma":0.0019250986,"teacher_disagreement_score":0.0036930162,"about_ca_system_score_codex":0.00077016035,"about_ca_system_score_gemma":0.0008811795,"threshold_uncertainty_score":0.019530773},"labels":[],"label_agreement":null},{"id":"W2035748496","doi":"10.5539/mas.v3n6p38","title":"Study on Economic, Rapid and Environmental Power Dispatch Based on Fuzzy Multi-objective Optimization","year":2009,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Economic dispatch; Computer science; Mathematical optimization; Fuzzy logic; MATLAB; Process (computing); Power system simulation; Dynamic programming; Linear programming; Unit (ring theory); Electric power system; Operations research; Power (physics); Engineering; Mathematics; Artificial intelligence; Algorithm","score_opus":0.006996673967471825,"score_gpt":0.20249065856349543,"score_spread":0.1954939845960236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2035748496","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0598393,0.0007229402,0.9297325,0.00045350552,0.0000714867,0.0000720904,0.0000505185,0.0000560807,0.0090015605],"genre_scores_gemma":[0.9051091,0.0006138111,0.08992346,0.00006732783,0.00007382086,0.0001256974,0.000056099034,0.00003090764,0.0039998437],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996195,0.00017883301,0.000012729717,0.000046272977,0.00010429646,0.000038410482],"domain_scores_gemma":[0.9995571,0.00030566318,0.0000433425,0.0000119226215,0.000058523234,0.000023461647],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012018346,0.00081995124,0.0010381636,0.0005052781,0.0003639792,0.00099272,0.0006783547,0.0006801018,0.0015934849],"category_scores_gemma":[0.0013767476,0.00036725434,0.0006848965,0.00066540233,0.0005078253,0.0010070197,0.0003828242,0.0008402906,0.00010809873],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012967128,0.000013775031,0.00009749584,0.00002366807,0.0000163304,0.00002465264,0.000011816662,0.98752695,0.00023309854,0.006840946,0.00015639246,0.0050419034],"study_design_scores_gemma":[0.0000028943962,0.000010491174,0.000041669748,0.0000016341693,0.0000021936114,0.0000030721374,0.0000032188877,0.9984308,0.000054885226,0.0013430528,0.00010431549,0.0000018545169],"about_ca_topic_score_codex":0.006007057,"about_ca_topic_score_gemma":0.0032074037,"teacher_disagreement_score":0.006007057,"about_ca_system_score_codex":0.0010081178,"about_ca_system_score_gemma":0.0009475703,"threshold_uncertainty_score":0.011944175},"labels":[],"label_agreement":null},{"id":"W2036213815","doi":"10.1109/irep.2013.6629402","title":"Chance-constrained generation expansion planning based on iterative risk allocation","year":2013,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis; University of Calgary","funders":"","keywords":"Reliability (semiconductor); Mathematical optimization; Iterative method; Computer science; Reliability engineering; Mathematics; Engineering","score_opus":0.010367084757955707,"score_gpt":0.20453421009788372,"score_spread":0.19416712533992803,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2036213815","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0074896496,0.00010090749,0.990146,0.00005306119,0.000010217006,0.000029822368,0.00001348295,0.00008056633,0.002076284],"genre_scores_gemma":[0.60085815,0.0003299407,0.39559108,0.00006192158,0.00003860667,0.0003408195,0.000097964396,0.000080564416,0.0026009786],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993931,0.0002800737,0.000019972002,0.000058395006,0.00018202684,0.0000664143],"domain_scores_gemma":[0.99916553,0.00061591674,0.00006429329,0.00002920557,0.000090563,0.000034527926],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010053775,0.00066723593,0.0008194221,0.00052256417,0.00033696968,0.0005476993,0.0008819376,0.00055611803,0.0018514091],"category_scores_gemma":[0.0022349153,0.0004901182,0.0007555795,0.0006663431,0.00071124424,0.00082832226,0.0009015704,0.0007715807,0.00024238393],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018137494,0.000007830698,0.00012987929,0.000018434226,0.000014475347,0.00003134625,0.00002249743,0.9781616,0.00042123673,0.0094221495,0.00021295661,0.011539525],"study_design_scores_gemma":[0.0000037272155,0.0000098665305,0.000024333347,0.0000028350346,0.0000022610066,0.000008756321,0.0000020954412,0.99713,0.00015146322,0.0025163733,0.00014518769,0.0000031803067],"about_ca_topic_score_codex":0.003987391,"about_ca_topic_score_gemma":0.0041055363,"teacher_disagreement_score":0.003987391,"about_ca_system_score_codex":0.0006486643,"about_ca_system_score_gemma":0.0013100441,"threshold_uncertainty_score":0.007928371},"labels":[],"label_agreement":null},{"id":"W2036531676","doi":"10.1007/s10614-010-9200-8","title":"A Benders Decomposition Method for Solving Stochastic Complementarity Problems with an Application in Energy","year":2010,"lang":"en","type":"article","venue":"Computational Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Complementarity (molecular biology); Variational inequality; Mixed complementarity problem; Mathematical optimization; Mathematics; Benders' decomposition; Linear complementarity problem; Convergence (economics); Applied mathematics; Complementarity theory; Mathematical economics; Economics","score_opus":0.00907199003721107,"score_gpt":0.24683673896268393,"score_spread":0.23776474892547286,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2036531676","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010884758,0.00011888013,0.99712855,0.00008955359,0.00006445845,0.00002436243,0.00003679554,0.00007987836,0.0013690112],"genre_scores_gemma":[0.040939767,0.0005234066,0.94866014,0.00019705585,0.00015372477,0.0003333492,0.0001911188,0.00031596917,0.008685545],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993467,0.00031464055,0.00002903334,0.00008632669,0.00017853068,0.0000446753],"domain_scores_gemma":[0.99885225,0.0007553405,0.00006737759,0.00008053036,0.0001730978,0.00007132676],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018578449,0.0018097362,0.0015919949,0.00095306756,0.0007414822,0.0009597351,0.0012649797,0.002028912,0.007191878],"category_scores_gemma":[0.0034106667,0.001129648,0.0021491905,0.0013398138,0.0010871715,0.0013984118,0.0015720498,0.0037632217,0.0015365522],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011017416,0.00015948802,0.00028220698,0.00024039259,0.00013683885,0.00012005425,0.000114490584,0.7096623,0.0047592334,0.17013119,0.0065568895,0.10772669],"study_design_scores_gemma":[0.00001504548,0.00003422016,0.000052282023,0.000015983589,0.000015032801,0.000019097459,0.000009036363,0.9635599,0.00052821456,0.032667644,0.0030693614,0.000014081101],"about_ca_topic_score_codex":0.0032009084,"about_ca_topic_score_gemma":0.0036014256,"teacher_disagreement_score":0.007191878,"about_ca_system_score_codex":0.0005447213,"about_ca_system_score_gemma":0.0014609756,"threshold_uncertainty_score":0.024059176},"labels":[],"label_agreement":null},{"id":"W203682728","doi":"10.1007/978-1-4614-8987-0_1","title":"Recent Progress in Modeling Unit Commitment Problems","year":2013,"lang":"en","type":"book-chapter","venue":"Springer proceedings in mathematics & statistics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Power system simulation; Computer science; Mathematical optimization; Schedule; Optimization problem; Electric power system; Operations research; Unit (ring theory); Point (geometry); Power (physics); Engineering; Mathematics","score_opus":0.025238016162458153,"score_gpt":0.23243803322077308,"score_spread":0.20720001705831492,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W203682728","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0055621006,0.049080733,0.91609585,0.0019402505,0.0008258231,0.000037214722,0.00039258986,0.0008430568,0.025222387],"genre_scores_gemma":[0.2615538,0.1613989,0.51572204,0.0013997942,0.0042165946,0.00042235528,0.0032106808,0.001503488,0.0505724],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99925846,0.00030645204,0.00004609188,0.00010670984,0.00024527294,0.00003698578],"domain_scores_gemma":[0.9984322,0.0010381927,0.00007625559,0.0001760717,0.00022679899,0.00005032804],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001473129,0.0016361387,0.002066359,0.00080546783,0.0003365536,0.0028627708,0.0027464437,0.001343305,0.0058211074],"category_scores_gemma":[0.0040651597,0.0008247913,0.0011432372,0.0027947968,0.00073577825,0.0031687745,0.0011289604,0.0029677886,0.0025327106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040429506,0.00009793299,0.00059646094,0.00091324735,0.00009513034,0.00006855576,0.000083744395,0.6367811,0.0008918767,0.117806755,0.016008679,0.22661607],"study_design_scores_gemma":[0.000006065977,0.000015376521,0.00015756057,0.00009083709,0.000019950952,0.000038483213,0.000016601394,0.8954591,0.00031565892,0.08044764,0.023418326,0.00001445258],"about_ca_topic_score_codex":0.004652451,"about_ca_topic_score_gemma":0.003930875,"teacher_disagreement_score":0.0058211074,"about_ca_system_score_codex":0.0010170131,"about_ca_system_score_gemma":0.0013550686,"threshold_uncertainty_score":0.019473553},"labels":[],"label_agreement":null},{"id":"W2037962945","doi":"10.1109/pesgm.2012.6345612","title":"Optimal incentive design to facilitate solar PV investments in Ontario","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Photovoltaic system; Tariff; Internal rate of return; Incentive; Grid; Environmental economics; Context (archaeology); Investment (military); Return on investment; Business; Feed-in tariff; Solar energy; Solar power; Rate of return; Renewable energy; Computer science; Finance; Economics; Engineering; Power (physics); Electrical engineering; Microeconomics; Energy policy; Production (economics); Geography","score_opus":0.04282282999054314,"score_gpt":0.2056936412309724,"score_spread":0.16287081124042924,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2037962945","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7601166,0.00061121327,0.14108022,0.0025206767,0.00005817897,0.00071088644,0.0012896206,0.00024821758,0.09336446],"genre_scores_gemma":[0.9857303,0.00014471218,0.0077541997,0.000035061552,0.000004347959,0.00005161466,0.00008447928,0.00001066503,0.006184584],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995678,0.0001188094,0.0000101331725,0.000048641596,0.00006704676,0.00018752835],"domain_scores_gemma":[0.9994448,0.00022571275,0.000085849686,0.000016618758,0.00012195686,0.000104993116],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00089910073,0.00044690113,0.0005083043,0.00039026944,0.0006458865,0.0013063723,0.000983986,0.00080912997,0.003858566],"category_scores_gemma":[0.0022057593,0.0004897929,0.0002796121,0.00048269352,0.00062471133,0.00076773454,0.0006948363,0.0005142581,0.00015942869],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022073906,0.000072815,0.0025145672,0.00006996322,0.000015072998,0.00014042889,0.0000942049,0.9604884,0.0014110004,0.02162401,0.0018850963,0.0114636095],"study_design_scores_gemma":[0.00013849311,0.00010610071,0.0029067134,0.000019871708,0.000022576793,0.00002432992,0.00016962059,0.9845241,0.0008183618,0.006756378,0.004492986,0.000020496327],"about_ca_topic_score_codex":0.39712155,"about_ca_topic_score_gemma":0.52629244,"teacher_disagreement_score":0.60287845,"about_ca_system_score_codex":0.011753022,"about_ca_system_score_gemma":0.011444528,"threshold_uncertainty_score":0.7896201},"labels":[],"label_agreement":null},{"id":"W2041190124","doi":"10.1016/j.enconman.2009.12.001","title":"Strategic simulation of the energy management in a Kraft mill","year":2010,"lang":"en","type":"article","venue":"Energy Conversion and Management","topic":"Electric Power System Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Polytechnique Montréal","keywords":"Cogeneration; Steam turbine; Mill; Engineering; Payback period; Steam-electric power station; Process engineering; Waste management; Turbine; Electricity generation; Environmental science; Power (physics); Production (economics); Mechanical engineering; Combined cycle; Economics","score_opus":0.00486151011384164,"score_gpt":0.18031202018336237,"score_spread":0.17545051006952073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2041190124","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9361718,0.00008843603,0.01587848,0.00067336636,0.00004782874,0.000058853024,0.00029205316,0.00009112449,0.046697963],"genre_scores_gemma":[0.9964085,0.000027165728,0.001116091,0.000021623444,0.0000023100977,0.000015489906,0.000045215093,0.000007570634,0.0023560356],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998037,0.00006649789,0.000006113842,0.000021305223,0.00002761519,0.00007471832],"domain_scores_gemma":[0.9994721,0.00030134874,0.000038257058,0.00002383452,0.00006212713,0.000102426515],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003130008,0.00042094765,0.0006938239,0.00037977484,0.0008665348,0.0013885173,0.00081752765,0.00177981,0.0076574343],"category_scores_gemma":[0.0009646377,0.00041712346,0.00041881364,0.0005666329,0.00078050356,0.00076961884,0.0008188484,0.0010738382,0.00029448394],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007091496,0.00005624577,0.0006152256,0.0000070309525,0.000005650995,0.000056985136,0.000021168054,0.99557555,0.00023202013,0.0026547397,0.00013391822,0.0005705207],"study_design_scores_gemma":[0.00002258938,0.00005217879,0.0002487695,0.0000019982213,0.0000035645594,0.000005576252,0.00008169328,0.99835134,0.00020932814,0.00079581677,0.00022207151,0.0000051718775],"about_ca_topic_score_codex":0.03638417,"about_ca_topic_score_gemma":0.027631821,"teacher_disagreement_score":0.03638417,"about_ca_system_score_codex":0.001684415,"about_ca_system_score_gemma":0.0023150325,"threshold_uncertainty_score":0.07234478},"labels":[],"label_agreement":null},{"id":"W2041771057","doi":"10.1109/pesgm.2014.6939525","title":"Operational experience with Static var Compensators in Ontario, Canada","year":2014,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University; Hydro One (Canada)","funders":"","keywords":"Plan (archaeology); Renewable energy; Development plan; Computer science; Engineering; Environmental economics; Civil engineering; Economics; Electrical engineering; Geography","score_opus":0.00341986999060798,"score_gpt":0.15404291090203223,"score_spread":0.15062304091142426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2041771057","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89168626,0.0010469911,0.0042252936,0.0019206987,0.00005238389,0.00013246799,0.0007292619,0.00012847237,0.100078195],"genre_scores_gemma":[0.96952003,0.0008728125,0.001703071,0.00014238643,0.0000108218155,0.000012222712,0.0004397374,0.00004391178,0.027254913],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9986852,0.00012575103,0.000038859675,0.000086971384,0.0007053257,0.00035800727],"domain_scores_gemma":[0.99867463,0.00009043221,0.000036101253,0.000027765636,0.0009847059,0.0001864055],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00074517,0.0003930793,0.000247868,0.00032552832,0.0040713013,0.0012067282,0.0007597687,0.00045203525,0.0030692765],"category_scores_gemma":[0.001216395,0.00017865299,0.00020982826,0.0013322878,0.0011037355,0.0005066212,0.00060142507,0.00046364407,0.00045023873],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018981223,0.0010343026,0.18528183,0.0010322529,0.00023722216,0.0062776953,0.07333715,0.09285322,0.07328275,0.013698693,0.07039525,0.4806715],"study_design_scores_gemma":[0.00028448817,0.0017940296,0.29030892,0.00026070423,0.00022654698,0.001248788,0.11435327,0.03529454,0.0215453,0.0013446832,0.5330119,0.00032681835],"about_ca_topic_score_codex":0.98250926,"about_ca_topic_score_gemma":0.9938035,"teacher_disagreement_score":0.022385433,"about_ca_system_score_codex":0.022385433,"about_ca_system_score_gemma":0.02799014,"threshold_uncertainty_score":0.16241843},"labels":[],"label_agreement":null},{"id":"W2042743259","doi":"10.1109/pes.2010.5589322","title":"Oligopolistic competition of gencos in reactive power ancillary service provisions","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"AC power; Oligopoly; Procurement; Market power; Electric power system; Operator (biology); Competition (biology); Electricity market; Incentive; Business; Industrial organization; Computer science; Power (physics); Risk analysis (engineering); Microeconomics; Economics; Cournot competition; Engineering; Electricity; Electrical engineering; Monopoly; Voltage; Marketing","score_opus":0.003489291715305957,"score_gpt":0.19221003147504487,"score_spread":0.1887207397597389,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2042743259","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7529681,0.00036842478,0.18637355,0.0011225906,0.00009064035,0.0001690569,0.00029491386,0.00011450292,0.058498245],"genre_scores_gemma":[0.9914205,0.00011074669,0.0046362206,0.000053154326,0.0000054667503,0.000048112935,0.0000139003205,0.000009675682,0.0037022335],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99919504,0.0004856379,0.000017558981,0.00008484408,0.00008710388,0.00012989237],"domain_scores_gemma":[0.9983516,0.0010282758,0.00029649964,0.000071211296,0.00013014946,0.00012226528],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018994524,0.00054695876,0.0009879007,0.0004856324,0.00090814044,0.0020348772,0.0011665957,0.0016433249,0.00474198],"category_scores_gemma":[0.0032802348,0.0006846625,0.00080694014,0.00077755045,0.0018775951,0.0017319402,0.0008850726,0.0010270419,0.0003154886],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009786789,0.00003352506,0.0005487892,0.00003300178,0.000014904106,0.0002221043,0.00004337307,0.95477986,0.0008595345,0.04219054,0.0002404536,0.0009360358],"study_design_scores_gemma":[0.0000408969,0.00006339952,0.0002315911,0.000007337194,0.000010985395,0.000025894795,0.00005632034,0.98965466,0.00019905447,0.009249295,0.00044679537,0.000013618142],"about_ca_topic_score_codex":0.012408513,"about_ca_topic_score_gemma":0.018664641,"teacher_disagreement_score":0.012408513,"about_ca_system_score_codex":0.002465886,"about_ca_system_score_gemma":0.0021524134,"threshold_uncertainty_score":0.024672627},"labels":[],"label_agreement":null},{"id":"W2042804291","doi":"10.1109/eem.2012.6254727","title":"On the significance of hydro storage in leveraging wind integration in thermal systems","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Renewable energy; Environmental science; Diversification (marketing strategy); Hydroelectricity; Electric power system; Pumped-storage hydroelectricity; Environmental economics; Wind speed; Energy storage; Computer science; Reliability engineering; Marine engineering; Distributed generation; Engineering; Meteorology; Business; Electrical engineering; Power (physics); Economics","score_opus":0.012005068557882763,"score_gpt":0.19776253499842242,"score_spread":0.18575746644053964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2042804291","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96139336,0.0019876296,0.01797069,0.0006346363,0.000035875644,0.00006429471,0.00009409477,0.000036758753,0.017782647],"genre_scores_gemma":[0.9980944,0.00034237222,0.0011634524,0.000012801521,0.000014791382,0.000005318467,0.000008322422,0.00000327387,0.0003554046],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99964,0.00020100937,0.000014944509,0.000020258096,0.00007579127,0.000048032085],"domain_scores_gemma":[0.9976284,0.0017291325,0.0002398395,0.0001043545,0.0002101427,0.00008809194],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018741096,0.000549972,0.00043808715,0.00032232003,0.00034203412,0.0010415537,0.00033967674,0.0005677533,0.0016321673],"category_scores_gemma":[0.004205432,0.00018387852,0.00025153716,0.00043572066,0.00074674847,0.0015426714,0.00055785006,0.00039561966,0.00011157985],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000693885,0.00012549845,0.008774048,0.00017960218,0.00006329239,0.00033409457,0.00003649793,0.9429317,0.008211746,0.004047894,0.00018489682,0.03441682],"study_design_scores_gemma":[0.00006858792,0.0032052503,0.023742424,0.00011070283,0.0002407682,0.00037630007,0.00037082966,0.94552916,0.015305107,0.009340486,0.0016543046,0.000056042216],"about_ca_topic_score_codex":0.0017570725,"about_ca_topic_score_gemma":0.0048939134,"teacher_disagreement_score":0.0018741096,"about_ca_system_score_codex":0.00042484954,"about_ca_system_score_gemma":0.00051916606,"threshold_uncertainty_score":0.009911299},"labels":[],"label_agreement":null},{"id":"W2043006350","doi":"10.1109/tpwrs.2004.826706","title":"Discussion of “New Models for Integrated Short-Term Forward Electricity Markets”","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Term (time); Electricity; Electricity market; Electric power system; Computer science; Mathematical economics; Electricity system; Economics; Electricity generation; Operations research; Engineering; Electrical engineering; Power (physics); Physics","score_opus":0.01252078679795736,"score_gpt":0.2236188163585204,"score_spread":0.21109802956056303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2043006350","genre_codex":"methods","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007194312,0.0064166645,0.75154334,0.05981061,0.0062126704,0.000107763495,0.00062464655,0.00032327016,0.16776666],"genre_scores_gemma":[0.544724,0.013846931,0.23839875,0.03483672,0.010752982,0.0007501631,0.000949523,0.0004592802,0.15528166],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99891233,0.00050112314,0.000041214087,0.00013019625,0.00030797723,0.00010724788],"domain_scores_gemma":[0.9991099,0.0004114071,0.00012852873,0.00012125854,0.00016694737,0.0000618995],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031793476,0.0012697829,0.00066414056,0.0006450127,0.0013506203,0.0022943146,0.0036109863,0.004881316,0.014939673],"category_scores_gemma":[0.004758988,0.0005991074,0.0026192712,0.00083665136,0.0024324767,0.0075094863,0.0019386645,0.006039135,0.0021480375],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000069499333,0.000006690381,0.000020549087,0.000022067661,0.000009812105,0.00004388624,0.000022368109,0.005930643,0.000084411295,0.9855327,0.0065877214,0.001732123],"study_design_scores_gemma":[0.00001100308,0.000017141052,0.000037700484,0.000028103377,0.000009137092,0.00006911436,0.000011023466,0.042020716,0.00019222598,0.9200063,0.03758458,0.000013043633],"about_ca_topic_score_codex":0.0025927988,"about_ca_topic_score_gemma":0.0031830599,"teacher_disagreement_score":0.014939673,"about_ca_system_score_codex":0.002535602,"about_ca_system_score_gemma":0.001299305,"threshold_uncertainty_score":0.049978137},"labels":[],"label_agreement":null},{"id":"W2044586014","doi":"10.1109/pes.2008.4596106","title":"Pricing energy and reserves using stochastic optimization in an alternative electricity market","year":2008,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Activity-based costing; Electricity market; Computer science; Energy market; Linear programming; Electricity; Electric power system; Mathematical optimization; Stochastic programming; Profit (economics); Generator (circuit theory); Contingency; Operations research; Economics; Microeconomics; Electrical engineering; Engineering; Mathematics; Power (physics)","score_opus":0.01570539802198557,"score_gpt":0.21969067733932018,"score_spread":0.20398527931733462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2044586014","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21022378,0.0004477423,0.7570818,0.0016982134,0.00008188206,0.00013973338,0.0006256034,0.0002995827,0.029401746],"genre_scores_gemma":[0.97472745,0.00023480791,0.017379742,0.0000709042,0.000051981384,0.00009621061,0.00012841784,0.000032688902,0.0072778477],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99912316,0.00041411116,0.000025596444,0.00007497715,0.00026022983,0.00010192021],"domain_scores_gemma":[0.999215,0.0005004472,0.000117190175,0.000028232085,0.00008385033,0.00005524749],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013206035,0.0007530865,0.001112069,0.00045563764,0.00045117794,0.0016409827,0.0010951228,0.0012123337,0.003922514],"category_scores_gemma":[0.0021943997,0.0005221626,0.0007632799,0.00096970855,0.0012076763,0.0013050224,0.0007636692,0.00090816774,0.00026975677],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019374296,0.00001212549,0.000092845716,0.000008706694,0.000006691729,0.000031227424,0.000005342576,0.98587036,0.00009722476,0.012278085,0.00022557713,0.0013525093],"study_design_scores_gemma":[0.000006275503,0.000008761417,0.00004335353,9.212896e-7,0.0000020648813,0.000004463876,0.0000021221078,0.9968219,0.000023384551,0.002970316,0.00011368275,0.0000027097842],"about_ca_topic_score_codex":0.019573003,"about_ca_topic_score_gemma":0.022436807,"teacher_disagreement_score":0.019573003,"about_ca_system_score_codex":0.0028837288,"about_ca_system_score_gemma":0.002087393,"threshold_uncertainty_score":0.038918138},"labels":[],"label_agreement":null},{"id":"W2044702745","doi":"10.1109/tpwrs.2012.2193490","title":"Long-Term Market Equilibrium Model With Strategic, Competitive, and Inflexible Generation","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Term (time); Generator (circuit theory); Electricity; Electricity market; Reliability (semiconductor); Economics; Electricity generation; Computer science; Microeconomics; Industrial organization; Mathematical optimization; Engineering; Mathematics; Power (physics); Thermodynamics; Physics","score_opus":0.02015164106900449,"score_gpt":0.21786168911202652,"score_spread":0.19771004804302203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2044702745","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12035683,0.0008504352,0.80871975,0.0022673868,0.00016746642,0.0001423062,0.0017636128,0.00044342098,0.065288894],"genre_scores_gemma":[0.8964531,0.0006597238,0.033770487,0.00029349522,0.000071827315,0.0003579262,0.00064383727,0.00011250131,0.06763707],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995228,0.00015161962,0.000020572095,0.0000962894,0.00008892566,0.00011979661],"domain_scores_gemma":[0.9992347,0.00030255932,0.00013774465,0.00003942072,0.000190177,0.000095452786],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013384771,0.0008665366,0.0012741855,0.00076256704,0.0007893979,0.002022781,0.003555194,0.0029144487,0.009585207],"category_scores_gemma":[0.0020890536,0.000656989,0.0013177564,0.0011223,0.0011810214,0.0022862626,0.0011924754,0.0017584689,0.0013195104],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005875774,0.000043731936,0.0003174642,0.000043937234,0.000044462486,0.0003344558,0.000081502476,0.874475,0.00088939775,0.119841054,0.0014176589,0.0024526224],"study_design_scores_gemma":[0.000032314754,0.000029498833,0.00016698781,0.000006289139,0.000014662765,0.00005853511,0.000031532367,0.9761331,0.000079452184,0.022332015,0.0010982198,0.000017465301],"about_ca_topic_score_codex":0.01629245,"about_ca_topic_score_gemma":0.012531583,"teacher_disagreement_score":0.01629245,"about_ca_system_score_codex":0.0018663298,"about_ca_system_score_gemma":0.0018635587,"threshold_uncertainty_score":0.032395244},"labels":[],"label_agreement":null},{"id":"W2045533333","doi":"10.1061/(asce)ey.1943-7897.0000177","title":"Optimal Management of Wind Energy with Storage: Structural Implications for Policy and Market Design","year":2014,"lang":"en","type":"article","venue":"Journal of Energy Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Energy storage; Computer science; Electricity market; Wind power; Heuristics; Revenue; Electricity; Environmental economics; Operations research; Risk analysis (engineering); Economics; Business; Engineering; Finance","score_opus":0.004505203431815673,"score_gpt":0.1912719324296611,"score_spread":0.1867667289978454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045533333","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27497402,0.0015478787,0.63439375,0.012472329,0.00016271915,0.00064948155,0.00057452754,0.00017678046,0.07504847],"genre_scores_gemma":[0.9788576,0.0007340401,0.016752627,0.000128513,0.000040841285,0.00013997569,0.0000575468,0.000018680217,0.003270082],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993187,0.00035128475,0.000023495366,0.00008225157,0.00009403292,0.00013032948],"domain_scores_gemma":[0.99860054,0.0008219051,0.00027066446,0.00007273173,0.00012540098,0.00010880614],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014507414,0.00046546786,0.0009995193,0.00042683788,0.00051463593,0.0022781976,0.0010083388,0.0017022152,0.004855394],"category_scores_gemma":[0.004628791,0.00064756244,0.00051583943,0.000512391,0.001484738,0.0035899435,0.00069462974,0.0011820451,0.00016876504],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032002423,0.000049821956,0.0002476587,0.00004424677,0.000014495876,0.00005765118,0.000020474265,0.8584238,0.00043572113,0.13585702,0.00058468076,0.0042324197],"study_design_scores_gemma":[0.00003488479,0.00004250776,0.0002699,0.000016046291,0.000008843849,0.000015113666,0.000088097615,0.8468712,0.00018271718,0.15138502,0.001073631,0.000012004933],"about_ca_topic_score_codex":0.005041569,"about_ca_topic_score_gemma":0.0065781763,"teacher_disagreement_score":0.005041569,"about_ca_system_score_codex":0.0024156028,"about_ca_system_score_gemma":0.003496467,"threshold_uncertainty_score":0.017526448},"labels":[],"label_agreement":null},{"id":"W2045605828","doi":"10.1145/2591971.2591999","title":"Randomized auction design for electricity markets between grids and microgrids","year":2014,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Microgrid; Computer science; Double auction; Common value auction; Grid; Mathematical optimization; Electricity; Auction theory; Combinatorial auction; Reverse auction; Auction algorithm; Distributed computing; Microeconomics; Revenue equivalence; Economics; Electrical engineering; Engineering; Mathematics","score_opus":0.009333468830472879,"score_gpt":0.20352096680392912,"score_spread":0.19418749797345625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045605828","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0256098,0.00026234338,0.9672019,0.0003789844,0.000093879135,0.000245729,0.0001275414,0.000250022,0.0058298],"genre_scores_gemma":[0.76941127,0.0003327743,0.22302264,0.000253969,0.00008653156,0.0005138139,0.00017672869,0.000108880005,0.006093373],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9961087,0.0023545856,0.00015184119,0.00046742245,0.00055666006,0.00036066616],"domain_scores_gemma":[0.9918066,0.005424362,0.0009845796,0.00069071964,0.0007412269,0.0003526421],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005887531,0.0009873653,0.0016898031,0.00051420566,0.0006130645,0.0026765664,0.0026428995,0.0016303415,0.006384012],"category_scores_gemma":[0.016472122,0.00080446183,0.00095830497,0.0007791192,0.0013947961,0.00339266,0.001427697,0.0019617688,0.00076424977],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031182924,0.00019087242,0.00038541443,0.00016271997,0.000064782595,0.000148113,0.00006344397,0.8576099,0.0014051505,0.1208096,0.0017581099,0.01709002],"study_design_scores_gemma":[0.000107972955,0.00007916688,0.000051161525,0.000006772138,0.0000119854785,0.00003639192,0.000017287059,0.965045,0.0002808616,0.033595007,0.000757718,0.000010556237],"about_ca_topic_score_codex":0.0013832717,"about_ca_topic_score_gemma":0.0013935141,"teacher_disagreement_score":0.006384012,"about_ca_system_score_codex":0.0015668977,"about_ca_system_score_gemma":0.002699408,"threshold_uncertainty_score":0.031136632},"labels":[],"label_agreement":null},{"id":"W2045715296","doi":"10.5539/mas.v4n8p33","title":"Application of Differential Evolution for Congestion Management in Power System","year":2010,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Congestion management; Particle swarm optimization; Differential evolution; Computer science; Reliability (semiconductor); Electric power system; Mathematical optimization; Electricity market; Database transaction; Electricity; Differential (mechanical device); Work (physics); Order (exchange); Management system; Operations research; Reliability engineering; Power (physics); Algorithm; Operations management; Mathematics; Business; Economics; Engineering; Electrical engineering","score_opus":0.0030846686611372977,"score_gpt":0.1921479679280912,"score_spread":0.1890632992669539,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045715296","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.111972146,0.00049622805,0.8811823,0.00031516104,0.000051292052,0.000048115133,0.000016573604,0.00011870251,0.0057994993],"genre_scores_gemma":[0.9621017,0.00018195112,0.036558133,0.000033412656,0.0000126028735,0.000035317906,0.000013265994,0.00001180994,0.0010517605],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998591,0.00006850938,0.0000052996143,0.000015331723,0.000037661423,0.000014191053],"domain_scores_gemma":[0.99983084,0.000104283106,0.000018360215,0.000009281904,0.000027607142,0.000009581495],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005121332,0.0002572663,0.00029471875,0.00027652254,0.0002032703,0.000352465,0.0003664814,0.00035574846,0.00047159448],"category_scores_gemma":[0.0010821924,0.00015463622,0.0002237374,0.00029875492,0.00033289392,0.00030389047,0.00045934928,0.00030245536,0.0000457212],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003255351,0.000021623442,0.0007798349,0.000029558618,0.000024645668,0.00007887945,0.000049991722,0.95185006,0.0028891095,0.007852231,0.0002274209,0.036164146],"study_design_scores_gemma":[0.000003031361,0.00001596872,0.000086897926,0.0000010929136,0.0000019258785,0.000008700809,0.0000024563697,0.9985537,0.0002677952,0.0008552851,0.00020176779,0.0000013881494],"about_ca_topic_score_codex":0.0020430624,"about_ca_topic_score_gemma":0.0013585925,"teacher_disagreement_score":0.0020430624,"about_ca_system_score_codex":0.00041754116,"about_ca_system_score_gemma":0.00023907018,"threshold_uncertainty_score":0.0040623546},"labels":[],"label_agreement":null},{"id":"W2048939653","doi":"10.1109/pesgm.2014.6939482","title":"Multi-scene security constrained economic dispatch with rational wind power curtailment in micro-grid","year":2014,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Wind power; Economic dispatch; Grid; Computer science; Spinning; Reliability (semiconductor); Power (physics); Power grid; Reliability engineering; Electric power system; Range (aeronautics); Wind speed; Mathematical optimization; Engineering; Electrical engineering; Meteorology; Mathematics; Geography","score_opus":0.0032755357306799597,"score_gpt":0.18183909598541453,"score_spread":0.17856356025473458,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2048939653","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.068600245,0.00033212872,0.9268624,0.00032151426,0.000084003455,0.000055304423,0.00007772977,0.00013442352,0.0035322686],"genre_scores_gemma":[0.9513415,0.00014199922,0.046815835,0.000042072636,0.000032433636,0.000059934577,0.00005399261,0.00003772147,0.001474484],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999762,0.00008903317,0.00001011168,0.000038678725,0.000058595775,0.00004155031],"domain_scores_gemma":[0.9997483,0.000117095486,0.00004754787,0.000013202409,0.00004254407,0.000031301654],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005197874,0.00073676056,0.0010758343,0.0002970936,0.0003566839,0.0006803909,0.0006912766,0.00048957375,0.0012604863],"category_scores_gemma":[0.0007887426,0.00044078042,0.00046000103,0.00043539557,0.0004011677,0.0009226574,0.0006411899,0.0006704246,0.000096724274],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004535828,0.000012302473,0.00022868396,0.000019006511,0.000014825003,0.00005266803,0.000012070782,0.98889613,0.00038142648,0.0043009194,0.00034306175,0.0056935586],"study_design_scores_gemma":[0.0000035291887,0.000005908932,0.00003764267,5.538488e-7,0.0000011192824,0.000002527753,0.0000031969212,0.99914205,0.00004185869,0.0006883206,0.00007188098,0.0000013076256],"about_ca_topic_score_codex":0.004572104,"about_ca_topic_score_gemma":0.003723677,"teacher_disagreement_score":0.004572104,"about_ca_system_score_codex":0.00054568116,"about_ca_system_score_gemma":0.00061658915,"threshold_uncertainty_score":0.00909096},"labels":[],"label_agreement":null},{"id":"W2049816691","doi":"10.1016/s0301-4215(02)00331-2","title":"Deregulated power prices: comparison of diurnal patterns","year":2003,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"University of Alberta","keywords":"Incentive; Economics; Consumption (sociology); Market power; Market price; Econometrics; Microeconomics; Business; Monetary economics","score_opus":0.0066437289222762725,"score_gpt":0.2296884580782942,"score_spread":0.22304472915601792,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2049816691","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9907686,0.00023777976,0.0027703373,0.00020942667,0.00003492169,0.000010400641,0.0012733121,0.00009554842,0.0045996294],"genre_scores_gemma":[0.9982311,0.00008707929,0.0004760041,0.000016069138,0.000011461676,0.0000042304996,0.00080760336,0.00002237787,0.00034410207],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9997104,0.000077406556,0.000025047706,0.000050134917,0.00008267072,0.00005426918],"domain_scores_gemma":[0.9982303,0.0007736861,0.00022358791,0.00018900851,0.00051469455,0.00006874331],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065326807,0.00017245708,0.0004676415,0.00075628795,0.00019974876,0.00084479735,0.00036703158,0.00047135472,0.0013988108],"category_scores_gemma":[0.0032635601,0.00021629396,0.00036551786,0.0015626358,0.00018047125,0.00086245826,0.00023271878,0.00030787013,0.00026310835],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.008470404,0.0006540446,0.38246864,0.00080801174,0.0011871657,0.0018243936,0.0015005127,0.3362554,0.042181958,0.020638114,0.020735098,0.1832762],"study_design_scores_gemma":[0.00011114623,0.00051012833,0.6809258,0.000047767448,0.00017927928,0.00090940954,0.0010578395,0.2918655,0.01137007,0.0052846596,0.007615664,0.00012269584],"about_ca_topic_score_codex":0.0027070157,"about_ca_topic_score_gemma":0.005935158,"teacher_disagreement_score":0.0027070157,"about_ca_system_score_codex":0.00042839462,"about_ca_system_score_gemma":0.00017734071,"threshold_uncertainty_score":0.0053824782},"labels":[],"label_agreement":null},{"id":"W2050002896","doi":"10.1016/j.enpol.2003.09.001","title":"Corrigendum to “Deregulated power prices: comparison of diurnal patterns” [Energy Policy 32 (2004) 657–672]","year":2003,"lang":"en","type":"erratum","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Power (physics); Energy (signal processing); Economics; Environmental science; Natural resource economics; Environmental economics; Business; Mathematics; Thermodynamics; Physics; Statistics","score_opus":0.010548284690366267,"score_gpt":0.24373013421040718,"score_spread":0.23318184952004092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2050002896","genre_codex":"editorial","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0002902187,0.0035615987,0.00079651497,0.077400886,0.89557123,0.00011740128,0.005527107,0.00073558715,0.015999546],"genre_scores_gemma":[0.008496341,0.01304847,0.0037185384,0.18935704,0.1656096,0.0005508131,0.008762672,0.0014867715,0.60896975],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9944252,0.0007272455,0.0008593151,0.0006950138,0.0026057824,0.00068748643],"domain_scores_gemma":[0.9727429,0.0036455598,0.00086750806,0.0011721622,0.021100884,0.00047100356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003194617,0.0037137275,0.0050512054,0.006764934,0.0044564325,0.005505443,0.0059349956,0.0127777485,0.059828054],"category_scores_gemma":[0.03200787,0.0017399456,0.0037712601,0.007615742,0.0016990191,0.0030827615,0.002306266,0.009474595,0.043964203],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021500295,0.000009603365,0.000043988613,0.000056030065,0.0000072690627,0.000059031692,0.000010392015,0.000080431615,0.000023589977,0.00029505152,0.9973212,0.002071995],"study_design_scores_gemma":[0.00006835969,0.00005285486,0.004775563,0.0003793046,0.00010755124,0.00013691776,0.0001603082,0.00091449334,0.00039605098,0.0021765642,0.9907265,0.00010561122],"about_ca_topic_score_codex":0.21568531,"about_ca_topic_score_gemma":0.28160092,"teacher_disagreement_score":0.21568531,"about_ca_system_score_codex":0.009129686,"about_ca_system_score_gemma":0.0078952,"threshold_uncertainty_score":0.42885977},"labels":[],"label_agreement":null},{"id":"W2050003741","doi":"10.1109/tpwrs.2014.2336753","title":"Online Adaptive Real-Time Optimal Dispatch of Privately Owned Energy Storage Systems Using Public-Domain Electricity Market Prices","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University","funders":"","keywords":"Electricity market; Electricity; Revenue; Linear programming; Computer science; Economic dispatch; Energy storage; Mathematical optimization; Arbitrage; Economics; Operations research; Electric power system; Engineering; Finance; Algorithm; Mathematics","score_opus":0.011001363782216899,"score_gpt":0.20236840541635998,"score_spread":0.1913670416341431,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2050003741","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.65955484,0.0002582065,0.33192128,0.00027268482,0.00007237045,0.000107808315,0.00008794696,0.0003180876,0.007406781],"genre_scores_gemma":[0.9936538,0.000018920078,0.0059920866,0.000006162822,0.000004743979,0.00000904219,0.000015071791,0.0000049792297,0.00029516523],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997372,0.00008596527,0.000014374762,0.00004496835,0.00007245244,0.000045028897],"domain_scores_gemma":[0.9991528,0.0004906643,0.00015242481,0.00004956798,0.000118260075,0.000036275083],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007229552,0.00054685655,0.0006397058,0.00017515269,0.00017603958,0.00084167655,0.0006460198,0.00047396004,0.000828177],"category_scores_gemma":[0.0025863452,0.0002663595,0.00017416164,0.00023105858,0.00032535393,0.00089384714,0.000356563,0.000501531,0.00007656536],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013152565,0.000050264414,0.0007980173,0.00001991403,0.000010559613,0.000030137326,0.000012049018,0.9836699,0.0009823451,0.0013874188,0.00013712968,0.012770768],"study_design_scores_gemma":[0.000007795126,0.000016814864,0.00014756207,5.1228494e-7,0.0000017466467,0.0000026668738,0.0000037259983,0.9992848,0.00029679318,0.00018947454,0.000046863985,0.000001229168],"about_ca_topic_score_codex":0.007706385,"about_ca_topic_score_gemma":0.009675725,"teacher_disagreement_score":0.007706385,"about_ca_system_score_codex":0.0007933446,"about_ca_system_score_gemma":0.0010886146,"threshold_uncertainty_score":0.015323043},"labels":[],"label_agreement":null},{"id":"W2051556306","doi":"10.1109/tpwrs.2012.2235469","title":"Analysis of the Iberian Power Forward Price Formation","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Futures contract; Spot contract; Forward contract; Forward market; Common value auction; Maturity (psychological); Quarter (Canadian coin); Economics; Normal backwardation; Spot market; Financial economics; Futures market; Derivatives market; Business; Microeconomics; Electricity; Engineering","score_opus":0.004796734193670058,"score_gpt":0.1803990078667938,"score_spread":0.17560227367312375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2051556306","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95114714,0.0015255637,0.0039089085,0.00060932705,0.000046032288,0.00002771128,0.0013191818,0.00007966328,0.0413364],"genre_scores_gemma":[0.9905247,0.00049664336,0.0010966136,0.000043809796,0.000034416753,0.00001369939,0.001225285,0.000022310374,0.006542573],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99974734,0.000043392407,0.000010835972,0.00004943258,0.00009797429,0.000051068124],"domain_scores_gemma":[0.99910706,0.00030539944,0.0002338798,0.00006274579,0.00025363523,0.000037133483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010033887,0.00029970892,0.0003171379,0.0016142766,0.00028156713,0.001666618,0.00036801328,0.0005128879,0.0044231694],"category_scores_gemma":[0.0028000441,0.00017263854,0.00036968547,0.0011303109,0.00032345654,0.0008036428,0.00047156372,0.0006359848,0.0006966338],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0023175888,0.0005127433,0.28092444,0.00047657936,0.00044066343,0.0039476524,0.0015836803,0.24472634,0.014033634,0.18001375,0.019465523,0.25155747],"study_design_scores_gemma":[0.00008522543,0.00030729268,0.60931236,0.00019109344,0.00013682044,0.001269024,0.0012924456,0.3121068,0.009670662,0.020428753,0.045071922,0.00012758274],"about_ca_topic_score_codex":0.014142018,"about_ca_topic_score_gemma":0.0055858125,"teacher_disagreement_score":0.014142018,"about_ca_system_score_codex":0.0013682579,"about_ca_system_score_gemma":0.0005220882,"threshold_uncertainty_score":0.028119385},"labels":[],"label_agreement":null},{"id":"W2054097401","doi":"10.1109/eem.2012.6254726","title":"Challenges and opportunities of a trans-canadian grid","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"","keywords":"Reliability (semiconductor); Grid; Interconnection; Computer science; Power grid; Network topology; Point (geometry); Control (management); Reliability engineering; Power (physics); Operations research; Environmental economics; Risk analysis (engineering); Systems engineering; Engineering; Telecommunications; Business; Computer network; Mathematics","score_opus":0.05028495973642108,"score_gpt":0.2029757672812167,"score_spread":0.1526908075447956,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2054097401","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22457947,0.009778071,0.033628765,0.1428021,0.000784335,0.00015795798,0.0016351903,0.0002867318,0.58634734],"genre_scores_gemma":[0.95061964,0.0056175976,0.013189382,0.0027291032,0.00006326774,0.00003183636,0.00040108812,0.000038146944,0.027309962],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989299,0.00015917778,0.000020141088,0.00009456288,0.00043119906,0.0003650154],"domain_scores_gemma":[0.9990231,0.00007773827,0.000045951256,0.00003406689,0.000626044,0.00019302416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011180174,0.0003242967,0.0001865149,0.00047581238,0.0028787274,0.0037672834,0.0008564954,0.0009842818,0.0053384327],"category_scores_gemma":[0.0016489209,0.00014069071,0.00023827555,0.0015497316,0.001359801,0.0017252875,0.0012346697,0.0011308634,0.00029663],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002352967,0.00005618574,0.014488705,0.00030115922,0.000060964037,0.0016517902,0.001322244,0.060695685,0.0036541503,0.7065213,0.06750892,0.1435037],"study_design_scores_gemma":[0.00005220776,0.00013587586,0.02362943,0.00037568927,0.000099605524,0.001447524,0.020299323,0.07143057,0.0032759032,0.16514513,0.7139632,0.00014550642],"about_ca_topic_score_codex":0.8631087,"about_ca_topic_score_gemma":0.93515146,"teacher_disagreement_score":0.1368913,"about_ca_system_score_codex":0.016040552,"about_ca_system_score_gemma":0.032314677,"threshold_uncertainty_score":0.27539492},"labels":[],"label_agreement":null},{"id":"W2055886247","doi":"10.3138/cpp.v33.1.001","title":"The Potential for Electricity Market Restructuring in Quebec","year":2007,"lang":"en","type":"article","venue":"Canadian Public Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Center for Interuniversity Research and Analysis on Organizations; University of Alberta; HEC Montréal","funders":"","keywords":"Restructuring; Divestment; Hydroelectricity; Revenue; Electricity; Electricity market; Production (economics); Business; Economics; Market economy; Industrial organization; Natural resource economics; Microeconomics; Finance; Engineering","score_opus":0.004325274596356654,"score_gpt":0.201432071138736,"score_spread":0.19710679654237936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2055886247","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48149848,0.0031623726,0.0063104806,0.061665144,0.00037330927,0.00018747868,0.0013575575,0.00024093583,0.44520426],"genre_scores_gemma":[0.96582884,0.0005120233,0.0009979068,0.0027250464,0.000043239204,0.000026654758,0.00028130988,0.000012270844,0.029572627],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99938333,0.0000823239,0.0000076832775,0.0000485555,0.00011044632,0.0003676667],"domain_scores_gemma":[0.9992993,0.00010353102,0.000050130075,0.000028855226,0.00033552595,0.00018261619],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006037516,0.00016284165,0.00017766144,0.00041937156,0.0020653317,0.0022605495,0.0009256472,0.001336077,0.011347823],"category_scores_gemma":[0.0014794723,0.00013148313,0.00043302862,0.0004988551,0.0008559859,0.00087737094,0.0005303508,0.0009616984,0.00036098712],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005466035,0.00024203466,0.04941895,0.0002140224,0.00012047673,0.004998189,0.0011437439,0.09414901,0.009507971,0.59783596,0.118895285,0.12292785],"study_design_scores_gemma":[0.0004746467,0.00029469936,0.17810965,0.00022953529,0.00008599771,0.0008157885,0.004823954,0.15145272,0.002624904,0.060780436,0.6001102,0.00019759647],"about_ca_topic_score_codex":0.93722636,"about_ca_topic_score_gemma":0.96769375,"teacher_disagreement_score":0.062773645,"about_ca_system_score_codex":0.028162695,"about_ca_system_score_gemma":0.022587322,"threshold_uncertainty_score":0.20433563},"labels":[],"label_agreement":null},{"id":"W2058448998","doi":"10.1109/ccece.2012.6334860","title":"Multi-objective economic-emission optimal load dispatch using bacterial foraging algorithm","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Foraging; Mathematical optimization; Set (abstract data type); Convergence (economics); Minification; Computer science; Curse of dimensionality; Algorithm; Mathematics; Artificial intelligence; Ecology; Biology; Economics","score_opus":0.01160223559356267,"score_gpt":0.23360313577846284,"score_spread":0.22200090018490018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2058448998","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029658927,0.00073333865,0.9602465,0.00035692638,0.00007633922,0.00012634892,0.00010169128,0.00023536371,0.008464578],"genre_scores_gemma":[0.7540191,0.0007022119,0.2370173,0.00015514888,0.00008410694,0.00050624146,0.0002497264,0.00009766127,0.0071685202],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994011,0.0002286129,0.000028566383,0.000085528955,0.0001770456,0.00007910165],"domain_scores_gemma":[0.9995782,0.00023360032,0.00006193583,0.00001718273,0.0000756087,0.00003342354],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009638012,0.0014014383,0.0021381003,0.0008756233,0.0005792072,0.001453249,0.0012224977,0.0017071473,0.002567433],"category_scores_gemma":[0.0014832244,0.00063279906,0.0010246261,0.0010559572,0.00045986756,0.0009423825,0.00093947025,0.00089352607,0.0003260582],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017483748,0.000015133044,0.00009553786,0.000029460907,0.000018808787,0.00002678088,0.00001029018,0.9918189,0.00030298263,0.0016605078,0.00021320356,0.005790863],"study_design_scores_gemma":[0.0000062291665,0.000009197055,0.000030648374,0.0000027626947,0.000003067558,0.000003977514,0.0000032645269,0.99879634,0.000069428286,0.0008959053,0.0001767243,0.0000024805408],"about_ca_topic_score_codex":0.005570889,"about_ca_topic_score_gemma":0.0037408131,"teacher_disagreement_score":0.005570889,"about_ca_system_score_codex":0.0010164498,"about_ca_system_score_gemma":0.0015190946,"threshold_uncertainty_score":0.011076927},"labels":[],"label_agreement":null},{"id":"W2058602204","doi":"10.5430/air.v1n1p96","title":"Parallel hybrid enhanced inherited GA based scuc in a distributed cluster","year":2012,"lang":"en","type":"article","venue":"Artificial Intelligence Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Schedule; Economic dispatch; Power system simulation; Computer science; Genetic algorithm; Operator (biology); Mathematical optimization; Power (physics); Electric power system; Mathematics; Operating system","score_opus":0.0907725757499153,"score_gpt":0.3547781529685037,"score_spread":0.26400557721858836,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2058602204","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27754384,0.000323622,0.709342,0.00022581265,0.00008019046,0.00013648898,0.000084153246,0.0013533845,0.010910495],"genre_scores_gemma":[0.7957759,0.000097208576,0.19941884,0.000044537384,0.0000130451335,0.00016349886,0.00009968459,0.000075703225,0.0043115728],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997273,0.000089067194,0.000008254406,0.00005442165,0.00007806492,0.00004288609],"domain_scores_gemma":[0.9997155,0.00011629716,0.000027978289,0.00003937272,0.0000760869,0.000024775669],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044673975,0.0005903834,0.000693937,0.00036932176,0.00044415783,0.0006473489,0.0011696139,0.0006376797,0.0013636592],"category_scores_gemma":[0.0006988188,0.000275692,0.0005302719,0.00054739165,0.00049370027,0.00041842277,0.0006767084,0.00061367743,0.00019010999],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005592264,0.000025545787,0.0002243276,0.00001543441,0.000013868753,0.00004422853,0.000019094596,0.9841462,0.0015407323,0.0014949419,0.000264441,0.012155306],"study_design_scores_gemma":[0.000011652158,0.00001509202,0.00004682945,9.668223e-7,0.0000020264217,0.0000047313706,0.0000042447296,0.99907035,0.00030609878,0.000390528,0.00014591038,0.0000016002028],"about_ca_topic_score_codex":0.010967705,"about_ca_topic_score_gemma":0.00851497,"teacher_disagreement_score":0.010967705,"about_ca_system_score_codex":0.00082665455,"about_ca_system_score_gemma":0.0011161121,"threshold_uncertainty_score":0.02180773},"labels":[],"label_agreement":null},{"id":"W2061540587","doi":"10.1109/ccece.2006.277592","title":"Emission-Economic Dispatch using a Novel Constraint Handling Particle Swarm Optimization Strategy","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Particle swarm optimization; Mathematical optimization; Economic dispatch; Pareto principle; Robustness (evolution); Computer science; Constraint (computer-aided design); Optimization problem; Multi-objective optimization; Mathematics; Electric power system; Power (physics)","score_opus":0.01191603412234981,"score_gpt":0.21322206375606606,"score_spread":0.20130602963371624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2061540587","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0056418236,0.00009169866,0.99041045,0.00010113901,0.000041147057,0.00004139549,0.000019996183,0.0000975073,0.0035548972],"genre_scores_gemma":[0.49543622,0.00035294725,0.4966847,0.00018630443,0.00015627079,0.00033655745,0.00018838748,0.00008639473,0.006572247],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996543,0.00010053896,0.000021328404,0.000046085475,0.00015262322,0.000025121177],"domain_scores_gemma":[0.99976236,0.000109048626,0.00003856493,0.000019606854,0.000052508203,0.000017834273],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058119494,0.0007765652,0.0008195193,0.00043241377,0.0003461932,0.00079537136,0.00092712126,0.00093787827,0.0014540657],"category_scores_gemma":[0.000905352,0.00031415658,0.0006024325,0.000527626,0.0003588317,0.0006515231,0.00064700074,0.0006951854,0.00028063232],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004394566,0.000066896944,0.0002903544,0.000057344536,0.000055414625,0.00009632637,0.000037067766,0.93367714,0.0024568562,0.017200239,0.00143147,0.04458696],"study_design_scores_gemma":[0.00001380162,0.000013616535,0.000040939285,0.0000020678685,0.000004248278,0.000009018264,0.000001620045,0.9980021,0.00023463237,0.000955372,0.00071930833,0.0000031810366],"about_ca_topic_score_codex":0.002919838,"about_ca_topic_score_gemma":0.0024168224,"teacher_disagreement_score":0.002919838,"about_ca_system_score_codex":0.00040531406,"about_ca_system_score_gemma":0.0006831025,"threshold_uncertainty_score":0.005805731},"labels":[],"label_agreement":null},{"id":"W2061895839","doi":"10.6000/1929-6002.2014.03.03.6","title":"Transmission System Operation Challenges with Large Wind Penetration","year":2014,"lang":"en","type":"article","venue":"Journal of Technology Innovations in Renewable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Renewable energy; Wind power; Incentive; Electric power system; Transmission system; Engineering; Market penetration; Environmental science; Penetration (warfare); Computer science; Telecommunications; Electrical engineering; Transmission (telecommunications); Operations research; Power (physics); Economics","score_opus":0.004939244220721082,"score_gpt":0.18791620907785608,"score_spread":0.182976964857135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2061895839","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.64606035,0.0040240316,0.2543409,0.009252127,0.0005372764,0.00020314158,0.0015340747,0.001151628,0.08289648],"genre_scores_gemma":[0.9916088,0.0006500288,0.004786197,0.00019561204,0.00011716307,0.000025074733,0.0001619239,0.000049533333,0.0024057068],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994861,0.00018471808,0.00003319436,0.00008528177,0.00014399529,0.000066586086],"domain_scores_gemma":[0.9986187,0.000807682,0.00017813696,0.00005666055,0.00027862395,0.000060236776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00070825865,0.00047806025,0.00051369815,0.00025947075,0.00051104405,0.0011401962,0.00051454175,0.0007951455,0.0051591927],"category_scores_gemma":[0.0022603807,0.0003320685,0.00029232723,0.0004515964,0.0003062209,0.0014231631,0.00046599575,0.0012948256,0.00061327225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002170445,0.00012474497,0.012574122,0.00055428327,0.00015946057,0.0043647345,0.0005485693,0.8530608,0.014134871,0.01982863,0.018821752,0.075611085],"study_design_scores_gemma":[0.000066590204,0.0004265825,0.021697503,0.00012108319,0.00011105042,0.0031859444,0.0019826572,0.92047375,0.0036217868,0.031152748,0.017051136,0.00010927496],"about_ca_topic_score_codex":0.005901192,"about_ca_topic_score_gemma":0.0065577663,"teacher_disagreement_score":0.005901192,"about_ca_system_score_codex":0.0005686325,"about_ca_system_score_gemma":0.00038894627,"threshold_uncertainty_score":0.01725924},"labels":[],"label_agreement":null},{"id":"W2063317738","doi":"10.6000/1929-6002.2014.03.03.3","title":"Generation Scheduling in Power Systems with Hydro Electric Plants","year":2014,"lang":"en","type":"article","venue":"Journal of Technology Innovations in Renewable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electrical engineering; Environmental science; Computer science; Automotive engineering; Engineering","score_opus":0.007292977366765218,"score_gpt":0.20044931303182123,"score_spread":0.19315633566505602,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2063317738","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15249251,0.00096368726,0.83584297,0.0004036675,0.00008906813,0.00010549551,0.00016297399,0.00016537333,0.009774221],"genre_scores_gemma":[0.9762788,0.00030577494,0.02029942,0.00002022089,0.000029786572,0.00004580847,0.000050250295,0.000020038307,0.002949913],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998074,0.0000891913,0.000005978762,0.000033571014,0.00003242081,0.000031473894],"domain_scores_gemma":[0.9997569,0.0001518831,0.000038064572,0.000007698979,0.000019471965,0.000026106016],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040022517,0.00042363894,0.0003811111,0.00019927905,0.00041224385,0.000535968,0.00048538248,0.00043848506,0.0017785329],"category_scores_gemma":[0.0009047558,0.00031941212,0.00023096168,0.0006018545,0.0003242939,0.00055765203,0.0004301795,0.00047611952,0.00015520108],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045013607,0.000015939991,0.00026499017,0.0000246947,0.000007071919,0.00008936185,0.000013224008,0.9855769,0.00056379946,0.0046861167,0.0003092066,0.008403605],"study_design_scores_gemma":[0.000008070335,0.000024610395,0.00013452071,0.0000018263994,0.0000025878433,0.000014203268,0.000011317041,0.99570566,0.00013397608,0.0035982192,0.00036286944,0.0000022173786],"about_ca_topic_score_codex":0.0072028283,"about_ca_topic_score_gemma":0.008765393,"teacher_disagreement_score":0.0072028283,"about_ca_system_score_codex":0.0007462018,"about_ca_system_score_gemma":0.00075412565,"threshold_uncertainty_score":0.014321804},"labels":[],"label_agreement":null},{"id":"W2067755615","doi":"10.1109/naps.2012.6336376","title":"Frequency regulation services: A comparative study of select North American and European reserve markets","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Procurement; Electricity; Business; Quality (philosophy); Service (business); Electricity market; Industrial organization; Marketing; Engineering","score_opus":0.01228375453937455,"score_gpt":0.2229072884483076,"score_spread":0.21062353390893304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2067755615","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94556946,0.013386689,0.00090757635,0.00043388095,0.000026788623,0.000028857077,0.00078962446,0.00001743475,0.03883963],"genre_scores_gemma":[0.9915017,0.00529871,0.00036554856,0.00010801886,0.00003685827,0.000009766469,0.00079299504,0.000007128639,0.0018791659],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994141,0.00017390023,0.000040345207,0.00007543626,0.00022310608,0.00007303735],"domain_scores_gemma":[0.99826497,0.00084252376,0.00049585255,0.00003488667,0.00027006745,0.00009170094],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001129416,0.00016000055,0.00023812769,0.002485963,0.0003107278,0.0014459353,0.00025061794,0.00027242745,0.0022239094],"category_scores_gemma":[0.0019623945,0.00009113864,0.00033109993,0.0049940795,0.0003506371,0.0011265455,0.00035368837,0.00024821778,0.00022788766],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002372438,0.00075506844,0.51715195,0.0020782887,0.00088624866,0.0026782064,0.0048592207,0.02316853,0.0030137224,0.0631699,0.020775165,0.35909134],"study_design_scores_gemma":[0.000050770526,0.00035674288,0.9395874,0.00028275588,0.00021748648,0.00071743916,0.0053020427,0.0064916993,0.000802938,0.0018151887,0.044329766,0.000045747736],"about_ca_topic_score_codex":0.013399001,"about_ca_topic_score_gemma":0.025765376,"teacher_disagreement_score":0.013399001,"about_ca_system_score_codex":0.0011157187,"about_ca_system_score_gemma":0.00073036767,"threshold_uncertainty_score":0.026642025},"labels":[],"label_agreement":null},{"id":"W2067967009","doi":"10.1016/j.ijpe.2010.10.007","title":"Financial and operational decisions in the electricity sector: Contract portfolio optimization with the conditional value-at-risk criterion","year":2010,"lang":"en","type":"article","venue":"International Journal of Production Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canada Research Chairs; University of New Brunswick; University of Toronto","funders":"","keywords":"CVAR; Expected shortfall; Forward contract; Stochastic programming; Procurement; Portfolio; Hedge; Value at risk; Portfolio optimization; Risk management; Volatility (finance); Electricity; Robust optimization; Microeconomics; Computer science; Economics; Business; Mathematical optimization; Actuarial science; Finance; Futures contract","score_opus":0.005308610124878929,"score_gpt":0.20585211258120406,"score_spread":0.20054350245632513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2067967009","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32909223,0.0021812408,0.6502984,0.0059317383,0.0001614503,0.00019526809,0.0004804307,0.00015881802,0.011500356],"genre_scores_gemma":[0.9696838,0.0008710847,0.024438329,0.00015555733,0.00013780432,0.00009713311,0.00025748133,0.00007593965,0.0042827823],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973017,0.0019655034,0.000075333985,0.00021871911,0.00024959526,0.00018915389],"domain_scores_gemma":[0.98338544,0.014049958,0.00088560564,0.00028723644,0.00063038804,0.0007614141],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009050524,0.0014987591,0.0026002242,0.0011509992,0.0005893804,0.0028119055,0.0013421151,0.0032408596,0.0025211677],"category_scores_gemma":[0.025178595,0.0011809618,0.00088609994,0.0012322013,0.002138248,0.0041885204,0.0019448828,0.0028282795,0.0002130238],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016039245,0.00009019469,0.0009913051,0.00005256792,0.00006001991,0.000086343156,0.000027001233,0.96097606,0.00019342836,0.030698556,0.00088623184,0.005777872],"study_design_scores_gemma":[0.000023574072,0.000037326026,0.00027715694,0.000009536866,0.000014012324,0.000015025861,0.00001204974,0.9801983,0.00008394615,0.019204,0.00011344113,0.000011584718],"about_ca_topic_score_codex":0.006273575,"about_ca_topic_score_gemma":0.0033968803,"teacher_disagreement_score":0.009050524,"about_ca_system_score_codex":0.0016336706,"about_ca_system_score_gemma":0.0032647762,"threshold_uncertainty_score":0.04786426},"labels":[],"label_agreement":null},{"id":"W2069999654","doi":"10.1016/j.eneco.2014.09.001","title":"Efficiency assessment of hydroelectric power plants in Canada: A multi criteria decision making approach","year":2014,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa","funders":"National Key Research and Development Program of China; China Scholarship Council; National Natural Science Foundation of China","keywords":"Hydropower; Environmental economics; Viewpoints; Efficient energy use; Electricity generation; Business; Profitability index; Renewable energy; Economic efficiency; Production (economics); Electricity; Economics; Environmental resource management; Power (physics); Engineering; Finance; Microeconomics","score_opus":0.005290216809612416,"score_gpt":0.20059297862513975,"score_spread":0.19530276181552733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2069999654","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94892186,0.00066314597,0.03341839,0.0009645229,0.000026173031,0.00029543674,0.0010327561,0.00009148957,0.014586339],"genre_scores_gemma":[0.99122435,0.00015248662,0.0061104163,0.000024194514,0.0000035566395,0.000027681828,0.0001952686,0.0000130342605,0.0022490148],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982268,0.00048261904,0.00006628172,0.00012246448,0.00070224475,0.00039960266],"domain_scores_gemma":[0.99827754,0.0007040202,0.00011141879,0.000032163243,0.0007274642,0.00014736905],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025102466,0.00077556574,0.00085857825,0.0021230096,0.001603515,0.0031072088,0.0012949463,0.0009334721,0.0013330322],"category_scores_gemma":[0.0039926292,0.0004764348,0.0008610287,0.0021095183,0.00090344326,0.00071666937,0.0006911502,0.00078067573,0.0000985517],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002545187,0.00014551345,0.01635916,0.00010104551,0.00010016848,0.00018488275,0.00012295344,0.950214,0.0010796803,0.004761157,0.001226703,0.02545029],"study_design_scores_gemma":[0.00003474078,0.00006733616,0.024861436,0.000044180524,0.000053457363,0.000023421686,0.0007539552,0.96881735,0.0015502071,0.0023531327,0.0013895337,0.00005125133],"about_ca_topic_score_codex":0.915995,"about_ca_topic_score_gemma":0.93575734,"teacher_disagreement_score":0.084005,"about_ca_system_score_codex":0.033814244,"about_ca_system_score_gemma":0.023902137,"threshold_uncertainty_score":0.24534065},"labels":[],"label_agreement":null},{"id":"W2070544587","doi":"10.5539/ass.v8n3p3","title":"Benchmarking Electric Distribution Utilities in the Philippines","year":2012,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Yardstick; Benchmarking; Flexibility (engineering); Competition (biology); Distribution (mathematics); Commission; Benchmark (surveying); Economics; Business; Industrial organization; Public economics; Microeconomics; Environmental economics; Marketing; Finance","score_opus":0.00825239921251893,"score_gpt":0.22667661945140688,"score_spread":0.21842422023888794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2070544587","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9787486,0.00034850775,0.0034102532,0.00045340505,0.0000083613095,0.000055247576,0.0011501594,0.00015735418,0.015668012],"genre_scores_gemma":[0.99816173,0.000091885784,0.00053828245,0.000019503332,0.0000032427617,0.000018328761,0.00040532168,0.000010083352,0.00075161783],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99747235,0.001445086,0.00008429136,0.00024868487,0.00050090055,0.00024858222],"domain_scores_gemma":[0.99445385,0.0021114906,0.0011844005,0.0005145648,0.0014914067,0.0002442895],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002734807,0.0004609498,0.00043212084,0.0014823349,0.000398985,0.0018991142,0.00089545135,0.0005111122,0.0021736524],"category_scores_gemma":[0.009721744,0.00021829076,0.0002693299,0.0038218847,0.0007565003,0.0016194336,0.0011192332,0.0006174101,0.0002414095],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003159927,0.00037612696,0.20755091,0.00033988827,0.00016537351,0.000659854,0.0009790102,0.7141773,0.00089294586,0.01977211,0.0059089926,0.048861526],"study_design_scores_gemma":[0.00010305864,0.0006128369,0.30978894,0.000106002226,0.000070349764,0.00019516329,0.0045830887,0.656265,0.002768684,0.0098074665,0.015587927,0.00011138568],"about_ca_topic_score_codex":0.07038483,"about_ca_topic_score_gemma":0.057195377,"teacher_disagreement_score":0.07038483,"about_ca_system_score_codex":0.004715683,"about_ca_system_score_gemma":0.0014785674,"threshold_uncertainty_score":0.13995028},"labels":[],"label_agreement":null},{"id":"W2070915220","doi":"10.1109/epec.2011.6070192","title":"Bacterial foraging algorithm for optimum economic-emission dispatch","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Foraging; Mathematical optimization; Convergence (economics); Curse of dimensionality; Computer science; Economic dispatch; Evolutionary algorithm; Power (physics); Algorithm; Electric power system; Mathematics; Artificial intelligence; Ecology; Economics","score_opus":0.011620334737992084,"score_gpt":0.20084702590392842,"score_spread":0.18922669116593632,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2070915220","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0070017097,0.0009733411,0.985105,0.0001943135,0.000088554014,0.000057307858,0.000033424505,0.00016420455,0.00638221],"genre_scores_gemma":[0.3118653,0.0016142023,0.6769051,0.00012932919,0.000093613184,0.0004934494,0.00017027406,0.00012310725,0.008605606],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996642,0.00013754652,0.000015961603,0.000033625478,0.000121699995,0.00002695048],"domain_scores_gemma":[0.99977523,0.00012082659,0.00002151662,0.000013404897,0.000057932826,0.000011009147],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006489837,0.0009243552,0.0010228993,0.00050155376,0.0004136691,0.0005286303,0.00066795584,0.0009887208,0.0023208493],"category_scores_gemma":[0.0015040911,0.0002968167,0.0005063373,0.00063668494,0.00039101107,0.0005949646,0.0005317666,0.0007954877,0.00058278476],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045067114,0.000024501911,0.00019951123,0.0000725028,0.00003299442,0.000043584925,0.00003453752,0.92463005,0.0016304664,0.017212678,0.0015818726,0.054492224],"study_design_scores_gemma":[0.000015778644,0.00001810708,0.000054941156,0.000008138332,0.0000041586395,0.000013574088,0.0000042964716,0.99303883,0.0002554052,0.0044550872,0.0021263754,0.000005260744],"about_ca_topic_score_codex":0.0028777774,"about_ca_topic_score_gemma":0.0018040807,"teacher_disagreement_score":0.0028777774,"about_ca_system_score_codex":0.00057676976,"about_ca_system_score_gemma":0.0009087065,"threshold_uncertainty_score":0.0077640414},"labels":[],"label_agreement":null},{"id":"W2071941548","doi":"10.1049/iet-rpg:20070082","title":"Impact of wind generation control strategies, penetration level and installation location on electricity market prices","year":2008,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Electric Power System Optimization","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity market; Wind power; Electric power system; Electricity; Market clearing; Stand-alone power system; Clearing; Power flow; Electricity generation; Computer science; Environmental economics; Business; Distributed generation; Economics; Engineering; Microeconomics; Power (physics); Renewable energy; Electrical engineering; Finance","score_opus":0.022430409115758068,"score_gpt":0.2287546829620683,"score_spread":0.20632427384631025,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2071941548","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9874538,0.00014453643,0.0071457783,0.0001313712,0.000019057525,0.00002811469,0.000120661665,0.000031527066,0.004925062],"genre_scores_gemma":[0.9990509,0.000052898464,0.000566217,0.0000114388195,0.0000032383537,0.0000055093083,0.00002344657,0.00000767878,0.0002786664],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993292,0.0003507269,0.000031945987,0.00006527455,0.000088320594,0.00013459091],"domain_scores_gemma":[0.99336445,0.005515184,0.00048846396,0.0001341018,0.00033513017,0.00016272314],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013885617,0.0005666386,0.0005350987,0.0004295101,0.00021256707,0.0013735357,0.000527493,0.0007063968,0.0019152336],"category_scores_gemma":[0.0077676033,0.0004164123,0.00038336831,0.0005515361,0.000550867,0.0016312173,0.0004040489,0.00068218197,0.00019511076],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007878013,0.00039297837,0.00996126,0.00008179397,0.000104714905,0.00066417066,0.000036258632,0.9666499,0.0057757418,0.0030636361,0.0003717656,0.01211006],"study_design_scores_gemma":[0.00011625705,0.00052312406,0.015729474,0.000011729368,0.00011486645,0.00013674569,0.00012380208,0.9761914,0.004247865,0.0025112494,0.00025620556,0.0000372899],"about_ca_topic_score_codex":0.0027817953,"about_ca_topic_score_gemma":0.0040556956,"teacher_disagreement_score":0.0027817953,"about_ca_system_score_codex":0.00055802206,"about_ca_system_score_gemma":0.0003874082,"threshold_uncertainty_score":0.0073435307},"labels":[],"label_agreement":null},{"id":"W2073064074","doi":"10.1109/tpwrs.2012.2233502","title":"Managing Uncertainty of Wind Energy With Wind Generators Cooperative","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Renewable energy; Wind power; Variable renewable energy; Electricity; Tariff; Economics; Sensitivity (control systems); Smoothing; Incentive; Environmental economics; Computer science; Electric power system; Econometrics; Engineering; Microeconomics; Power (physics); Electrical engineering","score_opus":0.004823537202650046,"score_gpt":0.17470068908952288,"score_spread":0.16987715188687283,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2073064074","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79683733,0.00030309855,0.17482588,0.001086949,0.000045663128,0.0002426815,0.0005825325,0.00019532203,0.025880411],"genre_scores_gemma":[0.9961875,0.00005289485,0.0026909758,0.000017723216,0.0000044925046,0.000021204753,0.00005360688,0.000007928164,0.0009637545],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987692,0.00053648074,0.00003553899,0.00015699916,0.0003157422,0.00018606437],"domain_scores_gemma":[0.9971137,0.0018991753,0.00039122204,0.0001665385,0.00033468963,0.000094651994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021346668,0.0007040526,0.0007208796,0.00043892587,0.0006688034,0.0016980991,0.0012113913,0.0011613418,0.0012984364],"category_scores_gemma":[0.005280069,0.00052436313,0.00054772146,0.00073529035,0.00092894805,0.00165093,0.0010979207,0.001114804,0.000114026],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040937248,0.000017155846,0.001249534,0.0000075673593,0.000018361496,0.000081174185,0.000024334868,0.99217415,0.00020406702,0.003957458,0.00016870319,0.002056645],"study_design_scores_gemma":[0.00002157465,0.000057621462,0.0007956981,0.0000034856566,0.000018014332,0.000022814836,0.000064050386,0.99415815,0.00024965635,0.004012707,0.0005830683,0.000013117198],"about_ca_topic_score_codex":0.08672238,"about_ca_topic_score_gemma":0.09124099,"teacher_disagreement_score":0.08672238,"about_ca_system_score_codex":0.0033177335,"about_ca_system_score_gemma":0.002401893,"threshold_uncertainty_score":0.17243516},"labels":[],"label_agreement":null},{"id":"W2074210939","doi":"10.1016/j.epsr.2007.12.005","title":"Balancing risk and cost in fuzzy economic dispatch including wind power penetration based on particle swarm optimization","year":2008,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":133,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Pratt and Whitney Canada; National Science Foundation","keywords":"Wind power; Economic dispatch; Particle swarm optimization; Renewable energy; Electric power system; Reliability engineering; Fuzzy logic; Computer science; Energy security; Mathematical optimization; Engineering; Power (physics); Electrical engineering; Mathematics","score_opus":0.025975979711213865,"score_gpt":0.2741216598409217,"score_spread":0.2481456801297078,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2074210939","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22781093,0.00047871866,0.7649138,0.00091969926,0.00017015597,0.0000728399,0.000064681,0.00010909076,0.005460097],"genre_scores_gemma":[0.98066026,0.00009698527,0.017802868,0.000029612112,0.00004319073,0.000036701178,0.000017588336,0.000024461502,0.0012883799],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993111,0.00038984598,0.00002998839,0.000061806364,0.00013784927,0.00006943525],"domain_scores_gemma":[0.99742955,0.0020230147,0.00019681678,0.00006601363,0.0001969407,0.0000877091],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026351458,0.0008205739,0.0015086863,0.0005747917,0.00050043507,0.0016246707,0.0009560643,0.0013017247,0.0010615744],"category_scores_gemma":[0.0068917004,0.00087518495,0.00057310454,0.0005831223,0.0007522481,0.0018238262,0.000666655,0.0011404869,0.0000771061],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005155141,0.0000147363535,0.00022358961,0.000012514491,0.000025647156,0.000026909383,0.000012878944,0.99232167,0.00012150248,0.004333722,0.00010620896,0.0027491045],"study_design_scores_gemma":[0.000007668141,0.000007812359,0.00010803674,0.0000014205982,0.0000056174076,0.0000030818244,0.000003512921,0.9982395,0.000029892308,0.0015667717,0.000024493602,0.0000021632202],"about_ca_topic_score_codex":0.006091361,"about_ca_topic_score_gemma":0.00460203,"teacher_disagreement_score":0.006091361,"about_ca_system_score_codex":0.0012698253,"about_ca_system_score_gemma":0.000736312,"threshold_uncertainty_score":0.013936162},"labels":[],"label_agreement":null},{"id":"W2075548088","doi":"10.1109/cjece.2014.2359249","title":"Energy Reserve Trade Optimization for Wind Generators Using Black and Scholes Options in Small-Size Power Systems","year":2015,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Wind power; Renewable energy; Electric power system; Procurement; Computer science; Mathematical optimization; Environmental economics; Economics; Power (physics); Engineering; Electrical engineering; Mathematics","score_opus":0.014442499505428065,"score_gpt":0.1803252716876712,"score_spread":0.16588277218224315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2075548088","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28681493,0.0013750198,0.69604754,0.0018741797,0.00008788456,0.00006594596,0.00014338273,0.00018714888,0.013403952],"genre_scores_gemma":[0.9863028,0.00030514787,0.008702803,0.000052689407,0.000023975337,0.000054041622,0.000044915534,0.000033655968,0.004479969],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965394,0.00020559564,0.000012059385,0.000039745963,0.000047735382,0.00004088525],"domain_scores_gemma":[0.9989525,0.0007844804,0.00010811411,0.000023935057,0.000064010725,0.00006686379],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017316121,0.0010063009,0.0011446658,0.0004412605,0.00036383452,0.0016968594,0.0006039983,0.0012719544,0.0021549228],"category_scores_gemma":[0.0032455223,0.0006690615,0.0007033806,0.000377012,0.001375566,0.0013799237,0.0009514205,0.0010840482,0.00013458701],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038072438,0.000020654214,0.00025037152,0.000019572703,0.000018663513,0.00006669691,0.000018048355,0.9864784,0.00033562444,0.010676351,0.00019432977,0.001883199],"study_design_scores_gemma":[0.00000550568,0.000008541566,0.000037932572,0.0000018450971,0.0000025339377,0.0000024273984,0.0000042658603,0.99774003,0.000041210653,0.0021075117,0.00004609885,0.000002177795],"about_ca_topic_score_codex":0.0058404845,"about_ca_topic_score_gemma":0.0047213957,"teacher_disagreement_score":0.0058404845,"about_ca_system_score_codex":0.0009156068,"about_ca_system_score_gemma":0.0010399048,"threshold_uncertainty_score":0.011612952},"labels":[],"label_agreement":null},{"id":"W2076306265","doi":"10.1109/pmaps.2006.360245","title":"Probabilistic Optimal Power Flow Applications to Electricity Markets","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; University of Calgary","funders":"","keywords":"Probabilistic logic; Monte Carlo method; Computer science; Mathematical optimization; Electricity market; Context (archaeology); Electricity; Power flow; Electric power system; Point (geometry); AC power; Power (physics); Mathematics; Engineering; Artificial intelligence; Statistics","score_opus":0.0033631217755519557,"score_gpt":0.18720475968732792,"score_spread":0.18384163791177596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2076306265","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004068297,0.0004167038,0.9919891,0.00027125582,0.00004450721,0.000021062891,0.000019547899,0.00011279418,0.0030567097],"genre_scores_gemma":[0.56394416,0.0016619897,0.430429,0.00019356584,0.00031392134,0.00024043593,0.000107393505,0.00015463337,0.0029548667],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991208,0.0005104033,0.000023636872,0.000065981934,0.00024396549,0.00003535142],"domain_scores_gemma":[0.99577445,0.0036349476,0.00015867874,0.000120463876,0.00026946844,0.000041933716],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001982831,0.00078259746,0.0010448945,0.0008393904,0.00051327015,0.00078390737,0.0008243616,0.0010565786,0.0032069692],"category_scores_gemma":[0.009548075,0.00043223266,0.0006285689,0.0011098472,0.00090998935,0.0012235938,0.0009320515,0.0011657042,0.00023692173],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001570922,0.00001443708,0.00011590804,0.00004695192,0.000010979005,0.000024439401,0.000023686192,0.9249594,0.00025505645,0.051077977,0.00050367904,0.022951711],"study_design_scores_gemma":[0.000006431386,0.000006137351,0.0000519371,0.000006110824,0.0000016115354,0.00001264803,0.0000036482472,0.97349125,0.000110131026,0.025320863,0.000985791,0.0000034180196],"about_ca_topic_score_codex":0.004100023,"about_ca_topic_score_gemma":0.0028559244,"teacher_disagreement_score":0.004100023,"about_ca_system_score_codex":0.00066410104,"about_ca_system_score_gemma":0.0011090778,"threshold_uncertainty_score":0.010728359},"labels":[],"label_agreement":null},{"id":"W2077260410","doi":"10.1109/tdc.2010.5484305","title":"Grid expansion planning considering probabilistic production and congestion costs based on nodal effective load model","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"KEPCO Research Institute; Korea Electric Power Corporation","keywords":"Grid; Probabilistic logic; Computer science; Production (economics); Production planning; NODAL; Artificial intelligence; Mathematics","score_opus":0.006609615789227094,"score_gpt":0.20871918261001648,"score_spread":0.2021095668207894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2077260410","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10892261,0.00009000062,0.8783834,0.00017639155,0.000014425554,0.000080578386,0.00018847002,0.00016560122,0.011978553],"genre_scores_gemma":[0.93126523,0.0001426699,0.06534686,0.000017286015,0.000009567552,0.00014582329,0.0001750487,0.000065351625,0.0028322258],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937207,0.0003408953,0.000014747836,0.000056082194,0.00015999124,0.000056220728],"domain_scores_gemma":[0.99947065,0.00033823308,0.000050300834,0.000029892492,0.0000748713,0.000036144746],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007077222,0.0005562336,0.0005889943,0.00074892637,0.00029964605,0.0007877515,0.0010183632,0.0005351071,0.0031214042],"category_scores_gemma":[0.0017325355,0.0005160654,0.0005035868,0.00083776785,0.00049391657,0.0012849529,0.0004490917,0.00055365684,0.00018867453],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000065222125,0.0000022316774,0.000051075596,0.0000024684261,0.0000023857751,0.000011437499,0.0000037960444,0.99704736,0.000082186016,0.0020274797,0.000028873787,0.0007341714],"study_design_scores_gemma":[0.000002734321,0.0000057812263,0.0000334329,9.348542e-7,0.0000019160643,0.000003487588,0.0000037833588,0.9985708,0.000062832616,0.0012290039,0.00008342351,0.0000018771758],"about_ca_topic_score_codex":0.0072811428,"about_ca_topic_score_gemma":0.010293877,"teacher_disagreement_score":0.0072811428,"about_ca_system_score_codex":0.0012691602,"about_ca_system_score_gemma":0.00091220863,"threshold_uncertainty_score":0.014477551},"labels":[],"label_agreement":null},{"id":"W2078600216","doi":"10.1109/pes.2010.5589468","title":"Discrete monkey algorithm and its application in transmission network expansion planning","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"Tsinghua University","keywords":"Climb; Jump; Process (computing); Mathematical optimization; Computer science; Algorithm; Representation (politics); Transmission (telecommunications); Population; Optimization problem; Mathematics; Engineering","score_opus":0.0040032846243470655,"score_gpt":0.20782446314069983,"score_spread":0.20382117851635276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078600216","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021767894,0.00042564105,0.9721939,0.0002871453,0.000056033747,0.00003137446,0.000029141427,0.0002519813,0.0049569705],"genre_scores_gemma":[0.5376935,0.000755993,0.455166,0.00019014462,0.00007637326,0.0003112759,0.000109828026,0.00011709567,0.005579725],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99981517,0.000087160006,0.000006493953,0.000025437004,0.000052577623,0.000013219545],"domain_scores_gemma":[0.99954444,0.00030622186,0.000030339766,0.000028936276,0.00006440299,0.000025596251],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048685254,0.00036371071,0.0006129812,0.00036410344,0.00035087334,0.00046344483,0.00048021937,0.0006450444,0.0021741507],"category_scores_gemma":[0.0017155085,0.00022387823,0.00035984092,0.0006397003,0.00051871047,0.00057924277,0.0005546707,0.00068077166,0.0002168879],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006969154,0.000026626889,0.00059851946,0.000061646846,0.000031840693,0.00007579091,0.000050826522,0.9012145,0.002353457,0.028172087,0.0012662829,0.06607886],"study_design_scores_gemma":[0.000010072086,0.000024151359,0.000045532845,0.0000023325658,0.0000021716394,0.000021318398,0.0000037521775,0.9952928,0.00025562168,0.003236491,0.0011032657,0.000002586203],"about_ca_topic_score_codex":0.0022954536,"about_ca_topic_score_gemma":0.0014467514,"teacher_disagreement_score":0.0022954536,"about_ca_system_score_codex":0.00034763917,"about_ca_system_score_gemma":0.00060884113,"threshold_uncertainty_score":0.007273197},"labels":[],"label_agreement":null},{"id":"W2078899691","doi":"10.20430/ete.v79i315.70","title":"Optimación de las redes de trasmisión eléctrica en Norteamérica. Teoría y aplicaciones","year":2012,"lang":"es","type":"article","venue":"El Trimestre Económico","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Physics; Political science; Operator splitting; Philosophy; Mathematics","score_opus":0.005509203580979835,"score_gpt":0.24902131538178307,"score_spread":0.24351211180080323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078899691","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.539378,0.005021029,0.37129343,0.001357302,0.0002428526,0.00038880957,0.0007608323,0.0026148385,0.078942984],"genre_scores_gemma":[0.95526904,0.0008101674,0.032417297,0.00006021622,0.000016555248,0.00006771597,0.00018509277,0.00008264624,0.011091305],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9997266,0.000069187496,0.000008144458,0.000058976544,0.00008746328,0.00004962152],"domain_scores_gemma":[0.9996208,0.00011044981,0.00003852058,0.000029113375,0.0001780063,0.00002312711],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009012012,0.0009140649,0.00034002017,0.00049446535,0.00043111152,0.0015315652,0.00057158177,0.00052640005,0.0042456193],"category_scores_gemma":[0.0017321134,0.0004131806,0.00035674527,0.00042603503,0.00026129096,0.00095990556,0.00035448026,0.00051906955,0.00068010506],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003056373,0.000091317874,0.0070388564,0.00022212951,0.00006899796,0.00013969948,0.00021753524,0.7934116,0.014498479,0.0054175616,0.002746339,0.17584181],"study_design_scores_gemma":[0.00007993848,0.00032225225,0.0083787115,0.00009874784,0.00009429849,0.000066580724,0.00033981632,0.95894456,0.009342762,0.0032480976,0.019055791,0.000028484981],"about_ca_topic_score_codex":0.03091603,"about_ca_topic_score_gemma":0.057685032,"teacher_disagreement_score":0.03091603,"about_ca_system_score_codex":0.0019607982,"about_ca_system_score_gemma":0.0011776641,"threshold_uncertainty_score":0.061472178},"labels":[],"label_agreement":null},{"id":"W2079593790","doi":"10.1016/j.tej.2007.10.005","title":"Export Demand Response in the Ontario Electricity Market","year":2007,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity market; Mains electricity; Economics; Supply and demand; Mean reversion; Industrial organization; Business; Electricity retailing; Demand shock; Electricity price; Electricity demand; Monetary economics; Market economy; International economics; Commerce; Microeconomics; Electricity generation; Financial economics; Power (physics); Engineering","score_opus":0.007685336472541902,"score_gpt":0.21026686772912245,"score_spread":0.20258153125658054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2079593790","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9790791,0.00010879583,0.00022293266,0.0017014157,0.000013451255,0.0000120713175,0.0008770404,0.000021959542,0.017963259],"genre_scores_gemma":[0.992683,0.000069933536,0.000064244676,0.00006545564,0.000007404893,0.0000027283957,0.00037749077,0.000010160874,0.006719509],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99973243,0.00004441538,0.000009545167,0.000029677369,0.00008157499,0.000102349586],"domain_scores_gemma":[0.99874794,0.000398971,0.00017690763,0.00004547213,0.00043479903,0.00019582562],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005066784,0.00015932064,0.00041796832,0.00035773715,0.0010435127,0.0017922806,0.00051421963,0.000716737,0.00693833],"category_scores_gemma":[0.0033936002,0.0002003643,0.00028760248,0.00070920185,0.0006485701,0.00077862747,0.0004340126,0.0006347637,0.0004320996],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0053616134,0.0004920414,0.6712079,0.00030009638,0.00022846945,0.0028921883,0.0076840715,0.12443545,0.010454917,0.060704418,0.08280135,0.033437505],"study_design_scores_gemma":[0.00024986174,0.00015874168,0.7856973,0.000028460894,0.0000765025,0.00017676264,0.014075648,0.16558586,0.0014582919,0.006990805,0.025402453,0.00009927313],"about_ca_topic_score_codex":0.8798871,"about_ca_topic_score_gemma":0.9460423,"teacher_disagreement_score":0.120112896,"about_ca_system_score_codex":0.013308507,"about_ca_system_score_gemma":0.004106414,"threshold_uncertainty_score":0.24164051},"labels":[],"label_agreement":null},{"id":"W2080878608","doi":"10.5547/issn0195-6574-ej-vol29-no4-2","title":"High Frequency Export and Price Responses in the Ontario Electricity Market","year":2008,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Independent Electricity System Operator; University of Toronto","funders":"","keywords":"Electricity; Electricity market; Electricity price; Economics; Shock (circulatory); Supply shock; Monetary economics; Event study; Mains electricity; Supply and demand; Business; Industrial organization; Econometrics; Microeconomics; Monetary policy","score_opus":0.008391294873393688,"score_gpt":0.1780376288446655,"score_spread":0.16964633397127182,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2080878608","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9965816,0.000032363703,0.0006834745,0.00011221002,0.0000030678545,0.0000054521433,0.00022051163,0.000010247562,0.0023510542],"genre_scores_gemma":[0.99926084,0.000027527327,0.000078455836,0.000006449038,0.0000019726353,0.0000013599847,0.00009903219,0.000001577643,0.00052270776],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9998368,0.00002881903,0.0000070830465,0.000023893363,0.00006417067,0.00003926608],"domain_scores_gemma":[0.9994869,0.00019819774,0.0001460081,0.000033271022,0.000092140974,0.000043475156],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033280186,0.00012205512,0.00017682437,0.00028583032,0.0002810803,0.0005793174,0.00022464244,0.0002717517,0.001878937],"category_scores_gemma":[0.0025109404,0.000091726804,0.00012652487,0.00047549699,0.00042033076,0.00035251706,0.0002588671,0.00031948002,0.00009309177],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0024284995,0.00026332846,0.7217954,0.00015850196,0.00027811647,0.004377684,0.002570172,0.1555642,0.030546872,0.031952605,0.006257666,0.04380686],"study_design_scores_gemma":[0.00004209978,0.00007372094,0.85745823,0.00000551327,0.000022000395,0.00018045527,0.0008190334,0.1330494,0.001691991,0.0039514266,0.0026687284,0.000037505575],"about_ca_topic_score_codex":0.21184963,"about_ca_topic_score_gemma":0.22148049,"teacher_disagreement_score":0.78815037,"about_ca_system_score_codex":0.0014780978,"about_ca_system_score_gemma":0.00047697985,"threshold_uncertainty_score":0.42123306},"labels":[],"label_agreement":null},{"id":"W2081059316","doi":"10.2298/yjor0202157h","title":"A separable approximation dynamic programming algorithm for economic dispatch with transmission losses","year":2002,"lang":"en","type":"article","venue":"Yugoslav journal of operations research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; HEC Montréal","funders":"","keywords":"Lagrange multiplier; Economic dispatch; Mathematical optimization; Separable space; Convergence (economics); Quadratic equation; Quadratic programming; Dynamic programming; Multiplier (economics); Mathematics; Transmission (telecommunications); Stability (learning theory); Iterative method; Computer science; Algorithm; Electric power system","score_opus":0.02603753094713742,"score_gpt":0.30592939787669976,"score_spread":0.27989186692956236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2081059316","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015691972,0.00007392667,0.9969785,0.00005368814,0.000016394786,0.000017164197,0.000014720387,0.00017849497,0.0010979194],"genre_scores_gemma":[0.117694415,0.00035509394,0.87380695,0.0000653776,0.00005235643,0.00030234896,0.00017576295,0.00025134705,0.0072964085],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995956,0.0001230098,0.000016237376,0.00006821994,0.0001563312,0.000040619027],"domain_scores_gemma":[0.99973756,0.0001285076,0.000028215296,0.000028292035,0.000057168105,0.000020217034],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071920425,0.0010846794,0.001318489,0.00062584307,0.00045858885,0.0010845811,0.0011199504,0.0007549936,0.0041332636],"category_scores_gemma":[0.0014018313,0.0006149782,0.00060558465,0.0012634619,0.00059831486,0.0011557571,0.0011671615,0.0018443168,0.0011408689],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011559685,0.00006662058,0.00013224583,0.000087495726,0.000041532672,0.00006212938,0.000076741206,0.70958054,0.0025012903,0.06694547,0.003736975,0.21665344],"study_design_scores_gemma":[0.000014710957,0.000012099923,0.000021561746,0.0000036990343,0.0000030935933,0.000013704943,0.0000032292055,0.9898127,0.0002805299,0.008112492,0.0017182181,0.00000394413],"about_ca_topic_score_codex":0.0032066677,"about_ca_topic_score_gemma":0.0027852484,"teacher_disagreement_score":0.0041332636,"about_ca_system_score_codex":0.00088832196,"about_ca_system_score_gemma":0.0012037491,"threshold_uncertainty_score":0.0138270855},"labels":[],"label_agreement":null},{"id":"W2081109420","doi":"10.1049/iet-gtd.2012.0729","title":"Stochastic self‐scheduling of generation companies in day‐ahead multi‐auction electricity markets considering uncertainty of units and electricity market prices","year":2013,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Electricity market; Electricity; Electricity retailing; Scheduling (production processes); Electricity generation; Microeconomics; Business; Industrial organization; Computer science; Economics; Electrical engineering; Power (physics); Engineering; Operations management","score_opus":0.015912105210393466,"score_gpt":0.21500652605070594,"score_spread":0.19909442084031248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2081109420","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34598994,0.00023138522,0.64911276,0.00033759236,0.00007303962,0.0000695392,0.00013886656,0.00013920202,0.003907606],"genre_scores_gemma":[0.99312794,0.00005593071,0.0053745713,0.00001883011,0.000014178228,0.000027511229,0.00003972429,0.000015693015,0.0013256416],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921775,0.0003715221,0.000033260225,0.00011608616,0.0001393256,0.000122054575],"domain_scores_gemma":[0.9985103,0.00067074335,0.00040388881,0.000086040425,0.00020758685,0.00012143242],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015480843,0.0006007608,0.0011328063,0.00027145026,0.00034497882,0.0012120814,0.0010898063,0.0008563094,0.0009945016],"category_scores_gemma":[0.002264042,0.0006439378,0.0006859563,0.00039243308,0.0006730045,0.0013014922,0.00058232056,0.0007968799,0.00012501667],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002194025,0.0000108733275,0.00019830735,0.000004095987,0.000010037232,0.000028728327,0.000005311587,0.99694103,0.00014519256,0.0019393464,0.000047289992,0.0006477187],"study_design_scores_gemma":[0.0000028115096,0.0000070738124,0.000044325105,2.909141e-7,0.0000015219292,0.000003518824,0.0000015949803,0.9994498,0.0000342413,0.0004349853,0.00001854795,0.0000012971402],"about_ca_topic_score_codex":0.0068307836,"about_ca_topic_score_gemma":0.0050381254,"teacher_disagreement_score":0.0068307836,"about_ca_system_score_codex":0.00089161814,"about_ca_system_score_gemma":0.0011665334,"threshold_uncertainty_score":0.013582051},"labels":[],"label_agreement":null},{"id":"W2082259714","doi":"10.1109/lescpe.2006.280358","title":"Security Constraints Unit Commitment for a Multi-Regional Electricity Market","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Electricity market; Power system simulation; Electricity; Operator (biology); Deregulation; Computer science; Mathematical optimization; Electric power system; Electricity retailing; Electricity generation; Operations research; Economics; Power (physics); Engineering; Electrical engineering; Mathematics; Market economy","score_opus":0.0180610211760761,"score_gpt":0.2341594364953559,"score_spread":0.21609841531927979,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2082259714","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015053777,0.00027876394,0.9775835,0.00018872996,0.000041154006,0.000046297973,0.000077315875,0.000099137316,0.0066313036],"genre_scores_gemma":[0.75184596,0.00047437972,0.23717862,0.00008763435,0.00006660362,0.00022605882,0.00014652162,0.00017262885,0.009801528],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991523,0.00044037888,0.000023764986,0.00013452244,0.00016835635,0.00008068541],"domain_scores_gemma":[0.9995203,0.00025157665,0.000064744934,0.00005018163,0.00007488352,0.0000384731],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011688583,0.0008110297,0.0009438723,0.00033475665,0.00040748203,0.0011189774,0.0013512258,0.0008827645,0.006291738],"category_scores_gemma":[0.0017333713,0.00045476286,0.0006175228,0.00071103656,0.00058574846,0.001228408,0.00089813484,0.0013642041,0.0007537219],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037443464,0.000016388381,0.00009149382,0.00004541232,0.000027163107,0.000083423496,0.000026283284,0.9522196,0.0011958466,0.03305736,0.0008297682,0.012369868],"study_design_scores_gemma":[0.000009977972,0.000018667173,0.000043686272,0.0000037426712,0.0000056962776,0.00002061996,0.000008670435,0.9928705,0.0003309571,0.005680866,0.0010014421,0.0000051560614],"about_ca_topic_score_codex":0.0026077132,"about_ca_topic_score_gemma":0.0030450386,"teacher_disagreement_score":0.006291738,"about_ca_system_score_codex":0.0008436498,"about_ca_system_score_gemma":0.0009984699,"threshold_uncertainty_score":0.02104801},"labels":[],"label_agreement":null},{"id":"W2082835804","doi":"10.1007/s11149-011-9169-9","title":"Response of industrial customers to hourly pricing in Ontario’s deregulated electricity market","year":2011,"lang":"en","type":"article","venue":"Journal of Regulatory Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Economics; Order (exchange); Consumption (sociology); Public finance; Electricity market; Electricity pricing; Microeconomics; Demand side; Electricity retailing; Demand response; Econometrics; Industrial organization; Macroeconomics; Finance","score_opus":0.018352310139828618,"score_gpt":0.18124040285932216,"score_spread":0.16288809271949356,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2082835804","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9954282,0.000024649356,0.000039785897,0.0006321725,0.0000061587325,0.000010696043,0.00013668468,0.0000056422,0.0037159182],"genre_scores_gemma":[0.998505,0.000020108937,0.000021727152,0.0000538972,0.0000048256984,0.0000017679595,0.00009683509,0.000001851336,0.0012940171],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99942076,0.00013195937,0.000017925357,0.000046570723,0.00017104358,0.00021176021],"domain_scores_gemma":[0.9976331,0.00085219636,0.000358844,0.00006587734,0.0006801977,0.00040987018],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00070696225,0.00010713543,0.00028543928,0.0002355878,0.000944413,0.0016431772,0.000725875,0.0010328551,0.0037752914],"category_scores_gemma":[0.003768685,0.00020321294,0.0002036824,0.0005908039,0.0005874783,0.00055240496,0.00036550584,0.00071748457,0.0003338843],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0055791326,0.0010921046,0.8704391,0.000061215644,0.00014069,0.0025943508,0.0059682075,0.04903596,0.0051685343,0.007331002,0.028607257,0.02398247],"study_design_scores_gemma":[0.00019755057,0.00023365978,0.8859242,0.000013454901,0.000029838195,0.000140423,0.013041019,0.09165007,0.0007602411,0.0011083892,0.006829888,0.00007119502],"about_ca_topic_score_codex":0.77392435,"about_ca_topic_score_gemma":0.8644377,"teacher_disagreement_score":0.22607565,"about_ca_system_score_codex":0.011076186,"about_ca_system_score_gemma":0.0037744504,"threshold_uncertainty_score":0.45481408},"labels":[],"label_agreement":null},{"id":"W2083055477","doi":"10.5547/01956574.36.4.kmal","title":"The Impact of Electricity Sector Restructuring on Coal-fired Power Plants in India","year":2015,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kellogg's (Canada)","funders":"","keywords":"Unbundling; Restructuring; Electricity; Electricity generation; Thermal power station; Business; Nameplate capacity; Coal; Industrial organization; Natural resource economics; Power (physics); Environmental economics; Economics; Waste management; Engineering; Finance; Electrical engineering","score_opus":0.009907321700084296,"score_gpt":0.21874027220152734,"score_spread":0.20883295050144304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2083055477","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9946426,0.0001257371,0.00008836448,0.00044198803,0.0000063537536,0.00000590463,0.00017941355,0.000012403511,0.004497253],"genre_scores_gemma":[0.99946135,0.000071404225,0.000020804024,0.000037040172,0.0000025803163,0.0000013003829,0.0000815486,0.000001077077,0.00032291783],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99942315,0.00011298753,0.000021798063,0.000036227364,0.000089486246,0.00031642293],"domain_scores_gemma":[0.9984438,0.00040983254,0.0006104763,0.000085718726,0.00023999615,0.00021027295],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003384502,0.00013244677,0.00016612145,0.0003883759,0.00037463094,0.0011336862,0.00044588905,0.00032894374,0.0016533573],"category_scores_gemma":[0.0017740729,0.00011047362,0.00037388437,0.00077715935,0.00064778584,0.00055159075,0.0007996289,0.00078220305,0.0001706795],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007993133,0.0005790753,0.87962687,0.0001967318,0.00020650431,0.0039533256,0.0017188609,0.054895792,0.0060890056,0.010675862,0.004490314,0.03676843],"study_design_scores_gemma":[0.00001630375,0.00015482321,0.9878796,0.000019349847,0.00005305599,0.00027397161,0.0029316987,0.0045619328,0.0012998966,0.00058765244,0.0022034477,0.000018252298],"about_ca_topic_score_codex":0.092932925,"about_ca_topic_score_gemma":0.1271186,"teacher_disagreement_score":0.092932925,"about_ca_system_score_codex":0.0026858095,"about_ca_system_score_gemma":0.0017145746,"threshold_uncertainty_score":0.184784},"labels":[],"label_agreement":null},{"id":"W2083593405","doi":"10.1016/j.enpol.2009.10.032","title":"Long-term uncertainty evaluation of pool electricity markets","year":2009,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Term (time); Electricity; Economics; Natural resource economics; Electricity market; Business; Environmental economics; Engineering; Physics","score_opus":0.009904219640855918,"score_gpt":0.2551104251714278,"score_spread":0.24520620553057187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2083593405","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9061128,0.0013577064,0.06982388,0.00411824,0.00013516202,0.000093445495,0.00055345014,0.00013386445,0.017671466],"genre_scores_gemma":[0.9966281,0.00014022108,0.0015632239,0.000051970983,0.000027430722,0.00002036374,0.00009042894,0.000020631958,0.0014574733],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980463,0.0013375911,0.000056895264,0.00014262958,0.00020909421,0.00020755689],"domain_scores_gemma":[0.9888685,0.008950835,0.0005892755,0.00029592594,0.0009591225,0.00033639898],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007701275,0.00092299544,0.001904342,0.0007916635,0.0007920107,0.0029527391,0.0012440456,0.0022113845,0.0026739202],"category_scores_gemma":[0.02406285,0.0007626252,0.00085241476,0.0008561837,0.0014917245,0.0048591397,0.0014224999,0.00213372,0.00012409738],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027488987,0.000045090794,0.0007139675,0.00003362121,0.000048968985,0.00010020989,0.0000270849,0.9785252,0.0002358377,0.017669845,0.00043023456,0.0018950913],"study_design_scores_gemma":[0.00003096036,0.00009227908,0.00043739792,0.000007418117,0.000022179887,0.000008531827,0.00004320948,0.98475677,0.0002876905,0.014129495,0.00016731028,0.000016819362],"about_ca_topic_score_codex":0.01046956,"about_ca_topic_score_gemma":0.006755684,"teacher_disagreement_score":0.01046956,"about_ca_system_score_codex":0.0030468511,"about_ca_system_score_gemma":0.0025812346,"threshold_uncertainty_score":0.040728748},"labels":[],"label_agreement":null},{"id":"W2084187431","doi":"10.1016/j.enpol.2011.01.033","title":"Ontario feed-in-tariff programs","year":2011,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":106,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"Government of Ontario","keywords":"Tariff; Photovoltaic system; Feed-in tariff; Electricity; Legislation; Wind power; Sustainability; Mains electricity; Business; Engineering; Environmental economics; Operations management; Renewable energy; Economics; Political science; Energy policy; Electrical engineering","score_opus":0.013491096838216027,"score_gpt":0.17685306958703353,"score_spread":0.1633619727488175,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2084187431","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.077764615,0.00033700126,0.0054033063,0.008915285,0.00021585457,0.0005977553,0.009733189,0.00037120443,0.89666176],"genre_scores_gemma":[0.3697097,0.00046220157,0.006063928,0.0011668879,0.000052836316,0.00021949339,0.0028382416,0.00014709712,0.61933964],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.99825937,0.00019531717,0.00003084981,0.00007279777,0.00084811985,0.00059357163],"domain_scores_gemma":[0.99834955,0.0001896736,0.000057156558,0.00008625389,0.0010173165,0.00030005243],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009177261,0.00031178005,0.00031641306,0.0011175382,0.0029537827,0.0018075334,0.0009607207,0.00069640647,0.049297817],"category_scores_gemma":[0.0033652785,0.00032222294,0.00048874476,0.0015493894,0.00045978974,0.00045914156,0.0007235038,0.00092068024,0.002165013],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008795555,0.00051800744,0.024506679,0.00031889157,0.000114740986,0.00026988407,0.00086329307,0.019139191,0.0022927702,0.21519315,0.57918566,0.15671816],"study_design_scores_gemma":[0.00034815905,0.0002580961,0.07157351,0.000079606434,0.000096779026,0.000088492896,0.0008289613,0.020773979,0.0029306777,0.009249822,0.8937105,0.000061482126],"about_ca_topic_score_codex":0.9332061,"about_ca_topic_score_gemma":0.98908186,"teacher_disagreement_score":0.06679392,"about_ca_system_score_codex":0.033673782,"about_ca_system_score_gemma":0.06383337,"threshold_uncertainty_score":0.24432153},"labels":[],"label_agreement":null},{"id":"W2085116453","doi":"10.1007/s10287-014-0222-x","title":"The natural hedge of a gas-fired power plant","year":2014,"lang":"en","type":"article","venue":"Computational Management Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Lawrence Berkeley National Laboratory; HEC Montréal","keywords":"Hedge; Natural gas prices; Spot contract; Natural gas; Electricity; Economics; Electricity generation; Stochastic programming; Volatility (finance); Electricity price; Microeconomics; Econometrics; Futures contract; Business; Financial economics; Power (physics); Engineering; Waste management; Mathematics","score_opus":0.0033074452193659967,"score_gpt":0.18609909155247228,"score_spread":0.1827916463331063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2085116453","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97979236,0.000069036854,0.016653098,0.00019347874,0.0000075889893,0.000011358922,0.00010986282,0.000023115015,0.0031400449],"genre_scores_gemma":[0.9985114,0.000016056045,0.0011776383,0.000005605722,0.0000017319771,0.0000018182114,0.0000181349,0.0000012830799,0.00026624172],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998504,0.00006243193,0.0000065170007,0.000033655804,0.000025798898,0.000021144342],"domain_scores_gemma":[0.99936837,0.00038128693,0.00014440586,0.00004127012,0.000021468437,0.000043281],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052213797,0.00017011765,0.00018666897,0.00014321275,0.0001993047,0.00062275643,0.00027520748,0.0005358053,0.0013638982],"category_scores_gemma":[0.0019191387,0.00017058155,0.00029134646,0.0001490521,0.0005627946,0.0008331716,0.0003763366,0.0004638833,0.00004702511],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004439728,0.000106496176,0.025184192,0.00007907907,0.000086896354,0.00080351735,0.00015319252,0.91407,0.007634143,0.03964358,0.00071210443,0.0110828625],"study_design_scores_gemma":[0.0000395204,0.0002757847,0.02276491,0.000014357554,0.000026142252,0.00024991078,0.00014613636,0.9496561,0.0027410435,0.023054568,0.0009944411,0.000036990346],"about_ca_topic_score_codex":0.002469647,"about_ca_topic_score_gemma":0.003316433,"teacher_disagreement_score":0.002469647,"about_ca_system_score_codex":0.00046234328,"about_ca_system_score_gemma":0.0003143118,"threshold_uncertainty_score":0.0049105883},"labels":[],"label_agreement":null},{"id":"W2087603572","doi":"10.1016/s0301-4215(99)00087-7","title":"A perspective on the restructuring of the Finnish electricity market","year":2000,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Restructuring; Deregulation; Electricity market; Electricity; Market economy; Perspective (graphical); Dimension (graph theory); Originality; Electricity retailing; Electric power industry; Business; Economics; Industrial organization; Economic system; Economy; Political science; Engineering; Finance","score_opus":0.003172314034370209,"score_gpt":0.1863178166390369,"score_spread":0.1831455026046667,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2087603572","genre_codex":"other","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057988677,0.029680103,0.009275879,0.111458704,0.0015571719,0.000030477135,0.0002718494,0.00003185407,0.78970534],"genre_scores_gemma":[0.93742025,0.016787201,0.0018301193,0.0068925456,0.0015018953,0.00004947598,0.000115932475,0.000022916362,0.035379637],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9985833,0.00040177171,0.000036648617,0.00013880926,0.00034820684,0.0004912768],"domain_scores_gemma":[0.99938035,0.00031873203,0.00006549696,0.000027457098,0.0001124315,0.00009550295],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012392617,0.0005931638,0.00042172224,0.0013187967,0.003077635,0.0075651095,0.0010388319,0.0068935505,0.007624914],"category_scores_gemma":[0.0029881173,0.00024335836,0.00069893576,0.0015226376,0.0039854203,0.0043884492,0.001472695,0.0033080978,0.00038199316],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004867651,0.000021003258,0.00023594305,0.00005777563,0.000009500011,0.00036611737,0.00041267747,0.006271874,0.00024069207,0.9803208,0.0049642813,0.007050636],"study_design_scores_gemma":[0.000040535393,0.00005911126,0.004088945,0.00036300105,0.00003567744,0.00031243116,0.0028206068,0.007670726,0.00050317263,0.7970245,0.1870293,0.000052038944],"about_ca_topic_score_codex":0.036686003,"about_ca_topic_score_gemma":0.041727543,"teacher_disagreement_score":0.036686003,"about_ca_system_score_codex":0.009593169,"about_ca_system_score_gemma":0.008050312,"threshold_uncertainty_score":0.07294494},"labels":[],"label_agreement":null},{"id":"W2087767050","doi":"10.1109/ptc.2009.5282254","title":"A framework for the simultaneous clearing of multiple markets within a common transmission system","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Clearing; Nash equilibrium; Interconnection; Market clearing; Computer science; Mathematical optimization; Transmission (telecommunications); Pareto optimal; Pareto principle; Set (abstract data type); Transmission line; Economics; Telecommunications; Mathematics; Microeconomics","score_opus":0.008048158282935378,"score_gpt":0.21967268361386022,"score_spread":0.21162452533092485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2087767050","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025646854,0.00013420239,0.9938233,0.00013489967,0.000025626561,0.000052781746,0.000021127491,0.00005086113,0.0031926034],"genre_scores_gemma":[0.27541277,0.0005374717,0.71532285,0.000104601546,0.00015534049,0.00051108137,0.00009851243,0.000082157596,0.0077752066],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99790937,0.0009793739,0.00007029382,0.00030772845,0.0005002109,0.00023301248],"domain_scores_gemma":[0.9987136,0.00073351146,0.000119024146,0.00018131958,0.00014699076,0.00010543145],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036104165,0.0010531392,0.0015980493,0.00074139674,0.0015817801,0.002994984,0.0039055229,0.002248812,0.008368052],"category_scores_gemma":[0.005022308,0.0009135629,0.0015326003,0.0012310505,0.0032626311,0.00420639,0.0025854586,0.0025285785,0.00090851786],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000343283,0.000044046137,0.00009271886,0.000077078694,0.000030180569,0.00017444923,0.00012348215,0.3580926,0.0009735864,0.6256877,0.000973754,0.0136958985],"study_design_scores_gemma":[0.000060355793,0.00006201508,0.00004218612,0.000015226478,0.000012039692,0.00009979566,0.00004036495,0.79778165,0.0002573792,0.19635431,0.005257072,0.00001759052],"about_ca_topic_score_codex":0.0036217663,"about_ca_topic_score_gemma":0.0045328275,"teacher_disagreement_score":0.008368052,"about_ca_system_score_codex":0.0015668299,"about_ca_system_score_gemma":0.0026416464,"threshold_uncertainty_score":0.027993917},"labels":[],"label_agreement":null},{"id":"W2087848664","doi":"10.1109/tpwrs.2011.2180935","title":"Time-of-Use Pricing in Electricity Markets Under Different Market Structures","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":165,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity market; Electricity pricing; Electricity; Economics; Context (archaeology); Microeconomics; Variable pricing; Welfare; Scheme (mathematics); Market power; Econometrics; Industrial organization; Monopoly; Engineering; Market economy; Mathematics","score_opus":0.00840577856234772,"score_gpt":0.20087651612512983,"score_spread":0.1924707375627821,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2087848664","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07588564,0.0008952605,0.90209424,0.0021727504,0.00018631865,0.00009949947,0.00023426897,0.000069629496,0.018362446],"genre_scores_gemma":[0.9543696,0.00076909736,0.030883953,0.00024058169,0.00015188627,0.00017616898,0.00014533353,0.000048448874,0.0132149],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998495,0.00081087486,0.000033554137,0.00020596352,0.00020846093,0.00024619547],"domain_scores_gemma":[0.9976803,0.0015919986,0.00028627785,0.00007986062,0.00020815778,0.00015345623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026554111,0.0009490566,0.0013534797,0.00053930667,0.0005750158,0.0021936242,0.0027760419,0.0025739805,0.0032759693],"category_scores_gemma":[0.0070031886,0.0006090016,0.0013927819,0.000706452,0.0019432682,0.0036266996,0.0013854206,0.0022620417,0.00025560815],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034902227,0.000058078396,0.0005241667,0.00003306904,0.000034878867,0.000115128656,0.0000694346,0.69290483,0.00036717596,0.30095154,0.0007638926,0.0041428516],"study_design_scores_gemma":[0.000008254275,0.000011642181,0.000096746764,0.0000037112718,0.000004774174,0.000009986825,0.000013785721,0.969289,0.00003569281,0.03019945,0.00032028637,0.000006684107],"about_ca_topic_score_codex":0.010197757,"about_ca_topic_score_gemma":0.008492825,"teacher_disagreement_score":0.010197757,"about_ca_system_score_codex":0.0023124162,"about_ca_system_score_gemma":0.0015990501,"threshold_uncertainty_score":0.020276785},"labels":[],"label_agreement":null},{"id":"W2089254196","doi":"10.1016/j.enpol.2004.12.019","title":"Electricity markets volatility: estimates, regularities and risk management applications","year":2005,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Electricity; Volatility (finance); Futures contract; Electricity market; Deregulation; Electric power; Electric power industry; Economics; Business; Industrial organization; Risk management; Financial economics; Finance; Power (physics); Market economy; Engineering","score_opus":0.0026598840609641755,"score_gpt":0.1905034763286211,"score_spread":0.18784359226765693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2089254196","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5039008,0.0045348713,0.48187456,0.001931602,0.00016436209,0.00006626929,0.0010219992,0.00073090196,0.005774711],"genre_scores_gemma":[0.9814736,0.0011219435,0.016019618,0.00003393988,0.00020144001,0.000019692881,0.00044750574,0.00006537013,0.0006168042],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989619,0.00048787688,0.00008544816,0.00017265615,0.00025020327,0.000041864794],"domain_scores_gemma":[0.98585457,0.010003533,0.0017064807,0.0014180492,0.0008794746,0.00013794898],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0049888575,0.00066725217,0.0008179176,0.0017908429,0.00021309551,0.0017721395,0.00068282586,0.0006825556,0.0007639676],"category_scores_gemma":[0.029433765,0.00046327876,0.0006423273,0.0017468361,0.00046509466,0.0023485827,0.0007066163,0.0012535792,0.00013588983],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005159215,0.00019213703,0.12092015,0.00021518326,0.0008493535,0.00024080084,0.00026164012,0.5444696,0.0030408164,0.090928614,0.0053540985,0.2330118],"study_design_scores_gemma":[0.000019922229,0.00008691968,0.023557698,0.00003774353,0.00008488304,0.00018840154,0.00006767801,0.93043536,0.00206912,0.042182997,0.001220938,0.00004828019],"about_ca_topic_score_codex":0.0015254689,"about_ca_topic_score_gemma":0.0010893974,"teacher_disagreement_score":0.0049888575,"about_ca_system_score_codex":0.0004005893,"about_ca_system_score_gemma":0.00027718823,"threshold_uncertainty_score":0.026383936},"labels":[],"label_agreement":null},{"id":"W2091989020","doi":"10.1016/s0378-7796(02)00217-1","title":"Algorithms for incorporating reactive power into market dispatch","year":2003,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"AC power; Economic dispatch; Mathematical optimization; Convexity; Power flow; Computer science; Power (physics); Electricity market; Electric power system; Electricity; Engineering; Economics; Mathematics; Electrical engineering; Finance","score_opus":0.025406296818354844,"score_gpt":0.3034344911996591,"score_spread":0.27802819438130427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2091989020","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0039073047,0.000091510585,0.99305314,0.0001321737,0.00009641342,0.0000438834,0.0000529407,0.000566413,0.0020562029],"genre_scores_gemma":[0.19374001,0.00021567268,0.80012965,0.00022039715,0.00025963187,0.00033783627,0.0002801278,0.00047282956,0.0043437886],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99904424,0.000435828,0.000060443752,0.00014980987,0.0002212552,0.00008829238],"domain_scores_gemma":[0.99539524,0.0033540404,0.00026235098,0.00032809263,0.0005308366,0.00012930478],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040058563,0.0016802978,0.0017069425,0.0014115215,0.001020582,0.0020601812,0.0025669106,0.0020727857,0.0071106683],"category_scores_gemma":[0.010908484,0.0014847937,0.00097467186,0.0017166442,0.001038136,0.0047429977,0.001635201,0.0023710704,0.0013042773],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012500782,0.00009250382,0.00019031754,0.000046163088,0.00003980771,0.000023751123,0.000042499374,0.8808454,0.00038512945,0.030193884,0.0032457903,0.08476985],"study_design_scores_gemma":[0.000027744194,0.000008623996,0.000013695996,0.0000032394717,0.0000046796677,0.000002954361,0.0000025375837,0.9903964,0.00012294078,0.0090770135,0.00033737853,0.0000027846418],"about_ca_topic_score_codex":0.004352074,"about_ca_topic_score_gemma":0.0057324665,"teacher_disagreement_score":0.0071106683,"about_ca_system_score_codex":0.0014077043,"about_ca_system_score_gemma":0.0014677234,"threshold_uncertainty_score":0.023787498},"labels":[],"label_agreement":null},{"id":"W2093744828","doi":"10.1109/eem.2010.5558726","title":"Setting greenhouse gas emission target for a generation mix expansion model","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"","keywords":"Greenhouse gas; Lagrange multiplier; Time horizon; Upper and lower bounds; Electricity generation; Zero emission; Constraint (computer-aided design); Zero lower bound; Electricity; Wind power; Mathematical optimization; Economics; Environmental science; Power (physics); Mathematics; Engineering; Physics; Electrical engineering; Monetary economics","score_opus":0.009792508469644527,"score_gpt":0.21565644546955956,"score_spread":0.20586393699991504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2093744828","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11759719,0.00018114338,0.8609586,0.00037974585,0.000014052333,0.00019896473,0.00024445343,0.00022448275,0.020201359],"genre_scores_gemma":[0.93105036,0.00017558491,0.06205428,0.00004268744,0.000012424768,0.0003479331,0.000103027494,0.00005169912,0.0061620376],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997003,0.00015140248,0.000006212333,0.000038899023,0.000065000066,0.000038313377],"domain_scores_gemma":[0.9997155,0.00016943552,0.000044350847,0.000010065742,0.00004246339,0.000018267003],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009805089,0.00073665805,0.0006573597,0.00043564264,0.00037968883,0.0008753568,0.001012986,0.00080826227,0.0028006048],"category_scores_gemma":[0.0012416496,0.00051963935,0.0004944208,0.00040850491,0.00054916635,0.0008273764,0.0008100511,0.0008185585,0.00023608177],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000102846325,0.000005901159,0.00010672721,0.000009782697,0.000005018619,0.00001857092,0.000014744409,0.9945083,0.0002948432,0.0039940802,0.000058280853,0.00097349676],"study_design_scores_gemma":[0.0000070365945,0.00001188908,0.00004881799,0.0000026124444,0.000004208628,0.000003932365,0.000008633075,0.9974954,0.00011748132,0.0020866676,0.00021023476,0.0000030416502],"about_ca_topic_score_codex":0.012883307,"about_ca_topic_score_gemma":0.013897504,"teacher_disagreement_score":0.012883307,"about_ca_system_score_codex":0.0015373849,"about_ca_system_score_gemma":0.0018611902,"threshold_uncertainty_score":0.025616646},"labels":[],"label_agreement":null},{"id":"W2094423654","doi":"10.1016/j.eneco.2010.08.004","title":"Investment in electricity markets with asymmetric technologies","year":2010,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Electricity; Investment (military); Economics; Natural resource economics; Industrial organization; Electricity market; Microeconomics; Business; Environmental economics; Engineering","score_opus":0.0022163837019978983,"score_gpt":0.1444585539531764,"score_spread":0.1422421702511785,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2094423654","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8013516,0.0019866086,0.098401725,0.010224751,0.00018874921,0.000083025145,0.00027797782,0.00010998886,0.08737557],"genre_scores_gemma":[0.9893835,0.00050316675,0.0014478582,0.00008882088,0.00009887541,0.00001712875,0.000046602705,0.000012238377,0.00840181],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928135,0.00036467196,0.00002292425,0.000064263346,0.0001260567,0.00014088965],"domain_scores_gemma":[0.9966337,0.0022900153,0.0004802214,0.00012805281,0.00019497734,0.00027305452],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019923153,0.00045808207,0.0010738688,0.00056383625,0.00060263893,0.002802342,0.00093467,0.0024736018,0.0073379236],"category_scores_gemma":[0.008850337,0.0005944292,0.00047189783,0.0007571125,0.0015550338,0.006372948,0.0009217076,0.0017559896,0.00028976],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031272735,0.00013471508,0.0031432237,0.00009827368,0.000048046553,0.00057829556,0.00006497785,0.2027521,0.0006477804,0.777317,0.0030372788,0.011865588],"study_design_scores_gemma":[0.00013083886,0.00006329476,0.0012027972,0.000022100525,0.000032201435,0.00013826061,0.00011701496,0.2852508,0.00033331438,0.7109701,0.0017186452,0.000020641291],"about_ca_topic_score_codex":0.001562446,"about_ca_topic_score_gemma":0.0023729592,"teacher_disagreement_score":0.0073379236,"about_ca_system_score_codex":0.0017958609,"about_ca_system_score_gemma":0.0011305673,"threshold_uncertainty_score":0.024547815},"labels":[],"label_agreement":null},{"id":"W2096598624","doi":"10.1109/ccece.1995.528103","title":"Economic implications to electric power utilities of wind energy produced by nonutility generation","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Computer science; Operating cost; Energy (signal processing); Electric energy; Electric utility; Electricity generation; Reliability engineering; Operations research; Mathematical optimization; Power (physics); Environmental economics; Engineering; Economics; Electrical engineering; Mathematics","score_opus":0.01037573775773561,"score_gpt":0.18738770911138172,"score_spread":0.1770119713536461,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096598624","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.277601,0.014291925,0.34260383,0.018353652,0.0012537375,0.0003319887,0.00045760837,0.00007855246,0.34502771],"genre_scores_gemma":[0.9679557,0.004566485,0.015161218,0.00029998834,0.00028636365,0.000087653476,0.000053969765,0.000033489443,0.011555108],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9991134,0.00048251104,0.000022863222,0.000039584997,0.00027135928,0.00007038333],"domain_scores_gemma":[0.99668294,0.0026019174,0.00026016208,0.00007001192,0.00031919405,0.00006571105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016496299,0.00071040494,0.00035561252,0.0007209143,0.0010147252,0.0025336226,0.0006994371,0.00095299084,0.0043273787],"category_scores_gemma":[0.007207969,0.00036204018,0.0003896889,0.0011103299,0.0015966523,0.0026102369,0.0010260674,0.0020110225,0.0001935194],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023152289,0.00009069697,0.003165785,0.000159051,0.000029088162,0.0008969219,0.00010858548,0.18487898,0.0010233908,0.7398535,0.0028978328,0.06666467],"study_design_scores_gemma":[0.00006025817,0.00023339644,0.0047154413,0.00028181847,0.00007804117,0.00056874816,0.0008521144,0.21104963,0.0023182696,0.74432915,0.03543835,0.00007489059],"about_ca_topic_score_codex":0.0025208173,"about_ca_topic_score_gemma":0.0058254446,"teacher_disagreement_score":0.0043273787,"about_ca_system_score_codex":0.0018825784,"about_ca_system_score_gemma":0.0012845179,"threshold_uncertainty_score":0.014476538},"labels":[],"label_agreement":null},{"id":"W2097192841","doi":"10.1109/tpwrs.2003.818689","title":"Transmission network cost allocation based on equivalent bilateral exchanges","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":175,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Fraction (chemistry); Transmission (telecommunications); Generator (circuit theory); Computer science; Transmission network; Independence (probability theory); Mathematical optimization; Power flow; Economic dispatch; Power (physics); Electric power system; Telecommunications; Mathematics; Statistics","score_opus":0.013044449559547238,"score_gpt":0.213739998805969,"score_spread":0.20069554924642177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097192841","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00705327,0.00006676812,0.9845554,0.000079106256,0.000025771838,0.00005132175,0.000016088094,0.000058197995,0.008094128],"genre_scores_gemma":[0.6620744,0.00037059764,0.32490185,0.000102238235,0.00010230182,0.00037007866,0.00006983967,0.00015141538,0.011857373],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99843997,0.0006904079,0.000053165073,0.00014487312,0.0005614577,0.000110155655],"domain_scores_gemma":[0.99940515,0.00027851967,0.000067356144,0.00007786462,0.00013930094,0.00003192785],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014583943,0.00079461234,0.0007344724,0.0009289038,0.00061299204,0.0011527878,0.001676406,0.00062682177,0.005554082],"category_scores_gemma":[0.0032356323,0.00024695747,0.00043617658,0.0008767266,0.00074129814,0.0025599843,0.0011656015,0.0006934564,0.00034345072],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000089596266,0.00006896767,0.00018267217,0.00006541776,0.000026324553,0.00006395113,0.000088985704,0.5698161,0.001839786,0.3050335,0.0018522238,0.12087249],"study_design_scores_gemma":[0.000036722486,0.00005575521,0.0001434302,0.000012122894,0.000017260829,0.00006385134,0.00002322397,0.9031015,0.0010694261,0.09001913,0.005440794,0.000016690836],"about_ca_topic_score_codex":0.0012495297,"about_ca_topic_score_gemma":0.0016530402,"teacher_disagreement_score":0.005554082,"about_ca_system_score_codex":0.001352883,"about_ca_system_score_gemma":0.0008683693,"threshold_uncertainty_score":0.018580258},"labels":[],"label_agreement":null},{"id":"W2097712071","doi":"10.1109/pes.2007.385757","title":"Formulation of Oligopolistic Competition in AC Power Networks: An NLP Approach","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Oligopoly; Node (physics); Competition (biology); Computer science; Set (abstract data type); Operator (biology); Market power; Mathematical optimization; Electric power system; Power (physics); Transmission (telecommunications); Power flow; Nonlinear system; AC power; Artificial intelligence; Operations research; Voltage; Mathematical economics; Engineering; Economics; Microeconomics; Cournot competition; Mathematics; Telecommunications; Electrical engineering","score_opus":0.006337617919972499,"score_gpt":0.20996979855671363,"score_spread":0.20363218063674113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097712071","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011575492,0.0004949469,0.9633191,0.0010147974,0.000091150774,0.000094599745,0.0002836909,0.0000754977,0.023050707],"genre_scores_gemma":[0.7177656,0.0015136455,0.25290823,0.0005697278,0.00041076168,0.0008645433,0.00039384633,0.0001747386,0.025398865],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99933124,0.00036418583,0.000020398476,0.00008381228,0.00014258988,0.000057799567],"domain_scores_gemma":[0.9982514,0.0013090891,0.00015238274,0.00004844004,0.00017860292,0.00006004597],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014560242,0.0010500591,0.0012080082,0.0006225496,0.0005731357,0.0017480046,0.0014254047,0.0016983012,0.0057288343],"category_scores_gemma":[0.0029908987,0.00071106735,0.00064828055,0.0012026695,0.0011118678,0.0015068608,0.0010845012,0.00142971,0.0004010159],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000076071547,0.000017357723,0.000099428515,0.000047080113,0.000008778725,0.0000786479,0.000021566157,0.95257694,0.00011297832,0.043783523,0.0006047502,0.0026413281],"study_design_scores_gemma":[0.000005986954,0.0000071102804,0.000025985566,0.0000058379346,0.0000021216902,0.000009778315,0.000014800015,0.981884,0.000028080409,0.017352095,0.00066144334,0.0000027395088],"about_ca_topic_score_codex":0.009840271,"about_ca_topic_score_gemma":0.008409494,"teacher_disagreement_score":0.009840271,"about_ca_system_score_codex":0.0015952284,"about_ca_system_score_gemma":0.0018189923,"threshold_uncertainty_score":0.019566},"labels":[],"label_agreement":null},{"id":"W2098397733","doi":"10.1109/tpwrs.2005.846203","title":"Deregulated Power Prices: Changes Over Time","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"University of Alberta","keywords":"Volatility (finance); Economics; Deregulation; Excursion; Price level; Mid price; Monetary economics; Econometrics; Financial economics; Macroeconomics","score_opus":0.005151329615617712,"score_gpt":0.1879213485478605,"score_spread":0.1827700189322428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2098397733","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9960239,0.00011539552,0.00055242877,0.00011465277,0.000012664905,0.000010658045,0.0009589205,0.00001769099,0.0021936349],"genre_scores_gemma":[0.9977714,0.00008725743,0.00035798567,0.00002749605,0.000018625991,0.000008318246,0.0010655964,0.000008041525,0.0006552748],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99947685,0.000057102257,0.00005723387,0.00011559862,0.00018236894,0.00011083664],"domain_scores_gemma":[0.9961463,0.00078181585,0.0018239365,0.00020482305,0.0008061857,0.00023695511],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073350995,0.00016827544,0.00038054748,0.0011249129,0.0003113716,0.0017878066,0.00050691125,0.00043353022,0.0030570305],"category_scores_gemma":[0.00417344,0.00018812576,0.00036360344,0.0021306989,0.00032633962,0.0015508462,0.00059448526,0.00068815175,0.00055038417],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065612316,0.00023191876,0.95552355,0.00005966775,0.0002501554,0.00037405078,0.0012146906,0.004968417,0.0027946238,0.0022423556,0.0016130772,0.030071456],"study_design_scores_gemma":[0.000008324785,0.00015646688,0.98982924,0.0000059667404,0.000027861666,0.00016736955,0.00066099805,0.006462109,0.00047899643,0.0005246422,0.0016560693,0.000021851005],"about_ca_topic_score_codex":0.007843656,"about_ca_topic_score_gemma":0.010984015,"teacher_disagreement_score":0.007843656,"about_ca_system_score_codex":0.0005761036,"about_ca_system_score_gemma":0.00017737858,"threshold_uncertainty_score":0.015595973},"labels":[],"label_agreement":null},{"id":"W2098566315","doi":"10.1109/ccece.2005.1557426","title":"An artificial neural network based transmission loss allocation for bilateral contracts","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Computer science; Artificial neural network; Convergence (economics); Deregulation; Electricity market; Volatility (finance); Electricity; Transmission (telecommunications); Process (computing); Telecommunications; Artificial intelligence; Economics; Econometrics; Engineering","score_opus":0.006653960353564527,"score_gpt":0.2082418685856077,"score_spread":0.20158790823204317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2098566315","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.067973316,0.00037997766,0.9201734,0.00030159322,0.000075074495,0.0000985142,0.00006142924,0.00050130795,0.01043538],"genre_scores_gemma":[0.8618354,0.00023352516,0.12684494,0.000088225286,0.000037566722,0.00021596065,0.000092440794,0.00004870823,0.010603202],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996668,0.0001251687,0.00001600985,0.000050942897,0.000106512336,0.000034585926],"domain_scores_gemma":[0.99968123,0.00014814864,0.000034805435,0.000017442571,0.000105536325,0.000012767173],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010073646,0.0004291471,0.0004347233,0.0005421873,0.00035794426,0.0007955195,0.00078667316,0.00085062324,0.003078756],"category_scores_gemma":[0.001530353,0.0002692737,0.00029459374,0.0006485228,0.00033268196,0.0009543639,0.00048554048,0.0006220491,0.00029123315],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008179092,0.000039905684,0.00026116968,0.00003147546,0.000013907261,0.000027565278,0.00001944217,0.94338876,0.0012277323,0.0020761895,0.0005816262,0.05225052],"study_design_scores_gemma":[0.0000045850206,0.000009915892,0.00005082457,0.0000017717655,0.0000019314386,0.0000030979895,0.0000018085534,0.99927753,0.00023694763,0.00028750396,0.0001222492,0.0000018386481],"about_ca_topic_score_codex":0.0063645807,"about_ca_topic_score_gemma":0.0054292786,"teacher_disagreement_score":0.0063645807,"about_ca_system_score_codex":0.00091991434,"about_ca_system_score_gemma":0.00071758,"threshold_uncertainty_score":0.012655079},"labels":[],"label_agreement":null},{"id":"W2098970646","doi":"10.3386/w17086","title":"Intermittency and the Value of Renewable Energy","year":2011,"lang":"en","type":"report","venue":"National Bureau of Economic Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":179,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"Arizona Research Institute for Solar Energy","keywords":"Intermittency; Renewable energy; Value (mathematics); Economics; Environmental science; Physics; Mathematics; Statistics; Meteorology; Engineering; Electrical engineering","score_opus":0.15097251989058552,"score_gpt":0.4041374440730765,"score_spread":0.253164924182491,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2098970646","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8594356,0.0054630814,0.043060508,0.0046437588,0.00014926697,0.000031083055,0.0012484617,0.00007068039,0.085897535],"genre_scores_gemma":[0.9965653,0.000698004,0.00093089923,0.00004950765,0.000024233674,0.000007312065,0.00014754228,0.000010967752,0.0015662307],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997696,0.000067137415,0.00000948127,0.00003129289,0.00008123,0.000041182404],"domain_scores_gemma":[0.9987538,0.0008496488,0.00016863766,0.00007506961,0.00010854506,0.000044289085],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005164214,0.00021211298,0.00021430908,0.00057308597,0.0002287179,0.0013440754,0.00034254382,0.00042120353,0.0031305235],"category_scores_gemma":[0.0044429875,0.00016664166,0.00032160178,0.0009459786,0.0005855369,0.0016686177,0.0005301077,0.0006620074,0.00012150295],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006562073,0.00007273847,0.039930105,0.000099291115,0.00012125106,0.00043218498,0.00012226499,0.528399,0.00105696,0.38658744,0.0041599325,0.038953204],"study_design_scores_gemma":[0.000019851066,0.00006310431,0.04009628,0.00011006121,0.000050132872,0.00023846884,0.00035611985,0.38801262,0.0007538259,0.5553027,0.01494611,0.00005087983],"about_ca_topic_score_codex":0.0049948306,"about_ca_topic_score_gemma":0.005548412,"teacher_disagreement_score":0.0049948306,"about_ca_system_score_codex":0.0011721915,"about_ca_system_score_gemma":0.00048613257,"threshold_uncertainty_score":0.010472655},"labels":[],"label_agreement":null},{"id":"W2099012137","doi":"10.1109/tpwrs.2004.835650","title":"Pay-as-Bid versus Marginal Pricing–Part II: Market Behavior Under Strategic Generator Offers","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":51,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Payment; Marginal cost; Generator (circuit theory); Economics; Microeconomics; Electricity market; Marginal utility; Yield (engineering); Electricity; Econometrics; Power (physics); Finance; Engineering","score_opus":0.017262599924604362,"score_gpt":0.22379331815591813,"score_spread":0.20653071823131378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099012137","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8623019,0.00014870761,0.12205817,0.0006171229,0.000020619374,0.00012984988,0.000112087786,0.00011473952,0.014496757],"genre_scores_gemma":[0.9955545,0.000024771525,0.0037930028,0.00003062281,0.0000043466853,0.00003141078,0.000017661572,0.000010489944,0.0005331241],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99731797,0.0017198048,0.000067248366,0.00023379854,0.00038659736,0.0002744784],"domain_scores_gemma":[0.9890693,0.007812765,0.0012847905,0.00092489953,0.00058933673,0.0003189239],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0054344716,0.00034610988,0.0007785462,0.00030320574,0.0003533879,0.0017896122,0.0009637512,0.0009687431,0.0035241453],"category_scores_gemma":[0.02372931,0.00031644054,0.0005959291,0.00033010205,0.0014074248,0.002918982,0.00077764085,0.0010104487,0.00023222185],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014477072,0.0003581796,0.017552866,0.0002426976,0.00020697407,0.00052367663,0.00073519896,0.57449925,0.015329887,0.35833195,0.001820713,0.028950907],"study_design_scores_gemma":[0.00012352255,0.0004878551,0.007955177,0.00001733025,0.000036543228,0.00026082827,0.00040118158,0.88334703,0.0033745768,0.10321014,0.00073120755,0.00005472912],"about_ca_topic_score_codex":0.0010079766,"about_ca_topic_score_gemma":0.0008299944,"teacher_disagreement_score":0.0054344716,"about_ca_system_score_codex":0.0011218409,"about_ca_system_score_gemma":0.0008732903,"threshold_uncertainty_score":0.028740585},"labels":[],"label_agreement":null},{"id":"W2099961809","doi":"","title":"Manitoba Hydro wind power reserve requirements","year":2009,"lang":"en","type":"article","venue":"2009 CIGRE/IEEE PES Joint Symposium Integration of Wide-Scale Renewable Resources Into the Power Delivery System","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Manitoba Hydro","funders":"","keywords":"Wind power; Hydro power; Environmental science; Natural resource economics; Engineering; Economics; Environmental engineering; Electrical engineering","score_opus":0.010243348306039523,"score_gpt":0.20426251931476724,"score_spread":0.19401917100872773,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099961809","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18097407,0.0013973146,0.014360232,0.0036253815,0.0004897599,0.000651254,0.021448506,0.0016667023,0.7753867],"genre_scores_gemma":[0.63005316,0.0014649703,0.012831126,0.0014163646,0.00013085429,0.000680334,0.014834413,0.00044046855,0.33814833],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997892,0.00001796812,0.000010380917,0.000024692034,0.00010518657,0.000052521333],"domain_scores_gemma":[0.99921894,0.00007129662,0.00004380201,0.000050745944,0.0005312079,0.000083859704],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031743644,0.000431446,0.00026927085,0.0004762371,0.0013502146,0.0009562821,0.00064065243,0.00037509284,0.056238323],"category_scores_gemma":[0.0009709187,0.000273742,0.00017956975,0.0006042597,0.0002089612,0.00043510244,0.00044764578,0.00043809795,0.008373268],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013329728,0.00032179683,0.03946871,0.001976033,0.000094690775,0.0057585225,0.0023474533,0.054223426,0.09584744,0.071551785,0.44594556,0.28113165],"study_design_scores_gemma":[0.00011583333,0.00016537117,0.055430256,0.00017700753,0.000026871445,0.0010888334,0.00085407216,0.010618113,0.008417168,0.003343568,0.9196932,0.00006974897],"about_ca_topic_score_codex":0.27509522,"about_ca_topic_score_gemma":0.49913412,"teacher_disagreement_score":0.7249048,"about_ca_system_score_codex":0.0022533648,"about_ca_system_score_gemma":0.0062652933,"threshold_uncertainty_score":0.546988},"labels":[],"label_agreement":null},{"id":"W2099975670","doi":"10.1109/tpwrs.2009.2037153","title":"Fast Computation of Pure Strategy Nash Equilibria in Electricity Markets Cleared by Merit Order","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Clearance; Nash equilibrium; Oligopoly; Electricity market; Mathematical optimization; Constant (computer programming); Block (permutation group theory); Computation; Market power; Order (exchange); Integer programming; Electricity; Linear programming; Computer science; Mathematical economics; Economics; Mathematics; Microeconomics; Engineering; Algorithm; Monopoly; Electrical engineering; Combinatorics","score_opus":0.005021927800946435,"score_gpt":0.20625697614811264,"score_spread":0.2012350483471662,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099975670","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3463858,0.00022118376,0.64025,0.00041917976,0.000046346144,0.00013696034,0.00019769385,0.000650484,0.011692409],"genre_scores_gemma":[0.88158077,0.00009011433,0.11579492,0.00004791873,0.000014553231,0.00009529486,0.00019929917,0.00008124003,0.0020959494],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995877,0.0001510981,0.000017426342,0.000047923153,0.00010416025,0.00009169468],"domain_scores_gemma":[0.99593496,0.003166099,0.0003034316,0.00015398882,0.00026942606,0.00017202106],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001326841,0.0008189603,0.0011125682,0.0006959152,0.0006547428,0.0015429828,0.00092021807,0.0009695542,0.0032483558],"category_scores_gemma":[0.008755459,0.00063152955,0.00048300304,0.00058728294,0.001083837,0.001955587,0.0011856677,0.0009939328,0.00033901384],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021706794,0.000050509218,0.0009939426,0.000047818157,0.00002248827,0.00012357876,0.000070060865,0.9509524,0.000717735,0.035956208,0.00045975024,0.010388489],"study_design_scores_gemma":[0.0000119156475,0.000010894546,0.00004439266,0.0000019403808,0.0000012610224,0.000004081872,0.000009502157,0.98832124,0.00013539339,0.011392366,0.00006508252,0.0000020032128],"about_ca_topic_score_codex":0.0059715407,"about_ca_topic_score_gemma":0.008274016,"teacher_disagreement_score":0.0059715407,"about_ca_system_score_codex":0.0011273018,"about_ca_system_score_gemma":0.0014882138,"threshold_uncertainty_score":0.011873603},"labels":[],"label_agreement":null},{"id":"W2100018616","doi":"10.4236/ajor.2011.14031","title":"Optimal Generator Portfolio in Day-Ahead Market under Uncertain Carbon Tax Policy","year":2011,"lang":"en","type":"article","venue":"American Journal of Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Portfolio; Carbon tax; Bidding; Robustness (evolution); Flexibility (engineering); Electricity market; Economics; Generator (circuit theory); Computer science; Electricity; Microeconomics; Finance; Power (physics); Greenhouse gas; Engineering","score_opus":0.040948568793657304,"score_gpt":0.32574030808831855,"score_spread":0.28479173929466123,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2100018616","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6358452,0.000453375,0.34535947,0.001154654,0.000045340934,0.00008464567,0.00043916385,0.0001693037,0.016448826],"genre_scores_gemma":[0.98894054,0.00012865067,0.0070592314,0.000031017116,0.000008514031,0.000027948505,0.00007611129,0.000021914282,0.003706101],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996743,0.00015287787,0.000010150541,0.000050545823,0.000044620912,0.000067516696],"domain_scores_gemma":[0.99934274,0.00036352346,0.00011151927,0.000027391101,0.00006648028,0.00008831101],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010053297,0.0005575085,0.0010642279,0.0003322357,0.00034386764,0.0015702747,0.0006863971,0.0013579521,0.0026406755],"category_scores_gemma":[0.0022561937,0.00051997876,0.0003561129,0.0003905549,0.00069341704,0.0015126474,0.0005428246,0.000802519,0.00022546921],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041580468,0.000014105037,0.00026602705,0.000010690283,0.00000840267,0.00006743321,0.000010594644,0.98744255,0.0004004181,0.01030585,0.0002479231,0.0011844846],"study_design_scores_gemma":[0.0000061567503,0.000008096794,0.000079913094,0.0000012374302,0.0000023122936,0.000005652009,0.0000056385124,0.996846,0.000057526482,0.0029337471,0.00005079121,0.000002750587],"about_ca_topic_score_codex":0.003916695,"about_ca_topic_score_gemma":0.0029648184,"teacher_disagreement_score":0.003916695,"about_ca_system_score_codex":0.0012149301,"about_ca_system_score_gemma":0.0009615633,"threshold_uncertainty_score":0.008833885},"labels":[],"label_agreement":null},{"id":"W2100381764","doi":"10.1109/pes.2011.6038938","title":"Including a combined fuzzy and probabilistic load model in transmission energy loss evaluation: Experience at BC Hydro","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Probabilistic logic; Fuzzy logic; Computer science; Energy (signal processing); Transmission (telecommunications); Probability distribution; Probabilistic forecasting; Reliability engineering; Electric power system; Power (physics); Power transmission; Load profile; Load distribution; Electric power transmission; Mathematical optimization; Engineering; Statistics; Mathematics; Electricity; Telecommunications; Electrical engineering; Artificial intelligence","score_opus":0.03711856466967493,"score_gpt":0.24108555343257662,"score_spread":0.2039669887629017,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2100381764","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90966505,0.0001793697,0.080201484,0.0004571457,0.000016000562,0.00009114859,0.00008444108,0.0001559454,0.009149469],"genre_scores_gemma":[0.9797792,0.00014097318,0.018863717,0.000018160317,0.000008630228,0.000019650843,0.0000381794,0.000028509496,0.001102959],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988726,0.00064027007,0.000036728736,0.000058027206,0.00034296425,0.00004946503],"domain_scores_gemma":[0.9974681,0.0018628784,0.000087541346,0.00016428958,0.0003376132,0.00007960391],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024662556,0.0004999409,0.00046953702,0.00028084219,0.0004998873,0.00067667686,0.0007555669,0.00050108973,0.0010341958],"category_scores_gemma":[0.004486751,0.00027820413,0.0002358179,0.00055945147,0.00047658375,0.0012685765,0.0006041627,0.0010398052,0.00017466437],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000426738,0.0005877493,0.010771238,0.00011393822,0.000044072956,0.00032042043,0.00074852,0.862567,0.0041021775,0.0020443406,0.0011056144,0.11716818],"study_design_scores_gemma":[0.00003585356,0.0004095998,0.0038981028,0.000013730274,0.000021232832,0.000082505714,0.00020950977,0.98796356,0.004063406,0.0014775633,0.0017972984,0.000027625305],"about_ca_topic_score_codex":0.022403644,"about_ca_topic_score_gemma":0.029614767,"teacher_disagreement_score":0.022403644,"about_ca_system_score_codex":0.0009957497,"about_ca_system_score_gemma":0.00070371653,"threshold_uncertainty_score":0.044546485},"labels":[],"label_agreement":null},{"id":"W2101054729","doi":"10.1109/pes.2007.386161","title":"Optimal Reactive Power Planning and Compensation Effects on Transmission Loss Components","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"AC power; Activity-based costing; Electric power transmission; Power-flow study; Compensation (psychology); Transmission (telecommunications); Computer science; Transmission line; Power transmission; Power (physics); Electricity market; Electricity; Engineering; Electrical engineering; Telecommunications; Voltage; Business","score_opus":0.005959586142731806,"score_gpt":0.2118546305941833,"score_spread":0.2058950444514515,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2101054729","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49508825,0.0006803104,0.48267433,0.0005532177,0.000069036745,0.00008803531,0.00018218825,0.0003311214,0.020333502],"genre_scores_gemma":[0.9919531,0.00007435806,0.0073755025,0.00002364838,0.000005713272,0.00001127938,0.000018047154,0.000021951982,0.0005164473],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994822,0.00020471597,0.000016638503,0.000063785556,0.00013067953,0.00010192845],"domain_scores_gemma":[0.9979831,0.0015284625,0.00022124774,0.00006663302,0.00015251375,0.000048003672],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00086946104,0.0006369605,0.0004213176,0.00036434236,0.00021668016,0.00076453306,0.00031011074,0.00038731788,0.0016807017],"category_scores_gemma":[0.005006872,0.00032420087,0.00019957608,0.00033959353,0.0006130955,0.0007938512,0.00032078233,0.00056508876,0.00010557746],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007467081,0.000018263512,0.00015301582,0.000014490653,0.0000050335907,0.000025557198,0.000008108118,0.9910483,0.0008921628,0.0022336394,0.00008904708,0.0054377355],"study_design_scores_gemma":[0.000016882632,0.00007896316,0.00049581437,0.0000069693615,0.00001657878,0.000019720394,0.000019744612,0.9933715,0.0022207361,0.003566692,0.00017939543,0.0000070057463],"about_ca_topic_score_codex":0.003963268,"about_ca_topic_score_gemma":0.0033874742,"teacher_disagreement_score":0.003963268,"about_ca_system_score_codex":0.0007788609,"about_ca_system_score_gemma":0.00085789536,"threshold_uncertainty_score":0.00788039},"labels":[],"label_agreement":null},{"id":"W2104690181","doi":"10.1109/tpwrs.2008.920729","title":"Electricity Markets Cleared by Merit Order—Part II: Strategic Offers and Market Power","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Clearance; Electricity market; Profit (economics); Market power; Economics; Linear programming; Electric power system; Order (exchange); Electricity; Integer programming; Nash equilibrium; Identification (biology); Scheme (mathematics); Computer science; Microeconomics; Mathematical optimization; Operations research; Power (physics); Mathematics; Engineering; Monopoly","score_opus":0.008896303743794999,"score_gpt":0.18282555306744513,"score_spread":0.17392924932365014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2104690181","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5834207,0.00035687175,0.3508521,0.0010887826,0.00010521149,0.00022559206,0.00020794001,0.00019433317,0.0635485],"genre_scores_gemma":[0.98209447,0.000081485894,0.013120279,0.000040705607,0.000022695547,0.000054780136,0.000047229372,0.000022651222,0.0045156847],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989875,0.00033955462,0.00003136422,0.00008771434,0.00034232534,0.000211509],"domain_scores_gemma":[0.9976603,0.0012058658,0.00051398523,0.00020509464,0.00023296675,0.00018176132],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014996242,0.00054292474,0.0011821035,0.00041352084,0.0009653098,0.004104749,0.0010218867,0.0011308183,0.00579118],"category_scores_gemma":[0.005933572,0.00042816743,0.0007068669,0.000616442,0.0020205653,0.0036619091,0.0009921206,0.0017200443,0.0003807578],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000553667,0.00017557779,0.0019339795,0.0000829699,0.000035209952,0.00070248725,0.0001954858,0.4656739,0.0034079696,0.5091593,0.0017138799,0.016365515],"study_design_scores_gemma":[0.00007920721,0.000119351724,0.0010086185,0.000013390688,0.000010974993,0.00015139907,0.00012766357,0.8114096,0.0015819378,0.18346366,0.002005915,0.000028266613],"about_ca_topic_score_codex":0.001950459,"about_ca_topic_score_gemma":0.00256308,"teacher_disagreement_score":0.00579118,"about_ca_system_score_codex":0.0016527702,"about_ca_system_score_gemma":0.0016383211,"threshold_uncertainty_score":0.019373477},"labels":[],"label_agreement":null},{"id":"W2104938392","doi":"10.3905/jsf.2000.320213","title":"The Development of the Merchant Power Market in Alberta","year":2000,"lang":"en","type":"article","venue":"The journal of structured finance","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Deregulation; Business; Web syndication; Hydroelectricity; Power market; Market power; Power (physics); Government (linguistics); Finance; Market economy; Economics; Monopoly; Engineering; Electric power system","score_opus":0.002961072208725651,"score_gpt":0.1728979338892391,"score_spread":0.16993686168051345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2104938392","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30730152,0.0023097997,0.0025946482,0.010362077,0.00013218535,0.000060361617,0.0004874293,0.00009137821,0.6766606],"genre_scores_gemma":[0.8877684,0.0021154548,0.0012647264,0.0005133187,0.00003224102,0.00000784125,0.00021448423,0.00002230788,0.1080612],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9994849,0.000025493215,0.000005552028,0.000041480205,0.00026442256,0.00017812339],"domain_scores_gemma":[0.9994791,0.00004287994,0.000028535256,0.000014021729,0.00022113186,0.00021441607],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038100433,0.00016942093,0.00014025954,0.00080740126,0.003749538,0.004731424,0.0007641547,0.000770899,0.009597461],"category_scores_gemma":[0.0009217287,0.00021834364,0.00017668045,0.000998265,0.0022066883,0.0010059112,0.0011622028,0.0011054965,0.0005009598],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022799025,0.00010736251,0.013078465,0.000084169405,0.000018197929,0.0034002392,0.0029311152,0.011084559,0.0036025648,0.87425584,0.036053285,0.055156246],"study_design_scores_gemma":[0.00007228387,0.00013126343,0.06931832,0.00019100538,0.000030523024,0.00061164924,0.007468388,0.019625667,0.002602817,0.05970752,0.8401165,0.00012400978],"about_ca_topic_score_codex":0.92748815,"about_ca_topic_score_gemma":0.9641707,"teacher_disagreement_score":0.07251185,"about_ca_system_score_codex":0.033069264,"about_ca_system_score_gemma":0.03967961,"threshold_uncertainty_score":0.23993546},"labels":[],"label_agreement":null},{"id":"W2105207191","doi":"10.1111/joie.12081","title":"Strategic Investment under Open Access: Theory and Evidence","year":2015,"lang":"en","type":"article","venue":"Journal of Industrial Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Competitor analysis; Incentive; Investment (military); Business; Industrial organization; Ceteris paribus; Market share; Investment strategy; Microeconomics; Monetary economics; Economics; Finance; Marketing","score_opus":0.2607980158913065,"score_gpt":0.3314524652436848,"score_spread":0.0706544493523783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105207191","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82991177,0.01149982,0.05665917,0.008512729,0.00009995762,0.00009600646,0.0011089913,0.00014975654,0.09196172],"genre_scores_gemma":[0.99600726,0.0018612476,0.0006422961,0.00024071407,0.00008887907,0.000016716756,0.000109929184,0.0000065333656,0.0010264665],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9976361,0.0008917997,0.00013967692,0.00041479102,0.00050024956,0.00041750757],"domain_scores_gemma":[0.90277094,0.06523222,0.025464082,0.0026830519,0.0020093895,0.0018403741],"candidate_categories":["scholarly_communication","open_science"],"consensus_categories":[],"category_scores_codex":[0.0042125443,0.0005602073,0.00077662885,0.0013932972,0.0006570281,0.0033304698,0.0011022935,0.0018417159,0.010164005],"category_scores_gemma":[0.025749408,0.00049445167,0.0007764791,0.0018086185,0.0037574014,0.004354143,0.0017516112,0.0019097588,0.00054098887],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00077322224,0.0007205045,0.24097168,0.0010938239,0.00084416295,0.0008760243,0.0007862564,0.09390674,0.0010834927,0.56879455,0.006104413,0.08404507],"study_design_scores_gemma":[0.0003689128,0.0005512228,0.12003147,0.0004582028,0.0005522774,0.00045884648,0.0011752755,0.11660346,0.0015086577,0.7430699,0.015080331,0.00014147349],"about_ca_topic_score_codex":0.006472937,"about_ca_topic_score_gemma":0.004721651,"teacher_disagreement_score":0.99889773,"about_ca_system_score_codex":0.0017022096,"about_ca_system_score_gemma":0.001038489,"threshold_uncertainty_score":0.034001946},"labels":[],"label_agreement":null},{"id":"W2105225820","doi":"10.1016/j.enpol.2009.07.064","title":"Complementarity of hydro and wind power: Improving the risk profile of energy inflows","year":2009,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":103,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Bank of Canada; Bank of Canada; Group for Research in Decision Analysis; HEC Montréal","funders":"","keywords":"Wind power; Renewable energy; Portfolio; Hydropower; Hydroelectricity; Environmental science; Diversification (marketing strategy); Inflow; Risk measure; Wind speed; Value at risk; Natural resource economics; Economics; Meteorology; Risk management; Business; Engineering; Geography; Financial economics; Finance","score_opus":0.0037814979305988,"score_gpt":0.19627018351151376,"score_spread":0.19248868558091498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105225820","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22315861,0.0006918124,0.7590626,0.0026541615,0.000115978546,0.000067640976,0.0002762987,0.00023858585,0.013734343],"genre_scores_gemma":[0.9881479,0.00019642727,0.0099333115,0.00010507678,0.00006746626,0.00002166813,0.00005991087,0.000034879315,0.0014332008],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988217,0.0006310994,0.00004230406,0.00012106735,0.00021092806,0.00017298094],"domain_scores_gemma":[0.9934962,0.0049363445,0.00060479285,0.00026829535,0.00041803057,0.00027623575],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027714688,0.0008633466,0.0014138018,0.0007438595,0.00040359062,0.0019206145,0.0009232572,0.001163035,0.0023074523],"category_scores_gemma":[0.013710438,0.00080037606,0.00052953046,0.00081856706,0.000855341,0.0029315322,0.0017340239,0.001611813,0.00017639495],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014254182,0.000034451856,0.0012864589,0.000025811125,0.000036245827,0.000063430336,0.00002435368,0.9676623,0.0004765617,0.021511419,0.0004909752,0.0082454765],"study_design_scores_gemma":[0.000016498327,0.000040454244,0.00046286616,0.000009227904,0.000014493308,0.000015143876,0.000021153846,0.9774728,0.00032779362,0.02135949,0.00025028308,0.000009771496],"about_ca_topic_score_codex":0.004304392,"about_ca_topic_score_gemma":0.0032307734,"teacher_disagreement_score":0.004304392,"about_ca_system_score_codex":0.0011023113,"about_ca_system_score_gemma":0.0017438974,"threshold_uncertainty_score":0.01465708},"labels":[],"label_agreement":null},{"id":"W2105822997","doi":"10.1109/pess.2001.970292","title":"Assessment of transmission congestion cost and locational marginal pricing in a competitive electricity market","year":2001,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Computer science; Electricity market; Reliability (semiconductor); Transmission (telecommunications); Transmission network; Electricity; Transmission system; Marginal cost; Electric power transmission; Reliability engineering; Network topology; Stability (learning theory); Mathematical optimization; Computer network; Telecommunications; Engineering; Economics; Electrical engineering; Power (physics); Mathematics","score_opus":0.006011406370333492,"score_gpt":0.22922993772757191,"score_spread":0.22321853135723843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105822997","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8813312,0.00015376476,0.10820533,0.00023519606,0.000018357421,0.00014561017,0.00020237264,0.00009463385,0.009613603],"genre_scores_gemma":[0.9937484,0.000030467432,0.0057536946,0.0000044825606,0.0000059268355,0.000022628024,0.00004741823,0.000010956796,0.00037602062],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988374,0.00062367105,0.000026723628,0.000059977432,0.00034981305,0.000102447506],"domain_scores_gemma":[0.9957723,0.003149664,0.00031081057,0.00015162786,0.00048235466,0.00013332072],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002870439,0.0006929932,0.0005790656,0.0014249621,0.0003508874,0.0014782266,0.0009479961,0.00078595796,0.0018825235],"category_scores_gemma":[0.010616208,0.00041778226,0.000456555,0.0011282644,0.0006818677,0.0026407912,0.0007040405,0.00058531004,0.00009931814],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013330443,0.00006545216,0.003719545,0.000023153729,0.000029135324,0.00010196535,0.000026665719,0.97503734,0.0004862551,0.013249747,0.0002498922,0.006877488],"study_design_scores_gemma":[0.000006586674,0.00003097902,0.001102208,8.994072e-7,0.0000045787924,0.000012875878,0.000015497331,0.99717534,0.00017136155,0.0014233012,0.00005149934,0.000004886349],"about_ca_topic_score_codex":0.017235499,"about_ca_topic_score_gemma":0.011607713,"teacher_disagreement_score":0.017235499,"about_ca_system_score_codex":0.0018794762,"about_ca_system_score_gemma":0.0013866323,"threshold_uncertainty_score":0.034270346},"labels":[],"label_agreement":null},{"id":"W2106109980","doi":"10.1109/tpwrs.2012.2210574","title":"Options based reserve procurement strategy for wind generators - Using binomial trees","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Wind power; Procurement; Renewable energy; Electricity market; Activity-based costing; Electricity; Economics; Purchasing; Reserve requirement; Environmental economics; Computer science; Business; Operations management; Engineering; Electrical engineering","score_opus":0.04232265863417425,"score_gpt":0.25897634296121874,"score_spread":0.2166536843270445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106109980","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08518106,0.00026445207,0.9023921,0.00027874627,0.00005017062,0.00011122741,0.000054873533,0.00014778374,0.011519682],"genre_scores_gemma":[0.95553464,0.00015885067,0.039540842,0.00005516419,0.000022617152,0.00008990774,0.000039710998,0.000025907459,0.004532283],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928397,0.00033273423,0.00003317952,0.00006227291,0.00016419531,0.0001236941],"domain_scores_gemma":[0.99876595,0.0008335738,0.00012007647,0.00003948916,0.00014125546,0.000099637306],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018273671,0.0005288959,0.00077096256,0.00052610436,0.00048138946,0.0011862529,0.0011210387,0.0008724328,0.005281201],"category_scores_gemma":[0.0036364065,0.00045708104,0.00057611265,0.0006167446,0.0006259877,0.0013886607,0.0007446659,0.00067081803,0.00046610014],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022373717,0.00007401911,0.0006797122,0.000053539985,0.000025675834,0.0002606392,0.00009464571,0.91886306,0.0022453074,0.037627507,0.0008558102,0.038996387],"study_design_scores_gemma":[0.000012800884,0.000050215804,0.000091651586,0.0000049565474,0.000005689987,0.000033793964,0.0000129433065,0.9928888,0.00024431775,0.0064157513,0.00023122081,0.000007819078],"about_ca_topic_score_codex":0.0017736101,"about_ca_topic_score_gemma":0.0020026613,"teacher_disagreement_score":0.005281201,"about_ca_system_score_codex":0.00078251393,"about_ca_system_score_gemma":0.0006233812,"threshold_uncertainty_score":0.017667413},"labels":[],"label_agreement":null},{"id":"W2106877775","doi":"10.1049/iet-gtd.2012.0573","title":"Fuzzy security constraints for unit commitment with outages","year":2013,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Power system simulation; Fuzzy logic; Integer programming; Computer science; Mathematical optimization; Schedule; Electric power system; Linear programming; Electric power transmission; Transmission line; Power (physics); Reliability engineering; Engineering; Algorithm; Mathematics","score_opus":0.01222486487577415,"score_gpt":0.21512949329937173,"score_spread":0.20290462842359758,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106877775","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010536017,0.00029738032,0.9748677,0.00030017667,0.0000690648,0.00008979521,0.00018646021,0.00008679246,0.013566737],"genre_scores_gemma":[0.7622623,0.0007112654,0.22884625,0.00019880597,0.00010832834,0.00044990305,0.0003787496,0.00009215266,0.006952384],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99908364,0.0004140458,0.00003756312,0.000102635415,0.0002839135,0.00007820551],"domain_scores_gemma":[0.9990451,0.0006394673,0.00009727483,0.00004936023,0.00013368748,0.0000350317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015160511,0.0012367683,0.0007536602,0.00054145674,0.00044802274,0.001222957,0.00120394,0.0010088028,0.006939295],"category_scores_gemma":[0.0038288366,0.0005037073,0.00073875726,0.0009306875,0.00060295954,0.0011388052,0.00093493453,0.0016307537,0.0006696105],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023710316,0.000014382172,0.00009503719,0.00005523633,0.000018309649,0.00007773698,0.000036489808,0.9474175,0.0004702267,0.04016558,0.0009939891,0.0106317615],"study_design_scores_gemma":[0.00000692984,0.000012652696,0.0000351781,0.0000119952565,0.0000033369301,0.000012998667,0.000010308488,0.986665,0.00017539017,0.012292377,0.0007696699,0.0000040719933],"about_ca_topic_score_codex":0.0060936273,"about_ca_topic_score_gemma":0.004884931,"teacher_disagreement_score":0.006939295,"about_ca_system_score_codex":0.0008988043,"about_ca_system_score_gemma":0.0013794136,"threshold_uncertainty_score":0.023214221},"labels":[],"label_agreement":null},{"id":"W2107073001","doi":"10.3138/infor.48.4.239","title":"Analysis of Quantized Double Auctions with Application to Competitive Electricity Markets","year":2010,"lang":"en","type":"article","venue":"INFOR Information Systems and Operational Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Common value auction; Maximization; Electricity; Computer science; Microeconomics; Double auction; Economics; Competition (biology); Electricity market; Mathematical optimization; Mathematics; Engineering; Electrical engineering","score_opus":0.014404993927121702,"score_gpt":0.29294525502716917,"score_spread":0.2785402611000475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107073001","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07302107,0.00062179106,0.91750944,0.00033647622,0.000064838285,0.00009178436,0.000049945233,0.00009233887,0.008212273],"genre_scores_gemma":[0.946167,0.00044097882,0.05012512,0.000082851584,0.000046749396,0.00010240898,0.000042999847,0.000032323675,0.0029595925],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99869967,0.0005164143,0.00005532653,0.00013365808,0.00042743186,0.00016742545],"domain_scores_gemma":[0.99503917,0.003474041,0.0004942934,0.00023063137,0.0005769131,0.00018494781],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024957305,0.00075554603,0.0009834428,0.00066560524,0.00050747715,0.00210513,0.0015795015,0.00086691556,0.003386423],"category_scores_gemma":[0.012259091,0.000517725,0.00059934444,0.00096304534,0.0019891076,0.0025121062,0.0013245877,0.001442515,0.00017157548],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008384207,0.000051241757,0.00048554086,0.000119956276,0.000030973028,0.00012348716,0.00011626029,0.6755275,0.0010841318,0.30879992,0.00061939587,0.012957713],"study_design_scores_gemma":[0.000012310702,0.000019658379,0.00006449504,0.000005761859,0.000003897992,0.000019482084,0.00001871909,0.9563975,0.00011781311,0.043116055,0.00021807363,0.0000062775052],"about_ca_topic_score_codex":0.0032272297,"about_ca_topic_score_gemma":0.0016922487,"teacher_disagreement_score":0.003386423,"about_ca_system_score_codex":0.0017117758,"about_ca_system_score_gemma":0.0015300098,"threshold_uncertainty_score":0.013198853},"labels":[],"label_agreement":null},{"id":"W2107818050","doi":"10.1109/pes.2007.385587","title":"A Reactive Power Model for a Simultaneous Real and Reactive Power Dispatch","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Natural Sciences and Engineering Research Council of Canada; Manitoba Hydro","keywords":"AC power; Power (physics); Computer science; Generator (circuit theory); Electricity; Economic dispatch; Component (thermodynamics); Electric power system; Power-flow study; Constraint (computer-aided design); Engineering; Electrical engineering","score_opus":0.005461020930247967,"score_gpt":0.2153984982752598,"score_spread":0.20993747734501184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107818050","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0049934965,0.00017123428,0.9761328,0.00041715842,0.00013014028,0.000042317948,0.00021391573,0.00024176363,0.017657192],"genre_scores_gemma":[0.7714305,0.0007800415,0.15323268,0.00039940578,0.00042885207,0.00045458914,0.00056372315,0.00048418014,0.072226],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99949145,0.00015904293,0.000022552738,0.00011090614,0.00016617292,0.000049861614],"domain_scores_gemma":[0.99949694,0.00023186176,0.000086669,0.000047106518,0.0001030253,0.000034427136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000945324,0.0011537563,0.00087940553,0.00043065008,0.00047809238,0.0017883453,0.0026305316,0.0019030519,0.009908569],"category_scores_gemma":[0.0017096545,0.0006171586,0.0009617804,0.000697222,0.0008168859,0.0024522124,0.0008179021,0.0024786368,0.0026982285],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000399276,0.000026827835,0.00007416372,0.000037618625,0.000014887957,0.00012213428,0.00004876376,0.87198263,0.0010793095,0.12057628,0.0014157804,0.0045817792],"study_design_scores_gemma":[0.000014910976,0.000014518772,0.000021014836,0.000003020841,0.0000042543925,0.000017216084,0.0000039150827,0.9819338,0.00007202934,0.01648729,0.0014237763,0.000004305609],"about_ca_topic_score_codex":0.006004316,"about_ca_topic_score_gemma":0.0054972614,"teacher_disagreement_score":0.009908569,"about_ca_system_score_codex":0.0010511071,"about_ca_system_score_gemma":0.0012417672,"threshold_uncertainty_score":0.033147454},"labels":[],"label_agreement":null},{"id":"W2107890899","doi":"10.1109/ccece.2001.933587","title":"Counter-flow in a deregulated power system network and its effect on transmission loss allocation","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Generator (circuit theory); Computer science; Transmission (telecommunications); Flow (mathematics); Transmission loss; Electric power system; Transmission system; Power-flow study; Power (physics); Telecommunications; Mathematics","score_opus":0.003811469292738933,"score_gpt":0.17129057429562752,"score_spread":0.1674791050028886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107890899","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47148502,0.0005680193,0.523191,0.00030818215,0.000080240774,0.00007109989,0.00012024481,0.00058941945,0.0035868133],"genre_scores_gemma":[0.9643944,0.00019994167,0.034498475,0.000038121783,0.000010442848,0.000023491837,0.000058595415,0.000042589858,0.00073391874],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995332,0.00025304675,0.000017509916,0.000061042796,0.000074655734,0.000060470684],"domain_scores_gemma":[0.9969031,0.0021032384,0.00043962395,0.00014590786,0.0003124562,0.000095723575],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001762191,0.0007338463,0.00047675194,0.0007015049,0.0003251468,0.00087638875,0.0006787521,0.00037938094,0.0012983709],"category_scores_gemma":[0.005165329,0.00028196417,0.00021732115,0.0006105929,0.00068541523,0.001983321,0.00045820195,0.00053792045,0.000100817575],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034809572,0.000053864373,0.0021179472,0.00003151,0.000016778493,0.00008680871,0.00004267969,0.9548068,0.0019487102,0.007830542,0.00029670956,0.032419503],"study_design_scores_gemma":[0.000014060261,0.00006588752,0.00047056313,0.0000057658917,0.000009605873,0.000031896667,0.000012314124,0.9943334,0.0018587506,0.0028822832,0.00030987168,0.0000056240315],"about_ca_topic_score_codex":0.0030734115,"about_ca_topic_score_gemma":0.00272663,"teacher_disagreement_score":0.0030734115,"about_ca_system_score_codex":0.0010000408,"about_ca_system_score_gemma":0.00057895685,"threshold_uncertainty_score":0.009319484},"labels":[],"label_agreement":null},{"id":"W2108380909","doi":"10.4236/ti.2010.12014","title":"Sub-Optimal Generation Portfolio Variance with Rate of Return Regulation","year":2010,"lang":"en","type":"article","venue":"Technology and Investment","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Rate of return on a portfolio; Portfolio; Rate of return; Asset (computer security); Marginal cost; Transmission (telecommunications); Portfolio optimization; Capital asset pricing model; Economics; Econometrics; Microeconomics; Computer science; Financial economics; Finance; Telecommunications","score_opus":0.004185490051088809,"score_gpt":0.17389536423253707,"score_spread":0.16970987418144826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2108380909","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21739742,0.0008981097,0.7578952,0.0008583994,0.00005821178,0.00008617948,0.00016275838,0.00039930094,0.022244489],"genre_scores_gemma":[0.98037475,0.00022382349,0.01631937,0.000114776216,0.000034144225,0.000043031974,0.000044962577,0.000055988483,0.002789097],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982357,0.00092593225,0.000046387122,0.00024558944,0.000277449,0.00026888892],"domain_scores_gemma":[0.9965383,0.0023471327,0.00043094356,0.0002983637,0.0002657174,0.00011952527],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034448712,0.000767465,0.0013955535,0.0003764941,0.00021413057,0.0015684217,0.0007916873,0.00094729953,0.001679789],"category_scores_gemma":[0.012303561,0.00055900344,0.00044887667,0.0004760031,0.0008191312,0.0016632677,0.0009069312,0.0011204456,0.00030332775],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013980546,0.000055717097,0.00073358597,0.00004347205,0.000041292216,0.00008317292,0.000023778388,0.93866426,0.001090359,0.046627026,0.00078358303,0.011713909],"study_design_scores_gemma":[0.000026968939,0.000066088935,0.00045451056,0.000008307417,0.000017450906,0.00004796755,0.000012407126,0.9705344,0.00046828267,0.02799154,0.00036164687,0.00001039891],"about_ca_topic_score_codex":0.0009410425,"about_ca_topic_score_gemma":0.0005673373,"teacher_disagreement_score":0.0034448712,"about_ca_system_score_codex":0.0010406703,"about_ca_system_score_gemma":0.0011174078,"threshold_uncertainty_score":0.018218398},"labels":[],"label_agreement":null},{"id":"W2108794066","doi":"","title":"\"Gansch het raderwerk staat stil.\" De kosten van stroomstoringen","year":2003,"lang":"nl","type":"article","venue":"UvA-DARE (University of Amsterdam)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.007356978181927423,"score_gpt":0.17307464090910882,"score_spread":0.1657176627271814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2108794066","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0384917,0.0060646026,0.0028069997,0.05059477,0.0021095003,0.00016267374,0.0025253554,0.0006189576,0.89662546],"genre_scores_gemma":[0.079273574,0.0028970293,0.001490228,0.0060978234,0.00016261195,0.00006195206,0.0010199046,0.00020401049,0.90879285],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982468,0.00024703165,0.000062030434,0.00031178148,0.0006638876,0.00046846145],"domain_scores_gemma":[0.99901557,0.00012603903,0.00009772273,0.00010494492,0.0003164357,0.00033918273],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012191789,0.00053525786,0.00031604286,0.00094092946,0.0034257453,0.005134306,0.0012056901,0.001961557,0.16388331],"category_scores_gemma":[0.0021854348,0.0004682881,0.0005809762,0.0010824369,0.0024065867,0.0025435826,0.0041282144,0.0029155978,0.0433806],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002044034,0.00013352242,0.011889996,0.00056436105,0.000055385088,0.00044924408,0.0068128365,0.00046975294,0.0032443972,0.22327714,0.5250386,0.22786035],"study_design_scores_gemma":[0.0000069021407,0.0000249312,0.0052357484,0.00013338201,0.000007277187,0.000073850315,0.0017165908,0.000036328518,0.00031210267,0.0023478973,0.9900907,0.000014366556],"about_ca_topic_score_codex":0.07791761,"about_ca_topic_score_gemma":0.18273644,"teacher_disagreement_score":0.16388331,"about_ca_system_score_codex":0.0049264967,"about_ca_system_score_gemma":0.009651954,"threshold_uncertainty_score":0.5482443},"labels":[],"label_agreement":null},{"id":"W2109107914","doi":"10.1109/tpwrs.2004.835638","title":"Pay-as-Bid versus Marginal Pricing—Part I: Strategic Generator Offers","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Tsinghua University","keywords":"Payment; Generator (circuit theory); Economics; Marginal cost; Microeconomics; Electricity market; Yield (engineering); Electricity; Marginal utility; Econometrics; Power (physics); Finance; Engineering; Electrical engineering","score_opus":0.01594394157016829,"score_gpt":0.2158812997562269,"score_spread":0.19993735818605862,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109107914","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37339792,0.00078032276,0.5805843,0.0013875178,0.00010160236,0.00023433674,0.0001351179,0.00018284432,0.043195985],"genre_scores_gemma":[0.9838219,0.0000869606,0.01503074,0.000071449955,0.000019466159,0.00005144669,0.000019443192,0.000017108816,0.00088146963],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9964288,0.002372435,0.00008026666,0.00024134475,0.0006354198,0.0002417707],"domain_scores_gemma":[0.99261016,0.0052955407,0.0006370096,0.0007938551,0.00047326123,0.00019016072],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006117931,0.00054612086,0.00096673303,0.00039970147,0.00044005725,0.002383906,0.0014601606,0.0010784756,0.0043240823],"category_scores_gemma":[0.018817557,0.00043780202,0.0008889582,0.0005073081,0.0019079907,0.0042531285,0.0012941677,0.0012783775,0.0002681431],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00056172383,0.00016085847,0.0045158295,0.00025137662,0.00011054702,0.00019992563,0.00022531771,0.2635045,0.0029749498,0.69230187,0.0012759739,0.033917096],"study_design_scores_gemma":[0.00017053564,0.0008709656,0.003924473,0.000055127413,0.00007404068,0.0004541766,0.00031315896,0.6513705,0.0037746937,0.33622897,0.0026923502,0.00007103664],"about_ca_topic_score_codex":0.0006420155,"about_ca_topic_score_gemma":0.0006414647,"teacher_disagreement_score":0.006117931,"about_ca_system_score_codex":0.0011263968,"about_ca_system_score_gemma":0.0012468208,"threshold_uncertainty_score":0.03235507},"labels":[],"label_agreement":null},{"id":"W2109591158","doi":"10.1260/0309-524x.32.4.355","title":"Using Standard Deviation as a Measure of Increased Operational Reserve Requirement for Wind Power","year":2008,"lang":"en","type":"article","venue":"Wind Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":186,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Manitoba Hydro","funders":"","keywords":"Wind power; Environmental science; Standard deviation; Predictability; Flexibility (engineering); Measure (data warehouse); Electric power system; Power (physics); Statistics; Computer science; Mathematics; Engineering","score_opus":0.02622954555920999,"score_gpt":0.2344191804871257,"score_spread":0.2081896349279157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109591158","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45113915,0.002961197,0.52338725,0.00068438455,0.0005454245,0.00016072197,0.002346116,0.00083022617,0.017945543],"genre_scores_gemma":[0.9618142,0.000463205,0.034726195,0.00011572784,0.000104308885,0.00009360707,0.001083238,0.0000836739,0.0015158656],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99106467,0.0024976917,0.00089324085,0.0010363574,0.004251846,0.0002561053],"domain_scores_gemma":[0.94442546,0.03861814,0.007188174,0.0053309374,0.00410793,0.00032932052],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008907312,0.0007220674,0.0007909882,0.0023563213,0.0002700478,0.0016168192,0.0010830857,0.0009584712,0.0016177709],"category_scores_gemma":[0.032132477,0.00021350366,0.0011163433,0.002744748,0.0007831584,0.0017837536,0.0009413133,0.0012765725,0.0004929049],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001874148,0.0005049794,0.33681467,0.001405089,0.003344564,0.0014228468,0.001307437,0.31354687,0.035616573,0.03839797,0.0065423325,0.25922242],"study_design_scores_gemma":[0.00009930582,0.0031738686,0.4702665,0.00045595717,0.0007447219,0.003508137,0.0011300889,0.39333382,0.05524572,0.046468385,0.024872225,0.000701327],"about_ca_topic_score_codex":0.0011390656,"about_ca_topic_score_gemma":0.0008857277,"teacher_disagreement_score":0.008907312,"about_ca_system_score_codex":0.0005147566,"about_ca_system_score_gemma":0.0003696848,"threshold_uncertainty_score":0.04710698},"labels":[],"label_agreement":null},{"id":"W2109883243","doi":"10.1590/s0103-17592003000300006","title":"Transmission loss allocation under combined pool and bilateral operation","year":2003,"lang":"en","type":"article","venue":"Sba Controle & Automação Sociedade Brasileira de Automatica","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Transmission loss; Product (mathematics); Transmission (telecommunications); Computer science; Mathematical optimization; Operations management; Economics; Mathematics; Telecommunications","score_opus":0.005847288060971028,"score_gpt":0.21214645861622436,"score_spread":0.20629917055525332,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109883243","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8039133,0.00011283298,0.18609922,0.00011280179,0.000014040664,0.00003223053,0.0000606073,0.000095318945,0.009559651],"genre_scores_gemma":[0.9965379,0.000023901239,0.0023608268,0.000004393891,0.0000036034578,0.000012412518,0.000010228075,0.000009663488,0.0010371042],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999411,0.00021556558,0.000019899013,0.00006361213,0.00014973003,0.00014019644],"domain_scores_gemma":[0.9991049,0.00042569783,0.00021271182,0.00006539054,0.00011107872,0.000080148435],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012109246,0.00036643265,0.000502655,0.00038966088,0.0003072781,0.0008440611,0.00063639256,0.00034533633,0.002349279],"category_scores_gemma":[0.0025955304,0.00024199736,0.0003038351,0.0004238466,0.00075471593,0.0011418522,0.0010775427,0.00032981046,0.00015396118],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038875834,0.000026959478,0.000985231,0.000032034626,0.000025443693,0.00019391639,0.00005630349,0.97249687,0.0059373765,0.0074131293,0.00017308047,0.012270839],"study_design_scores_gemma":[0.000033556862,0.00013356446,0.0010996398,0.0000033138388,0.000017107715,0.00004656883,0.00004441477,0.99183184,0.0020302138,0.0045067803,0.00024352342,0.000009558763],"about_ca_topic_score_codex":0.0016998467,"about_ca_topic_score_gemma":0.0014335581,"teacher_disagreement_score":0.002349279,"about_ca_system_score_codex":0.00079211703,"about_ca_system_score_gemma":0.00041746878,"threshold_uncertainty_score":0.00785917},"labels":[],"label_agreement":null},{"id":"W2109887918","doi":"10.1109/ccece.2005.1556993","title":"Determination of loss factors in a deregulated system","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Computer science; Transmission loss; Electric power system; Generator (circuit theory); Transmission system; Operator (biology); Profit (economics); Reliability engineering; Transmission (telecommunications); Telecommunications; Power (physics); Engineering; Economics; Microeconomics","score_opus":0.003248807583823899,"score_gpt":0.17057610946844082,"score_spread":0.16732730188461692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109887918","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35801178,0.00031016613,0.6355721,0.000103804,0.000018128972,0.00008666015,0.00019448352,0.00031397407,0.005388967],"genre_scores_gemma":[0.9742666,0.00014496426,0.024344748,0.000009249887,0.0000045591996,0.000024542658,0.00006305189,0.000038622067,0.0011037017],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996556,0.00009901106,0.000016042164,0.000059183465,0.000119425466,0.000050758725],"domain_scores_gemma":[0.9994142,0.00033434588,0.00009483889,0.000025244573,0.00011072415,0.000020647729],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008070455,0.00076211157,0.000670593,0.0010387102,0.00039225747,0.0011969062,0.00047887937,0.00041567124,0.001405812],"category_scores_gemma":[0.002577168,0.00041578582,0.00039511934,0.00068432785,0.00048373334,0.0014343672,0.0003927246,0.00061145826,0.00019947735],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006799097,0.000014150609,0.0014916966,0.000030313746,0.000013561453,0.00009640968,0.000040248713,0.98112744,0.003261056,0.0033452162,0.0001214023,0.010390587],"study_design_scores_gemma":[0.0000050710923,0.000023440087,0.0007285981,0.0000032909193,0.0000058073197,0.000027603635,0.000019884466,0.99652076,0.0013403167,0.001128463,0.0001904235,0.0000063724624],"about_ca_topic_score_codex":0.004449427,"about_ca_topic_score_gemma":0.0036072212,"teacher_disagreement_score":0.004449427,"about_ca_system_score_codex":0.0013717897,"about_ca_system_score_gemma":0.0006598891,"threshold_uncertainty_score":0.009953022},"labels":[],"label_agreement":null},{"id":"W2110167161","doi":"10.1109/59.852113","title":"Allocation of transmission losses to bilateral contracts in a competitive environment","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":170,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Mathematical optimization; Database transaction; Infinitesimal; Computer science; Component (thermodynamics); Set (abstract data type); Path (computing); Transmission loss; Transmission (telecommunications); Cover (algebra); Transaction cost; Argument (complex analysis); Electric power system; Power (physics); Economics; Mathematics; Microeconomics; Engineering; Telecommunications","score_opus":0.005060380664373658,"score_gpt":0.1880829258552522,"score_spread":0.18302254519087852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110167161","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23938958,0.00023029049,0.73417115,0.0006389203,0.00004579718,0.00011551254,0.00005573365,0.00009743937,0.025255471],"genre_scores_gemma":[0.96455127,0.00017027848,0.031436875,0.000033985027,0.00001651103,0.000070511895,0.000016089716,0.0000321302,0.003672372],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99867153,0.0006990875,0.000035533176,0.000094879106,0.00032584835,0.00017314737],"domain_scores_gemma":[0.99865544,0.0007943688,0.00017703875,0.000106435335,0.00016733963,0.000099358615],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024499332,0.00043792912,0.0004953015,0.0003902702,0.0006391735,0.0020343484,0.00096172676,0.0009427102,0.0033376524],"category_scores_gemma":[0.0073805526,0.00036004558,0.00029425774,0.0006460675,0.0013938474,0.0023192258,0.0018764266,0.0010843172,0.00022316727],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000119970544,0.00006513895,0.00036802527,0.000033624165,0.0000111207,0.000093708535,0.0001596645,0.75914645,0.001388356,0.20924559,0.0007010414,0.028667197],"study_design_scores_gemma":[0.000019749978,0.000045050067,0.00019762159,0.000007397086,0.0000061737396,0.000026646137,0.000069946065,0.9298644,0.00052724825,0.068331346,0.0008939957,0.000010475458],"about_ca_topic_score_codex":0.0022076892,"about_ca_topic_score_gemma":0.0023842803,"teacher_disagreement_score":0.0033376524,"about_ca_system_score_codex":0.0020719634,"about_ca_system_score_gemma":0.0013629645,"threshold_uncertainty_score":0.0150331855},"labels":[],"label_agreement":null},{"id":"W2113075408","doi":"10.1109/pct.2007.4538446","title":"Electricity Markets under Uncertainty","year":2007,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Randomness; Supply and demand; Electricity market; Variance (accounting); Mains electricity; Minification; Economics; Work (physics); Computer science; Econometrics; Microeconomics; Mathematical optimization; Engineering; Mathematics; Electrical engineering","score_opus":0.005152174112361755,"score_gpt":0.2020064040283931,"score_spread":0.19685422991603133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113075408","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07130376,0.01431362,0.69760484,0.022436516,0.00091106317,0.00011194588,0.00047328937,0.0001913641,0.19265366],"genre_scores_gemma":[0.9593076,0.006368682,0.017445281,0.0008304264,0.0013972824,0.00012758316,0.00010915712,0.000039938543,0.014374093],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9980065,0.0009355815,0.00006332863,0.00019974263,0.0005624924,0.00023232552],"domain_scores_gemma":[0.99715143,0.0019489722,0.0002913629,0.00017998894,0.00029081214,0.00013757026],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023718171,0.00066929497,0.0009521332,0.0004851456,0.0008249486,0.0031048171,0.0007624156,0.0022650925,0.004738561],"category_scores_gemma":[0.008938698,0.00033015525,0.0006553683,0.00069945154,0.0025680147,0.0049682762,0.0015644416,0.0022345847,0.0004482043],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016808968,0.000006231501,0.00009781073,0.0000280249,0.00001361751,0.00009520495,0.000041463485,0.03211107,0.000102475635,0.96150994,0.0013955173,0.0045817355],"study_design_scores_gemma":[0.000010673756,0.000012737419,0.00008060875,0.000013099592,0.000004469268,0.000040157298,0.000026273934,0.043281864,0.00004872109,0.95311445,0.0033603387,0.0000066185426],"about_ca_topic_score_codex":0.0012014798,"about_ca_topic_score_gemma":0.00056857534,"teacher_disagreement_score":0.004738561,"about_ca_system_score_codex":0.0015101891,"about_ca_system_score_gemma":0.0010976252,"threshold_uncertainty_score":0.015852094},"labels":[],"label_agreement":null},{"id":"W2113280736","doi":"10.1109/psce.2006.296434","title":"A Unified Framework for Reactive Power Management in Deregulated Electricity Markets","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity market; Context (archaeology); Electricity; AC power; Electric power system; Computer science; Power (physics); Risk analysis (engineering); Industrial organization; Business; Engineering; Electrical engineering","score_opus":0.0041339290696831435,"score_gpt":0.2018621736173526,"score_spread":0.19772824454766944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113280736","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017547678,0.0006132942,0.9825706,0.00081797974,0.00015119255,0.000063637905,0.000087516055,0.00012737604,0.013813635],"genre_scores_gemma":[0.3706495,0.00506946,0.6056586,0.0006555337,0.0013291767,0.00080841075,0.0002910713,0.00026761147,0.015270701],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984377,0.00050305884,0.00009253564,0.00023733896,0.0005668684,0.00016254811],"domain_scores_gemma":[0.9994375,0.00015939967,0.00006791893,0.00009464937,0.00018232524,0.000058256977],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025394089,0.0013521243,0.0015112084,0.0010402274,0.0012606934,0.0049527255,0.0027266769,0.0020637568,0.004521247],"category_scores_gemma":[0.0018768464,0.0005890987,0.0015337748,0.0014522625,0.002480117,0.0049128784,0.0019001287,0.0027331207,0.0011001895],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006203907,0.000012811896,0.000020679157,0.000024102026,0.000007907609,0.0000447494,0.0000432256,0.0327224,0.00042590286,0.96138656,0.0008373981,0.0044681383],"study_design_scores_gemma":[0.000036307465,0.000047165333,0.00007691306,0.00005814335,0.000019681886,0.000070045164,0.000048716152,0.3182894,0.00050853664,0.6559241,0.024882888,0.000038161932],"about_ca_topic_score_codex":0.0034033936,"about_ca_topic_score_gemma":0.003940581,"teacher_disagreement_score":0.0049527255,"about_ca_system_score_codex":0.0021037073,"about_ca_system_score_gemma":0.0027449932,"threshold_uncertainty_score":0.015263498},"labels":[],"label_agreement":null},{"id":"W2113369277","doi":"10.1109/tpwrs.2010.2045663","title":"Optimal Allocation of ESS in Distribution Systems With a High Penetration of Wind Energy","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":466,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Sizing; Installation; Energy storage; Distributed generation; Reliability engineering; Electricity; Computer science; Environmental economics; Renewable energy; Environmental science; Engineering; Electrical engineering; Power (physics); Economics","score_opus":0.003358343786777668,"score_gpt":0.17515674847098514,"score_spread":0.17179840468420748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113369277","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5412079,0.0008974423,0.4345099,0.00046588358,0.000054461572,0.00026075434,0.0001681048,0.0002826007,0.022153009],"genre_scores_gemma":[0.98069227,0.00014046211,0.017619923,0.000018109968,0.0000069425214,0.0000314948,0.000017932178,0.000010211962,0.0014627173],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99964356,0.00017807573,0.000017644787,0.000040664425,0.000047385096,0.00007256535],"domain_scores_gemma":[0.9995993,0.00021041633,0.000072141105,0.000020325488,0.000058439087,0.000039533155],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006766417,0.0006921422,0.00067737786,0.00059214956,0.00031804046,0.0009682406,0.00041313688,0.0005427682,0.0021085758],"category_scores_gemma":[0.0012952621,0.00047474884,0.00022816488,0.00063472526,0.00054157135,0.00078783074,0.0005149895,0.00034419875,0.00017773513],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015272923,0.000040544583,0.00061520474,0.000040970044,0.00002033304,0.00010178686,0.000039552,0.9761677,0.0016785522,0.003420669,0.0003425574,0.017379528],"study_design_scores_gemma":[0.000042393094,0.00011605593,0.00060624303,0.000008172662,0.000023695093,0.00003775435,0.00007011825,0.99259394,0.0012083523,0.004660826,0.0006255039,0.000006974095],"about_ca_topic_score_codex":0.0035146184,"about_ca_topic_score_gemma":0.006174888,"teacher_disagreement_score":0.0035146184,"about_ca_system_score_codex":0.0009893257,"about_ca_system_score_gemma":0.0005960694,"threshold_uncertainty_score":0.0071781278},"labels":[],"label_agreement":null},{"id":"W2113553481","doi":"10.1002/etep.670","title":"Stochastic security-constrained joint market clearing for energy and reserves auctions considering uncertainties of wind power producers and unreliable equipment","year":2012,"lang":"en","type":"article","venue":"International Transactions on Electrical Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Clearing; Market clearing; Wind power; Stochastic programming; Common value auction; Electricity market; Mathematical optimization; Computer science; Reliability (semiconductor); Electric power system; Integer programming; Operations research; Reliability engineering; Power (physics); Electricity; Engineering; Economics; Microeconomics; Electrical engineering; Mathematics; Finance","score_opus":0.01183856559101399,"score_gpt":0.21262723805799968,"score_spread":0.2007886724669857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113553481","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051493183,0.0002560943,0.9433565,0.00035975367,0.000047527494,0.000089652516,0.0001865284,0.00012637547,0.0040844097],"genre_scores_gemma":[0.96017486,0.00025854548,0.035654664,0.00007987656,0.00004600545,0.00021914425,0.00020933777,0.00007322618,0.0032843438],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974147,0.0014574646,0.000094948045,0.00028426622,0.00038849254,0.00036013115],"domain_scores_gemma":[0.99489295,0.0033559417,0.00086898776,0.0001889558,0.0004570392,0.00023614071],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0042389114,0.0015882333,0.0027849148,0.0005824097,0.0005726852,0.0027985398,0.0017272761,0.0015487507,0.0032802739],"category_scores_gemma":[0.0072341952,0.0014008417,0.0014982647,0.00090342446,0.0016215915,0.0023254624,0.0015521885,0.0020965321,0.00033402597],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028622017,0.0000103292405,0.000069935304,0.000013488839,0.000010464052,0.000038997652,0.000008866932,0.9923693,0.000115577626,0.0065977997,0.00009586932,0.0006407538],"study_design_scores_gemma":[0.0000072953612,0.0000073439737,0.000023487497,0.0000011645659,0.0000024224762,0.0000052268974,0.0000029418075,0.9977139,0.000034191515,0.0021584092,0.000040885177,0.0000027215992],"about_ca_topic_score_codex":0.0079951435,"about_ca_topic_score_gemma":0.0063308356,"teacher_disagreement_score":0.0079951435,"about_ca_system_score_codex":0.001957492,"about_ca_system_score_gemma":0.0025498096,"threshold_uncertainty_score":0.022417784},"labels":[],"label_agreement":null},{"id":"W2114094150","doi":"10.5267/j.ijiec.2010.02.005","title":"A particle swarm approach to solve environmental/economic dispatch problem","year":2010,"lang":"en","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"Electric Power System Optimization","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Particle swarm optimization; Economic dispatch; Mathematical optimization; Computer science; Engineering; Mathematics; Physics; Electric power system","score_opus":0.01064840458373698,"score_gpt":0.2078199654378175,"score_spread":0.19717156085408052,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2114094150","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0033449573,0.00036794055,0.9905047,0.00026102466,0.0001307219,0.000049614402,0.000026583662,0.000076776836,0.005237665],"genre_scores_gemma":[0.2732706,0.0019544163,0.71382016,0.00022477595,0.00028468145,0.000381475,0.00023614238,0.000058627535,0.00976916],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997631,0.00007628037,0.000015693737,0.000036280217,0.00009059754,0.000018031576],"domain_scores_gemma":[0.99986553,0.000058946953,0.000014781314,0.000011252379,0.000039635055,0.0000097849115],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004563816,0.00068582036,0.00063474703,0.00045585373,0.0004485599,0.0005997939,0.00061223534,0.00094817084,0.0015067883],"category_scores_gemma":[0.00073719496,0.0002579159,0.0005687843,0.0006039554,0.00033719718,0.00071726413,0.00050500146,0.0009928897,0.0003542445],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036419868,0.00007719606,0.00057177414,0.00015899462,0.00009116788,0.00013752503,0.00008044946,0.8301241,0.0027550133,0.06320327,0.0047564832,0.09800769],"study_design_scores_gemma":[0.000020811614,0.000026916772,0.00011499202,0.0000075130456,0.000011302708,0.000029851546,0.000012055215,0.986179,0.00041353016,0.007672704,0.005505242,0.0000061543838],"about_ca_topic_score_codex":0.0030949602,"about_ca_topic_score_gemma":0.002214009,"teacher_disagreement_score":0.0030949602,"about_ca_system_score_codex":0.0003159832,"about_ca_system_score_gemma":0.0007250127,"threshold_uncertainty_score":0.006153941},"labels":[],"label_agreement":null},{"id":"W2114925916","doi":"10.1109/tpwrs.2007.907457","title":"Strategic Bidding for Price-Taker Hydroelectricity Producers","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"","keywords":"Bidding; Hydroelectricity; Electricity market; Electricity; Stochastic programming; Stochastic modelling; Stochastic process; Process (computing); Electricity generation; Electric power system; Operations research; Economics; Computer science; Industrial organization; Microeconomics; Mathematical optimization; Engineering; Power (physics); Finance; Mathematics; Electrical engineering","score_opus":0.016467329951924903,"score_gpt":0.2266777537310644,"score_spread":0.2102104237791395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2114925916","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23763728,0.00019568604,0.74904585,0.0009541712,0.000060217026,0.00012104299,0.00019047057,0.00023988169,0.011555396],"genre_scores_gemma":[0.98403084,0.0000857122,0.012454793,0.000052461866,0.000018328556,0.000046328532,0.000054487184,0.00002456389,0.003232646],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99843353,0.0009129802,0.000046498553,0.00018581212,0.0002283073,0.00019286113],"domain_scores_gemma":[0.9981146,0.0011287505,0.00037716466,0.00009644927,0.00013905953,0.0001440026],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002303161,0.0005370503,0.0010843229,0.00027147253,0.00040882712,0.0017439978,0.001546153,0.0011605904,0.0034211497],"category_scores_gemma":[0.0043347976,0.0008667152,0.0007110544,0.00045963854,0.00085549173,0.0020319682,0.0006887889,0.0011765363,0.00045723855],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012296865,0.00007374281,0.0012206157,0.000030876112,0.00003440297,0.00017552284,0.000064435786,0.94473624,0.0010373516,0.045164853,0.0007185264,0.0066204714],"study_design_scores_gemma":[0.000023526845,0.000050146296,0.00019234428,0.0000018708403,0.000007789067,0.00003748245,0.000021735546,0.9891939,0.00015857306,0.009944386,0.00035930634,0.0000088680345],"about_ca_topic_score_codex":0.0032589177,"about_ca_topic_score_gemma":0.005122769,"teacher_disagreement_score":0.0034211497,"about_ca_system_score_codex":0.0011718766,"about_ca_system_score_gemma":0.0015648946,"threshold_uncertainty_score":0.012180448},"labels":[],"label_agreement":null},{"id":"W2115304898","doi":"10.1109/psce.2009.4840058","title":"The effects of wind profile on thermal units generation costs","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Renewable energy; Power system simulation; Environmental science; Wind speed; Thermal power station; Electric power system; Electricity generation; Meteorology; Automotive engineering; Power (physics); Computer science; Marine engineering; Environmental economics; Engineering; Waste management; Electrical engineering","score_opus":0.004719399815469831,"score_gpt":0.18266876191103806,"score_spread":0.17794936209556822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2115304898","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99474156,0.00012389806,0.0020262527,0.00006892778,0.0000086695845,0.000021459637,0.00018736655,0.0000195133,0.0028023245],"genre_scores_gemma":[0.99927384,0.00006151135,0.0003017988,0.000009659782,0.000001344894,0.0000052833343,0.00004672241,0.0000072288417,0.00029268954],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943405,0.0002393848,0.0000351611,0.000039209637,0.00011939934,0.00013277344],"domain_scores_gemma":[0.99507624,0.003936811,0.00036377963,0.00017553911,0.0003353013,0.00011223056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010412382,0.00058207364,0.0005296976,0.0004391925,0.0004189572,0.0009146377,0.00043406265,0.0005243614,0.0017449405],"category_scores_gemma":[0.005118695,0.00038387944,0.00052221835,0.0008026677,0.0004263245,0.00092113524,0.0003611544,0.0005745397,0.00016237836],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00070711656,0.00011716439,0.01774201,0.00007206184,0.00007011876,0.0006276055,0.00003451789,0.96300197,0.0061273533,0.0010411578,0.00023682941,0.010222019],"study_design_scores_gemma":[0.00012376723,0.00196874,0.13943042,0.00004501285,0.0002918789,0.0005876594,0.00048527814,0.82646406,0.027575854,0.0021105856,0.0008061775,0.0001105177],"about_ca_topic_score_codex":0.0056839017,"about_ca_topic_score_gemma":0.008774152,"teacher_disagreement_score":0.0056839017,"about_ca_system_score_codex":0.00086050294,"about_ca_system_score_gemma":0.0004279173,"threshold_uncertainty_score":0.011301637},"labels":[],"label_agreement":null},{"id":"W2116191552","doi":"10.1145/2208828.2208846","title":"The impact of electricity pricing schemes on storage adoption in Ontario","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"University of Waterloo; Government of Ontario","keywords":"Electricity; Electricity pricing; Environmental economics; Business; Computer science; Industrial organization; Electricity market; Economics; Electrical engineering; Engineering","score_opus":0.009586884105588899,"score_gpt":0.22180232859153717,"score_spread":0.21221544448594828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116191552","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99069875,0.00007441887,0.00021138911,0.00055792765,0.0000036525284,0.00002726724,0.00046465712,0.000011751912,0.007950222],"genre_scores_gemma":[0.9983758,0.00006306971,0.00009914624,0.000023686038,0.0000015094239,0.0000048875404,0.0001410486,0.000002127111,0.0012887544],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9989819,0.0002074531,0.00003545298,0.00007230118,0.00026642636,0.00043641048],"domain_scores_gemma":[0.99639904,0.0012043632,0.0006989343,0.00018027695,0.001048427,0.00046887458],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071356754,0.00016834203,0.00023131493,0.00030377632,0.0009753932,0.0011451517,0.000795637,0.00044099326,0.0034806246],"category_scores_gemma":[0.0055579203,0.00016087544,0.00035174243,0.0013118396,0.00090226176,0.0006928771,0.0005502611,0.00037554384,0.00013055887],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020403077,0.0006578329,0.79733944,0.00016608169,0.00020463165,0.0014959747,0.0025499798,0.103158504,0.0072766417,0.025349874,0.010822336,0.04893841],"study_design_scores_gemma":[0.00020312048,0.00034243698,0.89022946,0.000034775876,0.000117251,0.00020459101,0.006544572,0.08819619,0.0020852417,0.0024657557,0.00949962,0.00007705189],"about_ca_topic_score_codex":0.9255684,"about_ca_topic_score_gemma":0.96278465,"teacher_disagreement_score":0.0744316,"about_ca_system_score_codex":0.023811819,"about_ca_system_score_gemma":0.009767761,"threshold_uncertainty_score":0.17276764},"labels":[],"label_agreement":null},{"id":"W2116212635","doi":"","title":"Integration of Wave and Tidal Power into the Haida Gwaii Electrical Grid","year":2009,"lang":"en","type":"dissertation","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Tidal power; Renewable energy; Marine energy; Engineering; Archipelago; Compressor station; Wave power; Environmental science; Marine engineering; Pipeline transport; Electrical engineering; Oceanography; Energy (signal processing); Environmental engineering; Geology","score_opus":0.004165579009522752,"score_gpt":0.20575901720953507,"score_spread":0.20159343820001233,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116212635","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5454171,0.0010567291,0.11316236,0.0025120329,0.00036979836,0.000534343,0.0012840418,0.0018129343,0.33385062],"genre_scores_gemma":[0.9485465,0.00062175427,0.017678117,0.00007372493,0.000027623073,0.000119041564,0.00059181254,0.00009830107,0.032243058],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99987125,0.000026285812,0.0000037230118,0.000022939621,0.00005597504,0.000019817726],"domain_scores_gemma":[0.99985564,0.00003436823,0.000012873406,0.000011367016,0.00005266522,0.000033059012],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002026072,0.0003875781,0.0002907981,0.0002611811,0.0005214966,0.0012981242,0.0003951252,0.00027477226,0.0037601301],"category_scores_gemma":[0.00044470985,0.00026620133,0.00022089072,0.0006408408,0.000264693,0.00049928896,0.0005402469,0.00069165824,0.0006584351],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028234432,0.00012425568,0.016793301,0.00015931787,0.00007001879,0.0006877023,0.0002660956,0.76603866,0.007860409,0.012647252,0.016016088,0.17905454],"study_design_scores_gemma":[0.000052305066,0.00012852284,0.011693505,0.000034858836,0.00005199641,0.000109896406,0.00045895294,0.9529337,0.002326454,0.0044479407,0.027733456,0.000028262464],"about_ca_topic_score_codex":0.072570264,"about_ca_topic_score_gemma":0.1576829,"teacher_disagreement_score":0.92742974,"about_ca_system_score_codex":0.0018302953,"about_ca_system_score_gemma":0.0025796574,"threshold_uncertainty_score":0.14429569},"labels":[],"label_agreement":null},{"id":"W2116385668","doi":"10.1109/ccece.2011.6030487","title":"Short-term coordination of hydro-thermal systems with cascaded reservoirs using bacterial foraging algorithm","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Foraging; Convergence (economics); Mathematical optimization; Computer science; Optimization problem; Term (time); Nonlinear system; Algorithm; Mathematics; Ecology","score_opus":0.021901769249127453,"score_gpt":0.21067961406677077,"score_spread":0.18877784481764331,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116385668","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07334418,0.0003162102,0.92133784,0.00016743965,0.000047783054,0.000074923446,0.00003108351,0.00019239976,0.004488156],"genre_scores_gemma":[0.8786063,0.00014504968,0.1183848,0.000034927813,0.000019724637,0.00015923435,0.00003589981,0.00002532969,0.0025886535],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998313,0.0000501814,0.000009011052,0.000030607625,0.00005491344,0.000023916828],"domain_scores_gemma":[0.99974483,0.00012740599,0.00004162436,0.00001683392,0.000040876337,0.000028424001],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004597948,0.0005777816,0.000858155,0.00024261931,0.00041543873,0.0004840407,0.00088890665,0.00079045066,0.00144435],"category_scores_gemma":[0.00080209697,0.00034472617,0.00044913747,0.00031937406,0.0004307529,0.0005322701,0.00061808276,0.00054375903,0.00012609633],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020914993,0.000009737336,0.00013246672,0.000012027147,0.0000093094,0.000026740761,0.000014392194,0.99082434,0.00086332374,0.0011878947,0.00013993397,0.00675898],"study_design_scores_gemma":[0.000005267692,0.00001314027,0.000028946128,0.000001040626,0.0000019236297,0.000003940717,0.0000017988295,0.9994758,0.00011991511,0.00024564163,0.00010116438,0.0000014988387],"about_ca_topic_score_codex":0.0058640623,"about_ca_topic_score_gemma":0.004166828,"teacher_disagreement_score":0.0058640623,"about_ca_system_score_codex":0.0005456983,"about_ca_system_score_gemma":0.0008871906,"threshold_uncertainty_score":0.011659861},"labels":[],"label_agreement":null},{"id":"W2116988740","doi":"10.1109/tpwrs.2009.2038783","title":"Long-Term Effects of Feed-In Tariffs and Carbon Taxes on Distribution Systems","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":64,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Renewable energy; Environmental economics; Investment (military); Context (archaeology); Electricity; Term (time); Distribution (mathematics); Carbon tax; Economics; Distributed generation; Feed-in tariff; Production (economics); Industrial organization; Emissions trading; Electricity generation; Microeconomics; Natural resource economics; Operations research; Energy policy; Power (physics); Engineering; Greenhouse gas; Electrical engineering; Mathematics","score_opus":0.003070718246184033,"score_gpt":0.18505268739152445,"score_spread":0.1819819691453404,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116988740","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97762376,0.0004604596,0.0035373801,0.0011691113,0.000033445947,0.0000660176,0.000916958,0.00007628072,0.016116591],"genre_scores_gemma":[0.9974312,0.00018553108,0.00026824162,0.000046738085,0.0000044423473,0.000011383011,0.000088559085,0.000006791527,0.0019570868],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988896,0.00044413697,0.000033839122,0.000061205705,0.0001466393,0.0004246359],"domain_scores_gemma":[0.9932766,0.0041031227,0.0013093011,0.00022510989,0.0007473076,0.00033857723],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002119606,0.0006658286,0.00047677147,0.00045935472,0.0009964496,0.0019150422,0.0011558898,0.0014174586,0.0042540175],"category_scores_gemma":[0.009535029,0.00041365824,0.0007162894,0.0007775731,0.001495718,0.0019200377,0.0008223683,0.0012784007,0.00021311625],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008760598,0.00025513815,0.01566265,0.00012956187,0.000107807304,0.00049550657,0.000096432086,0.9572246,0.0018449215,0.014957583,0.0014350797,0.0069146403],"study_design_scores_gemma":[0.00038804396,0.0012266538,0.06138287,0.00008225595,0.00047670674,0.00019604927,0.0014781953,0.9020982,0.007803573,0.019932067,0.0048106206,0.0001249161],"about_ca_topic_score_codex":0.24523957,"about_ca_topic_score_gemma":0.32938367,"teacher_disagreement_score":0.24523957,"about_ca_system_score_codex":0.01487936,"about_ca_system_score_gemma":0.0033110077,"threshold_uncertainty_score":0.48762423},"labels":[],"label_agreement":null},{"id":"W2117181535","doi":"10.1109/tpwrs.2004.825823","title":"Assessment of Transmission Congestion Cost and Locational Marginal Pricing in a Competitive Electricity Market","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":84,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Computer science; Electricity market; Transmission (telecommunications); Electric power transmission; Reliability (semiconductor); Transmission system; Marginal cost; Transmission network; Network topology; Power system simulation; Electric power system; Reliability engineering; Electricity; Network congestion; Computer network; Engineering; Power (physics); Telecommunications; Economics; Electrical engineering","score_opus":0.00631179647743849,"score_gpt":0.2235933090035715,"score_spread":0.217281512526133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2117181535","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.903686,0.00020616072,0.081233464,0.00030874,0.000024123776,0.00019772036,0.00035264727,0.000094910705,0.013896244],"genre_scores_gemma":[0.9948738,0.000041028088,0.0045092376,0.0000063216157,0.000008984998,0.000028308881,0.00006786228,0.000012530402,0.00045186092],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99837875,0.0008331652,0.000037620193,0.00010470224,0.00048305443,0.0001626449],"domain_scores_gemma":[0.9928195,0.005576682,0.0005117514,0.00022359342,0.0006387705,0.00022974478],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003089692,0.0008393148,0.00067939825,0.0018426498,0.00044302983,0.0021090927,0.0012541167,0.0010060972,0.002811665],"category_scores_gemma":[0.01306942,0.0005058795,0.0005237275,0.001459109,0.00095215184,0.0039012583,0.00096200674,0.000723877,0.00012525448],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025422833,0.00012924893,0.0076456796,0.000044563243,0.000053360047,0.00022237698,0.000052177777,0.9495582,0.0006218425,0.03105733,0.0004945367,0.009866405],"study_design_scores_gemma":[0.000011531686,0.000057732934,0.002342495,0.0000019947468,0.000009079292,0.0000284325,0.0000453804,0.9942345,0.00019252334,0.0029565576,0.00010907745,0.000010687119],"about_ca_topic_score_codex":0.016457869,"about_ca_topic_score_gemma":0.010562438,"teacher_disagreement_score":0.016457869,"about_ca_system_score_codex":0.0026694478,"about_ca_system_score_gemma":0.0015406015,"threshold_uncertainty_score":0.032724142},"labels":[],"label_agreement":null},{"id":"W2117858766","doi":"10.1109/pes.2006.1708872","title":"Line impact cost concept to calculate congestion costs in deregulated electricity market","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Electricity; Line (geometry); Network congestion; Computer science; Schedule; Reliability engineering; Operations research; Computer network; Engineering; Electrical engineering; Mathematics","score_opus":0.0036012330662299114,"score_gpt":0.21029790073907406,"score_spread":0.20669666767284414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2117858766","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06536823,0.00080013333,0.9227753,0.00014285298,0.00011915114,0.00014064656,0.00023930217,0.0003968309,0.010017661],"genre_scores_gemma":[0.8688143,0.00060325424,0.12611501,0.00006609104,0.00008124911,0.00019119972,0.0003722975,0.00013603707,0.003620596],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920005,0.00023277468,0.000023071212,0.000048310954,0.00042946145,0.00006639711],"domain_scores_gemma":[0.99894685,0.0005431293,0.000106901025,0.000091217815,0.000278103,0.000033786437],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009840633,0.00081445434,0.00039866526,0.0017935452,0.0002510247,0.0008395584,0.0011484941,0.00041558628,0.0034214032],"category_scores_gemma":[0.0038927845,0.000215515,0.00042156907,0.0022268584,0.00037784336,0.002030442,0.00045856024,0.0007441233,0.0003834343],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054369786,0.00004712642,0.0011757797,0.00004002406,0.000030647825,0.000055784378,0.000019902165,0.92630816,0.0010476878,0.026756834,0.0010733249,0.043390278],"study_design_scores_gemma":[0.000005905768,0.000029830708,0.00092764286,0.000005108453,0.000007773446,0.000033771496,0.0000078715975,0.99257976,0.0010786717,0.0038959563,0.0014177136,0.000010092517],"about_ca_topic_score_codex":0.0032080074,"about_ca_topic_score_gemma":0.0022512034,"teacher_disagreement_score":0.0034214032,"about_ca_system_score_codex":0.0013623417,"about_ca_system_score_gemma":0.00052240054,"threshold_uncertainty_score":0.011445701},"labels":[],"label_agreement":null},{"id":"W2118094951","doi":"10.1109/tec.2004.827043","title":"Accounting for Losses in the Optimization of Production of Hydroplants","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Electric Power System Optimization","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; Hydro-Québec; HEC Montréal","funders":"","keywords":"Dynamic programming; Variable (mathematics); Mathematical optimization; Unit (ring theory); Production (economics); Computer science; Optimization problem; Head (geology); Mathematics; Economics","score_opus":0.007282511942764788,"score_gpt":0.19282638136688013,"score_spread":0.18554386942411533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2118094951","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07888481,0.00043056786,0.9128281,0.00033588524,0.0000424521,0.000053732747,0.00013795927,0.00028644362,0.0069999895],"genre_scores_gemma":[0.94177043,0.00058558077,0.05055341,0.00005369859,0.000031912146,0.00008468762,0.00013063817,0.00018928314,0.00660037],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969566,0.000097762866,0.000008144222,0.000045631234,0.0000974488,0.0000554318],"domain_scores_gemma":[0.9996345,0.00022905371,0.000049042403,0.0000270533,0.000036710433,0.000023526562],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059517694,0.0010006049,0.0007831346,0.00031744462,0.000420813,0.0011919525,0.0008656576,0.00067094364,0.0021148026],"category_scores_gemma":[0.0015875152,0.00064101367,0.00048504095,0.00050730474,0.0006585732,0.0020537172,0.0007068446,0.001158628,0.0002490088],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012561627,0.000008211361,0.0001090506,0.00001345796,0.0000037373256,0.000021891265,0.000007099879,0.99104977,0.00045409336,0.0019653789,0.000119377975,0.006235441],"study_design_scores_gemma":[0.000003869398,0.000013222349,0.00013329083,0.000003084465,0.000004851624,0.000009400581,0.000009687838,0.9941023,0.0006690607,0.0046722866,0.00037505126,0.0000038650915],"about_ca_topic_score_codex":0.0053054746,"about_ca_topic_score_gemma":0.0053611803,"teacher_disagreement_score":0.0053054746,"about_ca_system_score_codex":0.0009821234,"about_ca_system_score_gemma":0.0013027677,"threshold_uncertainty_score":0.010549188},"labels":[],"label_agreement":null},{"id":"W2119471982","doi":"10.1109/pes.2004.1373027","title":"Coordinated spot market for congestion management of inter-regional electricity markets","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; University of Waterloo","funders":"","keywords":"Congestion management; Electricity market; Electricity; Spot market; Forward contract; Spot contract; Industrial organization; Power market; Point (geometry); Electric power system; Electricity system; Computer science; Business; Electricity generation; Power (physics); Engineering; Finance; Electrical engineering","score_opus":0.00604614523891169,"score_gpt":0.20349858922293274,"score_spread":0.19745244398402104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2119471982","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06881669,0.00040252504,0.91934717,0.0003642738,0.00012029694,0.00008307826,0.0000930601,0.00031195095,0.010461043],"genre_scores_gemma":[0.9675702,0.00022286933,0.026260389,0.00003167251,0.00007955985,0.00007678674,0.00006742421,0.000040339084,0.005650795],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995808,0.00019175197,0.000011726689,0.00007032988,0.000091590744,0.000053864787],"domain_scores_gemma":[0.9995623,0.000193065,0.000053490512,0.000037390324,0.00010422786,0.00004942777],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000897942,0.00040808882,0.0009951404,0.00027329114,0.00032322164,0.0008603499,0.0006856171,0.0004917976,0.008344834],"category_scores_gemma":[0.0012413225,0.00018256894,0.0003609966,0.0003502457,0.0005187846,0.0010988556,0.00059653656,0.0005164913,0.00029601017],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001865553,0.000057801448,0.0003224389,0.00008421482,0.000051120198,0.00012873279,0.000046594592,0.86887115,0.0029737526,0.080840796,0.0045929775,0.04184386],"study_design_scores_gemma":[0.000030347592,0.00005457188,0.00010190694,0.000002061612,0.000012159852,0.000014300887,0.000008977097,0.9868499,0.00034478487,0.011580003,0.0009970266,0.0000039732695],"about_ca_topic_score_codex":0.0017694202,"about_ca_topic_score_gemma":0.0020453942,"teacher_disagreement_score":0.008344834,"about_ca_system_score_codex":0.000608909,"about_ca_system_score_gemma":0.0008480319,"threshold_uncertainty_score":0.027916253},"labels":[],"label_agreement":null},{"id":"W2119673178","doi":"10.1177/1035304615574973","title":"The privatisation of Australian electricity: Claims, myths and facts","year":2015,"lang":"en","type":"article","venue":"The Economic and Labour Relations Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Australian Government","keywords":"Liberalization; Government (linguistics); Electricity; Quarter (Canadian coin); Market economy; Investment (military); Business; Economics; Project commissioning; Private sector; Mythology; Value (mathematics); Finance; Commerce; Publishing; Economic growth; Politics; Law; Engineering","score_opus":0.016428095138306547,"score_gpt":0.22981892461498896,"score_spread":0.21339082947668242,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2119673178","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.083463885,0.14008202,0.001987869,0.6590048,0.0026015155,0.000021193582,0.00009943511,0.00001876967,0.11272048],"genre_scores_gemma":[0.80891865,0.118145466,0.0006824154,0.046860814,0.0034664604,0.000031701336,0.00004554782,0.000018319228,0.021830577],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9958533,0.0014151222,0.000204497,0.00030300705,0.0019071992,0.0003168904],"domain_scores_gemma":[0.9852064,0.009837613,0.0015463489,0.00067892217,0.0024451562,0.00028567927],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008135422,0.00013616144,0.000352761,0.00083455053,0.0017950176,0.003764187,0.00081893726,0.0030064387,0.0022170446],"category_scores_gemma":[0.014917318,0.00020379233,0.00027176362,0.0014665402,0.009521415,0.0038245234,0.0018906533,0.0066312333,0.00032062732],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012346239,0.00010611805,0.0024613303,0.0014881382,0.000052255433,0.000682932,0.018955057,0.0010045973,0.00085742754,0.7969356,0.07085751,0.106475584],"study_design_scores_gemma":[0.000021112155,0.000163343,0.01244631,0.0045574866,0.00004121565,0.0006440499,0.016623205,0.0014292913,0.0009817521,0.1804477,0.7825648,0.000079765465],"about_ca_topic_score_codex":0.015105387,"about_ca_topic_score_gemma":0.008885659,"teacher_disagreement_score":0.015105387,"about_ca_system_score_codex":0.0036294505,"about_ca_system_score_gemma":0.0031099175,"threshold_uncertainty_score":0.04302472},"labels":[],"label_agreement":null},{"id":"W2119993630","doi":"10.1109/eem.2012.6254753","title":"Fast computation of equilibrium market outcomes considering tacit collusion","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Tacit collusion; Collusion; Bidding; Computer science; Microeconomics; Game theory; Industrial organization; Electricity market; Electricity; Mathematical optimization; Economics; Mathematics; Engineering","score_opus":0.00969238638884459,"score_gpt":0.2178872437483683,"score_spread":0.2081948573595237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2119993630","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.104835324,0.000055047636,0.8910344,0.00010616225,0.000014482393,0.00007796964,0.000043539658,0.0004342163,0.0033988159],"genre_scores_gemma":[0.80685085,0.000057693163,0.19145489,0.000029843257,0.000012605953,0.0001702765,0.000101926445,0.00007357369,0.0012483847],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995912,0.00012589595,0.000018851995,0.00005789129,0.00011296816,0.00009326912],"domain_scores_gemma":[0.99614596,0.0027542226,0.00034577676,0.0002630704,0.00034347907,0.00014749849],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013089709,0.0007894213,0.0012369509,0.0008094037,0.00070271466,0.0011240751,0.0012278272,0.0012903499,0.00431932],"category_scores_gemma":[0.008653741,0.00055626675,0.00060162914,0.0005343589,0.00086747203,0.0013138746,0.0017719253,0.0010395126,0.0005297649],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008630995,0.00004373842,0.00092532707,0.00003942907,0.000023727947,0.00011566014,0.00012248693,0.96368587,0.0010493858,0.014772547,0.00023502368,0.018900571],"study_design_scores_gemma":[0.0000076250826,0.000009531054,0.00004708628,0.0000018711105,0.0000017194592,0.000008287114,0.000010505378,0.9959359,0.00020177232,0.003720309,0.00005344543,0.0000018749724],"about_ca_topic_score_codex":0.0049853604,"about_ca_topic_score_gemma":0.0049083326,"teacher_disagreement_score":0.0049853604,"about_ca_system_score_codex":0.00087158533,"about_ca_system_score_gemma":0.001649421,"threshold_uncertainty_score":0.014449537},"labels":[],"label_agreement":null},{"id":"W2120835375","doi":"10.1109/pes.2007.385565","title":"Investigation of Transmission Cost Allocation Using a Power Flow Tracing Method","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Tracing; Computer science; Transmission (telecommunications); Scheme (mathematics); Cost allocation; Power flow; Mathematical optimization; Power (physics); Electric power system; Telecommunications; Economics","score_opus":0.012864463807926966,"score_gpt":0.24018716476842278,"score_spread":0.2273227009604958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2120835375","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024083693,0.00016435441,0.9724371,0.000110673886,0.000022295535,0.00006338627,0.000019824045,0.00009089523,0.0030078858],"genre_scores_gemma":[0.73175627,0.0005209818,0.26344493,0.000052316005,0.000037542413,0.00013373357,0.00004242287,0.00007388597,0.0039379606],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940634,0.0003424078,0.000016723956,0.000046376106,0.00015198093,0.000036189605],"domain_scores_gemma":[0.99784446,0.0016986842,0.00015174689,0.00010508544,0.00016423578,0.000035747995],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019345491,0.00064311194,0.000681893,0.0008719541,0.0003610842,0.0008218729,0.0011259296,0.0010964678,0.002405608],"category_scores_gemma":[0.005894177,0.0003636849,0.0005641954,0.0009989238,0.00071949733,0.0017222795,0.00046983987,0.00096476125,0.00012879755],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039504455,0.000074268064,0.0005781739,0.00006381764,0.000019126952,0.00008850718,0.00007192825,0.92629313,0.0023119876,0.041826133,0.00033114475,0.028302204],"study_design_scores_gemma":[0.0000030449628,0.000007971007,0.000044596934,0.0000027296794,0.0000019422694,0.000006858102,0.0000032475218,0.9983903,0.00015935798,0.001216083,0.00016192989,0.0000020705952],"about_ca_topic_score_codex":0.006559254,"about_ca_topic_score_gemma":0.0025592064,"teacher_disagreement_score":0.006559254,"about_ca_system_score_codex":0.0009773737,"about_ca_system_score_gemma":0.0010267397,"threshold_uncertainty_score":0.013042152},"labels":[],"label_agreement":null},{"id":"W2121608062","doi":"10.1109/pesmg.2013.6672443","title":"Security-constrained unit commitment with uncertain wind generation: The loadability set approach","year":2013,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Mathematical optimization; Set (abstract data type); Economic dispatch; Electric power system; Software deployment; Computer science; Wind power; Reliability (semiconductor); Power (physics); Engineering; Mathematics","score_opus":0.018346238992647482,"score_gpt":0.20404297002092156,"score_spread":0.18569673102827408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2121608062","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009062851,0.000679943,0.97606057,0.00055809953,0.00012921034,0.00006190552,0.00020131227,0.00015283967,0.013093246],"genre_scores_gemma":[0.8043814,0.0019536242,0.17984934,0.00021976545,0.00029888639,0.00033374378,0.0005498414,0.00026132012,0.012152074],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99948347,0.0002722025,0.000017276892,0.000061874,0.00012908594,0.00003606567],"domain_scores_gemma":[0.9992642,0.0004846039,0.000067441,0.0000598737,0.000090495436,0.0000334344],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000954522,0.001027089,0.0009378966,0.00039306845,0.00033053284,0.00092487765,0.001058573,0.0006428595,0.010713945],"category_scores_gemma":[0.002534617,0.0003565428,0.00054278865,0.0011021596,0.0005975315,0.0011039939,0.00080736895,0.0014057002,0.0008584048],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025570986,0.0000082987235,0.00009934389,0.000046257835,0.00001863008,0.00005555018,0.0000109261655,0.95578843,0.00020027543,0.024098985,0.00156633,0.018081382],"study_design_scores_gemma":[0.0000039179454,0.000008182319,0.00002989419,0.000008311711,0.0000036229817,0.000009645699,0.0000040274685,0.98600775,0.00012207401,0.012802708,0.0009963339,0.000003498258],"about_ca_topic_score_codex":0.004037447,"about_ca_topic_score_gemma":0.0030486407,"teacher_disagreement_score":0.010713945,"about_ca_system_score_codex":0.00078765885,"about_ca_system_score_gemma":0.0008452587,"threshold_uncertainty_score":0.035841703},"labels":[],"label_agreement":null},{"id":"W2122051472","doi":"10.5267/j.ijiec.2011.08.0013","title":"Energy market and reserve market modeling in simultaneous and serial implementation methods with the aim of reducing electricity costs","year":2011,"lang":"en","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity market; Electricity; Environmental economics; Economics; Business; Natural resource economics; Industrial organization; Microeconomics; Computer science; Engineering; Electrical engineering","score_opus":0.02610183908415872,"score_gpt":0.27454089517092556,"score_spread":0.24843905608676684,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122051472","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051990535,0.00006836027,0.9419426,0.000107395346,0.000030211033,0.00005918645,0.000030317304,0.00020321037,0.0055682566],"genre_scores_gemma":[0.7385748,0.00011957489,0.25010222,0.00006273201,0.00004182114,0.00020659664,0.00006292974,0.00012732008,0.010701929],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99953747,0.0002150688,0.00001771989,0.000060030914,0.000118186974,0.000051516185],"domain_scores_gemma":[0.9992423,0.00042031784,0.00010649463,0.00007732819,0.00011707954,0.00003646836],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011599372,0.000650094,0.00056304334,0.0003420038,0.0002734517,0.00090085564,0.0010635351,0.0006914829,0.004371336],"category_scores_gemma":[0.0019888615,0.0004705,0.00088568375,0.00040231628,0.0005882958,0.0017420182,0.0006056871,0.00087349745,0.00035422793],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007743881,0.00009680757,0.0005064018,0.000027833768,0.000022280567,0.000042436124,0.000041854943,0.964919,0.0012427735,0.01759025,0.00036856718,0.015064324],"study_design_scores_gemma":[0.0000065479608,0.000019698558,0.000036982558,8.419836e-7,0.0000025791937,0.0000065691643,0.0000029738446,0.9984712,0.0002018358,0.0010611673,0.00018772375,0.0000018716993],"about_ca_topic_score_codex":0.004258848,"about_ca_topic_score_gemma":0.004343559,"teacher_disagreement_score":0.004371336,"about_ca_system_score_codex":0.00044576413,"about_ca_system_score_gemma":0.0008124769,"threshold_uncertainty_score":0.014623582},"labels":[],"label_agreement":null},{"id":"W2122492517","doi":"10.1109/pes.2007.386176","title":"Analysis of Network Rental in the Competitive Electricity Market","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Natural Sciences and Engineering Research Council of Canada; Manitoba Hydro","keywords":"Renting; Karush–Kuhn–Tucker conditions; Electricity; Electricity market; Revenue; Constraint (computer-aided design); Electricity generation; Computer science; Mathematical optimization; Microeconomics; Business; Operations research; Industrial organization; Power (physics); Economics; Engineering; Finance; Mathematics","score_opus":0.003938496507501248,"score_gpt":0.19923848082025267,"score_spread":0.19529998431275142,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122492517","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45287636,0.0029161777,0.3719727,0.0029639264,0.0001614927,0.0002477933,0.00053629297,0.00019840221,0.16812685],"genre_scores_gemma":[0.98333734,0.0005794344,0.00672566,0.00006315964,0.00006395262,0.000064053034,0.000063173145,0.000047892318,0.009055277],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993211,0.00027498274,0.000019917936,0.00006397276,0.00017609655,0.00014400695],"domain_scores_gemma":[0.9986021,0.00084398704,0.0001944405,0.00007176722,0.00017903613,0.00010874977],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012613072,0.0005877903,0.00077816605,0.00081698986,0.0007187768,0.0020335538,0.0012750365,0.0010490483,0.008902818],"category_scores_gemma":[0.005169796,0.00050123996,0.0008819578,0.00077620905,0.001675822,0.0036146736,0.000948268,0.0011308905,0.00043387423],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000095811265,0.0000635984,0.001498681,0.00011267846,0.000035596284,0.00052078423,0.00013350803,0.39971673,0.0014238855,0.58624035,0.0023958588,0.0077625266],"study_design_scores_gemma":[0.000011470545,0.000024599702,0.0009269225,0.000010594861,0.000010622643,0.000108288456,0.0000765357,0.9508924,0.00013727286,0.04675703,0.0010251127,0.000019130954],"about_ca_topic_score_codex":0.007992424,"about_ca_topic_score_gemma":0.0057045654,"teacher_disagreement_score":0.008902818,"about_ca_system_score_codex":0.0028571154,"about_ca_system_score_gemma":0.0012792655,"threshold_uncertainty_score":0.029782891},"labels":[],"label_agreement":null},{"id":"W2122597238","doi":"10.1109/tpwrs.2009.2036264","title":"A Stochastic Programming Model for a Day-Ahead Electricity Market With Real-Time Reserve Shortage Pricing","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Mathematical optimization; Electricity pricing; Electricity; Scheduling (production processes); Electricity market; Computation; Computer science; Power system simulation; Economic shortage; Integer programming; Stochastic programming; Heuristic; Time limit; Electric power system; Limit (mathematics); Operations research; Economics; Power (physics); Engineering; Mathematics; Algorithm","score_opus":0.007904079102977066,"score_gpt":0.21270874033599127,"score_spread":0.20480466123301422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122597238","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013927402,0.00028680568,0.9772499,0.00084600976,0.00008408438,0.000078350226,0.0006656588,0.00019629044,0.006665529],"genre_scores_gemma":[0.8009849,0.0010804229,0.17434715,0.0003851964,0.00019926578,0.0007729992,0.0009952843,0.00014944898,0.021085255],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99908507,0.00041819215,0.000031889944,0.00016896507,0.00017403142,0.000121845784],"domain_scores_gemma":[0.9990897,0.0005561168,0.00014575521,0.000028522643,0.00009225653,0.00008759273],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015078103,0.0013911923,0.0013675186,0.0005537001,0.00050277694,0.0019277591,0.0021741963,0.0022495387,0.0059857066],"category_scores_gemma":[0.002246931,0.00082266144,0.0012845619,0.0011872884,0.00090154423,0.0015780644,0.0009307581,0.0021989408,0.00078874227],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026355016,0.000021751506,0.00008562887,0.00002742088,0.000016441762,0.000077424695,0.000014108924,0.9635726,0.0002658026,0.033469457,0.0006720193,0.0017508991],"study_design_scores_gemma":[0.00000988597,0.000012132197,0.000032009415,0.0000020594866,0.00000368512,0.000011088236,0.0000034954157,0.9930114,0.00004064764,0.006493062,0.00037481124,0.000005697113],"about_ca_topic_score_codex":0.006837911,"about_ca_topic_score_gemma":0.0070677362,"teacher_disagreement_score":0.006837911,"about_ca_system_score_codex":0.001375255,"about_ca_system_score_gemma":0.0017512678,"threshold_uncertainty_score":0.02002418},"labels":[],"label_agreement":null},{"id":"W2122940896","doi":"","title":"Market Power in the Wholesale Electricity Spot Market in Alberta, Canada","year":2003,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity market; Restructuring; Market power; Electricity; Spot market; Electricity retailing; Wholesale market; Business; Competition (biology); Spot contract; Electric power industry; Industrial organization; Market economy; Factor market; Commerce; Economics; Finance; Engineering; Electrical engineering","score_opus":0.002661747326040394,"score_gpt":0.16210992224137422,"score_spread":0.15944817491533383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122940896","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97606635,0.0006294758,0.00045461408,0.00076794124,0.000009937519,0.000020267702,0.0011766158,0.000023597317,0.020851262],"genre_scores_gemma":[0.9953483,0.00027040063,0.00013813177,0.00003199854,0.000003897889,0.0000026732705,0.000516799,0.0000046069613,0.0036831608],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99943596,0.000037786773,0.0000123971495,0.000050799867,0.00025662285,0.00020641928],"domain_scores_gemma":[0.9989292,0.00025149118,0.00015126636,0.000022398945,0.00048953545,0.00015613329],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004868683,0.00024015305,0.00035277428,0.0014094186,0.0016709818,0.002355427,0.00074654643,0.00035132386,0.003620698],"category_scores_gemma":[0.0022978464,0.00017127389,0.000280688,0.0033418967,0.0009919612,0.0006347631,0.00046371104,0.00042103912,0.00020287378],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012077938,0.00029441342,0.713372,0.00030089178,0.00027601852,0.003345494,0.006817372,0.085569695,0.0036398552,0.06559503,0.029944945,0.08963656],"study_design_scores_gemma":[0.00010309054,0.000054070908,0.9185571,0.000051790237,0.00007284104,0.00014824551,0.009165387,0.05006463,0.000894208,0.0035351203,0.017256014,0.000097522476],"about_ca_topic_score_codex":0.9945015,"about_ca_topic_score_gemma":0.9969914,"teacher_disagreement_score":0.02866368,"about_ca_system_score_codex":0.02866368,"about_ca_system_score_gemma":0.019028021,"threshold_uncertainty_score":0.2079705},"labels":[],"label_agreement":null},{"id":"W2124055265","doi":"10.1109/naps.2008.5307337","title":"Mathematical modeling and simulation of the impact of system's constraints on IPP's bidding strategies","year":2008,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Cournot competition; Bidding; Price elasticity of demand; Mathematical optimization; Computer science; Elasticity (physics); Simulation software; Software; Software package; Economics; Mathematical economics; Microeconomics; Mathematics","score_opus":0.018674553485942585,"score_gpt":0.2480584446034974,"score_spread":0.22938389111755483,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124055265","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4760765,0.00038271424,0.45323157,0.0007005472,0.00008254861,0.00020612714,0.00082783465,0.0004568532,0.06803523],"genre_scores_gemma":[0.98132807,0.0001811923,0.014284475,0.000033072425,0.000010183851,0.00014288997,0.000112903086,0.000028973023,0.003878232],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973744,0.000102330865,0.00001152013,0.000026443073,0.00006141266,0.000060850598],"domain_scores_gemma":[0.9989963,0.00061173463,0.00014402372,0.0000591057,0.00014417572,0.000044662364],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005799444,0.0005184885,0.00070854457,0.0004262745,0.00042750163,0.0009999955,0.0008624364,0.00090225233,0.004987144],"category_scores_gemma":[0.0017132735,0.00039788274,0.00055059325,0.000604188,0.0006020519,0.00086638215,0.00038074364,0.000681715,0.00030081588],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011306052,0.000009843987,0.00013824849,0.000008822544,0.000004135426,0.00002571559,0.000007989059,0.99537367,0.0002087731,0.0036448524,0.00007282585,0.0004937721],"study_design_scores_gemma":[0.000005999255,0.000010387039,0.00006051676,0.0000011922316,0.0000031291163,0.0000041298194,0.0000036530676,0.99911064,0.00009789145,0.00057541183,0.00012540583,0.0000016326735],"about_ca_topic_score_codex":0.013088525,"about_ca_topic_score_gemma":0.0069028707,"teacher_disagreement_score":0.013088525,"about_ca_system_score_codex":0.0009810985,"about_ca_system_score_gemma":0.0012935855,"threshold_uncertainty_score":0.0260247},"labels":[],"label_agreement":null},{"id":"W2124928332","doi":"10.1109/ccece.2007.326","title":"The Investor's Dilemma: Generation or Transmission Expansion?","year":2007,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Consejo Nacional de Ciencia y Tecnología","keywords":"Dilemma; Reactance; Investment (military); Electric power transmission; Electricity market; Transmission (telecommunications); Incentive; Power transmission; Transmission line; Electricity; Economics; Industrial organization; Work (physics); Business; Microeconomics; Computer science; Power (physics); Telecommunications; Engineering; Electrical engineering; Voltage; Mathematics; Mechanical engineering","score_opus":0.01490662129200323,"score_gpt":0.22283180901917632,"score_spread":0.20792518772717308,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124928332","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41749313,0.0044578123,0.1744571,0.12838288,0.0008201591,0.00016215297,0.00019904644,0.000087551576,0.27394012],"genre_scores_gemma":[0.98380625,0.0010873848,0.0051424387,0.0018271552,0.00022900675,0.00004495035,0.000011818474,0.0000100637535,0.007840913],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989704,0.0005913413,0.00002528231,0.00012151572,0.00012979544,0.00016165616],"domain_scores_gemma":[0.99772173,0.0015214605,0.00032303372,0.00010969705,0.000093656134,0.00023041572],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003259923,0.00040178583,0.000736165,0.00028231036,0.0006290274,0.0019912224,0.00080689514,0.0038197723,0.0052644117],"category_scores_gemma":[0.0063992837,0.00019410133,0.0003773576,0.00023854604,0.0036087793,0.0054261456,0.0011585779,0.0017279644,0.00029687895],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018665049,0.000068501424,0.00088469905,0.00007302447,0.00003739213,0.00083266664,0.00041930727,0.018650342,0.00073726854,0.960407,0.004053695,0.013649451],"study_design_scores_gemma":[0.00018706943,0.000108123335,0.000489471,0.00008475205,0.000023015342,0.0007532948,0.00058433565,0.053944625,0.00042272615,0.93185496,0.011516932,0.000030772477],"about_ca_topic_score_codex":0.00054084865,"about_ca_topic_score_gemma":0.0004104154,"teacher_disagreement_score":0.0052644117,"about_ca_system_score_codex":0.0008210384,"about_ca_system_score_gemma":0.00078550086,"threshold_uncertainty_score":0.017611206},"labels":[],"label_agreement":null},{"id":"W2124937476","doi":"10.1109/tpwrs.2007.901482","title":"Generalized Estimation of Average Displaced Emissions by Wind Generation","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Renewable energy; Wind power; Environmental economics; Electricity generation; Electric power system; Greenhouse gas; Work (physics); Estimation; Engineering; Environmental science; Computer science; Power (physics); Economics; Systems engineering; Electrical engineering","score_opus":0.008066432887448313,"score_gpt":0.22102131133006067,"score_spread":0.21295487844261235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124937476","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12149158,0.00017403172,0.876953,0.000034367586,0.00001361773,0.000026303993,0.00021376503,0.00028024087,0.00081309763],"genre_scores_gemma":[0.8345189,0.00028394331,0.16349003,0.000026813454,0.000023278651,0.00008332352,0.0005828631,0.0000763933,0.00091449695],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99950314,0.00022218973,0.000021769725,0.000112693946,0.00010550575,0.000034769742],"domain_scores_gemma":[0.9993292,0.00035079612,0.00010850117,0.00012930084,0.00006833366,0.000013846584],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007885735,0.00066029956,0.00072082155,0.00065641163,0.00013504723,0.0004744224,0.00082588615,0.00035692554,0.00057195127],"category_scores_gemma":[0.0034296692,0.00028867525,0.00059912226,0.000698431,0.00030447973,0.00072434585,0.0006642621,0.00046506606,0.00009983736],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041802294,0.00001400482,0.0033161899,0.00004762844,0.00011785646,0.000056967314,0.000034111858,0.95355386,0.0027110165,0.0046680155,0.000182318,0.035256222],"study_design_scores_gemma":[0.0000055273463,0.00003589026,0.0043118885,0.000008121327,0.00001777695,0.000028570199,0.000016012085,0.9873124,0.0016656248,0.0060111876,0.0005667065,0.000020385629],"about_ca_topic_score_codex":0.0059067947,"about_ca_topic_score_gemma":0.00780463,"teacher_disagreement_score":0.0059067947,"about_ca_system_score_codex":0.0003529687,"about_ca_system_score_gemma":0.000510988,"threshold_uncertainty_score":0.011744797},"labels":[],"label_agreement":null},{"id":"W2126017276","doi":"10.1109/ccece.1997.614847","title":"A method for optimal pricing of electric supply including transmission system considerations","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University; Technical University of Nova Scotia","funders":"","keywords":"Electricity pricing; Computer science; Electricity; Electric power transmission; Bundle; Mathematical optimization; Electricity market; Transmission (telecommunications); Electric power system; Power (physics); Engineering; Telecommunications; Electrical engineering; Mathematics","score_opus":0.021183180624534,"score_gpt":0.24764845866978374,"score_spread":0.22646527804524974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2126017276","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0004340363,0.00006989272,0.99696356,0.000055527802,0.000038919563,0.000030758794,0.000012987033,0.00005405889,0.0023402502],"genre_scores_gemma":[0.08963168,0.00057432405,0.9013084,0.00011017202,0.00020521495,0.0003102527,0.00007817703,0.00021212676,0.0075695263],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921954,0.00030732804,0.000024598052,0.00007388277,0.00033294514,0.000041611136],"domain_scores_gemma":[0.99938595,0.0003894742,0.00004295477,0.00004150633,0.00012355404,0.000016523845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013867704,0.0011655893,0.001298377,0.0011080845,0.0005775674,0.0015474875,0.0012837028,0.0013713529,0.007945696],"category_scores_gemma":[0.003484686,0.00072600786,0.0011135394,0.0012520261,0.0007430826,0.0017515636,0.0007268407,0.0015833412,0.0013140055],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044741693,0.00006473821,0.00026099157,0.00016030733,0.000052877713,0.00009914553,0.00007223957,0.658835,0.0020189236,0.19138457,0.0048406087,0.14216588],"study_design_scores_gemma":[0.000015665984,0.000026237867,0.00005621361,0.00001696707,0.000010159888,0.000048525384,0.000009121485,0.95712095,0.00043551796,0.036635045,0.005613636,0.000012047011],"about_ca_topic_score_codex":0.0026611062,"about_ca_topic_score_gemma":0.0032546658,"teacher_disagreement_score":0.007945696,"about_ca_system_score_codex":0.0011180637,"about_ca_system_score_gemma":0.0016681143,"threshold_uncertainty_score":0.02658099},"labels":[],"label_agreement":null},{"id":"W2126251090","doi":"10.1109/ccece.2011.6030486","title":"Short-term hydro-thermal scheduling with environmental considerations using bacterial foraging algorithm","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Foraging; Mathematical optimization; Computer science; Scheduling (production processes); Optimization problem; Minification; Job shop scheduling; Convergence (economics); Multi-objective optimization; Mathematics; Schedule; Ecology","score_opus":0.017698729458394392,"score_gpt":0.1935833131142354,"score_spread":0.175884583655841,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2126251090","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.052037995,0.0005328816,0.9412817,0.00022240423,0.00004610527,0.000062083804,0.000039475137,0.0001830737,0.005594277],"genre_scores_gemma":[0.7332528,0.00042989498,0.26227936,0.000068323396,0.000038131995,0.0002525289,0.00009292327,0.0000544068,0.0035316283],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999811,0.00007285143,0.0000075920093,0.000020333146,0.00006548458,0.000022745628],"domain_scores_gemma":[0.9997415,0.00014281408,0.000033900134,0.000013352059,0.00004841737,0.000020057201],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050214166,0.0006246096,0.00084406626,0.0003142213,0.00035204052,0.00045745788,0.0005888029,0.00074945606,0.0012098788],"category_scores_gemma":[0.0009362855,0.00032000252,0.0004742725,0.00037376498,0.00033482176,0.00051872333,0.000488936,0.0004539856,0.00016205739],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020289574,0.000013620918,0.00016374973,0.000018338862,0.000013669432,0.000017530117,0.000013618763,0.9867443,0.00074271305,0.0018274739,0.00017956694,0.010245203],"study_design_scores_gemma":[0.000007733856,0.000015360074,0.000049160346,0.0000028253585,0.0000032673122,0.000004979016,0.000003700754,0.9986461,0.00012214771,0.00085954816,0.00028326784,0.0000018986768],"about_ca_topic_score_codex":0.0042122947,"about_ca_topic_score_gemma":0.0032455425,"teacher_disagreement_score":0.0042122947,"about_ca_system_score_codex":0.00050003215,"about_ca_system_score_gemma":0.0010226351,"threshold_uncertainty_score":0.0083755255},"labels":[],"label_agreement":null},{"id":"W2126615038","doi":"10.1002/we.1942","title":"Variability in large‐scale wind power generation","year":2015,"lang":"en","type":"article","venue":"Wind Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":58,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Offshore wind power; Wind power; Environmental science; Meteorology; Wind speed; Climatology; Geography; Engineering; Geology","score_opus":0.00888771309757743,"score_gpt":0.1932813254565777,"score_spread":0.18439361235900026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2126615038","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99445516,0.00006637152,0.0042598317,0.000031051448,0.000008302642,0.0000054968923,0.0005095901,0.000039415772,0.00062479434],"genre_scores_gemma":[0.99946314,0.000012403365,0.0001835132,0.0000017858945,0.00000338648,0.0000015617368,0.00029045102,0.0000026422622,0.000041213185],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996797,0.00007321809,0.000030374676,0.000101669546,0.00008220426,0.000032853066],"domain_scores_gemma":[0.9984024,0.00081325613,0.0003616382,0.0001702374,0.00018365563,0.000068817426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00072688435,0.00017308754,0.0002412942,0.00056578347,0.00011950749,0.000529031,0.0002119282,0.00022066652,0.0005411854],"category_scores_gemma":[0.0030318392,0.00012764338,0.00020923471,0.0008618314,0.0001713474,0.000429042,0.00021656409,0.0002480841,0.00010583631],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047056543,0.000112066286,0.601193,0.000105136074,0.00038840776,0.0011554369,0.0002635572,0.3511144,0.009201493,0.0016707394,0.0015135782,0.032811657],"study_design_scores_gemma":[0.000013445971,0.00007355859,0.7526617,0.000014607341,0.000027727821,0.00032112256,0.00012699196,0.24330965,0.0012579545,0.0011575554,0.0010080215,0.000027650449],"about_ca_topic_score_codex":0.001978163,"about_ca_topic_score_gemma":0.0020734773,"teacher_disagreement_score":0.001978163,"about_ca_system_score_codex":0.00024079964,"about_ca_system_score_gemma":0.000079116384,"threshold_uncertainty_score":0.0039333105},"labels":[],"label_agreement":null},{"id":"W2127664368","doi":"10.1109/tpwrs.2007.894867","title":"Pricing Energy and Reserves Using Stochastic Optimization in an Alternative Electricity Market","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":141,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"Independent Electricity System Operator","keywords":"Activity-based costing; Electricity market; Electric power system; Linear programming; Energy market; Stochastic programming; Electricity; Electricity pricing; Computer science; Profit (economics); Mathematical optimization; Contingency; Operations research; Economics; Microeconomics; Engineering; Electrical engineering; Mathematics; Power (physics)","score_opus":0.01221753262752926,"score_gpt":0.2313100404976195,"score_spread":0.21909250787009024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127664368","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1451679,0.00037280918,0.8343208,0.0014941351,0.00008273874,0.00010091102,0.00036160104,0.0002197159,0.017879345],"genre_scores_gemma":[0.97127175,0.00023365681,0.022379404,0.000096855394,0.000055300075,0.00010429021,0.000098193734,0.000030532003,0.005729997],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986027,0.000762896,0.00003906882,0.00011318261,0.0003388806,0.0001433409],"domain_scores_gemma":[0.9988427,0.00074463815,0.00018220492,0.000044154527,0.000104517996,0.00008179447],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001868545,0.0008262269,0.0012586873,0.0005119079,0.00044870639,0.0020114828,0.0011684836,0.0014283635,0.002398437],"category_scores_gemma":[0.0030911493,0.00066627417,0.0008611965,0.00081660657,0.0013878973,0.0018970681,0.0008838856,0.0011122782,0.00020491779],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002611355,0.000015159282,0.00008164591,0.0000074255872,0.000008450223,0.000030772335,0.000008999978,0.97183007,0.00011629561,0.026596073,0.00016816842,0.0011108028],"study_design_scores_gemma":[0.000006806011,0.000007647235,0.000023130053,8.310211e-7,0.0000015638857,0.0000036440965,0.0000024332235,0.9951953,0.000019781522,0.004641104,0.000094812596,0.0000028856139],"about_ca_topic_score_codex":0.010138869,"about_ca_topic_score_gemma":0.010335481,"teacher_disagreement_score":0.010138869,"about_ca_system_score_codex":0.002324696,"about_ca_system_score_gemma":0.0017560207,"threshold_uncertainty_score":0.020159721},"labels":[],"label_agreement":null},{"id":"W2127971672","doi":"10.1109/mper.2001.4311153","title":"Energetic Operation Planning Using Genetic Algorithms","year":2001,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Generality; Computer science; Mathematical optimization; Genetic algorithm; Convergence (economics); Parallelism (grammar); Electric power system; Class (philosophy); Nonlinear programming; Adaptation (eye); Nonlinear system; Optimization problem; Cascade; Algorithm; Power (physics); Artificial intelligence; Mathematics; Machine learning; Engineering; Parallel computing","score_opus":0.014647809033862149,"score_gpt":0.24093081076050066,"score_spread":0.2262830017266385,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127971672","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016801294,0.0006786077,0.96884805,0.00023850468,0.000040301555,0.00007620008,0.000043020005,0.00024499104,0.0130290575],"genre_scores_gemma":[0.64342225,0.0017357569,0.34806395,0.00008966045,0.00005925854,0.00032182765,0.00013899083,0.000105546125,0.006062704],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997898,0.000080698475,0.000008513721,0.00003201834,0.000067308654,0.000021706073],"domain_scores_gemma":[0.9997447,0.00015075364,0.00003424912,0.000019502264,0.0000405775,0.000010328987],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005736481,0.000786397,0.00067545107,0.00095426885,0.00038528212,0.0011220216,0.00066764915,0.00082354934,0.0017718754],"category_scores_gemma":[0.0013251076,0.00041550546,0.00050500967,0.0009936161,0.00071517687,0.00067520776,0.00050456263,0.00054609554,0.00037573738],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005828588,0.000006892334,0.00009341897,0.000010723175,0.000008668485,0.000015224114,0.000009386196,0.97979695,0.00020201642,0.0058257906,0.0001767957,0.013848231],"study_design_scores_gemma":[0.0000073724814,0.000011761983,0.000049780985,0.000007270686,0.0000047217454,0.000006830516,0.0000061572255,0.99115163,0.0001920049,0.0077405698,0.000817996,0.0000038040291],"about_ca_topic_score_codex":0.004924814,"about_ca_topic_score_gemma":0.0053454153,"teacher_disagreement_score":0.004924814,"about_ca_system_score_codex":0.0008405997,"about_ca_system_score_gemma":0.0010284833,"threshold_uncertainty_score":0.009792268},"labels":[],"label_agreement":null},{"id":"W2128378447","doi":"10.1109/pes.2007.385504","title":"Secondary Reserve Dispatch Accounting for Wind Power Randomness and Spillage","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Reserve requirement; Spillage; Bidding; Electric power system; Computer science; Scheduling (production processes); Probabilistic logic; Reliability engineering; Operations research; Power system simulation; Randomness; Power (physics); Engineering; Electrical engineering; Operations management; Business; Economics; Mathematics","score_opus":0.0043725682953713735,"score_gpt":0.2033347062928229,"score_spread":0.19896213799745155,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2128378447","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.070343785,0.00016989818,0.92281014,0.0002914447,0.0001265684,0.000074392236,0.000220795,0.00042394843,0.005539041],"genre_scores_gemma":[0.9538693,0.00010408772,0.042498115,0.0000395915,0.00012214293,0.00004726121,0.00013977432,0.00011629467,0.0030634294],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896395,0.0003895842,0.00006527914,0.00015616404,0.0002785505,0.00014653808],"domain_scores_gemma":[0.99718803,0.0011709072,0.00045659792,0.0004752132,0.00045978752,0.00024948234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015837528,0.0011245308,0.0019170147,0.00048179898,0.00041994444,0.0014917097,0.0014843796,0.00054200384,0.0031564042],"category_scores_gemma":[0.0040983954,0.00043784082,0.0008661588,0.0006351307,0.0005237827,0.0014840128,0.00090459635,0.0012701543,0.00048649],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025110377,0.00003554995,0.00039306912,0.00004886567,0.000031810905,0.00011404271,0.00003476534,0.95678186,0.0033406906,0.020408204,0.0011535505,0.017406477],"study_design_scores_gemma":[0.000013512533,0.00003730912,0.0001373823,0.0000024510177,0.0000075847684,0.000016043256,0.00000343742,0.99426705,0.000553018,0.004618416,0.00033766084,0.000006117102],"about_ca_topic_score_codex":0.00271242,"about_ca_topic_score_gemma":0.0042063664,"teacher_disagreement_score":0.0031564042,"about_ca_system_score_codex":0.000850774,"about_ca_system_score_gemma":0.0015594556,"threshold_uncertainty_score":0.010559201},"labels":[],"label_agreement":null},{"id":"W2128889856","doi":"10.1109/pes.2009.5275925","title":"Training T&amp;#x00026;D's next generation for next generation networks: The CIGRE experience","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Alberta Energy","funders":"","keywords":"Next-generation network; Government (linguistics); Investment (military); Order (exchange); Business; Telecommunications; Computer science; Engineering; Finance; Politics; Political science","score_opus":0.11537010572180338,"score_gpt":0.26791067272380314,"score_spread":0.15254056700199975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2128889856","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07033049,0.007623153,0.0070820646,0.11730787,0.003519801,0.000111027235,0.000194763,0.00067194673,0.793159],"genre_scores_gemma":[0.32487938,0.01864479,0.009344371,0.017423877,0.0016884379,0.00007992591,0.00038749757,0.0005564414,0.6269953],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989706,0.00032103952,0.00003155691,0.00009130318,0.0003241406,0.00026131712],"domain_scores_gemma":[0.9980794,0.00051051355,0.000061942366,0.00013913236,0.00048802668,0.0007208781],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002585948,0.00032067503,0.0001497013,0.00048295953,0.0021811365,0.0024171926,0.0009663822,0.002655338,0.020290334],"category_scores_gemma":[0.0018391616,0.0002191763,0.00019603268,0.00045158778,0.0012136094,0.001646603,0.0016666576,0.0019246588,0.007523655],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009372352,0.0006682301,0.0077746715,0.00019785904,0.000009098383,0.002942318,0.005762018,0.0015744242,0.0028600148,0.023598602,0.65641576,0.29810333],"study_design_scores_gemma":[0.000008626485,0.00013273642,0.0034533697,0.00011343677,0.0000037088892,0.0009901442,0.0039096964,0.00045644402,0.0011987672,0.0009617806,0.9887511,0.000020135643],"about_ca_topic_score_codex":0.01246608,"about_ca_topic_score_gemma":0.04133716,"teacher_disagreement_score":0.020290334,"about_ca_system_score_codex":0.0014118563,"about_ca_system_score_gemma":0.0018892032,"threshold_uncertainty_score":0.06787795},"labels":[],"label_agreement":null},{"id":"W2129281754","doi":"10.1016/j.eneco.2009.05.007","title":"A ‘simple’ hybrid model for power derivatives","year":2009,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Randomness; Markov chain; Simple (philosophy); Mathematical optimization; Black–Scholes model; Markov process; Electricity; Computer science; Spot contract; Supply and demand; Econometrics; Economics; Mathematics; Microeconomics; Volatility (finance); Financial economics; Futures contract","score_opus":0.007408280484817648,"score_gpt":0.18755272050676436,"score_spread":0.1801444400219467,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2129281754","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033505224,0.00036544338,0.923932,0.00089793967,0.00025032336,0.000059677994,0.00053865416,0.00058699533,0.039863635],"genre_scores_gemma":[0.8611718,0.00035057793,0.09383548,0.00030452438,0.0001697146,0.00018143239,0.00044206865,0.0002504562,0.04329404],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998486,0.00004809313,0.000007512821,0.000028335899,0.000051022664,0.0000164296],"domain_scores_gemma":[0.99977106,0.000094093346,0.00001781658,0.0000397394,0.000053621257,0.000023783128],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003075313,0.00043322516,0.00077152037,0.0002970896,0.00038225125,0.0011600422,0.001500692,0.0017444454,0.009303914],"category_scores_gemma":[0.0010108728,0.0004273822,0.00073022355,0.00053471833,0.0005793419,0.0018986976,0.00077064155,0.0012295417,0.0012127206],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003591592,0.00003374625,0.00021545503,0.000041105413,0.000027931306,0.000101278594,0.000027674116,0.9357893,0.0016377938,0.050887305,0.0019716236,0.009230933],"study_design_scores_gemma":[0.000010721471,0.00000826887,0.000074141586,0.0000021077108,0.0000041959943,0.000018725435,0.0000027071023,0.9882874,0.00017465837,0.009646748,0.0017635961,0.000006758968],"about_ca_topic_score_codex":0.004360825,"about_ca_topic_score_gemma":0.0036790557,"teacher_disagreement_score":0.009303914,"about_ca_system_score_codex":0.00052987353,"about_ca_system_score_gemma":0.0005712261,"threshold_uncertainty_score":0.031124711},"labels":[],"label_agreement":null},{"id":"W2129823301","doi":"10.1109/pes.2008.4596558","title":"Environmental and economic analysis of Ontario&amp;#x2019;s Standard Offer Program for small power producers","year":2008,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Renewable energy; Investment (military); Environmental economics; Context (archaeology); Production (economics); Economic analysis; Distributed generation; Business; Generator (circuit theory); Electricity generation; Return on investment; Power (physics); Finance; Economics; Engineering; Electrical engineering; Microeconomics; Agricultural economics; Political science","score_opus":0.008942897412165703,"score_gpt":0.19195367470721394,"score_spread":0.18301077729504825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2129823301","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91109705,0.0001912558,0.0013963805,0.0013538909,0.000012893211,0.00014852305,0.0021085069,0.000027951854,0.083663605],"genre_scores_gemma":[0.9834789,0.00015465402,0.00047926995,0.000035725447,0.0000053007534,0.000028390821,0.0005081008,0.0000073623155,0.015302211],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99955064,0.00008329873,0.0000061381247,0.000023373193,0.00016741571,0.00016908023],"domain_scores_gemma":[0.9993364,0.00019279636,0.000077950055,0.000025459181,0.000253434,0.0001140229],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005407396,0.00014062459,0.00016908429,0.00035267806,0.00094516954,0.0010410969,0.00041021843,0.00029444098,0.0057224254],"category_scores_gemma":[0.0015737968,0.00015009694,0.0002967986,0.00072497735,0.00060687744,0.0004055243,0.00030342521,0.00032421446,0.000114833354],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019098788,0.00081597693,0.17646258,0.00030906286,0.00015525767,0.0017594587,0.0011985485,0.50908476,0.0054659047,0.19352086,0.049060043,0.060257714],"study_design_scores_gemma":[0.0003659403,0.00060003303,0.55828387,0.00008049036,0.00021354332,0.00016168809,0.0046966188,0.34976012,0.0028444177,0.015622651,0.06725944,0.00011117208],"about_ca_topic_score_codex":0.9220028,"about_ca_topic_score_gemma":0.96847165,"teacher_disagreement_score":0.07799721,"about_ca_system_score_codex":0.026744166,"about_ca_system_score_gemma":0.013204431,"threshold_uncertainty_score":0.1940434},"labels":[],"label_agreement":null},{"id":"W2130126778","doi":"10.1109/tpwrs.2003.821443","title":"Unit Commitment With Dual Variable Constraints","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Unit (ring theory); Electricity market; Dual (grammatical number); Electricity; Margin (machine learning); Variable (mathematics); Economic dispatch; Economics; Computer science; Microeconomics; Production (economics); Operations research; Unit price; Marginal cost; Mathematical optimization; Electric power system; Power (physics); Engineering; Mathematics","score_opus":0.008631209271090732,"score_gpt":0.1925792035961298,"score_spread":0.18394799432503905,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2130126778","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003805256,0.00046781506,0.9828127,0.0005692679,0.00017530924,0.000061063794,0.00019805117,0.0001071789,0.011803371],"genre_scores_gemma":[0.5948675,0.0019928548,0.34463382,0.00071734557,0.00041835895,0.0007318453,0.0005901892,0.00024991506,0.055798087],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99890864,0.0005322487,0.000035646062,0.00018863384,0.00021928996,0.00011547826],"domain_scores_gemma":[0.99938345,0.00025617587,0.00007286543,0.00010552289,0.00011694675,0.00006494384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012330636,0.0010729837,0.0014146677,0.00046274095,0.00041344436,0.0025045457,0.002456545,0.0018035423,0.00809803],"category_scores_gemma":[0.0018944172,0.00067884556,0.0011065297,0.0016137079,0.0008513113,0.0022118967,0.0016453759,0.003702337,0.0014604151],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006601015,0.00005309926,0.00013105369,0.00010053527,0.000059026042,0.00015806752,0.000042640822,0.7903547,0.0008305202,0.18279724,0.004534257,0.02087274],"study_design_scores_gemma":[0.000024841105,0.00003132469,0.000027895105,0.000010655108,0.000010042727,0.00004653241,0.000009261971,0.96595776,0.00020642557,0.029146016,0.0045185657,0.000010698352],"about_ca_topic_score_codex":0.0018663709,"about_ca_topic_score_gemma":0.002237866,"teacher_disagreement_score":0.00809803,"about_ca_system_score_codex":0.0011763771,"about_ca_system_score_gemma":0.001334678,"threshold_uncertainty_score":0.02709061},"labels":[],"label_agreement":null},{"id":"W2130809507","doi":"","title":"Assessing the benefits of wind power curtailment in a hydro-dominated power system","year":2009,"lang":"en","type":"article","venue":"2009 CIGRE/IEEE PES Joint Symposium Integration of Wide-Scale Renewable Resources Into the Power Delivery System","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Wind power; Electric power system; Variable (mathematics); Reliability engineering; Power grid; Power (physics); Grid; Engineering; Operations research; Environmental economics; Environmental science; Economics; Electrical engineering; Geography; Mathematics","score_opus":0.007449038513740531,"score_gpt":0.20981489602530154,"score_spread":0.202365857511561,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2130809507","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9879396,0.00012825221,0.008344191,0.00022032716,0.0000120271425,0.000059924467,0.00008184745,0.00002204885,0.0031917181],"genre_scores_gemma":[0.9985827,0.000045768433,0.0010236134,0.000011970888,0.0000051647603,0.0000073168826,0.000020198206,0.000002872057,0.00030029943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995403,0.00027440276,0.000017293405,0.00003551843,0.00007694513,0.000055578483],"domain_scores_gemma":[0.9987122,0.0009095154,0.00012267042,0.00003663238,0.00011288884,0.00010616765],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013088599,0.00069490954,0.0005803151,0.0005059528,0.00036006962,0.00083874795,0.00039955406,0.000839136,0.0012128836],"category_scores_gemma":[0.0038397014,0.00035119947,0.0003081917,0.0004800148,0.0004339526,0.0013750638,0.0005578628,0.0005765389,0.00008296008],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00061465095,0.00020335263,0.011297488,0.000067901354,0.000110945795,0.00033440007,0.000030748157,0.97119987,0.0028098845,0.0025849652,0.00022995344,0.010515755],"study_design_scores_gemma":[0.00008010062,0.00084793137,0.017369585,0.000012338529,0.000080675134,0.00005677726,0.00012785145,0.9758799,0.0017788089,0.0034369007,0.000308362,0.000020825843],"about_ca_topic_score_codex":0.005180841,"about_ca_topic_score_gemma":0.007948692,"teacher_disagreement_score":0.005180841,"about_ca_system_score_codex":0.0010323668,"about_ca_system_score_gemma":0.00064875,"threshold_uncertainty_score":0.010301352},"labels":[],"label_agreement":null},{"id":"W2133886886","doi":"10.1109/tpwrs.2002.800909","title":"Network-constrained multiperiod auction for a pool-based electricity market","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":156,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Electricity market; Computer science; Electricity; Scheduling (production processes); Power system simulation; Operations research; Flexibility (engineering); Industrial organization; Operator (biology); Microeconomics; Transparency (behavior); Mathematical optimization; Economics; Electric power system; Operations management; Engineering; Power (physics); Computer security","score_opus":0.011132055854155129,"score_gpt":0.19126979284515416,"score_spread":0.18013773699099903,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2133886886","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.052466422,0.00019640516,0.9328583,0.00025961208,0.000050163973,0.00014836372,0.0001667815,0.00012718765,0.01372665],"genre_scores_gemma":[0.8859684,0.00018560872,0.106188826,0.00007120034,0.000025624448,0.00026018405,0.00010964239,0.00008112117,0.007109456],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902964,0.00054471573,0.000035608038,0.00009109757,0.00017029805,0.00012865022],"domain_scores_gemma":[0.9987232,0.00081270945,0.000133955,0.000094011404,0.0001326637,0.000103441744],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031693878,0.0007433752,0.0012170115,0.00048705557,0.0007097218,0.0019015707,0.0014471993,0.0010929873,0.0065874746],"category_scores_gemma":[0.004531995,0.00064032734,0.00082985015,0.00076782634,0.0010245816,0.0027619135,0.0012012521,0.0011405336,0.00048534106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000101629914,0.000035565696,0.0001419909,0.00003938566,0.00001938254,0.00014590129,0.000036971716,0.9147527,0.00067638035,0.0796825,0.0005537046,0.0038138488],"study_design_scores_gemma":[0.000023056598,0.000020951871,0.00004202563,0.0000020895907,0.000004592448,0.00001873702,0.0000074734703,0.9882427,0.00010473809,0.011128725,0.00039936948,0.000005588378],"about_ca_topic_score_codex":0.003830156,"about_ca_topic_score_gemma":0.0032583894,"teacher_disagreement_score":0.0065874746,"about_ca_system_score_codex":0.0014001289,"about_ca_system_score_gemma":0.0017034765,"threshold_uncertainty_score":0.022037327},"labels":[],"label_agreement":null},{"id":"W2134064228","doi":"10.1109/ccece.1999.808226","title":"Rotating power cuts in Alberta-the past and the future","year":2003,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Deregulation; Electricity; Duration (music); Power (physics); Engineering; Electrical engineering; Economics; Market economy; Physics","score_opus":0.0019054551963623107,"score_gpt":0.1651378173813256,"score_spread":0.1632323621849633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2134064228","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5972672,0.040524643,0.004455243,0.12737146,0.0013625523,0.00006204314,0.0044895452,0.0003431791,0.22412424],"genre_scores_gemma":[0.95085096,0.015721407,0.001712115,0.004138321,0.00016349094,0.0000059731133,0.001300613,0.000035074812,0.026072053],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9988815,0.000052562904,0.000023578401,0.000080930375,0.0004746392,0.00048678918],"domain_scores_gemma":[0.9985481,0.000078227866,0.0002185935,0.000036743142,0.0007690259,0.00034939806],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009089858,0.00027773425,0.00025923905,0.0010355188,0.0033310477,0.0047580553,0.0014124393,0.0013141505,0.0053355927],"category_scores_gemma":[0.0014291758,0.00018256233,0.00020628808,0.003573114,0.0024195206,0.0009797026,0.00074935326,0.0017141855,0.00030252716],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007133239,0.0002953186,0.14597292,0.0007408664,0.00008034274,0.003492295,0.0048831524,0.031296786,0.0036642193,0.21250145,0.16039069,0.43596867],"study_design_scores_gemma":[0.000038523467,0.00014475336,0.3831112,0.0006189998,0.000065851564,0.00079787616,0.023918899,0.0065435055,0.0016593183,0.016706215,0.5662066,0.00018829969],"about_ca_topic_score_codex":0.9678326,"about_ca_topic_score_gemma":0.98952776,"teacher_disagreement_score":0.051058084,"about_ca_system_score_codex":0.051058084,"about_ca_system_score_gemma":0.041554026,"threshold_uncertainty_score":0.37045407},"labels":[],"label_agreement":null},{"id":"W2134704122","doi":"10.1109/tpwrs.2006.888956","title":"A Model for Efficient Consumer Pricing Schemes in Electricity Markets","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":132,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Complementarity (molecular biology); Electricity market; Marginal cost; Economics; Microeconomics; Electricity pricing; Electricity retailing; Variable pricing; Ex-ante; Industrial organization; Welfare; Business; Market economy","score_opus":0.011983649339828605,"score_gpt":0.22736286847161183,"score_spread":0.21537921913178323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2134704122","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039932374,0.0004347204,0.8740883,0.003979367,0.00012960238,0.00027463635,0.0015400039,0.000488363,0.07913268],"genre_scores_gemma":[0.8297647,0.00076475285,0.085412964,0.0004969894,0.00015916514,0.000841916,0.0007074997,0.0001777423,0.08167422],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896324,0.000385346,0.000042652304,0.0002044971,0.00020262395,0.00020175682],"domain_scores_gemma":[0.998809,0.0006712262,0.00013949203,0.00009882744,0.00017635428,0.00010510599],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014176806,0.00092454895,0.001078899,0.0006855449,0.0010917011,0.0036469433,0.0028584145,0.0046282546,0.021700451],"category_scores_gemma":[0.004978942,0.0008097031,0.0012090672,0.001466916,0.0016183648,0.004369085,0.0016014056,0.0027855784,0.0024098724],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053165993,0.000049943872,0.00024330882,0.000043696546,0.000018111568,0.00017416473,0.00011448479,0.29895666,0.0003984363,0.69171137,0.0034158514,0.0048207464],"study_design_scores_gemma":[0.00006783575,0.000028869808,0.00009454065,0.000011889642,0.000009814854,0.00007289396,0.00003723496,0.8448958,0.00009301176,0.14874752,0.0059258705,0.000014728223],"about_ca_topic_score_codex":0.010855461,"about_ca_topic_score_gemma":0.0072396216,"teacher_disagreement_score":0.021700451,"about_ca_system_score_codex":0.0030916915,"about_ca_system_score_gemma":0.0025049746,"threshold_uncertainty_score":0.07259524},"labels":[],"label_agreement":null},{"id":"W2135084663","doi":"10.1109/naps.2008.5307304","title":"Transmission planning in deregulated markets considering GenCos' strategic behavior","year":2008,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Electricity market; Computer science; Operator (biology); Transmission (telecommunications); Simulated annealing; Competition (biology); Transmission system; Electricity; Operations research; Mathematical optimization; Industrial organization; Telecommunications; Business; Engineering; Electrical engineering","score_opus":0.02631107345652174,"score_gpt":0.22367362133465615,"score_spread":0.1973625478781344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135084663","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1548229,0.00030653572,0.83727133,0.00025015473,0.000025131912,0.00007969565,0.00006613829,0.00010279447,0.0070752674],"genre_scores_gemma":[0.9446487,0.00022003338,0.0529039,0.00003535854,0.000012834549,0.00007375222,0.000043133332,0.000027635888,0.0020346567],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957794,0.00026819823,0.000008979074,0.000051038925,0.000049765975,0.000044105014],"domain_scores_gemma":[0.9995092,0.00032216427,0.00007032162,0.000014749198,0.000054361855,0.000029195146],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009990922,0.00066604663,0.00082038535,0.00031532868,0.00036804035,0.00091008603,0.00077184435,0.0006710642,0.0014612366],"category_scores_gemma":[0.0011127425,0.0005349684,0.00044807358,0.00046254141,0.00056983484,0.000994994,0.00043741282,0.00057674287,0.00012481988],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000850502,0.000006029863,0.000093248214,0.0000063851885,0.0000068217264,0.00003623643,0.0000107739215,0.9957151,0.0001531167,0.0022886125,0.000038900234,0.0016362966],"study_design_scores_gemma":[0.0000039951487,0.000011312039,0.000032367665,0.0000012566569,0.0000029377354,0.0000057216125,0.000007951252,0.99840456,0.00007138446,0.0013786609,0.0000781259,0.0000016802383],"about_ca_topic_score_codex":0.005872257,"about_ca_topic_score_gemma":0.009533741,"teacher_disagreement_score":0.005872257,"about_ca_system_score_codex":0.0009103527,"about_ca_system_score_gemma":0.0013242698,"threshold_uncertainty_score":0.011676133},"labels":[],"label_agreement":null},{"id":"W2135395455","doi":"10.1109/tpwrs.2002.800947","title":"Equilibrium of auction markets with unit commitment: the need for augmented pricing","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":77,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Profit (economics); Microeconomics; Computer science; Scope (computer science); Unit (ring theory); Competition (biology); Economics; Work (physics); Market power; Mathematical economics; Electric power system; Operations research; Mathematical optimization; Power (physics); Engineering; Mathematics","score_opus":0.01453428199598955,"score_gpt":0.19806629931967523,"score_spread":0.18353201732368568,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135395455","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022377206,0.0002805241,0.9656565,0.00089357217,0.000053126623,0.00005177572,0.000041671057,0.000088144814,0.010557485],"genre_scores_gemma":[0.76782787,0.00074413494,0.22298051,0.0002664838,0.00016687189,0.00031847862,0.00010920987,0.00014168487,0.0074447533],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99772495,0.0014390143,0.00008013496,0.00025763223,0.00030258775,0.00019570247],"domain_scores_gemma":[0.99396485,0.0042018676,0.0005360327,0.0005768558,0.00043027732,0.00029020145],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003966944,0.0007357923,0.002302406,0.00056719186,0.0009313156,0.0036129428,0.0022535042,0.0019563055,0.0063928445],"category_scores_gemma":[0.018374385,0.00075490907,0.0010083867,0.0009538312,0.002507973,0.0074555883,0.0026116264,0.003399692,0.00066568266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004647397,0.000041345884,0.00018155602,0.00006891832,0.000020524814,0.000078843994,0.00010628233,0.13273667,0.00034580045,0.85547155,0.0006659143,0.010236192],"study_design_scores_gemma":[0.000024951862,0.00002583812,0.000043660977,0.000018327493,0.0000047661574,0.000020707746,0.00003795188,0.42148936,0.00015467223,0.5771578,0.0010104399,0.000011531018],"about_ca_topic_score_codex":0.0014444318,"about_ca_topic_score_gemma":0.0013229356,"teacher_disagreement_score":0.0063928445,"about_ca_system_score_codex":0.001032897,"about_ca_system_score_gemma":0.0016768426,"threshold_uncertainty_score":0.021386147},"labels":[],"label_agreement":null},{"id":"W2139030509","doi":"10.1287/opre.1040.0117","title":"Valuation and Optimal Operation of Electric Power Plants in Competitive Markets","year":2004,"lang":"en","type":"article","venue":"Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":102,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University; Queen's University","funders":"","keywords":"Hydroelectricity; Valuation (finance); Electricity; Spot contract; Computer science; Nonlinear system; Thermal power station; Mathematical optimization; Electricity market; Mean reversion; Economics; Econometrics; Mathematics; Futures contract; Engineering; Electrical engineering","score_opus":0.02460379229547448,"score_gpt":0.3068818606813805,"score_spread":0.282278068385906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2139030509","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12533292,0.00014300804,0.8658581,0.00045958863,0.000023283634,0.000121924,0.0001252667,0.00020188882,0.0077340323],"genre_scores_gemma":[0.7714437,0.0001241983,0.22489564,0.000057703728,0.000018714176,0.00019473505,0.00017062307,0.00006240362,0.0030322736],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997032,0.00012452723,0.000013641203,0.00004460957,0.000059637696,0.000054399166],"domain_scores_gemma":[0.9990145,0.0007093601,0.00009202842,0.000038871523,0.00008751232,0.000057662673],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013157299,0.0006153009,0.00095664704,0.00052966777,0.0005198155,0.0014382525,0.0011639827,0.0014932717,0.0036628349],"category_scores_gemma":[0.004269728,0.00066804717,0.0005362028,0.00052577246,0.0009425136,0.0016568556,0.0010161932,0.0009382626,0.00031667532],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038709764,0.000020050787,0.0004089383,0.000018055598,0.000009498439,0.00006092899,0.000050187213,0.9703001,0.0002676068,0.01894357,0.00030076108,0.009581692],"study_design_scores_gemma":[0.000012008363,0.00000867514,0.000032753625,0.000002715411,0.0000014901703,0.0000067140827,0.000010139113,0.99254096,0.00011719897,0.0071047293,0.00016036336,0.0000022628901],"about_ca_topic_score_codex":0.00531555,"about_ca_topic_score_gemma":0.004288385,"teacher_disagreement_score":0.00531555,"about_ca_system_score_codex":0.0014382813,"about_ca_system_score_gemma":0.0014408024,"threshold_uncertainty_score":0.012253344},"labels":[],"label_agreement":null},{"id":"W2140745986","doi":"10.1109/pct.2007.4538440","title":"Effect of Risk Measures on Bilateral Trading in Electricity Markets","year":2007,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Negotiation; Regret; Outcome (game theory); Profit (economics); Electricity; Microeconomics; Actuarial science; Business; Economics; Computer science; Engineering","score_opus":0.0037386579867071863,"score_gpt":0.20465472975681373,"score_spread":0.20091607177010654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2140745986","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82568955,0.00075921597,0.16019526,0.00047429622,0.00008249905,0.0003729901,0.000054545184,0.00025981732,0.012111752],"genre_scores_gemma":[0.9833499,0.00006667391,0.016099637,0.000022055963,0.000009301572,0.000057888526,0.000010205613,0.0000134703305,0.0003708466],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9812843,0.013307965,0.00075521116,0.0005283874,0.0034029356,0.00072122016],"domain_scores_gemma":[0.8651692,0.118077874,0.0091441,0.004398976,0.0018176901,0.0013921994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.024681505,0.001390646,0.0010451449,0.0011035342,0.00070536317,0.0026520465,0.000992939,0.0011776828,0.0024451355],"category_scores_gemma":[0.07648917,0.000346529,0.0010539382,0.0006313256,0.002770851,0.0041490975,0.0037674266,0.0016387227,0.00016529509],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.005227359,0.0011225799,0.013759057,0.00037271224,0.00034088644,0.0004994295,0.0007195132,0.7725316,0.008656065,0.10454637,0.00041763252,0.09180682],"study_design_scores_gemma":[0.00041462385,0.0043672915,0.0039590015,0.00008063778,0.00015808226,0.00030183807,0.00033493995,0.9245169,0.009164652,0.055721387,0.0008788317,0.0001017667],"about_ca_topic_score_codex":0.0004172205,"about_ca_topic_score_gemma":0.00029852288,"teacher_disagreement_score":0.024681505,"about_ca_system_score_codex":0.0014856799,"about_ca_system_score_gemma":0.0008939017,"threshold_uncertainty_score":0.13052988},"labels":[],"label_agreement":null},{"id":"W2140919703","doi":"10.1109/pes.2003.1267219","title":"A power system assessment tool for the deregulated electricity market","year":2004,"lang":"en","type":"article","venue":"2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro One (Canada); HydraTek (Canada)","funders":"","keywords":"Activity-based costing; Electricity market; Reliability engineering; Reliability (semiconductor); Electricity; Computer science; Electric power system; Software; Maximum power transfer theorem; Electric power industry; Operations research; Power (physics); Engineering; Electrical engineering; Business","score_opus":0.004068287912081899,"score_gpt":0.20017087517521884,"score_spread":0.19610258726313695,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2140919703","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01676597,0.00009723733,0.9275551,0.00012290239,0.000041257736,0.00024462256,0.0035451122,0.035661332,0.015966453],"genre_scores_gemma":[0.2902693,0.00030466367,0.6855931,0.0000848264,0.00004428463,0.0009789411,0.005008038,0.0041645467,0.013552347],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99974483,0.00008356923,0.000018687264,0.00003070306,0.00010628412,0.00001586615],"domain_scores_gemma":[0.99905926,0.000552254,0.00007113712,0.000091500275,0.00019343213,0.000032455737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009530145,0.0010316063,0.0005595701,0.00123927,0.0003873607,0.00090283883,0.0009296201,0.00052010163,0.03248322],"category_scores_gemma":[0.0027014422,0.000520267,0.00051522464,0.0009977701,0.00016480753,0.0014806702,0.00070897647,0.00078200403,0.0036109898],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017299908,0.00017565538,0.003581279,0.00044202522,0.00010583151,0.00042420402,0.00028780292,0.6493074,0.00765816,0.041415107,0.048811454,0.24761796],"study_design_scores_gemma":[0.00004977478,0.000032826007,0.00045907253,0.000025848243,0.000013151687,0.00011033365,0.000018710009,0.9619097,0.0014359232,0.009546747,0.026384551,0.000013261601],"about_ca_topic_score_codex":0.0030738702,"about_ca_topic_score_gemma":0.0048422217,"teacher_disagreement_score":0.03248322,"about_ca_system_score_codex":0.00050477555,"about_ca_system_score_gemma":0.0008124529,"threshold_uncertainty_score":0.108667195},"labels":[],"label_agreement":null},{"id":"W2141549267","doi":"10.1109/ccece.1999.808218","title":"Allocation of transmission losses in a deregulated power system network","year":2003,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Transmission (telecommunications); Computer science; Transmission loss; Generator (circuit theory); Electric power system; Deregulation; AC power; Transmission network; Power (physics); Transmission system; Control theory (sociology); Telecommunications; Economics","score_opus":0.0034498061653550197,"score_gpt":0.17083404921130252,"score_spread":0.1673842430459475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141549267","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38523325,0.0003923054,0.6056641,0.00014173998,0.000023774623,0.00009504952,0.00015285109,0.00018684217,0.008110088],"genre_scores_gemma":[0.97212034,0.0002245472,0.025601821,0.000015131797,0.000005117232,0.00006888166,0.00004132913,0.000025245856,0.0018975798],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9996495,0.00017461316,0.000012549626,0.000040969262,0.00006794598,0.000054482687],"domain_scores_gemma":[0.99969757,0.00014181544,0.00006756303,0.000030525123,0.000047848083,0.00001467836],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00074427185,0.00058716425,0.00039494273,0.0004606979,0.00026538005,0.0010350755,0.00069564144,0.0002823564,0.0012377871],"category_scores_gemma":[0.0011366928,0.00030284806,0.00020444278,0.0005896962,0.0004025545,0.0012702813,0.00047258858,0.0003268266,0.000117149015],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055998225,0.000011387411,0.00038661316,0.000014238242,0.000009289934,0.00003946857,0.00002372159,0.9792221,0.0013084937,0.0060173776,0.00013418104,0.01277723],"study_design_scores_gemma":[0.000007427886,0.000033051085,0.00034953374,0.0000034110697,0.00000624144,0.000018204666,0.000017970866,0.9953751,0.0008816246,0.0029704238,0.00033291464,0.0000041985213],"about_ca_topic_score_codex":0.0016743722,"about_ca_topic_score_gemma":0.002930844,"teacher_disagreement_score":0.0016743722,"about_ca_system_score_codex":0.0012363801,"about_ca_system_score_gemma":0.00047974405,"threshold_uncertainty_score":0.008970618},"labels":[],"label_agreement":null},{"id":"W2141888992","doi":"10.1109/ccece.2006.277804","title":"Security-Constrained Unit Commitment using Particle Swarms","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Power system simulation; Particle swarm optimization; Mathematical optimization; Computer science; Set (abstract data type); Integer (computer science); Nonlinear system; Power (physics); Electric power system; Algorithm; Mathematics","score_opus":0.010763305671769472,"score_gpt":0.2106991478315253,"score_spread":0.19993584215975582,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141888992","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009695613,0.00018487652,0.9858673,0.00013594811,0.000049240618,0.000029232668,0.00001320222,0.000113138274,0.0039114594],"genre_scores_gemma":[0.765071,0.0003758312,0.23053685,0.00008577739,0.00007280847,0.00017150908,0.00006944114,0.000040813582,0.0035759832],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972266,0.00010619777,0.000012468811,0.000037395035,0.00010014448,0.000021167465],"domain_scores_gemma":[0.9996644,0.00019667338,0.000047306617,0.000030935564,0.000043370106,0.000017224476],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000581113,0.0005710182,0.00070714514,0.00029477413,0.00029681812,0.0007222914,0.00064644293,0.0007557015,0.0012358174],"category_scores_gemma":[0.0014162536,0.00030784725,0.00039346452,0.00041686828,0.0004760197,0.0006328938,0.00054865674,0.00064826914,0.00020154132],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015799596,0.000010842751,0.000113260874,0.000017187222,0.000016168318,0.000021614382,0.000014032525,0.9751398,0.0006117333,0.010690848,0.00028744104,0.01306131],"study_design_scores_gemma":[0.0000039253728,0.000007577799,0.000014758149,0.0000016735402,0.0000015994088,0.0000034063823,0.0000015683598,0.99810237,0.00012467308,0.0014340722,0.00030315836,0.0000013150533],"about_ca_topic_score_codex":0.0024273447,"about_ca_topic_score_gemma":0.0018289874,"teacher_disagreement_score":0.0024273447,"about_ca_system_score_codex":0.00040534727,"about_ca_system_score_gemma":0.00055769266,"threshold_uncertainty_score":0.0048264265},"labels":[],"label_agreement":null},{"id":"W2142396477","doi":"10.5547/issn0195-6574-ej-vol28-no3-9","title":"An Oligopolistic Electricity Market Model with Interdependent Segments","year":2007,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"HEC Montréal","funders":"","keywords":"Oligopoly; Cournot competition; Economics; Interdependence; Electricity market; Electricity; Microeconomics; Demand curve; Inverse demand function; Market power; Monopoly","score_opus":0.004473645073086492,"score_gpt":0.2031306585315606,"score_spread":0.1986570134584741,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2142396477","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.64645994,0.0011789924,0.24765119,0.0031129618,0.00015934206,0.00039125484,0.0038091333,0.00048456472,0.09675269],"genre_scores_gemma":[0.96258295,0.00039415073,0.009231894,0.0001500291,0.000040957195,0.00015538432,0.0003628321,0.000040185852,0.027041646],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993918,0.0001997311,0.00001898353,0.0001409622,0.00008350397,0.00016499369],"domain_scores_gemma":[0.9992175,0.0002677683,0.00016331767,0.00004888707,0.00012241323,0.00018000067],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006476352,0.0010214638,0.0012872049,0.00057049835,0.0011426335,0.0024867638,0.0026248917,0.002471197,0.008304225],"category_scores_gemma":[0.0013448449,0.00095099816,0.0007448189,0.001736335,0.0015966828,0.0021492192,0.0010975515,0.0015058423,0.0007600127],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025659087,0.00011135274,0.0012835514,0.00005993474,0.000080011094,0.0006178979,0.00015060337,0.9176766,0.0014540259,0.0743144,0.0014089044,0.0025860935],"study_design_scores_gemma":[0.00011971713,0.000050283026,0.00060604524,0.0000063353486,0.00003281291,0.000054344604,0.000055673107,0.9880514,0.00010446436,0.0094528,0.001443826,0.00002222864],"about_ca_topic_score_codex":0.098188944,"about_ca_topic_score_gemma":0.078819476,"teacher_disagreement_score":0.098188944,"about_ca_system_score_codex":0.0040004244,"about_ca_system_score_gemma":0.00295452,"threshold_uncertainty_score":0.19523484},"labels":[],"label_agreement":null},{"id":"W2142713059","doi":"10.1109/pesw.2000.850064","title":"Generator contribution coefficients for pricing transmission services","year":2002,"lang":"en","type":"article","venue":"2000 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.00CH37077)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland; Government of Newfoundland and Labrador","funders":"","keywords":"Generator (circuit theory); Electric power transmission; Computer science; Slack bus; Electric power system; Transmission (telecommunications); Tariff; Flow (mathematics); Power flow; Transmission line; Transmission system; Power-flow study; Mathematical optimization; Power (physics); AC power; Electrical engineering; Telecommunications; Mathematics; Voltage; Engineering; Economics","score_opus":0.006112609138245592,"score_gpt":0.18536161855571537,"score_spread":0.17924900941746977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2142713059","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015927508,0.0005609456,0.9194006,0.00067866984,0.00062284386,0.00026897003,0.00053568935,0.00084485713,0.061159886],"genre_scores_gemma":[0.43964118,0.0020245942,0.5103338,0.00034457332,0.00042898755,0.00054728915,0.001429649,0.001192511,0.04405743],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981516,0.00055971654,0.00004454721,0.000116299976,0.0009777333,0.00015013664],"domain_scores_gemma":[0.997736,0.0010788677,0.00013045956,0.00029105367,0.0007002256,0.0000633827],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002598779,0.0011362225,0.00049887365,0.0018735967,0.0005784282,0.001692919,0.0015766781,0.0009729101,0.014080439],"category_scores_gemma":[0.016645843,0.00044334267,0.0006311298,0.0022504518,0.00034831808,0.0025176564,0.0007463269,0.0022757808,0.0045086388],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012047687,0.00011311464,0.0020581859,0.00016556545,0.00004193056,0.00016685795,0.00013279228,0.27344316,0.0056977132,0.4257403,0.02809542,0.26422444],"study_design_scores_gemma":[0.000053433094,0.000045875495,0.0015785428,0.00010861997,0.00003945177,0.0002495777,0.0000640908,0.87438995,0.0045147557,0.06857066,0.05032013,0.00006485036],"about_ca_topic_score_codex":0.004552583,"about_ca_topic_score_gemma":0.006975921,"teacher_disagreement_score":0.014080439,"about_ca_system_score_codex":0.001279199,"about_ca_system_score_gemma":0.0016050127,"threshold_uncertainty_score":0.047103763},"labels":[],"label_agreement":null},{"id":"W2143241152","doi":"10.1109/ccece.2009.5090088","title":"Evaluation and comparison of economical efficiency of HVDC and AC transmission","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Reactance; Software; Electric power transmission; Transmission line; Computer science; Transmission (telecommunications); Process (computing); Transmission system; Reliability engineering; Engineering; Electrical engineering; Voltage; Telecommunications; Operating system","score_opus":0.012293521818996764,"score_gpt":0.2612209961723501,"score_spread":0.24892747435335336,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143241152","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88229877,0.00021032522,0.101099014,0.000060889775,0.00002208765,0.00018719776,0.00042868755,0.0016449102,0.014048097],"genre_scores_gemma":[0.95421934,0.000081671715,0.043616276,0.000007790854,0.0000040779382,0.00008499661,0.00036969816,0.00016498817,0.0014511691],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99835974,0.0005721351,0.00008439161,0.00013005476,0.0007829711,0.00007071588],"domain_scores_gemma":[0.99615496,0.002362487,0.00032615467,0.00037280194,0.0007214997,0.00006201543],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002022904,0.0004845848,0.0005963717,0.0019446439,0.0002074461,0.0008754611,0.0006393547,0.00034814893,0.0026527378],"category_scores_gemma":[0.0070417654,0.00022820968,0.00038793904,0.0012727791,0.0002767562,0.0009628958,0.00038896626,0.00018286497,0.00032728212],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002141869,0.0005677608,0.042278606,0.00035669928,0.0002810924,0.00021857503,0.00022688587,0.46646225,0.027825402,0.0069511575,0.0022961858,0.4503935],"study_design_scores_gemma":[0.00015050419,0.001043995,0.037988674,0.00003305596,0.000085968255,0.00014886998,0.00014889524,0.9074744,0.047663253,0.0018715159,0.0033080794,0.00008276416],"about_ca_topic_score_codex":0.002138779,"about_ca_topic_score_gemma":0.0020556021,"teacher_disagreement_score":0.0026527378,"about_ca_system_score_codex":0.0006241121,"about_ca_system_score_gemma":0.0003587137,"threshold_uncertainty_score":0.010698259},"labels":[],"label_agreement":null},{"id":"W2143713801","doi":"10.1109/pes.2006.1708976","title":"Supply adequacy mechanisms and cross-border contracts in the Central American regional electricity market","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Business; Electricity market; Industrial organization; Mains electricity; Electricity; Engineering","score_opus":0.003028271181776102,"score_gpt":0.22466657109957616,"score_spread":0.22163829991780007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143713801","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7217697,0.0018951327,0.09720854,0.0066108666,0.00012939783,0.00010742895,0.00008490131,0.00026205333,0.17193206],"genre_scores_gemma":[0.9931967,0.00020638158,0.0038947547,0.00016885033,0.000027705502,0.000017351422,0.000010636492,0.000012008393,0.002465636],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9976306,0.0012118442,0.00010676791,0.0001837613,0.0005347608,0.00033215425],"domain_scores_gemma":[0.99431723,0.0028596253,0.0010649936,0.0005715398,0.0008900323,0.00029656186],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0058523933,0.000182636,0.0003177235,0.000687899,0.0014370552,0.0033124147,0.0010648672,0.0014513396,0.0054211863],"category_scores_gemma":[0.010236903,0.00027820596,0.00033303516,0.00077351386,0.0027354704,0.0031624609,0.001415107,0.001633002,0.00021212106],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006971542,0.000045718396,0.0022962014,0.00003171838,0.000025238178,0.00029851228,0.000603552,0.01961016,0.001009872,0.95977193,0.0014562473,0.014781069],"study_design_scores_gemma":[0.0005119848,0.0003632282,0.023800818,0.00031780917,0.00013708699,0.0008065921,0.0034049791,0.13216515,0.0042160475,0.74260324,0.09150016,0.0001729798],"about_ca_topic_score_codex":0.008415687,"about_ca_topic_score_gemma":0.008926106,"teacher_disagreement_score":0.008415687,"about_ca_system_score_codex":0.0016253741,"about_ca_system_score_gemma":0.0024231304,"threshold_uncertainty_score":0.030950725},"labels":[],"label_agreement":null},{"id":"W2144133756","doi":"10.1109/pes.2011.6039089","title":"Stochastic analysis of wind penetration impact on electricity market prices","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Electricity generation; Monte Carlo method; Electricity market; Wind speed; Wake; Electric power system; Computer science; Electricity; Stochastic process; Meteorology; Power (physics); Engineering; Electrical engineering; Aerospace engineering; Mathematics; Physics","score_opus":0.010328127320952635,"score_gpt":0.21396768561232618,"score_spread":0.20363955829137353,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144133756","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8726913,0.0003059453,0.109398745,0.0007034404,0.00006177021,0.000029630773,0.00039066456,0.00013952109,0.016278887],"genre_scores_gemma":[0.9983278,0.00009427246,0.0010727926,0.000012116956,0.0000122974225,0.0000061156084,0.000044352895,0.000010555341,0.00041980084],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994655,0.00029188176,0.00001610671,0.000041471172,0.00009900064,0.00008607232],"domain_scores_gemma":[0.9939879,0.0050109345,0.00048427805,0.00015249773,0.00027986316,0.00008445258],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013926346,0.0004206482,0.0004258761,0.00039093933,0.00021999114,0.0008123175,0.00040044173,0.0005317947,0.002116361],"category_scores_gemma":[0.0077837096,0.00046879658,0.0005514157,0.00054452533,0.00055463717,0.00088129914,0.00042731076,0.00080518005,0.00011456256],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036548652,0.000014342377,0.0011312995,0.000012591524,0.000018202396,0.000107192005,0.000007986321,0.9866078,0.00045540006,0.010348507,0.0001269944,0.0011331647],"study_design_scores_gemma":[0.000003151395,0.000014260107,0.00074617536,0.0000014708162,0.000004696989,0.000012227108,0.000005484925,0.99728405,0.00013082473,0.0017444727,0.000049481547,0.000003713938],"about_ca_topic_score_codex":0.004244595,"about_ca_topic_score_gemma":0.003724245,"teacher_disagreement_score":0.004244595,"about_ca_system_score_codex":0.00062545785,"about_ca_system_score_gemma":0.0005362212,"threshold_uncertainty_score":0.008439779},"labels":[],"label_agreement":null},{"id":"W2144696934","doi":"10.1109/mper.2002.4311743","title":"Modeling Competition in Transmission Expansion","year":2002,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Transmission (telecommunications); Competition (biology); Investment (military); Electricity market; Lagrangian relaxation; Electricity; Reliability (semiconductor); Industrial organization; Transmission system; Key (lock); Computer science; Operator (biology); Business; Telecommunications; Engineering; Mathematical optimization; Electrical engineering; Mathematics; Computer security","score_opus":0.011476498320397105,"score_gpt":0.19926032966697318,"score_spread":0.18778383134657609,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144696934","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18124346,0.0043079956,0.5242339,0.0067285355,0.00047193194,0.0002896048,0.0011669003,0.0002055214,0.28135213],"genre_scores_gemma":[0.9359812,0.0021155654,0.021614578,0.00035774958,0.00020791823,0.0003174598,0.00024302147,0.00008647886,0.03907606],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989641,0.0005424778,0.000024023353,0.00013138623,0.000112261805,0.00022571007],"domain_scores_gemma":[0.9978549,0.0014409926,0.00025115605,0.000074740354,0.00017941851,0.00019890296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016898721,0.0009375098,0.00110898,0.00086757255,0.00086502923,0.0026148083,0.002072916,0.0030606424,0.014790611],"category_scores_gemma":[0.0049226927,0.0005745772,0.0011945372,0.0015028557,0.0019693512,0.00306522,0.0017284976,0.0020222063,0.0009304646],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038273265,0.0000553679,0.00045837407,0.00006310766,0.000024883686,0.0002157005,0.00010731678,0.6542601,0.0002524061,0.33896258,0.0022102566,0.0033515908],"study_design_scores_gemma":[0.000043963682,0.000040764087,0.0002758211,0.00002361385,0.000017506934,0.000062757856,0.00009644364,0.87311673,0.000051444455,0.12100535,0.0052486607,0.000016907501],"about_ca_topic_score_codex":0.0140861645,"about_ca_topic_score_gemma":0.011644924,"teacher_disagreement_score":0.014790611,"about_ca_system_score_codex":0.0026930368,"about_ca_system_score_gemma":0.00201634,"threshold_uncertainty_score":0.049479544},"labels":[],"label_agreement":null},{"id":"W2144728297","doi":"10.1109/melcon.2006.1653253","title":"Tools for Voltage Collapse Assessment","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Electric power system; Market clearing; Computation; Electricity market; Electricity; Mathematical optimization; Variety (cybernetics); Maximum power transfer theorem; Voltage; Power (physics); Reliability engineering; Engineering; Economics; Electrical engineering; Algorithm; Mathematics","score_opus":0.007641639441017883,"score_gpt":0.22226701919803662,"score_spread":0.21462537975701873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144728297","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007666817,0.00030221662,0.9849207,0.00008250394,0.00004541351,0.0000832942,0.0005990312,0.004378896,0.00882131],"genre_scores_gemma":[0.09453871,0.0018760705,0.8887598,0.00013594591,0.00019842021,0.00083191204,0.0029244914,0.0013315746,0.009403095],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991009,0.00022589648,0.00008547278,0.000115633295,0.00041670588,0.000055367025],"domain_scores_gemma":[0.99734867,0.0012729357,0.00027445203,0.00045894043,0.00056731846,0.00007769521],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001376657,0.0019733554,0.0013626784,0.006391424,0.0006769458,0.0022335057,0.0018923566,0.0010867247,0.037261434],"category_scores_gemma":[0.011475892,0.00067123945,0.0013200049,0.003574807,0.00065710297,0.0030051128,0.0026465685,0.0020926492,0.012548494],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008416159,0.000119307064,0.0014619738,0.00070192816,0.000113502756,0.00052010396,0.0002978559,0.20703278,0.0051273294,0.26092398,0.03431276,0.48930433],"study_design_scores_gemma":[0.00003532882,0.000050253337,0.00051951327,0.0002265764,0.00003241995,0.0005051304,0.00012121967,0.6863108,0.0023064807,0.23798838,0.07183295,0.00007091061],"about_ca_topic_score_codex":0.0016566522,"about_ca_topic_score_gemma":0.0017830423,"teacher_disagreement_score":0.037261434,"about_ca_system_score_codex":0.0004312529,"about_ca_system_score_gemma":0.0008177454,"threshold_uncertainty_score":0.12465191},"labels":[],"label_agreement":null},{"id":"W2145144002","doi":"10.1109/cigre.2005.1532759","title":"Congestion management by commitment &amp; amp; dispatch in the balancing market","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kinectrics (Canada)","funders":"","keywords":"Economic dispatch; Power system simulation; Computer science; Electricity market; Mathematical optimization; Software; Process (computing); Linear programming; Operations research; Network congestion; Electric power system; Electricity; Power (physics); Computer network; Engineering; Operating system","score_opus":0.004138869084942728,"score_gpt":0.1893742710394484,"score_spread":0.18523540195450566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2145144002","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.062196217,0.0006516534,0.9084972,0.00096685905,0.00010631297,0.00009894104,0.000055940145,0.0002925675,0.027134232],"genre_scores_gemma":[0.86219525,0.00063223875,0.12345812,0.00006877205,0.00006574816,0.00010415104,0.00006687341,0.00015386422,0.013254884],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989937,0.00058525876,0.00003111226,0.000080931284,0.00024459232,0.00006445953],"domain_scores_gemma":[0.99947757,0.00029905632,0.00006531713,0.000040548788,0.00008170249,0.000035847705],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014852026,0.000491582,0.00046530706,0.0005177327,0.00054511684,0.0015770482,0.0006637169,0.00050827325,0.0046850545],"category_scores_gemma":[0.0025846653,0.00033549787,0.00022659138,0.00083325297,0.001111124,0.0024794494,0.0008929665,0.001109678,0.0005887715],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025295027,0.00007186279,0.00041244712,0.00013854282,0.00002004595,0.00015925436,0.00021714576,0.70153004,0.0046798377,0.18748184,0.002660225,0.10237587],"study_design_scores_gemma":[0.000034092827,0.000037009602,0.00024713468,0.00001085631,0.000005900385,0.000042639,0.000081838974,0.94569737,0.002230843,0.047894035,0.003704495,0.000013881936],"about_ca_topic_score_codex":0.0030874573,"about_ca_topic_score_gemma":0.0021765304,"teacher_disagreement_score":0.0046850545,"about_ca_system_score_codex":0.0009896071,"about_ca_system_score_gemma":0.00088951876,"threshold_uncertainty_score":0.015673041},"labels":[],"label_agreement":null},{"id":"W2145913843","doi":"10.1109/pes.2003.1270423","title":"Power price in deregulated markets","year":2004,"lang":"en","type":"article","venue":"2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Incentive; Economics; Evening; Morning; Market price; Mid price; Consistency (knowledge bases); Monetary economics; Econometrics; Price level; Microeconomics; Mathematics","score_opus":0.0034861524641936975,"score_gpt":0.18152606092577026,"score_spread":0.17803990846157655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2145913843","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99626166,0.00011565269,0.00073583046,0.00005889238,0.000010403324,0.0000074393533,0.00040332085,0.000025191404,0.0023815352],"genre_scores_gemma":[0.99878293,0.000052066913,0.00024754507,0.000011633686,0.000013005945,0.0000041792496,0.00050630525,0.0000104895225,0.0003720024],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995504,0.00007006459,0.000035074063,0.00010979586,0.00015085476,0.000083863284],"domain_scores_gemma":[0.99808073,0.00052553153,0.00067983614,0.00014636441,0.0004419789,0.00012553309],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00067355344,0.000181909,0.0004050759,0.0009961834,0.0002273503,0.0013983673,0.00046354753,0.00032363544,0.0028881254],"category_scores_gemma":[0.0037517669,0.00019790964,0.00033243626,0.001599216,0.00027610734,0.0015388832,0.0004241946,0.0003323317,0.00037947897],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0029236078,0.00063504284,0.75215304,0.00038094958,0.00074971834,0.0036921038,0.0022486737,0.08005468,0.021262318,0.015222189,0.009171098,0.11150655],"study_design_scores_gemma":[0.000060816354,0.00026785725,0.90697217,0.000017010227,0.0000550523,0.0006953518,0.00057297165,0.08128388,0.0024005761,0.0037790197,0.0038337742,0.00006154526],"about_ca_topic_score_codex":0.0029776618,"about_ca_topic_score_gemma":0.003707325,"teacher_disagreement_score":0.0029776618,"about_ca_system_score_codex":0.00059982075,"about_ca_system_score_gemma":0.000120498786,"threshold_uncertainty_score":0.0096616745},"labels":[],"label_agreement":null},{"id":"W2146926333","doi":"10.1109/tpwrs.2012.2230029","title":"Security-Constrained Unit Commitment With Uncertain Wind Generation: The Loadability Set Approach","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Economic dispatch; Mathematical optimization; Electric power system; Set (abstract data type); Wind power; Software deployment; Reliability (semiconductor); Computer science; Power (physics); Engineering; Reliability engineering; Mathematics","score_opus":0.024220335845104336,"score_gpt":0.2230311499502254,"score_spread":0.19881081410512108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2146926333","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0077530444,0.00016230624,0.9883478,0.00023101523,0.00003085707,0.000041069514,0.00009625769,0.00012266377,0.0032149346],"genre_scores_gemma":[0.7484122,0.0004914091,0.24599326,0.0001852592,0.00011964542,0.00034023385,0.00037164427,0.00019560962,0.0038907875],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99890137,0.00060192007,0.00003400373,0.00010858782,0.00027476295,0.00007928136],"domain_scores_gemma":[0.9989225,0.00067804777,0.000126335,0.00011182994,0.00011313229,0.00004809319],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00153009,0.0013172206,0.001209467,0.00062216586,0.00040665662,0.001124601,0.0018954644,0.00085069786,0.0037898875],"category_scores_gemma":[0.003621455,0.00059694634,0.00084977306,0.0011532935,0.0008448005,0.0016908547,0.0013096425,0.0017761429,0.0003690997],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018523435,0.000008933086,0.00007449654,0.000020052477,0.000018698882,0.000034692508,0.0000139462245,0.97826517,0.00019963438,0.0134774875,0.00034726725,0.0075211828],"study_design_scores_gemma":[0.0000043743976,0.0000063926755,0.000015648164,0.0000033163878,0.0000021277128,0.000005385586,0.0000024635808,0.9924906,0.00010464419,0.007123199,0.00023878642,0.0000030419365],"about_ca_topic_score_codex":0.00430941,"about_ca_topic_score_gemma":0.0028391383,"teacher_disagreement_score":0.00430941,"about_ca_system_score_codex":0.00090936956,"about_ca_system_score_gemma":0.0011797145,"threshold_uncertainty_score":0.012678504},"labels":[],"label_agreement":null},{"id":"W2146931510","doi":"10.1109/epec.2009.5420912","title":"Modified bacterial foraging algorithm for optimum economic dispatch","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Foraging; Mathematical optimization; Convergence (economics); Curse of dimensionality; Computer science; Algorithm; Mathematics; Artificial intelligence","score_opus":0.006756343551767031,"score_gpt":0.20748469015439627,"score_spread":0.20072834660262925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2146931510","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007432746,0.0010282544,0.98367,0.00021162111,0.00014950162,0.000083967876,0.00005384568,0.0002176491,0.0071524032],"genre_scores_gemma":[0.23883004,0.0012701583,0.7492635,0.00015370836,0.00010884317,0.0006162394,0.00020707822,0.00015279814,0.00939773],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996202,0.00014619522,0.00001865518,0.00003781807,0.0001433361,0.000033665005],"domain_scores_gemma":[0.9997373,0.00013481882,0.000025640307,0.000017470667,0.000070272436,0.000014447177],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006807703,0.0009559463,0.0012000124,0.0006972851,0.00043902674,0.0006217246,0.0011440967,0.0012146484,0.0034999726],"category_scores_gemma":[0.0016366685,0.0003314154,0.00072401355,0.00079112925,0.0003928182,0.0006471854,0.0006131314,0.0008046938,0.0008513064],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006723885,0.000029999579,0.00024416167,0.00010411545,0.000050486666,0.00008201839,0.0000467267,0.89296806,0.002089269,0.018890807,0.0026895655,0.08273761],"study_design_scores_gemma":[0.000023286551,0.000025455554,0.00007265395,0.000010942734,0.0000067448127,0.000030375908,0.0000050462336,0.9912377,0.00029686277,0.004386208,0.003897087,0.000007574311],"about_ca_topic_score_codex":0.0028647615,"about_ca_topic_score_gemma":0.0019765727,"teacher_disagreement_score":0.0034999726,"about_ca_system_score_codex":0.0006216952,"about_ca_system_score_gemma":0.0009294044,"threshold_uncertainty_score":0.011708617},"labels":[],"label_agreement":null},{"id":"W2147492726","doi":"10.1002/pip.864","title":"Comparing Photovoltaic Capacity Value Metrics: A Case Study for the City of Toronto","year":2008,"lang":"en","type":"article","venue":"Progress in Photovoltaics Research and Applications","topic":"Electric Power System Optimization","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Environment and Climate Change Canada","funders":"Natural Resources Canada; Independent Electricity System Operator; Ontario Power Authority","keywords":"Photovoltaic system; Peak demand; Environmental science; Grid; Nameplate capacity; Value (mathematics); Peaking power plant; Capacity factor; Range (aeronautics); Meteorology; Statistics; Mathematics; Electricity; Power (physics); Electricity generation; Engineering; Electrical engineering; Geography; Physics","score_opus":0.11932815421234567,"score_gpt":0.3581722740692869,"score_spread":0.23884411985694126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2147492726","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99315107,0.00016862307,0.0008760276,0.00011851076,0.00000561997,0.00006453367,0.0026945546,0.000031487754,0.0028896634],"genre_scores_gemma":[0.99664104,0.00009319583,0.0010546863,0.000007328727,0.0000027032456,0.000015583826,0.001547949,0.000005476555,0.00063200697],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995023,0.00010117836,0.000023424593,0.00006723176,0.00018831516,0.00011749449],"domain_scores_gemma":[0.99828243,0.00054795726,0.0002340503,0.00011822492,0.00065096305,0.00016638124],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054197625,0.0004715428,0.0002875131,0.0019945018,0.0009263265,0.0013258536,0.0006840067,0.0004708055,0.0011670025],"category_scores_gemma":[0.0019827196,0.00016627453,0.00043290007,0.0057125497,0.0006561455,0.00042776615,0.0005487122,0.0002776593,0.00010169624],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004835483,0.00031784657,0.6349965,0.0004366491,0.00038982244,0.0065850397,0.0030198116,0.2972074,0.0045873495,0.0048244856,0.0082775,0.03887414],"study_design_scores_gemma":[0.00004009538,0.00018034242,0.80496454,0.00005116343,0.000105795334,0.00041470627,0.008463183,0.17784224,0.002251676,0.00050987274,0.005080046,0.000096337215],"about_ca_topic_score_codex":0.9063601,"about_ca_topic_score_gemma":0.9429281,"teacher_disagreement_score":0.09363991,"about_ca_system_score_codex":0.016577639,"about_ca_system_score_gemma":0.003740609,"threshold_uncertainty_score":0.18838269},"labels":[],"label_agreement":null},{"id":"W2147587918","doi":"10.1109/ccece.2011.6030488","title":"Scheduling of variable-head hydro-thermal generation using an enhanced bacterial foraging algorithm","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Foraging; Mathematical optimization; Computer science; Scheduling (production processes); Job shop scheduling; Convergence (economics); Algorithm; Mathematics; Ecology; Schedule","score_opus":0.030019278531059297,"score_gpt":0.22771962262008094,"score_spread":0.19770034408902165,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2147587918","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1123211,0.00041730082,0.882267,0.00017604348,0.000054074393,0.000059452912,0.000029937684,0.00018401982,0.0044910656],"genre_scores_gemma":[0.8480685,0.00019518811,0.14946155,0.00003603998,0.00002116153,0.00009515049,0.000036817175,0.000028071256,0.0020576797],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998393,0.000061839506,0.000006119893,0.000021332899,0.000046800997,0.000024548046],"domain_scores_gemma":[0.9998017,0.00010234408,0.000027414606,0.000010747904,0.000039969542,0.000017863045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003963282,0.00041909682,0.00062024494,0.00021710098,0.00025281144,0.0002900527,0.0004728373,0.0004376576,0.0009885691],"category_scores_gemma":[0.00076221,0.00023552084,0.00027974223,0.00022186081,0.00028862653,0.000343846,0.00034034805,0.0003170599,0.00011780961],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000061020855,0.00002130224,0.00023079071,0.000025989297,0.000014934136,0.000032399465,0.000023920324,0.9763781,0.0026892421,0.0018935163,0.0002415669,0.018387256],"study_design_scores_gemma":[0.000012259638,0.000025260078,0.000062023006,0.0000018562671,0.0000026630325,0.0000061819833,0.0000029603295,0.998809,0.0002894827,0.0004907579,0.00029593668,0.0000016533096],"about_ca_topic_score_codex":0.0029947804,"about_ca_topic_score_gemma":0.0024149467,"teacher_disagreement_score":0.0029947804,"about_ca_system_score_codex":0.00037027398,"about_ca_system_score_gemma":0.0006497143,"threshold_uncertainty_score":0.005954683},"labels":[],"label_agreement":null},{"id":"W2148537030","doi":"10.2202/1553-779x.1000","title":"Transmission Congestion Management and Pricing in Simple Auction Electricity Markets","year":2004,"lang":"en","type":"article","venue":"International Journal of Emerging Electric Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Bidding; Computer science; Electricity; Transmission (telecommunications); Electricity market; Mathematical optimization; Voltage; Demand response; Demand side; Transmission system; Economics; Microeconomics; Telecommunications; Electrical engineering; Engineering; Mathematics","score_opus":0.00422322843277039,"score_gpt":0.21668018837759023,"score_spread":0.21245695994481983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2148537030","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10679894,0.00011135366,0.89060515,0.00008252554,0.000037884656,0.00009413052,0.000021069282,0.00023709884,0.002011877],"genre_scores_gemma":[0.9167083,0.00005755694,0.08189147,0.000020833699,0.000034667788,0.0000516319,0.000016986496,0.000037731395,0.0011809021],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987664,0.0005860281,0.00004409115,0.00012373383,0.00036234703,0.00011746836],"domain_scores_gemma":[0.9984825,0.0008215489,0.0002820694,0.00015381663,0.00019448157,0.000065535736],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021169148,0.00050971616,0.001226761,0.000632205,0.00044156556,0.0013822359,0.0015670871,0.00057958823,0.0011347785],"category_scores_gemma":[0.004442861,0.0004214495,0.00059951213,0.000652291,0.0009637089,0.002362509,0.00079291186,0.00075413426,0.00010319675],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001501593,0.00013129141,0.0010053869,0.00005241686,0.0000695355,0.0001697942,0.00007928837,0.92277855,0.003276062,0.035472415,0.00037702065,0.03643813],"study_design_scores_gemma":[0.000013945453,0.000019406763,0.00012457666,7.013428e-7,0.0000043765335,0.000016850006,0.0000048294633,0.9947477,0.00033372195,0.004635814,0.00009385819,0.000004122882],"about_ca_topic_score_codex":0.00237939,"about_ca_topic_score_gemma":0.0016974839,"teacher_disagreement_score":0.00237939,"about_ca_system_score_codex":0.0006443009,"about_ca_system_score_gemma":0.00089184835,"threshold_uncertainty_score":0.011195481},"labels":[],"label_agreement":null},{"id":"W2148835898","doi":"10.1109/tpwrs.2008.2007001","title":"A Generic Operations Framework for Discos in Retail Electricity Markets","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":132,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"King Abdulaziz City for Science and Technology","keywords":"Electricity; Scheduling (production processes); Grid; Operations research; Electricity market; Computer science; Electricity retailing; Context (archaeology); Operations management; Engineering","score_opus":0.01225402772100849,"score_gpt":0.2263664480501993,"score_spread":0.2141124203291908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2148835898","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0044180956,0.00043573402,0.97679794,0.00058304926,0.00008620999,0.0003114407,0.000434861,0.0005289969,0.016403563],"genre_scores_gemma":[0.2864066,0.001545256,0.698621,0.00037359187,0.00025818238,0.0008882544,0.0013469461,0.00023134406,0.010328838],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99783045,0.0008030392,0.00024855434,0.00030979584,0.0005682525,0.00023992606],"domain_scores_gemma":[0.9992931,0.0002498555,0.00010350807,0.00010181745,0.00017320426,0.00007847042],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002909315,0.0015196712,0.00085730257,0.0015028414,0.0012293824,0.0050052996,0.0025473284,0.0017674859,0.0057900897],"category_scores_gemma":[0.0021417383,0.00047842655,0.0014767775,0.0020373585,0.0016200683,0.0045083137,0.0020505239,0.0021116845,0.0015143949],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003924149,0.00005333123,0.00049437716,0.00009458728,0.00001714952,0.00029131753,0.00020315287,0.15607153,0.0007131238,0.81887144,0.0042999038,0.018850958],"study_design_scores_gemma":[0.00003617831,0.00006395789,0.00024316885,0.000089015484,0.000019979274,0.00024373164,0.0002241557,0.70504683,0.00060186966,0.2343955,0.05899801,0.000037579437],"about_ca_topic_score_codex":0.00922272,"about_ca_topic_score_gemma":0.0058770585,"teacher_disagreement_score":0.00922272,"about_ca_system_score_codex":0.002492743,"about_ca_system_score_gemma":0.00278026,"threshold_uncertainty_score":0.019369781},"labels":[],"label_agreement":null},{"id":"W2149649017","doi":"10.1109/tpwrs.2011.2146796","title":"Large-Scale Solar PV Investment Models, Tools, and Analysis: The Ontario Case","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Photovoltaic system; Investment (military); Sizing; Profit (economics); Operations research; Computer science; Return on investment; Environmental economics; Engineering; Mathematical optimization; Industrial engineering; Economics; Microeconomics; Mathematics; Electrical engineering","score_opus":0.022602733099798926,"score_gpt":0.19016241724395372,"score_spread":0.16755968414415479,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2149649017","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.70933896,0.0012043882,0.10547073,0.003073503,0.000052788848,0.00039433222,0.0035303833,0.00017545425,0.17675945],"genre_scores_gemma":[0.97297126,0.0007189708,0.009549966,0.000032316446,0.000009664333,0.00007947598,0.00039923817,0.000017757655,0.016221397],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997919,0.000042116713,0.000006236958,0.000023005012,0.0000745059,0.0000623177],"domain_scores_gemma":[0.999734,0.00010125327,0.00003942207,0.000019699972,0.000071914445,0.000033693344],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027054106,0.00048195856,0.00027207212,0.00034851272,0.0010037238,0.0010427262,0.0010648795,0.000682193,0.002860851],"category_scores_gemma":[0.0009059872,0.00030467546,0.00039171826,0.0012424072,0.00073231314,0.00058781856,0.0005388716,0.0004459775,0.00015744887],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053168318,0.000046171856,0.0040598703,0.00004519684,0.000016416454,0.0006837676,0.00012949143,0.9502409,0.00045020832,0.03442059,0.0027108332,0.0071433648],"study_design_scores_gemma":[0.00005491148,0.00003649861,0.004732181,0.000019941748,0.000021777634,0.00012026069,0.0003766284,0.97488225,0.0004232805,0.009572245,0.00973197,0.000028096852],"about_ca_topic_score_codex":0.8488345,"about_ca_topic_score_gemma":0.88444275,"teacher_disagreement_score":0.15116549,"about_ca_system_score_codex":0.0141072385,"about_ca_system_score_gemma":0.008499452,"threshold_uncertainty_score":0.30411142},"labels":[],"label_agreement":null},{"id":"W2149782899","doi":"","title":"Detecting and measuring market power in the Philippine wholesale electricity market","year":2010,"lang":"en","type":"article","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bidding; Electricity market; Market clearing; Electricity; Benchmark (surveying); Collusion; Market power; Industrial organization; Wholesale market; Business; Economics; Quarter (Canadian coin); Electricity retailing; Microeconomics; Engineering; Electrical engineering","score_opus":0.010473899429132138,"score_gpt":0.23040760963221646,"score_spread":0.21993371020308433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2149782899","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99318564,0.00005216364,0.002302349,0.00007735924,0.000006678849,0.000037088073,0.00037941316,0.00014673108,0.0038124884],"genre_scores_gemma":[0.9985483,0.000021751997,0.0009481992,0.0000089022105,0.000005852328,0.0000130914195,0.00021490864,0.000009423588,0.00022955646],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999253,0.00022116725,0.000034381566,0.00011868254,0.00025575722,0.00011701415],"domain_scores_gemma":[0.99713373,0.0010762891,0.000764943,0.00018029241,0.000627125,0.0002175708],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009881444,0.0005128212,0.00029709868,0.0018980335,0.00032193985,0.0012995927,0.0005263258,0.0006278427,0.0011678427],"category_scores_gemma":[0.005015669,0.00025060383,0.00013658302,0.001665361,0.00042806863,0.0010209379,0.00060917344,0.000514365,0.00029221355],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007948508,0.0009948103,0.77630687,0.00028610782,0.0003055636,0.0015509366,0.0025077167,0.08840517,0.03149209,0.0074252384,0.006311359,0.08361927],"study_design_scores_gemma":[0.00004473042,0.00058141956,0.67468506,0.00002060076,0.00003714954,0.00028996315,0.0017159339,0.30666205,0.010926078,0.0020081904,0.002951656,0.00007720487],"about_ca_topic_score_codex":0.011114563,"about_ca_topic_score_gemma":0.010619961,"teacher_disagreement_score":0.011114563,"about_ca_system_score_codex":0.00082292606,"about_ca_system_score_gemma":0.00037206995,"threshold_uncertainty_score":0.022099733},"labels":[],"label_agreement":null},{"id":"W2150161391","doi":"10.1109/ccece.2002.1015168","title":"Transmission congestion relief solutions by load management","year":2003,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Electricity; Electricity market; Congestion management; Transmission (telecommunications); Business; Network congestion; Load management; Electric power system; Consumption (sociology); Computer science; Environmental economics; Industrial organization; Microeconomics; Power (physics); Economics; Computer security; Telecommunications; Engineering","score_opus":0.00511282200010867,"score_gpt":0.1757653938714832,"score_spread":0.17065257187137453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150161391","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2223261,0.000571449,0.7517996,0.0011617482,0.0001176642,0.00025014445,0.00009134634,0.0016626688,0.022019435],"genre_scores_gemma":[0.964783,0.00012818257,0.030804643,0.00011178002,0.000059449598,0.000071636285,0.000053797077,0.000063149266,0.0039244504],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9996637,0.00011695468,0.00001441097,0.00004287702,0.00007529517,0.00008671704],"domain_scores_gemma":[0.99967575,0.000085771884,0.00007701032,0.00005554415,0.00007128848,0.0000346483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046395313,0.0006394162,0.00046471687,0.0004703388,0.00046456273,0.0007276998,0.0011613104,0.00057461177,0.004136652],"category_scores_gemma":[0.0010687648,0.0002316935,0.00029381903,0.00045126872,0.0004616952,0.0012157555,0.0009575498,0.00053106784,0.0004295398],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004053985,0.0004875127,0.0012271431,0.000107307475,0.00006911464,0.00030149723,0.00020603556,0.7998477,0.0156000685,0.024768084,0.0064393645,0.15054063],"study_design_scores_gemma":[0.000101620135,0.00014972547,0.0004467995,0.000010126156,0.000027701235,0.000071213966,0.00008369972,0.9796005,0.003596089,0.012286015,0.0036118424,0.0000146129305],"about_ca_topic_score_codex":0.0019127814,"about_ca_topic_score_gemma":0.0025506916,"teacher_disagreement_score":0.004136652,"about_ca_system_score_codex":0.0004519316,"about_ca_system_score_gemma":0.0005458229,"threshold_uncertainty_score":0.01383847},"labels":[],"label_agreement":null},{"id":"W2150235996","doi":"10.1109/psce.2009.4840044","title":"Transmission planning risk indices - what now?","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Technische Universiteit Eindhoven; Chalmers Tekniska Högskola; Centre for Energy Advancement through Technological Innovation","keywords":"Transmission (telecommunications); Computer science; Risk analysis (engineering); Set (abstract data type); Process (computing); Risk management; Risk perception; Risk assessment; Perception; Business; Computer security; Telecommunications; Psychology","score_opus":0.004755274292984656,"score_gpt":0.2049876647860351,"score_spread":0.20023239049305044,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150235996","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03071448,0.29612863,0.49588206,0.05457486,0.0056039826,0.00018619176,0.0016030151,0.00079496304,0.11451184],"genre_scores_gemma":[0.52255154,0.21023226,0.23812409,0.002636628,0.006090444,0.00031432993,0.0013264868,0.00055902515,0.018165145],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9983814,0.000568969,0.00016502914,0.00017112971,0.0006461306,0.00006728792],"domain_scores_gemma":[0.9952413,0.0019339684,0.0008075423,0.00040502645,0.0013591157,0.00025301386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034683365,0.001204925,0.0010383609,0.0020713196,0.00043483378,0.005508206,0.0015815498,0.0010792793,0.0050092004],"category_scores_gemma":[0.011445223,0.00029874523,0.00056998554,0.0027812491,0.002010698,0.011765118,0.001269925,0.0035653457,0.001266322],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000900207,0.00010128522,0.0047629853,0.000943439,0.00013191123,0.00012645304,0.00043756238,0.027591374,0.0006853468,0.32455498,0.035705276,0.6048693],"study_design_scores_gemma":[0.000033667515,0.0003205518,0.0076479795,0.0034847953,0.00020909011,0.0006760737,0.0018710998,0.05742875,0.0020147937,0.625058,0.30102137,0.00023388224],"about_ca_topic_score_codex":0.0020039768,"about_ca_topic_score_gemma":0.0020437643,"teacher_disagreement_score":0.005508206,"about_ca_system_score_codex":0.0015590762,"about_ca_system_score_gemma":0.0010438666,"threshold_uncertainty_score":0.018342555},"labels":[],"label_agreement":null},{"id":"W2150361993","doi":"10.1109/pes.2008.4596757","title":"A reduced model of the Alberta electric system for policy, regulatory, and future development studies","year":2008,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Reliability (semiconductor); Electricity; Electricity market; Electricity system; Electricity generation; Electric power system; Scale (ratio); Wind power; Transmission system; Electric power transmission; Mains electricity; Environmental economics; Computer science; Environmental science; Transmission (telecommunications); Reliability engineering; Engineering; Economics; Electrical engineering; Telecommunications; Power (physics); Voltage","score_opus":0.014782353068758731,"score_gpt":0.21147846947497856,"score_spread":0.19669611640621984,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150361993","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1696897,0.0014647788,0.34818882,0.006612648,0.00048081615,0.00033958678,0.01411134,0.0010789935,0.4580332],"genre_scores_gemma":[0.85501283,0.0009773141,0.028425744,0.00041596754,0.000105751584,0.00040940492,0.004056075,0.0001860659,0.11041078],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996674,0.000102443904,0.000006674615,0.000038006317,0.00012991746,0.00005557479],"domain_scores_gemma":[0.999713,0.000071108414,0.000021186486,0.000025949663,0.00013412855,0.000034663706],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046648708,0.000705217,0.00084444083,0.0008417652,0.00096722465,0.0017166499,0.0023611372,0.0014104451,0.013892401],"category_scores_gemma":[0.00085007836,0.00047951957,0.00071908743,0.0013830304,0.0008993856,0.0010167146,0.00077217794,0.0017098467,0.0011060163],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027655293,0.00001834888,0.00023157019,0.000015620131,0.000008755943,0.000054021664,0.000024285328,0.95713854,0.0002977733,0.037468802,0.0028001626,0.0019143262],"study_design_scores_gemma":[0.000037954134,0.000018393443,0.00046161094,0.000009246545,0.000013079624,0.000016025415,0.00006429366,0.97514707,0.00009225182,0.012920422,0.0112013845,0.000018353037],"about_ca_topic_score_codex":0.53617823,"about_ca_topic_score_gemma":0.50206286,"teacher_disagreement_score":0.46382177,"about_ca_system_score_codex":0.0069627766,"about_ca_system_score_gemma":0.010073602,"threshold_uncertainty_score":0.9331066},"labels":[],"label_agreement":null},{"id":"W2150459452","doi":"10.1109/pmaps.2006.360194","title":"Transmission Expansion under Risk using Stochastic Programming","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Randomness; Mathematical optimization; Probabilistic logic; Constraint (computer-aided design); Transmission (telecommunications); Computer science; Stochastic programming; Variance (accounting); Stochastic modelling; Stochastic process; Expected value; Capacity planning; Mathematics; Statistics; Economics","score_opus":0.006774774171094178,"score_gpt":0.20009531818731194,"score_spread":0.19332054401621776,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150459452","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019234957,0.0006068134,0.9736597,0.000556195,0.000033735785,0.000034849985,0.000049900784,0.00008703556,0.005736836],"genre_scores_gemma":[0.8922056,0.0016696649,0.09708153,0.000109083056,0.00013435705,0.00020122675,0.000103775164,0.000087852386,0.008406947],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99845445,0.00092454674,0.000037375106,0.0001520795,0.00030571528,0.00012586138],"domain_scores_gemma":[0.99791557,0.0016188144,0.00020100028,0.00006329709,0.00013887542,0.000062465755],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022419132,0.0010424852,0.0012328293,0.0006466789,0.00041468852,0.0018282431,0.00075564027,0.0009464767,0.0018681847],"category_scores_gemma":[0.003938955,0.00069438195,0.00093070837,0.0010256706,0.0010978543,0.0019076793,0.0012215147,0.0015290028,0.00014402071],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012479786,0.000009345261,0.00006884428,0.000023338825,0.000015715863,0.00003428276,0.000015479058,0.95119447,0.00014479186,0.0449383,0.0002118942,0.0033310468],"study_design_scores_gemma":[0.0000054870493,0.000015905658,0.000030777403,0.0000074067366,0.000005852565,0.000012369927,0.00000793189,0.9583409,0.0000851745,0.04113828,0.0003445397,0.0000054006414],"about_ca_topic_score_codex":0.0029900288,"about_ca_topic_score_gemma":0.002107326,"teacher_disagreement_score":0.0029900288,"about_ca_system_score_codex":0.0015152956,"about_ca_system_score_gemma":0.0015694203,"threshold_uncertainty_score":0.011856496},"labels":[],"label_agreement":null},{"id":"W2150807949","doi":"10.1109/pedg.2010.5545792","title":"A study of the reduction of the regional aggregated wind power forecast error by spatial smoothing effects in the Maritime Canada","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Wind power; Smoothing; Wind speed; Meteorology; Environmental science; Forecast error; Wind direction; Spatial correlation; Computer science; Statistics; Econometrics; Mathematics; Geography; Engineering; Telecommunications","score_opus":0.00409037978862284,"score_gpt":0.1786946688157325,"score_spread":0.17460428902710967,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150807949","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98952734,0.00016748294,0.008092067,0.00024077279,0.000010234624,0.000011118484,0.00017990948,0.00009920358,0.0016718509],"genre_scores_gemma":[0.99734724,0.000058807014,0.002099608,0.000010004711,0.0000029349603,0.0000025404179,0.00009047926,0.000009335926,0.00037894867],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995739,0.00007891962,0.000013213078,0.00006915055,0.00019340943,0.00007140429],"domain_scores_gemma":[0.99775213,0.0010515787,0.00015517786,0.000161777,0.00081604125,0.00006329517],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008709199,0.00029398658,0.00027483306,0.0003156451,0.00040145614,0.00050293107,0.0004550059,0.00021566835,0.0003848528],"category_scores_gemma":[0.005931227,0.00014873236,0.00028222988,0.0007514639,0.00032609177,0.0003174398,0.00024797485,0.00037759598,0.000042741765],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027045186,0.00004784488,0.08542815,0.000047641173,0.00016431871,0.00022286603,0.00018762637,0.85851425,0.003868008,0.001983521,0.00078000413,0.048485316],"study_design_scores_gemma":[0.00001819607,0.00005386317,0.101548605,0.000007658658,0.000058302885,0.000035224013,0.00017205405,0.893523,0.0034826165,0.00035315088,0.0007286599,0.00001862701],"about_ca_topic_score_codex":0.81803495,"about_ca_topic_score_gemma":0.7633803,"teacher_disagreement_score":0.18196505,"about_ca_system_score_codex":0.0028433234,"about_ca_system_score_gemma":0.005248268,"threshold_uncertainty_score":0.3660733},"labels":[],"label_agreement":null},{"id":"W2150823515","doi":"10.1016/j.jup.2014.03.006","title":"The EU internal electricity market: Done forever?","year":2014,"lang":"en","type":"article","venue":"Utilities Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":98,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Decentralization; Electricity market; Domestic market; Quarter (Canadian coin); Consumption (sociology); Economics; Market economy; Renewable energy; Business; Payment; Industrial organization; Economic policy; International trade; Finance; Engineering","score_opus":0.003202275714546914,"score_gpt":0.1913101816904742,"score_spread":0.18810790597592728,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150823515","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03561886,0.032518733,0.0044658366,0.7786881,0.012365351,0.00002225152,0.0006716968,0.0002247748,0.13542446],"genre_scores_gemma":[0.67148155,0.018002344,0.003078341,0.23753923,0.0053137224,0.000055865286,0.0004146186,0.00030099665,0.063813366],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99773115,0.00077188684,0.00008408647,0.00030800345,0.00045081208,0.0006541586],"domain_scores_gemma":[0.9975224,0.00075027125,0.00027667492,0.0001942099,0.00056588394,0.00069050596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005633352,0.0006095405,0.0010888319,0.0005781168,0.0016055484,0.013264767,0.001194953,0.011275335,0.017750451],"category_scores_gemma":[0.011527874,0.00023130457,0.00067929015,0.0010717313,0.0040502483,0.013521752,0.0028961736,0.006144696,0.0026869886],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025950363,0.00011395592,0.0014080103,0.00021825114,0.00008563408,0.00019549209,0.0004293644,0.001658957,0.00054535444,0.77426475,0.15693304,0.06388772],"study_design_scores_gemma":[0.00012352418,0.000119315795,0.006081088,0.0015044337,0.00010109468,0.0002118408,0.003907179,0.0021103967,0.0011298581,0.44261032,0.5419762,0.00012476636],"about_ca_topic_score_codex":0.007261025,"about_ca_topic_score_gemma":0.008312554,"teacher_disagreement_score":0.017750451,"about_ca_system_score_codex":0.0025683625,"about_ca_system_score_gemma":0.007166547,"threshold_uncertainty_score":0.059381127},"labels":[],"label_agreement":null},{"id":"W2151027979","doi":"10.1109/59.910787","title":"Z-bus loss allocation","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":405,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Exploit; Computer science; Mathematical optimization; Computation; Context (archaeology); Process (computing); Consistency (knowledge bases); Electric power system; Flow network; Power (physics); Bus network; Matrix (chemical analysis); Set (abstract data type); Algorithm; Mathematics; System bus","score_opus":0.00764439158587871,"score_gpt":0.19930127205171727,"score_spread":0.19165688046583856,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151027979","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006112179,0.000042693224,0.9900192,0.000034718978,0.000015768033,0.00004520429,0.00002207178,0.00024882762,0.003459395],"genre_scores_gemma":[0.33277315,0.00019090498,0.6524476,0.000079660684,0.00005415586,0.00021306802,0.0001574617,0.00029423245,0.013789761],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996513,0.00010110402,0.000015679148,0.000055783265,0.00012920392,0.000046831487],"domain_scores_gemma":[0.999767,0.000056049645,0.0000412536,0.00004700296,0.000071188864,0.000017507431],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005796559,0.0005383873,0.0006050097,0.0006300888,0.0005340867,0.0009488608,0.0010347486,0.00033960826,0.007899743],"category_scores_gemma":[0.0011012732,0.00020882675,0.00037641713,0.0004529106,0.00036649642,0.0010175762,0.0008950372,0.00062070205,0.001546597],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020376773,0.0000979319,0.00078269833,0.00012685398,0.0000468704,0.00010183161,0.00014340125,0.4510859,0.01284656,0.11186245,0.005077947,0.4176238],"study_design_scores_gemma":[0.000036319452,0.00009602066,0.0004495071,0.000013220589,0.00001583727,0.000089266934,0.000029002491,0.94433,0.0066524292,0.03842975,0.009838871,0.000019838108],"about_ca_topic_score_codex":0.0013064016,"about_ca_topic_score_gemma":0.0019200239,"teacher_disagreement_score":0.007899743,"about_ca_system_score_codex":0.00059101504,"about_ca_system_score_gemma":0.00090425194,"threshold_uncertainty_score":0.02642721},"labels":[],"label_agreement":null},{"id":"W2151066229","doi":"10.1109/59.867139","title":"Generation scheduling and the switching curve law","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Lagrangian relaxation; Scheduling (production processes); Mathematical optimization; Computer science; Dual (grammatical number); Electric power system; Power (physics); Law; Mathematics; Mathematical economics; Political science; Physics","score_opus":0.010756387473722682,"score_gpt":0.20234949841345587,"score_spread":0.1915931109397332,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151066229","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07057827,0.00076364435,0.81439793,0.0025036233,0.00017392237,0.000052630938,0.00014489178,0.00038068427,0.1110045],"genre_scores_gemma":[0.96376616,0.00059327023,0.022278385,0.00023580932,0.00013849512,0.00004387927,0.00007423184,0.00009272708,0.012777162],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9996363,0.00010470003,0.000009176233,0.000051473737,0.00012201211,0.00007637668],"domain_scores_gemma":[0.99914265,0.00044245992,0.00010284989,0.00008524043,0.0001443745,0.000082351355],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007223946,0.00026174498,0.00030153114,0.00035686823,0.0003524203,0.0010204045,0.0006029294,0.00055561285,0.007638631],"category_scores_gemma":[0.0037145037,0.00017716088,0.00026016287,0.0005452457,0.0015387498,0.0011211914,0.00054394075,0.0012401934,0.0006708858],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003236817,0.000025524145,0.00016277269,0.00001959701,0.0000052344058,0.000042500684,0.000053033928,0.18059786,0.00087692245,0.79495096,0.002554136,0.020679126],"study_design_scores_gemma":[0.000021451211,0.000031150692,0.00019404975,0.000009488229,0.0000021361782,0.000029271743,0.000027118966,0.4691432,0.00028321607,0.5253471,0.0049037407,0.00000807498],"about_ca_topic_score_codex":0.0031708556,"about_ca_topic_score_gemma":0.0011049707,"teacher_disagreement_score":0.007638631,"about_ca_system_score_codex":0.001337831,"about_ca_system_score_gemma":0.001017582,"threshold_uncertainty_score":0.025553763},"labels":[],"label_agreement":null},{"id":"W2151705052","doi":"","title":"Models for electricity market efficiency and bidding strategy analysis","year":2005,"lang":"en","type":"dissertation","venue":"Texas ScholarWorks (Texas Digital Library)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Independent Electricity System Operator; China Scholarship Council; Natural Environment Research Council; Tower Cancer Research Foundation","keywords":"Bidding; Electricity market; Electricity; Industrial organization; Environmental economics; Microeconomics; Business; Economics; Engineering; Electrical engineering","score_opus":0.007427637144534899,"score_gpt":0.20797735388403701,"score_spread":0.20054971673950212,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151705052","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023566931,0.0011114704,0.91937226,0.0012190294,0.00010938991,0.00006479277,0.0003266465,0.00024989503,0.053979687],"genre_scores_gemma":[0.8479204,0.0018240656,0.072298296,0.0003068339,0.00019314916,0.00032865055,0.00052995223,0.00039387887,0.07620486],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945885,0.00027724958,0.000018586914,0.00004437787,0.00012937497,0.00007159128],"domain_scores_gemma":[0.99891126,0.0007550326,0.00008255841,0.00006320671,0.00014955927,0.000038366215],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013026599,0.0010336742,0.0013572255,0.0007727123,0.00046703455,0.0016934348,0.0020817253,0.0014700455,0.0105702495],"category_scores_gemma":[0.005001321,0.0007583354,0.001145604,0.0013001758,0.0008697058,0.002551745,0.0007961812,0.0016457378,0.001333556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016730231,0.00003915461,0.00014474825,0.00002989557,0.000025049772,0.000030375797,0.000038869843,0.7997969,0.0001564487,0.19016208,0.0027216622,0.006838066],"study_design_scores_gemma":[0.0000060402554,0.0000045897973,0.000057449095,0.000003757633,0.0000063453167,0.000009469519,0.000009752239,0.93982434,0.000035969173,0.059045475,0.000993353,0.0000033720553],"about_ca_topic_score_codex":0.0076083643,"about_ca_topic_score_gemma":0.0072212685,"teacher_disagreement_score":0.0105702495,"about_ca_system_score_codex":0.0019224259,"about_ca_system_score_gemma":0.0010323633,"threshold_uncertainty_score":0.03536105},"labels":[],"label_agreement":null},{"id":"W2152585623","doi":"10.1109/tpwrs.2003.810676","title":"Reconciling social welfare, agent profits, and consumer payments in electricity pools","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Microeconomics; Economics; Revenue; Electricity; Profit (economics); Electricity market; Marginal cost; Marginal profit; Payment; Transfer payment; Schedule; Social Welfare; Welfare; Engineering; Market economy; Finance","score_opus":0.012374998286326709,"score_gpt":0.21533427865897367,"score_spread":0.20295928037264696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152585623","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5327817,0.0005520967,0.4263468,0.002826309,0.000061344545,0.00017532909,0.00008441643,0.00009024127,0.03708172],"genre_scores_gemma":[0.98635584,0.00012994862,0.010492309,0.000058582205,0.000021948057,0.0000778357,0.00001555868,0.000017863103,0.0028301028],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99703,0.0018502418,0.00008340242,0.0002057198,0.0003710323,0.0004594462],"domain_scores_gemma":[0.99781525,0.001331626,0.00031248925,0.00019667011,0.00016423849,0.0001796809],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045332126,0.0009452539,0.0009379324,0.0009936658,0.0013276916,0.0029764967,0.0009204807,0.001429043,0.002862734],"category_scores_gemma":[0.007559327,0.00048302376,0.0005120609,0.0009930066,0.0026518058,0.005161714,0.003599236,0.0009512858,0.00019991527],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023472277,0.000091049624,0.0013112408,0.00006425421,0.000059671496,0.0003159818,0.00041261638,0.2660016,0.0012500958,0.7052404,0.00085287093,0.024165386],"study_design_scores_gemma":[0.00007576359,0.00011276497,0.00066945166,0.000032096883,0.000037954644,0.00009243606,0.00037044202,0.30296627,0.0011860471,0.69186014,0.0025740182,0.000022577355],"about_ca_topic_score_codex":0.0012967236,"about_ca_topic_score_gemma":0.0014251921,"teacher_disagreement_score":0.0045332126,"about_ca_system_score_codex":0.0025706172,"about_ca_system_score_gemma":0.0023181194,"threshold_uncertainty_score":0.02397424},"labels":[],"label_agreement":null},{"id":"W2152717061","doi":"10.1109/tpwrs.2002.804955","title":"Combined pool/bilateral dispatch. II. Curtailment of firm and nonfirm contracts","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Bidding; Revenue; Microeconomics; Economic dispatch; Payment; Economics; Industrial organization; Business; Commodity; Power (physics); Electric power system; Finance","score_opus":0.007939023995683081,"score_gpt":0.18135859198546633,"score_spread":0.17341956798978325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152717061","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5572182,0.00070052064,0.3985284,0.0003353322,0.00006921319,0.00035706643,0.00020592242,0.00022522063,0.042360168],"genre_scores_gemma":[0.97907716,0.00006758869,0.01748659,0.000037433176,0.000014386071,0.000059175807,0.00003422286,0.00001640012,0.0032070966],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99757093,0.0009740797,0.00013483211,0.00030620332,0.00071785646,0.00029607912],"domain_scores_gemma":[0.9980563,0.00087244983,0.0003811275,0.00034895827,0.00017718581,0.00016405273],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025821037,0.0005565852,0.0008065335,0.00036448514,0.0003986303,0.0017417504,0.0014631678,0.0007201456,0.004616432],"category_scores_gemma":[0.005021612,0.00031834017,0.0005166417,0.0005921566,0.00076069526,0.002582052,0.0013549938,0.000859303,0.00034253942],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017145372,0.00034215135,0.007439059,0.00035505995,0.00023494467,0.0009562386,0.00030598612,0.67215765,0.023896933,0.08098983,0.0013807602,0.21022686],"study_design_scores_gemma":[0.00013097457,0.0007382945,0.0036918826,0.000028129638,0.000082176244,0.0003076193,0.00013943792,0.9679794,0.005180668,0.018261675,0.0034250633,0.000034606743],"about_ca_topic_score_codex":0.0014564063,"about_ca_topic_score_gemma":0.0024647051,"teacher_disagreement_score":0.004616432,"about_ca_system_score_codex":0.0009133366,"about_ca_system_score_gemma":0.0010902502,"threshold_uncertainty_score":0.015443504},"labels":[],"label_agreement":null},{"id":"W2152974989","doi":"10.1109/tpwrs.2002.1007890","title":"Development of a hybrid model for electrical power spot prices","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Actua; Western University","funders":"","keywords":"Spot contract; Electricity; Electricity market; Electricity price; Economics; Econometrics; Stochastic modelling; Electricity pricing; Forward contract; Electricity generation; Electric power system; Electric power; Forward price; Computer science; Microeconomics; Power (physics); Financial economics; Engineering; Electrical engineering; Finance","score_opus":0.01820611343287834,"score_gpt":0.20982148705083412,"score_spread":0.19161537361795578,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152974989","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0103728995,0.00037753404,0.9721424,0.0005916517,0.000094879695,0.00004163036,0.00016061011,0.0001392657,0.01607912],"genre_scores_gemma":[0.7840319,0.0009973008,0.16875364,0.00028114297,0.0002203624,0.00045614608,0.00038737935,0.00017203104,0.044699956],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970645,0.00010253978,0.000014842793,0.000062609375,0.000085006024,0.00002856266],"domain_scores_gemma":[0.9995437,0.00025542013,0.000044090553,0.00003296346,0.000089887355,0.000033917775],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007185768,0.00057955313,0.0006743701,0.00046409958,0.00046000502,0.0016246375,0.0019361997,0.0019415285,0.007696295],"category_scores_gemma":[0.0016742775,0.00064330874,0.0010794387,0.00065167586,0.00091311906,0.0019590857,0.0013119564,0.0016185072,0.0010598833],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019275078,0.00002382464,0.0002819806,0.000028863054,0.000020426354,0.00014292507,0.000050477523,0.85688317,0.000839685,0.13535957,0.0010389606,0.0053107063],"study_design_scores_gemma":[0.0000038387143,0.0000040281975,0.000018246192,0.0000019360045,0.000001995927,0.000009965551,0.0000024108376,0.99072987,0.000045022876,0.008477652,0.00070211425,0.0000028966053],"about_ca_topic_score_codex":0.0055088378,"about_ca_topic_score_gemma":0.004794953,"teacher_disagreement_score":0.007696295,"about_ca_system_score_codex":0.0010526357,"about_ca_system_score_gemma":0.00095193187,"threshold_uncertainty_score":0.025746703},"labels":[],"label_agreement":null},{"id":"W2153268897","doi":"10.1109/tpwrs.2007.907375","title":"Hybrid Particle Swarm Optimization Approach for Solving the Discrete OPF Problem Considering the Valve Loading Effects","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":237,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Mathematical optimization; Particle swarm optimization; Sequential quadratic programming; Robustness (evolution); Electric power system; Quadratic programming; Computer science; Optimization problem; Mathematics; Power (physics)","score_opus":0.009270539254496592,"score_gpt":0.21157072149318967,"score_spread":0.2023001822386931,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153268897","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005687682,0.00013397005,0.9916146,0.00006080689,0.00003372212,0.000026579894,0.000011781019,0.000087991524,0.0023428071],"genre_scores_gemma":[0.45941356,0.00047584882,0.533849,0.00012211256,0.000118275995,0.00031051043,0.00014906653,0.00007444124,0.005487205],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99981767,0.000059578742,0.000009751002,0.00002915373,0.00006530715,0.000018558618],"domain_scores_gemma":[0.9997434,0.0001565747,0.000022757586,0.000018450179,0.00004772381,0.000011177063],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048702006,0.00074349064,0.0006597696,0.00040597722,0.00033921708,0.0006586004,0.00061676314,0.00082655094,0.0013886093],"category_scores_gemma":[0.00079329434,0.00028922758,0.0005554725,0.0003846221,0.00037976488,0.000463719,0.0004399513,0.0008472137,0.00025834018],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031586027,0.00003320697,0.00032965085,0.00006533882,0.000032778375,0.000058209396,0.000039303937,0.9528219,0.0018174761,0.006904473,0.00056796457,0.03729808],"study_design_scores_gemma":[0.0000063356115,0.000016887618,0.000042541673,0.000002308692,0.0000034435316,0.000008155392,0.0000036782058,0.9985562,0.00023141058,0.00064384803,0.00048335388,0.0000018805024],"about_ca_topic_score_codex":0.0039711003,"about_ca_topic_score_gemma":0.0028850357,"teacher_disagreement_score":0.0039711003,"about_ca_system_score_codex":0.00028293792,"about_ca_system_score_gemma":0.0006815513,"threshold_uncertainty_score":0.0078959465},"labels":[],"label_agreement":null},{"id":"W2154935705","doi":"10.1109/icsssm.2010.5530272","title":"Managing financial risks for natural gas-fired power plants","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Deregulation; Electricity; Valuation (finance); Natural gas; Electricity generation; Business; Environmental economics; Risk management; Electricity price; Natural gas prices; Electric power industry; Natural resource economics; Finance; Industrial organization; Power (physics); Economics; Engineering; Waste management; Electrical engineering; Market economy","score_opus":0.0073557094537843055,"score_gpt":0.2177103739311182,"score_spread":0.2103546644773339,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2154935705","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7818789,0.0022084694,0.20219794,0.0025560516,0.00005682314,0.00018053758,0.0001534832,0.00010585499,0.010661947],"genre_scores_gemma":[0.9928884,0.00038983888,0.0061824163,0.000017265365,0.000022071725,0.000018441266,0.000025034573,0.0000042468737,0.00045232626],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99901295,0.00051359733,0.00003913571,0.00007360177,0.00023248774,0.00012815862],"domain_scores_gemma":[0.9971855,0.001758308,0.0005763112,0.000070113725,0.00024119497,0.00016852788],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030726227,0.0009317225,0.0006184051,0.00091626396,0.00061853975,0.002234573,0.0006660196,0.000973764,0.0009757385],"category_scores_gemma":[0.0076319175,0.00033342052,0.00037988002,0.00058373256,0.0006893865,0.0028476461,0.001294746,0.0008715833,0.0000719186],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00078733877,0.0001724226,0.013222017,0.00012827544,0.00012009392,0.00088300795,0.00031408382,0.8671915,0.0036688247,0.035690643,0.0014332606,0.07638849],"study_design_scores_gemma":[0.000038916078,0.00019755281,0.0038371705,0.000034584267,0.000037253656,0.00018983799,0.00040720642,0.9392664,0.0019288784,0.052781515,0.0012415736,0.000039065373],"about_ca_topic_score_codex":0.0018897759,"about_ca_topic_score_gemma":0.0021523405,"teacher_disagreement_score":0.0030726227,"about_ca_system_score_codex":0.001377179,"about_ca_system_score_gemma":0.0010697009,"threshold_uncertainty_score":0.016249776},"labels":[],"label_agreement":null},{"id":"W2156474867","doi":"10.1109/tpwrs.2009.2023266","title":"Oligopolistic Competition of Gencos in Reactive Power Ancillary Service Provisions","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"AC power; Oligopoly; Electric power system; Procurement; Market power; Electricity market; Operator (biology); Incentive; Industrial organization; Business; Economics; Microeconomics; Computer science; Power (physics); Engineering; Cournot competition; Electricity; Electrical engineering; Monopoly; Voltage","score_opus":0.007386658032236702,"score_gpt":0.2075960731468953,"score_spread":0.2002094151146586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156474867","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76398987,0.00036431124,0.17333645,0.0011876262,0.00008884929,0.00016932774,0.00029230103,0.00012823101,0.060443077],"genre_scores_gemma":[0.99179924,0.0001027293,0.004344698,0.000056484925,0.0000055110163,0.00004809286,0.000013759467,0.000010610572,0.00361879],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991516,0.0005089598,0.000018823983,0.00008955737,0.00009381603,0.00013724176],"domain_scores_gemma":[0.99810565,0.001206239,0.00031616466,0.00008348299,0.00014778585,0.00014064593],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019693747,0.00053827954,0.0010201032,0.0005131911,0.00095946214,0.0021470697,0.0012114149,0.0017278903,0.005174786],"category_scores_gemma":[0.003724505,0.0006995285,0.00080593734,0.00080731243,0.0019529299,0.00189985,0.0009753652,0.0010623023,0.00035253604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001144832,0.00003748006,0.0006180911,0.00003406482,0.00001524784,0.0002575103,0.000050351548,0.94810325,0.00086841884,0.048561376,0.0002812015,0.0010585198],"study_design_scores_gemma":[0.000047741927,0.00006728853,0.0002373893,0.00000783323,0.000011442044,0.000028272967,0.00006390696,0.9877201,0.00020202782,0.011117557,0.00048136362,0.00001511096],"about_ca_topic_score_codex":0.012060459,"about_ca_topic_score_gemma":0.017963687,"teacher_disagreement_score":0.012060459,"about_ca_system_score_codex":0.002565794,"about_ca_system_score_gemma":0.002220444,"threshold_uncertainty_score":0.023980498},"labels":[],"label_agreement":null},{"id":"W2157253837","doi":"10.1109/pes.2011.6039776","title":"Estimating and visualizing the impact of wind forecast errors on system operations","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Wind power; Reliability (semiconductor); Electric power system; Computer science; Interval (graph theory); Reliability engineering; Term (time); Stability (learning theory); Visualization; Wind speed; Wind power forecasting; Power (physics); Meteorology; Data mining; Engineering; Mathematics; Machine learning","score_opus":0.023506188391811345,"score_gpt":0.2540745094050193,"score_spread":0.23056832101320796,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157253837","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4831344,0.00032874005,0.5080773,0.00032409417,0.000104875115,0.000061525796,0.0004748708,0.0038494759,0.003644673],"genre_scores_gemma":[0.86745226,0.00021686085,0.13125378,0.000012682617,0.00003150242,0.000024068686,0.00019694064,0.00013407611,0.00067769055],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997248,0.00008568313,0.000017144883,0.000029514793,0.00012249933,0.000020332382],"domain_scores_gemma":[0.9980242,0.0013296313,0.0001932837,0.00015428802,0.00022896734,0.00006954637],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000685952,0.00064834696,0.00031834442,0.0009670891,0.00016471969,0.0008259455,0.0002672111,0.00036923256,0.0013375067],"category_scores_gemma":[0.0041715456,0.00028694654,0.00025576173,0.00034847765,0.00015158963,0.00100843,0.00042375462,0.00055695506,0.00017187906],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007765032,0.00017474471,0.025826976,0.00030939863,0.00014172887,0.00056720263,0.00096661854,0.4683209,0.08949886,0.0034766356,0.003932302,0.40600812],"study_design_scores_gemma":[0.00001725295,0.0001330708,0.021395955,0.000027345386,0.000035242774,0.0001311455,0.00017290268,0.9534709,0.021353025,0.0015771828,0.0016407381,0.000045332567],"about_ca_topic_score_codex":0.0020628113,"about_ca_topic_score_gemma":0.0030102562,"teacher_disagreement_score":0.0020628113,"about_ca_system_score_codex":0.00016856997,"about_ca_system_score_gemma":0.00028663402,"threshold_uncertainty_score":0.0044744015},"labels":[],"label_agreement":null},{"id":"W2157542074","doi":"10.5539/mas.v5n3p111","title":"An Economic Based Approach for Optimal and Secure Reactive Power Provision in Deregulated Environments","year":2011,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"AC power; Electricity market; Schedule; Market clearing; Computer science; Electric power system; Mathematical optimization; Payment; Nonlinear programming; Electricity; Business; Voltage; Power (physics); Microeconomics; Economics; Nonlinear system; Electrical engineering; Engineering","score_opus":0.008433943738252079,"score_gpt":0.18876765750347949,"score_spread":0.18033371376522742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157542074","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004357571,0.000104140425,0.9909915,0.00018070827,0.000032307384,0.000060647504,0.000020069469,0.000052179053,0.0042009065],"genre_scores_gemma":[0.5478998,0.0005927059,0.4408343,0.0001751384,0.000110043184,0.00037237426,0.000106881926,0.00012929495,0.009779415],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993051,0.0002579399,0.000022083555,0.00009241055,0.0002446823,0.00007778788],"domain_scores_gemma":[0.9994646,0.00030029446,0.00007271535,0.00002371171,0.00011099119,0.00002765797],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014842934,0.0009669754,0.001084853,0.00090180716,0.0005809795,0.0014914044,0.0014442826,0.0011666651,0.0039618863],"category_scores_gemma":[0.0019150603,0.0006124387,0.0006261494,0.001020063,0.00090143,0.001338815,0.0010091917,0.001209566,0.000403222],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028151206,0.000034577075,0.00013039834,0.0000434753,0.000022856493,0.000048234924,0.000023414947,0.9397735,0.00078863854,0.037536804,0.00071380346,0.020856183],"study_design_scores_gemma":[0.0000075743496,0.000015496802,0.000037416754,0.0000037345153,0.000003496562,0.000012291898,0.000005540424,0.99368566,0.00019474037,0.005311964,0.00071853667,0.0000034398192],"about_ca_topic_score_codex":0.0028218185,"about_ca_topic_score_gemma":0.0036127814,"teacher_disagreement_score":0.0039618863,"about_ca_system_score_codex":0.0017611244,"about_ca_system_score_gemma":0.0019696755,"threshold_uncertainty_score":0.013253868},"labels":[],"label_agreement":null},{"id":"W2158376392","doi":"10.1287/opre.2013.1190","title":"Optimal Economic Dispatch and Risk Management of Thermal Power Plants in Deregulated Markets","year":2013,"lang":"en","type":"article","venue":"Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Mathematical optimization; Volatility (finance); Valuation (finance); Econometrics; Risk management; Economics; Spot contract; Computer science; Mathematics; Financial economics; Futures contract","score_opus":0.010377658184469951,"score_gpt":0.2581958759110573,"score_spread":0.24781821772658735,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2158376392","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032075293,0.00037240918,0.96325564,0.0002798656,0.000040378378,0.00007560707,0.00006807275,0.00009029439,0.0037424865],"genre_scores_gemma":[0.8486763,0.00054808997,0.14630547,0.000051124473,0.000073503135,0.00017733838,0.00010328589,0.000083601604,0.0039812173],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99903935,0.00051907694,0.000033641012,0.00012916437,0.00018536329,0.000093472845],"domain_scores_gemma":[0.9986792,0.0008410836,0.00019881855,0.000052636122,0.00015090276,0.00007723732],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027834359,0.0010168517,0.0017640768,0.00073447486,0.00054073834,0.0021093416,0.0013543688,0.0011121904,0.0017149249],"category_scores_gemma":[0.0047174087,0.0010339214,0.000733812,0.0006487809,0.0010915041,0.002082517,0.0011765328,0.001378476,0.0001743996],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012694783,0.00000772149,0.00006165065,0.000010500355,0.000009067034,0.000012413097,0.000013830429,0.9877309,0.00015988966,0.008665809,0.00008439353,0.0032310954],"study_design_scores_gemma":[0.000003177859,0.000004901929,0.000020417481,0.0000015774568,0.0000014206628,0.0000017099275,0.0000041759463,0.9959655,0.000059367136,0.0038403706,0.000095251344,0.0000021002922],"about_ca_topic_score_codex":0.0045567583,"about_ca_topic_score_gemma":0.0042783506,"teacher_disagreement_score":0.0045567583,"about_ca_system_score_codex":0.0021175807,"about_ca_system_score_gemma":0.0021714743,"threshold_uncertainty_score":0.01536417},"labels":[],"label_agreement":null},{"id":"W2158598170","doi":"10.1109/tpwrs.2005.851931","title":"One-Year Deferral Method for Estimating Avoided Transmission and Distribution Costs","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Manitoba Hydro","funders":"","keywords":"Deferral; Planner; Reliability engineering; Reduction (mathematics); Electric power system; Transmission (telecommunications); Computer science; Mathematical optimization; Control theory (sociology); Engineering; Power (physics); Mathematics; Economics; Control (management); Telecommunications","score_opus":0.013195480532484226,"score_gpt":0.2513885772609969,"score_spread":0.23819309672851266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2158598170","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03412935,0.00036822955,0.96244675,0.000047328373,0.000042930616,0.000052804953,0.0002830774,0.00027781934,0.002351668],"genre_scores_gemma":[0.5177276,0.00047068807,0.47717547,0.00004722737,0.000055120112,0.00017954342,0.0007629598,0.00011669484,0.0034646587],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99929655,0.00018883366,0.000032552885,0.00010490969,0.00032376585,0.00005341859],"domain_scores_gemma":[0.9970619,0.0015127258,0.00056772167,0.0002816178,0.00047869323,0.000097403536],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014845033,0.00058679143,0.00048540882,0.0022386229,0.00029736196,0.00061745103,0.0011626512,0.00041204246,0.001971752],"category_scores_gemma":[0.0070898393,0.00024870507,0.00048655094,0.0011207344,0.00030445942,0.0011150329,0.00038146516,0.00070946245,0.00035179962],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032448376,0.00011197368,0.01635564,0.00024440515,0.00014448867,0.00018540295,0.00018806042,0.58824575,0.0061181867,0.043832667,0.00407564,0.34017333],"study_design_scores_gemma":[0.000014677568,0.00010323932,0.0071639162,0.000026056925,0.000035433357,0.00023797558,0.000042491854,0.9747453,0.0049064895,0.00601844,0.0066293254,0.00007667384],"about_ca_topic_score_codex":0.0065272506,"about_ca_topic_score_gemma":0.0069364174,"teacher_disagreement_score":0.0065272506,"about_ca_system_score_codex":0.00066352816,"about_ca_system_score_gemma":0.00085976894,"threshold_uncertainty_score":0.012978494},"labels":[],"label_agreement":null},{"id":"W2158909241","doi":"","title":"Multiple objective reactive power planning using genetic algorithms","year":2007,"lang":"en","type":"dissertation","venue":"Memorial University Research Repository (Memorial University)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Memorial University of Newfoundland","keywords":"Mathematical optimization; Sorting; Multi-objective optimization; Computer science; Evolutionary algorithm; Heuristic; Optimization problem; Genetic algorithm; Pareto principle; Set (abstract data type); AC power; Power (physics); Algorithm; Mathematics","score_opus":0.02158838127200634,"score_gpt":0.2683543250199456,"score_spread":0.24676594374793925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2158909241","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017012773,0.0005173303,0.9687987,0.00020322937,0.000044182496,0.00012717843,0.000081757185,0.00051943335,0.0126954615],"genre_scores_gemma":[0.4936138,0.00068218244,0.49478444,0.0001151823,0.00004018297,0.0005198686,0.00023520237,0.00015511007,0.009854002],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996964,0.000114623384,0.000010737408,0.000045363166,0.000101425736,0.000031473275],"domain_scores_gemma":[0.9995042,0.0003359795,0.000051591953,0.000015636795,0.00007731003,0.00001524023],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061997306,0.0011389604,0.00085678394,0.0010528935,0.00043108276,0.0010068201,0.000859581,0.0009476037,0.0030127014],"category_scores_gemma":[0.0013755641,0.0006088043,0.0007260733,0.001092764,0.00054599147,0.0005625541,0.0004899055,0.0008064213,0.00042545283],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006929787,0.000009719671,0.00005096066,0.000011263429,0.000007951195,0.000014085612,0.000007679871,0.9881896,0.00018518517,0.0017459522,0.00018260178,0.009588141],"study_design_scores_gemma":[0.000007482097,0.000010088437,0.000025541485,0.000004585725,0.0000034821276,0.0000034191112,0.0000034824195,0.9975961,0.0001286947,0.0018512559,0.0003634344,0.0000026078912],"about_ca_topic_score_codex":0.011022482,"about_ca_topic_score_gemma":0.012208702,"teacher_disagreement_score":0.011022482,"about_ca_system_score_codex":0.0011643826,"about_ca_system_score_gemma":0.0013065279,"threshold_uncertainty_score":0.021916628},"labels":[],"label_agreement":null},{"id":"W2158930128","doi":"","title":"Probabilistic Model and Solution Algorithm for the Electricity Retailers in the Italian Market","year":2011,"lang":"en","type":"article","venue":"Algorithmic operations research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bidding; Simulated annealing; Electricity market; Computer science; Probabilistic logic; Electricity; Mathematical optimization; Portfolio; Algorithm; Economics; Mathematics; Artificial intelligence; Microeconomics; Finance; Engineering","score_opus":0.0691444894806862,"score_gpt":0.297606831795214,"score_spread":0.22846234231452783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2158930128","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01781211,0.0001843011,0.9772974,0.00037182707,0.000025145451,0.000062366125,0.00013432303,0.00019954875,0.0039128554],"genre_scores_gemma":[0.5548999,0.0004833162,0.43140575,0.00019923624,0.00007519659,0.0007460113,0.0006185583,0.0001684736,0.011403609],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995127,0.00020125844,0.000019451825,0.0000922077,0.000101310914,0.000073121846],"domain_scores_gemma":[0.9992242,0.0005402485,0.000076400174,0.000032922733,0.00009395456,0.00003230021],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010941874,0.00081593025,0.0011630206,0.0007559734,0.0006524231,0.0011323532,0.001531033,0.0016019066,0.0050561326],"category_scores_gemma":[0.0029765703,0.0006036326,0.0010872855,0.00098845,0.00070854125,0.0010949444,0.0012225052,0.0012858565,0.00055817823],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014954849,0.000009778732,0.00014112519,0.000017002367,0.000008837602,0.000016809605,0.000019500449,0.9847506,0.000098010714,0.00983476,0.0002978508,0.0047907988],"study_design_scores_gemma":[0.0000044839335,0.0000042488273,0.000028464388,0.0000016501652,0.0000018840466,0.000004350971,0.000003932056,0.9964,0.000030595173,0.0033325565,0.00018615038,0.0000016200086],"about_ca_topic_score_codex":0.013697921,"about_ca_topic_score_gemma":0.01110426,"teacher_disagreement_score":0.013697921,"about_ca_system_score_codex":0.0016025649,"about_ca_system_score_gemma":0.0021971024,"threshold_uncertainty_score":0.027236402},"labels":[],"label_agreement":null},{"id":"W2159530637","doi":"10.1109/tpwrs.2003.820709","title":"Coordination in Markets With Nonconvexities as a Mathematical Program With Equilibrium Constraints—Part II: Case Studies","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Mathematical optimization; Lagrange multiplier; Economic dispatch; Multiplier (economics); Electric power system; Power system simulation; Electricity market; Computer science; Market clearing; Marginal cost; Electricity; Mathematics; Economics; Power (physics)","score_opus":0.01130599141994049,"score_gpt":0.24032288325947163,"score_spread":0.22901689183953114,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159530637","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5860129,0.0006801022,0.3722381,0.0015637979,0.000061331724,0.00038019975,0.00040462156,0.00013005998,0.038528875],"genre_scores_gemma":[0.9292472,0.00029198214,0.06530838,0.000056402114,0.000026154583,0.00025927782,0.00008539164,0.00002700866,0.004698281],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992036,0.00051472615,0.000024660443,0.00006147296,0.00009644169,0.000099075645],"domain_scores_gemma":[0.995516,0.003831195,0.00027286276,0.00013501607,0.0001298889,0.00011515983],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020433501,0.00057409797,0.00093743694,0.00060428825,0.00087207626,0.0016316234,0.0012850949,0.0022301364,0.004840859],"category_scores_gemma":[0.0053601554,0.00044482434,0.0008582269,0.001448107,0.0017716535,0.0014476349,0.0013103898,0.0014121145,0.0001955212],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006633348,0.00014432907,0.00069022435,0.00007490021,0.000020937732,0.0005352292,0.00008668786,0.9302639,0.00023473817,0.06376561,0.00074544764,0.003371619],"study_design_scores_gemma":[0.00007810883,0.0000633127,0.00020783744,0.00001046031,0.00000886206,0.0000663826,0.00014563512,0.9850315,0.00032798888,0.012933553,0.0011169331,0.000009440112],"about_ca_topic_score_codex":0.0062321746,"about_ca_topic_score_gemma":0.0067372383,"teacher_disagreement_score":0.0062321746,"about_ca_system_score_codex":0.0015031892,"about_ca_system_score_gemma":0.0009045187,"threshold_uncertainty_score":0.016194284},"labels":[],"label_agreement":null},{"id":"W2159712218","doi":"10.1109/poweri.2006.1632633","title":"A spinning reserve market considering security and biddable reserve","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power India Conference","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Spinning; Procurement; Reserve requirement; Scheme (mathematics); Nature reserve; Computer science; Business; Engineering; Economics; Central bank; Mechanical engineering; Mathematics; Monetary economics; Marketing","score_opus":0.008215161649154226,"score_gpt":0.19755736223826328,"score_spread":0.18934220058910906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159712218","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050569598,0.00035489077,0.89003354,0.00093170675,0.00015707393,0.00013362832,0.00026734112,0.00025186763,0.05730024],"genre_scores_gemma":[0.88166064,0.0005087113,0.08644873,0.00012628178,0.00014246284,0.00019161862,0.00017737466,0.00013587938,0.030608242],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994593,0.00019038329,0.00001828756,0.00007971955,0.00017082976,0.00008150893],"domain_scores_gemma":[0.9996239,0.00013579655,0.00004440298,0.000037892547,0.00010173981,0.000056200046],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010252383,0.0006233087,0.0011264778,0.0004057273,0.0006159155,0.0027386958,0.0016702804,0.001552623,0.0070051714],"category_scores_gemma":[0.0013938334,0.0005290764,0.00091469334,0.00047399075,0.00094433647,0.004194806,0.00078140554,0.0011880073,0.0009512528],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004414236,0.000037134672,0.00013604302,0.00003289542,0.000017612989,0.00017067426,0.000040788,0.67696357,0.001363067,0.31558242,0.0011159107,0.0044957865],"study_design_scores_gemma":[0.000015292782,0.000020040885,0.000045076988,0.000003994447,0.000004276724,0.00003127273,0.000011925239,0.97319895,0.00013561887,0.024949796,0.0015746782,0.0000090787435],"about_ca_topic_score_codex":0.0055725086,"about_ca_topic_score_gemma":0.005721047,"teacher_disagreement_score":0.0070051714,"about_ca_system_score_codex":0.0012837016,"about_ca_system_score_gemma":0.00218642,"threshold_uncertainty_score":0.023434699},"labels":[],"label_agreement":null},{"id":"W2160541617","doi":"10.1504/ijgei.1997.063321","title":"Monitoring new technological developments in the electricity industry: an international perspective","year":2014,"lang":"en","type":"article","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Center for Interuniversity Research and Analysis on Organizations; Université du Québec à Montréal; Polytechnique Montréal","funders":"","keywords":"Delphi method; Electricity; Technological change; Perspective (graphical); Delphi; Industrial organization; Electric power industry; Mains electricity; Business; Engineering; Environmental economics; Economics; Computer science; Electrical engineering","score_opus":0.010710503574376598,"score_gpt":0.23390305947281415,"score_spread":0.22319255589843756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2160541617","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4827429,0.028210435,0.08713205,0.10727035,0.00047883036,0.0006856642,0.00023153065,0.0001103738,0.29313782],"genre_scores_gemma":[0.9474254,0.019320669,0.02603864,0.001972939,0.00015995464,0.00016574429,0.000082382525,0.000022678238,0.004811631],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9864,0.009906989,0.0005350689,0.00047259062,0.0019685861,0.0007168657],"domain_scores_gemma":[0.98614246,0.008644162,0.0018000567,0.00038653516,0.0025132156,0.0005135328],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022716561,0.0005766999,0.00027793716,0.003216935,0.0011705166,0.005360529,0.00072876405,0.0013847821,0.0022081672],"category_scores_gemma":[0.01481589,0.0002456555,0.0002760205,0.0038365163,0.0031810768,0.0069578593,0.001793063,0.0019550787,0.00020613472],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018045156,0.00081999117,0.09785887,0.0024430107,0.00012953275,0.001480772,0.10035025,0.006884749,0.01889874,0.21002461,0.009568875,0.5513602],"study_design_scores_gemma":[0.000029753928,0.0018415393,0.1343089,0.0046653165,0.00017202938,0.0023340147,0.4700249,0.008563516,0.014300594,0.04022817,0.32334602,0.00018533425],"about_ca_topic_score_codex":0.0019646594,"about_ca_topic_score_gemma":0.003396948,"teacher_disagreement_score":0.022716561,"about_ca_system_score_codex":0.0022756713,"about_ca_system_score_gemma":0.0032078307,"threshold_uncertainty_score":0.12013811},"labels":[],"label_agreement":null},{"id":"W2160807713","doi":"10.1109/tpwrs.2003.810998","title":"Competitive framework for procurement of interruptible load services","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":108,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Procurement; Electric power system; Computer science; Service (business); Load management; Reliability engineering; Electricity market; Operations research; Load factor; Electricity; Power (physics); Business; Engineering; Electrical engineering","score_opus":0.010731505783665524,"score_gpt":0.2308834690714656,"score_spread":0.22015196328780007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2160807713","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043799732,0.0022591238,0.70567447,0.0045485785,0.000340136,0.0003323645,0.00055846095,0.0002800477,0.24220699],"genre_scores_gemma":[0.8885255,0.0023332485,0.051563617,0.00044133406,0.0003390456,0.00045818195,0.00019450311,0.00012470395,0.056019865],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99783474,0.00086511136,0.00005561842,0.00031415193,0.0005260609,0.0004042845],"domain_scores_gemma":[0.9982419,0.00090986205,0.00023708431,0.00008694157,0.00029043743,0.00023382372],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031167236,0.0013568327,0.001489867,0.0013245682,0.0014912729,0.0058947476,0.0029871103,0.0039099716,0.021087116],"category_scores_gemma":[0.0048533995,0.0010385534,0.0012734011,0.0014328005,0.0033773135,0.005776389,0.0017000062,0.0031573586,0.0018164122],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003168579,0.00004919823,0.00011359897,0.000055165277,0.000011920389,0.0001648839,0.00006638439,0.09554683,0.00031960575,0.8983112,0.0016337687,0.0036957767],"study_design_scores_gemma":[0.00007535313,0.00012278822,0.00024370474,0.00005007738,0.00002330125,0.00015800713,0.00016474295,0.48349312,0.00019164062,0.4992585,0.016155126,0.00006371007],"about_ca_topic_score_codex":0.008661795,"about_ca_topic_score_gemma":0.008257396,"teacher_disagreement_score":0.021087116,"about_ca_system_score_codex":0.005511166,"about_ca_system_score_gemma":0.0040501677,"threshold_uncertainty_score":0.07054341},"labels":[],"label_agreement":null},{"id":"W2160808904","doi":"10.1109/pes.2003.1270386","title":"Closed-form solution to calculate generator contributions to loads and line flows in an open access market","year":2004,"lang":"en","type":"article","venue":"2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Tracing; Computation; Computer science; Generator (circuit theory); Electric power transmission; Mathematical optimization; Electric power system; Linear programming; Transmission line; Transmission (telecommunications); Line (geometry); Power (physics); Telecommunications; Electrical engineering; Mathematics; Engineering; Algorithm","score_opus":0.01174616760905839,"score_gpt":0.2805061016743096,"score_spread":0.2687599340652512,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2160808904","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012145,0.00014571093,0.9817058,0.00021317555,0.000039604845,0.00006951755,0.00008264535,0.00029578607,0.005302839],"genre_scores_gemma":[0.4802041,0.0005059695,0.50008494,0.00023434503,0.0001163877,0.0005945452,0.00035932526,0.00038779477,0.017512638],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9994686,0.0001812574,0.000020626003,0.000067120585,0.00019251263,0.00006984391],"domain_scores_gemma":[0.9962985,0.002738504,0.00018656843,0.00012250636,0.0005721394,0.00008181925],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026293183,0.00097423914,0.001023155,0.001005833,0.0006461245,0.0018554891,0.0012116584,0.001995513,0.00842425],"category_scores_gemma":[0.009436133,0.00069354335,0.0005112313,0.0010650688,0.00095397513,0.0017420149,0.001028495,0.0013531613,0.0012372066],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030317935,0.000068025074,0.00029569378,0.0000642378,0.000012778912,0.00008197435,0.000058342677,0.94461584,0.00061405735,0.02990255,0.0016331009,0.022623163],"study_design_scores_gemma":[0.000010577744,0.000009750783,0.000048760612,0.000004891998,0.0000026960222,0.0000141189,0.000016248337,0.9903266,0.00020256444,0.008835269,0.00052524183,0.0000032506932],"about_ca_topic_score_codex":0.0056725056,"about_ca_topic_score_gemma":0.0091079455,"teacher_disagreement_score":0.00842425,"about_ca_system_score_codex":0.0011727811,"about_ca_system_score_gemma":0.0023661181,"threshold_uncertainty_score":0.02818191},"labels":[],"label_agreement":null},{"id":"W2161495209","doi":"10.29228/mjes.93","title":"A COMPARISON OF ELECTRICITY INDUSTRY REGULATION AND RESTRUCTURING: GREECE AND TURKEY","year":2015,"lang":"tr","type":"article","venue":"Marmara Avrupa araştırmaları dergisi/Marmara Üniversitesi Avrupa Araştırmaları Enstitüsü Avrupa araştırmaları dergisi","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Héma-Québec","funders":"","keywords":"Restructuring; Legislation; Turkish; Electricity; Electric power industry; Business; Politics; Process (computing); Industrial organization; Face (sociological concept); Economic policy; Market economy; Economic system; Economy; Economics; Political science; Finance; Engineering; Computer science","score_opus":0.02228787412751768,"score_gpt":0.2555096896517992,"score_spread":0.23322181552428153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2161495209","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98326886,0.00058152137,0.0002690065,0.00034111022,0.00001371264,0.00001030301,0.00014993914,0.000011318113,0.0153542515],"genre_scores_gemma":[0.99819547,0.0002465212,0.000080982456,0.00007243536,0.000004480812,0.000004317855,0.00019275649,0.000004266387,0.0011988052],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9986563,0.0002757588,0.00012194016,0.00022202349,0.0004522429,0.00027174546],"domain_scores_gemma":[0.9986451,0.00033463005,0.0005472799,0.000091438626,0.00028911963,0.00009233587],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009226367,0.000117164425,0.0002217872,0.0011303837,0.00028411485,0.0013072671,0.00028846477,0.0005947508,0.0012728864],"category_scores_gemma":[0.0019237457,0.00010317411,0.00025627212,0.0018820182,0.00081481104,0.00063835434,0.000821708,0.0004100128,0.00017365222],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001631359,0.00043817618,0.5866769,0.00096520886,0.0004056311,0.008883411,0.034312237,0.027027363,0.016573139,0.07461703,0.007611039,0.24085855],"study_design_scores_gemma":[0.000026761081,0.00029815378,0.9404168,0.00012606243,0.000040181498,0.0009874274,0.015897622,0.0017720126,0.0024615733,0.0011100188,0.03681012,0.000053230717],"about_ca_topic_score_codex":0.012595725,"about_ca_topic_score_gemma":0.011542031,"teacher_disagreement_score":0.012595725,"about_ca_system_score_codex":0.0020829826,"about_ca_system_score_gemma":0.0013890159,"threshold_uncertainty_score":0.025044799},"labels":[],"label_agreement":null},{"id":"W2162703984","doi":"10.1109/psce.2009.4840193","title":"A novel approach to disco planning in electricity markets: Mathematical model","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Electricity market; Variety (cybernetics); Computer science; Capacity planning; Work (physics); Function (biology); Power flow; Service (business); Term (time); Operations research; Electric power system; Power (physics); Environmental economics; Business; Economics; Engineering; Electrical engineering; Marketing","score_opus":0.014479096685675177,"score_gpt":0.22573945676785806,"score_spread":0.21126036008218288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162703984","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019553623,0.00038160797,0.9842308,0.00054710876,0.00006195896,0.00004179204,0.000093634764,0.000040148294,0.012647592],"genre_scores_gemma":[0.43771484,0.003743791,0.5190535,0.0006928726,0.0005266858,0.00078656984,0.00029361236,0.00019780087,0.03699032],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995828,0.00014793019,0.000016813223,0.00006743252,0.00014075244,0.00004426029],"domain_scores_gemma":[0.9994679,0.0003260547,0.00006172782,0.00002953739,0.00007981868,0.000035009813],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011219521,0.00090522657,0.0009732595,0.00071195734,0.0004884867,0.0017629813,0.0019672774,0.0013632502,0.004801504],"category_scores_gemma":[0.0020693177,0.0006025382,0.0010508883,0.001121615,0.001230581,0.002267979,0.0012439425,0.001904605,0.0007737609],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010801187,0.000024514546,0.00009325402,0.00006443981,0.000012119249,0.000078910474,0.000038970047,0.77765745,0.0002939694,0.211442,0.0017604184,0.008523202],"study_design_scores_gemma":[0.0000075312987,0.000012016391,0.00002545542,0.00001051765,0.0000044073445,0.000023511786,0.000009171532,0.9465815,0.000093818635,0.04983559,0.0033896263,0.000006831178],"about_ca_topic_score_codex":0.003724116,"about_ca_topic_score_gemma":0.00331176,"teacher_disagreement_score":0.004801504,"about_ca_system_score_codex":0.0015446778,"about_ca_system_score_gemma":0.001838646,"threshold_uncertainty_score":0.016062677},"labels":[],"label_agreement":null},{"id":"W2163826395","doi":"10.1109/tla.2011.6030982","title":"An Analytical Approach to the Economical Assessment of Wind Distributed Generators Penetration in Electric Power Systems with Centralized Thermal Generation","year":2011,"lang":"en","type":"article","venue":"IEEE Latin America Transactions","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Distributed generation; Electric power system; Penetration (warfare); Wind generator; Electricity generation; Engineering; Automotive engineering; Electric power; Computer science; Control engineering; Electrical engineering; Reliability engineering; Renewable energy; Power (physics); Operations research","score_opus":0.019257508902055166,"score_gpt":0.22695479314529263,"score_spread":0.20769728424323747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2163826395","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004630469,0.00030480756,0.9871055,0.00014703561,0.000043254742,0.000026613883,0.00003104057,0.00004656041,0.0076647187],"genre_scores_gemma":[0.68395495,0.0030711675,0.30302674,0.0001212469,0.00038465616,0.00026743332,0.00012588831,0.000111196634,0.008936784],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994466,0.00019545603,0.00001651059,0.00003562616,0.00026642982,0.000039412535],"domain_scores_gemma":[0.9993474,0.0003728921,0.000077432705,0.00004354423,0.00014123705,0.000017398874],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008010654,0.0011378196,0.00063368323,0.0014646754,0.00044307738,0.0009518122,0.0008025435,0.00056438876,0.0018766454],"category_scores_gemma":[0.0028093944,0.0004037499,0.0007620281,0.0009115761,0.00079198455,0.0010817477,0.00065909995,0.00084824604,0.0003588413],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018546458,0.0000647277,0.00030290615,0.00015179643,0.00003509973,0.00020061374,0.000064770364,0.82594633,0.0044970545,0.11719364,0.0011418168,0.0503826],"study_design_scores_gemma":[0.0000042439283,0.00003595778,0.00016075831,0.000029079283,0.00001685635,0.00009958578,0.000036812704,0.957657,0.0011643246,0.03769027,0.0030926617,0.000012359803],"about_ca_topic_score_codex":0.0009850013,"about_ca_topic_score_gemma":0.001590813,"teacher_disagreement_score":0.0018766454,"about_ca_system_score_codex":0.0007738187,"about_ca_system_score_gemma":0.0011596306,"threshold_uncertainty_score":0.006278038},"labels":[],"label_agreement":null},{"id":"W2164802766","doi":"10.1109/tpwrs.2004.831699","title":"Optimal Investment Planning for Distributed Generation in a Competitive Electricity Market","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":528,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity market; Investment (military); Sizing; Electricity; Distributed generation; Capacity planning; Heuristic; Compensation (psychology); Operations research; Computer science; Mathematical optimization; Business; Microeconomics; Economics; Engineering; Operations management","score_opus":0.012919199215162259,"score_gpt":0.22189822387450853,"score_spread":0.20897902465934626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2164802766","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.122983985,0.0011380882,0.85243636,0.00089160196,0.00008418946,0.00014921835,0.00023923494,0.00019706273,0.02188034],"genre_scores_gemma":[0.90760815,0.00046692768,0.088000864,0.00006470589,0.00003588757,0.00014814873,0.00015088568,0.000056546847,0.0034678713],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994355,0.0002948579,0.000010844935,0.000047958278,0.00011089443,0.00009990008],"domain_scores_gemma":[0.9994198,0.00040485372,0.000052562496,0.00001706544,0.00005544685,0.000050296167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009957094,0.00086129166,0.0011134015,0.0006791956,0.0003750197,0.0013312161,0.00076799974,0.0009364202,0.0023790717],"category_scores_gemma":[0.001714289,0.00076397014,0.00039770416,0.0008004176,0.0009165508,0.001221627,0.0005329372,0.00077233725,0.00021439351],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029601217,0.000016554466,0.00007754362,0.000016982198,0.000007712422,0.000031651703,0.000012691102,0.98174584,0.00013461067,0.013667937,0.00038714762,0.0038717384],"study_design_scores_gemma":[0.000010297113,0.000008880155,0.000022169508,0.0000020119078,0.0000022560832,0.000004209941,0.000008276623,0.9947206,0.000055699547,0.004938935,0.00022457604,0.0000020959433],"about_ca_topic_score_codex":0.0067785196,"about_ca_topic_score_gemma":0.010224499,"teacher_disagreement_score":0.0067785196,"about_ca_system_score_codex":0.00196636,"about_ca_system_score_gemma":0.0020181867,"threshold_uncertainty_score":0.014266968},"labels":[],"label_agreement":null},{"id":"W2165320540","doi":"10.1109/tpwrs.2009.2038060","title":"Coordination of Investor-Owned DG Capacity Growth in Distribution Systems","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Schematic; Investment (military); Distributed generation; Distribution (mathematics); Function (biology); Selection (genetic algorithm); Industrial organization; Unit (ring theory); Business; Computer science; Microeconomics; Operations research; Risk analysis (engineering); Economics; Engineering; Renewable energy; Electrical engineering; Mathematics","score_opus":0.00773446605784893,"score_gpt":0.18666072654525565,"score_spread":0.1789262604874067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2165320540","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12289824,0.00024764464,0.8459899,0.0009421753,0.00009011631,0.00027321957,0.000064306434,0.00039114847,0.029103171],"genre_scores_gemma":[0.9542149,0.000099886085,0.042054757,0.000040127205,0.00003358507,0.00010907559,0.000029238437,0.000034707005,0.003383761],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9956371,0.0024360665,0.00017314721,0.00054138445,0.00080975326,0.00040263313],"domain_scores_gemma":[0.9965061,0.0017385596,0.00056672597,0.00042518048,0.00046887354,0.0002945156],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0059271767,0.00040054042,0.0005637944,0.0006172751,0.00068729813,0.0028725062,0.001549607,0.00086769566,0.0023530861],"category_scores_gemma":[0.009103647,0.00039991416,0.00025752324,0.00056480634,0.0011404277,0.0022536297,0.0016897178,0.0008374562,0.00027021547],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052332773,0.00012146754,0.0024587412,0.000110607056,0.00007000238,0.00043102997,0.0008099964,0.56835824,0.011273299,0.27106497,0.0027575921,0.14202069],"study_design_scores_gemma":[0.00013659633,0.00018540336,0.0013446487,0.00002455808,0.000036858448,0.00010078159,0.00030119834,0.8854204,0.009695621,0.08873452,0.013976329,0.000043088687],"about_ca_topic_score_codex":0.0013287296,"about_ca_topic_score_gemma":0.0022610312,"teacher_disagreement_score":0.0059271767,"about_ca_system_score_codex":0.0021996682,"about_ca_system_score_gemma":0.0021756566,"threshold_uncertainty_score":0.03134626},"labels":[],"label_agreement":null},{"id":"W2165723336","doi":"10.1109/pes.2006.1708860","title":"Localized reactive power markets using the concept of voltage control areas","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"AC power; Voltage optimisation; Volt-ampere reactive; Voltage; Power control; Control (management); Electric power system; Power (physics); Voltage regulation; Computer science; Control theory (sociology); Electrical engineering; Engineering; Physics","score_opus":0.00363905546666036,"score_gpt":0.18733620088808736,"score_spread":0.183697145421427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2165723336","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021211995,0.0003436148,0.9638227,0.0001742586,0.000045682064,0.000078422054,0.000028037843,0.000098895114,0.014196311],"genre_scores_gemma":[0.8569158,0.00078542926,0.13169089,0.00013348176,0.00015869428,0.00029735718,0.00006688001,0.00008015153,0.009871258],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937916,0.0002476619,0.000016413542,0.00013684704,0.00016200743,0.0000578592],"domain_scores_gemma":[0.99946684,0.00026351833,0.000082785715,0.00006686172,0.00007619627,0.000043745073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000814014,0.0006520747,0.000617808,0.00024507372,0.0003650469,0.0016547912,0.0010590244,0.0006158339,0.009605786],"category_scores_gemma":[0.0012412037,0.00038150605,0.0007057828,0.000534434,0.0012814184,0.0023150404,0.0008937198,0.0009600971,0.00058392953],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009446351,0.000075159325,0.00031334732,0.0001313078,0.000047425638,0.00020651607,0.0000728818,0.4389371,0.0073820213,0.5115938,0.0020324152,0.03911362],"study_design_scores_gemma":[0.000078880075,0.00031367844,0.00018410209,0.00002106587,0.000045297016,0.00018268684,0.000045145815,0.86937904,0.0026289336,0.117686816,0.009407218,0.000027118185],"about_ca_topic_score_codex":0.00070489454,"about_ca_topic_score_gemma":0.0009957094,"teacher_disagreement_score":0.009605786,"about_ca_system_score_codex":0.0010916158,"about_ca_system_score_gemma":0.0008205461,"threshold_uncertainty_score":0.032134593},"labels":[],"label_agreement":null},{"id":"W2166154009","doi":"10.1109/tpwrs.2008.926401","title":"Determination of Network Rental Components in a Competitive Electricity Market","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Renting; Tracing; Electricity market; Revenue; Mathematical optimization; Constraint (computer-aided design); Electricity; Electric power transmission; Economic surplus; Economics; Computer science; Engineering; Mathematics; Finance","score_opus":0.011740085809468925,"score_gpt":0.19659923373462854,"score_spread":0.18485914792515962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166154009","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38839638,0.00048902055,0.5743344,0.0006229689,0.00004034958,0.00022468495,0.0003498787,0.0001926587,0.03534977],"genre_scores_gemma":[0.96003443,0.00016319103,0.03625465,0.000020275595,0.000013445309,0.00005848882,0.000062560284,0.000060819733,0.0033321637],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994536,0.00020759105,0.000021374655,0.000081441176,0.00014898034,0.00008712077],"domain_scores_gemma":[0.9984346,0.000991841,0.00020491643,0.00009364497,0.00019536004,0.0000796565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013205293,0.0006269825,0.0008305316,0.0009000148,0.0005778006,0.0021666938,0.0012064363,0.0009067329,0.0037394431],"category_scores_gemma":[0.0074863574,0.0009045489,0.00073179865,0.0006105225,0.0012784104,0.002872073,0.0009787924,0.00092774286,0.00034032066],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013737477,0.00006009133,0.0034147413,0.00011460633,0.000028843304,0.0005279469,0.0001382125,0.75578153,0.0034389955,0.2197858,0.0011785761,0.01539328],"study_design_scores_gemma":[0.0000044290446,0.0000075107864,0.00048059158,0.0000035181272,0.0000033502208,0.00004409546,0.000023633298,0.9890542,0.0003040069,0.009831744,0.00023365684,0.000009254457],"about_ca_topic_score_codex":0.0073616295,"about_ca_topic_score_gemma":0.0076629077,"teacher_disagreement_score":0.0073616295,"about_ca_system_score_codex":0.0026226132,"about_ca_system_score_gemma":0.0012962205,"threshold_uncertainty_score":0.019028544},"labels":[],"label_agreement":null},{"id":"W2166443853","doi":"10.1109/ccece.2008.4564592","title":"Optimal allocation of spinning reserve in a restructured power system using particle swarm optimization","year":2008,"lang":"en","type":"article","venue":"Conference proceedings - Canadian Conference on Electrical and Computer Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Spinning; Particle swarm optimization; Electric power system; Probabilistic logic; Reliability (semiconductor); Genetic algorithm; Computer science; Mathematical optimization; Reliability engineering; Power (physics); Engineering; Mathematics; Algorithm","score_opus":0.01565606345648153,"score_gpt":0.18914062289888017,"score_spread":0.17348455944239866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166443853","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2431233,0.00040167107,0.74853784,0.0003134215,0.000067002504,0.00010546655,0.00006572711,0.00033445706,0.007051087],"genre_scores_gemma":[0.95209366,0.00011861454,0.04608658,0.000027672271,0.000014265128,0.0000618772,0.000040644856,0.000019880525,0.0015367827],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998472,0.000059832408,0.000009324599,0.000028096048,0.000031549793,0.00002402316],"domain_scores_gemma":[0.9997744,0.000111636095,0.000047202306,0.000013642551,0.00003584324,0.00001721458],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005475737,0.00054116605,0.0007010174,0.00043107104,0.00030914252,0.000892096,0.00040371297,0.0006431108,0.00075639604],"category_scores_gemma":[0.00088284945,0.0003804733,0.0003300753,0.00029799284,0.00048423873,0.0005641728,0.00029095006,0.00042138685,0.00012152856],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025384123,0.000012758329,0.00013305507,0.000008052395,0.000010188399,0.000025404368,0.000012890476,0.99353033,0.00064751896,0.0008708784,0.00011559208,0.0046079354],"study_design_scores_gemma":[0.0000072320845,0.000014175462,0.00005251591,0.0000010167151,0.000002901934,0.0000020182613,0.0000029890275,0.999418,0.00010566038,0.00033628612,0.000055746423,0.0000013217691],"about_ca_topic_score_codex":0.0060505066,"about_ca_topic_score_gemma":0.005488822,"teacher_disagreement_score":0.0060505066,"about_ca_system_score_codex":0.00063815387,"about_ca_system_score_gemma":0.0007045594,"threshold_uncertainty_score":0.012030542},"labels":[],"label_agreement":null},{"id":"W2166464259","doi":"10.1109/tpwrs.2010.2048345","title":"Assessing the Yearly Impact of Wind Power Through a New Hybrid Deterministic/Stochastic Unit Commitment","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Wind power; Mathematical optimization; Probabilistic logic; Electric power system; Probability density function; Schedule; Residual; Economic dispatch; Reliability engineering; Computer science; Operations research; Power (physics); Engineering; Mathematics; Algorithm; Electrical engineering; Statistics","score_opus":0.018030964606955666,"score_gpt":0.27825378883674995,"score_spread":0.26022282422979426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166464259","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18475711,0.00019035695,0.8042654,0.0003177218,0.0000619674,0.00012205055,0.0005040185,0.00031305727,0.009468245],"genre_scores_gemma":[0.9225002,0.00007552152,0.075991996,0.000045019387,0.000019345136,0.00006789858,0.00027688028,0.000045463607,0.0009776641],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918205,0.00040165507,0.00003517712,0.00009053409,0.00023823981,0.000052340078],"domain_scores_gemma":[0.99856585,0.0008794014,0.00017865747,0.00017045827,0.00014860858,0.00005705527],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014294098,0.00050622754,0.00053977437,0.00042133944,0.00022920078,0.0010445755,0.0010394794,0.00051957,0.0012905096],"category_scores_gemma":[0.0035512403,0.00046458998,0.00043961598,0.0005940155,0.00030470014,0.0009523483,0.0006303978,0.00066943176,0.00010474215],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019121253,0.000009291108,0.0005105614,0.0000076262963,0.000016757585,0.000013201991,0.000003638766,0.9934496,0.0001927853,0.0018744246,0.000092427006,0.0038106604],"study_design_scores_gemma":[0.000002901579,0.000011801823,0.00015746392,8.838773e-7,0.0000029363139,0.0000044573753,0.0000016823443,0.9991346,0.00011858023,0.00048116272,0.00008127423,0.0000022746751],"about_ca_topic_score_codex":0.005289627,"about_ca_topic_score_gemma":0.006538351,"teacher_disagreement_score":0.005289627,"about_ca_system_score_codex":0.0007340977,"about_ca_system_score_gemma":0.0008860585,"threshold_uncertainty_score":0.010517657},"labels":[],"label_agreement":null},{"id":"W2166665348","doi":"10.1109/psce.2006.296400","title":"Analysis of Market Power Using an AC Transmission System","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Oligopoly; AC power; Node (physics); Competition (biology); Electric power system; Computer science; Operator (biology); Market power; Transmission (telecommunications); Set (abstract data type); Power flow; Transmission network; Nonlinear system; Mathematical optimization; Power (physics); Power-flow study; Transmission system; Electric power transmission; Voltage; Engineering; Mathematical economics; Economics; Microeconomics; Electrical engineering; Mathematics; Telecommunications; Cournot competition","score_opus":0.004967826262790539,"score_gpt":0.19324196032391017,"score_spread":0.18827413406111962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166665348","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.51111805,0.0013752611,0.3495496,0.0016235915,0.00009025266,0.00015615692,0.00064211746,0.00035766122,0.13508737],"genre_scores_gemma":[0.9896908,0.00027275464,0.0041651423,0.00002495709,0.000026135605,0.000033651115,0.00004061101,0.000025397196,0.0057205176],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997863,0.00010176139,0.0000067244487,0.000026530251,0.00005476198,0.000024061183],"domain_scores_gemma":[0.99956495,0.00026643567,0.000058852682,0.00001460916,0.000074246855,0.000020949556],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040672292,0.0005094283,0.00043544933,0.00048721884,0.00047363306,0.0014080737,0.0005970562,0.0008271351,0.006581623],"category_scores_gemma":[0.0014897996,0.00028381814,0.00029837576,0.00090405595,0.0007003119,0.0012095637,0.0004407512,0.00047406755,0.0002650981],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003342449,0.00001828321,0.0003921293,0.000043099477,0.000014335637,0.00022455183,0.00003633305,0.96723825,0.0007666957,0.027629564,0.00045575312,0.0031476251],"study_design_scores_gemma":[0.000005197087,0.00001266655,0.0001603793,0.0000023749067,0.0000034078519,0.000014687192,0.000016183267,0.9967662,0.00005613609,0.0026879222,0.0002722787,0.0000026491825],"about_ca_topic_score_codex":0.014788479,"about_ca_topic_score_gemma":0.007951701,"teacher_disagreement_score":0.014788479,"about_ca_system_score_codex":0.0010179626,"about_ca_system_score_gemma":0.00054344273,"threshold_uncertainty_score":0.029404819},"labels":[],"label_agreement":null},{"id":"W2167141053","doi":"10.1109/naps.2008.5307355","title":"Fuzzy economic dispatch and spinning reserve allocation using evolutionary programming","year":2008,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Economic dispatch; Mathematical optimization; Fuzzy logic; Electricity market; Computer science; Evolutionary programming; Fuzzy set; Electric power system; Point (geometry); Electricity generation; Evolutionary algorithm; Linear programming; Electricity; Power (physics); Mathematics; Engineering","score_opus":0.016151771683969883,"score_gpt":0.21650301833966135,"score_spread":0.20035124665569146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167141053","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05260852,0.0006652417,0.9368731,0.0003570734,0.00006277653,0.000041311054,0.00003303268,0.00004993749,0.009308983],"genre_scores_gemma":[0.8282827,0.00065993663,0.1636656,0.000063327665,0.00007012897,0.00011433178,0.000051862655,0.000026056208,0.007066023],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997179,0.00013993315,0.000008619047,0.000024491892,0.00008536632,0.00002373754],"domain_scores_gemma":[0.99980885,0.00010991709,0.000026135598,0.000009480339,0.000032196545,0.000013467753],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006665457,0.00043855156,0.00056594575,0.00034996518,0.0002832375,0.0008512423,0.0005357747,0.00087087264,0.0011860218],"category_scores_gemma":[0.0012615096,0.00024906886,0.0003762846,0.00071348355,0.00057910616,0.000681561,0.00040014452,0.000520516,0.000109192944],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016633749,0.000013380155,0.00010228397,0.000012960158,0.000012667255,0.000046517172,0.000012780675,0.96611315,0.0003760111,0.022116315,0.00017869154,0.010998488],"study_design_scores_gemma":[0.0000049657015,0.000004745596,0.00004983941,0.0000016200461,0.0000015634024,0.000006034766,0.00000271898,0.9949427,0.000083273546,0.0046297247,0.0002707156,0.0000020487369],"about_ca_topic_score_codex":0.003388611,"about_ca_topic_score_gemma":0.0029467987,"teacher_disagreement_score":0.003388611,"about_ca_system_score_codex":0.0006429686,"about_ca_system_score_gemma":0.00054532214,"threshold_uncertainty_score":0.0067377687},"labels":[],"label_agreement":null},{"id":"W2167867269","doi":"10.1109/pess.2000.867602","title":"Short-term scheduling of inter-utilities power-exchange in re-structured markets","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Universidad de Chile","keywords":"Computer science; Scheduling (production processes); Electric power system; Economic dispatch; Mathematical optimization; Energy exchange; Nonlinear programming; Nonlinear system; Power (physics); Distributed computing","score_opus":0.013960348027851274,"score_gpt":0.20846682694481727,"score_spread":0.19450647891696599,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167867269","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2574508,0.00017407778,0.73634845,0.00017826863,0.000046695826,0.0002106526,0.000062047315,0.00017791332,0.005351064],"genre_scores_gemma":[0.9642295,0.00006652005,0.0339052,0.000022734328,0.000015455722,0.000081153674,0.000060432183,0.000035310142,0.0015836586],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99895966,0.0005173894,0.000037329457,0.00016429143,0.0001447641,0.00017661756],"domain_scores_gemma":[0.99834347,0.0008501879,0.00026943936,0.00013077162,0.00021696276,0.0001891349],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023583511,0.0005260672,0.0010660269,0.00022778232,0.0004114345,0.0011557769,0.0011802786,0.0008218826,0.0029122073],"category_scores_gemma":[0.0042501814,0.0003880783,0.00032487907,0.00040387578,0.0006694717,0.001980053,0.00071628054,0.0012113837,0.00030445476],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025180788,0.00012051849,0.00031652383,0.000029058618,0.000017497476,0.00011879654,0.00006973266,0.9592204,0.00240226,0.019273661,0.0005151932,0.017664438],"study_design_scores_gemma":[0.000052198786,0.00012170633,0.00017708083,0.000003032845,0.000004713202,0.000014700151,0.000038507696,0.9887093,0.000843634,0.009649928,0.0003784152,0.0000068447707],"about_ca_topic_score_codex":0.0018115693,"about_ca_topic_score_gemma":0.0020285181,"teacher_disagreement_score":0.0029122073,"about_ca_system_score_codex":0.00092380005,"about_ca_system_score_gemma":0.0014533838,"threshold_uncertainty_score":0.012472272},"labels":[],"label_agreement":null},{"id":"W2168145151","doi":"10.1080/15325008.2012.694969","title":"Stochastic Unit Commitment with Wind Generation Penetration","year":2012,"lang":"en","type":"article","venue":"Electric Power Components and Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Power system simulation; Wind power; Clearance; Electricity market; Electricity; Electric power system; Electricity generation; Unit (ring theory); Monte Carlo method; Economic dispatch; Mathematical optimization; Wind speed; Computer science; Operations research; Engineering; Power (physics); Mathematics; Electrical engineering; Meteorology","score_opus":0.021684785670329765,"score_gpt":0.20601983489172526,"score_spread":0.18433504922139549,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168145151","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028459448,0.00013182833,0.96496826,0.00025164717,0.00004904362,0.00007836954,0.00020757358,0.0003905608,0.0054633045],"genre_scores_gemma":[0.836829,0.00016514485,0.15738024,0.00015102807,0.000050470917,0.00028712698,0.00048137532,0.00013829829,0.0045173136],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99803954,0.00108269,0.000062595835,0.00025108873,0.00043065267,0.00013340526],"domain_scores_gemma":[0.99733365,0.001829938,0.00022869415,0.00024344087,0.00029845838,0.00006581871],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001981454,0.0008960403,0.0014595066,0.0005619311,0.00038482863,0.0012183157,0.0015830623,0.00081588636,0.004338831],"category_scores_gemma":[0.0058058975,0.0007777784,0.0006505564,0.0014057839,0.0005889845,0.0012668034,0.000833089,0.0014125777,0.0005524039],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000151131335,0.000006686768,0.00006168579,0.0000057909565,0.000015491582,0.0000103015645,0.0000028299762,0.99361813,0.000057772682,0.0031346933,0.00018867984,0.0028827987],"study_design_scores_gemma":[0.000003243661,0.0000034508182,0.00001393263,0.0000010940201,0.0000013306652,0.0000023702926,5.3611467e-7,0.99844617,0.000037823043,0.0014195469,0.00006947784,0.0000011672613],"about_ca_topic_score_codex":0.0048303106,"about_ca_topic_score_gemma":0.004756696,"teacher_disagreement_score":0.0048303106,"about_ca_system_score_codex":0.0011124521,"about_ca_system_score_gemma":0.0011314922,"threshold_uncertainty_score":0.0145148635},"labels":[],"label_agreement":null},{"id":"W2168211388","doi":"10.1109/tpwrs.2004.840376","title":"Screening and Mitigation of Exacerbated Market Power Due to Financial Transmission Rights","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Transmission (telecommunications); Position (finance); Transmission network; Power transmission; Market power; Mathematical optimization; Quadratic programming; Quadratic equation; Business; Economics; Computer science; Power (physics); Microeconomics; Finance; Telecommunications; Mathematics","score_opus":0.004312630940553618,"score_gpt":0.1891452348486838,"score_spread":0.1848326039081302,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168211388","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12057678,0.0002341195,0.8722226,0.00029015166,0.000040771458,0.00026934556,0.00008347701,0.00053175807,0.0057509234],"genre_scores_gemma":[0.8585724,0.00009393427,0.13944432,0.000044472617,0.000025414709,0.0001247865,0.00005446265,0.000024187551,0.0016159527],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988356,0.0004906585,0.000049246966,0.00015143608,0.00032940248,0.00014367381],"domain_scores_gemma":[0.9968862,0.0016688635,0.00071776065,0.00025600454,0.00032932975,0.00014185101],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002873296,0.00080464623,0.0013792549,0.0015430048,0.00034632097,0.0013207406,0.0015220403,0.0008030212,0.0029058175],"category_scores_gemma":[0.0070909974,0.00041677352,0.00055638177,0.0008521943,0.0008305732,0.0021922553,0.0010070489,0.000536225,0.00014490866],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038787897,0.00037321736,0.008006233,0.00026124116,0.00014147414,0.0008220388,0.00020924311,0.5850934,0.029974943,0.107106596,0.0014494392,0.2661743],"study_design_scores_gemma":[0.000040251274,0.00026270744,0.001617746,0.000013395158,0.000028337006,0.00015948211,0.0000566622,0.97468376,0.0065773893,0.015700733,0.0008290414,0.000030549625],"about_ca_topic_score_codex":0.0008630522,"about_ca_topic_score_gemma":0.0012095055,"teacher_disagreement_score":0.0029058175,"about_ca_system_score_codex":0.00067679776,"about_ca_system_score_gemma":0.001313406,"threshold_uncertainty_score":0.015195668},"labels":[],"label_agreement":null},{"id":"W2168503562","doi":"10.1109/allerton.2010.5706887","title":"Volatility and efficiency in markets with friction","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Volatility (finance); Market efficiency; Stochastic differential equation; Economics; Differential game; Function (biology); Econometrics; Game theory; Mathematical optimization; Computer science; Mathematical economics; Financial economics; Mathematics; Applied mathematics","score_opus":0.0018080987973579047,"score_gpt":0.16069326342862514,"score_spread":0.15888516463126723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168503562","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38276255,0.001069673,0.59333104,0.0023210878,0.00006593462,0.00009932879,0.00011836604,0.00016470054,0.0200673],"genre_scores_gemma":[0.9910687,0.00025675856,0.0066661495,0.00007277199,0.000035978086,0.000039474427,0.000025306892,0.000026251939,0.0018084614],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997682,0.0010835617,0.00009696699,0.00027160646,0.0004129396,0.00045294798],"domain_scores_gemma":[0.99213904,0.0052838936,0.0012659268,0.0006413392,0.00035788087,0.0003118834],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00414277,0.0007562656,0.0018109616,0.000929176,0.00080910954,0.0036760857,0.001420403,0.0020080407,0.0031653258],"category_scores_gemma":[0.017060775,0.0006071245,0.0010274799,0.0010123675,0.0030873795,0.0060053887,0.0024211786,0.0012367606,0.00034281777],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000118612814,0.00006420516,0.0010584637,0.00006782568,0.000070888505,0.00018349575,0.00012857323,0.32036078,0.0015003112,0.67008203,0.00055476965,0.0058100363],"study_design_scores_gemma":[0.000061939376,0.000063432184,0.00044524195,0.000019095447,0.000019218216,0.00007280044,0.00007070327,0.44606355,0.0004278209,0.5520458,0.0006859426,0.000024453606],"about_ca_topic_score_codex":0.0010411588,"about_ca_topic_score_gemma":0.00051293435,"teacher_disagreement_score":0.00414277,"about_ca_system_score_codex":0.0016475423,"about_ca_system_score_gemma":0.001023526,"threshold_uncertainty_score":0.021909356},"labels":[],"label_agreement":null},{"id":"W2169896638","doi":"10.1109/icsmc.2007.4413842","title":"Pattern search optimization applied to convex and non-convex economic dispatch","year":2007,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Economic dispatch; Mathematical optimization; Heuristic; Regular polygon; Quadratic equation; Computer science; Electric power system; Function (biology); Convex function; Point (geometry); Mathematics; Power (physics)","score_opus":0.0038054446467615543,"score_gpt":0.19592027216216573,"score_spread":0.19211482751540418,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2169896638","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00843679,0.00027504578,0.98756975,0.00014508111,0.00006321325,0.000049728304,0.000026723987,0.00021000346,0.0032236497],"genre_scores_gemma":[0.37822884,0.0005881919,0.6167324,0.00009050166,0.000044066706,0.00030264113,0.00007500733,0.00011059008,0.0038277204],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993635,0.00032710814,0.00003555471,0.000058428257,0.0001871729,0.000028365615],"domain_scores_gemma":[0.9990164,0.0006023035,0.0000868106,0.0001262186,0.0001452421,0.000022949842],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009866458,0.000557859,0.0009038024,0.0004023669,0.00027580242,0.00058751553,0.00053625053,0.00061288546,0.0019203192],"category_scores_gemma":[0.0039628083,0.00043189165,0.00037447189,0.0011146967,0.00052868447,0.00059099734,0.0005981765,0.0007142281,0.0003782524],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055632438,0.000025514171,0.00031400766,0.00010184288,0.000040480754,0.00007226482,0.000027715505,0.8779089,0.0013692172,0.023923349,0.0010593282,0.095101744],"study_design_scores_gemma":[0.0000110088795,0.000018982406,0.00007489201,0.0000036865915,0.0000029465573,0.000017826656,0.0000025553425,0.9922131,0.0005336221,0.006220715,0.0008980543,0.0000025404279],"about_ca_topic_score_codex":0.0027844606,"about_ca_topic_score_gemma":0.0021463507,"teacher_disagreement_score":0.0027844606,"about_ca_system_score_codex":0.00049454806,"about_ca_system_score_gemma":0.00083580194,"threshold_uncertainty_score":0.0064240694},"labels":[],"label_agreement":null},{"id":"W2170036927","doi":"10.1109/tste.2012.2230346","title":"Multiagent Stochastic Simulation of Minute-to-Minute Grid Operations and Control to Integrate Wind Generation Under AC Power Flow Constraints","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Wind power; Grid; Automatic Generation Control; Computer science; Interconnection; Reliability (semiconductor); Power system simulation; Electric power system; Automatic frequency control; Electricity generation; Reliability engineering; Simulation; Computation; Real-time computing; Engineering; Power (physics); Electrical engineering; Telecommunications","score_opus":0.006983961489957405,"score_gpt":0.20225131572324448,"score_spread":0.19526735423328706,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2170036927","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8315727,0.00006899266,0.15975428,0.00022390622,0.00004902204,0.00008084018,0.00045091572,0.00048325057,0.0073159896],"genre_scores_gemma":[0.99495465,0.000016404721,0.0042513786,0.000009407466,0.0000027045303,0.000023298004,0.00007991657,0.000008900059,0.00065332564],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998492,0.000056188812,0.00000755441,0.000021739454,0.000036953934,0.000028348944],"domain_scores_gemma":[0.9992648,0.00042853924,0.000098671524,0.000050909104,0.0001020541,0.000055054217],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004918168,0.0003714359,0.00037011676,0.0002508699,0.00034716656,0.00051772554,0.0005925679,0.00042887067,0.0013249088],"category_scores_gemma":[0.0013187049,0.0002334328,0.0003389502,0.00030217782,0.00039861054,0.00030498873,0.0003011324,0.00058069656,0.00008513475],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009869697,0.0000070674796,0.00036181166,0.0000019842826,0.0000040059113,0.0000081143035,0.0000049934692,0.99878365,0.00011290145,0.00034410888,0.000030869716,0.00033059288],"study_design_scores_gemma":[0.0000020170228,0.0000039736424,0.000110201894,1.957808e-7,7.5004516e-7,7.5574616e-7,0.0000018835357,0.9997539,0.000043444157,0.000054840893,0.000027415334,6.223824e-7],"about_ca_topic_score_codex":0.091831185,"about_ca_topic_score_gemma":0.06571717,"teacher_disagreement_score":0.091831185,"about_ca_system_score_codex":0.0013174383,"about_ca_system_score_gemma":0.0010499641,"threshold_uncertainty_score":0.18259335},"labels":[],"label_agreement":null},{"id":"W2171396468","doi":"","title":"Market Effectiveness Assessment","year":2001,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity market; Market power; Business; Market analysis; Industrial organization; Electricity; Electric power industry; Economics; Marketing; Engineering; Market economy","score_opus":0.004199022243191215,"score_gpt":0.22051969316928455,"score_spread":0.21632067092609333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2171396468","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.042058002,0.0030705607,0.0053671226,0.003735237,0.00043374405,0.0014876638,0.018261898,0.00021520474,0.92537063],"genre_scores_gemma":[0.65938234,0.0054909284,0.009223795,0.001426082,0.00081916363,0.0013448934,0.021667255,0.0001885027,0.30045712],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9928035,0.0008650078,0.00020665096,0.00018410933,0.0054641482,0.00047657423],"domain_scores_gemma":[0.97511035,0.004225041,0.0013300679,0.00064610085,0.018064262,0.00062421156],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008208502,0.00045185428,0.00044397157,0.0054547326,0.00080593076,0.0033179165,0.0010717084,0.0004391322,0.054566514],"category_scores_gemma":[0.020363307,0.0001294153,0.00054587156,0.0038985556,0.00039943864,0.0012853012,0.0005286081,0.00038928253,0.004645412],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004670584,0.0002529086,0.04212909,0.0011257611,0.00016444226,0.00024619547,0.00055536913,0.016038653,0.000912847,0.061829824,0.45297384,0.42330408],"study_design_scores_gemma":[0.00013851658,0.00072810025,0.14079691,0.0007414436,0.00023322183,0.00013125023,0.003437974,0.01801483,0.0027651638,0.014404286,0.81852025,0.00008797465],"about_ca_topic_score_codex":0.097781196,"about_ca_topic_score_gemma":0.14361767,"teacher_disagreement_score":0.097781196,"about_ca_system_score_codex":0.008630785,"about_ca_system_score_gemma":0.0074539976,"threshold_uncertainty_score":0.1944241},"labels":[],"label_agreement":null},{"id":"W2172125678","doi":"10.1109/mper.2001.4311150","title":"Valuation of Dynamic Reactive Power Support Services for Transmission Access","year":2001,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Powertech Labs (Canada)","funders":"","keywords":"Valuation (finance); AC power; Procurement; Risk analysis (engineering); Business; Electricity; Computer science; Environmental economics; Economics; Finance; Engineering; Marketing; Electrical engineering","score_opus":0.013444254591261572,"score_gpt":0.27068763982653704,"score_spread":0.25724338523527546,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2172125678","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30783045,0.00071508565,0.66448706,0.00072226324,0.000069887785,0.00015043278,0.00017780896,0.00007191658,0.025775077],"genre_scores_gemma":[0.98476183,0.0001898127,0.013767392,0.000009599825,0.000025957375,0.000029875559,0.000029217828,0.000011709705,0.0011746467],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99722594,0.0016379436,0.00007244684,0.00014479387,0.0007646888,0.00015412403],"domain_scores_gemma":[0.99411255,0.004062418,0.0004789529,0.00052238314,0.0006399091,0.00018375633],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004376945,0.00072123384,0.0005364477,0.0010638984,0.00031141314,0.0028066959,0.0008890612,0.0007739179,0.002673282],"category_scores_gemma":[0.019376501,0.00025499452,0.0004134605,0.0013175858,0.0010719666,0.0043643066,0.0010853503,0.0008266506,0.00016275239],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005272576,0.00009799304,0.0043025855,0.0001440862,0.00006415665,0.00032129837,0.00018973001,0.5210769,0.006736785,0.3211465,0.00081431965,0.14457837],"study_design_scores_gemma":[0.000022702778,0.00015196747,0.0015684543,0.000043932483,0.000027439753,0.00015451526,0.00016776184,0.90756667,0.0026114346,0.08622574,0.0014323393,0.000027004266],"about_ca_topic_score_codex":0.0006322827,"about_ca_topic_score_gemma":0.0006098432,"teacher_disagreement_score":0.004376945,"about_ca_system_score_codex":0.0020039072,"about_ca_system_score_gemma":0.0007897075,"threshold_uncertainty_score":0.023147762},"labels":[],"label_agreement":null},{"id":"W2172171685","doi":"10.1109/tpwrs.2007.894858","title":"Negotiating Bilateral Contracts in Electricity Markets","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Spot contract; Forward contract; Negotiation; Regret; Spot market; Electricity; Electricity market; Microeconomics; Vendor; Generator (circuit theory); Economics; Forward price; Business; Computer science; Finance; Marketing; Power (physics); Engineering","score_opus":0.0055624995670086955,"score_gpt":0.20109169869598606,"score_spread":0.19552919912897737,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2172171685","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06382747,0.00035553542,0.9152772,0.0008844256,0.000059065143,0.00044983567,0.00007273393,0.00014487538,0.018928807],"genre_scores_gemma":[0.77553517,0.00037952038,0.21550891,0.00016908576,0.00006710512,0.0006161031,0.00009945197,0.00006942509,0.0075552003],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98332375,0.011765672,0.00069603545,0.0010820882,0.002149429,0.0009831036],"domain_scores_gemma":[0.9798306,0.01587685,0.0014997125,0.0012734463,0.0007695308,0.0007499042],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020664899,0.0009974013,0.0016285062,0.00091511843,0.002401884,0.0040324815,0.002400487,0.0040052966,0.008807391],"category_scores_gemma":[0.034532536,0.0010421908,0.0013121507,0.0016220825,0.003361933,0.008448834,0.006369441,0.0030779438,0.00093457196],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038583376,0.00016165059,0.0011299467,0.0001713136,0.000106832194,0.0005964102,0.0014203083,0.269011,0.0018234057,0.6803023,0.0016420195,0.043249022],"study_design_scores_gemma":[0.00013321481,0.00010782211,0.00016059412,0.00004048283,0.00002327351,0.00012601138,0.00029456508,0.5449609,0.00073991675,0.44825804,0.005117883,0.00003730677],"about_ca_topic_score_codex":0.0017222688,"about_ca_topic_score_gemma":0.0016743778,"teacher_disagreement_score":0.020664899,"about_ca_system_score_codex":0.002039438,"about_ca_system_score_gemma":0.0033292992,"threshold_uncertainty_score":0.10928774},"labels":[],"label_agreement":null},{"id":"W2178564072","doi":"10.1109/tpwrs.2012.2187345","title":"A Practical Real-Time OPF Method Using New Triangular Approximate Model of Wind Electric Generators","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Monte Carlo method; Probabilistic logic; Electric power system; Wind power; Wind speed; Economic dispatch; Transmission (telecommunications); Engineering; Computer science; Mathematical optimization; Simulation; Power (physics); Control theory (sociology); Real-time computing; Statistics; Electrical engineering; Mathematics; Control (management)","score_opus":0.03125046962274885,"score_gpt":0.2789079514905259,"score_spread":0.24765748186777703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2178564072","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031468768,0.000041305622,0.99524504,0.000048388945,0.00001291366,0.00001584126,0.000024979669,0.000072540584,0.0013920211],"genre_scores_gemma":[0.5983442,0.0003356651,0.3950672,0.00011636741,0.000056394307,0.00026356356,0.00023675984,0.00015499513,0.0054248897],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997794,0.000070552596,0.000009272077,0.000034924604,0.0000841055,0.000021725711],"domain_scores_gemma":[0.9995944,0.00022544622,0.000037945814,0.000030411938,0.00009517323,0.000016685295],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049399096,0.0005783326,0.00063561543,0.0003063269,0.00035362414,0.0005987949,0.00082667737,0.0007352077,0.0032924348],"category_scores_gemma":[0.001464923,0.00031247546,0.0005775983,0.0005856158,0.00033127138,0.00087167585,0.0003568432,0.0008208902,0.00045794717],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012623662,0.000008612135,0.00013387554,0.000020753081,0.0000057551674,0.000026911503,0.00001751933,0.9769563,0.0006710175,0.004853414,0.00035235097,0.016940782],"study_design_scores_gemma":[9.758885e-7,0.000002538486,0.000010307777,7.8604273e-7,6.0365267e-7,0.0000041605426,0.0000015139325,0.9993468,0.000048222166,0.00043249122,0.00015051985,0.0000010065431],"about_ca_topic_score_codex":0.011289469,"about_ca_topic_score_gemma":0.007872628,"teacher_disagreement_score":0.011289469,"about_ca_system_score_codex":0.000654915,"about_ca_system_score_gemma":0.0010056711,"threshold_uncertainty_score":0.022447526},"labels":[],"label_agreement":null},{"id":"W2180269203","doi":"10.1109/tpwrs.2013.2271980","title":"Identification of Umbrella Constraints in DC-Based Security-Constrained Optimal Power Flow","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":148,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Mathematical optimization; Power flow; Constraint (computer-aided design); Set (abstract data type); Optimization problem; Computer science; Power (physics); Mathematics; Electric power system","score_opus":0.005698909431682394,"score_gpt":0.20064812216742858,"score_spread":0.1949492127357462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2180269203","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017108172,0.00039449395,0.97681195,0.0002644522,0.00005188837,0.00009690724,0.00021749074,0.000099507124,0.0049551013],"genre_scores_gemma":[0.5425634,0.0012467155,0.44912162,0.00032698637,0.00015901536,0.00062749867,0.00076147565,0.00022655386,0.004966745],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877733,0.0005529589,0.000059827864,0.00020242036,0.0002606031,0.00014690275],"domain_scores_gemma":[0.9976184,0.0015677093,0.0003271563,0.00013716792,0.0002284346,0.00012113226],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023230675,0.0018667671,0.0018466349,0.0010667539,0.0007528163,0.002304429,0.0011876101,0.0016722971,0.0027054932],"category_scores_gemma":[0.0062743574,0.0010588135,0.0011450775,0.0014781506,0.0014259259,0.0020473914,0.00174774,0.0024245877,0.0004992352],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048857182,0.000024798297,0.00022857783,0.000055372104,0.00001562679,0.00010457115,0.000029911202,0.962789,0.0006418442,0.026555922,0.00088552455,0.008620011],"study_design_scores_gemma":[0.0000039062884,0.00001037571,0.000057240995,0.000014071819,0.000002651946,0.000011130133,0.000008183102,0.9906001,0.00022646185,0.008567084,0.00049191696,0.0000068261493],"about_ca_topic_score_codex":0.008086666,"about_ca_topic_score_gemma":0.0052938336,"teacher_disagreement_score":0.008086666,"about_ca_system_score_codex":0.0014836497,"about_ca_system_score_gemma":0.0016240204,"threshold_uncertainty_score":0.016079247},"labels":[],"label_agreement":null},{"id":"W21808505","doi":"10.1007/0-306-47663-0_15","title":"Decentralized Nodal-Price Self-Dispatch and Unit Commitment","year":2005,"lang":"en","type":"book-chapter","venue":"Kluwer Academic Publishers eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; McGill University","funders":"","keywords":"Computer science; Common value auction; Mathematical optimization; Exploit; Scheduling (production processes); Profit (economics); Power system simulation; Operations research; Microeconomics; Economics; Electric power system; Power (physics); Mathematics; Computer security","score_opus":0.01186199189299367,"score_gpt":0.2097926629806227,"score_spread":0.19793067108762905,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W21808505","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015328407,0.00071344955,0.9123516,0.00041229813,0.000170517,0.00009751625,0.00007236771,0.00035026044,0.07050351],"genre_scores_gemma":[0.632633,0.0016558763,0.26271108,0.00017045237,0.00017723399,0.00027220658,0.00018427326,0.00028063502,0.10191532],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996024,0.00011726837,0.000014879312,0.000059673945,0.000173203,0.00003256167],"domain_scores_gemma":[0.99980694,0.000068707785,0.000016080512,0.00006516759,0.00003068459,0.000012456609],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055029494,0.00034719633,0.0004697978,0.00017813996,0.00038658766,0.0008942066,0.0012587449,0.00041432958,0.006066383],"category_scores_gemma":[0.00073869067,0.00028347687,0.00039231582,0.00049754017,0.00060844404,0.0013024823,0.0008545174,0.00093588815,0.001141881],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005843789,0.00004871771,0.00013063072,0.00008985546,0.00001549026,0.000061552535,0.00010236129,0.23435605,0.0031475162,0.6525682,0.005358236,0.104062974],"study_design_scores_gemma":[0.00003302147,0.000059959013,0.00014700813,0.00002461943,0.0000081665385,0.00010506179,0.000031557483,0.7384813,0.002710998,0.21249574,0.04588675,0.000015843194],"about_ca_topic_score_codex":0.0007522986,"about_ca_topic_score_gemma":0.00088839175,"teacher_disagreement_score":0.006066383,"about_ca_system_score_codex":0.00094010145,"about_ca_system_score_gemma":0.00076717575,"threshold_uncertainty_score":0.02029407},"labels":[],"label_agreement":null},{"id":"W2181044291","doi":"","title":"Wind farms as reactive power ancillary service providers - technical and economic issues","year":2008,"lang":"en","type":"article","venue":"Chalmers Publication Library (Chalmers University of Technology)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Payment; Grid; Turbine; Reliability engineering; Service (business); AC power; Term (time); Wind speed; Electric power system; Electricity; Component (thermodynamics); Operations research; Environmental science; Power (physics); Environmental economics; Meteorology; Engineering; Business; Electrical engineering; Economics; Mathematics; Finance; Geography","score_opus":0.005252733575385164,"score_gpt":0.16721054456767626,"score_spread":0.1619578109922911,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2181044291","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3998005,0.015199821,0.29044855,0.033305794,0.00073429296,0.00022584677,0.0004606518,0.0002969702,0.25952756],"genre_scores_gemma":[0.9703525,0.0032109302,0.014033757,0.00022743348,0.00014866344,0.000053839918,0.0000444069,0.000026188907,0.011902431],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99903846,0.0005664857,0.00001875151,0.00006799568,0.00021513266,0.00009333727],"domain_scores_gemma":[0.99844766,0.0010379122,0.00014064115,0.000090181056,0.00021161718,0.000071934475],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016791287,0.0005081759,0.00039620942,0.0003807968,0.0006710747,0.0032714738,0.0010799515,0.0018625932,0.006354324],"category_scores_gemma":[0.0032998212,0.0004481178,0.0003228656,0.0008293343,0.00089084747,0.0046866313,0.0006593161,0.000805629,0.00056606205],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001992798,0.00018638287,0.0063789827,0.00020113586,0.00005195942,0.0010497354,0.00009180856,0.42867124,0.003007389,0.4569871,0.006042688,0.09713231],"study_design_scores_gemma":[0.000101140584,0.0002666254,0.004011058,0.00026221265,0.00006413613,0.0008817303,0.000965469,0.77351457,0.0025075148,0.1726128,0.04474384,0.00006895123],"about_ca_topic_score_codex":0.0023134768,"about_ca_topic_score_gemma":0.0050126407,"teacher_disagreement_score":0.006354324,"about_ca_system_score_codex":0.0010453928,"about_ca_system_score_gemma":0.00088188093,"threshold_uncertainty_score":0.02125734},"labels":[],"label_agreement":null},{"id":"W2184804762","doi":"10.24200/tjer.vol7iss2pp24-31","title":"Impacts of Wind Power Variability on Generation Costs - An Overview","year":2010,"lang":"en","type":"article","venue":"The Journal of Engineering Research [TJER]","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"University of Waterloo; Sultan Qaboos University","keywords":"Wind power; Electricity; Electricity generation; Globe; Environmental science; Environmental economics; Power (physics); Meteorology; Engineering; Electrical engineering; Economics; Geography; Medicine","score_opus":0.042556587748235425,"score_gpt":0.3289526866390106,"score_spread":0.2863960988907752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2184804762","genre_codex":"empirical","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45762074,0.36443186,0.049198836,0.0023543783,0.0003465635,0.00015157761,0.0027478405,0.0002662417,0.12288202],"genre_scores_gemma":[0.7716962,0.21462253,0.006913594,0.00021107835,0.00053983304,0.000041652318,0.0008118137,0.000056686167,0.0051065814],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99967813,0.000057912013,0.000025234003,0.000035838082,0.0001565258,0.000046391637],"domain_scores_gemma":[0.9990984,0.00058737537,0.00009311802,0.00001679421,0.00018340145,0.000020842275],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031728065,0.00053845986,0.0005987073,0.0018563317,0.00017309876,0.001603421,0.00028086308,0.00052728615,0.0015564678],"category_scores_gemma":[0.00069987454,0.00027835692,0.00066256704,0.0021971024,0.00013199313,0.0010885389,0.00028713373,0.00044311793,0.00029895178],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005668183,0.0002718141,0.04877648,0.003647788,0.0010325211,0.00208409,0.00016335954,0.3159624,0.007479534,0.012320522,0.0077155577,0.59997904],"study_design_scores_gemma":[0.00007554897,0.0024947608,0.47213948,0.0033407183,0.0027398332,0.0058970395,0.001216156,0.223492,0.019194799,0.039709292,0.22935124,0.00034903584],"about_ca_topic_score_codex":0.0029409553,"about_ca_topic_score_gemma":0.00331049,"teacher_disagreement_score":0.0029409553,"about_ca_system_score_codex":0.0005085391,"about_ca_system_score_gemma":0.00028404445,"threshold_uncertainty_score":0.0058476925},"labels":[],"label_agreement":null},{"id":"W2198099674","doi":"","title":"Market Power Indices and Wholesale Price Elasticity of Electricity Demand","year":2014,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Guelph","funders":"","keywords":"Price elasticity of demand; Lerner index; Economics; Market power; Electricity market; Wholesale market; Electricity; Elasticity (physics); Econometrics; Index (typography); Agricultural economics; Microeconomics","score_opus":0.008429493135086676,"score_gpt":0.24201221818581162,"score_spread":0.23358272505072494,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2198099674","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98845273,0.000040121937,0.0035582087,0.00011320674,0.000002015868,0.000010529366,0.0008973741,0.0000246899,0.006901057],"genre_scores_gemma":[0.998818,0.000018009514,0.0001976624,0.000004140158,0.0000017837855,0.000003737009,0.00044111052,0.0000052781447,0.00051025936],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997634,0.000041475465,0.000009853428,0.000038698854,0.00010504412,0.000041543874],"domain_scores_gemma":[0.9980835,0.0010050478,0.00045050186,0.00015553641,0.00023589026,0.00006952119],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039233544,0.00015778237,0.0001904945,0.00061299937,0.0001279673,0.00054670544,0.00028515665,0.00020676859,0.0033551047],"category_scores_gemma":[0.004923786,0.00015284074,0.00022614718,0.001332265,0.00037974044,0.00051992794,0.00020623498,0.00027552305,0.0002530852],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028414075,0.00009338504,0.63544756,0.00007985581,0.00021001096,0.00046290288,0.00073051197,0.3015994,0.0131842615,0.024151312,0.0028899584,0.020866655],"study_design_scores_gemma":[0.000012557385,0.000032811127,0.8198995,0.000004685448,0.00001277766,0.00008256524,0.00027042325,0.169787,0.0014118097,0.0067122895,0.0017480488,0.000025502159],"about_ca_topic_score_codex":0.074683025,"about_ca_topic_score_gemma":0.08573049,"teacher_disagreement_score":0.074683025,"about_ca_system_score_codex":0.0016070626,"about_ca_system_score_gemma":0.0003596444,"threshold_uncertainty_score":0.14849663},"labels":[],"label_agreement":null},{"id":"W2205798303","doi":"","title":"Genetic Algorithms: An Overview and Application to Power System Optimization","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Mathematical optimization; Electric power system; Computer science; Robustness (evolution); Genetic algorithm; Optimization problem; Nonlinear programming; Set (abstract data type); Power (physics); Nonlinear system; Algorithm; Mathematics","score_opus":0.005278324383300367,"score_gpt":0.20535963753719214,"score_spread":0.20008131315389177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2205798303","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030102336,0.06054184,0.91693467,0.0015676132,0.0002981557,0.00009760475,0.00011202891,0.0005508432,0.016886964],"genre_scores_gemma":[0.11401825,0.16393265,0.70976603,0.0007214682,0.0011842763,0.00039621838,0.0004310796,0.00039444902,0.009155569],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99942327,0.00019693784,0.00003798276,0.00006837295,0.00024578057,0.0000277012],"domain_scores_gemma":[0.9993167,0.00047944323,0.000029073559,0.000033397275,0.0001195788,0.000021765582],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009254105,0.0013655196,0.0014411398,0.0017432135,0.00040593292,0.0014435903,0.00090699684,0.0018474136,0.002103386],"category_scores_gemma":[0.002307539,0.0005513295,0.0008902488,0.004986335,0.001104415,0.0011161917,0.0007665791,0.0019905895,0.0010257028],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003504403,0.00007145554,0.0008178745,0.0007347689,0.000183698,0.0001898313,0.00013400022,0.54654115,0.0011754817,0.063003875,0.011509125,0.37560374],"study_design_scores_gemma":[0.00006802981,0.00010490271,0.0010532102,0.0004812018,0.000077934994,0.00039357334,0.000085301726,0.6802606,0.0010383422,0.20013632,0.11623847,0.00006216341],"about_ca_topic_score_codex":0.005063303,"about_ca_topic_score_gemma":0.00328805,"teacher_disagreement_score":0.005063303,"about_ca_system_score_codex":0.0007312532,"about_ca_system_score_gemma":0.00092361704,"threshold_uncertainty_score":0.010067642},"labels":[],"label_agreement":null},{"id":"W2224802780","doi":"10.47749/t/unicamp.2000.199313","title":"Fluxo de potencia otimo parametrico","year":2000,"lang":"es","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Physics; Art","score_opus":0.003236181899050255,"score_gpt":0.19183063296362457,"score_spread":0.18859445106457431,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2224802780","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033125054,0.00089703215,0.94876736,0.00050883077,0.000109582375,0.000065104105,0.00011247114,0.000217303,0.016197374],"genre_scores_gemma":[0.7895819,0.0020399073,0.19081226,0.0002904569,0.00015399342,0.00024658046,0.0002457862,0.00034454212,0.016284617],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99845314,0.0003425219,0.00008000043,0.00035519426,0.0005941394,0.00017501182],"domain_scores_gemma":[0.99737394,0.0016189506,0.00022476377,0.00030535736,0.00041724028,0.000059872193],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002064743,0.0014033668,0.0013920274,0.00097619125,0.0009158319,0.003739461,0.0016153014,0.0017839039,0.0067678182],"category_scores_gemma":[0.007896496,0.0006794597,0.0012250942,0.0009780858,0.0018691834,0.0029655204,0.0026156674,0.002002321,0.00060420757],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026579015,0.00007184226,0.0029300645,0.0007762525,0.000092678056,0.00038552744,0.0005201619,0.66677666,0.028152471,0.17990413,0.0016391841,0.11848519],"study_design_scores_gemma":[0.000027501614,0.00019619882,0.0015477452,0.00013871999,0.000059877842,0.0005729804,0.00030425462,0.88320225,0.013275294,0.08263833,0.017972123,0.00006476747],"about_ca_topic_score_codex":0.0038201134,"about_ca_topic_score_gemma":0.002457473,"teacher_disagreement_score":0.0067678182,"about_ca_system_score_codex":0.0016247234,"about_ca_system_score_gemma":0.0016517217,"threshold_uncertainty_score":0.022640586},"labels":[],"label_agreement":null},{"id":"W2236616832","doi":"10.6000/1929-6002.2015.04.04.3","title":"Regional Electric-Power Systems Planning and Carbon Dioxide Emissions Management under Uncertainty","year":2015,"lang":"en","type":"article","venue":"Journal of Technology Innovations in Renewable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Fundamental Research Funds for the Central Universities; National Key Research and Development Program of China","keywords":"Renewable energy; Time horizon; Environmental economics; Electricity; Electricity generation; Energy planning; Electric power system; Fossil fuel; Electric power; Energy supply; Environmental science; Power (physics); Engineering; Business; Energy (signal processing); Economics; Waste management; Electrical engineering","score_opus":0.01431194286651096,"score_gpt":0.2323775069485291,"score_spread":0.21806556408201813,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2236616832","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08618759,0.0009599079,0.88053066,0.0007318316,0.00005238608,0.000089593086,0.00074457977,0.00023693925,0.030466516],"genre_scores_gemma":[0.959981,0.00063536933,0.033373702,0.000049400125,0.000018370649,0.000101956764,0.00030422647,0.000050587725,0.005485282],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993625,0.00030802467,0.000016885515,0.00012860306,0.00008438974,0.000099600366],"domain_scores_gemma":[0.99962986,0.00020381069,0.00006172788,0.000016188364,0.000056876735,0.000031608164],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007544348,0.0008260364,0.0007936837,0.0004578771,0.00033410717,0.0014183823,0.0010177274,0.0009522748,0.0027092511],"category_scores_gemma":[0.0014993765,0.00047415457,0.00082874065,0.0010665968,0.0005210683,0.001218575,0.0007009712,0.0007547278,0.00021947533],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010638655,0.0000046950536,0.00013895133,0.000014177158,0.000010068462,0.00003408762,0.000009461412,0.9920562,0.00010585609,0.00625284,0.000109090775,0.0012537792],"study_design_scores_gemma":[0.0000050320637,0.000016639697,0.00014550438,0.00000594922,0.000012638403,0.00001285154,0.00002714565,0.9934034,0.00019388016,0.0055326982,0.0006380108,0.000006204165],"about_ca_topic_score_codex":0.013998663,"about_ca_topic_score_gemma":0.012081687,"teacher_disagreement_score":0.013998663,"about_ca_system_score_codex":0.0016492263,"about_ca_system_score_gemma":0.0016171341,"threshold_uncertainty_score":0.027834356},"labels":[],"label_agreement":null},{"id":"W2243807080","doi":"","title":"Wind and solar curtailment","year":2013,"lang":"en","type":"article","venue":"Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Wind power; Meteorology; Environmental science; Electric power system; Solar power; Photovoltaic system; Engineering; Power (physics); Electrical engineering; Geography; Physics","score_opus":0.03433597912488528,"score_gpt":0.3231545892502786,"score_spread":0.28881861012539334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2243807080","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46656728,0.014295608,0.06617917,0.0038279947,0.00069083733,0.00019155056,0.00063468504,0.0005852014,0.44702756],"genre_scores_gemma":[0.95909154,0.0026236332,0.0034273106,0.00023643997,0.000112458765,0.000017805087,0.00016398053,0.00008164807,0.03424519],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994849,0.000120752455,0.000024293015,0.00009000446,0.00020720769,0.00007284982],"domain_scores_gemma":[0.9995925,0.00011248583,0.00007567413,0.00004809663,0.0001259677,0.00004527469],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038416882,0.0003625054,0.00041189895,0.00034648244,0.0003969782,0.0010389943,0.00030378703,0.0005145138,0.0083827125],"category_scores_gemma":[0.0011358428,0.00012904686,0.00033845712,0.0006697273,0.00025514187,0.0008190949,0.0004892472,0.00043859275,0.000795689],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008743343,0.0002858027,0.027502483,0.0011792133,0.00023006168,0.0014002636,0.00084974687,0.17951319,0.038122047,0.056071583,0.015567145,0.67840415],"study_design_scores_gemma":[0.00027648604,0.0018084719,0.20198703,0.0006540628,0.00022919795,0.0019471443,0.002324764,0.16043666,0.03362524,0.08776119,0.50875723,0.00019252881],"about_ca_topic_score_codex":0.0035667112,"about_ca_topic_score_gemma":0.0067437342,"teacher_disagreement_score":0.0083827125,"about_ca_system_score_codex":0.0005284711,"about_ca_system_score_gemma":0.00037633264,"threshold_uncertainty_score":0.028042972},"labels":[],"label_agreement":null},{"id":"W2244981840","doi":"10.1109/epec.2015.7379933","title":"A proof-of-concept approach to Unit Commitment using the theory of complementarity","year":2015,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Power system simulation; Mathematical optimization; Solver; Complementarity (molecular biology); Computer science; Grid; Integer programming; Complementarity theory; Proof of concept; Power (physics); Electric power system; Mathematics; Nonlinear system","score_opus":0.08519581602566759,"score_gpt":0.27083478478361017,"score_spread":0.18563896875794259,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2244981840","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00031702188,0.00037004086,0.9827806,0.0006212305,0.00023334945,0.00016111533,0.00006673229,0.00022292175,0.01522701],"genre_scores_gemma":[0.05899499,0.0020313074,0.9236013,0.0010611902,0.00053949706,0.0011209706,0.0002139126,0.00036812984,0.012068694],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99696845,0.0010177633,0.000109743516,0.00036187842,0.0013725405,0.00016968514],"domain_scores_gemma":[0.99537694,0.0028262625,0.00024974465,0.00059391186,0.00084071583,0.00011237427],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005159738,0.002169448,0.0012369568,0.0013820279,0.0011363345,0.0035019438,0.0035216194,0.0020228983,0.034120385],"category_scores_gemma":[0.013715887,0.0011898889,0.0025800108,0.0018503378,0.0034853597,0.003793241,0.003533562,0.00627195,0.007912553],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027404003,0.00009275377,0.00006257609,0.00050664763,0.000047263748,0.00017083588,0.00008604368,0.029184226,0.0021664298,0.91409093,0.010537543,0.043027405],"study_design_scores_gemma":[0.000102166596,0.0002632451,0.00008359488,0.00061413157,0.000035817568,0.00056283775,0.000080971644,0.20252626,0.0044668033,0.70372415,0.08746932,0.000070724884],"about_ca_topic_score_codex":0.0010015406,"about_ca_topic_score_gemma":0.00087678287,"teacher_disagreement_score":0.034120385,"about_ca_system_score_codex":0.001578994,"about_ca_system_score_gemma":0.0028597564,"threshold_uncertainty_score":0.11414403},"labels":[],"label_agreement":null},{"id":"W2246686487","doi":"10.2139/ssrn.604082","title":"Supply Function Equilibria with Pivotal Electricity Suppliers","year":2004,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Electricity; Function (biology); Industrial organization; Business; Mains electricity; Commerce; Microeconomics; Economics; Engineering; Electrical engineering; Voltage","score_opus":0.0022595791168781043,"score_gpt":0.1637087969459828,"score_spread":0.1614492178291047,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2246686487","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27726597,0.0013470175,0.37234336,0.015212138,0.00036245392,0.00041760266,0.001419256,0.00094543875,0.33068675],"genre_scores_gemma":[0.9418037,0.0007815737,0.013347854,0.00059221,0.00019459872,0.00024391744,0.00014481458,0.00008559098,0.04280575],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99883777,0.00059853203,0.00004440188,0.00014622253,0.00012642551,0.0002466443],"domain_scores_gemma":[0.9937807,0.0041956813,0.0007681791,0.00035412193,0.00041278772,0.000488633],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003026668,0.0013609208,0.0030690096,0.0013579859,0.0016761882,0.0052356073,0.0017399159,0.0054253996,0.029342879],"category_scores_gemma":[0.014188778,0.0012649574,0.0014923492,0.0015987623,0.002520797,0.0061367513,0.003085148,0.0031216536,0.003171053],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036050245,0.00009884826,0.00040942716,0.00022574862,0.00006681783,0.0008208285,0.00020369866,0.038260177,0.0009599153,0.9429425,0.008884757,0.0067668483],"study_design_scores_gemma":[0.0004913123,0.00009154387,0.00023535616,0.000069670874,0.00004404336,0.00037224108,0.00029263017,0.07780462,0.00041290655,0.9159664,0.0041823243,0.00003702017],"about_ca_topic_score_codex":0.0012554241,"about_ca_topic_score_gemma":0.0013589263,"teacher_disagreement_score":0.029342879,"about_ca_system_score_codex":0.0018220865,"about_ca_system_score_gemma":0.0014463692,"threshold_uncertainty_score":0.09816176},"labels":[],"label_agreement":null},{"id":"W2248480965","doi":"10.2139/ssrn.2612234","title":"Inverse Optimization for the Recovery of Market Structure from Market Outcomes: An Application to the MISO Electricity Market","year":2014,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Wilfrid Laurier University","funders":"","keywords":"Electricity market; Electricity; Business; Microeconomics; Economics; Engineering; Electrical engineering","score_opus":0.003357652170966917,"score_gpt":0.19666309418385816,"score_spread":0.19330544201289124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2248480965","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06354249,0.00077323243,0.92085975,0.0020593964,0.00013136546,0.00015126477,0.0002178144,0.00040759039,0.011857101],"genre_scores_gemma":[0.8753693,0.0013590676,0.1000561,0.00045279515,0.00024393525,0.00038655818,0.00042401542,0.00046945686,0.021238767],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989802,0.00054220005,0.00003851624,0.00013854657,0.00017876945,0.00012183544],"domain_scores_gemma":[0.9923212,0.0063487287,0.000445579,0.00030027033,0.0003597662,0.00022450741],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005674534,0.0017885017,0.0032229421,0.0011702853,0.0007815519,0.002309027,0.0017739631,0.0029262211,0.00627903],"category_scores_gemma":[0.025208047,0.0013212564,0.0015749563,0.001337994,0.0039053906,0.004249233,0.0028491754,0.004611008,0.00041621033],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011114024,0.00008091718,0.00042011784,0.000102962746,0.000068184214,0.0001296357,0.000092551614,0.8938082,0.00039601544,0.09271444,0.0015460646,0.010529775],"study_design_scores_gemma":[0.000016128055,0.000013918071,0.00008608814,0.000005550124,0.0000051312536,0.000007984599,0.000010996197,0.9688969,0.00006822705,0.03070437,0.00017271035,0.000011904314],"about_ca_topic_score_codex":0.013248805,"about_ca_topic_score_gemma":0.008733962,"teacher_disagreement_score":0.013248805,"about_ca_system_score_codex":0.0016203346,"about_ca_system_score_gemma":0.004126568,"threshold_uncertainty_score":0.030010223},"labels":[],"label_agreement":null},{"id":"W2259533060","doi":"10.17863/cam.5224","title":"A cross country analysis of electricity market reforms","year":2012,"lang":"en","type":"article","venue":"Apollo (University of Cambridge)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity market; Electricity; Economics; Business; Natural resource economics; Engineering","score_opus":0.00412463992307961,"score_gpt":0.18300225966973957,"score_spread":0.17887761974665997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2259533060","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99434906,0.0003769894,0.001095183,0.00018102817,0.000017132546,0.000012656154,0.00077255775,0.000014953267,0.0031803509],"genre_scores_gemma":[0.99733514,0.00018180972,0.0002512772,0.00003856692,0.000009901602,0.00000863564,0.001115866,0.000005096461,0.0010536789],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991301,0.0004236592,0.000035764915,0.00012776701,0.00007691751,0.00020581445],"domain_scores_gemma":[0.994541,0.0027033791,0.0015298538,0.00038174598,0.0005184338,0.00032555606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012286747,0.00015259611,0.00036792297,0.0011281015,0.00029785905,0.0010355316,0.0001880949,0.0003805997,0.0042528883],"category_scores_gemma":[0.004611419,0.00019718052,0.00078908436,0.0021862772,0.00032204142,0.00059868075,0.0007900598,0.0008042989,0.000371988],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004333401,0.00027800468,0.93918324,0.00007057331,0.0013421479,0.00061444903,0.0003492568,0.032658406,0.00076103327,0.007024443,0.0025831268,0.0147020435],"study_design_scores_gemma":[0.000029608404,0.00022606803,0.9717728,0.000025572575,0.00039992394,0.00021663717,0.0013132975,0.019541197,0.00075751514,0.00072079053,0.0049619307,0.000034608933],"about_ca_topic_score_codex":0.02654189,"about_ca_topic_score_gemma":0.020224277,"teacher_disagreement_score":0.02654189,"about_ca_system_score_codex":0.00065424317,"about_ca_system_score_gemma":0.0003874043,"threshold_uncertainty_score":0.052774787},"labels":[],"label_agreement":null},{"id":"W2264656926","doi":"10.2172/814128","title":"Review of the Structure of Bulk Power Markets Grid of the Future White Paper","year":2000,"lang":"en","type":"report","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Restructuring; Competition (biology); Transmission (telecommunications); Industrial organization; Business; Incentive; Electricity market; White paper; Rulemaking; Power transmission; Commission; Telecommunications; Electricity; Computer science; Economics; Finance; Power (physics); Engineering; Microeconomics","score_opus":0.003422760150039919,"score_gpt":0.19700190681917282,"score_spread":0.1935791466691329,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2264656926","genre_codex":"review","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018642403,0.6818234,0.008675328,0.026099263,0.0052300193,0.00007006185,0.00035032464,0.00011220244,0.2757752],"genre_scores_gemma":[0.033508822,0.85841864,0.0049682376,0.0081841685,0.0067036673,0.00010096802,0.0006664761,0.00014653722,0.0873024],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99943,0.00012702067,0.00003901927,0.000075353186,0.00027979893,0.000048818903],"domain_scores_gemma":[0.9991221,0.0003216141,0.00007520092,0.00005605838,0.0003772157,0.00004783527],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011268159,0.0005100306,0.00047799648,0.001934949,0.00070596446,0.0034922445,0.001006378,0.0013903003,0.01402692],"category_scores_gemma":[0.002435867,0.0004066518,0.00031152868,0.0042109205,0.0012967162,0.005454373,0.0008764618,0.0019462206,0.0031679466],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028924835,0.000042359192,0.00020250285,0.0014525081,0.000015128198,0.00016414296,0.00019214851,0.0021986729,0.00021469552,0.45254755,0.2313821,0.31155926],"study_design_scores_gemma":[0.000002716062,0.000013168953,0.00032764088,0.00082016014,0.000003138655,0.000090401714,0.00006194032,0.00030441003,0.000057847108,0.029033756,0.96927816,0.000006621886],"about_ca_topic_score_codex":0.007584717,"about_ca_topic_score_gemma":0.008605596,"teacher_disagreement_score":0.01402692,"about_ca_system_score_codex":0.0030942115,"about_ca_system_score_gemma":0.0036488632,"threshold_uncertainty_score":0.04692471},"labels":[],"label_agreement":null},{"id":"W2264863617","doi":"10.1109/tsg.2015.2445794","title":"Distributed Real-Time Power Balancing in Renewable-Integrated Power Grids With Storage and Flexible Loads","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Electric Power System Optimization","field":"Engineering","cited_by":104,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University; University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"News aggregator; Renewable energy; Grid; Distributed generation; Energy storage; Distributed power; Power (physics); Power Balance; Reliability (semiconductor); Load balancing (electrical power)","score_opus":0.006950663272304577,"score_gpt":0.19564136829368786,"score_spread":0.1886907050213833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2264863617","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.074040994,0.00036370364,0.92121,0.00023320335,0.000051821116,0.000052513635,0.000034369987,0.00040049123,0.0036128566],"genre_scores_gemma":[0.96117073,0.000081405924,0.037424415,0.000033791588,0.000018825347,0.000036152684,0.000028196957,0.000023212506,0.0011833677],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973756,0.00009349224,0.0000118764265,0.000058506732,0.00006130716,0.000037215967],"domain_scores_gemma":[0.99955076,0.00023212249,0.00008143953,0.000046162735,0.000060516457,0.00002896567],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006864144,0.0005548259,0.0007748566,0.0002012738,0.0003677692,0.00069075474,0.0007924009,0.0004941426,0.0013021356],"category_scores_gemma":[0.0012005343,0.00029872957,0.00025531562,0.0005643818,0.0005167321,0.00078071223,0.00064762286,0.0005239592,0.0002165294],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008514604,0.000025456,0.0001819058,0.000021515525,0.000010672249,0.000052467713,0.000017567898,0.9793936,0.0011587241,0.0026084215,0.00027930003,0.016165202],"study_design_scores_gemma":[0.000017025166,0.000013190727,0.00003424163,0.0000012598816,0.0000022002416,0.0000081707585,0.0000038901644,0.9980763,0.0002516525,0.0014944467,0.00009587279,0.0000017685356],"about_ca_topic_score_codex":0.003148533,"about_ca_topic_score_gemma":0.0037475205,"teacher_disagreement_score":0.003148533,"about_ca_system_score_codex":0.000560391,"about_ca_system_score_gemma":0.00056033704,"threshold_uncertainty_score":0.006260395},"labels":[],"label_agreement":null},{"id":"W2266398410","doi":"10.1111/caje.12280","title":"Measuring market power and the efficiency of Alberta's restructured electricity market: An energy‐only market design","year":2017,"lang":"en","type":"article","venue":"Canadian Journal of Economics/Revue canadienne d économique","topic":"Electric Power System Optimization","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Carleton University; University of Alberta","funders":"","keywords":"Market power; Factor market; Electricity market; Economics; Investment (military); Production (economics); Electricity; Market price; Earnings; Industrial organization; Business; Microeconomics; Finance","score_opus":0.041071784659859945,"score_gpt":0.15597164548175751,"score_spread":0.11489986082189757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2266398410","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99060225,0.00007652166,0.002571218,0.00007897459,0.0000032117641,0.000050608996,0.0006358833,0.000026232778,0.005955219],"genre_scores_gemma":[0.99787045,0.000023001257,0.0009191475,0.000010945072,0.0000032927662,0.000014650959,0.00037981806,0.0000037345606,0.00077490596],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999062,0.00021200423,0.00005050229,0.00011376049,0.0004224583,0.0001393598],"domain_scores_gemma":[0.99595356,0.0017032872,0.0011943231,0.00024675412,0.0006336261,0.00026852504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015938681,0.00028984042,0.00033991938,0.0017752319,0.0004079566,0.0020545695,0.00089790986,0.00041871265,0.0025804648],"category_scores_gemma":[0.0049643125,0.00019648328,0.00042365023,0.002261142,0.0011724052,0.00092761824,0.0005585747,0.0004598546,0.0001294953],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007563639,0.0005630675,0.64068884,0.00012827157,0.0005102555,0.00046044143,0.00047287103,0.29464537,0.0060241027,0.02042535,0.0015910215,0.03373407],"study_design_scores_gemma":[0.00007043911,0.00041130153,0.7523534,0.000019926632,0.0001118628,0.000065380045,0.0008745314,0.23478468,0.0020531311,0.006094643,0.0030876547,0.00007298027],"about_ca_topic_score_codex":0.33740565,"about_ca_topic_score_gemma":0.4280631,"teacher_disagreement_score":0.6625943,"about_ca_system_score_codex":0.00743884,"about_ca_system_score_gemma":0.0027788219,"threshold_uncertainty_score":0.6708835},"labels":[],"label_agreement":null},{"id":"W2271923957","doi":"","title":"Optimization models and techniques for implementation and pricing of electricity markets","year":2001,"lang":"en","type":"dissertation","venue":"Library and Archives Canada (Government of Canada)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity market; Electricity pricing; Economics; Environmental economics; Computer science; Industrial organization; Business; Engineering; Electrical engineering","score_opus":0.0025467093073053295,"score_gpt":0.16094549506387673,"score_spread":0.1583987857565714,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2271923957","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0033833466,0.000634225,0.9883003,0.0006236351,0.0000545326,0.000039718358,0.000075459015,0.00016170781,0.0067271898],"genre_scores_gemma":[0.35197094,0.0032321238,0.6259631,0.0002148464,0.00029714362,0.00046852222,0.00037819907,0.00044334348,0.01703191],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902093,0.00050046167,0.000044962024,0.000076193515,0.00026292843,0.00009447161],"domain_scores_gemma":[0.99824333,0.0012641083,0.00009345887,0.00011932057,0.00023841218,0.00004152848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002355269,0.0009961535,0.0012770279,0.00071941264,0.0007025272,0.00219514,0.0016519144,0.0013583241,0.0042626024],"category_scores_gemma":[0.008865039,0.0012542892,0.0013300386,0.0016685192,0.0010813479,0.0026164327,0.0009723359,0.0034142146,0.0006419286],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019890915,0.000047284346,0.00014753203,0.00005212466,0.000022417425,0.000016097925,0.000041897005,0.81798977,0.00018571952,0.15149903,0.0024741369,0.027504092],"study_design_scores_gemma":[0.000008171002,0.000004827761,0.000051759824,0.000009780361,0.000006077167,0.0000039349143,0.000009161726,0.9335519,0.00010047319,0.06489896,0.0013508616,0.0000040435357],"about_ca_topic_score_codex":0.035420608,"about_ca_topic_score_gemma":0.03139168,"teacher_disagreement_score":0.035420608,"about_ca_system_score_codex":0.002208954,"about_ca_system_score_gemma":0.0033365455,"threshold_uncertainty_score":0.07042885},"labels":[],"label_agreement":null},{"id":"W2279777571","doi":"10.1007/s11431-011-4631-6","title":"Optimization based accurate scheduling for generation and reserve of power system","year":2011,"lang":"en","type":"article","venue":"Science China Technological Sciences","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Mathematical optimization; Scheduling (production processes); Computer science; Spinning; Electric power system; Reserve requirement; Electricity generation; Economic dispatch; Optimization problem; Power system simulation; Nonlinear programming; Control theory (sociology); Nonlinear system; Power (physics); Engineering; Mathematics; Control (management); Economics","score_opus":0.04174346538717881,"score_gpt":0.24248180368161665,"score_spread":0.20073833829443782,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2279777571","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07570279,0.00054417393,0.91691375,0.00032752933,0.0001710382,0.000073009855,0.0001341148,0.0004315194,0.005702079],"genre_scores_gemma":[0.9365137,0.00014251977,0.0615285,0.000044883527,0.000053111853,0.00006674724,0.00009484931,0.00006375246,0.0014918761],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996039,0.00016416553,0.000014881905,0.000051908286,0.00010497689,0.000060176262],"domain_scores_gemma":[0.9993825,0.00035561068,0.00006977904,0.000055324563,0.0001069658,0.000029741144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00076318864,0.00073457183,0.0013512527,0.00047967225,0.00046717818,0.00076156965,0.0005716779,0.0005078466,0.001735611],"category_scores_gemma":[0.0020410672,0.00056613865,0.00046714945,0.0006333659,0.00035603737,0.0007863902,0.00039293602,0.0007913856,0.0001779868],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031153402,0.000009334316,0.000086196735,0.000012007317,0.000006515148,0.0000084269195,0.000007586271,0.99348193,0.00026497972,0.001434636,0.0002475096,0.0044096587],"study_design_scores_gemma":[0.0000028065751,0.0000036292324,0.000033880908,4.621128e-7,0.0000011942515,0.0000010807926,7.9596714e-7,0.9994823,0.000047360238,0.00038636333,0.00003965702,5.4524446e-7],"about_ca_topic_score_codex":0.011179117,"about_ca_topic_score_gemma":0.009172018,"teacher_disagreement_score":0.011179117,"about_ca_system_score_codex":0.0010614418,"about_ca_system_score_gemma":0.0014674524,"threshold_uncertainty_score":0.022228122},"labels":[],"label_agreement":null},{"id":"W2283074482","doi":"10.1093/oso/9780199542185.003.0035","title":"Market-Based Policies for Renewable Energy Source Electricity: A Comparative Evaluation","year":2008,"lang":"en","type":"article","venue":"TSpace","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; University of British Columbia","funders":"","keywords":"Renewable energy; Electricity market; Electricity; Environmental economics; Natural resource economics; Business; Economics; Engineering; Electrical engineering","score_opus":0.03452513343112909,"score_gpt":0.2898785967482067,"score_spread":0.25535346331707764,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2283074482","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57115346,0.05860838,0.025775904,0.013332732,0.0012094943,0.0022951406,0.008954759,0.00028956198,0.31838053],"genre_scores_gemma":[0.9794725,0.009270204,0.0025289343,0.00053212955,0.00027847753,0.000532188,0.001047532,0.000064061926,0.0062740054],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98388404,0.013098506,0.0003076378,0.00042167463,0.0016550366,0.00063306774],"domain_scores_gemma":[0.9431896,0.050413862,0.0020577558,0.0016130629,0.0021598572,0.0005659056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022049183,0.0014255804,0.00206283,0.0027307721,0.0006788484,0.0030352382,0.001768153,0.0023724593,0.022599768],"category_scores_gemma":[0.035601605,0.000584037,0.0021016682,0.0032902278,0.0019670648,0.0054785185,0.0019138058,0.002502076,0.0008216614],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.041988313,0.0056375456,0.009195955,0.0070011965,0.0038319533,0.00022174123,0.00050937146,0.2646419,0.0005435498,0.5044214,0.034496766,0.12751035],"study_design_scores_gemma":[0.061057422,0.039005663,0.06901537,0.0041839695,0.012837582,0.00043332914,0.005228977,0.3232186,0.0045002033,0.34476334,0.13520412,0.0005513257],"about_ca_topic_score_codex":0.011922878,"about_ca_topic_score_gemma":0.00978031,"teacher_disagreement_score":0.022599768,"about_ca_system_score_codex":0.009418326,"about_ca_system_score_gemma":0.0028869265,"threshold_uncertainty_score":0.11660862},"labels":[],"label_agreement":null},{"id":"W2286133046","doi":"10.1007/s40565-016-0193-8","title":"Frequency aware robust economic dispatch","year":2016,"lang":"en","type":"article","venue":"Journal of Modern Power Systems and Clean Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"National Key Research and Development Program of China; National Natural Science Foundation of China","keywords":"Robust optimization; Mathematical optimization; Economic dispatch; Exploit; Bilinear interpolation; Computer science; Affine transformation; Optimization problem; Complementarity (molecular biology); Robustness (evolution); Electric power system; Mathematics","score_opus":0.0059508518811549555,"score_gpt":0.17252370282814086,"score_spread":0.1665728509469859,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2286133046","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005084741,0.00013932481,0.9887067,0.00008481862,0.000043375843,0.000017906175,0.000044021195,0.00010622447,0.005772968],"genre_scores_gemma":[0.8330527,0.0004629767,0.15948816,0.00009554,0.00014297747,0.00009920719,0.00021385675,0.00014797793,0.006296609],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937254,0.00019427678,0.000029971307,0.00010987876,0.00021955694,0.0000736846],"domain_scores_gemma":[0.9995302,0.0002142541,0.00008760144,0.00006012513,0.00008484746,0.000022979872],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008793037,0.0009925762,0.0012132133,0.00052609807,0.00032013954,0.0013235637,0.00108213,0.0008032879,0.0025588423],"category_scores_gemma":[0.00165431,0.00034314964,0.0007453582,0.00048160728,0.00048011486,0.0014253489,0.0010833348,0.000909685,0.00038053768],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003142263,0.000013138486,0.00009892734,0.00003044738,0.000022902108,0.0000560673,0.000012724667,0.94588643,0.0010943728,0.034027204,0.0005531491,0.0181732],"study_design_scores_gemma":[0.0000031840152,0.000007683622,0.000028787588,0.0000018264916,0.0000034697068,0.000009581255,0.0000026481737,0.99234504,0.00023446088,0.0066884086,0.00067060336,0.0000043679083],"about_ca_topic_score_codex":0.0010620336,"about_ca_topic_score_gemma":0.00084308285,"teacher_disagreement_score":0.0025588423,"about_ca_system_score_codex":0.00066697114,"about_ca_system_score_gemma":0.00068506063,"threshold_uncertainty_score":0.00856024},"labels":[],"label_agreement":null},{"id":"W2292985490","doi":"10.1109/icmla.2015.63","title":"A Data-Driven Method to Detect the Abnormal Instances in an Electricity Market","year":2015,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Electricity market; Electricity; Process (computing); Anomaly detection; Order (exchange); Computer science; Computation; Competition (biology); Electricity retailing; Business; Data mining; Algorithm; Finance; Engineering","score_opus":0.035081734338083814,"score_gpt":0.28813363223839067,"score_spread":0.25305189790030685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2292985490","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03176175,0.00016976797,0.9603435,0.00025571694,0.000087785746,0.00040961732,0.0011250401,0.004725069,0.0011218523],"genre_scores_gemma":[0.41527197,0.00013873354,0.5787706,0.00016907304,0.0000933484,0.00070516847,0.0029332815,0.00013905183,0.0017786738],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987294,0.00017083612,0.00013560028,0.00041290134,0.0004652251,0.000085926535],"domain_scores_gemma":[0.9971641,0.0013184921,0.00034994583,0.00022312663,0.00082669564,0.00011758384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015421339,0.0010208567,0.0010047317,0.0041205897,0.00057050464,0.0015272689,0.00171845,0.0011859739,0.0015529579],"category_scores_gemma":[0.0054058465,0.0004277356,0.00080573146,0.002392895,0.00040109674,0.0010323834,0.0006599023,0.0009898286,0.00076567923],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00062012736,0.0010085541,0.035224006,0.00042406842,0.0003818525,0.00090507534,0.00034836272,0.14933185,0.028275637,0.008890954,0.010594402,0.7639951],"study_design_scores_gemma":[0.00001547837,0.000049808412,0.0022317655,0.000009230675,0.000014999189,0.00013674192,0.000036847527,0.98947865,0.0039529046,0.0021984081,0.0018550731,0.000020190202],"about_ca_topic_score_codex":0.0038831334,"about_ca_topic_score_gemma":0.004887087,"teacher_disagreement_score":0.0041205897,"about_ca_system_score_codex":0.0006486208,"about_ca_system_score_gemma":0.0011864937,"threshold_uncertainty_score":0.008155704},"labels":[],"label_agreement":null},{"id":"W229373040","doi":"10.2172/900946","title":"A Regional Approach to Market Monitoring in the West","year":2006,"lang":"en","type":"report","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Office of Electricity; BC Hydro; Permitting, Siting and Analysis; Office of Electricity Delivery and Energy Reliability; Johns Hopkins University; U.S. Department of Energy","keywords":"Market power; Wholesale market; Market price; Function (biology); Economics; Business; Microeconomics; Electricity; Engineering","score_opus":0.027040149735790168,"score_gpt":0.24005459489432185,"score_spread":0.21301444515853168,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W229373040","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37296155,0.0011482976,0.5183559,0.0013347992,0.000055583834,0.00016895663,0.001439716,0.000675051,0.10386009],"genre_scores_gemma":[0.9413201,0.00059621676,0.0505963,0.000080019854,0.000030225903,0.000042520238,0.0003350591,0.00007527708,0.0069243065],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99961156,0.00014928693,0.000013231634,0.00012369253,0.00006058984,0.000041739604],"domain_scores_gemma":[0.9991411,0.0002681879,0.0003025624,0.00011836295,0.00013604354,0.000033789333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005145096,0.00031557857,0.0004072166,0.00076273497,0.00039189306,0.0015837468,0.00079804636,0.00043261398,0.005236819],"category_scores_gemma":[0.0025172483,0.00030933061,0.0004940651,0.000955909,0.0005474519,0.0018511737,0.00064350123,0.0005840623,0.00023886944],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025181822,0.00023426765,0.07299904,0.00017289049,0.0002604564,0.0007363118,0.0016063581,0.43393892,0.0068334993,0.37675852,0.0060242447,0.10018361],"study_design_scores_gemma":[0.000055019766,0.00026583314,0.047381353,0.00007254926,0.00017411349,0.00028546466,0.0011020442,0.83691055,0.0071264594,0.06036781,0.04616767,0.00009108485],"about_ca_topic_score_codex":0.04127306,"about_ca_topic_score_gemma":0.053673185,"teacher_disagreement_score":0.04127306,"about_ca_system_score_codex":0.00096254307,"about_ca_system_score_gemma":0.00083821104,"threshold_uncertainty_score":0.08206564},"labels":[],"label_agreement":null},{"id":"W2294686832","doi":"10.1109/hicss.2016.290","title":"The Engineering, Economic and Environmental Electricity Simulation Tool (E4ST): Description and an Illustration of Its Capability and Use as a Planning/Policy Analysis Tool","year":2016,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Investment (military); Computer science; Electric power transmission; Download; Economic analysis; Interconnection; Electric power; Engineering; Power (physics); Industrial engineering; Environmental economics; Systems engineering; Electrical engineering; Telecommunications; Economics","score_opus":0.009268841063584568,"score_gpt":0.21462866070619321,"score_spread":0.20535981964260863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2294686832","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019323891,0.0002988595,0.81846297,0.00074605475,0.0002394141,0.0004986757,0.022591695,0.04509625,0.09274218],"genre_scores_gemma":[0.27168193,0.0013122131,0.63010037,0.00051307684,0.00013369865,0.0018239382,0.029575469,0.011539362,0.0533199],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996408,0.000086484135,0.000029434063,0.000028368617,0.00017597576,0.00003887053],"domain_scores_gemma":[0.99892443,0.00061359536,0.00004857108,0.00013899912,0.00022049568,0.000053829262],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00088678487,0.0008971923,0.0005880506,0.00093854155,0.00038641042,0.0012645068,0.0016651035,0.0010678235,0.03677993],"category_scores_gemma":[0.0027498493,0.00058585167,0.00071546866,0.0015401475,0.00037711608,0.0014860576,0.0010254869,0.001203157,0.0064327973],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018693223,0.00020291515,0.003923194,0.0006913691,0.00007709602,0.0003180305,0.00020396613,0.68950707,0.004499807,0.04378948,0.1400175,0.11658254],"study_design_scores_gemma":[0.00014777255,0.000050216986,0.0006534441,0.00007686625,0.00001729084,0.00018350944,0.000043770677,0.82447064,0.0039759153,0.013466367,0.15685828,0.00005587058],"about_ca_topic_score_codex":0.008825689,"about_ca_topic_score_gemma":0.011250054,"teacher_disagreement_score":0.03677993,"about_ca_system_score_codex":0.00048442296,"about_ca_system_score_gemma":0.0015377129,"threshold_uncertainty_score":0.12304115},"labels":[],"label_agreement":null},{"id":"W2298753630","doi":"10.19030/jber.v10i2.6791","title":"Competitive Entry In Ontarios Deregulated Power Generation Industry","year":2012,"lang":"en","type":"article","venue":"Journal of Business & Economics Research (JBER)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Acadia University","funders":"","keywords":"Deregulation; Outcome (game theory); Market power; Microeconomics; Electricity market; Economics; Production (economics); Industrial organization; Risk aversion (psychology); Perfect competition; Electricity; Electric power industry; Business; Expected utility hypothesis; Market economy; Financial economics; Monopoly","score_opus":0.043526807833867705,"score_gpt":0.2771341249198647,"score_spread":0.23360731708599702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2298753630","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9425434,0.00017291935,0.0023714511,0.0009925043,0.000013625438,0.000065745306,0.00016112093,0.000014012808,0.05366523],"genre_scores_gemma":[0.9945293,0.00008863629,0.0003881785,0.000047139794,0.0000051172074,0.000009898203,0.000046816862,0.0000021205492,0.0048827273],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9989931,0.00022230245,0.000020762373,0.000108916516,0.00026274164,0.00039219312],"domain_scores_gemma":[0.99867624,0.00055582705,0.00028038895,0.00004182441,0.00021000263,0.00023567339],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094095065,0.0001314276,0.00047056595,0.00040632067,0.0015147446,0.0031264548,0.0007124141,0.0009232197,0.0067672413],"category_scores_gemma":[0.0026533257,0.00019217472,0.00038854717,0.0005105822,0.0011825333,0.0011865541,0.0009631948,0.00060398417,0.0002245859],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016685431,0.00053776713,0.07125354,0.00027283348,0.000115725656,0.0074354657,0.007190029,0.16259949,0.010053442,0.6793657,0.009640765,0.049866706],"study_design_scores_gemma":[0.0011527081,0.0009527181,0.1422704,0.00019154302,0.00012667986,0.0013618668,0.017079646,0.56494457,0.004956594,0.17201662,0.09465106,0.0002956396],"about_ca_topic_score_codex":0.22983041,"about_ca_topic_score_gemma":0.49254298,"teacher_disagreement_score":0.7701696,"about_ca_system_score_codex":0.0095492955,"about_ca_system_score_gemma":0.006240854,"threshold_uncertainty_score":0.4569853},"labels":[],"label_agreement":null},{"id":"W2313732016","doi":"10.1541/ieejpes.133.770","title":"A Count Model Analysis of the Traded Contracts in JEPX Forward Market","year":2013,"lang":"en","type":"article","venue":"IEEJ Transactions on Power and Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nutrasource","funders":"","keywords":"Overdispersion; Econometrics; Negative binomial distribution; Spot contract; Count data; Forward rate; Forward contract; Forward price; Carry (investment); Zero (linguistics); Rest (music); Economics; Mathematics; Statistics; Financial economics; Interest rate; Poisson distribution; Monetary economics; Finance","score_opus":0.0034605722430842596,"score_gpt":0.16652726569980966,"score_spread":0.1630666934567254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2313732016","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.60871994,0.00051072874,0.38227972,0.0008442502,0.00005702633,0.00012099421,0.00066240213,0.00026668748,0.006538251],"genre_scores_gemma":[0.97490615,0.00029680724,0.015644584,0.000061501916,0.000040280047,0.0001203707,0.00063799974,0.00006484458,0.008227426],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99832827,0.00081491383,0.000067692126,0.00029538746,0.00024868097,0.000245036],"domain_scores_gemma":[0.99216205,0.0059040175,0.0008320423,0.0002304497,0.00070716307,0.00016428367],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004735511,0.0009554028,0.0013357971,0.001512126,0.0005926029,0.0021577699,0.0020691366,0.0012279972,0.0046702246],"category_scores_gemma":[0.011322303,0.0006004806,0.0016508547,0.0011901656,0.0009011423,0.0026664622,0.0009363403,0.0019457883,0.00041262028],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037508638,0.00014975946,0.0169987,0.00012866671,0.00018800351,0.0004662391,0.00032787505,0.86145663,0.002197702,0.09450682,0.0016563468,0.021548107],"study_design_scores_gemma":[0.000004048333,0.000023350085,0.0009511611,0.0000031918935,0.000012492406,0.00002038603,0.000025691808,0.9955539,0.00010721615,0.0031374982,0.00015278635,0.000008307471],"about_ca_topic_score_codex":0.012339691,"about_ca_topic_score_gemma":0.0054732524,"teacher_disagreement_score":0.012339691,"about_ca_system_score_codex":0.0013653043,"about_ca_system_score_gemma":0.0012880451,"threshold_uncertainty_score":0.025044084},"labels":[],"label_agreement":null},{"id":"W2314346896","doi":"10.2316/journal.203.2012.3.203-4930","title":"A HYBRID LR-FA TECHNIQUE TO OPTIMIZE THE PROFIT FUNCTION OF GENCOS IN A RESTRUCTURED POWER SYSTEM","year":2012,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Profit (economics); Function (biology); Business; Operations research; Industrial organization; Economics; Microeconomics; Mathematics; Cell biology; Biology","score_opus":0.003990492100511694,"score_gpt":0.19583064126444383,"score_spread":0.19184014916393213,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2314346896","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07036188,0.0004585163,0.92284685,0.00011363686,0.000050551673,0.00003456743,0.000038907263,0.0004063551,0.0056886636],"genre_scores_gemma":[0.8476362,0.00013589385,0.14911711,0.000054063858,0.000034365963,0.00006911873,0.000043887467,0.00004995414,0.0028594476],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99985504,0.000053075662,0.000005847068,0.00002310074,0.00003813218,0.00002478253],"domain_scores_gemma":[0.999821,0.000086825276,0.00002257539,0.000019312516,0.00003982903,0.000010528361],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047958604,0.00064112124,0.00075615896,0.00041292683,0.00034660997,0.00050987455,0.0007442995,0.0006407468,0.002160374],"category_scores_gemma":[0.00064258295,0.0003151288,0.00058502366,0.00050328014,0.00025807653,0.0005350814,0.0003694283,0.00040176744,0.00024144979],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006954577,0.000031843898,0.00033372483,0.000056311343,0.00004295039,0.00009027537,0.000032804604,0.9368624,0.005014325,0.0017937664,0.00046315897,0.05520887],"study_design_scores_gemma":[0.000005466576,0.000038149115,0.000084168714,0.0000028742754,0.0000075036573,0.00001801698,0.000005081055,0.9988348,0.00044262127,0.00035767903,0.00020103662,0.0000026341847],"about_ca_topic_score_codex":0.0034963456,"about_ca_topic_score_gemma":0.0049549635,"teacher_disagreement_score":0.0034963456,"about_ca_system_score_codex":0.0003199479,"about_ca_system_score_gemma":0.00047332136,"threshold_uncertainty_score":0.0072271824},"labels":[],"label_agreement":null},{"id":"W2318760440","doi":"10.2139/ssrn.2756618","title":"Measuring Demand Responses to Wholesale Electricity Prices Using Market Power Indices","year":2016,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Market power; Electricity market; Wholesale market; Electricity; Economics; Demand response; Business; Electricity demand; Industrial organization; Econometrics; Microeconomics; Commerce; Power (physics); Monetary economics; Agricultural economics; Electricity generation; Electrical engineering; Engineering; Monopoly","score_opus":0.011197637838685751,"score_gpt":0.21450162654496993,"score_spread":0.2033039887062842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2318760440","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96822137,0.000047230194,0.022912314,0.00010983883,0.000040563627,0.000045875884,0.0007548015,0.0002967063,0.007571416],"genre_scores_gemma":[0.99521893,0.000025290241,0.0037769577,0.00001148115,0.000009922348,0.000013695336,0.0004013004,0.000024022405,0.0005183053],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943024,0.00017370381,0.000042800384,0.00008097839,0.0002288903,0.00004346718],"domain_scores_gemma":[0.99867284,0.00071677944,0.0002050142,0.00012336312,0.00023597777,0.0000460556],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005476925,0.000590162,0.00038122866,0.0009720553,0.00017452969,0.0009298664,0.00038260253,0.0004006512,0.0022671053],"category_scores_gemma":[0.0033599236,0.00033953847,0.00030575471,0.0016246886,0.00017217448,0.0011298175,0.00030827546,0.0005939552,0.0006866104],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019697838,0.0013295249,0.35125768,0.0004704537,0.00064473983,0.00049255,0.0006138712,0.2889648,0.14011647,0.006493585,0.0069172764,0.20072922],"study_design_scores_gemma":[0.0000695932,0.0005380679,0.1716463,0.000013649248,0.00009865283,0.00018943845,0.0003938842,0.7916342,0.031240635,0.002234647,0.0018779499,0.00006293581],"about_ca_topic_score_codex":0.0017666741,"about_ca_topic_score_gemma":0.0037637684,"teacher_disagreement_score":0.0022671053,"about_ca_system_score_codex":0.00032590653,"about_ca_system_score_gemma":0.00017282186,"threshold_uncertainty_score":0.0075841546},"labels":[],"label_agreement":null},{"id":"W2321944543","doi":"10.1109/tste.2014.2339172","title":"Optimal Incentive Design for Targeted Penetration of Renewable Energy Sources","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"IBM Canada; ABB","keywords":"Renewable energy; Incentive; Environmental economics; Energy conservation; Portfolio; Time horizon; Electricity; Market penetration; Wind power; Electricity generation; Distributed generation; Business; Economics; Engineering; Microeconomics; Finance","score_opus":0.005932198490464514,"score_gpt":0.18739253293411784,"score_spread":0.18146033444365334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2321944543","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18150464,0.0004715006,0.78618526,0.0008583982,0.00007206999,0.00036904885,0.0003127185,0.00024367996,0.0299826],"genre_scores_gemma":[0.9600166,0.00015826756,0.03604607,0.00005523541,0.000008955666,0.00014356984,0.00005154834,0.00003204167,0.0034877874],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994294,0.00025755604,0.000013107383,0.00008637074,0.0000755831,0.00013797608],"domain_scores_gemma":[0.9986493,0.0008556717,0.00017693808,0.000035293982,0.00016146754,0.000121402074],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015995282,0.0008158086,0.0011329672,0.0005286557,0.0003467425,0.0012510624,0.0008732325,0.0011809185,0.0047073695],"category_scores_gemma":[0.0042014956,0.0008988304,0.00043688543,0.0004036541,0.0007609918,0.0010020989,0.0010453202,0.0009894044,0.00024791717],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005053791,0.000024285568,0.0001743906,0.000021304188,0.0000071851696,0.000027878079,0.000012414209,0.98930043,0.0004173511,0.0065395366,0.00022236956,0.0032022821],"study_design_scores_gemma":[0.0000149272455,0.00002554139,0.00007056772,0.000004196837,0.000004012823,0.0000038489975,0.000008984376,0.9975677,0.00011679163,0.001957914,0.00022272192,0.0000028221814],"about_ca_topic_score_codex":0.008565718,"about_ca_topic_score_gemma":0.008599808,"teacher_disagreement_score":0.008565718,"about_ca_system_score_codex":0.0023192049,"about_ca_system_score_gemma":0.0029615008,"threshold_uncertainty_score":0.01703173},"labels":[],"label_agreement":null},{"id":"W2330052553","doi":"10.18178/ijoee.3.3.145-150","title":"Quarter-Hourly Generation Scheduling of Hydropower Systems Considering Peak Saving Demands among Multiple Provincial Power Grids in Central China","year":2015,"lang":"en","type":"article","venue":"International Journal of Electrical Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Hydropower; China; Environmental science; Scheduling (production processes); Environmental economics; Operations research; Operations management; Engineering; Economics; Geography; Electrical engineering","score_opus":0.008317006959677624,"score_gpt":0.20986122981600674,"score_spread":0.2015442228563291,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2330052553","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99577385,0.000055672077,0.0025156555,0.00015696525,0.000014462985,0.000016770013,0.00014277654,0.000035421665,0.0012884787],"genre_scores_gemma":[0.99912125,0.000016828233,0.00039035184,0.000004941234,0.0000030480087,0.0000040027853,0.00006077042,0.0000032198145,0.00039559402],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99958724,0.00010533003,0.000015994949,0.000058240817,0.000050205956,0.00018311045],"domain_scores_gemma":[0.9991762,0.00026972994,0.00010605503,0.000036095593,0.00019581582,0.00021609079],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008892035,0.0005522952,0.0008206618,0.00053304643,0.0010405629,0.0010251367,0.0010558164,0.0007048106,0.0019653442],"category_scores_gemma":[0.0011697692,0.0004917713,0.0005011556,0.000736947,0.0005043948,0.0006826854,0.00045710083,0.00044642153,0.00008651424],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038883707,0.000109391774,0.0147921555,0.000037046044,0.000073027506,0.00043300164,0.000115575014,0.9753244,0.001054596,0.0010995442,0.0010488088,0.0055237412],"study_design_scores_gemma":[0.000028217557,0.000043184664,0.0100325225,0.000002228782,0.000024595016,0.000015549858,0.00027038023,0.9887455,0.00022833707,0.00047118694,0.00012855786,0.000009708004],"about_ca_topic_score_codex":0.21263616,"about_ca_topic_score_gemma":0.20613302,"teacher_disagreement_score":0.21263616,"about_ca_system_score_codex":0.0031163634,"about_ca_system_score_gemma":0.003954365,"threshold_uncertainty_score":0.42279696},"labels":[],"label_agreement":null},{"id":"W2330665928","doi":"10.2316/journal.203.2013.2.203-4954","title":"SHORT-TERM HYDROTHERMAL SCHEDULING CONSIDERING VALVE POINT EFFECT USING ACCELERATION-BASED PSO ALGORITHM","year":2013,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Acceleration; Term (time); Scheduling (production processes); Hydrothermal circulation; Computer science; Algorithm; Control theory (sociology); Mathematical optimization; Mathematics; Engineering; Artificial intelligence; Physics; Chemical engineering; Control (management)","score_opus":0.007882445205234663,"score_gpt":0.22483631219926137,"score_spread":0.21695386699402672,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2330665928","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2251623,0.00083431415,0.76362973,0.0003534879,0.0002776664,0.000101285535,0.000082783765,0.00023765278,0.009320762],"genre_scores_gemma":[0.9764629,0.00011016874,0.022330277,0.000017121663,0.000039564602,0.000033902415,0.00003159191,0.000013633849,0.0009608227],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998053,0.00005390638,0.0000103943,0.000039490576,0.00004823279,0.000042666892],"domain_scores_gemma":[0.9995492,0.00022189757,0.000058988186,0.00001917186,0.000092287344,0.00005838497],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005242789,0.0005647796,0.0013722393,0.0003801414,0.00041966475,0.0007909716,0.0007459205,0.00070965756,0.0014611502],"category_scores_gemma":[0.0010902315,0.0003433157,0.0005969051,0.0005244321,0.00032703197,0.0005592206,0.0004478624,0.0006010205,0.00010559478],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000069921356,0.000025114738,0.00035072048,0.000030902618,0.000023911869,0.000040443996,0.000013855001,0.9899615,0.0008444359,0.0008514181,0.00023094709,0.007556805],"study_design_scores_gemma":[0.00000797985,0.00001814695,0.00008336554,9.0210324e-7,0.0000045355955,0.0000032227063,0.0000029179964,0.99963045,0.000060978044,0.00013880292,0.000047055197,0.0000015532562],"about_ca_topic_score_codex":0.009659929,"about_ca_topic_score_gemma":0.0065183816,"teacher_disagreement_score":0.009659929,"about_ca_system_score_codex":0.00046856364,"about_ca_system_score_gemma":0.0011200695,"threshold_uncertainty_score":0.019207358},"labels":[],"label_agreement":null},{"id":"W2334836146","doi":"10.2316/journal.203.2011.2.203-4496","title":"PROFIT–BASED UNIT COMMITMENT PROBLEM WITH BILATERAL CONTRACTS","year":2011,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Power system simulation; Mathematical optimization; Profit (economics); Linear programming; Integer programming; Computer science; Binary number; Dual (grammatical number); Unit (ring theory); Operations research; Power (physics); Electric power system; Economics; Mathematics; Microeconomics","score_opus":0.010265113409197208,"score_gpt":0.19099602873817167,"score_spread":0.18073091532897448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2334836146","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.079953454,0.00076925056,0.88607913,0.0013386433,0.00013284734,0.00028376895,0.0004548757,0.00023231756,0.030755693],"genre_scores_gemma":[0.93213713,0.00036828074,0.0552652,0.0001037086,0.0000610833,0.0002840918,0.00022492764,0.00008393974,0.011471513],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983828,0.0008004061,0.000052809977,0.00020726088,0.0003357336,0.00022099406],"domain_scores_gemma":[0.99891496,0.00067833276,0.00012620412,0.00006058909,0.00010132703,0.000118610034],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023615595,0.0011305248,0.0015269346,0.0004377653,0.000622167,0.0018640842,0.0021506883,0.0020463802,0.005953972],"category_scores_gemma":[0.003321992,0.00066315767,0.0006271098,0.001159914,0.0007765479,0.0023811609,0.0017148881,0.0018479581,0.00052375195],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009023387,0.000054567678,0.00016857457,0.000063079366,0.000028535753,0.00013959243,0.000049556907,0.95248556,0.0004981244,0.032235783,0.0010217181,0.013164647],"study_design_scores_gemma":[0.000024627725,0.000030309146,0.000064140724,0.0000053182007,0.000005695485,0.00003898897,0.000020967042,0.9831186,0.00017894775,0.015733827,0.00077028794,0.000008266123],"about_ca_topic_score_codex":0.003427799,"about_ca_topic_score_gemma":0.0030888182,"teacher_disagreement_score":0.005953972,"about_ca_system_score_codex":0.0016490167,"about_ca_system_score_gemma":0.0019480851,"threshold_uncertainty_score":0.019918025},"labels":[],"label_agreement":null},{"id":"W2343330772","doi":"10.1109/tpwrs.2015.2512990","title":"Energy-Centric Flexibility Management in Power Systems","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":58,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Group for Research in Decision Analysis","funders":"","keywords":"Flexibility (engineering); Electric power system; Renewable energy; Energy storage; Reliability engineering; Computer science; Exploit; Demand response; Electricity generation; Energy management; Power management; Power (physics); Risk analysis (engineering); Environmental economics; Engineering; Energy (signal processing); Business; Electrical engineering; Economics; Electricity; Computer security","score_opus":0.008500344302315548,"score_gpt":0.20198371306668708,"score_spread":0.19348336876437153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2343330772","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04163965,0.0023287495,0.93176204,0.0011516964,0.00009166166,0.000049768045,0.000092495175,0.00020326237,0.022680715],"genre_scores_gemma":[0.9689178,0.00084218313,0.027938846,0.00006166773,0.00008085185,0.00004046151,0.000032691314,0.000028138278,0.0020574287],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906176,0.00041056165,0.000064882704,0.00014031395,0.00023137698,0.000091030335],"domain_scores_gemma":[0.99941134,0.00028021642,0.00010788109,0.00009515154,0.000066937,0.00003836522],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013609515,0.00060969504,0.00048102732,0.00045293194,0.00042276774,0.002157391,0.00097093027,0.00069079257,0.0013812121],"category_scores_gemma":[0.0018929034,0.0002756037,0.00040684603,0.00097511726,0.0012502434,0.0025993972,0.0013458432,0.0010476594,0.00019537976],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045893066,0.000021856855,0.00036373385,0.00007776802,0.0000306625,0.00016592158,0.0001567566,0.65772724,0.0020657554,0.29881924,0.00084233395,0.039682876],"study_design_scores_gemma":[0.000010575068,0.00005473279,0.00034568604,0.000030646468,0.00001184191,0.000068662666,0.000077818055,0.7828135,0.00073321245,0.21085489,0.004975335,0.00002317583],"about_ca_topic_score_codex":0.0012796231,"about_ca_topic_score_gemma":0.0013188777,"teacher_disagreement_score":0.002157391,"about_ca_system_score_codex":0.0011063362,"about_ca_system_score_gemma":0.0005339027,"threshold_uncertainty_score":0.008027077},"labels":[],"label_agreement":null},{"id":"W2343534374","doi":"10.1109/pes.2009.5275410","title":"A planning model for investor firms in the generation sector and financial analysis","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Time horizon; Electricity; Volatility (finance); Electricity market; Investment (military); Electricity generation; Rate of return; Business; Return on investment; Industrial organization; Finance; Economics; Environmental economics; Microeconomics; Engineering; Production (economics)","score_opus":0.023887201782547152,"score_gpt":0.22728294914386243,"score_spread":0.20339574736131527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2343534374","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038749926,0.00088070135,0.90818405,0.002301879,0.0000893352,0.00015165389,0.0012673594,0.00032213394,0.048052937],"genre_scores_gemma":[0.8154835,0.0017478381,0.13971952,0.0002169032,0.00010520069,0.0005112873,0.0007579638,0.00010387081,0.04135394],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966455,0.00013249578,0.000013452396,0.00006357636,0.00006619323,0.000059816462],"domain_scores_gemma":[0.9996244,0.0002032558,0.00005636679,0.00002152076,0.000046277793,0.000048288075],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000784589,0.0009128851,0.0007143622,0.000469755,0.00066446565,0.002148758,0.0014484118,0.0021344472,0.0070326296],"category_scores_gemma":[0.0012989802,0.00059965526,0.0007300434,0.0011726252,0.0006896806,0.0020510529,0.00083585654,0.0015114509,0.000605933],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018125882,0.000015992848,0.00017741045,0.000018121407,0.000007902474,0.00013336052,0.00003199416,0.9160099,0.00022809407,0.07906678,0.0008689085,0.0034234708],"study_design_scores_gemma":[0.000011947481,0.0000139231615,0.00007882826,0.000007836142,0.0000067185424,0.000032636024,0.000025558547,0.97759694,0.00007785678,0.019620316,0.0025201254,0.000007321564],"about_ca_topic_score_codex":0.015835876,"about_ca_topic_score_gemma":0.013620816,"teacher_disagreement_score":0.015835876,"about_ca_system_score_codex":0.0021885515,"about_ca_system_score_gemma":0.0028869223,"threshold_uncertainty_score":0.031487405},"labels":[],"label_agreement":null},{"id":"W2345202997","doi":"10.5281/zenodo.47452","title":"assigner: easier gsi_sim install","year":2016,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Computer science","score_opus":0.016598232701686363,"score_gpt":0.1966305527669061,"score_spread":0.18003232006521974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2345202997","genre_codex":"software","genre_gemma":"software","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"software","genre_consensus":"software","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017830984,0.00011637333,0.054532763,0.0002783677,0.00027801417,0.0002017262,0.02906501,0.81840163,0.09534295],"genre_scores_gemma":[0.031101499,0.0002379885,0.04671993,0.00094519235,0.00035382403,0.00071148464,0.08272838,0.66035026,0.17685153],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989042,0.00011716109,0.00006475256,0.00028202037,0.0004053022,0.00022650968],"domain_scores_gemma":[0.9972832,0.00049641094,0.00014336983,0.0010079513,0.0008459849,0.00022300202],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000994873,0.004113573,0.0015427124,0.0031607042,0.0008055046,0.0020792482,0.0035371988,0.0010006097,0.6706252],"category_scores_gemma":[0.0062323515,0.002421226,0.0021816178,0.002337491,0.0005215175,0.003404225,0.0030945688,0.0025105951,0.5129119],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002611608,0.000071765615,0.0005483076,0.0003236617,0.000048356633,0.00005589048,0.00008456499,0.0015418227,0.0016972703,0.0021081152,0.9330049,0.060254138],"study_design_scores_gemma":[0.00045132445,0.00006118722,0.0024236797,0.00011930747,0.00007251618,0.00019782977,0.000065769316,0.011092166,0.026422624,0.0070861275,0.95183206,0.00017540525],"about_ca_topic_score_codex":0.004436536,"about_ca_topic_score_gemma":0.00490313,"teacher_disagreement_score":0.6706252,"about_ca_system_score_codex":0.001989526,"about_ca_system_score_gemma":0.0011308521,"threshold_uncertainty_score":0.46981317},"labels":[],"label_agreement":null},{"id":"W2351307490","doi":"10.5547/01956574.37.2.ddup","title":"Short-term Hedging for an Electricity Retailer","year":2015,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Stylized fact; Futures contract; Spot contract; Electricity market; Electricity; Economics; Spot market; Term (time); Database transaction; Econometrics; Financial economics; Microeconomics; Computer science","score_opus":0.029961928701228838,"score_gpt":0.24204245817883469,"score_spread":0.21208052947760586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2351307490","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24025711,0.00020536232,0.7517594,0.0002449878,0.00005365423,0.00009443437,0.00015032898,0.0006983507,0.006536436],"genre_scores_gemma":[0.9062474,0.00010574914,0.08816615,0.000030928397,0.000019066902,0.00004040091,0.00023705383,0.00007267179,0.005080683],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996754,0.0000990644,0.000014932401,0.0000663097,0.0001069439,0.000037472877],"domain_scores_gemma":[0.9995474,0.00019922077,0.00003061543,0.00009988287,0.00009395933,0.00002876484],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001261049,0.0005893964,0.00071366713,0.0002764698,0.00040819347,0.0009722979,0.0006972688,0.0007080684,0.002868964],"category_scores_gemma":[0.0017569178,0.00031293518,0.0006676659,0.00039763347,0.00043600472,0.0010789093,0.00077576085,0.0009563541,0.0003716247],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016907758,0.00005038165,0.0019599749,0.000023622955,0.000028389535,0.00016841631,0.00004879196,0.9466656,0.0038908173,0.009515532,0.00081689225,0.03666257],"study_design_scores_gemma":[0.0000071003938,0.000057541423,0.00033947628,0.0000016967712,0.000008203871,0.0000339341,0.000013445056,0.99540895,0.0016126145,0.0020816505,0.0004269734,0.0000084138455],"about_ca_topic_score_codex":0.0040803016,"about_ca_topic_score_gemma":0.004209917,"teacher_disagreement_score":0.0040803016,"about_ca_system_score_codex":0.0006566375,"about_ca_system_score_gemma":0.0010330727,"threshold_uncertainty_score":0.0095975995},"labels":[],"label_agreement":null},{"id":"W2364092517","doi":"","title":"Incorporating Reliability Component in Transmission Service Rate Design","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Ministry of Education and Child Care","funders":"","keywords":"Wheeling; Component (thermodynamics); Reliability (semiconductor); Reliability engineering; Transmission system; Transmission (telecommunications); Computer science; Investment (military); Incentive; Engineering; Economics; Telecommunications; Power (physics); Microeconomics","score_opus":0.008181634598021672,"score_gpt":0.18458770764470253,"score_spread":0.17640607304668085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2364092517","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002591442,0.000035894725,0.99544746,0.000034828205,0.000022151607,0.000036688903,0.000007339635,0.0001759417,0.0016481746],"genre_scores_gemma":[0.23123845,0.00022876583,0.76355094,0.00005032824,0.00009894462,0.00017600322,0.000054964195,0.00036010824,0.0042415285],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9960401,0.0016958389,0.00014604177,0.0003016547,0.0016574011,0.00015892253],"domain_scores_gemma":[0.9955817,0.002347739,0.0003469467,0.00038779186,0.0012474267,0.00008846174],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0047349036,0.0010059496,0.00083663507,0.0014546362,0.00045830023,0.0014101934,0.0014315071,0.0007987543,0.0036137907],"category_scores_gemma":[0.013612907,0.00081896223,0.0010360245,0.00083295366,0.0007972038,0.0024337093,0.00091428176,0.0018393602,0.0010833875],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011622661,0.000109427376,0.0010541683,0.00012671843,0.000050747087,0.00011859891,0.00018831593,0.70882106,0.00768643,0.0777892,0.0012747812,0.20266427],"study_design_scores_gemma":[0.000022042319,0.00010219781,0.00012646997,0.000013546881,0.00002480706,0.000076162876,0.000013164995,0.98364925,0.0028153462,0.008570745,0.0045627034,0.000023540355],"about_ca_topic_score_codex":0.0032143996,"about_ca_topic_score_gemma":0.0022765354,"teacher_disagreement_score":0.0047349036,"about_ca_system_score_codex":0.0011125527,"about_ca_system_score_gemma":0.0013342623,"threshold_uncertainty_score":0.025040865},"labels":[],"label_agreement":null},{"id":"W236455485","doi":"","title":"Performance-Based Regulation of Utilities","year":2002,"lang":"en","type":"article","venue":"Energy law journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Commission; Incentive; Service (business); Deregulation; Economics; Energy law; Public economics; Business; Finance; Law; Political science; Economy; Microeconomics","score_opus":0.008057371707353957,"score_gpt":0.1564940778776822,"score_spread":0.14843670617032823,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W236455485","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023604015,0.009824226,0.08859909,0.015300114,0.00067996647,0.00024119677,0.00082863774,0.0005529548,0.8603698],"genre_scores_gemma":[0.8816711,0.007962089,0.018243596,0.004099697,0.0014398209,0.00040676977,0.00048614465,0.00010814467,0.08558271],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.98956186,0.0030956732,0.00045480608,0.0012536204,0.004510499,0.0011236037],"domain_scores_gemma":[0.99256986,0.003408209,0.0011349157,0.00089442387,0.0017773549,0.000215228],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044126743,0.00057070615,0.00038189744,0.001359151,0.0011532942,0.0058179707,0.0015257137,0.0032597214,0.012170508],"category_scores_gemma":[0.010877084,0.00030878815,0.0006864589,0.002086702,0.004316952,0.0029205407,0.001830562,0.0031221479,0.001855301],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013945301,0.000018792514,0.00049127714,0.00007132701,0.0000044892236,0.0000291138,0.00015726754,0.005075947,0.00027203702,0.96459275,0.009476702,0.019796308],"study_design_scores_gemma":[0.000026604817,0.00021775176,0.0040587923,0.00087974436,0.000027584389,0.00019699795,0.0003269423,0.016074795,0.0019776549,0.5598525,0.41626847,0.0000921431],"about_ca_topic_score_codex":0.006697278,"about_ca_topic_score_gemma":0.002961985,"teacher_disagreement_score":0.012170508,"about_ca_system_score_codex":0.00697109,"about_ca_system_score_gemma":0.004117859,"threshold_uncertainty_score":0.05057907},"labels":[],"label_agreement":null},{"id":"W2375113873","doi":"","title":"Energy efficiency technologies in Canada","year":2011,"lang":"en","type":"article","venue":"Power Demand Side Management","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Energy conservation; Energy security; Hydroelectricity; Business; Context (archaeology); Government (linguistics); Environmental economics; Renewable energy; Natural resource economics; Wind power; Economic shortage; Natural resource; Environmental resource management; Economics; Engineering; Political science; Geography","score_opus":0.00526229475731108,"score_gpt":0.15182498552619073,"score_spread":0.14656269076887965,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2375113873","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025856664,0.010851586,0.0069266404,0.013244427,0.00051523803,0.00017226016,0.0027168116,0.00030657693,0.9394098],"genre_scores_gemma":[0.31540272,0.018857375,0.013899407,0.0019811809,0.00009024693,0.00012490914,0.002426514,0.00020513982,0.6470125],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99846363,0.000066834764,0.00003823793,0.00010483904,0.001006417,0.00032008623],"domain_scores_gemma":[0.9984106,0.00007333424,0.00003538408,0.00004763565,0.0012310353,0.00020202844],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00083674863,0.00036103808,0.00023185526,0.0019441452,0.0040597925,0.0032527556,0.0009858063,0.00069617626,0.02286224],"category_scores_gemma":[0.0019707098,0.00023201625,0.00035027793,0.004397966,0.0007857569,0.00089810195,0.0009713633,0.0010123338,0.002001276],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006366352,0.00012267336,0.005538494,0.00026027326,0.000018483446,0.00027469447,0.00068558805,0.005570632,0.0017440356,0.49250388,0.18974102,0.3034766],"study_design_scores_gemma":[0.0000125074785,0.000023505148,0.01455349,0.00013119573,0.000009210096,0.0000976409,0.0005908619,0.0032569696,0.0009359316,0.008945886,0.97141236,0.000030503705],"about_ca_topic_score_codex":0.98123527,"about_ca_topic_score_gemma":0.9879167,"teacher_disagreement_score":0.07056804,"about_ca_system_score_codex":0.07056804,"about_ca_system_score_gemma":0.12145765,"threshold_uncertainty_score":0.5120094},"labels":[],"label_agreement":null},{"id":"W2414932321","doi":"10.1016/j.ifacol.2015.08.205","title":"Predicting Electricity Pool Prices Using Hidden Markov Models∗∗This work is supported in part by NSERC and AITF.","year":2015,"lang":"en","type":"article","venue":"IFAC-PapersOnLine","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Hidden Markov model; Electricity price forecasting; Electricity price; Econometrics; Electricity; Electricity market; Work (physics); Operator (biology); Preprocessor; Markov chain; Economics; Computer science; Spot contract; Operations research; Engineering; Financial economics; Artificial intelligence; Machine learning","score_opus":0.019430646686132664,"score_gpt":0.22124764217182916,"score_spread":0.20181699548569648,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2414932321","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46347722,0.00037902943,0.5301915,0.00062100793,0.000062794956,0.00004200676,0.0005402856,0.00060949655,0.004076676],"genre_scores_gemma":[0.9850579,0.00012228997,0.012196596,0.00002876082,0.000019547408,0.000019506793,0.00037708686,0.000015296813,0.0021630027],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99984884,0.000051288855,0.0000059824833,0.000037963437,0.00002941622,0.000026449678],"domain_scores_gemma":[0.9993569,0.00049523765,0.000063369356,0.000020990608,0.000045048662,0.000018400584],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005246796,0.0004969337,0.00047315744,0.00023678286,0.00022169924,0.00063385506,0.0005239238,0.00042376536,0.0013601157],"category_scores_gemma":[0.0015669761,0.0003706351,0.0004270711,0.00031011223,0.00025400694,0.0007883969,0.0003148576,0.0007055512,0.00022457648],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003809548,0.000023725413,0.0013274292,0.000010318964,0.000017949407,0.000023696877,0.000013431335,0.9884724,0.00035888987,0.0015499518,0.00024082298,0.00792323],"study_design_scores_gemma":[0.0000016990294,0.000004249346,0.00022177999,6.4052216e-7,0.0000016368697,9.668174e-7,0.0000012369487,0.9990625,0.000080209335,0.0005964959,0.000027328866,0.0000013111252],"about_ca_topic_score_codex":0.031005103,"about_ca_topic_score_gemma":0.033527374,"teacher_disagreement_score":0.031005103,"about_ca_system_score_codex":0.0006062071,"about_ca_system_score_gemma":0.00082394417,"threshold_uncertainty_score":0.061649263},"labels":[],"label_agreement":null},{"id":"W2419231748","doi":"10.1016/j.energy.2016.05.018","title":"Inexact stochastic risk-aversion optimal day-ahead dispatch model for electricity system management with wind power under uncertainty","year":2016,"lang":"en","type":"article","venue":"Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"China Postdoctoral Science Foundation; National Natural Science Foundation of China","keywords":"Economic dispatch; Stochastic programming; Electricity market; Wind power; Electric power system; Electricity; Demand response; Mathematical optimization; Computer science; Interval (graph theory); Robust optimization; Operations research; Risk management; Reliability engineering; Engineering; Power (physics); Economics; Finance; Mathematics","score_opus":0.004602122078304065,"score_gpt":0.17813763044576372,"score_spread":0.17353550836745965,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2419231748","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09834038,0.00072191795,0.88940036,0.0013918743,0.00024236958,0.00009252683,0.00041030525,0.0002678844,0.009132375],"genre_scores_gemma":[0.97982657,0.00021818963,0.014183309,0.00010035876,0.000049778842,0.00008415113,0.00016745973,0.00004685485,0.005323283],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99894553,0.00050316687,0.00004871889,0.00015852958,0.00020530383,0.00013876575],"domain_scores_gemma":[0.9976368,0.0015145128,0.0002923745,0.00009093743,0.00028082356,0.00018465168],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002495003,0.0013661211,0.0026298272,0.000550688,0.00058339245,0.0022908312,0.0015512996,0.0025957737,0.002466759],"category_scores_gemma":[0.005363777,0.0014360176,0.00089124776,0.00076265243,0.0016106985,0.001833359,0.0015976751,0.002875552,0.00024673154],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018182742,0.0000068784066,0.000052644733,0.000008401584,0.000009694383,0.000016867783,0.0000063885286,0.9971199,0.0000505792,0.002179841,0.00010286863,0.0004278558],"study_design_scores_gemma":[0.0000032830396,0.000005061498,0.000021965754,8.864169e-7,0.000001913215,0.0000013098719,0.0000012958787,0.99918085,0.000012918728,0.00074555824,0.0000232354,0.0000017616607],"about_ca_topic_score_codex":0.011674619,"about_ca_topic_score_gemma":0.0071506826,"teacher_disagreement_score":0.011674619,"about_ca_system_score_codex":0.0014767935,"about_ca_system_score_gemma":0.0021163328,"threshold_uncertainty_score":0.023213327},"labels":[],"label_agreement":null},{"id":"W2461023523","doi":"10.1007/s11149-017-9323-0","title":"Electricity market mergers with endogenous forward contracting","year":2017,"lang":"en","type":"article","venue":"Journal of Regulatory Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Forward contract; Economics; Incentive; Microeconomics; Market power; Forward market; Electricity; Electricity market; Industrial organization; Public finance; Monetary economics; Business; Financial economics; Macroeconomics","score_opus":0.009595190925939242,"score_gpt":0.1827651827767421,"score_spread":0.17316999185080287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2461023523","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5473495,0.0013260411,0.28294843,0.008101653,0.000591143,0.00037722473,0.00031680707,0.0004798329,0.15850933],"genre_scores_gemma":[0.9726274,0.00020999694,0.006780074,0.00016409352,0.00019108225,0.00005277402,0.000033027467,0.000022906102,0.019918645],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99774134,0.0012892971,0.00007777281,0.00020390016,0.0002843661,0.00040334364],"domain_scores_gemma":[0.9873976,0.008735756,0.001698307,0.0010165494,0.0005682083,0.0005836987],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004114382,0.0006514101,0.0016066654,0.00067451247,0.0011762198,0.0031363366,0.0014927719,0.0035287833,0.015863039],"category_scores_gemma":[0.018566426,0.00091070274,0.00089199527,0.00083796744,0.0026250454,0.006087615,0.002757806,0.0022911613,0.00074680534],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005439416,0.00031359418,0.0016473838,0.00011565679,0.000059274967,0.0009828276,0.00020011161,0.09212857,0.0010356744,0.8815672,0.005786353,0.015619466],"study_design_scores_gemma":[0.00042547926,0.0001954268,0.00091780594,0.000031454525,0.00006985124,0.00033528573,0.00024302337,0.41530037,0.0010152111,0.5781,0.0033202365,0.000045891982],"about_ca_topic_score_codex":0.0018412314,"about_ca_topic_score_gemma":0.002013561,"teacher_disagreement_score":0.015863039,"about_ca_system_score_codex":0.0011391791,"about_ca_system_score_gemma":0.0016994121,"threshold_uncertainty_score":0.053067148},"labels":[],"label_agreement":null},{"id":"W2469738517","doi":"10.1002/wene.220","title":"Hydro power flexibility for power systems with variable renewable energy sources: an IEA Task 25 collaboration","year":2016,"lang":"en","type":"article","venue":"Wiley Interdisciplinary Reviews Energy and Environment","topic":"Electric Power System Optimization","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Renewable energy; Variable renewable energy; Wind power; Electric power system; Variable (mathematics); Pumped-storage hydroelectricity; Flexibility (engineering); Inflow; Electricity generation; Grid; Solar power; Environmental science; Computer science; Energy storage; Power (physics); Distributed generation; Engineering; Meteorology; Electrical engineering; Economics","score_opus":0.00850343474755512,"score_gpt":0.21370510767597067,"score_spread":0.20520167292841557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2469738517","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019169018,0.08155405,0.40886927,0.08825688,0.011547383,0.001165973,0.005509815,0.0034193299,0.38050836],"genre_scores_gemma":[0.20619628,0.10880316,0.2927247,0.006698468,0.0087734405,0.0015661356,0.01940723,0.0041253148,0.35170525],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99758244,0.0006359754,0.00013844697,0.00023864432,0.0009997796,0.00040471263],"domain_scores_gemma":[0.9905764,0.0019148571,0.00034332645,0.0012373639,0.0042971177,0.0016309964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01641862,0.0015371427,0.001091661,0.0015929283,0.00074816303,0.0042172275,0.0021138226,0.0035128735,0.016367175],"category_scores_gemma":[0.0072198124,0.00068247656,0.0012282815,0.0016787067,0.00070928567,0.0041893814,0.004299243,0.0030877066,0.007812732],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022221236,0.0002908948,0.0011526291,0.000833631,0.0000822842,0.00042324883,0.00042379854,0.060214702,0.0041109333,0.1288792,0.43040124,0.3729652],"study_design_scores_gemma":[0.0000490505,0.00010398023,0.0007856617,0.0012662113,0.000026530854,0.00021259517,0.00021651923,0.031170081,0.0018020071,0.041525807,0.9227879,0.000053711945],"about_ca_topic_score_codex":0.005349915,"about_ca_topic_score_gemma":0.0035936725,"teacher_disagreement_score":0.01641862,"about_ca_system_score_codex":0.0020861567,"about_ca_system_score_gemma":0.008912904,"threshold_uncertainty_score":0.08683103},"labels":[],"label_agreement":null},{"id":"W2475297401","doi":"10.1007/978-3-319-30235-5_11","title":"Economic Load Dispatch Using Hybrid MpBBO-SQP Algorithm","year":2016,"lang":"en","type":"book-chapter","venue":"Studies in computational intelligence","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Sequential quadratic programming; Mathematical optimization; Computer science; Simulated annealing; Population; Algorithm; Economic dispatch; Power (physics); Mathematics; Electric power system; Quadratic programming","score_opus":0.044463108533586204,"score_gpt":0.3011247273872216,"score_spread":0.2566616188536354,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2475297401","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014415359,0.00039628666,0.9628859,0.0002466805,0.0001475153,0.00007162591,0.00008968006,0.00043432895,0.02131276],"genre_scores_gemma":[0.6687839,0.00041805606,0.31299222,0.00012929966,0.000110476,0.0002912215,0.00025055546,0.00024877992,0.0167755],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997613,0.00007280572,0.000010679342,0.00002717097,0.00009972681,0.000028278408],"domain_scores_gemma":[0.9998229,0.00007630503,0.000015527754,0.000015780255,0.000055595785,0.00001405108],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045000337,0.0006825666,0.0010876894,0.0003952823,0.00049420923,0.0011247161,0.0010249765,0.0009005719,0.005111944],"category_scores_gemma":[0.00076354475,0.0004345033,0.00047510964,0.0008673837,0.00034541273,0.0007258062,0.00066067,0.0009212045,0.0010195524],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055274944,0.00004612127,0.00012375978,0.00006244493,0.000025563104,0.00003754939,0.00001905055,0.92728585,0.0009342426,0.009851616,0.0023716416,0.059186857],"study_design_scores_gemma":[0.000009033994,0.000008649069,0.00003272587,0.0000029940825,0.0000024759588,0.000005898918,0.0000026449814,0.9967242,0.0001449101,0.0025512995,0.0005130069,0.0000020694793],"about_ca_topic_score_codex":0.004020935,"about_ca_topic_score_gemma":0.0052621122,"teacher_disagreement_score":0.005111944,"about_ca_system_score_codex":0.0005898738,"about_ca_system_score_gemma":0.00077525614,"threshold_uncertainty_score":0.017101109},"labels":[],"label_agreement":null},{"id":"W2484703896","doi":"10.1109/tpwrs.2016.2597338","title":"A Robust Linear Approach for Offering Strategy of a Hybrid Electric Energy Company","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Bidding; Bilevel optimization; Mathematical optimization; Maximization; Duality (order theory); Computer science; Electricity market; Linear programming; Strong duality; Robust optimization; Energy management; Electricity; Energy (signal processing); Optimization problem; Economics; Engineering; Mathematics; Microeconomics","score_opus":0.019455812730681202,"score_gpt":0.19889421368284552,"score_spread":0.17943840095216432,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2484703896","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009140682,0.00014611226,0.9835022,0.00016714145,0.000020967462,0.000038511113,0.000056027886,0.00012930628,0.006799003],"genre_scores_gemma":[0.86845684,0.00038351116,0.11769856,0.00016968323,0.000070843926,0.0002501717,0.00017536916,0.00011986497,0.012675135],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994586,0.00018573257,0.00001832884,0.00011551782,0.0001362491,0.00008550941],"domain_scores_gemma":[0.9993807,0.0003299329,0.00011002227,0.000019197603,0.0001276311,0.000032482592],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011536276,0.0011565181,0.0010109729,0.00070815976,0.00042394336,0.0018261316,0.0011031505,0.0010060918,0.0054191044],"category_scores_gemma":[0.001656869,0.0007666328,0.00088145584,0.0005421173,0.0007508959,0.0011718587,0.0010141236,0.0012796731,0.0004983081],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022356988,0.000017432607,0.00015066011,0.000050769027,0.000020454778,0.00005316516,0.000029164712,0.97971845,0.0008411313,0.01120004,0.0003527413,0.0075435457],"study_design_scores_gemma":[0.0000021080384,0.000010956419,0.000023786011,0.0000016755776,0.0000034255434,0.000004730258,0.0000053237663,0.9983506,0.00008215135,0.0013840257,0.00012821078,0.0000029720054],"about_ca_topic_score_codex":0.008654523,"about_ca_topic_score_gemma":0.0058965283,"teacher_disagreement_score":0.008654523,"about_ca_system_score_codex":0.0017117001,"about_ca_system_score_gemma":0.001447322,"threshold_uncertainty_score":0.018128693},"labels":[],"label_agreement":null},{"id":"W2495613095","doi":"10.1017/cbo9780511613807.025","title":"Institutional or structural: lessons from international electricity sector reforms","year":2002,"lang":"en","type":"book-chapter","venue":"Cambridge University Press eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":42,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Restructuring; Private sector; Business; Dominance (genetics); Electricity; China; Investment (military); State owned; Mains electricity; Economic policy; Developing country; Market economy; Economic growth; Economics; Finance; Power (physics); Politics; Political science; Engineering","score_opus":0.02220294041908264,"score_gpt":0.194187162662625,"score_spread":0.17198422224354237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2495613095","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024146052,0.006204761,0.0058609066,0.02692843,0.00024239073,0.00003366772,0.00008293343,0.000057339195,0.93644357],"genre_scores_gemma":[0.92336595,0.009265272,0.0017633118,0.0041218004,0.00040237198,0.00007068013,0.00013777737,0.00008682834,0.06078607],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993339,0.00022822397,0.000020810381,0.000076198856,0.0001529353,0.00018780102],"domain_scores_gemma":[0.9990393,0.00039764866,0.0001353906,0.00016646119,0.00015381788,0.00010738383],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001311546,0.00023210187,0.00022830872,0.0008041108,0.001479337,0.004870079,0.0010236246,0.00131754,0.010361055],"category_scores_gemma":[0.0035173015,0.00016567916,0.00028531603,0.0019846116,0.007251417,0.005236484,0.0023730644,0.0030546857,0.0006549197],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000064261208,0.000017874543,0.00016052883,0.000025194096,0.0000020506586,0.000032409396,0.00038279468,0.00089043565,0.0000225897,0.98454314,0.0028671622,0.011049412],"study_design_scores_gemma":[0.000029868062,0.0000208562,0.0021543966,0.00020707172,0.000007398266,0.000065545166,0.0017475269,0.0011677677,0.00024070569,0.81050575,0.18384267,0.000010449159],"about_ca_topic_score_codex":0.006582303,"about_ca_topic_score_gemma":0.0076948274,"teacher_disagreement_score":0.010361055,"about_ca_system_score_codex":0.0063744853,"about_ca_system_score_gemma":0.0029989078,"threshold_uncertainty_score":0.046250284},"labels":[],"label_agreement":null},{"id":"W2499015274","doi":"10.1109/tste.2016.2598265","title":"Estimating the Price Impact of Proposed Wind Farms in Competitive Electricity Markets","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Electricity; Wind power; Electricity market; Electricity price; Electricity retailing; Electricity generation; Grid; Electricity price forecasting; Stand-alone power system; Environmental economics; Offshore wind power; Renewable energy; Business; Environmental science; Natural resource economics; Economics; Econometrics; Engineering; Distributed generation; Power (physics); Electrical engineering; Mathematics","score_opus":0.0037995282291013537,"score_gpt":0.20542203338581502,"score_spread":0.20162250515671368,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2499015274","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9435395,0.000093814495,0.053806018,0.00011311689,0.000015096902,0.00007751763,0.000228417,0.000054521588,0.002072021],"genre_scores_gemma":[0.9907032,0.000048044345,0.008727042,0.000009849953,0.000004580409,0.000019461939,0.00012762606,0.0000058553605,0.00035426408],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995253,0.00017686459,0.000022916884,0.00007002135,0.00013129228,0.00007364935],"domain_scores_gemma":[0.9960765,0.0030720297,0.00036800792,0.000100171004,0.00028549458,0.00009777909],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001756972,0.0006804208,0.0006439967,0.0005646212,0.0003028755,0.001336877,0.0011816989,0.0012969811,0.0010682375],"category_scores_gemma":[0.0083000995,0.00075781305,0.00043620088,0.0007245916,0.0006037177,0.001915179,0.0006400851,0.0010448089,0.00009888938],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005536104,0.000040441828,0.0036086475,0.000014889214,0.000015816147,0.00006927519,0.000008336271,0.9917359,0.00045959975,0.0015786008,0.00006587378,0.0023472412],"study_design_scores_gemma":[0.000003639265,0.000019925285,0.00083809305,6.8980256e-7,0.0000026503374,0.0000064493834,0.000009447966,0.99842644,0.0001867041,0.00048226828,0.000020390622,0.0000031792254],"about_ca_topic_score_codex":0.015503212,"about_ca_topic_score_gemma":0.017844675,"teacher_disagreement_score":0.015503212,"about_ca_system_score_codex":0.0015629736,"about_ca_system_score_gemma":0.0010571198,"threshold_uncertainty_score":0.030825913},"labels":[],"label_agreement":null},{"id":"W2499636022","doi":"","title":"Modelling Dependence of Extreme Price Observations in Connected Electricity Markets Using Tail Copulas","year":2012,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Tail dependence; Econometrics; Electricity; Economics; Extreme value theory; Electricity market; Tail risk; Financial economics; Mathematics; Physics; Statistics; Multivariate statistics","score_opus":0.035872564855718846,"score_gpt":0.2244999905660235,"score_spread":0.18862742571030464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2499636022","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6275258,0.00037737243,0.3679897,0.000742842,0.0000844077,0.00007443514,0.00049539685,0.00036914495,0.0023409328],"genre_scores_gemma":[0.99276793,0.0002039173,0.0047077048,0.00005817687,0.00005686943,0.000029813125,0.00033100054,0.00008920253,0.0017552687],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986205,0.00056173763,0.0000838357,0.0003374959,0.00017441595,0.00022200728],"domain_scores_gemma":[0.95727617,0.035416715,0.003933234,0.0014494488,0.0011284153,0.00079601747],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006475191,0.0012444621,0.0016737338,0.0012154886,0.0005291021,0.002393435,0.00284096,0.0028236236,0.002889276],"category_scores_gemma":[0.042368334,0.0025597007,0.00183503,0.0014743824,0.0020251859,0.0049077524,0.0021682624,0.0045610275,0.00039656577],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013704145,0.000085832304,0.0070795594,0.000045198023,0.00011464074,0.00041826602,0.00012240672,0.96924835,0.0006163963,0.01883238,0.0004965701,0.0028033236],"study_design_scores_gemma":[0.0000062475096,0.000010175643,0.00087258674,0.000003916753,0.000008286359,0.000016046135,0.000010479586,0.99388605,0.000084399086,0.005061806,0.000032065425,0.0000078974945],"about_ca_topic_score_codex":0.008699542,"about_ca_topic_score_gemma":0.0068998476,"teacher_disagreement_score":0.008699542,"about_ca_system_score_codex":0.001062648,"about_ca_system_score_gemma":0.0006649538,"threshold_uncertainty_score":0.034244537},"labels":[],"label_agreement":null},{"id":"W2502931572","doi":"10.2172/1251315","title":"Integrating Renewable Generation into Grid Operations: Four International Experiences","year":2016,"lang":"en","type":"report","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Pacific Northwest National Laboratory; U.S. Department of Energy; European Commission; Department for Enterprise, Trade and Investment, UK Government; Argonne National Laboratory; Ministry of Economy, Trade and Industry; National Renewable Energy Laboratory; National Nuclear Security Administration; Queen's University; Commonwealth Scientific and Industrial Research Organisation; Heinrich Böll Stiftung; Department of Energy and Climate Change","keywords":"Restructuring; Resource (disambiguation); Renewable energy; Liberalization; Energy mix; Business; Electricity generation; Grid; Energy planning; Environmental economics; Electricity; Economics; Power (physics); Engineering; Geography; Market economy; Computer science; Finance","score_opus":0.028425735877644548,"score_gpt":0.26645156059268377,"score_spread":0.23802582471503922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2502931572","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7760443,0.0057084095,0.003558761,0.010971754,0.00036437745,0.000069780355,0.0001043724,0.000064134285,0.20311414],"genre_scores_gemma":[0.971292,0.009459559,0.0016358912,0.0013475815,0.00008429166,0.000034979013,0.00009255174,0.000054246244,0.015998928],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.997855,0.0012841034,0.00007767404,0.000085366344,0.00023332598,0.00046457982],"domain_scores_gemma":[0.99870205,0.0005638771,0.000100469726,0.00013882287,0.00019408757,0.00030071937],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037137026,0.00042848304,0.00030316698,0.00056747656,0.0038014667,0.0054722168,0.00082156353,0.0014706125,0.001980497],"category_scores_gemma":[0.0030802067,0.00029802238,0.00035702324,0.0026484746,0.0028102254,0.0047336477,0.0046042763,0.0026017323,0.00030894126],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042615895,0.0011305142,0.018626152,0.00097734,0.00009367498,0.012313961,0.5301048,0.007386073,0.0034573073,0.11292491,0.032834437,0.27972472],"study_design_scores_gemma":[0.000049010298,0.000460906,0.008982394,0.00055427186,0.00004283863,0.0018420089,0.45351326,0.0012012111,0.0018212999,0.008593548,0.5228551,0.00008413537],"about_ca_topic_score_codex":0.00732919,"about_ca_topic_score_gemma":0.016119428,"teacher_disagreement_score":0.00732919,"about_ca_system_score_codex":0.0024878026,"about_ca_system_score_gemma":0.0019683675,"threshold_uncertainty_score":0.019640148},"labels":[],"label_agreement":null},{"id":"W2515536272","doi":"10.5547/01956574.38.3.tjam","title":"A Quarter Century Effort Yet to Come of Age: A Survey of Electricity Sector Reform in Developing Countries","year":2016,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":95,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Equity (law); Economics; Developing country; Poverty; Business; Economic reform; Public economics; Energy poverty; Quarter (Canadian coin); Economic policy; Economic growth; Development economics; Political science; Politics","score_opus":0.00918684849521107,"score_gpt":0.2072214291472784,"score_spread":0.19803458065206733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2515536272","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81249166,0.12837005,0.0010954293,0.030272156,0.00018764853,0.00008525368,0.00408085,0.000044234595,0.023372708],"genre_scores_gemma":[0.8922595,0.09930872,0.00069810945,0.0030924594,0.00012573131,0.000041918414,0.002113624,0.000014789721,0.0023451596],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9986413,0.0004462795,0.00023990677,0.00011374079,0.0003392054,0.00021966784],"domain_scores_gemma":[0.99470925,0.0014549675,0.0020277682,0.00020565829,0.0012229071,0.00037937312],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023816219,0.00015281438,0.00029995505,0.0033420462,0.0005921594,0.002029284,0.00027212064,0.0005215965,0.0028399415],"category_scores_gemma":[0.0071598995,0.00017058384,0.0002698674,0.009206877,0.00082456385,0.0032862148,0.0010830521,0.0006141745,0.0003895721],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015408536,0.00012627468,0.65510464,0.0019704849,0.000090914524,0.00025126906,0.011962314,0.000618299,0.00085086434,0.012926097,0.01757489,0.2983699],"study_design_scores_gemma":[0.000004369129,0.00008435836,0.8692256,0.0008200572,0.00002450837,0.00027709178,0.017524293,0.00013301996,0.00024406318,0.000642,0.11100418,0.000016520433],"about_ca_topic_score_codex":0.007197126,"about_ca_topic_score_gemma":0.008921181,"teacher_disagreement_score":0.007197126,"about_ca_system_score_codex":0.0014407686,"about_ca_system_score_gemma":0.0022668906,"threshold_uncertainty_score":0.01431042},"labels":[],"label_agreement":null},{"id":"W2516610861","doi":"10.21511/ee.07(2).2016.1","title":"Business implications of the falling cost of electricity","year":2016,"lang":"en","type":"article","venue":"Environmental Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator","funders":"","keywords":"Electricity; Publication; Falling (accident); Cost of electricity by source; Mains electricity; Economics; Environmental economics; Electricity generation; Natural resource economics; Business; Engineering; Electrical engineering; Advertising; Power (physics); Physics","score_opus":0.004573434315301821,"score_gpt":0.15061438595762516,"score_spread":0.14604095164232334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2516610861","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11053695,0.0130806565,0.021739904,0.35732475,0.0030677824,0.00003820215,0.0005394595,0.00013820507,0.49353415],"genre_scores_gemma":[0.96659166,0.0056824717,0.0018356692,0.009692085,0.0011181418,0.000025982332,0.00009998303,0.000069542664,0.014884421],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985366,0.00049314153,0.000030486097,0.00018144242,0.0005430002,0.00021533488],"domain_scores_gemma":[0.99444383,0.0031865488,0.00040537366,0.00027269268,0.0012277743,0.0004637292],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017464318,0.0003317385,0.00028185316,0.0009143017,0.0017645833,0.0052198335,0.00073775713,0.0034536514,0.011646867],"category_scores_gemma":[0.013360289,0.00022441208,0.00029675954,0.0014669088,0.00392829,0.0044608074,0.0012727015,0.0045692767,0.0012870854],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014068172,0.00005602842,0.0017060828,0.00006563893,0.000013951339,0.00054989656,0.00021433445,0.008555353,0.00068068464,0.92671037,0.026784055,0.034522895],"study_design_scores_gemma":[0.000038703052,0.00007463709,0.0045194416,0.00015731089,0.000016607539,0.00038006337,0.0017440699,0.013262808,0.0008261987,0.80828124,0.17065525,0.000043624164],"about_ca_topic_score_codex":0.0066838413,"about_ca_topic_score_gemma":0.00391002,"teacher_disagreement_score":0.011646867,"about_ca_system_score_codex":0.0033669884,"about_ca_system_score_gemma":0.0018204646,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W2517073011","doi":"10.1146/annurev-resource-091115-022544","title":"The Economics of Wind Power","year":2016,"lang":"en","type":"article","venue":"Annual Review of Resource Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"University of Victoria","keywords":"Wind power; Electricity; Stand-alone power system; Environmental economics; Electricity retailing; Dispatchable generation; Electricity market; Electricity generation; Natural resource economics; Economics; Cost of electricity by source; Investment (military); Electricity pricing; Incentive; Business; Renewable energy; Environmental science; Distributed generation; Microeconomics; Power (physics); Engineering; Electrical engineering","score_opus":0.0033098429136225595,"score_gpt":0.1849108076288594,"score_spread":0.18160096471523685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2517073011","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043523077,0.14964063,0.087550096,0.023530653,0.0013888766,0.000118294156,0.00075354974,0.00010170671,0.6933932],"genre_scores_gemma":[0.7929532,0.13464902,0.0070609315,0.0018578981,0.0011836626,0.00014255171,0.00026661262,0.000065784836,0.061820332],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99950004,0.00020742574,0.000016408952,0.000046980636,0.00018323054,0.00004585296],"domain_scores_gemma":[0.9994167,0.00036114577,0.000071842755,0.000043250166,0.00007586516,0.000031215506],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071125984,0.00044488857,0.0004149618,0.0005505203,0.00046659488,0.002355233,0.0005091106,0.0013675191,0.006533871],"category_scores_gemma":[0.0022731277,0.00031967196,0.0002895501,0.0009186293,0.0015252242,0.0025453847,0.00072650757,0.0012958687,0.0007139457],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003336087,0.000027060654,0.00089587935,0.00025453823,0.000047928366,0.00017458457,0.000056001347,0.031524293,0.00047971055,0.9065833,0.0067414795,0.053181916],"study_design_scores_gemma":[0.000025665904,0.00006830216,0.0035870494,0.0006751082,0.000025233749,0.0003882789,0.00028454972,0.010978858,0.00032499168,0.782115,0.20149545,0.000031425327],"about_ca_topic_score_codex":0.0019893886,"about_ca_topic_score_gemma":0.0021570453,"teacher_disagreement_score":0.006533871,"about_ca_system_score_codex":0.0013392939,"about_ca_system_score_gemma":0.0009543629,"threshold_uncertainty_score":0.021857917},"labels":[],"label_agreement":null},{"id":"W2523886588","doi":"10.1109/tii.2016.2614659","title":"Auxiliary Hybrid PSO-BPNN-Based Transmission System Loss Estimation in Generation Scheduling","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Particle swarm optimization; Estimator; Electric power system; Scheduling (production processes); Artificial neural network; Computer science; Backpropagation; Electric power transmission; AC power; Power transmission; Transmission loss; Mathematical optimization; Real-time computing; Engineering; Power (physics); Algorithm; Artificial intelligence; Statistics; Mathematics; Telecommunications","score_opus":0.02342507939400623,"score_gpt":0.21897970247809695,"score_spread":0.19555462308409072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2523886588","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07600754,0.00026793501,0.91973835,0.0001253331,0.000044889654,0.000043352273,0.00005338404,0.0007630895,0.0029561399],"genre_scores_gemma":[0.96500444,0.00011587408,0.033079464,0.00003138508,0.00001801462,0.000047453465,0.000066811,0.000036384183,0.0016000662],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969447,0.00009802892,0.00001786929,0.000052494426,0.00010841959,0.000028698865],"domain_scores_gemma":[0.9995751,0.00017536362,0.000060436432,0.00004128192,0.00013079218,0.00001705745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006846149,0.00049041683,0.0005930159,0.00031755902,0.00018173354,0.0006492111,0.0006983116,0.00039660055,0.000713092],"category_scores_gemma":[0.001452053,0.00028920083,0.00027994235,0.00035097456,0.00023175005,0.00077167037,0.00037217388,0.000514871,0.0001597621],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000800983,0.00006807216,0.0009971441,0.000036375746,0.000032297394,0.00003335913,0.000020755926,0.9516692,0.0016366253,0.00080404285,0.00045440556,0.044167623],"study_design_scores_gemma":[0.0000016919702,0.000006676751,0.00013780055,7.5089673e-7,0.0000019950812,0.0000026715193,6.964889e-7,0.99957925,0.00015376428,0.00007672484,0.000037208687,7.501058e-7],"about_ca_topic_score_codex":0.0072231353,"about_ca_topic_score_gemma":0.006062203,"teacher_disagreement_score":0.0072231353,"about_ca_system_score_codex":0.00044551026,"about_ca_system_score_gemma":0.0004591995,"threshold_uncertainty_score":0.014362156},"labels":[],"label_agreement":null},{"id":"W2524178484","doi":"","title":"Analisis comparativo de diferentes esquemas de suficiencia en generacion electrica: Algunas reflexiones para el mercado electrico en Colombia","year":2016,"lang":"es","type":"preprint","venue":"El Repositorio Institucional de la Universidad EAFIT (Universidad EAFIT)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Philosophy","score_opus":0.007783343600616901,"score_gpt":0.26341787422291457,"score_spread":0.2556345306222977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2524178484","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9345485,0.0044967947,0.0061576073,0.0014226955,0.00006386305,0.000076841156,0.0033331644,0.00025747708,0.049643133],"genre_scores_gemma":[0.99282986,0.00083009026,0.00137429,0.000047064717,0.000008378147,0.000020765401,0.0008121327,0.000042314052,0.004035212],"study_design_codex":"observational","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9991374,0.00017503275,0.000048879232,0.00018345672,0.00032429828,0.00013090894],"domain_scores_gemma":[0.99660575,0.0009184134,0.0005159433,0.00018822536,0.0015752997,0.00019633377],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085622614,0.00041088596,0.00039053982,0.0015655921,0.0006311899,0.0024980272,0.0005695506,0.00037261817,0.0045211096],"category_scores_gemma":[0.005480028,0.00014816559,0.00030415828,0.0025988421,0.00048890687,0.0011205834,0.0007536644,0.0005512591,0.00034883048],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00086170685,0.00009925892,0.74553156,0.0012165018,0.0005289539,0.00043564814,0.00696528,0.021365814,0.0045378585,0.006826977,0.01185489,0.1997756],"study_design_scores_gemma":[0.000013235018,0.00010046165,0.94941014,0.0002595791,0.00018136861,0.00008870268,0.010724032,0.008137635,0.0019295021,0.0013895694,0.027707234,0.000058559315],"about_ca_topic_score_codex":0.2544031,"about_ca_topic_score_gemma":0.4358463,"teacher_disagreement_score":0.2544031,"about_ca_system_score_codex":0.004636544,"about_ca_system_score_gemma":0.0018604712,"threshold_uncertainty_score":0.50584465},"labels":[],"label_agreement":null},{"id":"W2527920400","doi":"10.3138/9781442690127-010","title":"8. What Is the ‘Right’ Price for Electricity in Ontario?","year":2010,"lang":"en","type":"book-chapter","venue":"University of Toronto Press eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity price; Business; Economics; Engineering; Electrical engineering","score_opus":0.008988308858388819,"score_gpt":0.1700185440072686,"score_spread":0.16103023514887976,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2527920400","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018922066,0.01502709,0.0020345645,0.09033392,0.0011799347,0.000048758535,0.0016484162,0.00006204693,0.87074333],"genre_scores_gemma":[0.2519732,0.014092956,0.0023068676,0.006191301,0.00032892823,0.000036750924,0.00044950328,0.00010541007,0.7245151],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992324,0.000058495072,0.000026815294,0.000058117403,0.00036298067,0.00026123482],"domain_scores_gemma":[0.99955434,0.00006241362,0.000030857733,0.000015797305,0.00026425289,0.000072308954],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054009346,0.0003151324,0.00026078545,0.00052912754,0.0040689395,0.0034948492,0.00051845616,0.0021708494,0.025631718],"category_scores_gemma":[0.0013208531,0.00033579962,0.00033713965,0.0015558448,0.0020735215,0.0020871647,0.0004804069,0.0013882668,0.00270459],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007046772,0.000024536603,0.0050890627,0.00036298818,0.000018828463,0.0007239513,0.0052799443,0.0012932132,0.0008737389,0.44272205,0.47104692,0.07249432],"study_design_scores_gemma":[0.000012091484,0.000011388129,0.012304413,0.00024242057,0.000014297243,0.00013430715,0.003189588,0.00063276984,0.00031872754,0.03251147,0.9505812,0.00004733867],"about_ca_topic_score_codex":0.953131,"about_ca_topic_score_gemma":0.98903173,"teacher_disagreement_score":0.04686898,"about_ca_system_score_codex":0.041766915,"about_ca_system_score_gemma":0.039555512,"threshold_uncertainty_score":0.30304158},"labels":[],"label_agreement":null},{"id":"W2532155703","doi":"10.1109/ipec.2005.207046","title":"Reliability component in transmission service pricing","year":2005,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wheeling; Component (thermodynamics); Reliability (semiconductor); Reliability engineering; Transmission system; Computer science; Transmission (telecommunications); Incentive; Service (business); Investment (military); Engineering; Telecommunications; Business; Economics; Power (physics); Microeconomics","score_opus":0.005206745081986079,"score_gpt":0.19324173349792592,"score_spread":0.18803498841593985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2532155703","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004707927,0.00013951307,0.98009217,0.00032435163,0.0001577261,0.00010255116,0.00003403709,0.00046854527,0.0139732715],"genre_scores_gemma":[0.29184327,0.0005933945,0.6863646,0.0001786875,0.0005258957,0.00025296418,0.000097722455,0.0006071603,0.019536348],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99522424,0.0015672212,0.00012930845,0.00036987287,0.0025444045,0.00016502787],"domain_scores_gemma":[0.9935702,0.0031096982,0.0004411647,0.00079380267,0.0019529862,0.0001320637],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003989505,0.0009991423,0.0007749925,0.0019700674,0.000805983,0.002058202,0.0019233356,0.0010434709,0.008140102],"category_scores_gemma":[0.01878686,0.0006749256,0.0011023979,0.0018087237,0.0013223069,0.0048338124,0.0014214815,0.0030395542,0.0021002295],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009170513,0.00017557609,0.0014938306,0.00015953639,0.00006272502,0.00028326616,0.0005233278,0.18741713,0.0032642374,0.4861625,0.0057706027,0.31459555],"study_design_scores_gemma":[0.000048782273,0.00019352199,0.0009284149,0.000082232094,0.00008192885,0.00053561444,0.00010928269,0.7955371,0.0039018304,0.15691507,0.041563712,0.000102441045],"about_ca_topic_score_codex":0.004409536,"about_ca_topic_score_gemma":0.002818955,"teacher_disagreement_score":0.008140102,"about_ca_system_score_codex":0.0014501619,"about_ca_system_score_gemma":0.0015842016,"threshold_uncertainty_score":0.027231395},"labels":[],"label_agreement":null},{"id":"W2537516281","doi":"10.1287/inte.2016.0863","title":"Power System Operator in Mexico Reveals Millions in Savings by Updating Its Short-Term Thermal Unit Commitment Model","year":2016,"lang":"en","type":"article","venue":"INFORMS Journal on Applied Analytics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Alberta","keywords":"Power system simulation; Integer programming; Operations research; Operator (biology); Lagrangian relaxation; Computer science; Thermal power station; Operational planning; Process (computing); Mathematical optimization; Term (time); Economic dispatch; Electric power system; Engineering; Power (physics); Economics; Mathematics; Operating system; Waste management","score_opus":0.012622626418105801,"score_gpt":0.22828881889855795,"score_spread":0.21566619248045216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2537516281","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5525564,0.0022894228,0.22519085,0.022243092,0.00092659664,0.0002429711,0.016466146,0.0037237506,0.17636071],"genre_scores_gemma":[0.9338439,0.0007223122,0.0388271,0.00047225217,0.0000582185,0.00010487769,0.0050969487,0.00021637337,0.020658094],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999678,0.000092553535,0.000011120197,0.000062491454,0.00010594055,0.000049892282],"domain_scores_gemma":[0.9994307,0.00021390736,0.000054025943,0.000054695844,0.00021378825,0.000032892658],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007018088,0.00042973782,0.0003284211,0.00028326883,0.00061973266,0.0011168038,0.0007906932,0.0005941041,0.004762628],"category_scores_gemma":[0.0017548918,0.00030049658,0.0003510055,0.0007442396,0.00026122716,0.0009901098,0.00040740918,0.0012998718,0.0003652913],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028768138,0.00009295768,0.011638209,0.00012657407,0.00011440349,0.00018747941,0.00014443527,0.80768746,0.001221866,0.03300192,0.05394299,0.09155407],"study_design_scores_gemma":[0.00007731101,0.00011652492,0.00943572,0.00005447576,0.000068119385,0.000070929076,0.00023281468,0.92901164,0.0016395313,0.0061086784,0.05313972,0.00004453396],"about_ca_topic_score_codex":0.16183786,"about_ca_topic_score_gemma":0.2097379,"teacher_disagreement_score":0.16183786,"about_ca_system_score_codex":0.0032479514,"about_ca_system_score_gemma":0.0023611719,"threshold_uncertainty_score":0.32179177},"labels":[],"label_agreement":null},{"id":"W2540358859","doi":"10.1109/icpst.2008.4745162","title":"Pros and Cons of Existing Frequency Regulation Mechanism in Indian Power Industry","year":2008,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canada Excellence Research Chairs, Government of Canada","keywords":"Reliability (semiconductor); Supply and demand; Mechanism (biology); cons; Electric power system; Automatic frequency control; Electricity; Electric power industry; Frequency regulation; Mains electricity; Computer science; Power (physics); Business; Industrial organization; Risk analysis (engineering); Reliability engineering; Telecommunications; Engineering; Economics; Electrical engineering; Microeconomics","score_opus":0.018237858400203696,"score_gpt":0.21424539958991737,"score_spread":0.19600754118971367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2540358859","genre_codex":"empirical","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77740073,0.0065131653,0.058815166,0.0044972464,0.00024957565,0.000111204674,0.00034050216,0.0007590337,0.1513134],"genre_scores_gemma":[0.9960303,0.00039044305,0.0020066188,0.00016539653,0.00004126381,0.000012475781,0.000035950456,0.000013151503,0.001304354],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9943878,0.0013195367,0.00032851475,0.0007463542,0.0024556858,0.0007620691],"domain_scores_gemma":[0.99387383,0.0020609954,0.0016563393,0.0009730404,0.001202893,0.0002328494],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004861921,0.00025767062,0.0004061129,0.0018898697,0.0008970453,0.0035358274,0.0024193078,0.0010194426,0.0023111887],"category_scores_gemma":[0.005491418,0.00026051162,0.0006567445,0.0016844638,0.0017877427,0.0013784249,0.0010130893,0.0009070366,0.00035153277],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0023370958,0.0007287437,0.13180818,0.00071183854,0.00032256977,0.0015116113,0.001493267,0.080723576,0.019176014,0.3675207,0.0052785682,0.38838783],"study_design_scores_gemma":[0.0005039906,0.0030355896,0.5064815,0.00096788764,0.0013014766,0.004567308,0.0059052394,0.24673615,0.03131806,0.11461234,0.08382385,0.0007465979],"about_ca_topic_score_codex":0.00650971,"about_ca_topic_score_gemma":0.006978498,"teacher_disagreement_score":0.00650971,"about_ca_system_score_codex":0.0017614496,"about_ca_system_score_gemma":0.0020458573,"threshold_uncertainty_score":0.02571261},"labels":[],"label_agreement":null},{"id":"W2540360429","doi":"10.1109/sae.2009.5534850","title":"On gaming in electricity markets under cap-and-trade","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Electricity; Electricity market; Industrial organization; Business; Microeconomics; Economics; Environmental economics; Engineering; Electrical engineering","score_opus":0.003852852135180528,"score_gpt":0.18769062988110966,"score_spread":0.18383777774592913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2540360429","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9094111,0.0013373194,0.019145709,0.0020381343,0.0001400572,0.00008759082,0.00011060001,0.000054455977,0.06767511],"genre_scores_gemma":[0.99732625,0.0004253073,0.0005521223,0.00011414374,0.00004318284,0.000010102015,0.000010527118,0.000005059254,0.0015133384],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988201,0.0007028813,0.000024467521,0.000070654365,0.00009282134,0.00028900546],"domain_scores_gemma":[0.99311537,0.0055040135,0.00062866556,0.00012825505,0.00029526142,0.00032847974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001814291,0.00081804383,0.0009795388,0.00041052751,0.0010860545,0.0024978777,0.00077714643,0.0013608964,0.0066795372],"category_scores_gemma":[0.006767895,0.00024219959,0.0007356191,0.00047349065,0.0027370187,0.0024249144,0.0012326614,0.0016288311,0.0002155232],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011853768,0.00044868723,0.009787621,0.00017825399,0.00014550498,0.0011849925,0.0003128264,0.7748228,0.003629881,0.18534091,0.002590106,0.020373026],"study_design_scores_gemma":[0.00023612636,0.0008318103,0.009420649,0.000067159956,0.00014426463,0.00021679705,0.0012715255,0.805325,0.0017133851,0.17797133,0.002692789,0.0001091745],"about_ca_topic_score_codex":0.013107892,"about_ca_topic_score_gemma":0.012197109,"teacher_disagreement_score":0.013107892,"about_ca_system_score_codex":0.0015608788,"about_ca_system_score_gemma":0.0009943444,"threshold_uncertainty_score":0.026063204},"labels":[],"label_agreement":null},{"id":"W2540882355","doi":"10.1109/sae.2009.5534871","title":"Effects of wind power on day-ahead reserve schedule","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Power system simulation; Schedule; Electric power system; Penetration (warfare); Reserve requirement; Computer science; Wind speed; Benchmark (surveying); Environmental science; Simulation; Power (physics); Meteorology; Operations research; Economics; Engineering; Electrical engineering; Monetary economics; Geography; Central bank; Physics","score_opus":0.0034778068442386026,"score_gpt":0.19636894083131037,"score_spread":0.19289113398707178,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2540882355","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99024665,0.00013177819,0.004679554,0.00016989016,0.0000404815,0.000027843313,0.0003288743,0.00009492151,0.0042799846],"genre_scores_gemma":[0.9991393,0.000038615286,0.0004402478,0.000019277719,0.0000024319204,0.000005383763,0.000067742985,0.000018248713,0.00026880324],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996524,0.00015825401,0.00001674603,0.000040531133,0.00004985576,0.0000821832],"domain_scores_gemma":[0.9962161,0.002909159,0.00031074812,0.00014783928,0.00022765106,0.00018845184],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010034431,0.00056188216,0.0006055722,0.00030800843,0.0003695785,0.0009979536,0.00043738025,0.0008539464,0.002318576],"category_scores_gemma":[0.0056917327,0.00033304468,0.00040731637,0.00033669127,0.0005273857,0.0007690822,0.00034715977,0.0008740345,0.00023765839],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002442859,0.00005455504,0.0030413985,0.00003122956,0.000039906205,0.00022794504,0.00003102038,0.99050105,0.00235528,0.00085489464,0.00029014488,0.0023282245],"study_design_scores_gemma":[0.000089375506,0.00059669826,0.010187885,0.000014712102,0.000060562794,0.00009344685,0.00014637962,0.9836992,0.0031029836,0.0013933284,0.0005755729,0.000039770966],"about_ca_topic_score_codex":0.0056693573,"about_ca_topic_score_gemma":0.006056101,"teacher_disagreement_score":0.0056693573,"about_ca_system_score_codex":0.0006502278,"about_ca_system_score_gemma":0.000478024,"threshold_uncertainty_score":0.011272728},"labels":[],"label_agreement":null},{"id":"W2542023874","doi":"10.1109/tdc-la.2010.5762873","title":"The impact of wind power variability and curtailment on ramping requirements","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Residual; Reliability engineering; Base load power plant; Grid; Computer science; Load management; Electric power system; Power grid; Service (business); Power demand; Automotive engineering; Peak demand; Demand response; Power (physics); Engineering; Electricity; Electrical engineering; Power consumption; Business","score_opus":0.006302993472803593,"score_gpt":0.2457508884602599,"score_spread":0.2394478949874563,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2542023874","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9545992,0.00040613714,0.025681993,0.00041665082,0.00005699236,0.000029503477,0.00038377155,0.00009540493,0.018330332],"genre_scores_gemma":[0.99926776,0.000055180688,0.00035066938,0.000011380556,0.0000060297866,0.0000026780756,0.000030952495,0.000010149083,0.00026519335],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951506,0.00016269203,0.000020184198,0.00005364394,0.0001244766,0.00012399143],"domain_scores_gemma":[0.996114,0.0029880237,0.00038948475,0.00016510549,0.0002331567,0.00011023724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009811424,0.00035000656,0.00040032418,0.0002055777,0.00021618303,0.00094681856,0.0004067685,0.00056140893,0.0015422564],"category_scores_gemma":[0.005696093,0.00019567394,0.00035540847,0.0003640073,0.00032664748,0.00082679995,0.00037906462,0.0008027759,0.0001359903],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003398196,0.00006667455,0.007818698,0.000065549335,0.00004273337,0.00072383304,0.000030597646,0.9694415,0.0072579,0.0040507633,0.0004676358,0.009694228],"study_design_scores_gemma":[0.000023869434,0.00032573185,0.037734322,0.00001265692,0.00004059708,0.00026560674,0.00010319991,0.9544143,0.003876077,0.0025620365,0.0006106075,0.000030877763],"about_ca_topic_score_codex":0.0031744023,"about_ca_topic_score_gemma":0.002362137,"teacher_disagreement_score":0.0031744023,"about_ca_system_score_codex":0.00038036323,"about_ca_system_score_gemma":0.0003511014,"threshold_uncertainty_score":0.006311834},"labels":[],"label_agreement":null},{"id":"W2545155455","doi":"10.1109/epc.2007.4520372","title":"A Comprehensive Short-Term Operations Framework for a Disco in Competitive Electricity Markets","year":2007,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Scheduling (production processes); Operations research; Grid; Electricity; Computer science; Term (time); Operations management; Engineering","score_opus":0.012563631358904058,"score_gpt":0.26458801005218846,"score_spread":0.2520243786932844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2545155455","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02704238,0.00052597304,0.9340468,0.0008055199,0.000046486657,0.0001982904,0.00088702014,0.00025098503,0.036196567],"genre_scores_gemma":[0.840152,0.0013473604,0.13523026,0.00017454416,0.00009670152,0.0006597623,0.0009323912,0.00016939775,0.021237476],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99933654,0.0002033518,0.000029956596,0.00011097655,0.00019972083,0.000119496806],"domain_scores_gemma":[0.9996086,0.00016261773,0.00006148984,0.000022213295,0.00008442637,0.000060796177],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001236177,0.0014287117,0.0010655223,0.00077035703,0.00095022965,0.0036491514,0.0021910842,0.0016755284,0.0071788733],"category_scores_gemma":[0.0011514856,0.00075663364,0.00095502834,0.0011754306,0.0010882652,0.0028696845,0.0013789093,0.0016758412,0.0009096551],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000146035645,0.000016209195,0.00013201348,0.000022807717,0.0000070703677,0.000068562505,0.00003753678,0.9560687,0.00014734331,0.04026586,0.0005346482,0.0026846572],"study_design_scores_gemma":[0.000009694776,0.0000235139,0.00008139655,0.000008416617,0.000005649781,0.000024473798,0.000037453217,0.98302644,0.00005805776,0.015189007,0.001527265,0.000008697638],"about_ca_topic_score_codex":0.021526534,"about_ca_topic_score_gemma":0.015827844,"teacher_disagreement_score":0.021526534,"about_ca_system_score_codex":0.0026185103,"about_ca_system_score_gemma":0.003551888,"threshold_uncertainty_score":0.042802513},"labels":[],"label_agreement":null},{"id":"W2545357316","doi":"10.1109/nssmic.2004.1466909","title":"Electric utility deregulation: failure or success","year":2005,"lang":"en","type":"article","venue":"IEEE Symposium Conference Record Nuclear Science 2004.","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Deregulation; Restructuring; Revenue; Electric power industry; Electric utility; Electricity market; Blackout; Commission; Business; Electric power; Order (exchange); Electricity; Economics; Industrial organization; Market economy; Finance; Electric power system; Power (physics); Engineering","score_opus":0.011698687575825055,"score_gpt":0.22390245553913982,"score_spread":0.21220376796331475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2545357316","genre_codex":"empirical","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47754723,0.019804811,0.0065461937,0.053883854,0.0012213093,0.00022059855,0.0015854993,0.00041435307,0.43877614],"genre_scores_gemma":[0.97290874,0.00584323,0.000630621,0.0018913288,0.0003543468,0.00003111988,0.00037761373,0.000064456304,0.017898595],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99505854,0.0010875828,0.00031126622,0.00035052534,0.0018757548,0.0013164184],"domain_scores_gemma":[0.9873403,0.0030343817,0.0026184649,0.0006838032,0.004497419,0.0018256399],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007170507,0.0005020727,0.0004274786,0.0019404441,0.0010394264,0.0062424364,0.0008339591,0.0017419974,0.00738043],"category_scores_gemma":[0.016469913,0.00019065221,0.0002949096,0.0035241386,0.002565158,0.006212257,0.0023480519,0.001530321,0.0028116007],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031395713,0.00034644455,0.143334,0.00093610096,0.00011419344,0.0025507198,0.007321481,0.003298521,0.0010514642,0.15749258,0.11620974,0.5670308],"study_design_scores_gemma":[0.000062816245,0.0009928311,0.15095839,0.0027964178,0.00011288672,0.0042146337,0.049453344,0.0053633903,0.0041799415,0.046517223,0.7351231,0.00022510084],"about_ca_topic_score_codex":0.0039732964,"about_ca_topic_score_gemma":0.0053362027,"teacher_disagreement_score":0.00738043,"about_ca_system_score_codex":0.0025213212,"about_ca_system_score_gemma":0.0023815178,"threshold_uncertainty_score":0.037921727},"labels":[],"label_agreement":null},{"id":"W2547848394","doi":"10.1109/asscc.2012.6523255","title":"Triangular approximate distribution model of wind electric generators","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Unavailability; Wind power; Renewable energy; Cumulative distribution function; Electric power system; Probability density function; Electricity; Electricity generation; Computer science; Probability distribution; Power (physics); Wind speed; Stochastic modelling; Mathematical optimization; Reliability engineering; Engineering; Meteorology; Electrical engineering; Mathematics; Statistics; Physics","score_opus":0.008962909200484724,"score_gpt":0.187485015080024,"score_spread":0.17852210587953926,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2547848394","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035845023,0.0006316489,0.93691707,0.0004321088,0.000104828396,0.00004486455,0.00047857434,0.00018340268,0.025362512],"genre_scores_gemma":[0.95824873,0.00072177046,0.020748299,0.0001143226,0.00007075398,0.00009144666,0.00036924187,0.000062666084,0.01957288],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969196,0.00009063422,0.000013005051,0.00007073722,0.00008371414,0.000050009356],"domain_scores_gemma":[0.99944633,0.0002599201,0.00008406843,0.00004038559,0.00013470763,0.000034488257],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043663854,0.0005373314,0.00065104204,0.0003952557,0.00033562392,0.0010519755,0.0013063673,0.000996331,0.004713678],"category_scores_gemma":[0.0018111703,0.0002644473,0.0005550576,0.000864794,0.00057762826,0.0010535627,0.00043152887,0.0007243007,0.00061097275],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002199017,0.00000934814,0.00035323412,0.000023884542,0.000009815414,0.00009095214,0.00003009007,0.9594578,0.0005886141,0.034134217,0.00074217794,0.004537745],"study_design_scores_gemma":[0.0000013110306,0.0000037048803,0.00004178705,0.0000011516282,0.0000013510047,0.000010340545,0.0000039473844,0.9966714,0.000031487067,0.003037233,0.00019442895,0.0000019181641],"about_ca_topic_score_codex":0.011403691,"about_ca_topic_score_gemma":0.006072869,"teacher_disagreement_score":0.011403691,"about_ca_system_score_codex":0.0007633988,"about_ca_system_score_gemma":0.00049217296,"threshold_uncertainty_score":0.02267462},"labels":[],"label_agreement":null},{"id":"W2548383892","doi":"","title":"Solar Power Generation and Risk Transfer Systems","year":2015,"lang":"en","type":"article","venue":"International Journal of Business","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity generation; Renewable energy; Tariff; Grid parity; Electricity; Solar power; Electric power system; Feed-in tariff; Environmental economics; Stand-alone power system; Distributed generation; Environmental science; Economics; Power (physics); Energy policy; Engineering; Electrical engineering; International economics; Physics","score_opus":0.013391551092007806,"score_gpt":0.20488265235149342,"score_spread":0.1914911012594856,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2548383892","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6172327,0.0053024665,0.24818625,0.008051278,0.00035602963,0.0001505976,0.0013189822,0.00026694636,0.11913478],"genre_scores_gemma":[0.9954378,0.00047654813,0.00095470186,0.000058730035,0.00004542748,0.000012517339,0.0000623471,0.000006562092,0.0029453156],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99928063,0.00027778762,0.00002958457,0.00013872575,0.00014984618,0.00012342854],"domain_scores_gemma":[0.9974336,0.0015672365,0.0005627939,0.00011969337,0.00019925518,0.00011744637],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009936695,0.0004083229,0.00041578859,0.0005937882,0.0003744874,0.0019731084,0.000806424,0.001298162,0.008432196],"category_scores_gemma":[0.0042740847,0.00023995941,0.0005461635,0.00093402364,0.001036373,0.0019043302,0.000896788,0.0013603942,0.00033423112],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000088788634,0.000078381185,0.0081064515,0.00011978816,0.0000763935,0.0005155482,0.00011884417,0.5515437,0.0007914188,0.41626033,0.003208771,0.019091556],"study_design_scores_gemma":[0.000046161626,0.00010074437,0.0061689755,0.000051777515,0.000037284666,0.00030247174,0.00025246912,0.6574408,0.00043444335,0.32742235,0.007702022,0.000040529787],"about_ca_topic_score_codex":0.0036819917,"about_ca_topic_score_gemma":0.0017801506,"teacher_disagreement_score":0.008432196,"about_ca_system_score_codex":0.0018279274,"about_ca_system_score_gemma":0.0005464642,"threshold_uncertainty_score":0.028208554},"labels":[],"label_agreement":null},{"id":"W2548767124","doi":"","title":"Impact of solar production on Czech electricity grid system imbalance","year":2016,"lang":"en","type":"preprint","venue":"LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Grantová Agentura České Republiky; European Commission; McGill University","keywords":"Photovoltaics; Czech; Electricity; Volatility (finance); Photovoltaic system; Electricity generation; Stand-alone power system; Economics; Grid parity; Grid; Production (economics); Natural resource economics; Business; Econometrics; Macroeconomics; Engineering; Power (physics); Geography; Electrical engineering; Physics","score_opus":0.013408411472989448,"score_gpt":0.23323160058608566,"score_spread":0.21982318911309623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2548767124","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98954225,0.0005480974,0.0023436313,0.00047106927,0.00003582066,0.000018919558,0.00044314735,0.000060669914,0.006536449],"genre_scores_gemma":[0.9995591,0.00006749069,0.00008660053,0.000010172812,0.000003402474,0.0000021903215,0.000048519134,0.000005029303,0.00021740704],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99950385,0.00014338545,0.000026902993,0.00007891372,0.00007737654,0.00016963307],"domain_scores_gemma":[0.99913484,0.0003519618,0.00025736255,0.000057365294,0.00009885761,0.00009966337],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085582724,0.0004172181,0.0006337956,0.0006446329,0.0004006292,0.002056297,0.00041798525,0.00060439506,0.0025171656],"category_scores_gemma":[0.0032129285,0.00020261608,0.00077281985,0.0007869712,0.000557891,0.00082879514,0.001061537,0.00069914927,0.0001233066],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00058884156,0.00011287765,0.06627289,0.000229109,0.00026842684,0.0011240906,0.00007651733,0.9004012,0.006791423,0.01580553,0.0013540541,0.006975103],"study_design_scores_gemma":[0.00033058753,0.00040575085,0.15548043,0.00007037829,0.00037615554,0.00026063636,0.0005881681,0.82018983,0.006402061,0.013311126,0.0024653077,0.00011957317],"about_ca_topic_score_codex":0.02062204,"about_ca_topic_score_gemma":0.009572432,"teacher_disagreement_score":0.02062204,"about_ca_system_score_codex":0.0011455411,"about_ca_system_score_gemma":0.0010342825,"threshold_uncertainty_score":0.041004002},"labels":[],"label_agreement":null},{"id":"W2551089671","doi":"","title":"Short-term unit commitment and loading problem","year":2014,"lang":"fr","type":"article","venue":"Constellation (Université du Québec à Chicoutimi)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Fonds de recherche du Québec – Nature et technologies; Natural Sciences and Engineering Research Council of Canada","keywords":"Time horizon; Mathematical optimization; Power system simulation; Term (time); Integer programming; Integer (computer science); Power (physics); Linear programming; Hydropower; Power station; Mathematics; Computer science; Control theory (sociology); Engineering; Electric power system","score_opus":0.009096676134648743,"score_gpt":0.1793492412427916,"score_spread":0.17025256510814288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2551089671","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0129317995,0.00030601685,0.9705476,0.00047243226,0.00014194848,0.00015111445,0.0003185278,0.00034817416,0.0147822965],"genre_scores_gemma":[0.5247485,0.0005856931,0.4401602,0.00031228925,0.00021591557,0.0008504678,0.0012561526,0.0004891025,0.031381592],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982343,0.00076271046,0.000067973226,0.0002555065,0.00052863813,0.00015088805],"domain_scores_gemma":[0.9983889,0.0009885287,0.00012341842,0.00015910249,0.00023112811,0.00010893486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00184664,0.0010013764,0.0013872974,0.00050685304,0.00071707106,0.0014449918,0.0023862466,0.0016088133,0.010893039],"category_scores_gemma":[0.0034079445,0.00067884685,0.00071669224,0.0008655665,0.0007008013,0.0017622145,0.001006881,0.002309397,0.0015170894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000070172675,0.000055200475,0.00023072981,0.00007979599,0.000038466416,0.00012677554,0.000043838787,0.94149095,0.0009582388,0.016809413,0.0038801401,0.036216278],"study_design_scores_gemma":[0.000014444555,0.000024228726,0.00007318968,0.000008621808,0.000005544342,0.000041602594,0.0000135952705,0.99060035,0.00045740302,0.006473718,0.0022778676,0.0000094571915],"about_ca_topic_score_codex":0.004534379,"about_ca_topic_score_gemma":0.00427289,"teacher_disagreement_score":0.010893039,"about_ca_system_score_codex":0.0009359296,"about_ca_system_score_gemma":0.0014691938,"threshold_uncertainty_score":0.03644085},"labels":[],"label_agreement":null},{"id":"W2553557427","doi":"10.1049/cp.2016.0476","title":"Economic viability of price arbitrage operation of vanadium redox battey in Alberta's energy market","year":2016,"lang":"en","type":"article","venue":"12th IET International Conference on AC and DC Power Transmission (ACDC 2016)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Vanadium; Arbitrage; Redox; Energy (signal processing); Business; Economics; Materials science; Finance; Metallurgy; Mathematics","score_opus":0.006065989505328032,"score_gpt":0.21219052636276767,"score_spread":0.20612453685743964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2553557427","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9894716,0.00009754436,0.002310223,0.00026085987,0.0000079949505,0.000019034575,0.00011096401,0.000035343124,0.0076862457],"genre_scores_gemma":[0.99869066,0.000026335547,0.00047816214,0.00000869816,0.0000013564157,0.000003122615,0.00004116021,0.0000028615375,0.0007477043],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996481,0.0001234544,0.000008621494,0.000033447945,0.00007881379,0.00010762864],"domain_scores_gemma":[0.9988361,0.00075356226,0.00012135254,0.000035460114,0.00015521715,0.00009824167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014635323,0.00040701168,0.00044531072,0.00045958222,0.00062232243,0.001868832,0.00090780784,0.00072208623,0.0018904526],"category_scores_gemma":[0.0030237897,0.00031464727,0.00042477142,0.00037301762,0.0009139895,0.0011421117,0.00056917156,0.0007714461,0.00007031801],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045035433,0.000057407284,0.0067542912,0.000024802903,0.00002439095,0.00026047675,0.000033386714,0.98001647,0.0014367905,0.0075771115,0.0003472005,0.0030173792],"study_design_scores_gemma":[0.000039524104,0.00017942935,0.0037982785,0.000006219055,0.000024322477,0.000022979684,0.000114659466,0.99246746,0.0011628602,0.0018104957,0.00035407665,0.000019648913],"about_ca_topic_score_codex":0.17556913,"about_ca_topic_score_gemma":0.1990817,"teacher_disagreement_score":0.8244309,"about_ca_system_score_codex":0.0059086457,"about_ca_system_score_gemma":0.0036995676,"threshold_uncertainty_score":0.3490944},"labels":[],"label_agreement":null},{"id":"W2556166935","doi":"10.1109/naps.2016.7747984","title":"Security constrained transmission expansion planning by accelerated benders decomposition","year":2016,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Precondition; Decomposition; Computer science; Benders' decomposition; Mathematical optimization; Reduction (mathematics); Acceleration; Transmission (telecommunications); Stochastic programming; Mathematics; Telecommunications","score_opus":0.009437011524755458,"score_gpt":0.23550878184199942,"score_spread":0.22607177031724396,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2556166935","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024060607,0.00018094119,0.96850497,0.00016710181,0.000035912646,0.00006181105,0.00012951352,0.0003139084,0.0065452214],"genre_scores_gemma":[0.5737123,0.00034780861,0.41801324,0.000103145656,0.000053871685,0.00027284274,0.0004417564,0.0001930248,0.006862063],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971,0.000119109165,0.000008710511,0.000038479444,0.000076084165,0.000047633006],"domain_scores_gemma":[0.9997173,0.0001601792,0.000034654036,0.00002195396,0.000042346754,0.000023507067],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068618386,0.0011490356,0.00088087184,0.00046041384,0.00026863418,0.0006403359,0.00053984305,0.000643512,0.0040361853],"category_scores_gemma":[0.0011175728,0.000491776,0.00071628595,0.00057691825,0.00053998275,0.0006888207,0.00073083414,0.0013504673,0.00040632585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027961647,0.0000108189415,0.00007930512,0.00001750703,0.0000075111334,0.00002334412,0.000010314472,0.9849807,0.00064351386,0.006048633,0.0003908309,0.0077596465],"study_design_scores_gemma":[0.000007394157,0.0000149326615,0.00002418029,0.0000023662822,0.0000020522866,0.0000039020583,0.0000033884892,0.99626464,0.00016667113,0.003203179,0.00030544127,0.0000017387508],"about_ca_topic_score_codex":0.006078467,"about_ca_topic_score_gemma":0.00599323,"teacher_disagreement_score":0.006078467,"about_ca_system_score_codex":0.000538706,"about_ca_system_score_gemma":0.0012241226,"threshold_uncertainty_score":0.013502419},"labels":[],"label_agreement":null},{"id":"W2557243083","doi":"","title":"Québec's Cost-Effective Electrical Efficiency Potential: Results of a Utility-Stakeholders Working Group Process","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Stakeholder; Transparency (behavior); Openness to experience; Process (computing); Business; Portfolio; Environmental economics; Public economics; Economics; Political science; Public relations; Finance; Computer science; Psychology","score_opus":0.012698644580522837,"score_gpt":0.21564503614212024,"score_spread":0.2029463915615974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2557243083","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.815267,0.00070638786,0.0061409837,0.0073874258,0.000087919056,0.0027891141,0.004513496,0.00020678317,0.16290085],"genre_scores_gemma":[0.96112525,0.0003969459,0.0085832365,0.00082083215,0.000021322545,0.0005720447,0.0018261758,0.00008106995,0.026573198],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.98879236,0.0037320738,0.0002829261,0.00070456346,0.005477293,0.0010107547],"domain_scores_gemma":[0.94800544,0.022432137,0.0009123723,0.0017949971,0.02550174,0.0013533413],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.023206104,0.00048483035,0.00038674191,0.0020670344,0.005943153,0.004447731,0.0014398771,0.0012439052,0.0060121953],"category_scores_gemma":[0.033104822,0.00028413412,0.0005484008,0.0036811398,0.0016038219,0.0013919517,0.002105006,0.0013365791,0.00039784674],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015264831,0.002998879,0.14024074,0.0019215451,0.0002983886,0.0022628503,0.1396086,0.035121705,0.014013389,0.036368035,0.1070727,0.5185667],"study_design_scores_gemma":[0.00063821836,0.0020388514,0.41518423,0.0007787893,0.0002629315,0.00019942262,0.2223392,0.025355913,0.012651164,0.0054607783,0.31460348,0.0004870393],"about_ca_topic_score_codex":0.9208606,"about_ca_topic_score_gemma":0.9304973,"teacher_disagreement_score":0.07913941,"about_ca_system_score_codex":0.0576206,"about_ca_system_score_gemma":0.0640003,"threshold_uncertainty_score":0.41806865},"labels":[],"label_agreement":null},{"id":"W2559760681","doi":"10.1109/epec.2016.7771711","title":"Estimated economic load dispatch based on real operation logbook","year":2016,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Logbook; Computer science; Economic dispatch; Electric power system; Task (project management); Constraint (computer-aided design); Software; Power (physics); Energy management; Constrained optimization problem; Energy management system; Mathematical optimization; Reliability engineering; Optimization problem; Energy (signal processing); Engineering; Algorithm","score_opus":0.007299896394019185,"score_gpt":0.20637091212929967,"score_spread":0.1990710157352805,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2559760681","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32094783,0.00048088375,0.6409443,0.0001750551,0.0001865333,0.00029899727,0.008198301,0.0058496487,0.022918463],"genre_scores_gemma":[0.9013364,0.00018915182,0.088565834,0.0000132154,0.000042933,0.00013078943,0.004571672,0.00015012853,0.004999865],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996946,0.00005473017,0.000028866225,0.00007853713,0.0001260439,0.000017293467],"domain_scores_gemma":[0.99933547,0.00024178046,0.000121603254,0.000090071546,0.00018616665,0.000024839293],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003654578,0.0007860291,0.0005271037,0.0016350852,0.00016698634,0.0006827703,0.00048119723,0.00021048551,0.0050198776],"category_scores_gemma":[0.0019416044,0.0002025,0.00019202344,0.0010529682,0.000117243224,0.0008859214,0.00020321527,0.00043028506,0.0012166783],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005675871,0.00016765158,0.009188849,0.00026533913,0.000060513175,0.00021854986,0.000066243425,0.76941264,0.0068087494,0.0024462198,0.007565021,0.20323265],"study_design_scores_gemma":[0.000016567355,0.000034222416,0.005951762,0.000009910024,0.000008391507,0.000028203744,0.0000177834,0.9892223,0.0024120274,0.00085256965,0.0014246517,0.000021723694],"about_ca_topic_score_codex":0.002502832,"about_ca_topic_score_gemma":0.0027613766,"teacher_disagreement_score":0.0050198776,"about_ca_system_score_codex":0.00037188642,"about_ca_system_score_gemma":0.00035433617,"threshold_uncertainty_score":0.016793132},"labels":[],"label_agreement":null},{"id":"W2565521228","doi":"","title":"On the performance of updating Stochastic Dynamic Programming policy using Ensemble Streamflow Prediction in a snow-covered region","year":2014,"lang":"en","type":"article","venue":"2014 AGU Fall Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Streamflow; Snow; Computer science; Environmental science; Meteorology; Geography; Cartography; Drainage basin","score_opus":0.006817334310415236,"score_gpt":0.2067643694880938,"score_spread":0.19994703517767856,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2565521228","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9778692,0.00038105357,0.019686485,0.00035798087,0.00008082255,0.00001818347,0.00010757995,0.00014727325,0.001351386],"genre_scores_gemma":[0.9975096,0.000060735325,0.002096813,0.000024779303,0.000013000121,0.0000049931623,0.00008529726,0.000009869486,0.00019491359],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994586,0.0001991121,0.000034941244,0.00010950669,0.00007760886,0.00012032659],"domain_scores_gemma":[0.99168044,0.006684385,0.000348496,0.00029660334,0.00073451316,0.00025553888],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028135385,0.0007347304,0.0010265078,0.0004690335,0.0005372277,0.00088270224,0.00083755434,0.0014693877,0.0006682781],"category_scores_gemma":[0.011569781,0.00039572737,0.0003880504,0.0004486589,0.0006265631,0.0012466931,0.00079188275,0.0011042826,0.00009162925],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025383077,0.00007463672,0.002740161,0.0000144474925,0.000028911756,0.000025545845,0.0000151950435,0.9904579,0.00041205343,0.00030111347,0.00022135547,0.0054547153],"study_design_scores_gemma":[0.0000051261613,0.000018576715,0.000413278,0.0000012473083,0.000004783715,0.0000017291713,0.000005362916,0.9993154,0.00015191015,0.00007003268,0.000010857932,0.0000017547327],"about_ca_topic_score_codex":0.04384408,"about_ca_topic_score_gemma":0.017882045,"teacher_disagreement_score":0.04384408,"about_ca_system_score_codex":0.00086931855,"about_ca_system_score_gemma":0.0016016802,"threshold_uncertainty_score":0.08717775},"labels":[],"label_agreement":null},{"id":"W2567338541","doi":"","title":"Three Essays in Energy Economics and Industrial Organization, with Applications to Electricity and Distribution Networks","year":2014,"lang":"en","type":"dissertation","venue":"TSpace (University of Toronto)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electric power distribution; Electricity; Energy economics; Distribution (mathematics); Economics; Industrial organization; Environmental economics; Engineering; Neoclassical economics; Electrical engineering; Microeconomics; Mathematics","score_opus":0.004002623652388378,"score_gpt":0.16608536133231386,"score_spread":0.16208273767992548,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2567338541","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010126808,0.27064222,0.032422025,0.16764237,0.032877922,0.00013595494,0.0013403428,0.00027925766,0.4845331],"genre_scores_gemma":[0.15849629,0.3045014,0.017637484,0.021052318,0.043983664,0.0004983637,0.0014237342,0.00042509413,0.45198166],"study_design_codex":"not_applicable","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99891543,0.0002923146,0.00006933697,0.00016425471,0.00044846733,0.000110217676],"domain_scores_gemma":[0.9972372,0.001583558,0.00026514454,0.00019018278,0.0004578514,0.00026612802],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017257697,0.0012278125,0.00059188466,0.0023562931,0.002297281,0.003718384,0.0009112835,0.0018093255,0.016093954],"category_scores_gemma":[0.0048703235,0.00033278443,0.0007833007,0.004925438,0.0045347344,0.002909398,0.0014861886,0.0025714159,0.0038885137],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028267612,0.000051070812,0.0015444673,0.0003783846,0.000027291902,0.000092045106,0.0014748897,0.001269321,0.00027093996,0.37934902,0.53017914,0.085335165],"study_design_scores_gemma":[0.000004811174,0.000014990874,0.0021380594,0.00033324983,0.00000706704,0.000054098724,0.00054660474,0.00032443702,0.00006060746,0.06689892,0.9296067,0.000010554933],"about_ca_topic_score_codex":0.0072341203,"about_ca_topic_score_gemma":0.011787232,"teacher_disagreement_score":0.016093954,"about_ca_system_score_codex":0.004128297,"about_ca_system_score_gemma":0.0029857317,"threshold_uncertainty_score":0.053839564},"labels":[],"label_agreement":null},{"id":"W2578461454","doi":"10.1016/j.epsr.2017.01.011","title":"Multi-period stochastic security-constrained OPF considering the uncertainty sources of wind power, load demand and equipment unavailability","year":2017,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":67,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Unavailability; Sensitivity (control systems); Electric power system; Computer science; Mathematical optimization; Reliability engineering; Wind power; Power flow; Transmission line; Power (physics); Control theory (sociology); Engineering; Mathematics","score_opus":0.028908790720970842,"score_gpt":0.29736249722318037,"score_spread":0.2684537065022095,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2578461454","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12783718,0.001018717,0.8605938,0.0009825518,0.00021231429,0.000067904,0.0007328187,0.00023911375,0.008315588],"genre_scores_gemma":[0.987258,0.00032896103,0.008683603,0.000050546536,0.0000526657,0.00005865743,0.00020140462,0.00004362677,0.0033225664],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993304,0.00019534482,0.000029743933,0.00014229743,0.00012880462,0.00017339103],"domain_scores_gemma":[0.9980217,0.0011790184,0.0003949963,0.00007117046,0.00024879837,0.00008430706],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016591406,0.0014990182,0.0020884045,0.0006545637,0.00052305777,0.0017256135,0.0011612412,0.0018363328,0.002722655],"category_scores_gemma":[0.0034978199,0.001150705,0.001229759,0.0011163688,0.0009777886,0.0014141768,0.0010628591,0.0017264163,0.00018400831],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017335511,0.0000040448845,0.00009237449,0.000017577717,0.000018570905,0.00004698437,0.0000052291,0.9973246,0.0000875882,0.0015854798,0.000102888276,0.00069728564],"study_design_scores_gemma":[0.0000044149438,0.0000060001157,0.00010592573,0.000003208184,0.000007855872,0.000007081579,0.0000039868883,0.9988463,0.000034557175,0.00092993415,0.000047418518,0.0000031710672],"about_ca_topic_score_codex":0.016873524,"about_ca_topic_score_gemma":0.010258827,"teacher_disagreement_score":0.016873524,"about_ca_system_score_codex":0.0012152172,"about_ca_system_score_gemma":0.0015977512,"threshold_uncertainty_score":0.03355062},"labels":[],"label_agreement":null},{"id":"W2581295120","doi":"10.1049/iet-gtd.2016.0923","title":"Multi‐group particle swarm optimisation for transmission expansion planning solution based on LU decomposition","year":2017,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Particle swarm optimization; Decomposition; Group (periodic table); Mathematical optimization; Transmission (telecommunications); Computer science; Decomposition method (queueing theory); Mathematics; Physics; Chemistry; Telecommunications; Statistics; Quantum mechanics","score_opus":0.030106996117003647,"score_gpt":0.2837620201590405,"score_spread":0.2536550240420369,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2581295120","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029615413,0.00034112702,0.96202624,0.00017613621,0.00005101618,0.000063739164,0.00006005594,0.0003687566,0.007297437],"genre_scores_gemma":[0.59334135,0.00038479714,0.4011182,0.000059352686,0.00003791644,0.00028351264,0.00023015686,0.00011398645,0.004430819],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998294,0.000073716736,0.0000070821297,0.0000207245,0.000045234796,0.000023737159],"domain_scores_gemma":[0.9997656,0.00013760061,0.000023698523,0.000015549345,0.000042603595,0.0000150302485],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052182673,0.00070805824,0.00065634213,0.00044621434,0.0003066904,0.0006740344,0.0004210819,0.0005330817,0.0019617782],"category_scores_gemma":[0.0010441671,0.00026886427,0.0005049502,0.00048520602,0.0003305842,0.00037430107,0.0005114409,0.0006509989,0.00026523587],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003126703,0.000018286106,0.00023225816,0.000052479205,0.00001226116,0.00003115155,0.000029633651,0.9779009,0.0011093646,0.0037986692,0.00065506867,0.01612858],"study_design_scores_gemma":[0.0000030799217,0.0000088573215,0.000030177982,0.000002190878,0.0000014314636,0.0000025660827,0.0000040309515,0.9990495,0.00018593349,0.0005166179,0.00019462041,0.0000010659711],"about_ca_topic_score_codex":0.0043721623,"about_ca_topic_score_gemma":0.0031436426,"teacher_disagreement_score":0.0043721623,"about_ca_system_score_codex":0.00038668184,"about_ca_system_score_gemma":0.000842107,"threshold_uncertainty_score":0.008693397},"labels":[],"label_agreement":null},{"id":"W2587544603","doi":"10.1109/tpwrs.2017.2665695","title":"A Fast Solution Method for Stochastic Transmission Expansion Planning","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Linearization; Reduction (mathematics); Stochastic programming; Computer science; Nonlinear system; Model order reduction; Benders' decomposition; Mathematics; Algorithm","score_opus":0.01999731207967152,"score_gpt":0.2772400854513618,"score_spread":0.25724277337169027,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2587544603","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008760336,0.00012746773,0.9974744,0.000073681964,0.000047760805,0.000024403882,0.000042362746,0.00014874032,0.0011851187],"genre_scores_gemma":[0.09804053,0.0007484279,0.8943806,0.00012528282,0.00011836983,0.0004714261,0.00039565808,0.0002244117,0.005495251],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99962866,0.0001210984,0.0000200226,0.000056663357,0.00014085651,0.0000326293],"domain_scores_gemma":[0.9994143,0.0003302582,0.00004194755,0.000029260269,0.00016192987,0.000022290162],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00096520444,0.0010453311,0.00085909583,0.0008005217,0.00060174934,0.0006361269,0.00077483227,0.0008406838,0.0065284194],"category_scores_gemma":[0.0018998391,0.00051949127,0.0011120982,0.0010984658,0.00045232795,0.0008057549,0.00087646674,0.0017429321,0.0010406729],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003317033,0.000022204356,0.00021300201,0.00014695688,0.000031535288,0.00006764991,0.000042778716,0.85912347,0.0021153286,0.036246117,0.0039474135,0.09801032],"study_design_scores_gemma":[0.000008487914,0.000009455173,0.00003029247,0.000008155029,0.0000034757843,0.00001525722,0.000004639807,0.9923394,0.0002613815,0.004963274,0.0023519152,0.000004282694],"about_ca_topic_score_codex":0.0060179885,"about_ca_topic_score_gemma":0.00559521,"teacher_disagreement_score":0.0065284194,"about_ca_system_score_codex":0.00061321026,"about_ca_system_score_gemma":0.0020003943,"threshold_uncertainty_score":0.021839678},"labels":[],"label_agreement":null},{"id":"W2589134274","doi":"10.20381/ruor-238","title":"Demand Response in the Ontario Electricity Market","year":2016,"lang":"en","type":"article","venue":"uO Research (University of Ottawa)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Demand response; Electricity market; Electricity; Business; Economics; Industrial organization; Engineering; Electrical engineering","score_opus":0.019698661007203414,"score_gpt":0.23089709722162213,"score_spread":0.21119843621441872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2589134274","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87615246,0.000741838,0.006624373,0.004869333,0.000071870105,0.00011400249,0.0029976985,0.000109683875,0.1083188],"genre_scores_gemma":[0.9853119,0.00023420788,0.00049336394,0.00007877691,0.000010899881,0.000019234729,0.00030400083,0.00001230783,0.013535304],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99966884,0.00008817561,0.0000075342273,0.000039991108,0.00006610532,0.00012933688],"domain_scores_gemma":[0.9994879,0.00018879704,0.00007480564,0.000015431275,0.0001396361,0.0000934574],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004616129,0.00037607763,0.00046038907,0.0002856598,0.00093068,0.0017077178,0.0011202898,0.0013738654,0.007089531],"category_scores_gemma":[0.001710716,0.00033964776,0.0006134836,0.00046788366,0.00089263346,0.0011625992,0.0005660979,0.0006693176,0.0003151357],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041483704,0.00013257597,0.014099361,0.000102320715,0.000052640564,0.0006630442,0.00039493846,0.90867966,0.0015827443,0.056884214,0.011437137,0.005556424],"study_design_scores_gemma":[0.00016801534,0.00008606774,0.013254065,0.000018594596,0.000030197698,0.0000792742,0.00075756165,0.96818805,0.00025798037,0.006748037,0.010359588,0.000052568023],"about_ca_topic_score_codex":0.8385172,"about_ca_topic_score_gemma":0.8432714,"teacher_disagreement_score":0.16148281,"about_ca_system_score_codex":0.01598164,"about_ca_system_score_gemma":0.006147166,"threshold_uncertainty_score":0.3248676},"labels":[],"label_agreement":null},{"id":"W2599098979","doi":"10.1016/j.ejor.2018.11.032","title":"Sustainable transmission planning in imperfectly competitive electricity industries: Balancing economic and environmental outcomes","year":2018,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"HEC Montréal; Aalto-Yliopisto; McGill University; National Science Foundation","keywords":"Economics; Oligopoly; Cournot competition; Microeconomics; Electricity; Incentive; Electricity market; Environmental economics; Variable cost; Industrial organization; Renewable energy; Electric power industry; Engineering","score_opus":0.017768946206609966,"score_gpt":0.2761366840218413,"score_spread":0.25836773781523137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2599098979","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7169677,0.0014579241,0.21680002,0.0063777026,0.00016034557,0.00018645167,0.0003866059,0.00015557522,0.057507686],"genre_scores_gemma":[0.99384946,0.00026301743,0.00412996,0.00004087245,0.000019425424,0.000018118597,0.000040799005,0.000014991777,0.0016235086],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99933845,0.00035025648,0.00002293912,0.000056155284,0.0001026014,0.00012960202],"domain_scores_gemma":[0.99748623,0.0016538048,0.00032584887,0.00008846394,0.00026812262,0.0001775334],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021274255,0.00061767345,0.00088028243,0.00071576366,0.00052617834,0.002629911,0.00079500536,0.0014429099,0.003631724],"category_scores_gemma":[0.006393674,0.00040247812,0.00035373963,0.0010500391,0.0009626096,0.0024807185,0.0009940767,0.0010336239,0.00018924531],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009766457,0.000060155107,0.0011726171,0.00006285897,0.00004941,0.00010696771,0.000032503805,0.9534107,0.0002926808,0.035301637,0.00067924993,0.00873354],"study_design_scores_gemma":[0.00003974895,0.00007973787,0.0011519836,0.000031316606,0.00004411471,0.00003437374,0.00020044835,0.9158836,0.000321557,0.08167192,0.00052647706,0.000014774461],"about_ca_topic_score_codex":0.00526407,"about_ca_topic_score_gemma":0.010232469,"teacher_disagreement_score":0.00526407,"about_ca_system_score_codex":0.0014192362,"about_ca_system_score_gemma":0.0020553342,"threshold_uncertainty_score":0.012149274},"labels":[],"label_agreement":null},{"id":"W2600907557","doi":"10.5547/01956574.39.6.sdeb","title":"Evaluating an Interconnection Project: Do Strategic Interactions Matter?","year":2018,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"HEC Montréal","funders":"","keywords":"Interconnection; Unbundling; Arbitrage; Industrial organization; Economics; Electricity market; Microeconomics; Imperfect competition; Hydroelectricity; Electricity; Business; Computer science; Telecommunications; Engineering; Electrical engineering; Financial economics","score_opus":0.04955678065341152,"score_gpt":0.3230700957731208,"score_spread":0.2735133151197093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2600907557","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9070199,0.0006886965,0.0224661,0.0057778936,0.000048773276,0.00018807045,0.00023766668,0.00005821358,0.063514665],"genre_scores_gemma":[0.9971136,0.00015238277,0.001692028,0.00009599814,0.0000112035095,0.000021681299,0.00004676221,0.000009957806,0.0008563944],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9940065,0.0040489375,0.00018595399,0.00043604986,0.00070557394,0.00061703805],"domain_scores_gemma":[0.9698322,0.023629906,0.002856314,0.0005484599,0.0017918835,0.0013412321],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008594167,0.00059617707,0.0009506381,0.0009678154,0.0009881859,0.0052675568,0.0008190489,0.002480288,0.009163875],"category_scores_gemma":[0.048520606,0.00041327238,0.00042077253,0.0011594048,0.0016488698,0.007055913,0.0015154638,0.0015897191,0.00044593157],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007285153,0.0006787492,0.19564362,0.00037137236,0.0007602849,0.0011562078,0.001404976,0.49731418,0.001607712,0.16870205,0.005361348,0.12627101],"study_design_scores_gemma":[0.00025084466,0.0013919086,0.07130367,0.00029642627,0.0003833349,0.0003570533,0.008121309,0.6284301,0.0018365592,0.27663252,0.010846437,0.0001497412],"about_ca_topic_score_codex":0.007761965,"about_ca_topic_score_gemma":0.017448068,"teacher_disagreement_score":0.009163875,"about_ca_system_score_codex":0.0027597018,"about_ca_system_score_gemma":0.0026353924,"threshold_uncertainty_score":0.045450866},"labels":[],"label_agreement":null},{"id":"W2603728065","doi":"10.11575/prism/30162","title":"A Review of Alberta's Default Rate for Electricity","year":2016,"lang":"en","type":"review","venue":"Open MIND","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Economics; Environmental science; Natural resource economics; Engineering; Electrical engineering","score_opus":0.03886046301839999,"score_gpt":0.33186060466113426,"score_spread":0.29300014164273425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2603728065","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00013239293,0.99708885,0.0001051965,0.00039725195,0.00015236053,0.0000034882655,0.000036611156,0.0000044646663,0.002079387],"genre_scores_gemma":[0.0012168357,0.9971718,0.00019472852,0.00024572483,0.00016061496,0.0000040017326,0.000051726467,0.0000025592383,0.00095194986],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99947864,0.000067213754,0.00006992499,0.00007657948,0.00028099853,0.000026709156],"domain_scores_gemma":[0.9985258,0.0007497117,0.00019610982,0.000041715506,0.00042733666,0.000059267244],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013286878,0.0007415056,0.001035909,0.0039493064,0.00045436484,0.0012002507,0.001061449,0.001188567,0.0053171506],"category_scores_gemma":[0.002599637,0.00041653222,0.0005596213,0.0063843415,0.000648938,0.0011304246,0.00048086068,0.0011323246,0.0012074024],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044383232,0.000059426744,0.00036191443,0.030792682,0.00009594572,0.00013100523,0.00011934409,0.0010735542,0.00067379186,0.01188998,0.06826436,0.8864936],"study_design_scores_gemma":[0.000006224086,0.000054711534,0.0017493763,0.008705809,0.00008530378,0.0003212326,0.00006401118,0.00009546557,0.0002397881,0.0013822837,0.98726964,0.000026165175],"about_ca_topic_score_codex":0.027718432,"about_ca_topic_score_gemma":0.053024404,"teacher_disagreement_score":0.9722816,"about_ca_system_score_codex":0.00217218,"about_ca_system_score_gemma":0.004398705,"threshold_uncertainty_score":0.05511415},"labels":[],"label_agreement":null},{"id":"W2604030907","doi":"10.1016/j.enpol.2017.02.053","title":"The merit order effect of Czech photovoltaic plants","year":2017,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Australian National University; Grantová Agentura České Republiky; European Commission; McGill University","keywords":"Renewable energy; Photovoltaic system; Czech; Electricity; Electricity generation; Spot contract; Grid parity; Environmental economics; Economics; Feed-in tariff; Environmental science; Natural resource economics; Photovoltaics; Engineering; Power (physics); Energy policy; Electrical engineering; Physics; Financial economics","score_opus":0.0032341391160333028,"score_gpt":0.22227671609326116,"score_spread":0.21904257697722787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2604030907","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8568738,0.001622329,0.005560371,0.0042585195,0.00019862998,0.000026283786,0.00067239976,0.00009269255,0.13069497],"genre_scores_gemma":[0.9964874,0.00014399436,0.0002055251,0.000061022063,0.000016827047,0.0000033419146,0.000031566517,0.000015879772,0.003034365],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99877125,0.00037432153,0.000048483853,0.00013033264,0.00024281931,0.0004328157],"domain_scores_gemma":[0.9957973,0.002384588,0.00047801313,0.00031731467,0.0006685226,0.00035419068],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016277583,0.00025208888,0.00097587006,0.00063487864,0.0009824823,0.004614226,0.00070998294,0.0018892752,0.005911705],"category_scores_gemma":[0.009818149,0.00038014192,0.0005797161,0.0006933457,0.0010218887,0.0024077594,0.0009296679,0.0019560375,0.00030360636],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022466574,0.00027092846,0.007865663,0.0003113366,0.00018442882,0.0006271346,0.00025019894,0.273672,0.005524155,0.6813159,0.0061119488,0.021619575],"study_design_scores_gemma":[0.00062224385,0.0009819873,0.077171914,0.00020620962,0.00044566474,0.0005215571,0.0015937752,0.25763333,0.0077256667,0.6264891,0.026337342,0.00027115387],"about_ca_topic_score_codex":0.015494683,"about_ca_topic_score_gemma":0.021473993,"teacher_disagreement_score":0.015494683,"about_ca_system_score_codex":0.0039582485,"about_ca_system_score_gemma":0.0031255363,"threshold_uncertainty_score":0.030808985},"labels":[],"label_agreement":null},{"id":"W2605027696","doi":"10.1214/16-aoas1002","title":"Electricity price dependence in New York State zones: A robust detrended correlation approach","year":2017,"lang":"en","type":"article","venue":"The Annals of Applied Statistics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Econometrics; Electricity; Detrended fluctuation analysis; Grid; Estimator; Electricity price; Computer science; Economics; Statistics; Mathematics","score_opus":0.0574632283859776,"score_gpt":0.26386248696745934,"score_spread":0.20639925858148173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2605027696","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69239557,0.0008523366,0.30114907,0.00097308983,0.000082854654,0.000070838876,0.0011058134,0.00024677493,0.00312357],"genre_scores_gemma":[0.98306376,0.00024938976,0.014067891,0.000051847204,0.000054826673,0.000043537068,0.0010303042,0.000042288055,0.0013960643],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991804,0.00042948374,0.000041128464,0.00018208375,0.0001016395,0.00006537404],"domain_scores_gemma":[0.99175996,0.0058643045,0.00091775856,0.0006880751,0.0005955024,0.00017434881],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002686613,0.0004489879,0.00062607066,0.0010554494,0.0003373578,0.0011837324,0.0013403294,0.0006855129,0.0013255072],"category_scores_gemma":[0.013728826,0.00047098866,0.0007519173,0.0009972702,0.0007583509,0.0012688248,0.0009776908,0.0014092964,0.000169325],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025825747,0.00016775286,0.08888382,0.00009161066,0.00054072635,0.0007252579,0.00022242176,0.8296993,0.001291934,0.040519238,0.0028098503,0.034789898],"study_design_scores_gemma":[0.0000035765975,0.000007711304,0.0059295627,0.000005639494,0.000010760264,0.0000148055115,0.000018385139,0.99032825,0.00011103848,0.0032833933,0.00027682597,0.000010004696],"about_ca_topic_score_codex":0.028378814,"about_ca_topic_score_gemma":0.021790719,"teacher_disagreement_score":0.028378814,"about_ca_system_score_codex":0.00077629887,"about_ca_system_score_gemma":0.0006117352,"threshold_uncertainty_score":0.05642724},"labels":[],"label_agreement":null},{"id":"W2605900105","doi":"","title":"Cost of Carbon Emissions Abatement in the Ontario Electricity Market: 2006 to 2011","year":2014,"lang":"en","type":"article","venue":"Energy & the Economy,37th IAEE International Conference,June 15-18, 2014","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Natural resource economics; Electricity; Greenhouse gas; Electricity market; Environmental economics; Electricity system; Business; Economics; Electricity generation; Environmental science; Engineering; Power (physics)","score_opus":0.018641017634958443,"score_gpt":0.22678006671450246,"score_spread":0.208139049079544,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2605900105","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9367208,0.0024741667,0.00069198443,0.003363317,0.00009315039,0.000059256192,0.030368846,0.000047316247,0.026181184],"genre_scores_gemma":[0.9781295,0.0009533243,0.00027868987,0.00009707766,0.000022487855,0.000011908136,0.006054594,0.000011220721,0.014441229],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99940276,0.000043274973,0.00003395597,0.00004538774,0.000323703,0.00015094112],"domain_scores_gemma":[0.99843353,0.00022293776,0.0004144861,0.000037778653,0.0007370785,0.00015416562],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000493359,0.00018962499,0.0002490273,0.0006701573,0.0007398052,0.0013701264,0.0006050838,0.000553049,0.0021993325],"category_scores_gemma":[0.003308538,0.00027705295,0.0005772892,0.0018384798,0.00050676585,0.0007881795,0.00037928764,0.0006721923,0.00021954416],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002203742,0.00023010124,0.67551214,0.0007887224,0.0007097304,0.0015285496,0.001425242,0.12878463,0.0025354214,0.028374469,0.08915832,0.06874891],"study_design_scores_gemma":[0.00008639754,0.00010003335,0.8882443,0.00007920416,0.00019396204,0.00035954922,0.0017218922,0.053088736,0.0015016792,0.0010666277,0.05347267,0.000084850166],"about_ca_topic_score_codex":0.9671804,"about_ca_topic_score_gemma":0.9890749,"teacher_disagreement_score":0.034270283,"about_ca_system_score_codex":0.034270283,"about_ca_system_score_gemma":0.016076302,"threshold_uncertainty_score":0.24864948},"labels":[],"label_agreement":null},{"id":"W2606364002","doi":"","title":"The Effects of Market Deregulation on Electricity Rates in U.S. and Canada","year":2014,"lang":"en","type":"article","venue":"Energy & the Economy,37th IAEE International Conference,June 15-18, 2014","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Deregulation; Electricity market; Electricity; Business; Economics; Market economy; Engineering","score_opus":0.004174158694086862,"score_gpt":0.18287811897443518,"score_spread":0.17870396028034832,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2606364002","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.933772,0.002961831,0.00030563868,0.011481352,0.00016642569,0.000038699836,0.013722869,0.000103972074,0.037447244],"genre_scores_gemma":[0.9903746,0.001297312,0.000107071726,0.00038707186,0.000022615186,0.0000055867986,0.002057823,0.000021043299,0.0057267006],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9986588,0.000104134044,0.00005256171,0.00010813687,0.00048041285,0.00059595954],"domain_scores_gemma":[0.994477,0.00069325994,0.0005329204,0.000120821554,0.0034573397,0.000718834],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010738422,0.00032167503,0.00049374596,0.0011414569,0.0016186445,0.0036786853,0.00155545,0.0008616339,0.005197239],"category_scores_gemma":[0.007249808,0.0003287773,0.00080996926,0.0026151463,0.0011805019,0.00085538055,0.0010203249,0.0015364446,0.0002839616],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018928048,0.00025730892,0.66044474,0.00026609877,0.0005369236,0.001304547,0.0017756516,0.105105154,0.002576196,0.07197185,0.09485386,0.059014827],"study_design_scores_gemma":[0.00020324883,0.000121987156,0.8911216,0.00015934162,0.00033491888,0.00018423762,0.007733512,0.043986466,0.002225313,0.0039865356,0.049781486,0.0001613117],"about_ca_topic_score_codex":0.99598026,"about_ca_topic_score_gemma":0.99776185,"teacher_disagreement_score":0.062333655,"about_ca_system_score_codex":0.062333655,"about_ca_system_score_gemma":0.05830941,"threshold_uncertainty_score":0.4522645},"labels":[],"label_agreement":null},{"id":"W2606383594","doi":"10.1109/tii.2017.2695122","title":"Improved Random Drift Particle Swarm Optimization With Self-Adaptive Mechanism for Solving the Power Economic Dispatch Problem","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":119,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Particle swarm optimization; Mathematical optimization; Economic dispatch; Crossover; Benchmark (surveying); Multi-swarm optimization; Position (finance); Computer science; Metaheuristic; Imperialist competitive algorithm; Meta-optimization; Power (physics); Electric power system; Algorithm; Mathematics; Artificial intelligence","score_opus":0.01552880190210809,"score_gpt":0.2090435726441396,"score_spread":0.19351477074203152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2606383594","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012271354,0.00047161063,0.9849973,0.00009229008,0.00007499303,0.00004226206,0.000015470625,0.00019171376,0.0018429724],"genre_scores_gemma":[0.52508533,0.00079805375,0.46971965,0.0001278418,0.00011485827,0.00027272792,0.00016048051,0.000086034546,0.0036350542],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996537,0.000110090004,0.000022660734,0.00004453994,0.00014114405,0.000027925009],"domain_scores_gemma":[0.99973124,0.000116523144,0.000036770896,0.000025098827,0.0000785105,0.000011761766],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009712291,0.00072746753,0.0008982974,0.00056718267,0.00030228787,0.0005353997,0.0010289777,0.00078434416,0.0006997532],"category_scores_gemma":[0.0013918775,0.00030602742,0.00070341484,0.0006330648,0.00035265792,0.0006310065,0.00048449475,0.00074543414,0.00025212206],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042214255,0.00003506005,0.00047633197,0.00006587277,0.000058337228,0.00007536335,0.000037686685,0.9334684,0.0025217647,0.0064217728,0.0010517499,0.055745386],"study_design_scores_gemma":[0.000007799857,0.000012760102,0.00006658867,0.0000018173445,0.0000034857405,0.00000879593,0.0000015475035,0.998835,0.00022550387,0.00044508427,0.00038916,0.000002433806],"about_ca_topic_score_codex":0.0028640574,"about_ca_topic_score_gemma":0.0018214033,"teacher_disagreement_score":0.0028640574,"about_ca_system_score_codex":0.00033885665,"about_ca_system_score_gemma":0.0007413003,"threshold_uncertainty_score":0.0056948066},"labels":[],"label_agreement":null},{"id":"W2609705870","doi":"","title":"Interview with Clair Moeller","year":2015,"lang":"en","type":"article","venue":"University of Minnesota Digital Conservancy (University of Minnesota)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.014856709068646804,"score_gpt":0.15649960942847144,"score_spread":0.14164290035982463,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2609705870","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003065484,0.006511073,0.00023798985,0.94918966,0.007736055,0.00005515777,0.00024893667,0.00004860545,0.032907028],"genre_scores_gemma":[0.04507707,0.005967217,0.0005430366,0.82960546,0.0039849333,0.00018540898,0.00014522306,0.00012803919,0.114363484],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.997988,0.0006662278,0.000058142927,0.00024293638,0.00047814776,0.0005665029],"domain_scores_gemma":[0.9941255,0.0017097166,0.00020504421,0.00008120139,0.0018266871,0.0020518927],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037483182,0.0006892929,0.0007554963,0.0010212366,0.014498768,0.0041925656,0.0016127417,0.0092827715,0.033384353],"category_scores_gemma":[0.012180998,0.0006928008,0.0005187733,0.0012549274,0.0019913674,0.003911222,0.0021151125,0.018147627,0.007036477],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012206976,0.000019525862,0.00027034737,0.000024614243,0.0000017901907,0.0001775836,0.0014571752,0.000034772544,0.00005169116,0.0010823212,0.99294335,0.0039245943],"study_design_scores_gemma":[0.000009849277,0.000020783618,0.0011242807,0.00017763894,0.0000031101558,0.00035868655,0.015905226,0.00010469269,0.00006422609,0.000741899,0.9814517,0.000037986312],"about_ca_topic_score_codex":0.12650415,"about_ca_topic_score_gemma":0.18505068,"teacher_disagreement_score":0.12650415,"about_ca_system_score_codex":0.007641223,"about_ca_system_score_gemma":0.008621345,"threshold_uncertainty_score":0.25153565},"labels":[],"label_agreement":null},{"id":"W2610928412","doi":"","title":"Corrections to “Impacts of Strategic Bidding of Wind Power Producers on Electricity Markets”","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Bidding; Wind power; Electricity; Electricity market; Industrial organization; Environmental economics; Electricity generation; Economics; Power (physics); Business; Microeconomics; Natural resource economics; Engineering; Electrical engineering; Physics","score_opus":0.01899900792004544,"score_gpt":0.23931878113299124,"score_spread":0.2203197732129458,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2610928412","genre_codex":"editorial","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00043767056,0.0018030892,0.002508086,0.13429353,0.839435,0.000071105205,0.0076014306,0.0017093892,0.012140775],"genre_scores_gemma":[0.027962362,0.0059704487,0.009095828,0.21500693,0.3871461,0.00043341014,0.01207142,0.0044602645,0.3378532],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9885146,0.0017950445,0.0016600182,0.0014223148,0.005798508,0.000809511],"domain_scores_gemma":[0.9132034,0.017133359,0.003610019,0.0038921111,0.06049593,0.0016651981],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046153846,0.0023984907,0.0022612615,0.0046334728,0.0037177063,0.00584662,0.005330956,0.008948499,0.082979165],"category_scores_gemma":[0.08619962,0.0016514151,0.0052628466,0.004160952,0.0018254521,0.004004968,0.0027975317,0.013125113,0.0515246],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025238665,0.000010104977,0.000059735336,0.000049964936,0.000009225261,0.000054413715,0.000018451006,0.00008530895,0.000054130338,0.00068982725,0.9970776,0.0018660388],"study_design_scores_gemma":[0.000074192954,0.00003234444,0.0018087691,0.00024912998,0.00003848984,0.00016317258,0.000107803295,0.00057834864,0.0006051443,0.0033655297,0.99290437,0.00007276612],"about_ca_topic_score_codex":0.050472025,"about_ca_topic_score_gemma":0.051016588,"teacher_disagreement_score":0.082979165,"about_ca_system_score_codex":0.006975733,"about_ca_system_score_gemma":0.007828142,"threshold_uncertainty_score":0.27759296},"labels":[],"label_agreement":null},{"id":"W2611804852","doi":"10.5547/01956574.38.2.ddim","title":"Is Productivity Growth in Electricity Distribution Negative? An Empirical Analysis Using Ontario Data","year":2016,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Productivity; Econometrics; Electricity; Robustness (evolution); Economics; Electric power distribution; Parametric statistics; Distribution (mathematics); Index (typography); Statistics; Computer science; Mathematics; Engineering; Macroeconomics","score_opus":0.0335482927463454,"score_gpt":0.266312542570791,"score_spread":0.2327642498244456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2611804852","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9876236,0.00023780316,0.00044788056,0.00047966055,0.000004560426,0.000022756794,0.007517108,0.000015973474,0.0036507393],"genre_scores_gemma":[0.99040705,0.00024237137,0.00018655295,0.00003104037,0.0000083658515,0.000015730975,0.007613985,0.000006201139,0.0014887113],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99911004,0.00013193508,0.00004165068,0.000118756696,0.0003560145,0.00024159087],"domain_scores_gemma":[0.99128926,0.0030641202,0.0022000836,0.0004760062,0.0024498599,0.0005205974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012430198,0.00021838902,0.00032351792,0.0013729151,0.0007489128,0.0008836026,0.0005673373,0.0002681743,0.0017969615],"category_scores_gemma":[0.0093174875,0.00016969384,0.000363688,0.005530416,0.00080964476,0.0006338345,0.00050679484,0.00044877757,0.00028634584],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001157138,0.000035870915,0.98237085,0.00004361131,0.000054042626,0.00023124879,0.0007531346,0.0036660058,0.0003483145,0.000725719,0.0037993581,0.0078562],"study_design_scores_gemma":[0.000014275138,0.00001835868,0.98865974,0.00001393863,0.00002470845,0.000042190004,0.0011147753,0.0055893613,0.00017912746,0.00014987541,0.004182092,0.000011534568],"about_ca_topic_score_codex":0.9534957,"about_ca_topic_score_gemma":0.96846116,"teacher_disagreement_score":0.04650432,"about_ca_system_score_codex":0.013053001,"about_ca_system_score_gemma":0.007388882,"threshold_uncertainty_score":0.094706595},"labels":[],"label_agreement":null},{"id":"W2625034686","doi":"10.5547/01956574.39.1.dolm","title":"Ontario's Auction Market for Financial Transmission Rights: An Analysis of its Efficiency","year":2017,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Common value auction; Clearing; Microeconomics; Economics; Electricity; Business; Payment; Electricity market; Dutch auction; Reverse auction; Forward auction; Revenue equivalence; Auction theory; Finance","score_opus":0.007135290423424579,"score_gpt":0.21367130712984775,"score_spread":0.20653601670642316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2625034686","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91052127,0.00044497175,0.020850208,0.00077948277,0.000010308286,0.00015517553,0.00051320245,0.00005828107,0.06666702],"genre_scores_gemma":[0.9918961,0.00018803499,0.0017068784,0.000026462905,0.000009465508,0.000016147995,0.00013166778,0.000011026248,0.006014209],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99913305,0.00018212687,0.000030870797,0.000087584,0.000300694,0.00026562889],"domain_scores_gemma":[0.9956251,0.0023813169,0.0007079763,0.00037865128,0.00069137226,0.00021570631],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015116689,0.00025158608,0.00068929716,0.00079598284,0.00099634,0.0025401178,0.0013650644,0.00059862284,0.008788267],"category_scores_gemma":[0.008527898,0.00030428267,0.000688489,0.0011796497,0.0017212819,0.0020241714,0.0005530503,0.000596731,0.0002699374],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009935324,0.00034124986,0.04166008,0.0002466487,0.00020310181,0.0009781333,0.00076603785,0.3344094,0.0054081646,0.5656186,0.0076243496,0.041750744],"study_design_scores_gemma":[0.0002880003,0.00015119443,0.039785966,0.00003534438,0.00015647183,0.00028101075,0.000641088,0.8786104,0.0016403277,0.07132083,0.0070046782,0.00008482533],"about_ca_topic_score_codex":0.3526571,"about_ca_topic_score_gemma":0.31711102,"teacher_disagreement_score":0.6473429,"about_ca_system_score_codex":0.011117724,"about_ca_system_score_gemma":0.0054911594,"threshold_uncertainty_score":0.70120883},"labels":[],"label_agreement":null},{"id":"W2629831979","doi":"10.1109/ccece.2017.7946600","title":"Linearized power flow for stochastic optimization","year":2017,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Mathematical optimization; Economic dispatch; Computer science; Electric power system; Computation; Linear programming; Piecewise linear function; Power (physics); Iterative method; Piecewise; Power flow; Stochastic programming; AC power; Control theory (sociology); Algorithm; Mathematics","score_opus":0.009241897045171326,"score_gpt":0.22431749205290405,"score_spread":0.2150755950077327,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2629831979","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019974553,0.00031338935,0.9921665,0.0001903293,0.000030194618,0.000015510963,0.000060353916,0.00015539664,0.0050709196],"genre_scores_gemma":[0.6063534,0.0025642072,0.366453,0.00037309792,0.0003183907,0.00043822124,0.000571769,0.00051649235,0.02241146],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997323,0.00015083575,0.000007079065,0.000022423366,0.00007195659,0.000015379801],"domain_scores_gemma":[0.9993291,0.00047644135,0.000060798488,0.000035673103,0.00008419463,0.000013792796],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005446092,0.00069549255,0.00044174533,0.0005041749,0.0002252898,0.0007141853,0.00032580527,0.00038280044,0.0055449666],"category_scores_gemma":[0.0023989438,0.00025390572,0.00042919331,0.0006339382,0.00047963017,0.0008279056,0.0006128334,0.0011019973,0.000905302],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014171798,0.00001280667,0.00014117445,0.00008530532,0.00001526782,0.000026020301,0.000035042674,0.7719053,0.0010116545,0.20466612,0.002530205,0.019556897],"study_design_scores_gemma":[0.0000019256977,0.0000060577872,0.000029742836,0.000006402333,0.0000018420104,0.000007647054,0.000004073189,0.96475774,0.00016871255,0.03387214,0.0011409061,0.0000027563415],"about_ca_topic_score_codex":0.0029534146,"about_ca_topic_score_gemma":0.0016905755,"teacher_disagreement_score":0.0055449666,"about_ca_system_score_codex":0.0006075499,"about_ca_system_score_gemma":0.000607049,"threshold_uncertainty_score":0.01854974},"labels":[],"label_agreement":null},{"id":"W2633027710","doi":"10.1109/ccece.2017.7946626","title":"A new realistic optimization-free economic load dispatch method based on maps gathered from sliced fuel-cost curves","year":2017,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Slicing; Mathematical optimization; Computer science; Dimension (graph theory); Heuristic; Optimization problem; Function (biology); Key (lock); Automation; Set (abstract data type); Power system simulation; Field (mathematics); Point (geometry); Discrete optimization; Power (physics); Algorithm; Electric power system; Mathematics; Engineering","score_opus":0.012167432853258971,"score_gpt":0.24840263893381676,"score_spread":0.23623520608055779,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2633027710","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029442937,0.000090848036,0.99351877,0.00006554332,0.000033877448,0.000020205489,0.00005568921,0.00013875797,0.0031319703],"genre_scores_gemma":[0.22383997,0.00039167324,0.76777565,0.00007567168,0.000072200295,0.00017425521,0.0003500565,0.00027752915,0.007042945],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998658,0.0000381219,0.000005654736,0.000017663155,0.000060749397,0.000012063412],"domain_scores_gemma":[0.9998092,0.0000789931,0.000018958164,0.000020543068,0.000053881206,0.000018463503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037316384,0.0008177606,0.0006398722,0.00077895663,0.00030834452,0.00076864334,0.00089642673,0.0004967582,0.0039368114],"category_scores_gemma":[0.00096397987,0.00042343987,0.00060193887,0.0006734357,0.000401763,0.0010827091,0.0008780709,0.0008163587,0.0005920025],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039761668,0.000020684027,0.00026994827,0.00007998154,0.000027323338,0.00005767083,0.000053047697,0.90074176,0.0027550247,0.03854983,0.0021256409,0.055279385],"study_design_scores_gemma":[0.0000029804366,0.0000066335097,0.000033840304,0.0000041743597,0.0000020367308,0.000010196298,0.0000033956635,0.9941081,0.0002250692,0.004076431,0.0015235523,0.0000036461329],"about_ca_topic_score_codex":0.0027325593,"about_ca_topic_score_gemma":0.0027955396,"teacher_disagreement_score":0.0039368114,"about_ca_system_score_codex":0.0005124552,"about_ca_system_score_gemma":0.00083275244,"threshold_uncertainty_score":0.013169885},"labels":[],"label_agreement":null},{"id":"W2729205445","doi":"","title":"Alberta wholesale electricity market - Government and industry study","year":2013,"lang":"en","type":"article","venue":"Energy Transition and Policy Challenges,36th IAEE International Conference,June 16-20, 2013","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Government (linguistics); Electricity; Electricity market; Electricity retailing; Wholesale market; Commerce; Industrial organization; Engineering; Electrical engineering","score_opus":0.013327608459823373,"score_gpt":0.22211750406308808,"score_spread":0.20878989560326472,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2729205445","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89713204,0.00082450337,0.00040791437,0.0015761238,0.000026827365,0.00007396867,0.0022847177,0.000059864713,0.09761411],"genre_scores_gemma":[0.96217024,0.0004968266,0.00020586145,0.00023963937,0.000016994003,0.000017261094,0.0018606671,0.000015550688,0.03497702],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994487,0.00007572749,0.0000103831835,0.000049609287,0.00020123519,0.00021436946],"domain_scores_gemma":[0.9987902,0.00038104053,0.00015681211,0.00006906445,0.0003469235,0.0002559442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004811094,0.00027210428,0.00036277695,0.001338762,0.0019419538,0.0022541333,0.0011147005,0.0007065012,0.00931284],"category_scores_gemma":[0.0018034598,0.00023651886,0.0003960368,0.003852605,0.00096757535,0.0011362652,0.0006493581,0.0010582246,0.00070021517],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0047954735,0.0043580127,0.5225767,0.00037191066,0.00043649026,0.006121478,0.0054488247,0.047789957,0.00243247,0.19900985,0.116665274,0.08999352],"study_design_scores_gemma":[0.0005674396,0.00048518,0.8280995,0.00009587057,0.00026909757,0.0006481541,0.024095142,0.055802222,0.0016309448,0.011108942,0.07703775,0.00015976484],"about_ca_topic_score_codex":0.95331264,"about_ca_topic_score_gemma":0.9827162,"teacher_disagreement_score":0.97945714,"about_ca_system_score_codex":0.02054286,"about_ca_system_score_gemma":0.015386855,"threshold_uncertainty_score":0.14904958},"labels":[],"label_agreement":null},{"id":"W2731558198","doi":"10.55016/ojs/sppp.v9i1.42598","title":"The Challenge of Integrating Renewable Generation in the Alberta Electricity Market","year":2016,"lang":"en","type":"article","venue":"The School of Public Policy Publications","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Renewable energy; Electricity market; Electricity; Electricity retailing; Electricity generation; Business; Natural resource economics; Environmental economics; Economics; Engineering; Electrical engineering; Power (physics)","score_opus":0.021520033174254133,"score_gpt":0.24959826096645066,"score_spread":0.22807822779219653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2731558198","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19942479,0.00956762,0.011584422,0.15417287,0.0008792117,0.0001501567,0.00047853685,0.0001329835,0.6236095],"genre_scores_gemma":[0.9453934,0.004021283,0.0057061124,0.0037297718,0.00026686024,0.00002547711,0.00014639267,0.000027741227,0.040683042],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985342,0.00040916898,0.000017004817,0.00008487146,0.0005825422,0.00037222626],"domain_scores_gemma":[0.99910307,0.0002519503,0.000045510038,0.000035977755,0.0002702385,0.00029334505],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022834016,0.00020983927,0.0002373597,0.0005580178,0.00400105,0.007839869,0.0011704112,0.001890314,0.004309226],"category_scores_gemma":[0.003088115,0.00021247489,0.00022107466,0.0009986208,0.0022578386,0.002214993,0.0018897518,0.0017050194,0.00033369844],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014552206,0.00017491447,0.007550266,0.00015931582,0.00003688403,0.0012020086,0.001706854,0.05907352,0.0011977735,0.73144215,0.071973,0.12533791],"study_design_scores_gemma":[0.00007828252,0.00009972206,0.020918017,0.00037516173,0.00003770004,0.00033292754,0.014373375,0.07380544,0.0011630057,0.45583835,0.43283135,0.00014668515],"about_ca_topic_score_codex":0.68590516,"about_ca_topic_score_gemma":0.8601855,"teacher_disagreement_score":0.31409484,"about_ca_system_score_codex":0.021094242,"about_ca_system_score_gemma":0.037441943,"threshold_uncertainty_score":0.6318892},"labels":[],"label_agreement":null},{"id":"W2741065565","doi":"10.32040/2242-122x.2019.t350","title":"Design and operation of power systems with large amounts of wind power: Final summary report, IEA WIND Task 25, Phase four 2015-2017","year":2019,"lang":"en","type":"article","venue":"Publikationsdatenbank der Fraunhofer-Gesellschaft (Fraunhofer-Gesellschaft)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Wind power; Flexibility (engineering); Electric power system; Reliability engineering; Electricity; Grid; Stand-alone power system; Computer science; Environmental economics; Reliability (semiconductor); Power (physics); Automotive engineering; Engineering; Renewable energy; Electrical engineering; Distributed generation; Economics","score_opus":0.013904508215785552,"score_gpt":0.2367887213154214,"score_spread":0.22288421309963585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2741065565","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08791591,0.02497623,0.77128524,0.003225643,0.00073028886,0.0023444907,0.004184492,0.003426574,0.1019111],"genre_scores_gemma":[0.61088645,0.028773542,0.28054035,0.0003677408,0.00054773,0.0020831232,0.011035071,0.0015080377,0.064257994],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987332,0.00042567987,0.000060491184,0.00008966675,0.00058625004,0.000104752],"domain_scores_gemma":[0.9989606,0.00027731626,0.00009092724,0.000104977684,0.00048892305,0.00007718845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003533572,0.0014182432,0.0009619156,0.00067683327,0.00041014882,0.001784372,0.00068219175,0.00073994027,0.0048369807],"category_scores_gemma":[0.0019526352,0.0006792558,0.0010012888,0.0005563717,0.00039011825,0.0013507516,0.0006246953,0.0008984858,0.0021848432],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039451697,0.00021660369,0.0029247082,0.001964335,0.00019605817,0.00022561067,0.000132859,0.6631827,0.024070757,0.008798906,0.030351248,0.26754177],"study_design_scores_gemma":[0.00054751453,0.003031899,0.015591984,0.0014065143,0.00042943173,0.0003093476,0.0004317395,0.6400166,0.03756096,0.027462533,0.27306435,0.00014710773],"about_ca_topic_score_codex":0.004064038,"about_ca_topic_score_gemma":0.00774254,"teacher_disagreement_score":0.0048369807,"about_ca_system_score_codex":0.00093540543,"about_ca_system_score_gemma":0.002791719,"threshold_uncertainty_score":0.018687546},"labels":[],"label_agreement":null},{"id":"W2742926814","doi":"10.1109/cjece.2016.2611680","title":"Temporal and Spatial Load Management Methods for Cost and Emission Reduction","year":2017,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Science Foundation","keywords":"Computer science; Load management; Reduction (mathematics); Electric power system; Cost reduction; Load balancing (electrical power); Load shifting; Management system; Reliability engineering; Environmental economics; Power (physics); Operations management; Electricity; Business; Engineering; Economics","score_opus":0.00864113850204164,"score_gpt":0.23333170868172254,"score_spread":0.2246905701796809,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2742926814","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03804697,0.0008598504,0.9485044,0.00025648135,0.00005110661,0.0000751607,0.000054632095,0.00037737185,0.011774016],"genre_scores_gemma":[0.8363079,0.0008174822,0.1571127,0.0000843269,0.0000789517,0.00013966252,0.0000813309,0.00009448849,0.0052832086],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994248,0.00019955607,0.000020096391,0.00007401729,0.0002490391,0.000032439693],"domain_scores_gemma":[0.99950314,0.0001934544,0.00010294638,0.00007580771,0.00011137019,0.0000132790165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000771738,0.0005346567,0.00038648816,0.0005259083,0.00028514798,0.0005727982,0.00075876113,0.00025765316,0.0030279285],"category_scores_gemma":[0.0012342551,0.0001733361,0.0004936323,0.0008403415,0.00031474777,0.0011602753,0.00039654816,0.0004232654,0.00023639845],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008041372,0.00014053978,0.0011949397,0.00011089,0.00006578643,0.000026690283,0.000058464026,0.7833237,0.0047678533,0.029978368,0.0011817286,0.17907067],"study_design_scores_gemma":[0.000010016643,0.00007921592,0.00076693855,0.0000050073068,0.000016615046,0.000021821515,0.000024086494,0.9890912,0.0016202846,0.006078621,0.0022769908,0.000009206966],"about_ca_topic_score_codex":0.0033675805,"about_ca_topic_score_gemma":0.0056722853,"teacher_disagreement_score":0.0033675805,"about_ca_system_score_codex":0.000740185,"about_ca_system_score_gemma":0.0006850277,"threshold_uncertainty_score":0.010129392},"labels":[],"label_agreement":null},{"id":"W2749339364","doi":"10.37798/2008572321","title":"PROFITABILITY OF INCENTIVE PURCHASE PRICES FOR WIND FARM PROJECTS IN CROATIA","year":2022,"lang":"en","type":"article","venue":"Journal of Energy - Energija","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Physics; Humanities; Agricultural science; Environmental science; Art","score_opus":0.009383884865465953,"score_gpt":0.21622568857825775,"score_spread":0.2068418037127918,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2749339364","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99093115,0.00025106673,0.0013673028,0.000084127205,0.0000148209265,0.000027736365,0.00037646934,0.000042012627,0.006905247],"genre_scores_gemma":[0.99756086,0.000111601265,0.00061477046,0.0000058002115,0.0000037498266,0.000008360976,0.0003098321,0.000013395965,0.0013716127],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9987457,0.00023567426,0.00006711312,0.00019845914,0.00052441383,0.0002285495],"domain_scores_gemma":[0.99791163,0.0009778726,0.00045306326,0.000066709574,0.00045865242,0.00013198587],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014904347,0.00023074949,0.00047010463,0.0010873615,0.00038916213,0.0023134581,0.0004883526,0.00063583476,0.0030339775],"category_scores_gemma":[0.0036336745,0.00035357845,0.00054681674,0.001116303,0.00050374353,0.0009861436,0.0004667017,0.00080496754,0.00038426256],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014049666,0.0011501558,0.3688367,0.00036503034,0.00014046271,0.003972367,0.000686736,0.5104855,0.0067389985,0.025476065,0.005519192,0.07522388],"study_design_scores_gemma":[0.00013109556,0.00076687074,0.52553254,0.000113010356,0.00007726572,0.00072425534,0.0017827745,0.45499313,0.005746284,0.004187731,0.005785115,0.00015985924],"about_ca_topic_score_codex":0.022043511,"about_ca_topic_score_gemma":0.021093331,"teacher_disagreement_score":0.022043511,"about_ca_system_score_codex":0.002304761,"about_ca_system_score_gemma":0.0014663321,"threshold_uncertainty_score":0.043830454},"labels":[],"label_agreement":null},{"id":"W2751050958","doi":"10.1109/tpwrs.2017.2749303","title":"Security-Constrained Unit Commitment for AC-DC Grids With Generation and Load Uncertainty","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Power system simulation; Mathematical optimization; Iterative method; Computer science; Electric power system; Mathematics; Power (physics)","score_opus":0.016984519759478053,"score_gpt":0.2313541862627911,"score_spread":0.21436966650331307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2751050958","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13826954,0.0007435631,0.840849,0.0009475883,0.00007601792,0.00012777628,0.00023683203,0.00050810946,0.018241625],"genre_scores_gemma":[0.9441541,0.0002787505,0.052701272,0.00008404144,0.000017974697,0.000104154096,0.00013412173,0.00007740666,0.00244821],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99955815,0.00020380832,0.00001618356,0.000053639757,0.000117167605,0.000051027797],"domain_scores_gemma":[0.9992348,0.0004769419,0.00007939833,0.00005240083,0.00011278087,0.00004357966],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011067779,0.00065552135,0.00081391353,0.00024670566,0.0005982621,0.00089097983,0.0007542094,0.0006502511,0.0029284982],"category_scores_gemma":[0.0021397665,0.00034892544,0.0003428743,0.0009485269,0.0006843047,0.0008578054,0.0007356416,0.0011984525,0.00026761266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024239185,0.000008339374,0.000097887394,0.000011501841,0.0000049461964,0.000017861028,0.000008747177,0.9932448,0.00013410562,0.0035892597,0.0002784946,0.0025798061],"study_design_scores_gemma":[0.0000033514102,0.0000040880177,0.000014344649,0.0000010252855,9.035808e-7,0.0000020148802,0.000003141778,0.99863666,0.00007124189,0.0011650879,0.00009700166,0.0000010805487],"about_ca_topic_score_codex":0.01669771,"about_ca_topic_score_gemma":0.0097868005,"teacher_disagreement_score":0.01669771,"about_ca_system_score_codex":0.0011790084,"about_ca_system_score_gemma":0.0016489618,"threshold_uncertainty_score":0.03320104},"labels":[],"label_agreement":null},{"id":"W2751099879","doi":"10.2139/ssrn.3027705","title":"Optimal Procurement of Distributed Energy Resources","year":2017,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund; Government of Canada","keywords":"Procurement; Order (exchange); Electricity; Environmental economics; Distributed generation; Business; Distribution (mathematics); Industrial organization; Risk analysis (engineering); Microeconomics; Computer science; Operations research; Economics; Finance; Engineering; Renewable energy; Marketing","score_opus":0.006458869113208802,"score_gpt":0.21004139781942896,"score_spread":0.20358252870622015,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2751099879","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17699419,0.002012127,0.7393803,0.0034236736,0.0003359223,0.0002857084,0.0009495853,0.00033921175,0.07627932],"genre_scores_gemma":[0.95148957,0.0006506592,0.037692208,0.00009806823,0.000058529517,0.0001340444,0.00018733981,0.000097265896,0.009592347],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990982,0.00047897603,0.000033890825,0.00010446181,0.0001316899,0.00015273658],"domain_scores_gemma":[0.9982029,0.0012215535,0.00010292783,0.00014996935,0.00019257971,0.00013002862],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015894657,0.00091598684,0.0017178541,0.0007559147,0.00047586678,0.0026256384,0.0010591934,0.0017252308,0.008086257],"category_scores_gemma":[0.006935074,0.0010082038,0.0005607073,0.0018849864,0.001064421,0.0021929366,0.0013254117,0.0014670101,0.00059231574],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025336386,0.00010190918,0.00045371155,0.00022652338,0.00004904605,0.00012426302,0.000038248974,0.9063439,0.001054932,0.06746556,0.0031879228,0.020700566],"study_design_scores_gemma":[0.00006126157,0.000058355603,0.00030452924,0.000031959495,0.000022440383,0.000035521643,0.00007358192,0.900791,0.00056444365,0.096575476,0.0014684804,0.000012988042],"about_ca_topic_score_codex":0.002982656,"about_ca_topic_score_gemma":0.003326169,"teacher_disagreement_score":0.008086257,"about_ca_system_score_codex":0.001914971,"about_ca_system_score_gemma":0.0022074948,"threshold_uncertainty_score":0.02705127},"labels":[],"label_agreement":null},{"id":"W2755126874","doi":"10.15173/esr.v23i1.3311","title":"On the Impact of Wind Feed-in and Interconnections on Electricity Price in Germany","year":2017,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Spot contract; Electricity; Volatility (finance); Electricity market; Wind power; Economics; Electricity price; Electricity generation; Business; Monetary economics; Econometrics; Power (physics); Financial economics; Electrical engineering; Engineering","score_opus":0.022547213336629526,"score_gpt":0.2972966655673509,"score_spread":0.2747494522307214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2755126874","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99451244,0.0014031258,0.00078222726,0.00019098177,0.000008159468,0.0000033168433,0.00025852525,0.0000072628172,0.0028339152],"genre_scores_gemma":[0.99862933,0.0008736508,0.000080719044,0.000010451484,0.000006795977,0.0000012362743,0.00016187322,0.0000020733753,0.00023393432],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9998331,0.000039821993,0.000010783581,0.000026106787,0.000043083593,0.00004720377],"domain_scores_gemma":[0.9991233,0.00047903397,0.00027661782,0.000021447357,0.000057399822,0.00004222838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035340607,0.00023186188,0.00021341047,0.00048453652,0.00014036322,0.0009776629,0.00014898303,0.00025172575,0.0014718538],"category_scores_gemma":[0.0013424526,0.000083898856,0.000285362,0.0010896174,0.00025851687,0.0006669978,0.00028268527,0.00036553337,0.00013628861],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050497596,0.00029376746,0.66593903,0.000699972,0.0009060336,0.0045473306,0.00070381386,0.20230757,0.0064375685,0.027947633,0.0035628576,0.08614943],"study_design_scores_gemma":[0.000018020677,0.00024406833,0.9401315,0.00012176742,0.0004177889,0.0004189312,0.0011921221,0.046327036,0.0028370454,0.0026500581,0.005599686,0.00004201521],"about_ca_topic_score_codex":0.008825092,"about_ca_topic_score_gemma":0.00936017,"teacher_disagreement_score":0.008825092,"about_ca_system_score_codex":0.0005271909,"about_ca_system_score_gemma":0.00026017652,"threshold_uncertainty_score":0.017547429},"labels":[],"label_agreement":null},{"id":"W2762453449","doi":"10.1109/tste.2017.2761179","title":"Stochastic Operation Framework for Distribution Networks Hosting High Wind Penetrations","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Stochastic programming; Mathematical optimization; Wind power; Control reconfiguration; Computer science; Linear programming; Integer programming; Conic section; Stochastic optimization; Electric power system; Operations research; Power (physics); Reliability engineering; Engineering; Mathematics; Electrical engineering","score_opus":0.00704614382327904,"score_gpt":0.22094458083656762,"score_spread":0.2138984370132886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2762453449","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006195447,0.00027827368,0.9895828,0.00023522216,0.000039793005,0.0000390303,0.00013910174,0.00011932183,0.0033711086],"genre_scores_gemma":[0.8682636,0.0016745485,0.11528507,0.00021095933,0.00027082497,0.00040865203,0.0006633027,0.00018450896,0.01303853],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99850607,0.0005309241,0.000058542595,0.00025369672,0.00038766634,0.0002630632],"domain_scores_gemma":[0.99851865,0.00078127487,0.0002472498,0.00006110862,0.00028535948,0.000106482075],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025635029,0.0019384284,0.0014823801,0.00083219487,0.0006457259,0.0019853634,0.0020280078,0.0012592209,0.004182012],"category_scores_gemma":[0.0029846448,0.0009687864,0.0015461795,0.0009031813,0.0011288637,0.00183725,0.0012495968,0.0020334,0.0005610831],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011936607,0.000011991888,0.00017372191,0.000023158083,0.000015128954,0.000078743076,0.000019183553,0.9644273,0.00023613205,0.033087246,0.0003250617,0.0015903187],"study_design_scores_gemma":[0.0000024505214,0.000007958429,0.000041418938,0.0000020733141,0.000003587987,0.000008349634,0.0000048980037,0.9959312,0.000030613166,0.0037400592,0.0002242861,0.0000031354039],"about_ca_topic_score_codex":0.016960312,"about_ca_topic_score_gemma":0.011887546,"teacher_disagreement_score":0.016960312,"about_ca_system_score_codex":0.0020086172,"about_ca_system_score_gemma":0.0020946506,"threshold_uncertainty_score":0.033723235},"labels":[],"label_agreement":null},{"id":"W2764592786","doi":"10.1109/tpwrs.2003.821473","title":"An Investigation on the Reactive Power Support Service Needs of Power Producers","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"AC power; Electric power system; Generator (circuit theory); Power (physics); Compensation (psychology); Profit (economics); Volt-ampere reactive; Computer science; Power-flow study; Service (business); Electrical engineering; Engineering; Business; Voltage; Economics; Microeconomics; Marketing; Physics","score_opus":0.01257743117357926,"score_gpt":0.2048939229711233,"score_spread":0.19231649179754404,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2764592786","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98217565,0.00011815366,0.0063021355,0.0009985834,0.000007724309,0.00002651187,0.00007641461,0.00001803654,0.010276809],"genre_scores_gemma":[0.9977291,0.000083718296,0.0010942917,0.00003524815,0.000012492187,0.000009686042,0.000053647815,0.0000060223624,0.0009757498],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99927896,0.00030290819,0.0000297367,0.00009077649,0.00021950918,0.000077994126],"domain_scores_gemma":[0.9935475,0.0046137664,0.00052990805,0.00014949786,0.00094746245,0.00021178945],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00075384224,0.00016073023,0.00022187011,0.00028847082,0.0003486066,0.00067274185,0.00038073308,0.0007565636,0.0027620057],"category_scores_gemma":[0.008968659,0.00015228445,0.00010290107,0.00053920975,0.00034930004,0.002045654,0.00027886214,0.00039886977,0.00033716825],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0043974374,0.0011901769,0.42521924,0.0013787649,0.00012294037,0.007619701,0.020793192,0.06693034,0.12753966,0.04406432,0.0076676947,0.2930765],"study_design_scores_gemma":[0.00022056088,0.0032725336,0.48503396,0.00010545859,0.00017123675,0.00547094,0.04745395,0.3341546,0.04117318,0.04036206,0.04245956,0.000121966106],"about_ca_topic_score_codex":0.0011714592,"about_ca_topic_score_gemma":0.0013824847,"teacher_disagreement_score":0.0027620057,"about_ca_system_score_codex":0.00041223774,"about_ca_system_score_gemma":0.00027684227,"threshold_uncertainty_score":0.009239852},"labels":[],"label_agreement":null},{"id":"W2765000871","doi":"10.1109/tpwrs.2006.888986","title":"Formulation of Oligopolistic Competition in AC Power Networks: An NLP Approach","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Oligopoly; Node (physics); Competition (biology); Electric power system; Computer science; Operator (biology); Set (abstract data type); Market power; AC power; Nonlinear system; Mathematical optimization; Power (physics); Voltage; Operations research; Economics; Engineering; Mathematical economics; Mathematics; Microeconomics; Cournot competition; Electrical engineering","score_opus":0.009325294611882992,"score_gpt":0.21849887598709805,"score_spread":0.20917358137521505,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2765000871","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010517362,0.00049315393,0.96470004,0.0009958644,0.0000916936,0.00009170007,0.0002805476,0.000080302234,0.022749191],"genre_scores_gemma":[0.71102834,0.0015903276,0.2593679,0.00059261365,0.00042282854,0.00085227255,0.00040506906,0.00017828021,0.025562344],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993524,0.0003473062,0.000020373986,0.00008288216,0.0001413996,0.00005558038],"domain_scores_gemma":[0.9981889,0.0013565213,0.00015789943,0.000050889565,0.00018498166,0.000060731203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001403165,0.0010491872,0.0012162935,0.00061158306,0.0005666213,0.0017596831,0.0014153854,0.001689454,0.005683398],"category_scores_gemma":[0.002958392,0.0007082647,0.00065294345,0.0012060893,0.001066291,0.0014909493,0.0010650165,0.0014083091,0.0004125507],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007649403,0.000018157434,0.0001039629,0.000050102495,0.000009059054,0.00008578179,0.000021949008,0.94792205,0.00011971581,0.04813147,0.0006567153,0.0028732945],"study_design_scores_gemma":[0.000005547672,0.0000065765303,0.000023794288,0.0000055609153,0.000002131925,0.000009685218,0.000013730176,0.98189056,0.000028813698,0.017346708,0.00066430104,0.0000026436533],"about_ca_topic_score_codex":0.009622385,"about_ca_topic_score_gemma":0.008162821,"teacher_disagreement_score":0.009622385,"about_ca_system_score_codex":0.0015262666,"about_ca_system_score_gemma":0.0017793357,"threshold_uncertainty_score":0.019132793},"labels":[],"label_agreement":null},{"id":"W2766571422","doi":"10.1109/tpwrs.2017.2764420","title":"Power System Operational Adequacy Evaluation With Wind Power Ramp Limits","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Control theory (sociology); Range (aeronautics); Power (physics); Limit (mathematics); Engineering; Computer science; Reliability engineering; Mathematics; Electrical engineering","score_opus":0.014961855964609782,"score_gpt":0.2344076795999113,"score_spread":0.21944582363530152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2766571422","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6651457,0.0004518648,0.32266918,0.00014868498,0.00003304339,0.00023382074,0.0003242228,0.00039360402,0.010599879],"genre_scores_gemma":[0.99053276,0.00004588253,0.009135594,0.000007072522,0.000003918794,0.00003022282,0.000087885135,0.000010380113,0.00014628543],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99817944,0.0009874089,0.000101103826,0.0000973061,0.0005368655,0.00009783818],"domain_scores_gemma":[0.996478,0.0022928915,0.00039169964,0.00022583027,0.0005272967,0.00008426622],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029963823,0.00095218315,0.0005631394,0.00090948876,0.00020145372,0.0008924421,0.0004919061,0.0004891064,0.00063507294],"category_scores_gemma":[0.007336899,0.00018392043,0.00035930666,0.0005742271,0.00049160165,0.0012035387,0.00071262766,0.0006456074,0.00006696402],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000113057205,0.000047998383,0.0027784728,0.00006861787,0.000031190873,0.00020705593,0.000039547136,0.9779708,0.0017876473,0.0027371906,0.00018303753,0.014035347],"study_design_scores_gemma":[0.0000058685155,0.000088825785,0.0011109558,0.000007967392,0.000007111286,0.00002815233,0.000027954913,0.9967068,0.0011627598,0.00073567004,0.000111512636,0.0000064831174],"about_ca_topic_score_codex":0.0020074847,"about_ca_topic_score_gemma":0.0015278988,"teacher_disagreement_score":0.0029963823,"about_ca_system_score_codex":0.00041339986,"about_ca_system_score_gemma":0.00040091577,"threshold_uncertainty_score":0.01584661},"labels":[],"label_agreement":null},{"id":"W2770372302","doi":"10.1109/tpwrs.2017.2772044","title":"Management of Cascading Outage Risk Based on Risk Gradient and Markovian Tree Search","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cascading failure; Electric power system; Risk management; Computer science; Convergence (economics); Reliability engineering; Mathematical optimization; Linearization; Reduction (mathematics); Tree (set theory); Power (physics); Engineering; Mathematics; Nonlinear system","score_opus":0.008883866816628784,"score_gpt":0.21723417960548583,"score_spread":0.20835031278885704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2770372302","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015082765,0.0001386845,0.98317206,0.00009381223,0.0000129205,0.000038072027,0.000012923641,0.00017730541,0.0012715122],"genre_scores_gemma":[0.82972246,0.0002005864,0.16832736,0.00008355651,0.00003453481,0.00014363234,0.000061486964,0.00006316536,0.0013632942],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918383,0.0002878858,0.000049318758,0.00011120049,0.00027543338,0.00009242744],"domain_scores_gemma":[0.99821705,0.0010098628,0.0002536032,0.00008184136,0.0003426722,0.000094872375],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013708554,0.0007419067,0.0011344986,0.0009481248,0.00046163338,0.00074320094,0.0011329364,0.00065153703,0.0013467361],"category_scores_gemma":[0.004663097,0.0003935272,0.00068287505,0.00061548856,0.0006581044,0.0015515581,0.0011887323,0.0009587612,0.00016371897],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039393457,0.000035215282,0.0010773486,0.00003904383,0.000029485458,0.00005189924,0.00006283246,0.948848,0.0010254888,0.012398563,0.00053008454,0.035862587],"study_design_scores_gemma":[0.000002931753,0.000016661264,0.00008853977,0.000002766104,0.0000033692659,0.000011129351,0.000004242684,0.99728596,0.00015970327,0.0023259646,0.00009481382,0.0000039993897],"about_ca_topic_score_codex":0.005940106,"about_ca_topic_score_gemma":0.0049058176,"teacher_disagreement_score":0.005940106,"about_ca_system_score_codex":0.000920069,"about_ca_system_score_gemma":0.002096629,"threshold_uncertainty_score":0.011811078},"labels":[],"label_agreement":null},{"id":"W2774447441","doi":"10.1109/jsyst.2017.2775610","title":"A Branch-and-Cut Benders Decomposition Algorithm for Transmission Expansion Planning","year":2017,"lang":"en","type":"article","venue":"IEEE Systems Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Solver; Benchmark (surveying); Benders' decomposition; Mathematical optimization; Decomposition; Acceleration; Integer programming; Computer science; Key (lock); Transmission (telecommunications); Linear programming; Branch and cut; Algorithm; Mathematics","score_opus":0.017183723743612853,"score_gpt":0.27509051828375536,"score_spread":0.2579067945401425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2774447441","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0042208466,0.00016407575,0.990095,0.0000991013,0.000027551318,0.00008853908,0.00012407088,0.00031695724,0.004863899],"genre_scores_gemma":[0.10011347,0.0003653694,0.8941856,0.0000661263,0.000028233504,0.0003414118,0.00054483354,0.00017003453,0.0041849604],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951255,0.00017847333,0.000025721158,0.000081950544,0.0001460361,0.00005521859],"domain_scores_gemma":[0.99962604,0.00018211911,0.000045319543,0.000029613937,0.00009357503,0.000023419716],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00084258494,0.0012464521,0.0007598736,0.0008158078,0.00047729188,0.00094412145,0.0007492637,0.0009118245,0.0063731475],"category_scores_gemma":[0.0017175612,0.00049810763,0.00076622015,0.0013296879,0.00036737483,0.00077641243,0.00078164315,0.0014261486,0.0011392197],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007815044,0.00005368057,0.00026926943,0.00013049462,0.000025355383,0.00005765778,0.00005374153,0.86505,0.0018196977,0.015710413,0.0037945837,0.1129569],"study_design_scores_gemma":[0.00001686947,0.000036923524,0.00008374549,0.000014564058,0.000008125461,0.000026773916,0.00001701771,0.9911498,0.0007107652,0.00507784,0.0028513712,0.000006210656],"about_ca_topic_score_codex":0.005611433,"about_ca_topic_score_gemma":0.006411763,"teacher_disagreement_score":0.0063731475,"about_ca_system_score_codex":0.0008138046,"about_ca_system_score_gemma":0.001893708,"threshold_uncertainty_score":0.021320283},"labels":[],"label_agreement":null},{"id":"W2785415183","doi":"10.1109/pesgm.2017.8274600","title":"Optimal scheduling of energy storage to mitigate power quality issues in power systems","year":2017,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"York University","funders":"","keywords":"Profitability index; Energy storage; Arbitrage; Computer science; Profit (economics); Linear programming; Electric power system; Scheduling (production processes); Renewable energy; Grid; Mathematical optimization; Integer programming; Electricity; Profit maximization; Peaking power plant; Reliability engineering; Environmental economics; Distributed generation; Power (physics); Engineering; Economics; Electrical engineering; Finance; Microeconomics; Mathematics","score_opus":0.012445796722951053,"score_gpt":0.2661964663471483,"score_spread":0.25375066962419723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2785415183","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06935674,0.0004916366,0.92255753,0.00031979993,0.000096995704,0.00010136051,0.000063002284,0.00017671501,0.0068361177],"genre_scores_gemma":[0.944458,0.00017792311,0.053527433,0.000044456563,0.000030636445,0.000055479784,0.00003621456,0.000020655027,0.0016493329],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997671,0.00008923543,0.000012684019,0.000037874415,0.00004902211,0.000044197666],"domain_scores_gemma":[0.9995838,0.00024238198,0.00007189384,0.000018613719,0.00005769933,0.000025657233],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006736259,0.00060539565,0.00083854375,0.00029942644,0.00029922984,0.0007122027,0.0005412535,0.00043278182,0.001928863],"category_scores_gemma":[0.0014070931,0.0003101394,0.0002460118,0.00035329745,0.00042408746,0.00078141113,0.00040451443,0.000443025,0.00011681582],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056930174,0.00002815677,0.00018093854,0.000024719095,0.000010852204,0.000020448395,0.000016170985,0.98138565,0.0009082722,0.0045189587,0.0003971451,0.012451676],"study_design_scores_gemma":[0.000009337912,0.000019946066,0.000044004868,0.0000018608105,0.0000027637584,0.0000035619562,0.000005113246,0.9981989,0.00023150764,0.001316878,0.00016465662,0.0000014208617],"about_ca_topic_score_codex":0.004431724,"about_ca_topic_score_gemma":0.005120864,"teacher_disagreement_score":0.004431724,"about_ca_system_score_codex":0.00069057767,"about_ca_system_score_gemma":0.0014232966,"threshold_uncertainty_score":0.0088118315},"labels":[],"label_agreement":null},{"id":"W2786490471","doi":"10.1109/epec.2017.8286188","title":"A linear programing model for coordinated low-carbon generation and transmission expansion planning","year":2017,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Renewable energy; MATLAB; Linear programming; Electricity generation; Carbon fibers; Computer science; Reduction (mathematics); Transmission (telecommunications); Mathematical optimization; Energy (signal processing); Electric power system; Process (computing); Transmission system; Power (physics); Engineering; Algorithm; Telecommunications; Electrical engineering; Mathematics","score_opus":0.027991868269686467,"score_gpt":0.26291053872692166,"score_spread":0.2349186704572352,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2786490471","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0068475185,0.00029154937,0.97246706,0.00040417453,0.000051430077,0.00009882021,0.00045447153,0.0004031782,0.018981807],"genre_scores_gemma":[0.7148245,0.001246806,0.24104978,0.00032793698,0.000110610206,0.0013195724,0.0012438808,0.00030286465,0.03957402],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995309,0.00016175813,0.000017268983,0.00009761084,0.000114705435,0.00007771987],"domain_scores_gemma":[0.9994634,0.00031601076,0.00006781293,0.00001677686,0.00010757499,0.000028469218],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008237515,0.0010259525,0.0009743126,0.0004459836,0.0005264751,0.0015426002,0.0014744785,0.0015924324,0.01090133],"category_scores_gemma":[0.0012524358,0.0006628721,0.0009005432,0.00088214903,0.00052823685,0.0009542069,0.00084817933,0.0021202113,0.0012346738],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000095295,0.000010445477,0.00005219935,0.000028817929,0.000005357063,0.00003500694,0.000012297009,0.99197936,0.00018652402,0.0047861007,0.00040165678,0.002492662],"study_design_scores_gemma":[0.000005199551,0.00001193648,0.000025282186,0.000004597866,0.0000036516417,0.000007287466,0.000004922015,0.9973605,0.00009196143,0.001837155,0.00064465543,0.0000027997573],"about_ca_topic_score_codex":0.015049243,"about_ca_topic_score_gemma":0.013264716,"teacher_disagreement_score":0.015049243,"about_ca_system_score_codex":0.0012837357,"about_ca_system_score_gemma":0.0023748917,"threshold_uncertainty_score":0.036468565},"labels":[],"label_agreement":null},{"id":"W2787262780","doi":"10.1109/pesgm.2017.8274735","title":"Autoregressive moving average modeling of area control error","year":2017,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Autoregressive–moving-average model; Autoregressive model; Moving average; Computer science; Wind power; Time series; Automatic Generation Control; Series (stratigraphy); Power (physics); Electric power system; Control (management); Control theory (sociology); Econometrics; Mathematics; Engineering; Artificial intelligence; Machine learning","score_opus":0.01425240844530584,"score_gpt":0.22206702263643904,"score_spread":0.2078146141911332,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2787262780","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07618022,0.00055317726,0.9152095,0.00024821353,0.00012839893,0.000046437246,0.00030243542,0.0006843852,0.006647196],"genre_scores_gemma":[0.96229,0.0005076231,0.029086854,0.00005289539,0.000044864126,0.00009202063,0.000358416,0.000057408037,0.0075099356],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99942505,0.0001584122,0.000032519405,0.00016689143,0.0001573159,0.00005984697],"domain_scores_gemma":[0.9992341,0.00037491324,0.00016105999,0.00005330477,0.00016055805,0.000016136679],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008568346,0.0007205018,0.00081267173,0.00040328235,0.0003060659,0.00092729926,0.0012338532,0.0008247249,0.001544994],"category_scores_gemma":[0.001963821,0.00031060813,0.00069622,0.0008442091,0.00038845383,0.00076320645,0.00040375974,0.0010954572,0.00043410092],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001549951,0.000011373453,0.00044276429,0.000017050697,0.000017144093,0.0000316247,0.000016065562,0.9887826,0.00061473524,0.0032613084,0.00021036186,0.0065795165],"study_design_scores_gemma":[0.0000013399587,0.000009797549,0.00019399416,0.0000013203551,0.000003924807,0.0000043556247,0.0000016573856,0.9989766,0.00011831255,0.00053286186,0.00015300928,0.0000030191252],"about_ca_topic_score_codex":0.016123785,"about_ca_topic_score_gemma":0.0077775815,"teacher_disagreement_score":0.016123785,"about_ca_system_score_codex":0.00049552345,"about_ca_system_score_gemma":0.00055379036,"threshold_uncertainty_score":0.03205985},"labels":[],"label_agreement":null},{"id":"W2787411904","doi":"10.22109/jemt.2017.46746","title":"A Risk-based Two-stage Stochastic Optimal Power Flow Considering the Impact of Multiple Operational Uncertainties","year":2017,"lang":"en","type":"article","venue":"Journal of Energy Management and Technology","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"CVAR; Expected shortfall; Stochastic programming; Electricity market; Procurement; Wind power; Electric power system; Mathematical optimization; Electricity; Reliability engineering; Electricity generation; Computer science; AC power; Risk management; Operations research; Engineering; Economics; Power (physics); Mathematics; Finance","score_opus":0.0068710864479442635,"score_gpt":0.22521368846407816,"score_spread":0.2183426020161339,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2787411904","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012523618,0.00013074846,0.98499507,0.0001508423,0.000028439388,0.000058861173,0.00004943578,0.00007262544,0.001990313],"genre_scores_gemma":[0.81421703,0.00031410667,0.1801602,0.0000855319,0.00006596503,0.00025369273,0.00016114439,0.000077613135,0.004664611],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99931586,0.00032441065,0.00002703364,0.000104919316,0.0001384457,0.00008940431],"domain_scores_gemma":[0.99909794,0.00062244403,0.000090462265,0.000026625776,0.00011838584,0.000044123957],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017385796,0.001089417,0.001434995,0.00076938496,0.00047672258,0.0011796408,0.0010799689,0.0017282737,0.0025140499],"category_scores_gemma":[0.0024916797,0.0010025469,0.0014636131,0.0007391115,0.00073879526,0.0011755829,0.0009530036,0.0015325214,0.00016577002],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011969046,0.000010469438,0.00007533712,0.000014979611,0.000012771409,0.00002233542,0.000008980711,0.9941544,0.00017952123,0.0026608652,0.00009486675,0.0027535674],"study_design_scores_gemma":[0.0000027284907,0.000011333692,0.000026899977,0.0000019676418,0.0000024501176,0.000004554006,0.000001912557,0.9987791,0.000059199287,0.0010400659,0.00006732769,0.0000024818373],"about_ca_topic_score_codex":0.010520108,"about_ca_topic_score_gemma":0.005200065,"teacher_disagreement_score":0.010520108,"about_ca_system_score_codex":0.001089402,"about_ca_system_score_gemma":0.002105607,"threshold_uncertainty_score":0.020917714},"labels":[],"label_agreement":null},{"id":"W2787636654","doi":"10.1109/pesgm.2017.8274023","title":"Investigation of Ontario's electricity market behaviour and energy storage scheduling in the market based on model predictive control","year":2017,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University","funders":"","keywords":"Electricity market; Energy storage; Arbitrage; Model predictive control; Electricity; Renewable energy; Profit (economics); Computer science; Scheduling (production processes); Software deployment; Operations research; Microeconomics; Business; Economics; Control (management); Engineering; Operations management; Finance; Electrical engineering","score_opus":0.008131479506227236,"score_gpt":0.18721532500333612,"score_spread":0.1790838454971089,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2787636654","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9898818,0.0000964102,0.0036028407,0.00012313589,0.0000046227756,0.000027633896,0.00041364267,0.00003638079,0.0058135507],"genre_scores_gemma":[0.9984906,0.000048689693,0.000543859,0.0000040655013,0.0000011466597,0.000003884571,0.00017686542,0.0000032041921,0.0007275775],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998468,0.00002498961,0.000005450838,0.000020299656,0.00007220055,0.000030205525],"domain_scores_gemma":[0.99919266,0.00039766077,0.00013591674,0.000033752876,0.00021267249,0.000027438906],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044084512,0.00018708591,0.00025407644,0.00037326277,0.00034376179,0.0007106067,0.00043148978,0.00020592983,0.0011763177],"category_scores_gemma":[0.0017522258,0.000116208204,0.00018073851,0.00085560343,0.00034978392,0.00060363574,0.00014745144,0.00019252978,0.000053793396],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00061441486,0.00017512617,0.18042786,0.00021654314,0.00010891121,0.00087553734,0.0004173059,0.75591993,0.007172614,0.014462149,0.0034980837,0.036111556],"study_design_scores_gemma":[0.000013621252,0.00005871592,0.07836898,0.000005520673,0.000020886288,0.00004047017,0.00025756183,0.9180377,0.0012976083,0.0006185753,0.0012638441,0.000016465974],"about_ca_topic_score_codex":0.6193184,"about_ca_topic_score_gemma":0.7011662,"teacher_disagreement_score":0.38068157,"about_ca_system_score_codex":0.004859414,"about_ca_system_score_gemma":0.002612925,"threshold_uncertainty_score":0.76584697},"labels":[],"label_agreement":null},{"id":"W2787871984","doi":"10.1109/epec.2017.8286205","title":"A novel multiple fuels' cost function for realistic economic load dispatch needs","year":2017,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Function (biology); Computer science; Mathematical optimization; Polynomial; Mathematics","score_opus":0.017962004998650194,"score_gpt":0.22777222025174282,"score_spread":0.20981021525309262,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2787871984","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031316277,0.00047060524,0.9639573,0.00025089778,0.000071115435,0.00007219733,0.00016004301,0.00015214659,0.003549367],"genre_scores_gemma":[0.77700216,0.0006158306,0.21646127,0.000098182354,0.00011097924,0.00029455114,0.00061618484,0.00018837776,0.0046125012],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956113,0.00014676448,0.000023000865,0.000069373986,0.00015543117,0.000044366836],"domain_scores_gemma":[0.99936444,0.00035260952,0.00007218031,0.00005761415,0.00012849516,0.00002463228],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011354203,0.0013547672,0.0010618146,0.00092222146,0.00041410743,0.0012657853,0.0013670907,0.0012239652,0.002031132],"category_scores_gemma":[0.0026840626,0.00029354938,0.0007551533,0.001416069,0.00037216677,0.0023751073,0.000570788,0.0011879258,0.00032818763],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046197685,0.0000602997,0.0005953329,0.000082518156,0.00002427427,0.00008283393,0.000014346754,0.95203185,0.0011418286,0.0126162805,0.0009248124,0.032379374],"study_design_scores_gemma":[0.0000019715471,0.0000099090485,0.0001344835,0.0000028701386,0.000003528345,0.00001597935,0.0000029936677,0.99814034,0.00015765881,0.0010929892,0.00043369387,0.0000036550684],"about_ca_topic_score_codex":0.002394175,"about_ca_topic_score_gemma":0.0019452003,"teacher_disagreement_score":0.002394175,"about_ca_system_score_codex":0.0010670008,"about_ca_system_score_gemma":0.00097004353,"threshold_uncertainty_score":0.00774163},"labels":[],"label_agreement":null},{"id":"W2790780473","doi":"10.1109/tpwrs.2018.2805322","title":"An Incentive-Based Multistage Expansion Planning Model for Smart Distribution Systems","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"King Saud University","keywords":"Incentive; Distributed generation; Software deployment; Profit (economics); Payback period; Bidding; Linearization; Electric power system; Investment (military); Operations research; Computer science; Environmental economics; Business; Finance; Economics; Microeconomics; Renewable energy; Engineering; Power (physics); Electrical engineering","score_opus":0.01739433024462106,"score_gpt":0.25074176357628625,"score_spread":0.2333474333316652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2790780473","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029694239,0.0005493575,0.9418716,0.0007643749,0.00010525176,0.00020082854,0.00070388784,0.00030447272,0.025805926],"genre_scores_gemma":[0.899435,0.0006933944,0.07116757,0.00013376003,0.00005058182,0.00063264585,0.0004514431,0.0000874575,0.027348137],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99948823,0.00018359553,0.00002100935,0.00009120303,0.000114913164,0.000101148384],"domain_scores_gemma":[0.99943787,0.00030621488,0.00008088199,0.000018427747,0.00010519263,0.00005133999],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012141336,0.0009758557,0.0012265886,0.00064228504,0.0006694848,0.0015406352,0.0018500596,0.0019395142,0.007883291],"category_scores_gemma":[0.001473515,0.000955036,0.0011158712,0.0010629208,0.00081217114,0.0011763065,0.0011212998,0.0016054078,0.0005979585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015693722,0.000008682384,0.000082609506,0.000016857104,0.00000577091,0.000037494505,0.00001548495,0.99260086,0.00012906666,0.0054203924,0.00019152595,0.0014755408],"study_design_scores_gemma":[0.0000065029653,0.00000891741,0.000029546616,0.0000029636992,0.0000035428411,0.000004088918,0.000004602299,0.9981139,0.00003946673,0.0014861309,0.00029792712,0.000002489519],"about_ca_topic_score_codex":0.016992247,"about_ca_topic_score_gemma":0.016878057,"teacher_disagreement_score":0.016992247,"about_ca_system_score_codex":0.0017558042,"about_ca_system_score_gemma":0.0022849068,"threshold_uncertainty_score":0.033786654},"labels":[],"label_agreement":null},{"id":"W2792211322","doi":"10.1016/j.renene.2018.02.059","title":"GHG-mitigation oriented and coal-consumption constrained inexact robust model for regional energy structure adjustment – A case study for Jiangsu Province, China","year":2018,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"National Natural Science Foundation of China","keywords":"Coal; Greenhouse gas; Stochastic programming; Renewable energy; Environmental economics; Consumption (sociology); Energy consumption; Wind power; Electricity; Environmental science; Electricity generation; Investment (military); Natural resource economics; Economics; Power (physics); Engineering; Mathematical optimization; Waste management; Mathematics","score_opus":0.012970330250265004,"score_gpt":0.22075631681819743,"score_spread":0.20778598656793243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2792211322","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8575065,0.0005183675,0.12046843,0.00069412024,0.00008075887,0.000111788926,0.000844466,0.00049927045,0.019276297],"genre_scores_gemma":[0.99244964,0.00007156666,0.003686553,0.000019321204,0.0000073335227,0.000029478828,0.00017062885,0.000023452818,0.003541924],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997603,0.000073174575,0.0000092786295,0.000055429835,0.000037528924,0.00006418633],"domain_scores_gemma":[0.99959797,0.00019389299,0.00005192669,0.000029304914,0.00009191757,0.000035000947],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008091346,0.0009315539,0.0010871994,0.0004169893,0.0007739655,0.001346515,0.0013108298,0.002009662,0.0023932946],"category_scores_gemma":[0.0011153856,0.00051395723,0.0009286556,0.0005704639,0.00084755645,0.0006405846,0.00084724685,0.0009595522,0.00016018037],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024929197,0.000013999917,0.0003637772,0.000011933608,0.000009208668,0.000083080435,0.000009718031,0.99791104,0.0001617105,0.0004929132,0.00012418868,0.0007934864],"study_design_scores_gemma":[0.000010377587,0.000018225535,0.00037135868,0.0000013784664,0.0000081024555,0.0000061563032,0.000018077426,0.99910444,0.00008623032,0.00024645386,0.00012519916,0.0000039262304],"about_ca_topic_score_codex":0.19536683,"about_ca_topic_score_gemma":0.1158605,"teacher_disagreement_score":0.19536683,"about_ca_system_score_codex":0.001703732,"about_ca_system_score_gemma":0.0026600675,"threshold_uncertainty_score":0.38845932},"labels":[],"label_agreement":null},{"id":"W2793649869","doi":"10.1016/j.dib.2018.03.015","title":"Dataset for case studies of hydropower unit commitment","year":2018,"lang":"en","type":"article","venue":"Data in Brief","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Fundamental Research Funds for the Central Universities; National Key Research and Development Program of China","keywords":"Hydropower; Spillage; Computer science; Quarter (Canadian coin); Power (physics); Operations research; Power system simulation; Environmental science; Engineering; Electric power system; Electrical engineering; Waste management","score_opus":0.0796497880481104,"score_gpt":0.3505996372898815,"score_spread":0.2709498492417711,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2793649869","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0062292367,0.00017903103,0.0022731135,0.000281487,0.000088555906,0.00011454577,0.9848874,0.0009404499,0.0050062016],"genre_scores_gemma":[0.014813795,0.00010984179,0.0037542323,0.00010488146,0.000017129152,0.0003646343,0.97907615,0.00013715071,0.0016221177],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99840206,0.00033997564,0.00022836021,0.0003972082,0.00046682832,0.00016558132],"domain_scores_gemma":[0.99533147,0.0016482221,0.00040601633,0.0013512083,0.0010469636,0.00021610365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013097249,0.0013015226,0.00077169645,0.0022825708,0.0005456993,0.0011989155,0.002081536,0.0023163743,0.04101085],"category_scores_gemma":[0.00866071,0.00043622666,0.0011267456,0.0041548824,0.00026056278,0.0008683892,0.0009791217,0.001657321,0.023168655],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003659458,0.00030030397,0.011410804,0.0009661269,0.00016806388,0.00049365737,0.0000853137,0.027663486,0.0010125453,0.0042975717,0.927263,0.025973186],"study_design_scores_gemma":[0.0005440626,0.00015523996,0.01895351,0.0003930316,0.00007023796,0.0005789727,0.0003234763,0.03683911,0.003308148,0.009123002,0.92960966,0.00010150308],"about_ca_topic_score_codex":0.009057481,"about_ca_topic_score_gemma":0.016091492,"teacher_disagreement_score":0.04101085,"about_ca_system_score_codex":0.0010202233,"about_ca_system_score_gemma":0.0012243108,"threshold_uncertainty_score":0.13719499},"labels":[],"label_agreement":null},{"id":"W2795035203","doi":"","title":"Wind resources assessment of Cuba in future climate scenarios;Evaluación de los recursos eólicos de Cuba en futuros escenarios climáticos","year":2018,"lang":"es","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Environment and Climate Change Canada","funders":"","keywords":"Geography; Environmental protection","score_opus":0.005974751123479558,"score_gpt":0.28828726854922565,"score_spread":0.2823125174257461,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2795035203","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98991865,0.0008481304,0.0014826879,0.0007191392,0.00003709225,0.000047489284,0.0019677205,0.00003777578,0.0049413694],"genre_scores_gemma":[0.99609643,0.00044317896,0.000855806,0.000036442823,0.0000057494435,0.000045957953,0.0008553605,0.00001508064,0.0016460711],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99984694,0.0000646935,0.0000052190894,0.0000163814,0.000019728128,0.000046994206],"domain_scores_gemma":[0.99980706,0.00004470722,0.000029036966,0.000012349706,0.00007748923,0.000029319095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006312846,0.0005531352,0.0005849796,0.00093193783,0.0006972638,0.0019100115,0.00050268375,0.00052952336,0.0008109501],"category_scores_gemma":[0.0008099705,0.00024275306,0.0005010568,0.0017833192,0.00031754724,0.0005174406,0.00049655634,0.00040642484,0.000085002204],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018916327,0.00027300534,0.10474237,0.00042840463,0.00047156567,0.0013238131,0.0003894686,0.8420606,0.004164159,0.007343522,0.0055078613,0.031403508],"study_design_scores_gemma":[0.00031826523,0.00024552818,0.1907014,0.0002581133,0.00050769787,0.00017864566,0.0046823113,0.77953774,0.003054249,0.0031942679,0.017229918,0.00009180845],"about_ca_topic_score_codex":0.51310575,"about_ca_topic_score_gemma":0.5147061,"teacher_disagreement_score":0.51310575,"about_ca_system_score_codex":0.005577587,"about_ca_system_score_gemma":0.0032298919,"threshold_uncertainty_score":0.97952336},"labels":[],"label_agreement":null},{"id":"W2802332755","doi":"10.55016/ojs/sppp.v11i1.43169","title":"Capacity Market Design: Motivation and Challenges in Alberta’s Electricity Market","year":2018,"lang":"en","type":"article","venue":"The School of Public Policy Publications","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Electricity market; Business; Electricity; Industrial organization; Engineering; Electrical engineering","score_opus":0.06563642483577455,"score_gpt":0.24891384132560654,"score_spread":0.18327741648983198,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2802332755","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09559632,0.0048283692,0.011887085,0.21651274,0.00057956815,0.00023848117,0.0002498842,0.00015616309,0.66995144],"genre_scores_gemma":[0.9115284,0.0025678158,0.0065023173,0.021392636,0.00041492633,0.00010196449,0.00013266629,0.00008387723,0.057275508],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99400467,0.0011810728,0.00010270795,0.0006114334,0.0026584114,0.0014417311],"domain_scores_gemma":[0.9870618,0.005411087,0.0006929732,0.00039996894,0.003896189,0.002537969],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006614049,0.00028445205,0.0003942912,0.001029064,0.0095013175,0.016542824,0.0026223187,0.0068534752,0.007470519],"category_scores_gemma":[0.011493512,0.0005123487,0.00041935238,0.0015734349,0.010921648,0.005593152,0.0028496927,0.008043788,0.0005648758],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017876439,0.000066684705,0.002551224,0.00006945191,0.000007726805,0.0005403571,0.0016219706,0.0022901196,0.00036024238,0.95397276,0.024228191,0.014273376],"study_design_scores_gemma":[0.000072145085,0.00006590018,0.012568781,0.0004982257,0.000017462993,0.00037126435,0.012276425,0.013193704,0.0009011658,0.41405666,0.54574335,0.00023497085],"about_ca_topic_score_codex":0.57572234,"about_ca_topic_score_gemma":0.6698539,"teacher_disagreement_score":0.42427766,"about_ca_system_score_codex":0.046781264,"about_ca_system_score_gemma":0.05727033,"threshold_uncertainty_score":0.85355264},"labels":[],"label_agreement":null},{"id":"W2802676447","doi":"10.1007/s11149-018-9372-z","title":"Information and transparency in wholesale electricity markets: evidence from Alberta","year":2018,"lang":"en","type":"article","venue":"Journal of Regulatory Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Government of Alberta; University of Alberta","funders":"Canada First Research Excellence Fund","keywords":"Bidding; Transparency (behavior); Business; Public finance; Industrial organization; Electricity; Price discovery; Economics; Microeconomics; Finance","score_opus":0.005615980933468409,"score_gpt":0.1790408398679978,"score_spread":0.17342485893452939,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2802676447","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9524767,0.001522986,0.0004811921,0.004552865,0.000024838684,0.00002669706,0.00047653448,0.00002082356,0.040417403],"genre_scores_gemma":[0.99564666,0.0006727767,0.00010386432,0.000249713,0.000015356292,0.00000320199,0.00022035686,0.0000042924826,0.003083813],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9982084,0.0004421927,0.000060743452,0.00015005043,0.00079457974,0.0003440918],"domain_scores_gemma":[0.9535848,0.031407956,0.005879107,0.0014675973,0.0066628484,0.0009976317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029505375,0.00022331416,0.0004057559,0.0010333213,0.0017880234,0.0035851216,0.0009983915,0.0013679705,0.0059843105],"category_scores_gemma":[0.020237604,0.00025605084,0.00035062822,0.0023688416,0.0032284523,0.0017351394,0.0009180686,0.0016042327,0.00034935997],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.008379821,0.002227769,0.693527,0.00085469673,0.0011213127,0.004020411,0.011198898,0.03553083,0.002538102,0.09445847,0.04168099,0.10446184],"study_design_scores_gemma":[0.0017788989,0.0006928876,0.87522036,0.00053768215,0.0012028747,0.00038170925,0.018557595,0.02111922,0.00370561,0.03752127,0.038988303,0.0002935054],"about_ca_topic_score_codex":0.76222646,"about_ca_topic_score_gemma":0.81662977,"teacher_disagreement_score":0.23777354,"about_ca_system_score_codex":0.0067729354,"about_ca_system_score_gemma":0.008317473,"threshold_uncertainty_score":0.47834766},"labels":[],"label_agreement":null},{"id":"W2802815197","doi":"","title":"Photovoltaics and the Slovak electricity market","year":2018,"lang":"en","type":"preprint","venue":"Econstor (Econstor)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"McGill University; Grantová Agentura České Republiky; European Commission; Univerzita Karlova v Praze","keywords":"Slovak; Photovoltaics; Electricity; Photovoltaic system; Electricity market; Spot contract; Economics; Market penetration; Environmental economics; Econometrics; Business; Engineering; Financial economics; Marketing; Electrical engineering","score_opus":0.006434802487923034,"score_gpt":0.19621811828251917,"score_spread":0.18978331579459615,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2802815197","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97072583,0.004937958,0.0018399515,0.0012320895,0.00007060718,0.000012179755,0.00066125306,0.000036441113,0.020483727],"genre_scores_gemma":[0.9966929,0.0011101867,0.00013468428,0.000054151995,0.000019311748,0.000003782977,0.00023818835,0.000008788232,0.0017380805],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973935,0.00006848981,0.000016173315,0.00004334929,0.00005004589,0.00008251967],"domain_scores_gemma":[0.9997645,0.0000645633,0.00009689613,0.000015790247,0.00003675536,0.000021510357],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003347659,0.0002171455,0.00052157865,0.000505452,0.00041917432,0.0024613217,0.00018272238,0.00037984306,0.0038071086],"category_scores_gemma":[0.0007501703,0.00018105986,0.00059966155,0.0008616602,0.0007404827,0.00089308823,0.0006761157,0.00052331033,0.00030266133],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011211534,0.0002856052,0.15031363,0.00096172723,0.000686477,0.003014457,0.0005061457,0.5507869,0.007887663,0.2094199,0.014007496,0.06100879],"study_design_scores_gemma":[0.00037363506,0.0004973842,0.6355999,0.0005096929,0.0004512972,0.001310677,0.0029666864,0.21748456,0.0033568614,0.08864562,0.048640475,0.0001631942],"about_ca_topic_score_codex":0.01595037,"about_ca_topic_score_gemma":0.01109645,"teacher_disagreement_score":0.01595037,"about_ca_system_score_codex":0.0014153408,"about_ca_system_score_gemma":0.0012460627,"threshold_uncertainty_score":0.031715095},"labels":[],"label_agreement":null},{"id":"W2803436620","doi":"10.55016/ojs/sppp.v11i1.43162","title":"The Alberta Electrical Grid: What to Expect in the Next Few Years in Alberta","year":2018,"lang":"en","type":"article","venue":"The School of Public Policy Publications","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Grid; Environmental science; Geography; Meteorology; Geodesy","score_opus":0.023031192756098245,"score_gpt":0.2730696763947803,"score_spread":0.2500384836386821,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2803436620","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025136631,0.040290564,0.0020029768,0.65497833,0.012755231,0.000057140966,0.0026633171,0.0008901628,0.26122564],"genre_scores_gemma":[0.43734834,0.11518884,0.0063665635,0.13365252,0.0031154628,0.000059659502,0.0073159705,0.00040128548,0.2965514],"study_design_codex":"not_applicable","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9981171,0.00013035438,0.0000547615,0.00008114246,0.0009716822,0.00064511126],"domain_scores_gemma":[0.9963625,0.00012962116,0.00014523306,0.000053201587,0.0015456536,0.0017638018],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013572294,0.0004897983,0.00029505556,0.00075172033,0.003727551,0.008450803,0.0015897123,0.0034008762,0.010695806],"category_scores_gemma":[0.003024516,0.00019848981,0.0003741161,0.002475081,0.0018405066,0.0036020246,0.0013751797,0.0041700797,0.0038951426],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008039197,0.000068239235,0.013108351,0.00034084948,0.000018643794,0.0022301872,0.0007417397,0.002560464,0.00043142342,0.05657833,0.8379766,0.08586488],"study_design_scores_gemma":[0.000023722489,0.000035583802,0.017419744,0.0006583243,0.000021065482,0.0006042218,0.007418169,0.0011443464,0.00020058894,0.012704591,0.95970064,0.00006894937],"about_ca_topic_score_codex":0.8460892,"about_ca_topic_score_gemma":0.92389876,"teacher_disagreement_score":0.15391082,"about_ca_system_score_codex":0.029672543,"about_ca_system_score_gemma":0.058991995,"threshold_uncertainty_score":0.3096344},"labels":[],"label_agreement":null},{"id":"W2811293213","doi":"10.46661/revmetodoscuanteconempresa.2914","title":"Dinámica de inversión y competencia en generación eléctrica en un escenario de liberalización en el Perú: La importancia de los contratos de largo plazo","year":2019,"lang":"es","type":"article","venue":"Revista de Métodos Cuantitativos para la Economía y la Empresa","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"HEC Montréal; Pontificia Universidad Católica del Perú","keywords":"Physics; Humanities; Philosophy","score_opus":0.004699145159331302,"score_gpt":0.25564896917766855,"score_spread":0.25094982401833726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2811293213","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9767046,0.000449287,0.010578127,0.0006436773,0.0000076688475,0.000029471157,0.00028418825,0.000051680596,0.011251366],"genre_scores_gemma":[0.99637055,0.00022997512,0.00096662977,0.000024909543,0.0000036753142,0.000014688182,0.0000930645,0.000008175633,0.0022884011],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9995608,0.00017357183,0.00001667732,0.0000806373,0.000080184924,0.00008807868],"domain_scores_gemma":[0.9983417,0.00084134436,0.0003828779,0.00009446078,0.0002714151,0.000068206595],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094596914,0.00033260934,0.0003857919,0.0005658943,0.0003654111,0.0021500867,0.00047184672,0.0006478309,0.0045704353],"category_scores_gemma":[0.0038381035,0.00026649158,0.0005330398,0.0011357269,0.0007396889,0.0016157398,0.0010559085,0.0007153514,0.00023090793],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065008283,0.00017263486,0.31417903,0.00049377274,0.0005206446,0.0011905798,0.0032262267,0.5828565,0.00808674,0.03914298,0.001493093,0.04798769],"study_design_scores_gemma":[0.00013875672,0.00090191147,0.43684277,0.00029398812,0.0005088018,0.0003329321,0.011878108,0.48313755,0.0067639938,0.035871692,0.023140734,0.00018876743],"about_ca_topic_score_codex":0.032322302,"about_ca_topic_score_gemma":0.03324951,"teacher_disagreement_score":0.032322302,"about_ca_system_score_codex":0.0017047242,"about_ca_system_score_gemma":0.0009210413,"threshold_uncertainty_score":0.06426829},"labels":[],"label_agreement":null},{"id":"W2889124897","doi":"10.1109/ccece.2018.8447667","title":"An Approach for Managing DG Investment Proposals Considering System Constraints and DG Incentives","year":2018,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Incentive; Investment (military); Computer science; Business; Environmental economics; Risk analysis (engineering); Economics; Microeconomics; Political science","score_opus":0.010426379335487332,"score_gpt":0.2170592702783368,"score_spread":0.20663289094284948,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889124897","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035903659,0.000079640056,0.9933122,0.00020310789,0.000023734816,0.00014123815,0.000030155368,0.000085333326,0.0025342416],"genre_scores_gemma":[0.13486402,0.00025146766,0.860433,0.00008425763,0.00006249504,0.00037975446,0.00006831705,0.00006050017,0.0037962103],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998212,0.0006530934,0.00010525436,0.0002861541,0.00058575365,0.0001577718],"domain_scores_gemma":[0.9986745,0.0006245121,0.00022669659,0.00012565067,0.00024865053,0.000100025085],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002990502,0.0010495916,0.0011800791,0.0014442124,0.0008419035,0.0029083136,0.0026258393,0.0017784627,0.0039219665],"category_scores_gemma":[0.0032891051,0.00084369327,0.0012188985,0.0013743555,0.0009504615,0.0029434005,0.001832723,0.0015774034,0.0003652937],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050708506,0.0001508475,0.00074738654,0.0001738504,0.00012515765,0.0002262803,0.00022393388,0.7740123,0.0035112465,0.0904726,0.0014838686,0.12882179],"study_design_scores_gemma":[0.000034466044,0.00006788569,0.00015771798,0.00002530481,0.000041524567,0.00009040188,0.00007349299,0.96366227,0.0011719923,0.027866703,0.0067823213,0.000025927511],"about_ca_topic_score_codex":0.0034663442,"about_ca_topic_score_gemma":0.00605421,"teacher_disagreement_score":0.0039219665,"about_ca_system_score_codex":0.0018436919,"about_ca_system_score_gemma":0.003323971,"threshold_uncertainty_score":0.015815437},"labels":[],"label_agreement":null},{"id":"W2889206710","doi":"10.1109/ccece.2018.8447753","title":"Fuel Cost Modeling for Spinning Reserve Thermal Generating Units","year":2018,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Spinning; Grid; Thermal; Fuel efficiency; Polynomial; Computer science; Power (physics); Automotive engineering; Environmental science; Engineering; Mathematics; Mechanical engineering; Physics; Thermodynamics","score_opus":0.04075719262319818,"score_gpt":0.24928093539104698,"score_spread":0.2085237427678488,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889206710","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17170005,0.001676573,0.77210677,0.0006264442,0.00016903809,0.000099275756,0.00069964916,0.0001460363,0.05277617],"genre_scores_gemma":[0.969087,0.0007512532,0.013333309,0.000049590133,0.000029617497,0.00010042276,0.0002184204,0.000056167428,0.016374324],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997899,0.00005667601,0.000008002724,0.000033454984,0.00006964285,0.000042409],"domain_scores_gemma":[0.9997446,0.00014220606,0.000032325228,0.000015585316,0.000052002455,0.000013396844],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047392657,0.00084650645,0.00055653986,0.0005040692,0.00026247746,0.0010564206,0.0016570243,0.0009824295,0.0025336961],"category_scores_gemma":[0.0013010318,0.00030775805,0.0006719134,0.0007515065,0.000438455,0.0015032508,0.00032186034,0.0007773064,0.00035892273],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012456589,0.000009888371,0.00009686692,0.0000132657,0.00000383123,0.000025184272,0.000010067346,0.9822642,0.00027701526,0.014786099,0.00017511401,0.0023259013],"study_design_scores_gemma":[0.000001151273,0.000004202139,0.000042534062,0.000001989722,0.0000017817206,0.0000041121234,0.000003106256,0.9979273,0.000086455846,0.0016932329,0.00023227673,0.0000018366104],"about_ca_topic_score_codex":0.012817925,"about_ca_topic_score_gemma":0.0077280896,"teacher_disagreement_score":0.012817925,"about_ca_system_score_codex":0.0013178348,"about_ca_system_score_gemma":0.0007944521,"threshold_uncertainty_score":0.025486648},"labels":[],"label_agreement":null},{"id":"W2889709436","doi":"10.3390/su10093263","title":"A Multistage Distribution-Generation Planning Model for Clean Power Generation under Multiple Uncertainties—A Case Study of Urumqi, China","year":2018,"lang":"en","type":"article","venue":"Sustainability","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Electricity generation; Renewable energy; Electric power system; Environmental economics; Power (physics); Distributed generation; Environmental science; Reliability engineering; Computer science; Engineering; Economics; Electrical engineering","score_opus":0.02404227177702084,"score_gpt":0.2816275249424786,"score_spread":0.2575852531654578,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889709436","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.786404,0.00060618063,0.18765299,0.0011272479,0.00005394966,0.0002556682,0.0011991519,0.00020251809,0.022498347],"genre_scores_gemma":[0.9876895,0.00017174511,0.007277953,0.000023661583,0.00000605887,0.00010672462,0.0001924408,0.000013405027,0.004518594],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997546,0.00011094719,0.0000073249103,0.00003788507,0.000034927132,0.000054415763],"domain_scores_gemma":[0.99975663,0.00012639406,0.000030210262,0.000009832325,0.000045488112,0.00003140915],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059477065,0.0007893776,0.00064360193,0.0005344213,0.0007420845,0.0009775558,0.0012133804,0.00107272,0.0020716842],"category_scores_gemma":[0.0007244912,0.00052084133,0.000794015,0.0009062259,0.00055145693,0.0006454979,0.00068363297,0.0006256456,0.00010544224],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018379054,0.000011595051,0.00064888014,0.000010779222,0.000009920978,0.00013289019,0.00001919635,0.99647564,0.000126169,0.001503829,0.000108226435,0.000934554],"study_design_scores_gemma":[0.000009874296,0.000010383723,0.00025740592,0.0000015978093,0.0000058057235,0.000007778732,0.00001776526,0.9990079,0.00005296165,0.0004785732,0.0001469096,0.0000030465758],"about_ca_topic_score_codex":0.11869163,"about_ca_topic_score_gemma":0.07427521,"teacher_disagreement_score":0.11869163,"about_ca_system_score_codex":0.0024615312,"about_ca_system_score_gemma":0.0025159817,"threshold_uncertainty_score":0.23600155},"labels":[],"label_agreement":null},{"id":"W2893750247","doi":"10.1016/j.apenergy.2019.02.059","title":"Extended opportunity cost model to find near equilibrium electricity prices under non-convexities","year":2019,"lang":"en","type":"article","venue":"Applied Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Opportunity cost; Economics; Mixed complementarity problem; Electricity; Mathematical optimization; Electricity market; Profit (economics); Demand response; Total cost; Microeconomics; Computer science; Econometrics; Mathematics","score_opus":0.01285015146387695,"score_gpt":0.2085758620638039,"score_spread":0.19572571059992697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2893750247","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032043345,0.00059457123,0.95287126,0.0008026765,0.00014857066,0.000089056026,0.00026042256,0.00012518995,0.013064815],"genre_scores_gemma":[0.8830218,0.00060705194,0.090076864,0.0002643446,0.00016566779,0.00029147646,0.00035722292,0.00016786107,0.02504769],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992531,0.0003732851,0.000022315618,0.000094859606,0.00012519247,0.00013128019],"domain_scores_gemma":[0.9970812,0.0022576666,0.00015184963,0.00009185523,0.00027694873,0.00014043727],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021115346,0.0012774622,0.0022801254,0.0009856932,0.00044564006,0.0023752146,0.00245567,0.0023518687,0.008340211],"category_scores_gemma":[0.0076445644,0.0012530509,0.0011627837,0.0012912768,0.0012465352,0.00295553,0.0016170185,0.0025398352,0.0004929244],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003282299,0.000023020726,0.00012146148,0.000043648804,0.000027890725,0.000067427005,0.000016023567,0.96938366,0.00012227026,0.02709171,0.00080609345,0.0022639197],"study_design_scores_gemma":[0.000005842384,0.0000050611166,0.000024199595,0.0000034877255,0.0000040273812,0.0000054656543,0.000002644692,0.9940806,0.000024775667,0.005688888,0.00015208624,0.0000028901245],"about_ca_topic_score_codex":0.0073693055,"about_ca_topic_score_gemma":0.0052500633,"teacher_disagreement_score":0.008340211,"about_ca_system_score_codex":0.0015158368,"about_ca_system_score_gemma":0.0017182318,"threshold_uncertainty_score":0.027900755},"labels":[],"label_agreement":null},{"id":"W2896503442","doi":"10.11575/prism/30086","title":"Real-Time Pricing and Demand Response in Alberta's Electricity Market","year":2013,"lang":"en","type":"article","venue":"Open MIND","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Demand response; Electricity market; Economics; Electricity; Business; Microeconomics; Engineering","score_opus":0.00587148360492477,"score_gpt":0.216000513491014,"score_spread":0.21012902988608925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2896503442","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8833037,0.0006390516,0.0075752744,0.005260687,0.00011102599,0.000029994417,0.0006263223,0.00016880319,0.102285266],"genre_scores_gemma":[0.994789,0.00010532245,0.0003495714,0.00004943303,0.000011259257,0.0000019380927,0.00007805923,0.000010207875,0.0046052514],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99965477,0.00007501467,0.000008376688,0.000033882978,0.00011664931,0.000111384004],"domain_scores_gemma":[0.9994873,0.00017268682,0.000076238386,0.000022343213,0.00015617984,0.00008523179],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051386835,0.00018408975,0.00027573959,0.00042538674,0.0007121874,0.002659191,0.00097234605,0.00081195525,0.005979256],"category_scores_gemma":[0.002379227,0.00025142735,0.0002482971,0.0006910435,0.0009835988,0.0009618679,0.00047240048,0.0007948338,0.00032583164],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014957492,0.00044069992,0.05171268,0.00009416983,0.00010199855,0.0022001357,0.00090539915,0.6045867,0.006522456,0.25748366,0.028794205,0.04566219],"study_design_scores_gemma":[0.00013228139,0.000085685824,0.0594672,0.00002073486,0.0000240594,0.00018662427,0.0016293625,0.86081195,0.00058585487,0.06453511,0.012424088,0.00009708874],"about_ca_topic_score_codex":0.5313064,"about_ca_topic_score_gemma":0.5484661,"teacher_disagreement_score":0.4686936,"about_ca_system_score_codex":0.00884292,"about_ca_system_score_gemma":0.0033643895,"threshold_uncertainty_score":0.9429077},"labels":[],"label_agreement":null},{"id":"W2897063562","doi":"10.2139/ssrn.4218422","title":"An Efficient Data Driven Model for Generation Expansion Planning with Short Term Operational Constraints","year":2022,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Term (time); Computer science; Operations research; Engineering","score_opus":0.024277159022460828,"score_gpt":0.2581853617901574,"score_spread":0.23390820276769655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897063562","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027899178,0.00028669136,0.95807505,0.00056539924,0.0000985077,0.0001353537,0.0023524223,0.00091049616,0.009676869],"genre_scores_gemma":[0.8222835,0.00037705875,0.16481061,0.00020231516,0.000053949752,0.0005449548,0.0020369387,0.00029588808,0.009394909],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99962115,0.00010539681,0.000021115115,0.00007823005,0.00011519049,0.000058839043],"domain_scores_gemma":[0.99899536,0.000669116,0.00006584705,0.00006121079,0.00016191295,0.000046546727],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008817431,0.0009942837,0.001327045,0.00057019177,0.00042155964,0.0019725752,0.0017203302,0.0014241339,0.0066799996],"category_scores_gemma":[0.0023616415,0.0010261475,0.0009999861,0.0010454779,0.00058014534,0.0015771285,0.0010416529,0.0018005917,0.0009089412],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000120496725,0.000005972551,0.00003713614,0.0000096408585,0.0000038815756,0.000012667933,0.0000030838291,0.9964161,0.00007677671,0.0017595335,0.00017262211,0.0014905194],"study_design_scores_gemma":[0.0000039155625,0.0000029051018,0.000010379458,0.0000012119856,0.0000016515448,0.0000017968445,0.0000010217578,0.99840146,0.000052564053,0.00138353,0.00013839145,0.0000011794664],"about_ca_topic_score_codex":0.018152962,"about_ca_topic_score_gemma":0.017831352,"teacher_disagreement_score":0.018152962,"about_ca_system_score_codex":0.0014123134,"about_ca_system_score_gemma":0.0022548244,"threshold_uncertainty_score":0.036094606},"labels":[],"label_agreement":null},{"id":"W2898532498","doi":"10.1049/iet-rpg.2018.5136","title":"Flexibility of controllable power transformers for managing wind uncertainty using robust adjustable linearised optimal power flow","year":2018,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Etobicoke General Hospital","funders":"","keywords":"Power flow; Wind power; Flexibility (engineering); Control theory (sociology); Transformer; Computer science; Control engineering; Electric power system; Power (physics); Engineering; Electrical engineering; Voltage; Mathematics; Physics; Control (management)","score_opus":0.02435239974870437,"score_gpt":0.24279541440481442,"score_spread":0.21844301465611005,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2898532498","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019748053,0.00016573287,0.9748511,0.00010796441,0.000019495865,0.000057981517,0.000045022753,0.000115553084,0.004889288],"genre_scores_gemma":[0.9273412,0.00020665715,0.0700687,0.00003289508,0.000022452612,0.00014622608,0.00006719382,0.000052164873,0.002062543],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996958,0.00014504745,0.000011404296,0.00004289668,0.000071224466,0.000033605094],"domain_scores_gemma":[0.99957615,0.0002815802,0.00006808297,0.000024265708,0.000036863566,0.000013199884],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00080228236,0.0009772223,0.00066847325,0.0003355839,0.00024212316,0.0010252632,0.0005543879,0.00057999935,0.0019121899],"category_scores_gemma":[0.0015167515,0.00044417454,0.0007032198,0.00039110798,0.00062962476,0.00088652933,0.0007655556,0.0010266731,0.00018680857],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022391818,0.00001073906,0.000059266837,0.000022997774,0.000006855173,0.000020009664,0.000014115609,0.9893935,0.0006858773,0.004364357,0.00012681377,0.0052730846],"study_design_scores_gemma":[0.000003762632,0.000011039844,0.000015274249,0.000002223676,0.0000018604436,0.000002649939,0.0000024933338,0.99856573,0.00013414645,0.0011505955,0.000108375796,0.000001779548],"about_ca_topic_score_codex":0.003536795,"about_ca_topic_score_gemma":0.003015176,"teacher_disagreement_score":0.003536795,"about_ca_system_score_codex":0.0005384083,"about_ca_system_score_gemma":0.000646776,"threshold_uncertainty_score":0.0070323944},"labels":[],"label_agreement":null},{"id":"W2899642659","doi":"10.1109/tsg.2018.2879876","title":"A Novel Capacity Market Model With Energy Storage","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Electric Power System Optimization","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Independent Electricity System Operator","keywords":"Nameplate capacity; Capacity planning; Computer science; Procurement; Electricity; Electricity market; Capacity utilization; Investment (military); Capacity factor; Energy storage; Environmental economics; Electricity generation; Business; Power (physics); Microeconomics; Economics; Engineering; Electrical engineering","score_opus":0.011668284431967943,"score_gpt":0.18243881844231533,"score_spread":0.1707705340103474,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2899642659","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032463387,0.00059956696,0.9070374,0.0010155435,0.00018295328,0.00016126275,0.0007464618,0.00031460787,0.057478786],"genre_scores_gemma":[0.8952539,0.0006148314,0.058103528,0.00019116003,0.00011413956,0.00028644459,0.00033458642,0.00011267003,0.04498876],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957687,0.00013007851,0.000019194524,0.00007463956,0.00010948717,0.00008973898],"domain_scores_gemma":[0.999549,0.00019878212,0.00006058813,0.000028136676,0.00011238775,0.000051185823],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008174197,0.00075126305,0.0007932134,0.0005977699,0.00051697006,0.002112777,0.002491687,0.0016436458,0.010412102],"category_scores_gemma":[0.0015754183,0.00046052862,0.000986879,0.0010341657,0.00077819836,0.003306039,0.0010217645,0.0012898638,0.0006944312],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003517494,0.000028165861,0.00014079937,0.00004187937,0.000014256921,0.00014555614,0.000026848922,0.87932634,0.00073357346,0.11398638,0.0014009557,0.0041200947],"study_design_scores_gemma":[0.0000074090553,0.000008581075,0.000021091624,0.0000026079288,0.0000032887333,0.000020329475,0.0000069461785,0.99031925,0.000080148784,0.008708078,0.0008176867,0.000004613761],"about_ca_topic_score_codex":0.009386359,"about_ca_topic_score_gemma":0.0068807993,"teacher_disagreement_score":0.010412102,"about_ca_system_score_codex":0.0015942393,"about_ca_system_score_gemma":0.0020434211,"threshold_uncertainty_score":0.03483194},"labels":[],"label_agreement":null},{"id":"W2900270437","doi":"10.1108/ijesm-07-2018-0017","title":"Determining the efficacy of consolidating municipal electric utilities in Ontario, Canada","year":2018,"lang":"en","type":"article","venue":"International Journal of Energy Sector Management","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Equity (law); Consolidation (business); Shareholder; Electricity; Finance; Business; Operational efficiency; Debt; Mergers and acquisitions; Government (linguistics); Electric power distribution; Electric utility; Wilcoxon signed-rank test; Accounting; Economics; Marketing; Engineering; Economic growth; Corporate governance","score_opus":0.009803151229255328,"score_gpt":0.20842337625384263,"score_spread":0.19862022502458732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2900270437","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98829156,0.00026612708,0.00019279662,0.00062780245,0.0000061099145,0.00008229935,0.00033721275,0.0000123606715,0.010183696],"genre_scores_gemma":[0.9963858,0.00026199967,0.00029002462,0.00006403926,0.0000032176727,0.000013633134,0.00019860141,0.0000025119916,0.0027800815],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9961551,0.00037326376,0.00020251832,0.00027800127,0.0021343676,0.00085687765],"domain_scores_gemma":[0.9786227,0.0025304921,0.0049196784,0.0005200005,0.011399346,0.0020076938],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021253251,0.00018944465,0.00023910141,0.0010749281,0.0030685237,0.0023913884,0.0012671533,0.00038936065,0.0018436322],"category_scores_gemma":[0.016022304,0.0002646198,0.00018132782,0.0027708418,0.0018662474,0.00070951594,0.0011281446,0.00045979983,0.00017389315],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023247105,0.00008305374,0.94805425,0.00015922483,0.000046171077,0.0003496805,0.0064731077,0.0013602087,0.0015906031,0.0016869515,0.002086867,0.037877254],"study_design_scores_gemma":[0.000010341137,0.00007507314,0.97937864,0.000053554057,0.000024510018,0.00005783355,0.011554518,0.00089230086,0.00058386126,0.00011018854,0.0072414116,0.000017924269],"about_ca_topic_score_codex":0.98972535,"about_ca_topic_score_gemma":0.9961851,"teacher_disagreement_score":0.064489,"about_ca_system_score_codex":0.064489,"about_ca_system_score_gemma":0.07720598,"threshold_uncertainty_score":0.46790266},"labels":[],"label_agreement":null},{"id":"W2901068911","doi":"10.1522/revueot.v14n2.626","title":"Analyse des avantages et des coûts de la politique de bas prix de l’énergie hydroélectrique : le cas d’Alcan au Saguenay–Lac-Saint-Jean","year":2005,"lang":"fr","type":"article","venue":"Revue Organisations & territoires","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Humanities; Geology; Environmental science; Art","score_opus":0.00995397934426707,"score_gpt":0.2537351508766761,"score_spread":0.24378117153240902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901068911","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9357886,0.0011754975,0.0042800717,0.0047111646,0.00005116179,0.00001891539,0.00014836012,0.000039878905,0.053786416],"genre_scores_gemma":[0.98685396,0.0002931554,0.00064929394,0.00006810852,0.000018868934,0.000011193843,0.000050530423,0.000018146058,0.012036738],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99908864,0.00032041795,0.000021735019,0.00013170623,0.00024249144,0.00019508218],"domain_scores_gemma":[0.9981006,0.001144927,0.00021634247,0.00006436794,0.00036555715,0.000108356406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016173637,0.00027642265,0.00044923,0.0006032337,0.0011173588,0.004954949,0.00039686507,0.0010125847,0.0060353843],"category_scores_gemma":[0.004031754,0.00022162063,0.0004177016,0.00091010897,0.0011359499,0.0012234272,0.0007183788,0.0014327652,0.00034909727],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017617096,0.00056738424,0.16562784,0.00034900947,0.0007638037,0.0019817222,0.008097652,0.24769136,0.008685841,0.43432498,0.00975128,0.120397404],"study_design_scores_gemma":[0.00028511634,0.00062766206,0.52935946,0.00028947127,0.00029473813,0.0006263226,0.02321726,0.2560971,0.0068939887,0.06222909,0.119861,0.00021877566],"about_ca_topic_score_codex":0.15784165,"about_ca_topic_score_gemma":0.15073095,"teacher_disagreement_score":0.8421583,"about_ca_system_score_codex":0.007421889,"about_ca_system_score_gemma":0.002994558,"threshold_uncertainty_score":0.3138458},"labels":[],"label_agreement":null},{"id":"W2902729105","doi":"10.1051/e3sconf/20186402007","title":"Innovation of price adjustment mechanisms to support investment in solar power in Germany","year":2018,"lang":"en","type":"article","venue":"E3S Web of Conferences","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Investment (military); Tariff; Economics; Electricity; Microeconomics; Renewable energy; Order (exchange); Mechanism (biology); Econometrics; Quarter (Canadian coin); Environmental economics; Industrial organization; Engineering; International economics; Finance","score_opus":0.013715395686445163,"score_gpt":0.23566550271582676,"score_spread":0.2219501070293816,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2902729105","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97915787,0.00027326666,0.016043635,0.00030832153,0.000027962255,0.00002944566,0.000110052075,0.00016349398,0.0038858643],"genre_scores_gemma":[0.99856853,0.00004838455,0.0010876048,0.000008047459,0.0000038403614,0.00000393345,0.000019866393,0.0000040259997,0.00025583128],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99952674,0.00015660645,0.00003267935,0.00008168345,0.00010906608,0.00009334417],"domain_scores_gemma":[0.9990013,0.00041076005,0.000303189,0.00010611082,0.00012357211,0.000054986238],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015882129,0.00025604866,0.00018976664,0.00042699455,0.00011290767,0.000882244,0.0005134149,0.0003942312,0.001150414],"category_scores_gemma":[0.0041014696,0.00012859383,0.0004048528,0.00032324414,0.00029669955,0.00078098825,0.00039199283,0.0003263045,0.00013779475],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011570987,0.00060014863,0.10352617,0.000442673,0.0003682372,0.0013277986,0.00041624517,0.54576045,0.031829223,0.08779706,0.003736208,0.22303864],"study_design_scores_gemma":[0.0001908688,0.00084754603,0.13348033,0.00005136875,0.0002630234,0.0002657434,0.00032007459,0.82044077,0.02128569,0.016455237,0.006308277,0.00009105089],"about_ca_topic_score_codex":0.0040156334,"about_ca_topic_score_gemma":0.0021687474,"teacher_disagreement_score":0.0040156334,"about_ca_system_score_codex":0.0010227029,"about_ca_system_score_gemma":0.00056799577,"threshold_uncertainty_score":0.008399367},"labels":[],"label_agreement":null},{"id":"W2903796948","doi":"10.1016/j.aej.2018.01.014","title":"Real coded genetic algorithm based transmission system loss estimation in dynamic economic dispatch problem","year":2018,"lang":"en","type":"article","venue":"Alexandria Engineering Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electric power system; Transmission loss; Genetic algorithm; Computer science; Scheduling (production processes); Economic dispatch; Mathematical optimization; Transmission (telecommunications); Data loss; Real-time computing; Power (physics); Algorithm; Telecommunications; Mathematics","score_opus":0.0023044777476028,"score_gpt":0.1860449147385256,"score_spread":0.1837404369909228,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2903796948","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17059045,0.0004401364,0.8233736,0.00040275374,0.000040357325,0.000090729634,0.000066086264,0.00029750008,0.004698369],"genre_scores_gemma":[0.92832434,0.0001749735,0.06953033,0.0000638915,0.000012633693,0.00009318828,0.000093824274,0.000031157564,0.0016756497],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995852,0.00017085079,0.000016136992,0.000060160215,0.00011232582,0.00005530835],"domain_scores_gemma":[0.9990522,0.00061885983,0.000116231866,0.000028455715,0.00016114712,0.000023030738],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012437736,0.0006445779,0.00066229113,0.000860671,0.00027586793,0.0010163452,0.00078256463,0.0007298722,0.00069944613],"category_scores_gemma":[0.0030036317,0.00028547004,0.00028769684,0.0007200759,0.0005695997,0.0007496857,0.00039066494,0.00064775284,0.00009567394],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021243126,0.000016349797,0.00029907588,0.000008697269,0.00000859873,0.000015819784,0.000010018116,0.991286,0.00023837949,0.00063296856,0.000120300945,0.0073425425],"study_design_scores_gemma":[0.0000029445307,0.0000072277876,0.00010569593,0.0000014680949,0.0000019243416,0.0000035403143,0.0000029902271,0.9994836,0.00009375399,0.00026498493,0.000030529973,0.0000013730372],"about_ca_topic_score_codex":0.01461225,"about_ca_topic_score_gemma":0.0069479696,"teacher_disagreement_score":0.01461225,"about_ca_system_score_codex":0.0013081415,"about_ca_system_score_gemma":0.0012096893,"threshold_uncertainty_score":0.029054403},"labels":[],"label_agreement":null},{"id":"W2905241030","doi":"10.1049/iet-rpg.2018.5635","title":"Interval based robust chance constrained allocation of demand response programs in wind integrated power systems","year":2018,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Etobicoke General Hospital","funders":"","keywords":"Demand response; Interval (graph theory); Wind power; Mathematical optimization; Electric power system; Computer science; Operations research; Power (physics); Reliability engineering; Mathematics; Engineering; Electrical engineering","score_opus":0.021562658318523775,"score_gpt":0.21533182182985594,"score_spread":0.19376916351133217,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2905241030","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05357307,0.0005415623,0.93755865,0.00027447738,0.000045610228,0.000071818766,0.00014741272,0.0001602045,0.007627212],"genre_scores_gemma":[0.9732357,0.000291248,0.02335889,0.00004634082,0.00003064712,0.00013141493,0.000083540384,0.000048105285,0.0027740716],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992473,0.00033038002,0.000023841276,0.00010526108,0.00015975417,0.0001334567],"domain_scores_gemma":[0.9990858,0.00054923433,0.00018492993,0.000026613521,0.000102244856,0.00005121385],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013277808,0.0010481246,0.0010785105,0.00044212845,0.0003397561,0.0015199481,0.0009644777,0.000999238,0.001986994],"category_scores_gemma":[0.0025185954,0.0006198428,0.00069962384,0.0007006697,0.000839818,0.001077167,0.0007391051,0.0009823317,0.00014960085],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017449656,0.0000050333815,0.00005090739,0.000010543013,0.000007989666,0.000015823856,0.0000065320305,0.99555296,0.00013331881,0.0029466061,0.00007572264,0.001177105],"study_design_scores_gemma":[0.0000032951768,0.000013451303,0.000039635353,0.0000021686105,0.0000032238977,0.000002795055,0.0000025970296,0.99859244,0.000059575745,0.0012104379,0.00006801026,0.0000023335947],"about_ca_topic_score_codex":0.006956081,"about_ca_topic_score_gemma":0.0038975596,"teacher_disagreement_score":0.006956081,"about_ca_system_score_codex":0.0011423298,"about_ca_system_score_gemma":0.0010164565,"threshold_uncertainty_score":0.013831139},"labels":[],"label_agreement":null},{"id":"W2906588870","doi":"10.1109/pesgm.2018.8586552","title":"Modeling Hourly Original Operating Reserve Prices in Electricity Market","year":2018,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; Independent Electricity System Operator","funders":"","keywords":"Econometrics; Electricity market; Electricity; Market price; Markov process; Economics; Markov chain; Computer science; Microeconomics; Statistics; Mathematics; Engineering; Electrical engineering","score_opus":0.010716723759911083,"score_gpt":0.22891659802805178,"score_spread":0.2181998742681407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2906588870","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5866032,0.0002640516,0.4086249,0.0002671509,0.000046592497,0.000047073343,0.00037689175,0.00025807583,0.0035121161],"genre_scores_gemma":[0.9915451,0.00011380311,0.007114896,0.000017701526,0.000014361789,0.000024629633,0.00012749087,0.00001623027,0.0010257827],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999741,0.000118228076,0.000013621502,0.00004535736,0.000049993356,0.000031834643],"domain_scores_gemma":[0.9983346,0.0012865345,0.0001948868,0.00007070729,0.00008117291,0.0000320505],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010984323,0.00042169748,0.0005120289,0.00027023815,0.00013737782,0.00083131035,0.00084365625,0.00071101653,0.0007164747],"category_scores_gemma":[0.0037708946,0.00035729117,0.0005141611,0.00033779148,0.00038407126,0.0012578148,0.00026869052,0.0007906763,0.00011968323],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024517634,0.000019807532,0.00056208007,0.000008959667,0.000006480512,0.000023133203,0.000012308891,0.9922488,0.00023786988,0.0048845476,0.00009792932,0.0018735066],"study_design_scores_gemma":[0.0000011155174,0.0000035108394,0.0000965724,3.9302986e-7,7.5397736e-7,0.0000025958975,0.0000010041672,0.9992544,0.0000369971,0.0005862798,0.00001520501,0.0000011301165],"about_ca_topic_score_codex":0.0059288037,"about_ca_topic_score_gemma":0.003856512,"teacher_disagreement_score":0.0059288037,"about_ca_system_score_codex":0.00058173144,"about_ca_system_score_gemma":0.0004742689,"threshold_uncertainty_score":0.011788607},"labels":[],"label_agreement":null},{"id":"W2907825999","doi":"10.5539/mas.v13n1p237","title":"Planning the Expansion of Long-Term Transmission Networks Using a Cycle-Based Formulation","year":2018,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universidad Tecnológica de Pereira; Conselho Nacional de Desenvolvimento Científico e Tecnológico; Coordenação de Aperfeiçoamento de Pessoal de Nível Superior; Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Term (time); Computer science; Mathematical optimization; Transmission (telecommunications); Graph; Network planning and design; Transmission network; Polynomial expansion; Mathematics; Theoretical computer science; Telecommunications","score_opus":0.016397785060329875,"score_gpt":0.24704321675122304,"score_spread":0.23064543169089316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2907825999","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0095820185,0.00046113806,0.98213917,0.00016543726,0.000028301332,0.00007500047,0.00011961497,0.00008192035,0.0073473626],"genre_scores_gemma":[0.49771404,0.002000096,0.48652482,0.0001134799,0.00009714044,0.0005740632,0.0005012709,0.00018465213,0.012290434],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99980456,0.00008308423,0.0000075191992,0.000031683045,0.000050275237,0.000022875896],"domain_scores_gemma":[0.9997008,0.00019883525,0.00003140874,0.000012634187,0.00003745411,0.00001893237],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005434831,0.0008346122,0.0005777736,0.0005475539,0.00036493503,0.00078888243,0.00087768066,0.0007012519,0.004559664],"category_scores_gemma":[0.0008879314,0.0004160302,0.0006581534,0.0010270738,0.00049831613,0.00095525576,0.000549722,0.0008884558,0.0002751482],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000055955015,0.000009699652,0.00007431256,0.00003140641,0.000008209533,0.000027497616,0.000012484221,0.9790662,0.00025501123,0.011434326,0.00037854127,0.008696632],"study_design_scores_gemma":[0.0000038694757,0.000014830274,0.00003448734,0.00000776477,0.000005005678,0.000011697861,0.000008206772,0.99183136,0.00012924979,0.0068687857,0.001081651,0.0000030983833],"about_ca_topic_score_codex":0.0075015505,"about_ca_topic_score_gemma":0.014813934,"teacher_disagreement_score":0.0075015505,"about_ca_system_score_codex":0.0008972001,"about_ca_system_score_gemma":0.0013655247,"threshold_uncertainty_score":0.015253603},"labels":[],"label_agreement":null},{"id":"W2908798837","doi":"10.1016/j.ijindorg.2018.12.004","title":"Environmental implications of market structure: Shale gas and electricity markets","year":2019,"lang":"en","type":"article","venue":"International Journal of Industrial Organization","topic":"Electric Power System Optimization","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Boom; Electricity; Natural resource economics; Market power; Electric power; Market structure; Natural gas; Economics; Factor market; Industrial organization; Oil shale; Electricity market; Natural gas prices; Shale gas; Business; Greenhouse gas; Commerce; Market economy; Power (physics); Environmental science; Waste management; Environmental engineering; Ecology; Engineering","score_opus":0.0041845607577583694,"score_gpt":0.17933104240146563,"score_spread":0.17514648164370727,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2908798837","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90915406,0.0018620563,0.008319951,0.014322142,0.00015930558,0.000045272332,0.00039616722,0.000035379417,0.06570565],"genre_scores_gemma":[0.99656904,0.000375527,0.00016296451,0.000106157975,0.00007944559,0.000003816859,0.000026159527,0.0000046036594,0.0026722623],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9996958,0.00010595294,0.000007606903,0.000031995245,0.00006659586,0.00009199953],"domain_scores_gemma":[0.9983865,0.00075658667,0.00035560102,0.000055274377,0.00027866336,0.00016740279],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073205365,0.00024467005,0.00052471814,0.0004285519,0.00047376717,0.0027964383,0.0004861988,0.0013811206,0.010595568],"category_scores_gemma":[0.0033941069,0.00018540281,0.00032890614,0.00050144235,0.0013284772,0.0030015334,0.0007121975,0.0011083285,0.00022554748],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00080394396,0.0005838098,0.017795864,0.00022711017,0.00014284236,0.0007440416,0.00018707763,0.14514484,0.00455295,0.800143,0.0056639095,0.024010526],"study_design_scores_gemma":[0.00041165523,0.00041753254,0.032724768,0.00007151585,0.00009622243,0.000112327856,0.0015393718,0.1376322,0.0025289694,0.81417435,0.010224559,0.00006643778],"about_ca_topic_score_codex":0.007320009,"about_ca_topic_score_gemma":0.010498594,"teacher_disagreement_score":0.010595568,"about_ca_system_score_codex":0.0013710781,"about_ca_system_score_gemma":0.001403598,"threshold_uncertainty_score":0.03544569},"labels":[],"label_agreement":null},{"id":"W2910316427","doi":"10.1109/epec.2018.8598460","title":"How to Improve Linear Fuel-Cost Function to Compete with Quadratic and Cubic Functions","year":2018,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Piecewise; Quadratic function; Polynomial; Cubic function; Piecewise linear function; Applied mathematics; Quadratic equation; Function (biology); Mathematical optimization; Mathematics; Linear programming; Computer science; Mathematical analysis","score_opus":0.005455024507742452,"score_gpt":0.1850551011650152,"score_spread":0.17960007665727273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2910316427","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008125543,0.0009873594,0.9818818,0.00035967256,0.00018412352,0.000035048717,0.00003823675,0.00039460865,0.007993531],"genre_scores_gemma":[0.33740273,0.0023019263,0.64365417,0.0005214697,0.00028533512,0.00027050124,0.00026331024,0.0013532547,0.0139471665],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990752,0.00022142292,0.000052086023,0.00018903143,0.00033093133,0.00013137353],"domain_scores_gemma":[0.99920744,0.00034456459,0.000045352957,0.000073425246,0.0002990034,0.000030201729],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014328996,0.0011440057,0.00096679473,0.00090865325,0.0005089641,0.0012226938,0.0014870982,0.0010718527,0.00680543],"category_scores_gemma":[0.0048165796,0.00036689182,0.0011263415,0.0009265702,0.000428805,0.0027071084,0.0011531035,0.0018357814,0.002359076],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017700873,0.00020421385,0.0020030611,0.0006788943,0.00008103336,0.00025667145,0.00020483037,0.43959793,0.014739501,0.19428083,0.017426476,0.33034962],"study_design_scores_gemma":[0.000010817071,0.00004221525,0.00018619423,0.00002269184,0.000018701738,0.00006896385,0.000017464085,0.9790325,0.0022322447,0.011163193,0.007190051,0.000014915673],"about_ca_topic_score_codex":0.0062910523,"about_ca_topic_score_gemma":0.0034255206,"teacher_disagreement_score":0.00680543,"about_ca_system_score_codex":0.00075851823,"about_ca_system_score_gemma":0.0012006835,"threshold_uncertainty_score":0.022766411},"labels":[],"label_agreement":null},{"id":"W2914259667","doi":"10.1016/j.rser.2019.109275","title":"Short-term electricity trading for system balancing: An empirical analysis of the role of intraday trading in balancing Germany's electricity system","year":2019,"lang":"en","type":"article","venue":"Renewable and Sustainable Energy Reviews","topic":"Electric Power System Optimization","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Term (time); Incentive; Quarter (Canadian coin); Electricity system; Work (physics); Electricity market; Wind power; Business; Economics; Microeconomics; Electricity generation; Engineering; Electrical engineering; Power (physics)","score_opus":0.007356296106826883,"score_gpt":0.2243196095912892,"score_spread":0.2169633134844623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2914259667","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99648213,0.0006978916,0.0010567066,0.00025409003,0.00001522162,0.000005543103,0.000098098986,0.000012907461,0.0013775306],"genre_scores_gemma":[0.99935895,0.00010998095,0.00008816123,0.000013478341,0.000011554921,0.000001358713,0.00007566858,0.000002723519,0.00033806483],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9996074,0.00013200956,0.000029221354,0.00006980613,0.000082254934,0.00007935964],"domain_scores_gemma":[0.99256176,0.0053830175,0.0012355202,0.00022613778,0.00028327887,0.00031023365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020316057,0.00033086233,0.00037582265,0.0004153894,0.00033384355,0.0019337835,0.0006972954,0.0008523006,0.002556175],"category_scores_gemma":[0.007411358,0.00022449512,0.00045290738,0.00059487723,0.00054729515,0.002279838,0.0005743971,0.0010571274,0.00025394518],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0039072116,0.001067909,0.60639167,0.00051349186,0.001459895,0.0022509466,0.0007624482,0.26109296,0.008703401,0.033259727,0.0069300127,0.07366035],"study_design_scores_gemma":[0.00012323761,0.000667436,0.5432666,0.00010569076,0.0006995786,0.0004798692,0.0016622266,0.43697387,0.0030887309,0.009187088,0.003663246,0.0000824114],"about_ca_topic_score_codex":0.0054672677,"about_ca_topic_score_gemma":0.0077160797,"teacher_disagreement_score":0.0054672677,"about_ca_system_score_codex":0.0008230461,"about_ca_system_score_gemma":0.00050484505,"threshold_uncertainty_score":0.010870874},"labels":[],"label_agreement":null},{"id":"W2915257683","doi":"10.62986/dp2018.21","title":"Assessment of the Philippine Electric Power Industry Reform Act","year":2018,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"International Development Research Centre; Korea Electric Power Corporation; U.S. Department of Energy","keywords":"Restructuring; Repeal; Electric power industry; Competition (biology); Electricity; Business; Mains electricity; Quality (philosophy); Service (business); Distribution (mathematics); Economics; Industrial organization; Power (physics); Market economy; Public economics; Economic policy; Marketing; Finance; Political science; Engineering","score_opus":0.008485963978570541,"score_gpt":0.24406079994698315,"score_spread":0.2355748359684126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2915257683","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12829588,0.0101333065,0.0036622141,0.07983424,0.0012305975,0.0011877845,0.0024946732,0.00035415898,0.7728072],"genre_scores_gemma":[0.85320497,0.0054970956,0.0044182623,0.03754558,0.0009551723,0.0010245651,0.001419676,0.00014955715,0.09578518],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9717407,0.00574832,0.00068657496,0.00080297183,0.018358652,0.0026627418],"domain_scores_gemma":[0.9783851,0.005140708,0.0023389044,0.00066329277,0.012035534,0.00143642],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02011744,0.00087089255,0.00050438475,0.0048706518,0.0026253571,0.01256658,0.0019413937,0.0038684646,0.012167706],"category_scores_gemma":[0.037269555,0.00044828144,0.0006887889,0.0031766968,0.003596812,0.003812132,0.004335617,0.00524849,0.001478589],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026539213,0.00045148015,0.025240649,0.0016769699,0.00016155749,0.0013360168,0.00481273,0.0072802617,0.0011991721,0.7025456,0.13571236,0.11931782],"study_design_scores_gemma":[0.00007346972,0.0005782463,0.08743408,0.0017045632,0.00013229898,0.00034817884,0.0058467654,0.0051261773,0.0022012328,0.018716833,0.87766886,0.00016925737],"about_ca_topic_score_codex":0.057321962,"about_ca_topic_score_gemma":0.04496703,"teacher_disagreement_score":0.057321962,"about_ca_system_score_codex":0.021358436,"about_ca_system_score_gemma":0.027021447,"threshold_uncertainty_score":0.15496701},"labels":[],"label_agreement":null},{"id":"W2925133149","doi":"10.5547/01956574.40.4.asid","title":"Merchant Storage Investment in a Restructured Electricity Industry","year":2019,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Social Sciences and Humanities Research Council of Canada; HEC Montréal; Universitetet i Oslo; Aalto-Yliopisto; University of Guelph","keywords":"Profit (economics); Restructuring; Microeconomics; Electricity; Electricity market; Energy storage; Economics; Business; Social Welfare; Investment (military); Industrial organization; Environmental economics; Finance; Power (physics); Electrical engineering; Engineering","score_opus":0.004821282474285495,"score_gpt":0.1824414710785164,"score_spread":0.17762018860423093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2925133149","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8564846,0.00034261745,0.07837444,0.0019909814,0.000039127095,0.0000939117,0.0003622793,0.00015779743,0.06215423],"genre_scores_gemma":[0.9933988,0.00007178858,0.0014600495,0.00002951065,0.0000049810483,0.000013524174,0.000022780001,0.0000049244723,0.004993605],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99948716,0.00018499859,0.000016530026,0.00009512627,0.00007993753,0.00013622311],"domain_scores_gemma":[0.9991709,0.0003211593,0.00019990647,0.000077386554,0.00008438225,0.00014638908],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008326918,0.00046448904,0.00045827075,0.0003836899,0.00058102136,0.0028351303,0.0010397903,0.0017802836,0.0052811834],"category_scores_gemma":[0.0015411489,0.0004731105,0.00064901874,0.000415349,0.0020154947,0.0026537965,0.0015186622,0.0012271256,0.0003596197],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002714671,0.0001317813,0.002792893,0.0000562342,0.000036805042,0.00060784386,0.00011167294,0.81373155,0.0034159836,0.17347457,0.0006259212,0.00474325],"study_design_scores_gemma":[0.000066601,0.0002462627,0.001940088,0.000025676289,0.000048311427,0.00011950067,0.00020660374,0.9378367,0.0012461226,0.056716733,0.0015063625,0.000041100106],"about_ca_topic_score_codex":0.008072164,"about_ca_topic_score_gemma":0.009711552,"teacher_disagreement_score":0.008072164,"about_ca_system_score_codex":0.0032180117,"about_ca_system_score_gemma":0.0014419828,"threshold_uncertainty_score":0.023348391},"labels":[],"label_agreement":null},{"id":"W2929089835","doi":"10.1109/jsyst.2019.2903555","title":"Optimal Planning With Technology Selection for Wind Power Plants in Power Distribution Networks","year":2019,"lang":"en","type":"article","venue":"IEEE Systems Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Time horizon; Wind power; Selection (genetic algorithm); Engineering; Net present value; Operations research; Plan (archaeology); Site selection; Investment (military); Electric power system; Mathematical optimization; Work (physics); Power (physics); Computer science; Production (economics); Economics; Mathematics","score_opus":0.004115305147500938,"score_gpt":0.19933647169034283,"score_spread":0.19522116654284188,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2929089835","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028132511,0.0006539308,0.9636209,0.0002798644,0.000024568824,0.00012881494,0.0001277908,0.0000925728,0.006939128],"genre_scores_gemma":[0.7978147,0.0010156345,0.19750871,0.00006361885,0.000041471863,0.00031532923,0.00017763907,0.000063349435,0.0029995956],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99913543,0.00045621803,0.000023570024,0.00010540227,0.00018097731,0.00009849988],"domain_scores_gemma":[0.9995055,0.00032621316,0.00006283598,0.000013624347,0.000055479955,0.00003626236],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013256491,0.0011902086,0.0012229,0.00094297575,0.00058401277,0.0014500272,0.00073749083,0.00083314016,0.0020295668],"category_scores_gemma":[0.0018420973,0.000928242,0.0007371524,0.0012450769,0.0009786768,0.0013487192,0.0007645463,0.0009124281,0.00020702898],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008451284,0.0000082316965,0.00005810984,0.000014127089,0.00000562518,0.000016178803,0.000009235924,0.9927341,0.00011734593,0.0040778667,0.00011434276,0.0028363601],"study_design_scores_gemma":[0.0000104753,0.000023402852,0.000049373,0.0000070838073,0.000005254463,0.000006844849,0.00001275033,0.99369276,0.00012447423,0.005655678,0.00040726492,0.0000045937577],"about_ca_topic_score_codex":0.0071674837,"about_ca_topic_score_gemma":0.010708675,"teacher_disagreement_score":0.0071674837,"about_ca_system_score_codex":0.001629979,"about_ca_system_score_gemma":0.0023254338,"threshold_uncertainty_score":0.01425153},"labels":[],"label_agreement":null},{"id":"W2942309913","doi":"10.1051/ro/2019043","title":"A Non-Linear-Threshold-Accepting Function Based Algorithm for the Solution of Economic Dispatch Problem","year":2019,"lang":"en","type":"article","venue":"RAIRO - Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Mathematical optimization; Economic dispatch; Computer science; Harmony search; Benchmark (surveying); Heuristics; Heuristic; Electric power system; Algorithm; Power (physics); Mathematics","score_opus":0.029269800762894614,"score_gpt":0.30914104292080496,"score_spread":0.27987124215791037,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2942309913","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009305116,0.00014357362,0.98736316,0.00009759212,0.000037696915,0.000059738737,0.00002270339,0.00027599765,0.0026944599],"genre_scores_gemma":[0.2901214,0.00023010522,0.7042601,0.00014614486,0.00003687759,0.0003838267,0.00020060396,0.00014238265,0.004478543],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996468,0.00010649588,0.00002110265,0.00006064759,0.00010052353,0.00006439473],"domain_scores_gemma":[0.9996865,0.00018144325,0.00003553948,0.000020175727,0.000056714696,0.000019714485],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065958034,0.0007188463,0.00081738003,0.0006797133,0.0005151611,0.0008024532,0.0013722171,0.0009292162,0.003264579],"category_scores_gemma":[0.0012007917,0.00025873655,0.0006400668,0.00087562826,0.00043496705,0.00078717934,0.0006227084,0.0011203442,0.0005004787],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014941269,0.00013585381,0.0005528737,0.00013270727,0.000051032905,0.00009587313,0.000096207616,0.78543735,0.0031519795,0.028198043,0.003607139,0.17839152],"study_design_scores_gemma":[0.0000137552415,0.000027897018,0.000052452728,0.0000039893675,0.000004038064,0.000018687424,0.0000067125593,0.9965245,0.00043463262,0.0022388627,0.0006704949,0.0000038890903],"about_ca_topic_score_codex":0.0030791264,"about_ca_topic_score_gemma":0.002594907,"teacher_disagreement_score":0.003264579,"about_ca_system_score_codex":0.0007672814,"about_ca_system_score_gemma":0.0014431133,"threshold_uncertainty_score":0.010921121},"labels":[],"label_agreement":null},{"id":"W2945101307","doi":"10.1109/tsg.2019.2918258","title":"Tracing Power With Circuit Theory","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Electric Power System Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; National Science Foundation","keywords":"Tracing; Scalability; Computer science; Network topology; Generator (circuit theory); Power (physics); Electric power system; AC power; Distributed computing; Mathematical optimization; Topology (electrical circuits); Electronic engineering; Engineering; Electrical engineering; Mathematics; Computer network","score_opus":0.0049849590426283424,"score_gpt":0.17116982138278153,"score_spread":0.16618486234015317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2945101307","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032856243,0.000388207,0.98156184,0.00031160662,0.00009507908,0.000027447297,0.00008429695,0.00034173264,0.01390423],"genre_scores_gemma":[0.45924512,0.0030312827,0.5076052,0.0005934935,0.00035785293,0.00034772855,0.00039858665,0.00080330117,0.027617456],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99961287,0.00013159386,0.000014098566,0.00006820681,0.00013773437,0.000035514506],"domain_scores_gemma":[0.99907327,0.0005707038,0.000048950544,0.00018091722,0.00010599699,0.000020137448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005939405,0.0008585802,0.0006528725,0.0011149538,0.00062294793,0.0019054916,0.0009797959,0.0009655613,0.008298969],"category_scores_gemma":[0.0033912365,0.0005235114,0.0008185843,0.0010628261,0.0017073781,0.002898098,0.0011690786,0.0017436758,0.0011123201],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023580345,0.000023987162,0.00036943975,0.00010091866,0.000018517996,0.00007686,0.00012662286,0.32228765,0.0021116566,0.62784463,0.0027979466,0.044218272],"study_design_scores_gemma":[0.000010503657,0.000013281791,0.00007231912,0.000021807233,0.0000054910474,0.000034719647,0.000021512164,0.60559607,0.00065764785,0.38304824,0.010508978,0.000009529446],"about_ca_topic_score_codex":0.0034876512,"about_ca_topic_score_gemma":0.002821785,"teacher_disagreement_score":0.008298969,"about_ca_system_score_codex":0.0012703261,"about_ca_system_score_gemma":0.0007652423,"threshold_uncertainty_score":0.02776277},"labels":[],"label_agreement":null},{"id":"W2945323006","doi":"10.1016/j.dib.2019.104034","title":"Observed switches and derived profitability indicators for peaking power plants: Northeast U.S. 2001–2009","year":2019,"lang":"en","type":"article","venue":"Data in Brief","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Norges Forskningsråd; Réseau de cancérologie Rossy; Technische Universität Chemnitz","keywords":"Profitability index; Power (physics); Research article; Computer science; Environmental science; Agricultural engineering; Business; Physics; Engineering; Finance; Thermodynamics","score_opus":0.02429771943391006,"score_gpt":0.23145719261489103,"score_spread":0.20715947318098096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2945323006","genre_codex":"empirical","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8578785,0.00019817904,0.001735043,0.0002570342,0.00002026943,0.000018268105,0.13442026,0.00010877619,0.0053636627],"genre_scores_gemma":[0.8964594,0.00021457166,0.0010478176,0.000060809558,0.000012845589,0.000022550472,0.09942051,0.000020607533,0.00274092],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999841,0.0000181457,0.000022214774,0.00005016131,0.000046984966,0.000021587179],"domain_scores_gemma":[0.9982046,0.000368209,0.0007581012,0.00008771015,0.0004955453,0.00008591382],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032428125,0.00021573991,0.00011244513,0.0011466591,0.00014582642,0.00043302405,0.00033220527,0.00021796153,0.0024152454],"category_scores_gemma":[0.0018682514,0.00014902935,0.00016323854,0.0019832812,0.000118810625,0.00035647463,0.00029531954,0.0004767035,0.0006110173],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017824957,0.00012597271,0.9158858,0.0001105357,0.00013810862,0.00013360888,0.00020795135,0.03096721,0.0009207071,0.0011208621,0.030832725,0.019378306],"study_design_scores_gemma":[0.000010137293,0.000045257406,0.9752406,0.000029441748,0.000033841447,0.00008456777,0.0002603157,0.015232917,0.0010586048,0.00029595607,0.0076899445,0.00001842709],"about_ca_topic_score_codex":0.110347345,"about_ca_topic_score_gemma":0.21982813,"teacher_disagreement_score":0.110347345,"about_ca_system_score_codex":0.0008848289,"about_ca_system_score_gemma":0.0004502617,"threshold_uncertainty_score":0.21941006},"labels":[],"label_agreement":null},{"id":"W2953193713","doi":"10.48550/arxiv.1510.08335","title":"A Stochastic Electricity Market Clearing Formulation with Consistent Pricing Properties","year":2015,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Booth University College","funders":"","keywords":"Clearing; Market clearing; Economics; Bounded function; Diversification (marketing strategy); Quantile; Mathematical optimization; Econometrics; Mathematical economics; Microeconomics; Mathematics; Finance","score_opus":0.0487441980514783,"score_gpt":0.15104653881519817,"score_spread":0.10230234076371986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953193713","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013726411,0.00014042016,0.9746001,0.000969102,0.000060694434,0.00004068176,0.00019988434,0.00006570461,0.010197009],"genre_scores_gemma":[0.7953339,0.00037140228,0.19361944,0.00052835315,0.00021180218,0.00020868142,0.00033291843,0.00014390815,0.00924953],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990908,0.00040393788,0.000037675396,0.00017110341,0.0002264129,0.00007015176],"domain_scores_gemma":[0.99823296,0.00091689563,0.00028665943,0.00016617512,0.00030175055,0.000095502444],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018893777,0.00067741337,0.00080422155,0.00032870396,0.00034073685,0.0017397716,0.0011792695,0.0014522397,0.0049433466],"category_scores_gemma":[0.005459249,0.00053073536,0.00057291315,0.0006926704,0.0009640675,0.0018605953,0.0010641904,0.0014994264,0.00047299665],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025535634,0.000031672957,0.00025306235,0.000050362192,0.000019802785,0.00009573631,0.00004358668,0.5764075,0.00084536604,0.4149172,0.0020967326,0.0052134595],"study_design_scores_gemma":[0.000016494203,0.000020776748,0.00007016681,0.000006640407,0.000004359801,0.00003235543,0.000008763507,0.90037245,0.00014028058,0.09784585,0.0014745945,0.0000072645234],"about_ca_topic_score_codex":0.0014996978,"about_ca_topic_score_gemma":0.0019172991,"teacher_disagreement_score":0.0049433466,"about_ca_system_score_codex":0.0010436509,"about_ca_system_score_gemma":0.0013439142,"threshold_uncertainty_score":0.01653713},"labels":[],"label_agreement":null},{"id":"W2955540607","doi":"10.1109/tpwrs.2019.2926410","title":"Short-Circuit Constrained Power System Expansion Planning Considering Bundling and Voltage Levels of Lines","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Linearization; Electric power transmission; Electric power system; Time horizon; Voltage; Mathematical optimization; Transmission line; Control theory (sociology); Representation (politics); Integer (computer science); Engineering; Nonlinear system; Integer programming; Power (physics); Computer science; Electrical engineering; Mathematics; Control (management)","score_opus":0.018735337284884603,"score_gpt":0.21952922202782985,"score_spread":0.20079388474294524,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955540607","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07039514,0.00024020176,0.9126914,0.00030001547,0.000024078485,0.00008824326,0.00021539163,0.00018095518,0.015864605],"genre_scores_gemma":[0.9463772,0.00019952982,0.04751512,0.000050218106,0.000013929167,0.00010462559,0.00015591783,0.000037418282,0.0055461065],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996518,0.0001533566,0.000011252409,0.000058401874,0.00007231835,0.000052881893],"domain_scores_gemma":[0.99952173,0.00027540725,0.0000792416,0.000019824387,0.00007558907,0.000028305274],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048349405,0.0007216109,0.00055199227,0.00028844882,0.0003089887,0.00089274737,0.0006684159,0.00058239774,0.0027110325],"category_scores_gemma":[0.0011332019,0.0004940383,0.00041733365,0.00060879963,0.00044576623,0.0012546972,0.0006276446,0.00090830016,0.0002184944],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013606108,0.000007093686,0.00007765214,0.000012941702,0.0000036224023,0.000030194333,0.000011017617,0.9928774,0.00028749972,0.0033760176,0.00015731195,0.003145666],"study_design_scores_gemma":[0.0000027079582,0.000014846024,0.00004273451,0.0000028995603,0.000002652663,0.0000057612697,0.0000071057148,0.99748296,0.00016680687,0.0020839635,0.00018522496,0.0000023838488],"about_ca_topic_score_codex":0.009892747,"about_ca_topic_score_gemma":0.011228789,"teacher_disagreement_score":0.009892747,"about_ca_system_score_codex":0.00081299467,"about_ca_system_score_gemma":0.0013903778,"threshold_uncertainty_score":0.019670367},"labels":[],"label_agreement":null},{"id":"W2955874576","doi":"10.1016/j.enpol.2019.05.041","title":"The profitability of onshore wind and solar PV power projects in China - A comparative study","year":2019,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":61,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Institute of Aging; National Natural Science Foundation of China; National Key Research and Development Program of China; National Development and Reform Commission; Florida Institute of Technology; University of San Diego","keywords":"Renewable energy; Cost of electricity by source; Profitability index; Revenue; Wind power; Carbon price; Natural resource economics; Feed-in tariff; Business; Environmental economics; Economics; Electricity generation; Environmental science; Greenhouse gas; Finance; Energy policy; Power (physics); Engineering","score_opus":0.007529807654059703,"score_gpt":0.23836249990346092,"score_spread":0.23083269224940123,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955874576","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9976279,0.00022699762,0.00004817532,0.00006574589,0.0000015256621,0.000002779154,0.0000882786,0.0000028070963,0.0019358017],"genre_scores_gemma":[0.99927896,0.00014066255,0.00001541483,0.0000064947426,0.0000017449815,0.0000011366046,0.00007012095,6.1404694e-7,0.00048481955],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99948573,0.00009899131,0.000023779563,0.000046999685,0.00011634575,0.00022808084],"domain_scores_gemma":[0.99906737,0.00023811933,0.00024643695,0.0000422468,0.00019908635,0.00020669805],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006475062,0.00028029995,0.0003828211,0.0014254866,0.0005996419,0.001613621,0.00042955758,0.0004917296,0.0013177609],"category_scores_gemma":[0.0008685018,0.0002390825,0.00051013124,0.0024869815,0.00074384,0.0009550375,0.0005319169,0.000289594,0.000105054445],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013576457,0.00037092017,0.87994635,0.00022565603,0.00039324252,0.0018843921,0.0009104152,0.053233705,0.007083224,0.012914853,0.0015141474,0.04016536],"study_design_scores_gemma":[0.000035349574,0.00032056138,0.98039746,0.000020913236,0.00011916644,0.00018184338,0.0015111137,0.013474404,0.0009263882,0.00095115573,0.002036698,0.000024779816],"about_ca_topic_score_codex":0.069976725,"about_ca_topic_score_gemma":0.12702353,"teacher_disagreement_score":0.069976725,"about_ca_system_score_codex":0.004512354,"about_ca_system_score_gemma":0.002624677,"threshold_uncertainty_score":0.13913882},"labels":[],"label_agreement":null},{"id":"W2956905953","doi":"10.1016/j.enpol.2019.06.046","title":"Potential benefits of optimal intra-day electricity hedging for the environment: The perspective of electricity retailers","year":2019,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Electricity; Electricity market; Volatility (finance); Business; Electricity retailing; Context (archaeology); Electricity generation; Efficient energy use; Environmental economics; Industrial organization; Natural resource economics; Economics; Finance; Power (physics); Engineering","score_opus":0.004252350394112601,"score_gpt":0.18977301869092622,"score_spread":0.18552066829681363,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956905953","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.65680254,0.005486722,0.07979327,0.030425593,0.0007036549,0.00014747701,0.0010358695,0.0002016987,0.2254031],"genre_scores_gemma":[0.9949222,0.0003925903,0.0013779805,0.00020973502,0.000047439436,0.000007717379,0.000032002783,0.00001545642,0.00299483],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9989692,0.0004991388,0.000025930229,0.00012808142,0.00012149575,0.00025620474],"domain_scores_gemma":[0.9979894,0.0011984514,0.00014832152,0.00015444972,0.00027635318,0.00023298583],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018703956,0.0006789105,0.0012287233,0.00039329578,0.0007944885,0.0044992403,0.0015639404,0.0038348034,0.0081351865],"category_scores_gemma":[0.0056403945,0.0006967377,0.0006499057,0.0007720749,0.0017041488,0.0040855817,0.0016155844,0.0022649288,0.00030453026],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011670165,0.00055182393,0.0056957533,0.0002992812,0.00020342755,0.000618043,0.00024906418,0.62469864,0.002812015,0.3223905,0.005775482,0.035539072],"study_design_scores_gemma":[0.00016149679,0.00052967103,0.008092759,0.00014917491,0.00018700575,0.0002611396,0.0025335103,0.49216467,0.0021444897,0.48100618,0.012634765,0.00013514308],"about_ca_topic_score_codex":0.0056388094,"about_ca_topic_score_gemma":0.008796059,"teacher_disagreement_score":0.0081351865,"about_ca_system_score_codex":0.0024636034,"about_ca_system_score_gemma":0.002897442,"threshold_uncertainty_score":0.027214944},"labels":[],"label_agreement":null},{"id":"W2959167103","doi":"","title":"Transition to a Capacity Auction: a Case Study of Ireland","year":2019,"lang":"en","type":"article","venue":"Arrow@dit (Dublin Institute of Technology)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Order (exchange); Electricity; Investment (military); Revenue; Economics; Marginal cost; Electricity market; Quarter (Canadian coin); Microeconomics; Market economy; Business; Finance","score_opus":0.009406681291129591,"score_gpt":0.2076801616621799,"score_spread":0.1982734803710503,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2959167103","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86701757,0.00072590733,0.0071742088,0.0031574708,0.00010261522,0.00042270994,0.00083339785,0.00016188767,0.120404206],"genre_scores_gemma":[0.9804613,0.00038558425,0.0032573335,0.0003168365,0.000022316788,0.00006932799,0.00043607852,0.00008137864,0.014969836],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"case_report","domain_scores_codex":[0.99808997,0.0006414484,0.00008084381,0.00017539153,0.0002910312,0.0007213059],"domain_scores_gemma":[0.9963366,0.0014118904,0.00036186507,0.00028476358,0.0005485162,0.0010564174],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022844493,0.00047573092,0.00045565394,0.0008065685,0.0024704388,0.0040666386,0.002165118,0.0026103933,0.010833503],"category_scores_gemma":[0.0055624186,0.0003477013,0.0010124013,0.0014754785,0.0022845035,0.0032582579,0.00218449,0.0028757516,0.0018104617],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0044562756,0.008943495,0.15104994,0.0018614383,0.00043383645,0.12472093,0.023788795,0.21320096,0.007485485,0.26287043,0.07726806,0.12392037],"study_design_scores_gemma":[0.0022340387,0.0031637703,0.10207842,0.0009849299,0.00035219372,0.015743876,0.19547689,0.26962107,0.006612926,0.090276696,0.31272516,0.0007299963],"about_ca_topic_score_codex":0.064031206,"about_ca_topic_score_gemma":0.093285754,"teacher_disagreement_score":0.064031206,"about_ca_system_score_codex":0.0051993574,"about_ca_system_score_gemma":0.0033306077,"threshold_uncertainty_score":0.12731701},"labels":[],"label_agreement":null},{"id":"W2963155848","doi":"10.48550/arxiv.1704.02556","title":"Management of Cascading Outage Risk Based on Risk Gradient and Markovian Tree Search","year":2017,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cascading failure; Computer science; Risk management; Electric power system; Convergence (economics); Linearization; Mathematical optimization; Reliability engineering; Tree (set theory); Reduction (mathematics); Power (physics); Engineering; Mathematics; Nonlinear system","score_opus":0.030279163751816652,"score_gpt":0.17191100670057607,"score_spread":0.1416318429487594,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2963155848","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01501746,0.00014298996,0.983188,0.000104900915,0.0000140382635,0.00003630953,0.000013903588,0.00015971244,0.0013227355],"genre_scores_gemma":[0.8184857,0.00021266454,0.17938457,0.00009040941,0.00004073521,0.00014591555,0.00006632066,0.000069060115,0.0015047133],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991929,0.00031817905,0.00004536839,0.00010930805,0.0002464787,0.0000877876],"domain_scores_gemma":[0.9982065,0.0010548057,0.0002452401,0.000082623774,0.00031500173,0.0000958193],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014473674,0.00075566693,0.0011826684,0.00093532295,0.00044456846,0.0007655115,0.0011169806,0.0007115656,0.0013818443],"category_scores_gemma":[0.0047707553,0.00041816736,0.0007352838,0.0006225499,0.00069115474,0.0014893465,0.001227512,0.0010255822,0.00016635351],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003629946,0.000033643977,0.000927859,0.0000380443,0.00003098773,0.000046683763,0.000055807857,0.9548954,0.00082753925,0.013126917,0.00050523784,0.029475464],"study_design_scores_gemma":[0.0000027292197,0.000015210248,0.00007692769,0.0000026747682,0.000003053583,0.00000927959,0.0000037223838,0.9969901,0.00013271418,0.002671754,0.00008837509,0.0000034685547],"about_ca_topic_score_codex":0.005542222,"about_ca_topic_score_gemma":0.0044301697,"teacher_disagreement_score":0.005542222,"about_ca_system_score_codex":0.0009499155,"about_ca_system_score_gemma":0.001982267,"threshold_uncertainty_score":0.011019945},"labels":[],"label_agreement":null},{"id":"W2963427521","doi":"10.1016/j.ejor.2018.10.035","title":"Power transmission network expansion planning: A semidefinite programming branch-and-bound approach","year":2018,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Semidefinite programming; Branch and bound; Mathematical optimization; Integer programming; Node (physics); Computer science; Linear programming relaxation; Relaxation (psychology); Transmission (telecommunications); Tree (set theory); Integer (computer science); Network planning and design; Upper and lower bounds; Search tree; Mathematics; Search algorithm","score_opus":0.047010121484510725,"score_gpt":0.30601575257613706,"score_spread":0.25900563109162633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2963427521","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00488642,0.0003040547,0.9851341,0.00038376122,0.00005601819,0.00007762875,0.00013034236,0.00025375542,0.008773841],"genre_scores_gemma":[0.44173428,0.0011556745,0.5380897,0.0005108573,0.00026486858,0.00086321036,0.0007311743,0.0006821276,0.015968176],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987412,0.0007627326,0.000033342443,0.00012764666,0.00022116827,0.00011391207],"domain_scores_gemma":[0.9966589,0.0025744608,0.00014786494,0.00012169443,0.00035709664,0.0001398788],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030140595,0.0022297006,0.0030332447,0.0010594608,0.0006863729,0.002623031,0.0018909817,0.0020783036,0.008073179],"category_scores_gemma":[0.0058437963,0.0019222604,0.0011693013,0.0017048231,0.0012570723,0.0020226769,0.0015505148,0.003367741,0.0011362864],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042660078,0.00005424813,0.000059753867,0.000050865165,0.000022540777,0.000025645879,0.000018061311,0.9801135,0.00016597426,0.00829592,0.0017057556,0.00944509],"study_design_scores_gemma":[0.000007993473,0.000010249561,0.0000110799865,0.0000065193926,0.0000047693165,0.0000033684971,0.00000321603,0.9961564,0.00006104691,0.0035396703,0.00019353413,0.0000020929301],"about_ca_topic_score_codex":0.0071737296,"about_ca_topic_score_gemma":0.008103919,"teacher_disagreement_score":0.008073179,"about_ca_system_score_codex":0.0012515844,"about_ca_system_score_gemma":0.0025238201,"threshold_uncertainty_score":0.02700746},"labels":[],"label_agreement":null},{"id":"W2965657807","doi":"10.11159/eee19.120","title":"Optimal Operation of GENCOs in Competitive Electricity Markets","year":2019,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Electrical Engineering and Computer Systems and Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Electricity; Computer science; Engineering; Electrical engineering","score_opus":0.0031368940181988355,"score_gpt":0.17655557797109725,"score_spread":0.17341868395289842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2965657807","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6406388,0.00074738316,0.32186785,0.00069625577,0.00009617547,0.00033492947,0.00021457102,0.00028922025,0.035114814],"genre_scores_gemma":[0.9799422,0.00019480595,0.017878626,0.000033850065,0.000009942425,0.00008874187,0.0000276663,0.000022203947,0.0018020764],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99923956,0.00046076046,0.000022821992,0.00007448171,0.000062642655,0.00013973593],"domain_scores_gemma":[0.99913895,0.0004867113,0.00015188043,0.000030926614,0.000102795384,0.000088723056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019431887,0.0010713863,0.0010694396,0.0006355706,0.00086245826,0.002441672,0.00084969564,0.0013977234,0.002397498],"category_scores_gemma":[0.0032407993,0.00079444156,0.00040775325,0.0006485908,0.001289017,0.0013942191,0.0011892364,0.0006683163,0.00025794763],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021133154,0.000044960212,0.0006778613,0.000032238924,0.000020286909,0.00020862518,0.00006486662,0.9760962,0.0009986538,0.01587787,0.00033151772,0.005435628],"study_design_scores_gemma":[0.000023275174,0.000052664484,0.000108069165,0.000004767685,0.000005935613,0.000016270755,0.000057196805,0.992695,0.00020419595,0.0065970886,0.00022977161,0.0000057512925],"about_ca_topic_score_codex":0.0067786514,"about_ca_topic_score_gemma":0.0075029247,"teacher_disagreement_score":0.0067786514,"about_ca_system_score_codex":0.0013806084,"about_ca_system_score_gemma":0.001564969,"threshold_uncertainty_score":0.013478398},"labels":[],"label_agreement":null},{"id":"W2972342334","doi":"10.1109/tpwrs.2019.2940288","title":"A Generic Convex Model for a Chance-Constrained Look-Ahead Economic Dispatch Problem Incorporating an Efficient Wind Power Distribution Modeling","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Wind power; Economic dispatch; Electric power system; Computer science; Linear programming; Cumulative distribution function; Convex optimization; Probability density function; Scheduling (production processes); Piecewise; Integer programming; Power (physics); Mathematics; Regular polygon; Engineering","score_opus":0.011837105205935256,"score_gpt":0.2084447719713819,"score_spread":0.19660766676544664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2972342334","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028971292,0.00014330904,0.9921136,0.00018766952,0.000027792616,0.00003459876,0.00013037503,0.0000680663,0.0043975087],"genre_scores_gemma":[0.7221415,0.0012273001,0.2558288,0.00023932278,0.0001833162,0.00074760447,0.000905222,0.00023377998,0.018493176],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932146,0.00022924745,0.000026827505,0.00012496437,0.00017779252,0.00011983212],"domain_scores_gemma":[0.9991872,0.00046736503,0.00010274536,0.000037739122,0.00014901096,0.000055870205],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012614105,0.0018172538,0.0012723804,0.0006597913,0.0004861678,0.0019265725,0.0015681277,0.0015136366,0.004824966],"category_scores_gemma":[0.0022458644,0.00074254186,0.001229581,0.0009962659,0.000819415,0.001376148,0.0012881592,0.0021949343,0.00078701356],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013000624,0.000009840884,0.000099873025,0.0000321376,0.00000994193,0.000049996535,0.000014241077,0.9733051,0.00024342498,0.021976773,0.00068636524,0.0035592967],"study_design_scores_gemma":[0.0000019377226,0.0000052385813,0.000021520234,0.0000026914931,0.0000018094887,0.0000061631577,0.000002647631,0.9963924,0.00004731353,0.0032187824,0.00029734214,0.0000021080027],"about_ca_topic_score_codex":0.005918033,"about_ca_topic_score_gemma":0.0046389718,"teacher_disagreement_score":0.005918033,"about_ca_system_score_codex":0.0012177305,"about_ca_system_score_gemma":0.0017476211,"threshold_uncertainty_score":0.016141117},"labels":[],"label_agreement":null},{"id":"W2972394739","doi":"10.2139/ssrn.3452741","title":"Pricing Reliability Options Under Different Electricity Prices’ Regimes","year":2019,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Università degli Studi di Padova","keywords":"Electricity; Volatility (finance); Electricity market; Reliability (semiconductor); Remuneration; Electricity price; Economics; Electricity price forecasting; Mean reversion; Econometrics; Value (mathematics); Electricity pricing; Microeconomics; Power (physics); Computer science; Engineering; Finance; Electrical engineering","score_opus":0.006936180240424171,"score_gpt":0.21821791337744412,"score_spread":0.21128173313701995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2972394739","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85128254,0.0007347999,0.11004947,0.0033917066,0.00019817386,0.000037415455,0.0002317201,0.00022672347,0.03384738],"genre_scores_gemma":[0.995832,0.00010411425,0.0022353458,0.00003276191,0.00004133712,0.000010767052,0.000027388065,0.000019537783,0.0016967189],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991405,0.00047513208,0.000032258347,0.000076737626,0.00013700957,0.00013840107],"domain_scores_gemma":[0.9943423,0.0044920486,0.00040340394,0.00031666676,0.00026910348,0.00017652681],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002218046,0.0004325414,0.00074585906,0.00060498755,0.00030528926,0.002647437,0.0010922904,0.00238739,0.00681559],"category_scores_gemma":[0.013380658,0.0003804508,0.00073272816,0.0006952878,0.0014656996,0.003849378,0.00068866217,0.0021918037,0.00032851694],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008674907,0.00018490378,0.0015047188,0.00013291271,0.000073019044,0.0006573329,0.00016804722,0.37921214,0.006456639,0.5882194,0.0021543815,0.02036902],"study_design_scores_gemma":[0.00008130439,0.00011986046,0.001617197,0.0000189358,0.000035493587,0.00017831757,0.000087671804,0.7647346,0.0012259083,0.23127122,0.0005922059,0.00003726158],"about_ca_topic_score_codex":0.00046430287,"about_ca_topic_score_gemma":0.00034424584,"teacher_disagreement_score":0.00681559,"about_ca_system_score_codex":0.00079613,"about_ca_system_score_gemma":0.00033045188,"threshold_uncertainty_score":0.022800386},"labels":[],"label_agreement":null},{"id":"W2972415397","doi":"10.2139/ssrn.3538503","title":"Heterogeneous Passthrough from TFP to Wages","year":2020,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University; University of Toronto","funders":"","keywords":"Total factor productivity; Economics; Labour economics; Productivity; Macroeconomics","score_opus":0.006573148604670896,"score_gpt":0.19026379331628368,"score_spread":0.18369064471161278,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2972415397","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31052887,0.003313963,0.34347445,0.014642797,0.0005764126,0.00014124722,0.0028221682,0.001829865,0.32267022],"genre_scores_gemma":[0.9310467,0.0009879395,0.00486344,0.00042297057,0.0002124101,0.000044252913,0.00019649633,0.00020697263,0.0620188],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9988065,0.0003816177,0.00005080594,0.0002669314,0.00017227764,0.00032183953],"domain_scores_gemma":[0.9932289,0.004095989,0.0008606469,0.0008636418,0.0004006355,0.0005501378],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018608184,0.0008199688,0.0017297026,0.0011186177,0.0011389208,0.0044518844,0.0014301812,0.002867659,0.05794356],"category_scores_gemma":[0.015874313,0.0008764184,0.0012329656,0.0017888041,0.0021792701,0.006349352,0.001959478,0.0039940514,0.0028892609],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019632246,0.000101824444,0.0029379423,0.00021187191,0.00009111855,0.0005645824,0.00043955512,0.025623795,0.0008593474,0.91351837,0.01149998,0.043955326],"study_design_scores_gemma":[0.00003975922,0.000068035486,0.0024014218,0.000073040435,0.00003896296,0.0001777626,0.00023777285,0.022265924,0.00054346665,0.9687682,0.0053584706,0.000027291084],"about_ca_topic_score_codex":0.0080799945,"about_ca_topic_score_gemma":0.0041141296,"teacher_disagreement_score":0.05794356,"about_ca_system_score_codex":0.0020511984,"about_ca_system_score_gemma":0.0016475392,"threshold_uncertainty_score":0.1938405},"labels":[],"label_agreement":null},{"id":"W2974254200","doi":"10.1109/access.2019.2942178","title":"Data-Driven Distributionally Robust Chance-Constrained Unit Commitment With Uncertain Wind Power","year":2019,"lang":"en","type":"article","venue":"IEEE Access","topic":"Electric Power System Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Robust optimization; Power system simulation; Mathematical optimization; Computer science; Wind power; Electric power system; Ambiguity; Stochastic programming; Economic dispatch; Stochastic optimization; Optimization problem; Power (physics); Engineering; Mathematics","score_opus":0.03582488586126701,"score_gpt":0.263093604504024,"score_spread":0.22726871864275702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2974254200","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02250736,0.0001760969,0.974163,0.00021047315,0.000037771617,0.00004765972,0.0001413558,0.00014113355,0.0025751472],"genre_scores_gemma":[0.93660235,0.00019108158,0.060715664,0.0000900177,0.000035713125,0.00014544903,0.00027269768,0.000066561384,0.0018804319],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988231,0.000467982,0.00006895089,0.00022827204,0.00028480613,0.00012691811],"domain_scores_gemma":[0.9982102,0.0010592734,0.00031042314,0.00014057753,0.00021463168,0.00006488802],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001648928,0.0010867671,0.0014477486,0.00033357216,0.00037786659,0.0013110776,0.0015286345,0.0009517682,0.0018431287],"category_scores_gemma":[0.0038853458,0.0007613291,0.0008235682,0.0010268918,0.0008013269,0.0014538649,0.0012757551,0.0017990737,0.00023159786],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015389642,0.0000051585675,0.000072683426,0.000014762196,0.000007912615,0.000027464925,0.0000074549225,0.99346864,0.00013772753,0.0036033017,0.00012943908,0.002510105],"study_design_scores_gemma":[0.0000028074332,0.000007965626,0.000021211019,0.0000015368712,0.0000014338104,0.0000039450683,0.0000020340442,0.99835676,0.00008874021,0.001454774,0.000056382247,0.000002364132],"about_ca_topic_score_codex":0.005153865,"about_ca_topic_score_gemma":0.0032367154,"teacher_disagreement_score":0.005153865,"about_ca_system_score_codex":0.00089156243,"about_ca_system_score_gemma":0.0012163862,"threshold_uncertainty_score":0.010247707},"labels":[],"label_agreement":null},{"id":"W2979431759","doi":"10.1109/ccece.2019.8861590","title":"Flexible Robust Unit Commitment Considering Sub-hourly Wind Power Ramp Behaviors","year":2019,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Power system simulation; Wind power; Unit (ring theory); Power (physics); Control theory (sociology); Wind power forecasting; Computer science; Marine engineering; Environmental science; Electric power system; Meteorology; Electrical engineering; Engineering; Physics; Psychology; Artificial intelligence","score_opus":0.013422986931611128,"score_gpt":0.20748410227900074,"score_spread":0.19406111534738962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979431759","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057399992,0.00025254124,0.93611085,0.00015442749,0.000042371805,0.000041750867,0.00014710496,0.00042730913,0.0054237638],"genre_scores_gemma":[0.98383254,0.00009854804,0.014732449,0.000021032834,0.000010812762,0.00003687961,0.00007449864,0.00004409712,0.0011491487],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999496,0.0001835803,0.000025984438,0.00010681199,0.00010542091,0.00008214981],"domain_scores_gemma":[0.9993017,0.000322568,0.00014999132,0.000101175996,0.00009679486,0.00002769564],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008552383,0.0008472368,0.0010308851,0.00023417424,0.0002549928,0.00093817944,0.001036029,0.0006450056,0.0015486637],"category_scores_gemma":[0.002001497,0.00038587872,0.00066147425,0.00053574913,0.00050283567,0.0008710772,0.0005709104,0.0011860937,0.00019886109],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016429138,0.000005080688,0.00009167702,0.000013178478,0.00000874898,0.00003087796,0.000007877902,0.995424,0.000380913,0.0013900662,0.00011731442,0.0025139395],"study_design_scores_gemma":[8.2593095e-7,0.0000051783745,0.000038844064,6.988919e-7,0.0000013322916,0.000003601389,0.0000014874399,0.99952066,0.00007198307,0.000316201,0.00003801513,0.000001262675],"about_ca_topic_score_codex":0.0063841334,"about_ca_topic_score_gemma":0.0034520747,"teacher_disagreement_score":0.0063841334,"about_ca_system_score_codex":0.000515684,"about_ca_system_score_gemma":0.0006024201,"threshold_uncertainty_score":0.012693942},"labels":[],"label_agreement":null},{"id":"W2979913014","doi":"10.1049/iet-gtd.2019.0257","title":"Integrated transmission and storage systems investment planning hosting wind power generation: continuous‐time hybrid stochastic/robust optimisation","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Etobicoke General Hospital","funders":"","keywords":"Investment (military); Computer science; Electric power system; Wind power; Transmission (telecommunications); Mathematical optimization; Power (physics); Engineering; Electrical engineering; Mathematics; Telecommunications","score_opus":0.012240979004186412,"score_gpt":0.19771542143969298,"score_spread":0.18547444243550656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979913014","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023719478,0.00040206374,0.97018886,0.00024349983,0.000052583502,0.000037732538,0.00006612996,0.00014488866,0.0051446566],"genre_scores_gemma":[0.948802,0.00034071432,0.047207702,0.000074317635,0.000056183184,0.00012203694,0.00012838353,0.00004630401,0.0032222394],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992982,0.00026446974,0.00002716836,0.00012978751,0.00018893612,0.00009141295],"domain_scores_gemma":[0.9992447,0.00043027432,0.00014355361,0.000032268545,0.0001083832,0.000040866722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012558958,0.0010425871,0.001085069,0.00043490942,0.00025517886,0.0015492773,0.00095080206,0.0011482041,0.001446248],"category_scores_gemma":[0.0016514709,0.0006441922,0.0010122943,0.00058247463,0.0007165836,0.00081221026,0.0007882148,0.0010309715,0.00017373056],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012911424,0.00000624952,0.00006329562,0.000013311447,0.000015099333,0.00001884228,0.0000050275007,0.9962655,0.00015129539,0.0015864469,0.00007390141,0.0017882796],"study_design_scores_gemma":[0.0000029469234,0.000012632138,0.00003754122,0.0000017091567,0.0000042594634,0.0000036422907,0.0000021473663,0.99929655,0.000062664985,0.00048662652,0.00008711198,0.000002122231],"about_ca_topic_score_codex":0.0065164613,"about_ca_topic_score_gemma":0.004540774,"teacher_disagreement_score":0.0065164613,"about_ca_system_score_codex":0.00079234503,"about_ca_system_score_gemma":0.001251722,"threshold_uncertainty_score":0.0129570365},"labels":[],"label_agreement":null},{"id":"W2984687746","doi":"10.1109/poweri.2014.7117633","title":"Optimization of co-generation system operation","year":2014,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Cogeneration; Integer programming; Linear programming; Mathematical optimization; Computer science; Selection (genetic algorithm); Optimization problem; Electricity generation; Mathematics; Power (physics)","score_opus":0.00669610139861456,"score_gpt":0.18856246924598355,"score_spread":0.18186636784736898,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2984687746","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23880717,0.0014660144,0.71006393,0.00046036867,0.00015639255,0.00015805008,0.00057313975,0.00042998663,0.04788491],"genre_scores_gemma":[0.98147947,0.00025214828,0.012987592,0.000030558178,0.000014228774,0.000054581305,0.00010873272,0.000058750284,0.0050138407],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996618,0.00013752311,0.000008804001,0.00007002917,0.00006573532,0.000056007684],"domain_scores_gemma":[0.99963963,0.00022307939,0.00004191901,0.000021594733,0.00005443686,0.000019337835],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049437134,0.0011215995,0.00078267243,0.00041594516,0.00034308867,0.001581241,0.00047207306,0.00079131394,0.004221653],"category_scores_gemma":[0.001397591,0.00028015167,0.000330165,0.00095154654,0.00038619115,0.0012439785,0.000485753,0.0007057828,0.00047235817],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055420394,0.00002636535,0.00029332098,0.000036924488,0.000017279477,0.000041492603,0.000008897334,0.9860779,0.0013072467,0.002129149,0.00027462663,0.009731306],"study_design_scores_gemma":[0.000009115133,0.0000722823,0.0005251438,0.000005015769,0.000011866614,0.00002645128,0.000016999924,0.995619,0.001235942,0.0017084928,0.0007639012,0.000005759318],"about_ca_topic_score_codex":0.0033661232,"about_ca_topic_score_gemma":0.004277053,"teacher_disagreement_score":0.004221653,"about_ca_system_score_codex":0.00069799053,"about_ca_system_score_gemma":0.0008536031,"threshold_uncertainty_score":0.014122844},"labels":[],"label_agreement":null},{"id":"W2984773493","doi":"10.1109/psce.2006.296345","title":"Power System Security in Market Clearing and Dispatch Mechanisms","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Amec Foster Wheeler (Canada); University of Waterloo","funders":"","keywords":"Bidding; Market clearing; Economic dispatch; Electric power system; Computer science; Clearing; Common value auction; Mathematical optimization; Power (physics); Economics; Microeconomics; Finance","score_opus":0.0013280503003402794,"score_gpt":0.14803801048829016,"score_spread":0.14670996018794988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2984773493","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026850948,0.0008198045,0.9468751,0.0008556085,0.00012718188,0.00018575172,0.00006198539,0.00028512735,0.023938466],"genre_scores_gemma":[0.8347705,0.0009869017,0.15754905,0.00018344056,0.00015997727,0.00029150632,0.00006106734,0.00010593584,0.0058915108],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9963877,0.0017566459,0.00023338119,0.00035428948,0.0009647833,0.00030310577],"domain_scores_gemma":[0.9937784,0.003526359,0.0007485845,0.0012233332,0.0006058873,0.00011744081],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00895559,0.0008474273,0.00087220717,0.0009551547,0.0010885254,0.0037374685,0.0020656844,0.0014946929,0.0055114874],"category_scores_gemma":[0.013839152,0.0005938423,0.0008404756,0.0013058946,0.0033967574,0.00591252,0.0012835517,0.0016419025,0.0005970735],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000531781,0.000030022917,0.00025444556,0.00005930455,0.000022310116,0.0000980254,0.00012676891,0.15772796,0.00072977575,0.8168645,0.0007765374,0.0232571],"study_design_scores_gemma":[0.00014610715,0.00012788457,0.0003007048,0.000080633414,0.000028824497,0.00021524564,0.00008151033,0.36294022,0.002524049,0.61694807,0.016553167,0.00005358665],"about_ca_topic_score_codex":0.0028291913,"about_ca_topic_score_gemma":0.0016935058,"teacher_disagreement_score":0.00895559,"about_ca_system_score_codex":0.0017840721,"about_ca_system_score_gemma":0.0028467944,"threshold_uncertainty_score":0.04736221},"labels":[],"label_agreement":null},{"id":"W2985214757","doi":"10.1109/pes.2006.1709599","title":"The impact of the restructuring of the electric power industry on its workforce","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Workforce; Restructuring; Electric power industry; Presentation (obstetrics); Power (physics); Business; Industrial organization; Telecommunications; Engineering; Electricity; Electrical engineering; Economics; Economic growth; Finance; Physics; Medicine","score_opus":0.0054089223246507525,"score_gpt":0.20661202964091643,"score_spread":0.20120310731626567,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2985214757","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27973112,0.008522771,0.0009167393,0.41735873,0.003447732,0.0000388648,0.0012460533,0.000050635426,0.2886874],"genre_scores_gemma":[0.91265416,0.006756694,0.0003029473,0.023293871,0.0015072232,0.000028061348,0.00041617235,0.000029088167,0.05501168],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9987238,0.00033615754,0.000021567956,0.000060268518,0.00030149237,0.00055673474],"domain_scores_gemma":[0.9955343,0.00075865746,0.00026991058,0.0000677048,0.0013460625,0.0020233972],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020387056,0.00017588907,0.00013236621,0.00038416553,0.0013670458,0.0020344763,0.00053635484,0.0014463974,0.016588682],"category_scores_gemma":[0.0076081627,0.000083967214,0.00021040083,0.00062402023,0.00076775136,0.0012387731,0.0012843565,0.0016261388,0.0014125045],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00066577294,0.000480265,0.072341904,0.00047930787,0.000033324122,0.00096691906,0.0038699857,0.0050738407,0.0019274204,0.11400995,0.47115946,0.32899192],"study_design_scores_gemma":[0.00009200622,0.00048355895,0.25727114,0.0007216884,0.00003519998,0.0003805697,0.021740375,0.002451372,0.0010512653,0.022964314,0.6927506,0.000058011436],"about_ca_topic_score_codex":0.05412761,"about_ca_topic_score_gemma":0.13098706,"teacher_disagreement_score":0.05412761,"about_ca_system_score_codex":0.0047121975,"about_ca_system_score_gemma":0.010153164,"threshold_uncertainty_score":0.10762507},"labels":[],"label_agreement":null},{"id":"W2989123274","doi":"10.1016/j.energy.2019.116438","title":"A new flexible model for generation scheduling in a smart grid","year":2019,"lang":"en","type":"article","venue":"Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Demand response; Integer programming; Smart grid; Distributed generation; Linear programming; Power system simulation; Scheduling (production processes); Computer science; Energy storage; Electric power system; Grid; Latin hypercube sampling; Wind power; Mathematical optimization; Engineering; Renewable energy; Electricity; Power (physics); Electrical engineering; Algorithm; Mathematics","score_opus":0.01301557746754418,"score_gpt":0.20597339674515508,"score_spread":0.1929578192776109,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2989123274","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0142012015,0.0001421509,0.97629696,0.00042578438,0.00011811209,0.000045070396,0.0001907519,0.00022647165,0.008353509],"genre_scores_gemma":[0.81692356,0.00035355263,0.16654807,0.0002459521,0.00014760047,0.00022313741,0.0003311913,0.0002213872,0.015005498],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995877,0.00014211638,0.000016106069,0.00007948382,0.0001105215,0.000064077525],"domain_scores_gemma":[0.99954385,0.00021400626,0.000046905247,0.00006252563,0.0000805792,0.000052092066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00095743674,0.00067351875,0.0011708027,0.000362708,0.00053089624,0.0014090074,0.0020275523,0.0013827098,0.0060881083],"category_scores_gemma":[0.0020472384,0.0005389857,0.0009102373,0.00089324306,0.0007222824,0.0018811068,0.001095477,0.0017008001,0.0005805306],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022006623,0.000011092345,0.000059225986,0.000013692464,0.000008265258,0.00002331838,0.000010694999,0.9827833,0.00024625324,0.012674594,0.0005415849,0.0036058777],"study_design_scores_gemma":[0.000004332669,0.0000034189093,0.000009640814,8.776793e-7,0.0000014708781,0.0000024884293,0.0000011643297,0.997036,0.000022617694,0.002714838,0.00020188137,0.0000013189959],"about_ca_topic_score_codex":0.006629729,"about_ca_topic_score_gemma":0.007338511,"teacher_disagreement_score":0.006629729,"about_ca_system_score_codex":0.0010012483,"about_ca_system_score_gemma":0.0012937142,"threshold_uncertainty_score":0.020366728},"labels":[],"label_agreement":null},{"id":"W2990497803","doi":"10.1049/iet-gtd.2019.0844","title":"Security‐constrained transmission expansion planning using linear sensitivity factors","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"D-Wave Systems (Canada)","funders":"","keywords":"Sensitivity (control systems); Transmission (telecommunications); Computer science; Mathematical optimization; Mathematics; Electronic engineering; Engineering; Telecommunications","score_opus":0.016383761647324614,"score_gpt":0.23622054551385424,"score_spread":0.21983678386652963,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2990497803","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022847673,0.0001955428,0.9673669,0.00014547551,0.00002490754,0.00006489207,0.00014452137,0.00017519822,0.009034964],"genre_scores_gemma":[0.9218659,0.00041068412,0.07213577,0.000061604354,0.000021827844,0.00023496928,0.00018765086,0.000096014766,0.004985558],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959236,0.00018715758,0.000012751704,0.000052491767,0.00010286224,0.00005236267],"domain_scores_gemma":[0.9993494,0.0004883774,0.000058140788,0.000019697127,0.00006675843,0.000017706136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008086521,0.0009351827,0.0006982733,0.000622666,0.00026097003,0.00092226185,0.00048884354,0.0006744087,0.0031349475],"category_scores_gemma":[0.0020082605,0.0006387231,0.0010847362,0.00072320673,0.00059611315,0.0010394917,0.0006966356,0.00094884145,0.0002763757],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000032031203,0.000002309102,0.000027402013,0.00000628547,0.000002750555,0.000008720696,0.00000349664,0.9972927,0.00009964292,0.0015441236,0.00004350338,0.0009658935],"study_design_scores_gemma":[0.000001400658,0.0000043564614,0.000015631425,0.0000021405363,0.0000014355662,0.0000027838732,0.0000016843132,0.9985655,0.0000676638,0.0012378854,0.000097833,0.0000016394899],"about_ca_topic_score_codex":0.009077378,"about_ca_topic_score_gemma":0.004944193,"teacher_disagreement_score":0.009077378,"about_ca_system_score_codex":0.000911633,"about_ca_system_score_gemma":0.0011586237,"threshold_uncertainty_score":0.018049061},"labels":[],"label_agreement":null},{"id":"W2995919834","doi":"10.1016/j.compchemeng.2019.106677","title":"Uncertainty management via online scheduling for optimal short-term operation of cascaded hydropower systems","year":2019,"lang":"en","type":"article","venue":"Computers & Chemical Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hatch (Canada); McMaster University","funders":"Ontario Centres of Excellence","keywords":"Hydropower; Scheduling (production processes); Electricity; Electricity market; Computer science; Electricity generation; Electric power system; Time horizon; Operations research; Power system simulation; Term (time); Mathematical optimization; Engineering; Power (physics); Operations management","score_opus":0.005551236270046807,"score_gpt":0.20207712572114828,"score_spread":0.19652588945110147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2995919834","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31747437,0.00058080466,0.67314094,0.00064128934,0.0002078706,0.0001833544,0.00017789935,0.00038743857,0.007205938],"genre_scores_gemma":[0.9920704,0.00003869388,0.007373389,0.00001631409,0.000020194648,0.000028734343,0.000028795985,0.0000136687095,0.00040978412],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99963653,0.00011591473,0.000017124545,0.000054157845,0.00008050963,0.00009566145],"domain_scores_gemma":[0.9988617,0.00071330427,0.00016723602,0.00003793261,0.00011728757,0.00010267546],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009902144,0.0008467859,0.0012480636,0.00046309043,0.000726777,0.0010549835,0.00088571967,0.0008439067,0.0018355977],"category_scores_gemma":[0.0024318104,0.0006297271,0.00051636284,0.00042411676,0.0006531264,0.00095448067,0.0008924787,0.0010635271,0.00011372392],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007125416,0.00002839056,0.00013022694,0.000016129732,0.000011508989,0.000026319074,0.00001657386,0.993899,0.00050786,0.00077365874,0.00016004308,0.0043589585],"study_design_scores_gemma":[0.000006020876,0.000017815668,0.00005732728,0.0000010381767,0.0000027878148,0.0000016127635,0.0000037831421,0.9992805,0.00011505244,0.00048312318,0.000029242574,0.0000016675768],"about_ca_topic_score_codex":0.0107895285,"about_ca_topic_score_gemma":0.009260105,"teacher_disagreement_score":0.0107895285,"about_ca_system_score_codex":0.0010184811,"about_ca_system_score_gemma":0.0017029956,"threshold_uncertainty_score":0.02145344},"labels":[],"label_agreement":null},{"id":"W2995953263","doi":"","title":"Strategic Reneging in Sequential Imperfect Markets","year":2019,"lang":"en","type":"article","venue":"Munich Personal RePEc Archive (Munich University)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"HEC Montréal; Labex Ecodec; Agence Nationale de la Recherche","keywords":"Procurement; Incentive; Imperfect; Revenue; Electricity; Economics; Microeconomics; Industrial organization; Electricity market; Business; Marketing; Finance; Engineering","score_opus":0.007714837442599651,"score_gpt":0.17724033544815673,"score_spread":0.16952549800555708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2995953263","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87161523,0.0002128407,0.11054967,0.0009503704,0.000045341432,0.00014693734,0.00018161688,0.00021112879,0.016086893],"genre_scores_gemma":[0.994551,0.000060453283,0.0038851835,0.00007080591,0.000008399525,0.00003035101,0.000015511656,0.000011392923,0.0013669227],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99795747,0.0010817522,0.00007677948,0.00028827292,0.00022455944,0.00037114008],"domain_scores_gemma":[0.9836826,0.010112607,0.0038557358,0.0013752055,0.00042882605,0.00054505316],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005564737,0.00076302537,0.0009985784,0.00043503466,0.000705874,0.001756437,0.0014720956,0.0015710479,0.007037846],"category_scores_gemma":[0.01840362,0.0006110598,0.0006362312,0.00046635678,0.0022354012,0.0039269286,0.0013927202,0.0017633203,0.00029878796],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017657143,0.0006933594,0.011318474,0.00026718108,0.00031332287,0.0011146793,0.00079279,0.63827384,0.012397134,0.2983145,0.002026358,0.032722667],"study_design_scores_gemma":[0.00047089567,0.00055446406,0.0036018144,0.000033623128,0.00009491679,0.00015582594,0.00044153986,0.7989916,0.0028965992,0.18898377,0.003677871,0.00009706376],"about_ca_topic_score_codex":0.0063878363,"about_ca_topic_score_gemma":0.0067566405,"teacher_disagreement_score":0.007037846,"about_ca_system_score_codex":0.001998693,"about_ca_system_score_gemma":0.0018519157,"threshold_uncertainty_score":0.029429495},"labels":[],"label_agreement":null},{"id":"W2995962999","doi":"10.1016/j.ijindorg.2020.102676","title":"Analyzing firm behavior in restructured electricity markets: Empirical challenges with a residual demand analysis","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrial Organization","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Residual; Bidding; Monotonic function; Econometrics; Economics; Smoothing; Demand curve; Profit (economics); Electricity; Microeconomics; Electricity market; Ex-ante; Mathematical optimization; Computer science; Mathematics; Algorithm","score_opus":0.02637596045306552,"score_gpt":0.24979887972395506,"score_spread":0.22342291927088953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2995962999","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9717934,0.00027550908,0.022846451,0.0016088545,0.00002209097,0.00005672811,0.0005806219,0.000138859,0.0026774518],"genre_scores_gemma":[0.9941251,0.00010908439,0.0041757002,0.00010363352,0.00003822961,0.000018568686,0.00040692065,0.000021652135,0.0010010428],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99770963,0.0012574152,0.0001220971,0.00037954774,0.0002654481,0.00026572874],"domain_scores_gemma":[0.96958375,0.023059871,0.003236456,0.0026523632,0.0009317492,0.0005358178],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0067896424,0.00058050297,0.001333565,0.00088378834,0.0005613102,0.003050792,0.0043484536,0.0018764033,0.0035699473],"category_scores_gemma":[0.024549857,0.0005946304,0.0012449078,0.0014672427,0.0014871301,0.004179971,0.0012186366,0.0026353511,0.00040435654],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00061203074,0.0015330762,0.1827834,0.00036794794,0.0009307147,0.0008813024,0.0009124868,0.6939555,0.0017524183,0.05212094,0.0046507125,0.059499465],"study_design_scores_gemma":[0.000050763145,0.00021826536,0.034189332,0.00003285508,0.00009748109,0.000081256556,0.0008094201,0.93731916,0.000563073,0.02577829,0.0008213551,0.000038757033],"about_ca_topic_score_codex":0.02748265,"about_ca_topic_score_gemma":0.026316024,"teacher_disagreement_score":0.02748265,"about_ca_system_score_codex":0.00109469,"about_ca_system_score_gemma":0.0014225331,"threshold_uncertainty_score":0.05464536},"labels":[],"label_agreement":null},{"id":"W3003179592","doi":"10.1109/pesgm40551.2019.8973550","title":"Flexibility Management Considering Transmission Limit and Correlation of Wind Power","year":2019,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Flexibility (engineering); Wind power; Electric power system; Computer science; Reliability engineering; Power (physics); Limit (mathematics); Control engineering; Engineering; Electrical engineering; Mathematics; Physics","score_opus":0.005726993336207118,"score_gpt":0.1888986861164314,"score_spread":0.18317169278022427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3003179592","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37403572,0.0006444061,0.61457837,0.00037290936,0.00003889497,0.00003966638,0.00008760387,0.00015239052,0.010050105],"genre_scores_gemma":[0.99743515,0.00007187976,0.0021763337,0.0000072388507,0.000006974406,0.000007440874,0.000010123188,0.000006513068,0.0002782985],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999668,0.000105597035,0.0000151630575,0.000052014097,0.00006389471,0.00009541508],"domain_scores_gemma":[0.99922884,0.00041255917,0.00016671424,0.000044281507,0.000075552,0.00007201052],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00070239994,0.0005506998,0.00062637683,0.00039602493,0.00035655638,0.001094064,0.0004695701,0.00047775387,0.00086226925],"category_scores_gemma":[0.0020364076,0.00028181743,0.00042551936,0.00043963167,0.0006268797,0.0011101993,0.001046621,0.0005716828,0.00009424649],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006144616,0.000013218289,0.0005978925,0.000020338688,0.000024834688,0.00018371292,0.000033725835,0.98207575,0.0016050232,0.007596589,0.00017379034,0.0076136845],"study_design_scores_gemma":[0.0000040931927,0.000028962664,0.00031604385,0.0000044005446,0.000006061301,0.000018145696,0.000015524463,0.99542713,0.00020115446,0.003867093,0.00010569186,0.0000055901983],"about_ca_topic_score_codex":0.002194383,"about_ca_topic_score_gemma":0.0014356361,"teacher_disagreement_score":0.002194383,"about_ca_system_score_codex":0.00048612288,"about_ca_system_score_gemma":0.00044685518,"threshold_uncertainty_score":0.004363239},"labels":[],"label_agreement":null},{"id":"W3003545925","doi":"10.1016/j.ejor.2020.01.044","title":"Strategic offering of a flexible producer in day-ahead and intraday power markets","year":2020,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Profit maximization; Clearance; Profit (economics); Market power; Market clearing; Industrial organization; Competition (biology); Clearing; Electricity market; Imperfect competition; Business; Microeconomics; Economics; Electricity; Finance","score_opus":0.0715432544506043,"score_gpt":0.2978802218438506,"score_spread":0.2263369673932463,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3003545925","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77593803,0.00039089067,0.15635015,0.0031139518,0.00025474365,0.00018241924,0.00018891298,0.00036401986,0.06321689],"genre_scores_gemma":[0.9947936,0.00003916722,0.0026597967,0.000030918,0.000020395926,0.000008119333,0.000014242522,0.000010227225,0.0024234254],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99917465,0.00035390852,0.000026884825,0.00013004451,0.00012756452,0.00018683405],"domain_scores_gemma":[0.99798113,0.00103998,0.00020399428,0.00014153657,0.0001770615,0.00045632434],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024247195,0.0005721759,0.0011226364,0.00043739696,0.0010922244,0.003096732,0.0012434562,0.0030790223,0.009564412],"category_scores_gemma":[0.0049782386,0.00073709094,0.0007222521,0.00052915554,0.000989648,0.0033119773,0.0016738597,0.0017974132,0.0007472385],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.008298079,0.0011628303,0.009395026,0.00043282367,0.0003168808,0.008084569,0.0012204563,0.5752315,0.031403087,0.27931368,0.011167464,0.073973686],"study_design_scores_gemma":[0.00022454087,0.00090074894,0.0017121744,0.000022653961,0.00007475105,0.0006126646,0.0006281153,0.91301227,0.0027071424,0.07592609,0.0040884116,0.000090416],"about_ca_topic_score_codex":0.0007185671,"about_ca_topic_score_gemma":0.0011812882,"teacher_disagreement_score":0.009564412,"about_ca_system_score_codex":0.0006944325,"about_ca_system_score_gemma":0.00097133924,"threshold_uncertainty_score":0.03199613},"labels":[],"label_agreement":null},{"id":"W3004000849","doi":"10.2139/ssrn.3506915","title":"Optimal Cross-Border Electricity Trading","year":2019,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Electricity; Business; Industrial organization; Engineering","score_opus":0.003451076574138459,"score_gpt":0.25267362941101895,"score_spread":0.2492225528368805,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3004000849","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5319029,0.0014574581,0.35750702,0.002403552,0.00042527416,0.00021207702,0.0006038626,0.0005023176,0.10498559],"genre_scores_gemma":[0.9857324,0.00010298906,0.007500525,0.00006373586,0.000025619142,0.00003021737,0.00006330056,0.000031748878,0.006449586],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956125,0.00020101828,0.0000158708,0.000081486694,0.000038208367,0.000102159465],"domain_scores_gemma":[0.99864155,0.0009044177,0.0000916036,0.00008292097,0.000117273245,0.00016226346],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012268856,0.00083139236,0.0016779437,0.0005068953,0.000478601,0.0022863084,0.00093089027,0.0018101481,0.011501435],"category_scores_gemma":[0.0049063927,0.0006758799,0.00042581416,0.00049133884,0.0009523247,0.0023899386,0.0015631329,0.0013494928,0.00062611274],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010242368,0.00022373178,0.0008641721,0.00009783108,0.00007422047,0.00021122667,0.000043754517,0.9385956,0.0013536781,0.036901552,0.0036730468,0.016936969],"study_design_scores_gemma":[0.00010167464,0.0001464077,0.00034974914,0.000016077216,0.000020302527,0.000031910673,0.000056659148,0.9768058,0.00039623457,0.02153061,0.0005331512,0.000011360005],"about_ca_topic_score_codex":0.0027484675,"about_ca_topic_score_gemma":0.0022320154,"teacher_disagreement_score":0.011501435,"about_ca_system_score_codex":0.0008132965,"about_ca_system_score_gemma":0.0012950476,"threshold_uncertainty_score":0.03847611},"labels":[],"label_agreement":null},{"id":"W3007584316","doi":"10.1016/j.enpol.2020.111348","title":"Reforming the electric power industry in developing economies evidence on efficiency and electricity access outcomes","year":2020,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Institute of Aging","keywords":"Endogeneity; Electricity; Mains electricity; Exploit; Electric power industry; Robustness (evolution); Per capita; Economics; Developing country; Business; Electric power; Consumption (sociology); Industrial organization; Power (physics); Economic growth; Engineering; Population; Econometrics","score_opus":0.02571440024876655,"score_gpt":0.2671849704988075,"score_spread":0.24147057025004096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3007584316","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90804756,0.0039512473,0.0016491241,0.01920609,0.00007763053,0.000055140605,0.0008662422,0.00003164569,0.066115364],"genre_scores_gemma":[0.9961636,0.0009660074,0.00007137805,0.00038356124,0.00005663834,0.000008362023,0.000140038,0.0000035762305,0.0022069027],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99815243,0.0009155669,0.00008429817,0.00010362565,0.00027556004,0.0004684815],"domain_scores_gemma":[0.9830656,0.010590607,0.0035494226,0.0007484468,0.0012802266,0.0007657198],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040841694,0.00025446797,0.0005858838,0.00093240815,0.00050609704,0.0028017836,0.0004898485,0.0009653976,0.0076240483],"category_scores_gemma":[0.0170606,0.00013363875,0.0004023684,0.001735597,0.0021103013,0.0021227803,0.0010867651,0.0019835522,0.00040636945],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00451701,0.0030437785,0.31826314,0.0012054925,0.0008684345,0.00060081965,0.001464684,0.08206195,0.0020135047,0.47285524,0.013304088,0.099801846],"study_design_scores_gemma":[0.0010681122,0.0013465773,0.74990547,0.0006228135,0.001124198,0.00016554348,0.0049336404,0.01438325,0.006493431,0.17519306,0.044677876,0.0000859883],"about_ca_topic_score_codex":0.012331476,"about_ca_topic_score_gemma":0.012350488,"teacher_disagreement_score":0.012331476,"about_ca_system_score_codex":0.0020661415,"about_ca_system_score_gemma":0.0029418797,"threshold_uncertainty_score":0.025505006},"labels":[],"label_agreement":null},{"id":"W3008095092","doi":"10.1109/naps46351.2019.9000207","title":"Energy and Reserve Dispatch with Renewable Generation Using Data-Driven Distributionally Robust Optimization","year":2019,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Mathematical optimization; CVAR; Wind power; Ambiguity; Electric power system; Computer science; Robust optimization; Economic dispatch; Renewable energy; Stochastic programming; Stochastic optimization; Expected shortfall; Power (physics); Risk management; Engineering; Mathematics; Economics","score_opus":0.023342768400795928,"score_gpt":0.20378977506832896,"score_spread":0.18044700666753302,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3008095092","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029795935,0.00022170386,0.9675694,0.00027897567,0.00004271459,0.00005805368,0.000098132645,0.00012484562,0.0018102666],"genre_scores_gemma":[0.9312213,0.0001679126,0.06579189,0.0000911679,0.000055954933,0.00014773378,0.0002020649,0.000070333976,0.0022517208],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998401,0.00068605307,0.00008835072,0.0003064809,0.0003374642,0.00018076392],"domain_scores_gemma":[0.9975381,0.0014633752,0.000430259,0.00012875903,0.00032744958,0.00011210743],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029753142,0.0014020851,0.0021801807,0.00061926676,0.0003229238,0.0017078137,0.001303276,0.0011555441,0.0013953906],"category_scores_gemma":[0.00505979,0.0010330294,0.0013742776,0.0007938713,0.000994036,0.001884172,0.0015346294,0.0017700612,0.00021294216],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023502262,0.000012606601,0.000087201406,0.000016989874,0.000015145155,0.000029172428,0.000008230501,0.99421376,0.00017582759,0.0033202947,0.00009675348,0.002000534],"study_design_scores_gemma":[0.0000045205375,0.000010578947,0.00001856224,9.945724e-7,0.0000015557602,0.0000025268068,0.000001699809,0.9986357,0.000060490813,0.0012282764,0.000032706404,0.0000023833647],"about_ca_topic_score_codex":0.0036199447,"about_ca_topic_score_gemma":0.0022548684,"teacher_disagreement_score":0.0036199447,"about_ca_system_score_codex":0.0011254873,"about_ca_system_score_gemma":0.0015336244,"threshold_uncertainty_score":0.01573515},"labels":[],"label_agreement":null},{"id":"W3009278159","doi":"10.82308/27997","title":"A comparison of pay-as-bid and marginal pricing in electricity markets /","year":2008,"lang":"en","type":"article","venue":"eScholarship@McGill (McGill)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Economics; Electricity; Electricity pricing; Marginal cost; Microeconomics; Business; Financial economics; Electricity market; Engineering","score_opus":0.013309450498046061,"score_gpt":0.22856604792054316,"score_spread":0.21525659742249711,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3009278159","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5003181,0.0035198347,0.43030238,0.0023228924,0.00037468207,0.00024029434,0.0002751067,0.0002729057,0.062373843],"genre_scores_gemma":[0.9832759,0.00035780092,0.014721382,0.000064938875,0.00005594447,0.000043185006,0.00004786312,0.000032959368,0.0013999657],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9953264,0.0031178652,0.00010179972,0.00025529362,0.000873296,0.0003254014],"domain_scores_gemma":[0.9870083,0.010174733,0.00063185266,0.00095092645,0.00094266067,0.00029157865],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007151021,0.00051389553,0.0010149833,0.0005974515,0.0005369815,0.003130126,0.0015835342,0.001058262,0.004470039],"category_scores_gemma":[0.028324597,0.00030921353,0.0009115531,0.00069122855,0.00132681,0.004508641,0.0011817855,0.0013764866,0.0002456869],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00067896955,0.00024625886,0.0044319155,0.0002389795,0.0001198516,0.00011476448,0.00030513373,0.31243223,0.0014417744,0.6303635,0.0020405008,0.04758604],"study_design_scores_gemma":[0.000057717527,0.00028369194,0.0022790714,0.000035075554,0.00003651882,0.000097877266,0.00017445264,0.91052693,0.00056888716,0.084101535,0.0017989126,0.000039288752],"about_ca_topic_score_codex":0.0025210944,"about_ca_topic_score_gemma":0.0011690063,"teacher_disagreement_score":0.007151021,"about_ca_system_score_codex":0.0016527623,"about_ca_system_score_gemma":0.0013278642,"threshold_uncertainty_score":0.03781867},"labels":[],"label_agreement":null},{"id":"W3013293689","doi":"","title":"Electricity market reforms: Institutional developments, investment dynamics and game modeling","year":2001,"lang":"en","type":"article","venue":"Library and Archives Canada (Government of Canada)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Investment (military); Electricity market; Economics; Electricity; Market economy; Business; Economic system; Political science; Engineering; Politics","score_opus":0.002487589972902998,"score_gpt":0.12316476351237901,"score_spread":0.12067717353947602,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3013293689","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.64698184,0.003434479,0.03967657,0.03852045,0.00013445143,0.00018868083,0.0014480692,0.00020965225,0.26940584],"genre_scores_gemma":[0.9911485,0.00072741,0.000727056,0.00015566949,0.000021061267,0.000017569442,0.00008434459,0.000009723295,0.0071087037],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928623,0.00022868738,0.000022340208,0.0000685788,0.000102330436,0.0002917576],"domain_scores_gemma":[0.9973354,0.0014095061,0.00042442666,0.000121963916,0.00034078315,0.00036797632],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015744413,0.00022650801,0.0006845382,0.0006013933,0.0010964135,0.0050931624,0.0011324853,0.0017748441,0.0076318313],"category_scores_gemma":[0.008936232,0.00038131938,0.00040590006,0.0013699012,0.0023035826,0.0027015796,0.00083355786,0.0022719197,0.00024230398],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012018566,0.00014358669,0.0058999676,0.000058228386,0.000033087545,0.0001706408,0.0003303231,0.1592301,0.00028593204,0.81578034,0.007476367,0.010471249],"study_design_scores_gemma":[0.0001832726,0.00009103571,0.019435273,0.00010305206,0.000093430746,0.00006798683,0.0019351612,0.4795869,0.0006265418,0.45572582,0.04207491,0.000076663484],"about_ca_topic_score_codex":0.3190279,"about_ca_topic_score_gemma":0.43413338,"teacher_disagreement_score":0.3190279,"about_ca_system_score_codex":0.013348464,"about_ca_system_score_gemma":0.009520894,"threshold_uncertainty_score":0.6343419},"labels":[],"label_agreement":null},{"id":"W3015276644","doi":"10.1088/1755-1315/463/1/012041","title":"Price allocation of transmission line usage in open access system using mega volt ampere kilometer and mega volt ampere cost method for integrated Nepal power system","year":2020,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Volt; AC power; Electric power system; Electric power transmission; Transmission (telecommunications); Mega-; Computer science; Cost allocation; Power (physics); Electrical engineering; Engineering; Voltage; Economics","score_opus":0.028802505335274727,"score_gpt":0.26654956269681407,"score_spread":0.23774705736153934,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3015276644","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8618722,0.00045545402,0.11228704,0.00021899196,0.000045392826,0.00013707891,0.00032202087,0.000106091466,0.024555683],"genre_scores_gemma":[0.9873043,0.00007483594,0.010254489,0.00000893216,0.000005694447,0.00004216014,0.00006566215,0.000014790034,0.0022291664],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941933,0.00022840613,0.000026068721,0.000056476172,0.00021792525,0.00005176109],"domain_scores_gemma":[0.9987238,0.00075944513,0.00016513423,0.000051684685,0.00026532973,0.000034573008],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065565726,0.00031101587,0.00034043618,0.0011682843,0.00027465675,0.0010958753,0.00056492287,0.0003494841,0.0036083437],"category_scores_gemma":[0.002547754,0.00023036236,0.00035909025,0.0011656921,0.0002537968,0.00084029103,0.00036085345,0.00041494082,0.00015101788],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031849783,0.00015363024,0.022549469,0.0002529671,0.000113362956,0.0006040748,0.00020128462,0.8913811,0.0064099818,0.012177605,0.0012890026,0.064549014],"study_design_scores_gemma":[0.0000148555,0.0002186623,0.018313544,0.000022292263,0.00004903412,0.00017016873,0.00027743288,0.9741562,0.0025156708,0.002902298,0.001329764,0.00003009787],"about_ca_topic_score_codex":0.005262789,"about_ca_topic_score_gemma":0.006718396,"teacher_disagreement_score":0.005262789,"about_ca_system_score_codex":0.0009521414,"about_ca_system_score_gemma":0.00033952392,"threshold_uncertainty_score":0.012071133},"labels":[],"label_agreement":null},{"id":"W3015489845","doi":"10.3390/pr8040441","title":"A Critical Review of the Modeling and Optimization of Combined Heat and Power Dispatch","year":2020,"lang":"en","type":"review","venue":"Processes","topic":"Electric Power System Optimization","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Metaheuristic; Economic dispatch; Computer science; Parallel metaheuristic; Electric power system; Cogeneration; Mathematical optimization; Field (mathematics); Electricity; Electricity generation; Work (physics); Power (physics); Operations research; Engineering; Artificial intelligence; Mathematics","score_opus":0.019733435007010414,"score_gpt":0.26863825016894904,"score_spread":0.24890481516193863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3015489845","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0002442919,0.98331845,0.009163532,0.0010970582,0.0006966801,0.000012252278,0.0000665651,0.000036866662,0.0053643603],"genre_scores_gemma":[0.002700305,0.99103314,0.0037774693,0.00028344613,0.0008140365,0.000015303749,0.0001082786,0.000018121073,0.0012497967],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.999464,0.00012955454,0.00006727401,0.00009079727,0.0002187018,0.000029670617],"domain_scores_gemma":[0.998769,0.0006947927,0.00011184314,0.0000522063,0.00033673266,0.000035437177],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010615865,0.001447741,0.0013038812,0.0018960753,0.00031784587,0.0013749982,0.00148192,0.0014280315,0.004552028],"category_scores_gemma":[0.002472576,0.00078429736,0.0008807002,0.00503419,0.0005930371,0.0019292937,0.0006039744,0.0018974411,0.0027917896],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039385613,0.00011079876,0.0003611958,0.015984364,0.00016076403,0.000111862406,0.000067203626,0.032560743,0.0007941266,0.057596263,0.0797276,0.81248575],"study_design_scores_gemma":[0.000010187255,0.00008923547,0.00080859737,0.006520142,0.00010477862,0.00035146633,0.000065373795,0.008192441,0.0004938508,0.022757644,0.9605543,0.000051901985],"about_ca_topic_score_codex":0.0037067106,"about_ca_topic_score_gemma":0.003775033,"teacher_disagreement_score":0.004552028,"about_ca_system_score_codex":0.0010860178,"about_ca_system_score_gemma":0.0020292713,"threshold_uncertainty_score":0.015228093},"labels":[],"label_agreement":null},{"id":"W3016277054","doi":"10.2478/rtuect-2020-0012","title":"Assessment of Factors Affecting Onshore Wind Power Deployment in India","year":2020,"lang":"en","type":"article","venue":"Environmental and Climate Technologies","topic":"Electric Power System Optimization","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canada Excellence Research Chairs, Government of Canada; Ministry of New and Renewable Energy India","keywords":"Wind power; Renewable energy; Environmental economics; Tariff; Per capita; Offshore wind power; Business; Environmental science; Economics; Engineering","score_opus":0.005840709040272292,"score_gpt":0.19502816748022872,"score_spread":0.18918745843995644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3016277054","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99578357,0.00006702776,0.00045731178,0.00006353133,0.0000037282007,0.000010144666,0.00037059883,0.0000171388,0.0032270658],"genre_scores_gemma":[0.9994579,0.000061000374,0.000100451834,0.000004017276,0.000002179276,0.0000028194613,0.00016231605,0.0000028886002,0.00020646791],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995523,0.00012315765,0.000032603508,0.000047060046,0.00013748562,0.00010730943],"domain_scores_gemma":[0.99837095,0.0005928519,0.00053168624,0.00006719685,0.00033731072,0.000100157886],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038008578,0.00021464999,0.00015342013,0.0009235528,0.0002748333,0.00093845977,0.00021155895,0.00014402634,0.0008799378],"category_scores_gemma":[0.0010356678,0.00011629534,0.00020065853,0.0016065976,0.00031901375,0.00031120869,0.00036710696,0.0002721803,0.00018876199],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009458943,0.000047270074,0.9636735,0.000073658746,0.00005545956,0.00086553686,0.00053807645,0.015640367,0.0036366966,0.0008228444,0.00059513806,0.0139567675],"study_design_scores_gemma":[8.086807e-7,0.000060604547,0.990502,0.000011253367,0.000018810793,0.00014489565,0.0021747153,0.0050455476,0.00092158176,0.00012771678,0.0009810416,0.00001102359],"about_ca_topic_score_codex":0.019581465,"about_ca_topic_score_gemma":0.029017162,"teacher_disagreement_score":0.019581465,"about_ca_system_score_codex":0.0006859537,"about_ca_system_score_gemma":0.00065925956,"threshold_uncertainty_score":0.038935006},"labels":[],"label_agreement":null},{"id":"W3016992921","doi":"10.3390/app10082859","title":"Multi-Objective Optimal Reactive Power Planning under Load Demand and Wind Power Generation Uncertainties Using ε-Constraint Method","year":2020,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Electric Power System Optimization","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"AC power; Wind power; Probabilistic logic; Electric power system; Control theory (sociology); Mathematical optimization; Computer science; Transformer; Reliability engineering; Voltage; Engineering; Automotive engineering; Power (physics); Control (management); Mathematics; Electrical engineering","score_opus":0.041818703032822875,"score_gpt":0.2819223921312036,"score_spread":0.24010368909838076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3016992921","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014853193,0.00023627549,0.98088694,0.00010434318,0.000021076321,0.000045634177,0.00007924123,0.00013718373,0.0036361306],"genre_scores_gemma":[0.74809515,0.00040126374,0.24807496,0.000102355196,0.000038524904,0.000285003,0.0002373979,0.00014058467,0.002624751],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956125,0.00019850153,0.00001678068,0.000058299764,0.00011429539,0.000050876635],"domain_scores_gemma":[0.99916303,0.0005981984,0.00008055433,0.000024455712,0.00010845645,0.00002525046],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011128951,0.0011014342,0.0010807491,0.00052723667,0.0002801848,0.00078339095,0.0008494581,0.000756873,0.0017457387],"category_scores_gemma":[0.0017449927,0.0005699573,0.00074125046,0.0006836402,0.00038543605,0.00068346394,0.0004982789,0.00085505174,0.00017335544],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001072655,0.0000046561736,0.000040783285,0.000016079393,0.000007308296,0.000014172379,0.0000041407966,0.99626344,0.00015535767,0.0008379919,0.00008087213,0.0025645276],"study_design_scores_gemma":[0.000002505312,0.0000065274403,0.000022915208,0.0000020505995,0.0000016417144,0.000002350728,0.0000014105707,0.99950945,0.00008283386,0.00030215658,0.00006476943,0.0000013578579],"about_ca_topic_score_codex":0.011132586,"about_ca_topic_score_gemma":0.0059671267,"teacher_disagreement_score":0.011132586,"about_ca_system_score_codex":0.00059088867,"about_ca_system_score_gemma":0.0010948178,"threshold_uncertainty_score":0.022135615},"labels":[],"label_agreement":null},{"id":"W3017838192","doi":"10.1109/epec47565.2019.9074783","title":"Novel Highly Precise Power Loss Estimators that Directly Solve Power Balance Equality Constraints","year":2019,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Reactance; Computer science; Susceptance; Power system simulation; Estimator; Control theory (sociology); AC power; Electric power system; Mathematical optimization; Power Balance; Transformer; Reliability engineering; Power (physics); Engineering; Mathematics; Electrical engineering; Electrical impedance; Voltage","score_opus":0.009098134405719483,"score_gpt":0.21621139581584484,"score_spread":0.20711326141012534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3017838192","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0045405934,0.00017177482,0.99407506,0.00003362843,0.000030583924,0.000029104256,0.000049969687,0.0004535411,0.00061575294],"genre_scores_gemma":[0.3117651,0.00052583124,0.6843518,0.00012385155,0.00014289512,0.00025362594,0.00067057926,0.00018688937,0.0019794188],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992324,0.00017491405,0.000057719713,0.00020038281,0.0002829,0.00005156996],"domain_scores_gemma":[0.997781,0.0010387085,0.00048639014,0.00030911295,0.00034544873,0.000039474042],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015095285,0.0014965921,0.0010511251,0.0010508873,0.00023589996,0.0010239839,0.0010950853,0.000857792,0.0013214558],"category_scores_gemma":[0.006957886,0.0005887008,0.0004863173,0.0010240839,0.00036228207,0.002278502,0.00083056564,0.0018232594,0.00069008954],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011980557,0.00024714626,0.0035981627,0.00022580626,0.00014216074,0.00006849257,0.00008276906,0.5860906,0.012464752,0.009126104,0.0041136616,0.38372052],"study_design_scores_gemma":[0.00001673733,0.00003906624,0.00068591937,0.000013112222,0.000010565851,0.00004507733,0.000009317291,0.99220145,0.0034572242,0.0021691332,0.0013421281,0.000010288172],"about_ca_topic_score_codex":0.0009680336,"about_ca_topic_score_gemma":0.0013674665,"teacher_disagreement_score":0.0015095285,"about_ca_system_score_codex":0.00037625176,"about_ca_system_score_gemma":0.00053786073,"threshold_uncertainty_score":0.007983267},"labels":[],"label_agreement":null},{"id":"W3018152892","doi":"10.3390/app10082964","title":"Optimal Scheduling of Large-Scale Wind-Hydro-Thermal Systems with Fixed-Head Short-Term Model","year":2020,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Electric Power System Optimization","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Cuckoo search; Wind power; Computer science; Mathematical optimization; Thermal power station; Environmental science; Engineering; Particle swarm optimization; Mathematics; Algorithm; Waste management","score_opus":0.01632863792989521,"score_gpt":0.2272565440591769,"score_spread":0.2109279061292817,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3018152892","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27935186,0.0012930656,0.7097214,0.00037150402,0.00013363166,0.0002015989,0.00021454465,0.0002816838,0.008430701],"genre_scores_gemma":[0.97491735,0.0002406084,0.022655552,0.000030047764,0.000023857334,0.00010588724,0.00010588774,0.000028035658,0.0018928221],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969316,0.00013217774,0.000013155078,0.000049998165,0.00005664324,0.00005497638],"domain_scores_gemma":[0.99939466,0.00037666428,0.000079553385,0.000017701332,0.00008650679,0.00004490054],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066900067,0.00094023364,0.0008901186,0.00046527447,0.0004216987,0.00063151756,0.00081255165,0.00078744383,0.0015606215],"category_scores_gemma":[0.0012058796,0.0004879769,0.0005324751,0.00057867856,0.0004612623,0.00049020065,0.0003566866,0.0005497149,0.00010783423],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015618023,0.0000070704973,0.000099630095,0.000016738268,0.000007948739,0.000015515247,0.000004094088,0.99757236,0.00019150162,0.00049252744,0.0000856998,0.0014912334],"study_design_scores_gemma":[0.0000043043733,0.000011341302,0.000056226436,0.0000010541722,0.0000019019687,0.000002008366,0.0000027218787,0.9995803,0.000056677534,0.00022998467,0.000052237,0.0000012448223],"about_ca_topic_score_codex":0.018637158,"about_ca_topic_score_gemma":0.014551961,"teacher_disagreement_score":0.018637158,"about_ca_system_score_codex":0.0009229704,"about_ca_system_score_gemma":0.0014566025,"threshold_uncertainty_score":0.03705734},"labels":[],"label_agreement":null},{"id":"W3021436577","doi":"","title":"Uncertainty and Investment in Electricity Generation with an Application to the Case of Hydro-Québec","year":2003,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Restructuring; Investment (military); Competition (biology); Electricity; Linear programming; Process (computing); Electricity generation; Operations research; Duration (music); Economics; Face (sociological concept); Computer science; Mathematical optimization; Engineering; Finance; Mathematics; Power (physics)","score_opus":0.014850639102001548,"score_gpt":0.2596637621116189,"score_spread":0.24481312300961736,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3021436577","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.872269,0.0047126287,0.026090667,0.010005115,0.00009632052,0.00012381347,0.0020560038,0.00016660255,0.08447997],"genre_scores_gemma":[0.99060047,0.0008429583,0.002622335,0.000104014995,0.00002205506,0.000024984056,0.00015768333,0.000015087566,0.0056104395],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99963677,0.00016798735,0.000008449331,0.00003545495,0.000053579,0.00009769504],"domain_scores_gemma":[0.9978237,0.0016410268,0.00010995168,0.000046276753,0.00027313508,0.00010598766],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010629557,0.0006096146,0.00061021006,0.0007889234,0.0014202542,0.0018453626,0.001237516,0.0017943436,0.004308876],"category_scores_gemma":[0.004696952,0.00034045937,0.00061620993,0.0018304695,0.0011358367,0.0009686642,0.00090770103,0.0015614956,0.000111833164],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054925324,0.0000591652,0.0037763363,0.00003778712,0.000030124158,0.00059969444,0.000095896125,0.9517093,0.00013853995,0.036672555,0.0025328097,0.004292977],"study_design_scores_gemma":[0.00003300241,0.000026336544,0.0040234374,0.000023268422,0.00002305399,0.000053770273,0.00033883858,0.9779664,0.00009693605,0.01512522,0.002254598,0.000035141875],"about_ca_topic_score_codex":0.8520521,"about_ca_topic_score_gemma":0.826554,"teacher_disagreement_score":0.1479479,"about_ca_system_score_codex":0.014721516,"about_ca_system_score_gemma":0.0045633665,"threshold_uncertainty_score":0.29763836},"labels":[],"label_agreement":null},{"id":"W3022650078","doi":"10.1109/mper.2002.4311904","title":"Economic Inefficiencies and Cross-Subsidies in an Auction-Based Electricity Pool","year":2002,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Hydro-Québec","funders":"","keywords":"Subsidy; Electricity; Electricity market; Economic dispatch; Computer science; Economics; Mathematical optimization; Microeconomics; Auction algorithm; Power (physics); Auction theory; Revenue equivalence; Common value auction; Electric power system; Mathematics; Engineering","score_opus":0.009481165430636339,"score_gpt":0.22083061395187228,"score_spread":0.21134944852123594,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3022650078","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.58350384,0.00050665764,0.39268497,0.0005668147,0.000030712614,0.00015822207,0.000056882804,0.00020657481,0.02228533],"genre_scores_gemma":[0.97326016,0.00012521504,0.024939978,0.0000364152,0.0000070788374,0.000052314008,0.000016514434,0.00003175875,0.0015306002],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99754924,0.0015185124,0.00007240905,0.00013916471,0.00047365009,0.00024706274],"domain_scores_gemma":[0.9965587,0.0022293238,0.0003208529,0.0005019326,0.0003045955,0.000084477506],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0062359464,0.00034290014,0.00088324945,0.0006338113,0.00067100313,0.0019890452,0.0011600759,0.00087482523,0.0019098867],"category_scores_gemma":[0.013426266,0.00034318792,0.0004746954,0.0009696739,0.0015397598,0.0029069327,0.001386864,0.0007114853,0.0002666291],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005469478,0.00018630574,0.0025002903,0.00008772472,0.000048940845,0.00024501316,0.00019393009,0.722389,0.0020766272,0.22371085,0.00056639715,0.04744806],"study_design_scores_gemma":[0.00016918362,0.00020329312,0.0015821671,0.000019867144,0.000048963044,0.00017717546,0.000089625006,0.91442066,0.002413634,0.07926783,0.0015823715,0.000025125324],"about_ca_topic_score_codex":0.0020284748,"about_ca_topic_score_gemma":0.0017706705,"teacher_disagreement_score":0.0062359464,"about_ca_system_score_codex":0.001420767,"about_ca_system_score_gemma":0.0019207497,"threshold_uncertainty_score":0.03297919},"labels":[],"label_agreement":null},{"id":"W3023095508","doi":"","title":"Power Spot Price Models with negative Prices","year":2010,"lang":"en","type":"preprint","venue":"Munich Personal RePEc Archive (Ludwig Maximilian University of Munich)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Spot contract; Economics; Econometrics; Electricity; Financial economics; Futures contract","score_opus":0.00862246158875217,"score_gpt":0.1751815971876323,"score_spread":0.16655913559888014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3023095508","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07549318,0.00089477655,0.86859363,0.0018362915,0.00027318907,0.00006425922,0.00053268677,0.0002852232,0.052026745],"genre_scores_gemma":[0.924554,0.0007748802,0.0261372,0.00016211854,0.0002054129,0.00013878204,0.0003834099,0.00011809806,0.04752612],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940956,0.00028346223,0.00002487086,0.00009025416,0.00012709839,0.000064690365],"domain_scores_gemma":[0.9990746,0.0005289149,0.0001293357,0.00006815357,0.0001370554,0.00006191124],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013634559,0.0011767329,0.00089576497,0.00042978086,0.00033287803,0.0019133503,0.0014961646,0.0015611263,0.005651772],"category_scores_gemma":[0.0038360187,0.00046890543,0.0010819002,0.00070281175,0.0016524383,0.0020562685,0.0010610041,0.0019227124,0.0009027442],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000399224,0.000033019714,0.0004743998,0.00004865258,0.00002276155,0.00029550635,0.000102822814,0.50699264,0.0006121945,0.48482442,0.002044138,0.004509556],"study_design_scores_gemma":[0.000010726929,0.000016749114,0.000084599276,0.0000045139777,0.0000061713404,0.000040263312,0.000015271798,0.8965495,0.0000820407,0.10191512,0.0012669438,0.00000814763],"about_ca_topic_score_codex":0.002627622,"about_ca_topic_score_gemma":0.0016342726,"teacher_disagreement_score":0.005651772,"about_ca_system_score_codex":0.0007541325,"about_ca_system_score_gemma":0.0006157139,"threshold_uncertainty_score":0.01890707},"labels":[],"label_agreement":null},{"id":"W3023110014","doi":"10.1016/j.engappai.2020.103666","title":"A novel and effective optimization algorithm for global optimization and its engineering applications: Turbulent Flow of Water-based Optimization (TFWO)","year":2020,"lang":"en","type":"article","venue":"Engineering Applications of Artificial Intelligence","topic":"Electric Power System Optimization","field":"Engineering","cited_by":155,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Computer science; Benchmark (surveying); Mathematical optimization; Robustness (evolution); Optimization problem; Engineering optimization; Meta-optimization; Convergence (economics); Global optimization; Algorithm; Continuous optimization; Multi-swarm optimization; Mathematics","score_opus":0.010096605850389384,"score_gpt":0.22195732920951977,"score_spread":0.2118607233591304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3023110014","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034702779,0.00018554727,0.9947878,0.00006960451,0.00007941794,0.000027435955,0.000016960512,0.00011878579,0.0012441583],"genre_scores_gemma":[0.10346606,0.0005186155,0.8908339,0.00013921561,0.0001032597,0.00026226294,0.00012733288,0.00020269936,0.004346648],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99978536,0.000062298815,0.000011877833,0.000036784953,0.000082829,0.000020830188],"domain_scores_gemma":[0.9998048,0.000078694546,0.000020898526,0.000016643082,0.00006182882,0.000017205617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006273572,0.0009255215,0.00092182047,0.0006270652,0.00045584308,0.00071474223,0.0008085669,0.0012697931,0.0018422147],"category_scores_gemma":[0.0012871394,0.00030858157,0.00066704076,0.00081027416,0.0004948048,0.0011959797,0.000995021,0.0010375343,0.00041409422],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013677367,0.0001682934,0.00067611574,0.00027664268,0.00009147362,0.00008273809,0.000084692896,0.66913456,0.017464295,0.06213388,0.005097159,0.24465333],"study_design_scores_gemma":[0.000011580164,0.00003336514,0.00004633011,0.00000503513,0.000005462862,0.00001550014,0.0000039490787,0.9953349,0.00090674195,0.0020543488,0.0015765703,0.000006098164],"about_ca_topic_score_codex":0.0015576347,"about_ca_topic_score_gemma":0.0020089324,"teacher_disagreement_score":0.0018422147,"about_ca_system_score_codex":0.00028051328,"about_ca_system_score_gemma":0.00091900886,"threshold_uncertainty_score":0.0061627626},"labels":[],"label_agreement":null},{"id":"W3025084936","doi":"","title":"Robust Optimal Dispatch of Power Systems with Wind Farm","year":2020,"lang":"pl","type":"article","venue":"Biuletyn Instytutu Techniki Cieplnej","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Economic dispatch; Electric power system; Control theory (sociology); Power (physics); Engineering; Electricity generation; Reliability (semiconductor); Reliability engineering; Computer science; Mathematical optimization; Control (management); Mathematics; Electrical engineering","score_opus":0.014459640926019892,"score_gpt":0.1789045376325704,"score_spread":0.1644448967065505,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3025084936","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04426967,0.00040263782,0.94885844,0.0001879569,0.000069937465,0.00007490012,0.000108299886,0.00024801795,0.0057802238],"genre_scores_gemma":[0.9490911,0.0002255253,0.047904193,0.000026947746,0.00003994814,0.000105139174,0.0001280615,0.00007275488,0.0024063764],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999388,0.00026439893,0.000031580872,0.00010770289,0.00012984822,0.000078509605],"domain_scores_gemma":[0.9995097,0.00026641414,0.000085164305,0.000028377774,0.000074106014,0.000036224385],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011218474,0.0010404013,0.0011423129,0.0004622124,0.0003615449,0.0011525457,0.0006315509,0.00058927,0.0015268495],"category_scores_gemma":[0.0018271914,0.00056246674,0.00054112246,0.00050310366,0.00060987315,0.0008674072,0.0006158741,0.00090346014,0.00023192844],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030288853,0.000008546371,0.000074399424,0.000020229076,0.000013742494,0.000029313827,0.000010304803,0.9911759,0.00032435893,0.0045836917,0.00023370587,0.0034954844],"study_design_scores_gemma":[0.0000032423404,0.0000069546027,0.000020095178,7.770878e-7,0.0000012114227,0.000001357564,0.00000213463,0.9983291,0.000052592484,0.0015014567,0.00007975009,0.0000013900519],"about_ca_topic_score_codex":0.006598934,"about_ca_topic_score_gemma":0.0037585567,"teacher_disagreement_score":0.006598934,"about_ca_system_score_codex":0.0010071045,"about_ca_system_score_gemma":0.00117858,"threshold_uncertainty_score":0.013121009},"labels":[],"label_agreement":null},{"id":"W3030829271","doi":"10.1109/tste.2020.2998408","title":"A Fast Flexibility-Driven Generation Portfolio Planning Method for Sustainable Power Systems","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Group for Research in Decision Analysis","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Dispatchable generation; Variable renewable energy; Flexibility (engineering); Renewable energy; Portfolio; Computer science; Reliability engineering; Electric power system; Exploit; Electricity generation; Variable (mathematics); Mathematical optimization; Industrial engineering; Engineering; Power (physics); Distributed generation; Economics; Electrical engineering","score_opus":0.017486060836571962,"score_gpt":0.24935303497224895,"score_spread":0.23186697413567697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3030829271","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00840342,0.0003425639,0.98834515,0.00019570891,0.000045272132,0.0000511309,0.00012898305,0.00028734474,0.0022005048],"genre_scores_gemma":[0.38477293,0.0005786119,0.6079781,0.00023067584,0.00011546608,0.0004393665,0.0006677469,0.00026268806,0.004954375],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968386,0.00013895641,0.000013589454,0.00004437931,0.00008133233,0.000037944148],"domain_scores_gemma":[0.9991959,0.0005819928,0.00004652203,0.00003308689,0.000102137805,0.000040404047],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013166706,0.00086224865,0.000993617,0.0006027785,0.00034170967,0.00085253135,0.001038638,0.0009695284,0.005375907],"category_scores_gemma":[0.0024421122,0.0006588117,0.00067484425,0.0010656696,0.00036826968,0.00075399963,0.0009580983,0.0012775748,0.00068351184],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033010103,0.000014309066,0.00018019923,0.000028823875,0.000020758167,0.00003539958,0.000012540363,0.96626806,0.0003040214,0.003710794,0.00082411617,0.028567858],"study_design_scores_gemma":[0.0000037872062,0.0000040047134,0.000013447854,0.000002397626,0.000001186025,0.0000031470518,0.0000014059286,0.99849916,0.00003714187,0.0012578836,0.00017523684,0.00000122297],"about_ca_topic_score_codex":0.0051616137,"about_ca_topic_score_gemma":0.0062125633,"teacher_disagreement_score":0.005375907,"about_ca_system_score_codex":0.0005797827,"about_ca_system_score_gemma":0.0012075095,"threshold_uncertainty_score":0.017984152},"labels":[],"label_agreement":null},{"id":"W3031255211","doi":"10.1109/tpwrs.2020.2998490","title":"Participation of Pumped Hydro Storage in Energy and Performance-Based Regulation Markets","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Taif University","keywords":"Market clearing; Linear programming; Energy storage; Profit (economics); Integer programming; Demand response; Clearing; Stochastic programming; Mathematical optimization; Energy management; Computer science; Operations research; Economics; Engineering; Microeconomics; Energy (signal processing); Electricity; Power (physics); Mathematics","score_opus":0.009682630743684615,"score_gpt":0.18894428241055528,"score_spread":0.17926165166687066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3031255211","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6587068,0.00039235145,0.2867932,0.0007684155,0.00007249437,0.0002563115,0.00024123286,0.00012350468,0.052645702],"genre_scores_gemma":[0.9964986,0.000045397723,0.0020538212,0.000015755382,0.0000063340112,0.00002420969,0.000016086917,0.000003833051,0.001335957],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99854565,0.000728464,0.000037887716,0.00019382949,0.0002224539,0.00027174],"domain_scores_gemma":[0.9985801,0.00078459305,0.00025045898,0.00006705817,0.00015151694,0.00016625429],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001595878,0.0006164752,0.00069298834,0.00025231732,0.0005389523,0.0018354675,0.0013018928,0.0009851627,0.0040244577],"category_scores_gemma":[0.0023265912,0.00038970713,0.00064205495,0.00043950323,0.0009045092,0.002796546,0.0013279092,0.00072764914,0.00020981126],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035866423,0.0001999708,0.0038669535,0.00012214952,0.000089451074,0.0010190895,0.00018925346,0.8701357,0.004728741,0.104201555,0.00069399993,0.014394454],"study_design_scores_gemma":[0.000035487556,0.00023867327,0.00087631366,0.000009754918,0.000028168923,0.00011533265,0.0002120661,0.9768499,0.0011522826,0.019280814,0.0011824064,0.000018784835],"about_ca_topic_score_codex":0.0022186032,"about_ca_topic_score_gemma":0.0027426174,"teacher_disagreement_score":0.0040244577,"about_ca_system_score_codex":0.00096236984,"about_ca_system_score_gemma":0.0014732898,"threshold_uncertainty_score":0.0134631395},"labels":[],"label_agreement":null},{"id":"W3035845532","doi":"10.18280/jesa.530217","title":"Comparison of Results of Economic Load Dispatch Using Various Meta-Heuristic Techniques","year":2020,"lang":"fr","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Meta heuristic; Economic dispatch; Heuristic; Computer science; Mathematical optimization; Operations research; Artificial intelligence; Engineering; Mathematics; Algorithm; Electric power system","score_opus":0.04522955140843658,"score_gpt":0.29439704863489347,"score_spread":0.24916749722645687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3035845532","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80694956,0.010193377,0.092601575,0.0011930711,0.0006180364,0.0002573864,0.0015149773,0.0021215382,0.0845505],"genre_scores_gemma":[0.9636283,0.0012960574,0.03139,0.00007336841,0.000042964384,0.000083181396,0.000548156,0.00016662263,0.0027713624],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989587,0.00040558787,0.000078672885,0.00010507043,0.0002990995,0.00015277542],"domain_scores_gemma":[0.99705976,0.0020788752,0.00015739414,0.0002128426,0.00040936592,0.000081779144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018753052,0.0012265262,0.001437695,0.0023577274,0.0007020817,0.0016483542,0.0008766985,0.0012602851,0.002720566],"category_scores_gemma":[0.0036408128,0.00032734734,0.0012247348,0.00209268,0.00035319038,0.0009438306,0.00040061623,0.0006310599,0.00040969087],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000544226,0.00021819494,0.0014860401,0.00046704127,0.00018075424,0.00011993394,0.00008895733,0.9272676,0.0015070089,0.0021111008,0.0020097918,0.06399934],"study_design_scores_gemma":[0.00011321914,0.0003767448,0.002002129,0.00006288729,0.00012603651,0.000054933877,0.00019406834,0.98836875,0.004060626,0.0013221507,0.0032869657,0.000031533837],"about_ca_topic_score_codex":0.0074906317,"about_ca_topic_score_gemma":0.0073041474,"teacher_disagreement_score":0.0074906317,"about_ca_system_score_codex":0.0014299974,"about_ca_system_score_gemma":0.0008680447,"threshold_uncertainty_score":0.014894068},"labels":[],"label_agreement":null},{"id":"W3036163467","doi":"10.1049/iet-rpg.2019.1127","title":"Robust optimisation framework for SCED problem in mixed AC‐HVDC power systems with wind uncertainty","year":2020,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Electric Power System Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electric power system; Wind power; Computer science; Mathematical optimization; Power system simulation; Power (physics); Operations research; Control theory (sociology); Reliability engineering; Electrical engineering; Engineering; Mathematics; Artificial intelligence; Physics","score_opus":0.025973835670583242,"score_gpt":0.20937779849932328,"score_spread":0.18340396282874005,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3036163467","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008895901,0.00071137253,0.98032504,0.00032521985,0.00005545204,0.000057846446,0.00011261904,0.000092427166,0.009424065],"genre_scores_gemma":[0.8808595,0.0012867154,0.10746564,0.0002067509,0.00013677982,0.00042421315,0.00033353508,0.00013238809,0.009154518],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940705,0.00025713208,0.000022657692,0.00009847075,0.0001353751,0.00007940415],"domain_scores_gemma":[0.99936897,0.00038746075,0.0000898431,0.000022862245,0.00009964395,0.000031310017],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013350854,0.0014448584,0.0012843834,0.00062467955,0.000315045,0.0015311736,0.0010221058,0.0013149707,0.003013174],"category_scores_gemma":[0.001869099,0.0005720791,0.0011373303,0.00070722,0.0008506115,0.0007709372,0.0013598521,0.0015044751,0.000295855],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010087354,0.0000065583354,0.00006254962,0.000036129408,0.000016791562,0.00003138187,0.000009277605,0.9912048,0.00018129787,0.006260545,0.00021411612,0.0019665132],"study_design_scores_gemma":[0.000004211315,0.000010058418,0.000031308922,0.000004509923,0.0000030255908,0.000004059289,0.000004169514,0.99790937,0.000039587478,0.001759467,0.00022803103,0.0000021267542],"about_ca_topic_score_codex":0.008268938,"about_ca_topic_score_gemma":0.0044376925,"teacher_disagreement_score":0.008268938,"about_ca_system_score_codex":0.00092993764,"about_ca_system_score_gemma":0.0015247065,"threshold_uncertainty_score":0.016441643},"labels":[],"label_agreement":null},{"id":"W3036981922","doi":"","title":"Developments in Utilities Prices | Bulletin – December Quarter 2010","year":2010,"lang":"en","type":"article","venue":"Philadelphia Museum of Art Bulletin","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Advertising; Business; Geography","score_opus":0.006395618936231091,"score_gpt":0.19170116378317095,"score_spread":0.18530554484693987,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3036981922","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010498547,0.010684688,0.0019519242,0.024838954,0.020906981,0.000060683873,0.017435342,0.001281333,0.91234154],"genre_scores_gemma":[0.03526588,0.0057467017,0.000871485,0.0007998133,0.002026531,0.00002459882,0.007949795,0.00034455245,0.94697064],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99931073,0.000050585346,0.000027945633,0.00006144467,0.00046945162,0.000079766476],"domain_scores_gemma":[0.99942243,0.000050564373,0.000043938842,0.000031446478,0.00038580192,0.00006583301],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000602126,0.0009327733,0.000484597,0.0012476803,0.0008808605,0.0044114245,0.00051665993,0.0011542037,0.111531034],"category_scores_gemma":[0.0021080282,0.00044725873,0.00034009456,0.0023509022,0.000261618,0.0020307011,0.0005103778,0.0025165884,0.047187436],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000069387075,0.000025575662,0.00053755334,0.00002800677,0.0000039345673,0.000025281845,0.000013441282,0.0002315416,0.00010783943,0.0031555314,0.9577774,0.03802445],"study_design_scores_gemma":[0.000011139058,0.000029916378,0.0069985213,0.000039077786,0.000006581339,0.000042393498,0.00006035833,0.0004880782,0.00036582566,0.00089890097,0.9910494,0.000009887292],"about_ca_topic_score_codex":0.026144631,"about_ca_topic_score_gemma":0.079072826,"teacher_disagreement_score":0.111531034,"about_ca_system_score_codex":0.0030281157,"about_ca_system_score_gemma":0.0018675722,"threshold_uncertainty_score":0.3731085},"labels":[],"label_agreement":null},{"id":"W3037752876","doi":"10.3390/electronics9061043","title":"Optimal Power Flow Incorporating FACTS Devices and Stochastic Wind Power Generation Using Krill Herd Algorithm","year":2020,"lang":"en","type":"article","venue":"Electronics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Wind power; Electric power system; Mathematical optimization; Weibull distribution; Minification; Electricity generation; Heuristic; Power (physics); Engineering; Turbine; Computer science; Control theory (sociology); Mathematics; Electrical engineering; Statistics","score_opus":0.0120506185980204,"score_gpt":0.2103611781873465,"score_spread":0.1983105595893261,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3037752876","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035876244,0.0003344724,0.9595654,0.0002223261,0.000031370546,0.00007399764,0.000066171015,0.00013820178,0.0036918654],"genre_scores_gemma":[0.7391134,0.00036064314,0.25638247,0.00015143998,0.000047168556,0.00027481627,0.00018651022,0.000085781,0.0033977558],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997613,0.00010187157,0.0000110230285,0.000036127614,0.000047445938,0.000042344014],"domain_scores_gemma":[0.9993218,0.00048742632,0.000078137295,0.00002332852,0.000061354935,0.000027996894],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010749701,0.00075254706,0.0015883165,0.0008472049,0.00044860053,0.0010226639,0.0010439373,0.0014265636,0.002117053],"category_scores_gemma":[0.0019539292,0.00066637865,0.0008850595,0.0010175146,0.0007043513,0.0012060934,0.0006880705,0.0007871478,0.00019111925],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017282193,0.000010720712,0.00018690809,0.000011462094,0.00001655242,0.000017199898,0.000010254321,0.9917561,0.000109895,0.002847529,0.00018761476,0.004828457],"study_design_scores_gemma":[0.000006060343,0.000010510703,0.000022034437,0.0000020800346,0.0000026669159,0.0000027185981,0.0000024923004,0.99887365,0.000026129235,0.0009890045,0.0000613483,0.0000012933682],"about_ca_topic_score_codex":0.010111059,"about_ca_topic_score_gemma":0.008090308,"teacher_disagreement_score":0.010111059,"about_ca_system_score_codex":0.0009941548,"about_ca_system_score_gemma":0.0016253113,"threshold_uncertainty_score":0.020104408},"labels":[],"label_agreement":null},{"id":"W3039325686","doi":"10.37867/te100102","title":"AN ANALYSIS OF POWER SECTOR REFORMS IN INDIA AND CANADA","year":2018,"lang":"en","type":"article","venue":"Towards Excellence","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Manitoba Hydro","keywords":"Hydroelectricity; Electrification; Hydropower; Nova scotia; Electricity; Rural electrification; Electric power industry; Geography; Economy; Agricultural economics; Engineering; Archaeology; Economics","score_opus":0.0038794035847371585,"score_gpt":0.1967492161279488,"score_spread":0.19286981254321164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3039325686","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7642238,0.005260418,0.00029477797,0.007868268,0.000092399314,0.0001813748,0.011312615,0.00009705118,0.21066934],"genre_scores_gemma":[0.9817218,0.0024895575,0.0001622873,0.0006084134,0.000020572705,0.000027180095,0.003172367,0.000029198914,0.01176861],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9958692,0.00012796896,0.00010777147,0.00018776939,0.0013582461,0.0023489848],"domain_scores_gemma":[0.9941691,0.000538707,0.0006809986,0.00016474698,0.0032195672,0.0012269488],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066889386,0.00033861172,0.0005004969,0.004787225,0.0049451953,0.0067911474,0.0014526283,0.0008960291,0.009129604],"category_scores_gemma":[0.00598156,0.0003615473,0.00079444,0.021614008,0.0018156638,0.0011154792,0.0017009176,0.0020357003,0.00059793686],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00068520044,0.000419068,0.56352717,0.0007494165,0.00039002098,0.0039044246,0.0132744,0.022601947,0.0014605006,0.22950801,0.0600522,0.103427656],"study_design_scores_gemma":[0.00004176451,0.000061800274,0.88248605,0.00024209451,0.0001352574,0.00024362079,0.018557696,0.003589314,0.00044130647,0.0019354451,0.092159204,0.000106368345],"about_ca_topic_score_codex":0.99122906,"about_ca_topic_score_gemma":0.9942781,"teacher_disagreement_score":0.12451242,"about_ca_system_score_codex":0.12451242,"about_ca_system_score_gemma":0.10954913,"threshold_uncertainty_score":0.9034051},"labels":[],"label_agreement":null},{"id":"W3042602291","doi":"","title":"Abstract for Developments in Utilities Prices | Bulletin – December Quarter 2010","year":2010,"lang":"en","type":"article","venue":"Philadelphia Museum of Art Bulletin","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); History","score_opus":0.009558937259255919,"score_gpt":0.21120488759602432,"score_spread":0.2016459503367684,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3042602291","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031712877,0.006838556,0.0019026656,0.021670677,0.034734543,0.00017606221,0.025781319,0.0015155737,0.9042094],"genre_scores_gemma":[0.005788236,0.0021961895,0.0005160408,0.00072671263,0.0024458591,0.00003592498,0.0066172136,0.0002485217,0.9814253],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994418,0.00003589391,0.000026128993,0.000054506545,0.00035775616,0.00008392482],"domain_scores_gemma":[0.99886596,0.00009584439,0.000076069016,0.00006048434,0.000784132,0.000117507625],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000510355,0.0009730226,0.0007116653,0.0019033046,0.00092868827,0.003701046,0.0006346509,0.0011309993,0.3604221],"category_scores_gemma":[0.0019733845,0.00034734563,0.0004612478,0.0022716885,0.00019777306,0.0018919269,0.00058656634,0.002813604,0.17750147],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004057148,0.000016469221,0.00013335726,0.00002252581,0.00000198135,0.000009188164,0.000004400103,0.000070397284,0.000047571313,0.00076840085,0.9793992,0.019485896],"study_design_scores_gemma":[0.000014218355,0.000025539232,0.0028246378,0.000044710676,0.0000054849384,0.000013777355,0.000021028403,0.00019643191,0.0001719751,0.0005688056,0.9961068,0.000006703695],"about_ca_topic_score_codex":0.015780665,"about_ca_topic_score_gemma":0.040504605,"teacher_disagreement_score":0.3604221,"about_ca_system_score_codex":0.0019613395,"about_ca_system_score_gemma":0.0018444615,"threshold_uncertainty_score":0.91228026},"labels":[],"label_agreement":null},{"id":"W3043999073","doi":"10.1007/978-3-030-44484-6_10","title":"Power System Development and Economics","year":2020,"lang":"en","type":"book-chapter","venue":"CIGRE green books","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kinectrics (Canada)","funders":"","keywords":"Power (physics); Economics; Physics; Thermodynamics","score_opus":0.009105242002353202,"score_gpt":0.1515839196401592,"score_spread":0.14247867763780597,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3043999073","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00039358315,0.02016439,0.003383909,0.0028010083,0.0011651972,0.000027081185,0.0001669556,0.00016764597,0.97173023],"genre_scores_gemma":[0.007525412,0.01597736,0.001333761,0.00087004947,0.00038369442,0.000034936587,0.0001423396,0.00014758046,0.973585],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997614,0.000039342543,0.000006816709,0.000039856786,0.00013080795,0.000021711316],"domain_scores_gemma":[0.9998808,0.000026756035,0.000006398487,0.000025439791,0.000049244598,0.000011336957],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025412271,0.0010360146,0.00070464873,0.0011813641,0.0009069372,0.0034676476,0.00056737056,0.0010350054,0.07656241],"category_scores_gemma":[0.00075316255,0.0005696803,0.00026161925,0.002389776,0.0009236878,0.0026883115,0.0011583462,0.0025568742,0.03734682],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001045115,0.000037375466,0.00013842693,0.00015787155,0.0000066517196,0.000046613768,0.00015335825,0.0010999502,0.00022722168,0.20570375,0.5811051,0.21131322],"study_design_scores_gemma":[0.0000022751663,0.0000098066075,0.00023887557,0.00013217879,0.0000028112886,0.0000533071,0.00006896583,0.00034656184,0.000089086,0.04490679,0.9541452,0.0000042222728],"about_ca_topic_score_codex":0.005876175,"about_ca_topic_score_gemma":0.018063784,"teacher_disagreement_score":0.07656241,"about_ca_system_score_codex":0.0018418877,"about_ca_system_score_gemma":0.0016685018,"threshold_uncertainty_score":0.25612676},"labels":[],"label_agreement":null},{"id":"W3084139598","doi":"10.1016/j.ijepes.2020.106419","title":"An optimization model to maximize energy generation in short-term hydropower unit commitment using efficiency points","year":2020,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Rio Tinto (Canada); Group for Research in Decision Analysis; HEC Montréal; Université du Québec à Chicoutimi","funders":"Mitacs","keywords":"Hydropower; Term (time); Mathematical optimization; Turbine; Power system simulation; Integer (computer science); Power (physics); Energy storage; Volume (thermodynamics); Electricity generation; Maximum power principle; Unit (ring theory); Function (biology); Environmental science; Computer science; Mathematics; Engineering; Electric power system; Electrical engineering; Physics; Mechanical engineering","score_opus":0.02913703953905076,"score_gpt":0.2661440574084834,"score_spread":0.23700701786943265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3084139598","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1419974,0.000790614,0.81040764,0.0012755111,0.00018490852,0.00029133144,0.00063857296,0.0004251294,0.043988887],"genre_scores_gemma":[0.9573166,0.000222008,0.030406775,0.000093701216,0.00003679804,0.00021169591,0.00018707343,0.00007573876,0.0114497235],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995702,0.00022646107,0.000013125443,0.000055744596,0.00006998563,0.00006453561],"domain_scores_gemma":[0.999295,0.00050587545,0.000048195805,0.000018164073,0.00008534299,0.00004737372],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011862823,0.00092188636,0.0013981748,0.00053796254,0.0005596904,0.0016818567,0.001325013,0.0020759285,0.005440188],"category_scores_gemma":[0.0021690715,0.0011206287,0.00076662033,0.0008670668,0.0006655453,0.0012254904,0.0008648608,0.0014716667,0.00042544393],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014895457,0.0000071617724,0.00004035978,0.00000946913,0.0000058994897,0.000016947299,0.00000500987,0.9978271,0.00007458092,0.0010019053,0.00013295891,0.00086367654],"study_design_scores_gemma":[0.0000061614587,0.000011149748,0.000032621727,0.0000026036737,0.000003112192,0.0000020949958,0.000004053045,0.9993262,0.000039641414,0.00048325703,0.00008723944,0.0000018446285],"about_ca_topic_score_codex":0.011693627,"about_ca_topic_score_gemma":0.009284499,"teacher_disagreement_score":0.011693627,"about_ca_system_score_codex":0.0012246969,"about_ca_system_score_gemma":0.001506165,"threshold_uncertainty_score":0.023251116},"labels":[],"label_agreement":null},{"id":"W3084981120","doi":"10.1111/jems.12445","title":"Vertical integration and capacity investment in the electricity sector","year":2021,"lang":"en","type":"preprint","venue":"Journal of Economics & Management Strategy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund","keywords":"Vertical integration; Electricity; Incentive; Investment (military); Industrial organization; Welfare; Economics; Economic surplus; Business; Microeconomics; Market economy; Engineering","score_opus":0.02422457649008214,"score_gpt":0.21144823425950765,"score_spread":0.1872236577694255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3084981120","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95133203,0.0010886482,0.011485699,0.0012726767,0.00004140012,0.000029489722,0.00013963936,0.000036010268,0.034574427],"genre_scores_gemma":[0.9986084,0.00010421323,0.00032956412,0.00003921683,0.000010976998,0.0000035210492,0.00001553966,0.0000028353716,0.00088581117],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991485,0.00023100944,0.000030518662,0.00008550261,0.00015451678,0.0003499921],"domain_scores_gemma":[0.99630874,0.0013916044,0.0011264123,0.00013356261,0.00040845785,0.000631212],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012892196,0.0004244462,0.00048482203,0.00054158637,0.00053171715,0.0021361115,0.00048043506,0.0008481478,0.007953404],"category_scores_gemma":[0.0034207953,0.000372599,0.00030091743,0.0009543102,0.0012133955,0.0019797555,0.001629744,0.0011976343,0.0002796841],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010901359,0.00096432876,0.07805697,0.00032436237,0.00028282768,0.0010721592,0.0005119546,0.45706654,0.020527095,0.3748209,0.0035768594,0.061705906],"study_design_scores_gemma":[0.00038943163,0.00073942123,0.10719478,0.00040096015,0.0002488415,0.00040198935,0.001832893,0.42184243,0.0098436205,0.44230878,0.014691807,0.00010515862],"about_ca_topic_score_codex":0.005159643,"about_ca_topic_score_gemma":0.0062315217,"teacher_disagreement_score":0.007953404,"about_ca_system_score_codex":0.0024132025,"about_ca_system_score_gemma":0.0012432407,"threshold_uncertainty_score":0.026606798},"labels":[],"label_agreement":null},{"id":"W3087617280","doi":"10.1016/j.tej.2020.106848","title":"Rising market concentration in Texas’s retail electricity market","year":2020,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Expansive; Competition (biology); Electricity retailing; Retail market; Electricity market; Market concentration; Market power; Electricity; Business; Market economy; Commerce; Market structure; Wholesale market; Industrial organization; Economics; Marketing; Monopoly; Engineering","score_opus":0.010654029213831219,"score_gpt":0.1967203963961414,"score_spread":0.18606636718231018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3087617280","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9639564,0.00020713593,0.00028474323,0.0061620376,0.000049007052,0.0000075296657,0.0001826968,0.00003072146,0.029119745],"genre_scores_gemma":[0.99717355,0.00006423608,0.00005588815,0.00019731327,0.000069626665,0.0000017653359,0.000055431123,0.0000068550044,0.0023752816],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99975556,0.00003801199,0.000007736049,0.000047713376,0.00006280748,0.000088142995],"domain_scores_gemma":[0.9982821,0.0004420046,0.00043871233,0.000059946484,0.00039548124,0.0003817285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047648384,0.000115995295,0.00025185297,0.00086684205,0.0014438027,0.0041319565,0.0005905449,0.00097135303,0.010242031],"category_scores_gemma":[0.0022412594,0.0001716987,0.0002072004,0.0010592847,0.0011946838,0.002320644,0.0011120181,0.0012509753,0.0006217263],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017383728,0.0008660277,0.5403767,0.00013311436,0.00014938929,0.005497895,0.0059340503,0.026335912,0.0070535885,0.21970068,0.1172652,0.07494899],"study_design_scores_gemma":[0.0002370216,0.000534196,0.7670443,0.0001094398,0.00009904937,0.0009166966,0.02662836,0.08876114,0.0041473294,0.03158953,0.0798113,0.000121696816],"about_ca_topic_score_codex":0.024260212,"about_ca_topic_score_gemma":0.054764707,"teacher_disagreement_score":0.024260212,"about_ca_system_score_codex":0.0038758456,"about_ca_system_score_gemma":0.0011343571,"threshold_uncertainty_score":0.04823804},"labels":[],"label_agreement":null},{"id":"W3088725794","doi":"10.1109/tste.2020.3026370","title":"Addressing the Conditional and Correlated Wind Power Forecast Errors in Unit Commitment by Distributionally Robust Optimization","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"National Science Foundation","keywords":"Mathematical optimization; Semidefinite programming; Robust optimization; Covariance matrix; Robustness (evolution); Power system simulation; Wind power; Stochastic programming; Estimator; Ambiguity; Covariance; Mathematics; Integer programming; Optimization problem; Computer science; Electric power system; Algorithm; Power (physics); Statistics; Engineering","score_opus":0.021030977848580493,"score_gpt":0.2130901661902146,"score_spread":0.1920591883416341,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3088725794","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014658699,0.00018443834,0.9835963,0.00024810943,0.000024569345,0.000014904221,0.00004222212,0.000049715574,0.0011810906],"genre_scores_gemma":[0.90565246,0.00046337675,0.091515094,0.00014708348,0.00009670877,0.0000933227,0.0001643353,0.00011201212,0.0017555717],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981579,0.0009816041,0.000065883905,0.00034108208,0.0003039569,0.0001496286],"domain_scores_gemma":[0.99466974,0.003957224,0.00065573107,0.0002861029,0.000346542,0.00008465627],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032543405,0.001067585,0.0013867242,0.00034709208,0.00033145363,0.0011865173,0.0014957073,0.0012072455,0.0013398373],"category_scores_gemma":[0.008866388,0.00068413746,0.00070951454,0.00084495195,0.0010295995,0.0017095731,0.0013119733,0.0020577153,0.00015129101],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001930633,0.000013449742,0.0002567345,0.000032434335,0.000031152584,0.000048665795,0.000016453405,0.9772174,0.00033599164,0.015496032,0.00027119642,0.0062612947],"study_design_scores_gemma":[0.000002038992,0.000011360509,0.000058505364,0.0000033196918,0.0000031454888,0.000008205791,0.0000060873062,0.9948285,0.00015434322,0.0048270547,0.000093648174,0.0000038362336],"about_ca_topic_score_codex":0.0026815773,"about_ca_topic_score_gemma":0.0017732853,"teacher_disagreement_score":0.0032543405,"about_ca_system_score_codex":0.00077735895,"about_ca_system_score_gemma":0.0011381031,"threshold_uncertainty_score":0.017210782},"labels":[],"label_agreement":null},{"id":"W3092464541","doi":"10.5547/01956574.41.si1.dolm","title":"Offer Price Information and the Exercise of Market Power: The Effect of the Publication of the Historical Trading Report on Competition in the Alberta Electricity Market","year":2020,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University; University of Calgary","funders":"","keywords":"Electricity; Competition (biology); Electricity market; Market power; Economics; Electricity price; Business; Agricultural economics; Microeconomics; Engineering","score_opus":0.003044185735312914,"score_gpt":0.16255974847575128,"score_spread":0.15951556274043835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3092464541","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95368797,0.0024989503,0.000713152,0.004745923,0.0002054298,0.000042047046,0.0011034453,0.00007868093,0.036924284],"genre_scores_gemma":[0.995684,0.00047059718,0.000116153285,0.00025155235,0.000103682454,0.0000055071923,0.00042667188,0.00001553167,0.0029262544],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9952254,0.0011056846,0.00017605485,0.0003454671,0.0023654772,0.0007818465],"domain_scores_gemma":[0.9220436,0.049114197,0.018209884,0.0020199341,0.0058636605,0.002748617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0054395255,0.00025436512,0.00055389386,0.0012739428,0.0013021319,0.0062679537,0.0012987321,0.0013465604,0.00641402],"category_scores_gemma":[0.04527161,0.0003065007,0.00067059236,0.002491669,0.0028090163,0.0020168743,0.0011034538,0.0022883834,0.00057691603],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0037247052,0.0013489679,0.85277086,0.00035125387,0.0008145763,0.0021513975,0.0029413016,0.028322412,0.0022224395,0.02229785,0.018178446,0.06487582],"study_design_scores_gemma":[0.00027608933,0.00068447494,0.94580644,0.00012944368,0.00055728096,0.0003218507,0.0038135026,0.021051234,0.0025233976,0.0053729205,0.019255184,0.00020821704],"about_ca_topic_score_codex":0.3633393,"about_ca_topic_score_gemma":0.3692294,"teacher_disagreement_score":0.6366607,"about_ca_system_score_codex":0.008427908,"about_ca_system_score_gemma":0.005731404,"threshold_uncertainty_score":0.7224488},"labels":[],"label_agreement":null},{"id":"W3092695888","doi":"10.1016/j.energy.2020.119092","title":"Risk-constrained stochastic market operation strategies for wind power producers and energy storage systems","year":2020,"lang":"en","type":"article","venue":"Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; Teshmont (Canada)","funders":"","keywords":"Backup; Stochastic programming; Wind power; Profit (economics); Energy storage; Renewable energy; Environmental economics; Electric power system; Computer science; Operations research; Economics; Mathematical optimization; Microeconomics; Reliability engineering; Business; Power (physics); Engineering; Mathematics; Electrical engineering","score_opus":0.005557229378387097,"score_gpt":0.17835800699770482,"score_spread":0.17280077761931772,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3092695888","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26757836,0.0015529257,0.70319796,0.0020623764,0.00014644304,0.00030425013,0.00054248224,0.00033081044,0.024284406],"genre_scores_gemma":[0.9874051,0.0002619045,0.0077759763,0.000058487414,0.000029139128,0.00006166019,0.00006966096,0.000039596573,0.004298514],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918705,0.00044880365,0.00003285787,0.00008765141,0.00011361566,0.000130017],"domain_scores_gemma":[0.99682957,0.0023134016,0.00038210113,0.00006580037,0.00026561893,0.00014355368],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031163918,0.0013522455,0.001737423,0.00057610084,0.0004611533,0.0018406784,0.0014098939,0.0017290439,0.0042635696],"category_scores_gemma":[0.007011158,0.0011806868,0.00077524764,0.00061934703,0.0010340731,0.0021120813,0.0011396349,0.0013496238,0.00033090523],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000113845264,0.000027475355,0.00012908025,0.000043540476,0.000027060922,0.000059134625,0.000021122152,0.98409003,0.0003642343,0.01182264,0.00044457152,0.0028572017],"study_design_scores_gemma":[0.000016571576,0.00003972464,0.00008966842,0.0000058596697,0.000009745105,0.000008435744,0.000012862556,0.9948657,0.00009013191,0.0047505335,0.000105058905,0.0000057592592],"about_ca_topic_score_codex":0.0045515657,"about_ca_topic_score_gemma":0.0043947017,"teacher_disagreement_score":0.0045515657,"about_ca_system_score_codex":0.0013390011,"about_ca_system_score_gemma":0.0012944438,"threshold_uncertainty_score":0.01648128},"labels":[],"label_agreement":null},{"id":"W3097377773","doi":"10.1016/j.segan.2020.100405","title":"A novel simulation-based method for assessment of collusion potential in wholesale electricity markets","year":2020,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University; University of Calgary","funders":"","keywords":"Collusion; Shapley value; Bidding; Oligopoly; Electricity market; Microeconomics; Profit (economics); Economics; Electricity; Incentive compatibility; Core (optical fiber); Allocative efficiency; Computer science; Incentive; Industrial organization; Game theory; Cournot competition","score_opus":0.0062730336050743855,"score_gpt":0.23842696458132207,"score_spread":0.23215393097624767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3097377773","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03129671,0.00010370903,0.9618184,0.000114611765,0.000050237675,0.00009722115,0.00009549414,0.0005220627,0.0059015714],"genre_scores_gemma":[0.7652648,0.00012241215,0.23087598,0.00007215516,0.000046112888,0.00028627,0.00018553922,0.00016484174,0.0029818043],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996106,0.00017652646,0.000015618727,0.00004491851,0.00010965095,0.000042745367],"domain_scores_gemma":[0.99845743,0.0010009098,0.00011986606,0.00010241352,0.00023988365,0.00007957541],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008549914,0.0006332678,0.00083438354,0.00087281613,0.00057045056,0.00097072584,0.0011964388,0.0013820943,0.0037112138],"category_scores_gemma":[0.0033008216,0.00040925722,0.00063141645,0.00078218896,0.0005550862,0.0009849046,0.0009375803,0.0008134201,0.00031602266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046728957,0.000055164866,0.0007137918,0.000030185905,0.00003418627,0.000046368226,0.000030277475,0.97696656,0.0015331359,0.007856137,0.00038621514,0.012301178],"study_design_scores_gemma":[0.0000021784494,0.000003061466,0.000026071917,9.38142e-7,0.0000010564908,0.000003008701,0.0000014205715,0.9992932,0.00006376102,0.0005370812,0.00006682595,0.0000013669649],"about_ca_topic_score_codex":0.0076643946,"about_ca_topic_score_gemma":0.004716133,"teacher_disagreement_score":0.0076643946,"about_ca_system_score_codex":0.000666851,"about_ca_system_score_gemma":0.0011547061,"threshold_uncertainty_score":0.015239537},"labels":[],"label_agreement":null},{"id":"W3109679710","doi":"10.2139/ssrn.3742136","title":"The Economics of the Site C Hydroelectric Project in British Columbia","year":2020,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa; University of Calgary; University of Regina","funders":"","keywords":"Hydroelectricity; Geography; Archaeology; Engineering","score_opus":0.0035723519576882244,"score_gpt":0.16208455191253032,"score_spread":0.1585121999548421,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3109679710","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9587719,0.000725087,0.00019867784,0.003964905,0.000014327673,0.000023317889,0.00093076256,0.000009903461,0.0353611],"genre_scores_gemma":[0.99046624,0.00037332842,0.000037369726,0.000069927584,0.00000287334,0.0000045057604,0.00009338116,0.000003992762,0.008948534],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99937445,0.00014115656,0.000016225444,0.000034986915,0.00012688151,0.00030629418],"domain_scores_gemma":[0.99867105,0.00032325537,0.00015238168,0.000030502559,0.00038773927,0.00043502435],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042289816,0.00019564503,0.0003599641,0.0008587644,0.0015142715,0.0035018758,0.0009241654,0.001027084,0.0052640373],"category_scores_gemma":[0.0029272314,0.0002876,0.0001840069,0.001859053,0.0012632175,0.0008640128,0.0011573954,0.0011467481,0.00021588396],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0025349313,0.00063830253,0.46810803,0.0004893361,0.0004970892,0.009652403,0.0027552706,0.16565809,0.005311108,0.20371386,0.041309107,0.099332556],"study_design_scores_gemma":[0.00024136566,0.0003458914,0.7465646,0.00046629674,0.00028500968,0.0010621436,0.038599867,0.1001037,0.0024819877,0.04396675,0.065672286,0.00021001334],"about_ca_topic_score_codex":0.93747556,"about_ca_topic_score_gemma":0.98103607,"teacher_disagreement_score":0.06252444,"about_ca_system_score_codex":0.030227479,"about_ca_system_score_gemma":0.019101929,"threshold_uncertainty_score":0.21931678},"labels":[],"label_agreement":null},{"id":"W3109768257","doi":"10.1007/s41403-020-00185-9","title":"BMFO-SIG: A Novel Binary Moth Flame Optimizer Algorithm with Sigmoidal Transformation for Combinatorial Unit Commitment and Numerical Optimization Problems","year":2020,"lang":"en","type":"article","venue":"Transactions of Indian National Academy of Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Mathematical optimization; Power system simulation; Computer science; Renewable energy; Heuristics; Wind power; Operating cost; Scheduling (production processes); Electric power system; Power (physics); Engineering; Mathematics; Electrical engineering","score_opus":0.014520848195331348,"score_gpt":0.21305392386328786,"score_spread":0.19853307566795653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3109768257","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010685531,0.00023297915,0.98043996,0.00017781174,0.00013042326,0.000082235354,0.000081780956,0.0022098734,0.005959348],"genre_scores_gemma":[0.1671409,0.0001299989,0.82599413,0.000241701,0.00004900171,0.0002586644,0.0001954245,0.00048037342,0.005509878],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970704,0.00007863465,0.000013623352,0.00003993052,0.00012418532,0.0000366465],"domain_scores_gemma":[0.9996929,0.000113317845,0.000028432176,0.00003899155,0.0000930951,0.000033262713],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064334006,0.00089707825,0.0009551503,0.00060594716,0.0005347423,0.00074674527,0.0019906037,0.001445837,0.0058092205],"category_scores_gemma":[0.0015293319,0.00045635138,0.0006644438,0.0006648562,0.00045954675,0.00085014757,0.0013614654,0.0014408818,0.0015273634],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000456387,0.00017941458,0.0006747983,0.00018991386,0.00009160612,0.00009824978,0.00006179846,0.5785643,0.009640167,0.01380929,0.007882705,0.38835144],"study_design_scores_gemma":[0.000022495056,0.000027700124,0.00004494146,0.000004996006,0.0000033008484,0.0000122487445,0.0000034810946,0.99720323,0.0008332087,0.00086971954,0.0009697779,0.0000050035296],"about_ca_topic_score_codex":0.0049647368,"about_ca_topic_score_gemma":0.0065032556,"teacher_disagreement_score":0.0058092205,"about_ca_system_score_codex":0.0004742886,"about_ca_system_score_gemma":0.0012234837,"threshold_uncertainty_score":0.019433796},"labels":[],"label_agreement":null},{"id":"W3110512617","doi":"10.1109/oajpe.2020.3031526","title":"Energy Storage as a Service: Optimal Pricing for Transmission Congestion Relief","year":2020,"lang":"en","type":"article","venue":"IEEE Open Access Journal of Power and Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Service (business); Business; Transmission (telecommunications); Environmental economics; Computer science; Economics; Marketing; Telecommunications","score_opus":0.021016252107233457,"score_gpt":0.28517359807235537,"score_spread":0.2641573459651219,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3110512617","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09457237,0.00080023234,0.8893788,0.0010008196,0.00012837525,0.00017128087,0.0001738163,0.00018729342,0.013587088],"genre_scores_gemma":[0.9694939,0.00020846794,0.028251007,0.000051767314,0.000031128813,0.00005295614,0.00004152494,0.000023986493,0.0018453012],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993444,0.0003235739,0.00001617197,0.00007049111,0.00016316934,0.00008205812],"domain_scores_gemma":[0.9994282,0.00031814567,0.00007698347,0.000033245095,0.000087538385,0.000055774966],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010107813,0.0007317233,0.0009477255,0.0005116879,0.00034483973,0.0015471154,0.0011914978,0.0011880815,0.0029137793],"category_scores_gemma":[0.0032941864,0.00048577893,0.00061986083,0.0008774453,0.0007805675,0.0017187987,0.0008799814,0.0010347113,0.00014283089],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004478762,0.000026652528,0.0002662947,0.00002626483,0.00001403077,0.000042572992,0.000011341494,0.97653383,0.0004648986,0.01585522,0.00048741425,0.006226649],"study_design_scores_gemma":[0.000004463126,0.000013790978,0.000051694253,0.0000029420628,0.000003208115,0.00000822909,0.000006607317,0.9971289,0.00008720665,0.0025344652,0.00015534025,0.0000031786385],"about_ca_topic_score_codex":0.0064035812,"about_ca_topic_score_gemma":0.005498847,"teacher_disagreement_score":0.0064035812,"about_ca_system_score_codex":0.0015505533,"about_ca_system_score_gemma":0.0018583296,"threshold_uncertainty_score":0.012732625},"labels":[],"label_agreement":null},{"id":"W3113056885","doi":"","title":"An Analysis of the Decline in JEPX Day-Ahead Prices: Some Impacts of RES Supply and the COVID-19-Induced Demand Downturn (Japanese)","year":2020,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Order (exchange); Quarter (Canadian coin); Coronavirus disease 2019 (COVID-19); Economics; Volume (thermodynamics); Database transaction; Monetary economics; Supply and demand; Econometrics; Business; Microeconomics; Geography; Finance","score_opus":0.025002613686728507,"score_gpt":0.30652388271605957,"score_spread":0.28152126902933106,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3113056885","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99754035,0.00008459685,0.0004807103,0.000121681995,0.000008844321,0.0000066170005,0.00097012374,0.000018784165,0.0007684828],"genre_scores_gemma":[0.99703974,0.000060696937,0.00018546957,0.000015607287,0.000011465937,0.000005471436,0.002279163,0.0000066902485,0.0003957947],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9997863,0.000037748177,0.000018785084,0.000054813027,0.000042299707,0.000059944246],"domain_scores_gemma":[0.99856704,0.0005029369,0.0004996888,0.00006910613,0.00023794222,0.00012325456],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007099048,0.00027349315,0.00033647948,0.00088502327,0.0002085438,0.00088648923,0.000336703,0.00058010744,0.0016087252],"category_scores_gemma":[0.0026241876,0.00017595064,0.00056406093,0.0011654056,0.00028164766,0.00061231817,0.00044831706,0.0006210098,0.0002821855],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000528145,0.00021324604,0.95279455,0.00011812298,0.00025060185,0.0011887706,0.00043663583,0.02381507,0.004178455,0.002150794,0.0030432001,0.011282495],"study_design_scores_gemma":[0.000010901939,0.000164506,0.9253077,0.000010752508,0.000061033934,0.00018946663,0.00082217046,0.07081632,0.00090457604,0.00039448153,0.0012901719,0.000027878956],"about_ca_topic_score_codex":0.01208011,"about_ca_topic_score_gemma":0.01233233,"teacher_disagreement_score":0.01208011,"about_ca_system_score_codex":0.00043925593,"about_ca_system_score_gemma":0.00025976333,"threshold_uncertainty_score":0.024019599},"labels":[],"label_agreement":null},{"id":"W3114963346","doi":"10.18280/ijsdp.150814","title":"Optimization of Generation Cost, Environmental Impact, and Reliability of a Microgrid Using Non-dominated Sorting Genetic Algorithm-II","year":2020,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sorting; Microgrid; Reliability (semiconductor); Mathematical optimization; Multi-objective optimization; Pareto principle; Genetic algorithm; Computer science; Evolutionary algorithm; Electricity generation; Reliability engineering; Key (lock); Constraint (computer-aided design); Power (physics); Engineering; Algorithm; Mathematics; Artificial intelligence","score_opus":0.008472030917567576,"score_gpt":0.2226293581729283,"score_spread":0.21415732725536074,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3114963346","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3894781,0.00056035985,0.5937069,0.00046258196,0.00007911634,0.00023692058,0.0001789708,0.00044713586,0.014849849],"genre_scores_gemma":[0.93246603,0.00021068665,0.06413692,0.000060135655,0.000010459403,0.00017958465,0.00010753055,0.00002744042,0.0028011817],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99974734,0.00010566012,0.000008446052,0.000032407086,0.00006114246,0.000045017205],"domain_scores_gemma":[0.9997292,0.00015647382,0.000036837228,0.000009866632,0.00004929328,0.000018302428],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007823771,0.0008733914,0.0007521191,0.0006116771,0.00047505778,0.0009138763,0.0006107748,0.0007836277,0.0011286024],"category_scores_gemma":[0.0010909837,0.00032956025,0.0005643928,0.00065947446,0.00040792237,0.00043413838,0.0004467242,0.00047913712,0.000097313045],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014294629,0.000017368291,0.00019696033,0.000012203359,0.000008418267,0.000015679663,0.000008189752,0.99509084,0.00033341552,0.00044889265,0.0000996538,0.0037539755],"study_design_scores_gemma":[0.0000058737523,0.000022320064,0.00007785841,0.0000021645656,0.0000037670748,0.000003809445,0.000006172381,0.99943405,0.00017695286,0.00019991012,0.00006568351,0.0000014084077],"about_ca_topic_score_codex":0.010372561,"about_ca_topic_score_gemma":0.007717333,"teacher_disagreement_score":0.010372561,"about_ca_system_score_codex":0.0010408072,"about_ca_system_score_gemma":0.0018734658,"threshold_uncertainty_score":0.02062434},"labels":[],"label_agreement":null},{"id":"W3115796903","doi":"10.18280/mmep.070415","title":"Solving Bid-Based Dynamic Economic Dispatch in Competitive Electricity Market Using Improved Simulated Annealing Algorithm","year":2020,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Economic dispatch; Electricity market; Profit maximization; Computer science; Bidding; Electric power system; Electricity; Mathematical optimization; Automatic Generation Control; Profit (economics); Power system simulation; Simulated annealing; Operations research; Economics; Microeconomics; Algorithm; Power (physics); Engineering; Mathematics","score_opus":0.011015173838808968,"score_gpt":0.19307494127631367,"score_spread":0.1820597674375047,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3115796903","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.071989596,0.00025550413,0.9192327,0.00022436747,0.000042967768,0.00009925387,0.00009617034,0.0004121565,0.007647275],"genre_scores_gemma":[0.7419385,0.00016350976,0.2541255,0.00008391531,0.000022799397,0.00029203494,0.00018431328,0.00009863378,0.003090745],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995715,0.00022086673,0.000018019593,0.000055935958,0.00007272653,0.000060997183],"domain_scores_gemma":[0.9990828,0.00063316606,0.00006912547,0.000043294225,0.00013670069,0.000034875717],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00093428715,0.00071519666,0.0014315725,0.0005038069,0.00043583658,0.0008330806,0.0009947494,0.0010818291,0.0022521128],"category_scores_gemma":[0.0018286809,0.00063761283,0.0007717163,0.0006177618,0.00052764337,0.00058317283,0.00057282194,0.00090733566,0.0002595029],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001994045,0.000015182992,0.00012563367,0.000014416979,0.00001198794,0.000011828914,0.000012603587,0.9943212,0.00026244082,0.0013105338,0.0001378456,0.0037563487],"study_design_scores_gemma":[0.0000049891096,0.0000060621733,0.000028410872,7.9935603e-7,0.0000015591162,0.0000017509632,0.0000022188058,0.9995747,0.00004739905,0.00027178146,0.0000595118,9.110634e-7],"about_ca_topic_score_codex":0.01186495,"about_ca_topic_score_gemma":0.009057194,"teacher_disagreement_score":0.01186495,"about_ca_system_score_codex":0.0007175937,"about_ca_system_score_gemma":0.0015751964,"threshold_uncertainty_score":0.023591816},"labels":[],"label_agreement":null},{"id":"W3117343138","doi":"10.22094/joie.2020.1892184.1725","title":"A New Optimization Algorithm for Optimal Wind Turbine Location Problem in Constantine City Electric Distribution Network Based Active Power Loss Reduction","year":2021,"lang":"en","type":"article","venue":"Journal of optimization in industrial engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Sizing; Wind power; Reduction (mathematics); Computer science; Turbine; Renewable energy; Algorithm; Particle swarm optimization; Mathematical optimization; Power (physics); Position (finance); Mathematics; Engineering; Electrical engineering","score_opus":0.009860846173016405,"score_gpt":0.20928720293444042,"score_spread":0.199426356761424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3117343138","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023369836,0.0003400187,0.9693895,0.00021463033,0.000062200095,0.00008179035,0.000056299043,0.00019506193,0.0062906984],"genre_scores_gemma":[0.5447124,0.0005222896,0.44655752,0.00013435374,0.00007118766,0.00045462247,0.00028266487,0.00009607607,0.0071688783],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99982625,0.000052967796,0.000011107885,0.00003652696,0.000049765047,0.000023396055],"domain_scores_gemma":[0.9997485,0.00013082623,0.000032073858,0.000008619663,0.00006855741,0.000011394657],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005345583,0.0007349566,0.0007574138,0.00044610928,0.00037058527,0.00088300975,0.00065057277,0.00090221106,0.001859631],"category_scores_gemma":[0.0008448138,0.0003275,0.000461603,0.00057891855,0.0003581069,0.0005707445,0.00058679725,0.00066929497,0.00029622245],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039752667,0.000026027357,0.00031878395,0.000055983575,0.000018149934,0.00005207023,0.00003596152,0.9624098,0.0010821364,0.002214447,0.00097472465,0.032772228],"study_design_scores_gemma":[0.00000782509,0.000020221138,0.00006394419,0.000004052416,0.000002987506,0.000009844277,0.000007207745,0.9988997,0.00018377883,0.0003682536,0.00043034364,0.0000018050631],"about_ca_topic_score_codex":0.0049367277,"about_ca_topic_score_gemma":0.0043089455,"teacher_disagreement_score":0.0049367277,"about_ca_system_score_codex":0.0005184794,"about_ca_system_score_gemma":0.0009021135,"threshold_uncertainty_score":0.009815991},"labels":[],"label_agreement":null},{"id":"W3118372329","doi":"10.1109/tpwrs.2021.3049742","title":"Self-Scheduling Models of a CAES Facility Under Uncertainties","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Ontario Centres of Excellence","keywords":"Scheduling (production processes); Compressed air energy storage; Mathematical optimization; Computer science; Monte Carlo method; Hedge; Energy storage; Mathematics; Power (physics)","score_opus":0.01421400205930789,"score_gpt":0.20623876848401948,"score_spread":0.19202476642471158,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3118372329","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19545704,0.00026301047,0.77504426,0.00046317768,0.00007310729,0.000110176145,0.00054171594,0.00031323827,0.0277342],"genre_scores_gemma":[0.98583555,0.00011615159,0.008063869,0.000030314868,0.000013732488,0.000063330364,0.00010494063,0.000027509706,0.0057446565],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996569,0.00008781556,0.000015583295,0.00006422212,0.000115173076,0.000060328395],"domain_scores_gemma":[0.9995627,0.00017163147,0.00013291191,0.000027735996,0.000077919685,0.000027162778],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049314764,0.0005152802,0.0005914397,0.00036140223,0.00036115356,0.0010471496,0.0011497199,0.0010543901,0.002746355],"category_scores_gemma":[0.00087339105,0.00032746565,0.0006520598,0.00042795806,0.0007165383,0.000918913,0.0006826606,0.00072263635,0.00027404807],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012137636,0.000004999203,0.00009289388,0.000006825578,0.0000036969366,0.000029376683,0.000012069003,0.99468994,0.00034061447,0.003981226,0.000073383555,0.00075293257],"study_design_scores_gemma":[0.0000022580055,0.00000913699,0.000060939787,0.0000010125639,0.0000018595433,0.00000515528,0.000005448661,0.9989681,0.00011977776,0.0006916399,0.00013237103,0.0000022783756],"about_ca_topic_score_codex":0.010170358,"about_ca_topic_score_gemma":0.0039508184,"teacher_disagreement_score":0.010170358,"about_ca_system_score_codex":0.0010506535,"about_ca_system_score_gemma":0.0008568125,"threshold_uncertainty_score":0.020222366},"labels":[],"label_agreement":null},{"id":"W3121215414","doi":"","title":"Valuing Electricity Transmission: The Case of Alberta","year":2012,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Electricity market; Electricity; Incentive; Transmission (telecommunications); Investment (military); Grid; Electric power transmission; Value (mathematics); Business; Economics; Industrial organization; Electricity price; Microeconomics; Computer science; Engineering; Telecommunications; Geography","score_opus":0.00504165806439924,"score_gpt":0.20606614512381957,"score_spread":0.20102448705942033,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121215414","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89530426,0.0007877861,0.005914967,0.0021677706,0.000022251392,0.00005331218,0.00025750464,0.000029170764,0.09546309],"genre_scores_gemma":[0.9913987,0.00039763813,0.0016555083,0.000045595825,0.000007955456,0.000007260545,0.000069208065,0.000005555694,0.0064126994],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9997212,0.00009128226,0.0000047855447,0.000026494617,0.00007137084,0.00008481771],"domain_scores_gemma":[0.9994562,0.00026607615,0.00004348738,0.000028987524,0.00011072322,0.00009454397],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004895101,0.00035194692,0.00026900633,0.0008473505,0.0019066201,0.0022689493,0.0012434745,0.0012196457,0.0036673849],"category_scores_gemma":[0.0018154035,0.00019369183,0.00035759126,0.00201808,0.0018020527,0.001183078,0.001079952,0.0010050548,0.00011527131],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004940703,0.00033762353,0.04031393,0.00015214742,0.00010860178,0.0057324716,0.0017570552,0.5574796,0.0022970648,0.3459912,0.00708579,0.038250357],"study_design_scores_gemma":[0.00023611561,0.00017712866,0.038492005,0.00016079741,0.00013958389,0.0009206415,0.012668399,0.7379416,0.0012927318,0.17877279,0.029042348,0.00015589835],"about_ca_topic_score_codex":0.74321437,"about_ca_topic_score_gemma":0.86141515,"teacher_disagreement_score":0.25678563,"about_ca_system_score_codex":0.014235576,"about_ca_system_score_gemma":0.0047684447,"threshold_uncertainty_score":0.5165957},"labels":[],"label_agreement":null},{"id":"W3121448139","doi":"10.2139/ssrn.3477249","title":"Analyzing Firm Behaviour in Restructured Electricity Markets: Empirical Challenges with a Residual Demand Analysis","year":2019,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Bidding; Residual; Microeconomics; Electricity; Economics; Profit (economics); Monotonic function; Econometrics; Demand curve; Procurement; Industrial organization; Empirical research; Common value auction; Computer science; Mathematics","score_opus":0.009567977826831355,"score_gpt":0.24104196367644376,"score_spread":0.2314739858496124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121448139","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95893806,0.00039294705,0.034941293,0.0016556924,0.000024655761,0.000050038816,0.0006729367,0.00017435873,0.0031500063],"genre_scores_gemma":[0.9924366,0.00015694262,0.005264021,0.00010614824,0.000047191395,0.000020043588,0.0005369078,0.000037582373,0.0013945481],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9979165,0.0010697787,0.00012242746,0.00037799447,0.00026445088,0.00024881863],"domain_scores_gemma":[0.96931577,0.023313535,0.0031183823,0.0028463332,0.00089331093,0.00051260873],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005862845,0.0005598029,0.0015153497,0.0008739787,0.00046984525,0.0028300835,0.004127628,0.002032507,0.00407547],"category_scores_gemma":[0.026594799,0.00059030944,0.0012719623,0.001668984,0.0014600758,0.0043842886,0.0013316701,0.002838459,0.0005228085],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00071506883,0.0011980736,0.14923888,0.0005789957,0.0008978062,0.0010744308,0.0012821322,0.69382024,0.00236952,0.06908108,0.005282646,0.07446104],"study_design_scores_gemma":[0.000045306366,0.00019644167,0.03171221,0.00003845905,0.00008566594,0.00010266921,0.00084401254,0.92753214,0.000678882,0.037691068,0.0010302019,0.000043084412],"about_ca_topic_score_codex":0.021206422,"about_ca_topic_score_gemma":0.01794155,"teacher_disagreement_score":0.021206422,"about_ca_system_score_codex":0.0008800317,"about_ca_system_score_gemma":0.0010590778,"threshold_uncertainty_score":0.042165935},"labels":[],"label_agreement":null},{"id":"W3121817115","doi":"","title":"Expansión de las Redes de Transmisión Eléctrica en Norteamérica: Teoría y Aplicaciones","year":2010,"lang":"es","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electric power transmission; Tariff; Transmission network; Electric power system; Grid; Electric power; Network topology; Welfare economics; Topology (electrical circuits); Transmission (telecommunications); Computer science; Telecommunications; Business; Power (physics); Electrical engineering; Economics; Geography; Computer network; Engineering; Physics","score_opus":0.01142106764216577,"score_gpt":0.27309279300552547,"score_spread":0.2616717253633597,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121817115","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.64435613,0.003164489,0.27518514,0.0017085822,0.0001759819,0.0003843518,0.0005481643,0.0021120983,0.072364956],"genre_scores_gemma":[0.9325805,0.0011456781,0.055325992,0.000041186533,0.000028784521,0.00010467936,0.0001009626,0.000044821285,0.010627451],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99982136,0.00005526394,0.0000053243934,0.000029132714,0.00005832061,0.000030566924],"domain_scores_gemma":[0.99968004,0.00009960797,0.00004549339,0.00006516577,0.00008577586,0.000023932853],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00100192,0.00047888688,0.00022811355,0.0005899511,0.0003889852,0.0010451827,0.0005801293,0.00047816598,0.0049109017],"category_scores_gemma":[0.0013975193,0.00013076619,0.00033540497,0.0006079948,0.00042044255,0.0008289863,0.00033453904,0.00039411624,0.0003404545],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004685086,0.00032130754,0.015346817,0.00032885213,0.00008190393,0.0004978872,0.0004850674,0.3490515,0.0133047085,0.13217215,0.0070616985,0.4808795],"study_design_scores_gemma":[0.00060533435,0.00074822985,0.014677061,0.00020592911,0.00018574503,0.00080600596,0.0006217975,0.82815474,0.016576726,0.03153178,0.10581321,0.00007345374],"about_ca_topic_score_codex":0.04678604,"about_ca_topic_score_gemma":0.057728425,"teacher_disagreement_score":0.04678604,"about_ca_system_score_codex":0.0019623542,"about_ca_system_score_gemma":0.0011943965,"threshold_uncertainty_score":0.09302741},"labels":[],"label_agreement":null},{"id":"W3121913816","doi":"10.1287/opre.2017.1606","title":"Inverse Optimization for the Recovery of Market Structure from Market Outcomes: An Application to the MISO Electricity Market","year":2017,"lang":"en","type":"article","venue":"Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":74,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Wilfrid Laurier University","funders":"","keywords":"Electricity market; Residual; Market power; Commodity; Spot contract; Economics; Market price; Econometrics; Commodity market; Shadow price; Electricity; Derivatives market; Microeconomics; Mathematical optimization; Computer science; Futures contract; Financial economics; Mathematics; Algorithm; Monopoly","score_opus":0.026389042195668316,"score_gpt":0.3199694111104669,"score_spread":0.29358036891479855,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121913816","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025330797,0.00011440984,0.9714035,0.00037860355,0.000019506411,0.000054882035,0.00007952261,0.000102738486,0.0025159644],"genre_scores_gemma":[0.62523264,0.00042283427,0.36844346,0.0001669129,0.00009010409,0.00030509592,0.00032769245,0.0002108277,0.0048003844],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991068,0.00047357508,0.000030411227,0.00011803785,0.00021398265,0.00005715275],"domain_scores_gemma":[0.9960824,0.0029361893,0.0003802602,0.00026973695,0.00025185157,0.0000794981],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038788696,0.00089283846,0.0011633609,0.0007574802,0.00041738997,0.0010603155,0.0010476474,0.00088797463,0.0028378414],"category_scores_gemma":[0.014248683,0.000573991,0.0009985613,0.0008873183,0.0018965582,0.0014751435,0.0016267783,0.002075576,0.00023722871],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004590249,0.000044624798,0.00088232564,0.000051199775,0.000045824287,0.0000996688,0.00007522837,0.90769583,0.0007513008,0.07132424,0.0006244953,0.018359317],"study_design_scores_gemma":[0.0000058315964,0.0000091875045,0.00014190118,0.0000036769457,0.000002068927,0.000008786767,0.000006875646,0.9872792,0.0001555292,0.012177696,0.00020171207,0.000007512796],"about_ca_topic_score_codex":0.0051234644,"about_ca_topic_score_gemma":0.003543091,"teacher_disagreement_score":0.0051234644,"about_ca_system_score_codex":0.0008685734,"about_ca_system_score_gemma":0.0019155153,"threshold_uncertainty_score":0.020513713},"labels":[],"label_agreement":null},{"id":"W3122344694","doi":"","title":"Modeling Alberta Power Prices Through Fundamentals","year":2016,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Bidding; Econometrics; Range (aeronautics); Economics; Sensitivity (control systems); Computer science; Model risk; Probability distribution; Microeconomics; Operations research; Risk management; Engineering","score_opus":0.0060179060654339915,"score_gpt":0.2056135626786,"score_spread":0.19959565661316603,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3122344694","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3625527,0.00040686261,0.5294217,0.0016261232,0.000116649666,0.0001062167,0.0013545718,0.00047569533,0.103939466],"genre_scores_gemma":[0.9761568,0.00018555562,0.012199049,0.000046891924,0.00001767715,0.000042804437,0.00019109412,0.000028862314,0.011131353],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997547,0.000059873793,0.0000071753607,0.000042985743,0.000082423416,0.000052783944],"domain_scores_gemma":[0.99969435,0.00010818986,0.000052314903,0.00002101703,0.0000822464,0.000041964304],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004013054,0.0005592939,0.00039707567,0.00038724273,0.0005096935,0.002011612,0.0012011532,0.0010862217,0.0038141753],"category_scores_gemma":[0.0011808156,0.00036876995,0.0004795847,0.00057059655,0.0010152541,0.0012041894,0.00081438955,0.0010649591,0.00026457867],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009671354,0.000009453401,0.0005547995,0.000004106325,0.000004504049,0.000032298285,0.000018776753,0.9731694,0.00018362697,0.02498367,0.00020171226,0.0008280924],"study_design_scores_gemma":[0.0000061365286,0.000008418019,0.00025636834,0.0000033011022,0.000003907112,0.000008262234,0.000014460375,0.9895927,0.00008813797,0.009053703,0.00095917843,0.000005421172],"about_ca_topic_score_codex":0.13063952,"about_ca_topic_score_gemma":0.08342612,"teacher_disagreement_score":0.86936045,"about_ca_system_score_codex":0.0030407577,"about_ca_system_score_gemma":0.0026327393,"threshold_uncertainty_score":0.25975823},"labels":[],"label_agreement":null},{"id":"W3122350098","doi":"10.5547/01956574.41.4.dbro","title":"Imperfect Competition in Electricity Markets with Renewable Generation: The Role of Renewable Compensation Policies","year":2019,"lang":"en","type":"preprint","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Incentive; Renewable energy; Market power; Tariff; Microeconomics; Economics; Industrial organization; Business; International economics","score_opus":0.006776516408414862,"score_gpt":0.18991245364946924,"score_spread":0.18313593724105437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3122350098","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9155514,0.00081285177,0.059307247,0.0025565824,0.00008741593,0.00010807179,0.00029474052,0.00011748053,0.021164106],"genre_scores_gemma":[0.9974815,0.0001528769,0.0010813692,0.00009560928,0.000021354748,0.000014517704,0.000022405551,0.0000062009635,0.0011240687],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99847895,0.00070488953,0.000053347656,0.00016661409,0.0001597137,0.00043655036],"domain_scores_gemma":[0.9835218,0.009317454,0.0052990923,0.0006003261,0.0005123056,0.0007489341],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033221329,0.0006686345,0.0015683688,0.00046221854,0.0007092377,0.0031349638,0.0013520792,0.0022275564,0.004850581],"category_scores_gemma":[0.014224838,0.000590144,0.0010418463,0.0005648833,0.0024997187,0.0027982194,0.0011549834,0.0017650602,0.00026445283],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038914275,0.00040299425,0.00981983,0.00020937453,0.00017467274,0.0006136337,0.00011620298,0.78341794,0.0030665514,0.1926475,0.001943491,0.0071987472],"study_design_scores_gemma":[0.00028444102,0.00034386822,0.0070286226,0.000044429948,0.00010062191,0.0001083939,0.00029703995,0.8662389,0.00081422215,0.123634465,0.0010224327,0.000082580336],"about_ca_topic_score_codex":0.009563012,"about_ca_topic_score_gemma":0.008211945,"teacher_disagreement_score":0.009563012,"about_ca_system_score_codex":0.0020908315,"about_ca_system_score_gemma":0.0018063748,"threshold_uncertainty_score":0.019014657},"labels":[],"label_agreement":null},{"id":"W3122435534","doi":"","title":"The Influence of Renewable Energy Sources on the Czech Electricity Transmission System","year":2017,"lang":"en","type":"preprint","venue":"Econstor (Econstor)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"McGill University; Grantová Agentura České Republiky; European Commission; Univerzita Karlova v Praze","keywords":"Renewable energy; Volatility (finance); Wind power; Electricity; Economics; Electric power transmission; Czech; Transmission (telecommunications); Environmental science; Environmental economics; Econometrics; Engineering; Telecommunications; Electrical engineering","score_opus":0.0075097335478316275,"score_gpt":0.19591951026473065,"score_spread":0.188409776716899,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3122435534","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9704874,0.00055432366,0.0051098214,0.00027544732,0.00004134341,0.000051022507,0.0011153544,0.000088162014,0.02227719],"genre_scores_gemma":[0.9988136,0.0001100297,0.00031266146,0.000008418792,0.0000021859055,0.000008368538,0.00010957419,0.000010868389,0.00062437984],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959916,0.00016509843,0.000021191025,0.000048848688,0.00007056006,0.00009515834],"domain_scores_gemma":[0.9995534,0.00021190145,0.00007836669,0.000035220375,0.00007813133,0.000042944517],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054356264,0.00050302263,0.0004431925,0.0006513564,0.00034577333,0.0015808323,0.0004619948,0.00047082306,0.001602317],"category_scores_gemma":[0.0020806408,0.00022576521,0.0006869075,0.0008688544,0.00037647958,0.00070416025,0.0006626397,0.000519439,0.00014080654],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011824289,0.000020628171,0.00400171,0.000051510833,0.00005120047,0.0002139398,0.000013997309,0.98988336,0.0009602337,0.0025121165,0.00033284072,0.0018403443],"study_design_scores_gemma":[0.00010180534,0.00021191908,0.020374954,0.000040264655,0.00012145974,0.00010943983,0.00021346164,0.97231776,0.0022700347,0.0021972721,0.0019875723,0.000054080163],"about_ca_topic_score_codex":0.0419134,"about_ca_topic_score_gemma":0.024582157,"teacher_disagreement_score":0.0419134,"about_ca_system_score_codex":0.0013791834,"about_ca_system_score_gemma":0.0009880107,"threshold_uncertainty_score":0.08333886},"labels":[],"label_agreement":null},{"id":"W3122527201","doi":"","title":"Options for Electricity Transmission Regulation in Australia","year":2000,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Electricity; Incentive; Investment (military); Electricity market; Transmission (telecommunications); Industrial organization; Marginal cost; Electric power transmission; Economics; Business; Electricity retailing; Microeconomics; Environmental economics; Telecommunications; Engineering; Electrical engineering","score_opus":0.008299675699609951,"score_gpt":0.23236468138861807,"score_spread":0.2240650056890081,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3122527201","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23520035,0.02212541,0.133451,0.034122784,0.0006552391,0.000509858,0.00027853475,0.00026273864,0.57339406],"genre_scores_gemma":[0.9189928,0.004688928,0.021413777,0.0021791528,0.00015594397,0.00023388208,0.00007665535,0.000028861843,0.05223001],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99688977,0.0012545907,0.0001606622,0.00028499126,0.0011580504,0.00025188888],"domain_scores_gemma":[0.99807715,0.00069871265,0.00029175356,0.00019739076,0.0005976441,0.00013730326],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004063183,0.00023448009,0.00036899117,0.00074056705,0.0011236013,0.0025838432,0.0012123972,0.002202411,0.005646201],"category_scores_gemma":[0.006290501,0.00028404663,0.0005659229,0.0006662076,0.0018221247,0.0022319325,0.0016489037,0.0017741674,0.00043035127],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049663508,0.000095403186,0.0010483328,0.00024311877,0.000030368597,0.0003431943,0.0006093381,0.021842131,0.0023565227,0.9098143,0.0051270598,0.058440637],"study_design_scores_gemma":[0.00014684208,0.0003409986,0.009989838,0.0005945091,0.00012659449,0.00058220525,0.0006771509,0.08277169,0.0031603833,0.64452153,0.25695214,0.00013615582],"about_ca_topic_score_codex":0.015698742,"about_ca_topic_score_gemma":0.025177373,"teacher_disagreement_score":0.015698742,"about_ca_system_score_codex":0.0038914073,"about_ca_system_score_gemma":0.0052699856,"threshold_uncertainty_score":0.031214714},"labels":[],"label_agreement":null},{"id":"W3123365842","doi":"","title":"Supply Function Equilibria with Capacity Constraints and Pivotal Suppliers","year":2010,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Bidding; Common value auction; Supply; Market power; Economics; Electricity market; Microeconomics; Function (biology); Electricity","score_opus":0.012554585442664266,"score_gpt":0.2300167134268283,"score_spread":0.21746212798416403,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3123365842","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30758628,0.00059493375,0.5781356,0.003992113,0.00010210027,0.00020710245,0.0007152688,0.00028303394,0.10838356],"genre_scores_gemma":[0.97850627,0.00035328206,0.013981401,0.00021061224,0.000068468835,0.00014328412,0.00017295565,0.000051502804,0.006512322],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99777955,0.00096996594,0.00011562494,0.00035007452,0.00034669178,0.00043810904],"domain_scores_gemma":[0.990427,0.0055074533,0.0017722651,0.000752147,0.0011124603,0.00042865975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032337108,0.0009345805,0.0017079203,0.0010985123,0.0011888648,0.0031741655,0.0015115084,0.002362364,0.011902251],"category_scores_gemma":[0.018102493,0.00089230563,0.0016117832,0.001207245,0.002515345,0.0060218517,0.0024019,0.0021950242,0.0011767666],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000073395044,0.00005561811,0.00064114813,0.000065526714,0.000031178348,0.0002703922,0.00016567897,0.05303709,0.0007645547,0.93937474,0.0018285447,0.0036920994],"study_design_scores_gemma":[0.00012344818,0.00003919149,0.00033921064,0.000036111094,0.000016346217,0.00024229847,0.00019436725,0.20470858,0.0005786548,0.79153,0.0021592295,0.000032657925],"about_ca_topic_score_codex":0.0019337788,"about_ca_topic_score_gemma":0.0012006745,"teacher_disagreement_score":0.011902251,"about_ca_system_score_codex":0.001949777,"about_ca_system_score_gemma":0.0015430452,"threshold_uncertainty_score":0.039816976},"labels":[],"label_agreement":null},{"id":"W3123454487","doi":"","title":"Nodal Pricing and Transmissions Losses. An Application to a Hydroelectric Power System","year":2000,"lang":"en","type":"article","venue":"Cahiers de recherche","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydroelectricity; Electricity; Electricity market; Electric power transmission; Economics; Econometrics; Consumption (sociology); Quadratic equation; Hydropower; Order (exchange); Microeconomics; Telecommunications; Electrical engineering; Computer science; Mathematics; Engineering; Finance","score_opus":0.019662653590675153,"score_gpt":0.26725489768113403,"score_spread":0.24759224409045888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3123454487","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3198238,0.002209273,0.63469225,0.0016701216,0.00019457933,0.00021782065,0.0012791608,0.00049755856,0.03941555],"genre_scores_gemma":[0.9682501,0.00073495565,0.022147985,0.00005514796,0.000043246768,0.00004536032,0.00019216983,0.000077064244,0.008453873],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938,0.00037070466,0.000016193952,0.000063534506,0.000118322845,0.00005129248],"domain_scores_gemma":[0.99761546,0.0017811785,0.00020527423,0.00011405767,0.00023131915,0.000052769792],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016309175,0.00090469414,0.00051697326,0.0005827767,0.00044545444,0.0012127669,0.0015547023,0.0010179024,0.0046899044],"category_scores_gemma":[0.0094897235,0.00039000076,0.00058465323,0.0017639046,0.0006462486,0.0012104022,0.0007140781,0.0011401149,0.00028297838],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025125975,0.000012300738,0.0012238529,0.000018246183,0.0000118882,0.00006973131,0.000024312902,0.98329145,0.00012466732,0.009183056,0.0003119486,0.0057033226],"study_design_scores_gemma":[0.0000038205258,0.000009262163,0.00058901974,0.000004119309,0.000006272492,0.000025508858,0.000013731345,0.9952715,0.00007515569,0.0035332995,0.00046352088,0.000004826862],"about_ca_topic_score_codex":0.09794478,"about_ca_topic_score_gemma":0.056709714,"teacher_disagreement_score":0.09794478,"about_ca_system_score_codex":0.002451255,"about_ca_system_score_gemma":0.0009030974,"threshold_uncertainty_score":0.19474941},"labels":[],"label_agreement":null},{"id":"W3123467622","doi":"","title":"Motivating the Optimal Procurement and Deployment of Electric Storage as a Transmission Asset","year":2019,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund; Government of Canada","keywords":"Procurement; Electric utility; Asset (computer security); Software deployment; Service (business); Business; Transmission (telecommunications); Electricity; Industrial organization; Environmental economics; Mains electricity; Microeconomics; Commerce; Economics; Computer science; Engineering; Computer security; Marketing; Telecommunications","score_opus":0.015170230381379943,"score_gpt":0.2650676472792144,"score_spread":0.24989741689783446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3123467622","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36552042,0.003997352,0.35417846,0.031274375,0.0003448568,0.00053935725,0.00120316,0.0001674388,0.24277464],"genre_scores_gemma":[0.95695424,0.0016826915,0.028018054,0.00039485106,0.00015979509,0.00018720854,0.00007895929,0.000056910332,0.01246718],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987531,0.00076729566,0.000027297196,0.00016892003,0.0000784598,0.00020502832],"domain_scores_gemma":[0.99623495,0.002930333,0.00028228012,0.00009094311,0.00016653049,0.00029498496],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019674844,0.0009391458,0.0012730883,0.0007262588,0.0009842287,0.0030745892,0.0014942054,0.005022446,0.009985343],"category_scores_gemma":[0.008368352,0.00096295675,0.000603115,0.0009943073,0.0027251565,0.0026746222,0.0019997957,0.0026230796,0.00042312112],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003485481,0.00028162726,0.0012928261,0.00033958227,0.00006590552,0.00076629897,0.00019247178,0.46765167,0.001226976,0.51468307,0.0050078956,0.008143177],"study_design_scores_gemma":[0.00026848158,0.00018023454,0.0009907065,0.00013626099,0.00005178843,0.00013735551,0.0006554208,0.5775567,0.0005534255,0.41127175,0.008133211,0.00006454746],"about_ca_topic_score_codex":0.008263384,"about_ca_topic_score_gemma":0.0068619098,"teacher_disagreement_score":0.009985343,"about_ca_system_score_codex":0.0025117288,"about_ca_system_score_gemma":0.0028494948,"threshold_uncertainty_score":0.03340435},"labels":[],"label_agreement":null},{"id":"W3124039149","doi":"","title":"An Economic and Stakeholder Analysis for the Design of IPP Contracts for Wind Farms","year":2016,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of California, Los Angeles; Loughborough University; Imperial College London; Queen's University; University of Warwick; George Washington University","keywords":"Cape verde; Stakeholder; Business; Investment (military); Government (linguistics); Net present value; Yield (engineering); Wind power; Finance; Rate of return; Private sector; Economics; Economy; Microeconomics; Engineering; Economic growth","score_opus":0.054047453645220234,"score_gpt":0.2984295675155804,"score_spread":0.24438211387036018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124039149","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010050874,0.00015195555,0.9724665,0.0008591931,0.00003945152,0.00036748862,0.00008109777,0.000036928475,0.015946386],"genre_scores_gemma":[0.44715202,0.00049476157,0.5426765,0.0002643829,0.00011699184,0.0011703318,0.00016856033,0.000096052674,0.0078604175],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99223584,0.005224363,0.0002091071,0.000446604,0.0015021104,0.0003820121],"domain_scores_gemma":[0.9879446,0.00975669,0.0006645224,0.00045522285,0.0008978508,0.00028116067],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012294472,0.0014116007,0.0012597782,0.0017803225,0.0016131612,0.0035543984,0.0014989738,0.002735322,0.011413797],"category_scores_gemma":[0.023698043,0.0011150775,0.0022574156,0.0011336802,0.0025073418,0.0057812524,0.0026811908,0.003730125,0.00057087996],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006361617,0.00014390341,0.001241257,0.00022530842,0.00006222867,0.0002745024,0.00037001484,0.32587925,0.0015507953,0.63795894,0.0017773928,0.030452909],"study_design_scores_gemma":[0.000028302216,0.00010789328,0.0003622713,0.000095503216,0.000028232826,0.000087952576,0.00031831142,0.72216034,0.0006719984,0.26952633,0.00658379,0.000029099823],"about_ca_topic_score_codex":0.00266015,"about_ca_topic_score_gemma":0.0031885053,"teacher_disagreement_score":0.012294472,"about_ca_system_score_codex":0.0039519146,"about_ca_system_score_gemma":0.005254386,"threshold_uncertainty_score":0.065020144},"labels":[],"label_agreement":null},{"id":"W3124215582","doi":"10.1016/j.eneco.2016.03.013","title":"Measuring demand responses to wholesale electricity prices using market power indices","year":2016,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"Social Sciences and Humanities Research Council of Canada","keywords":"Economics; Price elasticity of demand; Lerner index; Market power; Cournot competition; Econometrics; Natural gas prices; Index (typography); Price index; Electricity market; Demand curve; Electricity; Agricultural economics; Microeconomics","score_opus":0.01287710347201598,"score_gpt":0.18498530074111247,"score_spread":0.17210819726909649,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124215582","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9553799,0.000045905104,0.034774862,0.00012244198,0.00003918747,0.000050536524,0.0006730705,0.00029789365,0.008616111],"genre_scores_gemma":[0.9937056,0.000028192679,0.005280457,0.000012912807,0.000008869646,0.000015529335,0.00036528098,0.000027886583,0.0005552442],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.999482,0.00017119391,0.000033859706,0.000066076325,0.00020806528,0.000038886898],"domain_scores_gemma":[0.9988966,0.0005702709,0.00017128792,0.00011299867,0.00021215499,0.00003662496],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005839969,0.0005804637,0.0003500965,0.0009033542,0.00018353468,0.00085506967,0.0003410898,0.00034752433,0.0018648959],"category_scores_gemma":[0.0031873628,0.00032596153,0.00029739086,0.0014556929,0.0001695339,0.0010888645,0.00028061762,0.00055804383,0.0005214071],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013900528,0.0013208739,0.2962785,0.00036531605,0.00061563274,0.00035902488,0.00042705334,0.38462344,0.12518327,0.009395009,0.0064519453,0.17358992],"study_design_scores_gemma":[0.00005079042,0.00033636994,0.11591493,0.00000985912,0.00007543776,0.00012554934,0.00029009252,0.8491013,0.02973502,0.00264566,0.0016668227,0.000048095564],"about_ca_topic_score_codex":0.0019451096,"about_ca_topic_score_gemma":0.0046296543,"teacher_disagreement_score":0.0019451096,"about_ca_system_score_codex":0.00036416698,"about_ca_system_score_gemma":0.0001969755,"threshold_uncertainty_score":0.0062387586},"labels":[],"label_agreement":null},{"id":"W3124723900","doi":"10.1016/j.jup.2014.05.003","title":"The EU internal electricity market: Done forever?","year":2014,"lang":"en","type":"article","venue":"Utilities Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity market; Quarter (Canadian coin); Decentralization; Domestic market; Consumption (sociology); Market economy; Renewable energy; Economics; Business; Industrial organization; International trade; Engineering","score_opus":0.003202275714546914,"score_gpt":0.1913101816904742,"score_spread":0.18810790597592728,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124723900","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03561886,0.032518733,0.0044658366,0.7786881,0.012365351,0.00002225152,0.0006716968,0.0002247748,0.13542446],"genre_scores_gemma":[0.67148155,0.018002344,0.003078341,0.23753923,0.0053137224,0.000055865286,0.0004146186,0.00030099665,0.063813366],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99773115,0.00077188684,0.00008408647,0.00030800345,0.00045081208,0.0006541586],"domain_scores_gemma":[0.9975224,0.00075027125,0.00027667492,0.0001942099,0.00056588394,0.00069050596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005633352,0.0006095405,0.0010888319,0.0005781168,0.0016055484,0.013264767,0.001194953,0.011275335,0.017750451],"category_scores_gemma":[0.011527874,0.00023130457,0.00067929015,0.0010717313,0.0040502483,0.013521752,0.0028961736,0.006144696,0.0026869886],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025950363,0.00011395592,0.0014080103,0.00021825114,0.00008563408,0.00019549209,0.0004293644,0.001658957,0.00054535444,0.77426475,0.15693304,0.06388772],"study_design_scores_gemma":[0.00012352418,0.000119315795,0.006081088,0.0015044337,0.00010109468,0.0002118408,0.003907179,0.0021103967,0.0011298581,0.44261032,0.5419762,0.00012476636],"about_ca_topic_score_codex":0.007261025,"about_ca_topic_score_gemma":0.008312554,"teacher_disagreement_score":0.017750451,"about_ca_system_score_codex":0.0025683625,"about_ca_system_score_gemma":0.007166547,"threshold_uncertainty_score":0.059381127},"labels":[],"label_agreement":null},{"id":"W3124817670","doi":"","title":"Investment in Electricity Markets with Asymmetric Technologies","year":2009,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Markov perfect equilibrium; Investment (military); Electricity; Economics; Generator (circuit theory); Competition (biology); Markov chain; Microeconomics; Competitive equilibrium; Nash equilibrium; Computer science; Engineering; Thermodynamics; Physics; Power (physics)","score_opus":0.01192476405860325,"score_gpt":0.24561362714672794,"score_spread":0.2336888630881247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124817670","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6787248,0.0015450015,0.2595973,0.004138011,0.00012258418,0.00011922969,0.00040609945,0.00019269055,0.05515424],"genre_scores_gemma":[0.99202454,0.00027254055,0.002464106,0.00006764644,0.000039167746,0.000030835523,0.00003579027,0.000014262587,0.005051208],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99865437,0.00063055276,0.000040206993,0.00016217394,0.00020900344,0.0003035726],"domain_scores_gemma":[0.99526936,0.002950404,0.0011059622,0.00019574261,0.00019994986,0.00027850555],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022792167,0.0007973991,0.0010170523,0.00056365517,0.0005929662,0.0026995442,0.0012695567,0.002451598,0.0045737578],"category_scores_gemma":[0.009255185,0.0007405141,0.0007552138,0.0006672197,0.002284988,0.0042426423,0.0012399288,0.0015182665,0.0003211385],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014278691,0.00009269265,0.001413201,0.00008018149,0.000042126656,0.00042834826,0.000104215665,0.34320456,0.0011185119,0.6468166,0.0011705388,0.0053862603],"study_design_scores_gemma":[0.000097816875,0.00006400223,0.0006493611,0.000021262651,0.000024194364,0.000094947616,0.00006905761,0.64799315,0.00031310954,0.34971794,0.0009298746,0.000025313193],"about_ca_topic_score_codex":0.0022468923,"about_ca_topic_score_gemma":0.0017459972,"teacher_disagreement_score":0.0045737578,"about_ca_system_score_codex":0.0030417268,"about_ca_system_score_gemma":0.0010912025,"threshold_uncertainty_score":0.022069395},"labels":[],"label_agreement":null},{"id":"W3124842095","doi":"","title":"Local Labor Market Impacts of Energy Boom-Bust-Boom in Western Canada","year":2011,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"University of Alberta","keywords":"Boom; Bust; Earnings; Labour economics; Economics; Price shock; Business; Monetary economics; Engineering; Finance","score_opus":0.010606386770465171,"score_gpt":0.23296133171910904,"score_spread":0.22235494494864388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124842095","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.992605,0.00018509403,0.000056883688,0.00042115437,0.0000050101075,0.00001430186,0.0020462715,0.000012316128,0.004654085],"genre_scores_gemma":[0.9951565,0.0002187016,0.000055537843,0.000052359148,0.000002078299,0.0000050499516,0.0010720417,0.0000057565435,0.003431944],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995491,0.00002129356,0.000010384088,0.000041472387,0.00009901826,0.00027871976],"domain_scores_gemma":[0.9993327,0.000038986982,0.000074068164,0.000013849088,0.00025574982,0.0002845289],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025054027,0.00022460603,0.0004026992,0.0010422138,0.0025236113,0.0016375226,0.0006351667,0.0002528165,0.0045314743],"category_scores_gemma":[0.00083699153,0.00019073112,0.00034805536,0.0031219965,0.00096296275,0.00033046858,0.0011889718,0.0004880776,0.00022019216],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006199963,0.0001581795,0.94188136,0.00013247182,0.00015534653,0.0011791375,0.004736889,0.009036792,0.0019009808,0.00443271,0.009850743,0.025915338],"study_design_scores_gemma":[0.000014765458,0.000022376506,0.985114,0.000022332757,0.000020605947,0.000030002555,0.008414373,0.0019630583,0.00023929878,0.00018158178,0.0039558173,0.00002189036],"about_ca_topic_score_codex":0.9978137,"about_ca_topic_score_gemma":0.9992162,"teacher_disagreement_score":0.039212123,"about_ca_system_score_codex":0.039212123,"about_ca_system_score_gemma":0.02863759,"threshold_uncertainty_score":0.2845052},"labels":[],"label_agreement":null},{"id":"W3125140514","doi":"","title":"Power Trade, Welfare, and Air Quality","year":2014,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Autarky; Economics; Welfare; Volatility (finance); Electricity; Electricity market; Market power; Air quality index; Electricity price; International economics; Monetary economics; Agricultural economics; Microeconomics; Econometrics; Market economy; Engineering","score_opus":0.017162040589624714,"score_gpt":0.2835752862813007,"score_spread":0.26641324569167596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125140514","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9920162,0.00016519596,0.0009302182,0.0001972169,0.0000025568022,0.000012445344,0.0034339437,0.000017558114,0.003224623],"genre_scores_gemma":[0.9965749,0.000116052935,0.0001994211,0.00000938553,0.000002191134,0.0000049654636,0.0016459032,0.000004648523,0.0014426276],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997814,0.000036641817,0.0000068222175,0.000038012975,0.000060231105,0.00007688952],"domain_scores_gemma":[0.9990426,0.00035133155,0.0002565862,0.00008630413,0.00019617054,0.00006713697],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042440635,0.00026767544,0.00035662387,0.00053969433,0.0005157969,0.00090228324,0.00035010502,0.00033538995,0.0031259526],"category_scores_gemma":[0.0019316202,0.00020242162,0.0005038362,0.0013379775,0.0007592613,0.00054600864,0.00034348512,0.00026901194,0.0001819607],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028834734,0.000115336785,0.56667966,0.00008322226,0.000362432,0.00028104542,0.00042963875,0.41213277,0.00167493,0.005532865,0.002710672,0.009709072],"study_design_scores_gemma":[0.00007413367,0.00012164363,0.71740127,0.000024313205,0.00011595079,0.0000802181,0.00073023397,0.26882324,0.0014006846,0.0052320845,0.005939631,0.000056602457],"about_ca_topic_score_codex":0.8440331,"about_ca_topic_score_gemma":0.889792,"teacher_disagreement_score":0.8440331,"about_ca_system_score_codex":0.008658581,"about_ca_system_score_gemma":0.0021477267,"threshold_uncertainty_score":0.31377077},"labels":[],"label_agreement":null},{"id":"W3125484123","doi":"10.15173/esr.v17i1.518","title":"Modelling Spot Prices in Deregulated Wholesale Electricity Markets: A Selected Empirical Review","year":2011,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity; Restructuring; Deregulation; Volatility (finance); Electricity market; Spot contract; Economics; Industrial organization; Electricity retailing; Business; Financial economics; Microeconomics; Macroeconomics; Finance; Futures contract","score_opus":0.05216892007799506,"score_gpt":0.26937096762240287,"score_spread":0.2172020475444078,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125484123","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.114602126,0.72436607,0.13731423,0.0031881605,0.00023386252,0.00012835622,0.0010100206,0.0002818019,0.018875476],"genre_scores_gemma":[0.29367343,0.6787656,0.023873784,0.00015083734,0.00026834765,0.00006284952,0.0010257047,0.000069803806,0.002109639],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.9988952,0.00048473803,0.00015189625,0.0001561034,0.00027008515,0.000041897307],"domain_scores_gemma":[0.9915733,0.0073003583,0.00036929912,0.00013565767,0.0005934501,0.00002794301],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003127266,0.0010154325,0.001612239,0.0021732096,0.00018497018,0.0024651552,0.0014660815,0.0011724253,0.0018560694],"category_scores_gemma":[0.008734515,0.00068342383,0.0014198587,0.0059516695,0.0004513799,0.0030250957,0.0004126606,0.00072872237,0.00063039875],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020266365,0.00042734345,0.0158486,0.014548718,0.0011723312,0.00059165095,0.0005348089,0.33066186,0.0013015862,0.06316985,0.0076426826,0.56389797],"study_design_scores_gemma":[0.00008552482,0.0005185936,0.025677161,0.010310992,0.0018487764,0.00089335995,0.0016421408,0.77365094,0.004596827,0.054321643,0.12622663,0.00022741593],"about_ca_topic_score_codex":0.005751583,"about_ca_topic_score_gemma":0.003933731,"teacher_disagreement_score":0.005751583,"about_ca_system_score_codex":0.00077482895,"about_ca_system_score_gemma":0.0012462996,"threshold_uncertainty_score":0.01653874},"labels":[],"label_agreement":null},{"id":"W3125844522","doi":"","title":"Electricity prices and cost factors","year":2001,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Quality (philosophy); Range (aeronautics); Electricity price; Economics; Business; Service (business); Agricultural economics; Environmental economics; Natural resource economics; Economy; Engineering","score_opus":0.0221385387093278,"score_gpt":0.2743864056165667,"score_spread":0.2522478669072389,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125844522","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.74190015,0.003935946,0.027017498,0.0015396242,0.00009744803,0.0001246755,0.0020565877,0.000045844557,0.2232822],"genre_scores_gemma":[0.9894433,0.0009822877,0.0012836936,0.0000329646,0.000042763553,0.00001275611,0.00030603455,0.000016742519,0.007879386],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99936754,0.00007918851,0.000022852271,0.00006307176,0.00036928226,0.00009805585],"domain_scores_gemma":[0.9984213,0.00082370336,0.00022667715,0.000046665547,0.00041982016,0.000061780425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034338378,0.0002614913,0.0002917086,0.00087386963,0.0002924931,0.0022924545,0.00022715186,0.0003708885,0.005580809],"category_scores_gemma":[0.005759864,0.0001798849,0.00021665021,0.0019344203,0.00045414772,0.0011511692,0.00025520683,0.000591367,0.00034393815],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022945256,0.000109695924,0.12956591,0.00034651213,0.00022861916,0.0009781333,0.000820502,0.24425398,0.0025724198,0.47160023,0.00918016,0.1401143],"study_design_scores_gemma":[0.00008336624,0.00023165817,0.5404087,0.00018722698,0.00017077003,0.0013291616,0.0024335673,0.13134722,0.0031731862,0.18036827,0.14011039,0.00015648593],"about_ca_topic_score_codex":0.03692313,"about_ca_topic_score_gemma":0.03826494,"teacher_disagreement_score":0.03692313,"about_ca_system_score_codex":0.0024056092,"about_ca_system_score_gemma":0.00075691345,"threshold_uncertainty_score":0.07341647},"labels":[],"label_agreement":null},{"id":"W3125976394","doi":"10.18280/isi.250602","title":"Simulated Annealing Algorithm for Dynamic Economic Dispatch Problem in the Electricity Market Incorporating Wind Energy","year":2020,"lang":"en","type":"article","venue":"Ingénierie des systèmes d information","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Economic dispatch; Bidding; Electricity market; Market clearing; Mathematical optimization; Computer science; Wind power; Simulated annealing; Electric power system; Profit (economics); Bilevel optimization; Electricity; Optimization problem; Economics; Engineering; Microeconomics; Power (physics); Algorithm; Mathematics","score_opus":0.0061748806360793305,"score_gpt":0.1943887107610289,"score_spread":0.18821383012494958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125976394","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015137389,0.00031278114,0.97961664,0.00017992764,0.000044672568,0.00006544062,0.000055373937,0.00022431236,0.004363482],"genre_scores_gemma":[0.46099496,0.000576941,0.5317198,0.00013112108,0.0000509332,0.00059080304,0.00030533556,0.00015792859,0.0054721204],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956566,0.00023896238,0.000018072185,0.000063763815,0.00007004214,0.000043405376],"domain_scores_gemma":[0.999526,0.00031530386,0.00004073665,0.000023625045,0.000074348325,0.00001999311],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00081076426,0.00092314056,0.0012043385,0.00050023093,0.00052360125,0.00083229353,0.00082734285,0.000945943,0.0023965323],"category_scores_gemma":[0.0015359019,0.0005158807,0.0007385756,0.00066153164,0.00052373327,0.0007228819,0.00064736593,0.0010578028,0.00043126484],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040666695,0.000022926539,0.00021053337,0.000039954597,0.000032374857,0.000027445389,0.00003959749,0.978014,0.00050663546,0.0058876043,0.00052713923,0.014651109],"study_design_scores_gemma":[0.000010429878,0.000014800891,0.000043632826,0.0000038154526,0.0000043042046,0.0000062958634,0.0000058423957,0.9976432,0.00011395711,0.0017045325,0.000446912,0.000002302759],"about_ca_topic_score_codex":0.0058510257,"about_ca_topic_score_gemma":0.005494942,"teacher_disagreement_score":0.0058510257,"about_ca_system_score_codex":0.0007115775,"about_ca_system_score_gemma":0.0012657396,"threshold_uncertainty_score":0.011633933},"labels":[],"label_agreement":null},{"id":"W3126085421","doi":"10.2139/ssrn.3198117","title":"Strategic Use of Storage: The Impact of Carbon Policy, Resource Availability, and Technology Efficiency on a Renewable-Thermal Power System","year":2018,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Carbon capture and storage (timeline); Environmental economics; Renewable energy; Incentive; Business; Carbon tax; Thermal energy storage; Industrial organization; Energy storage; Renewable resource; Profit (economics); Marginal value; Natural resource economics; Economics; Greenhouse gas; Microeconomics; Climate change; Power (physics); Engineering","score_opus":0.007470031320176298,"score_gpt":0.2212708062700971,"score_spread":0.2138007749499208,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3126085421","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9792436,0.00056193414,0.0021136364,0.0022645255,0.00005268233,0.000023869186,0.00038722996,0.00003454086,0.015318089],"genre_scores_gemma":[0.9994093,0.000075247226,0.00007654738,0.000022066215,0.000003880152,0.0000017964641,0.000028639612,0.0000024458043,0.00038007708],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99927837,0.00032079683,0.00004242726,0.00005980658,0.000105113875,0.00019358049],"domain_scores_gemma":[0.9962997,0.0020954604,0.00051510404,0.00011206921,0.00058152335,0.00039625503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017049912,0.00046038115,0.00083814474,0.0005210333,0.0005743579,0.003040547,0.0008298371,0.0012812098,0.004753977],"category_scores_gemma":[0.0042599374,0.0003701806,0.0005400219,0.00084648625,0.000812401,0.0021127919,0.0010641416,0.0011175771,0.00026097675],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0038024865,0.00095922756,0.090241745,0.00054442557,0.0007076011,0.0020652665,0.00029594483,0.75327384,0.013037901,0.104845844,0.004179615,0.026046032],"study_design_scores_gemma":[0.00050765905,0.0021875997,0.10671423,0.00011570762,0.00096831477,0.00060180685,0.005058543,0.748833,0.013111968,0.11633663,0.0053428295,0.0002216242],"about_ca_topic_score_codex":0.010887811,"about_ca_topic_score_gemma":0.026070667,"teacher_disagreement_score":0.010887811,"about_ca_system_score_codex":0.0019853672,"about_ca_system_score_gemma":0.0026758816,"threshold_uncertainty_score":0.021648884},"labels":[],"label_agreement":null},{"id":"W3126405872","doi":"10.1109/epec48502.2020.9320108","title":"Scenario Selection for Generation Expansion Planning with Demand and Wind Uncertainty","year":2020,"lang":"en","type":"article","venue":"2020 IEEE Electric Power and Energy Conference (EPEC)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Cluster analysis; Selection (genetic algorithm); k-means clustering; Computer science; Reliability (semiconductor); Wind power; Investment (military); Duration (music); Capacity planning; Engineering; Artificial intelligence; Power (physics)","score_opus":0.014228665060730002,"score_gpt":0.19998050249737756,"score_spread":0.18575183743664755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3126405872","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4679628,0.00069538516,0.518359,0.00042095847,0.000039588365,0.0004199078,0.0011567265,0.0005262222,0.010419369],"genre_scores_gemma":[0.9503747,0.00013279513,0.048187796,0.000021628133,0.000006391149,0.00013868201,0.00059529376,0.000039171482,0.0005035941],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991198,0.0006236095,0.00001972322,0.000071258146,0.000100721125,0.000064721964],"domain_scores_gemma":[0.9985008,0.0011081751,0.00010459068,0.0000615857,0.00015803539,0.000066674016],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001427349,0.0007923556,0.00050530216,0.0010781792,0.000364176,0.0006218763,0.00053233537,0.0004455515,0.0023280194],"category_scores_gemma":[0.003624295,0.00044022023,0.00052974955,0.0010494641,0.00027256436,0.0008215091,0.00042066985,0.0005662067,0.00017590534],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010076292,0.00002360862,0.000659412,0.00002996247,0.000031293526,0.000074944575,0.000022636925,0.98501354,0.00045559063,0.0019829005,0.00036549152,0.0112397745],"study_design_scores_gemma":[0.000011321262,0.000044713433,0.00038028843,0.000007980779,0.000010089574,0.000025247364,0.00002600911,0.9961255,0.0005804485,0.0024715015,0.0003106437,0.000006302596],"about_ca_topic_score_codex":0.0038056963,"about_ca_topic_score_gemma":0.0046288855,"teacher_disagreement_score":0.0038056963,"about_ca_system_score_codex":0.0007510931,"about_ca_system_score_gemma":0.00085323595,"threshold_uncertainty_score":0.007787943},"labels":[],"label_agreement":null},{"id":"W3130884250","doi":"","title":"Managing Hydro Capacity, Transmission and Competition: Lessons from British Columbia","year":2007,"lang":"en","type":"article","venue":"Energy Markets and Sustainability in a Larger Europe,9th IAEE European Conference,June 10-31, 2007","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Competition (biology); Business; Geography; Ecology","score_opus":0.006994465130633126,"score_gpt":0.19811983341904033,"score_spread":0.1911253682884072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3130884250","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73307896,0.0022366599,0.0037939544,0.01420559,0.00007744096,0.00007958573,0.0007172463,0.00012926862,0.24568132],"genre_scores_gemma":[0.94039106,0.0018111933,0.0027661948,0.0006602694,0.0000106741745,0.00002721203,0.00024790489,0.00006697572,0.054018553],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996044,0.00008131531,0.000011368594,0.000038033762,0.00008771838,0.0001772548],"domain_scores_gemma":[0.99872005,0.00040765703,0.000049487295,0.000065837005,0.00052893226,0.00022804723],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007127805,0.0003371088,0.00040822892,0.00072122837,0.00430781,0.004941839,0.0013845855,0.0012767275,0.0071868915],"category_scores_gemma":[0.0031461525,0.00031830955,0.0002839662,0.0024707643,0.0016434673,0.001843999,0.0013938992,0.0016923171,0.00053029286],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011617526,0.0010771767,0.13989921,0.00039086395,0.00034867306,0.006059627,0.01174549,0.22375526,0.0049530757,0.16057464,0.10560357,0.34443074],"study_design_scores_gemma":[0.00056525605,0.00038692186,0.15512453,0.00083994615,0.0004949353,0.0007626049,0.08508949,0.22826988,0.0074238856,0.1503107,0.37002674,0.00070519676],"about_ca_topic_score_codex":0.98208505,"about_ca_topic_score_gemma":0.9935243,"teacher_disagreement_score":0.027668692,"about_ca_system_score_codex":0.027668692,"about_ca_system_score_gemma":0.026741898,"threshold_uncertainty_score":0.20075136},"labels":[],"label_agreement":null},{"id":"W3133733761","doi":"10.1109/icjece.2020.3039249","title":"Bacterial Foraging Algorithm &amp; Demand Response Programs for a Probabilistic Transmission Expansion Planning With the Consideration of Uncertainties and Voltage Stability Index","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universiti Kuala Lumpur","keywords":"Mathematical optimization; Demand response; Computer science; Electric power system; Probabilistic logic; Stability (learning theory); Closeness; Power (physics); Reliability engineering; Electricity; Engineering; Mathematics","score_opus":0.009931773543117117,"score_gpt":0.18830233180218098,"score_spread":0.17837055825906387,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3133733761","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.042567935,0.00039439288,0.9483357,0.00042042523,0.000048008,0.0000951528,0.00006292924,0.00017206316,0.007903316],"genre_scores_gemma":[0.6954015,0.0004242534,0.2971814,0.00013850351,0.000033423683,0.00050937216,0.00013260449,0.00007665942,0.0061023287],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972373,0.00013079241,0.0000100953375,0.000034358058,0.00005767671,0.000043306256],"domain_scores_gemma":[0.9993331,0.00048366585,0.000056051187,0.000013633511,0.00008556441,0.000027896942],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00077255996,0.0008245666,0.00086212176,0.0004373294,0.00042436263,0.0006633673,0.0006090994,0.0010873962,0.00243444],"category_scores_gemma":[0.0016080406,0.00040248618,0.00057603855,0.0004742004,0.00043117383,0.0004651428,0.00068105845,0.0010011628,0.00019452006],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013891517,0.000014146913,0.00017934773,0.000018032677,0.000011054653,0.00002697493,0.000019408035,0.9888924,0.0002464903,0.002569,0.00019030736,0.007818925],"study_design_scores_gemma":[0.0000036042281,0.0000096181975,0.000023967184,0.0000025855963,0.0000018787522,0.0000030850624,0.0000043691134,0.9990845,0.000052885767,0.0006761887,0.00013609891,0.0000012572801],"about_ca_topic_score_codex":0.008222189,"about_ca_topic_score_gemma":0.005064893,"teacher_disagreement_score":0.008222189,"about_ca_system_score_codex":0.00077243877,"about_ca_system_score_gemma":0.0013761852,"threshold_uncertainty_score":0.01634866},"labels":[],"label_agreement":null},{"id":"W3136221107","doi":"10.2316/journal.203.2015.3.203-6113","title":"OPTIMAL COOPERATIVE DEMAND RESPONSE SCENARIO FOR SYSTEM CONGESTION","year":2015,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Economics; Computer science","score_opus":0.01001062135740102,"score_gpt":0.22701651710335338,"score_spread":0.21700589574595236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3136221107","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86138076,0.00014290183,0.08311255,0.001801869,0.00020095464,0.00032358628,0.0008506282,0.00052565004,0.05166116],"genre_scores_gemma":[0.9965767,0.000011542703,0.0018728529,0.000034338733,0.000006702318,0.000032140855,0.000058710662,0.000014366427,0.0013925615],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896574,0.00043123405,0.00001723425,0.0001363675,0.00008553793,0.00036384646],"domain_scores_gemma":[0.99879104,0.00054094364,0.000070573784,0.00008835051,0.00030077115,0.00020829137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012910598,0.0009693626,0.0013273692,0.00064871844,0.0009018063,0.0016181567,0.001402123,0.0026375917,0.00709076],"category_scores_gemma":[0.0029178704,0.0006204684,0.00085498614,0.00067124906,0.00089488283,0.0015760649,0.0012956804,0.0014281124,0.00050391187],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00068732136,0.00016224736,0.00044766034,0.00005293572,0.000038355014,0.00043738558,0.000073264506,0.9846501,0.0019965954,0.0071711875,0.002070997,0.002211942],"study_design_scores_gemma":[0.00009286492,0.00013430035,0.00035067298,0.0000032679818,0.000022405646,0.000026378055,0.00013352057,0.9959268,0.00035513027,0.002676278,0.00026509207,0.000013400831],"about_ca_topic_score_codex":0.0102600325,"about_ca_topic_score_gemma":0.009370225,"teacher_disagreement_score":0.0102600325,"about_ca_system_score_codex":0.0014663216,"about_ca_system_score_gemma":0.0014922575,"threshold_uncertainty_score":0.02372092},"labels":[],"label_agreement":null},{"id":"W3139226106","doi":"10.1016/j.eneco.2021.105755","title":"Ring the alarm! Electricity markets, renewables, and the pandemic","year":2021,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"Labex Ecodec; Agence Nationale de la Recherche","keywords":"Electricity market; Electricity; Renewable energy; Economics; Revenue; Natural resource economics; Electricity retailing; Business; Market economy; Finance","score_opus":0.0037875430414985463,"score_gpt":0.14895133572216857,"score_spread":0.14516379268067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3139226106","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020153955,0.06476533,0.003572115,0.8010508,0.01744031,0.000009809806,0.00045247172,0.00014759705,0.0924075],"genre_scores_gemma":[0.6915653,0.073013335,0.0024382488,0.12506102,0.026831817,0.000027826214,0.00028211187,0.000201363,0.08057899],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994991,0.0001819288,0.000011178115,0.000052653315,0.00015406973,0.00010109114],"domain_scores_gemma":[0.9984193,0.0008330819,0.00015255845,0.00007967541,0.0002311788,0.00028428997],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001542177,0.00034295802,0.0004733927,0.000514276,0.0010259848,0.0037540742,0.0005208801,0.0040665613,0.020330729],"category_scores_gemma":[0.0073657003,0.00013653068,0.000324749,0.0007693776,0.0023450046,0.006893476,0.0013149086,0.0047219195,0.0019959451],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022886382,0.00008630079,0.0018104066,0.00015549173,0.00002603456,0.0002108507,0.00022749582,0.0021756487,0.0003488206,0.345024,0.57072914,0.07897709],"study_design_scores_gemma":[0.00004133843,0.0000659103,0.003473789,0.00046614703,0.000014851494,0.0002814653,0.0021521985,0.003953197,0.00024479168,0.46867675,0.5205727,0.000056826306],"about_ca_topic_score_codex":0.0032352835,"about_ca_topic_score_gemma":0.0044718664,"teacher_disagreement_score":0.020330729,"about_ca_system_score_codex":0.0012474618,"about_ca_system_score_gemma":0.001221201,"threshold_uncertainty_score":0.06801307},"labels":[],"label_agreement":null},{"id":"W3142141614","doi":"10.1109/ccece.2010.5575104","title":"An overview of the operation of the Alberta electricity market","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Electricity; Electricity market; Electricity retailing; Key (lock); Operator (biology); Electricity system; Industrial organization; Electricity generation; Computer science; Environmental economics; Business; Engineering; Electrical engineering; Economics; Power (physics); Computer security","score_opus":0.008079968415305033,"score_gpt":0.22087068445100574,"score_spread":0.2127907160357007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3142141614","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06675655,0.09505652,0.018014127,0.0081675425,0.00073572446,0.00021300332,0.0038708423,0.00045813335,0.8067275],"genre_scores_gemma":[0.5792381,0.15291955,0.034122013,0.0019450379,0.0011501361,0.000089162364,0.004907432,0.00021202865,0.22541654],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988759,0.00008621084,0.000026570198,0.000065976965,0.00073867204,0.00020665332],"domain_scores_gemma":[0.9995492,0.000045489258,0.00003522285,0.000016425916,0.0002754059,0.00007818467],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060118496,0.00054530863,0.00024087356,0.0031914301,0.0016594802,0.00510548,0.0009934751,0.0008627837,0.0063864263],"category_scores_gemma":[0.0006141072,0.0002881822,0.00024676963,0.0056246724,0.0008636552,0.0012134971,0.0006951168,0.0005731188,0.0008085153],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017628052,0.00014535192,0.022768723,0.000900888,0.00006854652,0.0020437757,0.0016611709,0.04718312,0.006566832,0.28162715,0.14033455,0.4965237],"study_design_scores_gemma":[0.0000102401555,0.000067387504,0.057494327,0.00037582743,0.000033601802,0.0007741494,0.0015970028,0.013541307,0.0010322429,0.019233597,0.9057317,0.000108683016],"about_ca_topic_score_codex":0.76754427,"about_ca_topic_score_gemma":0.85062504,"teacher_disagreement_score":0.23245573,"about_ca_system_score_codex":0.017115926,"about_ca_system_score_gemma":0.015333048,"threshold_uncertainty_score":0.4676494},"labels":[],"label_agreement":null},{"id":"W3143364369","doi":"10.6000/1929-6002.2012.01.02.2","title":"Diffusion of PV in Japan and Germany-Role of Market-Based Incentive and Research and Development (R&amp;D) Investment","year":2012,"lang":"en","type":"article","venue":"Journal of Technology Innovations in Renewable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Incentive; Investment (military); Diffusion; Economics; Business; Market economy; Political science; Physics; Thermodynamics","score_opus":0.015176328058623867,"score_gpt":0.2533914346527432,"score_spread":0.23821510659411935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3143364369","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9987716,0.00020467014,0.00009325132,0.000054153006,0.0000012358505,0.0000034773848,0.00014342887,0.0000023442863,0.00072580855],"genre_scores_gemma":[0.9989807,0.00021237509,0.00009599536,0.00001223243,0.0000018864996,0.000003360334,0.00016680514,0.0000011014113,0.0005253908],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99978834,0.000019761674,0.00001545987,0.000040960727,0.000028704542,0.00010671726],"domain_scores_gemma":[0.9994235,0.00008704448,0.00030271057,0.00001406273,0.0000730186,0.00009965338],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034311513,0.00021651207,0.00021385738,0.0012323287,0.00035239948,0.0009921432,0.00017297188,0.00032136947,0.00086414086],"category_scores_gemma":[0.0006242745,0.00012670911,0.00034716257,0.001545434,0.000325429,0.0009593446,0.00058185897,0.00023316096,0.00009006732],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021958229,0.00015587713,0.9614897,0.000118239965,0.00008314129,0.000956996,0.002837659,0.0034321337,0.0025495468,0.0023332867,0.0005592976,0.025264574],"study_design_scores_gemma":[0.0000062055633,0.000052337055,0.99266595,0.000014111564,0.000046114797,0.00010415,0.0029603748,0.0021386584,0.0006823373,0.00010068297,0.0012160093,0.000013119838],"about_ca_topic_score_codex":0.08023222,"about_ca_topic_score_gemma":0.07813066,"teacher_disagreement_score":0.08023222,"about_ca_system_score_codex":0.0022382257,"about_ca_system_score_gemma":0.00079829094,"threshold_uncertainty_score":0.1595304},"labels":[],"label_agreement":null},{"id":"W3143389206","doi":"10.1109/mper.2002.4312289","title":"Network-Constrained Multiperiod Auction for a Pool-Based Electricity Market","year":2002,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":65,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Electricity market; Computer science; Electricity; Flexibility (engineering); Scheduling (production processes); Transparency (behavior); Operator (biology); Microeconomics; Industrial organization; Operations research; Mathematical optimization; Business; Economics; Operations management; Computer security","score_opus":0.009898701639435133,"score_gpt":0.19670590200704652,"score_spread":0.1868072003676114,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3143389206","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038926322,0.00019887256,0.9461779,0.00026627904,0.000048776637,0.00013790945,0.00015947627,0.0001144624,0.013969991],"genre_scores_gemma":[0.85728407,0.0002545655,0.13247451,0.000086016815,0.000036157715,0.00031130927,0.00012765273,0.00009407855,0.009331608],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989561,0.00059639773,0.00003733245,0.000095837764,0.00018081872,0.00013364956],"domain_scores_gemma":[0.99882287,0.000749756,0.00012225419,0.000086499116,0.00012204521,0.000096538985],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003307774,0.00078969775,0.0012835757,0.0005164428,0.0006967301,0.0019565038,0.0015155944,0.0010882916,0.006165228],"category_scores_gemma":[0.004359854,0.0006687396,0.00087519916,0.0007929349,0.0010213178,0.0028501456,0.0012226909,0.0011927617,0.00051445566],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009331361,0.000035480225,0.00013868077,0.000042624495,0.000022074717,0.00014475909,0.000038579958,0.90497804,0.000637297,0.088759065,0.000644849,0.004465273],"study_design_scores_gemma":[0.0000235734,0.000021554204,0.000045658893,0.0000027370866,0.0000058414403,0.000023285787,0.0000084888115,0.9846224,0.00011292442,0.014578443,0.00054848415,0.0000065678078],"about_ca_topic_score_codex":0.0035812503,"about_ca_topic_score_gemma":0.0032378032,"teacher_disagreement_score":0.006165228,"about_ca_system_score_codex":0.001508185,"about_ca_system_score_gemma":0.0017613657,"threshold_uncertainty_score":0.020624757},"labels":[],"label_agreement":null},{"id":"W3144445876","doi":"10.1049/rpg2.12169","title":"Risk‐adjustable stochastic schedule based on Sobol augmented Latin hypercube sampling considering correlation of wind power uncertainties","year":2021,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Science Foundation of Beijing Municipality; National Natural Science Foundation of China","keywords":"Latin hypercube sampling; Sobol sequence; Schedule; Computer science; Sampling (signal processing); Correlation; Mathematical optimization; Mathematics; Applied mathematics; Monte Carlo method; Statistics","score_opus":0.017731901892717897,"score_gpt":0.21918025193485077,"score_spread":0.20144835004213288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3144445876","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039095156,0.0001165796,0.9584678,0.0000853901,0.000024953095,0.000089135174,0.00006577275,0.00013015594,0.0019250116],"genre_scores_gemma":[0.87315184,0.00015229735,0.12459375,0.00006641872,0.000025564947,0.00030401876,0.00019682088,0.000052409065,0.0014568067],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99898726,0.0006294764,0.000030077526,0.00011530907,0.00015066615,0.00008719563],"domain_scores_gemma":[0.998336,0.0010041734,0.00018474569,0.000098407356,0.0002969758,0.00007977939],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016768393,0.0007720786,0.0007472012,0.00057169265,0.00036078156,0.00063934043,0.0006896336,0.00040013777,0.0020820384],"category_scores_gemma":[0.0032159737,0.00033910453,0.0006283212,0.00057325343,0.00055197807,0.00071753317,0.0007779974,0.0007306569,0.00016721961],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003843416,0.000012915087,0.0003287205,0.000017754503,0.00001337999,0.000028732646,0.00001641666,0.9871553,0.0004351186,0.0048356284,0.0001790445,0.0069385394],"study_design_scores_gemma":[0.000003820541,0.000017185102,0.000052215208,0.0000018038426,0.0000018884521,0.0000035412531,0.00000403791,0.9984004,0.00013265562,0.0012772174,0.00010292542,0.0000023459484],"about_ca_topic_score_codex":0.004242242,"about_ca_topic_score_gemma":0.003090005,"teacher_disagreement_score":0.004242242,"about_ca_system_score_codex":0.00075916405,"about_ca_system_score_gemma":0.0010073761,"threshold_uncertainty_score":0.008868098},"labels":[],"label_agreement":null},{"id":"W3146259529","doi":"","title":"Hydro Québec's distribution vision","year":2009,"lang":"en","type":"article","venue":"CIRED 2009 - The 20th International Conference and Exhibition on Electricity Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Distribution (mathematics); Environmental science; Mathematics","score_opus":0.009952015530038777,"score_gpt":0.2309646674076167,"score_spread":0.22101265187757793,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3146259529","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01035388,0.0045764544,0.008003365,0.038481485,0.0029696731,0.00013636252,0.005994338,0.0013526265,0.9281319],"genre_scores_gemma":[0.059277173,0.0016084549,0.003534321,0.00345232,0.00014042812,0.000039430393,0.0012576772,0.00015219142,0.93053806],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994299,0.00004096944,0.000010531259,0.000073022,0.00030539848,0.0001402455],"domain_scores_gemma":[0.99920446,0.000023408054,0.000021040032,0.000035477795,0.0005637071,0.00015199416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006486032,0.0005859796,0.00029336137,0.0007572038,0.002789104,0.0042883893,0.00086204085,0.0016415548,0.045861702],"category_scores_gemma":[0.0010093615,0.0002592581,0.0003497182,0.0011128051,0.00088042585,0.0009054414,0.00077566924,0.001943779,0.0042295125],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008173985,0.000054167995,0.0022617027,0.00010723167,0.00001815841,0.0004230931,0.0002506672,0.0024222077,0.001249471,0.1064384,0.7821557,0.10453748],"study_design_scores_gemma":[0.00001117013,0.000008035989,0.0017445977,0.00004003918,0.000003158493,0.00005131894,0.00009563094,0.0007902056,0.00017144007,0.0019397965,0.9951332,0.000011423132],"about_ca_topic_score_codex":0.95517343,"about_ca_topic_score_gemma":0.97381955,"teacher_disagreement_score":0.045861702,"about_ca_system_score_codex":0.025985148,"about_ca_system_score_gemma":0.047116876,"threshold_uncertainty_score":0.18853635},"labels":[],"label_agreement":null},{"id":"W3146383562","doi":"10.1109/mper.2002.4312292","title":"On Walrasian Equilibrium for Pool-Based Electricity Markets","year":2002,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Hydro-Québec","funders":"","keywords":"Commodity; Economics; Convergence (economics); Electricity; Electricity market; Market power; Market clearing; Duality (order theory); Mathematical economics; Competition (biology); Microeconomics; Clearing; Mathematical optimization; Balance (ability); Competitive equilibrium; Mathematics; Market economy","score_opus":0.009619603807664,"score_gpt":0.20688318538313322,"score_spread":0.19726358157546922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3146383562","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022794297,0.0021981206,0.9045178,0.0015090441,0.00020768451,0.00007456754,0.00014496034,0.0001277605,0.06842579],"genre_scores_gemma":[0.85611016,0.004581865,0.108603284,0.00059072435,0.0006013198,0.00036090735,0.00018124643,0.00018290435,0.028787645],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9993492,0.0002880147,0.000019658954,0.000084742336,0.00015520465,0.00010312133],"domain_scores_gemma":[0.9993286,0.00035133515,0.00008516886,0.00007378592,0.00010976857,0.000051447987],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015334316,0.00094536686,0.0014260311,0.00073339953,0.0010464021,0.0028536927,0.0016549511,0.0018231961,0.00788385],"category_scores_gemma":[0.003796825,0.00049466616,0.0013668448,0.0011697192,0.0026741286,0.004411707,0.0021362782,0.0019479184,0.0014191124],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013969556,0.00001591603,0.000042861135,0.000028956661,0.000010609989,0.000045852354,0.00005432052,0.08207902,0.00023337167,0.9138698,0.0010401638,0.0025651075],"study_design_scores_gemma":[0.000020360783,0.000019143812,0.00004026617,0.000018073766,0.0000075121548,0.000026003174,0.000018629253,0.27482685,0.00008527447,0.7214803,0.0034433932,0.000014210663],"about_ca_topic_score_codex":0.0029580756,"about_ca_topic_score_gemma":0.002182655,"teacher_disagreement_score":0.00788385,"about_ca_system_score_codex":0.0018528432,"about_ca_system_score_gemma":0.0016320406,"threshold_uncertainty_score":0.026374102},"labels":[],"label_agreement":null},{"id":"W3151022368","doi":"10.1109/mper.2002.4312573","title":"Combined Pool/Bilateral Dispatch, Part II: Curtailment of Firm and Nonfirm Contracts","year":2002,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Bidding; Revenue; Microeconomics; Business; Payment; Industrial organization; Commodity; Economics; Finance","score_opus":0.007814234167380463,"score_gpt":0.18568473576863342,"score_spread":0.17787050160125295,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3151022368","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18245673,0.014652794,0.7378559,0.000876212,0.00025911612,0.0003395305,0.00014871643,0.00023404414,0.06317687],"genre_scores_gemma":[0.93338776,0.0043726685,0.05056182,0.00013466069,0.00017908218,0.00016461677,0.00008971713,0.00005716026,0.01105249],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99863833,0.0006256656,0.000058721467,0.00014431881,0.0004200546,0.00011298496],"domain_scores_gemma":[0.9991486,0.00044963136,0.0001361545,0.000118336524,0.00009554311,0.000051794617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023580235,0.00060493534,0.0008182864,0.0003279824,0.0002472706,0.0015643523,0.0012681041,0.0006512943,0.003562685],"category_scores_gemma":[0.002313927,0.0003214439,0.00049421587,0.0008268992,0.00064873457,0.0025724617,0.00094240764,0.0011166257,0.00033934304],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051205076,0.0002010218,0.0017238925,0.00088000135,0.00026355637,0.00039254175,0.00019522166,0.33657077,0.00908496,0.13860771,0.0033287765,0.50823957],"study_design_scores_gemma":[0.00022422918,0.0010159862,0.0035706265,0.00019721522,0.00015226711,0.00087834004,0.0002058585,0.86197156,0.007888026,0.08717596,0.036654733,0.0000652706],"about_ca_topic_score_codex":0.000763437,"about_ca_topic_score_gemma":0.0010210989,"teacher_disagreement_score":0.003562685,"about_ca_system_score_codex":0.00064174325,"about_ca_system_score_gemma":0.0007500349,"threshold_uncertainty_score":0.012470543},"labels":[],"label_agreement":null},{"id":"W3152578958","doi":"10.1016/j.eneco.2021.105275","title":"On the long-term merit order effect of renewable energies","year":2021,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":91,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Bundesministerium für Wirtschaft und Energie","keywords":"Renewable energy; Economics; Investment (military); Term (time); Portfolio; Electricity; Order (exchange); Renewable portfolio standard; Nameplate capacity; Microeconomics; Environmental economics; Natural resource economics; Electricity generation; Power (physics); Feed-in tariff; Energy policy; Engineering; Financial economics; Finance","score_opus":0.0034681227770886835,"score_gpt":0.16736337752184965,"score_spread":0.16389525474476097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3152578958","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80767596,0.0071421936,0.07505761,0.009770689,0.00078339793,0.000036415215,0.00046038767,0.00021026697,0.098863155],"genre_scores_gemma":[0.98174506,0.0014573755,0.0026647684,0.00023235606,0.00022877028,0.000011737846,0.000071191025,0.000074906275,0.013513864],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99970657,0.000112095244,0.000009061164,0.000027690405,0.00006138178,0.00008317962],"domain_scores_gemma":[0.99198896,0.0061004367,0.0005511372,0.00035246284,0.0006188039,0.00038805202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018502584,0.00038399416,0.0009869937,0.0006510479,0.0006587756,0.001324381,0.0008058878,0.0012549129,0.007117195],"category_scores_gemma":[0.0114549175,0.000277072,0.000514964,0.00048398328,0.0012197446,0.002328529,0.00070147484,0.0017691904,0.00033482112],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048463556,0.0002377834,0.003637468,0.00027435677,0.00009215806,0.00041160663,0.00015609302,0.27774912,0.003973693,0.688863,0.007288294,0.01683189],"study_design_scores_gemma":[0.000048263762,0.00013501279,0.006544445,0.0000731409,0.00005537586,0.00010764322,0.0001760845,0.5283317,0.0016561014,0.459549,0.003268307,0.00005487763],"about_ca_topic_score_codex":0.0049244096,"about_ca_topic_score_gemma":0.0078123435,"teacher_disagreement_score":0.007117195,"about_ca_system_score_codex":0.0014023468,"about_ca_system_score_gemma":0.0013924979,"threshold_uncertainty_score":0.023809373},"labels":[],"label_agreement":null},{"id":"W3153200444","doi":"10.2139/ssrn.3520559","title":"Strategic Storage Use in a Hydro-Thermal Power System with Carbon Constraints","year":2020,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Arbitrage; Renewable energy; Variable renewable energy; Production (economics); Carbon price; Environmental economics; Electricity generation; Thermal energy storage; Software deployment; Electricity; Electricity market; Constraint (computer-aided design); Industrial organization; Business; Economics; Environmental science; Microeconomics; Energy storage; Natural resource economics; Power (physics); Computer science; Engineering; Climate change; Electrical engineering; Finance; Ecology","score_opus":0.00780943222078111,"score_gpt":0.17340735547116912,"score_spread":0.165597923250388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3153200444","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9558821,0.00050963764,0.019410592,0.0010942724,0.0000847375,0.000104537,0.00074496673,0.0001226884,0.022046318],"genre_scores_gemma":[0.99853015,0.00003683665,0.00047485565,0.000009576909,0.0000030246883,0.000006857735,0.000023644718,0.0000051763714,0.0009098419],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996456,0.00013951077,0.000020237876,0.000053278836,0.000043439246,0.000097856006],"domain_scores_gemma":[0.99904186,0.0005443628,0.000082687795,0.00004208961,0.00014755926,0.00014143751],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00089277426,0.0006229244,0.0011544335,0.000547934,0.00072037487,0.0019048261,0.0009675228,0.001395289,0.005404554],"category_scores_gemma":[0.0017167062,0.0005189152,0.0005349536,0.0008027064,0.00077808526,0.0016757805,0.0010203647,0.000774019,0.0002609021],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008533638,0.00016633043,0.00264654,0.00018270368,0.000095381176,0.0010756458,0.00007914944,0.9614358,0.004342932,0.01971381,0.0011989938,0.008209321],"study_design_scores_gemma":[0.00012234857,0.00056064985,0.0026951826,0.000032100936,0.00010381529,0.00015623852,0.00038794716,0.9799871,0.003013487,0.012055511,0.00083756755,0.000048016038],"about_ca_topic_score_codex":0.0068942527,"about_ca_topic_score_gemma":0.012302084,"teacher_disagreement_score":0.0068942527,"about_ca_system_score_codex":0.0014066055,"about_ca_system_score_gemma":0.0013831418,"threshold_uncertainty_score":0.018080056},"labels":[],"label_agreement":null},{"id":"W3161883275","doi":"10.1109/icjece.2021.3059275","title":"A Game Theory Strategy-Based Bidding Evaluation for Power Generation Market","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bidding; Profit (economics); Computer science; Game theory; Mathematical optimization; Particle swarm optimization; Market clearing; Electricity market; Operations research; Microeconomics; Economics; Electricity; Mathematics; Engineering","score_opus":0.010423364650158968,"score_gpt":0.18954318328344774,"score_spread":0.17911981863328877,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3161883275","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17901486,0.00027572096,0.7961564,0.00021202059,0.000059814683,0.00093290454,0.00014653389,0.00018905834,0.02301272],"genre_scores_gemma":[0.9095649,0.000092367074,0.08819797,0.000029425259,0.000009682695,0.0003019181,0.00009419092,0.000022799135,0.0016867309],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99659544,0.0025518045,0.00006906236,0.00012237958,0.00051315327,0.00014819756],"domain_scores_gemma":[0.9961604,0.002903146,0.00011841083,0.00008137544,0.000629005,0.000107704844],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004528578,0.00096977275,0.00088695186,0.0013113681,0.00045730307,0.0016024946,0.00088123116,0.0006168663,0.0029258318],"category_scores_gemma":[0.007751333,0.0003137959,0.00069709914,0.0007331857,0.0005242187,0.0014721055,0.0007339966,0.00060225424,0.0002193749],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031242872,0.00040132029,0.0023855222,0.00019172915,0.00009165376,0.00014892631,0.00017921299,0.8996868,0.0023320233,0.038066678,0.0012376498,0.05496606],"study_design_scores_gemma":[0.000009419271,0.000082676306,0.0001967205,0.0000047611557,0.000007429657,0.000009675104,0.000028660179,0.99745613,0.00022174418,0.001828501,0.00014882955,0.000005463843],"about_ca_topic_score_codex":0.0074486686,"about_ca_topic_score_gemma":0.006026866,"teacher_disagreement_score":0.0074486686,"about_ca_system_score_codex":0.0019902731,"about_ca_system_score_gemma":0.0017050584,"threshold_uncertainty_score":0.023949742},"labels":[],"label_agreement":null},{"id":"W3162671986","doi":"10.1109/tpwrs.2021.3081557","title":"Sample Robust Scheduling of Electricity-Gas Systems Under Wind Power Uncertainty","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"National Key Research and Development Program of China Stem Cell and Translational Research; State Grid Corporation of China","keywords":"Wind power; Electricity; Power to gas; Environmental science; Scheduling (production processes); Sample (material); Computer science; Engineering; Operations management; Electrical engineering; Physics","score_opus":0.013259328146863168,"score_gpt":0.20885966650124116,"score_spread":0.19560033835437798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3162671986","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.086760744,0.00031426907,0.9082979,0.00037148278,0.000052785414,0.000113244474,0.00021931464,0.00025798386,0.0036122613],"genre_scores_gemma":[0.96803534,0.00015426228,0.029995626,0.000042740212,0.000024878418,0.00009364675,0.00015798889,0.000055316224,0.0014401263],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992231,0.00033842822,0.00003185553,0.0001557195,0.00012603684,0.00012494836],"domain_scores_gemma":[0.998078,0.0013120818,0.00030817697,0.00006762793,0.00013729933,0.00009683836],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001865015,0.0011414276,0.0013098564,0.0003452611,0.0003443417,0.00095996313,0.00093026384,0.00077258714,0.0018776093],"category_scores_gemma":[0.0041339975,0.0006171004,0.0006094513,0.0005710756,0.00077092065,0.0010316619,0.00089727703,0.0011848565,0.00017106808],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031283536,0.000008238818,0.00008933643,0.00001427925,0.000008031405,0.000017404123,0.000007001669,0.99546695,0.00011543763,0.0021319152,0.00009565097,0.0020145308],"study_design_scores_gemma":[0.0000047484777,0.000010015754,0.00004368685,9.078416e-7,0.0000018167908,0.0000014905087,0.0000027114029,0.9986565,0.00006594763,0.0011661476,0.000044592533,0.0000014208813],"about_ca_topic_score_codex":0.0100757135,"about_ca_topic_score_gemma":0.006532002,"teacher_disagreement_score":0.0100757135,"about_ca_system_score_codex":0.0012882395,"about_ca_system_score_gemma":0.0014066658,"threshold_uncertainty_score":0.020034134},"labels":[],"label_agreement":null},{"id":"W3165363420","doi":"10.1186/s43067-020-00026-3","title":"A meliorated Harris Hawks optimizer for combinatorial unit commitment problem with photovoltaic applications","year":2021,"lang":"en","type":"article","venue":"Journal of Electrical Systems and Information Technology","topic":"Electric Power System Optimization","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"University of Calgary","keywords":"Mathematical optimization; Schedule; Photovoltaic system; Computer science; Electric power system; Electricity generation; Wind power; Electric power; Optimization problem; Power (physics); Engineering; Electrical engineering; Mathematics","score_opus":0.0045689881953801924,"score_gpt":0.19563350985833197,"score_spread":0.1910645216629518,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3165363420","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13949645,0.00081464904,0.8457277,0.0004962711,0.00015822028,0.00015993288,0.00012603142,0.0003496325,0.01267118],"genre_scores_gemma":[0.89395136,0.00020089958,0.10064498,0.00012763782,0.000056822235,0.00012642828,0.00011039602,0.000045868044,0.0047355955],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99974996,0.000098371616,0.000013492362,0.00004987299,0.00005466012,0.00003358138],"domain_scores_gemma":[0.999708,0.00014850071,0.00003279671,0.000015191616,0.00006860945,0.000026888916],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006584031,0.00062479085,0.0007302966,0.00039262243,0.00030036768,0.00076628476,0.0007829757,0.000677302,0.0024212983],"category_scores_gemma":[0.0010732772,0.0002737616,0.0004020636,0.00048270408,0.00038996318,0.00042549157,0.00045911418,0.0006186093,0.0001823247],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007267577,0.000047798265,0.000556085,0.00005804627,0.00004326037,0.00006279615,0.000022128024,0.9648816,0.0015358313,0.0043952563,0.0011550873,0.027169345],"study_design_scores_gemma":[0.00000733941,0.000029329376,0.000058241767,0.000002114609,0.0000033448957,0.0000071136537,0.0000039868305,0.99906987,0.00017415461,0.00048239916,0.0001605641,0.0000015936488],"about_ca_topic_score_codex":0.0041829073,"about_ca_topic_score_gemma":0.0029191275,"teacher_disagreement_score":0.0041829073,"about_ca_system_score_codex":0.00058893254,"about_ca_system_score_gemma":0.00075471343,"threshold_uncertainty_score":0.008317113},"labels":[],"label_agreement":null},{"id":"W3169373037","doi":"10.1109/access.2021.3085819","title":"A Modified Hybrid Particle Swarm Optimization With Bat Algorithm Parameter Inspired Acceleration Coefficients for Solving Eco-Friendly and Economic Dispatch Problems","year":2021,"lang":"en","type":"article","venue":"IEEE Access","topic":"Electric Power System Optimization","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Particle swarm optimization; Economic dispatch; Computer science; Mathematical optimization; Convergence (economics); Electric power system; Algorithm; Hybrid algorithm (constraint satisfaction); Metaheuristic; Acceleration; Renewable energy; Hybrid power; Power (physics); Engineering; Mathematics","score_opus":0.0156128917803038,"score_gpt":0.23555998930356029,"score_spread":0.21994709752325647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3169373037","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011783728,0.00036136142,0.9830504,0.000115228504,0.00010754448,0.000079180514,0.000030435938,0.00019797498,0.0042741233],"genre_scores_gemma":[0.3818606,0.0005554289,0.61128986,0.00015189812,0.00010232189,0.00054486055,0.00020766168,0.00009321553,0.0051941047],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972886,0.00008387993,0.000013576296,0.00003777709,0.00010923492,0.000026558799],"domain_scores_gemma":[0.9997453,0.00011413005,0.000024786144,0.000017176753,0.00007851094,0.00002001039],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052913337,0.00081593095,0.0006486724,0.000497942,0.00035925137,0.00069066556,0.0007696577,0.0007533402,0.0014031549],"category_scores_gemma":[0.0009576186,0.00030944182,0.0006569067,0.00059081713,0.00033213786,0.0005122264,0.000616941,0.0008096529,0.00037034793],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006348763,0.000057333807,0.00064265257,0.00012387635,0.000074564174,0.000066572225,0.0000601963,0.88995695,0.004101347,0.009368449,0.0015268566,0.093957596],"study_design_scores_gemma":[0.0000144304995,0.000039960636,0.000114915594,0.000005722069,0.0000056471968,0.000017217993,0.000006760976,0.9970055,0.0004114177,0.0009056803,0.0014673895,0.0000053871336],"about_ca_topic_score_codex":0.0033515287,"about_ca_topic_score_gemma":0.0026890312,"teacher_disagreement_score":0.0033515287,"about_ca_system_score_codex":0.00027601287,"about_ca_system_score_gemma":0.00085566787,"threshold_uncertainty_score":0.0066640377},"labels":[],"label_agreement":null},{"id":"W3171241085","doi":"10.1016/j.cor.2021.105398","title":"Chance constrained unit commitment approximation under stochastic wind energy","year":2021,"lang":"en","type":"article","venue":"Computers & Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Laurentian University","funders":"National Science Foundation","keywords":"Mathematical optimization; Wind power; Computer science; Intermittency; Power system simulation; Time horizon; Renewable energy; Scheduling (production processes); Electric power system; Power (physics); Mathematics; Engineering; Electrical engineering","score_opus":0.04731758283479383,"score_gpt":0.30431309412673535,"score_spread":0.25699551129194154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3171241085","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07166197,0.0010591664,0.9093919,0.0013219935,0.0003300313,0.000082022896,0.0003329165,0.00029278273,0.01552725],"genre_scores_gemma":[0.9458905,0.00048507995,0.043957733,0.00022634298,0.00015895523,0.0001590077,0.00025994366,0.00013631774,0.008726233],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992418,0.00039566518,0.000028633422,0.00009245961,0.0001384773,0.00010295765],"domain_scores_gemma":[0.9955481,0.0036170078,0.00029712645,0.00014677801,0.00024367246,0.00014725149],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021811414,0.0008258589,0.0022605406,0.00053514104,0.00044153293,0.0018029219,0.0017571445,0.002045326,0.004671683],"category_scores_gemma":[0.008081195,0.0013390363,0.00079681765,0.0013433844,0.0009680815,0.0016086441,0.001078339,0.0018751721,0.00037154852],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001660202,0.000004817045,0.00007521822,0.00001426167,0.000011425941,0.00002275234,0.000004846277,0.99235535,0.000033690816,0.0061053536,0.00026700814,0.0010886475],"study_design_scores_gemma":[0.0000021952792,0.0000021047206,0.000016174885,0.0000021604183,0.0000011538658,0.0000018108905,0.0000011516178,0.998408,0.00001160592,0.0015221571,0.000030387204,0.0000010974298],"about_ca_topic_score_codex":0.010040712,"about_ca_topic_score_gemma":0.0076950826,"teacher_disagreement_score":0.010040712,"about_ca_system_score_codex":0.0012329216,"about_ca_system_score_gemma":0.0013497993,"threshold_uncertainty_score":0.019964516},"labels":[],"label_agreement":null},{"id":"W3173726148","doi":"10.1016/j.eneco.2021.105390","title":"Microeconomic models of electricity storage: Price Forecasting, arbitrage limits, curtailment insurance, and transmission line utilization","year":2021,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"University of British Columbia","keywords":"Arbitrage; Economics; Electricity; Profitability index; Electricity market; Microeconomics; Energy storage; Power (physics); Financial economics; Finance; Engineering","score_opus":0.020404915434040074,"score_gpt":0.19116660933957436,"score_spread":0.17076169390553428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3173726148","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.479168,0.007798184,0.453441,0.019816179,0.0006016036,0.00011910627,0.0018580678,0.00043825564,0.036759585],"genre_scores_gemma":[0.98787075,0.001098036,0.0033735526,0.00010922161,0.00012965563,0.0000362256,0.00014689863,0.000029255807,0.0072064237],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99947065,0.0002707187,0.000020098978,0.00009153272,0.000064081985,0.00008289498],"domain_scores_gemma":[0.9967173,0.002339034,0.0004462556,0.00010329474,0.00024804348,0.00014600759],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018182063,0.0008702671,0.0011654928,0.0006511109,0.00048501894,0.0027794866,0.001996975,0.002471994,0.003630865],"category_scores_gemma":[0.007901835,0.00082237774,0.0006246015,0.0012873325,0.0015495443,0.0037877006,0.00077691127,0.0020912148,0.00029987926],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033993532,0.000027179554,0.00057296845,0.00001879243,0.000018148516,0.0000391981,0.000019141342,0.96318936,0.00012969165,0.03316783,0.00088556926,0.0018981358],"study_design_scores_gemma":[0.000005403414,0.0000054633815,0.00020002991,0.0000032107916,0.000004248884,0.0000060145703,0.0000079736055,0.985816,0.000028210932,0.013779041,0.0001392221,0.000005110598],"about_ca_topic_score_codex":0.015400298,"about_ca_topic_score_gemma":0.011965737,"teacher_disagreement_score":0.015400298,"about_ca_system_score_codex":0.0022426674,"about_ca_system_score_gemma":0.0014952323,"threshold_uncertainty_score":0.03062129},"labels":[],"label_agreement":null},{"id":"W3184426318","doi":"","title":"Net metering in British Columbia : white paper","year":2003,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"White (mutation); White paper; Metering mode; Geography; Engineering; Archaeology","score_opus":0.0035495143888863104,"score_gpt":0.1593074587334295,"score_spread":0.15575794434454318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3184426318","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.58571553,0.0049302573,0.002925709,0.046802077,0.0011209106,0.00009561655,0.05319646,0.0006466853,0.30456668],"genre_scores_gemma":[0.7484651,0.0021480378,0.0011623222,0.0012166584,0.00010242779,0.000023555627,0.009112025,0.0001739367,0.23759593],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995098,0.0000388438,0.000018151146,0.00007170337,0.00020799608,0.00015348419],"domain_scores_gemma":[0.9982875,0.00014818934,0.00009580459,0.00006034972,0.0011837687,0.00022436395],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005192195,0.00032368483,0.0003218536,0.0012676808,0.0014327466,0.0024484221,0.0009117902,0.00076024595,0.009777872],"category_scores_gemma":[0.0026085416,0.0002538636,0.00017256926,0.0035760265,0.00039924643,0.0008085623,0.00058348506,0.0010818065,0.0011262397],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00049361394,0.00017039866,0.22394766,0.0002449836,0.000108240216,0.00059774437,0.000762653,0.016669404,0.0011404362,0.012562176,0.57061774,0.17268492],"study_design_scores_gemma":[0.000068641726,0.000060267488,0.66213375,0.00028372492,0.00016729877,0.00016002689,0.0049461536,0.027729576,0.0025273734,0.0041403743,0.2977039,0.00007895229],"about_ca_topic_score_codex":0.97684866,"about_ca_topic_score_gemma":0.99426633,"teacher_disagreement_score":0.023151338,"about_ca_system_score_codex":0.020231785,"about_ca_system_score_gemma":0.02707906,"threshold_uncertainty_score":0.14679253},"labels":[],"label_agreement":null},{"id":"W3191335747","doi":"10.1109/tpwrs.2021.3100782","title":"An Incentive Compatible Iterative Mechanism for Coupling Electricity Markets","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"National Science Foundation of Sri Lanka","keywords":"Market clearing; Electricity market; Incentive; Incentive compatibility; Electricity; Microeconomics; Nash equilibrium; Marginal cost; Clearing; Economics; Market mechanism; Market power; Computer science; Mathematical optimization; Monopoly; Engineering; Market economy; Finance","score_opus":0.009862835102707905,"score_gpt":0.227486651815169,"score_spread":0.2176238167124611,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3191335747","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03796841,0.00006704139,0.95761853,0.00017127032,0.00003405531,0.00018025894,0.000037986734,0.0003902638,0.003532144],"genre_scores_gemma":[0.8280045,0.00008304052,0.1682726,0.00009073084,0.000044189088,0.00043557113,0.000042746084,0.00004153065,0.0029850344],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9963251,0.0019155816,0.00019234467,0.000590513,0.0007015374,0.00027496665],"domain_scores_gemma":[0.9948468,0.0025765803,0.0009879046,0.0008092421,0.0004993297,0.00028022708],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0043715998,0.0007670866,0.0009923012,0.0006353114,0.0006929936,0.0013320398,0.0026693703,0.0015400647,0.003172737],"category_scores_gemma":[0.010338393,0.00050664996,0.0007064568,0.0007291211,0.0016255428,0.0026835238,0.0026351796,0.0015039121,0.00036308749],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042809107,0.00033407638,0.0011054896,0.00020160407,0.00016918698,0.00051569403,0.0006024344,0.5666191,0.018335307,0.33547696,0.0016628742,0.07454907],"study_design_scores_gemma":[0.00021978754,0.0002760929,0.00018685925,0.000016007392,0.000028727127,0.00015793547,0.000038458373,0.8993446,0.0035194007,0.09345257,0.0027115927,0.000048032187],"about_ca_topic_score_codex":0.0006905513,"about_ca_topic_score_gemma":0.00054763193,"teacher_disagreement_score":0.0043715998,"about_ca_system_score_codex":0.0007105691,"about_ca_system_score_gemma":0.0014614816,"threshold_uncertainty_score":0.02311951},"labels":[],"label_agreement":null},{"id":"W3198143394","doi":"10.1109/icecce52056.2021.9514130","title":"A Modified Ant Lion Optimization Technique for Economic Emission Dispatch Including Biomass","year":2021,"lang":"en","type":"article","venue":"2021 International Conference on Electrical, Communication, and Computer Engineering (ICECCE)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Electricity generation; Biomass (ecology); Fossil fuel; Economic dispatch; Simulated annealing; Automotive engineering; Schedule; Electric power system; Environmental science; Thermal power station; Computer science; Process engineering; Power (physics); Engineering; Electrical engineering; Waste management; Algorithm; Ecology","score_opus":0.02042009838245781,"score_gpt":0.25039318737159216,"score_spread":0.22997308898913435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3198143394","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012080524,0.000099986864,0.9832171,0.00010596613,0.00004859707,0.00006754574,0.000028125613,0.00016025316,0.004191835],"genre_scores_gemma":[0.4960586,0.00021352738,0.49606928,0.00013275829,0.00004578449,0.0004215452,0.00012562495,0.00013003316,0.0068028276],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975806,0.000095278905,0.000010586585,0.000031580217,0.00008576145,0.000018638992],"domain_scores_gemma":[0.9997818,0.00011238617,0.00003341862,0.000013662729,0.000047129244,0.0000117675445],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042999577,0.0008507375,0.0005925072,0.00045606587,0.00031674176,0.00048532162,0.0007055407,0.0005411735,0.002077052],"category_scores_gemma":[0.00073254557,0.00032553793,0.00045702982,0.00058127777,0.0003431441,0.0005559105,0.0004860582,0.0007274935,0.00033386104],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005931972,0.000046793833,0.00030564965,0.000060990693,0.000029540235,0.000040688043,0.00003145406,0.94120204,0.0030207217,0.0061382353,0.0006460956,0.04841837],"study_design_scores_gemma":[0.000008130304,0.000024486553,0.00004764235,0.0000019758995,0.0000029810021,0.0000071645068,0.0000026707621,0.99839574,0.0002699349,0.0007043923,0.00053240324,0.000002501776],"about_ca_topic_score_codex":0.0025490073,"about_ca_topic_score_gemma":0.0038276224,"teacher_disagreement_score":0.0025490073,"about_ca_system_score_codex":0.0004734403,"about_ca_system_score_gemma":0.0006327674,"threshold_uncertainty_score":0.0069484115},"labels":[],"label_agreement":null},{"id":"W3202479321","doi":"10.2139/ssrn.3936984","title":"Private Risk and Social Resilience in Liberalized Electricity Markets","year":2021,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Resilience (materials science); Business; Electricity; Economics; Natural resource economics","score_opus":0.0031351949199745228,"score_gpt":0.1963774557806966,"score_spread":0.19324226086072208,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3202479321","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97469443,0.0002083856,0.008908471,0.0033268228,0.000027740103,0.0000110546325,0.00009022163,0.000028112263,0.012704908],"genre_scores_gemma":[0.9994629,0.000035297144,0.0000633249,0.000017611172,0.000006666386,0.0000016066128,0.000005365437,0.0000014341581,0.00040564826],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9996271,0.0001300285,0.000011829382,0.000047770394,0.00003455607,0.0001486559],"domain_scores_gemma":[0.9970752,0.0014713997,0.0007690557,0.00017236885,0.00014210772,0.00036979117],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010372506,0.00023869255,0.0005272904,0.00048187288,0.00071887946,0.0022573576,0.00043632215,0.000989468,0.004566237],"category_scores_gemma":[0.006108683,0.00018219576,0.00034931602,0.00046350493,0.0028582935,0.0028152596,0.0018119937,0.001319675,0.00010834257],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004831108,0.000201477,0.026504472,0.00008266557,0.00016716353,0.0009435174,0.00085672445,0.26264992,0.0011214658,0.687947,0.0032601925,0.015782239],"study_design_scores_gemma":[0.000044681048,0.000089532325,0.01472445,0.00002716981,0.000031824668,0.00009941335,0.0016338398,0.10262282,0.0001944942,0.8795702,0.0009318848,0.000029615374],"about_ca_topic_score_codex":0.0040225396,"about_ca_topic_score_gemma":0.0050880928,"teacher_disagreement_score":0.004566237,"about_ca_system_score_codex":0.0012223334,"about_ca_system_score_gemma":0.0007640765,"threshold_uncertainty_score":0.015275538},"labels":[],"label_agreement":null},{"id":"W3209711571","doi":"10.35833/mpce.2020.000580","title":"Dynamic-decision-based Real-time Dispatch for Reducing Constraint Violations","year":2022,"lang":"en","type":"article","venue":"Journal of Modern Power Systems and Clean Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Economic dispatch; Constraint (computer-aided design); Process (computing); Computer science; Electric power system; Point (geometry); Identification (biology); Moment (physics); Mathematical optimization; Power (physics); Operations research; Engineering; Mathematics","score_opus":0.004726863144434747,"score_gpt":0.20273304703731346,"score_spread":0.19800618389287872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3209711571","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008759126,0.0001413523,0.988342,0.00008542592,0.000044594603,0.000035392513,0.000026791318,0.00026194283,0.002303462],"genre_scores_gemma":[0.7873552,0.00015749286,0.20941782,0.00010456735,0.000057874047,0.00011568204,0.00012889091,0.000102672435,0.0025598258],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989262,0.0002915635,0.00006186003,0.00023956888,0.00035514322,0.00012567514],"domain_scores_gemma":[0.9992969,0.00027410945,0.00013852971,0.0000512108,0.00018196194,0.000057356167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010475777,0.0010967829,0.0010072793,0.0005514336,0.0005427509,0.00096673815,0.0014652803,0.0004987476,0.0022227194],"category_scores_gemma":[0.0015108509,0.0004233021,0.00044368644,0.00066363695,0.00044917906,0.0011298766,0.0007916051,0.0011451287,0.0003424372],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002032076,0.0001413242,0.00038619476,0.00010426369,0.000053350537,0.00010141305,0.000080793325,0.8466311,0.00789145,0.015950948,0.0023012005,0.12615475],"study_design_scores_gemma":[0.000013626503,0.000023509281,0.000059219397,0.0000024704605,0.0000042294496,0.000010062799,0.000003735289,0.99742573,0.0007925168,0.0011474567,0.0005106402,0.0000066448406],"about_ca_topic_score_codex":0.0032085977,"about_ca_topic_score_gemma":0.0034158619,"teacher_disagreement_score":0.0032085977,"about_ca_system_score_codex":0.00075828476,"about_ca_system_score_gemma":0.0014957564,"threshold_uncertainty_score":0.007435739},"labels":[],"label_agreement":null},{"id":"W3212804852","doi":"10.1109/iecon48115.2021.9589362","title":"Distributed Economic Dispatch over Strongly Connected Communication Networks","year":2021,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Economic dispatch; Benchmark (surveying); Computer science; Electric power system; Telecommunications network; Distributed algorithm; Mathematical optimization; Control (management); Power (physics); Distributed computing; Computer network; Mathematics","score_opus":0.00390533302642488,"score_gpt":0.18839326249301053,"score_spread":0.18448792946658565,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3212804852","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0917195,0.00033779952,0.9020716,0.00052627595,0.00006580847,0.00005363381,0.00005189308,0.000106004314,0.0050674644],"genre_scores_gemma":[0.96225995,0.00031671024,0.0345198,0.000052221643,0.000049704184,0.00009966073,0.000069618734,0.000024227258,0.0026082203],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99893457,0.00058226916,0.0000342197,0.00014886321,0.00021794192,0.00008215161],"domain_scores_gemma":[0.99798656,0.0014976915,0.00017294695,0.000087084605,0.00017955292,0.00007619233],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013218593,0.0009214081,0.00091904216,0.00051987515,0.00062126404,0.0011494785,0.000934203,0.0010702453,0.0013581275],"category_scores_gemma":[0.0042138626,0.00039095888,0.0003047777,0.0010997137,0.0011044471,0.0017822998,0.001325023,0.0012833062,0.00018827467],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004454797,0.000010887099,0.0001069834,0.000015726822,0.00000876627,0.000040355077,0.000015463036,0.9807413,0.00039556352,0.012732127,0.00022227067,0.005666013],"study_design_scores_gemma":[0.0000103463435,0.000008352373,0.000027004893,8.6014086e-7,0.0000010268242,0.0000039701986,0.0000037297095,0.99106395,0.000101281636,0.0086553395,0.00012274168,0.0000014386554],"about_ca_topic_score_codex":0.0015122851,"about_ca_topic_score_gemma":0.0012195383,"teacher_disagreement_score":0.0015122851,"about_ca_system_score_codex":0.0010083627,"about_ca_system_score_gemma":0.000685768,"threshold_uncertainty_score":0.0073162317},"labels":[],"label_agreement":null},{"id":"W3215277578","doi":"10.32920/ryerson.14664810.v1","title":"Security Constrained Stochastic Power System Scheduling Algorithms - With Wind Electric Generators","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; University of New Brunswick","funders":"","keywords":"Probabilistic logic; Electric power system; Wind power; Mathematical optimization; Scheduling (production processes); Computer science; Economic dispatch; Power system simulation; Power (physics); Transmission (telecommunications); Transmission system; Engineering; Reliability engineering; Control theory (sociology); Electrical engineering; Mathematics; Telecommunications","score_opus":0.005058629449334553,"score_gpt":0.1879276741785331,"score_spread":0.18286904472919854,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3215277578","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03186525,0.0004198384,0.96089756,0.0004989945,0.00007452395,0.000101339916,0.0002213596,0.0003975487,0.005523587],"genre_scores_gemma":[0.7183939,0.00051935855,0.273018,0.00022685135,0.000107182546,0.00033319052,0.00056247466,0.00021490887,0.0066240765],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938846,0.00024660266,0.000029016757,0.00012369172,0.00011006269,0.000102075974],"domain_scores_gemma":[0.9983322,0.0011266476,0.00017069066,0.00009218403,0.00018122648,0.0000971048],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014116243,0.0011001629,0.0012741837,0.0004232454,0.0004496743,0.0012503755,0.001292972,0.00094955723,0.0039255316],"category_scores_gemma":[0.004015523,0.0008220197,0.0007398659,0.0009367383,0.0005921622,0.001121676,0.0012172794,0.0014564977,0.000568745],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002825173,0.000012558671,0.00016198706,0.000015698355,0.000010095199,0.000013759803,0.000012849297,0.98727566,0.00009011614,0.005520512,0.0004004113,0.006458101],"study_design_scores_gemma":[0.0000052002124,0.0000040038344,0.00001237469,0.0000017564439,0.0000010639603,0.0000014687259,0.0000024189947,0.99750924,0.000021971668,0.0023451797,0.00009471302,6.696294e-7],"about_ca_topic_score_codex":0.009400477,"about_ca_topic_score_gemma":0.008982282,"teacher_disagreement_score":0.009400477,"about_ca_system_score_codex":0.0013546635,"about_ca_system_score_gemma":0.0022331954,"threshold_uncertainty_score":0.01869154},"labels":[],"label_agreement":null},{"id":"W3215510528","doi":"10.1111/poms.13624","title":"Why do Energy Markets in Europe Rely on One Instrument?","year":2021,"lang":"en","type":"article","venue":"Production and Operations Management","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Futures contract; Spot contract; Electricity; Forward contract; Normal backwardation; Forward market; Microeconomics; Derivative (finance); Business; Economics; Spot market; Variance (accounting); Hedge; Industrial organization; Financial economics","score_opus":0.007990211478247826,"score_gpt":0.18141755774295096,"score_spread":0.17342734626470313,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3215510528","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22099316,0.035153743,0.07190828,0.06871306,0.0021065965,0.00013731442,0.0012806017,0.0008394331,0.59886783],"genre_scores_gemma":[0.96039385,0.005448197,0.006289643,0.008889757,0.0005443523,0.00008090241,0.00029914046,0.00017624546,0.017877806],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9977316,0.000569142,0.00011432689,0.0006021229,0.00053570577,0.00044711636],"domain_scores_gemma":[0.9975465,0.000717522,0.00056592346,0.000468491,0.00042958118,0.00027207896],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033230486,0.00051767443,0.0010266482,0.0019056367,0.0016168462,0.009723896,0.0012642231,0.0050756503,0.014747822],"category_scores_gemma":[0.010488413,0.00040991607,0.0011567093,0.0027716614,0.0051807277,0.016721379,0.0037543809,0.0034393885,0.0020654171],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000074750686,0.000049499246,0.004932285,0.000097234864,0.00006414628,0.00013047733,0.00034712855,0.0019199387,0.00021776595,0.9444023,0.007678059,0.040086355],"study_design_scores_gemma":[0.00012340327,0.000079177255,0.013828039,0.00044641775,0.000069631344,0.0003232196,0.0013232396,0.003895077,0.00053319876,0.8048498,0.17443644,0.00009245316],"about_ca_topic_score_codex":0.0045649284,"about_ca_topic_score_gemma":0.0025088738,"teacher_disagreement_score":0.014747822,"about_ca_system_score_codex":0.0022292954,"about_ca_system_score_gemma":0.0017308927,"threshold_uncertainty_score":0.049336374},"labels":[],"label_agreement":null},{"id":"W3216244546","doi":"","title":"Eléctrica pública: ¿una utopía?","year":2021,"lang":"es","type":"article","venue":"Alternativas económicas/Alternativas económicas","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Political science; Humanities; Art","score_opus":0.01036479955149681,"score_gpt":0.24857700956125192,"score_spread":0.23821221000975512,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3216244546","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003988151,0.031774048,0.0015753659,0.8375217,0.004714313,0.000008833988,0.00014871631,0.000069105045,0.12019975],"genre_scores_gemma":[0.5403118,0.09884033,0.0020181695,0.23215334,0.013784559,0.000053682168,0.00029387992,0.00027350883,0.11227072],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99677116,0.0011558523,0.00005569484,0.00040105564,0.0011487548,0.0004673498],"domain_scores_gemma":[0.9936879,0.0028928954,0.00052082894,0.0005374013,0.0018688048,0.00049212103],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006764825,0.00046261304,0.0005495889,0.0011632533,0.002306336,0.014499477,0.001169117,0.007326994,0.019048676],"category_scores_gemma":[0.013157386,0.00021154099,0.00042104415,0.0024450924,0.009938432,0.013642437,0.0028190021,0.008215896,0.0027096856],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009647146,0.000053629672,0.00082901935,0.00041945642,0.000030823725,0.00011547247,0.0012086463,0.0004515918,0.00024241248,0.71527076,0.20019934,0.08108246],"study_design_scores_gemma":[0.000030300262,0.000026752996,0.0011403492,0.0010891557,0.00003074131,0.0001025158,0.0028389597,0.0002533707,0.00027447214,0.14275116,0.85144526,0.000016930351],"about_ca_topic_score_codex":0.017754951,"about_ca_topic_score_gemma":0.01574364,"teacher_disagreement_score":0.019048676,"about_ca_system_score_codex":0.007295971,"about_ca_system_score_gemma":0.010294386,"threshold_uncertainty_score":0.0637241},"labels":[],"label_agreement":null},{"id":"W328099773","doi":"10.15173/esr.v21i1.2530","title":"PRICE CONVERGENCE AND INTEGRATION IN THE GERMANY, FRANCE AND ITALY ELECTRICITY MARKETS","year":2015,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cointegration; Convergence (economics); Economics; Electricity; Market integration; Electricity market; Econometrics; Empirical evidence; Electricity price; Macroeconomics; Economy; Financial economics; Engineering","score_opus":0.018165888250974146,"score_gpt":0.24934275530980216,"score_spread":0.231176867058828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W328099773","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98477465,0.0061253607,0.0013552781,0.00029093155,0.0000080471855,0.0000055670566,0.000075913,0.000010281647,0.007353931],"genre_scores_gemma":[0.9974075,0.0015777912,0.00035573167,0.000014415888,0.000012007868,0.0000022609372,0.0000834913,0.0000027991205,0.00054397545],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9997136,0.00007810496,0.000018399567,0.000045900255,0.00009500982,0.00004900397],"domain_scores_gemma":[0.99963975,0.000098984,0.00016813514,0.000014714245,0.00006188096,0.000016511656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00087179994,0.00016539756,0.00026736656,0.0012413923,0.00014645404,0.0009778109,0.00020355989,0.00035002624,0.0008755332],"category_scores_gemma":[0.0017915402,0.00008629524,0.0003106191,0.0018803369,0.0003870001,0.0010150722,0.0003762591,0.0002600131,0.00010771872],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009673322,0.00024909017,0.4588407,0.00057605456,0.00062124693,0.004139508,0.0033063933,0.09810505,0.007524638,0.07807782,0.004207127,0.3433852],"study_design_scores_gemma":[0.000032719545,0.00018997441,0.945916,0.00017788027,0.00019034909,0.0007107005,0.0013484912,0.034037177,0.0015016866,0.005806474,0.010049028,0.000039474606],"about_ca_topic_score_codex":0.007202672,"about_ca_topic_score_gemma":0.0047349217,"teacher_disagreement_score":0.007202672,"about_ca_system_score_codex":0.0007336547,"about_ca_system_score_gemma":0.00031873648,"threshold_uncertainty_score":0.014321506},"labels":[],"label_agreement":null},{"id":"W35495929","doi":"10.15173/esr.v14i2.495","title":"The Liberalisation of the Continental European Electricity Market - Lessons Learned","year":2006,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Liberalization; Competition (biology); Electricity market; Electricity; Margin (machine learning); Economics; Business; Mains electricity; International economics; Market economy; Industrial organization; Natural resource economics; Engineering; Computer science","score_opus":0.021071438727416077,"score_gpt":0.24992333497783992,"score_spread":0.22885189625042385,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W35495929","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18728988,0.4385286,0.02261783,0.053886168,0.0012851707,0.000030848536,0.00018674869,0.0000739304,0.29610088],"genre_scores_gemma":[0.8458092,0.12576208,0.009010488,0.0038592124,0.00051129377,0.000015193225,0.00013050828,0.0000192156,0.01488277],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9994535,0.000175731,0.000029856195,0.00008976454,0.00014772794,0.000103355305],"domain_scores_gemma":[0.9995079,0.00022354383,0.000052970983,0.000047774858,0.00011218151,0.000055507662],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001799489,0.0003205943,0.00047672648,0.00039438103,0.00039933587,0.0032479311,0.00068073114,0.0017149615,0.0025977409],"category_scores_gemma":[0.0016857481,0.0001419841,0.000334696,0.0008400021,0.001187389,0.002739317,0.0010653487,0.0015269745,0.00030088905],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012502485,0.00009342592,0.0017965168,0.00057821214,0.00004273815,0.0004912704,0.00023489873,0.028988589,0.001155878,0.7064007,0.0073957075,0.25269705],"study_design_scores_gemma":[0.00004312475,0.00020798584,0.010406296,0.001146029,0.000032492997,0.00056554715,0.0013194255,0.013586869,0.0021543067,0.3717149,0.59876055,0.00006241235],"about_ca_topic_score_codex":0.005278484,"about_ca_topic_score_gemma":0.00618542,"teacher_disagreement_score":0.005278484,"about_ca_system_score_codex":0.0015610704,"about_ca_system_score_gemma":0.0014540858,"threshold_uncertainty_score":0.011326432},"labels":[],"label_agreement":null},{"id":"W381998577","doi":"","title":"Expansión de las Redes de Transmisión Eléctrica en Norteamérica: Teoría y Aplicaciones [The Expansion of Electricity Networks in North America: Theory and Applications]","year":2010,"lang":"es","type":"article","venue":"MPRA Paper","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electric power transmission; Tariff; Electricity; Grid; Transmission network; Electric power system; Electric power; Welfare economics; Topology (electrical circuits); Transmission (telecommunications); Computer science; Electrical engineering; Telecommunications; Business; Power (physics); Economics; Geography; Engineering; Physics","score_opus":0.0023402236827680892,"score_gpt":0.19779018148525632,"score_spread":0.19544995780248822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W381998577","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38005653,0.0048249164,0.5414654,0.0018964815,0.00018538971,0.00016229443,0.00018637588,0.00048242006,0.070740156],"genre_scores_gemma":[0.9434103,0.001974141,0.045644812,0.000053263288,0.000045777226,0.000078032266,0.000030515443,0.000018453,0.008744656],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99986005,0.000052770076,0.0000038010214,0.000026639582,0.00003914432,0.00001766474],"domain_scores_gemma":[0.9997321,0.000114904826,0.000051011026,0.000032727075,0.000054587515,0.000014642123],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00077142735,0.0002984375,0.00018513446,0.00052274327,0.0003158109,0.00084366667,0.00049878686,0.0003530362,0.0026408378],"category_scores_gemma":[0.0013074988,0.00016180942,0.0002585405,0.00063859596,0.00079494435,0.0008812798,0.0003220399,0.0004058596,0.00013639951],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010357974,0.000091389724,0.0063066846,0.0001570283,0.00003705647,0.00028616554,0.00034987216,0.3873377,0.004621615,0.3540088,0.0046445867,0.24205548],"study_design_scores_gemma":[0.00006669996,0.0001462185,0.0044599636,0.00007271683,0.000046539433,0.00031892466,0.00021290031,0.90923715,0.0023461687,0.058936488,0.024132596,0.000023587849],"about_ca_topic_score_codex":0.01942081,"about_ca_topic_score_gemma":0.029983733,"teacher_disagreement_score":0.01942081,"about_ca_system_score_codex":0.0015991072,"about_ca_system_score_gemma":0.0007554934,"threshold_uncertainty_score":0.038615525},"labels":[],"label_agreement":null},{"id":"W4205956847","doi":"10.1109/pesgm46819.2021.9638073","title":"Operation of a CAES Facility Under Price Uncertainties Using Robust Optimization","year":2021,"lang":"en","type":"article","venue":"2021 IEEE Power &amp; Energy Society General Meeting (PESGM)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Schedule; Monte Carlo method; Robust optimization; Computer science; Electricity price; Compressed air energy storage; Electricity; Mathematical optimization; Spinning; Energy storage; Engineering; Mathematics; Power (physics); Statistics","score_opus":0.023222494058090903,"score_gpt":0.228432942330787,"score_spread":0.2052104482726961,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4205956847","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20580848,0.00046948335,0.7676674,0.0006749084,0.000050106497,0.0001248533,0.0004499593,0.00054886594,0.024206009],"genre_scores_gemma":[0.99121475,0.00009571205,0.0071060914,0.00001789309,0.00000942701,0.000044744567,0.00006252442,0.000029757543,0.001419054],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951625,0.00015871064,0.000015919686,0.000092046015,0.00014282386,0.00007418314],"domain_scores_gemma":[0.9995327,0.00024692988,0.000115109804,0.000022543132,0.00006260488,0.000020165313],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007014601,0.0008460714,0.0010492542,0.00034646114,0.00045277204,0.0014905113,0.000797965,0.001089524,0.0014478872],"category_scores_gemma":[0.0012073001,0.0005021981,0.0008703728,0.00037209972,0.0007987079,0.00094868004,0.00070147385,0.0007861568,0.0001909462],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011293563,0.0000040217706,0.00006661643,0.0000052846726,0.000004912486,0.00001580525,0.0000030874,0.9984465,0.00022094409,0.00066430133,0.000036804107,0.000520436],"study_design_scores_gemma":[0.0000026948553,0.000010647387,0.000040619474,8.352875e-7,0.000002258143,0.000002720922,0.000002377426,0.99957794,0.0001090463,0.00020764023,0.000041420975,0.0000018263385],"about_ca_topic_score_codex":0.015637783,"about_ca_topic_score_gemma":0.0073396815,"teacher_disagreement_score":0.015637783,"about_ca_system_score_codex":0.0015832447,"about_ca_system_score_gemma":0.001345401,"threshold_uncertainty_score":0.031093538},"labels":[],"label_agreement":null},{"id":"W4207012948","doi":"10.1049/gtd2.12404","title":"A sequential hybridization of ETLBO and IPSO for solving reserve‐constrained combined heat, power and economic dispatch problem","year":2022,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Mathematical optimization; Economic dispatch; Computer science; Particle swarm optimization; Optimization problem; Metaheuristic; Constraint (computer-aided design); Process (computing); Electric power system; Power (physics); Engineering; Mathematics","score_opus":0.009313522383580705,"score_gpt":0.21082551241603595,"score_spread":0.20151199003245523,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4207012948","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07925134,0.0002731364,0.9079468,0.00029053597,0.00011416823,0.00014734168,0.00006382234,0.0004180416,0.011494791],"genre_scores_gemma":[0.7787592,0.00013838967,0.216452,0.00015363283,0.000056509845,0.00028600352,0.0001217619,0.00006632073,0.0039660805],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99962664,0.00013099304,0.00002103634,0.00006725488,0.0000947548,0.000059265116],"domain_scores_gemma":[0.999567,0.00023824295,0.000049533137,0.000026558628,0.000081172184,0.000037528822],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008401385,0.00080529705,0.0008652499,0.0005789903,0.00031672788,0.00067003886,0.0009301858,0.0007664304,0.0023389182],"category_scores_gemma":[0.0012666453,0.00042303442,0.00051254727,0.000512497,0.00043070878,0.0005544281,0.000661241,0.0005777032,0.00022255021],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000077670564,0.00006199971,0.00040162212,0.000047922276,0.000025826106,0.000042394553,0.000019802543,0.9709952,0.001238081,0.0024173113,0.00050311687,0.024169149],"study_design_scores_gemma":[0.000008105692,0.000019652318,0.00003448961,0.0000016113462,0.0000028912598,0.0000035701137,0.0000030259541,0.99942553,0.00014990222,0.00023129398,0.000118838616,0.0000011527925],"about_ca_topic_score_codex":0.004816799,"about_ca_topic_score_gemma":0.0039225905,"teacher_disagreement_score":0.004816799,"about_ca_system_score_codex":0.00043466134,"about_ca_system_score_gemma":0.0010460608,"threshold_uncertainty_score":0.009577513},"labels":[],"label_agreement":null},{"id":"W4210254026","doi":"10.1016/j.tej.2022.107080","title":"Does dynamic pricing work in a winter-peaking climate? A case study of Hydro Quebec","year":2022,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec; Desjardins","funders":"","keywords":"Work (physics); Environmental science; Hydro power; Hydroelectricity; Climate change; Economics; Meteorology; Geography; Engineering; Water resource management; Oceanography; Geology; Electrical engineering","score_opus":0.005218323653306488,"score_gpt":0.21522961050368727,"score_spread":0.21001128685038079,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210254026","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98463744,0.00014982185,0.0008679343,0.0011865098,0.00002370967,0.000064179505,0.00036036392,0.00004838747,0.012661623],"genre_scores_gemma":[0.9953739,0.000086991095,0.00063134695,0.00006304304,0.0000059205913,0.000009377393,0.0001228075,0.000015052997,0.0036915387],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9994978,0.00017364448,0.000009963355,0.000049274913,0.000071232644,0.00019804061],"domain_scores_gemma":[0.99855524,0.00064871646,0.00008187909,0.00006619328,0.00038007708,0.00026791668],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007985202,0.00040968443,0.00033977747,0.00039253393,0.0024397436,0.0020092041,0.0015244365,0.0015297477,0.0034444472],"category_scores_gemma":[0.0023390318,0.0002392437,0.00035564895,0.0011506666,0.001004771,0.0008212477,0.0005241083,0.0007798464,0.00025200692],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002143801,0.0030586561,0.17059529,0.00037079758,0.0004002329,0.022177871,0.004595067,0.6799342,0.0092141535,0.02148326,0.027521003,0.05850575],"study_design_scores_gemma":[0.000722948,0.0008433402,0.16965702,0.000113211536,0.00020477433,0.0009567084,0.026259659,0.7683463,0.002638441,0.00464183,0.025408715,0.00020707435],"about_ca_topic_score_codex":0.93127316,"about_ca_topic_score_gemma":0.95132285,"teacher_disagreement_score":0.06872684,"about_ca_system_score_codex":0.010922378,"about_ca_system_score_gemma":0.0066749356,"threshold_uncertainty_score":0.1382631},"labels":[],"label_agreement":null},{"id":"W4213335749","doi":"10.5547/01956574.43.5.sdeb","title":"Reciprocal Dumping under Dichotomous Regulation","year":2022,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Inefficiency; Economics; Microeconomics; Subgame perfect equilibrium; Nash equilibrium; Scarcity; Outcome (game theory); Pareto principle; Subgame; Industrial organization; Best response","score_opus":0.00581100140378099,"score_gpt":0.17392379213052422,"score_spread":0.16811279072674323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4213335749","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29013416,0.00033973888,0.5221733,0.002911686,0.00015443249,0.00021594872,0.0004757759,0.00039654458,0.18319848],"genre_scores_gemma":[0.97537494,0.000118934535,0.01599452,0.00035724658,0.00002546932,0.00014545383,0.000046889232,0.00003498363,0.00790164],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99551266,0.0018016228,0.00017155403,0.00092097913,0.0007734626,0.0008195671],"domain_scores_gemma":[0.99475044,0.0023764423,0.0009923743,0.0008442827,0.00060765113,0.00042884002],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039319694,0.00062930596,0.0011423635,0.0006158556,0.0011430368,0.0028918874,0.001480702,0.0022371633,0.011023642],"category_scores_gemma":[0.010882456,0.00046766427,0.001227305,0.00054624915,0.003965823,0.0027751666,0.003498827,0.00218227,0.00088584755],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015154434,0.000080625556,0.0011614661,0.00013082204,0.000059144528,0.0004020016,0.00024089727,0.07012829,0.0065226853,0.9085524,0.0015465005,0.011023588],"study_design_scores_gemma":[0.00012024329,0.00016744352,0.0010818677,0.000055208595,0.000052003736,0.000317787,0.00023514443,0.17335944,0.002962513,0.816553,0.005030334,0.00006493899],"about_ca_topic_score_codex":0.0014285735,"about_ca_topic_score_gemma":0.0012034997,"teacher_disagreement_score":0.011023642,"about_ca_system_score_codex":0.0017354576,"about_ca_system_score_gemma":0.0013819865,"threshold_uncertainty_score":0.03687775},"labels":[],"label_agreement":null},{"id":"W4213457847","doi":"10.3390/su14052586","title":"A Cost-Effective Solution for Non-Convex Economic Load Dispatch Problems in Power Systems Using Slime Mould Algorithm","year":2022,"lang":"en","type":"article","venue":"Sustainability","topic":"Electric Power System Optimization","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Taif University","keywords":"Heuristic; Mathematical optimization; Economic dispatch; Electric power system; Regular polygon; Power (physics); Algorithm; Computer science; Electric power; SMA*; Mathematics","score_opus":0.009602637968026432,"score_gpt":0.2476682963867971,"score_spread":0.23806565841877067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4213457847","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03278306,0.00025873233,0.9627263,0.00017881898,0.000040869956,0.000080604186,0.00005437883,0.00020511555,0.0036721325],"genre_scores_gemma":[0.5121673,0.00024252676,0.4838879,0.00010681975,0.000033091943,0.00033352073,0.00015582878,0.00007898148,0.002994072],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99978226,0.00009620129,0.000011349534,0.000022368931,0.00005815205,0.00002974629],"domain_scores_gemma":[0.9995505,0.00029446298,0.000036238274,0.000019205736,0.00007750438,0.000022155751],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007702297,0.0007664436,0.00080083456,0.0008085531,0.00040025587,0.0005719398,0.00079964916,0.0009915073,0.00233758],"category_scores_gemma":[0.0017182734,0.00035299026,0.0006130134,0.00077398104,0.00040416926,0.0006224494,0.00054141163,0.000628482,0.00023747468],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043699783,0.000027697411,0.00024177,0.00004133575,0.00001831997,0.000021740008,0.000019166875,0.96750313,0.0006572034,0.004394615,0.00056661176,0.026464637],"study_design_scores_gemma":[0.000008896436,0.000021896849,0.00003624068,0.0000031031109,0.0000022805268,0.0000036804872,0.000003904178,0.99874973,0.00012391456,0.00086523517,0.00017950902,0.0000014969675],"about_ca_topic_score_codex":0.0044743293,"about_ca_topic_score_gemma":0.004020322,"teacher_disagreement_score":0.0044743293,"about_ca_system_score_codex":0.000597756,"about_ca_system_score_gemma":0.0013923853,"threshold_uncertainty_score":0.008896589},"labels":[],"label_agreement":null},{"id":"W4226181057","doi":"10.26686/wgtn.16993156","title":"Essays on the Interaction Between Risk and Market Structure in Electricity Markets","year":2011,"lang":"en","type":"dissertation","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Victoria University; Institute of Circulatory and Respiratory Health; Victoria University of Wellington","keywords":"Spot contract; Hedge; Forward contract; Electricity market; Spot market; Economics; Market power; Microeconomics; Electricity; Oligopoly; Supply and demand; Market structure; Financial economics; Cournot competition; Futures contract","score_opus":0.005767400637007257,"score_gpt":0.2053172188057479,"score_spread":0.19954981816874065,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226181057","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09406918,0.098852955,0.105646245,0.22105452,0.006998559,0.0001083359,0.0005334113,0.00015570137,0.47258103],"genre_scores_gemma":[0.81575704,0.04910866,0.009398012,0.00847484,0.010882647,0.00010380065,0.00013659442,0.00013628602,0.10600211],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940443,0.00024056682,0.00002833428,0.00008764756,0.00016955522,0.00006944783],"domain_scores_gemma":[0.996307,0.002913596,0.00027491132,0.00015534015,0.00025090305,0.000098119635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014973405,0.00058949133,0.00045819732,0.000725539,0.0009785211,0.0026721533,0.00076240866,0.0023634096,0.0075207395],"category_scores_gemma":[0.005735846,0.0003027072,0.0006873613,0.0008444014,0.003503412,0.004275863,0.0009561395,0.0022761857,0.0008034659],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027293478,0.000051538096,0.00070163736,0.00010811305,0.000021380505,0.00016351273,0.0005822517,0.009373128,0.0003260618,0.9468828,0.02476293,0.016999247],"study_design_scores_gemma":[0.00002413474,0.00003920333,0.0014119007,0.00023745127,0.000013586115,0.00010121819,0.00045796525,0.008737344,0.00015999877,0.86939085,0.119404644,0.000021681664],"about_ca_topic_score_codex":0.0014116524,"about_ca_topic_score_gemma":0.0009680815,"teacher_disagreement_score":0.0075207395,"about_ca_system_score_codex":0.0017667372,"about_ca_system_score_gemma":0.0008287493,"threshold_uncertainty_score":0.025159359},"labels":[],"label_agreement":null},{"id":"W4226185857","doi":"10.26686/wgtn.16993156.v1","title":"Essays on the Interaction  Between Risk and Market  Structure in Electricity  Markets","year":2011,"lang":"en","type":"dissertation","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Victoria University; Institute of Circulatory and Respiratory Health; Victoria University of Wellington","keywords":"Spot contract; Hedge; Forward contract; Electricity market; Spot market; Economics; Market power; Microeconomics; Electricity; Oligopoly; Supply and demand; Market structure; Financial economics; Cournot competition; Futures contract","score_opus":0.005767400637007257,"score_gpt":0.2053172188057479,"score_spread":0.19954981816874065,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226185857","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09406918,0.098852955,0.105646245,0.22105452,0.006998559,0.0001083359,0.0005334113,0.00015570137,0.47258103],"genre_scores_gemma":[0.81575704,0.04910866,0.009398012,0.00847484,0.010882647,0.00010380065,0.00013659442,0.00013628602,0.10600211],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940443,0.00024056682,0.00002833428,0.00008764756,0.00016955522,0.00006944783],"domain_scores_gemma":[0.996307,0.002913596,0.00027491132,0.00015534015,0.00025090305,0.000098119635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014973405,0.00058949133,0.00045819732,0.000725539,0.0009785211,0.0026721533,0.00076240866,0.0023634096,0.0075207395],"category_scores_gemma":[0.005735846,0.0003027072,0.0006873613,0.0008444014,0.003503412,0.004275863,0.0009561395,0.0022761857,0.0008034659],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027293478,0.000051538096,0.00070163736,0.00010811305,0.000021380505,0.00016351273,0.0005822517,0.009373128,0.0003260618,0.9468828,0.02476293,0.016999247],"study_design_scores_gemma":[0.00002413474,0.00003920333,0.0014119007,0.00023745127,0.000013586115,0.00010121819,0.00045796525,0.008737344,0.00015999877,0.86939085,0.119404644,0.000021681664],"about_ca_topic_score_codex":0.0014116524,"about_ca_topic_score_gemma":0.0009680815,"teacher_disagreement_score":0.0075207395,"about_ca_system_score_codex":0.0017667372,"about_ca_system_score_gemma":0.0008287493,"threshold_uncertainty_score":0.025159359},"labels":[],"label_agreement":null},{"id":"W4230243395","doi":"10.52549/ijeei.v7i4.1336","title":"Assessment of Different Strategies in Optimizing Network Operation Incorporating PV System","year":2019,"lang":"en","type":"article","venue":"Indonesian Journal of Electrical Engineering and Informatics (IJEEI)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"Universiti Teknologi Brunei","keywords":"Dispatchable generation; Software deployment; Renewable energy; Weighting; Distributed generation; Engineering; Reliability engineering; Photovoltaic system; Computer science; Mathematical optimization; Electrical engineering","score_opus":0.0029817879408428226,"score_gpt":0.18711169164257013,"score_spread":0.1841299037017273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230243395","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8460725,0.0008094016,0.13219315,0.00023974117,0.000026578782,0.00028271673,0.000138945,0.0001681132,0.02006889],"genre_scores_gemma":[0.99248546,0.00010516317,0.0069508683,0.00000901238,0.0000023817,0.000029442412,0.000025509193,0.00000709824,0.0003851645],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996138,0.00018553392,0.000013690599,0.00004356701,0.00008674612,0.000056702625],"domain_scores_gemma":[0.99949443,0.00026763976,0.00007174824,0.000030471138,0.000105323365,0.000030396055],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008341538,0.0008630723,0.00044090397,0.00061958056,0.00022706998,0.0007924062,0.0005392182,0.0007168265,0.0007298197],"category_scores_gemma":[0.0015056201,0.0002241136,0.00040094845,0.00046958556,0.00025714614,0.0006771471,0.00033454894,0.00031190252,0.000082374216],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014742828,0.000118951335,0.0018741784,0.00007249172,0.00004207796,0.00006915857,0.000020205252,0.97503,0.0023862459,0.0011228311,0.00013057509,0.018985832],"study_design_scores_gemma":[0.000029164383,0.0005808973,0.0023360641,0.000012385409,0.00004630127,0.000028098972,0.000071650604,0.9935406,0.002399379,0.0006475479,0.00029867887,0.000009255583],"about_ca_topic_score_codex":0.0031493877,"about_ca_topic_score_gemma":0.004240882,"teacher_disagreement_score":0.0031493877,"about_ca_system_score_codex":0.0007324489,"about_ca_system_score_gemma":0.0005051286,"threshold_uncertainty_score":0.0062621236},"labels":[],"label_agreement":null},{"id":"W4232112611","doi":"10.32920/ryerson.14648058.v1","title":"Unit commitment using complementarity","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University; Toronto Metropolitan University","funders":"","keywords":"Mathematical optimization; Power system simulation; Complementarity (molecular biology); Computer science; Nonlinear system; Complementarity theory; Linear programming; Generator (circuit theory); Economic dispatch; Integer programming; Grid; Integer (computer science); Power (physics); Mathematics; Electric power system","score_opus":0.05794564141867547,"score_gpt":0.2770386808553337,"score_spread":0.2190930394366582,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4232112611","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017985397,0.0010377357,0.9525275,0.0003691425,0.00013296996,0.00006581549,0.00011167078,0.00013162276,0.043825045],"genre_scores_gemma":[0.5147846,0.005029238,0.4411613,0.00082152296,0.00040927422,0.0007868627,0.000544968,0.00039046365,0.03607191],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988763,0.00046053148,0.000036535395,0.00013366935,0.00040583353,0.00008710541],"domain_scores_gemma":[0.99928826,0.00042513994,0.000070376176,0.00006975637,0.000119463126,0.000027016837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010156594,0.0011651153,0.0009841289,0.00079031807,0.0005301456,0.0019212278,0.0010276384,0.00079287676,0.011691345],"category_scores_gemma":[0.0026499198,0.0004915131,0.00087065314,0.001987132,0.0011688292,0.0013373379,0.0018594611,0.0017407915,0.0020144917],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030169102,0.000019919538,0.00011632683,0.00023431533,0.000054601893,0.00008384662,0.00005531142,0.506514,0.0011344075,0.44378588,0.0054124333,0.04255866],"study_design_scores_gemma":[0.000020081416,0.000042053398,0.000076627264,0.0000778094,0.000015644464,0.00007587839,0.000025488387,0.73104525,0.0008251271,0.2523778,0.015397688,0.00002045469],"about_ca_topic_score_codex":0.004033876,"about_ca_topic_score_gemma":0.0029962885,"teacher_disagreement_score":0.011691345,"about_ca_system_score_codex":0.0011920099,"about_ca_system_score_gemma":0.0014876407,"threshold_uncertainty_score":0.039111376},"labels":[],"label_agreement":null},{"id":"W4232668127","doi":"10.1109/access.2017.2768522","title":"Solution of an Economic Dispatch Problem Through Particle Swarm Optimization: A Detailed Survey – Part II","year":2017,"lang":"en","type":"article","venue":"IEEE Access","topic":"Electric Power System Optimization","field":"Engineering","cited_by":72,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Particle swarm optimization; Mathematical optimization; Premature convergence; Convergence (economics); Computer science; Optimization problem; Multi-swarm optimization; Economic dispatch; Metaheuristic; Mathematics; Electric power system","score_opus":0.0379337132394792,"score_gpt":0.28847660033494227,"score_spread":0.2505428870954631,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4232668127","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008542381,0.48722324,0.4515988,0.0021541798,0.0014630319,0.00016996404,0.00019852775,0.000277485,0.04837244],"genre_scores_gemma":[0.09402246,0.70564014,0.17690565,0.0007204408,0.0028355955,0.00020781827,0.000790207,0.00017399574,0.018703748],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996897,0.00007795887,0.000041052182,0.00007311416,0.00010014997,0.000018203546],"domain_scores_gemma":[0.9997727,0.000114255155,0.000021914344,0.000024455845,0.00005638408,0.000010220617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048748823,0.00083195814,0.0008152704,0.0011858626,0.0002732638,0.0013765247,0.00065249053,0.0011710246,0.0022756844],"category_scores_gemma":[0.0011067822,0.0005724432,0.0007368374,0.0025506103,0.000444186,0.0013991386,0.00058862113,0.001162224,0.0014549729],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056709145,0.00021776743,0.0010713923,0.0045872154,0.0001757239,0.0002759399,0.00017861783,0.062447544,0.0040959795,0.06922121,0.018581344,0.83909065],"study_design_scores_gemma":[0.000028086415,0.00036846843,0.0044435207,0.0019888654,0.00013519668,0.0014516047,0.0002371364,0.23557577,0.005252981,0.08341607,0.6669828,0.000119604556],"about_ca_topic_score_codex":0.0013622326,"about_ca_topic_score_gemma":0.0008154693,"teacher_disagreement_score":0.0022756844,"about_ca_system_score_codex":0.00042070195,"about_ca_system_score_gemma":0.00066709926,"threshold_uncertainty_score":0.007612884},"labels":[],"label_agreement":null},{"id":"W4233924219","doi":"10.32920/ryerson.14663373.v1","title":"Techno-economic models for integration of wind energy.","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Probabilistic logic; Wind speed; Electric power system; Computer science; Induction generator; Electricity generation; Control theory (sociology); Power (physics); Engineering; Electrical engineering; Meteorology","score_opus":0.012192574526919865,"score_gpt":0.20543327907608971,"score_spread":0.19324070454916986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4233924219","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0045476523,0.001915487,0.93707466,0.0017618631,0.0006269823,0.000113612245,0.00057209714,0.0002722735,0.053115424],"genre_scores_gemma":[0.58590615,0.008195634,0.30026478,0.0009963361,0.0010280809,0.0017194817,0.0020038157,0.00051020825,0.09937552],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993525,0.00021919752,0.000041361072,0.00006504584,0.000273648,0.00004824061],"domain_scores_gemma":[0.9990854,0.00050329085,0.000106252315,0.000104532424,0.00015769857,0.00004277774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010158912,0.0012970028,0.00068339164,0.0010072653,0.000541075,0.0017176184,0.0014340298,0.0015221266,0.010934084],"category_scores_gemma":[0.0032376987,0.0005421679,0.0012662943,0.0013465456,0.00076716807,0.0023278822,0.0012406376,0.0022522833,0.0021949303],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011147837,0.000039420953,0.00043503614,0.000079967365,0.00004953368,0.00014073377,0.000058041773,0.36015704,0.00024604658,0.6227189,0.0046825707,0.011381556],"study_design_scores_gemma":[0.000011410029,0.000015500615,0.00012966628,0.00002088244,0.00001493598,0.00007327452,0.000019605977,0.7849748,0.000091926035,0.19778275,0.016854078,0.000011118517],"about_ca_topic_score_codex":0.0039872983,"about_ca_topic_score_gemma":0.004538686,"teacher_disagreement_score":0.010934084,"about_ca_system_score_codex":0.0012536854,"about_ca_system_score_gemma":0.0010078541,"threshold_uncertainty_score":0.03657818},"labels":[],"label_agreement":null},{"id":"W4236317477","doi":"10.1049/oap-cired.2021.0187","title":"Flexibility platform for community energy systems","year":2020,"lang":"en","type":"article","venue":"CIRED - Open Access Proceedings Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Flexibility (engineering); Exploit; Sustainability; Renewable energy; Computer science; Environmental economics; Risk analysis (engineering); Business; Computer security; Engineering; Economics","score_opus":0.13380911455319786,"score_gpt":0.33821556656283164,"score_spread":0.20440645200963378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236317477","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09147031,0.0011088334,0.65652996,0.0046521565,0.0007892297,0.0006370309,0.0007125141,0.0038350308,0.24026488],"genre_scores_gemma":[0.91405797,0.00033056064,0.06444483,0.00023090084,0.00010290572,0.00033270384,0.0003668578,0.00013796294,0.019995335],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965,0.000112894246,0.0000135693745,0.000053604337,0.00011851599,0.000051353483],"domain_scores_gemma":[0.99965215,0.00010282396,0.000033251683,0.000076218465,0.000054949378,0.00008059162],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005722667,0.0005028541,0.00030448206,0.00034153607,0.00070420693,0.0014280534,0.00096198334,0.0009091911,0.017488325],"category_scores_gemma":[0.0018569963,0.00015524919,0.00037635397,0.00033724672,0.0005598571,0.0019283767,0.0030307167,0.001228632,0.0017249566],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019396153,0.00022955005,0.00085586245,0.00019556818,0.000059851027,0.0005360104,0.00017853413,0.46716303,0.0066679497,0.39556572,0.017575115,0.11077894],"study_design_scores_gemma":[0.00005696976,0.00011469257,0.0003941503,0.00005217479,0.000008473598,0.00011980849,0.00012812673,0.73374355,0.0015480132,0.20385753,0.059942693,0.000033764027],"about_ca_topic_score_codex":0.0017743871,"about_ca_topic_score_gemma":0.0020144917,"teacher_disagreement_score":0.017488325,"about_ca_system_score_codex":0.0005421028,"about_ca_system_score_gemma":0.00083112344,"threshold_uncertainty_score":0.058504283},"labels":[],"label_agreement":null},{"id":"W4236343770","doi":"10.32920/ryerson.14663373","title":"Techno-economic models for integration of wind energy.","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Probabilistic logic; Wind speed; Electric power system; Computer science; Induction generator; Electricity generation; Control theory (sociology); Power (physics); Engineering; Electrical engineering","score_opus":0.012192574526919865,"score_gpt":0.20543327907608971,"score_spread":0.19324070454916986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236343770","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0045476523,0.001915487,0.93707466,0.0017618631,0.0006269823,0.000113612245,0.00057209714,0.0002722735,0.053115424],"genre_scores_gemma":[0.58590615,0.008195634,0.30026478,0.0009963361,0.0010280809,0.0017194817,0.0020038157,0.00051020825,0.09937552],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993525,0.00021919752,0.000041361072,0.00006504584,0.000273648,0.00004824061],"domain_scores_gemma":[0.9990854,0.00050329085,0.000106252315,0.000104532424,0.00015769857,0.00004277774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010158912,0.0012970028,0.00068339164,0.0010072653,0.000541075,0.0017176184,0.0014340298,0.0015221266,0.010934084],"category_scores_gemma":[0.0032376987,0.0005421679,0.0012662943,0.0013465456,0.00076716807,0.0023278822,0.0012406376,0.0022522833,0.0021949303],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011147837,0.000039420953,0.00043503614,0.000079967365,0.00004953368,0.00014073377,0.000058041773,0.36015704,0.00024604658,0.6227189,0.0046825707,0.011381556],"study_design_scores_gemma":[0.000011410029,0.000015500615,0.00012966628,0.00002088244,0.00001493598,0.00007327452,0.000019605977,0.7849748,0.000091926035,0.19778275,0.016854078,0.000011118517],"about_ca_topic_score_codex":0.0039872983,"about_ca_topic_score_gemma":0.004538686,"teacher_disagreement_score":0.010934084,"about_ca_system_score_codex":0.0012536854,"about_ca_system_score_gemma":0.0010078541,"threshold_uncertainty_score":0.03657818},"labels":[],"label_agreement":null},{"id":"W4236816715","doi":"10.1109/pesgm46819.2021.9638223","title":"Integrating Net Benefits Test for Demand Response into Optimal Power Flow Formulation","year":2021,"lang":"en","type":"article","venue":"2021 IEEE Power &amp; Energy Society General Meeting (PESGM)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Procurement; Demand response; Power flow; Payment; Test (biology); Commission; Environmental economics; Order (exchange); Business; Microeconomics; Economics; Power (physics); Finance; Electric power system; Engineering; Electrical engineering; Marketing; Electricity","score_opus":0.009788778924891068,"score_gpt":0.22739884631258642,"score_spread":0.21761006738769534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236816715","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008330422,0.0004186892,0.9555843,0.0012263492,0.00032063617,0.0003351693,0.00019895239,0.00019241609,0.03339311],"genre_scores_gemma":[0.66678286,0.0007061443,0.30163878,0.0014223524,0.00044486896,0.0017112414,0.00063266745,0.00053308444,0.026128015],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986141,0.00075766246,0.0000302809,0.000106903535,0.00030225492,0.00018884691],"domain_scores_gemma":[0.99720746,0.0021099988,0.00011291888,0.00005814185,0.00043271662,0.00007877537],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004441486,0.0015068558,0.0014829929,0.0009890058,0.0004564882,0.0017382031,0.001376682,0.0019259583,0.011913556],"category_scores_gemma":[0.011187121,0.0008320121,0.0010108795,0.0006351265,0.0012520123,0.001977728,0.0013688476,0.002806669,0.00079874555],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045088655,0.000046809546,0.00021405246,0.000066122615,0.00001592323,0.000083943894,0.000028219714,0.95315796,0.0002528182,0.03813677,0.0020714698,0.005880798],"study_design_scores_gemma":[0.000009620412,0.000021024338,0.00003151393,0.000011693919,0.000002569629,0.000006071419,0.000010161238,0.99016947,0.000070836926,0.00881954,0.0008434691,0.00000401647],"about_ca_topic_score_codex":0.008001396,"about_ca_topic_score_gemma":0.0065523945,"teacher_disagreement_score":0.011913556,"about_ca_system_score_codex":0.0013196436,"about_ca_system_score_gemma":0.0028327843,"threshold_uncertainty_score":0.039854884},"labels":[],"label_agreement":null},{"id":"W4238244078","doi":"10.1007/978-0-387-95861-3_18","title":"Economic Analysis","year":2011,"lang":"en","type":"book-chapter","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Context (archaeology); Environmental economics; Resource (disambiguation); Unit (ring theory); State (computer science); Energy (signal processing); Politics; Unit price; Efficient energy use; Industrial organization; Engineering; Natural resource economics; Business; Economics; Computer science; Electrical engineering; Microeconomics; Political science; Geography","score_opus":0.007949964389125933,"score_gpt":0.16536290273645446,"score_spread":0.15741293834732853,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4238244078","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010303096,0.00563009,0.018576207,0.0041861203,0.0006486507,0.000028896338,0.00018174958,0.000055750595,0.96966225],"genre_scores_gemma":[0.06389908,0.013286384,0.0068528443,0.0012143413,0.00097043667,0.0001227596,0.00033445982,0.00016502167,0.9131547],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995623,0.00011450259,0.000010727986,0.000059393926,0.00020740008,0.00004554272],"domain_scores_gemma":[0.9997937,0.000075386655,0.0000109540315,0.000043401284,0.00006472153,0.000011850167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005639247,0.00086736423,0.0006310335,0.0011339097,0.0006498843,0.0021339434,0.000626065,0.0011940013,0.046299502],"category_scores_gemma":[0.001482558,0.00030721544,0.00047312403,0.0011216904,0.0013529726,0.0017904122,0.0007524133,0.002125139,0.011210534],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000947653,0.000029472985,0.00008067358,0.00005797736,0.0000115990215,0.00002781771,0.000043495114,0.0034238698,0.000108591405,0.83603984,0.10054559,0.059621662],"study_design_scores_gemma":[0.0000034481175,0.000007775167,0.00028371598,0.00012496785,0.000008020501,0.000045677763,0.000057406018,0.0034096965,0.00014452379,0.59474736,0.40116054,0.000006913504],"about_ca_topic_score_codex":0.003707836,"about_ca_topic_score_gemma":0.004938885,"teacher_disagreement_score":0.046299502,"about_ca_system_score_codex":0.0027179732,"about_ca_system_score_gemma":0.0014608449,"threshold_uncertainty_score":0.1548872},"labels":[],"label_agreement":null},{"id":"W4240680820","doi":"10.3917/scpo.bafoi.2014.01.0087","title":"Accès à l'énergie en Europe","year":2014,"lang":"fr","type":"book-chapter","venue":"Presses de Sciences Po eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Musée de la Civilisation","funders":"","keywords":"Political science; Humanities; Art","score_opus":0.018639439020601313,"score_gpt":0.2269180435069877,"score_spread":0.20827860448638638,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4240680820","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0046050716,0.052995678,0.003442487,0.0030714301,0.00090577,0.000012698184,0.00016938616,0.00008119776,0.9347162],"genre_scores_gemma":[0.15056953,0.1004187,0.0058353366,0.0018997075,0.0011434848,0.000060066905,0.00058882724,0.00021174565,0.73927265],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996909,0.00006571166,0.000017708267,0.000058295427,0.00013005502,0.000037337973],"domain_scores_gemma":[0.9998692,0.00003604107,0.000009371063,0.000018614988,0.00005111855,0.00001560222],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050893234,0.00047333783,0.00028706365,0.0018058058,0.00072781387,0.003009276,0.00035942058,0.0009768816,0.027526887],"category_scores_gemma":[0.000847487,0.00018169906,0.00030252224,0.0021058726,0.0007449332,0.0020609156,0.0014266064,0.0010812897,0.004799941],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052002462,0.000046814464,0.0003632502,0.0002941718,0.000016694663,0.00022332571,0.0010028958,0.0024844573,0.0006344605,0.7016569,0.07125533,0.22196975],"study_design_scores_gemma":[0.0000029277999,0.000012021541,0.00037490332,0.00025285518,0.0000035968,0.00014958731,0.00012140944,0.00014462511,0.00011210498,0.029652962,0.96916795,0.0000050595663],"about_ca_topic_score_codex":0.007829509,"about_ca_topic_score_gemma":0.0047180313,"teacher_disagreement_score":0.027526887,"about_ca_system_score_codex":0.0016038691,"about_ca_system_score_gemma":0.0013776938,"threshold_uncertainty_score":0.09208661},"labels":[],"label_agreement":null},{"id":"W4241283540","doi":"10.32920/ryerson.14664810","title":"Security Constrained Stochastic Power System Scheduling Algorithms - With Wind Electric Generators","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; University of New Brunswick","funders":"","keywords":"Probabilistic logic; Electric power system; Wind power; Mathematical optimization; Scheduling (production processes); Computer science; Power system simulation; Economic dispatch; Power (physics); Transmission (telecommunications); Transmission system; Engineering; Reliability engineering; Control theory (sociology); Electrical engineering; Mathematics","score_opus":0.005058629449334553,"score_gpt":0.1879276741785331,"score_spread":0.18286904472919854,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4241283540","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03186525,0.0004198384,0.96089756,0.0004989945,0.00007452395,0.000101339916,0.0002213596,0.0003975487,0.005523587],"genre_scores_gemma":[0.7183939,0.00051935855,0.273018,0.00022685135,0.000107182546,0.00033319052,0.00056247466,0.00021490887,0.0066240765],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938846,0.00024660266,0.000029016757,0.00012369172,0.00011006269,0.000102075974],"domain_scores_gemma":[0.9983322,0.0011266476,0.00017069066,0.00009218403,0.00018122648,0.0000971048],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014116243,0.0011001629,0.0012741837,0.0004232454,0.0004496743,0.0012503755,0.001292972,0.00094955723,0.0039255316],"category_scores_gemma":[0.004015523,0.0008220197,0.0007398659,0.0009367383,0.0005921622,0.001121676,0.0012172794,0.0014564977,0.000568745],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002825173,0.000012558671,0.00016198706,0.000015698355,0.000010095199,0.000013759803,0.000012849297,0.98727566,0.00009011614,0.005520512,0.0004004113,0.006458101],"study_design_scores_gemma":[0.0000052002124,0.0000040038344,0.00001237469,0.0000017564439,0.0000010639603,0.0000014687259,0.0000024189947,0.99750924,0.000021971668,0.0023451797,0.00009471302,6.696294e-7],"about_ca_topic_score_codex":0.009400477,"about_ca_topic_score_gemma":0.008982282,"teacher_disagreement_score":0.009400477,"about_ca_system_score_codex":0.0013546635,"about_ca_system_score_gemma":0.0022331954,"threshold_uncertainty_score":0.01869154},"labels":[],"label_agreement":null},{"id":"W4241913035","doi":"10.32920/ryerson.14647647.v1","title":"A secondary option market design for reserve procurement by renewable energy sources","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Intermittency; Wind power; Governor; Renewable energy; Electric power system; Procurement; Automatic Generation Control; Electricity generation; Computer science; Reliability engineering; Load balancing (electrical power); Automotive engineering; Power (physics); Environmental economics; Engineering; Business; Economics; Electrical engineering; Meteorology; Mathematics","score_opus":0.01454284087538483,"score_gpt":0.20484123753440123,"score_spread":0.1902983966590164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4241913035","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01204434,0.00042330043,0.93745404,0.0010900545,0.00023098636,0.00020086979,0.00024239944,0.00023467357,0.048079364],"genre_scores_gemma":[0.77076125,0.00079409697,0.16306032,0.00046980692,0.00039052617,0.00078028813,0.00031063598,0.00030440267,0.06312865],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986304,0.0007901146,0.000047347636,0.0001930462,0.00021954859,0.000119522214],"domain_scores_gemma":[0.9986701,0.0007035254,0.0001280156,0.00013632739,0.00021797547,0.00014412617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030072967,0.0013262022,0.0012323926,0.0006119419,0.00075565436,0.0029399474,0.0016790609,0.0017841425,0.029794976],"category_scores_gemma":[0.0057111415,0.0005843037,0.0013391242,0.0007129992,0.001361577,0.0032792217,0.0017101534,0.0019434163,0.002415188],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024166577,0.00014552221,0.00023846814,0.00026616134,0.000068103815,0.00030075118,0.00010737659,0.15286046,0.0030434523,0.80079263,0.009093417,0.03284209],"study_design_scores_gemma":[0.00009592499,0.00019783,0.0001274934,0.0000423775,0.000040446885,0.00014479904,0.0000423097,0.7054992,0.00081095373,0.28081998,0.012148696,0.000030041956],"about_ca_topic_score_codex":0.00069085875,"about_ca_topic_score_gemma":0.0009505774,"teacher_disagreement_score":0.029794976,"about_ca_system_score_codex":0.0011678081,"about_ca_system_score_gemma":0.0018006715,"threshold_uncertainty_score":0.099674046},"labels":[],"label_agreement":null},{"id":"W4245681858","doi":"10.1093/geront/gnv371.02","title":"GOT CARE! AN INTERDISCIPLINARY GERIATRIC OUTREACH AND TRAINING PROGRAM","year":2015,"lang":"en","type":"article","venue":"The Gerontologist","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; Queen's University","funders":"","keywords":"Outreach; Geriatric care; Gerontology; Medical education; Training (meteorology); Psychology; Nursing; Medicine; Political science; Geography","score_opus":0.04372060685748411,"score_gpt":0.30846356194109,"score_spread":0.2647429550836059,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4245681858","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96231425,0.0009969178,0.00076248427,0.0015972749,0.00015240902,0.00048751148,0.009531568,0.00020137572,0.023956247],"genre_scores_gemma":[0.976038,0.00081459095,0.0018238152,0.0005337131,0.000079757665,0.0007042974,0.0092211375,0.00006379371,0.01072114],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99888474,0.00029515923,0.0000967005,0.00014981139,0.00027476306,0.000298847],"domain_scores_gemma":[0.9974262,0.00053489686,0.00054084475,0.000109375454,0.0005019395,0.0008866981],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013216138,0.00033032338,0.00061234186,0.0009454795,0.0005186497,0.001176074,0.00070525944,0.0004781482,0.0123823965],"category_scores_gemma":[0.005302247,0.0002141659,0.0009323215,0.0016546644,0.00023813518,0.0011605042,0.0009512319,0.00075379194,0.0009456358],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.008100153,0.0040227226,0.54568994,0.00092683133,0.0009283891,0.00028077318,0.00071501394,0.014347845,0.0005074845,0.0026463796,0.046276726,0.37555778],"study_design_scores_gemma":[0.00096247415,0.0051146722,0.9505469,0.00030089277,0.00047297953,0.00024957096,0.003888083,0.009781176,0.0002936976,0.00077041844,0.027570553,0.00004858169],"about_ca_topic_score_codex":0.056499626,"about_ca_topic_score_gemma":0.16644838,"teacher_disagreement_score":0.056499626,"about_ca_system_score_codex":0.0029237347,"about_ca_system_score_gemma":0.002521977,"threshold_uncertainty_score":0.11234152},"labels":[],"label_agreement":null},{"id":"W4245783092","doi":"10.1109/59.932289","title":"Inter-utilities power-exchange coordination: a market-oriented approach","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electric power system; Scheduling (production processes); Computer science; Decomposition; Grid; Power system simulation; Independence (probability theory); Power market; Economic dispatch; Mathematical optimization; Market oriented; Power (physics); Economics; Mathematics","score_opus":0.009348881120758408,"score_gpt":0.19907350056024545,"score_spread":0.18972461943948704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4245783092","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032511656,0.000055726887,0.9940118,0.00010511789,0.000020402611,0.00004721098,0.0000148454255,0.00010043016,0.0023933782],"genre_scores_gemma":[0.46541366,0.0003303223,0.5283404,0.00014753299,0.00011642063,0.0003752163,0.00010335999,0.00011249363,0.0050606714],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99911433,0.0004078818,0.000031851698,0.00013827436,0.00020742421,0.00010017531],"domain_scores_gemma":[0.99951625,0.00014374292,0.00007782338,0.00007181004,0.00013444955,0.000056042427],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012477213,0.0006904392,0.0009072955,0.00070586655,0.0006325823,0.0013092358,0.001484215,0.0008981302,0.0032235093],"category_scores_gemma":[0.0010180518,0.0003414252,0.0005552809,0.0011178864,0.00072640064,0.0015316257,0.00074775534,0.0011228865,0.0005643944],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009288892,0.00018714876,0.00033919464,0.000104731436,0.00005667322,0.00017352609,0.000105846695,0.7298964,0.00856181,0.1571789,0.0034371542,0.09986576],"study_design_scores_gemma":[0.000028864144,0.000047917965,0.000087935645,0.000005343089,0.000012489995,0.00004682335,0.000024770838,0.9732579,0.0015009944,0.021499619,0.0034778775,0.0000095558125],"about_ca_topic_score_codex":0.0012313273,"about_ca_topic_score_gemma":0.0022493994,"teacher_disagreement_score":0.0032235093,"about_ca_system_score_codex":0.00087527547,"about_ca_system_score_gemma":0.0018576911,"threshold_uncertainty_score":0.010783732},"labels":[],"label_agreement":null},{"id":"W4248057387","doi":"10.5547/01956574.42.s12.dolm","title":"Offer Price Information and the Exercise of Market Power: The Effect of the Publication of the Historical Trading Report on Competition in the Alberta Electricity Market","year":2020,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University; University of Calgary","funders":"","keywords":"Electricity; Competition (biology); Electricity market; Economics; Market power; Electricity price; Operator (biology); Microeconomics; Industrial organization; Business; Engineering","score_opus":0.003044185735312914,"score_gpt":0.16255974847575128,"score_spread":0.15951556274043835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248057387","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95368797,0.0024989503,0.000713152,0.004745923,0.0002054298,0.000042047046,0.0011034453,0.00007868093,0.036924284],"genre_scores_gemma":[0.995684,0.00047059718,0.000116153285,0.00025155235,0.000103682454,0.0000055071923,0.00042667188,0.00001553167,0.0029262544],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9952254,0.0011056846,0.00017605485,0.0003454671,0.0023654772,0.0007818465],"domain_scores_gemma":[0.9220436,0.049114197,0.018209884,0.0020199341,0.0058636605,0.002748617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0054395255,0.00025436512,0.00055389386,0.0012739428,0.0013021319,0.0062679537,0.0012987321,0.0013465604,0.00641402],"category_scores_gemma":[0.04527161,0.0003065007,0.00067059236,0.002491669,0.0028090163,0.0020168743,0.0011034538,0.0022883834,0.00057691603],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0037247052,0.0013489679,0.85277086,0.00035125387,0.0008145763,0.0021513975,0.0029413016,0.028322412,0.0022224395,0.02229785,0.018178446,0.06487582],"study_design_scores_gemma":[0.00027608933,0.00068447494,0.94580644,0.00012944368,0.00055728096,0.0003218507,0.0038135026,0.021051234,0.0025233976,0.0053729205,0.019255184,0.00020821704],"about_ca_topic_score_codex":0.3633393,"about_ca_topic_score_gemma":0.3692294,"teacher_disagreement_score":0.6366607,"about_ca_system_score_codex":0.008427908,"about_ca_system_score_gemma":0.005731404,"threshold_uncertainty_score":0.7224488},"labels":[],"label_agreement":null},{"id":"W4249411402","doi":"10.33423/jabe.v22i11.3749","title":"A Game Theoretic Approach in Bidding Strategy in Iran Wholesale Electricity Market","year":2020,"lang":"en","type":"article","venue":"Journal of Applied Business and Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bidding; Profit maximization; Common value auction; Electricity market; Profit (economics); Microeconomics; Electricity; Business; Order (exchange); Economics; Industrial organization; Finance","score_opus":0.010474667970230462,"score_gpt":0.17199343912468737,"score_spread":0.1615187711544569,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249411402","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13802455,0.001029138,0.8178167,0.0015753448,0.00016578713,0.00018567118,0.00012250518,0.000065900924,0.04101445],"genre_scores_gemma":[0.9586818,0.00046120776,0.033935163,0.00014109618,0.000081400045,0.00013397695,0.000044763303,0.000019810455,0.0065008323],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985353,0.0009332039,0.000030696196,0.00012990256,0.00021459002,0.00015623223],"domain_scores_gemma":[0.99899405,0.0006219447,0.00011972548,0.000037324975,0.00015176198,0.000075255135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016881308,0.0008459431,0.0008935159,0.00068036275,0.00066590344,0.0016331201,0.0015818329,0.0012528445,0.0031425597],"category_scores_gemma":[0.003209168,0.00038705656,0.0009565445,0.00069100526,0.0015472649,0.0022677872,0.0006384961,0.001244333,0.00030046707],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008654932,0.0001818183,0.0017978431,0.0001325355,0.00009028262,0.00041662922,0.00033996988,0.58927935,0.0015855986,0.39335185,0.002030477,0.010707116],"study_design_scores_gemma":[0.000017857468,0.00005601993,0.00036425775,0.000008973494,0.000015747997,0.000068474976,0.00015493744,0.93007845,0.00010215847,0.06812116,0.0009966025,0.000015464242],"about_ca_topic_score_codex":0.006710474,"about_ca_topic_score_gemma":0.0054720277,"teacher_disagreement_score":0.006710474,"about_ca_system_score_codex":0.0019675742,"about_ca_system_score_gemma":0.0017892809,"threshold_uncertainty_score":0.014275849},"labels":[],"label_agreement":null},{"id":"W4251989391","doi":"10.1002/9780470932117.index","title":"Index","year":2011,"lang":"en","type":"paratext","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Index (typography); Computer science; Information retrieval; Citation; Probabilistic logic; Library science; World Wide Web; Artificial intelligence","score_opus":0.008525914379281513,"score_gpt":0.19109723437821785,"score_spread":0.18257131999893633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4251989391","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001893678,0.0025680026,0.08137908,0.002722162,0.0074671623,0.000871642,0.016624374,0.009075415,0.87739843],"genre_scores_gemma":[0.011136356,0.0030531862,0.047116064,0.0010369865,0.0016626552,0.00064397446,0.022458527,0.0026924857,0.9101998],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99846894,0.00016410068,0.00011840825,0.00024185042,0.00089682016,0.00010973619],"domain_scores_gemma":[0.99764544,0.00035113914,0.000098865596,0.0005025782,0.0012083147,0.00019369372],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0011781933,0.0013895916,0.0007806888,0.0030465298,0.0012029737,0.004950783,0.0022556097,0.0012032664,0.5623595],"category_scores_gemma":[0.0057137087,0.0004960792,0.0009081985,0.0037950901,0.00036509248,0.004191542,0.0023367507,0.0012655352,0.3911668],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007011555,0.00006416982,0.00043172974,0.00021725593,0.000010878984,0.00004818774,0.000054521337,0.0007958856,0.00067762437,0.023220424,0.607235,0.3671742],"study_design_scores_gemma":[0.000014376586,0.000030887728,0.0005150426,0.000107063795,0.0000074916948,0.00009940471,0.00005555027,0.0013422912,0.0006729582,0.010337224,0.9868036,0.000014104112],"about_ca_topic_score_codex":0.0020561265,"about_ca_topic_score_gemma":0.00226104,"teacher_disagreement_score":0.4376405,"about_ca_system_score_codex":0.001306338,"about_ca_system_score_gemma":0.0015576666,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4252268603","doi":"10.32920/ryerson.14648058","title":"Unit commitment using complementarity","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University; Toronto Metropolitan University","funders":"","keywords":"Mathematical optimization; Power system simulation; Complementarity (molecular biology); Computer science; Nonlinear system; Complementarity theory; Economic dispatch; Linear programming; Generator (circuit theory); Integer programming; Grid; Integer (computer science); Power (physics); Mathematics; Electric power system","score_opus":0.05794564141867547,"score_gpt":0.2770386808553337,"score_spread":0.2190930394366582,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4252268603","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017985397,0.0010377357,0.9525275,0.0003691425,0.00013296996,0.00006581549,0.00011167078,0.00013162276,0.043825045],"genre_scores_gemma":[0.5147846,0.005029238,0.4411613,0.00082152296,0.00040927422,0.0007868627,0.000544968,0.00039046365,0.03607191],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988763,0.00046053148,0.000036535395,0.00013366935,0.00040583353,0.00008710541],"domain_scores_gemma":[0.99928826,0.00042513994,0.000070376176,0.00006975637,0.000119463126,0.000027016837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010156594,0.0011651153,0.0009841289,0.00079031807,0.0005301456,0.0019212278,0.0010276384,0.00079287676,0.011691345],"category_scores_gemma":[0.0026499198,0.0004915131,0.00087065314,0.001987132,0.0011688292,0.0013373379,0.0018594611,0.0017407915,0.0020144917],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030169102,0.000019919538,0.00011632683,0.00023431533,0.000054601893,0.00008384662,0.00005531142,0.506514,0.0011344075,0.44378588,0.0054124333,0.04255866],"study_design_scores_gemma":[0.000020081416,0.000042053398,0.000076627264,0.0000778094,0.000015644464,0.00007587839,0.000025488387,0.73104525,0.0008251271,0.2523778,0.015397688,0.00002045469],"about_ca_topic_score_codex":0.004033876,"about_ca_topic_score_gemma":0.0029962885,"teacher_disagreement_score":0.011691345,"about_ca_system_score_codex":0.0011920099,"about_ca_system_score_gemma":0.0014876407,"threshold_uncertainty_score":0.039111376},"labels":[],"label_agreement":null},{"id":"W4252287735","doi":"10.1016/s1464-2859(18)30132-9","title":"SFC order from Asian defence customer, Simark oil &amp; gas order","year":2018,"lang":"en","type":"article","venue":"Fuel Cells Bulletin","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Order (exchange); Power grid; Engineering; German; Power (physics); Fossil fuel; Petroleum engineering; Electrical engineering; Waste management; Business; Finance; Geography; Archaeology; Physics","score_opus":0.00584930395490416,"score_gpt":0.18999024441448806,"score_spread":0.1841409404595839,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4252287735","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00242,0.0004586558,0.0009167449,0.0034513588,0.0020979217,0.000244902,0.0092138015,0.0025349292,0.9786618],"genre_scores_gemma":[0.0036908211,0.0001531607,0.00021030716,0.00039802937,0.00017283317,0.000020979063,0.0020870042,0.00045013367,0.9928167],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99874556,0.000046068533,0.00004438686,0.00013493192,0.00087291334,0.00015603016],"domain_scores_gemma":[0.99652463,0.00017636725,0.00009195168,0.00029671472,0.0024694896,0.00044081028],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0006798225,0.0009461034,0.0006714333,0.0014767775,0.0028437453,0.0034005647,0.00079096906,0.0017204211,0.640176],"category_scores_gemma":[0.0022502216,0.0005433096,0.00040746338,0.001501173,0.0004969512,0.0015383381,0.0007227472,0.0016111303,0.47420475],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057137757,0.00003118295,0.00028908753,0.000034578483,0.0000018466734,0.00009253974,0.000029684177,0.000051029176,0.0008002176,0.0012185106,0.9779414,0.01945276],"study_design_scores_gemma":[0.00002204125,0.00004637098,0.0011596153,0.000019572417,0.000003913677,0.00011880677,0.000068273286,0.00016384831,0.00087400846,0.0002983992,0.99721485,0.000010280589],"about_ca_topic_score_codex":0.04323952,"about_ca_topic_score_gemma":0.08236248,"teacher_disagreement_score":0.640176,"about_ca_system_score_codex":0.0030570056,"about_ca_system_score_gemma":0.0055949823,"threshold_uncertainty_score":0.5132452},"labels":[],"label_agreement":null},{"id":"W4253026764","doi":"10.1017/cbo9781139924672.007","title":"Economics","year":2018,"lang":"en","type":"book-chapter","venue":"Cambridge University Press eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Mathematical optimization; Variety (cybernetics); Convex optimization; Conic optimization; Semidefinite programming; Computer science; Second-order cone programming; Selection (genetic algorithm); Optimization problem; Regular polygon; Class (philosophy); Convex analysis; Mathematics; Artificial intelligence","score_opus":0.010741044038676928,"score_gpt":0.15325981993632357,"score_spread":0.14251877589764664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4253026764","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00084220653,0.01973358,0.006164824,0.00825686,0.0009227767,0.00003154468,0.00040144668,0.00012325474,0.9635236],"genre_scores_gemma":[0.04391097,0.037559025,0.005232951,0.0049513793,0.0015074091,0.00011025638,0.00055865914,0.00023292287,0.9059364],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9995359,0.00007523638,0.000014734605,0.000105515945,0.00021573568,0.000052766653],"domain_scores_gemma":[0.99973136,0.00009033378,0.000018570488,0.0000604611,0.000069326205,0.000029854813],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046179665,0.0006495193,0.00043257972,0.0007206993,0.00104438,0.0033200998,0.0006918718,0.0016496739,0.083590195],"category_scores_gemma":[0.0012747141,0.00021773286,0.00030054757,0.0012044637,0.0019466459,0.0033037895,0.0014484498,0.0022392853,0.031334415],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009347615,0.000012231312,0.000106003456,0.00010853806,0.0000052479445,0.000047458478,0.00013288447,0.00040422156,0.00015144654,0.79188544,0.1417836,0.06535346],"study_design_scores_gemma":[0.0000016383307,0.000004986418,0.00015454926,0.0001109649,0.0000015031687,0.000060412265,0.00004293176,0.0001070565,0.000066465225,0.102252,0.8971939,0.0000035979792],"about_ca_topic_score_codex":0.002342955,"about_ca_topic_score_gemma":0.0031980188,"teacher_disagreement_score":0.083590195,"about_ca_system_score_codex":0.0023391296,"about_ca_system_score_gemma":0.0015486688,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4253122965","doi":"10.1109/tpwrs.2002.804989","title":"Modeling competition in transmission expansion","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Transmission (telecommunications); Competition (biology); Electricity market; Investment (military); Lagrangian relaxation; Electricity; Transmission system; Reliability (semiconductor); Power transmission; Industrial organization; Perfect competition; Computer science; Economics; Engineering; Microeconomics; Telecommunications; Mathematical optimization; Electrical engineering; Power (physics); Mathematics","score_opus":0.013504323132515579,"score_gpt":0.1958320562223181,"score_spread":0.18232773308980255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4253122965","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19427088,0.003861428,0.53849846,0.0066865426,0.0005420316,0.000313224,0.0011649786,0.00025083934,0.2544116],"genre_scores_gemma":[0.94334227,0.0015773461,0.019833513,0.00033947543,0.00020920258,0.00029910725,0.00023964937,0.00009140168,0.034068044],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986613,0.00068182993,0.000033503635,0.00017486411,0.00013872232,0.00030986936],"domain_scores_gemma":[0.9968297,0.0021749723,0.0003421997,0.0000984769,0.0002460555,0.00030857656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019470332,0.0010651682,0.0012968886,0.0009565695,0.0010458585,0.0028756738,0.0023429005,0.0035193558,0.017746536],"category_scores_gemma":[0.006085716,0.0006718292,0.0013463136,0.0016081447,0.002204963,0.00358017,0.0019421227,0.0023014818,0.0009934958],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050120856,0.00006826279,0.00049511995,0.00006569578,0.000028612032,0.00024643235,0.00012001648,0.6498406,0.00026382948,0.34324068,0.0023441033,0.00323647],"study_design_scores_gemma":[0.000048137783,0.000043185217,0.00023169153,0.000019503865,0.000016619466,0.00005709241,0.000088799214,0.8891253,0.000046243706,0.10629385,0.0040127104,0.000016855542],"about_ca_topic_score_codex":0.015738927,"about_ca_topic_score_gemma":0.012351738,"teacher_disagreement_score":0.017746536,"about_ca_system_score_codex":0.0030200821,"about_ca_system_score_gemma":0.0021306896,"threshold_uncertainty_score":0.059368074},"labels":[],"label_agreement":null},{"id":"W4254187592","doi":"10.5383/ijtee.10.02.004","title":"Financial Risk and market Effects for the Congestion Costs of the electricity System in Italy","year":2015,"lang":"en","type":"article","venue":"International Journal of Thermal and Environmental Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity market; Electricity; Business; Electric power system; Grid; Microeconomics; Environmental economics; Industrial organization; Finance; Economics; Power (physics)","score_opus":0.0023592710336569488,"score_gpt":0.1561090303489017,"score_spread":0.15374975931524473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4254187592","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9732283,0.0019480143,0.0029013413,0.002855708,0.000036953097,0.000032948617,0.00028703958,0.000033104272,0.018676514],"genre_scores_gemma":[0.9988136,0.00031765967,0.000104059145,0.000020399133,0.000020270809,0.0000060895827,0.00004094426,0.0000030151657,0.0006739304],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999676,0.00012787645,0.0000129734535,0.00003302944,0.000056116154,0.00009401838],"domain_scores_gemma":[0.9973333,0.0013487021,0.0009642706,0.000057007404,0.00014102944,0.00015567882],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00092299504,0.0002948424,0.00033593617,0.0010382294,0.0004020977,0.0019411802,0.0003889153,0.00074025337,0.00387056],"category_scores_gemma":[0.004874795,0.00020974087,0.00045172876,0.0007625195,0.00090273994,0.0014240058,0.00066079694,0.0011073474,0.00011316346],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016123983,0.0006761358,0.22779854,0.00044668588,0.00034918144,0.0057771006,0.0011706318,0.35294715,0.0024672975,0.3466289,0.01827049,0.041855395],"study_design_scores_gemma":[0.00017232326,0.00052602234,0.3550145,0.00018169884,0.00033387195,0.0012428733,0.0016193993,0.5492666,0.0007312798,0.08336776,0.007360751,0.00018293975],"about_ca_topic_score_codex":0.015673416,"about_ca_topic_score_gemma":0.011886559,"teacher_disagreement_score":0.015673416,"about_ca_system_score_codex":0.0020161297,"about_ca_system_score_gemma":0.0006307299,"threshold_uncertainty_score":0.031164408},"labels":[],"label_agreement":null},{"id":"W4255106024","doi":"10.2139/ssrn.3979516","title":"Kriging Surrogate Model Enabled Heuristic Algorithm for Coordinated Volt/Var Management in Active Distribution Networks","year":2021,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nexen (Canada)","funders":"","keywords":"Volt; Kriging; Surrogate model; Computer science; Heuristic; Mathematical optimization; Algorithm; Artificial intelligence; Machine learning; Mathematics; Engineering; Voltage; Electrical engineering","score_opus":0.004160660196032878,"score_gpt":0.2055503201266053,"score_spread":0.20138965993057242,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255106024","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04020851,0.00016280347,0.95458114,0.00010736675,0.00003757046,0.00003798502,0.000058820795,0.00049438945,0.004311395],"genre_scores_gemma":[0.81257427,0.00009524446,0.18451588,0.000056179822,0.000017689774,0.00012492407,0.00013368377,0.000094372226,0.002387778],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997559,0.00011447268,0.0000084723115,0.000025875674,0.000054099884,0.0000411977],"domain_scores_gemma":[0.9995946,0.00021674857,0.000044981494,0.000028358245,0.00009499325,0.000020397432],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006056865,0.00055111747,0.000888363,0.00042731257,0.0003936527,0.00072813785,0.00065978785,0.0008469974,0.0017598765],"category_scores_gemma":[0.0012161615,0.00046807565,0.00048660784,0.00056113745,0.0002683894,0.00046640082,0.00057344604,0.0009209127,0.00032577294],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002728544,0.000016607304,0.00010452817,0.000010679385,0.000008175622,0.0000107520655,0.000010872044,0.98838156,0.00033334465,0.00064649986,0.00018232783,0.010267411],"study_design_scores_gemma":[0.0000025143536,0.000009301792,0.000021432135,0.0000013156422,0.0000015432048,0.000002030951,0.0000019729741,0.9995975,0.00007904253,0.00021573024,0.000066745524,8.6451354e-7],"about_ca_topic_score_codex":0.008031672,"about_ca_topic_score_gemma":0.008765919,"teacher_disagreement_score":0.008031672,"about_ca_system_score_codex":0.0005287308,"about_ca_system_score_gemma":0.0011297814,"threshold_uncertainty_score":0.015969813},"labels":[],"label_agreement":null},{"id":"W4255379149","doi":"10.32920/ryerson.14647647","title":"A secondary option market design for reserve procurement by renewable energy sources","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Intermittency; Wind power; Governor; Renewable energy; Electric power system; Procurement; Automatic Generation Control; Electricity generation; Computer science; Reliability engineering; Load balancing (electrical power); Automotive engineering; Power (physics); Control engineering; Engineering; Business; Electrical engineering; Meteorology","score_opus":0.01454284087538483,"score_gpt":0.20484123753440123,"score_spread":0.1902983966590164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255379149","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01204434,0.00042330043,0.93745404,0.0010900545,0.00023098636,0.00020086979,0.00024239944,0.00023467357,0.048079364],"genre_scores_gemma":[0.77076125,0.00079409697,0.16306032,0.00046980692,0.00039052617,0.00078028813,0.00031063598,0.00030440267,0.06312865],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986304,0.0007901146,0.000047347636,0.0001930462,0.00021954859,0.000119522214],"domain_scores_gemma":[0.9986701,0.0007035254,0.0001280156,0.00013632739,0.00021797547,0.00014412617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030072967,0.0013262022,0.0012323926,0.0006119419,0.00075565436,0.0029399474,0.0016790609,0.0017841425,0.029794976],"category_scores_gemma":[0.0057111415,0.0005843037,0.0013391242,0.0007129992,0.001361577,0.0032792217,0.0017101534,0.0019434163,0.002415188],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024166577,0.00014552221,0.00023846814,0.00026616134,0.000068103815,0.00030075118,0.00010737659,0.15286046,0.0030434523,0.80079263,0.009093417,0.03284209],"study_design_scores_gemma":[0.00009592499,0.00019783,0.0001274934,0.0000423775,0.000040446885,0.00014479904,0.0000423097,0.7054992,0.00081095373,0.28081998,0.012148696,0.000030041956],"about_ca_topic_score_codex":0.00069085875,"about_ca_topic_score_gemma":0.0009505774,"teacher_disagreement_score":0.029794976,"about_ca_system_score_codex":0.0011678081,"about_ca_system_score_gemma":0.0018006715,"threshold_uncertainty_score":0.099674046},"labels":[],"label_agreement":null},{"id":"W4256047829","doi":"10.22215/etd/2012-09447","title":"Public policy and economic efficiency in Ontario's electric market : 2002 to 2011","year":2012,"lang":"en","type":"dissertation","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University; Canadian Heritage; Library and Archives Canada","funders":"","keywords":"Political science; Humanities; Library science; Computer science; Art","score_opus":0.008253189349752126,"score_gpt":0.2004487545828023,"score_spread":0.19219556523305018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4256047829","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8011104,0.0026211978,0.0005367494,0.03073591,0.00012723201,0.00009441744,0.03191493,0.00007933734,0.13277984],"genre_scores_gemma":[0.93825746,0.0010052342,0.00012858036,0.0006103735,0.00005495772,0.000024774457,0.0037426031,0.00002427362,0.05615174],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987877,0.000061207975,0.00004600225,0.000083033214,0.0005104069,0.0005117424],"domain_scores_gemma":[0.994463,0.00072196074,0.0011770875,0.00014476692,0.002686785,0.0008063927],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009521641,0.00013097882,0.00026274586,0.00084990944,0.001402696,0.0031492333,0.00062483404,0.00079539855,0.0075670714],"category_scores_gemma":[0.006091621,0.00025061553,0.0003263023,0.0023368374,0.0009979906,0.001250391,0.0008041334,0.00079438474,0.00054934487],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011033139,0.0002932804,0.6516843,0.00049076736,0.00025304928,0.0007262,0.0068812896,0.016105928,0.001156037,0.067036316,0.18515104,0.06911859],"study_design_scores_gemma":[0.000049974504,0.00003211563,0.884643,0.000081676386,0.000036952177,0.000039032773,0.00374019,0.0026377307,0.00033767667,0.0010876001,0.10728324,0.000030832092],"about_ca_topic_score_codex":0.9839091,"about_ca_topic_score_gemma":0.99540114,"teacher_disagreement_score":0.07029955,"about_ca_system_score_codex":0.07029955,"about_ca_system_score_gemma":0.05125048,"threshold_uncertainty_score":0.5100613},"labels":[],"label_agreement":null},{"id":"W4281967110","doi":"10.1016/j.ijepes.2022.108343","title":"Integration of machine learning with economic energy scheduling","year":2022,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Computer science; Range (aeronautics); Power (physics); Scheduling (production processes); Electric power system; Algorithm; Engineering; Mathematics","score_opus":0.004197431195464159,"score_gpt":0.19169579307417006,"score_spread":0.18749836187870592,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281967110","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022249835,0.0009780965,0.9660868,0.0006791052,0.0002021806,0.0000678363,0.0001016087,0.0007894785,0.0088450415],"genre_scores_gemma":[0.77317077,0.0008444057,0.2203644,0.00017522984,0.00025932904,0.000158144,0.00027762842,0.00013786543,0.0046122097],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993166,0.00031751182,0.000038350317,0.00008939891,0.00017965151,0.000058513055],"domain_scores_gemma":[0.9980438,0.0014212371,0.00011988773,0.00011353644,0.00024991896,0.00005148077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001454441,0.00090499845,0.0011218196,0.00093439047,0.0003344772,0.0012124694,0.0010245513,0.0007388175,0.002592604],"category_scores_gemma":[0.0039550276,0.0004954313,0.000543722,0.0013636085,0.00046219764,0.0013376971,0.0009574485,0.0011087856,0.0005255936],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013490854,0.000027920396,0.00031216998,0.00001996835,0.000021493432,0.000017449058,0.0000072434327,0.9711019,0.000084477215,0.0040031825,0.00025193288,0.02413887],"study_design_scores_gemma":[0.000001487563,0.000003228688,0.00003498952,0.0000016190999,0.000001456932,0.000001524717,0.0000012183065,0.99726665,0.000039812723,0.002430696,0.00021605124,0.0000012006556],"about_ca_topic_score_codex":0.008093214,"about_ca_topic_score_gemma":0.007533781,"teacher_disagreement_score":0.008093214,"about_ca_system_score_codex":0.001091778,"about_ca_system_score_gemma":0.0013397206,"threshold_uncertainty_score":0.016092181},"labels":[],"label_agreement":null},{"id":"W4283793830","doi":"10.1016/j.eneco.2022.106169","title":"How do variable renewable energy technologies affect firm-level day-ahead output decisions: Evidence from the Turkish wholesale electricity market","year":2022,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"North Dakota Agricultural Experiment Station","keywords":"Renewable energy; Electricity market; Panel data; Economics; Turkish; Electricity; Industrial organization; Variable (mathematics); Variable renewable energy; Business; Microeconomics; Econometrics; Energy storage","score_opus":0.018237842630455952,"score_gpt":0.18675329401588972,"score_spread":0.16851545138543378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283793830","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9968424,0.00042248057,0.0002574267,0.00027240106,0.000022628361,0.0000048391207,0.00043767437,0.000012888899,0.0017273994],"genre_scores_gemma":[0.9991979,0.00012181969,0.000018436753,0.000024352323,0.000009123755,0.0000011549341,0.00034446162,0.0000039189176,0.00027877706],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995223,0.00011401595,0.000030936713,0.00011763229,0.00005634695,0.000158637],"domain_scores_gemma":[0.9960233,0.0022450404,0.0011051503,0.00017683045,0.00024028904,0.00020930459],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00081304385,0.00038470223,0.00050611247,0.0004534789,0.00030577366,0.0024624693,0.0005793424,0.001132253,0.0054291547],"category_scores_gemma":[0.0035348313,0.00024469336,0.00077043043,0.00072299794,0.00058325595,0.001708544,0.00045139666,0.0010326491,0.0009725736],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.007034767,0.0014961779,0.861315,0.0003662297,0.0016373715,0.0020775849,0.0005410486,0.07033445,0.005095382,0.008854177,0.0063425484,0.03490528],"study_design_scores_gemma":[0.00022564757,0.00052611134,0.9352374,0.000029790948,0.0005906154,0.00016864527,0.001619305,0.050899155,0.0015443458,0.0055836327,0.003472936,0.00010253622],"about_ca_topic_score_codex":0.009349505,"about_ca_topic_score_gemma":0.008320171,"teacher_disagreement_score":0.009349505,"about_ca_system_score_codex":0.0006779436,"about_ca_system_score_gemma":0.00028798115,"threshold_uncertainty_score":0.018590152},"labels":[],"label_agreement":null},{"id":"W4283829705","doi":"10.18280/mmep.090307","title":"Dynamic Economic Load Dispatch Using Linear Programming and Mathematical-Based Models","year":2022,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Mathematical optimization; Computer science; Linearization; Linear programming; Piecewise linear function; Optimization problem; Process (computing); Electric power system; Software; Power (physics); Mathematics; Nonlinear system","score_opus":0.0162046339800606,"score_gpt":0.199507341369815,"score_spread":0.18330270738975438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283829705","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0039009645,0.00018980721,0.9889882,0.00012137842,0.000021166315,0.000047273294,0.00008657498,0.00018979436,0.0064548515],"genre_scores_gemma":[0.5530756,0.001720803,0.4278999,0.00014064019,0.00010324891,0.00086472835,0.00057265756,0.00028307544,0.015339412],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995327,0.0001915165,0.000022826596,0.00004819362,0.0001729559,0.000031693224],"domain_scores_gemma":[0.9995646,0.00027476426,0.00006880009,0.000022941664,0.000058415717,0.000010551549],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066289416,0.0009092436,0.00078330963,0.00068177865,0.00029523647,0.0014454887,0.0010837865,0.00065728865,0.0036966375],"category_scores_gemma":[0.001378652,0.0006310122,0.0008122586,0.0011827068,0.0005510568,0.0013273477,0.0006977059,0.0011493132,0.000838404],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000062000263,0.000010103332,0.000040023184,0.000031631578,0.00000639314,0.000009833757,0.000006944316,0.98695034,0.00021207285,0.0076282695,0.00018561965,0.0049126563],"study_design_scores_gemma":[0.000002442094,0.0000048621664,0.000017591865,0.000003355981,0.0000011803013,0.0000028202203,0.0000023853343,0.9971455,0.000122028985,0.0022596722,0.00043615155,0.0000020678242],"about_ca_topic_score_codex":0.0041776034,"about_ca_topic_score_gemma":0.004725123,"teacher_disagreement_score":0.0041776034,"about_ca_system_score_codex":0.0010305862,"about_ca_system_score_gemma":0.000994044,"threshold_uncertainty_score":0.012366533},"labels":[],"label_agreement":null},{"id":"W4285294500","doi":"10.1109/icjece.2022.3153311","title":"Optical Energy Policy for Electricity Tariff: An Optimization Approach Over Price Integration","year":2022,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Tariff; Particle swarm optimization; Electricity; Economics; Genetic algorithm; Industrial organization; Business; Microeconomics; Econometrics; Environmental economics; Mathematical optimization; International economics; Engineering; Electrical engineering; Mathematics","score_opus":0.004348538602430335,"score_gpt":0.16694746444979008,"score_spread":0.16259892584735974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285294500","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026607605,0.00040632734,0.9606677,0.000584652,0.00009550696,0.0001242498,0.00006136111,0.00008130662,0.011371241],"genre_scores_gemma":[0.7535857,0.0006749492,0.23826014,0.00020667147,0.000118571144,0.0002082235,0.00009857483,0.00009776724,0.0067493627],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995009,0.00024190028,0.000020370055,0.000076640514,0.000115277835,0.000044821194],"domain_scores_gemma":[0.9996656,0.00018099617,0.00005817832,0.000019179448,0.00006188587,0.000014193151],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012812798,0.00074466836,0.00079688785,0.0008513896,0.00040456478,0.0015572498,0.00081901136,0.0010732082,0.0027616092],"category_scores_gemma":[0.0022044564,0.00041926504,0.00067281176,0.0013435225,0.0005567534,0.0015402692,0.00052116765,0.0011390005,0.00024324283],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028330556,0.00005307918,0.0007895132,0.000061535124,0.000035805802,0.00004973998,0.000037822898,0.94136053,0.00079989614,0.02885002,0.0006328345,0.027300926],"study_design_scores_gemma":[0.0000041590433,0.000019713767,0.00018939852,0.000008554933,0.0000089604055,0.000012632102,0.00001633953,0.9941711,0.00020293273,0.004694416,0.00066761137,0.000004198877],"about_ca_topic_score_codex":0.0053719976,"about_ca_topic_score_gemma":0.004515866,"teacher_disagreement_score":0.0053719976,"about_ca_system_score_codex":0.0012134493,"about_ca_system_score_gemma":0.0017362481,"threshold_uncertainty_score":0.01068145},"labels":[],"label_agreement":null},{"id":"W4286744901","doi":"10.2139/ssrn.4157798","title":"Pricing Inconsistency Between the Futures and Transmission Congestion Contract Markets in the NYISO","year":2022,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal; Concordia University","funders":"","keywords":"Futures contract; Business; Financial economics; Forward market; Transmission (telecommunications); Economics; Microeconomics; Telecommunications; Computer science","score_opus":0.004094091497630467,"score_gpt":0.19381615806786934,"score_spread":0.18972206657023888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4286744901","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93844074,0.0004803906,0.0187385,0.0042850752,0.000073165946,0.000047904625,0.0003947254,0.0000817948,0.037457682],"genre_scores_gemma":[0.9964561,0.000100426354,0.00093355356,0.000059253245,0.000048372804,0.000013061896,0.000083651765,0.000017856475,0.0022877168],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9989785,0.00042423024,0.000055393728,0.00016611883,0.00019300781,0.00018271347],"domain_scores_gemma":[0.9896431,0.007095409,0.0015484738,0.00042809243,0.0007369865,0.00054800266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041015823,0.00025118224,0.0014603421,0.0008549771,0.0011273425,0.005073243,0.001576459,0.0016663199,0.012218021],"category_scores_gemma":[0.023278933,0.00041150453,0.0006150359,0.0009002352,0.0020576594,0.007061796,0.0013639423,0.003731786,0.00024649405],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013864816,0.00027336285,0.016077342,0.00016160234,0.000103240425,0.0010081006,0.0007790678,0.06474979,0.0013270418,0.88989323,0.005983711,0.018257035],"study_design_scores_gemma":[0.00032045707,0.00017512019,0.0289196,0.000065567634,0.00009623298,0.00031964638,0.0016075413,0.44887078,0.000594817,0.5154829,0.0034304338,0.000116947274],"about_ca_topic_score_codex":0.012017819,"about_ca_topic_score_gemma":0.008193949,"teacher_disagreement_score":0.012218021,"about_ca_system_score_codex":0.0026550337,"about_ca_system_score_gemma":0.0014423439,"threshold_uncertainty_score":0.04087335},"labels":[],"label_agreement":null},{"id":"W4292291461","doi":"10.1049/esi2.12078","title":"Day‐ahead unit commitment for hydro‐thermal coordination with high participation of wind power","year":2022,"lang":"en","type":"article","venue":"IET Energy Systems Integration","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Power system simulation; Integer programming; Mathematical optimization; Computer science; Linear programming; Stochastic programming; Computation; Wind power; Electric power system; Reduction (mathematics); Unit (ring theory); Operations research; Power (physics); Engineering; Mathematics; Algorithm","score_opus":0.009660343172500084,"score_gpt":0.21171714137898956,"score_spread":0.20205679820648947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4292291461","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5257103,0.0005051024,0.45378986,0.00040376274,0.0000915119,0.000257452,0.00044333964,0.00051561114,0.018283019],"genre_scores_gemma":[0.987951,0.000033206266,0.010723368,0.0000131633215,0.0000057566754,0.000042281194,0.00005767867,0.00001563046,0.0011579681],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999772,0.00010014675,0.000007802283,0.000036361595,0.00003828694,0.00004553799],"domain_scores_gemma":[0.9995567,0.00027385406,0.000042290558,0.000026999802,0.000052406765,0.000047733196],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006523864,0.0006154387,0.00077793293,0.00029169774,0.000385843,0.00088392134,0.00075295375,0.00063802564,0.004378352],"category_scores_gemma":[0.0010164542,0.0004228,0.00031089256,0.00048268912,0.0004248599,0.00044195572,0.0005454435,0.00081607606,0.00021834718],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007028033,0.0000142332065,0.0001517129,0.00002008146,0.00001527797,0.00004544044,0.000011867986,0.9937552,0.00035008843,0.0008967907,0.00021216308,0.0044568456],"study_design_scores_gemma":[0.000011279045,0.000018214458,0.000106385574,0.0000014800333,0.0000025700895,0.0000036164383,0.0000064924466,0.9992725,0.00013517305,0.00034635613,0.00009370801,0.0000021792541],"about_ca_topic_score_codex":0.022242201,"about_ca_topic_score_gemma":0.019303955,"teacher_disagreement_score":0.022242201,"about_ca_system_score_codex":0.0009512188,"about_ca_system_score_gemma":0.0010841102,"threshold_uncertainty_score":0.044225454},"labels":[],"label_agreement":null},{"id":"W4292847831","doi":"10.2139/ssrn.4196464","title":"Multi-Criteria Renewable Auction Modeling Considering the Carbon Footprint Certification of Photovoltaic Modules","year":2022,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nexen (Canada)","funders":"","keywords":"Certification; Renewable energy; Carbon footprint; Photovoltaic system; Environmental economics; Business; Computer science; Economics; Engineering; Greenhouse gas; Electrical engineering","score_opus":0.017143968348130128,"score_gpt":0.2197904098697919,"score_spread":0.20264644152166178,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4292847831","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44286212,0.0010571663,0.4893185,0.001227255,0.00023909494,0.00019686836,0.00060711533,0.00024369027,0.06424823],"genre_scores_gemma":[0.99004465,0.00010279588,0.0039547016,0.000031935182,0.000012910329,0.00004506814,0.000058579146,0.0000258731,0.0057234773],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994824,0.0002106447,0.00001629453,0.000060445873,0.000092000424,0.00013814654],"domain_scores_gemma":[0.9985784,0.00081434025,0.00013501925,0.000060784056,0.00029120778,0.00012029931],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001553037,0.00075328175,0.0016808497,0.00060586055,0.00057154876,0.0024753627,0.0019461523,0.0024089725,0.0057073953],"category_scores_gemma":[0.002727289,0.00073289196,0.0014850484,0.0010062524,0.0008078203,0.0012482449,0.0008412336,0.001308777,0.00036513092],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001501957,0.000011276485,0.000115060844,0.000012394722,0.0000073480355,0.00004517512,0.0000049267633,0.99703836,0.000111626134,0.0020178617,0.00008927229,0.00053177524],"study_design_scores_gemma":[0.0000042644465,0.0000085220845,0.000063831394,0.0000022813467,0.0000037076381,0.0000050742356,0.0000069232137,0.9992079,0.00003455113,0.000615006,0.000045684366,0.0000022559168],"about_ca_topic_score_codex":0.01749184,"about_ca_topic_score_gemma":0.011893238,"teacher_disagreement_score":0.01749184,"about_ca_system_score_codex":0.001642625,"about_ca_system_score_gemma":0.0014209991,"threshold_uncertainty_score":0.034780085},"labels":[],"label_agreement":null},{"id":"W4293371009","doi":"10.1109/oajpe.2022.3202131","title":"A Zonal Capacity Market Model With Energy Storage for Transmission and Distribution","year":2022,"lang":"en","type":"article","venue":"IEEE Open Access Journal of Power and Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University; University of Waterloo","funders":"Independent Electricity System Operator; Natural Sciences and Engineering Research Council of Canada; Mitacs; Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Electric power transmission; Distributed generation; Transmission (telecommunications); Computer science; Transmission system; Activity-based costing; Electric power system; Mathematical optimization; Power transmission; Economics; Power (physics); Operations research; Renewable energy; Telecommunications; Electrical engineering; Engineering; Mathematics","score_opus":0.01666545183172079,"score_gpt":0.24889487481892053,"score_spread":0.23222942298719973,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293371009","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21755299,0.0013757957,0.6275472,0.0022773575,0.00029663037,0.00045032694,0.0032133686,0.0007327235,0.14655359],"genre_scores_gemma":[0.94629896,0.0004979998,0.019866245,0.00009010979,0.000042186588,0.00018807467,0.0003127744,0.000048829796,0.032654908],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961424,0.00013251136,0.000011601693,0.00007051188,0.00008066207,0.000090460424],"domain_scores_gemma":[0.99955577,0.00014921198,0.00007200112,0.000027068794,0.0001419681,0.00005404667],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006618797,0.00087488315,0.00060614565,0.00059273397,0.0007044852,0.0019472241,0.0024974097,0.0012488782,0.011115412],"category_scores_gemma":[0.0010955893,0.00038893145,0.0007361829,0.0011711529,0.0008822456,0.0017612099,0.0008325815,0.00095199846,0.0007065261],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000064628366,0.000021968532,0.0002774593,0.00003460162,0.000018505887,0.00013977324,0.000042160977,0.955459,0.00064342434,0.03935497,0.0013512721,0.002592261],"study_design_scores_gemma":[0.000013674325,0.000016768201,0.0001393615,0.0000032007308,0.000008605515,0.0000192584,0.00002589796,0.9953244,0.00007238341,0.003226353,0.0011422974,0.000007884944],"about_ca_topic_score_codex":0.070076115,"about_ca_topic_score_gemma":0.0648432,"teacher_disagreement_score":0.070076115,"about_ca_system_score_codex":0.0025284702,"about_ca_system_score_gemma":0.0021894034,"threshold_uncertainty_score":0.13933647},"labels":[],"label_agreement":null},{"id":"W4297900749","doi":"10.1109/59.918302","title":"A practical hydro, dynamic unit commitment and loading model","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; Burnaby Hospital","funders":"","keywords":"Power system simulation; Schedule; Hydroelectricity; Dynamic programming; Mathematical optimization; Unit (ring theory); Computer science; Production schedule; Engineering; Electric power system; Scheduling (production processes); Power (physics); Mathematics","score_opus":0.019011430375225007,"score_gpt":0.25362840021965627,"score_spread":0.23461696984443126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4297900749","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09153123,0.00039953832,0.7040465,0.0029092075,0.00021027762,0.0006602915,0.0077848635,0.0014527565,0.19100544],"genre_scores_gemma":[0.7891289,0.00060936617,0.11413912,0.00040275184,0.00008121907,0.0008972364,0.0024022239,0.00020239799,0.0921369],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970764,0.00006808135,0.000012988398,0.00006830272,0.000108756336,0.00003415551],"domain_scores_gemma":[0.9996959,0.00011625241,0.000046869543,0.00003793259,0.00006404449,0.000039072333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041086422,0.00054756436,0.0005070541,0.00035670004,0.00061347627,0.0011312971,0.0015626171,0.0012028601,0.014106005],"category_scores_gemma":[0.001044796,0.00059792894,0.00030022798,0.00092273834,0.0007878423,0.0012590092,0.00083278626,0.0011053513,0.0020861996],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028303224,0.000025209374,0.0002358338,0.000033919652,0.000005215591,0.000087028966,0.000022964365,0.9724983,0.00055719813,0.019344503,0.0019473282,0.0052141123],"study_design_scores_gemma":[0.000041862662,0.000030036364,0.00020422117,0.000004831253,0.000004878055,0.000043510565,0.00002029484,0.9837151,0.00023615858,0.008134932,0.007552993,0.000011152347],"about_ca_topic_score_codex":0.017540041,"about_ca_topic_score_gemma":0.015078158,"teacher_disagreement_score":0.017540041,"about_ca_system_score_codex":0.0013335509,"about_ca_system_score_gemma":0.0022192597,"threshold_uncertainty_score":0.047189295},"labels":[],"label_agreement":null},{"id":"W4300559365","doi":"10.1561/3100000014","title":"Unit Commitment in Electric Energy Systems","year":2017,"lang":"en","type":"article","venue":"Foundations and Trends® in Electric Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":67,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Unit (ring theory); Energy (signal processing); Power system simulation; Computer science; Business; Electric power system; Psychology; Physics; Mathematics; Power (physics); Statistics","score_opus":0.01472480546752325,"score_gpt":0.23711929516984376,"score_spread":0.2223944897023205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4300559365","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010510185,0.056586012,0.7058366,0.0056570675,0.00185449,0.00010970894,0.00058972964,0.00047208433,0.21838412],"genre_scores_gemma":[0.7187742,0.07000579,0.12071871,0.0015511349,0.002024362,0.00043034478,0.0010974916,0.00043090596,0.08496707],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991757,0.00029947248,0.00003256302,0.00016674769,0.00026382398,0.00006170483],"domain_scores_gemma":[0.99966013,0.00017911509,0.00003492253,0.000037365604,0.000068683155,0.000019834053],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065057346,0.00080536463,0.00080287346,0.00040115716,0.00045331448,0.0017606843,0.001212183,0.001149317,0.009358361],"category_scores_gemma":[0.0017137888,0.00037140914,0.0004124909,0.002052447,0.0008845781,0.0018442938,0.001014309,0.002272615,0.0022115654],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002991921,0.000033227418,0.00022167579,0.00038696686,0.00004373151,0.00012443225,0.00007845359,0.21426931,0.0006493659,0.6624108,0.021669392,0.100082695],"study_design_scores_gemma":[0.000024401144,0.000040966337,0.00030177328,0.00021136258,0.000018595198,0.00014991796,0.000071791284,0.2562623,0.00056078116,0.6473759,0.09495159,0.000030558407],"about_ca_topic_score_codex":0.0023436807,"about_ca_topic_score_gemma":0.0016820264,"teacher_disagreement_score":0.009358361,"about_ca_system_score_codex":0.0010175054,"about_ca_system_score_gemma":0.0008396579,"threshold_uncertainty_score":0.031306863},"labels":[],"label_agreement":null},{"id":"W4301368800","doi":"10.7202/1092246ar","title":"Accès au très haut débit et développement territorial en période d’incertitude : note éditoriale","year":2022,"lang":"fr","type":"article","venue":"Canadian Journal of Regional Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"Political science","score_opus":0.0144710353570674,"score_gpt":0.25500623915098913,"score_spread":0.24053520379392174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4301368800","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00017214488,0.014385817,0.000381424,0.25172186,0.7304349,0.000037177106,0.00036516687,0.000045907254,0.0024555994],"genre_scores_gemma":[0.0059966333,0.026142968,0.0009691754,0.14501005,0.8027851,0.00012109245,0.00016687016,0.000117134936,0.018691087],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9946561,0.0008823966,0.0007618408,0.00091407204,0.0023121382,0.0004734818],"domain_scores_gemma":[0.9576967,0.020796223,0.0019976438,0.0009076078,0.0169308,0.0016710211],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0055454103,0.001305452,0.0017627506,0.0019687908,0.003062099,0.0047319746,0.0033395563,0.017798278,0.009345144],"category_scores_gemma":[0.040449563,0.00062729296,0.0018753463,0.0021445723,0.003106225,0.002950382,0.0015766503,0.013413544,0.0043257065],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036081256,0.0000064741976,0.00006863835,0.00023902048,0.0000133234325,0.000085352745,0.00003749189,0.000046499183,0.00009171023,0.0007399218,0.99482673,0.0038086986],"study_design_scores_gemma":[0.000038126316,0.000020028598,0.0008634014,0.0005749838,0.000046489076,0.00014507576,0.0001245608,0.00015770999,0.00029041988,0.001510873,0.99619496,0.000033391425],"about_ca_topic_score_codex":0.038831726,"about_ca_topic_score_gemma":0.04772526,"teacher_disagreement_score":0.9611683,"about_ca_system_score_codex":0.0058052177,"about_ca_system_score_gemma":0.00773395,"threshold_uncertainty_score":0.07721138},"labels":[],"label_agreement":null},{"id":"W4302379523","doi":"10.48550/arxiv.1711.04175","title":"Optimal Subhourly Electricity Resource Dispatch Under Multiple Price\\n Signals With High Renewable Generation Availability","year":2017,"lang":"","type":"preprint","venue":"arXiv (Cornell University)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"SLAC National Accelerator Laboratory; Pacific Institute for Climate Solutions; University of Victoria; California Energy Commission; U.S. Department of Energy","keywords":"Economic dispatch; Renewable energy; Computer science; Electricity; Electric power system; Optimal control; Resource (disambiguation); Interconnection; Mathematical optimization; Electricity generation; Trajectory; Power (physics); Engineering; Telecommunications; Electrical engineering; Mathematics","score_opus":0.03990896657719968,"score_gpt":0.17006920997525438,"score_spread":0.1301602433980547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4302379523","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4744091,0.00032630385,0.50731057,0.00072976004,0.000107012485,0.000077092176,0.0002464208,0.0003164504,0.016477285],"genre_scores_gemma":[0.98815805,0.000046095378,0.010569063,0.0000210516,0.000013284435,0.000013833599,0.000033598837,0.0000180051,0.0011270518],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997508,0.00009794744,0.000007668582,0.000036297766,0.00004714909,0.000060081074],"domain_scores_gemma":[0.9995509,0.00024954294,0.00008261055,0.000018770506,0.000048567344,0.00004963689],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005769039,0.00057304255,0.00075961335,0.00029714315,0.00024448233,0.0008984935,0.00048251546,0.0005624713,0.0012906705],"category_scores_gemma":[0.0015372729,0.00038410403,0.00021845233,0.00031759476,0.00044052332,0.0008353115,0.0004292287,0.00059161923,0.00013533303],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052247065,0.000014675938,0.00018040036,0.000009178145,0.000009100035,0.00004229547,0.000009694598,0.9917571,0.0006277171,0.0033116895,0.00027489042,0.003711115],"study_design_scores_gemma":[0.0000064317524,0.000011967366,0.00009415756,5.192886e-7,0.0000015655413,0.0000030112346,0.0000062798504,0.9986089,0.00012518803,0.001092578,0.00004746072,0.0000019492306],"about_ca_topic_score_codex":0.0058303424,"about_ca_topic_score_gemma":0.006145779,"teacher_disagreement_score":0.0058303424,"about_ca_system_score_codex":0.0008302068,"about_ca_system_score_gemma":0.00085159845,"threshold_uncertainty_score":0.011592805},"labels":[],"label_agreement":null},{"id":"W4307237985","doi":"10.26443/glsars.v2i1.187","title":"Study of Legal Adaptation in China's Wind Power Development","year":2022,"lang":"en","type":"article","venue":"McGill GLSA Research Series","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Renewable energy; Wind power; China; Electricity; Electricity generation; Electricity market; Business; Energy development; Environmental economics; Energy law; Nameplate capacity; Economics; Market economy; Power (physics); Engineering; Law; Electrical engineering; Environmental law; Political science","score_opus":0.036248948055220165,"score_gpt":0.28499025713667875,"score_spread":0.24874130908145858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307237985","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92535985,0.00065550685,0.006073688,0.004851077,0.00004208433,0.00014642971,0.00007091312,0.00001865441,0.062781855],"genre_scores_gemma":[0.99691004,0.00025601508,0.00032951953,0.00010901391,0.000010731629,0.000025500953,0.000013602894,0.0000020101809,0.002343717],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988336,0.00035095838,0.000047974394,0.00011800422,0.00023958391,0.00040991785],"domain_scores_gemma":[0.998645,0.00056399195,0.0003326036,0.00005018198,0.00019750759,0.00021065236],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014083929,0.0001951917,0.00035360982,0.0011913686,0.0018332632,0.002169541,0.00087315385,0.0012599947,0.0025233917],"category_scores_gemma":[0.0032179505,0.0002006813,0.0007054332,0.0013208626,0.0023847453,0.0021995313,0.0014278656,0.0016950025,0.00006121206],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003529115,0.00032744778,0.0626462,0.00013893457,0.000070143884,0.0037967716,0.006139348,0.036835995,0.00088088104,0.86731046,0.0036138152,0.018204644],"study_design_scores_gemma":[0.00010850282,0.00033422667,0.18480174,0.00030574636,0.00018847465,0.00081217085,0.025715549,0.49470186,0.0014520992,0.24622338,0.04517711,0.00017915588],"about_ca_topic_score_codex":0.0764289,"about_ca_topic_score_gemma":0.05288537,"teacher_disagreement_score":0.0764289,"about_ca_system_score_codex":0.008694115,"about_ca_system_score_gemma":0.009406815,"threshold_uncertainty_score":0.15196806},"labels":[],"label_agreement":null},{"id":"W4310174523","doi":"10.1109/isgt-europe54678.2022.9960363","title":"AC Multi-Stage Transmission Network Expansion Planning considering a Multi-Voltage Approach","year":2022,"lang":"en","type":"article","venue":"2022 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT-Europe)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Compensation (psychology); AC power; Voltage; Transmission (telecommunications); Mathematical optimization; Computer science; Electric power system; Heuristic; Transmission system; Control theory (sociology); Power (physics); Electronic engineering; Engineering; Electrical engineering; Mathematics; Telecommunications","score_opus":0.057483140714846157,"score_gpt":0.25964845021702637,"score_spread":0.2021653095021802,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310174523","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.118634306,0.00045366123,0.8691154,0.00027572445,0.000041712694,0.0001492368,0.00015578374,0.0002289008,0.010945254],"genre_scores_gemma":[0.9371226,0.00018338134,0.05866509,0.000034821758,0.000014188374,0.00012422101,0.000088167246,0.000024862124,0.0037426208],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997143,0.000104357096,0.000009353051,0.00005254275,0.00006646866,0.000053025444],"domain_scores_gemma":[0.9996177,0.00020760532,0.000052423457,0.000016011307,0.000078973004,0.000027171525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004548617,0.0006082991,0.00069239485,0.0005560814,0.0003719697,0.0008190782,0.0008248487,0.0009150674,0.0025805703],"category_scores_gemma":[0.0009031894,0.000549047,0.00060090766,0.0007385756,0.00032709748,0.00093157473,0.00046418735,0.0006970569,0.0001382612],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009278081,0.0000076134547,0.000101220976,0.000009953017,0.0000045274583,0.000027166254,0.000005822216,0.9962036,0.00024494927,0.0006235735,0.00006288623,0.0026993677],"study_design_scores_gemma":[0.0000024272845,0.000011484639,0.000045840265,0.00000123992,0.0000027252927,0.000004268903,0.000003410689,0.999432,0.00007926881,0.00033282067,0.00008312982,0.0000012094554],"about_ca_topic_score_codex":0.010438884,"about_ca_topic_score_gemma":0.011499917,"teacher_disagreement_score":0.010438884,"about_ca_system_score_codex":0.00081762264,"about_ca_system_score_gemma":0.00087864837,"threshold_uncertainty_score":0.020756245},"labels":[],"label_agreement":null},{"id":"W4312253434","doi":"10.1109/tpwrs.2022.3217941","title":"Distributionally Robust Optimal Power Flow via Ellipsoidal Approximation","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Probabilistic logic; Renewable energy; Robust optimization; Computer science; Schedule; Electric power system; Upper and lower bounds; Probability distribution; Power flow; Power (physics); Engineering; Mathematics","score_opus":0.007296792219374998,"score_gpt":0.18119723446507371,"score_spread":0.17390044224569873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312253434","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004795116,0.00011392456,0.9930521,0.0001055712,0.00001610597,0.000018375062,0.00004343502,0.00011776824,0.001737592],"genre_scores_gemma":[0.8360949,0.00042143068,0.15820654,0.00022756474,0.00008089994,0.00019829496,0.00039304307,0.00023168485,0.0041457266],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918383,0.00032159133,0.00003202275,0.00015333013,0.00021536248,0.0000938494],"domain_scores_gemma":[0.9987061,0.00079890713,0.00014621246,0.00008283702,0.00020778365,0.000058204685],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018062424,0.0013618278,0.0014186612,0.00072373793,0.00033421486,0.0013518358,0.0010573011,0.0009912467,0.0024446284],"category_scores_gemma":[0.004368826,0.000802947,0.0009991374,0.00078092545,0.0009030423,0.0016350166,0.0012661845,0.0016163713,0.00036906535],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016582493,0.000009506718,0.00008469578,0.000015669295,0.000010304182,0.000016101943,0.000011614675,0.986791,0.00023043633,0.008019754,0.00039862865,0.004395649],"study_design_scores_gemma":[0.0000011209127,0.0000039360552,0.000009639892,0.0000012135107,7.107208e-7,0.0000018802857,0.0000012798135,0.9974808,0.00003611836,0.0024073077,0.000054723198,0.0000013085352],"about_ca_topic_score_codex":0.00641077,"about_ca_topic_score_gemma":0.0037077407,"teacher_disagreement_score":0.00641077,"about_ca_system_score_codex":0.0011545841,"about_ca_system_score_gemma":0.0014524243,"threshold_uncertainty_score":0.01274693},"labels":[],"label_agreement":null},{"id":"W4313590472","doi":"10.1186/s43067-022-00067-w","title":"Optimum generation scheduling incorporating wind energy using HHO–IGWO algorithm","year":2023,"lang":"en","type":"article","venue":"Journal of Electrical Systems and Information Technology","topic":"Electric Power System Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Mitacs; University of Calgary","keywords":"Renewable energy; Power system simulation; Wind power; Scheduling (production processes); Electric power system; Mathematical optimization; Engineering; Computer science; Economic dispatch; Reliability engineering; Operations research; Operations management; Power (physics); Electrical engineering; Mathematics","score_opus":0.008811439879338249,"score_gpt":0.20747438646893648,"score_spread":0.19866294658959824,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313590472","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13788286,0.00047857835,0.84807974,0.00027652964,0.000120499746,0.00013221666,0.00011069052,0.0004436391,0.012475186],"genre_scores_gemma":[0.8676273,0.00012310916,0.12877128,0.000076196324,0.000031210904,0.00009940234,0.00011276336,0.00003671351,0.0031220342],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99983,0.000057658803,0.0000063061448,0.00003549987,0.00003377138,0.000036800033],"domain_scores_gemma":[0.9998154,0.00008505397,0.000029952605,0.000014340353,0.000035966892,0.000019372434],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035852124,0.00049157074,0.0008120891,0.0004170384,0.00024923513,0.00056019286,0.0006703364,0.0005730953,0.0022064112],"category_scores_gemma":[0.0006917746,0.00028976912,0.00037025704,0.00043054827,0.00033425787,0.00044359124,0.00039280285,0.00035977794,0.00021416835],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007160909,0.000036822374,0.00033170855,0.000023709057,0.000019815006,0.00003164416,0.000014280246,0.97567046,0.0006753673,0.0015477434,0.0004291891,0.02114756],"study_design_scores_gemma":[0.000012717017,0.000017795868,0.00005383191,0.000001599128,0.0000022128534,0.0000033707252,0.0000035744258,0.9993481,0.000083987085,0.00038251787,0.0000891471,0.0000011871002],"about_ca_topic_score_codex":0.0061336895,"about_ca_topic_score_gemma":0.0062703537,"teacher_disagreement_score":0.0061336895,"about_ca_system_score_codex":0.00045171802,"about_ca_system_score_gemma":0.000897504,"threshold_uncertainty_score":0.012195945},"labels":[],"label_agreement":null},{"id":"W4313812644","doi":"10.1007/s11149-022-09456-5","title":"Employing gain-sharing regulation to promote forward contracting in the electricity sector","year":2023,"lang":"en","type":"article","venue":"Journal of Regulatory Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund","keywords":"Procurement; Public finance; Electricity; Industrial organization; Business; Economics; Microeconomics; Cost sharing; Public economics; Marketing; Macroeconomics","score_opus":0.01549089503280215,"score_gpt":0.22080378339418918,"score_spread":0.20531288836138703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313812644","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31851363,0.0008042154,0.5557203,0.008505021,0.0005909502,0.00049784116,0.000116192656,0.0007354255,0.11451637],"genre_scores_gemma":[0.9877983,0.00009287189,0.008782014,0.0003604164,0.000077359226,0.000037072325,0.000008566279,0.000018004757,0.0028253482],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9934942,0.0033836379,0.00024957006,0.00070394034,0.0013584719,0.0008102196],"domain_scores_gemma":[0.9792234,0.015041678,0.0016477081,0.0019796826,0.0015877173,0.00051987485],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013745095,0.00067683065,0.0010276722,0.0008183647,0.0013656307,0.002693599,0.0019666145,0.0038105876,0.0062116566],"category_scores_gemma":[0.034342967,0.00047838435,0.0010674497,0.00060206343,0.0031186873,0.003657434,0.0032652232,0.0033604696,0.000536235],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004727278,0.000670855,0.0018420279,0.00021459376,0.00011727902,0.0004288191,0.0005460279,0.13153785,0.009515532,0.79959214,0.004643415,0.05041877],"study_design_scores_gemma":[0.000342842,0.00046616636,0.0012813677,0.00009289937,0.0000908025,0.00018205681,0.000300936,0.30072236,0.0054378207,0.6855945,0.0054104584,0.000077701356],"about_ca_topic_score_codex":0.0019478468,"about_ca_topic_score_gemma":0.0026875022,"teacher_disagreement_score":0.013745095,"about_ca_system_score_codex":0.0016269479,"about_ca_system_score_gemma":0.004897101,"threshold_uncertainty_score":0.07269192},"labels":[],"label_agreement":null},{"id":"W4317627131","doi":"10.1016/j.eneco.2023.106521","title":"Foreseeing the worst: Forecasting electricity DART spikes","year":2023,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; Group for Research in Decision Analysis; HEC Montréal","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs; HEC Montréal; Hydro-Québec","keywords":"Dart; Computer science; Spike (software development); Set (abstract data type); Predictive power; Electricity; Feature (linguistics); Operator (biology); Probabilistic forecasting; Econometrics; Machine learning; Artificial intelligence; Economics; Engineering","score_opus":0.01344774014926228,"score_gpt":0.16679983841174795,"score_spread":0.15335209826248566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317627131","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9809786,0.0004080489,0.009368818,0.0020869868,0.00018586978,0.000023015013,0.0010795833,0.0002122062,0.0056569353],"genre_scores_gemma":[0.99849296,0.00007962971,0.00076148205,0.00004182818,0.000037096434,0.0000031584727,0.0003013307,0.000011273201,0.0002711008],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998161,0.000040451614,0.000011855881,0.000049784383,0.00004447747,0.000037407954],"domain_scores_gemma":[0.9989172,0.000576329,0.000159932,0.000057942263,0.00014715597,0.00014143821],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009184058,0.00050112506,0.00050612335,0.0006141997,0.00031255503,0.0015424475,0.00043290854,0.0012565965,0.00079540885],"category_scores_gemma":[0.0050666835,0.00023235496,0.000303252,0.0008049725,0.00030181272,0.0014618225,0.000477668,0.0013762978,0.00018825028],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00063021085,0.0001898979,0.10988711,0.000055245888,0.00015373886,0.0005873096,0.00009946414,0.8456675,0.0017857095,0.0061149504,0.0089920135,0.02583685],"study_design_scores_gemma":[0.000012611002,0.000039017632,0.013857771,0.0000074512845,0.000011884724,0.00003272221,0.00012346632,0.9805658,0.0005107507,0.0040232665,0.0008030877,0.000012133654],"about_ca_topic_score_codex":0.011320775,"about_ca_topic_score_gemma":0.011624866,"teacher_disagreement_score":0.011320775,"about_ca_system_score_codex":0.00072693557,"about_ca_system_score_gemma":0.00044078543,"threshold_uncertainty_score":0.022509754},"labels":[],"label_agreement":null},{"id":"W4321021077","doi":"10.1109/tempr.2023.3244337","title":"Market Power Mitigation in Transmission Expansion Planning Problems","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Markets Policy and Regulation","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Junta de Andalucía","keywords":"Mathematical optimization; Electricity market; Market power; Linear programming; Plan (archaeology); Computer science; Transmission (telecommunications); Economics; Electricity; Microeconomics; Mathematics; Engineering; Telecommunications","score_opus":0.007354551351389541,"score_gpt":0.21612153823028452,"score_spread":0.20876698687889497,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4321021077","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034738332,0.0003378598,0.9601844,0.00030434146,0.000022800981,0.0000966234,0.00003276597,0.00012658643,0.004156232],"genre_scores_gemma":[0.7770364,0.00054918847,0.21818362,0.00010761332,0.00006508214,0.0003525814,0.000103080274,0.000078467514,0.0035239183],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928963,0.0004565507,0.00001624644,0.00007407387,0.00008984385,0.00007370104],"domain_scores_gemma":[0.9977709,0.0018808463,0.00012799454,0.000037303886,0.00013776709,0.000045236644],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019425441,0.0009003364,0.0011298998,0.000571164,0.00050732336,0.00090148585,0.0007053686,0.00091904745,0.0015080781],"category_scores_gemma":[0.004401791,0.00047208497,0.00045462154,0.00069502776,0.00094239594,0.00086140615,0.00076519785,0.0011578801,0.0001372821],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021118429,0.000017632508,0.00022544312,0.00003210569,0.000010995558,0.000043765453,0.000024324647,0.9803751,0.0001961815,0.007914696,0.00024676515,0.010891851],"study_design_scores_gemma":[0.0000060238417,0.000011145106,0.000026167623,0.0000030451192,0.0000021403746,0.0000057218963,0.0000051361963,0.9966455,0.00011701418,0.0030718958,0.000104760875,0.0000013181424],"about_ca_topic_score_codex":0.0055291965,"about_ca_topic_score_gemma":0.0045484407,"teacher_disagreement_score":0.0055291965,"about_ca_system_score_codex":0.00078218,"about_ca_system_score_gemma":0.0016353303,"threshold_uncertainty_score":0.010994017},"labels":[],"label_agreement":null},{"id":"W4322576739","doi":"10.1109/oajpe.2023.3247989","title":"Learning-Assisted Variables Reduction Method for Large-Scale MILP Unit Commitment","year":2023,"lang":"en","type":"article","venue":"IEEE Open Access Journal of Power and Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Schedule; Reduction (mathematics); Mathematical optimization; Integer programming; Computer science; Linear programming; Yield (engineering); Power system simulation; Integer (computer science); Range (aeronautics); Mathematics; Electric power system; Engineering; Power (physics)","score_opus":0.0327592495225813,"score_gpt":0.3363071410573977,"score_spread":0.30354789153481637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4322576739","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028031957,0.00008098341,0.99519217,0.00006941002,0.000027385664,0.00004077348,0.00003432253,0.00056488864,0.0011869392],"genre_scores_gemma":[0.23694001,0.00018488549,0.75768113,0.00017668499,0.00008975813,0.00041537217,0.00047016956,0.00041764064,0.003624359],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945384,0.00018956189,0.000024680621,0.000076386044,0.0001983538,0.000057186393],"domain_scores_gemma":[0.9991103,0.00052140106,0.00008066163,0.00007346244,0.00017752811,0.000036627032],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009170662,0.001167841,0.0009724804,0.00067207863,0.00047897,0.00064931874,0.0010554248,0.0006598212,0.004577291],"category_scores_gemma":[0.0025238167,0.00047402282,0.0008220902,0.0007034457,0.00049940485,0.0007580261,0.0010340667,0.0023532584,0.0010726639],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052238414,0.00005123258,0.0002306358,0.00006241438,0.00002138657,0.00004180851,0.000034228615,0.88330966,0.0015337582,0.005556062,0.002482031,0.106624596],"study_design_scores_gemma":[0.0000051856973,0.00000910971,0.00002489548,0.000002770304,0.0000017834917,0.0000044864437,0.0000035212486,0.99776244,0.00029964786,0.001437783,0.00044646653,0.0000020049945],"about_ca_topic_score_codex":0.0043784436,"about_ca_topic_score_gemma":0.00524043,"teacher_disagreement_score":0.004577291,"about_ca_system_score_codex":0.0005926295,"about_ca_system_score_gemma":0.0015306175,"threshold_uncertainty_score":0.015312552},"labels":[],"label_agreement":null},{"id":"W4323265851","doi":"10.1049/stg2.12065","title":"Fuzzy optimisation model of an incremental capacity auction formulation with greenhouse gas consideration","year":2023,"lang":"en","type":"article","venue":"IET Smart Grid","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Greenhouse gas; Renewable energy; Electricity generation; Environmental science; Environmental economics; Computer science; Mathematical optimization; Economics; Power (physics); Engineering; Mathematics","score_opus":0.022644476723291344,"score_gpt":0.21234087155121326,"score_spread":0.18969639482792192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4323265851","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2821828,0.0010218282,0.65215683,0.0018410264,0.00014709365,0.00033524993,0.0013918666,0.00031235174,0.060610924],"genre_scores_gemma":[0.9605005,0.00017594844,0.029849585,0.000105013736,0.000022715016,0.00018575779,0.00022521563,0.000027818653,0.008907476],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973303,0.000101226426,0.000010316896,0.00005277177,0.000050204086,0.000052382326],"domain_scores_gemma":[0.99904853,0.0006737007,0.000070330716,0.000024158484,0.00013633889,0.000046834008],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001146866,0.0007894908,0.0008417712,0.00069787714,0.0004251281,0.0016919691,0.0011121077,0.0018065949,0.0056397766],"category_scores_gemma":[0.0020727946,0.0005105525,0.0010044776,0.00060534396,0.0008282744,0.0007120543,0.0005476562,0.0010750378,0.0002534034],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014665914,0.0000064252854,0.00007659068,0.00001027312,0.0000055542823,0.000023119239,0.0000067502037,0.9968706,0.00010358509,0.002068622,0.00011486564,0.00069899304],"study_design_scores_gemma":[0.0000054517577,0.000005931025,0.00004616667,0.0000023190064,0.000002415286,0.0000023089874,0.0000044047606,0.9991756,0.00003267734,0.0006398929,0.000080865466,0.0000020009852],"about_ca_topic_score_codex":0.04298588,"about_ca_topic_score_gemma":0.018429108,"teacher_disagreement_score":0.04298588,"about_ca_system_score_codex":0.0020004057,"about_ca_system_score_gemma":0.001556356,"threshold_uncertainty_score":0.08547133},"labels":[],"label_agreement":null},{"id":"W4363675548","doi":"10.3390/en16083335","title":"AI-Based Scheduling Models, Optimization, and Prediction for Hydropower Generation: Opportunities, Issues, and Future Directions","year":2023,"lang":"en","type":"article","venue":"Energies","topic":"Electric Power System Optimization","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; Royal Military College of Canada; Université du Québec à Chicoutimi","funders":"","keywords":"Hydropower; Scheduling (production processes); Renewable energy; Hydroelectricity; Computer science; Electricity generation; Artificial intelligence; Industrial engineering; Operations research; Mathematical optimization; Machine learning; Engineering; Power (physics); Operations management","score_opus":0.025892077739821412,"score_gpt":0.22875843985067928,"score_spread":0.20286636211085787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4363675548","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012387466,0.36471528,0.5508054,0.044683,0.0017580133,0.00008056539,0.000283598,0.0005131258,0.024773551],"genre_scores_gemma":[0.29216766,0.45865422,0.22826555,0.0030179122,0.0063478793,0.00021836626,0.0006330951,0.00018065257,0.010514482],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99954057,0.00020246765,0.00002604996,0.00006304244,0.0001360634,0.000031737058],"domain_scores_gemma":[0.9962606,0.002725321,0.00018114316,0.00014483812,0.0005470593,0.00014110163],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025352668,0.00074194657,0.001106272,0.00092783314,0.00035169013,0.002280594,0.0018552048,0.0013888393,0.0028345748],"category_scores_gemma":[0.0035164389,0.00034951806,0.00069757923,0.0022717847,0.0011558078,0.003705024,0.00094281905,0.0026568878,0.00089763146],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007234569,0.00028227433,0.002499459,0.0018688279,0.0001542416,0.00010621803,0.00016162942,0.31632417,0.00058708386,0.27339604,0.023467194,0.3810806],"study_design_scores_gemma":[0.0000093728795,0.00006306764,0.00051620585,0.00040032508,0.000024610506,0.00004142582,0.00018995113,0.7455846,0.0002542764,0.2111567,0.04172165,0.000037894082],"about_ca_topic_score_codex":0.0063716164,"about_ca_topic_score_gemma":0.0054931385,"teacher_disagreement_score":0.0063716164,"about_ca_system_score_codex":0.0012626948,"about_ca_system_score_gemma":0.0017032883,"threshold_uncertainty_score":0.013407946},"labels":[],"label_agreement":null},{"id":"W4365459721","doi":"10.1016/j.ijindorg.2023.102953","title":"Evaluating the impact of divestitures on competition: Evidence from Alberta’s wholesale electricity market","year":2023,"lang":"en","type":"article","venue":"International Journal of Industrial Organization","topic":"Electric Power System Optimization","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary; University of Alberta","funders":"","keywords":"Divestment; Restructuring; Market power; Competition (biology); Industrial organization; Electricity; Economics; Business; Asset (computer security); Electricity market; Empirical evidence; Monetary economics; Market economy; Finance; Monopoly","score_opus":0.05467947694162945,"score_gpt":0.3258646888005655,"score_spread":0.27118521185893607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4365459721","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97482985,0.00092054385,0.000118421136,0.0015669509,0.000023968872,0.000026108588,0.00029273448,0.00001047452,0.022210998],"genre_scores_gemma":[0.9963707,0.00043874516,0.000042153268,0.00028328164,0.000015990057,0.0000030212686,0.000371197,0.000003014827,0.0024718046],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99817896,0.000379152,0.000056520887,0.00013071616,0.00079589227,0.00045873853],"domain_scores_gemma":[0.97543585,0.013682958,0.0042258548,0.0009532077,0.0034520694,0.0022500178],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026937786,0.00040572186,0.00055988005,0.0011515855,0.0025048947,0.0042760274,0.0017911982,0.0021263943,0.006536818],"category_scores_gemma":[0.013116666,0.00028730047,0.00053998793,0.0022656831,0.0039968067,0.0021012563,0.0011197099,0.0027585523,0.0004695061],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0075846654,0.0033772902,0.86167943,0.00041307448,0.0010962046,0.002549576,0.0023220864,0.0190385,0.0017407024,0.032726042,0.021150392,0.04632197],"study_design_scores_gemma":[0.0012780532,0.001044573,0.9391436,0.00017563086,0.0008264781,0.00016987049,0.013295229,0.015013731,0.0014013702,0.0085232435,0.018977983,0.00015030571],"about_ca_topic_score_codex":0.7757359,"about_ca_topic_score_gemma":0.8859954,"teacher_disagreement_score":0.22426409,"about_ca_system_score_codex":0.00935373,"about_ca_system_score_gemma":0.009728029,"threshold_uncertainty_score":0.4511696},"labels":[],"label_agreement":null},{"id":"W4366085189","doi":"10.1016/j.renene.2023.04.052","title":"Evaluation of flexibility provided by cascading hydroelectric assets for variable renewable energy integration","year":2023,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Mitacs","keywords":"Flexibility (engineering); Renewable energy; Hydroelectricity; Environmental economics; Environmental resource management; Environmental science; Engineering; Business; Computer science; Economics; Electrical engineering","score_opus":0.019532308152459064,"score_gpt":0.2518749483247512,"score_spread":0.23234264017229214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366085189","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97425985,0.00017953692,0.018980026,0.000076449076,0.000021369704,0.00003259688,0.00010168816,0.000090150534,0.006258421],"genre_scores_gemma":[0.9987496,0.000016438249,0.00096226705,0.0000020225975,0.0000013442371,0.000004376004,0.000016271952,0.0000041982885,0.0002435188],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998016,0.00007412072,0.000008183407,0.000023863373,0.000049459075,0.00004279049],"domain_scores_gemma":[0.9991905,0.000534161,0.000052660762,0.00005011128,0.00010842488,0.000064165404],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073324156,0.0008218638,0.00050132524,0.00048001803,0.00026285084,0.00068232045,0.0004499661,0.0005372715,0.0022698876],"category_scores_gemma":[0.0017295502,0.00022625417,0.000492451,0.00048093978,0.00033177232,0.0006249823,0.00044994723,0.0004968184,0.00010593901],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029791534,0.00007020226,0.0017252915,0.00004336414,0.000035047826,0.00011082866,0.000013222553,0.98806584,0.002409544,0.000731748,0.00008532797,0.006411651],"study_design_scores_gemma":[0.000021017604,0.0003283852,0.0021008356,0.0000073761134,0.000045133358,0.000022631777,0.000038364724,0.9947126,0.002176077,0.00042508118,0.000115688905,0.0000068769205],"about_ca_topic_score_codex":0.003940444,"about_ca_topic_score_gemma":0.0043796143,"teacher_disagreement_score":0.003940444,"about_ca_system_score_codex":0.00053287955,"about_ca_system_score_gemma":0.00038705047,"threshold_uncertainty_score":0.007834971},"labels":[],"label_agreement":null},{"id":"W4366598528","doi":"10.1088/1742-6596/2474/1/012083","title":"Calculation of Emission Factors of the Northwest Regional Grid Based on Linear Support Vector Machines","year":2023,"lang":"en","type":"article","venue":"Journal of Physics Conference Series","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"123 Certification (Canada)","funders":"","keywords":"Support vector machine; Status quo; Grid; Power grid; Regression analysis; Linear regression; Computer science; Regression; Correlation coefficient; Data mining; Power (physics); Statistics; Mathematics; Machine learning","score_opus":0.019614852140539683,"score_gpt":0.23280216198255746,"score_spread":0.21318730984201778,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366598528","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61866534,0.0002073907,0.37658745,0.00013711976,0.00003841588,0.00005061601,0.00035349556,0.0010349854,0.0029252619],"genre_scores_gemma":[0.97920406,0.000050724324,0.019899182,0.000006692594,0.000004581073,0.000022974846,0.00020522458,0.000018932471,0.0005876277],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969125,0.0000740775,0.000023439858,0.00007062783,0.00010859546,0.000032030086],"domain_scores_gemma":[0.99964976,0.00015527324,0.00004137239,0.000019960069,0.00012444709,0.000009283463],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041705032,0.0005331531,0.00036420932,0.0008196282,0.00018322746,0.0004358906,0.00031041304,0.000266758,0.00081536407],"category_scores_gemma":[0.0015498985,0.00016658954,0.0005126648,0.0007869292,0.00013686645,0.0004773624,0.00019967639,0.00032024606,0.00014487632],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008797266,0.000056119803,0.016036,0.000071234615,0.000054347813,0.00009844214,0.00003316928,0.9001544,0.00405937,0.0009957378,0.0006148318,0.077738404],"study_design_scores_gemma":[0.0000024628016,0.0000097935235,0.0027865516,0.0000020342165,0.0000048739903,0.0000060465404,0.00000912372,0.9957105,0.0011393209,0.00022602959,0.000099952165,0.0000033587726],"about_ca_topic_score_codex":0.014131412,"about_ca_topic_score_gemma":0.007706568,"teacher_disagreement_score":0.014131412,"about_ca_system_score_codex":0.00043274512,"about_ca_system_score_gemma":0.00047841537,"threshold_uncertainty_score":0.028098345},"labels":[],"label_agreement":null},{"id":"W4376467336","doi":"10.4337/9781847204356.00019","title":"Index","year":2006,"lang":"en","type":"paratext","venue":"Edward Elgar Publishing eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Index (typography); Mathematics; Computer science; World Wide Web","score_opus":0.006712368829950057,"score_gpt":0.1949718477203177,"score_spread":0.18825947889036765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4376467336","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00040017258,0.0011873678,0.0012543197,0.0019019585,0.0043585156,0.00013155247,0.0037317798,0.0007626146,0.9862716],"genre_scores_gemma":[0.0021710482,0.0010381914,0.0007001289,0.0006441418,0.0005728259,0.00005641061,0.0025498765,0.00023978454,0.9920277],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99935764,0.00005955383,0.000044547218,0.0001344535,0.0003261319,0.00007761049],"domain_scores_gemma":[0.9987651,0.0001277179,0.00003840529,0.00018640941,0.000673524,0.00020876445],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00047841994,0.0010396374,0.0007888569,0.001917488,0.00190153,0.005553663,0.0014427623,0.0016622269,0.81492174],"category_scores_gemma":[0.0024812873,0.0003746981,0.00050808146,0.0025730012,0.00044818956,0.004106724,0.0024610162,0.0016559283,0.6905311],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002854709,0.000030728046,0.00021183051,0.00010281957,0.000002743911,0.000060670955,0.000055543907,0.00008211724,0.00017940433,0.010587674,0.8755787,0.11307927],"study_design_scores_gemma":[0.0000028828852,0.0000081429935,0.00015455509,0.000040774732,8.849093e-7,0.000047658676,0.0000500458,0.000037792226,0.000055138127,0.0014169383,0.9981828,0.0000023677628],"about_ca_topic_score_codex":0.003971493,"about_ca_topic_score_gemma":0.0046433024,"teacher_disagreement_score":0.18507826,"about_ca_system_score_codex":0.0017013346,"about_ca_system_score_gemma":0.0018609362,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4376468144","doi":"10.4337/9781847205513.00023","title":"Index","year":2007,"lang":"en","type":"paratext","venue":"Edward Elgar Publishing eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Index (typography); Computer science; World Wide Web","score_opus":0.009626945342920372,"score_gpt":0.21678760285666016,"score_spread":0.20716065751373977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4376468144","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00030182776,0.00065586733,0.0010215132,0.0019302252,0.0029310125,0.00011158685,0.005106483,0.00089663453,0.9870449],"genre_scores_gemma":[0.0012198667,0.00048938947,0.0005904298,0.0006577333,0.0004206989,0.00006211472,0.003179232,0.0002454753,0.9931351],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990759,0.000084685795,0.000053284948,0.00014675199,0.00052712933,0.000112269554],"domain_scores_gemma":[0.99828243,0.00018859471,0.000053634943,0.00028903034,0.00085558905,0.0003306498],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0006718981,0.0008473167,0.000726248,0.0020140123,0.0018194364,0.0073357187,0.00150579,0.0017161996,0.8268297],"category_scores_gemma":[0.0034365228,0.00038460802,0.0005393383,0.0030330368,0.0004273539,0.0042064623,0.0025048198,0.0016967214,0.7343428],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015458423,0.00003117498,0.0001248089,0.000048286503,0.0000016423837,0.000021776308,0.000029579505,0.000040199207,0.00009116084,0.007906131,0.90371937,0.08797033],"study_design_scores_gemma":[0.0000031780708,0.000005949934,0.00018715266,0.000028050135,7.3715375e-7,0.000017859773,0.000031989843,0.00003122848,0.00003685377,0.0012641512,0.99839044,0.0000024335022],"about_ca_topic_score_codex":0.0059315674,"about_ca_topic_score_gemma":0.0073600644,"teacher_disagreement_score":0.17317033,"about_ca_system_score_codex":0.001933833,"about_ca_system_score_gemma":0.002264655,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4376603244","doi":"10.32920/22817579.v1","title":"Learning-Assisted Variables Reduction Method for Large-Scale MILP Unit Commitment","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Schedule; Reduction (mathematics); Mathematical optimization; Integer programming; Power system simulation; Computer science; Yield (engineering); Linear programming; Integer (computer science); Range (aeronautics); Mathematics; Engineering; Electric power system; Power (physics)","score_opus":0.031014481760673097,"score_gpt":0.2861809424050283,"score_spread":0.25516646064435516,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4376603244","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025304526,0.00007221273,0.99546343,0.00006361554,0.000026087602,0.000034589808,0.000029330633,0.0005190129,0.0012612615],"genre_scores_gemma":[0.22059573,0.00019225608,0.77284724,0.00017926375,0.00008922697,0.0003808357,0.00046834908,0.00043517016,0.0048118713],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994711,0.00017798644,0.00002270981,0.00007807284,0.00019352869,0.000056553698],"domain_scores_gemma":[0.99920815,0.00044694182,0.0000742787,0.0000698385,0.00016570871,0.000035027897],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008130992,0.0010998861,0.0009479722,0.0006420289,0.0004554298,0.0006585402,0.0011394325,0.00064349023,0.0046728407],"category_scores_gemma":[0.00224298,0.0004848999,0.0007904698,0.00065996865,0.0005234104,0.0007476039,0.0010389156,0.0022264514,0.0011273383],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004895369,0.000050633036,0.00020927192,0.000052796953,0.000019470372,0.00004111321,0.000032534645,0.8794498,0.0017175032,0.0054755122,0.002489165,0.11041326],"study_design_scores_gemma":[0.000004363011,0.000007960815,0.000022675094,0.0000022612758,0.0000014795836,0.0000036398778,0.0000031539412,0.99793184,0.00030791035,0.001264108,0.00044863435,0.0000018907781],"about_ca_topic_score_codex":0.0047263433,"about_ca_topic_score_gemma":0.005272031,"teacher_disagreement_score":0.0047263433,"about_ca_system_score_codex":0.0006153478,"about_ca_system_score_gemma":0.001457344,"threshold_uncertainty_score":0.015632272},"labels":[],"label_agreement":null},{"id":"W4376603245","doi":"10.32920/22817579","title":"Learning-Assisted Variables Reduction Method for Large-Scale MILP Unit Commitment","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Schedule; Reduction (mathematics); Mathematical optimization; Integer programming; Yield (engineering); Computer science; Linear programming; Power system simulation; Integer (computer science); Range (aeronautics); Mathematics; Engineering; Electric power system; Power (physics)","score_opus":0.031014481760673097,"score_gpt":0.2861809424050283,"score_spread":0.25516646064435516,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4376603245","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025304526,0.00007221273,0.99546343,0.00006361554,0.000026087602,0.000034589808,0.000029330633,0.0005190129,0.0012612615],"genre_scores_gemma":[0.22059573,0.00019225608,0.77284724,0.00017926375,0.00008922697,0.0003808357,0.00046834908,0.00043517016,0.0048118713],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994711,0.00017798644,0.00002270981,0.00007807284,0.00019352869,0.000056553698],"domain_scores_gemma":[0.99920815,0.00044694182,0.0000742787,0.0000698385,0.00016570871,0.000035027897],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008130992,0.0010998861,0.0009479722,0.0006420289,0.0004554298,0.0006585402,0.0011394325,0.00064349023,0.0046728407],"category_scores_gemma":[0.00224298,0.0004848999,0.0007904698,0.00065996865,0.0005234104,0.0007476039,0.0010389156,0.0022264514,0.0011273383],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004895369,0.000050633036,0.00020927192,0.000052796953,0.000019470372,0.00004111321,0.000032534645,0.8794498,0.0017175032,0.0054755122,0.002489165,0.11041326],"study_design_scores_gemma":[0.000004363011,0.000007960815,0.000022675094,0.0000022612758,0.0000014795836,0.0000036398778,0.0000031539412,0.99793184,0.00030791035,0.001264108,0.00044863435,0.0000018907781],"about_ca_topic_score_codex":0.0047263433,"about_ca_topic_score_gemma":0.005272031,"teacher_disagreement_score":0.0047263433,"about_ca_system_score_codex":0.0006153478,"about_ca_system_score_gemma":0.001457344,"threshold_uncertainty_score":0.015632272},"labels":[],"label_agreement":null},{"id":"W4376868896","doi":"10.1016/j.eneco.2023.106721","title":"The value of electricity storage arbitrage on day-ahead markets across Europe","year":2023,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"Service Public de Wallonie; International Business Machines Corporation","keywords":"Arbitrage; Bidding; Value (mathematics); Futures contract; Electricity; Electricity market; Economics; Grid; Microeconomics; Business; Econometrics; Environmental economics; Computer science; Financial economics; Mathematics; Engineering; Electrical engineering","score_opus":0.005675840195738112,"score_gpt":0.19390869369525027,"score_spread":0.18823285349951216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4376868896","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98630863,0.0014521173,0.0025509635,0.0012191462,0.000056260793,0.00000720496,0.00034844768,0.000038098467,0.00801898],"genre_scores_gemma":[0.9991454,0.00012237791,0.00010846663,0.000023510744,0.000014265347,9.2030024e-7,0.00007246517,0.0000059617287,0.00050653174],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99944156,0.00021233328,0.000033808778,0.00011507954,0.00009337466,0.00010377838],"domain_scores_gemma":[0.99529195,0.0030659586,0.0006490284,0.00020851678,0.00048102436,0.00030356838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022202716,0.0002890454,0.0009426969,0.0007940987,0.0005283973,0.0035167267,0.0008526166,0.0017658604,0.0032002514],"category_scores_gemma":[0.009878381,0.0003177777,0.00057768857,0.0009979479,0.0010591253,0.004277642,0.0009998721,0.0013778028,0.00016155504],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0053274552,0.00041324584,0.09340943,0.00033035874,0.0010411768,0.002663343,0.00051386526,0.6139363,0.005074789,0.22617266,0.008772268,0.042345155],"study_design_scores_gemma":[0.00044461963,0.0006958597,0.12995233,0.0001645668,0.0005501788,0.0006936524,0.0016302527,0.6739763,0.0035771963,0.17894828,0.009153873,0.00021297825],"about_ca_topic_score_codex":0.00590179,"about_ca_topic_score_gemma":0.005359078,"teacher_disagreement_score":0.00590179,"about_ca_system_score_codex":0.0010513118,"about_ca_system_score_gemma":0.0006012543,"threshold_uncertainty_score":0.011742055},"labels":[],"label_agreement":null},{"id":"W4379742332","doi":"10.1016/j.enpol.2023.113647","title":"Market failure or politics? Understanding the motives behind regulatory actions to address surging electricity prices","year":2023,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Politics; Electricity; Electricity market; Economics; Market failure; Public economics; Industrial organization; Market economy; Microeconomics; Political science; Law; Engineering","score_opus":0.026623619119309067,"score_gpt":0.2581394586327687,"score_spread":0.23151583951345964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379742332","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30741298,0.0028935669,0.03328444,0.3385531,0.0008927552,0.00010620203,0.00015139345,0.000098691235,0.31660685],"genre_scores_gemma":[0.9903948,0.00044023182,0.000633692,0.0042445855,0.00019918015,0.0000252919,0.000007718546,0.00002310324,0.0040314007],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.996342,0.0015936757,0.000075483455,0.0003368683,0.0006028144,0.0010491466],"domain_scores_gemma":[0.9833118,0.010631941,0.0030265115,0.0004997894,0.001284275,0.0012457507],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009853521,0.00031902135,0.00055824075,0.00096510607,0.0016122506,0.007007083,0.00087904313,0.0054053897,0.007264896],"category_scores_gemma":[0.024766145,0.00027516417,0.00034758693,0.0007104696,0.008349767,0.0062321923,0.0015582036,0.005962256,0.0005367059],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007553413,0.000092321214,0.005747074,0.00007732294,0.00004394369,0.0001937903,0.0012527534,0.0036893566,0.0004780314,0.9686113,0.006544741,0.01319378],"study_design_scores_gemma":[0.000070414106,0.000066075554,0.010259213,0.0001558069,0.000031207714,0.000071029135,0.005826728,0.011762516,0.0006753172,0.9344525,0.03658275,0.000046408273],"about_ca_topic_score_codex":0.0024919393,"about_ca_topic_score_gemma":0.0039611543,"teacher_disagreement_score":0.009853521,"about_ca_system_score_codex":0.003021643,"about_ca_system_score_gemma":0.0048919497,"threshold_uncertainty_score":0.05211103},"labels":[],"label_agreement":null},{"id":"W4382201310","doi":"10.2139/ssrn.4492039","title":"Do Electricity Markets Promote Decarbonization? Evidence From State Level Data in the United States","year":2023,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Quest University Canada","funders":"","keywords":"Electricity; State (computer science); Business; Natural resource economics; Economics; Engineering; Computer science; Electrical engineering","score_opus":0.032410237280598095,"score_gpt":0.26550718908301635,"score_spread":0.23309695180241824,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382201310","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9444439,0.012867073,0.00063469383,0.016876945,0.00033055918,0.000029666278,0.0061208713,0.000037501013,0.01865881],"genre_scores_gemma":[0.994361,0.0027026746,0.00006664144,0.0009419462,0.00010618381,0.0000047243484,0.0012059233,0.000005310142,0.0006055973],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9988777,0.0003765251,0.00009827773,0.00018750722,0.000259507,0.00020060435],"domain_scores_gemma":[0.9664323,0.01675912,0.01261192,0.0012790106,0.0018375479,0.0010801187],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025758923,0.00024919023,0.0004705951,0.0008693811,0.00035299026,0.0018574081,0.00062129396,0.00105609,0.005187271],"category_scores_gemma":[0.015404808,0.00021990368,0.00074340205,0.0021177258,0.00097413803,0.0013308731,0.0010202695,0.0012510688,0.00028390446],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020818617,0.00038503666,0.94641733,0.00048250495,0.002186048,0.00036051983,0.0002345765,0.0035272837,0.00032874857,0.0073685963,0.01097288,0.025654506],"study_design_scores_gemma":[0.00018986434,0.00025673263,0.981752,0.00020824198,0.0011866018,0.00007436606,0.0008686876,0.0014838905,0.0006731099,0.003588769,0.009693545,0.000024116038],"about_ca_topic_score_codex":0.023931574,"about_ca_topic_score_gemma":0.03778664,"teacher_disagreement_score":0.023931574,"about_ca_system_score_codex":0.00061070145,"about_ca_system_score_gemma":0.0010022804,"threshold_uncertainty_score":0.047584534},"labels":[],"label_agreement":null},{"id":"W4382312876","doi":"10.1007/s10287-023-00455-1","title":"Flexible supply meets flexible demand: prosumer impact on strategic hydro operations","year":2023,"lang":"en","type":"article","venue":"Computational Management Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Division of Civil, Mechanical and Manufacturing Innovation; HEC Montréal; Energimyndigheten; Stockholms Universitet; National Science Foundation","keywords":"Arbitrage; Computer science; Cournot competition; Electricity; Flexibility (engineering); Environmental economics; Economics; Microeconomics; Finance; Electrical engineering","score_opus":0.01823420784807351,"score_gpt":0.27793774082819955,"score_spread":0.25970353298012605,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382312876","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9544407,0.00018340546,0.014289213,0.0012361283,0.00004937294,0.00003626353,0.00013862072,0.000066312336,0.029559944],"genre_scores_gemma":[0.99917054,0.000029297524,0.0003597377,0.000029877048,0.0000035014602,0.0000030147592,0.000007817826,0.000003337448,0.00039297628],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999458,0.00024094204,0.00001931081,0.00006334585,0.00007497496,0.00014344043],"domain_scores_gemma":[0.9962845,0.002265985,0.0005420794,0.00021190735,0.0003158883,0.00037958942],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014655321,0.00043159944,0.00037169483,0.00027176386,0.000541945,0.0020946853,0.00064845086,0.00091224426,0.0097888205],"category_scores_gemma":[0.006708123,0.0002655053,0.00037189687,0.00031871826,0.00091216515,0.002694952,0.0016081479,0.0010144188,0.00031037309],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014454433,0.0008727199,0.024346195,0.0002495677,0.00020149503,0.0018856468,0.00078089966,0.8099953,0.012537043,0.11379508,0.0030266487,0.030863956],"study_design_scores_gemma":[0.0001405159,0.0007760384,0.009843135,0.000046880792,0.00013336766,0.00020892227,0.002324774,0.9050138,0.0030391042,0.07617535,0.0022105041,0.00008762195],"about_ca_topic_score_codex":0.0045273337,"about_ca_topic_score_gemma":0.004718085,"teacher_disagreement_score":0.0097888205,"about_ca_system_score_codex":0.0010212059,"about_ca_system_score_gemma":0.0008199872,"threshold_uncertainty_score":0.03274685},"labels":[],"label_agreement":null},{"id":"W4382459518","doi":"10.1515/9780773552333-013","title":"Privatizing Electricity in British Columbia","year":2017,"lang":"en","type":"book-chapter","venue":"McGill-Queen's University Press eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Geography; Archaeology; History; Engineering; Electrical engineering","score_opus":0.008826481558913184,"score_gpt":0.17274944020632463,"score_spread":0.16392295864741144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382459518","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3280475,0.014513441,0.00064901577,0.031871527,0.0005104707,0.000051113686,0.001794711,0.00008269918,0.62247944],"genre_scores_gemma":[0.62805194,0.008202808,0.00034662758,0.0019643463,0.000050720475,0.000020045352,0.00046501379,0.00005053931,0.36084798],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994941,0.000034419852,0.000011304571,0.000039590486,0.0001559941,0.00026459954],"domain_scores_gemma":[0.9995914,0.00007383004,0.000024183972,0.000019181518,0.00014465093,0.00014668272],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025028386,0.00017270868,0.00028579927,0.0007185298,0.0035051354,0.003894327,0.0007488946,0.0011371451,0.01273817],"category_scores_gemma":[0.0011586342,0.00026464908,0.00019897016,0.0025386284,0.0012117346,0.0008120145,0.0009521369,0.0023973123,0.0005799587],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022883147,0.00016036772,0.041343093,0.00040654876,0.00008375749,0.0024431678,0.007504029,0.01905444,0.0026187627,0.3689992,0.32215744,0.23500036],"study_design_scores_gemma":[0.000032290187,0.00003586952,0.105579525,0.00053064345,0.000045634195,0.00023488422,0.013864415,0.0052603567,0.0007910697,0.016703686,0.85683846,0.00008313811],"about_ca_topic_score_codex":0.9872392,"about_ca_topic_score_gemma":0.9967982,"teacher_disagreement_score":0.05093394,"about_ca_system_score_codex":0.05093394,"about_ca_system_score_gemma":0.06338452,"threshold_uncertainty_score":0.36955333},"labels":[],"label_agreement":null},{"id":"W4382929299","doi":"10.1016/j.tej.2023.107288","title":"Impact of multiyear rate plans on power distributor productivity: Evidence from Alberta","year":2023,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Revenue; Economics; Incentive; Attrition; Empirical evidence; Industrial organization; Operations management; Natural resource economics; Microeconomics; Macroeconomics; Finance","score_opus":0.014617434082529647,"score_gpt":0.24963377420410104,"score_spread":0.2350163401215714,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382929299","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9859363,0.0008244607,0.00036937094,0.0013058785,0.000031215037,0.000022387687,0.0007886943,0.000033462384,0.010688242],"genre_scores_gemma":[0.99467623,0.00065436534,0.0001340082,0.00011418186,0.00001405835,0.0000053700646,0.0004974457,0.0000051791076,0.00389911],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99719524,0.0005397504,0.00008731215,0.00019886893,0.0012528334,0.0007260552],"domain_scores_gemma":[0.9809832,0.0071985116,0.0042684055,0.00074416783,0.0041095857,0.0026961425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002369858,0.00024818582,0.00029144535,0.0010602317,0.0009546221,0.0027560492,0.0014946922,0.00081372744,0.0029859333],"category_scores_gemma":[0.013107915,0.00026550988,0.00042192606,0.0020248573,0.0009766909,0.00080935203,0.0008940792,0.0010058461,0.00033749084],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018269259,0.0008719243,0.9124223,0.000107174244,0.00036927132,0.000489846,0.00084436085,0.021615265,0.0008003326,0.0026477466,0.0058136242,0.05219133],"study_design_scores_gemma":[0.00013592657,0.00046537517,0.98205835,0.00006519763,0.00018917411,0.000064945685,0.004168411,0.0053534457,0.000517765,0.00054849876,0.0063980515,0.000034886965],"about_ca_topic_score_codex":0.82590014,"about_ca_topic_score_gemma":0.92107856,"teacher_disagreement_score":0.17409986,"about_ca_system_score_codex":0.018580107,"about_ca_system_score_gemma":0.017488996,"threshold_uncertainty_score":0.3502503},"labels":[],"label_agreement":null},{"id":"W4382935376","doi":"10.1109/eem58374.2023.10161787","title":"Challenges and opportunities of flexibility markets related to operational planning","year":2023,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Flexibility (engineering); Risk analysis (engineering); Stakeholder; Industrial organization; Business; Electric power system; Grid; Electricity; Identification (biology); Key (lock); Environmental economics; Computer science; Computer security; Economics; Engineering; Power (physics)","score_opus":0.0748788374833109,"score_gpt":0.27403180646324954,"score_spread":0.19915296897993864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382935376","genre_codex":"empirical","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50652546,0.0044619488,0.12594473,0.05555182,0.00027564281,0.00019116678,0.00019014774,0.00009642948,0.30676258],"genre_scores_gemma":[0.99027795,0.0006867829,0.0074938955,0.0002651104,0.000038828053,0.00006256298,0.000021258229,0.000018689643,0.0011347821],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9883519,0.007200142,0.00041450316,0.0006200302,0.0023134656,0.0011000689],"domain_scores_gemma":[0.9839642,0.011132503,0.0016867595,0.00081583014,0.001603942,0.00079671794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014023234,0.00037186034,0.0004539856,0.0007894856,0.0021675157,0.008234719,0.0013251228,0.001677519,0.004502067],"category_scores_gemma":[0.020144163,0.000298088,0.0004966517,0.0015827527,0.0067470125,0.0075256955,0.0034439089,0.0033385775,0.00018892981],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008130294,0.0000652933,0.0034029467,0.00019168163,0.000028089695,0.00033068203,0.0043343506,0.056138396,0.00087278127,0.88691,0.0012893446,0.046355054],"study_design_scores_gemma":[0.000039062917,0.00016415484,0.006786263,0.0004929746,0.000038928814,0.0003873556,0.023327077,0.0625883,0.0013967847,0.8516763,0.05301587,0.000086938795],"about_ca_topic_score_codex":0.0038060122,"about_ca_topic_score_gemma":0.0050847894,"teacher_disagreement_score":0.014023234,"about_ca_system_score_codex":0.003849764,"about_ca_system_score_gemma":0.006186481,"threshold_uncertainty_score":0.07416284},"labels":[],"label_agreement":null},{"id":"W4384833588","doi":"10.1109/fes57669.2023.10183258","title":"Multi-objective generation and transmission expansion planning: An economic and technical viewpoint","year":2023,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Computer science; Transmission (telecommunications); Telecommunications","score_opus":0.021060661608962177,"score_gpt":0.2540373224304729,"score_spread":0.23297666082151072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4384833588","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01897659,0.0029390592,0.95917404,0.0013331239,0.000141516,0.000059396167,0.00008160573,0.000035250145,0.01725941],"genre_scores_gemma":[0.7941686,0.005582352,0.1890116,0.00026067707,0.00051171903,0.00019059979,0.00011723803,0.00009083798,0.010066472],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993248,0.0003489972,0.000019363666,0.0000678936,0.00018740124,0.00005149486],"domain_scores_gemma":[0.9994363,0.00037571078,0.000074660595,0.000023712035,0.00005995036,0.00002964403],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013708423,0.0011688381,0.00075468863,0.00083809,0.00041658324,0.0016333092,0.00094581686,0.001216209,0.0023206428],"category_scores_gemma":[0.001929326,0.00045712586,0.0006616864,0.0013590312,0.0007909136,0.0021020023,0.00075783435,0.0011802742,0.00020504698],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021396838,0.000040345752,0.00034902577,0.00014736768,0.000043913005,0.00017630824,0.00002056729,0.92540514,0.00078668044,0.053217337,0.0006904946,0.01910135],"study_design_scores_gemma":[0.0000051041557,0.00004695373,0.00026789313,0.000026451933,0.000014770647,0.00007195258,0.00003045101,0.97896314,0.00036713056,0.018474495,0.0017228277,0.000008949892],"about_ca_topic_score_codex":0.0013143077,"about_ca_topic_score_gemma":0.0017076585,"teacher_disagreement_score":0.0023206428,"about_ca_system_score_codex":0.00075529335,"about_ca_system_score_gemma":0.00083821063,"threshold_uncertainty_score":0.007763326},"labels":[],"label_agreement":null},{"id":"W4385364445","doi":"10.59962/9780774867535-011","title":"Charlie Wing and the Alberta Liquor Control Board","year":2022,"lang":"en","type":"book-chapter","venue":"University of British Columbia Press eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wing; Aeronautics; Engineering; Aerospace engineering","score_opus":0.004702056673324751,"score_gpt":0.13511202800048155,"score_spread":0.13040997132715682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385364445","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014276381,0.025717732,0.0024143353,0.037209924,0.008139407,0.00004461801,0.0003962208,0.00034516735,0.92430496],"genre_scores_gemma":[0.002694328,0.0024574788,0.00024236836,0.00089960126,0.00015106711,0.00000478204,0.00006324818,0.00003568268,0.99345124],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991605,0.00006415394,0.00001473066,0.00009521343,0.0005219925,0.00014344121],"domain_scores_gemma":[0.99921644,0.00007798427,0.0000189239,0.000038579026,0.0005117917,0.00013618478],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009851204,0.00087700604,0.00041207983,0.0010058092,0.0027779366,0.004993321,0.00082069193,0.0019785669,0.07907221],"category_scores_gemma":[0.0015189773,0.00052188797,0.00019860017,0.0015947577,0.0011679182,0.0021164273,0.0008037393,0.002890085,0.021324927],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024385175,0.000012900391,0.00010234,0.000014935743,0.000001528424,0.00002421676,0.00007366333,0.0002924543,0.00008737482,0.013827712,0.9308333,0.054705232],"study_design_scores_gemma":[0.000002822418,0.0000030705505,0.00021270319,0.000024311317,0.0000010410798,0.000007190943,0.00009240273,0.00015282612,0.000045343048,0.0011704691,0.99828243,0.0000055585424],"about_ca_topic_score_codex":0.55280024,"about_ca_topic_score_gemma":0.72741735,"teacher_disagreement_score":0.44719976,"about_ca_system_score_codex":0.010239551,"about_ca_system_score_gemma":0.012792234,"threshold_uncertainty_score":0.89966685},"labels":[],"label_agreement":null},{"id":"W4385689550","doi":"10.1155/2023/9835024","title":"Retracted: An Algorithm for Optimal Allocation of Water Resources in Receiving Areas Based on Adaptive Decreasing Inertia Weights","year":2023,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":true,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Inertia; Computer science; Optimal allocation; Mathematical optimization; Algorithm; Operations research; Engineering; Mathematics","score_opus":0.007941152942972887,"score_gpt":0.22502894115960856,"score_spread":0.21708778821663566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385689550","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016124576,0.00019104118,0.98047054,0.0001527614,0.00020825717,0.00012539008,0.0000681511,0.0010147326,0.0016445976],"genre_scores_gemma":[0.25604165,0.00013112083,0.73701,0.00031739342,0.00012880123,0.00043590643,0.00027253403,0.00034564096,0.0053169923],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995598,0.00011672046,0.00003089156,0.000103713384,0.000108780805,0.00008013654],"domain_scores_gemma":[0.99915874,0.00034471575,0.00006977546,0.00008842351,0.00025744134,0.00008096736],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013028224,0.0013042942,0.0017430427,0.00095176586,0.0006848962,0.0012246327,0.0033986226,0.0021778708,0.0060796426],"category_scores_gemma":[0.0034396516,0.000903183,0.0009188588,0.0009388201,0.0008105448,0.0014350183,0.0020924371,0.0014086853,0.0010017591],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038168838,0.00012111704,0.00062399515,0.00012036008,0.000081112135,0.00014651669,0.00013825591,0.77396435,0.0024161874,0.0034363258,0.0043074144,0.21426277],"study_design_scores_gemma":[0.000059926708,0.000049584705,0.00007571964,0.000008028227,0.000010145708,0.000015745421,0.000010378187,0.99774337,0.00038925555,0.0010072842,0.00062424695,0.000006350887],"about_ca_topic_score_codex":0.010714789,"about_ca_topic_score_gemma":0.010521026,"teacher_disagreement_score":0.010714789,"about_ca_system_score_codex":0.00094452867,"about_ca_system_score_gemma":0.0023000936,"threshold_uncertainty_score":0.021304846},"labels":[],"label_agreement":null},{"id":"W4385722739","doi":"10.59962/9780774824187-006","title":"1 The Nexus of Hydroelectricity in Quebec","year":2013,"lang":"en","type":"book-chapter","venue":"University of British Columbia Press eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Nexus (standard); Hydroelectricity; Political science; Engineering; Electrical engineering","score_opus":0.005632196483713418,"score_gpt":0.13944588920628953,"score_spread":0.13381369272257612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385722739","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004345085,0.060502063,0.0011511786,0.011868338,0.0013668336,0.000042199055,0.0010116856,0.000102294,0.9196103],"genre_scores_gemma":[0.07683743,0.037871018,0.0014497709,0.001936538,0.00024852637,0.000030692292,0.00042873315,0.00009513629,0.88110226],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997502,0.000033790588,0.0000066359676,0.00003209772,0.00010374154,0.000073589945],"domain_scores_gemma":[0.9998455,0.00002462102,0.000007657914,0.000008633762,0.00008857091,0.000025082692],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018063979,0.0004970391,0.00027818023,0.0014024602,0.0033201678,0.0035104372,0.000619466,0.0010808567,0.05404865],"category_scores_gemma":[0.0005920576,0.00026548558,0.0002457108,0.0038545781,0.000996254,0.0012360222,0.00056757906,0.001435483,0.002959792],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003420585,0.00003596031,0.001831536,0.00027840206,0.000012777856,0.00029542527,0.0011742641,0.0026473103,0.0004088296,0.34072924,0.4258356,0.22671646],"study_design_scores_gemma":[0.0000024892802,0.0000041304293,0.0019190329,0.0002108935,0.0000029679488,0.00004169744,0.00029986617,0.00036490615,0.000073835625,0.0055829976,0.9914876,0.00000960972],"about_ca_topic_score_codex":0.9615914,"about_ca_topic_score_gemma":0.98646104,"teacher_disagreement_score":0.05404865,"about_ca_system_score_codex":0.026406106,"about_ca_system_score_gemma":0.026183762,"threshold_uncertainty_score":0.1915906},"labels":[],"label_agreement":null},{"id":"W4386091132","doi":"10.1016/j.eneco.2023.106945","title":"Pricing inconsistency between the futures and Financial Transmission Right markets in North America","year":2023,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; Group for Research in Decision Analysis; HEC Montréal","funders":"","keywords":"Futures contract; Economics; Financial economics; Econometrics; Financial market; Derivatives market; Sample (material); Finance","score_opus":0.003436611625445738,"score_gpt":0.1601080938993591,"score_spread":0.15667148227391337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386091132","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9838441,0.00045930987,0.0017214941,0.003490755,0.000026104919,0.000007848583,0.00013676433,0.000024115994,0.010289512],"genre_scores_gemma":[0.9989735,0.00010850331,0.00019339433,0.000089841815,0.000023580615,0.0000024333376,0.00006486441,0.000005657221,0.00053826906],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9992473,0.0003425855,0.000041022162,0.000129749,0.00012668643,0.00011262696],"domain_scores_gemma":[0.98934174,0.0075383633,0.0015980188,0.000335605,0.00076763844,0.00041856838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022734585,0.0001509842,0.0007221351,0.00082440197,0.000768406,0.003119255,0.00083057955,0.0010817065,0.0050683976],"category_scores_gemma":[0.018286042,0.00030908326,0.00036561422,0.0011073406,0.0014751604,0.0038161832,0.00068329234,0.0018251123,0.00011340976],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0033503177,0.0009223633,0.21459436,0.00026577886,0.00064686744,0.0028546832,0.0041259415,0.10831674,0.0024725022,0.55541086,0.022882292,0.08415726],"study_design_scores_gemma":[0.00047314435,0.00021664318,0.36073238,0.00008855942,0.00032951764,0.000590281,0.007497409,0.21755694,0.0008012069,0.4034439,0.008082761,0.00018722692],"about_ca_topic_score_codex":0.061752282,"about_ca_topic_score_gemma":0.047813963,"teacher_disagreement_score":0.061752282,"about_ca_system_score_codex":0.0023726095,"about_ca_system_score_gemma":0.0009144285,"threshold_uncertainty_score":0.12278569},"labels":[],"label_agreement":null},{"id":"W4386590664","doi":"10.1109/tpwrs.2023.3314372","title":"Incorporating System Frequency Dynamics Into Real-Time Locational Marginal Pricing of Electricity","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Electric power system; Electricity market; Automatic frequency control; Electricity; System dynamics; Economic dispatch; Offset (computer science); Marginal cost; Lagrange multiplier; Electric power transmission; Electricity pricing; Upgrade; Wind power; Mathematical optimization; Control theory (sociology); Power (physics); Control (management); Economics; Engineering; Telecommunications; Microeconomics; Mathematics","score_opus":0.005361028158020068,"score_gpt":0.19783565564652614,"score_spread":0.19247462748850608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386590664","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012933816,0.00006900351,0.9833845,0.00014589998,0.000065293825,0.000018661345,0.00003694626,0.00008030398,0.0032657057],"genre_scores_gemma":[0.8812588,0.00022714316,0.11433946,0.00008541419,0.00010831193,0.00006145433,0.00005696403,0.000100698766,0.0037617364],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971133,0.00011602516,0.0000108052445,0.0000496113,0.000078821184,0.000033352273],"domain_scores_gemma":[0.9994549,0.0002890124,0.000078869074,0.00008708873,0.000061063874,0.000029044322],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064041954,0.0006700774,0.00047258026,0.00025839586,0.00024237008,0.0009400352,0.0010142076,0.00065436476,0.002719534],"category_scores_gemma":[0.0030429487,0.00045137305,0.00058508164,0.00034145828,0.0006933605,0.0017340578,0.0008829058,0.0011870876,0.00025809745],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010912398,0.000013361901,0.00026656655,0.000015989723,0.000012044345,0.000045625435,0.000019661244,0.96730566,0.0006524351,0.024074016,0.00028444492,0.0072993315],"study_design_scores_gemma":[0.000001822117,0.000007303372,0.00005049299,0.0000016934491,0.000002365718,0.00000914688,0.0000041699327,0.99393106,0.00010988767,0.00544517,0.00043425063,0.0000027496465],"about_ca_topic_score_codex":0.0037427507,"about_ca_topic_score_gemma":0.0042125485,"teacher_disagreement_score":0.0037427507,"about_ca_system_score_codex":0.0006763319,"about_ca_system_score_gemma":0.00094522495,"threshold_uncertainty_score":0.009097695},"labels":[],"label_agreement":null},{"id":"W4386802716","doi":"10.23977/jnca.2023.080101","title":"Research on Large-scale Multi-target Units Combination Model Based on IAFSA","year":2023,"lang":"en","type":"article","venue":"Journal of Network Computing and Applications","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Swarm behaviour; Weighting; Convergence (economics); Mathematical optimization; Computer science; Scale (ratio); Energy (signal processing); Algorithm; Rate of convergence; Mathematics; Key (lock); Statistics","score_opus":0.03902825999438042,"score_gpt":0.3138163660665046,"score_spread":0.27478810607212417,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386802716","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032446586,0.0005682482,0.9580553,0.00026507728,0.00007949937,0.000079378915,0.00007454897,0.00017712532,0.008254247],"genre_scores_gemma":[0.9213352,0.00068217044,0.06791702,0.00008715757,0.000059856095,0.00032668476,0.00019015445,0.00006809533,0.009333595],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996507,0.00008843702,0.000018345007,0.00009572103,0.00009942956,0.00004736221],"domain_scores_gemma":[0.9996455,0.00015534487,0.000051097755,0.000014975364,0.00010367144,0.000029413546],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007330564,0.0009861647,0.0011562604,0.00049665925,0.0005558372,0.0012844837,0.0016866464,0.0010408573,0.0030043914],"category_scores_gemma":[0.0009377412,0.00054359634,0.001271094,0.0007920178,0.00064375094,0.0015305986,0.00089926645,0.0011122137,0.00027351454],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010525179,0.000007664237,0.00024898397,0.000027467375,0.000020780913,0.000032964625,0.000015747379,0.99311584,0.0003345321,0.001983723,0.00019553881,0.004006253],"study_design_scores_gemma":[0.000002091542,0.000007464138,0.000042723343,0.0000014480659,0.0000036375186,0.0000041920875,0.0000039969077,0.99926907,0.000038051945,0.00050940213,0.000116118696,0.0000017272832],"about_ca_topic_score_codex":0.017660389,"about_ca_topic_score_gemma":0.00836705,"teacher_disagreement_score":0.017660389,"about_ca_system_score_codex":0.0009042236,"about_ca_system_score_gemma":0.001281687,"threshold_uncertainty_score":0.035115182},"labels":[],"label_agreement":null},{"id":"W4386870766","doi":"10.3982/ecta20769","title":"The Investment Effects of Market Integration: Evidence From Renewable Energy Expansion in Chile","year":2023,"lang":"en","type":"article","venue":"Econometrica","topic":"Electric Power System Optimization","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Bureau of Economic Research; University of British Columbia; Rice University; Research Institute of Economy, Trade and Industry; University of California Berkeley; Horizon 2020 Framework Programme; Massachusetts Institute of Technology; European Commission; London School of Economics and Political Science; European Research Council; National Science Foundation","keywords":"Renewable energy; Allocative efficiency; Market integration; Economics; Investment (military); Electricity market; Market power; Electricity; Natural resource economics; Industrial organization; Microeconomics; Monopoly","score_opus":0.008476462423575783,"score_gpt":0.19073798133902037,"score_spread":0.1822615189154446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386870766","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9889098,0.0007644744,0.0003216684,0.0009840735,0.000005800161,0.000013559546,0.0003228969,0.000011409922,0.008666356],"genre_scores_gemma":[0.997724,0.00069852144,0.000094116025,0.00007387386,0.000016042435,0.00000953428,0.00038655914,0.0000033699198,0.0009940179],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9996438,0.000112106914,0.000020988547,0.00005076926,0.00006824425,0.00010408259],"domain_scores_gemma":[0.9957904,0.001538382,0.0018865438,0.00021575406,0.0003013379,0.00026764534],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009611841,0.000211788,0.0004293822,0.00062962953,0.0004038831,0.0012691861,0.0005106688,0.00043950786,0.004005976],"category_scores_gemma":[0.0038324487,0.00021209235,0.00046377763,0.0014544235,0.0009425037,0.0012380123,0.0014458604,0.0010780538,0.00032422962],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011407675,0.0016252472,0.8479641,0.00081462244,0.000754525,0.0028208955,0.002710832,0.04187099,0.002909103,0.031528626,0.0077188783,0.058141496],"study_design_scores_gemma":[0.000373706,0.0003674017,0.943726,0.00019370388,0.00039766115,0.00019910753,0.0061007226,0.025766356,0.0017509343,0.008700738,0.012358995,0.00006471359],"about_ca_topic_score_codex":0.04509952,"about_ca_topic_score_gemma":0.043275792,"teacher_disagreement_score":0.04509952,"about_ca_system_score_codex":0.0017283437,"about_ca_system_score_gemma":0.0010125036,"threshold_uncertainty_score":0.089674056},"labels":[],"label_agreement":null},{"id":"W4387005646","doi":"10.1109/pesgm52003.2023.10252854","title":"MISO’s Regional Long Range Transmission Planning: A Proactive and Holistic Planning Approach","year":2023,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator","funders":"","keywords":"Futures contract; Renewable energy; Scenario planning; Electric power system; Time horizon; Grid; Portfolio; Environmental economics; Wind power; Energy planning; Electricity market; Scenario analysis; Retirement planning; Business; Computer science; Electricity; Engineering; Economics; Power (physics); Marketing; Finance","score_opus":0.05000044085961597,"score_gpt":0.26390172862275185,"score_spread":0.21390128776313588,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387005646","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02263985,0.006529382,0.5470871,0.031023193,0.0010037746,0.0007853189,0.0050756517,0.0024299724,0.38342574],"genre_scores_gemma":[0.3380573,0.009698516,0.6010523,0.0015567696,0.0002714737,0.0006430223,0.0032056223,0.00085344043,0.04466165],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985875,0.0006261405,0.00006628696,0.00012668718,0.00044296283,0.00015046516],"domain_scores_gemma":[0.998816,0.00022051127,0.00010736772,0.00010580842,0.0005090901,0.0002411053],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027455415,0.0011004143,0.00043012554,0.0024524014,0.0012381738,0.00538726,0.0019390658,0.0012374399,0.0067618075],"category_scores_gemma":[0.0026730022,0.0006935545,0.0010291943,0.0031004103,0.0009107119,0.0024229726,0.0027655421,0.0016787705,0.0010002608],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052592677,0.00007708588,0.0031943838,0.00043995262,0.00020377435,0.000775859,0.0009151892,0.42542347,0.0021980554,0.27626804,0.083545804,0.20690584],"study_design_scores_gemma":[0.00003145135,0.00008510657,0.0028529668,0.00052464084,0.00012285983,0.00041842097,0.0029638642,0.22995445,0.0018382451,0.14527299,0.6158182,0.00011688938],"about_ca_topic_score_codex":0.040255375,"about_ca_topic_score_gemma":0.06631888,"teacher_disagreement_score":0.040255375,"about_ca_system_score_codex":0.0057214946,"about_ca_system_score_gemma":0.012265381,"threshold_uncertainty_score":0.080042124},"labels":[],"label_agreement":null},{"id":"W4387060054","doi":"10.1007/s12667-023-00623-x","title":"Quantifying the impact of scenario tree generation and reduction methods on the solution of the short-term hydroscheduling problem","year":2023,"lang":"en","type":"article","venue":"Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rio Tinto (Canada); Group for Research in Decision Analysis; Université du Québec à Chicoutimi","funders":"Mitacs","keywords":"Tree (set theory); Term (time); Variance reduction; Reduction (mathematics); Mathematical optimization; Stochastic programming; Hydropower; Stochastic optimization; Time horizon; Standard deviation; Computer science; Mathematics; Statistics; Engineering; Monte Carlo method","score_opus":0.05356126740358546,"score_gpt":0.30119194340186267,"score_spread":0.2476306759982772,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387060054","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6278473,0.0016675784,0.35208276,0.0013897428,0.00012736606,0.00016206614,0.00039747197,0.00043213222,0.015893487],"genre_scores_gemma":[0.92194694,0.00024308091,0.07665209,0.000091677466,0.00002168181,0.00004840208,0.00014711606,0.00005338384,0.0007957408],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99895775,0.0007628398,0.00002227692,0.00005120983,0.00012950682,0.00007637071],"domain_scores_gemma":[0.9918513,0.0071962676,0.00028045164,0.0002074714,0.00035881807,0.000105629326],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034788193,0.00054095435,0.0005381146,0.000567548,0.00030649282,0.0005846716,0.000522969,0.00084785454,0.0017497122],"category_scores_gemma":[0.012491541,0.00025520075,0.00041438246,0.0005693009,0.00039404465,0.0009814242,0.00062427716,0.00086732785,0.00010055403],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013212966,0.000053198026,0.000543927,0.000040190494,0.000022427203,0.000013555467,0.000015359257,0.9807842,0.00036393106,0.0029691248,0.0003010745,0.014760892],"study_design_scores_gemma":[0.000010082546,0.00006169756,0.00017365551,0.0000060275497,0.000007604647,0.0000048366946,0.000009761144,0.997924,0.00021232895,0.0014754666,0.000112343165,0.0000021888125],"about_ca_topic_score_codex":0.005355955,"about_ca_topic_score_gemma":0.005900898,"teacher_disagreement_score":0.005355955,"about_ca_system_score_codex":0.0006259206,"about_ca_system_score_gemma":0.0015127229,"threshold_uncertainty_score":0.018397987},"labels":[],"label_agreement":null},{"id":"W4387067355","doi":"10.2139/ssrn.4584199","title":"Multi-Objective Electricity Generation Expansion Planning Towards Renewable Energy Policy Objectives Under Uncertainties","year":2023,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Queen's University; Queen's University Belfast","keywords":"Renewable energy; Electricity; Electricity generation; Electricity system; Environmental economics; Natural resource economics; Business; Economics; Environmental science; Engineering; Power (physics); Physics; Electrical engineering","score_opus":0.024183034875682748,"score_gpt":0.26679649665238625,"score_spread":0.2426134617767035,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387067355","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1916119,0.0010818196,0.7788598,0.0011751355,0.000133202,0.00017159383,0.000447129,0.00025166798,0.026267784],"genre_scores_gemma":[0.948854,0.00033028724,0.046317715,0.00011106754,0.00006335913,0.00015617884,0.00016059967,0.0000730657,0.00393374],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995104,0.0002795531,0.000013270593,0.000057935766,0.00008033604,0.00005857187],"domain_scores_gemma":[0.9989712,0.0007590655,0.00010489884,0.000026556521,0.00009224375,0.00004599842],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018350466,0.0012189652,0.0011704821,0.00089441834,0.0002957247,0.001329175,0.0006592831,0.0011600809,0.0025797114],"category_scores_gemma":[0.003519657,0.00069254864,0.0007280674,0.000891384,0.00055150635,0.0011670886,0.0010205908,0.0011050344,0.00024434368],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012194401,0.0000055311734,0.000051574625,0.000011557447,0.000009739337,0.000014404806,0.0000036012977,0.99751943,0.00006436551,0.00085186766,0.000082300954,0.0013734628],"study_design_scores_gemma":[0.000003361582,0.000009322281,0.000042023523,0.000004409177,0.0000032906798,0.0000026963612,0.0000038574703,0.99835443,0.00005295175,0.0014623563,0.00005995849,0.0000013641121],"about_ca_topic_score_codex":0.0034988837,"about_ca_topic_score_gemma":0.002615079,"teacher_disagreement_score":0.0034988837,"about_ca_system_score_codex":0.00074130204,"about_ca_system_score_gemma":0.00089695386,"threshold_uncertainty_score":0.009704769},"labels":[],"label_agreement":null},{"id":"W4387071727","doi":"10.1016/j.jup.2023.101671","title":"Screening for collusion in wholesale electricity markets: A literature review","year":2023,"lang":"en","type":"review","venue":"Utilities Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Collusion; Transparency (behavior); Electricity; Industrial organization; Tacit collusion; Microeconomics; Business; Economics; Computer science; Computer security; Engineering","score_opus":0.038610317675735306,"score_gpt":0.329589560123791,"score_spread":0.2909792424480557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387071727","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003969468,0.99833554,0.00024606768,0.00039543564,0.00005701606,0.000019573887,0.000047846686,0.0000034825757,0.0004982255],"genre_scores_gemma":[0.005442928,0.9934256,0.00053482736,0.00030858128,0.00011875648,0.000019669644,0.00005085537,0.0000020468444,0.0000967932],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.99756646,0.0008376819,0.0005178848,0.00032892745,0.00064613175,0.00010297685],"domain_scores_gemma":[0.954305,0.0400394,0.0030894175,0.0003624636,0.001990743,0.00021295765],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0055341963,0.0012054208,0.003639623,0.0058882544,0.0003957962,0.0027406786,0.0017995602,0.0022820442,0.0070707686],"category_scores_gemma":[0.030717067,0.000811623,0.0025564302,0.007501526,0.0011253421,0.004004926,0.0010029819,0.0012521114,0.00057217997],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021197737,0.00014886803,0.003982952,0.16394372,0.0012495489,0.00036286103,0.00017265354,0.001277353,0.0001617583,0.006174117,0.012808248,0.8095059],"study_design_scores_gemma":[0.00033190104,0.00077866984,0.026802823,0.59769094,0.015930155,0.0040189414,0.001513776,0.004334,0.00095287774,0.027483474,0.31984675,0.00031562077],"about_ca_topic_score_codex":0.0044872854,"about_ca_topic_score_gemma":0.009307515,"teacher_disagreement_score":0.0070707686,"about_ca_system_score_codex":0.0013972797,"about_ca_system_score_gemma":0.005494619,"threshold_uncertainty_score":0.029268026},"labels":[],"label_agreement":null},{"id":"W4387099746","doi":"10.1080/15435075.2023.2262005","title":"Long-term optimal coordination of hydro-wind-thermal energy generation using stochastic dynamic programming","year":2023,"lang":"en","type":"article","venue":"International Journal of Green Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Renewable energy; Wind power; Mathematical optimization; Dynamic programming; Stochastic programming; Computer science; Term (time); Environmental science; Engineering; Mathematics; Electrical engineering","score_opus":0.012037663981925309,"score_gpt":0.2465405341958177,"score_spread":0.23450287021389238,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387099746","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19038275,0.00037312662,0.79682803,0.0005136483,0.00006568137,0.00015400253,0.00025721427,0.00022803008,0.011197568],"genre_scores_gemma":[0.9772906,0.00012169745,0.02005277,0.000027394295,0.000010817097,0.000102447186,0.00008603273,0.000025719788,0.0022824684],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996019,0.00015183291,0.000014317288,0.0000824697,0.00006093183,0.00008860694],"domain_scores_gemma":[0.99930084,0.0003838251,0.00012992928,0.000015584163,0.0001099861,0.000059845814],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001059211,0.00078386255,0.00095142453,0.00044001197,0.00046205206,0.0013252337,0.0005765634,0.0006760261,0.00182946],"category_scores_gemma":[0.0014846206,0.000692127,0.00074267975,0.0005910055,0.00061340054,0.00068309926,0.00071575167,0.0009132439,0.00013320569],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011702922,0.000006625856,0.0000871925,0.0000055703053,0.0000054075617,0.000009969655,0.0000031029774,0.9983877,0.00008627956,0.0006957662,0.000053191856,0.0006475943],"study_design_scores_gemma":[0.0000022269764,0.0000055283076,0.000030758503,6.88826e-7,0.0000016144468,8.137513e-7,0.0000024159058,0.9995988,0.000036445483,0.0002945373,0.000025072153,0.0000010399584],"about_ca_topic_score_codex":0.020815445,"about_ca_topic_score_gemma":0.020164011,"teacher_disagreement_score":0.020815445,"about_ca_system_score_codex":0.0017263719,"about_ca_system_score_gemma":0.0024110004,"threshold_uncertainty_score":0.04138857},"labels":[],"label_agreement":null},{"id":"W4387490385","doi":"10.1109/access.2023.3323594","title":"Machine Learning-Additional Decision Constraints for Improved MILP Day-Ahead Unit Commitment Method","year":2023,"lang":"en","type":"article","venue":"IEEE Access","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Power system simulation; Unit (ring theory); Artificial intelligence; Mathematical optimization; Machine learning; Operations research; Mathematics; Electric power system","score_opus":0.0335011058700486,"score_gpt":0.32260246790492514,"score_spread":0.2891013620348765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387490385","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009261284,0.00022573638,0.9831345,0.00018320623,0.000060002498,0.00007618476,0.00010646084,0.0005301005,0.0064226245],"genre_scores_gemma":[0.64708084,0.00025111588,0.3443105,0.00024176216,0.00009342129,0.0004537509,0.00046593233,0.00019051273,0.006912088],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938285,0.00023719507,0.000028899334,0.00008688784,0.00019925978,0.00006473641],"domain_scores_gemma":[0.99915624,0.00046201653,0.00007626367,0.000064332315,0.0002118314,0.000029446122],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009836339,0.0010058935,0.0009542575,0.00042397022,0.00034955473,0.0007779136,0.0011984217,0.0007241143,0.005522879],"category_scores_gemma":[0.0019324116,0.0005032593,0.0005643548,0.00057274714,0.00033279712,0.0007830592,0.0007687873,0.0021537943,0.0008431214],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022119479,0.000019158866,0.00009357107,0.000026100774,0.000009547699,0.000030246718,0.000011117292,0.9762441,0.00033675676,0.0024024188,0.00070719817,0.020097628],"study_design_scores_gemma":[0.0000019003494,0.000004694743,0.0000119776705,0.0000019551649,8.531787e-7,0.0000023340303,7.072478e-7,0.9993753,0.00008344001,0.0003261728,0.00018972241,9.898527e-7],"about_ca_topic_score_codex":0.0051517524,"about_ca_topic_score_gemma":0.005570522,"teacher_disagreement_score":0.005522879,"about_ca_system_score_codex":0.00060290954,"about_ca_system_score_gemma":0.0012653628,"threshold_uncertainty_score":0.01847589},"labels":[],"label_agreement":null},{"id":"W4387938908","doi":"10.1111/joie.12352","title":"Market Structure, Risk Preferences, and Forward Contracting Incentives*","year":2023,"lang":"en","type":"article","venue":"Journal of Industrial Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund; Government of Canada","keywords":"Forward contract; Incentive; Risk aversion (psychology); Microeconomics; Variance (accounting); Profit (economics); Economics; Electricity; Electricity market; Forward market; Business; Expected utility hypothesis; Financial economics","score_opus":0.016271609517281446,"score_gpt":0.20233095839106777,"score_spread":0.18605934887378633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387938908","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9808344,0.00016145226,0.007052107,0.000339104,0.0000041471035,0.000022882186,0.000051115258,0.0000067217525,0.01152814],"genre_scores_gemma":[0.9986473,0.000042875443,0.0007442581,0.000016804537,0.0000042810047,0.000005324916,0.0000129703785,0.0000010028808,0.0005251856],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995666,0.00021213536,0.000019176507,0.000036666515,0.000094918425,0.00007039243],"domain_scores_gemma":[0.98931,0.0068525006,0.0026234698,0.0003090454,0.00040682917,0.0004981168],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021853892,0.00021639794,0.00021790646,0.0003108167,0.0002418306,0.0009806546,0.00020351872,0.000555968,0.0059682415],"category_scores_gemma":[0.009207429,0.00014320319,0.00016663228,0.00022899304,0.0005233505,0.0012372071,0.00035414367,0.0005743579,0.00028589438],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0023090073,0.0022501403,0.38297215,0.00032847133,0.0003446545,0.0009642821,0.0015338158,0.10883217,0.030866034,0.35087168,0.0013658847,0.11736176],"study_design_scores_gemma":[0.00073495513,0.0020537705,0.41706008,0.00014198598,0.00017925685,0.0010262665,0.002404914,0.18262498,0.009927546,0.3771014,0.006609319,0.00013550684],"about_ca_topic_score_codex":0.00051249133,"about_ca_topic_score_gemma":0.0010469342,"teacher_disagreement_score":0.0059682415,"about_ca_system_score_codex":0.00044777637,"about_ca_system_score_gemma":0.00040502805,"threshold_uncertainty_score":0.019965768},"labels":[],"label_agreement":null},{"id":"W4387986941","doi":"10.1109/tempr.2023.3327903","title":"Tight and Compact Data-Driven Linear Relaxations for Constraint Screening in Unit Commitment","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Markets Policy and Regulation","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Computer science; Constraint (computer-aided design); Set (abstract data type); Mathematical optimization; Mathematics; Programming language","score_opus":0.033512069781384615,"score_gpt":0.27139728734247487,"score_spread":0.23788521756109027,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387986941","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006346006,0.0003001434,0.9853774,0.00041567688,0.00007187563,0.000116232986,0.00025184095,0.0003888907,0.0067319493],"genre_scores_gemma":[0.30890134,0.0007752731,0.6787571,0.00066036143,0.00015740476,0.00089912926,0.0012073972,0.00069626875,0.007945723],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979069,0.0010522285,0.00008974127,0.00023608054,0.00043728956,0.00027776632],"domain_scores_gemma":[0.993884,0.004774268,0.00031100976,0.00042900234,0.00040926613,0.00019247014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004214513,0.0017857612,0.0017999876,0.001086909,0.0006904,0.0021520774,0.002114882,0.0017236221,0.010175986],"category_scores_gemma":[0.014695546,0.0015259912,0.0016436263,0.0019836023,0.001708757,0.0030394068,0.0036576756,0.0056007975,0.0015763224],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014886008,0.00007130332,0.00016832801,0.00013821099,0.000029019708,0.00008888444,0.00009451679,0.9191784,0.0006883273,0.049185712,0.0034192842,0.026789082],"study_design_scores_gemma":[0.000021304997,0.00002009176,0.0000250297,0.000023133107,0.0000041330345,0.000008726327,0.000019226036,0.97896147,0.00030071824,0.019658064,0.0009498925,0.00000808793],"about_ca_topic_score_codex":0.004810643,"about_ca_topic_score_gemma":0.00631783,"teacher_disagreement_score":0.010175986,"about_ca_system_score_codex":0.0015026632,"about_ca_system_score_gemma":0.0022854144,"threshold_uncertainty_score":0.034042},"labels":[],"label_agreement":null},{"id":"W4388172182","doi":"10.58702/teyd.1357334","title":"CONVERGENCE OF WHOLESALE ELECTRICITY PRICES ACROSS EUROPEAN MARKETS: ARE WE THERE YET?","year":2023,"lang":"en","type":"article","venue":"Toplum Ekonomi ve Yönetim Dergisi","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lethbridge College","funders":"","keywords":"Unit root; Electricity; Convergence (economics); Economics; Electricity market; Spot contract; Econometrics; Market integration; Law of one price; International economics; Price level; Financial economics; Microeconomics; Macroeconomics; Mid price","score_opus":0.012218480927987692,"score_gpt":0.22408060010734057,"score_spread":0.21186211917935288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388172182","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8586711,0.028926594,0.0540846,0.023547804,0.000499436,0.00005178209,0.0012766827,0.000240288,0.032701693],"genre_scores_gemma":[0.98517346,0.0059161717,0.005639256,0.0010419048,0.00025068547,0.00002125067,0.00085388083,0.00006760995,0.0010357293],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9977847,0.0007084436,0.00024965307,0.0005481515,0.00045904057,0.00025003857],"domain_scores_gemma":[0.98555,0.007516565,0.0024029412,0.0010918279,0.0029969984,0.0004416877],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007000109,0.00044779794,0.0013137825,0.0015181423,0.00044907673,0.003695954,0.001063906,0.0014757273,0.0061213975],"category_scores_gemma":[0.029446064,0.00025144604,0.0009825082,0.0027867854,0.0014936514,0.010750638,0.0016276055,0.0021521552,0.00090197555],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00083432853,0.0003545536,0.35070837,0.0011357856,0.0008406108,0.0016714784,0.005873611,0.02768346,0.0017734013,0.1392118,0.011127206,0.45878538],"study_design_scores_gemma":[0.00008645225,0.0005032562,0.6943887,0.0026964156,0.00038500418,0.001029529,0.015162234,0.05475607,0.0031208235,0.17027058,0.057253513,0.00034737383],"about_ca_topic_score_codex":0.005612593,"about_ca_topic_score_gemma":0.0028874702,"teacher_disagreement_score":0.007000109,"about_ca_system_score_codex":0.00074252946,"about_ca_system_score_gemma":0.0012195116,"threshold_uncertainty_score":0.037020504},"labels":[],"label_agreement":null},{"id":"W4388281732","doi":"10.1109/cpese59653.2023.10303240","title":"Emission Mitigation Dispatch in Wind Power Generation with Expedited Machine Learning","year":2023,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Wind power; Computer science; Scheme (mathematics); Artificial neural network; Smart grid; Grid; Feed forward; Implementation; Feedforward neural network; Artificial intelligence; Embedded system; Control engineering; Engineering; Electrical engineering; Mathematics","score_opus":0.006088527454845526,"score_gpt":0.19364958334635893,"score_spread":0.1875610558915134,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388281732","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06978508,0.00031324246,0.92067575,0.00020986865,0.00006680673,0.000091323294,0.000056834564,0.00096354156,0.007837506],"genre_scores_gemma":[0.92370635,0.000079897116,0.07368752,0.00005856837,0.000023333154,0.00006570916,0.000061390485,0.000045117857,0.002272134],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979764,0.00007815325,0.000009068093,0.000032830823,0.000053748685,0.000028533681],"domain_scores_gemma":[0.9997415,0.00012999128,0.000036851314,0.000023081073,0.000054013835,0.0000146534085],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054535485,0.0006432039,0.00062801497,0.0002860596,0.00022317238,0.00047041976,0.0005698932,0.0004789725,0.001930939],"category_scores_gemma":[0.0009668938,0.00022716181,0.0002455916,0.00024092916,0.00028785653,0.00055508694,0.00052794797,0.0006199394,0.00027328308],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056980054,0.000034139113,0.0002609925,0.00003648967,0.000013066064,0.000032024975,0.0000102427,0.9638279,0.00095095095,0.0014027383,0.00024739208,0.033127118],"study_design_scores_gemma":[0.0000047376207,0.000022217015,0.00006757574,0.000001947056,0.0000017962475,0.000004211457,0.0000015781687,0.9989182,0.00036355655,0.00040026664,0.00021244383,0.0000014788047],"about_ca_topic_score_codex":0.0030911847,"about_ca_topic_score_gemma":0.003778058,"teacher_disagreement_score":0.0030911847,"about_ca_system_score_codex":0.00044292028,"about_ca_system_score_gemma":0.0006764647,"threshold_uncertainty_score":0.0064596534},"labels":[],"label_agreement":null},{"id":"W4388911810","doi":"10.1177/17835917231217125","title":"Strategic interaction between wholesale and ancillary service markets","year":2023,"lang":"en","type":"article","venue":"Competition and Regulation in Network Industries","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund; Canada Research Chairs","keywords":"Industrial organization; Business; Incentive; Market system; Marginal cost; Microeconomics; Economics","score_opus":0.025228560648719766,"score_gpt":0.22224344761843032,"score_spread":0.19701488696971056,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388911810","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6826928,0.0006890055,0.17535266,0.0032754706,0.00012893972,0.00028908573,0.00043721346,0.00021408878,0.13692075],"genre_scores_gemma":[0.99281234,0.00010131972,0.003128309,0.00012130384,0.000014385151,0.000025324158,0.000027340064,0.0000071711,0.00376241],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9979698,0.0008787239,0.00006477212,0.00026038647,0.0003469097,0.00047947516],"domain_scores_gemma":[0.9959526,0.0023514712,0.00083976646,0.00018268124,0.00028242974,0.00039101328],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002196515,0.00045173673,0.00093194714,0.00037451705,0.0007828966,0.0030632217,0.0010014046,0.0016205767,0.010468898],"category_scores_gemma":[0.005772557,0.00058873167,0.0006950864,0.0006304014,0.0017409314,0.0034039987,0.0011624093,0.0017981251,0.00046145977],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005964354,0.00041500182,0.012192959,0.00023679444,0.00022371768,0.0012698655,0.00047267313,0.23419084,0.009539194,0.7111216,0.0041228584,0.025618104],"study_design_scores_gemma":[0.00039685366,0.0004521856,0.010723585,0.0000572826,0.000171911,0.00041774393,0.0011525538,0.4192191,0.0024601533,0.5507654,0.014024229,0.00015897832],"about_ca_topic_score_codex":0.009079982,"about_ca_topic_score_gemma":0.020055564,"teacher_disagreement_score":0.010468898,"about_ca_system_score_codex":0.0023074963,"about_ca_system_score_gemma":0.003550685,"threshold_uncertainty_score":0.03502196},"labels":[],"label_agreement":null},{"id":"W4389566398","doi":"10.5547/01956574.37.2.kmal","title":"The Impact of Electricity Sector Restructuring on Coal-fired Power Plants in India","year":2016,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kellogg's (Canada)","funders":"","keywords":"Unbundling; Restructuring; Electricity; Electricity generation; Business; Nameplate capacity; Coal; Industrial organization; Electricity retailing; Natural resource economics; Power (physics); Environmental economics; Electricity market; Economics; Waste management; Finance; Engineering; Electrical engineering","score_opus":0.005156594268744106,"score_gpt":0.20191142300090784,"score_spread":0.19675482873216374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389566398","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99404365,0.0001283988,0.00009119132,0.0005588917,0.000007247012,0.000005887527,0.0002086813,0.000012823377,0.00494315],"genre_scores_gemma":[0.9994512,0.00007146038,0.000020604155,0.000041585907,0.000002778353,0.0000012977558,0.00008910588,0.0000011865798,0.0003207752],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99940634,0.00011383486,0.000021233218,0.000035632307,0.000089247056,0.00033369978],"domain_scores_gemma":[0.99854374,0.0003881086,0.0005411848,0.000076005905,0.0002447971,0.00020622576],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003524749,0.0001381928,0.00016350119,0.00039339217,0.0003871023,0.0011352651,0.0004343116,0.00034636635,0.0016494171],"category_scores_gemma":[0.0018037362,0.000107876294,0.00038483355,0.0008112485,0.00065124896,0.0005659792,0.0007863857,0.0008239901,0.00017818311],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000786998,0.00059509947,0.8684048,0.00017511935,0.0001903533,0.0039305496,0.0016643693,0.06656922,0.00526472,0.011432929,0.0054382877,0.035547633],"study_design_scores_gemma":[0.000018267967,0.00014774443,0.9859254,0.000020492504,0.000056094843,0.0002661815,0.0034200556,0.005716754,0.0013019656,0.000668992,0.0024382353,0.000019914154],"about_ca_topic_score_codex":0.11148905,"about_ca_topic_score_gemma":0.14880578,"teacher_disagreement_score":0.11148905,"about_ca_system_score_codex":0.0027002732,"about_ca_system_score_gemma":0.0018677892,"threshold_uncertainty_score":0.22168022},"labels":[],"label_agreement":null},{"id":"W4390097585","doi":"10.1109/powerafrica57932.2023.10363298","title":"Pareto Optimality in Economic-Environmental Dispatch (EED) of Grid-Generators: A Case for Nigeria","year":2023,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Economic dispatch; Pareto principle; Mathematical optimization; Multi-objective optimization; Computer science; Grid; Electricity; Pareto optimal; Snapshot (computer storage); Electricity generation; Operations research; Engineering; Electric power system; Mathematics; Power (physics)","score_opus":0.00836669747891244,"score_gpt":0.21389207871092783,"score_spread":0.20552538123201539,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390097585","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7198558,0.00066713523,0.24784957,0.00084611605,0.000054769684,0.00016621678,0.00023254605,0.000030095747,0.030297823],"genre_scores_gemma":[0.96534294,0.00020551031,0.033061888,0.000017331064,0.000005421404,0.00003809434,0.00002785686,0.0000047472754,0.0012962287],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997483,0.00014428275,0.000009217417,0.00001912122,0.00004715392,0.000031910382],"domain_scores_gemma":[0.9997633,0.00016483542,0.00002307396,0.000008919404,0.000024081288,0.000015707143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00076976116,0.00043078206,0.00036683775,0.00048405022,0.00068842893,0.00083702296,0.00030526335,0.000672184,0.0008722848],"category_scores_gemma":[0.0009969837,0.00024895417,0.00041691697,0.000575175,0.000512409,0.0005228825,0.00073787285,0.0006051011,0.000050610724],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046800247,0.000036329522,0.002300046,0.00004818368,0.000015303434,0.0007007132,0.00006885157,0.96887064,0.00046325312,0.020192334,0.00019264908,0.0070648985],"study_design_scores_gemma":[0.000022582228,0.000031285384,0.0011721083,0.00001938852,0.0000111671225,0.00011598561,0.00026241512,0.98747706,0.0003526292,0.009618068,0.0009075539,0.0000097549455],"about_ca_topic_score_codex":0.0085566,"about_ca_topic_score_gemma":0.019314457,"teacher_disagreement_score":0.0085566,"about_ca_system_score_codex":0.0007802295,"about_ca_system_score_gemma":0.00081927644,"threshold_uncertainty_score":0.01701361},"labels":[],"label_agreement":null},{"id":"W4390296028","doi":"10.1016/j.tej.2023.107352","title":"Congestion unpriced: Inefficiency and gaming in Ontario’s two-schedule electricity market design","year":2023,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Canada Energy Regulator","funders":"","keywords":"Inefficiency; Schedule; Electricity market; Electricity; Payment; Congestion management; Economics; Shadow price; Microeconomics; Business; Industrial organization; Electric power system; Finance; Power (physics); Engineering","score_opus":0.014560178166843896,"score_gpt":0.21082394423008566,"score_spread":0.19626376606324175,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390296028","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95427406,0.00015786372,0.008406922,0.001445733,0.000033148783,0.000203526,0.00062917185,0.000056727888,0.034792952],"genre_scores_gemma":[0.99400336,0.000033694025,0.0013237264,0.00005246347,0.000005921332,0.000019018922,0.00010333257,0.00001253986,0.004446034],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99890184,0.00040200955,0.000029987603,0.00010391273,0.00020196523,0.0003602353],"domain_scores_gemma":[0.9968143,0.001925613,0.00019651781,0.00012924151,0.00058517506,0.0003491908],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002226818,0.00034071947,0.0007732552,0.00067471084,0.0012357715,0.0029017448,0.0015505081,0.0012794837,0.005402051],"category_scores_gemma":[0.008971457,0.00048513245,0.00070342555,0.0007755148,0.0011062213,0.0013416244,0.0005254799,0.0011397125,0.00014753935],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012254185,0.0005344803,0.037657667,0.00013077265,0.00015660978,0.00074357155,0.0004933586,0.8178248,0.0015312058,0.10552909,0.010280456,0.02389259],"study_design_scores_gemma":[0.000276385,0.00027995196,0.021708405,0.000019451018,0.000090059126,0.00007021596,0.0006959718,0.9550628,0.00048544427,0.017001884,0.0042486712,0.000060836253],"about_ca_topic_score_codex":0.6812734,"about_ca_topic_score_gemma":0.8323847,"teacher_disagreement_score":0.3187266,"about_ca_system_score_codex":0.016169606,"about_ca_system_score_gemma":0.013058666,"threshold_uncertainty_score":0.6412073},"labels":[],"label_agreement":null},{"id":"W4390451140","doi":"10.1007/s11149-023-09467-w","title":"A simple way to integrate distributed storage into a wholesale electricity market","year":2023,"lang":"en","type":"article","venue":"Journal of Regulatory Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator","funders":"Advanced Research Projects Agency; Advanced Research Projects Agency - Energy; U.S. Department of Energy; Directorate for Engineering; National Science Foundation","keywords":"Flexibility (engineering); Bidding; Energy storage; Grid; Renewable energy; Electricity market; Electricity; Electric power system; Environmental economics; Computer science; Distributed generation; Smart grid; Wind power; Economics; Microeconomics; Power (physics); Electrical engineering; Engineering","score_opus":0.005401351651823747,"score_gpt":0.19488861739299196,"score_spread":0.1894872657411682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390451140","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046898767,0.000098398545,0.8907722,0.0011178369,0.00019631995,0.0004746158,0.00017272102,0.0007066268,0.05956236],"genre_scores_gemma":[0.84250826,0.000095127674,0.14128383,0.0001932108,0.00008897852,0.00038205684,0.00006617325,0.00009144658,0.015290854],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938345,0.00030780706,0.000024358264,0.00009657005,0.00013969424,0.000048087168],"domain_scores_gemma":[0.9995308,0.0001913604,0.000038657538,0.00012326523,0.00006755169,0.000048463655],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011324708,0.0006485426,0.00069215405,0.00036361953,0.00056617457,0.002113519,0.0013566978,0.0011543707,0.017226577],"category_scores_gemma":[0.0016683271,0.0005427734,0.0008567333,0.0004678618,0.0009614597,0.002917364,0.0018456243,0.0015603163,0.0012560077],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025576891,0.000526219,0.0009987539,0.00009462404,0.00013022027,0.00043017426,0.00012721524,0.5184204,0.007837519,0.4270105,0.003779432,0.040389195],"study_design_scores_gemma":[0.00021719674,0.00024871918,0.00034286932,0.000019230318,0.000042475385,0.00009384653,0.00006288594,0.86764985,0.001554154,0.1211668,0.00856293,0.00003913818],"about_ca_topic_score_codex":0.0020749408,"about_ca_topic_score_gemma":0.00304789,"teacher_disagreement_score":0.017226577,"about_ca_system_score_codex":0.0009209044,"about_ca_system_score_gemma":0.001170495,"threshold_uncertainty_score":0.05762863},"labels":[],"label_agreement":null},{"id":"W4391342658","doi":"10.1109/isgteurope56780.2023.10407236","title":"Learning to Predict Security Constraints for Large-Scale Unit Commitment Problems","year":2023,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Scale (ratio); Computer science; Power system simulation; Unit (ring theory); Psychology; Mathematics education; Power (physics)","score_opus":0.011918028466635096,"score_gpt":0.22998721693292037,"score_spread":0.21806918846628529,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391342658","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34517807,0.00047511296,0.6496525,0.0006299611,0.000036054196,0.000092671115,0.00008228328,0.00086554827,0.0029879236],"genre_scores_gemma":[0.92768764,0.00009893808,0.071127236,0.000088679066,0.000017730215,0.00008230165,0.00012580107,0.00004401469,0.0007277271],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965143,0.00015469646,0.000016872093,0.00007072018,0.00005482204,0.000051460236],"domain_scores_gemma":[0.9981262,0.0014467802,0.00012562911,0.000080964324,0.000168452,0.00005196479],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012525033,0.0009982075,0.0006367654,0.00034547612,0.0003584322,0.0005176399,0.00079666806,0.0009784199,0.0014461434],"category_scores_gemma":[0.0044749393,0.00045202728,0.00032453611,0.00044452443,0.0006280165,0.0012015799,0.0007926112,0.0017846903,0.0001525289],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018818946,0.000025713594,0.00033649686,0.000010471754,0.0000072184334,0.0000107467185,0.000010272904,0.985782,0.00035158658,0.00059009186,0.00018998723,0.012666481],"study_design_scores_gemma":[0.0000015475705,0.0000043535842,0.000042152606,6.47631e-7,5.9482863e-7,0.0000010592435,0.0000015293978,0.99947375,0.000103178056,0.00035733127,0.000013307288,5.65594e-7],"about_ca_topic_score_codex":0.010322441,"about_ca_topic_score_gemma":0.011510194,"teacher_disagreement_score":0.010322441,"about_ca_system_score_codex":0.0009053141,"about_ca_system_score_gemma":0.0015058517,"threshold_uncertainty_score":0.02052474},"labels":[],"label_agreement":null},{"id":"W4391696955","doi":"10.1109/tpwrs.2024.3364502","title":"Flexibility Characterization of Sustainable Power Systems in Demand Space: A Data-Driven Inverse Optimization Approach","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Natural Sciences and Engineering Research Council of Canada; Institut de Valorisation des Données","keywords":"Electric power system; Mathematical optimization; Computer science; Flexibility (engineering); Renewable energy; Robust optimization; Mathematics; Power (physics); Engineering","score_opus":0.015098532778809662,"score_gpt":0.22586097018666046,"score_spread":0.2107624374078508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391696955","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009315329,0.00004434029,0.9894343,0.0001349734,0.0000052404243,0.000018535151,0.00007557298,0.00007085815,0.0009008642],"genre_scores_gemma":[0.7551144,0.0002777249,0.24203326,0.0000966495,0.000049030146,0.00025793017,0.0005599568,0.00012057626,0.0014903692],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991968,0.0003162143,0.00004004671,0.00014930071,0.00021812932,0.000079539845],"domain_scores_gemma":[0.9981458,0.0012447821,0.00021671405,0.00014903506,0.00018814014,0.000055637352],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013487084,0.0010310418,0.0010542982,0.0013017965,0.0003274616,0.0017631793,0.00097429584,0.0008636758,0.0012427291],"category_scores_gemma":[0.0049085515,0.00078847405,0.0014338066,0.0011254831,0.0013015709,0.002179857,0.0014610125,0.001477065,0.00017952439],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014694424,0.0000133457825,0.000275528,0.00002233417,0.000011647961,0.000031247964,0.000026917654,0.9775227,0.0005952647,0.0140493335,0.00014584306,0.007291166],"study_design_scores_gemma":[0.0000016952108,0.0000052267533,0.000057965313,0.0000031756085,0.0000016091974,0.000005980667,0.0000062199592,0.99190205,0.00021583072,0.0076735644,0.0001216759,0.0000049481373],"about_ca_topic_score_codex":0.005240653,"about_ca_topic_score_gemma":0.0028100316,"teacher_disagreement_score":0.005240653,"about_ca_system_score_codex":0.001117659,"about_ca_system_score_gemma":0.0011298669,"threshold_uncertainty_score":0.010420263},"labels":[],"label_agreement":null},{"id":"W4392119575","doi":"10.1016/j.epsr.2024.110224","title":"Data-driven distributionally robust optimization approach for the coordinated dispatching of the power system considering the correlation of wind power","year":2024,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Science and Technology Project of State Grid","keywords":"Wind power; Power (physics); Electric power system; Correlation; Computer science; Mathematical optimization; Control theory (sociology); Engineering; Mathematics; Electrical engineering; Artificial intelligence; Physics","score_opus":0.03846914403992209,"score_gpt":0.2777123235749775,"score_spread":0.23924317953505542,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392119575","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004143523,0.000049416143,0.9945582,0.00008781682,0.000016992277,0.000017934623,0.000048800663,0.00009881112,0.0009784523],"genre_scores_gemma":[0.81985253,0.00027619663,0.17642994,0.00013774679,0.00007891477,0.00025003834,0.0003699218,0.00017929521,0.0024254709],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99907184,0.0003952645,0.000049296585,0.00018590537,0.00021785156,0.00007981459],"domain_scores_gemma":[0.99837804,0.0008658961,0.0002612134,0.00013513927,0.00030589398,0.000053837546],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001741132,0.0011604102,0.0011509822,0.00053646887,0.00032406213,0.0010229216,0.0012058486,0.0007150542,0.0015488052],"category_scores_gemma":[0.0037461983,0.0006534035,0.00090516877,0.0008208972,0.0007254902,0.001163374,0.0011051286,0.0015896858,0.0002879567],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009458256,0.000006078697,0.0000686729,0.000010811273,0.0000105180525,0.000014498434,0.000006471782,0.99399674,0.00017406495,0.0031673294,0.00011451309,0.0024207835],"study_design_scores_gemma":[0.0000010916245,0.000005236985,0.00001344594,6.5351446e-7,0.0000010524203,0.0000016749492,0.000001538319,0.9988456,0.000053845553,0.0010192294,0.000055479555,0.0000011342139],"about_ca_topic_score_codex":0.005120857,"about_ca_topic_score_gemma":0.0040292693,"teacher_disagreement_score":0.005120857,"about_ca_system_score_codex":0.0008814428,"about_ca_system_score_gemma":0.0015597756,"threshold_uncertainty_score":0.010182083},"labels":[],"label_agreement":null},{"id":"W4392652131","doi":"10.5194/egusphere-egu24-20054","title":"Machine learning power system emulation for rapid screening of multi-sector policies","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Emulation; Power (physics); Computer science; Business; Artificial intelligence; Economics; Economic growth","score_opus":0.02221111176636811,"score_gpt":0.24546179324499065,"score_spread":0.22325068147862254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392652131","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0828677,0.00010481093,0.90260714,0.00021389834,0.000044331435,0.00012773073,0.0003054211,0.0027834526,0.010945428],"genre_scores_gemma":[0.836536,0.000074583484,0.16019359,0.00008674837,0.000011397633,0.00025727486,0.0003347045,0.00022105902,0.0022847054],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998024,0.00010460026,0.000008672324,0.000019301075,0.00004924929,0.000015776788],"domain_scores_gemma":[0.99875116,0.00087667454,0.00010511745,0.00012305166,0.00012038484,0.000023646227],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007440556,0.0005467721,0.0004359112,0.0003551661,0.00022136235,0.000445718,0.000653152,0.00059205666,0.0042525954],"category_scores_gemma":[0.0033053444,0.00032004184,0.00031664997,0.00031388566,0.0002896288,0.00056018727,0.00041224874,0.00080834003,0.00036174158],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011947029,0.000012605372,0.00024410262,0.000012684757,0.000006913335,0.00000966892,0.0000071561926,0.9931958,0.00033413398,0.0010905946,0.00017044896,0.0049040215],"study_design_scores_gemma":[0.0000023690811,0.0000035091173,0.000029528168,0.0000012173035,6.529118e-7,0.000001171517,0.0000011279357,0.9993807,0.00018935668,0.0002607623,0.00012901446,6.156646e-7],"about_ca_topic_score_codex":0.0052169673,"about_ca_topic_score_gemma":0.0057195933,"teacher_disagreement_score":0.0052169673,"about_ca_system_score_codex":0.0005888094,"about_ca_system_score_gemma":0.00093888096,"threshold_uncertainty_score":0.014226317},"labels":[],"label_agreement":null},{"id":"W4393064797","doi":"10.1002/9781119419525.ch6","title":"Assessment of VWF clearance","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Chemistry","score_opus":0.0037411273989288816,"score_gpt":0.22999984305977114,"score_spread":0.22625871566084227,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393064797","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6113565,0.04353429,0.2464824,0.0009939907,0.00063074904,0.0009518488,0.0041833366,0.0017513148,0.0901155],"genre_scores_gemma":[0.8716515,0.017069787,0.07098984,0.00043796498,0.0001459137,0.0004968253,0.0026496213,0.00040649305,0.036152154],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992317,0.00010219954,0.000033590746,0.00009733365,0.00048439085,0.0000508172],"domain_scores_gemma":[0.99964917,0.000060786646,0.000058221878,0.000025895448,0.00017823932,0.000027571448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009883987,0.00054359244,0.0005765568,0.0012380395,0.00021969348,0.0011060565,0.0003259808,0.0005562084,0.003522255],"category_scores_gemma":[0.0011340248,0.00012737077,0.00026420964,0.0007850268,0.00025070301,0.0004593773,0.00038205925,0.0005060107,0.0013194795],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009522601,0.0002368964,0.024181403,0.0007872958,0.00013846683,0.0007565518,0.0002931933,0.0037660552,0.6180603,0.004755524,0.006173318,0.33989877],"study_design_scores_gemma":[0.00006078894,0.0020501572,0.09534731,0.00038658953,0.00029880358,0.0040538874,0.0006046259,0.036471568,0.7591268,0.005827852,0.09564992,0.000121715064],"about_ca_topic_score_codex":0.0006852993,"about_ca_topic_score_gemma":0.0008165276,"teacher_disagreement_score":0.003522255,"about_ca_system_score_codex":0.00039147,"about_ca_system_score_gemma":0.00033374745,"threshold_uncertainty_score":0.011783063},"labels":[],"label_agreement":null},{"id":"W4393554173","doi":"10.1007/s12667-024-00654-y","title":"Long-term equilibrium in electricity markets with renewables and energy storage only","year":2024,"lang":"en","type":"article","venue":"Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"St. Olavs Hospital Universitetssykehuset i Trondheim; Norges Teknisk-Naturvitenskapelige Universitet","keywords":"Term (time); Renewable energy; Electricity; Electricity system; Economics; Energy storage; Electricity market; Natural resource economics; Electricity generation; Physics; Engineering; Power (physics); Thermodynamics; Electrical engineering","score_opus":0.003950904151192476,"score_gpt":0.17901715541910765,"score_spread":0.17506625126791517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393554173","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.70738596,0.0007891042,0.25038326,0.0035595554,0.0001199754,0.00015780878,0.00072700257,0.00026367488,0.036613617],"genre_scores_gemma":[0.9895002,0.0001644299,0.004966353,0.00009616133,0.000024269262,0.00006183323,0.00009606994,0.000034950102,0.0050557135],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993036,0.00029521203,0.00002278379,0.0000928475,0.000080099875,0.0002055869],"domain_scores_gemma":[0.9964227,0.002333848,0.0005964509,0.000096518386,0.00029558322,0.00025500267],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023053545,0.00066249346,0.001439341,0.0007699387,0.000919135,0.0024343068,0.0012579197,0.0020091743,0.0073332917],"category_scores_gemma":[0.008826556,0.0008185523,0.00097651733,0.00058505655,0.0016533416,0.0041990704,0.0010968383,0.0015927136,0.00043038864],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016272717,0.00012256636,0.000997053,0.000076050805,0.00007447806,0.0003920078,0.000061141705,0.8307188,0.0011678557,0.16217001,0.0013847834,0.0026723817],"study_design_scores_gemma":[0.000079183475,0.00007071914,0.0007042781,0.000017530625,0.000021785032,0.000050481827,0.000121025834,0.92599785,0.000245073,0.072010495,0.0006516895,0.000029900337],"about_ca_topic_score_codex":0.007793781,"about_ca_topic_score_gemma":0.007867593,"teacher_disagreement_score":0.007793781,"about_ca_system_score_codex":0.0021091145,"about_ca_system_score_gemma":0.0014783378,"threshold_uncertainty_score":0.024532259},"labels":[],"label_agreement":null},{"id":"W4394875142","doi":"10.1002/9781394205097.ch12","title":"Economic Load Dispatch Solutions at Small, Medium, and Large Scales Utilizing Chaotic Spotted Hyena Optimization","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Hyena; Chaotic; Economic dispatch; Computer science; Mathematical optimization; Environmental science; Mathematics; Ecology; Physics; Electric power system; Artificial intelligence; Biology; Power (physics); Thermodynamics","score_opus":0.009057982368309628,"score_gpt":0.1996631633060348,"score_spread":0.1906051809377252,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394875142","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25580814,0.00031420874,0.728033,0.0005107086,0.00004501097,0.000073836876,0.0000568449,0.00020803018,0.014950201],"genre_scores_gemma":[0.9352846,0.00013347123,0.062067553,0.00003001014,0.0000155433,0.000061768726,0.00003998024,0.000037426773,0.0023296752],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999317,0.000024181825,0.0000035908263,0.000011387597,0.000018783821,0.000010378477],"domain_scores_gemma":[0.9997944,0.00010922313,0.000034928027,0.0000126754885,0.00003029799,0.000018454288],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037054042,0.00043876647,0.00043220836,0.00035276986,0.00032828617,0.0007632003,0.00041532627,0.0004938415,0.0011075964],"category_scores_gemma":[0.00090049556,0.00027866362,0.00037961808,0.00026058563,0.00051170203,0.0005994419,0.0007018971,0.000496615,0.00011048026],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014198285,0.000009427721,0.00030462543,0.000010758626,0.000009120083,0.000022149896,0.000013705667,0.9924114,0.00047540155,0.002412607,0.00011266692,0.0042039193],"study_design_scores_gemma":[0.000002841313,0.0000056250815,0.000055724173,8.105879e-7,0.0000012137281,0.000002239136,0.0000052743267,0.9991792,0.00007767578,0.0005841428,0.00008420922,0.0000010955941],"about_ca_topic_score_codex":0.0036685958,"about_ca_topic_score_gemma":0.0029616503,"teacher_disagreement_score":0.0036685958,"about_ca_system_score_codex":0.00043092007,"about_ca_system_score_gemma":0.0006908479,"threshold_uncertainty_score":0.007294476},"labels":[],"label_agreement":null},{"id":"W4396967659","doi":"10.1002/nem.2276","title":"A distributed algorithm with network‐independent step‐size and event‐triggered mechanism for economic dispatch problem","year":2024,"lang":"en","type":"article","venue":"International Journal of Network Management","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"National Natural Science Foundation of China","keywords":"Computer science; Mechanism (biology); Event (particle physics); Economic dispatch; Algorithm; Distributed computing","score_opus":0.003308274439550115,"score_gpt":0.20612919699996962,"score_spread":0.2028209225604195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396967659","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008795561,0.00009460778,0.98919374,0.00013231672,0.000042615015,0.000054496806,0.000013744813,0.00012971926,0.0015431002],"genre_scores_gemma":[0.6168652,0.0001658435,0.37856644,0.00013707094,0.000060353817,0.00044906768,0.000086736276,0.000061498715,0.0036078251],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996141,0.00013088113,0.000021662703,0.00008568754,0.000103384045,0.000044187822],"domain_scores_gemma":[0.99885213,0.0007007586,0.000095531344,0.00006585784,0.00022044587,0.00006540081],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010436579,0.00076757575,0.0009300958,0.00045095393,0.00044350416,0.0007970466,0.0014683085,0.0013435219,0.0023975815],"category_scores_gemma":[0.0026043085,0.00027506924,0.0004274505,0.0004937779,0.00059109903,0.0007634239,0.0010063023,0.0010732169,0.00031944775],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009537299,0.000071155846,0.0002962854,0.00005006525,0.000024100344,0.000051932977,0.000027143275,0.95469475,0.001525743,0.0086929165,0.0010225645,0.03344785],"study_design_scores_gemma":[0.00002157998,0.000013707877,0.000017244962,0.000001627302,0.0000017765967,0.0000052061496,0.00000201421,0.9988386,0.00014372784,0.0008241172,0.00012872576,0.0000016699883],"about_ca_topic_score_codex":0.0024242683,"about_ca_topic_score_gemma":0.0021450927,"teacher_disagreement_score":0.0024242683,"about_ca_system_score_codex":0.0006576048,"about_ca_system_score_gemma":0.0013183928,"threshold_uncertainty_score":0.008020639},"labels":[],"label_agreement":null},{"id":"W4398205642","doi":"10.1115/1.887738_ch2","title":"Evaluating Hydro-Québec’s Decarbonization Pathways Using Integrated Asset-Centric Electrical Power System Evolution Modeling","year":2024,"lang":"en","type":"book-chapter","venue":"ASME eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Asset (computer security); Electric power system; Power (physics); Computer science; Physics; Thermodynamics; Computer security","score_opus":0.027396209615278496,"score_gpt":0.23444869637604318,"score_spread":0.20705248676076468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4398205642","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4797535,0.0038274454,0.16536544,0.0036409413,0.00021627141,0.0004878513,0.01191995,0.0014444477,0.33334398],"genre_scores_gemma":[0.9314859,0.0016929725,0.035281304,0.00018971524,0.0000205798,0.00015314487,0.00288867,0.00012734208,0.028160427],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998204,0.00005537605,0.0000045788966,0.000027051701,0.000064633816,0.000028086564],"domain_scores_gemma":[0.99972934,0.00012122291,0.000016468879,0.000015851687,0.00009563383,0.000021548407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047526316,0.0006327363,0.0003079262,0.000521466,0.0005742465,0.0019586084,0.00086103275,0.0006906307,0.0028269633],"category_scores_gemma":[0.0009843835,0.00028227133,0.00052778143,0.000968481,0.00033473238,0.0006950467,0.0004190229,0.0005592505,0.0002324981],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017701916,0.0000114908335,0.0016173787,0.000028026518,0.000020631433,0.000043025888,0.00002583786,0.9807458,0.00030701322,0.006111376,0.0021259687,0.008945751],"study_design_scores_gemma":[0.000006040823,0.000011460385,0.0011795058,0.000022857543,0.000011390693,0.000007749073,0.000042984993,0.993022,0.00030331485,0.0014019827,0.0039811223,0.000009611465],"about_ca_topic_score_codex":0.8272086,"about_ca_topic_score_gemma":0.86474097,"teacher_disagreement_score":0.98560625,"about_ca_system_score_codex":0.014393757,"about_ca_system_score_gemma":0.007178214,"threshold_uncertainty_score":0.34761798},"labels":[],"label_agreement":null},{"id":"W4399637406","doi":"10.2139/ssrn.4859994","title":"Alberta's Electricity Futures Market: An Empirical Analysis of Price Formation","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Futures contract; Futures market; Electricity market; Economics; Financial economics; Electricity; Business; Engineering; Electrical engineering","score_opus":0.006220578771200162,"score_gpt":0.24625123445564373,"score_spread":0.24003065568444357,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399637406","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98333824,0.00047102018,0.0014516809,0.0007510486,0.000023405246,0.000027182014,0.0011796558,0.00004434539,0.012713411],"genre_scores_gemma":[0.99382246,0.00021421221,0.00045861278,0.000039215767,0.000017547827,0.0000050928384,0.0013692268,0.0000091093025,0.004064561],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99965894,0.000086268396,0.000012224869,0.000044283464,0.00013283893,0.00006536413],"domain_scores_gemma":[0.9957087,0.0024339878,0.00045056356,0.00022170326,0.0008200471,0.0003649615],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011513907,0.00024076151,0.00035572847,0.000994675,0.00091020693,0.001786391,0.0010388002,0.00066159025,0.004697654],"category_scores_gemma":[0.008538992,0.0002078591,0.00033271464,0.0020385396,0.0008336052,0.0011032127,0.0005183329,0.0010252021,0.00031773016],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0030511068,0.0011168716,0.65376616,0.00018888053,0.0004101283,0.0014599161,0.0014175879,0.1484581,0.0025187146,0.093842156,0.03366849,0.060102023],"study_design_scores_gemma":[0.00023527279,0.00027191214,0.58878595,0.000043754222,0.00028160642,0.00023259321,0.0033605886,0.3727195,0.0018072033,0.019681398,0.012460601,0.00011955985],"about_ca_topic_score_codex":0.7231298,"about_ca_topic_score_gemma":0.7877579,"teacher_disagreement_score":0.2768702,"about_ca_system_score_codex":0.0048018615,"about_ca_system_score_gemma":0.0048867576,"threshold_uncertainty_score":0.5570015},"labels":[],"label_agreement":null},{"id":"W4399653803","doi":"10.2172/2371670","title":"Barriers and Opportunities To Realize the System Value of Interregional Transmission","year":2024,"lang":"en","type":"report","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Environment Research Council; Pacific Northwest National Laboratory; Independent Electricity System Operator; National Renewable Energy Laboratory; U.S. Department of Energy","keywords":"Value (mathematics); Transmission (telecommunications); Business; Transmission system; Telecommunications; Computer science; Industrial organization; Environmental economics; Economics","score_opus":0.028767928446873803,"score_gpt":0.24839306372965525,"score_spread":0.21962513528278144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399653803","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27067265,0.005427317,0.14278437,0.018779462,0.00018490698,0.0002909927,0.00034227144,0.00037053323,0.5611475],"genre_scores_gemma":[0.96373534,0.002288873,0.021499077,0.0003452832,0.000024370736,0.00008158889,0.00011646059,0.000084993626,0.011824124],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9957145,0.0015774756,0.00021731378,0.00020335286,0.0017212253,0.0005660765],"domain_scores_gemma":[0.99489176,0.0016326836,0.0009926307,0.000582179,0.0016540092,0.0002466646],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004083095,0.0004197049,0.0003570615,0.0007810132,0.0014571443,0.0065825963,0.0009749202,0.0008282342,0.005592279],"category_scores_gemma":[0.00776274,0.0003180808,0.00040443268,0.0009571393,0.0018321284,0.0044964883,0.0029671425,0.0017150064,0.00059633906],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015715827,0.00017649788,0.033316016,0.0009850422,0.0001122593,0.0010046486,0.008940904,0.053522896,0.008507583,0.68738484,0.008972428,0.19691974],"study_design_scores_gemma":[0.000057167057,0.0004613982,0.055094887,0.0035627864,0.00020140295,0.0018876991,0.051210444,0.023643792,0.0107388785,0.25044808,0.6025052,0.0001882605],"about_ca_topic_score_codex":0.011713731,"about_ca_topic_score_gemma":0.031145573,"teacher_disagreement_score":0.011713731,"about_ca_system_score_codex":0.0027835034,"about_ca_system_score_gemma":0.0068206014,"threshold_uncertainty_score":0.023291111},"labels":[],"label_agreement":null},{"id":"W4400448484","doi":"10.1016/j.epsr.2024.110711","title":"Multi-agent reinforcement learning for multi-area power exchange","year":2024,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Texas A and M Engineering Experiment Station, Texas A and M University","keywords":"Reinforcement learning; Dispatchable generation; Benchmark (surveying); Computer science; Electric power system; Mathematical optimization; Renewable energy; Economic dispatch; Distributed computing; Power (physics); Artificial intelligence; Engineering; Distributed generation; Mathematics","score_opus":0.0721754271301066,"score_gpt":0.33688829147201044,"score_spread":0.26471286434190383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400448484","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05174704,0.00029413798,0.94303465,0.00035624145,0.00008739685,0.000068534435,0.0000352748,0.0002882033,0.0040884926],"genre_scores_gemma":[0.96394664,0.00007532049,0.03329033,0.000057755075,0.000028114147,0.000088130655,0.00003151369,0.000026477654,0.002455643],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951506,0.00023493473,0.000022946086,0.00007718218,0.000077705,0.00007220406],"domain_scores_gemma":[0.9982765,0.0011413161,0.00017127172,0.00007987604,0.00021796956,0.000113082744],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001624131,0.0007393714,0.0014619429,0.0004208752,0.00055101694,0.0007305503,0.0012539374,0.0013463034,0.0027833804],"category_scores_gemma":[0.003673762,0.0004473553,0.0004575228,0.00038475578,0.00089898205,0.00090492726,0.0013283247,0.0012960685,0.0002837627],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032346114,0.000026443773,0.00014203668,0.000014467512,0.000014252223,0.00002722668,0.0000142995195,0.99139446,0.00020124011,0.001880942,0.00022712164,0.0060250815],"study_design_scores_gemma":[0.000005230114,0.000008021645,0.000017662951,8.7355056e-7,0.0000012802981,0.000002033275,0.0000012467126,0.9992593,0.00003088663,0.0006304437,0.000042059768,9.480248e-7],"about_ca_topic_score_codex":0.007579644,"about_ca_topic_score_gemma":0.0052080485,"teacher_disagreement_score":0.007579644,"about_ca_system_score_codex":0.0008547034,"about_ca_system_score_gemma":0.00084742083,"threshold_uncertainty_score":0.015071094},"labels":[],"label_agreement":null},{"id":"W4400898300","doi":"10.55016/ojs/sppp.v17i1.78356","title":"Market Design for the 21st Century: Recommendations for Alberta’s Power Market","year":2024,"lang":"en","type":"article","venue":"The School of Public Policy Publications","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Flexibility (engineering); Renewable energy; Environmental economics; Electricity; Variable renewable energy; Fossil fuel; Electricity market; Supply and demand; Electricity generation; Mains electricity; Natural resource economics; Wind power; Natural gas prices; Business; Economics; Electric power system; Engineering; Power (physics); Microeconomics; Waste management","score_opus":0.030875794170692975,"score_gpt":0.2820021588394843,"score_spread":0.25112636466879135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400898300","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019300472,0.06545701,0.121953815,0.38297537,0.005898045,0.00085469737,0.0014763445,0.0014961138,0.4005881],"genre_scores_gemma":[0.40099075,0.07646545,0.20267121,0.04386674,0.0040070014,0.0012876255,0.002349853,0.0005121515,0.26784924],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9971097,0.0006839084,0.00009635107,0.00015809586,0.0015253243,0.00042661466],"domain_scores_gemma":[0.9933909,0.0017435357,0.0002509972,0.00017795345,0.0035385664,0.000898027],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0069147074,0.001402222,0.001040145,0.0018303468,0.0019037485,0.008774408,0.0037996068,0.0060699806,0.025208246],"category_scores_gemma":[0.010430291,0.0005328765,0.000987909,0.0020203488,0.0034674713,0.0062996554,0.0018293547,0.004129059,0.0026044273],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000084762934,0.00017175902,0.0010457303,0.00042798973,0.000029726765,0.00032854924,0.00036562106,0.04108044,0.00068206666,0.6057539,0.24207939,0.1079501],"study_design_scores_gemma":[0.0002200055,0.00013325924,0.0012442438,0.001273236,0.00005360387,0.0001380314,0.0019187985,0.033004504,0.00048007857,0.33541662,0.6259797,0.00013797455],"about_ca_topic_score_codex":0.26579744,"about_ca_topic_score_gemma":0.4520313,"teacher_disagreement_score":0.73420256,"about_ca_system_score_codex":0.021235794,"about_ca_system_score_gemma":0.043084335,"threshold_uncertainty_score":0.5285007},"labels":[],"label_agreement":null},{"id":"W4401222465","doi":"10.1016/j.epsr.2024.110932","title":"Demand response assisted energy and reserve procurement in renewable integrated dynamic energy market","year":2024,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Renewable energy; Demand response; Procurement; Energy market; Variable renewable energy; Environmental economics; Energy demand; Energy (signal processing); Natural resource economics; Business; Economics; Electric power system; Engineering; Electrical engineering; Power (physics); Electricity","score_opus":0.014337590506021703,"score_gpt":0.27230078665701485,"score_spread":0.25796319615099317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401222465","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5972359,0.0007304082,0.35391864,0.00160766,0.00023516167,0.00012387743,0.0003954926,0.00038183597,0.045370962],"genre_scores_gemma":[0.9932296,0.000056985093,0.0027671922,0.000023584698,0.000019575778,0.000013558647,0.000030534433,0.000017760303,0.0038412139],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99964595,0.00016615185,0.0000091471575,0.000056277124,0.000041087205,0.00008138424],"domain_scores_gemma":[0.9989819,0.0007073246,0.00008304199,0.00004763955,0.00010664755,0.00007340238],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011633016,0.00034267138,0.0009078835,0.0002537252,0.00030033878,0.0013976702,0.00079279894,0.00075107586,0.0058693215],"category_scores_gemma":[0.0023341319,0.00037557693,0.0003822172,0.00033191784,0.00046052889,0.0015655712,0.0005730325,0.0008195422,0.00035099615],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00058684754,0.00022279959,0.00091091666,0.00010363515,0.000037784306,0.00026852393,0.000051935196,0.9179536,0.002855096,0.057382256,0.0027895246,0.016836975],"study_design_scores_gemma":[0.000010935694,0.00004135385,0.00022957091,0.0000022177749,0.000006206903,0.000018437122,0.000027951435,0.9927695,0.00021623279,0.00643606,0.00023634969,0.000005282138],"about_ca_topic_score_codex":0.0017060108,"about_ca_topic_score_gemma":0.0019112581,"teacher_disagreement_score":0.0058693215,"about_ca_system_score_codex":0.0006922976,"about_ca_system_score_gemma":0.0005695682,"threshold_uncertainty_score":0.019634843},"labels":[],"label_agreement":null},{"id":"W4401893304","doi":"10.1007/s10957-024-02518-y","title":"An Adaptive Distributionally Robust Optimization Approach for Optimal Sizing of Hybrid Renewable Energy Systems","year":2024,"lang":"en","type":"article","venue":"Journal of Optimization Theory and Applications","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Sizing; Mathematical optimization; Renewable energy; Robust optimization; Theory of computation; Stochastic programming; Mathematics; Computer science; Engineering; Algorithm","score_opus":0.008154231816268995,"score_gpt":0.21059023431970939,"score_spread":0.2024360025034404,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401893304","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0045504407,0.00008896937,0.99334913,0.000082845094,0.000036233305,0.000021241915,0.000016956184,0.00008480818,0.0017693175],"genre_scores_gemma":[0.7776874,0.00028151664,0.2155498,0.00019997674,0.0002055546,0.00028422914,0.00014421159,0.00023302899,0.0054143],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99942124,0.000251785,0.000029004676,0.00008667269,0.00016621259,0.000045233668],"domain_scores_gemma":[0.9984913,0.0009901889,0.00013997301,0.00007511532,0.00026444957,0.00003888141],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019098059,0.0011480269,0.0016395382,0.00066619297,0.0003181985,0.0010785516,0.0011971485,0.0009997155,0.0030362643],"category_scores_gemma":[0.00422684,0.0008476865,0.0008412573,0.00064176985,0.0008667781,0.0010628459,0.0013310056,0.001203007,0.0003749777],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002528093,0.00001646325,0.000045445566,0.000026655805,0.000026767304,0.000014272709,0.00001138344,0.98337376,0.00062303245,0.0051554167,0.0002506242,0.010430901],"study_design_scores_gemma":[0.0000020639343,0.0000073777255,0.000008604583,0.0000010723461,0.0000013649957,0.0000012372633,8.519358e-7,0.9989802,0.000039418836,0.0009108942,0.000045686982,0.0000011318339],"about_ca_topic_score_codex":0.002895284,"about_ca_topic_score_gemma":0.0029699958,"teacher_disagreement_score":0.0030362643,"about_ca_system_score_codex":0.0006540699,"about_ca_system_score_gemma":0.00081656413,"threshold_uncertainty_score":0.010157287},"labels":[],"label_agreement":null},{"id":"W4402642962","doi":"10.1080/03155986.2026.2657103","title":"Can an EV storage system exercise market power in an electricity market? A comparison of bi-level and single-level models","year":2024,"lang":"en","type":"preprint","venue":"INFOR Information Systems and Operational Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ford Motor Company; National Science Foundation","keywords":"Electricity market; Electricity; Power (physics); Business; Electrical engineering; Engineering; Physics; Thermodynamics","score_opus":0.08677483552171619,"score_gpt":0.3227296239763287,"score_spread":0.2359547884546125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402642962","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7692348,0.0016649849,0.1484609,0.004454677,0.00021522713,0.00013136974,0.0011109071,0.00038490244,0.074342236],"genre_scores_gemma":[0.9934122,0.0002218868,0.0015412465,0.00007273359,0.000023639388,0.000022005144,0.00007971752,0.000030658524,0.0045957887],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995542,0.00017399479,0.000015484753,0.00006992968,0.000053080952,0.00013333776],"domain_scores_gemma":[0.9980242,0.0013573774,0.00018237694,0.00010013121,0.00017572586,0.0001602088],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016185682,0.0005961353,0.0017451431,0.00047928237,0.00046614787,0.0031670749,0.002142662,0.0026588042,0.008848107],"category_scores_gemma":[0.0045984886,0.00067439745,0.0013653478,0.00065851636,0.0010556354,0.005879842,0.00090617663,0.0013774591,0.0005763087],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031600584,0.00009186118,0.0014201623,0.00009636228,0.00006740985,0.00010995382,0.000062631276,0.928534,0.00052107516,0.06309446,0.0011202354,0.004565886],"study_design_scores_gemma":[0.000029224177,0.00003283704,0.00047388003,0.0000067198944,0.000021714397,0.0000113544575,0.000045253924,0.98876303,0.00006779032,0.010313886,0.00022601408,0.000008342174],"about_ca_topic_score_codex":0.014906552,"about_ca_topic_score_gemma":0.010187077,"teacher_disagreement_score":0.014906552,"about_ca_system_score_codex":0.001408843,"about_ca_system_score_gemma":0.0010865098,"threshold_uncertainty_score":0.029639602},"labels":[],"label_agreement":null},{"id":"W4403928111","doi":"10.2139/ssrn.5006488","title":"The Stochastic Behavior of Electricity Prices Under Scrutiny: Evidence from Spot and Futures Markets","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Scrutiny; Futures contract; Spot contract; Economics; Electricity; Financial economics; Econometrics; Engineering; Political science; Law; Electrical engineering","score_opus":0.008683515022428938,"score_gpt":0.23448600784176374,"score_spread":0.2258024928193348,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403928111","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9951593,0.0004185625,0.0004318633,0.0006958676,0.000013957239,0.000006751681,0.0002525755,0.000010346769,0.0030107615],"genre_scores_gemma":[0.9988747,0.00029936657,0.00009006377,0.000050210187,0.00003898785,0.000002554647,0.000298982,0.0000070372926,0.00033815927],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99790716,0.00062299165,0.00015810555,0.00034034823,0.00073662004,0.00023483792],"domain_scores_gemma":[0.8901717,0.07638254,0.023793176,0.0040494925,0.0043422678,0.0012608141],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040361336,0.00023612927,0.0006688327,0.0013502436,0.00058693235,0.0025400126,0.0007695617,0.0017485839,0.003475875],"category_scores_gemma":[0.06345654,0.000357204,0.00056073104,0.0017781148,0.0015648246,0.0035058681,0.0010536867,0.001791414,0.00049125386],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.006968401,0.0011954323,0.854379,0.0004113129,0.0013919605,0.002097833,0.0027424693,0.023794077,0.0052815233,0.03222756,0.010944756,0.058565672],"study_design_scores_gemma":[0.00043252308,0.0006763403,0.92896336,0.000083442,0.000435729,0.00062278815,0.0020745087,0.034340695,0.002727006,0.02295348,0.0065561435,0.00013409204],"about_ca_topic_score_codex":0.009448957,"about_ca_topic_score_gemma":0.0053777127,"teacher_disagreement_score":0.009448957,"about_ca_system_score_codex":0.00053249975,"about_ca_system_score_gemma":0.00046429955,"threshold_uncertainty_score":0.021345317},"labels":[],"label_agreement":null},{"id":"W4403967613","doi":"10.2139/ssrn.5007070","title":"Monthly and Quarter-Hourly Hydro Scheduling for Assessing Retrofit of Conventional to Reversible Turbines with Wind and Pv Integration","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Quarter (Canadian coin); Environmental science; Scheduling (production processes); Meteorology; Computer science; Marine engineering; Automotive engineering; Engineering; Operations management; Electrical engineering; History; Geography","score_opus":0.006779968174788365,"score_gpt":0.229129152399914,"score_spread":0.22234918422512562,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403967613","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99658453,0.000015446525,0.001968159,0.000016091144,0.000008476405,0.000011801083,0.00061795797,0.00007163958,0.0007058631],"genre_scores_gemma":[0.9985268,0.0000062949835,0.00096564874,0.0000020635127,0.000002450445,0.0000044469093,0.00030899464,0.0000072896305,0.00017594318],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998286,0.000058997528,0.0000106846865,0.000035993853,0.000043260396,0.000022453134],"domain_scores_gemma":[0.9991035,0.0004266582,0.000116154275,0.00006224315,0.00014175252,0.00014978448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050826214,0.00039700678,0.00040838477,0.00067996344,0.00019484953,0.00040077209,0.0003206203,0.0005110596,0.0012137642],"category_scores_gemma":[0.0012174131,0.00018425605,0.00031586873,0.0005966443,0.00012455878,0.00036733504,0.00017183497,0.0002738172,0.00019853126],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0027505844,0.0006188992,0.16677195,0.000098153614,0.00021011427,0.0002722297,0.00012287362,0.7789675,0.012293552,0.0006483998,0.001579975,0.035665818],"study_design_scores_gemma":[0.0000470012,0.000697667,0.1621044,0.0000050533504,0.000046884175,0.00006551072,0.0001478959,0.83274734,0.0034366094,0.00035513248,0.00032362886,0.000022819033],"about_ca_topic_score_codex":0.0065703187,"about_ca_topic_score_gemma":0.009233501,"teacher_disagreement_score":0.0065703187,"about_ca_system_score_codex":0.00029850466,"about_ca_system_score_gemma":0.00028927697,"threshold_uncertainty_score":0.013064146},"labels":[],"label_agreement":null},{"id":"W4404056536","doi":"10.1016/j.ejor.2024.10.033","title":"On the valuation of legacy power production in liberalized markets via option-pricing","year":2024,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Valuation (finance); Production (economics); Economics; Microeconomics; Business; Variable pricing; Industrial organization; Financial economics; Finance","score_opus":0.05150839692378708,"score_gpt":0.3160417182370171,"score_spread":0.26453332131323004,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404056536","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21552995,0.0022548535,0.73968786,0.0033974387,0.0002211969,0.0001266394,0.00019289293,0.00013343003,0.038455654],"genre_scores_gemma":[0.9689544,0.00097597425,0.023656823,0.00015502046,0.00016016435,0.00007786523,0.00008572849,0.000046777248,0.0058872],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9980763,0.0012152332,0.000063923675,0.00019095333,0.00025267332,0.0002009215],"domain_scores_gemma":[0.99230427,0.005382612,0.0008345919,0.00045800107,0.00053343276,0.0004871764],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046785325,0.0013494105,0.0014523815,0.0011946799,0.0011023994,0.0054128733,0.001981436,0.0032420086,0.0072618257],"category_scores_gemma":[0.014648581,0.00060213916,0.0025616712,0.0011038333,0.0047930875,0.0064071654,0.0023410167,0.003573596,0.00036423886],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051844247,0.00006278888,0.000914715,0.000052602256,0.00004179679,0.0002752851,0.000121431076,0.19427408,0.0009728073,0.79873544,0.0006056671,0.003891567],"study_design_scores_gemma":[0.000021491525,0.000039790317,0.0003944418,0.000034833723,0.00002121883,0.000049916714,0.000053688123,0.71114504,0.00017474362,0.28735897,0.00067088526,0.000034902525],"about_ca_topic_score_codex":0.005857347,"about_ca_topic_score_gemma":0.0031512368,"teacher_disagreement_score":0.0072618257,"about_ca_system_score_codex":0.0023040178,"about_ca_system_score_gemma":0.0020465038,"threshold_uncertainty_score":0.024742723},"labels":[],"label_agreement":null},{"id":"W4404345647","doi":"10.2139/ssrn.4976130","title":"Extremal Dependence in Australian Electricity Markets","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Electricity; Economics; Business; Agricultural economics; Engineering; Electrical engineering","score_opus":0.007896446523018777,"score_gpt":0.22563912704569675,"score_spread":0.21774268052267798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404345647","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91189325,0.0010724624,0.021414464,0.0030744562,0.00006974957,0.000016917511,0.0002220911,0.00007102467,0.062165607],"genre_scores_gemma":[0.99309087,0.00028312596,0.00065638067,0.00005049045,0.000035075052,0.000006533685,0.00005415533,0.000017393342,0.0058059674],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99960595,0.00015407988,0.000013738479,0.000051984338,0.00008772479,0.00008656553],"domain_scores_gemma":[0.9978709,0.0011157179,0.00030522555,0.0001728219,0.00029430058,0.00024099434],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012150013,0.00021395893,0.0008235776,0.0010561942,0.0010691233,0.0022945069,0.0008215448,0.000795152,0.0070015574],"category_scores_gemma":[0.0095601035,0.00033752815,0.00045802526,0.0010533169,0.0016467434,0.0024343461,0.0013202061,0.0022285753,0.00022272405],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023884053,0.000066298,0.006170426,0.00011339034,0.000061721024,0.00041424678,0.00040765223,0.05801762,0.0006480314,0.90979046,0.007335025,0.01673639],"study_design_scores_gemma":[0.00003545342,0.00004250643,0.020518923,0.000041281353,0.0000292238,0.00016452151,0.00038321828,0.28343555,0.00025437714,0.69165325,0.0034048562,0.000036870297],"about_ca_topic_score_codex":0.0138828335,"about_ca_topic_score_gemma":0.012593194,"teacher_disagreement_score":0.0138828335,"about_ca_system_score_codex":0.0017609064,"about_ca_system_score_gemma":0.00082594785,"threshold_uncertainty_score":0.027604103},"labels":[],"label_agreement":null},{"id":"W4404694283","doi":"10.1016/j.apenergy.2024.124923","title":"Feasibility-guaranteed machine learning unit commitment: Fuzzy Optimization approaches","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; Toronto Metropolitan University","funders":"","keywords":"Unit (ring theory); Fuzzy logic; Power system simulation; Computer science; Artificial intelligence; Engineering; Mathematical optimization; Mathematics; Electric power system; Mathematics education; Physics","score_opus":0.022772150099923005,"score_gpt":0.2057186705244642,"score_spread":0.18294652042454118,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404694283","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015169404,0.0008876273,0.9760216,0.00068787567,0.000057779613,0.00005955896,0.00015938742,0.00029488505,0.006661924],"genre_scores_gemma":[0.7643508,0.00087892317,0.2281488,0.00036935945,0.00016756666,0.00027133222,0.00048028457,0.00017788199,0.0051551173],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99924016,0.0002920927,0.00003508649,0.0001651848,0.00016241801,0.00010510946],"domain_scores_gemma":[0.9975268,0.0017872996,0.00018872695,0.0001096432,0.00031464588,0.00007287975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020127334,0.0014553602,0.0014472158,0.00073872734,0.00046818057,0.00130523,0.001932076,0.0014187119,0.0044169878],"category_scores_gemma":[0.00493072,0.00085605856,0.0009939881,0.0009573346,0.0009159266,0.0015293988,0.0011678648,0.002451684,0.00046176207],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032476244,0.0000258743,0.00022098761,0.000043846798,0.00002178585,0.000028697325,0.000015951522,0.9763501,0.0001339242,0.008445866,0.00062427483,0.0140561685],"study_design_scores_gemma":[0.0000033437639,0.0000056464587,0.000022800106,0.0000063243424,0.0000023680327,0.0000028372958,0.0000035869039,0.9941391,0.000057007856,0.005614539,0.00014070235,0.0000018678629],"about_ca_topic_score_codex":0.009581094,"about_ca_topic_score_gemma":0.007040823,"teacher_disagreement_score":0.009581094,"about_ca_system_score_codex":0.0014740749,"about_ca_system_score_gemma":0.0016063398,"threshold_uncertainty_score":0.019050658},"labels":[],"label_agreement":null},{"id":"W4405400437","doi":"10.3808/jeil.202400140","title":"A Factorial Fractional Chance-Constrained Programming Model for Regional Electricity Systems Management under GHG Emission Mitigation — A Case Study of Saskatchewan, Canada","year":2024,"lang":"en","type":"article","venue":"Journal of Environmental Informatics Letters","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Regina","funders":"Natural Resources Canada; SaskPower; Mitacs; Government of Canada","keywords":"Greenhouse gas; Fractional factorial design; Electricity; Electricity system; Factorial; Factorial analysis; Environmental science; Operations research; Econometrics; Factorial experiment; Electricity generation; Economics; Engineering; Mathematics; Statistics; Power (physics); Ecology","score_opus":0.008757628941817456,"score_gpt":0.20330973402786054,"score_spread":0.1945521050860431,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405400437","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5543091,0.0007920926,0.3717875,0.0019975442,0.00014432054,0.00043968964,0.0018782235,0.00036417638,0.06828738],"genre_scores_gemma":[0.95985067,0.00026072885,0.024870163,0.00011321511,0.000014903853,0.00015902978,0.0002725222,0.000030246041,0.014428596],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966586,0.00009577562,0.0000080749705,0.000057023695,0.00004835875,0.00012481517],"domain_scores_gemma":[0.99955803,0.00024384659,0.000033404704,0.00001259245,0.00010684072,0.0000452623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064273266,0.0009131213,0.00062046107,0.0005806139,0.001075384,0.0016505349,0.0013045918,0.0013495577,0.003571829],"category_scores_gemma":[0.0009398767,0.0004087104,0.0008798368,0.0009972369,0.000858395,0.0005388139,0.0006057341,0.00077900075,0.00015708717],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000243219,0.000014599536,0.0004669101,0.000009845989,0.000009945959,0.00008932841,0.0000122246765,0.99367225,0.00030419388,0.0036047397,0.00031022666,0.0014813679],"study_design_scores_gemma":[0.000008074912,0.000012058498,0.00029535466,0.0000024863527,0.000006284725,0.000007850844,0.000032117074,0.99831533,0.000096170595,0.0008120058,0.0004061123,0.000006230657],"about_ca_topic_score_codex":0.626075,"about_ca_topic_score_gemma":0.622053,"teacher_disagreement_score":0.37392497,"about_ca_system_score_codex":0.007579845,"about_ca_system_score_gemma":0.008708308,"threshold_uncertainty_score":0.7522542},"labels":[],"label_agreement":null},{"id":"W4406290668","doi":"10.5267/j.ac.2024.10.002","title":"Exploring the evolution of scientific publication on portfolio optimization in the light of artificial intelligence: A bibliometric study","year":2025,"lang":"en","type":"article","venue":"Accounting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Portfolio; Field (mathematics); Data science; Computer science; Transformative learning; Context (archaeology); Management science; Bibliometrics; Artificial intelligence; Knowledge management; Sociology; Data mining; Engineering","score_opus":0.03909395225912605,"score_gpt":0.2645421556346679,"score_spread":0.22544820337554183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406290668","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75074214,0.10945377,0.0124055445,0.010505676,0.0005517902,0.00024029221,0.020693757,0.000414056,0.09499294],"genre_scores_gemma":[0.9188029,0.057088543,0.007900497,0.0004582624,0.0013391711,0.00020850806,0.0097936625,0.00016898933,0.0042394088],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.98786956,0.0026775221,0.0017665352,0.0011490954,0.006062721,0.0004745462],"domain_scores_gemma":[0.868597,0.08267274,0.024059545,0.0047458205,0.01830245,0.0016224043],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.011126089,0.00054293533,0.0013468523,0.09341244,0.0015748987,0.009576828,0.0010272318,0.0010343737,0.0037480583],"category_scores_gemma":[0.081323996,0.00031270523,0.00067626964,0.23468429,0.002363087,0.008696902,0.003141517,0.00071407604,0.0010904751],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027744283,0.00018532896,0.4218222,0.009070187,0.0010005622,0.0015005027,0.016435338,0.0051664803,0.0026147652,0.07800798,0.031766836,0.43215245],"study_design_scores_gemma":[0.000042585638,0.00023182223,0.6770496,0.0061590434,0.001044939,0.0025927525,0.018883672,0.013231966,0.004166982,0.032008402,0.24433728,0.0002508649],"about_ca_topic_score_codex":0.003760062,"about_ca_topic_score_gemma":0.00500955,"teacher_disagreement_score":0.90658754,"about_ca_system_score_codex":0.0025318891,"about_ca_system_score_gemma":0.004282566,"threshold_uncertainty_score":0.05884105},"labels":[],"label_agreement":null},{"id":"W4406354569","doi":"10.1109/tpwrs.2025.3528864","title":"Generation Planning and Operation Under Power Stability Constraints: A Hydro-Quebec Use Case","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Electric power system; Stability (learning theory); Electricity generation; Power (physics); Control theory (sociology); Computer science; Engineering; Operations research; Reliability engineering; Control engineering; Mathematical optimization; Mathematics; Control (management)","score_opus":0.02629836294089091,"score_gpt":0.24203929074780411,"score_spread":0.2157409278069132,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406354569","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8576169,0.0010164094,0.022737043,0.0029418988,0.00005823637,0.00047620095,0.005030505,0.00026196486,0.10986072],"genre_scores_gemma":[0.9830562,0.0002515114,0.0070312857,0.00012672249,0.000012015965,0.00006998074,0.0005788388,0.000035637626,0.008837676],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99946326,0.00017983386,0.000015855512,0.00005339281,0.000108153705,0.00017954479],"domain_scores_gemma":[0.99859184,0.0007584683,0.00008269116,0.00006783254,0.00033934877,0.00015972185],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00082957937,0.0006372656,0.00034853266,0.0009112578,0.0014345141,0.0019917246,0.0014209679,0.0015731106,0.0061529195],"category_scores_gemma":[0.0026296845,0.00035721727,0.0005033615,0.0016361964,0.0008975865,0.0007551523,0.0007894931,0.00089360535,0.0002779721],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025480075,0.00021412404,0.014845943,0.00011812451,0.000075788244,0.00355673,0.0002583211,0.93555665,0.0011205942,0.019524025,0.0077652615,0.016709596],"study_design_scores_gemma":[0.00019753886,0.00016527103,0.013640441,0.000060565668,0.000068811954,0.00037791903,0.00095405156,0.9684425,0.0009715556,0.0034393677,0.011624956,0.000057080964],"about_ca_topic_score_codex":0.8584503,"about_ca_topic_score_gemma":0.8913478,"teacher_disagreement_score":0.1415497,"about_ca_system_score_codex":0.010746421,"about_ca_system_score_gemma":0.0051680817,"threshold_uncertainty_score":0.2847666},"labels":[],"label_agreement":null},{"id":"W4406822216","doi":"10.1016/j.eneco.2025.108221","title":"Risk mitigation in project finance for utility-scale solar PV projects","year":2025,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University; Canada Excellence Research Chairs, Government of Canada; Shahid Beheshti University","keywords":"Scale (ratio); Project finance; Finance; Economics; Photovoltaic system; Environmental economics; Business; Actuarial science; Engineering; Geography","score_opus":0.0049692886690174895,"score_gpt":0.1928547736117314,"score_spread":0.1878854849427139,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406822216","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7130072,0.0027486356,0.26835793,0.0009848224,0.000058792713,0.00019913424,0.00016893503,0.0002957874,0.014178754],"genre_scores_gemma":[0.99378854,0.00027452697,0.0054133823,0.000018870582,0.000011828565,0.000018524042,0.000026247273,0.0000071502827,0.0004409791],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9987331,0.00065567717,0.0000491418,0.000128407,0.00029457145,0.00013914211],"domain_scores_gemma":[0.99678695,0.0016751797,0.0009423407,0.00020958956,0.0002714904,0.000114493574],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029825198,0.0005619454,0.0004548784,0.000771377,0.00031505252,0.0013254978,0.00067940145,0.0007467691,0.0013947417],"category_scores_gemma":[0.009733613,0.00023503586,0.00042302776,0.00055876106,0.0005398353,0.0017050202,0.0010590425,0.0007955484,0.00013737101],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026627872,0.00016595738,0.025553942,0.00015779323,0.00009224902,0.0004988838,0.00015669716,0.800118,0.00447866,0.053557165,0.0014076529,0.11354669],"study_design_scores_gemma":[0.000040832176,0.0004554461,0.010186403,0.00009155525,0.000045353445,0.00026364907,0.00015367109,0.9522094,0.0034827192,0.030333405,0.0026999786,0.00003752947],"about_ca_topic_score_codex":0.0010169748,"about_ca_topic_score_gemma":0.0009204355,"teacher_disagreement_score":0.0029825198,"about_ca_system_score_codex":0.00089271297,"about_ca_system_score_gemma":0.0005778929,"threshold_uncertainty_score":0.015773296},"labels":[],"label_agreement":null},{"id":"W4407184618","doi":"10.1111/1756-2171.12488","title":"Strategic Reneging and Market Power in Sequential Markets","year":2025,"lang":"en","type":"article","venue":"The RAND Journal of Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"HEC Montréal","funders":"Agence Nationale de la Recherche","keywords":"Market power; Economics; Microeconomics; Power (physics); Industrial organization; Business; Monopoly","score_opus":0.0072641100080446915,"score_gpt":0.19232829594239595,"score_spread":0.18506418593435126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407184618","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91560256,0.00025260373,0.061899547,0.0012218369,0.000027234826,0.00007309864,0.000096454605,0.00014293319,0.020683596],"genre_scores_gemma":[0.9980317,0.00003687786,0.0009931932,0.000035426656,0.00000781416,0.000008538876,0.00000774206,0.0000053227855,0.0008733719],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9983187,0.00086197484,0.000047933478,0.0002489536,0.00018790174,0.000334543],"domain_scores_gemma":[0.98671174,0.008359914,0.0030950226,0.0007842593,0.00042570525,0.0006232683],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004164535,0.000414631,0.00077341223,0.0004643834,0.0006640314,0.0017781688,0.0010703931,0.001160733,0.008099708],"category_scores_gemma":[0.018900752,0.00040848428,0.0005050323,0.00037477346,0.002371498,0.0035139672,0.001025065,0.001517473,0.0002722343],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011017552,0.0004849945,0.021286009,0.00016510292,0.000252072,0.0012999546,0.00084113394,0.54974437,0.0077370782,0.3798627,0.0021721513,0.03505264],"study_design_scores_gemma":[0.00028737317,0.0002832945,0.008087962,0.000022741491,0.00004862639,0.00019639751,0.0004777523,0.72897816,0.0012599479,0.25705358,0.0032485514,0.000055626908],"about_ca_topic_score_codex":0.0069866413,"about_ca_topic_score_gemma":0.0067048,"teacher_disagreement_score":0.008099708,"about_ca_system_score_codex":0.0017483883,"about_ca_system_score_gemma":0.0011430003,"threshold_uncertainty_score":0.027096212},"labels":[],"label_agreement":null},{"id":"W4407253046","doi":"10.1016/j.eneco.2025.108284","title":"Alberta's electricity futures market: An empirical analysis of price formation","year":2025,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto; Carleton University","funders":"","keywords":"Futures contract; Futures market; Economics; Electricity market; Electricity; Financial economics; Econometrics; Engineering","score_opus":0.003919542320279362,"score_gpt":0.20489002616920562,"score_spread":0.20097048384892627,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407253046","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9885053,0.000306263,0.000987715,0.00040737924,0.000014633106,0.000032018997,0.0020168792,0.000030229063,0.0076996866],"genre_scores_gemma":[0.9925653,0.00016242935,0.00045791754,0.000040765648,0.000013306527,0.000010170973,0.003070031,0.000010020241,0.0036701558],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99946743,0.00012223652,0.000021989978,0.00007176285,0.00021615706,0.000100381934],"domain_scores_gemma":[0.9932613,0.003882203,0.0008897004,0.00030374748,0.0011772729,0.00048570707],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001273822,0.00023427517,0.0003810775,0.0011961841,0.00079924235,0.0015289423,0.00095155236,0.00061204453,0.00415275],"category_scores_gemma":[0.0076113245,0.00019476614,0.00039165144,0.0023355547,0.00065723044,0.0008083023,0.00056910235,0.0011859507,0.0004128898],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00081869384,0.00040523667,0.90538585,0.00008543259,0.000277256,0.0010173159,0.0010637055,0.034848586,0.0013748755,0.015884997,0.0129041085,0.025933947],"study_design_scores_gemma":[0.000053357024,0.00012145479,0.86177355,0.000023286984,0.00007954276,0.00023137484,0.0018611784,0.12381846,0.00060004217,0.0027338082,0.008640207,0.000063651445],"about_ca_topic_score_codex":0.7343635,"about_ca_topic_score_gemma":0.6893319,"teacher_disagreement_score":0.7343635,"about_ca_system_score_codex":0.004939827,"about_ca_system_score_gemma":0.0036405483,"threshold_uncertainty_score":0.5344018},"labels":[],"label_agreement":null},{"id":"W4407852406","doi":"10.1016/j.cor.2025.107024","title":"Bidding in day-ahead electricity markets: A dynamic programming framework","year":2025,"lang":"en","type":"article","venue":"Computers & Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Université de Montréal; Minnow Environmental (Canada)","funders":"","keywords":"Bidding; Electricity; Computer science; Dynamic programming; Electricity market; Operations research; Environmental economics; Mathematical optimization; Business; Microeconomics; Economics; Algorithm; Mathematics; Electrical engineering; Engineering","score_opus":0.015994443215017758,"score_gpt":0.3331045051665095,"score_spread":0.3171100619514918,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407852406","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018912999,0.00082599034,0.96225303,0.0015398666,0.00010960542,0.000080791535,0.00018172862,0.00012838599,0.015967721],"genre_scores_gemma":[0.80885404,0.0017108085,0.15805613,0.0005183331,0.00034126063,0.00037698785,0.00033499533,0.00030994503,0.029497536],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982146,0.0011722507,0.00004361371,0.00017619824,0.00018423535,0.00020914484],"domain_scores_gemma":[0.99639505,0.0029175754,0.00018494019,0.00008262688,0.00020310855,0.00021666926],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003930317,0.0013595406,0.002707478,0.00080977095,0.00084919465,0.0037432506,0.00329989,0.0028168196,0.0063657262],"category_scores_gemma":[0.0077286894,0.0022462714,0.0015750193,0.0013875524,0.001933684,0.0035771907,0.0018821573,0.002973562,0.00060779287],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041958538,0.00008996547,0.00018372427,0.000057967263,0.00004553119,0.000075946235,0.000047815487,0.89182323,0.00016076806,0.10116752,0.0015083201,0.004797243],"study_design_scores_gemma":[0.000009533068,0.000010771993,0.000032836262,0.000005128198,0.000007915502,0.000009184665,0.000010749374,0.9715056,0.0000261434,0.02805037,0.00032593097,0.0000059133263],"about_ca_topic_score_codex":0.0074309288,"about_ca_topic_score_gemma":0.008484717,"teacher_disagreement_score":0.0074309288,"about_ca_system_score_codex":0.0017533731,"about_ca_system_score_gemma":0.0024236352,"threshold_uncertainty_score":0.021295428},"labels":[],"label_agreement":null},{"id":"W4407891073","doi":"10.18280/jesa.580105","title":"A Hybrid Moth Flam Algorithm Based on Particle Swarm Optimization for Unit Commitment Problem Solving","year":2025,"lang":"en","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Particle swarm optimization; Mathematical optimization; Unit (ring theory); Multi-swarm optimization; Computer science; Metaheuristic; Swarm behaviour; Particle (ecology); Algorithm; Mathematics; Biology; Ecology","score_opus":0.011829081164277052,"score_gpt":0.23537201101660096,"score_spread":0.2235429298523239,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407891073","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020250883,0.0004017832,0.971512,0.00019561323,0.00018155441,0.0000766275,0.00006219846,0.00055495277,0.0067643886],"genre_scores_gemma":[0.4509973,0.00032291075,0.5412609,0.00027541662,0.00012992595,0.00042224547,0.00026075536,0.00012635849,0.006204219],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975413,0.0000762471,0.000012992297,0.00003887427,0.00009038693,0.00002743378],"domain_scores_gemma":[0.9996724,0.00016001888,0.000024909712,0.00002695867,0.000095365926,0.00002039867],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005611446,0.00069478434,0.0010385988,0.00048438043,0.0004017582,0.0006690597,0.0012792308,0.0012896409,0.0035984444],"category_scores_gemma":[0.0012311308,0.00039606058,0.00066701724,0.00070901436,0.00026461147,0.00059334637,0.00075125555,0.0010016928,0.00053802255],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000114721435,0.000087335655,0.00044882155,0.000113446105,0.00010232819,0.00005986217,0.00003769128,0.8343251,0.0032398964,0.003536811,0.0022750387,0.155659],"study_design_scores_gemma":[0.000010135896,0.000023491317,0.000050716473,0.000003005747,0.0000043149757,0.0000067584633,0.000002331494,0.99914646,0.00019826424,0.00025635408,0.00029544215,0.0000026652006],"about_ca_topic_score_codex":0.0042953338,"about_ca_topic_score_gemma":0.004611063,"teacher_disagreement_score":0.0042953338,"about_ca_system_score_codex":0.00026730666,"about_ca_system_score_gemma":0.00062241644,"threshold_uncertainty_score":0.0120379925},"labels":[],"label_agreement":null},{"id":"W4408144902","doi":"10.1109/icjece.2024.3454290","title":"The Gray Wolf Optimization-Based Transmission Expansion Planning in Renewable-Rich Power Systems","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Computer science; Gray (unit); Medicine","score_opus":0.003033252617835838,"score_gpt":0.16845063975570443,"score_spread":0.16541738713786858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408144902","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037354067,0.0004962589,0.9561534,0.00022899963,0.000028426404,0.000047290287,0.000059979597,0.0001845436,0.0054470305],"genre_scores_gemma":[0.88379663,0.00051602005,0.112178504,0.00008750541,0.00002172131,0.00011879836,0.00008816985,0.00007955302,0.0031131185],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973506,0.00014884786,0.000008337272,0.000028908524,0.000051545143,0.000027203134],"domain_scores_gemma":[0.99956065,0.0002910431,0.000052372594,0.000018816034,0.00005244947,0.000024659375],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000734329,0.0006369256,0.0007587991,0.0004981528,0.00024391075,0.0005832104,0.00053954,0.00048030226,0.0010082033],"category_scores_gemma":[0.001507399,0.0004219635,0.0003927018,0.00066987186,0.00062892213,0.0008029045,0.00051277183,0.0005456031,0.00012961205],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004435235,0.000003095927,0.000062164974,0.0000069629536,0.0000051222905,0.000015114088,0.0000051530405,0.994334,0.00007356509,0.00226919,0.000091570524,0.0031296548],"study_design_scores_gemma":[0.000001583136,0.0000036520441,0.000019993611,0.0000017264908,0.0000012361359,0.0000029539358,0.0000018955537,0.9981851,0.000046337107,0.0016618957,0.00007257657,9.734164e-7],"about_ca_topic_score_codex":0.008419026,"about_ca_topic_score_gemma":0.005769941,"teacher_disagreement_score":0.008419026,"about_ca_system_score_codex":0.00076009345,"about_ca_system_score_gemma":0.0011178517,"threshold_uncertainty_score":0.016740084},"labels":[],"label_agreement":null},{"id":"W4409158386","doi":"10.1016/j.erss.2025.104052","title":"From investment to net benefits: A review of guidelines and methodologies for cost–benefit analysis in the electricity sector","year":2025,"lang":"en","type":"review","venue":"Energy Research & Social Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"H2020 Marie Skłodowska-Curie Actions","keywords":"Investment (military); Electricity; Cost–benefit analysis; Business; Environmental economics; Natural resource economics; Industrial organization; Economics; Risk analysis (engineering); Engineering","score_opus":0.2624884892417818,"score_gpt":0.4851529172078148,"score_spread":0.22266442796603297,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409158386","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00037507113,0.97474265,0.013551325,0.005137149,0.0004090936,0.00022769009,0.00036530802,0.000034313405,0.005157482],"genre_scores_gemma":[0.007997501,0.96706545,0.02168834,0.0015742661,0.00034576067,0.000497361,0.00023432403,0.000042448348,0.0005546008],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.97911614,0.0097644115,0.0037817683,0.0010266162,0.0059914985,0.00031967042],"domain_scores_gemma":[0.9386806,0.05051585,0.0039007512,0.001007657,0.00560948,0.00028576594],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022872617,0.002332245,0.0031817423,0.013174201,0.0008252312,0.0058273887,0.0038601207,0.003214094,0.005280447],"category_scores_gemma":[0.055171262,0.0012685051,0.0034784155,0.017648248,0.0027508524,0.005800986,0.0020940944,0.0045083608,0.0014219913],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000704213,0.00010297707,0.00062372116,0.11832145,0.0005808284,0.00019744907,0.00078643207,0.009028393,0.00051289273,0.15987329,0.037417937,0.67248416],"study_design_scores_gemma":[0.000039559538,0.00013316197,0.0022188881,0.21114786,0.0008187579,0.00044740792,0.000568252,0.003020725,0.00054330885,0.091618694,0.68932104,0.00012245457],"about_ca_topic_score_codex":0.010790241,"about_ca_topic_score_gemma":0.016216855,"teacher_disagreement_score":0.022872617,"about_ca_system_score_codex":0.008831171,"about_ca_system_score_gemma":0.014785637,"threshold_uncertainty_score":0.120963395},"labels":[],"label_agreement":null},{"id":"W4409879650","doi":"10.1016/j.eneco.2025.108505","title":"Evaluating the role of information disclosure on bidding behavior in wholesale electricity markets","year":2025,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund; Social Sciences and Humanities Research Council of Canada; Fundação de Apoio à Pesquisa do Distrito Federal; Conselho Nacional de Desenvolvimento Científico e Tecnológico","keywords":"Bidding; Electricity; Business; Microeconomics; Industrial organization; Economics","score_opus":0.0056226787192180435,"score_gpt":0.21953681361289196,"score_spread":0.21391413489367392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409879650","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.995427,0.00008186386,0.0023262645,0.0004356379,0.000013555263,0.000015951862,0.000042291234,0.000016062691,0.0016414131],"genre_scores_gemma":[0.9992632,0.000029283034,0.00024649865,0.000021330718,0.000010813737,0.000003379093,0.000023751967,0.0000036663691,0.00039793775],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99671364,0.0024059056,0.00011650038,0.0001613579,0.00027949037,0.00032325037],"domain_scores_gemma":[0.79607844,0.18817152,0.009475335,0.0024413336,0.0024159306,0.0014173087],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010125436,0.00050034997,0.00078477844,0.0004592236,0.00051731884,0.002071979,0.000708786,0.0014540829,0.0027933377],"category_scores_gemma":[0.07289869,0.00043798587,0.00048765,0.0005204424,0.0012105659,0.003028405,0.0005942174,0.0017363582,0.00023838619],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.013594923,0.0050606634,0.29862526,0.00036510432,0.0005111057,0.0009171687,0.0009567152,0.5900702,0.0052225688,0.040235505,0.0025014486,0.041939273],"study_design_scores_gemma":[0.0003066374,0.0013685153,0.050991464,0.000020591324,0.00016595445,0.00011926537,0.0007190743,0.92641234,0.0025045616,0.01698697,0.00034566675,0.000058906335],"about_ca_topic_score_codex":0.0048786085,"about_ca_topic_score_gemma":0.004106523,"teacher_disagreement_score":0.010125436,"about_ca_system_score_codex":0.0011844113,"about_ca_system_score_gemma":0.0012194959,"threshold_uncertainty_score":0.05354911},"labels":[],"label_agreement":null},{"id":"W4410152917","doi":"10.1109/tii.2025.3563596","title":"DRL-Based Distributed Coordination of ISO and DSOs in Bi-Level Electricity Markets","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Fundamental Research Funds for the Central Universities; National Natural Science Foundation of China","keywords":"Electricity; Business; Computer science; Environmental economics; Electrical engineering; Engineering; Economics","score_opus":0.018928009841710267,"score_gpt":0.2247102045315446,"score_spread":0.20578219468983433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410152917","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.111706756,0.000211538,0.8754552,0.00050537055,0.00007109096,0.00010116057,0.000048472884,0.00057386997,0.01132661],"genre_scores_gemma":[0.9822823,0.00003206184,0.01579959,0.000071598566,0.0000092111695,0.000039479255,0.000018804445,0.000017669017,0.0017293276],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938405,0.00019264729,0.000026710755,0.00016189841,0.00009963215,0.0001350697],"domain_scores_gemma":[0.9992004,0.00033551035,0.00014498594,0.0000729966,0.00014337432,0.000102681086],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011951716,0.0005650739,0.0008667904,0.00024031523,0.00045713552,0.0009739965,0.0012124701,0.00087810855,0.0027020923],"category_scores_gemma":[0.0022285818,0.0003486749,0.00035222096,0.0002681214,0.00082415855,0.0011907972,0.0015398286,0.0011069756,0.00042092457],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009121957,0.00006165783,0.000639122,0.000024294326,0.000014844154,0.00007923488,0.000053799788,0.9733147,0.0014325153,0.0062770722,0.00051302667,0.017498557],"study_design_scores_gemma":[0.000008313457,0.00001981504,0.00005170583,0.0000012005752,0.0000021109547,0.000005976594,0.000007235439,0.9986303,0.00017228209,0.00096876064,0.00013029597,0.0000020789569],"about_ca_topic_score_codex":0.006132187,"about_ca_topic_score_gemma":0.005326806,"teacher_disagreement_score":0.006132187,"about_ca_system_score_codex":0.0007982875,"about_ca_system_score_gemma":0.0010507066,"threshold_uncertainty_score":0.012192965},"labels":[],"label_agreement":null},{"id":"W4410502412","doi":"10.3390/su17104618","title":"Toward Sustainable Electricity Markets: Merit-Order Dynamics on Photovoltaic Energy Price Duck Curve and Emissions Displacement","year":2025,"lang":"en","type":"article","venue":"Sustainability","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Canada First Research Excellence Fund; University of Alberta","keywords":"Photovoltaic system; Electricity; Economics; Displacement (psychology); Order (exchange); Sustainable energy; Energy (signal processing); Natural resource economics; Environmental economics; Environmental science; Renewable energy; Physics; Engineering; Electrical engineering","score_opus":0.0027660930162676047,"score_gpt":0.21250075532062424,"score_spread":0.20973466230435664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410502412","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9794175,0.0001474883,0.007187266,0.0006054429,0.000015984202,0.000021368878,0.00045203225,0.000054498225,0.01209832],"genre_scores_gemma":[0.99778455,0.000049433165,0.0008764649,0.000028877175,0.0000021735102,0.0000048320862,0.00012924473,0.000011168726,0.0011133052],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998772,0.000034207693,0.0000030085364,0.000015521076,0.000028778886,0.0000412907],"domain_scores_gemma":[0.99937433,0.00027563464,0.000113600436,0.000042972628,0.000105726715,0.00008777241],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052498677,0.00024578953,0.00027847957,0.00042845673,0.00038936269,0.0016469832,0.00048670336,0.00079944765,0.0024521693],"category_scores_gemma":[0.0037230598,0.00017684039,0.0003299045,0.0005454648,0.00082078535,0.0010409956,0.00052557606,0.00097105553,0.00015962719],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011547236,0.00007812476,0.032463025,0.00002950106,0.00002537796,0.00020642164,0.00018525781,0.9182463,0.0015398642,0.03986146,0.00208508,0.0051641427],"study_design_scores_gemma":[0.000024105264,0.000052923235,0.022941424,0.000014128718,0.000008398263,0.000042928736,0.00033097013,0.9538293,0.0005647417,0.01943246,0.002725341,0.000033308213],"about_ca_topic_score_codex":0.15163834,"about_ca_topic_score_gemma":0.16770658,"teacher_disagreement_score":0.15163834,"about_ca_system_score_codex":0.003019334,"about_ca_system_score_gemma":0.0013657659,"threshold_uncertainty_score":0.3015114},"labels":[],"label_agreement":null},{"id":"W4411306671","doi":"10.1016/j.ref.2025.100725","title":"A global optimization framework for joint generation and transmission expansion planning with AC power flow representation","year":2025,"lang":"en","type":"article","venue":"Renewable energy focus","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Johns Hopkins University","keywords":"Power flow; Representation (politics); Joint (building); Flow (mathematics); Transmission (telecommunications); Power (physics); Mathematical optimization; Computer science; Control theory (sociology); Mathematics; Electric power system; Engineering; Structural engineering; Telecommunications; Physics; Artificial intelligence; Political science","score_opus":0.010282634316417556,"score_gpt":0.23303077455762375,"score_spread":0.2227481402412062,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411306671","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016253268,0.00014991773,0.9930831,0.00010817866,0.000032580992,0.000017666236,0.00007640096,0.00010861397,0.0047981567],"genre_scores_gemma":[0.36936536,0.0008200513,0.6168361,0.00018176959,0.00020745973,0.00037025654,0.0005651653,0.000415649,0.011238143],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99964154,0.00016184177,0.000014025479,0.0000531841,0.00009402698,0.000035303856],"domain_scores_gemma":[0.9996325,0.00019476796,0.000028298504,0.00003505791,0.00008557716,0.00002384346],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001267574,0.0012625284,0.001305105,0.0006054236,0.0004410046,0.0014983182,0.0011829699,0.00093211234,0.005113375],"category_scores_gemma":[0.0016666331,0.00061413733,0.0010733461,0.0011948142,0.0006677503,0.0014033527,0.0013298563,0.001434833,0.0006553024],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009866768,0.0000127393905,0.000031876818,0.00001947344,0.000011825812,0.00001288699,0.000008170023,0.9557134,0.00016141824,0.035159096,0.0008671113,0.007992093],"study_design_scores_gemma":[0.000003462576,0.00000728046,0.000011386107,0.0000033823396,0.0000033974827,0.0000027413757,0.000002561289,0.9879276,0.00004177399,0.011435186,0.000559087,0.0000020515515],"about_ca_topic_score_codex":0.0072177486,"about_ca_topic_score_gemma":0.0077229505,"teacher_disagreement_score":0.0072177486,"about_ca_system_score_codex":0.000668287,"about_ca_system_score_gemma":0.0014143991,"threshold_uncertainty_score":0.017105877},"labels":[],"label_agreement":null},{"id":"W4411613773","doi":"10.1016/j.energy.2025.137001","title":"Benefits evaluation method for short-term scheduling of cascade hydropower station group in historical data-scarce regions","year":2025,"lang":"en","type":"article","venue":"Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"United Nations University Institute for Water, Environment, and Health","funders":"China Scholarship Council; National Natural Science Foundation of China; Hubei Provincial Department of Education","keywords":"Hydropower; Cascade; Scheduling (production processes); Term (time); Group (periodic table); Operations research; Computer science; Environmental science; Engineering; Operations management; Chemistry; Physics; Electrical engineering","score_opus":0.03705183204511837,"score_gpt":0.3119987737038595,"score_spread":0.2749469416587411,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411613773","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3476561,0.0008982544,0.6371386,0.00043350048,0.00011965012,0.0003669585,0.0008510408,0.00048172002,0.012054127],"genre_scores_gemma":[0.9368354,0.00013379968,0.06074897,0.000028880931,0.000034791337,0.00012313573,0.0003270475,0.000035686735,0.0017321465],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993487,0.00022956262,0.000032165713,0.000099350145,0.00018683379,0.000103430444],"domain_scores_gemma":[0.9987399,0.0007359123,0.00008586927,0.000041570343,0.00031053333,0.00008632482],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020978875,0.00065929786,0.00073237636,0.0016951809,0.0004336745,0.0010517291,0.0008051045,0.000579804,0.0035069045],"category_scores_gemma":[0.0034969307,0.00024161235,0.0005682478,0.0010008623,0.00024629344,0.00086218957,0.0005176979,0.00040495215,0.00015232469],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036516713,0.00013486878,0.0075030797,0.0001370052,0.00010130378,0.0001270352,0.000084369436,0.89784443,0.0019387751,0.005620884,0.0016389904,0.08450419],"study_design_scores_gemma":[0.000011325915,0.000049602688,0.0013586406,0.0000081322405,0.000023806166,0.000015376869,0.000042657102,0.99671066,0.0003361898,0.0011562854,0.00028210937,0.0000051895768],"about_ca_topic_score_codex":0.009437489,"about_ca_topic_score_gemma":0.009690243,"teacher_disagreement_score":0.009437489,"about_ca_system_score_codex":0.0011217837,"about_ca_system_score_gemma":0.0015977854,"threshold_uncertainty_score":0.018765152},"labels":[],"label_agreement":null},{"id":"W4411710847","doi":"10.1016/j.apenergy.2025.126333","title":"Computation of weighted average cost of capital (WACC) in the power sector for African countries and the implications for country-specific electricity technology cost","year":2025,"lang":"en","type":"article","venue":"Applied Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"Pokhara University Research Center","keywords":"Weighted average cost of capital; Computation; Electricity; Capital cost; Cost of capital; Economics; Capital (architecture); Power (physics); Econometrics; Business; Engineering; Computer science; Microeconomics; Macroeconomics; Electrical engineering; Financial capital; Capital formation; Economic growth; Human capital; Geography; Algorithm; Thermodynamics","score_opus":0.004414773723426559,"score_gpt":0.19978493221257704,"score_spread":0.19537015848915049,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411710847","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95837384,0.00077837834,0.03222512,0.00033745437,0.000047434023,0.000051420004,0.0017871571,0.000074884614,0.006324413],"genre_scores_gemma":[0.9889165,0.00016666866,0.0098204585,0.000010942084,0.0000049996565,0.000024953431,0.0003930853,0.000021159554,0.00064113934],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996357,0.00015965616,0.000023022969,0.00005892233,0.000056172255,0.00006656328],"domain_scores_gemma":[0.9980122,0.0013206181,0.00017318626,0.00010771547,0.00032529552,0.00006099852],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011494189,0.00041712943,0.0005178005,0.001102931,0.00035677588,0.0014805137,0.00058957114,0.00066379574,0.002458766],"category_scores_gemma":[0.0067699724,0.00040005028,0.0006897617,0.0025180061,0.00032440433,0.0018143428,0.00036303798,0.0005075178,0.00013048692],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013976595,0.000034483197,0.02567292,0.00010428289,0.00008979448,0.00021287793,0.00007874614,0.94208705,0.00046953597,0.014225482,0.00092785415,0.015957154],"study_design_scores_gemma":[0.000017703593,0.0000689587,0.023448631,0.000037271242,0.000057797555,0.00013411627,0.0004027594,0.96358913,0.0011237812,0.009617253,0.0014790425,0.000023483552],"about_ca_topic_score_codex":0.029359754,"about_ca_topic_score_gemma":0.030594526,"teacher_disagreement_score":0.029359754,"about_ca_system_score_codex":0.0017861956,"about_ca_system_score_gemma":0.0015215671,"threshold_uncertainty_score":0.058377743},"labels":[],"label_agreement":null},{"id":"W4411787420","doi":"10.3390/jrfm18070355","title":"Arbitrage Returns on the MISO Exchange","year":2025,"lang":"en","type":"article","venue":"Journal of risk and financial management","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Arbitrage; Economics; Monetary economics; Econometrics; Financial economics; Business","score_opus":0.003359225501558689,"score_gpt":0.17740442121253783,"score_spread":0.17404519571097915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411787420","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99407285,0.00024587818,0.0027550028,0.000275546,0.000015174945,0.000007449276,0.00005989102,0.000023441138,0.002544701],"genre_scores_gemma":[0.99942696,0.00005442481,0.00013356472,0.000008580686,0.000014347528,0.0000019759568,0.000032183976,0.0000027557055,0.00032526956],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9991615,0.00025252553,0.000051040144,0.00011278131,0.00031163567,0.000110520734],"domain_scores_gemma":[0.98887104,0.007875418,0.0019518951,0.00054854027,0.0004058544,0.0003472674],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026737766,0.00035241342,0.0006247557,0.0007951951,0.00027774324,0.0014513673,0.0005214427,0.0006658619,0.002318876],"category_scores_gemma":[0.021717029,0.0001380424,0.00053113565,0.0006323363,0.00096574257,0.0027919565,0.0008893348,0.0013436736,0.00020033449],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0033891108,0.00054624106,0.26296717,0.00020120964,0.00055635825,0.0030813625,0.0006874701,0.51453507,0.01184358,0.10857515,0.0026913504,0.09092596],"study_design_scores_gemma":[0.00014124419,0.0010386659,0.23822722,0.00004813829,0.00019528129,0.0007317865,0.00042771362,0.6867386,0.007351686,0.062313057,0.0026236938,0.00016296332],"about_ca_topic_score_codex":0.0009430188,"about_ca_topic_score_gemma":0.00072075246,"teacher_disagreement_score":0.0026737766,"about_ca_system_score_codex":0.00068041106,"about_ca_system_score_gemma":0.00024301333,"threshold_uncertainty_score":0.014140427},"labels":[],"label_agreement":null},{"id":"W4411924039","doi":"10.1016/j.nexres.2025.100566","title":"Moroccan wind projects status and economic profitability based wind potential of different Moroccan sites","year":2025,"lang":"en","type":"article","venue":"Next research.","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Profitability index; Wind power; Business; Natural resource economics; Environmental science; Economics; Engineering; Finance; Electrical engineering","score_opus":0.025090095430199803,"score_gpt":0.2861648309181341,"score_spread":0.2610747354879343,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411924039","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99719185,0.00012851048,0.00007231135,0.00006029849,0.000002439191,0.0000023658545,0.0005557034,0.000002830631,0.001983685],"genre_scores_gemma":[0.99911565,0.00003653816,0.00003648398,0.00000459814,0.000001875846,0.0000011921943,0.0002500471,8.834071e-7,0.0005526521],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99990106,0.00002486715,0.0000066095176,0.000013245605,0.000017747565,0.000036531746],"domain_scores_gemma":[0.9996227,0.00012344797,0.00009848533,0.00001345513,0.000093805145,0.00004810598],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002274004,0.00014543386,0.00011411836,0.0005827392,0.00017145723,0.00055145536,0.00012145592,0.00015010138,0.0032084023],"category_scores_gemma":[0.0005473574,0.000074867,0.00021222241,0.0005635037,0.00014149673,0.00022925346,0.0002488436,0.00013654721,0.0002735268],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002568091,0.00004420147,0.9739032,0.00004800125,0.00017250229,0.00051672326,0.00030969732,0.008151727,0.002135565,0.0012415355,0.0015706093,0.011649414],"study_design_scores_gemma":[0.000002891856,0.000020545314,0.99538213,0.000011366831,0.00002673873,0.000064207445,0.00060955,0.0027410737,0.0002062853,0.000097463555,0.0008336337,0.0000041510216],"about_ca_topic_score_codex":0.03689228,"about_ca_topic_score_gemma":0.07465027,"teacher_disagreement_score":0.03689228,"about_ca_system_score_codex":0.0006310278,"about_ca_system_score_gemma":0.0002671115,"threshold_uncertainty_score":0.07335514},"labels":[],"label_agreement":null},{"id":"W4412651215","doi":"10.1016/j.tej.2025.107484","title":"Electricity market design with increasing renewable generation: Lessons from Alberta","year":2025,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"SGS (Canada); University of Calgary; University of Alberta","funders":"Social Sciences and Humanities Research Council; Social Sciences and Humanities Research Council of Canada; Canada First Research Excellence Fund; University of Alberta","keywords":"Renewable energy; Electricity market; Electricity generation; Electricity; Electricity retailing; Natural resource economics; Business; Environmental economics; Industrial organization; Economics; Engineering; Power (physics); Electrical engineering","score_opus":0.012836858397250968,"score_gpt":0.21637187137447442,"score_spread":0.20353501297722346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412651215","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.565027,0.0035208643,0.04313665,0.017567376,0.00023205945,0.00013816854,0.0008494909,0.00022088262,0.3693076],"genre_scores_gemma":[0.96745425,0.00134506,0.0070889452,0.00048783768,0.00004037536,0.000019360432,0.00020885054,0.000031499043,0.023323728],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9996469,0.00011130392,0.00000922825,0.000033206925,0.00011484573,0.000084497275],"domain_scores_gemma":[0.9993998,0.0002099096,0.00004526018,0.000043485587,0.0002246497,0.00007685467],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00076781644,0.00033677282,0.0004700475,0.000331606,0.0011869175,0.0029202397,0.001340501,0.0012773813,0.0049667796],"category_scores_gemma":[0.0018007881,0.00024746187,0.0005417601,0.0007510869,0.0016564274,0.0013970415,0.00083651306,0.0012731968,0.00025640387],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017506597,0.00013804447,0.005922714,0.00013824947,0.000063009385,0.0008391327,0.0003919357,0.41174406,0.0012212965,0.5462701,0.01084463,0.022251846],"study_design_scores_gemma":[0.00042135487,0.00016540269,0.010269631,0.0001078653,0.00012273258,0.00027412688,0.0024483884,0.545148,0.0013704057,0.3493146,0.09023044,0.00012699122],"about_ca_topic_score_codex":0.67264587,"about_ca_topic_score_gemma":0.7278771,"teacher_disagreement_score":0.32735413,"about_ca_system_score_codex":0.010216978,"about_ca_system_score_gemma":0.008952391,"threshold_uncertainty_score":0.658564},"labels":[],"label_agreement":null},{"id":"W4412699161","doi":"10.3390/en18154019","title":"Price Impacts of Energy Transition on the Interconnected Wholesale Electricity Markets in the Northeast United States","year":2025,"lang":"en","type":"article","venue":"Energies","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"National Natural Science Foundation of China; Ford Foundation","keywords":"Hydroelectricity; Renewable energy; Electricity; Electricity market; Order (exchange); Economics; Business; Agricultural economics; Natural resource economics; Engineering; Finance","score_opus":0.00357005966963644,"score_gpt":0.18419566878972338,"score_spread":0.18062560912008693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412699161","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9964139,0.000058435144,0.00025273502,0.00024001401,0.0000071017084,0.0000040744862,0.00031806456,0.000013082024,0.002692622],"genre_scores_gemma":[0.9992368,0.0000326804,0.0000458575,0.000029793524,0.000002887752,0.000001808754,0.00022238912,0.0000029598045,0.0004247509],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99982435,0.00004891965,0.000009237321,0.000031977794,0.00003607009,0.000049395672],"domain_scores_gemma":[0.99905175,0.00036252555,0.00028922135,0.000038027498,0.00015608915,0.00010237465],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039624737,0.00013770531,0.00021335819,0.00031322622,0.0002683784,0.0012674943,0.00030255687,0.00030368104,0.0039041166],"category_scores_gemma":[0.0023102984,0.0001209865,0.0003484765,0.0005268428,0.00035958661,0.000813598,0.0004893832,0.0007955529,0.000148723],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015266987,0.00076237734,0.7851031,0.0000791968,0.00042898225,0.0018310446,0.00063949055,0.14233471,0.0048337067,0.02100545,0.008793407,0.032661837],"study_design_scores_gemma":[0.000085413965,0.0001919415,0.8917585,0.000015755819,0.00011395651,0.00011356431,0.0014907169,0.097701795,0.0014661087,0.0038886436,0.0031323954,0.000041139487],"about_ca_topic_score_codex":0.110484414,"about_ca_topic_score_gemma":0.13877088,"teacher_disagreement_score":0.110484414,"about_ca_system_score_codex":0.0012064166,"about_ca_system_score_gemma":0.0004543393,"threshold_uncertainty_score":0.21968263},"labels":[],"label_agreement":null},{"id":"W4413206760","doi":"10.3390/en18164245","title":"Energy Arbitrage Analysis for Market-Selection of a Battery Energy Storage System-Based Venture","year":2025,"lang":"en","type":"article","venue":"Energies","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Arbitrage; Volatility (finance); Electricity market; Electricity; Renewable energy; Economics; Profitability index; Energy market; Business; Environmental economics; Econometrics; Finance; Engineering","score_opus":0.002899429282277446,"score_gpt":0.18233526748842174,"score_spread":0.1794358382061443,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413206760","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9812983,0.00009444885,0.014531602,0.00005442799,0.0000059101503,0.00006453038,0.00034356452,0.000037820726,0.0035692435],"genre_scores_gemma":[0.997224,0.000024485282,0.0022031176,0.0000030213253,0.000001588173,0.000015802887,0.0002503804,0.0000037236405,0.00027387156],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999041,0.00036954944,0.00006310541,0.00011666878,0.00025112435,0.00015844754],"domain_scores_gemma":[0.99685943,0.0020149953,0.0004740354,0.00013446048,0.0003921864,0.0001249046],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029956987,0.00041266612,0.00044089134,0.0023321672,0.00028977383,0.0020189707,0.00036054073,0.000387613,0.0031525746],"category_scores_gemma":[0.008601134,0.00014256229,0.0008637975,0.001483981,0.00039906375,0.0014013548,0.0007848918,0.00032822328,0.00019748721],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012888686,0.0002601148,0.33164853,0.00025175954,0.0004076189,0.001705737,0.00053409004,0.51149553,0.0059433505,0.045400534,0.0023371573,0.098726705],"study_design_scores_gemma":[0.000035825953,0.0004445427,0.091708794,0.000037057187,0.000100568126,0.00022628262,0.0009945824,0.8921067,0.0022040433,0.01053334,0.0015624432,0.00004590419],"about_ca_topic_score_codex":0.0029380848,"about_ca_topic_score_gemma":0.0025001562,"teacher_disagreement_score":0.0031525746,"about_ca_system_score_codex":0.0008773763,"about_ca_system_score_gemma":0.00065063074,"threshold_uncertainty_score":0.015842974},"labels":[],"label_agreement":null},{"id":"W4413295584","doi":"10.1016/j.enpol.2025.114821","title":"Mitigation and adaptation: Assessing the multi-value benefits of transmission expansion","year":2025,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Victoria","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Adaptation (eye); Value (mathematics); Natural resource economics; Economics; Environmental science; Environmental economics; Business; Environmental resource management; Statistics; Mathematics; Psychology","score_opus":0.010232011091203655,"score_gpt":0.25018075540340035,"score_spread":0.2399487443121967,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413295584","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88460654,0.00039315145,0.069893524,0.00090250163,0.00002570301,0.000620782,0.0004702455,0.00014051962,0.042947],"genre_scores_gemma":[0.98682773,0.00012139309,0.012036493,0.000025059935,0.000004733678,0.00006886854,0.00009121938,0.000011200551,0.000813228],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99839824,0.000883871,0.000030264311,0.00011031189,0.0003847081,0.00019265027],"domain_scores_gemma":[0.997875,0.0012388021,0.00028078025,0.000119294964,0.00036376945,0.00012243509],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031653875,0.0009799363,0.0003906791,0.0015892637,0.00050133554,0.0019288952,0.00078363775,0.0007598842,0.0017924135],"category_scores_gemma":[0.0054137153,0.00028304313,0.0007471186,0.0014238132,0.0009436512,0.0018024567,0.0012658794,0.0010141288,0.000073629315],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011858657,0.000117699296,0.018430246,0.00006454638,0.00011682913,0.00024360826,0.00015545421,0.9365614,0.0014954427,0.0134787485,0.0004047735,0.028812675],"study_design_scores_gemma":[0.000034226145,0.00046745315,0.03471585,0.00007342238,0.0001447162,0.00010070096,0.00092945324,0.9379957,0.002273165,0.020220963,0.0029757116,0.00006863477],"about_ca_topic_score_codex":0.035275307,"about_ca_topic_score_gemma":0.04879233,"teacher_disagreement_score":0.035275307,"about_ca_system_score_codex":0.0037182644,"about_ca_system_score_gemma":0.003534022,"threshold_uncertainty_score":0.070139945},"labels":[],"label_agreement":null},{"id":"W4413372123","doi":"10.33564/ijeast.2025.v10i02.006","title":"COMPARING HYDROPOWER LEADERS: ORGANIZATIONAL PRACTICES, CHALLENGES, AND OPPORTUNITIES AT BC HYDRO AND NHPC","year":2025,"lang":"en","type":"article","venue":"International Journal of Engineering Applied Sciences and Technology","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Business; Environmental planning; Environmental science; Ecology; Biology","score_opus":0.0313894289248037,"score_gpt":0.25000443764069646,"score_spread":0.21861500871589276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413372123","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98774475,0.00008999428,0.0004126827,0.0012639548,0.000021709977,0.000040137882,0.000048374266,0.0000074478385,0.010370877],"genre_scores_gemma":[0.9949071,0.00010775631,0.00025139944,0.00016027325,0.0000062210147,0.000019524961,0.00004201122,0.0000066517064,0.004499055],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99772054,0.0005712243,0.00004881774,0.00016422807,0.00066242804,0.0008327465],"domain_scores_gemma":[0.992569,0.001192555,0.0005902864,0.0001297384,0.0021683616,0.0033499089],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016890711,0.000114967355,0.00014846896,0.0012047247,0.0053984905,0.0025640922,0.00069335196,0.0005266118,0.00366519],"category_scores_gemma":[0.0047497507,0.00019572975,0.00006745882,0.001192233,0.0020326385,0.0011002744,0.0022262183,0.0009113472,0.00044399948],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051585573,0.0007479275,0.50125813,0.00020451346,0.00004419311,0.002081271,0.3102971,0.0011987223,0.0052677356,0.010722397,0.011676983,0.15598515],"study_design_scores_gemma":[0.00002938088,0.0003163581,0.2764111,0.00013000447,0.000012699707,0.000316024,0.685265,0.0012951059,0.0015978833,0.0010004076,0.03358037,0.000045646477],"about_ca_topic_score_codex":0.10363161,"about_ca_topic_score_gemma":0.30932224,"teacher_disagreement_score":0.8963684,"about_ca_system_score_codex":0.007026006,"about_ca_system_score_gemma":0.0113147525,"threshold_uncertainty_score":0.20605683},"labels":[],"label_agreement":null},{"id":"W4414485553","doi":"10.33423/jabe.v27i5.7851","title":"The Inflation Reduction Act and Its Impact on Fuel Cell Companies: A Financial and Market Analysis","year":2025,"lang":"en","type":"article","venue":"Journal of Applied Business and Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Incentive; Tax credit; Revenue; Profitability index; Carbon tax; Renewable energy; Tax revenue; Investment (military)","score_opus":0.003182877610918708,"score_gpt":0.185058308553003,"score_spread":0.1818754309420843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414485553","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90888315,0.006429549,0.00068652624,0.011707086,0.0001224901,0.000054620392,0.0017980307,0.000030925723,0.07028756],"genre_scores_gemma":[0.9950176,0.0019890547,0.00011200721,0.0004927265,0.0001343461,0.000010482007,0.0004819799,0.0000047319877,0.0017570305],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999134,0.00012261927,0.000029495606,0.000038553633,0.0004537106,0.00022157452],"domain_scores_gemma":[0.99510515,0.0018013911,0.0016751961,0.00006253059,0.001035047,0.00032069485],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001229027,0.00022739911,0.00017079378,0.001890969,0.000692321,0.002999327,0.00028534813,0.0008724158,0.0024727548],"category_scores_gemma":[0.0052610147,0.00011863787,0.00038690105,0.002306423,0.0007615337,0.0017960054,0.00056736707,0.0013318051,0.00030804073],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009249886,0.00086291134,0.6700309,0.00030202811,0.00019783917,0.0021311038,0.0011564647,0.011612998,0.0018704752,0.11386661,0.044553265,0.1524904],"study_design_scores_gemma":[0.00005830181,0.00074111484,0.9091885,0.00023218864,0.00014218783,0.00039786848,0.0036219049,0.019343492,0.0025224674,0.011907608,0.05175601,0.000088309076],"about_ca_topic_score_codex":0.02031693,"about_ca_topic_score_gemma":0.016429126,"teacher_disagreement_score":0.02031693,"about_ca_system_score_codex":0.002147134,"about_ca_system_score_gemma":0.00145339,"threshold_uncertainty_score":0.040397346},"labels":[],"label_agreement":null},{"id":"W4414793528","doi":"10.3390/en18195255","title":"Modeling the Duration of Electricity Price Spikes Using Survival Analysis","year":2025,"lang":"en","type":"article","venue":"Energies","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Duration (music); Bidding; Electricity market; Market price; Electricity price; Electricity; Spike (software development); Nonparametric statistics; Time series","score_opus":0.00933760819621247,"score_gpt":0.22460042378103998,"score_spread":0.21526281558482752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414793528","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48430157,0.00071427284,0.50851196,0.0007912971,0.00006305362,0.00011638398,0.0013996032,0.00042551075,0.0036764077],"genre_scores_gemma":[0.984544,0.0003011279,0.012049252,0.00005466585,0.000037722257,0.000099563265,0.00068794336,0.000038780603,0.0021869582],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926203,0.00022196333,0.000049939055,0.00020278915,0.00012320234,0.00014012636],"domain_scores_gemma":[0.9898651,0.007176075,0.001712046,0.0005079162,0.00049807964,0.00024070503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044302708,0.0007320505,0.0007328828,0.0014312344,0.00033440767,0.0013535107,0.0013423427,0.0014227472,0.002262203],"category_scores_gemma":[0.015386017,0.00046041142,0.0010113062,0.0015006027,0.00096350786,0.0016722583,0.0012036246,0.0015654794,0.00035206822],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015005184,0.00009152598,0.034853037,0.00010346535,0.00013910733,0.0002638877,0.00045444962,0.8896098,0.0015945632,0.051672596,0.0010725948,0.01999487],"study_design_scores_gemma":[0.0000056744084,0.000033495027,0.0036160697,0.0000113582855,0.000018251752,0.000040794304,0.00005091304,0.98389935,0.0001876103,0.011757844,0.00036222217,0.000016430095],"about_ca_topic_score_codex":0.0084216455,"about_ca_topic_score_gemma":0.005370548,"teacher_disagreement_score":0.0084216455,"about_ca_system_score_codex":0.0010672163,"about_ca_system_score_gemma":0.00070192287,"threshold_uncertainty_score":0.023429751},"labels":[],"label_agreement":null},{"id":"W4415976682","doi":"10.2139/ssrn.5708763","title":"Powering the Federation: A Blueprint for National Electricity Integration in Canada","year":2025,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Victoria","funders":"","keywords":"Blueprint; Electricity; Government (linguistics); Electricity retailing; Electric power industry","score_opus":0.004036315846897572,"score_gpt":0.20386622375374652,"score_spread":0.19982990790684896,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415976682","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06416905,0.0104099475,0.019529037,0.46229315,0.0065717883,0.0005700557,0.0023083491,0.0009285709,0.43322003],"genre_scores_gemma":[0.5276673,0.006828267,0.03160482,0.049777593,0.0005593945,0.000204172,0.0013077131,0.00043956772,0.38161123],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99554473,0.00027534226,0.00008627329,0.00026842149,0.0016607639,0.0021645038],"domain_scores_gemma":[0.99433905,0.00016146578,0.00008021039,0.00018593497,0.0025655222,0.0026677707],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036625096,0.00053421274,0.00054864737,0.0015942613,0.010556598,0.008881864,0.0019090254,0.0048793405,0.013317383],"category_scores_gemma":[0.00596266,0.0005115092,0.0008460238,0.002504043,0.0029187752,0.003649314,0.0049425797,0.005571185,0.0011079567],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000079123565,0.000119005424,0.005546144,0.00015344327,0.000046089204,0.00049380504,0.0019222571,0.004134987,0.00089779776,0.41445327,0.45984286,0.11231111],"study_design_scores_gemma":[0.000044530745,0.000041535965,0.016453844,0.00032421827,0.000025025334,0.00012139277,0.004065761,0.0028527454,0.00045877814,0.03921622,0.9363017,0.00009419331],"about_ca_topic_score_codex":0.9838171,"about_ca_topic_score_gemma":0.9926122,"teacher_disagreement_score":0.9115763,"about_ca_system_score_codex":0.08842376,"about_ca_system_score_gemma":0.39413542,"threshold_uncertainty_score":0.6415623},"labels":[],"label_agreement":null},{"id":"W4416136968","doi":"10.1109/pesgm52009.2025.11225719","title":"An Efficient Data-Driven Model for Generation Expansion Planning with Short-Term Operational Constraints","year":2025,"lang":"","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity generation; Capacity planning; Electricity; Computation; Unit (ring theory); Power system simulation; Key (lock); Renewable energy","score_opus":0.04305818984085352,"score_gpt":0.2972141560771376,"score_spread":0.25415596623628406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416136968","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03920592,0.0003135715,0.9351983,0.00088534463,0.00007317487,0.00019519366,0.0034727578,0.00082734774,0.019828405],"genre_scores_gemma":[0.8309067,0.0004333904,0.14299998,0.00019673024,0.0000498393,0.0008274039,0.0029125093,0.00025388447,0.02141957],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99962556,0.000097817094,0.000016759943,0.00008334598,0.00010678641,0.0000696245],"domain_scores_gemma":[0.999218,0.00045761312,0.00006924086,0.000032552038,0.00017957349,0.000043052572],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00078051735,0.00088281406,0.0009202329,0.0005073238,0.00061738805,0.0013278896,0.0018861603,0.0014490362,0.006038182],"category_scores_gemma":[0.0019909325,0.0009076499,0.0007802838,0.0010534609,0.00076473056,0.00109984,0.0008425825,0.0018035603,0.00078431575],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004698818,0.0000035278715,0.000060935145,0.000006537321,0.0000021103021,0.00001067816,0.0000044794383,0.9973623,0.00005116228,0.0014700433,0.00019554683,0.00082800735],"study_design_scores_gemma":[0.0000037978348,0.0000022048414,0.000029027224,0.0000015289058,0.000001376365,0.0000020579819,0.0000022808151,0.9987379,0.00003499779,0.0008898978,0.00029325543,0.0000018341675],"about_ca_topic_score_codex":0.105394885,"about_ca_topic_score_gemma":0.09780269,"teacher_disagreement_score":0.105394885,"about_ca_system_score_codex":0.0025079204,"about_ca_system_score_gemma":0.004054388,"threshold_uncertainty_score":0.20956284},"labels":[],"label_agreement":null},{"id":"W4416291530","doi":"10.29173/alr2874","title":"Alberta's Electricity Regime Overhaul: Implications of the Current and Evolving Regulatory Environment for Power Generation","year":2025,"lang":"","type":"article","venue":"Alberta Law Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"TransAlta (Canada)","funders":"","keywords":"Electricity; Electricity market; Electricity generation; Renewable energy; Investment (military); Electricity retailing; Causation; Power market; Electric power industry; Variable renewable energy","score_opus":0.009324475259230485,"score_gpt":0.2367945696111068,"score_spread":0.2274700943518763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416291530","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.066965595,0.057171438,0.0067335838,0.18134315,0.0018975772,0.000087342465,0.0007346774,0.00024475812,0.6848219],"genre_scores_gemma":[0.75100505,0.036688287,0.0036466778,0.04415375,0.0007298045,0.00004515052,0.00038936382,0.00010039411,0.16324143],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99614114,0.00038219028,0.00006767045,0.00024378412,0.0023253972,0.0008398225],"domain_scores_gemma":[0.9975464,0.0008579386,0.00013987468,0.00010849545,0.0010909114,0.00025641604],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028927163,0.00024267528,0.00027185844,0.0013130946,0.0051359306,0.006878909,0.0022548211,0.0034076062,0.0037814155],"category_scores_gemma":[0.0041316994,0.0002992127,0.0004490727,0.0020777155,0.005754086,0.0010432488,0.0010595784,0.003450243,0.00025630978],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051066512,0.000049844377,0.0027301242,0.0002056815,0.000032567415,0.0006838172,0.0009345576,0.009259191,0.0012140303,0.8169051,0.09495288,0.07298112],"study_design_scores_gemma":[0.00005228955,0.00005666576,0.025093222,0.00057805394,0.00006605141,0.0002528438,0.001537821,0.0052704965,0.0011522367,0.074636966,0.89115995,0.00014335735],"about_ca_topic_score_codex":0.93657416,"about_ca_topic_score_gemma":0.96916753,"teacher_disagreement_score":0.93647283,"about_ca_system_score_codex":0.06352718,"about_ca_system_score_gemma":0.08774639,"threshold_uncertainty_score":0.46092415},"labels":[],"label_agreement":null},{"id":"W4416595598","doi":"10.2139/ssrn.5800803","title":"Toward Zero-Shot Generalization of Deep Reinforcement Learning for Hybrid Energy System Dispatch","year":2025,"lang":"","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Reinforcement learning; Generalization; Generalization error; Normalization (sociology); Generalizability theory; Regularization (linguistics)","score_opus":0.009244271775888675,"score_gpt":0.22189743012069857,"score_spread":0.21265315834480988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416595598","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08357595,0.0004268709,0.9100928,0.00056763034,0.00009772727,0.000060745904,0.00012314455,0.00088918756,0.004166044],"genre_scores_gemma":[0.939688,0.00010036771,0.055600207,0.00024454834,0.00006207819,0.00009726395,0.00020623342,0.0001209251,0.0038803902],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965453,0.00014647977,0.000016708816,0.000074958814,0.00005365829,0.00005375227],"domain_scores_gemma":[0.9975616,0.0017833351,0.00012261896,0.00016238581,0.00023835867,0.00013178552],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018380824,0.0011081225,0.0017644848,0.0005312896,0.00042621518,0.0009592372,0.0015336849,0.0015358377,0.0032373078],"category_scores_gemma":[0.005851886,0.0007921276,0.0005973632,0.00038826535,0.0010973027,0.001451838,0.0019730106,0.002331352,0.00044208742],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000094352145,0.000066171895,0.00038073937,0.000036674934,0.00003547849,0.000026556809,0.000033862852,0.9653957,0.00046335004,0.006116501,0.0012356484,0.026114952],"study_design_scores_gemma":[0.0000026125545,0.0000061647406,0.000015722353,0.0000014867627,0.0000010378614,0.0000010976938,0.0000012784602,0.998078,0.00003175921,0.0018386396,0.000021399657,8.3852984e-7],"about_ca_topic_score_codex":0.008281782,"about_ca_topic_score_gemma":0.008289462,"teacher_disagreement_score":0.008281782,"about_ca_system_score_codex":0.0012737997,"about_ca_system_score_gemma":0.0013792904,"threshold_uncertainty_score":0.016467154},"labels":[],"label_agreement":null},{"id":"W4416595599","doi":"10.2139/ssrn.5800802","title":"Toward Zero-Shot Generalization of Deep Reinforcement Learning for Hybrid Energy System Dispatch","year":2025,"lang":"","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Reinforcement learning; Generalization; Generalization error; Normalization (sociology); Generalizability theory; Regularization (linguistics)","score_opus":0.009244271775888675,"score_gpt":0.22189743012069857,"score_spread":0.21265315834480988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416595599","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08357595,0.0004268709,0.9100928,0.00056763034,0.00009772727,0.000060745904,0.00012314455,0.00088918756,0.004166044],"genre_scores_gemma":[0.939688,0.00010036771,0.055600207,0.00024454834,0.00006207819,0.00009726395,0.00020623342,0.0001209251,0.0038803902],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965453,0.00014647977,0.000016708816,0.000074958814,0.00005365829,0.00005375227],"domain_scores_gemma":[0.9975616,0.0017833351,0.00012261896,0.00016238581,0.00023835867,0.00013178552],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018380824,0.0011081225,0.0017644848,0.0005312896,0.00042621518,0.0009592372,0.0015336849,0.0015358377,0.0032373078],"category_scores_gemma":[0.005851886,0.0007921276,0.0005973632,0.00038826535,0.0010973027,0.001451838,0.0019730106,0.002331352,0.00044208742],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000094352145,0.000066171895,0.00038073937,0.000036674934,0.00003547849,0.000026556809,0.000033862852,0.9653957,0.00046335004,0.006116501,0.0012356484,0.026114952],"study_design_scores_gemma":[0.0000026125545,0.0000061647406,0.000015722353,0.0000014867627,0.0000010378614,0.0000010976938,0.0000012784602,0.998078,0.00003175921,0.0018386396,0.000021399657,8.3852984e-7],"about_ca_topic_score_codex":0.008281782,"about_ca_topic_score_gemma":0.008289462,"teacher_disagreement_score":0.008281782,"about_ca_system_score_codex":0.0012737997,"about_ca_system_score_gemma":0.0013792904,"threshold_uncertainty_score":0.016467154},"labels":[],"label_agreement":null},{"id":"W4416632168","doi":"10.1016/j.enpol.2025.114975","title":"Wholesale price prediction: The role of information and transparency","year":2025,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Social Sciences and Humanities Research Council of Canada; Canada First Research Excellence Fund","keywords":"Transparency (behavior); Competition (biology); Limiting; Electricity market; Electricity; Argument (complex analysis); Balance (ability); Point (geometry)","score_opus":0.0013995927216985267,"score_gpt":0.16749333641100128,"score_spread":0.16609374368930274,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416632168","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73822665,0.0033265876,0.13305019,0.03959103,0.00038327865,0.00027698453,0.0012508509,0.0004736011,0.08342084],"genre_scores_gemma":[0.99658835,0.00021374373,0.002289067,0.00025716334,0.00005995766,0.000011450236,0.000064487576,0.000014979083,0.0005007195],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9855393,0.007696651,0.00092910934,0.0015666734,0.0031266874,0.0011416705],"domain_scores_gemma":[0.74249864,0.18544602,0.04828764,0.014797112,0.0073501254,0.0016204487],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017874844,0.00049417536,0.00089555414,0.0009116356,0.00124385,0.007400982,0.0015508713,0.0026790167,0.0036478753],"category_scores_gemma":[0.13241406,0.00050387444,0.0007237614,0.0014532938,0.00322306,0.010190443,0.0025533962,0.0041461294,0.0003632663],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019562014,0.0007988131,0.18405464,0.0008675001,0.0007795723,0.0014478501,0.005339128,0.24575163,0.005084943,0.39358923,0.009340119,0.15099035],"study_design_scores_gemma":[0.00038038785,0.0006890121,0.10928637,0.00066520966,0.00037602967,0.00066127663,0.0042548594,0.32758275,0.011534043,0.5245462,0.019590395,0.0004334337],"about_ca_topic_score_codex":0.008809776,"about_ca_topic_score_gemma":0.0040923934,"teacher_disagreement_score":0.017874844,"about_ca_system_score_codex":0.0025041183,"about_ca_system_score_gemma":0.0031190459,"threshold_uncertainty_score":0.09453237},"labels":[],"label_agreement":null},{"id":"W4416662195","doi":"10.2139/ssrn.5806862","title":"Toward Zero-Shot Generalization of Deep Reinforcement Learning for Hybrid Energy System Dispatch","year":2025,"lang":"","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Reinforcement learning; Generalization; Generalization error; Normalization (sociology); Generalizability theory; Regularization (linguistics)","score_opus":0.009244271775888675,"score_gpt":0.22189743012069857,"score_spread":0.21265315834480988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416662195","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08357595,0.0004268709,0.9100928,0.00056763034,0.00009772727,0.000060745904,0.00012314455,0.00088918756,0.004166044],"genre_scores_gemma":[0.939688,0.00010036771,0.055600207,0.00024454834,0.00006207819,0.00009726395,0.00020623342,0.0001209251,0.0038803902],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965453,0.00014647977,0.000016708816,0.000074958814,0.00005365829,0.00005375227],"domain_scores_gemma":[0.9975616,0.0017833351,0.00012261896,0.00016238581,0.00023835867,0.00013178552],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018380824,0.0011081225,0.0017644848,0.0005312896,0.00042621518,0.0009592372,0.0015336849,0.0015358377,0.0032373078],"category_scores_gemma":[0.005851886,0.0007921276,0.0005973632,0.00038826535,0.0010973027,0.001451838,0.0019730106,0.002331352,0.00044208742],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000094352145,0.000066171895,0.00038073937,0.000036674934,0.00003547849,0.000026556809,0.000033862852,0.9653957,0.00046335004,0.006116501,0.0012356484,0.026114952],"study_design_scores_gemma":[0.0000026125545,0.0000061647406,0.000015722353,0.0000014867627,0.0000010378614,0.0000010976938,0.0000012784602,0.998078,0.00003175921,0.0018386396,0.000021399657,8.3852984e-7],"about_ca_topic_score_codex":0.008281782,"about_ca_topic_score_gemma":0.008289462,"teacher_disagreement_score":0.008281782,"about_ca_system_score_codex":0.0012737997,"about_ca_system_score_gemma":0.0013792904,"threshold_uncertainty_score":0.016467154},"labels":[],"label_agreement":null},{"id":"W4417250209","doi":"10.1109/icpre67300.2025.11274215","title":"A Survey on Optimization, Pricing, and Market Design for Power &amp; Energy Systems under Carbon Pricing Coupling","year":2025,"lang":"","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"State Grid Shanghai Municipal Electric Power Company","keywords":"Electricity; Electricity market; Futures contract; Offset (computer science); Market clearing; Spot contract; Benchmark (surveying); Carbon price; Carbon market; Electricity generation","score_opus":0.01656011142135337,"score_gpt":0.23073883948451254,"score_spread":0.21417872806315918,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417250209","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007166793,0.7304795,0.19539762,0.002409481,0.00053515204,0.000073664116,0.00019329572,0.00017415531,0.06357035],"genre_scores_gemma":[0.092393994,0.84008545,0.05618099,0.00075472164,0.0019968036,0.0001047494,0.0002915761,0.00012748531,0.008064203],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991825,0.00027063425,0.00007321462,0.00012227955,0.00029662135,0.00005471815],"domain_scores_gemma":[0.9993594,0.0004389099,0.000052079926,0.00004028019,0.000094757845,0.000014561066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001159765,0.0012791303,0.0013550377,0.0013939084,0.000441172,0.002376686,0.0010325551,0.0012398278,0.004572562],"category_scores_gemma":[0.0020210422,0.00072544004,0.00093084585,0.004440259,0.0006735127,0.0029430687,0.0006527453,0.0012829059,0.0009314234],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006425488,0.00024354109,0.0010203109,0.006117285,0.00012268376,0.0001519419,0.00010049529,0.11430939,0.0013204396,0.24146685,0.021157345,0.61392546],"study_design_scores_gemma":[0.000043617,0.00037195673,0.002021079,0.0025572074,0.00014684002,0.00070398324,0.00025610355,0.22698197,0.0019828319,0.27560055,0.48922998,0.00010393289],"about_ca_topic_score_codex":0.0015985607,"about_ca_topic_score_gemma":0.0016687933,"teacher_disagreement_score":0.004572562,"about_ca_system_score_codex":0.0010238191,"about_ca_system_score_gemma":0.0011111012,"threshold_uncertainty_score":0.015296757},"labels":[],"label_agreement":null},{"id":"W46909155","doi":"","title":"OPTIMAL ECONOMIC AND ENVIRONMENTAL OPERATION OF ELECTRIC POWER SYSTEMS VIA MODERN META-HEURISTIC OPTIMIZATION ALGORITHMS","year":2012,"lang":"en","type":"article","venue":"Library and Archives Canada (Government of Canada)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Meta heuristic; Heuristic; Computer science; Power (physics); Mathematical optimization; Algorithm; Mathematics; Artificial intelligence","score_opus":0.002471509256770391,"score_gpt":0.12253603490391703,"score_spread":0.12006452564714663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W46909155","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04127164,0.0030417799,0.9376565,0.00068382174,0.00011600638,0.00017796813,0.00013174147,0.00028102004,0.016639443],"genre_scores_gemma":[0.6453166,0.0027184272,0.3449586,0.00024595307,0.000104450526,0.00068493246,0.0002887212,0.0001097714,0.005572581],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996995,0.00013877398,0.000016672066,0.000039544924,0.00006799676,0.00003745281],"domain_scores_gemma":[0.99945515,0.0003761522,0.000059567024,0.000023974248,0.00006764031,0.000017456],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009510715,0.0012062897,0.0010523614,0.0009586,0.0005097399,0.0016771236,0.0010072768,0.0014051087,0.0014226118],"category_scores_gemma":[0.0020085433,0.0006703521,0.0012126381,0.0010247554,0.0006516948,0.0007979787,0.00080228155,0.0010703085,0.0002458739],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008696151,0.000012573626,0.00015333919,0.000029683464,0.000022624197,0.000017701732,0.000012688798,0.989585,0.0001339737,0.0027449527,0.00018732013,0.0070915734],"study_design_scores_gemma":[0.0000053207636,0.0000089680025,0.00003380147,0.000011368621,0.000005867645,0.0000042370125,0.00000909161,0.99776196,0.00007259266,0.0017485323,0.0003362076,0.0000020001162],"about_ca_topic_score_codex":0.0062903366,"about_ca_topic_score_gemma":0.0050855665,"teacher_disagreement_score":0.0062903366,"about_ca_system_score_codex":0.0010091662,"about_ca_system_score_gemma":0.0014745846,"threshold_uncertainty_score":0.012507439},"labels":[],"label_agreement":null},{"id":"W560966115","doi":"10.1016/j.epsr.2015.05.011","title":"Sensitivity-based chance-constrained Generation Expansion Planning","year":2015,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis; University of Calgary","funders":"","keywords":"Sensitivity (control systems); Mathematical optimization; Joint (building); Exploit; Reliability (semiconductor); Computer science; Iterative method; Algorithm; Mathematics; Engineering","score_opus":0.08589703047869257,"score_gpt":0.3191983758273748,"score_spread":0.23330134534868224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W560966115","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022657521,0.00020574837,0.97159666,0.00020112585,0.00002795501,0.00006202101,0.00010376784,0.00021945017,0.004925779],"genre_scores_gemma":[0.82527304,0.00030477508,0.17098096,0.00011785398,0.000047718604,0.00022796163,0.0002482596,0.00010715808,0.0026923819],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99903095,0.0004083424,0.000036468642,0.00012982509,0.00027545326,0.00011902655],"domain_scores_gemma":[0.99742496,0.0019580203,0.00017137143,0.000071640796,0.00029703067,0.000077036944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016979801,0.0010622285,0.001236876,0.001050591,0.0004937485,0.0010702029,0.0009843666,0.000802862,0.002114856],"category_scores_gemma":[0.0047542118,0.0007954786,0.00095579977,0.0014300253,0.0009353484,0.001366103,0.0009710717,0.0009266024,0.00021086878],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011308097,0.000003829259,0.00006926176,0.000007754623,0.000007284725,0.000011782469,0.000006867137,0.9930474,0.000097905664,0.002960438,0.00014869096,0.0036274376],"study_design_scores_gemma":[0.0000024517692,0.000004816891,0.00003140055,0.0000020048196,0.0000020921834,0.0000036752906,0.0000016682457,0.9976497,0.0000964268,0.0021374794,0.00006542739,0.0000028435734],"about_ca_topic_score_codex":0.0104566505,"about_ca_topic_score_gemma":0.008161292,"teacher_disagreement_score":0.0104566505,"about_ca_system_score_codex":0.0014380176,"about_ca_system_score_gemma":0.001965272,"threshold_uncertainty_score":0.02079159},"labels":[],"label_agreement":null},{"id":"W590842113","doi":"10.1016/j.procs.2015.05.143","title":"Overload Management in Transmission System Using Particle Swarm Optimization","year":2015,"lang":"en","type":"article","venue":"Procedia Computer Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Particle swarm optimization; Mathematical optimization; Transmission (telecommunications); Algorithm; Telecommunications; Mathematics","score_opus":0.016348471620368184,"score_gpt":0.21996243611533692,"score_spread":0.20361396449496874,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W590842113","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017959906,0.00043318793,0.9789083,0.00018927846,0.000074699514,0.000042772914,0.000019556515,0.0002149932,0.002157266],"genre_scores_gemma":[0.83568114,0.0007521007,0.1591543,0.00008889053,0.00015725454,0.00014575438,0.00009221062,0.000047400456,0.0038808887],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998411,0.00005051729,0.000011655722,0.000024544439,0.000054104286,0.0000180276],"domain_scores_gemma":[0.9998776,0.000037114023,0.000027765696,0.000010592416,0.000036940502,0.000010033289],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031350195,0.00066160347,0.0007636925,0.0003755621,0.00041048875,0.0005971108,0.00046720466,0.0006516193,0.00070175395],"category_scores_gemma":[0.00042212682,0.00023235893,0.0005663189,0.00038819725,0.00025555916,0.000556333,0.00044156893,0.00056922686,0.0001237502],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039578168,0.000052476524,0.00064820354,0.000067141154,0.00006244943,0.00009895377,0.00006250449,0.9379592,0.0047109937,0.0052680685,0.0011083147,0.049922243],"study_design_scores_gemma":[0.000006090916,0.000026205586,0.00012822665,0.0000021501935,0.000008335496,0.000012387535,0.000004706439,0.998417,0.00029177946,0.0007035735,0.00039607956,0.0000034291052],"about_ca_topic_score_codex":0.0025667287,"about_ca_topic_score_gemma":0.0019073698,"teacher_disagreement_score":0.0025667287,"about_ca_system_score_codex":0.00029185828,"about_ca_system_score_gemma":0.0004218694,"threshold_uncertainty_score":0.0051036477},"labels":[],"label_agreement":null},{"id":"W609929272","doi":"10.1016/j.enpol.2015.05.024","title":"Measuring the competitiveness benefits of a transmission investment policy: The case of the Alberta electricity market","year":2015,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":65,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity market; Market power; Electricity; Investment (military); Competition (biology); Economics; Market clearing; Electricity retailing; Industrial organization; Clearing; Transmission (telecommunications); Business; Microeconomics; Finance; Telecommunications; Monopoly","score_opus":0.014706902174986847,"score_gpt":0.2102365265970255,"score_spread":0.19552962442203864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W609929272","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9680292,0.00040655737,0.002716211,0.0020335333,0.000032163956,0.000043336222,0.00018384054,0.000035049525,0.02652015],"genre_scores_gemma":[0.9973252,0.00015442364,0.00073942,0.00005770566,0.00000831397,0.000004750486,0.000058370006,0.0000058007226,0.0016460218],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9990087,0.0004103958,0.000023941884,0.000079730286,0.00019887066,0.00027833672],"domain_scores_gemma":[0.99676126,0.002077863,0.00027125695,0.00010728354,0.00053286745,0.00024940554],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027146612,0.00054256467,0.00061094423,0.0009337296,0.0013503297,0.0038975002,0.0012371672,0.0018737216,0.0029481607],"category_scores_gemma":[0.008170966,0.0002742666,0.0004746954,0.0016357484,0.0018875046,0.0021487377,0.0009052732,0.0021317403,0.00009078387],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00085038465,0.0005189751,0.04031247,0.0001546235,0.00017196429,0.0011101759,0.00033318286,0.7880665,0.002016665,0.14308748,0.0047103884,0.018667199],"study_design_scores_gemma":[0.0003630961,0.00051280484,0.075430706,0.00007116983,0.00032887544,0.00011129962,0.004974294,0.8574298,0.0032490601,0.049464475,0.007909294,0.00015515106],"about_ca_topic_score_codex":0.653817,"about_ca_topic_score_gemma":0.7440697,"teacher_disagreement_score":0.346183,"about_ca_system_score_codex":0.017166972,"about_ca_system_score_gemma":0.01056979,"threshold_uncertainty_score":0.69644344},"labels":[],"label_agreement":null},{"id":"W63506963","doi":"","title":"Generation Capacity Expansion Planning in Deregulated Electricity Markets","year":2009,"lang":"en","type":"article","venue":"UWSpace (University of Waterloo)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Waterloo; Mitacs","keywords":"Electricity; Business; Electricity market; Electricity generation; Electricity retailing; Natural resource economics; Industrial organization; Economics; Engineering; Electrical engineering; Power (physics)","score_opus":0.012700343861463508,"score_gpt":0.17739012832534495,"score_spread":0.16468978446388144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W63506963","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20938806,0.0017856032,0.73132354,0.0012403335,0.00009604771,0.00021356011,0.00037308325,0.0002262148,0.055353552],"genre_scores_gemma":[0.95872927,0.0009907896,0.032204423,0.00007276826,0.000018804176,0.000091438946,0.00009650201,0.00004856314,0.0077472916],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99939525,0.00031173148,0.000012669123,0.000102181664,0.00007692032,0.00010128221],"domain_scores_gemma":[0.99933845,0.0004165373,0.0000970941,0.00002347697,0.000071858776,0.000052643347],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015718297,0.00076599786,0.00091634033,0.0005606378,0.00044270567,0.002235901,0.0011136348,0.0012046966,0.0028909044],"category_scores_gemma":[0.0021580975,0.0008707618,0.0006187302,0.000736418,0.0012001666,0.0020182715,0.00075832166,0.001437459,0.00021879002],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007914256,0.000006989577,0.000047155874,0.000007847927,0.0000039133406,0.00002555991,0.000013346872,0.98391587,0.0001211052,0.014659357,0.00011372637,0.0010772343],"study_design_scores_gemma":[0.0000037209575,0.0000091909105,0.00003763457,0.000004869882,0.0000021992669,0.0000046109585,0.000016197297,0.9939381,0.0000872848,0.0055850814,0.00030735237,0.0000038061294],"about_ca_topic_score_codex":0.010753266,"about_ca_topic_score_gemma":0.01092946,"teacher_disagreement_score":0.010753266,"about_ca_system_score_codex":0.0029858055,"about_ca_system_score_gemma":0.0017120691,"threshold_uncertainty_score":0.021663606},"labels":[],"label_agreement":null},{"id":"W643821914","doi":"","title":"Modelling prices in competitive electricity markets","year":2004,"lang":"en","type":"book","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":219,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity market; Bidding; Economics; Spot contract; Autoregressive integrated moving average; Market clearing; Electricity; Economy; Financial economics; Futures contract; Microeconomics; Computer science; Time series; Engineering","score_opus":0.006381468224098542,"score_gpt":0.17700137562182236,"score_spread":0.1706199073977238,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W643821914","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02171622,0.011826936,0.70664716,0.007823064,0.0031138272,0.00030717542,0.0028333284,0.0008669534,0.24486537],"genre_scores_gemma":[0.49485624,0.020093625,0.19641776,0.00096289156,0.002856667,0.0010147803,0.0038005386,0.00062241626,0.2793752],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997036,0.00011280107,0.0000145718595,0.00004751365,0.00009952666,0.000022054406],"domain_scores_gemma":[0.99951935,0.0002782889,0.000035335717,0.000031735963,0.00010633739,0.000028942695],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006600762,0.0007440527,0.00048074746,0.0006959298,0.00047568855,0.0015192376,0.00083285006,0.0009937173,0.030884916],"category_scores_gemma":[0.002959201,0.00041082603,0.0006052563,0.0012294732,0.0004404236,0.00191647,0.0006979446,0.0010311194,0.0050938535],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022423272,0.000046284003,0.00082745496,0.0001815408,0.000029413284,0.0001793281,0.00018808324,0.22052032,0.00060060376,0.65173703,0.069599405,0.056068037],"study_design_scores_gemma":[0.000019482855,0.00003645991,0.0004471388,0.00010525023,0.0000135130485,0.00008930248,0.00009782876,0.40872404,0.0002139513,0.5112326,0.078995414,0.000025092942],"about_ca_topic_score_codex":0.0027136947,"about_ca_topic_score_gemma":0.0021858644,"teacher_disagreement_score":0.030884916,"about_ca_system_score_codex":0.00073400605,"about_ca_system_score_gemma":0.00066808733,"threshold_uncertainty_score":0.10332036},"labels":[],"label_agreement":null},{"id":"W6889004197","doi":"10.25318/2710001301-eng","title":"Federal extramural expenditures on science and technology, type of science, performing sector, type of payment and geography","year":2019,"lang":"en","type":"dataset","venue":"Statistics Canada Dissemination","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Payment; Type (biology); Government (linguistics)","score_opus":0.006669629416961716,"score_gpt":0.24780611169025843,"score_spread":0.2411364822732967,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6889004197","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":"incentives","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":"incentives","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00008787204,0.000048627753,0.000012505361,0.000042396452,0.000010320028,0.0000041724247,0.9993082,0.00003209173,0.00045377412],"genre_scores_gemma":[0.0009317365,0.00015519022,0.00009027121,0.000042952965,0.000008149203,0.000036727357,0.99731606,0.00001845169,0.001400414],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99858737,0.00009973308,0.00019841708,0.00024866627,0.00057392154,0.00029194198],"domain_scores_gemma":[0.9948072,0.000746846,0.0006618036,0.00040400535,0.003005983,0.00037407276],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.00077194173,0.0016024718,0.0014327904,0.0059359516,0.000889167,0.0018861109,0.0021932349,0.0012305551,0.03660694],"category_scores_gemma":[0.0084354505,0.00076272624,0.0011287852,0.020876193,0.00039846217,0.0008573144,0.0010779558,0.0017984948,0.020676643],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041448726,0.00000920559,0.0017770302,0.00040065515,0.000029792396,0.000010730091,0.000008951469,0.0002569055,0.000019358975,0.00041882216,0.9957041,0.0013230979],"study_design_scores_gemma":[0.00024639955,0.00001130603,0.030690223,0.00046519813,0.00006466242,0.00004313653,0.00009678923,0.0004689082,0.00023002275,0.0005463515,0.96710455,0.00003241947],"about_ca_topic_score_codex":0.79239595,"about_ca_topic_score_gemma":0.83876216,"teacher_disagreement_score":0.99922806,"about_ca_system_score_codex":0.009050841,"about_ca_system_score_gemma":0.01730611,"threshold_uncertainty_score":0.41765332},"labels":[],"label_agreement":null},{"id":"W6901821583","doi":"10.60692/yqspp-ncr74","title":"Hydropower Scheduling in Large Scale Power Systems","year":2012,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Hydroelectricity; Electric power system; Renewable energy; Hydro power; Scheduling (production processes); Scale (ratio); Electric power","score_opus":0.010077095994036498,"score_gpt":0.18465861005268777,"score_spread":0.17458151405865127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6901821583","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30513707,0.0042658,0.6476665,0.0024225886,0.00052198453,0.00038536507,0.0009980265,0.00096002524,0.03764261],"genre_scores_gemma":[0.97230804,0.00063858705,0.022013519,0.000065153894,0.0001186901,0.00006424712,0.00019215634,0.00007798041,0.004521578],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994987,0.00022772564,0.00002252311,0.00010536893,0.00007580751,0.00006989652],"domain_scores_gemma":[0.9985324,0.0009771456,0.0001576645,0.00006685007,0.000121818346,0.00014408761],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012029136,0.0005104761,0.00072065194,0.0003630892,0.0006769052,0.001502757,0.00064563507,0.0005349837,0.0049668574],"category_scores_gemma":[0.0034912224,0.000442953,0.00027383288,0.0009270214,0.0005949317,0.0013334671,0.00060335133,0.000625274,0.00034225086],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006110814,0.000036481677,0.0009360448,0.00007438033,0.000031665983,0.00014586926,0.000038605827,0.965208,0.0004473262,0.014218852,0.0026482383,0.01615351],"study_design_scores_gemma":[0.000024722372,0.000036107765,0.0005946379,0.000008075316,0.000008512559,0.000035317207,0.00006583095,0.9732861,0.00015262209,0.023929894,0.001851855,0.0000063398757],"about_ca_topic_score_codex":0.010546657,"about_ca_topic_score_gemma":0.012496806,"teacher_disagreement_score":0.010546657,"about_ca_system_score_codex":0.0012031221,"about_ca_system_score_gemma":0.0011028155,"threshold_uncertainty_score":0.020970523},"labels":[],"label_agreement":null},{"id":"W6920701519","doi":"10.60692/y9246-ddb81","title":"An Adjustable Robust Economic Energy and Reserve Dispatch Problem Incorporating Large-Scale Wind Farms","year":2022,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Vine copula; Wind power; Economic dispatch; Copula (linguistics); Electric power system; Scheduling (production processes)","score_opus":0.010277286494499108,"score_gpt":0.16751840245251157,"score_spread":0.15724111595801246,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6920701519","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.070514254,0.000104008235,0.9235067,0.0002904295,0.000025920579,0.000055177075,0.00016231339,0.000092631846,0.0052486826],"genre_scores_gemma":[0.966065,0.00008681952,0.031566203,0.000028052436,0.000017367363,0.00006748453,0.00010792618,0.00003339331,0.0020277558],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940956,0.00024491965,0.000024548823,0.000143457,0.000095228985,0.0000822822],"domain_scores_gemma":[0.99892956,0.0006649305,0.00018958138,0.00006392221,0.000094619856,0.00005726912],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012643117,0.0009165267,0.00095098634,0.00038399416,0.00031749185,0.0010725157,0.0011249653,0.00092451146,0.0016519671],"category_scores_gemma":[0.002604935,0.0005798192,0.00063084293,0.0005970075,0.00069989485,0.0010713347,0.0009309496,0.0012468179,0.00012751443],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018855972,0.000010728021,0.000120884564,0.000011364542,0.000012471168,0.000040436113,0.000006518096,0.9906166,0.00025951886,0.0064319256,0.00013774584,0.0023329505],"study_design_scores_gemma":[0.0000033752483,0.0000064256164,0.000046700945,6.325269e-7,0.0000013466884,0.000003139657,0.0000023132372,0.9985623,0.000063768,0.001265043,0.000043304077,0.0000016781863],"about_ca_topic_score_codex":0.0047028186,"about_ca_topic_score_gemma":0.0031734414,"teacher_disagreement_score":0.0047028186,"about_ca_system_score_codex":0.00092685054,"about_ca_system_score_gemma":0.00092512526,"threshold_uncertainty_score":0.009350896},"labels":[],"label_agreement":null},{"id":"W6927084908","doi":"10.25620/e211215","title":"Discriminating Data","year":2021,"lang":"en","type":"other","venue":"ICI Berlin","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Vision; Politics; Identity politics; Order (exchange); Identity (music); Big data; Data collection","score_opus":0.029611821726079065,"score_gpt":0.2550149071024583,"score_spread":0.2254030853763792,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6927084908","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005743843,0.0061950125,0.4231415,0.052415166,0.007815647,0.00061368005,0.04053185,0.008827178,0.4547162],"genre_scores_gemma":[0.22109488,0.012298801,0.3498615,0.042876646,0.007004996,0.002225206,0.10736346,0.011459513,0.24581498],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9843404,0.005966609,0.0012939747,0.002731374,0.0049369675,0.0007307503],"domain_scores_gemma":[0.9594835,0.018809013,0.0014308869,0.01447611,0.0048550274,0.0009453893],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014216498,0.0010389403,0.0010491587,0.004313156,0.0024162694,0.012317883,0.0031513344,0.0029404254,0.09296719],"category_scores_gemma":[0.0733877,0.00083829684,0.0013451191,0.0076263975,0.0033979104,0.01609505,0.008644807,0.004479634,0.04359046],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016621966,0.0000481366,0.0021408598,0.0004004246,0.000053495904,0.00012882693,0.0007309618,0.0010726453,0.00038847994,0.3700539,0.3634242,0.26139188],"study_design_scores_gemma":[0.000017112374,0.000015316817,0.00041551614,0.00025419318,0.000010211553,0.0001786374,0.00034182603,0.0017224406,0.0006868742,0.13173081,0.86459655,0.00003054287],"about_ca_topic_score_codex":0.0025313136,"about_ca_topic_score_gemma":0.0026715812,"teacher_disagreement_score":0.09296719,"about_ca_system_score_codex":0.002298861,"about_ca_system_score_gemma":0.0032214567,"threshold_uncertainty_score":0.3110062},"labels":[],"label_agreement":null},{"id":"W6930985334","doi":"10.5281/zenodo.3957204","title":"healpy/healpy: 1.14.0","year":2020,"lang":"en","type":"other","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Perimeter Institute","funders":"","keywords":"Pixel; Smoothing; Datapath; Convolution (computer science); Line (geometry)","score_opus":0.017773233302868757,"score_gpt":0.2062655837483082,"score_spread":0.18849235044543944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6930985334","genre_codex":"software","genre_gemma":"software","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"software","genre_consensus":"software","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00082404807,0.0007678684,0.043062463,0.001116723,0.0010939254,0.00019301144,0.12967408,0.7435197,0.07974826],"genre_scores_gemma":[0.0049892683,0.0009000498,0.030379448,0.0014957966,0.00037178892,0.0006674943,0.16915724,0.6870391,0.10499997],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99856526,0.00012442593,0.000068098554,0.00030395886,0.00067105767,0.0002673104],"domain_scores_gemma":[0.9968177,0.00034482847,0.00013244835,0.0007743233,0.0015269149,0.00040362254],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0024316472,0.0031342458,0.0020374893,0.002809675,0.0020364278,0.007115821,0.0064465753,0.003030362,0.51233274],"category_scores_gemma":[0.008133863,0.003513446,0.0027791548,0.0027636925,0.0010279842,0.006225102,0.0065514473,0.0044172686,0.6996873],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007408698,0.000010520362,0.00017563609,0.0002157789,0.000017280126,0.000025884765,0.00007800816,0.00021484501,0.00093084614,0.000987025,0.98445547,0.01281464],"study_design_scores_gemma":[0.00006453504,0.000017048562,0.00067544833,0.00012050938,0.000021231002,0.000092631024,0.000058875372,0.00096464757,0.0035741301,0.0030806228,0.9912493,0.00008112854],"about_ca_topic_score_codex":0.0073047723,"about_ca_topic_score_gemma":0.0075578596,"teacher_disagreement_score":0.51233274,"about_ca_system_score_codex":0.0015674663,"about_ca_system_score_gemma":0.002282524,"threshold_uncertainty_score":0.6955981},"labels":[],"label_agreement":null},{"id":"W6937178343","doi":"10.59254/sbpo-2022-157344","title":"Virtual Transactions in Electricity Markets: An Instrument for a Reliable Energy Transition Towards a Low-Carbon Operation","year":2022,"lang":"en","type":"article","venue":"Anais do Simpósio Brasileiro de Pesquisa Operacional","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Invenia (Canada)","funders":"","keywords":"Electricity; Energy (signal processing); Reliability (semiconductor); Energy transition; Electric energy; Electricity system; Mains electricity; Database transaction; Efficient energy use","score_opus":0.00792740898219144,"score_gpt":0.21671767991391735,"score_spread":0.20879027093172592,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6937178343","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44315398,0.0016205482,0.32397673,0.0128024025,0.0012686314,0.00017150861,0.00046975614,0.000949059,0.21558747],"genre_scores_gemma":[0.9831103,0.00016629037,0.011278112,0.00013403669,0.000106637664,0.000029242943,0.000045474393,0.000045857552,0.005084122],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99870074,0.0006137265,0.000049347782,0.00015347522,0.0003797471,0.00010302484],"domain_scores_gemma":[0.99453765,0.0023921938,0.00077684096,0.0008439801,0.00079183874,0.00065748487],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022202781,0.00033934708,0.0003467835,0.0005765911,0.0010198258,0.0059317863,0.001084233,0.0013552686,0.013827125],"category_scores_gemma":[0.010579838,0.0002145792,0.00027569043,0.00075409305,0.0024044742,0.007980185,0.0020306874,0.0015585175,0.0008418595],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046889068,0.0001472158,0.0039823074,0.000104411345,0.000033130298,0.0003723741,0.0004219821,0.03105992,0.002371413,0.8822321,0.0067293053,0.07207686],"study_design_scores_gemma":[0.00010360939,0.0002552153,0.0031097848,0.000119422104,0.00003482581,0.00037773492,0.000940387,0.17687732,0.0027885824,0.77779603,0.03753834,0.000058721304],"about_ca_topic_score_codex":0.0010044699,"about_ca_topic_score_gemma":0.0011098514,"teacher_disagreement_score":0.013827125,"about_ca_system_score_codex":0.00085450435,"about_ca_system_score_gemma":0.0014401184,"threshold_uncertainty_score":0.046256304},"labels":[],"label_agreement":null},{"id":"W6946142358","doi":"10.26108/mtyr-be70","title":"A Comparison of Electricity Industry Deregulation in Alberta and Texas","year":2004,"lang":"en","type":"article","venue":"AcadiaU-DEV","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Deregulation; Electricity market; Electric power industry; CLARITY; Electricity; Legislation; Government (linguistics); Order (exchange)","score_opus":0.01072628645656234,"score_gpt":0.2510214454872543,"score_spread":0.24029515903069196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6946142358","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90571177,0.00090974,0.002392995,0.00040828736,0.00002918835,0.00005640524,0.00066742935,0.00008929309,0.08973499],"genre_scores_gemma":[0.9812548,0.0007369355,0.00087548734,0.00008500291,0.000006147363,0.000011536401,0.0009486062,0.000018044997,0.016063295],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9991775,0.000073091054,0.000018157054,0.000056846227,0.00040424947,0.00027018596],"domain_scores_gemma":[0.9992131,0.00009779706,0.00008656766,0.00003290696,0.00051124557,0.000058285015],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005694993,0.00023074311,0.00018609087,0.0015565627,0.00084939535,0.0018273636,0.0007774771,0.00025416416,0.0025713008],"category_scores_gemma":[0.0011022682,0.00014874456,0.00033990302,0.0031144489,0.00064360374,0.0004474532,0.00056404696,0.00032901842,0.00017486334],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002179079,0.0003606502,0.30440268,0.00038187735,0.00027667155,0.0022006207,0.0031308043,0.31863767,0.019775983,0.123532034,0.010080328,0.21504171],"study_design_scores_gemma":[0.00016499982,0.00067759433,0.82310414,0.00010355316,0.00016016752,0.00046300946,0.009340725,0.05415613,0.0147227915,0.0046760784,0.09232627,0.00010458142],"about_ca_topic_score_codex":0.7828331,"about_ca_topic_score_gemma":0.8867203,"teacher_disagreement_score":0.2171669,"about_ca_system_score_codex":0.021170855,"about_ca_system_score_gemma":0.012774423,"threshold_uncertainty_score":0.43689167},"labels":[],"label_agreement":null},{"id":"W6958169949","doi":"10.60692/rbk8q-4br13","title":"Hydropower Scheduling in Large Scale Power Systems","year":2012,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Hydroelectricity; Electric power system; Renewable energy; Hydro power; Scheduling (production processes); Scale (ratio); Electric power","score_opus":0.010077095994036498,"score_gpt":0.18465861005268777,"score_spread":0.17458151405865127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6958169949","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30513707,0.0042658,0.6476665,0.0024225886,0.00052198453,0.00038536507,0.0009980265,0.00096002524,0.03764261],"genre_scores_gemma":[0.97230804,0.00063858705,0.022013519,0.000065153894,0.0001186901,0.00006424712,0.00019215634,0.00007798041,0.004521578],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994987,0.00022772564,0.00002252311,0.00010536893,0.00007580751,0.00006989652],"domain_scores_gemma":[0.9985324,0.0009771456,0.0001576645,0.00006685007,0.000121818346,0.00014408761],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012029136,0.0005104761,0.00072065194,0.0003630892,0.0006769052,0.001502757,0.00064563507,0.0005349837,0.0049668574],"category_scores_gemma":[0.0034912224,0.000442953,0.00027383288,0.0009270214,0.0005949317,0.0013334671,0.00060335133,0.000625274,0.00034225086],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006110814,0.000036481677,0.0009360448,0.00007438033,0.000031665983,0.00014586926,0.000038605827,0.965208,0.0004473262,0.014218852,0.0026482383,0.01615351],"study_design_scores_gemma":[0.000024722372,0.000036107765,0.0005946379,0.000008075316,0.000008512559,0.000035317207,0.00006583095,0.9732861,0.00015262209,0.023929894,0.001851855,0.0000063398757],"about_ca_topic_score_codex":0.010546657,"about_ca_topic_score_gemma":0.012496806,"teacher_disagreement_score":0.010546657,"about_ca_system_score_codex":0.0012031221,"about_ca_system_score_gemma":0.0011028155,"threshold_uncertainty_score":0.020970523},"labels":[],"label_agreement":null},{"id":"W6958557702","doi":"10.6084/m9.figshare.26531105.v1","title":"Additional file 2 of The landscape of Medicare policies for gender-affirming surgeries in Canada: an environmental scan","year":2024,"lang":"en","type":"article","venue":"Figshare","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Wilfrid Laurier University; Toronto Western Hospital; University of Toronto; Toronto General Hospital; University of Saskatchewan; Women's College Hospital","funders":"","keywords":"Government (linguistics); Key (lock); Payment; Work (physics)","score_opus":0.011268470083890782,"score_gpt":0.1805937670117433,"score_spread":0.1693252969278525,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6958557702","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00035623304,0.000022729582,0.0000531674,0.00015165814,0.000009049363,0.000031057967,0.9951185,0.000057701054,0.004199984],"genre_scores_gemma":[0.026865898,0.0004190369,0.0022741656,0.00068265,0.000050070164,0.0005716341,0.9430585,0.00045170457,0.02562635],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.99920887,0.00006513593,0.00007402325,0.00010379034,0.00033185427,0.00021643341],"domain_scores_gemma":[0.9866412,0.004544632,0.00069739466,0.00041893253,0.0070131235,0.00068480126],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0006791788,0.0005635757,0.00067313504,0.0035693776,0.0015565375,0.0016711528,0.0013123602,0.00070288876,0.6357107],"category_scores_gemma":[0.014631686,0.00037108373,0.0007124338,0.01104043,0.00033478186,0.00093463843,0.0011137165,0.0008323463,0.03289959],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036207017,0.000019654366,0.0045233793,0.0003869003,0.000017403407,0.000031113672,0.00006686746,0.00041583288,0.0000131963625,0.00086014665,0.98945564,0.004173758],"study_design_scores_gemma":[0.00064771454,0.000039792787,0.12388194,0.0027115396,0.000106120984,0.00021067233,0.0017669668,0.0022872945,0.00024812098,0.005124692,0.86286294,0.000112226415],"about_ca_topic_score_codex":0.90622455,"about_ca_topic_score_gemma":0.949378,"teacher_disagreement_score":0.99054873,"about_ca_system_score_codex":0.009451246,"about_ca_system_score_gemma":0.022716498,"threshold_uncertainty_score":0.51961446},"labels":[],"label_agreement":null},{"id":"W6959185636","doi":"10.6084/m9.figshare.c.7507908","title":"Controlled human exposures: a review and comparison of the health effects of diesel exhaust and wood smoke","year":2024,"lang":"en","type":"other","venue":"Figshare","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Particulates; Air pollution; Diesel exhaust; Smoke; Human health; Diesel fuel; Air pollutants","score_opus":0.019360470621989787,"score_gpt":0.28236309748899835,"score_spread":0.26300262686700854,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6959185636","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00021149649,0.9993486,0.00006877119,0.000046217574,0.000065223176,0.00003210374,0.00007281559,0.000002289279,0.00015253683],"genre_scores_gemma":[0.002252407,0.99718946,0.00015336141,0.00013999357,0.00006846193,0.00005982334,0.000079279656,0.000002194533,0.000055124823],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.9959859,0.0011121281,0.0015159931,0.00044010673,0.00085861795,0.00008722207],"domain_scores_gemma":[0.9799793,0.01631306,0.0019224287,0.0002866136,0.0013765681,0.00012204809],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052186726,0.0012397664,0.005445193,0.0067411573,0.00036374436,0.0018886386,0.0016170563,0.0016311799,0.0041513443],"category_scores_gemma":[0.01381336,0.000647589,0.004386181,0.006291312,0.0008022835,0.001483476,0.0010699532,0.0010250205,0.00047553575],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032382988,0.000078440564,0.0004832539,0.8153333,0.0030912326,0.00013147401,0.00017244281,0.00017184163,0.00056292815,0.0006890996,0.002386565,0.17657554],"study_design_scores_gemma":[0.00023790608,0.0012495791,0.008584572,0.6773861,0.036864374,0.0014461619,0.0004627566,0.00017870723,0.0013657402,0.0016569468,0.27045026,0.00011684206],"about_ca_topic_score_codex":0.0023531904,"about_ca_topic_score_gemma":0.0036309047,"teacher_disagreement_score":0.0067411573,"about_ca_system_score_codex":0.0009782247,"about_ca_system_score_gemma":0.0037110858,"threshold_uncertainty_score":0.027599275},"labels":[],"label_agreement":null},{"id":"W6966642532","doi":"10.4224/23002873","title":"Evaluation of thermal and moisture response of highly insulated wood-frame wall assemblies: Part I: experimental trials in the field exposure of walls test facility","year":2016,"lang":"en","type":"report","venue":"NPARC","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Thermal; Field (mathematics); Moisture; Test (biology); Test method; Mockup","score_opus":0.0467675011065975,"score_gpt":0.3111925990817375,"score_spread":0.26442509797514,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6966642532","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9972373,0.00003706152,0.0021318067,0.000007672272,0.0000106516,0.000024184956,0.000077476856,0.00004818342,0.00042559658],"genre_scores_gemma":[0.99737644,0.000031426905,0.001283817,0.0000089649475,0.0000048073666,0.000024475343,0.00012959167,0.00002723073,0.0011132751],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99974734,0.000051455452,0.000011723789,0.00006107952,0.00007436146,0.00005405631],"domain_scores_gemma":[0.99933916,0.00016703234,0.00010202607,0.00010016546,0.00019582272,0.00009584097],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003521803,0.00064716843,0.00046803083,0.00025603035,0.0004668423,0.00022961723,0.0005271379,0.0004728136,0.0020628446],"category_scores_gemma":[0.0006977365,0.00020379583,0.00033929435,0.0001967966,0.00031819363,0.00040094272,0.00031792678,0.00042891747,0.00035557707],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0025099989,0.0006184149,0.003325056,0.000091969414,0.000023251647,0.00012206391,0.0002063644,0.0045290138,0.98016423,0.00006954827,0.00019741256,0.008142676],"study_design_scores_gemma":[0.00010062857,0.010957298,0.018380573,0.000009851848,0.000046817295,0.00009347922,0.00020484987,0.004795207,0.9646204,0.000042015214,0.0007312445,0.000017672734],"about_ca_topic_score_codex":0.0006872516,"about_ca_topic_score_gemma":0.0010848023,"teacher_disagreement_score":0.0020628446,"about_ca_system_score_codex":0.00024883862,"about_ca_system_score_gemma":0.00019621893,"threshold_uncertainty_score":0.006900966},"labels":[],"label_agreement":null},{"id":"W6969077240","doi":"10.5281/zenodo.7949371","title":"Evolutionarily distinct species have fewer interactions in frugivore networks","year":2023,"lang":"en","type":"other","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Frugivore; Foraging; Nestedness; Code (set theory); Biodiversity","score_opus":0.022793418754847104,"score_gpt":0.22425649775500808,"score_spread":0.20146307900016097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6969077240","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08903091,0.00059400155,0.2001162,0.0024093066,0.0017734898,0.00032555647,0.53977627,0.036429457,0.12954473],"genre_scores_gemma":[0.34779194,0.0008616161,0.18394253,0.001225704,0.00031049375,0.0017379414,0.34496865,0.02727277,0.09188841],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9997769,0.000031916832,0.000014947923,0.00006279169,0.00007563231,0.00003785211],"domain_scores_gemma":[0.99834263,0.0008498557,0.00013584307,0.0001736237,0.00039065073,0.000107480184],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035381585,0.0006307518,0.00051931746,0.0013825103,0.0006290924,0.0011235772,0.0010423046,0.000699017,0.19952938],"category_scores_gemma":[0.004411975,0.00033431937,0.00084963616,0.0014492521,0.00032064322,0.00097549125,0.00063776446,0.0006737785,0.032237377],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034433635,0.00013026471,0.010619479,0.0012417518,0.00015845922,0.000263355,0.0003658626,0.09209498,0.011059178,0.052229676,0.77842224,0.053070366],"study_design_scores_gemma":[0.0006520038,0.00010930292,0.038469926,0.00033584292,0.00013055198,0.00048341273,0.00029440556,0.56943464,0.009486654,0.121555686,0.2589161,0.00013142794],"about_ca_topic_score_codex":0.011803961,"about_ca_topic_score_gemma":0.013725702,"teacher_disagreement_score":0.19952938,"about_ca_system_score_codex":0.0007318925,"about_ca_system_score_gemma":0.00097373064,"threshold_uncertainty_score":0.6674923},"labels":[],"label_agreement":null},{"id":"W6979698751","doi":"","title":"ABB wins $35MM electric transmission upgrade in Canada","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Upgrade; Transmission (telecommunications); Siemens; Electric power transmission; Work (physics)","score_opus":0.0018568489375501876,"score_gpt":0.14580584395930357,"score_spread":0.14394899502175337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6979698751","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0027153636,0.0006332974,0.0022106844,0.0041419435,0.002153508,0.00008629447,0.0032903561,0.0017980546,0.98297036],"genre_scores_gemma":[0.008943631,0.0003457069,0.00077246554,0.00036172327,0.00010726683,0.000009010441,0.0012568954,0.00037373736,0.98782957],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989519,0.000028073246,0.000009324667,0.0000590665,0.0007070478,0.0002446798],"domain_scores_gemma":[0.998895,0.000049365008,0.00001548136,0.000056155746,0.0006637399,0.00032025966],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00082017086,0.0010582882,0.0004204712,0.0014240491,0.0027925514,0.0033570905,0.0008273417,0.0017418873,0.31355527],"category_scores_gemma":[0.0016077284,0.00042160967,0.00063881965,0.00095770124,0.0007495704,0.0010543007,0.001231996,0.0017124466,0.084208675],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055565753,0.00003543607,0.00046985727,0.000024728222,0.00000510433,0.0000836344,0.000020566134,0.0006961612,0.000425472,0.00712233,0.94995886,0.041102216],"study_design_scores_gemma":[0.0000136561375,0.000016415457,0.0018572056,0.000026925494,0.000004297004,0.00004059352,0.00006236422,0.0010733316,0.00048415238,0.0013971048,0.9950126,0.000011360628],"about_ca_topic_score_codex":0.7324216,"about_ca_topic_score_gemma":0.88758254,"teacher_disagreement_score":0.31355527,"about_ca_system_score_codex":0.011595515,"about_ca_system_score_gemma":0.01905494,"threshold_uncertainty_score":0.9791301},"labels":[],"label_agreement":null},{"id":"W6979850435","doi":"","title":"AltaLink Receives Regulatory Approval to Enable Alberta Wind Power","year":2011,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Power (physics); Government (linguistics); Boom","score_opus":0.005230592427582299,"score_gpt":0.17251052654124324,"score_spread":0.16727993411366093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6979850435","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023010564,0.0003542751,0.0031254294,0.0021140375,0.0006798781,0.00013746913,0.0037843026,0.0019740723,0.9855295],"genre_scores_gemma":[0.011029198,0.00016410026,0.0016180547,0.00047569358,0.00006568046,0.000029481242,0.002515391,0.00043485666,0.9836675],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.998195,0.00009884754,0.000020635052,0.00010485252,0.0013145477,0.00026621373],"domain_scores_gemma":[0.99688125,0.00029753766,0.00008018067,0.00023497356,0.002020325,0.00048573426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014845252,0.00090716407,0.00052076735,0.0014275787,0.0021860516,0.0030280205,0.0013307096,0.0024278099,0.2563649],"category_scores_gemma":[0.0030346108,0.00046240122,0.00052474916,0.00093026244,0.0009453574,0.0008968449,0.0010356179,0.0025763614,0.088241704],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033225247,0.00014507625,0.0013148254,0.00010995289,0.000016861291,0.00023894313,0.00006455043,0.00197483,0.0017867306,0.022158882,0.87749684,0.09436033],"study_design_scores_gemma":[0.00008347079,0.000061465966,0.0025970098,0.000053713517,0.000009360904,0.00008747831,0.00006925082,0.002695393,0.0014479626,0.0022792807,0.9905978,0.00001779626],"about_ca_topic_score_codex":0.2226731,"about_ca_topic_score_gemma":0.47072607,"teacher_disagreement_score":0.7773269,"about_ca_system_score_codex":0.0043047844,"about_ca_system_score_gemma":0.015342971,"threshold_uncertainty_score":0.8576261},"labels":[],"label_agreement":null},{"id":"W6980409001","doi":"","title":"Canadian, Australian funds invest in Finland power grid","year":2013,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power grid; Power (physics); Government (linguistics); Investment (military); Work (physics)","score_opus":0.004842207085620813,"score_gpt":0.17378099931208948,"score_spread":0.16893879222646868,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6980409001","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028292986,0.0011354216,0.0011576159,0.0075346613,0.0011809764,0.000050113966,0.009548674,0.0006463282,0.9759169],"genre_scores_gemma":[0.011522907,0.00056837965,0.000810007,0.0003663238,0.00008116339,0.000011044385,0.0023122975,0.00017304588,0.98415494],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988249,0.00004998724,0.000024087381,0.000095331874,0.00073416525,0.00027157553],"domain_scores_gemma":[0.99746394,0.00017895047,0.000077609984,0.00013425274,0.0015878237,0.00055740704],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011347969,0.00066640787,0.0003870171,0.001810666,0.0024447027,0.0040986813,0.0007309473,0.0021541489,0.22743155],"category_scores_gemma":[0.004349682,0.00036136262,0.00045608456,0.002587482,0.0005069074,0.0018702005,0.0009895264,0.0016014781,0.034739133],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000082316335,0.00004501041,0.00071505876,0.00006317898,0.000010204159,0.00007931898,0.000068437446,0.0007413022,0.00014766665,0.029549448,0.9165939,0.051904175],"study_design_scores_gemma":[0.000021678497,0.0000135276205,0.0020802803,0.00004536956,0.000008129708,0.000050231592,0.000113152884,0.00092992035,0.00036041354,0.0031506403,0.9932181,0.000008491478],"about_ca_topic_score_codex":0.365628,"about_ca_topic_score_gemma":0.5493999,"teacher_disagreement_score":0.634372,"about_ca_system_score_codex":0.010042873,"about_ca_system_score_gemma":0.028815143,"threshold_uncertainty_score":0.76083434},"labels":[],"label_agreement":null},{"id":"W6980412434","doi":"","title":"Capital Power Reports Fourth Quarter and Year-End 2014 Results - Energy (ENERGY01) News","year":2015,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Capital (architecture); Energy (signal processing); Power (physics); Capital expenditure","score_opus":0.0035661587379635065,"score_gpt":0.1746114863136785,"score_spread":0.171045327575715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6980412434","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001094229,0.0008560581,0.0011376311,0.0148013765,0.008918089,0.00011423407,0.01650125,0.0021663455,0.9544106],"genre_scores_gemma":[0.0035734018,0.0004483747,0.00035779882,0.0023921335,0.00081370235,0.000039169427,0.0058302647,0.00062282314,0.98592234],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983979,0.00007836977,0.000039204526,0.00010743951,0.0011496777,0.00022736508],"domain_scores_gemma":[0.9983966,0.0002121657,0.00007485192,0.00015979605,0.0008919401,0.00026467553],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0013395082,0.0011134859,0.0006187456,0.001936562,0.0012891466,0.0065683993,0.0010390882,0.0030488523,0.34676275],"category_scores_gemma":[0.0045633167,0.00048264494,0.0009464289,0.0015350328,0.000547365,0.002478454,0.0011624497,0.003283117,0.19595134],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026993055,0.000020643483,0.000063194966,0.000011209761,0.0000019409326,0.000010169051,0.00000209006,0.000067384404,0.000037435995,0.0015547666,0.9895719,0.00863212],"study_design_scores_gemma":[0.000026809386,0.000024680963,0.001349695,0.000049116832,0.0000055317123,0.000016811031,0.000019659186,0.00043383188,0.00048183664,0.0022994354,0.99527884,0.000013714406],"about_ca_topic_score_codex":0.024076005,"about_ca_topic_score_gemma":0.04863286,"teacher_disagreement_score":0.34676275,"about_ca_system_score_codex":0.0028200771,"about_ca_system_score_gemma":0.003976766,"threshold_uncertainty_score":0.93176365},"labels":[],"label_agreement":null},{"id":"W6980443612","doi":"","title":"Capital Power places 202-MW turbine order with Vestas for Alberta auction project","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Order (exchange); Power (physics); Capital (architecture); Turbine; Work (physics); Government (linguistics)","score_opus":0.003992880519686611,"score_gpt":0.19743708496085802,"score_spread":0.1934442044411714,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6980443612","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034893665,0.00028160194,0.009942202,0.0013804472,0.00066662324,0.00016953198,0.006336736,0.003298299,0.9430309],"genre_scores_gemma":[0.23521174,0.00024207655,0.008484075,0.00019828856,0.00008938743,0.000044089244,0.008636492,0.0014066781,0.7456872],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992793,0.000041751046,0.000007845978,0.000054863813,0.00048993266,0.00012624075],"domain_scores_gemma":[0.9992435,0.00008046515,0.00001722586,0.000085964864,0.0004140899,0.00015876966],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094140024,0.0005970229,0.00042405023,0.00077655265,0.0014336475,0.0025019238,0.0011386848,0.00084458326,0.11328557],"category_scores_gemma":[0.0019326222,0.00031615858,0.00040337615,0.00060469063,0.00050310703,0.0008588433,0.0005888422,0.001166628,0.014093318],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011015952,0.00028865648,0.004465302,0.00011135036,0.000044710014,0.00047915065,0.00012192622,0.045298703,0.0038793385,0.054426875,0.76635534,0.123427026],"study_design_scores_gemma":[0.000304055,0.00023344174,0.01014031,0.000097912314,0.0000392594,0.00014655771,0.0005547962,0.14877655,0.008544121,0.018408753,0.81266826,0.000085992826],"about_ca_topic_score_codex":0.35382578,"about_ca_topic_score_gemma":0.634506,"teacher_disagreement_score":0.6461742,"about_ca_system_score_codex":0.0052711708,"about_ca_system_score_gemma":0.010399904,"threshold_uncertainty_score":0.7035326},"labels":[],"label_agreement":null},{"id":"W6982557839","doi":"","title":"Innergex and the In-SHUCK-ch Nation sign a partnership agreement to develop six hydroelectric projects in British Columbia - TSX (TSXTSX01) News","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"General partnership; Sign (mathematics); Hydroelectricity; Agreement","score_opus":0.009331781836135986,"score_gpt":0.1968042842872421,"score_spread":0.1874725024511061,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6982557839","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023164907,0.00069450005,0.00096829544,0.011363463,0.002558877,0.00007181895,0.0033087842,0.0011729937,0.9775448],"genre_scores_gemma":[0.002439455,0.00017014303,0.00014992406,0.00044943666,0.000062982355,0.000008057152,0.00067064416,0.00013389277,0.99591535],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99930537,0.00003044304,0.000008438149,0.000035980163,0.0004544404,0.00016526176],"domain_scores_gemma":[0.9990928,0.000073763236,0.000019752917,0.00006806757,0.0005297654,0.00021586164],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064304454,0.0006052848,0.00030966316,0.00078364334,0.0021312574,0.0044462285,0.00066808186,0.0024566231,0.22299467],"category_scores_gemma":[0.0012649291,0.0003758311,0.00039565514,0.0008233281,0.00062385487,0.0010417526,0.0010423905,0.0030357246,0.054935582],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038850954,0.000021728805,0.00027699553,0.000022019813,0.000002584784,0.000060451,0.000021723128,0.00022402874,0.0001786992,0.0027371738,0.97809726,0.01831849],"study_design_scores_gemma":[0.0000082651,0.0000074989025,0.001881934,0.000021524636,0.0000016101149,0.00001618074,0.000078472825,0.00035192884,0.00030213592,0.00060605165,0.9967179,0.0000065731247],"about_ca_topic_score_codex":0.23608874,"about_ca_topic_score_gemma":0.61664414,"teacher_disagreement_score":0.76391125,"about_ca_system_score_codex":0.004055031,"about_ca_system_score_gemma":0.0070911082,"threshold_uncertainty_score":0.74599147},"labels":[],"label_agreement":null},{"id":"W6983221179","doi":"","title":"Load flow feasibility under extreme contingencies","year":2007,"lang":"en","type":"dissertation","venue":"eScholarship@McGill (McGill)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Work (physics)","score_opus":0.02592225306464615,"score_gpt":0.2450732642547654,"score_spread":0.21915101119011923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6983221179","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7707652,0.00040963804,0.15155275,0.002000582,0.00018684856,0.0003801099,0.0032541829,0.0008929446,0.07055779],"genre_scores_gemma":[0.99130017,0.00008089304,0.0049662995,0.000034089786,0.000019450912,0.000051612114,0.00039146782,0.00006244089,0.003093541],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993517,0.00026858438,0.000025669091,0.00007926024,0.000117823714,0.00015701343],"domain_scores_gemma":[0.9970387,0.0021379262,0.00022547043,0.00009026074,0.0003259298,0.00018172293],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019901793,0.0006939195,0.0009961212,0.001354461,0.0007726773,0.0018573216,0.00072457537,0.0011630573,0.009367724],"category_scores_gemma":[0.0055845017,0.0005329359,0.00057863444,0.00093036523,0.0006738353,0.0013654823,0.00087227527,0.0009209009,0.000751359],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035806946,0.000042210067,0.0014418245,0.000073427684,0.000027188438,0.00028575433,0.000052232946,0.9810095,0.000972367,0.004079314,0.0020793304,0.009578745],"study_design_scores_gemma":[0.00004946695,0.00016135843,0.0029895059,0.000028103232,0.000020811402,0.000092114184,0.00017268182,0.986803,0.00078652875,0.007746568,0.0011269836,0.000022877157],"about_ca_topic_score_codex":0.009447135,"about_ca_topic_score_gemma":0.009100105,"teacher_disagreement_score":0.009447135,"about_ca_system_score_codex":0.0011801578,"about_ca_system_score_gemma":0.0008534262,"threshold_uncertainty_score":0.031338215},"labels":[],"label_agreement":null},{"id":"W6983306794","doi":"","title":"Manitoba Hydro Does Wisconsin Power Sales to Help Hydro Projects","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydro power; Power (physics); Hydroelectricity; Hydropower","score_opus":0.005926439511053578,"score_gpt":0.19342926693259715,"score_spread":0.1875028274215436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6983306794","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008496223,0.00023712813,0.0012905393,0.002132485,0.00017836067,0.00006700892,0.008344496,0.0013722909,0.97788143],"genre_scores_gemma":[0.015162192,0.00033618347,0.0011838793,0.00017961333,0.00002846355,0.000023620345,0.0024326667,0.0004567142,0.98019665],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99983525,0.000015406224,0.0000034859117,0.000019467809,0.00008277114,0.000043687847],"domain_scores_gemma":[0.99909604,0.00008110354,0.000042581072,0.000074178344,0.00047013295,0.00023600867],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00040858067,0.00062449614,0.00015949058,0.0011332138,0.0018544075,0.0022519554,0.00065745035,0.000601213,0.2990314],"category_scores_gemma":[0.001468354,0.00037267728,0.00019780625,0.0016623385,0.00031594103,0.0009114532,0.00081339374,0.00069054734,0.048718058],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006498826,0.00012849478,0.0054787803,0.00006169617,0.0000104835635,0.00009644368,0.00014000083,0.0012791372,0.00043829277,0.008860054,0.8792477,0.10419387],"study_design_scores_gemma":[0.000023814917,0.00001630268,0.0074942503,0.000053976382,0.000007586564,0.000039924944,0.000385358,0.0026001509,0.0009941367,0.0015916489,0.9867829,0.000009940059],"about_ca_topic_score_codex":0.27798316,"about_ca_topic_score_gemma":0.6939091,"teacher_disagreement_score":0.7220168,"about_ca_system_score_codex":0.003428817,"about_ca_system_score_gemma":0.007477799,"threshold_uncertainty_score":0.99984664},"labels":[],"label_agreement":null},{"id":"W6983450256","doi":"","title":"The Mental Health Toll of the COVID-19 Pandemic on Older Adults with Migraine: A Prospective Analysis of Depression Using the Canadian Longitudinal Study on Aging","year":2024,"lang":"en","type":"article","venue":"DOAJ (DOAJ: Directory of Open Access Journals)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Depression (economics); Longitudinal study; Mental health; Pandemic; Life course approach; Public health; Multivariate analysis; Logistic regression; Cohort","score_opus":0.148811829697152,"score_gpt":0.5025531031685565,"score_spread":0.3537412734714045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6983450256","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9773538,0.0045532836,0.00015060339,0.0012337394,0.000051335064,0.00015416057,0.013440735,0.000010082661,0.0030521455],"genre_scores_gemma":[0.9893616,0.0026023753,0.000305506,0.0002764392,0.000041296324,0.00009115241,0.0067761503,0.0000055474147,0.0005399585],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9987067,0.00014789797,0.00014709365,0.00019655301,0.00045070236,0.00035095445],"domain_scores_gemma":[0.9970938,0.00014521343,0.0010625294,0.00019883846,0.00092203997,0.00057763705],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017629587,0.0004088579,0.00052725145,0.0015627034,0.0018224232,0.0015617202,0.0015402817,0.00094343175,0.0016288171],"category_scores_gemma":[0.0046104295,0.00042963665,0.0012471142,0.0038575707,0.0004427071,0.00077541097,0.001788747,0.00152171,0.00023905648],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052273354,0.000025811305,0.9974716,0.0000336571,0.0001257063,0.000017855096,0.0001971576,0.000024660625,0.000026629019,0.000048298916,0.00062119437,0.0013552336],"study_design_scores_gemma":[0.0000033043711,0.000011524637,0.99928004,0.00003189933,0.000035157496,0.000019999457,0.00026635343,0.0000535325,0.0000059501153,0.00001197277,0.00027498588,0.0000053589174],"about_ca_topic_score_codex":0.8720858,"about_ca_topic_score_gemma":0.9237078,"teacher_disagreement_score":0.12791419,"about_ca_system_score_codex":0.005098154,"about_ca_system_score_gemma":0.0066655274,"threshold_uncertainty_score":0.25733495},"labels":[],"label_agreement":null},{"id":"W6987175843","doi":"","title":"SNL: Developer seeks DOE permit for power line to connect Alaska hydro project to Canada","year":2013,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydro power; Hydroelectricity; Line (geometry); Power (physics); Process (computing); Hydropower","score_opus":0.0073596690527900814,"score_gpt":0.20982683603559887,"score_spread":0.20246716698280878,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6987175843","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0049180384,0.00023626538,0.008110647,0.0014058143,0.000182899,0.00020255503,0.037035253,0.0055177286,0.9423909],"genre_scores_gemma":[0.027876979,0.0004737171,0.006978198,0.00034434773,0.000041025836,0.000098306205,0.017107759,0.0031291759,0.9439504],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999368,0.0000353367,0.0000078587855,0.000046421766,0.00043107747,0.000111325295],"domain_scores_gemma":[0.99820197,0.00012921769,0.00003219171,0.00013392542,0.0013152367,0.00018738482],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006878853,0.0007229931,0.0004107481,0.0015259671,0.0020548305,0.0016511776,0.0013382935,0.0008500719,0.22444513],"category_scores_gemma":[0.00221122,0.0005661484,0.00033279523,0.0016241396,0.00053692545,0.00095124234,0.00074420584,0.0009522389,0.04185259],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008243905,0.00005310071,0.0014496271,0.00008950637,0.000010013723,0.00007209681,0.00006570703,0.003952213,0.0010079248,0.009400974,0.9331206,0.05069575],"study_design_scores_gemma":[0.00005675302,0.000023782097,0.002001612,0.00005830625,0.000008485787,0.00004045795,0.00016690887,0.007277457,0.0022655316,0.0026910948,0.9853873,0.000022257063],"about_ca_topic_score_codex":0.7649644,"about_ca_topic_score_gemma":0.9188353,"teacher_disagreement_score":0.2350356,"about_ca_system_score_codex":0.007469296,"about_ca_system_score_gemma":0.018300565,"threshold_uncertainty_score":0.75084376},"labels":[],"label_agreement":null},{"id":"W6987531942","doi":"","title":"TD Opens First Net-Zero Energy Bank Branch in Canada","year":2011,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Energy (signal processing); Energy consumption; Key (lock); Field (mathematics)","score_opus":0.004309113360227615,"score_gpt":0.14480354843455762,"score_spread":0.14049443507433002,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6987531942","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021842768,0.0009816868,0.002514463,0.005020509,0.0007933431,0.00011836812,0.011056118,0.0010269207,0.9566458],"genre_scores_gemma":[0.044623215,0.00041480528,0.00089815626,0.00027373925,0.000046935576,0.000013887871,0.0025098547,0.00028372204,0.9509357],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993156,0.000022493077,0.000008005444,0.000060581722,0.00030406748,0.00028929254],"domain_scores_gemma":[0.9988549,0.000053763746,0.000022362872,0.000043664953,0.00067837053,0.0003470065],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040228423,0.0005639612,0.00050421746,0.0011712818,0.0040301266,0.0036711572,0.0009516689,0.0011024715,0.15861388],"category_scores_gemma":[0.0012107204,0.00034810827,0.0006173562,0.0012273086,0.0006625357,0.00084275793,0.0011105165,0.0017169546,0.01882322],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029860064,0.00014816382,0.007944772,0.00013048206,0.000035434638,0.00038743604,0.00014159156,0.0048221243,0.0009412439,0.040700007,0.8515372,0.092912965],"study_design_scores_gemma":[0.00006908613,0.00003909185,0.015871083,0.00008929553,0.000021660564,0.00011486173,0.0005102005,0.0070322673,0.0018743924,0.0059283907,0.9684181,0.000031675758],"about_ca_topic_score_codex":0.92161644,"about_ca_topic_score_gemma":0.97613645,"teacher_disagreement_score":0.15861388,"about_ca_system_score_codex":0.023034668,"about_ca_system_score_gemma":0.049948413,"threshold_uncertainty_score":0.5306163},"labels":[],"label_agreement":null},{"id":"W6987717041","doi":"","title":"Transmission pricing","year":2000,"lang":"en","type":"dissertation","venue":"TSpace (University of Toronto)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Toronto","keywords":"","score_opus":0.004410312274074996,"score_gpt":0.19331925250194118,"score_spread":0.1889089402278662,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6987717041","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0067595914,0.0017109393,0.060948912,0.0024557277,0.00054384297,0.000043056425,0.00066797435,0.00033795007,0.9265319],"genre_scores_gemma":[0.24586597,0.004978761,0.01714316,0.00031314822,0.00043028535,0.00005169142,0.0010091058,0.00032095902,0.729887],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99974877,0.000045756806,0.000005882879,0.00004769149,0.00011365233,0.00003827743],"domain_scores_gemma":[0.9996642,0.00005847717,0.000018718325,0.000089206755,0.00012697035,0.000042516644],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029779968,0.0005668433,0.00044065499,0.0005213989,0.0007077165,0.0020049498,0.00063547405,0.00065604167,0.10740549],"category_scores_gemma":[0.0013484522,0.0002648414,0.00032542436,0.0015666268,0.0005361775,0.0015204353,0.0005097327,0.0012893252,0.012875905],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034648565,0.00006780593,0.00022226856,0.00006666092,0.000017737524,0.00009784075,0.0000731137,0.017765477,0.00071073056,0.69307417,0.13615562,0.15171397],"study_design_scores_gemma":[0.000034991404,0.000041730993,0.0008567166,0.000106992535,0.000036960297,0.00028392344,0.00014482912,0.052383337,0.0017466836,0.43667012,0.5076704,0.000023269587],"about_ca_topic_score_codex":0.008921725,"about_ca_topic_score_gemma":0.012377715,"teacher_disagreement_score":0.10740549,"about_ca_system_score_codex":0.0021787987,"about_ca_system_score_gemma":0.0015160296,"threshold_uncertainty_score":0.3593071},"labels":[],"label_agreement":null},{"id":"W6987748689","doi":"","title":"Tohoku Electric Power : Financial Results for the First Quarter of Fiscal 2019","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Electric power; Power (physics); Electric utility; Measure (data warehouse)","score_opus":0.0034305712901298996,"score_gpt":0.18380597226431772,"score_spread":0.1803754009741878,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6987748689","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025073443,0.0054550455,0.0021654135,0.020710716,0.0049176547,0.00012989971,0.09303227,0.001197412,0.84731805],"genre_scores_gemma":[0.14659475,0.007886848,0.0028582392,0.001867634,0.0007829014,0.000104951025,0.073650256,0.0010332401,0.76522124],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99970394,0.00002807242,0.000013927264,0.000021750853,0.00016038479,0.00007186587],"domain_scores_gemma":[0.9993488,0.00005038342,0.00004528192,0.000025995112,0.00041612017,0.00011338097],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008222395,0.0009171972,0.00028541425,0.0015296675,0.00095041847,0.002706224,0.00053278607,0.000880321,0.11128414],"category_scores_gemma":[0.0020417103,0.00017902079,0.000356528,0.0020172247,0.00032102433,0.0017624894,0.0010768654,0.0013431842,0.030054891],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025875127,0.000097478405,0.0016947287,0.00020021498,0.000016448572,0.00007179749,0.000021128966,0.0015371365,0.00024410483,0.008822707,0.9288541,0.058181357],"study_design_scores_gemma":[0.000070648435,0.00007388381,0.015289678,0.0002785558,0.000035311063,0.00009468574,0.00040085567,0.0058657173,0.0014081809,0.008847091,0.9675976,0.000037814763],"about_ca_topic_score_codex":0.031916052,"about_ca_topic_score_gemma":0.059806287,"teacher_disagreement_score":0.11128414,"about_ca_system_score_codex":0.002866875,"about_ca_system_score_gemma":0.0031271114,"threshold_uncertainty_score":0.3722825},"labels":[],"label_agreement":null},{"id":"W6988107879","doi":"","title":"Wind Power in Canada, Market Outlook to 2030, Update 2017 – Capacity, Generation, Levelized Cost of Energy (LCOE), Investment Trends, Regulations and Company Profiles","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Investment (military); Cost of electricity by source; Energy (signal processing); Power (physics); Renewable energy; Electricity; Power station","score_opus":0.01466204847592147,"score_gpt":0.2030198627333538,"score_spread":0.1883578142574323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6988107879","genre_codex":"dataset","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018652959,0.025606863,0.0021770706,0.0050867675,0.0012827127,0.00025501748,0.62147343,0.0015021622,0.32396305],"genre_scores_gemma":[0.085327804,0.045571048,0.005946092,0.0011437915,0.00030844918,0.00015311249,0.42745346,0.00079036556,0.4333059],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988682,0.000021896876,0.000041355976,0.00005522526,0.00083095283,0.00018248399],"domain_scores_gemma":[0.9974305,0.000041260704,0.00006848397,0.000037506903,0.002279962,0.0001422488],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066551747,0.0013000917,0.0005630616,0.0040436313,0.0016912759,0.0024247747,0.0012823549,0.0006343694,0.020000258],"category_scores_gemma":[0.0018741516,0.0005597093,0.00069609995,0.0136386445,0.0003996527,0.0013910506,0.000615234,0.0010660194,0.0069443346],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009898034,0.00005213068,0.007837008,0.00056953606,0.000047246216,0.00009853758,0.00008682322,0.00497971,0.000233951,0.0031469588,0.91174287,0.071106225],"study_design_scores_gemma":[0.00004934577,0.000024105833,0.0693369,0.0007011727,0.00006949723,0.0000974229,0.00041713478,0.0032295804,0.0007830177,0.0013517514,0.9238721,0.00006786979],"about_ca_topic_score_codex":0.9941637,"about_ca_topic_score_gemma":0.9971085,"teacher_disagreement_score":0.030317198,"about_ca_system_score_codex":0.030317198,"about_ca_system_score_gemma":0.07989954,"threshold_uncertainty_score":0.21996772},"labels":[],"label_agreement":null},{"id":"W6988131567","doi":"","title":"Wind power's prevailing direction in Canada? Big and foreign-owned","year":2013,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Field (mathematics); Work (physics); Global Positioning System; Term (time)","score_opus":0.003524814941055924,"score_gpt":0.15345400977509424,"score_spread":0.14992919483403833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6988131567","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6349407,0.0077544334,0.001236471,0.03856547,0.0005778069,0.000044234188,0.025737826,0.00013981173,0.29100332],"genre_scores_gemma":[0.92232263,0.0036654437,0.00043498655,0.0008093527,0.00006754674,0.0000057531247,0.0033415952,0.00007739694,0.06927535],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997385,0.000011692399,0.0000052025625,0.000022261229,0.00009654983,0.00012575743],"domain_scores_gemma":[0.99915063,0.00003662544,0.00005573087,0.0000114245,0.00049024203,0.0002553762],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031371633,0.00024545324,0.00018039143,0.0007098811,0.0019751894,0.0029569229,0.000588921,0.00042543098,0.009267207],"category_scores_gemma":[0.001365134,0.00012392472,0.00027316532,0.0027247272,0.00056478963,0.00080984004,0.0004932821,0.0009413796,0.0004159854],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044765446,0.00013479071,0.37927762,0.0002589395,0.0001576275,0.00101062,0.0023134316,0.017744416,0.00047192583,0.06346252,0.42068434,0.11403612],"study_design_scores_gemma":[0.00007275328,0.0000312374,0.6540598,0.0004714937,0.00015211999,0.0002090316,0.03449205,0.016970193,0.0007342161,0.009771272,0.28291696,0.00011887305],"about_ca_topic_score_codex":0.99634176,"about_ca_topic_score_gemma":0.9991498,"teacher_disagreement_score":0.027317764,"about_ca_system_score_codex":0.027317764,"about_ca_system_score_gemma":0.04753281,"threshold_uncertainty_score":0.19820517},"labels":[],"label_agreement":null},{"id":"W6988158994","doi":"","title":"Wind Power Market (Belgium,Canada) 2016 Market Size , Share , Trend , Analysis , Research Report, Fo","year":2016,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Trend analysis; Wind power; Market size; Market power; Market share; Statistical analysis","score_opus":0.00888836524924279,"score_gpt":0.24870981918787197,"score_spread":0.23982145393862916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6988158994","genre_codex":"dataset","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039312143,0.0027690588,0.001717098,0.0015386993,0.00049249287,0.00019108164,0.67664886,0.0015057625,0.27582484],"genre_scores_gemma":[0.121345304,0.0047432277,0.0023708304,0.00016931712,0.00017072444,0.00010964384,0.44180477,0.00069927063,0.4285869],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994356,0.000011474521,0.000013914049,0.000058477406,0.00038013727,0.00010028429],"domain_scores_gemma":[0.9986957,0.000059432936,0.000075663214,0.000042633077,0.0009774311,0.00014913849],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004423831,0.0008988202,0.00046279412,0.0027872995,0.0009171706,0.002830956,0.00073460577,0.00037729985,0.028036807],"category_scores_gemma":[0.0018346746,0.00030210894,0.00038308976,0.0074020964,0.00023699088,0.0011627366,0.00030816937,0.00071381166,0.010994354],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034008615,0.00008527936,0.0095369555,0.00020781973,0.000036922003,0.00014083045,0.00007696395,0.0041973814,0.0005408384,0.0049751056,0.9188867,0.060975034],"study_design_scores_gemma":[0.00010548397,0.00006274634,0.10763434,0.00019013933,0.00005141535,0.0001492936,0.00052915316,0.006859677,0.0034252345,0.0017739177,0.8791624,0.000056236768],"about_ca_topic_score_codex":0.85708046,"about_ca_topic_score_gemma":0.90273565,"teacher_disagreement_score":0.14291954,"about_ca_system_score_codex":0.007256564,"about_ca_system_score_gemma":0.013157485,"threshold_uncertainty_score":0.28752238},"labels":[],"label_agreement":null},{"id":"W6989107577","doi":"","title":"American Electric Power : Issues Financials for Second Quarter of 2019","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Electric power; Power (physics); Electric utility","score_opus":0.0029023555492346162,"score_gpt":0.20865079567493727,"score_spread":0.20574844012570265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989107577","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0009588612,0.0019129348,0.0006754336,0.015414653,0.0063643353,0.00005807537,0.0064349608,0.0007501552,0.9674307],"genre_scores_gemma":[0.005323513,0.0012579748,0.00032319006,0.0014779181,0.00080830307,0.00003484848,0.0028802883,0.0002136877,0.9876803],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99929094,0.00005131115,0.000020050093,0.00004672125,0.0005045448,0.000086493616],"domain_scores_gemma":[0.9987143,0.00011797022,0.00007875128,0.00006708548,0.0007869915,0.0002349891],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0008825971,0.0009639371,0.00048349387,0.0020099988,0.0017156973,0.005395806,0.0007208037,0.003233311,0.34970748],"category_scores_gemma":[0.00370924,0.0003270828,0.00048515538,0.0020146538,0.00055501104,0.002657655,0.0011653024,0.003071844,0.16142376],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001977675,0.000027034785,0.000119772194,0.00002289979,0.0000014725306,0.000018859502,0.0000040625664,0.00009450404,0.000057810495,0.0034483275,0.975071,0.02111455],"study_design_scores_gemma":[0.000014769374,0.000020127307,0.0010163097,0.000092638336,0.0000031878017,0.00003274036,0.000035270627,0.00055528956,0.00018113332,0.0039860527,0.994054,0.0000084632065],"about_ca_topic_score_codex":0.017613793,"about_ca_topic_score_gemma":0.039236233,"teacher_disagreement_score":0.34970748,"about_ca_system_score_codex":0.0029653092,"about_ca_system_score_gemma":0.0043415017,"threshold_uncertainty_score":0.92756337},"labels":[],"label_agreement":null},{"id":"W6989134617","doi":"","title":"Alberta Auction Results In 600 MW Of Record-Low Wind Power - North American Windpower","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Power (physics); Offshore wind power; Turbine; Scale (ratio)","score_opus":0.004133449131200736,"score_gpt":0.19823301165215512,"score_spread":0.1940995625209544,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989134617","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17277783,0.00086286204,0.010242383,0.00388202,0.0012333299,0.00012036408,0.0059847934,0.0021699488,0.80272657],"genre_scores_gemma":[0.6287907,0.00040898606,0.005076561,0.0004988799,0.00011415836,0.000025200901,0.007251052,0.0005774029,0.357257],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992539,0.00006008146,0.0000108961,0.000047655885,0.0004648914,0.00016250656],"domain_scores_gemma":[0.9994771,0.00009266307,0.000019444416,0.000046397527,0.00025921268,0.000105188235],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010946643,0.00057455176,0.0005839106,0.00061839004,0.0012339249,0.0026390296,0.00079446274,0.00080787105,0.041461002],"category_scores_gemma":[0.0014921324,0.00020319395,0.0006294016,0.00076021557,0.0006362431,0.00065443025,0.00051783805,0.0013178285,0.0056309407],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0035116046,0.0007169493,0.00701631,0.00023137545,0.0002114856,0.0016037864,0.000120846926,0.11706415,0.0045404877,0.07120514,0.6794718,0.11430605],"study_design_scores_gemma":[0.001392712,0.000739413,0.04986729,0.00019245288,0.00032994535,0.00078095053,0.0015676814,0.27963087,0.016723957,0.07520868,0.57330126,0.00026487064],"about_ca_topic_score_codex":0.19357735,"about_ca_topic_score_gemma":0.51879215,"teacher_disagreement_score":0.80642265,"about_ca_system_score_codex":0.0037161787,"about_ca_system_score_gemma":0.0042511923,"threshold_uncertainty_score":0.38490123},"labels":[],"label_agreement":null},{"id":"W6989187731","doi":"","title":"Alberta's Electricity Grid Under Strain: A Call for Additional Power Generation","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity generation; Electricity; Power grid; Power (physics); Distributed generation; Grid; Stand-alone power system","score_opus":0.00925936329577534,"score_gpt":0.2090764203364175,"score_spread":0.19981705704064215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989187731","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003113422,0.0011792501,0.0020009098,0.04677607,0.0087768,0.00012282976,0.007691814,0.0014345826,0.92890435],"genre_scores_gemma":[0.010020918,0.00058570073,0.0014219334,0.007589658,0.00042431502,0.000028001907,0.0029573427,0.00029150202,0.9766807],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992867,0.000034472425,0.0000068706777,0.000026431328,0.00045293683,0.00019261477],"domain_scores_gemma":[0.9990839,0.000051220202,0.000016131527,0.0000402358,0.00042296766,0.0003856992],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007507685,0.0008656712,0.00046840528,0.0007347689,0.0019323768,0.0034785562,0.0012516744,0.0052840924,0.1688662],"category_scores_gemma":[0.001563522,0.0003039116,0.00068171986,0.0009790289,0.00096412585,0.00095737015,0.0014146018,0.0037662042,0.030371295],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041242518,0.00002265605,0.00012804019,0.000017412876,0.0000031151728,0.00005842289,0.000007349593,0.0005329356,0.00015908822,0.004150018,0.9832298,0.011649881],"study_design_scores_gemma":[0.00006774705,0.000026352274,0.002283483,0.000052533254,0.000007329692,0.00003610606,0.00012676444,0.001756397,0.0002481868,0.0051920214,0.99018455,0.000018470651],"about_ca_topic_score_codex":0.6501738,"about_ca_topic_score_gemma":0.87886775,"teacher_disagreement_score":0.34982622,"about_ca_system_score_codex":0.008356498,"about_ca_system_score_gemma":0.034561496,"threshold_uncertainty_score":0.7037728},"labels":[],"label_agreement":null},{"id":"W6989667273","doi":"","title":"Canada's non-hydro renewable power capacity continues to increase | Stock Market | NYSE Composite Stock Quote | NYA Company Stock Market Quotes","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Stock (firearms); Stock market; Stock exchange; Stock market bubble; Market maker; Renewable energy","score_opus":0.006639237696408273,"score_gpt":0.2018735086147402,"score_spread":0.19523427091833193,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989667273","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008514617,0.0012427398,0.00085806724,0.00403806,0.00081368693,0.00012997516,0.09337386,0.002181503,0.88884753],"genre_scores_gemma":[0.024132779,0.0014792115,0.00078058103,0.00039396223,0.0002019997,0.00003669343,0.039086834,0.0007146283,0.93317324],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99853766,0.000015407655,0.000017574259,0.000047091475,0.001217244,0.00016502633],"domain_scores_gemma":[0.996633,0.000114193266,0.0001037691,0.00008410998,0.0025755786,0.0004893917],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005602102,0.00082254776,0.00050063926,0.003319743,0.0022897644,0.00565748,0.00078848185,0.00097615685,0.15121295],"category_scores_gemma":[0.0031695915,0.00039857786,0.0005424822,0.0034215804,0.00062905793,0.0012140417,0.0007904469,0.001367641,0.048687547],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058014142,0.000028165754,0.0017065532,0.000067609064,0.00000951832,0.00005101317,0.00002915129,0.00051166286,0.00023765367,0.0040831673,0.9700748,0.023142789],"study_design_scores_gemma":[0.000030844614,0.000015648011,0.014041389,0.00007029343,0.00001011372,0.000031599844,0.0001024718,0.0014620416,0.00091024477,0.001008447,0.98229045,0.000026591444],"about_ca_topic_score_codex":0.86690193,"about_ca_topic_score_gemma":0.939887,"teacher_disagreement_score":0.15121295,"about_ca_system_score_codex":0.015448916,"about_ca_system_score_gemma":0.030277554,"threshold_uncertainty_score":0.5058577},"labels":[],"label_agreement":null},{"id":"W6989698510","doi":"","title":"The Canada Data Center Colocation Market to Soar with $1.85 Billion Investment by 2029, Adding Over 960 MW Power Capacity – Arizton – Shimla Online","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Soar; Investment (military); Data center; Center (category theory); Power (physics); Power market; Market power","score_opus":0.008325930066935869,"score_gpt":0.19773396799154552,"score_spread":0.18940803792460964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989698510","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035577284,0.0013703079,0.0050258497,0.021455755,0.002790777,0.00020850559,0.029293552,0.0034887008,0.9328088],"genre_scores_gemma":[0.0219156,0.0013639578,0.0031858077,0.0026928196,0.00020392853,0.00003515495,0.013360313,0.0010627166,0.9561796],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991541,0.000024124107,0.0000086654845,0.000044538825,0.0006031867,0.00016537217],"domain_scores_gemma":[0.9984092,0.000046096517,0.000019656465,0.000046947673,0.0010353148,0.00044276338],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006315429,0.0010847341,0.00035130847,0.0012632206,0.0032310637,0.004503775,0.000916877,0.0016202581,0.27445775],"category_scores_gemma":[0.0014184848,0.0004544617,0.0006474087,0.001547883,0.00089586095,0.0016549778,0.0013383133,0.0024405292,0.07514114],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029532086,0.00001702136,0.00026404677,0.000024131676,0.0000044980643,0.000027451533,0.00001040104,0.00044484402,0.0003403482,0.004668875,0.97784495,0.016323928],"study_design_scores_gemma":[0.000019398123,0.000010587945,0.001306864,0.00003060599,0.0000045792694,0.000021612017,0.00011453131,0.0016859435,0.0004584985,0.0017717738,0.9945589,0.000016778282],"about_ca_topic_score_codex":0.83509153,"about_ca_topic_score_gemma":0.939584,"teacher_disagreement_score":0.27445775,"about_ca_system_score_codex":0.0166023,"about_ca_system_score_gemma":0.036930833,"threshold_uncertainty_score":0.91815263},"labels":[],"label_agreement":null},{"id":"W6989721049","doi":"","title":"Canadian Solar Infrastructure Fund : Impact of the Temporary Output Curtailment by Kyushu Electric Power","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electric power; Photovoltaic system; Electricity; Electric utility; Renewable energy; Electric energy; Power (physics)","score_opus":0.003835969195222738,"score_gpt":0.1941258495350542,"score_spread":0.19028988033983146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989721049","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03081899,0.010178337,0.0012480437,0.08371845,0.0037925276,0.00022282949,0.07041641,0.00065366563,0.79895073],"genre_scores_gemma":[0.23650329,0.010253161,0.0031622376,0.0052049793,0.00053432933,0.00011749125,0.020418625,0.00049163104,0.7233142],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99854255,0.00006410521,0.000016106453,0.000055900975,0.00096948695,0.00035183737],"domain_scores_gemma":[0.9978275,0.00010159388,0.000049688344,0.00004451058,0.0016239936,0.00035263307],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013118247,0.00084137026,0.00055065495,0.0012936298,0.0025203452,0.003216689,0.0013788536,0.001971736,0.033936586],"category_scores_gemma":[0.00419422,0.00026689615,0.0006211687,0.0022615616,0.0007853845,0.0007730065,0.00093248265,0.0014144933,0.0021445286],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023818147,0.000054311116,0.002186678,0.000105887,0.000038550526,0.00012563268,0.000047265356,0.004826028,0.00026029142,0.02806168,0.9255257,0.038529813],"study_design_scores_gemma":[0.00021409523,0.00005892854,0.036830485,0.00025515113,0.0000721797,0.00008192966,0.0005853055,0.010278413,0.0009426509,0.0068316045,0.94377404,0.00007529804],"about_ca_topic_score_codex":0.9870886,"about_ca_topic_score_gemma":0.99268883,"teacher_disagreement_score":0.044160955,"about_ca_system_score_codex":0.044160955,"about_ca_system_score_gemma":0.13188258,"threshold_uncertainty_score":0.32041162},"labels":[],"label_agreement":null},{"id":"W6989750310","doi":"","title":"BluEarth Closes Debt Financing and Kicks Off Construction for Alberta Wind Power Project","year":2015,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Debt; Wind power; Power (physics); Government (linguistics); Boom; Project finance","score_opus":0.0065232252113359545,"score_gpt":0.20725560954097916,"score_spread":0.20073238432964322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989750310","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.085516326,0.0011845989,0.0059325234,0.008914308,0.000723593,0.00019432032,0.004143921,0.0019961114,0.8913943],"genre_scores_gemma":[0.23746738,0.0006491417,0.003455055,0.00075149076,0.000104841914,0.00004499675,0.0034221292,0.00043317355,0.75367177],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993363,0.00004314218,0.00000752546,0.000037981088,0.00039037742,0.00018466963],"domain_scores_gemma":[0.9984444,0.00014592594,0.000057180197,0.0001191357,0.0006340403,0.00059946143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013075984,0.00030638647,0.00024707805,0.0008710134,0.0018906271,0.002444774,0.00083749765,0.0011302927,0.04107497],"category_scores_gemma":[0.0036969958,0.0002537944,0.0002537085,0.000614945,0.000518689,0.00066998485,0.0011314239,0.0016392517,0.0034044222],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039050487,0.00018705582,0.011019378,0.00007535133,0.00002441135,0.0004935995,0.00021612836,0.012954051,0.001220935,0.047891963,0.77505034,0.1504763],"study_design_scores_gemma":[0.000119675846,0.0001433032,0.030412124,0.00013560583,0.000018986171,0.00015384558,0.0009985241,0.023010718,0.0016770547,0.01795247,0.92532694,0.000050829793],"about_ca_topic_score_codex":0.39748937,"about_ca_topic_score_gemma":0.7292959,"teacher_disagreement_score":0.60251063,"about_ca_system_score_codex":0.0062315986,"about_ca_system_score_gemma":0.016224671,"threshold_uncertainty_score":0.79035145},"labels":[],"label_agreement":null},{"id":"W6989752502","doi":"","title":"Canadian Solar Infrastructure Fund : Impact of the Temporary Output Curtailment by Kyushu Electric Power","year":2022,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electric power; Photovoltaic system; Electricity; Electric utility; Renewable energy; Electric energy; Power (physics)","score_opus":0.0031414942905701676,"score_gpt":0.18575616706005144,"score_spread":0.18261467276948126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989752502","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030972824,0.009329119,0.0011146613,0.07637381,0.0034478887,0.00022595025,0.073292635,0.00065750664,0.80458564],"genre_scores_gemma":[0.22948991,0.009361911,0.0028922355,0.004855423,0.0005256509,0.000115183444,0.019519325,0.00047637927,0.732764],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99850476,0.000064819076,0.00001622249,0.000056286262,0.0009992714,0.00035874706],"domain_scores_gemma":[0.9978002,0.00010457053,0.000050864022,0.000047012152,0.0016602697,0.00033709072],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013183715,0.000881862,0.0005455662,0.001384707,0.002614409,0.003323358,0.0014336496,0.0020859137,0.03381143],"category_scores_gemma":[0.0042109946,0.0002755714,0.00062027306,0.002443439,0.00078807515,0.00077404885,0.0009067528,0.0014226219,0.002053637],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002449985,0.00005791155,0.0022751275,0.00009907674,0.00003932054,0.00013390873,0.000046639867,0.004707009,0.0002533601,0.026768802,0.92956907,0.035804745],"study_design_scores_gemma":[0.00024307652,0.00006264203,0.03992828,0.00024194812,0.00007678335,0.00008400564,0.0006125688,0.0109325675,0.0010515968,0.006972736,0.9397122,0.00008163908],"about_ca_topic_score_codex":0.98808575,"about_ca_topic_score_gemma":0.9932706,"teacher_disagreement_score":0.98808575,"about_ca_system_score_codex":0.04508803,"about_ca_system_score_gemma":0.13022538,"threshold_uncertainty_score":0.32713807},"labels":[],"label_agreement":null},{"id":"W6989753006","doi":"","title":"Canadian Solar and SkyPower Limited Enter Purchase and Joint Venture Agreement","year":2012,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Joint venture; Joint (building); Government (linguistics); Measure (data warehouse)","score_opus":0.005008284901087231,"score_gpt":0.1644821121683369,"score_spread":0.15947382726724968,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989753006","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016799856,0.00027839522,0.0008436565,0.0012709891,0.00022182609,0.00009084584,0.009698566,0.00066749065,0.9852482],"genre_scores_gemma":[0.0040944177,0.00016102045,0.00032455445,0.000094537696,0.000019459418,0.000011658776,0.0016272543,0.00018598339,0.99348116],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.998626,0.000032483982,0.000015309062,0.000088846726,0.0009491564,0.00028818118],"domain_scores_gemma":[0.99700004,0.00015808419,0.000043411634,0.00017995715,0.0021047222,0.0005137965],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00075242587,0.0010862687,0.00068895303,0.0025457782,0.0046927095,0.0048657176,0.0014134457,0.0021695637,0.39559695],"category_scores_gemma":[0.0026968212,0.000733719,0.0005593099,0.0026998138,0.0007976153,0.0013075243,0.00093147485,0.0019712932,0.10053257],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060685376,0.000048825634,0.00045584276,0.000038132574,0.000004308919,0.000057006568,0.000045727764,0.0007446852,0.00021347037,0.010594968,0.95667654,0.031059772],"study_design_scores_gemma":[0.000025382333,0.000014530353,0.003300519,0.00003529403,0.0000055415553,0.000027428676,0.00014219085,0.0014349015,0.00060202205,0.0016263931,0.992767,0.000019000954],"about_ca_topic_score_codex":0.8696211,"about_ca_topic_score_gemma":0.96134806,"teacher_disagreement_score":0.8696211,"about_ca_system_score_codex":0.017708225,"about_ca_system_score_gemma":0.037809905,"threshold_uncertainty_score":0.8621076},"labels":[],"label_agreement":null},{"id":"W6989798581","doi":"","title":"Canada Reaches Nearly 13 GW Of Installed Wind Capacity - North American Windpower","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Wind speed; Wind shear; Wind gradient; Offshore wind power","score_opus":0.004940336085799043,"score_gpt":0.1562420953481725,"score_spread":0.15130175926237344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989798581","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011141029,0.000636515,0.0028150845,0.0017035137,0.00021334921,0.00011815163,0.033588704,0.001320544,0.9484631],"genre_scores_gemma":[0.067209475,0.0013685001,0.0046269163,0.0006690814,0.000031631298,0.00005441661,0.020505685,0.00060148456,0.90493286],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996063,0.000009072031,0.000004369857,0.000024154206,0.00023761946,0.00011849873],"domain_scores_gemma":[0.9993716,0.00001672725,0.000011014141,0.00001556453,0.00050079246,0.00008437038],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002507501,0.00074083806,0.0002921294,0.0012366734,0.002412523,0.0020214221,0.0006229586,0.00051850383,0.08299219],"category_scores_gemma":[0.0007181519,0.00025298746,0.00046899327,0.0019682045,0.00043392676,0.0005561101,0.0007742362,0.0007274432,0.015630811],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010031331,0.00008789509,0.004709769,0.00019530565,0.000023932029,0.00014212406,0.00009875791,0.003348786,0.0009100838,0.029304946,0.8357292,0.12534899],"study_design_scores_gemma":[0.000018342289,0.000014909446,0.00979196,0.00008479335,0.00001042196,0.000041864772,0.00022681794,0.0025347713,0.0011158447,0.003158543,0.9829826,0.000019080204],"about_ca_topic_score_codex":0.9732371,"about_ca_topic_score_gemma":0.9913419,"teacher_disagreement_score":0.08299219,"about_ca_system_score_codex":0.0156143345,"about_ca_system_score_gemma":0.036774635,"threshold_uncertainty_score":0.27763653},"labels":[],"label_agreement":null},{"id":"W6989829110","doi":"","title":"Capital Power reports third quarter 2011 results (CNW)","year":2011,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Power (physics); Capital (architecture); Capital expenditure; Work (physics)","score_opus":0.004932426071296233,"score_gpt":0.1743588522325436,"score_spread":0.16942642616124737,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989829110","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019535965,0.00065134186,0.001541092,0.001605174,0.0011398797,0.00017613397,0.09687271,0.001428133,0.894632],"genre_scores_gemma":[0.005031418,0.00069999765,0.00097351277,0.00018003059,0.00013835185,0.0000870953,0.03576911,0.000641229,0.95647925],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985057,0.0001013432,0.0000551435,0.00013257323,0.0010181861,0.0001871541],"domain_scores_gemma":[0.998398,0.000119568496,0.00006971229,0.00020669929,0.0010712374,0.00013469036],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0011436723,0.0014936356,0.0008190544,0.0037203827,0.0010298014,0.0048023723,0.0012524733,0.0012097809,0.35551968],"category_scores_gemma":[0.0031450775,0.0006042571,0.0007961744,0.0045976397,0.00035731043,0.0016643736,0.0007737631,0.0018106833,0.22168073],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006334531,0.00006423525,0.00021407095,0.000062179555,0.0000063033604,0.000013374778,0.0000067672986,0.0008230122,0.00008176574,0.0024699364,0.971741,0.024453979],"study_design_scores_gemma":[0.000060533486,0.00004113622,0.0043260385,0.0000954332,0.000019604931,0.000030038555,0.000035644425,0.0021871822,0.0013704041,0.0025093078,0.98930013,0.000024564402],"about_ca_topic_score_codex":0.08354551,"about_ca_topic_score_gemma":0.13954574,"teacher_disagreement_score":0.35551968,"about_ca_system_score_codex":0.0049443366,"about_ca_system_score_gemma":0.0052468046,"threshold_uncertainty_score":0.91927296},"labels":[],"label_agreement":null},{"id":"W6990679083","doi":"","title":"Efectos Económicos para los consumidores de las nuevas tarifas de acceso a la red eléctrica en España","year":2021,"lang":"es","type":"dissertation","venue":"Zaguan (University of Zaragoza Repository)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Free access; Limiting; Quarter (Canadian coin)","score_opus":0.004335589203166421,"score_gpt":0.20112609796501202,"score_spread":0.1967905087618456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6990679083","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96845746,0.000762951,0.0022232665,0.00018101397,0.000010636406,0.000019992623,0.0011567065,0.00002554324,0.027162429],"genre_scores_gemma":[0.9765513,0.00093099434,0.0012454257,0.000041903,0.000004302713,0.00002119205,0.00081308704,0.000017077438,0.020374708],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99977094,0.00004053973,0.000013581413,0.000039882376,0.00009733493,0.000037689788],"domain_scores_gemma":[0.9987638,0.0005598991,0.0001300135,0.00005209855,0.0004587767,0.000035455585],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006483207,0.00028175538,0.00020676068,0.00080841326,0.00028167988,0.001228525,0.0002753857,0.0004014927,0.0084273815],"category_scores_gemma":[0.0013896531,0.00014212714,0.00045726186,0.0012387714,0.00029250287,0.0005110172,0.00037517113,0.00025500375,0.0006732473],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002446198,0.00019587141,0.70796525,0.001198185,0.00041850787,0.001050545,0.0025656992,0.07042511,0.041747168,0.014269152,0.0026996185,0.1550187],"study_design_scores_gemma":[0.000022805109,0.0004894074,0.9500635,0.0001464075,0.0001519341,0.00018853137,0.005691982,0.0080264,0.013378997,0.0033093886,0.01848235,0.000048376995],"about_ca_topic_score_codex":0.042103235,"about_ca_topic_score_gemma":0.066385426,"teacher_disagreement_score":0.042103235,"about_ca_system_score_codex":0.0016886209,"about_ca_system_score_gemma":0.0005615347,"threshold_uncertainty_score":0.08371633},"labels":[],"label_agreement":null},{"id":"W6990777461","doi":"","title":"Electric Royalties to Acquire 1.5% NSR on Canadian Lithium Deposit","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Lithium (medication); Electricity; Production (economics); Government (linguistics)","score_opus":0.004585236549683864,"score_gpt":0.1833295851337382,"score_spread":0.17874434858405433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6990777461","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009294417,0.0008024837,0.0013312736,0.008951447,0.0012597021,0.00014110668,0.004327694,0.0008604082,0.9730314],"genre_scores_gemma":[0.035241205,0.00045674905,0.0005177496,0.001065424,0.00012413002,0.000018985755,0.0015576635,0.00025250737,0.96076554],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983834,0.000047424757,0.000019490533,0.000069199195,0.0011437642,0.00033676223],"domain_scores_gemma":[0.99754363,0.000089784255,0.000041019528,0.00013400736,0.001830215,0.00036121928],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001093569,0.0006784671,0.00036419526,0.0017074407,0.0035199933,0.0023722753,0.0010094859,0.0021143882,0.2054179],"category_scores_gemma":[0.0038141678,0.00027703316,0.0006222939,0.000942273,0.0008263143,0.0009451173,0.0013633241,0.0017103626,0.047266383],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020840298,0.00007471847,0.0014455442,0.000077033474,0.00001969494,0.00023794782,0.00009323185,0.0010037766,0.0021777665,0.026096685,0.8978668,0.070698336],"study_design_scores_gemma":[0.000038538856,0.000045983194,0.0045448127,0.000058744117,0.0000096608255,0.00013937186,0.00017012349,0.0013374352,0.0016105154,0.002238467,0.98978114,0.000025200508],"about_ca_topic_score_codex":0.69181806,"about_ca_topic_score_gemma":0.8314709,"teacher_disagreement_score":0.30818194,"about_ca_system_score_codex":0.016983686,"about_ca_system_score_gemma":0.029064141,"threshold_uncertainty_score":0.68719137},"labels":[],"label_agreement":null},{"id":"W6992011164","doi":"","title":"Introduction Session 7: Canada and U.S. Approaches to the Evolving North American Energy Relatiosnhip in the Aftermath of the 2003 Electricity Blackout: Market Forces vs. Government Regulation","year":2005,"lang":"en","type":"article","venue":"Canada-United States law journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Session (web analytics); Government (linguistics); Electricity; Energy (signal processing); Energy market; Electricity market; Energy policy","score_opus":0.004831227050533522,"score_gpt":0.1476789344757915,"score_spread":0.14284770742525799,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6992011164","genre_codex":"other","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0036394906,0.009889349,0.0020457634,0.3236328,0.035402104,0.0008773301,0.0037588377,0.0004293925,0.6203249],"genre_scores_gemma":[0.020427648,0.00314742,0.0010930095,0.16363616,0.006642278,0.0005019552,0.0010087575,0.00023650413,0.8033062],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9965475,0.00026777122,0.00006173074,0.00039396642,0.001557784,0.0011712465],"domain_scores_gemma":[0.99679536,0.0004898167,0.000085333944,0.00010713078,0.0016054155,0.0009169794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046687927,0.0010528674,0.000864294,0.0015452522,0.019509431,0.013283121,0.0033005301,0.0248503,0.09596524],"category_scores_gemma":[0.0043453434,0.0006628639,0.0014606641,0.0015614051,0.0033432692,0.0036375884,0.0038231467,0.015773395,0.016843833],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021204005,0.00004261325,0.00024645388,0.000056017318,0.0000048892243,0.000094263436,0.00055852486,0.0000886089,0.00030965055,0.023761982,0.9691562,0.0056596342],"study_design_scores_gemma":[0.00001540734,0.000012816916,0.0015251873,0.00017692751,0.00000831113,0.000018977307,0.0010738296,0.000055426743,0.00015562138,0.0037394932,0.99319226,0.000025660112],"about_ca_topic_score_codex":0.63056374,"about_ca_topic_score_gemma":0.865948,"teacher_disagreement_score":0.96695757,"about_ca_system_score_codex":0.033042416,"about_ca_system_score_gemma":0.06677092,"threshold_uncertainty_score":0.7432239},"labels":[],"label_agreement":null},{"id":"W6995501967","doi":"","title":"OPTIMAL WIND ENERGY PENETRATION MODEL FOR PAKISTAN","year":2015,"lang":"en","type":"dissertation","venue":"HEC National Digital Library","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Hydropower; Energy mix; Electricity generation; Electric power system; Renewable energy; Electricity; Market penetration; Fossil fuel; Sustainable development","score_opus":0.010964719893016305,"score_gpt":0.2344953187012434,"score_spread":0.2235305988082271,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6995501967","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5485354,0.0026779969,0.27744836,0.0017479326,0.00027578525,0.00022103412,0.0050333217,0.00048653924,0.16357361],"genre_scores_gemma":[0.98270535,0.00059321313,0.005292061,0.000054540506,0.000021620337,0.00006813507,0.00068445795,0.00003233665,0.010548183],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999018,0.00002060747,0.0000045534102,0.00002233903,0.000018385488,0.0000324158],"domain_scores_gemma":[0.9998217,0.00007159993,0.000028817714,0.0000050447247,0.00005676171,0.000016142165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019400568,0.00053896516,0.00041719823,0.000325135,0.00037800855,0.0008859581,0.0006882531,0.00090718525,0.0059667733],"category_scores_gemma":[0.0004250426,0.00034065123,0.0005459405,0.00037413216,0.00028759922,0.00052989396,0.0004281362,0.0005650451,0.00048177876],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016273018,0.000007114676,0.0006321106,0.00001691421,0.000004800643,0.00009809366,0.000012006593,0.9954697,0.00019152123,0.0017943665,0.0005174267,0.0012396784],"study_design_scores_gemma":[0.000005118027,0.000009894991,0.00024617199,0.0000055677915,0.000004836509,0.000017160688,0.000021053444,0.9983188,0.00006489595,0.00072570547,0.00057746714,0.0000033874903],"about_ca_topic_score_codex":0.035745118,"about_ca_topic_score_gemma":0.022280315,"teacher_disagreement_score":0.035745118,"about_ca_system_score_codex":0.0008354548,"about_ca_system_score_gemma":0.00088343007,"threshold_uncertainty_score":0.07107413},"labels":[],"label_agreement":null},{"id":"W6996032294","doi":"","title":"Research and Markets: Wind Power in Canada, Market Outlook to 2025 - Capacity, Generation, Market Share, Levelized Cost of Energy (LCOE), Investment Trends, Regulations and Company Profiles","year":2012,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Investment (military); Wind power; Energy (signal processing); Cost of electricity by source; Power market; Energy market; Power (physics); Renewable energy","score_opus":0.03214564481661895,"score_gpt":0.24723413266662655,"score_spread":0.21508848785000761,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996032294","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03967269,0.030114245,0.0013659169,0.01205308,0.00066773006,0.00023655494,0.45243573,0.0012363001,0.4622178],"genre_scores_gemma":[0.16303627,0.04534323,0.0029415851,0.00069793785,0.0003091198,0.00009516721,0.2035739,0.0005736081,0.5834291],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991059,0.000018554816,0.000030081328,0.000056396362,0.0006016455,0.00018746672],"domain_scores_gemma":[0.99692035,0.0001274544,0.0001511947,0.000054064698,0.0024885717,0.00025848649],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006405581,0.0011580461,0.00052353984,0.006002907,0.0020733015,0.0032775374,0.0013914044,0.00074797345,0.039773576],"category_scores_gemma":[0.0025266923,0.00044530482,0.0008091878,0.028615547,0.00063106447,0.0017424719,0.0006270751,0.0009384446,0.00565909],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008011181,0.00011002796,0.02021526,0.0007520682,0.000052579962,0.00016676141,0.00030523547,0.0066996757,0.00033441067,0.010085123,0.8489502,0.112248465],"study_design_scores_gemma":[0.000065723994,0.000055505312,0.2215599,0.0011036781,0.00012333338,0.00015616721,0.0030423626,0.008831923,0.0018515362,0.0058979066,0.7571875,0.00012457196],"about_ca_topic_score_codex":0.9943011,"about_ca_topic_score_gemma":0.9971213,"teacher_disagreement_score":0.039773576,"about_ca_system_score_codex":0.033995096,"about_ca_system_score_gemma":0.07277195,"threshold_uncertainty_score":0.24665278},"labels":[],"label_agreement":null},{"id":"W6996195358","doi":"","title":"Regresso às tarifas reguladas - uma nova oportunidade para os consumidores de eletricidade","year":2018,"lang":"pt","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Nova scotia; Statistical analysis; Electrocution","score_opus":0.02349473699048245,"score_gpt":0.2581095767454087,"score_spread":0.23461483975492622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996195358","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5814618,0.001448422,0.37949935,0.002757319,0.00033565317,0.00010720236,0.0019465451,0.0015244397,0.030919258],"genre_scores_gemma":[0.94144815,0.000723213,0.03958003,0.000118136624,0.00007433452,0.00005073135,0.0006727404,0.00036774282,0.016965082],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99946696,0.00013651831,0.00002519004,0.000134324,0.0001750177,0.000062036226],"domain_scores_gemma":[0.9976877,0.0012935913,0.00023755772,0.00037128237,0.00036450484,0.000045407833],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001591329,0.00084757584,0.00060676754,0.0004725327,0.00026674962,0.001654844,0.0007705916,0.00051060604,0.0068938155],"category_scores_gemma":[0.008902182,0.00036962735,0.000729503,0.0007818509,0.00069582404,0.0014862487,0.00047579603,0.0013287371,0.00097054825],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000920895,0.00033603844,0.035368342,0.00053511985,0.00030873402,0.000188712,0.00030308147,0.6080123,0.034241654,0.040370643,0.0048114723,0.27460304],"study_design_scores_gemma":[0.00004837796,0.0002099828,0.02866333,0.0000930769,0.00016735878,0.000104988554,0.00020056755,0.92411095,0.02141835,0.017099086,0.007832467,0.000051466403],"about_ca_topic_score_codex":0.010211377,"about_ca_topic_score_gemma":0.015022663,"teacher_disagreement_score":0.010211377,"about_ca_system_score_codex":0.00085061113,"about_ca_system_score_gemma":0.0013401665,"threshold_uncertainty_score":0.02306211},"labels":[],"label_agreement":null},{"id":"W6996361087","doi":"","title":"RE Royalties Provides $6.3 Million Financing for a 200 Megawatt Solar Project in Alberta, Canada","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Investment (military); Work (physics); Payment","score_opus":0.006302046186512186,"score_gpt":0.20016690633054007,"score_spread":0.19386486014402787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996361087","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016844276,0.0019183676,0.0026612189,0.015713034,0.0018846048,0.000213204,0.010604422,0.001955486,0.94820535],"genre_scores_gemma":[0.029597724,0.000733231,0.0009403817,0.0005407167,0.00006145224,0.000018193043,0.0030022056,0.00022739492,0.9648787],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99912673,0.000034396075,0.000009418343,0.000056527417,0.00049639895,0.00027651247],"domain_scores_gemma":[0.99825126,0.000063498395,0.00001841412,0.000044510805,0.0009827933,0.0006394936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071758893,0.0007768473,0.00034555304,0.0013043402,0.0040852283,0.0025812762,0.0009926656,0.0016902551,0.15080422],"category_scores_gemma":[0.0012747559,0.0004578692,0.0005413198,0.0010065692,0.00075226603,0.00060816953,0.0013204883,0.0015354911,0.023577036],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001412519,0.00008136618,0.0024431164,0.00007072534,0.000016921987,0.0002994672,0.00009097081,0.0013782674,0.0014282138,0.00883832,0.91280466,0.07240671],"study_design_scores_gemma":[0.000061941086,0.000038093673,0.008453009,0.000054938446,0.000011312576,0.00013376468,0.00037920853,0.0028233272,0.00082570914,0.0010317963,0.98615927,0.000027634036],"about_ca_topic_score_codex":0.9518084,"about_ca_topic_score_gemma":0.97714466,"teacher_disagreement_score":0.15080422,"about_ca_system_score_codex":0.018962186,"about_ca_system_score_gemma":0.06698291,"threshold_uncertainty_score":0.5044904},"labels":[],"label_agreement":null},{"id":"W6996588553","doi":"","title":"Solar, Wind Projects Could Fail Under New Alberta Grid Regulations","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Grid; Power grid; Wind power; Government (linguistics)","score_opus":0.011458897421276537,"score_gpt":0.2156415007981875,"score_spread":0.20418260337691096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996588553","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012807775,0.00040572826,0.001683711,0.009944924,0.0008964039,0.00012508893,0.005273832,0.00066667644,0.9681958],"genre_scores_gemma":[0.0305891,0.00024484683,0.0010432308,0.0018970534,0.000077148514,0.000035285542,0.001811833,0.00012408436,0.9641773],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988612,0.000057905538,0.000013686803,0.000037523892,0.00069539645,0.00033436363],"domain_scores_gemma":[0.99880743,0.000097019365,0.000036538037,0.000076475015,0.00075871166,0.00022382176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013043726,0.00069013983,0.00024409941,0.0006647134,0.0028956928,0.0028736605,0.0012034441,0.002766122,0.049321845],"category_scores_gemma":[0.0020858452,0.00035765872,0.0004066227,0.0006343984,0.0006135046,0.00066866894,0.0009324676,0.0017843788,0.007262788],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001645358,0.00009492554,0.0033313024,0.00004808822,0.000013372935,0.0002914514,0.000102753176,0.0050360495,0.0010232297,0.038238145,0.9032706,0.048385486],"study_design_scores_gemma":[0.00006406271,0.000046971214,0.015477554,0.00005355172,0.00001575573,0.00007564661,0.0004161078,0.0046770493,0.001200932,0.0076050423,0.9703331,0.000034261793],"about_ca_topic_score_codex":0.7758177,"about_ca_topic_score_gemma":0.9475675,"teacher_disagreement_score":0.22418231,"about_ca_system_score_codex":0.010784282,"about_ca_system_score_gemma":0.030354125,"threshold_uncertainty_score":0.4510051},"labels":[],"label_agreement":null},{"id":"W6996653278","doi":"","title":"Strengthening the Power Systems Business Structure in Canada","year":2012,"lang":"de","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Business system planning; Electric power system; Organizational structure; Key (lock)","score_opus":0.0033051141829518755,"score_gpt":0.15799108952236202,"score_spread":0.15468597533941014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996653278","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19468428,0.005088184,0.0053398316,0.10639797,0.00080511527,0.00022809704,0.0033908614,0.0004579986,0.6836077],"genre_scores_gemma":[0.6352805,0.003983305,0.003259187,0.005119987,0.00014998266,0.000026959251,0.0014466156,0.00015713865,0.3505764],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99805486,0.000107410684,0.00003307408,0.00008165259,0.0009041493,0.00081896177],"domain_scores_gemma":[0.9952283,0.00029358052,0.000111219015,0.00011716503,0.0026693034,0.0015805397],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012218091,0.00032367217,0.0001926159,0.0012452755,0.004365096,0.004640328,0.0009869434,0.0011668719,0.013142152],"category_scores_gemma":[0.0050972905,0.00025742824,0.00029354266,0.002215911,0.0011229069,0.0012428848,0.0015597518,0.0019893441,0.00072637363],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001867129,0.0003122846,0.028944142,0.00023998474,0.000060997336,0.0007437731,0.0014054301,0.015257265,0.0019993344,0.2989423,0.40307018,0.24883763],"study_design_scores_gemma":[0.00006361872,0.0000636776,0.067250535,0.00016011813,0.000037181442,0.0001444636,0.0038527534,0.013157275,0.0021385245,0.012513007,0.90055907,0.00005973576],"about_ca_topic_score_codex":0.98792213,"about_ca_topic_score_gemma":0.995274,"teacher_disagreement_score":0.07490821,"about_ca_system_score_codex":0.07490821,"about_ca_system_score_gemma":0.23937495,"threshold_uncertainty_score":0.54349965},"labels":[],"label_agreement":null},{"id":"W6997413455","doi":"","title":"Wind Power in Canada, Market Outlook to 2025, 2013 Update - Capacity, Generation, Levelized Cost of Energy (LCOE), Investment Trends, Regulations and Company Profiles - kcentv.com - KCEN HD","year":2013,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Investment (military); Cost of electricity by source; Energy (signal processing); Power (physics); Renewable energy; Electricity; Electricity generation","score_opus":0.012250674312337053,"score_gpt":0.19132937314823378,"score_spread":0.17907869883589672,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6997413455","genre_codex":"dataset","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013153642,0.013825422,0.0012215312,0.004847178,0.00065088394,0.00014670687,0.710162,0.0012547834,0.2547379],"genre_scores_gemma":[0.08229528,0.028962657,0.0038022525,0.00095445465,0.00018085363,0.000088267276,0.4380914,0.0007930824,0.44483167],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99933857,0.000012081557,0.000019631729,0.00003376502,0.0004792999,0.00011664723],"domain_scores_gemma":[0.9986265,0.000019721323,0.000026106083,0.000019212574,0.0012226881,0.000085780135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003892827,0.0008429808,0.00039565965,0.0024753849,0.0016223652,0.0021228166,0.00087638624,0.0004921345,0.026855808],"category_scores_gemma":[0.0012219708,0.00039697805,0.0005008653,0.010002057,0.00028700836,0.00080122915,0.0005442768,0.00081322086,0.008338976],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006531996,0.000027931204,0.0060804244,0.00030018255,0.000023098306,0.00006385534,0.00004950351,0.0031482526,0.00013671095,0.0015451424,0.93970114,0.048858367],"study_design_scores_gemma":[0.00007877224,0.000024187166,0.11379281,0.0005567103,0.00006560936,0.00011234124,0.0005583192,0.003846762,0.0008668397,0.0014309951,0.87860376,0.000062853156],"about_ca_topic_score_codex":0.994408,"about_ca_topic_score_gemma":0.9977082,"teacher_disagreement_score":0.026855808,"about_ca_system_score_codex":0.026228469,"about_ca_system_score_gemma":0.055954732,"threshold_uncertainty_score":0.19030178},"labels":[],"label_agreement":null},{"id":"W6997440642","doi":"","title":"Wind Power in Canada, Market Outlook to 2030 Capacity, Generation, Investment Trends, Regulations and Company Profiles (Kruger Energy Inc., Invenergy LLC, Innergex Renewable Energy Inc., Capital Power Corporation)","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Renewable energy; Wind power; Investment (military); Capital (architecture); Energy (signal processing); Power (physics); Power market; Capital investment","score_opus":0.008099879278335062,"score_gpt":0.17274761656366427,"score_spread":0.16464773728532922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6997440642","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03709053,0.012790068,0.0013552719,0.004288978,0.0003634539,0.00013168626,0.41933483,0.0011504127,0.5234948],"genre_scores_gemma":[0.20851322,0.034966413,0.0037159936,0.0006645526,0.000114647846,0.00008647424,0.28022888,0.00063638575,0.47107336],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99950993,0.000008801547,0.000011746732,0.000029566309,0.00033197293,0.00010798303],"domain_scores_gemma":[0.99909866,0.000018297216,0.000024764988,0.0000136241015,0.00075370574,0.00009104967],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003278005,0.00075322366,0.00024390865,0.0026902067,0.0021872378,0.0020055454,0.0006519495,0.00038084382,0.027113669],"category_scores_gemma":[0.0012030242,0.0002681247,0.0004063387,0.010091821,0.00035627303,0.0008010391,0.00039938895,0.0006892541,0.005699545],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000112822076,0.000039772254,0.019524535,0.00047849736,0.00003609217,0.00016149924,0.0002247515,0.0073969928,0.00034039182,0.011802862,0.87843996,0.08144183],"study_design_scores_gemma":[0.000049634233,0.00003345659,0.14852065,0.00054603367,0.00006012901,0.00015707736,0.0014583995,0.004890142,0.0009867977,0.0032956903,0.83992684,0.00007508389],"about_ca_topic_score_codex":0.9956066,"about_ca_topic_score_gemma":0.998059,"teacher_disagreement_score":0.027970126,"about_ca_system_score_codex":0.027970126,"about_ca_system_score_gemma":0.059848383,"threshold_uncertainty_score":0.20293844},"labels":[],"label_agreement":null},{"id":"W6997442506","doi":"","title":"Wind power producers are scrambling to supply Hydro-Québec","year":2023,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Scrambling; Power (physics); Production (economics); Noise (video)","score_opus":0.0070180452586402035,"score_gpt":0.20364577563741693,"score_spread":0.19662773037877673,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6997442506","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025594324,0.0007895873,0.008180412,0.006300884,0.0005586723,0.00017761234,0.005070726,0.0009830106,0.9523448],"genre_scores_gemma":[0.10113329,0.0004342431,0.003432531,0.000802945,0.0000414682,0.00003774844,0.001438231,0.00025492048,0.89242464],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997948,0.000018938988,0.0000024769258,0.000020103329,0.000090033995,0.00007371671],"domain_scores_gemma":[0.9996099,0.00002535284,0.000012587737,0.00002817217,0.00027362845,0.00005038015],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0002817782,0.00037118106,0.00020114987,0.00038831515,0.0017936289,0.0013155362,0.00055048615,0.00067518395,0.09262436],"category_scores_gemma":[0.0007096393,0.00018747825,0.00028752573,0.00053193263,0.00029308908,0.00043408395,0.00038825462,0.0007291127,0.0069729155],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000253247,0.00012218315,0.007173638,0.00015623512,0.000044646367,0.00036031211,0.00019927644,0.017869433,0.0050183665,0.048297603,0.6944533,0.22605184],"study_design_scores_gemma":[0.000082917,0.000050170747,0.011620979,0.000079086916,0.000019441488,0.0000754121,0.00028951647,0.019985262,0.0026740707,0.0041002743,0.9609961,0.000026782955],"about_ca_topic_score_codex":0.9002055,"about_ca_topic_score_gemma":0.96980536,"teacher_disagreement_score":0.90737563,"about_ca_system_score_codex":0.007704497,"about_ca_system_score_gemma":0.012963252,"threshold_uncertainty_score":0.3098594},"labels":[],"label_agreement":null},{"id":"W6997523676","doi":"","title":"Wind Power In Canada, Market Outlook To 2030, Update 2016-Capacity, Generation, Levelized Cost Of Energy (Lcoe), Investment Trends, Regulations And Company Profiles: Ken Research","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Cost of electricity by source; Investment (military); Energy (signal processing); Power (physics); Renewable energy; Electricity; Power market","score_opus":0.03645547549759486,"score_gpt":0.26038083389167355,"score_spread":0.22392535839407868,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6997523676","genre_codex":"dataset","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023955474,0.0359759,0.0020755967,0.009034185,0.0015319502,0.00020205752,0.5847279,0.0014107202,0.34108624],"genre_scores_gemma":[0.10304139,0.062485367,0.005874862,0.0013382719,0.00032207268,0.000097594275,0.3188428,0.0007078298,0.5072898],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99901235,0.00001714219,0.000031168645,0.000044239332,0.00074058474,0.0001543913],"domain_scores_gemma":[0.99811506,0.00003345017,0.000053009884,0.000026971715,0.0016438409,0.00012754023],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006108132,0.0011436136,0.0005196517,0.0031255928,0.0017350751,0.002446407,0.0010998884,0.00061625696,0.019675976],"category_scores_gemma":[0.0016847966,0.00045296026,0.0006648929,0.012548388,0.00040711064,0.0013325384,0.00062170683,0.0010369404,0.006068091],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000934573,0.000051535346,0.00994659,0.000559741,0.0000429401,0.00008387451,0.00008457242,0.0046132524,0.00020043096,0.0032643175,0.8928048,0.088254474],"study_design_scores_gemma":[0.00005547043,0.000031543677,0.09263455,0.00090334093,0.00008832641,0.00011072655,0.00073703786,0.0043436657,0.0009750635,0.0022017236,0.89783955,0.0000790725],"about_ca_topic_score_codex":0.99383765,"about_ca_topic_score_gemma":0.99777335,"teacher_disagreement_score":0.033940885,"about_ca_system_score_codex":0.033940885,"about_ca_system_score_gemma":0.08873645,"threshold_uncertainty_score":0.24625951},"labels":[],"label_agreement":null},{"id":"W6998899584","doi":"","title":"Bimbo Canada signs agreements to offset 100 per cent of its electricity consumption for Canadian operations","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Consumption (sociology); Offset (computer science); Mains electricity; Power consumption","score_opus":0.01487460656417821,"score_gpt":0.22421977769154103,"score_spread":0.2093451711273628,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6998899584","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0059537375,0.00086971506,0.0021259815,0.0110727735,0.0012636275,0.00026365096,0.016237652,0.00111048,0.96110237],"genre_scores_gemma":[0.018358784,0.000549146,0.001855022,0.0026279653,0.000048280832,0.00005898276,0.0033250723,0.00031266606,0.9728641],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99669456,0.00007252053,0.000026563197,0.00007589758,0.002383651,0.0007467605],"domain_scores_gemma":[0.9969127,0.00009121125,0.00004080967,0.00007201833,0.0025020908,0.00038113905],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013276455,0.001004157,0.0004620051,0.0024176673,0.0052442495,0.003330348,0.0014793806,0.0033480166,0.11583672],"category_scores_gemma":[0.00333458,0.0005210489,0.0010732358,0.002109737,0.0010127056,0.00074555917,0.0013299981,0.0026325001,0.018987697],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005987499,0.00005039817,0.0010091017,0.000086245236,0.000012436552,0.00006496109,0.0000737402,0.0009071795,0.00052997534,0.02609677,0.94018185,0.030927425],"study_design_scores_gemma":[0.000018676195,0.00001219022,0.0035623654,0.00004924686,0.000007301661,0.000022626642,0.00015782278,0.0007120957,0.00053362915,0.0011519697,0.9937541,0.000017984874],"about_ca_topic_score_codex":0.9866045,"about_ca_topic_score_gemma":0.99311405,"teacher_disagreement_score":0.11583672,"about_ca_system_score_codex":0.04184152,"about_ca_system_score_gemma":0.13684951,"threshold_uncertainty_score":0.3875124},"labels":[],"label_agreement":null},{"id":"W6998953134","doi":"","title":"Canada launches Electricity Transition Hub to assist utilities","year":2022,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Mains electricity; Electricity retailing; Electricity system; Government (linguistics); Work (physics)","score_opus":0.0037542145210830696,"score_gpt":0.1583467242662776,"score_spread":0.15459250974519453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6998953134","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004691766,0.00036040728,0.0018995508,0.011946302,0.0012559516,0.00033259322,0.015660912,0.0017735675,0.962079],"genre_scores_gemma":[0.008226884,0.00018868734,0.0007841022,0.0023639007,0.000053778756,0.000033154698,0.0027310562,0.00026405175,0.9853543],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989002,0.000029896948,0.000009717908,0.0000403365,0.0006169343,0.00040287778],"domain_scores_gemma":[0.99754083,0.00009955012,0.000029848632,0.00007886509,0.0015101228,0.0007408555],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007955366,0.00095890375,0.00036428694,0.0015718888,0.0048901415,0.00377762,0.0011634135,0.0035728882,0.19529098],"category_scores_gemma":[0.0020620998,0.0006073218,0.0007984932,0.0011608917,0.0009788298,0.00096776016,0.0014400807,0.0026373272,0.040584423],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003480157,0.000067245885,0.0007547463,0.000023269962,0.000004074297,0.000066679066,0.000020023605,0.00042361446,0.0002399692,0.004798968,0.97830075,0.015265785],"study_design_scores_gemma":[0.000045935183,0.000021959044,0.0039815814,0.00003157711,0.000005336078,0.000026119968,0.00014749813,0.0013956673,0.00048648467,0.0012977861,0.9925419,0.000018016633],"about_ca_topic_score_codex":0.9603159,"about_ca_topic_score_gemma":0.98777604,"teacher_disagreement_score":0.19529098,"about_ca_system_score_codex":0.020868255,"about_ca_system_score_gemma":0.093892746,"threshold_uncertainty_score":0.6533134},"labels":[],"label_agreement":null},{"id":"W6998962100","doi":"","title":"British Columbia to Proceed with $7.6 Billion Hydropower Project","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Government (linguistics); Hydroelectricity; Mains electricity","score_opus":0.0028754792255973253,"score_gpt":0.17406071061591333,"score_spread":0.171185231390316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6998962100","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003228033,0.00041550392,0.0010644116,0.0035737967,0.0003877912,0.00011054114,0.007537051,0.0008751495,0.9828079],"genre_scores_gemma":[0.007541197,0.00026252423,0.00058233575,0.00041694744,0.000020059108,0.000026424845,0.0018996818,0.00021792289,0.98903286],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99965763,0.00001723098,0.0000062984827,0.000026188927,0.00018758097,0.0001050318],"domain_scores_gemma":[0.999203,0.00003817858,0.000013637667,0.000049319046,0.000522332,0.00017357407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040084583,0.00062343286,0.00033163317,0.001039938,0.0031221833,0.0025250376,0.000769686,0.0014722898,0.26767465],"category_scores_gemma":[0.0012253071,0.00028927336,0.00031137455,0.001030727,0.0004112502,0.00076054846,0.0008925688,0.0018736218,0.060549367],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042966632,0.000053928583,0.0006743935,0.000043311844,0.000005622033,0.00007414396,0.000022774468,0.0006751274,0.00020025513,0.0070241787,0.9522944,0.03888883],"study_design_scores_gemma":[0.000023740393,0.0000143547295,0.0024341806,0.00006521443,0.0000051080333,0.000030421788,0.00013131168,0.0011406789,0.0004959214,0.0021069583,0.99353987,0.000012170009],"about_ca_topic_score_codex":0.63685524,"about_ca_topic_score_gemma":0.87721455,"teacher_disagreement_score":0.36314476,"about_ca_system_score_codex":0.0069710673,"about_ca_system_score_gemma":0.018649407,"threshold_uncertainty_score":0.8954609},"labels":[],"label_agreement":null},{"id":"W6999087188","doi":"","title":"Capital Power Reports First Quarter 2014 Results - Earnings News (EARNINGS) News","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Earnings; Quarter (Canadian coin); Power (physics); Capital (architecture)","score_opus":0.0030494757709702476,"score_gpt":0.17978997486426265,"score_spread":0.1767404990932924,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999087188","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023753238,0.0013995484,0.0011162676,0.012160115,0.008097706,0.00013756297,0.08509941,0.0029124483,0.88670164],"genre_scores_gemma":[0.007986757,0.0012058764,0.0004845172,0.0011699118,0.0018154283,0.000066167784,0.033700954,0.0009739136,0.9525964],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986418,0.00006567803,0.00005486673,0.0000991685,0.0009785644,0.00015987433],"domain_scores_gemma":[0.99713,0.00028198565,0.00029116415,0.00023864007,0.0016682157,0.0003901003],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0012703483,0.001130857,0.0005774494,0.0035085378,0.00095116714,0.0059318193,0.00084278284,0.0016458051,0.30215773],"category_scores_gemma":[0.0055653127,0.0004458682,0.0006310037,0.002918381,0.00031501078,0.002018157,0.00094177667,0.0021573359,0.1928389],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027299659,0.000023919294,0.00018351641,0.000017027103,0.0000029850069,0.000008727817,0.0000023444968,0.00008795309,0.00002892193,0.00097072305,0.9879484,0.01069808],"study_design_scores_gemma":[0.000047475496,0.000035538684,0.005435125,0.000091417285,0.0000137168,0.000018921763,0.000027987766,0.0008087735,0.0007563637,0.0026180171,0.9901239,0.000022647726],"about_ca_topic_score_codex":0.023861442,"about_ca_topic_score_gemma":0.031549904,"teacher_disagreement_score":0.30215773,"about_ca_system_score_codex":0.0023411512,"about_ca_system_score_gemma":0.0023682693,"threshold_uncertainty_score":0.9953873},"labels":[],"label_agreement":null},{"id":"W6999088457","doi":"","title":"Canadian Solar Subsidiary Recurrent Energy Secures Debt Financing for 20 MW California Solar Project","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Debt; Solar energy; Renewable energy; Subsidy; Government (linguistics); Energy (signal processing); Photovoltaic system","score_opus":0.0076388570341438785,"score_gpt":0.20938245515460496,"score_spread":0.20174359812046108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999088457","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.056397498,0.00081462244,0.0021553584,0.004563094,0.00029706344,0.0001469009,0.010569671,0.0010303726,0.9240255],"genre_scores_gemma":[0.33851212,0.0014142,0.0026221902,0.0005307498,0.00013221407,0.00004414082,0.008712468,0.00036098654,0.6476709],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99928457,0.000024867606,0.000008416563,0.00003516265,0.00045544512,0.0001915548],"domain_scores_gemma":[0.99881494,0.00007292183,0.000048276226,0.00008779106,0.0007630967,0.00021309935],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065743306,0.0003704053,0.00025161967,0.0012134648,0.0021594893,0.0021026933,0.0010834117,0.00091806805,0.043222737],"category_scores_gemma":[0.003674523,0.00022951196,0.00031579557,0.0013798999,0.00036738144,0.00046571577,0.00058083696,0.0009478127,0.0032562236],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020539388,0.00008925568,0.007992272,0.000077839126,0.000022932965,0.00021165953,0.00011092212,0.010033889,0.000757726,0.039820835,0.83475846,0.10591885],"study_design_scores_gemma":[0.00012386139,0.00006247607,0.03186555,0.00013008322,0.00004732584,0.000117910844,0.0005951281,0.02217536,0.002766878,0.007719089,0.93434715,0.000049280123],"about_ca_topic_score_codex":0.91486174,"about_ca_topic_score_gemma":0.9646771,"teacher_disagreement_score":0.08513826,"about_ca_system_score_codex":0.016894316,"about_ca_system_score_gemma":0.037724715,"threshold_uncertainty_score":0.17127925},"labels":[],"label_agreement":null},{"id":"W6999143062","doi":"","title":"Canadian Solar Won 94 MWp of Subsidy-Free Electricity Contracts in Alberta's Public Power Auction","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Power (physics); Government (linguistics); Work (physics); Electricity retailing","score_opus":0.003385146628688664,"score_gpt":0.16395020863557438,"score_spread":0.16056506200688572,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999143062","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25940487,0.0009431681,0.0075307116,0.005900225,0.00092624035,0.0003043501,0.0034232268,0.00070115,0.72086614],"genre_scores_gemma":[0.77638984,0.0002554071,0.0021728482,0.0005566301,0.000048743434,0.000029674695,0.0011260301,0.00012376679,0.21929698],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99850225,0.0001198023,0.000015652424,0.000082423925,0.0007295892,0.00055036944],"domain_scores_gemma":[0.9992059,0.0001301456,0.000019946376,0.000060757375,0.00036729217,0.0002159637],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015168375,0.00040991863,0.0005613613,0.0007735069,0.0031677915,0.003187149,0.0012863202,0.001469736,0.022116734],"category_scores_gemma":[0.0031580252,0.000319178,0.00052783045,0.0010892209,0.000975534,0.0006599765,0.0008095711,0.0017482135,0.0014649162],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002691308,0.0005486209,0.011621215,0.00015608728,0.00015367058,0.0007380284,0.00044126608,0.0792843,0.0020576217,0.2810295,0.46675807,0.15452035],"study_design_scores_gemma":[0.0013463503,0.000531753,0.04795686,0.00016988564,0.00022105954,0.00031445426,0.003867457,0.18570453,0.0039620358,0.068702795,0.6869961,0.00022668175],"about_ca_topic_score_codex":0.9278757,"about_ca_topic_score_gemma":0.9829118,"teacher_disagreement_score":0.0721243,"about_ca_system_score_codex":0.026683034,"about_ca_system_score_gemma":0.03929015,"threshold_uncertainty_score":0.19359988},"labels":[],"label_agreement":null},{"id":"W6999184264","doi":"","title":"Canada's electricity grid will need substantial changes to help achieve net zero: report","year":2022,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Grid; Power grid; Mains electricity; Production (economics); Work (physics)","score_opus":0.004677208254388867,"score_gpt":0.18285478518858714,"score_spread":0.17817757693419828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999184264","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014117209,0.0018467362,0.0021133223,0.06389976,0.0074890247,0.0007526934,0.08993752,0.0019797345,0.81786394],"genre_scores_gemma":[0.023823649,0.0012900162,0.0015363975,0.007394318,0.0002370456,0.00013031746,0.014333179,0.00026657825,0.95098853],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99807596,0.000038666636,0.000018787729,0.000045572124,0.0013722188,0.00044879864],"domain_scores_gemma":[0.9966264,0.00011827036,0.000036380243,0.000044650245,0.0025540665,0.0006202169],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011313657,0.00083125493,0.0003980237,0.0012406672,0.0026957546,0.0028516313,0.0013048647,0.003616429,0.051163547],"category_scores_gemma":[0.0022792371,0.0003451385,0.000638973,0.00088056386,0.0006938739,0.0007033261,0.0006962506,0.0021099327,0.0074337535],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004389369,0.000026706939,0.0005781548,0.000041352803,0.0000058353876,0.000034640114,0.00001668039,0.0003238236,0.00020478298,0.0025679688,0.9901451,0.0060112285],"study_design_scores_gemma":[0.000083298866,0.000055571036,0.013604277,0.000087180815,0.000032131087,0.00003451455,0.0003480606,0.0014453371,0.0014701356,0.0012208275,0.981584,0.00003464775],"about_ca_topic_score_codex":0.96337533,"about_ca_topic_score_gemma":0.98389983,"teacher_disagreement_score":0.051163547,"about_ca_system_score_codex":0.021167388,"about_ca_system_score_gemma":0.12873907,"threshold_uncertainty_score":0.17115915},"labels":[],"label_agreement":null},{"id":"W6999217740","doi":"","title":"Capital Power places 202 MW order with Vestas from auction in Canada","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Order (exchange); Power (physics); Capital (architecture); Work (physics); Government (linguistics)","score_opus":0.0013823714553315017,"score_gpt":0.1353820389855884,"score_spread":0.1339996675302569,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999217740","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.075649254,0.0008432136,0.0040524304,0.00508993,0.0012926382,0.00014154208,0.009380922,0.0012105507,0.9023396],"genre_scores_gemma":[0.28362668,0.0005256809,0.0023401217,0.00053893594,0.0000989962,0.000020992113,0.005037754,0.00057509996,0.70723575],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987577,0.000040886167,0.000015800651,0.00008979628,0.00067890063,0.00041690707],"domain_scores_gemma":[0.99900144,0.00006726309,0.000015187308,0.000045105706,0.0006437651,0.0002271288],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005784238,0.0005084094,0.00047473662,0.00094634737,0.0035313363,0.0047264756,0.0010122687,0.0011363806,0.059103694],"category_scores_gemma":[0.0020354968,0.00032438143,0.00064846256,0.0011023665,0.0009250979,0.000916759,0.0006367107,0.0016602813,0.0064272834],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00059206935,0.00018434148,0.008650655,0.00011372686,0.00007142016,0.000791862,0.00034643098,0.021810057,0.0014053462,0.08221557,0.81719804,0.06662045],"study_design_scores_gemma":[0.00014406058,0.000105060084,0.020557642,0.000104266466,0.00004413493,0.00014557493,0.0017031718,0.030681545,0.0034769329,0.011125734,0.9318059,0.00010599421],"about_ca_topic_score_codex":0.9610247,"about_ca_topic_score_gemma":0.9861493,"teacher_disagreement_score":0.059103694,"about_ca_system_score_codex":0.024945403,"about_ca_system_score_gemma":0.04580988,"threshold_uncertainty_score":0.19772154},"labels":[],"label_agreement":null},{"id":"W6999919734","doi":"","title":"5 Effective Strategies for Managing Rising Electricity Costs in Canada","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Mains electricity; Government (linguistics); Production (economics); Electricity retailing","score_opus":0.002969404557898509,"score_gpt":0.19575468518004688,"score_spread":0.19278528062214836,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999919734","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046307378,0.0027602583,0.009724735,0.0430013,0.0006114021,0.00033893267,0.004681602,0.00070044474,0.8918739],"genre_scores_gemma":[0.42213362,0.0039277487,0.019339355,0.0047380542,0.00015208678,0.00010280545,0.0023676502,0.00030284427,0.54693586],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99862885,0.00013277686,0.000030767365,0.00005223742,0.00067954656,0.0004758955],"domain_scores_gemma":[0.99832886,0.00013242467,0.000050727336,0.000039336108,0.001080848,0.00036777192],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085521303,0.00048096653,0.00020631503,0.0020214114,0.003449795,0.004543053,0.0012650525,0.0013412808,0.03209092],"category_scores_gemma":[0.0037959612,0.00024746612,0.00043380223,0.002307628,0.00063783134,0.0007367764,0.0011927906,0.0011510574,0.0015526436],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007718867,0.00015728147,0.0100238975,0.00026708745,0.00004835252,0.00042768422,0.0005987226,0.033014152,0.0009789825,0.17910151,0.54773194,0.22757313],"study_design_scores_gemma":[0.000064748085,0.000045732177,0.02590718,0.00029988965,0.00005327943,0.00012549566,0.0029973325,0.040453132,0.0012269851,0.017866742,0.91088027,0.00007920522],"about_ca_topic_score_codex":0.9897193,"about_ca_topic_score_gemma":0.995572,"teacher_disagreement_score":0.049880117,"about_ca_system_score_codex":0.049880117,"about_ca_system_score_gemma":0.14952914,"threshold_uncertainty_score":0.3619073},"labels":[],"label_agreement":null},{"id":"W7000247172","doi":"","title":"Expansión de las Redes de Transmisión Eléctrica en Norteamérica: Teoría y Aplicaciones","year":2010,"lang":"en","type":"other","venue":"Munich Personal RePEc Archive (Ludwig Maximilian University of Munich)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Network topology; Electric power; Transmission network; Transmission (telecommunications); Electric power transmission; Topology (electrical circuits); Variable (mathematics); Electrical network; Grid","score_opus":0.0033182047826573998,"score_gpt":0.16939095775578045,"score_spread":0.16607275297312304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7000247172","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6476867,0.0025843736,0.22562736,0.0013209133,0.00012915891,0.00040105756,0.0009213203,0.0023466402,0.11898238],"genre_scores_gemma":[0.92907673,0.0010106448,0.052609663,0.00003414591,0.000021902726,0.00010100123,0.00016203412,0.0000672286,0.016916653],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99985147,0.000048155318,0.000003893495,0.000021907836,0.00005091884,0.000023592023],"domain_scores_gemma":[0.99981433,0.000053612996,0.000027361539,0.000034726945,0.00005553956,0.000014377791],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007769787,0.0004908595,0.00020029364,0.00061091396,0.00033987872,0.0009465326,0.00048477165,0.00034342424,0.0056084297],"category_scores_gemma":[0.000967703,0.00011595605,0.00028173308,0.00063865737,0.00030712318,0.0006303386,0.00028701356,0.00028932383,0.0003626127],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037817808,0.0002476874,0.01327431,0.00025442662,0.000068172914,0.00030446568,0.00027182163,0.4463463,0.008066442,0.07220637,0.008458336,0.45012355],"study_design_scores_gemma":[0.00044931096,0.00052197336,0.013008729,0.00013901612,0.00014712436,0.00043142654,0.00045057782,0.8716067,0.012218554,0.017331997,0.083646424,0.000048174086],"about_ca_topic_score_codex":0.062004972,"about_ca_topic_score_gemma":0.09841147,"teacher_disagreement_score":0.062004972,"about_ca_system_score_codex":0.0018611238,"about_ca_system_score_gemma":0.0011393146,"threshold_uncertainty_score":0.123288155},"labels":[],"label_agreement":null},{"id":"W7000805669","doi":"","title":"High Voltage Capacitor Market: Powering the Future | North America Dominate by United States, Canada","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"High voltage; Capacitor; Power (physics); Voltage","score_opus":0.0011551527055958315,"score_gpt":0.14493157468315265,"score_spread":0.14377642197755683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7000805669","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004348833,0.0039341077,0.00055894227,0.029926986,0.0014938285,0.000020855923,0.0027009437,0.00032906345,0.9566865],"genre_scores_gemma":[0.053918887,0.005966589,0.00065427995,0.0038955754,0.00043359032,0.000010603601,0.0016377369,0.00023084527,0.933252],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993705,0.000019217447,0.000005246563,0.00004109955,0.00037374112,0.00019025111],"domain_scores_gemma":[0.9988493,0.000034047516,0.000026072717,0.000021733897,0.0008091885,0.00025963556],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003875753,0.0005097837,0.00028035155,0.0011269518,0.0034618438,0.0063896044,0.0009104186,0.0016478812,0.15335841],"category_scores_gemma":[0.0010834282,0.00016863988,0.0003216591,0.0025063716,0.00075680163,0.0020407634,0.00080610317,0.0014439237,0.017576776],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018320194,0.00001956993,0.0005071796,0.000030377985,0.0000024734168,0.00003147156,0.000022849827,0.00041860837,0.00013077521,0.022687418,0.9391482,0.036982805],"study_design_scores_gemma":[0.000012843669,0.000008429015,0.0025280789,0.00010855005,0.0000067286865,0.000036487505,0.00048355176,0.0013818027,0.0002487412,0.00638145,0.98879236,0.000011133038],"about_ca_topic_score_codex":0.8881391,"about_ca_topic_score_gemma":0.9604321,"teacher_disagreement_score":0.15335841,"about_ca_system_score_codex":0.021030758,"about_ca_system_score_gemma":0.048306774,"threshold_uncertainty_score":0.513035},"labels":[],"label_agreement":null},{"id":"W7000977397","doi":"","title":"Hydro Ottawa Applauds Oxford Properties for Investing in Efficiency (CCN)","year":2012,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Work (physics); Productivity; Investment (military)","score_opus":0.013158817815914405,"score_gpt":0.19512937048826418,"score_spread":0.18197055267234977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7000977397","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0061880928,0.0012925147,0.0038103343,0.008608367,0.0013449823,0.0001600224,0.012464585,0.0019688543,0.9641623],"genre_scores_gemma":[0.012212092,0.00030588006,0.0013532438,0.00019409556,0.000048606515,0.000020782432,0.0011835232,0.00041051875,0.98427135],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989079,0.00006175079,0.000029606214,0.0001013238,0.0007447038,0.00015468434],"domain_scores_gemma":[0.9981153,0.00027905297,0.000083844054,0.00021761745,0.0009299735,0.00037412383],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013675342,0.0008165595,0.00048640234,0.0014741844,0.001315971,0.002272854,0.00077154534,0.0017178236,0.26102105],"category_scores_gemma":[0.0037355071,0.000576429,0.00037351137,0.0012991064,0.00066742225,0.0014096206,0.000934385,0.0016516094,0.03611457],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018425654,0.00006534757,0.001403588,0.00016014946,0.000009436521,0.00014985452,0.000100507445,0.001375225,0.00075950834,0.02319044,0.88328815,0.0893134],"study_design_scores_gemma":[0.000017007073,0.000027459899,0.0022199997,0.000036978832,0.000004103018,0.000059963804,0.000083676874,0.0010571958,0.00071596476,0.0016823609,0.9940819,0.000013293424],"about_ca_topic_score_codex":0.17517175,"about_ca_topic_score_gemma":0.4198185,"teacher_disagreement_score":0.26102105,"about_ca_system_score_codex":0.004950078,"about_ca_system_score_gemma":0.0072223595,"threshold_uncertainty_score":0.8732024},"labels":[],"label_agreement":null},{"id":"W7001134191","doi":"","title":"Hydro's second quarter 2024 results: Solid upstream results, mixed markets","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Upstream (networking); Work (physics); Consumption (sociology)","score_opus":0.004542855949835539,"score_gpt":0.2045613793987684,"score_spread":0.20001852344893287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7001134191","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015890656,0.0022657618,0.012899426,0.02887678,0.0045304606,0.00010377455,0.07090179,0.0023486817,0.8621827],"genre_scores_gemma":[0.27062327,0.0032697509,0.017158251,0.007073177,0.0011685677,0.0002276809,0.053664543,0.0032194236,0.64359534],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992878,0.00015529817,0.000013892078,0.000043804273,0.00040220626,0.00009702595],"domain_scores_gemma":[0.998803,0.00020611785,0.00007416684,0.00010819178,0.0006228238,0.00018567625],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018262229,0.00096273015,0.0005277422,0.00079916924,0.0005924846,0.0027228324,0.0007627044,0.00094874157,0.10197218],"category_scores_gemma":[0.0038558582,0.00020853784,0.00048846507,0.0012781292,0.00036198893,0.0018965582,0.00084436353,0.0013477588,0.017010279],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015725062,0.00006289164,0.0003919277,0.00008824065,0.00001943962,0.000031349955,0.000009866188,0.005769322,0.00012672973,0.016353115,0.94032085,0.036669016],"study_design_scores_gemma":[0.00044717803,0.0002010543,0.0056668455,0.0002292469,0.00006568517,0.000065285225,0.00022481782,0.035939477,0.0024936309,0.091057934,0.8635521,0.000056810328],"about_ca_topic_score_codex":0.038542427,"about_ca_topic_score_gemma":0.05652836,"teacher_disagreement_score":0.10197218,"about_ca_system_score_codex":0.0019512447,"about_ca_system_score_gemma":0.0029703518,"threshold_uncertainty_score":0.3411309},"labels":[],"label_agreement":null},{"id":"W7002416728","doi":"","title":"900 MW Cascade Power Project in Alberta Closes Financing and Commences Construction","year":2020,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Cascade; Work (physics); Government (linguistics); Agency (philosophy)","score_opus":0.005640170142418832,"score_gpt":0.19981037700325222,"score_spread":0.1941702068608334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7002416728","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09152015,0.0005496532,0.006651356,0.0041154996,0.00038849903,0.0001731276,0.0040084035,0.001096674,0.89149666],"genre_scores_gemma":[0.26322082,0.00046814998,0.0048197536,0.0003670054,0.00004035572,0.000049379458,0.0035762126,0.0002172259,0.72724116],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995395,0.000025748013,0.0000028928557,0.000025711526,0.0002548249,0.00015138967],"domain_scores_gemma":[0.9994524,0.00003097892,0.000013106759,0.000025695144,0.00027879118,0.00019895066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052585645,0.0005037049,0.00017486702,0.00067655434,0.0020906983,0.001434301,0.00079533574,0.0008894196,0.041743793],"category_scores_gemma":[0.0008293474,0.00022653003,0.0002774992,0.00064293854,0.00060212734,0.0003905858,0.0007674525,0.0010954307,0.0037368827],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00063024065,0.00030363348,0.015791737,0.0001687621,0.000037866805,0.0010124771,0.000279407,0.033025824,0.0069227275,0.06869085,0.5159319,0.35720462],"study_design_scores_gemma":[0.00010417974,0.00017591828,0.048582662,0.00009360715,0.000023575369,0.00017971227,0.0010288468,0.020978399,0.0039815684,0.008925352,0.91588527,0.00004098162],"about_ca_topic_score_codex":0.82049525,"about_ca_topic_score_gemma":0.9496267,"teacher_disagreement_score":0.17950475,"about_ca_system_score_codex":0.012148463,"about_ca_system_score_gemma":0.03504767,"threshold_uncertainty_score":0.36112374},"labels":[],"label_agreement":null},{"id":"W7006570234","doi":"","title":"US$1.6 billion Northern Pass transmission line will deliver Canadian hydropower to the U.S.","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Line (geometry); Government (linguistics); Mains electricity; Electricity","score_opus":0.0036142116610798835,"score_gpt":0.17846897007408025,"score_spread":0.17485475841300036,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7006570234","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0038362986,0.00068796653,0.0026595106,0.0055298517,0.00082254445,0.0001266862,0.016610002,0.001625958,0.96810114],"genre_scores_gemma":[0.01804767,0.0009766355,0.0017593561,0.00055345916,0.00010069787,0.000033090455,0.006755557,0.0004672046,0.9713064],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999546,0.000015350006,0.000004796209,0.000024768113,0.00032233683,0.00008677466],"domain_scores_gemma":[0.99931085,0.000021782731,0.000012978365,0.00002868933,0.00049851375,0.00012708838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047431278,0.00086727296,0.00024399493,0.0013853784,0.0018746832,0.0015464688,0.00059278397,0.0011454218,0.23201464],"category_scores_gemma":[0.0015461271,0.000255385,0.000412904,0.0014213686,0.00049046054,0.0008643389,0.00069331337,0.0010365681,0.062481392],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003985594,0.000032528445,0.0005479756,0.000043642056,0.0000050419953,0.00002658084,0.00002287955,0.0007166544,0.00061562774,0.0072525884,0.9437129,0.046983786],"study_design_scores_gemma":[0.000020935466,0.00002255477,0.0019551779,0.000036718364,0.0000058314927,0.000021932312,0.00009206677,0.001446606,0.00065634283,0.0019546752,0.99377584,0.00001135219],"about_ca_topic_score_codex":0.62649715,"about_ca_topic_score_gemma":0.8421296,"teacher_disagreement_score":0.37350285,"about_ca_system_score_codex":0.00699874,"about_ca_system_score_gemma":0.015681693,"threshold_uncertainty_score":0.7761663},"labels":[],"label_agreement":null},{"id":"W7007831611","doi":"","title":"ABB Ltd. (ABB) to Upgrade Hydro-Quebec's Transmission Grid","year":2016,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transmission (telecommunications); Upgrade; Grid; Noise (video)","score_opus":0.003258601084799837,"score_gpt":0.198061224656112,"score_spread":0.19480262357131217,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7007831611","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010542938,0.0015785131,0.018857613,0.004191586,0.0008710712,0.0002883516,0.015542199,0.0053077163,0.94282013],"genre_scores_gemma":[0.054609437,0.00077480206,0.008761891,0.00050980214,0.000063503256,0.00005388434,0.0060753315,0.0011679274,0.9279834],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995734,0.000036361027,0.0000059805266,0.00004429289,0.00025055945,0.000089420195],"domain_scores_gemma":[0.99898,0.000042680607,0.000022359147,0.00006764646,0.00074315973,0.00014420527],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007184483,0.00086351606,0.00033759186,0.00086022867,0.0013637695,0.0014176064,0.00076779706,0.00090011896,0.20159942],"category_scores_gemma":[0.0011427292,0.00029473897,0.0003337923,0.0010297779,0.00039421485,0.0007819522,0.0005760062,0.0011085743,0.032749258],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019344281,0.00006683739,0.0012515684,0.0001352289,0.000017753722,0.00013179822,0.00005798997,0.0063993395,0.0027668355,0.010073501,0.82564193,0.15326379],"study_design_scores_gemma":[0.000077435834,0.00005252579,0.0042686537,0.00007596496,0.000012451506,0.000081136124,0.00008632679,0.015833775,0.0024434158,0.002091802,0.9749512,0.000025202246],"about_ca_topic_score_codex":0.7671067,"about_ca_topic_score_gemma":0.8917384,"teacher_disagreement_score":0.23289329,"about_ca_system_score_codex":0.008932019,"about_ca_system_score_gemma":0.0098581845,"threshold_uncertainty_score":0.67441726},"labels":[],"label_agreement":null},{"id":"W7008085579","doi":"","title":"Allianz Global Investors Closes First Infrastructure Debt Renewable Energy Project in the US with a $400 Million Investment in Grande Prairie Wind","year":2016,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Renewable energy; Investment (military); Debt; Wind power; Government (linguistics); Boom","score_opus":0.00468861833421283,"score_gpt":0.1985817634844606,"score_spread":0.19389314515024778,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008085579","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018459396,0.0014741903,0.0044204793,0.014033466,0.0013674471,0.00011594515,0.007142663,0.0017246746,0.9512618],"genre_scores_gemma":[0.05659401,0.00086751994,0.0030861998,0.0006729045,0.000173673,0.00002667299,0.0033274535,0.00061620394,0.9346353],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997061,0.000018978368,0.000003821221,0.000034327746,0.00018235095,0.000054441254],"domain_scores_gemma":[0.9995141,0.000037770664,0.000036559006,0.00004877243,0.00018215935,0.00018064989],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000778764,0.0005298018,0.00024425122,0.00065742177,0.000951901,0.0019296859,0.0004763996,0.00095138326,0.089204304],"category_scores_gemma":[0.0014709661,0.00020474201,0.00027099412,0.0004701797,0.00043101725,0.0010002223,0.0009931902,0.0017843881,0.013985144],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002614492,0.00021246044,0.0038011442,0.00012471099,0.00002727753,0.00035402796,0.00012363032,0.002483522,0.0017658868,0.050873548,0.773147,0.16682547],"study_design_scores_gemma":[0.000040602656,0.000046646186,0.005388022,0.00003270284,0.000007250265,0.00007226363,0.000108221306,0.0016115488,0.0015434527,0.0053326697,0.9858063,0.000010287727],"about_ca_topic_score_codex":0.02674984,"about_ca_topic_score_gemma":0.08727154,"teacher_disagreement_score":0.97325015,"about_ca_system_score_codex":0.0017263063,"about_ca_system_score_gemma":0.0024267826,"threshold_uncertainty_score":0.29841816},"labels":[],"label_agreement":null},{"id":"W7008357816","doi":"","title":"The Canada Data Center Colocation Market to Soar with $1.85 Billion Investment by 2029, Adding Over 960 MW Power Capacity – Arizton","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Soar; Investment (military); Power (physics); Center (category theory); Data center; Power market","score_opus":0.006602252305307879,"score_gpt":0.18488882555523858,"score_spread":0.1782865732499307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008357816","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0042944304,0.0014538695,0.004213084,0.030600961,0.003252815,0.000219905,0.02955243,0.0031597752,0.92325276],"genre_scores_gemma":[0.017220443,0.0009284684,0.002220848,0.0035944402,0.0001481698,0.00003242042,0.009331896,0.0007413508,0.9657819],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990319,0.000024158913,0.000009245778,0.000051632927,0.0006565367,0.00022648984],"domain_scores_gemma":[0.9981493,0.000043943048,0.000018538765,0.000049670114,0.0011866513,0.0005519491],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064364204,0.0010616558,0.00033966446,0.0013224304,0.0042482084,0.004574427,0.0009788059,0.0019952357,0.24458158],"category_scores_gemma":[0.0015743797,0.0004980338,0.0007327016,0.0013828909,0.0010020793,0.0017898908,0.001451921,0.002901804,0.06020204],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029895245,0.000016218244,0.00037816225,0.000021388369,0.0000045271295,0.000031596457,0.000014157653,0.00028841494,0.00032936857,0.005558843,0.9802725,0.013055018],"study_design_scores_gemma":[0.000018053717,0.0000093053895,0.0014803031,0.00002892414,0.0000038377707,0.000020949192,0.00012851846,0.00103782,0.0003638428,0.001402917,0.99549013,0.000015433654],"about_ca_topic_score_codex":0.90218323,"about_ca_topic_score_gemma":0.9677452,"teacher_disagreement_score":0.24458158,"about_ca_system_score_codex":0.021697775,"about_ca_system_score_gemma":0.051657867,"threshold_uncertainty_score":0.8182069},"labels":[],"label_agreement":null},{"id":"W7008372160","doi":"","title":"Canada Invests Over $960-Million in Renewable Energy and Grid Modernization Projects","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Modernization theory; Renewable energy; Grid; Energy (signal processing); Government (linguistics); Power grid","score_opus":0.005220698144050021,"score_gpt":0.1666185869522394,"score_spread":0.1613978888081894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008372160","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0062884977,0.0017547115,0.0014052452,0.014047073,0.0019853832,0.00020663303,0.026110321,0.0013421098,0.94686013],"genre_scores_gemma":[0.014191359,0.0012407156,0.00110274,0.0021630812,0.00008959301,0.000029796303,0.005088032,0.0002492928,0.9758455],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985672,0.000037357233,0.000017179189,0.00006252223,0.0009298632,0.00038585722],"domain_scores_gemma":[0.99810743,0.00005439755,0.00003075124,0.000038925296,0.0011150823,0.0006533857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008357466,0.0011341885,0.00046422897,0.0022392632,0.0032164503,0.0037366624,0.0009898202,0.0021626295,0.15013461],"category_scores_gemma":[0.0017282664,0.0004413299,0.0008572927,0.0019127696,0.00084893056,0.0007906669,0.0012078403,0.0015161183,0.031839132],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055228684,0.00006167989,0.0009488115,0.00008252816,0.0000124915605,0.000047296126,0.000022087776,0.00055325474,0.00033708985,0.008539552,0.9433089,0.04603105],"study_design_scores_gemma":[0.000032904565,0.00002028611,0.003032852,0.00006024757,0.0000092695,0.000020145297,0.000095379466,0.00082904595,0.00039471663,0.00096461264,0.9945261,0.000014472963],"about_ca_topic_score_codex":0.9726777,"about_ca_topic_score_gemma":0.98892856,"teacher_disagreement_score":0.15013461,"about_ca_system_score_codex":0.030535942,"about_ca_system_score_gemma":0.094348215,"threshold_uncertainty_score":0.5022503},"labels":[],"label_agreement":null},{"id":"W7008387150","doi":"","title":"Canadian Solar Secures US$50 Million Long-Term Financing for a 100.1 MWp Solar Power Project in Argentina","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Solar energy; Solar power; Renewable energy; Power (physics); Work (physics)","score_opus":0.007745156481251537,"score_gpt":0.2202003556546295,"score_spread":0.21245519917337796,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008387150","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0798549,0.0027941682,0.0038980672,0.009233533,0.0005895127,0.00022675021,0.0106169125,0.0012470431,0.89153916],"genre_scores_gemma":[0.3235606,0.0031208661,0.002806775,0.00046735173,0.00014510461,0.00007997909,0.0068182857,0.00042002668,0.662581],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99948525,0.000026708747,0.000006607865,0.000031784002,0.0002676524,0.00018201394],"domain_scores_gemma":[0.99947006,0.000027971048,0.000025819918,0.000031977954,0.00027955035,0.00016460063],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045638223,0.0003986337,0.0002543627,0.0007904793,0.0018491686,0.0017644815,0.00063959695,0.0007701357,0.03807312],"category_scores_gemma":[0.0015554848,0.00017195824,0.00030247465,0.0011384077,0.00034608497,0.0005412713,0.0007528781,0.000899422,0.0033651665],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054767524,0.00018608723,0.015894383,0.00027064056,0.00006782796,0.0010310995,0.00035897468,0.0049602566,0.0040650987,0.07909301,0.6843223,0.20920274],"study_design_scores_gemma":[0.000108904605,0.0000668328,0.02279941,0.00010017714,0.000028268685,0.0002056621,0.0005060342,0.0039423704,0.0022522015,0.0027852685,0.9671788,0.000025940903],"about_ca_topic_score_codex":0.75772744,"about_ca_topic_score_gemma":0.86837727,"teacher_disagreement_score":0.75772744,"about_ca_system_score_codex":0.00923235,"about_ca_system_score_gemma":0.016844867,"threshold_uncertainty_score":0.48739868},"labels":[],"label_agreement":null},{"id":"W7008465772","doi":"","title":"Canada Invests Over $960-Million in Renewable Energy and Grid Modernization Projects","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Modernization theory; Renewable energy; Grid; Energy (signal processing); Government (linguistics); Power grid","score_opus":0.005220698144050021,"score_gpt":0.1666185869522394,"score_spread":0.1613978888081894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008465772","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0062884977,0.0017547115,0.0014052452,0.014047073,0.0019853832,0.00020663303,0.026110321,0.0013421098,0.94686013],"genre_scores_gemma":[0.014191359,0.0012407156,0.00110274,0.0021630812,0.00008959301,0.000029796303,0.005088032,0.0002492928,0.9758455],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985672,0.000037357233,0.000017179189,0.00006252223,0.0009298632,0.00038585722],"domain_scores_gemma":[0.99810743,0.00005439755,0.00003075124,0.000038925296,0.0011150823,0.0006533857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008357466,0.0011341885,0.00046422897,0.0022392632,0.0032164503,0.0037366624,0.0009898202,0.0021626295,0.15013461],"category_scores_gemma":[0.0017282664,0.0004413299,0.0008572927,0.0019127696,0.00084893056,0.0007906669,0.0012078403,0.0015161183,0.031839132],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055228684,0.00006167989,0.0009488115,0.00008252816,0.0000124915605,0.000047296126,0.000022087776,0.00055325474,0.00033708985,0.008539552,0.9433089,0.04603105],"study_design_scores_gemma":[0.000032904565,0.00002028611,0.003032852,0.00006024757,0.0000092695,0.000020145297,0.000095379466,0.00082904595,0.00039471663,0.00096461264,0.9945261,0.000014472963],"about_ca_topic_score_codex":0.9726777,"about_ca_topic_score_gemma":0.98892856,"teacher_disagreement_score":0.15013461,"about_ca_system_score_codex":0.030535942,"about_ca_system_score_gemma":0.094348215,"threshold_uncertainty_score":0.5022503},"labels":[],"label_agreement":null},{"id":"W7008524638","doi":"","title":"Canadian Solar Acquires 47.5 MWp Portfolio in Chile","year":2020,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Portfolio; Government (linguistics); Work (physics); Investment (military)","score_opus":0.0029384339325885162,"score_gpt":0.16189548636855014,"score_spread":0.15895705243596162,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008524638","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28778324,0.001961318,0.0013986728,0.0104211215,0.00023502998,0.00007810353,0.013334939,0.0006447894,0.68414277],"genre_scores_gemma":[0.6550559,0.0013848275,0.00057697925,0.0005699248,0.00005697729,0.00002010485,0.006156239,0.000111882786,0.33606717],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998616,0.000009213997,0.0000023347166,0.000013506898,0.00006276246,0.00005048837],"domain_scores_gemma":[0.99975234,0.000012069294,0.000013434782,0.000009955823,0.00011815569,0.00009400969],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024031455,0.00026235735,0.00015516557,0.00049217505,0.00074415514,0.0015557937,0.00038887045,0.00042792852,0.027167926],"category_scores_gemma":[0.0007180722,0.00009271976,0.00017520197,0.00073934253,0.00026887195,0.00048762927,0.0005580766,0.0005727048,0.0023973407],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009752653,0.0002878976,0.057215717,0.00029176206,0.00011347762,0.0015135038,0.00032346594,0.024619758,0.0037637302,0.059601624,0.6381133,0.21318048],"study_design_scores_gemma":[0.00023827032,0.00012525132,0.11761708,0.00011743874,0.00006691956,0.00025124586,0.0021595152,0.022058617,0.0035553048,0.0072593056,0.846493,0.000058097154],"about_ca_topic_score_codex":0.68909836,"about_ca_topic_score_gemma":0.81335354,"teacher_disagreement_score":0.31090164,"about_ca_system_score_codex":0.010137367,"about_ca_system_score_gemma":0.008678032,"threshold_uncertainty_score":0.62546515},"labels":[],"label_agreement":null},{"id":"W7008586805","doi":"","title":"Canada’s Leading Renewable Energy Stock Combines Growth With High Yield","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Stock (firearms); Renewable energy; Yield (engineering); Energy consumption; Work (physics)","score_opus":0.0043814032454028585,"score_gpt":0.15138808799765152,"score_spread":0.14700668475224865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008586805","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016828613,0.002262518,0.0069914972,0.010515522,0.0006929078,0.00009866009,0.0108140595,0.0012822065,0.9505141],"genre_scores_gemma":[0.25279704,0.003998484,0.010867664,0.0016296318,0.00022263522,0.000043115007,0.0068346947,0.0008303275,0.7227764],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994537,0.000021631133,0.0000058056894,0.00002898162,0.00039135,0.000098449156],"domain_scores_gemma":[0.9990107,0.000047844445,0.000025083558,0.000035263685,0.00070785277,0.00017315614],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052091037,0.000642612,0.0002381272,0.0011951375,0.0014936123,0.003034615,0.00064406695,0.0005858503,0.04193701],"category_scores_gemma":[0.0016815996,0.00018762937,0.0003480857,0.0015802039,0.00055629294,0.0006189818,0.0006721187,0.0008094566,0.004261293],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000097734046,0.00007921064,0.0041141273,0.00018990827,0.00003414695,0.00009132491,0.00006136447,0.009764801,0.001249469,0.09611063,0.709206,0.17900127],"study_design_scores_gemma":[0.000053169057,0.00003753819,0.009539044,0.00016830348,0.00003378548,0.000059868296,0.00024297727,0.018157959,0.0031543397,0.020671511,0.9478484,0.000033107564],"about_ca_topic_score_codex":0.9095143,"about_ca_topic_score_gemma":0.96943766,"teacher_disagreement_score":0.09048569,"about_ca_system_score_codex":0.019367998,"about_ca_system_score_gemma":0.0435251,"threshold_uncertainty_score":0.18203712},"labels":[],"label_agreement":null},{"id":"W7009347679","doi":"","title":"Earnings of French utility Engie in the third quarter jump 18%","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Earnings; Quarter (Canadian coin); Jump; Term (time); Work (physics)","score_opus":0.008666308176339791,"score_gpt":0.21477034180665544,"score_spread":0.20610403363031565,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7009347679","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46476763,0.007905133,0.0011968522,0.015302625,0.0024274066,0.00004829966,0.079515845,0.0018482838,0.4269879],"genre_scores_gemma":[0.4307357,0.001705729,0.0003163094,0.0007938477,0.00027222416,0.000027288996,0.024379814,0.00019880061,0.5415702],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999671,0.000026574517,0.000008802562,0.000032867887,0.0001239084,0.00013688112],"domain_scores_gemma":[0.9996835,0.000039541956,0.000042310043,0.000015832,0.00013718472,0.00008166759],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003474619,0.0004806675,0.0002937655,0.0009931538,0.0007527715,0.0019783813,0.00028643623,0.000940106,0.026957095],"category_scores_gemma":[0.0011395867,0.00012821134,0.00047990345,0.00075999065,0.00014406494,0.00040908362,0.00040973283,0.00093090656,0.00852743],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010802597,0.0002196544,0.049625304,0.00008266961,0.00007117343,0.000535513,0.00020984292,0.0035980388,0.0012387199,0.017814001,0.78378195,0.14174293],"study_design_scores_gemma":[0.00009744376,0.0001744805,0.26368994,0.000090491514,0.000035100704,0.00022074881,0.00077664165,0.0050622947,0.0028265696,0.0019847783,0.72499686,0.00004466784],"about_ca_topic_score_codex":0.28501534,"about_ca_topic_score_gemma":0.2512934,"teacher_disagreement_score":0.28501534,"about_ca_system_score_codex":0.0033858872,"about_ca_system_score_gemma":0.0018258361,"threshold_uncertainty_score":0.56671274},"labels":[],"label_agreement":null},{"id":"W7010416249","doi":"","title":"IBM and Hydro One Partner Up to Provide Help with Ontario's Power Grid","year":2012,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"IBM; Power grid; Power (physics); Grid; Automation","score_opus":0.006663416380564474,"score_gpt":0.18138552567924437,"score_spread":0.1747221092986799,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7010416249","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004574621,0.00025664395,0.003145637,0.003624733,0.00023540127,0.00012443482,0.0055982065,0.0018815855,0.9805587],"genre_scores_gemma":[0.011089135,0.00017659728,0.0013474282,0.00012321907,0.000025281064,0.000017246553,0.0014172983,0.0004177228,0.98538613],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993839,0.000030760868,0.000010811311,0.00005208095,0.0003619233,0.00016038453],"domain_scores_gemma":[0.9981078,0.00010423611,0.000040970303,0.00012246448,0.0011741951,0.0004503588],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00054992875,0.00078174594,0.0004642894,0.0013969018,0.0032586805,0.0023956355,0.0006121723,0.001242589,0.3829251],"category_scores_gemma":[0.0012897988,0.000504642,0.00042553683,0.0021249996,0.000529484,0.0011065792,0.0007317422,0.0010741645,0.08354486],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009676071,0.000072735405,0.0016227404,0.00007850798,0.0000083839,0.00012531778,0.00013828684,0.0012954443,0.0011968911,0.008126248,0.9196863,0.067552425],"study_design_scores_gemma":[0.00003873603,0.000027356697,0.0033292433,0.000024189054,0.00000870835,0.000055754143,0.00023959433,0.0027789106,0.00085057854,0.0012078644,0.9914232,0.000015996895],"about_ca_topic_score_codex":0.7015134,"about_ca_topic_score_gemma":0.913774,"teacher_disagreement_score":0.3829251,"about_ca_system_score_codex":0.009357786,"about_ca_system_score_gemma":0.017655436,"threshold_uncertainty_score":0.88018245},"labels":[],"label_agreement":null},{"id":"W7010809019","doi":"","title":"Is there a Bearish outlook for Power Corporation of Canada (TSE:POW) this week?","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Corporation; Power (physics); Work (physics); Government (linguistics)","score_opus":0.009437457420318393,"score_gpt":0.19890638645054376,"score_spread":0.18946892903022536,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7010809019","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016192286,0.0024306376,0.0017769312,0.061232127,0.013519592,0.000089238194,0.0064072614,0.0016768824,0.9112481],"genre_scores_gemma":[0.0027663049,0.0010851267,0.0004164931,0.001978544,0.0004011321,0.000013130708,0.0011786579,0.00038175713,0.9917788],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99888605,0.000030176874,0.000012510812,0.000027509917,0.0007855066,0.00025824687],"domain_scores_gemma":[0.9974681,0.000100046316,0.000042129002,0.00009585989,0.0014128067,0.00088105816],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0013093138,0.0007531712,0.0005585276,0.0010510534,0.0038543474,0.008790365,0.0009805738,0.003267016,0.35344034],"category_scores_gemma":[0.0032827132,0.00040349696,0.0006936332,0.0014097691,0.0012557392,0.0027144072,0.0013911367,0.0030440225,0.118294455],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000117054,0.0000150204305,0.000096350894,0.000012346446,0.0000011584368,0.000014247881,0.0000101739415,0.000109362016,0.00003470975,0.0021469174,0.9874423,0.010105666],"study_design_scores_gemma":[0.000007500807,0.000008963586,0.0005648968,0.000051313986,0.000001746036,0.000010294008,0.0001330793,0.00024947614,0.00008615492,0.0013948322,0.9974827,0.000009062338],"about_ca_topic_score_codex":0.44520113,"about_ca_topic_score_gemma":0.8090443,"teacher_disagreement_score":0.55479884,"about_ca_system_score_codex":0.008557615,"about_ca_system_score_gemma":0.028675597,"threshold_uncertainty_score":0.9222389},"labels":[],"label_agreement":null},{"id":"W7011427647","doi":"","title":"Massachusetts Gov. Charlie Baker's proposal to authorize long-term contracts between utilities and Canadian hydropower producers is being viewed by some as a potential game-changer in energy-starved New England","year":2016,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"New england; Hydropower; Payment; West virginia; Legislation","score_opus":0.005212801717346964,"score_gpt":0.20788815093670363,"score_spread":0.20267534921935665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7011427647","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008886627,0.0007376142,0.00045721192,0.011146003,0.0005281608,0.000036755617,0.003229945,0.00046535672,0.98251027],"genre_scores_gemma":[0.0042862413,0.00022590629,0.00015196964,0.0017909593,0.0000386985,0.000021829172,0.00053885824,0.00006740712,0.992878],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99966407,0.000022445241,0.000007975243,0.0000540879,0.00017217646,0.000079268386],"domain_scores_gemma":[0.9994822,0.00007011542,0.000023467052,0.000044973433,0.00025701412,0.00012228917],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00035354408,0.00044498697,0.00038368773,0.000623706,0.003865197,0.0025092892,0.0010605024,0.0032472722,0.42037225],"category_scores_gemma":[0.0012765882,0.0003600653,0.00031310978,0.0008573311,0.00063800946,0.001347361,0.0013215761,0.0028364786,0.12598725],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022935874,0.000021475484,0.00031554984,0.000028709788,0.0000033488423,0.00010269454,0.000057207693,0.000065994835,0.00019609291,0.030843753,0.95227,0.016072184],"study_design_scores_gemma":[0.000010141251,0.0000042737834,0.00065296347,0.00002485281,0.000002746741,0.000020015095,0.000052176678,0.00006722256,0.000100145546,0.0015530571,0.9975077,0.0000046276064],"about_ca_topic_score_codex":0.32733682,"about_ca_topic_score_gemma":0.63441324,"teacher_disagreement_score":0.6726632,"about_ca_system_score_codex":0.0041002347,"about_ca_system_score_gemma":0.00613815,"threshold_uncertainty_score":0.82676864},"labels":[],"label_agreement":null},{"id":"W7014411465","doi":"","title":"Power Corporation Reports Third Quarter Financial Results","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Corporation; Quarter (Canadian coin); Power (physics); Work (physics)","score_opus":0.0045309214132858286,"score_gpt":0.1874041135939103,"score_spread":0.18287319218062448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7014411465","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0021807617,0.00053737545,0.0015206445,0.0037959055,0.0018628377,0.00014149891,0.016064309,0.0015752118,0.97232157],"genre_scores_gemma":[0.01049522,0.00073064,0.0010162484,0.0005173363,0.00036346237,0.000084102125,0.013560385,0.0009559092,0.9722767],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99725807,0.00019554207,0.00008036656,0.00018115515,0.0019347675,0.00035007228],"domain_scores_gemma":[0.99518293,0.00055477646,0.00019688971,0.00055470265,0.002893752,0.0006169547],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.002357641,0.0016914046,0.000863025,0.0040891394,0.0015588098,0.00580778,0.0014932631,0.0019956706,0.42616457],"category_scores_gemma":[0.0077120573,0.00047157946,0.0009270408,0.0030172623,0.00071040285,0.0022429333,0.001108039,0.0023777876,0.2811773],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010388231,0.00018065672,0.00029629012,0.00004901609,0.0000080494165,0.00004201955,0.000008379285,0.00059162,0.00012578443,0.004011528,0.95921284,0.035369944],"study_design_scores_gemma":[0.00012810016,0.000115081915,0.0018196236,0.00008925042,0.000020422485,0.000060191258,0.00006993184,0.0031677515,0.0017970896,0.0051897014,0.98752046,0.000022496399],"about_ca_topic_score_codex":0.013584565,"about_ca_topic_score_gemma":0.018182434,"teacher_disagreement_score":0.42616457,"about_ca_system_score_codex":0.0026382029,"about_ca_system_score_gemma":0.0036809912,"threshold_uncertainty_score":0.8185066},"labels":[],"label_agreement":null},{"id":"W7014411625","doi":"","title":"Presidential Permit Paves Way for Minnesota Powers Great NorthernTransmission Line to Deliver Canadian Hydropower to Customers","year":2016,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Presidential system; Hydropower; Line (geometry); Government (linguistics)","score_opus":0.004670088815836373,"score_gpt":0.2149955529580797,"score_spread":0.21032546414224335,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7014411625","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002704013,0.00018616099,0.0009876875,0.0022532044,0.00070446293,0.000094666255,0.0038858496,0.0006222199,0.98856175],"genre_scores_gemma":[0.0036678507,0.00008994942,0.0003699425,0.00015689536,0.00004488946,0.000011821716,0.00077538216,0.00013920561,0.99474406],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99951696,0.000023215325,0.000008208673,0.000046120116,0.00032100626,0.00008445552],"domain_scores_gemma":[0.9992374,0.00003794674,0.000019112926,0.00006108343,0.00047463627,0.0001697623],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00061870576,0.00079285604,0.00034066034,0.001032957,0.002618924,0.0025093441,0.0005428867,0.001332821,0.34081993],"category_scores_gemma":[0.0012928889,0.00043758668,0.0003382465,0.00063476973,0.00056206505,0.0010144308,0.000659565,0.0017716612,0.09477792],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004041405,0.00006054088,0.00050775346,0.000024085128,0.000003697916,0.000054204567,0.000033003205,0.0005238495,0.00036547525,0.007678797,0.96832687,0.022381237],"study_design_scores_gemma":[0.000017333545,0.00002292853,0.0020735862,0.000021661888,0.0000038961643,0.000025626945,0.00007641597,0.0011412798,0.0005269615,0.00085044483,0.99523145,0.000008399005],"about_ca_topic_score_codex":0.2930563,"about_ca_topic_score_gemma":0.62730354,"teacher_disagreement_score":0.7069437,"about_ca_system_score_codex":0.004386085,"about_ca_system_score_gemma":0.008845808,"threshold_uncertainty_score":0.9402404},"labels":[],"label_agreement":null},{"id":"W7014688947","doi":"","title":"Power Co. of Canada (POW) Earns “Sector Perform” Rating from Scotiabank","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Production (economics); Work (physics); Investment (military); Context (archaeology)","score_opus":0.004044504420698089,"score_gpt":0.1786736385721032,"score_spread":0.1746291341514051,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7014688947","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0040326933,0.0006008941,0.0019196803,0.0044609206,0.0010421784,0.000098716504,0.009355208,0.0013521434,0.9771375],"genre_scores_gemma":[0.015687276,0.00044694133,0.00076712656,0.00025726162,0.00007826067,0.000010574525,0.0044289497,0.00036810522,0.9779555],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985826,0.00004785049,0.00002207028,0.00008663251,0.0009777568,0.00028313586],"domain_scores_gemma":[0.99377066,0.00019429786,0.00008310932,0.00025466617,0.0043421513,0.0013550944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011092811,0.000789948,0.0005685195,0.0019438567,0.0026304177,0.0032262756,0.00084530504,0.001255023,0.28763303],"category_scores_gemma":[0.0028113532,0.0003963114,0.0003753139,0.0020096076,0.00082350505,0.00089870836,0.00079090986,0.0013084257,0.084803365],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008040091,0.00004752615,0.0013184241,0.00007748172,0.000005570024,0.0000884934,0.00003607044,0.0006207668,0.00051487924,0.006105116,0.94641894,0.044686213],"study_design_scores_gemma":[0.000019972607,0.00003956799,0.0044164774,0.000067443376,0.0000061026108,0.000071627524,0.00015700326,0.0018271578,0.0009849707,0.0010726167,0.9913224,0.000014529564],"about_ca_topic_score_codex":0.4908055,"about_ca_topic_score_gemma":0.8267133,"teacher_disagreement_score":0.5091945,"about_ca_system_score_codex":0.0068679717,"about_ca_system_score_gemma":0.018046545,"threshold_uncertainty_score":0.97589743},"labels":[],"label_agreement":null},{"id":"W7014847120","doi":"","title":"Quebec premier pushes for long-term hydroelectric power contracts with Massachusetts","year":2015,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydroelectricity; Power (physics); Work (physics); Hydro power; Electric power industry","score_opus":0.006242133703631873,"score_gpt":0.2015604314784329,"score_spread":0.195318297774801,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7014847120","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024900412,0.00473284,0.0031668872,0.041366912,0.002669014,0.00025084952,0.010214545,0.00078484433,0.91191363],"genre_scores_gemma":[0.04901783,0.00077645056,0.00125255,0.002897883,0.00018801288,0.00004828032,0.0011459698,0.00015428527,0.94451874],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99857426,0.00009131485,0.000021125976,0.000104729734,0.00083429884,0.0003742566],"domain_scores_gemma":[0.9981681,0.00018118392,0.000057026507,0.00010305252,0.0010226758,0.00046787047],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014532683,0.00044401494,0.00038927232,0.00102811,0.0040436815,0.0036861976,0.0010839538,0.0026826195,0.104101405],"category_scores_gemma":[0.0038324143,0.0003698286,0.000652727,0.0009410779,0.00056019233,0.0008685345,0.00095885893,0.0029067628,0.0073851966],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000092756105,0.0000661684,0.0029533927,0.000048285212,0.000021042368,0.00025266246,0.00013309678,0.0011339303,0.0005614604,0.04751547,0.9155867,0.0316351],"study_design_scores_gemma":[0.00003567042,0.000024781877,0.0099947965,0.0000845565,0.000010345333,0.000057404806,0.00016336149,0.001322106,0.00036757436,0.0015764809,0.98634434,0.000018725206],"about_ca_topic_score_codex":0.8566691,"about_ca_topic_score_gemma":0.9608912,"teacher_disagreement_score":0.14333087,"about_ca_system_score_codex":0.021349289,"about_ca_system_score_gemma":0.039402995,"threshold_uncertainty_score":0.3482539},"labels":[],"label_agreement":null},{"id":"W7015447539","doi":"","title":"St[r]ategic offers in an oligopolistic electricity market under pay-as-bid pricing","year":2008,"lang":"en","type":"dissertation","venue":"eScholarship@McGill (McGill)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"","keywords":"Oligopoly; Competition (biology); Market competition; Monopoly","score_opus":0.011289101121330958,"score_gpt":0.22669275657891616,"score_spread":0.2154036554575852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7015447539","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46498945,0.0015004248,0.044872925,0.008782892,0.00027098772,0.00013415677,0.00043782045,0.00016630306,0.47884512],"genre_scores_gemma":[0.93996125,0.0007725699,0.002457594,0.00019443949,0.000077726894,0.000029543302,0.00005238316,0.000034751807,0.05641967],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997563,0.00009571516,0.000007536295,0.000031556192,0.000043667904,0.00006529846],"domain_scores_gemma":[0.99955434,0.00021650988,0.00005367655,0.000021686625,0.00006431046,0.00008947163],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058762473,0.00023760175,0.0005763302,0.0002951529,0.00082700985,0.0025776117,0.00060713256,0.0011077067,0.015212532],"category_scores_gemma":[0.0021024933,0.00032009222,0.00037560274,0.000573006,0.0011678893,0.0016364572,0.00069023686,0.0013223409,0.0007794905],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039394485,0.0001635188,0.0010764498,0.000115559196,0.000028676212,0.00047959754,0.0002657273,0.17766519,0.0011598531,0.78865737,0.01320872,0.01678539],"study_design_scores_gemma":[0.00019983691,0.00023786235,0.0025646933,0.00008110769,0.000046556062,0.00018600878,0.00059773243,0.50601006,0.00049486983,0.4670601,0.022459872,0.00006132064],"about_ca_topic_score_codex":0.0106833605,"about_ca_topic_score_gemma":0.0165979,"teacher_disagreement_score":0.015212532,"about_ca_system_score_codex":0.0026317078,"about_ca_system_score_gemma":0.0020790484,"threshold_uncertainty_score":0.050890982},"labels":[],"label_agreement":null},{"id":"W7016171892","doi":"","title":"Wind and sun come through to help Alberta electricity operator end grid alerts","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Grid; Electricity; Operator (biology); Electricity system; Wind power","score_opus":0.006104542775420632,"score_gpt":0.21114503313544924,"score_spread":0.2050404903600286,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7016171892","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001711642,0.00008608851,0.0010816652,0.0026231813,0.0006976719,0.00007615463,0.0026610878,0.002200343,0.9888622],"genre_scores_gemma":[0.0066840476,0.00007568541,0.00079202466,0.00052732776,0.000070714006,0.00001198782,0.0013906837,0.0002790117,0.99016845],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995819,0.00002029066,0.0000048531,0.00002083958,0.00028070237,0.00009138633],"domain_scores_gemma":[0.99842644,0.00010517541,0.00003228141,0.00008275429,0.00091418123,0.00043918565],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0005006839,0.0006752978,0.00024136208,0.00095719454,0.0019179025,0.002629067,0.0007698426,0.001888894,0.45299068],"category_scores_gemma":[0.0015402767,0.00035538134,0.00030518477,0.0006388738,0.00039524856,0.0007864494,0.0009964003,0.0013013973,0.12559102],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003632731,0.000048921887,0.00071823684,0.000012711689,0.000001783418,0.00006188566,0.0000179222,0.00046777207,0.00033829486,0.0013870855,0.96485883,0.03205018],"study_design_scores_gemma":[0.000042697506,0.000023051178,0.0047877417,0.00003480634,0.0000045972133,0.00003421819,0.00018178769,0.0032707106,0.0006902472,0.0016669047,0.98924726,0.000015923622],"about_ca_topic_score_codex":0.40449733,"about_ca_topic_score_gemma":0.7307026,"teacher_disagreement_score":0.5955027,"about_ca_system_score_codex":0.0041452595,"about_ca_system_score_gemma":0.00833598,"threshold_uncertainty_score":0.80428576},"labels":[],"label_agreement":null},{"id":"W7016171903","doi":"","title":"Wind Power Market in Canada, Forecast to 2025 - COVID-19 Impact, Market Opportunities, Key Projects - ResearchAndMarkets.com","year":2020,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Key (lock); Wind power; Power market; Power (physics); Market power; Market research","score_opus":0.03905224989858009,"score_gpt":0.25990932164234637,"score_spread":0.2208570717437663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7016171903","genre_codex":"dataset","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034340367,0.007461353,0.0015534793,0.021418346,0.0015667405,0.000098962875,0.6317145,0.0016672235,0.30017903],"genre_scores_gemma":[0.22784305,0.013910817,0.003017279,0.002450468,0.00032394924,0.00006006307,0.2981077,0.000578892,0.45370778],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995603,0.0000082417955,0.000009465914,0.00002744958,0.00029324903,0.00010133073],"domain_scores_gemma":[0.99902976,0.000023474106,0.000030652584,0.000008086342,0.0007361133,0.00017196157],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004184381,0.00075985986,0.00026256056,0.0013399759,0.0014105377,0.0026533448,0.0006056816,0.00075153226,0.030993177],"category_scores_gemma":[0.0010909245,0.0002406385,0.00039726065,0.002793315,0.00037392392,0.0010525977,0.00043771416,0.0011271858,0.0072937263],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009326092,0.000029666748,0.0067199594,0.0001559054,0.000019734423,0.00007109642,0.00004951312,0.0027032099,0.00016738768,0.004643704,0.96365076,0.021695781],"study_design_scores_gemma":[0.000092746246,0.00004335651,0.09591127,0.00029395,0.000045382974,0.000059029557,0.00072227576,0.01003947,0.0009356151,0.0028798191,0.88891923,0.000057860492],"about_ca_topic_score_codex":0.98665166,"about_ca_topic_score_gemma":0.9943036,"teacher_disagreement_score":0.030993177,"about_ca_system_score_codex":0.02004617,"about_ca_system_score_gemma":0.047985736,"threshold_uncertainty_score":0.14544588},"labels":[],"label_agreement":null},{"id":"W7017099094","doi":"","title":"ABB Wins 85M Orders To Strengthen Power Grid In Canada","year":2016,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power grid; Power (physics); Government (linguistics); Grid; Work (physics)","score_opus":0.0029211799809941187,"score_gpt":0.16530872783899214,"score_spread":0.16238754785799803,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017099094","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0046050893,0.0013208071,0.0017281977,0.011714924,0.0034368117,0.00013350586,0.003042736,0.00088103034,0.97313684],"genre_scores_gemma":[0.0147729665,0.00053096726,0.000635098,0.0009994974,0.00016010972,0.000013000123,0.0007827806,0.00025567628,0.98184997],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9973066,0.00006419155,0.000026998228,0.000093739916,0.0018912668,0.0006172443],"domain_scores_gemma":[0.9966223,0.00014153865,0.000040231283,0.00012018256,0.0021343366,0.00094134355],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017524086,0.00080413226,0.000554578,0.0015256185,0.00516212,0.006398104,0.0011551386,0.0029324035,0.14545894],"category_scores_gemma":[0.0036781994,0.00045402307,0.0006378769,0.0012276828,0.0013233646,0.0013167528,0.0013215609,0.0028620658,0.030750606],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005870614,0.000049354036,0.0006883929,0.00003387873,0.0000067748865,0.00012989831,0.00006111113,0.0009852094,0.00037014048,0.018872835,0.94784397,0.03089975],"study_design_scores_gemma":[0.000016647122,0.000015467404,0.0021804073,0.00003859341,0.000005054852,0.000032590528,0.00013324729,0.0011567897,0.00050787616,0.0016413277,0.99425817,0.000013901765],"about_ca_topic_score_codex":0.8899392,"about_ca_topic_score_gemma":0.95873916,"teacher_disagreement_score":0.14545894,"about_ca_system_score_codex":0.02695971,"about_ca_system_score_gemma":0.07061809,"threshold_uncertainty_score":0.48660862},"labels":[],"label_agreement":null},{"id":"W7017645315","doi":"","title":"Canada Power Market Outlook to 2030 Market Trends Regulations and Competitive Landscape","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Market power; Competition (biology); Market competition; Power market","score_opus":0.0022764754345324014,"score_gpt":0.16795356761133964,"score_spread":0.16567709217680723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017645315","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005134056,0.0031545502,0.0014753528,0.012077552,0.0008735643,0.00010027806,0.06551746,0.000910192,0.91075695],"genre_scores_gemma":[0.039334424,0.0054169903,0.0023622415,0.0019783285,0.0001276503,0.000057070836,0.021862412,0.00053397886,0.928327],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99854505,0.000040003757,0.00001709158,0.00006234496,0.0010898027,0.00024575062],"domain_scores_gemma":[0.9976744,0.000054534732,0.000052382307,0.00003282772,0.0019293838,0.00025652722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00076953607,0.000861785,0.00035224782,0.0030401093,0.0032965357,0.0045246566,0.0011720519,0.0011842004,0.103882074],"category_scores_gemma":[0.0025509659,0.00037243508,0.00064686046,0.0056739096,0.00075359584,0.0012116769,0.0009153988,0.0014368964,0.017844476],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033111548,0.000020716629,0.0012862309,0.000090869,0.000006977843,0.000043044158,0.000047087527,0.0014371717,0.00010607747,0.015146748,0.9523881,0.029393813],"study_design_scores_gemma":[0.000016964766,0.000008746667,0.0067035817,0.00013166598,0.0000091835955,0.000025255238,0.0002308486,0.0019628943,0.00031279065,0.0023534647,0.98822093,0.000023618659],"about_ca_topic_score_codex":0.99181587,"about_ca_topic_score_gemma":0.99571204,"teacher_disagreement_score":0.103882074,"about_ca_system_score_codex":0.06573383,"about_ca_system_score_gemma":0.10129893,"threshold_uncertainty_score":0.47693455},"labels":[],"label_agreement":null},{"id":"W7017704909","doi":"","title":"Canadian Solar Subsidiary Recurrent Energy Inks 100 Megawatt Power Purchase Agreement with Peninsula Clean Energy","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Peninsula; Energy (signal processing); Clean energy; Power (physics); Renewable energy; Solar energy; Electricity generation","score_opus":0.005031103313294286,"score_gpt":0.18344638632998797,"score_spread":0.17841528301669368,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017704909","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029725,0.0002658866,0.0015715349,0.0012661681,0.00022665189,0.00009738661,0.009003076,0.0007587939,0.98383796],"genre_scores_gemma":[0.014781887,0.0002805276,0.0013097093,0.00019285179,0.000032331714,0.000022533384,0.003627117,0.0002889036,0.9794642],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987406,0.000033325956,0.000011082415,0.00007926943,0.0009008737,0.00023476075],"domain_scores_gemma":[0.9982651,0.00007442086,0.000032199365,0.00013693536,0.001313243,0.00017808253],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069382694,0.0008589907,0.0004775315,0.0021198976,0.0038027037,0.002853804,0.0014579729,0.0014140806,0.26096293],"category_scores_gemma":[0.002422864,0.00046639438,0.0005122779,0.00229836,0.0006818667,0.00096596015,0.0007683716,0.0015054009,0.042264987],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008060794,0.0000761831,0.0008889163,0.000047966718,0.000009927526,0.000064105756,0.000049871745,0.0016750935,0.0005060793,0.028183436,0.91061765,0.057800163],"study_design_scores_gemma":[0.000028610844,0.000019188235,0.0034070462,0.00003880243,0.000008615853,0.00003928364,0.00013219897,0.0032079227,0.0014224417,0.002834698,0.98884237,0.000018776554],"about_ca_topic_score_codex":0.8750697,"about_ca_topic_score_gemma":0.95259655,"teacher_disagreement_score":0.8750697,"about_ca_system_score_codex":0.017783146,"about_ca_system_score_gemma":0.034377616,"threshold_uncertainty_score":0.873008},"labels":[],"label_agreement":null},{"id":"W7017805634","doi":"","title":"Canada Wind Power Market Size, Share, Growth, Trends, Opportunities and Forecast 2014-2025","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Power (physics); Market power; Boom; Investment (military)","score_opus":0.0070633950762892875,"score_gpt":0.17016381120214086,"score_spread":0.16310041612585158,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017805634","genre_codex":"dataset","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058139842,0.0036025161,0.0027541905,0.0076206475,0.00050781143,0.00017106727,0.46464676,0.0015869986,0.46097025],"genre_scores_gemma":[0.22481014,0.006855971,0.0038060623,0.00058897265,0.00013625316,0.000086801185,0.17165653,0.00044031127,0.59161896],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99950707,0.00000895627,0.000009124437,0.000032604396,0.00036010137,0.000082108745],"domain_scores_gemma":[0.99816126,0.00005368016,0.00006391448,0.000024672641,0.0015361822,0.00016035125],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032033582,0.00059128925,0.00029891133,0.0023969305,0.001363993,0.0023621484,0.0007868996,0.00040272338,0.036681503],"category_scores_gemma":[0.0018250011,0.000278049,0.0004943548,0.005043576,0.00032794147,0.0008382094,0.00041444725,0.0006709484,0.0063553443],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013448746,0.00003745411,0.021194065,0.00018518747,0.000041922976,0.00008490426,0.00008222058,0.009578778,0.0003544474,0.008448152,0.8988889,0.06096957],"study_design_scores_gemma":[0.00008296669,0.0000339573,0.12721454,0.0002167204,0.000053529526,0.00008222633,0.000765479,0.02581257,0.0017076057,0.0028068179,0.84114903,0.000074436066],"about_ca_topic_score_codex":0.98808134,"about_ca_topic_score_gemma":0.99484926,"teacher_disagreement_score":0.036681503,"about_ca_system_score_codex":0.029765725,"about_ca_system_score_gemma":0.04322084,"threshold_uncertainty_score":0.21596646},"labels":[],"label_agreement":null},{"id":"W7017842766","doi":"","title":"Canadian Energy(TM) Markets Retractable Solar Gensets With PWRstation(TM) in Canada - Energy (ENERGY01) News","year":2015,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Solar energy; Energy (signal processing); Renewable energy; Government (linguistics); Energy consumption","score_opus":0.0026047819482482113,"score_gpt":0.13776401580584116,"score_spread":0.13515923385759296,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017842766","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029388124,0.0019548996,0.0010504517,0.029173402,0.0050833845,0.00009021175,0.00592641,0.001005355,0.95277715],"genre_scores_gemma":[0.010024846,0.00071987393,0.00047239222,0.0039002553,0.00022293106,0.000010962256,0.0016311121,0.00023246337,0.98278505],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986994,0.000021073727,0.000009735451,0.000052620828,0.00088646956,0.00033062045],"domain_scores_gemma":[0.9991211,0.00003329744,0.000012092793,0.00003261681,0.0006204455,0.00018042704],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006096892,0.00068789837,0.00036517013,0.0007264505,0.0053374963,0.005011575,0.0009994003,0.0030747384,0.15519588],"category_scores_gemma":[0.0012103538,0.00040139243,0.00087354117,0.0011607668,0.00093225215,0.001075387,0.0010566984,0.003211918,0.026424332],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026691792,0.000014493072,0.00027705447,0.00001702142,0.0000025223642,0.000040911353,0.000022473077,0.00013970314,0.00014626097,0.004133025,0.98419064,0.01098917],"study_design_scores_gemma":[0.000009665337,0.0000075053154,0.0015872064,0.000026656506,0.0000032267892,0.000014100651,0.000100870646,0.00020063567,0.00022228938,0.00066505815,0.99715364,0.000009183365],"about_ca_topic_score_codex":0.93246996,"about_ca_topic_score_gemma":0.98683316,"teacher_disagreement_score":0.15519588,"about_ca_system_score_codex":0.019213203,"about_ca_system_score_gemma":0.03724304,"threshold_uncertainty_score":0.51918197},"labels":[],"label_agreement":null},{"id":"W7017899859","doi":"","title":"Canadian Exchanges Stock Scanner Innergex Renewable Energy Polaris Infrastructure Transeastern Power Trust and NaiKun Wind Energy Group","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Renewable energy; Stock (firearms); Group (periodic table); Scanner; Power station; Energy (signal processing)","score_opus":0.003109354308114381,"score_gpt":0.16698073415099976,"score_spread":0.16387137984288538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017899859","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013398137,0.0009888122,0.0005079824,0.0025959916,0.0011430209,0.00006793437,0.031648114,0.0008618085,0.9608465],"genre_scores_gemma":[0.004222452,0.00081765006,0.00046841608,0.00017477009,0.00012784026,0.000015424443,0.008139234,0.00035182957,0.9856824],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99884015,0.000022852957,0.000027131651,0.000084177685,0.00084490504,0.0001807841],"domain_scores_gemma":[0.9950086,0.00016244684,0.0001706313,0.00025797627,0.0036497598,0.0007505376],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00077734975,0.0012989345,0.000753931,0.0044732867,0.003467931,0.006821005,0.001104183,0.0012681108,0.45307168],"category_scores_gemma":[0.0042490796,0.00054569077,0.00057391793,0.006145855,0.0007854185,0.0023151813,0.00086356996,0.0016819262,0.15496866],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026892449,0.000014288903,0.0003255413,0.000029026774,0.0000033303156,0.000021028418,0.000014294559,0.00025759314,0.000047737678,0.005411831,0.9729734,0.020875072],"study_design_scores_gemma":[0.000008861643,0.00000544598,0.0012963148,0.000039958162,0.000003421313,0.00001783425,0.000058070287,0.0005846301,0.0002095056,0.0009494331,0.9968154,0.0000111292675],"about_ca_topic_score_codex":0.77500284,"about_ca_topic_score_gemma":0.8837401,"teacher_disagreement_score":0.45307168,"about_ca_system_score_codex":0.016356776,"about_ca_system_score_gemma":0.034004327,"threshold_uncertainty_score":0.78012687},"labels":[],"label_agreement":null},{"id":"W7017922715","doi":"","title":"Caisse DE Depot ET Placement DU Quebec Trims Stake in General Electric (GE)","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Depot; Payment; Work (physics); Electric utility","score_opus":0.005293628025359688,"score_gpt":0.20598899376757066,"score_spread":0.20069536574221097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017922715","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18530917,0.008498569,0.11720288,0.010844319,0.0031960704,0.0005740705,0.015055816,0.002950134,0.656369],"genre_scores_gemma":[0.34875154,0.0015170577,0.029542912,0.0004221786,0.00012521325,0.00009147022,0.004494381,0.0006028658,0.6144524],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99922025,0.00011399138,0.000012165413,0.00013362347,0.00031070315,0.00020927869],"domain_scores_gemma":[0.9995073,0.000059992934,0.00002016261,0.000043562162,0.00028291982,0.00008616117],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010148059,0.0011590482,0.00076752977,0.0014318248,0.0022249466,0.0023862454,0.0014346035,0.0016321331,0.05459236],"category_scores_gemma":[0.0015271934,0.000535025,0.00080366037,0.0014689735,0.00074742304,0.00074140873,0.0006147394,0.0012812561,0.0047401916],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005268648,0.0001991464,0.010178896,0.00024019736,0.000107780535,0.0004168465,0.00020893093,0.38546255,0.004511127,0.0398584,0.34095663,0.21733272],"study_design_scores_gemma":[0.00013602577,0.0002128894,0.03056004,0.00024166703,0.000058804,0.0002507032,0.0011108068,0.5441719,0.005274835,0.008103402,0.4097645,0.00011446262],"about_ca_topic_score_codex":0.93618375,"about_ca_topic_score_gemma":0.96766907,"teacher_disagreement_score":0.06381625,"about_ca_system_score_codex":0.020083388,"about_ca_system_score_gemma":0.018412335,"threshold_uncertainty_score":0.18262964},"labels":[],"label_agreement":null},{"id":"W7018241209","doi":"","title":"Cordelio Power Sells 49% Stake in Ontario Renewable Power Portfolio to Axium Infrastructure - Commodities (COMMODIT) News","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Portfolio; Power (physics); Renewable energy; Key (lock); Investment (military)","score_opus":0.007944756730897215,"score_gpt":0.19297320662606068,"score_spread":0.18502844989516348,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7018241209","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003501954,0.00077846326,0.0004088462,0.019215923,0.0022213163,0.00005843488,0.005827466,0.00044323364,0.96754426],"genre_scores_gemma":[0.0064774505,0.00031024995,0.00010653214,0.0012849494,0.00018641725,0.000008244567,0.0008861684,0.00011272928,0.99062717],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99923766,0.00001785685,0.0000074642944,0.000037327525,0.00052333286,0.00017636556],"domain_scores_gemma":[0.99899215,0.00006885216,0.000023974068,0.00005511572,0.00059770094,0.00026220572],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049370097,0.00045710587,0.00024664475,0.0008204198,0.0036515063,0.0049654436,0.00049091026,0.0023921097,0.17492343],"category_scores_gemma":[0.0019684846,0.00028815938,0.0004527112,0.0009113086,0.0006808236,0.0009302142,0.000840903,0.0021071797,0.03147069],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003218265,0.000009377132,0.0003902873,0.0000144334235,0.0000025109507,0.0000743813,0.000037944446,0.00008728617,0.00017418279,0.0056212335,0.98351556,0.010040446],"study_design_scores_gemma":[0.000007478707,0.000005935913,0.0015734112,0.00001703714,0.0000023209086,0.000014341305,0.00009673769,0.0001726975,0.00018899977,0.0006225933,0.9972915,0.000006878639],"about_ca_topic_score_codex":0.7242172,"about_ca_topic_score_gemma":0.9291441,"teacher_disagreement_score":0.27578282,"about_ca_system_score_codex":0.013566616,"about_ca_system_score_gemma":0.011795961,"threshold_uncertainty_score":0.5851772},"labels":[],"label_agreement":null},{"id":"W7019340765","doi":"","title":"Germany's Siemens Energy posts further losses in second quarter","year":2023,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Siemens; Energy (signal processing); Quarter (Canadian coin); Energy consumption; Work (physics)","score_opus":0.003677588553923786,"score_gpt":0.18444167532542952,"score_spread":0.18076408677150574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7019340765","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0051955376,0.0010053113,0.0020921517,0.005805359,0.00475526,0.00010373248,0.005637608,0.0015350848,0.9738699],"genre_scores_gemma":[0.007002737,0.00027811457,0.0002903214,0.00046449096,0.00013589286,0.000023539535,0.0014809483,0.00031623887,0.9900079],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99948835,0.000027996593,0.000009656226,0.00003740218,0.00031695582,0.000119679666],"domain_scores_gemma":[0.9996433,0.000042756554,0.000019170115,0.000039279195,0.00017234308,0.000083157625],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006095062,0.0013002614,0.0005037198,0.0013102076,0.0011283251,0.0034447925,0.00071173755,0.002785381,0.25274855],"category_scores_gemma":[0.0014068111,0.0003451181,0.00056622556,0.00064707315,0.00050261663,0.0015936982,0.0010979135,0.0019419352,0.13996369],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000104931554,0.000044436572,0.00018337215,0.00004252292,0.000004751125,0.00008590145,0.000018622262,0.00063466193,0.00062377925,0.009481133,0.94578886,0.042987168],"study_design_scores_gemma":[0.00002936784,0.00005710783,0.001695594,0.00004925637,0.000005951754,0.00009142714,0.00005184046,0.0011000271,0.0012301195,0.0040244786,0.99165374,0.000011072928],"about_ca_topic_score_codex":0.017342536,"about_ca_topic_score_gemma":0.025178706,"teacher_disagreement_score":0.25274855,"about_ca_system_score_codex":0.0018822792,"about_ca_system_score_gemma":0.0025428606,"threshold_uncertainty_score":0.8455281},"labels":[],"label_agreement":null},{"id":"W7019658000","doi":"","title":"Hydro-Québec and Transmission Developers Selected to Partner with New York State to Help Achieve the Clean Energy Transition","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"State (computer science); Clean energy; Energy (signal processing); Transmission (telecommunications); Key (lock); Electricity","score_opus":0.005991248222980696,"score_gpt":0.17906676184986103,"score_spread":0.17307551362688034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7019658000","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007443068,0.0008669982,0.0015222054,0.01361728,0.0011972713,0.00032909002,0.0078107943,0.000662744,0.9665505],"genre_scores_gemma":[0.0071062874,0.0001973085,0.00053401996,0.0009653257,0.000024482099,0.000034582896,0.00084649236,0.00009592124,0.9901957],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995327,0.000020711832,0.0000049068212,0.000025661819,0.00024450684,0.00017152177],"domain_scores_gemma":[0.99907446,0.000036718786,0.000018774519,0.00002864378,0.0005906327,0.00025073477],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005119579,0.00063794747,0.00023991277,0.00083380495,0.0034314722,0.002480938,0.00067594915,0.0023369796,0.15775199],"category_scores_gemma":[0.0010499536,0.0003107201,0.00036843,0.0008643047,0.00056452595,0.0007057152,0.000883979,0.0018178914,0.020399986],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003763674,0.00007166597,0.0014530561,0.000032539992,0.000005107802,0.00012884836,0.000054018252,0.00049892894,0.0006259161,0.010282734,0.9606636,0.026145905],"study_design_scores_gemma":[0.00002521561,0.000013776751,0.0057005947,0.000033649278,0.0000037572274,0.000032909065,0.00018472773,0.0008821641,0.00054069515,0.0006346964,0.99193573,0.000012045599],"about_ca_topic_score_codex":0.9245363,"about_ca_topic_score_gemma":0.9837112,"teacher_disagreement_score":0.15775199,"about_ca_system_score_codex":0.016355403,"about_ca_system_score_gemma":0.039773066,"threshold_uncertainty_score":0.52773297},"labels":[],"label_agreement":null},{"id":"W7019789173","doi":"","title":"Hydro Ottawa Applauds Oxford Properties for Investing in Efficiency","year":2012,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Work (physics); Productivity; Investment (military)","score_opus":0.012940359598475537,"score_gpt":0.19497262251453507,"score_spread":0.18203226291605953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7019789173","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0058591724,0.0014414587,0.004637231,0.009880531,0.0014372871,0.00011908899,0.009308976,0.0022037602,0.96511245],"genre_scores_gemma":[0.013057025,0.00039308576,0.0015405533,0.00020672781,0.00006192615,0.00002017156,0.0010768707,0.0004817913,0.9831618],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990107,0.000064381675,0.000027374557,0.00008691266,0.0006778781,0.00013271581],"domain_scores_gemma":[0.99801683,0.00032116796,0.00009033612,0.00023966348,0.0009627163,0.00036928503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013077143,0.0008604287,0.00048291672,0.001554293,0.001441982,0.0024364998,0.00078126596,0.001734549,0.235468],"category_scores_gemma":[0.0041859215,0.00056202273,0.00039904076,0.0014053208,0.00075467204,0.0016074161,0.000992929,0.001826134,0.030482037],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016577331,0.000055166915,0.0012772549,0.00016017623,0.000010633493,0.00015563043,0.00011394813,0.0017961629,0.0006835441,0.03159014,0.878562,0.085429616],"study_design_scores_gemma":[0.000018572875,0.000023549626,0.0018784874,0.00004277516,0.0000053187828,0.00006514357,0.00010226253,0.0015038609,0.0007794145,0.0027077214,0.99285793,0.00001498705],"about_ca_topic_score_codex":0.15940605,"about_ca_topic_score_gemma":0.4312347,"teacher_disagreement_score":0.235468,"about_ca_system_score_codex":0.005078955,"about_ca_system_score_gemma":0.0067509054,"threshold_uncertainty_score":0.78771895},"labels":[],"label_agreement":null},{"id":"W7019795049","doi":"","title":"Identification of umbrella constraints in power generation scheduling problems","year":2015,"lang":"en","type":"dissertation","venue":"eScholarship@McGill (McGill)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"McGill University","keywords":"Exploit; Scheduling (production processes); Optimization problem; Set (abstract data type); Identification (biology); Consistency (knowledge bases); Electric power system; Constraint (computer-aided design); Power system simulation; Heuristics","score_opus":0.0177314913452713,"score_gpt":0.23761789936466293,"score_spread":0.21988640801939163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7019795049","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016849386,0.00036878837,0.979506,0.00035996482,0.00003698455,0.00018346829,0.00010199518,0.00008964429,0.0025038812],"genre_scores_gemma":[0.18969336,0.00057589886,0.8065668,0.00023084633,0.00011070773,0.0005697469,0.00039094884,0.000110270135,0.001751422],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99086285,0.0050127683,0.0004825111,0.0009772099,0.0021368016,0.000527873],"domain_scores_gemma":[0.9819708,0.013661907,0.002113151,0.0008984078,0.0010395566,0.00031617066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00964337,0.0022456173,0.002166535,0.0024467364,0.0015088315,0.0031550166,0.0023312953,0.0021299182,0.0031371063],"category_scores_gemma":[0.02396619,0.0014360818,0.0022034391,0.002570176,0.0022381851,0.003706566,0.0032058277,0.0045713745,0.0004896762],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001965473,0.00022057393,0.0017218753,0.00033459946,0.00012923403,0.0003021762,0.00025527042,0.8118883,0.0031272194,0.11745111,0.0015877212,0.06278544],"study_design_scores_gemma":[0.000040620853,0.00008354873,0.00026770905,0.000067686546,0.000018019447,0.000060686954,0.00007125471,0.9366453,0.0021022938,0.058535054,0.0020879328,0.000019787605],"about_ca_topic_score_codex":0.002465783,"about_ca_topic_score_gemma":0.002510717,"teacher_disagreement_score":0.00964337,"about_ca_system_score_codex":0.0016030768,"about_ca_system_score_gemma":0.00269838,"threshold_uncertainty_score":0.05099964},"labels":[],"label_agreement":null},{"id":"W7023815645","doi":"","title":"Power Corporation of Canada (via Public) / Power Corporation Reports First Quarter Financial Results and Dividend Increase of 7%","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Corporation; Quarter (Canadian coin); Dividend; Power (physics)","score_opus":0.005397743168676217,"score_gpt":0.17125268341000963,"score_spread":0.1658549402413334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7023815645","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021462267,0.0010746123,0.0009466379,0.0068471264,0.001125117,0.0001892162,0.019193323,0.0013885379,0.9477731],"genre_scores_gemma":[0.06559306,0.001337863,0.0011803441,0.00075196836,0.0001382453,0.000028823553,0.011558414,0.00036227712,0.9190489],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983,0.00002754091,0.000017794031,0.000068028676,0.0012174767,0.0003691584],"domain_scores_gemma":[0.9973015,0.00010033486,0.000049825205,0.0000935387,0.0021271145,0.00032763116],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00095017895,0.0008668028,0.00044776977,0.002041657,0.0019406253,0.003868757,0.00072527246,0.0012880634,0.100176044],"category_scores_gemma":[0.0024730314,0.00028982823,0.0005951137,0.001840144,0.0006195696,0.0009290468,0.000590941,0.0017410765,0.022067923],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022185234,0.00021384403,0.0024945813,0.000082866725,0.000019224646,0.0002060458,0.000044497763,0.0011146009,0.0012919779,0.010623716,0.9288994,0.054787263],"study_design_scores_gemma":[0.00014257112,0.0001303842,0.020880854,0.00011437158,0.000051552488,0.00011756763,0.00034070783,0.003699915,0.009587651,0.0029223051,0.9619653,0.000046722733],"about_ca_topic_score_codex":0.7199596,"about_ca_topic_score_gemma":0.82079625,"teacher_disagreement_score":0.28004038,"about_ca_system_score_codex":0.01304419,"about_ca_system_score_gemma":0.024434702,"threshold_uncertainty_score":0.56337917},"labels":[],"label_agreement":null},{"id":"W7023971795","doi":"","title":"Power Corporation Reports Fourth Quarter and 2017 Financial Results","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Corporation; Quarter (Canadian coin); Power (physics); Financial management; Work (physics)","score_opus":0.005371328527516661,"score_gpt":0.1905274293721199,"score_spread":0.18515610084460324,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7023971795","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018984366,0.000517851,0.0014256156,0.003771244,0.0018840843,0.00015798533,0.011861157,0.0014812892,0.9770024],"genre_scores_gemma":[0.006112792,0.00050297874,0.0005791196,0.0003449881,0.00029126587,0.000060549402,0.0071074083,0.00050678005,0.98449415],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976228,0.00016972802,0.00007260378,0.00016370272,0.0016679422,0.00030332815],"domain_scores_gemma":[0.9961898,0.00036710015,0.00015218786,0.00045836784,0.002368009,0.00046456285],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0021572094,0.0016150544,0.00078268995,0.003723792,0.0015773725,0.005496792,0.0013326807,0.0020340977,0.43460965],"category_scores_gemma":[0.0069025406,0.00051646965,0.00080511905,0.0026988229,0.0007538904,0.00274901,0.001154693,0.0024868974,0.28418002],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007943016,0.00013570504,0.0002844007,0.000042628526,0.00000583204,0.0000418877,0.000008766476,0.00047260057,0.00012732256,0.004800512,0.96045464,0.033546176],"study_design_scores_gemma":[0.00008667217,0.00008562883,0.0018639471,0.0000743637,0.000012856917,0.00005923976,0.00005483983,0.0019448975,0.0014286459,0.0048921793,0.9894763,0.000020424017],"about_ca_topic_score_codex":0.012320998,"about_ca_topic_score_gemma":0.019262888,"teacher_disagreement_score":0.56539035,"about_ca_system_score_codex":0.0026406806,"about_ca_system_score_gemma":0.003946466,"threshold_uncertainty_score":0.80646074},"labels":[],"label_agreement":null},{"id":"W7024626484","doi":"","title":"SNL: MidAmerican forms venture with TransAlta to compete for 500-kV Alberta project","year":2013,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Work (physics); Government (linguistics); Process (computing); Agency (philosophy)","score_opus":0.004127414833711951,"score_gpt":0.19651139163313236,"score_spread":0.1923839767994204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7024626484","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0070880656,0.00033786095,0.0047106664,0.0026169606,0.00046148835,0.00008904209,0.0033642473,0.0018105636,0.9795212],"genre_scores_gemma":[0.027236264,0.00024662793,0.002479819,0.00023090748,0.00004319702,0.000013911804,0.002984992,0.0005057596,0.9662585],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994804,0.000023026376,0.0000036161214,0.000038466238,0.00031344895,0.00014101008],"domain_scores_gemma":[0.99900776,0.000023899134,0.000011064403,0.000039708757,0.0005236772,0.00039396662],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008286542,0.00082930434,0.00031130007,0.0012623589,0.0018807926,0.0026981824,0.0011433489,0.00086616055,0.19263753],"category_scores_gemma":[0.0007259028,0.00024091054,0.00032409147,0.0009803043,0.00055865454,0.000834012,0.0012579713,0.0014583339,0.040339552],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018201278,0.00017561969,0.0013407182,0.00004334854,0.000015165771,0.00013724092,0.00006860825,0.0023700374,0.0013005685,0.018762823,0.8860696,0.08953424],"study_design_scores_gemma":[0.00005741443,0.00006747902,0.0031143026,0.000038230282,0.00001033337,0.000098786055,0.00038120174,0.008923909,0.0017342727,0.0044837086,0.981069,0.00002135119],"about_ca_topic_score_codex":0.38083765,"about_ca_topic_score_gemma":0.7144953,"teacher_disagreement_score":0.6191623,"about_ca_system_score_codex":0.006551345,"about_ca_system_score_gemma":0.016623152,"threshold_uncertainty_score":0.75724185},"labels":[],"label_agreement":null},{"id":"W7025293720","doi":"","title":"UGE International Reports 2015 First Quarter Financial Results - Power Engineering International","year":2015,"lang":"en","type":"other","venue":"Power engineering international","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Electric power industry; Power (physics); International finance; Electric utility","score_opus":0.0035143714836365176,"score_gpt":0.1945741624880028,"score_spread":0.1910597910043663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7025293720","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030185212,0.0042969566,0.0022081172,0.010937637,0.01096827,0.00014753127,0.02050307,0.0022406369,0.9456791],"genre_scores_gemma":[0.022196196,0.003419557,0.0024354968,0.0015230705,0.0016816349,0.00010329023,0.018060617,0.0011251441,0.949455],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9973182,0.0001908396,0.00008795125,0.00014692389,0.0019604217,0.00029567344],"domain_scores_gemma":[0.9961856,0.00032004653,0.00021297016,0.00037398143,0.0022016112,0.0007058299],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031876354,0.0015791594,0.0009398517,0.0041337837,0.0010776381,0.009800206,0.0012330161,0.0021949324,0.26109356],"category_scores_gemma":[0.0077776145,0.000382577,0.000861996,0.0034481043,0.00079817144,0.0028081015,0.0016920022,0.0023421037,0.15698227],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010591829,0.00009310336,0.00030561147,0.000060847724,0.000009794509,0.000030105983,0.000006179099,0.00044221454,0.00010033968,0.004544403,0.9617154,0.03258601],"study_design_scores_gemma":[0.00006341753,0.0000894757,0.0032964244,0.00015319441,0.000015511772,0.0000599632,0.00004782594,0.0017465987,0.0013965243,0.005108246,0.98799944,0.00002351525],"about_ca_topic_score_codex":0.009758274,"about_ca_topic_score_gemma":0.014108479,"teacher_disagreement_score":0.26109356,"about_ca_system_score_codex":0.0034455047,"about_ca_system_score_gemma":0.0038474405,"threshold_uncertainty_score":0.873445},"labels":[],"label_agreement":null},{"id":"W7025543570","doi":"","title":"What's the Next Big Thing in the APAC Solid State Transformers Market ? ABB (Switzerland), Siemens AG (Germany), Alstom (France), Schneider Electric SA (France), Avago Technologies Limited (U.S.), Bombardier, Inc. (Canada),Cooper Power Systems (U.S.)","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Siemens; Solid-state; Transformer; Electric power; Power (physics)","score_opus":0.006035840607808262,"score_gpt":0.19117159028972566,"score_spread":0.1851357496819174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7025543570","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0058677434,0.010873724,0.010257768,0.1616168,0.0066905674,0.00004770965,0.0034133054,0.0019655565,0.7992669],"genre_scores_gemma":[0.08441673,0.031867906,0.011054056,0.020171383,0.0042297468,0.0000502121,0.0054459386,0.0017410913,0.8410229],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995833,0.00004580433,0.000010282879,0.00003929849,0.00024053785,0.00008074955],"domain_scores_gemma":[0.99859923,0.00016246081,0.00006061218,0.000049702645,0.00063668494,0.00049139035],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011707736,0.0004523786,0.00025189188,0.0009808429,0.0008128738,0.005971608,0.00062605453,0.0019954531,0.13934687],"category_scores_gemma":[0.0020250992,0.00014600005,0.00029455696,0.0012574196,0.0006951688,0.0069084754,0.0007122115,0.0016888775,0.05386789],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006685404,0.000054065542,0.0003736251,0.00012759931,0.0000033584515,0.00007563888,0.00003732887,0.00059316645,0.00089148193,0.064649716,0.7358632,0.19726397],"study_design_scores_gemma":[0.0000093067565,0.000032108444,0.0005991807,0.00016810473,0.0000027769886,0.00008765911,0.00015382202,0.0009059109,0.0005765312,0.016280083,0.98117125,0.000013356637],"about_ca_topic_score_codex":0.0051148357,"about_ca_topic_score_gemma":0.010785102,"teacher_disagreement_score":0.13934687,"about_ca_system_score_codex":0.0019862782,"about_ca_system_score_gemma":0.0030021686,"threshold_uncertainty_score":0.46616173},"labels":[],"label_agreement":null},{"id":"W7027126263","doi":"","title":"Canadian Government Invests in First Nation Microgrid Project","year":2023,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Key (lock); Microgrid; Power (physics)","score_opus":0.010169530052345653,"score_gpt":0.18443368546265815,"score_spread":0.17426415541031248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7027126263","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0069505814,0.0009614226,0.0012404927,0.02474557,0.0025332707,0.00017151711,0.016468083,0.0010086736,0.94592035],"genre_scores_gemma":[0.02461454,0.00062659744,0.0010920693,0.0018657392,0.000118414646,0.000023745415,0.004595442,0.00023536137,0.96682817],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984493,0.00005604094,0.000013553762,0.00007888927,0.0009096798,0.00049250625],"domain_scores_gemma":[0.99724835,0.00007019114,0.00003256418,0.00008290817,0.0017174067,0.0008486024],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010646208,0.0010018054,0.00046516166,0.0017023652,0.004913526,0.0031873463,0.0010215499,0.0023817136,0.12897052],"category_scores_gemma":[0.0020883002,0.00033902,0.000745959,0.0016211192,0.00069562515,0.000798459,0.001180241,0.0015117646,0.022181975],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007497099,0.00005211898,0.00088688236,0.000033910714,0.000010355299,0.000068724126,0.000031779757,0.00064468646,0.00027807377,0.00889336,0.9583096,0.030715613],"study_design_scores_gemma":[0.000030969837,0.00002908792,0.003068701,0.000036287638,0.000008758425,0.00003500608,0.00015889564,0.001253418,0.00048905925,0.001212967,0.993665,0.000011954599],"about_ca_topic_score_codex":0.9317315,"about_ca_topic_score_gemma":0.9693596,"teacher_disagreement_score":0.12897052,"about_ca_system_score_codex":0.027088173,"about_ca_system_score_gemma":0.08920806,"threshold_uncertainty_score":0.43144935},"labels":[],"label_agreement":null},{"id":"W7027274198","doi":"","title":"Canada Invests Over $960-Million in Renewable Energy and Grid","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Renewable energy; Grid; Energy (signal processing); Power grid; Intermittent energy source","score_opus":0.0031359663696301663,"score_gpt":0.15778382025392548,"score_spread":0.1546478538842953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7027274198","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0038125585,0.0015244576,0.0010843988,0.013433303,0.0019495757,0.00016496974,0.023070196,0.0011926038,0.953768],"genre_scores_gemma":[0.008850946,0.00095946353,0.0008207862,0.002192281,0.00008088609,0.000024358666,0.003741584,0.00021662556,0.98311317],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99874747,0.000030538315,0.000015987911,0.000057583195,0.0008053908,0.00034294682],"domain_scores_gemma":[0.9980895,0.000051451272,0.000030328934,0.000037781305,0.0011409925,0.0006498759],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007475053,0.0011101743,0.00045530288,0.002263805,0.003630975,0.0038801336,0.0009995721,0.002494998,0.1912323],"category_scores_gemma":[0.0017446397,0.00045254937,0.0009051533,0.0018539769,0.0008600849,0.0008884032,0.0012291459,0.0017137333,0.045101862],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037032794,0.000039875016,0.0005776343,0.000061650055,0.000007418619,0.000035170116,0.00001713481,0.00039878153,0.0002126121,0.00748305,0.9586781,0.0324516],"study_design_scores_gemma":[0.000025383479,0.000013803508,0.0020071792,0.00005467235,0.0000069738626,0.000017234011,0.000076963435,0.0006327981,0.000282026,0.0010348483,0.9958348,0.000013269451],"about_ca_topic_score_codex":0.97715795,"about_ca_topic_score_gemma":0.9905027,"teacher_disagreement_score":0.1912323,"about_ca_system_score_codex":0.031632464,"about_ca_system_score_gemma":0.093788415,"threshold_uncertainty_score":0.63973576},"labels":[],"label_agreement":null},{"id":"W7029222084","doi":"","title":"An iterative approach to negotiating bilateral contracts in mixed pool/bilateral electricity markets /","year":2005,"lang":"en","type":"dissertation","venue":"eScholarship@McGill (McGill)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Negotiation; Generator (circuit theory); Work (physics); Sign (mathematics); Electricity market; Electricity system","score_opus":0.007771502258791819,"score_gpt":0.21612627113538632,"score_spread":0.20835476887659451,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7029222084","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018659486,0.00016371849,0.94950575,0.0004383407,0.000024887722,0.00046807402,0.00008295109,0.00015703686,0.030499741],"genre_scores_gemma":[0.23893851,0.00021102776,0.74676096,0.00009369462,0.000024297982,0.0007340292,0.00011744701,0.000100480844,0.013019611],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9958145,0.0027666455,0.0001300723,0.0003375965,0.00056435395,0.00038683417],"domain_scores_gemma":[0.99459755,0.0040040403,0.00031259362,0.00035634838,0.00041581265,0.00031370216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006307113,0.0009124481,0.0012226811,0.0012183452,0.002203436,0.0032498147,0.0027173015,0.0023317148,0.021940589],"category_scores_gemma":[0.011985349,0.0011573088,0.0018243341,0.0018096828,0.0022816001,0.0044701793,0.0043898975,0.0019749168,0.0014628676],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002865958,0.00022584584,0.001360496,0.00023466989,0.00015045021,0.00048002857,0.0012272183,0.4781488,0.0013531639,0.4349802,0.0030174758,0.07853512],"study_design_scores_gemma":[0.0001123967,0.00011884791,0.0002520773,0.000072209165,0.000040722844,0.00009764245,0.0005286138,0.7785167,0.00076155673,0.21088095,0.00858717,0.000030992775],"about_ca_topic_score_codex":0.0077712988,"about_ca_topic_score_gemma":0.013722281,"teacher_disagreement_score":0.021940589,"about_ca_system_score_codex":0.0030519147,"about_ca_system_score_gemma":0.0056397635,"threshold_uncertainty_score":0.07339859},"labels":[],"label_agreement":null},{"id":"W7029227700","doi":"","title":"The Influence of Internet Media on Young Adult Development","year":2024,"lang":"en","type":"article","venue":"Scholars Crossing (Liberty University)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"The Internet; Social media; Qualitative research; Young adult; Grounded theory; Qualitative property; Data collection; Qualitative analysis; Content analysis","score_opus":0.005035876258636245,"score_gpt":0.1799886828323829,"score_spread":0.17495280657374665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7029227700","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9899496,0.00036081902,0.00003655642,0.00038463363,0.000008631145,0.000020761472,0.00014317903,0.000005874988,0.009089967],"genre_scores_gemma":[0.99837106,0.0003629991,0.000055128912,0.00006957254,0.000005027236,0.000009514296,0.000046100384,0.0000024085336,0.0010781125],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9992955,0.00021729044,0.000028787443,0.00004157507,0.00017433838,0.00024255668],"domain_scores_gemma":[0.9966018,0.0011225581,0.00061710883,0.00006800537,0.00070758216,0.00088294566],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007768684,0.00016781701,0.00014876513,0.0012564756,0.0025032857,0.0028382905,0.00041342308,0.00030018418,0.0031023459],"category_scores_gemma":[0.003091227,0.0001441867,0.00014966306,0.0009213282,0.0011596545,0.00066499464,0.0011587037,0.00045302222,0.00018901685],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000079772304,0.00015244781,0.7736777,0.00012857854,0.000021822787,0.0019145281,0.1760255,0.000051604235,0.00094532105,0.00082626246,0.0016019915,0.044574518],"study_design_scores_gemma":[0.000005543775,0.000080578684,0.7493411,0.0001733304,0.000025322488,0.0004109436,0.2366523,0.000088906694,0.00033576597,0.00010538738,0.012764084,0.000016841135],"about_ca_topic_score_codex":0.5565815,"about_ca_topic_score_gemma":0.7428966,"teacher_disagreement_score":0.5565815,"about_ca_system_score_codex":0.005657864,"about_ca_system_score_gemma":0.0062328447,"threshold_uncertainty_score":0.89205974},"labels":[],"label_agreement":null},{"id":"W7029362041","doi":"","title":"I Squared Capital to Sell Cube Hydro to Ontario Power Generation - news","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Capital (architecture); Production (economics); Power (physics); Electricity generation; Cube (algebra); Hydro power","score_opus":0.0061321094114457336,"score_gpt":0.18376536920141462,"score_spread":0.17763325978996888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7029362041","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014775381,0.0010189249,0.0005703037,0.029207425,0.005201904,0.000059649195,0.0056442954,0.0005217738,0.95629823],"genre_scores_gemma":[0.0038142328,0.00038184546,0.00016738164,0.001739455,0.00032532582,0.000007654112,0.0008273572,0.00013603218,0.9926006],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99940586,0.000020842546,0.000008147453,0.00003232047,0.00041545456,0.00011744182],"domain_scores_gemma":[0.998818,0.000073845054,0.000030275329,0.00005457876,0.00075967325,0.00026369232],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046721782,0.00058456825,0.00026536206,0.00080468104,0.0030550314,0.0042595672,0.00055334106,0.0020645503,0.28759032],"category_scores_gemma":[0.0021906465,0.00030530468,0.0004386201,0.00098548,0.0007562011,0.0014086559,0.0008324331,0.002439328,0.0667851],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000149332345,0.000005371567,0.0001388136,0.000011271025,0.0000013447296,0.000023196708,0.000016453698,0.000054418175,0.000062909356,0.0027676462,0.98892015,0.00798343],"study_design_scores_gemma":[0.0000063122243,0.000004697589,0.00069807284,0.00002015432,0.0000013730787,0.000009296304,0.00006006752,0.00012518083,0.00008667063,0.0007986385,0.998184,0.0000054418197],"about_ca_topic_score_codex":0.6188819,"about_ca_topic_score_gemma":0.87294185,"teacher_disagreement_score":0.38111812,"about_ca_system_score_codex":0.011224358,"about_ca_system_score_gemma":0.012656759,"threshold_uncertainty_score":0.9620855},"labels":[],"label_agreement":null},{"id":"W7030313420","doi":"","title":"MidAmerican Transmission Enters the Competitive Transmission Arena with Joint Venture in Canada\\n| Reuters","year":2012,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transmission (telecommunications); Joint (building); Joint venture; Key (lock); Competitive advantage","score_opus":0.0036922901389908887,"score_gpt":0.15697133495444077,"score_spread":0.15327904481544988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7030313420","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0048010177,0.000798416,0.001128921,0.0026369523,0.00030794175,0.00003999772,0.0019148063,0.0005066102,0.98786527],"genre_scores_gemma":[0.017800173,0.00061101036,0.00046910424,0.00017967416,0.000036687114,0.000008593373,0.00078639254,0.00018647678,0.9799218],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994703,0.000019688017,0.0000056071417,0.000050485312,0.00028008173,0.00017387219],"domain_scores_gemma":[0.99932504,0.000036870406,0.000020248875,0.000041727082,0.00035650804,0.00021955656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048059493,0.00070484745,0.00035809082,0.0010680101,0.0036572898,0.0044589993,0.0006793057,0.0013067892,0.21786696],"category_scores_gemma":[0.0010012472,0.00030805834,0.00038502383,0.0019248155,0.0005804216,0.0013507033,0.0011345801,0.0017097497,0.0290337],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000082211795,0.00010247477,0.0013521594,0.00006389461,0.000010899766,0.00019533598,0.00011786779,0.0015558422,0.00054260116,0.035251435,0.85940427,0.10132102],"study_design_scores_gemma":[0.000017281907,0.000021628834,0.0034339086,0.00007028718,0.000007209291,0.00006141611,0.00025216938,0.0021771733,0.0008845468,0.0026683416,0.99039197,0.000014023119],"about_ca_topic_score_codex":0.6434132,"about_ca_topic_score_gemma":0.8744257,"teacher_disagreement_score":0.3565868,"about_ca_system_score_codex":0.00988334,"about_ca_system_score_gemma":0.019705284,"threshold_uncertainty_score":0.7288376},"labels":[],"label_agreement":null},{"id":"W7030364967","doi":"","title":"N.Y.C. Looking at Deal for Canadian Hydroelectricity","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydroelectricity; Government (linguistics); Work (physics); Field (mathematics)","score_opus":0.00431390956567574,"score_gpt":0.1801079898927196,"score_spread":0.17579408032704386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7030364967","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00074980216,0.0025431074,0.0005906171,0.028750818,0.0017848792,0.0000743549,0.010205525,0.00054846756,0.9547524],"genre_scores_gemma":[0.0024145625,0.0013135375,0.00030176144,0.0029894204,0.000059281338,0.00001592319,0.0013362467,0.00014821556,0.9914209],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994524,0.000012476191,0.000007966074,0.00003511001,0.00035386428,0.00013820341],"domain_scores_gemma":[0.99889296,0.000044677166,0.000016992863,0.000023553028,0.00084890093,0.00017284554],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00047758291,0.0006980617,0.00035537762,0.0009318743,0.0047194352,0.0027868834,0.0006915801,0.0031380276,0.3112389],"category_scores_gemma":[0.0016637414,0.00032469176,0.00039579792,0.0016353016,0.0006539377,0.0011039695,0.0008011803,0.002669237,0.07669213],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011047658,0.000008266142,0.0001371949,0.000021778507,0.0000016926094,0.000022678008,0.000012777773,0.000055139444,0.00010240948,0.0028565908,0.9865904,0.010179993],"study_design_scores_gemma":[0.0000051486677,0.000003804737,0.000786403,0.00003888864,0.0000023330156,0.000007827666,0.000059985123,0.000093749906,0.000086783664,0.00042027177,0.99848735,0.0000074190043],"about_ca_topic_score_codex":0.8995564,"about_ca_topic_score_gemma":0.9755034,"teacher_disagreement_score":0.3112389,"about_ca_system_score_codex":0.011776388,"about_ca_system_score_gemma":0.037352957,"threshold_uncertainty_score":0.9824341},"labels":[],"label_agreement":null},{"id":"W7030513807","doi":"","title":"National Instruments and Prolucid Put Green Energy on the Canadian Grid","year":2013,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Grid; Energy (signal processing); Renewable energy; National Grid; Efficient energy use; Measure (data warehouse)","score_opus":0.005380907904338332,"score_gpt":0.16245472285994725,"score_spread":0.1570738149556089,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7030513807","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017290394,0.0005474724,0.0035409844,0.0056715994,0.00059492094,0.00008363691,0.0036920204,0.0012769591,0.98286337],"genre_scores_gemma":[0.014252172,0.0006436359,0.0027052343,0.0008301362,0.00005891773,0.000021948275,0.0014398034,0.000660963,0.97938716],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980185,0.0000597121,0.000019267261,0.00008111688,0.0013807872,0.00044057777],"domain_scores_gemma":[0.9977513,0.00013591158,0.00003412777,0.0001455082,0.0016511795,0.00028199403],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011197936,0.0009800498,0.00042598997,0.0018465591,0.0037830235,0.0050689457,0.0011568895,0.0021230227,0.17444469],"category_scores_gemma":[0.0038182882,0.0005026006,0.0006556257,0.0024236192,0.001185356,0.0017353798,0.0016210675,0.0029137142,0.024965474],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006370461,0.0000352571,0.00068965735,0.000052238967,0.000009269597,0.000057533827,0.00009340941,0.0018025626,0.00038186842,0.080255516,0.86128503,0.05527388],"study_design_scores_gemma":[0.000021524846,0.000011315061,0.0014598473,0.00005509603,0.000007740361,0.000022622971,0.00018592605,0.0022338752,0.00097031036,0.005649349,0.9893624,0.000019972813],"about_ca_topic_score_codex":0.8780767,"about_ca_topic_score_gemma":0.94682294,"teacher_disagreement_score":0.17444469,"about_ca_system_score_codex":0.024921406,"about_ca_system_score_gemma":0.04337753,"threshold_uncertainty_score":0.5835756},"labels":[],"label_agreement":null},{"id":"W7030550751","doi":"","title":"NKT secures contract for the Canadian transmission line Hertel-New York","year":2022,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Transmission (telecommunications); Line (geometry)","score_opus":0.010983517146395875,"score_gpt":0.20253382346964585,"score_spread":0.19155030632324999,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7030550751","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002082328,0.00017995517,0.002831303,0.0018654221,0.0004098029,0.00011411146,0.009112347,0.0010110766,0.98239374],"genre_scores_gemma":[0.0069035296,0.000093073744,0.0010464857,0.00016908922,0.0000304429,0.00002317927,0.0026529217,0.00047844692,0.98860276],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99835724,0.00007235451,0.000025052,0.00011958345,0.0011241552,0.00030156918],"domain_scores_gemma":[0.9972785,0.00019265068,0.000049187875,0.00021134097,0.0019101108,0.00035821614],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0011392724,0.0008675787,0.00060072815,0.0016956442,0.0032095327,0.0033126385,0.0017752919,0.0023688641,0.3788289],"category_scores_gemma":[0.0031799143,0.00046479533,0.0006134599,0.00141482,0.00083812315,0.0010057224,0.0010742376,0.0019345436,0.13509044],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016810144,0.00005895763,0.00048932375,0.0000808195,0.0000105357585,0.00010182234,0.00009652923,0.001559732,0.0016135838,0.04628303,0.90051204,0.049025644],"study_design_scores_gemma":[0.000029224673,0.000018718156,0.0011852249,0.000032822074,0.0000056926224,0.000040336665,0.00009279853,0.0028088938,0.0008517747,0.0017313198,0.99318576,0.000017310142],"about_ca_topic_score_codex":0.7834331,"about_ca_topic_score_gemma":0.8713458,"teacher_disagreement_score":0.3788289,"about_ca_system_score_codex":0.011159547,"about_ca_system_score_gemma":0.02987273,"threshold_uncertainty_score":0.8860252},"labels":[],"label_agreement":null},{"id":"W7030588641","doi":"","title":"Northern Power Systems Announces Strong Third Quarter 2014 Revenue Growth and Achieves EBITDA Profitability","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Earnings before interest, taxes, depreciation, and amortization; Profitability index; Quarter (Canadian coin); Revenue; Power (physics)","score_opus":0.0033481297260577183,"score_gpt":0.18008173726329896,"score_spread":0.17673360753724124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7030588641","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010742508,0.000293944,0.0038208645,0.0087808585,0.0010511542,0.00006199382,0.0014643504,0.0018142597,0.9719702],"genre_scores_gemma":[0.08225059,0.000451463,0.0028383585,0.00155047,0.00041454067,0.000044228676,0.0020033952,0.00081035047,0.9096366],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99919003,0.000063481726,0.000009952606,0.000045168206,0.00056469144,0.00012663812],"domain_scores_gemma":[0.9989981,0.00010445393,0.000045117857,0.00008693411,0.00052543555,0.0002399227],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0012844335,0.0004533307,0.00031160712,0.0005919255,0.0012118373,0.003551792,0.00058911473,0.0011343532,0.09420225],"category_scores_gemma":[0.00316198,0.0002528406,0.00036955616,0.0005611976,0.0005789991,0.0012354644,0.0012046978,0.0021070873,0.021872206],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009518837,0.00014342631,0.0014651369,0.000038611503,0.0000111884265,0.000093382514,0.000032179258,0.0026248025,0.00057780574,0.03233025,0.90341127,0.05917683],"study_design_scores_gemma":[0.00006591665,0.00008459474,0.0070931544,0.000057309804,0.000015636537,0.000093526025,0.00019348202,0.011215928,0.0027692316,0.014171962,0.9642175,0.000021799531],"about_ca_topic_score_codex":0.029365702,"about_ca_topic_score_gemma":0.073454455,"teacher_disagreement_score":0.9057977,"about_ca_system_score_codex":0.002960625,"about_ca_system_score_gemma":0.005044593,"threshold_uncertainty_score":0.31513792},"labels":[],"label_agreement":null},{"id":"W7033283514","doi":"","title":"Portable Power Station Market (US$ 5.9 Billion) | North America Dominate by United States, Canada, Mexico","year":2023,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Government (linguistics); Power station","score_opus":0.002051402900571746,"score_gpt":0.1603223056021972,"score_spread":0.15827090270162547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7033283514","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016304005,0.00041253187,0.00052805967,0.0021806883,0.00027554182,0.00003092614,0.005998083,0.0010608865,0.98788285],"genre_scores_gemma":[0.006924107,0.0007920722,0.00024004535,0.00028144981,0.000106983614,0.000014114977,0.0034367256,0.00025278924,0.9879518],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998246,0.0000051199036,0.0000021677547,0.000021731,0.0001116746,0.000034740686],"domain_scores_gemma":[0.999699,0.000015295447,0.000014247166,0.0000146827615,0.00017526998,0.000081463506],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000121469006,0.00069524406,0.00027078105,0.0010845461,0.0013921619,0.0023017589,0.00046008086,0.00068408856,0.4539578],"category_scores_gemma":[0.00042476028,0.00021290542,0.00027172113,0.0017307369,0.00032654658,0.0014397331,0.0007191813,0.00097031385,0.17110865],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002079903,0.000018091823,0.00031599723,0.000026410702,0.0000017439943,0.00002322469,0.00000954523,0.00012008964,0.00020536366,0.0029847398,0.9429147,0.053359184],"study_design_scores_gemma":[0.000012393523,0.000009192315,0.0015742689,0.000027882663,0.0000027121066,0.000026668135,0.000052435535,0.00038411605,0.00023411328,0.00060522236,0.9970675,0.000003455742],"about_ca_topic_score_codex":0.15744449,"about_ca_topic_score_gemma":0.2855924,"teacher_disagreement_score":0.8425555,"about_ca_system_score_codex":0.0029774467,"about_ca_system_score_gemma":0.004781537,"threshold_uncertainty_score":0.77886295},"labels":[],"label_agreement":null},{"id":"W7036605822","doi":"","title":"Canada Hydropower Market Research &amp;amp; Analysis Report 2025: Radiant Insights, Inc","year":2015,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Market research; Market analysis; Government (linguistics)","score_opus":0.02524277314629747,"score_gpt":0.27831804724647624,"score_spread":0.25307527410017877,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7036605822","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015644655,0.0029151496,0.014983924,0.008682296,0.0009798683,0.0005218444,0.31554398,0.0032072423,0.6375211],"genre_scores_gemma":[0.071885005,0.004281802,0.018197697,0.0008969219,0.00023414011,0.00019841558,0.09767413,0.0020029787,0.8046289],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976654,0.000089842586,0.000027209413,0.000107317275,0.0018440912,0.00026603034],"domain_scores_gemma":[0.9964958,0.00017992618,0.00008625596,0.00011545273,0.0029097039,0.0002128821],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013289985,0.0015393345,0.0009822302,0.0032995138,0.0015400867,0.003358691,0.0015548206,0.0009614459,0.06981883],"category_scores_gemma":[0.0034201448,0.00077974156,0.0007562793,0.006518162,0.0005503264,0.0015952414,0.00063231494,0.0016151922,0.018806988],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000087291024,0.000060348015,0.0013225414,0.00012547223,0.000028938426,0.000039427407,0.000035637433,0.008978161,0.00031037413,0.0075873435,0.9397187,0.04170578],"study_design_scores_gemma":[0.0001113853,0.000049056227,0.009755396,0.00018312426,0.000063914296,0.00004571104,0.00030123317,0.04730624,0.0032919014,0.005810111,0.9330071,0.00007497793],"about_ca_topic_score_codex":0.9426546,"about_ca_topic_score_gemma":0.97110164,"teacher_disagreement_score":0.06981883,"about_ca_system_score_codex":0.024911257,"about_ca_system_score_gemma":0.051259052,"threshold_uncertainty_score":0.23356724},"labels":[],"label_agreement":null},{"id":"W7037802107","doi":"","title":"An Environmentally Conscious Robust Optimization Approach for Planning Power Generating Systems","year":2007,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Production (economics); Work (physics); Measure (data warehouse); Mains electricity; Term (time); Context (archaeology)","score_opus":0.008652195106460562,"score_gpt":0.1920649120680526,"score_spread":0.18341271696159203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7037802107","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005121798,0.00049248623,0.9866789,0.00028315024,0.00003747518,0.00007209717,0.00016204779,0.0001664248,0.0069856495],"genre_scores_gemma":[0.4855723,0.0017246667,0.49844608,0.00025282838,0.00016630735,0.0010781542,0.0008388453,0.0002615037,0.011659301],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992974,0.0003323353,0.000032915723,0.00012279907,0.00014625871,0.00006825815],"domain_scores_gemma":[0.9982827,0.0013551797,0.00011285235,0.00003688939,0.00017712124,0.000035422694],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016909175,0.0015861893,0.0012617229,0.0009004033,0.0004722986,0.0016873418,0.0011432628,0.0012915578,0.0038179634],"category_scores_gemma":[0.003676222,0.0010753624,0.0012591634,0.0012031737,0.00095820735,0.0010440885,0.0012412664,0.0015723843,0.00048398192],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005789259,0.0000042706824,0.00004134121,0.000016325484,0.000011212469,0.00001406022,0.0000072897565,0.992733,0.00005900804,0.003869119,0.000144053,0.0030945898],"study_design_scores_gemma":[0.0000033347735,0.000008302274,0.000022087308,0.000006446091,0.000003996145,0.0000023478103,0.00000658711,0.99416465,0.000050120572,0.005344581,0.00038487808,0.0000027231442],"about_ca_topic_score_codex":0.011846114,"about_ca_topic_score_gemma":0.009636473,"teacher_disagreement_score":0.011846114,"about_ca_system_score_codex":0.0015797262,"about_ca_system_score_gemma":0.0018960014,"threshold_uncertainty_score":0.023554325},"labels":[],"label_agreement":null},{"id":"W7043142420","doi":"","title":"RE Royalties Provides $6.3 Million Financing for a 200 Megawatt Solar Project in Alberta, Canada","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Investment (military); Work (physics); Payment","score_opus":0.006302046186512186,"score_gpt":0.20016690633054007,"score_spread":0.19386486014402787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7043142420","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016844276,0.0019183676,0.0026612189,0.015713034,0.0018846048,0.000213204,0.010604422,0.001955486,0.94820535],"genre_scores_gemma":[0.029597724,0.000733231,0.0009403817,0.0005407167,0.00006145224,0.000018193043,0.0030022056,0.00022739492,0.9648787],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99912673,0.000034396075,0.000009418343,0.000056527417,0.00049639895,0.00027651247],"domain_scores_gemma":[0.99825126,0.000063498395,0.00001841412,0.000044510805,0.0009827933,0.0006394936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071758893,0.0007768473,0.00034555304,0.0013043402,0.0040852283,0.0025812762,0.0009926656,0.0016902551,0.15080422],"category_scores_gemma":[0.0012747559,0.0004578692,0.0005413198,0.0010065692,0.00075226603,0.00060816953,0.0013204883,0.0015354911,0.023577036],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001412519,0.00008136618,0.0024431164,0.00007072534,0.000016921987,0.0002994672,0.00009097081,0.0013782674,0.0014282138,0.00883832,0.91280466,0.07240671],"study_design_scores_gemma":[0.000061941086,0.000038093673,0.008453009,0.000054938446,0.000011312576,0.00013376468,0.00037920853,0.0028233272,0.00082570914,0.0010317963,0.98615927,0.000027634036],"about_ca_topic_score_codex":0.9518084,"about_ca_topic_score_gemma":0.97714466,"teacher_disagreement_score":0.15080422,"about_ca_system_score_codex":0.018962186,"about_ca_system_score_gemma":0.06698291,"threshold_uncertainty_score":0.5044904},"labels":[],"label_agreement":null},{"id":"W7043146046","doi":"","title":"Selection for \"Ice Resistant\" Antifreeze Proteins and Ice or Hydrate Inhibition","year":2007,"lang":"en","type":"article","venue":"NPARC","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Antifreeze protein; Selection (genetic algorithm); Antifreeze; Hydrate; Congelation","score_opus":0.009112896717597452,"score_gpt":0.21756410679407442,"score_spread":0.20845121007647696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7043146046","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9633452,0.00068314164,0.016246267,0.0007153837,0.0002316863,0.00023428592,0.001520355,0.00030270833,0.016721],"genre_scores_gemma":[0.9161363,0.0010175165,0.027354661,0.00049681653,0.000066996494,0.00018885545,0.003830503,0.0004177196,0.05049071],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997385,0.00004698804,0.000023369763,0.000045748573,0.00010502797,0.000040433082],"domain_scores_gemma":[0.99964094,0.000105953084,0.000064513835,0.00006736991,0.000069449234,0.00005181935],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034118298,0.00031992473,0.0004244996,0.00022876041,0.0002776675,0.00039744301,0.00043279998,0.00037440687,0.004959585],"category_scores_gemma":[0.00042378862,0.00021331607,0.00037477986,0.00027996744,0.00024541767,0.00020468149,0.00036324674,0.00074683456,0.000925231],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014672903,0.000055427074,0.00027740034,0.000036784164,0.000008235923,0.000039136456,0.000016812373,0.00015665422,0.9964049,0.00025395383,0.00055501,0.0020490992],"study_design_scores_gemma":[0.000034890152,0.00035126577,0.0030308047,0.000009056537,0.000025152445,0.00015174305,0.000030934378,0.0009417063,0.98382044,0.0000936468,0.011501268,0.000009207917],"about_ca_topic_score_codex":0.00127537,"about_ca_topic_score_gemma":0.002652749,"teacher_disagreement_score":0.004959585,"about_ca_system_score_codex":0.00031735082,"about_ca_system_score_gemma":0.00034374426,"threshold_uncertainty_score":0.01659143},"labels":[],"label_agreement":null},{"id":"W7043727639","doi":"","title":"TransAlta Corporation - Alberta Utilities Commission approves settlement agreement","year":2012,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Commission; Settlement (finance); Corporation; European commission; Human settlement","score_opus":0.009439502486170391,"score_gpt":0.19348884447837952,"score_spread":0.18404934199220913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7043727639","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023933584,0.00015730508,0.0024063583,0.0036252046,0.00076803827,0.00018980354,0.002128499,0.00082509464,0.9875064],"genre_scores_gemma":[0.0045963917,0.00004911653,0.00060103834,0.0005010808,0.000041351155,0.000018092307,0.00061715103,0.00013143562,0.99344444],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9961396,0.00019749554,0.00005419667,0.00021354073,0.0027840992,0.0006111039],"domain_scores_gemma":[0.9952284,0.0003865414,0.00006495681,0.00031729735,0.0035566827,0.000446055],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002849006,0.000969152,0.0007969896,0.0019819292,0.005027851,0.0064268447,0.0023792824,0.007264204,0.19961882],"category_scores_gemma":[0.0054072896,0.00068274554,0.0007389438,0.0014809881,0.0012461048,0.0014192861,0.0011634069,0.0050043827,0.065325305],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015482,0.00016827909,0.0005822407,0.000036171146,0.000009248538,0.00019747278,0.00009365124,0.0010555607,0.00072171295,0.04003556,0.92980254,0.027142784],"study_design_scores_gemma":[0.00006517754,0.00003614505,0.0015297111,0.000032363467,0.000009095027,0.00006939582,0.00014932881,0.0024561626,0.0011551381,0.003848726,0.9906255,0.000023140954],"about_ca_topic_score_codex":0.44018427,"about_ca_topic_score_gemma":0.66363376,"teacher_disagreement_score":0.55981576,"about_ca_system_score_codex":0.011677849,"about_ca_system_score_gemma":0.033605352,"threshold_uncertainty_score":0.8752442},"labels":[],"label_agreement":null},{"id":"W7043832076","doi":"","title":"Un diseño de política eléctrica basado en el modelo HRV para expansión óptima de redes de transmisión aplicaciones en Ontario y enseñanzas para México","year":2012,"lang":"es","type":"dissertation","venue":"LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Marginal product; Context (archaeology); Labor contract","score_opus":0.01509032624381715,"score_gpt":0.24797417379097508,"score_spread":0.23288384754715794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7043832076","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7001949,0.0017272411,0.12484117,0.0053827674,0.00015579691,0.0001581345,0.0021042093,0.00048249293,0.1649532],"genre_scores_gemma":[0.9713969,0.0005739418,0.003980247,0.000067948415,0.000018130391,0.000043144868,0.00023495397,0.00003567725,0.02364896],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998642,0.000033648827,0.0000029568369,0.000026188343,0.00002600465,0.000047015776],"domain_scores_gemma":[0.9998017,0.00007117729,0.000027099817,0.000011823327,0.00006354537,0.000024756311],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040049272,0.00039126968,0.00035640414,0.0003138749,0.00056143705,0.0016985582,0.00082813326,0.0007808875,0.008099371],"category_scores_gemma":[0.0011495036,0.00027920774,0.000447713,0.0003934831,0.00044820237,0.0007366303,0.00044806823,0.000670163,0.00034489643],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010233919,0.000028243703,0.007828545,0.00007258749,0.000040431238,0.00013411345,0.00018055424,0.94904995,0.0009616289,0.027744044,0.003217153,0.010640446],"study_design_scores_gemma":[0.000051440362,0.00005874763,0.0073831156,0.000039997543,0.000055588476,0.00002217862,0.00037877852,0.9770571,0.000313331,0.0051695555,0.009451775,0.000018522222],"about_ca_topic_score_codex":0.52857316,"about_ca_topic_score_gemma":0.5051368,"teacher_disagreement_score":0.47142684,"about_ca_system_score_codex":0.00566328,"about_ca_system_score_gemma":0.004190237,"threshold_uncertainty_score":0.94840634},"labels":[],"label_agreement":null},{"id":"W7044311769","doi":"","title":"Wind Power in Canada, Market Outlook to 2030, Update 2017","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Power (physics); Boom; Investment (military)","score_opus":0.0032190963081117747,"score_gpt":0.17585640769677688,"score_spread":0.17263731138866512,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7044311769","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006649459,0.042606868,0.0034763457,0.008265546,0.0032120447,0.0002163356,0.41455734,0.0023248764,0.5186913],"genre_scores_gemma":[0.040165752,0.06856493,0.00575814,0.0015198474,0.0007257179,0.0001472307,0.18852632,0.0011683983,0.6934237],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987931,0.000024117277,0.000035173252,0.000049704144,0.000929211,0.00016877239],"domain_scores_gemma":[0.9971928,0.000062693696,0.00007173665,0.000041721443,0.002444214,0.00018690356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007711639,0.0013492865,0.0006594726,0.0041936864,0.0014827471,0.0028111222,0.0012628621,0.0007655501,0.042148933],"category_scores_gemma":[0.0025364754,0.00042374415,0.0006583579,0.010089415,0.0004772689,0.0013803685,0.0007297589,0.0011960891,0.013003546],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004373791,0.000024026653,0.0014173969,0.00030018185,0.000014983435,0.000032832897,0.000026734893,0.0017710857,0.00007722206,0.0017932414,0.9349479,0.059550636],"study_design_scores_gemma":[0.00002830113,0.000011139223,0.010001293,0.0004337922,0.000032409058,0.000044796212,0.00014618506,0.0014879731,0.00032293503,0.00117298,0.9862931,0.000025151821],"about_ca_topic_score_codex":0.9797845,"about_ca_topic_score_gemma":0.9912062,"teacher_disagreement_score":0.042148933,"about_ca_system_score_codex":0.021774238,"about_ca_system_score_gemma":0.07454989,"threshold_uncertainty_score":0.1579839},"labels":[],"label_agreement":null},{"id":"W7045127249","doi":"","title":"Alberta Electricity Regulator Adopts Least Stringent Approach to Renewable Energy Pause, Industry Responds with Mixed Reactions","year":2023,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Renewable energy; Electricity; Electric power industry; Regulator; Electricity generation; Production (economics)","score_opus":0.009193958066437151,"score_gpt":0.18880790622894172,"score_spread":0.17961394816250456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045127249","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009561248,0.0008206121,0.0032092803,0.13687168,0.0030433636,0.000170232,0.0007444766,0.0005685103,0.8450105],"genre_scores_gemma":[0.07026274,0.00034540094,0.0019408647,0.06729025,0.00035258505,0.000056566445,0.00020763713,0.0001310338,0.8594129],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9956866,0.00030578996,0.00006805485,0.00028965806,0.0027420889,0.0009078247],"domain_scores_gemma":[0.99789894,0.00034399886,0.00007200734,0.00012343457,0.0012391598,0.00032239855],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025309054,0.0006354201,0.00037858897,0.0009669759,0.005183744,0.008493363,0.001681342,0.011188529,0.027898647],"category_scores_gemma":[0.0061648507,0.00039443967,0.0005421529,0.00078227196,0.0022133146,0.0012398049,0.0016951753,0.00743603,0.0036471114],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009725285,0.00009650844,0.0021900996,0.00004867832,0.00001681418,0.00044562068,0.00022208449,0.0019987624,0.002260389,0.1963377,0.7706369,0.025649192],"study_design_scores_gemma":[0.00006421614,0.00005286897,0.006649424,0.000079422665,0.00001675728,0.00012290035,0.00073200464,0.0025725684,0.0020335645,0.02193401,0.9656752,0.00006699479],"about_ca_topic_score_codex":0.5572838,"about_ca_topic_score_gemma":0.8384448,"teacher_disagreement_score":0.44271618,"about_ca_system_score_codex":0.0156188505,"about_ca_system_score_gemma":0.045332197,"threshold_uncertainty_score":0.8906469},"labels":[],"label_agreement":null},{"id":"W7045512901","doi":"","title":"Ballard Announces Sales Agreement With M-Field For Clean Baseload Power Systems -- VANCOUVER, Jan. 9, 2014","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Electric power system; Base load power plant; Measure (data warehouse); Power grid","score_opus":0.003716174954356592,"score_gpt":0.18251475949001544,"score_spread":0.17879858453565886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045512901","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0039396393,0.00091379875,0.0031104302,0.0079196915,0.0016995723,0.00012766913,0.0043101427,0.0018053142,0.9761737],"genre_scores_gemma":[0.0062395213,0.0001504713,0.00042195467,0.0003616396,0.000060515344,0.000010123579,0.00076641364,0.0002455792,0.9917436],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990435,0.000044361546,0.000013426575,0.000085531465,0.00065345975,0.00015967104],"domain_scores_gemma":[0.99865377,0.00012186185,0.000025607878,0.00007326833,0.000895736,0.00022975747],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00096907077,0.00063184084,0.00062710914,0.0010661981,0.0028336209,0.004303164,0.0010267211,0.0028101078,0.32500952],"category_scores_gemma":[0.0018982186,0.0003912417,0.0004936151,0.0009694365,0.0006544274,0.0010493776,0.00081282575,0.0029906086,0.10005953],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014753603,0.000096321295,0.0005277713,0.000047816928,0.000007833476,0.00011535914,0.000028704044,0.00056701776,0.0008918503,0.008614187,0.962541,0.026414623],"study_design_scores_gemma":[0.000030037587,0.00004775346,0.0017606834,0.000027256994,0.000005228399,0.00004285282,0.00007889638,0.0013995639,0.0011849077,0.001664385,0.9937447,0.000013745811],"about_ca_topic_score_codex":0.13633466,"about_ca_topic_score_gemma":0.4572821,"teacher_disagreement_score":0.32500952,"about_ca_system_score_codex":0.003549818,"about_ca_system_score_gemma":0.0053695017,"threshold_uncertainty_score":0.962792},"labels":[],"label_agreement":null},{"id":"W7045584575","doi":"","title":"Canada Wind Power Industry Report 2023: Renewable Power, Power Generation, Installed Capacity, Deal Analysis 2010-2035","year":2023,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Renewable energy; Power (physics); Electric power industry; Production (economics)","score_opus":0.01147624453864317,"score_gpt":0.1999261066944721,"score_spread":0.18844986215582893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045584575","genre_codex":"dataset","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0071206996,0.0028552527,0.0018956024,0.0035441022,0.0006558544,0.00027076298,0.7950032,0.0010195203,0.18763505],"genre_scores_gemma":[0.03284302,0.0060147936,0.0057848864,0.00082159694,0.0001604869,0.00018742951,0.3596216,0.00090878585,0.5936573],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99832934,0.00004125915,0.000036674748,0.00007135866,0.0013007022,0.00022078124],"domain_scores_gemma":[0.9967998,0.00009064476,0.00008971688,0.000057217592,0.0027794798,0.00018312353],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009583005,0.0014956995,0.0008879026,0.0037594403,0.001947342,0.002787428,0.0017013298,0.0010921541,0.0429843],"category_scores_gemma":[0.0020529972,0.0007647069,0.0007482201,0.012107484,0.00040958484,0.0010855482,0.0005638946,0.0014783329,0.014198726],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000073356685,0.0000474379,0.0024395036,0.00015186268,0.00002860469,0.00004577311,0.000031711974,0.0027489509,0.0002032783,0.0026591062,0.9764262,0.015144347],"study_design_scores_gemma":[0.00008713871,0.000024133247,0.049659032,0.00017017625,0.000055096654,0.000054987788,0.00032422753,0.007563635,0.0018470873,0.0019723168,0.9381577,0.00008451268],"about_ca_topic_score_codex":0.99127793,"about_ca_topic_score_gemma":0.99525946,"teacher_disagreement_score":0.0429843,"about_ca_system_score_codex":0.03614418,"about_ca_system_score_gemma":0.0815219,"threshold_uncertainty_score":0.2622456},"labels":[],"label_agreement":null},{"id":"W7045634738","doi":"","title":"Canada’s Leading Renewable Energy Stock Combines Growth With High Yield","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Stock (firearms); Renewable energy; Yield (engineering); Energy consumption; Work (physics)","score_opus":0.0043814032454028585,"score_gpt":0.15138808799765152,"score_spread":0.14700668475224865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045634738","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016828613,0.002262518,0.0069914972,0.010515522,0.0006929078,0.00009866009,0.0108140595,0.0012822065,0.9505141],"genre_scores_gemma":[0.25279704,0.003998484,0.010867664,0.0016296318,0.00022263522,0.000043115007,0.0068346947,0.0008303275,0.7227764],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994537,0.000021631133,0.0000058056894,0.00002898162,0.00039135,0.000098449156],"domain_scores_gemma":[0.9990107,0.000047844445,0.000025083558,0.000035263685,0.00070785277,0.00017315614],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052091037,0.000642612,0.0002381272,0.0011951375,0.0014936123,0.003034615,0.00064406695,0.0005858503,0.04193701],"category_scores_gemma":[0.0016815996,0.00018762937,0.0003480857,0.0015802039,0.00055629294,0.0006189818,0.0006721187,0.0008094566,0.004261293],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000097734046,0.00007921064,0.0041141273,0.00018990827,0.00003414695,0.00009132491,0.00006136447,0.009764801,0.001249469,0.09611063,0.709206,0.17900127],"study_design_scores_gemma":[0.000053169057,0.00003753819,0.009539044,0.00016830348,0.00003378548,0.000059868296,0.00024297727,0.018157959,0.0031543397,0.020671511,0.9478484,0.000033107564],"about_ca_topic_score_codex":0.9095143,"about_ca_topic_score_gemma":0.96943766,"teacher_disagreement_score":0.09048569,"about_ca_system_score_codex":0.019367998,"about_ca_system_score_gemma":0.0435251,"threshold_uncertainty_score":0.18203712},"labels":[],"label_agreement":null},{"id":"W7045654264","doi":"","title":"Blackstone preps $7B in new funding for Canada-to-NYC hydropower line","year":2022,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Line (geometry); Work (physics); Government (linguistics)","score_opus":0.007582794504543528,"score_gpt":0.21420066398915538,"score_spread":0.20661786948461186,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045654264","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023044206,0.00033108183,0.001491129,0.006098922,0.0035294942,0.0003480653,0.008677137,0.0020490007,0.97517085],"genre_scores_gemma":[0.0021409427,0.000080212,0.00033363551,0.0006996323,0.00013607512,0.00003266086,0.0014435558,0.0003218222,0.99481153],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99861526,0.0000596521,0.00002057026,0.00008249601,0.0008983898,0.00032361236],"domain_scores_gemma":[0.9970065,0.0001929791,0.000043020424,0.00017076111,0.0014813278,0.0011053798],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0012440758,0.0011386886,0.0007282606,0.0027635007,0.004178258,0.0041963933,0.0012446536,0.003304743,0.6373365],"category_scores_gemma":[0.0034845404,0.0008844193,0.0010300212,0.0008548118,0.0011106599,0.0011909826,0.0021403814,0.0032351066,0.33696908],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006912841,0.000054197917,0.0001500521,0.000015569753,0.0000032809228,0.000029598059,0.000010052854,0.0001437307,0.00021616138,0.0016139323,0.9829207,0.014773528],"study_design_scores_gemma":[0.00006048182,0.00003282765,0.0009437519,0.000027867136,0.000003933472,0.000021373344,0.0000694387,0.0006053353,0.00019234963,0.00075498095,0.99727577,0.000011985461],"about_ca_topic_score_codex":0.3562287,"about_ca_topic_score_gemma":0.6690317,"teacher_disagreement_score":0.6437713,"about_ca_system_score_codex":0.0068365578,"about_ca_system_score_gemma":0.021176789,"threshold_uncertainty_score":0.7083105},"labels":[],"label_agreement":null},{"id":"W7045659258","doi":"","title":"A $4B powerline will run under Lake Champlain, power NYC, and impact Quebec","year":2022,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Line (geometry); Field (mathematics); Power grid; Hydrology (agriculture)","score_opus":0.003431192633069012,"score_gpt":0.20019689245522246,"score_spread":0.19676569982215344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045659258","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031162472,0.00025152368,0.0009824105,0.0033792288,0.00087853457,0.000171778,0.006892022,0.0007672492,0.9835609],"genre_scores_gemma":[0.0033306202,0.000055005436,0.0001871688,0.0003305035,0.00002204211,0.000016957778,0.00088287966,0.00013549784,0.9950393],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99955374,0.000019176296,0.0000048313937,0.00003975229,0.00020003782,0.00018241619],"domain_scores_gemma":[0.99907,0.000033530836,0.000014827996,0.000038449674,0.0005970348,0.00024618083],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00047895813,0.0010381152,0.0004057975,0.0010190974,0.003943756,0.0027779448,0.0007912332,0.0023374176,0.450598],"category_scores_gemma":[0.00097354566,0.00048076143,0.0006109457,0.00070767704,0.00064854167,0.0008429604,0.00077486836,0.0021373252,0.115963645],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006500461,0.0000693879,0.00081957056,0.000027990149,0.0000048466177,0.000043834658,0.000018038772,0.00044618233,0.00037725456,0.0047695786,0.9685513,0.024807142],"study_design_scores_gemma":[0.00004361076,0.00003742084,0.004486507,0.000036378955,0.0000054379093,0.000028119546,0.00011620156,0.0016766108,0.00037799298,0.00067055156,0.99250597,0.000015239713],"about_ca_topic_score_codex":0.8461967,"about_ca_topic_score_gemma":0.96263266,"teacher_disagreement_score":0.450598,"about_ca_system_score_codex":0.013700066,"about_ca_system_score_gemma":0.022066606,"threshold_uncertainty_score":0.7836553},"labels":[],"label_agreement":null},{"id":"W7045797346","doi":"","title":"Canada Power Market Outlook to 2030, Update 2018-Market Trends, Regulations, and Competitive Landscape – World Gazette","year":2020,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Market power; Competition (biology); Government (linguistics); Market competition","score_opus":0.0027701007035345693,"score_gpt":0.16796273201317236,"score_spread":0.1651926313096378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045797346","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034797462,0.032055926,0.0019264445,0.019806467,0.004541031,0.00017138751,0.23088,0.0018260458,0.70531297],"genre_scores_gemma":[0.023242753,0.047823444,0.0036594616,0.0033200195,0.0007631149,0.000100299134,0.103630766,0.0008509512,0.8166092],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987387,0.000023070592,0.000025531752,0.000043450113,0.0010216124,0.0001476572],"domain_scores_gemma":[0.9962763,0.00008103422,0.000092463706,0.000046634617,0.003234702,0.00026877198],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007659843,0.00116427,0.000510757,0.003923457,0.0021036263,0.004191925,0.001298005,0.0010651337,0.07576],"category_scores_gemma":[0.002716118,0.0003741682,0.00050426717,0.011848018,0.00069538126,0.002087269,0.00091875193,0.00168143,0.02281204],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012679112,0.000011271144,0.00037927544,0.000090703405,0.000003085579,0.000015791904,0.00001419981,0.00026830382,0.000044065146,0.001871577,0.97318643,0.024102682],"study_design_scores_gemma":[0.000007340531,0.000005207197,0.0034900026,0.00019182095,0.0000072345465,0.000022384014,0.00008819923,0.00035379943,0.00015648984,0.000867407,0.99479645,0.000013680229],"about_ca_topic_score_codex":0.97108465,"about_ca_topic_score_gemma":0.9881236,"teacher_disagreement_score":0.07576,"about_ca_system_score_codex":0.030103609,"about_ca_system_score_gemma":0.07906357,"threshold_uncertainty_score":0.25344247},"labels":[],"label_agreement":null},{"id":"W7045928022","doi":"","title":"Capital Power Reports Third Quarter 2014 Results - Earnings News (EARNINGS) News","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Earnings; Quarter (Canadian coin); Power (physics); Capital (architecture)","score_opus":0.0032049251433559564,"score_gpt":0.1859848507065288,"score_spread":0.18277992556317282,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045928022","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00201384,0.0012516173,0.001075204,0.012368957,0.008246124,0.00013763327,0.077862225,0.0027925265,0.8942518],"genre_scores_gemma":[0.0063100816,0.0010509974,0.0004124429,0.0011539625,0.0016125017,0.00006385686,0.02853079,0.00085757417,0.9600077],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99851257,0.00007059705,0.000058608446,0.00010309633,0.0010802039,0.00017497233],"domain_scores_gemma":[0.99696404,0.00028642773,0.00028569062,0.00025279357,0.001801421,0.00040960815],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0013101802,0.0011381486,0.0006074394,0.0035868238,0.001044777,0.0064423312,0.0008991135,0.001788232,0.32703274],"category_scores_gemma":[0.00568166,0.00046121047,0.00066658633,0.0030424397,0.00033771418,0.0020936949,0.001002278,0.0022871916,0.22193244],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024140338,0.000022304732,0.00016048185,0.000015118137,0.0000026476625,0.0000080533,0.00000225226,0.00007363788,0.000025360116,0.00096606626,0.9892057,0.009494282],"study_design_scores_gemma":[0.000043100812,0.000031861207,0.0045736544,0.00008594949,0.000012329738,0.000017256949,0.000028302753,0.0007053462,0.00064523256,0.0025553855,0.9912806,0.000020937978],"about_ca_topic_score_codex":0.026276259,"about_ca_topic_score_gemma":0.03441232,"teacher_disagreement_score":0.32703274,"about_ca_system_score_codex":0.002535753,"about_ca_system_score_gemma":0.0027093915,"threshold_uncertainty_score":0.9599061},"labels":[],"label_agreement":null},{"id":"W7066373450","doi":"","title":"Hydropower from Quebec is worth pursuing, despite concerns about power lines - Editorials","year":2013,"lang":"en","type":"other","venue":"The Boston globe","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Electric power transmission; Power (physics); Line (geometry); Government (linguistics)","score_opus":0.005742683703475134,"score_gpt":0.21653081657215298,"score_spread":0.21078813286867784,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7066373450","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000780165,0.011929498,0.0009773719,0.120337404,0.68042576,0.000113541435,0.0011713619,0.0005340992,0.18373077],"genre_scores_gemma":[0.0063972357,0.008012503,0.0007212195,0.019161828,0.20220034,0.000034495195,0.00048049554,0.00030827263,0.76268363],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99802387,0.00011422445,0.00008530184,0.00014118296,0.0014526277,0.00018278412],"domain_scores_gemma":[0.9885992,0.0014949125,0.0003443685,0.0003455028,0.007817958,0.0013981505],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017966594,0.0012107798,0.0008800136,0.002192853,0.0026744148,0.0051670424,0.0015959061,0.005105112,0.074241206],"category_scores_gemma":[0.0081038615,0.00027338782,0.0006501346,0.0019150322,0.0010895614,0.0017818894,0.0005740244,0.0044440906,0.016738722],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007878194,0.000005920454,0.00003990885,0.000040848874,0.0000022764339,0.0000385497,0.000005780627,0.000058285354,0.00004528031,0.00052257616,0.9926766,0.006556068],"study_design_scores_gemma":[0.0000050747162,0.000007901013,0.0004168472,0.00008630898,0.000004579079,0.000027072188,0.000034358,0.00015170973,0.00006631918,0.00046809058,0.9987262,0.0000055807777],"about_ca_topic_score_codex":0.11138935,"about_ca_topic_score_gemma":0.4440012,"teacher_disagreement_score":0.88861066,"about_ca_system_score_codex":0.0059308554,"about_ca_system_score_gemma":0.008443131,"threshold_uncertainty_score":0.24836159},"labels":[],"label_agreement":null},{"id":"W7066584009","doi":"","title":"Hydrostor Secures Funding to Advance Long Duration Energy Storage in Canada","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Duration (music); Government (linguistics); Work (physics); Subsidy; Order (exchange)","score_opus":0.003469791070888807,"score_gpt":0.17999650362322372,"score_spread":0.17652671255233493,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7066584009","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03399348,0.0012635275,0.0054189367,0.02579372,0.0015262724,0.00025757772,0.02138408,0.002031711,0.90833074],"genre_scores_gemma":[0.10964995,0.00085838104,0.0022695356,0.0016451017,0.00011057759,0.000054946413,0.004043073,0.000382912,0.8809855],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999298,0.000020023672,0.000007875715,0.0000292826,0.00039991376,0.00024497756],"domain_scores_gemma":[0.99757856,0.00011441929,0.000038802325,0.00008681729,0.0016231635,0.00055836607],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006971705,0.00038823648,0.0002826408,0.0007529176,0.003008053,0.0018655981,0.0008952662,0.0013943425,0.099770635],"category_scores_gemma":[0.0019831443,0.00024102886,0.00048260216,0.00077569287,0.0008336397,0.00076888327,0.0013326248,0.0010706736,0.009289351],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032045972,0.00008593897,0.0030861062,0.00012637259,0.000020838606,0.00020656938,0.00010955802,0.004544108,0.0019569993,0.043051884,0.8566846,0.089806505],"study_design_scores_gemma":[0.00012490718,0.00005381965,0.0072395676,0.00013560409,0.000011994423,0.00007058764,0.0004210736,0.009960033,0.0024694693,0.008104437,0.97136927,0.00003927052],"about_ca_topic_score_codex":0.95387113,"about_ca_topic_score_gemma":0.9774417,"teacher_disagreement_score":0.099770635,"about_ca_system_score_codex":0.021722104,"about_ca_system_score_gemma":0.105442934,"threshold_uncertainty_score":0.33376604},"labels":[],"label_agreement":null},{"id":"W7070794706","doi":"","title":"Pre-Market Technical Pulse on Electric Utilities Stocks -- Entergy, Great Plains Energy, Atlantica Yield, and Companhia Energetica de Minas Gerais | Home","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pulse (music); Quarter (Canadian coin); Exclosure","score_opus":0.006523447194588696,"score_gpt":0.20566963812219433,"score_spread":0.19914619092760563,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7070794706","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014920392,0.0034130032,0.0020645559,0.04098899,0.011832677,0.00007678374,0.0194594,0.0011850123,0.9060592],"genre_scores_gemma":[0.0597572,0.003770453,0.0015105814,0.0032733858,0.0036450436,0.000047523194,0.00909051,0.0007962718,0.9181091],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99959224,0.000030741998,0.0000111549925,0.000024847383,0.0002849311,0.000056006404],"domain_scores_gemma":[0.9982551,0.0003470102,0.00007630781,0.00013662066,0.0009892824,0.00019569276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000994151,0.0004301784,0.00023735697,0.0010089249,0.0007660905,0.0024945163,0.00050397025,0.0010528939,0.094145015],"category_scores_gemma":[0.0033587264,0.0002058362,0.0002526406,0.0013891575,0.0003557873,0.0015296465,0.0008459545,0.0014676376,0.012358226],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009687174,0.000064689586,0.0015915734,0.00007571964,0.000006218364,0.0000820808,0.000057542966,0.0005727945,0.00040259122,0.011761744,0.9396864,0.045601755],"study_design_scores_gemma":[0.00003188342,0.000054696146,0.023906628,0.00022668157,0.0000086546825,0.000051967683,0.00024646515,0.0011462022,0.0016443231,0.0052562486,0.9674082,0.000018040624],"about_ca_topic_score_codex":0.03532057,"about_ca_topic_score_gemma":0.111952454,"teacher_disagreement_score":0.094145015,"about_ca_system_score_codex":0.0019520387,"about_ca_system_score_gemma":0.0028283023,"threshold_uncertainty_score":0.31494647},"labels":[],"label_agreement":null},{"id":"W7070870019","doi":"","title":"Projecting and Forecasting Stochastic Volatility Characteristics for the Nasdaq OMX Nordic/Baltic Financial Electricity Markets","year":2021,"lang":"en","type":"article","venue":"Duo Research Archive (University of Oslo)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volatility (finance); Stochastic volatility; Forward volatility; Implied volatility; Volatility swap; Volatility smile; Kalman filter; Quarter (Canadian coin); Mean reversion","score_opus":0.02925121051600285,"score_gpt":0.24112048030460875,"score_spread":0.2118692697886059,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7070870019","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9391317,0.00015036747,0.057894442,0.00018268864,0.000026491089,0.000020816029,0.00043195824,0.0001096744,0.0020517206],"genre_scores_gemma":[0.9889109,0.00009382734,0.010007405,0.0000101857295,0.0000073111246,0.000009092423,0.00042118182,0.000022794606,0.00051727827],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998016,0.000074729855,0.000012974663,0.00003463825,0.00005302082,0.000023034345],"domain_scores_gemma":[0.9997266,0.00013454199,0.000060449976,0.000023159464,0.00004217196,0.000013111405],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009399129,0.0003835301,0.00028064518,0.0004353431,0.00022898302,0.0010676084,0.00039911835,0.0003855259,0.00055929204],"category_scores_gemma":[0.002045804,0.00029165408,0.00040080707,0.00039762474,0.0001886875,0.00063980423,0.00039351202,0.00057712087,0.00008092835],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026325777,0.00001840054,0.0065844306,0.000013211289,0.000022208882,0.00007005421,0.000032167285,0.9814695,0.0006646469,0.0023960036,0.00029952583,0.008403423],"study_design_scores_gemma":[0.0000035452254,0.000008345885,0.0033317655,0.0000027850526,0.000003377127,0.000008591535,0.000016023967,0.9952761,0.0002976572,0.0008999452,0.000145772,0.0000060807884],"about_ca_topic_score_codex":0.026206248,"about_ca_topic_score_gemma":0.023917828,"teacher_disagreement_score":0.026206248,"about_ca_system_score_codex":0.0007050208,"about_ca_system_score_gemma":0.0009314323,"threshold_uncertainty_score":0.052107453},"labels":[],"label_agreement":null},{"id":"W7071034267","doi":"","title":"RE Royalties Provides $6.3 Million Financing for a 200 Megawatt Solar Project in Alberta, Canada","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Investment (military); Work (physics); Payment","score_opus":0.006302046186512186,"score_gpt":0.20016690633054007,"score_spread":0.19386486014402787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7071034267","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016844276,0.0019183676,0.0026612189,0.015713034,0.0018846048,0.000213204,0.010604422,0.001955486,0.94820535],"genre_scores_gemma":[0.029597724,0.000733231,0.0009403817,0.0005407167,0.00006145224,0.000018193043,0.0030022056,0.00022739492,0.9648787],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99912673,0.000034396075,0.000009418343,0.000056527417,0.00049639895,0.00027651247],"domain_scores_gemma":[0.99825126,0.000063498395,0.00001841412,0.000044510805,0.0009827933,0.0006394936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071758893,0.0007768473,0.00034555304,0.0013043402,0.0040852283,0.0025812762,0.0009926656,0.0016902551,0.15080422],"category_scores_gemma":[0.0012747559,0.0004578692,0.0005413198,0.0010065692,0.00075226603,0.00060816953,0.0013204883,0.0015354911,0.023577036],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001412519,0.00008136618,0.0024431164,0.00007072534,0.000016921987,0.0002994672,0.00009097081,0.0013782674,0.0014282138,0.00883832,0.91280466,0.07240671],"study_design_scores_gemma":[0.000061941086,0.000038093673,0.008453009,0.000054938446,0.000011312576,0.00013376468,0.00037920853,0.0028233272,0.00082570914,0.0010317963,0.98615927,0.000027634036],"about_ca_topic_score_codex":0.9518084,"about_ca_topic_score_gemma":0.97714466,"teacher_disagreement_score":0.15080422,"about_ca_system_score_codex":0.018962186,"about_ca_system_score_gemma":0.06698291,"threshold_uncertainty_score":0.5044904},"labels":[],"label_agreement":null},{"id":"W7072106512","doi":"","title":"Washington regulators receive proposed terms for Avista’s sale to Canadian utility","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Legislation; Work (physics); Payment","score_opus":0.007130864201178315,"score_gpt":0.20788596578499016,"score_spread":0.20075510158381185,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7072106512","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0006553487,0.00016336537,0.00084179715,0.002688337,0.00091556244,0.000117534095,0.0015939266,0.00082001137,0.99220407],"genre_scores_gemma":[0.0017279165,0.000063195395,0.00016040524,0.00036502423,0.00008859136,0.00001891634,0.0002564755,0.00016109832,0.9971584],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976503,0.00009140497,0.000037587473,0.00014864346,0.0016541643,0.00041788482],"domain_scores_gemma":[0.9958066,0.0003811392,0.00007978426,0.00036716688,0.0029227138,0.00044262808],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0013441215,0.0010205233,0.0009002854,0.0027915533,0.0064739645,0.0065013985,0.0016978573,0.007639249,0.4251002],"category_scores_gemma":[0.0062932107,0.0008874852,0.0009924443,0.0016735316,0.001623283,0.0017786454,0.001289456,0.0052749077,0.21978024],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033911772,0.00006803976,0.00017393824,0.000022927805,0.0000040143323,0.000053182604,0.000035949754,0.00020485632,0.00025733415,0.0105825225,0.97279537,0.015767949],"study_design_scores_gemma":[0.000026779784,0.000016596354,0.000940797,0.00004010881,0.000005323016,0.000030607836,0.000086082495,0.00058988814,0.00035301578,0.00174379,0.99615014,0.000016967242],"about_ca_topic_score_codex":0.3381186,"about_ca_topic_score_gemma":0.68870616,"teacher_disagreement_score":0.6618814,"about_ca_system_score_codex":0.010303286,"about_ca_system_score_gemma":0.020272555,"threshold_uncertainty_score":0.8200248},"labels":[],"label_agreement":null},{"id":"W7072622672","doi":"","title":"Wind Power in Canada, Market Outlook to 2025, Update 2014 - Capacity, Generation","year":2015,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Power (physics); Investment (military); Boom; Electricity generation; Renewable energy","score_opus":0.008542654048550608,"score_gpt":0.18290370481305154,"score_spread":0.17436105076450092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7072622672","genre_codex":"dataset","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012468761,0.025669793,0.003512963,0.007422088,0.0017525443,0.00021661691,0.60483927,0.001991332,0.34212658],"genre_scores_gemma":[0.07808234,0.03759698,0.008040642,0.0014820617,0.00042059098,0.00012363677,0.3035413,0.0010725739,0.5696398],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99874204,0.000028593045,0.00003678471,0.000055823486,0.0009445619,0.00019220637],"domain_scores_gemma":[0.9977222,0.000049671307,0.000053667045,0.000036753878,0.0019753692,0.00016235019],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008198774,0.0012780464,0.0006006162,0.003706073,0.001551771,0.0025422608,0.0014559986,0.0007174309,0.027713954],"category_scores_gemma":[0.0022375835,0.00047663876,0.0007283186,0.010396415,0.00040820378,0.0011722104,0.0007068571,0.001131184,0.0068172687],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000074410746,0.00004350734,0.0038161974,0.00034478493,0.000032627442,0.0000469058,0.000038000977,0.0054929196,0.00013028245,0.0028146566,0.92634755,0.06081817],"study_design_scores_gemma":[0.000056097946,0.000023522662,0.040123153,0.00052478403,0.000064998894,0.000065200365,0.00031753414,0.0065494017,0.00078900234,0.0020804936,0.949345,0.0000607751],"about_ca_topic_score_codex":0.9913066,"about_ca_topic_score_gemma":0.99640214,"teacher_disagreement_score":0.031915065,"about_ca_system_score_codex":0.031915065,"about_ca_system_score_gemma":0.08608158,"threshold_uncertainty_score":0.23156112},"labels":[],"label_agreement":null},{"id":"W7073808996","doi":"","title":"Value of pumped-storage hydro for wind power integration in the British Columbia hydroelectric system","year":2010,"lang":"en","type":"other","venue":"cIRcle (University of British Columbia)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"BC Hydro","keywords":"Wind power; Hydropower; Exclosure; Intellectualization; Scale (ratio); Production (economics)","score_opus":0.0030546862842751104,"score_gpt":0.14926630277082217,"score_spread":0.14621161648654707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7073808996","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96454006,0.00049030065,0.0054151393,0.0012828524,0.000050503077,0.00011030612,0.0010234924,0.00022483636,0.026862418],"genre_scores_gemma":[0.99631786,0.00012632877,0.001280869,0.000034815035,0.0000037955758,0.000013985673,0.00015499705,0.000016047197,0.0020512284],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99958116,0.00014891113,0.000014215929,0.000055390574,0.000120109966,0.000080213256],"domain_scores_gemma":[0.9991229,0.00038075584,0.00006382834,0.000038744092,0.00027045349,0.0001232684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008261344,0.00086145743,0.0006065195,0.00052352686,0.0012425362,0.0029336615,0.00077957066,0.0007673936,0.0025777747],"category_scores_gemma":[0.00222461,0.0006073513,0.00045867698,0.00060470705,0.00070058263,0.0011696032,0.0006246566,0.0011055345,0.00013618884],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016313905,0.000039144183,0.0044484893,0.000044342087,0.000039741164,0.00026382128,0.00003157649,0.985754,0.0007800104,0.0017263287,0.0007081593,0.00600125],"study_design_scores_gemma":[0.000038015503,0.00008777457,0.004172008,0.00002444514,0.00005810941,0.00001968175,0.00014796041,0.99316895,0.00060325826,0.0007448766,0.00090701453,0.000027917278],"about_ca_topic_score_codex":0.5819792,"about_ca_topic_score_gemma":0.644455,"teacher_disagreement_score":0.98943937,"about_ca_system_score_codex":0.010560653,"about_ca_system_score_gemma":0.010629153,"threshold_uncertainty_score":0.84096515},"labels":[],"label_agreement":null},{"id":"W7084060017","doi":"10.6084/m9.figshare.29964686.v1","title":"Additional file 2 of NOURISH-US: a mixed-methods, randomized crossover study of a program designed to reduce the financial burden of food allergy","year":2025,"lang":"en","type":"article","venue":"Figshare","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Winnipeg; University of British Columbia; McGill University; University of Manitoba; Children's Hospital Research Institute of Manitoba","funders":"","keywords":"Food allergy; Food aid; Crossover study; Food and drug administration; Crossover","score_opus":0.010498561393261009,"score_gpt":0.26913048455834754,"score_spread":0.25863192316508654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7084060017","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008247913,0.00034457026,0.00396614,0.0013507992,0.0004955314,0.049820367,0.9234904,0.0010793045,0.011204939],"genre_scores_gemma":[0.123666406,0.0008692259,0.04478263,0.0046340018,0.00091971725,0.5333468,0.19706808,0.0014545929,0.09325856],"study_design_codex":"not_applicable","study_design_gemma":"randomized_trial","domain_scores_codex":[0.9983929,0.0008023829,0.00018373867,0.00024943126,0.00016816807,0.00020338832],"domain_scores_gemma":[0.97589713,0.01895147,0.0018505438,0.0010014736,0.0013219881,0.0009772865],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0031192994,0.0018210869,0.0025505498,0.0011867406,0.0015131083,0.0014923455,0.0023721817,0.0023611607,0.87104243],"category_scores_gemma":[0.03110906,0.0012729979,0.0016098522,0.0015968592,0.0005905984,0.0017641953,0.0006947675,0.0019016613,0.055407852],"study_design_candidate":"randomized_trial","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.08800777,0.008274947,0.0022328643,0.017333537,0.00095089537,0.00017058846,0.00030566863,0.002697982,0.00038544388,0.0060442914,0.82771903,0.04587698],"study_design_scores_gemma":[0.8163161,0.0105768535,0.012617326,0.0037749829,0.0012204088,0.00021131625,0.00028456273,0.004888348,0.0010056953,0.010289617,0.13862197,0.0001928092],"about_ca_topic_score_codex":0.0055600926,"about_ca_topic_score_gemma":0.010132415,"teacher_disagreement_score":0.87104243,"about_ca_system_score_codex":0.0015651323,"about_ca_system_score_gemma":0.0027307605,"threshold_uncertainty_score":0.18394232},"labels":[],"label_agreement":null},{"id":"W7084671977","doi":"10.5281/zenodo.17272123","title":"Carbon Taxation in India: A Policy Feasibility Study","year":2025,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Carbon tax; Enforcement; Government (linguistics); Revenue; Greenhouse gas; Order (exchange); Tax revenue; Baseline (sea)","score_opus":0.016138649541448814,"score_gpt":0.24852099527495897,"score_spread":0.23238234573351016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7084671977","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8871531,0.0005459998,0.0027372935,0.0038707657,0.00010091257,0.0010457198,0.0019084144,0.000121497185,0.102516346],"genre_scores_gemma":[0.9930356,0.0005611948,0.0016674116,0.00033562732,0.00003258667,0.00022308336,0.00047185872,0.000011218529,0.0036614884],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9964958,0.0015784362,0.00013824842,0.00017138805,0.00049511495,0.0011210203],"domain_scores_gemma":[0.9916397,0.0053249323,0.0005180943,0.00040985103,0.0014091694,0.00069817743],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035847505,0.00044634772,0.0006045019,0.0018137471,0.0016389412,0.0034602438,0.0014117708,0.0012583548,0.006206713],"category_scores_gemma":[0.005723307,0.00027331017,0.0009882367,0.0029063397,0.0009514223,0.0015481432,0.0015648826,0.001810946,0.00074669014],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.008508404,0.0144748455,0.15437917,0.0039890106,0.00060702435,0.014844468,0.0046918057,0.26646572,0.010529102,0.33501902,0.033060763,0.15343067],"study_design_scores_gemma":[0.0045984127,0.01924756,0.3262955,0.0013321064,0.0028946204,0.0050356756,0.0775366,0.30212364,0.022926023,0.06901429,0.16804743,0.00094816496],"about_ca_topic_score_codex":0.07313677,"about_ca_topic_score_gemma":0.045008935,"teacher_disagreement_score":0.07313677,"about_ca_system_score_codex":0.008187739,"about_ca_system_score_gemma":0.012661223,"threshold_uncertainty_score":0.14542216},"labels":[],"label_agreement":null},{"id":"W7084918131","doi":"10.6084/m9.figshare.30286912.v1","title":"Comprehensive Global Dataset of SARS-CoV-2 Lineages and Spike Mutations for Therapeutic and Vaccine Research (734 Cities, 2019 - 2025 Q1, n=9.4 Million Approx.)","year":2025,"lang":"en","type":"dataset","venue":"Figshare","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Spike (software development); Spike train; Mutation; Quarter (Canadian coin); Genomics; Feature (linguistics)","score_opus":0.08907422692893774,"score_gpt":0.36731139406957963,"score_spread":0.2782371671406419,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7084918131","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00024108714,0.00011882177,0.000043821736,0.00008439091,0.000019831428,0.0000073989318,0.9989285,0.000059602105,0.00049656036],"genre_scores_gemma":[0.00084878114,0.00013305202,0.0001506882,0.0000786616,0.000010396583,0.00003673987,0.9984201,0.000016276514,0.00030533472],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99912745,0.00014269941,0.00016431889,0.00024922565,0.00016879184,0.00014754149],"domain_scores_gemma":[0.9975526,0.0005523385,0.0003559319,0.00022782215,0.0010135563,0.0002978465],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008534132,0.0011138889,0.0013890497,0.0021999269,0.00057065143,0.0015167024,0.0016766214,0.0013981103,0.047077466],"category_scores_gemma":[0.004871798,0.0004670624,0.0014301424,0.0070742513,0.0002117886,0.00089170807,0.0014710734,0.001347488,0.03913683],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015560394,0.000020963444,0.004808705,0.0010391666,0.00007840406,0.000051693536,0.000022324943,0.00035508955,0.0001950369,0.00042007255,0.9870832,0.0057698237],"study_design_scores_gemma":[0.0005256276,0.00006523296,0.035196245,0.0013222721,0.0001698426,0.00018214244,0.00022926074,0.000884484,0.00046551012,0.0011734194,0.95973545,0.00005053361],"about_ca_topic_score_codex":0.051267155,"about_ca_topic_score_gemma":0.06416694,"teacher_disagreement_score":0.051267155,"about_ca_system_score_codex":0.001535529,"about_ca_system_score_gemma":0.0036610535,"threshold_uncertainty_score":0.15748984},"labels":[],"label_agreement":null},{"id":"W7086646392","doi":"","title":"Wind and solar energy curtailment: A review of international experience","year":2016,"lang":"en","type":"article","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Renewable energy; Wind power; Variable renewable energy; Solar energy; Photovoltaic system; Intermittent energy source; Grid parity; Energy development","score_opus":0.011401241735786855,"score_gpt":0.26319251361617585,"score_spread":0.25179127188038897,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7086646392","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015958888,0.9940382,0.0003388879,0.00074008317,0.00016125415,0.000003543586,0.000033932352,0.0000076166525,0.0030805597],"genre_scores_gemma":[0.00637642,0.9926091,0.0002186633,0.00022991766,0.00017727648,0.000003042439,0.000034985092,0.0000064962887,0.00034400666],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993311,0.00013185156,0.00015138756,0.00012885928,0.00020795633,0.000048740854],"domain_scores_gemma":[0.99657947,0.0019504272,0.0005817069,0.00006592656,0.0006922326,0.00013024744],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016871226,0.00075879367,0.0011923522,0.0032108678,0.00024780445,0.0017743676,0.00065200665,0.00089167536,0.0016105123],"category_scores_gemma":[0.0029564619,0.00036087635,0.00053363794,0.009271048,0.0006894985,0.0022541261,0.0005286459,0.0010083824,0.00056771166],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012508668,0.000095797404,0.0034061708,0.019120315,0.00016146114,0.00021511066,0.00063302735,0.0025333753,0.00077399646,0.0051066354,0.0260819,0.9417471],"study_design_scores_gemma":[0.000018150502,0.00030089368,0.020891031,0.017515156,0.00034550077,0.0012060588,0.0016254365,0.0005869039,0.001030861,0.0020772791,0.95433646,0.00006616713],"about_ca_topic_score_codex":0.0023516952,"about_ca_topic_score_gemma":0.0042009032,"teacher_disagreement_score":0.0032108678,"about_ca_system_score_codex":0.0008253999,"about_ca_system_score_gemma":0.0012777336,"threshold_uncertainty_score":0.008922458},"labels":[],"label_agreement":null},{"id":"W7093512523","doi":"","title":"Solar, Wind Projects Could Fail Under New Alberta Grid Regulations","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Grid; Power grid; Wind power; Government (linguistics)","score_opus":0.011458897421276537,"score_gpt":0.2156415007981875,"score_spread":0.20418260337691096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7093512523","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012807775,0.00040572826,0.001683711,0.009944924,0.0008964039,0.00012508893,0.005273832,0.00066667644,0.9681958],"genre_scores_gemma":[0.0305891,0.00024484683,0.0010432308,0.0018970534,0.000077148514,0.000035285542,0.001811833,0.00012408436,0.9641773],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988612,0.000057905538,0.000013686803,0.000037523892,0.00069539645,0.00033436363],"domain_scores_gemma":[0.99880743,0.000097019365,0.000036538037,0.000076475015,0.00075871166,0.00022382176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013043726,0.00069013983,0.00024409941,0.0006647134,0.0028956928,0.0028736605,0.0012034441,0.002766122,0.049321845],"category_scores_gemma":[0.0020858452,0.00035765872,0.0004066227,0.0006343984,0.0006135046,0.00066866894,0.0009324676,0.0017843788,0.007262788],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001645358,0.00009492554,0.0033313024,0.00004808822,0.000013372935,0.0002914514,0.000102753176,0.0050360495,0.0010232297,0.038238145,0.9032706,0.048385486],"study_design_scores_gemma":[0.00006406271,0.000046971214,0.015477554,0.00005355172,0.00001575573,0.00007564661,0.0004161078,0.0046770493,0.001200932,0.0076050423,0.9703331,0.000034261793],"about_ca_topic_score_codex":0.7758177,"about_ca_topic_score_gemma":0.9475675,"teacher_disagreement_score":0.22418231,"about_ca_system_score_codex":0.010784282,"about_ca_system_score_gemma":0.030354125,"threshold_uncertainty_score":0.4510051},"labels":[],"label_agreement":null},{"id":"W7094195873","doi":"","title":"New Electricity: Generation, Pricing, Wheeling &amp; Regulation","year":2002,"lang":"","type":"article","venue":"Case Western Reserve University School of Law Scholarly Commons (Case Western Reserve University)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wheeling; Work (physics); State (computer science); Production (economics); Process (computing)","score_opus":0.04522757773995177,"score_gpt":0.2231383862056575,"score_spread":0.17791080846570573,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7094195873","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009450302,0.025330711,0.030483644,0.029896174,0.0026538756,0.00006334264,0.0012396371,0.00033802318,0.9005443],"genre_scores_gemma":[0.3584811,0.02290791,0.008148111,0.0024465395,0.0020014686,0.00012557948,0.00047851124,0.00018143922,0.6052294],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99950814,0.00009836808,0.0000149624875,0.0000633651,0.00027484886,0.0000402284],"domain_scores_gemma":[0.9997085,0.00008067229,0.0000393375,0.000026625818,0.00011088316,0.000034000128],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000379309,0.0004605339,0.00026215432,0.0012215333,0.0011020624,0.0060424767,0.0005234363,0.0026383896,0.021504603],"category_scores_gemma":[0.0017001639,0.00032155393,0.00021819003,0.002708619,0.0019421255,0.0046727387,0.00072509836,0.0018172761,0.002128654],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012228104,0.00002625251,0.00037750063,0.000038629307,0.000004816179,0.000060867722,0.000110579065,0.0029866917,0.00012881594,0.8533652,0.10028783,0.042600647],"study_design_scores_gemma":[0.00001030937,0.000020749196,0.001993045,0.000091670576,0.000015438327,0.00021579239,0.0003263264,0.00680038,0.0003907011,0.30533686,0.6847697,0.00002902825],"about_ca_topic_score_codex":0.08436792,"about_ca_topic_score_gemma":0.12137275,"teacher_disagreement_score":0.08436792,"about_ca_system_score_codex":0.006032027,"about_ca_system_score_gemma":0.0027752458,"threshold_uncertainty_score":0.1677537},"labels":[],"label_agreement":null},{"id":"W7095271146","doi":"","title":"Prepared by:","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"","score_opus":0.0025051300306861857,"score_gpt":0.1625987751698978,"score_spread":0.1600936451392116,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7095271146","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005349454,0.0013341171,0.0026277103,0.025491495,0.013706277,0.00052343245,0.013501284,0.001487678,0.9359786],"genre_scores_gemma":[0.008020062,0.00042253727,0.0006937823,0.0006333285,0.0003550441,0.00003388475,0.0015130573,0.00024539733,0.9880828],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994541,0.000030428238,0.000019436591,0.00008587121,0.0003224966,0.00008770669],"domain_scores_gemma":[0.9985726,0.000068262656,0.000036841837,0.000090613925,0.0009799631,0.00025181388],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0005996993,0.00041778924,0.00044090458,0.00085000135,0.0016778741,0.0032485207,0.00069248,0.0014436686,0.66265714],"category_scores_gemma":[0.002511086,0.00024365484,0.00044775655,0.00077355886,0.00057411136,0.0008159011,0.001605022,0.0010198428,0.34824568],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005627678,0.000010538587,0.0004989331,0.00008691698,0.000003534758,0.00011068939,0.000102320395,0.00012529946,0.0006816921,0.0026620233,0.966447,0.02921477],"study_design_scores_gemma":[0.000009382214,0.000010256776,0.000750303,0.000040285133,0.0000024617648,0.00003564575,0.000100849255,0.000111624424,0.00026037972,0.00035654398,0.998317,0.0000053025587],"about_ca_topic_score_codex":0.05610745,"about_ca_topic_score_gemma":0.17444637,"teacher_disagreement_score":0.33734286,"about_ca_system_score_codex":0.0034391643,"about_ca_system_score_gemma":0.0062702177,"threshold_uncertainty_score":0.48117864},"labels":[],"label_agreement":null},{"id":"W7095309776","doi":"","title":"Pricing Electricity Calls 1","year":2000,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Power (physics); Electricity pricing; Mains electricity; Electricity market","score_opus":0.00313736938002258,"score_gpt":0.16950408907994174,"score_spread":0.16636671969991917,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7095309776","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06356391,0.008170861,0.07457671,0.014441784,0.001602734,0.00022959778,0.010039763,0.0010210336,0.82635355],"genre_scores_gemma":[0.8140146,0.004698613,0.009545781,0.0005942511,0.0005665321,0.00006203418,0.00447895,0.00018984267,0.16584942],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99875903,0.00032414426,0.00002856328,0.000151645,0.0005193853,0.00021723716],"domain_scores_gemma":[0.9982591,0.0007757521,0.00008814444,0.00019486112,0.00051503157,0.00016708732],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011226176,0.00056732947,0.0007466054,0.00072264357,0.0009850707,0.005262457,0.0016655148,0.0021381238,0.0483561],"category_scores_gemma":[0.007135461,0.00045909494,0.00035587157,0.0027905644,0.00082706386,0.002911547,0.0004997715,0.0023797362,0.0040717754],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022634125,0.00008988948,0.007784819,0.000180508,0.00004679153,0.00022294566,0.00018534173,0.059374638,0.0008290687,0.5872305,0.20862277,0.13520643],"study_design_scores_gemma":[0.0001389481,0.00016221721,0.019716289,0.00023268099,0.00011100287,0.00041561044,0.0009574682,0.2607,0.001670297,0.31140885,0.40433013,0.00015656376],"about_ca_topic_score_codex":0.13562347,"about_ca_topic_score_gemma":0.22779173,"teacher_disagreement_score":0.13562347,"about_ca_system_score_codex":0.0058339923,"about_ca_system_score_gemma":0.004191091,"threshold_uncertainty_score":0.2696681},"labels":[],"label_agreement":null},{"id":"W7095903816","doi":"","title":"We are pleased to submit the enclosed report The Relationship between Competitive","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Restructuring; Task force; Task (project management); Electric power industry; Power (physics)","score_opus":0.018349787801046784,"score_gpt":0.22113338354961132,"score_spread":0.20278359574856453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7095903816","genre_codex":"editorial","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015123704,0.0065645906,0.0055097896,0.4057272,0.502738,0.00041926024,0.0051666326,0.0013158588,0.07104625],"genre_scores_gemma":[0.01797314,0.008977745,0.005120416,0.08484892,0.121281296,0.00029385448,0.004664809,0.0022877194,0.75455207],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9958941,0.00040606456,0.00022152849,0.0002535742,0.002788476,0.00043625315],"domain_scores_gemma":[0.95762235,0.0038022294,0.0015736021,0.0011554263,0.033971045,0.0018753345],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0031942772,0.0006187644,0.00067260436,0.0017482335,0.0026999125,0.0049273386,0.0012607889,0.004399123,0.092364274],"category_scores_gemma":[0.037323702,0.00031924408,0.0007425213,0.0016125566,0.0008667896,0.0028665303,0.0013324751,0.004635215,0.059059184],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005517069,0.00000581306,0.00017536161,0.000024266772,0.0000020691714,0.00003111449,0.000017951497,0.00003210903,0.000061404215,0.0006673675,0.9926963,0.0062807165],"study_design_scores_gemma":[0.000004216747,0.00001623477,0.0005598502,0.00006838027,0.000006054653,0.000047990507,0.00014181389,0.000103500264,0.00026420772,0.00084166066,0.99793017,0.000015972026],"about_ca_topic_score_codex":0.025630789,"about_ca_topic_score_gemma":0.03456139,"teacher_disagreement_score":0.90763575,"about_ca_system_score_codex":0.0032137106,"about_ca_system_score_gemma":0.006775172,"threshold_uncertainty_score":0.3089893},"labels":[],"label_agreement":null},{"id":"W7096206764","doi":"","title":"Public Centralized Forecasting Registration and Communication Requirements for Distribution Connected Variable Generators","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Variable (mathematics); Subject matter; Electricity; Subject (documents); Distribution (mathematics); Subject-matter expert","score_opus":0.06753485790806127,"score_gpt":0.23439775823775982,"score_spread":0.16686290032969855,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096206764","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016016638,0.00026569937,0.23857638,0.004185982,0.0006080936,0.0046098023,0.032531366,0.031584345,0.6716217],"genre_scores_gemma":[0.14421915,0.0008999888,0.12158962,0.0013517727,0.00035202556,0.0054661008,0.053063978,0.0056247595,0.6674327],"study_design_codex":"not_applicable","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99579054,0.0007920918,0.00033270437,0.0002982519,0.002224192,0.0005621882],"domain_scores_gemma":[0.9862765,0.0029873953,0.00071792764,0.0026599981,0.006976167,0.00038197907],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0042990777,0.0005623349,0.0007728029,0.0014809408,0.0019322645,0.0019858445,0.0022096017,0.0015983895,0.20246947],"category_scores_gemma":[0.012130439,0.0008520757,0.0003495299,0.0017267352,0.0004979586,0.0022788274,0.0011440477,0.0009915021,0.13721374],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018261874,0.00019542195,0.0018880647,0.00021347545,0.0000049660757,0.00022296485,0.0006214822,0.012158368,0.0061242376,0.020119017,0.7058289,0.25244042],"study_design_scores_gemma":[0.00010335181,0.00010561322,0.0049862587,0.00018465245,0.000011076219,0.00023119956,0.00047084535,0.019479701,0.0044367313,0.0043853954,0.96553135,0.00007369398],"about_ca_topic_score_codex":0.06433735,"about_ca_topic_score_gemma":0.09896916,"teacher_disagreement_score":0.20246947,"about_ca_system_score_codex":0.0034083724,"about_ca_system_score_gemma":0.009506525,"threshold_uncertainty_score":0.6773279},"labels":[],"label_agreement":null},{"id":"W7096273899","doi":"","title":"Modelling Electricity Price Risk1","year":2003,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity price; Power (physics); Mains electricity","score_opus":0.00818078894025679,"score_gpt":0.17865527047050694,"score_spread":0.17047448153025016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096273899","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3561742,0.0043942155,0.5159087,0.009513761,0.0006425024,0.00014072402,0.004423102,0.0007041611,0.108098574],"genre_scores_gemma":[0.949498,0.0010294556,0.011936644,0.00013008864,0.0001368456,0.000059161463,0.000841777,0.00012719943,0.036240686],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995946,0.00016802497,0.000016976282,0.00007688549,0.00006739083,0.00007609556],"domain_scores_gemma":[0.9979691,0.0014317081,0.00022363047,0.0000797484,0.00016926198,0.0001265262],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009273169,0.0008731093,0.0008904673,0.0005418853,0.0003645852,0.0023434276,0.0012375254,0.002319921,0.009542267],"category_scores_gemma":[0.0063365977,0.00066488405,0.0007241864,0.0008985423,0.0006804882,0.0022188153,0.0008752788,0.0019610305,0.0008387104],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030507414,0.000019652896,0.0011325955,0.00002037621,0.00002704073,0.000105664476,0.00002416557,0.94140345,0.00013015111,0.051384944,0.0021420629,0.003579339],"study_design_scores_gemma":[0.000007910303,0.000008120078,0.00019302094,0.000005026877,0.0000058545825,0.000015720778,0.000011816593,0.9731925,0.00003529778,0.02560241,0.0009170182,0.0000053303834],"about_ca_topic_score_codex":0.020628285,"about_ca_topic_score_gemma":0.012930395,"teacher_disagreement_score":0.020628285,"about_ca_system_score_codex":0.0016479425,"about_ca_system_score_gemma":0.0011286895,"threshold_uncertainty_score":0.0410164},"labels":[],"label_agreement":null},{"id":"W7096327339","doi":"","title":"Offer Behaviour Enforcement Guidelines For Alberta’s Wholesale Electricity Market","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transparency (behavior); Enforcement; Context (archaeology); Electricity; Process (computing); Electricity market; Set (abstract data type)","score_opus":0.049670886230131606,"score_gpt":0.2552350295589628,"score_spread":0.20556414332883122,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096327339","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04445514,0.0033698047,0.110972255,0.08165819,0.0026880288,0.0074309222,0.0042537875,0.005114183,0.7400577],"genre_scores_gemma":[0.29204094,0.0043225014,0.26598567,0.03112681,0.00083397806,0.005520881,0.005244682,0.00095313205,0.3939714],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.95141274,0.0077139717,0.0046296013,0.0017839011,0.030961012,0.0034988231],"domain_scores_gemma":[0.9445081,0.014770299,0.0030168747,0.0043218234,0.031996246,0.0013867535],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.029465225,0.0008007143,0.000649385,0.003522235,0.0071737226,0.011285706,0.005854305,0.010445791,0.0056544095],"category_scores_gemma":[0.04088134,0.0012784165,0.0009501549,0.002448698,0.005839053,0.002913954,0.00313435,0.0075249085,0.002502393],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000085877036,0.00068351964,0.00832206,0.00072665076,0.000029561897,0.0017500465,0.020883141,0.00858835,0.007132188,0.44261318,0.39763317,0.111552246],"study_design_scores_gemma":[0.000067711764,0.00010526403,0.016746826,0.0012711266,0.000048481867,0.00049724325,0.0059123165,0.0052690473,0.0036684023,0.030387156,0.93568087,0.0003456864],"about_ca_topic_score_codex":0.5871967,"about_ca_topic_score_gemma":0.7249943,"teacher_disagreement_score":0.4128033,"about_ca_system_score_codex":0.028743478,"about_ca_system_score_gemma":0.086919785,"threshold_uncertainty_score":0.8304688},"labels":[],"label_agreement":null},{"id":"W7096563607","doi":"","title":"Prepared for the Independent Power Producers Society of Alberta (IPPSA),","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Government (linguistics); Production (economics); Work (physics)","score_opus":0.014920559841503494,"score_gpt":0.19823151030116962,"score_spread":0.1833109504596661,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096563607","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007860897,0.0078044143,0.010651434,0.02424777,0.24082197,0.0010639033,0.023010392,0.0017484934,0.6827908],"genre_scores_gemma":[0.0078040157,0.0014097429,0.0026128779,0.0005341554,0.0038370057,0.00006205557,0.0024683615,0.0001983927,0.9810734],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99968946,0.000024330218,0.000018192017,0.000040133833,0.0001889515,0.000038820257],"domain_scores_gemma":[0.99802065,0.00011808541,0.00004062924,0.0001335649,0.0015494238,0.00013775453],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0005954998,0.00070537033,0.0005916195,0.0012904401,0.00089831237,0.0015846677,0.0008358601,0.00086763164,0.26085332],"category_scores_gemma":[0.0027927135,0.0002824097,0.0003670258,0.001098338,0.00034140682,0.00074431155,0.0006753072,0.0013770007,0.06366259],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000825878,0.00001867753,0.0001406709,0.000049300805,0.0000052044097,0.00007433054,0.000026196498,0.0007489352,0.00055151497,0.0017896193,0.970369,0.026144043],"study_design_scores_gemma":[0.00002111937,0.000036552854,0.0023827036,0.00007020568,0.000008634191,0.00007088856,0.000115502924,0.001039069,0.0005277184,0.0014959724,0.99422026,0.0000112960215],"about_ca_topic_score_codex":0.06441328,"about_ca_topic_score_gemma":0.1328724,"teacher_disagreement_score":0.9355867,"about_ca_system_score_codex":0.0017184812,"about_ca_system_score_gemma":0.0031549823,"threshold_uncertainty_score":0.8726413},"labels":[],"label_agreement":null},{"id":"W7096567348","doi":"","title":"Hydro One Toronto Hydro","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydroelectricity; Value (mathematics); Market value; Generator (circuit theory)","score_opus":0.003721416879748225,"score_gpt":0.16981641977545878,"score_spread":0.16609500289571055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096567348","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0039057126,0.0024609363,0.0026977384,0.04180538,0.01941475,0.0003143104,0.0073074694,0.0015866068,0.92050713],"genre_scores_gemma":[0.0049316175,0.00036434716,0.0002869369,0.0013390277,0.00031984915,0.0000214406,0.00061758875,0.00020399097,0.9919151],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99924636,0.00008082948,0.00002944878,0.00013713376,0.0004071502,0.0000991749],"domain_scores_gemma":[0.99708873,0.00024066585,0.00006531039,0.00024309113,0.0015119278,0.0008503066],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0009776363,0.0005168828,0.00046749602,0.00062070705,0.0016542264,0.0019304842,0.0008677867,0.0016364814,0.711228],"category_scores_gemma":[0.0027725776,0.00033087243,0.00024741917,0.0006905829,0.00040409705,0.0012355879,0.0013477696,0.0013984725,0.3109933],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000083326806,0.000007148084,0.00021611516,0.00007795831,0.000002028176,0.00020553487,0.000061992825,0.0000765029,0.00043654005,0.0016503328,0.96856064,0.02862179],"study_design_scores_gemma":[0.0000046909727,0.0000056726835,0.00023248124,0.000015797359,0.0000011052787,0.00003484089,0.00006993659,0.00005355315,0.00008415208,0.00010506549,0.99939,0.0000027407905],"about_ca_topic_score_codex":0.01587733,"about_ca_topic_score_gemma":0.05071136,"teacher_disagreement_score":0.288772,"about_ca_system_score_codex":0.0028826348,"about_ca_system_score_gemma":0.004073311,"threshold_uncertainty_score":0.4118982},"labels":[],"label_agreement":null},{"id":"W7096762993","doi":"","title":"Description","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Legislation; Legislature; Government (linguistics); Anticipation (artificial intelligence); Electricity; Electricity market","score_opus":0.023605808202282603,"score_gpt":0.15486581773528757,"score_spread":0.13126000953300496,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096762993","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0027680811,0.0012939977,0.011355352,0.0041649733,0.0017726112,0.0016461018,0.08202844,0.0040890416,0.8908814],"genre_scores_gemma":[0.014646987,0.0015812599,0.0083183395,0.0027009335,0.00028733377,0.0011930462,0.07798672,0.0015539866,0.89173126],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99837697,0.00013936801,0.000109369306,0.00029799997,0.0008118859,0.00026432725],"domain_scores_gemma":[0.9968694,0.00025156472,0.00010994274,0.0005424752,0.0018743628,0.00035222163],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0019750877,0.00091970357,0.0008105136,0.0018186866,0.003380718,0.0044157067,0.0030618238,0.001812971,0.5879659],"category_scores_gemma":[0.005346288,0.00046782926,0.00077498803,0.002699824,0.00077999354,0.002704171,0.0027314487,0.0012021398,0.42302313],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017957338,0.000045844274,0.0010909978,0.00036115656,0.000006627884,0.00015345844,0.00039175738,0.00018810012,0.0008054647,0.016157715,0.89760125,0.083018035],"study_design_scores_gemma":[0.0000060448524,0.000011410429,0.00044470344,0.000043111526,0.0000023819362,0.000046199413,0.000109062756,0.00004951697,0.00013287862,0.0007585372,0.9983902,0.0000060619227],"about_ca_topic_score_codex":0.10869651,"about_ca_topic_score_gemma":0.11598267,"teacher_disagreement_score":0.4120341,"about_ca_system_score_codex":0.006246703,"about_ca_system_score_gemma":0.009310034,"threshold_uncertainty_score":0.5877166},"labels":[],"label_agreement":null},{"id":"W7096776496","doi":"","title":"Stakeholder Advisory Committee Terms of Reference Discussion Paper","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Stakeholder; Section (typography); Process (computing); Advisory committee; Stakeholder analysis; Stakeholder engagement; Plan (archaeology)","score_opus":0.027843127277149684,"score_gpt":0.2180728208530005,"score_spread":0.19022969357585082,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096776496","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015053428,0.0030564659,0.025698865,0.3311975,0.07856993,0.022470988,0.008337354,0.0012272518,0.5279363],"genre_scores_gemma":[0.029217383,0.0031750272,0.036450658,0.24248941,0.020085558,0.038942635,0.006846828,0.0019000076,0.6208925],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.8427222,0.06617813,0.013979853,0.010822075,0.05380203,0.012495819],"domain_scores_gemma":[0.737185,0.06443069,0.007104317,0.018404935,0.15753359,0.015341463],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.15269941,0.001739386,0.0018424795,0.0051506483,0.011875829,0.02988941,0.008022567,0.034167945,0.13976799],"category_scores_gemma":[0.2777196,0.0015337828,0.0022124683,0.0052871187,0.005444186,0.011640896,0.009844709,0.021493882,0.08450986],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046016794,0.00004572636,0.00010404845,0.0003577667,0.0000070908377,0.000093972696,0.0013505779,0.000102552236,0.0003420118,0.0511352,0.9258659,0.020549057],"study_design_scores_gemma":[0.00001219738,0.000010907884,0.00010801792,0.00046409838,0.0000031720326,0.000009349531,0.00070741994,0.000054275828,0.000112347014,0.0038677505,0.9946326,0.000017910084],"about_ca_topic_score_codex":0.015265752,"about_ca_topic_score_gemma":0.014662359,"teacher_disagreement_score":0.15269941,"about_ca_system_score_codex":0.026068432,"about_ca_system_score_gemma":0.09019814,"threshold_uncertainty_score":0.80756134},"labels":[],"label_agreement":null},{"id":"W7096902185","doi":"","title":"Network Methods for Head-dependent Hydro Power Scheduling","year":2007,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bounding overwatch; Electricity; Hydroelectricity; Nonlinear system; Power (physics); Electricity generation; Scheduling (production processes); Hydro power; Power flow","score_opus":0.015816773267626264,"score_gpt":0.3098507796414498,"score_spread":0.29403400637382354,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096902185","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0027982823,0.0009367398,0.9890771,0.0003088822,0.000108496526,0.000054521828,0.00017622417,0.00016385067,0.006375893],"genre_scores_gemma":[0.3594881,0.0029631872,0.59796816,0.00042487693,0.00046506638,0.0008691717,0.0009931466,0.0007092481,0.03611907],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996061,0.0001978063,0.000013747366,0.00006521647,0.00007907035,0.000038066446],"domain_scores_gemma":[0.9983267,0.0011709733,0.00017727118,0.000069195994,0.00019457031,0.000061260005],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011762903,0.0011359726,0.00078521157,0.0010803354,0.0006196904,0.0009911748,0.001193181,0.0011230508,0.009727061],"category_scores_gemma":[0.0043371897,0.00054968137,0.0006683325,0.0011880306,0.0006966079,0.0014387469,0.0013271265,0.0013934684,0.0014865962],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032056538,0.000019891075,0.00027499377,0.00007598184,0.000028970697,0.000034837554,0.00003059539,0.93226683,0.00022064804,0.04248492,0.0019712807,0.022558978],"study_design_scores_gemma":[0.000005384164,0.000004114308,0.000024301924,0.000007850299,0.0000024722024,0.000005177466,0.000006191606,0.97684926,0.000039212995,0.021584744,0.001469055,0.0000022312283],"about_ca_topic_score_codex":0.009384359,"about_ca_topic_score_gemma":0.008817254,"teacher_disagreement_score":0.009727061,"about_ca_system_score_codex":0.0015600913,"about_ca_system_score_gemma":0.0011212769,"threshold_uncertainty_score":0.03254026},"labels":[],"label_agreement":null},{"id":"W7096904462","doi":"","title":"Occupational exposures and non-Hodgkin&amp;apos;s lymphoma: Canadian case-control study","year":2008,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Attribution; License; Clothing; Data collection; Occupational exposure","score_opus":0.028171595612993094,"score_gpt":0.2501562704813216,"score_spread":0.2219846748683285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096904462","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99349976,0.0010281721,0.0002624724,0.000285325,0.000030499803,0.00013456758,0.002602599,0.000018503426,0.0021380382],"genre_scores_gemma":[0.9942326,0.0011877052,0.0004367182,0.00016805784,0.000026049285,0.000067838984,0.0015192458,0.000012988008,0.0023488],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9982874,0.00017339269,0.000116713265,0.00035290196,0.00051419355,0.0005553326],"domain_scores_gemma":[0.99673414,0.00033156475,0.0005375528,0.00025758633,0.0012512561,0.0008878406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013827177,0.0012287251,0.0009952034,0.003176464,0.0065063927,0.0018558706,0.0026158378,0.0016217165,0.0063496404],"category_scores_gemma":[0.0030639952,0.0016035166,0.0014970376,0.007347221,0.0018422524,0.00075664045,0.0010320221,0.001893835,0.00057936815],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006138638,0.00038275676,0.99087125,0.000088828645,0.0003548886,0.0006915294,0.0010746202,0.000110800866,0.00050263386,0.00033203306,0.0018642293,0.0031125725],"study_design_scores_gemma":[0.00017382619,0.00016400298,0.9959474,0.000039375656,0.00022193497,0.00052615436,0.0009179722,0.0002738253,0.00007515216,0.000057394493,0.0015686773,0.000034317247],"about_ca_topic_score_codex":0.98634714,"about_ca_topic_score_gemma":0.98757255,"teacher_disagreement_score":0.021297965,"about_ca_system_score_codex":0.021297965,"about_ca_system_score_gemma":0.022744833,"threshold_uncertainty_score":0.15452826},"labels":[],"label_agreement":null},{"id":"W7096917445","doi":"","title":"18-Month Outlook Executive Summary","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Executive summary; Mains electricity; Service (business); Electricity market; Reliability (semiconductor); Demand forecasting","score_opus":0.011558824889582767,"score_gpt":0.18510863137161415,"score_spread":0.1735498064820314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096917445","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002358898,0.006965598,0.0011427376,0.0053688497,0.01015855,0.00074476714,0.07399782,0.0014073176,0.8978554],"genre_scores_gemma":[0.0061443965,0.006830038,0.0006205683,0.0005754459,0.0018184362,0.00022250167,0.04146573,0.00026780018,0.9420551],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99942553,0.000021300963,0.00002273068,0.000051356204,0.0004036428,0.00007538628],"domain_scores_gemma":[0.9984182,0.000019550042,0.00005954553,0.000058807986,0.001292513,0.00015131997],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060981186,0.00091700326,0.0005118233,0.001492927,0.00082437607,0.002416721,0.00085237494,0.0008835664,0.2354459],"category_scores_gemma":[0.0012542802,0.0002697465,0.00028277555,0.0021950202,0.00015194202,0.0010893232,0.0006098386,0.00083233323,0.17546423],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039136114,0.000013970789,0.0002548245,0.00014949976,0.0000024333501,0.00003893642,0.000015674947,0.00010004733,0.0002480144,0.0005754587,0.95681953,0.041742474],"study_design_scores_gemma":[0.000004587761,0.000010151085,0.001465676,0.00003378175,0.0000013239277,0.000009414642,0.000010894825,0.000031490934,0.000039401417,0.00005082154,0.9983398,0.0000025977595],"about_ca_topic_score_codex":0.12511435,"about_ca_topic_score_gemma":0.16039588,"teacher_disagreement_score":0.2354459,"about_ca_system_score_codex":0.002596259,"about_ca_system_score_gemma":0.0045390828,"threshold_uncertainty_score":0.787645},"labels":[],"label_agreement":null},{"id":"W7097501063","doi":"","title":"Western Interconnection","year":2013,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Interconnection; Work (physics); Key (lock); Electric utility","score_opus":0.00312021321208994,"score_gpt":0.15725748129223,"score_spread":0.15413726808014006,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097501063","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026530575,0.00081594946,0.011465939,0.005014358,0.0021188494,0.00012353018,0.008564956,0.0018411499,0.94352466],"genre_scores_gemma":[0.034653533,0.00050935085,0.0030188619,0.00023382426,0.00008566907,0.00002997406,0.0021730892,0.000286529,0.95900923],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999796,0.000023548186,0.0000074187597,0.00006616886,0.000084912026,0.000022047212],"domain_scores_gemma":[0.99965096,0.000026546828,0.00002229191,0.00003900282,0.00023521733,0.000025953794],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00024742977,0.0004197049,0.00013873637,0.0005457207,0.0011175477,0.00084906403,0.00035127817,0.00025875456,0.1620731],"category_scores_gemma":[0.0006946272,0.0001652932,0.00010548488,0.0012065374,0.00012662711,0.0007488746,0.0004010304,0.00064126693,0.03712311],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000116890275,0.000062577354,0.004287839,0.000102137434,0.000018053724,0.0005023642,0.0004679956,0.0021347844,0.0029947618,0.029066563,0.7827686,0.17747743],"study_design_scores_gemma":[0.000008819474,0.000020628067,0.0032837822,0.000024044246,0.000008139243,0.0000981848,0.0002753283,0.0011979161,0.0015780954,0.0014973865,0.992,0.0000076124093],"about_ca_topic_score_codex":0.024583103,"about_ca_topic_score_gemma":0.09388816,"teacher_disagreement_score":0.83792686,"about_ca_system_score_codex":0.0012394459,"about_ca_system_score_gemma":0.001300735,"threshold_uncertainty_score":0.5421885},"labels":[],"label_agreement":null},{"id":"W7097522794","doi":"","title":"40 | Fourth Quarter 2013 Politics of Power in China: Institutional Bottlenecks to Reducing Wind Curtailment Through Improved Transmission","year":2015,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; China; Renewable energy; Quarter (Canadian coin); Electricity; Nameplate capacity; Power grid","score_opus":0.009194655371121565,"score_gpt":0.22265542194746266,"score_spread":0.21346076657634108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097522794","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06389185,0.076719776,0.0316778,0.088804565,0.004588003,0.0002822515,0.0010388752,0.00066549896,0.73233145],"genre_scores_gemma":[0.6669622,0.07480885,0.011792953,0.005169937,0.0022924354,0.00016006273,0.00090782694,0.0002529508,0.23765269],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.999574,0.000109137516,0.000019225798,0.00004682889,0.00017190042,0.00007893898],"domain_scores_gemma":[0.9997695,0.00003119587,0.000026980735,0.000028552613,0.00009400763,0.00004973404],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011014065,0.00041088794,0.00022966256,0.0006092187,0.0012051212,0.0037652669,0.0006920739,0.00081585173,0.019487767],"category_scores_gemma":[0.0009805154,0.00016126139,0.000310445,0.0011956175,0.0010729388,0.0014983418,0.00072557596,0.0008168626,0.001761365],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011266504,0.00008825648,0.008768813,0.00072373176,0.000056410398,0.0004879234,0.0005536157,0.018210515,0.0014346682,0.28410155,0.32305852,0.3624033],"study_design_scores_gemma":[0.000043040167,0.00012269974,0.019234858,0.0007962056,0.000040608436,0.0001210858,0.00095117587,0.027953943,0.001206666,0.05734457,0.892133,0.00005210051],"about_ca_topic_score_codex":0.043219917,"about_ca_topic_score_gemma":0.06874105,"teacher_disagreement_score":0.043219917,"about_ca_system_score_codex":0.004707139,"about_ca_system_score_gemma":0.006466831,"threshold_uncertainty_score":0.085936725},"labels":[],"label_agreement":null},{"id":"W7097704016","doi":"","title":"THE UNIVERSITY OF CALGARY Stochastic Models for Natural Gas and Electricity Prices","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Natural gas; Spot contract; Electricity price; Stochastic modelling; Volatility (finance); Natural gas prices; Electricity generation","score_opus":0.0033319072758991033,"score_gpt":0.15464381924709253,"score_spread":0.15131191197119342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097704016","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07504382,0.024382612,0.565795,0.036754526,0.0034898925,0.00021818372,0.006901393,0.0009499091,0.28646463],"genre_scores_gemma":[0.6430869,0.01962282,0.08416146,0.0012161579,0.0011956064,0.00040929255,0.00412789,0.00043492496,0.24574493],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999622,0.00010240056,0.0000135374175,0.000075487515,0.0001229408,0.00006349657],"domain_scores_gemma":[0.99932957,0.0003159766,0.000073565156,0.000078385085,0.00014934136,0.000053120417],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006443365,0.0009066107,0.00097175344,0.00075515447,0.00061122555,0.0023481,0.0013275248,0.0015033674,0.013703354],"category_scores_gemma":[0.0031973366,0.00042466028,0.0007483313,0.0017206578,0.00083265366,0.0013311127,0.001156981,0.0025956738,0.0023493862],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051160703,0.00003954441,0.0020206114,0.0001042088,0.000054174187,0.00018785725,0.00010785409,0.4551072,0.00046328828,0.46185043,0.045495912,0.03451775],"study_design_scores_gemma":[0.000035698497,0.000024232428,0.002040432,0.000100992234,0.000020675114,0.000063712745,0.00006884209,0.66785175,0.00030393462,0.23949711,0.089951254,0.000041355215],"about_ca_topic_score_codex":0.097568214,"about_ca_topic_score_gemma":0.07385176,"teacher_disagreement_score":0.097568214,"about_ca_system_score_codex":0.0049211886,"about_ca_system_score_gemma":0.0030378886,"threshold_uncertainty_score":0.1940006},"labels":[],"label_agreement":null},{"id":"W7097942486","doi":"","title":"Public Market Entry: A Step-by-Step Guide","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Subject matter; Order (exchange); Subject (documents); Market research; Electricity; Market analysis","score_opus":0.016329024815464735,"score_gpt":0.18310566436881806,"score_spread":0.1667766395533533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097942486","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003212998,0.0015916219,0.095686756,0.013679432,0.0014279179,0.012512683,0.0554011,0.025499184,0.79098827],"genre_scores_gemma":[0.0069702407,0.0036849247,0.09802093,0.0028955126,0.0003506258,0.004584288,0.021872189,0.0038955857,0.8577257],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99701583,0.00028100552,0.00023968882,0.0002516005,0.0018619457,0.0003499297],"domain_scores_gemma":[0.9925368,0.0014478707,0.0003756623,0.00075676065,0.0041255536,0.00075734727],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003838656,0.0012271742,0.0010754152,0.0040667295,0.0024994868,0.006064114,0.002798439,0.0025227186,0.27461395],"category_scores_gemma":[0.011202158,0.0021354652,0.0007443708,0.003905495,0.0010201256,0.0062202164,0.0032753944,0.0026086706,0.28363103],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020232095,0.00010325324,0.00033547016,0.00013776324,0.0000019730924,0.000099560326,0.00020253922,0.0004009145,0.0003868946,0.0053377654,0.8892367,0.10373688],"study_design_scores_gemma":[0.0000134796755,0.000020857888,0.0008134497,0.00011397022,0.0000012643186,0.00006822842,0.00014757988,0.0003277855,0.00020359537,0.0015010436,0.996766,0.00002270377],"about_ca_topic_score_codex":0.077236205,"about_ca_topic_score_gemma":0.16319552,"teacher_disagreement_score":0.27461395,"about_ca_system_score_codex":0.00435491,"about_ca_system_score_gemma":0.0197353,"threshold_uncertainty_score":0.9186752},"labels":[],"label_agreement":null},{"id":"W7098013587","doi":"","title":"Integrating the Energy Markets in North-America: Conditions Helping Large-scale Integration of Wind Power? By","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Electric power system; Intermittency; Revenue; Power (physics); Resource (disambiguation); Electricity generation; Order (exchange); Base load power plant","score_opus":0.006137618733553719,"score_gpt":0.18894366910278446,"score_spread":0.18280605036923073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7098013587","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9635274,0.00035058978,0.008742006,0.0015928727,0.0000339542,0.00007463505,0.00027199948,0.00009654035,0.025310008],"genre_scores_gemma":[0.99734575,0.000097792916,0.0014835554,0.000071563685,0.000007141073,0.000018473615,0.00006492773,0.000008265285,0.00090265257],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9997763,0.00006790678,0.0000060636453,0.0000384437,0.000032275366,0.00007898252],"domain_scores_gemma":[0.99959403,0.00014353219,0.00011814115,0.000016145941,0.00007103306,0.000057174457],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005039715,0.00031540293,0.00035062592,0.00035835296,0.00072574714,0.0026065835,0.0005417399,0.0008667066,0.0030595164],"category_scores_gemma":[0.0023363337,0.000357559,0.00029499142,0.0006165948,0.0008947201,0.0012890863,0.00071816595,0.00061855506,0.00011966452],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015393163,0.00037927047,0.05543593,0.000061614446,0.00010151164,0.0012790893,0.00041808613,0.89527017,0.0030323716,0.01994734,0.0042894613,0.019631207],"study_design_scores_gemma":[0.00012775863,0.00009906176,0.03563096,0.000031528347,0.000061369916,0.00017340592,0.0017176685,0.945374,0.0009839281,0.011734307,0.0040352647,0.00003083926],"about_ca_topic_score_codex":0.25122544,"about_ca_topic_score_gemma":0.36727488,"teacher_disagreement_score":0.25122544,"about_ca_system_score_codex":0.002436357,"about_ca_system_score_gemma":0.0021256872,"threshold_uncertainty_score":0.49952632},"labels":[],"label_agreement":null},{"id":"W7099421477","doi":"","title":"Background The existing definition of MPWG Issue #7 (Imports and Exports Setting the Ontario Market","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Allocative efficiency; Marginal cost; Production (economics); Market power; Investment (military); Market price; Competition (biology); Price mechanism; Perfect competition; Factor price","score_opus":0.0162005096544819,"score_gpt":0.2103027623627858,"score_spread":0.1941022527083039,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7099421477","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01011328,0.0058192248,0.009886645,0.041076023,0.0018995876,0.0006507617,0.003512867,0.00013826023,0.92690325],"genre_scores_gemma":[0.15732759,0.009448891,0.014929819,0.017712269,0.0018239076,0.00076723204,0.0043005464,0.00032317374,0.79336655],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.994048,0.00046246056,0.00035355767,0.0007882324,0.003292412,0.0010553551],"domain_scores_gemma":[0.9951683,0.0006863007,0.0005690411,0.00028656182,0.002744441,0.000545278],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0025186709,0.00088736136,0.00047963086,0.002171473,0.0074579604,0.011071246,0.002722259,0.005396302,0.045964345],"category_scores_gemma":[0.0054473914,0.0008031926,0.0006756339,0.0041549373,0.008511189,0.0051895506,0.003651116,0.004480825,0.0077774483],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038530852,0.00006867301,0.0026427463,0.0005620754,0.0000055198866,0.0006766594,0.0071315435,0.0006758684,0.0008684175,0.72163147,0.2343134,0.03138511],"study_design_scores_gemma":[0.0000041352314,0.000009989052,0.0039886963,0.0003038785,0.0000022667043,0.00011170572,0.0012523286,0.00026045283,0.00012744352,0.01030999,0.98360044,0.000028821623],"about_ca_topic_score_codex":0.7259536,"about_ca_topic_score_gemma":0.79026407,"teacher_disagreement_score":0.95403564,"about_ca_system_score_codex":0.054773156,"about_ca_system_score_gemma":0.05168673,"threshold_uncertainty_score":0.5513207},"labels":[],"label_agreement":null},{"id":"W7100220259","doi":"","title":"IESO Stakeholder Advisory Committee Minutes of Meeting","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Stakeholder; Advisory committee; Plan (archaeology); Legislature; Representation (politics); Stakeholder engagement","score_opus":0.023560976389004108,"score_gpt":0.20233442838233587,"score_spread":0.17877345199333175,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100220259","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0050421907,0.0052601243,0.005924103,0.24858283,0.08020608,0.009166549,0.015705409,0.0011328923,0.6289797],"genre_scores_gemma":[0.022242278,0.004829606,0.006658928,0.05252082,0.016295562,0.005656152,0.010733154,0.0008752207,0.8801883],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.98475176,0.0036382494,0.0011733419,0.0010760345,0.006597466,0.0027630962],"domain_scores_gemma":[0.965169,0.0018800298,0.0013487797,0.0012195216,0.023305444,0.0070772604],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.023907172,0.001264793,0.0006876214,0.0025575394,0.0048235054,0.009332028,0.0019857904,0.0074194935,0.17436852],"category_scores_gemma":[0.028481405,0.00076039776,0.0009556122,0.0026911802,0.0008494739,0.0037404045,0.0062389025,0.006976288,0.08386774],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045787496,0.000020198588,0.00013425929,0.00013032666,0.0000020387167,0.000052170326,0.00028794367,0.000028585533,0.0003560122,0.0011715268,0.9853555,0.012415712],"study_design_scores_gemma":[0.0000037816096,0.000007716801,0.00031354622,0.00007747222,7.4548507e-7,0.000007669699,0.00033344724,0.000015339581,0.000053508444,0.00019115147,0.99899095,0.0000046931573],"about_ca_topic_score_codex":0.008000492,"about_ca_topic_score_gemma":0.012063011,"teacher_disagreement_score":0.17436852,"about_ca_system_score_codex":0.0067002038,"about_ca_system_score_gemma":0.025909454,"threshold_uncertainty_score":0.5833208},"labels":[],"label_agreement":null},{"id":"W7100420514","doi":"","title":"Date Raised","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volatility (finance); Schedule; Market clearing; Market price; Energy market; Market rate","score_opus":0.008525540827772233,"score_gpt":0.1450914455667136,"score_spread":0.13656590473894137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100420514","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012970316,0.0016257254,0.0024703448,0.006199593,0.025723517,0.0005998057,0.055955913,0.002183331,0.90394485],"genre_scores_gemma":[0.004977222,0.0011852538,0.0009551264,0.0019477777,0.0015092829,0.00015466055,0.022254745,0.0005526991,0.9664632],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988319,0.00010363321,0.000100586054,0.00025330315,0.0005309712,0.00017955547],"domain_scores_gemma":[0.99693465,0.00021925417,0.00013904383,0.0005607695,0.0016984817,0.00044772957],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0012932442,0.00087144127,0.00077644247,0.002127209,0.0016408656,0.005499512,0.001505808,0.001948828,0.67173976],"category_scores_gemma":[0.006090108,0.0004038602,0.00067135773,0.0018316347,0.00037925184,0.002706614,0.0025897166,0.0015896177,0.6191218],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010166323,0.000023426492,0.00037306926,0.00020595356,0.000005234704,0.000098132325,0.000044073,0.00008192642,0.0003814597,0.00725264,0.9417866,0.04964574],"study_design_scores_gemma":[0.0000057750435,0.000010400126,0.00037038524,0.000042061303,0.0000015770394,0.000036700694,0.000023216187,0.000017908387,0.00013312134,0.0004907519,0.9988642,0.000003902168],"about_ca_topic_score_codex":0.0044659968,"about_ca_topic_score_gemma":0.004851822,"teacher_disagreement_score":0.32826024,"about_ca_system_score_codex":0.0014869239,"about_ca_system_score_gemma":0.0018374501,"threshold_uncertainty_score":0.4682234},"labels":[],"label_agreement":null},{"id":"W7100705014","doi":"","title":"Abstract Energy Policy] (]]]])]]]–]]]","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volatility (finance); Electricity; Electricity market; Electricity price; Volatility swap; Volatility smile","score_opus":0.002173511391341893,"score_gpt":0.16429896050292805,"score_spread":0.16212544911158616,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100705014","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44063714,0.0037445892,0.034687214,0.0040833624,0.00033376846,0.00014233576,0.019701485,0.0003523019,0.49631795],"genre_scores_gemma":[0.96535003,0.0010532249,0.001561198,0.00010245389,0.00004372637,0.000011129959,0.002840834,0.00005081116,0.028986568],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.999574,0.000037609163,0.000013708958,0.000042135733,0.0002862351,0.00004636823],"domain_scores_gemma":[0.99948716,0.00004220132,0.000071544375,0.00004782483,0.00032471822,0.000026600257],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0002981534,0.00016763085,0.00023153979,0.00061693566,0.00055116613,0.002027944,0.00031491584,0.00022769632,0.015406632],"category_scores_gemma":[0.0009262674,0.00007849206,0.00025606723,0.0014437566,0.00035193027,0.00052933337,0.00026244944,0.00022793286,0.0012073376],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00067237235,0.00012827592,0.1846457,0.0006543873,0.00056654157,0.0007391766,0.0007403901,0.09870685,0.012378741,0.31778425,0.11387617,0.26910716],"study_design_scores_gemma":[0.00004388572,0.00015447657,0.32573056,0.00019155622,0.00013052496,0.0003927743,0.001798884,0.07815738,0.012360699,0.04808259,0.5328467,0.00010998496],"about_ca_topic_score_codex":0.24366817,"about_ca_topic_score_gemma":0.38018882,"teacher_disagreement_score":0.9845934,"about_ca_system_score_codex":0.004492375,"about_ca_system_score_gemma":0.0034270852,"threshold_uncertainty_score":0.48449975},"labels":[],"label_agreement":null},{"id":"W7100917335","doi":"","title":"FOURTH AMENDING AGREEMENT TO THE BRUCE POWER REFURBISHMENT IMPLEMENTATION AGREEMENT Between","year":2016,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Agreement; General partnership; Power (physics); Corporation; Receipt; Power of attorney","score_opus":0.012567173309488606,"score_gpt":0.254492918952684,"score_spread":0.24192574564319538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100917335","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005697949,0.00094555854,0.014750953,0.024560397,0.008323749,0.0033308603,0.005707796,0.0010148876,0.935668],"genre_scores_gemma":[0.020122387,0.00048564002,0.014406181,0.017385066,0.0010203419,0.0018557359,0.0028427574,0.00043096693,0.9414509],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.97165394,0.0036958088,0.0019213994,0.002210135,0.015477132,0.0050416496],"domain_scores_gemma":[0.96491754,0.0055476245,0.0008554028,0.003426952,0.023358554,0.0018938553],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.016588122,0.0010275983,0.0013792168,0.0022365684,0.008892561,0.009747259,0.005917727,0.02009217,0.057739004],"category_scores_gemma":[0.043179303,0.0021934195,0.002322631,0.0019601963,0.0032069953,0.0028732233,0.004331936,0.013969485,0.03969639],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019371677,0.00019455714,0.0010210581,0.0002060235,0.000029954363,0.00061639555,0.0013599069,0.0006052125,0.002097109,0.15742472,0.8175387,0.018712716],"study_design_scores_gemma":[0.000050277053,0.000052966996,0.002179421,0.00015089584,0.000024405688,0.00009880167,0.00030715798,0.00020865789,0.00066782336,0.0040163747,0.9921658,0.00007739575],"about_ca_topic_score_codex":0.3391591,"about_ca_topic_score_gemma":0.52119535,"teacher_disagreement_score":0.942261,"about_ca_system_score_codex":0.017773611,"about_ca_system_score_gemma":0.06709688,"threshold_uncertainty_score":0.67436993},"labels":[],"label_agreement":null},{"id":"W7101100400","doi":"","title":"Reference","year":2005,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Process (computing); Power (physics); Capital expenditure; Capital (architecture); Capital equipment","score_opus":0.006633364742468803,"score_gpt":0.18339118454602882,"score_spread":0.17675781980356,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7101100400","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0006845392,0.003120603,0.0043574544,0.011282426,0.009678976,0.00025965323,0.004940575,0.0011763013,0.9644995],"genre_scores_gemma":[0.006333981,0.002221064,0.0023802386,0.0031880513,0.00094454066,0.000117418385,0.005307425,0.0005091606,0.97899824],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99792767,0.00019945962,0.00012562258,0.0003540576,0.0011718668,0.000221334],"domain_scores_gemma":[0.9966041,0.00026823653,0.000081909624,0.00040173327,0.0024444407,0.0001997033],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0013926903,0.00076314976,0.00075678434,0.0026463154,0.003080646,0.0051072147,0.002463785,0.0033733407,0.51639354],"category_scores_gemma":[0.0074552353,0.00031888147,0.0006859714,0.0027073245,0.00093493535,0.004237658,0.0022224085,0.0021890565,0.3942383],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022842562,0.000022613822,0.00015181037,0.00013009473,0.0000025652068,0.00008088712,0.0001502293,0.00012424219,0.00025293056,0.029925384,0.9078198,0.06131657],"study_design_scores_gemma":[0.000002396604,0.0000045065335,0.00012846352,0.000063976186,0.0000012527793,0.00004169069,0.00006272257,0.000023864539,0.000097241245,0.00182673,0.99774337,0.000003901363],"about_ca_topic_score_codex":0.020794686,"about_ca_topic_score_gemma":0.0221703,"teacher_disagreement_score":0.48360646,"about_ca_system_score_codex":0.0042048683,"about_ca_system_score_gemma":0.0055882796,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W7116694939","doi":"10.18280/mmep.121127","title":"Push Spread Algorithm: A New Metaheuristic Algorithm to Solve Cases in Economic Load Dispatch Problem","year":2025,"lang":"","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Metaheuristic; Key (lock); Particle swarm optimization; Optimization algorithm; Algorithm design","score_opus":0.012557532964136805,"score_gpt":0.21620796632922773,"score_spread":0.20365043336509092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7116694939","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022247871,0.0005062276,0.97203964,0.00022441572,0.000148795,0.000105922,0.000056598452,0.00032629434,0.0043443306],"genre_scores_gemma":[0.3507636,0.00077085657,0.6372989,0.0002835436,0.00016799972,0.0006051962,0.00023943806,0.00027075203,0.009599729],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996012,0.00013158593,0.000020413525,0.000040218067,0.00017046844,0.000036187994],"domain_scores_gemma":[0.99942756,0.00032297187,0.000038881884,0.000036230565,0.00014444679,0.00003000828],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008582081,0.0009205758,0.0011062082,0.0013686919,0.00067595235,0.001039782,0.0013531143,0.0016382757,0.0027358828],"category_scores_gemma":[0.0019234391,0.000501516,0.0009006487,0.0014668781,0.00060516864,0.0013760974,0.0012420482,0.0012473803,0.0004858692],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012859007,0.0001310254,0.0008527022,0.00013867841,0.00015425113,0.00015411881,0.00010527384,0.8148739,0.004008949,0.01932695,0.0038512675,0.15627442],"study_design_scores_gemma":[0.000027313023,0.000029623445,0.00007724551,0.0000063569605,0.000013046224,0.000023086477,0.0000103397515,0.9946437,0.00046697538,0.0034387682,0.0012580375,0.0000055884734],"about_ca_topic_score_codex":0.0025844271,"about_ca_topic_score_gemma":0.0031581752,"teacher_disagreement_score":0.0027358828,"about_ca_system_score_codex":0.00038829868,"about_ca_system_score_gemma":0.000967461,"threshold_uncertainty_score":0.009152412},"labels":[],"label_agreement":null},{"id":"W7124160165","doi":"10.1109/codit66093.2025.11321880","title":"Optimizing Profile Block Bids in Short-Term Hydropower Scheduling: A Two-Phase Model for the Day-Ahead Market","year":2025,"lang":"","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; Université du Québec à Chicoutimi","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bidding; Block (permutation group theory); Electricity market; Hydropower; Production (economics); Scheduling (production processes); Set (abstract data type); Range (aeronautics); Electricity","score_opus":0.017013503876092656,"score_gpt":0.2929655988750061,"score_spread":0.2759520949989135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7124160165","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07500255,0.00025859594,0.91678715,0.00032582044,0.000057546407,0.00019460349,0.0002664835,0.00013636658,0.0069708475],"genre_scores_gemma":[0.92853755,0.0002365786,0.063274145,0.00007704939,0.0000324393,0.0003671563,0.0002374964,0.00007049713,0.007167104],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994271,0.00026318687,0.000014732776,0.000067847985,0.00011822871,0.00010892477],"domain_scores_gemma":[0.9993297,0.00038900998,0.00008075046,0.000027164187,0.000092385504,0.00008093156],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013577,0.0009061512,0.0014416258,0.00031989822,0.00047612903,0.0013560537,0.0015561306,0.0012827464,0.004165995],"category_scores_gemma":[0.0017408562,0.0008391668,0.0008615091,0.0006295395,0.0007020754,0.0014528836,0.0008355416,0.001362444,0.0004159553],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003459445,0.000019295041,0.00009458882,0.000011699462,0.0000061519922,0.000028269575,0.000009872627,0.99404305,0.00022488798,0.0039561884,0.00016089028,0.0014104813],"study_design_scores_gemma":[0.000005729184,0.000008912955,0.000023038356,5.8301185e-7,0.000001184758,0.000002576115,0.0000026773923,0.99896145,0.000037220707,0.00087273197,0.000082376944,0.0000015264854],"about_ca_topic_score_codex":0.0071886843,"about_ca_topic_score_gemma":0.006372864,"teacher_disagreement_score":0.0071886843,"about_ca_system_score_codex":0.00085139606,"about_ca_system_score_gemma":0.0017215458,"threshold_uncertainty_score":0.014293671},"labels":[],"label_agreement":null},{"id":"W7125228072","doi":"10.18280/mmep.121201","title":"Application of Kron’s Reduction Method to Evaluate Generating Unit Power Variability in the Kron Loss Model Under Economic Dispatch","year":2025,"lang":"","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Direcció General de Recerca, Generalitat de Catalunya","keywords":"Economic dispatch; Reduction (mathematics); Power (physics); Control theory (sociology); Electric power system; Unit (ring theory)","score_opus":0.018340621428359835,"score_gpt":0.2620081968630243,"score_spread":0.24366757543466444,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7125228072","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03255005,0.000035304383,0.96318907,0.000059735128,0.000020127249,0.00004364551,0.00009623955,0.00031650794,0.0036893783],"genre_scores_gemma":[0.7725368,0.000081207516,0.22293729,0.00003499313,0.000012105707,0.00016474197,0.00027324544,0.000256008,0.003703624],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99958307,0.0001625204,0.000018992452,0.00003654208,0.0001629436,0.000035983918],"domain_scores_gemma":[0.9988839,0.00062305265,0.00011617106,0.0001487454,0.00020374525,0.000024399918],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012440024,0.0007286786,0.00050495355,0.0006495035,0.00026176893,0.000679873,0.0007067413,0.00033389413,0.0018142617],"category_scores_gemma":[0.0026164611,0.0002765104,0.000682959,0.00050233933,0.00047615697,0.00083477923,0.0005479074,0.0009998035,0.0002994744],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004003895,0.000031557458,0.0006137257,0.000030222467,0.00001285049,0.000036605124,0.00002300261,0.9684371,0.0015645154,0.008792996,0.00041048846,0.020006953],"study_design_scores_gemma":[0.0000017224745,0.000013713677,0.00010639462,0.0000014146707,0.0000014642436,0.0000067213205,0.0000039050483,0.99815446,0.00051091483,0.0010032882,0.00019365805,0.000002446048],"about_ca_topic_score_codex":0.0052227536,"about_ca_topic_score_gemma":0.006080112,"teacher_disagreement_score":0.0052227536,"about_ca_system_score_codex":0.00062209414,"about_ca_system_score_gemma":0.0012234179,"threshold_uncertainty_score":0.010384738},"labels":[],"label_agreement":null},{"id":"W7126263680","doi":"10.5281/zenodo.18440600","title":"GDP Impacts of Trans Mountain Oil Pipeline Crown Corporation in Canada","year":2025,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Revenue; Corporation; Capital expenditure; Government (linguistics); Economic impact analysis; Production (economics); Pipeline (software); Government revenue; Government spending","score_opus":0.010096952141807418,"score_gpt":0.19821629247183473,"score_spread":0.1881193403300273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7126263680","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6492883,0.0034089948,0.0058473987,0.012633169,0.00020002991,0.00014302463,0.018308356,0.0005699708,0.30960077],"genre_scores_gemma":[0.9741876,0.0020186189,0.0010938036,0.00020784726,0.000007287672,0.000021003982,0.0028348889,0.000051308463,0.019577678],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934024,0.00005824631,0.000008860093,0.00004352283,0.00028507045,0.00026412573],"domain_scores_gemma":[0.9994399,0.000055226315,0.000044610493,0.0000193649,0.00030864959,0.0001322233],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004603083,0.00066342193,0.00035613004,0.0009200094,0.0017753004,0.0027701699,0.0005935167,0.00063383905,0.0054267477],"category_scores_gemma":[0.0016380785,0.00027274192,0.000599723,0.0019223263,0.0010755915,0.00091626047,0.0010073949,0.0012622597,0.00032317603],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047559437,0.00013615811,0.037017904,0.00024657903,0.00019158896,0.0012385738,0.0004187103,0.6548508,0.0017517888,0.19442141,0.070543885,0.03870702],"study_design_scores_gemma":[0.00021269498,0.0002877607,0.08971127,0.0003022328,0.00025982806,0.00045367877,0.0045197513,0.52880096,0.0054308,0.034544144,0.3351936,0.0002833374],"about_ca_topic_score_codex":0.9839192,"about_ca_topic_score_gemma":0.9825095,"teacher_disagreement_score":0.050305285,"about_ca_system_score_codex":0.050305285,"about_ca_system_score_gemma":0.04733924,"threshold_uncertainty_score":0.36499208},"labels":[],"label_agreement":null},{"id":"W7126285806","doi":"","title":"Las cuentas trimestrales del sector eléctrico español: su elaboración en el periodo 1987-1996","year":2001,"lang":"es","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Electricity; Public sector; Period (music); Financial sector; Secondary sector of the economy","score_opus":0.008382337684560587,"score_gpt":0.24685326624445825,"score_spread":0.23847092855989765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7126285806","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9279446,0.013765442,0.002565977,0.0013297586,0.00006222312,0.000080434744,0.01478078,0.00009563019,0.039375264],"genre_scores_gemma":[0.9360762,0.0123345,0.0031890937,0.00020020477,0.00007781479,0.000058848196,0.020345168,0.000051494324,0.02766667],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99952257,0.000060841758,0.000030642215,0.00008785862,0.00018974404,0.00010845854],"domain_scores_gemma":[0.99854183,0.0003465175,0.00039844384,0.000107214546,0.0005395301,0.00006642124],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010437598,0.0002407498,0.00033309043,0.0019327482,0.00028754654,0.0012359216,0.00039867323,0.00027182917,0.0034867828],"category_scores_gemma":[0.002652348,0.0002071048,0.00031510356,0.006448414,0.00032772735,0.0007250437,0.00059584563,0.0004355357,0.00058012735],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008752742,0.00025980515,0.64474183,0.0008926434,0.000274649,0.000960551,0.0030832593,0.017721342,0.0018625394,0.011102353,0.025934355,0.2922914],"study_design_scores_gemma":[0.00002607256,0.000083892875,0.87704784,0.00019301169,0.00011563005,0.00014199308,0.0043927706,0.0028398938,0.0019281703,0.001525328,0.111688085,0.000017448421],"about_ca_topic_score_codex":0.14540681,"about_ca_topic_score_gemma":0.17999406,"teacher_disagreement_score":0.14540681,"about_ca_system_score_codex":0.00280304,"about_ca_system_score_gemma":0.002109183,"threshold_uncertainty_score":0.2891209},"labels":[],"label_agreement":null},{"id":"W7126874432","doi":"","title":"Análisis comparativo de las tarifas eléctricas en la Unión Europea","year":2000,"lang":"es","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"European union; Quarter (Canadian coin); Western europe","score_opus":0.0041967692350946524,"score_gpt":0.21616325815040374,"score_spread":0.2119664889153091,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7126874432","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9568446,0.0050497763,0.0060627777,0.00017986524,0.000020365906,0.000035255336,0.0027568713,0.00008450728,0.028965963],"genre_scores_gemma":[0.99072754,0.0016964661,0.0025557312,0.00003292052,0.00001226349,0.000024577592,0.0016040176,0.000034572313,0.0033118217],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9987054,0.0004001394,0.00010415161,0.00020750864,0.0004457429,0.0001370322],"domain_scores_gemma":[0.9984346,0.00057207217,0.00028502976,0.00010160732,0.0005700712,0.000036517224],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017947808,0.00027596575,0.0006148662,0.0037711347,0.00027427732,0.0017250396,0.0002510941,0.00038003523,0.0024585614],"category_scores_gemma":[0.0035554795,0.00011003027,0.00064098556,0.007175849,0.00018776215,0.0005686851,0.000431635,0.00026643826,0.00034213165],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001806563,0.0002093667,0.6067921,0.0010046649,0.0017994648,0.00043011626,0.0013431888,0.0648228,0.008688439,0.010238497,0.0029027408,0.299962],"study_design_scores_gemma":[0.00003741226,0.0004514121,0.94110066,0.00019300518,0.00039888985,0.0002904998,0.0034808519,0.00857147,0.0042022844,0.0019123063,0.039322548,0.00003857391],"about_ca_topic_score_codex":0.020166734,"about_ca_topic_score_gemma":0.015757382,"teacher_disagreement_score":0.020166734,"about_ca_system_score_codex":0.00084665447,"about_ca_system_score_gemma":0.000490061,"threshold_uncertainty_score":0.040098667},"labels":[],"label_agreement":null},{"id":"W7130700782","doi":"10.1109/giest66547.2025.11387152","title":"Optimizing Short-Term Hydrothermal Dispatch: A Robust Solution via Artificial Protozoa Optimizer","year":2025,"lang":"","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Horizon College and Seminary","funders":"","keywords":"Scheduling (production processes); Computation; Optimization problem; Cuckoo search; Evolutionary algorithm; Optimization algorithm; Sine; Hydrothermal circulation","score_opus":0.01622701125226706,"score_gpt":0.23383509236560332,"score_spread":0.21760808111333627,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7130700782","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14332914,0.00086936174,0.84225416,0.00053751405,0.00015542342,0.00013102962,0.00015641894,0.0004948068,0.012072144],"genre_scores_gemma":[0.8877198,0.0002853154,0.10804213,0.00010704849,0.000054875454,0.00016792,0.00012397383,0.000060552,0.0034382718],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99985886,0.000045138517,0.000007128022,0.000030322088,0.000036948968,0.00002157532],"domain_scores_gemma":[0.9996182,0.00023863878,0.000051700983,0.000014452704,0.00005642399,0.00002058978],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005176498,0.00075181737,0.00069185,0.000320653,0.00030060115,0.00070270937,0.0006508106,0.0008923231,0.0014302009],"category_scores_gemma":[0.0011869813,0.00036403316,0.00054202066,0.00029027846,0.0005449568,0.00038487118,0.00057888456,0.0007228233,0.00015098434],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030106878,0.000010771775,0.00018707277,0.000028740378,0.000019990961,0.000027791146,0.000009331649,0.9905806,0.0007615479,0.0016095691,0.00023028784,0.0065041063],"study_design_scores_gemma":[0.0000064907417,0.000016570975,0.000047305326,0.0000016936166,0.0000033492606,0.0000036613285,0.0000030253545,0.9992417,0.0001387467,0.00035758116,0.00017825472,0.000001594858],"about_ca_topic_score_codex":0.0044414545,"about_ca_topic_score_gemma":0.0027145995,"teacher_disagreement_score":0.0044414545,"about_ca_system_score_codex":0.0004886257,"about_ca_system_score_gemma":0.0010756687,"threshold_uncertainty_score":0.008831203},"labels":[],"label_agreement":null},{"id":"W7130956803","doi":"10.3808/jeil.202400164","title":"Development of An Interval Chance-Constrained Mixed-Integer Linear Programming Model for Electric Power System Planning — A Case Study for the Province of Alberta, Canada","year":2025,"lang":"","type":"article","venue":"Journal of Environmental Informatics Letters","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Linear programming; Electric power system; Electricity generation; Electricity; Modular design; Interval (graph theory); Profit (economics); Key (lock); Mains electricity","score_opus":0.007688159295276665,"score_gpt":0.21625306692491064,"score_spread":0.20856490762963398,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7130956803","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4044731,0.0010384376,0.5020681,0.002148618,0.00008525206,0.0005609679,0.0027439028,0.00051568943,0.08636589],"genre_scores_gemma":[0.9308554,0.0003076632,0.058535457,0.00007018908,0.00001385687,0.00017303217,0.00051999855,0.000038163183,0.0094862655],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996271,0.00012738541,0.000009435632,0.00004072717,0.00009074146,0.00010467751],"domain_scores_gemma":[0.99938405,0.00036669665,0.00004547541,0.000015535912,0.00013712414,0.000051097737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008432218,0.00085554476,0.00056772004,0.0006502669,0.0009627559,0.0018492135,0.0014412757,0.0011166678,0.0029779759],"category_scores_gemma":[0.0013285683,0.00054950855,0.00067970523,0.0011291434,0.00082557567,0.00045203138,0.0006357148,0.00094867015,0.00014904399],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019415593,0.000012924535,0.0004864455,0.000013468696,0.0000053769377,0.0000630274,0.000018153916,0.99329245,0.00012012958,0.0036665173,0.00032651273,0.001975603],"study_design_scores_gemma":[0.000010208911,0.000009595454,0.00020677208,0.000004095946,0.0000045271713,0.0000062269205,0.0000341757,0.99829537,0.00007606284,0.0008230581,0.0005252938,0.0000045480206],"about_ca_topic_score_codex":0.7083209,"about_ca_topic_score_gemma":0.71013033,"teacher_disagreement_score":0.29167908,"about_ca_system_score_codex":0.009265019,"about_ca_system_score_gemma":0.012355345,"threshold_uncertainty_score":0.58679366},"labels":[],"label_agreement":null},{"id":"W7132884331","doi":"","title":"ELFORSPOT: an equilibrium model of the combined forward market and spot market for electricity, using complementarity programming","year":2004,"lang":"","type":"dissertation","venue":"TSpace","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Spot market; Complementarity (molecular biology); Forward contract; Spot contract; Electricity market; Electricity; Forward market; Forward price","score_opus":0.024940976131321794,"score_gpt":0.3011090744012371,"score_spread":0.2761680982699153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7132884331","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04492337,0.00022355061,0.9113458,0.00059734937,0.000057707537,0.000111273024,0.0005641423,0.00023588129,0.041940864],"genre_scores_gemma":[0.8067679,0.0004555698,0.15370995,0.00017366523,0.0000431662,0.0003588727,0.00043503538,0.000117203475,0.037938625],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996704,0.00013417644,0.00000853554,0.000047544756,0.00007230115,0.00006694541],"domain_scores_gemma":[0.9997367,0.00013869752,0.000037677004,0.00001248642,0.00004308556,0.000031336032],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00056884316,0.00068302185,0.0006357133,0.0005106778,0.00058973016,0.0014079134,0.0012978171,0.0012905508,0.006141281],"category_scores_gemma":[0.000997426,0.000569966,0.000861556,0.00076732493,0.001207007,0.0013686364,0.0011247676,0.0010416068,0.00046221504],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036061916,0.000024369947,0.00011155444,0.000021990938,0.000010566905,0.000053196072,0.00003696773,0.9286414,0.00042620563,0.06748601,0.0008621463,0.0022894824],"study_design_scores_gemma":[0.000012485951,0.000013988631,0.000031511427,0.0000027314031,0.0000028659247,0.000011168014,0.000008879223,0.9868385,0.0000995266,0.011872104,0.0011012307,0.0000048621896],"about_ca_topic_score_codex":0.015838046,"about_ca_topic_score_gemma":0.014446101,"teacher_disagreement_score":0.015838046,"about_ca_system_score_codex":0.0015618607,"about_ca_system_score_gemma":0.0024255302,"threshold_uncertainty_score":0.031491756},"labels":[],"label_agreement":null},{"id":"W7132939890","doi":"","title":"ELEMCOMP: an equilibrium model of combined electric generation and emissions competition using complementarity programming","year":2003,"lang":"","type":"dissertation","venue":"TSpace","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Profitability index; Oligopoly; Electricity; Imperfect competition; Electricity generation; Electricity market; Complementarity (molecular biology); Competition (biology); Perfect competition","score_opus":0.0445677092930877,"score_gpt":0.3186151487338364,"score_spread":0.2740474394407487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7132939890","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06731511,0.0003894291,0.8452988,0.0010375514,0.00006725306,0.00014214421,0.0011882876,0.0003226666,0.08423875],"genre_scores_gemma":[0.88990307,0.00041205945,0.072178856,0.00017243701,0.000039544826,0.00031174574,0.00040992646,0.000097767566,0.036474578],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997267,0.000090278234,0.00000659227,0.00004008178,0.00006448732,0.000071911454],"domain_scores_gemma":[0.9997615,0.00012599982,0.000029369196,0.00001142096,0.000040069033,0.000031724554],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004360138,0.0005596816,0.0006503828,0.0004879652,0.0006934531,0.0012064064,0.0015250907,0.0012843625,0.0070631565],"category_scores_gemma":[0.0008072093,0.00048457214,0.00074569666,0.0009839301,0.0012279962,0.00101314,0.001207126,0.0010430625,0.00044641708],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002404365,0.000016762615,0.00016260192,0.000021655522,0.00000982969,0.00006269544,0.000035852616,0.9181817,0.0003275862,0.07809795,0.0009791959,0.0020802708],"study_design_scores_gemma":[0.000018787578,0.000012551716,0.00007393767,0.0000032233966,0.0000037534037,0.000014054655,0.000014709219,0.98206776,0.000089912355,0.015738767,0.0019570545,0.000005569126],"about_ca_topic_score_codex":0.05979963,"about_ca_topic_score_gemma":0.049282532,"teacher_disagreement_score":0.05979963,"about_ca_system_score_codex":0.002755702,"about_ca_system_score_gemma":0.0031257086,"threshold_uncertainty_score":0.11890316},"labels":[],"label_agreement":null},{"id":"W7162035656","doi":"10.82308/35590","title":"Wind power integration in electrical networks with transmission congestion: operational complications and efficient solutions","year":2013,"lang":"en","type":"dissertation","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Power system simulation; Electric power system; Grid; Scheduling (production processes); Electric power transmission; Unit (ring theory); Resource (disambiguation); Electric power","score_opus":0.005812687722216487,"score_gpt":0.2045501951492464,"score_spread":0.19873750742702992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7162035656","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09241119,0.0041606952,0.87028813,0.0041470304,0.0002388047,0.00010499589,0.00008787153,0.00013324506,0.028427973],"genre_scores_gemma":[0.9282874,0.004848291,0.060786147,0.00015467344,0.0001817247,0.00008348456,0.00006766139,0.000040921856,0.0055498984],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959034,0.00019519411,0.00001718479,0.000050118473,0.000097221615,0.00004996533],"domain_scores_gemma":[0.9996275,0.00022023966,0.000047638023,0.00003875963,0.000044383367,0.000021473636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085914903,0.00054196076,0.0004973358,0.00023306851,0.000409726,0.0017289023,0.0008489613,0.000723358,0.0015422403],"category_scores_gemma":[0.0021385797,0.00037054677,0.0004353817,0.0006590177,0.00083669956,0.0016205126,0.0011334172,0.0014343747,0.00013759479],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034709774,0.000022236572,0.00048823844,0.00007251012,0.000027042259,0.00012963547,0.000075039134,0.81823266,0.0005641197,0.14515896,0.0011072241,0.034087554],"study_design_scores_gemma":[0.00001242948,0.00003204751,0.00019984665,0.00003609103,0.00001052822,0.000042963267,0.00011800232,0.9114846,0.00025343872,0.084605254,0.0031961089,0.000008676662],"about_ca_topic_score_codex":0.0038513076,"about_ca_topic_score_gemma":0.003858597,"teacher_disagreement_score":0.0038513076,"about_ca_system_score_codex":0.00091636175,"about_ca_system_score_gemma":0.0010245197,"threshold_uncertainty_score":0.0076577663},"labels":[],"label_agreement":null},{"id":"W7164915702","doi":"10.1080/17153379.2004.12554037","title":"State Power and the Logic of Reform in China's Electricity Sector","year":2004,"lang":"en","type":"article","venue":"Pacific Affairs","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity; State (computer science); Power (physics); Electricity retailing; Mains electricity; Electric power industry","score_opus":0.0035933247028014288,"score_gpt":0.1754792128269343,"score_spread":0.17188588812413286,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7164915702","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4751959,0.003111797,0.0129815955,0.08516609,0.0002733147,0.000090522095,0.00027106548,0.00007248089,0.42283714],"genre_scores_gemma":[0.9947072,0.0003224926,0.00028155465,0.0006306173,0.00006910916,0.000014284868,0.000011384414,0.0000047026374,0.0039586625],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991941,0.00025282125,0.000024559547,0.00009630254,0.00018718491,0.0002451332],"domain_scores_gemma":[0.998938,0.00043528053,0.00016172355,0.00008850554,0.00026884268,0.00010758121],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017486637,0.00020312578,0.00037178784,0.0009200221,0.0024980477,0.0056153513,0.00049294817,0.0016362696,0.0037718317],"category_scores_gemma":[0.004700103,0.00021653001,0.00031611093,0.0013482255,0.009773672,0.0035393876,0.0016352673,0.0026974652,0.00011262821],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020316636,0.000010591854,0.0012717283,0.000013413807,0.0000064701953,0.000043994016,0.00033191594,0.002099816,0.0000410322,0.9917402,0.0013400441,0.003080334],"study_design_scores_gemma":[0.000045630102,0.000031259915,0.0058532795,0.00004625859,0.000029024788,0.000013855055,0.00095325307,0.0063772015,0.00016696847,0.9716476,0.014818936,0.000016655616],"about_ca_topic_score_codex":0.05887459,"about_ca_topic_score_gemma":0.07709384,"teacher_disagreement_score":0.05887459,"about_ca_system_score_codex":0.009425795,"about_ca_system_score_gemma":0.012471645,"threshold_uncertainty_score":0.11706376},"labels":[],"label_agreement":null},{"id":"W754628560","doi":"","title":"Large-scale Solar PV Investment Planning Studies","year":2011,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Scale (ratio); Photovoltaic system; Investment (military); Environmental science; Business; Geography; Engineering; Political science; Cartography; Electrical engineering","score_opus":0.013484665237233774,"score_gpt":0.20285283068284385,"score_spread":0.18936816544561008,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W754628560","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54052836,0.008803394,0.26758078,0.0038939698,0.00022624913,0.0005015355,0.0019924701,0.00029262793,0.17618059],"genre_scores_gemma":[0.9649084,0.0039729406,0.01974045,0.000104569925,0.00007436455,0.00013578855,0.00050022843,0.000043078857,0.01052002],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996258,0.00017830657,0.00001545659,0.00006246507,0.00006537213,0.000052492825],"domain_scores_gemma":[0.9981894,0.0014150726,0.00013479532,0.00006590076,0.00013305477,0.00006173852],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010404473,0.0006205976,0.00066036376,0.00057578983,0.00043166094,0.0015457975,0.00090273254,0.00081560994,0.005551496],"category_scores_gemma":[0.0032042814,0.00053315004,0.00070811727,0.0014583902,0.000509008,0.0014096039,0.000589977,0.001256664,0.00028847274],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003535175,0.00011748736,0.0014817863,0.00015541587,0.000048403588,0.0002343241,0.00006242957,0.95144373,0.00020643011,0.029767182,0.0017428201,0.014704695],"study_design_scores_gemma":[0.000017181528,0.00006807595,0.0012445155,0.00006184404,0.00002632724,0.00004892266,0.00022797726,0.97632116,0.000358485,0.017841777,0.0037683002,0.000015399835],"about_ca_topic_score_codex":0.013352377,"about_ca_topic_score_gemma":0.01602292,"teacher_disagreement_score":0.013352377,"about_ca_system_score_codex":0.0020084784,"about_ca_system_score_gemma":0.0013187797,"threshold_uncertainty_score":0.02654928},"labels":[],"label_agreement":null},{"id":"W77701045","doi":"10.1007/0-387-25477-3_8","title":"Generalized Uplifts in Pool-Based Electricity Markets","year":2005,"lang":"en","type":"book-chapter","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Electricity; Business; Economics; Commerce; Physics","score_opus":0.00721964928960189,"score_gpt":0.19000332638757905,"score_spread":0.18278367709797716,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W77701045","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04772814,0.0078013884,0.45003042,0.0051879548,0.0016132196,0.000098481985,0.0002773938,0.00033268245,0.48693028],"genre_scores_gemma":[0.661602,0.0072235903,0.064375296,0.00097442133,0.0013726666,0.00021515737,0.00026207994,0.00039574062,0.26357916],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99971896,0.0000844912,0.000015689902,0.000040871968,0.00010113527,0.000038782106],"domain_scores_gemma":[0.99978846,0.00008296547,0.000020781998,0.000044966448,0.00004350163,0.000019373907],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007370527,0.00066522,0.000828168,0.0004970415,0.0007615243,0.0017048052,0.0011712048,0.0009621823,0.012177131],"category_scores_gemma":[0.001921217,0.00043814746,0.0010890746,0.0009673587,0.0015751603,0.0039794436,0.0013732924,0.002173456,0.0012896077],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010210676,0.000011534967,0.00003037929,0.000025605113,0.0000056889426,0.000037425223,0.000032555068,0.008203258,0.00017723268,0.9756817,0.005694485,0.010089953],"study_design_scores_gemma":[0.0000071548734,0.000007961569,0.000049731112,0.000010707681,0.0000032236164,0.000040822113,0.000014772219,0.018697212,0.00009482216,0.9718383,0.009230654,0.0000045822203],"about_ca_topic_score_codex":0.0011860874,"about_ca_topic_score_gemma":0.001248676,"teacher_disagreement_score":0.012177131,"about_ca_system_score_codex":0.00093267416,"about_ca_system_score_gemma":0.0006896398,"threshold_uncertainty_score":0.040736616},"labels":[],"label_agreement":null},{"id":"W975443591","doi":"10.11575/prism/24831","title":"An Analysis of Market Power in the Alberta Electricity Market","year":2013,"lang":"en","type":"dissertation","venue":"PRISM (University of Calgary)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity market; Market power; Market analysis; Electricity; Power market; Business; Power (physics); Economics; Engineering; Electrical engineering; Market economy; Electric power system; Marketing; Physics","score_opus":0.0027922274148902398,"score_gpt":0.17391489151787518,"score_spread":0.17112266410298493,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W975443591","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93417233,0.00046770117,0.007253216,0.000985324,0.000014670913,0.00004258758,0.00035572468,0.00003186713,0.05667654],"genre_scores_gemma":[0.995395,0.00016754259,0.0007059446,0.000015937014,0.00000856334,0.0000051918882,0.0001507033,0.000004921909,0.0035463287],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99964035,0.00005558012,0.0000052767305,0.000030195228,0.000196398,0.00007224045],"domain_scores_gemma":[0.99921465,0.0004114661,0.00009987724,0.000029207202,0.00018624608,0.000058525286],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005300476,0.00018157196,0.00019690151,0.0009182435,0.0004660855,0.0014186747,0.00058009586,0.00022706286,0.0036282195],"category_scores_gemma":[0.0028662703,0.0001601399,0.00027918298,0.0014751182,0.00090778625,0.000708863,0.00045304207,0.00048453928,0.00012752779],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003574841,0.00021846802,0.1377855,0.00012275761,0.00019010424,0.0008846272,0.001910128,0.38670602,0.0039308635,0.38376856,0.0077678394,0.07635772],"study_design_scores_gemma":[0.00005561575,0.000112425565,0.28402135,0.000041516814,0.00006249422,0.00008557904,0.0028211868,0.6363767,0.001186458,0.058835655,0.016339272,0.00006169391],"about_ca_topic_score_codex":0.42373177,"about_ca_topic_score_gemma":0.42970872,"teacher_disagreement_score":0.5762682,"about_ca_system_score_codex":0.0064172726,"about_ca_system_score_gemma":0.0032730072,"threshold_uncertainty_score":0.8425307},"labels":[],"label_agreement":null}]}