{"meta":{"query_hash":"1e90e0904200","filters":{"topic":"Electric Power System Optimization"},"cohort_total":904,"direct_labels_cover":0,"predictions_cover":904,"exported":904,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/1e90e0904200","api":"https://metacan.xera.ac/api/v1/cohort?topic=Electric+Power+System+Optimization"},"results":[{"id":"W144514668","doi":"10.15173/esr.v12i2.457","title":"Restructuring the Regulatory Framework in Developing Countries","year":2004,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Restructuring; Incentive; Developing country; Regulatory reform; Process (computing); Electricity; Industrial organization; Corporate governance; Business; Economics; Electricity market; Economic system; Market economy; Economic growth; Finance; Computer science","score_opus":0.014210790690900721,"score_gpt":0.2526113857444959,"score_spread":0.23840059505359515,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W144514668","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010918761,0.97687304,0.018031877,0.0019226476,0.0005213543,0.00015249674,3.6035672e-7,0.00016596333,0.0012403685],"genre_scores_gemma":[0.096547484,0.8983647,0.0033946119,0.0014401964,0.00008952062,0.00009978169,0.0000013748453,0.00002899262,0.000033326254],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99915075,0.000041063457,0.00032972204,0.00012931762,0.00014422822,0.00020493536],"domain_scores_gemma":[0.9995554,0.000095616844,0.000045319634,0.00024804482,0.000040415165,0.000015214397],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023935435,0.00014355493,0.00029966456,0.000045111814,0.000086517386,0.00001206451,0.000147047,0.000043387605,0.000004436003],"category_scores_gemma":[0.00012574362,0.00010243584,0.000033953555,0.00046674762,0.000035131747,0.00007518503,0.000040083236,0.0001056062,0.0000061600776],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000036728554,0.0000075435523,0.0003608107,0.009638592,0.0005149389,0.000045900142,0.0021189398,0.3691482,0.0000055991727,0.5837757,0.0074475165,0.026932614],"study_design_scores_gemma":[0.00037544852,0.000020104766,0.002564415,0.033868812,0.000084646344,0.000052278407,0.00015269688,0.00032466347,0.0009182844,0.011504696,0.9493409,0.0007930891],"about_ca_topic_score_codex":0.000011566263,"about_ca_topic_score_gemma":0.00007418325,"teacher_disagreement_score":0.94189334,"about_ca_system_score_codex":0.00036429847,"about_ca_system_score_gemma":0.00003201572,"threshold_uncertainty_score":0.41772124},"labels":[],"label_agreement":null},{"id":"W1493069469","doi":"","title":"How Standard Oil Came to Canada: The Monopolization of Canadian Petroleum Refining, 1989-1998","year":2004,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Monopolization; Refining (metallurgy); Petroleum; Oil refinery; Crude oil; Petroleum engineering; Environmental science; Economics; Natural resource economics; Engineering; Waste management; Geology; Metallurgy; Materials science; Monopoly; Market economy","score_opus":0.01357097191980539,"score_gpt":0.22941985014032068,"score_spread":0.2158488782205153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1493069469","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45376277,0.002681679,0.0015256717,0.010364377,0.0058093998,0.0024446354,0.002417715,0.00039817905,0.5205956],"genre_scores_gemma":[0.99321914,0.0033875124,0.00050726207,0.000057495883,0.00013914732,0.00019380028,0.0001152661,0.000119563694,0.002260815],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976021,0.0001282647,0.0005479182,0.00046960727,0.00038616356,0.0008659692],"domain_scores_gemma":[0.9983148,0.00014053758,0.00012046331,0.0009282576,0.00015062935,0.0003453165],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009264756,0.0002936098,0.0004839352,0.0013153988,0.00011898304,0.00015806154,0.0007428583,0.00031600674,0.0000082511015],"category_scores_gemma":[0.00036125726,0.0003032874,0.00006725834,0.00053799775,0.00006171334,0.00005958702,0.00019083392,0.0010302921,0.0000016172684],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":true,"study_design_scores_codex":[0.000012248577,0.000004419675,0.0005282792,0.00019881353,0.000068271926,0.000012230351,0.00036320675,0.9789877,0.000026769727,0.00023591598,0.0004322061,0.01912995],"study_design_scores_gemma":[0.0014714642,0.00026195694,0.0026894521,0.0017478069,0.000049316037,0.000034311764,0.0020773287,0.36487085,0.0020766603,0.00028434233,0.6224508,0.001985674],"about_ca_topic_score_codex":0.86667645,"about_ca_topic_score_gemma":0.99502283,"teacher_disagreement_score":0.62201864,"about_ca_system_score_codex":0.011420997,"about_ca_system_score_gemma":0.0067939586,"threshold_uncertainty_score":0.99994195},"labels":[],"label_agreement":null},{"id":"W1493792108","doi":"10.1023/a:1023370211456","title":"Uncertainty and Investment in Electricity Generation with an Application to the Case of Hydro-Québec","year":2003,"lang":"en","type":"article","venue":"Annals of Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Alberta Energy; University of Alberta","funders":"","keywords":"Competition (biology); Restructuring; Theory of computation; Computer science; Operations research; Linear programming; Investment (military); Duration (music); Process (computing); Mathematical optimization; Face (sociological concept); Simple (philosophy); Economics; Mathematics; Finance","score_opus":0.06937511628807928,"score_gpt":0.35677123309641456,"score_spread":0.28739611680833527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1493792108","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96642816,0.00035308086,0.031052677,0.00040652492,0.000007032286,0.0007644831,0.0000043847567,0.000012079523,0.000971585],"genre_scores_gemma":[0.9985651,0.00006627071,0.0010696352,0.00003814892,0.000011568375,0.00019131484,0.000010593135,0.000009982046,0.000037379526],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99909306,0.00023923776,0.00021277503,0.00013045428,0.00016694074,0.0001575326],"domain_scores_gemma":[0.9992781,0.00005399006,0.000011815926,0.00024793026,0.0003538389,0.00005432436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010974307,0.000060929884,0.00009390129,0.00024294693,0.000099977195,0.000028677394,0.00007492744,0.00003364071,0.000004805453],"category_scores_gemma":[0.00013261804,0.000046224497,0.0000074604754,0.0009249546,0.000033518005,0.0001439899,0.000008222484,0.00010535032,0.0000017701303],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000070629417,0.000046192654,0.00016466323,0.000015514612,0.000010287981,0.000003050177,0.0007683654,0.9813432,0.008242927,0.007704344,0.00021164383,0.0014827546],"study_design_scores_gemma":[0.00012976256,0.00027669314,0.00015998712,0.000009385171,0.0000022719166,0.000037778813,0.00014695265,0.9505844,0.048236925,0.00005379045,0.0002998077,0.00006225749],"about_ca_topic_score_codex":0.0074646883,"about_ca_topic_score_gemma":0.05832695,"teacher_disagreement_score":0.05086226,"about_ca_system_score_codex":0.000055865992,"about_ca_system_score_gemma":0.00014077894,"threshold_uncertainty_score":0.9991447},"labels":[],"label_agreement":null},{"id":"W1500452035","doi":"10.1109/pess.2002.1043668","title":"Transmission congestion relief by economic load management","year":2003,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Congestion management; Network congestion; Computer science; Transmission (telecommunications); Load management; Computer network; Electricity; Telecommunications; Electric power system; Engineering; Power (physics); Electrical engineering","score_opus":0.0024954385171963613,"score_gpt":0.16693798482172376,"score_spread":0.1644425463045274,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1500452035","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029880884,0.00078219565,0.6022547,0.000038273054,0.0002963013,0.00019999649,9.3065717e-7,0.00041308926,0.3930264],"genre_scores_gemma":[0.9852649,0.0007405711,0.006702351,0.000029154944,0.000010961118,0.000022687544,0.000011045026,0.000031328924,0.007187025],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995548,0.000014723587,0.00013678904,0.000104528175,0.00006334952,0.00012582491],"domain_scores_gemma":[0.99982846,0.000007726509,0.000010514298,0.00010535016,0.0000070363003,0.000040927556],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010112893,0.000079539364,0.00006857734,0.000035717203,0.000022395536,0.000016910273,0.00004307889,0.000045858156,0.00028061366],"category_scores_gemma":[0.0000014545195,0.00008111751,0.000017694863,0.00005678496,0.0000030583303,0.00008144293,0.0000016338166,0.000037020138,0.00018598043],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000967415,0.00004912736,0.00015703909,0.00020875591,0.00012481502,0.000004901185,0.00016053868,0.5848407,0.004195856,0.025882585,0.34316885,0.041197106],"study_design_scores_gemma":[0.0011874645,0.000054664884,0.00013386905,0.00005158699,0.000036349924,0.0000138994965,0.000034330893,0.2826424,0.02875706,0.00026769773,0.68634045,0.00048020942],"about_ca_topic_score_codex":0.0000059389135,"about_ca_topic_score_gemma":0.0000016842391,"teacher_disagreement_score":0.9822768,"about_ca_system_score_codex":0.00023755695,"about_ca_system_score_gemma":0.0000070909036,"threshold_uncertainty_score":0.33078763},"labels":[],"label_agreement":null},{"id":"W1505385814","doi":"10.1109/34084poweri.2014.7117633","title":"Optimization of co-generation system operation","year":2014,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Cogeneration; Integer programming; Linear programming; Mathematical optimization; Computer science; Selection (genetic algorithm); Optimization problem; Electricity generation; Mathematics; Power (physics)","score_opus":0.00669610139861456,"score_gpt":0.18856246924598355,"score_spread":0.18186636784736898,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1505385814","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0038113515,0.000030027617,0.9513962,0.000006729919,0.00027206424,0.00015190002,0.0000011683528,0.00034638122,0.043984167],"genre_scores_gemma":[0.9812315,0.000007886715,0.018443825,0.000006997455,0.0000974334,0.000013648783,0.00008055904,0.000019719537,0.000098397686],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994081,0.00004221924,0.00025809914,0.000086086446,0.00012031724,0.00008515391],"domain_scores_gemma":[0.9997154,0.000014412907,0.00003640581,0.00014085324,0.000068299014,0.000024625617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019330218,0.00007557529,0.00011272643,0.00009124703,0.00002890874,0.000022666263,0.000051772102,0.00006150734,0.000038741244],"category_scores_gemma":[0.0000148983045,0.0000748589,0.000018407116,0.00014493195,0.0000049308824,0.00017199939,0.00000286379,0.000027287371,0.000021613314],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.741298e-7,0.0000034262146,0.000049324557,0.000057011624,0.0000069347525,3.6082607e-8,0.00003610761,0.98530567,0.0090638185,0.00419462,0.0008023494,0.00048004862],"study_design_scores_gemma":[0.00014319023,0.000022794336,0.000016046044,0.000011695163,0.000006236285,0.0000025555673,0.000012132256,0.94534034,0.054241706,7.553745e-7,0.00013047385,0.00007210918],"about_ca_topic_score_codex":0.0000067226733,"about_ca_topic_score_gemma":0.0000033785996,"teacher_disagreement_score":0.9774202,"about_ca_system_score_codex":0.00007164707,"about_ca_system_score_gemma":0.0000073161814,"threshold_uncertainty_score":0.30526575},"labels":[],"label_agreement":null},{"id":"W1508489305","doi":"10.5772/32649","title":"Hydropower Scheduling in Large Scale Power Systems","year":2012,"lang":"en","type":"book-chapter","venue":"InTech eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Computer science; Scheduling (production processes); Scale (ratio); Environmental science; Electrical engineering; Engineering; Geography; Operations management; Cartography","score_opus":0.008252188108419925,"score_gpt":0.2055462183905543,"score_spread":0.19729403028213438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1508489305","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003340032,0.006611207,0.08214815,0.0000035843054,0.002225673,0.000696652,0.0000292667,0.000744642,0.90720683],"genre_scores_gemma":[0.8311266,0.000055040968,0.00039537705,0.000018752224,0.00016046513,0.00005732519,0.000024884297,0.00029580982,0.1678658],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979439,0.000019977242,0.0007086308,0.00034669982,0.000346894,0.0006339318],"domain_scores_gemma":[0.9990266,0.00004371074,0.00013472677,0.000578068,0.00008486477,0.0001320042],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003890632,0.0005186355,0.000612033,0.0005801735,0.000036949023,0.000068659036,0.00031331572,0.00083155476,0.00020320511],"category_scores_gemma":[0.000013025761,0.00056880305,0.00013784046,0.000041469608,0.00003183655,0.00009653388,0.0000756821,0.00090986054,0.0006345173],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005696954,0.0009660405,0.002889995,0.021388946,0.008657151,0.0031605205,0.044718426,0.15192723,0.20278679,0.50461906,0.021134933,0.037181225],"study_design_scores_gemma":[0.0020809695,0.00019408716,0.000017510145,0.008860901,0.0002340053,0.00038675818,0.00023067702,0.07219076,0.019797428,0.0019611828,0.8892649,0.0047808453],"about_ca_topic_score_codex":0.000011884236,"about_ca_topic_score_gemma":0.000031680232,"teacher_disagreement_score":0.86812997,"about_ca_system_score_codex":0.0005326137,"about_ca_system_score_gemma":0.000042689797,"threshold_uncertainty_score":0.99967635},"labels":[],"label_agreement":null},{"id":"W1508563488","doi":"","title":"Price and Environment in Electricity Restructuring","year":2001,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Restructuring; Electricity; Electricity market; Volatility (finance); Electricity price; Margin (machine learning); Economics; Welfare; Electricity retailing; Spot contract; Harm; Business; Microeconomics; Industrial organization; Monetary economics; Natural resource economics; Market economy; Financial economics; Finance","score_opus":0.012333615832813232,"score_gpt":0.23902266498571592,"score_spread":0.2266890491529027,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1508563488","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92298144,0.0013162756,0.00028065045,0.000064185704,0.00025179476,0.0010930457,0.000008799138,0.00011491827,0.07388889],"genre_scores_gemma":[0.9306661,0.06759696,0.0011033433,0.0000063140224,0.00008683223,0.00016308046,0.000018277235,0.000080777085,0.00027834636],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977761,0.0001432952,0.00054697844,0.0006128288,0.00018608096,0.0007347107],"domain_scores_gemma":[0.99905044,0.00019116272,0.00006661822,0.0005602623,0.000013989689,0.00011754807],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010099068,0.00026706498,0.0004015755,0.0007841226,0.000044725628,0.000085518615,0.00032946,0.0004043421,0.00002509468],"category_scores_gemma":[0.00011308159,0.00033644852,0.000040613002,0.00019432683,0.000055802444,0.000087840766,0.00037713308,0.001600872,0.0000040533746],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001718219,0.000024951856,0.007233583,0.00023445942,0.000032804386,0.00004203989,0.00021552217,0.8893891,0.00020849438,0.00004105048,0.000009232356,0.10255161],"study_design_scores_gemma":[0.0008772699,0.00006557997,0.032713026,0.00033031983,0.000006798888,0.000050191986,0.00008597327,0.9565762,0.0008915471,0.0018648879,0.005677982,0.00086021033],"about_ca_topic_score_codex":0.00007445866,"about_ca_topic_score_gemma":0.00010244477,"teacher_disagreement_score":0.101691395,"about_ca_system_score_codex":0.00241408,"about_ca_system_score_gemma":0.00009932401,"threshold_uncertainty_score":0.99990875},"labels":[],"label_agreement":null},{"id":"W1510196018","doi":"10.1108/17506220911005768","title":"The value of unused interregional transmission","year":2009,"lang":"en","type":"article","venue":"International Journal of Energy Sector Management","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"HEC Montréal","funders":"","keywords":"Electricity; Electric power transmission; Transaction cost; Opportunity cost; Economics; Value (mathematics); Electricity market; Business; Transmission (telecommunications); Originality; Telecommunications; Engineering; Finance; Microeconomics; Computer science","score_opus":0.004458054043563458,"score_gpt":0.20152109981265034,"score_spread":0.1970630457690869,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1510196018","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01497037,0.0019488735,0.95431244,0.0013809453,0.0031074886,0.00008391565,0.0000019307888,0.000052791445,0.024141222],"genre_scores_gemma":[0.9970075,0.0008778468,0.0015924165,0.00008015752,0.00017062023,0.0000012664136,0.0000025805966,0.0000104905075,0.00025715778],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988495,0.000030531894,0.00045683674,0.00005713622,0.0005042849,0.00010168317],"domain_scores_gemma":[0.9994862,0.000045622775,0.0001701425,0.00008714409,0.00017224843,0.00003861027],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001913686,0.00008962165,0.00011086657,0.00021616044,0.0000215746,0.000031795826,0.00046379727,0.00002807594,0.000020182413],"category_scores_gemma":[0.000007285286,0.00006511597,0.00010648343,0.00012509304,0.00001296724,0.00011926417,0.00001220313,0.0000723276,7.920769e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025076568,0.0001544967,0.00007081519,0.00002651539,0.0013609427,0.000114059956,0.00023520617,0.6079475,0.0053639226,0.17293513,0.012096247,0.19944438],"study_design_scores_gemma":[0.0045943367,0.00086882064,0.01079636,0.001350802,0.00019485757,0.00040515183,0.0001871441,0.33995876,0.040457092,0.014396811,0.58612996,0.00065990584],"about_ca_topic_score_codex":0.0000032658374,"about_ca_topic_score_gemma":0.0000017785474,"teacher_disagreement_score":0.98203707,"about_ca_system_score_codex":0.00013290618,"about_ca_system_score_gemma":0.000012631378,"threshold_uncertainty_score":0.26553524},"labels":[],"label_agreement":null},{"id":"W1512647074","doi":"","title":"Explaining time-varying risk of electricity forwards: trading activity and news announcements","year":2010,"lang":"en","type":"preprint","venue":"Econstor (Econstor)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Jump; Volatility (finance); Econometrics; Electricity; Order (exchange); Maturity (psychological); Electricity price; Economics; Quarter (Canadian coin); Financial economics; Engineering; Finance","score_opus":0.009623571617718851,"score_gpt":0.21626299906100113,"score_spread":0.2066394274432823,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1512647074","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9440633,0.0016295403,0.03737255,0.000011993576,0.0023618357,0.0009014579,0.00026005576,0.0005132057,0.012886054],"genre_scores_gemma":[0.9936261,0.0006548739,0.0049957447,0.000011974512,0.00028346776,0.00010744254,0.000067961395,0.0001352348,0.00011716791],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9968749,0.00020449253,0.0009807841,0.0008468255,0.00036713155,0.000725836],"domain_scores_gemma":[0.99755216,0.0004251242,0.00084503123,0.0008043335,0.00012912045,0.00024423288],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00094018935,0.000739156,0.0012505121,0.00070843525,0.00022112892,0.0001305277,0.0004532598,0.00087208685,0.0001859118],"category_scores_gemma":[0.00029916206,0.0008883682,0.00026035012,0.00034660843,0.00013448749,0.00046614071,0.00022939549,0.0019490294,0.00002682857],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013380335,0.00025028604,0.86444956,0.0020773725,0.0025326496,0.000032240536,0.0030072185,0.045440257,0.05549137,0.000106501044,0.0050094025,0.021469366],"study_design_scores_gemma":[0.0019676152,0.00019517855,0.015277237,0.0009308198,0.0006283003,0.00013753703,0.00007234498,0.95517194,0.022018423,0.00031763953,0.0009475235,0.002335432],"about_ca_topic_score_codex":0.00025591013,"about_ca_topic_score_gemma":0.00010174159,"teacher_disagreement_score":0.9097317,"about_ca_system_score_codex":0.00061464484,"about_ca_system_score_gemma":0.00032429252,"threshold_uncertainty_score":0.9993567},"labels":[],"label_agreement":null},{"id":"W151902564","doi":"10.1007/978-1-4419-6123-5_11","title":"Electricity and Environmental Markets","year":2012,"lang":"en","type":"book-chapter","venue":"International series in management science/operations research/International series in operations research & management science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Complementarity (molecular biology); Electricity market; Industrial organization; Environmental economics; Business; Electricity retailing; Electricity system; Electricity generation; Commerce; Economics; Power (physics); Engineering; Electrical engineering","score_opus":0.025223017989756145,"score_gpt":0.3221470764764837,"score_spread":0.2969240584867276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W151902564","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007770397,0.0009115291,0.0023354504,0.0032879498,0.0030036662,0.004434793,0.00019821155,0.000238821,0.9778192],"genre_scores_gemma":[0.67796946,0.029279914,0.008024159,0.0000713174,0.00033519676,0.0012992453,0.00042070908,0.00013258224,0.2824674],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9867417,0.00023302346,0.0013382756,0.0018312886,0.0079096155,0.0019460577],"domain_scores_gemma":[0.99735796,0.00015353577,0.0000617442,0.0011505592,0.00086576614,0.0004104036],"candidate_categories":["metaepi_narrow","bibliometrics","sts","scholarly_communication","insufficient_payload"],"consensus_categories":["sts"],"category_scores_codex":[0.012285741,0.0006377837,0.00043801428,0.011763516,0.0020150272,0.0029568868,0.004704255,0.00022706733,0.0017413243],"category_scores_gemma":[0.00041424055,0.0007065567,0.00008674058,0.0034867527,0.0052160923,0.007755056,0.003258444,0.0016548474,0.00031151602],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013032196,0.0002763512,0.00053597084,0.00014103681,0.00019351458,0.000186641,0.0008450905,0.15072574,0.0014386231,0.83208793,0.001840285,0.011598507],"study_design_scores_gemma":[0.002316003,0.00033286217,0.015880799,0.0013386195,0.00004934336,0.00020131608,0.0042980844,0.6174697,0.0015920867,0.013770793,0.3400594,0.0026909998],"about_ca_topic_score_codex":0.00018492754,"about_ca_topic_score_gemma":0.0014793819,"teacher_disagreement_score":0.8183171,"about_ca_system_score_codex":0.006922122,"about_ca_system_score_gemma":0.0002942371,"threshold_uncertainty_score":0.99953854},"labels":[],"label_agreement":null},{"id":"W1531629538","doi":"10.15173/esr.v13i1.467","title":"Markets for Financial Transmission Rights","year":2004,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Transmission (telecommunications); Business; Finance; Financial market; Hedge; Computer science; Telecommunications","score_opus":0.011857349838113047,"score_gpt":0.24475226322735916,"score_spread":0.23289491338924612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1531629538","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00002480314,0.75102234,0.24403474,0.00025822065,0.00039598453,0.0002518953,0.0000020270797,0.00017155663,0.003838464],"genre_scores_gemma":[0.028739331,0.95912313,0.00994863,0.00055435137,0.00024800526,0.00055599125,0.000022881648,0.000050331833,0.00075734995],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993285,0.000018092616,0.00025547738,0.00013070635,0.000088318804,0.0001789338],"domain_scores_gemma":[0.9997221,0.000037664937,0.000028975268,0.00012022831,0.000056593453,0.00003440974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012686882,0.00013771834,0.0003240042,0.000031621206,0.00008402796,0.000004231259,0.00007649285,0.000038785773,0.00001182771],"category_scores_gemma":[0.000044534787,0.00010903859,0.000089789144,0.00020427183,0.000009847433,0.00005743717,0.0000070234323,0.000034310127,0.00000522702],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026145697,0.0000795565,0.000002351424,0.021561712,0.00056315877,0.00002227748,0.00037735398,0.03723789,0.00012816231,0.033770707,0.24656181,0.65966886],"study_design_scores_gemma":[0.00033833992,0.000029611077,0.000009213122,0.0025543936,0.000060635113,0.00000533343,0.0000010163872,0.0004658656,0.00071031216,0.0011821206,0.9944703,0.00017287694],"about_ca_topic_score_codex":0.0000037357474,"about_ca_topic_score_gemma":0.000012567591,"teacher_disagreement_score":0.7479085,"about_ca_system_score_codex":0.00010694376,"about_ca_system_score_gemma":0.000015178665,"threshold_uncertainty_score":0.44464648},"labels":[],"label_agreement":null},{"id":"W1534852015","doi":"10.1109/pes.2004.1373066","title":"Allocation of transmission capacity in the central America electricity market","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Electricity market; Electricity; Transmission (telecommunications); Common value auction; Electric power transmission; Business; Point (geometry); Industrial organization; Environmental economics; Computer science; Economics; Telecommunications; Microeconomics; Engineering; Electrical engineering","score_opus":0.006406651754228939,"score_gpt":0.1832829415247242,"score_spread":0.17687628977049527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1534852015","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3772364,0.0011767588,0.61903673,0.00012577468,0.0005392631,0.00041966242,0.0000069046932,0.00032141642,0.001137065],"genre_scores_gemma":[0.9769751,0.0002392522,0.022478335,0.00007080505,0.00010596731,0.000035633697,0.000009027785,0.000057125453,0.00002874554],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982296,0.00006127412,0.00048771602,0.00024396987,0.00038219112,0.0005951987],"domain_scores_gemma":[0.9994346,0.00006531066,0.00008442884,0.0002766184,0.00005738674,0.00008166255],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00042842628,0.00028551108,0.0002881364,0.00009304629,0.000050891773,0.00002929204,0.0003078183,0.00017562923,0.000014137207],"category_scores_gemma":[0.000041564985,0.00026178127,0.00019353995,0.00097350875,0.000028269535,0.00014794733,0.0000064388987,0.00035600897,0.0000026172331],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000041541293,0.00004785423,0.0001204476,0.00009869729,0.00003854116,0.0000014108264,0.0024865228,0.9108795,0.083553724,0.000050887866,0.0024526992,0.0002655697],"study_design_scores_gemma":[0.0011192354,0.00011345123,0.005015191,0.00025426308,0.000045029945,0.000025790507,0.00009440657,0.8852258,0.10353666,0.000046124853,0.0038607917,0.00066329446],"about_ca_topic_score_codex":0.0002289717,"about_ca_topic_score_gemma":0.000006969387,"teacher_disagreement_score":0.5997387,"about_ca_system_score_codex":0.000414599,"about_ca_system_score_gemma":0.00004889149,"threshold_uncertainty_score":0.99998343},"labels":[],"label_agreement":null},{"id":"W1536699196","doi":"10.1109/eem.2015.7216641","title":"The evolution of bidding strategies in Spain following the introduction of renewable energy","year":2015,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bidding; Revenue; Quarter (Canadian coin); Renewable energy; Electricity; Agricultural economics; Production (economics); Economics; Order (exchange); Natural resource economics; Business; Microeconomics; Engineering; Finance; Geography","score_opus":0.006662416003210731,"score_gpt":0.19347596928703367,"score_spread":0.18681355328382293,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1536699196","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05441115,0.0027122921,0.9155628,0.00021373892,0.0009297927,0.00014956613,3.7134242e-7,0.000112812966,0.025907451],"genre_scores_gemma":[0.99920577,0.000023929782,0.00043911673,8.234361e-7,0.00006574975,0.0000069639536,0.0000014152855,0.000008283251,0.00024793952],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99942064,0.00006177754,0.0002238975,0.00005831465,0.00012929224,0.000106072686],"domain_scores_gemma":[0.99968714,0.000059225407,0.000043660828,0.0001569847,0.00004183224,0.000011155743],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069035025,0.000052231662,0.00008581719,0.000075809745,0.000023041513,0.000015563097,0.00009361607,0.000032642518,0.0000017655046],"category_scores_gemma":[0.00007804269,0.000032935503,0.000024251285,0.0004675885,0.000012671987,0.00016607996,0.00001012163,0.0000357361,3.6243924e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000037032962,0.000003492182,0.0002337794,0.000008385273,0.000014076892,9.2947204e-8,0.00019566358,0.98235697,0.0051317965,0.010379846,0.0012477561,0.00042445655],"study_design_scores_gemma":[0.00028429547,0.000046551035,0.00022708288,0.000030309608,0.000012982314,0.0000025492827,0.006077424,0.96537226,0.023475645,0.0029733332,0.0014009131,0.0000966673],"about_ca_topic_score_codex":0.0028856166,"about_ca_topic_score_gemma":0.0018802609,"teacher_disagreement_score":0.94479465,"about_ca_system_score_codex":0.00017737735,"about_ca_system_score_gemma":0.000049554677,"threshold_uncertainty_score":0.43622085},"labels":[],"label_agreement":null},{"id":"W1536700515","doi":"10.1109/pes.2005.1489582","title":"An overview of the operation of Ontario's electricity market","year":2005,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2005","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity market; Electricity; Business; Energy market; Industrial organization; Environmental economics; Economics; Engineering; Electrical engineering","score_opus":0.008817326617782364,"score_gpt":0.21843344019962613,"score_spread":0.20961611358184376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1536700515","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9051402,0.0048044957,0.084430836,0.00007707472,0.0014978582,0.00062502787,0.000019543546,0.0004593234,0.0029455991],"genre_scores_gemma":[0.97613204,0.00023956114,0.02263728,0.000052704418,0.00020278351,0.000019875883,0.000005729225,0.00006982155,0.00064023334],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984617,0.000048240992,0.0005438173,0.00021086323,0.0003416807,0.00039366155],"domain_scores_gemma":[0.9992406,0.00003218644,0.00012717445,0.000432801,0.000090168825,0.000077117074],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055656774,0.00025462854,0.0003150837,0.000054258326,0.00004914462,0.000023512837,0.00034189603,0.00016924847,0.00012570033],"category_scores_gemma":[0.000023584353,0.00023350125,0.00023303613,0.00036568395,0.000019011408,0.00023734577,0.000018823594,0.0002551585,0.0000025155987],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000022909069,0.000036800837,0.0005872545,0.000084738385,0.00007135752,9.995336e-8,0.0008898814,0.90165645,0.08971466,0.00006556796,0.006729526,0.00016137432],"study_design_scores_gemma":[0.00028275276,0.000035545367,0.0025740876,0.00009484786,0.00003504096,0.0000053857684,0.000006607454,0.840464,0.14751057,0.0000018983128,0.00872838,0.00026085324],"about_ca_topic_score_codex":0.0005756274,"about_ca_topic_score_gemma":0.00082321896,"teacher_disagreement_score":0.07099177,"about_ca_system_score_codex":0.00059949054,"about_ca_system_score_gemma":0.000119158845,"threshold_uncertainty_score":0.9521905},"labels":[],"label_agreement":null},{"id":"W1544055581","doi":"10.1111/aspp.12118","title":"South Korea's National Energy Plan Six Years On","year":2014,"lang":"en","type":"article","venue":"Asian Politics & Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Korea Energy Economics Institute; Georgia State University","keywords":"Renewable energy; Plan (archaeology); Quarter (Canadian coin); Nuclear power; Fossil fuel; Government (linguistics); Energy (signal processing); Energy policy; Alternative energy; Natural resource economics; Environmental protection; Business; Economic growth; Environmental science; Geography; Economics; Engineering; Waste management; Physics","score_opus":0.005975991571961703,"score_gpt":0.20715508450300363,"score_spread":0.20117909293104191,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1544055581","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020046905,0.000033101613,0.029373875,0.00078287337,0.0005485172,0.00013851827,0.000099249206,0.0007963242,0.9481806],"genre_scores_gemma":[0.99653506,0.000003433019,0.0003321179,0.0006815593,0.0011496012,0.00001123404,0.00005523186,0.00006052771,0.0011712435],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988976,0.00003782609,0.00020288295,0.00015023955,0.00027975926,0.00043167477],"domain_scores_gemma":[0.99949366,0.000050452534,0.000035873178,0.00021921408,0.00004441197,0.00015638901],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006857743,0.00015542691,0.00014123226,0.00036428886,0.000044838693,0.00004239617,0.0001638164,0.00010938012,0.00001336259],"category_scores_gemma":[0.00012081186,0.00018013004,0.000048016882,0.0002626545,0.000022522709,0.000055585933,0.000014686508,0.000103961764,0.00017915505],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013346894,0.000014941677,0.00016874506,0.0000150731485,0.000033418408,0.0000020778145,0.000998631,0.009554919,0.00003649501,0.9814006,0.0058088982,0.001964852],"study_design_scores_gemma":[0.0037826726,0.00069204776,0.033787336,0.00023836915,0.00009706461,0.0001739171,0.0005182824,0.34487468,0.0052527017,0.08790426,0.51953435,0.003144305],"about_ca_topic_score_codex":0.00012600799,"about_ca_topic_score_gemma":0.0000114872055,"teacher_disagreement_score":0.9764882,"about_ca_system_score_codex":0.00027281657,"about_ca_system_score_gemma":0.00009084337,"threshold_uncertainty_score":0.734549},"labels":[],"label_agreement":null},{"id":"W1545140710","doi":"10.7202/602357ar","title":"Électricité en Afrique et performance productive","year":2009,"lang":"fr","type":"article","venue":"L Actualité économique","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Political science; Welfare economics; Economy; Humanities; Economics; Art","score_opus":0.011393846900244043,"score_gpt":0.21751302452272225,"score_spread":0.20611917762247822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1545140710","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72953105,0.010014875,0.12408133,0.03220391,0.0038906487,0.002514014,0.00006112028,0.0013414741,0.09636158],"genre_scores_gemma":[0.97770834,0.002168754,0.0073429705,0.00083907234,0.0007880965,0.000066619235,0.000034220848,0.00009124151,0.01096068],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974984,0.0003887479,0.00066869234,0.0005804395,0.00009586041,0.0007678841],"domain_scores_gemma":[0.9986702,0.0002644682,0.00017475788,0.00058594235,0.00012313711,0.00018145847],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00091528666,0.0004978052,0.00053429295,0.00024984303,0.000085870655,0.00013370911,0.00034681926,0.0004949898,0.00017920033],"category_scores_gemma":[0.00024052373,0.0005870998,0.00012839802,0.00056260993,0.000035916044,0.0010894174,0.000032062402,0.0007030721,0.00036064332],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015762822,0.0005224562,0.00087104976,0.00089215464,0.0004690286,0.000040387386,0.02483463,0.39146754,0.0074748965,0.35000825,0.011895429,0.21136653],"study_design_scores_gemma":[0.0029188327,0.002574905,0.03551465,0.0013625581,0.00028107333,0.0007380229,0.00030700208,0.45369902,0.2239359,0.020349093,0.25407103,0.0042479094],"about_ca_topic_score_codex":0.00016509995,"about_ca_topic_score_gemma":0.000033461518,"teacher_disagreement_score":0.32965916,"about_ca_system_score_codex":0.001211464,"about_ca_system_score_gemma":0.0002518053,"threshold_uncertainty_score":0.99965805},"labels":[],"label_agreement":null},{"id":"W1549726720","doi":"10.1002/etep.153","title":"Assessing mid‐continent area power pool capacity adequacy including transmission limitations","year":2007,"lang":"en","type":"article","venue":"European Transactions on Electrical Power","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Manitoba Hydro","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Electric power system; Environmental science; Transmission (telecommunications); Margin (machine learning); Transmission system; Computer science; Power (physics); Engineering; Telecommunications","score_opus":0.04045538329922824,"score_gpt":0.24903932051741332,"score_spread":0.20858393721818508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1549726720","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022714648,0.00024242193,0.9060776,0.00017882333,0.00049787556,0.00046988085,0.000005226854,0.0010716404,0.068741865],"genre_scores_gemma":[0.99491185,0.00007393215,0.0042740884,0.0001568389,0.000057216574,0.000016379608,0.00001258091,0.00016899811,0.0003281081],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99708104,0.00024046956,0.0008169695,0.00048858416,0.0005215849,0.0008513322],"domain_scores_gemma":[0.99857295,0.000431866,0.000102712685,0.00039522993,0.00014147913,0.00035573982],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008721106,0.00043688234,0.00034810396,0.00069696136,0.00042904896,0.0001946393,0.00028962473,0.00015933845,0.00022960608],"category_scores_gemma":[0.00007191908,0.00044580086,0.00024769513,0.0015721712,0.000042228854,0.00064659264,0.0000036277584,0.0009401711,0.00020450485],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038962357,0.0027740882,0.00019743876,0.00015986897,0.00085743127,0.00042567996,0.0064293463,0.38377205,0.24649128,0.0012312847,0.006221962,0.35104996],"study_design_scores_gemma":[0.0106476,0.0033894044,0.037149355,0.0017489077,0.0009021217,0.0007335233,0.0009770528,0.36383006,0.33796877,0.00038334998,0.23383537,0.008434477],"about_ca_topic_score_codex":0.000004835293,"about_ca_topic_score_gemma":0.00000462642,"teacher_disagreement_score":0.97219723,"about_ca_system_score_codex":0.00046309995,"about_ca_system_score_gemma":0.00003687917,"threshold_uncertainty_score":0.9997994},"labels":[],"label_agreement":null},{"id":"W1551178689","doi":"10.1109/naps.2005.1560584","title":"Generation expansion under risk using stochastic programming","year":2005,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Randomness; Stochastic programming; Computer science; Mathematical optimization; Stochastic modelling; Stochastic process; Stochastic optimization; Value (mathematics); Work (physics); Expected value; Mathematics; Engineering; Statistics","score_opus":0.023691392891997096,"score_gpt":0.23718446932323,"score_spread":0.21349307643123291,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1551178689","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16584717,0.000213236,0.8328815,0.000009533142,0.00017328662,0.00015641475,3.5360242e-7,0.00038214066,0.00033633632],"genre_scores_gemma":[0.93172705,0.0000062966196,0.06789373,0.000010700701,0.00023933758,0.00000938587,0.0000074587097,0.00002762934,0.00007842942],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994165,0.000019013316,0.00016700431,0.000110352834,0.00011432641,0.00017281025],"domain_scores_gemma":[0.9997764,0.000012545473,0.000025857425,0.000116787356,0.000029903309,0.000038469007],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010134862,0.00009326409,0.00007599225,0.00008280973,0.000066291635,0.000043124568,0.000039971204,0.000056948127,0.000035760047],"category_scores_gemma":[0.000011405023,0.00009222349,0.000021043194,0.00018890921,0.000004356707,0.00021017878,0.000006566938,0.00006959937,0.000032131782],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[4.630005e-7,0.000006117648,0.000016075366,0.0000041281783,0.000008894211,1.7105091e-7,0.00007120277,0.9737689,0.008049648,0.00008479914,0.00011483305,0.017874798],"study_design_scores_gemma":[0.00012241861,0.000009170152,0.000024002462,0.0000081973385,0.000014752121,0.000008981244,0.00001850301,0.9959965,0.003541059,0.0000067533833,0.00013614734,0.00011352601],"about_ca_topic_score_codex":0.000020655696,"about_ca_topic_score_gemma":0.0000381682,"teacher_disagreement_score":0.76587987,"about_ca_system_score_codex":0.00016674984,"about_ca_system_score_gemma":0.000011928813,"threshold_uncertainty_score":0.37607646},"labels":[],"label_agreement":null},{"id":"W1552630275","doi":"10.1023/a:1023307319633","title":"An Oligopolistic Investment Model of the Finnish Electricity Market","year":2003,"lang":"en","type":"article","venue":"Annals of Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":74,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Oligopoly; Economics; Microeconomics; Investment (military); Electricity market; Mixed complementarity problem; Production (economics); Stochastic programming; Market power; Complementarity (molecular biology); Industrial organization; Electricity; Mathematical optimization; Cournot competition; Mathematics; Engineering","score_opus":0.12556702748705448,"score_gpt":0.37780454528509755,"score_spread":0.25223751779804304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1552630275","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.74611694,0.0013952677,0.093455285,0.0005384859,0.00017246,0.0016313222,0.0000890156,0.000109816625,0.1564914],"genre_scores_gemma":[0.9975349,0.00017459894,0.001437196,0.00004586382,0.000010451645,0.000044623535,0.0000043493346,0.00001678867,0.00073123956],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985654,0.00034039625,0.00028018156,0.000114506154,0.0004298906,0.00026964926],"domain_scores_gemma":[0.9988033,0.00007013919,0.0000149621055,0.00045113682,0.00059735694,0.00006311165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011273263,0.00007492432,0.00012490306,0.00019493402,0.00013034519,0.000032652948,0.0002754274,0.00005793477,0.0000670331],"category_scores_gemma":[0.00046718415,0.00006177615,0.000037329784,0.00087442744,0.000067804925,0.00016240007,0.00001683147,0.00017832333,0.0000038232165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000027726162,0.00007340722,0.00011496417,0.000036336638,0.000020936552,1.3676582e-7,0.00018079359,0.955979,0.010194805,0.023842005,0.009482115,0.00007276621],"study_design_scores_gemma":[0.00007192756,0.000055185486,0.00025667873,0.00001572469,0.0000028183258,0.0000010848025,0.000020327107,0.8998146,0.098860174,0.000682366,0.00016301834,0.00005606518],"about_ca_topic_score_codex":0.000086918604,"about_ca_topic_score_gemma":0.000056100675,"teacher_disagreement_score":0.25141793,"about_ca_system_score_codex":0.000040014515,"about_ca_system_score_gemma":0.00021118687,"threshold_uncertainty_score":0.2519158},"labels":[],"label_agreement":null},{"id":"W1571928647","doi":"10.1109/melcon.2006.1653251","title":"Financial Transmission Rights in Electricity Markets (Invited Paper)","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Bidding; Computer science; Electricity market; Electricity; Transmission (telecommunications); Finance; Business; Telecommunications; Electrical engineering","score_opus":0.0018377560369239702,"score_gpt":0.1569943969041148,"score_spread":0.15515664086719083,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1571928647","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40269834,0.00095534715,0.45772493,0.00018059147,0.00032172026,0.0006081588,0.0000023363368,0.0011869731,0.1363216],"genre_scores_gemma":[0.9977657,0.00001822813,0.0016622086,0.000045407854,0.000053001553,0.00001349547,0.000014058211,0.0000147355295,0.0004131203],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991577,0.00003407391,0.00026270942,0.00014281558,0.0001305748,0.00027210618],"domain_scores_gemma":[0.99980205,0.000032607033,0.000014846146,0.000106180945,0.000017182947,0.00002710379],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011879692,0.0001266009,0.00014068055,0.00018750124,0.00003205854,0.000015959151,0.00008010265,0.0001224248,0.00011441966],"category_scores_gemma":[0.0000075343683,0.00011606411,0.000032334694,0.0006932912,0.0000044663307,0.00015271321,0.0000030172673,0.00011879553,0.000016499505],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002774609,0.000749504,0.008946966,0.0004892102,0.000051692918,0.00024721888,0.00037765325,0.4203913,0.18478689,0.019404659,0.30640668,0.057870764],"study_design_scores_gemma":[0.0015794323,0.00005118642,0.059282955,0.00007664694,0.000012288325,0.000018080611,9.520427e-7,0.80257577,0.05660635,0.0030426357,0.07611393,0.0006397507],"about_ca_topic_score_codex":0.00030959607,"about_ca_topic_score_gemma":0.00034006272,"teacher_disagreement_score":0.5950674,"about_ca_system_score_codex":0.00012084932,"about_ca_system_score_gemma":0.000010608839,"threshold_uncertainty_score":0.47329572},"labels":[],"label_agreement":null},{"id":"W1574292650","doi":"","title":"Electricity Trade Patterns in a Network: Evidence from the Ontario Market","year":2011,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity market; Economics; Production (economics); Electricity price; International economics; Business; Industrial organization; Microeconomics","score_opus":0.0358368965058377,"score_gpt":0.2570452092713632,"score_spread":0.2212083127655255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1574292650","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92688954,0.0025662032,0.0008024786,0.00020824792,0.0013702064,0.002512795,0.000048199894,0.00020427641,0.06539805],"genre_scores_gemma":[0.98207754,0.01616491,0.00050977094,0.00003622686,0.00027935556,0.00037654807,0.000040380528,0.000094171875,0.00042111945],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99661654,0.0005303548,0.0007852584,0.0007438372,0.00025617055,0.001067824],"domain_scores_gemma":[0.9972814,0.0012842097,0.000120871715,0.0011689387,0.000029530436,0.000115050076],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.002608055,0.00036279368,0.00055466854,0.00027999748,0.00007206575,0.00014560012,0.0011976851,0.0005296093,0.0002604416],"category_scores_gemma":[0.00026680445,0.0003563813,0.00012591026,0.00028296313,0.000054077376,0.00015259333,0.00044894367,0.0032267338,0.000006787404],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000119761105,0.00006301522,0.34155592,0.00015555181,0.000178954,0.000054975648,0.0034833772,0.5974564,0.000023258119,0.000018738943,0.0010213514,0.055868726],"study_design_scores_gemma":[0.0005321677,0.00006608463,0.52121264,0.0018151007,0.000020415802,0.000009433472,0.00008891325,0.47111964,0.00013642652,0.0009650723,0.0032156177,0.000818498],"about_ca_topic_score_codex":0.027151646,"about_ca_topic_score_gemma":0.27232572,"teacher_disagreement_score":0.24517408,"about_ca_system_score_codex":0.0040531787,"about_ca_system_score_gemma":0.0005298034,"threshold_uncertainty_score":0.99988884},"labels":[],"label_agreement":null},{"id":"W1576454826","doi":"10.1109/pes.2005.1489552","title":"Complementarity-based models for financial transmission rights","year":2005,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2005","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Consejo Nacional de Ciencia y Tecnología","keywords":"Complementarity (molecular biology); Computer science; Mathematical optimization; Financial market; Microeconomics; Economics; Econometrics; Finance; Mathematics","score_opus":0.007900170734737802,"score_gpt":0.20831189783758042,"score_spread":0.2004117271028426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1576454826","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017863328,0.00044044974,0.9781245,0.00021601806,0.0009612178,0.00059253734,0.000047278634,0.0009567977,0.00079784903],"genre_scores_gemma":[0.6735826,0.000032730157,0.32416528,0.0005116672,0.00096799753,0.00020106621,0.00008204506,0.00016069629,0.00029589483],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980908,0.000019000974,0.0004637013,0.00035513227,0.00031731516,0.0007540234],"domain_scores_gemma":[0.99935275,0.00008553174,0.000055571032,0.00026291405,0.00006419224,0.00017905784],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037178473,0.0004005645,0.0003204505,0.00009331556,0.00016086578,0.00005287002,0.00023574641,0.00021747964,0.000040250543],"category_scores_gemma":[0.000009703175,0.00042777756,0.0003273361,0.00020608986,0.00001367236,0.0001850692,0.000006782912,0.00025716476,0.000014078708],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009210521,0.000043320477,0.0000026892492,0.00007577982,0.000041312385,4.990708e-7,0.0002429309,0.9311995,0.007563838,0.0004159656,0.060056407,0.00034856622],"study_design_scores_gemma":[0.00093271123,0.00005177557,0.000006144549,0.00008358062,0.000022032367,0.000001492765,0.0000017847818,0.82615656,0.034555074,0.000033590597,0.13774383,0.00041141463],"about_ca_topic_score_codex":0.000015760586,"about_ca_topic_score_gemma":0.000010750033,"teacher_disagreement_score":0.6557193,"about_ca_system_score_codex":0.00040072904,"about_ca_system_score_gemma":0.00004343688,"threshold_uncertainty_score":0.99981743},"labels":[],"label_agreement":null},{"id":"W1602087588","doi":"10.1109/pes.2003.1270417","title":"Congestion rents allocation based on transmission usage","year":2004,"lang":"en","type":"article","venue":"2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Clearance; Economic rent; Node (physics); Computer science; Mathematical optimization; Transmission (telecommunications); Transmission system; Outcome (game theory); Distribution (mathematics); Optimal allocation; Economics; Telecommunications; Microeconomics; Mathematics; Engineering","score_opus":0.0056318785579263005,"score_gpt":0.19526021425172096,"score_spread":0.18962833569379467,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1602087588","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20497604,0.00025933824,0.7843282,0.00014782914,0.0060292203,0.0008428715,0.000020301615,0.0019601798,0.0014359776],"genre_scores_gemma":[0.8498842,0.00026473647,0.14771597,0.00031828778,0.0006783346,0.00016840102,0.00014025434,0.00034559207,0.00048419632],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9967763,0.0000793154,0.000766741,0.0006852997,0.0007407,0.0009516759],"domain_scores_gemma":[0.9984718,0.00009851272,0.00014281464,0.0005982868,0.000365878,0.00032272434],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00076498743,0.0007140891,0.0004930732,0.00021240035,0.0002078536,0.00012861466,0.00037353983,0.0005046129,0.000029885583],"category_scores_gemma":[0.00015792306,0.00080414733,0.00028848165,0.0011773815,0.00003473197,0.0003170744,0.000011185601,0.0005309093,0.00014017569],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009927753,0.000060227783,0.000032849886,0.00016850056,0.000062556064,0.000004872141,0.00040892002,0.78695685,0.2078962,0.000027097656,0.004076114,0.00029590412],"study_design_scores_gemma":[0.001358691,0.00013487322,0.00015739082,0.0005916573,0.000055093857,0.0000102060785,0.000014465015,0.9200931,0.07398687,0.000005008009,0.0027690893,0.000823523],"about_ca_topic_score_codex":0.000047857833,"about_ca_topic_score_gemma":0.0000020841237,"teacher_disagreement_score":0.6449082,"about_ca_system_score_codex":0.0012332358,"about_ca_system_score_gemma":0.00018012231,"threshold_uncertainty_score":0.99944097},"labels":[],"label_agreement":null},{"id":"W160608422","doi":"10.1007/0-306-47663-0_10","title":"An Interior-Point/Cutting-Plane Algorithm to Solve the Dual Unit Commitment Problem — on Dual Variables, Duality Gap, and Cost Recovery","year":2005,"lang":"en","type":"book-chapter","venue":"Kluwer Academic Publishers eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"University of Waterloo; Consejo Nacional de Ciencia y Tecnología","keywords":"Duality gap; Dual (grammatical number); Duality (order theory); Mathematical optimization; Convergence (economics); Cutting-plane method; Differentiable function; Bundle; Strong duality; Point (geometry); Mathematics; Plane (geometry); Computer science; Algorithm; Optimization problem; Mathematical analysis; Geometry; Pure mathematics; Economics","score_opus":0.020120501235974014,"score_gpt":0.23653636906287745,"score_spread":0.21641586782690345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W160608422","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00013596746,0.0007914308,0.024112077,0.00076623133,0.0021287508,0.004310651,0.00058792357,0.0012350555,0.9659319],"genre_scores_gemma":[0.013448603,0.0007533971,0.041623224,0.011339889,0.009781284,0.0023844002,0.0046632937,0.002842647,0.91316324],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99559385,0.00014139219,0.0013544849,0.0010411809,0.00087617507,0.0009929191],"domain_scores_gemma":[0.9973741,0.00034478994,0.00041717762,0.0010966915,0.00020663523,0.00056057225],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["research_integrity"],"category_scores_codex":[0.0020232177,0.0010750649,0.00093660183,0.0005778011,0.0002569285,0.00086301274,0.00084209867,0.0015258673,0.00021012673],"category_scores_gemma":[0.00007816571,0.00096672063,0.00014310602,0.00011621454,0.00014724715,0.0008705831,0.00027314646,0.0033179466,0.00008021201],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023791142,0.000054296524,0.00002760926,0.00048438887,0.0015403486,0.00011508984,0.0039597936,0.009995827,0.00029147137,0.024851833,0.6940184,0.26442298],"study_design_scores_gemma":[0.0013611764,0.00060650194,0.000019797004,0.0012551422,0.00032528414,0.00040518522,0.00015684294,0.0073859887,0.00021914796,0.004260657,0.98202693,0.0019773196],"about_ca_topic_score_codex":0.00007638386,"about_ca_topic_score_gemma":0.00006853725,"teacher_disagreement_score":0.2880085,"about_ca_system_score_codex":0.0009248553,"about_ca_system_score_gemma":0.00020337926,"threshold_uncertainty_score":0.99977034},"labels":[],"label_agreement":null},{"id":"W1606128843","doi":"10.22004/ag.econ.59701","title":"Managing Water Shortages in the Western Electricity Grids","year":2010,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydroelectricity; Electricity; Wind power; Environmental science; Renewable energy; Tonne; Fossil fuel; Pumped-storage hydroelectricity; Variable renewable energy; Natural resource economics; Economic shortage; Water resource management; Energy storage; Economics; Engineering; Distributed generation; Waste management","score_opus":0.01525398814890787,"score_gpt":0.2671587913304352,"score_spread":0.2519048031815273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1606128843","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.895881,0.0003867876,0.0003682343,0.0006017145,0.001134527,0.0017848258,0.000013949365,0.00022592659,0.099603035],"genre_scores_gemma":[0.9928383,0.005743755,0.00017390154,0.00004504641,0.00022434564,0.0003439462,0.0000621121,0.00009580197,0.00047278212],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971971,0.0002949281,0.0006274346,0.00058234023,0.0002822625,0.0010159399],"domain_scores_gemma":[0.99852973,0.00026899157,0.000047291996,0.0010325954,0.000046900703,0.000074498734],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0030205897,0.00032332598,0.00043471117,0.00082809496,0.000079260804,0.00026059547,0.001117607,0.0005382191,0.000021751726],"category_scores_gemma":[0.00007497584,0.00026296393,0.00009599264,0.00022406358,0.000068325884,0.00012630459,0.00037610612,0.003690875,0.000017679336],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030863263,0.00009916831,0.02126244,0.0006042695,0.00012022208,0.00012960106,0.0027184053,0.8582118,0.0011050192,0.00009247237,0.00017659618,0.115449116],"study_design_scores_gemma":[0.000914701,0.00009947837,0.015053208,0.00042524986,0.000023651623,0.00007033858,0.00036149952,0.9532179,0.0052771517,0.00177185,0.021256622,0.0015283454],"about_ca_topic_score_codex":0.00011785968,"about_ca_topic_score_gemma":0.0011523967,"teacher_disagreement_score":0.11392077,"about_ca_system_score_codex":0.0008057534,"about_ca_system_score_gemma":0.00009294669,"threshold_uncertainty_score":0.99998224},"labels":[],"label_agreement":null},{"id":"W166553738","doi":"10.2316/journal.203.2009.3.203-3590","title":"GENERATOR BIDDING STRATEGIES IN A COMPETITIVE ELECTRICITY MARKET WITH DERATING AND BID-SEGMENT CONSIDERATIONS","year":2009,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bidding; Electricity market; Profit (economics); Market clearing; Electricity; Generator (circuit theory); Microeconomics; Perfect competition; Economics; Electrical engineering; Engineering","score_opus":0.0044065185804632555,"score_gpt":0.2026753780731858,"score_spread":0.19826885949272255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W166553738","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5831322,0.010411292,0.3699562,0.0005549328,0.0021033385,0.00020687409,0.000017149243,0.000108441396,0.033509556],"genre_scores_gemma":[0.9986595,0.00023618454,0.00089284853,0.000051654068,0.0001131984,0.0000030988344,0.0000015911678,0.000009527351,0.000032420077],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991066,0.000057356294,0.00039125225,0.00009039988,0.00023243029,0.000121962046],"domain_scores_gemma":[0.9994869,0.00008254833,0.00012330597,0.000038566202,0.000212356,0.00005631514],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020883327,0.000115344264,0.00019186096,0.0002968606,0.000036610723,0.0002631209,0.000055330205,0.00004345474,0.0000089184605],"category_scores_gemma":[0.000022096641,0.000097730765,0.000018100718,0.000105955194,0.000013726163,0.0003480774,0.0000061723986,0.00010111689,1.15139365e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021135726,0.00017503316,0.0071915323,0.000071987255,0.0009683209,0.00081854535,0.0039780126,0.79162264,0.019640984,0.1690256,0.00254643,0.0037495687],"study_design_scores_gemma":[0.00599077,0.0015384986,0.02034916,0.002169045,0.00009169931,0.009465282,0.004866229,0.9435538,0.0048367023,0.0016505198,0.0042800754,0.0012082357],"about_ca_topic_score_codex":0.000043265984,"about_ca_topic_score_gemma":0.000048066817,"teacher_disagreement_score":0.41552725,"about_ca_system_score_codex":0.00011572322,"about_ca_system_score_gemma":0.000058417456,"threshold_uncertainty_score":0.3985345},"labels":[],"label_agreement":null},{"id":"W170944168","doi":"10.15173/esr.v15i1.504","title":"Empirical Assessment of Market Power in the Alberta Wholesale Electricity Market","year":2007,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Market power; Price elasticity of demand; Margin (machine learning); Economics; Marginal cost; Microeconomics; Electricity; Electricity market; Lerner index; Sample (material); Industrial organization; Business","score_opus":0.01813228344376835,"score_gpt":0.313628202834778,"score_spread":0.29549591939100966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W170944168","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008563664,0.60908574,0.015293106,0.000678735,0.00034624583,0.00047838967,0.0000021615278,0.000069348855,0.3731899],"genre_scores_gemma":[0.62584245,0.37003142,0.0009043247,0.0013042388,0.000060302387,0.00011801475,0.0000063677394,0.00004436778,0.0016885072],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983468,0.00024640502,0.00062223745,0.00017557997,0.0002934832,0.00031550933],"domain_scores_gemma":[0.99876654,0.00069952593,0.000098212644,0.00033135296,0.000074593816,0.00002975769],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018519982,0.00018824318,0.0005267696,0.0000988762,0.000035186287,0.000006670447,0.00023904284,0.000053127038,0.00011151469],"category_scores_gemma":[0.00023118005,0.00013106734,0.000093732524,0.0010612018,0.000027424336,0.000060734255,0.000039009214,0.00014499776,0.0000018400078],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018889028,0.00026306818,0.014029161,0.0052564107,0.00074282504,0.00004825138,0.0006443918,0.0015423339,0.00003456561,0.002313333,0.94519514,0.029911604],"study_design_scores_gemma":[0.00052686647,0.00015809358,0.058152605,0.0028201626,0.00016434069,0.000043993998,0.00015807137,0.0068553714,0.00011136066,0.00006598842,0.9303745,0.0005686511],"about_ca_topic_score_codex":0.00004277455,"about_ca_topic_score_gemma":0.00044566637,"teacher_disagreement_score":0.6249861,"about_ca_system_score_codex":0.00017675113,"about_ca_system_score_gemma":0.000022562917,"threshold_uncertainty_score":0.5344771},"labels":[],"label_agreement":null},{"id":"W1721191018","doi":"10.1007/978-3-642-23193-3_2","title":"Optimization-Based Bidding in Day-Ahead Electricity Auction Markets: A Review of Models for Power Producers","year":2011,"lang":"en","type":"review","venue":"Energy systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Bidding; Mathematical optimization; Competition (biology); Linear programming; Integer programming; Computer science; Electricity; Schedule; Power system simulation; Stochastic programming; Operations research; Microeconomics; Real-time bidding; Electricity market; Economics; Power (physics); Electric power system; Mathematics; Engineering","score_opus":0.024619086735385612,"score_gpt":0.2457129667967158,"score_spread":0.22109388006133018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1721191018","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[1.3057587e-8,0.5704158,0.4255424,0.0000013556539,0.0008016309,0.0013750243,0.000026208672,0.000141238,0.0016963097],"genre_scores_gemma":[0.00017363962,0.99560744,0.0012920848,0.000009208157,0.00012536702,0.0019658164,0.0003925625,0.00022138539,0.00021250777],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99627024,0.00048703424,0.0019078961,0.0005643049,0.00029210193,0.0004784212],"domain_scores_gemma":[0.9979556,0.00025750152,0.0007769102,0.0006720734,0.0002555055,0.000082376224],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0014752673,0.0005999174,0.002354256,0.00096216524,0.000038893126,0.00002978704,0.00037692804,0.00047499852,0.000020098396],"category_scores_gemma":[0.00020405726,0.0005797264,0.00039875705,0.0018761326,0.000015108452,0.0002327263,0.00001641341,0.00021884301,0.0000020287039],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003867712,0.000027561287,1.6895562e-7,0.14729725,0.0001333715,9.480455e-7,0.000018506424,0.8291582,1.5653588e-7,0.00032885137,0.0014459621,0.021585165],"study_design_scores_gemma":[0.00016001756,0.00003351032,2.5085741e-8,0.112462685,0.00022129485,0.0000102858385,0.0000015735657,0.62068015,0.0000033935341,0.000003110154,0.2660135,0.0004104564],"about_ca_topic_score_codex":0.0001218388,"about_ca_topic_score_gemma":0.0000056945796,"teacher_disagreement_score":0.4251916,"about_ca_system_score_codex":0.0008836979,"about_ca_system_score_gemma":0.00034375276,"threshold_uncertainty_score":0.99966544},"labels":[],"label_agreement":null},{"id":"W1725922051","doi":"","title":"El poder de mercado bajo el nuevo diseño del Pool eléctrico Español","year":2009,"lang":"es","type":"article","venue":"El Repositorio Institucional de la Universidad EAFIT (Universidad EAFIT)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Decree; Quarter (Canadian coin); Electricity market; Order (exchange); Market power; Economics; Electricity; Humanities; Economy; Welfare economics; Business; Geography; Market economy; Engineering; Finance; Art; Electrical engineering","score_opus":0.003661605954150395,"score_gpt":0.22033446316826946,"score_spread":0.21667285721411908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1725922051","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.552986,0.0062080994,0.14234468,0.0028375362,0.005883138,0.002358773,0.0003100947,0.0025279718,0.2845437],"genre_scores_gemma":[0.98659486,0.001313886,0.0047322996,0.00031248276,0.0016444421,0.000010851124,0.0001579544,0.00022646671,0.00500674],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99282855,0.0006489512,0.0010505426,0.0016513107,0.0015906735,0.0022299762],"domain_scores_gemma":[0.9954317,0.0005505112,0.00065812515,0.0014674737,0.00057765446,0.0013144914],"candidate_categories":["metaepi_narrow","sts","research_integrity"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.0008002801,0.0014903718,0.0012658772,0.0020112642,0.0013071306,0.00072625134,0.0018373685,0.0017440808,0.00026393865],"category_scores_gemma":[0.00025835636,0.0019526777,0.00082558306,0.0029125346,0.00029341076,0.0025382622,0.0002907465,0.0019402938,0.000384238],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015646184,0.0014616612,0.019918445,0.00073551893,0.0026529836,0.009244641,0.0060260836,0.3913363,0.03349044,0.49771044,0.025601985,0.010256896],"study_design_scores_gemma":[0.01777278,0.0022856537,0.28036183,0.0036371155,0.0045516235,0.0052248472,0.003319747,0.33370003,0.010076754,0.0038061799,0.325537,0.009726446],"about_ca_topic_score_codex":0.0009790473,"about_ca_topic_score_gemma":0.00003554284,"teacher_disagreement_score":0.49390423,"about_ca_system_score_codex":0.006763182,"about_ca_system_score_gemma":0.0017482375,"threshold_uncertainty_score":0.999993},"labels":[],"label_agreement":null},{"id":"W1751048546","doi":"10.7202/701620ar","title":"L’Hydro-électricité du Québec : Produire pour consommer ou produire pour exporter?","year":2005,"lang":"en","type":"article","venue":"Études internationales","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Université Laval","funders":"","keywords":"Exportation; Impossibility; Production (economics); Electricity; Consumption (sociology); Economics; Welfare economics; Economic surplus; Economy; Humanities; Microeconomics; Political science; Computer science; Sociology; Market economy; Engineering; Welfare; Social science; Art","score_opus":0.011105924511616558,"score_gpt":0.21688444573727494,"score_spread":0.20577852122565837,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1751048546","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7867481,0.009510537,0.06388159,0.018865326,0.0014210282,0.0015465302,0.00004696405,0.0027261174,0.11525382],"genre_scores_gemma":[0.9899496,0.00013622352,0.0023887735,0.00027054868,0.00073764,0.000118993215,0.000037319245,0.000078639096,0.006282258],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984615,0.00003289426,0.00047695255,0.000339269,0.0003771574,0.00031224202],"domain_scores_gemma":[0.99919564,0.000110735375,0.000112901085,0.000288288,0.00021201822,0.000080422185],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017933549,0.00027412968,0.00022724214,0.00025718915,0.000068229754,0.00007411681,0.00039025172,0.00008345958,0.0003198916],"category_scores_gemma":[0.00017572382,0.0002766909,0.0000897149,0.00025267876,0.00003079886,0.00037860693,0.00004306632,0.0001718906,0.0004673554],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010531588,0.0012272309,0.08780706,0.00041441148,0.0019417854,0.00013065516,0.0031629377,0.27652797,0.01748104,0.053699795,0.4322347,0.12526709],"study_design_scores_gemma":[0.0015903397,0.00008591123,0.01325862,0.00024304277,0.000085588545,0.00034560857,0.000097206466,0.5520577,0.027487375,0.000113431306,0.4034693,0.0011658841],"about_ca_topic_score_codex":0.0003927276,"about_ca_topic_score_gemma":0.0023996634,"teacher_disagreement_score":0.2755297,"about_ca_system_score_codex":0.0006388105,"about_ca_system_score_gemma":0.00024227619,"threshold_uncertainty_score":0.9999685},"labels":[],"label_agreement":null},{"id":"W1777904611","doi":"","title":"Simulations de séries temporelles dans les réseaux électriques: applications au stockage thermique pour l'équilibrage de la production éolienne","year":2011,"lang":"fr","type":"article","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Physics; Political science; Art","score_opus":0.011340128972764218,"score_gpt":0.22324876435367322,"score_spread":0.211908635380909,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1777904611","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.088210344,0.0050504757,0.89263654,0.0020482752,0.00021412634,0.0023024052,0.00013276948,0.0020387727,0.0073663206],"genre_scores_gemma":[0.823114,0.0010537745,0.16953892,0.000102009115,0.0005328051,0.00177097,0.00008109915,0.00028630678,0.0035201677],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99538606,0.00107988,0.000962441,0.0007697841,0.00032049575,0.0014813453],"domain_scores_gemma":[0.9971182,0.00044148447,0.00040749356,0.00130261,0.00023097923,0.0004992624],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0016322966,0.00073716714,0.00056067685,0.0007442333,0.0006517732,0.00023373787,0.000743668,0.0010604691,0.00012085442],"category_scores_gemma":[0.0004953827,0.0008851565,0.00026735352,0.0014583773,0.00029828073,0.00084441446,0.00013778596,0.0010585781,0.000030046152],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000082639104,0.0011711688,0.08680115,0.00063505577,0.0003746061,0.000068252724,0.020019101,0.6750441,0.09708556,0.10202143,0.003884694,0.012812252],"study_design_scores_gemma":[0.0005244913,0.00017694874,0.029259993,0.0003400941,0.00025739506,0.0005740656,0.0009880447,0.78616494,0.15815826,0.018203013,0.0041681402,0.0011846405],"about_ca_topic_score_codex":0.03425498,"about_ca_topic_score_gemma":0.012675976,"teacher_disagreement_score":0.73490363,"about_ca_system_score_codex":0.004252012,"about_ca_system_score_gemma":0.0014822071,"threshold_uncertainty_score":0.9995705},"labels":[],"label_agreement":null},{"id":"W1804491171","doi":"","title":"Risk-sensitive investment in renewable distributed generation under uncertainty due to post-feed-in tariff policy","year":2012,"lang":"en","type":"article","venue":"2nd International Conference on the Developments in Renewable Energy Technology (ICDRET 2012)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Tariff; Investment (military); Renewable energy; Risk aversion (psychology); Duration (music); Feed-in tariff; Rate of return; Environmental economics; Photovoltaic system; Economics; Payment; Business; Microeconomics; Natural resource economics; Finance; Engineering; Expected utility hypothesis; Energy policy; International economics; Financial economics","score_opus":0.016687020109253308,"score_gpt":0.2367154865663964,"score_spread":0.2200284664571431,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1804491171","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8074676,0.00037351277,0.12499616,0.009448063,0.002993002,0.001365081,0.00022348292,0.00066964456,0.05246346],"genre_scores_gemma":[0.9954453,0.00021543542,0.001759032,0.0006672835,0.00008074716,0.00032532803,0.00036899818,0.00003944921,0.0010984208],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976989,0.00016584396,0.0006599586,0.00040031088,0.0003580624,0.00071693305],"domain_scores_gemma":[0.99908686,0.00009158205,0.00015376747,0.00036595378,0.00020307263,0.00009875973],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00061811676,0.00035159878,0.00034270488,0.0017105304,0.000080624566,0.000055334047,0.000588993,0.0003825949,0.00009647417],"category_scores_gemma":[0.00036846465,0.00032379283,0.000031640902,0.0015989842,0.00006120775,0.00033786416,0.00016125538,0.00035968766,0.000030607887],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043308257,0.00013970476,0.0065211975,0.000004969233,0.00009485967,0.0000129795335,0.00037106758,0.8984907,0.0060262396,0.084741645,0.0024009263,0.0011523742],"study_design_scores_gemma":[0.0040754387,0.00029854153,0.059271038,0.00089885877,0.000032326003,0.00010184604,0.0025598458,0.72797203,0.1579818,0.027913295,0.016283173,0.0026118245],"about_ca_topic_score_codex":0.010427416,"about_ca_topic_score_gemma":0.024611188,"teacher_disagreement_score":0.18797772,"about_ca_system_score_codex":0.0021101802,"about_ca_system_score_gemma":0.00026881302,"threshold_uncertainty_score":0.99992144},"labels":[],"label_agreement":null},{"id":"W1807300116","doi":"10.1109/pcicon.1991.162944","title":"Outlook for electrical energy from utilities: 1991-1999","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Deregulation; Electric utility; Computer science; Energy (signal processing); Energy mix; Fuel cells; Operations research; Telecommunications; Engineering; Electrical engineering; Economics; Electricity generation; Mathematics; Physics; Market economy","score_opus":0.01045459119502078,"score_gpt":0.1772369109238107,"score_spread":0.1667823197287899,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1807300116","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000766167,0.0031536405,0.90272844,0.000052709398,0.00040415165,0.0001712486,0.000018703064,0.00090928486,0.09179564],"genre_scores_gemma":[0.9789136,0.00019152868,0.00859611,0.00015650377,0.00023768366,0.00010303434,0.00006882646,0.000059240992,0.011673478],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992049,0.0000130646,0.00021505478,0.00016173677,0.00011286758,0.00029238194],"domain_scores_gemma":[0.9995498,0.00015423824,0.000016032065,0.00018724157,0.00002711752,0.00006556325],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003739315,0.00012986947,0.00016002562,0.00008314854,0.000033795583,0.000029246688,0.000116738454,0.00010222168,0.0007210571],"category_scores_gemma":[0.000030339865,0.00012847986,0.00006036694,0.00019469205,0.000006610113,0.00009807054,0.000007001864,0.000053888623,0.000047233963],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028147022,0.0001297154,0.0001933024,0.00007089088,0.00032356638,0.000006938872,0.0008175802,0.040617395,0.0016035751,0.017809583,0.8509676,0.08743174],"study_design_scores_gemma":[0.00027640522,0.000035786998,0.0000097249285,0.000004867647,0.000010987611,0.000001757858,0.0000088593615,0.9041658,0.0024032914,0.00022538556,0.09270035,0.00015677731],"about_ca_topic_score_codex":0.00017272329,"about_ca_topic_score_gemma":0.000029472201,"teacher_disagreement_score":0.97814745,"about_ca_system_score_codex":0.000096976204,"about_ca_system_score_gemma":0.0000036624976,"threshold_uncertainty_score":0.789507},"labels":[],"label_agreement":null},{"id":"W1820012989","doi":"10.5547/01956574.37.1.edev","title":"Integrating Thermal and Hydro Electricity Markets: Economic and Environmental Costs of not Harmonizing Pricing Rules","year":2015,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"HEC Montréal","funders":"","keywords":"Inefficiency; Electricity; Greenhouse gas; Carbon price; Natural resource economics; Tonne; Economics; Electricity market; Vertical integration; Environmental economics; Marginal cost; Consumption (sociology); Welfare; Business; Industrial organization; Microeconomics; Market economy; Waste management","score_opus":0.009276540163444702,"score_gpt":0.17667499361650432,"score_spread":0.16739845345305962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1820012989","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9757647,0.0028462766,0.020081067,0.000033448796,0.00012340194,0.00003273018,0.0000021185515,0.000022416145,0.0010938474],"genre_scores_gemma":[0.99871767,0.0004526627,0.0006719707,0.000017243625,0.00009697384,0.0000015251944,0.0000015129692,0.000019405903,0.000021052578],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993641,0.00008350602,0.00023193377,0.000071435104,0.00009232725,0.00015673997],"domain_scores_gemma":[0.9996761,0.00007371269,0.00010134229,0.000070391005,0.000007093459,0.00007135585],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048826452,0.000103660845,0.00013491753,0.0000710902,0.00008221983,0.000050127004,0.0000900481,0.00003801975,0.000005264092],"category_scores_gemma":[0.000019943152,0.00007772332,0.00001933262,0.000035394125,0.000028758435,0.00016195049,0.000028343233,0.00016097206,5.9645157e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024713163,0.000052315703,0.011514379,0.000049124585,0.0006168231,0.000032109365,0.0062615373,0.422933,0.29947957,0.0028393336,0.0009663957,0.25500828],"study_design_scores_gemma":[0.0006020108,0.000067073226,0.0014323241,0.00006829432,0.000033966095,0.00061482564,0.00040239724,0.95641875,0.039912,0.000112628506,0.00015677899,0.00017892882],"about_ca_topic_score_codex":0.0000355341,"about_ca_topic_score_gemma":0.000006133486,"teacher_disagreement_score":0.5334858,"about_ca_system_score_codex":0.00022291296,"about_ca_system_score_gemma":0.000018848934,"threshold_uncertainty_score":0.3169465},"labels":[],"label_agreement":null},{"id":"W1831589860","doi":"10.1109/lescpe.2003.1204670","title":"Transaction impact analysis and its application in electricity markets","year":2003,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Database transaction; Electricity market; Electricity; Computer science; Transmission system; Transmission (telecommunications); Security analysis; Electric power system; Congestion management; Electric power transmission; Index (typography); Voltage; Reliability engineering; Computer security; Operations research; Telecommunications; Electrical engineering; Engineering; Power (physics); Database","score_opus":0.003219850519556982,"score_gpt":0.20442756403558432,"score_spread":0.20120771351602734,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1831589860","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32334444,0.00029730515,0.6705938,0.0000037590653,0.000013311209,0.00015208143,6.096558e-7,0.00009894441,0.005495725],"genre_scores_gemma":[0.9994576,0.0001257999,0.00031917487,0.0000036269498,0.0000031332927,0.000021197202,0.0000049182795,0.000009253388,0.000055327906],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995049,0.000038079055,0.00014204292,0.00011293511,0.00006728399,0.00013471316],"domain_scores_gemma":[0.99983096,0.000024748177,0.000015149171,0.00007703792,0.000017361781,0.000034758643],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018932544,0.00007765809,0.00011994571,0.00036178602,0.000014084296,0.000012314466,0.000024693922,0.000057227462,0.00004314122],"category_scores_gemma":[0.0000124852495,0.00007603117,0.00003234677,0.0017387961,0.0000014520116,0.00012521697,5.777794e-7,0.000060138118,0.000004507074],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003120664,0.000093085466,0.09669462,0.000105451356,0.0007404299,0.0000023301905,0.0002793207,0.83262527,0.04287699,0.0010777344,0.00012141346,0.025352137],"study_design_scores_gemma":[0.00016335533,0.000009702542,0.059087895,0.000001421616,0.0000561697,0.000003689497,0.0000030637004,0.92587477,0.014632792,0.00002589289,0.000040531486,0.00010068805],"about_ca_topic_score_codex":0.00004457791,"about_ca_topic_score_gemma":0.00014014525,"teacher_disagreement_score":0.6761131,"about_ca_system_score_codex":0.00013049504,"about_ca_system_score_gemma":0.0000071256395,"threshold_uncertainty_score":0.3100461},"labels":[],"label_agreement":null},{"id":"W1847163448","doi":"10.1109/pes.2005.1489347","title":"Multi-interval optimization for real-time power system scheduling in the ontario electricity market","year":2005,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2005","topic":"Electric Power System Optimization","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Economic dispatch; Scheduling (production processes); Computer science; Operator (biology); Interval (graph theory); Electricity; Electricity market; Electric power system; Power system simulation; Operations research; Real-time computing; Mathematical optimization; Operations management; Power (physics); Engineering; Electrical engineering","score_opus":0.006059586496709516,"score_gpt":0.20148440079941146,"score_spread":0.19542481430270195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1847163448","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20864724,0.0005917778,0.7848389,0.00009974832,0.0012276417,0.0012871013,0.000017699094,0.0012215486,0.0020683042],"genre_scores_gemma":[0.57154006,0.00007686716,0.42634395,0.000085882915,0.00046729753,0.00026148674,0.000034297565,0.00019643972,0.0009937477],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99723667,0.0000864834,0.0007889473,0.0004748016,0.00039375375,0.0010193593],"domain_scores_gemma":[0.9990106,0.00017762954,0.00014068371,0.0004314433,0.00011701478,0.00012260652],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0016217472,0.00051390746,0.00047549696,0.0001603019,0.00013437044,0.00015543212,0.00047449055,0.00033388395,0.000073283816],"category_scores_gemma":[0.0000700328,0.0005008584,0.00034793158,0.0005276119,0.000016170872,0.00032575658,0.000024070503,0.00047412896,0.000018965315],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011353426,0.000050612573,0.00012386478,0.00010633112,0.00009871135,0.0000019598085,0.0020874874,0.97994184,0.009267143,0.000018687424,0.0082534505,0.000038545135],"study_design_scores_gemma":[0.00093330716,0.00004313056,0.00024080789,0.00017158991,0.00004023215,0.000024764608,0.00007614826,0.9926399,0.002353573,2.454876e-7,0.0029467852,0.0005295447],"about_ca_topic_score_codex":0.00038488387,"about_ca_topic_score_gemma":0.0004465495,"teacher_disagreement_score":0.3628928,"about_ca_system_score_codex":0.0019114482,"about_ca_system_score_gemma":0.00007919081,"threshold_uncertainty_score":0.9997443},"labels":[],"label_agreement":null},{"id":"W1858155706","doi":"","title":"The Effects of Competition Policy on TFP Growth: Some Evidence from the Malaysian Electricity Supply Industry","year":2009,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Total factor productivity; Electricity; Mains electricity; Productivity; Competition (biology); Industrial organization; Electric power industry; Economics; Index (typography); Government (linguistics); Business; Quarter (Canadian coin); Monetary economics; Power (physics); Macroeconomics; Engineering","score_opus":0.01298600534602994,"score_gpt":0.2670560271587616,"score_spread":0.25407002181273164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1858155706","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97656614,0.0040854383,0.00012494077,0.002310838,0.0009824005,0.0027399957,0.00007124738,0.0001948541,0.012924145],"genre_scores_gemma":[0.9593759,0.039569844,0.000088467285,0.00005944788,0.0005214283,0.00018128962,0.00003204019,0.000061417406,0.00011013566],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970995,0.00064645277,0.0006407222,0.00050702854,0.00038718543,0.0007191057],"domain_scores_gemma":[0.99408734,0.004394273,0.0001886766,0.001109781,0.000112305395,0.00010762513],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0015070419,0.00032585755,0.0004491349,0.0003958435,0.00017799213,0.00016937677,0.00118118,0.0007262916,0.000006876449],"category_scores_gemma":[0.0022273858,0.00026140467,0.0001380389,0.00042472687,0.00014541554,0.00014423185,0.00025807976,0.0033365318,0.0000078482335],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000281299,0.00023264662,0.014291252,0.0012059348,0.00056242273,0.00004136529,0.0011280002,0.7759735,0.003436785,0.013305032,0.0010424994,0.18849926],"study_design_scores_gemma":[0.0026078885,0.0015240948,0.25035748,0.013708627,0.00010470768,0.00003049301,0.0003562948,0.6441254,0.050270844,0.031580728,0.0027205786,0.00261288],"about_ca_topic_score_codex":0.00072406465,"about_ca_topic_score_gemma":0.00015637217,"teacher_disagreement_score":0.23606624,"about_ca_system_score_codex":0.0018297095,"about_ca_system_score_gemma":0.0005389664,"threshold_uncertainty_score":0.9999838},"labels":[],"label_agreement":null},{"id":"W186602825","doi":"","title":"Peaking Capacity in Restructured Power Systems","year":2000,"lang":"en","type":"dissertation","venue":"BIBSYS Brage (BIBSYS (Norway))","topic":"Electric Power System Optimization","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Power (physics); Theme (computing); Electricity demand; Electric power system; Business; Economics; Environmental economics; Electricity generation; Engineering; Computer science; Electrical engineering; Physics","score_opus":0.010583949086896893,"score_gpt":0.20284103068818127,"score_spread":0.19225708160128438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W186602825","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66582197,0.013172326,0.003117872,0.00001792421,0.014857387,0.004015267,0.0004222822,0.0018914335,0.29668352],"genre_scores_gemma":[0.98727614,0.00050662475,0.00032535038,0.000022740445,0.0003373935,0.00030126076,0.0014743698,0.00047742887,0.009278698],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.994642,0.00031483424,0.0017207153,0.0010780033,0.0009896914,0.0012547505],"domain_scores_gemma":[0.9977475,0.0001520504,0.0004435759,0.0012041556,0.00018551643,0.00026720235],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0005488265,0.0012061499,0.001430266,0.002404324,0.00017912027,0.00040942561,0.0008757889,0.0015961773,0.0007417564],"category_scores_gemma":[0.00012551877,0.0013606815,0.0002859277,0.0026176113,0.00003395239,0.0005365392,0.000029874476,0.0014916044,0.0005718079],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010323925,0.0004983306,0.0020121231,0.0172438,0.0017637198,0.0015565826,0.025886232,0.8439231,0.029122403,0.003489946,0.06216738,0.011304012],"study_design_scores_gemma":[0.020538487,0.0014764484,0.22042452,0.03545837,0.0020363934,0.0021059331,0.008799046,0.49533328,0.014127264,0.0019043027,0.16385701,0.033938956],"about_ca_topic_score_codex":0.00058491714,"about_ca_topic_score_gemma":0.0013284102,"teacher_disagreement_score":0.3485898,"about_ca_system_score_codex":0.0010655893,"about_ca_system_score_gemma":0.00017083118,"threshold_uncertainty_score":0.99969995},"labels":[],"label_agreement":null},{"id":"W1871762981","doi":"","title":"El modelo HRV para la expansión óptima de redes de transmisión: Una aplicación a la red eléctrica de Ontario","year":2012,"lang":"es","type":"article","venue":"LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.017666369273542946,"score_gpt":0.2450029443137632,"score_spread":0.22733657504022026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1871762981","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29573408,0.005254855,0.4908532,0.0064893896,0.0014368767,0.0024288455,0.00017669536,0.0022747805,0.1953513],"genre_scores_gemma":[0.96936077,0.0008444057,0.026661213,0.00016727432,0.0010724524,0.00067731657,0.00021082677,0.0003158188,0.0006899117],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9910974,0.0015969027,0.0017196718,0.0012802351,0.0013367945,0.0029689986],"domain_scores_gemma":[0.99485385,0.00093098974,0.0006386495,0.0013497005,0.0004966747,0.0017301352],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.002279936,0.0013556953,0.0012893706,0.0010612181,0.0010050532,0.0009405338,0.0013075711,0.0021494504,0.00008255302],"category_scores_gemma":[0.0007008688,0.0015217862,0.0006419592,0.0017161408,0.00007118235,0.0013461914,0.00022028087,0.0021928784,0.000034563807],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012129741,0.0029953972,0.011954804,0.0015593277,0.0018172098,0.00074467645,0.032972425,0.054847732,0.04718945,0.8367938,0.0031692325,0.004742964],"study_design_scores_gemma":[0.0037853802,0.00021892805,0.028576456,0.0012836623,0.00078252034,0.0075939763,0.0003801287,0.06347404,0.0072679836,0.0010074252,0.88308406,0.0025454315],"about_ca_topic_score_codex":0.00016992177,"about_ca_topic_score_gemma":0.0006949641,"teacher_disagreement_score":0.8799148,"about_ca_system_score_codex":0.00644358,"about_ca_system_score_gemma":0.0028557647,"threshold_uncertainty_score":0.9999194},"labels":[],"label_agreement":null},{"id":"W1897310719","doi":"10.3386/w21627","title":"Natural Gas Prices and Coal Displacement: Evidence from Electricity Markets","year":2015,"lang":"en","type":"report","venue":"National Bureau of Economic Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Natural gas; Electricity; Coal; Natural gas prices; Natural resource economics; Natural (archaeology); Oil and natural gas; Economics; Environmental science; Business; Fossil fuel; Geology; Engineering; Waste management; Paleontology; Electrical engineering","score_opus":0.1994799336872394,"score_gpt":0.4484341205846312,"score_spread":0.24895418689739182,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1897310719","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06758379,0.13808715,0.0009320787,0.0004919432,0.00406776,0.0032609825,0.00051955745,0.00030914694,0.7847476],"genre_scores_gemma":[0.98596805,0.0104426835,0.0003398322,0.0000029093756,0.00067224377,0.00008674669,0.00046820336,0.00006275844,0.0019565832],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9959744,0.00016143784,0.0006676102,0.0004692773,0.002309417,0.00041784922],"domain_scores_gemma":[0.99585074,0.0016342144,0.00021154252,0.00025805598,0.0019102478,0.00013521741],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0059108455,0.00025419978,0.0004905633,0.000710568,0.000069788985,0.00010885906,0.00042047657,0.0003430792,0.00014932253],"category_scores_gemma":[0.0021688077,0.0002675951,0.00006746959,0.00021882597,0.0000891933,0.00038341334,0.00012332894,0.0007832045,0.000050879607],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000393369,0.000091960945,0.005021566,0.0016962409,0.0014768793,0.000018047747,0.00030660816,0.025064675,0.001159692,0.0037543522,0.9557867,0.005229925],"study_design_scores_gemma":[0.0028167276,0.00052217644,0.014222783,0.0033183543,0.00021752038,0.00017712014,0.00008111404,0.84616643,0.0042954823,0.054845486,0.070881754,0.0024550606],"about_ca_topic_score_codex":0.0012303437,"about_ca_topic_score_gemma":0.00021733006,"teacher_disagreement_score":0.91838425,"about_ca_system_score_codex":0.004804457,"about_ca_system_score_gemma":0.0024668348,"threshold_uncertainty_score":0.99997765},"labels":[],"label_agreement":null},{"id":"W1902836177","doi":"10.15173/esr.v21i2.2770","title":"MARKET POWER IN POWER MARKETS: THE CASE OF FRENCH WHOLESALE ELECTRICITY MARKET","year":2015,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Wholesale market; Market power; Electricity market; Market share analysis; Panel data; Electricity; Economics; Power (physics); Factor market; Business; Market share; Market microstructure; Industrial organization; Market economy; Econometrics; Order (exchange); Finance","score_opus":0.015623107619507309,"score_gpt":0.24870851700162097,"score_spread":0.23308540938211367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1902836177","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001510069,0.8627218,0.0011631519,0.00031945086,0.00051896175,0.0003848266,0.00000876075,0.00010591905,0.13326709],"genre_scores_gemma":[0.69332725,0.30253363,0.00036118645,0.00043410307,0.000046993282,0.0001734714,0.000004611089,0.00006774084,0.0030510062],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.998036,0.00043885136,0.0006954589,0.00024111859,0.00022508675,0.00036347812],"domain_scores_gemma":[0.9987596,0.00029841598,0.00014167315,0.0005148875,0.00021235387,0.00007306943],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016393402,0.00027539616,0.0006954714,0.00012739313,0.00004094404,0.000011479811,0.0002524487,0.000072827315,0.00021849333],"category_scores_gemma":[0.00064426736,0.00019808575,0.00010467695,0.0012299418,0.000054148943,0.000118857875,0.00008890071,0.00016868381,0.000007348333],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014497786,0.00005634907,0.0003415811,0.0014097998,0.0003545724,0.00031623323,0.000373585,0.0006806799,0.0000042700112,0.00030690368,0.98598075,0.010160754],"study_design_scores_gemma":[0.0014846213,0.0002446778,0.0021741395,0.005533863,0.00029683104,0.0013563583,0.0006262423,0.013319098,0.0001659856,0.00032182422,0.9732826,0.0011937991],"about_ca_topic_score_codex":0.00010399037,"about_ca_topic_score_gemma":0.00026298282,"teacher_disagreement_score":0.6918172,"about_ca_system_score_codex":0.0002481551,"about_ca_system_score_gemma":0.000044192013,"threshold_uncertainty_score":0.8077702},"labels":[],"label_agreement":null},{"id":"W1904940903","doi":"10.1109/ptc.2003.1304698","title":"Mitigating market power in financial transmission-right allocations","year":2004,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Consejo Nacional de Ciencia y Tecnología","keywords":"Position (finance); Transmission (telecommunications); Quadratic programming; Node (physics); Mathematical optimization; Transmission network; Market power; Computer science; Power transmission; Dual (grammatical number); Quadratic equation; Power (physics); Business; Finance; Microeconomics; Economics; Telecommunications; Mathematics; Engineering","score_opus":0.002630452761370624,"score_gpt":0.178632672096355,"score_spread":0.1760022193349844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1904940903","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033199627,0.0003288355,0.74974436,0.00035987466,0.00026344915,0.00028833907,0.000001855573,0.0004661466,0.21534754],"genre_scores_gemma":[0.98389804,0.000018850382,0.01550068,0.000050555907,0.000018710141,0.000022182197,0.000004639523,0.000019710413,0.00046664054],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937266,0.000012339709,0.00022207391,0.000107062915,0.00009652223,0.00018931247],"domain_scores_gemma":[0.99979335,0.000023064693,0.000011892138,0.00010477437,0.000019371559,0.000047532078],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010350339,0.00009156796,0.000093757444,0.0001119419,0.000032437543,0.000015940339,0.00007799082,0.00007258778,0.0004198584],"category_scores_gemma":[0.000026051246,0.00009015097,0.00002569866,0.00040113603,0.00000678486,0.00013259337,0.0000036598149,0.00009917936,0.000026705005],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009263809,0.00012359938,0.00095654937,0.00012226103,0.000024962737,0.00003991167,0.0021969816,0.9565811,0.0076741744,0.013294312,0.011540771,0.007436076],"study_design_scores_gemma":[0.0081196595,0.0002264637,0.060099777,0.0014671339,0.000048338075,0.00014172921,0.00028253908,0.7716537,0.092785425,0.010934529,0.051386014,0.0028546879],"about_ca_topic_score_codex":0.000026041926,"about_ca_topic_score_gemma":0.00006001259,"teacher_disagreement_score":0.9506984,"about_ca_system_score_codex":0.000125656,"about_ca_system_score_gemma":0.000051579926,"threshold_uncertainty_score":0.45971552},"labels":[],"label_agreement":null},{"id":"W1916939408","doi":"","title":"Algoritmo para determinar la seguridad de voltaje de un sistema eléctrico de potencia basado en sistemas de área amplia","year":2013,"lang":"es","type":"dissertation","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Physics; Humanities; Philosophy","score_opus":0.005673704611751429,"score_gpt":0.23066937661843473,"score_spread":0.2249956720066833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1916939408","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27780446,0.0033038284,0.68829757,0.00008390335,0.0009086545,0.0025476876,0.000060732364,0.0014573631,0.025535798],"genre_scores_gemma":[0.8806081,0.001417559,0.09372694,0.00014920895,0.0006418959,0.0007592052,0.0006503512,0.0006378482,0.021408895],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99289936,0.0011600661,0.0017201985,0.0011138371,0.00079793314,0.0023085987],"domain_scores_gemma":[0.9954794,0.0013780617,0.0007143685,0.0011617435,0.0004617327,0.0008047061],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.0020273104,0.001475759,0.0015096746,0.0008307587,0.00028944635,0.0006517599,0.0011462867,0.0024947242,0.00027823716],"category_scores_gemma":[0.00090748176,0.0016503651,0.0005985647,0.0011678118,0.00004761374,0.00051018194,0.00007953374,0.0012037517,0.00042579114],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009863551,0.0026286184,0.11468103,0.06277844,0.009089433,0.0030804244,0.037352886,0.34446865,0.24110654,0.012516334,0.028803375,0.1425079],"study_design_scores_gemma":[0.0022367463,0.0005435169,0.10518267,0.0044101183,0.0021551948,0.0012360554,0.0017996274,0.82605463,0.049144715,0.00051375234,0.0024410018,0.0042819674],"about_ca_topic_score_codex":0.002785911,"about_ca_topic_score_gemma":0.00019478699,"teacher_disagreement_score":0.60280365,"about_ca_system_score_codex":0.0032569482,"about_ca_system_score_gemma":0.0014230252,"threshold_uncertainty_score":0.9997992},"labels":[],"label_agreement":null},{"id":"W1920262488","doi":"","title":"Electricity market restructuring : perspectives from abroad","year":2014,"lang":"en","type":"article","venue":"SA Mercantile Law Journal = SA Tydskrif vir Handelsreg","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"","keywords":"Restructuring; Electricity; Generator (circuit theory); Politics; Economics; Product (mathematics); Electricity market; Grid; Power (physics); Homogeneous; Boundary (topology); Point (geometry); Corporate governance; Market economy; Business; Electrical engineering; Law; Mathematics; Political science; Engineering; Physics; Finance; Statistical physics","score_opus":0.004185137286350116,"score_gpt":0.20410083571592869,"score_spread":0.19991569842957857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1920262488","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5586044,0.0106706945,0.16134873,0.00030434178,0.0039717597,0.0006680536,0.0000569641,0.0013887652,0.2629863],"genre_scores_gemma":[0.99437004,0.0009593079,0.0029612237,0.000078550955,0.001140558,0.000013089321,0.000011095579,0.00013347367,0.00033263987],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969742,0.0003094661,0.0007296083,0.0004714303,0.0006394873,0.0008758405],"domain_scores_gemma":[0.99847764,0.00020986247,0.00022701245,0.0005274219,0.00020663309,0.00035144165],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006954921,0.0004952935,0.0006165937,0.00029691643,0.0005378353,0.00035395555,0.00056466134,0.00026527472,0.00088898744],"category_scores_gemma":[0.00013816128,0.00048285944,0.00022551249,0.0005853259,0.00008218572,0.0007063834,0.000041268628,0.0010197453,0.00006048606],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018446937,0.0008322493,0.013218244,0.00095189083,0.0067323297,0.0006954426,0.022987936,0.23336428,0.3055651,0.05737824,0.122192316,0.23423728],"study_design_scores_gemma":[0.008893599,0.0010153386,0.046700846,0.0016068122,0.0008440346,0.0023325235,0.0014619546,0.6093395,0.1520581,0.017884212,0.1523904,0.005472715],"about_ca_topic_score_codex":0.00041632078,"about_ca_topic_score_gemma":0.00037711507,"teacher_disagreement_score":0.43576568,"about_ca_system_score_codex":0.00042786292,"about_ca_system_score_gemma":0.000058115496,"threshold_uncertainty_score":0.9997623},"labels":[],"label_agreement":null},{"id":"W1921097830","doi":"10.1109/lescpe.2004.1356257","title":"Economic dispatch of all thermal power systems with fuzzy load","year":2004,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Economic dispatch; Electric power system; Fuzzy logic; Computer science; Mathematical optimization; Simple (philosophy); Power (physics); Control theory (sociology); Fuzzy control system; Mathematics; Artificial intelligence","score_opus":0.0034472783567471845,"score_gpt":0.17136427820815478,"score_spread":0.1679169998514076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1921097830","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73776335,0.00058133295,0.09813377,0.000037185702,0.0005180379,0.00038204255,0.000005929178,0.00037804144,0.1622003],"genre_scores_gemma":[0.99901956,0.000009731736,0.0006759539,0.0000067674055,0.000015325402,0.000011541789,0.0000028656889,0.000030116762,0.00022815143],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99944156,0.000007709078,0.00019276627,0.000099622484,0.00009454773,0.00016376494],"domain_scores_gemma":[0.99970186,0.000010602121,0.000034651035,0.00018876286,0.000024760107,0.00003933753],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000072459574,0.00010515568,0.00015472474,0.000041104147,0.000008671655,0.000017036835,0.00009142073,0.000050329632,0.00003337249],"category_scores_gemma":[0.000001549492,0.000084082254,0.000022130762,0.0000646285,0.000009217106,0.00011634629,0.000006781941,0.000046063633,0.00007160381],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005364865,0.000008675282,0.0006087626,0.000039117363,0.000058469457,0.000002021614,0.0001735405,0.9964552,0.0008688059,0.0015950889,0.00016593018,0.000019006246],"study_design_scores_gemma":[0.015832633,0.0022209575,0.0222347,0.0013517131,0.00035896114,0.0005096376,0.0013221407,0.84505635,0.09767594,0.00029721763,0.008618247,0.0045215217],"about_ca_topic_score_codex":0.00033945506,"about_ca_topic_score_gemma":0.00009242098,"teacher_disagreement_score":0.2612562,"about_ca_system_score_codex":0.00026200592,"about_ca_system_score_gemma":0.000046771638,"threshold_uncertainty_score":0.34287748},"labels":[],"label_agreement":null},{"id":"W1940870159","doi":"10.1109/ccece.1996.548122","title":"Economic impact of nonutility generation on hydrothermal systems with variable head hydro units","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Variable (mathematics); Hydrothermal circulation; Computer science; Energy (signal processing); Head (geology); Sensitivity (control systems); Operations research; Environmental economics; Reliability engineering; Engineering; Economics; Geology; Mathematics","score_opus":0.01808281207877837,"score_gpt":0.2055270726915986,"score_spread":0.1874442606128202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1940870159","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8314454,0.0002309208,0.07938606,0.00000407232,0.00025353662,0.00046188667,0.000022107235,0.00027218493,0.08792385],"genre_scores_gemma":[0.9990522,0.000010775263,0.0002883167,0.000003566872,0.00007017398,0.000016856366,0.000014855902,0.00002970111,0.0005135117],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99931884,0.000036651138,0.00024259288,0.00013433107,0.000088002,0.000179577],"domain_scores_gemma":[0.99959016,0.000024495608,0.00004754782,0.00025134708,0.000035873152,0.00005056862],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011576465,0.00013729793,0.00018910767,0.00009080067,0.000025312449,0.00002632906,0.000072141964,0.000069528105,0.00028492053],"category_scores_gemma":[0.0000048066677,0.0001114454,0.000022790076,0.00021286916,0.000008314286,0.00015866426,0.0000035886708,0.000062540064,0.000057396283],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000061021956,0.000013286658,0.00064564304,0.000029155995,0.00005888639,4.7034038e-7,0.000047495236,0.9958643,0.0016545343,0.00036986117,0.0012094869,0.0001008278],"study_design_scores_gemma":[0.00030828107,0.00019934618,0.0002060306,0.000025728641,0.000008639651,0.000010307399,0.0000026886137,0.9959246,0.0031076826,0.0000010028916,0.00008632055,0.00011935501],"about_ca_topic_score_codex":0.00059967866,"about_ca_topic_score_gemma":0.00004951424,"teacher_disagreement_score":0.16760686,"about_ca_system_score_codex":0.00043734015,"about_ca_system_score_gemma":0.00003156177,"threshold_uncertainty_score":0.45446113},"labels":[],"label_agreement":null},{"id":"W1951320129","doi":"10.1109/lescpe.2001.941616","title":"Linear programming based algorithm for reactive power constrained real power dispatch and pricing","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"AC power; Economic dispatch; Computer science; Mathematical optimization; Linear programming; Electric power system; Electricity; Nonlinear system; Power (physics); Voltage; Nonlinear programming; Electricity pricing; Electricity market; Algorithm; Engineering; Mathematics; Electrical engineering","score_opus":0.007818997921685443,"score_gpt":0.2075410853718087,"score_spread":0.19972208745012326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1951320129","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003644968,0.00016147856,0.98125935,0.000068238485,0.0001881267,0.00081317656,0.000010856699,0.0005910393,0.013262775],"genre_scores_gemma":[0.6774387,0.000021678858,0.32194218,0.000034376593,0.000040287756,0.00008960173,0.000016082942,0.000061042905,0.0003560937],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990541,0.000016861244,0.00023995212,0.00022533085,0.00012790499,0.000335866],"domain_scores_gemma":[0.99949807,0.00013798177,0.000041748317,0.00014734674,0.00008374345,0.00009108367],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014972135,0.00018024455,0.00019970314,0.000105389896,0.000063759464,0.00004626977,0.00005959844,0.00010561786,0.00007137677],"category_scores_gemma":[0.000034611214,0.0001724095,0.00004454089,0.00023099281,0.000025029367,0.00015951342,0.000009255866,0.000099823395,0.0000061267274],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050525152,0.00042166287,0.0017493928,0.0004251888,0.0005527051,0.000055012795,0.00469976,0.012992638,0.007591651,0.0014317342,0.0059848367,0.96404487],"study_design_scores_gemma":[0.00074026664,0.00013460242,0.00007289891,0.000033662145,0.000018244284,0.000011598154,0.00010342475,0.994765,0.0018678298,0.000005737102,0.0020124943,0.00023425848],"about_ca_topic_score_codex":0.000021192627,"about_ca_topic_score_gemma":0.000005384943,"teacher_disagreement_score":0.98177236,"about_ca_system_score_codex":0.00008419522,"about_ca_system_score_gemma":0.00001039765,"threshold_uncertainty_score":0.7030655},"labels":[],"label_agreement":null},{"id":"W1956653366","doi":"10.1109/ccece.1995.526298","title":"A summary of algorithms in reactive power pricing","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Technical University of Nova Scotia","funders":"","keywords":"AC power; Power factor; Computer science; Power (physics); Power-flow study; Load factor; Power flow; Transformer; Mathematical optimization; Electric power system; Electrical engineering; Engineering; Voltage; Mathematics","score_opus":0.007682006394205023,"score_gpt":0.18778028506699138,"score_spread":0.18009827867278635,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1956653366","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07947454,0.0015444206,0.1683165,0.00006485122,0.0003679679,0.0003957873,0.0000024698682,0.00041525657,0.7494182],"genre_scores_gemma":[0.9959498,0.00003684845,0.0034244042,0.000008382908,0.000008315768,0.000005000769,8.3506336e-7,0.0000138480145,0.0005525893],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956673,0.0000106250445,0.00016232753,0.00006801808,0.000077113255,0.00011518569],"domain_scores_gemma":[0.999815,0.00003161693,0.000017373168,0.00010134531,0.000017650205,0.000017020255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006370264,0.000058341688,0.00011120392,0.00013141829,0.000004441387,0.0000037832244,0.000049789225,0.000040643292,0.000102885395],"category_scores_gemma":[0.000015273348,0.000058018846,0.000015686692,0.00033881218,0.0000041522803,0.0001036411,0.000006380835,0.000061173196,0.000014437081],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003742539,0.00076729147,0.030355312,0.0007023,0.00044356525,0.00015252152,0.024611805,0.6827352,0.08613835,0.003261874,0.09043687,0.0803575],"study_design_scores_gemma":[0.00039112146,0.000040310628,0.0018182856,0.00007356224,0.000004107259,0.000007764978,0.00010259948,0.9820997,0.01459256,0.000023135366,0.00068479724,0.00016204113],"about_ca_topic_score_codex":0.000036929483,"about_ca_topic_score_gemma":0.000010173226,"teacher_disagreement_score":0.91647524,"about_ca_system_score_codex":0.00007075581,"about_ca_system_score_gemma":0.0000021861608,"threshold_uncertainty_score":0.23659399},"labels":[],"label_agreement":null},{"id":"W196070768","doi":"10.15173/esr.v13i1.470","title":"California's Soft Renewable Portfolio Standard","year":2004,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Renewable energy; Renewable portfolio standard; Portfolio; Renewable resource; Economics; Natural resource economics; Restructuring; Environmental economics; Electricity; Business; Industrial organization; Feed-in tariff; Energy policy; Engineering; Finance","score_opus":0.012428742715661155,"score_gpt":0.24199527505715532,"score_spread":0.22956653234149416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W196070768","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000017435106,0.8993862,0.08135192,0.00028061474,0.00041258248,0.00013838221,0.000010019972,0.00040247562,0.018000342],"genre_scores_gemma":[0.01863676,0.9772089,0.0020010672,0.00067921897,0.00013453257,0.00013698838,0.000022022696,0.000060806637,0.0011196814],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99894905,0.000024562727,0.00037980473,0.00017175812,0.00020171638,0.00027307804],"domain_scores_gemma":[0.9995015,0.000023431794,0.000056621222,0.00025947037,0.00010047853,0.00005849461],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019641258,0.00019144017,0.00049483613,0.000051772535,0.000072702846,0.0000109407165,0.00011358464,0.00003996983,0.0000572859],"category_scores_gemma":[0.000093657,0.00016505159,0.000081168655,0.00045539578,0.00002025487,0.00007432577,0.000032975324,0.000057783265,0.00004560914],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000057436328,0.00002673577,0.00004046931,0.0062718405,0.0008631668,0.00006703972,0.00010979031,0.5679371,0.00004268068,0.0028996554,0.36597762,0.055758182],"study_design_scores_gemma":[0.00023470569,0.000034011126,0.000002329953,0.002060313,0.00008295436,0.000021128637,0.000012724441,0.00020941133,0.0005497373,0.00039399756,0.9961489,0.00024983138],"about_ca_topic_score_codex":0.000044424873,"about_ca_topic_score_gemma":0.00008270666,"teacher_disagreement_score":0.63017124,"about_ca_system_score_codex":0.00031047777,"about_ca_system_score_gemma":0.000035571702,"threshold_uncertainty_score":0.6730609},"labels":[],"label_agreement":null},{"id":"W1966350762","doi":"10.1016/j.tej.2014.04.010","title":"Notes from a Small Market: The Energy-only Market in Alberta","year":2014,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Market power; Variety (cybernetics); Investment (military); Factor market; Market microstructure; Industrial organization; Nonmarket forces; Market analysis; Economics; Business; Market share analysis; Market rate; Market economy; Order (exchange); Marketing; Finance; Computer science; Politics; Monopoly; Political science","score_opus":0.00459220662865685,"score_gpt":0.16813772956155898,"score_spread":0.16354552293290214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1966350762","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22985218,0.004659791,0.6705217,0.004709256,0.0014331267,0.0004542602,0.000005509509,0.0002478819,0.088116296],"genre_scores_gemma":[0.99748486,0.000426126,0.0002788501,0.00028981018,0.00047108476,0.000009612245,0.0000018012216,0.00004572577,0.0009921195],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99815154,0.00054508407,0.00040691154,0.00014462708,0.00026121602,0.00049064966],"domain_scores_gemma":[0.9976458,0.0017669982,0.00011930834,0.0003411812,0.000050773913,0.00007591623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013228242,0.00020965723,0.00023254895,0.00015922498,0.00019834514,0.00016115911,0.00064563693,0.000103349856,0.00019985356],"category_scores_gemma":[0.00043845587,0.00012874161,0.00008952004,0.0007222137,0.000022622235,0.000110755325,0.000030068499,0.0006556583,0.000015792753],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00095879025,0.00044647846,0.049130987,0.00010112699,0.0016551677,0.000090479014,0.0060179243,0.20565994,0.012934576,0.008286385,0.2480216,0.46669653],"study_design_scores_gemma":[0.0007398456,0.00007698641,0.017325368,0.00006613755,0.00005782959,0.0003931755,0.000013819112,0.9614257,0.0019845034,0.0038495408,0.013722887,0.00034418053],"about_ca_topic_score_codex":0.0013620924,"about_ca_topic_score_gemma":0.002883704,"teacher_disagreement_score":0.76763266,"about_ca_system_score_codex":0.00018592608,"about_ca_system_score_gemma":0.00006061188,"threshold_uncertainty_score":0.52499306},"labels":[],"label_agreement":null},{"id":"W1966716856","doi":"10.1109/tpwrs.2012.2194517","title":"An Optimal Power Flow Algorithm to Achieve Robust Operation Considering Load and Renewable Generation Uncertainties","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":110,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Renewable energy; Probabilistic logic; Mathematical optimization; Electric power system; Generator (circuit theory); Electricity generation; Computer science; Power (physics); Power flow; Economic dispatch; Taguchi methods; Control theory (sociology); Reliability engineering; Engineering; Mathematics","score_opus":0.015279905275534439,"score_gpt":0.2163551612215254,"score_spread":0.20107525594599096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1966716856","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01528625,0.0006611643,0.9771246,0.000033819724,0.004912099,0.000711206,0.000044250854,0.00049092347,0.0007356964],"genre_scores_gemma":[0.97917306,0.000046832323,0.019986253,0.00004354338,0.00010288678,0.0001890843,0.0000160694,0.000088803616,0.0003534558],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99817324,0.00013134646,0.0004755792,0.00034238622,0.00037319475,0.0005042302],"domain_scores_gemma":[0.99905396,0.000041581818,0.00005053821,0.00040245254,0.00014990632,0.00030157025],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00046868774,0.00033504763,0.0003175735,0.00028210806,0.00026618133,0.0002900794,0.000112615315,0.00020454996,0.000063151616],"category_scores_gemma":[0.000005261389,0.0003569753,0.00005207361,0.00032707155,0.000021944858,0.0010897018,0.0000014487773,0.0001943739,0.00005978051],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001772275,0.000057506135,0.0000065949835,0.000029099327,0.00006835716,0.000001636652,0.0023587008,0.9869055,0.008903949,0.000012120762,0.00083254336,0.000806282],"study_design_scores_gemma":[0.0003506008,0.0002973123,0.000010092379,0.00006466165,0.00003666359,0.00008747215,0.0005396187,0.9786302,0.01789647,4.354819e-7,0.0016500534,0.00043646482],"about_ca_topic_score_codex":0.00020040733,"about_ca_topic_score_gemma":0.000063928295,"teacher_disagreement_score":0.9638868,"about_ca_system_score_codex":0.00043639782,"about_ca_system_score_gemma":0.000053871845,"threshold_uncertainty_score":0.99988824},"labels":[],"label_agreement":null},{"id":"W1966990634","doi":"10.1016/j.enpol.2010.03.004","title":"The large-scale integration of wind generation: Impacts on price, reliability and dispatchable conventional suppliers","year":2010,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Dispatchable generation; Wind power; Electricity market; Electricity; Electricity generation; Residual; Reliability (semiconductor); Reliability engineering; Economics; Renewable energy; Distributed generation; Engineering; Power (physics); Computer science; Electrical engineering","score_opus":0.0039944788791157785,"score_gpt":0.2137128345674377,"score_spread":0.20971835568832192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1966990634","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89515966,0.0002442087,0.08470097,0.001031634,0.0010893829,0.00024633066,0.000043609074,0.00014976681,0.017334446],"genre_scores_gemma":[0.998361,0.00009686058,0.00061215844,0.000037913294,0.00030269552,0.000013240292,0.000043686305,0.000015619715,0.0005168616],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999342,0.000028981825,0.0002004793,0.000114795606,0.00013551879,0.00017821869],"domain_scores_gemma":[0.99954915,0.00006302385,0.00005080291,0.0002194469,0.00005550833,0.00006204866],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023696387,0.000095791045,0.00009442596,0.00007695587,0.00010854009,0.000034075634,0.00007492865,0.0000820742,0.000020680927],"category_scores_gemma":[0.00009639231,0.000073395415,0.00002903371,0.00021520024,0.00003812233,0.000105749,0.0000127079475,0.000111099456,0.0000022529207],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060518352,0.00019207917,0.0027813928,0.000095059375,0.00011369978,9.834871e-7,0.0014326731,0.24699613,0.18686077,0.528526,0.024606625,0.008334067],"study_design_scores_gemma":[0.0008747515,0.00013403723,0.012531525,0.000027842314,0.000016497674,0.00001192525,0.00005182563,0.8211538,0.1075762,0.0017200967,0.05559485,0.00030660554],"about_ca_topic_score_codex":0.00014846206,"about_ca_topic_score_gemma":0.00047588174,"teacher_disagreement_score":0.5741577,"about_ca_system_score_codex":0.00005730193,"about_ca_system_score_gemma":0.000048505935,"threshold_uncertainty_score":0.2992978},"labels":[],"label_agreement":null},{"id":"W1967209296","doi":"10.1109/pes.2010.5588070","title":"A mixed integer nonlinear program for electric generation expansion with energy and capacity pricing","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Profit (economics); Electricity; Mathematical optimization; Incentive; Integer (computer science); Commodity; Linear programming; Computer science; Incentive compatibility; Nonlinear programming; Integer programming; Nonlinear system; Microeconomics; Economics; Operations research; Mathematics; Engineering; Electrical engineering; Finance","score_opus":0.009751282308505103,"score_gpt":0.19492325666938395,"score_spread":0.18517197436087884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1967209296","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39085332,0.00003320919,0.6079117,0.000012728305,0.00014474885,0.00030487534,6.139017e-7,0.0003143584,0.00042441956],"genre_scores_gemma":[0.89549506,0.000012052766,0.10402927,0.000015411691,0.00013718924,0.00017253163,0.000023312223,0.000032072676,0.000083087245],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999404,0.000010337898,0.00014627338,0.0001601837,0.00008737273,0.00019182073],"domain_scores_gemma":[0.9996864,0.000027058044,0.000026642416,0.00012013199,0.00008911305,0.000050662824],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010309946,0.000121204896,0.000116339805,0.00011193416,0.000055263834,0.000052243795,0.000041269337,0.00009152228,0.000004689264],"category_scores_gemma":[0.000020936315,0.000096390046,0.000016072117,0.00026561666,0.00000803342,0.00014410718,0.000005010463,0.000086217886,5.083929e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025873542,0.0000911005,0.00031200875,0.00011769805,0.00006662631,0.0000011261297,0.0002735768,0.018536324,0.8379406,0.003055567,0.0013357428,0.1382438],"study_design_scores_gemma":[0.00027055238,0.00014730316,0.00003445653,0.000006683223,0.00001183589,0.000017229378,0.000006044099,0.8790772,0.11891185,0.000010998323,0.0013775531,0.00012827577],"about_ca_topic_score_codex":0.00003638632,"about_ca_topic_score_gemma":0.0004671121,"teacher_disagreement_score":0.8605409,"about_ca_system_score_codex":0.000029335564,"about_ca_system_score_gemma":0.000018030005,"threshold_uncertainty_score":0.3930672},"labels":[],"label_agreement":null},{"id":"W1967496564","doi":"10.1002/nav.20185","title":"Stochastic programming models for replication of electricity forward contracts for industry","year":2006,"lang":"en","type":"article","venue":"Naval Research Logistics (NRL)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; University of New Brunswick","funders":"","keywords":"Forward contract; Spot market; Spot contract; Arbitrage; Procurement; Electricity; Stochastic programming; Electricity market; Economics; Forward price; Database transaction; Microeconomics; Forward market; Computer science; Operations research; Industrial organization; Mathematical optimization; Futures contract; Financial economics","score_opus":0.08350826714057481,"score_gpt":0.35848784185826027,"score_spread":0.27497957471768547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1967496564","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003893364,0.00040658723,0.99142444,0.000048601192,0.00010443695,0.0027084379,0.00008455981,0.00017272407,0.0011568385],"genre_scores_gemma":[0.9774765,0.000012124163,0.021005303,0.000003640423,0.0002061638,0.0008516893,0.00013860951,0.000061134815,0.00024484925],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977186,0.00005871016,0.0005264189,0.00036409413,0.00056183786,0.00077036157],"domain_scores_gemma":[0.99664176,0.001394121,0.000110377536,0.00046798092,0.0012846362,0.000101156125],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021998072,0.00016151591,0.00029169326,0.00031743382,0.00013671936,0.00006395482,0.00028547758,0.0003991913,0.000001551862],"category_scores_gemma":[0.0039016367,0.00017164485,0.00007978923,0.00068435224,0.000078011326,0.00013660252,0.000026335732,0.00050324394,0.0000018275707],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013575399,0.00011690099,0.000037974707,0.0004176102,0.00004644229,9.164954e-7,0.000037755875,0.94161165,0.0056990604,0.035238363,0.0035094004,0.0131481765],"study_design_scores_gemma":[0.0006933491,0.00033337087,0.000047810125,0.000050168084,0.000026780344,0.000002972825,0.000013072843,0.9679548,0.010166992,0.019737275,0.0008100026,0.00016338559],"about_ca_topic_score_codex":0.00011705167,"about_ca_topic_score_gemma":0.000033665132,"teacher_disagreement_score":0.9735831,"about_ca_system_score_codex":0.0003991413,"about_ca_system_score_gemma":0.00018546476,"threshold_uncertainty_score":0.6999474},"labels":[],"label_agreement":null},{"id":"W1968260225","doi":"10.5547/issn0195-6574-ej-vol32-no4-9","title":"A Dynamic Oligopolistic Electricity Market with Interdependent Market Segments","year":2011,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"HEC Montréal","funders":"","keywords":"Oligopoly; Economics; Interdependence; Microeconomics; Electricity market; Cournot competition; Investment (military); Production (economics); Duopoly; Nash equilibrium; Market power; Time horizon; Market structure; Electricity; Industrial organization; Finance","score_opus":0.005384120405039433,"score_gpt":0.1745193866999735,"score_spread":0.16913526629493406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968260225","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016608728,0.0006802986,0.75746256,0.000030051153,0.00070334185,0.00009594178,0.0000029930072,0.0002146175,0.22420149],"genre_scores_gemma":[0.9962962,0.00022550016,0.0012162946,0.000046170204,0.00007597241,0.000008642493,0.0000013963825,0.000050951563,0.0020788242],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988192,0.00018553468,0.00026583465,0.00010670281,0.00025735598,0.00036541987],"domain_scores_gemma":[0.99948573,0.00003256089,0.00009871394,0.00022276927,0.000054505144,0.00010570443],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048047598,0.00017986694,0.0001524984,0.0001455136,0.00013104593,0.00005822923,0.00036530904,0.00004688918,0.0005023228],"category_scores_gemma":[0.000014859547,0.00011797861,0.000050329527,0.00026041176,0.000022930482,0.00013175812,0.000027712702,0.00029069738,0.000009810706],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.004742233,0.0015790415,0.013268,0.00054546195,0.011754944,0.003491698,0.017769681,0.31244248,0.0068363682,0.008854613,0.4312081,0.18750738],"study_design_scores_gemma":[0.0021883957,0.00052662194,0.016008332,0.00032000968,0.00029105245,0.0088166185,0.00024419976,0.962995,0.0027349028,0.002062332,0.002801895,0.0010106344],"about_ca_topic_score_codex":0.000030623072,"about_ca_topic_score_gemma":0.00004010823,"teacher_disagreement_score":0.9796875,"about_ca_system_score_codex":0.00027336934,"about_ca_system_score_gemma":0.00003233038,"threshold_uncertainty_score":0.55000824},"labels":[],"label_agreement":null},{"id":"W1968768025","doi":"10.1260/095830506779398920","title":"Prospects of Renewable Energy Development in the European Electricity Sector: Results of the Simulation Tool Green-X","year":2006,"lang":"en","type":"article","venue":"Energy & Environment","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"European Commission","keywords":"Renewable energy; Environmental economics; Electricity; Quarter (Canadian coin); Cost reduction; Business; Computer science; Operations research; Economics; Engineering","score_opus":0.004697179475142777,"score_gpt":0.15176792073845494,"score_spread":0.14707074126331215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968768025","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.60646135,0.0017452028,0.30488318,0.000083140476,0.00032843708,0.0007023159,0.000017128652,0.00015744325,0.08562183],"genre_scores_gemma":[0.99890924,0.000033351997,0.00043091743,0.000013153857,0.000047191836,0.000012882567,0.000021847114,0.0000214317,0.00050999416],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9985969,0.00019452785,0.0005153179,0.00016497247,0.0003374871,0.00019080612],"domain_scores_gemma":[0.9994107,0.00006228389,0.00014792278,0.0003580969,0.000008968024,0.000012010512],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003970438,0.00013823515,0.00014089314,0.00007304094,0.00003899078,0.0000069448984,0.0002265154,0.000045204146,0.000007665067],"category_scores_gemma":[0.000010262082,0.00009909305,0.000040575815,0.000301858,0.000019643478,0.000049775692,0.000028242077,0.000057195288,0.0000012052028],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008148207,0.0000519102,0.00071321585,0.000010216838,0.000011502409,0.0000011392925,0.00013800932,0.9911122,0.005680542,0.00017882226,0.0001427104,0.0019516065],"study_design_scores_gemma":[0.0014274821,0.0000977468,0.14863181,0.0000832363,0.000028494054,0.000004232797,0.000015904405,0.39323366,0.4113085,0.00029768367,0.04444572,0.00042551325],"about_ca_topic_score_codex":0.0017950222,"about_ca_topic_score_gemma":0.0009088186,"teacher_disagreement_score":0.5978785,"about_ca_system_score_codex":0.00018898201,"about_ca_system_score_gemma":0.000016409085,"threshold_uncertainty_score":0.40408972},"labels":[],"label_agreement":null},{"id":"W1969291827","doi":"10.1111/j.1541-0064.2007.00194_1.x","title":"Electric Choices: Deregulation and the Future of Electric Power edited by Andrew N.Kleit, Rowman &amp; Littlefield Publishers Inc., in cooperation with The Independent Institute, Lanham and Oakland, 2007, x + 242 pages, cloth US$ 80.00 (ISBN 0‐7425‐4875‐9), paper US$ 29.95 (ISBN 0‐7425‐4875‐7)","year":2007,"lang":"en","type":"article","venue":"Canadian Geographies / Géographies canadiennes","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Deregulation; Citation; Power (physics); Political science; Management; Operations research; Library science; Law; Engineering; Computer science; Economics; Physics; Market economy","score_opus":0.0027039698133368606,"score_gpt":0.1580049908651426,"score_spread":0.15530102105180574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1969291827","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9248017,0.068530336,0.00031738618,0.0018619106,0.0008956561,0.0017644427,0.00008178904,0.00016990898,0.0015768708],"genre_scores_gemma":[0.98326254,0.015051158,0.00006897069,0.00065975735,0.0002675375,0.00012405982,0.00035721908,0.000097292876,0.0001114747],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9965405,0.0001816434,0.00079383346,0.00065579487,0.00048359414,0.0013446707],"domain_scores_gemma":[0.99785775,0.0002830329,0.0002703187,0.000638658,0.00034104512,0.0006091736],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010435797,0.0006649159,0.0006519024,0.0032137204,0.00057099474,0.00047720267,0.00049618335,0.00051933125,0.000034181474],"category_scores_gemma":[0.00009434294,0.000494803,0.00011199108,0.008531903,0.0006263218,0.0013559811,0.000035935143,0.0008547998,0.0000010457679],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00095470954,0.00016534264,0.6478141,0.0007402278,0.0020777727,0.00014027026,0.0068036024,0.009296157,0.0014102452,0.009164326,0.30151603,0.019917237],"study_design_scores_gemma":[0.005900446,0.0005428662,0.41437253,0.000275045,0.00037434636,0.00034671323,0.0028895212,0.0027977042,0.00017744448,0.00019888625,0.5700259,0.0020986006],"about_ca_topic_score_codex":0.23399906,"about_ca_topic_score_gemma":0.97576165,"teacher_disagreement_score":0.74176264,"about_ca_system_score_codex":0.0002087855,"about_ca_system_score_gemma":0.00023117271,"threshold_uncertainty_score":0.9997504},"labels":[],"label_agreement":null},{"id":"W1971280324","doi":"10.1049/ip-gtd:20050438","title":"Locational balance service auction market for transmission congestion management","year":2006,"lang":"en","type":"article","venue":"IEE Proceedings - Generation Transmission and Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Congestion management; Procurement; Balance (ability); Business; Electricity market; Energy market; Transmission (telecommunications); Service (business); Common value auction; Industrial organization; Consumption (sociology); Microeconomics; Electricity; Computer science; Telecommunications; Marketing; Economics; Engineering; Electric power system","score_opus":0.006262264168592076,"score_gpt":0.19015822372364508,"score_spread":0.183895959555053,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1971280324","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012368816,0.00070502533,0.9831186,0.00071661035,0.00025298967,0.0008333499,0.000053437307,0.00040678296,0.0015443705],"genre_scores_gemma":[0.9837783,0.00045931598,0.01192655,0.000059791066,0.00033982878,0.00030853398,0.0025151707,0.000039769773,0.00057275087],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987138,0.000012891685,0.0004148037,0.00034511904,0.00026216407,0.00025121428],"domain_scores_gemma":[0.9994415,0.000014759815,0.0000761155,0.00006269239,0.00030468617,0.00010025386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027233965,0.00022978804,0.00016044943,0.00010234488,0.0002802897,0.00013369897,0.00006826951,0.00017703726,0.000041628715],"category_scores_gemma":[0.000005077887,0.00023864309,0.0000469437,0.0003962979,0.000016093381,0.00045632842,0.0000040011428,0.00008560828,0.000003647514],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005515731,0.00039800283,0.0006451619,0.0045233993,0.00013731924,0.0000019804231,0.00041244287,0.14969374,0.34783408,0.051569354,0.24929233,0.1949406],"study_design_scores_gemma":[0.0012238472,0.00004749668,0.0023249362,0.00011355544,0.00006557865,0.000017113956,0.000024881547,0.9025554,0.030810602,0.00080259505,0.061706655,0.00030731616],"about_ca_topic_score_codex":0.00000845978,"about_ca_topic_score_gemma":0.0000020169957,"teacher_disagreement_score":0.9714095,"about_ca_system_score_codex":0.00017048889,"about_ca_system_score_gemma":0.000016938724,"threshold_uncertainty_score":0.97315824},"labels":[],"label_agreement":null},{"id":"W1972164570","doi":"10.1049/iet-gtd:20060529","title":"Unit commitment – a fuzzy mixed integer Linear Programming solution","year":2007,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Integer programming; Fuzzy logic; Linear programming; Power system simulation; Robustness (evolution); Computer science; Generator (circuit theory); Flexibility (engineering); Mathematics; Electric power system; Artificial intelligence","score_opus":0.019399948718939592,"score_gpt":0.2450410507496445,"score_spread":0.2256411020307049,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1972164570","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021447754,0.00054305117,0.9752873,0.00018793147,0.00077630527,0.00059519894,0.000034321823,0.000681056,0.00044705145],"genre_scores_gemma":[0.9878288,0.000101003534,0.007531553,0.000023627998,0.00031988177,0.000057372235,0.0039673927,0.000041444495,0.00012892028],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981746,0.00008633797,0.0006146467,0.00028423013,0.0003868742,0.00045331742],"domain_scores_gemma":[0.9992592,0.00003172807,0.000083909705,0.00023207732,0.00020317936,0.00018992508],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00076590263,0.00026155452,0.00020037494,0.00012885519,0.00025714247,0.00007254111,0.000117718904,0.0002446374,0.000045937762],"category_scores_gemma":[0.000024884976,0.00026557158,0.000098857774,0.0006423497,0.000025055353,0.00029376365,0.000008595034,0.00022693416,0.00004463869],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013493313,0.00041495147,0.0004431465,0.00026569073,0.00015252705,0.000018545688,0.00081476994,0.23488744,0.28673318,0.0029094117,0.024705784,0.44851962],"study_design_scores_gemma":[0.0009123827,0.00012861982,0.0005841927,0.000082502,0.000058827605,0.000020093978,0.0000585648,0.69228697,0.18474412,0.000041235715,0.120639734,0.0004427794],"about_ca_topic_score_codex":0.000017292625,"about_ca_topic_score_gemma":0.00003570307,"teacher_disagreement_score":0.9677558,"about_ca_system_score_codex":0.00038360033,"about_ca_system_score_gemma":0.000041736967,"threshold_uncertainty_score":0.9999797},"labels":[],"label_agreement":null},{"id":"W1972720661","doi":"10.1109/tenconspring.2013.6584478","title":"Single buyer - A step forward in Malaysian Electricity Supply Industry reform","year":2013,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Ministère de l'Économie, de la Science et de l'Innovation - Québec","keywords":"Operationalization; Transparency (behavior); Relevance (law); Accountability; Electricity; Context (archaeology); Business; Industrial organization; Key (lock); Process management; Computer science; Computer security; Engineering","score_opus":0.005691594294937185,"score_gpt":0.18295455521360188,"score_spread":0.1772629609186647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1972720661","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7161825,0.00016152767,0.041643005,0.00028650483,0.00025918236,0.0008062836,0.0000023878965,0.000799833,0.2398588],"genre_scores_gemma":[0.9955112,0.0000088284605,0.0024857074,0.0000655935,0.000044570195,0.0000770138,0.000008914318,0.000039494695,0.0017587157],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99894404,0.000019207846,0.0002983983,0.00016285764,0.00014964941,0.0004258224],"domain_scores_gemma":[0.9996056,0.00001801221,0.00002697205,0.00022041891,0.000041325606,0.000087650435],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010288078,0.00015663421,0.00018116822,0.00024427316,0.000019789484,0.00005903992,0.0001469516,0.00029403105,0.00054935005],"category_scores_gemma":[0.000017421893,0.0001457263,0.000032578846,0.00074573257,0.0000065217246,0.0003940028,0.000018694582,0.00036519417,0.00022733604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000069340436,0.0012742995,0.2564007,0.0009868935,0.00056588964,0.00011133348,0.0023328594,0.2246774,0.11373083,0.009375644,0.21457638,0.17589842],"study_design_scores_gemma":[0.0011125263,0.00019422008,0.026773142,0.00008119695,0.000015153302,0.00004630521,0.00020525054,0.9330639,0.03401475,0.00022655839,0.00346948,0.00079750497],"about_ca_topic_score_codex":0.0009280602,"about_ca_topic_score_gemma":0.00023676771,"teacher_disagreement_score":0.7083865,"about_ca_system_score_codex":0.0006420566,"about_ca_system_score_gemma":0.000019012046,"threshold_uncertainty_score":0.60149974},"labels":[],"label_agreement":null},{"id":"W1973140758","doi":"10.1016/s0005-1098(01)00225-4","title":"A decomposition approach for the solution of the unit loading problem in hydroplants","year":2002,"lang":"en","type":"article","venue":"Automatica","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Decomposition; Mathematical optimization; Unit (ring theory); Decomposition method (queueing theory); Computer science; Dynamic programming; Mathematics","score_opus":0.015391325571477476,"score_gpt":0.21347009335455436,"score_spread":0.19807876778307687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1973140758","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043550704,0.00051648426,0.9429859,0.00019498858,0.00015767953,0.0015638722,0.000005570671,0.00024306368,0.010781764],"genre_scores_gemma":[0.98952067,0.000011099256,0.010295173,0.0000074350196,0.00001132249,0.00009433818,0.0000033534427,0.000012693797,0.00004393147],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99949294,0.000030496854,0.00019782131,0.00005962752,0.000088790046,0.00013034366],"domain_scores_gemma":[0.9996803,0.00010188208,0.00004399869,0.00014930431,0.000014561171,0.000009945312],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016045968,0.00006157447,0.000085199004,0.000047378584,0.000052201576,0.0000121176645,0.00012559335,0.00003997578,0.0000066671573],"category_scores_gemma":[0.0000182096,0.000040231935,0.00002817596,0.00028380027,0.000012195877,0.0000635622,0.000010236271,0.000056143817,0.0000035015937],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000053945264,0.00011348715,0.0009211149,0.0007585468,0.00008839644,3.640757e-7,0.002957541,0.9720209,0.010256812,0.0015273195,0.0030645973,0.008285532],"study_design_scores_gemma":[0.00017615958,0.000009774313,0.0007248991,0.00006189571,0.000014264071,0.000007154182,0.000016763508,0.9969979,0.0018226161,0.00008350692,0.000038024275,0.000047059744],"about_ca_topic_score_codex":0.0000065437566,"about_ca_topic_score_gemma":0.0000038644835,"teacher_disagreement_score":0.94596994,"about_ca_system_score_codex":0.00004916994,"about_ca_system_score_gemma":0.0000038790618,"threshold_uncertainty_score":0.16406107},"labels":[],"label_agreement":null},{"id":"W1975330706","doi":"10.1049/iet-gtd.2009.0148","title":"Emission allowances auction for an oligopolistic electricity market operating under cap-and-trade","year":2010,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"McGill University","keywords":"Allowance (engineering); Oligopoly; Cournot competition; Economics; Electricity market; Nash equilibrium; Electricity; Microeconomics; Economic surplus; Emissions trading; Greenhouse gas; Welfare; Market economy; Operations management; Engineering","score_opus":0.012471985184876374,"score_gpt":0.24061284605550398,"score_spread":0.2281408608706276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1975330706","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11675804,0.00030051608,0.8806706,0.0003107052,0.0007248208,0.0005876189,0.00008478245,0.00039268855,0.0001702285],"genre_scores_gemma":[0.9922532,0.0001851829,0.00469832,0.0000491096,0.00051418866,0.000121188714,0.0020269386,0.00004557112,0.000106326355],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984164,0.00009371585,0.0004762133,0.000398678,0.0002587508,0.00035620757],"domain_scores_gemma":[0.9993273,0.000051930834,0.000079580146,0.00020610822,0.00011278466,0.0002222978],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004715133,0.00027193833,0.00022328773,0.00008970637,0.00046742658,0.00017652215,0.00010915149,0.0003003803,0.000058260342],"category_scores_gemma":[0.00006207056,0.00026796173,0.00006726261,0.00031204204,0.000029387964,0.0005625637,0.000004956646,0.00027425637,0.0000015380979],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029556142,0.00006357246,0.000069979505,0.00010216815,0.00002456344,3.755011e-7,0.00013887332,0.05005031,0.9140128,0.0010532675,0.012438605,0.02201595],"study_design_scores_gemma":[0.0005119535,0.00010483818,0.00073114224,0.00002336093,0.00004581612,0.000020144187,0.00002113615,0.8096164,0.18045808,0.00019005947,0.007982744,0.00029431126],"about_ca_topic_score_codex":0.00002591823,"about_ca_topic_score_gemma":0.00003288856,"teacher_disagreement_score":0.8759723,"about_ca_system_score_codex":0.0001315569,"about_ca_system_score_gemma":0.000065214146,"threshold_uncertainty_score":0.99997723},"labels":[],"label_agreement":null},{"id":"W1976223977","doi":"10.2316/journal.203.2007.4.203-3636","title":"LAGRANGIAN RELAXATION-BASED PARTICLE SWARM OPTIMIZATION FOR UNIT COMMITMENT PROBLEM","year":2007,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Lagrangian relaxation; Particle swarm optimization; Mathematical optimization; Relaxation (psychology); Convergence (economics); Lagrangian; Limit (mathematics); Power system simulation; Computer science; Economic dispatch; Mathematics; Applied mathematics; Physics","score_opus":0.007849771026057564,"score_gpt":0.2251284250195706,"score_spread":0.21727865399351304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1976223977","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008855176,0.000796016,0.9865291,0.00013499249,0.0019668113,0.00009012038,0.0000075025114,0.000046596764,0.0015736781],"genre_scores_gemma":[0.9946524,0.00004694057,0.004838565,0.000045657307,0.00021149288,0.000010094969,0.000018931767,0.000024150253,0.00015176169],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988646,0.000027251595,0.00056586234,0.00007853926,0.00030901688,0.00015476406],"domain_scores_gemma":[0.9989638,0.00012824476,0.00022671554,0.000068650654,0.0005225329,0.00009009483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005758862,0.0001077031,0.00015260278,0.00020327928,0.000038336493,0.000084416126,0.00014551333,0.000068011555,0.000009068889],"category_scores_gemma":[0.00003019762,0.00009916272,0.000060045444,0.00012792311,0.000012560733,0.00019912006,0.000006603206,0.00005857061,7.625274e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058979367,0.000034474764,0.00075976236,0.0000234288,0.00014868764,0.000008265761,0.00019842782,0.9939419,0.00026540886,0.0028532387,0.000591305,0.001116139],"study_design_scores_gemma":[0.0016263637,0.00018812131,0.00031223506,0.00017919166,0.000034454595,0.00010001809,0.00017258101,0.9702932,0.0025952281,0.00004761824,0.024272688,0.00017830536],"about_ca_topic_score_codex":0.000031924334,"about_ca_topic_score_gemma":0.000011517455,"teacher_disagreement_score":0.9857972,"about_ca_system_score_codex":0.00013880825,"about_ca_system_score_gemma":0.00003069563,"threshold_uncertainty_score":0.40437382},"labels":[],"label_agreement":null},{"id":"W1976455025","doi":"10.1049/iet-gtd.2010.0109","title":"Dynamic adaptive bacterial foraging algorithm for optimum economic dispatch with valve-point effects and wind power","year":2010,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":92,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Mathematical optimization; Foraging; Economic dispatch; Convergence (economics); Computer science; Wind power; Power (physics); Point (geometry); Electric power system; Mathematics; Engineering","score_opus":0.003183709972350708,"score_gpt":0.19202900197263253,"score_spread":0.18884529200028183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1976455025","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2114691,0.00009461478,0.78643185,0.00007027908,0.0007959613,0.0007533368,0.0001925462,0.000163661,0.000028682469],"genre_scores_gemma":[0.9588707,0.000038126942,0.038609512,0.0000085855,0.00014909136,0.00011239859,0.0021380056,0.000052623942,0.00002095248],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988755,0.00003836199,0.0003084881,0.00034998608,0.00012938974,0.00029828775],"domain_scores_gemma":[0.999475,0.000051997256,0.00007404206,0.00017302447,0.00008077719,0.00014517602],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002114749,0.0002664753,0.00023385129,0.0000656811,0.00019761769,0.00012772066,0.00007481369,0.00018937705,0.00003469197],"category_scores_gemma":[0.000007954518,0.00024793434,0.000076938915,0.00010310394,0.000028823608,0.00042360235,0.0000064122137,0.00017298119,0.0000043734767],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002333354,0.00012780793,0.00012598325,0.0002709534,0.00028979304,0.0000053141816,0.0006885946,0.18126956,0.6203263,0.00083145447,0.0029936258,0.19283733],"study_design_scores_gemma":[0.0014288953,0.00023867321,0.00052384724,0.00004503987,0.00006639155,0.000020569641,0.000012924809,0.9500476,0.04580484,0.000047768815,0.0014442025,0.0003192112],"about_ca_topic_score_codex":0.000008377917,"about_ca_topic_score_gemma":0.000022812845,"teacher_disagreement_score":0.7687781,"about_ca_system_score_codex":0.00018564156,"about_ca_system_score_gemma":0.000056622328,"threshold_uncertainty_score":0.9999973},"labels":[],"label_agreement":null},{"id":"W1976765048","doi":"10.1049/iet-gtd.2009.0099","title":"Re-defining the reactive power dispatch problem in the context of competitive electricity markets","year":2010,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Independent Electricity System Operator; University of Waterloo","funders":"","keywords":"AC power; Electricity market; Context (archaeology); Benchmark (surveying); Electricity; Electric power system; Computer science; Economic dispatch; Schedule; Electricity generation; Power (physics); Mathematical optimization; Reliability engineering; Voltage; Engineering; Electrical engineering; Mathematics","score_opus":0.0054075115036152765,"score_gpt":0.2083517637847045,"score_spread":0.20294425228108923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1976765048","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3272387,0.0006426228,0.6603698,0.0021784992,0.00058389426,0.0016978325,0.00021108749,0.00019994767,0.0068775793],"genre_scores_gemma":[0.9986969,0.00007185815,0.0004039664,0.000052653166,0.000043911357,0.00009079225,0.000605223,0.000018097575,0.000016602358],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9984979,0.00026549358,0.0004561657,0.00020436551,0.00033931775,0.00023673159],"domain_scores_gemma":[0.9992321,0.00019454896,0.000117198804,0.00025086862,0.00016472535,0.00004056973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009025646,0.00017813845,0.00018352468,0.000058129688,0.00015642427,0.000053591422,0.00020480076,0.00015528811,0.000049937637],"category_scores_gemma":[0.00006961829,0.00011884172,0.00007110089,0.00062497385,0.000043605058,0.00019985146,0.000006007892,0.00045999052,0.0000064921587],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003422791,0.0006074612,0.0029777621,0.00018560594,0.00015801557,0.000010111668,0.016212279,0.023933945,0.7984616,0.0725698,0.02859209,0.05594904],"study_design_scores_gemma":[0.0019258986,0.0002441132,0.020935163,0.00017304056,0.000091367605,0.000030117864,0.0018895718,0.43002585,0.5140465,0.0004017153,0.029575873,0.0006608192],"about_ca_topic_score_codex":0.00004223531,"about_ca_topic_score_gemma":0.00017008561,"teacher_disagreement_score":0.6714582,"about_ca_system_score_codex":0.000098042394,"about_ca_system_score_gemma":0.000054049367,"threshold_uncertainty_score":0.48462248},"labels":[],"label_agreement":null},{"id":"W1977381041","doi":"10.1016/j.tej.2012.03.003","title":"Assessing the Economic Value of Transmission in Alberta's Restructured Electricity Market","year":2012,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity market; Economic shortage; Electricity; Clearing; Transmission (telecommunications); Electricity retailing; Business; Economics; Natural resource economics; Environmental economics; Industrial organization; Engineering; Finance; Telecommunications","score_opus":0.00649132535944546,"score_gpt":0.23130224588412063,"score_spread":0.22481092052467516,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1977381041","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9024276,0.004705117,0.08267665,0.00049526547,0.0007071867,0.00041409562,9.734488e-7,0.00006290898,0.008510205],"genre_scores_gemma":[0.9986565,0.00047090568,0.00042496054,0.00003471491,0.00027950914,0.0000052959717,9.4817653e-7,0.000037473266,0.00008966132],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99787045,0.0005128972,0.00061020476,0.00010653841,0.00026255028,0.00063736556],"domain_scores_gemma":[0.99882466,0.00057530694,0.00021717064,0.00024897847,0.000035749355,0.000098144425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020541346,0.00020601333,0.0002909843,0.00024684018,0.0002144034,0.00010591112,0.00047324496,0.00012465799,0.00006989377],"category_scores_gemma":[0.00011193489,0.00012721289,0.00011139424,0.0007529789,0.00003029269,0.00054599514,0.000014202981,0.00084784714,0.0000047937415],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028671167,0.00021652735,0.03568154,0.00019975628,0.00065752916,0.000011472709,0.006309611,0.7773494,0.062351853,0.0038118858,0.019995596,0.0931281],"study_design_scores_gemma":[0.0009717517,0.00009026643,0.07878652,0.000103781014,0.00012853033,0.000998626,0.000059320377,0.8703258,0.044225834,0.0018166692,0.0020555367,0.00043737644],"about_ca_topic_score_codex":0.0002267895,"about_ca_topic_score_gemma":0.000031571693,"teacher_disagreement_score":0.096228935,"about_ca_system_score_codex":0.000630298,"about_ca_system_score_gemma":0.00014887376,"threshold_uncertainty_score":0.5187591},"labels":[],"label_agreement":null},{"id":"W1978096359","doi":"10.1109/ccece.2014.6901155","title":"A probabilistic approach to assess wind generation penetration and market prices","year":2014,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada; University of Waterloo","funders":"","keywords":"Probabilistic logic; Wind power; Renewable energy; Electricity market; Electricity; Electric power system; Electricity generation; Wind speed; Penetration (warfare); Environmental economics; Computer science; Market penetration; Environmental science; Reliability engineering; Meteorology; Engineering; Electrical engineering; Power (physics); Operations research; Economics; Artificial intelligence; Geography","score_opus":0.018398320999497498,"score_gpt":0.20540566645078745,"score_spread":0.18700734545128994,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1978096359","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031498905,0.000029586543,0.8075439,0.000016605138,0.000093113995,0.0003403916,4.1012672e-7,0.00016466746,0.16031243],"genre_scores_gemma":[0.9635372,0.0000043447058,0.03583763,0.000028259848,0.00009867021,0.00003422446,0.000014461364,0.000016000055,0.000429197],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945825,0.000034592085,0.00013840395,0.00015086019,0.0001054769,0.00011242838],"domain_scores_gemma":[0.9997501,0.00003182878,0.000016105027,0.00011403596,0.00003559242,0.000052333042],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027155332,0.000085888525,0.00008894442,0.000072759336,0.00003389257,0.00009439934,0.000045948982,0.000048590817,0.000014985732],"category_scores_gemma":[0.000060831346,0.00008080952,0.000008138028,0.00017762609,0.0000040378736,0.00015906463,0.000007831616,0.00003538757,0.000006042608],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000068477293,0.000053973516,0.00087755173,0.00036422294,0.000036764282,1.959917e-7,0.0005542975,0.9450145,0.012575917,0.017668126,0.012731056,0.010116582],"study_design_scores_gemma":[0.00009073623,0.000028114286,0.002404224,0.000004805845,0.0000072915386,0.0000035773717,0.0000075374105,0.9957557,0.00062442204,0.00002997686,0.0009328745,0.000110742934],"about_ca_topic_score_codex":0.000005312571,"about_ca_topic_score_gemma":0.000015370028,"teacher_disagreement_score":0.9320383,"about_ca_system_score_codex":0.00004657086,"about_ca_system_score_gemma":0.0000068803483,"threshold_uncertainty_score":0.32953167},"labels":[],"label_agreement":null},{"id":"W1978813851","doi":"10.1109/tste.2015.2410760","title":"Flexibility Envelopes for Power System Operational Planning","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":220,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Canadian Network for Research and Innovation in Machining Technology, Natural Sciences and Engineering Research Council of Canada","keywords":"Flexibility (engineering); Computer science; Electric power system; Power (physics); Systems engineering; Reliability engineering; Engineering","score_opus":0.017049234759853663,"score_gpt":0.23245409634055342,"score_spread":0.21540486158069977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1978813851","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020065543,0.00021166219,0.98702013,0.000034738074,0.0008589654,0.00028079582,0.000015377509,0.0006522547,0.008919503],"genre_scores_gemma":[0.9917296,0.0000034915695,0.0022258314,0.00003871346,0.000062896426,0.00038386523,0.000014357839,0.000056219855,0.0054850047],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987641,0.000041399362,0.00030295792,0.00024890873,0.00022834388,0.00041428301],"domain_scores_gemma":[0.999136,0.000086026885,0.000029899213,0.0002479919,0.0003529269,0.00014719063],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003164195,0.00019654991,0.00020385487,0.00023267086,0.00018896752,0.000080137004,0.00013185505,0.00013029948,0.000018117256],"category_scores_gemma":[0.000013255211,0.00020721687,0.000071358896,0.0003792061,0.000016657603,0.0003350046,8.3592306e-7,0.00010198895,0.00000843482],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049053382,0.00003123326,0.0000021942876,0.00010199915,0.00005117481,0.000009592416,0.00027457438,0.9906989,0.00007721558,0.0059914743,0.0022911676,0.00042142597],"study_design_scores_gemma":[0.0016677779,0.00032929148,0.0000073624133,0.00007842394,0.000051128965,0.000055357443,0.004820285,0.8910148,0.03825832,0.00029974667,0.06276646,0.00065101543],"about_ca_topic_score_codex":0.000089514644,"about_ca_topic_score_gemma":0.00000771908,"teacher_disagreement_score":0.9897231,"about_ca_system_score_codex":0.00095095206,"about_ca_system_score_gemma":0.00018771683,"threshold_uncertainty_score":0.8450059},"labels":[],"label_agreement":null},{"id":"W1980789656","doi":"10.1016/j.epsr.2008.09.016","title":"Analysis of market signals in a competitive electricity market using components of network rental","year":2008,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Renting; Electricity market; Constraint (computer-aided design); Transmission network; Electricity; Transmission (telecommunications); Economic surplus; Computer science; Microeconomics; Mathematical optimization; Econometrics; Industrial organization; Business; Economics; Telecommunications; Mathematics; Engineering","score_opus":0.0390534136239483,"score_gpt":0.2898762146471059,"score_spread":0.25082280102315757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1980789656","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93917274,0.008561987,0.020013442,0.000004162842,0.00032603243,0.0014309152,0.000040703813,0.00011490283,0.030335138],"genre_scores_gemma":[0.9989167,0.00044073397,0.00015610977,0.0000019276022,0.00003871424,0.000046855563,0.000023681374,0.000058860067,0.00031645352],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9937414,0.00167236,0.0013651592,0.00045633744,0.001557109,0.001207639],"domain_scores_gemma":[0.9973564,0.001062934,0.00027487281,0.00053874316,0.00061189715,0.00015512946],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0037971092,0.00030525008,0.0012784316,0.0038045142,0.0001265268,0.000026415468,0.0005366183,0.00024358772,0.0001844074],"category_scores_gemma":[0.0002376756,0.00033104236,0.00022167285,0.01675762,0.000097528224,0.0001865726,0.000077473946,0.000642922,0.0000052454743],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005753418,0.0005761142,0.15237047,0.00064178737,0.00383325,0.00017384082,0.0010487338,0.7642295,0.064675756,0.0002453482,0.011512782,0.000117084775],"study_design_scores_gemma":[0.00056978693,0.00019168736,0.047998797,0.00023116324,0.00009305249,0.00004796555,0.00005376471,0.94822156,0.002133349,0.0000059999634,0.0001729199,0.00027996735],"about_ca_topic_score_codex":0.0012233022,"about_ca_topic_score_gemma":0.000046203528,"teacher_disagreement_score":0.18399206,"about_ca_system_score_codex":0.00092172006,"about_ca_system_score_gemma":0.00020223034,"threshold_uncertainty_score":0.99991417},"labels":[],"label_agreement":null},{"id":"W1981217786","doi":"10.3138/infor.48.4.267","title":"On European Electricity Market Liberalization: A Game-Theoretic Approach","year":2010,"lang":"en","type":"article","venue":"INFOR Information Systems and Operational Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity market; Liberalization; Electricity; Stackelberg competition; Profit (economics); Electricity retailing; Economics; Industrial organization; Perfect competition; Microeconomics; Business; Market economy; Engineering","score_opus":0.014835968698610542,"score_gpt":0.25576974717776446,"score_spread":0.24093377847915393,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981217786","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03776528,0.00011311293,0.13040856,0.000086876506,0.00064956595,0.0014137307,0.000037559996,0.0003575263,0.8291678],"genre_scores_gemma":[0.99788076,0.00005397697,0.00047052663,0.00008475137,0.00016194233,0.00013299852,0.00017779232,0.000023364571,0.0010138901],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979765,0.00017213085,0.00055027957,0.00012623727,0.00084447203,0.00033037155],"domain_scores_gemma":[0.9987487,0.00020801034,0.00005343544,0.00024280214,0.0006062667,0.00014075567],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024454093,0.00015689983,0.00014927842,0.0005383683,0.00026110452,0.00082918233,0.00019666692,0.000119301076,0.00010610889],"category_scores_gemma":[0.00036872912,0.00014015207,0.000026550992,0.00063235516,0.000063158244,0.0013616766,0.00003491062,0.0005198683,0.00025481044],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006174203,0.00003869511,0.00030602614,0.0005265275,0.0000561135,0.000001810369,0.0020467308,0.1729628,0.00028374125,0.7596405,0.058539137,0.0055361665],"study_design_scores_gemma":[0.00046486055,0.00007825166,0.0010186465,0.00003494826,0.0000026842192,0.00006035942,0.00009614867,0.92825216,0.00010352624,0.00013030428,0.06955054,0.0002075606],"about_ca_topic_score_codex":0.00002022821,"about_ca_topic_score_gemma":0.0000017121046,"teacher_disagreement_score":0.9601155,"about_ca_system_score_codex":0.00008684753,"about_ca_system_score_gemma":0.00008560586,"threshold_uncertainty_score":0.7995824},"labels":[],"label_agreement":null},{"id":"W1981693436","doi":"10.2316/journal.203.2007.4.203-3653","title":"CONCEPTS ON MARKET-ORIENTED TRANSMISSION INVESTMENT","year":2007,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Investment (military); Business; Transmission (telecommunications); Industrial organization; Telecommunications; Computer science; Political science","score_opus":0.00396367155620569,"score_gpt":0.22378172696271686,"score_spread":0.21981805540651117,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981693436","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029645318,0.0039791106,0.83062345,0.00011991482,0.010145578,0.000075478565,0.00000625155,0.000089995585,0.12531494],"genre_scores_gemma":[0.99847174,0.00018419379,0.00023830902,0.00009631972,0.00025289113,0.0000012909037,0.0000028038633,0.000017508879,0.00073494297],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.998831,0.0000339603,0.00048134293,0.00007700193,0.00044241452,0.00013432598],"domain_scores_gemma":[0.9994158,0.0000700394,0.00012776829,0.000059630434,0.00020376558,0.00012298948],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040368238,0.00011260182,0.00015495866,0.00026769066,0.000019713041,0.00004019859,0.00013284049,0.0000670119,0.000030957883],"category_scores_gemma":[0.000014934311,0.00009390238,0.00005348755,0.000088752706,0.000014269909,0.00013759374,0.0000066230623,0.000092992464,0.0000016036199],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002754313,0.0008629164,0.004966707,0.00037589876,0.005078311,0.0024749814,0.010102278,0.5429057,0.034606237,0.15070026,0.13985863,0.105313756],"study_design_scores_gemma":[0.0033344994,0.00069533155,0.0028428049,0.0017758564,0.000040465908,0.0016335668,0.0005291518,0.08980941,0.0073893066,0.00012604723,0.8912917,0.0005318987],"about_ca_topic_score_codex":0.00001637591,"about_ca_topic_score_gemma":0.0000010443559,"teacher_disagreement_score":0.9688264,"about_ca_system_score_codex":0.0001556053,"about_ca_system_score_gemma":0.000017231316,"threshold_uncertainty_score":0.3829228},"labels":[],"label_agreement":null},{"id":"W1983601351","doi":"10.1109/tsg.2014.2320954","title":"A Dynamic Mechanism for Wholesale Energy Market: Stability and Robustness","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Electric Power System Optimization","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Alberta Energy","funders":"","keywords":"Robustness (evolution); Electricity market; Renewable energy; Demand response; Energy market; Dynamic pricing; Electric power system; Economics; Wind power; Power market; Stability (learning theory); Microeconomics; Computer science; Electricity; Power (physics); Engineering","score_opus":0.006194928164210443,"score_gpt":0.18578650372010067,"score_spread":0.17959157555589023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1983601351","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013323017,0.000029783705,0.98398125,0.000055662193,0.0014660109,0.000237145,0.000052227017,0.00032561578,0.0005293109],"genre_scores_gemma":[0.99515676,0.00005501264,0.004199025,0.000028090732,0.000037136862,0.00020713986,0.0000067075484,0.000051266732,0.00025884432],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916476,0.000049628867,0.00021006305,0.00023311692,0.00011103357,0.00023141036],"domain_scores_gemma":[0.99945223,0.00013306223,0.00002456842,0.00025142738,0.00006109903,0.00007758647],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020377953,0.0001661454,0.00018561164,0.00011892827,0.000113148984,0.000032132582,0.0000783703,0.000106900516,0.00003943339],"category_scores_gemma":[0.000005084637,0.00017957958,0.000062237785,0.00016467927,0.000018557806,0.00012315238,4.8666953e-7,0.00009674432,0.0000027397286],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014983802,0.00020489925,0.00001498385,0.00056025846,0.00020457566,0.0000013881814,0.00022714848,0.95077485,0.014553504,0.0011971613,0.0013355454,0.030775845],"study_design_scores_gemma":[0.0004700815,0.00008445098,0.000023873848,0.000023091945,0.000034090364,0.0000091732645,0.000012499754,0.9724298,0.025719687,0.00013354003,0.0008656556,0.00019406968],"about_ca_topic_score_codex":0.000018334189,"about_ca_topic_score_gemma":0.00023313324,"teacher_disagreement_score":0.98183376,"about_ca_system_score_codex":0.000101209276,"about_ca_system_score_gemma":0.000012391898,"threshold_uncertainty_score":0.7323043},"labels":[],"label_agreement":null},{"id":"W1984896319","doi":"10.1016/j.ijepes.2009.03.015","title":"A new computational method for reactive power market clearing","year":2009,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; University of New Brunswick","funders":"","keywords":"AC power; Market clearing; Clearing; Integer programming; Linear programming; Mathematical optimization; Computer science; Activity-based costing; Electricity market; Power market; Transformer; Deregulation; Electric power system; Power (physics); Electricity; Economics; Engineering; Voltage; Mathematics; Electrical engineering; Microeconomics; Finance","score_opus":0.0052748606933173455,"score_gpt":0.24928098388860867,"score_spread":0.24400612319529133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1984896319","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000353662,0.0011535475,0.98353964,0.00033923375,0.0027632928,0.00013863161,0.0000069604876,0.000093900795,0.011611144],"genre_scores_gemma":[0.9647957,0.00003422989,0.03333382,0.00019936227,0.0007163886,0.0000069973316,0.000010445576,0.00004892671,0.0008541417],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99754703,0.000112475405,0.0009644964,0.00020484217,0.0008296788,0.00034147766],"domain_scores_gemma":[0.99787396,0.0004691146,0.0004101277,0.0001238452,0.0009104091,0.0002125514],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005740918,0.00024338358,0.00043441568,0.0006079073,0.000041790052,0.00018026604,0.00051772303,0.00016026123,0.0000484416],"category_scores_gemma":[0.00020048257,0.00023354088,0.00021531113,0.00038895264,0.000007442198,0.00044248634,0.000014029932,0.00026666108,0.0000039592114],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006491408,0.00015515895,0.00005722565,0.000008941745,0.0012152484,0.000096173426,0.00026357203,0.77023375,0.005520905,0.052385528,0.15026079,0.01915359],"study_design_scores_gemma":[0.002734344,0.001222294,0.0007643629,0.00021272182,0.000077478515,0.0017789863,0.00003861248,0.8859196,0.001695163,0.0057213088,0.09925133,0.00058384234],"about_ca_topic_score_codex":0.00003677459,"about_ca_topic_score_gemma":0.0000010817636,"teacher_disagreement_score":0.964442,"about_ca_system_score_codex":0.00063167466,"about_ca_system_score_gemma":0.00017443796,"threshold_uncertainty_score":0.95235205},"labels":[],"label_agreement":null},{"id":"W1985168609","doi":"10.1109/pesgm.2012.6345495","title":"Intra-hour wind power characteristics for flexible operations","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Laplace transform; Wind speed; Skew; Wind profile power law; Meteorology; Probability density function; Spectral density; Environmental science; Mathematics; Statistics; Computer science; Engineering; Physics; Mathematical analysis; Telecommunications","score_opus":0.010345756475263439,"score_gpt":0.22367619575991,"score_spread":0.21333043928464654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1985168609","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026151752,0.00013439814,0.9512243,0.00006098547,0.0012193089,0.0003668433,0.000016507132,0.0006093298,0.020216534],"genre_scores_gemma":[0.98641557,0.00000974746,0.011218883,0.00006445431,0.00018879736,0.000027362239,0.000034103334,0.00003396971,0.002007114],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994658,0.0000063341613,0.00016198524,0.000061018523,0.00005900514,0.00024583863],"domain_scores_gemma":[0.999726,0.000024092622,0.000009240601,0.00012499557,0.000046010795,0.00006966214],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000103079874,0.000086150525,0.00009602021,0.000054704295,0.00004651212,0.00003627219,0.00005844794,0.000057573645,0.00019243284],"category_scores_gemma":[0.00003093545,0.00008349768,0.000024714287,0.000113978705,0.0000041402236,0.00025469242,0.0000059825434,0.000045787016,0.0000888264],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000061168124,0.00094374333,0.025077906,0.0008048711,0.00090701453,0.0000031370844,0.009967795,0.36354023,0.094164774,0.16764274,0.31083083,0.026055785],"study_design_scores_gemma":[0.0011977315,0.00016540702,0.012912522,0.000049706687,0.00008752439,0.000038846785,0.00016918071,0.7664873,0.047968034,0.00006645719,0.16971473,0.0011425404],"about_ca_topic_score_codex":0.00000195638,"about_ca_topic_score_gemma":0.0000015352501,"teacher_disagreement_score":0.9602638,"about_ca_system_score_codex":0.00005138776,"about_ca_system_score_gemma":0.000010492985,"threshold_uncertainty_score":0.34049368},"labels":[],"label_agreement":null},{"id":"W1986421638","doi":"10.1016/j.jup.2004.04.006","title":"Important variables in explaining real-time peak price in the independent power market of Ontario","year":2004,"lang":"en","type":"article","venue":"Utilities Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Econometrics; Explanatory power; Economics; Variables; Variable (mathematics); Competition (biology); Electricity market; Electricity; Support vector machine; Predictive power; Statistics; Mathematics; Computer science; Machine learning; Engineering","score_opus":0.0058103082784255735,"score_gpt":0.20533980238462687,"score_spread":0.1995294941062013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1986421638","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7312188,0.00016175347,0.00029501933,0.00006987879,0.000097163196,0.000344552,0.000011296919,0.000084755826,0.26771677],"genre_scores_gemma":[0.99850816,0.000052975538,0.00045464476,0.000032611733,0.00003500948,0.00003400604,0.0000074178715,0.000024211995,0.00085098366],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9986292,0.00006386641,0.0005418229,0.0001471872,0.00023881938,0.00037910906],"domain_scores_gemma":[0.9994462,0.000114278264,0.000073888434,0.00030861577,0.00002292015,0.000034098546],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007114138,0.00015866446,0.00023727161,0.00037431,0.000021768265,0.000024619607,0.00024263359,0.000099075645,0.00018466715],"category_scores_gemma":[0.000103406775,0.0001407598,0.000033598102,0.00054472056,0.000022882412,0.00015873692,0.000030119472,0.00019950443,0.000005040208],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024366293,0.0005865246,0.11215114,0.0007971375,0.00024442206,0.00023823703,0.52235484,0.24374117,0.0042848946,0.11134865,0.0035695175,0.00043982294],"study_design_scores_gemma":[0.008387139,0.0007523197,0.89956576,0.0018272474,0.000064875814,0.00034409735,0.017892491,0.037020613,0.0033197068,0.017609622,0.010894909,0.002321194],"about_ca_topic_score_codex":0.08546411,"about_ca_topic_score_gemma":0.020783808,"teacher_disagreement_score":0.78741467,"about_ca_system_score_codex":0.0012032967,"about_ca_system_score_gemma":0.00050376536,"threshold_uncertainty_score":0.9970843},"labels":[],"label_agreement":null},{"id":"W1986867400","doi":"10.1109/tdc.2010.5484550","title":"Economic load dispatch with stochastic wind power: Model and solutions","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; University of Alberta","funders":"","keywords":"Economic dispatch; Wind power; Probabilistic logic; Wind speed; Constraint (computer-aided design); Electric power system; Mathematical optimization; Computer science; Random variable; Stochastic process; Set (abstract data type); Power (physics); Control theory (sociology); Engineering; Mathematics; Meteorology; Statistics; Artificial intelligence","score_opus":0.0038410147944908384,"score_gpt":0.17129110412012596,"score_spread":0.16745008932563513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1986867400","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3268082,0.000053746542,0.66328156,0.000047405894,0.00015147174,0.00013229465,0.00000496454,0.00022280849,0.009297527],"genre_scores_gemma":[0.9955394,0.0000038560925,0.004071764,0.000008101264,0.000017286704,0.0000072334283,0.000002234847,0.00002323267,0.00032684664],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995539,0.0000026477971,0.0000959562,0.00011507826,0.000053392687,0.00017898862],"domain_scores_gemma":[0.9997368,0.000016655034,0.000012492923,0.00015210207,0.000017055425,0.00006490027],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000057950772,0.0000931804,0.00008765566,0.00004171544,0.000045279732,0.000031551197,0.000052169376,0.000052891246,0.000046038764],"category_scores_gemma":[0.0000046426944,0.00008255685,0.000009992521,0.00004554365,0.000018985784,0.00014324595,0.000012019153,0.00011009256,0.000032594733],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000020208563,0.0000039120614,0.00011921604,0.000005091068,0.0000137400275,2.0998773e-7,0.00009204276,0.99623203,0.0008576326,0.0021449542,0.00044537432,0.00008378378],"study_design_scores_gemma":[0.00019227774,0.000016957982,0.0003169441,0.000004840897,0.000009412863,0.00001733394,0.000009106408,0.9991413,0.00004563181,0.00008966153,0.000035708817,0.00012083489],"about_ca_topic_score_codex":0.000029576086,"about_ca_topic_score_gemma":0.0007101712,"teacher_disagreement_score":0.6687312,"about_ca_system_score_codex":0.000060902898,"about_ca_system_score_gemma":0.00004665383,"threshold_uncertainty_score":0.33665708},"labels":[],"label_agreement":null},{"id":"W1987959842","doi":"10.1111/j.1467-9965.2002.tb00125.x","title":"A DIFFUSION MODEL FOR ELECTRICITY PRICES","year":2002,"lang":"en","type":"article","venue":"Mathematical Finance","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Electricity; Spot contract; Econometrics; Economics; Diffusion; Electricity market; Electricity demand; Financial economics; Electricity generation; Power (physics); Engineering; Thermodynamics; Physics; Electrical engineering; Futures contract","score_opus":0.016310157059746467,"score_gpt":0.20217307252361827,"score_spread":0.1858629154638718,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1987959842","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02023579,0.00038204176,0.97100735,0.000043500524,0.000039059407,0.00032187745,0.0000031597233,0.00024227874,0.0077249263],"genre_scores_gemma":[0.9308584,0.00010126726,0.06702445,0.000023016039,0.00002764926,0.00013512177,0.0000015676969,0.000030894204,0.0017976464],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993284,0.0000040546233,0.00020218293,0.00012128502,0.000108472195,0.00023564983],"domain_scores_gemma":[0.9996726,0.00008781407,0.000026445221,0.00016040962,0.000025944877,0.00002679665],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007666684,0.00010607123,0.00016380662,0.000040855102,0.00004354409,0.00001963959,0.00011039563,0.000065012464,0.000023687442],"category_scores_gemma":[0.00007994367,0.000097025615,0.000043426477,0.00020198758,0.000008178652,0.00008238569,0.000009046912,0.000063110216,0.00007516435],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017499156,0.0005747294,0.000053670596,0.0023007256,0.000057833353,0.0000048792704,0.00252065,0.6641011,0.006536051,0.2583632,0.03739893,0.028070703],"study_design_scores_gemma":[0.00015202769,0.000019312734,0.000008329734,0.000034250097,0.0000065347767,0.0000035962985,8.7198646e-7,0.9892144,0.0007156756,0.0093067195,0.00042123513,0.000117043506],"about_ca_topic_score_codex":1.5488388e-7,"about_ca_topic_score_gemma":2.3584613e-7,"teacher_disagreement_score":0.9106226,"about_ca_system_score_codex":0.000047989015,"about_ca_system_score_gemma":0.0000026124612,"threshold_uncertainty_score":0.395659},"labels":[],"label_agreement":null},{"id":"W1988194224","doi":"10.1016/j.eneco.2009.02.007","title":"Multiple zone power forwards: A value at risk framework","year":2009,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Center for Interuniversity Research and Analysis on Organizations","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Volatility (finance); Spot contract; Forward contract; Natural gas prices; Economics; Electricity; Electricity market; Context (archaeology); Value (mathematics); Econometrics; Value at risk; Risk management; Forward price; Microeconomics; Financial economics; Computer science; Finance; Engineering; Futures contract","score_opus":0.0027228789434463932,"score_gpt":0.16189124863747276,"score_spread":0.15916836969402637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1988194224","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32767484,0.0009329103,0.6536039,0.000061390165,0.0010194796,0.00009241482,0.00002058235,0.0005068065,0.016087674],"genre_scores_gemma":[0.9877748,0.00060415844,0.010715238,0.00014608781,0.00014069889,0.000011435995,0.000021995742,0.000047539033,0.0005380675],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991678,0.000020185193,0.00027702705,0.00020299295,0.000041183106,0.00029083472],"domain_scores_gemma":[0.9993988,0.00008002908,0.00006981742,0.00034655718,0.000015350608,0.00008938922],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009852995,0.0001727827,0.00020763518,0.00009093204,0.000068449306,0.00003472722,0.00015242957,0.00017954632,0.000065563625],"category_scores_gemma":[0.000044404813,0.00020343348,0.000078036006,0.00011127095,0.000008523682,0.00013685926,0.000019158711,0.000119454126,0.000049115242],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012408831,0.000018841429,0.0023354145,0.0000032497244,0.00006143528,0.0000019580498,0.00016869126,0.9841291,0.000044629924,0.0074128546,0.0017779411,0.0040335055],"study_design_scores_gemma":[0.00034498953,0.00005519061,0.0007064976,0.00001360037,0.0000147875235,0.00000956535,0.000010571516,0.93446606,0.0024940304,0.0020186114,0.05954571,0.00032039493],"about_ca_topic_score_codex":0.00003407249,"about_ca_topic_score_gemma":0.00006266332,"teacher_disagreement_score":0.6600999,"about_ca_system_score_codex":0.00037721748,"about_ca_system_score_gemma":0.000011785472,"threshold_uncertainty_score":0.8295776},"labels":[],"label_agreement":null},{"id":"W1989128939","doi":"10.1016/j.enpol.2010.07.027","title":"Power sector reform in Maharashtra, India","year":2010,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Power; Canada Excellence Research Chairs, Government of Canada","keywords":"Tariff; Restructuring; Scope (computer science); Electricity; Context (archaeology); Business; Electric power industry; Electric power distribution; Distribution (mathematics); Scarcity; Mains electricity; Industrial organization; Economics; Finance; Power (physics); Engineering; Market economy; International trade","score_opus":0.002459259940806522,"score_gpt":0.1893973282938608,"score_spread":0.18693806835305427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1989128939","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42894152,0.00013973829,0.0023132104,0.00017528833,0.0012660044,0.000090048765,0.00000788283,0.0005598288,0.56650645],"genre_scores_gemma":[0.9980564,0.000020907557,0.00033201222,0.000113287504,0.00028285163,0.000021740947,0.000009402598,0.000042911473,0.0011204887],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992917,0.000011176372,0.0001817416,0.00011553498,0.00009883361,0.00030098844],"domain_scores_gemma":[0.99964195,0.000012223975,0.000021022362,0.00023747193,0.000013482912,0.00007382528],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007149929,0.000120943696,0.000119167395,0.00037880824,0.000017359534,0.000020994827,0.00014461338,0.00014137929,0.00015479284],"category_scores_gemma":[0.00002355259,0.00012198811,0.000027845139,0.00057344604,0.000010508591,0.00012483107,0.00001443166,0.0001918265,0.000049527476],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003084097,0.00021018977,0.010065593,0.0001343452,0.00017920666,0.00010979186,0.0040760487,0.05863393,0.14190279,0.75028086,0.014516311,0.019860115],"study_design_scores_gemma":[0.003783842,0.00022240356,0.18370269,0.00013688505,0.000018903665,0.0002485631,0.000111852765,0.09435813,0.141813,0.004039249,0.56866604,0.002898432],"about_ca_topic_score_codex":0.0011023423,"about_ca_topic_score_gemma":0.00074649503,"teacher_disagreement_score":0.74624157,"about_ca_system_score_codex":0.00024820265,"about_ca_system_score_gemma":0.0000468205,"threshold_uncertainty_score":0.49745306},"labels":[],"label_agreement":null},{"id":"W1989206067","doi":"10.1109/ccece.2007.324","title":"Transmission Loss Recovery In A Deregulated Power System Network - A Practical Example","year":2007,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Alberta Energy","funders":"","keywords":"Operator (biology); Electric power system; Generator (circuit theory); Transmission network; Transmission system; Transmission loss; Computer science; Transmission (telecommunications); Structuring; Reliability engineering; Electric power; Power (physics); Telecommunications; Engineering; Economics","score_opus":0.008116690970489176,"score_gpt":0.21560721260364574,"score_spread":0.20749052163315657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1989206067","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028872818,0.00031770067,0.9388549,0.000026907632,0.00035457645,0.00030383107,3.4579077e-7,0.00065114815,0.030617781],"genre_scores_gemma":[0.9804669,0.0000143299185,0.019189736,0.000019612098,0.000051524825,0.000007740724,0.000008239172,0.000041610405,0.00020031934],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987362,0.000048051472,0.0004129917,0.00018154453,0.00017246434,0.00044875554],"domain_scores_gemma":[0.9994896,0.00016679465,0.000030259236,0.00018269429,0.000029153869,0.00010150053],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00070723286,0.00014361851,0.00019540635,0.00013368347,0.000028277973,0.000027168151,0.00006558197,0.00018176959,0.00008737964],"category_scores_gemma":[0.000015838063,0.0001366128,0.00003847009,0.0007123802,0.000006692286,0.00020313464,0.000007383256,0.00016105508,0.00003790514],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030817,0.00012775497,0.0027101224,0.0005625063,0.00013558335,0.0005872434,0.000730298,0.96273714,0.001970782,0.0074205794,0.0151492385,0.007560595],"study_design_scores_gemma":[0.0018519658,0.00017916926,0.0068322495,0.0007613947,0.00003556962,0.00059662946,0.0002672917,0.968116,0.0037776907,0.000112477326,0.016613519,0.00085604424],"about_ca_topic_score_codex":0.000076258875,"about_ca_topic_score_gemma":0.00006843731,"teacher_disagreement_score":0.95159405,"about_ca_system_score_codex":0.00028457737,"about_ca_system_score_gemma":0.000026349899,"threshold_uncertainty_score":0.5570908},"labels":[],"label_agreement":null},{"id":"W1991053377","doi":"10.1109/tpwrs.2014.2360369","title":"A Fully Decentralized Approach for Solving the Economic Dispatch Problem","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":162,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Economic dispatch; Mathematical optimization; Computer science; Nondeterministic algorithm; Flooding (psychology); Electric power system; Power (physics); Mathematics; Algorithm","score_opus":0.006813465047826147,"score_gpt":0.1927440587862599,"score_spread":0.18593059373843374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1991053377","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0009355586,0.00017507863,0.9900269,0.000038516177,0.0026430117,0.0015826415,0.00003355916,0.00050113216,0.0040636295],"genre_scores_gemma":[0.995688,0.00002761849,0.0025706182,0.000020151298,0.000038141734,0.0010129189,0.000007879593,0.000093500865,0.0005411315],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985547,0.00008055506,0.0004703107,0.00029449712,0.00015678299,0.00044313696],"domain_scores_gemma":[0.9991446,0.00018231342,0.00008039949,0.0004558133,0.00004550674,0.00009136127],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048663563,0.00025894545,0.000309561,0.0001235897,0.00022088396,0.00016303008,0.00027460264,0.00013745738,0.000015697531],"category_scores_gemma":[0.0000034956795,0.00020933131,0.00015593582,0.00016962201,0.00002140096,0.00017127182,6.4736156e-7,0.00017997697,0.000056573448],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018692086,0.000026086986,0.000006695552,0.00015971833,0.00011358239,1.2394197e-7,0.00038555983,0.9959628,0.00037967894,0.00046542054,0.0021374838,0.00034416976],"study_design_scores_gemma":[0.00067770656,0.000085598964,0.000005140439,0.000054286655,0.000052344596,0.000023638037,0.000087665685,0.98675007,0.0013986861,0.00001267189,0.010579666,0.00027255557],"about_ca_topic_score_codex":0.00005829932,"about_ca_topic_score_gemma":0.000022484988,"teacher_disagreement_score":0.99475247,"about_ca_system_score_codex":0.00036936722,"about_ca_system_score_gemma":0.000038631595,"threshold_uncertainty_score":0.8536283},"labels":[],"label_agreement":null},{"id":"W1992605262","doi":"10.1109/tsg.2013.2286623","title":"Equilibrium in Wholesale Energy Markets: Perturbation Analysis in the Presence of Renewables","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Electric Power System Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Alberta Energy","funders":"","keywords":"Intermittency; Renewable energy; Smart grid; Karush–Kuhn–Tucker conditions; Wind power; Demand response; Grid; Energy market; Market integration; Mathematical optimization; Computer science; Economics; Econometrics; Microeconomics; Electricity; Mathematics; Engineering; Electrical engineering; Physics","score_opus":0.005860551682648118,"score_gpt":0.19058193884294689,"score_spread":0.18472138716029876,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1992605262","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058184408,0.00008574581,0.937995,0.0000960974,0.00040571092,0.00012055587,0.000013517567,0.00006435032,0.0030346077],"genre_scores_gemma":[0.9993621,0.00006299469,0.00021267212,0.000021310916,0.000027707554,0.000056666515,0.0000112864755,0.000014682606,0.00023059365],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989544,0.00019608889,0.00032448696,0.00015502631,0.00020042926,0.00016955116],"domain_scores_gemma":[0.9993183,0.00028073986,0.000039973504,0.00030992902,0.000028865776,0.000022187583],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040287274,0.00011232594,0.00019811752,0.00056374003,0.000019472634,0.00001896416,0.0001757195,0.00007497441,0.000022050497],"category_scores_gemma":[0.000012049135,0.00009877836,0.0000763969,0.0017079823,0.00001869534,0.00016431187,5.3219907e-7,0.00009491605,0.0000018177052],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001610644,0.00004031889,0.00039259373,0.000024162384,0.000039914186,6.163215e-7,0.00025021454,0.9966198,0.0008482741,0.00004039252,0.00023787591,0.0014897146],"study_design_scores_gemma":[0.0002430595,0.00003411876,0.0015439958,0.00003901813,0.00005949469,0.0000018532354,0.00005891695,0.9851149,0.012249151,0.000041489075,0.0005008268,0.00011317797],"about_ca_topic_score_codex":0.00035416384,"about_ca_topic_score_gemma":0.0037081721,"teacher_disagreement_score":0.94117767,"about_ca_system_score_codex":0.00011536717,"about_ca_system_score_gemma":0.000014871197,"threshold_uncertainty_score":0.40280646},"labels":[],"label_agreement":null},{"id":"W1992972827","doi":"10.1109/tpwrs.2012.2186155","title":"Fast Heuristics for Transmission-Line Switching","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":155,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Heuristics; Heuristic; Mathematical optimization; Computer science; Line (geometry); Linear programming; Integer programming; Algorithm; Mathematics","score_opus":0.012935029410388594,"score_gpt":0.22774537180671672,"score_spread":0.21481034239632812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1992972827","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00085953233,0.0010675514,0.9877833,0.000023400464,0.007138419,0.0007741483,0.000056727004,0.0006751404,0.0016217863],"genre_scores_gemma":[0.99660903,0.000054606913,0.002146627,0.000019464513,0.0000887066,0.00022712443,0.000006938773,0.00011515943,0.00073232956],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984697,0.00004825481,0.00049885985,0.00019557751,0.00025364957,0.00053394295],"domain_scores_gemma":[0.99917805,0.00015800633,0.00005690277,0.00030849854,0.000076930315,0.00022163628],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003156709,0.00027673453,0.00030720144,0.0002268608,0.00017328557,0.00006185398,0.00014891753,0.00018136077,0.000025397276],"category_scores_gemma":[0.0000043023124,0.0002726129,0.0001405049,0.00031045795,0.000009039452,0.00028209435,2.9043954e-7,0.0002318549,0.00007148249],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003463523,0.00016375058,0.000009675835,0.0002984837,0.00015697832,0.00000133793,0.0013218964,0.9874339,0.005235215,0.000199278,0.0023568375,0.0027880142],"study_design_scores_gemma":[0.0011587428,0.00022411709,0.000013017146,0.00024761542,0.00013608138,0.000093293245,0.00023927071,0.9354877,0.019815885,0.000009054727,0.041848443,0.00072681665],"about_ca_topic_score_codex":0.000012708556,"about_ca_topic_score_gemma":0.0000015081239,"teacher_disagreement_score":0.99574953,"about_ca_system_score_codex":0.00017607985,"about_ca_system_score_gemma":0.000021088337,"threshold_uncertainty_score":0.9999726},"labels":[],"label_agreement":null},{"id":"W1993258694","doi":"10.1109/ccece.2010.5575151","title":"An overview of the operation of the Alberta electricity market","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Electricity; Electricity market; Electricity retailing; Key (lock); Operator (biology); Industrial organization; Electricity generation; Environmental economics; Electricity system; Computer science; Business; Engineering; Electrical engineering; Economics; Power (physics); Computer security","score_opus":0.008079968415305033,"score_gpt":0.22087068445100574,"score_spread":0.2127907160357007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993258694","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79430056,0.00054609455,0.028477423,0.00031779378,0.0017226894,0.0011753074,0.000006588086,0.0001319368,0.17332159],"genre_scores_gemma":[0.9989675,0.00002581238,0.00026934897,0.000025002926,0.00001642821,0.000004386965,7.5260124e-7,0.000009852146,0.00068087404],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952114,0.000051365634,0.00017255388,0.00005867754,0.00011798433,0.000078298624],"domain_scores_gemma":[0.9994777,0.000041173524,0.000041672927,0.00038340862,0.00004289573,0.00001315195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017054037,0.000057795743,0.00008422922,0.000019950185,0.000025659841,0.000007926381,0.00024464758,0.00005234816,0.0002055866],"category_scores_gemma":[0.00005500321,0.000031845553,0.000037707305,0.00031031776,0.000011497245,0.00008892899,0.000013948327,0.00009827837,0.0000013918733],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013652288,0.00015860022,0.03286026,0.00039480653,0.000111971116,8.5650086e-8,0.00076803763,0.1307198,0.7778219,0.038566153,0.012839859,0.0057449047],"study_design_scores_gemma":[0.00012585642,0.000018726749,0.030998735,0.000018576618,0.000016714377,0.000003513097,0.0000043781497,0.7096316,0.25816756,0.000059070073,0.0008765523,0.00007868299],"about_ca_topic_score_codex":0.00029756146,"about_ca_topic_score_gemma":0.0016944226,"teacher_disagreement_score":0.57891184,"about_ca_system_score_codex":0.000013403666,"about_ca_system_score_gemma":0.000022046243,"threshold_uncertainty_score":0.22510292},"labels":[],"label_agreement":null},{"id":"W1996945628","doi":"10.1111/1468-0076.00112","title":"A simple economic analysis of electricity deregulation failure","year":2002,"lang":"en","type":"article","venue":"OPEC Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Deregulation; Confusion; Electricity; Simple (philosophy); Electricity market; Economics; Market economy; Mainstream; Business; Political science; Engineering; Law","score_opus":0.010152164269605319,"score_gpt":0.2155448072654133,"score_spread":0.20539264299580798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1996945628","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028016992,0.7350404,0.18860464,0.0006444698,0.00026524017,0.002537298,0.000057428366,0.00071378134,0.04411973],"genre_scores_gemma":[0.95656353,0.04259849,0.00057402503,0.000054649754,0.000019624385,0.000022938,0.000044288077,0.000018505196,0.000103917046],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993129,0.000036218044,0.00035380112,0.00010882875,0.00007102639,0.00011722834],"domain_scores_gemma":[0.9995962,0.000024850839,0.000083154126,0.00024062209,0.000026448808,0.000028767472],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00013867003,0.000089437715,0.0003908393,0.00015561699,0.000015366391,0.000009830161,0.0000962842,0.000035904282,0.000915568],"category_scores_gemma":[0.000019963496,0.000088642984,0.00012277388,0.0010192385,0.0000040921736,0.000102901846,0.0000061596725,0.00004140455,0.000069682814],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014266997,0.00004741747,0.0037046322,0.0043079956,0.0022662687,0.0000019952606,0.00009747607,0.8007365,0.0005636782,0.0010557936,0.090148434,0.09706836],"study_design_scores_gemma":[0.00007221675,0.000011437269,0.0009173892,0.0001838328,0.00077858,0.0000020533334,7.0944463e-7,0.96502817,0.00024836467,0.0000083346085,0.032611497,0.00013740243],"about_ca_topic_score_codex":0.000018059114,"about_ca_topic_score_gemma":0.000044743338,"teacher_disagreement_score":0.92854655,"about_ca_system_score_codex":0.0001046995,"about_ca_system_score_gemma":0.000005172012,"threshold_uncertainty_score":0.99999774},"labels":[],"label_agreement":null},{"id":"W1997208357","doi":"10.1016/s0840-4704(10)60740-5","title":"What's Old is New Again: <i>Change at VON Means Return to Core Values</i>","year":2000,"lang":"en","type":"article","venue":"Healthcare Management Forum","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CARE Canada","funders":"","keywords":"Core (optical fiber); Business; Computer science; Telecommunications","score_opus":0.025041464237228434,"score_gpt":0.2529111098440196,"score_spread":0.22786964560679115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1997208357","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0799034,0.060251225,0.07352159,0.44147536,0.030157596,0.033362158,0.00027058483,0.0144503815,0.2666077],"genre_scores_gemma":[0.56148267,0.03354221,0.008584822,0.09819099,0.0015876335,0.0010652259,0.0004768341,0.00070312014,0.2943665],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99774885,0.000037704533,0.000426718,0.0004564946,0.00045059845,0.0008796338],"domain_scores_gemma":[0.9988423,0.000015413716,0.000047558755,0.00068831036,0.000040339204,0.00036608966],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00019924912,0.0003078327,0.00028471331,0.00022841888,0.00015963282,0.0001239257,0.00030316052,0.0001382873,0.0005215838],"category_scores_gemma":[0.0000031802874,0.0003445385,0.00008595033,0.0007400649,0.000007823543,0.00047273166,0.00009537943,0.00015774043,0.00083394826],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043646956,0.000022311438,0.0008508118,0.00083515054,0.00010464769,0.00004836767,0.0035621906,0.0051564067,0.000010916842,0.0009568003,0.6576911,0.33071762],"study_design_scores_gemma":[0.000723429,0.00021682208,0.00061860017,0.00070682203,0.00004919833,0.000013388072,0.0006943962,0.030312538,0.0002376207,0.00047287496,0.96526766,0.00068663375],"about_ca_topic_score_codex":0.000348663,"about_ca_topic_score_gemma":0.000669744,"teacher_disagreement_score":0.48157924,"about_ca_system_score_codex":0.0006515507,"about_ca_system_score_gemma":0.000011576052,"threshold_uncertainty_score":0.99994403},"labels":[],"label_agreement":null},{"id":"W1998397026","doi":"10.3138/infor.48.4.261","title":"An Adaptive Learning Game Model for Interacting Electric Power Markets","year":2010,"lang":"en","type":"article","venue":"INFOR Information Systems and Operational Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Oligopoly; Microeconomics; Variable pricing; Profit (economics); Interconnection; Economics; Nash equilibrium; Competition (biology); Order (exchange); Adaptive learning; Computer science; Mathematical optimization; Cournot competition; Mathematics; Artificial intelligence; Telecommunications","score_opus":0.025556508725074988,"score_gpt":0.3108355403238141,"score_spread":0.28527903159873913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1998397026","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21955498,0.00010945076,0.7580068,0.000047479178,0.0006921884,0.0018349114,0.00003678651,0.00028672055,0.01943065],"genre_scores_gemma":[0.9971663,0.000017081113,0.0018751658,0.000020297563,0.00009873019,0.00034959576,0.00012018986,0.000020711377,0.00033192543],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983903,0.0000590723,0.00052912557,0.000116384785,0.0005432223,0.00036187866],"domain_scores_gemma":[0.9982017,0.0003489239,0.00006906683,0.00014686603,0.0010998559,0.00013353486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020445478,0.00013657876,0.00015071075,0.0005243419,0.000328327,0.0007440745,0.00015120504,0.00015238114,0.00002021539],"category_scores_gemma":[0.0005181118,0.00013124646,0.00002799742,0.00031824244,0.000020714793,0.0036432396,0.00002229919,0.00058424514,0.00003995154],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000082426544,0.0000089818695,0.0001326008,0.000107519874,0.00002917058,2.1230588e-7,0.002697169,0.9679947,0.0029477912,0.020930883,0.001243539,0.0038250426],"study_design_scores_gemma":[0.0003260658,0.00012120866,0.00016536447,0.000028675457,0.0000020319196,0.000022016577,0.00052139757,0.98812014,0.00022389779,0.00002223451,0.010296921,0.00015007595],"about_ca_topic_score_codex":0.000024911456,"about_ca_topic_score_gemma":0.000007244342,"teacher_disagreement_score":0.7776113,"about_ca_system_score_codex":0.0001089282,"about_ca_system_score_gemma":0.0001576911,"threshold_uncertainty_score":0.7175128},"labels":[],"label_agreement":null},{"id":"W2000048570","doi":"10.1016/j.desal.2003.12.007","title":"Energy and exergy use in the utility sector of Saudi Arabia","year":2004,"lang":"en","type":"article","venue":"Desalination","topic":"Electric Power System Optimization","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Exergy; Waste management; Energy sector; Environmental science; Engineering; Environmental engineering; Economics; Environmental economics","score_opus":0.012831313227765706,"score_gpt":0.19898863559295848,"score_spread":0.18615732236519278,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000048570","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7744121,0.0002864092,0.22395284,0.000040980154,0.00009581278,0.00009932113,0.0000029365904,0.00005746497,0.0010521496],"genre_scores_gemma":[0.9993622,0.000049849736,0.00052405323,0.0000139983185,0.00001216514,0.000009912915,0.000011448088,0.0000073201168,0.000009059228],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959725,0.000035473186,0.00013993209,0.00006595566,0.0000913886,0.00007000847],"domain_scores_gemma":[0.9997913,0.000045854285,0.000025762081,0.000097103584,0.000029798925,0.000010137201],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016410452,0.00005055516,0.00006634488,0.00007558899,0.00001180764,0.000014168224,0.00004420377,0.000045094792,0.0000029288162],"category_scores_gemma":[0.000035712827,0.00004375686,0.000010561217,0.00024859735,0.000009548227,0.00014172374,0.0000038356848,0.000031635693,3.4729666e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007297631,0.0004031216,0.03821796,0.0006467601,0.00010163682,0.000023349075,0.010741627,0.7445402,0.027443249,0.121092014,0.0014458536,0.055271246],"study_design_scores_gemma":[0.0016002302,0.000097274016,0.30433092,0.0001264201,0.000023410039,0.000025870984,0.00010683025,0.65247834,0.03394807,0.0052826228,0.0016541571,0.00032588118],"about_ca_topic_score_codex":0.00021550796,"about_ca_topic_score_gemma":0.0004570422,"teacher_disagreement_score":0.26611295,"about_ca_system_score_codex":0.000053969212,"about_ca_system_score_gemma":0.000007684461,"threshold_uncertainty_score":0.1784353},"labels":[],"label_agreement":null},{"id":"W2000653477","doi":"","title":"Hydro Québec's distribution vision","year":2009,"lang":"en","type":"article","venue":"Electricity Distribution - Part 2, 2009. CIRED 2009. The 20th International Conference and Exhibition on","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Distribution (mathematics); Environmental science; Computer science; Mathematics","score_opus":0.012597498210477197,"score_gpt":0.23834832943277984,"score_spread":0.22575083122230263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000653477","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45475945,0.0028167982,0.48192155,0.019019298,0.0029860595,0.0023945987,0.007908115,0.0024823283,0.025711818],"genre_scores_gemma":[0.991609,0.0009189525,0.00001723424,0.00039022198,0.00033021063,0.000037955695,0.006059556,0.000021059066,0.0006158327],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99762076,0.00013318853,0.0006273168,0.00045598013,0.00064345903,0.0005192774],"domain_scores_gemma":[0.99890304,0.000091537,0.0001984687,0.0003212322,0.00032870076,0.00015703499],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037330858,0.00038169287,0.0003023998,0.00013933043,0.00039616498,0.00026176244,0.00033048322,0.00022364098,0.00018724124],"category_scores_gemma":[0.0001574896,0.00033877153,0.00011829015,0.00061728683,0.00006523683,0.00051231164,0.00002450467,0.0004592481,0.000118539],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007870848,0.0016635464,0.0010204772,0.00008350406,0.00041073692,0.00004433128,0.00047478548,0.035320994,0.020175114,0.119374305,0.6398511,0.18079406],"study_design_scores_gemma":[0.0034938632,0.0020388337,0.029796395,0.00059656356,0.00017531232,0.00021779587,0.00013428809,0.7094296,0.030316029,0.006026838,0.21580991,0.0019645824],"about_ca_topic_score_codex":0.00020340574,"about_ca_topic_score_gemma":0.00014148247,"teacher_disagreement_score":0.6741086,"about_ca_system_score_codex":0.0007849247,"about_ca_system_score_gemma":0.000106638574,"threshold_uncertainty_score":0.9999064},"labels":[],"label_agreement":null},{"id":"W2003657011","doi":"10.1109/pes.2006.1709558","title":"International power engineering research collaborations","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"","keywords":"George (robot); Renewable energy; Power engineering; Power (physics); Engineering; Key (lock); Panel discussion; Engineering management; Telecommunications; Electrical engineering; Electric power system; Computer science; Business; Computer security","score_opus":0.01013856854834664,"score_gpt":0.2354843770574615,"score_spread":0.22534580850911487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2003657011","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42918068,0.0032335853,0.49481815,0.00055186835,0.014509601,0.0013287248,0.0001536612,0.0057108104,0.050512914],"genre_scores_gemma":[0.94683677,0.00008005042,0.050493736,0.0000284539,0.0011611405,0.00013095373,0.000072668234,0.00022641355,0.0009698376],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970655,0.000044594275,0.0006519744,0.0004452163,0.0007920797,0.0010006236],"domain_scores_gemma":[0.9987968,0.00019065905,0.00006216171,0.0003910251,0.00041895141,0.00014040965],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010632405,0.00041307992,0.000311083,0.00032326274,0.00019601568,0.0002728918,0.00043730563,0.00028894428,0.00006567233],"category_scores_gemma":[0.00012905094,0.0005025279,0.00020382476,0.0015367197,0.00002938691,0.00039142335,0.000058057594,0.00065126905,0.00006684056],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013528655,0.000022135955,0.0001810403,0.000038509683,0.00008217634,0.000005246058,0.0002482651,0.8298817,0.1274898,0.0006301521,0.04139422,0.000025349782],"study_design_scores_gemma":[0.00039404648,0.000025363852,0.00041422798,0.00011667178,0.000014557287,0.00001936103,0.0000708187,0.9199503,0.021697113,0.0000102558015,0.056672327,0.0006149233],"about_ca_topic_score_codex":0.0000698563,"about_ca_topic_score_gemma":0.000006316847,"teacher_disagreement_score":0.517656,"about_ca_system_score_codex":0.0007297833,"about_ca_system_score_gemma":0.000055827022,"threshold_uncertainty_score":0.9997426},"labels":[],"label_agreement":null},{"id":"W2003683056","doi":"10.1016/j.energy.2005.02.018","title":"Electricity deregulation, spot price patterns and demand-side management","year":2005,"lang":"en","type":"article","venue":"Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"University of Alberta","keywords":"Volatility (finance); Spot contract; Deregulation; Economics; Electricity; Consumption (sociology); Econometrics; Monetary economics; Financial economics; Macroeconomics; Futures contract","score_opus":0.0030897695532289032,"score_gpt":0.17047399629182772,"score_spread":0.16738422673859882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2003683056","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07441239,0.00090845977,0.9041076,0.0000792859,0.000099614634,0.000079774734,9.1688776e-7,0.00031676912,0.01999522],"genre_scores_gemma":[0.9961215,0.0003428145,0.0024013459,0.000072304836,0.00009938452,0.000016770211,0.000009704141,0.000022450145,0.0009136947],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994168,0.000017018121,0.00014893807,0.00012804435,0.00010499914,0.00018415056],"domain_scores_gemma":[0.9997742,0.000016342667,0.00002232162,0.00012527034,0.000016167838,0.00004565358],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000066187444,0.000098478966,0.000086809145,0.00010411942,0.000037296246,0.000025121035,0.000059585338,0.00004273182,0.000024052664],"category_scores_gemma":[0.0000031813615,0.00010579129,0.000014661401,0.00019372688,0.0000034933098,0.00011316236,0.000014568022,0.00003505594,0.0000071772924],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000069628545,0.000035269975,0.002745346,0.00011081911,0.00014206971,0.000011325611,0.00018159265,0.85139275,0.00085115986,0.018490262,0.0042588273,0.12177362],"study_design_scores_gemma":[0.00061707693,0.000027724895,0.04050639,0.000040428597,0.000037995887,0.000037011443,0.000010279574,0.873251,0.020260653,0.00028706153,0.06449544,0.00042892955],"about_ca_topic_score_codex":0.000026309628,"about_ca_topic_score_gemma":0.00007362461,"teacher_disagreement_score":0.9217091,"about_ca_system_score_codex":0.00008686131,"about_ca_system_score_gemma":0.0000033215576,"threshold_uncertainty_score":0.43140435},"labels":[],"label_agreement":null},{"id":"W2004531005","doi":"10.1109/tpwrs.2002.1008372","title":"Closure to discussion of \"z-bus loss allocation\"","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Closure (psychology); Computer science; Operations research; Engineering; Economics","score_opus":0.009031565387675721,"score_gpt":0.19659365069461435,"score_spread":0.18756208530693863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2004531005","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005099495,0.00025181094,0.9861848,0.00015659144,0.0033467093,0.0005767512,0.00003724217,0.00038609226,0.0039605475],"genre_scores_gemma":[0.99677914,0.000041098687,0.00023103741,0.000018650471,0.000018130846,0.00010915731,0.000002141805,0.0000606883,0.002739942],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99858385,0.000063016676,0.0005065042,0.00023047387,0.00034995255,0.00026619362],"domain_scores_gemma":[0.9991976,0.000041781932,0.000060942777,0.00046217747,0.000103161154,0.00013436002],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014028931,0.00021246483,0.00028511873,0.0003286111,0.00007241888,0.000034598103,0.00018633826,0.00014383746,0.00014135409],"category_scores_gemma":[0.000004139966,0.00017225703,0.0000973094,0.00073096144,0.000016034835,0.00016827672,5.9094083e-7,0.00015854089,0.00031709223],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001075813,0.00011575015,0.000035631143,0.00014625666,0.000090234884,0.0000037928146,0.0013294369,0.9893051,0.0033405484,0.0000760355,0.0048880028,0.00065848697],"study_design_scores_gemma":[0.0026811047,0.0012262487,0.00034791423,0.0016929882,0.00022682453,0.0002498798,0.0008785091,0.8430889,0.09988401,0.000015423242,0.047581833,0.0021263373],"about_ca_topic_score_codex":0.000024485442,"about_ca_topic_score_gemma":0.000009720226,"teacher_disagreement_score":0.99167967,"about_ca_system_score_codex":0.00015691147,"about_ca_system_score_gemma":0.000009266356,"threshold_uncertainty_score":0.7024438},"labels":[],"label_agreement":null},{"id":"W2005520311","doi":"10.1109/epec.2011.6070189","title":"Novel constrained search-tactic for optimal dynamic economic dispatch using modern meta-heuristic optimization algorithms","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Mathematical optimization; Computer science; Heuristic; Economic dispatch; Optimization problem; Maxima and minima; Algorithm; Mathematics; Electric power system; Power (physics)","score_opus":0.05662815491312447,"score_gpt":0.255235313737485,"score_spread":0.1986071588243605,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005520311","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028283994,0.00015217272,0.9936736,0.000010047285,0.00038472144,0.00075345737,0.0000764528,0.00043650877,0.0016846146],"genre_scores_gemma":[0.5267064,0.000012910872,0.4729476,0.0000073505075,0.000026154408,0.00006062117,0.000050316306,0.00007673267,0.000111886395],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985684,0.000026454385,0.0004626451,0.00034184766,0.00012376548,0.00047685124],"domain_scores_gemma":[0.999327,0.00009698021,0.000076732926,0.00028627273,0.00008804106,0.00012498279],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00026531267,0.00029420722,0.00041556905,0.00020696876,0.0000934749,0.00006661272,0.00019127253,0.00013389447,0.0002619365],"category_scores_gemma":[0.000028067236,0.0002956987,0.00015655943,0.00015199401,0.000038550043,0.00040999695,0.00002573869,0.00011573301,0.000013572918],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001304601,0.000029995888,0.000011776896,0.00006837584,0.00053204765,0.0000012071482,0.0001916796,0.99750894,0.00095260644,0.00032375866,0.000016135822,0.00035044248],"study_design_scores_gemma":[0.0006230333,0.000051949395,0.000012594742,0.000009819573,0.0005109448,0.00004550127,0.000036238307,0.9973094,0.0010195503,0.000047386508,0.000004395008,0.00032921165],"about_ca_topic_score_codex":0.00013784636,"about_ca_topic_score_gemma":0.000020204447,"teacher_disagreement_score":0.52387804,"about_ca_system_score_codex":0.00038039603,"about_ca_system_score_gemma":0.00008983751,"threshold_uncertainty_score":0.9999495},"labels":[],"label_agreement":null},{"id":"W2006900625","doi":"10.1109/pesmg.2013.6672570","title":"A novel market simulation methodology on hydro storage","year":2013,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bidding; Economic dispatch; Electricity market; Computer science; Power system simulation; Production (economics); Energy storage; Hydroelectricity; Energy market; Environmental economics; Operations research; Electricity; Reliability engineering; Electric power system; Economics; Microeconomics; Engineering; Electrical engineering","score_opus":0.03192424632170907,"score_gpt":0.2542517156168132,"score_spread":0.22232746929510414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2006900625","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008857982,0.000022567407,0.9044176,0.000037814425,0.00026747893,0.00022295731,7.186353e-7,0.0003899097,0.08578302],"genre_scores_gemma":[0.95907915,0.000002527103,0.038265254,0.000086045744,0.00004402131,0.000028119137,0.0000040122554,0.000025566807,0.0024653205],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945366,0.000051134022,0.00014697076,0.00010873676,0.00008460392,0.00015491211],"domain_scores_gemma":[0.9994199,0.0003326997,0.000019015362,0.00016021763,0.000030523704,0.000037609298],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00019155168,0.000091433096,0.000111147274,0.00010477833,0.00001800987,0.000019724152,0.000063921645,0.00007957738,0.0010642635],"category_scores_gemma":[0.000086444445,0.00008531477,0.000022371094,0.00016301134,0.00000435058,0.0001261675,0.0000071841737,0.000070974376,0.00026300745],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000021942806,0.000008895541,0.000020299098,0.000010698554,0.000013997421,2.795202e-7,0.000043235552,0.98727477,0.0048285197,0.00025276933,0.0052187406,0.0023255975],"study_design_scores_gemma":[0.00016321836,0.00002527835,0.0008072655,0.000004928823,0.0000036130316,0.0000023871935,0.000005702547,0.99682754,0.0009831585,0.00006521429,0.0010145224,0.00009714481],"about_ca_topic_score_codex":0.000035204535,"about_ca_topic_score_gemma":0.0000040525674,"teacher_disagreement_score":0.9502212,"about_ca_system_score_codex":0.000071103255,"about_ca_system_score_gemma":0.0000043211157,"threshold_uncertainty_score":0.9998489},"labels":[],"label_agreement":null},{"id":"W2010392324","doi":"10.1016/j.enpol.2011.03.008","title":"Characteristics of the prices of operating reserves and regulation services in competitive electricity markets","year":2011,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Volatility (finance); Electricity; Economics; Predictability; Monetary economics; Electricity market; Agricultural economics; Business; Econometrics","score_opus":0.0061379765347969704,"score_gpt":0.18881686392320177,"score_spread":0.1826788873884048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2010392324","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98680884,0.00015289233,0.00072895444,0.000011867455,0.000036180634,0.000056448673,0.000004192871,0.000019950216,0.012180657],"genre_scores_gemma":[0.9993551,0.00010213066,0.00043936522,0.000006452008,0.000027630818,0.0000045316583,0.000003261984,0.000010071245,0.000051452666],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994676,0.000055607245,0.00023438643,0.00006678528,0.00007633633,0.00009929096],"domain_scores_gemma":[0.9996893,0.000037482983,0.00009936878,0.00011523742,0.000044365544,0.000014252792],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000114768336,0.00006668622,0.00012815771,0.00013183322,0.000018053675,0.000005568214,0.00009910455,0.00004424489,0.0000050649796],"category_scores_gemma":[0.00003459947,0.000055552748,0.000013493031,0.000428279,0.000018022118,0.00009965444,0.000027964626,0.00004047002,8.46746e-8],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010169398,0.00019983258,0.54224026,0.0019561818,0.00020299881,0.0000025636102,0.018813808,0.016535226,0.09661244,0.31036478,0.000049201994,0.012921018],"study_design_scores_gemma":[0.00011793455,0.000017529512,0.88490105,0.00010971626,0.000004651905,0.0000016244388,0.000029110393,0.057301465,0.0573026,0.000109379725,0.000043165408,0.00006178494],"about_ca_topic_score_codex":0.0014168534,"about_ca_topic_score_gemma":0.00027016408,"teacher_disagreement_score":0.34266078,"about_ca_system_score_codex":0.00002767548,"about_ca_system_score_gemma":0.000021194108,"threshold_uncertainty_score":0.22653753},"labels":[],"label_agreement":null},{"id":"W2010879375","doi":"10.1016/j.eneco.2004.12.004","title":"Governance of electricity transmission systems","year":2005,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Natural monopoly; Corporate governance; Electricity; Operator (biology); Industrial organization; Profit (economics); Monopoly; Electricity system; Economics; Transmission system; Business; Microeconomics; Transmission (telecommunications); Operations research; Computer science; Electricity generation; Finance; Engineering; Telecommunications","score_opus":0.003216012089685772,"score_gpt":0.15238361377786738,"score_spread":0.1491676016881816,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2010879375","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16652408,0.008693288,0.78253615,0.000052708474,0.00063831423,0.00010935055,0.000011852356,0.00029174512,0.0411425],"genre_scores_gemma":[0.99645144,0.0018011082,0.0009418341,0.000008823789,0.00010575554,0.0000072273515,0.0000050269477,0.000024588786,0.00065417704],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994556,0.00001012481,0.0002665519,0.0000956962,0.0000332614,0.00013879061],"domain_scores_gemma":[0.9997348,0.000018078814,0.00006232036,0.00013611179,0.000015054692,0.000033601787],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000638363,0.00008732187,0.00015763898,0.000038865346,0.000013960993,0.000014568337,0.0001042521,0.000068574154,0.000009532122],"category_scores_gemma":[0.0000028043844,0.00009889034,0.000034672463,0.0000941533,0.000005342625,0.00019517112,0.000003788804,0.000041189545,0.000002929923],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000034784514,0.000009751323,0.00009847384,0.000022288874,0.000020935684,1.5682262e-7,0.000024153196,0.9703409,0.0008022795,0.010401119,0.0005652542,0.017711222],"study_design_scores_gemma":[0.00013720956,0.00001188077,0.000036951053,0.00001149808,0.0000041499056,0.000004044,0.000001494951,0.8832368,0.028005663,0.000017299044,0.08843576,0.00009720449],"about_ca_topic_score_codex":0.000044974575,"about_ca_topic_score_gemma":0.000017190265,"teacher_disagreement_score":0.8299274,"about_ca_system_score_codex":0.0001830621,"about_ca_system_score_gemma":0.000015223126,"threshold_uncertainty_score":0.40326312},"labels":[],"label_agreement":null},{"id":"W2011019406","doi":"10.1109/nabic.2013.6617874","title":"A novel application of ACO to price transmission rights in electricity markets","year":2013,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Electricity market; Electricity; Volatility (finance); Hedge; Business; Economics; Electricity retailing; Microeconomics; Econometrics; Engineering","score_opus":0.0029780007330158695,"score_gpt":0.18362255980515355,"score_spread":0.18064455907213767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2011019406","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06667556,0.000035721718,0.91476005,0.000042150685,0.000022973838,0.0006580525,4.384906e-7,0.00012377527,0.017681262],"genre_scores_gemma":[0.97985435,0.0000048575594,0.019836409,0.000015400457,0.000008625998,0.00010429058,0.000002972146,0.000010794017,0.00016231326],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99933076,0.000012288761,0.000248421,0.00012399761,0.000118003954,0.00016652099],"domain_scores_gemma":[0.9996941,0.000035133024,0.000023141702,0.00013947251,0.000049720544,0.00005839867],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010946039,0.00008619491,0.00012421822,0.00019379114,0.000011208187,0.000008239799,0.00010366932,0.000067479625,0.000050853872],"category_scores_gemma":[0.000007938957,0.000077377335,0.00001786949,0.00078565057,0.000002373608,0.00012831241,0.0000050689355,0.00005999205,0.000040035127],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020498534,0.0001676972,0.0007067079,0.0001801464,0.000021601556,3.0823117e-7,0.0003838746,0.070947304,0.8862426,0.0015015228,0.0023779208,0.037449807],"study_design_scores_gemma":[0.00032196796,0.000028744511,0.016507424,0.00002684973,0.0000034293737,0.0000026625034,0.0000025291736,0.8806589,0.10005318,0.000108612985,0.0021318311,0.00015384002],"about_ca_topic_score_codex":0.00044497143,"about_ca_topic_score_gemma":0.000024938005,"teacher_disagreement_score":0.9131788,"about_ca_system_score_codex":0.00008949388,"about_ca_system_score_gemma":0.000008191933,"threshold_uncertainty_score":0.3155356},"labels":[],"label_agreement":null},{"id":"W2015533199","doi":"10.1109/epec.2011.6070190","title":"Multi-objective short-term hydro-thermal scheduling using bacterial foraging algorithm","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Foraging; Mathematical optimization; Scheduling (production processes); Computer science; Job shop scheduling; Optimization problem; Term (time); Minification; Algorithm; Mathematics; Ecology; Schedule; Biology","score_opus":0.026151161165590714,"score_gpt":0.23245962574863868,"score_spread":0.20630846458304797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2015533199","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3227286,0.000056256387,0.6728052,4.984022e-7,0.0007307962,0.00019022607,0.0000023980476,0.00046937418,0.0030166896],"genre_scores_gemma":[0.631272,0.000003284059,0.36847565,0.0000044717167,0.0001430617,0.000009692724,0.000006681044,0.000056026365,0.000029104445],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988956,0.000032529188,0.00030208725,0.0002352792,0.00013017435,0.00040433634],"domain_scores_gemma":[0.9996009,0.000016482934,0.000032830503,0.00020650838,0.00005607466,0.00008724166],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015043435,0.00022114527,0.00021358178,0.00016227477,0.00008414466,0.000050494556,0.0001436486,0.00011793883,0.00017582775],"category_scores_gemma":[0.000010780767,0.00023228856,0.00006369038,0.00023417581,0.000016387268,0.00043840703,0.00003642743,0.00014979712,0.000025830599],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050733994,0.0002179952,0.010155423,0.00018853579,0.0006693692,0.00011666699,0.009629151,0.24790303,0.6531685,0.00009010791,0.000030647047,0.07777984],"study_design_scores_gemma":[0.00032322263,0.000018238372,0.0009285371,0.000036686477,0.000026102762,0.000026566635,0.00006533155,0.9489426,0.04933531,0.0000033054682,0.000009166034,0.00028491108],"about_ca_topic_score_codex":0.000069689566,"about_ca_topic_score_gemma":0.000009954335,"teacher_disagreement_score":0.7010396,"about_ca_system_score_codex":0.00018300345,"about_ca_system_score_gemma":0.000025479201,"threshold_uncertainty_score":0.94724524},"labels":[],"label_agreement":null},{"id":"W2015748770","doi":"10.1049/iet-gtd.2013.0766","title":"Fast security and risk constrained probabilistic unit commitment method using triangular approximate distribution model of wind generators","year":2014,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Power system simulation; Probabilistic logic; Wind power; Mathematical optimization; Computer science; Unit (ring theory); Reliability engineering; Mathematics; Engineering; Electrical engineering; Electric power system; Artificial intelligence; Physics; Power (physics)","score_opus":0.017285788508731442,"score_gpt":0.23857750793710508,"score_spread":0.22129171942837364,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2015748770","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2538771,0.00020440803,0.74417835,0.000023378936,0.0001166069,0.00056301494,0.0008674396,0.00013990847,0.00002978769],"genre_scores_gemma":[0.9742143,0.00016494429,0.021262536,0.0000052433943,0.00008716077,0.000027744189,0.0041993707,0.000033334534,0.000005342007],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99777174,0.00045822817,0.00074528,0.00037389135,0.00034398728,0.00030687664],"domain_scores_gemma":[0.99901515,0.00006086889,0.00022702788,0.00027733133,0.00023996257,0.00017963443],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010432912,0.00031748187,0.0004037523,0.000077940764,0.00026365824,0.00007029318,0.00010002275,0.00025195166,0.00001442205],"category_scores_gemma":[0.00008773055,0.0003185501,0.00009347847,0.0004060135,0.000067197725,0.00023885284,0.000012885498,0.00020075683,8.3743e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000271997,0.00006686821,0.0001245733,0.0001758022,0.000052818425,2.7819388e-7,0.00023700036,0.9151443,0.07306687,0.0021641795,0.00013678228,0.008803312],"study_design_scores_gemma":[0.0010685753,0.00006986227,0.00005360623,0.000051847328,0.00018362008,0.000007969117,0.000025109885,0.90386194,0.093573086,0.00060118444,0.0002276905,0.00027549957],"about_ca_topic_score_codex":0.000027630458,"about_ca_topic_score_gemma":0.0000060635393,"teacher_disagreement_score":0.7229158,"about_ca_system_score_codex":0.00022285561,"about_ca_system_score_gemma":0.000072092334,"threshold_uncertainty_score":0.9999267},"labels":[],"label_agreement":null},{"id":"W2016141565","doi":"10.1177/1748006x11419071","title":"Value of stochastic reserve policies in low-carbon power systems","year":2011,"lang":"en","type":"article","venue":"Proceedings of the Institution of Mechanical Engineers Part O Journal of Risk and Reliability","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Pratt and Whitney Canada","keywords":"Reserve requirement; Wind power; Electric power system; Wind generator; Reliability engineering; Environmental economics; Computer science; Power system simulation; Electricity generation; Scheduling (production processes); Environmental science; Business; Power (physics); Operations management; Electrical engineering; Engineering; Economics","score_opus":0.00741985161677194,"score_gpt":0.19234960535860088,"score_spread":0.18492975374182893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2016141565","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9833886,0.00067020673,0.014630382,0.000014820889,0.0007135954,0.00022638033,0.000006881797,0.00001549599,0.000333638],"genre_scores_gemma":[0.9990737,0.00021671921,0.0006725099,8.346221e-7,0.000021132897,0.0000026605655,1.17909316e-7,0.000010315174,0.0000019989473],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983659,0.000025970745,0.0010117658,0.000098745004,0.00034330084,0.00015433265],"domain_scores_gemma":[0.9987687,0.00008702708,0.0005338017,0.00011081609,0.0004304256,0.000069267386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015217118,0.00013434392,0.00045545888,0.00019998716,0.0000199941,0.0000052704463,0.00025501315,0.00014762211,0.0000015220864],"category_scores_gemma":[0.001166745,0.000095242576,0.00011501386,0.00041839806,0.00011078211,0.0001733391,0.000041939835,0.00032422892,6.8252525e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028885834,0.0002609623,0.0052866656,0.0015835643,0.00011660577,6.699382e-7,0.0023362492,0.95630324,0.008144342,0.025569843,0.00004607075,0.000062925355],"study_design_scores_gemma":[0.0030372317,0.001134229,0.014430804,0.005835071,0.00038242262,0.000118323995,0.0016122097,0.8358812,0.13129364,0.005669659,0.000048510872,0.0005567157],"about_ca_topic_score_codex":0.00010857513,"about_ca_topic_score_gemma":0.0000013084448,"teacher_disagreement_score":0.1231493,"about_ca_system_score_codex":0.00009244321,"about_ca_system_score_gemma":0.00004458271,"threshold_uncertainty_score":0.38838798},"labels":[],"label_agreement":null},{"id":"W2016836399","doi":"10.1016/j.energy.2014.01.059","title":"Influence of wind power on hourly electricity prices and GHG (greenhouse gas) emissions: Evidence that congestion matters from Ontario zonal data","year":2014,"lang":"en","type":"article","venue":"Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":60,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université de Sherbrooke; HEC Montréal","funders":"","keywords":"Greenhouse gas; Wind power; Electricity; Environmental science; Economics; Wind speed; Natural resource economics; Production (economics); Econometrics; Meteorology; Microeconomics; Engineering; Geography","score_opus":0.01557452695277647,"score_gpt":0.20874105119433087,"score_spread":0.1931665242415544,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2016836399","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9653547,0.00066324184,0.033345032,0.00009963693,0.00010366981,0.00007100218,0.000014379421,0.00011232748,0.00023602293],"genre_scores_gemma":[0.9985573,0.0002076652,0.00090356823,0.00015477707,0.000032773445,0.0000038309563,0.000041147836,0.000024609411,0.000074287804],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99895597,0.00005823607,0.00022604647,0.00029555152,0.00027287344,0.00019130054],"domain_scores_gemma":[0.9989018,0.00033717245,0.0001314516,0.0005109101,0.00003693282,0.00008175283],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001863904,0.00016128803,0.00019811354,0.00010805969,0.000040683797,0.000036196783,0.0003192822,0.000097087875,0.000027354981],"category_scores_gemma":[0.00015486006,0.00015489662,0.00001600988,0.00017096396,0.00002419077,0.00048173286,0.000059213664,0.00013165007,0.000004169467],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015620182,0.0001018765,0.04534456,0.00009176497,0.00018920592,0.000010015191,0.0010576023,0.90112156,0.031224662,0.00077618146,0.008368996,0.011557355],"study_design_scores_gemma":[0.001955179,0.0010232473,0.56462014,0.003040434,0.00021599393,0.000043713528,0.000037599675,0.33797455,0.060013067,0.0006302579,0.028752912,0.0016929186],"about_ca_topic_score_codex":0.011578787,"about_ca_topic_score_gemma":0.0043206383,"teacher_disagreement_score":0.563147,"about_ca_system_score_codex":0.00011399791,"about_ca_system_score_gemma":0.00004399021,"threshold_uncertainty_score":0.9950032},"labels":[],"label_agreement":null},{"id":"W2016956342","doi":"10.2316/journal.203.2009.3.203-4504","title":"MODELS FOR SECURITY INVESTMENT IN ELECTRICITY MARKET","year":2009,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Investment (military); Incentive; Business; Electricity; Electricity market; Control (management); Public investment; Industrial organization; Market economy; Economics; Economic policy; Engineering","score_opus":0.005102314378856715,"score_gpt":0.20598013100045018,"score_spread":0.20087781662159346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2016956342","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05858742,0.0114715705,0.8627767,0.00043157197,0.0061736465,0.00023697683,0.000024352996,0.000092625996,0.060205154],"genre_scores_gemma":[0.999066,0.00030961234,0.0002267046,0.00010002209,0.00015438511,0.000005269193,0.000002579416,0.000009706936,0.00012572181],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906105,0.000033185843,0.0004517099,0.00007589832,0.00024355689,0.00013462153],"domain_scores_gemma":[0.9995292,0.00004705971,0.00011456222,0.00005223285,0.0001967281,0.000060241615],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032514674,0.00009852519,0.00018920045,0.00029762244,0.000011460179,0.000056686033,0.00015431979,0.000062256564,0.0000033956003],"category_scores_gemma":[0.00002146959,0.000091394926,0.0000515095,0.00010164734,0.000005213647,0.00027268665,0.0000055467954,0.00007656531,1.4549286e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023166045,0.00016357175,0.00040299605,0.0000473384,0.00036033598,0.00007143945,0.0011913723,0.91324574,0.0010426572,0.056927003,0.022901053,0.0034148297],"study_design_scores_gemma":[0.001013325,0.00018455504,0.00035646593,0.00013859483,0.00001008743,0.0002255705,0.000042658437,0.9811074,0.00031084768,0.0058122934,0.010645155,0.00015302995],"about_ca_topic_score_codex":0.000030047566,"about_ca_topic_score_gemma":0.0000053524354,"teacher_disagreement_score":0.94047856,"about_ca_system_score_codex":0.00019328936,"about_ca_system_score_gemma":0.000025462534,"threshold_uncertainty_score":0.37269768},"labels":[],"label_agreement":null},{"id":"W2017416224","doi":"10.2316/journal.201.2007.1.201-1642","title":"APPLICATION OF PARTICLE SWARM OPTIMIZATION ALGORITHM FOR OPTIMAL REACTIVE POWER PLANNING","year":2007,"lang":"en","type":"article","venue":"Control and Intelligent Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Particle swarm optimization; Mathematical optimization; AC power; Minification; Computer science; Linear programming; Multi-swarm optimization; Transformer; Evolutionary programming; Optimization problem; Evolutionary algorithm; Mathematics; Engineering; Voltage","score_opus":0.007258623215638201,"score_gpt":0.22938722407067524,"score_spread":0.22212860085503705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2017416224","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0047654286,0.0021333925,0.9912582,0.00000546687,0.00034739706,0.0009391826,0.0000136628,0.000115663766,0.0004216209],"genre_scores_gemma":[0.99346167,0.000023303217,0.0062236395,0.000006955279,0.000083219915,0.00010860567,0.000017902881,0.000027108019,0.00004761044],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99904,0.000018745593,0.0004475224,0.00015642394,0.00011696601,0.00022034266],"domain_scores_gemma":[0.9993863,0.00014719389,0.000118729964,0.00012573632,0.00015401033,0.00006803725],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047785096,0.00012467447,0.0002338138,0.00008430132,0.00004190438,0.000025430541,0.00006318851,0.00009031618,0.0000013141846],"category_scores_gemma":[0.000025855079,0.00012249497,0.000038959224,0.00014515256,0.000016920263,0.00012681076,0.000005276591,0.00005221013,0.0000021961212],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003845315,0.000020949112,0.0003087006,0.00006702494,0.00007642677,5.1729586e-7,0.00040887273,0.98622316,0.0032218175,0.0006467953,0.00005792025,0.008929334],"study_design_scores_gemma":[0.0004721708,0.00010271271,0.00008533725,0.000043175976,0.000028196939,0.0000074133013,0.00031157534,0.98621875,0.011948165,0.00000398026,0.00065699744,0.00012149866],"about_ca_topic_score_codex":0.00001726284,"about_ca_topic_score_gemma":3.1960428e-7,"teacher_disagreement_score":0.9886962,"about_ca_system_score_codex":0.000070837916,"about_ca_system_score_gemma":0.0000075283065,"threshold_uncertainty_score":0.49951994},"labels":[],"label_agreement":null},{"id":"W2019841235","doi":"10.1109/epec.2010.5697200","title":"Fixed-head hydro-thermal scheduling using a modified bacterial foraging algorithm","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Foraging; Mathematical optimization; Computer science; Scheduling (production processes); Job shop scheduling; Dimension (graph theory); Nonlinear system; Optimization problem; Convergence (economics); Algorithm; Mathematics; Ecology","score_opus":0.01124913720223942,"score_gpt":0.22611204512471403,"score_spread":0.21486290792247462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2019841235","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45449698,0.000020933849,0.53895515,0.0000073477945,0.0013404522,0.00012864168,0.0000020010605,0.00047538223,0.0045731408],"genre_scores_gemma":[0.7668491,0.0000013778671,0.2325773,0.000012004522,0.00042204576,0.000008430955,0.000010763053,0.000057978028,0.000060977778],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989355,0.000018788627,0.00028907656,0.00020011397,0.00015951971,0.00039697127],"domain_scores_gemma":[0.99953806,0.00003056052,0.000038988135,0.00025233527,0.00004495938,0.00009508403],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019376328,0.0001918415,0.00019256315,0.00014362029,0.00009155719,0.00010716461,0.00015227907,0.00015650543,0.00020136914],"category_scores_gemma":[0.000023075863,0.0002016223,0.000055095927,0.0002510836,0.000014199489,0.00033911524,0.000028116216,0.00028767542,0.00003172427],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000051926136,0.000014984608,0.000096663825,0.000032578013,0.00004225986,0.000007059386,0.00016860833,0.43247688,0.54743904,0.00020271241,0.000038275535,0.019475728],"study_design_scores_gemma":[0.0004020343,0.000008771328,0.000037392078,0.00001883737,0.000013727865,0.000030346939,0.000011811051,0.97238344,0.026635513,0.000017999098,0.00019961687,0.00024049614],"about_ca_topic_score_codex":0.00006451035,"about_ca_topic_score_gemma":0.000022508077,"teacher_disagreement_score":0.53990656,"about_ca_system_score_codex":0.000053988704,"about_ca_system_score_gemma":0.000032955093,"threshold_uncertainty_score":0.82219183},"labels":[],"label_agreement":null},{"id":"W2021620876","doi":"10.1109/tste.2012.2225078","title":"Sensitivity-Indices-Based Risk Assessment of Large-Scale Solar PV Investment Projects","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Photovoltaic system; Sensitivity (control systems); Profit (economics); Monte Carlo method; Environmental economics; Solar power; Solar energy; Karush–Kuhn–Tucker conditions; Reliability engineering; Mathematical optimization; Econometrics; Computer science; Microeconomics; Economics; Engineering; Mathematics; Power (physics); Electrical engineering; Electronic engineering; Statistics","score_opus":0.00566346111631379,"score_gpt":0.22336411073170565,"score_spread":0.21770064961539184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2021620876","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019320501,0.00013319791,0.9746162,0.000017547844,0.0004512232,0.00030353016,0.000028923883,0.00030782836,0.0048210314],"genre_scores_gemma":[0.99511474,0.000058615045,0.0034932715,0.00008127958,0.000053965116,0.00015773556,0.000013102559,0.00006879957,0.000958512],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99812305,0.0002228704,0.00034069334,0.00021433551,0.0003529143,0.0007461258],"domain_scores_gemma":[0.9990425,0.00013143024,0.00011093079,0.00038443934,0.00016782516,0.0001628918],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006648245,0.0002554098,0.00029922527,0.0004668462,0.00019551713,0.00002902113,0.00008684162,0.00015674449,0.00004578471],"category_scores_gemma":[0.0000074057575,0.00027099816,0.00012067907,0.00075515115,0.000025538167,0.00040678345,0.0000014799673,0.00024858236,0.00000418839],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015097785,0.0004331506,0.00024357035,0.00021554843,0.00011302969,0.000010220885,0.00036030842,0.99616504,0.00092140055,0.00052565703,0.00023156706,0.000765416],"study_design_scores_gemma":[0.0011752964,0.00022680503,0.00039621355,0.00005387129,0.00016117335,0.00001029714,0.0011004438,0.7693875,0.22022007,0.000029148974,0.0067905756,0.00044861867],"about_ca_topic_score_codex":0.0004411259,"about_ca_topic_score_gemma":0.00013389149,"teacher_disagreement_score":0.9757942,"about_ca_system_score_codex":0.0006449195,"about_ca_system_score_gemma":0.00017592119,"threshold_uncertainty_score":0.9999742},"labels":[],"label_agreement":null},{"id":"W2023750756","doi":"10.1109/pesgm.2014.6939256","title":"Energy storage in an open electricity market with contribution to transmission congestion relief","year":2014,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Energy storage; Computer science; Integer programming; Electricity; Linear programming; Electricity market; Mathematical optimization; Compressed air energy storage; Transmission (telecommunications); Economic dispatch; Energy (signal processing); Operations research; Electric power system; Power (physics); Engineering; Telecommunications; Electrical engineering","score_opus":0.004180332420500499,"score_gpt":0.20066075413560647,"score_spread":0.19648042171510596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2023750756","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05017673,0.00003841493,0.9374486,0.00008406495,0.000055704906,0.00037352438,0.0000011038968,0.00024541852,0.011576395],"genre_scores_gemma":[0.9962584,0.000019618057,0.0031308986,0.000093022005,0.000023861652,0.000059912007,0.000033609234,0.000029133711,0.00035156388],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902844,0.00014347713,0.0002107163,0.00021989299,0.0001453436,0.00025214325],"domain_scores_gemma":[0.99953413,0.000044194818,0.000025406622,0.00019482306,0.00007662917,0.0001248323],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045228054,0.00013669259,0.00019288858,0.00017849663,0.000036616493,0.00007752179,0.00019753425,0.00009818382,0.00006554961],"category_scores_gemma":[0.000024833274,0.00012086427,0.000009163426,0.0006004024,0.0000041503126,0.00038450854,0.000011815027,0.00008765413,0.0000048284387],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008287648,0.00025654523,0.0025645765,0.00006681665,0.00003781252,0.000012061693,0.00025975847,0.8481954,0.035600044,0.012561877,0.008252397,0.09136397],"study_design_scores_gemma":[0.001069395,0.0006238873,0.005834971,0.00006478461,0.000008174463,0.000007309581,0.000003456613,0.97271496,0.009475486,0.00006895318,0.009859431,0.00026917717],"about_ca_topic_score_codex":0.00021089274,"about_ca_topic_score_gemma":0.00053152523,"teacher_disagreement_score":0.94608164,"about_ca_system_score_codex":0.00022160255,"about_ca_system_score_gemma":0.000021368092,"threshold_uncertainty_score":0.4928702},"labels":[],"label_agreement":null},{"id":"W2024486074","doi":"10.2202/1553-779x.1255","title":"Radial System Reconfiguration to Minimize Operating Costs in Markets","year":2007,"lang":"en","type":"article","venue":"International Journal of Emerging Electric Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"AC power; Clearing; Market clearing; Electric power system; Control reconfiguration; Reliability engineering; Power (physics); Computer science; Business; Voltage; Electrical engineering; Economics; Engineering; Finance; Microeconomics; Embedded system","score_opus":0.005134573617110478,"score_gpt":0.23490431849846954,"score_spread":0.22976974488135907,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2024486074","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28999448,0.0021735283,0.6660019,0.00016313375,0.020421652,0.00062832073,0.00000610724,0.00020094632,0.020409938],"genre_scores_gemma":[0.9981224,0.000042151823,0.0010778452,0.000034849356,0.0005595647,0.000011719226,0.0000043860814,0.000053210664,0.00009385879],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.996699,0.00013290285,0.0016646992,0.00020021896,0.00084458495,0.00045864293],"domain_scores_gemma":[0.99835867,0.00023905205,0.00040477258,0.00015658287,0.00065764494,0.00018329083],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0025289094,0.00024106345,0.00042227286,0.0017775731,0.00004203802,0.00017612918,0.0005365643,0.00013593929,0.000013993362],"category_scores_gemma":[0.00031864902,0.00024862422,0.00010449665,0.0009422391,0.000005473377,0.00044901983,0.00001874762,0.00033792463,0.0000239999],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010340753,0.0002640574,0.011433865,0.00031997767,0.0015116108,0.0022690604,0.005312025,0.7812665,0.14231838,0.0036153677,0.018974165,0.03168088],"study_design_scores_gemma":[0.0073555172,0.0006522492,0.020945849,0.00518951,0.00010149641,0.0076035433,0.0030126336,0.90811354,0.025002195,0.000013026456,0.02000773,0.0020027177],"about_ca_topic_score_codex":0.00006547094,"about_ca_topic_score_gemma":0.000012587983,"teacher_disagreement_score":0.7081279,"about_ca_system_score_codex":0.002306367,"about_ca_system_score_gemma":0.00010598565,"threshold_uncertainty_score":0.9999966},"labels":[],"label_agreement":null},{"id":"W2024489591","doi":"10.1109/5.824000","title":"Competition and system stability-the reward and the penalty","year":2000,"lang":"en","type":"article","venue":"Proceedings of the IEEE","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Sanctions; Competition (biology); Industrial organization; Electric power system; Electricity; Value (mathematics); Market power; Fragmentation (computing); Business; Electricity market; Risk analysis (engineering); Microeconomics; Economics; Computer science; Power (physics); Engineering; Monopoly; Electrical engineering","score_opus":0.003617781442454254,"score_gpt":0.15005665720419967,"score_spread":0.1464388757617454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2024489591","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.985515,0.0006013666,0.00013954376,0.00057865976,0.00014274933,0.00048443602,0.0000026552655,0.00010147145,0.012434124],"genre_scores_gemma":[0.9996199,0.00010389126,0.000072743336,0.000018195386,0.00004516799,0.000021982045,1.55534e-7,0.00001171449,0.0001062485],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99947244,0.000012866864,0.0001749108,0.00009204733,0.00014026866,0.00010748249],"domain_scores_gemma":[0.9997202,0.00006474761,0.000050424842,0.00008606183,0.00005947846,0.000019052099],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005280788,0.000081269696,0.00012719964,0.000015765112,0.00011607712,0.000049260827,0.0001604347,0.000033901837,0.0000067022493],"category_scores_gemma":[0.000025299101,0.000040724688,0.00002615262,0.00015719832,0.00010385809,0.00009991454,0.000015659849,0.0001023257,0.0000019680547],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003610565,0.00041425443,0.09581705,0.049988158,0.0026451093,0.0000037674508,0.13548152,0.0620781,0.16976966,0.3588526,0.065736726,0.055602502],"study_design_scores_gemma":[0.008185748,0.0002667434,0.024502087,0.002724231,0.00075812824,0.00081802363,0.006323086,0.816317,0.12351371,0.0047169635,0.010514354,0.0013598994],"about_ca_topic_score_codex":0.00002013531,"about_ca_topic_score_gemma":0.0000027571127,"teacher_disagreement_score":0.7542389,"about_ca_system_score_codex":0.000038752187,"about_ca_system_score_gemma":0.000004307432,"threshold_uncertainty_score":0.16607045},"labels":[],"label_agreement":null},{"id":"W2024587919","doi":"10.1109/pes.2010.5589559","title":"Unit commitment with wind generation accounting for transmission congestion","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Residual; Power system simulation; Mathematical optimization; Set (abstract data type); Schedule; Transmission (telecommunications); Computer science; Wind power; Upper and lower bounds; Power (physics); Electric power system; Engineering; Mathematics; Algorithm; Telecommunications; Electrical engineering","score_opus":0.01169954836860633,"score_gpt":0.21160370288705233,"score_spread":0.199904154518446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2024587919","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19145286,0.000025133786,0.80475926,0.00007597557,0.0002514541,0.0004145011,0.0000012968246,0.00024623543,0.002773282],"genre_scores_gemma":[0.96771294,0.0000050059116,0.03180988,0.000018396979,0.00011784172,0.000030219326,0.00005527593,0.000025080919,0.00022533801],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995763,0.00000655604,0.00012004755,0.00009133144,0.00008585057,0.00011992818],"domain_scores_gemma":[0.9997598,0.00002424234,0.000019854308,0.00009661731,0.00006667708,0.0000328293],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012555972,0.00008452249,0.00007137519,0.000053409567,0.00006508675,0.000042063253,0.000043557906,0.00006833181,0.000041714873],"category_scores_gemma":[0.000005851027,0.00006950912,0.0000133140775,0.00010507856,0.0000052836754,0.0001614802,0.0000016673546,0.00007990812,0.0000042934143],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027983575,0.00004299623,0.002085323,0.00013851035,0.00006348172,8.9941636e-7,0.00034569233,0.47270024,0.4700898,0.0034352702,0.0029168173,0.048153006],"study_design_scores_gemma":[0.00054243265,0.000057572644,0.000521045,0.000014711856,0.000018752822,0.0000069270836,0.000010868535,0.93569696,0.052866533,0.000013191541,0.010112786,0.0001382438],"about_ca_topic_score_codex":0.000005349721,"about_ca_topic_score_gemma":0.00005075241,"teacher_disagreement_score":0.7762601,"about_ca_system_score_codex":0.000020852636,"about_ca_system_score_gemma":0.000012456098,"threshold_uncertainty_score":0.28344998},"labels":[],"label_agreement":null},{"id":"W2024667849","doi":"10.1109/syscon.2012.6189540","title":"Optimal dynamic economic dispatch including renewable energy source using artificial bee colony algorithm","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Economic dispatch; Renewable energy; Electric power system; Mathematical optimization; Computer science; Electricity; Artificial bee colony algorithm; Electricity generation; Demand response; Population; Power (physics); Engineering; Mathematics; Electrical engineering","score_opus":0.012574548347436534,"score_gpt":0.22879522166351138,"score_spread":0.21622067331607484,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2024667849","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.065444164,0.00033686933,0.9301113,0.000011540312,0.0007948568,0.000092782706,0.0000067962155,0.0004232981,0.0027784258],"genre_scores_gemma":[0.9052744,0.000024359126,0.09353224,0.000018926348,0.00032294248,0.000015849275,0.000020799953,0.000083115,0.000707392],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99873924,0.000033664594,0.00034649868,0.00018265119,0.00010948226,0.000588484],"domain_scores_gemma":[0.99957484,0.000045674646,0.000059023227,0.0001687686,0.000018397499,0.00013332149],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021557555,0.00020390385,0.00023096846,0.0001544904,0.00013098554,0.00006511171,0.00013447653,0.00013706282,0.00012626285],"category_scores_gemma":[0.000007747901,0.00023170043,0.000056145374,0.00018709108,0.000015012546,0.00043386145,0.000060719496,0.00008610206,0.00004591568],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000024338424,0.000015193531,0.00019427149,0.000010426848,0.000037762806,7.4195157e-7,0.00010007402,0.99001575,0.004599128,0.00013357108,0.00060193246,0.0042887246],"study_design_scores_gemma":[0.00011026612,0.000014287353,0.000023473143,0.000012677356,0.000023205774,0.0000246896,0.000050451392,0.98810154,0.008415181,0.000022330583,0.0029264838,0.0002754201],"about_ca_topic_score_codex":0.001242948,"about_ca_topic_score_gemma":0.0004321093,"teacher_disagreement_score":0.8398302,"about_ca_system_score_codex":0.00074951776,"about_ca_system_score_gemma":0.000034060755,"threshold_uncertainty_score":0.9448469},"labels":[],"label_agreement":null},{"id":"W2026353558","doi":"10.1109/sege.2013.6707918","title":"Long-term system operational impacts of wind generation penetration in Ontario power system","year":2013,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Electricity generation; Environmental science; Grid; Monte Carlo method; Electric power system; Wind speed; Distributed generation; Meteorology; Renewable energy; Computer science; Engineering; Power (physics); Electrical engineering","score_opus":0.00783378005044173,"score_gpt":0.18354406521868558,"score_spread":0.17571028516824386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2026353558","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92188984,0.0000959921,0.062186826,0.000008324158,0.0004852795,0.0007219131,0.0000016286348,0.00018041562,0.014429801],"genre_scores_gemma":[0.99872106,0.0000016579367,0.0007920504,0.0000062581403,0.00004941448,0.00004233112,0.00008241115,0.000025564312,0.0002792659],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998769,0.000047350033,0.0005665592,0.00016653644,0.00024908528,0.00020146766],"domain_scores_gemma":[0.99950486,0.000017474515,0.000070108,0.00019666084,0.00014901014,0.00006190339],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018542068,0.00015766144,0.0002155785,0.00021278023,0.000030462363,0.000089471774,0.000092145645,0.00012743252,0.0002272808],"category_scores_gemma":[0.000007138978,0.00015172354,0.000034094144,0.00022166698,0.000006376178,0.0006059392,0.000009247633,0.000100530975,0.000082894105],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009764299,0.00007265408,0.32073072,0.0008256031,0.000113362,0.000010587824,0.0017247554,0.5747766,0.0931389,0.006836929,0.0015078195,0.00025234537],"study_design_scores_gemma":[0.0006369246,0.00007483764,0.3833391,0.0002524589,0.000013343134,0.000042770418,0.00013038602,0.60149217,0.013730502,7.5888266e-7,0.000007249509,0.00027950824],"about_ca_topic_score_codex":0.011737904,"about_ca_topic_score_gemma":0.049257636,"teacher_disagreement_score":0.0794084,"about_ca_system_score_codex":0.001232762,"about_ca_system_score_gemma":0.00011272251,"threshold_uncertainty_score":0.994843},"labels":[],"label_agreement":null},{"id":"W2027079130","doi":"10.2316/journal.203.2006.3.203-3364","title":"A BIBLIOGRAPHICAL SURVEY OF EVOLUTIONARY COMPUTATION APPLICATIONS IN POWER SYSTEMS (1994–2003)","year":2006,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computation; Electric power system; Computer science; Evolutionary computation; Power (physics); Operations research; Engineering; Artificial intelligence; Algorithm; Physics; Thermodynamics","score_opus":0.0054538968401171796,"score_gpt":0.2147619167965792,"score_spread":0.209308019956462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2027079130","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16525954,0.022418346,0.798599,0.000038397146,0.0070428844,0.0002834624,0.00014441856,0.000091980524,0.0061219702],"genre_scores_gemma":[0.99933815,0.00024744403,0.00016310415,0.0000037207155,0.000087802,0.000015252951,0.00006540802,0.000022364447,0.000056738507],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9980211,0.00014112396,0.0010342584,0.00012311133,0.0005287395,0.00015166726],"domain_scores_gemma":[0.998384,0.00013804241,0.00034591465,0.00008866736,0.0009829147,0.000060446462],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047209585,0.00014726116,0.00032458495,0.002097295,0.000021790967,0.000073164854,0.00021492215,0.00011879124,0.000003677847],"category_scores_gemma":[0.000028209417,0.00013935109,0.000056029192,0.001818937,0.00003635093,0.0002668765,0.000017655939,0.00012094858,7.198697e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050142462,0.00016398111,0.10182125,0.00005716842,0.00024855768,0.000022259037,0.00011102207,0.8815702,0.00042156267,0.007935669,0.0074831834,0.00011495411],"study_design_scores_gemma":[0.0019668287,0.00021517812,0.543523,0.00061166333,0.00003863578,0.00082425296,0.00027063861,0.43856892,0.00007673366,0.00021281253,0.013188838,0.00050250656],"about_ca_topic_score_codex":0.0025476986,"about_ca_topic_score_gemma":0.000066725544,"teacher_disagreement_score":0.8340786,"about_ca_system_score_codex":0.00012806832,"about_ca_system_score_gemma":0.000056691817,"threshold_uncertainty_score":0.5682573},"labels":[],"label_agreement":null},{"id":"W2031547297","doi":"10.1111/1540-5982.t01-2-00004","title":"Decentralizing hydro power production","year":2003,"lang":"en","type":"article","venue":"Canadian Journal of Economics/Revue canadienne d économique","topic":"Electric Power System Optimization","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Production (economics); Hydropower; Inefficiency; Constraint (computer-aided design); Hydro power; Electricity; Competition (biology); Microeconomics; Electricity market; Power (physics); Hydroelectricity; Environmental economics; Economics; Natural resource economics; Environmental science; Water resource management; Engineering","score_opus":0.051645240989833266,"score_gpt":0.15410119363643374,"score_spread":0.10245595264660047,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2031547297","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9880696,0.0006532896,0.00096429524,0.00021896824,0.0045024576,0.00018863339,0.000013445185,0.000022315056,0.0053669917],"genre_scores_gemma":[0.9983939,0.00013316712,0.0008790915,0.0000795552,0.00022036635,0.000006528015,0.0000040346495,0.0000711903,0.00021215125],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99838185,0.000049742626,0.0006890051,0.00020009113,0.0000023574107,0.0006769477],"domain_scores_gemma":[0.9981747,0.00003568082,0.00023065376,0.00027713805,0.00012669494,0.0011551195],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005259698,0.00022297971,0.0003735039,0.0006260275,0.00009699702,0.000092093076,0.00024410109,0.00014657507,0.0002334067],"category_scores_gemma":[0.00023483128,0.00029093944,0.00012057027,0.00018794788,0.00003968283,0.000495066,0.000002500649,0.00026497644,0.0000221614],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000139724425,0.000009755648,0.0057395436,0.00007502978,0.00030211324,0.00013801586,0.0018047389,0.7902436,0.00023482575,0.19471417,0.0052795825,0.0014446237],"study_design_scores_gemma":[0.004337444,0.0012954385,0.0023386409,0.0010423715,0.00039280034,0.01770691,0.0023896096,0.058927704,0.032622,0.17181386,0.70174557,0.005387654],"about_ca_topic_score_codex":0.005301256,"about_ca_topic_score_gemma":0.7088724,"teacher_disagreement_score":0.7313159,"about_ca_system_score_codex":0.0027013903,"about_ca_system_score_gemma":0.000983665,"threshold_uncertainty_score":0.9999543},"labels":[],"label_agreement":null},{"id":"W2031999112","doi":"10.1111/j.1467-8292.2007.00346.x","title":"AGENCY COSTS OF THIRD‐PARTY FINANCING AND THE EFFECTS OF REGULATORY CHANGE ON UTILITY COSTS AND FACTOR CHOICES","year":2007,"lang":"en","type":"article","venue":"Annals of Public and Cooperative Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Restructuring; Agency cost; Agency (philosophy); Finance; Productivity; Business; Capital (architecture); Economics; Regulatory agency; Distribution (mathematics); Public economics; Industrial organization; Corporate governance; Shareholder; Macroeconomics","score_opus":0.03247087810434078,"score_gpt":0.2495447605205868,"score_spread":0.21707388241624603,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2031999112","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99190223,0.005295567,0.0010358243,0.00006879148,0.00009093804,0.00035529674,0.000020238518,0.00001138658,0.0012197383],"genre_scores_gemma":[0.9969105,0.0029338684,0.000029746177,0.000063245054,0.000019486599,0.000009224069,0.0000029141358,0.00000884272,0.000022145647],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9993332,0.00005999888,0.00029425675,0.0001300616,0.000041980165,0.00014048784],"domain_scores_gemma":[0.99918944,0.00038654724,0.00013439167,0.00013186147,0.00010575975,0.000052010208],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00062078575,0.00011383068,0.00029886718,0.00007864182,0.000041846895,0.000017962251,0.00005989276,0.000068212175,0.000002573568],"category_scores_gemma":[0.00015959314,0.00008921776,0.00002362503,0.000086365915,0.00014615,0.00025370563,0.000026158837,0.000057104513,1.8361396e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005897819,0.00032205664,0.073739566,0.0030083554,0.0011736258,0.0000031857608,0.025347805,0.0012834324,0.003579268,0.14422072,0.000983048,0.7457491],"study_design_scores_gemma":[0.003674377,0.0009273729,0.7725976,0.00048770045,0.000048274498,0.000006894184,0.00039505077,0.1000907,0.11970593,0.00031033327,0.0011880678,0.0005676844],"about_ca_topic_score_codex":0.000039888695,"about_ca_topic_score_gemma":0.00006354075,"teacher_disagreement_score":0.74518144,"about_ca_system_score_codex":0.0000213562,"about_ca_system_score_gemma":0.00002519853,"threshold_uncertainty_score":0.36381948},"labels":[],"label_agreement":null},{"id":"W2032214672","doi":"10.1109/mper.2001.4311234","title":"Combined Pool/Bilateral Dispatch-Part 1: Performance of Mixed Trading Strategies","year":2001,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Profitability index; Revenue; Microeconomics; Economic dispatch; Business; Economics; Industrial organization; Power (physics); Electric power system; Finance","score_opus":0.007873853520635382,"score_gpt":0.19969068446738905,"score_spread":0.19181683094675367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2032214672","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8492139,0.05868955,0.08244184,0.00007175589,0.004057031,0.0010222464,0.00001092006,0.0013622228,0.0031305486],"genre_scores_gemma":[0.97547215,0.023656283,0.00059319334,0.000016745415,0.00005682707,0.000048396872,0.00001175534,0.00007565811,0.00006899862],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985205,0.000021250817,0.00063852523,0.00019527243,0.00022548673,0.00039894326],"domain_scores_gemma":[0.9993594,0.000044232842,0.00008086019,0.00036373647,0.000057547153,0.00009421703],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00026844983,0.00030324678,0.0005644089,0.00013221061,0.000024951625,0.000032041222,0.0002368163,0.00008113891,0.00009288666],"category_scores_gemma":[0.000022832315,0.00030345988,0.000118668526,0.0006141735,0.000013113211,0.00039126637,0.000010979635,0.00018971982,0.00002325692],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021537538,0.00008390314,0.0021531906,0.020110289,0.00030802717,0.000037307655,0.00025387123,0.95191264,0.01194434,0.00040059732,0.00836651,0.004407788],"study_design_scores_gemma":[0.0010120808,0.0003553767,0.0042486927,0.018771272,0.00021610383,0.00017545573,0.000013695373,0.9364664,0.011064948,0.00001034496,0.026182685,0.0014829647],"about_ca_topic_score_codex":0.0000029399346,"about_ca_topic_score_gemma":6.7652405e-7,"teacher_disagreement_score":0.12625825,"about_ca_system_score_codex":0.00008868027,"about_ca_system_score_gemma":0.0000221464,"threshold_uncertainty_score":0.99994177},"labels":[],"label_agreement":null},{"id":"W2035748496","doi":"10.5539/mas.v3n6p38","title":"Study on Economic, Rapid and Environmental Power Dispatch Based on Fuzzy Multi-objective Optimization","year":2009,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Economic dispatch; Computer science; Mathematical optimization; Fuzzy logic; MATLAB; Process (computing); Power system simulation; Dynamic programming; Linear programming; Unit (ring theory); Electric power system; Operations research; Power (physics); Engineering; Mathematics; Artificial intelligence; Algorithm","score_opus":0.006996673967471825,"score_gpt":0.20249065856349543,"score_spread":0.1954939845960236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2035748496","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18921576,0.000022263488,0.797708,0.0000245614,0.0001519724,0.0009697131,0.000009253139,0.00020865869,0.011689806],"genre_scores_gemma":[0.9967683,0.000004727614,0.0030565069,0.00008561256,0.0000124090575,0.000034301327,0.0000056180857,0.000019608307,0.000012894215],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988335,0.000016124339,0.00016869832,0.00045352438,0.0002591617,0.0002690052],"domain_scores_gemma":[0.999547,0.0000281525,0.000040472452,0.0002881171,0.0000055425608,0.0000907384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026550016,0.00018311533,0.00014478958,0.00019981648,0.00016455028,0.0000848235,0.00018202858,0.000044538232,0.000011568428],"category_scores_gemma":[0.0000057708935,0.00018474451,0.000015861177,0.00016786977,0.000061763836,0.00015820785,0.00001698627,0.00010644056,0.00002284286],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000190936,0.00014442578,0.0002014202,0.0000010902454,0.000003232211,0.0000010675301,0.000792121,0.9882264,0.0083854515,0.00003883241,0.000008871198,0.0021779928],"study_design_scores_gemma":[0.000716561,0.0002507192,0.0074940473,0.000005017072,0.0000048292045,8.3503124e-7,0.00014478483,0.9882267,0.002939585,0.000019902573,0.0000023347598,0.00019464343],"about_ca_topic_score_codex":0.0000015949913,"about_ca_topic_score_gemma":0.0000013242519,"teacher_disagreement_score":0.8075526,"about_ca_system_score_codex":0.00039826048,"about_ca_system_score_gemma":0.000023070317,"threshold_uncertainty_score":0.75336623},"labels":[],"label_agreement":null},{"id":"W2036213815","doi":"10.1109/irep.2013.6629402","title":"Chance-constrained generation expansion planning based on iterative risk allocation","year":2013,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis; University of Calgary","funders":"","keywords":"Reliability (semiconductor); Mathematical optimization; Iterative method; Computer science; Reliability engineering; Mathematics; Engineering","score_opus":0.010367084757955707,"score_gpt":0.20453421009788372,"score_spread":0.19416712533992803,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2036213815","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.119631805,0.00004666438,0.86867774,0.000065378255,0.00029740378,0.00044199097,0.0000021040962,0.0004379055,0.010399026],"genre_scores_gemma":[0.9909603,0.000007890033,0.008385279,0.000103770166,0.00012483654,0.00013754814,0.00008900255,0.00002533163,0.00016603571],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992543,0.000053196458,0.00020673945,0.00016745596,0.00015050432,0.00016781225],"domain_scores_gemma":[0.9996087,0.000049749277,0.000046965117,0.00016560007,0.000081524406,0.000047479327],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000111326364,0.00013957078,0.000105636434,0.00014677363,0.00007639747,0.00007360154,0.00005391967,0.000078904166,0.00019293357],"category_scores_gemma":[0.00003565845,0.00012941373,0.000024273517,0.0002098457,0.0000072894995,0.00029065748,0.0000032312869,0.00009813007,0.00013607027],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002229034,0.000012745656,0.00021684714,0.0000096968315,0.000009849549,4.469628e-7,0.00029958945,0.9629719,0.027227592,0.000117579075,0.002542362,0.0065891347],"study_design_scores_gemma":[0.00026469343,0.00006282843,0.0006759014,0.000032463988,0.0000051029983,8.3120057e-7,0.000027969321,0.96154076,0.03716932,0.000014991714,0.0000622367,0.00014291538],"about_ca_topic_score_codex":0.000030949257,"about_ca_topic_score_gemma":0.0000054174147,"teacher_disagreement_score":0.8713285,"about_ca_system_score_codex":0.00009982199,"about_ca_system_score_gemma":0.000015964255,"threshold_uncertainty_score":0.52773386},"labels":[],"label_agreement":null},{"id":"W2036531676","doi":"10.1007/s10614-010-9200-8","title":"A Benders Decomposition Method for Solving Stochastic Complementarity Problems with an Application in Energy","year":2010,"lang":"en","type":"article","venue":"Computational Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Complementarity (molecular biology); Variational inequality; Mixed complementarity problem; Mathematical optimization; Mathematics; Benders' decomposition; Linear complementarity problem; Convergence (economics); Applied mathematics; Complementarity theory; Mathematical economics; Economics","score_opus":0.00907199003721107,"score_gpt":0.24683673896268393,"score_spread":0.23776474892547286,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2036531676","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.062431656,0.000008568718,0.93688345,0.000040017643,0.00010191638,0.00035652917,0.000018348133,0.000083582665,0.00007595068],"genre_scores_gemma":[0.7168446,8.021674e-7,0.28238797,0.000033932105,0.000037360885,0.000162313,0.0005104725,0.000021706175,8.3275984e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993668,0.000010270343,0.00024774225,0.00019020053,0.000039230497,0.0001457156],"domain_scores_gemma":[0.9996167,0.00012332886,0.00006592373,0.00009560869,0.000052557465,0.000045921304],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017638433,0.000104521685,0.00012496996,0.0001304157,0.00005602786,0.00004259011,0.00008849217,0.000049083024,0.0000039998195],"category_scores_gemma":[0.0000034617851,0.00012681105,0.000018081973,0.00008664269,0.000010507712,0.00022753308,0.0000074418354,0.000080071666,0.0000010550036],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010227268,0.000024267749,0.00015493973,0.000018469047,0.000016008496,4.4634053e-8,0.000096699245,0.9744829,0.00021509772,0.020340582,0.00001050766,0.0046302406],"study_design_scores_gemma":[0.00056248915,0.00004985021,0.0007025947,0.000006068302,0.0000073721885,0.000009414286,0.000016733758,0.9848513,0.000075615215,0.013477309,0.0000977139,0.00014355985],"about_ca_topic_score_codex":0.00007629276,"about_ca_topic_score_gemma":0.002572441,"teacher_disagreement_score":0.6544955,"about_ca_system_score_codex":0.00015975854,"about_ca_system_score_gemma":0.000043480944,"threshold_uncertainty_score":0.5171204},"labels":[],"label_agreement":null},{"id":"W203682728","doi":"10.1007/978-1-4614-8987-0_1","title":"Recent Progress in Modeling Unit Commitment Problems","year":2013,"lang":"en","type":"book-chapter","venue":"Springer proceedings in mathematics & statistics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Power system simulation; Computer science; Mathematical optimization; Schedule; Optimization problem; Electric power system; Operations research; Unit (ring theory); Point (geometry); Power (physics); Engineering; Mathematics","score_opus":0.025238016162458153,"score_gpt":0.23243803322077308,"score_spread":0.20720001705831492,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W203682728","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008676,0.011227832,0.2818071,0.00007954342,0.0010570893,0.007646892,0.00016122144,0.0011524342,0.6960003],"genre_scores_gemma":[0.014552307,0.021955902,0.89872384,0.00003726792,0.00030719678,0.0015015673,0.00023845221,0.0015056792,0.06117781],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969401,0.0000050772046,0.0014195828,0.00043063873,0.000592156,0.00061244535],"domain_scores_gemma":[0.9988475,0.000070936156,0.00032272018,0.0002769603,0.00036655844,0.00011536888],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00050818705,0.0006666766,0.00082090014,0.00065058406,0.000039837378,0.00017747581,0.00041105316,0.0004456958,0.00013003538],"category_scores_gemma":[0.00006370246,0.000734997,0.000044743974,0.00017338818,0.000049265207,0.00016680537,0.00011729834,0.0009023488,0.0001647075],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011979018,0.00037128627,0.0005619407,0.02080908,0.00035323738,0.00008612989,0.009648061,0.12871711,0.0000259091,0.78218514,0.004470559,0.052759595],"study_design_scores_gemma":[0.00038462423,0.000044316253,0.0000074114364,0.0028539326,0.000053198066,0.000010866246,0.00005718347,0.90593827,0.000014063279,0.07987616,0.009988038,0.0007719213],"about_ca_topic_score_codex":0.000004549533,"about_ca_topic_score_gemma":0.00003315693,"teacher_disagreement_score":0.77722114,"about_ca_system_score_codex":0.0007243789,"about_ca_system_score_gemma":0.000059968974,"threshold_uncertainty_score":0.9995101},"labels":[],"label_agreement":null},{"id":"W2037962945","doi":"10.1109/pesgm.2012.6345612","title":"Optimal incentive design to facilitate solar PV investments in Ontario","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Photovoltaic system; Tariff; Internal rate of return; Incentive; Grid; Environmental economics; Context (archaeology); Investment (military); Return on investment; Business; Feed-in tariff; Solar energy; Solar power; Rate of return; Renewable energy; Computer science; Finance; Economics; Engineering; Power (physics); Electrical engineering; Microeconomics; Energy policy; Production (economics); Geography","score_opus":0.04282282999054314,"score_gpt":0.2056936412309724,"score_spread":0.16287081124042924,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2037962945","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14677317,0.00008953989,0.840413,0.000010513099,0.00029177495,0.00044732454,0.0000010446572,0.00015653264,0.011817106],"genre_scores_gemma":[0.9326864,0.0000027610627,0.06520104,0.000063938845,0.000012281253,0.00005086659,0.000005139929,0.000018414174,0.001959172],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999175,0.000040785755,0.0001873501,0.00010697348,0.00011455215,0.0003753508],"domain_scores_gemma":[0.9996953,0.000025136856,0.00001128119,0.00012281409,0.000018160894,0.0001273102],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022736964,0.000119955956,0.00012370746,0.00013856914,0.00001676155,0.000017530965,0.00008570291,0.00005355574,0.00012174063],"category_scores_gemma":[0.000017123513,0.00012248203,0.000017174953,0.00022968688,0.0000044712638,0.00033836535,0.000022432878,0.00010770798,0.00033345076],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018303237,0.00006293262,0.036885798,0.000013470964,0.000047885762,0.000003545892,0.011621462,0.9449953,0.0011200976,0.00016213587,0.0042648,0.00080428424],"study_design_scores_gemma":[0.0039931587,0.0004907261,0.2845869,0.0002147423,0.00006309266,0.000023235114,0.00079594646,0.576987,0.100367315,0.00013646677,0.029778628,0.0025627413],"about_ca_topic_score_codex":0.0041478835,"about_ca_topic_score_gemma":0.00443398,"teacher_disagreement_score":0.7859132,"about_ca_system_score_codex":0.0007122527,"about_ca_system_score_gemma":0.000030432479,"threshold_uncertainty_score":0.62703866},"labels":[],"label_agreement":null},{"id":"W2041190124","doi":"10.1016/j.enconman.2009.12.001","title":"Strategic simulation of the energy management in a Kraft mill","year":2010,"lang":"en","type":"article","venue":"Energy Conversion and Management","topic":"Electric Power System Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Polytechnique Montréal","keywords":"Cogeneration; Steam turbine; Mill; Engineering; Payback period; Steam-electric power station; Process engineering; Waste management; Turbine; Electricity generation; Environmental science; Power (physics); Production (economics); Mechanical engineering; Combined cycle; Economics","score_opus":0.00486151011384164,"score_gpt":0.18031202018336237,"score_spread":0.17545051006952073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2041190124","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42682743,0.0011239887,0.21042414,0.0004077222,0.0054039746,0.0011445984,0.0000052859864,0.0005285868,0.35413426],"genre_scores_gemma":[0.99787325,0.0004924728,0.00027198,0.00006393136,0.0000107453225,0.000013883658,0.0000042161255,0.000010836387,0.001258707],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99944407,0.00002124488,0.00016267157,0.00012228839,0.00013173006,0.00011801976],"domain_scores_gemma":[0.9997255,0.000012981368,0.000034226938,0.00018978218,0.000012017406,0.000025461259],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008223358,0.000090805646,0.00008416911,0.00014905636,0.000026400076,0.000011909328,0.00010843463,0.000043939515,0.000031772197],"category_scores_gemma":[7.610031e-7,0.00007659666,0.000024824645,0.00025102927,0.000014954225,0.000053759344,0.00006469957,0.00004568646,0.0000012135957],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011099237,0.000041304138,0.00016892358,0.00022048685,0.00009598719,0.000010418908,0.00008810315,0.8384011,0.0010510148,0.14812027,0.00077780226,0.01101348],"study_design_scores_gemma":[0.0007568377,0.000013819314,0.001028905,0.00003934188,0.00002784225,8.394644e-7,0.000094230265,0.9521866,0.0022056757,0.00042924506,0.043077063,0.00013962117],"about_ca_topic_score_codex":0.000053497708,"about_ca_topic_score_gemma":0.0000958857,"teacher_disagreement_score":0.57104576,"about_ca_system_score_codex":0.000027407008,"about_ca_system_score_gemma":0.0000022536065,"threshold_uncertainty_score":0.31235212},"labels":[],"label_agreement":null},{"id":"W2041771057","doi":"10.1109/pesgm.2014.6939525","title":"Operational experience with Static var Compensators in Ontario, Canada","year":2014,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University; Hydro One (Canada)","funders":"","keywords":"Plan (archaeology); Renewable energy; Development plan; Computer science; Engineering; Environmental economics; Civil engineering; Economics; Electrical engineering; Geography","score_opus":0.00341986999060798,"score_gpt":0.15404291090203223,"score_spread":0.15062304091142426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2041771057","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8257767,0.0000056808176,0.15331976,0.000027578411,0.00013490077,0.00011686172,4.4768203e-7,0.00006105878,0.020557031],"genre_scores_gemma":[0.99601704,2.4204965e-7,0.0034800728,0.000091645896,0.0000050442313,0.000016467422,0.000006648283,0.000008923622,0.00037392759],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995451,0.000011953912,0.000115160256,0.00007667145,0.00013263195,0.00011846102],"domain_scores_gemma":[0.99983096,0.000026094876,0.000007928993,0.000081852675,0.000018243785,0.000034905792],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000040617673,0.00006433884,0.00007588422,0.000030857762,0.000016413964,0.000015495612,0.000054622098,0.00001366321,0.00024359622],"category_scores_gemma":[0.000005645649,0.00005557727,0.0000030629171,0.000108424014,0.000004762179,0.00008404695,0.00000335647,0.00005500299,0.0000032416979],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002370676,0.0000056839017,0.064092435,0.000009205711,0.000007022978,0.0000040286404,0.00093836687,0.9313735,0.0000787539,0.0018117838,0.0015955541,0.00008130686],"study_design_scores_gemma":[0.00043355912,0.000036313922,0.064952195,0.00002531935,0.0000022180761,0.000009260163,0.00013241048,0.92853564,0.0010136331,0.000009707023,0.004607435,0.00024229282],"about_ca_topic_score_codex":0.920628,"about_ca_topic_score_gemma":0.9982146,"teacher_disagreement_score":0.17024034,"about_ca_system_score_codex":0.0004206443,"about_ca_system_score_gemma":0.00020975921,"threshold_uncertainty_score":0.26672077},"labels":[],"label_agreement":null},{"id":"W2042743259","doi":"10.1109/pes.2010.5589322","title":"Oligopolistic competition of gencos in reactive power ancillary service provisions","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"AC power; Oligopoly; Procurement; Market power; Electric power system; Operator (biology); Competition (biology); Electricity market; Incentive; Business; Industrial organization; Computer science; Power (physics); Risk analysis (engineering); Microeconomics; Economics; Cournot competition; Engineering; Electricity; Electrical engineering; Monopoly; Voltage; Marketing","score_opus":0.003489291715305957,"score_gpt":0.19221003147504487,"score_spread":0.1887207397597389,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2042743259","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84719545,0.00004472728,0.033796612,0.00007557528,0.0004699836,0.00041350053,0.000013116708,0.00024920487,0.11774181],"genre_scores_gemma":[0.9967711,0.0000057299803,0.0030971558,0.00002978776,0.000019494531,0.000012364928,0.000012517308,0.000016512624,0.00003531132],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994569,0.00001341824,0.00020169096,0.000090962974,0.00010433979,0.00013267974],"domain_scores_gemma":[0.9996238,0.00004543342,0.000028827712,0.00017560307,0.00009090222,0.000035482044],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000092985814,0.000078667006,0.00012455342,0.00013358296,0.000011684731,0.0000065401528,0.00008237233,0.00007930845,0.00011999505],"category_scores_gemma":[0.000029900737,0.00007856114,0.000015692369,0.00040279914,0.000008077125,0.00012224611,0.000011806375,0.00014794807,0.00002793269],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039016264,0.00034698006,0.009180316,0.00064721605,0.00007450047,0.000021452774,0.0034963577,0.09961661,0.8262975,0.056571763,0.0023297532,0.0013785023],"study_design_scores_gemma":[0.0016057311,0.00015354426,0.06899365,0.00024099866,0.000035721303,0.00007575616,0.0005373954,0.8250995,0.09724829,0.0012197987,0.003933223,0.0008563454],"about_ca_topic_score_codex":0.00016387198,"about_ca_topic_score_gemma":0.0008535036,"teacher_disagreement_score":0.72904927,"about_ca_system_score_codex":0.00004791763,"about_ca_system_score_gemma":0.000027780126,"threshold_uncertainty_score":0.32036301},"labels":[],"label_agreement":null},{"id":"W2042804291","doi":"10.1109/eem.2012.6254727","title":"On the significance of hydro storage in leveraging wind integration in thermal systems","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Renewable energy; Environmental science; Diversification (marketing strategy); Hydroelectricity; Electric power system; Pumped-storage hydroelectricity; Environmental economics; Wind speed; Energy storage; Computer science; Reliability engineering; Marine engineering; Distributed generation; Engineering; Meteorology; Business; Electrical engineering; Power (physics); Economics","score_opus":0.012005068557882763,"score_gpt":0.19776253499842242,"score_spread":0.18575746644053964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2042804291","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9512127,0.00023410893,0.03200834,0.000018874445,0.00030632116,0.00042374927,5.633504e-7,0.000048333422,0.01574701],"genre_scores_gemma":[0.99978936,0.00000280023,0.00003682802,0.000008913388,0.000027375216,0.00003478114,0.000001283836,0.000013301136,0.00008538671],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993634,0.00007859906,0.00021612486,0.000060666905,0.000107327156,0.00017383981],"domain_scores_gemma":[0.99968755,0.00012560633,0.00003203872,0.00012863221,0.00001004737,0.000016116659],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049956434,0.0000757377,0.00010605889,0.00011883102,0.000008633588,0.000010721401,0.00007743814,0.000041363746,0.000014137681],"category_scores_gemma":[0.000030357316,0.0000541763,0.000012332684,0.0003027183,0.000005778251,0.00015679095,0.0000045974502,0.00011531613,0.0000068549048],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000039176193,0.00002088988,0.003944839,0.000028780043,0.0000044829085,4.9732677e-7,0.0014375754,0.98242486,0.008647481,0.0029186201,0.00008963466,0.0004784454],"study_design_scores_gemma":[0.00022051725,0.000016052987,0.01806748,0.00015218939,0.0000024869323,0.000001428397,0.00040897727,0.9654479,0.015504919,0.000014142772,0.000029955343,0.00013394775],"about_ca_topic_score_codex":0.00014100193,"about_ca_topic_score_gemma":0.000017870472,"teacher_disagreement_score":0.04857663,"about_ca_system_score_codex":0.00015721312,"about_ca_system_score_gemma":0.000006247385,"threshold_uncertainty_score":0.22092454},"labels":[],"label_agreement":null},{"id":"W2043006350","doi":"10.1109/tpwrs.2004.826706","title":"Discussion of “New Models for Integrated Short-Term Forward Electricity Markets”","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Term (time); Electricity; Electricity market; Electric power system; Computer science; Mathematical economics; Electricity system; Economics; Electricity generation; Operations research; Engineering; Electrical engineering; Power (physics); Physics","score_opus":0.01252078679795736,"score_gpt":0.2236188163585204,"score_spread":0.21109802956056303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2043006350","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0045819064,0.00021245505,0.9902999,0.00003108085,0.002130168,0.0012241199,0.00009148938,0.00045490495,0.0009739807],"genre_scores_gemma":[0.9974507,0.000054145952,0.0012708352,0.00000592558,0.000018166731,0.00018271348,0.000014389484,0.00009121604,0.0009118745],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99828285,0.000044135257,0.0006645751,0.00030185343,0.00031076217,0.00039579955],"domain_scores_gemma":[0.99917674,0.000058780115,0.00007744318,0.00039523863,0.00013790738,0.0001538918],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023181789,0.00031000157,0.00045187224,0.00038884734,0.000087439315,0.000045744644,0.00021732916,0.00023164057,0.000013218025],"category_scores_gemma":[0.0000050914837,0.00024192635,0.00021239411,0.0006656497,0.000016876988,0.00032928577,6.301597e-7,0.00022097831,0.000008794512],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010064817,0.00010031873,0.0000037601005,0.00018971255,0.00015264432,0.0000014010227,0.0004636631,0.9914718,0.005538823,0.00017524074,0.00064665615,0.0011553079],"study_design_scores_gemma":[0.0022095426,0.00059276057,0.000024637346,0.00079064805,0.00017198568,0.000055436274,0.0001858991,0.8809827,0.11296616,0.00027248016,0.0009880589,0.00075969455],"about_ca_topic_score_codex":0.000078819096,"about_ca_topic_score_gemma":0.000026311123,"teacher_disagreement_score":0.99286884,"about_ca_system_score_codex":0.0004546349,"about_ca_system_score_gemma":0.00011524001,"threshold_uncertainty_score":0.986547},"labels":[],"label_agreement":null},{"id":"W2044586014","doi":"10.1109/pes.2008.4596106","title":"Pricing energy and reserves using stochastic optimization in an alternative electricity market","year":2008,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Activity-based costing; Electricity market; Computer science; Energy market; Linear programming; Electricity; Electric power system; Mathematical optimization; Stochastic programming; Profit (economics); Generator (circuit theory); Contingency; Operations research; Economics; Microeconomics; Electrical engineering; Engineering; Mathematics; Power (physics)","score_opus":0.01570539802198557,"score_gpt":0.21969067733932018,"score_spread":0.20398527931733462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2044586014","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25742128,0.00017089957,0.74040973,0.000002296952,0.00006323357,0.000078652076,4.1810407e-7,0.0001199938,0.001733484],"genre_scores_gemma":[0.9835544,0.0001614544,0.016134264,0.000007952858,0.000035680667,0.000007568307,0.0000051755214,0.000029492834,0.000064005624],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999189,0.00006922897,0.00021781687,0.0001770645,0.0001279448,0.00021894454],"domain_scores_gemma":[0.99966705,0.000093832845,0.000034562887,0.00011297353,0.00003696203,0.000054605294],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013086744,0.00012421946,0.00014695578,0.0002999966,0.00005854934,0.000024214198,0.000072384195,0.0000613964,0.000020536243],"category_scores_gemma":[0.000066243905,0.00013226234,0.000010962651,0.00054419274,0.000013710277,0.00044515778,0.000014733183,0.00006617735,1.8429598e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007914245,0.000011855892,0.0008689819,0.0000090559015,0.000007700124,0.000005787136,0.0002344458,0.9980835,0.00040641986,0.00008044409,0.000025409006,0.00025854039],"study_design_scores_gemma":[0.000241189,0.000034418823,0.00062920904,0.00001986773,0.0000039780625,0.00003692419,0.000017807619,0.9978785,0.0009684924,0.000019979238,0.0000034671323,0.0001462039],"about_ca_topic_score_codex":0.00030341555,"about_ca_topic_score_gemma":0.00013729122,"teacher_disagreement_score":0.7261331,"about_ca_system_score_codex":0.00016628674,"about_ca_system_score_gemma":0.000019684994,"threshold_uncertainty_score":0.5393502},"labels":[],"label_agreement":null},{"id":"W2044702745","doi":"10.1109/tpwrs.2012.2193490","title":"Long-Term Market Equilibrium Model With Strategic, Competitive, and Inflexible Generation","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Term (time); Generator (circuit theory); Electricity; Electricity market; Reliability (semiconductor); Economics; Electricity generation; Computer science; Microeconomics; Industrial organization; Mathematical optimization; Engineering; Mathematics; Power (physics); Thermodynamics; Physics","score_opus":0.02015164106900449,"score_gpt":0.21786168911202652,"score_spread":0.19771004804302203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2044702745","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.066060625,0.00073892594,0.91564614,0.000009848643,0.001259073,0.0004918363,0.00003260616,0.00038373773,0.015377231],"genre_scores_gemma":[0.9978663,0.000055445165,0.00042405867,0.000010803734,0.000041450778,0.00011548207,0.000009387417,0.00007224569,0.0014048332],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987672,0.0000679236,0.00030780895,0.00021462832,0.00025221013,0.0003902053],"domain_scores_gemma":[0.9993973,0.000033750464,0.000054655506,0.00027627972,0.000070151844,0.00016790262],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019102065,0.00026378426,0.00024768428,0.00020187885,0.00008940487,0.00012226097,0.00008298668,0.00013662362,0.00005720313],"category_scores_gemma":[5.673048e-7,0.00024658316,0.000037099733,0.0002565901,0.000029524037,0.00061169366,7.3405937e-7,0.00018650509,0.000025392728],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034853005,0.000077960685,0.0002782594,0.00016983986,0.00012625306,0.000002788183,0.00032596578,0.99184567,0.0060894545,0.00063517946,0.000365143,0.000048663172],"study_design_scores_gemma":[0.00062767835,0.00014370316,0.00020509149,0.0001377106,0.00006135827,0.00013012,0.00007849599,0.99227536,0.0058270316,0.0000018278005,0.00009067928,0.00042096304],"about_ca_topic_score_codex":0.000011627391,"about_ca_topic_score_gemma":0.000017461423,"teacher_disagreement_score":0.9318057,"about_ca_system_score_codex":0.00014155649,"about_ca_system_score_gemma":0.000030770094,"threshold_uncertainty_score":0.9999986},"labels":[],"label_agreement":null},{"id":"W2045533333","doi":"10.1061/(asce)ey.1943-7897.0000177","title":"Optimal Management of Wind Energy with Storage: Structural Implications for Policy and Market Design","year":2014,"lang":"en","type":"article","venue":"Journal of Energy Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Energy storage; Computer science; Electricity market; Wind power; Heuristics; Revenue; Electricity; Environmental economics; Operations research; Risk analysis (engineering); Economics; Business; Engineering; Finance","score_opus":0.004505203431815673,"score_gpt":0.1912719324296611,"score_spread":0.1867667289978454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045533333","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00913708,0.00040288529,0.9898702,0.00003593544,0.000101652244,0.00004678751,0.000002272644,0.000030596726,0.00037257385],"genre_scores_gemma":[0.8822341,0.000112385926,0.11741938,0.0000049414393,0.00011496049,0.0000062966874,0.0000015262412,0.00003709476,0.00006929663],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932677,0.000014126152,0.00030681086,0.00007596005,0.00010082261,0.00017553201],"domain_scores_gemma":[0.9994986,0.00009368341,0.00011941827,0.00011754112,0.00009339265,0.000077363075],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016298791,0.00013354457,0.00021468496,0.00027003078,0.000022980708,0.00002052422,0.0001146716,0.000045241213,0.0000017389082],"category_scores_gemma":[0.000017506003,0.000119372504,0.000039306105,0.00022718495,0.000009437778,0.00014582137,0.000011853425,0.000052174717,1.6398474e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020367554,0.000003443323,0.000022995917,0.00008740057,0.00016100005,0.0000011238669,0.000015595626,0.982342,0.00142288,0.013194131,0.00015263162,0.0025764476],"study_design_scores_gemma":[0.00075081066,0.0002184295,0.0019620503,0.00013850657,0.000073380084,0.00015881022,0.0000070559117,0.99067926,0.0029970817,0.00011024346,0.0027165536,0.00018778803],"about_ca_topic_score_codex":0.000005446326,"about_ca_topic_score_gemma":7.886225e-7,"teacher_disagreement_score":0.87309706,"about_ca_system_score_codex":0.00010156531,"about_ca_system_score_gemma":0.000019248318,"threshold_uncertainty_score":0.48678693},"labels":[],"label_agreement":null},{"id":"W2045605828","doi":"10.1145/2591971.2591999","title":"Randomized auction design for electricity markets between grids and microgrids","year":2014,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Microgrid; Computer science; Double auction; Common value auction; Grid; Mathematical optimization; Electricity; Auction theory; Combinatorial auction; Reverse auction; Auction algorithm; Distributed computing; Microeconomics; Revenue equivalence; Economics; Electrical engineering; Engineering; Mathematics","score_opus":0.009333468830472879,"score_gpt":0.20352096680392912,"score_spread":0.19418749797345625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045605828","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011147099,0.00023272862,0.9855471,0.00004137669,0.0001778243,0.0009081858,0.0000013105047,0.00039087108,0.0015534707],"genre_scores_gemma":[0.9615573,0.000091733345,0.03759916,0.000022563214,0.0001930834,0.00013867945,0.000013765417,0.000036894216,0.00034678314],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991412,0.00015436855,0.00025550448,0.0001514701,0.00007618593,0.0002212647],"domain_scores_gemma":[0.9990074,0.00074926537,0.00003465632,0.00010672096,0.000047141802,0.000054824275],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012990551,0.00013229426,0.00034130408,0.00011825151,0.000053149884,0.00004125294,0.00005834636,0.00009721478,0.000008636321],"category_scores_gemma":[0.00018277705,0.00011860198,0.00005457977,0.00017545359,0.000015932634,0.00010302461,0.000006185136,0.00006129003,0.000004202511],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.054030295,0.00021048375,0.004851095,0.0026220407,0.0034988218,0.0000022278032,0.0012273442,0.22707984,0.035708167,0.010445723,0.18644893,0.47387505],"study_design_scores_gemma":[0.047422763,0.000060773367,0.00023887359,0.0000124429935,0.000097977136,0.000004283128,0.0000019944614,0.92902684,0.020671368,0.00097214925,0.001252231,0.00023830593],"about_ca_topic_score_codex":0.000006180968,"about_ca_topic_score_gemma":7.4390175e-7,"teacher_disagreement_score":0.95041025,"about_ca_system_score_codex":0.00004944823,"about_ca_system_score_gemma":0.000007627027,"threshold_uncertainty_score":0.48364484},"labels":[],"label_agreement":null},{"id":"W2045715296","doi":"10.5539/mas.v4n8p33","title":"Application of Differential Evolution for Congestion Management in Power System","year":2010,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Congestion management; Particle swarm optimization; Differential evolution; Computer science; Reliability (semiconductor); Electric power system; Mathematical optimization; Electricity market; Database transaction; Electricity; Differential (mechanical device); Work (physics); Order (exchange); Management system; Operations research; Reliability engineering; Power (physics); Algorithm; Operations management; Mathematics; Business; Economics; Engineering; Electrical engineering","score_opus":0.0030846686611372977,"score_gpt":0.1921479679280912,"score_spread":0.1890632992669539,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045715296","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11818978,0.000008648232,0.8763162,0.0000032557095,0.00026291917,0.00073066354,0.0000021626747,0.000115466915,0.004370888],"genre_scores_gemma":[0.9947009,6.719327e-7,0.0049764398,0.0000011011563,0.000013678441,0.00028355385,0.0000041224152,0.0000114966715,0.000008033747],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991619,0.000003344416,0.00021062713,0.00021051789,0.0002236665,0.00018992423],"domain_scores_gemma":[0.999631,0.000012982861,0.000050704744,0.00022499997,0.00004803322,0.000032286145],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030471614,0.000079525584,0.00010202823,0.00022918206,0.000046700407,0.00001963548,0.00020577699,0.000052319294,0.0000010579216],"category_scores_gemma":[0.0000048281668,0.00008458894,0.000014614545,0.00044151326,0.000053702843,0.00009761003,0.000019781704,0.000066770655,0.0000039421043],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009945243,0.000018490522,0.00013625331,0.000119811964,0.000003519931,9.195507e-8,0.00012062784,0.040565763,0.86436313,0.08926424,0.000005924367,0.005392194],"study_design_scores_gemma":[0.0002787583,0.0000071434392,0.0053768926,0.000010184262,0.000005495778,0.000001147235,0.000026373049,0.98130894,0.012342896,0.0005452068,0.000013662657,0.000083298546],"about_ca_topic_score_codex":0.0000042188967,"about_ca_topic_score_gemma":0.000013079274,"teacher_disagreement_score":0.94074315,"about_ca_system_score_codex":0.00018190291,"about_ca_system_score_gemma":0.000014865992,"threshold_uncertainty_score":0.34494367},"labels":[],"label_agreement":null},{"id":"W2048939653","doi":"10.1109/pesgm.2014.6939482","title":"Multi-scene security constrained economic dispatch with rational wind power curtailment in micro-grid","year":2014,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Wind power; Economic dispatch; Grid; Computer science; Spinning; Reliability (semiconductor); Power (physics); Power grid; Reliability engineering; Electric power system; Range (aeronautics); Wind speed; Mathematical optimization; Engineering; Electrical engineering; Meteorology; Mathematics; Geography","score_opus":0.0032755357306799597,"score_gpt":0.18183909598541453,"score_spread":0.17856356025473458,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2048939653","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7755655,0.00007942419,0.21064042,0.00021538476,0.00059511117,0.0006033146,0.000025345176,0.00031250928,0.0119629735],"genre_scores_gemma":[0.98744446,0.000006418177,0.012288204,0.000039056198,0.00004501089,0.000015040068,0.00004003367,0.000025555872,0.00009622569],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992071,0.000030754283,0.00025990806,0.00019194037,0.00008160786,0.00022869617],"domain_scores_gemma":[0.99968296,0.00004050549,0.000033880708,0.0001596893,0.000021232105,0.00006173433],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016706537,0.00015448866,0.00017482029,0.00009334299,0.000023048484,0.00003466462,0.00008719104,0.00006622883,0.00023796887],"category_scores_gemma":[0.000007910644,0.0001420972,0.000022604883,0.0000909548,0.000022790546,0.00014387695,0.000010924652,0.0001015469,0.00006848895],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049288767,0.00018690222,0.08688983,0.000098920566,0.00013436566,0.000008062387,0.0010538935,0.8951181,0.009796648,0.002301634,0.0038738586,0.0004884721],"study_design_scores_gemma":[0.0021044046,0.00006992904,0.012431083,0.000038514758,0.000007936841,0.000017423625,0.00004654252,0.9779368,0.005585291,0.000023231616,0.0013857685,0.0003530406],"about_ca_topic_score_codex":0.00005447392,"about_ca_topic_score_gemma":0.0005605029,"teacher_disagreement_score":0.21187894,"about_ca_system_score_codex":0.00021295523,"about_ca_system_score_gemma":0.0000407085,"threshold_uncertainty_score":0.57945555},"labels":[],"label_agreement":null},{"id":"W2049816691","doi":"10.1016/s0301-4215(02)00331-2","title":"Deregulated power prices: comparison of diurnal patterns","year":2003,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"University of Alberta","keywords":"Incentive; Economics; Consumption (sociology); Market power; Market price; Econometrics; Microeconomics; Business; Monetary economics","score_opus":0.0066437289222762725,"score_gpt":0.2296884580782942,"score_spread":0.22304472915601792,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2049816691","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30202633,0.0015078784,0.55518585,0.000046601603,0.0005875106,0.000109495115,0.000010751586,0.00046792655,0.14005765],"genre_scores_gemma":[0.9990587,0.00002533295,0.00054537854,0.000025107376,0.00003721674,0.000005118016,0.000008552313,0.00003175552,0.00026279988],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99922526,0.00003394355,0.0002857493,0.000092183356,0.00013614948,0.00022668777],"domain_scores_gemma":[0.9996256,0.000023679202,0.00006486612,0.00018636133,0.000035562047,0.000063900945],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000053446238,0.0001169533,0.00018738458,0.00019996529,0.000022647448,0.000012641154,0.00010157578,0.00007872936,0.00008162969],"category_scores_gemma":[0.000029643435,0.00011842796,0.000041117884,0.0004211635,0.000009719767,0.00007121959,0.000007370088,0.000061095525,0.000005999316],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007840229,0.00016310171,0.014924268,0.0001227098,0.00025603478,0.000004810346,0.0018767451,0.79085046,0.0077488036,0.17803372,0.0032129586,0.0027985314],"study_design_scores_gemma":[0.0026439757,0.00034186474,0.02116293,0.00032286253,0.00008153425,0.00009951132,0.00030393637,0.3517428,0.52570885,0.0011725837,0.09486672,0.001552415],"about_ca_topic_score_codex":0.00018718778,"about_ca_topic_score_gemma":0.000029879904,"teacher_disagreement_score":0.6970324,"about_ca_system_score_codex":0.000083880535,"about_ca_system_score_gemma":0.000035488123,"threshold_uncertainty_score":0.4829352},"labels":[],"label_agreement":null},{"id":"W2050002896","doi":"10.1016/j.enpol.2003.09.001","title":"Corrigendum to “Deregulated power prices: comparison of diurnal patterns” [Energy Policy 32 (2004) 657–672]","year":2003,"lang":"en","type":"erratum","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Power (physics); Energy (signal processing); Economics; Environmental science; Natural resource economics; Environmental economics; Business; Mathematics; Thermodynamics; Physics; Statistics","score_opus":0.010548284690366267,"score_gpt":0.24373013421040718,"score_spread":0.23318184952004092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2050002896","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000345856,0.015583635,0.28079945,0.00068755954,0.07798628,0.00069720246,0.00063575304,0.0018056289,0.62145865],"genre_scores_gemma":[0.38591576,0.001833573,0.0011368076,0.0017133246,0.009490243,0.00023197666,0.0027376837,0.0012780037,0.59566265],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99487734,0.0001914265,0.0016679941,0.0007851303,0.0009665279,0.0015115674],"domain_scores_gemma":[0.99702865,0.00004120187,0.0006629426,0.0013071079,0.0003327855,0.00062732236],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.00017799789,0.0011507444,0.0016567024,0.0028675203,0.00013285391,0.00012940113,0.0010412048,0.001383486,0.00030318522],"category_scores_gemma":[0.00016813944,0.0012523911,0.00035188417,0.003235057,0.000055537395,0.0002002461,0.0001408163,0.00078230095,0.000042352036],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001695379,0.00012938112,0.000072880524,0.00024768413,0.0004328885,0.000014544938,0.0005561829,0.059606228,0.00016462439,0.013300033,0.9234252,0.0020334],"study_design_scores_gemma":[0.0006016891,0.00023215242,0.00022800548,0.0006173071,0.00008661373,0.000047464437,0.000045314657,0.019608,0.002556839,0.00014080376,0.97447324,0.0013625773],"about_ca_topic_score_codex":0.01009733,"about_ca_topic_score_gemma":0.0008762754,"teacher_disagreement_score":0.3855699,"about_ca_system_score_codex":0.0015380925,"about_ca_system_score_gemma":0.0011010307,"threshold_uncertainty_score":0.9999129},"labels":[],"label_agreement":null},{"id":"W2050003741","doi":"10.1109/tpwrs.2014.2336753","title":"Online Adaptive Real-Time Optimal Dispatch of Privately Owned Energy Storage Systems Using Public-Domain Electricity Market Prices","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University","funders":"","keywords":"Electricity market; Electricity; Revenue; Linear programming; Computer science; Economic dispatch; Energy storage; Mathematical optimization; Arbitrage; Economics; Operations research; Electric power system; Engineering; Finance; Algorithm; Mathematics","score_opus":0.011001363782216899,"score_gpt":0.20236840541635998,"score_spread":0.1913670416341431,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2050003741","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05720013,0.0002973157,0.9353867,0.0000116449255,0.0023415969,0.00074094435,0.00017882453,0.00069302705,0.003149824],"genre_scores_gemma":[0.9959378,0.00009232712,0.0028553472,0.000005869091,0.000070234186,0.00011160248,0.000021845095,0.00017365962,0.0007313013],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9960548,0.00057665067,0.0012273663,0.00058471237,0.0007712751,0.0007851601],"domain_scores_gemma":[0.9978033,0.00033872086,0.00045190981,0.0007998202,0.000342066,0.00026423126],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008586318,0.0005861417,0.0009855874,0.0008147928,0.00019799358,0.00015924075,0.0004736563,0.00039296225,0.00004903731],"category_scores_gemma":[0.000017367769,0.00058020605,0.0002152839,0.0014736282,0.00005864728,0.00055108627,0.00000388542,0.00034631463,0.0000151197655],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000110347515,0.00035503873,0.0000150742835,0.0002851252,0.00042608558,0.0000074332493,0.00028954755,0.97974205,0.017625298,0.00045906994,0.00055407494,0.00013088428],"study_design_scores_gemma":[0.00073339854,0.00041275923,0.00004406285,0.0003144894,0.000086088214,0.00007569211,0.0001627137,0.9926834,0.003558949,0.0000031390741,0.0013339008,0.000591389],"about_ca_topic_score_codex":0.00089038804,"about_ca_topic_score_gemma":0.000033933105,"teacher_disagreement_score":0.9387377,"about_ca_system_score_codex":0.0007305458,"about_ca_system_score_gemma":0.00011582367,"threshold_uncertainty_score":0.99966496},"labels":[],"label_agreement":null},{"id":"W2051556306","doi":"10.1109/tpwrs.2012.2235469","title":"Analysis of the Iberian Power Forward Price Formation","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Futures contract; Spot contract; Forward contract; Forward market; Common value auction; Maturity (psychological); Quarter (Canadian coin); Economics; Normal backwardation; Spot market; Financial economics; Futures market; Derivatives market; Business; Microeconomics; Electricity; Engineering","score_opus":0.004796734193670058,"score_gpt":0.1803990078667938,"score_spread":0.17560227367312375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2051556306","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028925238,0.000097513795,0.9599285,0.00004029016,0.0024627894,0.00079697097,0.000035003734,0.00023209472,0.0074815615],"genre_scores_gemma":[0.9990279,0.000011900834,0.000078383266,0.000019516758,0.0000050850463,0.00017317238,0.0000035513092,0.000036030116,0.0006444259],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985233,0.00009254615,0.00058648025,0.00016789896,0.0003665801,0.00026318754],"domain_scores_gemma":[0.99896425,0.000067850124,0.0001426237,0.0005902823,0.00016243663,0.00007255546],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018068247,0.00019716329,0.0003422013,0.0004983349,0.000100523954,0.000073038,0.00025168757,0.00013766429,0.0002080987],"category_scores_gemma":[0.000004392263,0.00015488085,0.00026220505,0.0019494838,0.000020858346,0.00045204253,9.349094e-7,0.0001638288,0.00010627116],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004359243,0.00004636051,0.00007935266,0.00007498395,0.00082741346,2.5130063e-7,0.0011588975,0.9935847,0.002852377,0.00006414227,0.0011983066,0.000108889086],"study_design_scores_gemma":[0.00045443722,0.00010504382,0.0025245033,0.0001349026,0.0006790201,0.000018390738,0.000523145,0.9765517,0.016094746,0.0000057964694,0.0024692316,0.00043904784],"about_ca_topic_score_codex":0.000100181285,"about_ca_topic_score_gemma":0.000022905708,"teacher_disagreement_score":0.97010267,"about_ca_system_score_codex":0.00020260234,"about_ca_system_score_gemma":0.000018303108,"threshold_uncertainty_score":0.6315858},"labels":[],"label_agreement":null},{"id":"W2054097401","doi":"10.1109/eem.2012.6254726","title":"Challenges and opportunities of a trans-canadian grid","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"","keywords":"Reliability (semiconductor); Grid; Interconnection; Computer science; Power grid; Network topology; Point (geometry); Control (management); Reliability engineering; Power (physics); Operations research; Environmental economics; Risk analysis (engineering); Systems engineering; Engineering; Telecommunications; Business; Computer network; Mathematics","score_opus":0.05028495973642108,"score_gpt":0.2029757672812167,"score_spread":0.1526908075447956,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2054097401","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020349396,0.06760295,0.008992573,0.0004845352,0.0005066603,0.00017127306,0.000008040456,0.00021553198,0.901669],"genre_scores_gemma":[0.99470615,0.0048145885,0.00030110186,0.000011791643,0.000033108056,0.0000034468464,0.0000016825416,0.000008939678,0.00011919449],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99973714,0.0000063123816,0.000069361,0.000026447218,0.000033801516,0.0001269539],"domain_scores_gemma":[0.99982476,0.000009146103,0.000005181088,0.000052793806,0.00000952199,0.00009857029],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007524632,0.000041786054,0.000063206666,0.00008127214,0.0000070855326,0.0000023597197,0.000022694412,0.000029927847,0.000037034282],"category_scores_gemma":[0.0000019950737,0.000040835243,0.000007647214,0.000022006032,0.000006613197,0.0001075859,0.0000012002002,0.000019497307,0.0000017019001],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006701674,0.000060251496,0.0021112827,0.0016885867,0.00033807056,0.000007652951,0.029976351,0.0029669108,0.0020508997,0.19613819,0.009121705,0.7555334],"study_design_scores_gemma":[0.002362223,0.0004055138,0.072591536,0.00042650782,0.00023496796,0.00035104115,0.009329341,0.11711605,0.031854674,0.0005497628,0.76212084,0.0026575478],"about_ca_topic_score_codex":0.0003482561,"about_ca_topic_score_gemma":0.0022871972,"teacher_disagreement_score":0.9743568,"about_ca_system_score_codex":0.000013840738,"about_ca_system_score_gemma":0.000008765466,"threshold_uncertainty_score":0.1665213},"labels":[],"label_agreement":null},{"id":"W2055886247","doi":"10.3138/cpp.v33.1.001","title":"The Potential for Electricity Market Restructuring in Quebec","year":2007,"lang":"en","type":"article","venue":"Canadian Public Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Center for Interuniversity Research and Analysis on Organizations; University of Alberta; HEC Montréal","funders":"","keywords":"Restructuring; Divestment; Hydroelectricity; Revenue; Electricity; Electricity market; Production (economics); Business; Economics; Market economy; Industrial organization; Natural resource economics; Microeconomics; Finance; Engineering","score_opus":0.004325274596356654,"score_gpt":0.201432071138736,"score_spread":0.19710679654237936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2055886247","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49134848,0.0038825024,0.21613947,0.01854948,0.00443071,0.0045209215,0.00017028734,0.0013228741,0.2596353],"genre_scores_gemma":[0.9974833,0.000023954286,0.00017955809,0.00014972007,0.00037337825,0.00002777132,0.000009791851,0.00003548332,0.001717038],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.998512,0.000023919782,0.00024873213,0.0001308296,0.00009752084,0.0009869763],"domain_scores_gemma":[0.999259,0.000096915064,0.000027277245,0.0002203204,0.00004935808,0.00034715622],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005965748,0.00011783841,0.00010236504,0.0008123466,0.00018005274,0.0001621423,0.00026836823,0.00011073133,0.000010506211],"category_scores_gemma":[0.00037606875,0.000113340066,0.0000379701,0.001012209,0.000020833933,0.0001703899,0.000007477153,0.00014353383,0.0000035558014],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050129984,0.00001567938,0.003724828,0.00015547614,0.00016606438,0.00008479485,0.00052526227,0.012516292,0.000730191,0.1468573,0.16149215,0.6736818],"study_design_scores_gemma":[0.0014270319,0.000043998436,0.119286865,0.000030382236,0.000013547487,0.00008976655,0.00010913732,0.26029804,0.0008986207,0.0031936252,0.61370474,0.00090421806],"about_ca_topic_score_codex":0.4550638,"about_ca_topic_score_gemma":0.9597417,"teacher_disagreement_score":0.6727776,"about_ca_system_score_codex":0.00210013,"about_ca_system_score_gemma":0.0012947385,"threshold_uncertainty_score":0.54917675},"labels":[],"label_agreement":null},{"id":"W2058448998","doi":"10.1109/ccece.2012.6334860","title":"Multi-objective economic-emission optimal load dispatch using bacterial foraging algorithm","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Foraging; Mathematical optimization; Set (abstract data type); Convergence (economics); Minification; Computer science; Curse of dimensionality; Algorithm; Mathematics; Artificial intelligence; Ecology; Biology; Economics","score_opus":0.01160223559356267,"score_gpt":0.23360313577846284,"score_spread":0.22200090018490018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2058448998","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14877957,0.00016958384,0.8471046,0.000004050631,0.0018010047,0.00020583175,0.000007641466,0.00034768027,0.0015800557],"genre_scores_gemma":[0.6632472,0.0000120850345,0.33593524,0.000006002413,0.00051060785,0.000011385153,0.000015396558,0.00006075708,0.00020131706],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896836,0.000027954291,0.00025748246,0.00016706219,0.00010166547,0.0004774432],"domain_scores_gemma":[0.9995744,0.000028688573,0.000045376706,0.00017023797,0.000031769323,0.0001495228],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022012742,0.00019518234,0.00019590811,0.000081749684,0.00007364705,0.000055205233,0.00009475324,0.000110633686,0.00016610447],"category_scores_gemma":[0.000013628644,0.00019631564,0.00005336571,0.00010129781,0.000009373554,0.0006897398,0.00003975506,0.00010610124,0.0000616641],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054541408,0.00020278349,0.0117282225,0.00017050489,0.00037728675,0.000007965984,0.004957745,0.7800916,0.14369898,0.000070060225,0.002894542,0.05574581],"study_design_scores_gemma":[0.00046019722,0.000010007805,0.00038464557,0.000023435061,0.000017394674,0.000021784836,0.000072252755,0.9749975,0.023028178,8.7125926e-7,0.0007281092,0.00025560384],"about_ca_topic_score_codex":0.00013535657,"about_ca_topic_score_gemma":0.0000054506763,"teacher_disagreement_score":0.51446766,"about_ca_system_score_codex":0.0009164702,"about_ca_system_score_gemma":0.000047946385,"threshold_uncertainty_score":0.80055195},"labels":[],"label_agreement":null},{"id":"W2058602204","doi":"10.5430/air.v1n1p96","title":"Parallel hybrid enhanced inherited GA based scuc in a distributed cluster","year":2012,"lang":"en","type":"article","venue":"Artificial Intelligence Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Schedule; Economic dispatch; Power system simulation; Computer science; Genetic algorithm; Operator (biology); Mathematical optimization; Power (physics); Electric power system; Mathematics; Operating system","score_opus":0.0907725757499153,"score_gpt":0.3547781529685037,"score_spread":0.26400557721858836,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2058602204","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17328395,0.00039039325,0.82345825,0.00018128238,0.000314701,0.00064166926,0.000012584375,0.00021215958,0.0015049903],"genre_scores_gemma":[0.9980204,0.00004899666,0.0014469802,0.0000213191,0.0001427014,0.00017679288,0.000058279773,0.000044546854,0.000039967956],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971497,0.00033709983,0.00053246913,0.00025438907,0.0005674463,0.0011588632],"domain_scores_gemma":[0.99878395,0.00040164107,0.00002813565,0.00037045308,0.00020743208,0.00020839997],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019972837,0.00017586205,0.00021718844,0.00047709895,0.000098368655,0.00009391462,0.00031846346,0.00011677858,0.00025052257],"category_scores_gemma":[0.0005102397,0.0001849631,0.000051107203,0.0017005029,0.00008882326,0.0003341866,0.000053604097,0.0005499639,0.00076902215],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003116499,0.0006671835,0.0025073222,0.00026238023,0.000056134762,0.000031694744,0.0020164587,0.8798476,0.045322526,0.0034071933,0.0031284103,0.06244147],"study_design_scores_gemma":[0.000073005176,0.00005393079,0.00037050882,0.00007626931,0.000002891755,0.0000031878444,0.00022847527,0.80770737,0.18992776,0.0007342393,0.0005715199,0.00025087132],"about_ca_topic_score_codex":0.00011302444,"about_ca_topic_score_gemma":0.000107454456,"teacher_disagreement_score":0.8247365,"about_ca_system_score_codex":0.00038509854,"about_ca_system_score_gemma":0.000068568035,"threshold_uncertainty_score":0.988448},"labels":[],"label_agreement":null},{"id":"W2061540587","doi":"10.1109/ccece.2006.277592","title":"Emission-Economic Dispatch using a Novel Constraint Handling Particle Swarm Optimization Strategy","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Particle swarm optimization; Mathematical optimization; Economic dispatch; Pareto principle; Robustness (evolution); Computer science; Constraint (computer-aided design); Optimization problem; Multi-objective optimization; Mathematics; Electric power system; Power (physics)","score_opus":0.01191603412234981,"score_gpt":0.21322206375606606,"score_spread":0.20130602963371624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2061540587","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19681485,0.00009971049,0.7972841,0.0000141244245,0.00018449947,0.00015049826,0.000004668917,0.0003434727,0.0051040375],"genre_scores_gemma":[0.96620476,0.0000082706665,0.033465244,0.0000072712946,0.00009745144,0.000008022407,0.000016923364,0.00003821554,0.00015386466],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906486,0.000011786646,0.00035900672,0.00018037125,0.00008819392,0.00029575228],"domain_scores_gemma":[0.9996719,0.00003080428,0.000048928672,0.00014881663,0.00003063267,0.000068923815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001187608,0.00015191121,0.00015502945,0.000059219452,0.000074112235,0.00009478868,0.0000749781,0.000083891326,0.00015702206],"category_scores_gemma":[0.000007635547,0.00015669709,0.00003772282,0.00015574579,0.000017607856,0.00023785241,0.000011845039,0.00007138653,0.000014006957],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019599984,0.000017418512,0.00074120326,0.000016231685,0.000011890155,8.707788e-7,0.000017233282,0.9808008,0.01742436,0.000717328,0.00008550259,0.00016517717],"study_design_scores_gemma":[0.00037528703,0.000010826496,0.0000850562,0.000026144924,0.00001391116,0.000018598683,0.000039390186,0.9796612,0.019510668,0.00002763494,0.000038034523,0.00019324353],"about_ca_topic_score_codex":0.00026470164,"about_ca_topic_score_gemma":0.000033121807,"teacher_disagreement_score":0.76938987,"about_ca_system_score_codex":0.0002464355,"about_ca_system_score_gemma":0.000053583808,"threshold_uncertainty_score":0.6389922},"labels":[],"label_agreement":null},{"id":"W2061895839","doi":"10.6000/1929-6002.2014.03.03.6","title":"Transmission System Operation Challenges with Large Wind Penetration","year":2014,"lang":"en","type":"article","venue":"Journal of Technology Innovations in Renewable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Renewable energy; Wind power; Incentive; Electric power system; Transmission system; Engineering; Market penetration; Environmental science; Penetration (warfare); Computer science; Telecommunications; Electrical engineering; Transmission (telecommunications); Operations research; Power (physics); Economics","score_opus":0.004939244220721082,"score_gpt":0.18791620907785608,"score_spread":0.182976964857135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2061895839","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023536887,0.0014315125,0.9685285,0.0007398713,0.0002620881,0.000079089594,7.3906784e-7,0.00020326769,0.0052180295],"genre_scores_gemma":[0.98812014,0.00037774202,0.011314759,0.000013060756,0.00007171923,0.000010681603,0.0000072108264,0.000027170427,0.000057522735],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988092,0.000043447923,0.0006353623,0.000117710406,0.00019448528,0.00019976075],"domain_scores_gemma":[0.9992575,0.000027083004,0.00020713682,0.00019321617,0.00029018873,0.000024845147],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050790387,0.0001369803,0.00025564674,0.0015537972,0.00006493865,0.00002216074,0.00018985114,0.00025854676,0.0000059220083],"category_scores_gemma":[0.00003432076,0.00011897245,0.000021653477,0.0015323168,0.000018415774,0.00032278735,0.000008126443,0.0002017048,8.852281e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013678987,0.0000464367,0.00035553068,0.00006693298,0.000039594495,0.000007556967,0.00006748723,0.93878466,0.009130458,0.038327504,0.00034354988,0.0128166275],"study_design_scores_gemma":[0.0033410317,0.0009526705,0.0007528972,0.0010786051,0.000055958222,0.00085863663,0.00094868377,0.83981633,0.086723745,0.0016401948,0.06326233,0.0005688915],"about_ca_topic_score_codex":0.00001618303,"about_ca_topic_score_gemma":0.00018002816,"teacher_disagreement_score":0.9645832,"about_ca_system_score_codex":0.0002233952,"about_ca_system_score_gemma":0.00005754104,"threshold_uncertainty_score":0.48515558},"labels":[],"label_agreement":null},{"id":"W2063317738","doi":"10.6000/1929-6002.2014.03.03.3","title":"Generation Scheduling in Power Systems with Hydro Electric Plants","year":2014,"lang":"en","type":"article","venue":"Journal of Technology Innovations in Renewable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electrical engineering; Environmental science; Computer science; Automotive engineering; Engineering","score_opus":0.007292977366765218,"score_gpt":0.20044931303182123,"score_spread":0.19315633566505602,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2063317738","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4913216,0.00095676654,0.5053818,0.00012169291,0.00043713028,0.000068506124,4.6206569e-7,0.00009989012,0.0016121635],"genre_scores_gemma":[0.99351406,0.0001308962,0.0061690346,0.000019492429,0.00005667855,0.0000220792,0.000005126154,0.000029507408,0.00005314321],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985589,0.000041247386,0.0008103969,0.00012749848,0.00019142027,0.00027058274],"domain_scores_gemma":[0.9992489,0.00003753502,0.0002787363,0.00020717646,0.00020593045,0.000021671087],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005029074,0.00014726669,0.00031500982,0.0037271008,0.000036028727,0.000029890392,0.00022594229,0.00026939597,0.0000030175731],"category_scores_gemma":[0.00012119102,0.00013789935,0.000017175282,0.0040972726,0.000017029839,0.0002540617,0.000012251858,0.0003175967,8.7458164e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000067398237,0.000029971665,0.0029490436,0.000009375529,0.000026481302,0.000014049807,0.000016097367,0.9675013,0.024599161,0.0038280739,0.00028920974,0.0007305053],"study_design_scores_gemma":[0.0009176451,0.00021935231,0.00019008019,0.00021407596,0.0000072495177,0.00040109074,0.00006719751,0.96657574,0.028353103,0.0005062419,0.0023326098,0.00021559013],"about_ca_topic_score_codex":0.00009665373,"about_ca_topic_score_gemma":0.00030422484,"teacher_disagreement_score":0.50219244,"about_ca_system_score_codex":0.00033392193,"about_ca_system_score_gemma":0.00008141089,"threshold_uncertainty_score":0.5623372},"labels":[],"label_agreement":null},{"id":"W2067755615","doi":"10.1109/naps.2012.6336376","title":"Frequency regulation services: A comparative study of select North American and European reserve markets","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Procurement; Electricity; Business; Quality (philosophy); Service (business); Electricity market; Industrial organization; Marketing; Engineering","score_opus":0.01228375453937455,"score_gpt":0.2229072884483076,"score_spread":0.21062353390893304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2067755615","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9789874,0.00013646831,0.0025993844,0.000002167366,0.000043315416,0.0003088914,0.0000016927429,0.00014325533,0.017777406],"genre_scores_gemma":[0.99868584,0.000008831985,0.0011874759,0.000004257055,0.000029165982,0.0000075200765,0.000011067856,0.0000204018,0.00004546326],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991612,0.0001969637,0.0002364552,0.000103564314,0.00013029164,0.00017156062],"domain_scores_gemma":[0.99958646,0.00003989283,0.00007737999,0.00016984453,0.000066141605,0.00006025184],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022103278,0.00010871468,0.00018351462,0.0000961556,0.000029127266,0.000013260318,0.0000770686,0.000010720064,0.000012058961],"category_scores_gemma":[0.0000047298117,0.000100998,0.000010908342,0.0005601878,0.00001290632,0.0002519927,0.000018986737,0.000056959514,0.0000069307475],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000113064825,0.00015821544,0.9805416,0.00010149122,0.00011296818,6.939034e-7,0.011109239,0.0063388105,0.0007911785,0.00003403317,0.00018124201,0.0006192064],"study_design_scores_gemma":[0.0002650233,0.00013075833,0.9567372,0.000012067902,0.000020607304,0.0000029246812,0.0009272344,0.04144288,0.00032259786,0.0000016737495,0.000017242775,0.00011975043],"about_ca_topic_score_codex":0.00026081855,"about_ca_topic_score_gemma":0.0013359045,"teacher_disagreement_score":0.03510407,"about_ca_system_score_codex":0.0000349952,"about_ca_system_score_gemma":0.0000033360366,"threshold_uncertainty_score":0.41185787},"labels":[],"label_agreement":null},{"id":"W2067967009","doi":"10.1016/j.ijpe.2010.10.007","title":"Financial and operational decisions in the electricity sector: Contract portfolio optimization with the conditional value-at-risk criterion","year":2010,"lang":"en","type":"article","venue":"International Journal of Production Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canada Research Chairs; University of New Brunswick; University of Toronto","funders":"","keywords":"CVAR; Expected shortfall; Forward contract; Stochastic programming; Procurement; Portfolio; Hedge; Value at risk; Portfolio optimization; Risk management; Volatility (finance); Electricity; Robust optimization; Microeconomics; Computer science; Economics; Business; Mathematical optimization; Actuarial science; Finance; Futures contract","score_opus":0.005308610124878929,"score_gpt":0.20585211258120406,"score_spread":0.20054350245632513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2067967009","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91315377,0.00011330085,0.082229756,0.0022816723,0.0017701888,0.00021123368,0.000024893157,0.000014764337,0.00020040007],"genre_scores_gemma":[0.99581325,0.0005765842,0.002437625,0.00017972023,0.0009109206,0.000012371126,0.000033578013,0.000015119244,0.000020839974],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989823,0.00007853356,0.00045293922,0.00013480904,0.0002365058,0.00011487395],"domain_scores_gemma":[0.99900264,0.00020239464,0.0002970102,0.00011494149,0.00035361387,0.000029384824],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010529471,0.0001186984,0.00013066894,0.00023064432,0.00013063234,0.00013425147,0.00026027512,0.00006878597,0.00005820202],"category_scores_gemma":[0.0004096079,0.00008019998,0.00004242006,0.00014298873,0.000054861783,0.0005824397,0.000014753406,0.00042836956,0.000002134069],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010007522,0.000043684107,0.004599439,0.0000014111148,0.00006353273,0.0000047209733,0.000303105,0.988299,0.0007956117,0.0025276097,0.0016454938,0.0016163304],"study_design_scores_gemma":[0.002336131,0.00024105258,0.13062714,0.00004713426,0.000100040335,0.005821147,0.0001256608,0.83973855,0.0037027155,0.0024369087,0.014371516,0.00045199503],"about_ca_topic_score_codex":0.00001393785,"about_ca_topic_score_gemma":0.0001977633,"teacher_disagreement_score":0.14856043,"about_ca_system_score_codex":0.00018913299,"about_ca_system_score_gemma":0.0001226136,"threshold_uncertainty_score":0.327046},"labels":[],"label_agreement":null},{"id":"W2069999654","doi":"10.1016/j.eneco.2014.09.001","title":"Efficiency assessment of hydroelectric power plants in Canada: A multi criteria decision making approach","year":2014,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa","funders":"National Key Research and Development Program of China; China Scholarship Council; National Natural Science Foundation of China","keywords":"Hydropower; Environmental economics; Viewpoints; Efficient energy use; Electricity generation; Business; Profitability index; Renewable energy; Economic efficiency; Production (economics); Electricity; Economics; Environmental resource management; Power (physics); Engineering; Finance; Microeconomics","score_opus":0.005290216809612416,"score_gpt":0.20059297862513975,"score_spread":0.19530276181552733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2069999654","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5149105,0.00009901671,0.47882953,0.0000014204726,0.00031658076,0.00005151597,0.0000048846405,0.000025595858,0.0057609095],"genre_scores_gemma":[0.989373,0.000042625612,0.010489022,0.000017381737,0.000016858512,0.000012418174,0.000010108205,0.00002884304,0.000009696394],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906564,0.000031791664,0.00040812048,0.00018240366,0.00006480606,0.0002472334],"domain_scores_gemma":[0.99957424,0.000087399836,0.00008049996,0.00020722585,0.000013086623,0.000037569083],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019760264,0.00013060313,0.00025147846,0.00021015457,0.000017964141,0.000014659417,0.0001728053,0.00005941431,0.000010634098],"category_scores_gemma":[0.000018871528,0.00014942333,0.000023920182,0.00016734684,0.0000048612546,0.00007672265,0.000020724025,0.00007343772,3.0087404e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000038545713,0.000024788289,0.005506109,0.000014089619,0.000011919374,8.5698997e-7,0.000037805843,0.9883918,0.00011615552,0.0005241997,0.00008378176,0.005284642],"study_design_scores_gemma":[0.00030709556,0.000016905755,0.0037237173,0.000023534778,0.000002207443,0.000005545859,0.00001527503,0.9951322,0.0003344416,0.000027789778,0.0002674887,0.00014378922],"about_ca_topic_score_codex":0.03186046,"about_ca_topic_score_gemma":0.13586421,"teacher_disagreement_score":0.4744625,"about_ca_system_score_codex":0.0009615006,"about_ca_system_score_gemma":0.00017976789,"threshold_uncertainty_score":0.9745865},"labels":[],"label_agreement":null},{"id":"W2070544587","doi":"10.5539/ass.v8n3p3","title":"Benchmarking Electric Distribution Utilities in the Philippines","year":2012,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Yardstick; Benchmarking; Flexibility (engineering); Competition (biology); Distribution (mathematics); Commission; Benchmark (surveying); Economics; Business; Industrial organization; Public economics; Microeconomics; Environmental economics; Marketing; Finance","score_opus":0.00825239921251893,"score_gpt":0.22667661945140688,"score_spread":0.21842422023888794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2070544587","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24160224,0.0017531826,0.05070707,0.00077025313,0.0021713753,0.00073073665,0.000010983055,0.00047135353,0.7017828],"genre_scores_gemma":[0.999599,0.000010119108,0.00004017111,0.000020649659,0.00029510795,0.000015664238,0.000004913286,0.0000044299113,0.00000997325],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9990618,0.000037355017,0.000117539894,0.00008411499,0.00027743424,0.0004217274],"domain_scores_gemma":[0.99982184,0.000026595833,0.000020782478,0.00007824303,0.00002310774,0.000029420227],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00082609337,0.000067027235,0.00006563842,0.00007059167,0.00025933125,0.000059004047,0.00024308513,0.000035372337,0.00000897477],"category_scores_gemma":[0.000056422552,0.000055149798,0.00001909848,0.0019572775,0.00007171755,0.0004668406,0.000012219585,0.00009515289,0.000007889656],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006527888,0.00013733363,0.040788036,0.00009340152,0.00001671521,0.0000035591788,0.0576841,0.00031032792,0.0072547365,0.16052134,0.005787966,0.72739595],"study_design_scores_gemma":[0.0002020117,0.000032932065,0.9703291,0.000023946193,0.000012261046,0.000020666092,0.0026674957,0.015244469,0.0018786016,0.0009122429,0.008272443,0.00040380657],"about_ca_topic_score_codex":0.000010392754,"about_ca_topic_score_gemma":0.0000055749306,"teacher_disagreement_score":0.9295411,"about_ca_system_score_codex":0.00021878078,"about_ca_system_score_gemma":0.000027997521,"threshold_uncertainty_score":0.22489436},"labels":[],"label_agreement":null},{"id":"W2070915220","doi":"10.1109/epec.2011.6070192","title":"Bacterial foraging algorithm for optimum economic-emission dispatch","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Foraging; Mathematical optimization; Convergence (economics); Curse of dimensionality; Computer science; Economic dispatch; Evolutionary algorithm; Power (physics); Algorithm; Electric power system; Mathematics; Artificial intelligence; Ecology; Economics","score_opus":0.011620334737992084,"score_gpt":0.20084702590392842,"score_spread":0.18922669116593632,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2070915220","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0052775163,0.000030423907,0.9736973,0.000007683966,0.0012825297,0.00029161578,0.000010295869,0.0003998719,0.019002777],"genre_scores_gemma":[0.4601256,0.00003608827,0.53716314,0.000021251708,0.00054335763,0.00015280895,0.00008843804,0.00012600157,0.0017433446],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993943,0.00000648188,0.00019739539,0.0001390632,0.000035801993,0.00022698793],"domain_scores_gemma":[0.9997268,0.000020439695,0.000024620445,0.00014587448,0.000016721244,0.00006554445],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000979169,0.000115940136,0.00012912518,0.00005792727,0.000037037677,0.000026500607,0.000103215745,0.000069521935,0.0002868675],"category_scores_gemma":[0.000004398983,0.0001130338,0.000045152214,0.000042154064,0.0000044991993,0.00020147552,0.000014587302,0.000037425307,0.0000338025],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012432468,0.00015644888,0.0014875977,0.0004449614,0.00047275377,0.000010644332,0.0032225957,0.049456846,0.021322764,0.0029759752,0.104889035,0.81543607],"study_design_scores_gemma":[0.00040229928,0.00003340912,0.000038041995,0.0000123151085,0.000010206343,0.0000043724344,0.000017651168,0.96549135,0.029577041,0.00009000481,0.0041437033,0.00017959853],"about_ca_topic_score_codex":0.000027669625,"about_ca_topic_score_gemma":0.0000040567897,"teacher_disagreement_score":0.9160345,"about_ca_system_score_codex":0.00010510366,"about_ca_system_score_gemma":0.000014400091,"threshold_uncertainty_score":0.46093845},"labels":[],"label_agreement":null},{"id":"W2071941548","doi":"10.1049/iet-rpg:20070082","title":"Impact of wind generation control strategies, penetration level and installation location on electricity market prices","year":2008,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Electric Power System Optimization","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity market; Wind power; Electric power system; Electricity; Market clearing; Stand-alone power system; Clearing; Power flow; Electricity generation; Computer science; Environmental economics; Business; Distributed generation; Economics; Engineering; Microeconomics; Power (physics); Renewable energy; Electrical engineering; Finance","score_opus":0.022430409115758068,"score_gpt":0.2287546829620683,"score_spread":0.20632427384631025,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2071941548","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6385628,0.00048361436,0.35658824,0.0000131410725,0.00023468386,0.0005020768,0.000019930654,0.000115733295,0.0034797958],"genre_scores_gemma":[0.99759483,0.0003408104,0.0012307463,0.000018054672,0.00024562722,0.000029417351,0.00032804962,0.000044818582,0.00016765585],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982701,0.00012199698,0.0005860186,0.0003455581,0.00039848033,0.0002778534],"domain_scores_gemma":[0.99899495,0.000049814254,0.00023401961,0.0002779863,0.0003599142,0.00008331311],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00034376435,0.00029644644,0.00029108353,0.00035170786,0.00019041487,0.00011074195,0.000087184446,0.00022385498,0.000056614015],"category_scores_gemma":[0.00006211107,0.00030023893,0.00006329861,0.0006683028,0.00003286158,0.0009891446,0.0000067935002,0.00011789387,0.0000041991393],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038719063,0.000050584305,0.002118147,0.000021122496,0.0000657354,8.9795714e-7,0.00024048476,0.78794175,0.20576097,0.00019297659,0.0032086817,0.00035992503],"study_design_scores_gemma":[0.0010085448,0.0005584851,0.0504504,0.000020624197,0.000031975356,0.000026349775,0.0000128423935,0.9175891,0.029852493,0.00003056778,0.00009544011,0.00032316954],"about_ca_topic_score_codex":0.000350134,"about_ca_topic_score_gemma":0.0003762911,"teacher_disagreement_score":0.35903206,"about_ca_system_score_codex":0.0003181172,"about_ca_system_score_gemma":0.00026082766,"threshold_uncertainty_score":0.999945},"labels":[],"label_agreement":null},{"id":"W2073064074","doi":"10.1109/tpwrs.2012.2233502","title":"Managing Uncertainty of Wind Energy With Wind Generators Cooperative","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Renewable energy; Wind power; Variable renewable energy; Electricity; Tariff; Economics; Sensitivity (control systems); Smoothing; Incentive; Environmental economics; Computer science; Electric power system; Econometrics; Engineering; Microeconomics; Power (physics); Electrical engineering","score_opus":0.004823537202650046,"score_gpt":0.17470068908952288,"score_spread":0.16987715188687283,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2073064074","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025759807,0.0002732933,0.9667542,0.00002268845,0.0014189102,0.00047616742,0.0000222064,0.00026453967,0.005008215],"genre_scores_gemma":[0.9988047,0.000039514834,0.00018427685,0.000020456862,0.000017189166,0.00007710532,0.0000044836424,0.00007406723,0.0007782079],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99857825,0.00009086299,0.00044203008,0.00026270768,0.00030776992,0.0003183745],"domain_scores_gemma":[0.99916345,0.00005911739,0.00008425939,0.0003721619,0.00020749414,0.00011349569],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009984343,0.00028438552,0.00036238547,0.00029540618,0.00009891898,0.00007771915,0.00015649814,0.00012556001,0.000105852465],"category_scores_gemma":[0.0000011689386,0.0002456374,0.00006347361,0.0006288029,0.00004162939,0.00031095184,5.980519e-7,0.00016488285,0.000042987438],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011300558,0.000038198676,0.000011669404,0.000060937607,0.00021348111,0.0000033281713,0.0004237627,0.99521327,0.0029785805,0.00013631122,0.00062844326,0.00028074472],"study_design_scores_gemma":[0.001297238,0.00058543525,0.000044279204,0.00046866992,0.000101715916,0.000085904,0.00091726356,0.9233101,0.07026166,0.000010061004,0.002072624,0.0008450288],"about_ca_topic_score_codex":0.00059203454,"about_ca_topic_score_gemma":0.000048914222,"teacher_disagreement_score":0.9730449,"about_ca_system_score_codex":0.0001879895,"about_ca_system_score_gemma":0.00004451392,"threshold_uncertainty_score":0.9999996},"labels":[],"label_agreement":null},{"id":"W2074210939","doi":"10.1016/j.epsr.2007.12.005","title":"Balancing risk and cost in fuzzy economic dispatch including wind power penetration based on particle swarm optimization","year":2008,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":133,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Pratt and Whitney Canada; National Science Foundation","keywords":"Wind power; Economic dispatch; Particle swarm optimization; Renewable energy; Electric power system; Reliability engineering; Fuzzy logic; Computer science; Energy security; Mathematical optimization; Engineering; Power (physics); Electrical engineering; Mathematics","score_opus":0.025975979711213865,"score_gpt":0.2741216598409217,"score_spread":0.2481456801297078,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2074210939","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8848726,0.0018196115,0.10133841,0.000047239922,0.0006135335,0.0018802285,0.000012062494,0.00029641087,0.009119872],"genre_scores_gemma":[0.9989262,0.0004292063,0.00019425695,0.00000825706,0.000063231935,0.00014967965,0.000019069641,0.000088628774,0.000121460616],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9964299,0.0006606383,0.0006769636,0.0005499613,0.0007002147,0.000982305],"domain_scores_gemma":[0.99851733,0.0005757886,0.000107905165,0.0004445276,0.00014450935,0.00020995026],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0024246788,0.0002895887,0.0003900664,0.0009611347,0.00037684687,0.00017801936,0.00023802352,0.00022647518,0.000026681219],"category_scores_gemma":[0.00030065796,0.00031231254,0.00004419976,0.0015442742,0.00004088569,0.00042603532,0.00003926429,0.0006996725,0.000082856255],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047429672,0.000048382564,0.028897423,0.00004617348,0.000019034253,0.000025245745,0.00044157915,0.96888435,0.00082373904,0.00007788899,0.00053357653,0.0001551677],"study_design_scores_gemma":[0.0010165417,0.00025712114,0.011367921,0.0001089251,0.000005119424,0.000035261874,0.0000691943,0.9850928,0.0015280849,0.0000063139432,0.00020351185,0.00030917895],"about_ca_topic_score_codex":0.0005267251,"about_ca_topic_score_gemma":0.00006390658,"teacher_disagreement_score":0.11405358,"about_ca_system_score_codex":0.0015964399,"about_ca_system_score_gemma":0.00021583439,"threshold_uncertainty_score":0.9999329},"labels":[],"label_agreement":null},{"id":"W2075548088","doi":"10.1109/cjece.2014.2359249","title":"Energy Reserve Trade Optimization for Wind Generators Using Black and Scholes Options in Small-Size Power Systems","year":2015,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Wind power; Renewable energy; Electric power system; Procurement; Computer science; Mathematical optimization; Environmental economics; Economics; Power (physics); Engineering; Electrical engineering; Mathematics","score_opus":0.014442499505428065,"score_gpt":0.1803252716876712,"score_spread":0.16588277218224315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2075548088","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.253493,0.0037921255,0.7421926,0.000031592634,0.00036073077,0.000097772165,0.0000028437987,0.000018724624,0.000010545774],"genre_scores_gemma":[0.97650194,0.00007102877,0.023241488,0.000014837844,0.00013221547,0.0000023009968,0.0000018097923,0.00003151775,0.000002849208],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99913275,0.00002726415,0.0003548135,0.00011261579,0.0000722634,0.00030029414],"domain_scores_gemma":[0.9992488,0.000084269035,0.000051119405,0.00006271222,0.00008099207,0.0004720913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021353357,0.00014405737,0.00024131201,0.00045399726,0.000034617686,0.000136471,0.00008783574,0.00010481756,6.463859e-7],"category_scores_gemma":[0.00005730618,0.00015144689,0.00003078036,0.00041565695,0.000011838779,0.00018990497,0.0000055932014,0.00015593594,4.4695494e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000033667257,0.0000032518287,0.0003599903,0.000025456622,0.000029591169,0.00001667091,0.000112234884,0.9984233,0.00010785438,0.00052120496,0.00013193546,0.00026516267],"study_design_scores_gemma":[0.00043893314,0.000108478525,0.00034573307,0.00009143434,0.000015232606,0.00018607148,0.0000110149595,0.9981593,0.00006986834,0.000016911485,0.00039709132,0.00015992971],"about_ca_topic_score_codex":0.0002889825,"about_ca_topic_score_gemma":0.00018882213,"teacher_disagreement_score":0.72300893,"about_ca_system_score_codex":0.00026707468,"about_ca_system_score_gemma":0.00016458576,"threshold_uncertainty_score":0.6175825},"labels":[],"label_agreement":null},{"id":"W2076306265","doi":"10.1109/pmaps.2006.360245","title":"Probabilistic Optimal Power Flow Applications to Electricity Markets","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; University of Calgary","funders":"","keywords":"Probabilistic logic; Monte Carlo method; Computer science; Mathematical optimization; Electricity market; Context (archaeology); Electricity; Power flow; Electric power system; Point (geometry); AC power; Power (physics); Mathematics; Engineering; Artificial intelligence; Statistics","score_opus":0.0033631217755519557,"score_gpt":0.18720475968732792,"score_spread":0.18384163791177596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2076306265","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0058943946,0.000099334444,0.8881376,0.00006228909,0.00008082251,0.0007582159,0.0000047709673,0.0007941888,0.10416842],"genre_scores_gemma":[0.947613,0.0000025872982,0.050005425,0.00003998125,0.000074285184,0.00036728752,0.000020931055,0.000040491614,0.0018360184],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991174,0.000015926438,0.00023060745,0.0001936209,0.000145276,0.00029717968],"domain_scores_gemma":[0.99954987,0.00004284333,0.00001548623,0.0002523619,0.00006716236,0.000072308336],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011043531,0.00013578004,0.00012400074,0.00013279902,0.000047277565,0.00004202257,0.00013728286,0.00006482131,0.00016409419],"category_scores_gemma":[0.000018852048,0.00013902762,0.00003278238,0.00074164884,0.0000061354554,0.00007860283,0.000013730098,0.00007661661,0.000257291],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000054888615,0.00004854772,0.00009597185,0.000029116309,0.000014354013,0.0000012193169,0.00001948863,0.95292574,0.0014015989,0.0030922464,0.04060523,0.0017609827],"study_design_scores_gemma":[0.00023062601,0.000046618476,0.002562243,0.000009529875,0.000017854141,0.000017965434,0.0000040449772,0.95663005,0.0034905681,0.00032367537,0.036238533,0.0004282825],"about_ca_topic_score_codex":0.00001527872,"about_ca_topic_score_gemma":0.000016074508,"teacher_disagreement_score":0.9417186,"about_ca_system_score_codex":0.00017138229,"about_ca_system_score_gemma":0.000018578474,"threshold_uncertainty_score":0.56693816},"labels":[],"label_agreement":null},{"id":"W2077260410","doi":"10.1109/tdc.2010.5484305","title":"Grid expansion planning considering probabilistic production and congestion costs based on nodal effective load model","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"KEPCO Research Institute; Korea Electric Power Corporation","keywords":"Grid; Probabilistic logic; Computer science; Production (economics); Production planning; NODAL; Artificial intelligence; Mathematics","score_opus":0.006609615789227094,"score_gpt":0.20871918261001648,"score_spread":0.2021095668207894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2077260410","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79119265,0.00004239548,0.20193392,0.000069685666,0.0012847881,0.0011192077,0.0000028293782,0.0007574808,0.0035970474],"genre_scores_gemma":[0.9953502,0.0000021178969,0.0043523908,0.000020793355,0.000098811644,0.00010179793,0.000009456536,0.00003334335,0.000031098378],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991511,0.000030582494,0.0001707669,0.0002731577,0.00018750074,0.00018686477],"domain_scores_gemma":[0.9994872,0.00012687969,0.000034342902,0.00018476679,0.00010139669,0.0000653877],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027208938,0.00016815624,0.00014611302,0.00011506152,0.00007687086,0.00004275913,0.000036889476,0.00011287346,0.0000058212436],"category_scores_gemma":[0.00045789234,0.00016324251,0.000016702748,0.00013815495,0.000026797055,0.00018070315,0.000009279388,0.00025942895,0.0000064214187],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002706848,0.000016858254,0.00048784976,0.00008211171,0.000006574334,0.0000019225956,0.00012716485,0.95828414,0.039181948,0.00013769268,0.00022023445,0.0014264663],"study_design_scores_gemma":[0.00029492308,0.000070536466,0.000993912,0.00014294613,0.000013843385,0.00001959616,0.000010433277,0.9819022,0.016312512,0.000043869666,0.0000127565945,0.00018246808],"about_ca_topic_score_codex":0.000011915826,"about_ca_topic_score_gemma":0.000055759985,"teacher_disagreement_score":0.20415755,"about_ca_system_score_codex":0.00019590395,"about_ca_system_score_gemma":0.000038995982,"threshold_uncertainty_score":0.6656836},"labels":[],"label_agreement":null},{"id":"W2078600216","doi":"10.1109/pes.2010.5589468","title":"Discrete monkey algorithm and its application in transmission network expansion planning","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"Tsinghua University","keywords":"Climb; Jump; Process (computing); Mathematical optimization; Computer science; Algorithm; Representation (politics); Transmission (telecommunications); Population; Optimization problem; Mathematics; Engineering","score_opus":0.0040032846243470655,"score_gpt":0.20782446314069983,"score_spread":0.20382117851635276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078600216","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058367167,0.0006112159,0.93799657,0.000029539187,0.00014458221,0.00026872288,5.5269885e-7,0.00024293682,0.0023386946],"genre_scores_gemma":[0.97737664,0.00006179905,0.022339819,0.000009752521,0.00007494898,0.00003521255,0.0000141657,0.000023040648,0.000064629676],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994353,0.0000112108855,0.00016437245,0.00013728577,0.000081222985,0.00017061169],"domain_scores_gemma":[0.99979997,0.000023941202,0.000015860587,0.000092759146,0.000012029464,0.00005544562],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012266352,0.00009337582,0.000097221906,0.00006420596,0.000033098797,0.000019420131,0.000051689145,0.00010137519,0.000009065689],"category_scores_gemma":[0.0000035844164,0.00008731727,0.000010399999,0.00022603101,0.0000035604776,0.00014710694,0.0000071565305,0.0001654508,0.000005046003],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009394646,0.000015437148,0.00210743,0.000083487525,0.000011226512,0.0000047970366,0.00074627093,0.64868903,0.073963374,0.00077746407,0.00045065314,0.27314144],"study_design_scores_gemma":[0.00018280809,0.000009658528,0.0013731745,0.000031495794,0.00000279503,0.00000564977,0.000009134222,0.99361455,0.0033779405,0.0000824069,0.0011984361,0.00011197113],"about_ca_topic_score_codex":0.0000134577895,"about_ca_topic_score_gemma":0.0000075895928,"teacher_disagreement_score":0.91900945,"about_ca_system_score_codex":0.00001491679,"about_ca_system_score_gemma":0.000004789975,"threshold_uncertainty_score":0.3560695},"labels":[],"label_agreement":null},{"id":"W2078899691","doi":"10.20430/ete.v79i315.70","title":"Optimación de las redes de trasmisión eléctrica en Norteamérica. Teoría y aplicaciones","year":2012,"lang":"es","type":"article","venue":"El Trimestre Económico","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Physics; Political science; Operator splitting; Philosophy; Mathematics","score_opus":0.005509203580979835,"score_gpt":0.24902131538178307,"score_spread":0.24351211180080323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078899691","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7729504,0.03815572,0.07009961,0.001327884,0.0027800407,0.0020692968,0.00017197599,0.0024274234,0.110017665],"genre_scores_gemma":[0.9814522,0.0020193884,0.012138213,0.00009423068,0.0016119201,0.00011362791,0.00005991294,0.00024378081,0.0022666813],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99581385,0.00037702246,0.0009626993,0.0005881098,0.00032793856,0.0019303983],"domain_scores_gemma":[0.99742955,0.0006390005,0.00029447244,0.0008199626,0.00009230091,0.00072470726],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0010166003,0.00075182866,0.00081958115,0.00054994895,0.00021443338,0.000212145,0.0006504078,0.0007354089,0.00023706058],"category_scores_gemma":[0.00038344337,0.0008540831,0.00031856107,0.0010734289,0.00006109324,0.00070774683,0.000088268825,0.00076397695,0.000837416],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044202674,0.0037257588,0.4615621,0.0032741583,0.0041063745,0.00025886213,0.015545609,0.160295,0.059839424,0.023250986,0.17357625,0.09412345],"study_design_scores_gemma":[0.008697977,0.001165394,0.28160486,0.0015962332,0.0025395248,0.002501598,0.0009778893,0.2752657,0.13224168,0.0011566243,0.28450084,0.0077516823],"about_ca_topic_score_codex":0.00013880998,"about_ca_topic_score_gemma":0.000001896908,"teacher_disagreement_score":0.20850186,"about_ca_system_score_codex":0.0011513525,"about_ca_system_score_gemma":0.0005798085,"threshold_uncertainty_score":0.9999406},"labels":[],"label_agreement":null},{"id":"W2079593790","doi":"10.1016/j.tej.2007.10.005","title":"Export Demand Response in the Ontario Electricity Market","year":2007,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity market; Mains electricity; Economics; Supply and demand; Mean reversion; Industrial organization; Business; Electricity retailing; Demand shock; Electricity price; Electricity demand; Monetary economics; Market economy; International economics; Commerce; Microeconomics; Electricity generation; Financial economics; Power (physics); Engineering","score_opus":0.007685336472541902,"score_gpt":0.21026686772912245,"score_spread":0.20258153125658054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2079593790","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83469903,0.0011770858,0.15193875,0.0002947445,0.00031255189,0.00037895684,4.6834023e-7,0.000097919714,0.011100464],"genre_scores_gemma":[0.99842227,0.00014588944,0.00023267638,0.00023805336,0.00022360939,0.00000850749,8.8097823e-7,0.000033164586,0.00069496216],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9970857,0.00061719766,0.0006584924,0.00016020559,0.0006213652,0.00085707515],"domain_scores_gemma":[0.9983632,0.00095164473,0.00014947078,0.00034887076,0.0000893864,0.00009745355],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012552857,0.00024197911,0.0002510619,0.0004364646,0.00033624057,0.00015630298,0.0007235694,0.00013446629,0.000103272665],"category_scores_gemma":[0.00030379865,0.00015265867,0.00010860905,0.0017813434,0.000027016482,0.00021857937,0.000017360564,0.0015639869,0.000016415814],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.023259198,0.0016909337,0.18936001,0.00016799706,0.0016043948,0.0047243903,0.07968129,0.19625627,0.060848802,0.0014230219,0.38258114,0.058402553],"study_design_scores_gemma":[0.0031259481,0.0011734457,0.85911685,0.00010464543,0.00017732165,0.013264238,0.00036527103,0.07522385,0.017533977,0.0022480942,0.026392598,0.0012737558],"about_ca_topic_score_codex":0.00033393243,"about_ca_topic_score_gemma":0.0035180766,"teacher_disagreement_score":0.6697568,"about_ca_system_score_codex":0.0011747058,"about_ca_system_score_gemma":0.00021288334,"threshold_uncertainty_score":0.6794832},"labels":[],"label_agreement":null},{"id":"W2080878608","doi":"10.5547/issn0195-6574-ej-vol29-no4-2","title":"High Frequency Export and Price Responses in the Ontario Electricity Market","year":2008,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Independent Electricity System Operator; University of Toronto","funders":"","keywords":"Electricity; Electricity market; Electricity price; Economics; Shock (circulatory); Supply shock; Monetary economics; Event study; Mains electricity; Supply and demand; Business; Industrial organization; Econometrics; Microeconomics; Monetary policy","score_opus":0.008391294873393688,"score_gpt":0.1780376288446655,"score_spread":0.16964633397127182,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2080878608","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97340167,0.0016851679,0.014388769,0.00021216692,0.00024219145,0.00006010355,4.6934363e-7,0.000042942287,0.009966553],"genre_scores_gemma":[0.9973148,0.0008147781,0.00044812664,0.000097391625,0.00012184464,0.0000076228353,6.255703e-7,0.000014368155,0.0011804249],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99901384,0.00022693955,0.00024203425,0.0000741214,0.0002132552,0.00022981534],"domain_scores_gemma":[0.99955773,0.00015569055,0.00005951721,0.00016058637,0.000028937904,0.000037535316],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007686649,0.000107076,0.00011639772,0.000112213056,0.00019044799,0.000039753508,0.00023276544,0.000049036462,0.000066671004],"category_scores_gemma":[0.000049015656,0.000063955464,0.000026614034,0.00031462437,0.000022973782,0.00013232174,0.0000100676525,0.00036092947,0.0000011408329],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015213096,0.00067062106,0.3541295,0.00010096123,0.0012730688,0.0061270716,0.088839106,0.2658623,0.02056173,0.023933303,0.21561356,0.021367488],"study_design_scores_gemma":[0.0021718787,0.00035961583,0.9135046,0.00011399287,0.00007633194,0.036441244,0.00022823185,0.018263165,0.004009866,0.004430572,0.019495262,0.00090523233],"about_ca_topic_score_codex":0.0017494812,"about_ca_topic_score_gemma":0.0021553582,"teacher_disagreement_score":0.5593751,"about_ca_system_score_codex":0.00020858536,"about_ca_system_score_gemma":0.0000966145,"threshold_uncertainty_score":0.2644704},"labels":[],"label_agreement":null},{"id":"W2081059316","doi":"10.2298/yjor0202157h","title":"A separable approximation dynamic programming algorithm for economic dispatch with transmission losses","year":2002,"lang":"en","type":"article","venue":"Yugoslav journal of operations research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; HEC Montréal","funders":"","keywords":"Lagrange multiplier; Economic dispatch; Mathematical optimization; Separable space; Convergence (economics); Quadratic equation; Quadratic programming; Dynamic programming; Multiplier (economics); Mathematics; Transmission (telecommunications); Stability (learning theory); Iterative method; Computer science; Algorithm; Electric power system","score_opus":0.02603753094713742,"score_gpt":0.30592939787669976,"score_spread":0.27989186692956236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2081059316","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02026873,0.0013600386,0.97687185,0.00023356786,0.00009620444,0.00074920175,0.0000096285685,0.000044758686,0.00036602587],"genre_scores_gemma":[0.69098324,0.00069995044,0.3072808,0.0000029657801,0.00012398089,0.00015483596,0.000022804632,0.000061295315,0.0006701472],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986541,0.00008785616,0.0004410924,0.00013045881,0.00034687138,0.00033960392],"domain_scores_gemma":[0.9991988,0.00010597344,0.000040133207,0.00014573759,0.0003975799,0.00011177682],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008118919,0.00012119804,0.00020038936,0.0004263858,0.00026883357,0.0002530985,0.00019197624,0.0000730751,0.00010110711],"category_scores_gemma":[0.000027117649,0.000099172554,0.00005919501,0.0003310042,0.000035155394,0.00066259195,0.000006711613,0.00028802533,0.000021189393],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016212414,0.000088153145,0.00003544415,0.00009487592,0.000085642016,0.0000069056246,0.00075375405,0.7798139,0.001014143,0.000067880785,0.0011269142,0.21689616],"study_design_scores_gemma":[0.00069101964,0.00038521865,0.000016373438,0.00010111753,0.00001669331,0.00013228146,0.00011942509,0.9935906,0.0014867836,0.000020634729,0.0033257902,0.000114078226],"about_ca_topic_score_codex":0.000014930969,"about_ca_topic_score_gemma":0.000037733666,"teacher_disagreement_score":0.6707145,"about_ca_system_score_codex":0.0003877919,"about_ca_system_score_gemma":0.00009716332,"threshold_uncertainty_score":0.40441394},"labels":[],"label_agreement":null},{"id":"W2081109420","doi":"10.1049/iet-gtd.2012.0729","title":"Stochastic self‐scheduling of generation companies in day‐ahead multi‐auction electricity markets considering uncertainty of units and electricity market prices","year":2013,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Electricity market; Electricity; Electricity retailing; Scheduling (production processes); Electricity generation; Microeconomics; Business; Industrial organization; Computer science; Economics; Electrical engineering; Power (physics); Engineering; Operations management","score_opus":0.015912105210393466,"score_gpt":0.21500652605070594,"score_spread":0.19909442084031248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2081109420","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4582767,0.00071868143,0.5402115,0.000025092448,0.00010800059,0.0005124437,0.00002569516,0.00009733724,0.000024557583],"genre_scores_gemma":[0.9936462,0.00051197683,0.005070878,0.0000057851935,0.00006575359,0.00007165194,0.00058437703,0.000027489043,0.000015867228],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978287,0.00026828077,0.00091671647,0.00033479292,0.00033167948,0.00031982965],"domain_scores_gemma":[0.99887264,0.00012916829,0.00025173745,0.00017770227,0.00046621918,0.00010252705],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000643913,0.00028171527,0.0004080675,0.00028330885,0.000125822,0.000058011894,0.00009359276,0.00022974366,0.000039469283],"category_scores_gemma":[0.00015377105,0.0002988055,0.0000484961,0.0011548764,0.000036515485,0.0005354536,0.000010712313,0.00021630341,0.0000010688905],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025689867,0.000101270714,0.0005530591,0.00020465406,0.000042969372,4.0530716e-7,0.00041278437,0.6462719,0.34519067,0.000072316616,0.00044859748,0.0066757156],"study_design_scores_gemma":[0.0007854915,0.00006682004,0.0070428057,0.00009790305,0.00004052739,0.0000070239594,0.00003856901,0.8720445,0.11957219,0.000017161221,0.000058046295,0.0002289754],"about_ca_topic_score_codex":0.00013977615,"about_ca_topic_score_gemma":0.00006781837,"teacher_disagreement_score":0.5353695,"about_ca_system_score_codex":0.00028144172,"about_ca_system_score_gemma":0.00009823725,"threshold_uncertainty_score":0.9999464},"labels":[],"label_agreement":null},{"id":"W2082259714","doi":"10.1109/lescpe.2006.280358","title":"Security Constraints Unit Commitment for a Multi-Regional Electricity Market","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Electricity market; Power system simulation; Electricity; Operator (biology); Deregulation; Computer science; Mathematical optimization; Electric power system; Electricity retailing; Electricity generation; Operations research; Economics; Power (physics); Engineering; Electrical engineering; Mathematics; Market economy","score_opus":0.0180610211760761,"score_gpt":0.2341594364953559,"score_spread":0.21609841531927979,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2082259714","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007114615,0.00021199923,0.9544876,0.000058667694,0.00016116104,0.0007502081,0.00002736834,0.0005465907,0.036641788],"genre_scores_gemma":[0.9835223,0.000010595518,0.014990999,0.00005634827,0.000064402,0.000094216266,0.00005939,0.0000270366,0.0011747404],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992188,0.000026234326,0.00022157605,0.00013659899,0.0001172524,0.00027951555],"domain_scores_gemma":[0.9996428,0.000087828776,0.000027888991,0.00012591675,0.000070510025,0.000045054563],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016758425,0.00013685328,0.00014327324,0.00008763522,0.000053631335,0.000024734478,0.000094051735,0.00007975061,0.0001649525],"category_scores_gemma":[0.000013673631,0.00013877903,0.000054228487,0.00021565333,0.000023611396,0.00006748449,0.0000071045447,0.000076493074,0.000011860211],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000103506056,0.00086933863,0.012346471,0.0005538212,0.0004173569,0.000014507813,0.00022496974,0.079533495,0.0026774455,0.05251024,0.8440053,0.006743583],"study_design_scores_gemma":[0.0011460116,0.000035024157,0.0018850834,0.000011611947,0.000016001803,0.000015776157,0.000010876753,0.9821407,0.0022115773,0.0003548935,0.011943284,0.00022914191],"about_ca_topic_score_codex":0.00005941394,"about_ca_topic_score_gemma":0.00013720567,"teacher_disagreement_score":0.97640765,"about_ca_system_score_codex":0.000118531265,"about_ca_system_score_gemma":0.00002419914,"threshold_uncertainty_score":0.5659244},"labels":[],"label_agreement":null},{"id":"W2082835804","doi":"10.1007/s11149-011-9169-9","title":"Response of industrial customers to hourly pricing in Ontario’s deregulated electricity market","year":2011,"lang":"en","type":"article","venue":"Journal of Regulatory Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Economics; Order (exchange); Consumption (sociology); Public finance; Electricity market; Electricity pricing; Microeconomics; Demand side; Electricity retailing; Demand response; Econometrics; Industrial organization; Macroeconomics; Finance","score_opus":0.018352310139828618,"score_gpt":0.18124040285932216,"score_spread":0.16288809271949356,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2082835804","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99711794,0.000089212765,0.00082372123,0.0000134564025,0.0005537323,0.00017408347,0.0000016519729,0.000019788054,0.0012064216],"genre_scores_gemma":[0.9982753,0.000013635633,0.001522765,0.000015917678,0.000040247312,0.000001574103,3.715255e-7,0.000034347864,0.00009583284],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.998448,0.000111370675,0.0009718645,0.000112540954,0.000102850594,0.00025334032],"domain_scores_gemma":[0.99907374,0.000083036204,0.00041418688,0.00019978014,0.000094107854,0.00013514124],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015295148,0.00015695661,0.00044723792,0.00087074557,0.000016294054,0.000012895843,0.00023285864,0.00018868654,0.00006793629],"category_scores_gemma":[0.00009189518,0.00017508648,0.00009613742,0.0003527925,0.000016307738,0.00028730292,0.000017604725,0.00033648175,0.0000020667785],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0061679147,0.00015424182,0.15217504,0.000042819753,0.00045881726,0.000050377574,0.0055465964,0.81776845,0.005791209,0.000119426455,0.0052662827,0.006458797],"study_design_scores_gemma":[0.0073285354,0.0017713693,0.79831725,0.0005265916,0.0001751489,0.00048604995,0.0003798752,0.10153976,0.08349932,0.00021694359,0.0044667413,0.001292403],"about_ca_topic_score_codex":0.00051536853,"about_ca_topic_score_gemma":0.0014972688,"teacher_disagreement_score":0.7162287,"about_ca_system_score_codex":0.0015549093,"about_ca_system_score_gemma":0.00037548944,"threshold_uncertainty_score":0.7139819},"labels":[],"label_agreement":null},{"id":"W2083055477","doi":"10.5547/01956574.36.4.kmal","title":"The Impact of Electricity Sector Restructuring on Coal-fired Power Plants in India","year":2015,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kellogg's (Canada)","funders":"","keywords":"Unbundling; Restructuring; Electricity; Electricity generation; Thermal power station; Business; Nameplate capacity; Coal; Industrial organization; Natural resource economics; Power (physics); Environmental economics; Economics; Waste management; Engineering; Finance; Electrical engineering","score_opus":0.009907321700084296,"score_gpt":0.21874027220152734,"score_spread":0.20883295050144304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2083055477","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99323153,0.00076368253,0.0014730556,0.000018394681,0.00043733788,0.000048471615,0.0000020625425,0.000032757318,0.0039926763],"genre_scores_gemma":[0.99965155,0.00014295972,0.000020463056,0.000006813812,0.000109268556,0.0000021054486,9.01614e-7,0.000022414632,0.000043535332],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998973,0.00014893015,0.00028390993,0.00006067665,0.0002515206,0.00028192883],"domain_scores_gemma":[0.9994634,0.00012278133,0.000115153234,0.00018011862,0.000038469938,0.00008009805],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005618331,0.00011888468,0.00014559033,0.0001402359,0.00007846152,0.0000459469,0.00028121518,0.000059447895,0.000007213059],"category_scores_gemma":[0.00007802972,0.00006411303,0.000056791716,0.00026151937,0.000015808504,0.00007781251,0.000013610021,0.0003081026,0.0000018549229],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015321201,0.000015706299,0.0021992405,0.0000019328334,0.00010860143,0.00002026609,0.0007264644,0.9900512,0.0019709372,0.00028143547,0.003333849,0.0011371584],"study_design_scores_gemma":[0.006415767,0.0019186141,0.40580237,0.00044773694,0.000047900267,0.0029351246,0.00048408046,0.46426022,0.107844345,0.0072378838,0.0014186961,0.0011872519],"about_ca_topic_score_codex":0.00009324823,"about_ca_topic_score_gemma":0.000019616255,"teacher_disagreement_score":0.525791,"about_ca_system_score_codex":0.00035890748,"about_ca_system_score_gemma":0.000096068485,"threshold_uncertainty_score":0.26144534},"labels":[],"label_agreement":null},{"id":"W2083593405","doi":"10.1016/j.enpol.2009.10.032","title":"Long-term uncertainty evaluation of pool electricity markets","year":2009,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Term (time); Electricity; Economics; Natural resource economics; Electricity market; Business; Environmental economics; Engineering; Physics","score_opus":0.009904219640855918,"score_gpt":0.2551104251714278,"score_spread":0.24520620553057187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2083593405","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80072767,0.0022860374,0.10980665,0.0002690352,0.00037019415,0.00038336488,0.00000876473,0.00063952303,0.08550877],"genre_scores_gemma":[0.99928397,0.00010884713,0.000088330584,0.00007339901,0.00019328053,0.0000127675285,0.000027007893,0.000018078132,0.00019431762],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988786,0.00010578025,0.00026050568,0.00013040524,0.00036565377,0.00025908247],"domain_scores_gemma":[0.99946576,0.000029655037,0.00006416338,0.00024054784,0.00014108843,0.000058761212],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034981754,0.00013254266,0.00016524017,0.0003093723,0.000026458076,0.000013105656,0.00013205034,0.00009206757,0.00004715573],"category_scores_gemma":[0.00012187692,0.00014018155,0.00005033517,0.00076417724,0.000008468176,0.000103387094,0.0000064251644,0.00006205365,0.0000047848816],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001910304,0.00005758472,0.00041420464,0.00002569988,0.00006493108,0.0000016653329,0.00012529804,0.7742144,0.0070105554,0.0066238665,0.0016107943,0.20983188],"study_design_scores_gemma":[0.00084000785,0.00009555073,0.07145021,0.000042215084,0.000065375716,0.00001574882,0.0000020098187,0.8884429,0.03737032,0.0011197748,0.0002557835,0.00030013677],"about_ca_topic_score_codex":0.00014942285,"about_ca_topic_score_gemma":0.00003071087,"teacher_disagreement_score":0.20953175,"about_ca_system_score_codex":0.0003884251,"about_ca_system_score_gemma":0.00011932339,"threshold_uncertainty_score":0.57164377},"labels":[],"label_agreement":null},{"id":"W2084187431","doi":"10.1016/j.enpol.2011.01.033","title":"Ontario feed-in-tariff programs","year":2011,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":106,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"Government of Ontario","keywords":"Tariff; Photovoltaic system; Feed-in tariff; Electricity; Legislation; Wind power; Sustainability; Mains electricity; Business; Engineering; Environmental economics; Operations management; Renewable energy; Economics; Political science; Energy policy; Electrical engineering","score_opus":0.013491096838216027,"score_gpt":0.17685306958703353,"score_spread":0.1633619727488175,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2084187431","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07369931,0.00025766864,0.021626683,0.000038441907,0.0005409107,0.00014716355,7.4352926e-7,0.00074436277,0.90294474],"genre_scores_gemma":[0.9936591,0.000013103857,0.0014026547,0.00004507359,0.00011331723,0.000039040337,0.0000083323885,0.000030754123,0.0046886303],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99931085,0.000013899467,0.00017156862,0.00011570244,0.00008178847,0.0003061771],"domain_scores_gemma":[0.9997075,0.0000048863258,0.000018710381,0.00019097042,0.000012975234,0.000064918226],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004755293,0.00011698535,0.00011845648,0.00022056789,0.000016306194,0.000014490928,0.0001271091,0.00008451455,0.000080152735],"category_scores_gemma":[0.000006355609,0.00012394214,0.000030785475,0.00041145965,0.000009318361,0.00009936029,0.000013726928,0.0000892611,0.000040913335],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006565325,0.00072459585,0.097241685,0.00016628121,0.00039128796,0.00019675045,0.04445835,0.08135705,0.001161308,0.48395783,0.009216495,0.28106272],"study_design_scores_gemma":[0.004088316,0.0006603416,0.12909773,0.00033299762,0.000066607536,0.00020105133,0.00016444775,0.11133612,0.025702404,0.009854744,0.71519256,0.0033027006],"about_ca_topic_score_codex":0.1603373,"about_ca_topic_score_gemma":0.13336666,"teacher_disagreement_score":0.9199598,"about_ca_system_score_codex":0.00038555675,"about_ca_system_score_gemma":0.00007937065,"threshold_uncertainty_score":0.8824471},"labels":[],"label_agreement":null},{"id":"W2085116453","doi":"10.1007/s10287-014-0222-x","title":"The natural hedge of a gas-fired power plant","year":2014,"lang":"en","type":"article","venue":"Computational Management Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Lawrence Berkeley National Laboratory; HEC Montréal","keywords":"Hedge; Natural gas prices; Spot contract; Natural gas; Electricity; Economics; Electricity generation; Stochastic programming; Volatility (finance); Electricity price; Microeconomics; Econometrics; Futures contract; Business; Financial economics; Power (physics); Engineering; Waste management; Mathematics","score_opus":0.0033074452193659967,"score_gpt":0.18609909155247228,"score_spread":0.1827916463331063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2085116453","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051913403,0.0003262778,0.8888871,0.00028092033,0.0017873439,0.00042433012,0.000003011742,0.00023633355,0.056141295],"genre_scores_gemma":[0.9952259,0.0000064952537,0.0046314034,0.000028850403,0.0000110154315,0.000007187832,0.0000036980618,0.000005180057,0.000080283666],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99915445,0.000014399439,0.00015771811,0.00012140462,0.00038935733,0.0001626579],"domain_scores_gemma":[0.9996444,0.00009843848,0.000038692197,0.00013420051,0.000057330555,0.00002691849],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004486651,0.00006175107,0.00005834695,0.00010869998,0.00014761,0.000055182118,0.00034058522,0.000008286484,0.000002816583],"category_scores_gemma":[0.000029543153,0.00004754059,0.000017482342,0.00056145573,0.000108105916,0.00013098799,0.000051450435,0.00003617379,0.00001577783],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000032953806,0.000008748449,0.00013759265,0.000030202977,0.00001594056,7.239881e-7,0.00009966659,0.8163668,0.00015139165,0.17586614,0.0016646697,0.0056548403],"study_design_scores_gemma":[0.000115205745,0.000013215026,0.009484699,0.00001612747,0.0000031126883,0.0000023844555,0.000016819307,0.9862289,0.000103403014,0.0022454357,0.0017076366,0.00006305537],"about_ca_topic_score_codex":8.4702776e-7,"about_ca_topic_score_gemma":6.4749315e-7,"teacher_disagreement_score":0.94331247,"about_ca_system_score_codex":0.00005105082,"about_ca_system_score_gemma":0.000010569884,"threshold_uncertainty_score":0.1938649},"labels":[],"label_agreement":null},{"id":"W2087603572","doi":"10.1016/s0301-4215(99)00087-7","title":"A perspective on the restructuring of the Finnish electricity market","year":2000,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Restructuring; Deregulation; Electricity market; Electricity; Market economy; Perspective (graphical); Dimension (graph theory); Originality; Electricity retailing; Electric power industry; Business; Economics; Industrial organization; Economic system; Economy; Political science; Engineering; Finance","score_opus":0.003172314034370209,"score_gpt":0.1863178166390369,"score_spread":0.1831455026046667,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2087603572","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27259627,0.00029786592,0.0005082342,0.001492718,0.00015559894,0.000150432,0.0000072409166,0.00019101432,0.7246006],"genre_scores_gemma":[0.99523836,0.000085885724,0.000028714001,0.00020148038,0.00017454401,0.000012805321,3.7522358e-7,0.000022466156,0.0042353794],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993274,0.000084751,0.00013433435,0.00010169429,0.00015042012,0.00020137781],"domain_scores_gemma":[0.99950266,0.000089422145,0.00003074247,0.00032882273,0.000025847628,0.000022498505],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000810919,0.00010471863,0.00009630343,0.00007856879,0.00007704144,0.000014748489,0.0002535526,0.000050842507,0.00019386304],"category_scores_gemma":[0.00008864037,0.00006549675,0.00005768326,0.0007149407,0.00002584039,0.000035723104,0.000012355536,0.00011967799,0.0000042681672],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060701615,0.00004553609,0.00015106979,0.000027541555,0.00021465286,0.0000030015497,0.0023901495,0.5653014,0.0023328862,0.36539128,0.04412949,0.019952238],"study_design_scores_gemma":[0.0017708036,0.00034435323,0.079092465,0.0003380595,0.00010123526,0.00012953831,0.00030541103,0.47517177,0.29467148,0.034842394,0.11170157,0.0015309297],"about_ca_topic_score_codex":0.0013438746,"about_ca_topic_score_gemma":0.000050013005,"teacher_disagreement_score":0.72264206,"about_ca_system_score_codex":0.00026940973,"about_ca_system_score_gemma":0.000044296707,"threshold_uncertainty_score":0.267088},"labels":[],"label_agreement":null},{"id":"W2087767050","doi":"10.1109/ptc.2009.5282254","title":"A framework for the simultaneous clearing of multiple markets within a common transmission system","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Clearing; Nash equilibrium; Interconnection; Market clearing; Computer science; Mathematical optimization; Transmission (telecommunications); Pareto optimal; Pareto principle; Set (abstract data type); Transmission line; Economics; Telecommunications; Mathematics; Microeconomics","score_opus":0.008048158282935378,"score_gpt":0.21967268361386022,"score_spread":0.21162452533092485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2087767050","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008896675,0.0004307203,0.98807067,0.000048332982,0.0001613181,0.0006021723,0.0000021062224,0.0003869293,0.001401106],"genre_scores_gemma":[0.9542018,0.000013202103,0.04563702,0.000016783019,0.000027627611,0.000015604282,0.0000018531342,0.000023577637,0.0000625343],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926865,0.000025728797,0.0003061202,0.000103941544,0.00012702927,0.00016852432],"domain_scores_gemma":[0.99868804,0.0009623402,0.00005006523,0.0002183772,0.000043070933,0.00003812358],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023167818,0.000112974565,0.00018249737,0.000046641693,0.00005499816,0.000021776828,0.00015378234,0.00010768552,0.0000049457685],"category_scores_gemma":[0.00008249597,0.0000798178,0.000059676422,0.00019758807,0.0000065927043,0.000049868715,0.0000041336266,0.00011431347,0.0000017718402],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009054493,0.000018627288,0.000055097695,0.0002975226,0.000038720475,0.0000023617054,0.0007698759,0.95286006,0.0018228462,0.0025388296,0.00010989556,0.04139563],"study_design_scores_gemma":[0.00025709372,0.00006014129,0.000099995166,0.0002497548,0.00002142508,0.000010022458,0.00011109319,0.99277365,0.005988866,0.00009216869,0.00023945462,0.000096320015],"about_ca_topic_score_codex":0.000013809113,"about_ca_topic_score_gemma":0.0000045107995,"teacher_disagreement_score":0.9453051,"about_ca_system_score_codex":0.000059704882,"about_ca_system_score_gemma":0.0000075453863,"threshold_uncertainty_score":0.32548755},"labels":[],"label_agreement":null},{"id":"W2087848664","doi":"10.1109/tpwrs.2011.2180935","title":"Time-of-Use Pricing in Electricity Markets Under Different Market Structures","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":165,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity market; Electricity pricing; Electricity; Economics; Context (archaeology); Microeconomics; Variable pricing; Welfare; Scheme (mathematics); Market power; Econometrics; Industrial organization; Monopoly; Engineering; Market economy; Mathematics","score_opus":0.00840577856234772,"score_gpt":0.20087651612512983,"score_spread":0.1924707375627821,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2087848664","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25976545,0.0004503366,0.73495436,0.0000048245306,0.0021992808,0.000541745,0.000020446816,0.00024203862,0.0018215303],"genre_scores_gemma":[0.9989923,0.00004689438,0.000103313905,0.000010070186,0.000018091025,0.000057168152,0.0000025708123,0.00007094634,0.0006986084],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981107,0.00021381996,0.00059192505,0.0002091671,0.0003394993,0.00053485687],"domain_scores_gemma":[0.9990934,0.00026734275,0.00009535654,0.0003694977,0.00004959497,0.00012481186],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00031520653,0.00030190052,0.0004286109,0.0005596533,0.000053248474,0.000043276712,0.00015477958,0.00020101898,0.00015273948],"category_scores_gemma":[0.000008133453,0.0002848866,0.00009900574,0.0006545762,0.0000210763,0.00038395,9.959645e-7,0.0003116486,0.000022445898],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001709321,0.00044275916,0.002248407,0.00050667924,0.00041278385,0.000005745232,0.0017438235,0.9779093,0.0130641395,0.00016361919,0.0028089618,0.0005228038],"study_design_scores_gemma":[0.002657811,0.0003170099,0.0638404,0.00087416556,0.00021736708,0.00021095267,0.0004140997,0.8537775,0.07470097,0.000026523152,0.0010266657,0.0019364934],"about_ca_topic_score_codex":0.000059546535,"about_ca_topic_score_gemma":0.00001043288,"teacher_disagreement_score":0.7392269,"about_ca_system_score_codex":0.00040947218,"about_ca_system_score_gemma":0.000018575362,"threshold_uncertainty_score":0.9999603},"labels":[],"label_agreement":null},{"id":"W2089254196","doi":"10.1016/j.enpol.2004.12.019","title":"Electricity markets volatility: estimates, regularities and risk management applications","year":2005,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Electricity; Volatility (finance); Futures contract; Electricity market; Deregulation; Electric power; Electric power industry; Economics; Business; Industrial organization; Risk management; Financial economics; Finance; Power (physics); Market economy; Engineering","score_opus":0.0026598840609641755,"score_gpt":0.1905034763286211,"score_spread":0.18784359226765693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2089254196","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007345983,0.006477533,0.83017224,0.00029095815,0.00005829165,0.00033183,0.000021144831,0.0011073803,0.15419465],"genre_scores_gemma":[0.9750413,0.0034186353,0.01743906,0.00008646432,0.00032204358,0.0002195281,0.000025457133,0.000046686837,0.0034008387],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999275,0.000026162334,0.00018119498,0.00016359017,0.00010459017,0.00024945708],"domain_scores_gemma":[0.99959224,0.00003657525,0.000032974458,0.0002486189,0.000019656116,0.00006995769],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000099540375,0.00013435341,0.000119984,0.00023133401,0.00009239946,0.00003789963,0.00009721201,0.00006195306,0.000012625452],"category_scores_gemma":[0.000011727993,0.00015038914,0.00002265532,0.0004382239,0.000019433324,0.00011865603,0.000027994885,0.00006953322,0.0000066759303],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011259715,0.000061502826,0.0016876974,0.00019358983,0.00030829958,0.000002361114,0.00023535994,0.05346515,0.00010662614,0.19041698,0.005681417,0.7478298],"study_design_scores_gemma":[0.00026439718,0.000010836178,0.0035818499,0.000012756209,0.00004744822,0.000014095899,0.000005815736,0.74055177,0.0012541687,0.0034148796,0.25059146,0.00025051084],"about_ca_topic_score_codex":0.0004418816,"about_ca_topic_score_gemma":0.00009018351,"teacher_disagreement_score":0.9676953,"about_ca_system_score_codex":0.00016623396,"about_ca_system_score_gemma":0.000012341868,"threshold_uncertainty_score":0.6132691},"labels":[],"label_agreement":null},{"id":"W2091989020","doi":"10.1016/s0378-7796(02)00217-1","title":"Algorithms for incorporating reactive power into market dispatch","year":2003,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"AC power; Economic dispatch; Mathematical optimization; Convexity; Power flow; Computer science; Power (physics); Electricity market; Electric power system; Electricity; Engineering; Economics; Mathematics; Electrical engineering; Finance","score_opus":0.025406296818354844,"score_gpt":0.3034344911996591,"score_spread":0.27802819438130427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2091989020","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017283546,0.011891768,0.77698034,0.00009482093,0.0036038137,0.005964682,0.00002863895,0.0011307258,0.1830217],"genre_scores_gemma":[0.9923346,0.000061574035,0.0026124872,0.000008908796,0.00010837175,0.0011500608,0.000017481783,0.00019601014,0.0035105231],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99481237,0.0008975279,0.00081550685,0.0007011797,0.0012427722,0.0015306557],"domain_scores_gemma":[0.996746,0.0011070392,0.00013799185,0.00075626944,0.000936146,0.00031655736],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0054274783,0.00041851055,0.0005769831,0.001043068,0.0004319158,0.00031195674,0.0005249732,0.00036157682,0.000074872514],"category_scores_gemma":[0.0013927495,0.0004219093,0.00013264513,0.0031131238,0.000051785377,0.00043803442,0.000045775334,0.00085475866,0.00012221799],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006365186,0.0011366197,0.0055498234,0.0037739691,0.002644039,0.00033631135,0.00948679,0.032493234,0.10968901,0.059926532,0.76337016,0.010957011],"study_design_scores_gemma":[0.003554263,0.002095761,0.0005132117,0.00057701353,0.000058660367,0.0003891448,0.001847873,0.7804439,0.028522845,0.0027074888,0.17672132,0.0025685022],"about_ca_topic_score_codex":0.00016059079,"about_ca_topic_score_gemma":0.000012168718,"teacher_disagreement_score":0.97505105,"about_ca_system_score_codex":0.0013826434,"about_ca_system_score_gemma":0.00035151333,"threshold_uncertainty_score":0.9998233},"labels":[],"label_agreement":null},{"id":"W2093744828","doi":"10.1109/eem.2010.5558726","title":"Setting greenhouse gas emission target for a generation mix expansion model","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"","keywords":"Greenhouse gas; Lagrange multiplier; Time horizon; Upper and lower bounds; Electricity generation; Zero emission; Constraint (computer-aided design); Zero lower bound; Electricity; Wind power; Mathematical optimization; Economics; Environmental science; Power (physics); Mathematics; Engineering; Physics; Electrical engineering; Monetary economics","score_opus":0.009792508469644527,"score_gpt":0.21565644546955956,"score_spread":0.20586393699991504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2093744828","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17209293,0.000026443733,0.82541025,0.00006127942,0.00039281315,0.000316175,0.0000039018537,0.0005130335,0.0011831649],"genre_scores_gemma":[0.7589287,0.000008065822,0.23997615,0.00002612189,0.0001999759,0.000058126927,0.000049525283,0.00004974646,0.0007035616],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992905,0.0000088044535,0.00021457137,0.00016282825,0.00011502252,0.00020822385],"domain_scores_gemma":[0.99961364,0.00002837783,0.00002988659,0.00019115092,0.000069747504,0.00006716826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018755063,0.00012228778,0.00010246393,0.00008167683,0.00008384953,0.000036948983,0.00007636006,0.00012966857,0.000026652719],"category_scores_gemma":[0.000067377594,0.00011520908,0.00003917698,0.000107158165,0.000003730443,0.00020121464,0.000010175443,0.0001118121,0.000008105876],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026824246,0.000008603244,0.000024609806,0.000027573273,0.000004670304,2.0548445e-7,0.00011161388,0.43343773,0.54956055,0.00012052433,0.013223329,0.0034779115],"study_design_scores_gemma":[0.00022053189,0.000019266696,0.0000022512995,0.0000069152084,0.0000051769816,0.0000034093973,0.000004516216,0.8320459,0.16695134,0.00014459512,0.00047384595,0.00012223724],"about_ca_topic_score_codex":0.0000063271004,"about_ca_topic_score_gemma":0.000027201566,"teacher_disagreement_score":0.5868358,"about_ca_system_score_codex":0.000035078683,"about_ca_system_score_gemma":0.000023448678,"threshold_uncertainty_score":0.469809},"labels":[],"label_agreement":null},{"id":"W2094423654","doi":"10.1016/j.eneco.2010.08.004","title":"Investment in electricity markets with asymmetric technologies","year":2010,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Electricity; Investment (military); Economics; Natural resource economics; Industrial organization; Electricity market; Microeconomics; Business; Environmental economics; Engineering","score_opus":0.0022163837019978983,"score_gpt":0.1444585539531764,"score_spread":0.1422421702511785,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2094423654","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90485734,0.00046959604,0.019376544,0.0000766534,0.0004784931,0.00013516867,0.0000022646016,0.0008961019,0.073707856],"genre_scores_gemma":[0.9937106,0.000275898,0.0057864734,0.000031761367,0.000020807625,0.0000431285,0.0000058613828,0.000030316101,0.000095158466],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994008,0.000007890417,0.0001789123,0.00015374174,0.000030289508,0.00022836373],"domain_scores_gemma":[0.99965775,0.000035747173,0.000036036636,0.00023186771,0.000011464017,0.00002711167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010332432,0.00012328608,0.00014459036,0.0004532845,0.000017460841,0.00002588133,0.00015572362,0.00013010991,0.0000060456164],"category_scores_gemma":[0.000026313674,0.00012358515,0.000015542033,0.00053726934,0.000016446947,0.0001217836,0.0000169591,0.00017699847,0.0000037196535],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008485399,0.0002482682,0.11425958,0.000093156654,0.00031309508,0.00004433088,0.00017264647,0.5024151,0.0032336584,0.1531954,0.0023427343,0.22359714],"study_design_scores_gemma":[0.00070255477,0.00007165065,0.0034002122,0.000010805296,0.0000087529315,0.00003101,0.000025519717,0.91709435,0.052723892,0.0017287721,0.023693258,0.00050924846],"about_ca_topic_score_codex":0.00003769231,"about_ca_topic_score_gemma":0.0007614195,"teacher_disagreement_score":0.41467917,"about_ca_system_score_codex":0.00016779805,"about_ca_system_score_gemma":0.0000245118,"threshold_uncertainty_score":0.5039656},"labels":[],"label_agreement":null},{"id":"W2096598624","doi":"10.1109/ccece.1995.528103","title":"Economic implications to electric power utilities of wind energy produced by nonutility generation","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Computer science; Operating cost; Energy (signal processing); Electric energy; Electric utility; Electricity generation; Reliability engineering; Operations research; Mathematical optimization; Power (physics); Environmental economics; Engineering; Economics; Electrical engineering; Mathematics","score_opus":0.01037573775773561,"score_gpt":0.18738770911138172,"score_spread":0.1770119713536461,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096598624","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8059036,0.0013610336,0.15877295,0.0005048636,0.00033413243,0.0005441457,0.0000359795,0.00049692235,0.03204635],"genre_scores_gemma":[0.9983398,0.00005432533,0.0004203163,0.00004321011,0.00004010029,0.00003654266,0.0000191454,0.000022640874,0.0010239751],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99919367,0.000022025528,0.00031707564,0.00020354117,0.000066999004,0.00019668567],"domain_scores_gemma":[0.9994968,0.000020889618,0.00003487674,0.00033549897,0.000051622595,0.000060313556],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000077911645,0.000117831354,0.00014771703,0.00013613151,0.00003500032,0.00002010291,0.00011184202,0.000061433384,0.0003722825],"category_scores_gemma":[0.000015931626,0.00012860358,0.000032264525,0.0002736426,0.0000063300718,0.0001408653,0.000008629329,0.000037270154,0.000043292268],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000050798667,0.000111333946,0.0014658602,0.000038597973,0.00010018966,1.245847e-7,0.0004456783,0.1411886,0.6114763,0.005028151,0.23451142,0.0056286273],"study_design_scores_gemma":[0.00017622343,0.000085725915,0.0012342334,0.000004139958,0.000012512879,0.0000033835643,0.0000100809775,0.5238081,0.46597534,0.000035721474,0.008384135,0.00027035247],"about_ca_topic_score_codex":0.000060131868,"about_ca_topic_score_gemma":0.000037342965,"teacher_disagreement_score":0.38261953,"about_ca_system_score_codex":0.00018626908,"about_ca_system_score_gemma":0.000013211907,"threshold_uncertainty_score":0.52443016},"labels":[],"label_agreement":null},{"id":"W2097192841","doi":"10.1109/tpwrs.2003.818689","title":"Transmission network cost allocation based on equivalent bilateral exchanges","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":175,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Fraction (chemistry); Transmission (telecommunications); Generator (circuit theory); Computer science; Transmission network; Independence (probability theory); Mathematical optimization; Power flow; Economic dispatch; Power (physics); Electric power system; Telecommunications; Mathematics; Statistics","score_opus":0.013044449559547238,"score_gpt":0.213739998805969,"score_spread":0.20069554924642177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097192841","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00069883856,0.00037506846,0.98473465,0.00005484501,0.005239346,0.0010714054,0.000016345874,0.00066978455,0.007139722],"genre_scores_gemma":[0.99821025,0.00007455896,0.00047634885,0.000069627524,0.00003362758,0.00034022052,0.0000108670365,0.00010405015,0.0006804767],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99796736,0.00023394446,0.0004876171,0.0003604963,0.0004396131,0.0005109914],"domain_scores_gemma":[0.9990964,0.00011470951,0.00006835169,0.00046756727,0.000075403914,0.00017757148],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000403838,0.000353295,0.0003140594,0.00030027112,0.00018182235,0.000092975235,0.00014813575,0.00022897078,0.00015869227],"category_scores_gemma":[0.0000028795737,0.00034414852,0.00013011495,0.0006192061,0.000016908949,0.00016346126,2.0170987e-7,0.00027960478,0.00014083691],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003318011,0.00009309301,0.000006662817,0.000108050066,0.000045340505,0.000004657657,0.00016411163,0.9962193,0.00080693845,0.000097265925,0.0015203361,0.0009010877],"study_design_scores_gemma":[0.0011391251,0.0003888668,0.000023560491,0.0005977142,0.000058807986,0.00002882692,0.000055293283,0.94979817,0.014953776,0.000007479331,0.03234963,0.0005987432],"about_ca_topic_score_codex":0.000018616576,"about_ca_topic_score_gemma":0.000007477826,"teacher_disagreement_score":0.9975114,"about_ca_system_score_codex":0.00037257007,"about_ca_system_score_gemma":0.00004404648,"threshold_uncertainty_score":0.99990106},"labels":[],"label_agreement":null},{"id":"W2097712071","doi":"10.1109/pes.2007.385757","title":"Formulation of Oligopolistic Competition in AC Power Networks: An NLP Approach","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Oligopoly; Node (physics); Competition (biology); Computer science; Set (abstract data type); Operator (biology); Market power; Mathematical optimization; Electric power system; Power (physics); Transmission (telecommunications); Power flow; Nonlinear system; AC power; Artificial intelligence; Operations research; Voltage; Mathematical economics; Engineering; Economics; Microeconomics; Cournot competition; Mathematics; Telecommunications; Electrical engineering","score_opus":0.006337617919972499,"score_gpt":0.20996979855671363,"score_spread":0.20363218063674113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097712071","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36501488,0.00029270363,0.63224083,0.0000023636107,0.0006828622,0.00019969245,0.0000025817435,0.00031172181,0.0012523665],"genre_scores_gemma":[0.95377254,0.000027544835,0.04580012,0.000017096625,0.00021820508,0.00001532877,0.000043247703,0.00009327847,0.000012633657],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99815625,0.00002937554,0.0006666505,0.0002664032,0.00027772776,0.00060358323],"domain_scores_gemma":[0.99935335,0.00009411746,0.0001008087,0.0002581739,0.00008431373,0.00010926363],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010743217,0.0002839908,0.00032724647,0.00017050089,0.00004633656,0.000033706834,0.00017565352,0.00024539046,0.00000552977],"category_scores_gemma":[0.000037792408,0.0003390756,0.00013215735,0.0007320273,0.000014872217,0.00032323165,0.000016903788,0.0002938499,0.0000014637577],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000043086193,0.00003315865,0.0006175616,0.00010361429,0.000033088294,0.0000012287624,0.0010247555,0.96994734,0.027254902,0.0008219872,0.00007131674,0.0000867415],"study_design_scores_gemma":[0.00035283272,0.000037794267,0.0025900023,0.00011195699,0.000012727475,0.000008269624,0.00012403911,0.990261,0.0060950755,0.000010330052,0.00006167812,0.0003342687],"about_ca_topic_score_codex":0.00003677444,"about_ca_topic_score_gemma":0.000007945861,"teacher_disagreement_score":0.5887577,"about_ca_system_score_codex":0.00032708404,"about_ca_system_score_gemma":0.000014018916,"threshold_uncertainty_score":0.9999061},"labels":[],"label_agreement":null},{"id":"W2098397733","doi":"10.1109/tpwrs.2005.846203","title":"Deregulated Power Prices: Changes Over Time","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"University of Alberta","keywords":"Volatility (finance); Economics; Deregulation; Excursion; Price level; Mid price; Monetary economics; Econometrics; Financial economics; Macroeconomics","score_opus":0.005151329615617712,"score_gpt":0.1879213485478605,"score_spread":0.1827700189322428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2098397733","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010729138,0.0008805091,0.96868986,0.00009733115,0.0032704843,0.00078755966,0.00005280879,0.0017684808,0.013723846],"genre_scores_gemma":[0.9947519,0.00003945877,0.00025372594,0.00006482244,0.00003731667,0.00011935123,0.0000073120414,0.00012223738,0.004603924],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99827033,0.00006183599,0.00043799938,0.00033836998,0.0004000723,0.0004914118],"domain_scores_gemma":[0.999093,0.00006974895,0.00007796504,0.00051765697,0.000084655934,0.00015696019],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00019440969,0.00035494805,0.00035962413,0.00040121764,0.000120645804,0.000112130656,0.00022268199,0.00026439445,0.000675656],"category_scores_gemma":[0.0000022362406,0.0003588057,0.00010601784,0.00063343666,0.000022355534,0.00031872734,7.879036e-7,0.00025683007,0.0012936846],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028078004,0.00015348344,0.000005833953,0.00010885362,0.00033945809,0.000008998623,0.0011879231,0.9773086,0.009865481,0.000066482775,0.010260924,0.0006659057],"study_design_scores_gemma":[0.0018336591,0.0004137849,0.00014362817,0.00050892646,0.0001435703,0.000206673,0.00012985404,0.8416685,0.036357515,0.0000034513505,0.11703739,0.00155304],"about_ca_topic_score_codex":0.0000226485,"about_ca_topic_score_gemma":0.000024823916,"teacher_disagreement_score":0.98402274,"about_ca_system_score_codex":0.00036368397,"about_ca_system_score_gemma":0.000025845087,"threshold_uncertainty_score":0.9998864},"labels":[],"label_agreement":null},{"id":"W2098566315","doi":"10.1109/ccece.2005.1557426","title":"An artificial neural network based transmission loss allocation for bilateral contracts","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Computer science; Artificial neural network; Convergence (economics); Deregulation; Electricity market; Volatility (finance); Electricity; Transmission (telecommunications); Process (computing); Telecommunications; Artificial intelligence; Economics; Econometrics; Engineering","score_opus":0.006653960353564527,"score_gpt":0.2082418685856077,"score_spread":0.20158790823204317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2098566315","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.065585755,0.000074938,0.93240976,0.000110265864,0.00032059013,0.00041673976,0.000002459025,0.00048274698,0.0005967347],"genre_scores_gemma":[0.98811996,0.0000010596481,0.0111494055,0.00005229574,0.0003752821,0.000038309212,0.0001696848,0.000034013574,0.00006000631],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999225,0.00002399821,0.0002543377,0.00013835166,0.000093847586,0.00026444736],"domain_scores_gemma":[0.99971324,0.00004131078,0.0000249064,0.00012008353,0.000048581307,0.000051900246],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001339191,0.00011608919,0.000113927585,0.000049489056,0.000060460217,0.00005555601,0.00006732592,0.00008839235,0.000026816813],"category_scores_gemma":[0.0000028188365,0.00010993759,0.000039501538,0.0001617848,0.000006163493,0.00020092775,8.387759e-7,0.000047739013,0.000004091978],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002696918,0.000024277271,0.00013017267,0.000018091298,0.0000036253327,9.1086946e-7,0.000012234328,0.9764966,0.01675511,0.0005169921,0.0010798537,0.0049351854],"study_design_scores_gemma":[0.00031853127,0.000058630503,0.00062079437,0.000009648506,0.000010860964,0.0000018566408,0.0000011465112,0.9790542,0.018406618,0.00022857513,0.0011475402,0.00014158855],"about_ca_topic_score_codex":0.00003318038,"about_ca_topic_score_gemma":0.000046694593,"teacher_disagreement_score":0.92253417,"about_ca_system_score_codex":0.00004506318,"about_ca_system_score_gemma":0.000014223557,"threshold_uncertainty_score":0.44831246},"labels":[],"label_agreement":null},{"id":"W2098970646","doi":"10.3386/w17086","title":"Intermittency and the Value of Renewable Energy","year":2011,"lang":"en","type":"report","venue":"National Bureau of Economic Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":179,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"Arizona Research Institute for Solar Energy","keywords":"Intermittency; Renewable energy; Value (mathematics); Economics; Environmental science; Physics; Mathematics; Statistics; Meteorology; Engineering; Electrical engineering","score_opus":0.15097251989058552,"score_gpt":0.4041374440730765,"score_spread":0.253164924182491,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2098970646","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00013977576,0.004540103,0.0006097945,0.000040781208,0.00045285496,0.00031691144,0.000023501261,0.000018884924,0.9938574],"genre_scores_gemma":[0.9762636,0.009533686,0.00025784934,0.0000036256586,0.00032978028,0.00015166891,0.000105068386,0.000060415143,0.013294325],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9981886,0.00014015868,0.0006271388,0.00019665502,0.00064869045,0.00019874002],"domain_scores_gemma":[0.99801,0.00066454883,0.00018523459,0.00025310967,0.0008483737,0.00003875091],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035753082,0.00013115822,0.00040882206,0.0005290224,0.000035824156,0.00001730217,0.00035728002,0.0002322904,0.00014511166],"category_scores_gemma":[0.0004455776,0.000107978805,0.000085046566,0.0001397365,0.00020958844,0.00008339194,0.000089231624,0.0002615719,0.000006628917],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012271854,0.000049181086,0.00034190255,0.0012407843,0.0010146608,0.0000023497535,0.00033952756,0.09180167,0.00015036944,0.62285835,0.27829248,0.0037860028],"study_design_scores_gemma":[0.0031108179,0.0002638063,0.00052508136,0.0010705177,0.00011486256,0.00016847992,0.00008230479,0.29177395,0.006248099,0.61587596,0.079945624,0.0008204808],"about_ca_topic_score_codex":0.0075220116,"about_ca_topic_score_gemma":0.00022223045,"teacher_disagreement_score":0.98056304,"about_ca_system_score_codex":0.000553518,"about_ca_system_score_gemma":0.00094571745,"threshold_uncertainty_score":0.999087},"labels":[],"label_agreement":null},{"id":"W2099012137","doi":"10.1109/tpwrs.2004.835650","title":"Pay-as-Bid versus Marginal Pricing–Part II: Market Behavior Under Strategic Generator Offers","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":51,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Payment; Marginal cost; Generator (circuit theory); Economics; Microeconomics; Electricity market; Marginal utility; Yield (engineering); Electricity; Econometrics; Power (physics); Finance; Engineering","score_opus":0.017262599924604362,"score_gpt":0.22379331815591813,"score_spread":0.20653071823131378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099012137","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14600112,0.00035777577,0.80888474,0.00008567669,0.021602917,0.0014008825,0.00009584536,0.0013244478,0.020246604],"genre_scores_gemma":[0.99675816,0.000066265085,0.00018429627,0.000030268779,0.00007467595,0.00034348769,0.000010415193,0.00013499391,0.0023974387],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99770045,0.00008832001,0.00060871895,0.0004588253,0.0005409821,0.00060268276],"domain_scores_gemma":[0.998925,0.00005588662,0.000093379495,0.0005746222,0.00011027945,0.00024088405],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022976773,0.00045618904,0.00040836039,0.00036737663,0.00029415326,0.00015389311,0.00025486833,0.00030093093,0.0003220079],"category_scores_gemma":[0.0000021232374,0.00043402062,0.00016814854,0.0006668494,0.00003911744,0.0002894111,0.0000014537263,0.0004674024,0.0002643022],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015495798,0.000282921,0.0000070235455,0.00012343869,0.0002930443,0.00005769826,0.00027375543,0.9938008,0.0027643305,0.00083641364,0.0013351152,0.00007050992],"study_design_scores_gemma":[0.0739596,0.019248253,0.0009602327,0.0053452607,0.0052532214,0.004545774,0.014980371,0.5410973,0.25026605,0.00039079948,0.06458311,0.019370044],"about_ca_topic_score_codex":0.00021064981,"about_ca_topic_score_gemma":0.000063901694,"teacher_disagreement_score":0.85075706,"about_ca_system_score_codex":0.0012077627,"about_ca_system_score_gemma":0.00017391582,"threshold_uncertainty_score":0.9998112},"labels":[],"label_agreement":null},{"id":"W2099961809","doi":"","title":"Manitoba Hydro wind power reserve requirements","year":2009,"lang":"en","type":"article","venue":"2009 CIGRE/IEEE PES Joint Symposium Integration of Wide-Scale Renewable Resources Into the Power Delivery System","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Manitoba Hydro","funders":"","keywords":"Wind power; Hydro power; Environmental science; Natural resource economics; Engineering; Economics; Environmental engineering; Electrical engineering","score_opus":0.010243348306039523,"score_gpt":0.20426251931476724,"score_spread":0.19401917100872773,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099961809","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8325091,0.005364636,0.060565595,0.0012108684,0.003522892,0.002619666,0.000081166756,0.0016731143,0.09245295],"genre_scores_gemma":[0.99631226,0.00031251583,0.0010540085,0.00014198525,0.00024498973,0.000052168958,0.000047965448,0.00013034778,0.0017037417],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9941039,0.0005412328,0.0022069218,0.00080039084,0.0014168057,0.00093071506],"domain_scores_gemma":[0.99640626,0.00023964919,0.000771358,0.0016083575,0.00068817957,0.00028621295],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001551506,0.0008486189,0.0010793972,0.0007535363,0.00041932933,0.00029300194,0.0011170483,0.0004718866,0.00009181519],"category_scores_gemma":[0.00008677126,0.00068805844,0.00048318907,0.0010546444,0.00015558927,0.0008603905,0.00008453982,0.0005088365,0.00015934237],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003542472,0.0003024559,0.0009390373,0.0006254194,0.00062120106,0.000051622355,0.016277619,0.6051536,0.32798633,0.00019781456,0.04566794,0.0018227012],"study_design_scores_gemma":[0.0031301735,0.00265788,0.0020998493,0.0063021136,0.00066761853,0.00044699726,0.015671035,0.3871416,0.5444104,0.0003917894,0.033643223,0.0034373023],"about_ca_topic_score_codex":0.0020886073,"about_ca_topic_score_gemma":0.00086120627,"teacher_disagreement_score":0.21801202,"about_ca_system_score_codex":0.0011955173,"about_ca_system_score_gemma":0.00008464092,"threshold_uncertainty_score":0.9995571},"labels":[],"label_agreement":null},{"id":"W2099975670","doi":"10.1109/tpwrs.2009.2037153","title":"Fast Computation of Pure Strategy Nash Equilibria in Electricity Markets Cleared by Merit Order","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Clearance; Nash equilibrium; Oligopoly; Electricity market; Mathematical optimization; Constant (computer programming); Block (permutation group theory); Computation; Market power; Order (exchange); Integer programming; Electricity; Linear programming; Computer science; Mathematical economics; Economics; Mathematics; Microeconomics; Engineering; Algorithm; Monopoly; Electrical engineering; Combinatorics","score_opus":0.005021927800946435,"score_gpt":0.20625697614811264,"score_spread":0.2012350483471662,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099975670","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21081972,0.0001729177,0.7832979,0.000012709537,0.0023101831,0.00060154893,0.000058383823,0.0002848875,0.0024417841],"genre_scores_gemma":[0.99937564,0.00002139196,0.00019527071,0.000005393848,0.000012686024,0.00006548685,0.000014022385,0.00007257184,0.00023751236],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981828,0.0001299153,0.00067607936,0.00029317243,0.00034721332,0.00037083498],"domain_scores_gemma":[0.9992556,0.00008472566,0.00011769686,0.00029460143,0.00015236602,0.000095012896],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003124889,0.00026690593,0.00039514297,0.00039613104,0.000052386895,0.0000657681,0.00019030434,0.00029222196,0.000061906845],"category_scores_gemma":[0.000007821109,0.00029705188,0.00007356758,0.0011726181,0.000026955655,0.0002869519,7.803552e-7,0.00052870566,0.00002686406],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008233742,0.00023565549,0.00006598701,0.00025887627,0.00012690037,0.000005573308,0.00045145588,0.7650148,0.22973007,0.000050420036,0.0021765796,0.0018013424],"study_design_scores_gemma":[0.0012713409,0.00022524319,0.00032541298,0.00015720911,0.0000338235,0.00004970072,0.00017050905,0.9665996,0.03019148,0.000010257976,0.00044859387,0.0005168224],"about_ca_topic_score_codex":0.0001430443,"about_ca_topic_score_gemma":0.00015149389,"teacher_disagreement_score":0.7885559,"about_ca_system_score_codex":0.00012702742,"about_ca_system_score_gemma":0.00005962566,"threshold_uncertainty_score":0.99994814},"labels":[],"label_agreement":null},{"id":"W2100018616","doi":"10.4236/ajor.2011.14031","title":"Optimal Generator Portfolio in Day-Ahead Market under Uncertain Carbon Tax Policy","year":2011,"lang":"en","type":"article","venue":"American Journal of Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Portfolio; Carbon tax; Bidding; Robustness (evolution); Flexibility (engineering); Electricity market; Economics; Generator (circuit theory); Computer science; Electricity; Microeconomics; Finance; Power (physics); Greenhouse gas; Engineering","score_opus":0.040948568793657304,"score_gpt":0.32574030808831855,"score_spread":0.28479173929466123,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2100018616","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96396637,0.000270189,0.013748787,0.0002921928,0.00021942283,0.00025572884,0.00000705173,0.00003130945,0.021208975],"genre_scores_gemma":[0.98940814,0.00021281137,0.009524322,0.000024432607,0.00025219875,0.000022155178,0.0000024880478,0.00004281273,0.0005106186],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99785817,0.00042632894,0.0005722846,0.00014277553,0.0005305941,0.00046984077],"domain_scores_gemma":[0.9989128,0.00008939474,0.00005337265,0.0002622135,0.0004834214,0.00019879539],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017838315,0.00013621358,0.0002818778,0.0014173697,0.00007948415,0.000076873315,0.0003467413,0.000049944374,0.00024893138],"category_scores_gemma":[0.00025457988,0.00012905264,0.00005103603,0.0021672347,0.00014901326,0.00025982148,0.000033381097,0.0006311969,0.0000074680606],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000066733344,0.00016806975,0.0041704336,0.000016144897,0.00015120476,0.00016146016,0.0028405937,0.97079283,0.0078114527,0.0013999209,0.0052150185,0.007206157],"study_design_scores_gemma":[0.0012568962,0.001391532,0.01900881,0.00012877812,0.000023793378,0.00058308546,0.003207268,0.96637046,0.006103448,0.0000814482,0.0012392652,0.0006052152],"about_ca_topic_score_codex":0.0021715986,"about_ca_topic_score_gemma":0.00037518214,"teacher_disagreement_score":0.025441818,"about_ca_system_score_codex":0.00044216964,"about_ca_system_score_gemma":0.00071458414,"threshold_uncertainty_score":0.5262614},"labels":[],"label_agreement":null},{"id":"W2100381764","doi":"10.1109/pes.2011.6038938","title":"Including a combined fuzzy and probabilistic load model in transmission energy loss evaluation: Experience at BC Hydro","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Probabilistic logic; Fuzzy logic; Computer science; Energy (signal processing); Transmission (telecommunications); Probability distribution; Probabilistic forecasting; Reliability engineering; Electric power system; Power (physics); Power transmission; Load profile; Load distribution; Electric power transmission; Mathematical optimization; Engineering; Statistics; Mathematics; Electricity; Telecommunications; Electrical engineering; Artificial intelligence","score_opus":0.03711856466967493,"score_gpt":0.24108555343257662,"score_spread":0.2039669887629017,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2100381764","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63601816,0.0007198843,0.31352648,0.000026397629,0.00011167666,0.00048271217,6.388065e-7,0.00029353282,0.04882049],"genre_scores_gemma":[0.9966014,0.00006180947,0.0029152222,0.000014295546,0.0000062474774,0.00012365749,0.0000036933925,0.000020646827,0.00025300105],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990191,0.000040167844,0.0002678825,0.00021391749,0.000259459,0.00019950254],"domain_scores_gemma":[0.99966425,0.000025419593,0.00002466054,0.0001557042,0.000058734262,0.00007121372],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025513515,0.00013563006,0.000148332,0.00009074612,0.000047848906,0.000012837583,0.00008829817,0.00008024147,0.00008337797],"category_scores_gemma":[0.000026187288,0.0001299259,0.000016403887,0.00025848197,0.000021072841,0.00024038785,0.000027889375,0.00005154337,0.0000030429405],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000065072156,0.000068801855,0.001063476,0.000121610086,0.000014435017,0.0000072022694,0.012888819,0.97050726,0.005738258,0.004087605,0.000093389965,0.005344076],"study_design_scores_gemma":[0.0006138088,0.00003041054,0.00015851881,0.000048698177,0.000008622262,0.0000065309123,0.000028687546,0.99245083,0.0048460728,0.0016222626,0.000023031787,0.00016254434],"about_ca_topic_score_codex":0.00012666409,"about_ca_topic_score_gemma":0.00010147749,"teacher_disagreement_score":0.36058325,"about_ca_system_score_codex":0.000388419,"about_ca_system_score_gemma":0.00004132453,"threshold_uncertainty_score":0.52982247},"labels":[],"label_agreement":null},{"id":"W2101054729","doi":"10.1109/pes.2007.386161","title":"Optimal Reactive Power Planning and Compensation Effects on Transmission Loss Components","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"AC power; Activity-based costing; Electric power transmission; Power-flow study; Compensation (psychology); Transmission (telecommunications); Computer science; Transmission line; Power transmission; Power (physics); Electricity market; Electricity; Engineering; Electrical engineering; Telecommunications; Voltage; Business","score_opus":0.005959586142731806,"score_gpt":0.2118546305941833,"score_spread":0.2058950444514515,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2101054729","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62497437,0.00044681667,0.37255687,0.000015920434,0.0007826119,0.00022052349,0.0000016529794,0.00048737676,0.00051383144],"genre_scores_gemma":[0.9682698,0.00001790979,0.03130938,0.000053823045,0.00018679228,0.000012705964,0.000015066771,0.000111816946,0.000022695789],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982685,0.00003312568,0.00039220595,0.00035167343,0.00035034932,0.0006041788],"domain_scores_gemma":[0.9991924,0.00032466138,0.00007127773,0.00017654021,0.000053485623,0.00018162701],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00067581463,0.00037883964,0.00031631454,0.00012436803,0.00013520803,0.000063709,0.00012099428,0.00022960706,0.0000029085923],"category_scores_gemma":[0.000030773117,0.00041600375,0.00012388897,0.0003013124,0.000017840439,0.00020038786,0.000016195845,0.0004151555,0.0000058079895],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015859356,0.000013393,0.00029957163,0.000109543056,0.00008175752,0.000016084317,0.002045384,0.69929683,0.2974882,0.000023226963,0.00020895415,0.0004011901],"study_design_scores_gemma":[0.0008336681,0.000120502526,0.0050772103,0.00062139664,0.000029775367,0.0000375924,0.00008053943,0.7382757,0.2536308,0.0000029298403,0.0006872369,0.0006026577],"about_ca_topic_score_codex":0.000007520886,"about_ca_topic_score_gemma":1.4392104e-7,"teacher_disagreement_score":0.3432954,"about_ca_system_score_codex":0.00027508082,"about_ca_system_score_gemma":0.000008584875,"threshold_uncertainty_score":0.9998292},"labels":[],"label_agreement":null},{"id":"W2104690181","doi":"10.1109/tpwrs.2008.920729","title":"Electricity Markets Cleared by Merit Order—Part II: Strategic Offers and Market Power","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Clearance; Electricity market; Profit (economics); Market power; Economics; Linear programming; Electric power system; Order (exchange); Electricity; Integer programming; Nash equilibrium; Identification (biology); Scheme (mathematics); Computer science; Microeconomics; Mathematical optimization; Operations research; Power (physics); Mathematics; Engineering; Monopoly","score_opus":0.008896303743794999,"score_gpt":0.18282555306744513,"score_spread":0.17392924932365014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2104690181","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20663245,0.0022261988,0.7347267,0.00007899119,0.005680531,0.0015261756,0.00021410223,0.0016221928,0.047292624],"genre_scores_gemma":[0.9940602,0.0005850329,0.0000919771,0.000036516554,0.000017034174,0.00011866773,0.000009115146,0.00012033768,0.0049611074],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975659,0.00021197098,0.0006252346,0.0004960222,0.0004736088,0.00062725984],"domain_scores_gemma":[0.9989338,0.00011377163,0.00009666168,0.0004755759,0.00013446863,0.0002457123],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032792645,0.00045885766,0.00050682516,0.00033836276,0.00042600278,0.0000909351,0.0002097399,0.0003042289,0.00035568254],"category_scores_gemma":[0.000006638809,0.0004899367,0.00010420192,0.0009353518,0.00006679265,0.00032112875,0.0000016665506,0.00043743462,0.000051659623],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017616,0.0024964605,0.0005167965,0.0016185987,0.0041897143,0.00041369902,0.006180726,0.29952168,0.039016463,0.0004472903,0.6426008,0.0012362021],"study_design_scores_gemma":[0.010975145,0.004330874,0.0012672205,0.001205614,0.00059098064,0.0044479887,0.0017959025,0.77540207,0.042595483,0.0000437623,0.14968072,0.0076642195],"about_ca_topic_score_codex":0.00007020019,"about_ca_topic_score_gemma":0.0000105202835,"teacher_disagreement_score":0.7874278,"about_ca_system_score_codex":0.00028368307,"about_ca_system_score_gemma":0.00006871602,"threshold_uncertainty_score":0.9997552},"labels":[],"label_agreement":null},{"id":"W2104938392","doi":"10.3905/jsf.2000.320213","title":"The Development of the Merchant Power Market in Alberta","year":2000,"lang":"en","type":"article","venue":"The journal of structured finance","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Deregulation; Business; Web syndication; Hydroelectricity; Power market; Market power; Power (physics); Government (linguistics); Finance; Market economy; Economics; Monopoly; Engineering; Electric power system","score_opus":0.002961072208725651,"score_gpt":0.1728979338892391,"score_spread":0.16993686168051345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2104938392","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9828736,0.003153191,0.0043990677,0.00034139736,0.0010775256,0.00033796154,0.0000027952574,0.000010502835,0.0078039556],"genre_scores_gemma":[0.99807996,0.00022482603,0.0008610343,0.000015975944,0.000022443603,0.0000022470153,1.2448406e-7,0.000014289274,0.00077912357],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99893105,0.00006984613,0.00052659196,0.000053252308,0.0002362368,0.00018301203],"domain_scores_gemma":[0.9994037,0.00012710119,0.00017334196,0.00022947918,0.00005083677,0.000015549533],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046802315,0.00010829374,0.00015472143,0.00003548733,0.00008781365,0.000012395262,0.0005043154,0.000055088603,0.00005055763],"category_scores_gemma":[0.000021669071,0.00005270733,0.00004088591,0.00033169283,0.00003509122,0.000060230563,0.000016743305,0.00025843023,0.0000016545047],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006544294,0.000059185255,0.0068042614,0.00012710397,0.00043202948,0.000014732051,0.026900182,0.71991104,0.00693846,0.00084482273,0.01593455,0.22137919],"study_design_scores_gemma":[0.0027639228,0.00016954668,0.6790467,0.0008710323,0.00007866448,0.00069333374,0.0003494115,0.053986814,0.023555648,0.0024357857,0.23526691,0.0007822677],"about_ca_topic_score_codex":0.000013677507,"about_ca_topic_score_gemma":0.00055868144,"teacher_disagreement_score":0.6722424,"about_ca_system_score_codex":0.000086388485,"about_ca_system_score_gemma":0.00007745646,"threshold_uncertainty_score":0.21493426},"labels":[],"label_agreement":null},{"id":"W2105207191","doi":"10.1111/joie.12081","title":"Strategic Investment under Open Access: Theory and Evidence","year":2015,"lang":"en","type":"article","venue":"Journal of Industrial Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Competitor analysis; Incentive; Investment (military); Business; Industrial organization; Ceteris paribus; Market share; Investment strategy; Microeconomics; Monetary economics; Economics; Finance; Marketing","score_opus":0.2607980158913065,"score_gpt":0.3314524652436848,"score_spread":0.0706544493523783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105207191","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98033667,0.002835049,0.0036545915,0.00038830368,0.00208762,0.0003310122,0.000002256192,0.00002302228,0.010341472],"genre_scores_gemma":[0.9984734,0.00050665933,0.00038434332,0.00015254594,0.000413648,0.0000022738166,4.948018e-7,0.00001788293,0.000048727426],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99924695,0.000083994724,0.00043759012,0.00006920417,0.00005391742,0.00010833481],"domain_scores_gemma":[0.9993046,0.00012829095,0.00024332806,0.00009992804,0.000062995765,0.00016089276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015976903,0.00008963109,0.00021669506,0.00010679404,0.000017503353,0.0004827756,0.00046370164,0.0001039734,0.000014671519],"category_scores_gemma":[0.00015160826,0.000082140825,0.000023152563,0.00008942431,0.000016743581,0.0016149768,0.000095768424,0.00020531457,0.000003536221],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034069084,0.000029188483,0.001066935,0.00001623407,0.0002657034,0.000010381659,0.00033035225,0.94898397,0.00005675341,0.036249056,0.00909288,0.0035578632],"study_design_scores_gemma":[0.037957527,0.0047496054,0.0010556234,0.003588768,0.00093933544,0.002514269,0.009805636,0.2679493,0.009679883,0.63399905,0.02423242,0.003528582],"about_ca_topic_score_codex":0.000011013339,"about_ca_topic_score_gemma":0.000005809572,"teacher_disagreement_score":0.6810346,"about_ca_system_score_codex":0.00034541034,"about_ca_system_score_gemma":0.00038012915,"threshold_uncertainty_score":0.46554163},"labels":[],"label_agreement":null},{"id":"W2105225820","doi":"10.1016/j.enpol.2009.07.064","title":"Complementarity of hydro and wind power: Improving the risk profile of energy inflows","year":2009,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":103,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Bank of Canada; Bank of Canada; Group for Research in Decision Analysis; HEC Montréal","funders":"","keywords":"Wind power; Renewable energy; Portfolio; Hydropower; Hydroelectricity; Environmental science; Diversification (marketing strategy); Inflow; Risk measure; Wind speed; Value at risk; Natural resource economics; Economics; Meteorology; Risk management; Business; Engineering; Geography; Financial economics; Finance","score_opus":0.0037814979305988,"score_gpt":0.19627018351151376,"score_spread":0.19248868558091498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105225820","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.906735,0.0023778556,0.046744034,0.00029097704,0.00024385533,0.0002506862,0.000107390726,0.00024965822,0.043000553],"genre_scores_gemma":[0.99907696,0.00011284185,0.00056482304,0.00006578151,0.0000705337,0.000003707233,0.000010891905,0.00001478478,0.00007969758],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992224,0.00005132771,0.00029818763,0.00010550247,0.00012964847,0.0001929381],"domain_scores_gemma":[0.99951446,0.00004766736,0.00012063266,0.00024409711,0.00003226065,0.000040883457],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012636486,0.00011813709,0.00018307776,0.00013596695,0.000045528213,0.000010183024,0.00013489694,0.000053279615,0.00001730852],"category_scores_gemma":[0.000034037304,0.000097618,0.000037662638,0.0003116177,0.000029917888,0.000080476144,0.00002786157,0.000064643915,3.051814e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007390767,0.0002490396,0.008050114,0.0002237106,0.0005544756,0.000004651256,0.004121638,0.43400106,0.12007995,0.27594745,0.005618513,0.15107548],"study_design_scores_gemma":[0.0022586049,0.0008303012,0.0370621,0.00011516464,0.00013506191,0.000033736997,0.00014851772,0.5801871,0.35085616,0.0039334404,0.02357197,0.000867881],"about_ca_topic_score_codex":0.005053227,"about_ca_topic_score_gemma":0.00018881739,"teacher_disagreement_score":0.27201402,"about_ca_system_score_codex":0.00005129861,"about_ca_system_score_gemma":0.000035517525,"threshold_uncertainty_score":0.7639001},"labels":[],"label_agreement":null},{"id":"W2105822997","doi":"10.1109/pess.2001.970292","title":"Assessment of transmission congestion cost and locational marginal pricing in a competitive electricity market","year":2001,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Computer science; Electricity market; Reliability (semiconductor); Transmission (telecommunications); Transmission network; Electricity; Transmission system; Marginal cost; Electric power transmission; Reliability engineering; Network topology; Stability (learning theory); Mathematical optimization; Computer network; Telecommunications; Engineering; Economics; Electrical engineering; Power (physics); Mathematics","score_opus":0.006011406370333492,"score_gpt":0.22922993772757191,"score_spread":0.22321853135723843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105822997","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.098242834,0.00021370123,0.8342539,0.000060789902,0.000037119113,0.00036617983,0.0000015558788,0.00007148348,0.06675243],"genre_scores_gemma":[0.99367476,0.00029754572,0.0058630086,0.000008400877,0.0000081760145,0.000016603264,0.000010359378,0.000009142447,0.00011198131],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993732,0.00004412277,0.00021190914,0.000105470055,0.00013486805,0.0001304122],"domain_scores_gemma":[0.99974203,0.00008923083,0.000029665525,0.000051656956,0.00005237954,0.00003503127],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023814646,0.00008091193,0.00013143607,0.00016783945,0.000016491116,0.000009260419,0.000035028075,0.000047554564,0.00010467806],"category_scores_gemma":[0.000010471056,0.0000820784,0.000011204113,0.00038512988,0.0000113569195,0.00010487423,0.0000041283124,0.00008922475,4.6336817e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017596269,0.00041632156,0.4898228,0.0007581568,0.00012715827,0.00003197777,0.00055320445,0.34985325,0.039988257,0.034768216,0.0008941281,0.08261057],"study_design_scores_gemma":[0.00038723007,0.000031012984,0.3470444,0.000067120774,0.0000048627094,0.00001749218,0.000016948681,0.651535,0.000557664,0.000023819845,0.00024346793,0.000071008646],"about_ca_topic_score_codex":0.00003350533,"about_ca_topic_score_gemma":0.000030144613,"teacher_disagreement_score":0.89543194,"about_ca_system_score_codex":0.000161118,"about_ca_system_score_gemma":0.000033637603,"threshold_uncertainty_score":0.334706},"labels":[],"label_agreement":null},{"id":"W2106109980","doi":"10.1109/tpwrs.2012.2210574","title":"Options based reserve procurement strategy for wind generators - Using binomial trees","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Wind power; Procurement; Renewable energy; Electricity market; Activity-based costing; Electricity; Economics; Purchasing; Reserve requirement; Environmental economics; Computer science; Business; Operations management; Engineering; Electrical engineering","score_opus":0.04232265863417425,"score_gpt":0.25897634296121874,"score_spread":0.2166536843270445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106109980","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026151326,0.00067376,0.9658328,0.000010467751,0.005039704,0.0013983829,0.00012820408,0.00038982602,0.00037547143],"genre_scores_gemma":[0.99730253,0.000008102143,0.0019533075,0.000010093371,0.00012054148,0.00030459862,0.000013487333,0.00010183541,0.0001854775],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982662,0.000104455255,0.0005202109,0.00024379138,0.00029823752,0.0005670967],"domain_scores_gemma":[0.99917185,0.000070922855,0.00008258736,0.000362819,0.00012100687,0.0001907883],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00041479766,0.00029871482,0.00029340675,0.00036652098,0.00023507707,0.000114017515,0.00014929245,0.00019822847,0.000038385188],"category_scores_gemma":[0.0000037702978,0.00030789277,0.00014990654,0.00044956835,0.000018782139,0.00042285124,4.7894434e-7,0.00017241301,0.000023563873],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023791767,0.0001224401,0.000039644863,0.00011428247,0.00011235216,5.268097e-7,0.00016025397,0.9912555,0.007398837,0.000084207255,0.00063567644,0.00005245789],"study_design_scores_gemma":[0.0011084891,0.00022482607,0.000040164825,0.00014245797,0.00012965527,0.000018583014,0.00016455575,0.95750964,0.03737059,0.0000017647156,0.0027689503,0.0005203312],"about_ca_topic_score_codex":0.0000655814,"about_ca_topic_score_gemma":0.000033006756,"teacher_disagreement_score":0.97115123,"about_ca_system_score_codex":0.0004847887,"about_ca_system_score_gemma":0.00008762468,"threshold_uncertainty_score":0.9999373},"labels":[],"label_agreement":null},{"id":"W2106877775","doi":"10.1049/iet-gtd.2012.0573","title":"Fuzzy security constraints for unit commitment with outages","year":2013,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Power system simulation; Fuzzy logic; Integer programming; Computer science; Mathematical optimization; Schedule; Electric power system; Linear programming; Electric power transmission; Transmission line; Power (physics); Reliability engineering; Engineering; Algorithm; Mathematics","score_opus":0.01222486487577415,"score_gpt":0.21512949329937173,"score_spread":0.20290462842359758,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106877775","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040814463,0.000203829,0.9558967,0.00038731797,0.0002091459,0.0012343847,0.00020374663,0.0003404103,0.00071001286],"genre_scores_gemma":[0.992854,0.00006137024,0.002806612,0.000032085936,0.00010384535,0.00036482306,0.0036669802,0.00002799594,0.00008230704],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989501,0.00005154568,0.00031420297,0.00021390685,0.00020961819,0.00026061977],"domain_scores_gemma":[0.9993942,0.00003062489,0.000053034546,0.00016869667,0.00022316352,0.0001303214],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014964442,0.00019966427,0.0001704493,0.000047354857,0.00017220808,0.00010404187,0.000082945495,0.00013083266,0.0001420706],"category_scores_gemma":[0.000009714441,0.0001748798,0.000052570304,0.00020926722,0.00003537843,0.00028742242,0.000003025108,0.00009906103,0.000027034328],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013688729,0.0005465559,0.0015493212,0.00089813076,0.00043767004,0.000005906653,0.0018122877,0.39709798,0.22245646,0.0142647335,0.1949322,0.16586187],"study_design_scores_gemma":[0.0025826548,0.0003394145,0.0010602154,0.00011302005,0.00009794652,0.000022369572,0.00012794741,0.80858034,0.15350762,0.0007815432,0.032100406,0.00068651873],"about_ca_topic_score_codex":0.000009492748,"about_ca_topic_score_gemma":0.000006561147,"teacher_disagreement_score":0.9530901,"about_ca_system_score_codex":0.00012783326,"about_ca_system_score_gemma":0.000039015275,"threshold_uncertainty_score":0.71313906},"labels":[],"label_agreement":null},{"id":"W2107073001","doi":"10.3138/infor.48.4.239","title":"Analysis of Quantized Double Auctions with Application to Competitive Electricity Markets","year":2010,"lang":"en","type":"article","venue":"INFOR Information Systems and Operational Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Common value auction; Maximization; Electricity; Computer science; Microeconomics; Double auction; Economics; Competition (biology); Electricity market; Mathematical optimization; Mathematics; Engineering; Electrical engineering","score_opus":0.014404993927121702,"score_gpt":0.29294525502716917,"score_spread":0.2785402611000475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107073001","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4526717,0.000052685707,0.49715197,0.0001434303,0.00022659556,0.0024516054,0.00012720007,0.00016425105,0.047010563],"genre_scores_gemma":[0.99839586,0.0000142323215,0.00086361857,0.000013895674,0.000030760737,0.00033542924,0.0002333783,0.000007407113,0.00010540249],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984992,0.0000355991,0.00049829297,0.000097101074,0.0006673268,0.00020245291],"domain_scores_gemma":[0.998107,0.00015667762,0.00006747301,0.000197461,0.0013642575,0.000107137836],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011428056,0.00009893514,0.00021464344,0.0012729339,0.00018476449,0.0002153346,0.00011893156,0.00008773814,0.000026856413],"category_scores_gemma":[0.00007300177,0.00008570409,0.000027795222,0.002442674,0.000040065308,0.00097138074,0.000020719903,0.00022596482,0.000037353275],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028955954,0.000033904253,0.0077723432,0.00023959915,0.00069901155,2.6794197e-7,0.0019983705,0.7093118,0.0046152333,0.27130532,0.0010638552,0.0026707419],"study_design_scores_gemma":[0.0006293488,0.00007783898,0.018289339,0.000022018397,0.000042631542,0.000010176089,0.000379377,0.95650095,0.0014591272,0.000004110856,0.022425098,0.00015998121],"about_ca_topic_score_codex":0.00028694636,"about_ca_topic_score_gemma":0.00020739694,"teacher_disagreement_score":0.54572415,"about_ca_system_score_codex":0.00007559762,"about_ca_system_score_gemma":0.00010935359,"threshold_uncertainty_score":0.34949112},"labels":[],"label_agreement":null},{"id":"W2107818050","doi":"10.1109/pes.2007.385587","title":"A Reactive Power Model for a Simultaneous Real and Reactive Power Dispatch","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Natural Sciences and Engineering Research Council of Canada; Manitoba Hydro","keywords":"AC power; Power (physics); Computer science; Generator (circuit theory); Electricity; Economic dispatch; Component (thermodynamics); Electric power system; Power-flow study; Constraint (computer-aided design); Engineering; Electrical engineering","score_opus":0.005461020930247967,"score_gpt":0.2153984982752598,"score_spread":0.20993747734501184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107818050","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41947526,0.00032079426,0.5767344,0.000024791021,0.0008000124,0.0005419208,0.000028763185,0.00073417905,0.00133986],"genre_scores_gemma":[0.92854214,0.00005822775,0.07059791,0.00005687653,0.00018494332,0.00007642776,0.000016008005,0.00023383331,0.00023365968],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99736637,0.000020193344,0.0006012688,0.00058896205,0.00036053985,0.0010626792],"domain_scores_gemma":[0.9984149,0.0006345626,0.00012607072,0.00034818397,0.00021635016,0.00025998557],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009209292,0.0005610739,0.00049707503,0.00012646375,0.00015720197,0.00009201621,0.00020313343,0.00038673932,0.000003224763],"category_scores_gemma":[0.00021738657,0.0006280689,0.00026743393,0.00040749693,0.000035260702,0.000315875,0.000042468106,0.00045063888,0.000003407476],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033078948,0.0000269208,0.00008361183,0.00008697171,0.00021789651,0.000010374369,0.00621193,0.8415026,0.15079677,0.00013675661,0.00073632965,0.000156744],"study_design_scores_gemma":[0.000618255,0.00008651478,0.000089054614,0.000114588845,0.00005032898,0.000031703457,0.00029950167,0.98158944,0.016015,0.000024661971,0.00037748078,0.0007034526],"about_ca_topic_score_codex":0.000042954085,"about_ca_topic_score_gemma":0.00001109186,"teacher_disagreement_score":0.5090669,"about_ca_system_score_codex":0.00056858186,"about_ca_system_score_gemma":0.00004160773,"threshold_uncertainty_score":0.99961704},"labels":[],"label_agreement":null},{"id":"W2107890899","doi":"10.1109/ccece.2001.933587","title":"Counter-flow in a deregulated power system network and its effect on transmission loss allocation","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Generator (circuit theory); Computer science; Transmission (telecommunications); Flow (mathematics); Transmission loss; Electric power system; Transmission system; Power-flow study; Power (physics); Telecommunications; Mathematics","score_opus":0.003811469292738933,"score_gpt":0.17129057429562752,"score_spread":0.1674791050028886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107890899","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6307339,0.007170665,0.3247252,0.00013587195,0.00084850774,0.0020216592,0.0000027963226,0.0018206685,0.032540683],"genre_scores_gemma":[0.9994264,0.000053131567,0.00022246088,0.000015218107,0.00002450201,0.000025023166,0.000006737906,0.000032266762,0.00019423327],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916077,0.00007187165,0.0002275942,0.00017180976,0.00013761889,0.00023032194],"domain_scores_gemma":[0.9997184,0.00006459278,0.000020898013,0.000117112155,0.000021692951,0.000057285815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019562071,0.00015575453,0.00018255011,0.000102190075,0.000030474599,0.000027702134,0.000054900836,0.00012466741,0.00005595273],"category_scores_gemma":[0.0000058351043,0.00013797429,0.000020498752,0.000360835,0.0000037663858,0.00011004903,0.0000037539294,0.00009466711,0.00004383551],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028927116,0.000021686586,0.0003890625,0.00039209137,0.000030204099,0.000017310987,0.0003193895,0.991206,0.00072031544,0.00031003973,0.0012863514,0.005278622],"study_design_scores_gemma":[0.00060817087,0.00012632336,0.00049607403,0.00043127785,0.000007883827,0.00002411335,0.0000048745437,0.9964943,0.0014209575,0.0000012991251,0.0002393563,0.00014536269],"about_ca_topic_score_codex":0.0000042877846,"about_ca_topic_score_gemma":0.0000054521165,"teacher_disagreement_score":0.3686925,"about_ca_system_score_codex":0.00015421095,"about_ca_system_score_gemma":0.0000023413972,"threshold_uncertainty_score":0.5626429},"labels":[],"label_agreement":null},{"id":"W2108380909","doi":"10.4236/ti.2010.12014","title":"Sub-Optimal Generation Portfolio Variance with Rate of Return Regulation","year":2010,"lang":"en","type":"article","venue":"Technology and Investment","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Rate of return on a portfolio; Portfolio; Rate of return; Asset (computer security); Marginal cost; Transmission (telecommunications); Portfolio optimization; Capital asset pricing model; Economics; Econometrics; Microeconomics; Computer science; Financial economics; Finance; Telecommunications","score_opus":0.004185490051088809,"score_gpt":0.17389536423253707,"score_spread":0.16970987418144826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2108380909","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9598972,0.00019862028,0.03805031,0.00010162218,0.000120697914,0.00016313262,9.902279e-7,0.0002225624,0.001244858],"genre_scores_gemma":[0.989866,0.000026682039,0.0099412305,0.000030686,0.000022100436,0.000024142619,0.000011230089,0.00001094738,0.00006694828],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99961627,0.000007792903,0.0001372676,0.000104367085,0.000039747712,0.00009455486],"domain_scores_gemma":[0.99972737,0.000004864588,0.00005017206,0.00016298077,0.00003613337,0.000018506144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010048005,0.000075609845,0.000095616284,0.00018104295,0.000028603064,0.000005584457,0.0000426422,0.00015012325,0.000009583789],"category_scores_gemma":[0.000010280059,0.000067824105,0.000006115199,0.0002906572,0.0000627003,0.00008746812,0.000008042216,0.00011812176,0.0000015444438],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000879038,0.0000166005,0.0015262042,0.000026537198,0.00003937246,0.0000023429989,0.00006311983,0.008145694,0.7966012,0.19146457,0.00070071954,0.0014048667],"study_design_scores_gemma":[0.0003752659,0.00015627441,0.0022433447,0.000018300665,0.000022710097,0.000048351612,0.000007936994,0.23459667,0.75828034,0.0030446942,0.0010641477,0.00014194325],"about_ca_topic_score_codex":0.0000019971283,"about_ca_topic_score_gemma":0.000010172778,"teacher_disagreement_score":0.22645098,"about_ca_system_score_codex":0.000015407777,"about_ca_system_score_gemma":0.000013095029,"threshold_uncertainty_score":0.27657866},"labels":[],"label_agreement":null},{"id":"W2108794066","doi":"","title":"\"Gansch het raderwerk staat stil.\" De kosten van stroomstoringen","year":2003,"lang":"nl","type":"article","venue":"UvA-DARE (University of Amsterdam)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.007356978181927423,"score_gpt":0.17307464090910882,"score_spread":0.1657176627271814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2108794066","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35127702,0.00696503,0.49318615,0.00063361635,0.0031791604,0.0018880834,0.00044135746,0.0009361597,0.1414934],"genre_scores_gemma":[0.97770375,0.00028178608,0.008869596,0.000026895985,0.00009881815,7.0911426e-7,0.000048791193,0.00010336356,0.012866294],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972141,0.00032560533,0.00038960946,0.0005884079,0.00055258337,0.0009297108],"domain_scores_gemma":[0.99816835,0.00012393476,0.0002937715,0.00079054997,0.0002417418,0.00038165294],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00047504378,0.00049049937,0.0007069209,0.0004671368,0.0003057125,0.00006755228,0.0006904685,0.00044174935,0.001576002],"category_scores_gemma":[0.000079472986,0.0007245688,0.00027486225,0.00088229973,0.000108231216,0.00064042606,0.00012935074,0.0004844671,0.00032889238],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012464905,0.0021319776,0.12285878,0.010706501,0.008281119,0.0027169124,0.10959562,0.53629535,0.027186679,0.015741374,0.11826535,0.044973873],"study_design_scores_gemma":[0.02368686,0.003441197,0.04427146,0.0043659257,0.0038748363,0.00066365174,0.06511296,0.13302442,0.01589277,0.0009071766,0.69598335,0.008775369],"about_ca_topic_score_codex":0.0004276891,"about_ca_topic_score_gemma":0.00023770433,"teacher_disagreement_score":0.6264267,"about_ca_system_score_codex":0.001107129,"about_ca_system_score_gemma":0.00029512236,"threshold_uncertainty_score":0.99952054},"labels":[],"label_agreement":null},{"id":"W2109107914","doi":"10.1109/tpwrs.2004.835638","title":"Pay-as-Bid versus Marginal Pricing—Part I: Strategic Generator Offers","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Tsinghua University","keywords":"Payment; Generator (circuit theory); Economics; Marginal cost; Microeconomics; Electricity market; Yield (engineering); Electricity; Marginal utility; Econometrics; Power (physics); Finance; Engineering; Electrical engineering","score_opus":0.01594394157016829,"score_gpt":0.2158812997562269,"score_spread":0.19993735818605862,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109107914","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03866385,0.00035054775,0.922338,0.00006412107,0.018240523,0.0007594337,0.000044916393,0.0011325345,0.018406073],"genre_scores_gemma":[0.99850273,0.00007536244,0.0001892813,0.000025722038,0.00007981972,0.00014922544,0.000007900338,0.00010960517,0.0008603448],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99801856,0.00006653077,0.000531451,0.00038736954,0.0004661619,0.0005298999],"domain_scores_gemma":[0.9990594,0.00005433242,0.000076966004,0.00050160475,0.00009670978,0.00021099232],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018457496,0.0003833474,0.00036202362,0.0003245038,0.00017392375,0.00015244055,0.00022699648,0.00023779315,0.00010597762],"category_scores_gemma":[0.0000026421073,0.00035758349,0.00014034192,0.0006593384,0.000030183503,0.0002554251,6.8020347e-7,0.0004074431,0.0006391641],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008601996,0.00009269238,0.000002239585,0.00011368492,0.00021557136,0.000035170448,0.00025397982,0.9951869,0.0025867762,0.00091463415,0.00045381094,0.000058492067],"study_design_scores_gemma":[0.044725806,0.010006808,0.000096907315,0.00380024,0.0015530831,0.002175412,0.007942368,0.50045615,0.3432288,0.0003681083,0.074669026,0.0109773055],"about_ca_topic_score_codex":0.00019420827,"about_ca_topic_score_gemma":0.000042500033,"teacher_disagreement_score":0.95983887,"about_ca_system_score_codex":0.0009640171,"about_ca_system_score_gemma":0.00014614376,"threshold_uncertainty_score":0.9998876},"labels":[],"label_agreement":null},{"id":"W2109591158","doi":"10.1260/0309-524x.32.4.355","title":"Using Standard Deviation as a Measure of Increased Operational Reserve Requirement for Wind Power","year":2008,"lang":"en","type":"article","venue":"Wind Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":186,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Manitoba Hydro","funders":"","keywords":"Wind power; Environmental science; Standard deviation; Predictability; Flexibility (engineering); Measure (data warehouse); Electric power system; Power (physics); Statistics; Computer science; Mathematics; Engineering","score_opus":0.02622954555920999,"score_gpt":0.2344191804871257,"score_spread":0.2081896349279157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109591158","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5241191,0.00038825566,0.47412556,0.000012981502,0.00028115668,0.0004348493,0.000024467587,0.00015937697,0.00045424965],"genre_scores_gemma":[0.9789097,0.000009965268,0.020884413,0.000007139602,0.000071762435,0.000012652331,0.000032786927,0.000055387805,0.000016192962],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99888766,0.000014316938,0.00037018178,0.00014993902,0.0003396014,0.00023830484],"domain_scores_gemma":[0.9994676,0.000047333102,0.00004826134,0.00017199392,0.00019794055,0.00006686424],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002877521,0.00016420211,0.00022249785,0.00018011768,0.00006606935,0.000017421466,0.000096652926,0.0000961946,0.000025327488],"category_scores_gemma":[0.00016453175,0.00018751858,0.000061649844,0.0002912761,0.000008688169,0.0002701965,0.00001227579,0.00008246896,0.000002288444],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025085072,0.000008814006,0.0004982431,0.00010018755,0.00007010355,0.0000025251431,0.00029084896,0.9409019,0.057617407,0.00028912383,0.00016566296,0.000030118123],"study_design_scores_gemma":[0.0010672667,0.000115273506,0.0011629366,0.00020192355,0.00003183135,0.000042901076,0.000022334856,0.94438,0.05154899,0.000014654983,0.0010935928,0.00031828333],"about_ca_topic_score_codex":0.00002914958,"about_ca_topic_score_gemma":0.0000027306437,"teacher_disagreement_score":0.4547906,"about_ca_system_score_codex":0.00030346605,"about_ca_system_score_gemma":0.00009190336,"threshold_uncertainty_score":0.7646786},"labels":[],"label_agreement":null},{"id":"W2109883243","doi":"10.1590/s0103-17592003000300006","title":"Transmission loss allocation under combined pool and bilateral operation","year":2003,"lang":"en","type":"article","venue":"Sba Controle & Automação Sociedade Brasileira de Automatica","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Transmission loss; Product (mathematics); Transmission (telecommunications); Computer science; Mathematical optimization; Operations management; Economics; Mathematics; Telecommunications","score_opus":0.005847288060971028,"score_gpt":0.21214645861622436,"score_spread":0.20629917055525332,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109883243","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38765648,0.0006966405,0.60625017,0.00033706278,0.0002580827,0.00094496505,0.0000074176487,0.0018639194,0.0019852463],"genre_scores_gemma":[0.9926302,0.00004770113,0.006488737,0.0003181254,0.00004231171,0.00013056902,0.00004013018,0.00009934044,0.00020291524],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977658,0.00026903016,0.00063524285,0.00037131444,0.00034704804,0.0006116018],"domain_scores_gemma":[0.99908847,0.00016501702,0.00010168282,0.0003334629,0.00008172647,0.00022967033],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00055032637,0.00038790127,0.00045951895,0.00017217235,0.00023330914,0.00023871622,0.00017477764,0.00033289244,0.00012743917],"category_scores_gemma":[0.000067491324,0.0003951573,0.00011007603,0.0003557053,0.000068532296,0.00048352592,0.000013183137,0.00027129616,0.00004194751],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014440449,0.0006875039,0.009809767,0.0014278633,0.0013305442,0.000058352533,0.011996863,0.57848907,0.26727068,0.09209369,0.005212682,0.03147856],"study_design_scores_gemma":[0.0025792131,0.00010792992,0.01650897,0.00008510035,0.000100639394,0.00006198385,0.00013067372,0.9722517,0.0066904556,0.0007676396,0.00024922806,0.00046645143],"about_ca_topic_score_codex":0.000010764496,"about_ca_topic_score_gemma":0.000004523425,"teacher_disagreement_score":0.6049737,"about_ca_system_score_codex":0.00033118713,"about_ca_system_score_gemma":0.0001441235,"threshold_uncertainty_score":0.99985003},"labels":[],"label_agreement":null},{"id":"W2109887918","doi":"10.1109/ccece.2005.1556993","title":"Determination of loss factors in a deregulated system","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Computer science; Transmission loss; Electric power system; Generator (circuit theory); Transmission system; Operator (biology); Profit (economics); Reliability engineering; Transmission (telecommunications); Telecommunications; Power (physics); Engineering; Economics; Microeconomics","score_opus":0.003248807583823899,"score_gpt":0.17057610946844082,"score_spread":0.16732730188461692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109887918","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7565722,0.00004869448,0.23301338,0.0000012931002,0.00008326808,0.000115434865,9.0598417e-7,0.000218407,0.009946427],"genre_scores_gemma":[0.99897057,7.1826514e-7,0.00091047015,2.6814493e-7,0.0000063316293,0.0000037482935,0.000008281298,0.000011244926,0.000088384484],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995597,0.000012363954,0.00021325685,0.000053840515,0.000071545255,0.00008928291],"domain_scores_gemma":[0.99985325,0.000018049828,0.000024207337,0.00007248811,0.000022937038,0.0000090548965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000048407088,0.000057597095,0.00009705843,0.00014413094,0.000004937634,0.000005058439,0.000038802173,0.000051380448,0.0000063192547],"category_scores_gemma":[0.0000035632052,0.000055056757,0.000014436554,0.00028729218,0.0000036241383,0.00006823535,0.0000028376198,0.000023344197,0.000002653634],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007880938,0.000072097995,0.16567859,0.001379109,0.000021734933,0.000020205709,0.00051838113,0.7926126,0.029266762,0.0077510043,0.0003067673,0.0023648518],"study_design_scores_gemma":[0.0002117042,0.00000830607,0.026286885,0.00006116861,0.0000035763594,0.000004929103,0.000040003106,0.9141336,0.05913658,0.000016835664,0.00001010556,0.00008628215],"about_ca_topic_score_codex":0.00021188923,"about_ca_topic_score_gemma":0.00015485637,"teacher_disagreement_score":0.24239837,"about_ca_system_score_codex":0.00011594539,"about_ca_system_score_gemma":0.000004529105,"threshold_uncertainty_score":0.22451495},"labels":[],"label_agreement":null},{"id":"W2110167161","doi":"10.1109/59.852113","title":"Allocation of transmission losses to bilateral contracts in a competitive environment","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":170,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Mathematical optimization; Database transaction; Infinitesimal; Computer science; Component (thermodynamics); Set (abstract data type); Path (computing); Transmission loss; Transmission (telecommunications); Cover (algebra); Transaction cost; Argument (complex analysis); Electric power system; Power (physics); Economics; Mathematics; Microeconomics; Engineering; Telecommunications","score_opus":0.005060380664373658,"score_gpt":0.1880829258552522,"score_spread":0.18302254519087852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110167161","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0738568,0.00018898908,0.9206261,0.00004393471,0.00049074215,0.00083509734,0.000033050565,0.00015352613,0.0037717372],"genre_scores_gemma":[0.99894124,0.00012788663,0.00027795637,0.000015631094,0.0000054567004,0.00011173755,0.0000045444067,0.00003649032,0.0004790674],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99873537,0.00007572138,0.0005015645,0.0002102218,0.0002442077,0.0002329012],"domain_scores_gemma":[0.9995669,0.000055652697,0.000034683577,0.00022015153,0.000024242927,0.000098379],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014502183,0.00018435446,0.00027700627,0.00028065214,0.000031737545,0.000021432623,0.00010267462,0.00011000666,0.0002636572],"category_scores_gemma":[7.866633e-7,0.00018898414,0.00005734587,0.00032190906,0.00001495882,0.00015128062,1.7800778e-7,0.0001344654,0.0001293629],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058635385,0.00013009435,0.000010357127,0.000059737282,0.00003346283,0.0000044376593,0.0012087319,0.98531497,0.010768952,0.000027790556,0.000048039943,0.0023348222],"study_design_scores_gemma":[0.0049753967,0.0016656527,0.0026224165,0.002872175,0.00012684058,0.00012874063,0.00064709113,0.6539404,0.28386968,0.000014197374,0.047332592,0.0018048182],"about_ca_topic_score_codex":0.00013294234,"about_ca_topic_score_gemma":0.00001706384,"teacher_disagreement_score":0.9250844,"about_ca_system_score_codex":0.00021826131,"about_ca_system_score_gemma":0.000016976632,"threshold_uncertainty_score":0.770655},"labels":[],"label_agreement":null},{"id":"W2113075408","doi":"10.1109/pct.2007.4538446","title":"Electricity Markets under Uncertainty","year":2007,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Randomness; Supply and demand; Electricity market; Variance (accounting); Mains electricity; Minification; Economics; Work (physics); Computer science; Econometrics; Microeconomics; Mathematical optimization; Engineering; Mathematics; Electrical engineering","score_opus":0.005152174112361755,"score_gpt":0.2020064040283931,"score_spread":0.19685422991603133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113075408","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03532877,0.00016098176,0.78399247,0.000019808498,0.0002153785,0.0000970627,3.1077911e-7,0.00062337215,0.17956188],"genre_scores_gemma":[0.9971237,0.000018682895,0.0015326712,0.00007869903,0.00004701633,0.000002305239,0.00000360969,0.000019670302,0.0011736335],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993361,0.000010536287,0.00015883779,0.000093346454,0.00011901108,0.000282132],"domain_scores_gemma":[0.99970114,0.00006927258,0.000012031457,0.00012915084,0.000030376032,0.000058032634],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032134377,0.00008766533,0.00008266398,0.00010287155,0.000025304858,0.000014682705,0.00007606056,0.00006639302,0.00015461013],"category_scores_gemma":[0.000016374715,0.00008354726,0.00002453475,0.0004328477,0.000005099069,0.000068241054,0.0000059321687,0.000082952625,0.00006647267],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046981775,0.00006203958,0.002246993,0.00008224183,0.00015680003,0.000021995163,0.00013698135,0.8857284,0.011941139,0.013454468,0.048322987,0.037798975],"study_design_scores_gemma":[0.0006011505,0.000043232292,0.016941153,0.000014671044,0.000018342384,0.00003986809,0.00004421783,0.94305664,0.026617816,0.0006562331,0.011410974,0.0005556807],"about_ca_topic_score_codex":0.000017779646,"about_ca_topic_score_gemma":0.00004892277,"teacher_disagreement_score":0.961795,"about_ca_system_score_codex":0.00016898534,"about_ca_system_score_gemma":0.0000098761775,"threshold_uncertainty_score":0.34069586},"labels":[],"label_agreement":null},{"id":"W2113280736","doi":"10.1109/psce.2006.296434","title":"A Unified Framework for Reactive Power Management in Deregulated Electricity Markets","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity market; Context (archaeology); Electricity; AC power; Electric power system; Computer science; Power (physics); Risk analysis (engineering); Industrial organization; Business; Engineering; Electrical engineering","score_opus":0.0041339290696831435,"score_gpt":0.2018621736173526,"score_spread":0.19772824454766944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113280736","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039324623,0.00013334332,0.8658577,0.00003898425,0.00014466293,0.00082405517,0.0000016678816,0.00040858236,0.09326635],"genre_scores_gemma":[0.96280015,0.00001078787,0.036139034,0.000023151799,0.000017347995,0.00009637158,0.000015206055,0.00003469291,0.00086325424],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999147,0.000022195709,0.00023764669,0.00017579028,0.00010638276,0.00031099396],"domain_scores_gemma":[0.9996411,0.00010041817,0.00002819183,0.0001717293,0.000034123892,0.000024397246],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015122078,0.0001347515,0.00014529882,0.00023062277,0.000022080592,0.000023553008,0.00009063638,0.00012381423,0.000037955568],"category_scores_gemma":[0.00001773677,0.00014119502,0.000034462144,0.0007089655,0.000004484563,0.00008811718,0.000009111006,0.000099723475,0.0000088789775],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005705487,0.0005858893,0.0027187474,0.0005437353,0.00066706666,0.00008245838,0.00041329506,0.32855546,0.005431428,0.6073618,0.039135117,0.013934457],"study_design_scores_gemma":[0.0029184874,0.00012001056,0.057677306,0.00018978908,0.00007029346,0.0000135350965,0.00010139783,0.8459915,0.028848413,0.05810124,0.004828563,0.0011394585],"about_ca_topic_score_codex":0.000033376247,"about_ca_topic_score_gemma":0.000030635492,"teacher_disagreement_score":0.9234755,"about_ca_system_score_codex":0.00024185127,"about_ca_system_score_gemma":0.000006602988,"threshold_uncertainty_score":0.5757766},"labels":[],"label_agreement":null},{"id":"W2113369277","doi":"10.1109/tpwrs.2010.2045663","title":"Optimal Allocation of ESS in Distribution Systems With a High Penetration of Wind Energy","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":466,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Sizing; Installation; Energy storage; Distributed generation; Reliability engineering; Electricity; Computer science; Environmental economics; Renewable energy; Environmental science; Engineering; Electrical engineering; Power (physics); Economics","score_opus":0.003358343786777668,"score_gpt":0.17515674847098514,"score_spread":0.17179840468420748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113369277","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24430338,0.000077909746,0.75302655,0.0000051200495,0.0017614772,0.00036682174,0.000074233096,0.00009157395,0.0002929484],"genre_scores_gemma":[0.9995123,0.000018970699,0.00017755371,9.294419e-7,0.00001549701,0.00009831436,0.00004981226,0.0000431508,0.00008343215],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983683,0.00008541675,0.00071543123,0.0002285494,0.0003763655,0.00022594215],"domain_scores_gemma":[0.9990755,0.000070878385,0.00020043911,0.00037549037,0.0002159236,0.000061769715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027717187,0.00021725925,0.0003793951,0.00031968555,0.000037679612,0.000033863886,0.00014584756,0.00022813604,0.000009857367],"category_scores_gemma":[0.0000038858816,0.00021225047,0.00005020659,0.00072257506,0.000039539143,0.0002835596,5.122767e-7,0.00022588922,0.000003035911],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051365852,0.00011426731,0.00007721996,0.00020236995,0.000062755935,0.0000016146239,0.00019109232,0.97031486,0.027702324,0.0011900545,0.000032006883,0.000060064114],"study_design_scores_gemma":[0.0016963002,0.0006122477,0.00120486,0.000646664,0.00008773122,0.00008998542,0.00034187932,0.84197074,0.15252662,0.000003146141,0.00028768007,0.0005321313],"about_ca_topic_score_codex":0.0011274001,"about_ca_topic_score_gemma":0.00025822586,"teacher_disagreement_score":0.75520897,"about_ca_system_score_codex":0.0001489224,"about_ca_system_score_gemma":0.000064664884,"threshold_uncertainty_score":0.8655323},"labels":[],"label_agreement":null},{"id":"W2113553481","doi":"10.1002/etep.670","title":"Stochastic security-constrained joint market clearing for energy and reserves auctions considering uncertainties of wind power producers and unreliable equipment","year":2012,"lang":"en","type":"article","venue":"International Transactions on Electrical Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Clearing; Market clearing; Wind power; Stochastic programming; Common value auction; Electricity market; Mathematical optimization; Computer science; Reliability (semiconductor); Electric power system; Integer programming; Operations research; Reliability engineering; Power (physics); Electricity; Engineering; Economics; Microeconomics; Electrical engineering; Mathematics; Finance","score_opus":0.01183856559101399,"score_gpt":0.21262723805799968,"score_spread":0.2007886724669857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113553481","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007013521,0.0015306702,0.98667383,0.00013592152,0.0019480836,0.0002794818,0.000043908978,0.00017627394,0.002198277],"genre_scores_gemma":[0.9984605,0.00014932503,0.00053963513,0.000010455755,0.000102048434,0.00013331174,0.000009692444,0.000042519994,0.00055254163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985506,0.000060167928,0.0005012912,0.0002492366,0.00028067504,0.00035801454],"domain_scores_gemma":[0.99909514,0.00037903927,0.00009859176,0.0001434863,0.00015128059,0.00013243097],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029179075,0.00021245114,0.00029240552,0.00044776648,0.00011874202,0.00006372367,0.000090120324,0.00012010989,0.000024222887],"category_scores_gemma":[0.0000812135,0.00022195469,0.00006857659,0.00026892585,0.00006658924,0.00028720443,0.0000059778904,0.00012166695,3.0538482e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014621545,0.00015813997,0.000060645078,0.00015794647,0.000676792,0.0000010487099,0.00048553874,0.9786751,0.0016552001,0.015415683,0.0005340128,0.002033642],"study_design_scores_gemma":[0.00072444405,0.00019323848,0.00007703767,0.00020731981,0.000059401835,0.00011868811,0.00021386043,0.99201477,0.0033853801,0.00030880523,0.002386406,0.0003106677],"about_ca_topic_score_codex":0.00031170758,"about_ca_topic_score_gemma":0.000020293968,"teacher_disagreement_score":0.991447,"about_ca_system_score_codex":0.00025043584,"about_ca_system_score_gemma":0.000038378585,"threshold_uncertainty_score":0.90510494},"labels":[],"label_agreement":null},{"id":"W2114094150","doi":"10.5267/j.ijiec.2010.02.005","title":"A particle swarm approach to solve environmental/economic dispatch problem","year":2010,"lang":"en","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"Electric Power System Optimization","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Particle swarm optimization; Economic dispatch; Mathematical optimization; Computer science; Engineering; Mathematics; Physics; Electric power system","score_opus":0.01064840458373698,"score_gpt":0.2078199654378175,"score_spread":0.19717156085408052,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2114094150","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37618995,0.00003120313,0.61866623,0.000255913,0.0041064974,0.00019641823,0.000022542667,0.000100731675,0.00043048427],"genre_scores_gemma":[0.9669822,0.0000057480715,0.03203819,0.000014334914,0.00088733627,0.000012798284,0.000014057686,0.000033183303,0.000012182877],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989364,0.000007602259,0.00052064884,0.000102322316,0.0002615326,0.00017149044],"domain_scores_gemma":[0.999514,0.000077142664,0.00010518627,0.00009176285,0.00005967103,0.00015225139],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020632308,0.00013467224,0.00016404956,0.00024282675,0.000023355973,0.00009766591,0.000342213,0.000091122914,0.000020700845],"category_scores_gemma":[0.000053212494,0.00014499595,0.00007878272,0.00012402583,0.000010077985,0.00025294712,0.000030137131,0.00040405543,0.00003720394],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007653875,0.000045746718,0.0003424072,0.0000025621514,0.00012866019,0.000004000181,0.0002845646,0.9901145,0.005070559,0.00071106694,0.0007780076,0.0025102666],"study_design_scores_gemma":[0.0009856147,0.000060402857,0.00045154535,0.000042892963,0.000025376781,0.00019647808,0.000040334868,0.9891131,0.004629487,0.000057062607,0.004175508,0.00022221236],"about_ca_topic_score_codex":0.0000058259393,"about_ca_topic_score_gemma":0.0000017187747,"teacher_disagreement_score":0.5907922,"about_ca_system_score_codex":0.00024389774,"about_ca_system_score_gemma":0.000053603464,"threshold_uncertainty_score":0.59127635},"labels":[],"label_agreement":null},{"id":"W2114925916","doi":"10.1109/tpwrs.2007.907457","title":"Strategic Bidding for Price-Taker Hydroelectricity Producers","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"","keywords":"Bidding; Hydroelectricity; Electricity market; Electricity; Stochastic programming; Stochastic modelling; Stochastic process; Process (computing); Electricity generation; Electric power system; Operations research; Economics; Computer science; Industrial organization; Microeconomics; Mathematical optimization; Engineering; Power (physics); Finance; Mathematics; Electrical engineering","score_opus":0.016467329951924903,"score_gpt":0.2266777537310644,"score_spread":0.2102104237791395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2114925916","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01135493,0.0003477487,0.9715881,0.000017909173,0.004756186,0.0014228165,0.00002432001,0.0009253597,0.009562638],"genre_scores_gemma":[0.99832994,0.000023448867,0.00052654045,0.000020421488,0.00004888512,0.00019008193,0.0000051196917,0.00010816456,0.00074737926],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979662,0.000040600877,0.0005960905,0.00038758616,0.00032842177,0.00068115146],"domain_scores_gemma":[0.9990421,0.00018241363,0.00009424445,0.0003929419,0.0001323959,0.00015590007],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007623301,0.00031411438,0.00032755738,0.0005033272,0.00018480374,0.000101323814,0.00018789807,0.00021178309,0.000023835839],"category_scores_gemma":[0.000006785965,0.00032587707,0.00014295938,0.0009619304,0.00001730633,0.00023002215,3.3053786e-7,0.00027924904,0.00005979032],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000076051874,0.00012919672,0.000008696546,0.00032658086,0.00025326794,0.000008680733,0.000496162,0.9829137,0.013277673,0.00042731393,0.0014215128,0.00066120375],"study_design_scores_gemma":[0.0018483545,0.0007491422,0.000042473253,0.00028499585,0.00014924578,0.00016465153,0.00055153796,0.87131643,0.11338294,0.00005021396,0.010082757,0.0013772739],"about_ca_topic_score_codex":0.00002231736,"about_ca_topic_score_gemma":0.00001708978,"teacher_disagreement_score":0.986975,"about_ca_system_score_codex":0.0005115992,"about_ca_system_score_gemma":0.0000522334,"threshold_uncertainty_score":0.99991935},"labels":[],"label_agreement":null},{"id":"W2115304898","doi":"10.1109/psce.2009.4840058","title":"The effects of wind profile on thermal units generation costs","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Renewable energy; Power system simulation; Environmental science; Wind speed; Thermal power station; Electric power system; Electricity generation; Meteorology; Automotive engineering; Power (physics); Computer science; Marine engineering; Environmental economics; Engineering; Waste management; Electrical engineering","score_opus":0.004719399815469831,"score_gpt":0.18266876191103806,"score_spread":0.17794936209556822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2115304898","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8848699,0.0005578456,0.016246745,0.00008860234,0.0007033484,0.00076668116,0.0000010855589,0.00029019217,0.09647564],"genre_scores_gemma":[0.9992586,0.000019718465,0.0001306919,0.00002881047,0.000056821547,0.000004556625,0.0000058780047,0.000008168621,0.00048678793],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996301,0.00002769398,0.00009994166,0.000050716862,0.000094778625,0.00009678331],"domain_scores_gemma":[0.9997333,0.000070872826,0.000018101202,0.00012137129,0.000040193052,0.00001615814],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006913962,0.00005944673,0.000055055054,0.000027619855,0.00003737239,0.000014628147,0.000057829526,0.000034746256,0.0000059342137],"category_scores_gemma":[0.000044510536,0.000039924944,0.000010026148,0.00019368468,0.0000040255163,0.000046665107,0.0000019674803,0.000043332722,0.000013070191],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001715843,0.000048334525,0.00013595389,0.00006853249,0.00005691101,0.000003086596,0.00035998537,0.20925981,0.62570024,0.011323799,0.020733507,0.1322927],"study_design_scores_gemma":[0.00027796783,0.00026697497,0.0028061618,0.00003360469,0.000007265775,0.0000012801868,0.0000051329653,0.3237413,0.6723916,0.0000074411546,0.0003631175,0.00009815711],"about_ca_topic_score_codex":0.0000021151247,"about_ca_topic_score_gemma":0.0000025706206,"teacher_disagreement_score":0.13219453,"about_ca_system_score_codex":0.000041266314,"about_ca_system_score_gemma":0.000008912123,"threshold_uncertainty_score":0.1628092},"labels":[],"label_agreement":null},{"id":"W2116191552","doi":"10.1145/2208828.2208846","title":"The impact of electricity pricing schemes on storage adoption in Ontario","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"University of Waterloo; Government of Ontario","keywords":"Electricity; Electricity pricing; Environmental economics; Business; Computer science; Industrial organization; Electricity market; Economics; Electrical engineering; Engineering","score_opus":0.009586884105588899,"score_gpt":0.22180232859153717,"score_spread":0.21221544448594828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116191552","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95763284,0.00023615341,0.027254488,0.000002705148,0.0001056123,0.00015829087,1.7557315e-7,0.0000738773,0.014535838],"genre_scores_gemma":[0.99946564,0.000016851065,0.00027432016,0.000001982625,0.000018377366,0.00000631009,0.0000016213495,0.000011901408,0.00020299354],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.999397,0.000024036799,0.00017599015,0.000051602638,0.00010511868,0.0002462477],"domain_scores_gemma":[0.9997154,0.00006974764,0.000034001307,0.0001310947,0.000019560139,0.000030217965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028286417,0.00008408895,0.00009981709,0.00010076981,0.000025022466,0.000010736754,0.00006597034,0.00004691298,0.000024787638],"category_scores_gemma":[0.000028219525,0.000056401415,0.000037972786,0.00030046058,0.000004312659,0.00015072036,0.0000056555186,0.00014959734,0.000008251612],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004092407,0.00012247916,0.3230563,0.000024924297,0.000082404666,5.6811666e-7,0.0013193275,0.6589665,0.0089057805,0.0020333354,0.0009784674,0.0044690254],"study_design_scores_gemma":[0.00044211448,0.00019556828,0.71686226,0.00004947658,0.000009465109,0.000005096331,0.000033914435,0.26284763,0.018936679,0.000024838413,0.00034474346,0.00024820128],"about_ca_topic_score_codex":0.0074172197,"about_ca_topic_score_gemma":0.005589162,"teacher_disagreement_score":0.39611885,"about_ca_system_score_codex":0.0008745717,"about_ca_system_score_gemma":0.00003485421,"threshold_uncertainty_score":0.9991925},"labels":[],"label_agreement":null},{"id":"W2116212635","doi":"","title":"Integration of Wave and Tidal Power into the Haida Gwaii Electrical Grid","year":2009,"lang":"en","type":"dissertation","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Tidal power; Renewable energy; Marine energy; Engineering; Archipelago; Compressor station; Wave power; Environmental science; Marine engineering; Pipeline transport; Electrical engineering; Oceanography; Energy (signal processing); Environmental engineering; Geology","score_opus":0.004165579009522752,"score_gpt":0.20575901720953507,"score_spread":0.20159343820001233,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116212635","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48533258,0.015742186,0.11632672,0.00025669875,0.004842202,0.0029002985,0.000014725535,0.0013486571,0.3732359],"genre_scores_gemma":[0.9943029,0.00035710516,0.0014294925,0.000023432733,0.00009401182,0.000024510868,0.00038699596,0.00004995428,0.0033315385],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99894804,0.000038474755,0.00040443763,0.00018766976,0.00024383879,0.0001775164],"domain_scores_gemma":[0.9994605,0.00006825217,0.00009834939,0.0002094013,0.00012344614,0.00004006189],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014889051,0.00024154861,0.00028480974,0.00020279436,0.000046361278,0.00004429875,0.00011494118,0.00029816892,0.00003717317],"category_scores_gemma":[0.000059269136,0.00017473823,0.000062057254,0.00038924065,0.0000109612265,0.0001109708,0.000004864488,0.00031777786,0.000006924299],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003989391,0.00025842784,0.00015564919,0.0010648912,0.0009612315,0.000023701441,0.031912684,0.01010306,0.13054977,0.032889023,0.07283786,0.7188448],"study_design_scores_gemma":[0.0017125892,0.0014255714,0.022215812,0.00089428027,0.0005654332,0.000091837006,0.002432824,0.7415861,0.21558501,0.0027235153,0.00814094,0.0026261231],"about_ca_topic_score_codex":0.00008489866,"about_ca_topic_score_gemma":0.00044542155,"teacher_disagreement_score":0.731483,"about_ca_system_score_codex":0.00009785178,"about_ca_system_score_gemma":0.000040168656,"threshold_uncertainty_score":0.7125618},"labels":[],"label_agreement":null},{"id":"W2116385668","doi":"10.1109/ccece.2011.6030487","title":"Short-term coordination of hydro-thermal systems with cascaded reservoirs using bacterial foraging algorithm","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Foraging; Convergence (economics); Mathematical optimization; Computer science; Optimization problem; Term (time); Nonlinear system; Algorithm; Mathematics; Ecology","score_opus":0.021901769249127453,"score_gpt":0.21067961406677077,"score_spread":0.18877784481764331,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116385668","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5728305,0.000058436635,0.4218931,0.0000010904349,0.00041620297,0.0003534668,0.0000040105756,0.00020700398,0.0042362227],"genre_scores_gemma":[0.9828399,0.000002355965,0.016889991,8.4111673e-7,0.000091328344,0.000025796046,0.000014270545,0.000055330078,0.000080233855],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896365,0.000042924217,0.00035408227,0.00016028587,0.00020227645,0.00027676366],"domain_scores_gemma":[0.9995363,0.000017330363,0.00006841661,0.00021537067,0.000102569604,0.000060055638],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020762211,0.00016410332,0.00024081315,0.00018123623,0.00004071725,0.000031623742,0.00012958334,0.00009589672,0.00002616585],"category_scores_gemma":[0.000005386394,0.00014768174,0.000030555264,0.00030519464,0.00001943947,0.00037993462,0.000018105771,0.00008033259,0.0000020074976],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000254272,0.00022797757,0.028038107,0.001678209,0.0011272319,0.00012526964,0.0070861164,0.73276967,0.20245922,0.00074082374,0.00040480393,0.02508827],"study_design_scores_gemma":[0.00038531632,0.000054038832,0.0014492992,0.00010435406,0.000041865467,0.000056826957,0.000094431845,0.9698536,0.027720159,0.0000017628579,0.00001580334,0.00022253559],"about_ca_topic_score_codex":0.00021277994,"about_ca_topic_score_gemma":0.000011508943,"teacher_disagreement_score":0.41000938,"about_ca_system_score_codex":0.00013881446,"about_ca_system_score_gemma":0.000019508834,"threshold_uncertainty_score":0.60222864},"labels":[],"label_agreement":null},{"id":"W2116988740","doi":"10.1109/tpwrs.2009.2038783","title":"Long-Term Effects of Feed-In Tariffs and Carbon Taxes on Distribution Systems","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":64,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Renewable energy; Environmental economics; Investment (military); Context (archaeology); Electricity; Term (time); Distribution (mathematics); Carbon tax; Economics; Distributed generation; Feed-in tariff; Production (economics); Industrial organization; Emissions trading; Electricity generation; Microeconomics; Natural resource economics; Operations research; Energy policy; Power (physics); Engineering; Greenhouse gas; Electrical engineering; Mathematics","score_opus":0.003070718246184033,"score_gpt":0.18505268739152445,"score_spread":0.1819819691453404,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116988740","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5601479,0.00047403265,0.4294039,0.00000653969,0.008151134,0.0010006257,0.000073518466,0.00024364617,0.00049870304],"genre_scores_gemma":[0.99948937,0.000052434072,0.000009736822,0.0000021754104,0.000023430157,0.00018928298,0.000010991393,0.000056581695,0.0001659921],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99844223,0.00008183263,0.00053390954,0.00030345755,0.00031101357,0.00032757554],"domain_scores_gemma":[0.9991074,0.00019939238,0.0001064251,0.0004137633,0.00006417222,0.00010885325],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00024414863,0.00029308125,0.00044063723,0.00032135096,0.000055983965,0.0000652475,0.00013328656,0.0002984608,0.0000029515352],"category_scores_gemma":[0.000010498058,0.00029396694,0.00006589181,0.00042778888,0.00003679884,0.00013066869,8.3640646e-7,0.00045904555,0.000009018997],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024170427,0.00081927446,0.005195943,0.0068001277,0.0005308756,0.00011025754,0.0016159199,0.84159327,0.1405265,0.0012115072,0.000411189,0.000943435],"study_design_scores_gemma":[0.0059568123,0.0018611208,0.023012368,0.0055087493,0.00032833478,0.00041855883,0.00021184648,0.65300184,0.30691,0.000008710663,0.0004871577,0.0022944896],"about_ca_topic_score_codex":0.00041215628,"about_ca_topic_score_gemma":0.00014843277,"teacher_disagreement_score":0.4393415,"about_ca_system_score_codex":0.00017160599,"about_ca_system_score_gemma":0.000022864158,"threshold_uncertainty_score":0.99995124},"labels":[],"label_agreement":null},{"id":"W2117181535","doi":"10.1109/tpwrs.2004.825823","title":"Assessment of Transmission Congestion Cost and Locational Marginal Pricing in a Competitive Electricity Market","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":84,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Computer science; Electricity market; Transmission (telecommunications); Electric power transmission; Reliability (semiconductor); Transmission system; Marginal cost; Transmission network; Network topology; Power system simulation; Electric power system; Reliability engineering; Electricity; Network congestion; Computer network; Engineering; Power (physics); Telecommunications; Economics; Electrical engineering","score_opus":0.00631179647743849,"score_gpt":0.2235933090035715,"score_spread":0.217281512526133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2117181535","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019624906,0.0002354749,0.97439873,0.000032397253,0.00046486175,0.0007522459,0.000021165184,0.00011031082,0.0043599335],"genre_scores_gemma":[0.99862754,0.00013184918,0.0010287489,0.000006556048,0.0000053102394,0.000108869026,0.000005037226,0.000028527002,0.000057569043],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986868,0.00009792534,0.00046318394,0.00022375709,0.0002985054,0.00022984634],"domain_scores_gemma":[0.9995023,0.000111097834,0.00007571428,0.00013947664,0.00009406926,0.000077329976],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034378987,0.00018724064,0.0002907671,0.00041917118,0.000058276422,0.000028342723,0.00007382094,0.00012265434,0.00002502855],"category_scores_gemma":[0.0000028223085,0.00019971005,0.000041633586,0.00057293527,0.000029163228,0.00018202646,4.1009787e-7,0.0002550503,0.0000021843352],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039551727,0.00016518382,0.00025535625,0.0002484846,0.000055773355,0.0000057351126,0.00032355232,0.9915936,0.005440771,0.001239625,0.000019495832,0.0006128909],"study_design_scores_gemma":[0.004434438,0.000584898,0.037401192,0.001999273,0.00008155414,0.00019677012,0.00035755805,0.93970597,0.013952816,0.000042863376,0.0005390049,0.00070368015],"about_ca_topic_score_codex":0.0001174637,"about_ca_topic_score_gemma":0.00003135475,"teacher_disagreement_score":0.97900265,"about_ca_system_score_codex":0.0005718202,"about_ca_system_score_gemma":0.000099869634,"threshold_uncertainty_score":0.81439394},"labels":[],"label_agreement":null},{"id":"W2117858766","doi":"10.1109/pes.2006.1708872","title":"Line impact cost concept to calculate congestion costs in deregulated electricity market","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Electricity; Line (geometry); Network congestion; Computer science; Schedule; Reliability engineering; Operations research; Computer network; Engineering; Electrical engineering; Mathematics","score_opus":0.0036012330662299114,"score_gpt":0.21029790073907406,"score_spread":0.20669666767284414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2117858766","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.804305,0.0011417211,0.19050679,0.000053092193,0.00091358495,0.00086715753,0.00004035055,0.0010851463,0.0010871498],"genre_scores_gemma":[0.99050355,0.000031997442,0.008546696,0.00005330574,0.000313671,0.00007218041,0.00007152089,0.0001503354,0.00025672323],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974678,0.00006731221,0.00068903656,0.00042685296,0.00033906222,0.0010099255],"domain_scores_gemma":[0.9991969,0.000122063335,0.000082547864,0.0002842627,0.0001300691,0.00018416593],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00059699,0.0004942436,0.00046827272,0.00022101589,0.0000737493,0.00009744538,0.00020599901,0.00031447754,0.000032344942],"category_scores_gemma":[0.00008142403,0.0005600385,0.00021617988,0.0015194701,0.000015428606,0.00020313163,0.000024645944,0.00041550677,0.000015237196],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007904613,0.000023528011,0.001114949,0.00003263911,0.000052352614,0.000007439053,0.00013010968,0.9081771,0.07788455,0.000015604077,0.012263877,0.00028997276],"study_design_scores_gemma":[0.0006932519,0.000048766495,0.008664128,0.00017323182,0.000019938598,0.000019723542,0.0000079680285,0.9589787,0.030338645,0.0000028305521,0.0004360474,0.00061678176],"about_ca_topic_score_codex":0.0007091783,"about_ca_topic_score_gemma":0.00006537714,"teacher_disagreement_score":0.18619855,"about_ca_system_score_codex":0.001580946,"about_ca_system_score_gemma":0.00004253589,"threshold_uncertainty_score":0.9996851},"labels":[],"label_agreement":null},{"id":"W2118094951","doi":"10.1109/tec.2004.827043","title":"Accounting for Losses in the Optimization of Production of Hydroplants","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Conversion","topic":"Electric Power System Optimization","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; Hydro-Québec; HEC Montréal","funders":"","keywords":"Dynamic programming; Variable (mathematics); Mathematical optimization; Unit (ring theory); Production (economics); Computer science; Optimization problem; Head (geology); Mathematics; Economics","score_opus":0.007282511942764788,"score_gpt":0.19282638136688013,"score_spread":0.18554386942411533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2118094951","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05995355,0.00003990438,0.9390329,0.000039015722,0.00059961015,0.0001707227,0.000004752744,0.000042985415,0.00011656263],"genre_scores_gemma":[0.99786764,0.00015209107,0.0018836316,0.000009402876,0.000017980856,0.00002692424,0.000008000501,0.000015354562,0.00001894892],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999395,0.000021425925,0.000237362,0.00010617483,0.00013765982,0.000102380975],"domain_scores_gemma":[0.99966633,0.00005424347,0.00006699307,0.0001376959,0.00006443601,0.000010294974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013980742,0.00008411744,0.00011680455,0.00022146286,0.000041690782,0.000005073046,0.00008724274,0.00006679004,0.000004996904],"category_scores_gemma":[0.000006124516,0.00007511127,0.000045257868,0.00041700812,0.0000183899,0.00017252054,2.5401573e-7,0.000053725435,5.0577063e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029577015,0.00005739623,0.0000065195545,0.000088973284,0.0000135729015,2.2009525e-7,0.00023457692,0.9926828,0.0058855717,0.00004777805,0.00001997197,0.00093304436],"study_design_scores_gemma":[0.0006999915,0.00009809508,0.000016732482,0.00015536563,0.000027885668,0.000006638057,0.00012809628,0.40379736,0.5948857,0.00003182394,0.000054970893,0.000097346674],"about_ca_topic_score_codex":0.00007728495,"about_ca_topic_score_gemma":0.000031262087,"teacher_disagreement_score":0.93791413,"about_ca_system_score_codex":0.00007804934,"about_ca_system_score_gemma":0.000022370432,"threshold_uncertainty_score":0.30629486},"labels":[],"label_agreement":null},{"id":"W2119471982","doi":"10.1109/pes.2004.1373027","title":"Coordinated spot market for congestion management of inter-regional electricity markets","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; University of Waterloo","funders":"","keywords":"Congestion management; Electricity market; Electricity; Spot market; Forward contract; Spot contract; Industrial organization; Power market; Point (geometry); Electric power system; Electricity system; Computer science; Business; Electricity generation; Power (physics); Engineering; Finance; Electrical engineering","score_opus":0.00604614523891169,"score_gpt":0.20349858922293274,"score_spread":0.19745244398402104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2119471982","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13992977,0.0013477026,0.8542894,0.0000831235,0.0014884965,0.0008134924,0.000026327187,0.00075372733,0.0012679392],"genre_scores_gemma":[0.9370272,0.00020173844,0.061694562,0.000040338786,0.00013927267,0.00014283278,0.000036936035,0.00012915292,0.00058797444],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982249,0.000023478924,0.0005456381,0.00034636838,0.0002643538,0.0005952547],"domain_scores_gemma":[0.9992618,0.000071139366,0.00012286931,0.00027543766,0.00015616577,0.00011259278],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000572087,0.0003751012,0.0003682303,0.00012506219,0.000060810846,0.00003411454,0.00025754736,0.00021733498,0.000022140235],"category_scores_gemma":[0.00002839646,0.00043660376,0.00028576268,0.00058643805,0.000026340686,0.00014266359,0.000021317108,0.00020810484,0.0000041885573],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036231115,0.000062693725,0.000054873675,0.0006260533,0.00048174683,0.000004613549,0.00022726439,0.9470133,0.023762655,0.00038536979,0.026833704,0.00051144906],"study_design_scores_gemma":[0.0033801128,0.00020362108,0.0010911961,0.00091460353,0.0001849602,0.00004498656,0.000056928016,0.9099116,0.07496804,0.00010108575,0.008008096,0.001134806],"about_ca_topic_score_codex":0.000017816361,"about_ca_topic_score_gemma":0.0000014765523,"teacher_disagreement_score":0.79709744,"about_ca_system_score_codex":0.0005450573,"about_ca_system_score_gemma":0.000030472338,"threshold_uncertainty_score":0.99980855},"labels":[],"label_agreement":null},{"id":"W2119673178","doi":"10.1177/1035304615574973","title":"The privatisation of Australian electricity: Claims, myths and facts","year":2015,"lang":"en","type":"article","venue":"The Economic and Labour Relations Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Australian Government","keywords":"Liberalization; Government (linguistics); Electricity; Quarter (Canadian coin); Market economy; Investment (military); Business; Economics; Project commissioning; Private sector; Mythology; Value (mathematics); Finance; Commerce; Publishing; Economic growth; Politics; Law; Engineering","score_opus":0.016428095138306547,"score_gpt":0.22981892461498896,"score_spread":0.21339082947668242,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2119673178","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31275892,0.6280722,0.013553546,0.013672449,0.00072460755,0.0033746266,0.000040324892,0.00029950947,0.027503816],"genre_scores_gemma":[0.9393855,0.058418244,0.00018522648,0.000051600935,0.00002900516,0.000021813872,0.0000071640484,0.000012702447,0.0018887575],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99949163,0.00005724817,0.00026046354,0.000065121305,0.000036315494,0.000089229055],"domain_scores_gemma":[0.9996038,0.00010430117,0.000084066116,0.00014832274,0.000023101484,0.000036378646],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047259327,0.00006867527,0.00013449152,0.000024030065,0.00008276526,0.00002466554,0.00006709112,0.000032490963,0.00001681254],"category_scores_gemma":[0.00004993111,0.000044578363,0.000015124696,0.00010387479,0.00002828582,0.00010756447,0.000010961396,0.000077583936,0.00003073936],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019705863,0.000023918921,0.010233611,0.002803562,0.0006283452,9.452713e-7,0.0029702033,0.09482525,0.00009990854,0.45144674,0.17973246,0.25721535],"study_design_scores_gemma":[0.00073182344,0.00009361529,0.018201321,0.00095852645,0.00026066625,0.000075230695,0.00014937067,0.11261179,0.0001390884,0.008131174,0.8582089,0.0004385068],"about_ca_topic_score_codex":0.000015739935,"about_ca_topic_score_gemma":0.000012058282,"teacher_disagreement_score":0.67847645,"about_ca_system_score_codex":0.000077991135,"about_ca_system_score_gemma":0.000036422767,"threshold_uncertainty_score":0.18178529},"labels":[],"label_agreement":null},{"id":"W2119993630","doi":"10.1109/eem.2012.6254753","title":"Fast computation of equilibrium market outcomes considering tacit collusion","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Tacit collusion; Collusion; Bidding; Computer science; Microeconomics; Game theory; Industrial organization; Electricity market; Electricity; Mathematical optimization; Economics; Mathematics; Engineering","score_opus":0.00969238638884459,"score_gpt":0.2178872437483683,"score_spread":0.2081948573595237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2119993630","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3173147,0.0003152756,0.61006916,0.00003464919,0.00092826784,0.0002998297,0.000004202789,0.0005013136,0.070532575],"genre_scores_gemma":[0.99178123,0.0000045773168,0.0075623943,0.000013685731,0.000025284366,0.000005080886,0.000004739098,0.000022331567,0.00058065803],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993164,0.000024469824,0.00025740458,0.0000640962,0.00013658054,0.00020108174],"domain_scores_gemma":[0.99969286,0.000072220995,0.00004332918,0.00009854914,0.000039178045,0.000053850003],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016868679,0.00009817232,0.00017073336,0.00010133759,0.000015580634,0.000011698622,0.000047858073,0.00005289721,0.00012121412],"category_scores_gemma":[0.00002985857,0.00009417259,0.000032906733,0.00019287672,0.000009725002,0.0002667933,0.000024516079,0.0000422558,0.000017000608],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023878243,0.00013245446,0.26003364,0.00085704273,0.00026236277,0.0000027544288,0.0018199004,0.64756596,0.05852318,0.0018184251,0.02191674,0.00704369],"study_design_scores_gemma":[0.00053875666,0.00002634563,0.03395123,0.000057975863,0.000025202666,0.00001639812,0.000096938216,0.9417474,0.022792546,0.00003207672,0.00043358884,0.00028150063],"about_ca_topic_score_codex":0.00000851414,"about_ca_topic_score_gemma":0.000002383518,"teacher_disagreement_score":0.67446655,"about_ca_system_score_codex":0.000055374534,"about_ca_system_score_gemma":0.000007725292,"threshold_uncertainty_score":0.38402468},"labels":[],"label_agreement":null},{"id":"W2120835375","doi":"10.1109/pes.2007.385565","title":"Investigation of Transmission Cost Allocation Using a Power Flow Tracing Method","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Tracing; Computer science; Transmission (telecommunications); Scheme (mathematics); Cost allocation; Power flow; Mathematical optimization; Power (physics); Electric power system; Telecommunications; Economics","score_opus":0.012864463807926966,"score_gpt":0.24018716476842278,"score_spread":0.2273227009604958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2120835375","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2706519,0.00044887993,0.7273381,0.00001238925,0.00072014105,0.0002745188,0.0000027825572,0.0003872828,0.00016403089],"genre_scores_gemma":[0.6000036,0.000018885761,0.39974517,0.000019145979,0.00010221001,0.000008209604,0.000009599399,0.00008362602,0.000009559357],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978878,0.00005222967,0.0007797939,0.0003103793,0.0004030776,0.0005667433],"domain_scores_gemma":[0.9991135,0.00017702325,0.00014318312,0.0002413513,0.00015736037,0.00016760673],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0019090027,0.00033722506,0.00035597838,0.0001765741,0.000094017145,0.000039030143,0.00016588252,0.000277744,0.00000930556],"category_scores_gemma":[0.00005249183,0.00039132987,0.00021951529,0.000843365,0.000018998671,0.00031430039,0.000012164221,0.00030958213,0.0000017717609],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000024198255,0.000003459879,0.000065613865,0.00010639045,0.000044065608,7.864072e-7,0.0017802862,0.54323334,0.45373368,0.00001145356,0.0000636569,0.0009548704],"study_design_scores_gemma":[0.00021764457,0.000016145501,0.00013098982,0.0002221333,0.000028370563,0.000013021456,0.00008807932,0.65880257,0.34012416,0.000004462535,0.00009642608,0.00025600774],"about_ca_topic_score_codex":0.000034188346,"about_ca_topic_score_gemma":0.0000017551613,"teacher_disagreement_score":0.3293517,"about_ca_system_score_codex":0.00038180925,"about_ca_system_score_gemma":0.00004169752,"threshold_uncertainty_score":0.99985385},"labels":[],"label_agreement":null},{"id":"W2121608062","doi":"10.1109/pesmg.2013.6672443","title":"Security-constrained unit commitment with uncertain wind generation: The loadability set approach","year":2013,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Mathematical optimization; Set (abstract data type); Economic dispatch; Electric power system; Software deployment; Computer science; Wind power; Reliability (semiconductor); Power (physics); Engineering; Mathematics","score_opus":0.018346238992647482,"score_gpt":0.20404297002092156,"score_spread":0.18569673102827408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2121608062","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3025274,0.00028298565,0.5470086,0.0013215119,0.00027704902,0.003290391,0.000015728343,0.0009241837,0.14435215],"genre_scores_gemma":[0.99554956,0.0000037543148,0.0037663586,0.00008921836,0.00007200024,0.00010307945,0.0000634261,0.00001899183,0.0003335881],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99917233,0.00008436576,0.00019608757,0.00015941738,0.00018073288,0.00020705436],"domain_scores_gemma":[0.9994169,0.000046472018,0.000025662448,0.0003705983,0.000083028026,0.00005732436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021773725,0.00015129778,0.0001276107,0.000033047374,0.00009671401,0.000095918585,0.00014970746,0.00005948504,0.00027563144],"category_scores_gemma":[0.000008192907,0.000091581795,0.000022388667,0.0002968603,0.000051510975,0.00016178738,0.000013768722,0.00013215982,0.000038303806],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004974379,0.00007791983,0.0031331903,0.00009703172,0.00017983989,0.0000015059082,0.0017191615,0.96933866,0.00047202132,0.00464398,0.019236753,0.0010949491],"study_design_scores_gemma":[0.0003187968,0.000044450757,0.00038264706,0.00000515361,0.0000150719925,0.000021985406,0.00039783705,0.99655473,0.0008649237,0.00009934364,0.0011142187,0.00018084933],"about_ca_topic_score_codex":0.00012243075,"about_ca_topic_score_gemma":0.000056411995,"teacher_disagreement_score":0.6930222,"about_ca_system_score_codex":0.00008582616,"about_ca_system_score_gemma":0.00003187627,"threshold_uncertainty_score":0.37345973},"labels":[],"label_agreement":null},{"id":"W2122051472","doi":"10.5267/j.ijiec.2011.08.0013","title":"Energy market and reserve market modeling in simultaneous and serial implementation methods with the aim of reducing electricity costs","year":2011,"lang":"en","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity market; Electricity; Environmental economics; Economics; Business; Natural resource economics; Industrial organization; Microeconomics; Computer science; Engineering; Electrical engineering","score_opus":0.02610183908415872,"score_gpt":0.27454089517092556,"score_spread":0.24843905608676684,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122051472","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21969627,0.00020293749,0.7792807,0.00006227892,0.00044726752,0.00011181644,0.000006813541,0.000020604744,0.00017125918],"genre_scores_gemma":[0.9807444,0.00007426576,0.01900216,0.000004649575,0.00014339502,0.0000045814054,0.000003393991,0.000019639381,0.0000035184223],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989336,0.00010012344,0.0005210203,0.00009108671,0.00022584021,0.00012832093],"domain_scores_gemma":[0.9988793,0.00055621756,0.00018034963,0.000057641235,0.00027878705,0.000047686724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000646186,0.000119393604,0.00019020011,0.000408307,0.000024884072,0.00004013208,0.0001586798,0.00006885237,0.000013382785],"category_scores_gemma":[0.000199292,0.000101560945,0.000026662443,0.00030350368,0.000015203495,0.00019004474,0.000025994537,0.00022685117,2.5376012e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013228945,0.000010979385,0.00018571444,0.0000072231896,0.00014975671,0.000011787384,0.00048314157,0.9828883,0.0005010511,0.00014936565,0.00007279026,0.015407598],"study_design_scores_gemma":[0.0010706275,0.00009999905,0.00012818401,0.00012680973,0.000027907303,0.0001126768,0.000139571,0.9969262,0.001198693,0.000047694837,0.00002839128,0.000093231094],"about_ca_topic_score_codex":0.00034264725,"about_ca_topic_score_gemma":0.00004370421,"teacher_disagreement_score":0.76104814,"about_ca_system_score_codex":0.00016195557,"about_ca_system_score_gemma":0.00006269947,"threshold_uncertainty_score":0.41415352},"labels":[],"label_agreement":null},{"id":"W2122492517","doi":"10.1109/pes.2007.386176","title":"Analysis of Network Rental in the Competitive Electricity Market","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Natural Sciences and Engineering Research Council of Canada; Manitoba Hydro","keywords":"Renting; Karush–Kuhn–Tucker conditions; Electricity; Electricity market; Revenue; Constraint (computer-aided design); Electricity generation; Computer science; Mathematical optimization; Microeconomics; Business; Operations research; Industrial organization; Power (physics); Economics; Engineering; Finance; Mathematics","score_opus":0.003938496507501248,"score_gpt":0.19923848082025267,"score_spread":0.19529998431275142,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122492517","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.686908,0.0010864319,0.30295202,0.000016633938,0.0007873824,0.000286823,0.000007743463,0.00027497314,0.0076799663],"genre_scores_gemma":[0.9915757,0.00005858198,0.008063796,0.00004418298,0.00017232809,0.000011034378,0.000011507955,0.00003884948,0.000023974835],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99830794,0.000057734465,0.0005302507,0.00020325676,0.0003194679,0.0005813302],"domain_scores_gemma":[0.9991887,0.00039675098,0.00008394092,0.00022892666,0.00005370276,0.00004792814],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021366656,0.00022165081,0.0003672275,0.00018720057,0.000049092756,0.000026067037,0.0002544413,0.00012941618,0.000012796883],"category_scores_gemma":[0.00004887941,0.00021012865,0.00029200318,0.0032716105,0.000016825441,0.000083087,0.00001553998,0.00031482938,9.2659144e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000039963447,0.000015215714,0.005438211,0.000030986543,0.00044779445,0.0000034969805,0.0011711661,0.98291373,0.008686111,0.00015288327,0.0010558588,0.00008053792],"study_design_scores_gemma":[0.00017798362,0.000020311281,0.02031112,0.00005299202,0.00015060637,0.000004261629,0.00014667264,0.97462654,0.0039397106,0.000002528843,0.00032128982,0.00024595667],"about_ca_topic_score_codex":0.000038616236,"about_ca_topic_score_gemma":0.000037898666,"teacher_disagreement_score":0.30466774,"about_ca_system_score_codex":0.00021612871,"about_ca_system_score_gemma":0.00001126889,"threshold_uncertainty_score":0.8568798},"labels":[],"label_agreement":null},{"id":"W2122597238","doi":"10.1109/tpwrs.2009.2036264","title":"A Stochastic Programming Model for a Day-Ahead Electricity Market With Real-Time Reserve Shortage Pricing","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Mathematical optimization; Electricity pricing; Electricity; Scheduling (production processes); Electricity market; Computation; Computer science; Power system simulation; Economic shortage; Integer programming; Stochastic programming; Heuristic; Time limit; Electric power system; Limit (mathematics); Operations research; Economics; Power (physics); Engineering; Mathematics; Algorithm","score_opus":0.007904079102977066,"score_gpt":0.21270874033599127,"score_spread":0.20480466123301422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122597238","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010645669,0.000043582346,0.9825746,0.0000119154765,0.001096745,0.0025833813,0.00006355657,0.0011139789,0.0018666085],"genre_scores_gemma":[0.9904106,0.000006781488,0.005611851,0.000005696955,0.00003325552,0.0012195262,0.000009574317,0.0001730611,0.002529628],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977071,0.0000730639,0.0005341502,0.0004981046,0.0004439644,0.0007436043],"domain_scores_gemma":[0.9985533,0.00027414193,0.00011967442,0.00063655095,0.00021532188,0.00020105737],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007281311,0.00042537219,0.00049294205,0.00045003276,0.0002463261,0.00016082895,0.00027965882,0.00027603828,0.00001858952],"category_scores_gemma":[0.000018114082,0.00040222317,0.00013476903,0.0007986344,0.000031612286,0.00033577115,0.0000010536444,0.0005526191,0.000014106345],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012503518,0.000106235246,0.00000585085,0.00021733764,0.00017540787,0.000004889369,0.00057296566,0.9866206,0.01085163,0.000038864782,0.0008177311,0.0004634572],"study_design_scores_gemma":[0.0006681383,0.0002566216,0.000005212237,0.000208835,0.000099204044,0.00006142332,0.00003364085,0.9965743,0.0014257547,0.0000037314492,0.00020654268,0.00045663625],"about_ca_topic_score_codex":0.00011964657,"about_ca_topic_score_gemma":0.00024139753,"teacher_disagreement_score":0.97976494,"about_ca_system_score_codex":0.00025832272,"about_ca_system_score_gemma":0.00011100826,"threshold_uncertainty_score":0.99984294},"labels":[],"label_agreement":null},{"id":"W2122940896","doi":"","title":"Market Power in the Wholesale Electricity Spot Market in Alberta, Canada","year":2003,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity market; Restructuring; Market power; Electricity; Spot market; Electricity retailing; Wholesale market; Business; Competition (biology); Spot contract; Electric power industry; Industrial organization; Market economy; Factor market; Commerce; Economics; Finance; Engineering; Electrical engineering","score_opus":0.002661747326040394,"score_gpt":0.16210992224137422,"score_spread":0.15944817491533383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122940896","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.093327306,0.00028448034,0.0038752356,0.00023220309,0.00028353883,0.00042674542,0.0000019853214,0.00005383163,0.90151465],"genre_scores_gemma":[0.9943258,0.000024368233,0.00015017833,0.00021215451,0.000007509838,0.00002700888,0.0000020806426,0.000022517168,0.0052283574],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987991,0.00018135238,0.00027093102,0.00015373349,0.00020749297,0.0003874199],"domain_scores_gemma":[0.9994157,0.00026559702,0.000020286454,0.00024608793,0.000014942324,0.000037400365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000555993,0.00014570833,0.00015559443,0.00013036713,0.000019842677,0.00002597596,0.00018796833,0.00006882906,0.0007088504],"category_scores_gemma":[0.0001375407,0.00011987395,0.000019647607,0.00096167455,0.0000051871907,0.0000896474,0.000005419393,0.00020338685,0.0000070994247],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003924151,0.000142157,0.09789176,0.00010884421,0.000051892563,0.00015586804,0.000930292,0.056367714,0.00015739907,0.004496466,0.83894783,0.0007105269],"study_design_scores_gemma":[0.0028476887,0.00009602335,0.25785425,0.00013269875,0.000021106172,0.00021203813,0.0006834156,0.52415055,0.002829052,0.00029120655,0.20915008,0.001731877],"about_ca_topic_score_codex":0.35503894,"about_ca_topic_score_gemma":0.9267941,"teacher_disagreement_score":0.90099853,"about_ca_system_score_codex":0.00039625546,"about_ca_system_score_gemma":0.00015431595,"threshold_uncertainty_score":0.77614146},"labels":[],"label_agreement":null},{"id":"W2124055265","doi":"10.1109/naps.2008.5307337","title":"Mathematical modeling and simulation of the impact of system's constraints on IPP's bidding strategies","year":2008,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Cournot competition; Bidding; Price elasticity of demand; Mathematical optimization; Computer science; Elasticity (physics); Simulation software; Software; Software package; Economics; Mathematical economics; Microeconomics; Mathematics","score_opus":0.018674553485942585,"score_gpt":0.2480584446034974,"score_spread":0.22938389111755483,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124055265","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6051473,0.00002766179,0.37767303,6.3920317e-7,0.00001849465,0.00013816933,0.0000017018463,0.0000526772,0.01694032],"genre_scores_gemma":[0.999454,0.000003517159,0.0005126637,2.6803372e-7,0.000006674223,0.0000017442469,5.526323e-7,0.000010056208,0.00001052382],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999468,0.00002029297,0.0002615679,0.00005478054,0.000116135896,0.00007918176],"domain_scores_gemma":[0.99969655,0.00008754112,0.000046981582,0.000109704626,0.000041835097,0.000017355109],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000100108926,0.00007526512,0.00018079205,0.000059424725,0.000023783912,0.0000073289984,0.00004457622,0.00004346285,0.000022463442],"category_scores_gemma":[0.000022349586,0.00004696053,0.0000485001,0.000119967546,0.000029612793,0.000085103406,0.000006708122,0.00004247756,0.0000015119027],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000037660648,0.0000053167496,0.000063320236,0.00014347736,0.000027037771,2.2871752e-7,0.00019279575,0.9969989,0.00067840575,0.0017954478,0.0000021182755,0.00008915707],"study_design_scores_gemma":[0.00014164971,0.000026648897,0.000111284986,0.00018437968,0.000007118925,0.000014294964,0.00015692497,0.9986383,0.0006195966,0.00005681392,2.5830875e-8,0.000043015894],"about_ca_topic_score_codex":0.000010440282,"about_ca_topic_score_gemma":3.183532e-7,"teacher_disagreement_score":0.3943067,"about_ca_system_score_codex":0.00004587704,"about_ca_system_score_gemma":0.000023829138,"threshold_uncertainty_score":0.19149947},"labels":[],"label_agreement":null},{"id":"W2124928332","doi":"10.1109/ccece.2007.326","title":"The Investor's Dilemma: Generation or Transmission Expansion?","year":2007,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Consejo Nacional de Ciencia y Tecnología","keywords":"Dilemma; Reactance; Investment (military); Electric power transmission; Electricity market; Transmission (telecommunications); Incentive; Power transmission; Transmission line; Electricity; Economics; Industrial organization; Work (physics); Business; Microeconomics; Computer science; Power (physics); Telecommunications; Engineering; Electrical engineering; Voltage; Mathematics; Mechanical engineering","score_opus":0.01490662129200323,"score_gpt":0.22283180901917632,"score_spread":0.20792518772717308,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124928332","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029128797,0.0004185059,0.9609533,0.000109110144,0.00054918963,0.00019064885,2.1733506e-7,0.00039829267,0.008251929],"genre_scores_gemma":[0.9918198,0.00015804324,0.005372075,0.00005570181,0.00020370963,0.000011090497,0.0000074233544,0.000027736092,0.0023444004],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993576,0.000017054175,0.00020650223,0.00008676516,0.00014333629,0.00018876944],"domain_scores_gemma":[0.99967754,0.000068842135,0.000014654207,0.00014498414,0.000033032196,0.000060954466],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034622053,0.0000838538,0.00006018105,0.000045511257,0.00013233715,0.000040806688,0.00008191458,0.00006169981,0.000050655093],"category_scores_gemma":[0.000019017261,0.00004837003,0.000020791205,0.00023527368,0.000008612405,0.00012186342,0.0000039074325,0.00006649166,0.000024374223],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008102136,0.00005341241,0.00029403812,0.00007900598,0.000085937754,0.000026894557,0.0014304846,0.18477093,0.23620786,0.008654521,0.15381664,0.41449928],"study_design_scores_gemma":[0.0003510665,0.000057297442,0.00041692433,0.000015781172,0.000010644534,0.000020561076,0.00005005951,0.7415852,0.09190169,0.000039451003,0.16532125,0.00023005951],"about_ca_topic_score_codex":0.0000100102325,"about_ca_topic_score_gemma":0.00009859432,"teacher_disagreement_score":0.962691,"about_ca_system_score_codex":0.00006677655,"about_ca_system_score_gemma":0.000016862612,"threshold_uncertainty_score":0.19724727},"labels":[],"label_agreement":null},{"id":"W2124937476","doi":"10.1109/tpwrs.2007.901482","title":"Generalized Estimation of Average Displaced Emissions by Wind Generation","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Renewable energy; Wind power; Environmental economics; Electricity generation; Electric power system; Greenhouse gas; Work (physics); Estimation; Engineering; Environmental science; Computer science; Power (physics); Economics; Systems engineering; Electrical engineering","score_opus":0.008066432887448313,"score_gpt":0.22102131133006067,"score_spread":0.21295487844261235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124937476","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.059364274,0.00026821723,0.93523216,0.000011569272,0.0027223022,0.0005143695,0.00006130916,0.00030628667,0.00151951],"genre_scores_gemma":[0.9977625,0.000025229996,0.00074499985,0.000010542376,0.000022030388,0.00002972325,0.000036898262,0.00006224652,0.0013058464],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99833053,0.00007391432,0.00069819775,0.00023278614,0.0003658137,0.0002987742],"domain_scores_gemma":[0.99923104,0.00008026979,0.00011947501,0.0003497202,0.000087950364,0.00013156289],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00041182849,0.00023823616,0.00029638584,0.00029627947,0.00012196467,0.000044508342,0.00012302458,0.00020743784,0.00006129167],"category_scores_gemma":[0.0000066477955,0.00024524552,0.00009496639,0.0005021745,0.000019105015,0.0002435373,4.6830246e-7,0.00017623788,0.000027221338],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018186814,0.00006126631,0.0000034482216,0.000059396174,0.00006608098,0.0000016850986,0.00031202845,0.90745986,0.088465184,0.000059702306,0.0031233528,0.0003698039],"study_design_scores_gemma":[0.00066035474,0.0000833743,0.000014077858,0.0000869064,0.00003661935,0.000020932524,0.000034291304,0.8346023,0.16291696,0.0000017612509,0.0012769985,0.0002654248],"about_ca_topic_score_codex":0.000051462026,"about_ca_topic_score_gemma":0.000007823346,"teacher_disagreement_score":0.9383982,"about_ca_system_score_codex":0.00023174229,"about_ca_system_score_gemma":0.000026258687,"threshold_uncertainty_score":1},"labels":[],"label_agreement":null},{"id":"W2126017276","doi":"10.1109/ccece.1997.614847","title":"A method for optimal pricing of electric supply including transmission system considerations","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University; Technical University of Nova Scotia","funders":"","keywords":"Electricity pricing; Computer science; Electricity; Electric power transmission; Bundle; Mathematical optimization; Electricity market; Transmission (telecommunications); Electric power system; Power (physics); Engineering; Telecommunications; Electrical engineering; Mathematics","score_opus":0.021183180624534,"score_gpt":0.24764845866978374,"score_spread":0.22646527804524974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2126017276","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016611076,0.0007626698,0.9898452,0.000046742993,0.00007911509,0.0005649528,0.00000313355,0.00041935916,0.006617689],"genre_scores_gemma":[0.6594075,0.000019644667,0.3403694,0.000006266105,0.000021784983,0.000046984485,0.0000025612924,0.000025736705,0.000100083664],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990213,0.00004434624,0.00042102166,0.00014751963,0.00012960864,0.00023622677],"domain_scores_gemma":[0.99934196,0.00033403814,0.000054061864,0.00012473424,0.000091986825,0.000053240743],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027366527,0.00012993671,0.00025106093,0.00024730602,0.00009240602,0.000023358978,0.00006124134,0.00008537076,0.00007217673],"category_scores_gemma":[0.00003468317,0.00012622181,0.00006994487,0.00042987225,0.0000035154742,0.00013591858,0.0000054075254,0.00007117483,0.0000038049043],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000073997016,0.00003620435,0.000033219523,0.00097234437,0.00011080707,0.00000255029,0.001200453,0.81718683,0.15208487,0.011118736,0.0044060377,0.012840514],"study_design_scores_gemma":[0.00033584438,0.000052363735,0.0000075482935,0.00007473901,0.000035125493,0.000040512205,0.000048228914,0.891183,0.10783507,0.000017234084,0.0002504975,0.00011983527],"about_ca_topic_score_codex":0.000010992592,"about_ca_topic_score_gemma":0.0000011101652,"teacher_disagreement_score":0.65774643,"about_ca_system_score_codex":0.00013729489,"about_ca_system_score_gemma":0.000013394399,"threshold_uncertainty_score":0.51471764},"labels":[],"label_agreement":null},{"id":"W2126251090","doi":"10.1109/ccece.2011.6030486","title":"Short-term hydro-thermal scheduling with environmental considerations using bacterial foraging algorithm","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Foraging; Mathematical optimization; Computer science; Scheduling (production processes); Optimization problem; Minification; Job shop scheduling; Convergence (economics); Multi-objective optimization; Mathematics; Schedule; Ecology","score_opus":0.017698729458394392,"score_gpt":0.1935833131142354,"score_spread":0.175884583655841,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2126251090","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5111172,0.000030903535,0.4859561,0.0000013352179,0.00017718638,0.00015043732,0.000003997847,0.0002127783,0.0023500633],"genre_scores_gemma":[0.763469,0.0000026947196,0.23636204,0.000007219928,0.00007798139,0.000009364957,0.00001445515,0.00004210524,0.000015183992],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992109,0.000019313564,0.00021963294,0.00016778662,0.0001206877,0.0002616609],"domain_scores_gemma":[0.99972177,0.000015483085,0.000023538894,0.00016079884,0.000009103865,0.00006929717],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006694472,0.00016673081,0.00014122757,0.00008595384,0.00010866478,0.000052946005,0.00005429021,0.00006248885,0.00048887654],"category_scores_gemma":[0.0000022236381,0.00016037487,0.00002758407,0.00007322175,0.000025531128,0.00037023603,0.000017261234,0.000094803996,0.000015988437],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004326043,0.00022085426,0.02657043,0.00009086363,0.0006833886,0.00022686417,0.0055900114,0.4658583,0.47792473,0.0005124729,0.000057688434,0.022221124],"study_design_scores_gemma":[0.0003264623,0.00003287386,0.0011998235,0.000026682736,0.00004119074,0.00015003081,0.00007526658,0.9591674,0.03865827,0.000011716804,0.00001055892,0.00029970662],"about_ca_topic_score_codex":0.000012325594,"about_ca_topic_score_gemma":0.0000053326935,"teacher_disagreement_score":0.4933091,"about_ca_system_score_codex":0.000114435796,"about_ca_system_score_gemma":0.000016768725,"threshold_uncertainty_score":0.65398973},"labels":[],"label_agreement":null},{"id":"W2126615038","doi":"10.1002/we.1942","title":"Variability in large‐scale wind power generation","year":2015,"lang":"en","type":"article","venue":"Wind Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":58,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Offshore wind power; Wind power; Environmental science; Meteorology; Wind speed; Climatology; Geography; Engineering; Geology","score_opus":0.00888771309757743,"score_gpt":0.1932813254565777,"score_spread":0.18439361235900026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2126615038","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6229223,0.00042328163,0.3140115,0.00010045428,0.0018077486,0.00014092191,0.000008540248,0.00037765034,0.06020759],"genre_scores_gemma":[0.99863,0.0000066573098,0.00082175067,0.000054536864,0.00015416124,0.0000056964523,0.000037087975,0.00002488741,0.00026520807],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99915195,0.00008722634,0.00021573837,0.00016430752,0.00014756566,0.00023319689],"domain_scores_gemma":[0.99960846,0.000017955335,0.00001945968,0.0002262015,0.000044791082,0.00008315208],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047612382,0.0001080321,0.00013107111,0.000093021685,0.000017243672,0.000023774934,0.00008268649,0.000117853866,0.00004879633],"category_scores_gemma":[0.000048375256,0.00011591487,0.000021469416,0.0003124643,0.0000062156414,0.00016943604,0.000015301808,0.0000725094,0.000020882235],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000045933093,0.00005015193,0.0019814896,0.0000060281254,0.000011760789,0.0000045645397,0.0012324809,0.9885221,0.0014475283,0.0013653992,0.0049439524,0.00042993337],"study_design_scores_gemma":[0.0007963667,0.000039164614,0.0019032992,0.000011577883,0.0000065917498,0.000009048717,0.000079967795,0.95933914,0.002926558,0.00031943835,0.03426974,0.00029911424],"about_ca_topic_score_codex":0.0000666071,"about_ca_topic_score_gemma":0.00021248175,"teacher_disagreement_score":0.37570772,"about_ca_system_score_codex":0.00020936034,"about_ca_system_score_gemma":0.000034539746,"threshold_uncertainty_score":0.47268713},"labels":[],"label_agreement":null},{"id":"W2127664368","doi":"10.1109/tpwrs.2007.894867","title":"Pricing Energy and Reserves Using Stochastic Optimization in an Alternative Electricity Market","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":141,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"Independent Electricity System Operator","keywords":"Activity-based costing; Electricity market; Electric power system; Linear programming; Energy market; Stochastic programming; Electricity; Electricity pricing; Computer science; Profit (economics); Mathematical optimization; Contingency; Operations research; Economics; Microeconomics; Engineering; Electrical engineering; Mathematics; Power (physics)","score_opus":0.01221753262752926,"score_gpt":0.2313100404976195,"score_spread":0.21909250787009024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127664368","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.049918678,0.00026009415,0.94712603,0.000002210777,0.0013341543,0.0003029871,0.000006374788,0.0002251052,0.00082438346],"genre_scores_gemma":[0.99840236,0.00004890281,0.0013545903,0.000006236826,0.000022972317,0.000025575935,0.0000025678453,0.00006570751,0.00007106809],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983566,0.00013820193,0.00050991506,0.0003133303,0.00027386926,0.00040807543],"domain_scores_gemma":[0.99924153,0.00023993095,0.00008490375,0.00023927193,0.00007248505,0.00012188248],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005902925,0.0002420926,0.00027407246,0.0007894248,0.00010697041,0.00009134356,0.00012069546,0.0001569807,0.000012824249],"category_scores_gemma":[0.000012328085,0.00026922204,0.000034397475,0.00087809004,0.000019778226,0.00050376717,8.8252403e-7,0.00019099526,8.0776204e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044896336,0.000049534785,0.000028855944,0.00003598782,0.00003330043,0.0000085826705,0.00048091693,0.997996,0.0009906325,0.00003659185,0.000009395267,0.00028535852],"study_design_scores_gemma":[0.000408412,0.000117236705,0.000057671154,0.0001355967,0.000017696631,0.0000464064,0.00015599429,0.99606204,0.0027172957,0.0000036053177,0.000017821589,0.0002602185],"about_ca_topic_score_codex":0.00044939778,"about_ca_topic_score_gemma":0.00027539447,"teacher_disagreement_score":0.9484837,"about_ca_system_score_codex":0.00046578402,"about_ca_system_score_gemma":0.00002549136,"threshold_uncertainty_score":0.999976},"labels":[],"label_agreement":null},{"id":"W2127971672","doi":"10.1109/mper.2001.4311153","title":"Energetic Operation Planning Using Genetic Algorithms","year":2001,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Generality; Computer science; Mathematical optimization; Genetic algorithm; Convergence (economics); Parallelism (grammar); Electric power system; Class (philosophy); Nonlinear programming; Adaptation (eye); Nonlinear system; Optimization problem; Cascade; Algorithm; Power (physics); Artificial intelligence; Mathematics; Machine learning; Engineering; Parallel computing","score_opus":0.014647809033862149,"score_gpt":0.24093081076050066,"score_spread":0.2262830017266385,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127971672","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010080797,0.17624293,0.81051844,0.000018561559,0.0015169719,0.00036972552,0.0000016297272,0.00068426254,0.00056668353],"genre_scores_gemma":[0.89451045,0.051599067,0.052668363,0.00021787448,0.00043940337,0.00012247327,0.000021603175,0.00029409103,0.0001266902],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986635,0.000024165314,0.00047552073,0.00022889236,0.00021706187,0.00039088586],"domain_scores_gemma":[0.9994544,0.000028606366,0.000042992495,0.00031603046,0.000048889626,0.000109082925],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001900549,0.00028095543,0.00036001133,0.00015030349,0.00004199728,0.00004700354,0.00017294481,0.000087128785,0.00008306004],"category_scores_gemma":[0.000033595028,0.0003016141,0.000081000195,0.0005400882,0.000005924547,0.00019368604,0.000011334061,0.00016814888,0.000060689148],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[3.989754e-7,0.0000056856707,0.000059231206,0.0006812313,0.000030504996,0.000030261726,0.000037342383,0.993295,0.0034646094,0.0000080966165,0.0006088574,0.0017787723],"study_design_scores_gemma":[0.00013605981,0.00002047341,0.00014959274,0.0026864791,0.00006139594,0.0002833945,0.0000015329608,0.9752541,0.0010601232,0.0000014554038,0.019923741,0.0004216387],"about_ca_topic_score_codex":0.0000042814927,"about_ca_topic_score_gemma":1.8549241e-7,"teacher_disagreement_score":0.88442963,"about_ca_system_score_codex":0.0001768672,"about_ca_system_score_gemma":0.000019448342,"threshold_uncertainty_score":0.9999436},"labels":[],"label_agreement":null},{"id":"W2128378447","doi":"10.1109/pes.2007.385504","title":"Secondary Reserve Dispatch Accounting for Wind Power Randomness and Spillage","year":2007,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Reserve requirement; Spillage; Bidding; Electric power system; Computer science; Scheduling (production processes); Probabilistic logic; Reliability engineering; Operations research; Power system simulation; Randomness; Power (physics); Engineering; Electrical engineering; Operations management; Business; Economics; Mathematics","score_opus":0.0043725682953713735,"score_gpt":0.2033347062928229,"score_spread":0.19896213799745155,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2128378447","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67854905,0.0018438231,0.31566322,0.000029281999,0.0018767772,0.0004937108,0.000013424558,0.0006300468,0.0009006833],"genre_scores_gemma":[0.9627912,0.00006666079,0.03625065,0.00006467273,0.00047614877,0.000032444506,0.000016129188,0.00019027121,0.000111813],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99774337,0.000018723013,0.00060738664,0.00041943468,0.0002885831,0.00092251],"domain_scores_gemma":[0.9989497,0.0003795007,0.00009555589,0.00028025778,0.00012856959,0.00016643366],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0018873988,0.0004176603,0.00043143507,0.00011428058,0.00018418695,0.00014787281,0.0002107215,0.0002779578,0.000010617311],"category_scores_gemma":[0.00014936594,0.0004649539,0.00023155787,0.00042405832,0.000025318428,0.0003530282,0.000045060595,0.00036156122,0.0000029349405],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053042484,0.000027695452,0.0022178623,0.001041697,0.00041437263,0.000013852225,0.003948057,0.69349194,0.2912203,0.00016703545,0.006144521,0.0012596493],"study_design_scores_gemma":[0.004232988,0.00009921555,0.0024492582,0.00046499536,0.00009115981,0.00006368763,0.0004680866,0.9046754,0.07762562,0.00002959814,0.008133772,0.0016661918],"about_ca_topic_score_codex":0.000019216855,"about_ca_topic_score_gemma":0.0000070977235,"teacher_disagreement_score":0.28424218,"about_ca_system_score_codex":0.00019640537,"about_ca_system_score_gemma":0.00002406262,"threshold_uncertainty_score":0.99978024},"labels":[],"label_agreement":null},{"id":"W2128889856","doi":"10.1109/pes.2009.5275925","title":"Training T&amp;#x00026;D's next generation for next generation networks: The CIGRE experience","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Alberta Energy","funders":"","keywords":"Next-generation network; Government (linguistics); Investment (military); Order (exchange); Business; Telecommunications; Computer science; Engineering; Finance; Politics; Political science","score_opus":0.11537010572180338,"score_gpt":0.26791067272380314,"score_spread":0.15254056700199975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2128889856","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0388286,0.0009971521,0.95620525,0.00021813656,0.00079033145,0.00056618446,9.698032e-7,0.000380719,0.0020126514],"genre_scores_gemma":[0.980044,0.00012858745,0.017277844,0.00042653945,0.0013834733,0.00014219548,0.00009630621,0.000031630156,0.00046941696],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99892104,0.00003758508,0.0003268911,0.00022847072,0.0001572587,0.00032873274],"domain_scores_gemma":[0.99948215,0.00004928732,0.000050005758,0.00028876314,0.00007479928,0.000054985314],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023512056,0.00018027022,0.0001474121,0.00006091714,0.00023072107,0.0002856003,0.00016795815,0.00011261262,0.00006597685],"category_scores_gemma":[0.00004187367,0.00014558138,0.000059306967,0.00027506877,0.000011816016,0.00061831577,0.0000059301665,0.00009624745,0.000012415576],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000027471915,0.000007751214,0.000005327751,0.000004276489,0.000012423821,2.3187637e-7,0.0022903967,0.8549714,0.081974454,0.0012598984,0.009147958,0.050323103],"study_design_scores_gemma":[0.00016661266,0.000041020743,0.00002357705,0.0000074346,0.000010804166,0.000008856008,0.00018441888,0.9901194,0.0022685172,0.000024231613,0.006955627,0.00018950846],"about_ca_topic_score_codex":0.000005662441,"about_ca_topic_score_gemma":0.00005556452,"teacher_disagreement_score":0.9412154,"about_ca_system_score_codex":0.00009383115,"about_ca_system_score_gemma":0.000019507113,"threshold_uncertainty_score":0.59366363},"labels":[],"label_agreement":null},{"id":"W2129281754","doi":"10.1016/j.eneco.2009.05.007","title":"A ‘simple’ hybrid model for power derivatives","year":2009,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Randomness; Markov chain; Simple (philosophy); Mathematical optimization; Black–Scholes model; Markov process; Electricity; Computer science; Spot contract; Supply and demand; Econometrics; Economics; Mathematics; Microeconomics; Volatility (finance); Financial economics; Futures contract","score_opus":0.007408280484817648,"score_gpt":0.18755272050676436,"score_spread":0.1801444400219467,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2129281754","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.053071618,0.00015570711,0.9385527,0.000048386322,0.00014821599,0.0000710742,0.00001452748,0.00020460084,0.0077332132],"genre_scores_gemma":[0.9930717,0.00007706532,0.0061982907,0.00017463099,0.000051537532,0.000023020011,0.00003476952,0.0000307505,0.0003382587],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994708,0.0000038133257,0.00018476203,0.00012859385,0.000016535276,0.00019554119],"domain_scores_gemma":[0.9997326,0.00001957276,0.000030882256,0.00015529034,0.000017731754,0.00004392407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000044845074,0.00011194911,0.00013667946,0.000065091524,0.00003115504,0.000027466373,0.000098633296,0.00004020358,0.000008343187],"category_scores_gemma":[0.000008651197,0.00013382934,0.000047497793,0.000037998438,0.000005002466,0.00015430016,0.000005223967,0.000028615088,0.0000020226196],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004455103,0.000006774316,0.000016501954,0.0000026786017,0.000018157501,1.9018992e-7,0.000059293012,0.98249525,0.00012878585,0.012569822,0.0027467515,0.00195137],"study_design_scores_gemma":[0.00019672509,0.000026091531,0.000015662947,0.000002145848,0.0000034722705,0.000002615881,0.0000043192595,0.9817044,0.003732265,0.006508027,0.007652885,0.00015135702],"about_ca_topic_score_codex":0.0000014050419,"about_ca_topic_score_gemma":0.000006548347,"teacher_disagreement_score":0.94000006,"about_ca_system_score_codex":0.00010455747,"about_ca_system_score_gemma":0.00001623538,"threshold_uncertainty_score":0.5457402},"labels":[],"label_agreement":null},{"id":"W2129823301","doi":"10.1109/pes.2008.4596558","title":"Environmental and economic analysis of Ontario&amp;#x2019;s Standard Offer Program for small power producers","year":2008,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Renewable energy; Investment (military); Environmental economics; Context (archaeology); Production (economics); Economic analysis; Distributed generation; Business; Generator (circuit theory); Electricity generation; Return on investment; Power (physics); Finance; Economics; Engineering; Electrical engineering; Microeconomics; Agricultural economics; Political science","score_opus":0.008942897412165703,"score_gpt":0.19195367470721394,"score_spread":0.18301077729504825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2129823301","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9582356,0.00010276057,0.039452437,0.000007569519,0.00007316499,0.00055879256,0.00003092357,0.00009378714,0.0014449424],"genre_scores_gemma":[0.96545106,0.000026115222,0.033219304,0.0000046460377,0.0000081350145,0.00005617889,0.000049863982,0.00002096931,0.0011637469],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9993787,0.0000064709316,0.00022531173,0.0001735922,0.00006052684,0.00015539877],"domain_scores_gemma":[0.9997217,0.00001783608,0.000037381822,0.00017107524,0.0000078288,0.000044185042],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008066373,0.00011078037,0.00025162505,0.00016076589,0.000027504671,0.000009487208,0.00005176252,0.0000506589,0.00022483245],"category_scores_gemma":[0.000002978658,0.00010879848,0.00007584493,0.00007849494,0.000025392974,0.00006710394,0.00001042221,0.000038060898,0.000004465421],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027221782,0.00027928178,0.4494984,0.00019417732,0.008261185,0.0000014877628,0.009650742,0.5053578,0.013817425,0.00024790896,0.0030958469,0.009323531],"study_design_scores_gemma":[0.00589034,0.0021744056,0.47810897,0.000044176206,0.0038684842,0.00007428328,0.0002784307,0.1795827,0.024072353,0.000051036226,0.30315605,0.002698755],"about_ca_topic_score_codex":0.00066951994,"about_ca_topic_score_gemma":0.007845664,"teacher_disagreement_score":0.3257751,"about_ca_system_score_codex":0.00047023114,"about_ca_system_score_gemma":0.000045328852,"threshold_uncertainty_score":0.44366732},"labels":[],"label_agreement":null},{"id":"W2130126778","doi":"10.1109/tpwrs.2003.821443","title":"Unit Commitment With Dual Variable Constraints","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Unit (ring theory); Electricity market; Dual (grammatical number); Electricity; Margin (machine learning); Variable (mathematics); Economic dispatch; Economics; Computer science; Microeconomics; Production (economics); Operations research; Unit price; Marginal cost; Mathematical optimization; Electric power system; Power (physics); Engineering; Mathematics","score_opus":0.008631209271090732,"score_gpt":0.1925792035961298,"score_spread":0.18394799432503905,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2130126778","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0027652567,0.000097546465,0.97654814,0.000025157458,0.0022725312,0.0006169356,0.000053570406,0.00069982634,0.016921042],"genre_scores_gemma":[0.99797785,0.000012877645,0.0012374591,0.000025095023,0.000013220715,0.00014504026,0.000005706194,0.00006974074,0.0005130059],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986927,0.00004715128,0.00034408248,0.00023310643,0.00032097747,0.00036200977],"domain_scores_gemma":[0.9993066,0.00004607509,0.000048118764,0.00038035025,0.000083492174,0.00013531501],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015666649,0.0002629996,0.00027115998,0.00020806864,0.00013197471,0.00008461668,0.00011927779,0.00013238406,0.00009747426],"category_scores_gemma":[0.0000010957733,0.00024296583,0.0000457448,0.0005359191,0.000052167456,0.00018511643,3.7731232e-7,0.00025342623,0.00017651291],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016168935,0.00009461866,0.0000071073473,0.00006171263,0.00018185722,0.000021127638,0.0002915565,0.9975094,0.0005261594,0.0010481906,0.00018231194,0.000059781876],"study_design_scores_gemma":[0.06103109,0.01233844,0.0005237339,0.011391694,0.002223661,0.01298124,0.009607745,0.52465,0.23260711,0.0004588314,0.11747803,0.0147084715],"about_ca_topic_score_codex":0.00007656414,"about_ca_topic_score_gemma":0.000017428196,"teacher_disagreement_score":0.9952126,"about_ca_system_score_codex":0.00032098588,"about_ca_system_score_gemma":0.00008831661,"threshold_uncertainty_score":0.9907859},"labels":[],"label_agreement":null},{"id":"W2130809507","doi":"","title":"Assessing the benefits of wind power curtailment in a hydro-dominated power system","year":2009,"lang":"en","type":"article","venue":"2009 CIGRE/IEEE PES Joint Symposium Integration of Wide-Scale Renewable Resources Into the Power Delivery System","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Wind power; Electric power system; Variable (mathematics); Reliability engineering; Power grid; Power (physics); Grid; Engineering; Operations research; Environmental economics; Environmental science; Economics; Electrical engineering; Geography; Mathematics","score_opus":0.007449038513740531,"score_gpt":0.20981489602530154,"score_spread":0.202365857511561,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2130809507","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9478839,0.005250065,0.017664768,0.00053185405,0.0014421988,0.0019077441,0.00003795241,0.0004898291,0.02479168],"genre_scores_gemma":[0.9986842,0.00015207761,0.0005010334,0.000052331696,0.00008584203,0.000064264685,0.000021773145,0.000106748135,0.00033171615],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9935922,0.0008109555,0.0027778328,0.0007066974,0.0012853289,0.0008270034],"domain_scores_gemma":[0.9960589,0.0004883008,0.0011755598,0.0014112206,0.0006893308,0.00017672332],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0024220294,0.00081315445,0.0013394133,0.00088345725,0.00030525294,0.00029603782,0.0010404277,0.00045166077,0.000033551743],"category_scores_gemma":[0.00008929934,0.00056910986,0.0004512417,0.0015179504,0.00018089116,0.0008125314,0.00008031392,0.0005588815,0.000029251307],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012437504,0.00018014117,0.000733976,0.00054867193,0.00024291396,0.00001457447,0.017624384,0.889814,0.088215545,0.00030051227,0.0015608043,0.0006401014],"study_design_scores_gemma":[0.0029657702,0.0014458154,0.007077468,0.014773538,0.00051931787,0.00043426466,0.044880636,0.6259897,0.2970421,0.000054400796,0.002651823,0.0021652076],"about_ca_topic_score_codex":0.0014478315,"about_ca_topic_score_gemma":0.00026036485,"teacher_disagreement_score":0.26382434,"about_ca_system_score_codex":0.0013102874,"about_ca_system_score_gemma":0.00011823143,"threshold_uncertainty_score":0.99967605},"labels":[],"label_agreement":null},{"id":"W2133886886","doi":"10.1109/tpwrs.2002.800909","title":"Network-constrained multiperiod auction for a pool-based electricity market","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":156,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Electricity market; Computer science; Electricity; Scheduling (production processes); Power system simulation; Operations research; Flexibility (engineering); Industrial organization; Operator (biology); Microeconomics; Transparency (behavior); Mathematical optimization; Economics; Electric power system; Operations management; Engineering; Power (physics); Computer security","score_opus":0.011132055854155129,"score_gpt":0.19126979284515416,"score_spread":0.18013773699099903,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2133886886","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0006385705,0.00043646825,0.9882247,0.000057796788,0.004841697,0.0015151426,0.000076409655,0.0011536449,0.003055571],"genre_scores_gemma":[0.9963565,0.00002275199,0.0010975773,0.000057020305,0.00007531401,0.0006883887,0.0000073519936,0.00011070487,0.0015843933],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99797976,0.000114953196,0.0005924085,0.00038160745,0.00029297295,0.0006383269],"domain_scores_gemma":[0.9989887,0.00021970704,0.00009890691,0.00041363086,0.00013414353,0.00014489962],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032920451,0.00036497714,0.00040282094,0.0003250902,0.00025486122,0.00011538067,0.00017411071,0.00027216415,0.00022702715],"category_scores_gemma":[0.000010289123,0.0003976603,0.00020263648,0.00078208797,0.000027711676,0.00021316877,3.0641885e-7,0.0002733722,0.0000668465],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054443404,0.0001036752,0.0000052713704,0.0001273603,0.00011656562,0.0000028260952,0.00010831576,0.98271567,0.0005997551,0.000017710288,0.015319021,0.00082939496],"study_design_scores_gemma":[0.0012554183,0.00025341343,0.000011346637,0.000101133184,0.00006247336,0.000040630825,0.000023817129,0.98955053,0.0021793486,0.0000030703932,0.0061091846,0.00040966104],"about_ca_topic_score_codex":0.000028282817,"about_ca_topic_score_gemma":0.0000140319735,"teacher_disagreement_score":0.99571794,"about_ca_system_score_codex":0.00037857902,"about_ca_system_score_gemma":0.000027306962,"threshold_uncertainty_score":0.99984753},"labels":[],"label_agreement":null},{"id":"W2134064228","doi":"10.1109/ccece.1999.808226","title":"Rotating power cuts in Alberta-the past and the future","year":2003,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Deregulation; Electricity; Duration (music); Power (physics); Engineering; Electrical engineering; Economics; Market economy; Physics","score_opus":0.0019054551963623107,"score_gpt":0.1651378173813256,"score_spread":0.1632323621849633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2134064228","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14429392,0.005448559,0.08068912,0.005648262,0.0016070335,0.0015268248,7.929923e-7,0.00031141564,0.7604741],"genre_scores_gemma":[0.99802375,0.000030867282,0.00076883374,0.00011085064,0.00003190844,0.000019490584,4.09643e-7,0.000013401861,0.001000473],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995702,0.000058755486,0.00011861243,0.00006637584,0.00006140695,0.00012467602],"domain_scores_gemma":[0.9996975,0.00014802485,0.000013152055,0.00011694142,0.00000990866,0.0000144917385],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022656642,0.000068294234,0.00007378295,0.000024416075,0.00004297529,0.000031813466,0.00005626186,0.00003422472,0.000036707454],"category_scores_gemma":[0.000037108875,0.000036112215,0.000012959904,0.00020860066,0.000012343161,0.000054281936,0.0000055992227,0.000098965684,0.000009591308],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005766572,0.00006432135,0.097205386,0.00020862489,0.00027429283,0.000017322485,0.03169773,0.26145443,0.00034189032,0.5484799,0.044302523,0.01589592],"study_design_scores_gemma":[0.0061254557,0.00006083852,0.014919591,0.00010170907,0.00004937208,0.00022326117,0.0032323294,0.8522771,0.0007770705,0.0020662316,0.11921609,0.00095095456],"about_ca_topic_score_codex":0.000046823792,"about_ca_topic_score_gemma":0.00038096373,"teacher_disagreement_score":0.85372984,"about_ca_system_score_codex":0.000013901852,"about_ca_system_score_gemma":0.000004357808,"threshold_uncertainty_score":0.14726134},"labels":[],"label_agreement":null},{"id":"W2134704122","doi":"10.1109/tpwrs.2006.888956","title":"A Model for Efficient Consumer Pricing Schemes in Electricity Markets","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":132,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Complementarity (molecular biology); Electricity market; Marginal cost; Economics; Microeconomics; Electricity pricing; Electricity retailing; Variable pricing; Ex-ante; Industrial organization; Welfare; Business; Market economy","score_opus":0.011983649339828605,"score_gpt":0.22736286847161183,"score_spread":0.21537921913178323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2134704122","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0349801,0.00046210433,0.9601823,0.000006808915,0.0014978915,0.0011952863,0.000019783323,0.00039987374,0.0012558295],"genre_scores_gemma":[0.9977752,0.00002037313,0.0015309929,0.00001542974,0.000009385799,0.00018998343,0.0000021034778,0.00007302385,0.00038352242],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99818534,0.000038330185,0.00061448826,0.000303086,0.00027329492,0.00058548147],"domain_scores_gemma":[0.99920714,0.00023658464,0.0000662077,0.0002901582,0.000096537224,0.00010336573],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008320367,0.00025650323,0.00032241718,0.00063886424,0.000094214076,0.00004622357,0.00014221024,0.00019051327,0.0000060124557],"category_scores_gemma":[0.000011405166,0.00027452357,0.000103260274,0.00077120226,0.000014883306,0.00010106085,4.8422794e-7,0.0002559373,0.000017044056],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006656664,0.00009302324,0.000019424948,0.00013119327,0.00005100191,0.000003246247,0.000368181,0.99605626,0.002568085,0.000077858036,0.0001795197,0.00038566164],"study_design_scores_gemma":[0.00073829136,0.00004251046,0.000028426204,0.00012295766,0.000020760095,0.000017789253,0.000047063146,0.9875706,0.010740779,0.0000025755455,0.00039031866,0.00027793212],"about_ca_topic_score_codex":0.000024281735,"about_ca_topic_score_gemma":0.000033164157,"teacher_disagreement_score":0.9627951,"about_ca_system_score_codex":0.00052772876,"about_ca_system_score_gemma":0.0000479835,"threshold_uncertainty_score":0.9999707},"labels":[],"label_agreement":null},{"id":"W2135084663","doi":"10.1109/naps.2008.5307304","title":"Transmission planning in deregulated markets considering GenCos' strategic behavior","year":2008,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Electricity market; Computer science; Operator (biology); Transmission (telecommunications); Simulated annealing; Competition (biology); Transmission system; Electricity; Operations research; Mathematical optimization; Industrial organization; Telecommunications; Business; Engineering; Electrical engineering","score_opus":0.02631107345652174,"score_gpt":0.22367362133465615,"score_spread":0.1973625478781344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135084663","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95632666,0.0006919649,0.027380258,0.000006082785,0.00010652695,0.00022316753,4.527748e-7,0.0004736621,0.014791247],"genre_scores_gemma":[0.99593085,0.000060262122,0.003785128,0.0000064841774,0.0000110093115,0.000021139835,0.000006939015,0.000030667004,0.00014753811],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991976,0.000025709776,0.00027030773,0.0001402011,0.00011615083,0.00025003575],"domain_scores_gemma":[0.99975514,0.000036777397,0.000016499293,0.00011143656,0.000015661219,0.00006448705],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008209819,0.00013215162,0.00014757922,0.00017097595,0.00004242202,0.000012994288,0.00006582618,0.00010155081,0.00015425259],"category_scores_gemma":[0.0000040735003,0.00013593989,0.000024612933,0.00030527436,0.000010153186,0.00013002644,0.00000487495,0.00012350679,0.000011028051],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003562838,0.00010645974,0.054018077,0.00019572357,0.000047040216,0.0012808064,0.0022256665,0.8733642,0.06278587,0.00021134416,0.0008675538,0.004861612],"study_design_scores_gemma":[0.0011030773,0.000034080265,0.06025004,0.00018348038,0.000016553215,0.00053309894,0.0001577647,0.9151973,0.021773223,0.00004071703,0.00018843154,0.0005222055],"about_ca_topic_score_codex":0.00001786974,"about_ca_topic_score_gemma":0.0000064007545,"teacher_disagreement_score":0.04183311,"about_ca_system_score_codex":0.00007599221,"about_ca_system_score_gemma":0.00002695842,"threshold_uncertainty_score":0.55434674},"labels":[],"label_agreement":null},{"id":"W2135395455","doi":"10.1109/tpwrs.2002.800947","title":"Equilibrium of auction markets with unit commitment: the need for augmented pricing","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":77,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Profit (economics); Microeconomics; Computer science; Scope (computer science); Unit (ring theory); Competition (biology); Economics; Work (physics); Market power; Mathematical economics; Electric power system; Operations research; Mathematical optimization; Power (physics); Engineering; Mathematics","score_opus":0.01453428199598955,"score_gpt":0.19806629931967523,"score_spread":0.18353201732368568,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135395455","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008605152,0.0002972881,0.9848962,0.00006776808,0.0018741786,0.0013956495,0.000042139236,0.00031346854,0.002508143],"genre_scores_gemma":[0.99800867,0.000021338536,0.00017595528,0.000010911176,0.0000155858,0.00028219522,0.0000038564854,0.000064879605,0.0014165846],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877995,0.0000864325,0.00041726668,0.00017653866,0.00026560895,0.00027420104],"domain_scores_gemma":[0.9991582,0.0001657273,0.000110155044,0.0003934963,0.00011798359,0.000054419077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023257037,0.0002100758,0.0002560762,0.00021387832,0.00010467139,0.000045240995,0.00016026599,0.00009454448,0.000043471748],"category_scores_gemma":[0.0000027930857,0.00015945654,0.000081252365,0.00057988026,0.00003017768,0.00017938121,5.247078e-7,0.00015046138,0.000013275224],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008879463,0.00011260842,0.000017874954,0.00028767766,0.0003472786,0.0000011488938,0.0008733004,0.9932415,0.0027192922,0.00004657825,0.0019289936,0.00033494912],"study_design_scores_gemma":[0.0014367559,0.0004082205,0.000044767232,0.00031378935,0.0001366598,0.000058467733,0.0004659674,0.97721654,0.015651837,0.0000018098015,0.003976424,0.0002887385],"about_ca_topic_score_codex":0.000030411878,"about_ca_topic_score_gemma":0.00000825181,"teacher_disagreement_score":0.98940355,"about_ca_system_score_codex":0.00013946356,"about_ca_system_score_gemma":0.000010160163,"threshold_uncertainty_score":0.6502449},"labels":[],"label_agreement":null},{"id":"W2139030509","doi":"10.1287/opre.1040.0117","title":"Valuation and Optimal Operation of Electric Power Plants in Competitive Markets","year":2004,"lang":"en","type":"article","venue":"Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":102,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University; Queen's University","funders":"","keywords":"Hydroelectricity; Valuation (finance); Electricity; Spot contract; Computer science; Nonlinear system; Thermal power station; Mathematical optimization; Electricity market; Mean reversion; Economics; Econometrics; Mathematics; Futures contract; Engineering; Electrical engineering","score_opus":0.02460379229547448,"score_gpt":0.3068818606813805,"score_spread":0.282278068385906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2139030509","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95113206,0.00043426003,0.041546695,0.00013386238,0.00005185496,0.0008055666,0.0000066437296,0.000040492814,0.0058485614],"genre_scores_gemma":[0.9968567,0.000201733,0.0027028555,0.0000041907224,0.000012514632,0.00010672923,0.0000341067,0.000016345855,0.0000648415],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988659,0.00015710163,0.00025583347,0.00015357917,0.00033858625,0.00022900058],"domain_scores_gemma":[0.9995172,0.00007372104,0.00000765576,0.00012759914,0.0002304853,0.000043315846],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007661891,0.00007992302,0.000118583004,0.00053778576,0.0000899251,0.00007726041,0.00008149529,0.00007262673,0.00006400755],"category_scores_gemma":[0.00011475449,0.00008479414,0.000010931037,0.0006036855,0.000027721446,0.0003512283,0.000019567531,0.00020295255,0.00003126149],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001085455,0.00004783509,0.00021928473,0.000019437397,0.000011705436,0.0000021412561,0.00095666386,0.9515928,0.042155895,0.004268126,0.000047137466,0.00066813116],"study_design_scores_gemma":[0.0010200079,0.00016528784,0.01884213,0.00008649326,0.0000026525574,0.000015736214,0.0003647411,0.94474006,0.0344013,0.00017569996,0.000032252516,0.00015364993],"about_ca_topic_score_codex":0.000156399,"about_ca_topic_score_gemma":0.00015965437,"teacher_disagreement_score":0.045724623,"about_ca_system_score_codex":0.00024076669,"about_ca_system_score_gemma":0.00012189847,"threshold_uncertainty_score":0.34578046},"labels":[],"label_agreement":null},{"id":"W2140745986","doi":"10.1109/pct.2007.4538440","title":"Effect of Risk Measures on Bilateral Trading in Electricity Markets","year":2007,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Negotiation; Regret; Outcome (game theory); Profit (economics); Electricity; Microeconomics; Actuarial science; Business; Economics; Computer science; Engineering","score_opus":0.0037386579867071863,"score_gpt":0.20465472975681373,"score_spread":0.20091607177010654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2140745986","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9244243,0.00012559046,0.05472279,0.0000012655707,0.00013212753,0.00018216025,6.8445456e-7,0.00014818924,0.020262906],"genre_scores_gemma":[0.99968696,0.000029005289,0.00021894422,0.000002932325,0.000019131052,0.0000031400596,0.0000011047432,0.000018266355,0.000020496134],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999175,0.0000947256,0.00024435658,0.00010125949,0.00015244313,0.00023220938],"domain_scores_gemma":[0.99939835,0.0004202231,0.000030355211,0.00010706011,0.000011910032,0.000032107862],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001455646,0.00010860284,0.00017861834,0.00032684207,0.000012000189,0.0000066705516,0.000068241294,0.00007140265,0.000013758743],"category_scores_gemma":[0.00012949563,0.000092097696,0.000036141264,0.00052693865,0.0000041965895,0.00005569712,0.0000028716292,0.00013811057,0.0000043268083],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012829732,0.00015115972,0.32280284,0.00050061115,0.00020331047,0.00005836584,0.0010814714,0.20935334,0.06043212,0.0004245218,0.001587164,0.4021221],"study_design_scores_gemma":[0.00092042674,0.0003154721,0.066839844,0.000064730215,0.000015937521,0.000006293475,0.0000027004126,0.31256464,0.6189891,0.000024071453,0.00004897487,0.00020777913],"about_ca_topic_score_codex":0.00004898242,"about_ca_topic_score_gemma":0.00005159647,"teacher_disagreement_score":0.558557,"about_ca_system_score_codex":0.00012947475,"about_ca_system_score_gemma":0.000003927483,"threshold_uncertainty_score":0.3755635},"labels":[],"label_agreement":null},{"id":"W2140919703","doi":"10.1109/pes.2003.1267219","title":"A power system assessment tool for the deregulated electricity market","year":2004,"lang":"en","type":"article","venue":"2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro One (Canada); HydraTek (Canada)","funders":"","keywords":"Activity-based costing; Electricity market; Reliability engineering; Reliability (semiconductor); Electricity; Computer science; Electric power system; Software; Maximum power transfer theorem; Electric power industry; Operations research; Power (physics); Engineering; Electrical engineering; Business","score_opus":0.004068287912081899,"score_gpt":0.20017087517521884,"score_spread":0.19610258726313695,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2140919703","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18759489,0.0009462379,0.79531276,0.00012065373,0.00929358,0.0023699242,0.00006686649,0.002626953,0.0016680983],"genre_scores_gemma":[0.85784733,0.00020709613,0.13852932,0.00020360133,0.00090482435,0.00079464796,0.00004283428,0.00047559536,0.0009947781],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99564373,0.00009381974,0.0010962317,0.0007875764,0.0007585472,0.001620108],"domain_scores_gemma":[0.9975103,0.00036368266,0.00023393049,0.0009265004,0.0007195416,0.00024602187],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001684416,0.00092379365,0.0007679349,0.00016020075,0.00045556275,0.00027988205,0.0007276118,0.00053231424,0.000030675506],"category_scores_gemma":[0.00023606404,0.00085860834,0.00056600507,0.0016597735,0.000047950507,0.00031365658,0.000042238124,0.0006378351,0.000039189894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013503306,0.00004852473,0.000068332556,0.00043621965,0.0005891718,0.0000064745363,0.00043647186,0.8738813,0.08905967,0.00028671487,0.035108365,0.00006529423],"study_design_scores_gemma":[0.0015193796,0.00012099937,0.00036163823,0.00034744787,0.00015601127,0.00006908475,0.00007944916,0.97365767,0.01865973,0.000006107983,0.0039183204,0.0011041606],"about_ca_topic_score_codex":0.00005331396,"about_ca_topic_score_gemma":0.000003157553,"teacher_disagreement_score":0.67025244,"about_ca_system_score_codex":0.0024884045,"about_ca_system_score_gemma":0.0002990187,"threshold_uncertainty_score":0.9993865},"labels":[],"label_agreement":null},{"id":"W2141549267","doi":"10.1109/ccece.1999.808218","title":"Allocation of transmission losses in a deregulated power system network","year":2003,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Transmission (telecommunications); Computer science; Transmission loss; Generator (circuit theory); Electric power system; Deregulation; AC power; Transmission network; Power (physics); Transmission system; Control theory (sociology); Telecommunications; Economics","score_opus":0.0034498061653550197,"score_gpt":0.17083404921130252,"score_spread":0.1673842430459475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141549267","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.065931365,0.0014068589,0.87639266,0.000008158533,0.00021961008,0.00032886077,3.749602e-7,0.00033783005,0.055374272],"genre_scores_gemma":[0.99583983,0.000016758957,0.004019341,0.0000027362657,0.000004988002,0.000007697153,0.00000423425,0.000017902825,0.00008649519],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993494,0.000047022582,0.0002798559,0.00008334073,0.00009226559,0.00014808192],"domain_scores_gemma":[0.99977314,0.000023983286,0.000025742558,0.00011549052,0.00003369957,0.000027911236],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017189565,0.00008026829,0.0001332789,0.000082541286,0.000010416084,0.0000060759658,0.00004509009,0.00007698944,0.000041547995],"category_scores_gemma":[0.000007797412,0.00007622275,0.000020211392,0.0005402515,0.0000042531033,0.000072011484,0.0000013130851,0.00004181249,0.0000053937356],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000046105793,0.000015030107,0.0009004332,0.00020243395,0.000016339563,0.0000015804668,0.00017439219,0.9880213,0.0026918724,0.0070422716,0.00047315308,0.00045657362],"study_design_scores_gemma":[0.0008717846,0.0000559225,0.002659113,0.00064136105,0.000017446535,0.00002781414,0.0001590512,0.94758445,0.046144426,0.00008154474,0.0014469611,0.00031014645],"about_ca_topic_score_codex":0.000015254954,"about_ca_topic_score_gemma":0.000010179244,"teacher_disagreement_score":0.92990845,"about_ca_system_score_codex":0.00007981727,"about_ca_system_score_gemma":0.000016368831,"threshold_uncertainty_score":0.31082737},"labels":[],"label_agreement":null},{"id":"W2141888992","doi":"10.1109/ccece.2006.277804","title":"Security-Constrained Unit Commitment using Particle Swarms","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Power system simulation; Particle swarm optimization; Mathematical optimization; Computer science; Set (abstract data type); Integer (computer science); Nonlinear system; Power (physics); Electric power system; Algorithm; Mathematics","score_opus":0.010763305671769472,"score_gpt":0.2106991478315253,"score_spread":0.19993584215975582,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141888992","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69509536,0.00024249515,0.2580984,0.000053276908,0.00024140689,0.00024175762,0.0000032534758,0.0008284395,0.04519561],"genre_scores_gemma":[0.99724746,0.0000026808214,0.002428401,0.000018683706,0.00005067463,0.0000061142664,0.000007652454,0.000019914965,0.00021844765],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993988,0.000018472298,0.00018504649,0.000084726096,0.000098585646,0.00021436464],"domain_scores_gemma":[0.9997679,0.000019750316,0.000015792273,0.00013521589,0.00002343205,0.000037888058],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000084320156,0.00009302957,0.00009498369,0.000039134775,0.000039853676,0.00003181167,0.000059199177,0.000041120802,0.000105982406],"category_scores_gemma":[0.0000033805063,0.00009266314,0.000023909839,0.00024588595,0.000013611163,0.000096666656,0.000008845605,0.000053906184,0.000037516726],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000030800252,0.00006643783,0.0061304774,0.000047860263,0.00004302978,0.000011955673,0.00015560708,0.96112114,0.01599135,0.013851913,0.002085053,0.00049211085],"study_design_scores_gemma":[0.0003183024,0.000012025969,0.00023751758,0.00000976122,0.000011695037,0.0000131642655,0.000035953017,0.9635054,0.034358937,0.00035018372,0.0010020004,0.00014504547],"about_ca_topic_score_codex":0.000121534795,"about_ca_topic_score_gemma":0.000046369903,"teacher_disagreement_score":0.30215207,"about_ca_system_score_codex":0.000071764625,"about_ca_system_score_gemma":0.000010116396,"threshold_uncertainty_score":0.3778693},"labels":[],"label_agreement":null},{"id":"W2142396477","doi":"10.5547/issn0195-6574-ej-vol28-no3-9","title":"An Oligopolistic Electricity Market Model with Interdependent Segments","year":2007,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"HEC Montréal","funders":"","keywords":"Oligopoly; Cournot competition; Economics; Interdependence; Electricity market; Electricity; Microeconomics; Demand curve; Inverse demand function; Market power; Monopoly","score_opus":0.004473645073086492,"score_gpt":0.2031306585315606,"score_spread":0.1986570134584741,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2142396477","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025243262,0.0001850657,0.95114934,0.000016373668,0.00018758963,0.00003251723,7.8565495e-7,0.000105438,0.023079604],"genre_scores_gemma":[0.99720967,0.00006150562,0.0018807213,0.00006732498,0.00022301755,0.0000018457424,0.0000018478638,0.000039570594,0.0005145089],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989775,0.00007363005,0.00023701486,0.000085466854,0.00027456423,0.00035186837],"domain_scores_gemma":[0.9995251,0.00002673785,0.00006721618,0.00019277519,0.000056763874,0.00013134892],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00079261465,0.00013475021,0.00010899497,0.0001297594,0.00013481907,0.00007792144,0.00029459412,0.00004142907,0.00003469275],"category_scores_gemma":[0.0000074597133,0.00008906742,0.000029813784,0.00021082697,0.000013840016,0.00016468774,0.000011249715,0.00024988368,0.0000028670265],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005360854,0.000027079726,0.00009994831,0.00000407506,0.00007981882,0.000033573353,0.00020774455,0.9907433,0.0013526005,0.0005314259,0.0018894474,0.00497739],"study_design_scores_gemma":[0.00032524692,0.00008318423,0.00032532917,0.00002372473,0.0000277061,0.0007797494,0.000037428377,0.9941356,0.0035650928,0.00039988483,0.0001448777,0.00015217919],"about_ca_topic_score_codex":0.0000140004395,"about_ca_topic_score_gemma":0.000056989156,"teacher_disagreement_score":0.9719664,"about_ca_system_score_codex":0.00024151757,"about_ca_system_score_gemma":0.000028627472,"threshold_uncertainty_score":0.3632064},"labels":[],"label_agreement":null},{"id":"W2142713059","doi":"10.1109/pesw.2000.850064","title":"Generator contribution coefficients for pricing transmission services","year":2002,"lang":"en","type":"article","venue":"2000 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.00CH37077)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland; Government of Newfoundland and Labrador","funders":"","keywords":"Generator (circuit theory); Electric power transmission; Computer science; Slack bus; Electric power system; Transmission (telecommunications); Tariff; Flow (mathematics); Power flow; Transmission line; Transmission system; Power-flow study; Mathematical optimization; Power (physics); AC power; Electrical engineering; Telecommunications; Mathematics; Voltage; Engineering; Economics","score_opus":0.006112609138245592,"score_gpt":0.18536161855571537,"score_spread":0.17924900941746977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2142713059","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3437667,0.0006195672,0.6460934,0.0001673847,0.0024592793,0.0017547057,0.00005639881,0.00259389,0.002488643],"genre_scores_gemma":[0.9640992,0.0002967329,0.033982158,0.00013828136,0.00042466528,0.00027696043,0.0000493029,0.00022819194,0.0005044829],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9965021,0.0000128974525,0.00090439914,0.0007850598,0.00056249957,0.0012330358],"domain_scores_gemma":[0.9981,0.00009483898,0.00021279376,0.0002578914,0.0010142437,0.00032025433],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00053348753,0.00076929113,0.0006666897,0.00019938465,0.00025507875,0.00040920405,0.0006036662,0.0004756776,0.00008456708],"category_scores_gemma":[0.000077265635,0.00083061634,0.00038365563,0.0006851074,0.000042433872,0.0007054603,0.00004332982,0.00035749967,0.00009387109],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054310847,0.00021728389,0.0007796792,0.0028056162,0.0005183436,0.0000030042504,0.019731415,0.09131587,0.8601126,0.00013645028,0.022313133,0.0020122936],"study_design_scores_gemma":[0.0010906905,0.00014013288,0.000043346467,0.0009422063,0.000085749656,0.000015150706,0.00027243615,0.94881177,0.04023275,0.0000059804806,0.007499983,0.0008597912],"about_ca_topic_score_codex":0.000009540527,"about_ca_topic_score_gemma":7.5437083e-7,"teacher_disagreement_score":0.8574959,"about_ca_system_score_codex":0.0006810971,"about_ca_system_score_gemma":0.00004111832,"threshold_uncertainty_score":0.99941444},"labels":[],"label_agreement":null},{"id":"W2143241152","doi":"10.1109/ccece.2009.5090088","title":"Evaluation and comparison of economical efficiency of HVDC and AC transmission","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Reactance; Software; Electric power transmission; Transmission line; Computer science; Transmission (telecommunications); Process (computing); Transmission system; Reliability engineering; Engineering; Electrical engineering; Voltage; Telecommunications; Operating system","score_opus":0.012293521818996764,"score_gpt":0.2612209961723501,"score_spread":0.24892747435335336,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143241152","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8461356,0.0013643091,0.1476649,0.00002359499,0.000021315445,0.00014460222,3.7431744e-7,0.00002643331,0.00461885],"genre_scores_gemma":[0.9981245,0.000039680184,0.0018201515,0.0000015903372,0.000003283261,7.303523e-7,0.0000013419307,0.0000028676914,0.000005857733],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996141,0.000016899548,0.00018515883,0.00005744522,0.00007834066,0.00004802118],"domain_scores_gemma":[0.9998594,0.000020525871,0.00002424833,0.000045467357,0.00002927885,0.000021094815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020884427,0.000041140524,0.000120971046,0.000048805923,0.000007357409,0.0000033175247,0.000020198995,0.000035350862,0.000016251812],"category_scores_gemma":[0.000009308561,0.00003779844,0.00000818847,0.000056161956,0.000008045788,0.000047568516,0.0000015959599,0.000022476062,2.4801582e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025943144,0.00013823884,0.004697414,0.0002133355,0.000034753662,9.0546806e-8,0.0021240688,0.3168994,0.14078414,0.0012410891,0.0003675435,0.53347397],"study_design_scores_gemma":[0.00026159652,0.00008665733,0.005565855,0.000015990896,0.000017548875,8.0578394e-7,0.000015631465,0.949966,0.043948796,0.00006470557,0.000018615528,0.00003779964],"about_ca_topic_score_codex":0.0000026230618,"about_ca_topic_score_gemma":8.793579e-7,"teacher_disagreement_score":0.6330666,"about_ca_system_score_codex":0.000014763331,"about_ca_system_score_gemma":0.000007478248,"threshold_uncertainty_score":0.15413757},"labels":[],"label_agreement":null},{"id":"W2143713801","doi":"10.1109/pes.2006.1708976","title":"Supply adequacy mechanisms and cross-border contracts in the Central American regional electricity market","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Business; Electricity market; Industrial organization; Mains electricity; Electricity; Engineering","score_opus":0.003028271181776102,"score_gpt":0.22466657109957616,"score_spread":0.22163829991780007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143713801","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83656,0.0017956562,0.15783647,0.00019799166,0.00063794444,0.00053271453,0.000020681893,0.00056997803,0.0018485393],"genre_scores_gemma":[0.98143965,0.0001349355,0.017593557,0.00019186665,0.00029877145,0.000054686636,0.000021120602,0.00008882679,0.00017659718],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99775535,0.00007156958,0.00048798672,0.00034979876,0.00038373974,0.00095153955],"domain_scores_gemma":[0.99931455,0.00022026381,0.000093825365,0.00022942713,0.000057283385,0.0000846682],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00069623755,0.0003719022,0.00033569496,0.00009301466,0.000118968965,0.00017951254,0.00021082361,0.00014865585,0.00001571362],"category_scores_gemma":[0.00004626204,0.00035427537,0.00013940275,0.000775586,0.000047149777,0.00022036457,0.000017210063,0.00042898871,0.0000021673914],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009275375,0.000042664302,0.0039474918,0.00006198734,0.000059545408,0.000011876472,0.000561183,0.94525295,0.03858884,0.0005426619,0.010589173,0.0003323577],"study_design_scores_gemma":[0.0007827988,0.00005121422,0.050858848,0.000073970245,0.000026231708,0.0000801419,0.00007376405,0.9388271,0.004791296,0.000049762373,0.0036967841,0.00068807765],"about_ca_topic_score_codex":0.00053914025,"about_ca_topic_score_gemma":0.000047646434,"teacher_disagreement_score":0.14487962,"about_ca_system_score_codex":0.0002457803,"about_ca_system_score_gemma":0.000029172068,"threshold_uncertainty_score":0.9998909},"labels":[],"label_agreement":null},{"id":"W2144133756","doi":"10.1109/pes.2011.6039089","title":"Stochastic analysis of wind penetration impact on electricity market prices","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Electricity generation; Monte Carlo method; Electricity market; Wind speed; Wake; Electric power system; Computer science; Electricity; Stochastic process; Meteorology; Power (physics); Engineering; Electrical engineering; Aerospace engineering; Mathematics; Physics","score_opus":0.010328127320952635,"score_gpt":0.21396768561232618,"score_spread":0.20363955829137353,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144133756","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36770067,0.00006629446,0.5464038,0.0000011097964,0.00005500569,0.00016700741,0.0000046199125,0.0001494722,0.08545202],"genre_scores_gemma":[0.9990485,0.000006881201,0.0007735058,0.0000039006645,0.000009428806,0.0000031471309,0.000009988374,0.000012489953,0.0001321608],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993358,0.000023228351,0.00022279813,0.000111111774,0.00015438838,0.00015267769],"domain_scores_gemma":[0.99960816,0.00006791782,0.000060000446,0.00017450248,0.000049100418,0.000040339877],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016760972,0.00011059428,0.00021625425,0.0005591028,0.000015119524,0.000009580203,0.0000881093,0.000056958892,0.0007912431],"category_scores_gemma":[0.000028547895,0.00009123983,0.00009385853,0.0016015542,0.000005366335,0.00011159678,0.0000037667444,0.000055842356,0.000007767729],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004854604,0.00006661248,0.0046602357,0.000022265764,0.0013689881,6.986336e-7,0.00033712518,0.9902176,0.0015449086,0.0003883227,0.0006261069,0.000718587],"study_design_scores_gemma":[0.00008349667,0.00012666568,0.15343061,0.0000047601857,0.00027681724,6.150095e-7,0.0000054941274,0.8426343,0.00332216,0.000014182861,0.00000140163,0.00009950269],"about_ca_topic_score_codex":0.00010435638,"about_ca_topic_score_gemma":0.000035102174,"teacher_disagreement_score":0.63134784,"about_ca_system_score_codex":0.00009042026,"about_ca_system_score_gemma":0.000014543164,"threshold_uncertainty_score":0.8663557},"labels":[],"label_agreement":null},{"id":"W2144696934","doi":"10.1109/mper.2002.4311743","title":"Modeling Competition in Transmission Expansion","year":2002,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Transmission (telecommunications); Competition (biology); Investment (military); Electricity market; Lagrangian relaxation; Electricity; Reliability (semiconductor); Industrial organization; Transmission system; Key (lock); Computer science; Operator (biology); Business; Telecommunications; Engineering; Mathematical optimization; Electrical engineering; Mathematics; Computer security","score_opus":0.011476498320397105,"score_gpt":0.19926032966697318,"score_spread":0.18778383134657609,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144696934","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0059659304,0.20069699,0.78987527,0.00008556231,0.00065735605,0.00047703765,0.0000014395903,0.00072245055,0.0015179865],"genre_scores_gemma":[0.91876423,0.07872882,0.002259401,0.000055299202,0.000033617667,0.000054471286,0.0000065212507,0.000068957575,0.00002869449],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99887645,0.000021376649,0.00044715815,0.00018467964,0.00018449518,0.00028584644],"domain_scores_gemma":[0.9996319,0.00002100513,0.00001732398,0.00022553625,0.0000262696,0.000077954996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019552631,0.0002102478,0.00032278823,0.00017688873,0.000016423357,0.000015558142,0.00012172556,0.00008265361,0.00017161031],"category_scores_gemma":[0.000017063887,0.00022097286,0.00007231861,0.0005292868,0.000002804188,0.00019660903,0.00000444226,0.00021135813,0.00009247712],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[3.9279033e-7,0.000014555367,0.0000032487305,0.0017472036,0.000006258829,0.0000074014947,0.00007699629,0.99097013,0.0023095969,0.00003655568,0.00043375758,0.004393886],"study_design_scores_gemma":[0.00015958399,0.000012683902,0.000006578302,0.0058978335,0.000011439803,0.000019436611,0.0000010466181,0.9882562,0.00036087394,0.0000025214265,0.00503381,0.0002379487],"about_ca_topic_score_codex":0.000003079724,"about_ca_topic_score_gemma":6.8341893e-7,"teacher_disagreement_score":0.9127983,"about_ca_system_score_codex":0.00013051176,"about_ca_system_score_gemma":0.0000034815807,"threshold_uncertainty_score":0.9011012},"labels":[],"label_agreement":null},{"id":"W2144728297","doi":"10.1109/melcon.2006.1653253","title":"Tools for Voltage Collapse Assessment","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Electric power system; Market clearing; Computation; Electricity market; Electricity; Mathematical optimization; Variety (cybernetics); Maximum power transfer theorem; Voltage; Power (physics); Reliability engineering; Engineering; Economics; Electrical engineering; Algorithm; Mathematics","score_opus":0.007641639441017883,"score_gpt":0.22226701919803662,"score_spread":0.21462537975701873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144728297","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002814606,0.000051912324,0.8683793,0.000019117904,0.00021327024,0.00030917834,0.000005168293,0.00035174092,0.12785572],"genre_scores_gemma":[0.9733011,0.0000029877663,0.022941098,0.00001775654,0.0000839302,0.000095909716,0.00003512641,0.000022097365,0.003499995],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959487,0.0000032944713,0.00012934075,0.00006987839,0.00006582438,0.00013680256],"domain_scores_gemma":[0.9997881,0.000059875343,0.000010999989,0.00009514151,0.00002916495,0.000016703334],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007240099,0.00006289062,0.00007529445,0.00003742274,0.000022223256,0.000058428137,0.00004770383,0.000035295652,0.000045506455],"category_scores_gemma":[0.000007972398,0.00006171358,0.000024371153,0.00011439101,0.0000022289148,0.0001279659,0.0000036949343,0.000022595317,0.000012795461],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000049467117,0.000057622772,0.0013358295,0.00017363291,0.000052442527,0.0000032606877,0.000023995744,0.58384967,0.021982308,0.05917708,0.32653144,0.006807757],"study_design_scores_gemma":[0.00062822166,0.00004589226,0.002171508,0.00000983391,0.000013388528,0.0000046038144,0.000014398258,0.9276738,0.01140414,0.00044109515,0.057354115,0.00023896973],"about_ca_topic_score_codex":0.00001672655,"about_ca_topic_score_gemma":0.000029543304,"teacher_disagreement_score":0.9704865,"about_ca_system_score_codex":0.0000933115,"about_ca_system_score_gemma":0.000012097352,"threshold_uncertainty_score":0.2516607},"labels":[],"label_agreement":null},{"id":"W2145144002","doi":"10.1109/cigre.2005.1532759","title":"Congestion management by commitment &amp; amp; dispatch in the balancing market","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kinectrics (Canada)","funders":"","keywords":"Economic dispatch; Power system simulation; Computer science; Electricity market; Mathematical optimization; Software; Process (computing); Linear programming; Operations research; Network congestion; Electric power system; Electricity; Power (physics); Computer network; Engineering; Operating system","score_opus":0.004138869084942728,"score_gpt":0.1893742710394484,"score_spread":0.18523540195450566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2145144002","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046509877,0.0006267811,0.56425375,0.0005101056,0.00036870476,0.0009524982,0.0000066963216,0.00042037715,0.38635123],"genre_scores_gemma":[0.9912741,0.000064535125,0.0029985688,0.0000748049,0.000027213322,0.00009087168,0.00008389385,0.000017875434,0.005368117],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992807,0.000056349305,0.00019774013,0.000107929656,0.00016615377,0.00019114427],"domain_scores_gemma":[0.9996928,0.00004736103,0.00001928263,0.00021715285,0.000009171199,0.000014225613],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031603954,0.00010356847,0.00008686381,0.00005975864,0.000029567278,0.00004499885,0.000119466495,0.000037149155,0.00010756969],"category_scores_gemma":[0.000003417076,0.00008105236,0.000017947275,0.00024303398,0.000005394204,0.00006563197,0.00001250452,0.00007240909,0.000058956226],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000051384122,0.00007060726,0.013147441,0.00009885661,0.000026428683,0.000004113481,0.0001375201,0.10006334,0.00022713144,0.0017150283,0.8825795,0.0019248975],"study_design_scores_gemma":[0.0021217118,0.000032878284,0.14161375,0.00020761708,0.00007616161,0.000028498518,0.00023801507,0.25384387,0.00041800292,0.00064540963,0.59979296,0.0009811196],"about_ca_topic_score_codex":0.00023603575,"about_ca_topic_score_gemma":0.0010234945,"teacher_disagreement_score":0.94476426,"about_ca_system_score_codex":0.00015233149,"about_ca_system_score_gemma":0.0000016259253,"threshold_uncertainty_score":0.33052194},"labels":[],"label_agreement":null},{"id":"W2145913843","doi":"10.1109/pes.2003.1270423","title":"Power price in deregulated markets","year":2004,"lang":"en","type":"article","venue":"2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Incentive; Economics; Evening; Morning; Market price; Mid price; Consistency (knowledge bases); Monetary economics; Econometrics; Price level; Microeconomics; Mathematics","score_opus":0.0034861524641936975,"score_gpt":0.18152606092577026,"score_spread":0.17803990846157655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2145913843","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.892653,0.0011003066,0.09013751,0.00009298735,0.008216406,0.0009795598,0.000023288609,0.002233677,0.004563292],"genre_scores_gemma":[0.90295947,0.0003579411,0.09437032,0.00023325335,0.0004927236,0.00015816899,0.00004305039,0.00047522425,0.00090982416],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9956311,0.00008380992,0.001106188,0.0008307418,0.00067458506,0.0016735619],"domain_scores_gemma":[0.9981953,0.000113080154,0.00016431353,0.0007700836,0.00039635872,0.00036086966],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001012008,0.0009120608,0.0007593115,0.0003099324,0.0001448067,0.00015525876,0.00058844656,0.00064811466,0.000071462],"category_scores_gemma":[0.00027407912,0.0010757968,0.00032885416,0.002432368,0.000049271977,0.00045278014,0.000048224436,0.0007536078,0.00018577457],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009272479,0.000066009845,0.00022582659,0.00018779954,0.00016688861,0.000029623025,0.0011972114,0.83103204,0.15780452,0.00005415788,0.009188226,0.000038420294],"study_design_scores_gemma":[0.0028378551,0.000106910884,0.0020877125,0.0008162937,0.000057930945,0.0001095714,0.00009382879,0.9289371,0.05777916,0.00002191406,0.00490126,0.0022505138],"about_ca_topic_score_codex":0.00006989596,"about_ca_topic_score_gemma":0.000007629089,"teacher_disagreement_score":0.10002537,"about_ca_system_score_codex":0.0016728936,"about_ca_system_score_gemma":0.00019518986,"threshold_uncertainty_score":0.99916923},"labels":[],"label_agreement":null},{"id":"W2146926333","doi":"10.1109/tpwrs.2012.2230029","title":"Security-Constrained Unit Commitment With Uncertain Wind Generation: The Loadability Set Approach","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Economic dispatch; Mathematical optimization; Electric power system; Set (abstract data type); Wind power; Software deployment; Reliability (semiconductor); Computer science; Power (physics); Engineering; Reliability engineering; Mathematics","score_opus":0.024220335845104336,"score_gpt":0.2230311499502254,"score_spread":0.19881081410512108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2146926333","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018695608,0.00042238872,0.97029054,0.0000716384,0.002227662,0.0013003242,0.00007688665,0.0003993682,0.0065155863],"genre_scores_gemma":[0.99900866,0.000010224763,0.00026618195,0.000034498335,0.000078869096,0.00024256029,0.000024526762,0.000056574187,0.00027791885],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99815446,0.00028748685,0.00042419188,0.0002501856,0.00041712372,0.0004665664],"domain_scores_gemma":[0.998905,0.0001050061,0.000072483504,0.0006641433,0.00009562824,0.00015776312],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006414899,0.0003192811,0.00028913407,0.00012431212,0.000287289,0.00011184546,0.00021306424,0.00015296611,0.00005219545],"category_scores_gemma":[0.0000023950226,0.00022749545,0.00007907885,0.0005719753,0.000080821,0.00030833474,8.803001e-7,0.00036581303,0.000044152737],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020245432,0.00018436187,0.0001602353,0.00011038027,0.00025045834,0.0000014874583,0.0029311287,0.9946043,0.00022264822,0.00034503223,0.0010988377,0.000070919734],"study_design_scores_gemma":[0.0018563224,0.00040677655,0.00015386223,0.0001439832,0.0002672849,0.000518235,0.0036259757,0.9698694,0.0065678474,0.0000071433083,0.015399527,0.0011836395],"about_ca_topic_score_codex":0.00006958109,"about_ca_topic_score_gemma":0.00002308893,"teacher_disagreement_score":0.98031306,"about_ca_system_score_codex":0.0002828985,"about_ca_system_score_gemma":0.000051295032,"threshold_uncertainty_score":0.9276995},"labels":[],"label_agreement":null},{"id":"W2146931510","doi":"10.1109/epec.2009.5420912","title":"Modified bacterial foraging algorithm for optimum economic dispatch","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Foraging; Mathematical optimization; Convergence (economics); Curse of dimensionality; Computer science; Algorithm; Mathematics; Artificial intelligence","score_opus":0.006756343551767031,"score_gpt":0.20748469015439627,"score_spread":0.20072834660262925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2146931510","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007753893,0.000034611636,0.9809632,0.000059342485,0.0008385514,0.00033854085,0.000011847478,0.00046312172,0.009536922],"genre_scores_gemma":[0.877969,0.00001539561,0.12096912,0.00003887912,0.00039296172,0.00004517557,0.0000689221,0.000038797145,0.00046170384],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993558,0.000005739834,0.00020294845,0.00014182345,0.000040448533,0.00025327347],"domain_scores_gemma":[0.99974406,0.000024360928,0.00002130256,0.00014474546,0.000014539821,0.00005098026],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008504388,0.00012176384,0.00015009673,0.00006672052,0.000036029207,0.000060102713,0.00010045806,0.00006348577,0.000044321245],"category_scores_gemma":[0.0000035091477,0.00012738975,0.000049575152,0.00005161157,0.00000294795,0.00019273827,0.0000051728816,0.00003926768,0.000022310513],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010698838,0.000017050214,0.000010979773,0.000021360338,0.000043364733,0.0000010889117,0.00008920318,0.7992358,0.0019377221,0.0017479293,0.008057106,0.18882765],"study_design_scores_gemma":[0.0004973913,0.000042011245,0.00003924452,0.0000058089136,0.000007985652,0.0000034141317,0.000004761018,0.99498504,0.002965496,0.00020449197,0.0010806733,0.00016366607],"about_ca_topic_score_codex":0.000008115682,"about_ca_topic_score_gemma":0.0000037127975,"teacher_disagreement_score":0.8702152,"about_ca_system_score_codex":0.00014389357,"about_ca_system_score_gemma":0.000013912544,"threshold_uncertainty_score":0.5194803},"labels":[],"label_agreement":null},{"id":"W2147492726","doi":"10.1002/pip.864","title":"Comparing Photovoltaic Capacity Value Metrics: A Case Study for the City of Toronto","year":2008,"lang":"en","type":"article","venue":"Progress in Photovoltaics Research and Applications","topic":"Electric Power System Optimization","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Environment and Climate Change Canada","funders":"Natural Resources Canada; Independent Electricity System Operator; Ontario Power Authority","keywords":"Photovoltaic system; Peak demand; Environmental science; Grid; Nameplate capacity; Value (mathematics); Peaking power plant; Capacity factor; Range (aeronautics); Meteorology; Statistics; Mathematics; Electricity; Power (physics); Electricity generation; Engineering; Electrical engineering; Geography; Physics","score_opus":0.11932815421234567,"score_gpt":0.3581722740692869,"score_spread":0.23884411985694126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2147492726","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9512819,0.009485213,0.032653786,0.000006135892,0.000038069542,0.0059009367,0.000026705586,0.00009716706,0.00051007763],"genre_scores_gemma":[0.9903937,0.0006392079,0.0020577377,0.0000016875873,0.000041012187,0.00681839,0.000005091848,0.000026152342,0.000017013552],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998484,0.00007787956,0.00038706613,0.00026618273,0.0003857715,0.0003991072],"domain_scores_gemma":[0.9982883,0.0007546051,0.00005275937,0.0004501008,0.00035568638,0.00009856474],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012212784,0.00013525372,0.00024313795,0.00017786713,0.00042422177,0.000042335476,0.00029280916,0.00006763004,0.0000040789405],"category_scores_gemma":[0.00008333654,0.00011569648,0.000034970686,0.0010392625,0.0002536012,0.00013559211,0.00008580453,0.00027092895,6.52041e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000077637415,0.0019015109,0.97170943,0.0006711415,0.00029027928,0.000074017364,0.008040496,0.0026778227,0.0021829852,0.0020560308,0.00041134076,0.0099072885],"study_design_scores_gemma":[0.0022579078,0.0005369531,0.019269321,0.000054457076,0.000047480862,0.00053113356,0.004903842,0.95496196,0.012821906,0.0008651544,0.003302503,0.0004473945],"about_ca_topic_score_codex":0.005417102,"about_ca_topic_score_gemma":0.0037568938,"teacher_disagreement_score":0.95244014,"about_ca_system_score_codex":0.00022745981,"about_ca_system_score_gemma":0.000051059378,"threshold_uncertainty_score":0.81890744},"labels":[],"label_agreement":null},{"id":"W2147587918","doi":"10.1109/ccece.2011.6030488","title":"Scheduling of variable-head hydro-thermal generation using an enhanced bacterial foraging algorithm","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Foraging; Mathematical optimization; Computer science; Scheduling (production processes); Job shop scheduling; Convergence (economics); Algorithm; Mathematics; Ecology; Schedule","score_opus":0.030019278531059297,"score_gpt":0.22771962262008094,"score_spread":0.19770034408902165,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2147587918","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4018013,0.000020674648,0.59536463,2.5942967e-7,0.00043115523,0.00009503913,0.0000014625664,0.00013822217,0.0021472352],"genre_scores_gemma":[0.5814127,0.0000017749267,0.4183552,0.0000032068597,0.00016834095,0.000004214474,0.000016948816,0.000026794944,0.000010886278],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991288,0.000038986265,0.00033290984,0.00015881192,0.00011651305,0.00022394193],"domain_scores_gemma":[0.9996074,0.000008269767,0.0000638825,0.00019206954,0.00007505687,0.00005335817],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020213795,0.00013416579,0.00017403261,0.00011559912,0.000046429213,0.000023947081,0.000096200696,0.000096227006,0.00021645431],"category_scores_gemma":[0.000009396114,0.00014572102,0.00002576019,0.00023040055,0.00000912045,0.00052949775,0.000012787117,0.00006883371,0.0000038719395],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003763707,0.000020217698,0.000018951814,0.00001961554,0.000023200375,4.7476527e-7,0.0004067545,0.25225267,0.7417103,0.00011417053,0.0000015377154,0.0054283463],"study_design_scores_gemma":[0.00018250528,0.000024413499,0.000014028912,0.000015977897,0.000012114209,0.0000030149586,0.000013119557,0.6381148,0.3615016,0.000009991602,0.000003857332,0.00010455998],"about_ca_topic_score_codex":0.00013770553,"about_ca_topic_score_gemma":0.000009107105,"teacher_disagreement_score":0.38586214,"about_ca_system_score_codex":0.00007087493,"about_ca_system_score_gemma":0.0000319132,"threshold_uncertainty_score":0.5942331},"labels":[],"label_agreement":null},{"id":"W2148537030","doi":"10.2202/1553-779x.1000","title":"Transmission Congestion Management and Pricing in Simple Auction Electricity Markets","year":2004,"lang":"en","type":"article","venue":"International Journal of Emerging Electric Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Bidding; Computer science; Electricity; Transmission (telecommunications); Electricity market; Mathematical optimization; Voltage; Demand response; Demand side; Transmission system; Economics; Microeconomics; Telecommunications; Electrical engineering; Engineering; Mathematics","score_opus":0.00422322843277039,"score_gpt":0.21668018837759023,"score_spread":0.21245695994481983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2148537030","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3598983,0.0057304213,0.6297245,0.00014971153,0.0024224706,0.00034552376,0.0000011843003,0.000109920315,0.0016179865],"genre_scores_gemma":[0.99776345,0.0014919194,0.0005496821,0.000014072786,0.00009881429,0.000008792306,0.000003282259,0.000031665775,0.00003831053],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980607,0.000073308525,0.00081428915,0.00016890395,0.00059606496,0.00028673775],"domain_scores_gemma":[0.9992806,0.000050670216,0.00026363254,0.000090058646,0.00022881926,0.00008626528],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068824005,0.00018814625,0.00027398922,0.0012364186,0.000039277114,0.00008883527,0.00023654256,0.00009536903,0.0000061910932],"category_scores_gemma":[0.000038580587,0.00018831535,0.00006296676,0.0006990147,0.000007890766,0.00044293984,0.000013646646,0.00028595646,0.0000022281506],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021190496,0.00014796692,0.0021234879,0.00017921631,0.0005147911,0.00032747263,0.0008683117,0.96042824,0.011982165,0.001399306,0.0007459873,0.02107117],"study_design_scores_gemma":[0.01623398,0.0011171594,0.07025201,0.0042420095,0.00029736076,0.0074204137,0.0006106217,0.8500315,0.017368712,0.002873413,0.027437085,0.0021157113],"about_ca_topic_score_codex":0.00004489059,"about_ca_topic_score_gemma":0.0000023296968,"teacher_disagreement_score":0.6378652,"about_ca_system_score_codex":0.0008897512,"about_ca_system_score_gemma":0.000043444783,"threshold_uncertainty_score":0.76792765},"labels":[],"label_agreement":null},{"id":"W2148835898","doi":"10.1109/tpwrs.2008.2007001","title":"A Generic Operations Framework for Discos in Retail Electricity Markets","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":132,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"King Abdulaziz City for Science and Technology","keywords":"Electricity; Scheduling (production processes); Grid; Operations research; Electricity market; Computer science; Electricity retailing; Context (archaeology); Operations management; Engineering","score_opus":0.01225402772100849,"score_gpt":0.2263664480501993,"score_spread":0.2141124203291908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2148835898","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0074066906,0.00048304375,0.98716027,0.00010070272,0.0019457757,0.0012943043,0.00003897563,0.00043684113,0.0011333944],"genre_scores_gemma":[0.995423,0.000080478465,0.0033989225,0.000060936716,0.00002959279,0.00046040356,0.0000070101155,0.00005606023,0.00048360156],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99833995,0.00009267478,0.0005539077,0.00032403076,0.0002303154,0.00045909098],"domain_scores_gemma":[0.99924386,0.00013569243,0.00003908241,0.00040804708,0.000072730996,0.00010056738],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002767943,0.00027303136,0.0003463677,0.00043504048,0.00013728424,0.00011609263,0.00019479833,0.00024445992,0.000029866842],"category_scores_gemma":[0.000016230944,0.0002856878,0.000119184726,0.0010443799,0.000010366445,0.0002600784,2.8305686e-7,0.00033174903,0.000029080657],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004198374,0.00014234902,0.000008367132,0.00005359497,0.000051351733,0.0000042068,0.00033752093,0.9950493,0.001666219,0.0008920125,0.0005493499,0.0012037575],"study_design_scores_gemma":[0.0007489058,0.000315331,0.00023119677,0.00023018994,0.000040955973,0.00003745387,0.00006826776,0.9907422,0.005590458,0.00009927016,0.0013521448,0.00054362713],"about_ca_topic_score_codex":0.000024951072,"about_ca_topic_score_gemma":0.000038205388,"teacher_disagreement_score":0.9880163,"about_ca_system_score_codex":0.00038760647,"about_ca_system_score_gemma":0.000047685764,"threshold_uncertainty_score":0.9999595},"labels":[],"label_agreement":null},{"id":"W2149649017","doi":"10.1109/tpwrs.2011.2146796","title":"Large-Scale Solar PV Investment Models, Tools, and Analysis: The Ontario Case","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Photovoltaic system; Investment (military); Sizing; Profit (economics); Operations research; Computer science; Return on investment; Environmental economics; Engineering; Mathematical optimization; Industrial engineering; Economics; Microeconomics; Mathematics; Electrical engineering","score_opus":0.022602733099798926,"score_gpt":0.19016241724395372,"score_spread":0.16755968414415479,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2149649017","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014971098,0.000642738,0.97529906,0.0000087394665,0.0012405931,0.00054181187,0.000080001875,0.00029120743,0.006924732],"genre_scores_gemma":[0.9983442,0.00003629406,0.00043810206,0.000047815556,0.000008034634,0.00017355608,0.000005971228,0.000043458353,0.00090259506],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986042,0.00010332198,0.0004235533,0.00029155044,0.00023121087,0.00034617094],"domain_scores_gemma":[0.9991418,0.000042724896,0.000060400547,0.0005594244,0.00006132701,0.00013431467],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000326354,0.0002575779,0.00032196313,0.00028113526,0.00023576496,0.0001144634,0.0001460774,0.00014347608,0.000066202534],"category_scores_gemma":[9.143214e-7,0.00020750133,0.00013736484,0.0005910429,0.000024111114,0.00037027104,0.0000013747251,0.0002944786,0.00002635539],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020364387,0.00014867529,0.0000749249,0.00005762977,0.0016805102,0.00012276144,0.031065185,0.9659935,0.000036195634,0.00028249333,0.0004280258,0.000089734865],"study_design_scores_gemma":[0.0005985827,0.00013427492,0.00012738036,0.000052602496,0.0011612863,0.0007687691,0.002219552,0.9912881,0.0008243331,0.000029025015,0.0023274987,0.00046857804],"about_ca_topic_score_codex":0.00425745,"about_ca_topic_score_gemma":0.018146798,"teacher_disagreement_score":0.98337305,"about_ca_system_score_codex":0.0002566131,"about_ca_system_score_gemma":0.0000358114,"threshold_uncertainty_score":0.99976945},"labels":[],"label_agreement":null},{"id":"W2149782899","doi":"","title":"Detecting and measuring market power in the Philippine wholesale electricity market","year":2010,"lang":"en","type":"article","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bidding; Electricity market; Market clearing; Electricity; Benchmark (surveying); Collusion; Market power; Industrial organization; Wholesale market; Business; Economics; Quarter (Canadian coin); Electricity retailing; Microeconomics; Engineering; Electrical engineering","score_opus":0.010473899429132138,"score_gpt":0.23040760963221646,"score_spread":0.21993371020308433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2149782899","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83464915,0.00016424416,0.00004475631,0.000081530015,0.00016064505,0.00041058022,0.0000020396044,0.000062745305,0.16442432],"genre_scores_gemma":[0.99835837,0.0008316168,0.00030085727,0.000018551658,0.00006266651,0.00006639756,0.0000011834206,0.000040912237,0.00031944277],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983583,0.00020125313,0.00034719138,0.00030359562,0.00018058115,0.00060909404],"domain_scores_gemma":[0.9988685,0.000582018,0.000035976034,0.00040407563,0.000037675607,0.000071757044],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039426154,0.00015286676,0.00020107001,0.00041611076,0.00010180256,0.00010734786,0.00031945514,0.00014617387,0.0000979239],"category_scores_gemma":[0.00067421235,0.0001458255,0.000031763873,0.00043229017,0.00005812873,0.00017611908,0.00006261043,0.0011223868,0.0000021607273],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002400291,0.00022255532,0.11233159,0.00044224376,0.00013747085,0.00011691387,0.0031529139,0.024179962,0.035955716,0.00023602725,0.00061109127,0.8223735],"study_design_scores_gemma":[0.0017809175,0.0001435769,0.15932877,0.00015180408,0.000007457407,0.00022091955,0.0007915527,0.8172925,0.003229951,0.00024642068,0.016027354,0.00077877165],"about_ca_topic_score_codex":0.000021839434,"about_ca_topic_score_gemma":0.00066213467,"teacher_disagreement_score":0.8215947,"about_ca_system_score_codex":0.0002500417,"about_ca_system_score_gemma":0.000048730824,"threshold_uncertainty_score":0.5946591},"labels":[],"label_agreement":null},{"id":"W2150161391","doi":"10.1109/ccece.2002.1015168","title":"Transmission congestion relief solutions by load management","year":2003,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Electricity; Electricity market; Congestion management; Transmission (telecommunications); Business; Network congestion; Load management; Electric power system; Consumption (sociology); Computer science; Environmental economics; Industrial organization; Microeconomics; Power (physics); Economics; Computer security; Telecommunications; Engineering","score_opus":0.00511282200010867,"score_gpt":0.1757653938714832,"score_spread":0.17065257187137453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150161391","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0002163043,0.0009879135,0.7427453,0.000047155674,0.00014958548,0.0001445666,7.203533e-7,0.00038450357,0.25532395],"genre_scores_gemma":[0.9745424,0.00088159164,0.014240518,0.000039265826,0.000010082146,0.000040327694,0.000017277662,0.000032600416,0.010195939],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994331,0.00002157244,0.00013525055,0.00010140879,0.00013079803,0.00017787315],"domain_scores_gemma":[0.9997957,0.000009211185,0.000009425388,0.00011501954,0.000022072032,0.000048577378],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012915346,0.00008099162,0.000063265834,0.000043481923,0.00004970883,0.000015962582,0.00004302627,0.000051682386,0.000169994],"category_scores_gemma":[0.000004750512,0.00008097384,0.000020343492,0.00019343154,0.000004804404,0.00008389436,0.000002363285,0.000050411723,0.00008427969],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007018167,0.00013702514,0.00006233467,0.00024110344,0.00014024146,0.000007827162,0.00024007037,0.31487757,0.012288167,0.063541,0.56749254,0.040965118],"study_design_scores_gemma":[0.0011249805,0.000060008657,0.00013301466,0.00008266056,0.000060810533,0.000021444637,0.000057020847,0.24065274,0.014915917,0.000459468,0.7419216,0.00051033706],"about_ca_topic_score_codex":0.0000046729265,"about_ca_topic_score_gemma":0.0000015784682,"teacher_disagreement_score":0.9743261,"about_ca_system_score_codex":0.00014844925,"about_ca_system_score_gemma":0.0000071818476,"threshold_uncertainty_score":0.33020172},"labels":[],"label_agreement":null},{"id":"W2150235996","doi":"10.1109/psce.2009.4840044","title":"Transmission planning risk indices - what now?","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Technische Universiteit Eindhoven; Chalmers Tekniska Högskola; Centre for Energy Advancement through Technological Innovation","keywords":"Transmission (telecommunications); Computer science; Risk analysis (engineering); Set (abstract data type); Process (computing); Risk management; Risk perception; Risk assessment; Perception; Business; Computer security; Telecommunications; Psychology","score_opus":0.004755274292984656,"score_gpt":0.2049876647860351,"score_spread":0.20023239049305044,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150235996","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09034048,0.0071622063,0.8630095,0.00013585539,0.00037852552,0.00019402441,6.242858e-7,0.001326673,0.037452128],"genre_scores_gemma":[0.9945278,0.000944283,0.004176256,0.000044377157,0.000039671515,0.0000019606612,0.0000052171044,0.000012391364,0.00024803678],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951947,0.000013671401,0.00012912625,0.00008768019,0.00010028986,0.0001497545],"domain_scores_gemma":[0.99980885,0.00002656724,0.000018312348,0.00008806734,0.000009038166,0.00004919635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008387087,0.00008391334,0.00008412762,0.00008498996,0.00003894007,0.0000782608,0.00007114306,0.00006231375,0.000061220235],"category_scores_gemma":[0.0000041409417,0.000074402466,0.000022025404,0.00018284163,0.0000022963154,0.00048728604,0.0000015276207,0.00009198869,0.000040074243],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000104846895,0.000026362326,0.00178868,0.000041319083,0.000036731955,0.000012485692,0.0021030414,0.6394326,0.003805341,0.00015251688,0.008931713,0.34365875],"study_design_scores_gemma":[0.00060553086,0.00014855676,0.008300121,0.00029591416,0.000032806016,0.000018309907,0.00022861545,0.94510275,0.022610728,0.0002519887,0.021933315,0.00047134273],"about_ca_topic_score_codex":0.000002244719,"about_ca_topic_score_gemma":6.662266e-7,"teacher_disagreement_score":0.9041873,"about_ca_system_score_codex":0.000026486532,"about_ca_system_score_gemma":0.000004389329,"threshold_uncertainty_score":0.30340445},"labels":[],"label_agreement":null},{"id":"W2150361993","doi":"10.1109/pes.2008.4596757","title":"A reduced model of the Alberta electric system for policy, regulatory, and future development studies","year":2008,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Reliability (semiconductor); Electricity; Electricity market; Electricity system; Electricity generation; Electric power system; Scale (ratio); Wind power; Transmission system; Electric power transmission; Mains electricity; Environmental economics; Computer science; Environmental science; Transmission (telecommunications); Reliability engineering; Engineering; Economics; Electrical engineering; Telecommunications; Power (physics); Voltage","score_opus":0.014782353068758731,"score_gpt":0.21147846947497856,"score_spread":0.19669611640621984,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150361993","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92103744,0.0063646706,0.05915508,0.000639466,0.0006645191,0.0020141962,0.0000036885524,0.00042886913,0.00969205],"genre_scores_gemma":[0.9950966,0.00011064015,0.0035084556,0.000010106273,0.00007454645,0.00006278863,7.345711e-7,0.000021637818,0.0011144575],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993791,0.000011793212,0.00023526086,0.00010582693,0.000108468426,0.00015956073],"domain_scores_gemma":[0.9996662,0.000036622023,0.000044512035,0.00015145817,0.00007540411,0.000025787815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007723921,0.00010934892,0.00018295729,0.00009168594,0.00009252206,0.00000385673,0.00008745706,0.00005557727,1.9736842e-7],"category_scores_gemma":[0.00002031888,0.000075271084,0.00002911336,0.00030478416,0.00001260346,0.000043624994,0.00001801879,0.000035027333,4.0095136e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000098015094,0.00009978727,0.0010266552,0.006645146,0.0022222374,0.0000014963232,0.03141016,0.6755273,0.14207946,0.10085842,0.031062363,0.008969003],"study_design_scores_gemma":[0.0005645883,0.000027303227,0.000572093,0.000085114385,0.000032096996,0.00005905731,0.00023396849,0.8403662,0.1570804,0.000044950084,0.0006794704,0.0002548],"about_ca_topic_score_codex":0.000016127282,"about_ca_topic_score_gemma":0.000026141563,"teacher_disagreement_score":0.16483891,"about_ca_system_score_codex":0.00021367734,"about_ca_system_score_gemma":0.00011314302,"threshold_uncertainty_score":0.30694658},"labels":[],"label_agreement":null},{"id":"W2150459452","doi":"10.1109/pmaps.2006.360194","title":"Transmission Expansion under Risk using Stochastic Programming","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Randomness; Mathematical optimization; Probabilistic logic; Constraint (computer-aided design); Transmission (telecommunications); Computer science; Stochastic programming; Variance (accounting); Stochastic modelling; Stochastic process; Expected value; Capacity planning; Mathematics; Statistics; Economics","score_opus":0.006774774171094178,"score_gpt":0.20009531818731194,"score_spread":0.19332054401621776,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150459452","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07558887,0.00038340714,0.92198634,0.000004881132,0.00012693775,0.00019453383,4.5237772e-7,0.0005930537,0.0011215113],"genre_scores_gemma":[0.9597717,0.0000046291393,0.039991688,0.000002587581,0.00005588587,0.000006743785,0.000006877477,0.000037134978,0.00012279],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99929476,0.00002062739,0.00019641561,0.00012587788,0.00013982898,0.00022247003],"domain_scores_gemma":[0.99977785,0.000023561273,0.00002485936,0.00011086308,0.00002329491,0.000039581082],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008972572,0.000117076794,0.00010223524,0.00009561212,0.00007064522,0.0000335251,0.000050480536,0.0000726804,0.000032119886],"category_scores_gemma":[0.0000033126187,0.000107667795,0.00003410644,0.00027170364,0.000006619275,0.00012434795,0.0000043386062,0.000086603686,0.000010942852],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000016379586,0.000011279842,0.000040189094,0.000017465914,0.0000059056074,9.871934e-7,0.000029629897,0.9831927,0.0065831067,0.00010405949,0.00007886529,0.009934185],"study_design_scores_gemma":[0.0002008844,0.000013294752,0.00014987228,0.000037651727,0.000021563726,0.000012429804,0.000020235813,0.9964315,0.0026450024,0.00013640095,0.00017963402,0.00015149092],"about_ca_topic_score_codex":0.00016212394,"about_ca_topic_score_gemma":0.000010252565,"teacher_disagreement_score":0.8841828,"about_ca_system_score_codex":0.00009840155,"about_ca_system_score_gemma":0.00001203168,"threshold_uncertainty_score":0.43905652},"labels":[],"label_agreement":null},{"id":"W2150807949","doi":"10.1109/pedg.2010.5545792","title":"A study of the reduction of the regional aggregated wind power forecast error by spatial smoothing effects in the Maritime Canada","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Wind power; Smoothing; Wind speed; Meteorology; Environmental science; Forecast error; Wind direction; Spatial correlation; Computer science; Statistics; Econometrics; Mathematics; Geography; Engineering; Telecommunications","score_opus":0.00409037978862284,"score_gpt":0.1786946688157325,"score_spread":0.17460428902710967,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150807949","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9967351,0.000031145202,0.00035879284,0.0002550228,0.00081726536,0.00084116356,0.000003112531,0.000017391374,0.00094101205],"genre_scores_gemma":[0.999791,3.7362324e-7,0.000033221088,0.000025367255,0.000021970256,0.000014701301,0.0000020536781,0.000015384976,0.00009588774],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99902534,0.00013435291,0.00025155809,0.00010298141,0.0003463006,0.00013943882],"domain_scores_gemma":[0.99940705,0.00009524516,0.00009842608,0.00033649395,0.00004797858,0.0000148223235],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025816052,0.00010332116,0.00012689762,0.000035462668,0.000055205943,0.000010801476,0.00030495453,0.000060949384,0.000018174222],"category_scores_gemma":[0.000073458745,0.00005497124,0.000031366817,0.0004295456,0.000026690539,0.000058612535,0.000026348618,0.0002739989,1.709376e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027315755,0.0021534835,0.114007615,0.0007563741,0.0010179478,0.000028934222,0.060313914,0.42427623,0.23500973,0.0018298136,0.15154485,0.00878793],"study_design_scores_gemma":[0.008171698,0.0008227716,0.5060339,0.0008143955,0.00030822362,0.0004880071,0.009244278,0.36750007,0.1026107,0.0002485395,0.0024492417,0.001308165],"about_ca_topic_score_codex":0.19420287,"about_ca_topic_score_gemma":0.4846079,"teacher_disagreement_score":0.3920263,"about_ca_system_score_codex":0.00007159126,"about_ca_system_score_gemma":0.00009059901,"threshold_uncertainty_score":0.811163},"labels":[],"label_agreement":null},{"id":"W2150823515","doi":"10.1016/j.jup.2014.03.006","title":"The EU internal electricity market: Done forever?","year":2014,"lang":"en","type":"article","venue":"Utilities Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":98,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Decentralization; Electricity market; Domestic market; Quarter (Canadian coin); Consumption (sociology); Economics; Market economy; Renewable energy; Business; Payment; Industrial organization; Economic policy; International trade; Finance; Engineering","score_opus":0.003202275714546914,"score_gpt":0.1913101816904742,"score_spread":0.18810790597592728,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150823515","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029406201,0.0013047896,0.1050382,0.0011081188,0.000968458,0.00039124815,0.000014378845,0.0009902072,0.8607784],"genre_scores_gemma":[0.98830765,0.00014986035,0.00013685015,0.00016268983,0.000546152,0.000023837061,0.0000024257904,0.000032691747,0.01063781],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99901366,0.000073021234,0.00022762266,0.000111303925,0.00015565401,0.00041875977],"domain_scores_gemma":[0.9993376,0.00023535616,0.000033460263,0.00029358678,0.000037069825,0.00006292728],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032144354,0.00013952752,0.0001322076,0.00011805658,0.0001226495,0.0000772176,0.00026729683,0.00006145457,0.00004549317],"category_scores_gemma":[0.00025055834,0.00010986568,0.000056714325,0.0003026667,0.000039765448,0.0000967765,0.000029923305,0.00014323676,0.000045890523],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012414194,0.0000506675,0.001817979,0.00038856047,0.00037688733,0.0000036164195,0.0025300907,0.0067625376,0.0009272162,0.289444,0.49356657,0.20400774],"study_design_scores_gemma":[0.00041704025,0.00008434619,0.0027283677,0.000035986086,0.000014024976,0.000029940617,0.000066965935,0.41369343,0.003212086,0.0040559773,0.5753356,0.00032620798],"about_ca_topic_score_codex":0.00034686216,"about_ca_topic_score_gemma":0.00008543972,"teacher_disagreement_score":0.95890146,"about_ca_system_score_codex":0.00019142056,"about_ca_system_score_gemma":0.000031916512,"threshold_uncertainty_score":0.44801924},"labels":[],"label_agreement":null},{"id":"W2151027979","doi":"10.1109/59.910787","title":"Z-bus loss allocation","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":405,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Exploit; Computer science; Mathematical optimization; Computation; Context (archaeology); Process (computing); Consistency (knowledge bases); Electric power system; Flow network; Power (physics); Bus network; Matrix (chemical analysis); Set (abstract data type); Algorithm; Mathematics; System bus","score_opus":0.00764439158587871,"score_gpt":0.19930127205171727,"score_spread":0.19165688046583856,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151027979","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0071889414,0.00031346653,0.97412217,0.0000422729,0.0052395,0.000424012,0.000011025735,0.0009719146,0.011686701],"genre_scores_gemma":[0.9973081,0.00014687188,0.000108087435,0.00002302138,0.00002907926,0.00013653011,0.0000045984775,0.00007149881,0.0021722373],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986901,0.00005792653,0.0003942783,0.00023648418,0.0002929674,0.00032819502],"domain_scores_gemma":[0.99929845,0.000049177837,0.00004622292,0.00041225136,0.00008524173,0.0001086811],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016665261,0.00022475596,0.00022016974,0.0002712468,0.00010673057,0.00007932107,0.00016235754,0.00015953094,0.000091429436],"category_scores_gemma":[0.0000021497824,0.00023915984,0.00008105715,0.0006132719,0.000017276003,0.0002565463,2.7933075e-7,0.00019941192,0.0005355298],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015307192,0.00006454436,0.000027254053,0.000052881547,0.000091159694,0.000017800208,0.00031248265,0.99578047,0.0013176376,0.00012814777,0.0015544579,0.0006378406],"study_design_scores_gemma":[0.0017198314,0.00035250024,0.00019275196,0.00037925394,0.00011839705,0.00089613855,0.0003344538,0.90991575,0.017873893,0.000020614827,0.06682145,0.0013749824],"about_ca_topic_score_codex":0.000050602088,"about_ca_topic_score_gemma":0.000015871032,"teacher_disagreement_score":0.99011916,"about_ca_system_score_codex":0.00026300226,"about_ca_system_score_gemma":0.000022379254,"threshold_uncertainty_score":0.9752655},"labels":[],"label_agreement":null},{"id":"W2151066229","doi":"10.1109/59.867139","title":"Generation scheduling and the switching curve law","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Lagrangian relaxation; Scheduling (production processes); Mathematical optimization; Computer science; Dual (grammatical number); Electric power system; Power (physics); Law; Mathematics; Mathematical economics; Political science; Physics","score_opus":0.010756387473722682,"score_gpt":0.20234949841345587,"score_spread":0.1915931109397332,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151066229","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021671023,0.0009024367,0.96598506,0.00006098675,0.0018735067,0.00047228206,0.000005976739,0.00036838534,0.008660348],"genre_scores_gemma":[0.99892676,0.00014881538,0.00021925225,0.000056527097,0.000045474004,0.00010114804,0.0000017847987,0.000044963344,0.0004552577],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99892974,0.00012548424,0.0003364201,0.00019411146,0.00019979778,0.00021445108],"domain_scores_gemma":[0.9995197,0.000086022905,0.000031860694,0.0002712093,0.000032782267,0.000058436854],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036572426,0.00017923274,0.00020614486,0.00007876745,0.00028054178,0.0001817084,0.00009870153,0.00010228623,0.000058141548],"category_scores_gemma":[0.0000015819826,0.00014171838,0.000059435202,0.00022490387,0.000030936222,0.00025167226,2.6970113e-7,0.00023513589,0.00007778199],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017424221,0.00001245714,0.0000011137937,0.000027361437,0.00006695376,0.0000013533861,0.000788816,0.9956557,0.0009886164,0.0013344061,0.000078696394,0.0010271145],"study_design_scores_gemma":[0.0008374605,0.000028724624,0.0000024421179,0.00006673767,0.000034472607,0.00006308024,0.000069560556,0.99432147,0.0022162732,0.000011045671,0.002152096,0.00019662463],"about_ca_topic_score_codex":0.00017814641,"about_ca_topic_score_gemma":0.000045709592,"teacher_disagreement_score":0.97725576,"about_ca_system_score_codex":0.0000788365,"about_ca_system_score_gemma":0.000009895411,"threshold_uncertainty_score":0.57791084},"labels":[],"label_agreement":null},{"id":"W2151705052","doi":"","title":"Models for electricity market efficiency and bidding strategy analysis","year":2005,"lang":"en","type":"dissertation","venue":"Texas ScholarWorks (Texas Digital Library)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Independent Electricity System Operator; China Scholarship Council; Natural Environment Research Council; Tower Cancer Research Foundation","keywords":"Bidding; Electricity market; Electricity; Industrial organization; Environmental economics; Microeconomics; Business; Economics; Engineering; Electrical engineering","score_opus":0.007427637144534899,"score_gpt":0.20797735388403701,"score_spread":0.20054971673950212,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151705052","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.104180716,0.024477212,0.20488311,0.000033677028,0.0007676937,0.002873859,0.0009252089,0.0033261653,0.6585323],"genre_scores_gemma":[0.959794,0.00084155856,0.001633076,0.000029317569,0.0002717764,0.00007640137,0.0057021477,0.00035094653,0.031300776],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9968116,0.000050819,0.00093086716,0.0008731851,0.00046617293,0.00086732063],"domain_scores_gemma":[0.9985195,0.00027072418,0.0002794798,0.0005317888,0.000106238556,0.0002923029],"candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.00022414386,0.0008118765,0.0009696909,0.0015286299,0.00016161107,0.0023593544,0.00058232446,0.0008549236,0.00026878438],"category_scores_gemma":[0.000077873745,0.0008809666,0.0004113531,0.0031046064,0.000025621846,0.005511381,0.000046882,0.0008582432,0.00003208213],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002987134,0.000240432,0.0045502605,0.0011941916,0.003045571,0.000024741357,0.00010883344,0.91982794,0.00001572622,0.0030618683,0.027609404,0.040022314],"study_design_scores_gemma":[0.0005764124,0.00012449341,0.0029374592,0.00021040972,0.00082084513,0.000007523747,0.000027092316,0.98996574,0.00037800072,0.0011069488,0.0025478825,0.0012972219],"about_ca_topic_score_codex":0.000003322494,"about_ca_topic_score_gemma":0.000011179006,"teacher_disagreement_score":0.8556133,"about_ca_system_score_codex":0.00014515177,"about_ca_system_score_gemma":0.0001387748,"threshold_uncertainty_score":0.9993641},"labels":[],"label_agreement":null},{"id":"W2152585623","doi":"10.1109/tpwrs.2003.810676","title":"Reconciling social welfare, agent profits, and consumer payments in electricity pools","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Microeconomics; Economics; Revenue; Electricity; Profit (economics); Electricity market; Marginal cost; Marginal profit; Payment; Transfer payment; Schedule; Social Welfare; Welfare; Engineering; Market economy; Finance","score_opus":0.012374998286326709,"score_gpt":0.21533427865897367,"score_spread":0.20295928037264696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152585623","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.117937505,0.0014115847,0.8684786,0.00006131828,0.0038337135,0.0015212407,0.00003963264,0.0004930558,0.006223348],"genre_scores_gemma":[0.9992176,0.00008353153,0.00009277761,0.000017040295,0.0000070460005,0.00017964999,0.0000021310518,0.000053580334,0.0003466322],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983439,0.00018125835,0.0005075227,0.00030105095,0.000250036,0.00041627145],"domain_scores_gemma":[0.9995632,0.000050950963,0.00006357043,0.0001780883,0.000054840333,0.00008934967],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00036790222,0.00025101422,0.00032950542,0.00032322583,0.00016274369,0.00007610758,0.00008295352,0.0001923096,0.000034595836],"category_scores_gemma":[0.000008005359,0.0002716921,0.00005824077,0.0005749927,0.000018168419,0.00018203977,4.1320578e-7,0.0003136844,0.0000259625],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029069086,0.0014877933,0.007078299,0.0025751605,0.0020867009,0.0001984644,0.010782166,0.93334466,0.016456999,0.0066627623,0.00601786,0.01301846],"study_design_scores_gemma":[0.022993008,0.0017495446,0.0063850624,0.0018235494,0.00076543423,0.0013495074,0.0044299774,0.64709073,0.17341483,0.00014264614,0.13047458,0.00938111],"about_ca_topic_score_codex":0.00005186424,"about_ca_topic_score_gemma":0.000029802477,"teacher_disagreement_score":0.8812801,"about_ca_system_score_codex":0.00039161186,"about_ca_system_score_gemma":0.00003550115,"threshold_uncertainty_score":0.99997354},"labels":[],"label_agreement":null},{"id":"W2152717061","doi":"10.1109/tpwrs.2002.804955","title":"Combined pool/bilateral dispatch. II. Curtailment of firm and nonfirm contracts","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Bidding; Revenue; Microeconomics; Economic dispatch; Payment; Economics; Industrial organization; Business; Commodity; Power (physics); Electric power system; Finance","score_opus":0.007939023995683081,"score_gpt":0.18135859198546633,"score_spread":0.17341956798978325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152717061","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16429155,0.0010104257,0.82462806,0.000089809546,0.004478914,0.0010388946,0.00008328286,0.0005040128,0.0038750346],"genre_scores_gemma":[0.99846077,0.00013298701,0.00006949134,0.000014899372,0.000011207542,0.00008168021,0.0000028869401,0.000055322347,0.00117077],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985713,0.000051900883,0.000543681,0.00023786594,0.00027919046,0.0003160969],"domain_scores_gemma":[0.9993021,0.000070087044,0.000090544265,0.00033454123,0.00007017897,0.0001325472],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013019798,0.00025775124,0.00039472926,0.00020789394,0.00011358639,0.000045735447,0.000119457356,0.00015171414,0.000117725234],"category_scores_gemma":[0.0000025770178,0.00025592014,0.00008193975,0.0002744087,0.0000331616,0.00020815757,0.0000010313818,0.00019380881,0.000031526215],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011273045,0.0009996112,0.0004296625,0.0007784347,0.0008336633,0.00003738083,0.0056712157,0.97102267,0.011687449,0.00035609645,0.0063383263,0.0017327523],"study_design_scores_gemma":[0.0033924151,0.0011944035,0.0007075171,0.0006137956,0.00016326479,0.00011268729,0.00019210402,0.9699869,0.017422229,0.000006535284,0.005313771,0.0008943697],"about_ca_topic_score_codex":0.00008468256,"about_ca_topic_score_gemma":0.000011882994,"teacher_disagreement_score":0.8341692,"about_ca_system_score_codex":0.000116210824,"about_ca_system_score_gemma":0.000007513876,"threshold_uncertainty_score":0.99998933},"labels":[],"label_agreement":null},{"id":"W2152974989","doi":"10.1109/tpwrs.2002.1007890","title":"Development of a hybrid model for electrical power spot prices","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Actua; Western University","funders":"","keywords":"Spot contract; Electricity; Electricity market; Electricity price; Economics; Econometrics; Stochastic modelling; Electricity pricing; Forward contract; Electricity generation; Electric power system; Electric power; Forward price; Computer science; Microeconomics; Power (physics); Financial economics; Engineering; Electrical engineering; Finance","score_opus":0.01820611343287834,"score_gpt":0.20982148705083412,"score_spread":0.19161537361795578,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152974989","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009020033,0.0004414047,0.98582566,0.000008859717,0.0012582345,0.0008350207,0.00003863891,0.00036792207,0.0022042554],"genre_scores_gemma":[0.99039036,0.000024227267,0.008161739,0.000009688045,0.000007753626,0.00032325482,0.000002734874,0.000077590725,0.0010026604],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982383,0.000022758404,0.0007093915,0.0002772782,0.00034505365,0.000407201],"domain_scores_gemma":[0.9992669,0.00008525323,0.000101834565,0.00031438287,0.00012262427,0.00010896093],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002010644,0.00026669816,0.00037785206,0.00035803026,0.000110919886,0.000038837166,0.00019982038,0.00010504078,0.00004579972],"category_scores_gemma":[0.0000045584443,0.00027240854,0.0001309893,0.00040237026,0.000014611874,0.00017227205,5.745693e-7,0.00016393723,0.000051129093],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002578547,0.00020050237,9.87979e-7,0.000146981,0.00019130029,0.0000020982854,0.0015590434,0.99054575,0.004552678,0.00014401569,0.0019707512,0.0006601262],"study_design_scores_gemma":[0.0004793157,0.00009284115,0.0000014210555,0.00007568748,0.00002915458,0.00002925778,0.00003218081,0.95822394,0.03775611,0.0000029718994,0.0029902547,0.00028688455],"about_ca_topic_score_codex":0.0000026339562,"about_ca_topic_score_gemma":0.0000028024638,"teacher_disagreement_score":0.98137033,"about_ca_system_score_codex":0.00026255802,"about_ca_system_score_gemma":0.000040664563,"threshold_uncertainty_score":0.9999728},"labels":[],"label_agreement":null},{"id":"W2153268897","doi":"10.1109/tpwrs.2007.907375","title":"Hybrid Particle Swarm Optimization Approach for Solving the Discrete OPF Problem Considering the Valve Loading Effects","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":237,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Mathematical optimization; Particle swarm optimization; Sequential quadratic programming; Robustness (evolution); Electric power system; Quadratic programming; Computer science; Optimization problem; Mathematics; Power (physics)","score_opus":0.009270539254496592,"score_gpt":0.21157072149318967,"score_spread":0.2023001822386931,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153268897","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022694394,0.00060109614,0.9903466,0.000043947995,0.0022033637,0.0026581849,0.000012811079,0.0005615832,0.0013029897],"genre_scores_gemma":[0.991548,0.000022178396,0.0074395533,0.000036280708,0.000054727752,0.0006285587,0.000005590538,0.000109509,0.00015559551],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99802494,0.00010323884,0.000590214,0.00032945248,0.00033191976,0.0006202146],"domain_scores_gemma":[0.9983702,0.00080835127,0.00012305213,0.00049115793,0.00010455855,0.000102712904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001310811,0.00031118182,0.00028887088,0.00012209851,0.0005962793,0.00025153236,0.00027435023,0.000104179504,0.000004195135],"category_scores_gemma":[0.000020930227,0.00021817756,0.00020586603,0.00042278282,0.000050074705,0.00029720634,0.000002082037,0.0003044485,0.000007909851],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001973696,0.000030022149,0.000006329832,0.00022902866,0.00018529949,0.0000017020163,0.0009923086,0.9965489,0.0014494784,0.00015572466,0.00019721703,0.00018425814],"study_design_scores_gemma":[0.00049954676,0.000081993625,0.000004155374,0.00013916357,0.000111180896,0.000074182724,0.00036055766,0.9492928,0.048945844,0.000006761797,0.00021134618,0.00027246666],"about_ca_topic_score_codex":0.00003213129,"about_ca_topic_score_gemma":0.0000059226095,"teacher_disagreement_score":0.98927855,"about_ca_system_score_codex":0.00025800357,"about_ca_system_score_gemma":0.000027901282,"threshold_uncertainty_score":0.88970226},"labels":[],"label_agreement":null},{"id":"W2154935705","doi":"10.1109/icsssm.2010.5530272","title":"Managing financial risks for natural gas-fired power plants","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Deregulation; Electricity; Valuation (finance); Natural gas; Electricity generation; Business; Environmental economics; Risk management; Electricity price; Natural gas prices; Electric power industry; Natural resource economics; Finance; Industrial organization; Power (physics); Economics; Engineering; Waste management; Electrical engineering; Market economy","score_opus":0.0073557094537843055,"score_gpt":0.2177103739311182,"score_spread":0.2103546644773339,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2154935705","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5117234,0.00037552608,0.4216006,0.00023207448,0.010774669,0.001047195,0.000024833382,0.0017977053,0.05242396],"genre_scores_gemma":[0.9931829,0.000008555257,0.006039631,0.000042280295,0.000121891804,0.000027837405,0.000015669872,0.00002945885,0.000531764],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938583,0.0000044654876,0.00014566354,0.00012236895,0.000084754814,0.00025689122],"domain_scores_gemma":[0.99972546,0.00004030729,0.000019097117,0.00014784763,0.000026723172,0.00004057496],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009706148,0.00010914029,0.00011067482,0.00007965857,0.00004924414,0.000031993364,0.00011296205,0.00008640513,0.000048846276],"category_scores_gemma":[0.000046299647,0.00010514868,0.00003985096,0.000092592796,0.000006106879,0.00011938404,0.0000102504755,0.00016042849,0.000030373525],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003152124,0.00018311672,0.0047835326,0.00072939834,0.0004221347,0.00007113375,0.0027959095,0.085339345,0.26395878,0.032849327,0.392193,0.21635911],"study_design_scores_gemma":[0.0010582095,0.000042614152,0.003109073,0.000025760175,0.00001508177,0.00003529142,0.00002185967,0.9510225,0.025495308,0.0008603203,0.017813483,0.00050049415],"about_ca_topic_score_codex":0.000013672408,"about_ca_topic_score_gemma":0.00007329739,"teacher_disagreement_score":0.86568314,"about_ca_system_score_codex":0.000025296353,"about_ca_system_score_gemma":0.000011923175,"threshold_uncertainty_score":0.4287839},"labels":[],"label_agreement":null},{"id":"W2156474867","doi":"10.1109/tpwrs.2009.2023266","title":"Oligopolistic Competition of Gencos in Reactive Power Ancillary Service Provisions","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"AC power; Oligopoly; Electric power system; Procurement; Market power; Electricity market; Operator (biology); Incentive; Industrial organization; Business; Economics; Microeconomics; Computer science; Power (physics); Engineering; Cournot competition; Electricity; Electrical engineering; Monopoly; Voltage","score_opus":0.007386658032236702,"score_gpt":0.2075960731468953,"score_spread":0.2002094151146586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156474867","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048174776,0.00029522838,0.9349664,0.000074095995,0.0018485779,0.0010154439,0.000098478115,0.0003989778,0.013128057],"genre_scores_gemma":[0.9994901,0.000035490622,0.00021734706,0.00005190633,0.000011888395,0.000060660277,0.0000083897985,0.000042117088,0.000082118044],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99829715,0.0001023654,0.00064525596,0.00027014394,0.0003468354,0.00033822918],"domain_scores_gemma":[0.9990957,0.0000909697,0.00010565997,0.00042852518,0.00017887825,0.00010030668],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020649564,0.0002598239,0.0004165673,0.0005201066,0.000060508435,0.000031080413,0.00018197381,0.00019473584,0.000036424783],"category_scores_gemma":[0.000005237452,0.000278441,0.00008271767,0.0010514024,0.000016574353,0.00027793553,5.7037516e-7,0.00029131095,0.000059488786],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006728729,0.00038747521,0.000024711402,0.00022339406,0.00007285335,0.000019724108,0.0020284504,0.97795707,0.017798636,0.0008054281,0.00038656124,0.0002283843],"study_design_scores_gemma":[0.006214995,0.002702495,0.0065908264,0.004486554,0.00028076573,0.00053602987,0.0034012177,0.88900274,0.07768114,0.00027396154,0.005656071,0.0031732267],"about_ca_topic_score_codex":0.00016337918,"about_ca_topic_score_gemma":0.00007127316,"teacher_disagreement_score":0.9513153,"about_ca_system_score_codex":0.0003856991,"about_ca_system_score_gemma":0.000061091014,"threshold_uncertainty_score":0.9999668},"labels":[],"label_agreement":null},{"id":"W2157253837","doi":"10.1109/pes.2011.6039776","title":"Estimating and visualizing the impact of wind forecast errors on system operations","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Wind power; Reliability (semiconductor); Electric power system; Computer science; Interval (graph theory); Reliability engineering; Term (time); Stability (learning theory); Visualization; Wind speed; Wind power forecasting; Power (physics); Meteorology; Data mining; Engineering; Mathematics; Machine learning","score_opus":0.023506188391811345,"score_gpt":0.2540745094050193,"score_spread":0.23056832101320796,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157253837","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73227686,0.000060071372,0.22889549,0.0000029156347,0.00012863644,0.00026072792,0.0000026776052,0.00018521791,0.03818741],"genre_scores_gemma":[0.9936232,8.646615e-7,0.0063107256,0.0000017645101,0.000017805543,0.000005581163,0.0000014951478,0.000016928812,0.000021645048],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956435,0.000021911113,0.00017659875,0.00006722244,0.00006343204,0.000106495034],"domain_scores_gemma":[0.99976707,0.000032203898,0.000022203663,0.00012449875,0.000027340924,0.000026703025],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013960004,0.00007871614,0.000100238314,0.000059778446,0.000059781683,0.00001784948,0.00005804412,0.000030739007,0.000013811296],"category_scores_gemma":[0.000017469707,0.000051351242,0.000026840926,0.0001445747,0.000010385835,0.000097510514,0.000008802814,0.000047749483,0.000004130366],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000027395517,0.0000087973185,0.0010710721,0.00006578166,0.000056891946,6.618818e-7,0.0021976302,0.9910854,0.0006697001,0.0039847842,0.000089092755,0.0007674399],"study_design_scores_gemma":[0.00008306027,0.00006724859,0.0022707202,0.000069849666,0.000008682081,0.000015579622,0.00028840345,0.99580455,0.0013280326,0.0000046844166,4.2192292e-7,0.00005876381],"about_ca_topic_score_codex":0.0002683675,"about_ca_topic_score_gemma":0.000016132277,"teacher_disagreement_score":0.26134634,"about_ca_system_score_codex":0.000057950223,"about_ca_system_score_gemma":0.000009902549,"threshold_uncertainty_score":0.20940429},"labels":[],"label_agreement":null},{"id":"W2157542074","doi":"10.5539/mas.v5n3p111","title":"An Economic Based Approach for Optimal and Secure Reactive Power Provision in Deregulated Environments","year":2011,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"AC power; Electricity market; Schedule; Market clearing; Computer science; Electric power system; Mathematical optimization; Payment; Nonlinear programming; Electricity; Business; Voltage; Power (physics); Microeconomics; Economics; Nonlinear system; Electrical engineering; Engineering","score_opus":0.008433943738252079,"score_gpt":0.18876765750347949,"score_spread":0.18033371376522742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157542074","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25845918,0.000013954687,0.73858136,0.0000010003987,0.000023938128,0.00052392227,0.000003161795,0.000052422634,0.0023410993],"genre_scores_gemma":[0.9516124,0.0000010021666,0.048239626,0.000007654273,0.00000428404,0.00010081387,0.000008230709,0.000020742254,0.000005214277],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990984,0.0000073387514,0.00014503162,0.0003752269,0.00010937335,0.00026463132],"domain_scores_gemma":[0.9996642,0.000009506655,0.000033766668,0.00020969867,0.0000057935813,0.00007704797],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029937353,0.00012010706,0.00011513756,0.00015357487,0.00006405925,0.00003425414,0.00019189923,0.00006548356,0.0000042905467],"category_scores_gemma":[0.000002684182,0.00012375857,0.000009823684,0.00013050777,0.00007959035,0.0003008964,0.000018378785,0.000066011016,0.00000210687],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005840052,0.000074135125,0.00023317624,0.000020640418,0.0000046203895,4.3430677e-7,0.0028528688,0.6672876,0.32698628,0.00038247684,0.0000050981484,0.0020943123],"study_design_scores_gemma":[0.00039675026,0.000041984084,0.0013718844,0.0000036931922,0.0000028306672,0.0000011656143,0.000053010655,0.9618224,0.036050502,0.00011001004,0.0000053861017,0.00014036948],"about_ca_topic_score_codex":0.0000063494576,"about_ca_topic_score_gemma":0.0000020059022,"teacher_disagreement_score":0.69315326,"about_ca_system_score_codex":0.00020011823,"about_ca_system_score_gemma":0.000036876227,"threshold_uncertainty_score":0.50467277},"labels":[],"label_agreement":null},{"id":"W2158376392","doi":"10.1287/opre.2013.1190","title":"Optimal Economic Dispatch and Risk Management of Thermal Power Plants in Deregulated Markets","year":2013,"lang":"en","type":"article","venue":"Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Mathematical optimization; Volatility (finance); Valuation (finance); Econometrics; Risk management; Economics; Spot contract; Computer science; Mathematics; Financial economics; Futures contract","score_opus":0.010377658184469951,"score_gpt":0.2581958759110573,"score_spread":0.24781821772658735,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2158376392","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99037766,0.00025839265,0.0015106098,0.000025978423,0.000037829217,0.00050567073,0.000009315023,0.000023493943,0.007251052],"genre_scores_gemma":[0.9962276,0.0005712336,0.0026151114,6.1456024e-7,0.000006004471,0.000108732616,0.000011618948,0.000016428827,0.0004426297],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921733,0.00011012839,0.00019513344,0.00012825777,0.00012605097,0.000223109],"domain_scores_gemma":[0.9996938,0.000041920594,0.0000069026164,0.00017323399,0.000041138454,0.000042979947],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003990872,0.000067695946,0.000093432405,0.00020469293,0.00006066925,0.00006769513,0.00010188325,0.000048663023,0.0003741813],"category_scores_gemma":[0.000007177375,0.00006648563,0.000009748225,0.00015173809,0.000026800033,0.0002044407,0.00004528618,0.00013570221,0.00008973196],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000095263895,0.000028249528,0.008118199,0.0000454281,0.0000712488,0.0000037142897,0.00039457198,0.9851041,0.0013653256,0.0003215052,0.00065638905,0.003881753],"study_design_scores_gemma":[0.00031967036,0.000021308811,0.123131186,0.00003849995,0.00000224336,0.0000021279834,0.00016849469,0.8753594,0.00083501515,0.000008749423,0.000038487786,0.00007481859],"about_ca_topic_score_codex":0.0004634046,"about_ca_topic_score_gemma":0.00012472163,"teacher_disagreement_score":0.11501299,"about_ca_system_score_codex":0.000097282864,"about_ca_system_score_gemma":0.000016071941,"threshold_uncertainty_score":0.4097023},"labels":[],"label_agreement":null},{"id":"W2158598170","doi":"10.1109/tpwrs.2005.851931","title":"One-Year Deferral Method for Estimating Avoided Transmission and Distribution Costs","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Manitoba Hydro","funders":"","keywords":"Deferral; Planner; Reliability engineering; Reduction (mathematics); Electric power system; Transmission (telecommunications); Computer science; Mathematical optimization; Control theory (sociology); Engineering; Power (physics); Mathematics; Economics; Control (management); Telecommunications","score_opus":0.013195480532484226,"score_gpt":0.2513885772609969,"score_spread":0.23819309672851266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2158598170","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010192838,0.00026717075,0.9953199,0.00008293259,0.0012821774,0.00092586124,0.00011719323,0.00052789104,0.00045756972],"genre_scores_gemma":[0.9164064,0.000022635963,0.083049215,0.000012494658,0.000042900087,0.00021477733,0.000026407019,0.00006279183,0.00016236622],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985989,0.000093676914,0.00046150942,0.00028807632,0.00022156526,0.00033627707],"domain_scores_gemma":[0.99932534,0.00017443336,0.000062119456,0.00021491924,0.000081865874,0.00014130394],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003938196,0.00023067922,0.00030198495,0.00013675018,0.00020080266,0.00009671013,0.000093558556,0.00018832258,0.000014044484],"category_scores_gemma":[0.000007916777,0.00025395042,0.00009302563,0.0002474733,0.000016734744,0.00027492788,4.1972842e-7,0.00020480424,0.000018815537],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057877474,0.000073279734,0.0000027323993,0.00026265415,0.000109493965,4.686744e-7,0.00048823658,0.9677593,0.0048719635,0.00026710602,0.0007426224,0.02536428],"study_design_scores_gemma":[0.00086242263,0.00011741246,0.000011365722,0.00023385907,0.00006783002,0.000023612261,0.00006479749,0.9839897,0.011262582,0.000008522917,0.0030751508,0.00028270995],"about_ca_topic_score_codex":0.000030234014,"about_ca_topic_score_gemma":0.000008888001,"teacher_disagreement_score":0.91538715,"about_ca_system_score_codex":0.0003706798,"about_ca_system_score_gemma":0.000021836297,"threshold_uncertainty_score":0.9999913},"labels":[],"label_agreement":null},{"id":"W2158909241","doi":"","title":"Multiple objective reactive power planning using genetic algorithms","year":2007,"lang":"en","type":"dissertation","venue":"Memorial University Research Repository (Memorial University)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Memorial University of Newfoundland","keywords":"Mathematical optimization; Sorting; Multi-objective optimization; Computer science; Evolutionary algorithm; Heuristic; Optimization problem; Genetic algorithm; Pareto principle; Set (abstract data type); AC power; Power (physics); Algorithm; Mathematics","score_opus":0.02158838127200634,"score_gpt":0.2683543250199456,"score_spread":0.24676594374793925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2158909241","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6500454,0.00047080318,0.015665676,0.0000042191505,0.0400251,0.002645107,0.00011347597,0.0011801289,0.2898501],"genre_scores_gemma":[0.92604125,0.00019843425,0.0049570054,0.0000032179457,0.00886307,0.0000020059583,0.00065659214,0.00044247988,0.058835976],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9942851,0.00089535024,0.00050031,0.0012069528,0.0017134561,0.00139883],"domain_scores_gemma":[0.99613106,0.00068356807,0.00032169392,0.00079048274,0.0015267774,0.0005464362],"candidate_categories":["metaepi_narrow","sts","research_integrity"],"consensus_categories":["research_integrity"],"category_scores_codex":[0.00081429887,0.0007500704,0.00088824856,0.0037918317,0.0014912984,0.00020876317,0.001349374,0.0014707377,0.000042727814],"category_scores_gemma":[0.00023328385,0.001053458,0.0003781388,0.0035042579,0.00021773533,0.00094189175,0.00022020131,0.0023373251,0.000045143544],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.04406798,0.0017089137,0.0037341386,0.00302791,0.010666727,0.08449369,0.049327377,0.45459458,0.31404427,0.0020651722,0.025963524,0.0063057193],"study_design_scores_gemma":[0.0360158,0.004158431,0.008326077,0.005044118,0.0039457716,0.0007982959,0.15601024,0.23213081,0.26875302,0.0002410302,0.2703141,0.014262286],"about_ca_topic_score_codex":0.0020233693,"about_ca_topic_score_gemma":0.00025908844,"teacher_disagreement_score":0.27599582,"about_ca_system_score_codex":0.0063772793,"about_ca_system_score_gemma":0.0012883045,"threshold_uncertainty_score":0.9999643},"labels":[],"label_agreement":null},{"id":"W2158930128","doi":"","title":"Probabilistic Model and Solution Algorithm for the Electricity Retailers in the Italian Market","year":2011,"lang":"en","type":"article","venue":"Algorithmic operations research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bidding; Simulated annealing; Electricity market; Computer science; Probabilistic logic; Electricity; Mathematical optimization; Portfolio; Algorithm; Economics; Mathematics; Artificial intelligence; Microeconomics; Finance; Engineering","score_opus":0.0691444894806862,"score_gpt":0.297606831795214,"score_spread":0.22846234231452783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2158930128","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0044701807,0.00080357416,0.9869861,0.00048403247,0.00011297682,0.0031623952,0.000031331023,0.00008747832,0.0038619293],"genre_scores_gemma":[0.95098406,0.00045576904,0.04496307,0.000036798017,0.00010688235,0.0022817736,0.0000263908,0.000046766047,0.0010984837],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984821,0.00024693765,0.00025745906,0.00022559329,0.0003333258,0.00045459697],"domain_scores_gemma":[0.9990095,0.00037060963,0.000009603627,0.00033941033,0.00022828771,0.000042612144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026243702,0.000122008336,0.000113314585,0.00021442598,0.00046649438,0.0001352501,0.00034493482,0.000089274545,0.000021694585],"category_scores_gemma":[0.00022637058,0.00008238007,0.00002947056,0.00083124527,0.00010139504,0.00024116303,0.000031482123,0.00037725834,0.0000071957247],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050900337,0.00035088015,0.00012776759,0.00021340647,0.00021742466,0.00001156809,0.017620955,0.65924937,0.00081375823,0.013865491,0.027863886,0.2796146],"study_design_scores_gemma":[0.00022978836,0.000065614775,0.000376899,0.000010524947,0.000011119071,0.000013686906,0.00021712987,0.9981958,0.000068004505,0.00054868823,0.00016228057,0.000100407655],"about_ca_topic_score_codex":0.00028485272,"about_ca_topic_score_gemma":0.00041387614,"teacher_disagreement_score":0.9465139,"about_ca_system_score_codex":0.0001836964,"about_ca_system_score_gemma":0.00010415722,"threshold_uncertainty_score":0.35879448},"labels":[],"label_agreement":null},{"id":"W2159530637","doi":"10.1109/tpwrs.2003.820709","title":"Coordination in Markets With Nonconvexities as a Mathematical Program With Equilibrium Constraints—Part II: Case Studies","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Mathematical optimization; Lagrange multiplier; Economic dispatch; Multiplier (economics); Electric power system; Power system simulation; Electricity market; Computer science; Market clearing; Marginal cost; Electricity; Mathematics; Economics; Power (physics)","score_opus":0.01130599141994049,"score_gpt":0.24032288325947163,"score_spread":0.22901689183953114,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159530637","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33604795,0.00032726183,0.6514772,0.00013929076,0.001120626,0.0026244235,0.000028769467,0.0011404469,0.0070940307],"genre_scores_gemma":[0.9973025,0.000010289762,0.0010551307,0.00001100985,0.000013021993,0.00092943053,0.0000027536034,0.00007934695,0.0005965503],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99826974,0.00007935085,0.0005278363,0.00032329836,0.00037469398,0.0004250626],"domain_scores_gemma":[0.99920696,0.00011503728,0.00008372466,0.0003199344,0.00016366526,0.000110698726],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002920283,0.00035510515,0.00047698332,0.00036229848,0.00012563753,0.00009275172,0.000100695535,0.0001405315,0.000034190984],"category_scores_gemma":[0.0000075188354,0.00029033085,0.000052188814,0.0006628155,0.00017644785,0.00036067027,0.0000011965254,0.0002835529,0.000041390733],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028953076,0.00091333,0.000038045695,0.0011948156,0.0009668647,0.0029819321,0.008588358,0.9821776,0.00019671708,0.0015568819,0.0002481827,0.0008477299],"study_design_scores_gemma":[0.04379834,0.024987582,0.00009617905,0.026857732,0.0015868881,0.19845255,0.074020624,0.5747067,0.041618608,0.00061869295,0.003931529,0.009324623],"about_ca_topic_score_codex":0.000052221414,"about_ca_topic_score_gemma":0.00013494842,"teacher_disagreement_score":0.6612545,"about_ca_system_score_codex":0.0004976248,"about_ca_system_score_gemma":0.00010693497,"threshold_uncertainty_score":0.9999549},"labels":[],"label_agreement":null},{"id":"W2159712218","doi":"10.1109/poweri.2006.1632633","title":"A spinning reserve market considering security and biddable reserve","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power India Conference","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Spinning; Procurement; Reserve requirement; Scheme (mathematics); Nature reserve; Computer science; Business; Engineering; Economics; Central bank; Mechanical engineering; Mathematics; Monetary economics; Marketing","score_opus":0.008215161649154226,"score_gpt":0.19755736223826328,"score_spread":0.18934220058910906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159712218","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7783055,0.0021409688,0.015070273,0.0001016525,0.00090997614,0.00057213864,0.000058254536,0.0007902289,0.20205103],"genre_scores_gemma":[0.9976542,0.00007045857,0.0013829616,0.000029622306,0.000077981545,0.000036804307,0.000014092054,0.000053204585,0.00068069046],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982678,0.0000857118,0.0004316845,0.0003652715,0.0002758274,0.00057370495],"domain_scores_gemma":[0.9991517,0.00012013685,0.00008777998,0.00038561205,0.00014093968,0.00011381124],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004305917,0.0002844617,0.00031335853,0.00023689064,0.00011410305,0.00021400453,0.00021934166,0.00019496708,0.00026488292],"category_scores_gemma":[0.00007065082,0.00031878584,0.00004245479,0.0004338428,0.00006564889,0.00038495718,0.000052716052,0.00032548292,0.0000357421],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024657432,0.0003839623,0.33840585,0.0021838213,0.0006336798,0.0009923093,0.008449903,0.0536361,0.045010038,0.015825689,0.53222835,0.0020037312],"study_design_scores_gemma":[0.0050301473,0.00043743118,0.05876409,0.0020520466,0.00016145298,0.0005139207,0.00075414445,0.8141736,0.06317551,0.009852401,0.040439457,0.0046458063],"about_ca_topic_score_codex":0.0008018069,"about_ca_topic_score_gemma":0.0004796027,"teacher_disagreement_score":0.7605375,"about_ca_system_score_codex":0.00010696088,"about_ca_system_score_gemma":0.00007895424,"threshold_uncertainty_score":0.99992645},"labels":[],"label_agreement":null},{"id":"W2160541617","doi":"10.1504/ijgei.1997.063321","title":"Monitoring new technological developments in the electricity industry: an international perspective","year":2014,"lang":"en","type":"article","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Center for Interuniversity Research and Analysis on Organizations; Université du Québec à Montréal; Polytechnique Montréal","funders":"","keywords":"Delphi method; Electricity; Technological change; Perspective (graphical); Delphi; Industrial organization; Electric power industry; Mains electricity; Business; Engineering; Environmental economics; Economics; Computer science; Electrical engineering","score_opus":0.010710503574376598,"score_gpt":0.23390305947281415,"score_spread":0.22319255589843756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2160541617","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31668717,0.00033507645,0.67454255,0.0010499537,0.00024514465,0.0006224352,0.0000027105482,0.0013967087,0.0051182657],"genre_scores_gemma":[0.9725474,0.00008797602,0.026660748,0.00017501101,0.00018350717,0.0002081981,0.000006401968,0.000041999694,0.00008876036],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983292,0.00014055865,0.0003382165,0.00031118,0.00036300306,0.00051779754],"domain_scores_gemma":[0.99919707,0.000086736334,0.000073082105,0.0004434367,0.00007428198,0.00012540481],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007904273,0.0002498427,0.00020909566,0.00051273743,0.000093644296,0.00015822634,0.0008598461,0.00049975264,0.000008376761],"category_scores_gemma":[0.00035361075,0.00022073656,0.000045203607,0.0010838847,0.000027900856,0.0004248958,0.000060334325,0.0010014182,0.000007924334],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007015333,0.00048871763,0.5993783,0.00002797278,0.00016124055,0.00006989778,0.0032855142,0.117532834,0.01025019,0.10001165,0.0011944496,0.1675291],"study_design_scores_gemma":[0.0009527751,0.00016179071,0.4693013,0.00011483135,0.000021150052,0.00017753271,0.00073248526,0.49937394,0.022629162,0.0034177613,0.0023209478,0.0007962925],"about_ca_topic_score_codex":0.0017103284,"about_ca_topic_score_gemma":0.00036734084,"teacher_disagreement_score":0.65586025,"about_ca_system_score_codex":0.0012333218,"about_ca_system_score_gemma":0.00009530947,"threshold_uncertainty_score":0.90013754},"labels":[],"label_agreement":null},{"id":"W2160807713","doi":"10.1109/tpwrs.2003.810998","title":"Competitive framework for procurement of interruptible load services","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":108,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Procurement; Electric power system; Computer science; Service (business); Load management; Reliability engineering; Electricity market; Operations research; Load factor; Electricity; Power (physics); Business; Engineering; Electrical engineering","score_opus":0.010731505783665524,"score_gpt":0.2308834690714656,"score_spread":0.22015196328780007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2160807713","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008564577,0.00042663768,0.9861016,0.000007396286,0.0032221114,0.0009840856,0.000053719214,0.00022589749,0.008122048],"genre_scores_gemma":[0.9959429,0.000024579114,0.0034135976,0.000013196817,0.000008694887,0.00029148484,0.0000021262003,0.00005254031,0.00025089367],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9987832,0.00005352017,0.00043582005,0.00020210138,0.00027270184,0.00025266336],"domain_scores_gemma":[0.9992434,0.000114003466,0.00009057049,0.00028059215,0.00020757843,0.00006385676],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023453163,0.00019927829,0.00029634265,0.00015829719,0.00005948853,0.00003596466,0.00013408033,0.00014256961,0.00003979519],"category_scores_gemma":[0.0000050131453,0.0002028487,0.0001029598,0.00032244733,0.000015053514,0.00012786115,2.8257864e-7,0.00014645199,0.000025230122],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000086920285,0.00035881958,0.000027580234,0.0027082274,0.0006703296,0.0000024016651,0.0045116222,0.94281816,0.0046495153,0.043622795,0.00035620524,0.00018740857],"study_design_scores_gemma":[0.005292612,0.0030014932,0.000034368935,0.007287198,0.00051488855,0.00017107163,0.0080060195,0.28320184,0.5972204,0.00076133246,0.0918138,0.0026949714],"about_ca_topic_score_codex":0.000019074028,"about_ca_topic_score_gemma":0.00001670317,"teacher_disagreement_score":0.99508643,"about_ca_system_score_codex":0.00024125612,"about_ca_system_score_gemma":0.000043728327,"threshold_uncertainty_score":0.827193},"labels":[],"label_agreement":null},{"id":"W2160808904","doi":"10.1109/pes.2003.1270386","title":"Closed-form solution to calculate generator contributions to loads and line flows in an open access market","year":2004,"lang":"en","type":"article","venue":"2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Tracing; Computation; Computer science; Generator (circuit theory); Electric power transmission; Mathematical optimization; Electric power system; Linear programming; Transmission line; Transmission (telecommunications); Line (geometry); Power (physics); Telecommunications; Electrical engineering; Mathematics; Engineering; Algorithm","score_opus":0.01174616760905839,"score_gpt":0.2805061016743096,"score_spread":0.2687599340652512,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2160808904","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7426088,0.00021556242,0.25143233,0.0002703304,0.002993205,0.0015399782,0.00012834341,0.00060101214,0.0002104238],"genre_scores_gemma":[0.8481955,0.00018236521,0.14860025,0.00071153935,0.0009877214,0.0005389585,0.00011052635,0.00030676127,0.00036635986],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99644625,0.00007812289,0.0009119713,0.00083988695,0.0004257008,0.0012980943],"domain_scores_gemma":[0.99793655,0.000054984364,0.00009905394,0.00064525375,0.0005665326,0.0006976477],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001187178,0.00068575604,0.0006990173,0.00030905745,0.00023534766,0.0006909574,0.0009758842,0.00041468252,0.00002203589],"category_scores_gemma":[0.0003053308,0.00080086966,0.00012421556,0.002084876,0.000022499988,0.001099,0.00023019731,0.00044876288,0.00004696418],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015731202,0.00005069303,0.0001667918,0.00007349576,0.00006794755,0.0000082384295,0.000692754,0.73842835,0.25233528,0.000039202336,0.00798735,0.00013418974],"study_design_scores_gemma":[0.0015885959,0.0001915783,0.0009681047,0.0003103073,0.00004458763,0.000020001362,0.000022804086,0.9491027,0.04436618,0.0000134794445,0.002232935,0.0011387304],"about_ca_topic_score_codex":0.00045720325,"about_ca_topic_score_gemma":0.0002463278,"teacher_disagreement_score":0.21067438,"about_ca_system_score_codex":0.0018175502,"about_ca_system_score_gemma":0.00022069269,"threshold_uncertainty_score":0.99944425},"labels":[],"label_agreement":null},{"id":"W2161495209","doi":"10.29228/mjes.93","title":"A COMPARISON OF ELECTRICITY INDUSTRY REGULATION AND RESTRUCTURING: GREECE AND TURKEY","year":2015,"lang":"tr","type":"article","venue":"Marmara Avrupa araştırmaları dergisi/Marmara Üniversitesi Avrupa Araştırmaları Enstitüsü Avrupa araştırmaları dergisi","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Héma-Québec","funders":"","keywords":"Restructuring; Legislation; Turkish; Electricity; Electric power industry; Business; Politics; Process (computing); Industrial organization; Face (sociological concept); Economic policy; Market economy; Economic system; Economy; Economics; Political science; Finance; Engineering; Computer science","score_opus":0.02228787412751768,"score_gpt":0.2555096896517992,"score_spread":0.23322181552428153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2161495209","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91135776,0.03786574,0.015736341,0.0022050138,0.0064720483,0.007967633,0.0012928599,0.002836115,0.014266491],"genre_scores_gemma":[0.974445,0.007154587,0.008857687,0.00072477973,0.0018386423,0.00031396738,0.0014323092,0.0014029593,0.00383007],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9662792,0.00338101,0.008650344,0.007211803,0.0065744636,0.007903156],"domain_scores_gemma":[0.97701335,0.0024753131,0.005881243,0.005035423,0.0038312671,0.0057634115],"candidate_categories":["metaepi_narrow","sts","scholarly_communication","research_integrity","insufficient_payload"],"consensus_categories":["metaepi_narrow","sts","research_integrity"],"category_scores_codex":[0.0055606016,0.007316019,0.008450161,0.006849897,0.0029082312,0.0027293598,0.004656859,0.0074695763,0.0012079995],"category_scores_gemma":[0.0022745302,0.0088333655,0.0018342662,0.009117074,0.0029364435,0.00912877,0.0034890247,0.01043228,0.00056610716],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0083791725,0.004079447,0.6087282,0.008657639,0.009106062,0.003316772,0.013722511,0.21344337,0.024945423,0.008626839,0.08034283,0.016651763],"study_design_scores_gemma":[0.03587382,0.0038707936,0.27451473,0.005380597,0.009602964,0.005959394,0.005936732,0.53979135,0.033531133,0.000887135,0.06693271,0.017718669],"about_ca_topic_score_codex":0.0017849893,"about_ca_topic_score_gemma":0.00028547327,"teacher_disagreement_score":0.33421344,"about_ca_system_score_codex":0.0038547965,"about_ca_system_score_gemma":0.0025211442,"threshold_uncertainty_score":0.99996924},"labels":[],"label_agreement":null},{"id":"W2162703984","doi":"10.1109/psce.2009.4840193","title":"A novel approach to disco planning in electricity markets: Mathematical model","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Electricity market; Variety (cybernetics); Computer science; Capacity planning; Work (physics); Function (biology); Power flow; Service (business); Term (time); Operations research; Electric power system; Power (physics); Environmental economics; Business; Economics; Engineering; Electrical engineering; Marketing","score_opus":0.014479096685675177,"score_gpt":0.22573945676785806,"score_spread":0.21126036008218288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162703984","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00873052,0.000035782115,0.81115407,0.000034243847,0.000011481125,0.00023355169,7.2031185e-7,0.00024404898,0.17955557],"genre_scores_gemma":[0.8628059,0.0000014780106,0.13668385,0.00008632883,0.0000136868675,0.000022767044,0.0000032561607,0.000017835266,0.00036490647],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99910533,0.000009513762,0.00025310225,0.00016654818,0.00015151424,0.00031397428],"domain_scores_gemma":[0.99971205,0.000026939975,0.000012331859,0.00016120271,0.000012242433,0.00007525942],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019567752,0.00013343146,0.00018476137,0.0002073279,0.000016321068,0.000031719752,0.00013247044,0.00007142439,0.0000054852107],"category_scores_gemma":[0.000041495932,0.00012454309,0.000024323159,0.00059365603,0.000002457998,0.00012376634,0.000009596207,0.00012897703,0.000013018346],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000074478016,0.0000901205,0.000027527085,0.000024124594,0.000005049176,8.403899e-7,0.00032317993,0.9906542,0.0023073654,0.0050687073,0.0010083683,0.00048308863],"study_design_scores_gemma":[0.00019663792,0.000015645204,0.00037920987,0.00002765128,0.000003076508,0.000012294082,0.000014586299,0.9981647,0.0004763016,0.00054322527,0.000008105152,0.0001585805],"about_ca_topic_score_codex":0.0000019729948,"about_ca_topic_score_gemma":6.336038e-7,"teacher_disagreement_score":0.8540754,"about_ca_system_score_codex":0.00014071248,"about_ca_system_score_gemma":0.000012719871,"threshold_uncertainty_score":0.507872},"labels":[],"label_agreement":null},{"id":"W2163826395","doi":"10.1109/tla.2011.6030982","title":"An Analytical Approach to the Economical Assessment of Wind Distributed Generators Penetration in Electric Power Systems with Centralized Thermal Generation","year":2011,"lang":"en","type":"article","venue":"IEEE Latin America Transactions","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Distributed generation; Electric power system; Penetration (warfare); Wind generator; Electricity generation; Engineering; Automotive engineering; Electric power; Computer science; Control engineering; Electrical engineering; Reliability engineering; Renewable energy; Power (physics); Operations research","score_opus":0.019257508902055166,"score_gpt":0.22695479314529263,"score_spread":0.20769728424323747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2163826395","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3386269,0.000015710468,0.6597815,0.000010952233,0.0001273504,0.0004359958,0.00002084271,0.0000616066,0.0009191266],"genre_scores_gemma":[0.99209154,0.000009059125,0.007657327,0.000012287944,0.000034587367,0.000098465185,0.000057393096,0.00003332835,0.0000059986887],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99868834,0.00016974358,0.0004532919,0.00023895023,0.00017706811,0.00027260373],"domain_scores_gemma":[0.99945307,0.000027614778,0.00007737995,0.00028305876,0.000057825593,0.000101066056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015681819,0.00017880737,0.00026353964,0.00018076308,0.00006884911,0.000044735738,0.00014652689,0.000083117986,0.000042288775],"category_scores_gemma":[0.000002438425,0.00014176374,0.000045035693,0.0009089431,0.000026074504,0.00020974265,9.3352077e-7,0.00018860429,0.0000026143578],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001691097,0.00016297416,0.0010753677,0.000009612182,0.00006399288,5.1789414e-7,0.0005372418,0.98909956,0.008622569,0.000099509656,0.000033319717,0.0002784468],"study_design_scores_gemma":[0.0003159159,0.00017896121,0.019148458,0.0000067966844,0.000047907182,0.0000052103455,0.00009978786,0.97744924,0.0025447283,4.895922e-7,0.000030599138,0.00017191141],"about_ca_topic_score_codex":0.00018266498,"about_ca_topic_score_gemma":0.000044743683,"teacher_disagreement_score":0.6534647,"about_ca_system_score_codex":0.00021679162,"about_ca_system_score_gemma":0.00007239015,"threshold_uncertainty_score":0.57809573},"labels":[],"label_agreement":null},{"id":"W2164802766","doi":"10.1109/tpwrs.2004.831699","title":"Optimal Investment Planning for Distributed Generation in a Competitive Electricity Market","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":528,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity market; Investment (military); Sizing; Electricity; Distributed generation; Capacity planning; Heuristic; Compensation (psychology); Operations research; Computer science; Mathematical optimization; Business; Microeconomics; Economics; Engineering; Operations management","score_opus":0.012919199215162259,"score_gpt":0.22189822387450853,"score_spread":0.20897902465934626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2164802766","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017011546,0.00022942181,0.9783341,0.000024803454,0.0014019166,0.0012109324,0.00015602575,0.00030057752,0.0013306221],"genre_scores_gemma":[0.9977992,0.000014067325,0.0013358338,0.000029856352,0.000026218728,0.0005972115,0.00005792647,0.000050885854,0.000088782384],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998596,0.000067010726,0.00046704483,0.00027982265,0.00021115421,0.00037893918],"domain_scores_gemma":[0.99950266,0.000071440976,0.000062651154,0.00020063254,0.00007654571,0.0000860783],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025203015,0.0002422314,0.00028933678,0.00033277046,0.000105500236,0.000074498006,0.00010755344,0.00015294933,0.000010916014],"category_scores_gemma":[0.000006714275,0.00026806007,0.00007924815,0.0005644544,0.0000139336635,0.0001988978,4.3276918e-7,0.0002059964,0.000010251328],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003709841,0.000087775785,0.0000066321722,0.000053533204,0.00006224262,0.0000061830565,0.000408848,0.99668723,0.0016061959,0.0003840239,0.00064155954,0.000018699444],"study_design_scores_gemma":[0.0021168662,0.00032800608,0.000068565365,0.0002068531,0.000032855478,0.000038628426,0.00018615674,0.9730916,0.021965882,0.000010623508,0.0015325927,0.00042139122],"about_ca_topic_score_codex":0.000054572887,"about_ca_topic_score_gemma":0.000033081255,"teacher_disagreement_score":0.9807877,"about_ca_system_score_codex":0.0009840784,"about_ca_system_score_gemma":0.00005967565,"threshold_uncertainty_score":0.9999772},"labels":[],"label_agreement":null},{"id":"W2165320540","doi":"10.1109/tpwrs.2009.2038060","title":"Coordination of Investor-Owned DG Capacity Growth in Distribution Systems","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Schematic; Investment (military); Distributed generation; Distribution (mathematics); Function (biology); Selection (genetic algorithm); Industrial organization; Unit (ring theory); Business; Computer science; Microeconomics; Operations research; Risk analysis (engineering); Economics; Engineering; Renewable energy; Electrical engineering; Mathematics","score_opus":0.00773446605784893,"score_gpt":0.18666072654525565,"score_spread":0.1789262604874067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2165320540","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18403897,0.0000861003,0.80590296,0.000018358149,0.0075384947,0.0007431578,0.00014608326,0.00032623392,0.0011996253],"genre_scores_gemma":[0.9994835,0.000012748537,0.00006193544,0.0000028676152,0.000020392652,0.00018651517,0.000023867811,0.000051458952,0.00015667864],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981073,0.00013770752,0.00076744764,0.00027476912,0.00038443363,0.00032831464],"domain_scores_gemma":[0.99902993,0.000107886386,0.0001514238,0.0003768134,0.00022531471,0.00010863089],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00052281626,0.00026508467,0.0004177071,0.0004140165,0.000072527524,0.000059776674,0.00019600826,0.00032623965,0.000012246967],"category_scores_gemma":[0.00002237168,0.00028163427,0.00008939014,0.00091389817,0.000048584327,0.00036049695,7.059433e-7,0.00049508194,0.00003119769],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000541895,0.00041897813,0.0012113698,0.0012517138,0.00020321271,0.000008865059,0.0013844015,0.89822537,0.08839221,0.0067488533,0.001966901,0.00013393085],"study_design_scores_gemma":[0.001995894,0.00029201483,0.0014066357,0.00059800304,0.00007884032,0.0001237958,0.0003124687,0.9183314,0.07417145,0.000033872813,0.0017103399,0.00094528595],"about_ca_topic_score_codex":0.00090134575,"about_ca_topic_score_gemma":0.00016728029,"teacher_disagreement_score":0.8154446,"about_ca_system_score_codex":0.000346563,"about_ca_system_score_gemma":0.000042340813,"threshold_uncertainty_score":0.9999636},"labels":[],"label_agreement":null},{"id":"W2165723336","doi":"10.1109/pes.2006.1708860","title":"Localized reactive power markets using the concept of voltage control areas","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"AC power; Voltage optimisation; Volt-ampere reactive; Voltage; Power control; Control (management); Electric power system; Power (physics); Voltage regulation; Computer science; Control theory (sociology); Electrical engineering; Engineering; Physics","score_opus":0.00363905546666036,"score_gpt":0.18733620088808736,"score_spread":0.183697145421427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2165723336","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29932737,0.0022944037,0.6938794,0.000025030058,0.00138628,0.00051443593,0.000048440703,0.00054592045,0.0019787278],"genre_scores_gemma":[0.99030924,0.000012317486,0.009020513,0.000048776612,0.00028255983,0.000028126367,0.000013463617,0.00014076763,0.0001442496],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978238,0.000071971,0.0006887265,0.00031691103,0.00042256166,0.00067604193],"domain_scores_gemma":[0.9989505,0.0002155333,0.00018921566,0.00039383743,0.00017225035,0.000078690384],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006470728,0.00042750267,0.00049104507,0.00007681127,0.00011909952,0.00005988462,0.00028321127,0.00020092748,0.000026154452],"category_scores_gemma":[0.00006732988,0.00039175953,0.0003371694,0.00056233746,0.00006429299,0.00019191334,0.000024781908,0.0003558774,0.0000033195213],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000729308,0.000017089826,0.00025841445,0.00003625177,0.00015273773,0.0000034287232,0.00033008747,0.82067937,0.1747716,0.00012181674,0.0035986272,0.000023262917],"study_design_scores_gemma":[0.00092007057,0.000021590466,0.0003728183,0.00013944374,0.000077045115,0.000025725723,0.00010156716,0.92764276,0.06860702,0.000010421327,0.0016132237,0.0004683355],"about_ca_topic_score_codex":0.00017795846,"about_ca_topic_score_gemma":0.000002806377,"teacher_disagreement_score":0.69098186,"about_ca_system_score_codex":0.00032300298,"about_ca_system_score_gemma":0.000040284307,"threshold_uncertainty_score":0.99985343},"labels":[],"label_agreement":null},{"id":"W2166154009","doi":"10.1109/tpwrs.2008.926401","title":"Determination of Network Rental Components in a Competitive Electricity Market","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Renting; Tracing; Electricity market; Revenue; Mathematical optimization; Constraint (computer-aided design); Electricity; Electric power transmission; Economic surplus; Economics; Computer science; Engineering; Mathematics; Finance","score_opus":0.011740085809468925,"score_gpt":0.19659923373462854,"score_spread":0.18485914792515962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166154009","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05309804,0.00019699485,0.9353546,0.0000035646692,0.0018162468,0.00055638264,0.000025165984,0.00018758944,0.008761412],"genre_scores_gemma":[0.99919766,0.00008342761,0.00035244037,0.0000051907527,0.000012240821,0.00006995347,0.0000052228734,0.000037515354,0.00023635778],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998525,0.00015313325,0.00053808733,0.00019524478,0.00029019907,0.00029828318],"domain_scores_gemma":[0.9994474,0.00012260921,0.00009360998,0.00021005432,0.00006881373,0.000057533274],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020637478,0.00019119745,0.00034143837,0.00034084645,0.000072394374,0.000011420385,0.00012617369,0.00012836193,0.000034459474],"category_scores_gemma":[0.0000030797096,0.00021635073,0.00007779329,0.0007765415,0.00002940277,0.00016279207,5.81914e-7,0.00021852991,0.00001682163],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016467429,0.00041595637,0.0012530629,0.00023538386,0.000119043005,0.00005552273,0.0012722708,0.9899032,0.0048458935,0.0001182027,0.0012560186,0.00036074652],"study_design_scores_gemma":[0.0013132591,0.0002558127,0.0045862747,0.00044829276,0.000025644229,0.00022452734,0.0000740712,0.9835387,0.008596817,0.0000055398295,0.00049540866,0.00043563818],"about_ca_topic_score_codex":0.000095887386,"about_ca_topic_score_gemma":0.00003852978,"teacher_disagreement_score":0.94609964,"about_ca_system_score_codex":0.00031040484,"about_ca_system_score_gemma":0.000023604833,"threshold_uncertainty_score":0.8822527},"labels":[],"label_agreement":null},{"id":"W2166443853","doi":"10.1109/ccece.2008.4564592","title":"Optimal allocation of spinning reserve in a restructured power system using particle swarm optimization","year":2008,"lang":"en","type":"article","venue":"Conference proceedings - Canadian Conference on Electrical and Computer Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Spinning; Particle swarm optimization; Electric power system; Probabilistic logic; Reliability (semiconductor); Genetic algorithm; Computer science; Mathematical optimization; Reliability engineering; Power (physics); Engineering; Mathematics; Algorithm","score_opus":0.01565606345648153,"score_gpt":0.18914062289888017,"score_spread":0.17348455944239866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166443853","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71494037,0.00012211005,0.28388163,0.00003637491,0.00013162258,0.00029425608,0.0000030323647,0.000184189,0.00040642108],"genre_scores_gemma":[0.988277,0.000049592218,0.011548834,0.000013131541,0.00003829015,0.000023608758,0.000005776812,0.000038154136,0.000005608452],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983566,0.000013248537,0.00047571465,0.0003530356,0.00022838348,0.00057305966],"domain_scores_gemma":[0.9992032,0.000026444402,0.000080021615,0.00011905284,0.00027150408,0.00029979373],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014335442,0.00028296385,0.00037372217,0.00054553803,0.00008263351,0.00008983645,0.00021276361,0.00018125148,0.0000075090848],"category_scores_gemma":[0.000038573595,0.00031862865,0.00003375836,0.0009419983,0.000033578162,0.0003087865,0.000023171215,0.00030879574,0.0000012967828],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014920715,0.000011199434,0.002043254,0.00013803555,0.000023757464,0.000018328812,0.000778281,0.98396534,0.0023920748,0.010192508,0.00002150765,0.00040077794],"study_design_scores_gemma":[0.00034702715,0.0001357452,0.0025817817,0.00032752805,0.000009265138,0.00008994073,0.000043143908,0.9937874,0.0023487445,0.000007924803,0.0000090227695,0.0003124626],"about_ca_topic_score_codex":0.0016079695,"about_ca_topic_score_gemma":0.00018035871,"teacher_disagreement_score":0.27333665,"about_ca_system_score_codex":0.00043834024,"about_ca_system_score_gemma":0.00024413335,"threshold_uncertainty_score":0.99992657},"labels":[],"label_agreement":null},{"id":"W2166464259","doi":"10.1109/tpwrs.2010.2048345","title":"Assessing the Yearly Impact of Wind Power Through a New Hybrid Deterministic/Stochastic Unit Commitment","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Wind power; Mathematical optimization; Probabilistic logic; Electric power system; Probability density function; Schedule; Residual; Economic dispatch; Reliability engineering; Computer science; Operations research; Power (physics); Engineering; Mathematics; Algorithm; Electrical engineering; Statistics","score_opus":0.018030964606955666,"score_gpt":0.27825378883674995,"score_spread":0.26022282422979426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166464259","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10363448,0.00010387491,0.8880982,0.000018657787,0.0044545867,0.0006404617,0.000047168716,0.00022663544,0.0027759399],"genre_scores_gemma":[0.99917823,0.000003641034,0.00027452083,0.000011111203,0.000035273282,0.000031480235,0.0000031735847,0.0000855784,0.00037699362],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99832237,0.000093716575,0.0005768406,0.00024056196,0.00038334256,0.00038319972],"domain_scores_gemma":[0.99864674,0.0002548042,0.00014526221,0.0007149927,0.000104856066,0.00013336973],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025834754,0.00032240598,0.00038081838,0.0001713341,0.00015650556,0.00021594514,0.00032323925,0.0001385087,0.00013763676],"category_scores_gemma":[0.0000121636795,0.0002489112,0.00021261559,0.00041443366,0.00006023471,0.0003983898,0.0000015432763,0.00053971255,0.000075973636],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020921036,0.00013648163,0.000041040177,0.00006547271,0.0004248912,0.000013921196,0.0016505434,0.98640794,0.009337876,0.000106729654,0.0014588576,0.00033535712],"study_design_scores_gemma":[0.0060301824,0.002832971,0.0047085243,0.0017938971,0.0010808541,0.0023432164,0.0020279041,0.9383047,0.030944576,0.00018081849,0.0063034697,0.0034488565],"about_ca_topic_score_codex":0.00032998322,"about_ca_topic_score_gemma":0.000022198526,"teacher_disagreement_score":0.89554375,"about_ca_system_score_codex":0.0001557989,"about_ca_system_score_gemma":0.0001705978,"threshold_uncertainty_score":0.9999963},"labels":[],"label_agreement":null},{"id":"W2166665348","doi":"10.1109/psce.2006.296400","title":"Analysis of Market Power Using an AC Transmission System","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Oligopoly; AC power; Node (physics); Competition (biology); Electric power system; Computer science; Operator (biology); Market power; Transmission (telecommunications); Set (abstract data type); Power flow; Transmission network; Nonlinear system; Mathematical optimization; Power (physics); Power-flow study; Transmission system; Electric power transmission; Voltage; Engineering; Mathematical economics; Economics; Microeconomics; Electrical engineering; Mathematics; Telecommunications; Cournot competition","score_opus":0.004967826262790539,"score_gpt":0.19324196032391017,"score_spread":0.18827413406111962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166665348","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14955874,0.00012734075,0.80433685,0.0000013578319,0.00006546915,0.00008218461,0.0000034225359,0.0002647197,0.0455599],"genre_scores_gemma":[0.9939124,0.0000020815514,0.005824872,0.0000013338421,0.000010913005,0.0000014534962,0.000013027529,0.000018772424,0.00021515701],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993034,0.000035621684,0.00028169304,0.00010727717,0.00014111036,0.00013089756],"domain_scores_gemma":[0.99969226,0.000015385709,0.000034228557,0.00018271671,0.00004050216,0.000034905144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015151786,0.000090119094,0.00022000317,0.00035067784,0.000019210724,0.000013519584,0.00007145857,0.0000663468,0.00019326198],"category_scores_gemma":[0.0000012482168,0.00008316528,0.00007445541,0.0010562736,0.0000043092864,0.00012329221,0.0000028778,0.00003100694,0.0000011861069],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003879122,0.000020286145,0.0015418986,0.000079060854,0.00019066881,0.0000016823274,0.000048589573,0.98116326,0.016355246,0.00016372275,0.00018883604,0.00024283915],"study_design_scores_gemma":[0.000085237196,0.000009852837,0.0020975596,0.000022143877,0.00025263592,0.000002384471,0.00003472856,0.9909013,0.0064003295,8.3582916e-7,0.000099344856,0.00009366505],"about_ca_topic_score_codex":0.00018213398,"about_ca_topic_score_gemma":0.000019209881,"teacher_disagreement_score":0.8443537,"about_ca_system_score_codex":0.000088695815,"about_ca_system_score_gemma":0.0000076203605,"threshold_uncertainty_score":0.33913818},"labels":[],"label_agreement":null},{"id":"W2167141053","doi":"10.1109/naps.2008.5307355","title":"Fuzzy economic dispatch and spinning reserve allocation using evolutionary programming","year":2008,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Economic dispatch; Mathematical optimization; Fuzzy logic; Electricity market; Computer science; Evolutionary programming; Fuzzy set; Electric power system; Point (geometry); Electricity generation; Evolutionary algorithm; Linear programming; Electricity; Power (physics); Mathematics; Engineering","score_opus":0.016151771683969883,"score_gpt":0.21650301833966135,"score_spread":0.20035124665569146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167141053","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8727575,0.00095922867,0.12196703,0.000029063402,0.00020800487,0.00024232359,8.492079e-7,0.00041130386,0.0034247234],"genre_scores_gemma":[0.96407354,0.00008007769,0.035629798,0.0000043507266,0.00006796505,0.000013039123,0.000011039609,0.00002511445,0.0000950758],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940276,0.0000151984605,0.00018935098,0.00014100899,0.00006748586,0.00018419484],"domain_scores_gemma":[0.99976885,0.000017396898,0.00002699472,0.00011766228,0.000022214386,0.000046871854],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008745879,0.000096310745,0.00009891927,0.00009467937,0.000109249246,0.00002130496,0.000051622927,0.000056525278,0.000008146606],"category_scores_gemma":[0.000010123571,0.00010690003,0.000017360433,0.00012452692,0.000018006736,0.00031244312,0.000018983394,0.00006209111,0.000011287562],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006626462,0.000016861788,0.07127493,0.000119958946,0.000060035618,0.000009667137,0.0005417462,0.9195419,0.0028413832,0.001122349,0.0009806408,0.0034838817],"study_design_scores_gemma":[0.00016567875,0.000017215705,0.00848088,0.000029225474,0.0000075216217,0.00011142454,0.000035254787,0.99010813,0.0004932932,0.000046270645,0.0003369251,0.00016816666],"about_ca_topic_score_codex":0.00023664282,"about_ca_topic_score_gemma":0.000033894466,"teacher_disagreement_score":0.091316074,"about_ca_system_score_codex":0.00023133346,"about_ca_system_score_gemma":0.000028326316,"threshold_uncertainty_score":0.43592566},"labels":[],"label_agreement":null},{"id":"W2167867269","doi":"10.1109/pess.2000.867602","title":"Short-term scheduling of inter-utilities power-exchange in re-structured markets","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Universidad de Chile","keywords":"Computer science; Scheduling (production processes); Electric power system; Economic dispatch; Mathematical optimization; Energy exchange; Nonlinear programming; Nonlinear system; Power (physics); Distributed computing","score_opus":0.013960348027851274,"score_gpt":0.20846682694481727,"score_spread":0.19450647891696599,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167867269","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82040083,0.0030092301,0.053426523,0.000045574165,0.0008345775,0.00042123496,0.000009053837,0.0004980049,0.12135495],"genre_scores_gemma":[0.997133,0.00009550583,0.0022028207,0.000008471214,0.000019992427,0.0000106958005,0.000003851463,0.000028554748,0.0004971116],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991481,0.00002939685,0.0003425199,0.00013665101,0.000114059534,0.00022931208],"domain_scores_gemma":[0.9996494,0.00004123891,0.000023788907,0.00021855069,0.000029443014,0.000037600825],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00012442637,0.00013649288,0.00020834734,0.00023754557,0.00001117183,0.000015704221,0.00013288295,0.00009858538,0.001014447],"category_scores_gemma":[0.00003347202,0.00013866341,0.00003953724,0.000290136,0.000015290592,0.00014769507,0.000023746765,0.000115571056,0.000009058887],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029759988,0.0006817042,0.33196712,0.009090689,0.0011902315,0.0002909894,0.072406374,0.23002389,0.06952388,0.0042281514,0.03156069,0.24873869],"study_design_scores_gemma":[0.0007646444,0.00008259232,0.025790188,0.00037965836,0.000017838169,0.000025040572,0.00064920454,0.95109284,0.01992006,0.00008355572,0.00058183545,0.0006125121],"about_ca_topic_score_codex":0.000008548264,"about_ca_topic_score_gemma":0.00006528348,"teacher_disagreement_score":0.721069,"about_ca_system_score_codex":0.00008792993,"about_ca_system_score_gemma":0.0000027181925,"threshold_uncertainty_score":0.99989873},"labels":[],"label_agreement":null},{"id":"W2168145151","doi":"10.1080/15325008.2012.694969","title":"Stochastic Unit Commitment with Wind Generation Penetration","year":2012,"lang":"en","type":"article","venue":"Electric Power Components and Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Power system simulation; Wind power; Clearance; Electricity market; Electricity; Electric power system; Electricity generation; Unit (ring theory); Monte Carlo method; Economic dispatch; Mathematical optimization; Wind speed; Computer science; Operations research; Engineering; Power (physics); Mathematics; Electrical engineering; Meteorology","score_opus":0.021684785670329765,"score_gpt":0.20601983489172526,"score_spread":0.18433504922139549,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168145151","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7047653,0.0054291603,0.28546402,0.000013114214,0.0011051331,0.0007668321,0.0000037817176,0.00024186965,0.0022107782],"genre_scores_gemma":[0.9993685,0.000032544787,0.00010263104,0.000012632928,0.00020583208,0.00003886654,0.000054066262,0.00004112535,0.00014382513],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987417,0.000088814246,0.00029864372,0.0001618892,0.0002978813,0.00041111035],"domain_scores_gemma":[0.99949217,0.00003603843,0.00007281315,0.00019187831,0.00005772591,0.00014935994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002668937,0.00021544687,0.00022883178,0.00019103575,0.00012599405,0.00010676824,0.00007694121,0.000083517916,0.000009723378],"category_scores_gemma":[0.0000058902497,0.0001848663,0.000018732304,0.00035678028,0.000009440342,0.0003116933,0.000008973096,0.00012497278,0.000022026188],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013661805,0.0005047052,0.034560427,0.0004358888,0.0010750211,0.000018593077,0.003768211,0.76255244,0.17924513,0.0075284075,0.0073853545,0.0027891789],"study_design_scores_gemma":[0.0011064818,0.00027935585,0.013890085,0.00007787332,0.00006900836,0.00019763545,0.000056984027,0.9798115,0.00069597154,0.0000039675506,0.0032484632,0.00056271156],"about_ca_topic_score_codex":0.000026327047,"about_ca_topic_score_gemma":0.0000021144756,"teacher_disagreement_score":0.29460314,"about_ca_system_score_codex":0.0001310652,"about_ca_system_score_gemma":0.000014474489,"threshold_uncertainty_score":0.75386286},"labels":[],"label_agreement":null},{"id":"W2168211388","doi":"10.1109/tpwrs.2004.840376","title":"Screening and Mitigation of Exacerbated Market Power Due to Financial Transmission Rights","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Transmission (telecommunications); Position (finance); Transmission network; Power transmission; Market power; Mathematical optimization; Quadratic programming; Quadratic equation; Business; Economics; Computer science; Power (physics); Microeconomics; Finance; Telecommunications; Mathematics","score_opus":0.004312630940553618,"score_gpt":0.1891452348486838,"score_spread":0.1848326039081302,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168211388","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037246015,0.00030384026,0.95690733,0.000056237775,0.0009002266,0.000630906,0.0000349976,0.00029601835,0.0036244327],"genre_scores_gemma":[0.9965749,0.000016519547,0.002538166,0.000019911196,0.000019156289,0.00006302229,0.0000031752384,0.000048460257,0.0007167232],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99846613,0.000090946596,0.0005587953,0.00027971598,0.0003139981,0.00029043603],"domain_scores_gemma":[0.9993382,0.000074407726,0.00006884785,0.0002529009,0.000090247755,0.00017540729],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025630297,0.00025304503,0.00035044042,0.00039561093,0.00012286734,0.00004340057,0.00011207481,0.00020310952,0.00012177515],"category_scores_gemma":[0.000003702252,0.0002552156,0.00007887524,0.0005350744,0.00002015859,0.0002729775,6.298571e-7,0.00018786587,0.00001974363],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019005573,0.0001432492,0.000012846723,0.00025666962,0.00014589481,0.000013077847,0.002672445,0.96127325,0.022230616,0.000114897935,0.0052296105,0.007717365],"study_design_scores_gemma":[0.0029781193,0.000786502,0.001306725,0.001872242,0.00015131499,0.00027906746,0.00017150691,0.76748407,0.16734916,0.000017602695,0.05619654,0.0014071481],"about_ca_topic_score_codex":0.0000469716,"about_ca_topic_score_gemma":0.000020603793,"teacher_disagreement_score":0.95932883,"about_ca_system_score_codex":0.00011164745,"about_ca_system_score_gemma":0.000022497612,"threshold_uncertainty_score":0.99999},"labels":[],"label_agreement":null},{"id":"W2168503562","doi":"10.1109/allerton.2010.5706887","title":"Volatility and efficiency in markets with friction","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Volatility (finance); Market efficiency; Stochastic differential equation; Economics; Differential game; Function (biology); Econometrics; Game theory; Mathematical optimization; Computer science; Mathematical economics; Financial economics; Mathematics; Applied mathematics","score_opus":0.0018080987973579047,"score_gpt":0.16069326342862514,"score_spread":0.15888516463126723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168503562","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8991339,0.000023736804,0.075804554,0.000008195486,0.00009239753,0.000082792845,1.5715013e-7,0.000120052304,0.02473421],"genre_scores_gemma":[0.9981145,0.0000033209872,0.0017874703,0.0000024792184,0.000007059293,0.000004340203,5.833488e-7,0.000005689613,0.000074542346],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997457,0.000005789714,0.00006480963,0.000065360604,0.00004392425,0.00007441071],"domain_scores_gemma":[0.99988043,0.000015868933,0.000005561877,0.0000697823,0.000009879472,0.000018450497],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009917016,0.00004135047,0.000042812386,0.00005118076,0.000010673274,0.000010306291,0.000020073674,0.000032936034,0.00003045367],"category_scores_gemma":[0.000010363344,0.000033869717,0.000002812389,0.00016846017,0.0000053045605,0.00007666414,0.0000029021821,0.0000793846,0.0000021787232],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007044204,0.00014540405,0.87906003,0.00027819895,0.000033401684,0.000012541933,0.001535914,0.03354378,0.045500822,0.0028560264,0.0012229742,0.03574047],"study_design_scores_gemma":[0.00014653994,0.000011361009,0.14185688,0.0000039933884,0.0000012184815,0.000006629438,0.0000061781316,0.8568858,0.0008883442,0.000011311764,0.00012759754,0.000054172127],"about_ca_topic_score_codex":0.00001866519,"about_ca_topic_score_gemma":0.00023551502,"teacher_disagreement_score":0.82334197,"about_ca_system_score_codex":0.000012279067,"about_ca_system_score_gemma":0.0000039594165,"threshold_uncertainty_score":0.1381167},"labels":[],"label_agreement":null},{"id":"W2169896638","doi":"10.1109/icsmc.2007.4413842","title":"Pattern search optimization applied to convex and non-convex economic dispatch","year":2007,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Economic dispatch; Mathematical optimization; Heuristic; Regular polygon; Quadratic equation; Computer science; Electric power system; Function (biology); Convex function; Point (geometry); Mathematics; Power (physics)","score_opus":0.0038054446467615543,"score_gpt":0.19592027216216573,"score_spread":0.19211482751540418,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2169896638","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07536066,0.000021331296,0.9033753,0.000046689245,0.00019817556,0.0003886228,0.000002359899,0.00021639945,0.020390455],"genre_scores_gemma":[0.9912867,0.000021797709,0.0082119,0.00010618332,0.00007673154,0.00001754422,0.000018303639,0.00004443924,0.00021639327],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991391,0.0000066088173,0.0002468932,0.00020780545,0.00009210306,0.00030754274],"domain_scores_gemma":[0.99959433,0.000045986326,0.000016353613,0.00017682606,0.000021523578,0.00014495502],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027829653,0.00013831114,0.00017110076,0.00016557639,0.00003700083,0.00005521307,0.00009138801,0.0000860842,0.0001628679],"category_scores_gemma":[0.0000030979847,0.00014788065,0.000015309573,0.00014945715,0.000009566726,0.000099008175,0.000029602004,0.00007970494,0.00015872544],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000065917184,0.0000058346045,0.004501695,0.000044037413,0.000021617978,0.0000016132664,0.0003236501,0.98594534,0.000721347,0.0000858394,0.00078459835,0.007557858],"study_design_scores_gemma":[0.00035795922,0.000025294088,0.0036134166,0.000009699076,0.000006352561,0.0000046838177,0.00007544259,0.9866333,0.008856896,0.0000030221395,0.0001836489,0.00023028262],"about_ca_topic_score_codex":0.000071300594,"about_ca_topic_score_gemma":0.00006901164,"teacher_disagreement_score":0.91592604,"about_ca_system_score_codex":0.00014562074,"about_ca_system_score_gemma":0.000012938515,"threshold_uncertainty_score":0.6030398},"labels":[],"label_agreement":null},{"id":"W2170036927","doi":"10.1109/tste.2012.2230346","title":"Multiagent Stochastic Simulation of Minute-to-Minute Grid Operations and Control to Integrate Wind Generation Under AC Power Flow Constraints","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Wind power; Grid; Automatic Generation Control; Computer science; Interconnection; Reliability (semiconductor); Power system simulation; Electric power system; Automatic frequency control; Electricity generation; Reliability engineering; Simulation; Computation; Real-time computing; Engineering; Power (physics); Electrical engineering; Telecommunications","score_opus":0.006983961489957405,"score_gpt":0.20225131572324448,"score_spread":0.19526735423328706,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2170036927","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046237413,0.000049841143,0.9518553,0.00014843457,0.0005350371,0.0008794909,0.000040477655,0.00013241351,0.000121567246],"genre_scores_gemma":[0.9956621,0.000008023336,0.002453577,0.00018334427,0.000060099446,0.00026110729,0.000018834819,0.000055885477,0.0012970235],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985199,0.000070095346,0.0004594637,0.00031686114,0.00022788817,0.00040582335],"domain_scores_gemma":[0.99884707,0.00011550975,0.000038603856,0.0002737451,0.0005014514,0.00022363411],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013432837,0.00027333165,0.00028794425,0.00053815544,0.00017952302,0.000105458275,0.000101713464,0.00014080698,0.00022227126],"category_scores_gemma":[0.000024896422,0.0002858795,0.000059626967,0.00057757023,0.00004626285,0.000414752,0.0000019625888,0.00012894829,0.000026195874],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019486082,0.000057119767,4.9961534e-7,0.00002322533,0.0000868584,0.0000021024302,0.00055231765,0.98176,0.01412433,0.00015673431,0.00024555923,0.002971763],"study_design_scores_gemma":[0.00075925404,0.0001931561,0.000026715907,0.00003108722,0.000048777594,0.0000053519334,0.0007181467,0.98295105,0.014780567,0.000019265126,0.00019139478,0.000275212],"about_ca_topic_score_codex":0.00032867916,"about_ca_topic_score_gemma":0.00014886311,"teacher_disagreement_score":0.9494247,"about_ca_system_score_codex":0.0003530284,"about_ca_system_score_gemma":0.00008308304,"threshold_uncertainty_score":0.99995935},"labels":[],"label_agreement":null},{"id":"W2171396468","doi":"","title":"Market Effectiveness Assessment","year":2001,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity market; Market power; Business; Market analysis; Industrial organization; Electricity; Electric power industry; Economics; Marketing; Engineering; Market economy","score_opus":0.004199022243191215,"score_gpt":0.22051969316928455,"score_spread":0.21632067092609333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2171396468","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0153734945,0.00004396521,0.560634,0.0000067297756,0.00019216082,0.00009497879,1.8227026e-7,0.00033897013,0.42331547],"genre_scores_gemma":[0.99685216,0.00003260099,0.0020469879,0.000008133338,0.000025691912,0.000022792967,0.0000018354345,0.000014654903,0.0009951167],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996524,0.00003076253,0.00007064483,0.00006369344,0.00007038373,0.000112107795],"domain_scores_gemma":[0.999808,0.000048495796,0.0000053147214,0.000098345794,0.000014306139,0.000025508958],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015631852,0.00005757934,0.00006709085,0.000041974734,0.000014356978,0.000015191766,0.000045642933,0.00002801782,0.00041142773],"category_scores_gemma":[0.000004572474,0.000054150005,0.000015257402,0.00017567164,0.000002297767,0.00006942157,0.0000051702887,0.000038928847,0.000033127995],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049745457,0.00018102909,0.20879285,0.0006441662,0.00041806197,0.00012039437,0.00012040981,0.6099267,0.017155575,0.008694848,0.09427248,0.059623715],"study_design_scores_gemma":[0.000438494,0.00003504393,0.13194682,0.000030993513,0.000009634723,0.000039084985,0.000007941367,0.8542298,0.0028234983,0.000112980364,0.010094789,0.00023092689],"about_ca_topic_score_codex":0.000005553,"about_ca_topic_score_gemma":0.000003216387,"teacher_disagreement_score":0.9814787,"about_ca_system_score_codex":0.00009299032,"about_ca_system_score_gemma":0.0000058919295,"threshold_uncertainty_score":0.4504845},"labels":[],"label_agreement":null},{"id":"W2172125678","doi":"10.1109/mper.2001.4311150","title":"Valuation of Dynamic Reactive Power Support Services for Transmission Access","year":2001,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Powertech Labs (Canada)","funders":"","keywords":"Valuation (finance); AC power; Procurement; Risk analysis (engineering); Business; Electricity; Computer science; Environmental economics; Economics; Finance; Engineering; Marketing; Electrical engineering","score_opus":0.013444254591261572,"score_gpt":0.27068763982653704,"score_spread":0.25724338523527546,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2172125678","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00818795,0.04170299,0.9455021,0.00009243769,0.0010560004,0.0016551059,0.000019826843,0.0005200764,0.0012635259],"genre_scores_gemma":[0.9651828,0.030265763,0.0039506177,0.000070276285,0.00002853839,0.00021872106,0.00007100147,0.00012481096,0.000087476954],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99861854,0.000019529316,0.00057450705,0.00022976726,0.00026114276,0.0002965155],"domain_scores_gemma":[0.9992463,0.000077874705,0.000111099056,0.00031274988,0.00016809009,0.00008386411],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00041993946,0.00025911414,0.00047161072,0.0001698694,0.000021788566,0.000023766985,0.00028554414,0.00010501183,0.000080490776],"category_scores_gemma":[0.000025792471,0.0002589586,0.00014977591,0.00054478203,0.0000058866253,0.00043176886,0.0000093738445,0.000116729585,0.000012974004],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010262253,0.00031202304,0.00032706527,0.07533585,0.0009946462,0.000030299225,0.0019112023,0.6883542,0.12260989,0.00033877697,0.005749296,0.1039341],"study_design_scores_gemma":[0.001308204,0.00034841473,0.0015520889,0.014930796,0.0004884899,0.00012295414,0.00001565469,0.81872904,0.018658217,0.000065603126,0.14242737,0.0013531712],"about_ca_topic_score_codex":0.000003451573,"about_ca_topic_score_gemma":0.000001019973,"teacher_disagreement_score":0.95699483,"about_ca_system_score_codex":0.00013258313,"about_ca_system_score_gemma":0.000026712298,"threshold_uncertainty_score":0.9999863},"labels":[],"label_agreement":null},{"id":"W2172171685","doi":"10.1109/tpwrs.2007.894858","title":"Negotiating Bilateral Contracts in Electricity Markets","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Spot contract; Forward contract; Negotiation; Regret; Spot market; Electricity; Electricity market; Microeconomics; Vendor; Generator (circuit theory); Economics; Forward price; Business; Computer science; Finance; Marketing; Power (physics); Engineering","score_opus":0.0055624995670086955,"score_gpt":0.20109169869598606,"score_spread":0.19552919912897737,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2172171685","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.083035514,0.00042116165,0.90331566,0.000008934987,0.0044171293,0.0006120413,0.000010106109,0.0005255113,0.00765392],"genre_scores_gemma":[0.9992878,0.00003323125,0.00013864246,0.000021118936,0.000026532154,0.000049103535,0.0000024825736,0.00007144108,0.00036968026],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99790055,0.00009745132,0.0007235344,0.00028664796,0.0003269226,0.0006649065],"domain_scores_gemma":[0.9991699,0.0002431406,0.00008190118,0.0002992238,0.00006966987,0.00013617473],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008213517,0.00027988138,0.000343488,0.00064805493,0.0000862851,0.0001032862,0.00015979091,0.0002331514,0.000025112322],"category_scores_gemma":[0.00001038815,0.00029928127,0.00007765969,0.00096825976,0.000013136414,0.00030326803,4.5626552e-7,0.00045277047,0.000066292225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000073799274,0.0001205274,0.0002734053,0.00007840516,0.0000812742,0.00006319114,0.00050307804,0.9920919,0.005411284,0.00006321153,0.00035765662,0.0008822437],"study_design_scores_gemma":[0.002180001,0.0002272727,0.0043717725,0.0003781109,0.000043602402,0.00023928157,0.00021690881,0.9652561,0.023170996,0.0000063313096,0.0028653597,0.0010442908],"about_ca_topic_score_codex":0.00018363382,"about_ca_topic_score_gemma":0.00007301513,"teacher_disagreement_score":0.91625226,"about_ca_system_score_codex":0.000510924,"about_ca_system_score_gemma":0.000030465186,"threshold_uncertainty_score":0.99994594},"labels":[],"label_agreement":null},{"id":"W2178564072","doi":"10.1109/tpwrs.2012.2187345","title":"A Practical Real-Time OPF Method Using New Triangular Approximate Model of Wind Electric Generators","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Monte Carlo method; Probabilistic logic; Electric power system; Wind power; Wind speed; Economic dispatch; Transmission (telecommunications); Engineering; Computer science; Mathematical optimization; Simulation; Power (physics); Control theory (sociology); Real-time computing; Statistics; Electrical engineering; Mathematics; Control (management)","score_opus":0.03125046962274885,"score_gpt":0.2789079514905259,"score_spread":0.24765748186777703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2178564072","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008563309,0.00031379526,0.9865633,0.000010071787,0.0020509767,0.0007724047,0.000023883838,0.00039652456,0.0013057381],"genre_scores_gemma":[0.9307213,0.00004468821,0.068262175,0.000007095786,0.000068459645,0.000032271902,0.0000030740355,0.0001407466,0.0007202158],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99746203,0.00027228022,0.00085724576,0.00029774682,0.000469267,0.0006414129],"domain_scores_gemma":[0.9986953,0.00014940761,0.00020007958,0.0005450162,0.00010145564,0.000308731],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008796924,0.0003596233,0.0006042817,0.00053807144,0.00009648355,0.00005547527,0.0001587238,0.0003078207,0.00003848622],"category_scores_gemma":[0.000015380021,0.0003703911,0.0001804868,0.0010191725,0.000013173361,0.0005631279,0.0000011529859,0.00030533306,0.00004265751],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030577885,0.0001058647,0.0000029371458,0.00009377225,0.00019605324,0.0000015531002,0.00044405815,0.84886426,0.14938252,0.00015159756,0.0006327203,0.00009408456],"study_design_scores_gemma":[0.0005090623,0.000066110064,9.165676e-7,0.000059331283,0.00017155841,0.00010730059,0.00003441923,0.8927601,0.10586469,0.0000046608698,0.00010832293,0.0003135433],"about_ca_topic_score_codex":0.00013601477,"about_ca_topic_score_gemma":9.2547117e-7,"teacher_disagreement_score":0.92215794,"about_ca_system_score_codex":0.00038747245,"about_ca_system_score_gemma":0.00018706694,"threshold_uncertainty_score":0.99987483},"labels":[],"label_agreement":null},{"id":"W2180269203","doi":"10.1109/tpwrs.2013.2271980","title":"Identification of Umbrella Constraints in DC-Based Security-Constrained Optimal Power Flow","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":148,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Mathematical optimization; Power flow; Constraint (computer-aided design); Set (abstract data type); Optimization problem; Computer science; Power (physics); Mathematics; Electric power system","score_opus":0.005698909431682394,"score_gpt":0.20064812216742858,"score_spread":0.1949492127357462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2180269203","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.055632997,0.00012436409,0.9375338,0.00004130797,0.0025399905,0.0011963932,0.00010170369,0.0003341181,0.0024953277],"genre_scores_gemma":[0.9990644,0.000010299458,0.00040121216,0.000013501549,0.000007779093,0.0002632926,0.000009286799,0.000068599955,0.00016163537],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99757266,0.00014613984,0.0011165132,0.00035420974,0.00039396805,0.00041651915],"domain_scores_gemma":[0.99886,0.0001411665,0.00016676381,0.00050800183,0.00019766057,0.00012641848],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00040273883,0.00031941902,0.00045067488,0.0006454442,0.000058634385,0.000094219635,0.00023931301,0.00027147506,0.00033922456],"category_scores_gemma":[0.000010530161,0.00035537366,0.00014155734,0.0007520352,0.00011962902,0.00031885516,7.0911926e-7,0.00032497125,0.00021302997],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013748505,0.00016941219,0.000025572439,0.00020342623,0.000083485356,0.0000053699932,0.0007232483,0.97314906,0.02495573,0.00007818525,0.00035936592,0.00023340777],"study_design_scores_gemma":[0.0012329402,0.000112341215,0.00010218552,0.00029918074,0.000030518215,0.00003724658,0.00041798802,0.9456374,0.0515724,0.000009586111,0.00010613613,0.00044209647],"about_ca_topic_score_codex":0.00007129192,"about_ca_topic_score_gemma":0.000014610435,"teacher_disagreement_score":0.9434314,"about_ca_system_score_codex":0.00023921361,"about_ca_system_score_gemma":0.00008483829,"threshold_uncertainty_score":0.99988985},"labels":[],"label_agreement":null},{"id":"W21808505","doi":"10.1007/0-306-47663-0_15","title":"Decentralized Nodal-Price Self-Dispatch and Unit Commitment","year":2005,"lang":"en","type":"book-chapter","venue":"Kluwer Academic Publishers eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; McGill University","funders":"","keywords":"Computer science; Common value auction; Mathematical optimization; Exploit; Scheduling (production processes); Profit (economics); Power system simulation; Operations research; Microeconomics; Economics; Electric power system; Power (physics); Mathematics; Computer security","score_opus":0.01186199189299367,"score_gpt":0.2097926629806227,"score_spread":0.19793067108762905,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W21808505","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0001528614,0.0063401605,0.00209015,0.00023151479,0.001143357,0.0011851831,0.00003921843,0.0019777464,0.98683983],"genre_scores_gemma":[0.015174299,0.0032045422,0.005272947,0.0011645469,0.0012698985,0.00023297116,0.00038507517,0.001041012,0.9722547],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99680835,0.000048561014,0.0009454916,0.0006751489,0.0006629918,0.0008594655],"domain_scores_gemma":[0.9983301,0.00013207822,0.00027689766,0.0006472936,0.0001457798,0.00046783438],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.00047694508,0.0008740513,0.00081098935,0.0005235184,0.00012065965,0.00035452328,0.0007246507,0.0017597903,0.00032087567],"category_scores_gemma":[0.000031682866,0.00095769874,0.00015396447,0.000079862686,0.000083699,0.00066111266,0.00017046413,0.002275031,0.000100879835],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007720435,0.000039715607,0.00053584366,0.0012497107,0.002761376,0.000089003675,0.0034160102,0.0029188497,0.00019964286,0.04514806,0.89770746,0.045857113],"study_design_scores_gemma":[0.0010540901,0.000030133777,0.000034490484,0.00027682979,0.00024068798,0.00007436503,0.000017273429,0.006198514,0.000067379515,0.0011491181,0.9898216,0.001035498],"about_ca_topic_score_codex":0.00001472945,"about_ca_topic_score_gemma":0.000011587809,"teacher_disagreement_score":0.09211415,"about_ca_system_score_codex":0.0007329452,"about_ca_system_score_gemma":0.0001432261,"threshold_uncertainty_score":0.99953616},"labels":[],"label_agreement":null},{"id":"W2181044291","doi":"","title":"Wind farms as reactive power ancillary service providers - technical and economic issues","year":2008,"lang":"en","type":"article","venue":"Chalmers Publication Library (Chalmers University of Technology)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Payment; Grid; Turbine; Reliability engineering; Service (business); AC power; Term (time); Wind speed; Electric power system; Electricity; Component (thermodynamics); Operations research; Environmental science; Power (physics); Environmental economics; Meteorology; Engineering; Business; Electrical engineering; Economics; Mathematics; Finance; Geography","score_opus":0.005252733575385164,"score_gpt":0.16721054456767626,"score_spread":0.1619578109922911,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2181044291","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8944738,0.0024578152,0.0014532838,0.026543345,0.00020969215,0.0011084175,0.000058400652,0.003580982,0.070114285],"genre_scores_gemma":[0.99320775,0.0014452009,0.004278947,0.000111613415,0.000017192287,0.0000028902186,0.00008420025,0.00005278683,0.0007994212],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99885815,0.00002641375,0.00025097834,0.00042382668,0.00013821013,0.00030244372],"domain_scores_gemma":[0.99910665,0.000029197281,0.00017314733,0.00047452518,0.00009129086,0.0001251893],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000074782736,0.0002346564,0.000317312,0.00095979834,0.00016257945,0.000019908248,0.0005038371,0.00044916087,0.00016665267],"category_scores_gemma":[0.000021552416,0.00030210722,0.00005913599,0.0010375663,0.00033627704,0.0020850066,0.0001642141,0.0002872042,0.000066886016],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012655471,0.0016220342,0.23557097,0.0023043281,0.0043820846,0.00079935644,0.023342887,0.015774732,0.074650615,0.11565487,0.48403347,0.040599108],"study_design_scores_gemma":[0.007186326,0.0014685622,0.04892992,0.00041810863,0.00033219086,0.002618554,0.024504783,0.0247633,0.06527723,0.002788599,0.8172774,0.0044350293],"about_ca_topic_score_codex":0.000048686034,"about_ca_topic_score_gemma":0.0000046191117,"teacher_disagreement_score":0.33324394,"about_ca_system_score_codex":0.0001542498,"about_ca_system_score_gemma":0.00013321092,"threshold_uncertainty_score":0.9999431},"labels":[],"label_agreement":null},{"id":"W2184804762","doi":"10.24200/tjer.vol7iss2pp24-31","title":"Impacts of Wind Power Variability on Generation Costs - An Overview","year":2010,"lang":"en","type":"article","venue":"The Journal of Engineering Research [TJER]","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"University of Waterloo; Sultan Qaboos University","keywords":"Wind power; Electricity; Electricity generation; Globe; Environmental science; Environmental economics; Power (physics); Meteorology; Engineering; Electrical engineering; Economics; Geography; Medicine","score_opus":0.042556587748235425,"score_gpt":0.3289526866390106,"score_spread":0.2863960988907752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2184804762","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9897787,0.00061789114,0.0080295205,0.00007758819,0.0007541575,0.0002284075,0.000004814694,0.00004014122,0.00046876824],"genre_scores_gemma":[0.9985155,0.00027691282,0.00085893704,0.000005764408,0.00029000873,0.0000016250851,0.0000020362427,0.000039238515,0.000009988604],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981028,0.00023827353,0.00047834642,0.00008755104,0.0007491879,0.0003438565],"domain_scores_gemma":[0.99824345,0.000528974,0.00009554985,0.0004655867,0.00048921723,0.00017721986],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006722283,0.00013838323,0.00023705623,0.000344229,0.000056139223,0.00004653511,0.00042185248,0.00011109534,0.00006322547],"category_scores_gemma":[0.0012641569,0.00010124998,0.00006117031,0.0005657303,0.00003364293,0.00032388867,0.000027603477,0.0010864915,0.0000065256327],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034407036,0.00006638346,0.00020529477,0.000094480776,0.00006635813,0.000004809623,0.00038114298,0.44684952,0.5498001,0.00093558047,0.00083622604,0.0007256732],"study_design_scores_gemma":[0.0011928319,0.0017697948,0.019815452,0.0005233221,0.00005790972,0.0002785525,0.000059055907,0.7845781,0.18888168,0.00018605456,0.002194975,0.00046226528],"about_ca_topic_score_codex":0.000022364393,"about_ca_topic_score_gemma":0.000013051974,"teacher_disagreement_score":0.36091843,"about_ca_system_score_codex":0.00021099453,"about_ca_system_score_gemma":0.00009084039,"threshold_uncertainty_score":0.47203255},"labels":[],"label_agreement":null},{"id":"W2198099674","doi":"","title":"Market Power Indices and Wholesale Price Elasticity of Electricity Demand","year":2014,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Guelph","funders":"","keywords":"Price elasticity of demand; Lerner index; Economics; Market power; Electricity market; Wholesale market; Electricity; Elasticity (physics); Econometrics; Index (typography); Agricultural economics; Microeconomics","score_opus":0.008429493135086676,"score_gpt":0.24201221818581162,"score_spread":0.23358272505072494,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2198099674","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8737043,0.00092835387,0.0023889984,0.000031462354,0.0003263761,0.0008964193,0.00003859397,0.00011923339,0.12156622],"genre_scores_gemma":[0.99249786,0.0063624545,0.0006516566,0.000008860548,0.00006129741,0.000074512456,0.000015318838,0.00006792476,0.00026011668],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976432,0.00027631872,0.0006688129,0.0005504022,0.00024541997,0.0006158457],"domain_scores_gemma":[0.9982819,0.0006851535,0.00018597064,0.0005679941,0.00010132629,0.00017763203],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0021506643,0.00028757204,0.00061595155,0.0007158347,0.000060161914,0.000081948565,0.00043472863,0.00049705384,0.000053873948],"category_scores_gemma":[0.0005790467,0.00033077493,0.00006964621,0.00023108545,0.00013261187,0.00009557122,0.00037793847,0.0011843338,0.0000023282641],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002484136,0.0002496712,0.052214347,0.0050580874,0.0006671921,0.000028162154,0.001397415,0.8828639,0.0013417755,0.0003342255,0.0010437516,0.054553088],"study_design_scores_gemma":[0.001006354,0.00020730925,0.055067,0.0005405533,0.000029662613,0.000028431054,0.00009673789,0.9349462,0.0018566985,0.000664502,0.004675252,0.00088129466],"about_ca_topic_score_codex":0.000026992024,"about_ca_topic_score_gemma":0.000052687537,"teacher_disagreement_score":0.1213061,"about_ca_system_score_codex":0.00060595747,"about_ca_system_score_gemma":0.0002047229,"threshold_uncertainty_score":0.9999144},"labels":[],"label_agreement":null},{"id":"W2205798303","doi":"","title":"Genetic Algorithms: An Overview and Application to Power System Optimization","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Mathematical optimization; Electric power system; Computer science; Robustness (evolution); Genetic algorithm; Optimization problem; Nonlinear programming; Set (abstract data type); Power (physics); Nonlinear system; Algorithm; Mathematics","score_opus":0.005278324383300367,"score_gpt":0.20535963753719214,"score_spread":0.20008131315389177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2205798303","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030908578,0.0012398742,0.98789895,0.00001600938,0.00010001485,0.0004440948,0.0000025522481,0.00067516556,0.0065324577],"genre_scores_gemma":[0.8849007,0.000049230373,0.11470333,0.00002847733,0.00006907839,0.000089796136,0.00002383974,0.000042187803,0.00009339429],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992945,0.00002103112,0.00022491193,0.00018980606,0.00011629833,0.00015343765],"domain_scores_gemma":[0.9996351,0.000008822266,0.000022973187,0.00021267882,0.000051008556,0.00006940541],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008018954,0.00011728114,0.00011775833,0.000105562496,0.00003823439,0.000054653417,0.000069362075,0.00006437285,0.000014221625],"category_scores_gemma":[0.0000021927367,0.00012182463,0.000012316804,0.0003229516,0.0000041849516,0.00014514041,0.0000104866995,0.000029995721,0.000027528422],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[7.455641e-7,0.0000073070823,0.0001307683,0.000059749687,0.0000043526306,5.3322526e-7,0.00002732049,0.9954782,0.00036455548,0.0017591747,0.00029391234,0.0018733708],"study_design_scores_gemma":[0.00011186552,0.00003293928,0.0014478486,0.000019675064,0.000009124355,0.0000178195,0.000021206599,0.9973541,0.00024812837,0.000010671765,0.0005743831,0.00015225293],"about_ca_topic_score_codex":0.0000862412,"about_ca_topic_score_gemma":0.000019066232,"teacher_disagreement_score":0.88180983,"about_ca_system_score_codex":0.000108858454,"about_ca_system_score_gemma":0.000005868394,"threshold_uncertainty_score":0.49678645},"labels":[],"label_agreement":null},{"id":"W2224802780","doi":"10.47749/t/unicamp.2000.199313","title":"Fluxo de potencia otimo parametrico","year":2000,"lang":"es","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Physics; Art","score_opus":0.003236181899050255,"score_gpt":0.19183063296362457,"score_spread":0.18859445106457431,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2224802780","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14205606,0.003365489,0.18146549,0.0002048763,0.0004597889,0.00045481737,0.000009901918,0.0010999715,0.6708836],"genre_scores_gemma":[0.97202826,0.0007917755,0.011845597,0.00011830369,0.00017048557,0.000012092598,0.000009019985,0.00006800389,0.014956461],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99853235,0.00006368553,0.00035387214,0.0002490997,0.00023087786,0.00057013496],"domain_scores_gemma":[0.9993131,0.00009627371,0.00003252883,0.00035375025,0.000043687964,0.00016066933],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0002270469,0.0002390546,0.0002524778,0.00025221228,0.000063152795,0.00014754961,0.00022074363,0.0002391763,0.0063486807],"category_scores_gemma":[0.00007196931,0.00025392842,0.000086932145,0.0013116844,0.00001382214,0.00018610807,0.000011730527,0.00020372724,0.0026472353],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019950552,0.0001410232,0.006100645,0.00025667207,0.00022039558,0.000060483042,0.0003728724,0.7449166,0.0008208932,0.004712633,0.025896952,0.21648088],"study_design_scores_gemma":[0.0005141899,0.000108160784,0.009554336,0.00010383891,0.00008027599,0.000075237105,0.00001903087,0.9503375,0.0038854466,0.00010558723,0.034628797,0.0005875724],"about_ca_topic_score_codex":0.00022048657,"about_ca_topic_score_gemma":0.0000033396757,"teacher_disagreement_score":0.8299722,"about_ca_system_score_codex":0.00030531475,"about_ca_system_score_gemma":0.00006413703,"threshold_uncertainty_score":0.9999913},"labels":[],"label_agreement":null},{"id":"W2236616832","doi":"10.6000/1929-6002.2015.04.04.3","title":"Regional Electric-Power Systems Planning and Carbon Dioxide Emissions Management under Uncertainty","year":2015,"lang":"en","type":"article","venue":"Journal of Technology Innovations in Renewable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Fundamental Research Funds for the Central Universities; National Key Research and Development Program of China","keywords":"Renewable energy; Time horizon; Environmental economics; Electricity; Electricity generation; Energy planning; Electric power system; Fossil fuel; Electric power; Energy supply; Environmental science; Power (physics); Engineering; Business; Energy (signal processing); Economics; Waste management; Electrical engineering","score_opus":0.01431194286651096,"score_gpt":0.2323775069485291,"score_spread":0.21806556408201813,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2236616832","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4091883,0.02052155,0.54578966,0.0021929077,0.0019632373,0.00029633107,0.000002086062,0.00054802716,0.019497924],"genre_scores_gemma":[0.99675405,0.00021473055,0.0025815896,0.000039345705,0.00003185159,0.000021178987,0.0000030675499,0.000025078067,0.00032913033],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99869704,0.00002888662,0.00066156185,0.00012780327,0.0002327248,0.00025199074],"domain_scores_gemma":[0.9992069,0.000036460242,0.0002249317,0.0001955294,0.00027919837,0.0000569861],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003860169,0.00014670091,0.0002687472,0.0022067428,0.000040586572,0.000021416376,0.00020807792,0.00023225449,0.0000011226788],"category_scores_gemma":[0.000070935566,0.00014133344,0.000020215319,0.0027557716,0.000029389896,0.00012715529,0.00003812303,0.00026079075,1.8294588e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000928665,0.00002247288,0.0011508542,0.000013018079,0.00008673455,0.000040279585,0.00003277109,0.9805016,0.0023502437,0.012154979,0.0034015176,0.00023623357],"study_design_scores_gemma":[0.004510519,0.0006117951,0.0009183033,0.0015326901,0.00013036688,0.0029758061,0.005048726,0.8731308,0.008850294,0.029323786,0.07181763,0.0011492781],"about_ca_topic_score_codex":0.00011063508,"about_ca_topic_score_gemma":0.00001865087,"teacher_disagreement_score":0.5875657,"about_ca_system_score_codex":0.00047189524,"about_ca_system_score_gemma":0.00008993712,"threshold_uncertainty_score":0.57634103},"labels":[],"label_agreement":null},{"id":"W2243807080","doi":"","title":"Wind and solar curtailment","year":2013,"lang":"en","type":"article","venue":"Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Wind power; Meteorology; Environmental science; Electric power system; Solar power; Photovoltaic system; Engineering; Power (physics); Electrical engineering; Geography; Physics","score_opus":0.03433597912488528,"score_gpt":0.3231545892502786,"score_spread":0.28881861012539334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2243807080","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88626736,0.019360304,0.020257065,0.0033998152,0.00091065787,0.008454118,0.0001554181,0.0018336757,0.059361592],"genre_scores_gemma":[0.994844,0.0008981142,0.0025332896,0.000010747387,0.00004157101,0.0004786353,0.000025484951,0.000024766265,0.0011433872],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974193,0.00002361148,0.00029783664,0.0005077222,0.0009103293,0.00084120274],"domain_scores_gemma":[0.99855524,0.00017152428,0.000047985483,0.00018247457,0.0008964936,0.00014630576],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002420521,0.00016670217,0.00017338704,0.0022948373,0.00062699406,0.00017849811,0.0004009359,0.00017872296,0.000020030531],"category_scores_gemma":[0.00086295715,0.00015590769,0.000020065174,0.0030776684,0.00072713435,0.00071907585,0.00014689352,0.00033900046,0.000016413791],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047559555,0.000524646,0.03219964,0.000985469,0.00034019753,0.000020220612,0.0013327905,0.00031267555,0.21934165,0.14058651,0.12084074,0.4834679],"study_design_scores_gemma":[0.0041292696,0.0035519379,0.016092023,0.00045193254,0.000047093716,0.00044768388,0.0015914595,0.6279536,0.09379276,0.20439439,0.044903398,0.0026444534],"about_ca_topic_score_codex":0.00003392636,"about_ca_topic_score_gemma":0.0000030976921,"teacher_disagreement_score":0.62764096,"about_ca_system_score_codex":0.00028073162,"about_ca_system_score_gemma":0.0003386342,"threshold_uncertainty_score":0.6357731},"labels":[],"label_agreement":null},{"id":"W2244981840","doi":"10.1109/epec.2015.7379933","title":"A proof-of-concept approach to Unit Commitment using the theory of complementarity","year":2015,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Power system simulation; Mathematical optimization; Solver; Complementarity (molecular biology); Computer science; Grid; Integer programming; Complementarity theory; Proof of concept; Power (physics); Electric power system; Mathematics; Nonlinear system","score_opus":0.08519581602566759,"score_gpt":0.27083478478361017,"score_spread":0.18563896875794259,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2244981840","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021101939,0.00013150138,0.95129246,0.00001590401,0.000089077264,0.0005864887,0.000005701542,0.000046513847,0.026730407],"genre_scores_gemma":[0.9754581,1.7236867e-7,0.02441536,0.00002334893,0.000012585931,0.000013346607,0.0000069577072,0.000011453455,0.00005869495],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99936694,0.000080991995,0.00021758919,0.00006551758,0.00015542588,0.00011353522],"domain_scores_gemma":[0.9995889,0.00003871554,0.000037193364,0.0002191758,0.00007372254,0.000042282947],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044102647,0.00007358872,0.00013389147,0.000046707544,0.000017761642,0.00000641856,0.00015744123,0.000021510665,0.000015920326],"category_scores_gemma":[0.0000149162515,0.000052018568,0.00002100667,0.00026224332,0.000020993717,0.000041585692,0.00003689956,0.00004719693,6.4738424e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011843922,0.000090926966,0.0007401688,0.0000620922,0.00009239333,1.1105098e-7,0.0051220977,0.9711568,0.00026671978,0.019193035,0.0015964048,0.0016674193],"study_design_scores_gemma":[0.00069276453,0.00014048822,0.00012588706,0.00003771153,0.00005416696,0.000006121436,0.0037517163,0.9100233,0.08271663,0.0007321923,0.0015139591,0.00020510089],"about_ca_topic_score_codex":0.000106069965,"about_ca_topic_score_gemma":0.000011876462,"teacher_disagreement_score":0.95435613,"about_ca_system_score_codex":0.000071549526,"about_ca_system_score_gemma":0.000025541814,"threshold_uncertainty_score":0.21212557},"labels":[],"label_agreement":null},{"id":"W2246686487","doi":"10.2139/ssrn.604082","title":"Supply Function Equilibria with Pivotal Electricity Suppliers","year":2004,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Electricity; Function (biology); Industrial organization; Business; Mains electricity; Commerce; Microeconomics; Economics; Engineering; Electrical engineering; Voltage","score_opus":0.0022595791168781043,"score_gpt":0.1637087969459828,"score_spread":0.1614492178291047,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2246686487","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32637987,0.0023421491,0.6676926,0.00013936246,0.0003814078,0.00025158987,0.0000019587987,0.00034728355,0.0024637773],"genre_scores_gemma":[0.99796844,0.00095405686,0.0003766701,0.000029015244,0.0002841434,0.000013863224,0.000014624736,0.000089421315,0.00026979396],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99642456,0.000038058108,0.00033812664,0.0002265926,0.00039437605,0.0025782695],"domain_scores_gemma":[0.9994635,0.000020539226,0.000093934934,0.00019797558,0.00008732144,0.00013672508],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006266551,0.00028296263,0.00024425992,0.00027321963,0.00017545532,0.00009545968,0.00023275515,0.00013064597,0.000027637689],"category_scores_gemma":[0.000016562313,0.0002545205,0.000086920496,0.0007475559,0.00002705049,0.00049650576,0.000011195189,0.0016860601,0.000055303095],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00080670527,0.00024754633,0.004751375,0.00008401522,0.0018660451,0.000053633605,0.0005038333,0.74286157,0.05083712,0.17921093,0.001008005,0.017769229],"study_design_scores_gemma":[0.048712656,0.026682602,0.01243307,0.0007835295,0.002154197,0.046438016,0.0037510016,0.1296172,0.070991635,0.63798237,0.010595721,0.009858026],"about_ca_topic_score_codex":0.00003513929,"about_ca_topic_score_gemma":0.00036550662,"teacher_disagreement_score":0.67158854,"about_ca_system_score_codex":0.0030116432,"about_ca_system_score_gemma":0.0013029003,"threshold_uncertainty_score":0.9999907},"labels":[],"label_agreement":null},{"id":"W2248480965","doi":"10.2139/ssrn.2612234","title":"Inverse Optimization for the Recovery of Market Structure from Market Outcomes: An Application to the MISO Electricity Market","year":2014,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Wilfrid Laurier University","funders":"","keywords":"Electricity market; Electricity; Business; Microeconomics; Economics; Engineering; Electrical engineering","score_opus":0.003357652170966917,"score_gpt":0.19666309418385816,"score_spread":0.19330544201289124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2248480965","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009932546,0.0006027744,0.98654735,0.0005694034,0.0004195266,0.0009826244,0.00004679763,0.00008850305,0.0008104674],"genre_scores_gemma":[0.99044424,0.0013555149,0.0064047463,0.00027683066,0.00049960945,0.00010364131,0.000053959368,0.000108132954,0.0007533481],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99737746,0.00030443375,0.0005509328,0.00026718355,0.00034966046,0.0011503125],"domain_scores_gemma":[0.99825084,0.0006106951,0.00027835366,0.0005751746,0.00019308833,0.00009185454],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026126094,0.00027562722,0.00031735588,0.0001670861,0.00026082888,0.000091727765,0.00070520496,0.00016283638,0.0001517528],"category_scores_gemma":[0.0003675888,0.00018485698,0.00014145406,0.0005656035,0.000020764011,0.00028836651,0.000025235178,0.0008038859,0.0000023414],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003376321,0.000037292215,0.0011030989,0.000030157862,0.0004452694,1.0850583e-7,0.00019089255,0.9277356,0.00053484726,0.0009590605,0.019482793,0.049143247],"study_design_scores_gemma":[0.00061763276,0.00023488826,0.0016813674,0.00001619489,0.00013261804,0.000025503905,0.00015966898,0.98590946,0.00021027421,0.0070728646,0.0037013777,0.0002381205],"about_ca_topic_score_codex":0.00009353209,"about_ca_topic_score_gemma":0.0013910228,"teacher_disagreement_score":0.98051167,"about_ca_system_score_codex":0.0007715431,"about_ca_system_score_gemma":0.0003036706,"threshold_uncertainty_score":0.7538249},"labels":[],"label_agreement":null},{"id":"W2259533060","doi":"10.17863/cam.5224","title":"A cross country analysis of electricity market reforms","year":2012,"lang":"en","type":"article","venue":"Apollo (University of Cambridge)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity market; Electricity; Economics; Business; Natural resource economics; Engineering","score_opus":0.00412463992307961,"score_gpt":0.18300225966973957,"score_spread":0.17887761974665997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2259533060","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.879287,0.0004815581,0.06712131,0.000007955667,0.0001369959,0.000116120915,0.000069104106,0.00011730693,0.052662626],"genre_scores_gemma":[0.9970738,0.0001035413,0.0006060364,0.000005357091,0.000015942873,1.47426e-7,0.00003005284,0.000011676175,0.0021534439],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9992079,0.000028150567,0.0001614749,0.00010170654,0.00022450447,0.00027625568],"domain_scores_gemma":[0.9994091,0.000042209143,0.00011511729,0.00025741258,0.00009318806,0.000083017425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028682657,0.00010591215,0.00033838293,0.00045164223,0.000051643805,0.000005697458,0.00020145129,0.00010069093,0.00011504574],"category_scores_gemma":[0.000017114777,0.00012710573,0.00014458338,0.0020247747,0.000048471364,0.00038426302,0.000029615803,0.000085156986,0.000006439728],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041840872,0.00046217444,0.84992707,0.0009828275,0.011486254,0.0000192115,0.0039906753,0.07243164,0.014236949,0.007172825,0.031743106,0.007128837],"study_design_scores_gemma":[0.0007563388,0.000054913526,0.73044974,0.000026335498,0.0012617302,0.000006732424,0.00029365995,0.25910336,0.0030466998,0.0000024855424,0.004627077,0.00037094016],"about_ca_topic_score_codex":0.00060802704,"about_ca_topic_score_gemma":0.00005979499,"teacher_disagreement_score":0.18667172,"about_ca_system_score_codex":0.00016244687,"about_ca_system_score_gemma":0.000022853503,"threshold_uncertainty_score":0.5183221},"labels":[],"label_agreement":null},{"id":"W2264656926","doi":"10.2172/814128","title":"Review of the Structure of Bulk Power Markets Grid of the Future White Paper","year":2000,"lang":"en","type":"report","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Restructuring; Competition (biology); Transmission (telecommunications); Industrial organization; Business; Incentive; Electricity market; White paper; Rulemaking; Power transmission; Commission; Telecommunications; Electricity; Computer science; Economics; Finance; Power (physics); Engineering; Microeconomics","score_opus":0.003422760150039919,"score_gpt":0.19700190681917282,"score_spread":0.1935791466691329,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2264656926","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00048647838,0.44335562,0.00014195839,0.0003025922,0.008375067,0.0020939016,0.0004731837,0.00010387456,0.5446673],"genre_scores_gemma":[0.22393823,0.73885816,0.00086665485,0.00063190405,0.0014032532,0.00002517587,0.00018596361,0.0004233741,0.03366728],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977897,0.00010764967,0.0009521634,0.00018410766,0.0007895835,0.00017681124],"domain_scores_gemma":[0.99784607,0.000033645087,0.00054403703,0.001175625,0.00037489168,0.000025720836],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00031793615,0.0003050627,0.0007696203,0.00006497281,0.000019490242,0.000004470861,0.00058666564,0.00039558884,0.003156062],"category_scores_gemma":[0.00007183006,0.00015596018,0.0003700515,0.0006382428,0.00003468232,0.000049876024,0.000058217098,0.00040527838,9.705901e-7],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008917837,0.000023184804,0.00055868964,0.05485871,0.00057979074,8.9601076e-7,0.0001558981,0.0046504457,0.0007817399,0.000030037485,0.93477994,0.0035717366],"study_design_scores_gemma":[0.00021537225,0.000027425378,0.006607577,0.03379609,0.0005150843,0.00015755255,0.000018622317,0.0001494146,0.0030506055,0.000021408066,0.954933,0.0005078554],"about_ca_topic_score_codex":0.00001785709,"about_ca_topic_score_gemma":0.000026098984,"teacher_disagreement_score":0.51100004,"about_ca_system_score_codex":0.000104686675,"about_ca_system_score_gemma":0.00029394048,"threshold_uncertainty_score":0.99775517},"labels":[],"label_agreement":null},{"id":"W2264863617","doi":"10.1109/tsg.2015.2445794","title":"Distributed Real-Time Power Balancing in Renewable-Integrated Power Grids With Storage and Flexible Loads","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Electric Power System Optimization","field":"Engineering","cited_by":104,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University; University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"News aggregator; Renewable energy; Grid; Distributed generation; Energy storage; Distributed power; Power (physics); Power Balance; Reliability (semiconductor); Load balancing (electrical power)","score_opus":0.006950663272304577,"score_gpt":0.19564136829368786,"score_spread":0.1886907050213833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2264863617","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1437558,0.00009315111,0.84930325,0.00006689988,0.0011423383,0.00039551093,0.00015144149,0.00082413445,0.004267512],"genre_scores_gemma":[0.99801826,0.000044855642,0.0010821184,0.000018083505,0.000026273141,0.00005134708,0.000052382875,0.000072755196,0.00063390244],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99859726,0.00007112183,0.00033747716,0.00031393478,0.00027507954,0.0004051291],"domain_scores_gemma":[0.9992545,0.000059212503,0.00004349461,0.0003228771,0.000112601716,0.00020726606],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00027577463,0.00029257097,0.000332428,0.00033153984,0.000068937,0.000066537235,0.00010924946,0.00015795682,0.00007155614],"category_scores_gemma":[0.0000072828248,0.00027166164,0.00003829234,0.0010148679,0.00003402029,0.00032202777,0.0000010913254,0.00029792878,0.000049419512],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016602426,0.00008730699,0.00033498145,0.00002520284,0.00007104602,0.00003843548,0.0004217388,0.99023306,0.0037794765,0.0000040921764,0.004715888,0.00012276617],"study_design_scores_gemma":[0.011394355,0.0026897928,0.0037270868,0.0011935353,0.0002502883,0.0005421932,0.0010084976,0.8555868,0.10483046,0.00004805638,0.015636459,0.003092474],"about_ca_topic_score_codex":0.0005456453,"about_ca_topic_score_gemma":0.00032664306,"teacher_disagreement_score":0.8542625,"about_ca_system_score_codex":0.00045408032,"about_ca_system_score_gemma":0.00009986577,"threshold_uncertainty_score":0.99997354},"labels":[],"label_agreement":null},{"id":"W2266398410","doi":"10.1111/caje.12280","title":"Measuring market power and the efficiency of Alberta's restructured electricity market: An energy‐only market design","year":2017,"lang":"en","type":"article","venue":"Canadian Journal of Economics/Revue canadienne d économique","topic":"Electric Power System Optimization","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Carleton University; University of Alberta","funders":"","keywords":"Market power; Factor market; Electricity market; Economics; Investment (military); Production (economics); Electricity; Market price; Earnings; Industrial organization; Business; Microeconomics; Finance","score_opus":0.041071784659859945,"score_gpt":0.15597164548175751,"score_spread":0.11489986082189757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2266398410","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97645015,0.000809016,0.004280126,0.00038860345,0.0011681325,0.00033527994,0.00003478241,0.00001035143,0.016523566],"genre_scores_gemma":[0.9980182,0.0002623547,0.0007121351,0.000068125366,0.00017401017,0.000009262226,0.0000016354282,0.00007419147,0.0006801057],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99785644,0.0002417681,0.0009038634,0.00028863837,0.000008370952,0.00070089806],"domain_scores_gemma":[0.9968175,0.00039813312,0.0008032103,0.0007732323,0.000185087,0.0010227894],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0019047615,0.00032945845,0.00071732816,0.00054721115,0.00035865718,0.00027694396,0.0010116302,0.00021447871,0.00023261934],"category_scores_gemma":[0.0007086395,0.00032595274,0.00015193147,0.00010338109,0.00025680344,0.00061877695,0.000021763906,0.00032098286,5.845321e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.005802624,0.00011060865,0.045793165,0.0009321622,0.0048975623,0.00082897296,0.014278583,0.41916928,0.0005629509,0.41377378,0.049412433,0.04443789],"study_design_scores_gemma":[0.0075544,0.001011262,0.02903937,0.00054527656,0.00037609055,0.0041261925,0.00034965636,0.88730925,0.002197458,0.054105222,0.011214702,0.0021711092],"about_ca_topic_score_codex":0.10214077,"about_ca_topic_score_gemma":0.87701696,"teacher_disagreement_score":0.7748762,"about_ca_system_score_codex":0.0010801288,"about_ca_system_score_gemma":0.0013374368,"threshold_uncertainty_score":0.99991924},"labels":[],"label_agreement":null},{"id":"W2271923957","doi":"","title":"Optimization models and techniques for implementation and pricing of electricity markets","year":2001,"lang":"en","type":"dissertation","venue":"Library and Archives Canada (Government of Canada)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity market; Electricity pricing; Economics; Environmental economics; Computer science; Industrial organization; Business; Engineering; Electrical engineering","score_opus":0.0025467093073053295,"score_gpt":0.16094549506387673,"score_spread":0.1583987857565714,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2271923957","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20656218,0.009994326,0.4373909,0.00041030673,0.0007404984,0.0053741843,0.0010584547,0.00022648567,0.33824268],"genre_scores_gemma":[0.9807108,0.0034784074,0.013999579,0.00003707059,0.00002776857,0.000053313488,0.00022901126,0.000057434212,0.0014066246],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987969,0.000023537013,0.00034895548,0.00017562858,0.00048129406,0.00017370326],"domain_scores_gemma":[0.9995285,0.00011816238,0.00019765529,0.00008022927,0.0000021342018,0.00007330659],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000016574864,0.00018532132,0.00027174255,0.000068106405,0.0000666775,0.000016444841,0.000063536696,0.000056576115,0.0000036818933],"category_scores_gemma":[0.00000209674,0.00020904263,0.000013951555,0.00009756603,0.000010506154,0.0003184784,0.000013800725,0.00007296191,3.1357503e-11],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0036918137,0.00010067081,0.011623723,0.02767978,0.0017072689,0.000035333855,0.0024579028,0.22667177,0.1096574,0.091201894,0.0040474,0.521125],"study_design_scores_gemma":[0.00051056815,0.00012302067,0.0025855384,0.00039101255,0.00011358028,0.0000068452428,0.0014823354,0.70394725,0.2886981,0.0011897661,0.0004883139,0.00046368426],"about_ca_topic_score_codex":0.0006246582,"about_ca_topic_score_gemma":0.0064656828,"teacher_disagreement_score":0.77414864,"about_ca_system_score_codex":0.000013166936,"about_ca_system_score_gemma":0.00032577445,"threshold_uncertainty_score":0.8524511},"labels":[],"label_agreement":null},{"id":"W2279777571","doi":"10.1007/s11431-011-4631-6","title":"Optimization based accurate scheduling for generation and reserve of power system","year":2011,"lang":"en","type":"article","venue":"Science China Technological Sciences","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Mathematical optimization; Scheduling (production processes); Computer science; Spinning; Electric power system; Reserve requirement; Electricity generation; Economic dispatch; Optimization problem; Power system simulation; Nonlinear programming; Control theory (sociology); Nonlinear system; Power (physics); Engineering; Mathematics; Control (management); Economics","score_opus":0.04174346538717881,"score_gpt":0.24248180368161665,"score_spread":0.20073833829443782,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2279777571","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27045447,0.00013997479,0.72619534,0.00005022024,0.00015044674,0.00030902223,0.000002395785,0.00037533813,0.0023228077],"genre_scores_gemma":[0.8372523,0.000008879282,0.16269502,0.000003485733,0.0000058757073,0.00002795716,7.698528e-7,0.000004178344,0.0000015225928],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99883294,0.000017970413,0.0002504176,0.00032063574,0.00029543295,0.00028261208],"domain_scores_gemma":[0.99956316,0.000032565862,0.000090264046,0.00015725505,0.00010660561,0.000050137394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016176632,0.0001037134,0.00013740327,0.00031737963,0.00031958608,0.00007131363,0.00048510192,0.00009628828,0.000007768114],"category_scores_gemma":[0.00039853036,0.00007656844,0.000021812553,0.0019311421,0.0009213144,0.0005324679,0.000046010213,0.00006337599,5.6025914e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000041479043,0.000018133975,0.0009926335,0.00005184232,0.0000024263722,4.7695113e-7,0.00011999637,0.9401369,0.025556145,0.03209028,0.000006839863,0.0010201407],"study_design_scores_gemma":[0.00008913357,0.0001551223,0.0005302075,0.000033834145,0.00000322412,0.0000028945142,0.00013627982,0.9357801,0.06295717,0.00021141123,0.000002215575,0.000098373755],"about_ca_topic_score_codex":0.000007227833,"about_ca_topic_score_gemma":0.0000018324258,"teacher_disagreement_score":0.56679785,"about_ca_system_score_codex":0.000065389344,"about_ca_system_score_gemma":0.000055861463,"threshold_uncertainty_score":0.33946213},"labels":[],"label_agreement":null},{"id":"W2283074482","doi":"10.1093/oso/9780199542185.003.0035","title":"Market-Based Policies for Renewable Energy Source Electricity: A Comparative Evaluation","year":2008,"lang":"en","type":"article","venue":"TSpace","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; University of British Columbia","funders":"","keywords":"Renewable energy; Electricity market; Electricity; Environmental economics; Natural resource economics; Business; Economics; Engineering; Electrical engineering","score_opus":0.03452513343112909,"score_gpt":0.2898785967482067,"score_spread":0.25535346331707764,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2283074482","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019355662,0.0009439491,0.9443668,0.00008927432,0.00012288267,0.00041864198,0.000002125578,0.00041020862,0.03429046],"genre_scores_gemma":[0.9892268,0.000022251726,0.003123515,0.00006978737,0.00008581147,0.0002117995,0.00002986118,0.000035992754,0.007194175],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99908483,0.00007301031,0.00016355455,0.00015007003,0.0002422546,0.00028627182],"domain_scores_gemma":[0.9993999,0.00015504283,0.000052623436,0.00018046125,0.00016016043,0.000051818595],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023182623,0.00014508936,0.0001976802,0.00016856419,0.00011718019,0.00001863983,0.00009200154,0.00007176403,0.00005736468],"category_scores_gemma":[0.000057435096,0.0001577983,0.000048995837,0.0004919103,0.000016627742,0.00007223839,0.0000053938115,0.000047013335,0.0000055475193],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027496919,0.000017429782,0.00007520695,0.000021872358,0.000033017186,3.466765e-7,0.0011415659,0.9021303,0.002691226,0.000038570048,0.093545385,0.00027758392],"study_design_scores_gemma":[0.00057691074,0.00006600614,0.00010231896,0.000013005311,0.000025183672,0.000006549345,0.00007199299,0.9381979,0.03904774,0.000028104498,0.021695655,0.00016861138],"about_ca_topic_score_codex":0.0006750108,"about_ca_topic_score_gemma":0.00017525103,"teacher_disagreement_score":0.96987116,"about_ca_system_score_codex":0.00025430368,"about_ca_system_score_gemma":0.00009898906,"threshold_uncertainty_score":0.64348286},"labels":[],"label_agreement":null},{"id":"W2286133046","doi":"10.1007/s40565-016-0193-8","title":"Frequency aware robust economic dispatch","year":2016,"lang":"en","type":"article","venue":"Journal of Modern Power Systems and Clean Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"National Key Research and Development Program of China; National Natural Science Foundation of China","keywords":"Robust optimization; Mathematical optimization; Economic dispatch; Exploit; Bilinear interpolation; Computer science; Affine transformation; Optimization problem; Complementarity (molecular biology); Robustness (evolution); Electric power system; Mathematics","score_opus":0.0059508518811549555,"score_gpt":0.17252370282814086,"score_spread":0.1665728509469859,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2286133046","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06055973,0.004483501,0.93059343,0.00007244205,0.0019872568,0.0000458378,0.000010265375,0.000059814403,0.0021876902],"genre_scores_gemma":[0.99856293,0.00070294505,0.000116876836,0.000010563176,0.00019095153,0.0000029024395,6.185136e-7,0.000047156816,0.00036503153],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988805,0.000044735567,0.0005731343,0.00012245572,0.00015472976,0.0002244646],"domain_scores_gemma":[0.99934685,0.00004231761,0.00021830434,0.00017572689,0.00007269949,0.00014411981],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020909894,0.00016449852,0.00032450733,0.00014013798,0.00003615152,0.000057899917,0.00015565805,0.00010556676,0.000024381217],"category_scores_gemma":[0.0000072918024,0.00011294793,0.000077037665,0.000049214974,0.000016192847,0.00034866322,0.000014680403,0.00007473073,0.0000055789715],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057248588,0.00007979568,0.009502784,0.00026087507,0.00090428634,0.00017278153,0.0008224584,0.87004364,0.008774364,0.013762404,0.027488802,0.06813058],"study_design_scores_gemma":[0.008435893,0.0014380808,0.0061130296,0.0039811386,0.00030457645,0.0058336854,0.0008766707,0.91393065,0.006919203,0.0038422942,0.045251302,0.003073468],"about_ca_topic_score_codex":0.00007015532,"about_ca_topic_score_gemma":0.00006410709,"teacher_disagreement_score":0.93800324,"about_ca_system_score_codex":0.00021394239,"about_ca_system_score_gemma":0.000039477367,"threshold_uncertainty_score":0.46058828},"labels":[],"label_agreement":null},{"id":"W2292985490","doi":"10.1109/icmla.2015.63","title":"A Data-Driven Method to Detect the Abnormal Instances in an Electricity Market","year":2015,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Electricity market; Electricity; Process (computing); Anomaly detection; Order (exchange); Computer science; Computation; Competition (biology); Electricity retailing; Business; Data mining; Algorithm; Finance; Engineering","score_opus":0.035081734338083814,"score_gpt":0.28813363223839067,"score_spread":0.25305189790030685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2292985490","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015988313,0.00020895604,0.954275,0.00007291452,0.00014431289,0.0003562585,0.000009595105,0.00028293012,0.028661685],"genre_scores_gemma":[0.88016564,0.000011456969,0.119412236,0.00011443534,0.00006091077,0.000034728255,0.000012827611,0.000025342626,0.00016245437],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989673,0.0001924478,0.00020722435,0.00019153894,0.00018178398,0.00025968908],"domain_scores_gemma":[0.9992486,0.00008920348,0.000019356376,0.00050294853,0.000041099847,0.00009875975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011667705,0.000109411645,0.0001394172,0.00013226063,0.000022795677,0.000054230946,0.0005485589,0.000049497256,0.000024873561],"category_scores_gemma":[0.00009221142,0.00008016737,0.000010398065,0.0008602143,0.000004509131,0.0004372156,0.00005970856,0.00012806004,0.000017151455],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000085429034,0.00003140976,0.003382813,0.000031068776,0.00005107551,0.000015548385,0.0010979782,0.87770563,0.00089318975,0.00032416606,0.047301047,0.06908063],"study_design_scores_gemma":[0.00020216056,0.00006576366,0.0013404855,0.0000061711203,0.0000057884154,0.000009986238,0.000053952255,0.99058783,0.0008916339,0.000052311618,0.006644025,0.00013987321],"about_ca_topic_score_codex":0.000121251804,"about_ca_topic_score_gemma":0.0024937794,"teacher_disagreement_score":0.8641773,"about_ca_system_score_codex":0.00012861985,"about_ca_system_score_gemma":0.00004398144,"threshold_uncertainty_score":0.32691303},"labels":[],"label_agreement":null},{"id":"W229373040","doi":"10.2172/900946","title":"A Regional Approach to Market Monitoring in the West","year":2006,"lang":"en","type":"report","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Office of Electricity; BC Hydro; Permitting, Siting and Analysis; Office of Electricity Delivery and Energy Reliability; Johns Hopkins University; U.S. Department of Energy","keywords":"Market power; Wholesale market; Market price; Function (biology); Economics; Business; Microeconomics; Electricity; Engineering","score_opus":0.027040149735790168,"score_gpt":0.24005459489432185,"score_spread":0.21301444515853168,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W229373040","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00009301045,0.0010228652,0.039550897,0.00002900458,0.0007786526,0.0005111095,0.0000031921022,0.0002175609,0.9577937],"genre_scores_gemma":[0.7808414,0.0021068254,0.03924743,0.00011291477,0.007755768,0.0021664586,0.000515478,0.00064013037,0.1666136],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99841714,0.00004427802,0.00036655893,0.00022835974,0.00066773844,0.00027590248],"domain_scores_gemma":[0.99943155,0.00006430658,0.00004232341,0.00035741166,0.00007120146,0.000033186403],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073171256,0.00022787426,0.00025548588,0.0002839398,0.000023126839,0.0000627561,0.00030707227,0.00023307528,0.000016052505],"category_scores_gemma":[0.000035662826,0.00017585912,0.00005942539,0.00058940455,0.000004593806,0.000048922084,0.000018565574,0.00033545276,0.000017444872],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000018857128,0.000034052835,0.0015649224,0.00030781177,0.00003277075,0.000012254467,0.00013965428,0.112759076,0.0000043858386,0.000037362275,0.8840303,0.0010755354],"study_design_scores_gemma":[0.00036337634,0.000037749807,0.04065058,0.000727574,0.00007059005,0.0006111054,0.00019216149,0.072533935,0.000036267607,0.000021862461,0.88336813,0.0013866362],"about_ca_topic_score_codex":0.00053159526,"about_ca_topic_score_gemma":0.00004813354,"teacher_disagreement_score":0.79118013,"about_ca_system_score_codex":0.00051923905,"about_ca_system_score_gemma":0.00011339718,"threshold_uncertainty_score":0.7171327},"labels":[],"label_agreement":null},{"id":"W2294686832","doi":"10.1109/hicss.2016.290","title":"The Engineering, Economic and Environmental Electricity Simulation Tool (E4ST): Description and an Illustration of Its Capability and Use as a Planning/Policy Analysis Tool","year":2016,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Investment (military); Computer science; Electric power transmission; Download; Economic analysis; Interconnection; Electric power; Engineering; Power (physics); Industrial engineering; Environmental economics; Systems engineering; Electrical engineering; Telecommunications; Economics","score_opus":0.009268841063584568,"score_gpt":0.21462866070619321,"score_spread":0.20535981964260863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2294686832","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9170604,0.00015939098,0.08241529,0.000013819858,0.00002087287,0.00023512132,0.000013132353,0.000060030186,0.00002196068],"genre_scores_gemma":[0.99940497,0.00024366632,0.00023272594,0.00000341509,0.000027916267,0.000010610159,0.000011617505,0.0000123546015,0.00005271564],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928814,0.000034800727,0.000270765,0.00018588794,0.00007594704,0.00014446709],"domain_scores_gemma":[0.9995562,0.00018010385,0.000058179998,0.00014779801,0.000011795348,0.000045927532],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021758853,0.00012502524,0.00014892728,0.00016381161,0.00006061382,0.00007630827,0.000034980792,0.000077552446,0.00000769273],"category_scores_gemma":[0.00008839185,0.00009238523,0.000021401194,0.00013137575,0.000028197395,0.00072367035,0.000013027131,0.000041176238,7.513979e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038965274,0.000018804707,0.054985788,0.000038607533,0.00017812735,3.4502182e-7,0.00038627928,0.8953035,0.041012757,0.0010214596,0.000010484846,0.0070048966],"study_design_scores_gemma":[0.00021711545,0.00007284195,0.09122557,0.000005942524,0.00006485798,0.000003270289,0.000013568305,0.90502787,0.0031715124,0.000027388709,0.000052726347,0.00011732376],"about_ca_topic_score_codex":0.00008046335,"about_ca_topic_score_gemma":0.000048750237,"teacher_disagreement_score":0.08234459,"about_ca_system_score_codex":0.00017696529,"about_ca_system_score_gemma":0.000012325291,"threshold_uncertainty_score":0.37673604},"labels":[],"label_agreement":null},{"id":"W2298753630","doi":"10.19030/jber.v10i2.6791","title":"Competitive Entry In Ontarios Deregulated Power Generation Industry","year":2012,"lang":"en","type":"article","venue":"Journal of Business & Economics Research (JBER)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Acadia University","funders":"","keywords":"Deregulation; Outcome (game theory); Market power; Microeconomics; Electricity market; Economics; Production (economics); Industrial organization; Risk aversion (psychology); Perfect competition; Electricity; Electric power industry; Business; Expected utility hypothesis; Market economy; Financial economics; Monopoly","score_opus":0.043526807833867705,"score_gpt":0.2771341249198647,"score_spread":0.23360731708599702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2298753630","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9905119,0.0008958476,0.0017060402,0.0002645283,0.00095735746,0.00020079466,0.0000039102397,0.000018068467,0.0054415613],"genre_scores_gemma":[0.99825484,0.0004999509,0.00055060786,0.000019290726,0.0004975324,0.0000064465967,0.000012897378,0.00004027459,0.000118164266],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99833256,0.00013784065,0.00066677673,0.000108652515,0.0002262451,0.00052789674],"domain_scores_gemma":[0.99882376,0.00011031443,0.00015838069,0.00017264894,0.00055616035,0.00017874042],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001598865,0.00014313815,0.00030516286,0.0007945236,0.00005712757,0.00010963506,0.00022359978,0.00029249952,0.0001832563],"category_scores_gemma":[0.00014820074,0.00015042938,0.000046297228,0.00063748984,0.000037337602,0.0010719491,0.00004357269,0.0009926353,0.000032960124],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013765728,0.0003967653,0.05171559,0.00010062314,0.0002995613,0.0000591671,0.0023237956,0.91828,0.00802939,0.007375295,0.00815846,0.0031237006],"study_design_scores_gemma":[0.006564919,0.00029815052,0.62478733,0.0009027021,0.00006421333,0.0011918665,0.0015619475,0.27632228,0.020790497,0.00034919995,0.06568171,0.0014851821],"about_ca_topic_score_codex":0.00007871373,"about_ca_topic_score_gemma":0.0002984679,"teacher_disagreement_score":0.6419577,"about_ca_system_score_codex":0.0012259353,"about_ca_system_score_gemma":0.0002636521,"threshold_uncertainty_score":0.6134332},"labels":[],"label_agreement":null},{"id":"W2313732016","doi":"10.1541/ieejpes.133.770","title":"A Count Model Analysis of the Traded Contracts in JEPX Forward Market","year":2013,"lang":"en","type":"article","venue":"IEEJ Transactions on Power and Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nutrasource","funders":"","keywords":"Overdispersion; Econometrics; Negative binomial distribution; Spot contract; Count data; Forward rate; Forward contract; Forward price; Carry (investment); Zero (linguistics); Rest (music); Economics; Mathematics; Statistics; Financial economics; Interest rate; Poisson distribution; Monetary economics; Finance","score_opus":0.0034605722430842596,"score_gpt":0.16652726569980966,"score_spread":0.1630666934567254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2313732016","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07141924,0.00022090186,0.9156368,0.000119898985,0.000197788,0.000110949455,0.000026500584,0.000068772235,0.012199168],"genre_scores_gemma":[0.9990329,0.0001433906,0.00016922208,0.000061516395,0.0000021844312,0.000049386734,0.0000019780923,0.000015180888,0.000524229],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993311,0.000028409773,0.0002366326,0.000117890704,0.00012851419,0.00015744632],"domain_scores_gemma":[0.9996606,0.00005075146,0.00002673339,0.00018881995,0.000029477696,0.00004360606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000067664165,0.00011069818,0.00021077096,0.00028469024,0.000032451917,0.000018352986,0.00008033878,0.0000810001,0.00012234767],"category_scores_gemma":[0.0000027212357,0.00008853689,0.00009780202,0.00072682154,0.000018089575,0.00012394188,7.8543815e-7,0.0000890688,7.578865e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007858824,0.000037197275,0.0000489237,0.000006948557,0.00023306682,2.9214928e-7,0.00024904817,0.9971797,0.00068044016,0.00014629027,0.00021922025,0.0011910492],"study_design_scores_gemma":[0.0002603046,0.00001589401,0.0024490303,0.000014378409,0.00013834937,0.0000017022687,0.00003083942,0.99526083,0.0013754831,0.000059550966,0.00029571386,0.00009791306],"about_ca_topic_score_codex":0.0003034065,"about_ca_topic_score_gemma":0.0005014963,"teacher_disagreement_score":0.9276137,"about_ca_system_score_codex":0.000055341636,"about_ca_system_score_gemma":0.000014091966,"threshold_uncertainty_score":0.36104298},"labels":[],"label_agreement":null},{"id":"W2314346896","doi":"10.2316/journal.203.2012.3.203-4930","title":"A HYBRID LR-FA TECHNIQUE TO OPTIMIZE THE PROFIT FUNCTION OF GENCOS IN A RESTRUCTURED POWER SYSTEM","year":2012,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Profit (economics); Function (biology); Business; Operations research; Industrial organization; Economics; Microeconomics; Mathematics; Cell biology; Biology","score_opus":0.003990492100511694,"score_gpt":0.19583064126444383,"score_spread":0.19184014916393213,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2314346896","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20476256,0.004553105,0.7701391,0.0001438674,0.012330375,0.0004442222,0.000022404223,0.00009042285,0.0075139203],"genre_scores_gemma":[0.99904454,0.000035151807,0.0005069031,0.000020077285,0.00024440733,0.000039183305,0.0000021756507,0.000026135274,0.00008140365],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984063,0.00010446815,0.0007478433,0.000090865666,0.0004529357,0.00019761676],"domain_scores_gemma":[0.99912816,0.00005847814,0.0002649527,0.00014041094,0.0003105922,0.00009738476],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006880527,0.00014996101,0.00027964264,0.0004294929,0.00002053567,0.000048355574,0.00027767217,0.00007789199,0.00000862338],"category_scores_gemma":[0.000040134353,0.00010918446,0.00007150398,0.00019034428,0.000015036529,0.0003314184,0.000031253865,0.0001450261,0.0000014383974],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000926546,0.00014220455,0.010061107,0.00041348618,0.0015136303,0.00014057665,0.0049683154,0.88506484,0.051686186,0.035616547,0.0074537173,0.0020128726],"study_design_scores_gemma":[0.019847816,0.0052191573,0.09369902,0.02177183,0.0009985594,0.05683501,0.016490908,0.43623975,0.1285472,0.0010366692,0.21281357,0.006500485],"about_ca_topic_score_codex":0.0000881901,"about_ca_topic_score_gemma":0.000002985956,"teacher_disagreement_score":0.794282,"about_ca_system_score_codex":0.00026207816,"about_ca_system_score_gemma":0.000033478278,"threshold_uncertainty_score":0.4452413},"labels":[],"label_agreement":null},{"id":"W2318760440","doi":"10.2139/ssrn.2756618","title":"Measuring Demand Responses to Wholesale Electricity Prices Using Market Power Indices","year":2016,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Market power; Electricity market; Wholesale market; Electricity; Economics; Demand response; Business; Electricity demand; Industrial organization; Econometrics; Microeconomics; Commerce; Power (physics); Monetary economics; Agricultural economics; Electricity generation; Electrical engineering; Engineering; Monopoly","score_opus":0.011197637838685751,"score_gpt":0.21450162654496993,"score_spread":0.2033039887062842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2318760440","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6031785,0.0042034145,0.3904992,0.00012741714,0.0002864394,0.00020616801,0.000002707946,0.00019977019,0.001296367],"genre_scores_gemma":[0.9964004,0.0015470567,0.000864461,0.000030290195,0.00019052961,0.000008646679,3.5985195e-7,0.00008183141,0.0008764128],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9960446,0.00017544,0.00047737328,0.00027409577,0.00047550714,0.0025530024],"domain_scores_gemma":[0.9991188,0.00016764055,0.00015196357,0.00023902176,0.00013172213,0.00019081956],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002611485,0.00028679214,0.00029610953,0.0006170517,0.00022883146,0.00012230812,0.00040363733,0.0001329011,0.000044853045],"category_scores_gemma":[0.0002533165,0.00022361499,0.000096264484,0.0007508053,0.000019249846,0.0005821978,0.00003692309,0.00074511423,0.00004046063],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002687534,0.00044135994,0.10532054,0.00032702563,0.004324476,0.00015923461,0.003182635,0.050671015,0.704808,0.014544061,0.006008187,0.107525945],"study_design_scores_gemma":[0.03412846,0.012679835,0.1372777,0.009350954,0.0023806957,0.040295247,0.0056721396,0.12830049,0.42089638,0.12030301,0.06611489,0.022600196],"about_ca_topic_score_codex":0.000013244709,"about_ca_topic_score_gemma":0.0001068325,"teacher_disagreement_score":0.3932219,"about_ca_system_score_codex":0.0024324406,"about_ca_system_score_gemma":0.0007968461,"threshold_uncertainty_score":0.9118754},"labels":[],"label_agreement":null},{"id":"W2321944543","doi":"10.1109/tste.2014.2339172","title":"Optimal Incentive Design for Targeted Penetration of Renewable Energy Sources","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"IBM Canada; ABB","keywords":"Renewable energy; Incentive; Environmental economics; Energy conservation; Portfolio; Time horizon; Electricity; Market penetration; Wind power; Electricity generation; Distributed generation; Business; Economics; Engineering; Microeconomics; Finance","score_opus":0.005932198490464514,"score_gpt":0.18739253293411784,"score_spread":0.18146033444365334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2321944543","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010948594,0.00017787263,0.99640197,0.00001263757,0.00030349716,0.00019774683,0.000007171242,0.00025038607,0.001553882],"genre_scores_gemma":[0.98323095,0.00007784622,0.009995444,0.000021113012,0.000055150493,0.00028715594,0.000017417762,0.00006810222,0.006246808],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986531,0.00009623807,0.0003649866,0.0002462284,0.00019524647,0.0004441966],"domain_scores_gemma":[0.9990789,0.00021656814,0.00008953492,0.00024807063,0.00028873692,0.00007813232],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024579567,0.00021957573,0.00026968296,0.00037863987,0.0001740989,0.000039772705,0.00015573307,0.0001609445,0.000036251637],"category_scores_gemma":[0.000014660022,0.00024413635,0.000102781385,0.0005764431,0.0000293609,0.00028790472,8.9096807e-7,0.000067728775,9.285423e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008373342,0.00005893212,5.424796e-7,0.00008329252,0.00007580845,8.758991e-7,0.00011696944,0.9899493,0.005539346,0.0014016841,0.0009524589,0.0017370764],"study_design_scores_gemma":[0.00042490422,0.00025183478,0.0000010133938,0.000014830578,0.00003311225,0.0000015024664,0.00017345013,0.53680986,0.45594764,0.00026706237,0.005903903,0.00017090396],"about_ca_topic_score_codex":0.00091372733,"about_ca_topic_score_gemma":0.000097267606,"teacher_disagreement_score":0.9864065,"about_ca_system_score_codex":0.00023443962,"about_ca_system_score_gemma":0.00007732097,"threshold_uncertainty_score":0.99555916},"labels":[],"label_agreement":null},{"id":"W2330052553","doi":"10.18178/ijoee.3.3.145-150","title":"Quarter-Hourly Generation Scheduling of Hydropower Systems Considering Peak Saving Demands among Multiple Provincial Power Grids in Central China","year":2015,"lang":"en","type":"article","venue":"International Journal of Electrical Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Hydropower; China; Environmental science; Scheduling (production processes); Environmental economics; Operations research; Operations management; Engineering; Economics; Geography; Electrical engineering","score_opus":0.008317006959677624,"score_gpt":0.20986122981600674,"score_spread":0.2015442228563291,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2330052553","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.758067,0.0011108549,0.23718682,0.000037459165,0.0028560557,0.00008599945,0.000003659365,0.000042394633,0.0006097739],"genre_scores_gemma":[0.99812645,0.000057803314,0.0010117415,0.000011564019,0.0007189509,0.0000055436903,0.000011625975,0.00003765012,0.00001867356],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997479,0.00011520575,0.0011221374,0.00015843901,0.0007832279,0.00034196198],"domain_scores_gemma":[0.9986986,0.000093465314,0.0004145592,0.00010566951,0.0005107229,0.0001769756],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047077707,0.00019985238,0.00038673467,0.00064909866,0.000022216112,0.00009178864,0.00032220903,0.00015067772,0.00000692507],"category_scores_gemma":[0.00037858103,0.00019670078,0.00011699871,0.00038402283,0.000025254787,0.00054409896,0.000025637077,0.0003101032,8.7597095e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009744229,0.00009671811,0.011138265,0.000010537956,0.00014916969,0.00009594436,0.00040582378,0.97404397,0.011961007,0.0008569707,0.00045530536,0.0006888602],"study_design_scores_gemma":[0.0015410528,0.0002532699,0.0040666214,0.00015441497,0.000018725044,0.00019207071,0.000049319333,0.9859942,0.00719653,0.00005336348,0.000256748,0.00022366122],"about_ca_topic_score_codex":0.0004173382,"about_ca_topic_score_gemma":0.00020338704,"teacher_disagreement_score":0.24005947,"about_ca_system_score_codex":0.000770878,"about_ca_system_score_gemma":0.00021053677,"threshold_uncertainty_score":0.8021225},"labels":[],"label_agreement":null},{"id":"W2330665928","doi":"10.2316/journal.203.2013.2.203-4954","title":"SHORT-TERM HYDROTHERMAL SCHEDULING CONSIDERING VALVE POINT EFFECT USING ACCELERATION-BASED PSO ALGORITHM","year":2013,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Acceleration; Term (time); Scheduling (production processes); Hydrothermal circulation; Computer science; Algorithm; Control theory (sociology); Mathematical optimization; Mathematics; Engineering; Artificial intelligence; Physics; Chemical engineering; Control (management)","score_opus":0.007882445205234663,"score_gpt":0.22483631219926137,"score_spread":0.21695386699402672,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2330665928","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33110097,0.0017086274,0.66268617,0.000029935973,0.0037111242,0.000096991134,0.000003753721,0.000064111846,0.0005983194],"genre_scores_gemma":[0.9962676,0.000032787855,0.0031560787,0.000031783307,0.00043599936,0.000010937091,0.000005154519,0.000041955278,0.000017673425],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985218,0.000080923535,0.0006490555,0.00012558312,0.000424355,0.0001982889],"domain_scores_gemma":[0.9991275,0.00012188425,0.00017081016,0.0000963819,0.00036623157,0.000117169104],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030566324,0.000197466,0.000296001,0.00033195427,0.000049837872,0.00032162576,0.00019098812,0.00008632177,0.000039002796],"category_scores_gemma":[0.000027711314,0.00017811931,0.0001303045,0.00009306956,0.000020747997,0.0005741445,0.000019100797,0.00014668315,0.0000034438863],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010322731,0.000018796369,0.004222208,0.000036627203,0.00048571377,0.000046046902,0.00016274612,0.9787106,0.011096995,0.0000950257,0.00009489792,0.0050200284],"study_design_scores_gemma":[0.0005606979,0.000063753105,0.00059329986,0.00032379024,0.000029582301,0.0006115943,0.000039427126,0.9933133,0.0040818728,0.000009908201,0.0001818883,0.00019086055],"about_ca_topic_score_codex":0.000116158975,"about_ca_topic_score_gemma":0.0000014580477,"teacher_disagreement_score":0.6651666,"about_ca_system_score_codex":0.00020939528,"about_ca_system_score_gemma":0.000041982916,"threshold_uncertainty_score":0.7263495},"labels":[],"label_agreement":null},{"id":"W2334836146","doi":"10.2316/journal.203.2011.2.203-4496","title":"PROFIT–BASED UNIT COMMITMENT PROBLEM WITH BILATERAL CONTRACTS","year":2011,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Power system simulation; Mathematical optimization; Profit (economics); Linear programming; Integer programming; Computer science; Binary number; Dual (grammatical number); Unit (ring theory); Operations research; Power (physics); Electric power system; Economics; Mathematics; Microeconomics","score_opus":0.010265113409197208,"score_gpt":0.19099602873817167,"score_spread":0.18073091532897448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2334836146","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30617395,0.0044958415,0.57983905,0.000317751,0.010572865,0.00044831831,0.000034455603,0.00031580223,0.09780198],"genre_scores_gemma":[0.9985865,0.000031766736,0.0010087066,0.000035262023,0.00010021341,0.000008670323,0.0000041909393,0.000022200162,0.00020249002],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99903154,0.000039156705,0.00039972374,0.00007381282,0.00032341277,0.00013237636],"domain_scores_gemma":[0.99927944,0.00002436624,0.000179872,0.00007240699,0.0003553665,0.000088526314],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018018458,0.00012536685,0.00018418115,0.00021268571,0.000019052934,0.00006651999,0.00017487706,0.00005223301,0.000019845327],"category_scores_gemma":[0.000004299667,0.00009201842,0.000034672626,0.000077360564,0.000017647237,0.00023079138,0.000008505116,0.00008944633,0.000001595407],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021111139,0.0007251515,0.12996782,0.0004090752,0.0074891793,0.0025158038,0.00981157,0.7795448,0.006218755,0.04415043,0.008585501,0.008470831],"study_design_scores_gemma":[0.027564852,0.0068214154,0.052819815,0.007138372,0.0005947327,0.015107333,0.0016468699,0.61666816,0.030247085,0.0007243307,0.23704042,0.0036266122],"about_ca_topic_score_codex":0.00010353327,"about_ca_topic_score_gemma":0.000008845162,"teacher_disagreement_score":0.69241256,"about_ca_system_score_codex":0.000075607066,"about_ca_system_score_gemma":0.00003925949,"threshold_uncertainty_score":0.3752402},"labels":[],"label_agreement":null},{"id":"W2343330772","doi":"10.1109/tpwrs.2015.2512990","title":"Energy-Centric Flexibility Management in Power Systems","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":58,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Group for Research in Decision Analysis","funders":"","keywords":"Flexibility (engineering); Electric power system; Renewable energy; Energy storage; Reliability engineering; Computer science; Exploit; Demand response; Electricity generation; Energy management; Power management; Power (physics); Risk analysis (engineering); Environmental economics; Engineering; Energy (signal processing); Business; Electrical engineering; Economics; Electricity; Computer security","score_opus":0.008500344302315548,"score_gpt":0.20198371306668708,"score_spread":0.19348336876437153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2343330772","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029042433,0.0009241939,0.97027844,0.000031435975,0.008458327,0.0008448754,0.000048582864,0.0007807853,0.015729144],"genre_scores_gemma":[0.99521965,0.00021656264,0.000060022398,0.000014847623,0.000012234453,0.00042621922,0.0000020642383,0.00009960338,0.003948799],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971492,0.00020821593,0.0008917647,0.0005568192,0.00052923715,0.0006647545],"domain_scores_gemma":[0.998667,0.0001268501,0.00009556486,0.0008527036,0.00008239375,0.00017547751],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00046047408,0.00041083677,0.00047252257,0.00078209187,0.00008322823,0.00010055605,0.00031813586,0.00024266762,0.0000852419],"category_scores_gemma":[0.0000028334744,0.00033743872,0.00013668874,0.0010356421,0.000030161003,0.00034454186,0.0000019783101,0.0001802321,0.0002634385],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000117253396,0.0005373215,0.00013960192,0.00056776166,0.0006077925,0.00012724339,0.00048283557,0.98463476,0.0017914091,0.0035051866,0.004772692,0.002716125],"study_design_scores_gemma":[0.016709913,0.0013768524,0.0011404435,0.006562226,0.00046205957,0.0006388952,0.0018599592,0.7749402,0.019469148,0.00014663846,0.1698336,0.0068600676],"about_ca_topic_score_codex":0.00013584291,"about_ca_topic_score_gemma":0.000025327381,"teacher_disagreement_score":0.9923154,"about_ca_system_score_codex":0.0010789239,"about_ca_system_score_gemma":0.000027166916,"threshold_uncertainty_score":0.9999078},"labels":[],"label_agreement":null},{"id":"W2343534374","doi":"10.1109/pes.2009.5275410","title":"A planning model for investor firms in the generation sector and financial analysis","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Time horizon; Electricity; Volatility (finance); Electricity market; Investment (military); Electricity generation; Rate of return; Business; Return on investment; Industrial organization; Finance; Economics; Environmental economics; Microeconomics; Engineering; Production (economics)","score_opus":0.023887201782547152,"score_gpt":0.22728294914386243,"score_spread":0.20339574736131527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2343534374","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20248844,0.00014252437,0.7967956,0.000054083273,0.000020550375,0.00014379727,0.0000014903151,0.000040423314,0.00031307695],"genre_scores_gemma":[0.99225175,0.0000043262794,0.0074202404,0.00017565548,0.000049905902,0.000022978662,0.00001577052,0.000004163412,0.00005519911],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996709,0.000009285421,0.00010658671,0.000074240554,0.00005017087,0.00008879141],"domain_scores_gemma":[0.99988186,0.000018323499,0.000010873154,0.000066310975,0.000010372826,0.0000122752235],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012593681,0.00005351898,0.00008029657,0.00012257024,0.000026725722,0.00002729169,0.000038441365,0.000038773996,0.0000013194413],"category_scores_gemma":[0.000020896994,0.000040956827,0.000020534002,0.00034139832,0.0000019174374,0.00007779661,0.0000013030453,0.000033593067,2.0675928e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014686133,0.0000032223015,0.00025568326,0.0000037637049,0.000007599875,2.1505437e-7,0.0010950586,0.9961,0.0005757841,0.00039212988,0.0012208329,0.00034421493],"study_design_scores_gemma":[0.00011706996,0.000016254447,0.0016895506,0.0000019913493,0.000025099029,5.69691e-7,0.00000850443,0.99781924,0.00013295347,0.000100837344,0.000033601416,0.000054328375],"about_ca_topic_score_codex":0.000005299776,"about_ca_topic_score_gemma":0.00008483829,"teacher_disagreement_score":0.78976333,"about_ca_system_score_codex":0.000026104892,"about_ca_system_score_gemma":0.0000080228165,"threshold_uncertainty_score":0.16701709},"labels":[],"label_agreement":null},{"id":"W2345202997","doi":"10.5281/zenodo.47452","title":"assigner: easier gsi_sim install","year":2016,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Computer science","score_opus":0.016598232701686363,"score_gpt":0.1966305527669061,"score_spread":0.18003232006521974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2345202997","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015321386,0.00025824993,0.36756992,0.00062229286,0.00045654655,0.0006570366,0.00015404957,0.0060867993,0.6088737],"genre_scores_gemma":[0.9957751,0.00011864505,0.0003158358,0.00003980696,0.00012642125,5.5078562e-8,0.00018794747,0.0016282114,0.0018079539],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987304,0.00013933625,0.00022842205,0.00025546225,0.00027813128,0.0003682009],"domain_scores_gemma":[0.9991479,0.000022953882,0.00004298235,0.0003833251,0.000253469,0.00014937708],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00035516685,0.00013913964,0.00012256044,0.00020817318,0.00056294515,0.00028802373,0.0005844736,0.00007440771,0.008035477],"category_scores_gemma":[0.0002731648,0.00012025102,0.000037956743,0.00045502817,0.000054845914,0.00034699566,0.00024188236,0.00012112725,0.01132692],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037273763,0.00007639831,0.000013273649,0.00011837982,0.00012433564,0.000024515313,0.0009336355,0.0021560153,0.05653428,0.006605166,0.55537546,0.37800127],"study_design_scores_gemma":[0.00049195666,0.00008526618,0.00017931453,0.00004388944,0.000007766801,0.00006803666,0.000031203574,0.0025695101,0.0019513812,0.000080693564,0.99428195,0.00020904247],"about_ca_topic_score_codex":0.0000020623602,"about_ca_topic_score_gemma":1.0871403e-7,"teacher_disagreement_score":0.9804537,"about_ca_system_score_codex":0.00026007797,"about_ca_system_score_gemma":0.0000022186364,"threshold_uncertainty_score":0.9928713},"labels":[],"label_agreement":null},{"id":"W2351307490","doi":"10.5547/01956574.37.2.ddup","title":"Short-term Hedging for an Electricity Retailer","year":2015,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Stylized fact; Futures contract; Spot contract; Electricity market; Electricity; Economics; Spot market; Term (time); Database transaction; Econometrics; Financial economics; Microeconomics; Computer science","score_opus":0.029961928701228838,"score_gpt":0.24204245817883469,"score_spread":0.21208052947760586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2351307490","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08224319,0.0012055447,0.9110245,0.00006802299,0.0008908683,0.000076975804,9.700959e-7,0.00018067608,0.0043092715],"genre_scores_gemma":[0.9980447,0.00005413475,0.00090068096,0.000035591827,0.00067786704,0.000011117175,0.000004191688,0.000037436967,0.00023427808],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992124,0.000062647894,0.00020608101,0.000075300515,0.00016916533,0.00027444266],"domain_scores_gemma":[0.999521,0.00003024597,0.000037354843,0.00016569637,0.00010626369,0.00013944552],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005805649,0.00010522617,0.000117758085,0.000081833525,0.0001227516,0.000092966606,0.00023628907,0.000053090305,0.0000052119726],"category_scores_gemma":[0.00003226598,0.000076289994,0.000047975376,0.00017726254,0.000008897316,0.00022943896,0.000008988914,0.00015952796,0.0000022050701],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006635959,0.000040452258,0.00084977015,0.000017338845,0.00018595012,0.0000126579325,0.0010979546,0.91349584,0.009030695,0.0028998938,0.03026123,0.042041875],"study_design_scores_gemma":[0.00063168583,0.00019740283,0.0004055307,0.000028047829,0.000057919013,0.0008671754,0.00007769915,0.97258717,0.011757819,0.0016201092,0.011432571,0.00033687646],"about_ca_topic_score_codex":0.0000031842746,"about_ca_topic_score_gemma":0.0000074410455,"teacher_disagreement_score":0.9158015,"about_ca_system_score_codex":0.00015233635,"about_ca_system_score_gemma":0.000038229166,"threshold_uncertainty_score":0.3111016},"labels":[],"label_agreement":null},{"id":"W2364092517","doi":"","title":"Incorporating Reliability Component in Transmission Service Rate Design","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Ministry of Education and Child Care","funders":"","keywords":"Wheeling; Component (thermodynamics); Reliability (semiconductor); Reliability engineering; Transmission system; Transmission (telecommunications); Computer science; Investment (military); Incentive; Engineering; Economics; Telecommunications; Power (physics); Microeconomics","score_opus":0.008181634598021672,"score_gpt":0.18458770764470253,"score_spread":0.17640607304668085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2364092517","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07298233,0.00006808288,0.91993976,0.000114443406,0.00006838912,0.0002793975,3.3186097e-7,0.00035605315,0.006191187],"genre_scores_gemma":[0.9587054,0.0000036902818,0.04115046,0.000025240362,0.000016282242,0.000015539494,0.000010103667,0.000018438897,0.000054802953],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922997,0.000098620316,0.0003034759,0.00012947191,0.00008526656,0.00015317551],"domain_scores_gemma":[0.9997145,0.00007313695,0.00002336074,0.0001280853,0.00003331527,0.000027595855],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004660137,0.000100172896,0.000120455414,0.00007435202,0.000022700688,0.000017773285,0.00007178533,0.000061232065,0.000021426595],"category_scores_gemma":[0.000006014049,0.000095575975,0.000014527904,0.00047304612,0.0000035281817,0.00012644578,0.000005261533,0.00008702023,0.000018373237],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000052419236,0.000018623938,0.00072611414,0.000055454395,0.0000010498528,0.0000021353324,0.000038205482,0.9790678,0.019335698,0.0000917771,0.00026385617,0.00039402655],"study_design_scores_gemma":[0.0002612588,0.000009477243,0.003547653,0.000033498167,0.0000021345256,0.0000016329127,0.0000057367133,0.97900546,0.016446246,0.00044088528,0.0001292895,0.0001167141],"about_ca_topic_score_codex":0.00040498062,"about_ca_topic_score_gemma":0.000080184145,"teacher_disagreement_score":0.8857231,"about_ca_system_score_codex":0.00012834932,"about_ca_system_score_gemma":0.000014860843,"threshold_uncertainty_score":0.38974753},"labels":[],"label_agreement":null},{"id":"W236455485","doi":"","title":"Performance-Based Regulation of Utilities","year":2002,"lang":"en","type":"article","venue":"Energy law journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Commission; Incentive; Service (business); Deregulation; Economics; Energy law; Public economics; Business; Finance; Law; Political science; Economy; Microeconomics","score_opus":0.008057371707353957,"score_gpt":0.1564940778776822,"score_spread":0.14843670617032823,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W236455485","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23897299,0.0036161493,0.2650787,0.00009763616,0.0019090598,0.0000741421,0.0000034366938,0.00037601203,0.4898719],"genre_scores_gemma":[0.99856645,0.00010640719,0.00087540224,0.000011664918,0.00010226776,0.0000014568947,0.000001793479,0.000014094626,0.00032049048],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994739,0.00002054453,0.00020894989,0.000037358426,0.0001441856,0.00011501348],"domain_scores_gemma":[0.9997678,0.000015868723,0.000050126506,0.00008179575,0.000050074093,0.00003437941],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007946256,0.000062438565,0.00008751046,0.000075857984,0.00006664177,0.000015584528,0.000061291554,0.000040963565,0.00031217886],"category_scores_gemma":[0.0000039969095,0.000060234866,0.000033528213,0.00011681063,0.000015840773,0.00015781545,0.0000023553878,0.00006432631,0.0000037822563],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000037181883,0.0000113437445,0.0002359951,0.000028116936,0.000020907997,0.0000010761381,0.00007301707,0.98493135,0.0011304547,0.0052137063,0.0011636328,0.007186663],"study_design_scores_gemma":[0.00023092714,0.000036929338,0.00042503452,0.000044047323,0.000006619031,0.00003636835,0.0000060642205,0.96873915,0.023351975,0.000058435315,0.0069926362,0.00007179813],"about_ca_topic_score_codex":0.000010690489,"about_ca_topic_score_gemma":0.00001316619,"teacher_disagreement_score":0.7595934,"about_ca_system_score_codex":0.00005353383,"about_ca_system_score_gemma":0.0000042841148,"threshold_uncertainty_score":0.34181398},"labels":[],"label_agreement":null},{"id":"W2375113873","doi":"","title":"Energy efficiency technologies in Canada","year":2011,"lang":"en","type":"article","venue":"Power Demand Side Management","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Energy conservation; Energy security; Hydroelectricity; Business; Context (archaeology); Government (linguistics); Environmental economics; Renewable energy; Natural resource economics; Wind power; Economic shortage; Natural resource; Environmental resource management; Economics; Engineering; Political science; Geography","score_opus":0.00526229475731108,"score_gpt":0.15182498552619073,"score_spread":0.14656269076887965,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2375113873","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028233247,0.0026948852,0.31407073,0.0000696142,0.0010118855,0.00038259054,0.0000020392833,0.0009290712,0.65260595],"genre_scores_gemma":[0.99881375,0.00013816825,0.00072545046,0.000024678538,0.0000026402927,0.00004612474,0.0000014001897,0.000016995753,0.00023078259],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991853,0.000011769721,0.00021727153,0.00015541418,0.00014726228,0.0002829573],"domain_scores_gemma":[0.99969643,0.000010251542,0.000021689675,0.00023904785,0.000009939897,0.000022645549],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008486309,0.00012082093,0.00012384097,0.0001955028,0.000019259774,0.00000979125,0.0002034169,0.000033390803,0.000035814053],"category_scores_gemma":[0.0000042064908,0.0001200555,0.000015580665,0.00037611916,0.000007672258,0.00005632634,0.00005330311,0.000055636898,0.000008679388],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000629706,0.00037723428,0.06293479,0.0010723796,0.0008605522,0.0030197348,0.0033694461,0.56188786,0.00033275218,0.12680522,0.060951043,0.17832601],"study_design_scores_gemma":[0.0038759585,0.0002695655,0.07689818,0.000557317,0.00016762123,0.00006055683,0.0073123984,0.77401334,0.032264397,0.008407157,0.092342384,0.003831107],"about_ca_topic_score_codex":0.10974081,"about_ca_topic_score_gemma":0.3078864,"teacher_disagreement_score":0.9705805,"about_ca_system_score_codex":0.00036599018,"about_ca_system_score_gemma":0.000022841183,"threshold_uncertainty_score":0.8961875},"labels":[],"label_agreement":null},{"id":"W2414932321","doi":"10.1016/j.ifacol.2015.08.205","title":"Predicting Electricity Pool Prices Using Hidden Markov Models∗∗This work is supported in part by NSERC and AITF.","year":2015,"lang":"en","type":"article","venue":"IFAC-PapersOnLine","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Hidden Markov model; Electricity price forecasting; Electricity price; Econometrics; Electricity; Electricity market; Work (physics); Operator (biology); Preprocessor; Markov chain; Economics; Computer science; Spot contract; Operations research; Engineering; Financial economics; Artificial intelligence; Machine learning","score_opus":0.019430646686132664,"score_gpt":0.22124764217182916,"score_spread":0.20181699548569648,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2414932321","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.978296,0.004260873,0.013711728,0.00019934999,0.0003618568,0.0005127037,0.000054964956,0.00047770812,0.0021248478],"genre_scores_gemma":[0.92775404,0.00037300726,0.070599206,0.00017530014,0.00026335087,0.000028171844,0.00011687748,0.000116463794,0.0005735754],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980854,0.000065491615,0.0005075857,0.0003944795,0.00036845967,0.0005785982],"domain_scores_gemma":[0.9992566,0.000076669094,0.000112454756,0.00024227332,0.000093336064,0.00021867166],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004520309,0.0003134371,0.00038439437,0.00021941823,0.000063821164,0.00007505863,0.00017463266,0.00023544392,0.000043567048],"category_scores_gemma":[0.000082669976,0.00033536603,0.000042466363,0.0010557829,0.00002289399,0.00050112297,0.000043793687,0.0002965131,0.0000067936808],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009503464,0.0011332774,0.41161337,0.0017133727,0.001536543,0.0003482455,0.041687734,0.38221976,0.047231432,0.00005268366,0.021656536,0.089856684],"study_design_scores_gemma":[0.00084094406,0.000054433975,0.00026917525,0.00013026746,0.00004753555,0.00002880534,0.00014960511,0.9965521,0.0012223506,0.00002119026,0.000300644,0.00038293327],"about_ca_topic_score_codex":0.0003085755,"about_ca_topic_score_gemma":0.00007658774,"teacher_disagreement_score":0.6143324,"about_ca_system_score_codex":0.0003577493,"about_ca_system_score_gemma":0.000082063874,"threshold_uncertainty_score":0.9999098},"labels":[],"label_agreement":null},{"id":"W2419231748","doi":"10.1016/j.energy.2016.05.018","title":"Inexact stochastic risk-aversion optimal day-ahead dispatch model for electricity system management with wind power under uncertainty","year":2016,"lang":"en","type":"article","venue":"Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"China Postdoctoral Science Foundation; National Natural Science Foundation of China","keywords":"Economic dispatch; Stochastic programming; Electricity market; Wind power; Electric power system; Electricity; Demand response; Mathematical optimization; Computer science; Interval (graph theory); Robust optimization; Operations research; Risk management; Reliability engineering; Engineering; Power (physics); Economics; Finance; Mathematics","score_opus":0.004602122078304065,"score_gpt":0.17813763044576372,"score_spread":0.17353550836745965,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2419231748","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01892026,0.00011628579,0.978799,0.000025180816,0.00019802277,0.0003285247,0.000027391325,0.00039929326,0.0011860555],"genre_scores_gemma":[0.99544555,0.0000294762,0.0031566555,0.000015711881,0.000049415143,0.00008012322,0.000020655605,0.000080978556,0.0011214174],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985894,0.000045876735,0.0002620684,0.00034498933,0.00027863367,0.00047906066],"domain_scores_gemma":[0.99926424,0.00011226656,0.00009366625,0.00034613532,0.00007699428,0.00010672469],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019542874,0.00027202556,0.00025523617,0.00017934862,0.00010420129,0.0000305275,0.0001885493,0.00011017175,0.000009230339],"category_scores_gemma":[0.000011311853,0.00019183141,0.00006464604,0.00031054582,0.000016102264,0.00017352044,0.00002993494,0.000071834074,0.000008477873],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008200285,0.000021364336,0.000018515868,0.00005194796,0.00014517765,0.0000028236268,0.00005025676,0.9932946,0.00017937967,0.00424199,0.0007145269,0.0011974038],"study_design_scores_gemma":[0.0011933976,0.00013030022,0.00004967482,0.00017080436,0.00007840396,0.000006448778,0.00004110527,0.99749386,0.00027921153,0.00005284074,0.00019499644,0.00030896266],"about_ca_topic_score_codex":0.000060479,"about_ca_topic_score_gemma":0.00003807037,"teacher_disagreement_score":0.9765253,"about_ca_system_score_codex":0.00070994796,"about_ca_system_score_gemma":0.000030950967,"threshold_uncertainty_score":0.7822657},"labels":[],"label_agreement":null},{"id":"W2461023523","doi":"10.1007/s11149-017-9323-0","title":"Electricity market mergers with endogenous forward contracting","year":2017,"lang":"en","type":"article","venue":"Journal of Regulatory Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Forward contract; Economics; Incentive; Microeconomics; Market power; Forward market; Electricity; Electricity market; Industrial organization; Public finance; Monetary economics; Business; Financial economics; Macroeconomics","score_opus":0.009595190925939242,"score_gpt":0.1827651827767421,"score_spread":0.17316999185080287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2461023523","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9653498,0.00058745954,0.012907272,0.000056626704,0.00089525775,0.00013157939,0.0000026171963,0.00004405805,0.020025339],"genre_scores_gemma":[0.9978122,0.00027885468,0.0015227146,0.000013212414,0.00022253966,0.0000013526964,3.0509943e-7,0.000040208462,0.000108593056],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99914074,0.00001879819,0.00043701704,0.0000869323,0.00008391294,0.00023257566],"domain_scores_gemma":[0.99874,0.000054072738,0.0007276362,0.00027244625,0.0000981492,0.00010769623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00053248764,0.0001370715,0.00032748238,0.00012909074,0.00015965085,0.00012249648,0.00027392368,0.00007905302,0.000022264094],"category_scores_gemma":[0.000063514715,0.0001286779,0.00009110915,0.000032382108,0.000026704356,0.0006256261,0.000010608094,0.00020239344,0.0000027458175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005369369,0.00008511902,0.030465199,0.00019247181,0.0020917389,0.00019725901,0.0004340668,0.9034736,0.0073650903,0.0005669662,0.009102587,0.04548895],"study_design_scores_gemma":[0.007499609,0.0010398469,0.04247224,0.0003622877,0.0005872839,0.0050148084,0.00023839441,0.82373804,0.080286786,0.00043744565,0.036474716,0.0018485134],"about_ca_topic_score_codex":0.0000035554876,"about_ca_topic_score_gemma":0.0000079032525,"teacher_disagreement_score":0.07973555,"about_ca_system_score_codex":0.00033275792,"about_ca_system_score_gemma":0.00009849447,"threshold_uncertainty_score":0.52473325},"labels":[],"label_agreement":null},{"id":"W2469738517","doi":"10.1002/wene.220","title":"Hydro power flexibility for power systems with variable renewable energy sources: an IEA Task 25 collaboration","year":2016,"lang":"en","type":"article","venue":"Wiley Interdisciplinary Reviews Energy and Environment","topic":"Electric Power System Optimization","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Renewable energy; Variable renewable energy; Wind power; Electric power system; Variable (mathematics); Pumped-storage hydroelectricity; Flexibility (engineering); Inflow; Electricity generation; Grid; Solar power; Environmental science; Computer science; Energy storage; Power (physics); Distributed generation; Engineering; Meteorology; Electrical engineering; Economics","score_opus":0.00850343474755512,"score_gpt":0.21370510767597067,"score_spread":0.20520167292841557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2469738517","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0027676646,0.021496331,0.9698594,0.000115465395,0.0004822046,0.000647502,0.000055931672,0.00023421556,0.0043412345],"genre_scores_gemma":[0.9844386,0.008264984,0.002405693,0.00006260766,0.000102798986,0.0010852357,0.00009129826,0.00012686446,0.0034219183],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99799484,0.00016819546,0.00066022965,0.0005786469,0.00019387032,0.00040421198],"domain_scores_gemma":[0.9988723,0.00006961189,0.0001768129,0.00066570524,0.000027554532,0.00018804042],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004988354,0.00038809414,0.0005418353,0.000091155656,0.00019299179,0.00007289752,0.00019054452,0.00016796484,0.00012103615],"category_scores_gemma":[0.000008416853,0.00025819725,0.00006555506,0.00017674801,0.00006982496,0.0005217689,0.000110541725,0.000047430945,0.000009925623],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005264576,0.000563157,0.00041802143,0.0008828253,0.0005622983,0.000013788962,0.002197128,0.9131763,0.023072403,0.005233421,0.039147776,0.0142064085],"study_design_scores_gemma":[0.0012930803,0.0016754945,0.000032045475,0.0014862292,0.00015049636,0.000061006518,0.00021913083,0.071690984,0.0016701793,0.0009968395,0.9197261,0.0009984293],"about_ca_topic_score_codex":0.000039918505,"about_ca_topic_score_gemma":0.00006730147,"teacher_disagreement_score":0.9816709,"about_ca_system_score_codex":0.0003432615,"about_ca_system_score_gemma":0.000022407523,"threshold_uncertainty_score":0.999987},"labels":[],"label_agreement":null},{"id":"W2475297401","doi":"10.1007/978-3-319-30235-5_11","title":"Economic Load Dispatch Using Hybrid MpBBO-SQP Algorithm","year":2016,"lang":"en","type":"book-chapter","venue":"Studies in computational intelligence","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Sequential quadratic programming; Mathematical optimization; Computer science; Simulated annealing; Population; Algorithm; Economic dispatch; Power (physics); Mathematics; Electric power system; Quadratic programming","score_opus":0.044463108533586204,"score_gpt":0.3011247273872216,"score_spread":0.2566616188536354,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2475297401","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000029484328,0.0104332045,0.9189771,0.00003210398,0.0026708997,0.00034924567,0.0001454985,0.0001791068,0.06718339],"genre_scores_gemma":[0.47459376,0.04108871,0.2959427,0.00036130365,0.006031513,0.00033127214,0.00048086658,0.0016012962,0.17956857],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981603,0.00001742916,0.0007527471,0.00043828625,0.0003143198,0.00031688774],"domain_scores_gemma":[0.99888784,0.00045203787,0.00016443602,0.00021713623,0.00022559949,0.000052956908],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002219546,0.00043198248,0.0005406337,0.0002596863,0.00007362269,0.000028478313,0.00027015503,0.00013164803,0.00010415009],"category_scores_gemma":[0.000033655728,0.00043542578,0.00010405504,0.000050643383,0.00015908667,0.00014318782,0.00011858016,0.00026351103,0.00035241107],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003391929,0.0000057957336,0.000012049292,0.000116393196,0.00028027952,0.00003044488,0.00018025539,0.9462243,7.060583e-7,0.024319401,0.00090811105,0.02791893],"study_design_scores_gemma":[0.000093202085,0.00003412906,0.0000039062816,0.0009954587,0.00003328404,0.00005915467,0.000032516782,0.88092875,0.000054049953,0.11404686,0.0030866163,0.0006320434],"about_ca_topic_score_codex":0.000008650185,"about_ca_topic_score_gemma":0.000027678345,"teacher_disagreement_score":0.62303436,"about_ca_system_score_codex":0.002518543,"about_ca_system_score_gemma":0.00016661905,"threshold_uncertainty_score":0.99980974},"labels":[],"label_agreement":null},{"id":"W2484703896","doi":"10.1109/tpwrs.2016.2597338","title":"A Robust Linear Approach for Offering Strategy of a Hybrid Electric Energy Company","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Bidding; Bilevel optimization; Mathematical optimization; Maximization; Duality (order theory); Computer science; Electricity market; Linear programming; Strong duality; Robust optimization; Energy management; Electricity; Energy (signal processing); Optimization problem; Economics; Engineering; Mathematics; Microeconomics","score_opus":0.019455812730681202,"score_gpt":0.19889421368284552,"score_spread":0.17943840095216432,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2484703896","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034128511,0.00035927843,0.9926971,0.0000053748604,0.001057102,0.00055288465,0.00008477947,0.0003990818,0.0014315319],"genre_scores_gemma":[0.9975885,0.00005982465,0.0012766827,0.0000040333966,0.000029533456,0.00033408834,0.000004896469,0.00009660336,0.00060585124],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983546,0.00006450006,0.0006021909,0.00030758025,0.00025349265,0.0004175941],"domain_scores_gemma":[0.9991112,0.00014623892,0.00010922106,0.0003896982,0.0001406737,0.00010300446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019892116,0.00027908597,0.00045006615,0.0004043377,0.000072220064,0.000028020333,0.00021089235,0.000107386215,0.000012760428],"category_scores_gemma":[0.000003976669,0.0002306339,0.00016402784,0.00046403115,0.00001902086,0.0001820384,5.7800463e-7,0.00010410183,0.000007196556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044919758,0.00010103996,0.0000019099423,0.00021990253,0.00017871908,0.0000014463816,0.000043902728,0.97007966,0.02769429,0.00019145642,0.0003714529,0.0010713178],"study_design_scores_gemma":[0.000931886,0.0002590632,0.000004095652,0.00015332577,0.000050205028,0.00006701355,0.000031904947,0.87596655,0.12156081,0.0000041976373,0.0006447201,0.00032623968],"about_ca_topic_score_codex":0.000048557755,"about_ca_topic_score_gemma":0.0000035765584,"teacher_disagreement_score":0.9941756,"about_ca_system_score_codex":0.00020962804,"about_ca_system_score_gemma":0.000048958456,"threshold_uncertainty_score":0.94049776},"labels":[],"label_agreement":null},{"id":"W2495613095","doi":"10.1017/cbo9780511613807.025","title":"Institutional or structural: lessons from international electricity sector reforms","year":2002,"lang":"en","type":"book-chapter","venue":"Cambridge University Press eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":42,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Restructuring; Private sector; Business; Dominance (genetics); Electricity; China; Investment (military); State owned; Mains electricity; Economic policy; Developing country; Market economy; Economic growth; Economics; Finance; Power (physics); Politics; Political science; Engineering","score_opus":0.02220294041908264,"score_gpt":0.194187162662625,"score_spread":0.17198422224354237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2495613095","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003121057,0.00017892005,0.008980304,0.00001248809,0.0011827408,0.00032360048,0.0010894127,0.00059454417,0.9873259],"genre_scores_gemma":[0.022605026,0.0002892529,0.00042603514,0.000022682601,0.00038007917,0.0000015160275,0.00054087956,0.00008320907,0.9756513],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986067,0.000016797836,0.0002678787,0.00042719487,0.00039260878,0.00028880968],"domain_scores_gemma":[0.9991327,0.000051377574,0.0001464162,0.0003780479,0.00015277707,0.00013869679],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000039491915,0.00042375515,0.00037398023,0.00031135962,0.00015434789,0.00007610304,0.00060492853,0.00047413306,0.00009355441],"category_scores_gemma":[0.000012590311,0.00043500136,0.00015065732,0.000025297959,0.00007812105,0.00021805802,0.00012677262,0.00057090796,0.000029818118],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020062909,0.000012220289,0.0000073715782,0.00014167093,0.0014218811,0.00066462235,0.000110419496,0.008000528,0.00020052027,0.9074018,0.07748353,0.0043547926],"study_design_scores_gemma":[0.0007630605,0.000030026837,0.00003707851,0.00016763237,0.0001439072,0.0000548983,0.000003534834,0.05283261,0.0003897202,0.000011720475,0.94486487,0.00070095994],"about_ca_topic_score_codex":0.00015181555,"about_ca_topic_score_gemma":0.00001069917,"teacher_disagreement_score":0.9073901,"about_ca_system_score_codex":0.0013138963,"about_ca_system_score_gemma":0.00009374124,"threshold_uncertainty_score":0.99981016},"labels":[],"label_agreement":null},{"id":"W2499015274","doi":"10.1109/tste.2016.2598265","title":"Estimating the Price Impact of Proposed Wind Farms in Competitive Electricity Markets","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Electricity; Wind power; Electricity market; Electricity price; Electricity retailing; Electricity generation; Grid; Electricity price forecasting; Stand-alone power system; Environmental economics; Offshore wind power; Renewable energy; Business; Environmental science; Natural resource economics; Economics; Econometrics; Engineering; Distributed generation; Power (physics); Electrical engineering; Mathematics","score_opus":0.0037995282291013537,"score_gpt":0.20542203338581502,"score_spread":0.20162250515671368,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2499015274","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08728269,0.00006626575,0.9081838,0.000037920923,0.00013300567,0.00026783656,0.000006236741,0.00012779822,0.0038944334],"genre_scores_gemma":[0.9984087,0.00003436983,0.0003889742,0.0000072327093,0.000020237223,0.000035920417,8.6188106e-7,0.00003922443,0.0010644828],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986992,0.0001122938,0.00032995778,0.00018526812,0.00019885921,0.0004744428],"domain_scores_gemma":[0.99915856,0.00029770783,0.00007486297,0.0002575539,0.00015879486,0.00005252403],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028791552,0.00019263545,0.00022552743,0.00034204946,0.00009390198,0.00002143729,0.00017881447,0.00009166587,0.00006263415],"category_scores_gemma":[0.000026804899,0.000121963254,0.0000983793,0.001111572,0.000039100505,0.00023657441,0.0000011974901,0.00014711496,0.0000024775181],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000723395,0.00008224957,0.00006722879,0.000057995894,0.00008237626,0.000012075587,0.00018552964,0.9881843,0.003957266,0.00048069365,0.00003814999,0.0067798276],"study_design_scores_gemma":[0.0027502629,0.000650096,0.0030950129,0.00033590925,0.000064682776,0.000051811516,0.0005219484,0.78579915,0.20474492,0.00083783054,0.00039537752,0.0007529849],"about_ca_topic_score_codex":0.00036236964,"about_ca_topic_score_gemma":0.000045537607,"teacher_disagreement_score":0.911126,"about_ca_system_score_codex":0.0009226542,"about_ca_system_score_gemma":0.00014729062,"threshold_uncertainty_score":0.49735174},"labels":[],"label_agreement":null},{"id":"W2499636022","doi":"","title":"Modelling Dependence of Extreme Price Observations in Connected Electricity Markets Using Tail Copulas","year":2012,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Tail dependence; Econometrics; Electricity; Economics; Extreme value theory; Electricity market; Tail risk; Financial economics; Mathematics; Physics; Statistics; Multivariate statistics","score_opus":0.035872564855718846,"score_gpt":0.2244999905660235,"score_spread":0.18862742571030464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2499636022","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4783289,0.0047248723,0.51638556,0.000009433148,0.0001465925,0.00013166932,9.2393844e-7,0.000052140367,0.00021993594],"genre_scores_gemma":[0.993954,0.0018507534,0.003974187,0.0000071456207,0.00010292949,0.0000058958703,0.000004310997,0.000049510858,0.000051261984],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.996519,0.00014298438,0.0006493695,0.00014305071,0.00033282168,0.002212774],"domain_scores_gemma":[0.999259,0.00009405654,0.00021380172,0.00017739175,0.00015648296,0.00009927116],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018341965,0.00020629355,0.00029519873,0.00038453352,0.00009420898,0.00002520118,0.00024834753,0.00013964275,0.00001421358],"category_scores_gemma":[0.00011896314,0.0002270156,0.0000710443,0.0012313725,0.000013958257,0.00071379484,0.000017332664,0.0012446665,0.0000031338382],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028995977,0.00007608607,0.019002812,0.0000379389,0.000103993625,0.0000015374073,0.00023471938,0.96119153,0.011172185,0.007605941,0.000016021635,0.00052821735],"study_design_scores_gemma":[0.0004928939,0.00003920041,0.0012765159,0.000072285955,0.000036408248,0.00027769298,0.00012847243,0.99306154,0.0015521735,0.0027745455,0.00003501145,0.0002532759],"about_ca_topic_score_codex":0.000120148135,"about_ca_topic_score_gemma":0.0001446479,"teacher_disagreement_score":0.5156251,"about_ca_system_score_codex":0.0020652963,"about_ca_system_score_gemma":0.0006669634,"threshold_uncertainty_score":0.92574275},"labels":[],"label_agreement":null},{"id":"W2502931572","doi":"10.2172/1251315","title":"Integrating Renewable Generation into Grid Operations: Four International Experiences","year":2016,"lang":"en","type":"report","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Pacific Northwest National Laboratory; U.S. Department of Energy; European Commission; Department for Enterprise, Trade and Investment, UK Government; Argonne National Laboratory; Ministry of Economy, Trade and Industry; National Renewable Energy Laboratory; National Nuclear Security Administration; Queen's University; Commonwealth Scientific and Industrial Research Organisation; Heinrich Böll Stiftung; Department of Energy and Climate Change","keywords":"Restructuring; Resource (disambiguation); Renewable energy; Liberalization; Energy mix; Business; Electricity generation; Grid; Energy planning; Environmental economics; Electricity; Economics; Power (physics); Engineering; Geography; Market economy; Computer science; Finance","score_opus":0.028425735877644548,"score_gpt":0.26645156059268377,"score_spread":0.23802582471503922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2502931572","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005616566,0.0013028673,0.67154926,0.00012579285,0.01791356,0.00041398723,0.000016628372,0.0007355521,0.3073807],"genre_scores_gemma":[0.5935712,0.01699843,0.14550327,0.0001952626,0.03306812,0.0041155457,0.0035622632,0.00067329453,0.20231265],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99772274,0.000045184348,0.0007708456,0.00040077502,0.0007996779,0.00026074753],"domain_scores_gemma":[0.99877477,0.00004141713,0.00010675268,0.0003419337,0.0006611877,0.000073940544],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0004944216,0.00035045974,0.0003313268,0.00036151498,0.0001331384,0.00028770376,0.0003702234,0.00033823718,0.0009176748],"category_scores_gemma":[0.0004016184,0.00027702135,0.000093642855,0.00023330121,0.0000215005,0.00058721856,0.000050290317,0.00019259757,0.00007460571],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000036138683,0.000029713192,0.00011919829,0.00020118945,0.00042003609,0.000019331319,0.0036284025,0.21004698,0.011411942,0.0003169966,0.7453154,0.028487235],"study_design_scores_gemma":[0.00028204577,0.000052302967,0.000004344687,0.0005242967,0.000040019382,0.00013540816,0.00071746943,0.6722453,0.013849293,0.000038630104,0.311148,0.0009629044],"about_ca_topic_score_codex":0.0008503927,"about_ca_topic_score_gemma":0.0016899132,"teacher_disagreement_score":0.59300953,"about_ca_system_score_codex":0.0011653143,"about_ca_system_score_gemma":0.0004568721,"threshold_uncertainty_score":0.99999565},"labels":[],"label_agreement":null},{"id":"W2515536272","doi":"10.5547/01956574.38.3.tjam","title":"A Quarter Century Effort Yet to Come of Age: A Survey of Electricity Sector Reform in Developing Countries","year":2016,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":95,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Equity (law); Economics; Developing country; Poverty; Business; Economic reform; Public economics; Energy poverty; Quarter (Canadian coin); Economic policy; Economic growth; Development economics; Political science; Politics","score_opus":0.00918684849521107,"score_gpt":0.2072214291472784,"score_spread":0.19803458065206733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2515536272","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87082374,0.00052636204,0.12719607,0.00021295337,0.0004410873,0.00008826673,0.000010141725,0.000033308068,0.00066809816],"genre_scores_gemma":[0.99916345,0.00045151473,0.00026197627,0.000035881967,0.000031579457,0.0000037991992,0.0000015032736,0.000017159287,0.00003313077],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9989554,0.000095346266,0.0004417806,0.000063698826,0.00021129996,0.00023245835],"domain_scores_gemma":[0.99947876,0.00009300626,0.00011760657,0.00013797806,0.00013043646,0.000042198062],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008333766,0.00010049081,0.0002330072,0.00021449094,0.0000286083,0.0000126359955,0.00021077969,0.00005179306,0.0000140869315],"category_scores_gemma":[0.000051951087,0.0000582261,0.000030210396,0.0005115487,0.000015834976,0.00010048565,0.000016325675,0.00008735289,0.0000015490124],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0033495398,0.0005100799,0.37315762,0.0012218726,0.0029854912,0.0002773697,0.022053327,0.24650656,0.22050574,0.061586343,0.02409115,0.04375489],"study_design_scores_gemma":[0.004047305,0.0006861554,0.7560524,0.0020111098,0.000053904783,0.00052473985,0.00013454266,0.010743634,0.21398857,0.000725607,0.00989492,0.0011371251],"about_ca_topic_score_codex":0.00039747235,"about_ca_topic_score_gemma":0.0008320644,"teacher_disagreement_score":0.38289475,"about_ca_system_score_codex":0.00043842304,"about_ca_system_score_gemma":0.00008279506,"threshold_uncertainty_score":0.23743914},"labels":[],"label_agreement":null},{"id":"W2516610861","doi":"10.21511/ee.07(2).2016.1","title":"Business implications of the falling cost of electricity","year":2016,"lang":"en","type":"article","venue":"Environmental Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator","funders":"","keywords":"Electricity; Publication; Falling (accident); Cost of electricity by source; Mains electricity; Economics; Environmental economics; Electricity generation; Natural resource economics; Business; Engineering; Electrical engineering; Advertising; Power (physics); Physics","score_opus":0.004573434315301821,"score_gpt":0.15061438595762516,"score_spread":0.14604095164232334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2516610861","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95910305,0.00008959465,0.039217714,0.000068971865,0.0001008768,0.00017753166,0.00004839313,0.000017313281,0.0011765569],"genre_scores_gemma":[0.9993377,0.00036297773,0.0002111015,0.0000066218736,0.000011819316,0.000009682118,0.000002709511,0.000013808252,0.00004363587],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99961936,0.0000069060275,0.00019953694,0.000067945046,0.000022265012,0.00008397082],"domain_scores_gemma":[0.9996837,0.000029589748,0.00007467055,0.00019450735,0.000002732198,0.00001483281],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000043035656,0.000056845238,0.0000887172,0.000024702,0.000017401882,0.0000019868198,0.00012857959,0.000032240692,0.00002601439],"category_scores_gemma":[0.0000056611125,0.000041873718,0.00002938045,0.00006421841,0.0000331332,0.00006809967,0.000020731391,0.000022881663,0.00000801318],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008717038,0.0000922763,0.11800608,0.000047830494,0.000104134655,5.8016088e-8,0.0001305533,0.4037019,0.43079838,0.0018164054,0.00019991586,0.045093738],"study_design_scores_gemma":[0.00065541366,0.000021539565,0.5385839,0.00003934562,0.000032259257,0.00000852378,0.000017083714,0.02278905,0.43500215,0.00046034486,0.0021222315,0.00026818822],"about_ca_topic_score_codex":0.0000032922899,"about_ca_topic_score_gemma":0.0000035838943,"teacher_disagreement_score":0.4205778,"about_ca_system_score_codex":0.00018161513,"about_ca_system_score_gemma":0.0000075252583,"threshold_uncertainty_score":0.17075607},"labels":[],"label_agreement":null},{"id":"W2517073011","doi":"10.1146/annurev-resource-091115-022544","title":"The Economics of Wind Power","year":2016,"lang":"en","type":"article","venue":"Annual Review of Resource Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"University of Victoria","keywords":"Wind power; Electricity; Stand-alone power system; Environmental economics; Electricity retailing; Dispatchable generation; Electricity market; Electricity generation; Natural resource economics; Economics; Cost of electricity by source; Investment (military); Electricity pricing; Incentive; Business; Renewable energy; Environmental science; Distributed generation; Microeconomics; Power (physics); Engineering; Electrical engineering","score_opus":0.0033098429136225595,"score_gpt":0.1849108076288594,"score_spread":0.18160096471523685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2517073011","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36449888,0.44548765,0.0045465254,0.0032564308,0.001517109,0.0020878909,0.0005107022,0.00025959883,0.17783521],"genre_scores_gemma":[0.46557894,0.5325542,0.00039429046,0.0002619708,0.00010235761,0.000014869796,0.000007958204,0.000088235916,0.0009971957],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990242,0.000031521926,0.00062094413,0.00011418846,0.000036641213,0.00017249149],"domain_scores_gemma":[0.99902385,0.0002225748,0.00022958593,0.00041707803,0.000062882165,0.000044023534],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005465477,0.00011776409,0.00033036328,0.000040008526,0.000023812841,0.0000065313743,0.00029052017,0.000058874666,0.000028409702],"category_scores_gemma":[0.00011325837,0.00007719747,0.00011411751,0.000068904556,0.000053975407,0.000116922434,0.000033096465,0.000050212544,0.000028076138],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000087832224,0.00009485897,0.001952242,0.0098224,0.0011506219,0.0000018047889,0.001422505,0.03462744,0.0004015365,0.05354744,0.12128424,0.7756071],"study_design_scores_gemma":[0.00019816698,0.00006216814,0.0001290652,0.0013910538,0.000023451736,0.0000064771025,0.00004797444,0.00057689985,0.0009548475,0.00010758869,0.9963467,0.00015559651],"about_ca_topic_score_codex":0.000001692763,"about_ca_topic_score_gemma":0.00000249059,"teacher_disagreement_score":0.87506247,"about_ca_system_score_codex":0.00007741843,"about_ca_system_score_gemma":0.00003353002,"threshold_uncertainty_score":0.31480214},"labels":[],"label_agreement":null},{"id":"W2523886588","doi":"10.1109/tii.2016.2614659","title":"Auxiliary Hybrid PSO-BPNN-Based Transmission System Loss Estimation in Generation Scheduling","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Particle swarm optimization; Estimator; Electric power system; Scheduling (production processes); Artificial neural network; Computer science; Backpropagation; Electric power transmission; AC power; Power transmission; Transmission loss; Mathematical optimization; Real-time computing; Engineering; Power (physics); Algorithm; Artificial intelligence; Statistics; Mathematics; Telecommunications","score_opus":0.02342507939400623,"score_gpt":0.21897970247809695,"score_spread":0.19555462308409072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2523886588","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.060674023,0.000016483424,0.936365,0.000075042946,0.0014322092,0.00058529334,0.000037000227,0.00052675273,0.0002882034],"genre_scores_gemma":[0.9907827,0.00002444314,0.008880723,0.000021604732,0.00009792238,0.00009426438,0.00002273339,0.000043125227,0.000032503438],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980473,0.00007666938,0.0010457254,0.00013416515,0.0003632088,0.00033293111],"domain_scores_gemma":[0.99926513,0.0001391525,0.00013021524,0.0002765592,0.00007175351,0.000117173666],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004306068,0.00026732704,0.00027777004,0.0005726038,0.00012832257,0.00007197141,0.0001494762,0.0003036382,0.00003172255],"category_scores_gemma":[0.000014883996,0.00022859724,0.000086529515,0.0005571743,0.000024482722,0.0008040536,4.932409e-7,0.00035085954,0.00007894075],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034271536,0.000030495437,0.0000072192433,0.00009750649,0.000019684026,0.0000024918024,0.00015131566,0.919955,0.0010722675,0.000020434489,0.00011856883,0.07849072],"study_design_scores_gemma":[0.0019760886,0.00007126546,0.0000018521109,0.00055910985,0.000027996752,0.000014050964,0.00004450201,0.88526356,0.111657076,0.0000034486145,0.00013422132,0.00024683296],"about_ca_topic_score_codex":0.0000151500535,"about_ca_topic_score_gemma":0.0000061983,"teacher_disagreement_score":0.93010867,"about_ca_system_score_codex":0.00081762153,"about_ca_system_score_gemma":0.00013922194,"threshold_uncertainty_score":0.9321925},"labels":[],"label_agreement":null},{"id":"W2524178484","doi":"","title":"Analisis comparativo de diferentes esquemas de suficiencia en generacion electrica: Algunas reflexiones para el mercado electrico en Colombia","year":2016,"lang":"es","type":"preprint","venue":"El Repositorio Institucional de la Universidad EAFIT (Universidad EAFIT)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Philosophy","score_opus":0.007783343600616901,"score_gpt":0.26341787422291457,"score_spread":0.2556345306222977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2524178484","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7063801,0.0029051553,0.22343142,0.0012218214,0.0026159654,0.0019428452,0.00026855894,0.0014402901,0.059793826],"genre_scores_gemma":[0.9839036,0.004878452,0.0063563986,0.000095750576,0.0018081499,0.00006552479,0.00035083856,0.0002992231,0.002242046],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9888451,0.0027235285,0.0015010495,0.0023638476,0.0018172988,0.0027491478],"domain_scores_gemma":[0.9926315,0.002189911,0.0012936604,0.001674584,0.00097382226,0.0012365049],"candidate_categories":["metaepi_narrow","sts","research_integrity"],"consensus_categories":["metaepi_narrow","research_integrity"],"category_scores_codex":[0.0018975515,0.002036377,0.0020872583,0.0029034487,0.0014760845,0.0007530034,0.002711022,0.0029996498,0.00016373707],"category_scores_gemma":[0.0005684967,0.0023720334,0.0010295964,0.0033178078,0.00039644336,0.0015712527,0.0008221578,0.003004206,0.00016392094],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0034898308,0.0015962655,0.04406194,0.0015730857,0.0063085924,0.0050375704,0.01277656,0.29646736,0.22749165,0.38138717,0.015926817,0.0038831518],"study_design_scores_gemma":[0.016925015,0.004051826,0.19639166,0.008254089,0.007871702,0.0067640804,0.005263396,0.44845432,0.113841474,0.008603799,0.16762774,0.015950909],"about_ca_topic_score_codex":0.0020438617,"about_ca_topic_score_gemma":0.00014841299,"teacher_disagreement_score":0.37278336,"about_ca_system_score_codex":0.01884162,"about_ca_system_score_gemma":0.003970966,"threshold_uncertainty_score":0.99982387},"labels":[],"label_agreement":null},{"id":"W2527920400","doi":"10.3138/9781442690127-010","title":"8. What Is the ‘Right’ Price for Electricity in Ontario?","year":2010,"lang":"en","type":"book-chapter","venue":"University of Toronto Press eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity price; Business; Economics; Engineering; Electrical engineering","score_opus":0.008988308858388819,"score_gpt":0.1700185440072686,"score_spread":0.16103023514887976,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2527920400","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000048997572,0.0024314714,0.006321716,0.000011592643,0.00058553036,0.0010655907,0.000021743039,0.00009424919,0.9894191],"genre_scores_gemma":[0.001369336,0.00076247443,0.001029101,0.00001956683,0.000044423705,0.000002168935,0.000017727814,0.000052829666,0.9967024],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99915254,0.000011554565,0.00018862743,0.00023518616,0.00018186866,0.00023020754],"domain_scores_gemma":[0.9992053,0.00009649103,0.00014067338,0.00040444228,0.000103986764,0.000049135553],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012874031,0.00023843428,0.00033401276,0.000039813072,0.00007563762,0.0000317249,0.00047492486,0.00043772007,0.00021359877],"category_scores_gemma":[0.0000030383255,0.000245462,0.0001418441,0.0000017984712,0.000048074424,0.000233044,0.00005544237,0.00039663477,0.0000020300524],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016858809,0.00024969346,0.000102571394,0.0040583108,0.005349509,0.00019038485,0.20822972,0.009062431,0.0050760796,0.6227513,0.08303575,0.06020835],"study_design_scores_gemma":[0.00041585948,0.00004490425,0.000023753639,0.00015540085,0.00009428835,0.0000023588195,0.000012204816,0.0020103748,0.00091350405,0.00037314888,0.99567217,0.00028201615],"about_ca_topic_score_codex":0.18166079,"about_ca_topic_score_gemma":0.6938972,"teacher_disagreement_score":0.91263646,"about_ca_system_score_codex":0.00089450646,"about_ca_system_score_gemma":0.00010134504,"threshold_uncertainty_score":0.99999976},"labels":[],"label_agreement":null},{"id":"W2532155703","doi":"10.1109/ipec.2005.207046","title":"Reliability component in transmission service pricing","year":2005,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wheeling; Component (thermodynamics); Reliability (semiconductor); Reliability engineering; Transmission system; Computer science; Transmission (telecommunications); Incentive; Service (business); Investment (military); Engineering; Telecommunications; Business; Economics; Power (physics); Microeconomics","score_opus":0.005206745081986079,"score_gpt":0.19324173349792592,"score_spread":0.18803498841593985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2532155703","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45662403,0.00023134169,0.5119081,0.00063217164,0.00010010079,0.00029660785,3.1728686e-7,0.0006045793,0.029602738],"genre_scores_gemma":[0.9870067,0.0000200417,0.012788,0.00006773689,0.00001897085,0.000006120446,0.0000027219967,0.000012245847,0.00007746376],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994745,0.000017757948,0.00019395507,0.00009421763,0.0000840858,0.00013544233],"domain_scores_gemma":[0.9998001,0.000022863906,0.0000081135095,0.00011656218,0.00001825222,0.00003411989],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014823348,0.000067682406,0.000086825,0.0000616815,0.000011862132,0.000007692451,0.000061013267,0.000044281413,0.00006697162],"category_scores_gemma":[0.0000037439781,0.00006310975,0.00001276832,0.00030404542,0.0000015615999,0.00012223722,0.000004472594,0.000076610224,0.000039668874],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000024983551,0.00002066612,0.00040730892,0.000063322645,0.0000014858159,4.600067e-7,0.00034828563,0.98297316,0.007901696,0.000030082401,0.00021536807,0.008035652],"study_design_scores_gemma":[0.00020192453,0.000004545872,0.004316345,0.00002982579,0.0000015239323,0.000001911724,0.000008977816,0.98370457,0.0064061754,0.000008683236,0.005232024,0.000083505125],"about_ca_topic_score_codex":0.000061668965,"about_ca_topic_score_gemma":0.00007195458,"teacher_disagreement_score":0.5303827,"about_ca_system_score_codex":0.00016177674,"about_ca_system_score_gemma":0.0000061649516,"threshold_uncertainty_score":0.2573541},"labels":[],"label_agreement":null},{"id":"W2537516281","doi":"10.1287/inte.2016.0863","title":"Power System Operator in Mexico Reveals Millions in Savings by Updating Its Short-Term Thermal Unit Commitment Model","year":2016,"lang":"en","type":"article","venue":"INFORMS Journal on Applied Analytics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Alberta","keywords":"Power system simulation; Integer programming; Operations research; Operator (biology); Lagrangian relaxation; Computer science; Thermal power station; Operational planning; Process (computing); Mathematical optimization; Term (time); Economic dispatch; Electric power system; Engineering; Power (physics); Economics; Mathematics; Operating system; Waste management","score_opus":0.012622626418105801,"score_gpt":0.22828881889855795,"score_spread":0.21566619248045216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2537516281","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8955849,0.00018997658,0.067002796,0.00016205333,0.0002677495,0.0007220382,0.00005039578,0.0002003217,0.035819806],"genre_scores_gemma":[0.99905026,0.00010214411,0.00048810855,0.000110142944,0.000034013407,0.000025832605,0.00000806553,0.000055255114,0.00012617992],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978135,0.00002271928,0.0010813575,0.0001585726,0.00041275876,0.000511096],"domain_scores_gemma":[0.9992582,0.00007204805,0.00015649686,0.00024983042,0.000080233156,0.00018315195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006973302,0.0002896843,0.0004125063,0.00052118173,0.00007906221,0.000119569515,0.00032545766,0.00017310263,0.000026493233],"category_scores_gemma":[0.000026179347,0.00020359413,0.0000659011,0.0005529442,0.00001442649,0.00035959622,0.00003769683,0.0004564526,0.000053498454],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003656806,0.000067109875,0.0066380063,0.000080157144,0.000101423764,0.00003410312,0.0005890986,0.96768224,0.016623907,0.0055979528,0.0011463622,0.0014030915],"study_design_scores_gemma":[0.0025898574,0.000121882,0.0014815719,0.0015823453,0.00003812685,0.000084783955,0.00050305686,0.9838378,0.008382195,0.00007387423,0.00040947535,0.0008950512],"about_ca_topic_score_codex":9.563408e-7,"about_ca_topic_score_gemma":0.0000059087843,"teacher_disagreement_score":0.10346539,"about_ca_system_score_codex":0.0010145965,"about_ca_system_score_gemma":0.00006402686,"threshold_uncertainty_score":0.8302328},"labels":[],"label_agreement":null},{"id":"W2540358859","doi":"10.1109/icpst.2008.4745162","title":"Pros and Cons of Existing Frequency Regulation Mechanism in Indian Power Industry","year":2008,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canada Excellence Research Chairs, Government of Canada","keywords":"Reliability (semiconductor); Supply and demand; Mechanism (biology); cons; Electric power system; Automatic frequency control; Electricity; Electric power industry; Frequency regulation; Mains electricity; Computer science; Power (physics); Business; Industrial organization; Risk analysis (engineering); Reliability engineering; Telecommunications; Engineering; Economics; Electrical engineering; Microeconomics","score_opus":0.018237858400203696,"score_gpt":0.21424539958991737,"score_spread":0.19600754118971367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2540358859","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9521708,0.00007556633,0.015387276,0.000015565622,0.00007112564,0.00021439462,0.0000014279442,0.00011092704,0.03195294],"genre_scores_gemma":[0.99497795,0.000007109161,0.004815238,0.000005371017,0.0000070227884,0.000007728185,0.0000027617941,0.000012312613,0.00016452934],"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99952346,0.0000138052055,0.00020063676,0.0000800775,0.00007516936,0.00010682374],"domain_scores_gemma":[0.9998176,0.000018819683,0.000031857082,0.0000808716,0.000023854382,0.00002696329],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000086002365,0.00006418011,0.00009802199,0.00013699279,0.000018609118,0.000004176253,0.000030651958,0.00015348457,0.00004002397],"category_scores_gemma":[0.000033740595,0.00006841532,0.000007363676,0.0002422183,0.000012842138,0.00011253497,0.000006515309,0.00012393457,0.0000015936918],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019578061,0.00019038704,0.43020707,0.0009153181,0.0001548634,0.00018441676,0.028123287,0.04935131,0.24913935,0.23727372,0.0012640664,0.0031766177],"study_design_scores_gemma":[0.0044624433,0.00040356518,0.3146983,0.00095370074,0.00003437892,0.0009350369,0.001398898,0.32714355,0.33035454,0.017610619,0.00012049847,0.0018844472],"about_ca_topic_score_codex":0.000049465445,"about_ca_topic_score_gemma":0.000023053395,"teacher_disagreement_score":0.27779225,"about_ca_system_score_codex":0.000042577947,"about_ca_system_score_gemma":0.000019319177,"threshold_uncertainty_score":0.27898958},"labels":[],"label_agreement":null},{"id":"W2540360429","doi":"10.1109/sae.2009.5534850","title":"On gaming in electricity markets under cap-and-trade","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Electricity; Electricity market; Industrial organization; Business; Microeconomics; Economics; Environmental economics; Engineering; Electrical engineering","score_opus":0.003852852135180528,"score_gpt":0.18769062988110966,"score_spread":0.18383777774592913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2540360429","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5968342,0.0011098748,0.23377323,0.0006387132,0.00019473457,0.0003985277,5.102521e-7,0.0008068609,0.16624337],"genre_scores_gemma":[0.99903494,0.000054189248,0.00048645845,0.0002443533,0.000012800942,0.0000025154147,0.0000012279172,0.000010793427,0.00015270944],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945235,0.000020351057,0.00013364252,0.000110337154,0.00008583961,0.00019746294],"domain_scores_gemma":[0.99980956,0.000054846965,0.000009861879,0.000088145134,0.0000036635533,0.000033905755],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010897293,0.00009014097,0.0001010802,0.00015625145,0.000014349442,0.000016627206,0.000044346616,0.000059633287,0.000019452236],"category_scores_gemma":[0.000017831766,0.00008912301,0.000012617176,0.0003195841,0.000002444208,0.000069373295,0.0000023684158,0.00011008875,0.000006786441],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000085990374,0.00026075964,0.0038532177,0.00013466261,0.00008805252,0.00006667351,0.0009417992,0.7870174,0.023801621,0.07154514,0.019596005,0.09260867],"study_design_scores_gemma":[0.0007580855,0.00011901102,0.11328101,0.000059205842,0.00000874197,0.000025857435,0.00001868262,0.87198246,0.010755779,0.0023283088,0.00024943738,0.0004134271],"about_ca_topic_score_codex":0.000009677978,"about_ca_topic_score_gemma":0.000013600948,"teacher_disagreement_score":0.40220076,"about_ca_system_score_codex":0.000106863896,"about_ca_system_score_gemma":0.0000055186524,"threshold_uncertainty_score":0.3634331},"labels":[],"label_agreement":null},{"id":"W2540882355","doi":"10.1109/sae.2009.5534871","title":"Effects of wind power on day-ahead reserve schedule","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Power system simulation; Schedule; Electric power system; Penetration (warfare); Reserve requirement; Computer science; Wind speed; Benchmark (surveying); Environmental science; Simulation; Power (physics); Meteorology; Operations research; Economics; Engineering; Electrical engineering; Monetary economics; Geography; Central bank; Physics","score_opus":0.0034778068442386026,"score_gpt":0.19636894083131037,"score_spread":0.19289113398707178,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2540882355","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6585845,0.00090735336,0.06217123,0.00016934698,0.00063961366,0.000648353,0.0000016020751,0.0007216184,0.27615643],"genre_scores_gemma":[0.9982489,0.00000794284,0.0010949365,0.000048974285,0.000021308657,0.0000018624715,0.0000020433076,0.000015240859,0.0005588291],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994039,0.000025517276,0.00015703985,0.0001011833,0.00014716161,0.00016520258],"domain_scores_gemma":[0.9996378,0.00007648572,0.000020219297,0.00019484476,0.000029042223,0.000041650386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010996018,0.00009638295,0.0001374477,0.0001025458,0.000013077831,0.0000097239335,0.0000969417,0.00007125211,0.00004283378],"category_scores_gemma":[0.00006115086,0.00008868292,0.000032720556,0.00025669305,0.0000048366574,0.00008485019,0.000005012669,0.00008030179,0.00005447753],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009916649,0.000713094,0.0012358039,0.0007901414,0.00028459288,0.000068428046,0.0012884799,0.50040454,0.38344663,0.037418135,0.06358133,0.0106696375],"study_design_scores_gemma":[0.0013311235,0.00093577773,0.015376797,0.00026322217,0.000023415028,0.0000051132147,0.000013139786,0.08076758,0.89911944,0.00031232118,0.00143288,0.00041922252],"about_ca_topic_score_codex":0.000003947817,"about_ca_topic_score_gemma":0.0000015002115,"teacher_disagreement_score":0.5156728,"about_ca_system_score_codex":0.000043743006,"about_ca_system_score_gemma":0.0000072565235,"threshold_uncertainty_score":0.36163846},"labels":[],"label_agreement":null},{"id":"W2542023874","doi":"10.1109/tdc-la.2010.5762873","title":"The impact of wind power variability and curtailment on ramping requirements","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Residual; Reliability engineering; Base load power plant; Grid; Computer science; Load management; Electric power system; Power grid; Service (business); Power demand; Automotive engineering; Peak demand; Demand response; Power (physics); Engineering; Electricity; Electrical engineering; Power consumption; Business","score_opus":0.006302993472803593,"score_gpt":0.2457508884602599,"score_spread":0.2394478949874563,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2542023874","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96031636,0.000018391043,0.0064515895,0.00002160996,0.00030104892,0.00022278611,0.0000013799573,0.000066185654,0.032600623],"genre_scores_gemma":[0.9995998,0.000008041735,0.00031013353,0.0000034294383,0.000011369304,0.0000027242284,7.9580184e-7,0.000009472449,0.000054210224],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99950254,0.000021243879,0.00016256752,0.00008319151,0.00009978285,0.00013067941],"domain_scores_gemma":[0.9995738,0.000105178035,0.000027001117,0.00022985862,0.000029055705,0.000035058554],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004390603,0.00007524359,0.0000798327,0.00002545784,0.000039096612,0.00002322823,0.00006767917,0.00004160387,0.000059905677],"category_scores_gemma":[0.00007943479,0.00004676788,0.000026477184,0.00008548258,0.000017246528,0.00006421695,0.000012751736,0.000095721436,0.0000034453994],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002574866,0.00051347364,0.2096104,0.00026211742,0.0013087963,0.0000037092002,0.0030843746,0.29901665,0.4119651,0.03394156,0.0105239665,0.029512372],"study_design_scores_gemma":[0.0022461917,0.0012419352,0.2920644,0.000118873475,0.00004961947,0.000017831931,0.00009972889,0.6590429,0.040487714,0.0018731698,0.0018875818,0.0008700783],"about_ca_topic_score_codex":0.000021904165,"about_ca_topic_score_gemma":0.0000039997667,"teacher_disagreement_score":0.37147737,"about_ca_system_score_codex":0.000048617578,"about_ca_system_score_gemma":0.000012337846,"threshold_uncertainty_score":0.19071388},"labels":[],"label_agreement":null},{"id":"W2545155455","doi":"10.1109/epc.2007.4520372","title":"A Comprehensive Short-Term Operations Framework for a Disco in Competitive Electricity Markets","year":2007,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Scheduling (production processes); Operations research; Grid; Electricity; Computer science; Term (time); Operations management; Engineering","score_opus":0.012563631358904058,"score_gpt":0.26458801005218846,"score_spread":0.2520243786932844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2545155455","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08000772,0.00018074017,0.9105086,0.000031078696,0.00018497443,0.0007543784,0.000008075241,0.00020953505,0.008114937],"genre_scores_gemma":[0.9555501,0.000030870564,0.044077728,0.000059046346,0.00005857602,0.000077807774,0.0000315263,0.000030561543,0.00008379401],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99903214,0.00002331911,0.00030602547,0.00017536445,0.00010649205,0.0003566826],"domain_scores_gemma":[0.9993175,0.00037669737,0.00001096753,0.00014829112,0.00008643099,0.00006011108],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017068484,0.00014630664,0.00019687622,0.00020583917,0.000051812473,0.000038519953,0.00010220048,0.00011449159,0.00003330172],"category_scores_gemma":[0.000056950157,0.00014935649,0.000044356097,0.00053493556,0.000012807322,0.00013327455,0.000012173429,0.00016857259,0.0000072010794],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046007198,0.0007029568,0.03911342,0.00079415983,0.0005535528,0.000100015786,0.004906623,0.37980002,0.02787963,0.5196291,0.0029733994,0.023087043],"study_design_scores_gemma":[0.0010571859,0.0001668386,0.08618947,0.00021777458,0.00003208066,0.00003007232,0.00041909196,0.8916713,0.016878635,0.0010031133,0.001501233,0.0008332067],"about_ca_topic_score_codex":0.000013165546,"about_ca_topic_score_gemma":0.00036583332,"teacher_disagreement_score":0.8755424,"about_ca_system_score_codex":0.00019645397,"about_ca_system_score_gemma":0.000019260619,"threshold_uncertainty_score":0.60905814},"labels":[],"label_agreement":null},{"id":"W2545357316","doi":"10.1109/nssmic.2004.1466909","title":"Electric utility deregulation: failure or success","year":2005,"lang":"en","type":"article","venue":"IEEE Symposium Conference Record Nuclear Science 2004.","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Deregulation; Restructuring; Revenue; Electric power industry; Electric utility; Electricity market; Blackout; Commission; Business; Electric power; Order (exchange); Electricity; Economics; Industrial organization; Market economy; Finance; Electric power system; Power (physics); Engineering","score_opus":0.011698687575825055,"score_gpt":0.22390245553913982,"score_spread":0.21220376796331475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2545357316","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88180894,0.00010784423,0.07057208,0.0015743282,0.0024068167,0.0009901889,0.000009594212,0.0021282656,0.040401958],"genre_scores_gemma":[0.99133295,0.0000960522,0.007707415,0.00007508161,0.00022437007,0.000016489128,0.0000016763444,0.00004949575,0.0004964536],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99744016,0.000051951265,0.00047851776,0.0005804521,0.0006284804,0.00082042685],"domain_scores_gemma":[0.9986393,0.00004932717,0.00010548498,0.0005970868,0.00033291208,0.0002759068],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005230418,0.000302831,0.00029625688,0.00042797535,0.00034576043,0.00042748463,0.0009128326,0.00016132742,0.0007646862],"category_scores_gemma":[0.00005200427,0.00028174615,0.000062685285,0.0024350022,0.00018158816,0.0016016803,0.000037373313,0.00027965978,0.00042071036],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001656742,0.0002728225,0.004135388,0.00027650583,0.000088149536,0.000027864871,0.002122618,0.1371305,0.5422902,0.0025362624,0.025101833,0.2858522],"study_design_scores_gemma":[0.00027346142,0.00009435067,0.0009450351,0.000045403656,0.000014871696,0.000055243687,0.00003120468,0.9705747,0.010516723,0.000033067052,0.016981468,0.00043449167],"about_ca_topic_score_codex":0.000041613326,"about_ca_topic_score_gemma":0.00020594985,"teacher_disagreement_score":0.8334442,"about_ca_system_score_codex":0.00045326294,"about_ca_system_score_gemma":0.0003879538,"threshold_uncertainty_score":0.99996346},"labels":[],"label_agreement":null},{"id":"W2547848394","doi":"10.1109/asscc.2012.6523255","title":"Triangular approximate distribution model of wind electric generators","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Unavailability; Wind power; Renewable energy; Cumulative distribution function; Electric power system; Probability density function; Electricity; Electricity generation; Computer science; Probability distribution; Power (physics); Wind speed; Stochastic modelling; Mathematical optimization; Reliability engineering; Engineering; Meteorology; Electrical engineering; Mathematics; Statistics; Physics","score_opus":0.008962909200484724,"score_gpt":0.187485015080024,"score_spread":0.17852210587953926,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2547848394","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16378334,0.00073721784,0.8320488,0.000003471597,0.00013271632,0.00014851299,0.000008721976,0.00019543356,0.0029417821],"genre_scores_gemma":[0.99606836,0.00003258038,0.003654875,0.0000043409223,0.0000569802,0.000007457279,0.000046494923,0.000021895747,0.00010702786],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926245,0.000017691176,0.00025148186,0.000069874375,0.00012694925,0.00027152774],"domain_scores_gemma":[0.9997032,0.000010448046,0.00003821651,0.00014877882,0.00003527076,0.000064060936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020785513,0.00010035119,0.00014169174,0.00007213279,0.000019586505,0.000007699256,0.0000664938,0.00007648596,0.000015314085],"category_scores_gemma":[0.000019430083,0.000095672964,0.00003846616,0.00041379058,0.0000043859272,0.00019124211,0.000006852745,0.000055117544,0.0000101812775],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000061709916,0.00005337959,0.0009066218,0.00008644283,0.000055801323,1.5345834e-7,0.00014143638,0.8971161,0.08917969,0.008211809,0.0027174214,0.0015249773],"study_design_scores_gemma":[0.00015227949,0.000008318438,0.000055305172,0.0000030105155,0.000014566036,0.000001821032,0.000003196714,0.82380927,0.17574494,0.000035639947,0.000079129946,0.00009253783],"about_ca_topic_score_codex":0.000003059623,"about_ca_topic_score_gemma":2.5157706e-7,"teacher_disagreement_score":0.832285,"about_ca_system_score_codex":0.00009668851,"about_ca_system_score_gemma":0.000012917667,"threshold_uncertainty_score":0.39014304},"labels":[],"label_agreement":null},{"id":"W2548383892","doi":"","title":"Solar Power Generation and Risk Transfer Systems","year":2015,"lang":"en","type":"article","venue":"International Journal of Business","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity generation; Renewable energy; Tariff; Grid parity; Electricity; Solar power; Electric power system; Feed-in tariff; Environmental economics; Stand-alone power system; Distributed generation; Environmental science; Economics; Power (physics); Energy policy; Engineering; Electrical engineering; International economics; Physics","score_opus":0.013391551092007806,"score_gpt":0.20488265235149342,"score_spread":0.1914911012594856,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2548383892","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39863044,0.0018233289,0.5943718,0.00008191104,0.0045613656,0.000052543437,0.000007339635,0.000026916816,0.0004443708],"genre_scores_gemma":[0.9985274,0.00042862893,0.00046023898,0.000010117609,0.00052121194,0.0000014600754,0.000005396421,0.000016947026,0.000028569355],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99915373,0.000033861143,0.00032402933,0.00005447955,0.00035997154,0.00007394668],"domain_scores_gemma":[0.9987017,0.000017484914,0.00007112949,0.000049989947,0.0010947187,0.000064999884],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033276598,0.00007959982,0.00012472646,0.00018912111,0.000013763322,0.00010812494,0.0001293299,0.000050042418,0.0000054199963],"category_scores_gemma":[0.00007667958,0.0000713029,0.000023172866,0.00012429105,0.000009513908,0.0004231193,0.0000068025274,0.00009705412,0.000004519955],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045187702,0.00003387727,0.0046121986,0.000016032855,0.00035172285,0.00006196197,0.0007215754,0.98269343,0.0041705677,0.0004542896,0.004026247,0.002812907],"study_design_scores_gemma":[0.00466554,0.00018021297,0.017623302,0.0002785637,0.00017164006,0.003394873,0.00026547167,0.9364478,0.0054700947,0.0001456918,0.030746864,0.000609936],"about_ca_topic_score_codex":0.000019881143,"about_ca_topic_score_gemma":0.0000031891573,"teacher_disagreement_score":0.599897,"about_ca_system_score_codex":0.000111090936,"about_ca_system_score_gemma":0.000045121855,"threshold_uncertainty_score":0.2907648},"labels":[],"label_agreement":null},{"id":"W2548767124","doi":"","title":"Impact of solar production on Czech electricity grid system imbalance","year":2016,"lang":"en","type":"preprint","venue":"LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Grantová Agentura České Republiky; European Commission; McGill University","keywords":"Photovoltaics; Czech; Electricity; Volatility (finance); Photovoltaic system; Electricity generation; Stand-alone power system; Economics; Grid parity; Grid; Production (economics); Natural resource economics; Business; Econometrics; Macroeconomics; Engineering; Power (physics); Geography; Electrical engineering; Physics","score_opus":0.013408411472989448,"score_gpt":0.23323160058608566,"score_spread":0.21982318911309623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2548767124","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5250002,0.0042261677,0.23050654,0.0032059902,0.025032276,0.008145731,0.0012405865,0.007434332,0.19520815],"genre_scores_gemma":[0.9964619,0.00026441464,0.0008859888,0.0000067356104,0.0014213013,0.00048623432,0.00023792533,0.00014868373,0.00008676409],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9954429,0.00042234745,0.0012193732,0.0010311016,0.0010082294,0.0008759936],"domain_scores_gemma":[0.9967179,0.00016446353,0.0007548093,0.0012392867,0.000781639,0.00034194253],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007880775,0.00083665096,0.0010168545,0.0009502084,0.00030018287,0.00017757076,0.00082746206,0.001135766,0.0000094791],"category_scores_gemma":[0.00047774424,0.00073553657,0.0005165918,0.00087933615,0.000019805078,0.00031867577,0.00021492498,0.00122731,0.000015771582],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015470956,0.0020967806,0.006187957,0.008227988,0.004652903,0.00033934394,0.0021872772,0.28492895,0.09656897,0.5703398,0.01628665,0.006636308],"study_design_scores_gemma":[0.009607047,0.0023272794,0.07340684,0.020106938,0.0017795532,0.008699071,0.00027502686,0.18523847,0.22024539,0.0019168508,0.46482065,0.011576874],"about_ca_topic_score_codex":0.000001989159,"about_ca_topic_score_gemma":0.000018411365,"teacher_disagreement_score":0.5684229,"about_ca_system_score_codex":0.00428505,"about_ca_system_score_gemma":0.00080791116,"threshold_uncertainty_score":0.99953735},"labels":[],"label_agreement":null},{"id":"W2551089671","doi":"","title":"Short-term unit commitment and loading problem","year":2014,"lang":"fr","type":"article","venue":"Constellation (Université du Québec à Chicoutimi)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Fonds de recherche du Québec – Nature et technologies; Natural Sciences and Engineering Research Council of Canada","keywords":"Time horizon; Mathematical optimization; Power system simulation; Term (time); Integer programming; Integer (computer science); Power (physics); Linear programming; Hydropower; Power station; Mathematics; Computer science; Control theory (sociology); Engineering; Electric power system","score_opus":0.009096676134648743,"score_gpt":0.1793492412427916,"score_spread":0.17025256510814288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2551089671","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17067625,0.012390035,0.35276693,0.005604187,0.0019673042,0.001485122,0.000032316766,0.0008368169,0.45424104],"genre_scores_gemma":[0.9937573,0.0005327256,0.002028201,0.000052916297,0.00017460136,0.0000018117479,0.000038867205,0.00006222171,0.003351332],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983625,0.00018407841,0.00037871877,0.00040501115,0.0002369903,0.00043271543],"domain_scores_gemma":[0.99883777,0.000297263,0.00013189296,0.00034139334,0.00013865603,0.00025304974],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0002967608,0.00036405463,0.00037999707,0.00030313383,0.000370077,0.00012692786,0.0001977076,0.00027598528,0.0031410835],"category_scores_gemma":[0.00002079932,0.0004755456,0.00008512803,0.00043859248,0.00018966562,0.00047832326,0.00010672841,0.00028973367,0.00007996745],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000075168755,0.00020674073,0.29979464,0.0016124087,0.0008816871,0.000054999575,0.0122778965,0.26257727,0.0016408291,0.04669895,0.04491453,0.32926488],"study_design_scores_gemma":[0.0019044062,0.00019300262,0.046058536,0.000709082,0.0005285814,0.00025584374,0.00064335513,0.8511615,0.00043248455,0.00016007868,0.09680792,0.0011452466],"about_ca_topic_score_codex":0.0012167095,"about_ca_topic_score_gemma":0.0015333861,"teacher_disagreement_score":0.8230811,"about_ca_system_score_codex":0.0006750857,"about_ca_system_score_gemma":0.00016374039,"threshold_uncertainty_score":0.9997696},"labels":[],"label_agreement":null},{"id":"W2553557427","doi":"10.1049/cp.2016.0476","title":"Economic viability of price arbitrage operation of vanadium redox battey in Alberta's energy market","year":2016,"lang":"en","type":"article","venue":"12th IET International Conference on AC and DC Power Transmission (ACDC 2016)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Vanadium; Arbitrage; Redox; Energy (signal processing); Business; Economics; Materials science; Finance; Metallurgy; Mathematics","score_opus":0.006065989505328032,"score_gpt":0.21219052636276767,"score_spread":0.20612453685743964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2553557427","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2577352,0.0003652416,0.3930101,0.0036014959,0.0018858685,0.0007374277,0.0002605995,0.00013644536,0.3422676],"genre_scores_gemma":[0.9972213,0.00062235526,0.00036603058,0.000035292673,0.00001925714,0.000016370219,0.000017186943,0.000019536345,0.0016826611],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987115,0.00006634707,0.00056846195,0.00027747898,0.0001947202,0.00018148388],"domain_scores_gemma":[0.99932384,0.00016955915,0.000111572976,0.0001995416,0.000094859344,0.00010062148],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00027776757,0.0001857504,0.0002696609,0.00022742848,0.000018564418,0.00001924528,0.00022269381,0.00013424385,0.0027129585],"category_scores_gemma":[0.000034866276,0.0001442003,0.00005527057,0.0000713246,0.000049064813,0.0002826274,0.000015174305,0.00009749404,0.000009071255],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0028949415,0.0012486614,0.024879951,0.000886171,0.0007340431,0.000019484687,0.0035285202,0.015010802,0.623703,0.22076055,0.024165707,0.08216813],"study_design_scores_gemma":[0.010372401,0.0013154664,0.06936398,0.0042017573,0.00006957999,0.000041006635,0.00020071607,0.42510065,0.40943557,0.00888877,0.06878022,0.0022298568],"about_ca_topic_score_codex":0.00045357403,"about_ca_topic_score_gemma":0.00019416728,"teacher_disagreement_score":0.7394861,"about_ca_system_score_codex":0.00012716085,"about_ca_system_score_gemma":0.00012140525,"threshold_uncertainty_score":0.9981987},"labels":[],"label_agreement":null},{"id":"W2556166935","doi":"10.1109/naps.2016.7747984","title":"Security constrained transmission expansion planning by accelerated benders decomposition","year":2016,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Precondition; Decomposition; Computer science; Benders' decomposition; Mathematical optimization; Reduction (mathematics); Acceleration; Transmission (telecommunications); Stochastic programming; Mathematics; Telecommunications","score_opus":0.009437011524755458,"score_gpt":0.23550878184199942,"score_spread":0.22607177031724396,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2556166935","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.093627304,0.00024765704,0.8958912,0.00014844132,0.00014402975,0.00018410345,0.000007682212,0.0008567171,0.008892887],"genre_scores_gemma":[0.99868876,0.00005190069,0.0010262377,0.000027105234,0.000017851,0.000009961991,0.00004297828,0.00002630707,0.00010891054],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99923325,0.000032153413,0.00021935569,0.00016025215,0.00013263336,0.00022235286],"domain_scores_gemma":[0.9996989,0.00005168367,0.000023722094,0.00010272369,0.00003336149,0.000089648245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000088231835,0.00013863998,0.00012488705,0.000080463,0.000055142853,0.00002530695,0.00007199105,0.000112411326,0.00024309527],"category_scores_gemma":[0.000005340455,0.00010186714,0.000029637144,0.00017143691,0.000014606189,0.00027041763,0.0000044549292,0.000062032974,0.000019930583],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025736965,0.00002978152,0.00017531238,0.000043836164,0.000037668793,0.000005321973,0.00034992187,0.008408578,0.94975734,0.000123559,0.021607444,0.01943548],"study_design_scores_gemma":[0.0020768119,0.000109691406,0.00014552695,0.00032878903,0.000021917174,0.000032501517,0.00009379217,0.34084752,0.65269667,0.00022370195,0.0028703152,0.0005527818],"about_ca_topic_score_codex":0.0000059058525,"about_ca_topic_score_gemma":7.222071e-7,"teacher_disagreement_score":0.9050614,"about_ca_system_score_codex":0.00009696063,"about_ca_system_score_gemma":0.0000135203345,"threshold_uncertainty_score":0.41540214},"labels":[],"label_agreement":null},{"id":"W2557243083","doi":"","title":"Québec's Cost-Effective Electrical Efficiency Potential: Results of a Utility-Stakeholders Working Group Process","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Stakeholder; Transparency (behavior); Openness to experience; Process (computing); Business; Portfolio; Environmental economics; Public economics; Economics; Political science; Public relations; Finance; Computer science; Psychology","score_opus":0.012698644580522837,"score_gpt":0.21564503614212024,"score_spread":0.2029463915615974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2557243083","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0871933,0.0010185381,0.8541612,0.000043099077,0.00029570764,0.0023788551,0.000006753945,0.001016558,0.05388598],"genre_scores_gemma":[0.99906844,0.00000790381,0.00053610554,0.0000074986483,0.00005442228,0.00012914278,0.000019646626,0.000038516548,0.00013830166],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984063,0.00006302626,0.00051690126,0.0002952048,0.000310011,0.00040859007],"domain_scores_gemma":[0.99937963,0.00014176796,0.00009549434,0.00023001836,0.0000984272,0.000054659875],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032780934,0.000199403,0.0002700931,0.00021859423,0.000056956826,0.000030285648,0.00018201325,0.00012167178,0.000012840253],"category_scores_gemma":[0.00008494312,0.00019215728,0.00007721067,0.0011375757,0.000033914806,0.00012192712,0.000012566485,0.00018079086,0.000007494733],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031274642,0.00055317045,0.0037120117,0.00033371977,0.00013208792,0.000027499522,0.0007170792,0.92024165,0.008105683,0.0008562785,0.0051117693,0.059896283],"study_design_scores_gemma":[0.0015736324,0.00015691055,0.004028918,0.00007561563,0.000044060143,0.000019115074,0.000052830575,0.9762928,0.015949022,0.00007741264,0.0013599389,0.0003697287],"about_ca_topic_score_codex":0.0020915617,"about_ca_topic_score_gemma":0.0011528088,"teacher_disagreement_score":0.9118752,"about_ca_system_score_codex":0.0001987081,"about_ca_system_score_gemma":0.000053317697,"threshold_uncertainty_score":0.78359467},"labels":[],"label_agreement":null},{"id":"W2559760681","doi":"10.1109/epec.2016.7771711","title":"Estimated economic load dispatch based on real operation logbook","year":2016,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Logbook; Computer science; Economic dispatch; Electric power system; Task (project management); Constraint (computer-aided design); Software; Power (physics); Energy management; Constrained optimization problem; Energy management system; Mathematical optimization; Reliability engineering; Optimization problem; Energy (signal processing); Engineering; Algorithm","score_opus":0.007299896394019185,"score_gpt":0.20637091212929967,"score_spread":0.1990710157352805,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2559760681","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037043046,0.000016537213,0.8468675,0.00025881542,0.00048575702,0.000288904,0.000008468309,0.0010743478,0.11395663],"genre_scores_gemma":[0.9968649,0.000022156057,0.0017924904,0.00003347664,0.000038979957,0.000021125586,0.000010182211,0.000026725953,0.0011899632],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994827,0.000015369806,0.0001545749,0.0001295996,0.000072015406,0.00014573438],"domain_scores_gemma":[0.9996934,0.00004936907,0.000015002638,0.00018344226,0.000017108243,0.000041701995],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00008810834,0.000098796954,0.0000907082,0.000053662847,0.000022066708,0.000024193721,0.00006484657,0.000058394508,0.00041573102],"category_scores_gemma":[0.000010869269,0.000070634225,0.000019070336,0.000038246046,0.0000060945226,0.00013264622,0.0000041074086,0.000026771766,0.0008601929],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013807498,0.000011305814,0.001769311,0.00001274324,0.000012345869,0.0000013913718,0.000017878478,0.97720414,0.006590928,0.00095967617,0.008338687,0.0050677634],"study_design_scores_gemma":[0.00041600695,0.000039419054,0.0011338459,0.000030231537,0.0000036787328,8.5849234e-7,6.619451e-7,0.9868236,0.011116481,0.000011635438,0.0003016354,0.00012190334],"about_ca_topic_score_codex":0.000059102695,"about_ca_topic_score_gemma":0.0000754177,"teacher_disagreement_score":0.9598219,"about_ca_system_score_codex":0.00052395946,"about_ca_system_score_gemma":0.000046143905,"threshold_uncertainty_score":0.99991775},"labels":[],"label_agreement":null},{"id":"W2565521228","doi":"","title":"On the performance of updating Stochastic Dynamic Programming policy using Ensemble Streamflow Prediction in a snow-covered region","year":2014,"lang":"en","type":"article","venue":"2014 AGU Fall Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Streamflow; Snow; Computer science; Environmental science; Meteorology; Geography; Cartography; Drainage basin","score_opus":0.006817334310415236,"score_gpt":0.2067643694880938,"score_spread":0.19994703517767856,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2565521228","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8788162,0.000048418035,0.11925381,0.000019960404,0.00015360865,0.00036798205,0.0000013221314,0.00015071646,0.0011880156],"genre_scores_gemma":[0.99768525,0.000009823518,0.0020973207,0.000011501687,0.000089430534,0.000029167057,0.00001016972,0.000050868723,0.000016482243],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985871,0.00012331629,0.00046525704,0.0002111327,0.00023520736,0.00037801085],"domain_scores_gemma":[0.9991137,0.0003178613,0.00019627069,0.00027946342,0.000055549248,0.000037192684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007029821,0.00018903043,0.00022064384,0.00028017975,0.0001066056,0.000037321246,0.0001612387,0.00009947676,9.2363734e-7],"category_scores_gemma":[0.00054709276,0.0001687816,0.00004301885,0.00049655716,0.000019856685,0.00016826115,0.000027817976,0.0002187787,0.000006607788],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011992362,0.0000155429,0.004100679,0.00013539943,0.000013631121,3.8600723e-7,0.0004215098,0.9842527,0.003535495,0.0002526245,0.000024915853,0.0072351093],"study_design_scores_gemma":[0.00027787162,0.000085915875,0.0006880788,0.0010255409,0.000012587129,0.000009968551,0.000085833584,0.99675924,0.00087483274,0.000034134246,0.000007521017,0.00013845044],"about_ca_topic_score_codex":0.00047817692,"about_ca_topic_score_gemma":0.00020549483,"teacher_disagreement_score":0.118869066,"about_ca_system_score_codex":0.00031317334,"about_ca_system_score_gemma":0.000034658355,"threshold_uncertainty_score":0.68827134},"labels":[],"label_agreement":null},{"id":"W2567338541","doi":"","title":"Three Essays in Energy Economics and Industrial Organization, with Applications to Electricity and Distribution Networks","year":2014,"lang":"en","type":"dissertation","venue":"TSpace (University of Toronto)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electric power distribution; Electricity; Energy economics; Distribution (mathematics); Economics; Industrial organization; Environmental economics; Engineering; Neoclassical economics; Electrical engineering; Microeconomics; Mathematics","score_opus":0.004002623652388378,"score_gpt":0.16608536133231386,"score_spread":0.16208273767992548,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2567338541","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09474435,0.00078570814,0.9008352,0.00004924838,0.00009166378,0.00048192742,0.000019639192,0.00009389107,0.0028983399],"genre_scores_gemma":[0.9966822,0.0016637242,0.0005190649,0.000002336935,0.000045194796,0.0000026362711,0.0009082204,0.000028700444,0.00014788774],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945015,0.000017357324,0.000107229054,0.00021793459,0.00006128018,0.00014604548],"domain_scores_gemma":[0.99954456,0.00002820656,0.00010705619,0.00014378213,0.000101428755,0.00007495351],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000707136,0.00015556131,0.0002600297,0.00006743428,0.00007446451,0.00001892161,0.00010694985,0.0002826419,0.000048225735],"category_scores_gemma":[0.000008692137,0.00021064107,0.000011897615,0.00023557058,0.000014408602,0.00017247061,0.000016462442,0.00010204336,4.1385752e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006371401,0.00017015795,0.042355873,0.0006509102,0.0006529956,0.000005314242,0.00701039,0.6200811,0.00019424863,0.04480896,0.0049711964,0.27846166],"study_design_scores_gemma":[0.003914003,0.00047501476,0.29972646,0.00034211125,0.00047553328,0.000011739827,0.0030154102,0.683049,0.00024372702,0.0001316016,0.006791557,0.0018238197],"about_ca_topic_score_codex":0.014069614,"about_ca_topic_score_gemma":0.23465769,"teacher_disagreement_score":0.9019379,"about_ca_system_score_codex":0.0003800756,"about_ca_system_score_gemma":0.00004289039,"threshold_uncertainty_score":0.9924958},"labels":[],"label_agreement":null},{"id":"W2578461454","doi":"10.1016/j.epsr.2017.01.011","title":"Multi-period stochastic security-constrained OPF considering the uncertainty sources of wind power, load demand and equipment unavailability","year":2017,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":67,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Unavailability; Sensitivity (control systems); Electric power system; Computer science; Mathematical optimization; Reliability engineering; Wind power; Power flow; Transmission line; Power (physics); Control theory (sociology); Engineering; Mathematics","score_opus":0.028908790720970842,"score_gpt":0.29736249722318037,"score_spread":0.2684537065022095,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2578461454","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94461733,0.021497559,0.024338886,0.00022208794,0.0009559272,0.003216715,0.000034767003,0.0002595315,0.0048572184],"genre_scores_gemma":[0.99939495,0.000109331486,0.00006303355,0.0000036503927,0.00004570155,0.000097104465,0.0000022630782,0.000059370373,0.00022456258],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99559826,0.000621074,0.0008165554,0.0005827184,0.0012657788,0.0011155981],"domain_scores_gemma":[0.99675536,0.0007694845,0.0002463972,0.0013410555,0.0006421783,0.00024551875],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.005363174,0.0003683518,0.00064435625,0.00034136555,0.0009448511,0.00056413165,0.0008811727,0.00024167141,0.000038846265],"category_scores_gemma":[0.0017650552,0.0002962186,0.000091132,0.0005274476,0.0005458585,0.00029134072,0.00024474398,0.0008172008,0.000021335014],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013852002,0.0019364421,0.039410442,0.010562602,0.006346684,0.00071250414,0.09825272,0.6313339,0.17946896,0.011255754,0.012736462,0.00659831],"study_design_scores_gemma":[0.0032171682,0.0006896675,0.0046182694,0.0007277474,0.00006415415,0.0004765624,0.0020903777,0.9820074,0.003526129,0.00019404256,0.0014558658,0.00093261054],"about_ca_topic_score_codex":0.0005951366,"about_ca_topic_score_gemma":0.00008109929,"teacher_disagreement_score":0.3506735,"about_ca_system_score_codex":0.00061283004,"about_ca_system_score_gemma":0.0004449258,"threshold_uncertainty_score":0.999949},"labels":[],"label_agreement":null},{"id":"W2581295120","doi":"10.1049/iet-gtd.2016.0923","title":"Multi‐group particle swarm optimisation for transmission expansion planning solution based on LU decomposition","year":2017,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Particle swarm optimization; Decomposition; Group (periodic table); Mathematical optimization; Transmission (telecommunications); Computer science; Decomposition method (queueing theory); Mathematics; Physics; Chemistry; Telecommunications; Statistics; Quantum mechanics","score_opus":0.030106996117003647,"score_gpt":0.2837620201590405,"score_spread":0.2536550240420369,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2581295120","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05661778,0.00025235635,0.93990767,0.0005781717,0.0006955548,0.0011952375,0.000112121714,0.0005539196,0.000087160406],"genre_scores_gemma":[0.9626545,0.00008579429,0.031004988,0.000056805766,0.00027446216,0.0003224841,0.0054795262,0.00007389806,0.000047555775],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976123,0.00013453295,0.00069101434,0.0005696902,0.00048719702,0.0005052684],"domain_scores_gemma":[0.9986819,0.00007207468,0.0002416061,0.00055146805,0.0002088933,0.00024407703],"candidate_categories":["metaepi_narrow","sts"],"consensus_categories":[],"category_scores_codex":[0.0006226559,0.00040439452,0.00030744186,0.000119026816,0.0015344328,0.0003524552,0.00025129566,0.0003671842,0.000032342632],"category_scores_gemma":[0.00005976551,0.00041727314,0.00019816005,0.00017261427,0.000040778687,0.000846764,0.000007900043,0.00021046378,0.000013311983],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017709409,0.00016355728,0.00006130267,0.000091933915,0.000014745729,0.0000014815214,0.000127798,0.55871725,0.3943121,0.00008013802,0.0016818221,0.044570763],"study_design_scores_gemma":[0.0021196534,0.00022659842,0.0011176389,0.00020080722,0.000053189196,0.0000026777354,0.000013351521,0.71762955,0.2755328,0.000021576116,0.0027406367,0.00034154145],"about_ca_topic_score_codex":0.00001434626,"about_ca_topic_score_gemma":0.0000045605725,"teacher_disagreement_score":0.9089027,"about_ca_system_score_codex":0.00045647798,"about_ca_system_score_gemma":0.00005912814,"threshold_uncertainty_score":0.9998279},"labels":[],"label_agreement":null},{"id":"W2587544603","doi":"10.1109/tpwrs.2017.2665695","title":"A Fast Solution Method for Stochastic Transmission Expansion Planning","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Linearization; Reduction (mathematics); Stochastic programming; Computer science; Nonlinear system; Model order reduction; Benders' decomposition; Mathematics; Algorithm","score_opus":0.01999731207967152,"score_gpt":0.2772400854513618,"score_spread":0.25724277337169027,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2587544603","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00042904218,0.00031295078,0.9926319,0.000043656444,0.004034381,0.0011508871,0.000043846845,0.0005683016,0.0007850199],"genre_scores_gemma":[0.9911701,0.000011108339,0.007604743,0.000008604802,0.000040221108,0.0004271329,0.0000057911243,0.000099659606,0.0006326016],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983867,0.00007242932,0.00045898074,0.00035805753,0.00029448813,0.00042935694],"domain_scores_gemma":[0.9989416,0.00014592483,0.0001379659,0.0005301153,0.000098670695,0.000145728],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00042676044,0.00030257652,0.00036189315,0.00026606122,0.00077070243,0.00022104173,0.000294963,0.00024189924,0.000013366139],"category_scores_gemma":[0.000008621777,0.00030493367,0.0001641109,0.000117786665,0.00002140762,0.00041378872,7.7012703e-7,0.00023531549,0.000027686589],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007328899,0.00004900109,5.599845e-7,0.00016600525,0.00007726587,0.0000024105555,0.0007114065,0.9758275,0.0177344,0.000028960265,0.00055019493,0.004778964],"study_design_scores_gemma":[0.0009494325,0.0001677607,0.000018737648,0.00045552096,0.00007589457,0.00003920253,0.00010099506,0.9859057,0.010683715,0.000009870826,0.0012443917,0.00034879963],"about_ca_topic_score_codex":0.000056478366,"about_ca_topic_score_gemma":0.00000379485,"teacher_disagreement_score":0.9907411,"about_ca_system_score_codex":0.00021194751,"about_ca_system_score_gemma":0.000036239115,"threshold_uncertainty_score":0.9999403},"labels":[],"label_agreement":null},{"id":"W2589134274","doi":"10.20381/ruor-238","title":"Demand Response in the Ontario Electricity Market","year":2016,"lang":"en","type":"article","venue":"uO Research (University of Ottawa)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Demand response; Electricity market; Electricity; Business; Economics; Industrial organization; Engineering; Electrical engineering","score_opus":0.019698661007203414,"score_gpt":0.23089709722162213,"score_spread":0.21119843621441872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2589134274","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90222144,0.000047696576,0.02309521,0.0010057935,0.000043481585,0.0003778994,0.0000056234253,0.00006178385,0.073141046],"genre_scores_gemma":[0.99183166,0.000055857105,0.00033121277,0.000003999205,0.000008173866,7.046601e-7,7.844451e-7,0.0000080795335,0.0077595515],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9983479,0.0006297944,0.000091167145,0.0001394494,0.00044685084,0.00034488505],"domain_scores_gemma":[0.99875855,0.00078947935,0.000020661048,0.00028142842,0.000099105026,0.00005075735],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003231663,0.0000681265,0.00011600497,0.00046775703,0.00010228517,0.000012337094,0.0004911824,0.00007648223,0.00032685016],"category_scores_gemma":[0.00019070649,0.000054377484,0.000035988764,0.00085660827,0.00007609521,0.00019761207,0.000042394535,0.00024168153,0.000038201924],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014329745,0.00053110294,0.527718,0.00035026605,0.00034660433,0.0010002693,0.023761915,0.0053146547,0.05224151,0.009843013,0.35598314,0.021476556],"study_design_scores_gemma":[0.0019572964,0.00046031064,0.86419713,0.000114846815,0.000011585444,0.00002324053,0.0005822767,0.012052969,0.001570694,0.00037502343,0.1183785,0.00027611264],"about_ca_topic_score_codex":0.0009967295,"about_ca_topic_score_gemma":0.023351122,"teacher_disagreement_score":0.33647916,"about_ca_system_score_codex":0.0005621745,"about_ca_system_score_gemma":0.000112833775,"threshold_uncertainty_score":0.9944702},"labels":[],"label_agreement":null},{"id":"W2599098979","doi":"10.1016/j.ejor.2018.11.032","title":"Sustainable transmission planning in imperfectly competitive electricity industries: Balancing economic and environmental outcomes","year":2018,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"HEC Montréal; Aalto-Yliopisto; McGill University; National Science Foundation","keywords":"Economics; Oligopoly; Cournot competition; Microeconomics; Electricity; Incentive; Electricity market; Environmental economics; Variable cost; Industrial organization; Renewable energy; Electric power industry; Engineering","score_opus":0.017768946206609966,"score_gpt":0.2761366840218413,"score_spread":0.25836773781523137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2599098979","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98665446,0.00056118786,0.0051767346,0.00011894873,0.00006257839,0.00014864361,0.0000028331472,0.000011098342,0.007263501],"genre_scores_gemma":[0.999089,0.00010918568,0.00035402543,0.000013399375,0.00014777793,0.0000011925761,0.000004567245,0.000023378592,0.0002574759],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99851453,0.00042031295,0.000369339,0.00010831424,0.0002968714,0.00029065207],"domain_scores_gemma":[0.9994679,0.00024263006,0.00004073972,0.000058304013,0.000093736155,0.00009667231],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025422415,0.00009343285,0.00015427294,0.00039679126,0.00016743616,0.000105144136,0.0001372552,0.000028620105,0.00009008606],"category_scores_gemma":[0.00014404014,0.00008492503,0.000019541145,0.00017288889,0.0000642974,0.0003779242,0.000029422128,0.00046854172,0.000017735887],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008272221,0.00033263883,0.43557417,0.00025907005,0.00048792164,0.002346513,0.025562286,0.40133527,0.08439531,0.008341731,0.013652692,0.026885195],"study_design_scores_gemma":[0.0071858047,0.003836964,0.5334786,0.00076001155,0.000026889142,0.00084611407,0.010462907,0.37966818,0.03432672,0.00012635716,0.02828164,0.0009997935],"about_ca_topic_score_codex":0.0000089882,"about_ca_topic_score_gemma":0.0000014164414,"teacher_disagreement_score":0.09790447,"about_ca_system_score_codex":0.0004663794,"about_ca_system_score_gemma":0.0001336984,"threshold_uncertainty_score":0.34631422},"labels":[],"label_agreement":null},{"id":"W2600907557","doi":"10.5547/01956574.39.6.sdeb","title":"Evaluating an Interconnection Project: Do Strategic Interactions Matter?","year":2018,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"HEC Montréal","funders":"","keywords":"Interconnection; Unbundling; Arbitrage; Industrial organization; Economics; Electricity market; Microeconomics; Imperfect competition; Hydroelectricity; Electricity; Business; Computer science; Telecommunications; Engineering; Electrical engineering; Financial economics","score_opus":0.04955678065341152,"score_gpt":0.3230700957731208,"score_spread":0.2735133151197093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2600907557","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6881174,0.00023038647,0.2626037,0.00014446484,0.0042694043,0.000108796965,0.0000012159586,0.0002812915,0.044243373],"genre_scores_gemma":[0.9974015,0.00001748413,0.00095167774,0.000045197656,0.0012199446,0.000010529116,0.000002377696,0.000030139481,0.000321193],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916065,0.00016316972,0.00024852675,0.000089751054,0.00014836437,0.00018956234],"domain_scores_gemma":[0.99954754,0.000029779832,0.00008086883,0.00017436486,0.0001239438,0.00004347624],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044223026,0.00010467781,0.00008347078,0.00014725438,0.00025833334,0.00021774927,0.00018182556,0.000035109468,0.00039574562],"category_scores_gemma":[0.000012654663,0.00007640129,0.000036360012,0.00021465284,0.000020865104,0.0003885951,0.000013001631,0.00022880932,0.00004278216],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015558,0.00017611122,0.00039583573,0.000048328206,0.0006604466,0.000021431617,0.013612969,0.72410816,0.12581873,0.012049949,0.019729901,0.10322255],"study_design_scores_gemma":[0.00031000492,0.00034869742,0.00011295557,0.00009908279,0.000042883566,0.0021206033,0.0011029426,0.98611856,0.0051164636,0.0029879373,0.0014198361,0.00022002551],"about_ca_topic_score_codex":0.00003655582,"about_ca_topic_score_gemma":0.00006522671,"teacher_disagreement_score":0.3092841,"about_ca_system_score_codex":0.00014386074,"about_ca_system_score_gemma":0.00003585371,"threshold_uncertainty_score":0.4333137},"labels":[],"label_agreement":null},{"id":"W2603728065","doi":"10.11575/prism/30162","title":"A Review of Alberta's Default Rate for Electricity","year":2016,"lang":"en","type":"review","venue":"Open MIND","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Economics; Environmental science; Natural resource economics; Engineering; Electrical engineering","score_opus":0.03886046301839999,"score_gpt":0.33186060466113426,"score_spread":0.29300014164273425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2603728065","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[3.6397424e-8,0.9724815,0.008902984,0.000007438117,0.0001865012,0.003590381,0.00006543534,0.0000042513434,0.014761467],"genre_scores_gemma":[2.3600774e-7,0.994489,0.0020654723,0.000010981889,0.000056660916,0.00043882753,0.00012270168,0.00008249576,0.0027336248],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983523,0.00011943951,0.00086627016,0.0002936694,0.000087402426,0.00028095112],"domain_scores_gemma":[0.99852186,0.00049024686,0.00036584257,0.00045601148,0.00010708046,0.000058937596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007061076,0.00032642888,0.0018098695,0.000118464355,0.000021881613,0.000035147743,0.0006915959,0.00021037801,0.00044428947],"category_scores_gemma":[0.000336997,0.0002404215,0.00030632658,0.00049894006,0.000008494963,0.00012033459,0.000055095,0.000113761555,0.00031849195],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010161859,0.000006350686,1.982187e-8,0.08510288,0.0001207756,3.747343e-7,0.000005087144,0.0000035053563,8.6660293e-7,0.0000058962996,0.0074672685,0.9072859],"study_design_scores_gemma":[0.00010915967,0.000024953357,8.462882e-9,0.17236337,0.00036862874,0.0000104573855,1.1831639e-7,0.00013196866,0.000029367695,0.00000261328,0.8267284,0.00023096877],"about_ca_topic_score_codex":0.00001292688,"about_ca_topic_score_gemma":0.000015157342,"teacher_disagreement_score":0.90705496,"about_ca_system_score_codex":0.00016216518,"about_ca_system_score_gemma":0.00022815124,"threshold_uncertainty_score":0.98041046},"labels":[],"label_agreement":null},{"id":"W2604030907","doi":"10.1016/j.enpol.2017.02.053","title":"The merit order effect of Czech photovoltaic plants","year":2017,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Australian National University; Grantová Agentura České Republiky; European Commission; McGill University","keywords":"Renewable energy; Photovoltaic system; Czech; Electricity; Electricity generation; Spot contract; Grid parity; Environmental economics; Economics; Feed-in tariff; Environmental science; Natural resource economics; Photovoltaics; Engineering; Power (physics); Energy policy; Electrical engineering; Physics; Financial economics","score_opus":0.0032341391160333028,"score_gpt":0.22227671609326116,"score_spread":0.21904257697722787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2604030907","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5526314,0.0044508018,0.029379096,0.00045548272,0.0035376006,0.00062306353,0.000042409116,0.0010079278,0.40787226],"genre_scores_gemma":[0.9983417,0.00027840643,0.000054313772,0.000011549379,0.00019472552,0.000025649502,0.000003407128,0.000027928221,0.0010623623],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99941045,0.000035955225,0.00014218417,0.00007998532,0.00011400642,0.00021741484],"domain_scores_gemma":[0.99926615,0.00009606457,0.000068322835,0.00051013107,0.000021002403,0.000038352595],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013695487,0.00010772047,0.0001439115,0.00006703629,0.00018615622,0.000048536956,0.0003268747,0.000060938975,0.000006768244],"category_scores_gemma":[0.00016743054,0.00007650757,0.00003416711,0.00009728375,0.000033704247,0.00007414983,0.000031108466,0.000054367607,0.000011386468],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026720105,0.00007875773,0.007286313,0.0006235742,0.0014988078,0.00004601277,0.0012725506,0.24828614,0.3011562,0.05953801,0.06354309,0.31640336],"study_design_scores_gemma":[0.0012127453,0.00018541257,0.002517589,0.00009038275,0.000028694463,0.000029197574,0.000006294595,0.153342,0.7457395,0.00036057452,0.09608297,0.000404648],"about_ca_topic_score_codex":0.0013297122,"about_ca_topic_score_gemma":0.00013075034,"teacher_disagreement_score":0.4457103,"about_ca_system_score_codex":0.000044070766,"about_ca_system_score_gemma":0.00002512063,"threshold_uncertainty_score":0.3119888},"labels":[],"label_agreement":null},{"id":"W2605027696","doi":"10.1214/16-aoas1002","title":"Electricity price dependence in New York State zones: A robust detrended correlation approach","year":2017,"lang":"en","type":"article","venue":"The Annals of Applied Statistics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Econometrics; Electricity; Detrended fluctuation analysis; Grid; Estimator; Electricity price; Computer science; Economics; Statistics; Mathematics","score_opus":0.0574632283859776,"score_gpt":0.26386248696745934,"score_spread":0.20639925858148173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2605027696","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032700603,0.00022170467,0.9817686,0.000021574633,0.00011291089,0.00039376435,0.000039157454,0.00007581488,0.014096388],"genre_scores_gemma":[0.94782096,0.00020499184,0.051577132,0.000018678456,0.000039918777,0.000018513003,0.000031253334,0.000035604215,0.00025292076],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998769,0.000029357008,0.00040379833,0.00017918077,0.0002902815,0.00032838914],"domain_scores_gemma":[0.99886656,0.00017446729,0.00028258428,0.00053807977,0.00007245247,0.000065837114],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004519231,0.00017146532,0.00025464693,0.00011568837,0.00012850111,0.000077333476,0.0004799227,0.00007659463,0.0000071604577],"category_scores_gemma":[0.0001306881,0.00015414247,0.000022304,0.00029305424,0.00004285192,0.000104726096,0.000035941917,0.00023911102,0.000012201267],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000073992545,0.000041712374,0.00022692533,0.000112838425,0.000046260124,0.0000015449696,0.0011105892,0.96198416,0.00020975739,0.018528149,0.004021719,0.013642329],"study_design_scores_gemma":[0.00042484538,0.00003712566,0.0069632563,0.000029551726,0.00001988436,0.0000032617675,0.000050085026,0.98187983,0.0014942354,0.00871611,0.00014933705,0.00023248965],"about_ca_topic_score_codex":0.00020375715,"about_ca_topic_score_gemma":0.0001418633,"teacher_disagreement_score":0.94455093,"about_ca_system_score_codex":0.000043309992,"about_ca_system_score_gemma":0.00008814939,"threshold_uncertainty_score":0.6285747},"labels":[],"label_agreement":null},{"id":"W2605900105","doi":"","title":"Cost of Carbon Emissions Abatement in the Ontario Electricity Market: 2006 to 2011","year":2014,"lang":"en","type":"article","venue":"Energy & the Economy,37th IAEE International Conference,June 15-18, 2014","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Natural resource economics; Electricity; Greenhouse gas; Electricity market; Environmental economics; Electricity system; Business; Economics; Electricity generation; Environmental science; Engineering; Power (physics)","score_opus":0.018641017634958443,"score_gpt":0.22678006671450246,"score_spread":0.208139049079544,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2605900105","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0628737,0.00022899926,0.065546945,0.0026557003,0.0025991113,0.0008549695,0.00003452064,0.00014350792,0.86506253],"genre_scores_gemma":[0.98810446,0.00006309401,0.00018284928,0.0003588071,0.00021306887,0.00022256335,0.00005229857,0.000035179848,0.010767665],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979473,0.000210018,0.00076582626,0.0003467352,0.00032006038,0.00041005967],"domain_scores_gemma":[0.99863154,0.00027279783,0.00022139993,0.00055947533,0.00021221463,0.000102601414],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0009817914,0.00030894374,0.00035722222,0.00035723223,0.00007560238,0.000101338745,0.0011232042,0.00012559228,0.003475679],"category_scores_gemma":[0.000062164625,0.00023346698,0.00010259666,0.00022973679,0.000041415657,0.00015624883,0.000092313676,0.00030980448,0.000058938338],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032363966,0.00047870577,0.041606363,0.00008772417,0.0011164396,0.000013313559,0.005650269,0.33271685,0.0024180196,0.114980586,0.48887244,0.0117356535],"study_design_scores_gemma":[0.0012990767,0.00018553932,0.010185601,0.00014965307,0.00006556614,0.000026018935,0.00017172087,0.43756956,0.0062735593,0.0032260367,0.5400577,0.000789924],"about_ca_topic_score_codex":0.012769975,"about_ca_topic_score_gemma":0.0359591,"teacher_disagreement_score":0.9252308,"about_ca_system_score_codex":0.000517635,"about_ca_system_score_gemma":0.00016292116,"threshold_uncertainty_score":0.9974353},"labels":[],"label_agreement":null},{"id":"W2606364002","doi":"","title":"The Effects of Market Deregulation on Electricity Rates in U.S. and Canada","year":2014,"lang":"en","type":"article","venue":"Energy & the Economy,37th IAEE International Conference,June 15-18, 2014","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Deregulation; Electricity market; Electricity; Business; Economics; Market economy; Engineering","score_opus":0.004174158694086862,"score_gpt":0.18287811897443518,"score_spread":0.17870396028034832,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2606364002","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53213745,0.0019358181,0.04796322,0.004368201,0.007884428,0.00107878,0.000029354154,0.0002454482,0.4043573],"genre_scores_gemma":[0.99735945,0.0002906447,0.000031620086,0.00014791118,0.00013537631,0.00006101017,0.000022511796,0.000024544834,0.0019269297],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986853,0.00017954646,0.00044569763,0.00023004407,0.00019804218,0.0002613964],"domain_scores_gemma":[0.9982923,0.0010579232,0.00018100173,0.00027898996,0.00013573565,0.000054029057],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045379152,0.00021429961,0.0002404723,0.0001555293,0.00009412032,0.00009293224,0.00042102975,0.0000812391,0.00016284824],"category_scores_gemma":[0.00018435658,0.00016026989,0.000038736827,0.00013157263,0.000052045303,0.00013779715,0.00004143372,0.0001650502,0.000003762982],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039408356,0.00013072969,0.03313318,0.0003076014,0.0011665156,0.000010631831,0.00048184826,0.15209979,0.002798263,0.4863148,0.27281046,0.0503521],"study_design_scores_gemma":[0.001034338,0.000111142435,0.017790668,0.00013726536,0.000021906555,0.000010687641,0.00003412469,0.8938251,0.016437741,0.0065181083,0.06366779,0.00041112798],"about_ca_topic_score_codex":0.025968408,"about_ca_topic_score_gemma":0.1672428,"teacher_disagreement_score":0.7417253,"about_ca_system_score_codex":0.00024816918,"about_ca_system_score_gemma":0.00013877288,"threshold_uncertainty_score":0.98051775},"labels":[],"label_agreement":null},{"id":"W2606383594","doi":"10.1109/tii.2017.2695122","title":"Improved Random Drift Particle Swarm Optimization With Self-Adaptive Mechanism for Solving the Power Economic Dispatch Problem","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":119,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Particle swarm optimization; Mathematical optimization; Economic dispatch; Crossover; Benchmark (surveying); Multi-swarm optimization; Position (finance); Computer science; Metaheuristic; Imperialist competitive algorithm; Meta-optimization; Power (physics); Electric power system; Algorithm; Mathematics; Artificial intelligence","score_opus":0.01552880190210809,"score_gpt":0.2090435726441396,"score_spread":0.19351477074203152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2606383594","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008122041,0.00000290239,0.9876363,0.00012477343,0.0011224898,0.0019022725,0.000048472717,0.00030606822,0.0007346651],"genre_scores_gemma":[0.97519165,0.000020541831,0.024083314,0.0000296963,0.000088225075,0.00045387374,0.000004949924,0.00005393698,0.0000738078],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987834,0.000021487182,0.0005763561,0.00011707428,0.00014866148,0.00035303467],"domain_scores_gemma":[0.9988703,0.00015853319,0.0002892595,0.00048767315,0.00010934835,0.00008486622],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034758088,0.00024504127,0.0002591867,0.0000743791,0.00076578534,0.00038575448,0.00031188538,0.00021416595,0.000014879237],"category_scores_gemma":[0.000013425396,0.0001873353,0.00008901924,0.00008978237,0.000035564197,0.00097581564,0.0000022196937,0.00032281046,0.000013261231],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001792543,0.000027400512,0.0000022218667,0.000020014551,0.00018212409,1.5227832e-7,0.0012669961,0.99675894,0.00003439313,0.00046316418,0.00016414834,0.0009011989],"study_design_scores_gemma":[0.0042161257,0.00029674216,6.187498e-7,0.00005479039,0.00012543963,0.000005655205,0.00032884022,0.97077507,0.023855356,0.000036452195,0.000061072446,0.00024381507],"about_ca_topic_score_codex":0.000036898695,"about_ca_topic_score_gemma":0.000059791844,"teacher_disagreement_score":0.9670696,"about_ca_system_score_codex":0.00026271725,"about_ca_system_score_gemma":0.00011355858,"threshold_uncertainty_score":0.7639312},"labels":[],"label_agreement":null},{"id":"W2609705870","doi":"","title":"Interview with Clair Moeller","year":2015,"lang":"en","type":"article","venue":"University of Minnesota Digital Conservancy (University of Minnesota)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.014856709068646804,"score_gpt":0.15649960942847144,"score_spread":0.14164290035982463,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2609705870","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77120394,0.0018470188,0.1100872,0.001324837,0.0003784867,0.0008044712,0.0003231886,0.0006509865,0.113379866],"genre_scores_gemma":[0.9916824,0.00027759676,0.0038653181,0.000017430742,0.000014226493,6.143586e-8,0.000079076905,0.000038672315,0.004025201],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987031,0.0000589339,0.00019722136,0.00031601088,0.00036800987,0.0003567206],"domain_scores_gemma":[0.9985469,0.000081576,0.00019479933,0.000450923,0.00045917308,0.00026661804],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018056775,0.0002732767,0.0005299117,0.00031153802,0.00008852927,0.000018016248,0.00062738283,0.00016398031,0.00014114403],"category_scores_gemma":[0.000024657957,0.0003572054,0.00015501404,0.00073153514,0.00030949892,0.001348585,0.00015657162,0.0001587701,0.00007991348],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0043622362,0.0024599493,0.07578067,0.0059535657,0.004810368,0.003243618,0.04564136,0.059836682,0.0018276842,0.006826555,0.7188042,0.07045311],"study_design_scores_gemma":[0.013590994,0.0019098889,0.0061539905,0.0017136077,0.0007204258,0.00030921045,0.051539786,0.051239327,0.0007483281,0.00026101293,0.86923814,0.0025752783],"about_ca_topic_score_codex":0.0001302152,"about_ca_topic_score_gemma":0.00040652987,"teacher_disagreement_score":0.22047848,"about_ca_system_score_codex":0.00018422936,"about_ca_system_score_gemma":0.00016340938,"threshold_uncertainty_score":0.999888},"labels":[],"label_agreement":null},{"id":"W2610928412","doi":"","title":"Corrections to “Impacts of Strategic Bidding of Wind Power Producers on Electricity Markets”","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Bidding; Wind power; Electricity; Electricity market; Industrial organization; Environmental economics; Electricity generation; Economics; Power (physics); Business; Microeconomics; Natural resource economics; Engineering; Electrical engineering; Physics","score_opus":0.01899900792004544,"score_gpt":0.23931878113299124,"score_spread":0.2203197732129458,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2610928412","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49779987,0.00012052837,0.46223548,0.000048968494,0.008506404,0.0014590897,0.00011445829,0.00032880928,0.0293864],"genre_scores_gemma":[0.99925226,0.000024271287,0.0000843267,0.0000081588105,0.000018592023,0.000043837597,0.0000014846015,0.000074249394,0.0004928116],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9980174,0.00009668269,0.0006643897,0.00035364562,0.00044923794,0.00041867406],"domain_scores_gemma":[0.9981864,0.000117554104,0.0002831988,0.0010264129,0.00021052209,0.0001759094],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004342156,0.00031203666,0.00050558394,0.00067176536,0.000251169,0.000100038786,0.0003800603,0.0001851404,0.000054609853],"category_scores_gemma":[0.000037432867,0.000319365,0.00015280173,0.0005895975,0.0000410683,0.00026414558,0.000001522706,0.00030874574,0.00004437308],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022996198,0.00035612652,0.00019227114,0.00036392867,0.00043831885,0.0000067366336,0.0010170144,0.94500977,0.050685246,0.0002744559,0.0011046819,0.000321484],"study_design_scores_gemma":[0.003926753,0.005207137,0.009490671,0.0042272415,0.00045322164,0.00015313493,0.0016513459,0.1785463,0.7914269,0.000036089317,0.0020874392,0.0027937526],"about_ca_topic_score_codex":0.00020786372,"about_ca_topic_score_gemma":0.00003393456,"teacher_disagreement_score":0.76646346,"about_ca_system_score_codex":0.00031064014,"about_ca_system_score_gemma":0.00008994849,"threshold_uncertainty_score":0.99992585},"labels":[],"label_agreement":null},{"id":"W2611804852","doi":"10.5547/01956574.38.2.ddim","title":"Is Productivity Growth in Electricity Distribution Negative? An Empirical Analysis Using Ontario Data","year":2016,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Productivity; Econometrics; Electricity; Robustness (evolution); Economics; Electric power distribution; Parametric statistics; Distribution (mathematics); Index (typography); Statistics; Computer science; Mathematics; Engineering; Macroeconomics","score_opus":0.0335482927463454,"score_gpt":0.266312542570791,"score_spread":0.2327642498244456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2611804852","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46532738,0.000064379485,0.53418624,0.00018866465,0.00010065282,0.00002919999,0.000012516954,0.000031285294,0.00005966466],"genre_scores_gemma":[0.9991395,0.00004025766,0.0005078908,0.000016404363,0.00018726238,0.0000016602743,0.000022680617,0.0000146614,0.00006966912],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986525,0.000268868,0.00030206764,0.00022050789,0.00025611,0.00029993392],"domain_scores_gemma":[0.99921745,0.00006635856,0.000102025486,0.00044611006,0.00008989295,0.00007814254],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085295015,0.0001370138,0.00021245198,0.00019186772,0.00013286942,0.000066240755,0.0004427574,0.00006524746,0.00004718253],"category_scores_gemma":[0.00011449373,0.0000831205,0.000052517375,0.0013220654,0.00002451811,0.00075836305,0.000049439877,0.00024342524,0.0000012897337],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002128678,0.00044227048,0.5166688,0.000017882818,0.0025350635,0.000060282127,0.0038159906,0.43320328,0.014959291,0.00065310893,0.005441804,0.021989396],"study_design_scores_gemma":[0.00069015776,0.00007355681,0.11847684,0.0000407348,0.00043383372,0.00023150272,0.000022471451,0.86259645,0.014907177,0.0014027756,0.00070187356,0.00042263704],"about_ca_topic_score_codex":0.003327846,"about_ca_topic_score_gemma":0.014079355,"teacher_disagreement_score":0.5338121,"about_ca_system_score_codex":0.0010235023,"about_ca_system_score_gemma":0.00013062725,"threshold_uncertainty_score":0.78566104},"labels":[],"label_agreement":null},{"id":"W2625034686","doi":"10.5547/01956574.39.1.dolm","title":"Ontario's Auction Market for Financial Transmission Rights: An Analysis of its Efficiency","year":2017,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Common value auction; Clearing; Microeconomics; Economics; Electricity; Business; Payment; Electricity market; Dutch auction; Reverse auction; Forward auction; Revenue equivalence; Auction theory; Finance","score_opus":0.007135290423424579,"score_gpt":0.21367130712984775,"score_spread":0.20653601670642316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2625034686","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.060742788,0.00027003972,0.9356906,0.000046851033,0.00055634434,0.000058332447,0.0000032179537,0.000023772987,0.0026080676],"genre_scores_gemma":[0.9982303,0.000061787134,0.0006297908,0.000005096111,0.00015482308,0.0000049790574,0.000004213967,0.00000956987,0.0008994652],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932617,0.000041814037,0.00025114472,0.00007603999,0.00015333854,0.0001515084],"domain_scores_gemma":[0.9994405,0.000022725932,0.00016053328,0.00023288971,0.00008910562,0.00005423241],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044302997,0.00008644705,0.00017437073,0.00016872675,0.00047948372,0.00006680241,0.0003087391,0.000062820756,0.00017286176],"category_scores_gemma":[0.000022145461,0.000059171973,0.00012919995,0.00013509467,0.000014808106,0.0003004356,0.0000053419467,0.00010034071,2.474773e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000093846844,0.000043636624,0.00011628024,0.00001335912,0.00032217635,0.0000023340083,0.0008252501,0.98060834,0.0020331221,0.0010770238,0.0011270547,0.013737593],"study_design_scores_gemma":[0.0004026418,0.00009783852,0.006431933,0.00003303831,0.00045653028,0.000024458179,0.000007110583,0.97267324,0.004741841,0.00036522676,0.014647578,0.00011856622],"about_ca_topic_score_codex":0.0006388077,"about_ca_topic_score_gemma":0.004294163,"teacher_disagreement_score":0.9374875,"about_ca_system_score_codex":0.00011686189,"about_ca_system_score_gemma":0.00004917728,"threshold_uncertainty_score":0.36878493},"labels":[],"label_agreement":null},{"id":"W2629831979","doi":"10.1109/ccece.2017.7946600","title":"Linearized power flow for stochastic optimization","year":2017,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Mathematical optimization; Economic dispatch; Computer science; Electric power system; Computation; Linear programming; Piecewise linear function; Power (physics); Iterative method; Piecewise; Power flow; Stochastic programming; AC power; Control theory (sociology); Algorithm; Mathematics","score_opus":0.009241897045171326,"score_gpt":0.22431749205290405,"score_spread":0.2150755950077327,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2629831979","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00009047999,0.00006022666,0.989282,0.000058693167,0.0006891821,0.00036917362,0.0000051473125,0.00034967528,0.009095388],"genre_scores_gemma":[0.73068655,0.000008604703,0.26751888,0.000022312059,0.00010084964,0.00008182535,0.000028904178,0.000054721688,0.0014973516],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994975,0.0000046584037,0.00014451506,0.00010963832,0.00007577255,0.00016793566],"domain_scores_gemma":[0.999477,0.000033904198,0.000038877628,0.000336094,0.00007190004,0.000042205604],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009677377,0.00009519007,0.00011604023,0.000050516992,0.00015411044,0.00013064787,0.00015726224,0.00006950138,0.0001054439],"category_scores_gemma":[0.00016072678,0.00009333273,0.000037358644,0.000035519843,0.000009474095,0.00021288589,0.000012906341,0.00003980292,0.000022704451],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000059456183,0.000004612093,0.0000047001513,0.000012140519,0.000016417145,1.8107713e-7,0.000028555416,0.9976068,0.00010830473,0.00019281235,0.0016247276,0.00039480688],"study_design_scores_gemma":[0.00054224674,0.000022662938,0.00001954679,0.000010447786,0.000010187135,0.0000016748286,0.0000030743818,0.9987331,0.00024660988,0.00003644258,0.00025682195,0.00011718129],"about_ca_topic_score_codex":0.000003038548,"about_ca_topic_score_gemma":0.0000030053047,"teacher_disagreement_score":0.73059607,"about_ca_system_score_codex":0.000039294817,"about_ca_system_score_gemma":0.000011594765,"threshold_uncertainty_score":0.38059983},"labels":[],"label_agreement":null},{"id":"W2633027710","doi":"10.1109/ccece.2017.7946626","title":"A new realistic optimization-free economic load dispatch method based on maps gathered from sliced fuel-cost curves","year":2017,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Slicing; Mathematical optimization; Computer science; Dimension (graph theory); Heuristic; Optimization problem; Function (biology); Key (lock); Automation; Set (abstract data type); Power system simulation; Field (mathematics); Point (geometry); Discrete optimization; Power (physics); Algorithm; Electric power system; Mathematics; Engineering","score_opus":0.012167432853258971,"score_gpt":0.24840263893381676,"score_spread":0.23623520608055779,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2633027710","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00005943273,0.00023707261,0.94461805,0.00064052106,0.0006251698,0.0005185038,0.00016461802,0.0004756849,0.052660953],"genre_scores_gemma":[0.16230084,0.0006284725,0.8294317,0.00065257814,0.0006850449,0.0002088764,0.0009250949,0.00034357313,0.004823786],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99861586,0.000077677265,0.00038829076,0.0003840782,0.00021816975,0.0003159167],"domain_scores_gemma":[0.99762666,0.00027137052,0.00016309817,0.001705484,0.000051719915,0.00018169402],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00028717777,0.00028998466,0.00035735767,0.00009134833,0.00013231637,0.00024169522,0.00075968704,0.00014251085,0.0010642165],"category_scores_gemma":[0.00034510164,0.00029326312,0.00008535126,0.0000760972,0.000012991494,0.0002883443,0.00004984988,0.00013803231,0.00015431053],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020659378,0.000011410612,0.00019185571,0.0000631962,0.000049754854,0.0000025123873,0.000042074695,0.9515349,0.000036870846,0.00022437282,0.0466862,0.0011361587],"study_design_scores_gemma":[0.0013166113,0.000027977536,0.0006775168,0.00019363589,0.000052676736,0.0000011366643,0.0000052117543,0.9956198,0.00036465554,0.00027068818,0.0011252307,0.00034489066],"about_ca_topic_score_codex":0.0050076903,"about_ca_topic_score_gemma":0.0015754804,"teacher_disagreement_score":0.16224141,"about_ca_system_score_codex":0.00042015768,"about_ca_system_score_gemma":0.00015687158,"threshold_uncertainty_score":0.99995196},"labels":[],"label_agreement":null},{"id":"W2729205445","doi":"","title":"Alberta wholesale electricity market - Government and industry study","year":2013,"lang":"en","type":"article","venue":"Energy Transition and Policy Challenges,36th IAEE International Conference,June 16-20, 2013","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Government (linguistics); Electricity; Electricity market; Electricity retailing; Wholesale market; Commerce; Industrial organization; Engineering; Electrical engineering","score_opus":0.013327608459823373,"score_gpt":0.22211750406308808,"score_spread":0.20878989560326472,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2729205445","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30269927,0.006046505,0.03630847,0.06769079,0.0024884222,0.0021628595,0.0004377436,0.0009423244,0.5812236],"genre_scores_gemma":[0.9842475,0.0041933674,0.000082684564,0.00036929495,0.00035349737,0.0001763568,0.00007677888,0.000049459555,0.010451065],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980952,0.0001328972,0.0004575906,0.00042223505,0.0005081284,0.00038396363],"domain_scores_gemma":[0.99918073,0.000099829485,0.00009508381,0.0002283699,0.0001574443,0.00023851216],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0001784563,0.0003668428,0.00032381792,0.0002596752,0.0000978022,0.00017647809,0.00022702474,0.00031355274,0.0010685826],"category_scores_gemma":[0.000021431595,0.0003782978,0.000051994662,0.00019995421,0.00005328036,0.00048780095,0.000041396495,0.0003686351,0.000024307912],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006345271,0.0040518367,0.0024440726,0.0010386109,0.005676826,0.00008606569,0.040949803,0.021993943,0.008426257,0.33697748,0.3373152,0.24040537],"study_design_scores_gemma":[0.008888585,0.0012132607,0.012381214,0.00053489563,0.00022885627,0.0003228573,0.00537325,0.6274258,0.0016430948,0.008655651,0.33024895,0.003083575],"about_ca_topic_score_codex":0.004439964,"about_ca_topic_score_gemma":0.005298767,"teacher_disagreement_score":0.68154824,"about_ca_system_score_codex":0.00024790602,"about_ca_system_score_gemma":0.00005587924,"threshold_uncertainty_score":0.9998669},"labels":[],"label_agreement":null},{"id":"W2731558198","doi":"10.55016/ojs/sppp.v9i1.42598","title":"The Challenge of Integrating Renewable Generation in the Alberta Electricity Market","year":2016,"lang":"en","type":"article","venue":"The School of Public Policy Publications","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Renewable energy; Electricity market; Electricity; Electricity retailing; Electricity generation; Business; Natural resource economics; Environmental economics; Economics; Engineering; Electrical engineering; Power (physics)","score_opus":0.021520033174254133,"score_gpt":0.24959826096645066,"score_spread":0.22807822779219653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2731558198","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01915039,0.0028602486,0.11553841,0.28846526,0.0003440892,0.0025149721,0.000060931998,0.00032353355,0.57074213],"genre_scores_gemma":[0.9961353,0.0006024813,0.00017123886,0.00007945709,0.00021721626,0.00027061705,0.000011421857,0.000023476761,0.0024888092],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980011,0.00046721858,0.00064530165,0.00015933224,0.00032490617,0.00040214608],"domain_scores_gemma":[0.9972987,0.0010791771,0.00024878158,0.0010170705,0.000290236,0.00006601031],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026569334,0.0001476326,0.00017011151,0.00037992618,0.00021006014,0.00012629542,0.0011169483,0.00008626453,0.00007285819],"category_scores_gemma":[0.0049830126,0.00006758631,0.0000714801,0.0025555047,0.000095491145,0.00053712574,0.00004647449,0.0001889397,0.000011434173],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000103620105,0.00021346094,0.003149334,0.00005711398,0.00023176223,1.03921394e-7,0.0017217261,0.003041682,0.012431186,0.7173563,0.23075686,0.031030063],"study_design_scores_gemma":[0.0036130315,0.00045948333,0.059227973,0.0002776079,0.0001753404,0.000070619106,0.0014383674,0.44936216,0.014979372,0.047369555,0.42139632,0.0016301577],"about_ca_topic_score_codex":0.0021599794,"about_ca_topic_score_gemma":0.0057906923,"teacher_disagreement_score":0.9769849,"about_ca_system_score_codex":0.00023324354,"about_ca_system_score_gemma":0.0003555992,"threshold_uncertainty_score":0.59654915},"labels":[],"label_agreement":null},{"id":"W2741065565","doi":"10.32040/2242-122x.2019.t350","title":"Design and operation of power systems with large amounts of wind power: Final summary report, IEA WIND Task 25, Phase four 2015-2017","year":2019,"lang":"en","type":"article","venue":"Publikationsdatenbank der Fraunhofer-Gesellschaft (Fraunhofer-Gesellschaft)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Wind power; Flexibility (engineering); Electric power system; Reliability engineering; Electricity; Grid; Stand-alone power system; Computer science; Environmental economics; Reliability (semiconductor); Power (physics); Automotive engineering; Engineering; Renewable energy; Electrical engineering; Distributed generation; Economics","score_opus":0.013904508215785552,"score_gpt":0.2367887213154214,"score_spread":0.22288421309963585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2741065565","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.52747834,0.012149622,0.43679106,0.0006206903,0.0037868372,0.008659458,0.0009997453,0.0010370419,0.008477224],"genre_scores_gemma":[0.9878138,0.0007826951,0.005994187,0.000098026896,0.00018685278,0.00016085774,0.0011021596,0.00044528383,0.0034161706],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9894141,0.00088759005,0.0034388471,0.0019281639,0.0023059885,0.0020253216],"domain_scores_gemma":[0.99181527,0.0008116379,0.0016553282,0.0028364712,0.0021127006,0.0007686036],"candidate_categories":["metaepi_narrow"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.0037140178,0.0016248558,0.0023417808,0.0021015154,0.0004602292,0.000585976,0.0013317309,0.0011691899,0.0006686223],"category_scores_gemma":[0.00037564928,0.0015812613,0.00031801878,0.002486744,0.00031663346,0.0036802487,0.00030119467,0.0013264903,0.00034618593],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002657971,0.0056750113,0.04160206,0.0062494846,0.0068025845,0.0009619698,0.011576665,0.7184479,0.077040635,0.0054801134,0.12256223,0.00094333076],"study_design_scores_gemma":[0.04435627,0.007966609,0.021967918,0.0048294454,0.0028440433,0.004810685,0.004150899,0.799613,0.038108755,0.0006154253,0.060082678,0.010654295],"about_ca_topic_score_codex":0.00024825413,"about_ca_topic_score_gemma":0.000039957533,"teacher_disagreement_score":0.46033543,"about_ca_system_score_codex":0.0004998268,"about_ca_system_score_gemma":0.0007887927,"threshold_uncertainty_score":0.9996499},"labels":[],"label_agreement":null},{"id":"W2742926814","doi":"10.1109/cjece.2016.2611680","title":"Temporal and Spatial Load Management Methods for Cost and Emission Reduction","year":2017,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Science Foundation","keywords":"Computer science; Load management; Reduction (mathematics); Electric power system; Cost reduction; Load balancing (electrical power); Load shifting; Management system; Reliability engineering; Environmental economics; Power (physics); Operations management; Electricity; Business; Engineering; Economics","score_opus":0.00864113850204164,"score_gpt":0.23333170868172254,"score_spread":0.2246905701796809,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2742926814","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017049706,0.0021165959,0.9800771,0.00007303326,0.00047047038,0.0001438527,8.274267e-7,0.0000150424285,0.000053403128],"genre_scores_gemma":[0.9319658,0.0001785534,0.067596115,0.0000065300924,0.00020757265,0.0000042713773,7.814053e-7,0.00001700224,0.000023344008],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99947375,0.000009716972,0.00018097393,0.00009116898,0.00004925138,0.00019514441],"domain_scores_gemma":[0.9994814,0.000031095224,0.00005415563,0.000072924224,0.000049044058,0.00031142755],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002190155,0.00010060812,0.00016193907,0.00016048974,0.0001230315,0.00015173301,0.00007686808,0.0000536717,7.2048965e-7],"category_scores_gemma":[0.00003039791,0.00009800274,0.000021609152,0.000048701168,0.000012821669,0.00013567372,0.000010376932,0.00011539719,5.1057384e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000137020525,0.0000039373153,0.0008651275,0.00018165402,0.000113939495,0.00002919646,0.00014425389,0.013649624,0.00078064785,0.00039654688,0.0008694969,0.9829519],"study_design_scores_gemma":[0.00046211964,0.00011229073,0.004376266,0.000086238186,0.000030428804,0.00034308044,0.0000020702153,0.9855499,0.0004687668,0.00007859044,0.008351854,0.00013834746],"about_ca_topic_score_codex":0.00018248922,"about_ca_topic_score_gemma":0.00004885812,"teacher_disagreement_score":0.98281354,"about_ca_system_score_codex":0.00010342658,"about_ca_system_score_gemma":0.000038615068,"threshold_uncertainty_score":0.39964357},"labels":[],"label_agreement":null},{"id":"W2749339364","doi":"10.37798/2008572321","title":"PROFITABILITY OF INCENTIVE PURCHASE PRICES FOR WIND FARM PROJECTS IN CROATIA","year":2022,"lang":"en","type":"article","venue":"Journal of Energy - Energija","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Physics; Humanities; Agricultural science; Environmental science; Art","score_opus":0.009383884865465953,"score_gpt":0.21622568857825775,"score_spread":0.2068418037127918,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2749339364","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9524781,0.0025865664,0.042539343,0.00006201422,0.00077378645,0.00028564365,0.000023077444,0.0000327497,0.0012186805],"genre_scores_gemma":[0.99734396,0.000057612204,0.0023370576,0.000012762246,0.000077343495,0.000040382147,0.000007674717,0.00002777699,0.000095451425],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99856997,0.00008782144,0.0006936884,0.00011905008,0.0003146104,0.00021487668],"domain_scores_gemma":[0.9991416,0.0001019837,0.00038561347,0.00014085615,0.00018036782,0.000049609476],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061766955,0.00012823031,0.0003236692,0.0003791218,0.00004660014,0.0000111721865,0.00023833409,0.00005023636,0.000014493432],"category_scores_gemma":[0.00009630487,0.00012466658,0.00010636612,0.0005986677,0.000018183482,0.00017106479,0.000044294397,0.00016628274,6.42714e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017543051,0.00019619602,0.0013431506,0.00009833901,0.0000927087,0.000013376726,0.00083887466,0.98054737,0.012595178,0.0015316311,0.00033262325,0.00223512],"study_design_scores_gemma":[0.013787656,0.005250067,0.011506534,0.00035568347,0.0002760247,0.00030830796,0.0031873186,0.6480905,0.26693365,0.0030976548,0.04557281,0.0016338179],"about_ca_topic_score_codex":0.000078190504,"about_ca_topic_score_gemma":0.000040361,"teacher_disagreement_score":0.33245692,"about_ca_system_score_codex":0.0003565407,"about_ca_system_score_gemma":0.00014335911,"threshold_uncertainty_score":0.5083755},"labels":[],"label_agreement":null},{"id":"W2751050958","doi":"10.1109/tpwrs.2017.2749303","title":"Security-Constrained Unit Commitment for AC-DC Grids With Generation and Load Uncertainty","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Power system simulation; Mathematical optimization; Iterative method; Computer science; Electric power system; Mathematics; Power (physics)","score_opus":0.016984519759478053,"score_gpt":0.2313541862627911,"score_spread":0.21436966650331307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2751050958","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026122315,0.00017141657,0.9677903,0.00009094352,0.0022942286,0.0012603097,0.00013016278,0.0002726303,0.0018676956],"genre_scores_gemma":[0.9987138,0.000037524438,0.00030507418,0.00001499703,0.000046433015,0.00038153352,0.000013498224,0.000053388198,0.0004337548],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988381,0.000047364054,0.00030928268,0.00027548833,0.00024683398,0.00028287506],"domain_scores_gemma":[0.9990104,0.0000606064,0.00010449838,0.0005470465,0.0001650492,0.00011239303],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027492616,0.00025563347,0.0002850543,0.000115666095,0.00052289857,0.00029331498,0.0001682547,0.00014278312,0.0000106424095],"category_scores_gemma":[0.0000054291245,0.00023331119,0.00005445029,0.00008879802,0.00006439827,0.0002945882,8.2961037e-7,0.00016068575,0.000008150894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000116682895,0.000121748126,0.000069305315,0.00037443766,0.00048891944,0.000008918956,0.0014371047,0.9901882,0.0038759813,0.00077886076,0.0015125282,0.0010273062],"study_design_scores_gemma":[0.0031766552,0.00068960356,0.00005859473,0.00028537112,0.00015825997,0.00011587225,0.00031181576,0.9752507,0.011262012,0.000016450385,0.007994044,0.00068057585],"about_ca_topic_score_codex":0.00014685025,"about_ca_topic_score_gemma":0.00030508937,"teacher_disagreement_score":0.97259146,"about_ca_system_score_codex":0.00022364891,"about_ca_system_score_gemma":0.00006388668,"threshold_uncertainty_score":0.9514155},"labels":[],"label_agreement":null},{"id":"W2751099879","doi":"10.2139/ssrn.3027705","title":"Optimal Procurement of Distributed Energy Resources","year":2017,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund; Government of Canada","keywords":"Procurement; Order (exchange); Electricity; Environmental economics; Distributed generation; Business; Distribution (mathematics); Industrial organization; Risk analysis (engineering); Microeconomics; Computer science; Operations research; Economics; Finance; Engineering; Renewable energy; Marketing","score_opus":0.006458869113208802,"score_gpt":0.21004139781942896,"score_spread":0.20358252870622015,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2751099879","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036365326,0.03255466,0.9263069,0.00014773611,0.0013390875,0.00033074548,0.000060206792,0.00026474436,0.0026305823],"genre_scores_gemma":[0.98709404,0.01132662,0.00049171026,0.00000291128,0.0004249288,0.000029274499,0.00008236783,0.00008678594,0.00046132968],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9965473,0.000080287544,0.0006887876,0.00027372641,0.0005047677,0.0019051611],"domain_scores_gemma":[0.9984466,0.000022618695,0.00063075416,0.00058438117,0.00021764469,0.0000979893],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0011276948,0.0003809046,0.000546414,0.00024759653,0.00015066993,0.00013884048,0.0009424641,0.0003564047,0.000012110498],"category_scores_gemma":[0.00007068981,0.00037847206,0.00022496517,0.00010839757,0.000040884515,0.000119629796,0.00017658525,0.002634502,0.0000030270676],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006582911,0.000083153456,0.00028322366,0.00032410005,0.0017677959,0.00001065154,0.00031652622,0.9750565,0.00048058174,0.009476866,0.001539988,0.010594739],"study_design_scores_gemma":[0.0068259705,0.0023650373,0.0009305941,0.0045618983,0.0020297621,0.0027913153,0.0014225706,0.699876,0.020216204,0.18363611,0.0691069,0.0062376265],"about_ca_topic_score_codex":0.00007866528,"about_ca_topic_score_gemma":0.00018093514,"teacher_disagreement_score":0.9507288,"about_ca_system_score_codex":0.0019496053,"about_ca_system_score_gemma":0.0014881825,"threshold_uncertainty_score":0.9998667},"labels":[],"label_agreement":null},{"id":"W2755126874","doi":"10.15173/esr.v23i1.3311","title":"On the Impact of Wind Feed-in and Interconnections on Electricity Price in Germany","year":2017,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Spot contract; Electricity; Volatility (finance); Electricity market; Wind power; Economics; Electricity price; Electricity generation; Business; Monetary economics; Econometrics; Power (physics); Financial economics; Electrical engineering; Engineering","score_opus":0.022547213336629526,"score_gpt":0.2972966655673509,"score_spread":0.2747494522307214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2755126874","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40066254,0.5381896,0.00072448933,0.0010947287,0.000403415,0.00088814535,0.0000050877507,0.00009750697,0.05793448],"genre_scores_gemma":[0.85143036,0.14842333,0.000005407316,0.000046233123,0.000011729675,0.000026104024,2.8292658e-7,0.000008837633,0.000047695936],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9993873,0.000068395304,0.00023242473,0.00010907266,0.00006696322,0.00013583052],"domain_scores_gemma":[0.9993846,0.00021351685,0.00008695996,0.00027436382,0.000026094081,0.000014459376],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028100176,0.00011502803,0.00031877295,0.00008595744,0.00006691985,0.000010406294,0.00012236017,0.00002516554,0.000006857461],"category_scores_gemma":[0.00044273218,0.000073516145,0.00004743669,0.00021188303,0.000021272137,0.000058835565,0.00002764387,0.00010338887,0.00000196339],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018456022,0.001216457,0.019644285,0.0147846695,0.0050139837,0.00011120269,0.007019109,0.48125172,0.0017010145,0.104656406,0.09405079,0.2703658],"study_design_scores_gemma":[0.0052762018,0.0037206933,0.7036709,0.083028466,0.00037390616,0.00011468633,0.00036024713,0.16306591,0.00417926,0.004144632,0.028510477,0.0035546257],"about_ca_topic_score_codex":0.00015478549,"about_ca_topic_score_gemma":0.00018184332,"teacher_disagreement_score":0.6840266,"about_ca_system_score_codex":0.00016955397,"about_ca_system_score_gemma":0.000008368459,"threshold_uncertainty_score":0.2997901},"labels":[],"label_agreement":null},{"id":"W2762453449","doi":"10.1109/tste.2017.2761179","title":"Stochastic Operation Framework for Distribution Networks Hosting High Wind Penetrations","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Stochastic programming; Mathematical optimization; Wind power; Control reconfiguration; Computer science; Linear programming; Integer programming; Conic section; Stochastic optimization; Electric power system; Operations research; Power (physics); Reliability engineering; Engineering; Mathematics; Electrical engineering","score_opus":0.00704614382327904,"score_gpt":0.22094458083656762,"score_spread":0.2138984370132886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2762453449","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013546182,0.00008378393,0.99618196,0.00011130849,0.0012193767,0.00040977693,0.000039090017,0.00032610804,0.00027394455],"genre_scores_gemma":[0.99547374,0.00003933558,0.0024055815,0.000023143992,0.00024597425,0.00029879034,0.000103662256,0.00006662037,0.0013431481],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987043,0.000028305576,0.0003066722,0.0002778606,0.00016528057,0.0005175935],"domain_scores_gemma":[0.9988503,0.00019550356,0.00009886642,0.00052438345,0.00023244933,0.00009851265],"candidate_categories":["metaepi_narrow","sts"],"consensus_categories":[],"category_scores_codex":[0.00017692639,0.00023124412,0.00020441043,0.00012287374,0.0015955253,0.00039958858,0.00023458671,0.00024722648,0.00003079096],"category_scores_gemma":[0.00006560166,0.0002667308,0.000086006956,0.00019641574,0.000035695826,0.0006157472,0.0000016119604,0.00022227503,0.0000036828503],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021938666,0.000033744927,0.0000011693425,0.000033536806,0.000046301502,0.0000025215866,0.000037774265,0.9702133,0.000058353515,0.025957836,0.00023807886,0.0033554465],"study_design_scores_gemma":[0.00048021704,0.00012212057,0.000060581275,0.000059822632,0.000069422764,0.000005890804,0.00013027007,0.9929947,0.0033118047,0.0017737997,0.00066214136,0.0003292279],"about_ca_topic_score_codex":0.00021946005,"about_ca_topic_score_gemma":0.0000727078,"teacher_disagreement_score":0.9941191,"about_ca_system_score_codex":0.00045026295,"about_ca_system_score_gemma":0.00006898384,"threshold_uncertainty_score":0.9999785},"labels":[],"label_agreement":null},{"id":"W2764592786","doi":"10.1109/tpwrs.2003.821473","title":"An Investigation on the Reactive Power Support Service Needs of Power Producers","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"AC power; Electric power system; Generator (circuit theory); Power (physics); Compensation (psychology); Profit (economics); Volt-ampere reactive; Computer science; Power-flow study; Service (business); Electrical engineering; Engineering; Business; Voltage; Economics; Microeconomics; Marketing; Physics","score_opus":0.01257743117357926,"score_gpt":0.2048939229711233,"score_spread":0.19231649179754404,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2764592786","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.398274,0.00006466223,0.58169574,0.0006618083,0.005658691,0.002042437,0.00009694139,0.0008538638,0.010651854],"genre_scores_gemma":[0.9992245,0.0000068726104,0.000074432886,0.0001946418,0.000018315632,0.0001753323,0.0000108715485,0.00010839052,0.00018668169],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9979461,0.00015939154,0.0006397149,0.00031500592,0.0005537687,0.0003860264],"domain_scores_gemma":[0.998342,0.00010384459,0.00017596794,0.0009306609,0.00028742212,0.00016012586],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005045048,0.00037083577,0.00035976229,0.000499002,0.00015191428,0.00007784941,0.0003498158,0.00022886792,0.00008287139],"category_scores_gemma":[0.000008442662,0.0003109468,0.00011126047,0.001446821,0.00005298642,0.00049362076,9.1446327e-7,0.00041769835,0.00015912877],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006597916,0.00020230064,0.0000187747,0.00009614736,0.00022152247,0.0000038421917,0.014454889,0.95462227,0.028625172,0.0010517004,0.00060611096,0.00003130269],"study_design_scores_gemma":[0.0041884896,0.005013281,0.0007888591,0.001719997,0.00037985618,0.00031884885,0.020825336,0.03317516,0.926991,0.00020058657,0.0036382806,0.0027602983],"about_ca_topic_score_codex":0.00021779018,"about_ca_topic_score_gemma":0.00002936114,"teacher_disagreement_score":0.9214471,"about_ca_system_score_codex":0.0004724883,"about_ca_system_score_gemma":0.0001460705,"threshold_uncertainty_score":0.99993426},"labels":[],"label_agreement":null},{"id":"W2765000871","doi":"10.1109/tpwrs.2006.888986","title":"Formulation of Oligopolistic Competition in AC Power Networks: An NLP Approach","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Oligopoly; Node (physics); Competition (biology); Electric power system; Computer science; Operator (biology); Set (abstract data type); Market power; AC power; Nonlinear system; Mathematical optimization; Power (physics); Voltage; Operations research; Economics; Engineering; Mathematical economics; Mathematics; Microeconomics; Cournot competition; Electrical engineering","score_opus":0.009325294611882992,"score_gpt":0.21849887598709805,"score_spread":0.20917358137521505,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2765000871","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023168854,0.00016689648,0.9658328,0.000002165536,0.002155686,0.0006434018,0.000017354118,0.00029565484,0.007717154],"genre_scores_gemma":[0.99917567,0.000016862765,0.0005653691,0.000007797675,0.000023974648,0.00004844913,0.000024159506,0.00006599891,0.0000717079],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99815595,0.000086817905,0.00077865965,0.00025741034,0.00031742838,0.0004037601],"domain_scores_gemma":[0.9991935,0.000093883595,0.00011365438,0.00038862485,0.000099446625,0.00011089355],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006213806,0.00024365382,0.0003524667,0.0006103664,0.000061325925,0.00003817791,0.00015529401,0.00024531927,0.000021720867],"category_scores_gemma":[0.0000034817172,0.00026711676,0.000078940466,0.000840499,0.000021603695,0.0003987614,5.6893646e-7,0.00026215898,0.000012108425],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037716956,0.00017319877,0.00006515048,0.00009940472,0.000035217534,0.0000025745417,0.0005874193,0.9968378,0.0006922085,0.001323674,0.000031301053,0.00011432024],"study_design_scores_gemma":[0.000762335,0.00022124186,0.0009963276,0.00019179912,0.000028026177,0.000040145937,0.0004392468,0.994753,0.0020235449,0.00001283273,0.00016616195,0.00036535188],"about_ca_topic_score_codex":0.00012396275,"about_ca_topic_score_gemma":0.000076163466,"teacher_disagreement_score":0.9760068,"about_ca_system_score_codex":0.00033678798,"about_ca_system_score_gemma":0.000019639676,"threshold_uncertainty_score":0.9999781},"labels":[],"label_agreement":null},{"id":"W2766571422","doi":"10.1109/tpwrs.2017.2764420","title":"Power System Operational Adequacy Evaluation With Wind Power Ramp Limits","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Control theory (sociology); Range (aeronautics); Power (physics); Limit (mathematics); Engineering; Computer science; Reliability engineering; Mathematics; Electrical engineering","score_opus":0.014961855964609782,"score_gpt":0.2344076795999113,"score_spread":0.21944582363530152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2766571422","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022088619,0.00039098537,0.91464204,0.00009607593,0.0086510405,0.0021492683,0.00009367052,0.00087031355,0.05101799],"genre_scores_gemma":[0.9977463,0.000011460812,0.00025973725,0.000024342442,0.000050058257,0.00034969184,0.00001627656,0.00016211395,0.0013800259],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9965113,0.0002272983,0.0007609893,0.0006120533,0.001302865,0.0005854917],"domain_scores_gemma":[0.9973623,0.00010907663,0.00026900898,0.0014488413,0.00057326216,0.00023749005],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009152075,0.00054322794,0.00055872306,0.00039330343,0.0008816411,0.0007838703,0.00055517943,0.0003359828,0.00026523304],"category_scores_gemma":[0.000021145548,0.00049923593,0.00015395787,0.00030232748,0.00007133185,0.0011364982,0.0000019692968,0.0004377982,0.00050079514],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010810534,0.00014458253,0.00007605789,0.00017855882,0.00050964084,0.000026501197,0.0010192835,0.993331,0.0018555829,0.0007873474,0.0017753802,0.00018796035],"study_design_scores_gemma":[0.008185768,0.0016239678,0.0021337,0.0027714497,0.0005877432,0.0010209903,0.0018705346,0.94950634,0.01751905,0.0000070076676,0.011698926,0.0030745144],"about_ca_topic_score_codex":0.00006665608,"about_ca_topic_score_gemma":0.000024730167,"teacher_disagreement_score":0.9756577,"about_ca_system_score_codex":0.0008573861,"about_ca_system_score_gemma":0.0002024226,"threshold_uncertainty_score":0.9997459},"labels":[],"label_agreement":null},{"id":"W2770372302","doi":"10.1109/tpwrs.2017.2772044","title":"Management of Cascading Outage Risk Based on Risk Gradient and Markovian Tree Search","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cascading failure; Electric power system; Risk management; Computer science; Convergence (economics); Reliability engineering; Mathematical optimization; Linearization; Reduction (mathematics); Tree (set theory); Power (physics); Engineering; Mathematics; Nonlinear system","score_opus":0.008883866816628784,"score_gpt":0.21723417960548583,"score_spread":0.20835031278885704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2770372302","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050405167,0.00014137893,0.9339434,0.00001619848,0.0021868313,0.00075984007,0.00013645625,0.00019346875,0.01221728],"genre_scores_gemma":[0.99863374,0.00023424784,0.00041065874,0.000002739168,0.000010546939,0.00007759067,0.0000017917732,0.000062561034,0.0005661065],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983919,0.00014534347,0.00040907387,0.00032813026,0.00039110344,0.00033443238],"domain_scores_gemma":[0.9986549,0.00009778397,0.00016826119,0.00089888944,0.000048136604,0.00013199821],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005890586,0.00025579226,0.00032334749,0.00035560867,0.00040997076,0.00013924832,0.0002609004,0.00012036702,0.000015897622],"category_scores_gemma":[0.000004565132,0.0002541108,0.00010694614,0.0001563289,0.000046026016,0.00015740714,0.000001822413,0.00030599453,0.000023712017],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007547113,0.0001220939,0.0009872838,0.00054778665,0.0003882224,0.000039318827,0.0005952332,0.9902343,0.00013637276,0.00008255438,0.00015371438,0.006637607],"study_design_scores_gemma":[0.0014640568,0.00033329704,0.004955683,0.0007075357,0.00018557507,0.000013520482,0.00028600078,0.9876365,0.0035243577,0.0000032137675,0.0004877547,0.00040248063],"about_ca_topic_score_codex":0.0003777337,"about_ca_topic_score_gemma":0.00005118977,"teacher_disagreement_score":0.9482286,"about_ca_system_score_codex":0.00019549472,"about_ca_system_score_gemma":0.00001091453,"threshold_uncertainty_score":0.9999911},"labels":[],"label_agreement":null},{"id":"W2774447441","doi":"10.1109/jsyst.2017.2775610","title":"A Branch-and-Cut Benders Decomposition Algorithm for Transmission Expansion Planning","year":2017,"lang":"en","type":"article","venue":"IEEE Systems Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Solver; Benchmark (surveying); Benders' decomposition; Mathematical optimization; Decomposition; Acceleration; Integer programming; Computer science; Key (lock); Transmission (telecommunications); Linear programming; Branch and cut; Algorithm; Mathematics","score_opus":0.017183723743612853,"score_gpt":0.27509051828375536,"score_spread":0.2579067945401425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2774447441","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023753999,0.0020216636,0.9705327,0.00003688655,0.0027843772,0.00034075906,0.000005739739,0.000109389366,0.00041445758],"genre_scores_gemma":[0.99315226,0.00014133358,0.005925088,0.00000593667,0.0006213306,0.0000255979,0.0000046341393,0.000047006648,0.000076788696],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989659,0.000042992724,0.00037024464,0.0001417197,0.00020443667,0.00027469502],"domain_scores_gemma":[0.9993635,0.000043647873,0.00018268835,0.00017678177,0.000081936414,0.00015146892],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004256879,0.00016189391,0.00024003438,0.00014225519,0.0006705561,0.00039574818,0.00016482863,0.00012899449,0.0000021031033],"category_scores_gemma":[0.000010514915,0.00015157381,0.000072403716,0.000035704456,0.000014201025,0.0004892226,0.00000485625,0.00019180389,0.0000025499437],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046928402,0.00003224709,0.00033521117,0.00059684576,0.00024716023,0.000056278703,0.001925912,0.6927625,0.054131337,0.000025952217,0.0064363107,0.24340335],"study_design_scores_gemma":[0.0011895125,0.000094545794,0.00028666205,0.0008242929,0.000038667557,0.0011131982,0.000051025403,0.99048233,0.0040886444,0.00006195232,0.0015342204,0.00023497529],"about_ca_topic_score_codex":0.000010992303,"about_ca_topic_score_gemma":7.6882475e-7,"teacher_disagreement_score":0.96939826,"about_ca_system_score_codex":0.00011499998,"about_ca_system_score_gemma":0.00002468473,"threshold_uncertainty_score":0.61810005},"labels":[],"label_agreement":null},{"id":"W2785415183","doi":"10.1109/pesgm.2017.8274600","title":"Optimal scheduling of energy storage to mitigate power quality issues in power systems","year":2017,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"York University","funders":"","keywords":"Profitability index; Energy storage; Arbitrage; Computer science; Profit (economics); Linear programming; Electric power system; Scheduling (production processes); Renewable energy; Grid; Mathematical optimization; Integer programming; Electricity; Profit maximization; Peaking power plant; Reliability engineering; Environmental economics; Distributed generation; Power (physics); Engineering; Economics; Electrical engineering; Finance; Microeconomics; Mathematics","score_opus":0.012445796722951053,"score_gpt":0.2661964663471483,"score_spread":0.25375066962419723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2785415183","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.688597,0.00083208136,0.27829695,0.00010225067,0.0009753725,0.00023957081,0.00000812852,0.00022414581,0.030724475],"genre_scores_gemma":[0.9946872,0.000017211407,0.0041997773,0.00001206763,0.000021973361,0.000020692194,0.000002843322,0.000036928548,0.0010013068],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99871206,0.000060305763,0.00049840455,0.000207852,0.00022764177,0.00029375713],"domain_scores_gemma":[0.9990322,0.000037078073,0.000108581524,0.000638322,0.00008926288,0.000094563715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004814125,0.00016696732,0.0003611307,0.00017911162,0.00005299888,0.00010674517,0.0003347191,0.000115467774,0.000050243267],"category_scores_gemma":[0.00013198813,0.00016992912,0.00004680791,0.00014014027,0.00001825856,0.00028717707,0.00005697626,0.00008683367,0.00002003441],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011760766,0.000023428587,0.0021829342,0.00008156076,0.00003714816,0.000008314727,0.00047215616,0.98444825,0.006485892,0.0057678,0.00043580952,0.000044968107],"study_design_scores_gemma":[0.0016832304,0.0002609658,0.02491922,0.000848426,0.000021903612,0.0000168404,0.0009337099,0.91418046,0.048597757,0.00004034344,0.0070163985,0.0014807477],"about_ca_topic_score_codex":0.0010263184,"about_ca_topic_score_gemma":0.00008229175,"teacher_disagreement_score":0.30609018,"about_ca_system_score_codex":0.00010950053,"about_ca_system_score_gemma":0.000019708345,"threshold_uncertainty_score":0.6929508},"labels":[],"label_agreement":null},{"id":"W2786490471","doi":"10.1109/epec.2017.8286188","title":"A linear programing model for coordinated low-carbon generation and transmission expansion planning","year":2017,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Renewable energy; MATLAB; Linear programming; Electricity generation; Carbon fibers; Computer science; Reduction (mathematics); Transmission (telecommunications); Mathematical optimization; Energy (signal processing); Electric power system; Process (computing); Transmission system; Power (physics); Engineering; Algorithm; Telecommunications; Electrical engineering; Mathematics","score_opus":0.027991868269686467,"score_gpt":0.26291053872692166,"score_spread":0.2349186704572352,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2786490471","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19627433,0.00017879416,0.8022665,0.000030177993,0.00008299161,0.00038728828,7.7673843e-7,0.00023396692,0.00054519466],"genre_scores_gemma":[0.9650077,0.000021333524,0.034571663,0.0000053794347,0.000059081398,0.00005677119,0.000022389024,0.000032295397,0.00022334646],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994492,0.0000068155027,0.00015684978,0.00015189455,0.0000712488,0.00016397452],"domain_scores_gemma":[0.9996937,0.000011295692,0.000038695343,0.00016047481,0.000045288998,0.00005057069],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001276358,0.00010957825,0.00011555079,0.00005783185,0.00019879681,0.00009551077,0.000069106856,0.00009512616,7.962704e-7],"category_scores_gemma":[0.000020806,0.000102804144,0.000019762318,0.000033556775,0.0000084567,0.00020174653,0.000008612682,0.000053952448,2.422785e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014770764,0.000013081562,0.00018001004,0.00015605286,0.000015882606,0.00000108038,0.0005373894,0.8617787,0.10616726,0.00005312422,0.00012872051,0.030953955],"study_design_scores_gemma":[0.00045178778,0.00003163561,0.000048034,0.00007766943,0.000011716337,0.0000020789237,0.0000074003947,0.98085636,0.018326446,0.00001763507,0.000040214956,0.00012902061],"about_ca_topic_score_codex":0.0000074769455,"about_ca_topic_score_gemma":0.0000026799075,"teacher_disagreement_score":0.76873344,"about_ca_system_score_codex":0.000028537039,"about_ca_system_score_gemma":0.000011030273,"threshold_uncertainty_score":0.41922313},"labels":[],"label_agreement":null},{"id":"W2787262780","doi":"10.1109/pesgm.2017.8274735","title":"Autoregressive moving average modeling of area control error","year":2017,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Autoregressive–moving-average model; Autoregressive model; Moving average; Computer science; Wind power; Time series; Automatic Generation Control; Series (stratigraphy); Power (physics); Electric power system; Control (management); Control theory (sociology); Econometrics; Mathematics; Engineering; Artificial intelligence; Machine learning","score_opus":0.01425240844530584,"score_gpt":0.22206702263643904,"score_spread":0.2078146141911332,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2787262780","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030504074,0.000143891,0.92521507,0.000023312388,0.00026205616,0.00013612636,0.0000035792784,0.00019134818,0.043520562],"genre_scores_gemma":[0.9979454,0.0000075401604,0.0016866846,0.0000072040766,0.000030513827,0.000008300007,0.0000015265507,0.000021235861,0.00029156663],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99944454,0.0000087644385,0.00019148225,0.00009330613,0.0001096068,0.00015229668],"domain_scores_gemma":[0.99944776,0.000021558675,0.00007411992,0.00035941746,0.00006104985,0.00003609817],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009461284,0.00009262226,0.00017043077,0.000054446617,0.00008207018,0.00004279141,0.00019687494,0.00005809284,0.000039987142],"category_scores_gemma":[0.00007902829,0.00008537237,0.00003893785,0.000021039406,0.0000099668605,0.00021499456,0.00001615932,0.00006434353,0.00000726107],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002700965,0.0000035097162,0.00047239682,0.00002765486,0.000030681178,0.0000026916152,0.0000993794,0.99740034,0.0012774027,0.00022972349,0.00010868873,0.00034485167],"study_design_scores_gemma":[0.00036887327,0.000007958487,0.0001517312,0.000049733,0.000009649715,0.0000023437174,0.000009797027,0.99789596,0.0013554178,0.000042680862,0.000014158903,0.0000917022],"about_ca_topic_score_codex":0.000045457375,"about_ca_topic_score_gemma":0.000011940006,"teacher_disagreement_score":0.9674414,"about_ca_system_score_codex":0.000041390373,"about_ca_system_score_gemma":0.000012986566,"threshold_uncertainty_score":0.34813842},"labels":[],"label_agreement":null},{"id":"W2787411904","doi":"10.22109/jemt.2017.46746","title":"A Risk-based Two-stage Stochastic Optimal Power Flow Considering the Impact of Multiple Operational Uncertainties","year":2017,"lang":"en","type":"article","venue":"Journal of Energy Management and Technology","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"CVAR; Expected shortfall; Stochastic programming; Electricity market; Procurement; Wind power; Electric power system; Mathematical optimization; Electricity; Reliability engineering; Electricity generation; Computer science; AC power; Risk management; Operations research; Engineering; Economics; Power (physics); Mathematics; Finance","score_opus":0.0068710864479442635,"score_gpt":0.22521368846407816,"score_spread":0.2183426020161339,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2787411904","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34583023,0.00074025977,0.6522296,0.00018420986,0.00021733298,0.00009490568,0.0000055089113,0.00004722544,0.0006507115],"genre_scores_gemma":[0.9933068,0.00007940594,0.0064950814,0.000004042445,0.000020967389,0.0000056460785,0.0000010298721,0.00001280024,0.00007422543],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937534,0.000017995308,0.00027847048,0.00007154367,0.0001167572,0.00013990198],"domain_scores_gemma":[0.99930245,0.000057109755,0.0002866593,0.00023040848,0.00010012454,0.00002324086],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020334398,0.00011035222,0.00019182118,0.00033782652,0.00014880951,0.00005722514,0.0002534285,0.000057547288,0.00001748096],"category_scores_gemma":[0.00009802933,0.0000766969,0.000060476883,0.00010240363,0.000100657424,0.00012976516,0.000058163616,0.00013107543,2.7899816e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021296823,0.000014346041,0.0036392584,0.0000110371275,0.00029811732,0.000013583927,0.000020752052,0.991353,0.00020641419,0.003065858,0.0001943212,0.0011620248],"study_design_scores_gemma":[0.0011784192,0.00018365121,0.0022501359,0.00005463004,0.00005409889,0.000024966932,0.00007109481,0.99474347,0.00082204567,0.00028732693,0.00022873962,0.00010139741],"about_ca_topic_score_codex":0.00003962524,"about_ca_topic_score_gemma":0.000021842097,"teacher_disagreement_score":0.64747655,"about_ca_system_score_codex":0.000050023325,"about_ca_system_score_gemma":0.000022446575,"threshold_uncertainty_score":0.3127609},"labels":[],"label_agreement":null},{"id":"W2787636654","doi":"10.1109/pesgm.2017.8274023","title":"Investigation of Ontario's electricity market behaviour and energy storage scheduling in the market based on model predictive control","year":2017,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University","funders":"","keywords":"Electricity market; Energy storage; Arbitrage; Model predictive control; Electricity; Renewable energy; Profit (economics); Computer science; Scheduling (production processes); Software deployment; Operations research; Microeconomics; Business; Economics; Control (management); Engineering; Operations management; Finance; Electrical engineering","score_opus":0.008131479506227236,"score_gpt":0.18721532500333612,"score_spread":0.1790838454971089,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2787636654","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34840813,0.00003402353,0.6177723,0.00007504676,0.00006680417,0.00026282814,0.000010401219,0.00006455175,0.033305895],"genre_scores_gemma":[0.9974033,0.000006098508,0.0021568553,0.00007296044,0.000011846004,0.000043633303,0.0000038941107,0.000015988397,0.0002854115],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991671,0.00009280065,0.00022008935,0.00015430467,0.00020061564,0.000165086],"domain_scores_gemma":[0.9993538,0.00013864753,0.00010046508,0.00032311812,0.000045902332,0.000038045284],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005890784,0.00013078994,0.00017282179,0.0001336097,0.00008505665,0.000055157812,0.00018692591,0.0000944596,0.0000217393],"category_scores_gemma":[0.00009799841,0.00010812797,0.000025420542,0.00008622957,0.0000275443,0.00019249422,0.000009158894,0.00015958225,1.2115711e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000091138216,0.00001717317,0.06288463,0.00002094054,0.00001718781,0.0000023283026,0.00031026677,0.9355018,0.00034010332,0.00022025201,0.00045367508,0.0001404891],"study_design_scores_gemma":[0.0007197335,0.000061064355,0.10530743,0.000035983256,0.000019855399,0.000001037507,0.000008487281,0.89284724,0.00080988946,0.00009666673,0.0000026814832,0.00008994968],"about_ca_topic_score_codex":0.004255599,"about_ca_topic_score_gemma":0.0070523894,"teacher_disagreement_score":0.64899516,"about_ca_system_score_codex":0.0002550146,"about_ca_system_score_gemma":0.00011183359,"threshold_uncertainty_score":0.6433221},"labels":[],"label_agreement":null},{"id":"W2787871984","doi":"10.1109/epec.2017.8286205","title":"A novel multiple fuels' cost function for realistic economic load dispatch needs","year":2017,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Function (biology); Computer science; Mathematical optimization; Polynomial; Mathematics","score_opus":0.017962004998650194,"score_gpt":0.22777222025174282,"score_spread":0.20981021525309262,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2787871984","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007175669,0.000030372506,0.96536887,0.000053277203,0.0012939138,0.00054307166,0.00004059884,0.00029014336,0.025204103],"genre_scores_gemma":[0.99533916,0.0000124209555,0.002654782,0.000014020467,0.0001782192,0.00014895583,0.000032643686,0.00004081377,0.0015790022],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993888,0.0000035365047,0.00018737446,0.00012993424,0.00007441718,0.00021594713],"domain_scores_gemma":[0.999343,0.000068592046,0.00006179744,0.00040689306,0.000061716935,0.000058013702],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016509344,0.00012191744,0.00014117816,0.00006241713,0.00015696017,0.00013436815,0.00016599153,0.000079570294,0.0000367618],"category_scores_gemma":[0.00012880997,0.00012565815,0.000046911606,0.000030261323,0.0000116740985,0.0002535241,0.000017766988,0.000048497095,0.000068808375],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002430762,0.00011873779,0.023276996,0.0006240736,0.0004139533,9.837674e-7,0.0005067869,0.8434146,0.02867242,0.011493895,0.05554992,0.03568455],"study_design_scores_gemma":[0.0010997717,0.00003754301,0.007197275,0.000016074988,0.000029885672,0.0000038088547,0.00001995765,0.981906,0.00081843283,0.000052275278,0.008617311,0.00020165715],"about_ca_topic_score_codex":0.0006847876,"about_ca_topic_score_gemma":0.0014480179,"teacher_disagreement_score":0.9881635,"about_ca_system_score_codex":0.00041810403,"about_ca_system_score_gemma":0.000043947955,"threshold_uncertainty_score":0.51241904},"labels":[],"label_agreement":null},{"id":"W2790780473","doi":"10.1109/tpwrs.2018.2805322","title":"An Incentive-Based Multistage Expansion Planning Model for Smart Distribution Systems","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"King Saud University","keywords":"Incentive; Distributed generation; Software deployment; Profit (economics); Payback period; Bidding; Linearization; Electric power system; Investment (military); Operations research; Computer science; Environmental economics; Business; Finance; Economics; Microeconomics; Renewable energy; Engineering; Power (physics); Electrical engineering","score_opus":0.01739433024462106,"score_gpt":0.25074176357628625,"score_spread":0.2333474333316652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2790780473","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011674029,0.00016551733,0.9790483,0.0000055496857,0.0057445504,0.0014925032,0.00064362795,0.001016948,0.00020893438],"genre_scores_gemma":[0.99809456,0.000004082718,0.0006922362,0.000011720662,0.00005446141,0.00058927905,0.00014699427,0.000113077615,0.0002935769],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979379,0.000115136856,0.0006149265,0.0004522882,0.00036303574,0.00051671936],"domain_scores_gemma":[0.9987369,0.0000985976,0.000120712095,0.0005673485,0.00029293622,0.0001835004],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00038701174,0.00035903012,0.00037737566,0.0002465742,0.0003682281,0.00019159038,0.00022586892,0.00027275004,0.0000063175235],"category_scores_gemma":[0.000005698371,0.00038013706,0.000116789946,0.00038458584,0.00004559191,0.0004378483,5.706426e-7,0.00019779585,0.000037777496],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008675435,0.00010979047,0.000017669423,0.00020384276,0.00005497958,0.000002128259,0.0004892349,0.9930778,0.005035472,0.000077699515,0.0007656461,0.000078993224],"study_design_scores_gemma":[0.00090004597,0.00036053994,0.00001435387,0.00034292377,0.0000449346,0.00000803134,0.00016670619,0.98885286,0.007986071,0.0000016278457,0.0009212316,0.0004006981],"about_ca_topic_score_codex":0.00008324592,"about_ca_topic_score_gemma":0.000015019685,"teacher_disagreement_score":0.9864206,"about_ca_system_score_codex":0.0005456717,"about_ca_system_score_gemma":0.000068563495,"threshold_uncertainty_score":0.99986506},"labels":[],"label_agreement":null},{"id":"W2792211322","doi":"10.1016/j.renene.2018.02.059","title":"GHG-mitigation oriented and coal-consumption constrained inexact robust model for regional energy structure adjustment – A case study for Jiangsu Province, China","year":2018,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"National Natural Science Foundation of China","keywords":"Coal; Greenhouse gas; Stochastic programming; Renewable energy; Environmental economics; Consumption (sociology); Energy consumption; Wind power; Electricity; Environmental science; Electricity generation; Investment (military); Natural resource economics; Economics; Power (physics); Engineering; Mathematical optimization; Waste management; Mathematics","score_opus":0.012970330250265004,"score_gpt":0.22075631681819743,"score_spread":0.20778598656793243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2792211322","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07472693,0.00035082886,0.92342573,0.000017456694,0.00028951577,0.0007195809,0.00009238431,0.00022344122,0.00015411072],"genre_scores_gemma":[0.98791,0.00004972868,0.009678293,0.000041144616,0.00030084737,0.00040115588,0.0003505226,0.00006248851,0.0012058638],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99867773,0.000040038893,0.0003671325,0.00039458383,0.00017125977,0.0003492464],"domain_scores_gemma":[0.99932003,0.00006326287,0.0001230669,0.00023984608,0.0001358679,0.00011790868],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012270648,0.0002767487,0.00027459709,0.00019781374,0.0002011575,0.00004800742,0.00007869548,0.00015964045,0.000007882539],"category_scores_gemma":[0.000025139987,0.00028007082,0.000050449402,0.00017001321,0.000051918836,0.00023361026,0.000019548603,0.00004375105,1.5152702e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000083203864,0.000062573185,0.00007780694,0.00008925317,0.00011831875,0.000012485556,0.00026967606,0.992621,0.0015678512,0.0012886333,0.0021841177,0.0016250969],"study_design_scores_gemma":[0.0020749841,0.00039296324,0.000022519544,0.0000402454,0.000086349835,0.00034728838,0.000116910756,0.9921349,0.002573718,0.00030146254,0.0016148428,0.00029377072],"about_ca_topic_score_codex":0.0013557256,"about_ca_topic_score_gemma":0.007648362,"teacher_disagreement_score":0.91374743,"about_ca_system_score_codex":0.00021349607,"about_ca_system_score_gemma":0.00011474972,"threshold_uncertainty_score":0.99996513},"labels":[],"label_agreement":null},{"id":"W2793649869","doi":"10.1016/j.dib.2018.03.015","title":"Dataset for case studies of hydropower unit commitment","year":2018,"lang":"en","type":"article","venue":"Data in Brief","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Fundamental Research Funds for the Central Universities; National Key Research and Development Program of China","keywords":"Hydropower; Spillage; Computer science; Quarter (Canadian coin); Power (physics); Operations research; Power system simulation; Environmental science; Engineering; Electric power system; Electrical engineering; Waste management","score_opus":0.0796497880481104,"score_gpt":0.3505996372898815,"score_spread":0.2709498492417711,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2793649869","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27707154,0.010544137,0.34204683,0.00041173262,0.005259708,0.005527651,0.35572323,0.00051624345,0.002898903],"genre_scores_gemma":[0.9708588,0.0000935381,0.0059646238,0.000045381625,0.000090285976,0.00003251057,0.022861298,0.000027016586,0.000026540305],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99943376,0.000017543063,0.00021885124,0.00013479455,0.000065805885,0.00012925632],"domain_scores_gemma":[0.9990465,0.0000968513,0.000031413587,0.00076482526,0.000041062136,0.000019356983],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002838003,0.000074474185,0.00014515531,0.00006607646,0.000024140609,0.0000077602635,0.00024071077,0.000028052049,0.00001544042],"category_scores_gemma":[0.00011373877,0.00007457078,0.0000063414745,0.00017259177,0.000042404237,0.00017262563,0.00011538782,0.00003526929,0.000008793291],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024255736,0.00008002386,0.00064273854,0.00040537026,0.00021452764,0.00014011862,0.0005923887,0.0031913323,0.00020103753,0.0003044721,0.9922411,0.0019626415],"study_design_scores_gemma":[0.0016752224,0.00026043179,0.00012539068,0.00014647268,0.000077607736,0.00032104598,0.0003315983,0.41314274,0.0035245963,0.00007978322,0.5799386,0.0003764898],"about_ca_topic_score_codex":0.00009017742,"about_ca_topic_score_gemma":0.00043817656,"teacher_disagreement_score":0.6937873,"about_ca_system_score_codex":0.000032770342,"about_ca_system_score_gemma":0.000008348933,"threshold_uncertainty_score":0.3040908},"labels":[],"label_agreement":null},{"id":"W2795035203","doi":"","title":"Wind resources assessment of Cuba in future climate scenarios;Evaluación de los recursos eólicos de Cuba en futuros escenarios climáticos","year":2018,"lang":"es","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Environment and Climate Change Canada","funders":"","keywords":"Geography; Environmental protection","score_opus":0.005974751123479558,"score_gpt":0.28828726854922565,"score_spread":0.2823125174257461,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2795035203","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91653943,0.002355842,0.04479006,0.0011783101,0.0021099376,0.0033625925,0.000143779,0.00066358096,0.02885648],"genre_scores_gemma":[0.9771154,0.0017644463,0.018700294,0.00020113275,0.0016895597,0.000067584966,0.000035942754,0.00021420175,0.0002114642],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9938983,0.0009939056,0.0015963337,0.00085686287,0.00087275833,0.0017818959],"domain_scores_gemma":[0.99740255,0.00034491002,0.0004815802,0.0010654919,0.0003328829,0.00037261075],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0024967308,0.00080051465,0.0011017502,0.0008427584,0.00019978841,0.00025007888,0.0008376933,0.0009639325,0.00049070735],"category_scores_gemma":[0.00021658225,0.00081962324,0.0002514748,0.0016248957,0.00014112939,0.00043631665,0.0002276741,0.001012577,0.000075691],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00073256437,0.0022855694,0.622319,0.0074488036,0.0013118446,0.000256293,0.028313305,0.22587965,0.05979772,0.016380424,0.0082679335,0.027006906],"study_design_scores_gemma":[0.0027529714,0.0010526401,0.108707346,0.0021121888,0.00035735985,0.00012232977,0.0014938364,0.8634524,0.010068794,0.00006918584,0.008513282,0.001297718],"about_ca_topic_score_codex":0.0002809433,"about_ca_topic_score_gemma":0.00026817725,"teacher_disagreement_score":0.6375727,"about_ca_system_score_codex":0.0019390726,"about_ca_system_score_gemma":0.00053853233,"threshold_uncertainty_score":0.9994255},"labels":[],"label_agreement":null},{"id":"W2802332755","doi":"10.55016/ojs/sppp.v11i1.43169","title":"Capacity Market Design: Motivation and Challenges in Alberta’s Electricity Market","year":2018,"lang":"en","type":"article","venue":"The School of Public Policy Publications","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Electricity market; Business; Electricity; Industrial organization; Engineering; Electrical engineering","score_opus":0.06563642483577455,"score_gpt":0.24891384132560654,"score_spread":0.18327741648983198,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2802332755","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05650359,0.0035227851,0.15268932,0.12260673,0.00036298865,0.0029919737,0.00005070791,0.0010144036,0.6602575],"genre_scores_gemma":[0.99593157,0.0012371672,0.0012777977,0.000085699576,0.00020627784,0.00015966775,0.00000687669,0.00003405047,0.0010608841],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9982335,0.00039360742,0.00045068568,0.0002412051,0.00023102565,0.0004499542],"domain_scores_gemma":[0.99818206,0.0005995457,0.0001387603,0.00061577634,0.00029645936,0.00016738338],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001740232,0.0001852478,0.00021759483,0.0009282092,0.00012138884,0.0001078749,0.00044940264,0.00013541704,0.00021024747],"category_scores_gemma":[0.0041483287,0.00016251008,0.0000352405,0.0021838623,0.00013984847,0.0007769038,0.000051722087,0.0002189676,0.00001950041],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009253835,0.0008258897,0.07356539,0.00072512496,0.00085570564,5.411462e-7,0.005412166,0.002156576,0.0038119883,0.45642382,0.37950015,0.07663009],"study_design_scores_gemma":[0.00085577386,0.00013374756,0.79886085,0.000050989398,0.000031952146,0.000038765724,0.000088628956,0.15744653,0.001066213,0.009343084,0.03156682,0.00051662937],"about_ca_topic_score_codex":0.0008391449,"about_ca_topic_score_gemma":0.0007791897,"teacher_disagreement_score":0.939428,"about_ca_system_score_codex":0.0002913912,"about_ca_system_score_gemma":0.00025182936,"threshold_uncertainty_score":0.6626969},"labels":[],"label_agreement":null},{"id":"W2802676447","doi":"10.1007/s11149-018-9372-z","title":"Information and transparency in wholesale electricity markets: evidence from Alberta","year":2018,"lang":"en","type":"article","venue":"Journal of Regulatory Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Government of Alberta; University of Alberta","funders":"Canada First Research Excellence Fund","keywords":"Bidding; Transparency (behavior); Business; Public finance; Industrial organization; Electricity; Price discovery; Economics; Microeconomics; Finance","score_opus":0.005615980933468409,"score_gpt":0.1790408398679978,"score_spread":0.17342485893452939,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2802676447","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98813343,0.0011609466,0.0098082945,0.000047607835,0.0003137514,0.000064556094,0.00000204062,0.000010503302,0.00045889884],"genre_scores_gemma":[0.9977527,0.0011699263,0.0009043547,0.000021414171,0.00012833145,9.3935574e-7,0.0000010980403,0.0000094997595,0.000011694164],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991947,0.000023176855,0.00056836824,0.000047431044,0.000050526065,0.000115819006],"domain_scores_gemma":[0.99949867,0.000087788234,0.0001994914,0.00010518119,0.00005397794,0.000054916534],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033021043,0.000085168984,0.00018438789,0.00020095034,0.000018372919,0.00004071619,0.000111605565,0.00007669586,0.000018623992],"category_scores_gemma":[0.00005143424,0.00009147282,0.000028390135,0.00010925273,0.000020559824,0.0014445918,0.0000058030146,0.000110924906,0.000006511883],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001002808,0.00011550894,0.47464705,0.00059695827,0.00063961704,0.000011977721,0.020191554,0.2855162,0.005868882,0.0008190398,0.01232653,0.19826388],"study_design_scores_gemma":[0.0018470521,0.00030034737,0.3452621,0.00069888856,0.000064288535,0.00013280564,0.00015147436,0.63126475,0.009839239,0.000852717,0.009044174,0.0005421636],"about_ca_topic_score_codex":0.000035875917,"about_ca_topic_score_gemma":0.00013540957,"teacher_disagreement_score":0.34574854,"about_ca_system_score_codex":0.00021540953,"about_ca_system_score_gemma":0.000053763153,"threshold_uncertainty_score":0.37301534},"labels":[],"label_agreement":null},{"id":"W2802815197","doi":"","title":"Photovoltaics and the Slovak electricity market","year":2018,"lang":"en","type":"preprint","venue":"Econstor (Econstor)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"McGill University; Grantová Agentura České Republiky; European Commission; Univerzita Karlova v Praze","keywords":"Slovak; Photovoltaics; Electricity; Photovoltaic system; Electricity market; Spot contract; Economics; Market penetration; Environmental economics; Econometrics; Business; Engineering; Financial economics; Marketing; Electrical engineering","score_opus":0.006434802487923034,"score_gpt":0.19621811828251917,"score_spread":0.18978331579459615,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2802815197","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7165261,0.017744828,0.023996703,0.00019463236,0.010987884,0.003035101,0.00019353352,0.0017618976,0.22555931],"genre_scores_gemma":[0.9910071,0.0022849115,0.002152415,0.00020939307,0.0010865139,0.00036209408,0.000053992342,0.00021769863,0.002625915],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970288,0.000283897,0.0008912258,0.00076301733,0.0003196449,0.00071338116],"domain_scores_gemma":[0.9975758,0.00055835093,0.0003501395,0.0011373033,0.00017651121,0.0002018951],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0013539847,0.0007228211,0.0009863401,0.00038232483,0.00023300914,0.00024594378,0.0006867914,0.00074051,0.00073326234],"category_scores_gemma":[0.00028771974,0.0006426209,0.0002595486,0.00034909963,0.0005307609,0.00016863119,0.00035064475,0.0012518775,0.00015754049],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041212427,0.00015392556,0.2519951,0.0021415215,0.0029134813,0.000066525296,0.002108171,0.0065785637,0.00044696731,0.0026046443,0.7275567,0.0030222652],"study_design_scores_gemma":[0.0071227937,0.00019812695,0.024534358,0.0009501546,0.0009606025,0.00090435444,0.000109922585,0.8726975,0.0045737065,0.004336459,0.07905409,0.0045579886],"about_ca_topic_score_codex":0.00010193008,"about_ca_topic_score_gemma":0.000110644025,"teacher_disagreement_score":0.8661189,"about_ca_system_score_codex":0.0006136885,"about_ca_system_score_gemma":0.00031426005,"threshold_uncertainty_score":0.9996025},"labels":[],"label_agreement":null},{"id":"W2803436620","doi":"10.55016/ojs/sppp.v11i1.43162","title":"The Alberta Electrical Grid: What to Expect in the Next Few Years in Alberta","year":2018,"lang":"en","type":"article","venue":"The School of Public Policy Publications","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Grid; Environmental science; Geography; Meteorology; Geodesy","score_opus":0.023031192756098245,"score_gpt":0.2730696763947803,"score_spread":0.2500384836386821,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2803436620","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24705827,0.003202524,0.0063832123,0.5505202,0.0015321322,0.005766376,0.00002165766,0.00047745372,0.18503821],"genre_scores_gemma":[0.9958525,0.00027597602,0.00010733823,0.0010149014,0.00052755733,0.00054396404,0.000016344162,0.000042408836,0.0016190188],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.997641,0.0003942256,0.0006044363,0.00024674175,0.00038621415,0.00072734803],"domain_scores_gemma":[0.9971054,0.0011254251,0.00010741289,0.0013260071,0.0001635045,0.0001722417],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015111202,0.00019326448,0.00020758265,0.0008114186,0.0001943381,0.00087134773,0.0019147214,0.00011100921,0.000064890635],"category_scores_gemma":[0.003712902,0.00012171142,0.00007441287,0.0066218725,0.00011961248,0.0012231927,0.000101032216,0.00039733728,0.00033036177],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031721644,0.00041325623,0.011566499,0.000029983414,0.00024394218,9.846096e-7,0.016281318,0.0035761937,0.00064853067,0.5472968,0.38287014,0.037040595],"study_design_scores_gemma":[0.0012357646,0.00023265957,0.33341363,0.00010170335,0.000039703405,0.000071573915,0.0017539389,0.03717434,0.0002653004,0.0050323126,0.6198389,0.0008402074],"about_ca_topic_score_codex":0.008489367,"about_ca_topic_score_gemma":0.022473676,"teacher_disagreement_score":0.7487942,"about_ca_system_score_codex":0.0003760799,"about_ca_system_score_gemma":0.000421667,"threshold_uncertainty_score":0.9981132},"labels":[],"label_agreement":null},{"id":"W2811293213","doi":"10.46661/revmetodoscuanteconempresa.2914","title":"Dinámica de inversión y competencia en generación eléctrica en un escenario de liberalización en el Perú: La importancia de los contratos de largo plazo","year":2019,"lang":"es","type":"article","venue":"Revista de Métodos Cuantitativos para la Economía y la Empresa","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"HEC Montréal; Pontificia Universidad Católica del Perú","keywords":"Physics; Humanities; Philosophy","score_opus":0.004699145159331302,"score_gpt":0.25564896917766855,"score_spread":0.25094982401833726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2811293213","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89199466,0.009684347,0.0845842,0.00026598547,0.00020240722,0.0020315086,0.00043834638,0.0006486506,0.010149903],"genre_scores_gemma":[0.9633258,0.006303012,0.02797666,0.00048880716,0.000396862,0.0002162316,0.00017921714,0.00042604035,0.00068736105],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99009615,0.0041684485,0.0017145745,0.0012289725,0.00042778548,0.0023640394],"domain_scores_gemma":[0.99264556,0.004301749,0.00075679884,0.0012214837,0.00017423971,0.00090017053],"candidate_categories":["metaepi_narrow","scholarly_communication","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0040476155,0.0012714718,0.0018056169,0.0006303531,0.00026014008,0.0010596019,0.0014051012,0.0014805848,0.00032347732],"category_scores_gemma":[0.0009480872,0.0015226885,0.00061515305,0.00079764193,0.00016300009,0.00086554285,0.00025296575,0.0016540324,0.00037899087],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046470712,0.00073391804,0.6164064,0.004719095,0.0038574247,0.0012174926,0.015215544,0.11786504,0.067449994,0.16253288,0.007534675,0.0020028278],"study_design_scores_gemma":[0.0058264164,0.0004884478,0.09779862,0.002656213,0.0017096694,0.0016304161,0.00039131092,0.736069,0.009171248,0.0010228091,0.13945836,0.0037774649],"about_ca_topic_score_codex":0.00059828325,"about_ca_topic_score_gemma":0.000072556824,"teacher_disagreement_score":0.618204,"about_ca_system_score_codex":0.0030308058,"about_ca_system_score_gemma":0.0019790581,"threshold_uncertainty_score":0.9999774},"labels":[],"label_agreement":null},{"id":"W2889124897","doi":"10.1109/ccece.2018.8447667","title":"An Approach for Managing DG Investment Proposals Considering System Constraints and DG Incentives","year":2018,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Incentive; Investment (military); Computer science; Business; Environmental economics; Risk analysis (engineering); Economics; Microeconomics; Political science","score_opus":0.010426379335487332,"score_gpt":0.2170592702783368,"score_spread":0.20663289094284948,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889124897","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017631464,0.00018794036,0.92895854,0.00001142954,0.00023125579,0.001016179,0.0000050751846,0.00070561125,0.051252518],"genre_scores_gemma":[0.90318006,0.000006258871,0.09652864,0.00003278805,0.000071257884,0.000084445455,0.000010536201,0.000032653174,0.00005334714],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991376,0.000034019926,0.00023599793,0.00023655036,0.00009435478,0.00026152554],"domain_scores_gemma":[0.9996041,0.000029722514,0.000035976358,0.000174478,0.00006322958,0.00009248097],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002538201,0.00015051838,0.0001848995,0.000105762134,0.00009492281,0.00009251648,0.00007748019,0.000058810267,0.0000070887977],"category_scores_gemma":[0.0000121139265,0.00014271481,0.000018147724,0.000114868155,0.00009876153,0.00022905743,0.000018289564,0.000043457807,0.0000033726799],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001576068,0.0004511704,0.014805453,0.01976125,0.0021991762,0.000041906056,0.018992258,0.084597945,0.090751976,0.69679004,0.0065561314,0.064895116],"study_design_scores_gemma":[0.00045073943,0.00007631532,0.000075612144,0.00009016503,0.000022867785,0.00004465174,0.0013029237,0.98648584,0.011013719,0.00010960053,0.000102558486,0.00022503312],"about_ca_topic_score_codex":0.0000070139195,"about_ca_topic_score_gemma":0.0000028681914,"teacher_disagreement_score":0.9018879,"about_ca_system_score_codex":0.00010421384,"about_ca_system_score_gemma":0.000018926157,"threshold_uncertainty_score":0.58197415},"labels":[],"label_agreement":null},{"id":"W2889206710","doi":"10.1109/ccece.2018.8447753","title":"Fuel Cost Modeling for Spinning Reserve Thermal Generating Units","year":2018,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Spinning; Grid; Thermal; Fuel efficiency; Polynomial; Computer science; Power (physics); Automotive engineering; Environmental science; Engineering; Mathematics; Mechanical engineering; Physics; Thermodynamics","score_opus":0.04075719262319818,"score_gpt":0.24928093539104698,"score_spread":0.2085237427678488,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889206710","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.074171044,0.00018681449,0.9101363,0.00001806141,0.00031874346,0.00029935368,0.0000020792054,0.00039465155,0.014472972],"genre_scores_gemma":[0.95920485,0.0000046495443,0.039886042,0.000045036097,0.0004525239,0.000048277412,0.000015016723,0.000047596157,0.00029602135],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992973,0.0000140630245,0.00020679497,0.0001267705,0.00008834146,0.00026670875],"domain_scores_gemma":[0.999525,0.000029216726,0.000019743702,0.00015258913,0.00023093451,0.000042523432],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002209517,0.00010404077,0.000100781326,0.000070061964,0.00009884625,0.000055235007,0.00010629407,0.00006396985,0.000027632668],"category_scores_gemma":[0.00007582928,0.00010229192,0.000019583329,0.00028594662,0.000006829505,0.00017184854,0.000016697344,0.00006121585,0.000015867303],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000034090665,0.0000019065135,0.000042693246,0.000039301423,0.000016995587,3.0007905e-7,0.00027117098,0.98429453,0.012735738,0.00039903104,0.00068989635,0.0015050247],"study_design_scores_gemma":[0.00021465636,0.00003196546,0.0000035073997,0.000027470403,0.000005729853,0.000001900957,0.00004473237,0.9929736,0.006168598,0.000018472148,0.0003788154,0.00013054276],"about_ca_topic_score_codex":0.0000284859,"about_ca_topic_score_gemma":0.000049641865,"teacher_disagreement_score":0.8850338,"about_ca_system_score_codex":0.000058038895,"about_ca_system_score_gemma":0.000020739288,"threshold_uncertainty_score":0.4171343},"labels":[],"label_agreement":null},{"id":"W2889709436","doi":"10.3390/su10093263","title":"A Multistage Distribution-Generation Planning Model for Clean Power Generation under Multiple Uncertainties—A Case Study of Urumqi, China","year":2018,"lang":"en","type":"article","venue":"Sustainability","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Electricity generation; Renewable energy; Electric power system; Environmental economics; Power (physics); Distributed generation; Environmental science; Reliability engineering; Computer science; Engineering; Economics; Electrical engineering","score_opus":0.02404227177702084,"score_gpt":0.2816275249424786,"score_spread":0.2575852531654578,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889709436","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5123207,0.000019878158,0.4862365,0.000013045844,0.00015820946,0.0010957073,0.000042124204,0.00010233197,0.000011483576],"genre_scores_gemma":[0.99812764,5.434305e-7,0.0011805381,0.0000055522,0.00015044786,0.00020526967,0.00021212678,0.000039312887,0.000078579826],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99846524,0.00010283813,0.00053263386,0.0003602957,0.0001946075,0.0003444011],"domain_scores_gemma":[0.998339,0.00006511802,0.000110528876,0.0004530104,0.0009618047,0.000070552276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055921305,0.0002169214,0.00025185148,0.00009326074,0.0002887203,0.00004995748,0.00010337376,0.00012297605,0.0000072708835],"category_scores_gemma":[0.00048162782,0.00022965427,0.0000638987,0.00031280555,0.0000569885,0.00027563772,0.00003036474,0.000106557425,4.765049e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034108085,0.00022894866,0.0037045942,0.000106124346,0.000046981848,0.000011003945,0.008156176,0.98539835,0.00072107825,0.00038006547,0.0006746752,0.0005378773],"study_design_scores_gemma":[0.0010270308,0.00035493734,0.0010385676,0.0000052665346,0.000031994437,0.000016594193,0.005457865,0.99024165,0.0014279967,0.00015471679,0.000024179011,0.00021922501],"about_ca_topic_score_codex":0.0005229357,"about_ca_topic_score_gemma":0.0010767137,"teacher_disagreement_score":0.4858069,"about_ca_system_score_codex":0.0011456048,"about_ca_system_score_gemma":0.00013534173,"threshold_uncertainty_score":0.93650293},"labels":[],"label_agreement":null},{"id":"W2893750247","doi":"10.1016/j.apenergy.2019.02.059","title":"Extended opportunity cost model to find near equilibrium electricity prices under non-convexities","year":2019,"lang":"en","type":"article","venue":"Applied Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Opportunity cost; Economics; Mixed complementarity problem; Electricity; Mathematical optimization; Electricity market; Profit (economics); Demand response; Total cost; Microeconomics; Computer science; Econometrics; Mathematics","score_opus":0.01285015146387695,"score_gpt":0.2085758620638039,"score_spread":0.19572571059992697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2893750247","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19759277,0.00009623194,0.64886916,0.000054839595,0.00032552017,0.000514384,0.000009228503,0.00061437796,0.15192352],"genre_scores_gemma":[0.9939689,0.0000239176,0.0027934902,0.0004345343,0.000058743342,0.00013522062,0.000046825575,0.000081849365,0.00245652],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998579,0.000012191151,0.00030169997,0.0003198154,0.00026532062,0.00052192755],"domain_scores_gemma":[0.99918216,0.000053414024,0.000055498193,0.00043786672,0.000050976716,0.00022007975],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012858261,0.00026517326,0.00030903032,0.00015229602,0.00005375874,0.00008662846,0.00027851775,0.00016380308,0.00011151975],"category_scores_gemma":[0.0000073728697,0.00028842746,0.000048179394,0.00050936383,0.000017127468,0.00015622358,0.00006123443,0.00014736685,0.00013510625],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018602705,0.000026349833,0.000007865464,0.00003783094,0.000044084205,8.6216386e-7,0.00013053203,0.95343167,0.029032253,0.013159513,0.0027503863,0.0013600495],"study_design_scores_gemma":[0.0003409332,0.00004397168,0.00015555874,0.000010639636,0.000014918475,0.0000029121309,0.000030496709,0.95977014,0.036232695,0.00093853596,0.0020584946,0.00040070142],"about_ca_topic_score_codex":0.00007300183,"about_ca_topic_score_gemma":0.000014504911,"teacher_disagreement_score":0.7963761,"about_ca_system_score_codex":0.00019443437,"about_ca_system_score_gemma":0.00012419387,"threshold_uncertainty_score":0.9999568},"labels":[],"label_agreement":null},{"id":"W2896503442","doi":"10.11575/prism/30086","title":"Real-Time Pricing and Demand Response in Alberta's Electricity Market","year":2013,"lang":"en","type":"article","venue":"Open MIND","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Demand response; Electricity market; Economics; Electricity; Business; Microeconomics; Engineering","score_opus":0.00587148360492477,"score_gpt":0.216000513491014,"score_spread":0.21012902988608925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2896503442","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9410824,0.00007411059,0.00089732587,0.00005818223,0.00003123519,0.00071912346,6.6732207e-7,0.0000062312806,0.057130717],"genre_scores_gemma":[0.9874184,0.00006561911,0.005137504,0.000005765158,0.000011800852,0.000045198987,0.0000027590106,0.00002325575,0.007289691],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991518,0.00013756,0.00022746043,0.00017986214,0.00006657972,0.00023669351],"domain_scores_gemma":[0.9994669,0.0002612261,0.000033390286,0.00016055693,0.000016667736,0.000061234074],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0006357407,0.00011398504,0.00018827425,0.00013703959,0.000029710985,0.0001405846,0.00015271267,0.00007477716,0.0009274695],"category_scores_gemma":[0.00013931777,0.000115031864,0.000010830551,0.00034436703,0.000007694252,0.00035012403,0.000045601333,0.00008482902,0.00031188224],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019252481,0.00028396343,0.0316599,0.00020385568,0.00024797462,0.00009986797,0.011714269,0.05419829,0.64904666,0.000027976334,0.06529971,0.18529229],"study_design_scores_gemma":[0.0011503928,0.00013990661,0.057682484,0.00011874106,0.000016728854,0.000042540167,0.000029047782,0.9215392,0.014299528,0.000037153157,0.0044564107,0.0004878884],"about_ca_topic_score_codex":0.00078888156,"about_ca_topic_score_gemma":0.00013006193,"teacher_disagreement_score":0.86734086,"about_ca_system_score_codex":0.000098639364,"about_ca_system_score_gemma":0.000022421415,"threshold_uncertainty_score":0.9999858},"labels":[],"label_agreement":null},{"id":"W2897063562","doi":"10.2139/ssrn.4218422","title":"An Efficient Data Driven Model for Generation Expansion Planning with Short Term Operational Constraints","year":2022,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Term (time); Computer science; Operations research; Engineering","score_opus":0.024277159022460828,"score_gpt":0.2581853617901574,"score_spread":0.23390820276769655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897063562","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18445535,0.0003385039,0.81457263,0.000029237506,0.00014970971,0.00028778805,0.000042467447,0.00007501734,0.000049312202],"genre_scores_gemma":[0.99259067,0.000042303924,0.006208204,0.00002214378,0.0002050127,0.00006016599,0.00077833625,0.000048192465,0.00004498056],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99817824,0.000055591758,0.0002674597,0.00024955644,0.000353133,0.00089599035],"domain_scores_gemma":[0.9995222,0.000016346372,0.00005018526,0.0002748177,0.0000714849,0.00006494941],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009776434,0.00014594746,0.00013478214,0.0001334391,0.00050030975,0.000086156695,0.00037892713,0.000037341222,0.000012777863],"category_scores_gemma":[0.000008676736,0.00014199554,0.000024604413,0.00013922647,0.000015762316,0.00031212642,0.000034549274,0.00067345693,5.715606e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002524064,0.00003835565,0.00018322776,0.000004106296,0.0000664939,0.0000017793958,0.00027601587,0.98852026,0.0069116415,0.0019329521,0.00015019128,0.0018897352],"study_design_scores_gemma":[0.000496718,0.00029135987,0.000019004292,0.000008618719,0.000030442136,0.0004997197,0.00029235502,0.99786836,0.00016316863,0.00012407251,0.000024364272,0.0001817977],"about_ca_topic_score_codex":0.0000014147937,"about_ca_topic_score_gemma":0.000036083715,"teacher_disagreement_score":0.8083644,"about_ca_system_score_codex":0.0010364567,"about_ca_system_score_gemma":0.0012022128,"threshold_uncertainty_score":0.579041},"labels":[],"label_agreement":null},{"id":"W2898532498","doi":"10.1049/iet-rpg.2018.5136","title":"Flexibility of controllable power transformers for managing wind uncertainty using robust adjustable linearised optimal power flow","year":2018,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Etobicoke General Hospital","funders":"","keywords":"Power flow; Wind power; Flexibility (engineering); Control theory (sociology); Transformer; Computer science; Control engineering; Electric power system; Power (physics); Engineering; Electrical engineering; Voltage; Mathematics; Physics; Control (management)","score_opus":0.02435239974870437,"score_gpt":0.24279541440481442,"score_spread":0.21844301465611005,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2898532498","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15993683,0.0006011114,0.8319788,0.00004505808,0.0015353733,0.0011467965,0.00008257206,0.00022617205,0.0044473107],"genre_scores_gemma":[0.9522686,0.000027880471,0.04660201,0.000052223437,0.0002455506,0.000041630403,0.00015524508,0.000106361345,0.0005005063],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974237,0.00008426012,0.00085321773,0.000536786,0.0003854476,0.0007165593],"domain_scores_gemma":[0.99851036,0.00006734912,0.0001772041,0.00043256083,0.00066548685,0.00014704482],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008625686,0.0003973168,0.0005600287,0.00026969478,0.00025461422,0.0001278543,0.00019372988,0.0002947233,0.00032396152],"category_scores_gemma":[0.000085571264,0.0004239268,0.00017848158,0.0006543768,0.000085163156,0.00064502633,0.000020176747,0.00013467448,0.0000074320956],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016040125,0.00004795624,0.00003971844,0.00006585979,0.00012485783,7.1537835e-7,0.00052788545,0.8785777,0.11771109,0.000032743596,0.0025320253,0.00017903536],"study_design_scores_gemma":[0.0016997386,0.0003318543,0.000008046782,0.000049242542,0.00008139864,0.000005095431,0.00016689367,0.88479465,0.11039819,0.000028162543,0.002050352,0.00038635553],"about_ca_topic_score_codex":0.0002964648,"about_ca_topic_score_gemma":0.00024031305,"teacher_disagreement_score":0.79233176,"about_ca_system_score_codex":0.00036527755,"about_ca_system_score_gemma":0.00020138877,"threshold_uncertainty_score":0.99982125},"labels":[],"label_agreement":null},{"id":"W2899642659","doi":"10.1109/tsg.2018.2879876","title":"A Novel Capacity Market Model With Energy Storage","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Electric Power System Optimization","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Independent Electricity System Operator","keywords":"Nameplate capacity; Capacity planning; Computer science; Procurement; Electricity; Electricity market; Capacity utilization; Investment (military); Capacity factor; Energy storage; Environmental economics; Electricity generation; Business; Power (physics); Microeconomics; Economics; Engineering; Electrical engineering","score_opus":0.011668284431967943,"score_gpt":0.18243881844231533,"score_spread":0.1707705340103474,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2899642659","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005711599,0.000011280286,0.98233235,0.000025937588,0.0011073273,0.00011401962,0.00006490022,0.0004871974,0.0101453755],"genre_scores_gemma":[0.9877979,0.00001636825,0.010298116,0.00007216342,0.00014108593,0.000065620945,0.0000028119264,0.00006347197,0.001542439],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99909496,0.000019652027,0.00018065276,0.00021785067,0.00021070789,0.00027615824],"domain_scores_gemma":[0.9994445,0.00002931413,0.000026375672,0.00032107573,0.000082568746,0.00009619166],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000907276,0.0001976627,0.00016481313,0.00017797576,0.00013132967,0.000029940571,0.00011694913,0.00009918484,0.00010799554],"category_scores_gemma":[0.0000011482542,0.00018911247,0.00005054981,0.00038944924,0.000048489306,0.0001962708,3.726762e-7,0.00016273648,0.00003156601],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051411458,0.000076269425,0.00000272792,0.000019424382,0.000079735786,0.0000015615888,0.0001630303,0.9897173,0.004692187,0.000035618443,0.004319138,0.0008415852],"study_design_scores_gemma":[0.00043703185,0.00012815683,0.000018938386,0.0000315143,0.00003239905,0.00003738992,0.0000060733623,0.96882564,0.028107705,0.0000067517976,0.0021289603,0.00023942317],"about_ca_topic_score_codex":0.00009150899,"about_ca_topic_score_gemma":0.00049267494,"teacher_disagreement_score":0.9820863,"about_ca_system_score_codex":0.00015817219,"about_ca_system_score_gemma":0.000034584442,"threshold_uncertainty_score":0.77117825},"labels":[],"label_agreement":null},{"id":"W2900270437","doi":"10.1108/ijesm-07-2018-0017","title":"Determining the efficacy of consolidating municipal electric utilities in Ontario, Canada","year":2018,"lang":"en","type":"article","venue":"International Journal of Energy Sector Management","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Equity (law); Consolidation (business); Shareholder; Electricity; Finance; Business; Operational efficiency; Debt; Mergers and acquisitions; Government (linguistics); Electric power distribution; Electric utility; Wilcoxon signed-rank test; Accounting; Economics; Marketing; Engineering; Economic growth; Corporate governance","score_opus":0.009803151229255328,"score_gpt":0.20842337625384263,"score_spread":0.19862022502458732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2900270437","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9787798,0.00011540878,0.0035765637,0.000032561038,0.0016696226,0.000052664265,0.0000011655761,0.000009909344,0.015762307],"genre_scores_gemma":[0.99929017,0.00002345008,0.00031946856,0.000053692493,0.00013444101,0.000002461453,0.0000023079826,0.000011904787,0.00016210736],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99886197,0.000035741094,0.00049493223,0.00006253683,0.00040355464,0.00014127947],"domain_scores_gemma":[0.9993483,0.00012517557,0.00019634528,0.00009710827,0.00020876007,0.000024311415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019242974,0.00009008959,0.00013559723,0.00025888023,0.000019772107,0.000024424795,0.00041970177,0.000020767047,0.00008584321],"category_scores_gemma":[0.00003949299,0.00007514411,0.000039235932,0.00016207744,0.0000167487,0.00009503666,0.00003957524,0.00010934352,2.9186958e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004403404,0.0003593665,0.120478034,0.00011801379,0.0043151635,0.00047259632,0.0065533808,0.7910548,0.0019608336,0.01997568,0.010694882,0.043576952],"study_design_scores_gemma":[0.007992759,0.000697962,0.58825076,0.0012842112,0.00021813237,0.00021280056,0.0012200131,0.28101256,0.023726422,0.0004416793,0.093958415,0.0009842635],"about_ca_topic_score_codex":0.23765357,"about_ca_topic_score_gemma":0.8266624,"teacher_disagreement_score":0.58900887,"about_ca_system_score_codex":0.0007367548,"about_ca_system_score_gemma":0.000118634554,"threshold_uncertainty_score":0.767423},"labels":[],"label_agreement":null},{"id":"W2901068911","doi":"10.1522/revueot.v14n2.626","title":"Analyse des avantages et des coûts de la politique de bas prix de l’énergie hydroélectrique : le cas d’Alcan au Saguenay–Lac-Saint-Jean","year":2005,"lang":"fr","type":"article","venue":"Revue Organisations & territoires","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Humanities; Geology; Environmental science; Art","score_opus":0.00995397934426707,"score_gpt":0.2537351508766761,"score_spread":0.24378117153240902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901068911","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68879724,0.005747557,0.27316725,0.025401967,0.00018685505,0.00056910404,0.00007831912,0.00074914464,0.0053025587],"genre_scores_gemma":[0.9244122,0.0026086995,0.06463753,0.00017550819,0.0008716782,0.00008939012,0.00008368092,0.0002519993,0.006869337],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9956241,0.0013136867,0.00082079624,0.0005361171,0.00022244023,0.0014828462],"domain_scores_gemma":[0.9975523,0.000884731,0.0002301978,0.00064408826,0.00017043363,0.0005182843],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001377361,0.00058691826,0.0005599849,0.0005999453,0.00066223246,0.00038475875,0.00049012044,0.000608461,0.00014121523],"category_scores_gemma":[0.0011091119,0.0007597847,0.0002250951,0.0009785185,0.00037869366,0.0008226476,0.00008198669,0.00068895955,0.000056211185],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021266897,0.00056609575,0.14192191,0.0011907222,0.00062652864,0.00022737583,0.06496188,0.6674443,0.08512587,0.016082121,0.005210254,0.016621707],"study_design_scores_gemma":[0.0017847442,0.00034446386,0.08873441,0.0025173523,0.00090969267,0.0040591713,0.0016717984,0.41853955,0.37118444,0.01290287,0.09488854,0.002462962],"about_ca_topic_score_codex":0.36685726,"about_ca_topic_score_gemma":0.17544961,"teacher_disagreement_score":0.28605857,"about_ca_system_score_codex":0.019907756,"about_ca_system_score_gemma":0.0031672716,"threshold_uncertainty_score":0.9994853},"labels":[],"label_agreement":null},{"id":"W2902729105","doi":"10.1051/e3sconf/20186402007","title":"Innovation of price adjustment mechanisms to support investment in solar power in Germany","year":2018,"lang":"en","type":"article","venue":"E3S Web of Conferences","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Investment (military); Tariff; Economics; Electricity; Microeconomics; Renewable energy; Order (exchange); Mechanism (biology); Econometrics; Quarter (Canadian coin); Environmental economics; Industrial organization; Engineering; International economics; Finance","score_opus":0.013715395686445163,"score_gpt":0.23566550271582676,"score_spread":0.2219501070293816,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2902729105","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.878098,0.00007804461,0.0421843,0.00007628273,0.00058516674,0.00066917733,0.0000072107755,0.00006261719,0.078239165],"genre_scores_gemma":[0.9976932,0.000014094529,0.0021226662,0.000064502725,0.000013195978,0.000029021627,0.0000058501796,0.000009577961,0.00004790328],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.998951,0.000028961298,0.0005205648,0.0001252633,0.0002056615,0.00016851032],"domain_scores_gemma":[0.9995647,0.000020730193,0.00009647408,0.0001439426,0.00014824275,0.000025907384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034392157,0.00010331124,0.0002145005,0.0005681722,0.000006230976,0.000006822107,0.00013870926,0.000066262684,0.00017787544],"category_scores_gemma":[0.000037091453,0.0001045774,0.000012784819,0.00095931126,0.000019473724,0.00011076387,0.000022994596,0.000058371163,0.000013767571],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009962923,0.00044049358,0.0149294045,0.00048801987,0.0001341831,0.0000093173385,0.00921961,0.012155954,0.42065588,0.5324817,0.0028199991,0.0065658805],"study_design_scores_gemma":[0.0022951683,0.002706958,0.13742542,0.000764111,0.000024081455,0.0000050435165,0.00070823537,0.06514289,0.7766426,0.0075334017,0.005917488,0.0008345906],"about_ca_topic_score_codex":0.000045771543,"about_ca_topic_score_gemma":0.00013993804,"teacher_disagreement_score":0.52494824,"about_ca_system_score_codex":0.00007709179,"about_ca_system_score_gemma":0.00025153777,"threshold_uncertainty_score":0.42645425},"labels":[],"label_agreement":null},{"id":"W2903796948","doi":"10.1016/j.aej.2018.01.014","title":"Real coded genetic algorithm based transmission system loss estimation in dynamic economic dispatch problem","year":2018,"lang":"en","type":"article","venue":"Alexandria Engineering Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electric power system; Transmission loss; Genetic algorithm; Computer science; Scheduling (production processes); Economic dispatch; Mathematical optimization; Transmission (telecommunications); Data loss; Real-time computing; Power (physics); Algorithm; Telecommunications; Mathematics","score_opus":0.0023044777476028,"score_gpt":0.1860449147385256,"score_spread":0.1837404369909228,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2903796948","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.072180845,0.0002327045,0.92591393,0.000016829845,0.00085314456,0.00025649922,0.000005886997,0.00035720225,0.00018298045],"genre_scores_gemma":[0.7736133,0.00010369307,0.22600172,0.0000017182358,0.0001497067,0.000021797965,0.000012507036,0.000078885794,0.000016682021],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985019,0.000041235806,0.0006303233,0.00020553914,0.00018591485,0.0004351055],"domain_scores_gemma":[0.99947214,0.000045096207,0.000087127315,0.00018626555,0.00004720553,0.00016215192],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00031756482,0.0002630779,0.00029572067,0.0003924479,0.00007248122,0.00010538202,0.00019508034,0.00015016622,0.00003344935],"category_scores_gemma":[0.0000064568676,0.00027780212,0.000067789,0.000263973,0.0000142846575,0.00024871956,0.000008231753,0.00029029968,0.000041746916],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008366531,0.000009419933,0.00024590184,0.00015267551,0.000025560113,0.000032597218,0.00013869761,0.9878361,0.0014019127,0.000012707909,0.00006110916,0.010074928],"study_design_scores_gemma":[0.001002541,0.00007803313,0.0031576545,0.00049528567,0.000024395806,0.00035765645,0.0000065646013,0.9935565,0.0009315757,0.0000065728386,0.000096521486,0.00028671147],"about_ca_topic_score_codex":0.00002228708,"about_ca_topic_score_gemma":0.00001244632,"teacher_disagreement_score":0.70143247,"about_ca_system_score_codex":0.00095970347,"about_ca_system_score_gemma":0.00007108446,"threshold_uncertainty_score":0.9999674},"labels":[],"label_agreement":null},{"id":"W2905241030","doi":"10.1049/iet-rpg.2018.5635","title":"Interval based robust chance constrained allocation of demand response programs in wind integrated power systems","year":2018,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Etobicoke General Hospital","funders":"","keywords":"Demand response; Interval (graph theory); Wind power; Mathematical optimization; Electric power system; Computer science; Operations research; Power (physics); Reliability engineering; Mathematics; Engineering; Electrical engineering","score_opus":0.021562658318523775,"score_gpt":0.21533182182985594,"score_spread":0.19376916351133217,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2905241030","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45690566,0.0003301025,0.54004365,0.000045872275,0.0010425451,0.00069694134,0.000009631885,0.00018334355,0.0007422571],"genre_scores_gemma":[0.9961077,0.000009644593,0.003286215,0.000020271109,0.000070374146,0.00007384743,0.0001658934,0.000050039136,0.00021600616],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980926,0.00028691886,0.0006985017,0.0003188578,0.00027625234,0.00032687222],"domain_scores_gemma":[0.9989493,0.00004986403,0.00016600075,0.00035658458,0.00040750636,0.00007073243],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001040358,0.0002479394,0.00032099232,0.00037070017,0.00005135762,0.00009661149,0.00015983026,0.00021625035,0.000047633974],"category_scores_gemma":[0.00012637553,0.00025640597,0.0000475003,0.0009028829,0.0000758727,0.00030176656,0.000012426115,0.000108860346,0.000011480111],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020700815,0.00007553266,0.0006801199,0.000050659,0.00003406154,0.0000029152955,0.00069202355,0.7953425,0.20183575,0.00006080882,0.0008899986,0.00012864695],"study_design_scores_gemma":[0.0008608659,0.00044505612,0.00034506115,0.00025355764,0.000012850841,0.000008969725,0.00014906013,0.915372,0.08154856,0.0000034761126,0.00074320444,0.0002573248],"about_ca_topic_score_codex":0.00022286098,"about_ca_topic_score_gemma":0.0004960588,"teacher_disagreement_score":0.53920203,"about_ca_system_score_codex":0.0002480808,"about_ca_system_score_gemma":0.00016506629,"threshold_uncertainty_score":0.9999888},"labels":[],"label_agreement":null},{"id":"W2906588870","doi":"10.1109/pesgm.2018.8586552","title":"Modeling Hourly Original Operating Reserve Prices in Electricity Market","year":2018,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; Independent Electricity System Operator","funders":"","keywords":"Econometrics; Electricity market; Electricity; Market price; Markov process; Economics; Markov chain; Computer science; Microeconomics; Statistics; Mathematics; Engineering; Electrical engineering","score_opus":0.010716723759911083,"score_gpt":0.22891659802805178,"score_spread":0.2181998742681407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2906588870","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3764615,0.00018551911,0.53638774,0.000022309905,0.00016499692,0.00017144244,7.0861904e-7,0.00035197334,0.08625379],"genre_scores_gemma":[0.9780484,0.000026305002,0.021393333,0.000021858516,0.00014647991,0.000014856236,0.0000024789515,0.000027998656,0.0003183031],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99901783,0.000029119978,0.0002799399,0.00017672728,0.00015973201,0.00033661662],"domain_scores_gemma":[0.99966407,0.000032294512,0.000016225593,0.00016152898,0.000080904865,0.000044948214],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004357346,0.00012463456,0.00014223371,0.0001997281,0.000054940254,0.000071327646,0.00016014646,0.00007451364,0.0001810599],"category_scores_gemma":[0.00006354882,0.0001212888,0.000019366347,0.0007477719,0.0000070887863,0.00032543472,0.000017414503,0.00015005408,0.00003585306],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017250022,0.00002661747,0.005002122,0.00007230191,0.000030046735,0.000008437119,0.0004467306,0.98487014,0.0030085123,0.00094966363,0.004162506,0.0014057055],"study_design_scores_gemma":[0.0001805099,0.000043792603,0.00014802872,0.000030763713,0.0000027552821,0.000005803325,0.000018674098,0.9967589,0.0024621398,0.000039788138,0.00015832276,0.00015054394],"about_ca_topic_score_codex":0.00047417215,"about_ca_topic_score_gemma":0.00068794785,"teacher_disagreement_score":0.6015869,"about_ca_system_score_codex":0.00016813219,"about_ca_system_score_gemma":0.000031737472,"threshold_uncertainty_score":0.49460137},"labels":[],"label_agreement":null},{"id":"W2907825999","doi":"10.5539/mas.v13n1p237","title":"Planning the Expansion of Long-Term Transmission Networks Using a Cycle-Based Formulation","year":2018,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universidad Tecnológica de Pereira; Conselho Nacional de Desenvolvimento Científico e Tecnológico; Coordenação de Aperfeiçoamento de Pessoal de Nível Superior; Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Term (time); Computer science; Mathematical optimization; Transmission (telecommunications); Graph; Network planning and design; Transmission network; Polynomial expansion; Mathematics; Theoretical computer science; Telecommunications","score_opus":0.016397785060329875,"score_gpt":0.24704321675122304,"score_spread":0.23064543169089316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2907825999","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30801913,0.000054151686,0.6910421,0.000003249643,0.00007926175,0.00017835485,1.914029e-7,0.00007710186,0.00054645626],"genre_scores_gemma":[0.99491835,0.000001539675,0.0049901507,0.00001537898,0.000046589797,0.000007448646,0.0000020214611,0.000016606184,0.0000019016686],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99901617,0.000010074563,0.00020662812,0.00018322283,0.00032881953,0.00025506326],"domain_scores_gemma":[0.99956685,0.0000312286,0.000061746054,0.0002345345,0.00005872822,0.000046920297],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040749437,0.000101496415,0.00010108255,0.0001185544,0.0002530339,0.000042235508,0.00025480764,0.000053482338,0.0000044055773],"category_scores_gemma":[0.0000045282754,0.0000783588,0.00002083072,0.00067595975,0.00011514892,0.00016617724,0.00001644884,0.000079086996,0.0000012273972],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008901441,0.0000032302153,0.0001886521,0.00001229926,0.0000012819362,1.8983921e-7,0.0004420826,0.71521634,0.27242458,0.00002919115,0.0000014085481,0.011671852],"study_design_scores_gemma":[0.00015950752,0.000018146617,0.0016155955,0.00006665016,0.000006615871,0.0000018352721,0.0000053994845,0.9248899,0.07309075,0.00005875557,0.0000011327227,0.0000856921],"about_ca_topic_score_codex":0.000003110435,"about_ca_topic_score_gemma":8.3482394e-7,"teacher_disagreement_score":0.68689924,"about_ca_system_score_codex":0.00008867138,"about_ca_system_score_gemma":0.00005401935,"threshold_uncertainty_score":0.3195379},"labels":[],"label_agreement":null},{"id":"W2908798837","doi":"10.1016/j.ijindorg.2018.12.004","title":"Environmental implications of market structure: Shale gas and electricity markets","year":2019,"lang":"en","type":"article","venue":"International Journal of Industrial Organization","topic":"Electric Power System Optimization","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Boom; Electricity; Natural resource economics; Market power; Electric power; Market structure; Natural gas; Economics; Factor market; Industrial organization; Oil shale; Electricity market; Natural gas prices; Shale gas; Business; Greenhouse gas; Commerce; Market economy; Power (physics); Environmental science; Waste management; Environmental engineering; Ecology; Engineering","score_opus":0.0041845607577583694,"score_gpt":0.17933104240146563,"score_spread":0.17514648164370727,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2908798837","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98993117,0.00012574064,0.008072776,0.00015864709,0.0010065805,0.0001538628,0.000042932446,0.0000199059,0.00048841524],"genre_scores_gemma":[0.9991737,0.00016435837,0.00031991457,0.000016013848,0.00023583046,3.7890504e-7,0.000028113855,0.000023930104,0.000037765396],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9990035,0.000041766794,0.00048218475,0.000083218256,0.00029958336,0.000089736],"domain_scores_gemma":[0.99926966,0.00007098161,0.00031070109,0.00008365423,0.0002176973,0.000047309324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016336128,0.000098313794,0.00016271631,0.00024668392,0.000016320686,0.000033384702,0.00021306693,0.00011951718,0.0006724799],"category_scores_gemma":[0.00015040042,0.00009956039,0.000027968148,0.00029171898,0.00001452298,0.0002953228,0.000025089885,0.00016506355,0.0000033496697],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013714639,0.0001032595,0.74523336,0.00002243316,0.0005705811,0.0000057505404,0.0002893368,0.01064255,0.20999952,0.00047832687,0.00792127,0.024596464],"study_design_scores_gemma":[0.0091833,0.0005524625,0.60449916,0.0003467395,0.00025804294,0.0017691486,0.00018576707,0.025008976,0.35295907,0.0010543166,0.0032606935,0.00092232967],"about_ca_topic_score_codex":0.0000020621221,"about_ca_topic_score_gemma":5.5531086e-7,"teacher_disagreement_score":0.14295954,"about_ca_system_score_codex":0.00021112492,"about_ca_system_score_gemma":0.000051397867,"threshold_uncertainty_score":0.73631835},"labels":[],"label_agreement":null},{"id":"W2910316427","doi":"10.1109/epec.2018.8598460","title":"How to Improve Linear Fuel-Cost Function to Compete with Quadratic and Cubic Functions","year":2018,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Piecewise; Quadratic function; Polynomial; Cubic function; Piecewise linear function; Applied mathematics; Quadratic equation; Function (biology); Mathematical optimization; Mathematics; Linear programming; Computer science; Mathematical analysis","score_opus":0.005455024507742452,"score_gpt":0.1850551011650152,"score_spread":0.17960007665727273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2910316427","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025635418,0.000042447373,0.9646447,0.00032146875,0.0005803774,0.0006328809,0.0000045916745,0.00043228088,0.0077058915],"genre_scores_gemma":[0.98564816,0.000002520446,0.009583599,0.0001527509,0.00024942623,0.000085412474,0.000008589053,0.000038475515,0.0042310595],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99930984,0.000013210488,0.00012305097,0.00021114097,0.00012068229,0.00022209101],"domain_scores_gemma":[0.99946105,0.00002292436,0.000016622622,0.00022334045,0.00011851093,0.00015754989],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000061001116,0.0001428771,0.00013256806,0.00015685098,0.000072752344,0.000101611964,0.0000515787,0.000049215436,0.000044420307],"category_scores_gemma":[0.000022579563,0.00012085706,0.000013211605,0.0005195933,0.000012985874,0.00019579545,0.00001639948,0.000067851426,0.0002222738],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010245562,0.00030481073,0.007160265,0.00131278,0.0015061346,0.000021397167,0.008244625,0.31792817,0.39881253,0.006062298,0.15247245,0.10515],"study_design_scores_gemma":[0.0025380312,0.0067324787,0.00829472,0.00021122042,0.00026753423,0.000083096274,0.0014080167,0.81027585,0.024173342,0.00004401106,0.14408761,0.0018840566],"about_ca_topic_score_codex":0.000023238645,"about_ca_topic_score_gemma":0.00043412493,"teacher_disagreement_score":0.96001273,"about_ca_system_score_codex":0.000068511814,"about_ca_system_score_gemma":0.000014243574,"threshold_uncertainty_score":0.49284077},"labels":[],"label_agreement":null},{"id":"W2914259667","doi":"10.1016/j.rser.2019.109275","title":"Short-term electricity trading for system balancing: An empirical analysis of the role of intraday trading in balancing Germany's electricity system","year":2019,"lang":"en","type":"article","venue":"Renewable and Sustainable Energy Reviews","topic":"Electric Power System Optimization","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Term (time); Incentive; Quarter (Canadian coin); Electricity system; Work (physics); Electricity market; Wind power; Business; Economics; Microeconomics; Electricity generation; Engineering; Electrical engineering; Power (physics)","score_opus":0.007356296106826883,"score_gpt":0.2243196095912892,"score_spread":0.2169633134844623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2914259667","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87551117,0.037202086,0.0820645,0.0000051087895,0.00016217641,0.0015497475,0.000009293212,0.00014938874,0.003346553],"genre_scores_gemma":[0.99844325,0.0009734762,0.00017131043,0.0000062298736,0.000040708434,0.00011882533,0.000020430944,0.000045872788,0.00017991419],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99700254,0.00032466036,0.0012361931,0.0004286976,0.00026001944,0.00074791576],"domain_scores_gemma":[0.9987228,0.0001831523,0.00030882822,0.0005432631,0.00013562315,0.00010631597],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0018069495,0.00032699405,0.0015360597,0.000723324,0.00010540802,0.000045408076,0.0003197716,0.00019870495,0.000003406129],"category_scores_gemma":[0.00006221044,0.00026453668,0.00029966267,0.0035853365,0.000016540296,0.00030464155,0.000034767625,0.00014853776,1.1342202e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011988711,0.00020741794,0.20653889,0.026391786,0.0014506668,0.000017987672,0.0017682293,0.65777546,0.0762992,0.011308425,0.0003196068,0.01780242],"study_design_scores_gemma":[0.00029409927,0.00009072515,0.0012991327,0.00050800847,0.00049928,0.000015975691,0.0008022603,0.9778598,0.016697133,0.000023178702,0.0016127183,0.0002977102],"about_ca_topic_score_codex":0.00078292144,"about_ca_topic_score_gemma":0.00020443989,"teacher_disagreement_score":0.3200843,"about_ca_system_score_codex":0.0009254373,"about_ca_system_score_gemma":0.000106094616,"threshold_uncertainty_score":0.9999807},"labels":[],"label_agreement":null},{"id":"W2915257683","doi":"10.62986/dp2018.21","title":"Assessment of the Philippine Electric Power Industry Reform Act","year":2018,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"International Development Research Centre; Korea Electric Power Corporation; U.S. Department of Energy","keywords":"Restructuring; Repeal; Electric power industry; Competition (biology); Electricity; Business; Mains electricity; Quality (philosophy); Service (business); Distribution (mathematics); Economics; Industrial organization; Power (physics); Market economy; Public economics; Economic policy; Marketing; Finance; Political science; Engineering","score_opus":0.008485963978570541,"score_gpt":0.24406079994698315,"score_spread":0.2355748359684126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2915257683","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20629077,0.0005172333,0.04649649,0.00019630844,0.0040585804,0.0013536141,0.000019688378,0.0007572909,0.74031],"genre_scores_gemma":[0.9968222,0.000054622837,0.0012052719,0.000029713216,0.0001420327,0.000041678883,0.000013535805,0.000060927956,0.0016300628],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99850994,0.000046125806,0.0004996489,0.0002609594,0.0003894934,0.0002938046],"domain_scores_gemma":[0.9986127,0.000020417468,0.00018697513,0.0009782048,0.00015004161,0.00005165793],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003094974,0.00028868555,0.00035917008,0.00018890035,0.0000336449,0.000031606243,0.00061386055,0.00083106,0.0006264365],"category_scores_gemma":[0.000027023834,0.00019976335,0.00013725525,0.0005411839,0.00002052354,0.00005956687,0.0002954315,0.0013191985,0.000009488226],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028966671,0.0006668701,0.03302279,0.0044112024,0.0032323827,0.00001225519,0.0009811092,0.85046005,0.027751876,0.007588347,0.06204012,0.009804001],"study_design_scores_gemma":[0.00084962306,0.00025464888,0.14099906,0.0010037755,0.00024641972,0.00004277495,0.00004980916,0.8001112,0.049190752,0.0005567937,0.005103962,0.0015911874],"about_ca_topic_score_codex":0.0000485049,"about_ca_topic_score_gemma":0.000009708293,"teacher_disagreement_score":0.7905314,"about_ca_system_score_codex":0.00092163775,"about_ca_system_score_gemma":0.00024181009,"threshold_uncertainty_score":0.8146113},"labels":[],"label_agreement":null},{"id":"W2925133149","doi":"10.5547/01956574.40.4.asid","title":"Merchant Storage Investment in a Restructured Electricity Industry","year":2019,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Social Sciences and Humanities Research Council of Canada; HEC Montréal; Universitetet i Oslo; Aalto-Yliopisto; University of Guelph","keywords":"Profit (economics); Restructuring; Microeconomics; Electricity; Electricity market; Energy storage; Economics; Business; Social Welfare; Investment (military); Industrial organization; Environmental economics; Finance; Power (physics); Electrical engineering; Engineering","score_opus":0.004821282474285495,"score_gpt":0.1824414710785164,"score_spread":0.17762018860423093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2925133149","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98009586,0.0015001777,0.01108737,0.00014806126,0.0009131532,0.000104762206,6.842669e-7,0.000080042184,0.006069883],"genre_scores_gemma":[0.9990198,0.00010191547,0.0001570146,0.00015301048,0.00014460976,0.000005176045,0.0000011987742,0.000024185565,0.00039308213],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990763,0.0001238638,0.00023840442,0.000082388004,0.00020570194,0.00027331253],"domain_scores_gemma":[0.9996428,0.000028441542,0.000060990365,0.00017950787,0.000022648524,0.00006559767],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034107355,0.00011541052,0.00013989728,0.00017073141,0.000044450844,0.00004021241,0.00022221195,0.00014427096,0.000070798946],"category_scores_gemma":[0.00001706577,0.00008203784,0.000033159275,0.00043322908,0.0000081058,0.00010434257,0.000016609009,0.000733887,0.000008620315],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016200498,0.000015351025,0.0009787376,0.000009394816,0.000058704074,0.000032581764,0.00060315395,0.9818431,0.009400191,0.0029352254,0.0024530613,0.0016542769],"study_design_scores_gemma":[0.0030873998,0.00025604252,0.022113835,0.00028376296,0.000049273727,0.0017136515,0.00027611537,0.9222528,0.031051405,0.005978167,0.0120115625,0.00092599273],"about_ca_topic_score_codex":0.000031731935,"about_ca_topic_score_gemma":0.000022370974,"teacher_disagreement_score":0.05959033,"about_ca_system_score_codex":0.00030740115,"about_ca_system_score_gemma":0.000054407403,"threshold_uncertainty_score":0.3345406},"labels":[],"label_agreement":null},{"id":"W2929089835","doi":"10.1109/jsyst.2019.2903555","title":"Optimal Planning With Technology Selection for Wind Power Plants in Power Distribution Networks","year":2019,"lang":"en","type":"article","venue":"IEEE Systems Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Time horizon; Wind power; Selection (genetic algorithm); Engineering; Net present value; Operations research; Plan (archaeology); Site selection; Investment (military); Electric power system; Mathematical optimization; Work (physics); Power (physics); Computer science; Production (economics); Economics; Mathematics","score_opus":0.004115305147500938,"score_gpt":0.19933647169034283,"score_spread":0.19522116654284188,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2929089835","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4941339,0.0005820649,0.5026666,0.000009261732,0.0018167085,0.00044895447,0.0000067033643,0.00012621432,0.00020961104],"genre_scores_gemma":[0.9993172,0.000010984826,0.00032235295,0.0000031119484,0.00016533418,0.00002514272,0.000016126027,0.000050699156,0.000089040135],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99863124,0.00004409329,0.00045167602,0.00018545368,0.00019987587,0.00048764652],"domain_scores_gemma":[0.9994784,0.00004473813,0.0001665314,0.00012397014,0.00011675692,0.00006962558],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043192453,0.00019960856,0.00031173695,0.0003394555,0.00008141111,0.00010054969,0.00013629823,0.0002770725,0.0000073771093],"category_scores_gemma":[0.000011888659,0.00018045687,0.000038477974,0.00048468882,0.000010620094,0.00028046427,0.000005270421,0.00047351967,0.000010541927],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000072582174,0.000012159265,0.017482521,0.000032189353,0.00006304575,0.000012141015,0.00009808016,0.97994745,0.00088866754,0.000034864886,0.0013165034,0.00003980925],"study_design_scores_gemma":[0.001831872,0.00052571937,0.0015615108,0.0006516693,0.000015544987,0.002863998,0.00022653528,0.98929304,0.0005967778,0.000006394133,0.0020546406,0.0003723263],"about_ca_topic_score_codex":0.0000045627826,"about_ca_topic_score_gemma":0.000002914745,"teacher_disagreement_score":0.5051833,"about_ca_system_score_codex":0.00045663712,"about_ca_system_score_gemma":0.000046246863,"threshold_uncertainty_score":0.7358818},"labels":[],"label_agreement":null},{"id":"W2942309913","doi":"10.1051/ro/2019043","title":"A Non-Linear-Threshold-Accepting Function Based Algorithm for the Solution of Economic Dispatch Problem","year":2019,"lang":"en","type":"article","venue":"RAIRO - Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Mathematical optimization; Economic dispatch; Computer science; Harmony search; Benchmark (surveying); Heuristics; Heuristic; Electric power system; Algorithm; Power (physics); Mathematics","score_opus":0.029269800762894614,"score_gpt":0.30914104292080496,"score_spread":0.27987124215791037,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2942309913","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020453306,0.00017314915,0.9750417,0.00021728927,0.00034330614,0.0022894444,0.000026908592,0.000087203334,0.0013676898],"genre_scores_gemma":[0.9684206,0.000032812924,0.029317588,0.000008850231,0.00017782209,0.00073063973,0.00010724993,0.00005160275,0.0011528269],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987699,0.000054454256,0.0003444859,0.00021782148,0.00026238515,0.0003509592],"domain_scores_gemma":[0.999083,0.00021998101,0.000022672764,0.00036239592,0.00026875775,0.000043183096],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001208946,0.00011413232,0.00015550929,0.000213652,0.00028142164,0.00008893626,0.00021322578,0.00009503516,0.00015414543],"category_scores_gemma":[0.000028243312,0.000096648044,0.00006631068,0.0003705758,0.000034095043,0.00027603097,0.000031772768,0.0002238778,0.0001501447],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011539169,0.000023116067,0.0002288429,0.000084921194,0.000036463858,5.9310178e-8,0.00011764165,0.97417074,0.0064922017,0.0002187642,0.0012927746,0.017322954],"study_design_scores_gemma":[0.0005322413,0.00014013333,0.0002628528,0.00003574411,0.000010396419,8.214149e-7,0.00006870487,0.9937468,0.004323912,0.000014374048,0.0007634997,0.00010050818],"about_ca_topic_score_codex":0.00014890466,"about_ca_topic_score_gemma":0.00018217812,"teacher_disagreement_score":0.9479673,"about_ca_system_score_codex":0.00028904655,"about_ca_system_score_gemma":0.00017888202,"threshold_uncertainty_score":0.3941193},"labels":[],"label_agreement":null},{"id":"W2945101307","doi":"10.1109/tsg.2019.2918258","title":"Tracing Power With Circuit Theory","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Smart Grid","topic":"Electric Power System Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; National Science Foundation","keywords":"Tracing; Scalability; Computer science; Network topology; Generator (circuit theory); Power (physics); Electric power system; AC power; Distributed computing; Mathematical optimization; Topology (electrical circuits); Electronic engineering; Engineering; Electrical engineering; Mathematics; Computer network","score_opus":0.0049849590426283424,"score_gpt":0.17116982138278153,"score_spread":0.16618486234015317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2945101307","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05766703,0.000052413336,0.9179035,0.000011504065,0.002031981,0.00029219693,0.000011895799,0.0005274709,0.021502014],"genre_scores_gemma":[0.9983401,0.000010344191,0.00022954537,0.00004553632,0.000036885616,0.00003537038,0.0000023634686,0.00006345294,0.0012364062],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991429,0.000037046157,0.00017718588,0.00019579598,0.00019332147,0.00025375353],"domain_scores_gemma":[0.9994833,0.000081274135,0.000022747145,0.00031367684,0.000034001274,0.00006502709],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014547513,0.0001724671,0.00016807941,0.00017428439,0.00006324983,0.000032482174,0.00010153682,0.00008374931,0.00046758208],"category_scores_gemma":[9.1364984e-7,0.00015866381,0.00006027954,0.00034316568,0.0000135144355,0.00020820777,1.85537e-7,0.00024411628,0.00054679206],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050800656,0.000060626113,0.00008495345,0.00006241969,0.00015275062,0.00000695363,0.00058826245,0.99143076,0.0031951414,0.00024305271,0.0003282604,0.003796043],"study_design_scores_gemma":[0.011144776,0.0035232855,0.0034138449,0.0016615978,0.00074458844,0.0010238294,0.0014154156,0.2927746,0.65229607,0.0007268998,0.025269058,0.0060060336],"about_ca_topic_score_codex":0.000005096244,"about_ca_topic_score_gemma":0.000010860054,"teacher_disagreement_score":0.94067305,"about_ca_system_score_codex":0.000106252235,"about_ca_system_score_gemma":0.000021906573,"threshold_uncertainty_score":0.7028088},"labels":[],"label_agreement":null},{"id":"W2945323006","doi":"10.1016/j.dib.2019.104034","title":"Observed switches and derived profitability indicators for peaking power plants: Northeast U.S. 2001–2009","year":2019,"lang":"en","type":"article","venue":"Data in Brief","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Norges Forskningsråd; Réseau de cancérologie Rossy; Technische Universität Chemnitz","keywords":"Profitability index; Power (physics); Research article; Computer science; Environmental science; Agricultural engineering; Business; Physics; Engineering; Finance; Thermodynamics","score_opus":0.02429771943391006,"score_gpt":0.23145719261489103,"score_spread":0.20715947318098096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2945323006","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9912422,0.00051111286,0.006009396,0.00003929552,0.00025041657,0.0008732353,0.00058505795,0.00013842179,0.00035091757],"genre_scores_gemma":[0.9971418,0.000031810912,0.0018384318,0.000027370821,0.000021543492,0.00003522012,0.0008602146,0.000032004453,0.000011596443],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9989497,0.000022662754,0.00028010638,0.00033421718,0.000114554474,0.00029876424],"domain_scores_gemma":[0.9991138,0.000092355825,0.00005392036,0.0006661134,0.000017358629,0.00005643816],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000432392,0.00014055542,0.00021379035,0.00011661575,0.000027678094,0.0000434389,0.0003184591,0.00009140389,0.000024198514],"category_scores_gemma":[0.0001245769,0.00014651587,0.00001407901,0.00021856943,0.000015397574,0.00042717523,0.00009356265,0.000109872046,0.000009410057],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007073852,0.00007834763,0.98506683,0.00058693613,0.00008033057,0.000003733305,0.0007811962,0.0018518862,0.0038976604,0.00007911098,0.0029080017,0.0045952196],"study_design_scores_gemma":[0.002273723,0.00010474606,0.83035636,0.00025681686,0.000025563777,0.000021267477,0.0002571835,0.15077546,0.0018222107,0.000056269888,0.0133129405,0.00073744106],"about_ca_topic_score_codex":0.0000796323,"about_ca_topic_score_gemma":0.00017211688,"teacher_disagreement_score":0.15471047,"about_ca_system_score_codex":0.0000622419,"about_ca_system_score_gemma":0.000029662575,"threshold_uncertainty_score":0.5974744},"labels":[],"label_agreement":null},{"id":"W2953193713","doi":"10.48550/arxiv.1510.08335","title":"A Stochastic Electricity Market Clearing Formulation with Consistent Pricing Properties","year":2015,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Booth University College","funders":"","keywords":"Clearing; Market clearing; Economics; Bounded function; Diversification (marketing strategy); Quantile; Mathematical optimization; Econometrics; Mathematical economics; Microeconomics; Mathematics; Finance","score_opus":0.0487441980514783,"score_gpt":0.15104653881519817,"score_spread":0.10230234076371986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953193713","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37965184,0.00019649841,0.612945,0.000004828467,0.00020747283,0.00067775627,0.0000041430335,0.00061549223,0.0056969346],"genre_scores_gemma":[0.99878055,0.000032865908,0.00032712164,0.000006314887,0.000047506226,0.000003845325,0.000017576223,0.00006857339,0.00071567117],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986749,0.000073816955,0.00023525547,0.0004997975,0.00013077301,0.00038542986],"domain_scores_gemma":[0.998951,0.000041609575,0.00015488747,0.00045539488,0.00026539192,0.00013170172],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025179595,0.0003484332,0.00037058833,0.00034726108,0.00009175731,0.00007729841,0.00027669227,0.00024833423,0.000010885032],"category_scores_gemma":[0.00004665277,0.00035978245,0.00007406791,0.0005879314,0.00002891059,0.000249253,0.00016663155,0.0005022293,0.000014708559],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009690122,0.000018726545,0.0005723322,0.00025704084,0.00015305902,0.000026903412,0.00018702683,0.99787545,0.00005869461,0.00045613913,0.00019994062,0.000097772805],"study_design_scores_gemma":[0.0004891888,0.000067618595,0.00030975015,0.0003370405,0.00016666033,0.000013478591,0.00006200522,0.99763274,0.00013339364,0.00031818336,0.000023032659,0.00044692494],"about_ca_topic_score_codex":0.00009148506,"about_ca_topic_score_gemma":0.000061029732,"teacher_disagreement_score":0.61912864,"about_ca_system_score_codex":0.0010726284,"about_ca_system_score_gemma":0.00018185504,"threshold_uncertainty_score":0.99988544},"labels":[],"label_agreement":null},{"id":"W2955540607","doi":"10.1109/tpwrs.2019.2926410","title":"Short-Circuit Constrained Power System Expansion Planning Considering Bundling and Voltage Levels of Lines","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Linearization; Electric power transmission; Electric power system; Time horizon; Voltage; Mathematical optimization; Transmission line; Control theory (sociology); Representation (politics); Integer (computer science); Engineering; Nonlinear system; Integer programming; Power (physics); Computer science; Electrical engineering; Mathematics; Control (management)","score_opus":0.018735337284884603,"score_gpt":0.21952922202782985,"score_spread":0.20079388474294524,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955540607","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22868985,0.00069579115,0.7627427,0.0000027321364,0.003531937,0.0007416004,0.000083141975,0.0005638431,0.0029484073],"genre_scores_gemma":[0.99943167,0.000011550993,0.00017186406,0.000005359909,0.000016104594,0.000067646615,0.0000027631515,0.00010051949,0.00019254984],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99783117,0.00007715595,0.0008789873,0.00040801402,0.0003880057,0.00041665195],"domain_scores_gemma":[0.9988772,0.00025002682,0.00012753971,0.00046105654,0.00014460392,0.00013952547],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00039095333,0.00038179997,0.00066691934,0.00046025173,0.00010784026,0.00009038007,0.00014888299,0.00026427335,0.000037096215],"category_scores_gemma":[0.0000066122043,0.00039999603,0.0001124486,0.00038396457,0.000046602447,0.0003056058,0.0000020007137,0.00030296316,0.00003068524],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000356693,0.000050301824,0.00041331167,0.0016090184,0.0003209136,0.000028303308,0.002230921,0.87444323,0.12009027,0.00042327642,0.00005776308,0.00029699554],"study_design_scores_gemma":[0.0034500726,0.0009348263,0.0007298112,0.009635765,0.0002885764,0.0013362224,0.010915669,0.83354557,0.13603437,0.000009214547,0.00076188426,0.0023580475],"about_ca_topic_score_codex":0.000025051195,"about_ca_topic_score_gemma":0.0000018708486,"teacher_disagreement_score":0.7707418,"about_ca_system_score_codex":0.00017971551,"about_ca_system_score_gemma":0.000046907913,"threshold_uncertainty_score":0.9998452},"labels":[],"label_agreement":null},{"id":"W2955874576","doi":"10.1016/j.enpol.2019.05.041","title":"The profitability of onshore wind and solar PV power projects in China - A comparative study","year":2019,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":61,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Institute of Aging; National Natural Science Foundation of China; National Key Research and Development Program of China; National Development and Reform Commission; Florida Institute of Technology; University of San Diego","keywords":"Renewable energy; Cost of electricity by source; Profitability index; Revenue; Wind power; Carbon price; Natural resource economics; Feed-in tariff; Business; Environmental economics; Economics; Electricity generation; Environmental science; Greenhouse gas; Finance; Energy policy; Power (physics); Engineering","score_opus":0.007529807654059703,"score_gpt":0.23836249990346092,"score_spread":0.23083269224940123,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955874576","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9898882,0.00023269076,0.00013224255,0.000043100266,0.000068029614,0.00044764482,0.000002106423,0.00003791023,0.00914806],"genre_scores_gemma":[0.9996962,0.000010549768,0.00003712184,0.0000047515596,0.000019839705,0.000024612165,0.0000014854108,0.000012935053,0.00019252177],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99925375,0.000106984924,0.00021020051,0.00013343782,0.0001121232,0.00018353008],"domain_scores_gemma":[0.9996017,0.000063954314,0.00003933077,0.000242943,0.00002456953,0.00002745931],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021135862,0.00010790163,0.00019164833,0.000116290365,0.000029429326,0.000016935848,0.00010082427,0.00004152386,0.00000331379],"category_scores_gemma":[0.00003577251,0.00008023762,0.00001677479,0.00042736877,0.000026113916,0.00008424784,0.000031148757,0.000089963396,0.0000019351853],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018675115,0.0008640232,0.620605,0.00029635133,0.00043964395,0.000007102781,0.10623051,0.22968979,0.0024424964,0.036052767,0.0007580982,0.0024274692],"study_design_scores_gemma":[0.00217347,0.00081898406,0.8989311,0.000088282555,0.00001700854,0.000008861403,0.0036061415,0.08709361,0.005323701,0.00046635134,0.0010080548,0.00046444542],"about_ca_topic_score_codex":0.00067315664,"about_ca_topic_score_gemma":0.0002816942,"teacher_disagreement_score":0.2783261,"about_ca_system_score_codex":0.000081642196,"about_ca_system_score_gemma":0.000056190263,"threshold_uncertainty_score":0.32719952},"labels":[],"label_agreement":null},{"id":"W2956905953","doi":"10.1016/j.enpol.2019.06.046","title":"Potential benefits of optimal intra-day electricity hedging for the environment: The perspective of electricity retailers","year":2019,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Electricity; Electricity market; Volatility (finance); Business; Electricity retailing; Context (archaeology); Electricity generation; Efficient energy use; Environmental economics; Industrial organization; Natural resource economics; Economics; Finance; Power (physics); Engineering","score_opus":0.004252350394112601,"score_gpt":0.18977301869092622,"score_spread":0.18552066829681363,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956905953","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2708738,0.006920724,0.70974666,0.0008576659,0.00045434915,0.001214328,0.000058855494,0.00019497788,0.009678621],"genre_scores_gemma":[0.99869096,0.00044141285,0.0002922841,0.00003872918,0.00019633939,0.000041691455,0.000005976611,0.00004368788,0.00024894293],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99875134,0.00007558185,0.0003300256,0.00020102857,0.0002497268,0.00039230403],"domain_scores_gemma":[0.99905366,0.00028040496,0.00016007049,0.00039174655,0.000076498414,0.000037598118],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033051535,0.00018822451,0.0002645788,0.00019531816,0.00008755716,0.000015747946,0.00037118833,0.00010079016,0.000023879982],"category_scores_gemma":[0.00009912667,0.00013433432,0.00014866379,0.000630889,0.00005175575,0.0000978746,0.00003461395,0.0001482159,0.0000031732193],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021500471,0.000020857142,0.00005036349,0.00002012763,0.00016933914,1.0444716e-7,0.0005251222,0.92408204,0.01212834,0.059965543,0.00016476287,0.0028519065],"study_design_scores_gemma":[0.00064827775,0.00021067668,0.0014470642,0.000021680633,0.00010136699,0.000007596832,0.00015903873,0.8438659,0.15176775,0.00057385484,0.00093478063,0.00026206157],"about_ca_topic_score_codex":0.0005385173,"about_ca_topic_score_gemma":0.000008636591,"teacher_disagreement_score":0.7278171,"about_ca_system_score_codex":0.0002954251,"about_ca_system_score_gemma":0.000068242254,"threshold_uncertainty_score":0.5477994},"labels":[],"label_agreement":null},{"id":"W2959167103","doi":"","title":"Transition to a Capacity Auction: a Case Study of Ireland","year":2019,"lang":"en","type":"article","venue":"Arrow@dit (Dublin Institute of Technology)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Order (exchange); Electricity; Investment (military); Revenue; Economics; Marginal cost; Electricity market; Quarter (Canadian coin); Microeconomics; Market economy; Business; Finance","score_opus":0.009406681291129591,"score_gpt":0.2076801616621799,"score_spread":0.1982734803710503,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2959167103","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9740672,0.00007197397,0.022737652,0.00013900695,0.0010276085,0.00092191744,0.000010041394,0.00047782762,0.0005467514],"genre_scores_gemma":[0.99674934,0.0000074058494,0.0030897888,0.0000071837158,0.00002817461,0.000060898714,0.000004309879,0.000023348484,0.000029572951],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998874,0.000015187526,0.0004792359,0.00024657592,0.00018293846,0.00020202485],"domain_scores_gemma":[0.99918294,0.000011022901,0.00009718693,0.0005161756,0.00014610615,0.00004654378],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017180503,0.00016967751,0.00035750977,0.00086513953,0.000040626895,0.000008618422,0.00021195151,0.00024353895,0.000020338304],"category_scores_gemma":[0.000040973726,0.00018237007,0.000048096837,0.0015300133,0.00005298977,0.00030209412,0.000026381396,0.00021060655,0.000026989706],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000098777906,0.0011319013,0.005759426,0.00092697627,0.00064066605,0.00059858494,0.0065511167,0.924514,0.046888765,0.0036871063,0.001707337,0.0074953493],"study_design_scores_gemma":[0.032316916,0.01607055,0.0026977812,0.00253658,0.0013251823,0.020367384,0.027185995,0.46636385,0.38761044,0.0020179206,0.03608305,0.005424354],"about_ca_topic_score_codex":0.00023317999,"about_ca_topic_score_gemma":0.0003472256,"teacher_disagreement_score":0.45815015,"about_ca_system_score_codex":0.00009280405,"about_ca_system_score_gemma":0.00002741597,"threshold_uncertainty_score":0.7436836},"labels":[],"label_agreement":null},{"id":"W2963155848","doi":"10.48550/arxiv.1704.02556","title":"Management of Cascading Outage Risk Based on Risk Gradient and Markovian Tree Search","year":2017,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cascading failure; Computer science; Risk management; Electric power system; Convergence (economics); Linearization; Mathematical optimization; Reliability engineering; Tree (set theory); Reduction (mathematics); Power (physics); Engineering; Mathematics; Nonlinear system","score_opus":0.030279163751816652,"score_gpt":0.17191100670057607,"score_spread":0.1416318429487594,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2963155848","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6696337,0.00016447337,0.30133876,0.000007010741,0.00048381658,0.0007087987,0.00011896391,0.00022328483,0.027321214],"genre_scores_gemma":[0.9968852,0.001643888,0.00068928895,0.0000017938426,0.000022936181,0.0000015954738,0.000021244485,0.00004626371,0.0006878132],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99864864,0.00014426466,0.00020358223,0.0005735616,0.000119019795,0.0003109169],"domain_scores_gemma":[0.9985104,0.00008131427,0.00023225864,0.000992034,0.000054083263,0.00012991675],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00044163052,0.0003009767,0.0003519311,0.0004447706,0.00015857333,0.00005235135,0.00047825888,0.00021713764,0.000013782308],"category_scores_gemma":[0.000018034314,0.00036288812,0.00012943974,0.00019692375,0.00006021738,0.0000865506,0.00027061562,0.0005404292,0.000010713752],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004194277,0.000031150063,0.017681958,0.0005743848,0.0002635309,0.00020514014,0.000116508534,0.9777198,0.0000035096887,0.000834897,0.000060551873,0.0024666598],"study_design_scores_gemma":[0.0006837297,0.000056006393,0.014127952,0.00040701937,0.00028110624,9.3029945e-7,0.00006260882,0.98358274,0.0001203013,0.0002812507,0.00007245456,0.00032393067],"about_ca_topic_score_codex":0.000298296,"about_ca_topic_score_gemma":0.00006510793,"teacher_disagreement_score":0.3272515,"about_ca_system_score_codex":0.00033783523,"about_ca_system_score_gemma":0.000023398117,"threshold_uncertainty_score":0.9998823},"labels":[],"label_agreement":null},{"id":"W2963427521","doi":"10.1016/j.ejor.2018.10.035","title":"Power transmission network expansion planning: A semidefinite programming branch-and-bound approach","year":2018,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Semidefinite programming; Branch and bound; Mathematical optimization; Integer programming; Node (physics); Computer science; Linear programming relaxation; Relaxation (psychology); Transmission (telecommunications); Tree (set theory); Integer (computer science); Network planning and design; Upper and lower bounds; Search tree; Mathematics; Search algorithm","score_opus":0.047010121484510725,"score_gpt":0.30601575257613706,"score_spread":0.25900563109162633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2963427521","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20353206,0.0059450977,0.7166539,0.00028619403,0.00046917805,0.00044257453,0.0000017358783,0.0000954212,0.07257387],"genre_scores_gemma":[0.9760111,0.00010329469,0.022820398,0.000027039563,0.000733891,0.0000027654776,0.000006368327,0.000053450578,0.0002416917],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975697,0.0006267221,0.00048794356,0.00015637488,0.00079449837,0.00036475965],"domain_scores_gemma":[0.99885106,0.00014646217,0.00005919771,0.00012215917,0.0006335093,0.00018762807],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044513694,0.00012739863,0.00016755353,0.00025265658,0.00032199628,0.00025642736,0.00021944805,0.00003906543,0.000068457266],"category_scores_gemma":[0.00014162879,0.00010692739,0.000045051613,0.0004771899,0.000097101976,0.00034162105,0.00003536142,0.0005327381,0.00003209734],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00095803494,0.00039558677,0.0034712465,0.00038911126,0.0005164685,0.00052101637,0.019783152,0.6990486,0.054428052,0.004013852,0.091857724,0.12461715],"study_design_scores_gemma":[0.0057168896,0.005937508,0.023254458,0.0028012826,0.000061131206,0.0032469924,0.0008486776,0.5015382,0.0045979167,0.0004910744,0.45009407,0.001411767],"about_ca_topic_score_codex":6.07366e-7,"about_ca_topic_score_gemma":8.944223e-8,"teacher_disagreement_score":0.77247906,"about_ca_system_score_codex":0.00007199153,"about_ca_system_score_gemma":0.000099029436,"threshold_uncertainty_score":0.43603724},"labels":[],"label_agreement":null},{"id":"W2965657807","doi":"10.11159/eee19.120","title":"Optimal Operation of GENCOs in Competitive Electricity Markets","year":2019,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Electrical Engineering and Computer Systems and Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Electricity; Computer science; Engineering; Electrical engineering","score_opus":0.0031368940181988355,"score_gpt":0.17655557797109725,"score_spread":0.17341868395289842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2965657807","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.995446,0.0004321432,0.002018613,0.000015569582,0.0006619384,0.00039068714,0.000001006061,0.000049896833,0.0009841197],"genre_scores_gemma":[0.99937254,0.00003601682,0.0004571203,0.000004871092,0.000028419636,0.000010599609,1.202451e-7,0.000009756941,0.000080530954],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989626,0.000006572592,0.00029120067,0.00022436255,0.00027412947,0.00024116889],"domain_scores_gemma":[0.99961025,0.00007279049,0.00007434401,0.00007572427,0.00011441269,0.00005250653],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039864,0.00013372979,0.00026813347,0.00039099148,0.000035916823,0.000070448434,0.00024503106,0.000037533122,5.955808e-7],"category_scores_gemma":[0.000022658152,0.000105553074,0.00002212783,0.0012395687,0.000047047804,0.00019124168,0.00005069061,0.00016515508,3.2885345e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047125384,0.00006424396,0.018803746,0.0008265832,0.00003795476,8.73051e-7,0.0002704193,0.8559338,0.05542471,0.06599453,0.00015706792,0.002438937],"study_design_scores_gemma":[0.00022206518,0.00009097282,0.009408271,0.0002658086,0.0000037578925,0.000012017658,0.0000052284586,0.9784692,0.011338065,0.0000026630628,0.00006762184,0.000114325274],"about_ca_topic_score_codex":0.0000089900805,"about_ca_topic_score_gemma":7.5161006e-7,"teacher_disagreement_score":0.12253539,"about_ca_system_score_codex":0.0000695563,"about_ca_system_score_gemma":0.000020534477,"threshold_uncertainty_score":0.43043295},"labels":[],"label_agreement":null},{"id":"W2972342334","doi":"10.1109/tpwrs.2019.2940288","title":"A Generic Convex Model for a Chance-Constrained Look-Ahead Economic Dispatch Problem Incorporating an Efficient Wind Power Distribution Modeling","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Wind power; Economic dispatch; Electric power system; Computer science; Linear programming; Cumulative distribution function; Convex optimization; Probability density function; Scheduling (production processes); Piecewise; Integer programming; Power (physics); Mathematics; Regular polygon; Engineering","score_opus":0.011837105205935256,"score_gpt":0.2084447719713819,"score_spread":0.19660766676544664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2972342334","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15862957,0.000092433176,0.835392,0.000014663129,0.0023425592,0.0022571525,0.00042501927,0.0005128019,0.00033383875],"genre_scores_gemma":[0.99718726,0.000006463397,0.0018635523,0.000012026709,0.000029785855,0.00044439506,0.00009974698,0.0001370584,0.0002196943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975573,0.000069920265,0.00086943724,0.0006294626,0.0002717243,0.0006021943],"domain_scores_gemma":[0.9988482,0.000057692738,0.00018512284,0.0005713672,0.00014535266,0.00019228313],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00045344545,0.0004561907,0.0005623264,0.0002337074,0.00019378548,0.00016184911,0.00023824054,0.0002776936,0.000019241426],"category_scores_gemma":[0.0000019592119,0.00049316086,0.00017888115,0.0002828009,0.000026693657,0.00039381615,0.0000017525946,0.0002683462,0.00009331904],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004705894,0.000087652705,0.000011197126,0.00019396654,0.00009053792,8.192485e-7,0.0007694115,0.99580586,0.002540677,0.00033872685,0.0000411187,0.000072995215],"study_design_scores_gemma":[0.0010547937,0.00023628559,0.0000014183179,0.00019605062,0.00004546115,0.000026211206,0.00026553447,0.9966865,0.00090922223,0.000019442301,0.000026535878,0.00053251215],"about_ca_topic_score_codex":0.000062365245,"about_ca_topic_score_gemma":0.000026640528,"teacher_disagreement_score":0.8385577,"about_ca_system_score_codex":0.0008186398,"about_ca_system_score_gemma":0.00015661532,"threshold_uncertainty_score":0.999752},"labels":[],"label_agreement":null},{"id":"W2972394739","doi":"10.2139/ssrn.3452741","title":"Pricing Reliability Options Under Different Electricity Prices’ Regimes","year":2019,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Università degli Studi di Padova","keywords":"Electricity; Volatility (finance); Electricity market; Reliability (semiconductor); Remuneration; Electricity price; Economics; Electricity price forecasting; Mean reversion; Econometrics; Value (mathematics); Electricity pricing; Microeconomics; Power (physics); Computer science; Engineering; Finance; Electrical engineering","score_opus":0.006936180240424171,"score_gpt":0.21821791337744412,"score_spread":0.21128173313701995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2972394739","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18495928,0.0151797095,0.79135543,0.00026632275,0.0024666144,0.0010915383,0.000008802501,0.00074896653,0.003923365],"genre_scores_gemma":[0.9608891,0.036037352,0.00054697075,0.000027851273,0.0005674037,0.000057110126,0.00005099726,0.00018921617,0.0016339843],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99358946,0.0002525352,0.0010484464,0.00069149426,0.0007350851,0.0036829486],"domain_scores_gemma":[0.99789184,0.00022011511,0.00050731876,0.0009830327,0.00021440646,0.00018330272],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0020337554,0.0007607694,0.0009070267,0.0005783967,0.00023784125,0.0002443476,0.00092439656,0.0007139873,0.000027882983],"category_scores_gemma":[0.0001514309,0.0007179583,0.00043428957,0.000534546,0.000034470282,0.00027776827,0.00023110729,0.009200346,0.00006483912],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032506126,0.0001642999,0.0009921287,0.0003387219,0.0009448921,0.0000027957046,0.00017835501,0.9758598,0.00036188037,0.017872395,0.00044218707,0.0028099979],"study_design_scores_gemma":[0.0025111372,0.00093918195,0.0043477854,0.00093482924,0.0010794615,0.0012477182,0.0006307558,0.5819601,0.0021412726,0.3980725,0.0020798417,0.0040554255],"about_ca_topic_score_codex":0.00005655382,"about_ca_topic_score_gemma":0.00012317652,"teacher_disagreement_score":0.79080844,"about_ca_system_score_codex":0.009912857,"about_ca_system_score_gemma":0.0024662446,"threshold_uncertainty_score":0.99952716},"labels":[],"label_agreement":null},{"id":"W2972415397","doi":"10.2139/ssrn.3538503","title":"Heterogeneous Passthrough from TFP to Wages","year":2020,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University; University of Toronto","funders":"","keywords":"Total factor productivity; Economics; Labour economics; Productivity; Macroeconomics","score_opus":0.006573148604670896,"score_gpt":0.19026379331628368,"score_spread":0.18369064471161278,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2972415397","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24130662,0.010744231,0.7431132,0.0022825839,0.00061371113,0.00026552344,0.00000987073,0.0005630015,0.0011012643],"genre_scores_gemma":[0.9967435,0.0014308031,0.0007347145,0.00031493322,0.0005918896,0.0000072211537,0.000005509422,0.000066036664,0.0001053843],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977158,0.000044435314,0.00029120114,0.00018564171,0.00022973272,0.001533236],"domain_scores_gemma":[0.9995506,0.000027356178,0.0000454054,0.00013891443,0.000040302522,0.00019743745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020148307,0.00018404592,0.00021034847,0.00006196641,0.000076915545,0.000072335715,0.00028788907,0.00007851189,0.00005294871],"category_scores_gemma":[0.000043393728,0.0001856278,0.00008162479,0.00031734386,0.0000058362825,0.00014733333,0.000023285307,0.00091914565,0.00024216266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012725785,0.00005947104,0.0013433237,0.00004399786,0.0014853661,0.00010419192,0.004402074,0.87222064,0.021076014,0.006218487,0.010097686,0.082821496],"study_design_scores_gemma":[0.009126459,0.006604534,0.0011749952,0.0003296719,0.0006413757,0.0043341597,0.0035151064,0.5440476,0.0869017,0.12695311,0.20959966,0.006771646],"about_ca_topic_score_codex":0.000034834044,"about_ca_topic_score_gemma":0.00017444801,"teacher_disagreement_score":0.7554369,"about_ca_system_score_codex":0.00069817575,"about_ca_system_score_gemma":0.00023622373,"threshold_uncertainty_score":0.75696814},"labels":[],"label_agreement":null},{"id":"W2974254200","doi":"10.1109/access.2019.2942178","title":"Data-Driven Distributionally Robust Chance-Constrained Unit Commitment With Uncertain Wind Power","year":2019,"lang":"en","type":"article","venue":"IEEE Access","topic":"Electric Power System Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Robust optimization; Power system simulation; Mathematical optimization; Computer science; Wind power; Electric power system; Ambiguity; Stochastic programming; Economic dispatch; Stochastic optimization; Optimization problem; Power (physics); Engineering; Mathematics","score_opus":0.03582488586126701,"score_gpt":0.263093604504024,"score_spread":0.22726871864275702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2974254200","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.51524174,0.00026578482,0.4623518,0.00028893453,0.0017126505,0.0015867845,0.001129899,0.00074164965,0.01668078],"genre_scores_gemma":[0.99796396,0.000013776235,0.00082953606,0.0000511043,0.00006564066,0.000018640461,0.00079573324,0.000038302875,0.00022328536],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988427,0.000031960957,0.0002311101,0.0002935574,0.00028541955,0.00031523377],"domain_scores_gemma":[0.9989963,0.00006012649,0.00006876481,0.0007012291,0.0000952552,0.000078295685],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013777225,0.00019925505,0.00021838212,0.00008120715,0.000052009436,0.00012735576,0.0008004049,0.00007801361,0.00023298182],"category_scores_gemma":[0.0000091483835,0.00017799929,0.000020534879,0.0004341601,0.000028985773,0.00068140315,0.000066474124,0.00015458935,0.0000945691],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022134074,0.000035647594,0.010414799,0.00006024758,0.00013910064,0.000013142339,0.00004796121,0.98485273,0.00028612657,0.0003116754,0.0036309839,0.0001854376],"study_design_scores_gemma":[0.0029275825,0.00023130044,0.01612046,0.00035298907,0.00009566841,0.00007226544,0.000082160695,0.9615087,0.0024045797,0.000052422118,0.0150290625,0.0011228253],"about_ca_topic_score_codex":0.000021220778,"about_ca_topic_score_gemma":0.000045469496,"teacher_disagreement_score":0.48272225,"about_ca_system_score_codex":0.0001396792,"about_ca_system_score_gemma":0.00007697348,"threshold_uncertainty_score":0.72586006},"labels":[],"label_agreement":null},{"id":"W2979431759","doi":"10.1109/ccece.2019.8861590","title":"Flexible Robust Unit Commitment Considering Sub-hourly Wind Power Ramp Behaviors","year":2019,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Power system simulation; Wind power; Unit (ring theory); Power (physics); Control theory (sociology); Wind power forecasting; Computer science; Marine engineering; Environmental science; Electric power system; Meteorology; Electrical engineering; Engineering; Physics; Psychology; Artificial intelligence","score_opus":0.013422986931611128,"score_gpt":0.20748410227900074,"score_spread":0.19406111534738962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979431759","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87619734,0.0003074115,0.053400625,0.000049605667,0.0011774291,0.0007249177,0.000006015051,0.0013312413,0.06680544],"genre_scores_gemma":[0.9955164,0.000016136786,0.0019711822,0.000048649807,0.000019612497,0.000010973755,0.000016972663,0.000068046,0.0023320303],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9989361,0.000026247211,0.0002835675,0.00019421379,0.00020474922,0.00035512573],"domain_scores_gemma":[0.9993924,0.00004941814,0.000035227426,0.00037359915,0.000053483924,0.00009586826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015147595,0.00019964782,0.00022133143,0.00015225653,0.000042094925,0.000070446236,0.00014143248,0.00011077728,0.0008643939],"category_scores_gemma":[0.0000073150163,0.00020524098,0.00005077647,0.00030446783,0.000011911186,0.00021361321,0.000031568816,0.00016442285,0.00065448624],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007919362,0.000045363602,0.02382402,0.00007071563,0.00009285465,0.0000136798135,0.00046108986,0.9513444,0.015982732,0.001076021,0.006718775,0.00036243084],"study_design_scores_gemma":[0.007295749,0.00090395386,0.023581143,0.00055673067,0.00025705982,0.000268993,0.0021511859,0.37186795,0.54456925,0.00015083536,0.044111077,0.0042860415],"about_ca_topic_score_codex":0.000042127256,"about_ca_topic_score_gemma":0.000022821643,"teacher_disagreement_score":0.5794764,"about_ca_system_score_codex":0.00013803667,"about_ca_system_score_gemma":0.000026127627,"threshold_uncertainty_score":0.9464507},"labels":[],"label_agreement":null},{"id":"W2979913014","doi":"10.1049/iet-gtd.2019.0257","title":"Integrated transmission and storage systems investment planning hosting wind power generation: continuous‐time hybrid stochastic/robust optimisation","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Etobicoke General Hospital","funders":"","keywords":"Investment (military); Computer science; Electric power system; Wind power; Transmission (telecommunications); Mathematical optimization; Power (physics); Engineering; Electrical engineering; Mathematics; Telecommunications","score_opus":0.012240979004186412,"score_gpt":0.19771542143969298,"score_spread":0.18547444243550656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979913014","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25820464,0.0018331982,0.7372841,0.000087794906,0.0006882612,0.00108983,0.00010826683,0.00044032888,0.00026358193],"genre_scores_gemma":[0.98929554,0.000079071746,0.0031457574,0.00004646045,0.000252431,0.00006112666,0.0066452823,0.00008536485,0.00038897665],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971928,0.00024129727,0.0008998467,0.00063299155,0.000565179,0.00046790746],"domain_scores_gemma":[0.9988649,0.00006058986,0.00019992852,0.00030572896,0.00028235078,0.00028648356],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005944042,0.0005009254,0.0004787329,0.00019318689,0.00033976132,0.0003607146,0.0001375888,0.00029529262,0.00018455503],"category_scores_gemma":[0.000032192194,0.0004975428,0.00009000562,0.00040716067,0.000033977256,0.00072627515,0.0000120153845,0.00032743538,0.000039115646],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026466736,0.00003541466,0.00003272384,0.00006515414,0.000041322717,0.000004076506,0.00033660632,0.7791364,0.2146272,0.00014626194,0.003749642,0.0017986802],"study_design_scores_gemma":[0.0011634405,0.00017727388,0.00010581996,0.0002992798,0.000067018664,0.000056441906,0.00008847569,0.97142404,0.020264035,0.000004782461,0.0058106044,0.0005388005],"about_ca_topic_score_codex":0.000016615624,"about_ca_topic_score_gemma":3.517278e-7,"teacher_disagreement_score":0.73413837,"about_ca_system_score_codex":0.00047706554,"about_ca_system_score_gemma":0.0001019892,"threshold_uncertainty_score":0.99974763},"labels":[],"label_agreement":null},{"id":"W2984687746","doi":"10.1109/poweri.2014.7117633","title":"Optimization of co-generation system operation","year":2014,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Cogeneration; Integer programming; Linear programming; Mathematical optimization; Computer science; Selection (genetic algorithm); Optimization problem; Electricity generation; Mathematics; Power (physics)","score_opus":0.00669610139861456,"score_gpt":0.18856246924598355,"score_spread":0.18186636784736898,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2984687746","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0038113515,0.000030027617,0.9513962,0.000006729919,0.00027206424,0.00015190002,0.0000011683528,0.00034638122,0.043984167],"genre_scores_gemma":[0.9812315,0.000007886715,0.018443825,0.000006997455,0.0000974334,0.000013648783,0.00008055904,0.000019719537,0.000098397686],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994081,0.00004221924,0.00025809914,0.000086086446,0.00012031724,0.00008515391],"domain_scores_gemma":[0.9997154,0.000014412907,0.00003640581,0.00014085324,0.000068299014,0.000024625617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019330218,0.00007557529,0.00011272643,0.00009124703,0.00002890874,0.000022666263,0.000051772102,0.00006150734,0.000038741244],"category_scores_gemma":[0.0000148983045,0.0000748589,0.000018407116,0.00014493195,0.0000049308824,0.00017199939,0.00000286379,0.000027287371,0.000021613314],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.741298e-7,0.0000034262146,0.000049324557,0.000057011624,0.0000069347525,3.6082607e-8,0.00003610761,0.98530567,0.0090638185,0.00419462,0.0008023494,0.00048004862],"study_design_scores_gemma":[0.00014319023,0.000022794336,0.000016046044,0.000011695163,0.000006236285,0.0000025555673,0.000012132256,0.94534034,0.054241706,7.553745e-7,0.00013047385,0.00007210918],"about_ca_topic_score_codex":0.0000067226733,"about_ca_topic_score_gemma":0.0000033785996,"teacher_disagreement_score":0.9774202,"about_ca_system_score_codex":0.00007164707,"about_ca_system_score_gemma":0.0000073161814,"threshold_uncertainty_score":0.30526575},"labels":[],"label_agreement":null},{"id":"W2984773493","doi":"10.1109/psce.2006.296345","title":"Power System Security in Market Clearing and Dispatch Mechanisms","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Amec Foster Wheeler (Canada); University of Waterloo","funders":"","keywords":"Bidding; Market clearing; Economic dispatch; Electric power system; Computer science; Clearing; Common value auction; Mathematical optimization; Power (physics); Economics; Microeconomics; Finance","score_opus":0.0013280503003402794,"score_gpt":0.14803801048829016,"score_spread":0.14670996018794988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2984773493","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26802707,0.00043903606,0.2932384,0.000034652545,0.00043769108,0.00041111556,0.0000031713193,0.0010806839,0.43632817],"genre_scores_gemma":[0.99812067,0.000005365213,0.0015154921,0.0000040698087,0.00001264667,0.000010313212,0.000001762934,0.000022450853,0.00030723482],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99939823,0.00002263973,0.00017998781,0.00012439488,0.00009065665,0.00018407269],"domain_scores_gemma":[0.99981743,0.000021022426,0.000013755856,0.00010961778,0.000010751738,0.000027400314],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018052751,0.00009495118,0.00012211074,0.000090466434,0.000017848526,0.000034524022,0.000043272124,0.00006802748,0.000043720225],"category_scores_gemma":[0.0000038866992,0.00009605573,0.000013072145,0.00018558353,0.0000035814448,0.00010570306,0.00001738179,0.000073763906,0.00000836104],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009110136,0.00024095342,0.083235726,0.003984174,0.00016878401,0.00030409615,0.0021550665,0.20098968,0.014930401,0.65432566,0.03777331,0.0018010397],"study_design_scores_gemma":[0.0004325643,0.000018184803,0.012868354,0.00009948578,0.000005038859,0.00003400008,0.00016723509,0.98333776,0.0015775249,0.0009973893,0.00019817123,0.000264269],"about_ca_topic_score_codex":0.00020853487,"about_ca_topic_score_gemma":0.00018223193,"teacher_disagreement_score":0.7823481,"about_ca_system_score_codex":0.000110768786,"about_ca_system_score_gemma":0.0000033048855,"threshold_uncertainty_score":0.3917039},"labels":[],"label_agreement":null},{"id":"W2985214757","doi":"10.1109/pes.2006.1709599","title":"The impact of the restructuring of the electric power industry on its workforce","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Workforce; Restructuring; Electric power industry; Presentation (obstetrics); Power (physics); Business; Industrial organization; Telecommunications; Engineering; Electricity; Electrical engineering; Economics; Economic growth; Finance; Physics; Medicine","score_opus":0.0054089223246507525,"score_gpt":0.20661202964091643,"score_spread":0.20120310731626567,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2985214757","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99359757,0.0011782986,0.0012799457,0.00004289025,0.0012441846,0.0003592903,0.000009882252,0.00016418281,0.0021237647],"genre_scores_gemma":[0.9989045,0.000031889915,0.0003684484,0.00001197583,0.00020984933,0.000016729777,0.0000010936103,0.00009287643,0.00036263256],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980303,0.000071104434,0.0005949382,0.00021550918,0.0004684934,0.00061967666],"domain_scores_gemma":[0.99882257,0.00020229726,0.00023220154,0.00059160736,0.00010509949,0.00004623068],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048789548,0.00034449692,0.00027637545,0.000051627423,0.00021828637,0.00004907928,0.00062235753,0.00031529772,0.0000047346703],"category_scores_gemma":[0.000117562406,0.00020363137,0.0005229043,0.0012059676,0.000035904523,0.00008765417,0.000054504933,0.00082716125,0.0000013471965],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000027899248,0.000008503447,0.0013524619,0.00002538393,0.000072304254,1.8657137e-7,0.00013096542,0.8731941,0.122167446,0.00015264032,0.0028486482,0.00004459725],"study_design_scores_gemma":[0.00037371065,0.00005354992,0.027147181,0.00038049545,0.000039118488,0.000016209324,0.000031223168,0.6240148,0.34721002,0.000026548534,0.000276715,0.00043044786],"about_ca_topic_score_codex":0.000078459925,"about_ca_topic_score_gemma":0.0000025828542,"teacher_disagreement_score":0.24917929,"about_ca_system_score_codex":0.00036344316,"about_ca_system_score_gemma":0.000065153356,"threshold_uncertainty_score":0.8303847},"labels":[],"label_agreement":null},{"id":"W2989123274","doi":"10.1016/j.energy.2019.116438","title":"A new flexible model for generation scheduling in a smart grid","year":2019,"lang":"en","type":"article","venue":"Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Demand response; Integer programming; Smart grid; Distributed generation; Linear programming; Power system simulation; Scheduling (production processes); Computer science; Energy storage; Electric power system; Grid; Latin hypercube sampling; Wind power; Mathematical optimization; Engineering; Renewable energy; Electricity; Power (physics); Electrical engineering; Algorithm; Mathematics","score_opus":0.01301557746754418,"score_gpt":0.20597339674515508,"score_spread":0.1929578192776109,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2989123274","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020101665,0.0003431275,0.9767698,0.00002198935,0.0005064732,0.00010334475,0.000001156026,0.00014277558,0.0020096523],"genre_scores_gemma":[0.93557405,0.000025938052,0.059948657,0.00004374975,0.00023477354,0.0000468163,0.000045160254,0.000036365636,0.004044469],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952203,0.0000063199027,0.0001415746,0.00011347303,0.00006222704,0.0001543497],"domain_scores_gemma":[0.9998106,0.000011806031,0.000015333551,0.00011543016,0.000015944992,0.000030913867],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000065543536,0.0000743586,0.00009570879,0.00010526631,0.000011309672,0.000019587518,0.000054895132,0.000059819395,0.000013200891],"category_scores_gemma":[0.000007824212,0.000084445805,0.000023659444,0.0001649554,8.4972385e-7,0.00012276588,0.0000057979455,0.000033893266,0.00001052056],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000027874498,0.0000027579708,0.000049201255,0.000012079278,0.000005268724,1.19046e-7,0.0000674835,0.9830231,0.0102709895,0.0036262497,0.0014706703,0.0014692999],"study_design_scores_gemma":[0.00034312168,0.000012217584,0.0000061182905,0.0000134522925,0.000002201899,8.546618e-7,0.000002099842,0.98588204,0.011675465,0.00015403764,0.0018128494,0.00009553192],"about_ca_topic_score_codex":0.00008012393,"about_ca_topic_score_gemma":0.00014235103,"teacher_disagreement_score":0.9168212,"about_ca_system_score_codex":0.00008467517,"about_ca_system_score_gemma":0.00003959996,"threshold_uncertainty_score":0.34436},"labels":[],"label_agreement":null},{"id":"W2990497803","doi":"10.1049/iet-gtd.2019.0844","title":"Security‐constrained transmission expansion planning using linear sensitivity factors","year":2019,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"D-Wave Systems (Canada)","funders":"","keywords":"Sensitivity (control systems); Transmission (telecommunications); Computer science; Mathematical optimization; Mathematics; Electronic engineering; Engineering; Telecommunications","score_opus":0.016383761647324614,"score_gpt":0.23622054551385424,"score_spread":0.21983678386652963,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2990497803","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45327252,0.00024044332,0.54511607,0.000039036342,0.00040451996,0.00037652664,0.00006240617,0.00037334373,0.000115119336],"genre_scores_gemma":[0.99451417,0.00007006671,0.002063053,0.000019718525,0.00017749592,0.000009171116,0.0030410434,0.0000621415,0.00004312022],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99773365,0.00021870437,0.00061744126,0.00047459806,0.00049679464,0.0004588364],"domain_scores_gemma":[0.9991625,0.00006215974,0.00010603495,0.0002844257,0.00015177496,0.0002331061],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00043250094,0.0004061286,0.00037532058,0.00015087855,0.00026030873,0.00008410083,0.00009523652,0.0003835064,0.00018198903],"category_scores_gemma":[0.000017170523,0.00039923473,0.00016367775,0.0005453066,0.00002699038,0.00058711314,0.000008370685,0.00032228988,0.000026028634],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020858732,0.00003776163,0.00034748783,0.00009063804,0.000021018555,0.000004897942,0.0004224047,0.48339584,0.5120932,0.0000475025,0.00038199587,0.0031363894],"study_design_scores_gemma":[0.0005831066,0.000054647073,0.00026160758,0.00014880944,0.00003630746,0.000020341007,0.00006153222,0.7619208,0.23363349,0.000016406486,0.0029015823,0.00036133511],"about_ca_topic_score_codex":0.00002405113,"about_ca_topic_score_gemma":0.0000015225312,"teacher_disagreement_score":0.54305303,"about_ca_system_score_codex":0.00031663166,"about_ca_system_score_gemma":0.000093797134,"threshold_uncertainty_score":0.999846},"labels":[],"label_agreement":null},{"id":"W2995919834","doi":"10.1016/j.compchemeng.2019.106677","title":"Uncertainty management via online scheduling for optimal short-term operation of cascaded hydropower systems","year":2019,"lang":"en","type":"article","venue":"Computers & Chemical Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hatch (Canada); McMaster University","funders":"Ontario Centres of Excellence","keywords":"Hydropower; Scheduling (production processes); Electricity; Electricity market; Computer science; Electricity generation; Electric power system; Time horizon; Operations research; Power system simulation; Term (time); Mathematical optimization; Engineering; Power (physics); Operations management","score_opus":0.005551236270046807,"score_gpt":0.20207712572114828,"score_spread":0.19652588945110147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2995919834","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32691458,0.00022238279,0.6712108,0.000004262059,0.0008302841,0.0005198049,0.000006506286,0.00025056602,0.000040752555],"genre_scores_gemma":[0.9386304,0.000011092811,0.06098533,0.0000048759025,0.0001111458,0.000040494553,0.00013653439,0.0000657628,0.000014368752],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99874425,0.000006551872,0.00046541146,0.0002690844,0.00018557704,0.00032909922],"domain_scores_gemma":[0.9994924,0.00006481923,0.000037423182,0.0002645785,0.000057657726,0.00008309189],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000109613604,0.00024257938,0.00035605786,0.00014398446,0.000015041723,0.000043256223,0.000229728,0.00012755356,0.0000040225573],"category_scores_gemma":[0.0000054108045,0.00026962114,0.00009321695,0.00020288001,0.000008273653,0.00013698306,0.000051869232,0.00014400849,0.000004689263],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000760231,0.000019269984,0.0000192058,0.0007568418,0.00010586323,0.0000020435507,0.00005318749,0.8692931,0.12891653,0.00014474307,0.000034422283,0.0006471788],"study_design_scores_gemma":[0.00046904688,0.000030229725,0.000011409702,0.00025490293,0.00002888474,0.000014910763,0.000010604909,0.9746307,0.024137398,7.6416364e-7,0.0001431142,0.00026803164],"about_ca_topic_score_codex":0.0000027453277,"about_ca_topic_score_gemma":7.331393e-8,"teacher_disagreement_score":0.6117158,"about_ca_system_score_codex":0.00022833524,"about_ca_system_score_gemma":0.00000732937,"threshold_uncertainty_score":0.9999756},"labels":[],"label_agreement":null},{"id":"W2995953263","doi":"","title":"Strategic Reneging in Sequential Imperfect Markets","year":2019,"lang":"en","type":"article","venue":"Munich Personal RePEc Archive (Munich University)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"HEC Montréal; Labex Ecodec; Agence Nationale de la Recherche","keywords":"Procurement; Incentive; Imperfect; Revenue; Electricity; Economics; Microeconomics; Industrial organization; Electricity market; Business; Marketing; Finance; Engineering","score_opus":0.007714837442599651,"score_gpt":0.17724033544815673,"score_spread":0.16952549800555708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2995953263","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7398974,0.00024438472,0.0012686912,0.000025578649,0.00024952757,0.00034372197,0.000020077383,0.00025919522,0.25769144],"genre_scores_gemma":[0.9949874,0.0004030457,0.0009132412,0.000013233507,0.000039072343,0.0000016805317,0.000059726888,0.00005006513,0.0035325054],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998281,0.00026506244,0.00022783676,0.00039975083,0.00027620327,0.0005501304],"domain_scores_gemma":[0.9990865,0.00018827741,0.000062385916,0.00048457558,0.00004575229,0.00013252713],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00026956917,0.00027572337,0.0003191058,0.0007934654,0.00010187444,0.000044284003,0.0005491639,0.00012283686,0.00023564983],"category_scores_gemma":[0.000019128538,0.00034309094,0.0001337211,0.00090685784,0.00005262977,0.00036865828,0.00016947773,0.0005077283,0.00008394034],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0025923538,0.0010086409,0.109596305,0.0026398404,0.0025267384,0.0053141504,0.03960399,0.5322822,0.20448987,0.08017906,0.0034397363,0.016327122],"study_design_scores_gemma":[0.003261969,0.00021780208,0.005153608,0.00044797242,0.00006860706,0.000117583535,0.0031846892,0.9672898,0.0006519087,0.00034299147,0.018087562,0.0011754999],"about_ca_topic_score_codex":0.00020011407,"about_ca_topic_score_gemma":0.000497968,"teacher_disagreement_score":0.43500763,"about_ca_system_score_codex":0.00051739404,"about_ca_system_score_gemma":0.00014281031,"threshold_uncertainty_score":0.9999021},"labels":[],"label_agreement":null},{"id":"W2995962999","doi":"10.1016/j.ijindorg.2020.102676","title":"Analyzing firm behavior in restructured electricity markets: Empirical challenges with a residual demand analysis","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrial Organization","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Residual; Bidding; Monotonic function; Econometrics; Economics; Smoothing; Demand curve; Profit (economics); Electricity; Microeconomics; Electricity market; Ex-ante; Mathematical optimization; Computer science; Mathematics; Algorithm","score_opus":0.02637596045306552,"score_gpt":0.24979887972395506,"score_spread":0.22342291927088953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2995962999","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9459667,0.00050901354,0.050923754,0.0018669938,0.00038914185,0.00018230907,0.000008468013,0.00006815285,0.00008543109],"genre_scores_gemma":[0.99830985,0.0002812158,0.0006591085,0.000040939573,0.00063958636,0.0000019109332,0.000032033844,0.0000325541,0.000002794302],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99828064,0.00013134573,0.0007108004,0.00016348879,0.0005546577,0.0001590473],"domain_scores_gemma":[0.9987553,0.00009452893,0.00032822049,0.000080809,0.00063409243,0.000107084656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030594377,0.00016076343,0.00034367995,0.0008122427,0.000024946945,0.000085562206,0.00032943752,0.00018658041,0.00007302433],"category_scores_gemma":[0.0007109961,0.00014570687,0.000054522607,0.0025714948,0.000013697594,0.00037559966,0.000022325854,0.00040793233,0.0000017989983],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045064188,0.00008149913,0.7342803,0.000010677876,0.0015426677,0.0002646462,0.0010995689,0.25577578,0.0015615049,0.000034076766,0.0011265473,0.003772114],"study_design_scores_gemma":[0.012484315,0.0012666722,0.87188774,0.00033178556,0.0028250555,0.0006057024,0.0005389242,0.08035459,0.027588421,0.00005392824,0.00072598585,0.0013368835],"about_ca_topic_score_codex":0.0000067394894,"about_ca_topic_score_gemma":0.00002806942,"teacher_disagreement_score":0.1754212,"about_ca_system_score_codex":0.00035154357,"about_ca_system_score_gemma":0.00013812433,"threshold_uncertainty_score":0.5941754},"labels":[],"label_agreement":null},{"id":"W3003179592","doi":"10.1109/pesgm40551.2019.8973550","title":"Flexibility Management Considering Transmission Limit and Correlation of Wind Power","year":2019,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Flexibility (engineering); Wind power; Electric power system; Computer science; Reliability engineering; Power (physics); Limit (mathematics); Control engineering; Engineering; Electrical engineering; Mathematics; Physics","score_opus":0.005726993336207118,"score_gpt":0.1888986861164314,"score_spread":0.18317169278022427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3003179592","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5908439,0.00031893127,0.314396,0.00001738673,0.00019184145,0.0004124154,5.806311e-7,0.0001668121,0.09365209],"genre_scores_gemma":[0.9932174,0.000037712773,0.0061832713,0.0000058769633,0.0000021730996,0.0000012025029,0.0000019844201,0.000010719885,0.0005396439],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995404,0.000010771063,0.00017294973,0.00010423649,0.000087420965,0.000084210405],"domain_scores_gemma":[0.9997869,0.00002668834,0.000019111838,0.00012480431,0.000016231248,0.000026263997],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010744098,0.00006672976,0.00010026211,0.000060971433,0.000009610668,0.0000075198836,0.000027365168,0.000043637137,0.00016355368],"category_scores_gemma":[0.000002476147,0.0000640247,0.000015901018,0.00009912316,0.0000063948232,0.000101881495,0.000007881067,0.00003966119,0.00001302801],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003830672,0.000048420807,0.035437983,0.0011918385,0.00014227441,0.0000028940856,0.0011451212,0.91676396,0.015221029,0.00620163,0.0005151251,0.02329142],"study_design_scores_gemma":[0.0009059196,0.00008428117,0.030803159,0.000156374,0.000029589333,0.000008113639,0.00013325684,0.9533227,0.012088369,0.000242153,0.0019758625,0.000250238],"about_ca_topic_score_codex":0.000002722016,"about_ca_topic_score_gemma":5.028253e-7,"teacher_disagreement_score":0.40237346,"about_ca_system_score_codex":0.000025680107,"about_ca_system_score_gemma":0.0000028076963,"threshold_uncertainty_score":0.26108515},"labels":[],"label_agreement":null},{"id":"W3003545925","doi":"10.1016/j.ejor.2020.01.044","title":"Strategic offering of a flexible producer in day-ahead and intraday power markets","year":2020,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Profit maximization; Clearance; Profit (economics); Market power; Market clearing; Industrial organization; Competition (biology); Clearing; Electricity market; Imperfect competition; Business; Microeconomics; Economics; Electricity; Finance","score_opus":0.0715432544506043,"score_gpt":0.2978802218438506,"score_spread":0.2263369673932463,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3003545925","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9575651,0.0018793317,0.005705888,0.0010519525,0.00014454869,0.00022818147,0.0000035737464,0.000017847135,0.033403542],"genre_scores_gemma":[0.99854493,0.00010022334,0.0011103973,0.000016430393,0.00011648159,0.0000011167731,0.0000014256656,0.00002608276,0.00008292647],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99819314,0.00053412246,0.00046639924,0.00011068818,0.00051254994,0.00018311168],"domain_scores_gemma":[0.999331,0.00011018898,0.000045246128,0.00007725232,0.0003191072,0.000117194075],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002907293,0.00007839351,0.00015481484,0.00024014921,0.000032015934,0.00006892139,0.00017302441,0.000016957558,0.00015016922],"category_scores_gemma":[0.0003017825,0.000071284136,0.000021537799,0.00043889758,0.000034339777,0.00024757985,0.000037828948,0.0004099909,0.000012288239],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001114423,0.00041882516,0.010857677,0.0009886484,0.00053448125,0.001960857,0.026668515,0.48263133,0.42440292,0.013796339,0.018854268,0.017771728],"study_design_scores_gemma":[0.010489448,0.0061495425,0.41217253,0.0024573694,0.000047995556,0.0011600186,0.003676115,0.47340235,0.07498055,0.00043087182,0.01340482,0.0016283861],"about_ca_topic_score_codex":0.0000011726787,"about_ca_topic_score_gemma":4.8115584e-7,"teacher_disagreement_score":0.40131485,"about_ca_system_score_codex":0.000054579785,"about_ca_system_score_gemma":0.00011460241,"threshold_uncertainty_score":0.29068828},"labels":[],"label_agreement":null},{"id":"W3004000849","doi":"10.2139/ssrn.3506915","title":"Optimal Cross-Border Electricity Trading","year":2019,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Electricity; Business; Industrial organization; Engineering","score_opus":0.003451076574138459,"score_gpt":0.25267362941101895,"score_spread":0.2492225528368805,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3004000849","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73394865,0.003968846,0.24980219,0.000031817013,0.00073540595,0.00022977855,0.000001105989,0.00032874124,0.010953471],"genre_scores_gemma":[0.99432105,0.001293207,0.000514498,0.000021683512,0.00024511397,0.0000062535514,0.0000042111446,0.00008445242,0.0035095096],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9961873,0.000049716473,0.00041161993,0.00022048462,0.00033289887,0.0027979473],"domain_scores_gemma":[0.9994469,0.00004659624,0.00009358304,0.00021963859,0.00009051562,0.0001027299],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010896225,0.00024988936,0.00027982923,0.0002499025,0.00013101936,0.0001541908,0.00028007463,0.00015023946,0.00024674568],"category_scores_gemma":[0.00003174208,0.00025214683,0.00013022013,0.00060034404,0.00001436532,0.00048804667,0.000014255445,0.0020005351,0.00019623988],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016454792,0.00015809294,0.026045166,0.00014136796,0.0014225324,0.000021738884,0.00066566234,0.8464611,0.017704532,0.063907765,0.0011809536,0.042126514],"study_design_scores_gemma":[0.0053514196,0.0014467712,0.002848561,0.00011767837,0.00014724863,0.006747148,0.0004713931,0.9435749,0.008112847,0.014167165,0.01474392,0.0022709337],"about_ca_topic_score_codex":0.00000887235,"about_ca_topic_score_gemma":0.000021355328,"teacher_disagreement_score":0.26037243,"about_ca_system_score_codex":0.0018029395,"about_ca_system_score_gemma":0.0006187461,"threshold_uncertainty_score":0.9999931},"labels":[],"label_agreement":null},{"id":"W3007584316","doi":"10.1016/j.enpol.2020.111348","title":"Reforming the electric power industry in developing economies evidence on efficiency and electricity access outcomes","year":2020,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Institute of Aging","keywords":"Endogeneity; Electricity; Mains electricity; Exploit; Electric power industry; Robustness (evolution); Per capita; Economics; Developing country; Business; Electric power; Consumption (sociology); Industrial organization; Power (physics); Economic growth; Engineering; Population; Econometrics","score_opus":0.02571440024876655,"score_gpt":0.2671849704988075,"score_spread":0.24147057025004096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3007584316","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9689865,0.0014499997,0.014380242,0.008728508,0.00013516756,0.00019488853,0.0000010157939,0.00030611258,0.005817543],"genre_scores_gemma":[0.9971243,0.00038120465,0.000041288615,0.0022614205,0.00008778424,0.00002623073,6.577825e-7,0.000026726424,0.000050392693],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989503,0.00005338791,0.00028616493,0.00021613094,0.0001198426,0.0003741802],"domain_scores_gemma":[0.9994807,0.00021338426,0.000057225338,0.00016132652,0.000018059249,0.000069252594],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015775012,0.00018243921,0.00020877492,0.00030922086,0.00008254445,0.00008879482,0.00034070958,0.00019290604,0.0000049563882],"category_scores_gemma":[0.00039990534,0.00014105586,0.0000264343,0.0014742399,0.000013791928,0.00034275308,0.000061668405,0.0004265761,0.0000043547398],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006643125,0.00005120405,0.06529447,0.00020145172,0.00017026013,0.00002945369,0.004447547,0.809595,0.0023334033,0.08812035,0.0019275134,0.027762908],"study_design_scores_gemma":[0.001617047,0.00048826396,0.1770068,0.0005453159,0.000038785365,0.000060907158,0.00017562328,0.71498066,0.092018224,0.0010138653,0.009817782,0.0022367388],"about_ca_topic_score_codex":0.00041769698,"about_ca_topic_score_gemma":0.000051416024,"teacher_disagreement_score":0.11171233,"about_ca_system_score_codex":0.00036910284,"about_ca_system_score_gemma":0.00013128422,"threshold_uncertainty_score":0.5752091},"labels":[],"label_agreement":null},{"id":"W3008095092","doi":"10.1109/naps46351.2019.9000207","title":"Energy and Reserve Dispatch with Renewable Generation Using Data-Driven Distributionally Robust Optimization","year":2019,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Mathematical optimization; CVAR; Wind power; Ambiguity; Electric power system; Computer science; Robust optimization; Economic dispatch; Renewable energy; Stochastic programming; Stochastic optimization; Expected shortfall; Power (physics); Risk management; Engineering; Mathematics; Economics","score_opus":0.023342768400795928,"score_gpt":0.20378977506832896,"score_spread":0.18044700666753302,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3008095092","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022841059,0.00014975034,0.97500664,0.00003034927,0.000121887315,0.00015068316,0.000034550525,0.00016121633,0.001503838],"genre_scores_gemma":[0.8583991,0.0001083119,0.13790472,0.00001863427,0.00010451613,0.000009329848,0.0027823197,0.000046095443,0.0006270105],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991539,0.000030021962,0.00018663843,0.00026812853,0.00018301085,0.00017829273],"domain_scores_gemma":[0.9994035,0.00001970822,0.000042912226,0.00039117827,0.000090851834,0.00005185819],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010840011,0.00012984473,0.00013334402,0.00006745767,0.000060788698,0.00009493466,0.00013292114,0.00007250895,0.000070398826],"category_scores_gemma":[0.000008786328,0.0001169457,0.000008402341,0.00029222868,0.0000100361685,0.0006662021,0.00005381858,0.0000385751,0.0000019520478],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000054617462,0.000006761769,0.0017866872,0.000020632653,0.000026802516,7.790679e-7,0.000008594692,0.99537313,0.0013430591,0.0002511556,0.0011182404,0.000058721038],"study_design_scores_gemma":[0.0002859187,0.000027480379,0.000048232076,0.000024718456,0.000018610855,0.000014702032,0.000008269526,0.998305,0.00080414943,0.0000035342598,0.00029385107,0.00016548434],"about_ca_topic_score_codex":0.00042269827,"about_ca_topic_score_gemma":0.0005687361,"teacher_disagreement_score":0.83710194,"about_ca_system_score_codex":0.000114454706,"about_ca_system_score_gemma":0.000038852166,"threshold_uncertainty_score":0.47689074},"labels":[],"label_agreement":null},{"id":"W3009278159","doi":"10.82308/27997","title":"A comparison of pay-as-bid and marginal pricing in electricity markets /","year":2008,"lang":"en","type":"article","venue":"eScholarship@McGill (McGill)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Economics; Electricity; Electricity pricing; Marginal cost; Microeconomics; Business; Financial economics; Electricity market; Engineering","score_opus":0.013309450498046061,"score_gpt":0.22856604792054316,"score_spread":0.21525659742249711,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3009278159","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97453004,0.0006646716,0.000048209902,0.0000068551713,0.00018592441,0.00039484462,0.000025073135,0.00024978173,0.023894621],"genre_scores_gemma":[0.9980494,0.00033316563,0.0012992924,0.000026940745,0.000011943418,0.000029435154,0.000009833498,0.00007623328,0.00016377312],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99763167,0.00019342054,0.0007685376,0.00041154234,0.00042881878,0.0005659851],"domain_scores_gemma":[0.999015,0.00022032928,0.0001656675,0.00032936642,0.00010632382,0.0001633471],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006060142,0.00033531067,0.0006056306,0.00049847265,0.0002283664,0.000017365737,0.00024324763,0.00024130376,0.000034760382],"category_scores_gemma":[0.00031092382,0.00034498758,0.00007379227,0.0011716096,0.00004496418,0.00047585584,0.00006922465,0.0007227903,0.000026382526],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001005629,0.0016186556,0.20007862,0.002721015,0.000746966,0.00076597504,0.00033119408,0.05776515,0.4423482,0.035635415,0.00012614392,0.256857],"study_design_scores_gemma":[0.0064739264,0.00093584217,0.18157972,0.0009408883,0.00017065303,0.0012404629,0.00014668792,0.160483,0.6276299,0.003627223,0.013753752,0.0030179878],"about_ca_topic_score_codex":0.00014570977,"about_ca_topic_score_gemma":0.00008933806,"teacher_disagreement_score":0.25383905,"about_ca_system_score_codex":0.00048071303,"about_ca_system_score_gemma":0.000022734366,"threshold_uncertainty_score":0.9999002},"labels":[],"label_agreement":null},{"id":"W3013293689","doi":"","title":"Electricity market reforms: Institutional developments, investment dynamics and game modeling","year":2001,"lang":"en","type":"article","venue":"Library and Archives Canada (Government of Canada)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Investment (military); Electricity market; Economics; Electricity; Market economy; Business; Economic system; Political science; Engineering; Politics","score_opus":0.002487589972902998,"score_gpt":0.12316476351237901,"score_spread":0.12067717353947602,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3013293689","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24280825,0.0011747131,0.049680065,0.0005677423,0.00024433277,0.00030408465,0.00007551736,0.00006628368,0.705079],"genre_scores_gemma":[0.9947027,0.0007666109,0.0023844622,0.00032097122,0.000016816497,0.000007770204,0.000013494405,0.000016027883,0.001771149],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986984,0.000017685401,0.00023744219,0.00014294793,0.00066878804,0.00023470756],"domain_scores_gemma":[0.99968016,0.0000369641,0.000041405423,0.000087725406,5.892006e-7,0.0001531386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000012160519,0.00014216713,0.00014818656,0.000034032553,0.000091201524,0.000017291119,0.00009117,0.000024463308,0.000008129223],"category_scores_gemma":[0.0000023410448,0.0001424022,0.000008796876,0.000117841984,0.0000207539,0.00033079027,0.00004490612,0.000091485046,1.0422108e-9],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006649699,0.00008302247,0.07204433,0.0010863214,0.00066290674,0.0002917501,0.00035575934,0.41363543,0.00504496,0.44601926,0.0019121047,0.05819921],"study_design_scores_gemma":[0.00021994118,0.000015537798,0.005531565,0.000055592733,0.0000076541155,0.000027582832,0.000117144074,0.98905504,0.0018816647,0.00045090725,0.002454374,0.00018299783],"about_ca_topic_score_codex":0.0007116827,"about_ca_topic_score_gemma":0.010946487,"teacher_disagreement_score":0.7518944,"about_ca_system_score_codex":0.000055876353,"about_ca_system_score_gemma":0.00064462586,"threshold_uncertainty_score":0.61083966},"labels":[],"label_agreement":null},{"id":"W3015276644","doi":"10.1088/1755-1315/463/1/012041","title":"Price allocation of transmission line usage in open access system using mega volt ampere kilometer and mega volt ampere cost method for integrated Nepal power system","year":2020,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Volt; AC power; Electric power system; Electric power transmission; Transmission (telecommunications); Mega-; Computer science; Cost allocation; Power (physics); Electrical engineering; Engineering; Voltage; Economics","score_opus":0.028802505335274727,"score_gpt":0.26654956269681407,"score_spread":0.23774705736153934,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3015276644","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6134429,0.00021038698,0.38450515,0.00005442053,0.00009913696,0.0011742861,0.000055990018,0.00008360395,0.00037416237],"genre_scores_gemma":[0.9780546,0.000088235625,0.02172825,0.000021093632,0.000010158753,0.000036006542,0.000024431425,0.000019104698,0.000018135946],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99847347,0.00007165095,0.0004165749,0.00045398105,0.00026381653,0.0003205212],"domain_scores_gemma":[0.99942905,0.0000455784,0.00011405934,0.00015832738,0.00003534187,0.000217622],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049337983,0.00022422789,0.00035906237,0.00012364377,0.0001709343,0.00035178615,0.0004715941,0.000092085706,0.000018613426],"category_scores_gemma":[0.000031385505,0.00020181102,0.000023709921,0.000562385,0.00019909313,0.0018226973,0.00017218724,0.00011894286,6.5466855e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023916815,0.000035511188,0.00210654,0.0010869273,0.000028456707,0.0000061722203,0.003302321,0.025823079,0.9517959,0.0006571235,0.000009832543,0.01490901],"study_design_scores_gemma":[0.0006111985,0.00019755312,0.003692069,0.0003489696,0.000019783929,0.00003169583,0.002781705,0.8721207,0.11960951,0.0000016276854,0.00032901036,0.00025618324],"about_ca_topic_score_codex":0.00022025919,"about_ca_topic_score_gemma":0.000045278604,"teacher_disagreement_score":0.8462976,"about_ca_system_score_codex":0.00015259208,"about_ca_system_score_gemma":0.00009640857,"threshold_uncertainty_score":0.82296145},"labels":[],"label_agreement":null},{"id":"W3015489845","doi":"10.3390/pr8040441","title":"A Critical Review of the Modeling and Optimization of Combined Heat and Power Dispatch","year":2020,"lang":"en","type":"review","venue":"Processes","topic":"Electric Power System Optimization","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Metaheuristic; Economic dispatch; Computer science; Parallel metaheuristic; Electric power system; Cogeneration; Mathematical optimization; Field (mathematics); Electricity; Electricity generation; Work (physics); Power (physics); Operations research; Engineering; Artificial intelligence; Mathematics","score_opus":0.019733435007010414,"score_gpt":0.26863825016894904,"score_spread":0.24890481516193863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3015489845","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[3.208725e-7,0.9182267,0.0810107,0.00004763033,0.000054873482,0.00046312332,0.00001349692,0.00003596797,0.00014719297],"genre_scores_gemma":[0.00044829267,0.99800986,0.0014273087,0.000013712817,0.0000097469965,0.000040401123,0.000011110243,0.000037373153,0.0000022077597],"study_design_codex":"systematic_review","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990663,0.00004613553,0.00050111435,0.00015362972,0.0001387693,0.0000940373],"domain_scores_gemma":[0.9994323,0.00013753712,0.000074100724,0.00013688879,0.0001827585,0.000036391357],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000103889164,0.00018353724,0.00089914264,0.0000424944,0.000020180985,0.000014259488,0.000117450094,0.000091672555,0.0000059643185],"category_scores_gemma":[0.0007869342,0.00012819163,0.00005263382,0.00053756253,0.000029640283,0.000088262845,0.000047414633,0.00011544961,2.0828466e-7],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[8.854917e-7,0.000008454096,0.0000016444076,0.9724903,0.00004099901,2.9352026e-7,0.00004960847,0.014035511,1.3822299e-7,0.00003536374,0.00004741612,0.0132893855],"study_design_scores_gemma":[0.00015014327,0.00006796256,1.05186345e-7,0.4300333,0.0011928855,0.00004641769,0.000009230261,0.5327559,0.000010472137,0.00003577071,0.03530975,0.00038806244],"about_ca_topic_score_codex":0.0000018261841,"about_ca_topic_score_gemma":3.6973748e-7,"teacher_disagreement_score":0.542457,"about_ca_system_score_codex":0.000017162534,"about_ca_system_score_gemma":0.000097640346,"threshold_uncertainty_score":0.5227503},"labels":[],"label_agreement":null},{"id":"W3016277054","doi":"10.2478/rtuect-2020-0012","title":"Assessment of Factors Affecting Onshore Wind Power Deployment in India","year":2020,"lang":"en","type":"article","venue":"Environmental and Climate Technologies","topic":"Electric Power System Optimization","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canada Excellence Research Chairs, Government of Canada; Ministry of New and Renewable Energy India","keywords":"Wind power; Renewable energy; Environmental economics; Tariff; Per capita; Offshore wind power; Business; Environmental science; Economics; Engineering","score_opus":0.005840709040272292,"score_gpt":0.19502816748022872,"score_spread":0.18918745843995644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3016277054","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9979854,0.0005077193,0.00016669353,0.00003175093,0.00003021517,0.00017416645,0.000013269438,0.0003863258,0.00070443685],"genre_scores_gemma":[0.9988146,0.0006252191,0.0005230651,0.0000053834037,0.0000016144087,0.0000052146843,0.000008081894,0.000016128331,6.8259476e-7],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99940276,0.00000956161,0.00017901236,0.0001400854,0.00009516967,0.00017341808],"domain_scores_gemma":[0.9998313,0.000023896278,0.000038294264,0.00008631747,6.2150514e-7,0.00001953791],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004947832,0.00012005091,0.00016258654,0.00007045285,0.000022529402,0.0000084484345,0.00008194559,0.00008785764,0.000018874336],"category_scores_gemma":[0.0000074299887,0.00011012698,0.000019205052,0.00010520525,0.000044965956,0.00007601924,0.00009602001,0.00013804267,0.0000024377107],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002412189,0.00003388673,0.9443541,0.00008307125,0.000022981349,0.0000066306893,0.00060926104,0.0027015274,0.050898578,0.00011239369,0.000012000831,0.0011631376],"study_design_scores_gemma":[0.0003004044,0.00016514047,0.93618774,0.00003693179,0.00000972113,0.0000026521125,0.008240346,0.004185896,0.050629243,0.00001532566,0.000034206758,0.00019239665],"about_ca_topic_score_codex":0.0000011412421,"about_ca_topic_score_gemma":6.8761756e-7,"teacher_disagreement_score":0.008166382,"about_ca_system_score_codex":0.00008322126,"about_ca_system_score_gemma":0.0000017140344,"threshold_uncertainty_score":0.4490848},"labels":[],"label_agreement":null},{"id":"W3016992921","doi":"10.3390/app10082859","title":"Multi-Objective Optimal Reactive Power Planning under Load Demand and Wind Power Generation Uncertainties Using ε-Constraint Method","year":2020,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Electric Power System Optimization","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"AC power; Wind power; Probabilistic logic; Electric power system; Control theory (sociology); Mathematical optimization; Computer science; Transformer; Reliability engineering; Voltage; Engineering; Automotive engineering; Power (physics); Control (management); Mathematics; Electrical engineering","score_opus":0.041818703032822875,"score_gpt":0.2819223921312036,"score_spread":0.24010368909838076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3016992921","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3288239,0.0003356526,0.667682,0.000045879304,0.00012196132,0.00023016646,0.0000025658271,0.00010956926,0.0026483433],"genre_scores_gemma":[0.88005304,0.0000037457391,0.11976801,0.000104510706,0.000042058793,0.000006923317,0.0000016925007,0.000015661777,0.0000043824734],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877334,0.00004562563,0.00021737785,0.00039404113,0.00028654205,0.00028309016],"domain_scores_gemma":[0.9996037,0.00009635178,0.000071763665,0.000077572746,0.000056492245,0.000094135525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047544573,0.0001881189,0.0002052053,0.0000939587,0.00024601858,0.00015646438,0.00011956573,0.00008855368,0.000014438729],"category_scores_gemma":[0.00004099253,0.00017594111,0.000024036273,0.00046800743,0.00016216112,0.00031102958,0.000036087036,0.00014607141,0.0000035533542],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000069294806,0.000004934906,0.00009836782,0.0000059461336,0.000032286804,0.0000017425182,0.0065170918,0.83348083,0.15901089,0.00068694336,0.000032547745,0.00012146682],"study_design_scores_gemma":[0.00032165798,0.0000633316,0.0003411467,0.000017268096,0.000020896867,0.000016898834,0.005656773,0.9657058,0.027507795,0.00004533201,0.000032642325,0.00027047037],"about_ca_topic_score_codex":0.000017261897,"about_ca_topic_score_gemma":0.0000030181377,"teacher_disagreement_score":0.5512291,"about_ca_system_score_codex":0.00013374745,"about_ca_system_score_gemma":0.00010343321,"threshold_uncertainty_score":0.71746707},"labels":[],"label_agreement":null},{"id":"W3017838192","doi":"10.1109/epec47565.2019.9074783","title":"Novel Highly Precise Power Loss Estimators that Directly Solve Power Balance Equality Constraints","year":2019,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Reactance; Computer science; Susceptance; Power system simulation; Estimator; Control theory (sociology); AC power; Electric power system; Mathematical optimization; Power Balance; Transformer; Reliability engineering; Power (physics); Engineering; Mathematics; Electrical engineering; Electrical impedance; Voltage","score_opus":0.009098134405719483,"score_gpt":0.21621139581584484,"score_spread":0.20711326141012534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3017838192","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23091194,0.00015660874,0.5434703,0.000059218502,0.0023337204,0.00068933994,0.000043091248,0.00113968,0.22119609],"genre_scores_gemma":[0.9908536,0.000008257607,0.0076532844,0.000066586705,0.000022699238,0.000019652198,0.000015813133,0.00006748303,0.0012926272],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982869,0.000027369239,0.0003834637,0.00037480792,0.0003670491,0.0005603794],"domain_scores_gemma":[0.9989924,0.00014961227,0.00008084898,0.0005391634,0.000082328435,0.00015564261],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00035572227,0.00030879054,0.00037557515,0.000110659385,0.00004110961,0.00007275193,0.000268874,0.000185361,0.00094464165],"category_scores_gemma":[0.000051719533,0.00029357293,0.000093096554,0.00030856044,0.000059331305,0.00037583098,0.000043166234,0.00018897612,0.0006869131],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025791457,0.0012016827,0.45511338,0.0015576348,0.0018431856,0.000095096955,0.008706875,0.2898727,0.1371875,0.06475108,0.034112446,0.005300512],"study_design_scores_gemma":[0.012019489,0.00065515755,0.10570635,0.0013026509,0.0001959666,0.00058922626,0.0007369351,0.63894796,0.21273756,0.00050787505,0.019107535,0.0074932855],"about_ca_topic_score_codex":0.000046112575,"about_ca_topic_score_gemma":0.00001263811,"teacher_disagreement_score":0.75994164,"about_ca_system_score_codex":0.00028448604,"about_ca_system_score_gemma":0.00007548137,"threshold_uncertainty_score":0.99996865},"labels":[],"label_agreement":null},{"id":"W3018152892","doi":"10.3390/app10082964","title":"Optimal Scheduling of Large-Scale Wind-Hydro-Thermal Systems with Fixed-Head Short-Term Model","year":2020,"lang":"en","type":"article","venue":"Applied Sciences","topic":"Electric Power System Optimization","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Cuckoo search; Wind power; Computer science; Mathematical optimization; Thermal power station; Environmental science; Engineering; Particle swarm optimization; Mathematics; Algorithm; Waste management","score_opus":0.01632863792989521,"score_gpt":0.2272565440591769,"score_spread":0.2109279061292817,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3018152892","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67871636,0.0002112979,0.31325427,0.00001964583,0.00007018711,0.0002896555,0.0000056443105,0.00020218559,0.007230755],"genre_scores_gemma":[0.98118496,0.0000051591237,0.018649925,0.000021412054,0.00006585166,0.000031560416,0.0000035124428,0.000025120871,0.00001251563],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99858415,0.000012422731,0.00029066554,0.0003009654,0.00041662547,0.0003951693],"domain_scores_gemma":[0.99962115,0.000026202715,0.000055839766,0.00014838386,0.00003165062,0.00011677694],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026130606,0.00016609616,0.0002582148,0.00007738426,0.00011152246,0.00006668812,0.00034944905,0.00007175337,0.0000050424096],"category_scores_gemma":[0.0000046617924,0.00014142717,0.000028795506,0.00066681387,0.00009344877,0.00020240553,0.00003426009,0.00012319828,0.000009022013],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000831809,0.000011039564,0.0010876062,0.00008172435,0.000014663072,9.993037e-7,0.00082668813,0.97342366,0.024087679,0.00035550827,0.000025015323,0.00007710738],"study_design_scores_gemma":[0.00020186401,0.000054407472,0.0001361404,0.000033564593,0.000014377781,0.000003317681,0.00031730128,0.9910131,0.008028367,0.0000016665795,0.0000149983525,0.00018088904],"about_ca_topic_score_codex":0.0000030645413,"about_ca_topic_score_gemma":0.0000039235783,"teacher_disagreement_score":0.30246857,"about_ca_system_score_codex":0.00003017932,"about_ca_system_score_gemma":0.000057577436,"threshold_uncertainty_score":0.5767233},"labels":[],"label_agreement":null},{"id":"W3021436577","doi":"","title":"Uncertainty and Investment in Electricity Generation with an Application to the Case of Hydro-Québec","year":2003,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Restructuring; Investment (military); Competition (biology); Electricity; Linear programming; Process (computing); Electricity generation; Operations research; Duration (music); Economics; Face (sociological concept); Computer science; Mathematical optimization; Engineering; Finance; Mathematics; Power (physics)","score_opus":0.014850639102001548,"score_gpt":0.2596637621116189,"score_spread":0.24481312300961736,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3021436577","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9905793,0.00023893938,0.0016029819,0.00008786073,0.00004883571,0.0016846682,0.00001059983,0.000028191029,0.0057186186],"genre_scores_gemma":[0.9975065,0.00078119413,0.0009405494,0.00003369204,0.000039392493,0.0005793586,0.000035194083,0.00003707006,0.00004702154],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985398,0.00022328763,0.0004092602,0.00041973914,0.0001030256,0.0003048638],"domain_scores_gemma":[0.9990743,0.00009853581,0.00007568466,0.0005924406,0.00006775224,0.00009128813],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012012112,0.00017326784,0.00026010815,0.00037528324,0.000052332318,0.000048332713,0.00018863402,0.00016999555,0.0000023285018],"category_scores_gemma":[0.00007980374,0.00015473225,0.000018583965,0.00029948197,0.000045515488,0.00006719813,0.00007435385,0.00053226086,6.231668e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001810857,0.000031308522,0.0005795991,0.00007014074,0.00002074292,0.000013520291,0.0004819419,0.9661196,0.00031592374,0.00022908044,0.000010817631,0.032109257],"study_design_scores_gemma":[0.00023540382,0.00011365371,0.0002655684,0.000035235233,0.0000049807422,0.000061085266,0.00010392165,0.99768615,0.0007375086,0.00012161223,0.00045846374,0.000176433],"about_ca_topic_score_codex":0.0041222028,"about_ca_topic_score_gemma":0.063173994,"teacher_disagreement_score":0.059051793,"about_ca_system_score_codex":0.0015196454,"about_ca_system_score_gemma":0.00032015983,"threshold_uncertainty_score":0.95392066},"labels":[],"label_agreement":null},{"id":"W3022650078","doi":"10.1109/mper.2002.4311904","title":"Economic Inefficiencies and Cross-Subsidies in an Auction-Based Electricity Pool","year":2002,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Hydro-Québec","funders":"","keywords":"Subsidy; Electricity; Electricity market; Economic dispatch; Computer science; Economics; Mathematical optimization; Microeconomics; Auction algorithm; Power (physics); Auction theory; Revenue equivalence; Common value auction; Electric power system; Mathematics; Engineering","score_opus":0.009481165430636339,"score_gpt":0.22083061395187228,"score_spread":0.21134944852123594,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3022650078","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6386722,0.2828053,0.07363665,0.0001096797,0.0015781103,0.0010909262,0.000013127422,0.00144708,0.00064692297],"genre_scores_gemma":[0.988331,0.011017923,0.00041227206,0.000055157572,0.000041752486,0.00006173286,0.0000034543139,0.00005143818,0.000025250163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99885976,0.000022329823,0.00042368678,0.00024657804,0.00010598127,0.00034163485],"domain_scores_gemma":[0.9995177,0.00006309737,0.000041331736,0.00026152955,0.000028746043,0.00008759061],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002560923,0.0002419353,0.0003636457,0.00023015929,0.000031086758,0.000063808264,0.00014437182,0.00007866247,0.000075616525],"category_scores_gemma":[0.000055306416,0.00026153572,0.00004784236,0.00041629025,0.000016781027,0.00029828554,0.000006737649,0.00018232175,0.000043875854],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[8.477749e-7,0.000018479133,0.0012265278,0.0011422066,0.000011639325,0.0000044219732,0.00006569252,0.9953362,0.0006906435,0.000021215903,0.00047250275,0.0010096475],"study_design_scores_gemma":[0.00022021333,0.000049155984,0.0025658351,0.000711336,0.000014957653,0.000017882594,0.0000012080375,0.99247485,0.001337851,0.0000012207686,0.0022487591,0.0003567135],"about_ca_topic_score_codex":0.000009488738,"about_ca_topic_score_gemma":0.000010862922,"teacher_disagreement_score":0.34965882,"about_ca_system_score_codex":0.00023643071,"about_ca_system_score_gemma":0.00001187267,"threshold_uncertainty_score":0.99998367},"labels":[],"label_agreement":null},{"id":"W3023095508","doi":"","title":"Power Spot Price Models with negative Prices","year":2010,"lang":"en","type":"preprint","venue":"Munich Personal RePEc Archive (Ludwig Maximilian University of Munich)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Spot contract; Economics; Econometrics; Electricity; Financial economics; Futures contract","score_opus":0.00862246158875217,"score_gpt":0.1751815971876323,"score_spread":0.16655913559888014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3023095508","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37396365,0.0016539351,0.21806073,0.0003823583,0.0009219999,0.0028753872,0.0012996474,0.0014401977,0.39940208],"genre_scores_gemma":[0.9132082,0.0013332719,0.08264088,0.000031127955,0.00007137656,0.000006271719,0.0002919101,0.00019297612,0.0022239867],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99666256,0.000221858,0.00049190014,0.00096985284,0.00088071916,0.0007731416],"domain_scores_gemma":[0.9967518,0.00036029986,0.0005110229,0.0015710377,0.00043439266,0.0003714612],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.00039041732,0.0008319962,0.0010430283,0.0006781857,0.00032514485,0.000063587046,0.0020049596,0.00064562383,0.00031271452],"category_scores_gemma":[0.000067707435,0.0009551681,0.00038024338,0.00050327694,0.0005622179,0.0004626484,0.0011821972,0.0025772017,0.00002658061],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002001982,0.00092825096,0.0008169407,0.0035314467,0.004584159,0.0008029205,0.14928934,0.815404,0.0040208814,0.00746886,0.0067971717,0.004354079],"study_design_scores_gemma":[0.0029196907,0.0005603802,0.0031186903,0.0018954107,0.00052177074,0.00013911894,0.00852045,0.96219605,0.0006090293,0.0039064046,0.012905314,0.0027076872],"about_ca_topic_score_codex":0.0012074715,"about_ca_topic_score_gemma":0.0017078345,"teacher_disagreement_score":0.53924453,"about_ca_system_score_codex":0.00042086287,"about_ca_system_score_gemma":0.00049980805,"threshold_uncertainty_score":0.9997239},"labels":[],"label_agreement":null},{"id":"W3023110014","doi":"10.1016/j.engappai.2020.103666","title":"A novel and effective optimization algorithm for global optimization and its engineering applications: Turbulent Flow of Water-based Optimization (TFWO)","year":2020,"lang":"en","type":"article","venue":"Engineering Applications of Artificial Intelligence","topic":"Electric Power System Optimization","field":"Engineering","cited_by":155,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Computer science; Benchmark (surveying); Mathematical optimization; Robustness (evolution); Optimization problem; Engineering optimization; Meta-optimization; Convergence (economics); Global optimization; Algorithm; Continuous optimization; Multi-swarm optimization; Mathematics","score_opus":0.010096605850389384,"score_gpt":0.22195732920951977,"score_spread":0.2118607233591304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3023110014","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00016781785,0.00064736756,0.9960759,0.000089037945,0.000055540455,0.0025333748,0.00009898032,0.00032382985,0.000008125502],"genre_scores_gemma":[0.23023565,0.00012649238,0.76769936,0.000011116022,0.000087411296,0.0015906295,0.00018684212,0.00006153621,9.634472e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984323,0.0000125667075,0.00070466584,0.00039260637,0.00019076602,0.0002671236],"domain_scores_gemma":[0.9990131,0.00015698439,0.00012918387,0.00021552214,0.00034568628,0.00013947074],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018832879,0.00028972566,0.00035205486,0.00019192832,0.00007081176,0.00004639517,0.00018708552,0.00016098931,0.0000068046124],"category_scores_gemma":[0.00008500657,0.00032427075,0.000060608963,0.00082611403,0.00003305693,0.00021633501,0.0000346437,0.00010880947,0.0000011869276],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010354053,0.00004058284,0.0000017748346,0.00050200074,0.00004725253,8.970499e-8,0.00014717579,0.9766145,0.0056569516,0.0012639549,0.0000017117017,0.015713673],"study_design_scores_gemma":[0.00013156126,0.00008466744,0.0000017395467,0.000061882914,0.000060382532,0.0000040633936,0.000025182246,0.9186408,0.08065896,0.000021545553,0.00004985515,0.00025934537],"about_ca_topic_score_codex":0.0000039591823,"about_ca_topic_score_gemma":2.9930666e-7,"teacher_disagreement_score":0.23006783,"about_ca_system_score_codex":0.00010227447,"about_ca_system_score_gemma":0.000024409539,"threshold_uncertainty_score":0.99992096},"labels":[],"label_agreement":null},{"id":"W3025084936","doi":"","title":"Robust Optimal Dispatch of Power Systems with Wind Farm","year":2020,"lang":"pl","type":"article","venue":"Biuletyn Instytutu Techniki Cieplnej","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Economic dispatch; Electric power system; Control theory (sociology); Power (physics); Engineering; Electricity generation; Reliability (semiconductor); Reliability engineering; Computer science; Mathematical optimization; Control (management); Mathematics; Electrical engineering","score_opus":0.014459640926019892,"score_gpt":0.1789045376325704,"score_spread":0.1644448967065505,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3025084936","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025706596,0.004836154,0.55360353,0.00061276177,0.0014434035,0.003567952,0.0002975643,0.0018183629,0.43124965],"genre_scores_gemma":[0.9877047,0.00027351626,0.010736094,0.00014567278,0.00023570386,0.00014454871,0.00006665338,0.00034678946,0.00034634108],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9948081,0.00014520211,0.0015648388,0.0011022387,0.0012161974,0.0011634629],"domain_scores_gemma":[0.9971052,0.00011985975,0.0006512388,0.0011863344,0.00041331784,0.0005240667],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00047859317,0.0010156493,0.0014105034,0.0004418742,0.00018346147,0.00022697482,0.0011089392,0.0007562939,0.00012990437],"category_scores_gemma":[0.00014883776,0.0009884536,0.0002737431,0.0031124835,0.00021466626,0.00043933713,0.00023354481,0.00093067816,0.00014609775],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00087254593,0.0011442407,0.0107593825,0.008507503,0.0025886341,0.00074101,0.0058349855,0.07373512,0.024069404,0.8446616,0.024448536,0.0026370545],"study_design_scores_gemma":[0.0038530189,0.0026686348,0.0013738034,0.0020340094,0.000688017,0.00034959218,0.0013682083,0.18594094,0.0004955149,0.0000032053638,0.79842734,0.0027977198],"about_ca_topic_score_codex":0.00019664396,"about_ca_topic_score_gemma":0.000011849264,"teacher_disagreement_score":0.985134,"about_ca_system_score_codex":0.0004246303,"about_ca_system_score_gemma":0.00031080272,"threshold_uncertainty_score":0.9992566},"labels":[],"label_agreement":null},{"id":"W3030829271","doi":"10.1109/tste.2020.2998408","title":"A Fast Flexibility-Driven Generation Portfolio Planning Method for Sustainable Power Systems","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Group for Research in Decision Analysis","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Dispatchable generation; Variable renewable energy; Flexibility (engineering); Renewable energy; Portfolio; Computer science; Reliability engineering; Electric power system; Exploit; Electricity generation; Variable (mathematics); Mathematical optimization; Industrial engineering; Engineering; Power (physics); Distributed generation; Economics; Electrical engineering","score_opus":0.017486060836571962,"score_gpt":0.24935303497224895,"score_spread":0.23186697413567697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3030829271","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0006473424,0.0004445858,0.9919967,0.00010877265,0.00048911263,0.0008432061,0.00001648077,0.00086603896,0.004587766],"genre_scores_gemma":[0.98173004,0.000027170385,0.0054780534,0.00017836526,0.00017247125,0.0008175342,0.000038162645,0.00015174622,0.0114064645],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99755967,0.00011832689,0.00056734245,0.00054168515,0.00030420936,0.00090874464],"domain_scores_gemma":[0.9986215,0.00013126108,0.000095993,0.00037262432,0.00052139966,0.00025717798],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003462306,0.00037764886,0.00044198055,0.00039207394,0.00039725917,0.00023426051,0.00022705446,0.00024913944,0.000054649976],"category_scores_gemma":[0.000031361946,0.00042519273,0.00017161039,0.0010418509,0.000018983264,0.00062967994,0.0000027914873,0.00023602591,0.0000060893976],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006739722,0.000046401165,0.0000012593338,0.0004027818,0.0001297321,0.00006100195,0.0005842331,0.9843124,0.0015104173,0.006669428,0.005692908,0.000522049],"study_design_scores_gemma":[0.0007012772,0.00031549396,7.3574273e-7,0.000022486996,0.00006900526,0.000018230123,0.00378165,0.94047016,0.016957209,0.00006559911,0.03716839,0.00042978997],"about_ca_topic_score_codex":0.00027297612,"about_ca_topic_score_gemma":0.000006033661,"teacher_disagreement_score":0.9865186,"about_ca_system_score_codex":0.00073215086,"about_ca_system_score_gemma":0.00017961998,"threshold_uncertainty_score":0.99982},"labels":[],"label_agreement":null},{"id":"W3031255211","doi":"10.1109/tpwrs.2020.2998490","title":"Participation of Pumped Hydro Storage in Energy and Performance-Based Regulation Markets","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Taif University","keywords":"Market clearing; Linear programming; Energy storage; Profit (economics); Integer programming; Demand response; Clearing; Stochastic programming; Mathematical optimization; Energy management; Computer science; Operations research; Economics; Engineering; Microeconomics; Energy (signal processing); Electricity; Power (physics); Mathematics","score_opus":0.009682630743684615,"score_gpt":0.18894428241055528,"score_spread":0.17926165166687066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3031255211","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24386345,0.00012564751,0.7546694,0.000028751727,0.00044244784,0.00020650489,0.00000831051,0.00013122837,0.00052425574],"genre_scores_gemma":[0.9997157,0.00003494465,0.00006991867,0.000017882003,0.00000805103,0.000077954115,0.000005182528,0.000032009037,0.00003839351],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989476,0.00008991174,0.00042353902,0.00017410111,0.00019777581,0.00016703899],"domain_scores_gemma":[0.99959654,0.000057076908,0.00007138186,0.0001558778,0.000040493433,0.000078630095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014168881,0.00014408141,0.00022693463,0.00021886815,0.000032740067,0.000020506717,0.000059005633,0.000104394516,0.00002173807],"category_scores_gemma":[0.0000040185823,0.0001586501,0.00003327085,0.00047248777,0.000014897982,0.00019564388,3.5395126e-7,0.00008548845,0.0000037702157],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000073014715,0.000029659559,0.00013335189,0.0002076598,0.000020531716,0.0000011200592,0.0003868774,0.99460196,0.0036848716,0.000015180215,0.000059978323,0.0007857803],"study_design_scores_gemma":[0.000564344,0.00014334936,0.0013868848,0.000113125214,0.000015669739,0.0000016266264,0.000022678796,0.97392124,0.023486592,6.1829473e-7,0.00020365893,0.00014021382],"about_ca_topic_score_codex":0.000024719418,"about_ca_topic_score_gemma":0.000011952275,"teacher_disagreement_score":0.7558522,"about_ca_system_score_codex":0.00009835067,"about_ca_system_score_gemma":0.000021074713,"threshold_uncertainty_score":0.6469563},"labels":[],"label_agreement":null},{"id":"W3035845532","doi":"10.18280/jesa.530217","title":"Comparison of Results of Economic Load Dispatch Using Various Meta-Heuristic Techniques","year":2020,"lang":"fr","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Meta heuristic; Economic dispatch; Heuristic; Computer science; Mathematical optimization; Operations research; Artificial intelligence; Engineering; Mathematics; Algorithm; Electric power system","score_opus":0.04522955140843658,"score_gpt":0.29439704863489347,"score_spread":0.24916749722645687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3035845532","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10473037,0.08833752,0.7953665,0.0009138588,0.002710124,0.0011066169,0.00035422837,0.00062548096,0.005855255],"genre_scores_gemma":[0.90159225,0.00081092474,0.09689319,0.000014495898,0.00033478902,0.0000049478326,0.0000054035113,0.00013631678,0.00020769192],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9945892,0.00068440975,0.0032035236,0.00035510492,0.0005971113,0.0005706392],"domain_scores_gemma":[0.9962187,0.00035946743,0.0022537913,0.00040343674,0.0004304057,0.00033424015],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011211084,0.0005170355,0.0019860766,0.0002748533,0.00013337079,0.00014801291,0.000559449,0.00026459413,0.000140391],"category_scores_gemma":[0.00064963684,0.0005230114,0.0005073799,0.0006176483,0.00016735976,0.0005256936,0.000117136784,0.00062174315,0.000037160826],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017154696,0.00025006288,0.0034785438,0.0058889566,0.0050234166,0.0001339891,0.0074979994,0.89969504,0.01380331,0.0012805825,0.009075406,0.05370112],"study_design_scores_gemma":[0.0008246439,0.0007009499,0.005047555,0.0013830522,0.0029706317,0.00064874766,0.000109440705,0.96543616,0.020616874,0.00046020746,0.0012947422,0.0005070004],"about_ca_topic_score_codex":0.0007366509,"about_ca_topic_score_gemma":0.00003185922,"teacher_disagreement_score":0.7968619,"about_ca_system_score_codex":0.0012844402,"about_ca_system_score_gemma":0.00051534123,"threshold_uncertainty_score":0.9997221},"labels":[],"label_agreement":null},{"id":"W3036163467","doi":"10.1049/iet-rpg.2019.1127","title":"Robust optimisation framework for SCED problem in mixed AC‐HVDC power systems with wind uncertainty","year":2020,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Electric Power System Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electric power system; Wind power; Computer science; Mathematical optimization; Power system simulation; Power (physics); Operations research; Control theory (sociology); Reliability engineering; Electrical engineering; Engineering; Mathematics; Artificial intelligence; Physics","score_opus":0.025973835670583242,"score_gpt":0.20937779849932328,"score_spread":0.18340396282874005,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3036163467","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035108194,0.00055756397,0.959731,0.00037322537,0.00080793776,0.0018703452,0.000024704676,0.00040435934,0.001122696],"genre_scores_gemma":[0.9311945,0.000030949017,0.06761327,0.00010698536,0.00020992145,0.00029407075,0.00030674264,0.0001095594,0.0001340128],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979854,0.000095330135,0.00060054,0.0005038576,0.00034773783,0.00046710018],"domain_scores_gemma":[0.99909055,0.00007832457,0.0001540201,0.000312146,0.00021485913,0.0001501199],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00034877303,0.00034209678,0.00038537933,0.00016986366,0.00010529415,0.00023902197,0.00018096562,0.00030925564,0.00003265539],"category_scores_gemma":[0.000098420795,0.00033634898,0.000057451805,0.0008146505,0.00001776666,0.00044612942,0.000016284073,0.00018991552,0.0000121005405],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006825001,0.000026262785,0.00018998179,0.00011487197,0.00005201191,0.00000253627,0.00091168104,0.98288596,0.011072535,0.00062229886,0.0040034465,0.00005016923],"study_design_scores_gemma":[0.0010747546,0.00032120832,0.000055011726,0.00015271113,0.000029526736,0.0000065473455,0.00020818814,0.98824173,0.0070647905,0.00006120108,0.0023248491,0.0004594506],"about_ca_topic_score_codex":0.0001288332,"about_ca_topic_score_gemma":0.00018593599,"teacher_disagreement_score":0.8960863,"about_ca_system_score_codex":0.00030388302,"about_ca_system_score_gemma":0.00011495118,"threshold_uncertainty_score":0.99990886},"labels":[],"label_agreement":null},{"id":"W3036981922","doi":"","title":"Developments in Utilities Prices | Bulletin – December Quarter 2010","year":2010,"lang":"en","type":"article","venue":"Philadelphia Museum of Art Bulletin","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Advertising; Business; Geography","score_opus":0.006395618936231091,"score_gpt":0.19170116378317095,"score_spread":0.18530554484693987,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3036981922","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47520953,0.002744824,0.016344005,0.2435544,0.019894365,0.0057919123,0.00015154628,0.0044777957,0.23183161],"genre_scores_gemma":[0.9925963,0.00006363554,0.0067419615,0.00009702969,0.000087758985,0.00007208845,0.000024704344,0.00006497494,0.00025150078],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99811614,0.000037278136,0.0007196834,0.00030929103,0.00032726707,0.0004903508],"domain_scores_gemma":[0.9991695,0.00012849673,0.00011425457,0.0003879872,0.00009163044,0.000108129745],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00039584364,0.00029629373,0.00037559393,0.0003560297,0.000044555014,0.00003830115,0.00032913673,0.00021594764,0.0014864235],"category_scores_gemma":[0.000080557664,0.00031415056,0.00006980753,0.00032163624,0.00006332274,0.00008136171,0.000052549403,0.00044217863,0.0009168195],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009035408,0.00032421204,0.0052961605,0.0005664407,0.00016879405,0.000031653675,0.0035656893,0.0062603406,0.015785383,0.0013792224,0.9662884,0.00024334171],"study_design_scores_gemma":[0.0009817706,0.000053313437,0.013308323,0.0001332612,0.00001692178,0.000037170128,0.00011843171,0.0023563742,0.0057794657,0.000045137225,0.97655743,0.00061240274],"about_ca_topic_score_codex":0.00005440943,"about_ca_topic_score_gemma":0.00017404383,"teacher_disagreement_score":0.5173868,"about_ca_system_score_codex":0.000051009814,"about_ca_system_score_gemma":0.000037774433,"threshold_uncertainty_score":0.99993104},"labels":[],"label_agreement":null},{"id":"W3037752876","doi":"10.3390/electronics9061043","title":"Optimal Power Flow Incorporating FACTS Devices and Stochastic Wind Power Generation Using Krill Herd Algorithm","year":2020,"lang":"en","type":"article","venue":"Electronics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Wind power; Electric power system; Mathematical optimization; Weibull distribution; Minification; Electricity generation; Heuristic; Power (physics); Engineering; Turbine; Computer science; Control theory (sociology); Mathematics; Electrical engineering; Statistics","score_opus":0.0120506185980204,"score_gpt":0.2103611781873465,"score_spread":0.1983105595893261,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3037752876","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21261391,0.0063282936,0.78009,0.00007009907,0.00021077732,0.00026504233,0.000008265247,0.00026482073,0.00014878884],"genre_scores_gemma":[0.9497529,0.00003612674,0.049793076,0.000110784786,0.00017728831,0.0000045946927,0.000038865222,0.000077286095,0.0000090228905],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99866253,0.000042867316,0.00031924187,0.0003034287,0.00023028092,0.00044164472],"domain_scores_gemma":[0.9995244,0.000030039875,0.00008976412,0.0001365022,0.0000764825,0.00014280439],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014012257,0.00025627666,0.00024364429,0.00007982684,0.0001264806,0.00013107047,0.00010584272,0.00013745324,0.00002295908],"category_scores_gemma":[0.000044431505,0.00028586693,0.000035470737,0.0003844764,0.000016370926,0.00038009087,0.000033052806,0.00028300943,0.000011938917],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000044160083,0.0000072003586,0.000029502524,0.000018046117,0.000056530185,0.0000051053617,0.0005295311,0.98590547,0.010684371,0.00006420539,0.00014233324,0.0025532686],"study_design_scores_gemma":[0.00028454515,0.00016758316,0.000025443609,0.000017820797,0.000028874441,0.000032592303,0.000039195405,0.9962308,0.002330267,0.0000089285595,0.00053317833,0.00030081114],"about_ca_topic_score_codex":0.0000030193976,"about_ca_topic_score_gemma":0.0000110526835,"teacher_disagreement_score":0.73713905,"about_ca_system_score_codex":0.00022699812,"about_ca_system_score_gemma":0.00010379747,"threshold_uncertainty_score":0.99995935},"labels":[],"label_agreement":null},{"id":"W3039325686","doi":"10.37867/te100102","title":"AN ANALYSIS OF POWER SECTOR REFORMS IN INDIA AND CANADA","year":2018,"lang":"en","type":"article","venue":"Towards Excellence","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Manitoba Hydro","keywords":"Hydroelectricity; Electrification; Hydropower; Nova scotia; Electricity; Rural electrification; Electric power industry; Geography; Economy; Agricultural economics; Engineering; Archaeology; Economics","score_opus":0.0038794035847371585,"score_gpt":0.1967492161279488,"score_spread":0.19286981254321164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3039325686","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9893388,0.00016260994,0.0034882887,0.0000067720307,0.00013081619,0.00006953388,0.000011780142,0.000037804213,0.006753609],"genre_scores_gemma":[0.999555,0.000035945952,0.00032980097,0.000012354549,0.00001350144,0.000003530628,0.0000050210806,0.000009987536,0.000034867346],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99937785,0.000015772264,0.00018665446,0.00012467965,0.00014362072,0.00015143586],"domain_scores_gemma":[0.9996638,0.000011688319,0.000030954267,0.000199374,0.000040792813,0.000053395743],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001223443,0.0000799215,0.00017917067,0.00022102288,0.00001349791,0.0000075225116,0.00011171551,0.000044161843,0.0000868479],"category_scores_gemma":[0.000013299999,0.00007402698,0.000013423205,0.00067703775,0.00002302141,0.00009442846,0.000010765213,0.00005094087,8.949706e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012629724,0.00021315782,0.7126448,0.0006698478,0.0018386712,0.00011373882,0.025994837,0.19754717,0.034469564,0.00092878414,0.0032734373,0.022179682],"study_design_scores_gemma":[0.00022499914,0.00012577494,0.6005905,0.000036830003,0.000074584445,0.0000030550093,0.00023483581,0.38754198,0.01062049,0.000013558718,0.0002595641,0.00027379196],"about_ca_topic_score_codex":0.22561501,"about_ca_topic_score_gemma":0.31918997,"teacher_disagreement_score":0.18999483,"about_ca_system_score_codex":0.00014276132,"about_ca_system_score_gemma":0.00008002861,"threshold_uncertainty_score":0.7795417},"labels":[],"label_agreement":null},{"id":"W3042602291","doi":"","title":"Abstract for Developments in Utilities Prices | Bulletin – December Quarter 2010","year":2010,"lang":"en","type":"article","venue":"Philadelphia Museum of Art Bulletin","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); History","score_opus":0.009558937259255919,"score_gpt":0.21120488759602432,"score_spread":0.2016459503367684,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3042602291","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5365944,0.0026157654,0.04309383,0.27034074,0.022461716,0.012326884,0.00046480316,0.004187234,0.10791467],"genre_scores_gemma":[0.988114,0.000040057435,0.011236685,0.000074931595,0.000104113715,0.00017327894,0.000042791005,0.000069392896,0.0001447371],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99822176,0.000015514614,0.00072917447,0.0003001065,0.00025059894,0.00048283723],"domain_scores_gemma":[0.99911815,0.00022265787,0.00013177253,0.00032099354,0.000111672896,0.000094780466],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0004460942,0.00028100167,0.0003640826,0.00029642595,0.000048682985,0.000038760096,0.0002898455,0.00021573914,0.00097150565],"category_scores_gemma":[0.00010795625,0.00029833458,0.00008737103,0.0001976946,0.00004820281,0.00007977365,0.000030633502,0.00032396062,0.0003355179],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015050902,0.0003072851,0.0017285614,0.0010256432,0.00016632468,0.000010591414,0.002180075,0.0060264366,0.020442974,0.0008523756,0.9667911,0.00031813476],"study_design_scores_gemma":[0.0013961273,0.000063790474,0.019134903,0.00015480576,0.000019185476,0.000017057797,0.000113788024,0.0025224665,0.0075596087,0.00008310938,0.9683122,0.00062295137],"about_ca_topic_score_codex":0.00003814647,"about_ca_topic_score_gemma":0.00015447462,"teacher_disagreement_score":0.45151964,"about_ca_system_score_codex":0.00004720692,"about_ca_system_score_gemma":0.000039655246,"threshold_uncertainty_score":0.9999469},"labels":[],"label_agreement":null},{"id":"W3043999073","doi":"10.1007/978-3-030-44484-6_10","title":"Power System Development and Economics","year":2020,"lang":"en","type":"book-chapter","venue":"CIGRE green books","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kinectrics (Canada)","funders":"","keywords":"Power (physics); Economics; Physics; Thermodynamics","score_opus":0.009105242002353202,"score_gpt":0.1515839196401592,"score_spread":0.14247867763780597,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3043999073","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00011932716,0.0022501806,0.004409902,0.000020092306,0.00050982635,0.0003925297,0.000022651533,0.000658259,0.9916172],"genre_scores_gemma":[0.15559079,0.0003038251,0.0051170113,0.0002267528,0.0007462816,0.0000800835,0.00021137753,0.00092620566,0.83679765],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989037,0.000005329922,0.0004452443,0.00033415467,0.000105763575,0.00020580398],"domain_scores_gemma":[0.9994253,0.000019708996,0.00010573866,0.0002615219,0.000033976135,0.000153747],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000068859,0.00039121494,0.0004511092,0.00013317924,0.0000521757,0.000049890674,0.00016012903,0.0003452235,0.000039786024],"category_scores_gemma":[0.0000016985882,0.0004537678,0.00005839015,0.0000118570115,0.000020624258,0.000058744405,0.00006221963,0.00026149832,0.00027748392],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000061952196,0.000011141824,0.00012424422,0.008595795,0.0034893225,0.0005829051,0.0054157157,0.004598807,0.000059771795,0.84712195,0.026695607,0.10324279],"study_design_scores_gemma":[0.00037673398,0.000045717683,0.000023418585,0.0006495831,0.00008206434,0.00011955889,0.000026283138,0.011236,0.00017099887,0.0002834469,0.9858478,0.0011384359],"about_ca_topic_score_codex":0.0000023550404,"about_ca_topic_score_gemma":0.000012781281,"teacher_disagreement_score":0.95915216,"about_ca_system_score_codex":0.00037738716,"about_ca_system_score_gemma":0.000072118586,"threshold_uncertainty_score":0.9997914},"labels":[],"label_agreement":null},{"id":"W3084139598","doi":"10.1016/j.ijepes.2020.106419","title":"An optimization model to maximize energy generation in short-term hydropower unit commitment using efficiency points","year":2020,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Rio Tinto (Canada); Group for Research in Decision Analysis; HEC Montréal; Université du Québec à Chicoutimi","funders":"Mitacs","keywords":"Hydropower; Term (time); Mathematical optimization; Turbine; Power system simulation; Integer (computer science); Power (physics); Energy storage; Volume (thermodynamics); Electricity generation; Maximum power principle; Unit (ring theory); Function (biology); Environmental science; Computer science; Mathematics; Engineering; Electric power system; Electrical engineering; Physics; Mechanical engineering","score_opus":0.02913703953905076,"score_gpt":0.2661440574084834,"score_spread":0.23700701786943265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3084139598","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03615418,0.00054173695,0.96103245,0.00018551771,0.0013233575,0.0001363167,0.000007902647,0.000074804484,0.0005437097],"genre_scores_gemma":[0.99386215,0.00009802794,0.0050224275,0.00031732192,0.0005497415,0.000012666255,0.000043623768,0.00007594556,0.00001808543],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.996756,0.00020891869,0.0013217579,0.00031482233,0.001007274,0.00039121186],"domain_scores_gemma":[0.998541,0.000046857727,0.00020166964,0.00020104318,0.0006357521,0.00037368774],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00035281022,0.00031656725,0.00047433106,0.0008065368,0.0000471257,0.00020671292,0.0007002635,0.00018068415,0.000023677632],"category_scores_gemma":[0.00007784087,0.0003192952,0.000120433266,0.00088413054,0.000014581561,0.0006126344,0.00003940856,0.0002452043,0.0000025743013],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008708519,0.00013945898,0.00019565469,0.0000045095057,0.000106935215,0.00007215564,0.00021116059,0.98181987,0.014709406,0.0019513514,0.00044642747,0.000256016],"study_design_scores_gemma":[0.0006488714,0.00032866406,0.00001547911,0.0000603904,0.000022682245,0.00013453893,0.000017015773,0.9955506,0.0024186533,0.000013200767,0.0004848093,0.00030514164],"about_ca_topic_score_codex":0.00008643529,"about_ca_topic_score_gemma":0.000011826413,"teacher_disagreement_score":0.957708,"about_ca_system_score_codex":0.00085812074,"about_ca_system_score_gemma":0.00016388179,"threshold_uncertainty_score":0.9999259},"labels":[],"label_agreement":null},{"id":"W3084981120","doi":"10.1111/jems.12445","title":"Vertical integration and capacity investment in the electricity sector","year":2021,"lang":"en","type":"preprint","venue":"Journal of Economics & Management Strategy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund","keywords":"Vertical integration; Electricity; Incentive; Investment (military); Industrial organization; Welfare; Economics; Economic surplus; Business; Microeconomics; Market economy; Engineering","score_opus":0.02422457649008214,"score_gpt":0.21144823425950765,"score_spread":0.1872236577694255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3084981120","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9728285,0.000828649,0.018459266,0.00012428944,0.0005446187,0.00035769874,0.0000022735542,0.00001427436,0.0068404316],"genre_scores_gemma":[0.99586415,0.002604526,0.0012652708,0.00011049031,0.000102249425,0.000014810973,0.000009964385,0.000018682309,0.000009844574],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998729,0.00011075969,0.0007150566,0.00016567782,0.000093356924,0.00018614664],"domain_scores_gemma":[0.9994666,0.000050200157,0.00017502776,0.00021010387,0.000048357222,0.000049741488],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006932058,0.0002025309,0.00034823766,0.0002764742,0.000023288554,0.00028215128,0.00025842595,0.0001403321,0.000010937921],"category_scores_gemma":[0.000014850611,0.00017410489,0.000083525185,0.00013174191,0.000016446997,0.00019560316,0.00006359898,0.00066003756,8.996922e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023056224,0.00011482817,0.00039658873,0.00043397644,0.00051181053,0.000070257614,0.0008071803,0.97286665,0.00012232551,0.020162117,0.0008126171,0.0036785987],"study_design_scores_gemma":[0.001424979,0.00028421322,0.022745831,0.00052192964,0.0003919996,0.00015301123,0.0012874355,0.9518851,0.001189736,0.01882814,0.00054640725,0.0007412358],"about_ca_topic_score_codex":0.000026302861,"about_ca_topic_score_gemma":0.00016002727,"teacher_disagreement_score":0.023035662,"about_ca_system_score_codex":0.0004976187,"about_ca_system_score_gemma":0.000052374224,"threshold_uncertainty_score":0.7099792},"labels":[],"label_agreement":null},{"id":"W3087617280","doi":"10.1016/j.tej.2020.106848","title":"Rising market concentration in Texas’s retail electricity market","year":2020,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Expansive; Competition (biology); Electricity retailing; Retail market; Electricity market; Market concentration; Market power; Electricity; Business; Market economy; Commerce; Market structure; Wholesale market; Industrial organization; Economics; Marketing; Monopoly; Engineering","score_opus":0.010654029213831219,"score_gpt":0.1967203963961414,"score_spread":0.18606636718231018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3087617280","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39199594,0.009842015,0.4856802,0.0056811078,0.0011250778,0.0015588001,0.000008676084,0.0009581683,0.10315004],"genre_scores_gemma":[0.9975608,0.0009699686,0.00034897865,0.00040993842,0.00042044825,0.0000054669918,0.0000024486733,0.00005022676,0.0002317481],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974601,0.00046747192,0.00066907756,0.00021852984,0.00047882987,0.00070596044],"domain_scores_gemma":[0.9990945,0.00023789909,0.00018645829,0.00018619311,0.00010894876,0.00018599704],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013459037,0.00026371158,0.0003371785,0.00015871783,0.00020280931,0.00021589769,0.00045925422,0.00014051521,0.00040846583],"category_scores_gemma":[0.0004259854,0.00022109368,0.000099747296,0.0020429536,0.000023915254,0.00039690916,0.000021926176,0.0012310101,0.000029301971],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014567416,0.00028718135,0.053724278,0.0003491401,0.00075365975,0.00041674203,0.004418326,0.22273876,0.04687472,0.0006283489,0.5800429,0.088309206],"study_design_scores_gemma":[0.00096727884,0.00015509636,0.008408359,0.00004496564,0.000045919754,0.00032931435,0.000022678068,0.9785608,0.0077329306,0.00025293216,0.0031118165,0.00036789937],"about_ca_topic_score_codex":0.0000148270565,"about_ca_topic_score_gemma":0.00001372015,"teacher_disagreement_score":0.75582206,"about_ca_system_score_codex":0.0005511958,"about_ca_system_score_gemma":0.00013249002,"threshold_uncertainty_score":0.90159386},"labels":[],"label_agreement":null},{"id":"W3088725794","doi":"10.1109/tste.2020.3026370","title":"Addressing the Conditional and Correlated Wind Power Forecast Errors in Unit Commitment by Distributionally Robust Optimization","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Sustainable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"National Science Foundation","keywords":"Mathematical optimization; Semidefinite programming; Robust optimization; Covariance matrix; Robustness (evolution); Power system simulation; Wind power; Stochastic programming; Estimator; Ambiguity; Covariance; Mathematics; Integer programming; Optimization problem; Computer science; Electric power system; Algorithm; Power (physics); Statistics; Engineering","score_opus":0.021030977848580493,"score_gpt":0.2130901661902146,"score_spread":0.1920591883416341,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3088725794","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035137264,0.00026461462,0.9940854,0.00068026315,0.00013109563,0.0002378459,0.00008890731,0.00015663814,0.00084152474],"genre_scores_gemma":[0.99866486,0.000072997806,0.00027204104,0.00019322087,0.000014948834,0.000061094346,0.00022375985,0.000038890892,0.00045816068],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988668,0.000076743934,0.00029343012,0.00021626953,0.00021955966,0.00032721853],"domain_scores_gemma":[0.9995033,0.00010282092,0.00005045636,0.0001223551,0.00011615013,0.00010489807],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011080935,0.00019735706,0.00016465408,0.00012478506,0.00026310218,0.000078945995,0.0001112712,0.00012621941,0.00014951457],"category_scores_gemma":[0.000010560869,0.00018698027,0.00003814142,0.0007621476,0.00005570698,0.00028583,0.0000021421688,0.00025239517,0.0000021562828],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003663236,0.000045219702,0.000017559501,0.000024708677,0.0000459966,0.000012088382,0.00018798538,0.9968686,0.00004937134,0.0007440296,0.0017693485,0.00019846886],"study_design_scores_gemma":[0.0008374776,0.00009168755,0.000046050143,0.0000300839,0.00002826706,0.000015240645,0.0008259065,0.99302185,0.0013656778,0.00004955485,0.0034603262,0.00022787589],"about_ca_topic_score_codex":0.000076377684,"about_ca_topic_score_gemma":0.000018650544,"teacher_disagreement_score":0.99515116,"about_ca_system_score_codex":0.00029960822,"about_ca_system_score_gemma":0.00006309776,"threshold_uncertainty_score":0.7624834},"labels":[],"label_agreement":null},{"id":"W3092464541","doi":"10.5547/01956574.41.si1.dolm","title":"Offer Price Information and the Exercise of Market Power: The Effect of the Publication of the Historical Trading Report on Competition in the Alberta Electricity Market","year":2020,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University; University of Calgary","funders":"","keywords":"Electricity; Competition (biology); Electricity market; Market power; Economics; Electricity price; Business; Agricultural economics; Microeconomics; Engineering","score_opus":0.003044185735312914,"score_gpt":0.16255974847575128,"score_spread":0.15951556274043835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3092464541","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77934474,0.003600345,0.042121496,0.049640734,0.0021699169,0.0036261694,0.000013428129,0.00008797078,0.1193952],"genre_scores_gemma":[0.9994742,0.00017994351,0.000010206906,0.00015329229,0.00005017398,0.000020197693,0.0000016898041,0.0000112074995,0.00009904127],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974956,0.0010577104,0.0006936853,0.000075485885,0.00052573695,0.00015178145],"domain_scores_gemma":[0.9977072,0.0010883772,0.00066583935,0.0004140787,0.00009985262,0.00002466282],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031822275,0.00013720884,0.00024245374,0.00006917793,0.00018366345,0.00004834245,0.0006538863,0.000065704386,0.000024876721],"category_scores_gemma":[0.00086489035,0.000048892154,0.0001287466,0.00087782135,0.0000772253,0.00021128055,0.00004191525,0.00042318454,2.042151e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.01149317,0.0005788488,0.037369594,0.0018204647,0.0019573548,0.000014042086,0.09763398,0.3307366,0.010679568,0.092389435,0.36518657,0.050140396],"study_design_scores_gemma":[0.005040308,0.0006892646,0.10019491,0.0007581027,0.00057011994,0.001326096,0.0006143689,0.846285,0.021616407,0.0009235515,0.021489969,0.0004919184],"about_ca_topic_score_codex":0.0001340714,"about_ca_topic_score_gemma":0.000018481185,"teacher_disagreement_score":0.5155484,"about_ca_system_score_codex":0.00017458372,"about_ca_system_score_gemma":0.00004385667,"threshold_uncertainty_score":0.19937642},"labels":[],"label_agreement":null},{"id":"W3092695888","doi":"10.1016/j.energy.2020.119092","title":"Risk-constrained stochastic market operation strategies for wind power producers and energy storage systems","year":2020,"lang":"en","type":"article","venue":"Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; Teshmont (Canada)","funders":"","keywords":"Backup; Stochastic programming; Wind power; Profit (economics); Energy storage; Renewable energy; Environmental economics; Electric power system; Computer science; Operations research; Economics; Mathematical optimization; Microeconomics; Reliability engineering; Business; Power (physics); Engineering; Mathematics; Electrical engineering","score_opus":0.005557229378387097,"score_gpt":0.17835800699770482,"score_spread":0.17280077761931772,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3092695888","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0052011157,0.0014312835,0.98828816,0.00007608049,0.00054858543,0.00016373159,0.000033955326,0.00031289036,0.003944189],"genre_scores_gemma":[0.9987541,0.00003988062,0.00048023366,0.000040945004,0.00020298829,0.00006903024,0.000038172977,0.0000523569,0.000322288],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990855,0.00005866734,0.00024556523,0.00026481407,0.00012199727,0.00022349051],"domain_scores_gemma":[0.9995786,0.00006715594,0.00006077586,0.00013586483,0.000053327887,0.00010425278],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011885986,0.00018547627,0.00020937683,0.000072330644,0.0000760744,0.00014852862,0.00008370277,0.00009219537,0.000022093966],"category_scores_gemma":[0.00005504342,0.00019070254,0.000029789791,0.00016202101,0.000020232324,0.0002561393,0.000011894199,0.000060547896,0.0000010473898],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023537847,0.000005264234,0.000004320061,0.000059891452,0.00006817343,0.0000019267352,0.00037663078,0.9851085,0.0016985367,0.0081719095,0.0038965247,0.0005847943],"study_design_scores_gemma":[0.0004438673,0.00012443065,0.000021416725,0.000021662454,0.000026936406,0.000009125401,0.00032543525,0.99282455,0.00029172035,0.000039210765,0.0056353696,0.00023627184],"about_ca_topic_score_codex":0.000075511474,"about_ca_topic_score_gemma":0.000019583826,"teacher_disagreement_score":0.993553,"about_ca_system_score_codex":0.000060402992,"about_ca_system_score_gemma":0.00005949222,"threshold_uncertainty_score":0.7776624},"labels":[],"label_agreement":null},{"id":"W3097377773","doi":"10.1016/j.segan.2020.100405","title":"A novel simulation-based method for assessment of collusion potential in wholesale electricity markets","year":2020,"lang":"en","type":"article","venue":"Sustainable Energy Grids and Networks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University; University of Calgary","funders":"","keywords":"Collusion; Shapley value; Bidding; Oligopoly; Electricity market; Microeconomics; Profit (economics); Economics; Electricity; Incentive compatibility; Core (optical fiber); Allocative efficiency; Computer science; Incentive; Industrial organization; Game theory; Cournot competition","score_opus":0.0062730336050743855,"score_gpt":0.23842696458132207,"score_spread":0.23215393097624767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3097377773","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035762542,0.0005361941,0.99518543,0.00006721811,0.00007134388,0.00029380317,0.0000034282168,0.00006321846,0.00020311766],"genre_scores_gemma":[0.98246306,0.000052679356,0.017130282,0.000073202675,0.00009747036,0.00005625422,0.000031977197,0.000030593026,0.00006450514],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99901634,0.000047769634,0.00029627496,0.00019535019,0.00011670426,0.00032757845],"domain_scores_gemma":[0.99937826,0.00026342508,0.00006630492,0.00008912935,0.00013124972,0.00007161436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003255356,0.0001371195,0.0002513476,0.00012211342,0.00006000215,0.000025758744,0.00007380003,0.00012762507,0.0000047267536],"category_scores_gemma":[0.000048776415,0.00014680483,0.000045094665,0.0006736211,0.0000089059695,0.00008854081,0.000024548044,0.000096359414,1.4654415e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000070418464,0.000026956775,0.00022358396,0.00019322603,0.000018348463,0.0000040680443,0.000019115316,0.99507844,0.0005688343,0.0012140139,0.00015055241,0.0024324437],"study_design_scores_gemma":[0.0011359135,0.00011276749,0.00057282555,0.000024099112,0.00001909803,3.2494452e-7,0.000044636206,0.9966858,0.0003580559,0.000057563113,0.00084257935,0.00014632104],"about_ca_topic_score_codex":0.000095449956,"about_ca_topic_score_gemma":0.000014867668,"teacher_disagreement_score":0.9788868,"about_ca_system_score_codex":0.00013394545,"about_ca_system_score_gemma":0.00008350096,"threshold_uncertainty_score":0.5986527},"labels":[],"label_agreement":null},{"id":"W3109679710","doi":"10.2139/ssrn.3742136","title":"The Economics of the Site C Hydroelectric Project in British Columbia","year":2020,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa; University of Calgary; University of Regina","funders":"","keywords":"Hydroelectricity; Geography; Archaeology; Engineering","score_opus":0.0035723519576882244,"score_gpt":0.16208455191253032,"score_spread":0.1585121999548421,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3109679710","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9870919,0.0072983573,0.0035222324,0.00038908745,0.000268599,0.000437149,0.00000366815,0.00006245602,0.0009265655],"genre_scores_gemma":[0.9908679,0.008682537,0.000019053461,0.000038456154,0.00010381592,0.0000088951865,9.935711e-7,0.000033928474,0.0002444315],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981208,0.00009202099,0.00040807892,0.00011497274,0.00012478718,0.0011393285],"domain_scores_gemma":[0.9996091,0.0000557542,0.00012640218,0.00013907946,0.000035503228,0.00003412155],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007234004,0.000085971886,0.00016930093,0.000035056437,0.00014712106,0.00017329725,0.00037093024,0.00006242179,0.000003622601],"category_scores_gemma":[0.00008640634,0.00009101781,0.000090835885,0.0007169655,0.000023194803,0.00012515057,0.000024950336,0.0011892227,0.0000035699718],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012358693,0.00019128984,0.18277305,0.0002725345,0.0015238246,0.000025855566,0.00351642,0.51985747,0.004165051,0.008864119,0.016855167,0.26183164],"study_design_scores_gemma":[0.0041504796,0.0011764672,0.014846138,0.00021137432,0.00014809835,0.0025495114,0.0014057445,0.9347024,0.00082545145,0.024350433,0.014468862,0.0011650637],"about_ca_topic_score_codex":0.0010386473,"about_ca_topic_score_gemma":0.114003055,"teacher_disagreement_score":0.41484493,"about_ca_system_score_codex":0.00078497187,"about_ca_system_score_gemma":0.000969337,"threshold_uncertainty_score":0.9021641},"labels":[],"label_agreement":null},{"id":"W3109768257","doi":"10.1007/s41403-020-00185-9","title":"BMFO-SIG: A Novel Binary Moth Flame Optimizer Algorithm with Sigmoidal Transformation for Combinatorial Unit Commitment and Numerical Optimization Problems","year":2020,"lang":"en","type":"article","venue":"Transactions of Indian National Academy of Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Mathematical optimization; Power system simulation; Computer science; Renewable energy; Heuristics; Wind power; Operating cost; Scheduling (production processes); Electric power system; Power (physics); Engineering; Mathematics; Electrical engineering","score_opus":0.014520848195331348,"score_gpt":0.21305392386328786,"score_spread":0.19853307566795653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3109768257","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018117864,0.00012701681,0.9964931,0.0002661241,0.00007041637,0.00084718765,0.00015956738,0.00016171737,0.000063055566],"genre_scores_gemma":[0.83943164,0.000060614504,0.16019498,0.000017012468,0.000046413552,0.00013137242,0.00006479926,0.00005016943,0.0000029784621],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99871594,0.000012253001,0.00052280334,0.0001806057,0.00036560043,0.00020277945],"domain_scores_gemma":[0.99947363,0.00012826864,0.000103009064,0.000037921454,0.00013782851,0.00011932641],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013929802,0.00021938814,0.000309809,0.00026079745,0.000059767266,0.00001775806,0.00012250786,0.00017651128,0.000012285088],"category_scores_gemma":[0.000017900935,0.00023754491,0.000066340144,0.0006121722,0.00003099518,0.00048255993,0.0000025615338,0.00023754124,3.9439573e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044627737,0.00005647587,0.0000051497586,0.0004943468,0.00014917224,1.5178718e-7,0.00068582885,0.99379766,0.0036946684,0.00054006017,0.000010313499,0.0005215537],"study_design_scores_gemma":[0.0022014952,0.00025919444,0.00006088994,0.00010087202,0.000053738546,0.000015220118,0.000041673586,0.98567,0.011248541,0.00001586488,0.00010498239,0.00022753375],"about_ca_topic_score_codex":0.0000045889033,"about_ca_topic_score_gemma":1.041946e-7,"teacher_disagreement_score":0.83761984,"about_ca_system_score_codex":0.00008807783,"about_ca_system_score_gemma":0.000040353105,"threshold_uncertainty_score":0.96868},"labels":[],"label_agreement":null},{"id":"W3110512617","doi":"10.1109/oajpe.2020.3031526","title":"Energy Storage as a Service: Optimal Pricing for Transmission Congestion Relief","year":2020,"lang":"en","type":"article","venue":"IEEE Open Access Journal of Power and Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Service (business); Business; Transmission (telecommunications); Environmental economics; Computer science; Economics; Marketing; Telecommunications","score_opus":0.021016252107233457,"score_gpt":0.28517359807235537,"score_spread":0.2641573459651219,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3110512617","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021684444,0.0019367861,0.97077173,0.0009559049,0.00064931205,0.00009045838,0.0000035997389,0.000045129793,0.0038626136],"genre_scores_gemma":[0.9953217,0.00086942414,0.0027039275,0.0007227285,0.0001896413,0.000010982327,0.000005475704,0.00004780159,0.0001283095],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989411,0.00004200686,0.00046405877,0.00015714143,0.00019260353,0.00020307362],"domain_scores_gemma":[0.99923104,0.00005840628,0.0001821245,0.000086900174,0.00020676627,0.00023473268],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001993964,0.00017199802,0.00033302157,0.00012341767,0.00007823676,0.00044583826,0.000594237,0.000103676415,0.00004099786],"category_scores_gemma":[0.000018909128,0.00015499827,0.00006114441,0.00034027928,0.000008077954,0.0015040262,0.000050705996,0.00011867013,6.798472e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004771039,0.00004322019,0.000021923788,0.0001561943,0.00017193184,0.00004822494,0.0009995258,0.9431115,0.016099025,0.0009206789,0.01276234,0.025188351],"study_design_scores_gemma":[0.003918013,0.0010620876,0.00013079008,0.00049225596,0.00016004582,0.00035122206,0.00015163636,0.7907071,0.0410351,0.0002696965,0.16105118,0.0006708758],"about_ca_topic_score_codex":0.00010599213,"about_ca_topic_score_gemma":0.000009852294,"teacher_disagreement_score":0.9736373,"about_ca_system_score_codex":0.000055808352,"about_ca_system_score_gemma":0.00007436321,"threshold_uncertainty_score":0.63206464},"labels":[],"label_agreement":null},{"id":"W3113056885","doi":"","title":"An Analysis of the Decline in JEPX Day-Ahead Prices: Some Impacts of RES Supply and the COVID-19-Induced Demand Downturn (Japanese)","year":2020,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Order (exchange); Quarter (Canadian coin); Coronavirus disease 2019 (COVID-19); Economics; Volume (thermodynamics); Database transaction; Monetary economics; Supply and demand; Econometrics; Business; Microeconomics; Geography; Finance","score_opus":0.025002613686728507,"score_gpt":0.30652388271605957,"score_spread":0.28152126902933106,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3113056885","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9951588,0.00089796906,0.00008399489,0.0012001701,0.00014879518,0.0013548944,0.00009879843,0.00003843399,0.0010181519],"genre_scores_gemma":[0.99357563,0.0058854246,0.00016203157,0.00010659512,0.000055847766,0.00009761761,0.00005838395,0.000046732333,0.000011725475],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9967076,0.0007942044,0.0011075657,0.0005633782,0.00035061463,0.00047662196],"domain_scores_gemma":[0.9966296,0.0015150903,0.000336493,0.0012118366,0.00009075879,0.00021621984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004338154,0.00028710612,0.0010337862,0.0009797106,0.000067555215,0.00009095655,0.0010512985,0.0003690245,0.000014770914],"category_scores_gemma":[0.0018810689,0.00021205656,0.00019678235,0.0010531503,0.00025895765,0.00014974228,0.0005969428,0.0010991299,3.1962352e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020504624,0.00005848577,0.030644879,0.00086052425,0.0007151443,0.000006324939,0.006469891,0.95705575,0.0018484428,0.00022167109,0.000015694974,0.0018981353],"study_design_scores_gemma":[0.0017988518,0.000090885034,0.034236155,0.00017300082,0.00020100897,0.0000047426565,0.0010026039,0.9601758,0.0011045459,0.0006542101,0.00019878874,0.00035940425],"about_ca_topic_score_codex":0.0019862426,"about_ca_topic_score_gemma":0.0067457333,"teacher_disagreement_score":0.005467287,"about_ca_system_score_codex":0.000756336,"about_ca_system_score_gemma":0.0005043809,"threshold_uncertainty_score":0.86474156},"labels":[],"label_agreement":null},{"id":"W3114963346","doi":"10.18280/ijsdp.150814","title":"Optimization of Generation Cost, Environmental Impact, and Reliability of a Microgrid Using Non-dominated Sorting Genetic Algorithm-II","year":2020,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sorting; Microgrid; Reliability (semiconductor); Mathematical optimization; Multi-objective optimization; Pareto principle; Genetic algorithm; Computer science; Evolutionary algorithm; Electricity generation; Reliability engineering; Key (lock); Constraint (computer-aided design); Power (physics); Engineering; Algorithm; Mathematics; Artificial intelligence","score_opus":0.008472030917567576,"score_gpt":0.2226293581729283,"score_spread":0.21415732725536074,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3114963346","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6512314,0.0005382938,0.34804413,0.00001042484,0.000063348554,0.00009379456,0.000002690482,0.0000036722215,0.000012236828],"genre_scores_gemma":[0.9014998,0.00009516884,0.098291926,0.0000067103524,0.000068657646,0.0000013256869,0.000019189247,0.000011361548,0.0000058506516],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989598,0.000020731984,0.00059489656,0.000086529195,0.00021680964,0.00012125172],"domain_scores_gemma":[0.9992945,0.000027127679,0.00035045913,0.000027655222,0.00023907302,0.0000611574],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002461778,0.00010428429,0.00019108533,0.00018870746,0.000049672966,0.000026780725,0.00007943397,0.00004782212,0.0000075259877],"category_scores_gemma":[0.000050604438,0.00010357234,0.000026748383,0.0001137234,0.000019649671,0.00027728523,0.00004588301,0.000085826425,4.0269704e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041156796,0.000016385424,0.012316214,0.00006757854,0.00010347832,0.00005122266,0.0041213664,0.9658237,0.012287667,8.4405576e-7,0.000023475366,0.0051468797],"study_design_scores_gemma":[0.00062358554,0.00007413827,0.0052460497,0.00008570581,0.000023733548,0.00007683548,0.0014968695,0.96893674,0.023276743,0.0000030362903,0.000052934207,0.000103646336],"about_ca_topic_score_codex":0.000005378312,"about_ca_topic_score_gemma":5.0066088e-8,"teacher_disagreement_score":0.2502684,"about_ca_system_score_codex":0.00018938722,"about_ca_system_score_gemma":0.000083924955,"threshold_uncertainty_score":0.42235574},"labels":[],"label_agreement":null},{"id":"W3115796903","doi":"10.18280/mmep.070415","title":"Solving Bid-Based Dynamic Economic Dispatch in Competitive Electricity Market Using Improved Simulated Annealing Algorithm","year":2020,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Economic dispatch; Electricity market; Profit maximization; Computer science; Bidding; Electric power system; Electricity; Mathematical optimization; Automatic Generation Control; Profit (economics); Power system simulation; Simulated annealing; Operations research; Economics; Microeconomics; Algorithm; Power (physics); Engineering; Mathematics","score_opus":0.011015173838808968,"score_gpt":0.19307494127631367,"score_spread":0.1820597674375047,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3115796903","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07340114,0.00033741392,0.9252029,0.000030139938,0.000068250505,0.00036035836,0.000008500342,0.000489516,0.00010177215],"genre_scores_gemma":[0.8864142,0.00004238441,0.11338502,0.000011995385,0.000028603692,0.00001428698,0.000009661127,0.000090245485,0.0000036085592],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99851483,0.000023942357,0.0005385074,0.0003259082,0.00010872433,0.00048810366],"domain_scores_gemma":[0.99944097,0.00018794475,0.00005177299,0.00013374753,0.00002455022,0.0001609943],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00026499762,0.00030721084,0.0004464906,0.00017452353,0.00004765383,0.00008884393,0.000117387564,0.000148169,0.000011949717],"category_scores_gemma":[0.00003328012,0.00033979642,0.000054586715,0.00032539037,0.000013536633,0.00014706403,0.000024911364,0.00032974067,0.0000042441447],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004282969,0.000011962096,0.000019190522,0.000717298,0.000027336715,0.0000033804467,0.00028598637,0.9969361,0.0016462264,0.00008100006,0.0000014505617,0.00026578642],"study_design_scores_gemma":[0.00044307116,0.000033388576,0.000004218394,0.00035933306,0.000022222439,0.0000052313767,0.000012845065,0.9981953,0.0003771249,0.00017404913,0.000009140856,0.00036405487],"about_ca_topic_score_codex":0.000028656592,"about_ca_topic_score_gemma":0.0000019623615,"teacher_disagreement_score":0.8130131,"about_ca_system_score_codex":0.00023896933,"about_ca_system_score_gemma":0.000024204168,"threshold_uncertainty_score":0.9999054},"labels":[],"label_agreement":null},{"id":"W3117343138","doi":"10.22094/joie.2020.1892184.1725","title":"A New Optimization Algorithm for Optimal Wind Turbine Location Problem in Constantine City Electric Distribution Network Based Active Power Loss Reduction","year":2021,"lang":"en","type":"article","venue":"Journal of optimization in industrial engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Sizing; Wind power; Reduction (mathematics); Computer science; Turbine; Renewable energy; Algorithm; Particle swarm optimization; Mathematical optimization; Power (physics); Position (finance); Mathematics; Engineering; Electrical engineering","score_opus":0.009860846173016405,"score_gpt":0.20928720293444042,"score_spread":0.199426356761424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3117343138","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002498279,0.0004521407,0.9945655,0.00012735013,0.0014713592,0.0007308292,0.000016773669,0.00009452318,0.00004327377],"genre_scores_gemma":[0.42536184,0.00015478814,0.57287925,0.000009840075,0.0009328746,0.000039043996,0.00048174424,0.000113757415,0.000026837768],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973467,0.00009933858,0.0014066846,0.0002855678,0.00038133402,0.00048040273],"domain_scores_gemma":[0.9982387,0.00016982699,0.000497797,0.00017030083,0.0007753523,0.00014804347],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00078252127,0.00033088576,0.0005595401,0.00063546095,0.000056001772,0.00011055024,0.00015695901,0.00044395612,0.00004815722],"category_scores_gemma":[0.0005370674,0.0003986205,0.000111941954,0.0038564415,0.000011652807,0.00086852734,0.000016581227,0.0006538302,3.746055e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013896832,0.00006814422,0.00010966842,0.000036275513,0.00006555197,0.000016040865,0.000061574654,0.9959116,0.0002654569,0.00005069696,0.00040885995,0.0028671916],"study_design_scores_gemma":[0.004472991,0.00015668324,0.00007386177,0.0004933105,0.000060230497,0.00012692159,0.00003141646,0.99011815,0.003969756,0.000008102634,0.00014899913,0.0003395585],"about_ca_topic_score_codex":0.000012322584,"about_ca_topic_score_gemma":0.0000020175028,"teacher_disagreement_score":0.42286357,"about_ca_system_score_codex":0.0012810075,"about_ca_system_score_gemma":0.0007031507,"threshold_uncertainty_score":0.9998466},"labels":[],"label_agreement":null},{"id":"W3118372329","doi":"10.1109/tpwrs.2021.3049742","title":"Self-Scheduling Models of a CAES Facility Under Uncertainties","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Ontario Centres of Excellence","keywords":"Scheduling (production processes); Compressed air energy storage; Mathematical optimization; Computer science; Monte Carlo method; Hedge; Energy storage; Mathematics; Power (physics)","score_opus":0.01421400205930789,"score_gpt":0.20623876848401948,"score_spread":0.19202476642471158,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3118372329","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013836279,0.0011157241,0.9785172,0.000016483775,0.0023419159,0.0002679052,0.00008376285,0.0005357364,0.003285032],"genre_scores_gemma":[0.99819744,0.00012627846,0.0011982701,0.000008765079,0.000007300446,0.00005790956,0.0000055570376,0.000034507222,0.00036398886],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99850625,0.00010418682,0.00053917145,0.0002598239,0.00031814017,0.0002724008],"domain_scores_gemma":[0.9991042,0.00009335712,0.000065379965,0.0004370258,0.00022073237,0.00007927658],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018805945,0.00021965217,0.0003648384,0.00016844484,0.00007859561,0.000039528564,0.00012193771,0.00016415847,0.000033457432],"category_scores_gemma":[0.0000030702965,0.00023547983,0.00013603059,0.0005138936,0.00002037457,0.0002429937,8.1583255e-7,0.0002069828,0.000025980356],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006462903,0.00007198077,0.0000048684333,0.00032903874,0.00020708468,0.0000039220995,0.0009716742,0.9963432,0.0016787305,0.00028720207,0.00005235314,0.000043499098],"study_design_scores_gemma":[0.00036566384,0.000050790262,0.0000050919857,0.00015053037,0.00006482686,0.00004408674,0.0012162883,0.9665676,0.03079855,0.00004432429,0.00038960116,0.00030268772],"about_ca_topic_score_codex":0.00008074765,"about_ca_topic_score_gemma":0.000030133446,"teacher_disagreement_score":0.9843612,"about_ca_system_score_codex":0.00022657117,"about_ca_system_score_gemma":0.00009496413,"threshold_uncertainty_score":0.9602589},"labels":[],"label_agreement":null},{"id":"W3121215414","doi":"","title":"Valuing Electricity Transmission: The Case of Alberta","year":2012,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Electricity market; Electricity; Incentive; Transmission (telecommunications); Investment (military); Grid; Electric power transmission; Value (mathematics); Business; Economics; Industrial organization; Electricity price; Microeconomics; Computer science; Engineering; Telecommunications; Geography","score_opus":0.00504165806439924,"score_gpt":0.20606614512381957,"score_spread":0.20102448705942033,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121215414","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31419194,0.03619865,0.64225405,0.00023405519,0.00055899326,0.00029167742,6.6702387e-7,0.00010695397,0.0061629964],"genre_scores_gemma":[0.9971592,0.0020586431,0.00016804844,0.0000128095735,0.00024919075,0.0000047843228,8.858645e-7,0.000037928214,0.00030850954],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973928,0.000115624374,0.0003604186,0.000079031866,0.00016427753,0.0018878664],"domain_scores_gemma":[0.99943304,0.0001422499,0.00009514801,0.00017683863,0.000055006807,0.00009769154],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017250101,0.00015565594,0.0001825106,0.000112995236,0.00016541658,0.00002103412,0.00021270856,0.00008332426,0.000029681574],"category_scores_gemma":[0.000045419394,0.000111154375,0.00010898332,0.0004869463,0.00001718721,0.00027577698,0.000008231429,0.0011910787,0.000009832194],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013903664,0.00043223472,0.004436031,0.00027649818,0.0023669933,0.00009957316,0.011552595,0.08779732,0.020023448,0.27814248,0.002540016,0.5921938],"study_design_scores_gemma":[0.006048764,0.0016684798,0.00096396304,0.00037892314,0.0014618259,0.30611002,0.0070374305,0.5273437,0.056735862,0.059498806,0.029579856,0.0031723492],"about_ca_topic_score_codex":0.00015043204,"about_ca_topic_score_gemma":0.00024758957,"teacher_disagreement_score":0.68296725,"about_ca_system_score_codex":0.0005479787,"about_ca_system_score_gemma":0.00028686156,"threshold_uncertainty_score":0.517471},"labels":[],"label_agreement":null},{"id":"W3121448139","doi":"10.2139/ssrn.3477249","title":"Analyzing Firm Behaviour in Restructured Electricity Markets: Empirical Challenges with a Residual Demand Analysis","year":2019,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Bidding; Residual; Microeconomics; Electricity; Economics; Profit (economics); Monotonic function; Econometrics; Demand curve; Procurement; Industrial organization; Empirical research; Common value auction; Computer science; Mathematics","score_opus":0.009567977826831355,"score_gpt":0.24104196367644376,"score_spread":0.2314739858496124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121448139","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79990095,0.07474141,0.12271802,0.00034777765,0.00039909262,0.0007905097,0.000015742658,0.00030773255,0.00077875634],"genre_scores_gemma":[0.966378,0.03235376,0.00057403604,0.000009789195,0.00025731762,0.00003843594,0.00006668738,0.00014586384,0.00017615069],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99336475,0.0005373239,0.0010844548,0.00084238814,0.0007521968,0.0034188824],"domain_scores_gemma":[0.9982026,0.00015663855,0.0004897771,0.0007828066,0.00019671943,0.00017145011],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.003028975,0.0007739458,0.0013665279,0.002425916,0.00011733107,0.00019875044,0.0008085385,0.0008182781,0.00001957561],"category_scores_gemma":[0.00009778402,0.00071209815,0.000336566,0.0020681033,0.000032510055,0.00023257265,0.00013830895,0.008299447,0.0000060355355],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029963724,0.00008834338,0.16746734,0.00020521025,0.0060304035,0.00008291104,0.0005770065,0.822323,0.00002932805,0.00029630627,0.00015775327,0.0024427222],"study_design_scores_gemma":[0.0063684704,0.0014923866,0.51740193,0.0012406207,0.010001839,0.0023533655,0.0013950645,0.43076327,0.00031641292,0.023171915,0.00015851218,0.0053362255],"about_ca_topic_score_codex":0.0001122396,"about_ca_topic_score_gemma":0.0076354956,"teacher_disagreement_score":0.39155978,"about_ca_system_score_codex":0.00469325,"about_ca_system_score_gemma":0.0024609845,"threshold_uncertainty_score":0.999533},"labels":[],"label_agreement":null},{"id":"W3121817115","doi":"","title":"Expansión de las Redes de Transmisión Eléctrica en Norteamérica: Teoría y Aplicaciones","year":2010,"lang":"es","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electric power transmission; Tariff; Transmission network; Electric power system; Grid; Electric power; Network topology; Welfare economics; Topology (electrical circuits); Transmission (telecommunications); Computer science; Telecommunications; Business; Power (physics); Electrical engineering; Economics; Geography; Computer network; Engineering; Physics","score_opus":0.01142106764216577,"score_gpt":0.27309279300552547,"score_spread":0.2616717253633597,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121817115","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6990631,0.001902685,0.00986261,0.0015958811,0.001797439,0.0046358937,0.0002239653,0.0009610989,0.2799573],"genre_scores_gemma":[0.9269323,0.05789953,0.011563515,0.000040688883,0.00078341976,0.0008406746,0.00009681855,0.00036014416,0.0014829185],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99317807,0.0008523306,0.0015074171,0.0015320567,0.00051868474,0.00241146],"domain_scores_gemma":[0.9952057,0.0017390762,0.00027348654,0.0019116707,0.00022178417,0.0006482575],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["research_integrity"],"category_scores_codex":[0.0037372424,0.00084533583,0.0012248115,0.0015264021,0.00029244897,0.0003963582,0.0017435949,0.0021259182,0.00012456262],"category_scores_gemma":[0.0011432649,0.0010272637,0.00039772995,0.0007055904,0.00024758524,0.00025807534,0.00043465837,0.005420652,0.000065888606],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026486552,0.0005251495,0.010446366,0.0020651596,0.0007826014,0.0001897891,0.004762551,0.5312407,0.020389855,0.0020777108,0.00031029954,0.42694494],"study_design_scores_gemma":[0.0028300034,0.00046411937,0.030438429,0.0017051514,0.00017677683,0.00040448442,0.0011922184,0.8215132,0.01197491,0.0022697174,0.1235238,0.0035072141],"about_ca_topic_score_codex":0.000437937,"about_ca_topic_score_gemma":0.00039405192,"teacher_disagreement_score":0.42343774,"about_ca_system_score_codex":0.004197894,"about_ca_system_score_gemma":0.0014573981,"threshold_uncertainty_score":0.9996248},"labels":[],"label_agreement":null},{"id":"W3121913816","doi":"10.1287/opre.2017.1606","title":"Inverse Optimization for the Recovery of Market Structure from Market Outcomes: An Application to the MISO Electricity Market","year":2017,"lang":"en","type":"article","venue":"Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":74,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Wilfrid Laurier University","funders":"","keywords":"Electricity market; Residual; Market power; Commodity; Spot contract; Economics; Market price; Econometrics; Commodity market; Shadow price; Electricity; Derivatives market; Microeconomics; Mathematical optimization; Computer science; Futures contract; Financial economics; Mathematics; Algorithm; Monopoly","score_opus":0.026389042195668316,"score_gpt":0.3199694111104669,"score_spread":0.29358036891479855,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121913816","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018190125,0.00015773434,0.96752995,0.0025062754,0.00037782762,0.004111036,0.0005295441,0.000089758105,0.0065077385],"genre_scores_gemma":[0.9679907,0.0002654276,0.026175248,0.000090328766,0.00024918796,0.0010317675,0.00020386222,0.00007476333,0.003918698],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99819595,0.00032780896,0.00034852803,0.00030547386,0.00047820393,0.00034404866],"domain_scores_gemma":[0.99706525,0.0006945825,0.000053916374,0.0015183435,0.00058207393,0.00008585811],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017808703,0.00016001395,0.00019439775,0.00018401675,0.001258319,0.000476923,0.001050954,0.00013658554,0.00070291717],"category_scores_gemma":[0.0013829978,0.00010918511,0.000059007973,0.0004405038,0.00006460764,0.0004890754,0.00008685221,0.00028283492,0.000008421967],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000084674335,0.000027154223,0.0006378168,0.00002653407,0.00008779822,1.7230012e-7,0.00024371216,0.9163118,0.0010605124,0.00009691776,0.07475253,0.0066703595],"study_design_scores_gemma":[0.00027143824,0.0000616037,0.0077556777,0.000014090469,0.000021363707,8.647621e-7,0.000093525734,0.98685867,0.00080662104,0.00007036866,0.0039237137,0.00012204433],"about_ca_topic_score_codex":0.0008380468,"about_ca_topic_score_gemma":0.0031724821,"teacher_disagreement_score":0.9498006,"about_ca_system_score_codex":0.00019709812,"about_ca_system_score_gemma":0.00012051234,"threshold_uncertainty_score":0.9678099},"labels":[],"label_agreement":null},{"id":"W3122344694","doi":"","title":"Modeling Alberta Power Prices Through Fundamentals","year":2016,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Bidding; Econometrics; Range (aeronautics); Economics; Sensitivity (control systems); Computer science; Model risk; Probability distribution; Microeconomics; Operations research; Risk management; Engineering","score_opus":0.0060179060654339915,"score_gpt":0.2056135626786,"score_spread":0.19959565661316603,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3122344694","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1090715,0.0052805217,0.8756413,0.00033302806,0.00052127143,0.00013852053,0.0000011988292,0.0001651523,0.008847503],"genre_scores_gemma":[0.993268,0.0046495455,0.00044530843,0.000032219443,0.00014849559,0.000007631602,0.0000011301114,0.00006313259,0.0013845417],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99723417,0.00003339883,0.00036283873,0.00016949998,0.00025212375,0.0019479826],"domain_scores_gemma":[0.999577,0.0000528368,0.00006183482,0.00018666101,0.00005429102,0.00006739071],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005422718,0.00019804983,0.00018945751,0.00009861815,0.00011334024,0.00006103722,0.00026293498,0.00009222296,0.00009278217],"category_scores_gemma":[0.000037543,0.00014175285,0.000089253626,0.00020699605,0.000012962223,0.0006624866,0.0000190237,0.0005500177,0.00013480175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016361296,0.00024181811,0.0020861002,0.00007970131,0.0028903903,0.00002140477,0.0038126658,0.46781698,0.042321872,0.41879326,0.0024764668,0.05929571],"study_design_scores_gemma":[0.009424918,0.001843389,0.00010538129,0.0010047145,0.00034911933,0.006084384,0.0037591802,0.50059855,0.010343444,0.43634683,0.026055757,0.0040843105],"about_ca_topic_score_codex":0.000047882575,"about_ca_topic_score_gemma":0.00030818768,"teacher_disagreement_score":0.8841965,"about_ca_system_score_codex":0.0014905719,"about_ca_system_score_gemma":0.00032241983,"threshold_uncertainty_score":0.5780514},"labels":[],"label_agreement":null},{"id":"W3122350098","doi":"10.5547/01956574.41.4.dbro","title":"Imperfect Competition in Electricity Markets with Renewable Generation: The Role of Renewable Compensation Policies","year":2019,"lang":"en","type":"preprint","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Incentive; Renewable energy; Market power; Tariff; Microeconomics; Economics; Industrial organization; Business; International economics","score_opus":0.006776516408414862,"score_gpt":0.18991245364946924,"score_spread":0.18313593724105437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3122350098","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49208885,0.018168034,0.4344952,0.00082384644,0.0024822915,0.0011390984,0.000026590222,0.00026469232,0.050511394],"genre_scores_gemma":[0.9971506,0.00158071,0.000329807,0.000033683093,0.00047239725,0.000030066944,0.000048715534,0.00005011681,0.00030389658],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99807805,0.00044504332,0.000561096,0.00017530033,0.0004207941,0.00031970485],"domain_scores_gemma":[0.99877244,0.00012359486,0.0003934477,0.0004819288,0.00018834186,0.00004026445],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009829662,0.0002709681,0.00038013404,0.00027260944,0.00016200467,0.00014826308,0.00046916583,0.0001865355,0.00003608811],"category_scores_gemma":[0.00002510065,0.00016883647,0.0000875287,0.00046957983,0.00003856744,0.00013427029,0.00007560389,0.00058989454,0.0000016991592],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034867655,0.000016490552,0.0004296664,0.000028051509,0.00009467656,0.0000012889757,0.00030916044,0.9893888,0.007931685,0.0005778073,0.00082120934,0.00036626722],"study_design_scores_gemma":[0.00045177425,0.000086683096,0.00089828804,0.00027358154,0.00006798709,0.00022737801,0.00010582731,0.9499958,0.04447367,0.0013953313,0.0017405521,0.00028309572],"about_ca_topic_score_codex":0.0020961328,"about_ca_topic_score_gemma":0.0015163653,"teacher_disagreement_score":0.50506175,"about_ca_system_score_codex":0.00039510778,"about_ca_system_score_gemma":0.00021849081,"threshold_uncertainty_score":0.68849516},"labels":[],"label_agreement":null},{"id":"W3122435534","doi":"","title":"The Influence of Renewable Energy Sources on the Czech Electricity Transmission System","year":2017,"lang":"en","type":"preprint","venue":"Econstor (Econstor)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"McGill University; Grantová Agentura České Republiky; European Commission; Univerzita Karlova v Praze","keywords":"Renewable energy; Volatility (finance); Wind power; Electricity; Economics; Electric power transmission; Czech; Transmission (telecommunications); Environmental science; Environmental economics; Econometrics; Engineering; Telecommunications; Electrical engineering","score_opus":0.0075097335478316275,"score_gpt":0.19591951026473065,"score_spread":0.188409776716899,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3122435534","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91009146,0.011021739,0.021461261,0.00020132588,0.0029370654,0.0011450065,0.00006978519,0.0008296784,0.052242704],"genre_scores_gemma":[0.9969718,0.0011627651,0.00014164715,0.000025182182,0.00021473196,0.00021391214,0.000012815214,0.00009881136,0.0011583653],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969397,0.0003217894,0.0010223191,0.0005941256,0.00048755723,0.00063449534],"domain_scores_gemma":[0.9960015,0.0008815202,0.0008227432,0.0019390269,0.00020740398,0.00014781083],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011845671,0.0006147402,0.0007957683,0.0002615983,0.00076044427,0.0002477246,0.0017435878,0.00062151754,0.00003089097],"category_scores_gemma":[0.00020106684,0.00042753693,0.000316809,0.00021837822,0.00025256394,0.00015001466,0.00015314424,0.00085399445,0.000027878179],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051060717,0.00004149616,0.010537251,0.00078451063,0.00048277382,0.000010440122,0.00040134275,0.97187346,0.0015484188,0.002676323,0.009961858,0.0016310376],"study_design_scores_gemma":[0.0021707139,0.00056216447,0.01587506,0.010845319,0.0008125005,0.0003566787,0.00045836632,0.7151272,0.14017767,0.0018357778,0.10703354,0.004745],"about_ca_topic_score_codex":0.0010337322,"about_ca_topic_score_gemma":0.0002320345,"teacher_disagreement_score":0.2567463,"about_ca_system_score_codex":0.0007027792,"about_ca_system_score_gemma":0.0004622376,"threshold_uncertainty_score":0.99981767},"labels":[],"label_agreement":null},{"id":"W3122527201","doi":"","title":"Options for Electricity Transmission Regulation in Australia","year":2000,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Electricity; Incentive; Investment (military); Electricity market; Transmission (telecommunications); Industrial organization; Marginal cost; Electric power transmission; Economics; Business; Electricity retailing; Microeconomics; Environmental economics; Telecommunications; Engineering; Electrical engineering","score_opus":0.008299675699609951,"score_gpt":0.23236468138861807,"score_spread":0.2240650056890081,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3122527201","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17345701,0.0022951877,0.8223268,0.00013904534,0.00014087663,0.0004784497,0.0000021488113,0.00016880679,0.0009916817],"genre_scores_gemma":[0.9919853,0.0031814591,0.0012550465,0.0000064265037,0.00013019948,0.000027348722,0.000014716145,0.000036652815,0.0033628033],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99780524,0.000054013475,0.0003665839,0.0001387373,0.00015278514,0.0014826396],"domain_scores_gemma":[0.99972904,0.000030302757,0.000038483653,0.00010042472,0.00004054477,0.00006119526],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00089093146,0.00014554059,0.00016044786,0.00023092017,0.00009590822,0.000036445676,0.00013627406,0.00012267895,0.00013922293],"category_scores_gemma":[0.000010297698,0.00015069461,0.000083128616,0.00051331474,0.0000072033517,0.00026957894,0.0000012657479,0.00077041314,0.00002202172],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014890889,0.00010278158,0.0003733178,0.00004785705,0.00012046757,0.0000018941571,0.00026473615,0.74543935,0.0076481514,0.026253773,0.0007990658,0.21879973],"study_design_scores_gemma":[0.004224476,0.0007414735,0.0036265722,0.0001447132,0.00009921451,0.0007357896,0.000098441786,0.76107377,0.004573289,0.21071197,0.013025781,0.00094448216],"about_ca_topic_score_codex":0.000024184466,"about_ca_topic_score_gemma":0.000157348,"teacher_disagreement_score":0.82107174,"about_ca_system_score_codex":0.0013052245,"about_ca_system_score_gemma":0.0002358338,"threshold_uncertainty_score":0.6145148},"labels":[],"label_agreement":null},{"id":"W3123365842","doi":"","title":"Supply Function Equilibria with Capacity Constraints and Pivotal Suppliers","year":2010,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Bidding; Common value auction; Supply; Market power; Economics; Electricity market; Microeconomics; Function (biology); Electricity","score_opus":0.012554585442664266,"score_gpt":0.2300167134268283,"score_spread":0.21746212798416403,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3123365842","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9417165,0.00009133454,0.00057286414,0.0000441979,0.00073546916,0.0009856374,0.00008904491,0.00019016772,0.055574816],"genre_scores_gemma":[0.99669427,0.0009229468,0.001687866,0.000008578822,0.0001401687,0.00016813823,0.00009820135,0.00010033184,0.00017947554],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978747,0.0000997871,0.00044111806,0.0006570303,0.00022245862,0.00070491794],"domain_scores_gemma":[0.99880195,0.00019329594,0.000081889615,0.00062460627,0.00008305994,0.00021521359],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.00090977224,0.00034111753,0.00045030523,0.00047699205,0.00008466202,0.00018709252,0.0002838812,0.0006427999,0.00009582308],"category_scores_gemma":[0.00009259843,0.0003713379,0.00005376367,0.00013582793,0.00044592324,0.00015831002,0.00022665587,0.0023141264,0.000006341239],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006386095,0.00022400057,0.052583147,0.002669417,0.0011632906,0.0001117232,0.002093531,0.5309909,0.016608493,0.0027523912,0.0005062038,0.38965833],"study_design_scores_gemma":[0.0034247017,0.0005414638,0.025090335,0.00077010965,0.00007747055,0.00030788314,0.00065241463,0.956165,0.0022548642,0.0017353283,0.0066360785,0.002344311],"about_ca_topic_score_codex":0.00004484402,"about_ca_topic_score_gemma":0.00037819913,"teacher_disagreement_score":0.42517418,"about_ca_system_score_codex":0.000629965,"about_ca_system_score_gemma":0.00026413423,"threshold_uncertainty_score":0.9999876},"labels":[],"label_agreement":null},{"id":"W3123454487","doi":"","title":"Nodal Pricing and Transmissions Losses. An Application to a Hydroelectric Power System","year":2000,"lang":"en","type":"article","venue":"Cahiers de recherche","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydroelectricity; Electricity; Electricity market; Electric power transmission; Economics; Econometrics; Consumption (sociology); Quadratic equation; Hydropower; Order (exchange); Microeconomics; Telecommunications; Electrical engineering; Computer science; Mathematics; Engineering; Finance","score_opus":0.019662653590675153,"score_gpt":0.26725489768113403,"score_spread":0.24759224409045888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3123454487","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26258764,0.0006264061,0.7121937,0.00006485772,0.000039869643,0.00049307087,0.0000022295292,0.0006557904,0.0233364],"genre_scores_gemma":[0.9838927,0.00011681449,0.015160859,0.00007205128,0.000037444923,0.00008884616,0.0000069438447,0.000056595018,0.0005677843],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99886686,0.0002470237,0.00020752761,0.0002392769,0.00011305083,0.0003262742],"domain_scores_gemma":[0.999309,0.00013194047,0.00001769777,0.00025022335,0.000030068708,0.000261067],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085261837,0.00015475214,0.00016857022,0.000159488,0.00008336486,0.000044174325,0.00013556158,0.0004308453,0.000023620249],"category_scores_gemma":[0.00005761734,0.00016376344,0.000028595887,0.00093677524,0.000016062411,0.00013371944,0.000002686904,0.00049133063,0.000036920257],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007941212,0.00009561519,0.00022384977,0.0006219613,0.0001375123,0.000024343037,0.017542293,0.24645972,0.111993544,0.0021372938,0.0009259587,0.6197585],"study_design_scores_gemma":[0.0005123268,0.000177371,0.0004215089,0.00014333705,0.000065882305,0.00022719719,0.00034478167,0.97751206,0.012351121,0.0001611992,0.007502078,0.00058112957],"about_ca_topic_score_codex":0.00001829429,"about_ca_topic_score_gemma":0.0000032559954,"teacher_disagreement_score":0.73105234,"about_ca_system_score_codex":0.0012510063,"about_ca_system_score_gemma":0.000053494063,"threshold_uncertainty_score":0.66780794},"labels":[],"label_agreement":null},{"id":"W3123467622","doi":"","title":"Motivating the Optimal Procurement and Deployment of Electric Storage as a Transmission Asset","year":2019,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund; Government of Canada","keywords":"Procurement; Electric utility; Asset (computer security); Software deployment; Service (business); Business; Transmission (telecommunications); Electricity; Industrial organization; Environmental economics; Mains electricity; Microeconomics; Commerce; Economics; Computer science; Engineering; Computer security; Marketing; Telecommunications","score_opus":0.015170230381379943,"score_gpt":0.2650676472792144,"score_spread":0.24989741689783446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3123467622","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9644217,0.0028888625,0.0048951586,0.00019439262,0.000316791,0.0038023493,0.000016742853,0.00014467395,0.023319315],"genre_scores_gemma":[0.99056005,0.0076506883,0.0011938204,0.000009575332,0.00004425985,0.00022159751,0.00001881423,0.000079768106,0.00022139368],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99789983,0.0002046791,0.0006008627,0.00046344483,0.00032048867,0.00051071635],"domain_scores_gemma":[0.9988177,0.00032681637,0.00013692911,0.0005415418,0.00007488052,0.00010215663],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017508619,0.00025669736,0.0004083851,0.00041230497,0.00007059071,0.000077377495,0.00040568225,0.00027054365,0.000018853283],"category_scores_gemma":[0.00016925247,0.00022789107,0.00007318839,0.00021670817,0.00004111619,0.00007123503,0.00022308665,0.001128497,0.000002132891],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030906453,0.000040220406,0.0009268933,0.00074339466,0.00010544258,0.0000037324303,0.0007140414,0.9342475,0.002025389,0.000044543533,0.000051165458,0.06106675],"study_design_scores_gemma":[0.0004986533,0.00016293809,0.0011623929,0.00042548447,0.000014574997,0.000012335057,0.00018591467,0.9911392,0.0039066738,0.00007489318,0.0021136126,0.00030335793],"about_ca_topic_score_codex":0.000040299405,"about_ca_topic_score_gemma":0.000006510184,"teacher_disagreement_score":0.060763393,"about_ca_system_score_codex":0.0009852594,"about_ca_system_score_gemma":0.00035016378,"threshold_uncertainty_score":0.92931277},"labels":[],"label_agreement":null},{"id":"W3124039149","doi":"","title":"An Economic and Stakeholder Analysis for the Design of IPP Contracts for Wind Farms","year":2016,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of California, Los Angeles; Loughborough University; Imperial College London; Queen's University; University of Warwick; George Washington University","keywords":"Cape verde; Stakeholder; Business; Investment (military); Government (linguistics); Net present value; Yield (engineering); Wind power; Finance; Rate of return; Private sector; Economics; Economy; Microeconomics; Engineering; Economic growth","score_opus":0.054047453645220234,"score_gpt":0.2984295675155804,"score_spread":0.24438211387036018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124039149","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2805684,0.002806116,0.6923142,0.000362466,0.0014352117,0.015426093,0.001800109,0.0002149715,0.00507243],"genre_scores_gemma":[0.9915935,0.004467941,0.0029013287,0.0000070916954,0.00013877427,0.0006092688,0.000056512574,0.000086407774,0.00013918018],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981286,0.00012241463,0.000632152,0.0005135679,0.00008593616,0.0005173644],"domain_scores_gemma":[0.9966282,0.0022088445,0.0001728159,0.00078448904,0.00010391552,0.000101683414],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024468447,0.00024125329,0.00061332114,0.00055240456,0.00008071934,0.00011295981,0.00047627205,0.00031736807,0.000012458645],"category_scores_gemma":[0.00017745073,0.00020013306,0.000151347,0.000088215515,0.00010661623,0.00012599993,0.00008379391,0.00030578108,5.323715e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008819219,0.00001713555,0.0012685792,0.00015057973,0.0009086512,3.468113e-7,0.00016679792,0.96836466,0.00026019776,0.00013123568,0.000030142623,0.028613491],"study_design_scores_gemma":[0.0008050111,0.000108016946,0.0016617704,0.000054942164,0.00012902968,0.0000012284665,0.00011993502,0.99450773,0.00066854636,0.00064419623,0.001031538,0.0002680422],"about_ca_topic_score_codex":0.000016846598,"about_ca_topic_score_gemma":0.00011048175,"teacher_disagreement_score":0.7110251,"about_ca_system_score_codex":0.0006417799,"about_ca_system_score_gemma":0.0002329323,"threshold_uncertainty_score":0.81611896},"labels":[],"label_agreement":null},{"id":"W3124215582","doi":"10.1016/j.eneco.2016.03.013","title":"Measuring demand responses to wholesale electricity prices using market power indices","year":2016,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"Social Sciences and Humanities Research Council of Canada","keywords":"Economics; Price elasticity of demand; Lerner index; Market power; Cournot competition; Econometrics; Natural gas prices; Index (typography); Price index; Electricity market; Demand curve; Electricity; Agricultural economics; Microeconomics","score_opus":0.01287710347201598,"score_gpt":0.18498530074111247,"score_spread":0.17210819726909649,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124215582","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83359355,0.0004524856,0.15885888,0.000041886793,0.00036711164,0.000076235665,0.000008079282,0.0002085084,0.0063932533],"genre_scores_gemma":[0.9964458,0.0002131063,0.0024810096,0.000050054154,0.00009606964,0.000014156503,0.0000011057729,0.000057971556,0.00064077607],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99899477,0.00004446539,0.00030203798,0.00024422517,0.00006482704,0.00034969943],"domain_scores_gemma":[0.99940014,0.00013290672,0.0000760371,0.0002448828,0.00003175219,0.00011428201],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031384526,0.0001779772,0.00020869965,0.00031066415,0.00006882292,0.00006597097,0.00020105777,0.00009954704,0.000051631854],"category_scores_gemma":[0.000064518594,0.00016322138,0.000042949145,0.00021002947,0.000011546623,0.0003426843,0.00003714435,0.00004632525,0.000013249215],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008103177,0.00017279043,0.13324505,0.00020739499,0.0012116744,0.00004259613,0.0015638446,0.6902355,0.112792544,0.0050451127,0.010563288,0.044109907],"study_design_scores_gemma":[0.0021046412,0.00027111563,0.014669951,0.00042757354,0.00009206232,0.00012766621,0.000079935475,0.5297054,0.3212969,0.0007246998,0.1278809,0.0026191669],"about_ca_topic_score_codex":0.000026702444,"about_ca_topic_score_gemma":0.000066598746,"teacher_disagreement_score":0.20850436,"about_ca_system_score_codex":0.0004090196,"about_ca_system_score_gemma":0.000042081952,"threshold_uncertainty_score":0.6655975},"labels":[],"label_agreement":null},{"id":"W3124723900","doi":"10.1016/j.jup.2014.05.003","title":"The EU internal electricity market: Done forever?","year":2014,"lang":"en","type":"article","venue":"Utilities Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity market; Quarter (Canadian coin); Decentralization; Domestic market; Consumption (sociology); Market economy; Renewable energy; Economics; Business; Industrial organization; International trade; Engineering","score_opus":0.003202275714546914,"score_gpt":0.1913101816904742,"score_spread":0.18810790597592728,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124723900","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029406201,0.0013047896,0.1050382,0.0011081188,0.000968458,0.00039124815,0.000014378845,0.0009902072,0.8607784],"genre_scores_gemma":[0.98830765,0.00014986035,0.00013685015,0.00016268983,0.000546152,0.000023837061,0.0000024257904,0.000032691747,0.01063781],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99901366,0.000073021234,0.00022762266,0.000111303925,0.00015565401,0.00041875977],"domain_scores_gemma":[0.9993376,0.00023535616,0.000033460263,0.00029358678,0.000037069825,0.00006292728],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032144354,0.00013952752,0.0001322076,0.00011805658,0.0001226495,0.0000772176,0.00026729683,0.00006145457,0.00004549317],"category_scores_gemma":[0.00025055834,0.00010986568,0.000056714325,0.0003026667,0.000039765448,0.0000967765,0.000029923305,0.00014323676,0.000045890523],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012414194,0.0000506675,0.001817979,0.00038856047,0.00037688733,0.0000036164195,0.0025300907,0.0067625376,0.0009272162,0.289444,0.49356657,0.20400774],"study_design_scores_gemma":[0.00041704025,0.00008434619,0.0027283677,0.000035986086,0.000014024976,0.000029940617,0.000066965935,0.41369343,0.003212086,0.0040559773,0.5753356,0.00032620798],"about_ca_topic_score_codex":0.00034686216,"about_ca_topic_score_gemma":0.00008543972,"teacher_disagreement_score":0.95890146,"about_ca_system_score_codex":0.00019142056,"about_ca_system_score_gemma":0.000031916512,"threshold_uncertainty_score":0.44801924},"labels":[],"label_agreement":null},{"id":"W3124817670","doi":"","title":"Investment in Electricity Markets with Asymmetric Technologies","year":2009,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Guelph","funders":"","keywords":"Markov perfect equilibrium; Investment (military); Electricity; Economics; Generator (circuit theory); Competition (biology); Markov chain; Microeconomics; Competitive equilibrium; Nash equilibrium; Computer science; Engineering; Thermodynamics; Physics; Power (physics)","score_opus":0.01192476405860325,"score_gpt":0.24561362714672794,"score_spread":0.2336888630881247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124817670","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41195878,0.0052918517,0.00075399596,0.00033975858,0.0004647086,0.0042533795,0.0000251872,0.0015858526,0.5753265],"genre_scores_gemma":[0.97104514,0.02316075,0.0049199094,0.00002403224,0.000037438273,0.00045264664,0.000034471374,0.00009869297,0.00022692268],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99712336,0.00019088198,0.00065143884,0.0007346235,0.0003031258,0.0009965545],"domain_scores_gemma":[0.9985331,0.00027567285,0.00010607293,0.00092989684,0.00007138194,0.00008383994],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0015518576,0.00039106904,0.0006112811,0.0031888895,0.000045072084,0.000117468146,0.00074491114,0.0006822668,0.0000055726064],"category_scores_gemma":[0.00040027557,0.0004123932,0.000063572996,0.0014627508,0.00008568925,0.000113289876,0.00029628552,0.0023318543,0.000005625536],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007583789,0.0001454118,0.007250085,0.0003485971,0.00010531592,0.000103768034,0.00010338375,0.55379313,0.00005274443,0.00035176342,0.00010749949,0.43756247],"study_design_scores_gemma":[0.0022838372,0.00053785526,0.03660654,0.0012950442,0.000022260505,0.000055916415,0.00033998853,0.9419981,0.0039490727,0.00515135,0.00565368,0.0021063085],"about_ca_topic_score_codex":0.00003995299,"about_ca_topic_score_gemma":0.00024774464,"teacher_disagreement_score":0.5750996,"about_ca_system_score_codex":0.0038836193,"about_ca_system_score_gemma":0.0003426137,"threshold_uncertainty_score":0.9999698},"labels":[],"label_agreement":null},{"id":"W3124842095","doi":"","title":"Local Labor Market Impacts of Energy Boom-Bust-Boom in Western Canada","year":2011,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"University of Alberta","keywords":"Boom; Bust; Earnings; Labour economics; Economics; Price shock; Business; Monetary economics; Engineering; Finance","score_opus":0.010606386770465171,"score_gpt":0.23296133171910904,"score_spread":0.22235494494864388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124842095","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7007222,0.0030479839,0.0012956234,0.00014065363,0.002370907,0.0017016897,0.00038684398,0.00020259617,0.2901315],"genre_scores_gemma":[0.9909304,0.0070885946,0.00021238127,0.000023119697,0.00007037316,0.000119696415,0.00005341811,0.0001153274,0.00138673],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997158,0.00024939497,0.000903735,0.0005360582,0.00028081363,0.00087198685],"domain_scores_gemma":[0.9983764,0.00027200492,0.00014976811,0.00088149274,0.00010774066,0.00021258896],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010763588,0.0003407044,0.00068666163,0.00068970036,0.000024377787,0.00004051428,0.00067555805,0.00048542023,0.00009368611],"category_scores_gemma":[0.0001601871,0.0004130464,0.0000711326,0.0002630665,0.00008311991,0.00009990725,0.00038243516,0.0010803579,0.0000014385006],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001650981,0.0001055903,0.050299425,0.0014075863,0.00026769348,0.00017683055,0.0005051035,0.88378817,0.00011057945,0.0001471922,0.001414378,0.061612353],"study_design_scores_gemma":[0.0027287626,0.00023103938,0.07224517,0.0026429144,0.00003219571,0.000054071443,0.0006165456,0.8765026,0.0063368888,0.00050093664,0.035639543,0.0024693422],"about_ca_topic_score_codex":0.20566577,"about_ca_topic_score_gemma":0.7608748,"teacher_disagreement_score":0.55520904,"about_ca_system_score_codex":0.0035724635,"about_ca_system_score_gemma":0.0018527587,"threshold_uncertainty_score":0.99983215},"labels":[],"label_agreement":null},{"id":"W3125140514","doi":"","title":"Power Trade, Welfare, and Air Quality","year":2014,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Autarky; Economics; Welfare; Volatility (finance); Electricity; Electricity market; Market power; Air quality index; Electricity price; International economics; Monetary economics; Agricultural economics; Microeconomics; Econometrics; Market economy; Engineering","score_opus":0.017162040589624714,"score_gpt":0.2835752862813007,"score_spread":0.26641324569167596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125140514","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5496049,0.0012792352,0.0006741694,0.0008819769,0.0017007398,0.0017899092,0.000088612906,0.0005790125,0.44340143],"genre_scores_gemma":[0.99519545,0.0035980053,0.0005381161,0.000028952296,0.00009543885,0.00012945369,0.000039407943,0.00009881386,0.0002763876],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99751425,0.00028905756,0.0006828297,0.0006385324,0.00022643477,0.0006489007],"domain_scores_gemma":[0.9985545,0.0002747322,0.000090295056,0.00085993536,0.000039947103,0.00018057621],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0020953831,0.00030800022,0.0005656158,0.00044852335,0.000082415005,0.000098274315,0.00041446046,0.0005543877,0.00005237319],"category_scores_gemma":[0.00024230439,0.00036423485,0.00008965674,0.00012511731,0.000100574944,0.00008753742,0.00032878015,0.0014192449,0.000006528473],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006481519,0.00010714594,0.00814234,0.0018829583,0.0003212566,0.000024493467,0.0010009083,0.81395316,0.00016780778,0.0026886421,0.0005442618,0.17110224],"study_design_scores_gemma":[0.0026271308,0.00026162434,0.13689551,0.0007908963,0.000028388782,0.00006087836,0.00074619113,0.694719,0.00064805703,0.0017984564,0.15826176,0.0031621002],"about_ca_topic_score_codex":0.00003467772,"about_ca_topic_score_gemma":0.00007251622,"teacher_disagreement_score":0.4455905,"about_ca_system_score_codex":0.0007783294,"about_ca_system_score_gemma":0.00009495415,"threshold_uncertainty_score":0.99988097},"labels":[],"label_agreement":null},{"id":"W3125484123","doi":"10.15173/esr.v17i1.518","title":"Modelling Spot Prices in Deregulated Wholesale Electricity Markets: A Selected Empirical Review","year":2011,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity; Restructuring; Deregulation; Volatility (finance); Electricity market; Spot contract; Economics; Industrial organization; Electricity retailing; Business; Financial economics; Microeconomics; Macroeconomics; Finance; Futures contract","score_opus":0.05216892007799506,"score_gpt":0.26937096762240287,"score_spread":0.2172020475444078,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125484123","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005543637,0.9663693,0.02745826,0.000114626535,0.000121529905,0.00047551573,0.0000011480821,0.00037104613,0.0045342282],"genre_scores_gemma":[0.025366653,0.97099847,0.0025784483,0.00059562665,0.00003150476,0.00023598531,0.000015761514,0.000057847094,0.00011967992],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99780405,0.00016668318,0.000910057,0.00037403876,0.00024734638,0.0004978114],"domain_scores_gemma":[0.99908644,0.000088898116,0.00014939082,0.00035759833,0.00024149724,0.00007617267],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005876665,0.00035952413,0.0010617715,0.00016137108,0.000059673854,0.000008231417,0.0002508635,0.00009250073,0.00007003541],"category_scores_gemma":[0.00018427114,0.00031723696,0.00010748292,0.002975124,0.000024677187,0.00016789764,0.000049738337,0.00020910121,0.000018694165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012174308,0.00096907903,0.0025987364,0.28938395,0.004859254,0.00038434353,0.0026648701,0.12620977,0.00011190176,0.0016722146,0.34404448,0.22697969],"study_design_scores_gemma":[0.0015371629,0.0002625003,0.0015830583,0.16984744,0.001423859,0.00020996774,0.000046556608,0.52195835,0.0014667709,0.00036855674,0.2979104,0.0033853408],"about_ca_topic_score_codex":0.00003902056,"about_ca_topic_score_gemma":0.000043298456,"teacher_disagreement_score":0.39574862,"about_ca_system_score_codex":0.0002713123,"about_ca_system_score_gemma":0.00004273214,"threshold_uncertainty_score":0.999928},"labels":[],"label_agreement":null},{"id":"W3125844522","doi":"","title":"Electricity prices and cost factors","year":2001,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Quality (philosophy); Range (aeronautics); Electricity price; Economics; Business; Service (business); Agricultural economics; Environmental economics; Natural resource economics; Economy; Engineering","score_opus":0.0221385387093278,"score_gpt":0.2743864056165667,"score_spread":0.2522478669072389,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125844522","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8175374,0.0013762685,0.00061073416,0.00004079638,0.0006313756,0.001658865,0.00003644709,0.00033052472,0.17777753],"genre_scores_gemma":[0.9637412,0.034786697,0.00042248736,0.0000075160783,0.00011808773,0.00016367376,0.00006775899,0.000098784425,0.0005938303],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978935,0.00010219321,0.00048431504,0.00057281327,0.00019565146,0.0007515305],"domain_scores_gemma":[0.99880135,0.0003409394,0.000082397855,0.0005398414,0.00006575334,0.00016974422],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008034448,0.00031097283,0.0004625474,0.00069935556,0.000081508995,0.00017529096,0.0003981165,0.00048124205,0.000026819875],"category_scores_gemma":[0.00021207216,0.0003514406,0.00006427319,0.00028223096,0.000070808484,0.00011792517,0.0002922552,0.0014611633,0.00000458531],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038886876,0.00010778493,0.06153172,0.0008589855,0.00029851234,0.00004534024,0.00089652685,0.6719687,0.00028205762,0.00022480883,0.00032643898,0.26342022],"study_design_scores_gemma":[0.0009152575,0.00012138229,0.025981618,0.00034557452,0.000023454715,0.000035153425,0.00027861045,0.93459266,0.0013170899,0.00068864337,0.03425844,0.0014421246],"about_ca_topic_score_codex":0.00008874821,"about_ca_topic_score_gemma":0.00017946947,"teacher_disagreement_score":0.26262394,"about_ca_system_score_codex":0.0013340071,"about_ca_system_score_gemma":0.00016022942,"threshold_uncertainty_score":0.9998938},"labels":[],"label_agreement":null},{"id":"W3125976394","doi":"10.18280/isi.250602","title":"Simulated Annealing Algorithm for Dynamic Economic Dispatch Problem in the Electricity Market Incorporating Wind Energy","year":2020,"lang":"en","type":"article","venue":"Ingénierie des systèmes d information","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Economic dispatch; Bidding; Electricity market; Market clearing; Mathematical optimization; Computer science; Wind power; Simulated annealing; Electric power system; Profit (economics); Bilevel optimization; Electricity; Optimization problem; Economics; Engineering; Microeconomics; Power (physics); Algorithm; Mathematics","score_opus":0.0061748806360793305,"score_gpt":0.1943887107610289,"score_spread":0.18821383012494958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125976394","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033820484,0.00015642146,0.9616389,0.00007114273,0.0001575609,0.000859174,0.00004755783,0.0003429499,0.002905792],"genre_scores_gemma":[0.9893522,0.00002657777,0.010019193,0.00014925492,0.000061642124,0.00007745271,0.0002773158,0.000030360994,0.0000059761637],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985364,0.00007556397,0.00077530346,0.00013285158,0.000141972,0.00033788072],"domain_scores_gemma":[0.99933743,0.00015355919,0.00023149938,0.00014356451,0.00007909487,0.000054848133],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005052532,0.00021308113,0.0002422145,0.00018828295,0.00013911258,0.00022049053,0.00024099497,0.0001327646,0.000006563549],"category_scores_gemma":[0.000079842495,0.00019944728,0.000056715955,0.0006251269,0.000020071093,0.0015905115,0.000020012973,0.0001474427,0.000009605453],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017001703,0.0000051256825,0.00033944473,0.00025760528,0.0000328069,0.0000010088656,0.0030674387,0.9046156,0.000064566266,0.0002165298,0.0005447772,0.09083811],"study_design_scores_gemma":[0.00045524482,0.00007438135,0.0002591107,0.00006506635,0.000011867448,0.000009084263,0.00023007477,0.9974345,0.00023077962,0.00046763095,0.0005398116,0.00022245108],"about_ca_topic_score_codex":0.00009204502,"about_ca_topic_score_gemma":0.000036781825,"teacher_disagreement_score":0.9555317,"about_ca_system_score_codex":0.00057325274,"about_ca_system_score_gemma":0.00006389393,"threshold_uncertainty_score":0.8133224},"labels":[],"label_agreement":null},{"id":"W3126085421","doi":"10.2139/ssrn.3198117","title":"Strategic Use of Storage: The Impact of Carbon Policy, Resource Availability, and Technology Efficiency on a Renewable-Thermal Power System","year":2018,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Carbon capture and storage (timeline); Environmental economics; Renewable energy; Incentive; Business; Carbon tax; Thermal energy storage; Industrial organization; Energy storage; Renewable resource; Profit (economics); Marginal value; Natural resource economics; Economics; Greenhouse gas; Microeconomics; Climate change; Power (physics); Engineering","score_opus":0.007470031320176298,"score_gpt":0.2212708062700971,"score_spread":0.2138007749499208,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3126085421","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99414164,0.0012867582,0.001505093,0.00005440679,0.000067647685,0.00021722514,0.000003457521,0.00008472145,0.0026390604],"genre_scores_gemma":[0.9996696,0.000098832774,0.000019623241,0.0000018491962,0.0000883822,0.0000032102587,5.445857e-7,0.000035907728,0.0000820116],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979138,0.00014485513,0.00044556675,0.0001617475,0.00023966604,0.0010944117],"domain_scores_gemma":[0.999081,0.0000815285,0.00022836345,0.0003817417,0.00017568229,0.00005164568],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011406555,0.00019411696,0.00029421202,0.00045531528,0.000087164844,0.000030838597,0.0002828885,0.00015614623,0.0000037849934],"category_scores_gemma":[0.00008679967,0.00013382733,0.00007431268,0.0009831974,0.00016087625,0.00007804509,0.000030802803,0.0007624016,0.0000012720892],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006280952,0.0003573169,0.0125017725,0.000312794,0.0016063013,0.000012600658,0.0022765722,0.7818666,0.12727505,0.07066834,0.00021111309,0.0022834],"study_design_scores_gemma":[0.006933471,0.032267164,0.0063242433,0.001545433,0.0004770846,0.0070998683,0.009867937,0.8782565,0.03821136,0.01651913,0.00023873859,0.002259047],"about_ca_topic_score_codex":0.0006141091,"about_ca_topic_score_gemma":0.00014781913,"teacher_disagreement_score":0.09638988,"about_ca_system_score_codex":0.0013333694,"about_ca_system_score_gemma":0.001024175,"threshold_uncertainty_score":0.545732},"labels":[],"label_agreement":null},{"id":"W3126405872","doi":"10.1109/epec48502.2020.9320108","title":"Scenario Selection for Generation Expansion Planning with Demand and Wind Uncertainty","year":2020,"lang":"en","type":"article","venue":"2020 IEEE Electric Power and Energy Conference (EPEC)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Cluster analysis; Selection (genetic algorithm); k-means clustering; Computer science; Reliability (semiconductor); Wind power; Investment (military); Duration (music); Capacity planning; Engineering; Artificial intelligence; Power (physics)","score_opus":0.014228665060730002,"score_gpt":0.19998050249737756,"score_spread":0.18575183743664755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3126405872","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27252105,0.0014743024,0.72437423,0.00020368712,0.00019606526,0.0002146275,0.0000043264863,0.00027319102,0.00073851855],"genre_scores_gemma":[0.9981563,0.00036790463,0.0008428183,0.0001786343,0.00022481669,0.000040870655,0.00003966582,0.000044138196,0.00010486551],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99873644,0.000041686228,0.0002561918,0.0004195843,0.00017532211,0.00037076874],"domain_scores_gemma":[0.99947894,0.000053530835,0.00006561163,0.00009209022,0.00012253829,0.00018730974],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001023339,0.0002740897,0.00028950043,0.00010695486,0.00017900829,0.00013784143,0.00007762625,0.00015084771,0.000012228767],"category_scores_gemma":[0.00002603923,0.00025452246,0.000027253347,0.00049287244,0.000017019664,0.00026216326,0.000009897749,0.00015813237,9.942772e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004010962,0.000044563283,0.0017870405,0.00021814597,0.00030235524,0.000015798114,0.0029437523,0.70868444,0.25321138,0.0019605455,0.009047228,0.021383677],"study_design_scores_gemma":[0.00081174413,0.0006243692,0.00024067349,0.00003875737,0.000052609306,0.000044329252,0.000040892017,0.98005915,0.01575008,0.000044082113,0.001925924,0.00036738263],"about_ca_topic_score_codex":0.000045106364,"about_ca_topic_score_gemma":0.000053418273,"teacher_disagreement_score":0.72563523,"about_ca_system_score_codex":0.00006896083,"about_ca_system_score_gemma":0.000098583936,"threshold_uncertainty_score":0.9999907},"labels":[],"label_agreement":null},{"id":"W3130884250","doi":"","title":"Managing Hydro Capacity, Transmission and Competition: Lessons from British Columbia","year":2007,"lang":"en","type":"article","venue":"Energy Markets and Sustainability in a Larger Europe,9th IAEE European Conference,June 10-31, 2007","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Competition (biology); Business; Geography; Ecology","score_opus":0.006994465130633126,"score_gpt":0.19811983341904033,"score_spread":0.1911253682884072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3130884250","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44269133,0.004588249,0.24607293,0.001400366,0.0012574632,0.0010119695,0.000121692974,0.0010183696,0.30183762],"genre_scores_gemma":[0.9825532,0.0016866298,0.00082247827,0.00016302842,0.00016928611,0.000011830088,0.000115493436,0.000120627294,0.014357438],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9963016,0.0006573861,0.0009001507,0.0008640869,0.00035818468,0.00091859885],"domain_scores_gemma":[0.99836487,0.0002351916,0.00012009854,0.0004893823,0.00040103495,0.000389441],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0023486875,0.00041274138,0.00056246994,0.00024794586,0.0003024688,0.0007408348,0.00032521892,0.00015178438,0.00053238403],"category_scores_gemma":[0.00018123214,0.00057335495,0.000072801675,0.0007561953,0.00023869783,0.00038920323,0.0001685692,0.00044230244,0.000008069903],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00089126657,0.0016591592,0.0651235,0.0037009548,0.00068718835,0.009543287,0.00634719,0.010305646,0.0014132912,0.014971194,0.17745645,0.7079009],"study_design_scores_gemma":[0.0023675703,0.00011632012,0.08869863,0.00050459156,0.00006796633,0.000147407,0.000512282,0.052292246,0.000059128197,0.0023107573,0.8515421,0.0013809924],"about_ca_topic_score_codex":0.002514729,"about_ca_topic_score_gemma":0.0053602993,"teacher_disagreement_score":0.7065199,"about_ca_system_score_codex":0.00024597047,"about_ca_system_score_gemma":0.00011174614,"threshold_uncertainty_score":0.9996718},"labels":[],"label_agreement":null},{"id":"W3133733761","doi":"10.1109/icjece.2020.3039249","title":"Bacterial Foraging Algorithm &amp; Demand Response Programs for a Probabilistic Transmission Expansion Planning With the Consideration of Uncertainties and Voltage Stability Index","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universiti Kuala Lumpur","keywords":"Mathematical optimization; Demand response; Computer science; Electric power system; Probabilistic logic; Stability (learning theory); Closeness; Power (physics); Reliability engineering; Electricity; Engineering; Mathematics","score_opus":0.009931773543117117,"score_gpt":0.18830233180218098,"score_spread":0.17837055825906387,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3133733761","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36656877,0.001011246,0.63217175,0.00004432059,0.00005957552,0.00013215293,0.0000014336919,0.000009925331,8.135957e-7],"genre_scores_gemma":[0.9837992,0.0000111896115,0.01609541,0.0000061115225,0.00005859914,0.0000073080746,0.000004233228,0.000015436262,0.0000024748338],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99930257,0.000041512958,0.00026388874,0.00010125006,0.0000907886,0.00020000924],"domain_scores_gemma":[0.999257,0.00029044642,0.000055490113,0.00006346171,0.00017260661,0.00016099015],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003227022,0.00011537707,0.00021203863,0.000120646546,0.00007261979,0.000090188005,0.000046324265,0.000054096807,0.0000012853098],"category_scores_gemma":[0.00006339533,0.000086315194,0.00002975819,0.00021369764,0.000024293027,0.00011099192,0.0000041830913,0.00014457497,1.0198472e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004176939,0.000030459727,0.0022736038,0.0006918408,0.0002328936,0.00008520401,0.004596467,0.85572165,0.01902193,0.00012846728,0.00021269558,0.11658711],"study_design_scores_gemma":[0.00057428435,0.00027390366,0.0016605823,0.00024054936,0.000034096047,0.00031148965,0.000029409617,0.9939006,0.0018793598,0.000046851797,0.00091902347,0.0001298604],"about_ca_topic_score_codex":0.000027084221,"about_ca_topic_score_gemma":0.000074200354,"teacher_disagreement_score":0.6172305,"about_ca_system_score_codex":0.00007563695,"about_ca_system_score_gemma":0.00024065432,"threshold_uncertainty_score":0.35198316},"labels":[],"label_agreement":null},{"id":"W3136221107","doi":"10.2316/journal.203.2015.3.203-6113","title":"OPTIMAL COOPERATIVE DEMAND RESPONSE SCENARIO FOR SYSTEM CONGESTION","year":2015,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Economics; Computer science","score_opus":0.01001062135740102,"score_gpt":0.22701651710335338,"score_spread":0.21700589574595236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3136221107","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09892036,0.0043789484,0.8848665,0.00013931516,0.009743267,0.00012259437,0.000026592257,0.00008831119,0.0017141126],"genre_scores_gemma":[0.9986109,0.00003886173,0.0006215003,0.000012353111,0.0003554017,0.000013252237,0.000006513597,0.00002361501,0.00031759898],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988103,0.00011775245,0.0005055402,0.000093218274,0.00034261667,0.0001305549],"domain_scores_gemma":[0.9983866,0.0001335554,0.00017893242,0.00006665285,0.0010932735,0.00014093846],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008934581,0.00012850853,0.00023931221,0.00023697517,0.00002857053,0.00013927254,0.00016373764,0.00008702566,0.0000014307572],"category_scores_gemma":[0.00011833316,0.00011189526,0.000052429776,0.00007701944,0.000018208373,0.00029353585,0.000013440953,0.00007297266,0.0000016740177],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00084977475,0.000017195927,0.00012934011,0.000029870898,0.00044284205,0.00005003007,0.00090961775,0.9878009,0.00073845696,0.0032822576,0.0056025526,0.00014719387],"study_design_scores_gemma":[0.004032631,0.0008758651,0.0002403165,0.0007295107,0.00007513318,0.0036368677,0.0020292562,0.9235558,0.0013017496,0.0000138828445,0.06312618,0.00038279535],"about_ca_topic_score_codex":0.00002128073,"about_ca_topic_score_gemma":0.0000018384394,"teacher_disagreement_score":0.89969057,"about_ca_system_score_codex":0.00035401105,"about_ca_system_score_gemma":0.00009419297,"threshold_uncertainty_score":0.45629564},"labels":[],"label_agreement":null},{"id":"W3139226106","doi":"10.1016/j.eneco.2021.105755","title":"Ring the alarm! Electricity markets, renewables, and the pandemic","year":2021,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"Labex Ecodec; Agence Nationale de la Recherche","keywords":"Electricity market; Electricity; Renewable energy; Economics; Revenue; Natural resource economics; Electricity retailing; Business; Market economy; Finance","score_opus":0.0037875430414985463,"score_gpt":0.14895133572216857,"score_spread":0.14516379268067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3139226106","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.60641295,0.055686984,0.19007358,0.0016948044,0.0023698453,0.00038865418,0.00001431819,0.000850139,0.14250875],"genre_scores_gemma":[0.984469,0.0138574,0.00022674298,0.00019919663,0.00013639258,0.000024327142,0.000009487487,0.000031435156,0.0010460459],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937814,0.000073429066,0.00019209959,0.00013894153,0.000029876639,0.00018749798],"domain_scores_gemma":[0.9994464,0.00020753281,0.000038546215,0.0002602809,0.000017836359,0.000029417535],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032623278,0.0001045919,0.00014419697,0.000026829268,0.00010405142,0.000077607685,0.00013078628,0.00006088788,0.000015329151],"category_scores_gemma":[0.000040618914,0.00007526188,0.000036610625,0.00013420047,0.000028042059,0.000076548786,0.000038903272,0.000084749285,0.0000011029643],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000071467366,0.000021052874,0.008573122,0.000054250744,0.00058929616,0.000009394128,0.000496704,0.8574246,0.00063265197,0.07044135,0.009237715,0.05244838],"study_design_scores_gemma":[0.0005807286,0.0000031316754,0.00027118588,0.000007177708,0.000023190827,0.00006868953,0.000032194468,0.919738,0.0024254734,0.0013585826,0.075346164,0.00014547863],"about_ca_topic_score_codex":0.000055646713,"about_ca_topic_score_gemma":0.00050368975,"teacher_disagreement_score":0.37805605,"about_ca_system_score_codex":0.00010052295,"about_ca_system_score_gemma":0.000031654083,"threshold_uncertainty_score":0.30690902},"labels":[],"label_agreement":null},{"id":"W3142141614","doi":"10.1109/ccece.2010.5575104","title":"An overview of the operation of the Alberta electricity market","year":2010,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Electricity; Electricity market; Electricity retailing; Key (lock); Operator (biology); Electricity system; Industrial organization; Electricity generation; Computer science; Environmental economics; Business; Engineering; Electrical engineering; Economics; Power (physics); Computer security","score_opus":0.008079968415305033,"score_gpt":0.22087068445100574,"score_spread":0.2127907160357007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3142141614","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79430056,0.00054609455,0.028477423,0.00031779378,0.0017226894,0.0011753074,0.000006588086,0.0001319368,0.17332159],"genre_scores_gemma":[0.9989675,0.00002581238,0.00026934897,0.000025002926,0.00001642821,0.000004386965,7.5260124e-7,0.000009852146,0.00068087404],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952114,0.000051365634,0.00017255388,0.00005867754,0.00011798433,0.000078298624],"domain_scores_gemma":[0.9994777,0.000041173524,0.000041672927,0.00038340862,0.00004289573,0.00001315195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017054037,0.000057795743,0.00008422922,0.000019950185,0.000025659841,0.000007926381,0.00024464758,0.00005234816,0.0002055866],"category_scores_gemma":[0.00005500321,0.000031845553,0.000037707305,0.00031031776,0.000011497245,0.00008892899,0.000013948327,0.00009827837,0.0000013918733],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013652288,0.00015860022,0.03286026,0.00039480653,0.000111971116,8.5650086e-8,0.00076803763,0.1307198,0.7778219,0.038566153,0.012839859,0.0057449047],"study_design_scores_gemma":[0.00012585642,0.000018726749,0.030998735,0.000018576618,0.000016714377,0.000003513097,0.0000043781497,0.7096316,0.25816756,0.000059070073,0.0008765523,0.00007868299],"about_ca_topic_score_codex":0.00029756146,"about_ca_topic_score_gemma":0.0016944226,"teacher_disagreement_score":0.57891184,"about_ca_system_score_codex":0.000013403666,"about_ca_system_score_gemma":0.000022046243,"threshold_uncertainty_score":0.22510292},"labels":[],"label_agreement":null},{"id":"W3143364369","doi":"10.6000/1929-6002.2012.01.02.2","title":"Diffusion of PV in Japan and Germany-Role of Market-Based Incentive and Research and Development (R&amp;D) Investment","year":2012,"lang":"en","type":"article","venue":"Journal of Technology Innovations in Renewable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Incentive; Investment (military); Diffusion; Economics; Business; Market economy; Political science; Physics; Thermodynamics","score_opus":0.015176328058623867,"score_gpt":0.2533914346527432,"score_spread":0.23821510659411935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3143364369","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9918422,0.0028237388,0.0046684523,0.00006882577,0.000045721743,0.00006631184,8.154799e-7,0.000010133092,0.00047378242],"genre_scores_gemma":[0.98535115,0.00038161466,0.014199344,0.000006907235,0.000006992923,0.000011498446,0.0000017495138,0.000009522934,0.000031227257],"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99895006,0.000039070943,0.0005963431,0.00007322886,0.00015804543,0.00018325212],"domain_scores_gemma":[0.9993922,0.00007712579,0.0001834843,0.00010211044,0.00021829167,0.000026757833],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00077371777,0.000080472986,0.00022303019,0.0025315152,0.000027787462,0.0000049934874,0.00008418695,0.00015449827,0.000003787722],"category_scores_gemma":[0.0001165726,0.00007876126,0.000005796933,0.0016096797,0.000113665665,0.0001273692,0.00006387803,0.00017547554,3.540587e-8],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009389963,0.0005696116,0.6901215,0.0003052381,0.00012664725,0.000004420542,0.0015469097,0.023117356,0.24439079,0.013703152,0.0005093761,0.025511095],"study_design_scores_gemma":[0.005568628,0.00068265916,0.2587739,0.0019778602,0.000029460321,0.00018180828,0.0034095864,0.037185024,0.66072446,0.010318141,0.020494882,0.0006535807],"about_ca_topic_score_codex":0.00009546331,"about_ca_topic_score_gemma":0.00016999319,"teacher_disagreement_score":0.4313476,"about_ca_system_score_codex":0.00014436519,"about_ca_system_score_gemma":0.00007161165,"threshold_uncertainty_score":0.3211791},"labels":[],"label_agreement":null},{"id":"W3143389206","doi":"10.1109/mper.2002.4312289","title":"Network-Constrained Multiperiod Auction for a Pool-Based Electricity Market","year":2002,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":65,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Electricity market; Computer science; Electricity; Flexibility (engineering); Scheduling (production processes); Transparency (behavior); Operator (biology); Microeconomics; Industrial organization; Operations research; Mathematical optimization; Business; Economics; Operations management; Computer security","score_opus":0.009898701639435133,"score_gpt":0.19670590200704652,"score_spread":0.1868072003676114,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3143389206","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00024261339,0.08921741,0.9046341,0.00015657172,0.0016947299,0.0015575757,0.000015671643,0.0013824343,0.0010988573],"genre_scores_gemma":[0.9558263,0.013878517,0.026905403,0.0006928038,0.0006002897,0.0011870385,0.00004271699,0.00035140105,0.0005155259],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982808,0.00003323529,0.0005604616,0.0002993825,0.00019788678,0.000628196],"domain_scores_gemma":[0.9991689,0.00015725613,0.00007760107,0.00037226678,0.00009522043,0.00012876261],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00042637196,0.0003667163,0.0005294573,0.0001407734,0.000058347283,0.000041607655,0.00019536541,0.00013781762,0.0002726812],"category_scores_gemma":[0.00017174595,0.00039672645,0.00019988777,0.000803713,0.00001042105,0.0001553602,0.000005485892,0.00021834068,0.000041790365],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000061452333,0.000036118643,0.00001644864,0.004165392,0.00009849855,0.0000053157296,0.000022686292,0.88015705,0.0008032747,0.00003246897,0.10835329,0.0063032936],"study_design_scores_gemma":[0.00044953695,0.00006319007,0.00003181803,0.001543463,0.00007890561,0.000028483595,3.3811858e-7,0.9355305,0.0004611039,0.0000025182185,0.06137379,0.0004363788],"about_ca_topic_score_codex":0.0000016032051,"about_ca_topic_score_gemma":7.4898117e-7,"teacher_disagreement_score":0.9555837,"about_ca_system_score_codex":0.00021157623,"about_ca_system_score_gemma":0.000015475618,"threshold_uncertainty_score":0.9998485},"labels":[],"label_agreement":null},{"id":"W3144445876","doi":"10.1049/rpg2.12169","title":"Risk‐adjustable stochastic schedule based on Sobol augmented Latin hypercube sampling considering correlation of wind power uncertainties","year":2021,"lang":"en","type":"article","venue":"IET Renewable Power Generation","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Science Foundation of Beijing Municipality; National Natural Science Foundation of China","keywords":"Latin hypercube sampling; Sobol sequence; Schedule; Computer science; Sampling (signal processing); Correlation; Mathematical optimization; Mathematics; Applied mathematics; Monte Carlo method; Statistics","score_opus":0.017731901892717897,"score_gpt":0.21918025193485077,"score_spread":0.20144835004213288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3144445876","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19716366,0.0006156335,0.79814005,0.00004357285,0.0011823297,0.00033344515,0.000032435437,0.00022770072,0.0022611544],"genre_scores_gemma":[0.98554134,0.000027732209,0.013547217,0.00004718976,0.000084065105,0.000025128564,0.0002898413,0.00007436119,0.00036311575],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99807245,0.00013591301,0.00061538187,0.00038568693,0.00042392823,0.00036666222],"domain_scores_gemma":[0.9987312,0.00018152503,0.00019874146,0.0004488392,0.0003542689,0.00008540263],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00035264596,0.00029187408,0.00035176356,0.0002607993,0.0001795304,0.00010735516,0.00009313598,0.00020126525,0.0002893714],"category_scores_gemma":[0.00035456257,0.00033613387,0.00008798931,0.0006287023,0.000027563352,0.00028843863,0.000022219534,0.00020244998,0.000018281453],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017445462,0.000037545247,0.00051458605,0.0000351698,0.000052843505,0.000002300495,0.00025226278,0.8949168,0.10327574,0.000114733266,0.00067014905,0.00011047852],"study_design_scores_gemma":[0.0007048574,0.00009136609,0.0001968661,0.00012842668,0.000053803593,0.0000051342004,0.00018329444,0.8855459,0.112514086,0.000049428952,0.00023749228,0.00028934577],"about_ca_topic_score_codex":0.000116943316,"about_ca_topic_score_gemma":0.0001487663,"teacher_disagreement_score":0.7883777,"about_ca_system_score_codex":0.00024372373,"about_ca_system_score_gemma":0.00019920978,"threshold_uncertainty_score":0.99990904},"labels":[],"label_agreement":null},{"id":"W3146259529","doi":"","title":"Hydro Québec's distribution vision","year":2009,"lang":"en","type":"article","venue":"CIRED 2009 - The 20th International Conference and Exhibition on Electricity Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Distribution (mathematics); Environmental science; Mathematics","score_opus":0.009952015530038777,"score_gpt":0.2309646674076167,"score_spread":0.22101265187757793,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3146259529","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34013727,0.0010702605,0.6272673,0.009415646,0.0011491202,0.0011037696,0.001133813,0.0012330376,0.017489787],"genre_scores_gemma":[0.9958648,0.00054299517,0.000013172397,0.0002464014,0.00017102102,0.000025527876,0.0029463419,0.000013058749,0.0001766961],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984275,0.00008028383,0.00039472597,0.00031447262,0.0004359794,0.00034700654],"domain_scores_gemma":[0.99924374,0.0000648052,0.0001198716,0.00022161548,0.00025418706,0.00009578602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028188172,0.00025631976,0.00019383532,0.00009705764,0.0002836426,0.00019897993,0.00023700904,0.00015730862,0.00007408656],"category_scores_gemma":[0.00011587745,0.00022271644,0.00007648855,0.00044326892,0.00005210926,0.00039997103,0.00001477748,0.00031382334,0.00006444749],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007809743,0.0009833127,0.0009034358,0.00008199567,0.00032595458,0.000030651987,0.0005257899,0.034467313,0.049955547,0.33086148,0.20651262,0.3745709],"study_design_scores_gemma":[0.0017499464,0.0012013343,0.031378094,0.00026383184,0.00008610678,0.00011841162,0.00007149749,0.8977754,0.02941046,0.008431366,0.028538985,0.00097452855],"about_ca_topic_score_codex":0.00012944649,"about_ca_topic_score_gemma":0.00005694827,"teacher_disagreement_score":0.86330813,"about_ca_system_score_codex":0.0005836978,"about_ca_system_score_gemma":0.00006758726,"threshold_uncertainty_score":0.9082113},"labels":[],"label_agreement":null},{"id":"W3146383562","doi":"10.1109/mper.2002.4312292","title":"On Walrasian Equilibrium for Pool-Based Electricity Markets","year":2002,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Hydro-Québec","funders":"","keywords":"Commodity; Economics; Convergence (economics); Electricity; Electricity market; Market power; Market clearing; Duality (order theory); Mathematical economics; Competition (biology); Microeconomics; Clearing; Mathematical optimization; Balance (ability); Competitive equilibrium; Mathematics; Market economy","score_opus":0.009619603807664,"score_gpt":0.20688318538313322,"score_spread":0.19726358157546922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3146383562","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025596262,0.14879581,0.83070815,0.00068335264,0.0033367886,0.0032066281,0.000041083716,0.0030306187,0.0076379236],"genre_scores_gemma":[0.9900823,0.0048174825,0.0032542385,0.0006216183,0.00014663492,0.0004639745,0.000022650229,0.00025730452,0.0003337512],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99833554,0.000028184648,0.00048251823,0.00031053126,0.00025270172,0.0005905069],"domain_scores_gemma":[0.99899596,0.00024445658,0.000058922957,0.00048518548,0.000066692075,0.00014879133],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032822246,0.0003761679,0.0005008598,0.00020872378,0.000029289082,0.000037002403,0.000267311,0.00012044426,0.0002070502],"category_scores_gemma":[0.00024151741,0.00039049026,0.00020646871,0.00068461464,0.0000062854306,0.00012391778,0.0000060483726,0.00022465031,0.00014830563],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019309673,0.00015302925,0.000012202358,0.015369718,0.00022316696,0.000024356767,0.000042862925,0.66138387,0.005369316,0.0004374974,0.3046314,0.01233324],"study_design_scores_gemma":[0.000501916,0.00013576185,0.000033657685,0.0027932622,0.000072107,0.000016849683,1.7514131e-7,0.9241818,0.004963717,0.00000755776,0.06668131,0.00061186496],"about_ca_topic_score_codex":6.6110283e-7,"about_ca_topic_score_gemma":1.9263884e-7,"teacher_disagreement_score":0.9875227,"about_ca_system_score_codex":0.00022663818,"about_ca_system_score_gemma":0.000011584922,"threshold_uncertainty_score":0.9998547},"labels":[],"label_agreement":null},{"id":"W3151022368","doi":"10.1109/mper.2002.4312573","title":"Combined Pool/Bilateral Dispatch, Part II: Curtailment of Firm and Nonfirm Contracts","year":2002,"lang":"en","type":"article","venue":"IEEE Power Engineering Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Bidding; Revenue; Microeconomics; Business; Payment; Industrial organization; Commodity; Economics; Finance","score_opus":0.007814234167380463,"score_gpt":0.18568473576863342,"score_spread":0.17787050160125295,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3151022368","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24524158,0.6955423,0.040615216,0.0008560098,0.00695618,0.0038796018,0.000072262636,0.002088674,0.0047481735],"genre_scores_gemma":[0.95736575,0.04171666,0.0004863736,0.00007338118,0.000044342156,0.00006501755,0.0000079648335,0.00006813008,0.00017240648],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99860513,0.000018271812,0.00059781113,0.00021285526,0.00021122926,0.0003547188],"domain_scores_gemma":[0.99932384,0.000057867885,0.00008363282,0.00034322395,0.000053804848,0.00013761088],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019486084,0.00029261503,0.00058486,0.00008997294,0.000029957846,0.000019083567,0.00014512225,0.00008467429,0.00018787583],"category_scores_gemma":[0.000051936255,0.0002882788,0.000090116686,0.0002960095,0.000014365102,0.00016413203,0.000021607055,0.0001716853,0.000022438364],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004220859,0.0011863542,0.004518123,0.072246894,0.002339443,0.00023595383,0.0033601895,0.625722,0.022607494,0.0019701172,0.22106901,0.044702224],"study_design_scores_gemma":[0.0027939554,0.00074671255,0.003084067,0.024916684,0.00052053214,0.00016845323,0.000006272464,0.6646505,0.007877842,0.000012593801,0.29285595,0.002366409],"about_ca_topic_score_codex":0.000004205927,"about_ca_topic_score_gemma":6.5184406e-7,"teacher_disagreement_score":0.7121241,"about_ca_system_score_codex":0.00006591645,"about_ca_system_score_gemma":0.000004894032,"threshold_uncertainty_score":0.99995697},"labels":[],"label_agreement":null},{"id":"W3152578958","doi":"10.1016/j.eneco.2021.105275","title":"On the long-term merit order effect of renewable energies","year":2021,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":91,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Bundesministerium für Wirtschaft und Energie","keywords":"Renewable energy; Economics; Investment (military); Term (time); Portfolio; Electricity; Order (exchange); Renewable portfolio standard; Nameplate capacity; Microeconomics; Environmental economics; Natural resource economics; Electricity generation; Power (physics); Feed-in tariff; Energy policy; Engineering; Financial economics; Finance","score_opus":0.0034681227770886835,"score_gpt":0.16736337752184965,"score_spread":0.16389525474476097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3152578958","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95829916,0.0010798913,0.01274513,0.000062530475,0.0008007328,0.00005375373,0.000004875107,0.000113166134,0.02684075],"genre_scores_gemma":[0.99791396,0.00057217234,0.00013830734,0.00003975718,0.0000632363,0.000022114475,0.000023255703,0.0000358599,0.0011913414],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99947345,0.000045357807,0.00018616831,0.00012094896,0.000033661014,0.00014038655],"domain_scores_gemma":[0.9993941,0.00020535245,0.000042272066,0.0003092335,0.000025768135,0.000023248183],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000103440936,0.00011433389,0.00018406623,0.000042552343,0.00002945425,0.000025186844,0.000117946554,0.000060943337,0.00010559624],"category_scores_gemma":[0.000040418672,0.00009573102,0.00004831925,0.00013815431,0.000012992612,0.000058596746,0.000020976615,0.000043873883,0.000005382932],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006563903,0.00000663381,0.00071549654,0.00002728573,0.00008472781,0.0000025626061,0.000021974854,0.99140495,0.0009091084,0.0048670587,0.0009094267,0.0010442383],"study_design_scores_gemma":[0.00036797463,0.000083137515,0.00011952854,0.000043926822,0.000026816511,0.000013092322,0.000006913835,0.22845168,0.76686555,0.00020104027,0.0035928523,0.00022748084],"about_ca_topic_score_codex":0.000038650658,"about_ca_topic_score_gemma":0.00014577605,"teacher_disagreement_score":0.76595646,"about_ca_system_score_codex":0.00006989138,"about_ca_system_score_gemma":0.000022736749,"threshold_uncertainty_score":0.3903798},"labels":[],"label_agreement":null},{"id":"W3153200444","doi":"10.2139/ssrn.3520559","title":"Strategic Storage Use in a Hydro-Thermal Power System with Carbon Constraints","year":2020,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Arbitrage; Renewable energy; Variable renewable energy; Production (economics); Carbon price; Environmental economics; Electricity generation; Thermal energy storage; Software deployment; Electricity; Electricity market; Constraint (computer-aided design); Industrial organization; Business; Economics; Environmental science; Microeconomics; Energy storage; Natural resource economics; Power (physics); Computer science; Engineering; Climate change; Electrical engineering; Finance; Ecology","score_opus":0.00780943222078111,"score_gpt":0.17340735547116912,"score_spread":0.165597923250388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3153200444","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9662543,0.0011366032,0.026445488,0.00006426063,0.00014458163,0.00026218555,0.0000023657378,0.00026489454,0.005425317],"genre_scores_gemma":[0.9996088,0.00008505826,0.0000800921,0.000021283115,0.0000906768,0.000007699612,0.0000025355232,0.000070150956,0.000033707405],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973882,0.000104216546,0.0003713567,0.00020308499,0.00028239423,0.0016507616],"domain_scores_gemma":[0.9995455,0.00002770047,0.00009559909,0.00013409043,0.000048633807,0.00014847814],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047308143,0.00024062528,0.00028892563,0.00014917688,0.000044082302,0.00009817299,0.00019786341,0.00010700083,0.00001494297],"category_scores_gemma":[0.000013115893,0.00021863477,0.000048284983,0.0004917351,0.0000289411,0.0002540573,0.0000096895665,0.0015975647,0.0000118077505],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021894308,0.000056459103,0.006093755,0.000157008,0.00055775733,0.0005091014,0.0014531995,0.9502695,0.006260847,0.033656005,0.000018618279,0.0007488161],"study_design_scores_gemma":[0.005130842,0.00163202,0.00094750995,0.00042748364,0.000103204875,0.004391841,0.0068313936,0.97839886,0.00046663845,0.00035673802,0.000055026085,0.0012584196],"about_ca_topic_score_codex":0.000045042696,"about_ca_topic_score_gemma":0.00031443386,"teacher_disagreement_score":0.03335449,"about_ca_system_score_codex":0.0015712132,"about_ca_system_score_gemma":0.00083797035,"threshold_uncertainty_score":0.8915667},"labels":[],"label_agreement":null},{"id":"W3161883275","doi":"10.1109/icjece.2021.3059275","title":"A Game Theory Strategy-Based Bidding Evaluation for Power Generation Market","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bidding; Profit (economics); Computer science; Game theory; Mathematical optimization; Particle swarm optimization; Market clearing; Electricity market; Operations research; Microeconomics; Economics; Electricity; Mathematics; Engineering","score_opus":0.010423364650158968,"score_gpt":0.18954318328344774,"score_spread":0.17911981863328877,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3161883275","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039665155,0.0034373747,0.9560703,0.000026537406,0.00051205215,0.00011660767,0.0000029557787,0.000023617074,0.00014536934],"genre_scores_gemma":[0.9917489,0.000013472253,0.00791005,0.000041250427,0.00023362807,0.0000070938104,0.0000088756615,0.00002387896,0.000012826851],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992396,0.000038496975,0.0002623651,0.00009778445,0.00012031347,0.00024141838],"domain_scores_gemma":[0.9992942,0.000112408394,0.00004086318,0.00006683332,0.00025730443,0.00022836193],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042889273,0.00011310273,0.00016206407,0.0002715969,0.000037264414,0.000106213265,0.000062725834,0.000069664566,0.000025710211],"category_scores_gemma":[0.000085815045,0.00011905124,0.000057939258,0.00030663353,0.000004507095,0.000119050535,0.0000020886755,0.0001349484,3.179581e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000386599,0.000004164399,0.000054356085,0.000028730648,0.000058476042,0.000022371996,0.00004564044,0.97349405,0.0011043813,0.0013069535,0.0010424085,0.022834623],"study_design_scores_gemma":[0.0003944537,0.00009419038,0.0004785111,0.00004946889,0.000033593846,0.0001075043,0.0000019049894,0.99592716,0.0013829122,0.000100629964,0.0012999766,0.00012969569],"about_ca_topic_score_codex":0.0000050120543,"about_ca_topic_score_gemma":0.000043328102,"teacher_disagreement_score":0.95208377,"about_ca_system_score_codex":0.00020612853,"about_ca_system_score_gemma":0.0003937772,"threshold_uncertainty_score":0.48547688},"labels":[],"label_agreement":null},{"id":"W3162671986","doi":"10.1109/tpwrs.2021.3081557","title":"Sample Robust Scheduling of Electricity-Gas Systems Under Wind Power Uncertainty","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"National Key Research and Development Program of China Stem Cell and Translational Research; State Grid Corporation of China","keywords":"Wind power; Electricity; Power to gas; Environmental science; Scheduling (production processes); Sample (material); Computer science; Engineering; Operations management; Electrical engineering; Physics","score_opus":0.013259328146863168,"score_gpt":0.20885966650124116,"score_spread":0.19560033835437798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3162671986","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021564823,0.002228147,0.9659084,0.000030389374,0.006562947,0.00062821526,0.00013510023,0.0005416807,0.0024003119],"genre_scores_gemma":[0.99842054,0.00012191445,0.00066632096,0.000020806037,0.000035464305,0.00006671196,0.000019699384,0.00013606482,0.00051245943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9968399,0.00025630728,0.0010526452,0.00052437314,0.00067156006,0.0006552217],"domain_scores_gemma":[0.9979429,0.0004144734,0.00019071891,0.00079719414,0.00045893653,0.00019573714],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00044431508,0.0004547177,0.0007488517,0.0004776938,0.00017970453,0.0001635889,0.00027768945,0.00036653236,0.000110463014],"category_scores_gemma":[0.000027661394,0.0004911543,0.0002402549,0.0015992536,0.000039800412,0.00028954018,0.0000020669318,0.00051638705,0.00006361906],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020225218,0.0001274876,0.000018298226,0.00026893558,0.0003562221,0.000013053345,0.00030309331,0.9920565,0.0058745085,0.0006422707,0.00027622655,0.000043205426],"study_design_scores_gemma":[0.0011930334,0.00024633118,0.000029297553,0.0007104111,0.00016422318,0.0002534458,0.0013780232,0.969574,0.023585508,0.000018234216,0.0019661146,0.0008814048],"about_ca_topic_score_codex":0.00039813243,"about_ca_topic_score_gemma":0.000035515717,"teacher_disagreement_score":0.97685575,"about_ca_system_score_codex":0.00057943095,"about_ca_system_score_gemma":0.00019730169,"threshold_uncertainty_score":0.999754},"labels":[],"label_agreement":null},{"id":"W3165363420","doi":"10.1186/s43067-020-00026-3","title":"A meliorated Harris Hawks optimizer for combinatorial unit commitment problem with photovoltaic applications","year":2021,"lang":"en","type":"article","venue":"Journal of Electrical Systems and Information Technology","topic":"Electric Power System Optimization","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"University of Calgary","keywords":"Mathematical optimization; Schedule; Photovoltaic system; Computer science; Electric power system; Electricity generation; Wind power; Electric power; Optimization problem; Power (physics); Engineering; Electrical engineering; Mathematics","score_opus":0.0045689881953801924,"score_gpt":0.19563350985833197,"score_spread":0.1910645216629518,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3165363420","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009949754,0.0037101775,0.98355126,0.00021141245,0.00032463993,0.0012952144,0.00001315591,0.00021543441,0.00072894973],"genre_scores_gemma":[0.97925806,0.0008943016,0.019077834,0.000046507685,0.00011451433,0.00048412682,0.000045252076,0.000030340738,0.000049059097],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99876964,0.000025302379,0.0007427648,0.000068683206,0.00018401175,0.00020961797],"domain_scores_gemma":[0.99845845,0.00006038574,0.00036478238,0.00012946548,0.0009138339,0.000073103925],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023145512,0.0001325904,0.0003434687,0.00040904767,0.00009250226,0.000099934296,0.00011770272,0.000218756,0.0000029846187],"category_scores_gemma":[0.000048105194,0.000108035216,0.000037444825,0.0010741143,0.000021939946,0.00063294574,0.000012539281,0.00025302288,0.0000026315906],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010050139,0.0008613593,0.0029156404,0.0035945405,0.0033621513,0.00006388428,0.0008539231,0.35515535,0.02769932,0.5027364,0.030499812,0.071252584],"study_design_scores_gemma":[0.007218959,0.0019586717,0.000052532865,0.00026267752,0.00020668788,0.0017345602,0.00031862454,0.39787757,0.023283474,0.0016401003,0.5648969,0.0005492309],"about_ca_topic_score_codex":0.0000028259449,"about_ca_topic_score_gemma":7.4175455e-7,"teacher_disagreement_score":0.9693083,"about_ca_system_score_codex":0.0001392155,"about_ca_system_score_gemma":0.0001191826,"threshold_uncertainty_score":0.44055483},"labels":[],"label_agreement":null},{"id":"W3169373037","doi":"10.1109/access.2021.3085819","title":"A Modified Hybrid Particle Swarm Optimization With Bat Algorithm Parameter Inspired Acceleration Coefficients for Solving Eco-Friendly and Economic Dispatch Problems","year":2021,"lang":"en","type":"article","venue":"IEEE Access","topic":"Electric Power System Optimization","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Particle swarm optimization; Economic dispatch; Computer science; Mathematical optimization; Convergence (economics); Electric power system; Algorithm; Hybrid algorithm (constraint satisfaction); Metaheuristic; Acceleration; Renewable energy; Hybrid power; Power (physics); Engineering; Mathematics","score_opus":0.0156128917803038,"score_gpt":0.23555998930356029,"score_spread":0.21994709752325647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3169373037","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34396133,0.0001017669,0.65490264,0.000024469939,0.00029921922,0.00048618423,0.00002124236,0.00014193571,0.00006119474],"genre_scores_gemma":[0.98022914,0.00006333629,0.019098315,0.000029322815,0.00007341541,0.00029422453,0.00011149645,0.00006348099,0.00003728331],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99883664,0.00002539728,0.00033290204,0.0003579373,0.00012115109,0.00032599503],"domain_scores_gemma":[0.9993906,0.00008851558,0.00008793011,0.00022802698,0.00011930672,0.000085621294],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012806544,0.00019450692,0.00022523444,0.0000716512,0.0001285607,0.00048246284,0.00014469044,0.000065023545,0.000010135148],"category_scores_gemma":[0.000025409096,0.00019878613,0.000030937445,0.00020897729,0.000017986045,0.00095460145,0.00002831977,0.000073557356,0.0000028097309],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013338027,0.000031345502,0.00072167214,0.000087618646,0.00004681348,0.0000029935488,0.000120001394,0.9930883,0.0005006792,0.00001150295,0.0001343671,0.005241371],"study_design_scores_gemma":[0.0010429416,0.000062643805,0.00013429612,0.00004677986,0.000036751666,0.000016543714,0.00001387216,0.9389174,0.05941894,0.00002219664,0.000043320073,0.00024432468],"about_ca_topic_score_codex":0.00003347434,"about_ca_topic_score_gemma":0.00006237655,"teacher_disagreement_score":0.6362678,"about_ca_system_score_codex":0.00015280911,"about_ca_system_score_gemma":0.00005565777,"threshold_uncertainty_score":0.8106263},"labels":[],"label_agreement":null},{"id":"W3171241085","doi":"10.1016/j.cor.2021.105398","title":"Chance constrained unit commitment approximation under stochastic wind energy","year":2021,"lang":"en","type":"article","venue":"Computers & Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Laurentian University","funders":"National Science Foundation","keywords":"Mathematical optimization; Wind power; Computer science; Intermittency; Power system simulation; Time horizon; Renewable energy; Scheduling (production processes); Electric power system; Power (physics); Mathematics; Engineering; Electrical engineering","score_opus":0.04731758283479383,"score_gpt":0.30431309412673535,"score_spread":0.25699551129194154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3171241085","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007529653,0.00054421485,0.9887283,0.0005054207,0.0003610852,0.00027663537,0.0000076075926,0.00017736776,0.0018697032],"genre_scores_gemma":[0.9886048,0.000050030423,0.010119851,0.00006604966,0.0001189804,0.000074689306,0.0002170678,0.000032174645,0.0007163823],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99845964,0.00024988953,0.00025944534,0.00024861662,0.00041690946,0.0003654953],"domain_scores_gemma":[0.9988336,0.00016688491,0.000009470937,0.0003663294,0.0005181108,0.000105630934],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003383744,0.000130671,0.00015442968,0.00025623912,0.0003065986,0.00024887675,0.00019466125,0.00007950063,0.00008658275],"category_scores_gemma":[0.000046225578,0.00014775028,0.000030905914,0.0009880709,0.00006628122,0.00020217613,0.0000717531,0.00023559965,0.00005697849],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000016639361,0.000040657233,0.000003223494,0.000020884949,0.000035311412,0.000005396787,0.0002261297,0.9748682,0.0018101434,0.018893879,0.0012249361,0.0028696093],"study_design_scores_gemma":[0.00035271826,0.000034583103,0.00008821979,0.000055669316,0.000004808927,0.000027792821,0.00014073374,0.9955988,0.0028295887,0.000134776,0.00058901217,0.0001432878],"about_ca_topic_score_codex":0.000028646578,"about_ca_topic_score_gemma":0.0000857721,"teacher_disagreement_score":0.9810751,"about_ca_system_score_codex":0.00024408239,"about_ca_system_score_gemma":0.00020607944,"threshold_uncertainty_score":0.6025082},"labels":[],"label_agreement":null},{"id":"W3173726148","doi":"10.1016/j.eneco.2021.105390","title":"Microeconomic models of electricity storage: Price Forecasting, arbitrage limits, curtailment insurance, and transmission line utilization","year":2021,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"University of British Columbia","keywords":"Arbitrage; Economics; Electricity; Profitability index; Electricity market; Microeconomics; Energy storage; Power (physics); Financial economics; Finance; Engineering","score_opus":0.020404915434040074,"score_gpt":0.19116660933957436,"score_spread":0.17076169390553428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3173726148","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.52161306,0.0042508817,0.4700471,0.000017095099,0.00017473655,0.00008225459,0.00001550628,0.0000810771,0.0037182877],"genre_scores_gemma":[0.9884965,0.0074587404,0.0036709441,0.000031165666,0.000046274992,0.00001258822,0.00006957802,0.000047336478,0.00016691706],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989944,0.000029281073,0.00046187075,0.0002543767,0.000036677415,0.00022339432],"domain_scores_gemma":[0.999511,0.000044576667,0.00012412312,0.00018460258,0.000057835587,0.00007784788],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011954391,0.00017533859,0.00028631717,0.00012710718,0.000042150503,0.00002790691,0.00008593167,0.00012095096,0.000015106912],"category_scores_gemma":[0.000009812652,0.0002180331,0.000049810864,0.0001798617,0.000013345242,0.00027508492,0.00001373237,0.000105317056,4.897866e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000133221165,0.000037795926,0.00034618686,0.00010171884,0.00005777529,0.0000021465069,0.0001319917,0.9763726,0.002890472,0.002065716,0.00007649579,0.017903801],"study_design_scores_gemma":[0.00037708902,0.000030696723,0.00009325991,0.0000303375,0.000013162826,0.000019759616,0.000008744453,0.915145,0.08059814,0.00045005055,0.0030513648,0.00018243777],"about_ca_topic_score_codex":0.000022656333,"about_ca_topic_score_gemma":0.00004287597,"teacher_disagreement_score":0.46688336,"about_ca_system_score_codex":0.00016549793,"about_ca_system_score_gemma":0.00007312464,"threshold_uncertainty_score":0.8891132},"labels":[],"label_agreement":null},{"id":"W3184426318","doi":"","title":"Net metering in British Columbia : white paper","year":2003,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"White (mutation); White paper; Metering mode; Geography; Engineering; Archaeology","score_opus":0.0035495143888863104,"score_gpt":0.1593074587334295,"score_spread":0.15575794434454318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3184426318","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49283206,0.00089673814,0.10212191,0.000012683129,0.0007838471,0.0003958097,0.0000025001427,0.00088359235,0.40207085],"genre_scores_gemma":[0.9926076,0.00003449345,0.004321047,0.000035519133,0.000009111182,0.000015997839,0.0000019476856,0.000023344945,0.0029509638],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994947,0.00002029114,0.0001509457,0.00009264848,0.00006221031,0.00017922037],"domain_scores_gemma":[0.9998464,0.000010312619,0.0000073754572,0.000095634634,0.000010161784,0.000030106085],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010181574,0.000043891112,0.000091992326,0.000027808921,0.000014150527,0.00012869961,0.000044749286,0.000044792712,0.0008491275],"category_scores_gemma":[0.000017548002,0.00008312487,0.000014790335,0.00025724457,0.0000027548947,0.00015196222,0.0000044215367,0.00005821983,0.000020617328],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000015711806,0.00008278205,0.3352309,0.00028248486,0.00010295137,0.00015059301,0.000745047,0.53801197,0.0073638484,0.0002745404,0.09185704,0.025896287],"study_design_scores_gemma":[0.0041688397,0.0001581227,0.25404066,0.0005048783,0.000043559237,0.00070344046,0.0005030352,0.5540211,0.0022886484,0.00055638433,0.18023892,0.002772377],"about_ca_topic_score_codex":0.0016117884,"about_ca_topic_score_gemma":0.06371706,"teacher_disagreement_score":0.49977553,"about_ca_system_score_codex":0.00005927617,"about_ca_system_score_gemma":0.000006169813,"threshold_uncertainty_score":0.95336765},"labels":[],"label_agreement":null},{"id":"W3191335747","doi":"10.1109/tpwrs.2021.3100782","title":"An Incentive Compatible Iterative Mechanism for Coupling Electricity Markets","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"National Science Foundation of Sri Lanka","keywords":"Market clearing; Electricity market; Incentive; Incentive compatibility; Electricity; Microeconomics; Nash equilibrium; Marginal cost; Clearing; Economics; Market mechanism; Market power; Computer science; Mathematical optimization; Monopoly; Engineering; Market economy; Finance","score_opus":0.009862835102707905,"score_gpt":0.227486651815169,"score_spread":0.2176238167124611,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3191335747","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012886282,0.0002632699,0.9809083,0.000012280226,0.0035167604,0.0008465588,0.00012745206,0.0005369626,0.00090218405],"genre_scores_gemma":[0.99782795,0.00005012693,0.0012363228,0.000030800937,0.000026308133,0.00032993066,0.000028063,0.00008304965,0.00038747632],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99837565,0.00009619709,0.00045485335,0.00038876143,0.0002745259,0.00041003712],"domain_scores_gemma":[0.99879396,0.00017265895,0.00007738842,0.0003812426,0.00044451558,0.00013023701],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023785197,0.00028033927,0.00037371254,0.00022708728,0.00021751935,0.00015206223,0.00015160113,0.00017107921,0.000038836028],"category_scores_gemma":[0.0000074009104,0.0003145372,0.00011735894,0.00064143405,0.000011632395,0.0003616204,5.327411e-7,0.00023450928,0.000024534522],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006777285,0.00024983933,0.0000077449295,0.00021135111,0.0003190396,0.000015143962,0.0009437085,0.96220654,0.03340288,0.0019045813,0.0004830374,0.00018833313],"study_design_scores_gemma":[0.0005678163,0.00016285134,0.000010962178,0.000110684145,0.000044057313,0.000024762834,0.00020877352,0.8258013,0.172537,0.000033516517,0.00019479683,0.0003034926],"about_ca_topic_score_codex":0.0000201006,"about_ca_topic_score_gemma":0.000023514714,"teacher_disagreement_score":0.98494166,"about_ca_system_score_codex":0.00036443677,"about_ca_system_score_gemma":0.00007414501,"threshold_uncertainty_score":0.9999307},"labels":[],"label_agreement":null},{"id":"W3198143394","doi":"10.1109/icecce52056.2021.9514130","title":"A Modified Ant Lion Optimization Technique for Economic Emission Dispatch Including Biomass","year":2021,"lang":"en","type":"article","venue":"2021 International Conference on Electrical, Communication, and Computer Engineering (ICECCE)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Electricity generation; Biomass (ecology); Fossil fuel; Economic dispatch; Simulated annealing; Automotive engineering; Schedule; Electric power system; Environmental science; Thermal power station; Computer science; Process engineering; Power (physics); Engineering; Electrical engineering; Waste management; Algorithm; Ecology","score_opus":0.02042009838245781,"score_gpt":0.25039318737159216,"score_spread":0.22997308898913435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3198143394","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0024613724,0.00050657324,0.9939639,0.00044497076,0.0007578417,0.00040120358,0.000015377516,0.0002461568,0.0012025905],"genre_scores_gemma":[0.9429157,0.0025164795,0.053243555,0.000038504502,0.00021806796,0.0002683228,0.0004696708,0.00006653777,0.0002631881],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986707,0.000061778155,0.00046924516,0.00035119132,0.00018044857,0.00026665282],"domain_scores_gemma":[0.99885774,0.00021856376,0.000101231206,0.00044715335,0.00027269515,0.00010259429],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022939216,0.00026343076,0.00026907382,0.0002679283,0.0002240217,0.000415237,0.0004413095,0.00016295363,0.000040341776],"category_scores_gemma":[0.00004739334,0.00030145666,0.00007571122,0.00028897007,0.00001627375,0.00025936266,0.00011430488,0.0002470068,0.0000045954766],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021872716,0.00007265225,0.00008136988,0.00006838748,0.00013599549,0.0000023730904,0.00011164294,0.9670676,0.0117363855,0.016143765,0.001710163,0.0028477854],"study_design_scores_gemma":[0.0004224596,0.000060348753,0.000092335016,0.00016939336,0.000017550301,0.000026693302,0.000006031288,0.9872924,0.009902704,0.00023091846,0.0014664154,0.0003127195],"about_ca_topic_score_codex":0.000017717834,"about_ca_topic_score_gemma":0.0000048139236,"teacher_disagreement_score":0.9407204,"about_ca_system_score_codex":0.00036665495,"about_ca_system_score_gemma":0.000093103656,"threshold_uncertainty_score":0.99994373},"labels":[],"label_agreement":null},{"id":"W3202479321","doi":"10.2139/ssrn.3936984","title":"Private Risk and Social Resilience in Liberalized Electricity Markets","year":2021,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Resilience (materials science); Business; Electricity; Economics; Natural resource economics","score_opus":0.0031351949199745228,"score_gpt":0.1963774557806966,"score_spread":0.19324226086072208,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3202479321","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9080571,0.009522488,0.08075692,0.00017264522,0.00016960358,0.0001275375,0.0000017221124,0.00011412763,0.0010778758],"genre_scores_gemma":[0.98493904,0.0142227905,0.00033623737,0.000023605631,0.0000961053,0.000005635907,0.0000029902515,0.000033353146,0.0003402301],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.997377,0.00023974375,0.00034270633,0.00019619257,0.00021275836,0.0016316304],"domain_scores_gemma":[0.9996385,0.00006264439,0.00008661706,0.00010536569,0.00005615266,0.000050746003],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012649978,0.0001620133,0.00023358215,0.00017457102,0.0001486578,0.000076861135,0.00014039797,0.00011230646,0.000014029749],"category_scores_gemma":[0.0001062106,0.00017406666,0.00005237444,0.0006674949,0.00001784147,0.00023233505,0.000024365621,0.001651173,0.000005092763],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010104722,0.0006490594,0.18621424,0.00050077937,0.0019029288,0.0005939544,0.0067216298,0.0532684,0.04924778,0.17189862,0.0028455504,0.5251466],"study_design_scores_gemma":[0.018759064,0.0008348492,0.17741057,0.00035492022,0.0004115755,0.010587848,0.002022393,0.35047314,0.021382965,0.40272823,0.010857217,0.004177246],"about_ca_topic_score_codex":0.000014696296,"about_ca_topic_score_gemma":0.00035455992,"teacher_disagreement_score":0.52096933,"about_ca_system_score_codex":0.00096952205,"about_ca_system_score_gemma":0.0005641908,"threshold_uncertainty_score":0.7173617},"labels":[],"label_agreement":null},{"id":"W3209711571","doi":"10.35833/mpce.2020.000580","title":"Dynamic-decision-based Real-time Dispatch for Reducing Constraint Violations","year":2022,"lang":"en","type":"article","venue":"Journal of Modern Power Systems and Clean Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Economic dispatch; Constraint (computer-aided design); Process (computing); Computer science; Electric power system; Point (geometry); Identification (biology); Moment (physics); Mathematical optimization; Power (physics); Operations research; Engineering; Mathematics","score_opus":0.004726863144434747,"score_gpt":0.20273304703731346,"score_spread":0.19800618389287872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3209711571","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.047026724,0.0013144646,0.9493319,0.00004662908,0.00114604,0.0001464578,0.000046214198,0.00006261355,0.0008789814],"genre_scores_gemma":[0.9973056,0.00006862508,0.002266671,0.000014772569,0.000044879376,0.000026374131,0.000011685002,0.000055061737,0.00020638164],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985334,0.00007524025,0.0006964097,0.00014724745,0.0003245245,0.00022313357],"domain_scores_gemma":[0.99904627,0.00021705404,0.00029158324,0.0001800572,0.00014611724,0.000118938915],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00053333526,0.00015692445,0.00035203923,0.00024458498,0.00018868838,0.000069154776,0.00015709923,0.00006032606,0.000028638604],"category_scores_gemma":[0.000028603334,0.00015186332,0.000118312215,0.00017023287,0.000015803684,0.00012344227,0.00002203508,0.00014011595,4.054864e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046897683,0.000032034324,0.000028623745,0.00003349066,0.000079926496,0.000010283414,0.00021123333,0.9844339,0.002827759,0.000527348,0.0014722381,0.010296289],"study_design_scores_gemma":[0.0007175368,0.00023575187,0.0000622357,0.00011936954,0.000033036496,0.00021129352,0.00021646719,0.99531484,0.00007052908,0.00020173137,0.0026468614,0.00017033562],"about_ca_topic_score_codex":0.000037279526,"about_ca_topic_score_gemma":0.000009784329,"teacher_disagreement_score":0.9502788,"about_ca_system_score_codex":0.00027747982,"about_ca_system_score_gemma":0.000090346184,"threshold_uncertainty_score":0.61928064},"labels":[],"label_agreement":null},{"id":"W3212804852","doi":"10.1109/iecon48115.2021.9589362","title":"Distributed Economic Dispatch over Strongly Connected Communication Networks","year":2021,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Economic dispatch; Benchmark (surveying); Computer science; Electric power system; Telecommunications network; Distributed algorithm; Mathematical optimization; Control (management); Power (physics); Distributed computing; Computer network; Mathematics","score_opus":0.00390533302642488,"score_gpt":0.18839326249301053,"score_spread":0.18448792946658565,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3212804852","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09272515,0.0010164842,0.89469784,0.00009647574,0.0003828526,0.00014951898,0.000029343737,0.00069903577,0.010203288],"genre_scores_gemma":[0.9975752,0.00016434176,0.0011552494,0.000014495462,0.000035429217,0.000014627197,0.00081833533,0.000025272102,0.00019700233],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940145,0.000045805013,0.00021006874,0.00011633606,0.000047138838,0.00017923024],"domain_scores_gemma":[0.99941707,0.00007472875,0.000027548656,0.00039534044,0.000038143895,0.000047143294],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000063115476,0.0001002132,0.00013064465,0.000024096544,0.000041964533,0.000057913992,0.00011576024,0.000080169106,0.00042719155],"category_scores_gemma":[0.0000143604775,0.00011252129,0.00003209503,0.00016850319,0.000008111262,0.00013696788,0.000031185973,0.000106846725,0.000036960897],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000016663142,0.00000875583,0.002948636,0.000007661313,0.00004566151,0.0000014344571,0.000018272325,0.9845576,0.00009867067,0.0021484238,0.009852786,0.00031042483],"study_design_scores_gemma":[0.0002720503,0.0000048998318,0.006765649,0.000012285309,0.000011230771,0.0000052290316,0.000020958465,0.9902652,0.0006187752,0.000021994701,0.0018661033,0.00013562702],"about_ca_topic_score_codex":0.0000406184,"about_ca_topic_score_gemma":0.00027814286,"teacher_disagreement_score":0.90485007,"about_ca_system_score_codex":0.0002069149,"about_ca_system_score_gemma":0.000023025637,"threshold_uncertainty_score":0.4677448},"labels":[],"label_agreement":null},{"id":"W3215277578","doi":"10.32920/ryerson.14664810.v1","title":"Security Constrained Stochastic Power System Scheduling Algorithms - With Wind Electric Generators","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; University of New Brunswick","funders":"","keywords":"Probabilistic logic; Electric power system; Wind power; Mathematical optimization; Scheduling (production processes); Computer science; Economic dispatch; Power system simulation; Power (physics); Transmission (telecommunications); Transmission system; Engineering; Reliability engineering; Control theory (sociology); Electrical engineering; Mathematics; Telecommunications","score_opus":0.005058629449334553,"score_gpt":0.1879276741785331,"score_spread":0.18286904472919854,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3215277578","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1117922,0.002688633,0.87573576,0.000012587254,0.0015368968,0.00093998795,0.00002085988,0.0018207721,0.005452295],"genre_scores_gemma":[0.9781388,0.000022237058,0.02115961,0.000015103048,0.00021480888,0.000080436694,0.00014264078,0.00017998755,0.000046349505],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970795,0.0001125198,0.0007734688,0.0007861637,0.0005593111,0.00068907347],"domain_scores_gemma":[0.9984062,0.00007533127,0.00019636532,0.000743016,0.0003481573,0.00023096094],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00035005767,0.00071654865,0.0008630847,0.00043016678,0.00009795701,0.00035884575,0.0003472872,0.00063764595,0.000073237024],"category_scores_gemma":[0.000041860723,0.0006918876,0.0001460359,0.00090750575,0.000032054773,0.00014375421,0.00013151216,0.0010957827,0.000019327266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000061355827,0.000023873205,0.000027219026,0.00070626696,0.0004705412,0.00008521905,0.00031994435,0.9973692,0.00045024537,0.00035307943,0.000065464716,0.00012277816],"study_design_scores_gemma":[0.00048583452,0.000056972574,0.0000135800265,0.0007212784,0.00015360641,0.0002523065,0.0004269322,0.99418724,0.0028096328,0.000010324892,0.000008026772,0.00087427907],"about_ca_topic_score_codex":0.000048098176,"about_ca_topic_score_gemma":0.000018234086,"teacher_disagreement_score":0.8663466,"about_ca_system_score_codex":0.0008167595,"about_ca_system_score_gemma":0.00051832566,"threshold_uncertainty_score":0.9995532},"labels":[],"label_agreement":null},{"id":"W3215510528","doi":"10.1111/poms.13624","title":"Why do Energy Markets in Europe Rely on One Instrument?","year":2021,"lang":"en","type":"article","venue":"Production and Operations Management","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Futures contract; Spot contract; Electricity; Forward contract; Normal backwardation; Forward market; Microeconomics; Derivative (finance); Business; Economics; Spot market; Variance (accounting); Hedge; Industrial organization; Financial economics","score_opus":0.007990211478247826,"score_gpt":0.18141755774295096,"score_spread":0.17342734626470313,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3215510528","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20197408,0.0061010863,0.21586044,0.042325053,0.008421675,0.0026811298,0.000011935073,0.0017125544,0.52091205],"genre_scores_gemma":[0.9848751,0.0039778594,0.004110363,0.00044082757,0.000089206624,0.000097853765,0.000036529742,0.00002540736,0.006346872],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99934876,0.00004999506,0.00016592446,0.00022353644,0.0001071993,0.00010460539],"domain_scores_gemma":[0.9997165,0.000003383998,0.000009049492,0.00018882273,0.00005767556,0.000024518473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011124509,0.000081647835,0.000073312796,0.00016896454,0.0000647109,0.00008932511,0.000034750974,0.000020535848,0.000052644376],"category_scores_gemma":[0.000030064184,0.00009265016,0.000007839594,0.00064474426,0.000006180333,0.00015393466,0.000023850504,0.000053675314,0.00001156467],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025261706,0.00036538971,0.00031048848,0.00023742212,0.0001601733,0.000033033393,0.00038109758,0.7982106,0.002002392,0.081476174,0.047702905,0.06909505],"study_design_scores_gemma":[0.0015221024,0.00012944733,0.010057235,0.0005300912,0.000087859065,0.00005057353,0.00038287396,0.23566306,0.026039135,0.00022792806,0.7243745,0.0009352077],"about_ca_topic_score_codex":0.00000736655,"about_ca_topic_score_gemma":0.00009424541,"teacher_disagreement_score":0.782901,"about_ca_system_score_codex":0.000066562156,"about_ca_system_score_gemma":0.000006302945,"threshold_uncertainty_score":0.3778164},"labels":[],"label_agreement":null},{"id":"W3216244546","doi":"","title":"Eléctrica pública: ¿una utopía?","year":2021,"lang":"es","type":"article","venue":"Alternativas económicas/Alternativas económicas","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Political science; Humanities; Art","score_opus":0.01036479955149681,"score_gpt":0.24857700956125192,"score_spread":0.23821221000975512,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3216244546","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5979372,0.01806401,0.029936066,0.0054465504,0.009171135,0.0029184488,0.001030586,0.0027248058,0.33277115],"genre_scores_gemma":[0.96647626,0.009576324,0.004298196,0.00077927794,0.0034083498,0.0002654155,0.0004214495,0.00078087224,0.013993834],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.98807126,0.0008251492,0.0035526433,0.0032416077,0.0013536029,0.0029557182],"domain_scores_gemma":[0.99170804,0.0013784162,0.0014994097,0.0032550239,0.0009194423,0.001239674],"candidate_categories":["metaepi_narrow","scholarly_communication","insufficient_payload"],"consensus_categories":["metaepi_narrow","insufficient_payload"],"category_scores_codex":[0.0009410798,0.0022571215,0.0027039566,0.0014254041,0.00053864974,0.001845589,0.002732737,0.00097432476,0.006199279],"category_scores_gemma":[0.00088910194,0.0026783007,0.0011695689,0.0021653767,0.00031105205,0.0020398868,0.0009771084,0.002046972,0.005187548],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007114447,0.0062161107,0.05282923,0.0055875275,0.028501792,0.015358448,0.006357342,0.08734143,0.13115734,0.46510795,0.08802306,0.112808354],"study_design_scores_gemma":[0.008958244,0.00072473404,0.0036369774,0.0025051623,0.0009200092,0.0035263966,0.00028425048,0.18260528,0.30747703,0.0068159625,0.47565177,0.006894194],"about_ca_topic_score_codex":0.0003794241,"about_ca_topic_score_gemma":0.00005494198,"teacher_disagreement_score":0.45829198,"about_ca_system_score_codex":0.0021275452,"about_ca_system_score_gemma":0.0007437394,"threshold_uncertainty_score":0.99919057},"labels":[],"label_agreement":null},{"id":"W328099773","doi":"10.15173/esr.v21i1.2530","title":"PRICE CONVERGENCE AND INTEGRATION IN THE GERMANY, FRANCE AND ITALY ELECTRICITY MARKETS","year":2015,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cointegration; Convergence (economics); Economics; Electricity; Market integration; Electricity market; Econometrics; Empirical evidence; Electricity price; Macroeconomics; Economy; Financial economics; Engineering","score_opus":0.018165888250974146,"score_gpt":0.24934275530980216,"score_spread":0.231176867058828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W328099773","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004061315,0.9842316,0.007583814,0.0003181601,0.00013704515,0.00019694788,4.975894e-7,0.000045144392,0.003425497],"genre_scores_gemma":[0.48921362,0.5101624,0.0001319789,0.0003098899,0.000018935692,0.00006738303,0.0000013030387,0.000006915655,0.00008756945],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99933505,0.00011233177,0.00020338975,0.00011899503,0.00011013484,0.00012012063],"domain_scores_gemma":[0.99966997,0.00009765271,0.000038887152,0.00011136633,0.000057480618,0.000024617611],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005136677,0.00010714312,0.00021936887,0.00003369846,0.000029281722,0.000011517396,0.00007105506,0.000020018064,0.0000016337041],"category_scores_gemma":[0.00019980784,0.00007363531,0.000010707851,0.00040752007,0.000021312911,0.00011070569,0.000020295845,0.00006828299,0.000001534893],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005254836,0.00018892555,0.007898362,0.015928544,0.0007976302,0.00009241179,0.011179529,0.0035918877,0.00044232752,0.023438234,0.22477658,0.711613],"study_design_scores_gemma":[0.0023480114,0.0006587214,0.0406246,0.010981068,0.00039433208,0.00038837633,0.0008599963,0.17395084,0.00077460974,0.0014998561,0.76532537,0.002194207],"about_ca_topic_score_codex":0.000014658671,"about_ca_topic_score_gemma":0.000032289583,"teacher_disagreement_score":0.70941883,"about_ca_system_score_codex":0.00004249417,"about_ca_system_score_gemma":0.000007216763,"threshold_uncertainty_score":0.30027607},"labels":[],"label_agreement":null},{"id":"W35495929","doi":"10.15173/esr.v14i2.495","title":"The Liberalisation of the Continental European Electricity Market - Lessons Learned","year":2006,"lang":"en","type":"article","venue":"Energy Studies Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Liberalization; Competition (biology); Electricity market; Electricity; Margin (machine learning); Economics; Business; Mains electricity; International economics; Market economy; Industrial organization; Natural resource economics; Engineering; Computer science","score_opus":0.021071438727416077,"score_gpt":0.24992333497783992,"score_spread":0.22885189625042385,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W35495929","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005773791,0.8881151,0.0023320797,0.0030970157,0.00055887667,0.0003036011,0.000004108717,0.00016306338,0.104848795],"genre_scores_gemma":[0.5265031,0.46793568,0.000060635033,0.00019009692,0.00012463296,0.000042074043,0.0000069937932,0.000037776106,0.005099021],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989058,0.0003291035,0.00035542375,0.00009996716,0.0001521269,0.00015760129],"domain_scores_gemma":[0.9994133,0.00013197419,0.00012445393,0.00024670138,0.00007332053,0.000010245151],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048258936,0.00011730364,0.00022581454,0.000016850112,0.00015317669,0.000011923201,0.00018831498,0.000015629144,0.000007576909],"category_scores_gemma":[0.00012860143,0.00006643742,0.000091485635,0.00041819108,0.000041345756,0.000042062416,0.00004436674,0.000067542096,0.0000027281212],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008262937,0.000047179976,0.00042199742,0.0017720372,0.00057848886,0.0000028869588,0.00013556176,0.011183514,0.0005939155,0.021334112,0.7984952,0.16542688],"study_design_scores_gemma":[0.00025733528,0.000022963222,0.004052519,0.0011695798,0.00015232185,0.000008914635,0.00001962334,0.004213153,0.0014677893,0.00027271354,0.98811764,0.00024546296],"about_ca_topic_score_codex":0.000034766414,"about_ca_topic_score_gemma":0.00009015525,"teacher_disagreement_score":0.5259257,"about_ca_system_score_codex":0.00006564066,"about_ca_system_score_gemma":0.000007551972,"threshold_uncertainty_score":0.27092394},"labels":[],"label_agreement":null},{"id":"W381998577","doi":"","title":"Expansión de las Redes de Transmisión Eléctrica en Norteamérica: Teoría y Aplicaciones [The Expansion of Electricity Networks in North America: Theory and Applications]","year":2010,"lang":"es","type":"article","venue":"MPRA Paper","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electric power transmission; Tariff; Electricity; Grid; Transmission network; Electric power system; Electric power; Welfare economics; Topology (electrical circuits); Transmission (telecommunications); Computer science; Electrical engineering; Telecommunications; Business; Power (physics); Economics; Geography; Engineering; Physics","score_opus":0.0023402236827680892,"score_gpt":0.19779018148525632,"score_spread":0.19544995780248822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W381998577","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.56559676,0.0057962677,0.4250519,0.00033066663,0.00012426713,0.0013689357,0.000018934299,0.00019634957,0.001515919],"genre_scores_gemma":[0.99265933,0.0041002166,0.002253566,0.0001540626,0.00026380038,0.00040213775,0.000023235714,0.00008895908,0.000054714175],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9972669,0.00052333577,0.0007259206,0.00048803363,0.00027767074,0.00071814837],"domain_scores_gemma":[0.997496,0.0013285727,0.0002205318,0.00068802445,0.000103696504,0.00016317204],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00094234984,0.00040365526,0.0005316721,0.0002908271,0.00017268454,0.00007256763,0.0004492902,0.00041829632,0.00003850675],"category_scores_gemma":[0.00021285033,0.0003524221,0.00011128603,0.0019029116,0.00015394493,0.00022724003,0.000048957223,0.0010206004,0.00000831659],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000519579,0.0007489339,0.11010617,0.00096197514,0.0005208262,0.000026829528,0.009279382,0.288646,0.19989954,0.021698501,0.0007761474,0.3668161],"study_design_scores_gemma":[0.0026999626,0.00053622446,0.5880166,0.00031650925,0.00073006435,0.00022553351,0.0008726857,0.35227975,0.010056708,0.0016780284,0.040427502,0.0021603762],"about_ca_topic_score_codex":0.00024545912,"about_ca_topic_score_gemma":0.0002677592,"teacher_disagreement_score":0.47791046,"about_ca_system_score_codex":0.00015276068,"about_ca_system_score_gemma":0.00014172692,"threshold_uncertainty_score":0.9998928},"labels":[],"label_agreement":null},{"id":"W4205956847","doi":"10.1109/pesgm46819.2021.9638073","title":"Operation of a CAES Facility Under Price Uncertainties Using Robust Optimization","year":2021,"lang":"en","type":"article","venue":"2021 IEEE Power &amp; Energy Society General Meeting (PESGM)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Schedule; Monte Carlo method; Robust optimization; Computer science; Electricity price; Compressed air energy storage; Electricity; Mathematical optimization; Spinning; Energy storage; Engineering; Mathematics; Power (physics); Statistics","score_opus":0.023222494058090903,"score_gpt":0.228432942330787,"score_spread":0.2052104482726961,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4205956847","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1226255,0.001995868,0.872276,0.00008488272,0.0012681873,0.00012755777,0.000035387406,0.00020396044,0.0013826763],"genre_scores_gemma":[0.6919401,0.0010236152,0.3033355,0.00022068985,0.00040573234,0.000041654584,0.00059932534,0.00013266673,0.0023006974],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972391,0.00028714622,0.0008401846,0.00055947475,0.00052631367,0.0005477853],"domain_scores_gemma":[0.99840176,0.00010401863,0.00022301576,0.0005406333,0.0006086342,0.00012196587],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005763486,0.0004093282,0.0005067907,0.00008841108,0.00026075201,0.00012157111,0.00020984269,0.000347771,0.00022575019],"category_scores_gemma":[0.00012222145,0.000464399,0.00030971484,0.0009815522,0.00006819686,0.0003584919,0.000069543785,0.00023212646,0.0000070696947],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000054406714,0.00004443774,0.00012758434,0.00009205844,0.00020315858,0.0000011794215,0.0011227633,0.9253268,0.07077722,0.000112568385,0.002095634,0.0000911436],"study_design_scores_gemma":[0.00038977322,0.000015935779,0.000016395554,0.00011206844,0.00007514416,0.00001662173,0.000410991,0.9519094,0.044141665,0.00002326663,0.0023724902,0.00051624776],"about_ca_topic_score_codex":0.00042668276,"about_ca_topic_score_gemma":0.00023693441,"teacher_disagreement_score":0.5693146,"about_ca_system_score_codex":0.00054209866,"about_ca_system_score_gemma":0.00024360642,"threshold_uncertainty_score":0.9997808},"labels":[],"label_agreement":null},{"id":"W4207012948","doi":"10.1049/gtd2.12404","title":"A sequential hybridization of ETLBO and IPSO for solving reserve‐constrained combined heat, power and economic dispatch problem","year":2022,"lang":"en","type":"article","venue":"IET Generation Transmission & Distribution","topic":"Electric Power System Optimization","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Mathematical optimization; Economic dispatch; Computer science; Particle swarm optimization; Optimization problem; Metaheuristic; Constraint (computer-aided design); Process (computing); Electric power system; Power (physics); Engineering; Mathematics","score_opus":0.009313522383580705,"score_gpt":0.21082551241603595,"score_spread":0.20151199003245523,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4207012948","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35190868,0.0003755596,0.64603156,0.00023972699,0.00019174577,0.0006917,0.00042000733,0.000099570636,0.00004142845],"genre_scores_gemma":[0.9946251,0.00011654441,0.0020046183,0.000010323478,0.00003976227,0.00018009797,0.0029660878,0.000027593951,0.000029855528],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99885046,0.000076572665,0.00046386762,0.0002628421,0.00015502247,0.0001912229],"domain_scores_gemma":[0.9996167,0.00003590904,0.000075780605,0.00011915676,0.000073202275,0.00007928695],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039506378,0.00015951031,0.00020573253,0.000069801245,0.00029559148,0.00004384968,0.000062395775,0.00007182432,0.00005723366],"category_scores_gemma":[0.0000128078445,0.00018349693,0.000051050112,0.00015313826,0.000027093405,0.00024308986,0.000017609414,0.00009117055,3.9062746e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017476319,0.000079068406,0.0006362757,0.00033577002,0.00008057541,0.0000010524043,0.00045894383,0.5696265,0.41555882,0.004758709,0.0044017574,0.003887738],"study_design_scores_gemma":[0.0015606815,0.00026037957,0.00034079576,0.000030958272,0.000044510485,0.000014059731,0.000044888187,0.92076665,0.07445657,0.00021999654,0.0020414996,0.0002189817],"about_ca_topic_score_codex":0.000029124354,"about_ca_topic_score_gemma":0.000014567554,"teacher_disagreement_score":0.64402694,"about_ca_system_score_codex":0.00019339597,"about_ca_system_score_gemma":0.0000702153,"threshold_uncertainty_score":0.74827874},"labels":[],"label_agreement":null},{"id":"W4210254026","doi":"10.1016/j.tej.2022.107080","title":"Does dynamic pricing work in a winter-peaking climate? A case study of Hydro Quebec","year":2022,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec; Desjardins","funders":"","keywords":"Work (physics); Environmental science; Hydro power; Hydroelectricity; Climate change; Economics; Meteorology; Geography; Engineering; Water resource management; Oceanography; Geology; Electrical engineering","score_opus":0.005218323653306488,"score_gpt":0.21522961050368727,"score_spread":0.21001128685038079,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210254026","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9906868,0.00042051045,0.007832327,0.000040320854,0.0004027478,0.00041961414,0.0000010664903,0.00007933863,0.00011729708],"genre_scores_gemma":[0.9997334,0.000029210005,0.00007129943,0.000012275557,0.000043679698,0.000029146162,5.1109885e-7,0.000037797457,0.00004271743],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979951,0.0004353012,0.00061148487,0.00013893873,0.00037190513,0.0004472725],"domain_scores_gemma":[0.9993062,0.00017055962,0.00022001262,0.00022098729,0.000039661878,0.000042569867],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013922903,0.00016269744,0.0002831848,0.00048534115,0.00036532278,0.000062058636,0.00034284053,0.000030012661,0.000032322303],"category_scores_gemma":[0.000042502077,0.000107544874,0.000063769265,0.0019030948,0.000009897553,0.00013915871,0.000084470084,0.0009749011,0.000001054008],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010937848,0.00035121985,0.01454538,0.000040285002,0.00015120149,0.0019672713,0.020595629,0.9532728,0.0013447423,0.000007851229,0.000076652446,0.0075375955],"study_design_scores_gemma":[0.0028579542,0.00096842175,0.006651565,0.00016872754,0.00016898954,0.020324219,0.020090051,0.9473903,0.0005594752,0.00009503324,0.00008545647,0.0006397968],"about_ca_topic_score_codex":0.00133912,"about_ca_topic_score_gemma":0.0058141206,"teacher_disagreement_score":0.01835695,"about_ca_system_score_codex":0.00096529874,"about_ca_system_score_gemma":0.000054132455,"threshold_uncertainty_score":0.43855527},"labels":[],"label_agreement":null},{"id":"W4213335749","doi":"10.5547/01956574.43.5.sdeb","title":"Reciprocal Dumping under Dichotomous Regulation","year":2022,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal","funders":"","keywords":"Inefficiency; Economics; Microeconomics; Subgame perfect equilibrium; Nash equilibrium; Scarcity; Outcome (game theory); Pareto principle; Subgame; Industrial organization; Best response","score_opus":0.00581100140378099,"score_gpt":0.17392379213052422,"score_spread":0.16811279072674323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4213335749","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03680383,0.0014029485,0.9464709,0.0005529393,0.002149547,0.000068916015,9.460474e-7,0.00026520193,0.012284743],"genre_scores_gemma":[0.9984879,0.00004515264,0.00019850196,0.00011089347,0.00029005526,0.000014508243,0.0000034677328,0.000028005667,0.0008215139],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918973,0.00012449546,0.00018971824,0.00006009684,0.00026371013,0.00017224788],"domain_scores_gemma":[0.999724,0.00003122776,0.00005662207,0.00012566807,0.000023510487,0.000038977294],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038478072,0.0000735365,0.00007368685,0.00008723972,0.00042979402,0.00004733487,0.00018133965,0.000022273594,0.00022770172],"category_scores_gemma":[0.00000786877,0.00005942465,0.000039293132,0.00027662958,0.000008484976,0.00009418674,0.000029929875,0.00027026903,0.0000037025595],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000063017487,0.0000046063337,0.0000148196405,0.0000012715697,0.000026274138,0.0000043911614,0.00014984766,0.990567,0.0014703088,0.0016944265,0.0032136692,0.0028470454],"study_design_scores_gemma":[0.0005471405,0.00008001154,0.00075063703,0.000018590641,0.000033619588,0.0023596336,0.00027479182,0.95120317,0.002702698,0.0061591226,0.035596292,0.00027429522],"about_ca_topic_score_codex":0.000007751521,"about_ca_topic_score_gemma":0.000004289979,"teacher_disagreement_score":0.96168405,"about_ca_system_score_codex":0.00027707097,"about_ca_system_score_gemma":0.00002500319,"threshold_uncertainty_score":0.33056715},"labels":[],"label_agreement":null},{"id":"W4213457847","doi":"10.3390/su14052586","title":"A Cost-Effective Solution for Non-Convex Economic Load Dispatch Problems in Power Systems Using Slime Mould Algorithm","year":2022,"lang":"en","type":"article","venue":"Sustainability","topic":"Electric Power System Optimization","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Taif University","keywords":"Heuristic; Mathematical optimization; Economic dispatch; Electric power system; Regular polygon; Power (physics); Algorithm; Computer science; Electric power; SMA*; Mathematics","score_opus":0.009602637968026432,"score_gpt":0.2476682963867971,"score_spread":0.23806565841877067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4213457847","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1539895,0.0004010208,0.8308606,0.00005620921,0.0011997632,0.0130361365,0.00009222238,0.00023650122,0.00012801349],"genre_scores_gemma":[0.9925978,0.0000021803148,0.00068053254,0.0000058508617,0.000035321613,0.0065161716,0.000029900206,0.000057567162,0.00007467208],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980923,0.00019453769,0.0004886661,0.00043499874,0.00018773382,0.00060177664],"domain_scores_gemma":[0.99906886,0.00014951552,0.00009660162,0.00036331234,0.00025075692,0.00007092969],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0014351747,0.00023252572,0.00038451023,0.00019037384,0.00018100571,0.00005420034,0.00017906778,0.00011305502,0.000016524356],"category_scores_gemma":[0.00011988135,0.00028248574,0.000094205854,0.0003840592,0.000029681656,0.00027790852,0.00009045592,0.0002851962,0.0000023083676],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026871192,0.000068228284,0.0042763897,0.0006140994,0.000036605885,0.0000027668505,0.0013724811,0.9905239,0.00012269024,0.00006502348,0.00015737122,0.0027335875],"study_design_scores_gemma":[0.00085836626,0.00013808996,0.0013087537,0.000018163619,0.000016762344,0.000010343677,0.0007511362,0.99509037,0.000078084835,0.00036156984,0.0010793541,0.00028899912],"about_ca_topic_score_codex":0.0015266496,"about_ca_topic_score_gemma":0.0000799037,"teacher_disagreement_score":0.8386083,"about_ca_system_score_codex":0.02241681,"about_ca_system_score_gemma":0.00048923545,"threshold_uncertainty_score":0.99996275},"labels":[],"label_agreement":null},{"id":"W4226181057","doi":"10.26686/wgtn.16993156","title":"Essays on the Interaction Between Risk and Market Structure in Electricity Markets","year":2011,"lang":"en","type":"dissertation","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Victoria University; Institute of Circulatory and Respiratory Health; Victoria University of Wellington","keywords":"Spot contract; Hedge; Forward contract; Electricity market; Spot market; Economics; Market power; Microeconomics; Electricity; Oligopoly; Supply and demand; Market structure; Financial economics; Cournot competition; Futures contract","score_opus":0.005767400637007257,"score_gpt":0.2053172188057479,"score_spread":0.19954981816874065,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226181057","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6589868,0.0004359849,0.0017144523,0.000008838226,0.00089172146,0.0008163272,0.000042472348,0.00025951397,0.33684388],"genre_scores_gemma":[0.9964405,0.0005013491,0.00009081349,0.000008792295,0.00007727687,0.000045717563,0.00020763166,0.00006404323,0.0025638798],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9988509,0.00016860907,0.00032656512,0.0002556321,0.00016865223,0.00022963049],"domain_scores_gemma":[0.99925363,0.00030637087,0.00013000194,0.00023340384,0.000038881994,0.000037723425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029192504,0.0002943522,0.00027885995,0.0003417958,0.000055387864,0.000052250638,0.00015329584,0.00037719545,0.0005342785],"category_scores_gemma":[0.00010838514,0.00022294107,0.00003846748,0.0003771311,0.0000053604795,0.00011543002,0.0000070552996,0.0008115478,0.0000079602905],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002359831,0.0002374215,0.19617987,0.0040788925,0.0027445501,0.000048146943,0.009756418,0.010588025,0.0014187561,0.005986613,0.17970394,0.58689755],"study_design_scores_gemma":[0.0012620765,0.0002605336,0.8032088,0.0010606822,0.0004379107,0.000018245466,0.000737742,0.16595693,0.01677205,0.004888891,0.003182689,0.0022134397],"about_ca_topic_score_codex":0.00017284106,"about_ca_topic_score_gemma":0.00080214825,"teacher_disagreement_score":0.60702896,"about_ca_system_score_codex":0.00015804422,"about_ca_system_score_gemma":0.000018047149,"threshold_uncertainty_score":0.90912735},"labels":[],"label_agreement":null},{"id":"W4226185857","doi":"10.26686/wgtn.16993156.v1","title":"Essays on the Interaction  Between Risk and Market  Structure in Electricity  Markets","year":2011,"lang":"en","type":"dissertation","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Victoria University; Institute of Circulatory and Respiratory Health; Victoria University of Wellington","keywords":"Spot contract; Hedge; Forward contract; Electricity market; Spot market; Economics; Market power; Microeconomics; Electricity; Oligopoly; Supply and demand; Market structure; Financial economics; Cournot competition; Futures contract","score_opus":0.005767400637007257,"score_gpt":0.2053172188057479,"score_spread":0.19954981816874065,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226185857","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6589868,0.0004359849,0.0017144523,0.000008838226,0.00089172146,0.0008163272,0.000042472348,0.00025951397,0.33684388],"genre_scores_gemma":[0.9964405,0.0005013491,0.00009081349,0.000008792295,0.00007727687,0.000045717563,0.00020763166,0.00006404323,0.0025638798],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9988509,0.00016860907,0.00032656512,0.0002556321,0.00016865223,0.00022963049],"domain_scores_gemma":[0.99925363,0.00030637087,0.00013000194,0.00023340384,0.000038881994,0.000037723425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029192504,0.0002943522,0.00027885995,0.0003417958,0.000055387864,0.000052250638,0.00015329584,0.00037719545,0.0005342785],"category_scores_gemma":[0.00010838514,0.00022294107,0.00003846748,0.0003771311,0.0000053604795,0.00011543002,0.0000070552996,0.0008115478,0.0000079602905],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002359831,0.0002374215,0.19617987,0.0040788925,0.0027445501,0.000048146943,0.009756418,0.010588025,0.0014187561,0.005986613,0.17970394,0.58689755],"study_design_scores_gemma":[0.0012620765,0.0002605336,0.8032088,0.0010606822,0.0004379107,0.000018245466,0.000737742,0.16595693,0.01677205,0.004888891,0.003182689,0.0022134397],"about_ca_topic_score_codex":0.00017284106,"about_ca_topic_score_gemma":0.00080214825,"teacher_disagreement_score":0.60702896,"about_ca_system_score_codex":0.00015804422,"about_ca_system_score_gemma":0.000018047149,"threshold_uncertainty_score":0.90912735},"labels":[],"label_agreement":null},{"id":"W4230243395","doi":"10.52549/ijeei.v7i4.1336","title":"Assessment of Different Strategies in Optimizing Network Operation Incorporating PV System","year":2019,"lang":"en","type":"article","venue":"Indonesian Journal of Electrical Engineering and Informatics (IJEEI)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"Universiti Teknologi Brunei","keywords":"Dispatchable generation; Software deployment; Renewable energy; Weighting; Distributed generation; Engineering; Reliability engineering; Photovoltaic system; Computer science; Mathematical optimization; Electrical engineering","score_opus":0.0029817879408428226,"score_gpt":0.18711169164257013,"score_spread":0.1841299037017273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230243395","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.51179713,0.00035149747,0.4861629,0.000004836453,0.00031569958,0.00020406028,6.2857464e-7,0.000051561656,0.0011116738],"genre_scores_gemma":[0.98034024,0.000071909366,0.019477954,0.0000033946085,0.00007246472,0.000004429149,0.000002968922,0.000024789168,0.0000018187012],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99792933,0.00003373412,0.0013769461,0.000060924333,0.00030997215,0.00028906696],"domain_scores_gemma":[0.99920464,0.00011856833,0.00036843435,0.000118316275,0.0000977966,0.000092268965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055902073,0.00020626606,0.00054423,0.0004480721,0.000024920964,0.00010239906,0.00014944328,0.00012292615,0.0000018276755],"category_scores_gemma":[0.000022197526,0.00018304668,0.00006209199,0.0005326832,0.000008098537,0.00067821116,0.000018618312,0.0004504515,6.829158e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000063904627,0.000012060302,0.0034799543,0.00054589345,0.000046276557,0.0000039044576,0.00022657879,0.9894332,0.0012438996,0.0045145317,0.000008821284,0.0004784589],"study_design_scores_gemma":[0.00068352016,0.00025240265,0.004391918,0.00058630295,0.000018271683,0.000112556874,0.0002469536,0.9930875,0.0004278239,0.000013791325,0.0000058411156,0.0001731663],"about_ca_topic_score_codex":0.0000016290444,"about_ca_topic_score_gemma":4.9060475e-7,"teacher_disagreement_score":0.4685431,"about_ca_system_score_codex":0.00025164356,"about_ca_system_score_gemma":0.00008118027,"threshold_uncertainty_score":0.74644274},"labels":[],"label_agreement":null},{"id":"W4232112611","doi":"10.32920/ryerson.14648058.v1","title":"Unit commitment using complementarity","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University; Toronto Metropolitan University","funders":"","keywords":"Mathematical optimization; Power system simulation; Complementarity (molecular biology); Computer science; Nonlinear system; Complementarity theory; Linear programming; Generator (circuit theory); Economic dispatch; Integer programming; Grid; Integer (computer science); Power (physics); Mathematics; Electric power system","score_opus":0.05794564141867547,"score_gpt":0.2770386808553337,"score_spread":0.2190930394366582,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4232112611","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.085913226,0.00093332503,0.88522243,0.000032260326,0.002034924,0.00057106256,0.000026415433,0.00074845896,0.02451787],"genre_scores_gemma":[0.9502709,0.00006116675,0.048903808,0.000046687208,0.00007630249,0.000022435472,0.00044395297,0.00005062241,0.00012411166],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990487,0.00005030941,0.0003055303,0.00020584777,0.00017887761,0.00021075286],"domain_scores_gemma":[0.9993868,0.000019755005,0.000042582524,0.00042980546,0.00006673072,0.000054359964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012019166,0.00021153102,0.00027429665,0.00008871621,0.000040250965,0.00011520265,0.0001783865,0.00014328914,0.0005796666],"category_scores_gemma":[0.000004160357,0.00024382955,0.00006705481,0.00013715001,0.0000069310954,0.000046080713,0.00027874904,0.0003368552,0.000008796333],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.9689575e-7,0.000024936246,0.0014742477,0.00032874534,0.00020708654,0.000009707567,0.00016704363,0.99543697,0.00026539207,0.00018921627,0.0015671228,0.00032892314],"study_design_scores_gemma":[0.00015975976,0.000005349154,0.0003075744,0.00013252452,0.00005508749,0.0000077500345,0.000097419885,0.995188,0.0020370136,0.000046546025,0.0016385509,0.00032439866],"about_ca_topic_score_codex":0.00057301833,"about_ca_topic_score_gemma":0.00032081865,"teacher_disagreement_score":0.8643577,"about_ca_system_score_codex":0.0003891746,"about_ca_system_score_gemma":0.000060639653,"threshold_uncertainty_score":0.99430805},"labels":[],"label_agreement":null},{"id":"W4232668127","doi":"10.1109/access.2017.2768522","title":"Solution of an Economic Dispatch Problem Through Particle Swarm Optimization: A Detailed Survey – Part II","year":2017,"lang":"en","type":"article","venue":"IEEE Access","topic":"Electric Power System Optimization","field":"Engineering","cited_by":72,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Particle swarm optimization; Mathematical optimization; Premature convergence; Convergence (economics); Computer science; Optimization problem; Multi-swarm optimization; Economic dispatch; Metaheuristic; Mathematics; Electric power system","score_opus":0.0379337132394792,"score_gpt":0.28847660033494227,"score_spread":0.2505428870954631,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4232668127","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7411565,0.000079952275,0.25548407,0.000044632987,0.00092665263,0.00037487908,0.000030716303,0.00019628627,0.0017062784],"genre_scores_gemma":[0.99678195,0.00007195779,0.0028087273,0.0000075831563,0.00010802933,0.000048339505,0.000045766177,0.000040395662,0.00008728323],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99892163,0.000070737544,0.00039038036,0.00022704665,0.00011769757,0.00027249794],"domain_scores_gemma":[0.99894214,0.000031747262,0.00021564223,0.00066260225,0.000083583815,0.00006426019],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035961834,0.00015143247,0.00024170055,0.00003262638,0.00026942516,0.00020670936,0.0005889298,0.00009388138,0.000056420995],"category_scores_gemma":[0.000033386863,0.00016170516,0.000037354443,0.000094666226,0.000038377264,0.002107775,0.00006362702,0.000071861316,0.00001653427],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014659828,0.000037456062,0.023843585,0.000042818767,0.000036113895,8.812719e-7,0.00014809414,0.9745444,0.00016213206,0.000042870728,0.0007789314,0.00034805428],"study_design_scores_gemma":[0.00052197144,0.00005669888,0.013231656,0.000035820645,0.000022304022,0.0000027117144,0.000003186447,0.95685685,0.02887605,0.00006861878,0.000105173385,0.00021894553],"about_ca_topic_score_codex":0.0005900116,"about_ca_topic_score_gemma":0.0017627785,"teacher_disagreement_score":0.25562537,"about_ca_system_score_codex":0.000107131316,"about_ca_system_score_gemma":0.000043167172,"threshold_uncertainty_score":0.6594145},"labels":[],"label_agreement":null},{"id":"W4233924219","doi":"10.32920/ryerson.14663373.v1","title":"Techno-economic models for integration of wind energy.","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Probabilistic logic; Wind speed; Electric power system; Computer science; Induction generator; Electricity generation; Control theory (sociology); Power (physics); Engineering; Electrical engineering; Meteorology","score_opus":0.012192574526919865,"score_gpt":0.20543327907608971,"score_spread":0.19324070454916986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4233924219","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030474055,0.0005640817,0.9832425,0.000013605689,0.0006196145,0.00026317118,0.000022382977,0.00025357198,0.011973648],"genre_scores_gemma":[0.96205497,0.00017545641,0.036844537,0.0000047607755,0.000058292295,0.00009341175,0.00027260257,0.000048287016,0.00044771112],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992436,0.000008174633,0.0003674629,0.00020395678,0.00005968654,0.00011708664],"domain_scores_gemma":[0.99946225,0.000028223427,0.00008147195,0.00032982157,0.000077041106,0.000021165864],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008911472,0.00016404192,0.00029017363,0.00016333716,0.000009668872,0.000035109337,0.00015183297,0.00030519278,0.000026228414],"category_scores_gemma":[0.000008451524,0.00017879976,0.00010274693,0.0000620285,0.0000060489438,0.000102199345,0.000056646997,0.00011205899,7.742979e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014969798,0.00000489154,0.0000011193351,0.000158262,0.00005669015,1.08429255e-7,0.000054861997,0.9886578,0.0014754662,0.0062667252,0.00044237843,0.0028802024],"study_design_scores_gemma":[0.00008881095,0.000009233531,0.0000010054966,0.00010221795,0.000021349428,0.0000011939547,0.000026025977,0.94289565,0.05446748,0.002156016,0.00008003565,0.00015099204],"about_ca_topic_score_codex":0.00019312995,"about_ca_topic_score_gemma":0.00011725772,"teacher_disagreement_score":0.95900756,"about_ca_system_score_codex":0.00022898214,"about_ca_system_score_gemma":0.00007869627,"threshold_uncertainty_score":0.7291243},"labels":[],"label_agreement":null},{"id":"W4236317477","doi":"10.1049/oap-cired.2021.0187","title":"Flexibility platform for community energy systems","year":2020,"lang":"en","type":"article","venue":"CIRED - Open Access Proceedings Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Flexibility (engineering); Exploit; Sustainability; Renewable energy; Computer science; Environmental economics; Risk analysis (engineering); Business; Computer security; Engineering; Economics","score_opus":0.13380911455319786,"score_gpt":0.33821556656283164,"score_spread":0.20440645200963378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236317477","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23881383,0.0029780495,0.6474849,0.0013384116,0.0039877505,0.0040686764,0.00008169731,0.001623222,0.09962347],"genre_scores_gemma":[0.99813795,0.00008666962,0.0008445305,0.00019707008,0.00044216847,0.000121864825,0.0000144171345,0.00007174488,0.000083567924],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984539,0.000023332273,0.0006535477,0.00019535072,0.00026186026,0.000412],"domain_scores_gemma":[0.99873066,0.00007604919,0.00026522527,0.00013656415,0.00045360907,0.00033791218],"candidate_categories":["scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0009787818,0.00023723266,0.0004295525,0.00010793968,0.00056803937,0.0040056854,0.0026291884,0.00013890253,0.000031378524],"category_scores_gemma":[0.00030237902,0.00023236389,0.0000847911,0.00057787076,0.000024152634,0.004563969,0.00039226472,0.00057380606,0.000004408191],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014115699,0.00051104184,0.009827441,0.0074758464,0.0017995354,0.000033375065,0.014973716,0.26618668,0.013692246,0.024038397,0.6024307,0.057619482],"study_design_scores_gemma":[0.0025422494,0.00033205395,0.00042398775,0.00033020665,0.00009347093,0.000353294,0.0016588512,0.9619917,0.0066053076,0.002393812,0.022470705,0.00080431945],"about_ca_topic_score_codex":0.00008592419,"about_ca_topic_score_gemma":0.000005986272,"teacher_disagreement_score":0.75932413,"about_ca_system_score_codex":0.0002912116,"about_ca_system_score_gemma":0.000087944296,"threshold_uncertainty_score":0.99702823},"labels":[],"label_agreement":null},{"id":"W4236343770","doi":"10.32920/ryerson.14663373","title":"Techno-economic models for integration of wind energy.","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Probabilistic logic; Wind speed; Electric power system; Computer science; Induction generator; Electricity generation; Control theory (sociology); Power (physics); Engineering; Electrical engineering","score_opus":0.012192574526919865,"score_gpt":0.20543327907608971,"score_spread":0.19324070454916986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236343770","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030474055,0.0005640817,0.9832425,0.000013605689,0.0006196145,0.00026317118,0.000022382977,0.00025357198,0.011973648],"genre_scores_gemma":[0.96205497,0.00017545641,0.036844537,0.0000047607755,0.000058292295,0.00009341175,0.00027260257,0.000048287016,0.00044771112],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992436,0.000008174633,0.0003674629,0.00020395678,0.00005968654,0.00011708664],"domain_scores_gemma":[0.99946225,0.000028223427,0.00008147195,0.00032982157,0.000077041106,0.000021165864],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008911472,0.00016404192,0.00029017363,0.00016333716,0.000009668872,0.000035109337,0.00015183297,0.00030519278,0.000026228414],"category_scores_gemma":[0.000008451524,0.00017879976,0.00010274693,0.0000620285,0.0000060489438,0.000102199345,0.000056646997,0.00011205899,7.742979e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014969798,0.00000489154,0.0000011193351,0.000158262,0.00005669015,1.08429255e-7,0.000054861997,0.9886578,0.0014754662,0.0062667252,0.00044237843,0.0028802024],"study_design_scores_gemma":[0.00008881095,0.000009233531,0.0000010054966,0.00010221795,0.000021349428,0.0000011939547,0.000026025977,0.94289565,0.05446748,0.002156016,0.00008003565,0.00015099204],"about_ca_topic_score_codex":0.00019312995,"about_ca_topic_score_gemma":0.00011725772,"teacher_disagreement_score":0.95900756,"about_ca_system_score_codex":0.00022898214,"about_ca_system_score_gemma":0.00007869627,"threshold_uncertainty_score":0.7291243},"labels":[],"label_agreement":null},{"id":"W4236816715","doi":"10.1109/pesgm46819.2021.9638223","title":"Integrating Net Benefits Test for Demand Response into Optimal Power Flow Formulation","year":2021,"lang":"en","type":"article","venue":"2021 IEEE Power &amp; Energy Society General Meeting (PESGM)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Procurement; Demand response; Power flow; Payment; Test (biology); Commission; Environmental economics; Order (exchange); Business; Microeconomics; Economics; Power (physics); Finance; Electric power system; Engineering; Electrical engineering; Marketing; Electricity","score_opus":0.009788778924891068,"score_gpt":0.22739884631258642,"score_spread":0.21761006738769534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236816715","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27222556,0.0033571022,0.7197188,0.0003678335,0.0022829315,0.00032004842,0.00006897191,0.0004892506,0.0011695141],"genre_scores_gemma":[0.62173426,0.00020333681,0.37312758,0.00036642974,0.0006954975,0.00018518428,0.0005176188,0.0002505291,0.0029195754],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99642515,0.00026347942,0.0010036795,0.0008239418,0.00054207625,0.0009416882],"domain_scores_gemma":[0.99727917,0.00089199713,0.00023877401,0.0006808272,0.0006568588,0.00025238976],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0014452477,0.00064159033,0.0006205388,0.0001316933,0.00050680205,0.00030712807,0.00032601162,0.00053404894,0.000104780665],"category_scores_gemma":[0.0010492589,0.0007078782,0.0005622356,0.0010003485,0.000038247752,0.00042674266,0.00009782263,0.00037665342,0.000023896733],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006037046,0.000056482324,0.00014868814,0.00006272606,0.00019733349,0.000003550154,0.0023725815,0.8475778,0.12916659,0.00024115565,0.01915157,0.00096115586],"study_design_scores_gemma":[0.0012906143,0.00013757318,0.00008862202,0.00032043387,0.00010652582,0.00004772888,0.000318734,0.8797055,0.06883005,0.00011593903,0.04790781,0.0011304771],"about_ca_topic_score_codex":0.000058625403,"about_ca_topic_score_gemma":0.0002720358,"teacher_disagreement_score":0.3495087,"about_ca_system_score_codex":0.0005840602,"about_ca_system_score_gemma":0.00020961401,"threshold_uncertainty_score":0.9995372},"labels":[],"label_agreement":null},{"id":"W4238244078","doi":"10.1007/978-0-387-95861-3_18","title":"Economic Analysis","year":2011,"lang":"en","type":"book-chapter","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Context (archaeology); Environmental economics; Resource (disambiguation); Unit (ring theory); State (computer science); Energy (signal processing); Politics; Unit price; Efficient energy use; Industrial organization; Engineering; Natural resource economics; Business; Economics; Computer science; Electrical engineering; Microeconomics; Political science; Geography","score_opus":0.007949964389125933,"score_gpt":0.16536290273645446,"score_spread":0.15741293834732853,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4238244078","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000016029458,0.00037808114,0.074058115,0.0000014157943,0.00023564087,0.00006688472,0.000007641035,0.00035239087,0.9248982],"genre_scores_gemma":[0.0115773585,0.00031563092,0.0005767565,0.000008087619,0.00008121849,0.000004075723,0.00006274637,0.000075515825,0.9872986],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99950814,0.0000015414753,0.00020717253,0.00013880935,0.00004262676,0.00010170634],"domain_scores_gemma":[0.99963146,0.000008868668,0.000036650425,0.00027422362,0.0000105872205,0.000038196144],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000035982066,0.00016846652,0.0002823053,0.0003683075,0.000008752785,0.000013138397,0.00010361045,0.00020018384,0.007289251],"category_scores_gemma":[4.853931e-7,0.00017852186,0.00015308047,0.000025777708,0.000005261037,0.000038072376,0.000009680367,0.00009006154,0.0018194377],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000030766978,0.000003401181,0.00007941989,0.00010371691,0.010871631,0.000012787232,0.00010895098,0.34473243,0.0000049678933,0.58675045,0.050281867,0.0070473035],"study_design_scores_gemma":[0.00023630487,0.000042127387,0.00006511318,0.000051324652,0.004210672,0.000011066974,0.0000013936989,0.34142753,0.00020158992,0.008359235,0.6435313,0.0018623063],"about_ca_topic_score_codex":0.00002211452,"about_ca_topic_score_gemma":0.00012614383,"teacher_disagreement_score":0.59324944,"about_ca_system_score_codex":0.00015326026,"about_ca_system_score_gemma":0.000011273645,"threshold_uncertainty_score":0.99895775},"labels":[],"label_agreement":null},{"id":"W4240680820","doi":"10.3917/scpo.bafoi.2014.01.0087","title":"Accès à l'énergie en Europe","year":2014,"lang":"fr","type":"book-chapter","venue":"Presses de Sciences Po eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Musée de la Civilisation","funders":"","keywords":"Political science; Humanities; Art","score_opus":0.018639439020601313,"score_gpt":0.2269180435069877,"score_spread":0.20827860448638638,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4240680820","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00017037199,0.003313216,0.14159703,0.00017298774,0.0019588994,0.0004150516,0.000017034703,0.00039320238,0.8519622],"genre_scores_gemma":[0.51550263,0.0020312911,0.03814301,0.00035252553,0.0021118007,0.000094918476,0.000035344758,0.0004299939,0.44129848],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9966436,0.00018000745,0.00068561797,0.0008130305,0.0007146462,0.00096310565],"domain_scores_gemma":[0.99809676,0.00050191075,0.00030338325,0.0006266991,0.00018529205,0.0002859568],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0011773579,0.00065896154,0.00058202544,0.0003956357,0.00033699628,0.00047837858,0.0015957647,0.00048646433,0.00070470944],"category_scores_gemma":[0.0002523171,0.00067238574,0.00016226628,0.0001362089,0.0005514598,0.00020934541,0.00032052305,0.0005808206,0.00081493246],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013245763,0.000015720674,0.0002971203,0.00095131114,0.00022433158,0.000079677186,0.0009090815,0.19754742,0.00420455,0.70370257,0.003541517,0.088513464],"study_design_scores_gemma":[0.00032934084,0.00028933128,0.00014902685,0.0010927216,0.00023109512,0.00019371804,0.000012121062,0.1055557,0.0076793144,0.004788022,0.8782555,0.0014241178],"about_ca_topic_score_codex":0.00019020241,"about_ca_topic_score_gemma":0.000052898402,"teacher_disagreement_score":0.87471396,"about_ca_system_score_codex":0.00022770361,"about_ca_system_score_gemma":0.00040610463,"threshold_uncertainty_score":0.99996305},"labels":[],"label_agreement":null},{"id":"W4241283540","doi":"10.32920/ryerson.14664810","title":"Security Constrained Stochastic Power System Scheduling Algorithms - With Wind Electric Generators","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; University of New Brunswick","funders":"","keywords":"Probabilistic logic; Electric power system; Wind power; Mathematical optimization; Scheduling (production processes); Computer science; Power system simulation; Economic dispatch; Power (physics); Transmission (telecommunications); Transmission system; Engineering; Reliability engineering; Control theory (sociology); Electrical engineering; Mathematics","score_opus":0.005058629449334553,"score_gpt":0.1879276741785331,"score_spread":0.18286904472919854,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4241283540","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1117922,0.002688633,0.87573576,0.000012587254,0.0015368968,0.00093998795,0.00002085988,0.0018207721,0.005452295],"genre_scores_gemma":[0.9781388,0.000022237058,0.02115961,0.000015103048,0.00021480888,0.000080436694,0.00014264078,0.00017998755,0.000046349505],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970795,0.0001125198,0.0007734688,0.0007861637,0.0005593111,0.00068907347],"domain_scores_gemma":[0.9984062,0.00007533127,0.00019636532,0.000743016,0.0003481573,0.00023096094],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00035005767,0.00071654865,0.0008630847,0.00043016678,0.00009795701,0.00035884575,0.0003472872,0.00063764595,0.000073237024],"category_scores_gemma":[0.000041860723,0.0006918876,0.0001460359,0.00090750575,0.000032054773,0.00014375421,0.00013151216,0.0010957827,0.000019327266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000061355827,0.000023873205,0.000027219026,0.00070626696,0.0004705412,0.00008521905,0.00031994435,0.9973692,0.00045024537,0.00035307943,0.000065464716,0.00012277816],"study_design_scores_gemma":[0.00048583452,0.000056972574,0.0000135800265,0.0007212784,0.00015360641,0.0002523065,0.0004269322,0.99418724,0.0028096328,0.000010324892,0.000008026772,0.00087427907],"about_ca_topic_score_codex":0.000048098176,"about_ca_topic_score_gemma":0.000018234086,"teacher_disagreement_score":0.8663466,"about_ca_system_score_codex":0.0008167595,"about_ca_system_score_gemma":0.00051832566,"threshold_uncertainty_score":0.9995532},"labels":[],"label_agreement":null},{"id":"W4241913035","doi":"10.32920/ryerson.14647647.v1","title":"A secondary option market design for reserve procurement by renewable energy sources","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Intermittency; Wind power; Governor; Renewable energy; Electric power system; Procurement; Automatic Generation Control; Electricity generation; Computer science; Reliability engineering; Load balancing (electrical power); Automotive engineering; Power (physics); Environmental economics; Engineering; Business; Economics; Electrical engineering; Meteorology; Mathematics","score_opus":0.01454284087538483,"score_gpt":0.20484123753440123,"score_spread":0.1902983966590164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4241913035","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00016004464,0.0061148256,0.9753857,0.000050223138,0.0006287008,0.0008859791,0.000033969434,0.0005249586,0.016215563],"genre_scores_gemma":[0.34638634,0.0037824158,0.5175345,0.00025760563,0.0008593287,0.009345256,0.004803346,0.0007518578,0.11627932],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983007,0.0001186494,0.0004709628,0.00048547107,0.00025784643,0.00036637884],"domain_scores_gemma":[0.99906546,0.00009829338,0.000113540984,0.0004584464,0.00018247626,0.000081766164],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005451333,0.00033550544,0.0003796391,0.00014622953,0.000060120346,0.00023306721,0.00027473323,0.00040443274,0.0003635058],"category_scores_gemma":[0.000050615392,0.0003639556,0.00012180291,0.00017130015,0.0000075718094,0.0001374143,0.00013616397,0.00020686573,0.0000012507733],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017844834,0.00002057441,0.0000045500333,0.0007076524,0.00016048762,0.0000012195803,0.00007463695,0.6676049,0.001244918,0.000015978396,0.32952115,0.0006260499],"study_design_scores_gemma":[0.00037019068,0.00006046401,0.0000025968204,0.00026063083,0.000054878943,0.000004376348,0.000059181173,0.9069196,0.06340503,0.00032123137,0.028064517,0.00047733117],"about_ca_topic_score_codex":0.00059480756,"about_ca_topic_score_gemma":0.00028832068,"teacher_disagreement_score":0.4578512,"about_ca_system_score_codex":0.0003652963,"about_ca_system_score_gemma":0.00019222352,"threshold_uncertainty_score":0.99988127},"labels":[],"label_agreement":null},{"id":"W4245681858","doi":"10.1093/geront/gnv371.02","title":"GOT CARE! AN INTERDISCIPLINARY GERIATRIC OUTREACH AND TRAINING PROGRAM","year":2015,"lang":"en","type":"article","venue":"The Gerontologist","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; Queen's University","funders":"","keywords":"Outreach; Geriatric care; Gerontology; Medical education; Training (meteorology); Psychology; Nursing; Medicine; Political science; Geography","score_opus":0.04372060685748411,"score_gpt":0.30846356194109,"score_spread":0.2647429550836059,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4245681858","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85387975,0.015101484,0.034311254,0.00039117105,0.0016196017,0.0014796779,0.000010435326,0.0030866112,0.090119995],"genre_scores_gemma":[0.99703336,0.00001371439,0.00262564,0.000008021257,0.00011496289,0.00007393354,0.000018004053,0.000024417812,0.0000879723],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992597,0.00006827209,0.00016755446,0.00015456862,0.00009794611,0.00025196798],"domain_scores_gemma":[0.9995463,0.000027171349,0.000033029337,0.0002619316,0.00003611444,0.000095487965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024412073,0.0001345861,0.00016222813,0.000047414287,0.00008655472,0.00006662438,0.00019008375,0.00007414508,0.0000025812662],"category_scores_gemma":[0.000020840878,0.000097535114,0.000021088574,0.00014202113,0.0000641028,0.00014108761,0.0000646366,0.00012163557,0.000008318214],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000082624785,0.0000915324,0.0019835199,0.00015708315,0.00011522239,0.000038327442,0.12096004,0.026774488,0.0001478482,0.0006292076,0.005103852,0.84391624],"study_design_scores_gemma":[0.0051102485,0.0042569195,0.023527896,0.00014688289,0.00040909628,0.00126855,0.10561022,0.8402455,0.0005254532,0.0022208556,0.014091287,0.002587095],"about_ca_topic_score_codex":0.000042707663,"about_ca_topic_score_gemma":0.0002222788,"teacher_disagreement_score":0.84132916,"about_ca_system_score_codex":0.00011595721,"about_ca_system_score_gemma":0.000022030286,"threshold_uncertainty_score":0.39773667},"labels":[],"label_agreement":null},{"id":"W4245783092","doi":"10.1109/59.932289","title":"Inter-utilities power-exchange coordination: a market-oriented approach","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electric power system; Scheduling (production processes); Computer science; Decomposition; Grid; Power system simulation; Independence (probability theory); Power market; Economic dispatch; Mathematical optimization; Market oriented; Power (physics); Economics; Mathematics","score_opus":0.009348881120758408,"score_gpt":0.19907350056024545,"score_spread":0.18972461943948704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4245783092","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001707934,0.0006127467,0.8906262,0.000041307514,0.0056352103,0.00077028497,0.000048680136,0.0011326072,0.099425055],"genre_scores_gemma":[0.98361784,0.00007400153,0.00027238342,0.000026568165,0.00003404645,0.00039999254,0.000011751321,0.00010781112,0.015455591],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978373,0.00016530513,0.00061340805,0.000418968,0.0004358132,0.00052921363],"domain_scores_gemma":[0.9988801,0.000098615565,0.00008628165,0.00059703994,0.00017174096,0.00016623827],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003753008,0.00040160678,0.0004177876,0.0005564159,0.00017638486,0.00012793712,0.00025267768,0.00024530906,0.0004667798],"category_scores_gemma":[0.000006970236,0.000422259,0.00015966622,0.0010094538,0.000044158813,0.00040776632,0.0000015510922,0.00034600738,0.00014528245],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007877724,0.0024426763,0.0005136528,0.0028886646,0.0027634015,0.00020281057,0.021203501,0.76148665,0.0020837993,0.0024891195,0.1969244,0.0062135737],"study_design_scores_gemma":[0.0021797693,0.0005463229,0.00013614552,0.00046939027,0.00012007691,0.00068354624,0.0030590952,0.78951603,0.0012817142,0.000009187674,0.20057881,0.001419892],"about_ca_topic_score_codex":0.000062179206,"about_ca_topic_score_gemma":0.000011869381,"teacher_disagreement_score":0.98190993,"about_ca_system_score_codex":0.0004431702,"about_ca_system_score_gemma":0.00002973123,"threshold_uncertainty_score":0.9998229},"labels":[],"label_agreement":null},{"id":"W4248057387","doi":"10.5547/01956574.42.s12.dolm","title":"Offer Price Information and the Exercise of Market Power: The Effect of the Publication of the Historical Trading Report on Competition in the Alberta Electricity Market","year":2020,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University; University of Calgary","funders":"","keywords":"Electricity; Competition (biology); Electricity market; Economics; Market power; Electricity price; Operator (biology); Microeconomics; Industrial organization; Business; Engineering","score_opus":0.003044185735312914,"score_gpt":0.16255974847575128,"score_spread":0.15951556274043835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248057387","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77934474,0.003600345,0.042121496,0.049640734,0.0021699169,0.0036261694,0.000013428129,0.00008797078,0.1193952],"genre_scores_gemma":[0.9994742,0.00017994351,0.000010206906,0.00015329229,0.00005017398,0.000020197693,0.0000016898041,0.0000112074995,0.00009904127],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974956,0.0010577104,0.0006936853,0.000075485885,0.00052573695,0.00015178145],"domain_scores_gemma":[0.9977072,0.0010883772,0.00066583935,0.0004140787,0.00009985262,0.00002466282],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031822275,0.00013720884,0.00024245374,0.00006917793,0.00018366345,0.00004834245,0.0006538863,0.000065704386,0.000024876721],"category_scores_gemma":[0.00086489035,0.000048892154,0.0001287466,0.00087782135,0.0000772253,0.00021128055,0.00004191525,0.00042318454,2.042151e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.01149317,0.0005788488,0.037369594,0.0018204647,0.0019573548,0.000014042086,0.09763398,0.3307366,0.010679568,0.092389435,0.36518657,0.050140396],"study_design_scores_gemma":[0.005040308,0.0006892646,0.10019491,0.0007581027,0.00057011994,0.001326096,0.0006143689,0.846285,0.021616407,0.0009235515,0.021489969,0.0004919184],"about_ca_topic_score_codex":0.0001340714,"about_ca_topic_score_gemma":0.000018481185,"teacher_disagreement_score":0.5155484,"about_ca_system_score_codex":0.00017458372,"about_ca_system_score_gemma":0.00004385667,"threshold_uncertainty_score":0.19937642},"labels":[],"label_agreement":null},{"id":"W4249411402","doi":"10.33423/jabe.v22i11.3749","title":"A Game Theoretic Approach in Bidding Strategy in Iran Wholesale Electricity Market","year":2020,"lang":"en","type":"article","venue":"Journal of Applied Business and Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bidding; Profit maximization; Common value auction; Electricity market; Profit (economics); Microeconomics; Electricity; Business; Order (exchange); Economics; Industrial organization; Finance","score_opus":0.010474667970230462,"score_gpt":0.17199343912468737,"score_spread":0.1615187711544569,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249411402","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.967006,0.00035124188,0.02006324,0.000053505264,0.000049176462,0.00012878703,0.0000012808756,0.000015066437,0.012331659],"genre_scores_gemma":[0.9983712,0.0009168001,0.00057008537,0.000035466874,0.00007842374,0.0000032849334,0.0000015302621,0.000021595928,0.0000016478032],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99924344,0.00000948582,0.00044276344,0.00010139195,0.00003701673,0.0001658802],"domain_scores_gemma":[0.99973446,0.000024133034,0.00011933511,0.00004998303,0.000016609662,0.00005546399],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027422883,0.000110957626,0.00030353994,0.00020029512,0.00000964769,0.000057160505,0.00009845983,0.000072248135,0.000007565007],"category_scores_gemma":[0.00000733089,0.00011189522,0.000019946208,0.00040644463,0.000012077333,0.00016046077,0.000011837054,0.00019781974,8.251159e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010412323,0.000023207873,0.0015627985,0.00019741968,0.000016034546,0.0000057766833,0.00035201726,0.9924456,0.00028937435,0.0011828971,0.000046625337,0.0037741645],"study_design_scores_gemma":[0.0010867998,0.000024571105,0.012750135,0.00003707804,0.0000098019855,0.000031122298,0.00018122836,0.9846971,0.00013478255,0.0007821271,0.00009477096,0.00017050668],"about_ca_topic_score_codex":0.0000031529853,"about_ca_topic_score_gemma":0.0000044711715,"teacher_disagreement_score":0.031365123,"about_ca_system_score_codex":0.000097926124,"about_ca_system_score_gemma":0.000027541824,"threshold_uncertainty_score":0.45629546},"labels":[],"label_agreement":null},{"id":"W4251989391","doi":"10.1002/9780470932117.index","title":"Index","year":2011,"lang":"en","type":"paratext","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Index (typography); Computer science; Information retrieval; Citation; Probabilistic logic; Library science; World Wide Web; Artificial intelligence","score_opus":0.008525914379281513,"score_gpt":0.19109723437821785,"score_spread":0.18257131999893633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4251989391","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000023789548,0.0014210469,0.24551703,0.0000010752649,0.0028110663,0.00009439526,0.0000042835186,0.00022275686,0.749926],"genre_scores_gemma":[0.023654789,0.0006714858,0.0006453037,0.000024254885,0.0002965044,0.00003257724,0.000114566246,0.00011412094,0.9744464],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99946654,0.000008328036,0.00016143922,0.00011224853,0.00008096568,0.00017048986],"domain_scores_gemma":[0.9996923,0.000007760108,0.000021921736,0.00021636838,0.000023556833,0.000038062186],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000030475203,0.00016432477,0.00018193327,0.00013421457,0.000010081467,0.000017125341,0.00014284486,0.00030097572,0.013882265],"category_scores_gemma":[0.000002149843,0.00015985547,0.00003590145,0.00014424691,0.0000042060547,0.000042561194,0.0000114981585,0.00018068295,0.03545695],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[3.827176e-7,0.0000019692009,0.000002224132,0.00007643764,0.00003387927,6.407962e-7,0.000020240665,0.011222752,0.000005191685,0.000044499735,0.98803836,0.0005534461],"study_design_scores_gemma":[0.00009408978,0.000011541737,0.000009605435,0.000052216805,0.000011212038,0.0000067818683,0.00000205201,0.033219766,0.00056401023,0.000011249363,0.965645,0.00037245912],"about_ca_topic_score_codex":0.000028120445,"about_ca_topic_score_gemma":0.000006056017,"teacher_disagreement_score":0.24487174,"about_ca_system_score_codex":0.00006590705,"about_ca_system_score_gemma":0.000020434329,"threshold_uncertainty_score":0.9870192},"labels":[],"label_agreement":null},{"id":"W4252268603","doi":"10.32920/ryerson.14648058","title":"Unit commitment using complementarity","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University; Toronto Metropolitan University","funders":"","keywords":"Mathematical optimization; Power system simulation; Complementarity (molecular biology); Computer science; Nonlinear system; Complementarity theory; Economic dispatch; Linear programming; Generator (circuit theory); Integer programming; Grid; Integer (computer science); Power (physics); Mathematics; Electric power system","score_opus":0.05794564141867547,"score_gpt":0.2770386808553337,"score_spread":0.2190930394366582,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4252268603","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.085913226,0.00093332503,0.88522243,0.000032260326,0.002034924,0.00057106256,0.000026415433,0.00074845896,0.02451787],"genre_scores_gemma":[0.9502709,0.00006116675,0.048903808,0.000046687208,0.00007630249,0.000022435472,0.00044395297,0.00005062241,0.00012411166],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990487,0.00005030941,0.0003055303,0.00020584777,0.00017887761,0.00021075286],"domain_scores_gemma":[0.9993868,0.000019755005,0.000042582524,0.00042980546,0.00006673072,0.000054359964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012019166,0.00021153102,0.00027429665,0.00008871621,0.000040250965,0.00011520265,0.0001783865,0.00014328914,0.0005796666],"category_scores_gemma":[0.000004160357,0.00024382955,0.00006705481,0.00013715001,0.0000069310954,0.000046080713,0.00027874904,0.0003368552,0.000008796333],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.9689575e-7,0.000024936246,0.0014742477,0.00032874534,0.00020708654,0.000009707567,0.00016704363,0.99543697,0.00026539207,0.00018921627,0.0015671228,0.00032892314],"study_design_scores_gemma":[0.00015975976,0.000005349154,0.0003075744,0.00013252452,0.00005508749,0.0000077500345,0.000097419885,0.995188,0.0020370136,0.000046546025,0.0016385509,0.00032439866],"about_ca_topic_score_codex":0.00057301833,"about_ca_topic_score_gemma":0.00032081865,"teacher_disagreement_score":0.8643577,"about_ca_system_score_codex":0.0003891746,"about_ca_system_score_gemma":0.000060639653,"threshold_uncertainty_score":0.99430805},"labels":[],"label_agreement":null},{"id":"W4252287735","doi":"10.1016/s1464-2859(18)30132-9","title":"SFC order from Asian defence customer, Simark oil &amp; gas order","year":2018,"lang":"en","type":"article","venue":"Fuel Cells Bulletin","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Order (exchange); Power grid; Engineering; German; Power (physics); Fossil fuel; Petroleum engineering; Electrical engineering; Waste management; Business; Finance; Geography; Archaeology; Physics","score_opus":0.00584930395490416,"score_gpt":0.18999024441448806,"score_spread":0.1841409404595839,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4252287735","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019425606,0.003897964,0.1737957,0.0013012922,0.005721192,0.00045974806,0.00008066008,0.002170192,0.7931476],"genre_scores_gemma":[0.8794587,0.00091571436,0.09304596,0.00068862224,0.0016814715,0.00008879069,0.00018459134,0.00034242103,0.023593731],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983061,0.00007610841,0.0003738543,0.00039873904,0.0003080856,0.00053713645],"domain_scores_gemma":[0.99887913,0.00009680525,0.000074068244,0.0005681893,0.00023466113,0.00014715643],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00018585981,0.0003052899,0.000279288,0.00012816708,0.00009012678,0.00008604389,0.0003441746,0.00020375178,0.007108941],"category_scores_gemma":[0.00009968527,0.00032429106,0.000054740212,0.0006805556,0.00006369582,0.000061651495,0.000056174304,0.00024225638,0.019355716],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006618057,0.0001480476,0.00036849699,0.000414461,0.0002018711,0.000031502193,0.0022251774,0.026594987,0.01968659,0.00006813713,0.9381732,0.012021394],"study_design_scores_gemma":[0.0004555154,0.00003174052,0.00007022921,0.00006945163,0.000031449494,0.0000063505777,0.000033962595,0.0060146055,0.003925583,0.00003430435,0.9888517,0.00047506666],"about_ca_topic_score_codex":0.00019260947,"about_ca_topic_score_gemma":0.00013913662,"teacher_disagreement_score":0.8600331,"about_ca_system_score_codex":0.00010752199,"about_ca_system_score_gemma":0.000042634772,"threshold_uncertainty_score":0.9999209},"labels":[],"label_agreement":null},{"id":"W4253026764","doi":"10.1017/cbo9781139924672.007","title":"Economics","year":2018,"lang":"en","type":"book-chapter","venue":"Cambridge University Press eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Mathematical optimization; Variety (cybernetics); Convex optimization; Conic optimization; Semidefinite programming; Computer science; Second-order cone programming; Selection (genetic algorithm); Optimization problem; Regular polygon; Class (philosophy); Convex analysis; Mathematics; Artificial intelligence","score_opus":0.010741044038676928,"score_gpt":0.15325981993632357,"score_spread":0.14251877589764664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4253026764","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00006557834,0.00013818199,0.0053720623,0.0000012666244,0.00058259617,0.00023673351,0.00010799577,0.00047338876,0.9930222],"genre_scores_gemma":[0.0006110441,0.00024221557,0.00019136332,0.000010888539,0.00020545242,3.6700405e-7,0.000049159265,0.000092028284,0.9985975],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992871,0.000008297403,0.00015463163,0.00026315285,0.00007386307,0.00021295431],"domain_scores_gemma":[0.99930006,0.000021214737,0.0000798213,0.00042345,0.00007258635,0.00010288986],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000044381137,0.0002855537,0.00028265076,0.00017050085,0.000060700382,0.000031113872,0.00031831395,0.00036427838,0.000013285216],"category_scores_gemma":[0.0000019251675,0.00039927888,0.00010974879,0.0000049279333,0.00006572393,0.00007389008,0.00008533156,0.0002256655,0.00008889435],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001797977,0.0000022026736,4.0570208e-7,0.00014292313,0.0002992186,0.00006078537,0.00004933061,0.0011203983,0.000015020608,0.7514377,0.24600105,0.00085294596],"study_design_scores_gemma":[0.00021015997,0.000021028065,6.648036e-7,0.000067402114,0.00009018468,0.000012298946,0.000003274805,0.0066112103,0.00027924802,0.0000052319265,0.99230707,0.0003922239],"about_ca_topic_score_codex":0.000009519338,"about_ca_topic_score_gemma":0.0000015106538,"teacher_disagreement_score":0.7514325,"about_ca_system_score_codex":0.00039508787,"about_ca_system_score_gemma":0.00004136725,"threshold_uncertainty_score":0.9998459},"labels":[],"label_agreement":null},{"id":"W4253122965","doi":"10.1109/tpwrs.2002.804989","title":"Modeling competition in transmission expansion","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Transmission (telecommunications); Competition (biology); Electricity market; Investment (military); Lagrangian relaxation; Electricity; Transmission system; Reliability (semiconductor); Power transmission; Industrial organization; Perfect competition; Computer science; Economics; Engineering; Microeconomics; Telecommunications; Mathematical optimization; Electrical engineering; Power (physics); Mathematics","score_opus":0.013504323132515579,"score_gpt":0.1958320562223181,"score_spread":0.18232773308980255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4253122965","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013925551,0.0007018011,0.97860813,0.000026572412,0.0018708762,0.00044122,0.000007735882,0.000563967,0.0038541697],"genre_scores_gemma":[0.9990039,0.00027744923,0.0002425285,0.000012443788,0.000011381336,0.00009720399,0.0000031139411,0.000064269916,0.00028769765],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985233,0.000086020045,0.0005086111,0.00026117326,0.00030089525,0.000320028],"domain_scores_gemma":[0.9995251,0.000034519842,0.000025225872,0.0002760219,0.000041608957,0.00009749866],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016269801,0.0002312497,0.0002643748,0.00045714562,0.00008609041,0.000052110034,0.000119369215,0.00018465541,0.00015135643],"category_scores_gemma":[0.0000010229619,0.00024451897,0.000081047234,0.0005475948,0.000009044895,0.00028772623,2.4024732e-7,0.0002908632,0.00016635116],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007553273,0.00007956898,0.0000016355025,0.000073474555,0.000013884387,0.0000068956156,0.00066109543,0.9954595,0.0026082126,0.000036646434,0.000095218,0.0009563157],"study_design_scores_gemma":[0.00051972555,0.00006396421,0.0000023066418,0.000333321,0.000010063287,0.00002997225,0.00009761385,0.99620396,0.0019878892,0.0000036497315,0.0004981811,0.0002493475],"about_ca_topic_score_codex":0.00006253455,"about_ca_topic_score_gemma":0.000014403154,"teacher_disagreement_score":0.98507833,"about_ca_system_score_codex":0.0002592468,"about_ca_system_score_gemma":0.0000070465435,"threshold_uncertainty_score":0.9971195},"labels":[],"label_agreement":null},{"id":"W4254187592","doi":"10.5383/ijtee.10.02.004","title":"Financial Risk and market Effects for the Congestion Costs of the electricity System in Italy","year":2015,"lang":"en","type":"article","venue":"International Journal of Thermal and Environmental Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity market; Electricity; Business; Electric power system; Grid; Microeconomics; Environmental economics; Industrial organization; Finance; Economics; Power (physics)","score_opus":0.0023592710336569488,"score_gpt":0.1561090303489017,"score_spread":0.15374975931524473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4254187592","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9736992,0.0016647074,0.02379769,0.000017946773,0.0006313082,0.0001361348,0.000009508011,0.000006407697,0.000037056518],"genre_scores_gemma":[0.99961,0.00013774444,0.00016516328,0.00000397986,0.00006360733,0.0000051929587,5.724705e-7,0.000008576301,0.000005133353],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99953955,0.000018572755,0.00018500586,0.000039427654,0.00014913692,0.00006832262],"domain_scores_gemma":[0.99970984,0.00013780437,0.00008162472,0.000035773828,0.000012242505,0.000022692266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002734303,0.00006689133,0.000092696915,0.000052646552,0.000013108252,0.000011929995,0.000108900684,0.00003163947,5.591463e-7],"category_scores_gemma":[0.00007445288,0.000044319113,0.0000303174,0.000036910777,0.000013577149,0.00009091034,0.000021471791,0.00010171963,8.724148e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010723741,0.000019581978,0.018078253,0.000059745726,0.00010508427,0.0000054723964,0.00025280527,0.95620024,0.012191184,0.00016539407,0.000065286375,0.012749708],"study_design_scores_gemma":[0.0010468751,0.00007457269,0.14215876,0.00017839302,0.00003606192,0.00012838078,0.00005297677,0.851368,0.0047248364,0.000011371913,0.00013993484,0.000079841135],"about_ca_topic_score_codex":0.000011846902,"about_ca_topic_score_gemma":0.0000020501109,"teacher_disagreement_score":0.12408052,"about_ca_system_score_codex":0.00020537477,"about_ca_system_score_gemma":0.000006120029,"threshold_uncertainty_score":0.1807281},"labels":[],"label_agreement":null},{"id":"W4255106024","doi":"10.2139/ssrn.3979516","title":"Kriging Surrogate Model Enabled Heuristic Algorithm for Coordinated Volt/Var Management in Active Distribution Networks","year":2021,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nexen (Canada)","funders":"","keywords":"Volt; Kriging; Surrogate model; Computer science; Heuristic; Mathematical optimization; Algorithm; Artificial intelligence; Machine learning; Mathematics; Engineering; Voltage; Electrical engineering","score_opus":0.004160660196032878,"score_gpt":0.2055503201266053,"score_spread":0.20138965993057242,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255106024","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003440834,0.0023101198,0.99299073,0.000046971858,0.00032404813,0.00035268735,0.000015711366,0.00012233002,0.0003965871],"genre_scores_gemma":[0.99175954,0.0041698706,0.002851372,0.000013011284,0.000120257806,0.00006721953,0.000236157,0.0000673553,0.00071524415],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970912,0.00007432782,0.00041491672,0.00024420107,0.00017486396,0.002000527],"domain_scores_gemma":[0.99945605,0.00005420984,0.00009820609,0.0001510957,0.00016727789,0.00007318762],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008428597,0.00022156935,0.00027245382,0.00014081543,0.00013927519,0.00007609443,0.00015941678,0.000113310736,0.00000533043],"category_scores_gemma":[0.000031044237,0.0002503477,0.00009446866,0.0006701272,0.000009457138,0.00024247539,0.00002498008,0.0010061383,0.0000028313698],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024733996,0.000038900544,0.000018752564,0.000026023423,0.0002709421,0.000024204977,0.00003536063,0.92922163,0.000058747966,0.007582141,0.00018066015,0.06251789],"study_design_scores_gemma":[0.0014482266,0.000046476172,0.000022819402,0.000061704966,0.00007175616,0.00014392108,0.00022587189,0.9861338,0.00030943617,0.011109337,0.00018575818,0.0002408947],"about_ca_topic_score_codex":0.000009329047,"about_ca_topic_score_gemma":0.00011001395,"teacher_disagreement_score":0.99013937,"about_ca_system_score_codex":0.002769877,"about_ca_system_score_gemma":0.00040209226,"threshold_uncertainty_score":0.9999949},"labels":[],"label_agreement":null},{"id":"W4255379149","doi":"10.32920/ryerson.14647647","title":"A secondary option market design for reserve procurement by renewable energy sources","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Intermittency; Wind power; Governor; Renewable energy; Electric power system; Procurement; Automatic Generation Control; Electricity generation; Computer science; Reliability engineering; Load balancing (electrical power); Automotive engineering; Power (physics); Control engineering; Engineering; Business; Electrical engineering; Meteorology","score_opus":0.01454284087538483,"score_gpt":0.20484123753440123,"score_spread":0.1902983966590164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255379149","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00016004464,0.0061148256,0.9753857,0.000050223138,0.0006287008,0.0008859791,0.000033969434,0.0005249586,0.016215563],"genre_scores_gemma":[0.34638634,0.0037824158,0.5175345,0.00025760563,0.0008593287,0.009345256,0.004803346,0.0007518578,0.11627932],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983007,0.0001186494,0.0004709628,0.00048547107,0.00025784643,0.00036637884],"domain_scores_gemma":[0.99906546,0.00009829338,0.000113540984,0.0004584464,0.00018247626,0.000081766164],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005451333,0.00033550544,0.0003796391,0.00014622953,0.000060120346,0.00023306721,0.00027473323,0.00040443274,0.0003635058],"category_scores_gemma":[0.000050615392,0.0003639556,0.00012180291,0.00017130015,0.0000075718094,0.0001374143,0.00013616397,0.00020686573,0.0000012507733],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017844834,0.00002057441,0.0000045500333,0.0007076524,0.00016048762,0.0000012195803,0.00007463695,0.6676049,0.001244918,0.000015978396,0.32952115,0.0006260499],"study_design_scores_gemma":[0.00037019068,0.00006046401,0.0000025968204,0.00026063083,0.000054878943,0.000004376348,0.000059181173,0.9069196,0.06340503,0.00032123137,0.028064517,0.00047733117],"about_ca_topic_score_codex":0.00059480756,"about_ca_topic_score_gemma":0.00028832068,"teacher_disagreement_score":0.4578512,"about_ca_system_score_codex":0.0003652963,"about_ca_system_score_gemma":0.00019222352,"threshold_uncertainty_score":0.99988127},"labels":[],"label_agreement":null},{"id":"W4256047829","doi":"10.22215/etd/2012-09447","title":"Public policy and economic efficiency in Ontario's electric market : 2002 to 2011","year":2012,"lang":"en","type":"dissertation","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University; Canadian Heritage; Library and Archives Canada","funders":"","keywords":"Political science; Humanities; Library science; Computer science; Art","score_opus":0.008253189349752126,"score_gpt":0.2004487545828023,"score_spread":0.19219556523305018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4256047829","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1573159,0.0020056637,0.0010963227,0.000037097718,0.0010030948,0.0007744373,0.0000037299892,0.00025858538,0.83750516],"genre_scores_gemma":[0.86056733,0.0001627517,0.00027844246,0.00002431748,0.00013819014,0.00011415916,0.000114936745,0.0000993076,0.13850056],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9986086,0.000027381164,0.00039920944,0.00027929258,0.00010861139,0.0005769017],"domain_scores_gemma":[0.9994672,0.000043045664,0.000057878056,0.00022733965,0.000028466606,0.00017607214],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0002350986,0.0002983286,0.00032782528,0.001514729,0.000029797873,0.00007875678,0.00017946582,0.00029560833,0.003043567],"category_scores_gemma":[0.000032166892,0.00033441003,0.000036373975,0.00038205474,0.0000024947046,0.00023108031,0.000011804618,0.0002842665,0.00037974078],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004107152,0.0008536222,0.160265,0.0032932435,0.0011172293,0.000037869428,0.018326405,0.063299626,0.0059126867,0.02307168,0.5208711,0.20254081],"study_design_scores_gemma":[0.0014009582,0.00024241614,0.8525616,0.0002000057,0.00008057241,0.000051081348,0.00011087959,0.0820509,0.0010236102,0.00011735999,0.05908625,0.0030743675],"about_ca_topic_score_codex":0.071438946,"about_ca_topic_score_gemma":0.6022263,"teacher_disagreement_score":0.7032514,"about_ca_system_score_codex":0.001665761,"about_ca_system_score_gemma":0.00040302618,"threshold_uncertainty_score":0.9999108},"labels":[],"label_agreement":null},{"id":"W4281967110","doi":"10.1016/j.ijepes.2022.108343","title":"Integration of machine learning with economic energy scheduling","year":2022,"lang":"en","type":"article","venue":"International Journal of Electrical Power & Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Computer science; Range (aeronautics); Power (physics); Scheduling (production processes); Electric power system; Algorithm; Engineering; Mathematics","score_opus":0.004197431195464159,"score_gpt":0.19169579307417006,"score_spread":0.18749836187870592,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281967110","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.045012765,0.0076474864,0.9372059,0.00010765859,0.004613353,0.00008761947,0.000017407809,0.000120054254,0.005187775],"genre_scores_gemma":[0.9987047,0.00018671539,0.0004931142,0.000022171229,0.00024939326,0.000014340483,0.000024239554,0.000047443893,0.0002579077],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978551,0.00018292207,0.0008986985,0.00014334187,0.0007093311,0.00021058151],"domain_scores_gemma":[0.998728,0.00013964635,0.00060694787,0.00010963267,0.00033359707,0.000082190476],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004087226,0.00018151148,0.00036874777,0.0007081005,0.000062224695,0.000057982077,0.00048197462,0.000059663995,0.00007298362],"category_scores_gemma":[0.000043965236,0.00016460875,0.00012270967,0.00034166867,0.000016299104,0.0002547207,0.00003890628,0.0003766485,0.0000011797573],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014082363,0.000045956567,0.00028124498,0.0000038499707,0.00037633316,0.0000392191,0.00008232024,0.9762104,0.007381086,0.013705469,0.0003456944,0.0013875979],"study_design_scores_gemma":[0.0008890895,0.0007792437,0.000035802626,0.00007206773,0.00003416358,0.0011503574,0.00008144047,0.9664728,0.0053026285,0.00008002128,0.024869233,0.00023312442],"about_ca_topic_score_codex":0.0002803109,"about_ca_topic_score_gemma":0.000013718885,"teacher_disagreement_score":0.9536919,"about_ca_system_score_codex":0.0008701653,"about_ca_system_score_gemma":0.0001307322,"threshold_uncertainty_score":0.671255},"labels":[],"label_agreement":null},{"id":"W4283793830","doi":"10.1016/j.eneco.2022.106169","title":"How do variable renewable energy technologies affect firm-level day-ahead output decisions: Evidence from the Turkish wholesale electricity market","year":2022,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"North Dakota Agricultural Experiment Station","keywords":"Renewable energy; Electricity market; Panel data; Economics; Turkish; Electricity; Industrial organization; Variable (mathematics); Variable renewable energy; Business; Microeconomics; Econometrics; Energy storage","score_opus":0.018237842630455952,"score_gpt":0.18675329401588972,"score_spread":0.16851545138543378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283793830","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015350313,0.027091483,0.9462749,0.0008928209,0.0023000892,0.00030406943,0.0002872787,0.0015949314,0.0059041525],"genre_scores_gemma":[0.98048824,0.006091082,0.0060455203,0.00015074442,0.00019006694,0.00042742712,0.00010220785,0.000118439806,0.006386297],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980291,0.00022010988,0.00042108382,0.0005696338,0.00018925138,0.0005708252],"domain_scores_gemma":[0.99697065,0.0016715741,0.00017859254,0.0010659099,0.000049069084,0.00006419045],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000713444,0.0003475858,0.00041718796,0.00021240645,0.00042889544,0.00034090062,0.0011831382,0.00020110155,0.00010562336],"category_scores_gemma":[0.00056983234,0.00033790938,0.00011289218,0.00076575845,0.000040175586,0.0004956223,0.00038755406,0.00031754002,0.0000028755148],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030601073,0.00003216279,0.0013063702,0.000006782117,0.00016710245,0.0000063477946,0.00007202114,0.8396738,0.00025305772,0.0011526592,0.13189968,0.025399396],"study_design_scores_gemma":[0.00032344423,0.000077807956,0.00016079702,0.000065069675,0.0000424208,0.00002242791,0.00020579656,0.6990487,0.004559821,0.0047629536,0.29020458,0.0005262],"about_ca_topic_score_codex":0.002135824,"about_ca_topic_score_gemma":0.0009478912,"teacher_disagreement_score":0.9651379,"about_ca_system_score_codex":0.00084802683,"about_ca_system_score_gemma":0.00012847169,"threshold_uncertainty_score":0.9999073},"labels":[],"label_agreement":null},{"id":"W4283829705","doi":"10.18280/mmep.090307","title":"Dynamic Economic Load Dispatch Using Linear Programming and Mathematical-Based Models","year":2022,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Mathematical optimization; Computer science; Linearization; Linear programming; Piecewise linear function; Optimization problem; Process (computing); Electric power system; Software; Power (physics); Mathematics; Nonlinear system","score_opus":0.0162046339800606,"score_gpt":0.199507341369815,"score_spread":0.18330270738975438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283829705","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08102474,0.0007671896,0.91705465,0.000026355608,0.000078786274,0.00040236008,0.0000071502795,0.0005279089,0.000110835],"genre_scores_gemma":[0.7697134,0.00003088103,0.22996965,0.0000051047664,0.0000137694815,0.0001370511,0.000006244522,0.00009898168,0.00002494068],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985221,0.000019478406,0.00047126267,0.00030240612,0.00023596978,0.0004487668],"domain_scores_gemma":[0.99943835,0.00011787264,0.00004686887,0.00022815313,0.000020391555,0.00014837587],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00047060754,0.00029008175,0.0003800285,0.00013980649,0.0001569536,0.000088805464,0.00012253222,0.00008106519,0.00001824966],"category_scores_gemma":[0.000009854944,0.00031035676,0.00005268612,0.00015418777,0.000024573557,0.00015153697,0.00007174688,0.00030224703,0.0000045222328],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000024817487,0.000026152682,0.0000032883102,0.0012345893,0.000031127525,0.0000019302727,0.00048233318,0.9951524,0.00015577048,0.0027057424,0.000002356585,0.0002018251],"study_design_scores_gemma":[0.0002632376,0.000036439127,2.5055937e-7,0.00018782952,0.000041662563,0.000053287273,0.000027914064,0.99222,0.000029667715,0.0067336704,0.00006432881,0.00034172015],"about_ca_topic_score_codex":0.000008686137,"about_ca_topic_score_gemma":4.2065037e-7,"teacher_disagreement_score":0.68868864,"about_ca_system_score_codex":0.0003156367,"about_ca_system_score_gemma":0.000030390958,"threshold_uncertainty_score":0.99993485},"labels":[],"label_agreement":null},{"id":"W4285294500","doi":"10.1109/icjece.2022.3153311","title":"Optical Energy Policy for Electricity Tariff: An Optimization Approach Over Price Integration","year":2022,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Tariff; Particle swarm optimization; Electricity; Economics; Genetic algorithm; Industrial organization; Business; Microeconomics; Econometrics; Environmental economics; Mathematical optimization; International economics; Engineering; Electrical engineering; Mathematics","score_opus":0.004348538602430335,"score_gpt":0.16694746444979008,"score_spread":0.16259892584735974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285294500","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005566245,0.0006235324,0.9932162,0.000034145414,0.00026593552,0.00011872019,0.0000052615414,0.00005178094,0.000118170494],"genre_scores_gemma":[0.9315295,0.000026708392,0.0678219,0.00008788526,0.0004231315,0.000024529194,0.000029502682,0.0000435681,0.000013283546],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99890506,0.00003310316,0.00035333287,0.00014714137,0.0001628883,0.00039850135],"domain_scores_gemma":[0.999246,0.00007716217,0.000065978216,0.00009102845,0.00010242774,0.0004174272],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021095158,0.00016656565,0.00023721614,0.00079075235,0.00014202233,0.000096120406,0.0001953055,0.000073697694,0.0000073066503],"category_scores_gemma":[0.00005067571,0.00017891306,0.00006390059,0.00090023986,0.000007932866,0.00024002326,0.00001089822,0.00031131966,4.545837e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008477364,0.000015784892,0.000023696444,0.000013310912,0.00003611968,0.000007058919,0.00008445575,0.9831599,0.0001925735,0.007917948,0.00035726835,0.008183381],"study_design_scores_gemma":[0.00032822308,0.00040027677,0.00014162561,0.0000062327977,0.000018016672,0.0003389925,0.0000036329322,0.9969478,0.0001697102,0.000050885177,0.0014050147,0.00018954434],"about_ca_topic_score_codex":0.00023625739,"about_ca_topic_score_gemma":0.00003715635,"teacher_disagreement_score":0.9259632,"about_ca_system_score_codex":0.0005995249,"about_ca_system_score_gemma":0.00029625435,"threshold_uncertainty_score":0.72958624},"labels":[],"label_agreement":null},{"id":"W4286744901","doi":"10.2139/ssrn.4157798","title":"Pricing Inconsistency Between the Futures and Transmission Congestion Contract Markets in the NYISO","year":2022,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal; Concordia University","funders":"","keywords":"Futures contract; Business; Financial economics; Forward market; Transmission (telecommunications); Economics; Microeconomics; Telecommunications; Computer science","score_opus":0.004094091497630467,"score_gpt":0.19381615806786934,"score_spread":0.18972206657023888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4286744901","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91512406,0.03382871,0.045461517,0.0024927165,0.00034435053,0.00067640055,0.0000028843053,0.00010087278,0.0019684953],"genre_scores_gemma":[0.9959708,0.003756745,0.000026980393,0.000050955485,0.00012136861,0.000021371936,0.000003631052,0.000019936006,0.000028212891],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99809176,0.00042981634,0.00028072868,0.00010548431,0.00028052533,0.00081169844],"domain_scores_gemma":[0.99947155,0.00029993258,0.000073921365,0.00011186097,0.000014509352,0.000028260314],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033727281,0.00012085806,0.00013660504,0.00011327941,0.00047662912,0.000060376817,0.00024631486,0.00004307916,0.000015297937],"category_scores_gemma":[0.000035744823,0.000077794204,0.000041393665,0.00032239172,0.00001617544,0.00012241236,0.000014315823,0.0019643074,5.640715e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019631207,0.0001079002,0.03563879,0.000089556255,0.00054776546,0.00004201654,0.012289189,0.07300947,0.001484848,0.018235233,0.0006555533,0.8577034],"study_design_scores_gemma":[0.009888552,0.0023526258,0.57030225,0.00032682755,0.0008050066,0.015678838,0.03552082,0.230445,0.00048662012,0.0880355,0.04383578,0.0023221904],"about_ca_topic_score_codex":0.000033224,"about_ca_topic_score_gemma":0.00011731343,"teacher_disagreement_score":0.8553812,"about_ca_system_score_codex":0.00056330435,"about_ca_system_score_gemma":0.0002415069,"threshold_uncertainty_score":0.85340476},"labels":[],"label_agreement":null},{"id":"W4292291461","doi":"10.1049/esi2.12078","title":"Day‐ahead unit commitment for hydro‐thermal coordination with high participation of wind power","year":2022,"lang":"en","type":"article","venue":"IET Energy Systems Integration","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Power system simulation; Integer programming; Mathematical optimization; Computer science; Linear programming; Stochastic programming; Computation; Wind power; Electric power system; Reduction (mathematics); Unit (ring theory); Operations research; Power (physics); Engineering; Mathematics; Algorithm","score_opus":0.009660343172500084,"score_gpt":0.21171714137898956,"score_spread":0.20205679820648947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4292291461","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31314778,0.0003191953,0.6814117,0.00009185453,0.0016737321,0.0009694451,0.00008868274,0.00029027148,0.0020073599],"genre_scores_gemma":[0.99771243,0.000002680124,0.0002654821,0.000016132872,0.00006755515,0.00075443013,0.0005450395,0.000053694323,0.00058254047],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985432,0.00019949392,0.0004957632,0.00018945363,0.0003650683,0.00020701875],"domain_scores_gemma":[0.999181,0.000096791875,0.00021794975,0.00024969017,0.00021131345,0.000043271117],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004309468,0.00018235951,0.00025641592,0.00021528377,0.00013721704,0.000035315607,0.00012977264,0.00007290781,0.000030875624],"category_scores_gemma":[0.000021574553,0.00017216062,0.000044446246,0.0004363865,0.000015952635,0.00027543923,0.000013825828,0.00009412947,0.0000013102785],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005301848,0.00006458529,0.00016966245,0.000051250052,0.00009009347,8.0344444e-7,0.00072865625,0.97339845,0.00897052,0.014400241,0.0011806113,0.0008920952],"study_design_scores_gemma":[0.0009991237,0.00076293974,0.000491545,0.000082191036,0.000060320257,0.000008732969,0.00044924614,0.96872294,0.020927286,0.000046271893,0.0071748104,0.00027458154],"about_ca_topic_score_codex":0.00039647965,"about_ca_topic_score_gemma":0.000095583375,"teacher_disagreement_score":0.68456465,"about_ca_system_score_codex":0.00035278563,"about_ca_system_score_gemma":0.00004029692,"threshold_uncertainty_score":0.7020507},"labels":[],"label_agreement":null},{"id":"W4292847831","doi":"10.2139/ssrn.4196464","title":"Multi-Criteria Renewable Auction Modeling Considering the Carbon Footprint Certification of Photovoltaic Modules","year":2022,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nexen (Canada)","funders":"","keywords":"Certification; Renewable energy; Carbon footprint; Photovoltaic system; Environmental economics; Business; Computer science; Economics; Engineering; Greenhouse gas; Electrical engineering","score_opus":0.017143968348130128,"score_gpt":0.2197904098697919,"score_spread":0.20264644152166178,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4292847831","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.513592,0.0040077777,0.4811282,0.00007225165,0.0006326654,0.00026713143,0.0000018075262,0.00013335186,0.0001648349],"genre_scores_gemma":[0.9980767,0.00084957003,0.0007894621,0.000003970956,0.000075998665,0.0000490381,0.0000049951755,0.000045732468,0.00010457536],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99807644,0.00014084058,0.00045755107,0.00015350425,0.00027911825,0.00089254417],"domain_scores_gemma":[0.99947184,0.00002664896,0.00014418799,0.00023948867,0.000084851556,0.000032994023],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014176769,0.00014182295,0.00017145368,0.00017691572,0.00029224352,0.00003530943,0.0002387111,0.000041841413,0.0000080792615],"category_scores_gemma":[0.00003533513,0.00013307978,0.00007309657,0.00034336437,0.000014749122,0.00007029274,0.000042032203,0.00093891553,5.103596e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012847976,0.00001724736,0.000047619684,0.000012886335,0.000070490685,3.9904847e-7,0.000281815,0.8684538,0.12988374,0.00022011486,0.000004044243,0.0009950041],"study_design_scores_gemma":[0.00031559722,0.00006511735,0.000016169823,0.000013003452,0.000029595738,0.00028593876,0.0012888513,0.98385715,0.010245858,0.0036695423,0.00008160459,0.00013154169],"about_ca_topic_score_codex":0.00062387116,"about_ca_topic_score_gemma":0.0004473284,"teacher_disagreement_score":0.48448464,"about_ca_system_score_codex":0.0015852507,"about_ca_system_score_gemma":0.0003106922,"threshold_uncertainty_score":0.5426836},"labels":[],"label_agreement":null},{"id":"W4293371009","doi":"10.1109/oajpe.2022.3202131","title":"A Zonal Capacity Market Model With Energy Storage for Transmission and Distribution","year":2022,"lang":"en","type":"article","venue":"IEEE Open Access Journal of Power and Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University; University of Waterloo","funders":"Independent Electricity System Operator; Natural Sciences and Engineering Research Council of Canada; Mitacs; Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Electric power transmission; Distributed generation; Transmission (telecommunications); Computer science; Transmission system; Activity-based costing; Electric power system; Mathematical optimization; Power transmission; Economics; Power (physics); Operations research; Renewable energy; Telecommunications; Electrical engineering; Engineering; Mathematics","score_opus":0.01666545183172079,"score_gpt":0.24889487481892053,"score_spread":0.23222942298719973,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293371009","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026194183,0.0007519758,0.97112876,0.0000759066,0.00020671601,0.000054882108,0.000057395933,0.000012454514,0.0015177203],"genre_scores_gemma":[0.99777836,0.00027943237,0.0014113565,0.000049007125,0.00003175034,0.000027688815,0.000013739456,0.000022888766,0.00038579086],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999207,0.00005139233,0.00025956548,0.000120024655,0.00020157396,0.00016042046],"domain_scores_gemma":[0.99957705,0.00003730257,0.000118657044,0.00007313896,0.000080404876,0.00011343512],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030147942,0.00012500455,0.00022438362,0.0000919997,0.00016860689,0.00023590795,0.00032710482,0.0000370232,0.000038853534],"category_scores_gemma":[0.000004036675,0.000105438136,0.00003365583,0.00016345673,0.000016646385,0.00088823965,0.000055757046,0.00010734307,9.995162e-9],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051137625,0.000057963338,0.00005993817,0.000044005767,0.00011995579,0.000015827061,0.00018011233,0.9670853,0.0014271257,0.0014964206,0.020427102,0.008574877],"study_design_scores_gemma":[0.0015834352,0.00035112107,0.00016217188,0.000050594244,0.00005325019,0.000352039,0.000033928518,0.957389,0.0016543497,0.0006715994,0.037455175,0.00024331338],"about_ca_topic_score_codex":0.00006426505,"about_ca_topic_score_gemma":0.000017747576,"teacher_disagreement_score":0.97158414,"about_ca_system_score_codex":0.000098637065,"about_ca_system_score_gemma":0.00005614596,"threshold_uncertainty_score":0.4299642},"labels":[],"label_agreement":null},{"id":"W4297900749","doi":"10.1109/59.918302","title":"A practical hydro, dynamic unit commitment and loading model","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; Burnaby Hospital","funders":"","keywords":"Power system simulation; Schedule; Hydroelectricity; Dynamic programming; Mathematical optimization; Unit (ring theory); Computer science; Production schedule; Engineering; Electric power system; Scheduling (production processes); Power (physics); Mathematics","score_opus":0.019011430375225007,"score_gpt":0.25362840021965627,"score_spread":0.23461696984443126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4297900749","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011758124,0.0003698063,0.981607,0.00007360158,0.0012248493,0.0003925107,0.000014019837,0.00045087765,0.0041091666],"genre_scores_gemma":[0.99716544,0.00023202263,0.001126203,0.000025314906,0.0000065572485,0.000094733354,0.0000036012386,0.000063409025,0.0012827342],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987441,0.000076170036,0.0003531807,0.00025448695,0.0002494844,0.0003225983],"domain_scores_gemma":[0.99933136,0.00009289129,0.000044173143,0.00032926598,0.000057418027,0.00014491745],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015423003,0.00023065144,0.0002641793,0.00020866381,0.00012719193,0.0001077515,0.000077138524,0.00015117593,0.000023667912],"category_scores_gemma":[0.0000034350553,0.000246122,0.000057009,0.00035503035,0.000021131247,0.00025978568,8.254395e-7,0.0002797665,0.000044399872],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013290269,0.00008039152,0.000013097127,0.000061767976,0.00011228057,0.00003037667,0.00025878102,0.9972437,0.0014886612,0.00013200102,0.00043186222,0.00013376558],"study_design_scores_gemma":[0.0003979911,0.00006149677,0.0000067641076,0.00011194016,0.00004557194,0.000441265,0.00015408649,0.9967701,0.0006616821,0.000005598009,0.0010962685,0.00024726306],"about_ca_topic_score_codex":0.000023573755,"about_ca_topic_score_gemma":0.00002731171,"teacher_disagreement_score":0.9854073,"about_ca_system_score_codex":0.00022803507,"about_ca_system_score_gemma":0.000035147386,"threshold_uncertainty_score":0.9999991},"labels":[],"label_agreement":null},{"id":"W4300559365","doi":"10.1561/3100000014","title":"Unit Commitment in Electric Energy Systems","year":2017,"lang":"en","type":"article","venue":"Foundations and Trends® in Electric Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":67,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Unit (ring theory); Energy (signal processing); Power system simulation; Computer science; Business; Electric power system; Psychology; Physics; Mathematics; Power (physics); Statistics","score_opus":0.01472480546752325,"score_gpt":0.23711929516984376,"score_spread":0.2223944897023205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4300559365","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14763659,0.1220039,0.27511212,0.0007056614,0.01716429,0.0024961948,0.000104898674,0.0030617083,0.43171465],"genre_scores_gemma":[0.9939845,0.0015355283,0.00003583994,0.0000096280655,0.00020256998,0.00045988592,0.00012826979,0.000078651006,0.0035650982],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972956,0.00022368092,0.00090089394,0.0004823376,0.00033975943,0.000757731],"domain_scores_gemma":[0.9985359,0.00013753648,0.0002836279,0.0008063249,0.0000937745,0.00014285669],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000446523,0.00040979232,0.0006104027,0.0021095923,0.0003930633,0.0006100582,0.0004510474,0.0002651921,0.000012398325],"category_scores_gemma":[0.000041801326,0.00043355528,0.000064216794,0.0019799205,0.000027221979,0.0005042317,0.000043285185,0.00025379282,0.000007862674],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004690617,0.00045744472,0.02026403,0.0003391439,0.00048189427,0.00014845231,0.00038227238,0.702884,0.0009780945,0.17937627,0.0041629327,0.090478554],"study_design_scores_gemma":[0.0012795083,0.00012558805,0.007972489,0.0001701028,0.000036156733,0.00010274036,0.000041092633,0.9615628,0.00011536649,0.00012053662,0.027885275,0.0005883507],"about_ca_topic_score_codex":0.011403062,"about_ca_topic_score_gemma":0.0032573738,"teacher_disagreement_score":0.8463479,"about_ca_system_score_codex":0.0006034989,"about_ca_system_score_gemma":0.000066806235,"threshold_uncertainty_score":0.99981165},"labels":[],"label_agreement":null},{"id":"W4301368800","doi":"10.7202/1092246ar","title":"Accès au très haut débit et développement territorial en période d’incertitude : note éditoriale","year":2022,"lang":"fr","type":"article","venue":"Canadian Journal of Regional Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Institut National de la Recherche Scientifique","funders":"","keywords":"Political science","score_opus":0.0144710353570674,"score_gpt":0.25500623915098913,"score_spread":0.24053520379392174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4301368800","genre_codex":"editorial","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.062856,0.016656136,0.08617163,0.18423383,0.64039236,0.001274393,0.00034198366,0.00009220384,0.007981474],"genre_scores_gemma":[0.97271305,0.00018248352,0.008331568,0.0003435561,0.017349735,0.000016709837,0.000007763839,0.00004900618,0.0010060954],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.995901,0.00025842275,0.00069378735,0.00031373792,0.001870183,0.0009628573],"domain_scores_gemma":[0.99745494,0.00016020615,0.00035578,0.0002606699,0.0005013945,0.0012670042],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0037962154,0.00024642894,0.00032564445,0.0007796282,0.00096159143,0.00029043548,0.0014477741,0.000098085504,0.0003364012],"category_scores_gemma":[0.00049003825,0.00028457973,0.0001485674,0.0014378262,0.0003028693,0.00096442946,0.00008907611,0.0008185685,0.000020287314],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":true,"study_design_scores_codex":[0.000051534786,0.000058114023,0.0018702843,0.00006306348,0.00010181818,0.00067904865,0.015170408,0.60929376,0.003344347,0.005686823,0.352251,0.0114298025],"study_design_scores_gemma":[0.00074361596,0.0003149697,0.0031225102,0.00017858464,0.0000469007,0.000992675,0.00022588254,0.014350457,0.000307888,0.00053149427,0.9787907,0.00039434357],"about_ca_topic_score_codex":0.03183031,"about_ca_topic_score_gemma":0.062172588,"teacher_disagreement_score":0.9098571,"about_ca_system_score_codex":0.017193662,"about_ca_system_score_gemma":0.032716256,"threshold_uncertainty_score":0.99996066},"labels":[],"label_agreement":null},{"id":"W4302379523","doi":"10.48550/arxiv.1711.04175","title":"Optimal Subhourly Electricity Resource Dispatch Under Multiple Price\\n Signals With High Renewable Generation Availability","year":2017,"lang":"","type":"preprint","venue":"arXiv (Cornell University)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"SLAC National Accelerator Laboratory; Pacific Institute for Climate Solutions; University of Victoria; California Energy Commission; U.S. Department of Energy","keywords":"Economic dispatch; Renewable energy; Computer science; Electricity; Electric power system; Optimal control; Resource (disambiguation); Interconnection; Mathematical optimization; Electricity generation; Trajectory; Power (physics); Engineering; Telecommunications; Electrical engineering; Mathematics","score_opus":0.03990896657719968,"score_gpt":0.17006920997525438,"score_spread":0.1301602433980547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4302379523","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4575907,0.00020911012,0.5380641,0.000045031553,0.0003858181,0.0013293176,0.000060735958,0.0003816336,0.0019335219],"genre_scores_gemma":[0.987436,0.0006198316,0.0034348567,0.000028155098,0.00044947446,0.000015126865,0.00040223444,0.00024054162,0.0073737623],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99306285,0.00077124144,0.0010023747,0.0030519043,0.00048708558,0.0016245389],"domain_scores_gemma":[0.9931206,0.00043840994,0.0013922487,0.003555696,0.0008633098,0.00062970683],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.0013644589,0.0014478095,0.0014676385,0.0006609289,0.0012665744,0.0006467588,0.0019695077,0.0013745608,0.0002839023],"category_scores_gemma":[0.00029352642,0.0017024722,0.0004029039,0.0014929816,0.00029073033,0.0012453578,0.000661801,0.0016494334,0.00014563388],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004147431,0.00031301813,0.010686494,0.0003576369,0.0006706192,0.00014228585,0.00023134472,0.9831236,0.0025178972,0.00060988334,0.0008467848,0.00008569566],"study_design_scores_gemma":[0.0024123408,0.0004065747,0.0036482366,0.00030456964,0.000653763,0.000020652924,0.00008184465,0.9812614,0.008385762,0.00031568127,0.0006187323,0.0018904927],"about_ca_topic_score_codex":0.005790548,"about_ca_topic_score_gemma":0.0017557547,"teacher_disagreement_score":0.5346293,"about_ca_system_score_codex":0.003119223,"about_ca_system_score_gemma":0.0007923631,"threshold_uncertainty_score":0.99992186},"labels":[],"label_agreement":null},{"id":"W4307237985","doi":"10.26443/glsars.v2i1.187","title":"Study of Legal Adaptation in China's Wind Power Development","year":2022,"lang":"en","type":"article","venue":"McGill GLSA Research Series","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Renewable energy; Wind power; China; Electricity; Electricity generation; Electricity market; Business; Energy development; Environmental economics; Energy law; Nameplate capacity; Economics; Market economy; Power (physics); Engineering; Law; Electrical engineering; Environmental law; Political science","score_opus":0.036248948055220165,"score_gpt":0.28499025713667875,"score_spread":0.24874130908145858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307237985","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9914268,0.00010140645,0.00010751693,0.00004000925,0.00015340156,0.0006430206,0.00000950051,0.000077866935,0.0074404515],"genre_scores_gemma":[0.99888986,0.0000065550644,0.0003469542,0.0000018024347,0.000005839036,0.00015686381,0.000010873383,0.000026151263,0.0005550716],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99811006,0.00027993994,0.00032026487,0.0001716514,0.0008005945,0.00031751837],"domain_scores_gemma":[0.9996112,0.00004497744,0.000027199014,0.00018938779,0.000088870045,0.000038355633],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011498886,0.000094973075,0.00015659395,0.00050236995,0.00026585383,0.000019528065,0.00020628449,0.000025351597,0.000097917764],"category_scores_gemma":[0.00006594669,0.00010563439,0.000013199253,0.0012457392,0.000019142395,0.00025792557,0.00014546639,0.00034671545,0.000005300122],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017937507,0.0005823736,0.0025237913,0.000113285394,0.00008498652,0.00011089558,0.022992013,0.96642476,0.0017566057,0.0016194591,0.00062804273,0.002984418],"study_design_scores_gemma":[0.010012724,0.010546237,0.3206755,0.00024191887,0.000026986783,0.00015402082,0.19038369,0.110742964,0.038052175,0.00044853392,0.31632388,0.0023913602],"about_ca_topic_score_codex":0.00020226024,"about_ca_topic_score_gemma":0.0005664189,"teacher_disagreement_score":0.8556818,"about_ca_system_score_codex":0.0004519829,"about_ca_system_score_gemma":0.00006575151,"threshold_uncertainty_score":0.43076456},"labels":[],"label_agreement":null},{"id":"W4310174523","doi":"10.1109/isgt-europe54678.2022.9960363","title":"AC Multi-Stage Transmission Network Expansion Planning considering a Multi-Voltage Approach","year":2022,"lang":"en","type":"article","venue":"2022 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT-Europe)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Compensation (psychology); AC power; Voltage; Transmission (telecommunications); Mathematical optimization; Computer science; Electric power system; Heuristic; Transmission system; Control theory (sociology); Power (physics); Electronic engineering; Engineering; Electrical engineering; Mathematics; Telecommunications","score_opus":0.057483140714846157,"score_gpt":0.25964845021702637,"score_spread":0.2021653095021802,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310174523","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03777864,0.0026873408,0.93788475,0.00017347398,0.0030257145,0.0018941499,0.00015273165,0.008296472,0.008106722],"genre_scores_gemma":[0.9556132,0.0010410331,0.038665302,0.0001680242,0.00018056393,0.0006809521,0.00030170774,0.0004217277,0.0029275133],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99488777,0.00046505287,0.0012648694,0.0012963944,0.0007875383,0.0012983823],"domain_scores_gemma":[0.9973835,0.00020039521,0.00046167674,0.0011381599,0.0007096855,0.0001065905],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0010377656,0.0009399803,0.0009067571,0.00089725014,0.00096463214,0.00022083115,0.0016114099,0.00025962235,0.00018106739],"category_scores_gemma":[0.00048430575,0.0009694106,0.00010440089,0.007974007,0.00031034168,0.0005428509,0.00094866345,0.0025321832,0.000056649867],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015394602,0.00043882907,0.005520383,0.0005205819,0.0003839339,0.00073438627,0.003200915,0.73706275,0.20526975,0.0036681537,0.019636793,0.02340959],"study_design_scores_gemma":[0.0017655334,0.00040925434,0.00064146094,0.000235013,0.00004592558,0.0001265948,0.002839165,0.7893741,0.024051232,0.000018174262,0.17882015,0.0016734083],"about_ca_topic_score_codex":0.000019512232,"about_ca_topic_score_gemma":0.000004976156,"teacher_disagreement_score":0.9178345,"about_ca_system_score_codex":0.0002758857,"about_ca_system_score_gemma":0.00020711125,"threshold_uncertainty_score":0.99976903},"labels":[],"label_agreement":null},{"id":"W4312253434","doi":"10.1109/tpwrs.2022.3217941","title":"Distributionally Robust Optimal Power Flow via Ellipsoidal Approximation","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Probabilistic logic; Renewable energy; Robust optimization; Computer science; Schedule; Electric power system; Upper and lower bounds; Probability distribution; Power flow; Power (physics); Engineering; Mathematics","score_opus":0.007296792219374998,"score_gpt":0.18119723446507371,"score_spread":0.17390044224569873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312253434","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034837069,0.00024285755,0.98562807,0.00004941666,0.006453167,0.00078976207,0.00040769446,0.0009333089,0.0020120472],"genre_scores_gemma":[0.9969708,0.0000086245545,0.0012164993,0.00002311627,0.000027363358,0.000661582,0.00010794054,0.00010183572,0.0008822901],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974753,0.00018758107,0.00064433063,0.00041259913,0.00078629114,0.0004938521],"domain_scores_gemma":[0.9990738,0.00007831776,0.00010606999,0.0004807851,0.00011456729,0.00014643381],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00042336038,0.00035199663,0.00033975477,0.00034799348,0.0005116691,0.000112197806,0.000312266,0.00013942482,0.00060021225],"category_scores_gemma":[0.0000033490062,0.00040954674,0.00017987302,0.0008346558,0.000027033282,0.00032397552,0.0000029732544,0.0005594219,0.0001727702],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003700155,0.00014480905,0.0000035605135,0.000045817138,0.000124849,0.00000965353,0.0003086357,0.9953181,0.00097147,0.00011977077,0.0027487255,0.0001675645],"study_design_scores_gemma":[0.0005586333,0.00022895291,0.000013589865,0.000027135256,0.00003916608,0.00021134855,0.0002010328,0.99009323,0.0013977571,0.0000046172904,0.0067644273,0.00046012906],"about_ca_topic_score_codex":0.000022708222,"about_ca_topic_score_gemma":0.000002638869,"teacher_disagreement_score":0.99348706,"about_ca_system_score_codex":0.000951311,"about_ca_system_score_gemma":0.00006650217,"threshold_uncertainty_score":0.9998356},"labels":[],"label_agreement":null},{"id":"W4313590472","doi":"10.1186/s43067-022-00067-w","title":"Optimum generation scheduling incorporating wind energy using HHO–IGWO algorithm","year":2023,"lang":"en","type":"article","venue":"Journal of Electrical Systems and Information Technology","topic":"Electric Power System Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Mitacs; University of Calgary","keywords":"Renewable energy; Power system simulation; Wind power; Scheduling (production processes); Electric power system; Mathematical optimization; Engineering; Computer science; Economic dispatch; Reliability engineering; Operations research; Operations management; Power (physics); Electrical engineering; Mathematics","score_opus":0.008811439879338249,"score_gpt":0.20747438646893648,"score_spread":0.19866294658959824,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313590472","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07719704,0.0014325585,0.9199352,0.000079738515,0.00072603574,0.00012572568,0.0000020799223,0.00029618508,0.00020539774],"genre_scores_gemma":[0.9839383,0.00044226478,0.0152590955,0.000021698927,0.00028716412,0.000005176311,0.000013824661,0.000019681016,0.0000128362235],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99837244,0.00003448029,0.0010068534,0.00007071601,0.0002568167,0.00025867924],"domain_scores_gemma":[0.9989986,0.000035321442,0.00049151527,0.0000999055,0.0003042234,0.000070436836],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048918277,0.00014366343,0.00031235855,0.0015708082,0.00012064851,0.0001239688,0.0001274695,0.0002921864,0.0000014818751],"category_scores_gemma":[0.0001133052,0.00013306626,0.0000414851,0.0020748335,0.000019882547,0.0015385495,0.000024318373,0.0002754472,0.0000059210993],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005684477,0.0000103476,0.00026484183,0.00008209154,0.00010763701,0.000011557262,0.000090161055,0.87759936,0.012754292,0.009695134,0.0009095999,0.09846927],"study_design_scores_gemma":[0.0003203034,0.0001398738,0.000021491987,0.000053856747,0.000015600644,0.0004767208,0.00007576504,0.99460477,0.0020369098,0.00013307284,0.001987245,0.00013438273],"about_ca_topic_score_codex":0.000010039607,"about_ca_topic_score_gemma":3.1725142e-7,"teacher_disagreement_score":0.9067412,"about_ca_system_score_codex":0.00019757218,"about_ca_system_score_gemma":0.000062866246,"threshold_uncertainty_score":0.54262847},"labels":[],"label_agreement":null},{"id":"W4313812644","doi":"10.1007/s11149-022-09456-5","title":"Employing gain-sharing regulation to promote forward contracting in the electricity sector","year":2023,"lang":"en","type":"article","venue":"Journal of Regulatory Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund","keywords":"Procurement; Public finance; Electricity; Industrial organization; Business; Economics; Microeconomics; Cost sharing; Public economics; Marketing; Macroeconomics","score_opus":0.01549089503280215,"score_gpt":0.22080378339418918,"score_spread":0.20531288836138703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313812644","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99031436,0.00009046141,0.008218734,0.00014991921,0.00047396612,0.0002579492,0.0000010170803,0.0000776262,0.0004159654],"genre_scores_gemma":[0.99882317,0.00004156139,0.0007335035,0.000047155125,0.00026771784,0.000006480341,0.0000015540458,0.000039562517,0.00003931373],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987537,0.000039709477,0.0006723577,0.00012167093,0.00012515641,0.00028736106],"domain_scores_gemma":[0.9992901,0.00011545432,0.00026186684,0.000201899,0.00006488257,0.00006577611],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017442139,0.0001285951,0.000260703,0.0004947202,0.00006224318,0.00009112072,0.00027517971,0.000082665734,0.000005159164],"category_scores_gemma":[0.000116960706,0.00011844902,0.00008490444,0.00057992456,0.0000057652574,0.0003994625,0.000018651654,0.00025435942,0.000013250822],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018142104,0.000007921095,0.0040690363,0.000033031523,0.000043425287,0.000008713084,0.0010537943,0.9866448,0.0028066153,0.00025385464,0.00069333677,0.0043673464],"study_design_scores_gemma":[0.0007880464,0.0001213948,0.05169113,0.00017097112,0.00003234969,0.00019561233,0.00024824595,0.93423784,0.0073861526,0.0011415527,0.0036464885,0.00034024534],"about_ca_topic_score_codex":0.0000029293233,"about_ca_topic_score_gemma":0.000014731645,"teacher_disagreement_score":0.052406974,"about_ca_system_score_codex":0.0005046018,"about_ca_system_score_gemma":0.000047007616,"threshold_uncertainty_score":0.48302108},"labels":[],"label_agreement":null},{"id":"W4317627131","doi":"10.1016/j.eneco.2023.106521","title":"Foreseeing the worst: Forecasting electricity DART spikes","year":2023,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; Group for Research in Decision Analysis; HEC Montréal","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs; HEC Montréal; Hydro-Québec","keywords":"Dart; Computer science; Spike (software development); Set (abstract data type); Predictive power; Electricity; Feature (linguistics); Operator (biology); Probabilistic forecasting; Econometrics; Machine learning; Artificial intelligence; Economics; Engineering","score_opus":0.01344774014926228,"score_gpt":0.16679983841174795,"score_spread":0.15335209826248566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317627131","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7345277,0.0008789832,0.1751517,0.00040767112,0.002525843,0.00027489208,0.000010590771,0.0025032125,0.08371938],"genre_scores_gemma":[0.99847597,0.00025186926,0.00022229574,0.00003579853,0.0002471122,0.000035576497,0.000023081117,0.000053140422,0.00065513887],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920887,0.000017202716,0.00023366518,0.00014722547,0.000043050717,0.00035000787],"domain_scores_gemma":[0.9995457,0.00012920269,0.000044942797,0.0002243025,0.000015517633,0.00004035481],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002026173,0.00012501348,0.00013163773,0.00013831806,0.00013047752,0.00006998348,0.00020696616,0.000064340056,0.000012381633],"category_scores_gemma":[0.000043514832,0.00011384629,0.000052019353,0.00045869238,0.000011864001,0.00014886243,0.000034920264,0.00009554717,0.000025834437],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000022208403,0.0000023966218,0.0011867265,0.000010204307,0.000032073116,0.0000036462357,0.00012195921,0.9774005,0.000070702125,0.0044545657,0.004045562,0.012669448],"study_design_scores_gemma":[0.000083037936,0.000009106655,0.00008434807,0.0000067515075,0.0000053594836,0.000011851149,0.000022461041,0.97495484,0.0018687757,0.00081746106,0.022005398,0.00013062358],"about_ca_topic_score_codex":0.00003694736,"about_ca_topic_score_gemma":0.0001821588,"teacher_disagreement_score":0.26394826,"about_ca_system_score_codex":0.0001435673,"about_ca_system_score_gemma":0.000017046956,"threshold_uncertainty_score":0.46425173},"labels":[],"label_agreement":null},{"id":"W4321021077","doi":"10.1109/tempr.2023.3244337","title":"Market Power Mitigation in Transmission Expansion Planning Problems","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Markets Policy and Regulation","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Junta de Andalucía","keywords":"Mathematical optimization; Electricity market; Market power; Linear programming; Plan (archaeology); Computer science; Transmission (telecommunications); Economics; Electricity; Microeconomics; Mathematics; Engineering; Telecommunications","score_opus":0.007354551351389541,"score_gpt":0.21612153823028452,"score_spread":0.20876698687889497,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4321021077","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07915063,0.00017716907,0.9096594,0.00030714498,0.00044224237,0.0002863873,0.000008838108,0.000810809,0.009157411],"genre_scores_gemma":[0.99691576,0.0004912929,0.00021526625,0.000030137486,0.000046962465,0.00007285788,0.000024476572,0.000049456583,0.0021537824],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877757,0.00011388615,0.0003427179,0.00024870347,0.00021715142,0.00029999233],"domain_scores_gemma":[0.99956864,0.0001199267,0.00004123992,0.00015748855,0.000026286223,0.00008639473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002859684,0.0001999475,0.00016726281,0.0010605092,0.00013469512,0.000035748177,0.000057802892,0.00020975064,0.000049137652],"category_scores_gemma":[0.0000052993223,0.00020599736,0.00004784307,0.001282109,0.000024681023,0.00031082073,7.1681336e-7,0.00013501779,0.000004347822],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000061668296,0.00002741056,0.000019933726,0.000071980474,0.00001890471,0.0000029828268,0.00050719513,0.94052666,0.0076642926,0.00017753,0.00060516753,0.05031628],"study_design_scores_gemma":[0.00069450366,0.000056987377,0.009133505,0.00034008146,0.000011596419,0.0000150806645,0.000032346124,0.9745632,0.01119587,0.00053915684,0.003132676,0.00028500118],"about_ca_topic_score_codex":0.000054905147,"about_ca_topic_score_gemma":0.000020339476,"teacher_disagreement_score":0.91776514,"about_ca_system_score_codex":0.00013187467,"about_ca_system_score_gemma":0.00003349661,"threshold_uncertainty_score":0.8400329},"labels":[],"label_agreement":null},{"id":"W4322576739","doi":"10.1109/oajpe.2023.3247989","title":"Learning-Assisted Variables Reduction Method for Large-Scale MILP Unit Commitment","year":2023,"lang":"en","type":"article","venue":"IEEE Open Access Journal of Power and Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Schedule; Reduction (mathematics); Mathematical optimization; Integer programming; Computer science; Linear programming; Yield (engineering); Power system simulation; Integer (computer science); Range (aeronautics); Mathematics; Electric power system; Engineering; Power (physics)","score_opus":0.0327592495225813,"score_gpt":0.3363071410573977,"score_spread":0.30354789153481637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4322576739","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013608346,0.0005468793,0.97488344,0.00020724443,0.0025877033,0.00015656115,0.000010102695,0.000099083685,0.007900643],"genre_scores_gemma":[0.97205156,0.0012485861,0.020708699,0.0000619795,0.00030692984,0.00004424047,0.000035441433,0.00008692887,0.0054556434],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896926,0.00011232138,0.00040427956,0.0001221983,0.00015602406,0.0002359403],"domain_scores_gemma":[0.99934137,0.00010135714,0.00017656332,0.00010968265,0.00017292488,0.000098079065],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090009737,0.00013103949,0.00029261602,0.00027480212,0.00012618452,0.00040963123,0.00045402488,0.00008227519,0.00003627182],"category_scores_gemma":[0.00003070399,0.00011914939,0.000059878268,0.00055110495,0.0000068598724,0.0008470714,0.000075296535,0.00013319074,0.0000016319347],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017986959,0.00009966115,0.00039407887,0.00011924899,0.00049945444,0.000019803776,0.000903736,0.87706965,0.009841752,0.0011558228,0.08881836,0.02089857],"study_design_scores_gemma":[0.0046062786,0.00075958937,0.002335874,0.00035767225,0.00026258893,0.0005397493,0.0011685283,0.5742721,0.026187068,0.001399389,0.38737667,0.0007344954],"about_ca_topic_score_codex":0.000060199196,"about_ca_topic_score_gemma":0.000025267756,"teacher_disagreement_score":0.9584432,"about_ca_system_score_codex":0.000058743615,"about_ca_system_score_gemma":0.000037822672,"threshold_uncertainty_score":0.4858771},"labels":[],"label_agreement":null},{"id":"W4323265851","doi":"10.1049/stg2.12065","title":"Fuzzy optimisation model of an incremental capacity auction formulation with greenhouse gas consideration","year":2023,"lang":"en","type":"article","venue":"IET Smart Grid","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Greenhouse gas; Renewable energy; Electricity generation; Environmental science; Environmental economics; Computer science; Mathematical optimization; Economics; Power (physics); Engineering; Mathematics","score_opus":0.022644476723291344,"score_gpt":0.21234087155121326,"score_spread":0.18969639482792192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4323265851","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8836762,0.000005469449,0.11433928,0.000026771026,0.00028763778,0.00034676385,0.00002231639,0.0006107128,0.0006848574],"genre_scores_gemma":[0.9921687,0.000015803345,0.007249673,0.000008522505,0.000100648285,0.000035755456,0.00035705097,0.000039433646,0.000024362329],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990669,0.000036483343,0.00029264175,0.00016276822,0.0002646017,0.0001766379],"domain_scores_gemma":[0.9995438,0.00002187705,0.00008528151,0.00019328416,0.00010549551,0.000050296585],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023743938,0.00013467016,0.00014469547,0.00020748006,0.000080489706,0.000029098612,0.000051079212,0.00008727506,0.0000061166866],"category_scores_gemma":[0.000016991808,0.00013961678,0.000026001238,0.00039049043,0.000015491943,0.000741992,0.000008421387,0.00008248427,0.000014416004],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024335075,0.000018524599,0.000649477,0.000048943,0.00002273185,6.0538616e-7,0.0005063198,0.9765997,0.02102857,0.00019327074,0.00054943276,0.00035811818],"study_design_scores_gemma":[0.00045425177,0.00012552054,0.001253492,0.000023114475,0.000022208524,0.000009860338,0.00003948034,0.96529967,0.032311317,0.00029961154,0.000014215896,0.00014728568],"about_ca_topic_score_codex":0.00008895315,"about_ca_topic_score_gemma":0.00026064907,"teacher_disagreement_score":0.10849256,"about_ca_system_score_codex":0.00015251555,"about_ca_system_score_gemma":0.000027627175,"threshold_uncertainty_score":0.5693407},"labels":[],"label_agreement":null},{"id":"W4363675548","doi":"10.3390/en16083335","title":"AI-Based Scheduling Models, Optimization, and Prediction for Hydropower Generation: Opportunities, Issues, and Future Directions","year":2023,"lang":"en","type":"article","venue":"Energies","topic":"Electric Power System Optimization","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; Royal Military College of Canada; Université du Québec à Chicoutimi","funders":"","keywords":"Hydropower; Scheduling (production processes); Renewable energy; Hydroelectricity; Computer science; Electricity generation; Artificial intelligence; Industrial engineering; Operations research; Mathematical optimization; Machine learning; Engineering; Power (physics); Operations management","score_opus":0.025892077739821412,"score_gpt":0.22875843985067928,"score_spread":0.20286636211085787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4363675548","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012673368,0.015035735,0.9652496,0.0022029977,0.0017026741,0.00042825355,0.00008519625,0.0020664455,0.0005557282],"genre_scores_gemma":[0.76845264,0.061382778,0.15506592,0.0004852904,0.0051429747,0.0011417404,0.0037538595,0.00038144743,0.0041933614],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993593,0.000020153408,0.00018481376,0.00017428708,0.00010212872,0.00015927789],"domain_scores_gemma":[0.99968433,0.000028426679,0.000025745261,0.00011857654,0.0000898167,0.00005309641],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012347139,0.00013271537,0.00012160961,0.0002110195,0.0002036418,0.00009894455,0.000035393834,0.00010081847,0.000009548872],"category_scores_gemma":[0.0000108391205,0.00014465708,0.000019547642,0.00029046094,0.000020763095,0.00036767023,0.000010482467,0.00005671584,5.6924847e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000023721195,0.0000035927849,0.000017925764,0.000047799098,0.00002268698,6.646696e-7,0.00016478085,0.987812,0.00013999897,0.0015367707,0.009294647,0.00095676386],"study_design_scores_gemma":[0.00023999286,0.00002345058,0.000009693904,0.000015808171,0.00002099335,0.000004130071,0.000106600026,0.95882493,0.0005209268,0.00007928368,0.04002259,0.00013162658],"about_ca_topic_score_codex":0.000011826649,"about_ca_topic_score_gemma":0.00000835706,"teacher_disagreement_score":0.8101837,"about_ca_system_score_codex":0.000039941628,"about_ca_system_score_gemma":0.000029349352,"threshold_uncertainty_score":0.5898944},"labels":[],"label_agreement":null},{"id":"W4365459721","doi":"10.1016/j.ijindorg.2023.102953","title":"Evaluating the impact of divestitures on competition: Evidence from Alberta’s wholesale electricity market","year":2023,"lang":"en","type":"article","venue":"International Journal of Industrial Organization","topic":"Electric Power System Optimization","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary; University of Alberta","funders":"","keywords":"Divestment; Restructuring; Market power; Competition (biology); Industrial organization; Electricity; Economics; Business; Asset (computer security); Electricity market; Empirical evidence; Monetary economics; Market economy; Finance; Monopoly","score_opus":0.05467947694162945,"score_gpt":0.3258646888005655,"score_spread":0.27118521185893607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4365459721","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9867951,0.00010114792,0.010188469,0.00050277397,0.001866165,0.00016921545,0.00002363137,0.000054038843,0.0002994151],"genre_scores_gemma":[0.9986001,0.00013799795,0.000114627124,0.000014083205,0.0010044379,0.0000011443443,0.000043282842,0.000025525444,0.000058763137],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983212,0.00016761967,0.0005836033,0.000093817296,0.00071630377,0.00011750233],"domain_scores_gemma":[0.99753594,0.00095135794,0.0004356907,0.00012163249,0.00091198616,0.000043380194],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063847116,0.0001246452,0.00018566832,0.00030268834,0.000049706214,0.00007980117,0.00045131554,0.00010841731,0.00030820517],"category_scores_gemma":[0.0035132628,0.00009130333,0.00008323954,0.0010542145,0.00002112367,0.0003365945,0.000031099367,0.0002711479,0.00002104422],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016093082,0.000038684226,0.02855477,0.0000040358677,0.00042596078,0.000008738219,0.00056401803,0.9328296,0.01835459,0.00011584688,0.016052095,0.0028906877],"study_design_scores_gemma":[0.0058074296,0.0026014696,0.2734778,0.0035984926,0.00031808252,0.00022410645,0.00025359174,0.59810364,0.11361307,0.0009963722,0.00019839704,0.000807542],"about_ca_topic_score_codex":0.00022484022,"about_ca_topic_score_gemma":0.000009001772,"teacher_disagreement_score":0.33472598,"about_ca_system_score_codex":0.0003723062,"about_ca_system_score_gemma":0.00019371811,"threshold_uncertainty_score":0.42059577},"labels":[],"label_agreement":null},{"id":"W4366085189","doi":"10.1016/j.renene.2023.04.052","title":"Evaluation of flexibility provided by cascading hydroelectric assets for variable renewable energy integration","year":2023,"lang":"en","type":"article","venue":"Renewable Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Mitacs","keywords":"Flexibility (engineering); Renewable energy; Hydroelectricity; Environmental economics; Environmental resource management; Environmental science; Engineering; Business; Computer science; Economics; Electrical engineering","score_opus":0.019532308152459064,"score_gpt":0.2518749483247512,"score_spread":0.23234264017229214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366085189","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0042667123,0.0016123384,0.9796897,0.000019498986,0.0006297542,0.0004355484,0.000038748516,0.0007842474,0.012523448],"genre_scores_gemma":[0.99078774,0.00022547018,0.0022620053,0.000016009188,0.00012371659,0.0005591592,0.0008465033,0.00010376513,0.0050756163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997292,0.00024757092,0.0006734098,0.00045297496,0.00076419616,0.0005698485],"domain_scores_gemma":[0.998358,0.00026561704,0.0001925727,0.00047958823,0.0006049238,0.00009926035],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.002386184,0.00028318044,0.00041173192,0.00047754202,0.00012241055,0.000057476685,0.00023156745,0.00025594607,0.000043116284],"category_scores_gemma":[0.00057485123,0.0003073551,0.000097632634,0.0024320793,0.000013513474,0.00039625945,0.000026960597,0.000063697815,0.0000024241742],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012780768,0.000026868109,0.000011533885,0.000068448295,0.00007639477,2.22991e-7,0.00003112565,0.8100602,0.14648794,0.00035613254,0.038579397,0.0042889384],"study_design_scores_gemma":[0.00046896384,0.00007404702,0.0000031705972,0.000046354282,0.000090565285,0.0000022738689,0.000011537921,0.65551543,0.33501807,0.0034547988,0.005122394,0.0001923655],"about_ca_topic_score_codex":0.015784979,"about_ca_topic_score_gemma":0.002124315,"teacher_disagreement_score":0.98652107,"about_ca_system_score_codex":0.00080731977,"about_ca_system_score_gemma":0.00031243323,"threshold_uncertainty_score":0.99993783},"labels":[],"label_agreement":null},{"id":"W4366598528","doi":"10.1088/1742-6596/2474/1/012083","title":"Calculation of Emission Factors of the Northwest Regional Grid Based on Linear Support Vector Machines","year":2023,"lang":"en","type":"article","venue":"Journal of Physics Conference Series","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"123 Certification (Canada)","funders":"","keywords":"Support vector machine; Status quo; Grid; Power grid; Regression analysis; Linear regression; Computer science; Regression; Correlation coefficient; Data mining; Power (physics); Statistics; Mathematics; Machine learning","score_opus":0.019614852140539683,"score_gpt":0.23280216198255746,"score_spread":0.21318730984201778,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366598528","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98042554,0.000016881548,0.01814876,0.0002201008,0.0007965446,0.000120219185,0.00004089818,0.000042409694,0.0001886405],"genre_scores_gemma":[0.9995896,0.0000264683,0.00017637537,0.0000040872583,0.00011795147,8.340039e-7,0.000024619998,0.000014815578,0.000045236222],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99907875,0.000036858957,0.0003763981,0.000055340228,0.00035892907,0.00009374211],"domain_scores_gemma":[0.9991252,0.00007192031,0.00033042204,0.00013545174,0.00030347612,0.00003352066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011730829,0.00010646065,0.0002193966,0.00008609782,0.000032079293,0.000008816203,0.00014953679,0.000045929268,0.000012634919],"category_scores_gemma":[0.000051785715,0.00007269688,0.00010864963,0.00040803698,0.000034634257,0.00018742903,0.00001123096,0.00013354288,8.952024e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011573795,0.00008786052,0.060049344,0.0003888372,0.00010798221,0.0000039031934,0.0016558418,0.8533974,0.07695493,0.0016061871,0.0014681137,0.004163856],"study_design_scores_gemma":[0.00050405215,0.00043529697,0.13921598,0.0005735858,0.00005917202,0.0000076030033,0.00012829459,0.26191035,0.59608936,0.00043188053,0.00043165174,0.00021273628],"about_ca_topic_score_codex":0.000012818187,"about_ca_topic_score_gemma":0.00000776281,"teacher_disagreement_score":0.59148705,"about_ca_system_score_codex":0.000031395266,"about_ca_system_score_gemma":0.00013772903,"threshold_uncertainty_score":0.29644927},"labels":[],"label_agreement":null},{"id":"W4376467336","doi":"10.4337/9781847204356.00019","title":"Index","year":2006,"lang":"en","type":"paratext","venue":"Edward Elgar Publishing eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Index (typography); Mathematics; Computer science; World Wide Web","score_opus":0.006712368829950057,"score_gpt":0.1949718477203177,"score_spread":0.18825947889036765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4376467336","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00005561362,0.0018708969,0.056515317,0.000040829225,0.011947394,0.0004299621,0.00008433378,0.0011050835,0.92795056],"genre_scores_gemma":[0.05842501,0.000058398025,0.0012665616,0.0001992822,0.0052013574,0.00020305165,0.0019383844,0.00067589176,0.93203205],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99721724,0.00008650122,0.0006996014,0.00052645005,0.0006658923,0.0008042893],"domain_scores_gemma":[0.9986079,0.00008874819,0.00019682398,0.0007531555,0.00018546493,0.0001679082],"candidate_categories":["metaepi_narrow","scholarly_communication","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0004241042,0.00062396936,0.00065171707,0.000676457,0.00011561299,0.0023591032,0.0009099646,0.001231397,0.0004389876],"category_scores_gemma":[0.00008786205,0.00069536496,0.00018784916,0.0002869315,0.00003406241,0.00075815467,0.000108990054,0.001505687,0.002403694],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000023269106,0.0000060514717,0.000010508825,0.00024893257,0.00009490088,0.000008467965,0.00008809074,0.030427095,0.000025608302,0.00007483719,0.96488357,0.004129626],"study_design_scores_gemma":[0.000294565,0.000015910253,0.000022190647,0.00023290433,0.000031219006,0.000018927636,0.0000061699166,0.0117430305,0.0003207691,0.000062295425,0.98649246,0.00075958524],"about_ca_topic_score_codex":0.00030475899,"about_ca_topic_score_gemma":0.00008695674,"teacher_disagreement_score":0.058369394,"about_ca_system_score_codex":0.000567557,"about_ca_system_score_gemma":0.00021499816,"threshold_uncertainty_score":0.99954975},"labels":[],"label_agreement":null},{"id":"W4376468144","doi":"10.4337/9781847205513.00023","title":"Index","year":2007,"lang":"en","type":"paratext","venue":"Edward Elgar Publishing eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Index (typography); Computer science; World Wide Web","score_opus":0.009626945342920372,"score_gpt":0.21678760285666016,"score_spread":0.20716065751373977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4376468144","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00005044934,0.0018976551,0.10750234,0.000030820927,0.014331298,0.00041889888,0.00004531442,0.0010094999,0.8747137],"genre_scores_gemma":[0.06497996,0.00015968876,0.0024227956,0.00051403703,0.007003239,0.00015050334,0.0012560834,0.00091296603,0.92260075],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99695385,0.00007110616,0.0007429779,0.0005279241,0.0007654683,0.0009387067],"domain_scores_gemma":[0.9984079,0.0001324396,0.00019673521,0.00078085175,0.00022336323,0.0002587197],"candidate_categories":["metaepi_narrow","scholarly_communication","research_integrity","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0008608035,0.0006230926,0.0006472558,0.0009450705,0.00011478153,0.0019428874,0.00097116036,0.0014565169,0.00070191745],"category_scores_gemma":[0.00015855348,0.0006944808,0.00018551383,0.00035649267,0.00003789929,0.000759789,0.00012052657,0.0018635682,0.0031768559],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000049403316,0.0000057912002,0.00000857393,0.00027248124,0.00013984497,0.0000143675725,0.00023231542,0.009136201,0.000029502879,0.00009844977,0.97849184,0.01156568],"study_design_scores_gemma":[0.00029638296,0.000020010904,0.0000150231435,0.00026506942,0.00002906484,0.00002798144,0.00001618331,0.0065174703,0.000538085,0.000039547267,0.9914712,0.00076403405],"about_ca_topic_score_codex":0.00010978508,"about_ca_topic_score_gemma":0.00005434127,"teacher_disagreement_score":0.10507955,"about_ca_system_score_codex":0.0006314992,"about_ca_system_score_gemma":0.0002216217,"threshold_uncertainty_score":0.9998398},"labels":[],"label_agreement":null},{"id":"W4376603244","doi":"10.32920/22817579.v1","title":"Learning-Assisted Variables Reduction Method for Large-Scale MILP Unit Commitment","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Schedule; Reduction (mathematics); Mathematical optimization; Integer programming; Power system simulation; Computer science; Yield (engineering); Linear programming; Integer (computer science); Range (aeronautics); Mathematics; Engineering; Electric power system; Power (physics)","score_opus":0.031014481760673097,"score_gpt":0.2861809424050283,"score_spread":0.25516646064435516,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4376603244","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00031339502,0.00020176433,0.9869728,0.00014294281,0.0030426285,0.0012780812,0.000053959917,0.0026905918,0.0053038197],"genre_scores_gemma":[0.03386255,0.00042479043,0.90065914,0.00002536083,0.0007132955,0.00166254,0.0030838668,0.0005007516,0.059067685],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99820334,0.00017881209,0.0005137163,0.0004610034,0.00021828439,0.0004248602],"domain_scores_gemma":[0.9989538,0.00019177218,0.0001328543,0.0004683003,0.0001712768,0.00008198164],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010237107,0.00034361664,0.00046765828,0.00030919013,0.000114789786,0.000099478864,0.0002469482,0.00049884076,0.000074934636],"category_scores_gemma":[0.00008327671,0.00037175894,0.00015677974,0.00039034095,0.000005648105,0.000060088096,0.00015397096,0.0005617279,0.00005589488],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011925603,0.0000417392,0.00005273655,0.0008440944,0.00034437308,0.0000010230209,0.00043444385,0.9699913,0.0007686478,0.000759899,0.024895653,0.0018541305],"study_design_scores_gemma":[0.0004495083,0.000057539564,0.00010840906,0.0001657941,0.00015058399,0.0000092687915,0.0002771758,0.9698215,0.002290799,0.0007779054,0.025462922,0.00042857192],"about_ca_topic_score_codex":0.000114389404,"about_ca_topic_score_gemma":0.000062374056,"teacher_disagreement_score":0.08631366,"about_ca_system_score_codex":0.00032595402,"about_ca_system_score_gemma":0.00006208328,"threshold_uncertainty_score":0.99987346},"labels":[],"label_agreement":null},{"id":"W4376603245","doi":"10.32920/22817579","title":"Learning-Assisted Variables Reduction Method for Large-Scale MILP Unit Commitment","year":2023,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Schedule; Reduction (mathematics); Mathematical optimization; Integer programming; Yield (engineering); Computer science; Linear programming; Power system simulation; Integer (computer science); Range (aeronautics); Mathematics; Engineering; Electric power system; Power (physics)","score_opus":0.031014481760673097,"score_gpt":0.2861809424050283,"score_spread":0.25516646064435516,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4376603245","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00031339502,0.00020176433,0.9869728,0.00014294281,0.0030426285,0.0012780812,0.000053959917,0.0026905918,0.0053038197],"genre_scores_gemma":[0.03386255,0.00042479043,0.90065914,0.00002536083,0.0007132955,0.00166254,0.0030838668,0.0005007516,0.059067685],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99820334,0.00017881209,0.0005137163,0.0004610034,0.00021828439,0.0004248602],"domain_scores_gemma":[0.9989538,0.00019177218,0.0001328543,0.0004683003,0.0001712768,0.00008198164],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010237107,0.00034361664,0.00046765828,0.00030919013,0.000114789786,0.000099478864,0.0002469482,0.00049884076,0.000074934636],"category_scores_gemma":[0.00008327671,0.00037175894,0.00015677974,0.00039034095,0.000005648105,0.000060088096,0.00015397096,0.0005617279,0.00005589488],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011925603,0.0000417392,0.00005273655,0.0008440944,0.00034437308,0.0000010230209,0.00043444385,0.9699913,0.0007686478,0.000759899,0.024895653,0.0018541305],"study_design_scores_gemma":[0.0004495083,0.000057539564,0.00010840906,0.0001657941,0.00015058399,0.0000092687915,0.0002771758,0.9698215,0.002290799,0.0007779054,0.025462922,0.00042857192],"about_ca_topic_score_codex":0.000114389404,"about_ca_topic_score_gemma":0.000062374056,"teacher_disagreement_score":0.08631366,"about_ca_system_score_codex":0.00032595402,"about_ca_system_score_gemma":0.00006208328,"threshold_uncertainty_score":0.99987346},"labels":[],"label_agreement":null},{"id":"W4376868896","doi":"10.1016/j.eneco.2023.106721","title":"The value of electricity storage arbitrage on day-ahead markets across Europe","year":2023,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"Service Public de Wallonie; International Business Machines Corporation","keywords":"Arbitrage; Bidding; Value (mathematics); Futures contract; Electricity; Electricity market; Economics; Grid; Microeconomics; Business; Econometrics; Environmental economics; Computer science; Financial economics; Mathematics; Engineering; Electrical engineering","score_opus":0.005675840195738112,"score_gpt":0.19390869369525027,"score_spread":0.18823285349951216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4376868896","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95368844,0.0003249528,0.011727832,0.00008609014,0.0013505337,0.00011363551,0.000029499235,0.00048458902,0.032194432],"genre_scores_gemma":[0.997047,0.0013597221,0.00004495706,0.00003940495,0.00010108178,0.000015782824,0.00002158206,0.00006432005,0.0013061473],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990283,0.00006772402,0.00031268684,0.00017150704,0.00006170655,0.00035802604],"domain_scores_gemma":[0.9992233,0.0002590368,0.000078708516,0.0003641116,0.0000264581,0.000048365684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005193443,0.00014489304,0.00017770925,0.00007885529,0.000106312255,0.000044829205,0.00026753932,0.00007527084,0.000005883634],"category_scores_gemma":[0.00006703714,0.00013501434,0.000055539123,0.0004406599,0.000021539987,0.00007956514,0.00003420765,0.00013618926,0.000029262696],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019731,0.000013942579,0.00023411043,0.000017218077,0.00008125375,0.0000053386634,0.00013426902,0.97354037,0.0004289209,0.013200868,0.0041956147,0.008128373],"study_design_scores_gemma":[0.00019039006,0.000036893016,0.0017236279,0.0000098716,0.000005069818,0.0000028428742,0.000011277824,0.9419045,0.011032134,0.0001912218,0.044720832,0.00017132715],"about_ca_topic_score_codex":0.000023528133,"about_ca_topic_score_gemma":0.00005096526,"teacher_disagreement_score":0.043358568,"about_ca_system_score_codex":0.00013416035,"about_ca_system_score_gemma":0.000027036402,"threshold_uncertainty_score":0.5505725},"labels":[],"label_agreement":null},{"id":"W4379742332","doi":"10.1016/j.enpol.2023.113647","title":"Market failure or politics? Understanding the motives behind regulatory actions to address surging electricity prices","year":2023,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Politics; Electricity; Electricity market; Economics; Market failure; Public economics; Industrial organization; Market economy; Microeconomics; Political science; Law; Engineering","score_opus":0.026623619119309067,"score_gpt":0.2581394586327687,"score_spread":0.23151583951345964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379742332","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1591797,0.0008012183,0.5593333,0.012654532,0.0025684019,0.001434574,0.00015055775,0.0087039415,0.25517377],"genre_scores_gemma":[0.99195987,0.00007951409,0.00013570761,0.00012504139,0.00056429184,0.000052749525,0.000012185391,0.0000668576,0.0070038065],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998629,0.00008345112,0.00022842585,0.00020783981,0.00024529538,0.00060602825],"domain_scores_gemma":[0.99913156,0.00032888103,0.00004883637,0.00032192367,0.00003347295,0.00013533182],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023837209,0.00019299974,0.00017339458,0.0007159197,0.00033584255,0.00010658439,0.0002511772,0.00009833658,0.000047297613],"category_scores_gemma":[0.0001691318,0.00015560442,0.00005788715,0.0020310483,0.00002615637,0.00019638511,0.000052688407,0.00014546055,0.000017902468],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028707731,0.000031919048,0.00037033684,0.00013104266,0.00041242872,0.000027179492,0.005276341,0.59764713,0.0025596574,0.2270237,0.1650423,0.0014492836],"study_design_scores_gemma":[0.0018617501,0.00027546685,0.028598042,0.00053357397,0.00021429002,0.00022160956,0.0071179927,0.6198989,0.02550141,0.009110182,0.30367613,0.0029906635],"about_ca_topic_score_codex":0.00036242278,"about_ca_topic_score_gemma":0.00043818445,"teacher_disagreement_score":0.8327801,"about_ca_system_score_codex":0.00074380153,"about_ca_system_score_gemma":0.00012017465,"threshold_uncertainty_score":0.6345364},"labels":[],"label_agreement":null},{"id":"W4382201310","doi":"10.2139/ssrn.4492039","title":"Do Electricity Markets Promote Decarbonization? Evidence From State Level Data in the United States","year":2023,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Quest University Canada","funders":"","keywords":"Electricity; State (computer science); Business; Natural resource economics; Economics; Engineering; Computer science; Electrical engineering","score_opus":0.032410237280598095,"score_gpt":0.26550718908301635,"score_spread":0.23309695180241824,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382201310","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7687083,0.0063083675,0.22308894,0.00070837326,0.00025874484,0.00047068606,0.000054122207,0.0003372716,0.00006521683],"genre_scores_gemma":[0.9725097,0.026523042,0.00019670556,0.00004238403,0.00011174532,0.0000154409,0.00039173945,0.00006440548,0.00014486909],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99618906,0.00040627096,0.000521854,0.0003227298,0.000563881,0.001996203],"domain_scores_gemma":[0.9985435,0.0004724969,0.00012994534,0.00067800947,0.00011321361,0.000062807936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0048016054,0.00023949092,0.00021869506,0.0005617832,0.00015163576,0.00022356145,0.0013162772,0.00008410605,0.000010405803],"category_scores_gemma":[0.0004680226,0.00019472867,0.00003652381,0.0038063799,0.000018617975,0.0006250646,0.00008019793,0.0016289066,0.00004129225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027338916,0.00019168554,0.036862664,0.00012988204,0.0012177756,0.00018643653,0.008451331,0.8769471,0.0023624983,0.0018965991,0.011365479,0.060115173],"study_design_scores_gemma":[0.00062064425,0.00010036364,0.01134617,0.00016753799,0.0000495869,0.00014355012,0.00050876994,0.9604074,0.00021437854,0.025247628,0.0008175109,0.00037650837],"about_ca_topic_score_codex":0.0004986941,"about_ca_topic_score_gemma":0.0017235058,"teacher_disagreement_score":0.22289224,"about_ca_system_score_codex":0.00095339504,"about_ca_system_score_gemma":0.0007344447,"threshold_uncertainty_score":0.7940805},"labels":[],"label_agreement":null},{"id":"W4382312876","doi":"10.1007/s10287-023-00455-1","title":"Flexible supply meets flexible demand: prosumer impact on strategic hydro operations","year":2023,"lang":"en","type":"article","venue":"Computational Management Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Division of Civil, Mechanical and Manufacturing Innovation; HEC Montréal; Energimyndigheten; Stockholms Universitet; National Science Foundation","keywords":"Arbitrage; Computer science; Cournot competition; Electricity; Flexibility (engineering); Environmental economics; Economics; Microeconomics; Finance; Electrical engineering","score_opus":0.01823420784807351,"score_gpt":0.27793774082819955,"score_spread":0.25970353298012605,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382312876","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39261478,0.00016990815,0.48443767,0.0008084843,0.0015599472,0.00214088,0.00003866921,0.004000491,0.11422916],"genre_scores_gemma":[0.9942435,0.000021505659,0.0044524865,0.00005781663,0.000032948214,0.00007770177,0.0000786403,0.000021507485,0.0010139205],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99831516,0.000020470832,0.00023977808,0.00034802817,0.00067089166,0.000405693],"domain_scores_gemma":[0.99952954,0.00004605909,0.000024936124,0.00021899489,0.00007807388,0.000102369886],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004889149,0.0001680046,0.000118323616,0.00072269235,0.00032538248,0.00028445723,0.0003735221,0.000026548189,0.00005936256],"category_scores_gemma":[0.000010079342,0.00015588185,0.000041773434,0.002997412,0.000072694886,0.0004915812,0.000065723776,0.000075901546,0.0007142454],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000027287156,0.000018453016,0.00015071403,0.0000285999,0.000021601929,0.0000055441765,0.000059951282,0.96586883,0.00019799372,0.031244703,0.0019339147,0.0004669622],"study_design_scores_gemma":[0.00021654644,0.000053988573,0.012196283,0.000036445952,0.000008559067,0.0000034547338,0.000030861367,0.98299706,0.00044783312,0.003706417,0.00012452624,0.00017802193],"about_ca_topic_score_codex":0.000006429401,"about_ca_topic_score_gemma":0.00000137815,"teacher_disagreement_score":0.6016287,"about_ca_system_score_codex":0.00023670887,"about_ca_system_score_gemma":0.00006509335,"threshold_uncertainty_score":0.9180418},"labels":[],"label_agreement":null},{"id":"W4382459518","doi":"10.1515/9780773552333-013","title":"Privatizing Electricity in British Columbia","year":2017,"lang":"en","type":"book-chapter","venue":"McGill-Queen's University Press eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Geography; Archaeology; History; Engineering; Electrical engineering","score_opus":0.008826481558913184,"score_gpt":0.17274944020632463,"score_spread":0.16392295864741144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382459518","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00006920316,0.000011632114,0.0007745095,0.0000052723212,0.00029999556,0.00072887633,0.00018497239,0.0006000611,0.9973255],"genre_scores_gemma":[0.022475976,0.00039931844,0.00033526283,0.000014813615,0.000069578804,0.0000033149415,0.000055538403,0.00015784692,0.97648835],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.998167,0.000044070497,0.0003567895,0.00055701216,0.00034511444,0.00053002214],"domain_scores_gemma":[0.99868494,0.000061985294,0.00025663993,0.00072128605,0.00012955676,0.00014557544],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014492903,0.00036082728,0.00064517197,0.00026384683,0.00038158603,0.00025975137,0.00071724853,0.00070281996,0.000031841806],"category_scores_gemma":[0.000027327122,0.0007539116,0.00016166654,0.000022124868,0.00006704762,0.00024124872,0.00021461875,0.0008195297,0.000009534951],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028055153,0.00029688276,0.0018150965,0.007309601,0.0049156817,0.02170501,0.0010790316,0.028769081,0.00037853158,0.6217463,0.18151852,0.13018568],"study_design_scores_gemma":[0.0008427348,0.000043538206,0.00015517887,0.00078729383,0.00011114541,0.000020611791,0.000004240557,0.0017057215,0.00009589063,0.00024815768,0.99503106,0.00095444336],"about_ca_topic_score_codex":0.017413111,"about_ca_topic_score_gemma":0.00070120854,"teacher_disagreement_score":0.8135125,"about_ca_system_score_codex":0.0010083149,"about_ca_system_score_gemma":0.000051997682,"threshold_uncertainty_score":0.9994912},"labels":[],"label_agreement":null},{"id":"W4382929299","doi":"10.1016/j.tej.2023.107288","title":"Impact of multiyear rate plans on power distributor productivity: Evidence from Alberta","year":2023,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Revenue; Economics; Incentive; Attrition; Empirical evidence; Industrial organization; Operations management; Natural resource economics; Microeconomics; Macroeconomics; Finance","score_opus":0.014617434082529647,"score_gpt":0.24963377420410104,"score_spread":0.2350163401215714,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382929299","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98738563,0.00026905542,0.011180778,0.00022664819,0.00037224538,0.00021732716,0.00003374988,0.00013055452,0.00018400516],"genre_scores_gemma":[0.9993369,0.00021374608,0.000029217397,0.000006238061,0.00017012164,0.0000053872823,0.000008932464,0.00003465475,0.00019481918],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9985759,0.00021686472,0.00032452817,0.00015658935,0.0003152471,0.00041081762],"domain_scores_gemma":[0.99847794,0.0008715743,0.00014527864,0.00032357138,0.00009655783,0.00008509783],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00080800493,0.00018267483,0.0002535493,0.00018994228,0.00012548795,0.00006554174,0.00034956678,0.00006950191,0.0000577215],"category_scores_gemma":[0.000880228,0.00012264223,0.00013862623,0.0012251708,0.00002022456,0.0002252118,0.000020652098,0.0005105171,0.00010701739],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000504849,0.00016908691,0.04072668,0.000038248076,0.0010615181,0.00005097798,0.0031618823,0.73431057,0.17382976,0.000045371264,0.04176389,0.004337156],"study_design_scores_gemma":[0.0013081058,0.0014428794,0.48077643,0.0005170459,0.00016776944,0.00022095407,0.000036468864,0.436193,0.07759084,0.00053444336,0.00041451768,0.00079755014],"about_ca_topic_score_codex":0.00038335877,"about_ca_topic_score_gemma":0.000045387125,"teacher_disagreement_score":0.44004974,"about_ca_system_score_codex":0.0003034886,"about_ca_system_score_gemma":0.000088801506,"threshold_uncertainty_score":0.50012046},"labels":[],"label_agreement":null},{"id":"W4382935376","doi":"10.1109/eem58374.2023.10161787","title":"Challenges and opportunities of flexibility markets related to operational planning","year":2023,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Flexibility (engineering); Risk analysis (engineering); Stakeholder; Industrial organization; Business; Electric power system; Grid; Electricity; Identification (biology); Key (lock); Environmental economics; Computer science; Computer security; Economics; Engineering; Power (physics)","score_opus":0.0748788374833109,"score_gpt":0.27403180646324954,"score_spread":0.19915296897993864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382935376","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.697777,0.0042790426,0.0061478964,0.0011184542,0.0003264279,0.0003742628,0.000008568223,0.0012715323,0.28869683],"genre_scores_gemma":[0.99765867,0.0005415713,0.0005110551,0.00001254472,0.0000060358325,0.000010119501,0.000011719077,0.000010777316,0.001237481],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995801,0.000018484894,0.0001507078,0.000083563216,0.00008071224,0.000086418935],"domain_scores_gemma":[0.99978876,0.000052679126,0.000008783604,0.00008283447,0.000029651837,0.000037292324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026235182,0.000053255066,0.00008465308,0.00011287071,0.000015489806,0.000006692067,0.000033746994,0.000037005833,0.000030506528],"category_scores_gemma":[0.000030196577,0.000053024563,0.0000081607395,0.00010628934,0.0000068175145,0.00007719699,0.000016619468,0.000029894016,0.0000075614594],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044558696,0.00003307475,0.0017890088,0.0008989011,0.00025692102,0.000031243242,0.014139287,0.80168587,0.0038818186,0.05759292,0.018376889,0.10126949],"study_design_scores_gemma":[0.0003761358,0.000084312,0.07765345,0.00014916058,0.000011008083,0.00001990261,0.0013241016,0.912766,0.0025480108,0.0006969921,0.0040439214,0.00032699454],"about_ca_topic_score_codex":0.0000012336155,"about_ca_topic_score_gemma":0.0000013054245,"teacher_disagreement_score":0.2998817,"about_ca_system_score_codex":0.000014440825,"about_ca_system_score_gemma":0.000008919106,"threshold_uncertainty_score":0.21622789},"labels":[],"label_agreement":null},{"id":"W4384833588","doi":"10.1109/fes57669.2023.10183258","title":"Multi-objective generation and transmission expansion planning: An economic and technical viewpoint","year":2023,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Computer science; Transmission (telecommunications); Telecommunications","score_opus":0.021060661608962177,"score_gpt":0.2540373224304729,"score_spread":0.23297666082151072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4384833588","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5722616,0.0006593939,0.42497963,0.00007412317,0.00014366108,0.00032069618,0.000002093955,0.000983603,0.0005752485],"genre_scores_gemma":[0.98998016,0.00038958184,0.009428473,0.000014020275,0.000043009866,0.000021562097,0.000030740466,0.000024322046,0.00006810272],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994975,0.000022572682,0.00014545492,0.00017605041,0.000042876134,0.00011557765],"domain_scores_gemma":[0.9998125,0.000018748184,0.000012359946,0.00008031143,0.0000081976095,0.00006787944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014160939,0.00009242894,0.00010301424,0.000115268944,0.00005230866,0.000031540116,0.000027327998,0.00008473325,0.000008268444],"category_scores_gemma":[0.000004778113,0.00008619508,0.000010146264,0.00009012192,0.000009039297,0.00019700664,0.000009528688,0.000062089486,0.0000084242865],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017063454,0.000027829496,0.00081230054,0.00010323389,0.000028748607,0.000009701745,0.0019600196,0.35280028,0.59612066,0.0002702685,0.0027833823,0.045066502],"study_design_scores_gemma":[0.00025959848,0.00005533057,0.0049357866,0.000017511868,0.0000055512423,0.000020034966,0.00004110327,0.984296,0.010025737,0.00001490645,0.0002133424,0.0001150765],"about_ca_topic_score_codex":0.000010380014,"about_ca_topic_score_gemma":0.00001344187,"teacher_disagreement_score":0.6314957,"about_ca_system_score_codex":0.000051554594,"about_ca_system_score_gemma":0.000008251641,"threshold_uncertainty_score":0.35149333},"labels":[],"label_agreement":null},{"id":"W4385364445","doi":"10.59962/9780774867535-011","title":"Charlie Wing and the Alberta Liquor Control Board","year":2022,"lang":"en","type":"book-chapter","venue":"University of British Columbia Press eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wing; Aeronautics; Engineering; Aerospace engineering","score_opus":0.004702056673324751,"score_gpt":0.13511202800048155,"score_spread":0.13040997132715682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385364445","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00019266095,0.0017963635,0.00075634563,0.000012086426,0.00023496909,0.0008145981,0.00022759395,0.0001404247,0.99582493],"genre_scores_gemma":[0.041038368,0.00091004866,0.000097159544,0.000030821888,0.000049116938,0.0000030774415,0.000023348717,0.00007576366,0.9577723],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990761,0.000045075205,0.0001959786,0.00025392824,0.00024088201,0.00018802001],"domain_scores_gemma":[0.99928254,0.00017327754,0.00014033291,0.00027489627,0.00006508178,0.00006387886],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014078367,0.00013717098,0.00046354142,0.000036828853,0.000202884,0.00009947248,0.00032736763,0.00018536423,0.0004595099],"category_scores_gemma":[0.000009873642,0.00028128354,0.00013130251,0.0000068088693,0.00020905261,0.00007496122,0.00013777462,0.00035135171,0.0000025526213],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011438145,0.00010519689,0.0002088578,0.0051614908,0.011535022,0.0022756206,0.011109165,0.020544538,0.00010270961,0.12631488,0.61893547,0.20256324],"study_design_scores_gemma":[0.004421728,0.00006574429,0.000058048703,0.0004431511,0.0005100788,0.00011021335,0.000045849276,0.011628118,0.000001134128,0.00036511428,0.9817837,0.0005671227],"about_ca_topic_score_codex":0.090128064,"about_ca_topic_score_gemma":0.050831426,"teacher_disagreement_score":0.36284825,"about_ca_system_score_codex":0.00010161424,"about_ca_system_score_gemma":0.000032813146,"threshold_uncertainty_score":0.99996394},"labels":[],"label_agreement":null},{"id":"W4385689550","doi":"10.1155/2023/9835024","title":"Retracted: An Algorithm for Optimal Allocation of Water Resources in Receiving Areas Based on Adaptive Decreasing Inertia Weights","year":2023,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":true,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Inertia; Computer science; Optimal allocation; Mathematical optimization; Algorithm; Operations research; Engineering; Mathematics","score_opus":0.007941152942972887,"score_gpt":0.22502894115960856,"score_spread":0.21708778821663566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385689550","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6746287,0.000031670756,0.32487464,0.00002180779,0.00018665577,0.0001854452,0.000008021455,0.000046808535,0.000016297354],"genre_scores_gemma":[0.9139345,0.00003325311,0.08580698,0.00000528101,0.00006513294,0.000012146912,0.000104111954,0.000034745335,0.0000038075602],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987167,0.000041513944,0.0006660887,0.00011801573,0.00027495917,0.00018268482],"domain_scores_gemma":[0.9992474,0.0001385147,0.0002176933,0.00008968379,0.00025105226,0.000055704688],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044545584,0.00012644878,0.00023759528,0.00059069536,0.00002994406,0.000011034172,0.00008438119,0.00010010662,0.0000033591234],"category_scores_gemma":[0.000038029833,0.000111194255,0.000067202614,0.00044847437,0.000009238741,0.00057784823,5.0028643e-7,0.00016797599,5.1014837e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023135482,0.00003939941,0.00037320436,0.00005024537,0.000018840305,0.000008193602,0.0022105726,0.96376914,0.015625844,0.000009222481,0.000003826964,0.017660175],"study_design_scores_gemma":[0.0014133803,0.0005105707,0.083196424,0.00050614594,0.00003832761,0.0000032286478,0.0003516587,0.8675063,0.046127744,0.00014364856,0.000047115904,0.00015543865],"about_ca_topic_score_codex":0.000007201208,"about_ca_topic_score_gemma":0.000038125414,"teacher_disagreement_score":0.23930588,"about_ca_system_score_codex":0.00011600576,"about_ca_system_score_gemma":0.000023891906,"threshold_uncertainty_score":0.45343703},"labels":[],"label_agreement":null},{"id":"W4385722739","doi":"10.59962/9780774824187-006","title":"1 The Nexus of Hydroelectricity in Quebec","year":2013,"lang":"en","type":"book-chapter","venue":"University of British Columbia Press eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Nexus (standard); Hydroelectricity; Political science; Engineering; Electrical engineering","score_opus":0.005632196483713418,"score_gpt":0.13944588920628953,"score_spread":0.13381369272257612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385722739","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013188268,0.0013706258,0.0006458747,0.0000014491661,0.00014417172,0.0005927607,0.0000759811,0.00009875622,0.99575156],"genre_scores_gemma":[0.07046437,0.00053794065,0.00009875262,0.0000019414806,0.000017290386,0.0000010061575,0.000011477262,0.00004400825,0.92882323],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990122,0.00002818871,0.00030062467,0.00019677369,0.00023912147,0.000223122],"domain_scores_gemma":[0.9992084,0.00009268251,0.0001967577,0.00030748572,0.00014488748,0.00004978022],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010224632,0.000122316,0.00039924218,0.0000692489,0.00006150666,0.000065543456,0.0004337723,0.0003013122,0.000077028344],"category_scores_gemma":[0.000008955764,0.00025313042,0.00011044832,0.00002143948,0.00014178302,0.00007981861,0.00007476215,0.00029552152,0.0000046876266],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000767496,0.000097337106,0.00015705072,0.0023736174,0.0015113314,0.0005306774,0.001910359,0.017698301,0.0002580065,0.016061677,0.42237672,0.5369482],"study_design_scores_gemma":[0.0030658443,0.000269785,0.0013716429,0.0034530475,0.00040211825,0.00009003262,0.000121810444,0.062611125,0.00014545256,0.0037181189,0.9228267,0.0019242932],"about_ca_topic_score_codex":0.5512211,"about_ca_topic_score_gemma":0.7239634,"teacher_disagreement_score":0.53502387,"about_ca_system_score_codex":0.00020767108,"about_ca_system_score_gemma":0.00007411825,"threshold_uncertainty_score":0.9999921},"labels":[],"label_agreement":null},{"id":"W4386091132","doi":"10.1016/j.eneco.2023.106945","title":"Pricing inconsistency between the futures and Financial Transmission Right markets in North America","year":2023,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; Group for Research in Decision Analysis; HEC Montréal","funders":"","keywords":"Futures contract; Economics; Financial economics; Econometrics; Financial market; Derivatives market; Sample (material); Finance","score_opus":0.003436611625445738,"score_gpt":0.1601080938993591,"score_spread":0.15667148227391337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386091132","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98648524,0.0004596133,0.008999641,0.00011331997,0.00023819943,0.000078813486,0.0000056547865,0.00016320862,0.003456284],"genre_scores_gemma":[0.9975018,0.0019822188,0.00023075668,0.000035372243,0.0001201406,0.000015149707,0.00002922034,0.00002218398,0.00006315741],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994383,0.000026310388,0.00020951197,0.00012637414,0.000026163578,0.00017333106],"domain_scores_gemma":[0.99971014,0.000108082735,0.00002988004,0.00011285274,0.0000041794938,0.000034887897],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000095695475,0.00009821617,0.00014156254,0.0001256281,0.00006744032,0.000021931777,0.00009175258,0.000057921246,0.0000074987215],"category_scores_gemma":[0.0000120231025,0.00008439103,0.000022610979,0.0003008483,0.000014260519,0.000080745194,0.000015797963,0.00008005096,0.0000026843957],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001795579,0.000011285437,0.06447157,0.000078916724,0.000057997826,0.000015380425,0.002321524,0.39296034,0.000031565203,0.00041497176,0.0019998038,0.5376187],"study_design_scores_gemma":[0.0003865593,0.000022868122,0.14750805,0.000025923979,0.000015000903,0.0000045656957,0.00006506494,0.6950089,0.0004022703,0.00029365468,0.15593989,0.00032725843],"about_ca_topic_score_codex":0.000048486425,"about_ca_topic_score_gemma":0.00046628973,"teacher_disagreement_score":0.5372914,"about_ca_system_score_codex":0.000061382285,"about_ca_system_score_gemma":0.000018482238,"threshold_uncertainty_score":0.34413663},"labels":[],"label_agreement":null},{"id":"W4386590664","doi":"10.1109/tpwrs.2023.3314372","title":"Incorporating System Frequency Dynamics Into Real-Time Locational Marginal Pricing of Electricity","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Electric power system; Electricity market; Automatic frequency control; Electricity; System dynamics; Economic dispatch; Offset (computer science); Marginal cost; Lagrange multiplier; Electric power transmission; Electricity pricing; Upgrade; Wind power; Mathematical optimization; Control theory (sociology); Power (physics); Control (management); Economics; Engineering; Telecommunications; Microeconomics; Mathematics","score_opus":0.005361028158020068,"score_gpt":0.19783565564652614,"score_spread":0.19247462748850608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386590664","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031751566,0.000074039075,0.95723623,0.00001594128,0.0019981314,0.0006518529,0.000057519486,0.0016838934,0.0065308535],"genre_scores_gemma":[0.9982962,0.000024589566,0.0009915945,0.0000021540877,0.00002703476,0.00014440597,0.00003909355,0.00009840957,0.0003765068],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99759,0.00014726057,0.0009280902,0.00034199347,0.0005798035,0.00041284584],"domain_scores_gemma":[0.99875045,0.0002014374,0.0002354235,0.00044497394,0.00025459626,0.00011312394],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00063214585,0.00031350556,0.00047841883,0.0008497534,0.00019170232,0.000059102415,0.00026445245,0.00021851661,0.000012743524],"category_scores_gemma":[0.000009892616,0.00034596454,0.00011969832,0.0024865016,0.000033444365,0.00027361384,0.0000015880314,0.00028172214,0.0002235789],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001524801,0.000044406726,0.00011890292,0.0009028668,0.00016535331,0.000013358699,0.0004100427,0.977503,0.018065728,0.002277881,0.00026904012,0.00021417001],"study_design_scores_gemma":[0.00029582946,0.00012382978,0.000112013004,0.00043483224,0.000043257587,0.000056400215,0.00028145238,0.99362046,0.0046753474,0.000022209399,0.000010893786,0.00032349417],"about_ca_topic_score_codex":0.0005091448,"about_ca_topic_score_gemma":0.00003670393,"teacher_disagreement_score":0.9665446,"about_ca_system_score_codex":0.0012630757,"about_ca_system_score_gemma":0.00012941154,"threshold_uncertainty_score":0.9998992},"labels":[],"label_agreement":null},{"id":"W4386802716","doi":"10.23977/jnca.2023.080101","title":"Research on Large-scale Multi-target Units Combination Model Based on IAFSA","year":2023,"lang":"en","type":"article","venue":"Journal of Network Computing and Applications","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Swarm behaviour; Weighting; Convergence (economics); Mathematical optimization; Computer science; Scale (ratio); Energy (signal processing); Algorithm; Rate of convergence; Mathematics; Key (lock); Statistics","score_opus":0.03902825999438042,"score_gpt":0.3138163660665046,"score_spread":0.27478810607212417,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386802716","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021292776,0.00014223171,0.9768522,0.00019362428,0.0001222964,0.00022808222,0.0000037578066,0.0001486272,0.0010164257],"genre_scores_gemma":[0.99111015,0.000051142615,0.008403189,0.00004384576,0.0002621593,0.000012121674,0.000017757557,0.000025248168,0.00007438088],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99895096,0.000085372565,0.00030030214,0.00011058039,0.0002845851,0.00026822492],"domain_scores_gemma":[0.99902225,0.0003709262,0.00009416479,0.0001461602,0.00028401075,0.00008248892],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013193951,0.000088152156,0.00014126494,0.00031147778,0.00028336528,0.000044930894,0.00013310033,0.00006608345,0.0000011462671],"category_scores_gemma":[0.000024170062,0.00008678845,0.000027706343,0.0016248596,0.000013775782,0.000040736646,0.000018500565,0.00037886974,0.000011355448],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004836668,0.00004808538,0.00018237006,0.000017713639,0.000009097477,8.418353e-7,0.00008339386,0.98964757,0.000022803166,0.0006896768,0.007345421,0.0019481767],"study_design_scores_gemma":[0.0004447466,0.00007269428,0.0007682439,0.000120683195,0.000005532954,0.0000030401868,0.000047218913,0.9962141,0.000029413846,0.00040593432,0.0018138388,0.00007456923],"about_ca_topic_score_codex":4.3437697e-7,"about_ca_topic_score_gemma":8.133474e-7,"teacher_disagreement_score":0.9698174,"about_ca_system_score_codex":0.00007431928,"about_ca_system_score_gemma":0.000038118986,"threshold_uncertainty_score":0.35391304},"labels":[],"label_agreement":null},{"id":"W4386870766","doi":"10.3982/ecta20769","title":"The Investment Effects of Market Integration: Evidence From Renewable Energy Expansion in Chile","year":2023,"lang":"en","type":"article","venue":"Econometrica","topic":"Electric Power System Optimization","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Bureau of Economic Research; University of British Columbia; Rice University; Research Institute of Economy, Trade and Industry; University of California Berkeley; Horizon 2020 Framework Programme; Massachusetts Institute of Technology; European Commission; London School of Economics and Political Science; European Research Council; National Science Foundation","keywords":"Renewable energy; Allocative efficiency; Market integration; Economics; Investment (military); Electricity market; Market power; Electricity; Natural resource economics; Industrial organization; Microeconomics; Monopoly","score_opus":0.008476462423575783,"score_gpt":0.19073798133902037,"score_spread":0.1822615189154446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386870766","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.629065,0.08823673,0.14560007,0.00087865925,0.007926882,0.002327076,0.000039763167,0.0018673656,0.12405847],"genre_scores_gemma":[0.9961116,0.0027343656,0.0002849566,0.00001721385,0.00003731628,0.000092833056,0.0000121661315,0.000016333262,0.00069322577],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99929106,0.00005550528,0.0002743737,0.00013354822,0.00008836234,0.0001571441],"domain_scores_gemma":[0.9984855,0.0011648581,0.000053403593,0.0002467853,0.000016062344,0.000033355867],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024739958,0.00008486828,0.00014586984,0.0004957568,0.000031766278,0.00002601217,0.00015838406,0.000047087156,0.000036522004],"category_scores_gemma":[0.0004057504,0.00007063613,0.00002913616,0.0023774763,0.000010371249,0.0001525262,0.000028634036,0.00004863764,0.00001966416],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004527545,0.0000765953,0.009960448,0.0002523481,0.00017678589,0.000019192135,0.0015476402,0.6793198,0.0065112524,0.000572195,0.23698504,0.064533405],"study_design_scores_gemma":[0.00043762274,0.00011310611,0.04714017,0.00041629473,0.0000127219455,8.6267073e-7,0.00006630352,0.8850398,0.057734292,0.00092262594,0.007865091,0.0002511073],"about_ca_topic_score_codex":0.00060685776,"about_ca_topic_score_gemma":0.00022720975,"teacher_disagreement_score":0.3670466,"about_ca_system_score_codex":0.00015165973,"about_ca_system_score_gemma":0.000018699133,"threshold_uncertainty_score":0.28804576},"labels":[],"label_agreement":null},{"id":"W4387005646","doi":"10.1109/pesgm52003.2023.10252854","title":"MISO’s Regional Long Range Transmission Planning: A Proactive and Holistic Planning Approach","year":2023,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator","funders":"","keywords":"Futures contract; Renewable energy; Scenario planning; Electric power system; Time horizon; Grid; Portfolio; Environmental economics; Wind power; Energy planning; Electricity market; Scenario analysis; Retirement planning; Business; Computer science; Electricity; Engineering; Economics; Power (physics); Marketing; Finance","score_opus":0.05000044085961597,"score_gpt":0.26390172862275185,"score_spread":0.21390128776313588,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387005646","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08407617,0.0017105774,0.88627416,0.000073124436,0.00013707954,0.0005772425,0.0000030079175,0.00177349,0.025375139],"genre_scores_gemma":[0.9951168,0.00003960644,0.0035674195,0.000017851571,0.00006504992,0.00006253203,0.000056869372,0.0000489108,0.0010249894],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991467,0.000026449186,0.00016550704,0.00021524078,0.00017942084,0.00026670503],"domain_scores_gemma":[0.99967027,0.00009335681,0.000020718724,0.00010179032,0.000020418522,0.00009347332],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015003307,0.00015202662,0.00016043057,0.00020856185,0.00007349295,0.000040254326,0.00007417011,0.00009790046,0.000008405797],"category_scores_gemma":[0.00001675968,0.00014052143,0.000026500828,0.00045848405,0.000015987904,0.00014514479,0.000010581255,0.00014044729,0.000010961146],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016417427,0.00008211829,0.019526644,0.0013087001,0.0003705437,0.00018272195,0.01792329,0.9085549,0.0016910346,0.0011161357,0.03873103,0.010348703],"study_design_scores_gemma":[0.0005591225,0.00003232023,0.019827822,0.00010957976,0.000024891484,0.00007274835,0.00031253096,0.9775801,0.00020170967,0.00004709839,0.0009667739,0.00026530484],"about_ca_topic_score_codex":0.0000065545096,"about_ca_topic_score_gemma":1.8479601e-7,"teacher_disagreement_score":0.9110406,"about_ca_system_score_codex":0.000047870963,"about_ca_system_score_gemma":0.000014233248,"threshold_uncertainty_score":0.57302976},"labels":[],"label_agreement":null},{"id":"W4387060054","doi":"10.1007/s12667-023-00623-x","title":"Quantifying the impact of scenario tree generation and reduction methods on the solution of the short-term hydroscheduling problem","year":2023,"lang":"en","type":"article","venue":"Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Rio Tinto (Canada); Group for Research in Decision Analysis; Université du Québec à Chicoutimi","funders":"Mitacs","keywords":"Tree (set theory); Term (time); Variance reduction; Reduction (mathematics); Mathematical optimization; Stochastic programming; Hydropower; Stochastic optimization; Time horizon; Standard deviation; Computer science; Mathematics; Statistics; Engineering; Monte Carlo method","score_opus":0.05356126740358546,"score_gpt":0.30119194340186267,"score_spread":0.2476306759982772,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387060054","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85308135,0.0012946657,0.14208636,0.00011578587,0.0016626852,0.00063165545,0.00000543557,0.00019822361,0.00092383276],"genre_scores_gemma":[0.9992769,0.00009539575,0.00026544728,0.0000011837329,0.00017414162,0.0000606627,0.000010131871,0.000028770122,0.000087388864],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986453,0.00044193788,0.00039684272,0.00014216088,0.00020342747,0.00017031086],"domain_scores_gemma":[0.99930286,0.00013383498,0.00014625098,0.00034195412,0.00005566061,0.000019446325],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012148344,0.0001351881,0.0001860867,0.00010225358,0.00016309887,0.000044125823,0.00015378915,0.00008664461,0.0000010116639],"category_scores_gemma":[0.00004759107,0.00006914549,0.00008762892,0.00065814453,0.000034961547,0.00009170126,0.000025922462,0.00010715696,5.734184e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000029510154,0.000004780747,0.00024703538,0.000043844873,0.00006307006,8.094562e-8,0.0005017092,0.75627404,0.24012011,0.0010944542,0.00024780066,0.0014001128],"study_design_scores_gemma":[0.00006514914,0.000036903824,0.00094198436,0.0001400145,0.000021007305,0.000013852342,0.00010260527,0.95053995,0.048024457,0.000014888992,0.00002633972,0.00007287646],"about_ca_topic_score_codex":0.00046417472,"about_ca_topic_score_gemma":0.000039196908,"teacher_disagreement_score":0.19426587,"about_ca_system_score_codex":0.00012020121,"about_ca_system_score_gemma":0.00002909844,"threshold_uncertainty_score":0.28196713},"labels":[],"label_agreement":null},{"id":"W4387067355","doi":"10.2139/ssrn.4584199","title":"Multi-Objective Electricity Generation Expansion Planning Towards Renewable Energy Policy Objectives Under Uncertainties","year":2023,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Queen's University; Queen's University Belfast","keywords":"Renewable energy; Electricity; Electricity generation; Electricity system; Environmental economics; Natural resource economics; Business; Economics; Environmental science; Engineering; Power (physics); Physics; Electrical engineering","score_opus":0.024183034875682748,"score_gpt":0.26679649665238625,"score_spread":0.2426134617767035,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387067355","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012026345,0.013422556,0.9698186,0.00016419885,0.0021346638,0.00040233493,0.000016358636,0.0010754709,0.0009394707],"genre_scores_gemma":[0.9717047,0.018296055,0.0012973002,0.000052077157,0.0024371243,0.00013366624,0.00019212841,0.0003266084,0.0055603036],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.993783,0.00038265562,0.00091167446,0.00075048883,0.0007153305,0.0034568524],"domain_scores_gemma":[0.99837595,0.00008934091,0.00044940066,0.0005084958,0.00040375814,0.00017307753],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0015880698,0.00080476765,0.00078240054,0.0016376837,0.0004612815,0.00034654723,0.0006231203,0.00078973593,0.0000067586407],"category_scores_gemma":[0.0002341713,0.0008448602,0.00033168614,0.001253759,0.000044685443,0.0003949315,0.00021351594,0.004006437,0.000012652059],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":true,"study_design_scores_codex":[0.000030166333,0.000042765972,0.00006642989,0.00005377187,0.0008018439,0.000007782265,0.00074568664,0.98893386,0.0037075267,0.0021176485,0.0007605415,0.002731961],"study_design_scores_gemma":[0.0010682625,0.00035032115,0.00039286588,0.0003374941,0.00018260846,0.00030948195,0.0017080476,0.8841982,0.009647474,0.10024508,0.00016106821,0.0013990965],"about_ca_topic_score_codex":0.0067278943,"about_ca_topic_score_gemma":0.0056646722,"teacher_disagreement_score":0.9685213,"about_ca_system_score_codex":0.011588067,"about_ca_system_score_gemma":0.007451409,"threshold_uncertainty_score":0.9998864},"labels":[],"label_agreement":null},{"id":"W4387071727","doi":"10.1016/j.jup.2023.101671","title":"Screening for collusion in wholesale electricity markets: A literature review","year":2023,"lang":"en","type":"review","venue":"Utilities Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Collusion; Transparency (behavior); Electricity; Industrial organization; Tacit collusion; Microeconomics; Business; Economics; Computer science; Computer security; Engineering","score_opus":0.038610317675735306,"score_gpt":0.329589560123791,"score_spread":0.2909792424480557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387071727","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[1.4879114e-7,0.9916163,0.0020698386,0.000035140718,0.00022758692,0.0031115315,0.00042805128,0.0006136253,0.0018977624],"genre_scores_gemma":[0.0000011081327,0.99290025,0.0004596794,0.00008381479,0.0005043597,0.0012458984,0.0006781997,0.00022443225,0.0039022581],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99734986,0.00021204949,0.00106713,0.00041186358,0.00023234826,0.00072675786],"domain_scores_gemma":[0.99864763,0.0005035191,0.00018448911,0.0004958938,0.00007449478,0.00009396987],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007360843,0.0005763882,0.001925377,0.0013128031,0.00006873056,0.000090775764,0.00040881435,0.00049449736,0.000011865438],"category_scores_gemma":[0.0007065393,0.00055558915,0.00045912576,0.004222682,0.000017942444,0.00015562595,0.000073119925,0.0005275665,0.000027747605],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000035951623,0.000008404184,3.4093853e-7,0.4093844,0.00008675485,0.000010934012,0.00010147403,0.000047660345,6.419808e-8,0.00033604604,0.029268006,0.56075233],"study_design_scores_gemma":[0.00012389048,0.000016588374,7.4068834e-7,0.2290225,0.000117846634,0.00002809175,0.0000039211313,0.0026001402,2.7560014e-7,0.00004724541,0.76769006,0.00034868222],"about_ca_topic_score_codex":0.00003745717,"about_ca_topic_score_gemma":0.000026866213,"teacher_disagreement_score":0.7384221,"about_ca_system_score_codex":0.00072294095,"about_ca_system_score_gemma":0.00030235655,"threshold_uncertainty_score":0.9996896},"labels":[],"label_agreement":null},{"id":"W4387099746","doi":"10.1080/15435075.2023.2262005","title":"Long-term optimal coordination of hydro-wind-thermal energy generation using stochastic dynamic programming","year":2023,"lang":"en","type":"article","venue":"International Journal of Green Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Renewable energy; Wind power; Mathematical optimization; Dynamic programming; Stochastic programming; Computer science; Term (time); Environmental science; Engineering; Mathematics; Electrical engineering","score_opus":0.012037663981925309,"score_gpt":0.2465405341958177,"score_spread":0.23450287021389238,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387099746","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43365666,0.00022623353,0.5646145,0.000055623572,0.0013142973,0.000032548825,0.000004748378,0.00005872071,0.000036684138],"genre_scores_gemma":[0.99731755,0.000045093126,0.0017682373,0.000013756059,0.00052771496,0.0000036373838,0.000080446785,0.000049750946,0.00019378384],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982051,0.000057439727,0.00073496654,0.00012932593,0.00065925997,0.0002139078],"domain_scores_gemma":[0.9987716,0.000052328818,0.00043042863,0.000108693246,0.00056748994,0.00006943808],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025858358,0.0001707092,0.00024645764,0.0008562113,0.000038685313,0.000053742202,0.00034979958,0.00010464357,0.000020732812],"category_scores_gemma":[0.000034888835,0.00017989655,0.00013275986,0.00046919307,0.00002710735,0.00044727518,0.00004090301,0.000107661355,0.0000017987585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023945839,0.00002954747,0.00030598175,0.000012343489,0.00028790912,0.00005129963,0.00010455423,0.9105381,0.054904927,0.00025464813,0.000053245454,0.033433534],"study_design_scores_gemma":[0.00056714064,0.00008568993,0.0008893417,0.00011363123,0.000049448423,0.00021020856,0.000011956433,0.9911034,0.0066965246,0.000023403907,0.0000884198,0.00016084507],"about_ca_topic_score_codex":0.00013140215,"about_ca_topic_score_gemma":0.000077992714,"teacher_disagreement_score":0.5636609,"about_ca_system_score_codex":0.00035430118,"about_ca_system_score_gemma":0.00007401478,"threshold_uncertainty_score":0.73359686},"labels":[],"label_agreement":null},{"id":"W4387490385","doi":"10.1109/access.2023.3323594","title":"Machine Learning-Additional Decision Constraints for Improved MILP Day-Ahead Unit Commitment Method","year":2023,"lang":"en","type":"article","venue":"IEEE Access","topic":"Electric Power System Optimization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Power system simulation; Unit (ring theory); Artificial intelligence; Mathematical optimization; Machine learning; Operations research; Mathematics; Electric power system","score_opus":0.0335011058700486,"score_gpt":0.32260246790492514,"score_spread":0.2891013620348765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387490385","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019561748,0.00009076507,0.99320424,0.0000833005,0.0011450524,0.0006496029,0.0008019506,0.0007831136,0.0012857828],"genre_scores_gemma":[0.93580145,0.00020384774,0.05475579,0.00021916357,0.0005672273,0.0011042174,0.00537363,0.00024525527,0.0017294143],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99888307,0.00007275107,0.00031097085,0.00022980713,0.00017929247,0.00032413588],"domain_scores_gemma":[0.99848026,0.0010648087,0.00006550546,0.0001976309,0.00010766275,0.00008412656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005145262,0.00017767545,0.00022111072,0.00024314126,0.00013327708,0.000102416896,0.00031559757,0.00010670769,0.000532049],"category_scores_gemma":[0.00019662008,0.00018204798,0.000071122275,0.000615753,0.000021113774,0.00023950764,0.00003588559,0.00017558254,0.00008151392],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057204987,0.00004820374,0.0004082584,0.0001775961,0.00023990152,0.000012138299,0.0002106911,0.68681645,0.004123628,0.00040079895,0.14480197,0.16270317],"study_design_scores_gemma":[0.0008404129,0.000053803426,0.00041805636,0.000054831424,0.000022700613,0.000008897194,0.000011465903,0.9581928,0.0033649404,0.00070822204,0.036099274,0.00022456922],"about_ca_topic_score_codex":0.000015240793,"about_ca_topic_score_gemma":0.00002596967,"teacher_disagreement_score":0.9384485,"about_ca_system_score_codex":0.000093786424,"about_ca_system_score_gemma":0.000032179323,"threshold_uncertainty_score":0.7423701},"labels":[],"label_agreement":null},{"id":"W4387938908","doi":"10.1111/joie.12352","title":"Market Structure, Risk Preferences, and Forward Contracting Incentives*","year":2023,"lang":"en","type":"article","venue":"Journal of Industrial Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund; Government of Canada","keywords":"Forward contract; Incentive; Risk aversion (psychology); Microeconomics; Variance (accounting); Profit (economics); Economics; Electricity; Electricity market; Forward market; Business; Expected utility hypothesis; Financial economics","score_opus":0.016271609517281446,"score_gpt":0.20233095839106777,"score_spread":0.18605934887378633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387938908","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9958398,0.00014278323,0.00081840146,0.000029779694,0.0016224795,0.00010720263,0.000033566357,0.000039984516,0.0013660127],"genre_scores_gemma":[0.997738,0.0012761357,0.0003525362,0.0000049851947,0.000580217,7.075204e-7,0.0000028745842,0.000019068115,0.000025487168],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991623,0.000046277717,0.000500751,0.000073007854,0.00005534046,0.00016228943],"domain_scores_gemma":[0.999233,0.00019242227,0.00038265664,0.00006685497,0.000044752476,0.000080333455],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005643472,0.00009995802,0.0002480108,0.00019394072,0.000042183176,0.000076305114,0.00010390046,0.00015139715,0.000032413725],"category_scores_gemma":[0.0002742272,0.000096931566,0.000041899486,0.00015101628,0.0000125966835,0.00033306316,0.000017626036,0.000391443,0.0000022829358],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034878048,0.000019608144,0.08371689,0.00005320164,0.0010131926,0.000023637056,0.0006456515,0.51895916,0.00027916903,0.00024157773,0.035924695,0.35877445],"study_design_scores_gemma":[0.01232274,0.00066145015,0.023134032,0.00045033684,0.00041626312,0.00045811976,0.0012212001,0.9097647,0.0045498786,0.00706037,0.0387283,0.0012326088],"about_ca_topic_score_codex":0.00000835573,"about_ca_topic_score_gemma":0.000011961823,"teacher_disagreement_score":0.39080554,"about_ca_system_score_codex":0.00012894635,"about_ca_system_score_gemma":0.000066600194,"threshold_uncertainty_score":0.39527547},"labels":[],"label_agreement":null},{"id":"W4387986941","doi":"10.1109/tempr.2023.3327903","title":"Tight and Compact Data-Driven Linear Relaxations for Constraint Screening in Unit Commitment","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Energy Markets Policy and Regulation","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Computer science; Constraint (computer-aided design); Set (abstract data type); Mathematical optimization; Mathematics; Programming language","score_opus":0.033512069781384615,"score_gpt":0.27139728734247487,"score_spread":0.23788521756109027,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387986941","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013314617,0.000045918274,0.9844355,0.0005353956,0.00015810458,0.00027710682,0.00015026084,0.00026685678,0.00081626105],"genre_scores_gemma":[0.9970348,0.00033380758,0.0016916692,0.000026270345,0.000059317244,0.00003539292,0.00021392401,0.000028554297,0.000576275],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992037,0.0000634367,0.00024622004,0.00019537372,0.00009751665,0.00019374138],"domain_scores_gemma":[0.9993836,0.0002653016,0.0000409509,0.00021801957,0.0000264396,0.00006565547],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019494344,0.00013298907,0.00014625884,0.00055120676,0.00015969832,0.000028550536,0.00006753601,0.00010237497,0.000007028758],"category_scores_gemma":[0.0000118750495,0.00013871325,0.000022139464,0.0005645525,0.00004305973,0.0002070199,0.000001643556,0.00008454615,0.0000010162885],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003295697,0.000019216797,0.000048095517,0.00003968645,0.000054913642,7.126535e-7,0.00012292202,0.974111,0.00027461062,0.0016706764,0.00036008802,0.023265112],"study_design_scores_gemma":[0.00066691014,0.0000305928,0.004654475,0.00007207918,0.000022525783,0.000008708508,0.000026319054,0.98977554,0.00068219856,0.00014166282,0.00377887,0.00014014062],"about_ca_topic_score_codex":0.00014290214,"about_ca_topic_score_gemma":0.00028404614,"teacher_disagreement_score":0.9837202,"about_ca_system_score_codex":0.000045050798,"about_ca_system_score_gemma":0.00002909903,"threshold_uncertainty_score":0.5656562},"labels":[],"label_agreement":null},{"id":"W4388172182","doi":"10.58702/teyd.1357334","title":"CONVERGENCE OF WHOLESALE ELECTRICITY PRICES ACROSS EUROPEAN MARKETS: ARE WE THERE YET?","year":2023,"lang":"en","type":"article","venue":"Toplum Ekonomi ve Yönetim Dergisi","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lethbridge College","funders":"","keywords":"Unit root; Electricity; Convergence (economics); Economics; Electricity market; Spot contract; Econometrics; Market integration; Law of one price; International economics; Price level; Financial economics; Microeconomics; Macroeconomics; Mid price","score_opus":0.012218480927987692,"score_gpt":0.22408060010734057,"score_spread":0.21186211917935288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388172182","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9639797,0.0031866892,0.010595523,0.00020557272,0.00101466,0.0005183333,0.000062124134,0.0013561363,0.019081255],"genre_scores_gemma":[0.9966292,0.0017229271,0.00021880618,0.000023421795,0.0001034485,0.000026785574,0.000033122258,0.00010466835,0.0011376158],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981428,0.00013205387,0.0005327904,0.0003562758,0.00023118425,0.00060491206],"domain_scores_gemma":[0.9989049,0.00017558949,0.00020490792,0.0005099123,0.00009483984,0.00010986097],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005386477,0.000281441,0.00037329178,0.00016334093,0.00009445612,0.00006155738,0.00047763053,0.000116583215,0.0000684715],"category_scores_gemma":[0.00007679227,0.00030454044,0.00010710135,0.0011483202,0.000048968363,0.00022187167,0.00010063842,0.00021411602,0.00035493224],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027227117,0.0002852559,0.107425734,0.003042338,0.0010351927,0.00033934187,0.008406675,0.65515465,0.023067713,0.0006645789,0.16077414,0.03953211],"study_design_scores_gemma":[0.002144769,0.00024453524,0.32176223,0.0006943221,0.000104629886,0.000052219148,0.0016894327,0.5683771,0.03995533,0.0001295034,0.06291247,0.0019334684],"about_ca_topic_score_codex":0.000022905959,"about_ca_topic_score_gemma":0.00003179258,"teacher_disagreement_score":0.2143365,"about_ca_system_score_codex":0.00012580874,"about_ca_system_score_gemma":0.000032856737,"threshold_uncertainty_score":0.9999407},"labels":[],"label_agreement":null},{"id":"W4388281732","doi":"10.1109/cpese59653.2023.10303240","title":"Emission Mitigation Dispatch in Wind Power Generation with Expedited Machine Learning","year":2023,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Wind power; Computer science; Scheme (mathematics); Artificial neural network; Smart grid; Grid; Feed forward; Implementation; Feedforward neural network; Artificial intelligence; Embedded system; Control engineering; Engineering; Electrical engineering; Mathematics","score_opus":0.006088527454845526,"score_gpt":0.19364958334635893,"score_spread":0.1875610558915134,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388281732","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9205242,0.00008452578,0.07349182,0.0000938067,0.00022077397,0.00022593046,0.000001041084,0.00093516445,0.004422754],"genre_scores_gemma":[0.9977877,0.00003048784,0.0006371057,0.000009034937,0.000052997828,0.000015032137,0.00022904783,0.000035437864,0.0012031435],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993016,0.00003502616,0.00017709204,0.00014209721,0.00016675609,0.00017742516],"domain_scores_gemma":[0.9997908,0.000023462237,0.000023770825,0.00009387967,0.000027990121,0.000040108163],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001467188,0.000105549385,0.0000949766,0.00022803483,0.000040816976,0.000031378608,0.00004239216,0.00006871628,0.00006622635],"category_scores_gemma":[0.000028273333,0.00009167554,0.000011846927,0.00089372037,0.0000042502393,0.00020013833,0.000008279023,0.0001244076,0.00003940316],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000066057037,0.000009018342,0.034881126,0.000019065912,0.00001000983,0.000011820763,0.00078045967,0.9292605,0.03219953,0.000047726062,0.0019735666,0.0008005818],"study_design_scores_gemma":[0.00033343185,0.000037718208,0.004871868,0.000033326014,0.0000026796813,0.0000049785467,0.00006249597,0.986494,0.0076260427,0.0000038767043,0.0003949507,0.00013463883],"about_ca_topic_score_codex":0.000030319516,"about_ca_topic_score_gemma":0.000047462534,"teacher_disagreement_score":0.07726353,"about_ca_system_score_codex":0.00008423993,"about_ca_system_score_gemma":0.00000980642,"threshold_uncertainty_score":0.37384197},"labels":[],"label_agreement":null},{"id":"W4388911810","doi":"10.1177/17835917231217125","title":"Strategic interaction between wholesale and ancillary service markets","year":2023,"lang":"en","type":"article","venue":"Competition and Regulation in Network Industries","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund; Canada Research Chairs","keywords":"Industrial organization; Business; Incentive; Market system; Marginal cost; Microeconomics; Economics","score_opus":0.025228560648719766,"score_gpt":0.22224344761843032,"score_spread":0.19701488696971056,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388911810","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9908112,0.00051189633,0.0025384699,0.00047017427,0.0003978952,0.00024980665,0.0000069002003,0.0004906848,0.0045229387],"genre_scores_gemma":[0.9989471,0.0003273714,0.000087093256,0.000021034966,0.00022914751,0.000013585158,0.00019941363,0.00001616734,0.00015912083],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993385,0.000057462486,0.00022124485,0.00013134479,0.00009053472,0.00016092543],"domain_scores_gemma":[0.99970967,0.000090845264,0.00004069425,0.0000747778,0.000040299277,0.00004369888],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021234802,0.000102635764,0.00012778759,0.00016068877,0.00008209393,0.000065131164,0.000030337249,0.00014605331,0.000023201275],"category_scores_gemma":[0.0000053018157,0.00011342709,0.0000074811373,0.00095248484,0.000023853125,0.00021884163,0.000019119785,0.00014680806,0.000009581454],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003447519,0.000011471117,0.1179857,0.00034983674,0.00005584792,0.000007378078,0.000586149,0.8426513,0.00025013817,0.009456761,0.010007404,0.018603511],"study_design_scores_gemma":[0.0005818463,0.000024903504,0.4926017,0.00044672444,0.000014948128,0.00001838381,0.00044503668,0.4927901,0.000112481546,0.0021528883,0.0105236145,0.00028737908],"about_ca_topic_score_codex":0.000005320496,"about_ca_topic_score_gemma":0.000030368015,"teacher_disagreement_score":0.37461597,"about_ca_system_score_codex":0.000040431394,"about_ca_system_score_gemma":0.000014211078,"threshold_uncertainty_score":0.46254224},"labels":[],"label_agreement":null},{"id":"W4389566398","doi":"10.5547/01956574.37.2.kmal","title":"The Impact of Electricity Sector Restructuring on Coal-fired Power Plants in India","year":2016,"lang":"en","type":"article","venue":"The Energy Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kellogg's (Canada)","funders":"","keywords":"Unbundling; Restructuring; Electricity; Electricity generation; Business; Nameplate capacity; Coal; Industrial organization; Electricity retailing; Natural resource economics; Power (physics); Environmental economics; Electricity market; Economics; Waste management; Finance; Engineering; Electrical engineering","score_opus":0.005156594268744106,"score_gpt":0.20191142300090784,"score_spread":0.19675482873216374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389566398","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99383545,0.00042713684,0.0032485165,0.000036255868,0.00033688336,0.000045191442,0.0000033407034,0.0000318663,0.002035368],"genre_scores_gemma":[0.9993928,0.00039197513,0.000012084124,0.0000056885556,0.00009879358,0.0000023527336,3.0894356e-7,0.000022673972,0.000073320836],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9990209,0.00013084308,0.00028477618,0.00006546025,0.00019972355,0.00029830256],"domain_scores_gemma":[0.9993738,0.0002456449,0.000117324234,0.00018892746,0.000024592679,0.000049744227],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038729192,0.00011865074,0.00013706382,0.00013703151,0.0000960196,0.000030645333,0.00027899147,0.000057694957,0.000023258657],"category_scores_gemma":[0.000063484105,0.00005059737,0.000067037414,0.00019756854,0.000019331148,0.00008135479,0.0000123821965,0.00019491959,0.000002358682],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008557842,0.00008120523,0.016798835,0.000012339751,0.0007674138,0.000095569674,0.0015087859,0.7923119,0.14449649,0.0026763347,0.009358572,0.031036748],"study_design_scores_gemma":[0.004300788,0.0010060591,0.6828844,0.0007037407,0.000028432047,0.0014825806,0.0000752472,0.04136058,0.2618107,0.004707574,0.00082171103,0.0008181969],"about_ca_topic_score_codex":0.00003965085,"about_ca_topic_score_gemma":0.000014581706,"teacher_disagreement_score":0.75095135,"about_ca_system_score_codex":0.0003054819,"about_ca_system_score_gemma":0.00005315105,"threshold_uncertainty_score":0.20633008},"labels":[],"label_agreement":null},{"id":"W4390097585","doi":"10.1109/powerafrica57932.2023.10363298","title":"Pareto Optimality in Economic-Environmental Dispatch (EED) of Grid-Generators: A Case for Nigeria","year":2023,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Economic dispatch; Pareto principle; Mathematical optimization; Multi-objective optimization; Computer science; Grid; Electricity; Pareto optimal; Snapshot (computer storage); Electricity generation; Operations research; Engineering; Electric power system; Mathematics; Power (physics)","score_opus":0.00836669747891244,"score_gpt":0.21389207871092783,"score_spread":0.20552538123201539,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390097585","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9840855,0.00006355406,0.01440702,0.000017172963,0.00039543287,0.00037354755,0.00013320163,0.00016868027,0.00035586522],"genre_scores_gemma":[0.9978711,0.00002690336,0.00176652,0.0000049765267,0.000054060216,0.00010076313,0.00007566242,0.00002896412,0.00007102042],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992871,0.00001670497,0.0003060256,0.0001456993,0.000043945503,0.00020052562],"domain_scores_gemma":[0.9997183,0.00004804594,0.000028934455,0.00016040848,0.0000030135704,0.00004127968],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019683977,0.00010312868,0.00017340523,0.00010169191,0.000017362869,0.000011928988,0.00006546709,0.000061392566,0.00006420821],"category_scores_gemma":[0.000007311193,0.00011130787,0.000042376312,0.000114894014,0.000009476188,0.00010580404,0.000019280536,0.000035626155,0.000035627996],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015499882,0.00002954113,0.037047923,0.00014306729,0.00005019503,0.000058285274,0.00045192128,0.9519593,0.0032719255,0.00014278117,0.006197139,0.00063241285],"study_design_scores_gemma":[0.00064393046,0.000046308738,0.0022156714,0.000011651821,0.000007826333,0.00004588092,0.00029325188,0.97470176,0.021461988,0.00003363819,0.00029744586,0.00024061528],"about_ca_topic_score_codex":0.00010444809,"about_ca_topic_score_gemma":0.00040472182,"teacher_disagreement_score":0.034832254,"about_ca_system_score_codex":0.0001906725,"about_ca_system_score_gemma":0.00001150143,"threshold_uncertainty_score":0.45390034},"labels":[],"label_agreement":null},{"id":"W4390296028","doi":"10.1016/j.tej.2023.107352","title":"Congestion unpriced: Inefficiency and gaming in Ontario’s two-schedule electricity market design","year":2023,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Canada Energy Regulator","funders":"","keywords":"Inefficiency; Schedule; Electricity market; Electricity; Payment; Congestion management; Economics; Shadow price; Microeconomics; Business; Industrial organization; Electric power system; Finance; Power (physics); Engineering","score_opus":0.014560178166843896,"score_gpt":0.21082394423008566,"score_spread":0.19626376606324175,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390296028","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78759557,0.0011492274,0.20703708,0.00020175076,0.0003971745,0.0005137194,6.493776e-7,0.00037936974,0.0027254694],"genre_scores_gemma":[0.9982008,0.0004676766,0.00071831973,0.000037653346,0.00009367365,0.000018722138,0.000002043907,0.000040187555,0.00042095056],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99787146,0.00033669273,0.00048492057,0.00020839168,0.00037495515,0.00072358595],"domain_scores_gemma":[0.99904096,0.0004563111,0.00012475382,0.00017926029,0.000087094646,0.00011160266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027365675,0.0002375184,0.00027770406,0.00068805594,0.00027090166,0.00015708689,0.00029397005,0.00010797181,0.000046017354],"category_scores_gemma":[0.00026829148,0.0001986136,0.000048214963,0.002614579,0.00002561441,0.00028324427,0.000031363572,0.0011206489,0.00002096725],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016039297,0.00010115757,0.016466709,0.000049192702,0.0001394915,0.00013622356,0.0024639294,0.92989814,0.01731643,0.00038781855,0.0075339973,0.025346488],"study_design_scores_gemma":[0.0009688032,0.00015605365,0.052525934,0.00005437049,0.000037600334,0.000610666,0.000035191,0.94167995,0.0027522705,0.0006591819,0.00019306717,0.00032692548],"about_ca_topic_score_codex":0.0008799386,"about_ca_topic_score_gemma":0.0025260164,"teacher_disagreement_score":0.21060522,"about_ca_system_score_codex":0.00086460164,"about_ca_system_score_gemma":0.00020148557,"threshold_uncertainty_score":0.80992275},"labels":[],"label_agreement":null},{"id":"W4390451140","doi":"10.1007/s11149-023-09467-w","title":"A simple way to integrate distributed storage into a wholesale electricity market","year":2023,"lang":"en","type":"article","venue":"Journal of Regulatory Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Independent Electricity System Operator","funders":"Advanced Research Projects Agency; Advanced Research Projects Agency - Energy; U.S. Department of Energy; Directorate for Engineering; National Science Foundation","keywords":"Flexibility (engineering); Bidding; Energy storage; Grid; Renewable energy; Electricity market; Electricity; Electric power system; Environmental economics; Computer science; Distributed generation; Smart grid; Wind power; Economics; Microeconomics; Power (physics); Electrical engineering; Engineering","score_opus":0.005401351651823747,"score_gpt":0.19488861739299196,"score_spread":0.1894872657411682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390451140","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9510909,0.00017964563,0.047291473,0.00010504294,0.000646481,0.00014454384,0.00002338003,0.000159421,0.0003591624],"genre_scores_gemma":[0.9986782,0.0001290626,0.0006935412,0.000035560824,0.00018982559,0.0000052060345,0.000012989415,0.000053158245,0.00020242606],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988177,0.00004364283,0.0006134687,0.0001293927,0.000099115045,0.00029669766],"domain_scores_gemma":[0.9991847,0.00006683715,0.0002074246,0.00023232825,0.00010958942,0.0001990936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00072740245,0.00016921513,0.00036083633,0.0004676513,0.000051105784,0.000067097535,0.00026833394,0.0001028174,0.00003235548],"category_scores_gemma":[0.00008332315,0.00017620042,0.00012082927,0.0006331948,0.000012562609,0.00028353027,0.00003138436,0.00022130417,0.000049828745],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007327092,0.000021953228,0.0014451509,0.00007820871,0.0001973964,0.000033574473,0.00036203326,0.854411,0.0026007683,0.00017326555,0.13506104,0.005542334],"study_design_scores_gemma":[0.00097653456,0.00026971786,0.025571961,0.00008303531,0.000057819536,0.00013735871,0.00018227726,0.8896158,0.0072082276,0.0012145991,0.07409728,0.0005854018],"about_ca_topic_score_codex":0.0000039814922,"about_ca_topic_score_gemma":0.000016421403,"teacher_disagreement_score":0.060963754,"about_ca_system_score_codex":0.0008086043,"about_ca_system_score_gemma":0.000074940086,"threshold_uncertainty_score":0.7185245},"labels":[],"label_agreement":null},{"id":"W4391342658","doi":"10.1109/isgteurope56780.2023.10407236","title":"Learning to Predict Security Constraints for Large-Scale Unit Commitment Problems","year":2023,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Scale (ratio); Computer science; Power system simulation; Unit (ring theory); Psychology; Mathematics education; Power (physics)","score_opus":0.011918028466635096,"score_gpt":0.22998721693292037,"score_spread":0.21806918846628529,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391342658","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06721713,0.0000530748,0.8879679,0.00026495307,0.0006592921,0.0024934276,0.00007024827,0.004340456,0.036933556],"genre_scores_gemma":[0.99554557,0.000013459725,0.0020947065,0.00003151177,0.000044238306,0.00025660227,0.00010011239,0.00003892853,0.0018748925],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999183,0.000022925677,0.00018754165,0.00014208737,0.00012165199,0.00034278719],"domain_scores_gemma":[0.9996494,0.00007065506,0.000016210723,0.00012234082,0.000049891438,0.00009147101],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003490747,0.00010620096,0.00013000397,0.0001219442,0.00007547543,0.000030163621,0.00009233581,0.00006039211,0.00007867126],"category_scores_gemma":[0.0000405177,0.00010929551,0.000033111017,0.00047566823,0.0000061268415,0.00005985886,0.000026772865,0.00009587133,0.00014838389],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000060165194,0.00003349284,0.0046191434,0.00032264017,0.000083616214,0.0000022240072,0.0045251534,0.94784796,0.0006121938,0.0009865948,0.038323715,0.0026372478],"study_design_scores_gemma":[0.0004989978,0.00011858231,0.00032468146,0.000045331755,0.00000991186,0.00000263172,0.0005282119,0.9511145,0.00094274763,0.00009180827,0.046155427,0.00016717243],"about_ca_topic_score_codex":0.0000041560834,"about_ca_topic_score_gemma":0.000040921037,"teacher_disagreement_score":0.9283284,"about_ca_system_score_codex":0.00005843004,"about_ca_system_score_gemma":0.000013200475,"threshold_uncertainty_score":0.44569418},"labels":[],"label_agreement":null},{"id":"W4391696955","doi":"10.1109/tpwrs.2024.3364502","title":"Flexibility Characterization of Sustainable Power Systems in Demand Space: A Data-Driven Inverse Optimization Approach","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Natural Sciences and Engineering Research Council of Canada; Institut de Valorisation des Données","keywords":"Electric power system; Mathematical optimization; Computer science; Flexibility (engineering); Renewable energy; Robust optimization; Mathematics; Power (physics); Engineering","score_opus":0.015098532778809662,"score_gpt":0.22586097018666046,"score_spread":0.2107624374078508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391696955","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011033248,0.0007406894,0.98042744,0.000015853293,0.0033118976,0.0018771926,0.00023102858,0.00067592476,0.0016867433],"genre_scores_gemma":[0.99771583,0.00013945765,0.0007196052,0.0000040949863,0.000017998533,0.00025033441,0.00019694753,0.00011569787,0.0008400562],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970955,0.00027368544,0.0009884902,0.0006729531,0.0004734592,0.00049591635],"domain_scores_gemma":[0.99842566,0.000091795155,0.0001281134,0.0010475798,0.00018788729,0.00011895765],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008935975,0.00037820972,0.00057186105,0.00094640575,0.00008424459,0.00025793776,0.00038400487,0.0003259435,0.000032606225],"category_scores_gemma":[0.000013678486,0.0003943847,0.00008808793,0.0017799139,0.000044337485,0.001257545,0.000005741719,0.00036815813,0.000021274687],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003030789,0.00013523106,0.000019179712,0.0016682134,0.00013653198,0.000019349605,0.0011452418,0.99415535,0.0020102672,0.00042969472,0.00023487779,0.000015768428],"study_design_scores_gemma":[0.00039344432,0.00008447267,0.000023734447,0.00043720458,0.00006048225,0.000040786388,0.0007733644,0.9964648,0.0005706478,0.0000011802812,0.0008093484,0.0003405451],"about_ca_topic_score_codex":0.00024163254,"about_ca_topic_score_gemma":0.000010519011,"teacher_disagreement_score":0.98668253,"about_ca_system_score_codex":0.0006394054,"about_ca_system_score_gemma":0.00014024603,"threshold_uncertainty_score":0.9998508},"labels":[],"label_agreement":null},{"id":"W4392119575","doi":"10.1016/j.epsr.2024.110224","title":"Data-driven distributionally robust optimization approach for the coordinated dispatching of the power system considering the correlation of wind power","year":2024,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Science and Technology Project of State Grid","keywords":"Wind power; Power (physics); Electric power system; Correlation; Computer science; Mathematical optimization; Control theory (sociology); Engineering; Mathematics; Electrical engineering; Artificial intelligence; Physics","score_opus":0.03846914403992209,"score_gpt":0.2777123235749775,"score_spread":0.23924317953505542,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392119575","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002447195,0.010858703,0.9785658,0.00016234512,0.0017043159,0.0034402225,0.00035900052,0.00023242077,0.0022300056],"genre_scores_gemma":[0.99855745,0.00005792123,0.000558274,0.000002775512,0.0000722679,0.00020265969,0.00019517611,0.00009694325,0.00025656045],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9956518,0.00075434224,0.0010308543,0.0005249839,0.0013330677,0.000704995],"domain_scores_gemma":[0.9950371,0.0024045107,0.00023350249,0.0014129807,0.00084017706,0.00007175986],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0047695003,0.00030301994,0.00044309293,0.00036256196,0.000536763,0.00030376326,0.0015139056,0.00023521262,0.00001424772],"category_scores_gemma":[0.0007114301,0.00017689147,0.00015533523,0.0031932197,0.00014849844,0.00039719173,0.00025296092,0.00081454916,0.0000045048946],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026138394,0.000030278201,0.00015816203,0.00065162446,0.00036042905,0.0000015784544,0.00043909097,0.98520845,0.0007662764,0.006410289,0.0058983862,0.000049324473],"study_design_scores_gemma":[0.00027122744,0.00007827862,0.00019096916,0.00046674424,0.000074948795,0.00007101957,0.00064924994,0.9966501,0.00026708873,0.0000058007813,0.0010935335,0.00018105305],"about_ca_topic_score_codex":0.00011833281,"about_ca_topic_score_gemma":0.000004743167,"teacher_disagreement_score":0.9961102,"about_ca_system_score_codex":0.000657223,"about_ca_system_score_gemma":0.00040497046,"threshold_uncertainty_score":0.72134244},"labels":[],"label_agreement":null},{"id":"W4392652131","doi":"10.5194/egusphere-egu24-20054","title":"Machine learning power system emulation for rapid screening of multi-sector policies","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Emulation; Power (physics); Computer science; Business; Artificial intelligence; Economics; Economic growth","score_opus":0.02221111176636811,"score_gpt":0.24546179324499065,"score_spread":0.22325068147862254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392652131","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004313501,0.0064430367,0.978987,0.000019011113,0.0015404758,0.0011739803,0.000094149225,0.0019075121,0.005521375],"genre_scores_gemma":[0.96817756,0.00004379028,0.030295458,0.000003292035,0.00012542993,0.0001207786,0.00020090218,0.00016375526,0.000869062],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984222,0.00005533907,0.0006776965,0.00033178192,0.00022245516,0.0002904938],"domain_scores_gemma":[0.99919593,0.00012124329,0.00016813345,0.0003042948,0.00015554504,0.00005486061],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037181584,0.00034699074,0.00053041,0.00050906657,0.000047256584,0.000084638996,0.00019118094,0.00034957405,0.000034362416],"category_scores_gemma":[0.00006959399,0.00034448205,0.00021943478,0.00025805007,0.000010839661,0.0000537224,0.00018065046,0.0004901832,0.000011161299],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009460871,0.0000073067354,0.00020801097,0.004477878,0.00025475572,8.53726e-7,0.0006044443,0.99095494,0.0013073271,0.0010227312,0.0001963842,0.00095593097],"study_design_scores_gemma":[0.0002830115,0.00003895407,0.00010915028,0.00088541216,0.000083535895,0.0000051684597,0.00010544488,0.9953791,0.0022901674,0.000016515056,0.0004959675,0.00030759713],"about_ca_topic_score_codex":0.00020779808,"about_ca_topic_score_gemma":0.000020431396,"teacher_disagreement_score":0.963864,"about_ca_system_score_codex":0.000231359,"about_ca_system_score_gemma":0.000035317145,"threshold_uncertainty_score":0.9999007},"labels":[],"label_agreement":null},{"id":"W4393064797","doi":"10.1002/9781119419525.ch6","title":"Assessment of VWF clearance","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Chemistry","score_opus":0.0037411273989288816,"score_gpt":0.22999984305977114,"score_spread":0.22625871566084227,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393064797","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[2.4088519e-7,0.0022378985,0.08771842,0.0000030929261,0.00060083205,0.00009906929,0.0000053595727,0.00068219856,0.9086529],"genre_scores_gemma":[0.01200295,0.00022977628,0.006001056,0.000004326855,0.00008193029,0.0000097482325,0.0000054267216,0.0005155186,0.98114926],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996347,0.0000047518665,0.000110932466,0.00008494126,0.00009278782,0.00007193134],"domain_scores_gemma":[0.99980634,0.0000033615433,0.00002016533,0.00015163857,0.0000055728447,0.000012916181],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00003101521,0.00008802699,0.00014837466,0.00013404367,0.0000011858126,0.000006905388,0.0000635842,0.00010670207,0.0011625178],"category_scores_gemma":[0.000001107697,0.000084668485,0.000028295306,0.0001353955,0.0000039820206,0.000008227626,0.000006942432,0.00007755636,0.00023925379],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.73723e-8,0.000002632937,0.0000044136254,0.0007119185,0.00007187374,0.00000134332,0.0000044273343,0.0024285656,0.000029168803,0.0059159817,0.9905749,0.00025468564],"study_design_scores_gemma":[0.00006363736,0.000013349324,0.00003285221,0.0005476117,0.000028029943,0.0000019748736,0.000002503311,0.06010718,0.00009075378,0.000030138344,0.9388956,0.00018641152],"about_ca_topic_score_codex":0.000018489864,"about_ca_topic_score_gemma":0.000021529184,"teacher_disagreement_score":0.081717364,"about_ca_system_score_codex":0.00002720525,"about_ca_system_score_gemma":0.000014399728,"threshold_uncertainty_score":0.99975055},"labels":[],"label_agreement":null},{"id":"W4393554173","doi":"10.1007/s12667-024-00654-y","title":"Long-term equilibrium in electricity markets with renewables and energy storage only","year":2024,"lang":"en","type":"article","venue":"Energy Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"St. Olavs Hospital Universitetssykehuset i Trondheim; Norges Teknisk-Naturvitenskapelige Universitet","keywords":"Term (time); Renewable energy; Electricity; Electricity system; Economics; Energy storage; Electricity market; Natural resource economics; Electricity generation; Physics; Engineering; Power (physics); Thermodynamics; Electrical engineering","score_opus":0.003950904151192476,"score_gpt":0.17901715541910765,"score_spread":0.17506625126791517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393554173","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44417244,0.11225796,0.40543747,0.000059599843,0.0033661623,0.0003138523,0.000020392637,0.0025168392,0.031855278],"genre_scores_gemma":[0.9949731,0.0003835861,0.000057555382,0.000008119296,0.00018610287,0.000060253424,0.000027436157,0.00009053378,0.004213288],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99855816,0.000116549694,0.0003376273,0.00035201854,0.00023295048,0.0004026868],"domain_scores_gemma":[0.99949,0.00009834931,0.000035666268,0.00025201158,0.000028268729,0.00009571042],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022175995,0.00025828517,0.00031200235,0.00042010908,0.00002548535,0.00020287346,0.00012987746,0.00014683115,0.000008033185],"category_scores_gemma":[0.000008360597,0.00023362563,0.000027730282,0.0008566778,0.000017300214,0.00028122452,0.000023184366,0.00009220457,0.0000019136032],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000098083336,0.00006982278,0.014801343,0.0023972176,0.00050061423,0.0010909152,0.00037788597,0.94028383,0.00767261,0.010938994,0.010289057,0.011479621],"study_design_scores_gemma":[0.00044384348,0.000112920665,0.0020207434,0.0010341106,0.000030983854,0.0004924108,0.000015912865,0.98174626,0.0018277112,0.000016172236,0.011667948,0.00059096114],"about_ca_topic_score_codex":0.0008161478,"about_ca_topic_score_gemma":0.0010291837,"teacher_disagreement_score":0.5508007,"about_ca_system_score_codex":0.00026677028,"about_ca_system_score_gemma":0.00007929291,"threshold_uncertainty_score":0.95269763},"labels":[],"label_agreement":null},{"id":"W4394875142","doi":"10.1002/9781394205097.ch12","title":"Economic Load Dispatch Solutions at Small, Medium, and Large Scales Utilizing Chaotic Spotted Hyena Optimization","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Hyena; Chaotic; Economic dispatch; Computer science; Mathematical optimization; Environmental science; Mathematics; Ecology; Physics; Electric power system; Artificial intelligence; Biology; Power (physics); Thermodynamics","score_opus":0.009057982368309628,"score_gpt":0.1996631633060348,"score_spread":0.1906051809377252,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394875142","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000114277675,0.02158734,0.3100788,0.00017643947,0.0027267344,0.00093708636,0.00019391744,0.0038067503,0.66037863],"genre_scores_gemma":[0.034039408,0.009531165,0.016991755,0.00008419101,0.0010717071,0.00019439761,0.00086548214,0.0031162978,0.9341056],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985782,0.00002905889,0.0003431825,0.00044514964,0.00013547072,0.00046895293],"domain_scores_gemma":[0.9994228,0.00004138232,0.0000743756,0.00032596767,0.000018753743,0.0001167599],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00017792087,0.00039379546,0.00038763604,0.00038046652,0.00006329016,0.00009361117,0.0001446533,0.00041903832,0.001465865],"category_scores_gemma":[0.00002075427,0.0004057151,0.00006758676,0.00019892032,0.000029231693,0.000080043465,0.0001169373,0.00019350131,0.00071750575],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005542184,0.000027069036,0.0002540863,0.0016096386,0.00052080833,0.0000150158785,0.00020305248,0.17178312,0.0000544047,0.0015291135,0.82350105,0.00049711176],"study_design_scores_gemma":[0.00032791586,0.000012476768,0.00003157442,0.00044069893,0.0001284972,0.00002584736,0.000026138596,0.88898176,0.000022995571,0.000016849932,0.10944838,0.0005368743],"about_ca_topic_score_codex":0.00009840438,"about_ca_topic_score_gemma":0.0045396877,"teacher_disagreement_score":0.7171986,"about_ca_system_score_codex":0.00069335586,"about_ca_system_score_gemma":0.00005075873,"threshold_uncertainty_score":0.9998395},"labels":[],"label_agreement":null},{"id":"W4396967659","doi":"10.1002/nem.2276","title":"A distributed algorithm with network‐independent step‐size and event‐triggered mechanism for economic dispatch problem","year":2024,"lang":"en","type":"article","venue":"International Journal of Network Management","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"National Natural Science Foundation of China","keywords":"Computer science; Mechanism (biology); Event (particle physics); Economic dispatch; Algorithm; Distributed computing","score_opus":0.003308274439550115,"score_gpt":0.20612919699996962,"score_spread":0.2028209225604195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396967659","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00069834484,0.0011554831,0.9942989,0.00036151553,0.0024280115,0.00047545735,0.000035359502,0.00008198794,0.0004649883],"genre_scores_gemma":[0.810587,0.002185244,0.18346953,0.00010601898,0.0026453086,0.00013579393,0.00007784897,0.00011317812,0.00068006397],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998704,0.000023819432,0.00051228324,0.00017206534,0.00032009694,0.0002677338],"domain_scores_gemma":[0.9994654,0.00010659734,0.00015027249,0.00008761084,0.00011352081,0.00007662227],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041806023,0.00017620086,0.00021358428,0.00010957525,0.000037722923,0.00023252271,0.00025687428,0.000048523558,0.000022422983],"category_scores_gemma":[0.0000028257577,0.00015249544,0.000086032866,0.00011197499,0.00000919935,0.00023311203,0.00005454311,0.00013703083,0.0000051686907],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007300865,0.00001958151,0.000075189615,0.0001072721,0.002108009,0.00015527211,0.000033798584,0.9197099,0.0000031218358,0.017275304,0.024788724,0.035650827],"study_design_scores_gemma":[0.001154492,0.000167024,0.00024381296,0.00060885586,0.0001810663,0.00018067505,0.000024368568,0.9697842,0.000010776027,0.0093779145,0.018050728,0.00021611473],"about_ca_topic_score_codex":0.0000034584248,"about_ca_topic_score_gemma":0.000016238555,"teacher_disagreement_score":0.81082934,"about_ca_system_score_codex":0.00045208808,"about_ca_system_score_gemma":0.00002632598,"threshold_uncertainty_score":0.62185836},"labels":[],"label_agreement":null},{"id":"W4398205642","doi":"10.1115/1.887738_ch2","title":"Evaluating Hydro-Québec’s Decarbonization Pathways Using Integrated Asset-Centric Electrical Power System Evolution Modeling","year":2024,"lang":"en","type":"book-chapter","venue":"ASME eBooks","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Asset (computer security); Electric power system; Power (physics); Computer science; Physics; Thermodynamics; Computer security","score_opus":0.027396209615278496,"score_gpt":0.23444869637604318,"score_spread":0.20705248676076468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4398205642","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020869202,0.0071077407,0.5500022,0.0000043248274,0.0020539262,0.0012869871,0.000034093162,0.0026043681,0.4348194],"genre_scores_gemma":[0.9676009,0.000020334348,0.0021072074,0.0000089675195,0.00036104224,0.000050557817,0.0001404368,0.00059397053,0.02911662],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99633634,0.00007484431,0.0012557388,0.00078848656,0.00086402945,0.00068058027],"domain_scores_gemma":[0.99849176,0.000093360366,0.00026930482,0.00056573574,0.00040697568,0.0001728555],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00057867286,0.00083774014,0.0007617665,0.001088952,0.00018029158,0.00021643884,0.0003065078,0.0009481044,0.000036401252],"category_scores_gemma":[0.000066829845,0.00090360845,0.00025954013,0.00027554765,0.000023351633,0.00014470125,0.000076389835,0.0010818231,0.00022300918],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016585229,0.000008417963,0.000006094066,0.00049659214,0.00046200873,0.000072416326,0.0002945542,0.9018025,0.0040974305,0.09018326,0.00017811844,0.002382052],"study_design_scores_gemma":[0.0002719419,0.00008427385,2.8305843e-7,0.001607959,0.00044796322,0.00013211835,0.000021603728,0.99489945,0.00026384305,0.0009485492,0.00051270844,0.00080933166],"about_ca_topic_score_codex":0.00025090296,"about_ca_topic_score_gemma":0.00007839494,"teacher_disagreement_score":0.96551394,"about_ca_system_score_codex":0.0065551614,"about_ca_system_score_gemma":0.00081748725,"threshold_uncertainty_score":0.9993414},"labels":[],"label_agreement":null},{"id":"W4399637406","doi":"10.2139/ssrn.4859994","title":"Alberta's Electricity Futures Market: An Empirical Analysis of Price Formation","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Futures contract; Futures market; Electricity market; Economics; Financial economics; Electricity; Business; Engineering; Electrical engineering","score_opus":0.006220578771200162,"score_gpt":0.24625123445564373,"score_spread":0.24003065568444357,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399637406","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24416439,0.03214142,0.7059099,0.00029761993,0.0018190502,0.00084505446,0.00004533973,0.00058121496,0.014196026],"genre_scores_gemma":[0.9913902,0.0067791515,0.00039696155,0.000019997866,0.00039866575,0.000027247837,0.00013517207,0.0001079048,0.0007446948],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9955475,0.00026873482,0.0011077252,0.0004131304,0.0006315968,0.002031359],"domain_scores_gemma":[0.99853647,0.00012157752,0.00042369906,0.0005269034,0.0002402344,0.00015113215],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.002129034,0.0004922906,0.00087859965,0.0020308855,0.00010611825,0.0001790675,0.0006389836,0.00056668225,0.000076299],"category_scores_gemma":[0.000092120245,0.00047338917,0.00058118446,0.002457151,0.000020037098,0.00027780567,0.00013590066,0.005106175,0.000011411747],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013659042,0.00020052672,0.0009435735,0.0009339456,0.018299628,0.0000114556415,0.0026669125,0.9436285,0.0005118437,0.006475302,0.004852542,0.021339202],"study_design_scores_gemma":[0.0002269326,0.00020522506,0.0007663412,0.000102196056,0.0032376386,0.00019309143,0.00023561262,0.966545,0.0003585819,0.027056305,0.00048866397,0.0005844352],"about_ca_topic_score_codex":0.0002296997,"about_ca_topic_score_gemma":0.0038220685,"teacher_disagreement_score":0.7472258,"about_ca_system_score_codex":0.003355151,"about_ca_system_score_gemma":0.001540697,"threshold_uncertainty_score":0.9997718},"labels":[],"label_agreement":null},{"id":"W4399653803","doi":"10.2172/2371670","title":"Barriers and Opportunities To Realize the System Value of Interregional Transmission","year":2024,"lang":"en","type":"report","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Environment Research Council; Pacific Northwest National Laboratory; Independent Electricity System Operator; National Renewable Energy Laboratory; U.S. Department of Energy","keywords":"Value (mathematics); Transmission (telecommunications); Business; Transmission system; Telecommunications; Computer science; Industrial organization; Environmental economics; Economics","score_opus":0.028767928446873803,"score_gpt":0.24839306372965525,"score_spread":0.21962513528278144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399653803","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00052271277,0.018203994,0.2675447,0.00067531504,0.0035152761,0.0010631054,0.00009919934,0.00097396225,0.70740175],"genre_scores_gemma":[0.9440585,0.00961308,0.0013790865,0.000085798434,0.00038392158,0.00019531493,0.000112207956,0.00032124636,0.04385084],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.998667,0.00004697327,0.00047124273,0.0001853195,0.00047534538,0.00015410381],"domain_scores_gemma":[0.999396,0.00006122992,0.000053316395,0.00023224954,0.00011542341,0.00014175854],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00053954555,0.00022462761,0.00035345904,0.00023684265,0.000028076036,0.000040058025,0.00015628742,0.0001983376,0.000032899683],"category_scores_gemma":[0.00002157513,0.00015007086,0.00008442774,0.00012278918,0.000023587701,0.000038091603,0.000029274745,0.00019325037,0.0000031846748],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003107918,0.0000076041993,0.000021333219,0.036184974,0.0015678412,0.00017968913,0.005510177,0.050462663,0.0005189453,0.037138034,0.82738703,0.040990606],"study_design_scores_gemma":[0.00015799016,0.000116973366,0.000014640021,0.010790947,0.00044678416,0.0009713838,0.0024479865,0.20366636,0.00091668806,0.000062493345,0.779694,0.0007137353],"about_ca_topic_score_codex":0.00016247098,"about_ca_topic_score_gemma":0.000009652092,"teacher_disagreement_score":0.9435358,"about_ca_system_score_codex":0.0003032784,"about_ca_system_score_gemma":0.0003828533,"threshold_uncertainty_score":0.6119712},"labels":[],"label_agreement":null},{"id":"W4400448484","doi":"10.1016/j.epsr.2024.110711","title":"Multi-agent reinforcement learning for multi-area power exchange","year":2024,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Texas A and M Engineering Experiment Station, Texas A and M University","keywords":"Reinforcement learning; Dispatchable generation; Benchmark (surveying); Computer science; Electric power system; Mathematical optimization; Renewable energy; Economic dispatch; Distributed computing; Power (physics); Artificial intelligence; Engineering; Distributed generation; Mathematics","score_opus":0.0721754271301066,"score_gpt":0.33688829147201044,"score_spread":0.26471286434190383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400448484","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020154254,0.050693594,0.9331294,0.000051001905,0.0032548762,0.0035557575,0.0000095927535,0.0016965173,0.0055938554],"genre_scores_gemma":[0.9716225,0.00070810487,0.00085264124,0.000008772597,0.0001553902,0.0017072838,0.00005127979,0.00024798306,0.024645992],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9949376,0.00038667172,0.0008255,0.0007632833,0.0012463107,0.0018406158],"domain_scores_gemma":[0.9979719,0.000521856,0.000059385533,0.0005832634,0.0005431211,0.00032050852],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0035126116,0.00045289868,0.00050349475,0.0016825845,0.00036825577,0.00062260666,0.00055058964,0.00034126503,0.00016529587],"category_scores_gemma":[0.00044003507,0.000438629,0.00020092542,0.002610469,0.000033605178,0.00036707713,0.00009804584,0.0011322098,0.0006310784],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013688591,0.000327926,0.00027858047,0.006633544,0.0016192634,0.00033650492,0.008828374,0.66963345,0.058241766,0.0018942466,0.24632558,0.0057438714],"study_design_scores_gemma":[0.00066345005,0.00038154545,0.00003818404,0.0003191378,0.000016010988,0.000045935052,0.00015040943,0.8393966,0.001259956,0.0000021714754,0.15731776,0.00040881397],"about_ca_topic_score_codex":0.000103044964,"about_ca_topic_score_gemma":0.000008942207,"teacher_disagreement_score":0.9696071,"about_ca_system_score_codex":0.0016467149,"about_ca_system_score_gemma":0.00023125747,"threshold_uncertainty_score":0.9998065},"labels":[],"label_agreement":null},{"id":"W4400898300","doi":"10.55016/ojs/sppp.v17i1.78356","title":"Market Design for the 21st Century: Recommendations for Alberta’s Power Market","year":2024,"lang":"en","type":"article","venue":"The School of Public Policy Publications","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Flexibility (engineering); Renewable energy; Environmental economics; Electricity; Variable renewable energy; Fossil fuel; Electricity market; Supply and demand; Electricity generation; Mains electricity; Natural resource economics; Wind power; Natural gas prices; Business; Economics; Electric power system; Engineering; Power (physics); Microeconomics; Waste management","score_opus":0.030875794170692975,"score_gpt":0.2820021588394843,"score_spread":0.25112636466879135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400898300","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000008807339,0.0023831266,0.6842903,0.18863265,0.00093561143,0.0030883995,0.00049537723,0.00058006065,0.1195857],"genre_scores_gemma":[0.82001454,0.0045539993,0.041263953,0.0023224186,0.0026203282,0.020867413,0.0008862005,0.0006223397,0.106848784],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982518,0.00017369978,0.0005580139,0.00026184204,0.00020273025,0.0005519096],"domain_scores_gemma":[0.9947462,0.0036696284,0.000111611516,0.000918753,0.00038218862,0.00017163104],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.002120622,0.0002256261,0.00019914229,0.00059770944,0.00037272146,0.00057950174,0.0009417697,0.0001174114,0.00097546517],"category_scores_gemma":[0.0032133795,0.00015566101,0.00017638637,0.0020180945,0.000075220836,0.0007272325,0.00005344491,0.00021088315,0.000041561936],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004972104,0.000024247518,0.000008166568,0.00004607167,0.00025516053,8.67326e-9,0.00016395324,0.000570308,0.000047580237,0.19204058,0.80211514,0.004723827],"study_design_scores_gemma":[0.00021767127,0.00003382293,0.00034306775,0.000025581863,0.00007680074,0.000007813433,0.00019092612,0.1153048,0.000044519024,0.0026585374,0.88093156,0.00016492177],"about_ca_topic_score_codex":0.00012808217,"about_ca_topic_score_gemma":0.00006467983,"teacher_disagreement_score":0.8200058,"about_ca_system_score_codex":0.00031777952,"about_ca_system_score_gemma":0.0006866098,"threshold_uncertainty_score":0.9999378},"labels":[],"label_agreement":null},{"id":"W4401222465","doi":"10.1016/j.epsr.2024.110932","title":"Demand response assisted energy and reserve procurement in renewable integrated dynamic energy market","year":2024,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Renewable energy; Demand response; Procurement; Energy market; Variable renewable energy; Environmental economics; Energy demand; Energy (signal processing); Natural resource economics; Business; Economics; Electric power system; Engineering; Electrical engineering; Power (physics); Electricity","score_opus":0.014337590506021703,"score_gpt":0.27230078665701485,"score_spread":0.25796319615099317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401222465","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11030176,0.4674321,0.33492234,0.00087440526,0.004218565,0.0036431553,0.00007107082,0.0036552697,0.07488132],"genre_scores_gemma":[0.9781313,0.0017454039,0.00007125559,0.000005990727,0.000036571186,0.0005487547,0.000024791181,0.0001340839,0.019301875],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99393183,0.002121722,0.00080234034,0.00075163785,0.001115121,0.001277345],"domain_scores_gemma":[0.9978891,0.00095248397,0.00004409797,0.00055829214,0.00031785248,0.00023816097],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0061458815,0.00037267548,0.0004867528,0.0028964397,0.00013950453,0.0005629412,0.00041280253,0.00035150966,0.00005698328],"category_scores_gemma":[0.00046096288,0.0003518874,0.00005939255,0.0059761694,0.000045528224,0.00033953163,0.0000936174,0.00059354305,0.0000139744025],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003980486,0.0005162372,0.00091194053,0.004408332,0.001551366,0.0032073015,0.0022856295,0.07385296,0.27691388,0.004573102,0.61011636,0.01768241],"study_design_scores_gemma":[0.00048187608,0.00033798604,0.00033795857,0.00081043615,0.000010026395,0.00019359484,0.00009777108,0.902162,0.0023247423,0.00009318434,0.092765495,0.00038493564],"about_ca_topic_score_codex":0.0026692862,"about_ca_topic_score_gemma":0.0011383396,"teacher_disagreement_score":0.8678295,"about_ca_system_score_codex":0.0021004658,"about_ca_system_score_gemma":0.0005113404,"threshold_uncertainty_score":0.9998933},"labels":[],"label_agreement":null},{"id":"W4401893304","doi":"10.1007/s10957-024-02518-y","title":"An Adaptive Distributionally Robust Optimization Approach for Optimal Sizing of Hybrid Renewable Energy Systems","year":2024,"lang":"en","type":"article","venue":"Journal of Optimization Theory and Applications","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Sizing; Mathematical optimization; Renewable energy; Robust optimization; Theory of computation; Stochastic programming; Mathematics; Computer science; Engineering; Algorithm","score_opus":0.008154231816268995,"score_gpt":0.21059023431970939,"score_spread":0.2024360025034404,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401893304","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000037928236,0.0045399354,0.9938819,0.000010731907,0.0001507205,0.00039459637,0.0001005213,0.000105938176,0.00077775976],"genre_scores_gemma":[0.583736,0.0007716189,0.41436437,0.000007732518,0.00031506477,0.00020592811,0.00043115596,0.000063647974,0.00010448893],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99863505,0.0001138964,0.0007025174,0.00019167025,0.00019189923,0.0001649834],"domain_scores_gemma":[0.9987144,0.0002582741,0.00026613325,0.00016933249,0.00048708686,0.00010477912],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008557386,0.00017325228,0.00028579246,0.0002835163,0.00012693554,0.00013528895,0.00017526012,0.00008231557,0.000010256685],"category_scores_gemma":[0.000037910977,0.0001686883,0.00008529681,0.0004813811,0.000050544037,0.00064707134,0.000011303958,0.00010042561,1.3245426e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006644921,0.00006111443,0.0000022035822,0.00016344334,0.00012099679,6.406641e-7,0.00004844007,0.9579653,0.00018404769,0.040654916,0.00020155744,0.00053084834],"study_design_scores_gemma":[0.00025685795,0.00014269685,6.7594414e-7,0.000088982444,0.00013046272,0.00011674365,0.00019257607,0.99727577,0.000895105,0.00040260697,0.0003380615,0.00015944075],"about_ca_topic_score_codex":0.0000034442503,"about_ca_topic_score_gemma":1.6838372e-7,"teacher_disagreement_score":0.58369803,"about_ca_system_score_codex":0.00010789685,"about_ca_system_score_gemma":0.00009302859,"threshold_uncertainty_score":0.68789095},"labels":[],"label_agreement":null},{"id":"W4402642962","doi":"10.1080/03155986.2026.2657103","title":"Can an EV storage system exercise market power in an electricity market? A comparison of bi-level and single-level models","year":2024,"lang":"en","type":"preprint","venue":"INFOR Information Systems and Operational Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ford Motor Company; National Science Foundation","keywords":"Electricity market; Electricity; Power (physics); Business; Electrical engineering; Engineering; Physics; Thermodynamics","score_opus":0.08677483552171619,"score_gpt":0.3227296239763287,"score_spread":0.2359547884546125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402642962","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.770985,0.010491508,0.14634229,0.00012942025,0.0025647935,0.012043093,0.0062448597,0.0008513151,0.05034773],"genre_scores_gemma":[0.9975385,0.00015355917,0.0009623538,0.0000051549223,0.000063697844,0.0004720835,0.000564214,0.0000480884,0.00019232155],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9955205,0.0003292643,0.0018067263,0.000356419,0.0014686327,0.0005184668],"domain_scores_gemma":[0.9974434,0.00027621948,0.00022598381,0.00048366075,0.0013018713,0.00026891078],"candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.003728228,0.0004059579,0.00076875935,0.0019807091,0.00017237176,0.0013376605,0.00036203416,0.0005791997,0.000016764669],"category_scores_gemma":[0.00013628481,0.00040158952,0.000050797174,0.00077732775,0.000071157025,0.002463747,0.00025071466,0.0010714404,0.000006185918],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025561228,0.00010199858,0.0011248317,0.012949167,0.00013412176,0.000006080364,0.013330367,0.9481927,0.00016360765,0.01433686,0.0030860018,0.0063186535],"study_design_scores_gemma":[0.00042674431,0.0001584578,0.001014257,0.001735665,0.000015022187,0.000027247781,0.0022557846,0.99357504,0.00010460418,0.000116522424,0.0001934607,0.00037719126],"about_ca_topic_score_codex":0.0015667285,"about_ca_topic_score_gemma":0.00029271698,"teacher_disagreement_score":0.22655354,"about_ca_system_score_codex":0.0009023874,"about_ca_system_score_gemma":0.0005826496,"threshold_uncertainty_score":0.9998436},"labels":[],"label_agreement":null},{"id":"W4403928111","doi":"10.2139/ssrn.5006488","title":"The Stochastic Behavior of Electricity Prices Under Scrutiny: Evidence from Spot and Futures Markets","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Scrutiny; Futures contract; Spot contract; Economics; Electricity; Financial economics; Econometrics; Engineering; Political science; Law; Electrical engineering","score_opus":0.008683515022428938,"score_gpt":0.23448600784176374,"score_spread":0.2258024928193348,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403928111","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5759441,0.27949336,0.14180788,0.00020383787,0.0016060799,0.0006196556,0.000017860364,0.00018576518,0.000121410085],"genre_scores_gemma":[0.9622121,0.036809526,0.00020605733,0.0000059816566,0.0004518211,0.000049114085,0.000007282037,0.000092220886,0.00016589201],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99647725,0.00015763777,0.0007243602,0.00040464583,0.0005543973,0.0016817364],"domain_scores_gemma":[0.9984575,0.00053753256,0.00034201803,0.00041132577,0.00015213821,0.00009950819],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0019805685,0.00043712612,0.0004715827,0.00026656163,0.00022542586,0.00028828694,0.00065696804,0.00034671088,0.000008545102],"category_scores_gemma":[0.00016841978,0.00033673353,0.00017154704,0.00036360085,0.00006639376,0.000120940764,0.00028130802,0.0050698835,0.0000059017057],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010876117,0.00035855352,0.0033721845,0.0024726074,0.012923283,0.00009722449,0.0041393437,0.6453088,0.021116454,0.05116099,0.0034383042,0.25452462],"study_design_scores_gemma":[0.0015786277,0.00087885925,0.027049456,0.006204636,0.0049586636,0.0019443873,0.0021887491,0.3592116,0.004265869,0.58825517,0.00017057678,0.003293412],"about_ca_topic_score_codex":0.0001618375,"about_ca_topic_score_gemma":0.0007615226,"teacher_disagreement_score":0.5370942,"about_ca_system_score_codex":0.0014592052,"about_ca_system_score_gemma":0.0017389246,"threshold_uncertainty_score":0.99990845},"labels":[],"label_agreement":null},{"id":"W4403967613","doi":"10.2139/ssrn.5007070","title":"Monthly and Quarter-Hourly Hydro Scheduling for Assessing Retrofit of Conventional to Reversible Turbines with Wind and Pv Integration","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Quarter (Canadian coin); Environmental science; Scheduling (production processes); Meteorology; Computer science; Marine engineering; Automotive engineering; Engineering; Operations management; Electrical engineering; History; Geography","score_opus":0.006779968174788365,"score_gpt":0.229129152399914,"score_spread":0.22234918422512562,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403967613","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.526761,0.0119204195,0.45967093,0.00037259358,0.00044923453,0.0005114446,0.000021221218,0.00008192169,0.00021124545],"genre_scores_gemma":[0.98978186,0.0006117726,0.009144069,0.00000818981,0.00022274675,0.000018174616,0.000037482816,0.000067821675,0.00010789885],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982035,0.000040704763,0.00045679323,0.00030188524,0.00024116437,0.00075594906],"domain_scores_gemma":[0.9993753,0.00006187457,0.0001485988,0.00013460625,0.00019632235,0.00008330078],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010113779,0.00027766524,0.00038744774,0.00040864144,0.000087990935,0.00024464494,0.00012411256,0.00020329627,0.0000020122466],"category_scores_gemma":[0.00004639865,0.00025461536,0.00007876822,0.00021549223,0.000023470626,0.00021384537,0.0000554535,0.0015730363,7.77657e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004962662,0.00008889469,0.004185253,0.00464411,0.003627291,0.000016155158,0.0025712121,0.917557,0.016637921,0.032412764,0.0011038483,0.016659297],"study_design_scores_gemma":[0.0021885408,0.0014177217,0.00082565186,0.005912545,0.0008568757,0.0007301508,0.0026084904,0.8782238,0.0034696534,0.10242811,0.00015168938,0.0011868217],"about_ca_topic_score_codex":0.000024548917,"about_ca_topic_score_gemma":0.0001448787,"teacher_disagreement_score":0.46302086,"about_ca_system_score_codex":0.00068941317,"about_ca_system_score_gemma":0.00077982835,"threshold_uncertainty_score":0.9999906},"labels":[],"label_agreement":null},{"id":"W4404056536","doi":"10.1016/j.ejor.2024.10.033","title":"On the valuation of legacy power production in liberalized markets via option-pricing","year":2024,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Valuation (finance); Production (economics); Economics; Microeconomics; Business; Variable pricing; Industrial organization; Financial economics; Finance","score_opus":0.05150839692378708,"score_gpt":0.3160417182370171,"score_spread":0.26453332131323004,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404056536","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88941604,0.001901697,0.0802357,0.003748351,0.0014623924,0.000609217,0.0000019829906,0.000047038004,0.022577574],"genre_scores_gemma":[0.99855125,0.00010753104,0.00069765595,0.000013467135,0.00018718865,0.000004053222,0.0000032485773,0.00003175329,0.00040382415],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99701625,0.0012553986,0.00054057734,0.00011252419,0.00092037336,0.00015489006],"domain_scores_gemma":[0.99877906,0.00046045933,0.00004831398,0.00013069533,0.000545199,0.000036281526],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009118427,0.00008109359,0.00011051747,0.0006020275,0.00007103299,0.0001699057,0.00018916732,0.000019022786,0.00016806231],"category_scores_gemma":[0.0009874161,0.000057976133,0.00004718898,0.0007933844,0.000029343924,0.0005273349,0.000018949942,0.000514422,0.000064179956],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019048835,0.00009432283,0.00007224285,0.000116533345,0.000119532815,0.00009910905,0.0024453765,0.8947515,0.061485678,0.016051117,0.013739791,0.010834312],"study_design_scores_gemma":[0.0013001653,0.0009525371,0.02290135,0.0025169898,0.000025546424,0.00039479672,0.0003464306,0.9368571,0.026376639,0.003224738,0.0047295447,0.00037417954],"about_ca_topic_score_codex":0.0000018242188,"about_ca_topic_score_gemma":7.2066945e-7,"teacher_disagreement_score":0.109135225,"about_ca_system_score_codex":0.00021724029,"about_ca_system_score_gemma":0.0001256695,"threshold_uncertainty_score":0.31602827},"labels":[],"label_agreement":null},{"id":"W4404345647","doi":"10.2139/ssrn.4976130","title":"Extremal Dependence in Australian Electricity Markets","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Electricity; Economics; Business; Agricultural economics; Engineering; Electrical engineering","score_opus":0.007896446523018777,"score_gpt":0.22563912704569675,"score_spread":0.21774268052267798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404345647","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6373216,0.14739981,0.16856015,0.001474976,0.011692817,0.0026496598,0.00004697607,0.0026250598,0.028228959],"genre_scores_gemma":[0.9842899,0.012059781,0.00026393187,0.000010634752,0.00048501175,0.00004325921,0.00001619686,0.0001557009,0.0026756066],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99402416,0.00018523315,0.0008678862,0.00054320606,0.00055859867,0.0038208943],"domain_scores_gemma":[0.9991401,0.000059614536,0.00016205566,0.0004087283,0.000083292616,0.00014620865],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0025731788,0.00057707046,0.0005661099,0.0009621523,0.00006547131,0.00026677764,0.00077642995,0.00065412617,0.000049118345],"category_scores_gemma":[0.00007585075,0.00061459176,0.00024323993,0.0008370565,0.000020600099,0.00015518598,0.00021350442,0.013231735,0.000106177045],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032763992,0.00036791502,0.0055579683,0.0031313677,0.0036995523,0.0013464825,0.001408081,0.7577691,0.0034821534,0.056332506,0.009177376,0.15739988],"study_design_scores_gemma":[0.0014970422,0.00031223532,0.0018388893,0.0020907915,0.00040954293,0.0059917914,0.0003540966,0.33836052,0.001590049,0.64226085,0.0022399458,0.0030542705],"about_ca_topic_score_codex":0.00010733604,"about_ca_topic_score_gemma":0.0021253794,"teacher_disagreement_score":0.5859283,"about_ca_system_score_codex":0.0069443434,"about_ca_system_score_gemma":0.0029789368,"threshold_uncertainty_score":0.9996306},"labels":[],"label_agreement":null},{"id":"W4404694283","doi":"10.1016/j.apenergy.2024.124923","title":"Feasibility-guaranteed machine learning unit commitment: Fuzzy Optimization approaches","year":2024,"lang":"en","type":"article","venue":"Applied Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; Toronto Metropolitan University","funders":"","keywords":"Unit (ring theory); Fuzzy logic; Power system simulation; Computer science; Artificial intelligence; Engineering; Mathematical optimization; Mathematics; Electric power system; Mathematics education; Physics","score_opus":0.022772150099923005,"score_gpt":0.2057186705244642,"score_spread":0.18294652042454118,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404694283","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010326251,0.003703717,0.83913344,0.00003130322,0.00038787303,0.0002330066,0.0000067169844,0.0023077794,0.15316352],"genre_scores_gemma":[0.9945319,0.00015173323,0.0041384934,0.000026240874,0.000104447194,0.0001021802,0.00027731626,0.000102604805,0.00056503125],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988816,0.000044811848,0.0002899959,0.00030352408,0.0001871763,0.00029288427],"domain_scores_gemma":[0.99957377,0.00007104272,0.000026799773,0.00024561863,0.000017508375,0.0000652492],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018942171,0.00023539134,0.00020935634,0.00021065815,0.00009065756,0.00012919863,0.00015231718,0.00013069327,0.000069356065],"category_scores_gemma":[0.000008743751,0.00024106076,0.00005282914,0.00072847604,0.000021080266,0.00011563284,0.00003052217,0.00022144237,0.00003665674],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006532318,0.000020086947,0.00008014033,0.000100779616,0.00007294112,0.0000035601422,0.00018194686,0.961303,0.00027092584,0.034125425,0.00026725014,0.003567393],"study_design_scores_gemma":[0.00026625238,0.000020704747,0.000011916446,0.000028093455,0.00003138079,0.000009869839,0.000037467496,0.98840445,0.0013062451,0.00029126953,0.009341818,0.00025055173],"about_ca_topic_score_codex":0.000041568896,"about_ca_topic_score_gemma":0.00002363411,"teacher_disagreement_score":0.99349934,"about_ca_system_score_codex":0.00014399052,"about_ca_system_score_gemma":0.000019374542,"threshold_uncertainty_score":0.9830172},"labels":[],"label_agreement":null},{"id":"W4405400437","doi":"10.3808/jeil.202400140","title":"A Factorial Fractional Chance-Constrained Programming Model for Regional Electricity Systems Management under GHG Emission Mitigation — A Case Study of Saskatchewan, Canada","year":2024,"lang":"en","type":"article","venue":"Journal of Environmental Informatics Letters","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Regina","funders":"Natural Resources Canada; SaskPower; Mitacs; Government of Canada","keywords":"Greenhouse gas; Fractional factorial design; Electricity; Electricity system; Factorial; Factorial analysis; Environmental science; Operations research; Econometrics; Factorial experiment; Electricity generation; Economics; Engineering; Mathematics; Statistics; Power (physics); Ecology","score_opus":0.008757628941817456,"score_gpt":0.20330973402786054,"score_spread":0.1945521050860431,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405400437","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5630559,0.000079614794,0.43579528,0.00002772356,0.00051425485,0.00048500617,0.000018682722,0.000015307645,0.000008259334],"genre_scores_gemma":[0.9962146,0.000012111279,0.0035130775,0.000045418932,0.0001261226,0.000029521645,0.000017729633,0.000021003947,0.00002040993],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983057,0.000019343322,0.00088598684,0.00006616549,0.00053665234,0.00018615999],"domain_scores_gemma":[0.9994444,0.00007144571,0.0003057751,0.00008389869,0.000019071476,0.00007537318],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023839308,0.00015801066,0.00021746491,0.0001943824,0.00006094027,0.000054668148,0.00008739149,0.000051533443,0.00000275851],"category_scores_gemma":[0.0000033131416,0.00014832919,0.00007229161,0.00013320587,0.000014824082,0.00042795506,0.000011719191,0.00018830343,2.1842173e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027382379,0.00007368048,0.000054847103,0.00042847593,0.00037536141,0.00008475416,0.00394241,0.989287,0.0027640276,0.000008345727,0.001743527,0.0012101983],"study_design_scores_gemma":[0.0008249874,0.0001335904,0.00002923737,0.0001438852,0.000115718336,0.0009178205,0.015544761,0.9816654,0.00021806605,0.0000053809986,0.00025094367,0.00015020868],"about_ca_topic_score_codex":0.0008525506,"about_ca_topic_score_gemma":0.00076687033,"teacher_disagreement_score":0.43315873,"about_ca_system_score_codex":0.001046957,"about_ca_system_score_gemma":0.00009164593,"threshold_uncertainty_score":0.6048688},"labels":[],"label_agreement":null},{"id":"W4406290668","doi":"10.5267/j.ac.2024.10.002","title":"Exploring the evolution of scientific publication on portfolio optimization in the light of artificial intelligence: A bibliometric study","year":2025,"lang":"en","type":"article","venue":"Accounting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Portfolio; Field (mathematics); Data science; Computer science; Transformative learning; Context (archaeology); Management science; Bibliometrics; Artificial intelligence; Knowledge management; Sociology; Data mining; Engineering","score_opus":0.03909395225912605,"score_gpt":0.2645421556346679,"score_spread":0.22544820337554183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406290668","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.807959,0.00023197503,0.18559678,0.00012333936,0.00077001407,0.00083509897,0.0000011001376,0.00007181293,0.0044108424],"genre_scores_gemma":[0.99960035,0.000013405757,0.00021943609,0.0000058495552,0.000031706924,0.00009927954,0.000005430635,0.000010164674,0.000014401907],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99856764,0.000085949054,0.0006102116,0.00016981512,0.00040282236,0.00016358319],"domain_scores_gemma":[0.9989541,0.00018472607,0.00017304861,0.0003764551,0.0003043138,0.00000735396],"candidate_categories":["bibliometrics"],"consensus_categories":["bibliometrics"],"category_scores_codex":[0.0023209031,0.00009449001,0.00013306088,0.013512798,0.00011669501,0.0001537574,0.000369641,0.000034270226,0.0000064270826],"category_scores_gemma":[0.0006258577,0.00006880391,0.000032699176,0.073289655,0.000024021923,0.00053797907,0.000030082452,0.0001338181,0.0000026577725],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000090697085,0.00019471768,0.010289451,0.00007391991,0.000027813847,2.9338756e-7,0.001831231,0.95851904,0.0010249999,0.006705774,0.00017726424,0.021146402],"study_design_scores_gemma":[0.00011411018,0.00006331185,0.034069255,0.0001518448,0.00004316009,9.751265e-7,0.005392691,0.95319325,0.0065150834,0.00024611186,0.00007660833,0.00013359627],"about_ca_topic_score_codex":0.00007258284,"about_ca_topic_score_gemma":0.000021219874,"teacher_disagreement_score":0.19164129,"about_ca_system_score_codex":0.00015914235,"about_ca_system_score_gemma":0.000051870018,"threshold_uncertainty_score":0.9976682},"labels":[],"label_agreement":null},{"id":"W4406354569","doi":"10.1109/tpwrs.2025.3528864","title":"Generation Planning and Operation Under Power Stability Constraints: A Hydro-Quebec Use Case","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Electric power system; Stability (learning theory); Electricity generation; Power (physics); Control theory (sociology); Computer science; Engineering; Operations research; Reliability engineering; Control engineering; Mathematical optimization; Mathematics; Control (management)","score_opus":0.02629836294089091,"score_gpt":0.24203929074780411,"score_spread":0.2157409278069132,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406354569","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14977422,0.0003146588,0.84513074,0.000035864712,0.0026014175,0.0006903137,0.000047083588,0.00038739163,0.0010183258],"genre_scores_gemma":[0.99901235,0.000012261743,0.00023686218,0.00005787245,0.000012311683,0.00012774362,0.000010912274,0.000039362985,0.00049034937],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984267,0.00016988069,0.00054668525,0.00038353584,0.00019146771,0.00028175442],"domain_scores_gemma":[0.9992109,0.00014663424,0.000052574218,0.00038029614,0.000112660724,0.000096957985],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00030427164,0.00028126387,0.00028991196,0.00033102086,0.00025960724,0.00035679404,0.00007005889,0.0002230088,0.000057835157],"category_scores_gemma":[0.000009615608,0.00029777244,0.000059882757,0.00038108422,0.0000643138,0.0006373198,0.0000011154483,0.00026289013,0.00001402265],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018404004,0.00007070729,0.0000945834,0.00010578199,0.00018451978,0.00006535347,0.0012583338,0.9882116,0.0085833,0.000504959,0.0006313149,0.00027115853],"study_design_scores_gemma":[0.0012528863,0.00013014486,0.00015206778,0.0003041192,0.00010011115,0.0009034689,0.0015605339,0.9757417,0.018423129,0.0000062329223,0.00077496195,0.0006506313],"about_ca_topic_score_codex":0.0007256769,"about_ca_topic_score_gemma":0.00065512134,"teacher_disagreement_score":0.8492381,"about_ca_system_score_codex":0.0004507915,"about_ca_system_score_gemma":0.00008434886,"threshold_uncertainty_score":0.9999474},"labels":[],"label_agreement":null},{"id":"W4406822216","doi":"10.1016/j.eneco.2025.108221","title":"Risk mitigation in project finance for utility-scale solar PV projects","year":2025,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University; Canada Excellence Research Chairs, Government of Canada; Shahid Beheshti University","keywords":"Scale (ratio); Project finance; Finance; Economics; Photovoltaic system; Environmental economics; Business; Actuarial science; Engineering; Geography","score_opus":0.0049692886690174895,"score_gpt":0.1928547736117314,"score_spread":0.1878854849427139,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406822216","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5054134,0.0006123861,0.47990373,0.00005363849,0.00093817536,0.0006526134,0.00004199719,0.00023473264,0.01214931],"genre_scores_gemma":[0.9927346,0.0005363402,0.0056269565,0.000030413226,0.000051211475,0.0003197945,0.00005071632,0.000026031734,0.00062389876],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999287,0.000022986296,0.00027577745,0.00019862682,0.000017578917,0.00019802286],"domain_scores_gemma":[0.9996712,0.000058005113,0.000051788287,0.00018680817,0.000022990773,0.000009210369],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018219065,0.00011121053,0.00016339256,0.00018593494,0.00003902007,0.000027641052,0.00009998704,0.00010325434,0.0000014576304],"category_scores_gemma":[0.00003519172,0.00013857755,0.00004076975,0.0002215777,0.000009427174,0.00015354417,0.00001218291,0.00006925851,0.0000010649038],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005138352,0.00006647585,0.02478621,0.00023596258,0.00008293041,7.0184655e-7,0.00057406345,0.9067703,0.00009900829,0.009171286,0.0053857714,0.052775916],"study_design_scores_gemma":[0.0004186408,0.000015406455,0.0006392266,0.00002603833,0.0000072547373,4.852487e-7,0.000023975279,0.96485454,0.007451224,0.0011710578,0.025265245,0.00012690382],"about_ca_topic_score_codex":0.00010721957,"about_ca_topic_score_gemma":0.0009250864,"teacher_disagreement_score":0.4873212,"about_ca_system_score_codex":0.0002173461,"about_ca_system_score_gemma":0.000078321624,"threshold_uncertainty_score":0.5651029},"labels":[],"label_agreement":null},{"id":"W4407184618","doi":"10.1111/1756-2171.12488","title":"Strategic Reneging and Market Power in Sequential Markets","year":2025,"lang":"en","type":"article","venue":"The RAND Journal of Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"HEC Montréal","funders":"Agence Nationale de la Recherche","keywords":"Market power; Economics; Microeconomics; Power (physics); Industrial organization; Business; Monopoly","score_opus":0.0072641100080446915,"score_gpt":0.19232829594239595,"score_spread":0.18506418593435126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407184618","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9571402,0.0019702294,0.0020798803,0.00016110949,0.0005374453,0.00006300254,8.730126e-7,0.0000069044004,0.03804037],"genre_scores_gemma":[0.9984646,0.001199875,0.00015230398,0.000021583444,0.00003094692,5.7687043e-7,1.5808925e-7,0.0000069225403,0.0001230474],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952483,0.00003811935,0.00028730737,0.000039630075,0.000016693311,0.00009339908],"domain_scores_gemma":[0.9997584,0.000072316296,0.0000681053,0.00006743284,0.000014373603,0.000019320278],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064555096,0.00006031147,0.00014384877,0.00013164437,0.000020184167,0.00004577092,0.00008735807,0.000034543966,0.000024854444],"category_scores_gemma":[0.000010049219,0.000048346894,0.000027550539,0.00007286827,0.0000114752365,0.00010721832,0.000009651793,0.00011993516,4.2610756e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011295642,0.000051753163,0.007075093,0.00026425073,0.0008035511,0.000056674508,0.0013238232,0.9567459,0.0010508634,0.012257148,0.0065376996,0.012703633],"study_design_scores_gemma":[0.007453367,0.00009729297,0.0125526255,0.00052938826,0.00012833018,0.0005057195,0.0006430844,0.94884706,0.001176224,0.023316193,0.004298895,0.00045180303],"about_ca_topic_score_codex":0.0000017881058,"about_ca_topic_score_gemma":0.000011332383,"teacher_disagreement_score":0.0413244,"about_ca_system_score_codex":0.000082399776,"about_ca_system_score_gemma":0.000035313707,"threshold_uncertainty_score":0.19715291},"labels":[],"label_agreement":null},{"id":"W4407253046","doi":"10.1016/j.eneco.2025.108284","title":"Alberta's electricity futures market: An empirical analysis of price formation","year":2025,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto; Carleton University","funders":"","keywords":"Futures contract; Futures market; Economics; Electricity market; Electricity; Financial economics; Econometrics; Engineering","score_opus":0.003919542320279362,"score_gpt":0.20489002616920562,"score_spread":0.20097048384892627,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407253046","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35654202,0.00034415504,0.5570999,0.000055311353,0.00032086694,0.00007796857,0.000007831788,0.00013091574,0.085421056],"genre_scores_gemma":[0.9981764,0.00020651775,0.0007638465,0.00007395945,0.000029786564,0.000011913675,0.00007021278,0.000012835157,0.00065452995],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993138,0.000034250123,0.00034202405,0.00012819878,0.000031830634,0.00014992189],"domain_scores_gemma":[0.9995435,0.000079226,0.00007347614,0.00023461896,0.000033607044,0.000035565296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011946685,0.00010376412,0.00024926048,0.00055484805,0.000033335997,0.000022708984,0.00013491984,0.00010014085,0.00004805695],"category_scores_gemma":[0.000020483534,0.0001182692,0.00008112955,0.0009184986,0.0000065723016,0.00024129894,0.000011941934,0.00004884853,6.443575e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016830678,0.000032323776,0.005361069,0.00002752981,0.0007614665,1.5816181e-7,0.00018504873,0.98166203,0.00008434937,0.0029681514,0.0031576029,0.00574345],"study_design_scores_gemma":[0.00010226482,0.000013268145,0.003527276,0.000002794948,0.00014724805,4.953085e-7,0.000015514473,0.9843371,0.0032113371,0.00010138829,0.008440808,0.000100540936],"about_ca_topic_score_codex":0.00020363444,"about_ca_topic_score_gemma":0.0017295037,"teacher_disagreement_score":0.64163435,"about_ca_system_score_codex":0.0002037293,"about_ca_system_score_gemma":0.000024377383,"threshold_uncertainty_score":0.4822878},"labels":[],"label_agreement":null},{"id":"W4407852406","doi":"10.1016/j.cor.2025.107024","title":"Bidding in day-ahead electricity markets: A dynamic programming framework","year":2025,"lang":"en","type":"article","venue":"Computers & Operations Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Université de Montréal; Minnow Environmental (Canada)","funders":"","keywords":"Bidding; Electricity; Computer science; Dynamic programming; Electricity market; Operations research; Environmental economics; Mathematical optimization; Business; Microeconomics; Economics; Algorithm; Mathematics; Electrical engineering; Engineering","score_opus":0.015994443215017758,"score_gpt":0.3331045051665095,"score_spread":0.3171100619514918,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407852406","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04055814,0.0011806737,0.9544325,0.00035221534,0.00041645346,0.0008685631,0.000001673138,0.00030882042,0.0018809427],"genre_scores_gemma":[0.95442086,0.00015153416,0.04477675,0.00002846356,0.00003776652,0.00022946656,0.000021946149,0.000028867895,0.00030431943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980049,0.0003517533,0.00036412844,0.0003211856,0.0003300879,0.0006279567],"domain_scores_gemma":[0.9988683,0.0004908113,0.000007791979,0.00037572984,0.00019026542,0.0000671352],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013910915,0.00014871187,0.00019921134,0.0013306671,0.00027380252,0.00035947797,0.00039774925,0.00015264587,0.0000176115],"category_scores_gemma":[0.0003775746,0.00016806704,0.00003770324,0.0041856403,0.000040733998,0.00024005705,0.00010087499,0.000810417,0.000032860476],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010457285,0.00010483206,0.0010131556,0.00014567206,0.00006581175,0.000019703226,0.00088503986,0.8359884,0.00082722685,0.00530867,0.0023053072,0.15332574],"study_design_scores_gemma":[0.00020085512,0.00002629144,0.0019033786,0.00031001793,0.0000029727878,0.0000028146194,0.000044015967,0.9954602,0.00024950533,0.0001553667,0.0015048779,0.00013967416],"about_ca_topic_score_codex":0.000065701104,"about_ca_topic_score_gemma":0.0002055555,"teacher_disagreement_score":0.91386276,"about_ca_system_score_codex":0.0008434443,"about_ca_system_score_gemma":0.0001673762,"threshold_uncertainty_score":0.6853575},"labels":[],"label_agreement":null},{"id":"W4407891073","doi":"10.18280/jesa.580105","title":"A Hybrid Moth Flam Algorithm Based on Particle Swarm Optimization for Unit Commitment Problem Solving","year":2025,"lang":"en","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Particle swarm optimization; Mathematical optimization; Unit (ring theory); Multi-swarm optimization; Computer science; Metaheuristic; Swarm behaviour; Particle (ecology); Algorithm; Mathematics; Biology; Ecology","score_opus":0.011829081164277052,"score_gpt":0.23537201101660096,"score_spread":0.2235429298523239,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407891073","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005305356,0.0005358184,0.9887452,0.00014303897,0.0006265656,0.00090964267,0.00001999995,0.0007272595,0.0029870986],"genre_scores_gemma":[0.62117577,0.00012291233,0.3772148,0.00021894359,0.00017117118,0.00015789749,0.000035801666,0.00014547037,0.00075725396],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979533,0.00018929287,0.0007649876,0.00023307173,0.00034420745,0.0005151312],"domain_scores_gemma":[0.99885863,0.00023432919,0.00020772961,0.00029348346,0.0002628035,0.00014302513],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00065919413,0.0003029292,0.00036796537,0.00034874963,0.00038464766,0.00036303094,0.00027534578,0.00007438922,0.00003959619],"category_scores_gemma":[0.00012838689,0.00029257845,0.00013624415,0.0005447077,0.000028650873,0.00031215415,0.000026842165,0.00024440547,0.000016381378],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013987748,0.00007025588,0.000101961065,0.0003070853,0.00010629318,0.000016264732,0.000110611596,0.9073354,0.00012991753,0.00022172538,0.003162673,0.088423826],"study_design_scores_gemma":[0.0012615075,0.00021923732,0.0009598583,0.00078485586,0.00008325371,0.000065551896,0.000027756487,0.99196184,0.0033306042,0.0004010625,0.00064450275,0.0002599799],"about_ca_topic_score_codex":0.0000050661315,"about_ca_topic_score_gemma":0.0000020514601,"teacher_disagreement_score":0.6158704,"about_ca_system_score_codex":0.0005995073,"about_ca_system_score_gemma":0.0001286842,"threshold_uncertainty_score":0.9999526},"labels":[],"label_agreement":null},{"id":"W4408144902","doi":"10.1109/icjece.2024.3454290","title":"The Gray Wolf Optimization-Based Transmission Expansion Planning in Renewable-Rich Power Systems","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Electrical and Computer Engineering","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Computer science; Gray (unit); Medicine","score_opus":0.003033252617835838,"score_gpt":0.16845063975570443,"score_spread":0.16541738713786858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408144902","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0056305816,0.012485599,0.9808077,0.00008223051,0.0006703337,0.00011216803,4.2745032e-7,0.00003421575,0.00017671059],"genre_scores_gemma":[0.9968313,0.00008419904,0.002974579,0.000026684009,0.00003581464,0.000004802404,0.0000012791706,0.000019238147,0.000022104407],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99899596,0.00003314247,0.00042241544,0.00010014332,0.000111394234,0.0003369726],"domain_scores_gemma":[0.9993536,0.00022660501,0.000044111242,0.00008867884,0.000076455224,0.00021057604],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000248577,0.00014655064,0.00021554584,0.0006178025,0.00009695662,0.00013928565,0.00016590282,0.00009493439,0.000001422828],"category_scores_gemma":[0.000034400007,0.00011741367,0.000037069458,0.0008774995,0.0000088556635,0.00009977256,0.000003517166,0.00027490602,1.5518796e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000048552415,0.000003012579,0.00060505245,0.00003142078,0.00002039952,0.000030812786,0.00006284931,0.99711233,0.000055176515,0.00010620976,0.0005563962,0.0014114558],"study_design_scores_gemma":[0.00032123938,0.000056727255,0.0005132039,0.00036103706,0.0000091378915,0.00003205616,0.0000055448722,0.99551594,0.000105739266,0.0000070674255,0.0029552227,0.000117053045],"about_ca_topic_score_codex":0.00016695312,"about_ca_topic_score_gemma":0.000054066477,"teacher_disagreement_score":0.99120075,"about_ca_system_score_codex":0.00023106523,"about_ca_system_score_gemma":0.00024638706,"threshold_uncertainty_score":0.47879907},"labels":[],"label_agreement":null},{"id":"W4409158386","doi":"10.1016/j.erss.2025.104052","title":"From investment to net benefits: A review of guidelines and methodologies for cost–benefit analysis in the electricity sector","year":2025,"lang":"en","type":"review","venue":"Energy Research & Social Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"H2020 Marie Skłodowska-Curie Actions","keywords":"Investment (military); Electricity; Cost–benefit analysis; Business; Environmental economics; Natural resource economics; Industrial organization; Economics; Risk analysis (engineering); Engineering","score_opus":0.2624884892417818,"score_gpt":0.4851529172078148,"score_spread":0.22266442796603297,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409158386","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000027354035,0.98361695,0.013897904,0.00019083338,0.00007961012,0.0012438446,0.0001043328,0.00002947011,0.00083431887],"genre_scores_gemma":[0.000017786491,0.9937347,0.0046360563,0.00018437448,0.00011596569,0.0011836315,0.000051713712,0.000013969083,0.00006180665],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9963786,0.0008089325,0.0007947239,0.00051713496,0.00093910017,0.0005615344],"domain_scores_gemma":[0.9959402,0.0028023678,0.00013657242,0.00038309972,0.00065446045,0.00008331516],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009838098,0.00023545793,0.0013590938,0.0012280623,0.00020894827,0.00009845196,0.0012416346,0.00015538358,0.0000057178245],"category_scores_gemma":[0.0057031116,0.00016565432,0.00022445805,0.016418755,0.00015339552,0.00009954659,0.0001962193,0.0002600665,3.9709028e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000030816716,0.0000125918605,0.0000023807454,0.012335702,0.000206318,6.765562e-7,0.0001920442,0.0015021672,0.0000050178874,0.009160594,0.0049726325,0.9716068],"study_design_scores_gemma":[0.000148231,0.0001192137,0.000044665903,0.031285524,0.0009724014,0.0000011063096,0.00009027875,0.0048511336,0.000056379286,0.0018072446,0.9600899,0.0005338771],"about_ca_topic_score_codex":0.0011509709,"about_ca_topic_score_gemma":0.00046885625,"teacher_disagreement_score":0.9710729,"about_ca_system_score_codex":0.00051641744,"about_ca_system_score_gemma":0.0006057483,"threshold_uncertainty_score":0.78886676},"labels":[],"label_agreement":null},{"id":"W4409879650","doi":"10.1016/j.eneco.2025.108505","title":"Evaluating the role of information disclosure on bidding behavior in wholesale electricity markets","year":2025,"lang":"en","type":"article","venue":"Energy Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund; Social Sciences and Humanities Research Council of Canada; Fundação de Apoio à Pesquisa do Distrito Federal; Conselho Nacional de Desenvolvimento Científico e Tecnológico","keywords":"Bidding; Electricity; Business; Microeconomics; Industrial organization; Economics","score_opus":0.0056226787192180435,"score_gpt":0.21953681361289196,"score_spread":0.21391413489367392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409879650","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9786659,0.00021611131,0.004353044,0.000021530035,0.00020914592,0.00012967612,0.000004340278,0.000048581533,0.016351657],"genre_scores_gemma":[0.9995605,0.00006701687,0.00020252856,0.000022689039,0.000014993303,0.000057898444,0.00001363201,0.000009132297,0.000051642517],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993974,0.000034730103,0.00032487372,0.00007009168,0.000041416588,0.00013149332],"domain_scores_gemma":[0.99964964,0.000083158186,0.00007209448,0.0001638912,0.000019417648,0.0000117954505],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028843613,0.00008434774,0.00011850368,0.00018062249,0.000031081043,0.000026270147,0.00012739592,0.00006344441,0.000005165471],"category_scores_gemma":[0.000039637373,0.00007979008,0.00003011102,0.00027308214,0.000006813827,0.0002016216,0.000016487427,0.000086037166,0.0000015232671],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000233623,0.00001936519,0.016950577,0.000021256597,0.000023333183,9.719282e-8,0.00012824059,0.8779682,0.0005811296,0.01170899,0.000049279202,0.092526205],"study_design_scores_gemma":[0.00020092029,0.000027562222,0.008842226,0.000027786415,0.000010160235,5.68983e-7,0.00004370143,0.9800827,0.009381591,0.00033863515,0.00096344686,0.00008068613],"about_ca_topic_score_codex":0.000043919397,"about_ca_topic_score_gemma":0.00007642065,"teacher_disagreement_score":0.10211455,"about_ca_system_score_codex":0.00023784103,"about_ca_system_score_gemma":0.000033271743,"threshold_uncertainty_score":0.32537448},"labels":[],"label_agreement":null},{"id":"W4410152917","doi":"10.1109/tii.2025.3563596","title":"DRL-Based Distributed Coordination of ISO and DSOs in Bi-Level Electricity Markets","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Fundamental Research Funds for the Central Universities; National Natural Science Foundation of China","keywords":"Electricity; Business; Computer science; Environmental economics; Electrical engineering; Engineering; Economics","score_opus":0.018928009841710267,"score_gpt":0.2247102045315446,"score_spread":0.20578219468983433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410152917","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06948123,0.000017430886,0.9285393,0.00005653712,0.00045943825,0.00045439886,0.00011350401,0.000110238354,0.0007679285],"genre_scores_gemma":[0.99910635,0.00002163666,0.0007235775,0.000020542166,0.000009259857,0.0000363356,0.000023321756,0.000010620351,0.00004834103],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99882084,0.000045807432,0.0007030416,0.00007009751,0.00016335626,0.00019686378],"domain_scores_gemma":[0.99940723,0.00022058643,0.000098271084,0.0001548642,0.000079136364,0.00003993535],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028993812,0.00015331045,0.00024628208,0.0006897498,0.000056079698,0.00003248801,0.00009561481,0.00026372867,0.000010819102],"category_scores_gemma":[0.00004256975,0.00016936523,0.000040929208,0.0014937593,0.000024968815,0.00025540116,7.872075e-7,0.00036240285,0.0000018769417],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012789074,0.00010884079,0.00027000596,0.00023090004,0.00008078035,5.782426e-7,0.00023469135,0.9613491,0.00037638322,0.000092036345,0.0013528855,0.03577589],"study_design_scores_gemma":[0.0022157298,0.000067726694,0.00031367404,0.00020283146,0.00003990719,0.0000013826545,0.00007501557,0.9500935,0.046597637,0.00002199966,0.00020803486,0.00016257685],"about_ca_topic_score_codex":0.000037693793,"about_ca_topic_score_gemma":0.00002661583,"teacher_disagreement_score":0.92962515,"about_ca_system_score_codex":0.00027038567,"about_ca_system_score_gemma":0.00012189926,"threshold_uncertainty_score":0.69065136},"labels":[],"label_agreement":null},{"id":"W4410502412","doi":"10.3390/su17104618","title":"Toward Sustainable Electricity Markets: Merit-Order Dynamics on Photovoltaic Energy Price Duck Curve and Emissions Displacement","year":2025,"lang":"en","type":"article","venue":"Sustainability","topic":"Electric Power System Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Canada First Research Excellence Fund; University of Alberta","keywords":"Photovoltaic system; Electricity; Economics; Displacement (psychology); Order (exchange); Sustainable energy; Energy (signal processing); Natural resource economics; Environmental economics; Environmental science; Renewable energy; Physics; Engineering; Electrical engineering","score_opus":0.0027660930162676047,"score_gpt":0.21250075532062424,"score_spread":0.20973466230435664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410502412","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22051881,0.0027299207,0.73379225,0.0019587812,0.0006424509,0.0030568116,0.000027477814,0.0013220776,0.03595142],"genre_scores_gemma":[0.98951143,0.0002060624,0.0003353711,0.00008985484,0.000023370994,0.00023465151,0.00003659896,0.000040691542,0.00952195],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99767315,0.0002057166,0.00045972413,0.000547127,0.00026407678,0.00085020176],"domain_scores_gemma":[0.99811053,0.00028273612,0.00006601316,0.000580801,0.00079871935,0.00016120187],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006927275,0.00035540972,0.0003722,0.00033690344,0.0002465378,0.00009801902,0.00022617668,0.00020156703,0.000037235965],"category_scores_gemma":[0.0013898247,0.00036227086,0.000069227404,0.0017648982,0.000067020985,0.00021672166,0.00012698611,0.00030388072,0.0000010659329],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0023811578,0.0031456265,0.08230615,0.02678669,0.0016402032,0.0003719892,0.004464298,0.2202783,0.0016900363,0.5450946,0.064043105,0.04779784],"study_design_scores_gemma":[0.001588892,0.0002891344,0.012018336,0.000119245604,0.00012093422,0.000011018032,0.003082972,0.9171828,0.0036628174,0.02124575,0.03959718,0.0010809138],"about_ca_topic_score_codex":0.00058100774,"about_ca_topic_score_gemma":0.00006172889,"teacher_disagreement_score":0.7689926,"about_ca_system_score_codex":0.005263258,"about_ca_system_score_gemma":0.00055239565,"threshold_uncertainty_score":0.99988294},"labels":[],"label_agreement":null},{"id":"W4411306671","doi":"10.1016/j.ref.2025.100725","title":"A global optimization framework for joint generation and transmission expansion planning with AC power flow representation","year":2025,"lang":"en","type":"article","venue":"Renewable energy focus","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Johns Hopkins University","keywords":"Power flow; Representation (politics); Joint (building); Flow (mathematics); Transmission (telecommunications); Power (physics); Mathematical optimization; Computer science; Control theory (sociology); Mathematics; Electric power system; Engineering; Structural engineering; Telecommunications; Physics; Artificial intelligence; Political science","score_opus":0.010282634316417556,"score_gpt":0.23303077455762375,"score_spread":0.2227481402412062,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411306671","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017822293,0.0023246119,0.9931219,0.000094495015,0.00029639245,0.00026804436,0.0000057562643,0.00028302768,0.0018235092],"genre_scores_gemma":[0.64622766,0.00026745215,0.35274178,0.000044295193,0.00009616139,0.00016148615,0.00013924605,0.000043340937,0.00027855602],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99893457,0.000042191434,0.00029237126,0.00032335782,0.00016580605,0.00024173583],"domain_scores_gemma":[0.99951774,0.000049582817,0.00006055063,0.00020834037,0.000096484815,0.00006728138],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010859108,0.00019883543,0.00021723998,0.00015469459,0.00015105084,0.0000954882,0.0000620065,0.00020233414,0.000010179402],"category_scores_gemma":[0.00003661698,0.00018813075,0.00003851727,0.0006264003,0.000012661084,0.00026354514,0.000011679206,0.000050245013,1.7569597e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053811902,0.000014398237,0.000091279966,0.00004164765,0.0000464994,0.0000017483334,0.00010210213,0.9841998,0.0019357157,0.0008655778,0.0012488811,0.011398524],"study_design_scores_gemma":[0.00062158296,0.00009394908,0.000043721157,0.00027078646,0.00004288274,0.000007750214,0.000035852718,0.9739979,0.02277511,0.0011313073,0.00078148977,0.00019766815],"about_ca_topic_score_codex":0.00017552389,"about_ca_topic_score_gemma":0.00005348127,"teacher_disagreement_score":0.6444455,"about_ca_system_score_codex":0.00017553817,"about_ca_system_score_gemma":0.000054370812,"threshold_uncertainty_score":0.76717496},"labels":[],"label_agreement":null},{"id":"W4411613773","doi":"10.1016/j.energy.2025.137001","title":"Benefits evaluation method for short-term scheduling of cascade hydropower station group in historical data-scarce regions","year":2025,"lang":"en","type":"article","venue":"Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"United Nations University Institute for Water, Environment, and Health","funders":"China Scholarship Council; National Natural Science Foundation of China; Hubei Provincial Department of Education","keywords":"Hydropower; Cascade; Scheduling (production processes); Term (time); Group (periodic table); Operations research; Computer science; Environmental science; Engineering; Operations management; Chemistry; Physics; Electrical engineering","score_opus":0.03705183204511837,"score_gpt":0.3119987737038595,"score_spread":0.2749469416587411,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411613773","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00701575,0.0024650935,0.98893,0.0000559795,0.00052544905,0.00021195819,0.000013643846,0.00007118084,0.0007109339],"genre_scores_gemma":[0.9403199,0.0001189894,0.05870796,0.000014717029,0.000053037627,0.000118592456,0.00050046993,0.000027308073,0.00013900058],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998911,0.00008984814,0.0003831899,0.00024202598,0.00019436322,0.00017955597],"domain_scores_gemma":[0.9992943,0.00017327967,0.000048128193,0.00036410376,0.00009213599,0.000028052566],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007176392,0.00010698392,0.00019282087,0.00030916758,0.000028284372,0.000010441453,0.00018287539,0.00010569369,0.0000044001044],"category_scores_gemma":[0.0001612805,0.00012311435,0.00003180388,0.0005094018,0.000004804365,0.00019113271,0.000029856626,0.00006767687,2.4394865e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012524282,0.00002961517,0.00017039564,0.00006233181,0.000044202174,3.3786407e-7,0.00012787625,0.95466435,0.0039770994,0.009512251,0.0008257449,0.030573249],"study_design_scores_gemma":[0.00033564644,0.000020622845,0.0005603789,0.000069717564,0.0000543401,0.0000012849495,0.000014862921,0.99317783,0.0034747517,0.0003530104,0.0018308475,0.000106718246],"about_ca_topic_score_codex":0.00026220645,"about_ca_topic_score_gemma":0.001038066,"teacher_disagreement_score":0.9333042,"about_ca_system_score_codex":0.00076260976,"about_ca_system_score_gemma":0.000054735017,"threshold_uncertainty_score":0.50204575},"labels":[],"label_agreement":null},{"id":"W4411710847","doi":"10.1016/j.apenergy.2025.126333","title":"Computation of weighted average cost of capital (WACC) in the power sector for African countries and the implications for country-specific electricity technology cost","year":2025,"lang":"en","type":"article","venue":"Applied Energy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"Pokhara University Research Center","keywords":"Weighted average cost of capital; Computation; Electricity; Capital cost; Cost of capital; Economics; Capital (architecture); Power (physics); Econometrics; Business; Engineering; Computer science; Microeconomics; Macroeconomics; Electrical engineering; Financial capital; Capital formation; Economic growth; Human capital; Geography; Algorithm; Thermodynamics","score_opus":0.004414773723426559,"score_gpt":0.19978493221257704,"score_spread":0.19537015848915049,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411710847","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019213324,0.0010517682,0.975108,0.0004108897,0.00008103131,0.0016055295,0.00009549931,0.000066492954,0.0023674353],"genre_scores_gemma":[0.9979359,0.00016451621,0.00056914316,0.00005189529,0.000011268059,0.0011826869,0.000060111925,0.0000152079065,0.000009288137],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992727,0.000019654655,0.00032584785,0.00013815433,0.000071134236,0.00017250037],"domain_scores_gemma":[0.9990107,0.0005753921,0.00010162132,0.00018638805,0.000116180665,0.000009707516],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022073353,0.00011157213,0.00023884873,0.00021907028,0.00007240624,0.000017403238,0.00017758734,0.00010096253,0.000001175102],"category_scores_gemma":[0.000018436667,0.00008295064,0.000027338368,0.0008577366,0.00010477219,0.000028716555,0.000012659308,0.00006331603,1.00062955e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012387885,0.00003459282,0.00008230503,0.00007086434,0.00006261312,4.2192884e-8,0.00042073536,0.01945216,0.002337571,0.9740363,0.001221127,0.0021578097],"study_design_scores_gemma":[0.021232843,0.0004464941,0.006989952,0.00016678874,0.00030007074,0.000020457523,0.0020381657,0.59047776,0.09624109,0.14781345,0.13311853,0.0011543921],"about_ca_topic_score_codex":0.000032784963,"about_ca_topic_score_gemma":0.000094268835,"teacher_disagreement_score":0.9787226,"about_ca_system_score_codex":0.000083128034,"about_ca_system_score_gemma":0.000036976395,"threshold_uncertainty_score":0.33826292},"labels":[],"label_agreement":null},{"id":"W4411787420","doi":"10.3390/jrfm18070355","title":"Arbitrage Returns on the MISO Exchange","year":2025,"lang":"en","type":"article","venue":"Journal of risk and financial management","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Arbitrage; Economics; Monetary economics; Econometrics; Financial economics; Business","score_opus":0.003359225501558689,"score_gpt":0.17740442121253783,"score_spread":0.17404519571097915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411787420","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15372668,0.010809382,0.73245203,0.0011444897,0.0035109196,0.0006426001,0.000008588288,0.00008844925,0.097616844],"genre_scores_gemma":[0.99333656,0.00561408,0.00042502244,0.00015297043,0.00010726198,0.000003969404,2.300569e-7,0.00000656434,0.00035336422],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995371,0.000024546529,0.00019133302,0.000047935075,0.000103673985,0.00009542265],"domain_scores_gemma":[0.99976206,0.000045361277,0.00006337189,0.00008812288,0.00002252258,0.00001859262],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003122517,0.00006904254,0.0001064489,0.00014803551,0.000057161134,0.00002728454,0.00009534623,0.00003037427,0.0000071795557],"category_scores_gemma":[0.00003559334,0.000047384998,0.00004018607,0.00021769205,0.000008015235,0.00004059073,0.000015813326,0.00018659674,0.0000022751226],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019513715,0.00014848418,0.0023160775,0.0007398803,0.00030123017,0.00022217332,0.0025900905,0.02647256,0.000085230204,0.114834085,0.20525388,0.64684117],"study_design_scores_gemma":[0.0020166363,0.0003521249,0.070732936,0.0009657337,0.0003636139,0.00002391943,0.0003968136,0.012150137,0.0007168615,0.012293892,0.89958435,0.00040298846],"about_ca_topic_score_codex":0.0000022989357,"about_ca_topic_score_gemma":0.000005827006,"teacher_disagreement_score":0.83960986,"about_ca_system_score_codex":0.000040198574,"about_ca_system_score_gemma":0.000006225699,"threshold_uncertainty_score":0.19323042},"labels":[],"label_agreement":null},{"id":"W4411924039","doi":"10.1016/j.nexres.2025.100566","title":"Moroccan wind projects status and economic profitability based wind potential of different Moroccan sites","year":2025,"lang":"en","type":"article","venue":"Next research.","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Profitability index; Wind power; Business; Natural resource economics; Environmental science; Economics; Engineering; Finance; Electrical engineering","score_opus":0.025090095430199803,"score_gpt":0.2861648309181341,"score_spread":0.2610747354879343,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411924039","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9950771,0.0005542359,0.00082878966,0.000081511025,0.000121450554,0.0008740793,0.000022681741,0.00009263862,0.0023475552],"genre_scores_gemma":[0.99942416,0.00006630806,0.00025042545,0.0000044480003,0.00003423378,0.00002831655,0.000024567262,0.000024605693,0.00014296119],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983947,0.00017833631,0.00031368955,0.0003110936,0.00027024813,0.000531917],"domain_scores_gemma":[0.9992069,0.0001797675,0.000034275297,0.00034276876,0.00011672259,0.00011954172],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047594134,0.00015974393,0.00026625284,0.0003971352,0.00008093691,0.00008884236,0.0001705864,0.00010241425,0.00006886185],"category_scores_gemma":[0.00010985887,0.00015370628,0.000041869433,0.00030732286,0.00011337203,0.00017318739,0.00008044311,0.00028280745,0.000006325932],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006881256,0.0005276304,0.3829206,0.006193949,0.0005491305,0.00002120386,0.001573174,0.27982202,0.29926607,0.0020277947,0.004406107,0.022004187],"study_design_scores_gemma":[0.0013694543,0.00029751132,0.133506,0.00015434694,0.00002830786,0.0000018074052,0.00022841456,0.80722773,0.056328293,0.00039867396,0.00017955896,0.00027991855],"about_ca_topic_score_codex":0.00031291577,"about_ca_topic_score_gemma":0.00014041385,"teacher_disagreement_score":0.5274057,"about_ca_system_score_codex":0.00043698758,"about_ca_system_score_gemma":0.00026131322,"threshold_uncertainty_score":0.626796},"labels":[],"label_agreement":null},{"id":"W4412651215","doi":"10.1016/j.tej.2025.107484","title":"Electricity market design with increasing renewable generation: Lessons from Alberta","year":2025,"lang":"en","type":"article","venue":"The Electricity Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"SGS (Canada); University of Calgary; University of Alberta","funders":"Social Sciences and Humanities Research Council; Social Sciences and Humanities Research Council of Canada; Canada First Research Excellence Fund; University of Alberta","keywords":"Renewable energy; Electricity market; Electricity generation; Electricity; Electricity retailing; Natural resource economics; Business; Environmental economics; Industrial organization; Economics; Engineering; Power (physics); Electrical engineering","score_opus":0.012836858397250968,"score_gpt":0.21637187137447442,"score_spread":0.20353501297722346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412651215","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029784586,0.0028211453,0.9507341,0.00097004493,0.00034917195,0.00034945618,0.0000021348856,0.0001742112,0.014815167],"genre_scores_gemma":[0.9895933,0.00065956166,0.0068362895,0.00023058812,0.00045600528,0.00002303109,0.000007918493,0.000051391453,0.0021419043],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977371,0.00063493615,0.00044568256,0.00023638837,0.00036080243,0.00058510207],"domain_scores_gemma":[0.998392,0.0008228285,0.00014495887,0.00036092993,0.00017683546,0.00010246869],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012923,0.00028576382,0.00032426533,0.0003167623,0.0006537886,0.00034634248,0.00047972277,0.00013577886,0.0001015679],"category_scores_gemma":[0.0002715743,0.00020816363,0.00007160307,0.0019137028,0.000026631495,0.00029914288,0.000022939403,0.0006888261,0.000009656016],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044971972,0.00010313617,0.0013939908,0.000025116144,0.00097449805,0.000033238073,0.00037164267,0.77273697,0.042692017,0.0004558778,0.16950282,0.011260982],"study_design_scores_gemma":[0.0009044864,0.00012853675,0.00093205675,0.00009814005,0.0002235526,0.0004293163,0.000014541655,0.93705064,0.056193095,0.0011743004,0.0024594616,0.00039185508],"about_ca_topic_score_codex":0.0012011242,"about_ca_topic_score_gemma":0.0005318341,"teacher_disagreement_score":0.9598087,"about_ca_system_score_codex":0.0005517367,"about_ca_system_score_gemma":0.0003294814,"threshold_uncertainty_score":0.8488667},"labels":[],"label_agreement":null},{"id":"W4412699161","doi":"10.3390/en18154019","title":"Price Impacts of Energy Transition on the Interconnected Wholesale Electricity Markets in the Northeast United States","year":2025,"lang":"en","type":"article","venue":"Energies","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"National Natural Science Foundation of China; Ford Foundation","keywords":"Hydroelectricity; Renewable energy; Electricity; Electricity market; Order (exchange); Economics; Business; Agricultural economics; Natural resource economics; Engineering; Finance","score_opus":0.00357005966963644,"score_gpt":0.18419566878972338,"score_spread":0.18062560912008693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412699161","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9807986,0.00046110764,0.013479141,0.0007522726,0.00009692428,0.0001372294,0.000008146828,0.00012097554,0.004145573],"genre_scores_gemma":[0.99927884,0.0002943001,0.000023651497,0.00025525063,0.000012445397,0.000032085572,0.00005110342,0.00001269664,0.000039595605],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991415,0.00021858324,0.00022865528,0.000097307144,0.00013083985,0.00018310169],"domain_scores_gemma":[0.9992158,0.00046810057,0.000038047456,0.0002132248,0.000052824955,0.000011996011],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002776735,0.00012206218,0.00013044322,0.00033968082,0.00004824342,0.000027886264,0.00020405154,0.00005339481,0.000007714858],"category_scores_gemma":[0.0000682451,0.00007812911,0.00003485732,0.0016637758,0.000020902708,0.00007270889,0.000007779948,0.00012326725,7.872531e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010009871,0.00008751543,0.00030565218,0.0001105822,0.000100187506,0.000004113819,0.0032334996,0.975462,0.0032083716,0.012548213,0.003645294,0.0011944337],"study_design_scores_gemma":[0.00096454483,0.00018057518,0.022011627,0.0006192758,0.00005090474,0.000009106296,0.0017261086,0.87466615,0.09279575,0.0008896695,0.0056973854,0.00038886952],"about_ca_topic_score_codex":0.00035809382,"about_ca_topic_score_gemma":0.0003227955,"teacher_disagreement_score":0.10079586,"about_ca_system_score_codex":0.00007355531,"about_ca_system_score_gemma":0.000018699842,"threshold_uncertainty_score":0.31860125},"labels":[],"label_agreement":null},{"id":"W4413206760","doi":"10.3390/en18164245","title":"Energy Arbitrage Analysis for Market-Selection of a Battery Energy Storage System-Based Venture","year":2025,"lang":"en","type":"article","venue":"Energies","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Arbitrage; Volatility (finance); Electricity market; Electricity; Renewable energy; Economics; Profitability index; Energy market; Business; Environmental economics; Econometrics; Finance; Engineering","score_opus":0.002899429282277446,"score_gpt":0.18233526748842174,"score_spread":0.1794358382061443,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413206760","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0076952972,0.0014636338,0.9827702,0.000022118404,0.0005589621,0.0000797795,0.000022140852,0.00039480158,0.0069930833],"genre_scores_gemma":[0.99638003,0.000036432106,0.0016910715,0.00003774077,0.00006132017,0.0001608728,0.00007391745,0.00003087446,0.0015277255],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99897873,0.00006999746,0.0003656493,0.00021223539,0.0001467556,0.00022664045],"domain_scores_gemma":[0.99937284,0.00015329765,0.000091510854,0.00025110214,0.00010063774,0.000030583935],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015019676,0.00018642208,0.00038492493,0.0008419961,0.000057285022,0.000030009598,0.00014499389,0.00014207244,0.000024856095],"category_scores_gemma":[0.000017774011,0.0001977866,0.00021582613,0.0016203058,0.000014104641,0.00008436374,0.000011007869,0.000058205136,2.1970081e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031714302,0.000018205765,0.00030388337,0.00038790668,0.00074444024,0.0000012953819,0.000017736851,0.98378015,0.0028776876,0.006110358,0.005095956,0.0006306976],"study_design_scores_gemma":[0.0003205316,0.000029987756,0.00031161448,0.00009469234,0.00038428543,6.895368e-7,0.000031999887,0.9397231,0.05140541,0.000030613308,0.007495485,0.000171589],"about_ca_topic_score_codex":0.00015340898,"about_ca_topic_score_gemma":0.00016217351,"teacher_disagreement_score":0.9886848,"about_ca_system_score_codex":0.00021853602,"about_ca_system_score_gemma":0.00005973761,"threshold_uncertainty_score":0.8065504},"labels":[],"label_agreement":null},{"id":"W4413295584","doi":"10.1016/j.enpol.2025.114821","title":"Mitigation and adaptation: Assessing the multi-value benefits of transmission expansion","year":2025,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Victoria","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Adaptation (eye); Value (mathematics); Natural resource economics; Economics; Environmental science; Environmental economics; Business; Environmental resource management; Statistics; Mathematics; Psychology","score_opus":0.010232011091203655,"score_gpt":0.25018075540340035,"score_spread":0.2399487443121967,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413295584","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.060150117,0.0035239847,0.931204,0.00049903546,0.00015380807,0.000089098656,0.0000017092706,0.00012901807,0.00424923],"genre_scores_gemma":[0.9919206,0.00034751982,0.0073505477,0.00006132238,0.00004908421,0.0000114043205,0.000008746321,0.000012664984,0.00023809279],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99947035,0.000046156627,0.0002050796,0.000088723405,0.00008818989,0.00010148766],"domain_scores_gemma":[0.9997304,0.00005804785,0.000036997608,0.00011591665,0.000034974735,0.00002365265],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009582731,0.00008209959,0.00009328027,0.00016092007,0.00007190678,0.000024989713,0.000060666396,0.00006383959,0.0000017447343],"category_scores_gemma":[0.00002936015,0.00006683154,0.000021279498,0.0004488305,0.000017282267,0.00013287333,0.000008458682,0.000045397195,2.4976205e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017157473,0.000010182942,0.00009366176,0.00006083639,0.00001961825,1.4583661e-7,0.00072620646,0.7918962,0.007034476,0.03947035,0.000110111534,0.16057649],"study_design_scores_gemma":[0.00026842495,0.000008371805,0.003694478,0.00016379789,0.000013669502,0.0000020445073,0.00006810307,0.965393,0.028510166,0.00023388061,0.0015728516,0.0000712012],"about_ca_topic_score_codex":0.00022341538,"about_ca_topic_score_gemma":0.000013534283,"teacher_disagreement_score":0.9317705,"about_ca_system_score_codex":0.000044526663,"about_ca_system_score_gemma":0.000049608152,"threshold_uncertainty_score":0.27253112},"labels":[],"label_agreement":null},{"id":"W4413372123","doi":"10.33564/ijeast.2025.v10i02.006","title":"COMPARING HYDROPOWER LEADERS: ORGANIZATIONAL PRACTICES, CHALLENGES, AND OPPORTUNITIES AT BC HYDRO AND NHPC","year":2025,"lang":"en","type":"article","venue":"International Journal of Engineering Applied Sciences and Technology","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Business; Environmental planning; Environmental science; Ecology; Biology","score_opus":0.0313894289248037,"score_gpt":0.25000443764069646,"score_spread":0.21861500871589276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413372123","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8655992,0.055576734,0.05373287,0.009002996,0.0015759639,0.00020853453,0.0000031363015,0.0003489795,0.013951568],"genre_scores_gemma":[0.991784,0.0059980433,0.002113095,0.000020782225,0.000038182086,0.0000025357692,9.301318e-7,0.0000082190945,0.000034238616],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993264,0.0000046426176,0.00024583476,0.00012430015,0.00017574633,0.00012306197],"domain_scores_gemma":[0.99960256,0.00008280593,0.00013324252,0.000047021807,0.000097445874,0.000036906597],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025213006,0.000102920836,0.00016047938,0.0006663434,0.000055130346,0.000056013727,0.00018919456,0.00008330294,0.0000040661243],"category_scores_gemma":[0.00007739772,0.000099420904,0.000008684824,0.00018875024,0.00015342887,0.00017792283,0.000091354304,0.00015232584,4.1872138e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004964165,0.000083201594,0.008816133,0.0003941674,0.00097507436,0.00010345189,0.0015408415,0.118613,0.04295005,0.78613526,0.000806499,0.039532706],"study_design_scores_gemma":[0.002506587,0.00026520868,0.0028605564,0.00075344875,0.0001260243,0.0029684382,0.0030314215,0.92454934,0.015238112,0.00739522,0.039453357,0.0008522703],"about_ca_topic_score_codex":0.0000015650851,"about_ca_topic_score_gemma":0.000003577731,"teacher_disagreement_score":0.80593634,"about_ca_system_score_codex":0.00006233985,"about_ca_system_score_gemma":0.000029046789,"threshold_uncertainty_score":0.40542665},"labels":[],"label_agreement":null},{"id":"W4414485553","doi":"10.33423/jabe.v27i5.7851","title":"The Inflation Reduction Act and Its Impact on Fuel Cell Companies: A Financial and Market Analysis","year":2025,"lang":"en","type":"article","venue":"Journal of Applied Business and Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Incentive; Tax credit; Revenue; Profitability index; Carbon tax; Renewable energy; Tax revenue; Investment (military)","score_opus":0.003182877610918708,"score_gpt":0.185058308553003,"score_spread":0.1818754309420843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414485553","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9944573,0.0010674086,0.0015116594,0.0000693349,0.0001590125,0.000079906225,0.0000019951895,0.0000071473128,0.0026462274],"genre_scores_gemma":[0.99442893,0.005388454,0.00008399275,0.000008353301,0.00006332469,0.0000016323886,0.0000013841012,0.00000586021,0.000018067007],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995676,0.000005782061,0.00025479464,0.00006643294,0.000026111067,0.0000792776],"domain_scores_gemma":[0.9996823,0.00004881224,0.00014070995,0.00005138343,0.00004958499,0.000027211676],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021812906,0.00008651231,0.00019620646,0.00020629454,0.00007561711,0.0001099827,0.000035314584,0.000051641324,0.0000020581422],"category_scores_gemma":[0.000008523345,0.00006473174,0.00002596494,0.0002540587,0.000011129475,0.00013204126,0.000009955327,0.00007983714,1.7450778e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000403077,0.000016015016,0.001522644,0.00017621813,0.00035742068,4.9963666e-7,0.00027678703,0.98514557,0.00027829612,0.00071940036,0.0005220283,0.010582029],"study_design_scores_gemma":[0.0010017403,0.000046465047,0.2518314,0.0000391614,0.00036512915,0.000020213012,0.00010947156,0.743962,0.00026945322,0.0008171818,0.0013570951,0.00018068285],"about_ca_topic_score_codex":0.0000026123485,"about_ca_topic_score_gemma":0.000006463957,"teacher_disagreement_score":0.25030875,"about_ca_system_score_codex":0.00007526359,"about_ca_system_score_gemma":0.000030928153,"threshold_uncertainty_score":0.26396838},"labels":[],"label_agreement":null},{"id":"W4414793528","doi":"10.3390/en18195255","title":"Modeling the Duration of Electricity Price Spikes Using Survival Analysis","year":2025,"lang":"en","type":"article","venue":"Energies","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Duration (music); Bidding; Electricity market; Market price; Electricity price; Electricity; Spike (software development); Nonparametric statistics; Time series","score_opus":0.00933760819621247,"score_gpt":0.22460042378103998,"score_spread":0.21526281558482752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414793528","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41796246,0.00064839463,0.57974166,0.000011355628,0.00011191181,0.000039390663,5.970577e-7,0.000072799994,0.0014114319],"genre_scores_gemma":[0.9983737,0.00007399272,0.0014371861,0.000004450049,0.000021167807,0.0000043567056,0.0000044539356,0.0000072946914,0.000073402975],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99939775,0.00004227346,0.00024152997,0.00008435097,0.000118461714,0.00011562758],"domain_scores_gemma":[0.9996562,0.000060371178,0.00003458701,0.00016783891,0.000072871895,0.000008128649],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020370804,0.00007664553,0.00015621942,0.00026019185,0.000059912425,0.00002488246,0.000107367014,0.000040623177,0.0000034334823],"category_scores_gemma":[0.000049052676,0.00006223379,0.000060582057,0.00188702,0.000008079289,0.00009772005,0.000013142098,0.000054950637,3.2070707e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001964087,0.0000033919443,0.0005337075,0.00001973404,0.00016045559,1.0216441e-7,0.00009285948,0.9888763,0.008720467,0.0014498463,0.000014320926,0.00012684915],"study_design_scores_gemma":[0.00004378006,0.0000028078955,0.00024944366,0.000009020801,0.00016185587,1.9067612e-7,0.000049111204,0.9794809,0.019869681,0.000063223866,0.000015460088,0.000054517335],"about_ca_topic_score_codex":0.00024398709,"about_ca_topic_score_gemma":0.00007098882,"teacher_disagreement_score":0.58041126,"about_ca_system_score_codex":0.00006832715,"about_ca_system_score_gemma":0.000024874296,"threshold_uncertainty_score":0.25378203},"labels":[],"label_agreement":null},{"id":"W4415976682","doi":"10.2139/ssrn.5708763","title":"Powering the Federation: A Blueprint for National Electricity Integration in Canada","year":2025,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Victoria","funders":"","keywords":"Blueprint; Electricity; Government (linguistics); Electricity retailing; Electric power industry","score_opus":0.004036315846897572,"score_gpt":0.20386622375374652,"score_spread":0.19982990790684896,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415976682","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.056482058,0.0018937525,0.9360235,0.0010361284,0.000621318,0.00047658186,0.0000028420232,0.000046852514,0.003416967],"genre_scores_gemma":[0.9989272,0.00029800102,0.00015720847,0.0001061167,0.000088987494,0.000059605412,0.000006697715,0.0000146926195,0.00034151072],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99831975,0.00004709781,0.00035357938,0.00011853289,0.0002304567,0.0009305591],"domain_scores_gemma":[0.9995537,0.00012658622,0.00005732302,0.00008333678,0.00015711298,0.000021974698],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011389884,0.0001251195,0.00012819101,0.00016916114,0.00018948484,0.000082406645,0.00019568247,0.000046768582,0.0000059251397],"category_scores_gemma":[0.00014501726,0.00010527336,0.000044117023,0.00052912865,0.000005485088,0.00014549025,0.00000916096,0.0008597694,9.247788e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":true,"study_design_scores_codex":[0.00010016058,0.000046358284,0.0030232372,0.000060769242,0.00036570057,0.0000022424415,0.00026121867,0.5161077,0.0033840407,0.42136386,0.004946353,0.050338365],"study_design_scores_gemma":[0.0013988406,0.00008767749,0.0027558154,0.000106420375,0.000027185086,0.00015666854,0.0011221293,0.89122796,0.005500167,0.094596975,0.0026396026,0.000380561],"about_ca_topic_score_codex":0.023744153,"about_ca_topic_score_gemma":0.9073295,"teacher_disagreement_score":0.9424451,"about_ca_system_score_codex":0.010021825,"about_ca_system_score_gemma":0.007266775,"threshold_uncertainty_score":0.9983611},"labels":[],"label_agreement":null},{"id":"W4416136968","doi":"10.1109/pesgm52009.2025.11225719","title":"An Efficient Data-Driven Model for Generation Expansion Planning with Short-Term Operational Constraints","year":2025,"lang":"","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity generation; Capacity planning; Electricity; Computation; Unit (ring theory); Power system simulation; Key (lock); Renewable energy","score_opus":0.04305818984085352,"score_gpt":0.2972141560771376,"score_spread":0.25415596623628406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416136968","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04240522,0.00021873173,0.95353526,0.00006888573,0.00053312496,0.0016028234,0.00020276666,0.0002046678,0.0012285367],"genre_scores_gemma":[0.85351217,0.000012154848,0.14293952,0.000072450035,0.00015060662,0.00011575141,0.0028704347,0.00004802708,0.00027887983],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976694,0.000060090115,0.00067181163,0.00081807945,0.00034372744,0.00043688758],"domain_scores_gemma":[0.9985785,0.00006950196,0.00006335169,0.0008554235,0.0003091978,0.00012401781],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004008247,0.00037113807,0.0003447093,0.00029086732,0.0003546253,0.0003478636,0.00043811026,0.00021588715,0.000045670702],"category_scores_gemma":[0.000030280906,0.00035912113,0.00003766555,0.00034824494,0.000056487785,0.0006481056,0.00006780321,0.00016459422,0.0000031630418],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004701722,0.00012337345,0.00029604379,0.00011888011,0.00012934586,0.0000023899602,0.0005572541,0.976347,0.015942974,0.0031517902,0.0010507868,0.0022331353],"study_design_scores_gemma":[0.000910042,0.00014027752,0.00007327705,0.00024979195,0.00013325144,0.000009772565,0.000087844724,0.99470735,0.0032720936,0.0000043856267,0.000017254733,0.0003946502],"about_ca_topic_score_codex":0.000005373426,"about_ca_topic_score_gemma":0.000030076102,"teacher_disagreement_score":0.811107,"about_ca_system_score_codex":0.00027428014,"about_ca_system_score_gemma":0.00055998814,"threshold_uncertainty_score":0.9998861},"labels":[],"label_agreement":null},{"id":"W4416291530","doi":"10.29173/alr2874","title":"Alberta's Electricity Regime Overhaul: Implications of the Current and Evolving Regulatory Environment for Power Generation","year":2025,"lang":"","type":"article","venue":"Alberta Law Review","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"TransAlta (Canada)","funders":"","keywords":"Electricity; Electricity market; Electricity generation; Renewable energy; Investment (military); Electricity retailing; Causation; Power market; Electric power industry; Variable renewable energy","score_opus":0.009324475259230485,"score_gpt":0.2367945696111068,"score_spread":0.2274700943518763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416291530","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000766902,0.92883337,0.040860195,0.0062702415,0.0012178841,0.007055546,0.000023516308,0.00003163848,0.014940685],"genre_scores_gemma":[0.82172656,0.17235382,0.0006274218,0.0014628507,0.0001212122,0.0009371104,0.0000654753,0.00010654262,0.002599026],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9973766,0.00018310541,0.0012038844,0.00058028905,0.0002316386,0.00042447605],"domain_scores_gemma":[0.9974914,0.0005658154,0.00047952583,0.0012467097,0.00013563437,0.000080899044],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00051102485,0.00041257756,0.0007215264,0.00007911673,0.00030045753,0.000053632975,0.00038063072,0.00015202335,0.00006482721],"category_scores_gemma":[0.0003598868,0.000362293,0.00029798897,0.0006611858,0.000089826084,0.00024200151,0.00012407031,0.00025467985,0.000007794257],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017683924,0.0004151905,0.0017264418,0.023510564,0.0010001439,1.2083622e-7,0.00034112655,0.0038761466,0.0028827311,0.77304286,0.09961892,0.09356808],"study_design_scores_gemma":[0.0005360522,0.000071334514,0.003139569,0.00808822,0.0012439188,0.000007971863,0.0000010179134,0.022068882,0.0015735126,0.00042471464,0.9623124,0.00053240324],"about_ca_topic_score_codex":0.00064459204,"about_ca_topic_score_gemma":0.00079727976,"teacher_disagreement_score":0.8626935,"about_ca_system_score_codex":0.0004307384,"about_ca_system_score_gemma":0.00014461357,"threshold_uncertainty_score":0.9998829},"labels":[],"label_agreement":null},{"id":"W4416595598","doi":"10.2139/ssrn.5800803","title":"Toward Zero-Shot Generalization of Deep Reinforcement Learning for Hybrid Energy System Dispatch","year":2025,"lang":"","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Reinforcement learning; Generalization; Generalization error; Normalization (sociology); Generalizability theory; Regularization (linguistics)","score_opus":0.009244271775888675,"score_gpt":0.22189743012069857,"score_spread":0.21265315834480988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416595598","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007941878,0.017779939,0.97426414,0.000077869874,0.0033436392,0.0012691405,0.000012762477,0.00022495151,0.0022333951],"genre_scores_gemma":[0.96033686,0.032379106,0.0015488581,0.000016421309,0.0007356529,0.00027830686,0.00047963002,0.0002042729,0.0040209163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98964256,0.0005169484,0.0032295764,0.00092378876,0.0010277063,0.0046594283],"domain_scores_gemma":[0.99536556,0.00020885015,0.0022486087,0.00072929234,0.0012026,0.0002450813],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0036067392,0.0011465809,0.0017101901,0.0011571725,0.00051186926,0.00024056551,0.0011746503,0.0006920143,0.000026335596],"category_scores_gemma":[0.00023686464,0.001307847,0.0009235762,0.0008113398,0.000044663157,0.00034889797,0.00030328272,0.003809722,0.0000043328164],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017853906,0.000045223773,0.000095667405,0.0026166714,0.0020547733,0.0000035305025,0.00037900184,0.8545704,0.0003753887,0.12885776,0.000076087905,0.010746955],"study_design_scores_gemma":[0.0019545015,0.0007289639,0.0000040500627,0.0018270932,0.00091218913,0.00044035233,0.0006800226,0.98054945,0.004485527,0.006252686,0.0011567276,0.0010084318],"about_ca_topic_score_codex":0.0004260574,"about_ca_topic_score_gemma":0.00019071101,"teacher_disagreement_score":0.97271526,"about_ca_system_score_codex":0.012815216,"about_ca_system_score_gemma":0.005052513,"threshold_uncertainty_score":0.99893713},"labels":[],"label_agreement":null},{"id":"W4416595599","doi":"10.2139/ssrn.5800802","title":"Toward Zero-Shot Generalization of Deep Reinforcement Learning for Hybrid Energy System Dispatch","year":2025,"lang":"","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Reinforcement learning; Generalization; Generalization error; Normalization (sociology); Generalizability theory; Regularization (linguistics)","score_opus":0.009244271775888675,"score_gpt":0.22189743012069857,"score_spread":0.21265315834480988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416595599","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007941878,0.017779939,0.97426414,0.000077869874,0.0033436392,0.0012691405,0.000012762477,0.00022495151,0.0022333951],"genre_scores_gemma":[0.96033686,0.032379106,0.0015488581,0.000016421309,0.0007356529,0.00027830686,0.00047963002,0.0002042729,0.0040209163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98964256,0.0005169484,0.0032295764,0.00092378876,0.0010277063,0.0046594283],"domain_scores_gemma":[0.99536556,0.00020885015,0.0022486087,0.00072929234,0.0012026,0.0002450813],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0036067392,0.0011465809,0.0017101901,0.0011571725,0.00051186926,0.00024056551,0.0011746503,0.0006920143,0.000026335596],"category_scores_gemma":[0.00023686464,0.001307847,0.0009235762,0.0008113398,0.000044663157,0.00034889797,0.00030328272,0.003809722,0.0000043328164],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017853906,0.000045223773,0.000095667405,0.0026166714,0.0020547733,0.0000035305025,0.00037900184,0.8545704,0.0003753887,0.12885776,0.000076087905,0.010746955],"study_design_scores_gemma":[0.0019545015,0.0007289639,0.0000040500627,0.0018270932,0.00091218913,0.00044035233,0.0006800226,0.98054945,0.004485527,0.006252686,0.0011567276,0.0010084318],"about_ca_topic_score_codex":0.0004260574,"about_ca_topic_score_gemma":0.00019071101,"teacher_disagreement_score":0.97271526,"about_ca_system_score_codex":0.012815216,"about_ca_system_score_gemma":0.005052513,"threshold_uncertainty_score":0.99893713},"labels":[],"label_agreement":null},{"id":"W4416632168","doi":"10.1016/j.enpol.2025.114975","title":"Wholesale price prediction: The role of information and transparency","year":2025,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Social Sciences and Humanities Research Council of Canada; Canada First Research Excellence Fund","keywords":"Transparency (behavior); Competition (biology); Limiting; Electricity market; Electricity; Argument (complex analysis); Balance (ability); Point (geometry)","score_opus":0.0013995927216985267,"score_gpt":0.16749333641100128,"score_spread":0.16609374368930274,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416632168","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018512055,0.00560872,0.47315475,0.00072303147,0.00040229163,0.00021860164,0.0000362017,0.0004610355,0.5008833],"genre_scores_gemma":[0.99928254,0.00028654718,0.00010888369,0.000042872205,0.000041403237,0.000016397858,0.000008981133,0.0000037974175,0.00020856403],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996645,0.000011495111,0.00016048434,0.000032150725,0.00005522232,0.00007614728],"domain_scores_gemma":[0.99982435,0.000017119428,0.000021783882,0.00010158581,0.00002108452,0.0000140636175],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004591149,0.00004868649,0.000056216562,0.0001302517,0.000029635208,0.000012667174,0.00006214725,0.000037428872,0.0000027473454],"category_scores_gemma":[0.0000127008525,0.000040425886,0.000012143256,0.000398453,0.000012026489,0.00016568111,0.000006489975,0.000032154385,8.7076313e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010892236,0.00001888221,0.0020017966,0.00020782938,0.00012959082,1.3249034e-7,0.003408843,0.3085151,0.0027439557,0.5381199,0.0035912923,0.14125177],"study_design_scores_gemma":[0.00062078657,0.000046010777,0.013951183,0.000109305416,0.000037669015,0.000008760443,0.00022663861,0.56869006,0.026808484,0.004564432,0.38475326,0.00018341572],"about_ca_topic_score_codex":0.00017882894,"about_ca_topic_score_gemma":0.00000996844,"teacher_disagreement_score":0.9807705,"about_ca_system_score_codex":0.000029867002,"about_ca_system_score_gemma":0.00002791485,"threshold_uncertainty_score":0.16485198},"labels":[],"label_agreement":null},{"id":"W4416662195","doi":"10.2139/ssrn.5806862","title":"Toward Zero-Shot Generalization of Deep Reinforcement Learning for Hybrid Energy System Dispatch","year":2025,"lang":"","type":"preprint","venue":"SSRN Electronic Journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Reinforcement learning; Generalization; Generalization error; Normalization (sociology); Generalizability theory; Regularization (linguistics)","score_opus":0.009244271775888675,"score_gpt":0.22189743012069857,"score_spread":0.21265315834480988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416662195","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007941878,0.017779939,0.97426414,0.000077869874,0.0033436392,0.0012691405,0.000012762477,0.00022495151,0.0022333951],"genre_scores_gemma":[0.96033686,0.032379106,0.0015488581,0.000016421309,0.0007356529,0.00027830686,0.00047963002,0.0002042729,0.0040209163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98964256,0.0005169484,0.0032295764,0.00092378876,0.0010277063,0.0046594283],"domain_scores_gemma":[0.99536556,0.00020885015,0.0022486087,0.00072929234,0.0012026,0.0002450813],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0036067392,0.0011465809,0.0017101901,0.0011571725,0.00051186926,0.00024056551,0.0011746503,0.0006920143,0.000026335596],"category_scores_gemma":[0.00023686464,0.001307847,0.0009235762,0.0008113398,0.000044663157,0.00034889797,0.00030328272,0.003809722,0.0000043328164],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017853906,0.000045223773,0.000095667405,0.0026166714,0.0020547733,0.0000035305025,0.00037900184,0.8545704,0.0003753887,0.12885776,0.000076087905,0.010746955],"study_design_scores_gemma":[0.0019545015,0.0007289639,0.0000040500627,0.0018270932,0.00091218913,0.00044035233,0.0006800226,0.98054945,0.004485527,0.006252686,0.0011567276,0.0010084318],"about_ca_topic_score_codex":0.0004260574,"about_ca_topic_score_gemma":0.00019071101,"teacher_disagreement_score":0.97271526,"about_ca_system_score_codex":0.012815216,"about_ca_system_score_gemma":0.005052513,"threshold_uncertainty_score":0.99893713},"labels":[],"label_agreement":null},{"id":"W4417250209","doi":"10.1109/icpre67300.2025.11274215","title":"A Survey on Optimization, Pricing, and Market Design for Power &amp; Energy Systems under Carbon Pricing Coupling","year":2025,"lang":"","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"State Grid Shanghai Municipal Electric Power Company","keywords":"Electricity; Electricity market; Futures contract; Offset (computer science); Market clearing; Spot contract; Benchmark (surveying); Carbon price; Carbon market; Electricity generation","score_opus":0.01656011142135337,"score_gpt":0.23073883948451254,"score_spread":0.21417872806315918,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417250209","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00075867766,0.005494524,0.97702825,0.00005988198,0.0024029275,0.0020412928,0.00001778245,0.00038082813,0.0118158115],"genre_scores_gemma":[0.965987,0.0008921673,0.017325262,0.00012328745,0.000088907786,0.00022739802,0.00007642271,0.0002139704,0.015065547],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99602413,0.0003797916,0.0013170502,0.00096645753,0.00040291515,0.00090967264],"domain_scores_gemma":[0.99583143,0.0023534084,0.000312324,0.00068398606,0.0006344374,0.00018440121],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0026820048,0.0007381201,0.00090502825,0.00092341343,0.00032124142,0.000494025,0.00027881187,0.0005507907,0.0000454684],"category_scores_gemma":[0.0006322592,0.0007962994,0.00009194938,0.0017174267,0.0000387074,0.00020410257,0.000079334546,0.00024715893,0.0000014588506],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016901626,0.00006457001,0.0010720638,0.0005169434,0.0004433922,9.8607e-7,0.00012988062,0.99029905,0.00006039483,0.0019076361,0.005271721,0.00006434786],"study_design_scores_gemma":[0.0012806576,0.00017484179,0.00087953766,0.001062362,0.00016045263,0.000004741512,0.000060885137,0.99507964,0.00019867558,0.000025694611,0.00036048747,0.00071203907],"about_ca_topic_score_codex":0.0015726794,"about_ca_topic_score_gemma":0.00015206402,"teacher_disagreement_score":0.9652284,"about_ca_system_score_codex":0.000995953,"about_ca_system_score_gemma":0.00030515314,"threshold_uncertainty_score":0.9994488},"labels":[],"label_agreement":null},{"id":"W46909155","doi":"","title":"OPTIMAL ECONOMIC AND ENVIRONMENTAL OPERATION OF ELECTRIC POWER SYSTEMS VIA MODERN META-HEURISTIC OPTIMIZATION ALGORITHMS","year":2012,"lang":"en","type":"article","venue":"Library and Archives Canada (Government of Canada)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Meta heuristic; Heuristic; Computer science; Power (physics); Mathematical optimization; Algorithm; Mathematics; Artificial intelligence","score_opus":0.002471509256770391,"score_gpt":0.12253603490391703,"score_spread":0.12006452564714663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W46909155","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20757581,0.019130064,0.73914975,0.00016724477,0.0010467106,0.0010595069,0.0005243029,0.000073554256,0.03127304],"genre_scores_gemma":[0.99647963,0.00029990397,0.0028878972,0.000020091493,0.000023250577,0.000013645477,0.000021881162,0.000027645756,0.00022604175],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998845,0.000044127868,0.0003149598,0.00013218063,0.00044007454,0.00022365188],"domain_scores_gemma":[0.9995698,0.00007153558,0.00010148593,0.00011428291,2.6563177e-7,0.00014263771],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00001828252,0.0001635662,0.00027150247,0.000037086487,0.000055357614,0.000016090456,0.00007591106,0.000030100593,0.000022483233],"category_scores_gemma":[8.304923e-7,0.0001655873,0.000019910049,0.000036829537,0.000019046334,0.00051986496,0.000029865518,0.00006233335,3.2570555e-9],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026651674,0.000012055388,0.0013470325,0.00008762709,0.0002516285,0.0000016658587,0.00007384437,0.98681617,0.009757634,0.0011876691,0.000058075664,0.00037997362],"study_design_scores_gemma":[0.000166504,0.000036728776,0.00096936774,0.000010358896,0.00009846092,0.000014400748,0.00012632777,0.97657156,0.021696009,0.000006827725,0.0001454645,0.00015801503],"about_ca_topic_score_codex":0.00037459293,"about_ca_topic_score_gemma":0.000095708776,"teacher_disagreement_score":0.78890383,"about_ca_system_score_codex":0.000025147598,"about_ca_system_score_gemma":0.00012629908,"threshold_uncertainty_score":0.6752454},"labels":[],"label_agreement":null},{"id":"W560966115","doi":"10.1016/j.epsr.2015.05.011","title":"Sensitivity-based chance-constrained Generation Expansion Planning","year":2015,"lang":"en","type":"article","venue":"Electric Power Systems Research","topic":"Electric Power System Optimization","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis; University of Calgary","funders":"","keywords":"Sensitivity (control systems); Mathematical optimization; Joint (building); Exploit; Reliability (semiconductor); Computer science; Iterative method; Algorithm; Mathematics; Engineering","score_opus":0.08589703047869257,"score_gpt":0.3191983758273748,"score_spread":0.23330134534868224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W560966115","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19582832,0.008127875,0.7717489,0.000114882525,0.0027736118,0.001790529,0.0000096755175,0.0013201933,0.018285997],"genre_scores_gemma":[0.99853873,0.000016819313,0.0003268867,0.00001582823,0.00035395168,0.00017750658,0.00005025451,0.00009225731,0.00042776245],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99555045,0.00096832454,0.00050738343,0.00045797857,0.0014389829,0.0010768767],"domain_scores_gemma":[0.99802065,0.00029440055,0.000067803056,0.0005200395,0.0007434881,0.0003536057],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0045919255,0.00028333953,0.00037996925,0.0010977634,0.00020792734,0.00024386172,0.0002133973,0.0002655333,0.000010838249],"category_scores_gemma":[0.00044127618,0.00029245627,0.000058445417,0.0022473,0.000036311816,0.00031001965,0.000028690325,0.0006403617,0.00021198223],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054319713,0.00008369834,0.00041712364,0.00016755392,0.00008397088,0.00022212423,0.0011245866,0.7788433,0.16412571,0.00043672288,0.053124737,0.0013161474],"study_design_scores_gemma":[0.00070220337,0.00025705076,0.000057015353,0.00011125146,0.000005786711,0.00009044394,0.00012986327,0.9755418,0.019076742,0.000008197204,0.0036958267,0.0003238223],"about_ca_topic_score_codex":0.00011990816,"about_ca_topic_score_gemma":0.000007751871,"teacher_disagreement_score":0.8027104,"about_ca_system_score_codex":0.0009408876,"about_ca_system_score_gemma":0.00049353915,"threshold_uncertainty_score":0.99995273},"labels":[],"label_agreement":null},{"id":"W590842113","doi":"10.1016/j.procs.2015.05.143","title":"Overload Management in Transmission System Using Particle Swarm Optimization","year":2015,"lang":"en","type":"article","venue":"Procedia Computer Science","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Particle swarm optimization; Mathematical optimization; Transmission (telecommunications); Algorithm; Telecommunications; Mathematics","score_opus":0.016348471620368184,"score_gpt":0.21996243611533692,"score_spread":0.20361396449496874,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W590842113","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046299316,0.00016473759,0.95158094,0.0000112763055,0.000519613,0.0002736152,1.8826543e-7,0.00030184054,0.0008485005],"genre_scores_gemma":[0.7934002,0.000008277235,0.20651758,0.000010056598,0.00003634543,0.000011348654,6.3834113e-7,0.000011043644,0.0000044913663],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988335,0.000015666034,0.00022872996,0.0002473247,0.00037149296,0.00030328825],"domain_scores_gemma":[0.99959046,0.000007669159,0.000029570958,0.00015191184,0.00008150546,0.0001389142],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047877032,0.00010489498,0.0001061716,0.00019208637,0.00005092583,0.000100542435,0.00025109117,0.000030169998,7.367796e-7],"category_scores_gemma":[0.0000050012222,0.00010611083,0.000012659869,0.0014733004,0.000027584925,0.00057427684,0.000042125423,0.00005351296,0.000007828129],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000023890057,0.000011243922,0.00020624873,0.00008515177,0.000002148834,0.000005805937,0.0005127897,0.99349177,0.00019416545,0.00021136463,0.000022394537,0.005254507],"study_design_scores_gemma":[0.00032672164,0.000018779823,0.00009766677,0.000100282596,0.0000043660416,0.000017589316,0.00003261252,0.9966233,0.0026135142,0.000009079455,0.000031333715,0.00012479427],"about_ca_topic_score_codex":0.0000068865784,"about_ca_topic_score_gemma":5.785338e-7,"teacher_disagreement_score":0.7471009,"about_ca_system_score_codex":0.00044564158,"about_ca_system_score_gemma":0.00006284247,"threshold_uncertainty_score":0.43270737},"labels":[],"label_agreement":null},{"id":"W609929272","doi":"10.1016/j.enpol.2015.05.024","title":"Measuring the competitiveness benefits of a transmission investment policy: The case of the Alberta electricity market","year":2015,"lang":"en","type":"article","venue":"Energy Policy","topic":"Electric Power System Optimization","field":"Engineering","cited_by":65,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity market; Market power; Electricity; Investment (military); Competition (biology); Economics; Market clearing; Electricity retailing; Industrial organization; Clearing; Transmission (telecommunications); Business; Microeconomics; Finance; Telecommunications; Monopoly","score_opus":0.014706902174986847,"score_gpt":0.2102365265970255,"score_spread":0.19552962442203864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W609929272","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6371061,0.009683273,0.029718835,0.009256943,0.0008383818,0.0015717976,0.00006925713,0.0003013423,0.31145403],"genre_scores_gemma":[0.99882126,0.00010461017,0.000048849746,0.00019391651,0.00015229915,0.000028849337,0.0000016353257,0.000031049618,0.0006175318],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99878013,0.00029043137,0.00031339432,0.0001173833,0.00023530722,0.00026333088],"domain_scores_gemma":[0.99902624,0.00021765345,0.00011380977,0.00046260632,0.00010023486,0.00007945312],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003897439,0.00016395429,0.000198925,0.00014134677,0.00009892876,0.000014289879,0.00039038504,0.000070278,0.0000070179126],"category_scores_gemma":[0.00018261529,0.00008728984,0.00008800281,0.0011880711,0.00006453379,0.00006036712,0.00004973725,0.000112557136,6.1062985e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044552304,0.00008046344,0.0002503439,0.000113392576,0.00020945068,0.0000055884725,0.0050231647,0.7311124,0.0018402174,0.24614434,0.001054406,0.014121688],"study_design_scores_gemma":[0.0029841799,0.0002872654,0.009728591,0.00069708127,0.00025652113,0.0014741248,0.0005385871,0.5907814,0.3280819,0.004332368,0.059846386,0.0009916164],"about_ca_topic_score_codex":0.032614414,"about_ca_topic_score_gemma":0.0019334642,"teacher_disagreement_score":0.3617151,"about_ca_system_score_codex":0.00021533205,"about_ca_system_score_gemma":0.000259723,"threshold_uncertainty_score":0.9738275},"labels":[],"label_agreement":null},{"id":"W63506963","doi":"","title":"Generation Capacity Expansion Planning in Deregulated Electricity Markets","year":2009,"lang":"en","type":"article","venue":"UWSpace (University of Waterloo)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Waterloo; Mitacs","keywords":"Electricity; Business; Electricity market; Electricity generation; Electricity retailing; Natural resource economics; Industrial organization; Economics; Engineering; Electrical engineering; Power (physics)","score_opus":0.012700343861463508,"score_gpt":0.17739012832534495,"score_spread":0.16468978446388144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W63506963","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9902165,0.00010779002,0.0088713635,0.00011679915,0.0000734305,0.00015189653,0.0000016276454,0.00016388786,0.0002967152],"genre_scores_gemma":[0.9959205,0.00003230796,0.0024275577,0.000008319956,0.000016079888,1.1567461e-7,0.000019165116,0.000009097131,0.0015668863],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993134,0.00005521642,0.00010837391,0.00015759178,0.00013939141,0.00022598787],"domain_scores_gemma":[0.9997029,0.000012529393,0.0000452697,0.00014548772,0.000046418234,0.000047431688],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014439723,0.00011501519,0.00017820188,0.00029342878,0.000061339226,0.000010168928,0.00011692031,0.00012400073,0.000021588125],"category_scores_gemma":[0.000008457596,0.00014763008,0.00003495045,0.00046608967,0.000013137289,0.00028888002,0.000009480398,0.000120246215,0.0000062233044],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010030381,0.000117870164,0.005570016,0.00009521224,0.0000523166,0.00006891737,0.04378448,0.46793535,0.46987998,0.000134035,0.0033030354,0.008958476],"study_design_scores_gemma":[0.0009216615,0.00010439072,0.062981315,0.00009089381,0.000020119764,0.000009408828,0.0012217899,0.8978549,0.03640175,0.000055501652,0.00004090212,0.00029736632],"about_ca_topic_score_codex":0.0013923626,"about_ca_topic_score_gemma":0.0011394541,"teacher_disagreement_score":0.43347824,"about_ca_system_score_codex":0.00017161825,"about_ca_system_score_gemma":0.000013058362,"threshold_uncertainty_score":0.602018},"labels":[],"label_agreement":null},{"id":"W643821914","doi":"","title":"Modelling prices in competitive electricity markets","year":2004,"lang":"en","type":"book","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":219,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity market; Bidding; Economics; Spot contract; Autoregressive integrated moving average; Market clearing; Electricity; Economy; Financial economics; Futures contract; Microeconomics; Computer science; Time series; Engineering","score_opus":0.006381468224098542,"score_gpt":0.17700137562182236,"score_spread":0.1706199073977238,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W643821914","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000010834507,0.0011505242,0.39880902,0.0000031364598,0.00013019954,0.00027559372,0.0000034756083,0.00030351352,0.59931374],"genre_scores_gemma":[0.03397943,0.0022386643,0.02019196,0.00005687727,0.000330892,0.00008710049,0.0002866005,0.0003848202,0.94244367],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998731,0.000014057967,0.00039820743,0.0002743901,0.00023532577,0.0003469827],"domain_scores_gemma":[0.99954474,0.000087074615,0.00006755921,0.0001961858,0.000053013187,0.00005140293],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015990865,0.0003207288,0.0004082473,0.00045904407,0.000019717383,0.000035357,0.00018979915,0.00037655886,0.000105887935],"category_scores_gemma":[0.0000071254294,0.0003542831,0.00006384694,0.00028177397,0.000010831679,0.00011879677,0.000017119137,0.0004849286,0.00005685758],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003838488,0.000008977176,0.0000022743263,0.00018744972,0.000036845464,0.000015020537,0.000082763094,0.98530626,0.0000021721535,0.012715849,0.0014744351,0.00016412447],"study_design_scores_gemma":[0.00027999215,0.000018155995,0.000005074419,0.0004191244,0.000017884548,0.000008692441,0.000002801187,0.97802216,0.00010147263,0.0019317528,0.018723212,0.00046970803],"about_ca_topic_score_codex":0.000028625625,"about_ca_topic_score_gemma":0.000053005868,"teacher_disagreement_score":0.37861705,"about_ca_system_score_codex":0.0025948694,"about_ca_system_score_gemma":0.00040674824,"threshold_uncertainty_score":0.9998909},"labels":[],"label_agreement":null},{"id":"W6889004197","doi":"10.25318/2710001301-eng","title":"Federal extramural expenditures on science and technology, type of science, performing sector, type of payment and geography","year":2019,"lang":"en","type":"dataset","venue":"Statistics Canada Dissemination","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Payment; Type (biology); Government (linguistics)","score_opus":0.006669629416961716,"score_gpt":0.24780611169025843,"score_spread":0.2411364822732967,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6889004197","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039787006,0.0010947388,0.00055300904,0.000013479055,0.0019844451,0.00060522225,0.9557905,0.000030061901,0.00014150792],"genre_scores_gemma":[0.7594678,0.00030441256,0.001039483,0.0000051507436,0.000017794686,0.0000074536088,0.23911929,0.00001950309,0.000019110059],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986498,0.0000071248514,0.00024444802,0.00022455715,0.0006646175,0.00020948346],"domain_scores_gemma":[0.9990865,0.00007627323,0.00015048993,0.0002062374,0.0004243444,0.000056183424],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024216263,0.00015349679,0.00020675236,0.00079310103,0.00012124865,0.0000381694,0.00019996584,0.000085391264,0.000010706348],"category_scores_gemma":[0.0002476371,0.00015359724,0.0000043338882,0.0009099465,0.0004138724,0.00009483235,0.000040818108,0.00013756347,1.7550134e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000889275,0.000012877638,0.0004861478,0.00062231714,0.000020704869,0.0000030804129,0.00004120844,0.00047125423,0.0031535018,0.00040168004,0.9926465,0.0021317962],"study_design_scores_gemma":[0.004004458,0.007812898,0.21843028,0.010132628,0.001206494,0.00030418916,0.005110928,0.2903863,0.20916364,0.0011651121,0.24352884,0.008754221],"about_ca_topic_score_codex":0.0036770203,"about_ca_topic_score_gemma":0.008199001,"teacher_disagreement_score":0.7491177,"about_ca_system_score_codex":0.0002471447,"about_ca_system_score_gemma":0.0005617765,"threshold_uncertainty_score":0.62635136},"labels":[],"label_agreement":null},{"id":"W6901821583","doi":"10.60692/yqspp-ncr74","title":"Hydropower Scheduling in Large Scale Power Systems","year":2012,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Hydroelectricity; Electric power system; Renewable energy; Hydro power; Scheduling (production processes); Scale (ratio); Electric power","score_opus":0.010077095994036498,"score_gpt":0.18465861005268777,"score_spread":0.17458151405865127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6901821583","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.59478587,0.000107633095,0.37836328,0.0000036769811,0.0025294027,0.0005629545,0.00003485692,0.00083062024,0.022781665],"genre_scores_gemma":[0.9993388,3.0011472e-7,0.00035792086,0.000018955452,0.000071887145,0.00009208842,0.000019503657,0.000033898286,0.00006665031],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980546,0.000062891064,0.0008218648,0.00010378104,0.0003216612,0.0006352077],"domain_scores_gemma":[0.99928063,0.000006618158,0.00013930863,0.00034888877,0.000082061175,0.00014251728],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0007414174,0.00023473261,0.00029955353,0.00052199676,0.00006434111,0.00015157412,0.00015362869,0.00019232875,0.000023038998],"category_scores_gemma":[0.000011872298,0.0002243041,0.000054516604,0.00056006806,0.000007660591,0.001780417,0.000029589391,0.0001612383,0.0015679868],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018397363,0.000007848918,0.54274786,0.0012174867,0.00006561039,0.0000028124505,0.13260151,0.3224766,0.000009241423,0.00053872255,0.00028271627,0.000031190233],"study_design_scores_gemma":[0.0014962388,0.000021681471,0.026893089,0.0005249663,0.00002033682,0.00011378469,0.020609258,0.947879,0.00035811766,1.327276e-7,0.0014536295,0.00062976696],"about_ca_topic_score_codex":0.0000046394393,"about_ca_topic_score_gemma":2.3216501e-7,"teacher_disagreement_score":0.6254024,"about_ca_system_score_codex":0.00041959842,"about_ca_system_score_gemma":0.000014059043,"threshold_uncertainty_score":0.9992094},"labels":[],"label_agreement":null},{"id":"W6920701519","doi":"10.60692/y9246-ddb81","title":"An Adjustable Robust Economic Energy and Reserve Dispatch Problem Incorporating Large-Scale Wind Farms","year":2022,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Vine copula; Wind power; Economic dispatch; Copula (linguistics); Electric power system; Scheduling (production processes)","score_opus":0.010277286494499108,"score_gpt":0.16751840245251157,"score_spread":0.15724111595801246,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6920701519","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63916504,0.00003890917,0.35050172,0.00001730817,0.0006865391,0.00063766766,0.00037928871,0.001017076,0.0075564627],"genre_scores_gemma":[0.9980233,3.753143e-7,0.0014043414,0.00002337531,0.000060500788,0.00016177034,0.00017428293,0.000034694942,0.000117381984],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99850017,0.000101539204,0.0006681335,0.00017903045,0.00022223286,0.00032889034],"domain_scores_gemma":[0.99925435,0.000005719144,0.00023417182,0.00034574026,0.00004962977,0.000110371446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005398798,0.00020295213,0.0002469597,0.0002883236,0.00032145812,0.00023700821,0.00019901966,0.00007868477,0.000031368938],"category_scores_gemma":[0.000002036534,0.00021362696,0.000033123706,0.0002726213,0.000009078407,0.0014146387,0.000097141274,0.000121481484,0.00003150497],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013860209,0.000001818902,0.05184325,0.00029498333,0.000026613425,0.0000014672136,0.022481592,0.92473626,0.000003725403,0.00023659246,0.00023700247,0.00012281335],"study_design_scores_gemma":[0.0007126021,0.00006694366,0.0014255263,0.00004055891,0.000015052873,0.000059644928,0.014200732,0.98244786,0.00012390142,0.0000023000237,0.00061969867,0.00028518733],"about_ca_topic_score_codex":0.000047121288,"about_ca_topic_score_gemma":0.00001580033,"teacher_disagreement_score":0.35885826,"about_ca_system_score_codex":0.00048744454,"about_ca_system_score_gemma":0.000038288235,"threshold_uncertainty_score":0.8711455},"labels":[],"label_agreement":null},{"id":"W6927084908","doi":"10.25620/e211215","title":"Discriminating Data","year":2021,"lang":"en","type":"other","venue":"ICI Berlin","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Vision; Politics; Identity politics; Order (exchange); Identity (music); Big data; Data collection","score_opus":0.029611821726079065,"score_gpt":0.2550149071024583,"score_spread":0.2254030853763792,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6927084908","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000012783028,0.010013282,0.05123526,0.000013074368,0.0010458039,0.0001329763,0.00006985692,0.00062771025,0.93686074],"genre_scores_gemma":[0.0022454504,0.0006069895,0.016577214,0.000031225765,0.0011117891,0.000021393738,0.0038485273,0.001418542,0.97413886],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99924725,0.000021865575,0.00016430311,0.00024804208,0.00013856906,0.00017994232],"domain_scores_gemma":[0.9990397,0.000022344191,0.000047557438,0.0008460743,0.000010066564,0.000034259225],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00007722248,0.0001710106,0.0002171156,0.00011144507,0.000011939208,0.000035040823,0.00037060413,0.00018933586,0.0018879683],"category_scores_gemma":[0.00003721199,0.00018555195,0.000021793561,0.00017461264,0.0000065617455,0.000032718595,0.00008990414,0.00015916291,0.00008329349],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[1.5073917e-7,0.0000074535747,0.000009774861,0.0003693758,0.00007578507,0.00002124423,0.000044305245,0.0010139551,0.00005824318,0.00009313003,0.9873975,0.010909093],"study_design_scores_gemma":[0.00010968615,0.0000042342144,0.000007417753,0.0006457795,0.00004379025,0.000010128461,0.000016626325,0.09900458,0.00008453931,0.000005252372,0.89974207,0.0003258781],"about_ca_topic_score_codex":0.000080859936,"about_ca_topic_score_gemma":0.00025868978,"teacher_disagreement_score":0.097990625,"about_ca_system_score_codex":0.00004154119,"about_ca_system_score_gemma":0.000021590158,"threshold_uncertainty_score":0.99902445},"labels":[],"label_agreement":null},{"id":"W6930985334","doi":"10.5281/zenodo.3957204","title":"healpy/healpy: 1.14.0","year":2020,"lang":"en","type":"other","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Perimeter Institute","funders":"","keywords":"Pixel; Smoothing; Datapath; Convolution (computer science); Line (geometry)","score_opus":0.017773233302868757,"score_gpt":0.2062655837483082,"score_spread":0.18849235044543944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6930985334","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000032454657,0.00088442356,0.031404853,0.00024179422,0.0004120833,0.00064703333,0.00030305685,0.008034808,0.9580687],"genre_scores_gemma":[0.034800306,0.005956738,0.006267931,0.001014789,0.005284144,8.083201e-7,0.028444145,0.1845782,0.73365295],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99814963,0.0002005018,0.00031277086,0.00045727802,0.0004156068,0.00046419923],"domain_scores_gemma":[0.99894524,0.000012274313,0.00010974686,0.00054510054,0.00012642707,0.00026121066],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00023786981,0.00030676444,0.00032257295,0.0004197197,0.0004602765,0.00045788978,0.0009766317,0.0002446478,0.03665037],"category_scores_gemma":[0.00019112695,0.00036121652,0.0000688637,0.0007409006,0.000055191904,0.00010052591,0.00038205023,0.00047544506,0.028215846],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000063834577,0.000018913608,1.4882379e-7,0.00031851808,0.00008473749,0.0000137488405,0.00020506895,0.0004186373,0.00018837534,0.0005142209,0.9792853,0.01894595],"study_design_scores_gemma":[0.00030004777,0.00009044254,0.00000459065,0.000117386306,0.000021166186,0.00005323459,0.00002164442,0.003739032,0.00006470239,0.000013420033,0.9952443,0.00033000164],"about_ca_topic_score_codex":0.000018652323,"about_ca_topic_score_gemma":6.752453e-7,"teacher_disagreement_score":0.22441575,"about_ca_system_score_codex":0.00023984174,"about_ca_system_score_gemma":0.0000042727243,"threshold_uncertainty_score":0.999884},"labels":[],"label_agreement":null},{"id":"W6937178343","doi":"10.59254/sbpo-2022-157344","title":"Virtual Transactions in Electricity Markets: An Instrument for a Reliable Energy Transition Towards a Low-Carbon Operation","year":2022,"lang":"en","type":"article","venue":"Anais do Simpósio Brasileiro de Pesquisa Operacional","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Invenia (Canada)","funders":"","keywords":"Electricity; Energy (signal processing); Reliability (semiconductor); Energy transition; Electric energy; Electricity system; Mains electricity; Database transaction; Efficient energy use","score_opus":0.00792740898219144,"score_gpt":0.21671767991391735,"score_spread":0.20879027093172592,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6937178343","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68212765,0.00025629267,0.31545636,0.00021941258,0.00039378993,0.00066866394,0.00014347144,0.0002704521,0.00046391936],"genre_scores_gemma":[0.99583197,0.00011851539,0.0015758221,0.00037337048,0.0001223748,0.0013161856,0.00047242097,0.000089564186,0.00009978586],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99757034,0.00022262489,0.00059828,0.00049846165,0.0005063605,0.0006039557],"domain_scores_gemma":[0.9993427,0.00007280992,0.00005728677,0.000278089,0.00008553583,0.00016358598],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00065577275,0.00032431463,0.00033604284,0.00053727045,0.0003617721,0.000109302775,0.0002819434,0.00016299277,0.00061296974],"category_scores_gemma":[0.000021186355,0.00039523226,0.00012493307,0.0008646393,0.000021461188,0.0005729711,0.000016064243,0.00037429488,0.0000017474326],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032290196,0.0003811173,0.0002505276,0.000043298685,0.000055421766,0.00001047443,0.0013312936,0.97376055,0.00918273,0.00068446685,0.00029376493,0.013683431],"study_design_scores_gemma":[0.0016514478,0.0005560376,0.0020057883,0.000027864682,0.000032637505,0.0000663004,0.00026515336,0.9879941,0.005209181,0.00008546477,0.0016321896,0.00047388484],"about_ca_topic_score_codex":0.0005744894,"about_ca_topic_score_gemma":0.00032754475,"teacher_disagreement_score":0.31388053,"about_ca_system_score_codex":0.0014111461,"about_ca_system_score_gemma":0.00032336317,"threshold_uncertainty_score":0.99985},"labels":[],"label_agreement":null},{"id":"W6946142358","doi":"10.26108/mtyr-be70","title":"A Comparison of Electricity Industry Deregulation in Alberta and Texas","year":2004,"lang":"en","type":"article","venue":"AcadiaU-DEV","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Deregulation; Electricity market; Electric power industry; CLARITY; Electricity; Legislation; Government (linguistics); Order (exchange)","score_opus":0.01072628645656234,"score_gpt":0.2510214454872543,"score_spread":0.24029515903069196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6946142358","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98869634,0.00066176284,0.0076773423,0.00008200706,0.00005916657,0.00020057001,8.216448e-7,0.0000568394,0.0025651746],"genre_scores_gemma":[0.99932927,0.000022397411,0.00054226647,0.00001305183,0.000021032693,0.000006249959,0.00000675055,0.000018420209,0.000040555795],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9992916,0.000019395986,0.00028322174,0.00011984247,0.000102395665,0.00018356503],"domain_scores_gemma":[0.9997159,0.00005731735,0.000051206087,0.00011001596,0.000019834317,0.000045685283],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009103237,0.0001013646,0.00019573444,0.00018151541,0.000014863035,0.000010068464,0.00007100299,0.00026991186,0.0000075037046],"category_scores_gemma":[0.0000529731,0.00011464319,0.000014640095,0.00052907405,0.000013358759,0.00013789925,0.000010081569,0.0002777508,0.000006665605],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011166013,0.000078337755,0.53340876,0.0001345955,0.0000376472,0.0000019408235,0.0015683507,0.4525652,0.0025326116,0.0030659605,0.000372025,0.0062234127],"study_design_scores_gemma":[0.0019604573,0.000112197435,0.70408726,0.00022837393,0.00003333604,0.000019631874,0.000049456557,0.22399983,0.06743065,0.0012028179,0.00040486202,0.000471125],"about_ca_topic_score_codex":0.00061840867,"about_ca_topic_score_gemma":0.00047413373,"teacher_disagreement_score":0.22856537,"about_ca_system_score_codex":0.00012902962,"about_ca_system_score_gemma":0.000028131299,"threshold_uncertainty_score":0.46750137},"labels":[],"label_agreement":null},{"id":"W6958169949","doi":"10.60692/rbk8q-4br13","title":"Hydropower Scheduling in Large Scale Power Systems","year":2012,"lang":"en","type":"article","venue":"Greater South Information System","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Hydroelectricity; Electric power system; Renewable energy; Hydro power; Scheduling (production processes); Scale (ratio); Electric power","score_opus":0.010077095994036498,"score_gpt":0.18465861005268777,"score_spread":0.17458151405865127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6958169949","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.59478587,0.000107633095,0.37836328,0.0000036769811,0.0025294027,0.0005629545,0.00003485692,0.00083062024,0.022781665],"genre_scores_gemma":[0.9993388,3.0011472e-7,0.00035792086,0.000018955452,0.000071887145,0.00009208842,0.000019503657,0.000033898286,0.00006665031],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980546,0.000062891064,0.0008218648,0.00010378104,0.0003216612,0.0006352077],"domain_scores_gemma":[0.99928063,0.000006618158,0.00013930863,0.00034888877,0.000082061175,0.00014251728],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0007414174,0.00023473261,0.00029955353,0.00052199676,0.00006434111,0.00015157412,0.00015362869,0.00019232875,0.000023038998],"category_scores_gemma":[0.000011872298,0.0002243041,0.000054516604,0.00056006806,0.000007660591,0.001780417,0.000029589391,0.0001612383,0.0015679868],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018397363,0.000007848918,0.54274786,0.0012174867,0.00006561039,0.0000028124505,0.13260151,0.3224766,0.000009241423,0.00053872255,0.00028271627,0.000031190233],"study_design_scores_gemma":[0.0014962388,0.000021681471,0.026893089,0.0005249663,0.00002033682,0.00011378469,0.020609258,0.947879,0.00035811766,1.327276e-7,0.0014536295,0.00062976696],"about_ca_topic_score_codex":0.0000046394393,"about_ca_topic_score_gemma":2.3216501e-7,"teacher_disagreement_score":0.6254024,"about_ca_system_score_codex":0.00041959842,"about_ca_system_score_gemma":0.000014059043,"threshold_uncertainty_score":0.9992094},"labels":[],"label_agreement":null},{"id":"W6958557702","doi":"10.6084/m9.figshare.26531105.v1","title":"Additional file 2 of The landscape of Medicare policies for gender-affirming surgeries in Canada: an environmental scan","year":2024,"lang":"en","type":"article","venue":"Figshare","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Wilfrid Laurier University; Toronto Western Hospital; University of Toronto; Toronto General Hospital; University of Saskatchewan; Women's College Hospital","funders":"","keywords":"Government (linguistics); Key (lock); Payment; Work (physics)","score_opus":0.011268470083890782,"score_gpt":0.1805937670117433,"score_spread":0.1693252969278525,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6958557702","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00037349216,0.00028341115,0.000004479067,0.000005557683,0.00005055064,0.0000974976,0.99866635,0.000019171344,0.00049950246],"genre_scores_gemma":[0.54588175,8.6584305e-7,0.00003083666,0.000004243128,0.000023740058,0.00020027808,0.45381323,0.000011620761,0.00003348394],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99956644,0.000009462356,0.00013395511,0.00006283833,0.0001297722,0.00009754574],"domain_scores_gemma":[0.9994876,0.0003818079,0.000024750154,0.000077627556,0.00000841052,0.000019807962],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000011805832,0.000056501856,0.0000843719,0.00004492348,0.000014033219,0.0000048727575,0.0000843463,0.000027286833,0.7040739],"category_scores_gemma":[0.00014273894,0.0000487096,0.0000265927,0.00012381808,0.0000039400884,0.000057384546,0.000015053357,0.00004157434,0.0000038936055],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.3941096e-7,0.000001873786,0.000017619705,0.00022504492,0.000009704837,7.54776e-7,0.00015576147,0.004858352,0.000010436917,0.0000014660693,0.9940875,0.000630914],"study_design_scores_gemma":[0.00012315814,0.000028162134,0.015822615,0.004134399,0.000009401576,0.000014683171,0.0013853319,0.24700506,0.0022196448,0.000009462295,0.72899985,0.00024821635],"about_ca_topic_score_codex":0.0032966945,"about_ca_topic_score_gemma":0.09323029,"teacher_disagreement_score":0.70407003,"about_ca_system_score_codex":0.0001693833,"about_ca_system_score_gemma":0.00029940455,"threshold_uncertainty_score":0.9233159},"labels":[],"label_agreement":null},{"id":"W6959185636","doi":"10.6084/m9.figshare.c.7507908","title":"Controlled human exposures: a review and comparison of the health effects of diesel exhaust and wood smoke","year":2024,"lang":"en","type":"other","venue":"Figshare","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Particulates; Air pollution; Diesel exhaust; Smoke; Human health; Diesel fuel; Air pollutants","score_opus":0.019360470621989787,"score_gpt":0.28236309748899835,"score_spread":0.26300262686700854,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6959185636","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000007573654,0.9512246,0.000005453138,0.000024098064,0.00011009082,0.002286989,0.013728768,0.0001421271,0.032470305],"genre_scores_gemma":[0.5547591,0.06991326,0.0004117058,0.0008260023,0.0010154083,0.0065819616,0.04828453,0.00543292,0.31277514],"study_design_codex":"not_applicable","study_design_gemma":"systematic_review","domain_scores_codex":[0.999216,0.00006199283,0.0003378225,0.00014197346,0.00012444703,0.00011773758],"domain_scores_gemma":[0.9993889,0.000076372344,0.00024070163,0.00023640147,0.000022886448,0.000034741097],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00005563422,0.0001833068,0.00088860875,0.00008805937,0.000015001505,0.000011354553,0.00010766233,0.000118396834,0.0021670419],"category_scores_gemma":[0.00017183357,0.00013170816,0.000060312355,0.00015165877,0.0000065182576,0.000012310493,0.000046185196,0.00014912355,0.00000994874],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010373823,0.0000068897475,0.000011135582,0.101686895,0.00013342215,3.942965e-7,0.00010541537,0.0000061866585,0.0000048693287,0.0000056011927,0.8978616,0.00017653675],"study_design_scores_gemma":[0.0036779302,0.00047846124,0.00043230705,0.6170133,0.0007426499,0.000011138391,0.00002857927,0.0014802978,0.00030916475,0.000013017476,0.37510526,0.0007079136],"about_ca_topic_score_codex":0.000018714347,"about_ca_topic_score_gemma":0.000044748125,"teacher_disagreement_score":0.88131136,"about_ca_system_score_codex":0.000023507408,"about_ca_system_score_gemma":0.000020708472,"threshold_uncertainty_score":0.9987451},"labels":[],"label_agreement":null},{"id":"W6966642532","doi":"10.4224/23002873","title":"Evaluation of thermal and moisture response of highly insulated wood-frame wall assemblies: Part I: experimental trials in the field exposure of walls test facility","year":2016,"lang":"en","type":"report","venue":"NPARC","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Thermal; Field (mathematics); Moisture; Test (biology); Test method; Mockup","score_opus":0.0467675011065975,"score_gpt":0.3111925990817375,"score_spread":0.26442509797514,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6966642532","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98659575,0.0034474577,0.0001203982,0.00008547866,0.0003193035,0.0013884087,0.0002147386,0.0000366003,0.0077918614],"genre_scores_gemma":[0.9993351,0.00031290008,0.000060737817,0.0000059662466,0.000045118944,0.00010290155,0.00004264843,0.000022540378,0.00007207155],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99489707,0.001743677,0.0015277157,0.00024033661,0.0014094348,0.0001817843],"domain_scores_gemma":[0.9947759,0.003362822,0.00070668536,0.00052702846,0.00059814844,0.000029401936],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.015495405,0.00025604045,0.0009780369,0.00024002412,0.000015170048,0.000012745806,0.00023262769,0.00052820373,0.00011999327],"category_scores_gemma":[0.008738,0.00017436245,0.00013125184,0.00027543452,0.00004084181,0.00008936678,0.000030191637,0.00023813908,7.395823e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000681204,0.00033575416,0.002801661,0.00092270254,0.00048534857,0.0000046935584,0.0045783035,0.004922319,0.9722957,0.000010004886,0.005665482,0.007296831],"study_design_scores_gemma":[0.006741796,0.0024090353,0.03303475,0.0032188487,0.0010258288,0.000034339446,0.0007325072,0.0095975185,0.9390408,0.00019925743,0.0029310915,0.0010342613],"about_ca_topic_score_codex":0.00008162511,"about_ca_topic_score_gemma":0.000015817779,"teacher_disagreement_score":0.03325493,"about_ca_system_score_codex":0.0002466867,"about_ca_system_score_gemma":0.00044378013,"threshold_uncertainty_score":0.9996118},"labels":[],"label_agreement":null},{"id":"W6969077240","doi":"10.5281/zenodo.7949371","title":"Evolutionarily distinct species have fewer interactions in frugivore networks","year":2023,"lang":"en","type":"other","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Frugivore; Foraging; Nestedness; Code (set theory); Biodiversity","score_opus":0.022793418754847104,"score_gpt":0.22425649775500808,"score_spread":0.20146307900016097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6969077240","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000133658,0.00043299445,0.10062747,0.00007551169,0.0007527654,0.00058642443,0.000240008,0.00665021,0.89062124],"genre_scores_gemma":[0.17243972,0.0010710385,0.0005396156,0.000057614947,0.001996991,0.0000010964285,0.007951979,0.057060752,0.7588812],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983508,0.00022973253,0.00032333806,0.00037922108,0.0002905947,0.0004263363],"domain_scores_gemma":[0.9991606,0.000044017008,0.00010223398,0.00043776876,0.00014855445,0.00010683617],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0004083262,0.0002547795,0.00024744103,0.0007622537,0.0003863157,0.00034980883,0.0006124008,0.00015338628,0.018124107],"category_scores_gemma":[0.0004229372,0.00030039292,0.0000608275,0.0008250515,0.00006596531,0.0001351241,0.0003042548,0.00052450655,0.0052346415],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000060685784,0.000026169711,0.000015022172,0.00008168463,0.000063927815,0.000016573467,0.00024168812,0.016942814,0.0000099449635,0.0002966664,0.97555584,0.0067436066],"study_design_scores_gemma":[0.00019564536,0.000026459616,0.0004103434,0.00023378807,0.000011386199,0.000021672466,0.00008459049,0.074175864,0.000001937663,0.000010323641,0.9245655,0.00026249618],"about_ca_topic_score_codex":0.00007123833,"about_ca_topic_score_gemma":0.00006710644,"teacher_disagreement_score":0.17242636,"about_ca_system_score_codex":0.00059170846,"about_ca_system_score_gemma":0.0000030158308,"threshold_uncertainty_score":0.9999448},"labels":[],"label_agreement":null},{"id":"W6979698751","doi":"","title":"ABB wins $35MM electric transmission upgrade in Canada","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Upgrade; Transmission (telecommunications); Siemens; Electric power transmission; Work (physics)","score_opus":0.0018568489375501876,"score_gpt":0.14580584395930357,"score_spread":0.14394899502175337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6979698751","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000017364971,0.0023164952,0.11334065,0.00003158826,0.0004155999,0.00033517805,0.0000032968098,0.000475944,0.88306385],"genre_scores_gemma":[0.13778397,0.0017154687,0.00255518,0.00017933603,0.0003729091,0.00007339298,0.00010163296,0.0018512979,0.8553668],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989457,0.000032236585,0.00025533236,0.00020418409,0.00021607651,0.0003464626],"domain_scores_gemma":[0.9996181,0.000022990354,0.00004023007,0.00022740534,0.0000065193053,0.000084725296],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000059191912,0.00025975183,0.00032940158,0.0004031413,0.000008604189,0.0000110477395,0.00018108531,0.0003266132,0.0014270389],"category_scores_gemma":[0.0000051164766,0.00025285713,0.00003076793,0.0005367253,0.0000020090363,0.000020074958,0.000003932724,0.00032689163,0.000046788067],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.341145e-7,0.000004821808,0.0000920867,0.00018994344,0.000027643735,0.0000075398875,0.000012661012,0.011820111,0.00015243952,0.000045397326,0.9822253,0.0054211463],"study_design_scores_gemma":[0.00029482238,0.000012511383,0.00011639186,0.0002102157,0.000013668719,0.0000064861833,0.0000025916338,0.17581764,0.00034869707,0.000005150231,0.8227313,0.00044051226],"about_ca_topic_score_codex":0.70788735,"about_ca_topic_score_gemma":0.9231155,"teacher_disagreement_score":0.21522819,"about_ca_system_score_codex":0.00077324314,"about_ca_system_score_gemma":0.0003631773,"threshold_uncertainty_score":0.9999924},"labels":[],"label_agreement":null},{"id":"W6979850435","doi":"","title":"AltaLink Receives Regulatory Approval to Enable Alberta Wind Power","year":2011,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Power (physics); Government (linguistics); Boom","score_opus":0.005230592427582299,"score_gpt":0.17251052654124324,"score_spread":0.16727993411366093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6979850435","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000015256152,0.0008366807,0.012156296,0.000014308219,0.0012599023,0.0005624064,0.0000055044748,0.000925684,0.98422396],"genre_scores_gemma":[0.0015144637,0.000044823006,0.005816376,0.0000674559,0.00023906383,0.000025898382,0.00002918069,0.0009555127,0.9913072],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987917,0.000024569768,0.00026126014,0.0003539726,0.00018601256,0.00038248205],"domain_scores_gemma":[0.99911284,0.000020420845,0.00005937394,0.00063385285,0.000023959961,0.00014955188],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00009314257,0.0003577485,0.00036680105,0.00038791282,0.00001789246,0.000028949416,0.00028214316,0.0004645515,0.011425354],"category_scores_gemma":[0.000022676062,0.00035168187,0.0000676745,0.00028557613,0.000014616999,0.000060272945,0.000035482102,0.00016068516,0.0021901387],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000024797275,0.000010913242,0.000009627157,0.00009132039,0.00012227382,0.0000021682988,0.00024057561,0.00081027707,0.00008777392,0.00064445054,0.9977401,0.00023807069],"study_design_scores_gemma":[0.00014312849,0.000033450815,0.0000114213235,0.00016815714,0.000023327377,0.000008083273,0.000015655094,0.0005320752,0.0008982542,0.00001986369,0.9976061,0.0005404678],"about_ca_topic_score_codex":0.00063564436,"about_ca_topic_score_gemma":0.00044759276,"teacher_disagreement_score":0.009235214,"about_ca_system_score_codex":0.00009252072,"about_ca_system_score_gemma":0.000034146567,"threshold_uncertainty_score":0.99989355},"labels":[],"label_agreement":null},{"id":"W6980409001","doi":"","title":"Canadian, Australian funds invest in Finland power grid","year":2013,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power grid; Power (physics); Government (linguistics); Investment (military); Work (physics)","score_opus":0.004842207085620813,"score_gpt":0.17378099931208948,"score_spread":0.16893879222646868,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6980409001","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000026414547,0.0003157976,0.00026569932,0.00008643439,0.0010599646,0.0003025703,0.000028821167,0.0002652341,0.9976491],"genre_scores_gemma":[0.0042477977,0.00005799202,0.00050205283,0.000066848086,0.00014041574,0.000033474582,0.00006847341,0.00040898172,0.99447393],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991525,0.000015035925,0.00018535944,0.0001702943,0.000091959766,0.00038485051],"domain_scores_gemma":[0.999512,0.00000750043,0.00002562953,0.00025244817,0.000009412566,0.00019298645],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000046826768,0.0002287131,0.00022859985,0.00070832344,0.0000075797525,0.00004273185,0.00015487999,0.0004143831,0.017516647],"category_scores_gemma":[0.000006644988,0.00023137475,0.000025024328,0.0002968814,0.0000071982236,0.00004648784,0.0000064530336,0.00019492762,0.0021607487],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.0497466e-8,0.0000017490636,0.00076403323,0.000042670006,0.000019675457,0.000008818931,0.000017206776,0.0010261948,0.0000024935348,0.00012238727,0.9979424,0.000052320403],"study_design_scores_gemma":[0.00012754624,0.000007545593,0.00036507056,0.00010251212,0.0000043259247,0.0000046015216,0.000005737066,0.0019116906,0.000009746901,0.0000039257307,0.99715096,0.00030634674],"about_ca_topic_score_codex":0.24856041,"about_ca_topic_score_gemma":0.5916792,"teacher_disagreement_score":0.34311882,"about_ca_system_score_codex":0.00035898178,"about_ca_system_score_gemma":0.00008347336,"threshold_uncertainty_score":0.99861616},"labels":[],"label_agreement":null},{"id":"W6980412434","doi":"","title":"Capital Power Reports Fourth Quarter and Year-End 2014 Results - Energy (ENERGY01) News","year":2015,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Capital (architecture); Energy (signal processing); Power (physics); Capital expenditure","score_opus":0.0035661587379635065,"score_gpt":0.1746114863136785,"score_spread":0.171045327575715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6980412434","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000013248679,0.0024609503,0.011547393,0.000032253087,0.0014604181,0.0001290906,0.000040061233,0.0008345811,0.983482],"genre_scores_gemma":[0.014227996,0.00039930915,0.0022097302,0.00003962475,0.00045968138,0.000019673163,0.0003741447,0.0006930876,0.98157674],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985244,0.000034350123,0.00042844398,0.00041523873,0.00028511538,0.0003124303],"domain_scores_gemma":[0.9990391,0.00001654062,0.00015225133,0.0005755459,0.00004496113,0.00017161238],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00014232803,0.00035541464,0.0003805467,0.00029628794,0.0000141549135,0.000063675165,0.00009169758,0.00043135966,0.0010498507],"category_scores_gemma":[0.000022588714,0.00032879782,0.00004513285,0.00013853921,0.000019594896,0.00007939514,0.000028427328,0.00012720555,0.00008972495],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004494092,0.000006973237,0.000011634117,0.000020358608,0.000080703314,0.00006373725,0.00007969018,0.00065959897,0.000008615657,0.0001834901,0.99871737,0.00016335002],"study_design_scores_gemma":[0.00037004956,0.000057111123,0.000008856395,0.00006706863,0.000023991026,0.00012191826,0.000036327983,0.0013954042,0.000019171048,0.000046148572,0.9973925,0.00046145642],"about_ca_topic_score_codex":0.0013055907,"about_ca_topic_score_gemma":0.0022090469,"teacher_disagreement_score":0.014214747,"about_ca_system_score_codex":0.00007677175,"about_ca_system_score_gemma":0.000051232593,"threshold_uncertainty_score":0.99991643},"labels":[],"label_agreement":null},{"id":"W6980443612","doi":"","title":"Capital Power places 202-MW turbine order with Vestas for Alberta auction project","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Order (exchange); Power (physics); Capital (architecture); Turbine; Work (physics); Government (linguistics)","score_opus":0.003992880519686611,"score_gpt":0.19743708496085802,"score_spread":0.1934442044411714,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6980443612","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000054780132,0.00040865596,0.13298398,0.000026738093,0.0011618928,0.0016823513,0.00002491888,0.00087056874,0.8627861],"genre_scores_gemma":[0.00082759437,0.000045890545,0.0125713935,0.000013969569,0.00043984005,0.0002303173,0.00023491176,0.0008428327,0.98479325],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989838,0.0000145429,0.00019405963,0.0003194337,0.00017094285,0.00031723955],"domain_scores_gemma":[0.999452,0.00003874137,0.00008495976,0.0003008965,0.000081187834,0.00004219091],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00006187997,0.00035530876,0.00030218635,0.0003063496,0.000028469882,0.00005115966,0.00013428068,0.00031358495,0.0023709235],"category_scores_gemma":[0.000026007847,0.0002801526,0.000038838156,0.0003381801,0.000024799903,0.00009283907,0.000011764677,0.0000912815,0.00021508764],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021231055,0.000015667758,0.000012496287,0.00021607302,0.00023764059,9.3866885e-7,0.00016299746,0.0011959977,0.00001683619,0.000099353965,0.9979577,0.00006306189],"study_design_scores_gemma":[0.00077604916,0.0003930249,0.000004583629,0.00023023618,0.000089043184,0.000032758584,0.00006155089,0.01425033,0.00016715426,0.0000051145994,0.9833459,0.00064423116],"about_ca_topic_score_codex":0.00079381623,"about_ca_topic_score_gemma":0.0034879006,"teacher_disagreement_score":0.12200713,"about_ca_system_score_codex":0.000101247104,"about_ca_system_score_gemma":0.00007565632,"threshold_uncertainty_score":0.9999651},"labels":[],"label_agreement":null},{"id":"W6982557839","doi":"","title":"Innergex and the In-SHUCK-ch Nation sign a partnership agreement to develop six hydroelectric projects in British Columbia - TSX (TSXTSX01) News","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"General partnership; Sign (mathematics); Hydroelectricity; Agreement","score_opus":0.009331781836135986,"score_gpt":0.1968042842872421,"score_spread":0.1874725024511061,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6982557839","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004817378,0.0029919385,0.02951674,0.00034687103,0.0006224352,0.0075063594,0.000006951979,0.0008917969,0.9532995],"genre_scores_gemma":[0.59910744,0.0009289287,0.0023268068,0.0005731419,0.0003232017,0.0014144547,0.000102301914,0.0007391561,0.39448455],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99784535,0.00023936924,0.0005826675,0.00046506894,0.00035239494,0.000515145],"domain_scores_gemma":[0.9992722,0.00016946449,0.00012166964,0.00029024668,0.00006222573,0.00008418983],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00076841674,0.00028216615,0.0005396187,0.0006171643,0.00003519852,0.0002993797,0.00025325862,0.00036092883,0.00027876216],"category_scores_gemma":[0.00035977486,0.00035154357,0.000029658639,0.0024404665,0.000023250903,0.00007393128,0.000047726,0.00029930627,0.000059098144],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000177353,0.000056215056,0.0066968002,0.00047893717,0.000102014244,0.000025326573,0.0007125252,0.0062879613,0.000017794504,0.00024403947,0.9658036,0.019557044],"study_design_scores_gemma":[0.016296314,0.00053757237,0.013010586,0.0038677794,0.0001631324,0.00013585531,0.00037906363,0.28251648,0.0001375663,0.00046151178,0.6774368,0.0050573056],"about_ca_topic_score_codex":0.034114186,"about_ca_topic_score_gemma":0.65080905,"teacher_disagreement_score":0.61669487,"about_ca_system_score_codex":0.00039352922,"about_ca_system_score_gemma":0.00012835588,"threshold_uncertainty_score":0.99989367},"labels":[],"label_agreement":null},{"id":"W6983221179","doi":"","title":"Load flow feasibility under extreme contingencies","year":2007,"lang":"en","type":"dissertation","venue":"eScholarship@McGill (McGill)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Work (physics)","score_opus":0.02592225306464615,"score_gpt":0.2450732642547654,"score_spread":0.21915101119011923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6983221179","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6020889,0.0036879873,0.00018036747,0.0000053711747,0.006652529,0.0018999419,0.0006467377,0.0028298064,0.38200834],"genre_scores_gemma":[0.984059,0.0003362707,0.0028225179,0.00008064376,0.00011939228,0.000117012714,0.0011332093,0.0004902404,0.010841719],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99456364,0.00022574239,0.0014480541,0.0011616922,0.0013777142,0.0012231837],"domain_scores_gemma":[0.99692035,0.00026925723,0.00041679374,0.001156051,0.00084643404,0.00039110996],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.001718123,0.0011307935,0.0010539828,0.0005678844,0.00063487864,0.00014526161,0.00075737375,0.0014741002,0.00034336536],"category_scores_gemma":[0.00073401805,0.0013181462,0.00043186918,0.0011823254,0.00004337491,0.0010102587,0.00006153993,0.0017784626,0.00048288802],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001185093,0.0012477121,0.0004945022,0.009604275,0.003903905,0.0005277742,0.00024078223,0.121827856,0.29390633,0.066757336,0.0005463435,0.4997581],"study_design_scores_gemma":[0.011744636,0.0010113918,0.014099318,0.0062069967,0.0030102455,0.00040167943,0.00264373,0.05604169,0.6497124,0.043994915,0.18990591,0.021227073],"about_ca_topic_score_codex":0.0001527311,"about_ca_topic_score_gemma":0.003042525,"teacher_disagreement_score":0.478531,"about_ca_system_score_codex":0.0036828066,"about_ca_system_score_gemma":0.00010738275,"threshold_uncertainty_score":0.9998222},"labels":[],"label_agreement":null},{"id":"W6983306794","doi":"","title":"Manitoba Hydro Does Wisconsin Power Sales to Help Hydro Projects","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydro power; Power (physics); Hydroelectricity; Hydropower","score_opus":0.005926439511053578,"score_gpt":0.19342926693259715,"score_spread":0.1875028274215436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6983306794","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00015779941,0.00058800774,0.048575047,0.0000660938,0.0019183278,0.0010935278,0.000019350691,0.0027803152,0.9448015],"genre_scores_gemma":[0.06934088,0.000098120276,0.008156231,0.0002638896,0.0008065977,0.00015648131,0.00009457325,0.0018910394,0.9191922],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.998452,0.000047356276,0.00032117392,0.000427435,0.0002870705,0.00046494982],"domain_scores_gemma":[0.9990941,0.000039922073,0.000076221746,0.0006234571,0.000026714997,0.00013957363],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00012520351,0.00048493285,0.00049665757,0.00062054273,0.000024777279,0.000079958125,0.00029787887,0.00042164113,0.0011888847],"category_scores_gemma":[0.000035767687,0.0003829034,0.00007863224,0.00033490482,0.000017498733,0.000055612014,0.000047302176,0.00019021043,0.0029810807],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000022138547,0.00001347095,0.000053372853,0.00021661038,0.00011829671,0.000010103051,0.0000826374,0.0015798061,0.00026745768,0.00021720343,0.99703586,0.00040295647],"study_design_scores_gemma":[0.00027152983,0.00007001391,0.000015019707,0.0005638211,0.000043843622,0.000020115325,0.000050840095,0.006213708,0.0015251107,0.000022360438,0.9902121,0.0009915767],"about_ca_topic_score_codex":0.00025618155,"about_ca_topic_score_gemma":0.0032285573,"teacher_disagreement_score":0.069183074,"about_ca_system_score_codex":0.00015258507,"about_ca_system_score_gemma":0.00003522482,"threshold_uncertainty_score":0.9998623},"labels":[],"label_agreement":null},{"id":"W6983450256","doi":"","title":"The Mental Health Toll of the COVID-19 Pandemic on Older Adults with Migraine: A Prospective Analysis of Depression Using the Canadian Longitudinal Study on Aging","year":2024,"lang":"en","type":"article","venue":"DOAJ (DOAJ: Directory of Open Access Journals)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Depression (economics); Longitudinal study; Mental health; Pandemic; Life course approach; Public health; Multivariate analysis; Logistic regression; Cohort","score_opus":0.148811829697152,"score_gpt":0.5025531031685565,"score_spread":0.3537412734714045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6983450256","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98526603,0.010174718,0.0015981669,0.00028317055,0.00034300046,0.0019273765,0.00006501405,0.000039993978,0.00030251645],"genre_scores_gemma":[0.9991827,0.00056845066,0.00002095208,0.000083316205,0.000031961565,0.000042962864,0.0000044870767,0.00004131003,0.000023841973],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99746394,0.00042452544,0.00066700997,0.00032355895,0.00079234614,0.00032863326],"domain_scores_gemma":[0.998223,0.00046743453,0.00046665553,0.0005164809,0.0001438756,0.00018255464],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017214047,0.0002517651,0.0005427505,0.0008898426,0.000613512,0.000434267,0.0012090964,0.00005140474,0.00009243557],"category_scores_gemma":[0.00013383791,0.00013073526,0.00016545391,0.0031150396,0.00008113898,0.00035718776,0.0001303641,0.000421514,3.2028467e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012104087,0.00007471388,0.85148984,0.000103342354,0.0014624749,0.0000068068002,0.0046531255,0.13963203,0.00029793748,0.000015013964,0.0013376108,0.0008060673],"study_design_scores_gemma":[0.0005950152,0.000046828445,0.950823,0.0014554871,0.000492328,0.000020999109,0.0011217548,0.044282883,0.0007812442,0.000029616966,0.00013157062,0.00021924643],"about_ca_topic_score_codex":0.06905202,"about_ca_topic_score_gemma":0.16676594,"teacher_disagreement_score":0.0993332,"about_ca_system_score_codex":0.0011547214,"about_ca_system_score_gemma":0.0005268299,"threshold_uncertainty_score":0.93714726},"labels":[],"label_agreement":null},{"id":"W6987175843","doi":"","title":"SNL: Developer seeks DOE permit for power line to connect Alaska hydro project to Canada","year":2013,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydro power; Hydroelectricity; Line (geometry); Power (physics); Process (computing); Hydropower","score_opus":0.0073596690527900814,"score_gpt":0.20982683603559887,"score_spread":0.20246716698280878,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6987175843","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00008191497,0.0002873114,0.19613321,0.00032455768,0.0018617357,0.004868522,0.00015273254,0.000996823,0.7952932],"genre_scores_gemma":[0.0045886445,0.000012118156,0.01987688,0.0009729952,0.0002905931,0.00091757166,0.00011962913,0.0010749104,0.97214663],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982944,0.000019868507,0.0003690616,0.00045217513,0.00027401533,0.00059049384],"domain_scores_gemma":[0.9991195,0.000061981526,0.000051553892,0.0004456115,0.00011178648,0.00020955686],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00010384035,0.00048524723,0.00052289787,0.00041637395,0.000030714873,0.000061825056,0.0003275826,0.000310347,0.0018650359],"category_scores_gemma":[0.00009047537,0.00043475264,0.000057604062,0.00047019092,0.000003958834,0.000035250716,0.000043920056,0.00013778343,0.0002738032],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000036030983,0.000005484743,0.000007408188,0.00013599887,0.00012993302,0.000003295504,0.00010228671,0.0057417075,0.000046765712,0.00004507457,0.993124,0.0006544247],"study_design_scores_gemma":[0.0002429698,0.000083987165,0.000005113838,0.00015409851,0.000021894895,0.000007909973,0.000028154307,0.007687881,0.00043167287,5.787159e-7,0.9905892,0.0007465246],"about_ca_topic_score_codex":0.17280135,"about_ca_topic_score_gemma":0.5760824,"teacher_disagreement_score":0.40328106,"about_ca_system_score_codex":0.00057521503,"about_ca_system_score_gemma":0.00057959766,"threshold_uncertainty_score":0.9998104},"labels":[],"label_agreement":null},{"id":"W6987531942","doi":"","title":"TD Opens First Net-Zero Energy Bank Branch in Canada","year":2011,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Energy (signal processing); Energy consumption; Key (lock); Field (mathematics)","score_opus":0.004309113360227615,"score_gpt":0.14480354843455762,"score_spread":0.14049443507433002,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6987531942","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00000252641,0.0015851795,0.04276101,0.00000879524,0.0009604872,0.0001393796,0.000011126341,0.00024703215,0.9542845],"genre_scores_gemma":[0.061640017,0.00057193503,0.00044990695,0.000080802645,0.00012615611,0.00004873134,0.000046038276,0.0007196831,0.9363167],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99912065,0.000014967905,0.00022618497,0.00019670793,0.00013634952,0.00030512648],"domain_scores_gemma":[0.99955493,0.000017181266,0.000041808784,0.00031041916,0.000009719108,0.00006593905],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00003173098,0.00024371126,0.00030309948,0.00021000861,0.000009512286,0.000013192374,0.00023189132,0.00019762946,0.0071029076],"category_scores_gemma":[0.0000049253263,0.00025253685,0.000022145392,0.00025917537,0.0000039277397,0.000030768733,0.000019856403,0.00011318152,0.0000598611],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.8706627e-7,0.0000030566612,0.00015171924,0.00006703546,0.000035003643,0.000012502979,0.000014014253,0.008441985,0.0000012082022,0.00032514927,0.9901956,0.0007521772],"study_design_scores_gemma":[0.00018730706,0.000005323421,0.000058246438,0.00014318762,0.000007134607,0.000004937257,0.0000016556988,0.009804466,0.00007220016,0.0000093525,0.98934525,0.0003609402],"about_ca_topic_score_codex":0.9831829,"about_ca_topic_score_gemma":0.9988438,"teacher_disagreement_score":0.06163749,"about_ca_system_score_codex":0.0005372513,"about_ca_system_score_gemma":0.00025472674,"threshold_uncertainty_score":0.99999267},"labels":[],"label_agreement":null},{"id":"W6987717041","doi":"","title":"Transmission pricing","year":2000,"lang":"en","type":"dissertation","venue":"TSpace (University of Toronto)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Toronto","keywords":"","score_opus":0.004410312274074996,"score_gpt":0.19331925250194118,"score_spread":0.1889089402278662,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6987717041","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.069022045,0.008028967,0.017947098,0.00002336629,0.0005528444,0.00041467723,0.000008510481,0.00054874935,0.90345377],"genre_scores_gemma":[0.9501025,0.0047306726,0.0031390234,0.0000017788992,0.000037983275,3.276052e-7,0.0003159091,0.00006404069,0.04160773],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935466,0.000020681457,0.00009976248,0.00016605564,0.00018653266,0.00017233306],"domain_scores_gemma":[0.99962205,0.000013982336,0.00007311521,0.00018323112,0.00004270084,0.00006490568],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0000474131,0.00017559408,0.0002816133,0.00006515031,0.00006739812,0.0000068696113,0.00020468896,0.00027731358,0.010935539],"category_scores_gemma":[0.0000015902668,0.00024603578,0.000101050246,0.000082907194,0.000007960294,0.0002517251,0.0000037030984,0.00012710967,0.000024381101],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044116963,0.000078176585,0.00003332557,0.0024148237,0.00044246102,0.000032731677,0.07083397,0.034025505,0.010418697,0.00011619979,0.0076321308,0.8735308],"study_design_scores_gemma":[0.0071970476,0.0009530557,0.22349134,0.007305501,0.0024868087,0.00003351786,0.07051469,0.5449749,0.01216925,0.000060067963,0.124121584,0.0066922363],"about_ca_topic_score_codex":0.010341856,"about_ca_topic_score_gemma":0.009516658,"teacher_disagreement_score":0.8810805,"about_ca_system_score_codex":0.0003533902,"about_ca_system_score_gemma":0.00004678774,"threshold_uncertainty_score":0.99999917},"labels":[],"label_agreement":null},{"id":"W6987748689","doi":"","title":"Tohoku Electric Power : Financial Results for the First Quarter of Fiscal 2019","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Electric power; Power (physics); Electric utility; Measure (data warehouse)","score_opus":0.0034305712901298996,"score_gpt":0.18380597226431772,"score_spread":0.1803754009741878,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6987748689","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000032269322,0.0023529031,0.10925429,0.00019629832,0.0018291592,0.0015321843,0.0001435331,0.00035055666,0.88433784],"genre_scores_gemma":[0.013438018,0.00022665963,0.00077119976,0.000073177594,0.00044895386,0.000107531814,0.000073729585,0.0005156632,0.9843451],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99891454,0.000011694101,0.00036614735,0.00022396393,0.00018266325,0.00030097037],"domain_scores_gemma":[0.99910265,0.00019930636,0.00013239791,0.00050895277,0.000032201995,0.000024515382],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015114421,0.00025486838,0.00035317903,0.00022250334,0.000021828582,0.00001802471,0.00029952265,0.00038853782,0.00018441689],"category_scores_gemma":[0.00005940856,0.00018216643,0.0001343281,0.0002866749,0.000009413255,0.00003058114,0.000013652199,0.00015207786,0.00016713461],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002414607,0.0000100756215,0.000005685161,0.00011583389,0.00006748145,2.1753905e-7,0.000048842474,0.0021408112,0.000010531817,0.00026509192,0.9971166,0.00019463271],"study_design_scores_gemma":[0.0007888687,0.00014267211,0.00009377319,0.00010446093,0.000047524336,0.0000024319475,0.000003897442,0.02925137,0.00014331707,0.000008704605,0.9691252,0.0002877573],"about_ca_topic_score_codex":0.0000641057,"about_ca_topic_score_gemma":0.000125137,"teacher_disagreement_score":0.10848309,"about_ca_system_score_codex":0.000058441277,"about_ca_system_score_gemma":0.000038187085,"threshold_uncertainty_score":0.74285316},"labels":[],"label_agreement":null},{"id":"W6988107879","doi":"","title":"Wind Power in Canada, Market Outlook to 2030, Update 2017 – Capacity, Generation, Levelized Cost of Energy (LCOE), Investment Trends, Regulations and Company Profiles","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Investment (military); Cost of electricity by source; Energy (signal processing); Power (physics); Renewable energy; Electricity; Power station","score_opus":0.01466204847592147,"score_gpt":0.2030198627333538,"score_spread":0.1883578142574323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6988107879","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005625816,0.000955052,0.019064378,0.00015406004,0.00080998545,0.0006457379,0.0004898912,0.0001467379,0.9771716],"genre_scores_gemma":[0.07971241,0.00029113062,0.013166822,0.00034544265,0.00028546283,0.00016621774,0.0008558648,0.0005926188,0.90458405],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985688,0.00006484327,0.00049292867,0.0003168433,0.00027364882,0.00028295937],"domain_scores_gemma":[0.9992149,0.000019341436,0.00014644918,0.00040677018,0.000070670074,0.0001418591],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00011566851,0.00032801207,0.00048446158,0.00065356266,0.000029554973,0.000029433202,0.00016265585,0.0001847855,0.004037131],"category_scores_gemma":[0.000014471957,0.00033457746,0.0000262773,0.00033766523,0.000032240776,0.000061360144,0.000038770086,0.00006945423,0.0000075521466],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000036659046,0.000011589059,0.0003359903,0.000045180946,0.00009144614,0.0000015172445,0.00004377224,0.005065149,0.00017913168,0.00059007714,0.99347335,0.00015911768],"study_design_scores_gemma":[0.0010479508,0.000034837754,0.0034486495,0.00034540013,0.000056743913,0.000011990125,0.000024394365,0.09568247,0.0015872004,0.000018191917,0.89685965,0.0008825397],"about_ca_topic_score_codex":0.31958684,"about_ca_topic_score_gemma":0.92364806,"teacher_disagreement_score":0.6040612,"about_ca_system_score_codex":0.00048099883,"about_ca_system_score_gemma":0.00028806325,"threshold_uncertainty_score":0.99991065},"labels":[],"label_agreement":null},{"id":"W6988131567","doi":"","title":"Wind power's prevailing direction in Canada? Big and foreign-owned","year":2013,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Field (mathematics); Work (physics); Global Positioning System; Term (time)","score_opus":0.003524814941055924,"score_gpt":0.15345400977509424,"score_spread":0.14992919483403833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6988131567","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00042999708,0.0024324532,0.00450511,0.0000050560493,0.00062000926,0.00043824688,0.00000474738,0.00031228847,0.99125206],"genre_scores_gemma":[0.25713673,0.0007810741,0.0011500147,0.000030185382,0.00019778468,0.000048460013,0.00003427917,0.00077459513,0.7398469],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999296,0.000015965234,0.00018609139,0.00017743929,0.000115658826,0.00020880681],"domain_scores_gemma":[0.99972343,0.000019903948,0.000042228272,0.0001522405,0.000009625632,0.000052584895],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000489991,0.0001891914,0.00022718811,0.00024685788,0.000009247235,0.000022050055,0.00006150569,0.00016952612,0.00061531976],"category_scores_gemma":[0.000011032216,0.00018554014,0.000012317022,0.00018839195,0.0000041567473,0.000036491394,0.000011060446,0.00012265195,0.0000129965465],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000029064067,0.00001027951,0.0044543976,0.00069601176,0.00017734898,0.000014212289,0.00009494849,0.018238265,0.00016332418,0.00025586938,0.9607566,0.015135808],"study_design_scores_gemma":[0.0015664999,0.00006422563,0.004148536,0.0017470937,0.00007429413,0.000054508317,0.00021054049,0.37376818,0.0006238254,0.00004895544,0.61534464,0.0023486887],"about_ca_topic_score_codex":0.70603824,"about_ca_topic_score_gemma":0.88626456,"teacher_disagreement_score":0.35552993,"about_ca_system_score_codex":0.00045680138,"about_ca_system_score_gemma":0.000113221926,"threshold_uncertainty_score":0.7566107},"labels":[],"label_agreement":null},{"id":"W6988158994","doi":"","title":"Wind Power Market (Belgium,Canada) 2016 Market Size , Share , Trend , Analysis , Research Report, Fo","year":2016,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Trend analysis; Wind power; Market size; Market power; Market share; Statistical analysis","score_opus":0.00888836524924279,"score_gpt":0.24870981918787197,"score_spread":0.23982145393862916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6988158994","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000023218367,0.0020394095,0.003965204,0.00015532598,0.00090225396,0.00056383346,0.00048115826,0.00071518164,0.9911753],"genre_scores_gemma":[0.0021487693,0.00041354308,0.00070621684,0.000028880411,0.00038175375,0.00005568687,0.00014311486,0.00089950993,0.9952225],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9953211,0.00030807484,0.00080702925,0.0008954842,0.0015906891,0.0010776562],"domain_scores_gemma":[0.9969223,0.0006416487,0.00024332061,0.0017027345,0.00016524711,0.00032472427],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0012786123,0.000628437,0.0009653308,0.0016222772,0.00008442156,0.00011696786,0.00066817517,0.00068287906,0.33876848],"category_scores_gemma":[0.00037426045,0.0005154169,0.00022482994,0.0021164336,0.000050908257,0.00010994737,0.0001145334,0.00049455644,0.00017304218],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013052636,0.000012949575,0.00024472093,0.00011894715,0.0020281333,0.0003714459,0.000009085742,0.00007930337,0.000011213714,0.000014284687,0.99677014,0.00032671713],"study_design_scores_gemma":[0.00029380928,0.000019803225,0.00056520733,0.00029292825,0.00025571516,0.00004498208,0.000015630088,0.0018707898,0.00001916701,0.000008153599,0.995904,0.00070978125],"about_ca_topic_score_codex":0.02383297,"about_ca_topic_score_gemma":0.27306238,"teacher_disagreement_score":0.33859542,"about_ca_system_score_codex":0.0008905869,"about_ca_system_score_gemma":0.00053797354,"threshold_uncertainty_score":0.99972975},"labels":[],"label_agreement":null},{"id":"W6989107577","doi":"","title":"American Electric Power : Issues Financials for Second Quarter of 2019","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Electric power; Power (physics); Electric utility","score_opus":0.0029023555492346162,"score_gpt":0.20865079567493727,"score_spread":0.20574844012570265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989107577","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00005361116,0.004632142,0.069873974,0.000021275982,0.0007440601,0.0012370134,0.00010117367,0.00051164086,0.9228251],"genre_scores_gemma":[0.009108933,0.00016627558,0.003169566,0.000029193458,0.00015186598,0.00005539016,0.00004572423,0.00060424226,0.9866688],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99903363,0.000017218788,0.00031293367,0.00021682859,0.00012884696,0.0002905643],"domain_scores_gemma":[0.9993167,0.00005373735,0.00018497999,0.0003695942,0.00004437024,0.00003062141],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00008419969,0.0002622488,0.00062577456,0.00042699673,0.0000063716134,0.000012633294,0.00017840468,0.0002052702,0.001999107],"category_scores_gemma":[0.000015030758,0.00025302081,0.000107458,0.00033012204,0.000011194958,0.000034514178,0.0000071293302,0.000083111,0.0002377203],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000031661107,0.000009430445,0.0000105763465,0.00023913944,0.00009515589,1.7837755e-7,0.000037652262,0.00018698345,0.00060679094,0.00023449959,0.9980497,0.00052673125],"study_design_scores_gemma":[0.0002849581,0.00024374266,0.000033410688,0.00009043066,0.000032415974,0.0000015656883,0.00001106958,0.0026675954,0.0026439463,0.000014886662,0.9935582,0.00041776404],"about_ca_topic_score_codex":0.000103228514,"about_ca_topic_score_gemma":0.00006406893,"teacher_disagreement_score":0.06670441,"about_ca_system_score_codex":0.000050465558,"about_ca_system_score_gemma":0.000039662187,"threshold_uncertainty_score":0.9999922},"labels":[],"label_agreement":null},{"id":"W6989134617","doi":"","title":"Alberta Auction Results In 600 MW Of Record-Low Wind Power - North American Windpower","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Power (physics); Offshore wind power; Turbine; Scale (ratio)","score_opus":0.004133449131200736,"score_gpt":0.19823301165215512,"score_spread":0.1940995625209544,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989134617","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010859944,0.000110242116,0.0032099194,0.000026032532,0.001130381,0.00048547614,0.000043537526,0.00026899745,0.9936394],"genre_scores_gemma":[0.2034944,0.00030768657,0.0011553293,0.000013375644,0.00018796531,0.000015448073,0.0001288111,0.0006438003,0.7940532],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99851906,0.000043021697,0.0004907464,0.00037725834,0.00023281403,0.00033711514],"domain_scores_gemma":[0.99866325,0.00004908171,0.0004421546,0.0007414427,0.000032558513,0.00007152974],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00011406662,0.00035659567,0.0006089346,0.00062239263,0.000018863991,0.000026336453,0.00032545716,0.0002497484,0.00042475152],"category_scores_gemma":[0.00009071145,0.0003624082,0.00007979017,0.00041993655,0.000056276047,0.000105659296,0.000028064167,0.0002642518,0.00010556583],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006759012,0.000082452636,0.0024463087,0.0002309705,0.00025447586,0.000010975465,0.00041086003,0.016586266,0.00004619401,0.000013813712,0.973798,0.0060521234],"study_design_scores_gemma":[0.001820694,0.00027514776,0.013702106,0.0011879957,0.00006246881,0.000011023782,0.000033483022,0.0075434083,0.00030582582,0.0000034221512,0.97360367,0.0014507305],"about_ca_topic_score_codex":0.013359595,"about_ca_topic_score_gemma":0.07137455,"teacher_disagreement_score":0.2024084,"about_ca_system_score_codex":0.00015756456,"about_ca_system_score_gemma":0.000046064048,"threshold_uncertainty_score":0.9998828},"labels":[],"label_agreement":null},{"id":"W6989187731","doi":"","title":"Alberta's Electricity Grid Under Strain: A Call for Additional Power Generation","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity generation; Electricity; Power grid; Power (physics); Distributed generation; Grid; Stand-alone power system","score_opus":0.00925936329577534,"score_gpt":0.2090764203364175,"score_spread":0.19981705704064215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989187731","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[2.0475565e-7,0.0008040296,0.33467153,0.000062686035,0.0012987616,0.0005786566,0.0021705192,0.0007629883,0.6596506],"genre_scores_gemma":[0.00036307416,0.00004630286,0.0045487764,0.00013992596,0.0016743218,0.00036669266,0.0068238312,0.000938258,0.98509884],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989428,0.000014851715,0.00024230081,0.00031934623,0.00019270134,0.0002880288],"domain_scores_gemma":[0.99960357,0.00006162487,0.000044871253,0.00018896896,0.000039449526,0.000061526145],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000059578862,0.0002996033,0.0002412007,0.00032358605,0.000019130292,0.000071283466,0.000103208054,0.00039247272,0.01897237],"category_scores_gemma":[0.000024043791,0.00029546858,0.000110984314,0.00024529733,0.0000082856695,0.000047302485,0.000008289368,0.0001674603,0.00063913723],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010054096,0.000009673218,5.7744586e-8,0.000095460826,0.00017658451,9.742741e-7,0.000011930604,0.0035259426,0.00013804002,0.004381698,0.99155694,0.00010167017],"study_design_scores_gemma":[0.00014872904,0.00003493185,8.996283e-7,0.000070180125,0.000045891884,0.000010141993,0.0000016922993,0.07709243,0.00007793347,0.00013041466,0.92203194,0.00035479807],"about_ca_topic_score_codex":0.00009312729,"about_ca_topic_score_gemma":0.0012471162,"teacher_disagreement_score":0.33012277,"about_ca_system_score_codex":0.00021255984,"about_ca_system_score_gemma":0.000062595216,"threshold_uncertainty_score":0.99994975},"labels":[],"label_agreement":null},{"id":"W6989667273","doi":"","title":"Canada's non-hydro renewable power capacity continues to increase | Stock Market | NYSE Composite Stock Quote | NYA Company Stock Market Quotes","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Stock (firearms); Stock market; Stock exchange; Stock market bubble; Market maker; Renewable energy","score_opus":0.006639237696408273,"score_gpt":0.2018735086147402,"score_spread":0.19523427091833193,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989667273","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010138238,0.0010123218,0.018883929,0.000096394324,0.0019692888,0.0026979628,0.0014076462,0.0012208655,0.97169775],"genre_scores_gemma":[0.050992627,0.000090723996,0.005624079,0.0002818865,0.00041212907,0.00020862214,0.00024256796,0.0013097774,0.94083756],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99550486,0.00026587248,0.0008557788,0.0010453826,0.00097425474,0.0013538806],"domain_scores_gemma":[0.99593633,0.00024753623,0.0005305385,0.00222783,0.00021375799,0.00084398227],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.00055331376,0.0013584552,0.0017708618,0.0007039483,0.00027304547,0.00034064375,0.0013818275,0.000771747,0.0046084668],"category_scores_gemma":[0.00019734695,0.0014357734,0.00020408143,0.00042668654,0.0000782237,0.00021925189,0.00024329098,0.000654389,0.00007807364],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007765102,0.000048600552,0.0011599973,0.00041918576,0.0005432103,0.000055544402,0.000051323954,0.004874879,0.00019970587,0.0000030498973,0.9923692,0.00019766128],"study_design_scores_gemma":[0.0012540112,0.000116859126,0.0022871778,0.001239934,0.00021078554,0.000050867373,0.000013426617,0.055577796,0.00031177507,0.0000042217844,0.93674207,0.0021910726],"about_ca_topic_score_codex":0.8099907,"about_ca_topic_score_gemma":0.88407516,"teacher_disagreement_score":0.07408445,"about_ca_system_score_codex":0.0012003208,"about_ca_system_score_gemma":0.0006987067,"threshold_uncertainty_score":0.9999166},"labels":[],"label_agreement":null},{"id":"W6989698510","doi":"","title":"The Canada Data Center Colocation Market to Soar with $1.85 Billion Investment by 2029, Adding Over 960 MW Power Capacity – Arizton – Shimla Online","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Soar; Investment (military); Data center; Center (category theory); Power (physics); Power market; Market power","score_opus":0.008325930066935869,"score_gpt":0.19773396799154552,"score_spread":0.18940803792460964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989698510","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00014092968,0.0032010172,0.016310325,0.0010331011,0.004082651,0.0026775408,0.005315956,0.0010435906,0.96619487],"genre_scores_gemma":[0.00625302,0.00040754915,0.0033976545,0.0011913794,0.00034254952,0.00014209098,0.0043645687,0.0012604911,0.9826407],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99805796,0.00006540458,0.00034749272,0.0005714119,0.000528268,0.00042946273],"domain_scores_gemma":[0.99854535,0.00005305344,0.00009753067,0.0011057699,0.000041733376,0.00015655706],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00023521358,0.00043633443,0.00029938883,0.0001838987,0.000054389002,0.00017154764,0.00055513915,0.00021190969,0.0010110409],"category_scores_gemma":[0.00003319517,0.00030056006,0.000024533647,0.0005217197,0.00002551678,0.00010238078,0.00013395837,0.00030835028,0.000048185648],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009171144,0.000019005345,0.00002613273,0.00011882037,0.00023405578,0.000004571206,0.000024709801,0.0006093153,0.00002368332,0.000097685275,0.9987067,0.00012616208],"study_design_scores_gemma":[0.00018216489,0.000037408736,0.000021933702,0.00041557374,0.000054939333,0.0000067773485,0.000032671487,0.026996026,0.000041332805,0.0000033631998,0.97180706,0.00040076088],"about_ca_topic_score_codex":0.12655741,"about_ca_topic_score_gemma":0.7075156,"teacher_disagreement_score":0.5809582,"about_ca_system_score_codex":0.0009578616,"about_ca_system_score_gemma":0.00023279787,"threshold_uncertainty_score":0.9999446},"labels":[],"label_agreement":null},{"id":"W6989721049","doi":"","title":"Canadian Solar Infrastructure Fund : Impact of the Temporary Output Curtailment by Kyushu Electric Power","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electric power; Photovoltaic system; Electricity; Electric utility; Renewable energy; Electric energy; Power (physics)","score_opus":0.003835969195222738,"score_gpt":0.1941258495350542,"score_spread":0.19028988033983146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989721049","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00051000237,0.016122244,0.0033218064,0.00004946149,0.0010709998,0.00080743944,0.00023573104,0.00027172864,0.9776106],"genre_scores_gemma":[0.4489923,0.00036655978,0.00024631634,0.0000774837,0.00012796673,0.000023951181,0.00029996823,0.0008401278,0.5490253],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986145,0.000059028967,0.0003210873,0.0002586065,0.00027980233,0.0004669776],"domain_scores_gemma":[0.9989953,0.000015239554,0.00013208565,0.00062177767,0.000043225715,0.0001923838],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000072643525,0.00040510646,0.000424168,0.00040609651,0.00003304105,0.00004140992,0.00038183463,0.0005028808,0.0060908506],"category_scores_gemma":[0.000015269545,0.00029468388,0.00020535046,0.000824275,0.000010833607,0.000037017664,0.000028717212,0.00037853295,0.000014037843],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.542096e-7,0.0000061086394,0.0024342055,0.00008395505,0.0003407197,0.0000036597023,0.00003385768,0.0038774814,0.00024408483,0.000008911835,0.9927512,0.00021520641],"study_design_scores_gemma":[0.00053346273,0.00011844957,0.0029731016,0.0005307185,0.00012025625,0.000045857847,0.000035845464,0.011692404,0.00116,0.000018906003,0.98149955,0.0012714174],"about_ca_topic_score_codex":0.07709588,"about_ca_topic_score_gemma":0.027932271,"teacher_disagreement_score":0.4484823,"about_ca_system_score_codex":0.0010019155,"about_ca_system_score_gemma":0.0008298406,"threshold_uncertainty_score":0.9999505},"labels":[],"label_agreement":null},{"id":"W6989750310","doi":"","title":"BluEarth Closes Debt Financing and Kicks Off Construction for Alberta Wind Power Project","year":2015,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Debt; Wind power; Power (physics); Government (linguistics); Boom; Project finance","score_opus":0.0065232252113359545,"score_gpt":0.20725560954097916,"score_spread":0.20073238432964322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989750310","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00014518094,0.0031389873,0.03501358,0.000011232116,0.001038929,0.0013037866,0.000042741354,0.00053778215,0.9587678],"genre_scores_gemma":[0.0055285515,0.00039974652,0.030633815,0.00003143866,0.0003293317,0.00007659697,0.00018348148,0.0009405584,0.96187645],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99919623,0.00001516365,0.00020267579,0.00024013582,0.00011212399,0.0002336867],"domain_scores_gemma":[0.99959856,0.000048506,0.00007131774,0.000192112,0.000043412758,0.00004608871],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000085776795,0.00025263368,0.00030360094,0.00025656653,0.000022976266,0.00004010348,0.00006435475,0.0003142772,0.00014356783],"category_scores_gemma":[0.000057698995,0.0002392644,0.000033247958,0.00016270926,0.00002398518,0.000069678405,0.000012879602,0.000096243515,0.000016917114],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000071352815,0.0000062812,0.000048701193,0.00027564194,0.00011005292,9.3388945e-7,0.00018971926,0.0009039184,0.000016073805,0.00039013143,0.9935851,0.004466286],"study_design_scores_gemma":[0.000614886,0.00008552063,0.000005338523,0.00025788508,0.000054880693,0.000058365644,0.00005604839,0.023326661,0.00011515876,0.000041369964,0.9749335,0.0004503561],"about_ca_topic_score_codex":0.00027023492,"about_ca_topic_score_gemma":0.0008234181,"teacher_disagreement_score":0.022422742,"about_ca_system_score_codex":0.00005856776,"about_ca_system_score_gemma":0.00008768255,"threshold_uncertainty_score":0.97569185},"labels":[],"label_agreement":null},{"id":"W6989752502","doi":"","title":"Canadian Solar Infrastructure Fund : Impact of the Temporary Output Curtailment by Kyushu Electric Power","year":2022,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electric power; Photovoltaic system; Electricity; Electric utility; Renewable energy; Electric energy; Power (physics)","score_opus":0.0031414942905701676,"score_gpt":0.18575616706005144,"score_spread":0.18261467276948126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989752502","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00045985956,0.0065656183,0.0011236446,0.00004485099,0.0009427442,0.0010052149,0.00046057717,0.0003775112,0.98902],"genre_scores_gemma":[0.43575048,0.00021307566,0.00012323282,0.000096590724,0.00009671373,0.00005575654,0.000317852,0.0010275583,0.56231874],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985526,0.00007005446,0.00031331112,0.00024926278,0.00034507446,0.00046969752],"domain_scores_gemma":[0.99902034,0.000015963426,0.00014976501,0.00062068825,0.000021558313,0.00017169947],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000098195655,0.0003924408,0.00037668482,0.000546747,0.00005712406,0.000029773919,0.0005212334,0.0003280136,0.019642957],"category_scores_gemma":[0.000011899867,0.00029147923,0.00019110041,0.00086387014,0.0000103178445,0.000045406672,0.000045374883,0.0004822109,0.000020353495],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000011015951,0.00000613907,0.003521333,0.000046127672,0.00027591552,0.000002247191,0.000044441633,0.0087233465,0.00006188067,0.0000108268205,0.9871218,0.00018481658],"study_design_scores_gemma":[0.0002686995,0.00010275316,0.0010307855,0.00005313509,0.00005725773,0.000017596076,0.000025630594,0.005463691,0.000099490746,0.00001231531,0.9922741,0.00059454434],"about_ca_topic_score_codex":0.08083523,"about_ca_topic_score_gemma":0.016523719,"teacher_disagreement_score":0.4352906,"about_ca_system_score_codex":0.0017679014,"about_ca_system_score_gemma":0.00065511186,"threshold_uncertainty_score":0.99995375},"labels":[],"label_agreement":null},{"id":"W6989753006","doi":"","title":"Canadian Solar and SkyPower Limited Enter Purchase and Joint Venture Agreement","year":2012,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Joint venture; Joint (building); Government (linguistics); Measure (data warehouse)","score_opus":0.005008284901087231,"score_gpt":0.1644821121683369,"score_spread":0.15947382726724968,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989753006","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00010816152,0.021282561,0.009761256,0.00020242906,0.0011030096,0.00076263613,0.0000684461,0.00037637277,0.9663351],"genre_scores_gemma":[0.044859737,0.0020712814,0.0021022393,0.00029980103,0.00046924083,0.000053464068,0.00020633805,0.000783323,0.94915456],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992834,0.000013596658,0.00013882206,0.00016160053,0.00009358773,0.0003090326],"domain_scores_gemma":[0.99949807,0.0000038882768,0.00003087761,0.00018596069,0.000010779619,0.0002704017],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000066067805,0.00022269248,0.00020703419,0.00035893967,0.00002003062,0.000038167047,0.000042270374,0.00026208215,0.0023108623],"category_scores_gemma":[0.0000047527055,0.00020796043,0.000021314429,0.00007464865,0.000009439141,0.000038375987,0.00001745881,0.00013682188,0.00006377413],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010863901,0.000010319237,0.00033785656,0.00026851965,0.00020268235,0.000014470893,0.00027282894,0.000044605753,0.000045065073,0.00009850102,0.9955695,0.0031345268],"study_design_scores_gemma":[0.00023682084,0.000017786595,0.00012732904,0.00013574646,0.000040753217,0.000018209614,0.000016512899,0.0019852582,0.000049255657,0.0000026781474,0.9970706,0.00029906578],"about_ca_topic_score_codex":0.011720836,"about_ca_topic_score_gemma":0.044754166,"teacher_disagreement_score":0.044751573,"about_ca_system_score_codex":0.00014031789,"about_ca_system_score_gemma":0.00002023517,"threshold_uncertainty_score":0.99860114},"labels":[],"label_agreement":null},{"id":"W6989798581","doi":"","title":"Canada Reaches Nearly 13 GW Of Installed Wind Capacity - North American Windpower","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Wind speed; Wind shear; Wind gradient; Offshore wind power","score_opus":0.004940336085799043,"score_gpt":0.1562420953481725,"score_spread":0.15130175926237344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989798581","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008331272,0.00021832532,0.0024231765,0.000013377789,0.0006347579,0.0005219628,0.00012994015,0.00034926017,0.98737794],"genre_scores_gemma":[0.47267225,0.000077100085,0.002003758,0.000059351187,0.0001449955,0.000009309019,0.00010698507,0.0008025318,0.5241237],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987825,0.000030515155,0.00031314342,0.00023828373,0.0003419843,0.00029355547],"domain_scores_gemma":[0.99912935,0.000028945064,0.00019286724,0.00052490947,0.0000403176,0.00008362131],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000048473026,0.0003166549,0.00059084786,0.00020036628,0.000010724834,0.000014651563,0.00024152029,0.00013305306,0.00034224332],"category_scores_gemma":[0.000016604612,0.00030902956,0.00005434261,0.00044221582,0.000040145096,0.000043941167,0.000020273457,0.00021233944,0.000032709373],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004571017,0.000018675004,0.004910685,0.00033228775,0.0004353333,0.000006019531,0.00012638024,0.013605001,0.000036649537,0.000032088563,0.9794087,0.0010836424],"study_design_scores_gemma":[0.00064364925,0.000117595126,0.0077648456,0.00021732519,0.00009693557,0.000009409027,0.000057118246,0.008458853,0.00023194314,0.000001005971,0.9811443,0.0012570274],"about_ca_topic_score_codex":0.8680277,"about_ca_topic_score_gemma":0.9559574,"teacher_disagreement_score":0.46434098,"about_ca_system_score_codex":0.00026994233,"about_ca_system_score_gemma":0.00036791697,"threshold_uncertainty_score":0.99993616},"labels":[],"label_agreement":null},{"id":"W6989829110","doi":"","title":"Capital Power reports third quarter 2011 results (CNW)","year":2011,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Power (physics); Capital (architecture); Capital expenditure; Work (physics)","score_opus":0.004932426071296233,"score_gpt":0.1743588522325436,"score_spread":0.16942642616124737,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6989829110","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000007770226,0.0013376542,0.010330828,0.000011048597,0.0028663704,0.00037314312,0.000021373355,0.00224025,0.98281157],"genre_scores_gemma":[0.008273542,0.00010006167,0.0019918783,0.000023616503,0.00023531138,0.000028044264,0.00009924497,0.0007222442,0.98852605],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984868,0.000022737211,0.0005196567,0.00039300937,0.00022628997,0.0003515154],"domain_scores_gemma":[0.99885947,0.000012635421,0.00017699339,0.0008185828,0.000033825374,0.00009848173],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00015354798,0.0003718817,0.00036481954,0.0003165438,0.000014590364,0.000029038136,0.00015242795,0.00054848363,0.008557602],"category_scores_gemma":[0.000015280872,0.0003421965,0.00009307027,0.000103232116,0.000014961414,0.00007106089,0.000019835223,0.0002218386,0.0029650503],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000031739776,0.000011982692,0.000013036651,0.000040890034,0.00009925201,0.000090160145,0.00022711803,0.000048267604,0.000011208432,0.000092505645,0.9993273,0.000035083387],"study_design_scores_gemma":[0.00033454152,0.00007833298,0.000080208054,0.00016820384,0.00004630573,0.00018719862,0.000030003632,0.00038442094,0.00014300604,0.000054115797,0.9976052,0.0008884549],"about_ca_topic_score_codex":0.00040143012,"about_ca_topic_score_gemma":0.00022889169,"teacher_disagreement_score":0.00833895,"about_ca_system_score_codex":0.000068170484,"about_ca_system_score_gemma":0.000025852778,"threshold_uncertainty_score":0.999903},"labels":[],"label_agreement":null},{"id":"W6990679083","doi":"","title":"Efectos Económicos para los consumidores de las nuevas tarifas de acceso a la red eléctrica en España","year":2021,"lang":"es","type":"dissertation","venue":"Zaguan (University of Zaragoza Repository)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Free access; Limiting; Quarter (Canadian coin)","score_opus":0.004335589203166421,"score_gpt":0.20112609796501202,"score_spread":0.1967905087618456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6990679083","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93929195,0.0038557986,0.018091531,0.000074150754,0.0009785033,0.0010194762,0.00007319593,0.00048071033,0.03613469],"genre_scores_gemma":[0.9851773,0.0009639652,0.004742738,0.000011948815,0.0001713,0.000005336416,0.0003800642,0.00014760175,0.008399749],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99622035,0.0009094107,0.0006336813,0.0008756805,0.00056318805,0.0007976777],"domain_scores_gemma":[0.9968238,0.00069132476,0.00083373685,0.00086716417,0.00043116935,0.00035283613],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.00045838833,0.0007140983,0.0011524968,0.00081110606,0.0004317417,0.0001890549,0.00094836793,0.001416766,0.00018891689],"category_scores_gemma":[0.00022129774,0.0010527899,0.0005489716,0.0009858281,0.00013272084,0.00045416056,0.00011302085,0.0009928095,0.000035745645],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00277088,0.0020091643,0.15041034,0.016961647,0.012759788,0.0132891815,0.06481381,0.10527707,0.5952684,0.0030594375,0.025161622,0.008218617],"study_design_scores_gemma":[0.011241935,0.0012314575,0.3819826,0.00910912,0.008930089,0.0023302084,0.019226063,0.3017888,0.23295186,0.00014402861,0.02400746,0.0070563634],"about_ca_topic_score_codex":0.0024831572,"about_ca_topic_score_gemma":0.0002776294,"teacher_disagreement_score":0.36231658,"about_ca_system_score_codex":0.001249077,"about_ca_system_score_gemma":0.0012264102,"threshold_uncertainty_score":0.9998796},"labels":[],"label_agreement":null},{"id":"W6990777461","doi":"","title":"Electric Royalties to Acquire 1.5% NSR on Canadian Lithium Deposit","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Lithium (medication); Electricity; Production (economics); Government (linguistics)","score_opus":0.004585236549683864,"score_gpt":0.1833295851337382,"score_spread":0.17874434858405433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6990777461","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000012715758,0.0037004882,0.010058581,0.00007193589,0.0010226686,0.0003893779,0.000007884778,0.0007944682,0.98394185],"genre_scores_gemma":[0.010586024,0.00016547616,0.0011781761,0.00042757986,0.0003815549,0.000065305285,0.00008605628,0.0008178257,0.986292],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99875426,0.000027634163,0.00019314927,0.00030631194,0.00020114383,0.0005175236],"domain_scores_gemma":[0.999185,0.0000184272,0.000026097665,0.00042521392,0.00003102881,0.00031421153],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00004634417,0.00032920297,0.0003226474,0.0009797584,0.000034160905,0.00007863291,0.00022093434,0.00039540438,0.0029583003],"category_scores_gemma":[0.000022809998,0.00034970843,0.000056991074,0.00080093555,0.000002957947,0.000016676437,0.000012004368,0.00018695278,0.000508015],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[7.85769e-7,0.0000044868116,0.00003509834,0.00013478761,0.00009035011,0.000032015872,0.00004058613,0.0074734064,0.00006433744,0.00024614637,0.9908006,0.001077379],"study_design_scores_gemma":[0.00012783,0.00007392668,0.0001138251,0.0005519255,0.00003255609,0.000018683124,0.000011903849,0.0113687515,0.0018624496,0.000002938079,0.98502994,0.0008053035],"about_ca_topic_score_codex":0.091044836,"about_ca_topic_score_gemma":0.37929267,"teacher_disagreement_score":0.28824782,"about_ca_system_score_codex":0.0006150458,"about_ca_system_score_gemma":0.00016270814,"threshold_uncertainty_score":0.9998955},"labels":[],"label_agreement":null},{"id":"W6992011164","doi":"","title":"Introduction Session 7: Canada and U.S. Approaches to the Evolving North American Energy Relatiosnhip in the Aftermath of the 2003 Electricity Blackout: Market Forces vs. Government Regulation","year":2005,"lang":"en","type":"article","venue":"Canada-United States law journal","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Session (web analytics); Government (linguistics); Electricity; Energy (signal processing); Energy market; Electricity market; Energy policy","score_opus":0.004831227050533522,"score_gpt":0.1476789344757915,"score_spread":0.14284770742525799,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6992011164","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9745823,0.0006116998,0.014174436,0.00862017,0.00043486373,0.0004869067,0.00005980537,0.000021845346,0.0010079351],"genre_scores_gemma":[0.9988859,0.00010058082,0.00020341678,0.00049729476,0.00017906727,0.000012043346,0.000018516059,0.0000185988,0.00008452824],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99826413,0.0003032069,0.00039587944,0.00012475702,0.0006355531,0.00027649183],"domain_scores_gemma":[0.99925816,0.0001201756,0.00022344977,0.00022518868,0.00009810738,0.00007492791],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004490983,0.000153146,0.0001547465,0.000063958396,0.0003149861,0.00006828045,0.00023946035,0.000024503908,0.00000928224],"category_scores_gemma":[0.00009399315,0.00009164061,0.000017354754,0.0014332285,0.00003521357,0.00016596136,0.000022455362,0.00029220793,4.1494808e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003084224,0.000008946589,0.009431068,0.000019387677,0.000041638243,0.0000023243972,0.00074980233,0.9235073,0.000022720475,0.00029175085,0.061477516,0.004416752],"study_design_scores_gemma":[0.00022373865,0.000040188625,0.15554859,0.000045850982,0.000035222685,0.00009966512,0.0007684421,0.760262,0.0004891737,0.000015515132,0.08226275,0.0002088265],"about_ca_topic_score_codex":0.7630553,"about_ca_topic_score_gemma":0.9971157,"teacher_disagreement_score":0.23406038,"about_ca_system_score_codex":0.0014929279,"about_ca_system_score_gemma":0.00026670942,"threshold_uncertainty_score":0.39039543},"labels":[],"label_agreement":null},{"id":"W6995501967","doi":"","title":"OPTIMAL WIND ENERGY PENETRATION MODEL FOR PAKISTAN","year":2015,"lang":"en","type":"dissertation","venue":"HEC National Digital Library","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Hydropower; Energy mix; Electricity generation; Electric power system; Renewable energy; Electricity; Market penetration; Fossil fuel; Sustainable development","score_opus":0.010964719893016305,"score_gpt":0.2344953187012434,"score_spread":0.2235305988082271,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6995501967","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009537453,0.0042938082,0.19251831,0.000080838654,0.0022034305,0.001412165,0.0081190625,0.0022786525,0.7795563],"genre_scores_gemma":[0.79621416,0.00007227958,0.0052784653,0.00006736218,0.00059995224,0.00019408166,0.13801517,0.00031764683,0.059240893],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983394,0.00000922683,0.0004896047,0.0003070962,0.000602498,0.00025214982],"domain_scores_gemma":[0.99927694,0.000092919436,0.000121531484,0.00013104606,0.0002559732,0.00012156685],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00006089071,0.00033052062,0.0002566283,0.00032118004,0.00005678767,0.00045512067,0.00021547795,0.00035805017,0.000030943407],"category_scores_gemma":[0.000051574145,0.00038478945,0.00012311347,0.0002856412,0.000009071671,0.0023526016,0.000012330048,0.0001292898,0.00002614322],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009702845,0.00004389434,0.000007492904,0.00022481922,0.00009594834,0.0000023329608,0.00012284314,0.82524097,0.000048342343,0.017171286,0.15439202,0.002553026],"study_design_scores_gemma":[0.000349052,0.000039670314,0.000021609898,0.000064505315,0.000018105278,0.000005723396,0.000026899434,0.96615416,0.0003697529,0.010398909,0.022099445,0.00045219206],"about_ca_topic_score_codex":6.37015e-7,"about_ca_topic_score_gemma":0.0000035634944,"teacher_disagreement_score":0.7866767,"about_ca_system_score_codex":0.00018750734,"about_ca_system_score_gemma":0.0005940728,"threshold_uncertainty_score":0.9998604},"labels":[],"label_agreement":null},{"id":"W6996032294","doi":"","title":"Research and Markets: Wind Power in Canada, Market Outlook to 2025 - Capacity, Generation, Market Share, Levelized Cost of Energy (LCOE), Investment Trends, Regulations and Company Profiles","year":2012,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Investment (military); Wind power; Energy (signal processing); Cost of electricity by source; Power market; Energy market; Power (physics); Renewable energy","score_opus":0.03214564481661895,"score_gpt":0.24723413266662655,"score_spread":0.21508848785000761,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996032294","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00062848115,0.004370006,0.0018109683,0.00014844732,0.00032969465,0.0008686077,0.0007247926,0.000082764825,0.99103624],"genre_scores_gemma":[0.09629248,0.0006612528,0.0048572193,0.000107301785,0.00017148297,0.00029126066,0.00045293578,0.00044889306,0.8967172],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99772036,0.0002485946,0.0005709993,0.0004133431,0.0005251511,0.0005215381],"domain_scores_gemma":[0.99892443,0.00014845116,0.00010402489,0.0004310262,0.00012570669,0.00026634868],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0006004318,0.0003663345,0.0005584767,0.0013517737,0.000053390704,0.00005421417,0.00018017173,0.0002617208,0.00970738],"category_scores_gemma":[0.000048428472,0.00037576133,0.000022204755,0.00073589344,0.000060230333,0.000105284795,0.00010205501,0.00020812631,0.0000017101519],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018391987,0.000027682336,0.0022767563,0.00018219183,0.00011177497,0.0000019642039,0.00006473028,0.00035862575,0.00009354464,0.00063653564,0.9956052,0.00062260154],"study_design_scores_gemma":[0.001957282,0.00007226967,0.06237555,0.0011497303,0.000067329,0.000023609997,0.0001632574,0.072005644,0.00064859865,0.00004618881,0.8601346,0.0013559187],"about_ca_topic_score_codex":0.25455123,"about_ca_topic_score_gemma":0.7723537,"teacher_disagreement_score":0.5178025,"about_ca_system_score_codex":0.0006959943,"about_ca_system_score_gemma":0.00033219747,"threshold_uncertainty_score":0.9998694},"labels":[],"label_agreement":null},{"id":"W6996195358","doi":"","title":"Regresso às tarifas reguladas - uma nova oportunidade para os consumidores de eletricidade","year":2018,"lang":"pt","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Nova scotia; Statistical analysis; Electrocution","score_opus":0.02349473699048245,"score_gpt":0.2581095767454087,"score_spread":0.23461483975492622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996195358","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00042595336,0.0064384225,0.18524909,0.00019919135,0.0025685998,0.00164036,0.00006440423,0.0016002547,0.8018137],"genre_scores_gemma":[0.044366997,0.0012578478,0.020162385,0.0002491515,0.0017331626,0.00010145436,0.00035493888,0.0017323121,0.93004173],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9941715,0.00028708985,0.0014701949,0.0012865682,0.00096684456,0.001817832],"domain_scores_gemma":[0.9961199,0.0002631226,0.0007834695,0.0019584126,0.00029043594,0.00058462133],"candidate_categories":["metaepi_narrow","research_integrity","insufficient_payload"],"consensus_categories":["metaepi_narrow","insufficient_payload"],"category_scores_codex":[0.0007424932,0.0014645866,0.0015176818,0.0015293324,0.0001822772,0.00030402216,0.0011711532,0.0022380282,0.045804426],"category_scores_gemma":[0.00041752803,0.001506981,0.00034798027,0.0018447366,0.00023732838,0.00022481423,0.00017523424,0.00089123833,0.006732362],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006569832,0.00016915625,0.001209365,0.0010063325,0.0014384169,0.00034441505,0.0005321584,0.0030883932,0.0008545303,0.0031169364,0.9823022,0.005872411],"study_design_scores_gemma":[0.003155014,0.00068114925,0.0010927567,0.0029274726,0.00091202575,0.00088818895,0.00023736377,0.12706287,0.0071425484,0.00017367075,0.8510819,0.0046450254],"about_ca_topic_score_codex":0.0011656457,"about_ca_topic_score_gemma":0.00065888726,"teacher_disagreement_score":0.1650867,"about_ca_system_score_codex":0.0010793502,"about_ca_system_score_gemma":0.0005291637,"threshold_uncertainty_score":0.99981034},"labels":[],"label_agreement":null},{"id":"W6996361087","doi":"","title":"RE Royalties Provides $6.3 Million Financing for a 200 Megawatt Solar Project in Alberta, Canada","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Investment (military); Work (physics); Payment","score_opus":0.006302046186512186,"score_gpt":0.20016690633054007,"score_spread":0.19386486014402787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996361087","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000019096213,0.012914396,0.022411834,0.00018188433,0.0024296795,0.0036879526,0.000094014336,0.00094146165,0.9573197],"genre_scores_gemma":[0.0035301875,0.00014782915,0.0028568383,0.000034258803,0.00019477055,0.0005312069,0.00007627082,0.00090289954,0.99172574],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988282,0.000017881503,0.00031257636,0.00031253244,0.00015881927,0.00036999345],"domain_scores_gemma":[0.9996113,0.00006370058,0.000050493385,0.0002257493,0.000020185451,0.00002855667],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010610373,0.0003137665,0.00036569487,0.00043118882,0.000014699323,0.000046604357,0.00013311963,0.0002605293,0.00009129901],"category_scores_gemma":[0.00005873804,0.0002932815,0.0000499267,0.00035265123,0.0000051403217,0.00004377426,0.00001579724,0.00017998653,0.00001872497],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002482777,0.0000031588845,0.000022770573,0.0023238831,0.000054435553,0.0000075620146,0.0001422861,0.0044510737,0.0000027522624,0.00005219482,0.9926243,0.0003131073],"study_design_scores_gemma":[0.00017839485,0.000023560084,0.0000014050745,0.0013023285,0.000030899522,0.000002647521,0.000086232794,0.09756762,0.00014857683,0.0000155257,0.90022326,0.00041955017],"about_ca_topic_score_codex":0.88071215,"about_ca_topic_score_gemma":0.9946864,"teacher_disagreement_score":0.11397427,"about_ca_system_score_codex":0.0005542925,"about_ca_system_score_gemma":0.0005322356,"threshold_uncertainty_score":0.99995196},"labels":[],"label_agreement":null},{"id":"W6996588553","doi":"","title":"Solar, Wind Projects Could Fail Under New Alberta Grid Regulations","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Grid; Power grid; Wind power; Government (linguistics)","score_opus":0.011458897421276537,"score_gpt":0.2156415007981875,"score_spread":0.20418260337691096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996588553","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[6.235973e-7,0.0026600447,0.075904325,0.00016658178,0.00199315,0.00051690557,0.000011187886,0.0014828664,0.91726434],"genre_scores_gemma":[0.0005423532,0.00009091441,0.0019994767,0.000042459455,0.00080836896,0.000014486432,0.000116919655,0.0010561144,0.9953289],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989557,0.000014674129,0.00023545044,0.00031109853,0.00020871707,0.00027432205],"domain_scores_gemma":[0.99940866,0.000026774163,0.000043307584,0.00041421497,0.00001582482,0.00009121447],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000044939585,0.00031718245,0.00026849366,0.00038859417,0.000015948379,0.00010113774,0.00015483634,0.0004594215,0.003166166],"category_scores_gemma":[0.000012911419,0.00030203548,0.000071618924,0.00046875677,0.000009771152,0.00006730681,0.000024850622,0.00024915478,0.0023868298],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[4.1092017e-7,0.0000034831394,0.0000038527123,0.00016643535,0.00017002113,0.0000019654778,0.00009447009,0.010394317,0.000012195778,0.0013001834,0.987721,0.00013162069],"study_design_scores_gemma":[0.0001592983,0.000012890996,0.000005737236,0.00035586444,0.00009602365,0.000013837764,0.000018388933,0.02430341,0.000050784292,0.00013903333,0.9743982,0.0004465608],"about_ca_topic_score_codex":0.0014708987,"about_ca_topic_score_gemma":0.0033263385,"teacher_disagreement_score":0.07806459,"about_ca_system_score_codex":0.00014190872,"about_ca_system_score_gemma":0.00011390097,"threshold_uncertainty_score":0.9999432},"labels":[],"label_agreement":null},{"id":"W6996653278","doi":"","title":"Strengthening the Power Systems Business Structure in Canada","year":2012,"lang":"de","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Business system planning; Electric power system; Organizational structure; Key (lock)","score_opus":0.0033051141829518755,"score_gpt":0.15799108952236202,"score_spread":0.15468597533941014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996653278","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028181658,0.14262299,0.041215543,0.0002297082,0.046929598,0.004022409,0.00038313703,0.0005180527,0.7612604],"genre_scores_gemma":[0.94061,0.00025867976,0.00020794077,0.000033789605,0.0005444896,0.000031660024,0.000093920346,0.0005313249,0.05768823],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9973746,0.00015684095,0.00074544316,0.0003506333,0.0005314969,0.00084099604],"domain_scores_gemma":[0.99862933,0.00015066679,0.0002681434,0.0007365384,0.00009645175,0.000118893055],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00020561213,0.00062633585,0.00064469693,0.0002641338,0.00005992128,0.000117307165,0.00054559455,0.00043219444,0.0056361123],"category_scores_gemma":[0.000055070344,0.0004489122,0.000040887408,0.001085904,0.000015533938,0.00009837611,0.000055128377,0.00064415025,0.00013718338],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000060915277,0.000012869071,0.0043752855,0.00081873464,0.00045173088,0.000029491957,0.0005244521,0.85851365,0.000045234603,0.0011220487,0.13348393,0.0006164886],"study_design_scores_gemma":[0.000660496,0.000009940996,0.0029197836,0.0015768412,0.00017043343,0.000071265364,0.00079917617,0.13855967,0.000032050488,0.0000037144985,0.85361606,0.0015805477],"about_ca_topic_score_codex":0.9135463,"about_ca_topic_score_gemma":0.93746126,"teacher_disagreement_score":0.9377918,"about_ca_system_score_codex":0.002075268,"about_ca_system_score_gemma":0.0010561203,"threshold_uncertainty_score":0.9997963},"labels":[],"label_agreement":null},{"id":"W6997413455","doi":"","title":"Wind Power in Canada, Market Outlook to 2025, 2013 Update - Capacity, Generation, Levelized Cost of Energy (LCOE), Investment Trends, Regulations and Company Profiles - kcentv.com - KCEN HD","year":2013,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Investment (military); Cost of electricity by source; Energy (signal processing); Power (physics); Renewable energy; Electricity; Electricity generation","score_opus":0.012250674312337053,"score_gpt":0.19132937314823378,"score_spread":0.17907869883589672,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6997413455","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015924955,0.0048030694,0.038237467,0.0011817156,0.0018290234,0.002543089,0.0012464622,0.00040832986,0.9481583],"genre_scores_gemma":[0.047555365,0.00067970995,0.008915942,0.0004600808,0.00017532482,0.00032456664,0.0013677069,0.00063797605,0.93988335],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99804366,0.00009890507,0.0006982968,0.00039766938,0.00036697625,0.0003944677],"domain_scores_gemma":[0.99903023,0.000030013929,0.00018864896,0.00046730446,0.000076339515,0.00020743193],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00011117112,0.0004466518,0.00065700704,0.0007678727,0.00003373447,0.00005155233,0.00020935074,0.00023639144,0.008426232],"category_scores_gemma":[0.000011946718,0.00045176045,0.000035936162,0.000446622,0.000029063844,0.00011143927,0.00005894988,0.00012973709,0.000014274091],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000030596627,0.00002097734,0.0004186181,0.000065437,0.00013145832,0.0000013584031,0.000051520507,0.01681279,0.00018383858,0.0010057277,0.9809683,0.00033688906],"study_design_scores_gemma":[0.0014047341,0.00003081754,0.003792899,0.00040000747,0.000076953664,0.0000076456645,0.000043447893,0.23777683,0.0010368582,0.000022761835,0.75423634,0.0011707286],"about_ca_topic_score_codex":0.60762835,"about_ca_topic_score_gemma":0.8610346,"teacher_disagreement_score":0.2534062,"about_ca_system_score_codex":0.0006598102,"about_ca_system_score_gemma":0.0002845124,"threshold_uncertainty_score":0.9997934},"labels":[],"label_agreement":null},{"id":"W6997440642","doi":"","title":"Wind Power in Canada, Market Outlook to 2030 Capacity, Generation, Investment Trends, Regulations and Company Profiles (Kruger Energy Inc., Invenergy LLC, Innergex Renewable Energy Inc., Capital Power Corporation)","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Renewable energy; Wind power; Investment (military); Capital (architecture); Energy (signal processing); Power (physics); Power market; Capital investment","score_opus":0.008099879278335062,"score_gpt":0.17274761656366427,"score_spread":0.16464773728532922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6997440642","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022712385,0.0020200408,0.019322783,0.00041156635,0.0032169092,0.0007666189,0.00052770483,0.0007388871,0.9707242],"genre_scores_gemma":[0.19801025,0.0002086289,0.005528217,0.0011176371,0.00065116136,0.00034355567,0.0026897278,0.0009840638,0.7904668],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9962211,0.00024955624,0.0011241923,0.0009193543,0.00070951704,0.0007762298],"domain_scores_gemma":[0.99803597,0.00005293478,0.0003515109,0.0008584415,0.00024218987,0.00045898487],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0002353308,0.0009154577,0.00089898653,0.0017905849,0.00013409408,0.00017102993,0.00037045885,0.0005852317,0.006464413],"category_scores_gemma":[0.000036967773,0.0009706903,0.00006132931,0.0012033044,0.000092749025,0.0003201315,0.00014988387,0.00017852156,0.000023512646],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008881211,0.000047485286,0.0005312454,0.000033653043,0.00018907299,0.000011354371,0.00014152842,0.04893794,0.0002561412,0.0052929074,0.9444463,0.000103458835],"study_design_scores_gemma":[0.0009000431,0.00013058216,0.00086158013,0.00022557042,0.00006115422,0.000033585286,0.00008201369,0.088104405,0.0012328671,0.00022721883,0.9063278,0.0018132252],"about_ca_topic_score_codex":0.8354484,"about_ca_topic_score_gemma":0.9863321,"teacher_disagreement_score":0.195739,"about_ca_system_score_codex":0.0016548139,"about_ca_system_score_gemma":0.00091508456,"threshold_uncertainty_score":0.9992744},"labels":[],"label_agreement":null},{"id":"W6997442506","doi":"","title":"Wind power producers are scrambling to supply Hydro-Québec","year":2023,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Scrambling; Power (physics); Production (economics); Noise (video)","score_opus":0.0070180452586402035,"score_gpt":0.20364577563741693,"score_spread":0.19662773037877673,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6997442506","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00007528689,0.00091703836,0.008464381,0.00032834974,0.0022246728,0.0010209273,0.000028464161,0.009001906,0.97793895],"genre_scores_gemma":[0.013744696,0.00006093586,0.0015542147,0.000094518764,0.00039462515,0.00004854165,0.000019068746,0.0031248701,0.9809585],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99869883,0.000014232767,0.00024375721,0.00039143057,0.0002564423,0.0003952828],"domain_scores_gemma":[0.9992746,0.000025269537,0.000057979796,0.0004890894,0.000027965772,0.00012510904],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000105389016,0.00033352227,0.00034686475,0.000628876,0.000022950098,0.000054893982,0.00023132277,0.00027313596,0.0018925931],"category_scores_gemma":[0.000070436894,0.00033919184,0.00006279619,0.00070803525,0.0000075429152,0.000050667233,0.000034086428,0.00018926784,0.0030287795],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000011961125,0.000005070601,0.00015358317,0.00009130802,0.00009816122,0.000011479029,0.00010487529,0.03003801,0.00003374173,0.000010957389,0.9690337,0.00041789748],"study_design_scores_gemma":[0.00019160405,0.000031771655,0.0001078221,0.0006694153,0.000031885844,0.0000063675093,0.000055418197,0.005875154,0.0002679912,0.0000018207136,0.99199057,0.0007702054],"about_ca_topic_score_codex":0.0025708016,"about_ca_topic_score_gemma":0.013061007,"teacher_disagreement_score":0.024162857,"about_ca_system_score_codex":0.0003296547,"about_ca_system_score_gemma":0.00006793355,"threshold_uncertainty_score":0.999906},"labels":[],"label_agreement":null},{"id":"W6997523676","doi":"","title":"Wind Power In Canada, Market Outlook To 2030, Update 2016-Capacity, Generation, Levelized Cost Of Energy (Lcoe), Investment Trends, Regulations And Company Profiles: Ken Research","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Cost of electricity by source; Investment (military); Energy (signal processing); Power (physics); Renewable energy; Electricity; Power market","score_opus":0.03645547549759486,"score_gpt":0.26038083389167355,"score_spread":0.22392535839407868,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6997523676","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00021011017,0.0015208083,0.0075669284,0.00025074134,0.00049300375,0.0008694623,0.0004659777,0.00009870744,0.98852426],"genre_scores_gemma":[0.055237457,0.00059912255,0.0044526546,0.00010818084,0.00018016307,0.000209735,0.00047213357,0.0004347094,0.93830585],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99790335,0.00017386848,0.00049750274,0.0004108372,0.0005596969,0.0004547352],"domain_scores_gemma":[0.9987033,0.000052303552,0.00015385711,0.0007407445,0.00014816182,0.00020160642],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000443288,0.0003278192,0.0005497677,0.001122686,0.00007647415,0.00006914856,0.0003362198,0.00024154132,0.0026886314],"category_scores_gemma":[0.000053093932,0.00033082254,0.000030018975,0.00035944223,0.000057721976,0.000094578354,0.00009031676,0.0002034596,0.000008004696],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006320257,0.00001575895,0.00028212718,0.00006728684,0.00009598632,0.0000028555783,0.000059961018,0.003981274,0.00018456239,0.0005914976,0.9941712,0.0005411672],"study_design_scores_gemma":[0.0010298934,0.00003291631,0.0023560082,0.0006464446,0.00002646143,0.0000061552764,0.00003017219,0.057357132,0.00082448527,0.000026365035,0.93700755,0.00065644714],"about_ca_topic_score_codex":0.47952306,"about_ca_topic_score_gemma":0.89866847,"teacher_disagreement_score":0.4191454,"about_ca_system_score_codex":0.00082722283,"about_ca_system_score_gemma":0.0006899312,"threshold_uncertainty_score":0.9999144},"labels":[],"label_agreement":null},{"id":"W6998899584","doi":"","title":"Bimbo Canada signs agreements to offset 100 per cent of its electricity consumption for Canadian operations","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Consumption (sociology); Offset (computer science); Mains electricity; Power consumption","score_opus":0.01487460656417821,"score_gpt":0.22421977769154103,"score_spread":0.2093451711273628,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6998899584","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007443358,0.005891249,0.3860982,0.00048270784,0.004027662,0.008119466,0.0039917207,0.0004512488,0.5901934],"genre_scores_gemma":[0.13420139,0.00059657963,0.009748666,0.0005532108,0.00036445155,0.00049125846,0.004768729,0.0009174646,0.8483583],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.998883,0.000025414427,0.00029877582,0.00022809296,0.00021010335,0.0003546212],"domain_scores_gemma":[0.9993376,0.000021077805,0.000037868474,0.00022788589,0.00014875266,0.00022682574],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000062225205,0.00022134592,0.00029863298,0.00041365295,0.00004426604,0.00002379398,0.0001404244,0.00017819511,0.0048425575],"category_scores_gemma":[0.00003669557,0.0002456175,0.000040765564,0.00030949575,0.000003284127,0.000022725055,0.000009205181,0.00008222598,0.00002132848],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000011747679,0.000011310868,0.00009442118,0.0003480499,0.00016982571,0.0000017791793,0.000031463187,0.0430346,0.0011245942,0.00020843584,0.954778,0.00019632824],"study_design_scores_gemma":[0.00041669115,0.00005513361,0.000118903255,0.00030983277,0.00008318922,0.0000041210074,0.000020419233,0.079455234,0.0046586357,5.789514e-7,0.91419226,0.0006849845],"about_ca_topic_score_codex":0.92126,"about_ca_topic_score_gemma":0.9992621,"teacher_disagreement_score":0.37634954,"about_ca_system_score_codex":0.0011482788,"about_ca_system_score_gemma":0.0013108952,"threshold_uncertainty_score":0.9999996},"labels":[],"label_agreement":null},{"id":"W6998953134","doi":"","title":"Canada launches Electricity Transition Hub to assist utilities","year":2022,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Mains electricity; Electricity retailing; Electricity system; Government (linguistics); Work (physics)","score_opus":0.0037542145210830696,"score_gpt":0.1583467242662776,"score_spread":0.15459250974519453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6998953134","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000014570047,0.0008903595,0.04692868,0.00010809844,0.00059150107,0.00037701652,0.00015285841,0.00094334595,0.94999355],"genre_scores_gemma":[0.032750707,0.00006125264,0.0008710228,0.00047884803,0.00023107014,0.00017094599,0.00034530798,0.00071827025,0.9643726],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989886,0.000035946116,0.00018039285,0.00020866208,0.00030985233,0.00027653654],"domain_scores_gemma":[0.9996249,0.00002525779,0.000027300686,0.0002306153,0.000014208818,0.00007770643],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00006722084,0.00022845862,0.00025687568,0.00024851633,0.000039496426,0.00002282762,0.00015679287,0.000114690825,0.012586566],"category_scores_gemma":[0.000011711347,0.0002548911,0.00003769903,0.0004450998,0.0000038791995,0.00002309539,0.00001075212,0.00017691322,0.000021262698],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013143762,0.000004246114,0.000006852221,0.00010400748,0.000056328176,0.0000048440693,0.000038870745,0.00811778,0.0000102729,0.0001298639,0.9910869,0.00043869758],"study_design_scores_gemma":[0.00007701982,0.000020319752,0.0000229385,0.00002324985,0.000021168742,0.000004582921,0.00004205584,0.0063654804,0.0001591119,0.0000045653464,0.99292725,0.00033227992],"about_ca_topic_score_codex":0.54916465,"about_ca_topic_score_gemma":0.8435907,"teacher_disagreement_score":0.294426,"about_ca_system_score_codex":0.0009147909,"about_ca_system_score_gemma":0.00027447497,"threshold_uncertainty_score":0.99999034},"labels":[],"label_agreement":null},{"id":"W6998962100","doi":"","title":"British Columbia to Proceed with $7.6 Billion Hydropower Project","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Government (linguistics); Hydroelectricity; Mains electricity","score_opus":0.0028754792255973253,"score_gpt":0.17406071061591333,"score_spread":0.171185231390316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6998962100","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00008710149,0.00018993857,0.08051207,0.0000047191775,0.00028207907,0.0014872517,0.000007840061,0.002363326,0.91506565],"genre_scores_gemma":[0.0037658287,0.0000430013,0.005731604,0.000057945545,0.00020678453,0.00018588167,0.00004837113,0.0011444623,0.98881614],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989505,0.000013800652,0.0001816986,0.0003200643,0.00023395996,0.00029998468],"domain_scores_gemma":[0.9995642,0.0000064845767,0.000049447284,0.00026208817,0.000042234602,0.00007557172],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000067533925,0.00020210842,0.0003271777,0.0001948022,0.000016028289,0.00025329154,0.0001613781,0.00025431125,0.003882414],"category_scores_gemma":[0.000011281049,0.00026161695,0.000037692535,0.0005635853,0.000008319982,0.00003779227,0.000015033237,0.00012154409,0.00027120212],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010667484,0.000009194872,0.00013297639,0.00022241707,0.00006712247,0.0000045348056,0.000015167415,0.0005997079,0.00000802529,0.0000019722245,0.99821013,0.00072771136],"study_design_scores_gemma":[0.00028882,0.00013697623,0.000058840098,0.00073115004,0.000032233413,0.000059532897,0.0000052781443,0.005559005,0.000014852007,0.0000013687683,0.9925316,0.0005803217],"about_ca_topic_score_codex":0.011603215,"about_ca_topic_score_gemma":0.07488855,"teacher_disagreement_score":0.074780464,"about_ca_system_score_codex":0.000092838956,"about_ca_system_score_gemma":0.000039254057,"threshold_uncertainty_score":0.9999836},"labels":[],"label_agreement":null},{"id":"W6999087188","doi":"","title":"Capital Power Reports First Quarter 2014 Results - Earnings News (EARNINGS) News","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Earnings; Quarter (Canadian coin); Power (physics); Capital (architecture)","score_opus":0.0030494757709702476,"score_gpt":0.17978997486426265,"score_spread":0.1767404990932924,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999087188","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00011469937,0.00063909544,0.042872045,0.00015517151,0.002756428,0.00064040924,0.000012533621,0.0029051607,0.94990444],"genre_scores_gemma":[0.024697281,0.0002421847,0.0024994924,0.00010497207,0.0008721264,0.000063658255,0.0003282702,0.0015439978,0.969648],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9969762,0.00007736892,0.0009845401,0.0008063281,0.00048154694,0.0006740027],"domain_scores_gemma":[0.9978779,0.00007672508,0.0006056003,0.0011543008,0.00006373292,0.00022171646],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00033661706,0.000700525,0.0007613132,0.00056307117,0.00006481864,0.00014107217,0.00028086605,0.0008627172,0.0054370747],"category_scores_gemma":[0.00018445919,0.0006762046,0.00019291734,0.00028652762,0.00003033288,0.00013143505,0.000048406368,0.0005818925,0.003215739],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006427051,0.000012172584,0.00052860245,0.00010717128,0.00011257972,0.000058608213,0.00039290194,0.0042286552,0.00001506299,0.00001532166,0.99441075,0.00011174605],"study_design_scores_gemma":[0.00044253084,0.000099267054,0.00022110411,0.00026429433,0.00004190955,0.000116708616,0.000046193338,0.0023928145,0.000016222599,0.000003883289,0.9955255,0.00082960335],"about_ca_topic_score_codex":0.0018975824,"about_ca_topic_score_gemma":0.00192804,"teacher_disagreement_score":0.04037255,"about_ca_system_score_codex":0.00015779099,"about_ca_system_score_gemma":0.00004431966,"threshold_uncertainty_score":0.99956894},"labels":[],"label_agreement":null},{"id":"W6999088457","doi":"","title":"Canadian Solar Subsidiary Recurrent Energy Secures Debt Financing for 20 MW California Solar Project","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Debt; Solar energy; Renewable energy; Subsidy; Government (linguistics); Energy (signal processing); Photovoltaic system","score_opus":0.0076388570341438785,"score_gpt":0.20938245515460496,"score_spread":0.20174359812046108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999088457","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00000269458,0.013578894,0.26325184,0.000054916396,0.0029573634,0.0014468128,0.0012236966,0.0010766562,0.7164071],"genre_scores_gemma":[0.0058789346,0.0039505344,0.010785464,0.00017039431,0.0022363178,0.0010617839,0.0027154915,0.002940939,0.97026014],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983307,0.0000362323,0.0002897739,0.0004120465,0.00017837038,0.00075286225],"domain_scores_gemma":[0.99894947,0.00003545531,0.0001497157,0.00061181764,0.000056742032,0.00019679566],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018383346,0.00048265696,0.0004958267,0.0006902155,0.00015622698,0.00011125227,0.00042813338,0.00062418793,0.00019315137],"category_scores_gemma":[0.0000686024,0.00048522357,0.00013813916,0.00013591463,0.000013626385,0.00007627889,0.000021984264,0.00021606899,0.000047309182],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000028871877,0.0000055457153,0.000026105692,0.0003608699,0.000121965604,0.000011526402,0.00004005254,0.0006903193,0.0000117094,0.0001225066,0.99267465,0.0059318915],"study_design_scores_gemma":[0.00022208299,0.000033075576,0.0000016396937,0.00043299727,0.00005142719,0.000010159674,0.0000045776414,0.048321836,0.0002985204,0.00002010223,0.95002323,0.0005803597],"about_ca_topic_score_codex":0.16830592,"about_ca_topic_score_gemma":0.82697207,"teacher_disagreement_score":0.65866613,"about_ca_system_score_codex":0.0006325329,"about_ca_system_score_gemma":0.000735323,"threshold_uncertainty_score":0.99976},"labels":[],"label_agreement":null},{"id":"W6999143062","doi":"","title":"Canadian Solar Won 94 MWp of Subsidy-Free Electricity Contracts in Alberta's Public Power Auction","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Power (physics); Government (linguistics); Work (physics); Electricity retailing","score_opus":0.003385146628688664,"score_gpt":0.16395020863557438,"score_spread":0.16056506200688572,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999143062","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00020217172,0.0010274637,0.0069662267,0.0001631419,0.0011220939,0.0009018709,0.0000257628,0.00027970012,0.9893116],"genre_scores_gemma":[0.49449006,0.00021112263,0.00034740183,0.00005800306,0.00010887688,0.00003418392,0.00011458422,0.0007091852,0.5039266],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99832,0.00005857529,0.00043312888,0.00030584788,0.00025341072,0.00062907167],"domain_scores_gemma":[0.9988769,0.00006192338,0.00014734226,0.0006644572,0.000066132976,0.0001832009],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00020921596,0.00034266623,0.0005422185,0.0016786058,0.000013995383,0.000041577972,0.00037995362,0.0007387945,0.0011846473],"category_scores_gemma":[0.00016167095,0.00037244,0.000073289935,0.00087319844,0.000010584604,0.00015495089,0.000015349417,0.00036407536,0.0001879079],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008686223,0.00006357531,0.0025595545,0.00033895447,0.00030891557,0.00001312036,0.00014617523,0.0053257127,0.00021968706,0.0020922518,0.9879515,0.00097184407],"study_design_scores_gemma":[0.0021474825,0.00014666248,0.0014447282,0.00043231374,0.00006899956,0.00003327166,0.000024482633,0.03959783,0.0011854137,0.0000695833,0.9532578,0.0015914397],"about_ca_topic_score_codex":0.504457,"about_ca_topic_score_gemma":0.8998999,"teacher_disagreement_score":0.49428788,"about_ca_system_score_codex":0.0009531428,"about_ca_system_score_gemma":0.00040051664,"threshold_uncertainty_score":0.99987274},"labels":[],"label_agreement":null},{"id":"W6999184264","doi":"","title":"Canada's electricity grid will need substantial changes to help achieve net zero: report","year":2022,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Grid; Power grid; Mains electricity; Production (economics); Work (physics)","score_opus":0.004677208254388867,"score_gpt":0.18285478518858714,"score_spread":0.17817757693419828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999184264","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000054875873,0.0015654513,0.050362725,0.00071007863,0.005160948,0.0014793478,0.00029255936,0.0021414799,0.93823254],"genre_scores_gemma":[0.0063154646,0.00028996298,0.001253625,0.0007910379,0.0015099038,0.00024489776,0.0011704769,0.0016009108,0.98682374],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9978557,0.000054727447,0.00036885944,0.00047140103,0.0006336579,0.0006156077],"domain_scores_gemma":[0.99898463,0.000030183679,0.00014584795,0.00060710695,0.000039748247,0.00019245737],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00017763289,0.000454151,0.0005385101,0.00050361635,0.00005942524,0.000040186096,0.00036451605,0.00024234512,0.005078934],"category_scores_gemma":[0.00004680599,0.00049474154,0.00005466403,0.0011089027,0.0000058670275,0.000035531335,0.00006555678,0.00037071592,0.000019098794],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006457081,0.0000075442836,0.000044332883,0.00006481605,0.00012596599,0.0002235081,0.00001836502,0.005896207,0.00009840907,0.000052481577,0.9930976,0.00036428732],"study_design_scores_gemma":[0.00014797068,0.00006592325,0.00001951614,0.000026914828,0.00003780598,0.00012618281,0.000009199996,0.0022713905,0.00031699147,0.000002118039,0.9963801,0.0005958702],"about_ca_topic_score_codex":0.56470793,"about_ca_topic_score_gemma":0.8877855,"teacher_disagreement_score":0.32307756,"about_ca_system_score_codex":0.0010512334,"about_ca_system_score_gemma":0.00044063927,"threshold_uncertainty_score":0.99975044},"labels":[],"label_agreement":null},{"id":"W6999217740","doi":"","title":"Capital Power places 202 MW order with Vestas from auction in Canada","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Order (exchange); Power (physics); Capital (architecture); Work (physics); Government (linguistics)","score_opus":0.0013823714553315017,"score_gpt":0.1353820389855884,"score_spread":0.1339996675302569,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999217740","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022196798,0.0008722371,0.01844669,0.000018106293,0.0016606428,0.0003640066,0.000048218262,0.00041365167,0.9759568],"genre_scores_gemma":[0.076042905,0.00014253557,0.005750127,0.000048567348,0.0004631528,0.000057941783,0.00034375978,0.001136675,0.9160143],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992213,0.000015910164,0.000152009,0.00020753164,0.00019435046,0.0002088502],"domain_scores_gemma":[0.99965954,0.000015809052,0.00004639885,0.00020966104,0.000022961269,0.00004563581],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00002385169,0.0002213482,0.00021619652,0.00015756277,0.000008628222,0.000020090558,0.00010145394,0.00015251312,0.008368079],"category_scores_gemma":[0.0000055366377,0.00019477698,0.0000087257995,0.00026631256,0.000009401099,0.000050886567,0.000008326151,0.00011002894,0.00013118784],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000046941045,0.0000047509893,0.00065713155,0.000028752771,0.000099979654,0.000015704953,0.00008374301,0.010711146,0.000007231234,0.000009493281,0.98831487,0.000062524865],"study_design_scores_gemma":[0.0014948046,0.00013173254,0.0014322853,0.000797679,0.0000752563,0.000023806624,0.00059379713,0.039771818,0.00023332147,0.000013036975,0.953592,0.001840454],"about_ca_topic_score_codex":0.92171067,"about_ca_topic_score_gemma":0.9933338,"teacher_disagreement_score":0.07382322,"about_ca_system_score_codex":0.0005755433,"about_ca_system_score_gemma":0.00035353875,"threshold_uncertainty_score":0.9925384},"labels":[],"label_agreement":null},{"id":"W6999919734","doi":"","title":"5 Effective Strategies for Managing Rising Electricity Costs in Canada","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Mains electricity; Government (linguistics); Production (economics); Electricity retailing","score_opus":0.002969404557898509,"score_gpt":0.19575468518004688,"score_spread":0.19278528062214836,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999919734","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000014710823,0.004640024,0.17572236,0.000008291924,0.0007950788,0.0009895053,0.000016781469,0.000523354,0.8172899],"genre_scores_gemma":[0.6931052,0.00047106147,0.004124005,0.000084595384,0.0006134384,0.00093574997,0.00011119072,0.0032870218,0.2972677],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991471,0.000019505977,0.00017277394,0.00022636111,0.00011589835,0.0003183286],"domain_scores_gemma":[0.99973077,0.00006732717,0.0000306521,0.00012790547,0.000011923773,0.000031403226],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008597279,0.00023111074,0.0002799272,0.0003892056,0.000008353682,0.00006182158,0.000095938856,0.00012030042,0.000054218046],"category_scores_gemma":[0.000009136412,0.0002395212,0.000030438005,0.00041836136,0.0000028805873,0.000034476154,0.0000090711565,0.00018828393,0.0000156892],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000038728226,0.0000031326592,0.000033496468,0.0019499215,0.00021701306,0.00003308717,0.000051954055,0.03744173,0.000031512325,0.0030986858,0.94864666,0.008488923],"study_design_scores_gemma":[0.0007051518,0.00005313511,0.000044073604,0.002391751,0.00012309635,0.000013977949,0.0003243464,0.8983401,0.00053528417,0.0017654449,0.094265774,0.0014378788],"about_ca_topic_score_codex":0.8084144,"about_ca_topic_score_gemma":0.9772923,"teacher_disagreement_score":0.8608984,"about_ca_system_score_codex":0.002499964,"about_ca_system_score_gemma":0.00031969987,"threshold_uncertainty_score":0.97673917},"labels":[],"label_agreement":null},{"id":"W7000247172","doi":"","title":"Expansión de las Redes de Transmisión Eléctrica en Norteamérica: Teoría y Aplicaciones","year":2010,"lang":"en","type":"other","venue":"Munich Personal RePEc Archive (Ludwig Maximilian University of Munich)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Network topology; Electric power; Transmission network; Transmission (telecommunications); Electric power transmission; Topology (electrical circuits); Variable (mathematics); Electrical network; Grid","score_opus":0.0033182047826573998,"score_gpt":0.16939095775578045,"score_spread":0.16607275297312304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7000247172","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005065298,0.0038251039,0.06846891,0.0003469126,0.00038816885,0.0012437729,0.0009038734,0.0018334042,0.9179246],"genre_scores_gemma":[0.22124423,0.026637895,0.1718794,0.00016993756,0.0009799568,0.000024742925,0.0011879768,0.002843198,0.57503265],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9971212,0.00036780353,0.00039887347,0.0006783426,0.00053923746,0.0008945132],"domain_scores_gemma":[0.99774665,0.00033408453,0.000277161,0.0011358114,0.00008709146,0.00041919306],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00034574856,0.0006903025,0.0009218338,0.00096014014,0.00022660509,0.00002805267,0.0015973409,0.00088337436,0.0010853943],"category_scores_gemma":[0.00009507662,0.00088023476,0.00045814557,0.0005584657,0.00034744164,0.00012829683,0.0001971284,0.0014368752,0.00006145233],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00086659467,0.001341094,0.0026570726,0.0053082937,0.0055084294,0.0013866107,0.079764694,0.007891989,0.03650983,0.0033520188,0.77709687,0.07831648],"study_design_scores_gemma":[0.0018812944,0.000247586,0.0019864205,0.0010433306,0.0005727028,0.0002149755,0.0027802307,0.042943574,0.0003337729,0.00027686614,0.94605327,0.0016659701],"about_ca_topic_score_codex":0.0029951322,"about_ca_topic_score_gemma":0.005630051,"teacher_disagreement_score":0.34289187,"about_ca_system_score_codex":0.00044704264,"about_ca_system_score_gemma":0.0003604366,"threshold_uncertainty_score":0.99982774},"labels":[],"label_agreement":null},{"id":"W7000805669","doi":"","title":"High Voltage Capacitor Market: Powering the Future | North America Dominate by United States, Canada","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"High voltage; Capacitor; Power (physics); Voltage","score_opus":0.0011551527055958315,"score_gpt":0.14493157468315265,"score_spread":0.14377642197755683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7000805669","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000076749624,0.02747287,0.058958758,0.0005761632,0.016997226,0.0014533879,0.0035003973,0.003576777,0.8873877],"genre_scores_gemma":[0.0016271782,0.0019187809,0.00025175954,0.00026818388,0.0008002426,0.00006097767,0.001307437,0.0012560342,0.9925094],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99861205,0.000039358045,0.00027978374,0.00030760717,0.0003276993,0.00043351925],"domain_scores_gemma":[0.9992677,0.000040992774,0.00008421793,0.00047394057,0.000029641378,0.00010349737],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000058880905,0.0004645554,0.00035243997,0.00024127796,0.00003709171,0.00008767972,0.000351345,0.00019249898,0.0022130096],"category_scores_gemma":[0.0000062860477,0.00034035172,0.000048260405,0.00093159423,0.000023046852,0.000030823663,0.000034638782,0.00046478986,0.00008716751],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019915883,0.0000025344161,0.0000026621553,0.0002370035,0.00023647462,0.000029468962,0.000063355175,0.0039819353,0.0000060527805,0.0000126414225,0.9945913,0.0008345688],"study_design_scores_gemma":[0.00009257498,0.00000895845,0.000002235689,0.00009370671,0.000048059363,0.000005173092,0.00012757102,0.026355553,0.000015687905,0.0000014590771,0.97284895,0.00040004918],"about_ca_topic_score_codex":0.51223457,"about_ca_topic_score_gemma":0.6419644,"teacher_disagreement_score":0.12972985,"about_ca_system_score_codex":0.00045045442,"about_ca_system_score_gemma":0.00009576931,"threshold_uncertainty_score":0.9999049},"labels":[],"label_agreement":null},{"id":"W7000977397","doi":"","title":"Hydro Ottawa Applauds Oxford Properties for Investing in Efficiency (CCN)","year":2012,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Work (physics); Productivity; Investment (military)","score_opus":0.013158817815914405,"score_gpt":0.19512937048826418,"score_spread":0.18197055267234977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7000977397","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000040844596,0.0033810437,0.13059865,0.0000073474894,0.00054234563,0.0010264175,0.0000049281225,0.0010121102,0.86338633],"genre_scores_gemma":[0.06290574,0.00011787393,0.019145774,0.00004711425,0.00065078266,0.00070401514,0.000060614635,0.0014693293,0.91489875],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989406,0.0000162803,0.00030735633,0.00019059828,0.00012249326,0.00042265502],"domain_scores_gemma":[0.9996263,0.000027595128,0.00006725155,0.0002108435,0.000013154549,0.000054857435],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019323213,0.00026375783,0.00029987792,0.0003799584,0.000017896251,0.000025078163,0.00017498092,0.0002864539,0.00018961135],"category_scores_gemma":[0.000046876223,0.00023256632,0.00004125118,0.0002877368,0.000014151464,0.00006646154,0.00001638423,0.0001348299,0.00004148574],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008220369,0.00012046915,0.0013148951,0.0061780317,0.00016801032,0.0000032839453,0.0007808172,0.08536275,0.0013299246,0.002508939,0.8904727,0.011751943],"study_design_scores_gemma":[0.00040475876,0.00003163719,0.000006190245,0.00054706103,0.000022621947,0.000005930093,0.000017863273,0.241233,0.00091184495,0.0000113135375,0.7561997,0.0006080276],"about_ca_topic_score_codex":0.00011162099,"about_ca_topic_score_gemma":0.0003041914,"teacher_disagreement_score":0.15587026,"about_ca_system_score_codex":0.000110832465,"about_ca_system_score_gemma":0.00002592111,"threshold_uncertainty_score":0.9483779},"labels":[],"label_agreement":null},{"id":"W7001134191","doi":"","title":"Hydro's second quarter 2024 results: Solid upstream results, mixed markets","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Upstream (networking); Work (physics); Consumption (sociology)","score_opus":0.004542855949835539,"score_gpt":0.2045613793987684,"score_spread":0.20001852344893287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7001134191","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000002106567,0.0036761854,0.002599192,0.00010639204,0.005224192,0.000503872,0.0010003668,0.0028944777,0.98399323],"genre_scores_gemma":[0.0022680066,0.00027801274,0.0011253863,0.00003173145,0.0008104733,0.000054486893,0.00045557664,0.0013319668,0.99364436],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99762374,0.00006645021,0.00078878267,0.00069155317,0.000306898,0.00052257156],"domain_scores_gemma":[0.9987413,0.00007223011,0.00012374527,0.00090170355,0.000027573637,0.00013343034],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0003360379,0.0005972827,0.0005496329,0.0006680466,0.000017354148,0.0001512421,0.00031427765,0.00071001105,0.005572022],"category_scores_gemma":[0.000047700007,0.000550405,0.00015376112,0.0004868889,0.000021307056,0.00007089839,0.000043760494,0.00048726835,0.006025307],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026172806,0.0000121132825,2.5290512e-7,0.0004961372,0.00034343026,0.000044493096,0.00009242273,0.00031130644,0.000018781522,0.00003707792,0.998081,0.00053677155],"study_design_scores_gemma":[0.00068476883,0.00004091733,0.0000018734954,0.00072853453,0.00007802196,0.000028156213,0.000032451593,0.017203499,0.00033173774,0.00004001276,0.98018783,0.0006422001],"about_ca_topic_score_codex":0.000054256154,"about_ca_topic_score_gemma":0.0005772168,"teacher_disagreement_score":0.017893214,"about_ca_system_score_codex":0.00017787758,"about_ca_system_score_gemma":0.00004008046,"threshold_uncertainty_score":0.99969476},"labels":[],"label_agreement":null},{"id":"W7002416728","doi":"","title":"900 MW Cascade Power Project in Alberta Closes Financing and Commences Construction","year":2020,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Cascade; Work (physics); Government (linguistics); Agency (philosophy)","score_opus":0.005640170142418832,"score_gpt":0.19981037700325222,"score_spread":0.1941702068608334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7002416728","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00017898947,0.002250904,0.0074746464,0.00010821726,0.00059483206,0.00062458793,0.000008619811,0.00044923084,0.98831],"genre_scores_gemma":[0.32519963,0.005882104,0.054208443,0.0004990834,0.00063151424,0.000303581,0.00018903849,0.0022618722,0.6108247],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999302,0.000028014118,0.00020273561,0.00020847472,0.00008895234,0.00016981903],"domain_scores_gemma":[0.9997557,0.000051172658,0.00005267841,0.00010876434,0.000004695024,0.00002700465],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004044829,0.00020349184,0.00027708962,0.00025200256,0.0000130406615,0.00003139376,0.000072728915,0.00022081703,0.00018809982],"category_scores_gemma":[0.000027871292,0.00019581287,0.000019656609,0.00029721516,0.000020809248,0.000058744154,0.000017944041,0.00016770253,0.000015273832],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008031044,0.000015724081,0.002160158,0.0009385717,0.00014519237,0.000024982748,0.0016001672,0.002749527,0.00005986505,0.0011575192,0.98492527,0.0062149954],"study_design_scores_gemma":[0.00085220207,0.000107747415,0.00014406904,0.0011971629,0.000046594585,0.00013611543,0.00027881825,0.09476083,0.0004836967,0.000040320298,0.90086216,0.0010903144],"about_ca_topic_score_codex":0.0033473745,"about_ca_topic_score_gemma":0.0035924867,"teacher_disagreement_score":0.37748525,"about_ca_system_score_codex":0.000054028053,"about_ca_system_score_gemma":0.000030391911,"threshold_uncertainty_score":0.79850173},"labels":[],"label_agreement":null},{"id":"W7006570234","doi":"","title":"US$1.6 billion Northern Pass transmission line will deliver Canadian hydropower to the U.S.","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Line (geometry); Government (linguistics); Mains electricity; Electricity","score_opus":0.0036142116610798835,"score_gpt":0.17846897007408025,"score_spread":0.17485475841300036,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7006570234","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000051411058,0.0009649209,0.19758208,0.00052514154,0.0012001208,0.00086722255,0.000045251913,0.0007470527,0.7980168],"genre_scores_gemma":[0.01746868,0.0004845513,0.0020287498,0.00056420715,0.0011601539,0.00005626638,0.00018352897,0.0013778665,0.976676],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987575,0.000035140343,0.00023671692,0.00029189573,0.00024079034,0.000437951],"domain_scores_gemma":[0.9990744,0.000012256831,0.000038194587,0.0005030242,0.00006100425,0.0003110974],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000113217735,0.00034395477,0.0002471938,0.00046685335,0.000062071595,0.000043323224,0.00035357248,0.00039201145,0.007318931],"category_scores_gemma":[0.000007814899,0.00023168912,0.0000708781,0.00049502705,0.000016036323,0.00004718301,0.000012318373,0.00015742428,0.0025377173],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000020040354,0.0000055056753,0.00006096953,0.00003935647,0.000058295875,0.0000062298927,0.0001121067,0.013651723,0.000026616148,0.000008582673,0.9802116,0.0058169924],"study_design_scores_gemma":[0.00009725448,0.00003636056,0.00001941678,0.0001462924,0.000026854941,0.0000053368194,0.0000040007308,0.03305812,0.0000768278,0.0000019648876,0.96619326,0.00033429588],"about_ca_topic_score_codex":0.08546566,"about_ca_topic_score_gemma":0.6701422,"teacher_disagreement_score":0.5846765,"about_ca_system_score_codex":0.0003138914,"about_ca_system_score_gemma":0.00008479348,"threshold_uncertainty_score":0.9982389},"labels":[],"label_agreement":null},{"id":"W7007831611","doi":"","title":"ABB Ltd. (ABB) to Upgrade Hydro-Quebec's Transmission Grid","year":2016,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transmission (telecommunications); Upgrade; Grid; Noise (video)","score_opus":0.003258601084799837,"score_gpt":0.198061224656112,"score_spread":0.19480262357131217,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7007831611","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000014767201,0.00074202986,0.35784748,0.00014947551,0.000879098,0.00040451737,0.000015598558,0.001560413,0.6383999],"genre_scores_gemma":[0.00041246176,0.0004228064,0.004760175,0.000079577054,0.0007285974,0.000051448504,0.00004105768,0.0009161842,0.9925877],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99869114,0.000027990527,0.00028788927,0.0003326975,0.00025724142,0.00040302105],"domain_scores_gemma":[0.99928755,0.000023871846,0.000045715602,0.00042101034,0.000015307569,0.00020657676],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000073284304,0.00039174044,0.00037717048,0.0004585518,0.000020928172,0.00003569085,0.00027972544,0.00043311092,0.008588538],"category_scores_gemma":[0.000006426628,0.0003063948,0.00009407103,0.00024291596,0.000008504977,0.000057982506,0.000014726161,0.00014740502,0.0026518242],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001583987,0.00000766747,0.000003385643,0.0001338456,0.00005685671,0.0000046774358,0.000042241125,0.000830319,0.0009705417,0.00010353035,0.98860437,0.009240983],"study_design_scores_gemma":[0.00023666999,0.000018408193,0.0000057408406,0.0004522688,0.000021685886,0.000006186689,0.0000017683236,0.0020336348,0.0019375569,0.0000073660044,0.9948122,0.00046651007],"about_ca_topic_score_codex":0.00067674136,"about_ca_topic_score_gemma":0.000574893,"teacher_disagreement_score":0.3541878,"about_ca_system_score_codex":0.00019913148,"about_ca_system_score_gemma":0.00003575119,"threshold_uncertainty_score":0.9999388},"labels":[],"label_agreement":null},{"id":"W7008085579","doi":"","title":"Allianz Global Investors Closes First Infrastructure Debt Renewable Energy Project in the US with a $400 Million Investment in Grande Prairie Wind","year":2016,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Renewable energy; Investment (military); Debt; Wind power; Government (linguistics); Boom","score_opus":0.00468861833421283,"score_gpt":0.1985817634844606,"score_spread":0.19389314515024778,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008085579","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000527223,0.0021480762,0.009456294,0.000088743735,0.00033562284,0.0013637452,0.000036804824,0.0004291779,0.9856143],"genre_scores_gemma":[0.21687981,0.007999726,0.03410678,0.0045180204,0.0019230945,0.0027609987,0.00092419516,0.00439807,0.7264893],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983339,0.00012162786,0.0003640937,0.0003927679,0.00032195967,0.00046567296],"domain_scores_gemma":[0.99930835,0.000032693988,0.00012949985,0.00045223764,0.00001839013,0.00005884164],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013002774,0.0005037919,0.00042276387,0.00041722294,0.000026463935,0.00004697845,0.00037889925,0.00045780482,0.00013567552],"category_scores_gemma":[0.000015834763,0.00029777954,0.00004504545,0.0009666505,0.000054384054,0.00010694548,0.000026468542,0.00016893755,0.000008450502],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042553136,0.000048732567,0.01053607,0.000259157,0.00014733292,0.00005246977,0.0004503552,0.054352023,0.0000063226703,0.0010435615,0.9328281,0.000233301],"study_design_scores_gemma":[0.0022301392,0.00021305622,0.0023388914,0.0016794148,0.00005720531,0.000067269284,0.00007455688,0.0030901015,0.000116106174,0.0008075794,0.9882817,0.0010439787],"about_ca_topic_score_codex":0.022876661,"about_ca_topic_score_gemma":0.24950206,"teacher_disagreement_score":0.25912502,"about_ca_system_score_codex":0.00053459004,"about_ca_system_score_gemma":0.00021776411,"threshold_uncertainty_score":0.9999474},"labels":[],"label_agreement":null},{"id":"W7008357816","doi":"","title":"The Canada Data Center Colocation Market to Soar with $1.85 Billion Investment by 2029, Adding Over 960 MW Power Capacity – Arizton","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Soar; Investment (military); Power (physics); Center (category theory); Data center; Power market","score_opus":0.006602252305307879,"score_gpt":0.18488882555523858,"score_spread":0.1782865732499307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008357816","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00003176213,0.0017375157,0.012161015,0.000400346,0.0023856475,0.0014786347,0.0011565927,0.0005599062,0.9800886],"genre_scores_gemma":[0.0066563436,0.000259857,0.0016736911,0.00078915246,0.00020805695,0.0001697227,0.0012990811,0.0009995735,0.98794454],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982892,0.000056247547,0.00028544612,0.00050565175,0.00047355046,0.00038985058],"domain_scores_gemma":[0.99868673,0.00004327123,0.00008040345,0.001021577,0.000033421853,0.0001345797],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00023078074,0.0003772039,0.00025049437,0.00015728273,0.00005287958,0.00017773939,0.0004838573,0.00018306712,0.0011076813],"category_scores_gemma":[0.000024927622,0.0002582126,0.000020395424,0.00045183432,0.000021739934,0.00009471471,0.00011113536,0.00024538412,0.00007375764],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000064556048,0.000008140426,0.000021955471,0.000103945364,0.00020573124,0.0000033855447,0.00002497528,0.0004497941,0.000020739522,0.00013172597,0.99893147,0.0000917093],"study_design_scores_gemma":[0.00014137056,0.00002813976,0.00001226929,0.00033073465,0.000043461132,0.000005578629,0.00002339686,0.01656136,0.00006137065,0.000003541818,0.98243755,0.00035125038],"about_ca_topic_score_codex":0.13577728,"about_ca_topic_score_gemma":0.5604387,"teacher_disagreement_score":0.4246614,"about_ca_system_score_codex":0.00091924955,"about_ca_system_score_gemma":0.00019567512,"threshold_uncertainty_score":0.999987},"labels":[],"label_agreement":null},{"id":"W7008372160","doi":"","title":"Canada Invests Over $960-Million in Renewable Energy and Grid Modernization Projects","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Modernization theory; Renewable energy; Grid; Energy (signal processing); Government (linguistics); Power grid","score_opus":0.005220698144050021,"score_gpt":0.1666185869522394,"score_spread":0.1613978888081894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008372160","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000063946834,0.0067211683,0.052005436,0.000021948345,0.0009995371,0.00029769287,0.000018768254,0.00032254582,0.93954897],"genre_scores_gemma":[0.016983626,0.0021760287,0.0015901723,0.0002067333,0.00036482027,0.000068261186,0.0007176291,0.00074514584,0.9771476],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991904,0.000030523122,0.00018063582,0.00023355438,0.0001700031,0.00019492023],"domain_scores_gemma":[0.999699,0.000011306312,0.000044140987,0.00017669072,0.000018193023,0.000050664486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003502406,0.00019908934,0.00022839048,0.0002664336,0.000010134708,0.000027525766,0.000058792237,0.00022067342,0.0003176628],"category_scores_gemma":[0.00001410416,0.00021445457,0.000010021683,0.00041734386,0.000004479067,0.00004065294,0.000019512956,0.000062534105,3.433578e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.736361e-7,0.0000039872366,0.00026922717,0.00021902857,0.000023911507,0.000013691148,0.000015702653,0.11339546,0.00008540817,0.00006856771,0.88576525,0.00013921464],"study_design_scores_gemma":[0.00035480296,0.00000891932,0.00009446153,0.0005211211,0.000012194342,0.000011081646,0.000008739671,0.53088224,0.000919458,0.000016770207,0.4666586,0.00051162],"about_ca_topic_score_codex":0.89218795,"about_ca_topic_score_gemma":0.9903606,"teacher_disagreement_score":0.41910666,"about_ca_system_score_codex":0.00030283118,"about_ca_system_score_gemma":0.0003341283,"threshold_uncertainty_score":0.87452036},"labels":[],"label_agreement":null},{"id":"W7008387150","doi":"","title":"Canadian Solar Secures US$50 Million Long-Term Financing for a 100.1 MWp Solar Power Project in Argentina","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Solar energy; Solar power; Renewable energy; Power (physics); Work (physics)","score_opus":0.007745156481251537,"score_gpt":0.2202003556546295,"score_spread":0.21245519917337796,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008387150","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025107246,0.006019619,0.2436359,0.000050730738,0.004578687,0.007160671,0.0002529197,0.001630255,0.7341605],"genre_scores_gemma":[0.0649821,0.0007546845,0.013930034,0.00019299886,0.0013002048,0.0009223967,0.0009884741,0.0034331328,0.91349596],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.998064,0.00003820539,0.00041270177,0.0004632918,0.00018482555,0.0008370224],"domain_scores_gemma":[0.99925256,0.00002365926,0.00011029906,0.00042514436,0.000056715468,0.0001316297],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0002559647,0.00047072975,0.0004808726,0.0014877213,0.00005691227,0.00007890624,0.0002904541,0.0006513804,0.0011093353],"category_scores_gemma":[0.000047115143,0.00048778937,0.000117760756,0.0004888892,0.000014238778,0.0000990626,0.000021653323,0.00020594939,0.00014834541],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008631398,0.000024774328,0.005430487,0.0009683403,0.00015050323,0.00003544213,0.00028823025,0.00042003414,0.000073431045,0.000040692958,0.99213177,0.00042767983],"study_design_scores_gemma":[0.0010281652,0.00018094541,0.0012870119,0.0017565022,0.000078632525,0.000037496888,0.00002141497,0.02381613,0.0007308619,0.000011485371,0.9694648,0.0015865923],"about_ca_topic_score_codex":0.048663672,"about_ca_topic_score_gemma":0.58008915,"teacher_disagreement_score":0.53142554,"about_ca_system_score_codex":0.00070621766,"about_ca_system_score_gemma":0.0003772576,"threshold_uncertainty_score":0.9998038},"labels":[],"label_agreement":null},{"id":"W7008465772","doi":"","title":"Canada Invests Over $960-Million in Renewable Energy and Grid Modernization Projects","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Modernization theory; Renewable energy; Grid; Energy (signal processing); Government (linguistics); Power grid","score_opus":0.005220698144050021,"score_gpt":0.1666185869522394,"score_spread":0.1613978888081894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008465772","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000063946834,0.0067211683,0.052005436,0.000021948345,0.0009995371,0.00029769287,0.000018768254,0.00032254582,0.93954897],"genre_scores_gemma":[0.016983626,0.0021760287,0.0015901723,0.0002067333,0.00036482027,0.000068261186,0.0007176291,0.00074514584,0.9771476],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991904,0.000030523122,0.00018063582,0.00023355438,0.0001700031,0.00019492023],"domain_scores_gemma":[0.999699,0.000011306312,0.000044140987,0.00017669072,0.000018193023,0.000050664486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003502406,0.00019908934,0.00022839048,0.0002664336,0.000010134708,0.000027525766,0.000058792237,0.00022067342,0.0003176628],"category_scores_gemma":[0.00001410416,0.00021445457,0.000010021683,0.00041734386,0.000004479067,0.00004065294,0.000019512956,0.000062534105,3.433578e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.736361e-7,0.0000039872366,0.00026922717,0.00021902857,0.000023911507,0.000013691148,0.000015702653,0.11339546,0.00008540817,0.00006856771,0.88576525,0.00013921464],"study_design_scores_gemma":[0.00035480296,0.00000891932,0.00009446153,0.0005211211,0.000012194342,0.000011081646,0.000008739671,0.53088224,0.000919458,0.000016770207,0.4666586,0.00051162],"about_ca_topic_score_codex":0.89218795,"about_ca_topic_score_gemma":0.9903606,"teacher_disagreement_score":0.41910666,"about_ca_system_score_codex":0.00030283118,"about_ca_system_score_gemma":0.0003341283,"threshold_uncertainty_score":0.87452036},"labels":[],"label_agreement":null},{"id":"W7008524638","doi":"","title":"Canadian Solar Acquires 47.5 MWp Portfolio in Chile","year":2020,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Portfolio; Government (linguistics); Work (physics); Investment (military)","score_opus":0.0029384339325885162,"score_gpt":0.16189548636855014,"score_spread":0.15895705243596162,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008524638","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000002719695,0.0014558935,0.0028523032,0.000062951294,0.00046582488,0.0002693339,0.000026210517,0.00064557017,0.9942192],"genre_scores_gemma":[0.023021854,0.0005469284,0.0018186206,0.0003258104,0.0005378547,0.000051108007,0.00025458162,0.001353558,0.9720897],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99921906,0.000012276084,0.00017790393,0.00018279847,0.00010164693,0.00030632186],"domain_scores_gemma":[0.99959177,0.000005367595,0.000026140586,0.00019810081,0.0000046583564,0.00017394232],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000036490947,0.00020458324,0.00024971997,0.0005449631,0.00000912114,0.000025489035,0.00016901892,0.00028160264,0.007193586],"category_scores_gemma":[0.000009698461,0.00022307299,0.00003229509,0.00037687572,0.000004145571,0.000031978932,0.000009635015,0.00015282608,0.00041917988],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[2.2016185e-7,0.0000017865004,0.00021302758,0.00006196497,0.00003217304,0.000040325267,0.00003543712,0.0017695808,0.0000050260687,0.00010047058,0.99723995,0.00050003355],"study_design_scores_gemma":[0.00012465376,0.000008141603,0.000101878104,0.00010702712,0.000008762839,0.0000054894103,0.0000072264334,0.015406767,0.000042363063,0.0000057968155,0.9838465,0.00033538372],"about_ca_topic_score_codex":0.1781633,"about_ca_topic_score_gemma":0.59825975,"teacher_disagreement_score":0.42009643,"about_ca_system_score_codex":0.0002729025,"about_ca_system_score_gemma":0.00013355924,"threshold_uncertainty_score":0.993714},"labels":[],"label_agreement":null},{"id":"W7008586805","doi":"","title":"Canada’s Leading Renewable Energy Stock Combines Growth With High Yield","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Stock (firearms); Renewable energy; Yield (engineering); Energy consumption; Work (physics)","score_opus":0.0043814032454028585,"score_gpt":0.15138808799765152,"score_spread":0.14700668475224865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008586805","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000013916269,0.0005777832,0.075811654,0.00003559001,0.00079288945,0.00016252085,0.000013518206,0.00061182975,0.92199284],"genre_scores_gemma":[0.019540427,0.00009850374,0.0007699874,0.000081272905,0.00013898604,0.000019613237,0.000052789615,0.0006459044,0.97865254],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99902827,0.000009731506,0.00016564425,0.00023297463,0.00026098723,0.00030238763],"domain_scores_gemma":[0.9994573,0.000046421872,0.00006720906,0.00033081442,0.00003494782,0.000063325075],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000029847874,0.00029744074,0.00037321387,0.00019367712,0.000018108318,0.000029302906,0.00019571642,0.00023660835,0.0006042876],"category_scores_gemma":[0.000008274226,0.00025853535,0.00001984204,0.00021624462,0.0000059046433,0.000040466504,0.000015009362,0.00011136454,0.000021987331],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014278675,0.0000028554707,0.000050644358,0.00016754797,0.00010920423,0.0000060117704,0.000003010514,0.039183125,0.000019593946,0.0011000681,0.95933694,0.000019601917],"study_design_scores_gemma":[0.00043350895,0.00007486067,0.000007877045,0.00079577323,0.00006107145,0.000019918312,0.000008970863,0.012277089,0.0019165905,0.000014954814,0.9834253,0.00096406654],"about_ca_topic_score_codex":0.96716964,"about_ca_topic_score_gemma":0.98311645,"teacher_disagreement_score":0.07504167,"about_ca_system_score_codex":0.0002465434,"about_ca_system_score_gemma":0.00038278234,"threshold_uncertainty_score":0.9999867},"labels":[],"label_agreement":null},{"id":"W7009347679","doi":"","title":"Earnings of French utility Engie in the third quarter jump 18%","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Earnings; Quarter (Canadian coin); Jump; Term (time); Work (physics)","score_opus":0.008666308176339791,"score_gpt":0.21477034180665544,"score_spread":0.20610403363031565,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7009347679","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00002783138,0.002259661,0.012218117,0.00002400374,0.00045640857,0.00025723552,0.0000075262064,0.00039557478,0.98435366],"genre_scores_gemma":[0.16940352,0.00012704021,0.00085651857,0.000028050852,0.00017545332,0.00003993008,0.000025210149,0.0003964663,0.8289478],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992152,0.000047734753,0.00024096349,0.00016229287,0.00017573289,0.0001580638],"domain_scores_gemma":[0.9995669,0.000040030794,0.00003996007,0.00032768166,0.000010661484,0.0000147435],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0002645966,0.000168286,0.00023010772,0.0002485089,0.0000034073032,0.000019360852,0.00021065531,0.00023063822,0.0017068406],"category_scores_gemma":[0.000015917434,0.000119111486,0.000058150028,0.0003746791,0.000011904512,0.00002124982,0.000012139113,0.0003008985,0.00040039248],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[2.5166193e-7,0.0000071912295,0.0001431421,0.000388021,0.000036860776,0.0000026786913,0.0005901535,0.00020266643,0.0000063566804,0.00008132765,0.9984142,0.00012710366],"study_design_scores_gemma":[0.00021385208,0.000041551877,0.0008949721,0.00066812447,0.000060079306,0.000007402587,0.00014580935,0.049984206,0.000083476814,0.00014002813,0.94733185,0.00042867824],"about_ca_topic_score_codex":0.00048240495,"about_ca_topic_score_gemma":0.00034850417,"teacher_disagreement_score":0.16937569,"about_ca_system_score_codex":0.000030332116,"about_ca_system_score_gemma":0.000015725887,"threshold_uncertainty_score":0.9992057},"labels":[],"label_agreement":null},{"id":"W7010416249","doi":"","title":"IBM and Hydro One Partner Up to Provide Help with Ontario's Power Grid","year":2012,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"IBM; Power grid; Power (physics); Grid; Automation","score_opus":0.006663416380564474,"score_gpt":0.18138552567924437,"score_spread":0.1747221092986799,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7010416249","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0001253341,0.0007438532,0.026381785,0.000037375637,0.0007370407,0.00084237,0.0000074196987,0.000786151,0.97033864],"genre_scores_gemma":[0.0097611295,0.000021495956,0.0052705146,0.00007632214,0.0002467247,0.000086942266,0.00003027796,0.0005763824,0.98393023],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990139,0.000012798985,0.00016627625,0.00024859476,0.00019770779,0.0003607025],"domain_scores_gemma":[0.9994312,0.000011179528,0.00004324694,0.00032271832,0.000018265027,0.00017342408],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00006830635,0.0003062605,0.00032710773,0.00021077643,0.000015684876,0.000042972242,0.00009917303,0.00022121033,0.004088434],"category_scores_gemma":[0.0000041003946,0.00025442068,0.000021040423,0.00015229924,0.000010291495,0.0000777665,0.000025184187,0.0001668956,0.0002493513],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012924721,0.000021309259,0.0009735912,0.00018085336,0.00026064724,0.0000048256143,0.00055322336,0.00078280974,0.000047255933,0.00023284437,0.996311,0.0006187202],"study_design_scores_gemma":[0.000266824,0.00007457218,0.0001230837,0.00020510617,0.00005054096,0.000015563288,0.000008978402,0.00018058975,0.00019137398,0.0000015455624,0.99842405,0.00045775907],"about_ca_topic_score_codex":0.0047620395,"about_ca_topic_score_gemma":0.046622198,"teacher_disagreement_score":0.04186016,"about_ca_system_score_codex":0.00016636698,"about_ca_system_score_gemma":0.000041049574,"threshold_uncertainty_score":0.9999908},"labels":[],"label_agreement":null},{"id":"W7010809019","doi":"","title":"Is there a Bearish outlook for Power Corporation of Canada (TSE:POW) this week?","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Corporation; Power (physics); Work (physics); Government (linguistics)","score_opus":0.009437457420318393,"score_gpt":0.19890638645054376,"score_spread":0.18946892903022536,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7010809019","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000002420882,0.0013572751,0.049386933,0.00004738633,0.0009963645,0.00066807977,0.00017907534,0.0002027933,0.94715965],"genre_scores_gemma":[0.009055469,0.000084030056,0.0014117254,0.00003058939,0.00011055148,0.000048074016,0.00007299885,0.00040362007,0.98878294],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99911374,0.000011258201,0.00023586274,0.00019481746,0.00022675395,0.00021757346],"domain_scores_gemma":[0.9990576,0.000024482046,0.0002723883,0.0005110872,0.00008300774,0.000051428753],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00008895387,0.00023706206,0.00036357556,0.000115009076,0.00003591196,0.00003198306,0.0002488771,0.00031591763,0.0062062056],"category_scores_gemma":[0.000028700604,0.00022994146,0.00006604013,0.00006112761,0.000012466561,0.000055335742,0.000013354394,0.00009754587,0.000013742817],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000021871206,0.000007917212,0.00003026596,0.00021392178,0.00013454957,0.0000010042073,0.00003815162,0.00026513866,0.000016616463,0.000137613,0.9990931,0.00005949193],"study_design_scores_gemma":[0.00026014942,0.000039244595,0.000012828828,0.00020068335,0.00001741668,0.0000014319935,0.0000073903743,0.0078032315,0.00049967534,0.00001990162,0.990858,0.00028002105],"about_ca_topic_score_codex":0.059337474,"about_ca_topic_score_gemma":0.1525771,"teacher_disagreement_score":0.093239635,"about_ca_system_score_codex":0.00017132025,"about_ca_system_score_gemma":0.00031352407,"threshold_uncertainty_score":0.9947023},"labels":[],"label_agreement":null},{"id":"W7011427647","doi":"","title":"Massachusetts Gov. Charlie Baker's proposal to authorize long-term contracts between utilities and Canadian hydropower producers is being viewed by some as a potential game-changer in energy-starved New England","year":2016,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"New england; Hydropower; Payment; West virginia; Legislation","score_opus":0.005212801717346964,"score_gpt":0.20788815093670363,"score_spread":0.20267534921935665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7011427647","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027869027,0.04953529,0.081243135,0.017631117,0.013566966,0.021119988,0.004465688,0.006685156,0.77788365],"genre_scores_gemma":[0.35449857,0.0010392588,0.00040623863,0.00038805715,0.0018510649,0.00016022862,0.00045623461,0.0011703555,0.64002997],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99700433,0.00010915955,0.00055791525,0.0008062034,0.00042223642,0.001100166],"domain_scores_gemma":[0.99842703,0.000046227313,0.00012915187,0.0004797643,0.000048096677,0.0008697237],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00027145992,0.0007365349,0.00085559743,0.00092093076,0.000047932408,0.00017682329,0.0002910154,0.00071085995,0.0027155986],"category_scores_gemma":[0.000050823877,0.0006776663,0.000074186464,0.00023416849,0.000041365493,0.00026115743,0.00004738225,0.0002981428,0.00016427928],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010307892,0.000051655505,0.0039780755,0.00083367457,0.0013612628,0.00035630527,0.0026646913,0.00016579703,0.0016173477,0.00045669984,0.9544993,0.03391211],"study_design_scores_gemma":[0.0059484574,0.00037285875,0.0010840902,0.0022919273,0.00034997278,0.000048682803,0.00003779138,0.0018528806,0.003139734,0.00023289719,0.9809568,0.003683941],"about_ca_topic_score_codex":0.05981268,"about_ca_topic_score_gemma":0.08800432,"teacher_disagreement_score":0.32662955,"about_ca_system_score_codex":0.00067537493,"about_ca_system_score_gemma":0.00048322402,"threshold_uncertainty_score":0.99956745},"labels":[],"label_agreement":null},{"id":"W7014411465","doi":"","title":"Power Corporation Reports Third Quarter Financial Results","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Corporation; Quarter (Canadian coin); Power (physics); Work (physics)","score_opus":0.0045309214132858286,"score_gpt":0.1874041135939103,"score_spread":0.18287319218062448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7014411465","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000041366648,0.00013073979,0.06581074,0.000017721859,0.0032796138,0.00032059103,0.000010835546,0.0014858617,0.92893976],"genre_scores_gemma":[0.0055294298,0.000023769164,0.0027350457,0.000028630146,0.0007186737,0.000024226196,0.00021146818,0.00037549052,0.9903533],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988331,0.00001966152,0.0004390323,0.0002894306,0.00021289838,0.00020588137],"domain_scores_gemma":[0.9991928,0.000009799691,0.00020937368,0.00048992,0.000049910646,0.00004823048],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0001628394,0.00024598953,0.00024824287,0.0002361224,0.00001870281,0.000042419077,0.00008049857,0.00048002144,0.0010662368],"category_scores_gemma":[0.00005510863,0.00023683379,0.000049856975,0.00021456323,0.000014621611,0.00006878953,0.000009696934,0.00010551734,0.00095348473],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000038742414,0.000005787308,0.000010217783,0.000026218031,0.000019610225,0.00002534952,0.000037276783,0.00013468358,0.000014201799,0.00011529308,0.99957776,0.000029704328],"study_design_scores_gemma":[0.00017435908,0.00005871217,0.00002405742,0.00011814881,0.000012702094,0.00003812696,0.0000023578655,0.0021181596,0.00011672482,0.00006332101,0.99692684,0.0003465122],"about_ca_topic_score_codex":0.000030529714,"about_ca_topic_score_gemma":0.00015873415,"teacher_disagreement_score":0.06307569,"about_ca_system_score_codex":0.00007520269,"about_ca_system_score_gemma":0.000046939105,"threshold_uncertainty_score":0.99984694},"labels":[],"label_agreement":null},{"id":"W7014411625","doi":"","title":"Presidential Permit Paves Way for Minnesota Powers Great NorthernTransmission Line to Deliver Canadian Hydropower to Customers","year":2016,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Presidential system; Hydropower; Line (geometry); Government (linguistics)","score_opus":0.004670088815836373,"score_gpt":0.2149955529580797,"score_spread":0.21032546414224335,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7014411625","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00011491361,0.0006381291,0.28960666,0.0004965969,0.0023082765,0.0031429154,0.00047080225,0.0008896845,0.702332],"genre_scores_gemma":[0.014592637,0.00014987374,0.0030081712,0.00022166084,0.0005902381,0.00016492915,0.00011535408,0.001202789,0.97995436],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980913,0.000022687509,0.00034019945,0.0005083246,0.00027580818,0.0007617089],"domain_scores_gemma":[0.99855644,0.00003192539,0.00004551413,0.00046201918,0.00008287994,0.0008212304],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00009152702,0.00050534273,0.00043006978,0.0010405468,0.0000584918,0.00005578938,0.00037366556,0.0004474301,0.008448873],"category_scores_gemma":[0.000023563944,0.00042478243,0.00013817186,0.0002790024,0.000013057506,0.0000807255,0.000019085877,0.00010044176,0.0011499781],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021146827,0.0000065344025,0.000032931515,0.00014164456,0.00014323911,0.000013391431,0.00017482505,0.0061534652,0.0003701969,0.000028709437,0.98646384,0.0064500957],"study_design_scores_gemma":[0.00040818955,0.00007847009,0.000011590912,0.00033865508,0.000068110065,0.0000058339197,0.000011132107,0.0029027984,0.0005758257,0.0000014398362,0.9948985,0.00069943245],"about_ca_topic_score_codex":0.030599417,"about_ca_topic_score_gemma":0.23055671,"teacher_disagreement_score":0.2865985,"about_ca_system_score_codex":0.0005060197,"about_ca_system_score_gemma":0.00009932349,"threshold_uncertainty_score":0.9998204},"labels":[],"label_agreement":null},{"id":"W7014688947","doi":"","title":"Power Co. of Canada (POW) Earns “Sector Perform” Rating from Scotiabank","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Production (economics); Work (physics); Investment (military); Context (archaeology)","score_opus":0.004044504420698089,"score_gpt":0.1786736385721032,"score_spread":0.1746291341514051,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7014688947","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0002888684,0.0012201287,0.005398429,0.000005091715,0.0013496025,0.00025034108,0.00014735354,0.0002731022,0.9910671],"genre_scores_gemma":[0.17248523,0.00006528251,0.0016255332,0.000015902935,0.00031913354,0.000012723172,0.00012983014,0.00069598,0.8246504],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99896944,0.000018358043,0.00024435623,0.00020077682,0.00029165563,0.00027540117],"domain_scores_gemma":[0.9991042,0.00003924199,0.00019447596,0.0005549766,0.000031759326,0.00007531636],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00006999516,0.00027061612,0.00041999682,0.000120846424,0.000037957536,0.000029720575,0.00030147913,0.00023808287,0.019528788],"category_scores_gemma":[0.00004611644,0.00026474614,0.00004872457,0.00006091374,0.000014200319,0.000047512935,0.000018800592,0.00018407272,0.000027510536],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010133571,0.00000339305,0.00040074872,0.000102757935,0.0001696987,0.000004580262,0.000047149377,0.0010335512,0.00016804306,0.00001794945,0.9979693,0.0000817686],"study_design_scores_gemma":[0.00054983224,0.000035931767,0.00033212296,0.0010329065,0.000032220923,0.0000041925177,0.0000334622,0.03268808,0.0038293146,0.000002671635,0.96053976,0.0009194796],"about_ca_topic_score_codex":0.27891022,"about_ca_topic_score_gemma":0.39064124,"teacher_disagreement_score":0.17219636,"about_ca_system_score_codex":0.00018246847,"about_ca_system_score_gemma":0.00032644256,"threshold_uncertainty_score":0.99998045},"labels":[],"label_agreement":null},{"id":"W7014847120","doi":"","title":"Quebec premier pushes for long-term hydroelectric power contracts with Massachusetts","year":2015,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydroelectricity; Power (physics); Work (physics); Hydro power; Electric power industry","score_opus":0.006242133703631873,"score_gpt":0.2015604314784329,"score_spread":0.195318297774801,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7014847120","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000059293867,0.0039362977,0.16277066,0.000026236083,0.00060151983,0.0020073247,0.000051885047,0.0020456028,0.82850116],"genre_scores_gemma":[0.023232931,0.00006668263,0.0023162698,0.00004297376,0.00027652874,0.00023875694,0.00033914836,0.0014360889,0.9720506],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99841857,0.000025495263,0.00029179678,0.0003761618,0.00032556825,0.0005624252],"domain_scores_gemma":[0.9990773,0.000056238845,0.00013021339,0.00046481696,0.00010414505,0.00016727447],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014069086,0.0005030967,0.00054942316,0.00041989976,0.000020748457,0.000086244865,0.00025128684,0.00050614885,0.00066164066],"category_scores_gemma":[0.000030534873,0.00041659633,0.00006386131,0.0003769231,0.000018168126,0.00012265885,0.000011040149,0.00020495527,0.000116337666],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021243297,0.000028851313,0.00021757887,0.00023651017,0.0003643368,0.00001374987,0.000045631055,0.0012007346,0.000028958308,0.00006464159,0.99714345,0.00063432875],"study_design_scores_gemma":[0.0033355418,0.00043892625,0.00036714354,0.00082589494,0.00039017218,0.00009854844,0.000007304292,0.012787574,0.000692714,0.000015854781,0.9788886,0.0021517703],"about_ca_topic_score_codex":0.0003132705,"about_ca_topic_score_gemma":0.009759448,"teacher_disagreement_score":0.16045439,"about_ca_system_score_codex":0.0004323496,"about_ca_system_score_gemma":0.00017307131,"threshold_uncertainty_score":0.9998286},"labels":[],"label_agreement":null},{"id":"W7015447539","doi":"","title":"St[r]ategic offers in an oligopolistic electricity market under pay-as-bid pricing","year":2008,"lang":"en","type":"dissertation","venue":"eScholarship@McGill (McGill)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"","keywords":"Oligopoly; Competition (biology); Market competition; Monopoly","score_opus":0.011289101121330958,"score_gpt":0.22669275657891616,"score_spread":0.2154036554575852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7015447539","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84955347,0.0005874583,0.000018165798,0.0000038467138,0.0018888733,0.0012555938,0.00024951287,0.0011599717,0.14528312],"genre_scores_gemma":[0.99171126,0.0011778818,0.00028531594,0.00011106324,0.000084247295,0.00021295446,0.0014634142,0.0005703706,0.004383522],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99414486,0.00044401572,0.0015058299,0.0013047818,0.0010906907,0.0015098257],"domain_scores_gemma":[0.9973764,0.00031038103,0.0004543521,0.001028899,0.0003512072,0.00047875944],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["research_integrity"],"category_scores_codex":[0.00083716895,0.0012744598,0.0012659807,0.0016693327,0.00059034646,0.00013539694,0.0009115386,0.0014496119,0.00025826297],"category_scores_gemma":[0.0004491589,0.0013841396,0.0002815013,0.0024617305,0.000039750146,0.001124537,0.00005222287,0.0027310676,0.00016584159],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0034376055,0.003954239,0.0022426022,0.014661178,0.0042855497,0.0040836697,0.0006476516,0.45297384,0.14995247,0.16848499,0.0009233656,0.19435284],"study_design_scores_gemma":[0.025422726,0.0051038596,0.0621956,0.012298106,0.0038328622,0.0026914813,0.0038770759,0.31637385,0.33851847,0.14329784,0.043562897,0.04282522],"about_ca_topic_score_codex":0.00075366336,"about_ca_topic_score_gemma":0.0027796233,"teacher_disagreement_score":0.18856601,"about_ca_system_score_codex":0.0035063035,"about_ca_system_score_gemma":0.00015953672,"threshold_uncertainty_score":0.9998467},"labels":[],"label_agreement":null},{"id":"W7016171892","doi":"","title":"Wind and sun come through to help Alberta electricity operator end grid alerts","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Grid; Electricity; Operator (biology); Electricity system; Wind power","score_opus":0.006104542775420632,"score_gpt":0.21114503313544924,"score_spread":0.2050404903600286,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7016171892","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00006399668,0.00498475,0.015459346,0.00009632542,0.0014567048,0.0006728248,0.00003746633,0.0007429762,0.9764856],"genre_scores_gemma":[0.00916173,0.00041723333,0.0019465771,0.00020919944,0.0007056317,0.00003694679,0.000048527705,0.0010108371,0.9864633],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99875516,0.000023906658,0.000247218,0.0004165334,0.00019177818,0.00036541137],"domain_scores_gemma":[0.99947625,0.000040080693,0.000025900668,0.00032088984,0.000018807692,0.00011808598],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000067190726,0.0003887283,0.00041945963,0.00027976287,0.000019282477,0.000114420094,0.00016497537,0.00028539434,0.0031656935],"category_scores_gemma":[0.000017429946,0.00036168733,0.00004369735,0.00055053364,0.000011260729,0.00007368585,0.00004954786,0.00022013762,0.00071663054],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001309256,0.000007938811,0.000055029508,0.00025588222,0.0001704702,0.000008497911,0.00013196995,0.00045495198,0.000059973965,0.0005229436,0.99802256,0.00030848602],"study_design_scores_gemma":[0.00018831044,0.00005448734,0.000013506966,0.00028109917,0.000067402594,0.00003115569,0.000008171961,0.0040199575,0.0011356281,0.000028358096,0.99349564,0.0006762871],"about_ca_topic_score_codex":0.0020635172,"about_ca_topic_score_gemma":0.0009693582,"teacher_disagreement_score":0.013512769,"about_ca_system_score_codex":0.000098100645,"about_ca_system_score_gemma":0.000025631229,"threshold_uncertainty_score":0.99988353},"labels":[],"label_agreement":null},{"id":"W7016171903","doi":"","title":"Wind Power Market in Canada, Forecast to 2025 - COVID-19 Impact, Market Opportunities, Key Projects - ResearchAndMarkets.com","year":2020,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Key (lock); Wind power; Power market; Power (physics); Market power; Market research","score_opus":0.03905224989858009,"score_gpt":0.25990932164234637,"score_spread":0.2208570717437663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7016171903","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000019066052,0.00069216115,0.0038856848,0.001228851,0.0006372754,0.0024903738,0.00084800523,0.00048605274,0.98971254],"genre_scores_gemma":[0.005404006,0.000559893,0.0007571958,0.0011888671,0.00016260117,0.00015397804,0.00030037374,0.0010950563,0.990378],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9965278,0.0003196227,0.0006062646,0.00063789426,0.0008201927,0.0010882523],"domain_scores_gemma":[0.9976965,0.00025366797,0.00011283638,0.0006761993,0.000047518482,0.0012132332],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0006976988,0.00069824286,0.00082927535,0.0012453786,0.000044683573,0.00010191016,0.0006321615,0.00037831452,0.05341189],"category_scores_gemma":[0.00043781978,0.0006935036,0.00008384357,0.0012493596,0.000024569437,0.000104256476,0.00016792935,0.00058435433,0.000037912938],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":true,"study_design_scores_codex":[0.00011663984,0.000012642742,0.0005803912,0.0005927878,0.00017933888,0.00044236163,0.00015440943,0.0011044351,0.000003154827,0.000017443423,0.99640906,0.00038732187],"study_design_scores_gemma":[0.00069584453,0.00014023457,0.00020135436,0.00036602534,0.000018049304,0.00003044047,0.00024488385,0.024525782,0.000004240912,0.000004451132,0.972936,0.0008327203],"about_ca_topic_score_codex":0.7085435,"about_ca_topic_score_gemma":0.9133813,"teacher_disagreement_score":0.2048378,"about_ca_system_score_codex":0.005213059,"about_ca_system_score_gemma":0.0073505873,"threshold_uncertainty_score":0.9995516},"labels":[],"label_agreement":null},{"id":"W7017099094","doi":"","title":"ABB Wins 85M Orders To Strengthen Power Grid In Canada","year":2016,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power grid; Power (physics); Government (linguistics); Grid; Work (physics)","score_opus":0.0029211799809941187,"score_gpt":0.16530872783899214,"score_spread":0.16238754785799803,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017099094","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000048729828,0.00016750516,0.0053489995,0.00008658067,0.0015698471,0.00036071314,0.000054781103,0.00032511147,0.9920377],"genre_scores_gemma":[0.025321154,0.000087381464,0.0011281207,0.0002170983,0.00023237562,0.00005411011,0.000032294043,0.00089135946,0.9720361],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99908286,0.000014721422,0.00020167725,0.00019564868,0.0001834182,0.00032169546],"domain_scores_gemma":[0.9995515,0.000023522744,0.000029316287,0.0002874416,0.00001203084,0.00009623507],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000038120255,0.00023146637,0.00025027516,0.00029491444,0.0000057889783,0.000011276329,0.00019959154,0.00018737793,0.00780105],"category_scores_gemma":[0.000013256881,0.00019785608,0.000019856312,0.00022513013,0.0000029769785,0.000025108791,0.000017223283,0.0001382786,0.00030324722],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[7.550749e-7,0.0000022096347,0.00013549585,0.000024901885,0.00003224935,0.0000067356323,0.000018755973,0.004987452,0.0000057444404,0.000051052317,0.994199,0.0005356735],"study_design_scores_gemma":[0.00019560731,0.000007986414,0.000055703007,0.00017756758,0.0000042405704,0.0000015050307,0.00001798697,0.0010993008,0.000027403832,0.0000010500803,0.99805206,0.0003595919],"about_ca_topic_score_codex":0.7797121,"about_ca_topic_score_gemma":0.9859868,"teacher_disagreement_score":0.20627476,"about_ca_system_score_codex":0.0008731775,"about_ca_system_score_gemma":0.00032697822,"threshold_uncertainty_score":0.99310595},"labels":[],"label_agreement":null},{"id":"W7017645315","doi":"","title":"Canada Power Market Outlook to 2030 Market Trends Regulations and Competitive Landscape","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Market power; Competition (biology); Market competition; Power market","score_opus":0.0022764754345324014,"score_gpt":0.16795356761133964,"score_spread":0.16567709217680723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017645315","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000002512071,0.0005490209,0.0033005157,0.00014604756,0.0007072948,0.00029216296,0.0002407174,0.00030951967,0.99445224],"genre_scores_gemma":[0.0032575266,0.00004565708,0.0011847009,0.00011575282,0.00008051814,0.00002231994,0.0000791573,0.00035460354,0.99485976],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99902666,0.000034631645,0.00019655675,0.0002685544,0.0002085159,0.0002650688],"domain_scores_gemma":[0.9994019,0.00005858852,0.0000471195,0.00033811483,0.000028517561,0.00012574407],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00007267925,0.0002848012,0.00033585113,0.00039280788,0.00001934424,0.000037304035,0.00012035499,0.00018679006,0.021254662],"category_scores_gemma":[0.000011991022,0.00028458136,0.000023850764,0.00029993287,0.0000069954745,0.000032476823,0.000030205674,0.00011284793,0.000046680143],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000032532073,0.0000028600164,0.00015788649,0.000048391892,0.00009355432,0.000003204313,0.000018085018,0.0004661625,0.0000012342756,0.00030746794,0.99866277,0.0002351124],"study_design_scores_gemma":[0.0002116034,0.000017903718,0.0016167073,0.00012143123,0.000023644512,0.0000074896902,0.000025340205,0.0069988277,0.000002363748,0.0000010510166,0.99060774,0.00036587223],"about_ca_topic_score_codex":0.045482352,"about_ca_topic_score_gemma":0.45251888,"teacher_disagreement_score":0.40703654,"about_ca_system_score_codex":0.00015053898,"about_ca_system_score_gemma":0.000117390184,"threshold_uncertainty_score":0.99996066},"labels":[],"label_agreement":null},{"id":"W7017704909","doi":"","title":"Canadian Solar Subsidiary Recurrent Energy Inks 100 Megawatt Power Purchase Agreement with Peninsula Clean Energy","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Peninsula; Energy (signal processing); Clean energy; Power (physics); Renewable energy; Solar energy; Electricity generation","score_opus":0.005031103313294286,"score_gpt":0.18344638632998797,"score_spread":0.17841528301669368,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017704909","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000010516631,0.0039527896,0.064244024,0.00005634294,0.0014292221,0.0002948727,0.00009089271,0.00065240596,0.92926896],"genre_scores_gemma":[0.106880836,0.0022541736,0.0012122854,0.00022004546,0.00058553886,0.00018692897,0.0009026898,0.0017337772,0.8860237],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99771196,0.00006466902,0.00033700204,0.0005730452,0.00045711847,0.000856219],"domain_scores_gemma":[0.99791735,0.000014409373,0.00019541239,0.0012133633,0.00006414678,0.0005952913],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00014120321,0.0006753964,0.00058164063,0.0009540222,0.00010947232,0.0001464854,0.00065579783,0.0006189107,0.00297648],"category_scores_gemma":[0.000011043604,0.00064370706,0.00010189707,0.0002244702,0.000038803533,0.00011476508,0.00004948378,0.00029845865,0.000085632724],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013405575,0.000035498597,0.00006242213,0.00008092927,0.00053003035,0.0002784239,0.00008174084,0.0015823015,0.000011677336,0.0016255102,0.97147405,0.02422401],"study_design_scores_gemma":[0.0004950924,0.00013162878,0.000014239846,0.00035113233,0.00006231318,0.00003330803,0.000010852529,0.0070580468,0.00025514193,0.000007948322,0.99068344,0.0008968778],"about_ca_topic_score_codex":0.3066917,"about_ca_topic_score_gemma":0.78691864,"teacher_disagreement_score":0.48022693,"about_ca_system_score_codex":0.0008681529,"about_ca_system_score_gemma":0.0004307642,"threshold_uncertainty_score":0.9996014},"labels":[],"label_agreement":null},{"id":"W7017805634","doi":"","title":"Canada Wind Power Market Size, Share, Growth, Trends, Opportunities and Forecast 2014-2025","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Power (physics); Market power; Boom; Investment (military)","score_opus":0.0070633950762892875,"score_gpt":0.17016381120214086,"score_spread":0.16310041612585158,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017805634","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000022330821,0.0018578855,0.001933246,0.000104618644,0.00084260467,0.00016188607,0.00025897787,0.0004079128,0.99443066],"genre_scores_gemma":[0.0035335957,0.00079391175,0.00042461994,0.00016907626,0.00016687658,0.000014416211,0.000110239904,0.0005387981,0.99424845],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99882203,0.000035879577,0.0002703097,0.00027295054,0.000245598,0.00035321643],"domain_scores_gemma":[0.9993226,0.000091112284,0.000085630934,0.00030566278,0.000035403365,0.00015959806],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00009703767,0.0004020329,0.00042866493,0.00030217477,0.000027933753,0.000057951762,0.00017922866,0.00028806957,0.03505991],"category_scores_gemma":[0.000026455686,0.0003932496,0.00003258852,0.00014132597,0.000020206213,0.00005909617,0.00003309644,0.0001501286,0.000018231918],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001847064,0.000002417492,0.000041984258,0.00018237624,0.00011060969,0.000012493442,0.000007680748,0.00003233164,6.3575607e-7,0.00029322124,0.9985546,0.00075982825],"study_design_scores_gemma":[0.00021914793,0.00002070451,0.00014150888,0.00014487818,0.000034327873,0.000019954645,0.000014677332,0.003243422,0.0000057216384,0.000005318278,0.9956753,0.0004750096],"about_ca_topic_score_codex":0.1358558,"about_ca_topic_score_gemma":0.363813,"teacher_disagreement_score":0.22795722,"about_ca_system_score_codex":0.00013391237,"about_ca_system_score_gemma":0.00017627748,"threshold_uncertainty_score":0.99985194},"labels":[],"label_agreement":null},{"id":"W7017842766","doi":"","title":"Canadian Energy(TM) Markets Retractable Solar Gensets With PWRstation(TM) in Canada - Energy (ENERGY01) News","year":2015,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Solar energy; Energy (signal processing); Renewable energy; Government (linguistics); Energy consumption","score_opus":0.0026047819482482113,"score_gpt":0.13776401580584116,"score_spread":0.13515923385759296,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017842766","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000017021102,0.002549229,0.008262758,0.000057452624,0.0006975869,0.00016806483,0.0001377123,0.00029715168,0.987813],"genre_scores_gemma":[0.03439972,0.0008568051,0.0020166272,0.0004379354,0.00028693222,0.00010374422,0.0015061243,0.0014162909,0.9589758],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976124,0.00008733909,0.00044441145,0.00046166335,0.0005179952,0.00087620184],"domain_scores_gemma":[0.99859893,0.000033620596,0.00012934151,0.00056658534,0.00009657335,0.00057497324],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00012515463,0.0005606749,0.0005590262,0.00091034983,0.000036660105,0.00006450745,0.00032311276,0.00043816798,0.0019296097],"category_scores_gemma":[0.000018825112,0.00056007266,0.000028381599,0.0009153329,0.0000103949515,0.00012583895,0.000015685742,0.00023669084,0.0000127078865],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":true,"study_design_scores_codex":[0.0000062301056,0.0000049500936,0.00014307053,0.000045716417,0.0001069983,0.0002554108,0.000020353202,0.03298964,0.0000028930226,0.00014252024,0.96513623,0.0011459644],"study_design_scores_gemma":[0.0003898274,0.000017871587,0.000028859185,0.0001569823,0.000023875727,0.000048336624,0.000047376157,0.03663977,0.000054698103,0.000013709372,0.961832,0.00074671645],"about_ca_topic_score_codex":0.9997052,"about_ca_topic_score_gemma":0.999994,"teacher_disagreement_score":0.0343827,"about_ca_system_score_codex":0.0055427905,"about_ca_system_score_gemma":0.0073928786,"threshold_uncertainty_score":0.99968505},"labels":[],"label_agreement":null},{"id":"W7017899859","doi":"","title":"Canadian Exchanges Stock Scanner Innergex Renewable Energy Polaris Infrastructure Transeastern Power Trust and NaiKun Wind Energy Group","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Renewable energy; Stock (firearms); Group (periodic table); Scanner; Power station; Energy (signal processing)","score_opus":0.003109354308114381,"score_gpt":0.16698073415099976,"score_spread":0.16387137984288538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017899859","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000032022093,0.013650724,0.03514124,0.00007115378,0.001911919,0.00024112708,0.00026548514,0.0006271148,0.9480592],"genre_scores_gemma":[0.07700114,0.0013928396,0.0006823562,0.00017282263,0.0005254906,0.00003397009,0.00026228128,0.0010969866,0.9188321],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980572,0.000054172528,0.00027750593,0.00055413315,0.0002821201,0.00077488465],"domain_scores_gemma":[0.9985063,0.000013163875,0.00013762964,0.00077606464,0.000042753953,0.00052409933],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00007926933,0.0006925101,0.0006229771,0.000992252,0.00014113907,0.00020660253,0.0004661531,0.0011010357,0.0024187858],"category_scores_gemma":[0.000009328827,0.0006850991,0.0000825748,0.00022555079,0.00004890912,0.00017748761,0.000035556564,0.00022532562,0.0000063249963],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006322321,0.0000069108683,0.00041233003,0.00014027326,0.00034461595,0.000035136385,0.00012844795,0.0029406766,0.000092847535,0.0002513058,0.9904312,0.005209926],"study_design_scores_gemma":[0.000418054,0.000050256356,0.00014917216,0.0002438002,0.000061302024,0.000044933,0.0000163525,0.006192495,0.00009244188,0.00002453632,0.99187666,0.00082999567],"about_ca_topic_score_codex":0.6625064,"about_ca_topic_score_gemma":0.8999173,"teacher_disagreement_score":0.2374109,"about_ca_system_score_codex":0.00036720798,"about_ca_system_score_gemma":0.00016767152,"threshold_uncertainty_score":0.99956},"labels":[],"label_agreement":null},{"id":"W7017922715","doi":"","title":"Caisse DE Depot ET Placement DU Quebec Trims Stake in General Electric (GE)","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Depot; Payment; Work (physics); Electric utility","score_opus":0.005293628025359688,"score_gpt":0.20598899376757066,"score_spread":0.20069536574221097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7017922715","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0009165856,0.0011861157,0.18746044,0.000025723577,0.00051440526,0.00063679734,0.000005238316,0.00096263754,0.80829203],"genre_scores_gemma":[0.012859656,0.0006404931,0.0063464325,0.000111524714,0.0005342063,0.00012092131,0.00008845062,0.0008561424,0.9784422],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986251,0.000084132516,0.0003349553,0.00027124822,0.0002051914,0.00047937312],"domain_scores_gemma":[0.9995039,0.000027276656,0.000073036324,0.00029124887,0.000021109747,0.00008340305],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00024997036,0.00033243347,0.00034729159,0.0006490339,0.000013095901,0.000050864906,0.0001976899,0.00036257628,0.0018521558],"category_scores_gemma":[0.000023990855,0.00033547223,0.00004985657,0.0005187349,0.0000071928353,0.00004838295,0.000017359247,0.00018510073,0.00023966031],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008502012,0.00003591815,0.00043539144,0.000121020144,0.000093486764,0.00002319847,0.00012176895,0.018419031,0.0004210611,0.00033554606,0.97933376,0.000651327],"study_design_scores_gemma":[0.001869053,0.00014547052,0.00039188834,0.00028459696,0.000061789724,0.000046498353,0.000022622276,0.30471194,0.0028071431,0.000012788701,0.68831986,0.0013263682],"about_ca_topic_score_codex":0.012214475,"about_ca_topic_score_gemma":0.061189197,"teacher_disagreement_score":0.2910139,"about_ca_system_score_codex":0.0007957745,"about_ca_system_score_gemma":0.00019250989,"threshold_uncertainty_score":0.99990976},"labels":[],"label_agreement":null},{"id":"W7018241209","doi":"","title":"Cordelio Power Sells 49% Stake in Ontario Renewable Power Portfolio to Axium Infrastructure - Commodities (COMMODIT) News","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Portfolio; Power (physics); Renewable energy; Key (lock); Investment (military)","score_opus":0.007944756730897215,"score_gpt":0.19297320662606068,"score_spread":0.18502844989516348,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7018241209","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00042906037,0.0012873532,0.015632287,0.00004236505,0.0029914428,0.0009417138,0.000081229664,0.0008457538,0.9777488],"genre_scores_gemma":[0.0132071525,0.00015755412,0.0062430566,0.00048390776,0.00017185343,0.00008791829,0.00063920964,0.0011741084,0.97783524],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9970776,0.000078901976,0.0008162576,0.0006643958,0.00051912246,0.0008437316],"domain_scores_gemma":[0.9982949,0.000044586104,0.00016395719,0.0011371943,0.00009529719,0.0002640842],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00015082,0.0008475007,0.0011042912,0.0011509664,0.000038206035,0.00018546614,0.00054849446,0.0009076399,0.048856877],"category_scores_gemma":[0.00002481949,0.0009000597,0.00015148285,0.00094080734,0.000024876843,0.00012814398,0.00013517542,0.0008271684,0.00017715317],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008779716,0.000027485827,0.0013521054,0.00008746685,0.00013678068,0.00006528429,0.0004841016,0.091037706,0.000044543547,0.000083629435,0.90662575,0.00004634505],"study_design_scores_gemma":[0.0005282332,0.00007419182,0.00076318445,0.0005070768,0.000026453874,0.000031662334,0.00022720602,0.00068835553,0.00010857626,0.000040056788,0.9959517,0.001053283],"about_ca_topic_score_codex":0.1347896,"about_ca_topic_score_gemma":0.7209676,"teacher_disagreement_score":0.586178,"about_ca_system_score_codex":0.001285267,"about_ca_system_score_gemma":0.00047709775,"threshold_uncertainty_score":0.999345},"labels":[],"label_agreement":null},{"id":"W7019340765","doi":"","title":"Germany's Siemens Energy posts further losses in second quarter","year":2023,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Siemens; Energy (signal processing); Quarter (Canadian coin); Energy consumption; Work (physics)","score_opus":0.003677588553923786,"score_gpt":0.18444167532542952,"score_spread":0.18076408677150574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7019340765","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000024798688,0.0008742219,0.0062143984,0.000026620692,0.0008471745,0.00014665141,0.000017435832,0.0023763457,0.9894723],"genre_scores_gemma":[0.015490248,0.00021911215,0.00019852865,0.00006220634,0.00023296253,0.00004770569,0.000029469576,0.0016618728,0.98205787],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99911433,0.000021829534,0.0002326509,0.00021297486,0.00012616768,0.00029203744],"domain_scores_gemma":[0.9996027,0.000030634368,0.000039804545,0.00027452374,0.000010110117,0.000042263608],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00005073166,0.0002496361,0.00026713547,0.0005092922,0.000005339275,0.000025935442,0.00012737181,0.0003013851,0.007660825],"category_scores_gemma":[0.0000039042025,0.00025074452,0.000042786098,0.00032643953,0.000007004378,0.000046860838,0.000013488387,0.00010888709,0.0006887211],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[7.9453923e-7,0.000009024091,0.000056374654,0.000105091436,0.000085070285,0.00003112387,0.000113096496,0.0012631053,0.000055321398,0.00021217339,0.997454,0.00061482744],"study_design_scores_gemma":[0.00041116073,0.000028134253,0.00018668575,0.0002778791,0.000015470378,0.0000102166305,0.000032927885,0.0147421155,0.00019890549,0.000032763688,0.9833315,0.000732229],"about_ca_topic_score_codex":0.0003134014,"about_ca_topic_score_gemma":0.016453974,"teacher_disagreement_score":0.016140573,"about_ca_system_score_codex":0.00010077851,"about_ca_system_score_gemma":0.000015054175,"threshold_uncertainty_score":0.99999446},"labels":[],"label_agreement":null},{"id":"W7019658000","doi":"","title":"Hydro-Québec and Transmission Developers Selected to Partner with New York State to Help Achieve the Clean Energy Transition","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"State (computer science); Clean energy; Energy (signal processing); Transmission (telecommunications); Key (lock); Electricity","score_opus":0.005991248222980696,"score_gpt":0.17906676184986103,"score_spread":0.17307551362688034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7019658000","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00013901872,0.0012196512,0.9277298,0.0011383665,0.000099196026,0.0005247512,0.0000061102337,0.0005829624,0.068560146],"genre_scores_gemma":[0.03292821,0.00066087744,0.021932937,0.0013079928,0.00031697837,0.00014524761,0.00023931984,0.0014570687,0.94101137],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99884754,0.000053425327,0.00021219501,0.00034811065,0.00022334547,0.000315353],"domain_scores_gemma":[0.9994347,0.000024146279,0.000028221195,0.00022508265,0.000037761085,0.000250089],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006103099,0.00034665572,0.00030259148,0.00020185947,0.000049384136,0.00006478008,0.00012855364,0.00016116737,0.0005199366],"category_scores_gemma":[0.000003944105,0.0002396414,0.0000272292,0.0009615786,0.000008953739,0.000029321192,0.000007705554,0.00013874251,0.00001145912],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009498155,0.000018574976,0.000007969847,0.00020124984,0.00037195592,0.000009756248,0.004491011,0.11692074,0.0018640609,0.000037506983,0.77637446,0.09960771],"study_design_scores_gemma":[0.00053691777,0.0002105814,0.000057111487,0.00079891447,0.00007825217,0.000037602924,0.00010943298,0.011445984,0.0054976325,0.000003190744,0.9804116,0.00081280875],"about_ca_topic_score_codex":0.012857763,"about_ca_topic_score_gemma":0.065406114,"teacher_disagreement_score":0.9057969,"about_ca_system_score_codex":0.00011861522,"about_ca_system_score_gemma":0.00024450367,"threshold_uncertainty_score":0.9937157},"labels":[],"label_agreement":null},{"id":"W7019789173","doi":"","title":"Hydro Ottawa Applauds Oxford Properties for Investing in Efficiency","year":2012,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Work (physics); Productivity; Investment (military)","score_opus":0.012940359598475537,"score_gpt":0.19497262251453507,"score_spread":0.18203226291605953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7019789173","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000030081404,0.0031342984,0.13172235,0.000006226142,0.0004796544,0.00090915203,0.0000039835927,0.00091488735,0.86279935],"genre_scores_gemma":[0.053303435,0.00010208593,0.018236304,0.00003920904,0.0005822691,0.0006347885,0.000050607414,0.0013237591,0.92572755],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990734,0.000013551438,0.00026905115,0.00016468085,0.00010597995,0.00037337313],"domain_scores_gemma":[0.99967813,0.000023691911,0.000056805195,0.00018355268,0.000010933408,0.00004688907],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017202072,0.0002300212,0.00026362966,0.0003447479,0.00001485888,0.000020882386,0.00015091951,0.00025371645,0.00016131981],"category_scores_gemma":[0.000040682833,0.00020207315,0.000035086727,0.00025554502,0.0000118707085,0.00005456289,0.00001357301,0.000116010815,0.000033210123],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005814885,0.000095520925,0.0011948602,0.005442141,0.00013383565,0.0000025153925,0.00067233935,0.07724263,0.001069883,0.0022736706,0.90173894,0.01012784],"study_design_scores_gemma":[0.00035291736,0.000025518246,0.000005612193,0.000491007,0.000018924873,0.000004911337,0.000014904894,0.23257512,0.0008074426,0.000009985845,0.76515937,0.00053432],"about_ca_topic_score_codex":0.000089312256,"about_ca_topic_score_gemma":0.00023654349,"teacher_disagreement_score":0.15533249,"about_ca_system_score_codex":0.00009568605,"about_ca_system_score_gemma":0.000022029399,"threshold_uncertainty_score":0.82403034},"labels":[],"label_agreement":null},{"id":"W7019795049","doi":"","title":"Identification of umbrella constraints in power generation scheduling problems","year":2015,"lang":"en","type":"dissertation","venue":"eScholarship@McGill (McGill)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"McGill University","keywords":"Exploit; Scheduling (production processes); Optimization problem; Set (abstract data type); Identification (biology); Consistency (knowledge bases); Electric power system; Constraint (computer-aided design); Power system simulation; Heuristics","score_opus":0.0177314913452713,"score_gpt":0.23761789936466293,"score_spread":0.21988640801939163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7019795049","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9559574,0.0012886998,0.000056572913,0.0000024962676,0.002668567,0.0013063943,0.0003392206,0.00038675938,0.037993904],"genre_scores_gemma":[0.9963062,0.00024182552,0.0007516896,0.0000084663625,0.000036888607,0.00016040246,0.0015153612,0.00022574147,0.00075346744],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99588543,0.00023367684,0.0018434935,0.00070604094,0.00080489356,0.000526453],"domain_scores_gemma":[0.9977382,0.00006850276,0.0006923285,0.00061078474,0.00071516924,0.0001750312],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0015588102,0.000599454,0.0007318711,0.0009005304,0.0001573451,0.0000778153,0.0004323777,0.0009377771,0.00006700398],"category_scores_gemma":[0.0005236269,0.00074956665,0.00015572229,0.0010812042,0.000038719903,0.00070846657,0.000027697266,0.0009327879,0.00011417727],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003685454,0.00014887255,0.000036821722,0.001080909,0.00020094348,0.000014638408,0.00008098859,0.17831239,0.7797875,0.012559995,0.000015334865,0.027724748],"study_design_scores_gemma":[0.003654133,0.00027397994,0.0007944557,0.0030316012,0.00039276484,0.00007420914,0.00071967236,0.108222425,0.8676621,0.008578623,0.002969709,0.0036263363],"about_ca_topic_score_codex":0.000056652847,"about_ca_topic_score_gemma":0.00054826855,"teacher_disagreement_score":0.08787459,"about_ca_system_score_codex":0.0011318707,"about_ca_system_score_gemma":0.000094697076,"threshold_uncertainty_score":0.9994955},"labels":[],"label_agreement":null},{"id":"W7023815645","doi":"","title":"Power Corporation of Canada (via Public) / Power Corporation Reports First Quarter Financial Results and Dividend Increase of 7%","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Corporation; Quarter (Canadian coin); Dividend; Power (physics)","score_opus":0.005397743168676217,"score_gpt":0.17125268341000963,"score_spread":0.1658549402413334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7023815645","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00094672805,0.00079385785,0.03311668,0.0001490895,0.0023021877,0.0010161797,0.00028205034,0.00023382728,0.9611594],"genre_scores_gemma":[0.92824763,0.000045990295,0.0005183702,0.000008339454,0.0000773843,0.00001774687,0.0003649233,0.00017002597,0.07054961],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982016,0.000038131897,0.00077671534,0.00032774056,0.00043049865,0.00022531224],"domain_scores_gemma":[0.99755126,0.00004426899,0.0013676203,0.0007209714,0.00020567897,0.000110218025],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00035473937,0.0003030613,0.0005162346,0.00030045575,0.000054819015,0.00005139071,0.00013614885,0.00036336252,0.0002182819],"category_scores_gemma":[0.00033782297,0.00030748217,0.000044109434,0.00014246195,0.000046389487,0.00025692588,0.000030221821,0.00012905725,0.0000015220181],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021737416,0.000020323758,0.0010248435,0.0002139318,0.00006454873,0.000037588838,0.00006481861,0.00026205563,0.00006303747,0.00023682872,0.99793047,0.00005982679],"study_design_scores_gemma":[0.004034031,0.00076839124,0.013895809,0.0025316954,0.00027263508,0.0003692226,0.0000545939,0.018517327,0.0024650516,0.00054304017,0.9533153,0.0032328647],"about_ca_topic_score_codex":0.1153138,"about_ca_topic_score_gemma":0.5952651,"teacher_disagreement_score":0.9273009,"about_ca_system_score_codex":0.00014502087,"about_ca_system_score_gemma":0.00051945716,"threshold_uncertainty_score":0.9999377},"labels":[],"label_agreement":null},{"id":"W7023971795","doi":"","title":"Power Corporation Reports Fourth Quarter and 2017 Financial Results","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Corporation; Quarter (Canadian coin); Power (physics); Financial management; Work (physics)","score_opus":0.005371328527516661,"score_gpt":0.1905274293721199,"score_spread":0.18515610084460324,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7023971795","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000014628215,0.00024570982,0.060504597,0.000019154644,0.0017162754,0.0002892455,0.000011262744,0.00063050236,0.9365686],"genre_scores_gemma":[0.012487043,0.000098209195,0.0048602186,0.00002181347,0.0006189935,0.000020072448,0.00016033539,0.00034360695,0.9813897],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99911094,0.000015017803,0.0003085844,0.0002619462,0.00014203295,0.00016145791],"domain_scores_gemma":[0.9993748,0.000009277772,0.00017800387,0.00035337073,0.00003556958,0.000048977523],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001384784,0.00020391094,0.00021344217,0.00018606277,0.00002116399,0.000047611542,0.00004730428,0.00034287528,0.00041882147],"category_scores_gemma":[0.000044988235,0.00019508941,0.000024707244,0.00010198637,0.000017895727,0.00007012917,0.0000102614895,0.0000765342,0.00016757184],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003702634,0.0000033995013,0.00002210839,0.00002798873,0.000016247881,0.000025101297,0.000036479993,0.00005486353,0.000008670065,0.0000631631,0.9996683,0.00006998723],"study_design_scores_gemma":[0.0002889997,0.00008307317,0.00010908083,0.00014824771,0.000018132689,0.00010521848,0.0000030786514,0.0047921007,0.000045294066,0.00007472188,0.9939383,0.00039369814],"about_ca_topic_score_codex":0.00003126947,"about_ca_topic_score_gemma":0.00018160282,"teacher_disagreement_score":0.055644378,"about_ca_system_score_codex":0.00003511937,"about_ca_system_score_gemma":0.000029714965,"threshold_uncertainty_score":0.7955515},"labels":[],"label_agreement":null},{"id":"W7024626484","doi":"","title":"SNL: MidAmerican forms venture with TransAlta to compete for 500-kV Alberta project","year":2013,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Work (physics); Government (linguistics); Process (computing); Agency (philosophy)","score_opus":0.004127414833711951,"score_gpt":0.19651139163313236,"score_spread":0.1923839767994204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7024626484","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000009677212,0.00021924582,0.4332164,0.00006476886,0.0002351965,0.0030415256,0.00003753091,0.0006576276,0.562518],"genre_scores_gemma":[0.0019606478,0.0000508782,0.035932045,0.00014156227,0.0002179973,0.0011657065,0.00021982507,0.0014348641,0.9588765],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99888724,0.000010197165,0.00021531725,0.00030883768,0.00016789595,0.00041053531],"domain_scores_gemma":[0.99939775,0.000036714253,0.0000662588,0.00037233022,0.000031261792,0.0000956884],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0000369667,0.0003890795,0.00045967888,0.0003012592,0.000020835207,0.00004656758,0.00024488792,0.00022265318,0.00049371977],"category_scores_gemma":[0.000005920522,0.00028653385,0.00007341699,0.0003802848,0.000011897594,0.00005354089,0.0000072303365,0.00012622908,0.00010280988],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014122762,0.000018234561,0.000016848444,0.00064833456,0.00029649897,0.0000010247306,0.00025484408,0.0039410642,0.00004310035,0.00042066103,0.9926484,0.0016968219],"study_design_scores_gemma":[0.00049897947,0.00028437967,0.0000044144617,0.0002977533,0.000061055456,0.000009298823,0.0000313413,0.014292324,0.00012343773,0.0000020150346,0.9838172,0.00057776144],"about_ca_topic_score_codex":0.0014949231,"about_ca_topic_score_gemma":0.0028870362,"teacher_disagreement_score":0.39728436,"about_ca_system_score_codex":0.00008421442,"about_ca_system_score_gemma":0.00004541629,"threshold_uncertainty_score":0.9999587},"labels":[],"label_agreement":null},{"id":"W7025293720","doi":"","title":"UGE International Reports 2015 First Quarter Financial Results - Power Engineering International","year":2015,"lang":"en","type":"other","venue":"Power engineering international","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Electric power industry; Power (physics); International finance; Electric utility","score_opus":0.0035143714836365176,"score_gpt":0.1945741624880028,"score_spread":0.1910597910043663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7025293720","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000102636724,0.0017746189,0.070419334,0.0010108708,0.100141004,0.0008828149,0.0018032851,0.004886055,0.8189794],"genre_scores_gemma":[0.35723072,0.0010632223,0.03289254,0.00040280764,0.019174237,0.0009720198,0.016612645,0.0067978958,0.5648539],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99528366,0.000018503984,0.0013892587,0.00094856706,0.0016125138,0.0007475113],"domain_scores_gemma":[0.997904,0.00008613617,0.00042780716,0.00080862554,0.0004363671,0.0003370542],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00052228646,0.0010100394,0.00068081514,0.0017899035,0.00003689187,0.00030669002,0.0012734315,0.0007936042,0.0024128996],"category_scores_gemma":[0.00082822057,0.0011999913,0.00027468422,0.00043644937,0.000031821204,0.00049065286,0.00023410085,0.00087943935,0.00045283826],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029025987,0.00006294319,0.00007032398,0.000049960556,0.00075177813,0.0002491058,0.00021924921,0.14084959,0.00008108706,0.00028527176,0.8573105,0.000041198633],"study_design_scores_gemma":[0.0009284945,0.000040689218,0.00019700453,0.0005503255,0.00003903556,0.00028988137,0.000008194703,0.10375702,0.000056949702,0.000010168199,0.8930923,0.0010299729],"about_ca_topic_score_codex":0.000048668328,"about_ca_topic_score_gemma":0.000041971805,"teacher_disagreement_score":0.35712808,"about_ca_system_score_codex":0.0012734914,"about_ca_system_score_gemma":0.00014635712,"threshold_uncertainty_score":0.999045},"labels":[],"label_agreement":null},{"id":"W7025543570","doi":"","title":"What's the Next Big Thing in the APAC Solid State Transformers Market ? ABB (Switzerland), Siemens AG (Germany), Alstom (France), Schneider Electric SA (France), Avago Technologies Limited (U.S.), Bombardier, Inc. (Canada),Cooper Power Systems (U.S.)","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Siemens; Solid-state; Transformer; Electric power; Power (physics)","score_opus":0.006035840607808262,"score_gpt":0.19117159028972566,"score_spread":0.1851357496819174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7025543570","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010656158,0.2535803,0.050852917,0.0026869741,0.018258832,0.016176876,0.00031292223,0.007503179,0.64956236],"genre_scores_gemma":[0.45114556,0.09964669,0.00027911432,0.001905665,0.00054192194,0.0018044647,0.0003208939,0.0034606513,0.44089505],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9936653,0.00038759946,0.0014595052,0.0010488982,0.0014915325,0.0019472032],"domain_scores_gemma":[0.9969274,0.0004957703,0.00047761135,0.0018204264,0.00016068439,0.000118137075],"candidate_categories":["metaepi_narrow"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.0014189166,0.0014758918,0.0016067999,0.0013806811,0.00024039355,0.0009914314,0.0019605833,0.0010915302,0.00024996104],"category_scores_gemma":[0.000099461875,0.0009664398,0.0002457748,0.0029513808,0.00012626346,0.0007832089,0.00009215669,0.0020046702,0.00013724896],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005284719,0.000084518266,0.00019293712,0.0011798984,0.001304313,0.00009599403,0.0012681177,0.019385582,0.0005901657,0.00015206583,0.9657324,0.009961165],"study_design_scores_gemma":[0.0015187834,0.00014018209,0.0002436727,0.0015372862,0.00017776646,0.00010788464,0.0029367888,0.050228395,0.00023333653,0.000015514051,0.94086844,0.0019919304],"about_ca_topic_score_codex":0.018938553,"about_ca_topic_score_gemma":0.032391474,"teacher_disagreement_score":0.45007995,"about_ca_system_score_codex":0.0006457342,"about_ca_system_score_gemma":0.0005558411,"threshold_uncertainty_score":0.9997991},"labels":[],"label_agreement":null},{"id":"W7027126263","doi":"","title":"Canadian Government Invests in First Nation Microgrid Project","year":2023,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Key (lock); Microgrid; Power (physics)","score_opus":0.010169530052345653,"score_gpt":0.18443368546265815,"score_spread":0.17426415541031248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7027126263","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000012931951,0.0005351675,0.00037044412,0.00007480782,0.0009221787,0.0006934184,0.000053260224,0.0012997283,0.9960381],"genre_scores_gemma":[0.0031215101,0.0011915594,0.0010463265,0.00006305676,0.00027776923,0.0002446869,0.0000956895,0.00208914,0.9918703],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99927473,0.000010064396,0.00015233696,0.00015214876,0.00017314914,0.00023756939],"domain_scores_gemma":[0.9997573,0.0000125750685,0.000026901569,0.0001448265,0.000005288326,0.00005311982],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007406971,0.000155946,0.00014172902,0.00041807254,0.000009885691,0.000023507273,0.00009786913,0.00021639245,0.00019451609],"category_scores_gemma":[0.00001837643,0.0001708728,0.000019425455,0.0004670667,0.0000031027175,0.000029540146,0.000007323183,0.0001016036,0.00022078211],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[2.0571125e-7,0.0000026673408,0.0005057777,0.00010566376,0.000026109758,0.000011019716,0.000059455364,0.0020525514,0.0000032936596,0.000056329256,0.99655586,0.00062106206],"study_design_scores_gemma":[0.00014243384,0.00000719649,0.00011372663,0.00024956703,0.0000053812264,0.0000021627877,0.000013481456,0.01707872,0.000044153672,0.0000018662046,0.98207766,0.00026364787],"about_ca_topic_score_codex":0.42563525,"about_ca_topic_score_gemma":0.98815084,"teacher_disagreement_score":0.5625156,"about_ca_system_score_codex":0.0022013753,"about_ca_system_score_gemma":0.00010045144,"threshold_uncertainty_score":0.69679904},"labels":[],"label_agreement":null},{"id":"W7027274198","doi":"","title":"Canada Invests Over $960-Million in Renewable Energy and Grid","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Renewable energy; Grid; Energy (signal processing); Power grid; Intermittent energy source","score_opus":0.0031359663696301663,"score_gpt":0.15778382025392548,"score_spread":0.1546478538842953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7027274198","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000020572594,0.00838659,0.00332621,0.000016024102,0.0008562219,0.00007487383,0.00001094438,0.00013874639,0.9871698],"genre_scores_gemma":[0.0024812636,0.0017675852,0.0006047354,0.00017032011,0.00023152654,0.00001832111,0.0001549088,0.00035326488,0.99421805],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99937457,0.000019037947,0.00014207172,0.0001708404,0.00012028207,0.00017318092],"domain_scores_gemma":[0.9997381,0.000012360952,0.000025574023,0.00016319116,0.000007371434,0.000053426513],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000028100892,0.00016010209,0.00020841167,0.00017851911,0.0000059922527,0.000017101676,0.000054657274,0.00017473403,0.0010065826],"category_scores_gemma":[0.000007381075,0.00017014249,0.000010176336,0.00027214226,0.000003901906,0.000018971677,0.000016734022,0.00005656656,4.7790843e-7],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[2.1877062e-7,0.000001590776,0.0001575432,0.0000943732,0.000018897372,0.00001980346,0.0000032163023,0.015793836,0.000043892727,0.00005003728,0.9837215,0.000095110496],"study_design_scores_gemma":[0.00014579321,0.0000031467616,0.00007126061,0.00021178927,0.000004470126,0.00000640186,0.0000026216114,0.022211386,0.0003236642,0.000005640762,0.9767815,0.00023232857],"about_ca_topic_score_codex":0.9562566,"about_ca_topic_score_gemma":0.9966767,"teacher_disagreement_score":0.040420026,"about_ca_system_score_codex":0.00021781716,"about_ca_system_score_gemma":0.00019130352,"threshold_uncertainty_score":0.99990666},"labels":[],"label_agreement":null},{"id":"W7029222084","doi":"","title":"An iterative approach to negotiating bilateral contracts in mixed pool/bilateral electricity markets /","year":2005,"lang":"en","type":"dissertation","venue":"eScholarship@McGill (McGill)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Negotiation; Generator (circuit theory); Work (physics); Sign (mathematics); Electricity market; Electricity system","score_opus":0.007771502258791819,"score_gpt":0.21612627113538632,"score_spread":0.20835476887659451,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7029222084","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9270283,0.00037631526,0.00005007366,0.0000037736113,0.0016876812,0.0020965633,0.00035829432,0.0008989598,0.06750004],"genre_scores_gemma":[0.9917725,0.00008076733,0.003371632,0.00011061772,0.00015037578,0.0004537865,0.002363818,0.00046441262,0.0012321409],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9935868,0.0007553254,0.0017242464,0.0014663372,0.0008756267,0.0015917146],"domain_scores_gemma":[0.99752575,0.00021429274,0.00044136282,0.0008299882,0.00040316817,0.00058544346],"candidate_categories":["metaepi_narrow"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.0012115353,0.0013272606,0.0013295421,0.001538499,0.00046579912,0.0004162282,0.00084719615,0.0012806879,0.00004763068],"category_scores_gemma":[0.00043009358,0.001526,0.0002360208,0.0019520627,0.000015765578,0.002027152,0.000048403523,0.0022575422,0.00010323454],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012337421,0.0014232688,0.00041280978,0.0013282797,0.000872445,0.00024066356,0.0005098168,0.6545623,0.1921613,0.01005726,0.0000522676,0.13714588],"study_design_scores_gemma":[0.00867479,0.001277157,0.06720774,0.0027158963,0.0006655095,0.00034298323,0.0008090577,0.66776913,0.22693506,0.0013296674,0.009990233,0.012282771],"about_ca_topic_score_codex":0.00021348106,"about_ca_topic_score_gemma":0.00090401876,"teacher_disagreement_score":0.1248631,"about_ca_system_score_codex":0.0023763245,"about_ca_system_score_gemma":0.00006716023,"threshold_uncertainty_score":0.99994785},"labels":[],"label_agreement":null},{"id":"W7029227700","doi":"","title":"The Influence of Internet Media on Young Adult Development","year":2024,"lang":"en","type":"article","venue":"Scholars Crossing (Liberty University)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"The Internet; Social media; Qualitative research; Young adult; Grounded theory; Qualitative property; Data collection; Qualitative analysis; Content analysis","score_opus":0.005035876258636245,"score_gpt":0.1799886828323829,"score_spread":0.17495280657374665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7029227700","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9871346,0.00031662488,0.00461508,0.000029891711,0.0005970554,0.00009105585,0.0000027691958,0.0003331576,0.006879765],"genre_scores_gemma":[0.9967566,0.000041656967,0.0006856065,0.000010189129,0.000014408124,4.7096765e-7,0.0000036251295,0.000021624142,0.0024657845],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992486,0.000032577187,0.00016546722,0.00015750315,0.00019634397,0.00019948887],"domain_scores_gemma":[0.99953556,0.00012001384,0.000029274612,0.00016858087,0.000095071235,0.000051527444],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016714701,0.00011794056,0.00009669374,0.00021678065,0.00022162261,0.00038752268,0.000282337,0.000074699274,0.000004321138],"category_scores_gemma":[0.00007449593,0.000100756275,0.000037861802,0.0006650005,0.00008872045,0.00046716322,0.000042523585,0.00026806685,0.00003679426],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035659398,0.00016513496,0.020165736,0.0017950444,0.0017277902,0.00088930933,0.07736345,0.6118083,0.040941633,0.06853997,0.010962157,0.16528487],"study_design_scores_gemma":[0.0026007423,0.00022767167,0.10166101,0.008397749,0.0002273874,0.00013548405,0.0015650966,0.19429655,0.13927804,0.00046909522,0.5485534,0.002587735],"about_ca_topic_score_codex":0.00001921459,"about_ca_topic_score_gemma":0.000080472295,"teacher_disagreement_score":0.5375913,"about_ca_system_score_codex":0.00030074088,"about_ca_system_score_gemma":0.00012103055,"threshold_uncertainty_score":0.41087216},"labels":[],"label_agreement":null},{"id":"W7029362041","doi":"","title":"I Squared Capital to Sell Cube Hydro to Ontario Power Generation - news","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Capital (architecture); Production (economics); Power (physics); Electricity generation; Cube (algebra); Hydro power","score_opus":0.0061321094114457336,"score_gpt":0.18376536920141462,"score_spread":0.17763325978996888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7029362041","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00067239616,0.00014798963,0.1640561,0.00004769139,0.0024458484,0.001214297,0.000013004799,0.00081472535,0.8305879],"genre_scores_gemma":[0.00853139,0.0000069639514,0.00714892,0.00025040662,0.00035390691,0.000058065656,0.00012852403,0.00064667716,0.98287517],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99877083,0.000018043229,0.00027055637,0.0003717882,0.00024395903,0.00032479878],"domain_scores_gemma":[0.9992466,0.000007395592,0.000040192343,0.00051564985,0.00003061363,0.00015952869],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000053377255,0.00034593663,0.00033825764,0.00043252256,0.000014413223,0.00007505013,0.00019190321,0.00033650253,0.004395338],"category_scores_gemma":[0.000007858964,0.00035906708,0.00006155641,0.00025248367,0.0000020234625,0.00006310384,0.000027816433,0.00014639302,0.006885722],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000015628019,0.000008502209,0.00004284253,0.00001962384,0.000053430424,0.0000020678372,0.00080193195,0.061944917,0.00055116,0.00009945732,0.9363483,0.00012615614],"study_design_scores_gemma":[0.00020139314,0.00009578886,0.000016858612,0.00006055609,0.000019630515,0.0000042600245,0.00001887562,0.006991311,0.00048663316,0.0000010007528,0.9915093,0.000594349],"about_ca_topic_score_codex":0.02091863,"about_ca_topic_score_gemma":0.16923305,"teacher_disagreement_score":0.15690719,"about_ca_system_score_codex":0.00062956236,"about_ca_system_score_gemma":0.00007834723,"threshold_uncertainty_score":0.99988616},"labels":[],"label_agreement":null},{"id":"W7030313420","doi":"","title":"MidAmerican Transmission Enters the Competitive Transmission Arena with Joint Venture in Canada\\n| Reuters","year":2012,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transmission (telecommunications); Joint (building); Joint venture; Key (lock); Competitive advantage","score_opus":0.0036922901389908887,"score_gpt":0.15697133495444077,"score_spread":0.15327904481544988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7030313420","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000038897106,0.005253837,0.20248292,0.0005055818,0.0005289638,0.0011352893,0.000029150342,0.0003925705,0.7896328],"genre_scores_gemma":[0.58557004,0.0061278143,0.01573253,0.0009986656,0.000678264,0.00039252307,0.00065162167,0.003988242,0.3858603],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99879324,0.00007041221,0.00024440742,0.00021407995,0.0003023576,0.00037550583],"domain_scores_gemma":[0.99950975,0.000023372317,0.00007759348,0.00025004445,0.000011383466,0.00012782654],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000067571586,0.0003419023,0.00035959488,0.00017898834,0.000023646577,0.000013993624,0.00018990664,0.0001315542,0.00089253014],"category_scores_gemma":[9.979628e-7,0.00021125085,0.0000457719,0.00031862003,0.000023458184,0.00003772407,0.0000053459717,0.000346447,0.000005538475],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000097789554,0.00009722124,0.0007046454,0.0014078973,0.0006319436,0.000114063914,0.0031487073,0.045170777,0.0007499169,0.00023020829,0.8729331,0.07471373],"study_design_scores_gemma":[0.0005516806,0.000042231288,0.0003127911,0.0017852664,0.000055452227,0.000021711181,0.00039184338,0.009242591,0.000514544,7.622718e-7,0.9865565,0.00052465237],"about_ca_topic_score_codex":0.3065168,"about_ca_topic_score_gemma":0.4206701,"teacher_disagreement_score":0.5855312,"about_ca_system_score_codex":0.0006234022,"about_ca_system_score_gemma":0.00021821746,"threshold_uncertainty_score":0.9772579},"labels":[],"label_agreement":null},{"id":"W7030364967","doi":"","title":"N.Y.C. Looking at Deal for Canadian Hydroelectricity","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydroelectricity; Government (linguistics); Work (physics); Field (mathematics)","score_opus":0.00431390956567574,"score_gpt":0.1801079898927196,"score_spread":0.17579408032704386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7030364967","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000041450085,0.00092756504,0.06828283,0.0000126880805,0.0006421807,0.0008117936,0.000038040653,0.00071748625,0.9285633],"genre_scores_gemma":[0.0043874057,0.000056752175,0.0019921334,0.00005828458,0.00023364322,0.000054477474,0.000114615985,0.00082823366,0.99227446],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999089,0.000008214831,0.00014669697,0.00020399717,0.00009925681,0.00045285956],"domain_scores_gemma":[0.99955726,0.000027780894,0.000038711558,0.00023441337,0.000015885757,0.00012592244],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000060476224,0.00022417503,0.00025551885,0.00047917993,0.00003237173,0.0000216373,0.00015381728,0.00036236574,0.0007535406],"category_scores_gemma":[0.000007720167,0.00024096516,0.00006092415,0.00018265958,0.0000036981394,0.000021560843,0.000008113482,0.000095102165,0.00048035348],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.6385667e-7,0.000001104893,0.00004303697,0.0001467663,0.0000665802,0.0000011824883,0.000008382787,0.0031918176,0.0000153486,0.00022256319,0.9955195,0.0007830162],"study_design_scores_gemma":[0.00016905887,0.000013802988,0.0000027370013,0.0000460303,0.000020237221,0.0000050125113,6.0856513e-7,0.08958968,0.00015324423,0.0000046851414,0.9097075,0.00028742373],"about_ca_topic_score_codex":0.03390191,"about_ca_topic_score_gemma":0.3653629,"teacher_disagreement_score":0.331461,"about_ca_system_score_codex":0.0008609377,"about_ca_system_score_gemma":0.000111406465,"threshold_uncertainty_score":0.98262745},"labels":[],"label_agreement":null},{"id":"W7030513807","doi":"","title":"National Instruments and Prolucid Put Green Energy on the Canadian Grid","year":2013,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Grid; Energy (signal processing); Renewable energy; National Grid; Efficient energy use; Measure (data warehouse)","score_opus":0.005380907904338332,"score_gpt":0.16245472285994725,"score_spread":0.1570738149556089,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7030513807","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000063148727,0.00013571611,0.000409566,0.0002580616,0.0003381354,0.0002213512,0.000023022792,0.00016291009,0.9984449],"genre_scores_gemma":[0.016627477,0.00007568438,0.00021954483,0.0005140743,0.00036779622,0.000109536064,0.00008491284,0.00028092487,0.98172003],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99941504,0.000015275997,0.00009142859,0.0001217724,0.0001926382,0.0001638565],"domain_scores_gemma":[0.99974644,0.000011285184,0.000026245545,0.00011874417,0.000020410396,0.000076899014],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0000477631,0.00014531951,0.00009598976,0.00024520684,0.00003771631,0.000048539347,0.00010923108,0.00016937935,0.0013885815],"category_scores_gemma":[0.000006907331,0.000105549545,0.000013011545,0.00010067768,0.000010499927,0.000027351392,0.000008133905,0.00008542572,0.00012416962],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[1.5911667e-7,0.0000015133869,0.000020794094,0.000014782222,0.00005811546,4.11751e-7,0.000007839444,0.00023372206,9.040076e-7,0.011041789,0.98679256,0.0018274282],"study_design_scores_gemma":[0.00008573473,0.000010739639,0.000057280184,0.000046779678,0.0000048273196,0.0000046048276,0.0000010255386,0.03603105,0.000021995536,0.00006412921,0.9634993,0.00017254018],"about_ca_topic_score_codex":0.2395231,"about_ca_topic_score_gemma":0.44104457,"teacher_disagreement_score":0.20152146,"about_ca_system_score_codex":0.00020222511,"about_ca_system_score_gemma":0.000088857785,"threshold_uncertainty_score":0.9995243},"labels":[],"label_agreement":null},{"id":"W7030550751","doi":"","title":"NKT secures contract for the Canadian transmission line Hertel-New York","year":2022,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Transmission (telecommunications); Line (geometry)","score_opus":0.010983517146395875,"score_gpt":0.20253382346964585,"score_spread":0.19155030632324999,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7030550751","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[1.13249705e-7,0.019948183,0.24601641,0.00056193623,0.0008890764,0.0013038985,0.000077037796,0.00064917165,0.73055416],"genre_scores_gemma":[0.0032762212,0.00036933745,0.0023941032,0.0002603859,0.0006252217,0.00014962183,0.00022492204,0.0007883766,0.9919118],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991958,0.00001821102,0.00017305352,0.00016442934,0.00015307136,0.00029543604],"domain_scores_gemma":[0.999454,0.000086758075,0.00003734785,0.0002506641,0.000010304647,0.00016088212],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00010947611,0.0002170377,0.0002159221,0.0001844048,0.00010332477,0.00004723299,0.00025483785,0.00023745313,0.016204014],"category_scores_gemma":[0.000011216753,0.00015998082,0.00008515337,0.00018827769,0.0000058215287,0.000015554146,0.0000037660825,0.00021595239,0.00002252358],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002384346,0.000002562179,0.0000017119188,0.00005951208,0.00011075907,0.0000017287293,0.000088905574,0.0153107215,0.000004630167,0.0002201524,0.97501993,0.009176978],"study_design_scores_gemma":[0.00023848425,0.000021065844,0.0000020230445,0.000035165045,0.00004476359,0.00000426954,0.000009117178,0.07995526,0.000023680772,0.0000103693765,0.91946316,0.00019263347],"about_ca_topic_score_codex":0.17517164,"about_ca_topic_score_gemma":0.5731308,"teacher_disagreement_score":0.39795914,"about_ca_system_score_codex":0.00028756465,"about_ca_system_score_gemma":0.00028128902,"threshold_uncertainty_score":0.9846953},"labels":[],"label_agreement":null},{"id":"W7030588641","doi":"","title":"Northern Power Systems Announces Strong Third Quarter 2014 Revenue Growth and Achieves EBITDA Profitability","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Earnings before interest, taxes, depreciation, and amortization; Profitability index; Quarter (Canadian coin); Revenue; Power (physics)","score_opus":0.0033481297260577183,"score_gpt":0.18008173726329896,"score_spread":0.17673360753724124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7030588641","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008289372,0.00709312,0.063417196,0.000051726674,0.0019013033,0.0014147143,0.0001523987,0.0013910269,0.92374957],"genre_scores_gemma":[0.6594075,0.00030957197,0.0011762255,0.000027709486,0.0006769309,0.0002536478,0.00015258345,0.0010890252,0.3369068],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99848145,0.00012569479,0.0003746159,0.00041241437,0.00026131805,0.00034451357],"domain_scores_gemma":[0.99919116,0.000051262366,0.00014857663,0.00046387728,0.0000536262,0.000091478236],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028448316,0.00040956523,0.00053732743,0.00017813871,0.000037380574,0.000108122564,0.00020233472,0.00040454694,0.00007799967],"category_scores_gemma":[0.000028737106,0.00035169677,0.00005684732,0.000122074,0.000041979183,0.00010340009,0.00002451102,0.000241484,0.00021268346],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000050740273,0.000020149055,0.00881511,0.0017639697,0.00021262835,0.0000025443867,0.00022429967,0.00048984605,0.00007902956,0.0006358436,0.98769647,0.000055040207],"study_design_scores_gemma":[0.003212353,0.0011524166,0.008343062,0.0050706626,0.00061065017,0.00018747547,0.001038272,0.067261994,0.00021906546,0.00023999233,0.904557,0.008107065],"about_ca_topic_score_codex":0.00046630146,"about_ca_topic_score_gemma":0.00093110005,"teacher_disagreement_score":0.6585786,"about_ca_system_score_codex":0.0000780375,"about_ca_system_score_gemma":0.000028567918,"threshold_uncertainty_score":0.9998935},"labels":[],"label_agreement":null},{"id":"W7033283514","doi":"","title":"Portable Power Station Market (US$ 5.9 Billion) | North America Dominate by United States, Canada, Mexico","year":2023,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Government (linguistics); Power station","score_opus":0.002051402900571746,"score_gpt":0.1603223056021972,"score_spread":0.15827090270162547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7033283514","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00009295664,0.0015359273,0.06071179,0.00012330302,0.002128418,0.0010679859,0.0032833926,0.005036514,0.9260197],"genre_scores_gemma":[0.0009749188,0.002737831,0.0005859448,0.00024940495,0.000042752115,0.00008049239,0.007932236,0.001991353,0.9854051],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982098,0.000058818907,0.0004188987,0.0003489574,0.00044033374,0.00052322744],"domain_scores_gemma":[0.99911314,0.00007760385,0.00018045309,0.00039711973,0.00007578919,0.00015588266],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00009249243,0.00042963805,0.00041718053,0.00062964833,0.0000385125,0.00004942228,0.00020833615,0.00019440154,0.004804148],"category_scores_gemma":[0.00002720512,0.00042784368,0.000038847014,0.0017568208,0.000016558246,0.00008286194,0.000021035221,0.0002141472,0.0001284789],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003619317,0.000007837472,0.0001804827,0.00007131862,0.00016539324,0.000021081254,0.00002121544,0.036809936,0.0000017165013,0.0000036503843,0.9621251,0.00058861217],"study_design_scores_gemma":[0.00020908572,0.00001943937,0.0000861843,0.000064685795,0.000029658726,0.0000018494175,0.00003454632,0.06993071,0.000017924276,0.0000011556724,0.92912585,0.00047894052],"about_ca_topic_score_codex":0.69679934,"about_ca_topic_score_gemma":0.80800545,"teacher_disagreement_score":0.11120612,"about_ca_system_score_codex":0.0005058745,"about_ca_system_score_gemma":0.00018655983,"threshold_uncertainty_score":0.9998173},"labels":[],"label_agreement":null},{"id":"W7036605822","doi":"","title":"Canada Hydropower Market Research &amp;amp; Analysis Report 2025: Radiant Insights, Inc","year":2015,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Market research; Market analysis; Government (linguistics)","score_opus":0.02524277314629747,"score_gpt":0.27831804724647624,"score_spread":0.25307527410017877,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7036605822","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000054330294,0.0046579633,0.012502302,0.00006269028,0.0008694217,0.00043733264,0.00008020262,0.00046590634,0.98091877],"genre_scores_gemma":[0.0011964772,0.0004071732,0.0016868691,0.000028171004,0.00028786375,0.000042711235,0.0014068796,0.0005619871,0.99438184],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99666816,0.00021580959,0.00060351286,0.00055150467,0.0013289298,0.0006321104],"domain_scores_gemma":[0.9976721,0.00008821517,0.00013066398,0.0014641533,0.00029091403,0.00035399658],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00096183346,0.00040381026,0.0007283225,0.0018492934,0.000050647002,0.000076490745,0.0004292005,0.00047037992,0.020147901],"category_scores_gemma":[0.00020972866,0.0003755401,0.00008939301,0.00355853,0.000038057886,0.000058160942,0.00007495132,0.00056858483,0.00043505031],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000023223115,0.000009245594,0.00006357199,0.00007214787,0.0012342867,0.00022420204,0.000026899144,0.004141924,0.0000028299364,0.000019074165,0.9941605,0.000042997097],"study_design_scores_gemma":[0.00010715802,0.0000038797452,0.000015768868,0.000047122878,0.00017275033,0.000033962133,0.0000083172745,0.0105952965,0.000003658952,0.0000061756664,0.9885766,0.0004292994],"about_ca_topic_score_codex":0.772814,"about_ca_topic_score_gemma":0.9840572,"teacher_disagreement_score":0.21124318,"about_ca_system_score_codex":0.0015217955,"about_ca_system_score_gemma":0.0017303583,"threshold_uncertainty_score":0.99986964},"labels":[],"label_agreement":null},{"id":"W7037802107","doi":"","title":"An Environmentally Conscious Robust Optimization Approach for Planning Power Generating Systems","year":2007,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Production (economics); Work (physics); Measure (data warehouse); Mains electricity; Term (time); Context (archaeology)","score_opus":0.008652195106460562,"score_gpt":0.1920649120680526,"score_spread":0.18341271696159203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7037802107","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2048456,0.0006455514,0.7911939,0.000003153561,0.0006479557,0.0010418096,0.000058800935,0.0002884083,0.001274807],"genre_scores_gemma":[0.32124075,0.00014928197,0.5898919,0.000008998321,0.00021635386,0.000013356897,0.014821798,0.00035387414,0.07330368],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986842,0.000046238158,0.0002535494,0.0003825716,0.00027871056,0.00035469694],"domain_scores_gemma":[0.9992134,0.000029876408,0.00025528768,0.00029056935,0.00010424583,0.00010661939],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002572194,0.000321186,0.00043565693,0.00039998672,0.00021551168,0.00005731222,0.0002936408,0.00048834836,0.000025409918],"category_scores_gemma":[0.0000061247365,0.00042940894,0.00010028468,0.00018624544,0.000027412798,0.00034335637,0.00001206447,0.00019096739,0.0000022919783],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050547413,0.0000365044,0.0000620433,0.0005055216,0.00011785894,0.0000065387453,0.019695498,0.9754761,0.0035795944,0.000017966522,0.00034782372,0.000104025065],"study_design_scores_gemma":[0.0005270608,0.0001145078,0.000036101028,0.00013139841,0.00011798502,0.000006047274,0.052048076,0.9460929,0.0004898734,3.3669377e-7,0.00002925535,0.00040645784],"about_ca_topic_score_codex":0.0009293377,"about_ca_topic_score_gemma":0.00031865106,"teacher_disagreement_score":0.20130199,"about_ca_system_score_codex":0.00027399996,"about_ca_system_score_gemma":0.000034492055,"threshold_uncertainty_score":0.99981576},"labels":[],"label_agreement":null},{"id":"W7043142420","doi":"","title":"RE Royalties Provides $6.3 Million Financing for a 200 Megawatt Solar Project in Alberta, Canada","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Investment (military); Work (physics); Payment","score_opus":0.006302046186512186,"score_gpt":0.20016690633054007,"score_spread":0.19386486014402787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7043142420","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000019096213,0.012914396,0.022411834,0.00018188433,0.0024296795,0.0036879526,0.000094014336,0.00094146165,0.9573197],"genre_scores_gemma":[0.0035301875,0.00014782915,0.0028568383,0.000034258803,0.00019477055,0.0005312069,0.00007627082,0.00090289954,0.99172574],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988282,0.000017881503,0.00031257636,0.00031253244,0.00015881927,0.00036999345],"domain_scores_gemma":[0.9996113,0.00006370058,0.000050493385,0.0002257493,0.000020185451,0.00002855667],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010610373,0.0003137665,0.00036569487,0.00043118882,0.000014699323,0.000046604357,0.00013311963,0.0002605293,0.00009129901],"category_scores_gemma":[0.00005873804,0.0002932815,0.0000499267,0.00035265123,0.0000051403217,0.00004377426,0.00001579724,0.00017998653,0.00001872497],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002482777,0.0000031588845,0.000022770573,0.0023238831,0.000054435553,0.0000075620146,0.0001422861,0.0044510737,0.0000027522624,0.00005219482,0.9926243,0.0003131073],"study_design_scores_gemma":[0.00017839485,0.000023560084,0.0000014050745,0.0013023285,0.000030899522,0.000002647521,0.000086232794,0.09756762,0.00014857683,0.0000155257,0.90022326,0.00041955017],"about_ca_topic_score_codex":0.88071215,"about_ca_topic_score_gemma":0.9946864,"teacher_disagreement_score":0.11397427,"about_ca_system_score_codex":0.0005542925,"about_ca_system_score_gemma":0.0005322356,"threshold_uncertainty_score":0.99995196},"labels":[],"label_agreement":null},{"id":"W7043146046","doi":"","title":"Selection for \"Ice Resistant\" Antifreeze Proteins and Ice or Hydrate Inhibition","year":2007,"lang":"en","type":"article","venue":"NPARC","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Antifreeze protein; Selection (genetic algorithm); Antifreeze; Hydrate; Congelation","score_opus":0.009112896717597452,"score_gpt":0.21756410679407442,"score_spread":0.20845121007647696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7043146046","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20915496,0.00007540799,0.7758661,0.000075642216,0.0002151068,0.0009915335,0.000008953539,0.0004938988,0.013118424],"genre_scores_gemma":[0.98015934,0.000021306007,0.019060656,0.000020783153,0.000118335825,0.000055100147,0.0000137569605,0.00003479135,0.000515899],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99929714,0.000014803811,0.00019925824,0.00015140486,0.00010528241,0.00023210031],"domain_scores_gemma":[0.99969405,0.00006175705,0.000039178933,0.00008450357,0.000071644165,0.00004886073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036025594,0.00010262359,0.00010509888,0.000118863434,0.00008439053,0.00003797692,0.00003106943,0.000089395275,0.000017946524],"category_scores_gemma":[0.000065175525,0.00010044089,0.000017171107,0.00036335486,0.000010094175,0.00018114752,0.000006034463,0.000075675845,0.000005158706],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015435265,0.000014885439,0.00006858919,0.00022927015,0.000018742636,0.0000027163787,0.00014123805,0.0008340479,0.9917088,0.0005722719,0.0022579303,0.003997141],"study_design_scores_gemma":[0.0013718299,0.00039404182,0.0012376484,0.00016817005,0.000044127348,0.00005059417,0.000048652604,0.22723348,0.758679,0.0009976227,0.0093368,0.00043806736],"about_ca_topic_score_codex":0.0000083996865,"about_ca_topic_score_gemma":0.00017251186,"teacher_disagreement_score":0.7710044,"about_ca_system_score_codex":0.000101441176,"about_ca_system_score_gemma":0.000016559672,"threshold_uncertainty_score":0.40958607},"labels":[],"label_agreement":null},{"id":"W7043727639","doi":"","title":"TransAlta Corporation - Alberta Utilities Commission approves settlement agreement","year":2012,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Commission; Settlement (finance); Corporation; European commission; Human settlement","score_opus":0.009439502486170391,"score_gpt":0.19348884447837952,"score_spread":0.18404934199220913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7043727639","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[8.3228815e-7,0.0017514701,0.14086682,0.000037320668,0.0008468729,0.00058170885,0.000037873142,0.0005067563,0.85537034],"genre_scores_gemma":[0.005518578,0.0002054941,0.0026155657,0.000017311588,0.00024822098,0.00007883525,0.0006296194,0.00041797705,0.9902684],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989581,0.00003518585,0.0003005965,0.00017899851,0.0002464195,0.00028068596],"domain_scores_gemma":[0.99944717,0.000024370687,0.00008628825,0.00033825918,0.000014734807,0.00008920307],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00010452832,0.00030633368,0.00026846325,0.00019260947,0.000025608137,0.000034677636,0.00013953076,0.00025012568,0.008810207],"category_scores_gemma":[0.0000038855082,0.00028017207,0.00005246339,0.00012027716,0.000013318451,0.0000839224,0.000012208787,0.00011360107,0.00028498782],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000020413813,0.000029667082,0.00003398089,0.00045551526,0.000107850654,3.0055e-7,0.00021357313,0.00063536986,0.00006584195,0.0017797324,0.9939261,0.0027500342],"study_design_scores_gemma":[0.00021275943,0.000024142772,0.000009265556,0.00015363871,0.000046723344,0.0000016777308,0.00003923367,0.014132709,0.00043896775,0.000015033426,0.9845896,0.00033628862],"about_ca_topic_score_codex":0.0004627598,"about_ca_topic_score_gemma":0.0007014696,"teacher_disagreement_score":0.13825125,"about_ca_system_score_codex":0.00011118322,"about_ca_system_score_gemma":0.000017236593,"threshold_uncertainty_score":0.9999651},"labels":[],"label_agreement":null},{"id":"W7043832076","doi":"","title":"Un diseño de política eléctrica basado en el modelo HRV para expansión óptima de redes de transmisión aplicaciones en Ontario y enseñanzas para México","year":2012,"lang":"es","type":"dissertation","venue":"LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Marginal product; Context (archaeology); Labor contract","score_opus":0.01509032624381715,"score_gpt":0.24797417379097508,"score_spread":0.23288384754715794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7043832076","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45817655,0.007948384,0.46013942,0.010165154,0.0036631592,0.0050764508,0.00051048305,0.003000582,0.051319826],"genre_scores_gemma":[0.9668222,0.0015257414,0.024725948,0.0001503214,0.0016145401,0.0014441377,0.0022636699,0.00054509495,0.0009083267],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9878596,0.0018471158,0.0027062255,0.0020936222,0.0019623155,0.0035311216],"domain_scores_gemma":[0.9929504,0.0012476756,0.0011668848,0.0017704576,0.000858477,0.002006138],"candidate_categories":["metaepi_narrow","sts","research_integrity"],"consensus_categories":["metaepi_narrow","research_integrity"],"category_scores_codex":[0.001932948,0.0023129673,0.0021283661,0.0017125427,0.0015910815,0.0008936799,0.0020165057,0.003734343,0.0001733882],"category_scores_gemma":[0.00090964173,0.002592369,0.001048466,0.0018151314,0.00005802493,0.0013465452,0.00020674642,0.0031987706,0.00006109932],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0030280612,0.0042421957,0.010237299,0.003921879,0.0043909466,0.0010371292,0.08568185,0.06645246,0.096130386,0.7128435,0.0010583361,0.0109760165],"study_design_scores_gemma":[0.0073964936,0.00068203796,0.21232937,0.003610043,0.004216653,0.0073854337,0.0024799563,0.107065275,0.025610466,0.0022309897,0.6186692,0.008324087],"about_ca_topic_score_codex":0.00031421753,"about_ca_topic_score_gemma":0.0027633288,"teacher_disagreement_score":0.7106125,"about_ca_system_score_codex":0.009639041,"about_ca_system_score_gemma":0.00424809,"threshold_uncertainty_score":0.9997087},"labels":[],"label_agreement":null},{"id":"W7044311769","doi":"","title":"Wind Power in Canada, Market Outlook to 2030, Update 2017","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Power (physics); Boom; Investment (military)","score_opus":0.0032190963081117747,"score_gpt":0.17585640769677688,"score_spread":0.17263731138866512,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7044311769","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00001566241,0.000344599,0.004689898,0.00004833413,0.0014987094,0.00038331063,0.000034081513,0.00022651665,0.99275887],"genre_scores_gemma":[0.0021622735,0.000054190743,0.0014027008,0.00018140062,0.00013832904,0.000012631174,0.000022482047,0.00047314022,0.99555284],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99892205,0.0000226148,0.00023541886,0.00024720153,0.00020639953,0.00036628637],"domain_scores_gemma":[0.99937683,0.000011652555,0.000041101364,0.0004351303,0.000018861349,0.00011642742],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00009688726,0.00026656236,0.0003045574,0.00034035931,0.000008592702,0.000022281578,0.00026216608,0.00018775748,0.026877826],"category_scores_gemma":[0.000013739142,0.00027318735,0.000021740792,0.00023857143,0.0000051612174,0.00003168548,0.000029837218,0.00010941207,0.0012778181],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001746159,0.000002209679,0.00018461871,0.00003038468,0.00003396337,0.00001595994,0.000010912422,0.00087417115,0.000001938775,0.000009251568,0.9987429,0.00009197176],"study_design_scores_gemma":[0.00013490157,0.00000838416,0.00028805673,0.00013720067,0.0000062268286,0.00000394033,0.000006454189,0.0031450614,0.000017282502,0.0000013708225,0.9958923,0.0003588373],"about_ca_topic_score_codex":0.52254957,"about_ca_topic_score_gemma":0.96411103,"teacher_disagreement_score":0.44156146,"about_ca_system_score_codex":0.0006812844,"about_ca_system_score_gemma":0.00028558428,"threshold_uncertainty_score":0.99997205},"labels":[],"label_agreement":null},{"id":"W7045127249","doi":"","title":"Alberta Electricity Regulator Adopts Least Stringent Approach to Renewable Energy Pause, Industry Responds with Mixed Reactions","year":2023,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Renewable energy; Electricity; Electric power industry; Regulator; Electricity generation; Production (economics)","score_opus":0.009193958066437151,"score_gpt":0.18880790622894172,"score_spread":0.17961394816250456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045127249","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000032223135,0.0001951687,0.1477593,0.000026369436,0.00046839664,0.00049351936,0.000022082035,0.0031025775,0.84790033],"genre_scores_gemma":[0.009009478,0.00009488111,0.00378884,0.000026240217,0.00033887132,0.00028903052,0.000100781726,0.0019781666,0.9843737],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99775904,0.0000697588,0.00042194643,0.00063932716,0.0004549571,0.0006549517],"domain_scores_gemma":[0.99856496,0.00007629898,0.00013870094,0.00086443365,0.00006504831,0.00029053597],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015804936,0.00055275986,0.0005355292,0.0011165963,0.00006552495,0.0000765528,0.0003390679,0.0011318028,0.0002101595],"category_scores_gemma":[0.00006413484,0.0005225999,0.000066113644,0.0026787415,0.000014218761,0.000091310496,0.000048353024,0.0005228384,0.00007746519],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022200082,0.000046712503,0.000042685286,0.000093665825,0.00029730488,0.000004364376,0.000021025651,0.21456079,0.00011294301,0.0003663215,0.7841727,0.0002592764],"study_design_scores_gemma":[0.00048183915,0.00012761584,0.00009283779,0.00042907914,0.00011274926,0.000043790726,0.0000374381,0.019239893,0.002195827,0.0000051133447,0.97613716,0.001096636],"about_ca_topic_score_codex":0.025407482,"about_ca_topic_score_gemma":0.044433594,"teacher_disagreement_score":0.1953209,"about_ca_system_score_codex":0.000545225,"about_ca_system_score_gemma":0.00014419836,"threshold_uncertainty_score":0.99972254},"labels":[],"label_agreement":null},{"id":"W7045512901","doi":"","title":"Ballard Announces Sales Agreement With M-Field For Clean Baseload Power Systems -- VANCOUVER, Jan. 9, 2014","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Electric power system; Base load power plant; Measure (data warehouse); Power grid","score_opus":0.003716174954356592,"score_gpt":0.18251475949001544,"score_spread":0.17879858453565886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045512901","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000011779749,0.0020625498,0.5137973,0.000011187103,0.0022647937,0.0009312233,0.00005091132,0.0006639982,0.4802169],"genre_scores_gemma":[0.007870638,0.0006940694,0.009609762,0.00015581364,0.00066721195,0.00046366567,0.00026695387,0.0012266808,0.9790452],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99832845,0.000040807598,0.00038362318,0.00040673497,0.00038843552,0.0004519765],"domain_scores_gemma":[0.99896955,0.000119435004,0.00017768554,0.00053720095,0.000088187604,0.00010792992],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025423194,0.0004907876,0.00058435247,0.00028433013,0.00003998868,0.000085422085,0.00029257505,0.00040422578,0.00070299173],"category_scores_gemma":[0.00001955069,0.00039395248,0.00008815113,0.00015148333,0.000015519925,0.00006434335,0.000018078745,0.00014377036,0.00026719956],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014278618,0.000013382499,0.00003634885,0.0006114793,0.00030449295,0.0000022151721,0.000021851782,0.0096695535,0.000006790002,0.00027547096,0.988799,0.00024518275],"study_design_scores_gemma":[0.00053697295,0.0003106852,0.0000016658738,0.0005377196,0.00007920569,0.0000047266435,0.0000805455,0.022909308,0.000050067705,0.000002532064,0.9748883,0.0005982719],"about_ca_topic_score_codex":0.00018777573,"about_ca_topic_score_gemma":0.0062286137,"teacher_disagreement_score":0.50418746,"about_ca_system_score_codex":0.00012977139,"about_ca_system_score_gemma":0.000045620483,"threshold_uncertainty_score":0.9998512},"labels":[],"label_agreement":null},{"id":"W7045584575","doi":"","title":"Canada Wind Power Industry Report 2023: Renewable Power, Power Generation, Installed Capacity, Deal Analysis 2010-2035","year":2023,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Renewable energy; Power (physics); Electric power industry; Production (economics)","score_opus":0.01147624453864317,"score_gpt":0.1999261066944721,"score_spread":0.18844986215582893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045584575","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000739115,0.0006739604,0.012860932,0.00014539855,0.0049047815,0.0007225238,0.0002823654,0.0021776392,0.9774933],"genre_scores_gemma":[0.035133652,0.00009495174,0.0011264666,0.00012902648,0.00031207906,0.000046369074,0.00061243266,0.0015031549,0.96104187],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.996295,0.00008231413,0.0009642628,0.0008499904,0.0010178075,0.00079065695],"domain_scores_gemma":[0.9977306,0.000046679423,0.0003910225,0.0013196507,0.00018406982,0.00032796388],"candidate_categories":["metaepi_narrow","research_integrity","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00041387125,0.00075793546,0.0010494551,0.0013144726,0.0001013207,0.00014452274,0.00043308822,0.001652319,0.013276069],"category_scores_gemma":[0.00010315735,0.0008024029,0.0002319239,0.0029695379,0.000031492375,0.0001622613,0.00008350231,0.00080449705,0.00010573399],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013823909,0.00001460496,0.0007273559,0.000019788184,0.002137438,0.0002678855,0.00002717313,0.10465895,0.000054977227,0.000035592744,0.89204824,0.000006592564],"study_design_scores_gemma":[0.0004807123,0.00003567717,0.0004916997,0.00009645055,0.0006066073,0.00011409084,0.00005741179,0.010271763,0.00020471474,0.0000040426426,0.9860802,0.0015566078],"about_ca_topic_score_codex":0.7155684,"about_ca_topic_score_gemma":0.9567332,"teacher_disagreement_score":0.2411648,"about_ca_system_score_codex":0.0011509021,"about_ca_system_score_gemma":0.0011502245,"threshold_uncertainty_score":0.99964374},"labels":[],"label_agreement":null},{"id":"W7045634738","doi":"","title":"Canada’s Leading Renewable Energy Stock Combines Growth With High Yield","year":2019,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Stock (firearms); Renewable energy; Yield (engineering); Energy consumption; Work (physics)","score_opus":0.0043814032454028585,"score_gpt":0.15138808799765152,"score_spread":0.14700668475224865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045634738","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000013916269,0.0005777832,0.075811654,0.00003559001,0.00079288945,0.00016252085,0.000013518206,0.00061182975,0.92199284],"genre_scores_gemma":[0.019540427,0.00009850374,0.0007699874,0.000081272905,0.00013898604,0.000019613237,0.000052789615,0.0006459044,0.97865254],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99902827,0.000009731506,0.00016564425,0.00023297463,0.00026098723,0.00030238763],"domain_scores_gemma":[0.9994573,0.000046421872,0.00006720906,0.00033081442,0.00003494782,0.000063325075],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000029847874,0.00029744074,0.00037321387,0.00019367712,0.000018108318,0.000029302906,0.00019571642,0.00023660835,0.0006042876],"category_scores_gemma":[0.000008274226,0.00025853535,0.00001984204,0.00021624462,0.0000059046433,0.000040466504,0.000015009362,0.00011136454,0.000021987331],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014278675,0.0000028554707,0.000050644358,0.00016754797,0.00010920423,0.0000060117704,0.000003010514,0.039183125,0.000019593946,0.0011000681,0.95933694,0.000019601917],"study_design_scores_gemma":[0.00043350895,0.00007486067,0.000007877045,0.00079577323,0.00006107145,0.000019918312,0.000008970863,0.012277089,0.0019165905,0.000014954814,0.9834253,0.00096406654],"about_ca_topic_score_codex":0.96716964,"about_ca_topic_score_gemma":0.98311645,"teacher_disagreement_score":0.07504167,"about_ca_system_score_codex":0.0002465434,"about_ca_system_score_gemma":0.00038278234,"threshold_uncertainty_score":0.9999867},"labels":[],"label_agreement":null},{"id":"W7045654264","doi":"","title":"Blackstone preps $7B in new funding for Canada-to-NYC hydropower line","year":2022,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Line (geometry); Work (physics); Government (linguistics)","score_opus":0.007582794504543528,"score_gpt":0.21420066398915538,"score_spread":0.20661786948461186,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045654264","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000019242721,0.0011379621,0.16716942,0.00017731391,0.0019002466,0.0015624488,0.000051096966,0.0006927361,0.8272895],"genre_scores_gemma":[0.002809909,0.000028306556,0.0041259583,0.00014920332,0.00032375337,0.000106032494,0.00012760086,0.00078962493,0.9915396],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987431,0.000016172557,0.00030091623,0.00029972073,0.00023244217,0.00040760214],"domain_scores_gemma":[0.99942535,0.00004425172,0.000053930573,0.0003263559,0.000010718978,0.00013942049],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00011539269,0.0002699501,0.0003523572,0.00046280993,0.000019249188,0.00001920203,0.00023352455,0.0001521311,0.0075150877],"category_scores_gemma":[0.00004146055,0.00030568673,0.000040729115,0.0005191053,0.0000029420623,0.000026191385,0.000042540618,0.00018329565,0.000026138823],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000035971566,0.000005755998,0.000031603904,0.00011486142,0.000046795336,0.000005961144,0.00004137869,0.07012941,0.000025348872,0.000098256896,0.9291462,0.00035087107],"study_design_scores_gemma":[0.00032860425,0.000031972697,0.0000050446715,0.000076609365,0.000014619747,0.0000031967395,0.000016338758,0.03604969,0.00007138238,0.000006611168,0.96302664,0.0003692692],"about_ca_topic_score_codex":0.22347891,"about_ca_topic_score_gemma":0.82941604,"teacher_disagreement_score":0.6059371,"about_ca_system_score_codex":0.0011812147,"about_ca_system_score_gemma":0.00046928518,"threshold_uncertainty_score":0.9999395},"labels":[],"label_agreement":null},{"id":"W7045659258","doi":"","title":"A $4B powerline will run under Lake Champlain, power NYC, and impact Quebec","year":2022,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Line (geometry); Field (mathematics); Power grid; Hydrology (agriculture)","score_opus":0.003431192633069012,"score_gpt":0.20019689245522246,"score_spread":0.19676569982215344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045659258","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00008389636,0.0059627667,0.038031526,0.000088764304,0.0009233677,0.00068973284,0.00017975758,0.0020317081,0.9520085],"genre_scores_gemma":[0.013721132,0.0004979426,0.0008659255,0.00019107328,0.00020783754,0.00005799619,0.00049558363,0.001377895,0.9825846],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99860084,0.000046698446,0.00028404815,0.00036070164,0.00028532514,0.00042237877],"domain_scores_gemma":[0.9992528,0.000042585365,0.00008702916,0.00045742185,0.000021661874,0.00013850078],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00013796767,0.00046615588,0.0004732383,0.00048642422,0.00004305082,0.00006902309,0.00018584833,0.0003274051,0.0675679],"category_scores_gemma":[0.000015531003,0.00042597664,0.00009949575,0.00038166138,0.000022281802,0.00009858849,0.000067234076,0.00033396407,0.000081844184],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006105438,0.000025253037,0.00012734857,0.00010351528,0.00037553807,0.000021360282,0.00012342143,0.0061333627,0.000024318959,0.00072055834,0.9919786,0.0003606541],"study_design_scores_gemma":[0.0005224166,0.00007979401,0.0001747921,0.000062943895,0.000039445084,0.00006982522,0.000056848494,0.004504415,0.0000053318295,0.000022623546,0.99376786,0.0006936999],"about_ca_topic_score_codex":0.001659338,"about_ca_topic_score_gemma":0.02131557,"teacher_disagreement_score":0.067486055,"about_ca_system_score_codex":0.00030848663,"about_ca_system_score_gemma":0.00006876252,"threshold_uncertainty_score":0.9998192},"labels":[],"label_agreement":null},{"id":"W7045797346","doi":"","title":"Canada Power Market Outlook to 2030, Update 2018-Market Trends, Regulations, and Competitive Landscape – World Gazette","year":2020,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Market power; Competition (biology); Government (linguistics); Market competition","score_opus":0.0027701007035345693,"score_gpt":0.16796273201317236,"score_spread":0.1651926313096378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045797346","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[7.5138774e-7,0.0014077836,0.004064222,0.0012521277,0.0007785,0.00035137948,0.00045821973,0.0005451759,0.99114186],"genre_scores_gemma":[0.0013425578,0.00016555603,0.0031991068,0.0008425382,0.00020899474,0.000035557594,0.00026607985,0.0005177672,0.99342185],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99850106,0.00006666407,0.00033119463,0.00042684583,0.0003036415,0.00037058408],"domain_scores_gemma":[0.9991906,0.00006187736,0.00008615984,0.0003662026,0.000026299851,0.00026885126],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000094722214,0.00043748072,0.0004977833,0.00055968,0.0000350347,0.00006904884,0.00019318893,0.00015626416,0.03408056],"category_scores_gemma":[0.000018972785,0.00044949257,0.000036286554,0.0006988606,0.000012637289,0.00005539499,0.000056327095,0.00020574735,0.0000653643],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009583655,0.0000035561297,0.00013050895,0.00006243008,0.00016253922,0.000015350515,0.000016770804,0.00033153628,0.0000018077685,0.00031269927,0.99862725,0.00032596948],"study_design_scores_gemma":[0.0002563894,0.000014389521,0.00070531014,0.00015199199,0.00004165857,0.0000061360784,0.0000139690965,0.006346527,0.0000060314237,0.0000025737813,0.99193996,0.00051504816],"about_ca_topic_score_codex":0.026755376,"about_ca_topic_score_gemma":0.621319,"teacher_disagreement_score":0.5945636,"about_ca_system_score_codex":0.00017425983,"about_ca_system_score_gemma":0.00012783488,"threshold_uncertainty_score":0.9997957},"labels":[],"label_agreement":null},{"id":"W7045928022","doi":"","title":"Capital Power Reports Third Quarter 2014 Results - Earnings News (EARNINGS) News","year":2014,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Earnings; Quarter (Canadian coin); Power (physics); Capital (architecture)","score_opus":0.0032049251433559564,"score_gpt":0.1859848507065288,"score_spread":0.18277992556317282,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045928022","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00012992107,0.0006306367,0.046735324,0.000106386535,0.0027863337,0.0006109098,0.000010279418,0.0031750465,0.94581515],"genre_scores_gemma":[0.0142759085,0.00018968078,0.0030032273,0.0001365743,0.00082693563,0.000051654053,0.00028381078,0.00130868,0.97992355],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9968137,0.00011353598,0.0010295967,0.00082350743,0.00052844186,0.00069117494],"domain_scores_gemma":[0.99780434,0.00006886376,0.0006425358,0.0011894789,0.00007126491,0.0002235192],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00041573495,0.0007167251,0.0008039988,0.00058716,0.000051129824,0.0001448113,0.00029055262,0.00093957176,0.0030940368],"category_scores_gemma":[0.00018409175,0.00067941245,0.000203087,0.0002889798,0.000030985313,0.0001409311,0.000049392926,0.00068332144,0.0033661139],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000709198,0.000011487147,0.000372726,0.00008161619,0.00012137136,0.00005891862,0.000397447,0.0024520312,0.00004991081,0.000025987774,0.9962869,0.00013446873],"study_design_scores_gemma":[0.00044557458,0.00010791099,0.00018218128,0.00022852345,0.00004694078,0.00013006636,0.0000615822,0.0019898207,0.00002996709,0.000007600582,0.9958926,0.0008772208],"about_ca_topic_score_codex":0.0014175571,"about_ca_topic_score_gemma":0.0007176481,"teacher_disagreement_score":0.0437321,"about_ca_system_score_codex":0.00014291625,"about_ca_system_score_gemma":0.000055926244,"threshold_uncertainty_score":0.9995657},"labels":[],"label_agreement":null},{"id":"W7066373450","doi":"","title":"Hydropower from Quebec is worth pursuing, despite concerns about power lines - Editorials","year":2013,"lang":"en","type":"other","venue":"The Boston globe","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydropower; Electric power transmission; Power (physics); Line (geometry); Government (linguistics)","score_opus":0.005742683703475134,"score_gpt":0.21653081657215298,"score_spread":0.21078813286867784,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7066373450","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007198602,0.038559947,0.028230889,0.00023473345,0.10547667,0.0031148435,0.000963333,0.004079282,0.81862044],"genre_scores_gemma":[0.01596582,0.0010192746,0.00060571457,0.0004394241,0.030635482,0.00023845615,0.00039375736,0.0019803809,0.9487217],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972343,0.00011476476,0.00065874297,0.00061377947,0.0006925525,0.0006858476],"domain_scores_gemma":[0.9979472,0.00012703022,0.00038783695,0.0012433175,0.00011367609,0.0001809072],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0001999375,0.000784613,0.000800533,0.00023639055,0.000080206366,0.00028356825,0.00087269593,0.00097232254,0.010052701],"category_scores_gemma":[0.000033620603,0.0006441301,0.00021742137,0.00040668013,0.00009610057,0.00015446053,0.000098599936,0.00048461833,0.002988566],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005059079,0.000016996786,0.0000923438,0.000041557847,0.00031964498,0.0000073690994,0.00034745177,0.0005349402,0.00018614216,0.00005073089,0.9976355,0.0007622635],"study_design_scores_gemma":[0.00040164552,0.000029595096,0.000047267848,0.00039841066,0.00012123409,0.0000028643187,0.00002363796,0.002390341,0.0002531386,0.00002496124,0.99556917,0.00073775166],"about_ca_topic_score_codex":0.019155819,"about_ca_topic_score_gemma":0.0070019676,"teacher_disagreement_score":0.13010125,"about_ca_system_score_codex":0.00036397687,"about_ca_system_score_gemma":0.00011556775,"threshold_uncertainty_score":0.999601},"labels":[],"label_agreement":null},{"id":"W7066584009","doi":"","title":"Hydrostor Secures Funding to Advance Long Duration Energy Storage in Canada","year":2021,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Duration (music); Government (linguistics); Work (physics); Subsidy; Order (exchange)","score_opus":0.003469791070888807,"score_gpt":0.17999650362322372,"score_spread":0.17652671255233493,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7066584009","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00012838648,0.006517225,0.40753427,0.00003529646,0.0021662796,0.00025512456,0.000016085756,0.00032281852,0.5830245],"genre_scores_gemma":[0.25348675,0.0004851614,0.0029471386,0.00017831154,0.0004087059,0.0001096613,0.00027555574,0.0008374559,0.74127126],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990959,0.00002474257,0.00022542251,0.0002191383,0.00018402771,0.00025074548],"domain_scores_gemma":[0.99963975,0.000019364945,0.000045535297,0.00020891926,0.000013668968,0.000072787545],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00003677711,0.000198356,0.00023615397,0.0002608179,0.000011014155,0.000021716152,0.0001026615,0.000113322116,0.0010198765],"category_scores_gemma":[0.000018841922,0.00023212226,0.000016945633,0.00044136768,0.0000015024601,0.00003934891,0.00001602417,0.000092447044,0.0000047468193],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000016098177,0.0000047809312,0.0002711294,0.00024550478,0.000043636264,0.00012353908,0.000056136854,0.5108457,0.00033674052,0.0003616315,0.48638195,0.0013276049],"study_design_scores_gemma":[0.00023545841,0.000012016746,0.00019688302,0.0008145831,0.000009770275,0.000014096492,0.000048673508,0.1452082,0.0012919969,0.0000019896663,0.8513323,0.00083404325],"about_ca_topic_score_codex":0.6941299,"about_ca_topic_score_gemma":0.9961687,"teacher_disagreement_score":0.40458712,"about_ca_system_score_codex":0.0016221415,"about_ca_system_score_gemma":0.00026509564,"threshold_uncertainty_score":0.9998933},"labels":[],"label_agreement":null},{"id":"W7070794706","doi":"","title":"Pre-Market Technical Pulse on Electric Utilities Stocks -- Entergy, Great Plains Energy, Atlantica Yield, and Companhia Energetica de Minas Gerais | Home","year":2017,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pulse (music); Quarter (Canadian coin); Exclosure","score_opus":0.006523447194588696,"score_gpt":0.20566963812219433,"score_spread":0.19914619092760563,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7070794706","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00019146813,0.0032528213,0.03990686,0.000037795216,0.00042187757,0.00041029052,0.00006136681,0.0013952779,0.9543222],"genre_scores_gemma":[0.37125623,0.0031794547,0.0007712985,0.00005029337,0.00032592614,0.0001457086,0.00008682258,0.00061687845,0.6235674],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99779356,0.000074829746,0.00037554113,0.0005695194,0.0003457445,0.0008407884],"domain_scores_gemma":[0.99844897,0.00023684185,0.00014302222,0.00088577915,0.000032924898,0.0002524515],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00019149554,0.0006716531,0.0007732879,0.0006978211,0.000112054404,0.00016601027,0.00051172305,0.0008144734,0.0014953793],"category_scores_gemma":[0.00010296858,0.00063801627,0.00012804907,0.00015103146,0.00008789693,0.000074228505,0.00008850718,0.00040190588,0.000019150553],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006296741,0.00006449112,0.0002852846,0.0003259761,0.0002790321,0.00004621095,0.00004053697,0.00024002485,0.000432027,0.001375494,0.9942567,0.0025912758],"study_design_scores_gemma":[0.0012083732,0.00064033223,0.0022876365,0.0020882667,0.00033915593,0.00036989548,0.000011006792,0.08736387,0.0016764363,0.00012582159,0.9014768,0.0024124065],"about_ca_topic_score_codex":0.00080985687,"about_ca_topic_score_gemma":0.0015455768,"teacher_disagreement_score":0.37106478,"about_ca_system_score_codex":0.0002651017,"about_ca_system_score_gemma":0.000074097494,"threshold_uncertainty_score":0.9996071},"labels":[],"label_agreement":null},{"id":"W7070870019","doi":"","title":"Projecting and Forecasting Stochastic Volatility Characteristics for the Nasdaq OMX Nordic/Baltic Financial Electricity Markets","year":2021,"lang":"en","type":"article","venue":"Duo Research Archive (University of Oslo)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volatility (finance); Stochastic volatility; Forward volatility; Implied volatility; Volatility swap; Volatility smile; Kalman filter; Quarter (Canadian coin); Mean reversion","score_opus":0.02925121051600285,"score_gpt":0.24112048030460875,"score_spread":0.2118692697886059,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7070870019","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3207343,0.00022478342,0.677487,0.00009013391,0.000096758165,0.0006471864,0.00008542399,0.00005284911,0.0005815495],"genre_scores_gemma":[0.9950342,0.000079705045,0.004625437,0.0000043665204,0.00006401914,0.0000047032886,0.00003392041,0.00001920331,0.00013440443],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99846727,0.00022270912,0.00018105336,0.00027809205,0.0003501355,0.00050072314],"domain_scores_gemma":[0.99639213,0.002770595,0.000074614094,0.00024173659,0.0004237761,0.00009716356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013237699,0.0001242027,0.00024725476,0.00021598555,0.00063285715,0.000039940907,0.00024412962,0.000066483575,0.000017050186],"category_scores_gemma":[0.0028985965,0.00013532546,0.00007252245,0.0006711564,0.00014982288,0.00014891662,0.00017103828,0.00044327177,0.0000016661998],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.004710116,0.00082036573,0.057165198,0.011243551,0.0018383401,0.00042819305,0.035331983,0.02290188,0.102489725,0.0064835367,0.0146807665,0.74190634],"study_design_scores_gemma":[0.0005223441,0.00008719635,0.06407983,0.00009428124,0.000026179223,0.00001844781,0.00046264305,0.9336919,0.00016417417,0.00041700015,0.00029928875,0.00013667367],"about_ca_topic_score_codex":0.00012622564,"about_ca_topic_score_gemma":0.00035156935,"teacher_disagreement_score":0.9107901,"about_ca_system_score_codex":0.00012646928,"about_ca_system_score_gemma":0.00024584253,"threshold_uncertainty_score":0.5518412},"labels":[],"label_agreement":null},{"id":"W7071034267","doi":"","title":"RE Royalties Provides $6.3 Million Financing for a 200 Megawatt Solar Project in Alberta, Canada","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Investment (military); Work (physics); Payment","score_opus":0.006302046186512186,"score_gpt":0.20016690633054007,"score_spread":0.19386486014402787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7071034267","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000019096213,0.012914396,0.022411834,0.00018188433,0.0024296795,0.0036879526,0.000094014336,0.00094146165,0.9573197],"genre_scores_gemma":[0.0035301875,0.00014782915,0.0028568383,0.000034258803,0.00019477055,0.0005312069,0.00007627082,0.00090289954,0.99172574],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988282,0.000017881503,0.00031257636,0.00031253244,0.00015881927,0.00036999345],"domain_scores_gemma":[0.9996113,0.00006370058,0.000050493385,0.0002257493,0.000020185451,0.00002855667],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010610373,0.0003137665,0.00036569487,0.00043118882,0.000014699323,0.000046604357,0.00013311963,0.0002605293,0.00009129901],"category_scores_gemma":[0.00005873804,0.0002932815,0.0000499267,0.00035265123,0.0000051403217,0.00004377426,0.00001579724,0.00017998653,0.00001872497],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002482777,0.0000031588845,0.000022770573,0.0023238831,0.000054435553,0.0000075620146,0.0001422861,0.0044510737,0.0000027522624,0.00005219482,0.9926243,0.0003131073],"study_design_scores_gemma":[0.00017839485,0.000023560084,0.0000014050745,0.0013023285,0.000030899522,0.000002647521,0.000086232794,0.09756762,0.00014857683,0.0000155257,0.90022326,0.00041955017],"about_ca_topic_score_codex":0.88071215,"about_ca_topic_score_gemma":0.9946864,"teacher_disagreement_score":0.11397427,"about_ca_system_score_codex":0.0005542925,"about_ca_system_score_gemma":0.0005322356,"threshold_uncertainty_score":0.99995196},"labels":[],"label_agreement":null},{"id":"W7072106512","doi":"","title":"Washington regulators receive proposed terms for Avista’s sale to Canadian utility","year":2018,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Legislation; Work (physics); Payment","score_opus":0.007130864201178315,"score_gpt":0.20788596578499016,"score_spread":0.20075510158381185,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7072106512","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000028984372,0.000058433616,0.04626405,0.00009102147,0.001419036,0.0020960378,0.00011267466,0.0010285929,0.9489012],"genre_scores_gemma":[0.008754638,0.0000073648234,0.012024952,0.00008643426,0.00044564522,0.00010011835,0.00019811072,0.00084962347,0.9775331],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99879646,0.000019100866,0.00023718002,0.00034633264,0.00013875545,0.00046217366],"domain_scores_gemma":[0.9990722,0.000015493764,0.000049166698,0.0004955499,0.00006146413,0.00030615894],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0001604665,0.0002912032,0.000308817,0.0004475736,0.000042404547,0.000055802095,0.00025175005,0.0003957408,0.001887812],"category_scores_gemma":[0.00005940998,0.00028561451,0.00006095848,0.00026089727,0.000016266871,0.000039001792,0.000011378659,0.000080064696,0.00034361795],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000031359841,0.0000032965918,0.000039433955,0.00017580159,0.000051380608,8.1094856e-7,0.00007661998,0.00008300171,0.000018559174,0.00009963964,0.99831706,0.0011312747],"study_design_scores_gemma":[0.00014927881,0.000047708036,0.000042542502,0.00016160356,0.000020151874,0.0000015268176,0.000007505488,0.007735778,0.0005170886,0.000025746644,0.99090564,0.0003854408],"about_ca_topic_score_codex":0.033761375,"about_ca_topic_score_gemma":0.37787253,"teacher_disagreement_score":0.34411117,"about_ca_system_score_codex":0.0006086823,"about_ca_system_score_gemma":0.00017090797,"threshold_uncertainty_score":0.9999596},"labels":[],"label_agreement":null},{"id":"W7072622672","doi":"","title":"Wind Power in Canada, Market Outlook to 2025, Update 2014 - Capacity, Generation","year":2015,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Power (physics); Investment (military); Boom; Electricity generation; Renewable energy","score_opus":0.008542654048550608,"score_gpt":0.18290370481305154,"score_spread":0.17436105076450092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7072622672","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00006974726,0.0006061831,0.009642001,0.00007561426,0.0017606479,0.00050513184,0.00009590628,0.00021129355,0.9870335],"genre_scores_gemma":[0.0068384106,0.00007202234,0.0024434512,0.00028515275,0.00030705144,0.000026165417,0.0002137041,0.00055268395,0.9892613],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988199,0.00004721911,0.00027660452,0.00025123675,0.0002979615,0.00030706514],"domain_scores_gemma":[0.9994267,0.0000074451737,0.00004424143,0.00033776156,0.000039435494,0.00014438119],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00017648563,0.00027043006,0.00030620222,0.00035675368,0.000008421355,0.000030668933,0.00017160017,0.00020641754,0.008415379],"category_scores_gemma":[0.000016510814,0.00028605774,0.000017355598,0.00026148345,0.0000035551461,0.000050561222,0.000024096993,0.00015421423,0.00041623958],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.71897e-7,0.0000029300825,0.000100043835,0.000023309789,0.000027433909,0.0000056082054,0.000021534705,0.018714374,0.000019488576,0.000015325915,0.9810036,0.00006537039],"study_design_scores_gemma":[0.00019058595,0.000009101961,0.00006118917,0.0000592797,0.000009308649,0.0000033486997,0.000007298658,0.033342417,0.000053983964,0.000002440739,0.965843,0.00041801468],"about_ca_topic_score_codex":0.6005371,"about_ca_topic_score_gemma":0.98313755,"teacher_disagreement_score":0.3826005,"about_ca_system_score_codex":0.0012260183,"about_ca_system_score_gemma":0.00044916396,"threshold_uncertainty_score":0.9999592},"labels":[],"label_agreement":null},{"id":"W7073808996","doi":"","title":"Value of pumped-storage hydro for wind power integration in the British Columbia hydroelectric system","year":2010,"lang":"en","type":"other","venue":"cIRcle (University of British Columbia)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"BC Hydro","keywords":"Wind power; Hydropower; Exclosure; Intellectualization; Scale (ratio); Production (economics)","score_opus":0.0030546862842751104,"score_gpt":0.14926630277082217,"score_spread":0.14621161648654707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7073808996","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6444346,0.004000967,0.049937487,0.000021835553,0.0027035885,0.0073642596,0.002367915,0.0012672327,0.28790215],"genre_scores_gemma":[0.9666952,0.0001712066,0.00061616354,0.0000074334034,0.000075844546,0.000007702544,0.0001677153,0.00025753342,0.032001235],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9982903,0.000121385216,0.0003565444,0.0004454696,0.00040164692,0.0003846403],"domain_scores_gemma":[0.9988371,0.000094184754,0.00036067708,0.0004990412,0.00013864058,0.00007033976],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000452637,0.000117192816,0.0006842686,0.00017540518,0.00016222722,0.0004033949,0.0007068726,0.0006855766,0.00015592015],"category_scores_gemma":[0.00004940234,0.00042940842,0.00021377132,0.0008591651,0.00011206055,0.00018795358,0.0000380176,0.00044064186,0.000007055973],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001463935,0.00035898664,0.0016664973,0.003912709,0.00042483912,0.00035870963,0.00072331144,0.0019102606,0.00069731637,0.000012046802,0.8020502,0.1878705],"study_design_scores_gemma":[0.014671059,0.0016322043,0.6011962,0.025015084,0.001626829,0.0023943859,0.006283785,0.26111242,0.000016475276,0.00030598242,0.08011154,0.0056340406],"about_ca_topic_score_codex":0.39281195,"about_ca_topic_score_gemma":0.8914586,"teacher_disagreement_score":0.72193867,"about_ca_system_score_codex":0.00026159786,"about_ca_system_score_gemma":0.00010042431,"threshold_uncertainty_score":0.99981576},"labels":[],"label_agreement":null},{"id":"W7084060017","doi":"10.6084/m9.figshare.29964686.v1","title":"Additional file 2 of NOURISH-US: a mixed-methods, randomized crossover study of a program designed to reduce the financial burden of food allergy","year":2025,"lang":"en","type":"article","venue":"Figshare","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Winnipeg; University of British Columbia; McGill University; University of Manitoba; Children's Hospital Research Institute of Manitoba","funders":"","keywords":"Food allergy; Food aid; Crossover study; Food and drug administration; Crossover","score_opus":0.010498561393261009,"score_gpt":0.26913048455834754,"score_spread":0.25863192316508654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7084060017","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000557683,0.00023186594,0.0011050259,0.000009833268,0.00011160586,0.0030726122,0.9924056,0.00011104928,0.0023947188],"genre_scores_gemma":[0.31812567,0.0000042270185,0.066056475,0.000049002327,0.0003290062,0.03890418,0.5747367,0.00013281772,0.0016619225],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99872595,0.00023691203,0.0005124952,0.00015365118,0.00020982498,0.00016115331],"domain_scores_gemma":[0.99688584,0.0023324601,0.00018174872,0.00027128097,0.00030016009,0.000028504579],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00014358298,0.0001385004,0.0004773607,0.00013467473,0.00003341198,0.00001693111,0.00027932497,0.00008663452,0.37314016],"category_scores_gemma":[0.0077350503,0.00011511982,0.00012701887,0.0007096767,0.000009584898,0.000050368446,0.00006660174,0.0000876288,0.000015880536],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00084428967,0.00012096424,4.635721e-8,0.00018169283,0.00018833428,4.935219e-7,0.000526957,0.024958385,0.000047005415,0.000004833981,0.96948236,0.0036446338],"study_design_scores_gemma":[0.077665344,0.0020548468,0.00061449193,0.010755908,0.00015253287,0.000006764665,0.0006918366,0.117850125,0.0150893405,0.00014761004,0.7741298,0.0008414094],"about_ca_topic_score_codex":0.0000133542735,"about_ca_topic_score_gemma":0.00001912693,"teacher_disagreement_score":0.4176689,"about_ca_system_score_codex":0.000034230317,"about_ca_system_score_gemma":0.00013009617,"threshold_uncertainty_score":0.92601365},"labels":[],"label_agreement":null},{"id":"W7084671977","doi":"10.5281/zenodo.17272123","title":"Carbon Taxation in India: A Policy Feasibility Study","year":2025,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Carbon tax; Enforcement; Government (linguistics); Revenue; Greenhouse gas; Order (exchange); Tax revenue; Baseline (sea)","score_opus":0.016138649541448814,"score_gpt":0.24852099527495897,"score_spread":0.23238234573351016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7084671977","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5757635,0.00015850147,0.009877214,0.000235863,0.00024349138,0.002211612,0.000035041638,0.0023275553,0.40914717],"genre_scores_gemma":[0.999023,0.000019849324,0.000051039253,0.000022364977,0.000043493215,1.6480081e-7,0.00015435964,0.00045133143,0.00023439308],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99863696,0.00030033736,0.0002952076,0.00027765054,0.00021061944,0.00027921086],"domain_scores_gemma":[0.9992951,0.000018137393,0.00006145564,0.0003771811,0.00018872062,0.00005938263],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006651537,0.00012127779,0.00014555798,0.0007182651,0.00034274906,0.0002496687,0.00044592805,0.000065285436,0.00030131012],"category_scores_gemma":[0.0007907832,0.00014318856,0.0000219561,0.0019331368,0.000027231084,0.00015125352,0.00024431018,0.00022756387,0.00029015366],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000844942,0.007676919,0.027759971,0.002878876,0.0011824075,0.00023279338,0.05614489,0.16904356,0.032898847,0.04750028,0.16539139,0.48844513],"study_design_scores_gemma":[0.008878798,0.0013170042,0.558955,0.00035957957,0.000093951465,0.00008513685,0.0034625614,0.17091477,0.00279366,0.0015029489,0.2501,0.0015365838],"about_ca_topic_score_codex":0.000076647026,"about_ca_topic_score_gemma":0.0000025758582,"teacher_disagreement_score":0.53119504,"about_ca_system_score_codex":0.0007361765,"about_ca_system_score_gemma":0.000007689715,"threshold_uncertainty_score":0.583906},"labels":[],"label_agreement":null},{"id":"W7084918131","doi":"10.6084/m9.figshare.30286912.v1","title":"Comprehensive Global Dataset of SARS-CoV-2 Lineages and Spike Mutations for Therapeutic and Vaccine Research (734 Cities, 2019 - 2025 Q1, n=9.4 Million Approx.)","year":2025,"lang":"en","type":"dataset","venue":"Figshare","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Spike (software development); Spike train; Mutation; Quarter (Canadian coin); Genomics; Feature (linguistics)","score_opus":0.08907422692893774,"score_gpt":0.36731139406957963,"score_spread":0.2782371671406419,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7084918131","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000008503275,0.015920144,0.00015848347,0.000029998862,0.00012699232,0.0013472947,0.98232824,0.000051393574,0.0000289819],"genre_scores_gemma":[0.000048071608,0.00088232325,0.0002505272,0.00005108915,0.00008833206,0.00035989328,0.9982559,0.00002152614,0.0000423398],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984196,0.00009724884,0.00045848332,0.000410096,0.00026936867,0.0003452494],"domain_scores_gemma":[0.9982729,0.0006216905,0.00012462442,0.000543453,0.00038886635,0.00004846916],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000119800585,0.00031821805,0.0004901594,0.00035059455,0.00011159767,0.000099091274,0.0003291442,0.00035974462,0.000401602],"category_scores_gemma":[0.00029039136,0.00033226388,0.000043824977,0.00060924573,0.000016430417,0.00013221733,0.00018910358,0.0003258361,0.000015060702],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018333732,0.000017142842,0.0000014484218,0.0052580703,0.00014206684,0.000003440231,0.00001289598,0.00033025508,0.000039202932,0.000003267534,0.99373144,0.00044245503],"study_design_scores_gemma":[0.00057416875,0.00009699921,0.000039120267,0.0019532812,0.000080941325,0.000010783667,0.000021296895,0.008774705,0.00032020322,0.000028055108,0.9878331,0.0002673664],"about_ca_topic_score_codex":0.00010130074,"about_ca_topic_score_gemma":0.00011022468,"teacher_disagreement_score":0.01592769,"about_ca_system_score_codex":0.00010597408,"about_ca_system_score_gemma":0.00013255228,"threshold_uncertainty_score":0.9999129},"labels":[],"label_agreement":null},{"id":"W7086646392","doi":"","title":"Wind and solar energy curtailment: A review of international experience","year":2016,"lang":"en","type":"article","venue":"RePEc: Research Papers in Economics","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Renewable energy; Wind power; Variable renewable energy; Solar energy; Photovoltaic system; Intermittent energy source; Grid parity; Energy development","score_opus":0.011401241735786855,"score_gpt":0.26319251361617585,"score_spread":0.25179127188038897,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7086646392","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4361737,0.06008939,0.0056285216,0.0019466515,0.0020404363,0.0017401874,0.0000828158,0.00031388816,0.49198443],"genre_scores_gemma":[0.74851346,0.25081167,0.00021494325,0.000024438981,0.000027946022,0.00003066777,0.0000025646339,0.000015616826,0.00035868495],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992197,0.000039457304,0.00028006043,0.000157236,0.000110624496,0.00019292322],"domain_scores_gemma":[0.9995415,0.00014216948,0.000034115274,0.00018694546,0.00004563364,0.0000496076],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038915352,0.00006768886,0.00013841494,0.00014175207,0.000015999061,0.00001057711,0.0001665218,0.00004184911,0.00007068891],"category_scores_gemma":[0.00021419358,0.000058534526,0.000020788011,0.00008571447,0.000056095625,0.00014775376,0.000051200142,0.000063062136,0.0000015597249],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022209295,0.000046078927,0.0091942195,0.0008625721,0.00008565624,0.000009587169,0.00046448933,0.0016318324,0.0065148617,0.0017048105,0.0002818824,0.9791818],"study_design_scores_gemma":[0.004124709,0.0003969772,0.008319637,0.027478198,0.000019163548,0.00013905688,0.00057358417,0.1567354,0.04071662,0.0006259452,0.7593387,0.0015320447],"about_ca_topic_score_codex":0.0000061318297,"about_ca_topic_score_gemma":0.000006631521,"teacher_disagreement_score":0.97764975,"about_ca_system_score_codex":0.00020797487,"about_ca_system_score_gemma":0.00003216095,"threshold_uncertainty_score":0.23869687},"labels":[],"label_agreement":null},{"id":"W7093512523","doi":"","title":"Solar, Wind Projects Could Fail Under New Alberta Grid Regulations","year":2024,"lang":"en","type":"other","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Grid; Power grid; Wind power; Government (linguistics)","score_opus":0.011458897421276537,"score_gpt":0.2156415007981875,"score_spread":0.20418260337691096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7093512523","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[6.235973e-7,0.0026600447,0.075904325,0.00016658178,0.00199315,0.00051690557,0.000011187886,0.0014828664,0.91726434],"genre_scores_gemma":[0.0005423532,0.00009091441,0.0019994767,0.000042459455,0.00080836896,0.000014486432,0.000116919655,0.0010561144,0.9953289],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989557,0.000014674129,0.00023545044,0.00031109853,0.00020871707,0.00027432205],"domain_scores_gemma":[0.99940866,0.000026774163,0.000043307584,0.00041421497,0.00001582482,0.00009121447],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000044939585,0.00031718245,0.00026849366,0.00038859417,0.000015948379,0.00010113774,0.00015483634,0.0004594215,0.003166166],"category_scores_gemma":[0.000012911419,0.00030203548,0.000071618924,0.00046875677,0.000009771152,0.00006730681,0.000024850622,0.00024915478,0.0023868298],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[4.1092017e-7,0.0000034831394,0.0000038527123,0.00016643535,0.00017002113,0.0000019654778,0.00009447009,0.010394317,0.000012195778,0.0013001834,0.987721,0.00013162069],"study_design_scores_gemma":[0.0001592983,0.000012890996,0.000005737236,0.00035586444,0.00009602365,0.000013837764,0.000018388933,0.02430341,0.000050784292,0.00013903333,0.9743982,0.0004465608],"about_ca_topic_score_codex":0.0014708987,"about_ca_topic_score_gemma":0.0033263385,"teacher_disagreement_score":0.07806459,"about_ca_system_score_codex":0.00014190872,"about_ca_system_score_gemma":0.00011390097,"threshold_uncertainty_score":0.9999432},"labels":[],"label_agreement":null},{"id":"W7094195873","doi":"","title":"New Electricity: Generation, Pricing, Wheeling &amp; Regulation","year":2002,"lang":"","type":"article","venue":"Case Western Reserve University School of Law Scholarly Commons (Case Western Reserve University)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wheeling; Work (physics); State (computer science); Production (economics); Process (computing)","score_opus":0.04522757773995177,"score_gpt":0.2231383862056575,"score_spread":0.17791080846570573,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7094195873","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86562395,0.002569021,0.11392045,0.00067701103,0.00082261395,0.00221841,0.00033404792,0.0007358929,0.013098581],"genre_scores_gemma":[0.93173575,0.00082400226,0.0045952336,0.000081379665,0.0004964145,0.0000011376704,0.00025362943,0.00026499882,0.061747458],"study_design_codex":"case_report","study_design_gemma":"not_applicable","domain_scores_codex":[0.99002886,0.0025089132,0.0018311025,0.0020635808,0.001631233,0.0019363196],"domain_scores_gemma":[0.9895069,0.0006500505,0.0015088014,0.0035450642,0.0025320898,0.0022570991],"candidate_categories":["metaepi_narrow","sts","scholarly_communication","research_integrity","insufficient_payload"],"consensus_categories":["metaepi_narrow","scholarly_communication","research_integrity"],"category_scores_codex":[0.0014269955,0.001576227,0.0018361823,0.004024193,0.0022820244,0.00171074,0.002593583,0.0016078573,0.0011339461],"category_scores_gemma":[0.0005356444,0.0022535312,0.00089480705,0.0061994875,0.00033762073,0.014177832,0.0014586624,0.0031217462,0.0005277862],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022384413,0.0024362854,0.35213068,0.0034214463,0.0054202788,0.35572606,0.0073564053,0.21474327,0.012153987,0.014579287,0.026470538,0.003323313],"study_design_scores_gemma":[0.051859252,0.005125312,0.010086224,0.0073660165,0.010883331,0.09965835,0.005009949,0.2701376,0.009243422,0.00022277146,0.5139919,0.016415862],"about_ca_topic_score_codex":0.020129535,"about_ca_topic_score_gemma":0.117727004,"teacher_disagreement_score":0.48752135,"about_ca_system_score_codex":0.0037852805,"about_ca_system_score_gemma":0.0005301116,"threshold_uncertainty_score":0.99977916},"labels":[],"label_agreement":null},{"id":"W7095271146","doi":"","title":"Prepared by:","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"","score_opus":0.0025051300306861857,"score_gpt":0.1625987751698978,"score_spread":0.1600936451392116,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7095271146","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019222524,0.0016561225,0.45636728,0.000014865447,0.00058905553,0.00011372563,0.0000013338857,0.0011478807,0.5208872],"genre_scores_gemma":[0.99684834,0.000008001446,0.0012180761,0.00001313135,0.000033954853,0.0000062079143,0.000003987452,0.000010002227,0.0018582988],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99976915,0.0000037589562,0.000049097478,0.000023217091,0.000036844835,0.000117903124],"domain_scores_gemma":[0.9998882,0.000006006501,0.0000033399417,0.00006430727,0.00000445877,0.000033712942],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000037603873,0.000031918687,0.00003133035,0.0000136805265,0.0000064802925,0.0000051051547,0.000026173153,0.000020322674,0.0001361519],"category_scores_gemma":[0.000003933366,0.000030035739,0.0000069680027,0.000066073844,0.0000011794831,0.00010747215,0.0000026790556,0.000015774554,0.00014228627],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001051958,0.00002400711,0.005599473,0.000029786252,0.000034607634,1.3596218e-7,0.00043495785,0.0067223064,0.011407607,0.0012035627,0.97140074,0.0031417836],"study_design_scores_gemma":[0.0005278647,0.000030506371,0.001672299,0.000014970144,0.000023094542,0.00002329119,0.00005713941,0.35447213,0.14431934,0.000038656668,0.49816376,0.00065695826],"about_ca_topic_score_codex":0.0000022100783,"about_ca_topic_score_gemma":3.8045027e-7,"teacher_disagreement_score":0.9776258,"about_ca_system_score_codex":0.000023916353,"about_ca_system_score_gemma":0.0000010866215,"threshold_uncertainty_score":0.18288496},"labels":[],"label_agreement":null},{"id":"W7095309776","doi":"","title":"Pricing Electricity Calls 1","year":2000,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Power (physics); Electricity pricing; Mains electricity; Electricity market","score_opus":0.00313736938002258,"score_gpt":0.16950408907994174,"score_spread":0.16636671969991917,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7095309776","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09421057,0.00024767002,0.20885113,0.00001799858,0.00010330276,0.00014541374,3.3244754e-7,0.0012610821,0.69516253],"genre_scores_gemma":[0.994134,0.00013543111,0.0018133674,0.000047993166,0.00003845627,0.000005776106,0.0000019200231,0.00001866021,0.0038043754],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99954414,0.000008646637,0.00011353601,0.000074777265,0.00008023833,0.00017868265],"domain_scores_gemma":[0.9998267,0.000023280569,0.0000049603846,0.000102973594,0.0000075117428,0.000034562734],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000056853165,0.00006713556,0.00007246673,0.00004634713,0.000021923304,0.000016366932,0.000061724466,0.000039223993,0.0013026758],"category_scores_gemma":[0.0000068848317,0.00006479503,0.000017717373,0.0003225463,0.0000024050898,0.0000816579,0.0000017067437,0.00006023997,0.00034275212],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007104884,0.00003869515,0.0008424928,0.00006263413,0.00007070404,0.0000111206145,0.000307487,0.60431075,0.0072011244,0.000873895,0.025841342,0.36043262],"study_design_scores_gemma":[0.00019882682,0.000026430074,0.00072681485,0.000008916712,0.000007835667,0.000019982474,0.0000026902783,0.9467696,0.019806294,0.000058759673,0.032132745,0.00024113258],"about_ca_topic_score_codex":0.00002007156,"about_ca_topic_score_gemma":0.0000051828883,"teacher_disagreement_score":0.89992344,"about_ca_system_score_codex":0.00006397021,"about_ca_system_score_gemma":0.0000059018435,"threshold_uncertainty_score":0.99961025},"labels":[],"label_agreement":null},{"id":"W7095903816","doi":"","title":"We are pleased to submit the enclosed report The Relationship between Competitive","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Restructuring; Task force; Task (project management); Electric power industry; Power (physics)","score_opus":0.018349787801046784,"score_gpt":0.22113338354961132,"score_spread":0.20278359574856453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7095903816","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20518978,0.0004680871,0.48596883,0.011925168,0.0005965181,0.0020188843,0.00002804563,0.0014294852,0.2923752],"genre_scores_gemma":[0.9953784,0.0000012878562,0.00047198773,0.0000591556,0.00018748958,0.00004605702,0.000030399937,0.000023942772,0.0038013193],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991244,0.00006706184,0.0002900297,0.00013103784,0.0002025485,0.00018492885],"domain_scores_gemma":[0.99880916,0.000681706,0.00005820995,0.00036329383,0.0000529486,0.000034658962],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030479868,0.00011097563,0.00011493539,0.000056572346,0.00014468492,0.000051523682,0.00017719711,0.00005474756,0.00003601431],"category_scores_gemma":[0.0001680538,0.00006739502,0.000041747695,0.0005014134,0.000015860363,0.00006209213,0.000016047567,0.00014443297,0.000112349335],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000050808717,0.000017165286,0.8089775,0.00003432811,0.00006212385,0.00003293768,0.00064356555,0.10215468,0.00012704177,0.039734658,0.048031773,0.00017913042],"study_design_scores_gemma":[0.0002079411,0.000015726464,0.9714719,0.000048923335,0.00004019449,0.000028994762,0.0003123371,0.006864567,0.0010211138,0.00090399093,0.018849654,0.00023465737],"about_ca_topic_score_codex":0.00011627938,"about_ca_topic_score_gemma":0.00023919539,"teacher_disagreement_score":0.7901886,"about_ca_system_score_codex":0.0000953072,"about_ca_system_score_gemma":0.000017464321,"threshold_uncertainty_score":0.2748289},"labels":[],"label_agreement":null},{"id":"W7096206764","doi":"","title":"Public Centralized Forecasting Registration and Communication Requirements for Distribution Connected Variable Generators","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Variable (mathematics); Subject matter; Electricity; Subject (documents); Distribution (mathematics); Subject-matter expert","score_opus":0.06753485790806127,"score_gpt":0.23439775823775982,"score_spread":0.16686290032969855,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096206764","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036588863,0.0005700495,0.9589799,0.00006731517,0.00022092312,0.0005163417,0.000020802574,0.00031683527,0.0027189713],"genre_scores_gemma":[0.9711428,0.000051225143,0.02753714,0.000012616196,0.000051848787,0.00008378851,0.0010442004,0.000018820945,0.00005753831],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992512,0.000043788143,0.00025043692,0.00008583871,0.00008454672,0.00028419838],"domain_scores_gemma":[0.99951386,0.0000685153,0.00006588625,0.00016680006,0.00010686131,0.000078046425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043226714,0.00009560735,0.000100218334,0.00003651238,0.00013116196,0.00007864075,0.00005960397,0.00007479012,0.000016666952],"category_scores_gemma":[0.00018867239,0.000100526835,0.000014423871,0.00021810042,0.000010059997,0.00064962986,0.000011445187,0.000042462903,0.0000011809741],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009747794,0.00034778417,0.045682658,0.0011303738,0.00058827834,3.6181694e-7,0.0013951034,0.022184737,0.057588827,0.77418387,0.072671555,0.024128973],"study_design_scores_gemma":[0.0010741035,0.000031203777,0.0006684967,0.000035572488,0.000040251347,0.000010558554,0.000047876114,0.97885966,0.008905352,0.00045064752,0.009607539,0.00026871686],"about_ca_topic_score_codex":0.0000140516395,"about_ca_topic_score_gemma":0.000008762374,"teacher_disagreement_score":0.95667493,"about_ca_system_score_codex":0.00015130454,"about_ca_system_score_gemma":0.00001285178,"threshold_uncertainty_score":0.40993655},"labels":[],"label_agreement":null},{"id":"W7096273899","doi":"","title":"Modelling Electricity Price Risk1","year":2003,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Electricity price; Power (physics); Mains electricity","score_opus":0.00818078894025679,"score_gpt":0.17865527047050694,"score_spread":0.17047448153025016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096273899","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005409036,0.00033161932,0.77547383,0.000002634627,0.0001100665,0.00008157396,1.632324e-7,0.0004245052,0.21816657],"genre_scores_gemma":[0.9784926,0.00008269518,0.02051487,0.000014293922,0.00001579877,0.000007867997,0.0000010310882,0.00002321566,0.00084758527],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994377,0.000020458096,0.00013474096,0.00009653792,0.00009515403,0.0002154256],"domain_scores_gemma":[0.99976397,0.000026070247,0.00001258107,0.00012697157,0.00002793614,0.00004245953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012893253,0.00008418034,0.0000848469,0.00007215059,0.000030143672,0.000019327095,0.000057019417,0.000051504652,0.000077273144],"category_scores_gemma":[0.000017772543,0.000084581996,0.000021873806,0.0004185873,0.0000023383327,0.00009770512,0.0000021249996,0.00008452003,0.0000808863],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[3.6573556e-7,0.0000050794247,0.00005251179,0.000008880775,0.000008994695,5.758628e-7,0.000025427698,0.99367505,0.00022363605,0.004970769,0.00090509246,0.0001236394],"study_design_scores_gemma":[0.00008266824,0.000007717939,0.0000031705679,0.0000026258836,0.0000039452207,0.000006370551,0.0000031191069,0.98529124,0.010202252,0.00021646528,0.004070893,0.00010954623],"about_ca_topic_score_codex":0.000010994865,"about_ca_topic_score_gemma":9.930556e-7,"teacher_disagreement_score":0.9730836,"about_ca_system_score_codex":0.00007796668,"about_ca_system_score_gemma":0.000012024972,"threshold_uncertainty_score":0.34491536},"labels":[],"label_agreement":null},{"id":"W7096327339","doi":"","title":"Offer Behaviour Enforcement Guidelines For Alberta’s Wholesale Electricity Market","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transparency (behavior); Enforcement; Context (archaeology); Electricity; Process (computing); Electricity market; Set (abstract data type)","score_opus":0.049670886230131606,"score_gpt":0.2552350295589628,"score_spread":0.20556414332883122,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096327339","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004962455,0.00019769534,0.73791367,0.000049137445,0.00048251238,0.00080258364,0.0000064418327,0.00043744044,0.25514808],"genre_scores_gemma":[0.9387393,0.000050298575,0.03196555,0.00017792976,0.00010388713,0.00021234686,0.000027138345,0.00007100932,0.02865254],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990056,0.000012309215,0.000372978,0.00016505283,0.00012364062,0.00032038757],"domain_scores_gemma":[0.99943054,0.000039998282,0.000035540314,0.0002209193,0.00020492263,0.00006807785],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00020418246,0.00016448664,0.00016601618,0.00010481819,0.000037817954,0.000017883895,0.00014886889,0.00008712859,0.0009856883],"category_scores_gemma":[0.000075261276,0.00015222668,0.00006822201,0.00017730713,0.000005569965,0.0001263224,0.000013777805,0.00005254428,0.00003438636],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007275312,0.00012268075,0.0071164877,0.00019754768,0.00020476509,0.000002626824,0.00062175293,0.00618535,0.0015975412,0.006090484,0.971087,0.006701031],"study_design_scores_gemma":[0.0013380748,0.0002614155,0.0025616607,0.0000498046,0.00012265373,0.000018750934,0.00005899329,0.8955005,0.059144404,0.00024983272,0.03986194,0.0008320077],"about_ca_topic_score_codex":0.00052260066,"about_ca_topic_score_gemma":0.00022291725,"teacher_disagreement_score":0.93377686,"about_ca_system_score_codex":0.00008765989,"about_ca_system_score_gemma":0.000019331115,"threshold_uncertainty_score":0.9999275},"labels":[],"label_agreement":null},{"id":"W7096563607","doi":"","title":"Prepared for the Independent Power Producers Society of Alberta (IPPSA),","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Power (physics); Government (linguistics); Production (economics); Work (physics)","score_opus":0.014920559841503494,"score_gpt":0.19823151030116962,"score_spread":0.1833109504596661,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096563607","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024798209,0.00069572806,0.8192841,0.00019764528,0.0013255862,0.0028329077,0.000007456071,0.000434739,0.15042362],"genre_scores_gemma":[0.99240136,0.000018602374,0.0052496437,0.000024990008,0.000017320843,0.000076606964,0.0000023421317,0.000023781306,0.0021853356],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99946845,0.000006909012,0.00017603714,0.00010587963,0.00009743279,0.0001453137],"domain_scores_gemma":[0.99955946,0.00007058232,0.000033433036,0.0002593345,0.000055790664,0.000021394893],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001587351,0.00007963492,0.000092589864,0.000016445581,0.000025673324,0.0000065454533,0.00014692298,0.00005283344,0.00013721338],"category_scores_gemma":[0.00002448932,0.000054948337,0.00007738584,0.00011431509,0.000012052247,0.000071745846,0.000014321144,0.000040622253,0.000005648368],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000223007,0.00043053293,0.008522076,0.0013306347,0.0034669254,7.092252e-7,0.13044313,0.12039066,0.020558257,0.012615961,0.6953989,0.0066191647],"study_design_scores_gemma":[0.0018090925,0.00033245407,0.0044595087,0.000065759436,0.00018598557,0.000015946323,0.0019384677,0.74664897,0.21988714,0.00032454598,0.023572652,0.0007595089],"about_ca_topic_score_codex":0.00014811478,"about_ca_topic_score_gemma":0.00006549664,"teacher_disagreement_score":0.96760315,"about_ca_system_score_codex":0.00003904868,"about_ca_system_score_gemma":0.000018704966,"threshold_uncertainty_score":0.22407283},"labels":[],"label_agreement":null},{"id":"W7096567348","doi":"","title":"Hydro One Toronto Hydro","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hydroelectricity; Value (mathematics); Market value; Generator (circuit theory)","score_opus":0.003721416879748225,"score_gpt":0.16981641977545878,"score_spread":0.16609500289571055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096567348","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0124875605,0.001134956,0.16703863,0.000026842994,0.00025751823,0.00012318698,9.099666e-7,0.0010011798,0.8179292],"genre_scores_gemma":[0.99147975,0.000019532043,0.0029664247,0.000017479335,0.00012056102,0.000009959647,0.000009928005,0.000024643807,0.005351721],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994951,0.0000068014947,0.00014270289,0.0000855672,0.00010195419,0.00016790767],"domain_scores_gemma":[0.99979025,0.00001207639,0.000010185991,0.00014796978,0.000012734905,0.00002679831],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000047850175,0.000078215555,0.000087855275,0.000020632715,0.000017905324,0.000018951538,0.000066593704,0.000049189424,0.00038373558],"category_scores_gemma":[0.0000028830357,0.00008237318,0.000021637508,0.00008469527,0.0000033181434,0.00015366152,0.0000062059034,0.000030758052,0.00013836926],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000066928383,0.00014944079,0.0011581248,0.00014140547,0.00011391421,0.000011908679,0.0001847566,0.74887127,0.047753107,0.021267071,0.1739358,0.0064065224],"study_design_scores_gemma":[0.0005730867,0.00004763303,0.0013054056,0.000026141126,0.000023896939,0.000013464518,0.00001557401,0.9076841,0.05480057,0.0004885642,0.034480043,0.00054151396],"about_ca_topic_score_codex":0.000890124,"about_ca_topic_score_gemma":0.001009653,"teacher_disagreement_score":0.97899216,"about_ca_system_score_codex":0.00016864676,"about_ca_system_score_gemma":0.000004428532,"threshold_uncertainty_score":0.42016354},"labels":[],"label_agreement":null},{"id":"W7096762993","doi":"","title":"Description","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Legislation; Legislature; Government (linguistics); Anticipation (artificial intelligence); Electricity; Electricity market","score_opus":0.023605808202282603,"score_gpt":0.15486581773528757,"score_spread":0.13126000953300496,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096762993","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008053414,0.00004421449,0.552913,9.39706e-7,0.0001803533,0.00002909487,6.23666e-8,0.00042414974,0.4383548],"genre_scores_gemma":[0.9913512,0.0000066458665,0.007945602,0.000007629038,0.000010377278,0.0000035051712,6.6419227e-7,0.000007102822,0.00066730106],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998451,0.0000025761572,0.000045730398,0.000027007587,0.00002436017,0.00005525743],"domain_scores_gemma":[0.99992293,0.0000012477047,0.0000027389513,0.0000521652,0.000007266168,0.000013651739],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000022673836,0.000025499095,0.000023136978,0.00002636602,0.000005711635,0.0000038239873,0.000024883153,0.000017010922,0.000250196],"category_scores_gemma":[0.0000017478332,0.000024222083,0.0000066296498,0.00006745167,0.0000014752924,0.00008049684,0.0000016084346,0.000015578218,0.00015674141],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044089313,0.00029320747,0.05598131,0.0004976024,0.00045450026,0.00005304643,0.018212322,0.066225894,0.12563725,0.24580498,0.3285914,0.1582044],"study_design_scores_gemma":[0.0004977562,0.00008855757,0.022407519,0.000023859362,0.000022219798,0.00004010384,0.00011234101,0.83516335,0.13002771,0.001915019,0.0091129,0.000588694],"about_ca_topic_score_codex":0.000007938051,"about_ca_topic_score_gemma":0.0000035527469,"teacher_disagreement_score":0.98329777,"about_ca_system_score_codex":0.000015469474,"about_ca_system_score_gemma":0.0000011640285,"threshold_uncertainty_score":0.27394706},"labels":[],"label_agreement":null},{"id":"W7096776496","doi":"","title":"Stakeholder Advisory Committee Terms of Reference Discussion Paper","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Stakeholder; Section (typography); Process (computing); Advisory committee; Stakeholder analysis; Stakeholder engagement; Plan (archaeology)","score_opus":0.027843127277149684,"score_gpt":0.2180728208530005,"score_spread":0.19022969357585082,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096776496","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.082159415,0.0009925552,0.20345157,0.00016336066,0.0011378519,0.00050582,0.000012374288,0.00096258445,0.71061444],"genre_scores_gemma":[0.99670017,0.000025812096,0.0014623473,0.00002171123,0.000032231274,0.000007722535,0.0000083995155,0.000019418496,0.0017222107],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99943215,0.000020784422,0.0001823681,0.000058420705,0.000116024865,0.00019023124],"domain_scores_gemma":[0.9996825,0.000019373983,0.000024491908,0.00020619537,0.000014567127,0.000052890504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000105125815,0.00008447376,0.000110850546,0.000049371447,0.00001544154,0.000005673866,0.00008332349,0.000058533802,0.00034964498],"category_scores_gemma":[0.000009126929,0.000052126125,0.000018588893,0.00012400275,0.000009021314,0.0002988801,0.0000153545,0.000071782015,0.000045573146],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054727883,0.0007679659,0.24855636,0.0016655023,0.00038226417,0.0000040939594,0.009256761,0.048682027,0.3097564,0.035569213,0.20284337,0.14246133],"study_design_scores_gemma":[0.004298643,0.0004269974,0.38227767,0.0008794702,0.00022633755,0.00007116526,0.0016077327,0.11096502,0.2396893,0.001033386,0.25485834,0.0036659315],"about_ca_topic_score_codex":0.000004969888,"about_ca_topic_score_gemma":0.0000038379467,"teacher_disagreement_score":0.9145407,"about_ca_system_score_codex":0.000028761751,"about_ca_system_score_gemma":0.0000031233114,"threshold_uncertainty_score":0.38283673},"labels":[],"label_agreement":null},{"id":"W7096902185","doi":"","title":"Network Methods for Head-dependent Hydro Power Scheduling","year":2007,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bounding overwatch; Electricity; Hydroelectricity; Nonlinear system; Power (physics); Electricity generation; Scheduling (production processes); Hydro power; Power flow","score_opus":0.015816773267626264,"score_gpt":0.3098507796414498,"score_spread":0.29403400637382354,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096902185","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012180279,0.00091162365,0.9611201,0.000025894138,0.0010585043,0.00032106086,4.363541e-7,0.0005604753,0.03478382],"genre_scores_gemma":[0.40260407,0.0000066469624,0.5965635,0.00007833075,0.000149989,0.000015928317,0.0000036477197,0.00004047732,0.0005373795],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902004,0.000022612143,0.00028618096,0.00014889408,0.00008808348,0.00043418328],"domain_scores_gemma":[0.9994311,0.00023894738,0.000026221342,0.00018208828,0.0000448181,0.00007684494],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013682187,0.00012570241,0.00015854309,0.00007458347,0.00005207581,0.000027964183,0.000103840306,0.000104028804,0.00007215469],"category_scores_gemma":[0.000051515904,0.00012548667,0.00005082839,0.00025881283,0.0000046393175,0.000092430026,0.000013008833,0.00009210911,0.000020696267],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000149104835,0.000011729132,0.00015165345,0.000038529437,0.000059018348,0.0000017374401,0.000100322555,0.9728097,0.0034370075,0.0039311256,0.001704648,0.017739631],"study_design_scores_gemma":[0.00056339044,0.00007139483,0.00011069261,0.000033914363,0.000023663928,0.000016815497,0.000037129903,0.9549375,0.024492048,0.0010359236,0.018290251,0.00038727265],"about_ca_topic_score_codex":0.000004191474,"about_ca_topic_score_gemma":0.000010535423,"teacher_disagreement_score":0.40138605,"about_ca_system_score_codex":0.00010684558,"about_ca_system_score_gemma":0.00001006741,"threshold_uncertainty_score":0.51171976},"labels":[],"label_agreement":null},{"id":"W7096904462","doi":"","title":"Occupational exposures and non-Hodgkin&amp;apos;s lymphoma: Canadian case-control study","year":2008,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Attribution; License; Clothing; Data collection; Occupational exposure","score_opus":0.028171595612993094,"score_gpt":0.2501562704813216,"score_spread":0.2219846748683285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096904462","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9727952,0.00023197665,0.019505529,0.000017128046,0.00023506292,0.0005144456,0.000023833207,0.00019622614,0.0064806147],"genre_scores_gemma":[0.99836195,0.0000085945185,0.0010697683,0.000052674033,0.00006631827,0.000041566025,0.0000072480325,0.000027520447,0.0003643611],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991878,0.00003214535,0.0002145774,0.00016514077,0.00013935282,0.00026094067],"domain_scores_gemma":[0.9995032,0.00006170445,0.000018384319,0.00017539314,0.00005738502,0.00018392532],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012341463,0.00014402329,0.00015762853,0.00020819441,0.00016206357,0.000030343304,0.00006391245,0.00006695027,0.00010321956],"category_scores_gemma":[0.000024578203,0.00014406632,0.000020645999,0.00020718202,0.000013753947,0.00013607477,0.0000060364714,0.00004418514,0.000037942307],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037267793,0.0001685069,0.8787375,0.000047959726,0.00046143343,0.0027547916,0.005875739,0.076340124,0.00029094997,0.000108989916,0.02910246,0.00607424],"study_design_scores_gemma":[0.005125661,0.00023560387,0.83758765,0.000013214406,0.000080229605,0.0069132233,0.00038664893,0.14625849,0.00014166108,0.000010201141,0.0024446337,0.00080276333],"about_ca_topic_score_codex":0.045380797,"about_ca_topic_score_gemma":0.23005287,"teacher_disagreement_score":0.18467209,"about_ca_system_score_codex":0.00016893054,"about_ca_system_score_gemma":0.00014352865,"threshold_uncertainty_score":0.9609761},"labels":[],"label_agreement":null},{"id":"W7096917445","doi":"","title":"18-Month Outlook Executive Summary","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Executive summary; Mains electricity; Service (business); Electricity market; Reliability (semiconductor); Demand forecasting","score_opus":0.011558824889582767,"score_gpt":0.18510863137161415,"score_spread":0.1735498064820314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7096917445","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0004287911,0.0012111997,0.07087632,0.000034671426,0.000289906,0.00012880712,0.0000016363168,0.00073265744,0.926296],"genre_scores_gemma":[0.91912854,0.00021126618,0.0026060292,0.0000833906,0.00008607633,0.000022293405,0.000007261926,0.000045882403,0.07780925],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99949735,0.0000111313275,0.00012595279,0.00009486778,0.00009334821,0.00017737168],"domain_scores_gemma":[0.9997535,0.000022207312,0.0000106185125,0.00014881715,0.000019129659,0.000045765653],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003891185,0.00009014918,0.00009463739,0.00006410736,0.000021698197,0.000018287783,0.00007730828,0.000051228304,0.0006579395],"category_scores_gemma":[0.000009670113,0.000087568915,0.000026448699,0.00017859621,0.00000606863,0.00012067983,0.000008790716,0.0000644855,0.00031587298],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000015875445,0.00002555626,0.0005379778,0.00003015073,0.000051107574,0.00001293977,0.00039304953,0.029191265,0.00043838858,0.00070125435,0.964448,0.0041687484],"study_design_scores_gemma":[0.0003575188,0.000038373506,0.0001566186,0.000025262156,0.000013240815,0.000012961979,0.000045953326,0.93380487,0.0035025647,0.00004511878,0.061688915,0.00030860738],"about_ca_topic_score_codex":0.0000088532315,"about_ca_topic_score_gemma":0.0000075955727,"teacher_disagreement_score":0.91869974,"about_ca_system_score_codex":0.000066702305,"about_ca_system_score_gemma":0.0000019936735,"threshold_uncertainty_score":0.72039765},"labels":[],"label_agreement":null},{"id":"W7097501063","doi":"","title":"Western Interconnection","year":2013,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Interconnection; Work (physics); Key (lock); Electric utility","score_opus":0.00312021321208994,"score_gpt":0.15725748129223,"score_spread":0.15413726808014006,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097501063","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24336497,0.00011500387,0.6788104,0.000045098168,0.00065343204,0.00015058713,8.716627e-8,0.0009302161,0.075930186],"genre_scores_gemma":[0.99845135,0.0000041013564,0.0006101949,0.000022355936,0.000040672083,0.000018947208,0.0000011316138,0.000009842176,0.0008413986],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997937,0.000004032545,0.00006144686,0.000029876359,0.000027812997,0.000083102015],"domain_scores_gemma":[0.9998994,0.0000066174,0.000003877027,0.000055913624,0.000011553656,0.00002262779],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000018841709,0.000035116173,0.000032436652,0.000032262753,0.00000632869,0.0000180109,0.000025285468,0.000021562002,0.0004575004],"category_scores_gemma":[0.0000023525251,0.00003222592,0.000008339462,0.00006739313,0.0000012995813,0.00020066812,0.0000032295452,0.000024143623,0.001327985],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000043511127,0.00014253228,0.14847709,0.00044674156,0.0003586978,0.0000026271384,0.005657443,0.2075877,0.121200405,0.005765239,0.26322964,0.24712752],"study_design_scores_gemma":[0.00040274623,0.000052089163,0.03080191,0.000032138978,0.000014371134,0.000053533815,0.00024395758,0.9151718,0.041773863,0.00018418355,0.010718954,0.00055043254],"about_ca_topic_score_codex":0.000033805347,"about_ca_topic_score_gemma":0.0000067101796,"teacher_disagreement_score":0.75508636,"about_ca_system_score_codex":0.000026501953,"about_ca_system_score_gemma":7.002111e-7,"threshold_uncertainty_score":0.9994496},"labels":[],"label_agreement":null},{"id":"W7097522794","doi":"","title":"40 | Fourth Quarter 2013 Politics of Power in China: Institutional Bottlenecks to Reducing Wind Curtailment Through Improved Transmission","year":2015,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; China; Renewable energy; Quarter (Canadian coin); Electricity; Nameplate capacity; Power grid","score_opus":0.009194655371121565,"score_gpt":0.22265542194746266,"score_spread":0.21346076657634108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097522794","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25165415,0.00046982578,0.7062886,0.00074299634,0.0007464619,0.0006666115,0.000009319473,0.00018696056,0.03923508],"genre_scores_gemma":[0.97928953,0.000015610027,0.020198386,0.00003750785,0.000043307897,0.000010733096,0.000011069785,0.000023337385,0.00037050573],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988622,0.0000258475,0.00041213105,0.00017784005,0.00022612028,0.00029584306],"domain_scores_gemma":[0.9995578,0.000013646819,0.00003245177,0.00019361395,0.00006694879,0.00013554715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017684563,0.00015727157,0.00021086837,0.00014825171,0.000025858733,0.000016052174,0.0001127037,0.00009939459,0.0000671532],"category_scores_gemma":[0.000019072808,0.00014575377,0.000037761005,0.00031109675,0.000013955773,0.00026599696,0.000013809593,0.00011521431,0.000019878344],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044085642,0.00014875407,0.00040175163,0.00011382923,0.000051025916,0.0000052244604,0.009624359,0.9595874,0.011654406,0.0024583498,0.015197602,0.00071322464],"study_design_scores_gemma":[0.00404352,0.00079869566,0.00535137,0.0005989081,0.00003990077,0.000041941425,0.0008594024,0.9292021,0.03640982,0.0009481962,0.020633755,0.0010723941],"about_ca_topic_score_codex":0.0005520792,"about_ca_topic_score_gemma":0.000023391485,"teacher_disagreement_score":0.7276354,"about_ca_system_score_codex":0.00029788175,"about_ca_system_score_gemma":0.000104302926,"threshold_uncertainty_score":0.5943666},"labels":[],"label_agreement":null},{"id":"W7097704016","doi":"","title":"THE UNIVERSITY OF CALGARY Stochastic Models for Natural Gas and Electricity Prices","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Natural gas; Spot contract; Electricity price; Stochastic modelling; Volatility (finance); Natural gas prices; Electricity generation","score_opus":0.0033319072758991033,"score_gpt":0.15464381924709253,"score_spread":0.15131191197119342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097704016","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016766198,0.0012893757,0.97839326,0.000014194718,0.000045587803,0.00019213553,8.67791e-7,0.00007508821,0.003223299],"genre_scores_gemma":[0.99630296,0.000029035224,0.0032598758,0.0000014780583,0.00000912473,8.626535e-7,0.0000026652801,0.000005908331,0.00038808692],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971753,0.0000057982115,0.000065326436,0.000056067565,0.000050233055,0.000105043604],"domain_scores_gemma":[0.9997663,0.000113917704,0.000018169443,0.00005536317,0.000035083744,0.000011165719],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006305121,0.000046774843,0.00006453251,0.000026303582,0.00006681917,0.000007708859,0.00005591191,0.000025446912,7.5020273e-7],"category_scores_gemma":[0.0000062928643,0.00003736929,0.000016410508,0.00010708396,0.000012777362,0.00007733646,0.0000066145517,0.0000343331,2.622056e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031316915,0.00001082653,0.000036845293,0.00006894504,0.000038746814,4.1412505e-7,0.000092838134,0.9566144,0.0014037163,0.03554051,0.0021001834,0.0040612873],"study_design_scores_gemma":[0.00014738625,0.000013545367,0.00014201296,0.0000033384388,0.0000097284865,0.0000016204691,0.000008984237,0.9983401,0.00040142392,0.000800177,0.00008604539,0.00004567506],"about_ca_topic_score_codex":0.00011852119,"about_ca_topic_score_gemma":0.00012304581,"teacher_disagreement_score":0.9795368,"about_ca_system_score_codex":0.000031933592,"about_ca_system_score_gemma":0.00000824207,"threshold_uncertainty_score":0.15238754},"labels":[],"label_agreement":null},{"id":"W7097942486","doi":"","title":"Public Market Entry: A Step-by-Step Guide","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Subject matter; Order (exchange); Subject (documents); Market research; Electricity; Market analysis","score_opus":0.016329024815464735,"score_gpt":0.18310566436881806,"score_spread":0.1667766395533533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097942486","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00009302086,0.00021814712,0.423109,0.00002241357,0.00021218933,0.000104928906,0.000002322414,0.0004922587,0.5757457],"genre_scores_gemma":[0.8336686,0.0002101172,0.07737216,0.0002031523,0.00010616337,0.00008330572,0.00003327583,0.00012933029,0.08819387],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991752,0.000029015488,0.00022862185,0.00013842844,0.00013296795,0.00029579332],"domain_scores_gemma":[0.9995558,0.000020546468,0.000023627868,0.00026094043,0.00004301881,0.00009604119],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00016849367,0.0001258013,0.00012125505,0.00008967037,0.000023547913,0.00003700832,0.00017391557,0.00008019422,0.0027087817],"category_scores_gemma":[0.000033225384,0.00012120694,0.000031170995,0.00027050579,0.000007386773,0.00021022178,0.000021271888,0.000070443806,0.00019459554],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019085985,0.000015672049,0.0007459037,0.000019843577,0.00003622588,0.0000023083292,0.00002798632,0.000024229292,0.00013990185,0.00077942753,0.9958251,0.002381478],"study_design_scores_gemma":[0.00043426646,0.000038348448,0.00035645076,0.000015853471,0.0000145376725,0.00001943963,0.000037064958,0.21401452,0.0021224685,0.000011481541,0.78259546,0.00034012168],"about_ca_topic_score_codex":0.000066737404,"about_ca_topic_score_gemma":0.0000235496,"teacher_disagreement_score":0.8335756,"about_ca_system_score_codex":0.00008647351,"about_ca_system_score_gemma":0.000014416888,"threshold_uncertainty_score":0.99820286},"labels":[],"label_agreement":null},{"id":"W7098013587","doi":"","title":"Integrating the Energy Markets in North-America: Conditions Helping Large-scale Integration of Wind Power? By","year":2011,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Electric power system; Intermittency; Revenue; Power (physics); Resource (disambiguation); Electricity generation; Order (exchange); Base load power plant","score_opus":0.006137618733553719,"score_gpt":0.18894366910278446,"score_spread":0.18280605036923073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7098013587","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1697608,0.000302459,0.76540303,0.000026667756,0.00023518897,0.00020440713,0.000031694337,0.00018190111,0.06385388],"genre_scores_gemma":[0.99736726,0.00004027628,0.0022465757,0.000048060883,0.000009715344,0.000023060005,0.00006870989,0.000022523589,0.00017381369],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991127,0.00006903784,0.0003696742,0.00012630483,0.000114816416,0.00020744778],"domain_scores_gemma":[0.99957305,0.00007425774,0.00007393393,0.00019274188,0.00005534759,0.000030655076],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001525144,0.00012854995,0.00016173028,0.00012934784,0.00004496309,0.000014226173,0.00014816504,0.00006156002,0.00022966924],"category_scores_gemma":[0.000040257182,0.00009903041,0.00003923978,0.00061925506,0.000024659286,0.00019707886,0.000017844268,0.00013140048,0.000005791462],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024011977,0.0022234435,0.1137838,0.00058097753,0.0012274942,0.00004640703,0.19263315,0.114400126,0.31169516,0.05732999,0.13827063,0.06756869],"study_design_scores_gemma":[0.00089349877,0.00016214486,0.023247289,0.00023170155,0.000040087656,0.00001743895,0.010327,0.8975351,0.06356341,0.0002061437,0.0030850489,0.00069113576],"about_ca_topic_score_codex":0.0002506017,"about_ca_topic_score_gemma":0.0015076734,"teacher_disagreement_score":0.8276065,"about_ca_system_score_codex":0.00007347097,"about_ca_system_score_gemma":0.000014607617,"threshold_uncertainty_score":0.40383428},"labels":[],"label_agreement":null},{"id":"W7099421477","doi":"","title":"Background The existing definition of MPWG Issue #7 (Imports and Exports Setting the Ontario Market","year":2009,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Allocative efficiency; Marginal cost; Production (economics); Market power; Investment (military); Market price; Competition (biology); Price mechanism; Perfect competition; Factor price","score_opus":0.0162005096544819,"score_gpt":0.2103027623627858,"score_spread":0.1941022527083039,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7099421477","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37558782,0.00086079567,0.025066921,0.0004721241,0.00033798438,0.0005145262,0.0000015613955,0.00025934883,0.5968989],"genre_scores_gemma":[0.9955742,0.000026205553,0.0034261257,0.00010652039,0.000051108203,0.000006196296,0.0000054328834,0.000012401612,0.0007918331],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.99926686,0.000034558,0.0002875057,0.00010694413,0.00013897158,0.00016517696],"domain_scores_gemma":[0.9995432,0.00013063056,0.00007531311,0.00020013195,0.000026707146,0.000024053454],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005066845,0.000107528474,0.00011083056,0.000033755325,0.00009685897,0.000045598696,0.00007686626,0.000046638113,0.0001565316],"category_scores_gemma":[0.000025115161,0.00006791119,0.000024432382,0.0001419291,0.00001627094,0.00011836809,0.00001277174,0.00011634142,0.0000021149267],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019231177,0.00041099387,0.14649463,0.0014530704,0.0009923577,0.00023241388,0.09842191,0.081348866,0.018167965,0.062576935,0.32202628,0.26768228],"study_design_scores_gemma":[0.0023551004,0.0006112873,0.59186995,0.0010690262,0.0003566006,0.0016520674,0.007746464,0.30940175,0.013710151,0.016636295,0.0521209,0.0024704235],"about_ca_topic_score_codex":0.00059244304,"about_ca_topic_score_gemma":0.0013787256,"teacher_disagreement_score":0.61998636,"about_ca_system_score_codex":0.00006545164,"about_ca_system_score_gemma":0.000017149556,"threshold_uncertainty_score":0.2769338},"labels":[],"label_agreement":null},{"id":"W7100220259","doi":"","title":"IESO Stakeholder Advisory Committee Minutes of Meeting","year":2012,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Stakeholder; Advisory committee; Plan (archaeology); Legislature; Representation (politics); Stakeholder engagement","score_opus":0.023560976389004108,"score_gpt":0.20233442838233587,"score_spread":0.17877345199333175,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100220259","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2976878,0.009159855,0.16291283,0.00006242707,0.0011812801,0.00038943943,0.0000061357423,0.0010620371,0.5275382],"genre_scores_gemma":[0.9929876,0.000017727367,0.006095672,0.000013655065,0.000056504665,0.0000056684826,0.0000032329988,0.000022218566,0.00079776853],"study_design_codex":"not_applicable","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994327,0.000018433873,0.00019230574,0.000046909012,0.00010219312,0.0002074492],"domain_scores_gemma":[0.9996948,0.00006481751,0.000027842447,0.00014267748,0.000028240805,0.00004159407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017618286,0.00007803392,0.00011623912,0.00006572058,0.000015474618,0.000005971391,0.00007172992,0.000044581382,0.00009795435],"category_scores_gemma":[0.000024831766,0.00007472351,0.000023465282,0.00015863686,0.000008514277,0.00016252152,0.000011672478,0.000050151855,0.000025599213],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019057608,0.0003730921,0.2929931,0.0018461595,0.0006296101,0.0000032643188,0.010693941,0.21767162,0.10677041,0.010384701,0.33294564,0.025669394],"study_design_scores_gemma":[0.002066376,0.00015027098,0.032652177,0.0004236875,0.0001660205,0.00004684787,0.0021361948,0.31024098,0.5884739,0.00014251086,0.061651267,0.0018497456],"about_ca_topic_score_codex":0.000015521648,"about_ca_topic_score_gemma":0.0000049756227,"teacher_disagreement_score":0.69529974,"about_ca_system_score_codex":0.00002709623,"about_ca_system_score_gemma":0.0000041843405,"threshold_uncertainty_score":0.30471364},"labels":[],"label_agreement":null},{"id":"W7100420514","doi":"","title":"Date Raised","year":2002,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volatility (finance); Schedule; Market clearing; Market price; Energy market; Market rate","score_opus":0.008525540827772233,"score_gpt":0.1450914455667136,"score_spread":0.13656590473894137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100420514","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001890217,0.0002565865,0.2004043,0.000038453618,0.00019945,0.000055707773,3.6309078e-7,0.0007188538,0.7964361],"genre_scores_gemma":[0.9933088,0.00003344067,0.0017729859,0.00002661718,0.000022482413,0.0000035990126,0.000001280637,0.000011365537,0.0048194276],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997771,0.0000034398706,0.00005900153,0.00003895269,0.00004020338,0.00008132355],"domain_scores_gemma":[0.999878,0.0000065433246,0.0000034266136,0.00008632355,0.0000059844388,0.000019706453],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000019236626,0.000035625733,0.000036869726,0.000028173607,0.000008676516,0.000009596176,0.000039077928,0.000018500365,0.0013972191],"category_scores_gemma":[0.000004124577,0.00003386762,0.000008730818,0.00010992496,0.0000016566541,0.00005708377,0.000002625085,0.00002269087,0.0006045196],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000012849292,0.00003438534,0.00058199494,0.00007364998,0.00007503369,0.000013175703,0.00049693196,0.2560799,0.008140345,0.0048479256,0.70120627,0.028449075],"study_design_scores_gemma":[0.000113555965,0.000004304712,0.00005075877,0.0000022610466,0.0000013386075,0.0000033232348,0.0000017254711,0.96495396,0.0029542467,0.000005945074,0.031843178,0.00006541612],"about_ca_topic_score_codex":8.062706e-7,"about_ca_topic_score_gemma":5.7480673e-7,"teacher_disagreement_score":0.9914186,"about_ca_system_score_codex":0.00000863845,"about_ca_system_score_gemma":4.1052863e-7,"threshold_uncertainty_score":0.99951565},"labels":[],"label_agreement":null},{"id":"W7100705014","doi":"","title":"Abstract Energy Policy] (]]]])]]]–]]]","year":2006,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volatility (finance); Electricity; Electricity market; Electricity price; Volatility swap; Volatility smile","score_opus":0.002173511391341893,"score_gpt":0.16429896050292805,"score_spread":0.16212544911158616,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100705014","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030843127,0.00024714466,0.19238843,0.00006169893,0.00016229942,0.00003111883,0.0000011728591,0.0008682698,0.80315554],"genre_scores_gemma":[0.995847,0.00001467177,0.000824527,0.000035673642,0.000223379,0.0000058508904,0.000010158537,0.000022805483,0.0030159755],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995508,0.0000031446812,0.00013188792,0.00006786625,0.000079026395,0.00016725714],"domain_scores_gemma":[0.9998241,0.000012734202,0.000010139273,0.00011350621,0.0000141275705,0.000025370759],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00002821022,0.000074889016,0.00006543634,0.000110824345,0.000016360798,0.000021291939,0.000061317696,0.000046335186,0.00010623269],"category_scores_gemma":[0.0000032676994,0.00007355428,0.000022549539,0.00024200996,0.000004242354,0.00007784127,0.000004278672,0.000029529994,0.00007187433],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000022427494,0.000037595397,0.00049602624,0.00004485246,0.00003261932,0.000011900593,0.000021739575,0.6137923,0.018277524,0.19263875,0.16226405,0.012380408],"study_design_scores_gemma":[0.001008627,0.0000408924,0.02384234,0.000038788094,0.000016856977,0.00006251764,0.000015346506,0.49638945,0.13182265,0.006811574,0.33869594,0.0012550252],"about_ca_topic_score_codex":0.0008453046,"about_ca_topic_score_gemma":0.000105200015,"teacher_disagreement_score":0.9927626,"about_ca_system_score_codex":0.00007047529,"about_ca_system_score_gemma":0.000011921448,"threshold_uncertainty_score":0.29994562},"labels":[],"label_agreement":null},{"id":"W7100917335","doi":"","title":"FOURTH AMENDING AGREEMENT TO THE BRUCE POWER REFURBISHMENT IMPLEMENTATION AGREEMENT Between","year":2016,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Agreement; General partnership; Power (physics); Corporation; Receipt; Power of attorney","score_opus":0.012567173309488606,"score_gpt":0.254492918952684,"score_spread":0.24192574564319538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100917335","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.110868745,0.00009483003,0.8612742,0.004957748,0.00092593255,0.0016579893,0.000029809067,0.00040558598,0.019785149],"genre_scores_gemma":[0.9954979,0.000025971955,0.0026467384,0.00018657255,0.00013445225,0.0001259391,0.000011738292,0.00002964837,0.0013410774],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984475,0.00004718659,0.0004207817,0.00023751834,0.0004181574,0.00042886662],"domain_scores_gemma":[0.99933296,0.00006565129,0.000056957902,0.00037796018,0.000051407384,0.00011504371],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00045637315,0.00018940911,0.00015173938,0.00012825557,0.00009470905,0.000059044865,0.00024108838,0.000038075108,0.0010684067],"category_scores_gemma":[0.000011777864,0.00011225143,0.00004883501,0.00028966385,0.000006759691,0.0001707697,0.000065485314,0.00005202298,0.0005866788],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031292486,0.00008468108,0.03550949,0.00010110051,0.00116572,0.000010371206,0.0048923884,0.022150999,0.033759378,0.0052210935,0.33908013,0.55799335],"study_design_scores_gemma":[0.0066433996,0.001721658,0.10200446,0.0005077925,0.0003467671,0.000021236303,0.0030868398,0.004527683,0.34139767,0.0005049422,0.53606725,0.0031702896],"about_ca_topic_score_codex":0.00003870024,"about_ca_topic_score_gemma":0.00011037714,"teacher_disagreement_score":0.88462913,"about_ca_system_score_codex":0.0006184319,"about_ca_system_score_gemma":0.000015663554,"threshold_uncertainty_score":0.99984473},"labels":[],"label_agreement":null},{"id":"W7101100400","doi":"","title":"Reference","year":2005,"lang":"en","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Process (computing); Power (physics); Capital expenditure; Capital (architecture); Capital equipment","score_opus":0.006633364742468803,"score_gpt":0.18339118454602882,"score_spread":0.17675781980356,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7101100400","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004995804,0.00015182284,0.21655913,0.000048952632,0.00006116872,0.00003216877,1.9557899e-7,0.0006067372,0.777544],"genre_scores_gemma":[0.99083817,0.000014600322,0.0069755465,0.000025120595,0.000030051004,0.00000236761,0.0000010572566,0.000005499473,0.0021075795],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998357,0.0000017884374,0.00004530014,0.000028127517,0.000030508709,0.000058529076],"domain_scores_gemma":[0.9999158,0.0000041119188,0.0000022220415,0.000057622983,0.0000064209466,0.000013867386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000018382589,0.000024794701,0.000023907605,0.00001823933,0.0000054518587,0.0000057222555,0.000030756444,0.00001623094,0.00020628495],"category_scores_gemma":[0.0000020803723,0.000023035192,0.000003986536,0.000060265676,0.0000010558372,0.00005607612,0.000001940568,0.000021884669,0.0004116126],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014284699,0.000015990272,0.00045957798,0.000030309975,0.000025597914,0.0000013385143,0.00019462634,0.71589077,0.007246971,0.024409913,0.12001296,0.1317105],"study_design_scores_gemma":[0.00010423822,0.0000073210113,0.0003519972,0.0000043536106,0.0000020050757,0.0000057835,0.0000043266787,0.7976088,0.013480479,0.000029110532,0.18828195,0.000119660945],"about_ca_topic_score_codex":0.0000012872824,"about_ca_topic_score_gemma":0.0000072589464,"teacher_disagreement_score":0.98584235,"about_ca_system_score_codex":0.000022413951,"about_ca_system_score_gemma":0.0000017390787,"threshold_uncertainty_score":0.5290584},"labels":[],"label_agreement":null},{"id":"W7116694939","doi":"10.18280/mmep.121127","title":"Push Spread Algorithm: A New Metaheuristic Algorithm to Solve Cases in Economic Load Dispatch Problem","year":2025,"lang":"","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Metaheuristic; Key (lock); Particle swarm optimization; Optimization algorithm; Algorithm design","score_opus":0.012557532964136805,"score_gpt":0.21620796632922773,"score_spread":0.20365043336509092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7116694939","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0011817747,0.005777461,0.98913586,0.0002516483,0.0006464504,0.0017429785,0.000031907126,0.0004624401,0.00076944893],"genre_scores_gemma":[0.08595902,0.0010287465,0.91053057,0.00002949842,0.00020602327,0.00041955456,0.000017034456,0.00025071294,0.0015588317],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9955882,0.00003578145,0.0017135001,0.0010006252,0.00036434297,0.001297542],"domain_scores_gemma":[0.99805534,0.0005819469,0.00011382203,0.00061204616,0.00008198338,0.00055486686],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009005448,0.000924023,0.0013572638,0.0007552451,0.00010341685,0.00042302095,0.0003980474,0.00043910556,0.000035445093],"category_scores_gemma":[0.00013231613,0.0010292593,0.00016953409,0.00092383183,0.00003227714,0.00031577016,0.00018496263,0.00071661413,0.00013640086],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007863269,0.00009946784,0.0000056080394,0.0026459792,0.00021972905,0.000026047894,0.0014780707,0.9704801,0.00004965479,0.004449472,0.00025398098,0.020284029],"study_design_scores_gemma":[0.00080563745,0.00012373373,0.0000030887325,0.0044563147,0.0002133307,0.00006636796,0.000030775835,0.9818856,0.00016014461,0.010538091,0.00081257505,0.00090433296],"about_ca_topic_score_codex":0.0006140349,"about_ca_topic_score_gemma":0.000027878943,"teacher_disagreement_score":0.08477724,"about_ca_system_score_codex":0.0009874634,"about_ca_system_score_gemma":0.00028082918,"threshold_uncertainty_score":0.9992158},"labels":[],"label_agreement":null},{"id":"W7124160165","doi":"10.1109/codit66093.2025.11321880","title":"Optimizing Profile Block Bids in Short-Term Hydropower Scheduling: A Two-Phase Model for the Day-Ahead Market","year":2025,"lang":"","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Group for Research in Decision Analysis; Université du Québec à Chicoutimi","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bidding; Block (permutation group theory); Electricity market; Hydropower; Production (economics); Scheduling (production processes); Set (abstract data type); Range (aeronautics); Electricity","score_opus":0.017013503876092656,"score_gpt":0.2929655988750061,"score_spread":0.2759520949989135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7124160165","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005021796,0.0042409743,0.95136666,0.0005147924,0.0014178781,0.0043261684,0.000046924975,0.0003533769,0.032711398],"genre_scores_gemma":[0.92863935,0.00032735316,0.058351304,0.00012720107,0.00013788103,0.0009150971,0.000032485765,0.00016135824,0.011307945],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9956087,0.00018586208,0.0015359924,0.00095087074,0.00040227344,0.0013163345],"domain_scores_gemma":[0.99744797,0.0008811313,0.000095477844,0.001177748,0.00022925097,0.00016842688],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0022052852,0.0007648569,0.00080361747,0.0007940896,0.0003217375,0.0003576295,0.0008310147,0.0004269922,0.00027235833],"category_scores_gemma":[0.0003306205,0.0006801618,0.00031130694,0.0018980642,0.000077544995,0.00046759433,0.00021482297,0.0006986351,0.000014988598],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019298965,0.00033500983,0.00014893328,0.00048091062,0.00032470134,0.000009030026,0.0010255156,0.986338,0.0018966763,0.0012110253,0.0030308033,0.005006391],"study_design_scores_gemma":[0.0038553474,0.00010069096,0.00001083553,0.00062769995,0.0002484698,0.000008169571,0.00017475378,0.99051106,0.0033533715,0.00007947227,0.00034992327,0.00068019633],"about_ca_topic_score_codex":0.00004215974,"about_ca_topic_score_gemma":0.00012231273,"teacher_disagreement_score":0.9236176,"about_ca_system_score_codex":0.0007173264,"about_ca_system_score_gemma":0.0004656787,"threshold_uncertainty_score":0.99956495},"labels":[],"label_agreement":null},{"id":"W7125228072","doi":"10.18280/mmep.121201","title":"Application of Kron’s Reduction Method to Evaluate Generating Unit Power Variability in the Kron Loss Model Under Economic Dispatch","year":2025,"lang":"","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Direcció General de Recerca, Generalitat de Catalunya","keywords":"Economic dispatch; Reduction (mathematics); Power (physics); Control theory (sociology); Electric power system; Unit (ring theory)","score_opus":0.018340621428359835,"score_gpt":0.2620081968630243,"score_spread":0.24366757543466444,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7125228072","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.045886934,0.00042777206,0.95148903,0.00027626887,0.0001631129,0.0013442795,0.0000074340505,0.00010429248,0.0003008491],"genre_scores_gemma":[0.77755195,0.00007003646,0.2219614,0.000009878341,0.00003061937,0.00027700554,0.0000065787603,0.000051628725,0.000040917508],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99712664,0.00022297593,0.0012918258,0.0005907173,0.00026138008,0.0005064415],"domain_scores_gemma":[0.9985534,0.00053242344,0.00009610959,0.00063257146,0.00008862482,0.00009684688],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0046745045,0.00042683678,0.0006465413,0.00033088523,0.000094579045,0.00007054781,0.0003028433,0.00028506946,0.000006299066],"category_scores_gemma":[0.00009756983,0.00039725675,0.000089867324,0.0006114345,0.000027358024,0.00018205843,0.00007579607,0.00045117654,0.0000065760933],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009249716,0.00008690475,0.000012228095,0.0017976724,0.00006654405,1.3550098e-7,0.0022789126,0.95630044,0.0025689506,0.03606144,0.00000629079,0.0008112551],"study_design_scores_gemma":[0.00028907956,0.000035858517,0.000011317061,0.0006493343,0.000111828,0.000008729286,0.00008438607,0.9761936,0.00057761936,0.021703847,0.000010465275,0.00032389993],"about_ca_topic_score_codex":0.00012585153,"about_ca_topic_score_gemma":0.0000043145355,"teacher_disagreement_score":0.731665,"about_ca_system_score_codex":0.0003753408,"about_ca_system_score_gemma":0.00007481309,"threshold_uncertainty_score":0.99984795},"labels":[],"label_agreement":null},{"id":"W7126263680","doi":"10.5281/zenodo.18440600","title":"GDP Impacts of Trans Mountain Oil Pipeline Crown Corporation in Canada","year":2025,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Revenue; Corporation; Capital expenditure; Government (linguistics); Economic impact analysis; Production (economics); Pipeline (software); Government revenue; Government spending","score_opus":0.010096952141807418,"score_gpt":0.19821629247183473,"score_spread":0.1881193403300273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7126263680","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28581977,0.0011601963,0.2812082,0.0010219149,0.00084189355,0.0011615634,0.0006918673,0.0017741605,0.42632043],"genre_scores_gemma":[0.9984249,0.00010807722,0.00012552639,0.000031669715,0.000018044622,4.3517254e-8,0.00047568514,0.00036450557,0.00045157314],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99889654,0.00012579437,0.0003505535,0.00016690529,0.00021902756,0.00024115501],"domain_scores_gemma":[0.99937385,0.0000206577,0.00005732717,0.0002336842,0.00025038308,0.0000640795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033857388,0.0001068938,0.0001528453,0.00029104334,0.00019441276,0.000102322745,0.00035666657,0.000045649038,0.0008258873],"category_scores_gemma":[0.00019374427,0.00012538962,0.000019517816,0.0010045291,0.000023829589,0.00017513272,0.00007296849,0.00015725233,0.00007466209],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022073489,0.00019334357,0.00032785986,0.0015211831,0.00014299383,0.00003981772,0.002196747,0.25260666,0.05394124,0.006351805,0.4472129,0.2352447],"study_design_scores_gemma":[0.002128447,0.000120773824,0.0034076297,0.00034544957,0.000033199758,0.000040376948,0.00051876134,0.281556,0.015674168,0.00011299037,0.6955764,0.00048576272],"about_ca_topic_score_codex":0.04632381,"about_ca_topic_score_gemma":0.01467373,"teacher_disagreement_score":0.7126051,"about_ca_system_score_codex":0.0008363044,"about_ca_system_score_gemma":0.000039414444,"threshold_uncertainty_score":0.9600268},"labels":[],"label_agreement":null},{"id":"W7126285806","doi":"","title":"Las cuentas trimestrales del sector eléctrico español: su elaboración en el periodo 1987-1996","year":2001,"lang":"es","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Electricity; Public sector; Period (music); Financial sector; Secondary sector of the economy","score_opus":0.008382337684560587,"score_gpt":0.24685326624445825,"score_spread":0.23847092855989765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7126285806","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80234444,0.015382518,0.09394348,0.0011943437,0.0034903428,0.0020534676,0.00015477228,0.0030632906,0.078373335],"genre_scores_gemma":[0.983547,0.003071883,0.0043357424,0.00011575275,0.0007834538,0.000058423026,0.00011133792,0.00025735068,0.0077190753],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9961911,0.00026036863,0.0010179846,0.0007520229,0.0006082801,0.0011702729],"domain_scores_gemma":[0.9981059,0.00031151023,0.00020135703,0.0007995891,0.00020349419,0.00037814185],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00047318355,0.00077854394,0.00078224676,0.0006677349,0.00018948698,0.00048085576,0.0005817876,0.0005894385,0.0009732183],"category_scores_gemma":[0.00019858082,0.00081593316,0.0002571005,0.0021528206,0.000050499653,0.0006851382,0.00008364175,0.00057108706,0.001062107],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00073943165,0.002239011,0.459904,0.003092844,0.0036397239,0.0013478792,0.005841703,0.3029603,0.040972006,0.05671061,0.08277237,0.03978015],"study_design_scores_gemma":[0.0073689665,0.0013041559,0.09781605,0.0010459857,0.0011258585,0.0011007912,0.0008698931,0.46772024,0.029867353,0.00024108772,0.38555148,0.005988139],"about_ca_topic_score_codex":0.000870489,"about_ca_topic_score_gemma":0.00006640836,"teacher_disagreement_score":0.36208794,"about_ca_system_score_codex":0.00067336345,"about_ca_system_score_gemma":0.00029339443,"threshold_uncertainty_score":0.99994004},"labels":[],"label_agreement":null},{"id":"W7126874432","doi":"","title":"Análisis comparativo de las tarifas eléctricas en la Unión Europea","year":2000,"lang":"es","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"European union; Quarter (Canadian coin); Western europe","score_opus":0.0041967692350946524,"score_gpt":0.21616325815040374,"score_spread":0.2119664889153091,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7126874432","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.069300175,0.0018028818,0.05021615,0.0002874121,0.00019575318,0.00036961783,0.000014872025,0.00078855606,0.8770246],"genre_scores_gemma":[0.9709007,0.0010895377,0.005642811,0.000103995044,0.00020015787,0.000012582775,0.000021574837,0.00010544395,0.021923184],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978512,0.00050369627,0.00047896456,0.0003396437,0.0002577861,0.00056874094],"domain_scores_gemma":[0.9989129,0.00034377244,0.000056801146,0.00044202677,0.000056989677,0.0001875643],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00043128748,0.00035211485,0.00039408656,0.0002179673,0.00008963852,0.00025326817,0.0003478942,0.00024117874,0.0032560339],"category_scores_gemma":[0.000051673487,0.00036412483,0.000098214645,0.0010316881,0.000031280968,0.00025537363,0.00002867669,0.00037299687,0.0021928956],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007195407,0.00030331142,0.0064316317,0.00030778802,0.0005077326,0.00021056684,0.0026062462,0.84203744,0.0019208251,0.023200342,0.0897455,0.032656673],"study_design_scores_gemma":[0.0008414162,0.00013165553,0.0077196257,0.00013128317,0.0001181206,0.00013466315,0.00004451857,0.53205055,0.0031559712,0.00003706602,0.4549222,0.0007129357],"about_ca_topic_score_codex":0.00026884975,"about_ca_topic_score_gemma":0.000011264674,"teacher_disagreement_score":0.90160054,"about_ca_system_score_codex":0.00026923185,"about_ca_system_score_gemma":0.000085036976,"threshold_uncertainty_score":0.9998811},"labels":[],"label_agreement":null},{"id":"W7130700782","doi":"10.1109/giest66547.2025.11387152","title":"Optimizing Short-Term Hydrothermal Dispatch: A Robust Solution via Artificial Protozoa Optimizer","year":2025,"lang":"","type":"article","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Horizon College and Seminary","funders":"","keywords":"Scheduling (production processes); Computation; Optimization problem; Cuckoo search; Evolutionary algorithm; Optimization algorithm; Sine; Hydrothermal circulation","score_opus":0.01622701125226706,"score_gpt":0.23383509236560332,"score_spread":0.21760808111333627,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7130700782","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002925654,0.001473081,0.94512355,0.0004122839,0.0028905054,0.005143029,0.000013275161,0.0010791502,0.04093947],"genre_scores_gemma":[0.9227634,0.00016667483,0.070812196,0.00010363385,0.0005158286,0.0011603056,0.000066002816,0.00023884025,0.0041730898],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9942771,0.00027450765,0.0019136368,0.0012057194,0.0006491717,0.0016798449],"domain_scores_gemma":[0.9980299,0.00013233042,0.00019252872,0.001088481,0.0002604118,0.00029638206],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0008205024,0.0010401537,0.0010251098,0.00087843445,0.00054135924,0.0005508836,0.0006757957,0.0008408158,0.0009832359],"category_scores_gemma":[0.00007610893,0.0011671633,0.00041909004,0.001971545,0.00012233807,0.00096255145,0.0002484247,0.0008538401,0.00018716652],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017210125,0.00029239053,0.00039358073,0.0006224678,0.00047099384,0.000026735976,0.0005672185,0.9622704,0.014745639,0.0013895736,0.0009324963,0.018116415],"study_design_scores_gemma":[0.0007742802,0.00012234437,0.0001539978,0.0006906718,0.0003051639,0.000024071453,0.0000616758,0.9728003,0.023683945,0.00007317884,0.00024575004,0.0010646319],"about_ca_topic_score_codex":0.00015210218,"about_ca_topic_score_gemma":0.00013264104,"teacher_disagreement_score":0.9198378,"about_ca_system_score_codex":0.0011683241,"about_ca_system_score_gemma":0.00029287135,"threshold_uncertainty_score":0.99993},"labels":[],"label_agreement":null},{"id":"W7130956803","doi":"10.3808/jeil.202400164","title":"Development of An Interval Chance-Constrained Mixed-Integer Linear Programming Model for Electric Power System Planning — A Case Study for the Province of Alberta, Canada","year":2025,"lang":"","type":"article","venue":"Journal of Environmental Informatics Letters","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Linear programming; Electric power system; Electricity generation; Electricity; Modular design; Interval (graph theory); Profit (economics); Key (lock); Mains electricity","score_opus":0.007688159295276665,"score_gpt":0.21625306692491064,"score_spread":0.20856490762963398,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7130956803","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48576474,0.00012527523,0.5119704,0.000028717635,0.00034241378,0.001736476,0.000018989818,0.000004486099,0.000008516761],"genre_scores_gemma":[0.9507964,0.0000033317035,0.048944905,0.00007131984,0.000031909367,0.00008747357,0.000006295885,0.000036988782,0.000021363778],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9957597,0.0000487572,0.003087772,0.00012823797,0.0005065144,0.00046898043],"domain_scores_gemma":[0.9972341,0.0003990074,0.0019079418,0.00027523612,0.00007701482,0.00010669875],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011109196,0.0003796169,0.0007389707,0.0003467828,0.00019725232,0.000048459202,0.00044240837,0.00009842924,0.0000014803937],"category_scores_gemma":[0.00005975396,0.0003170033,0.00019649527,0.00022778694,0.000048883863,0.0004954446,0.000063757216,0.00032809135,9.241355e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026661344,0.0002934659,0.00016977191,0.0020726959,0.0014217054,0.000052978485,0.023758598,0.9645425,0.0019247355,0.000010437271,0.000149004,0.0053374753],"study_design_scores_gemma":[0.0018772184,0.0005437922,0.000036143654,0.0007847518,0.00038922776,0.0004617132,0.037788916,0.9544232,0.0033004044,2.0884907e-7,0.00014680832,0.0002476314],"about_ca_topic_score_codex":0.0010272479,"about_ca_topic_score_gemma":0.0034563134,"teacher_disagreement_score":0.46503165,"about_ca_system_score_codex":0.0015996387,"about_ca_system_score_gemma":0.00077549386,"threshold_uncertainty_score":0.9999282},"labels":[],"label_agreement":null},{"id":"W7132884331","doi":"","title":"ELFORSPOT: an equilibrium model of the combined forward market and spot market for electricity, using complementarity programming","year":2004,"lang":"","type":"dissertation","venue":"TSpace","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Spot market; Complementarity (molecular biology); Forward contract; Spot contract; Electricity market; Electricity; Forward market; Forward price","score_opus":0.024940976131321794,"score_gpt":0.3011090744012371,"score_spread":0.2761680982699153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7132884331","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7539077,0.0008944886,0.23376483,0.00014369198,0.0009130978,0.00787976,0.00015580996,0.00018228804,0.0021583468],"genre_scores_gemma":[0.95503294,0.000085066175,0.041538518,0.000017012377,0.00009118959,0.00018246067,0.00042363472,0.00027110224,0.0023580636],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9958924,0.00021514989,0.0012497347,0.00083120406,0.0006828032,0.0011287129],"domain_scores_gemma":[0.99729794,0.0002586172,0.000977142,0.0008074682,0.00043571458,0.00022310871],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011740244,0.00090182974,0.0011562331,0.00041241813,0.0003838728,0.00020623628,0.00068551744,0.00057833025,0.0000848654],"category_scores_gemma":[0.00018109988,0.0009223446,0.0003342075,0.0010336174,0.00008386136,0.00044622298,0.00013306589,0.0005613396,3.4702103e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0032566814,0.00086529914,0.0036604754,0.016378438,0.0013624303,0.000002730399,0.0160121,0.90094024,0.050370567,0.0027750179,0.0008242079,0.0035517928],"study_design_scores_gemma":[0.0024819078,0.0004514611,0.00047297438,0.00079221214,0.0007439228,0.000011962935,0.00085288327,0.98284143,0.00956786,0.0008980574,0.000045310066,0.0008399937],"about_ca_topic_score_codex":0.00095860526,"about_ca_topic_score_gemma":0.0006530287,"teacher_disagreement_score":0.20112526,"about_ca_system_score_codex":0.0009486038,"about_ca_system_score_gemma":0.00060996483,"threshold_uncertainty_score":0.9993227},"labels":[],"label_agreement":null},{"id":"W7132939890","doi":"","title":"ELEMCOMP: an equilibrium model of combined electric generation and emissions competition using complementarity programming","year":2003,"lang":"","type":"dissertation","venue":"TSpace","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Profitability index; Oligopoly; Electricity; Imperfect competition; Electricity generation; Electricity market; Complementarity (molecular biology); Competition (biology); Perfect competition","score_opus":0.0445677092930877,"score_gpt":0.3186151487338364,"score_spread":0.2740474394407487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7132939890","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7364551,0.0010583618,0.25949264,0.000029206003,0.00047203392,0.0016593545,0.000021437132,0.00013716356,0.00067472714],"genre_scores_gemma":[0.9447923,0.00021480757,0.05091812,0.000011747918,0.000104760205,0.00006169889,0.0031786906,0.00018868122,0.00052921433],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9960705,0.00036541605,0.001348722,0.00081211573,0.00062039675,0.0007828603],"domain_scores_gemma":[0.99768305,0.00007866065,0.00084352173,0.0005733115,0.0005077787,0.0003136666],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000563634,0.0007865795,0.0010065271,0.0006827749,0.00037139398,0.00019773436,0.00025125028,0.0005608449,0.00012326721],"category_scores_gemma":[0.0000716143,0.0010092739,0.00013890128,0.0011284552,0.00004200171,0.0005748682,0.000038218615,0.0005809608,0.0000021363544],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006364438,0.0002562619,0.00040574258,0.0010146752,0.00014225922,0.0000010813413,0.0028463092,0.40002626,0.59224856,0.0023675284,0.000040759056,0.00058692106],"study_design_scores_gemma":[0.0011465555,0.00039475004,0.00007156502,0.00036878829,0.0004180657,0.000014274669,0.0007183337,0.95103633,0.044896483,0.00011810918,0.000019335765,0.000797431],"about_ca_topic_score_codex":0.0005440567,"about_ca_topic_score_gemma":0.00020202334,"teacher_disagreement_score":0.5510101,"about_ca_system_score_codex":0.00059118407,"about_ca_system_score_gemma":0.00037185292,"threshold_uncertainty_score":0.99923575},"labels":[],"label_agreement":null},{"id":"W7162035656","doi":"10.82308/35590","title":"Wind power integration in electrical networks with transmission congestion: operational complications and efficient solutions","year":2013,"lang":"en","type":"dissertation","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Power system simulation; Electric power system; Grid; Scheduling (production processes); Electric power transmission; Unit (ring theory); Resource (disambiguation); Electric power","score_opus":0.005812687722216487,"score_gpt":0.2045501951492464,"score_spread":0.19873750742702992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7162035656","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04934883,0.0033164076,0.91718554,0.00021621691,0.000390663,0.0019835755,0.000008721732,0.00047117565,0.027078884],"genre_scores_gemma":[0.9933166,0.0002320533,0.003463661,0.00003231574,0.000033693574,0.00023052696,0.0018437692,0.000068667025,0.0007787314],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985318,0.00005624804,0.0004752718,0.0003551077,0.00025938408,0.0003221634],"domain_scores_gemma":[0.99933696,0.00008335372,0.00006779581,0.00018394344,0.00021735279,0.0001105902],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012974704,0.00032504424,0.00028307087,0.00038200078,0.00015147911,0.00012710349,0.000105639025,0.00038608987,0.00010926889],"category_scores_gemma":[0.0000136334575,0.0002850288,0.000034345725,0.00063867815,0.000023196686,0.0001655408,0.0000046110895,0.00048060267,0.000016294429],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002571685,0.00008269652,0.00008391775,0.00003472654,0.00003734836,0.0000013795175,0.00043043288,0.98168427,0.00073244335,0.008823212,0.0012047286,0.0068591083],"study_design_scores_gemma":[0.0004359478,0.00007760703,0.021200517,0.00026803956,0.000031918855,0.000021382792,0.000089520494,0.97704065,0.00013231148,0.00001835912,0.00032165155,0.00036209586],"about_ca_topic_score_codex":0.000049999206,"about_ca_topic_score_gemma":0.00017360762,"teacher_disagreement_score":0.94396776,"about_ca_system_score_codex":0.00031469745,"about_ca_system_score_gemma":0.00008839836,"threshold_uncertainty_score":0.9999602},"labels":[],"label_agreement":null},{"id":"W7164915702","doi":"10.1080/17153379.2004.12554037","title":"State Power and the Logic of Reform in China's Electricity Sector","year":2004,"lang":"en","type":"article","venue":"Pacific Affairs","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Electricity; State (computer science); Power (physics); Electricity retailing; Mains electricity; Electric power industry","score_opus":0.0035933247028014288,"score_gpt":0.1754792128269343,"score_spread":0.17188588812413286,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7164915702","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21094827,0.003410742,0.06439335,0.00022940626,0.00043000895,0.0010045092,0.000013832537,0.00036854236,0.7192013],"genre_scores_gemma":[0.99942064,0.00019849623,0.00028507138,0.0000015529419,0.0000074938,0.000013442575,0.0000020211019,0.000017405566,0.00005387915],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99930376,0.000029823152,0.000229552,0.000113613474,0.000117198506,0.00020606986],"domain_scores_gemma":[0.9997141,0.000027945545,0.00004550412,0.00016605048,0.000017721986,0.000028728291],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028076407,0.00010966255,0.00018929876,0.00011008904,0.000022542974,0.000012880699,0.00008716958,0.00004866786,0.000010391293],"category_scores_gemma":[0.00002515213,0.000075943775,0.000029233357,0.0004588087,0.000046608035,0.0000800101,0.000012139778,0.0001335855,0.000005304368],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00075689564,0.00035154825,0.0040954524,0.0008408535,0.0004172762,0.00007121044,0.07006314,0.81385946,0.009759696,0.09384195,0.00047138106,0.005471125],"study_design_scores_gemma":[0.059738763,0.0023400306,0.07942535,0.0012721493,0.00024757875,0.00061768555,0.088823274,0.51917857,0.117727354,0.123853765,0.0010895052,0.00568595],"about_ca_topic_score_codex":0.0001130089,"about_ca_topic_score_gemma":0.00004640717,"teacher_disagreement_score":0.78847235,"about_ca_system_score_codex":0.00024012012,"about_ca_system_score_gemma":0.00001777941,"threshold_uncertainty_score":0.30968973},"labels":[],"label_agreement":null},{"id":"W754628560","doi":"","title":"Large-scale Solar PV Investment Planning Studies","year":2011,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Scale (ratio); Photovoltaic system; Investment (military); Environmental science; Business; Geography; Engineering; Political science; Cartography; Electrical engineering","score_opus":0.013484665237233774,"score_gpt":0.20285283068284385,"score_spread":0.18936816544561008,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W754628560","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9852939,0.0046767797,0.001078357,0.000026830285,0.0012656186,0.00043782897,0.000034511082,0.00044259924,0.006743561],"genre_scores_gemma":[0.15232845,0.0023100206,0.010262024,0.000033789005,0.00014363133,0.000004930455,0.0014848453,0.00023272127,0.8331996],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9990495,0.000035545945,0.00014930572,0.00024813542,0.00020772546,0.0003097788],"domain_scores_gemma":[0.99936426,0.00001719182,0.00014242846,0.00026018664,0.00014218176,0.000073742456],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012193646,0.00026408484,0.00045543423,0.00031945377,0.00012959838,0.00001023801,0.0002573582,0.00027207917,0.00006017371],"category_scores_gemma":[0.0000072659764,0.00032500803,0.00010757358,0.00020597335,0.0000245271,0.00020616254,0.000035387926,0.00022018542,0.000056444867],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000088491324,0.0000772599,0.0006158092,0.002246299,0.0012024913,0.000079920115,0.9639468,0.012087725,0.0016258392,0.0001736635,0.017425336,0.00043031815],"study_design_scores_gemma":[0.002151192,0.0003261095,0.0029845696,0.00223403,0.00096678326,0.000009146121,0.94666713,0.023599524,0.013505067,0.00034804567,0.005480672,0.0017277421],"about_ca_topic_score_codex":0.0009479621,"about_ca_topic_score_gemma":0.006657681,"teacher_disagreement_score":0.8329655,"about_ca_system_score_codex":0.00014805718,"about_ca_system_score_gemma":0.00003067989,"threshold_uncertainty_score":0.9999202},"labels":[],"label_agreement":null},{"id":"W77701045","doi":"10.1007/0-387-25477-3_8","title":"Generalized Uplifts in Pool-Based Electricity Markets","year":2005,"lang":"en","type":"book-chapter","venue":"","topic":"Electric Power System Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"","keywords":"Electricity; Business; Economics; Commerce; Physics","score_opus":0.00721964928960189,"score_gpt":0.19000332638757905,"score_spread":0.18278367709797716,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W77701045","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000119911885,0.0020420023,0.04790956,0.00005309035,0.00030693875,0.0005696213,0.000009714719,0.00078801916,0.9482011],"genre_scores_gemma":[0.0790439,0.0009680826,0.008160169,0.00045495157,0.00045617236,0.00007739984,0.00027192882,0.00049707165,0.9100703],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983723,0.00002149641,0.00055927277,0.0003433783,0.00029262694,0.0004109086],"domain_scores_gemma":[0.9993204,0.00006596821,0.00008198468,0.00038888573,0.00005237493,0.000090406415],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00020979547,0.00045691826,0.0005176031,0.0006375142,0.000020975827,0.00003487878,0.00021878553,0.00056211645,0.0014901634],"category_scores_gemma":[0.000015277166,0.00049724616,0.0001243204,0.00014603356,0.000009979574,0.00007761558,0.000014771405,0.00042429665,0.00022227174],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016257777,0.00009024247,0.00013070094,0.00067127997,0.00045929305,0.00019332382,0.0000602425,0.75529593,0.00073901954,0.059975717,0.13719879,0.045022886],"study_design_scores_gemma":[0.0014120749,0.000037957805,0.00010499218,0.00020684497,0.0000539087,0.000013135103,2.576974e-7,0.8114988,0.0013184056,0.00048112057,0.18366921,0.0012032907],"about_ca_topic_score_codex":0.00002282157,"about_ca_topic_score_gemma":0.00014332254,"teacher_disagreement_score":0.07892399,"about_ca_system_score_codex":0.0006230156,"about_ca_system_score_gemma":0.00008260159,"threshold_uncertainty_score":0.99974793},"labels":[],"label_agreement":null},{"id":"W975443591","doi":"10.11575/prism/24831","title":"An Analysis of Market Power in the Alberta Electricity Market","year":2013,"lang":"en","type":"dissertation","venue":"PRISM (University of Calgary)","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity market; Market power; Market analysis; Electricity; Power market; Business; Power (physics); Economics; Engineering; Electrical engineering; Market economy; Electric power system; Marketing; Physics","score_opus":0.0027922274148902398,"score_gpt":0.17391489151787518,"score_spread":0.17112266410298493,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W975443591","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.59765214,0.0006354322,0.07480655,0.000022697728,0.00022676474,0.00083339994,0.0000036060076,0.00008051401,0.3257389],"genre_scores_gemma":[0.9827915,0.0003625824,0.002639515,0.000010044504,0.0000055807973,0.000002611835,0.0005734885,0.00004234125,0.0135723585],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987264,0.00019649643,0.00027257606,0.00023748694,0.0003421715,0.00022484102],"domain_scores_gemma":[0.9989449,0.0001733277,0.00024305514,0.00048134272,0.000106725296,0.000050660317],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0003414391,0.00021166184,0.0005617124,0.0010978827,0.000041587,0.0000132946625,0.00063223625,0.00033490974,0.0011860803],"category_scores_gemma":[0.000034577813,0.00022997824,0.0002071608,0.0016252628,0.000021502536,0.00023030578,0.000011903681,0.00028791602,0.000004821642],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0038202095,0.0043347105,0.09705978,0.008066737,0.037901655,0.00035012994,0.19796789,0.01906043,0.012334501,0.006456009,0.35571212,0.25693586],"study_design_scores_gemma":[0.00025109205,0.00005822117,0.20896754,0.000044977238,0.0008764028,6.712586e-7,0.0003662942,0.78846407,0.00008721921,0.000020217873,0.0006071242,0.0002561804],"about_ca_topic_score_codex":0.0058724824,"about_ca_topic_score_gemma":0.002290448,"teacher_disagreement_score":0.76940364,"about_ca_system_score_codex":0.000116822055,"about_ca_system_score_gemma":0.00005032449,"threshold_uncertainty_score":0.99972695},"labels":[],"label_agreement":null}]}