{"meta":{"query_hash":"9840def02a5e","filters":{"topic":"Evaluation and Optimization Models"},"cohort_total":140,"direct_labels_cover":0,"predictions_cover":140,"exported":140,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/9840def02a5e","api":"https://metacan.xera.ac/api/v1/cohort?topic=Evaluation+and+Optimization+Models"},"results":[{"id":"W1491497711","doi":"10.3968/4428","title":"The Study of Performance Management Process for Agricultural Scientific Research Units","year":2014,"lang":"en","type":"article","venue":"Cross-cultural communication","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Performance management; Process (computing); Process management; Computer science; Engineering management; Complaint; Evaluation methods; Business; Engineering; Reliability engineering","score_opus":0.12723643847325203,"score_gpt":0.41373360595200936,"score_spread":0.2864971674787573,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1491497711","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":"evaluation","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":"evaluation","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20809703,0.0016480357,0.7114557,0.0035551128,0.000093450595,0.00089852355,0.00012296344,0.00021068397,0.07391845],"genre_scores_gemma":[0.91938627,0.00088356104,0.07277308,0.00008629538,0.000056292072,0.00045153845,0.00006920314,0.000055635304,0.006238071],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9867909,0.0076908823,0.00052159274,0.0011543729,0.0030537925,0.0007884706],"domain_scores_gemma":[0.98235464,0.010242892,0.00322639,0.0009782143,0.0026655444,0.00053229474],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.014937344,0.00068127597,0.00061651366,0.0021020442,0.0014000302,0.004587144,0.001328417,0.0013361152,0.0025700624],"category_scores_gemma":[0.02770547,0.00032487942,0.00072947587,0.0029603986,0.0026761694,0.005254468,0.002196789,0.0015399862,0.0004530775],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017845703,0.0006544792,0.019370748,0.00081803114,0.0001401233,0.00024735674,0.0054443814,0.24362388,0.00513133,0.5364532,0.0023383414,0.18559973],"study_design_scores_gemma":[0.000053766023,0.0011922925,0.023324938,0.00047503883,0.000096960655,0.0001933128,0.0050185663,0.5990449,0.007874949,0.3381569,0.024336746,0.0002316632],"about_ca_topic_score_codex":0.0041241446,"about_ca_topic_score_gemma":0.00200038,"teacher_disagreement_score":0.98506266,"about_ca_system_score_codex":0.0052169026,"about_ca_system_score_gemma":0.005665947,"threshold_uncertainty_score":0.078997135},"labels":[],"label_agreement":null},{"id":"W1665502464","doi":"10.3968/4922","title":"Methods on the Construction of Traffic Law Discipline","year":2014,"lang":"en","type":"article","venue":"Higher education of social science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Value (mathematics); Computer science; Key (lock); Economic Justice; Law; Sociology; Law and economics; Political science; Computer security","score_opus":0.03319284536778487,"score_gpt":0.36788178110780384,"score_spread":0.33468893574001896,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1665502464","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018034634,0.00071562675,0.95156795,0.0014831887,0.00016212281,0.00025426422,0.00013498707,0.00017556592,0.04370286],"genre_scores_gemma":[0.093979254,0.001516542,0.8884792,0.00050447445,0.00020325852,0.0016546682,0.0002928855,0.00020813185,0.013161636],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9860204,0.009581265,0.00070293003,0.0010985917,0.0023396437,0.00025711977],"domain_scores_gemma":[0.97654426,0.015584256,0.0009832255,0.0030089791,0.0035230836,0.0003562018],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016639998,0.0009096356,0.00069194235,0.006221015,0.0022915255,0.0042111524,0.001731575,0.0013095918,0.012066284],"category_scores_gemma":[0.027877368,0.0005362943,0.0012547809,0.0041710245,0.0095912395,0.0060305633,0.0038462419,0.002739971,0.0018916449],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006339858,0.0000162939,0.00023246935,0.00009298787,0.0000070741403,0.000018628192,0.0007030193,0.0009267933,0.00009003562,0.9728194,0.0012706196,0.023816256],"study_design_scores_gemma":[0.000017142584,0.000017592674,0.00022899827,0.00018164105,0.000008245796,0.00006151449,0.00036362148,0.00640534,0.0003246788,0.9468566,0.045515604,0.000019005516],"about_ca_topic_score_codex":0.00290024,"about_ca_topic_score_gemma":0.0025465547,"teacher_disagreement_score":0.016639998,"about_ca_system_score_codex":0.0039555915,"about_ca_system_score_gemma":0.005900982,"threshold_uncertainty_score":0.08800173},"labels":[],"label_agreement":null},{"id":"W1756256302","doi":"10.3968/j.aped.1925543820120401.758","title":"Fuzzy Comprehensive Evaluation in Well Control Risk Assessment Based on AHP: A Case Study","year":2012,"lang":"en","type":"article","venue":"Advances in petroleum exploration and development","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Analytic hierarchy process; Risk assessment; Delphi method; Fuzzy logic; Delphi; Control (management); Risk Control; Engineering; Risk analysis (engineering); Evaluation methods; Reliability engineering; Operations research; Computer science; Risk management; Artificial intelligence; Business","score_opus":0.037387287749257335,"score_gpt":0.3228449813506923,"score_spread":0.28545769360143497,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1756256302","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.74504775,0.00066110026,0.23916271,0.00083770114,0.00004128757,0.000799478,0.00019743989,0.00016298635,0.013089487],"genre_scores_gemma":[0.9299485,0.00027480975,0.06757385,0.000022066457,0.000009975456,0.00022949526,0.00006197167,0.000014579546,0.0018646857],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99652183,0.0019150064,0.0001245835,0.0001443618,0.0010007279,0.00029352203],"domain_scores_gemma":[0.99659085,0.0022424401,0.00019216018,0.00019926406,0.0005571911,0.0002182154],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0058750277,0.0007746938,0.00065292104,0.0019247917,0.0018764945,0.0017297281,0.0011375118,0.0019813757,0.0024254865],"category_scores_gemma":[0.006059963,0.0003934411,0.0009998921,0.0021161677,0.00092531083,0.001532887,0.0015049285,0.000886504,0.00017135116],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008944402,0.002246811,0.01930988,0.00067663856,0.00021898517,0.008473964,0.0044139423,0.736985,0.0070270025,0.040894635,0.00402592,0.17483273],"study_design_scores_gemma":[0.00015241287,0.00069114886,0.004037906,0.000097244876,0.000094674666,0.0007995241,0.0030970152,0.96787006,0.006156648,0.012040546,0.0048720515,0.00009082676],"about_ca_topic_score_codex":0.009194063,"about_ca_topic_score_gemma":0.009612016,"teacher_disagreement_score":0.009194063,"about_ca_system_score_codex":0.0024558918,"about_ca_system_score_gemma":0.002013241,"threshold_uncertainty_score":0.03107047},"labels":[],"label_agreement":null},{"id":"W1865287835","doi":"10.3968/j.ccc.1923670020060201.004","title":"Enterprise Credit Evaluating Model Study","year":2010,"lang":"en","type":"article","venue":"Cross-cultural communication","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Loan; Humanities; Gray (unit); Business; Political science; Actuarial science; Finance; Philosophy","score_opus":0.058946451313327944,"score_gpt":0.3904222304077555,"score_spread":0.33147577909442755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1865287835","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10628618,0.0016176826,0.75969136,0.00264002,0.00015369384,0.00019576192,0.00075062533,0.00040684693,0.12825786],"genre_scores_gemma":[0.9334269,0.0008848082,0.032236177,0.000103652324,0.000079565136,0.00013877808,0.00028004232,0.00004128714,0.032808788],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993273,0.00021130207,0.00003474987,0.0001410412,0.00017908825,0.00010659727],"domain_scores_gemma":[0.9989718,0.000496345,0.000098417644,0.00006433393,0.00029743626,0.000071643255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011589929,0.00062621746,0.00061515195,0.0012715929,0.00066341343,0.0023912669,0.0011341759,0.0012094738,0.00890209],"category_scores_gemma":[0.002904776,0.00020521694,0.0009798673,0.001535657,0.000759836,0.0024466012,0.0011332792,0.0010684594,0.0006751412],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040196497,0.00006780873,0.003298213,0.000111548485,0.000051651536,0.00034458222,0.00030921248,0.5243403,0.00063304254,0.4406602,0.0034554116,0.026687905],"study_design_scores_gemma":[0.0000074340546,0.000023003739,0.0005754789,0.000021885646,0.000014686884,0.00009073927,0.00006607664,0.93170047,0.00022516152,0.062382407,0.0048802104,0.000012390074],"about_ca_topic_score_codex":0.011431862,"about_ca_topic_score_gemma":0.005160678,"teacher_disagreement_score":0.011431862,"about_ca_system_score_codex":0.0022313783,"about_ca_system_score_gemma":0.0015562915,"threshold_uncertainty_score":0.029780507},"labels":[],"label_agreement":null},{"id":"W1900119982","doi":"10.3968/j.sms.1923845220130602.478","title":"Related Distribution of Prime Numbers","year":2013,"lang":"en","type":"article","venue":"Studies in mathematical sciences","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Distribution (mathematics); Mathematics; Prime (order theory); Statistics; Combinatorics","score_opus":0.06493069085448072,"score_gpt":0.3445991917351981,"score_spread":0.2796685008807174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1900119982","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.045831855,0.0030423012,0.8417779,0.004374843,0.00052724476,0.000079982834,0.0003229065,0.00015653907,0.10388652],"genre_scores_gemma":[0.85702294,0.0059877983,0.07180649,0.00084003975,0.0009313592,0.0002071622,0.00037327447,0.00019456226,0.06263638],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.998933,0.0004009733,0.000034910383,0.00022277527,0.00028069277,0.00012762516],"domain_scores_gemma":[0.996711,0.0018998648,0.0002785384,0.00026539923,0.00063636067,0.00020885869],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020214366,0.0006898275,0.0010146265,0.0023888918,0.0009977126,0.0025477987,0.0015313013,0.0013545841,0.013436887],"category_scores_gemma":[0.011841699,0.0003622499,0.0007381893,0.0028404451,0.0028870956,0.005803305,0.0015001299,0.0024128535,0.0014517833],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000062885606,0.0000058114547,0.00008266973,0.000020315507,0.0000031615562,0.000020424703,0.000027746299,0.005287403,0.00011407944,0.9908806,0.0008731681,0.0026782632],"study_design_scores_gemma":[0.000005701851,0.000006687049,0.000059633086,0.00001097142,0.0000032017936,0.00003453221,0.000019045852,0.032199975,0.00010651216,0.9647834,0.0027652364,0.000005192659],"about_ca_topic_score_codex":0.001324138,"about_ca_topic_score_gemma":0.0006200026,"teacher_disagreement_score":0.013436887,"about_ca_system_score_codex":0.003150265,"about_ca_system_score_gemma":0.0010959911,"threshold_uncertainty_score":0.044950843},"labels":[],"label_agreement":null},{"id":"W1968881952","doi":"10.5430/jms.v2n3p102","title":"Group Identification Method for Features of Human Capital Inner Quality Structure","year":2011,"lang":"en","type":"article","venue":"Journal of Management and Strategy","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Identification (biology); Observer (physics); Quality (philosophy); Human capital; Group (periodic table); Computer science; Artificial intelligence; Economics; Epistemology; Ecology; Biology","score_opus":0.061323572739091066,"score_gpt":0.33531907689587553,"score_spread":0.2739955041567845,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968881952","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009564786,0.000037935293,0.98844945,0.000078525685,0.000013108949,0.000048106,0.000016361702,0.000054484528,0.0017371881],"genre_scores_gemma":[0.7394242,0.00014285702,0.2555519,0.000048666538,0.000037132457,0.00043815197,0.00009748528,0.000038790724,0.004220813],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99830544,0.0008055934,0.00005675059,0.0002938209,0.00042191264,0.00011645576],"domain_scores_gemma":[0.99802667,0.0010292217,0.0002603869,0.00014173903,0.0004634065,0.000078507335],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027895933,0.00058672763,0.0008831127,0.0013640021,0.00061247405,0.0010078206,0.000974067,0.00089971296,0.0032884378],"category_scores_gemma":[0.006686134,0.00022077953,0.00093646883,0.0008894235,0.0008133627,0.001976011,0.0011337326,0.0010761557,0.00034297368],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016674434,0.00017186535,0.006762723,0.00022776712,0.00019788335,0.00018408889,0.0011703612,0.5563536,0.0041068383,0.22639486,0.0028595193,0.20140374],"study_design_scores_gemma":[0.000011329096,0.000053774475,0.0009113049,0.000011862899,0.000019798927,0.00003285491,0.0000853374,0.9650392,0.00058954,0.032336622,0.0008875429,0.000020943646],"about_ca_topic_score_codex":0.0031378635,"about_ca_topic_score_gemma":0.0019810533,"teacher_disagreement_score":0.0032884378,"about_ca_system_score_codex":0.0013633105,"about_ca_system_score_gemma":0.0014407391,"threshold_uncertainty_score":0.014752924},"labels":[],"label_agreement":null},{"id":"W1976229691","doi":"10.4028/www.scientific.net/amm.584-586.439","title":"Shanghai West Railway Station’s Design Based on Communication Space and Ecological Integration","year":2014,"lang":"en","type":"article","venue":"Applied Mechanics and Materials","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Adidas (Canada)","funders":"","keywords":"Transport engineering; Service (business); Order (exchange); Space (punctuation); Engineering; Business; Civil engineering; Geography; Computer science; Marketing","score_opus":0.022719727202114088,"score_gpt":0.22961852750896078,"score_spread":0.20689880030684668,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1976229691","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29892236,0.0011812804,0.5256401,0.0007094198,0.00033045874,0.00026506706,0.0005793203,0.0013560273,0.17101593],"genre_scores_gemma":[0.91860086,0.00057285494,0.04258136,0.00006900838,0.000035929756,0.00018412856,0.00031663218,0.00011071059,0.037528444],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997284,0.00005998423,0.000012039368,0.000048413636,0.000096277334,0.000054893175],"domain_scores_gemma":[0.9999161,0.000007637704,0.000010479622,0.000009317925,0.000041417956,0.000015081132],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023108016,0.0009324338,0.0002837608,0.00079067366,0.00067607895,0.0012374151,0.00065587385,0.00047781423,0.005408634],"category_scores_gemma":[0.00018806587,0.00028702506,0.0005194868,0.0007754125,0.0004043217,0.0006756567,0.0006854074,0.0002812001,0.00093874417],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030623615,0.00017103733,0.011896837,0.00050125876,0.00010728996,0.0010089995,0.0005861127,0.68239886,0.058283225,0.079603605,0.010547112,0.15458949],"study_design_scores_gemma":[0.00012900608,0.0008981798,0.025601098,0.00011229308,0.00043953743,0.00082773087,0.0015083554,0.80045044,0.020386674,0.012490177,0.13698556,0.00017095482],"about_ca_topic_score_codex":0.013653046,"about_ca_topic_score_gemma":0.027004898,"teacher_disagreement_score":0.013653046,"about_ca_system_score_codex":0.0009839146,"about_ca_system_score_gemma":0.0017242474,"threshold_uncertainty_score":0.027147114},"labels":[],"label_agreement":null},{"id":"W1979813467","doi":"10.5539/ibr.v4n4p272","title":"Comparative Study on the Evaluation Methods of Product Quality Level","year":2011,"lang":"en","type":"article","venue":"International Business Research","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Quality (philosophy); Product (mathematics); Evaluation methods; Premise; Computer science; Reliability engineering; Mathematics; Engineering","score_opus":0.840939366611223,"score_gpt":0.6223706142575637,"score_spread":0.21856875235365936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1979813467","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32819688,0.047688182,0.5856395,0.001241213,0.00064285955,0.0006954576,0.00047954166,0.00084495207,0.034571383],"genre_scores_gemma":[0.78272355,0.0071151853,0.20648725,0.00013298648,0.00020750302,0.00039142257,0.0003433086,0.0001802247,0.0024185758],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9495765,0.028279947,0.0027448053,0.0018405394,0.017041495,0.00051680155],"domain_scores_gemma":[0.9004575,0.06589155,0.0036791041,0.0038057594,0.025600554,0.0005656271],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03404131,0.0009124815,0.0009458322,0.007064728,0.0005087146,0.002142347,0.001137254,0.0010911667,0.001430583],"category_scores_gemma":[0.08532757,0.00037684443,0.0012619596,0.004834631,0.0006507604,0.00357951,0.0010804264,0.00077643653,0.0002656319],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021782795,0.00043869647,0.032178618,0.0026901865,0.0010129143,0.00020341638,0.0018662689,0.013382894,0.009742485,0.013208524,0.004166557,0.9189311],"study_design_scores_gemma":[0.0009879834,0.0060291956,0.23039311,0.0031560133,0.003494311,0.002952792,0.0058774245,0.59404767,0.064556554,0.024206694,0.063265294,0.0010329519],"about_ca_topic_score_codex":0.0022836383,"about_ca_topic_score_gemma":0.0022025828,"teacher_disagreement_score":0.03404131,"about_ca_system_score_codex":0.00153433,"about_ca_system_score_gemma":0.0008304019,"threshold_uncertainty_score":0.18002981},"labels":[],"label_agreement":null},{"id":"W1980547566","doi":"10.5539/ibr.v2n4p184","title":"Analysis of the Implementation of Fair Value in China","year":2009,"lang":"en","type":"article","venue":"International Business Research","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Fair value; China; Accounting; Business; Value (mathematics); Profit (economics); Listed company; Economics; Statistics; Mathematics; Microeconomics; Geography","score_opus":0.05327556529530778,"score_gpt":0.42007525155503184,"score_spread":0.36679968625972403,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1980547566","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99517065,0.000109026994,0.0019395272,0.00016734166,0.000003440068,0.00003241329,0.000070802336,0.000012793244,0.0024939554],"genre_scores_gemma":[0.99895227,0.000046338286,0.00041721205,0.000012801715,0.000002180911,0.00001158393,0.00006897513,0.000001788816,0.00048679582],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99629253,0.0007977894,0.00020722578,0.000318403,0.001548738,0.00083529827],"domain_scores_gemma":[0.99214137,0.0023547998,0.0022652228,0.00065701065,0.0021534332,0.00042816173],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0056009754,0.00029642304,0.00046837336,0.0019059115,0.00077263796,0.0016999568,0.0007227252,0.00046223373,0.0008475899],"category_scores_gemma":[0.00999126,0.00023348932,0.00048047258,0.0024465583,0.0010807825,0.0016645485,0.00096368004,0.0005853563,0.000049706712],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003607084,0.0002900818,0.7932613,0.00014786003,0.0002167515,0.00089051866,0.0030874924,0.06582034,0.0029004763,0.048266847,0.0016086673,0.08314899],"study_design_scores_gemma":[0.000038831342,0.00023732925,0.8571464,0.00003264729,0.00010471413,0.00007478487,0.001475591,0.12881848,0.002738358,0.0063175242,0.0029493417,0.00006605648],"about_ca_topic_score_codex":0.08035024,"about_ca_topic_score_gemma":0.04847745,"teacher_disagreement_score":0.08035024,"about_ca_system_score_codex":0.007976414,"about_ca_system_score_gemma":0.0057574785,"threshold_uncertainty_score":0.15976512},"labels":[],"label_agreement":null},{"id":"W1982911282","doi":"10.1061/41042(349)16","title":"Decision-Making Model of Highway Route Plan Based on Entropy and Entropy Weight Theory","year":2009,"lang":"en","type":"article","venue":"","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Intertek (Canada)","funders":"Natural Science Foundation of Hunan Province; National Natural Science Foundation of China","keywords":"Entropy (arrow of time); Computer science; Plan (archaeology); Generalized entropy index; Operations research; Decision matrix; Index (typography); Decision model; Data mining; Decision-making models; Management science; Artificial intelligence; Mathematics; Machine learning; Engineering","score_opus":0.013811065598740912,"score_gpt":0.241392207179378,"score_spread":0.2275811415806371,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1982911282","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03746141,0.0002557552,0.9507486,0.0004648283,0.000044841785,0.0001603205,0.00022533796,0.00008287136,0.010556057],"genre_scores_gemma":[0.8677781,0.000609281,0.12489742,0.000058790305,0.000057830403,0.00044604868,0.00034240255,0.00002856314,0.005781516],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99851793,0.00056704966,0.00007893428,0.00022259608,0.0004953292,0.000118195756],"domain_scores_gemma":[0.9992118,0.00037853615,0.0000997787,0.00003290252,0.00022564638,0.00005129789],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017211755,0.00070965925,0.00068908435,0.0013194901,0.0005441137,0.0016869626,0.0009397935,0.00058768975,0.0036071849],"category_scores_gemma":[0.002675752,0.00028002722,0.0007916722,0.0012308488,0.000778895,0.002352447,0.00070545095,0.00074215484,0.00023957352],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006219784,0.000036121735,0.0016782692,0.00011109684,0.000066717985,0.000113499555,0.0001935949,0.85229516,0.0010034026,0.11649992,0.0013797367,0.026560219],"study_design_scores_gemma":[0.000012236781,0.00003101507,0.00042718934,0.000012942354,0.000018458953,0.000024308376,0.00004911687,0.95248157,0.000330823,0.04582727,0.00076750416,0.000017580394],"about_ca_topic_score_codex":0.0056330715,"about_ca_topic_score_gemma":0.0042782086,"teacher_disagreement_score":0.0056330715,"about_ca_system_score_codex":0.0021924775,"about_ca_system_score_gemma":0.0017493347,"threshold_uncertainty_score":0.015907645},"labels":[],"label_agreement":null},{"id":"W1984721568","doi":"10.5539/ass.v4n11p156","title":"The Review on Non-linear Analysis and Forecasting Methods of the Real Estate Market in China","year":2009,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Shanghai Municipal Education Commission","keywords":"Premise; Real estate; China; Market analysis; Computer science; Econometrics; Operations research; Economics; Finance; Mathematics; Management; Political science","score_opus":0.029358317246212958,"score_gpt":0.3582609570738504,"score_spread":0.32890263982763746,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1984721568","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027981687,0.6265889,0.31454626,0.003796356,0.0020762854,0.00009495104,0.00042577897,0.00026582688,0.024224002],"genre_scores_gemma":[0.26995942,0.6315188,0.07824352,0.00058283826,0.002332506,0.0001611537,0.00065391173,0.000073576644,0.016474267],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99919134,0.00022328088,0.00010690089,0.000092130955,0.00035695295,0.000029373952],"domain_scores_gemma":[0.99910814,0.0004834606,0.000058979873,0.000037425336,0.00029581285,0.000016152057],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016568122,0.0005646567,0.0007338858,0.0015397033,0.00026688343,0.0009142246,0.0006932456,0.0004936711,0.0015688564],"category_scores_gemma":[0.0023569772,0.00020198898,0.00058356434,0.002970503,0.00036557415,0.0013383037,0.0002619597,0.00031180232,0.00039463714],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060415252,0.000051141124,0.005107528,0.004208237,0.00017647448,0.0002094114,0.00021510651,0.03235055,0.0016516659,0.027491143,0.015774697,0.91270363],"study_design_scores_gemma":[0.00005483859,0.00031691144,0.05852861,0.002343239,0.0005740055,0.0009155326,0.00066911685,0.39975783,0.007883635,0.0687249,0.45999536,0.00023603294],"about_ca_topic_score_codex":0.010400223,"about_ca_topic_score_gemma":0.008009371,"teacher_disagreement_score":0.010400223,"about_ca_system_score_codex":0.0007772216,"about_ca_system_score_gemma":0.0015971694,"threshold_uncertainty_score":0.020679414},"labels":[],"label_agreement":null},{"id":"W1989217337","doi":"10.4028/www.scientific.net/amr.726-731.4086","title":"Highway Construction Based on Sustainable Concept","year":2013,"lang":"en","type":"article","venue":"Advanced materials research","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Sustainable development; Construction engineering; Harmony (color); Road construction; Process (computing); Civil engineering; Highway engineering; Engineering; Social harmony; Transport engineering; Computer science","score_opus":0.03028721769690733,"score_gpt":0.32637312207625496,"score_spread":0.2960859043793476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1989217337","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.053293023,0.006843893,0.5428284,0.0027016927,0.0005844554,0.00017606717,0.00037532102,0.0003162968,0.39288083],"genre_scores_gemma":[0.84364945,0.009203991,0.083957925,0.00037228822,0.00030786832,0.00036304325,0.0003723447,0.000115637165,0.06165743],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.999495,0.00009774493,0.000015835372,0.000063774336,0.0002745073,0.000053088843],"domain_scores_gemma":[0.9998628,0.000018783225,0.000016568441,0.000013839966,0.00007233382,0.000015620551],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035413238,0.00035432453,0.00026331513,0.0010925782,0.0005609639,0.0011113685,0.00050019805,0.000496144,0.0047682817],"category_scores_gemma":[0.0004462913,0.00016377612,0.00047412066,0.000856446,0.0010321381,0.0011927027,0.0012042801,0.0005274797,0.00056932424],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011393947,0.000023094351,0.00075633393,0.00021391021,0.000016126638,0.000102526465,0.00009460668,0.04846156,0.0020928516,0.90136874,0.005057929,0.041800927],"study_design_scores_gemma":[0.000024069997,0.00013001969,0.0024749583,0.00020157597,0.000049127895,0.00060406706,0.00032738314,0.15318558,0.003424209,0.67180246,0.16770467,0.00007176803],"about_ca_topic_score_codex":0.0022880351,"about_ca_topic_score_gemma":0.002621148,"teacher_disagreement_score":0.0047682817,"about_ca_system_score_codex":0.00095354806,"about_ca_system_score_gemma":0.001396544,"threshold_uncertainty_score":0.015951514},"labels":[],"label_agreement":null},{"id":"W1990451305","doi":"10.4236/ti.2011.21005","title":"Evaluation on Information Technology Service Management Process with AHP","year":2011,"lang":"en","type":"article","venue":"Technology and Investment","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Natural Science Foundation of China; National Science Foundation","keywords":"Analytic hierarchy process; Process management; Service (business); Service management; Computer science; Knowledge management; Service design; Service product management; Process (computing); Service delivery framework; Business; Operations research; Marketing; Supply chain management; Engineering","score_opus":0.023599332348452226,"score_gpt":0.23430730452679402,"score_spread":0.2107079721783418,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1990451305","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44876796,0.00045856347,0.51500803,0.00082202454,0.00013223653,0.002077077,0.00028174458,0.0004333608,0.032018974],"genre_scores_gemma":[0.8290688,0.00021492266,0.16839513,0.000042174364,0.000019954692,0.00063777,0.00019446666,0.000037962087,0.0013888908],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9825716,0.0106555205,0.0006899188,0.00041095246,0.004912883,0.0007591887],"domain_scores_gemma":[0.9864782,0.008164463,0.0006082133,0.0005120546,0.0039502084,0.0002868922],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014626132,0.00066049653,0.0006277179,0.0035804214,0.0015926568,0.0020372886,0.000695089,0.0005919267,0.0029852604],"category_scores_gemma":[0.021979824,0.00022284959,0.0007756848,0.0036099742,0.0007187791,0.0016380193,0.0012666995,0.0007539026,0.00029589786],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018497059,0.0012681433,0.015935415,0.0015271134,0.0002108358,0.00026251114,0.0054689907,0.25660297,0.010009698,0.04585442,0.0030962615,0.6579139],"study_design_scores_gemma":[0.00018561997,0.0012869464,0.006767498,0.0002559551,0.000112800335,0.000083468076,0.0056552165,0.9429561,0.017821504,0.018788094,0.0060163336,0.00007051591],"about_ca_topic_score_codex":0.005775163,"about_ca_topic_score_gemma":0.003865928,"teacher_disagreement_score":0.014626132,"about_ca_system_score_codex":0.0030982927,"about_ca_system_score_gemma":0.003347029,"threshold_uncertainty_score":0.07735127},"labels":[],"label_agreement":null},{"id":"W1991319110","doi":"10.5539/ass.v7n8p154","title":"A Study on the Method of HSE Risk Management of Engineering Projects","year":2011,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Checklist; Risk analysis (engineering); Action (physics); Risk management; Computer science; Business; Operations management; Construction engineering; Engineering; Psychology","score_opus":0.07070444100264674,"score_gpt":0.3226509809008537,"score_spread":0.251946539898207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1991319110","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046611425,0.00088429195,0.94039357,0.0005718619,0.0000966462,0.0003796291,0.000105099825,0.00017890637,0.010778446],"genre_scores_gemma":[0.4610349,0.0011417682,0.53057635,0.00008133908,0.00009439737,0.00057025516,0.00018647505,0.000107627886,0.006206929],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98941994,0.0064539444,0.00036790004,0.000805109,0.002766181,0.00018688744],"domain_scores_gemma":[0.98357105,0.011124569,0.0010303296,0.0010158545,0.0030125282,0.00024572006],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007544795,0.00061693776,0.0006930055,0.0018266245,0.000599994,0.0022162166,0.0012724476,0.00080634904,0.0029690403],"category_scores_gemma":[0.025596246,0.0003232725,0.0009078489,0.0016000675,0.0006985116,0.0027701857,0.0009864466,0.0013776309,0.00032628054],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033245434,0.00061112316,0.019325659,0.00080331473,0.000400431,0.0002757655,0.002148429,0.17466737,0.0048913197,0.18467863,0.004554394,0.6073111],"study_design_scores_gemma":[0.000059812224,0.00039368527,0.008531448,0.00016278865,0.00013036275,0.00035233845,0.0007775238,0.9188653,0.003641143,0.04985218,0.017120814,0.000112535985],"about_ca_topic_score_codex":0.0051727174,"about_ca_topic_score_gemma":0.0032742056,"teacher_disagreement_score":0.007544795,"about_ca_system_score_codex":0.0019628352,"about_ca_system_score_gemma":0.0018371859,"threshold_uncertainty_score":0.039901197},"labels":[],"label_agreement":null},{"id":"W1997902238","doi":"10.4028/www.scientific.net/amr.429.200","title":"Study on Safety Assessment Modeling in Sijiaying Open-Pit Iron Mine","year":2012,"lang":"en","type":"article","venue":"Advanced materials research","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Iron Ore Company (Canada)","funders":"","keywords":"Mine safety; Statistic; Analytic hierarchy process; Engineering; Membership function; Fuzzy logic; Data mining; Open-pit mining; Process (computing); Fuzzy set; Mining engineering; Computer science; Mathematics; Operations research; Statistics; Artificial intelligence; Waste management","score_opus":0.25393371532478115,"score_gpt":0.4847107169758679,"score_spread":0.23077700165108672,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1997902238","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7706282,0.00032463516,0.21577698,0.00040771082,0.00001944202,0.00006935735,0.00010288921,0.00011427267,0.012556467],"genre_scores_gemma":[0.9918772,0.00015397723,0.0052955933,0.00001145344,0.0000055227356,0.000027202503,0.000037946364,0.0000072310104,0.0025839715],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997645,0.000070728114,0.000012560649,0.00004077447,0.0000750907,0.00003635272],"domain_scores_gemma":[0.99965715,0.00013497859,0.00004629167,0.000010409563,0.00012925029,0.000021878777],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005642435,0.0004040354,0.0004218694,0.0005795443,0.0004860874,0.0008022185,0.0007399078,0.000832081,0.001627511],"category_scores_gemma":[0.00095942966,0.0002782171,0.00055724796,0.000397271,0.00031643207,0.0010666812,0.00043939098,0.00036259423,0.000117539756],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000064318156,0.00006222229,0.0082653165,0.00009160304,0.000023509145,0.00036983506,0.00033975116,0.96823555,0.003099309,0.007177855,0.00038839693,0.01188235],"study_design_scores_gemma":[0.0000031476068,0.000030438005,0.00096481194,0.000004993237,0.0000073363085,0.000024650717,0.000082138264,0.99699473,0.00041938305,0.0012574516,0.00020618389,0.000004659147],"about_ca_topic_score_codex":0.015743101,"about_ca_topic_score_gemma":0.010258687,"teacher_disagreement_score":0.015743101,"about_ca_system_score_codex":0.0007960883,"about_ca_system_score_gemma":0.0011367963,"threshold_uncertainty_score":0.03130293},"labels":[],"label_agreement":null},{"id":"W2004242465","doi":"10.4028/www.scientific.net/amm.281.677","title":"Enterprise Quality Credit Rating System Building","year":2013,"lang":"en","type":"article","venue":"Applied Mechanics and Materials","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"123 Certification (Canada)","funders":"","keywords":"Credit rating; Quality (philosophy); Rating system; Order (exchange); Subject (documents); Computer science; China; Risk analysis (engineering); Business; Actuarial science; Finance; Economics; Environmental economics; World Wide Web; Political science","score_opus":0.01626947473563827,"score_gpt":0.23981439616726735,"score_spread":0.22354492143162907,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2004242465","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07999735,0.0014310998,0.7920296,0.002931608,0.00048799595,0.0011174856,0.0019389647,0.0033503901,0.116715536],"genre_scores_gemma":[0.84936285,0.0010239863,0.12993261,0.0002009919,0.00021576344,0.00027331247,0.0022343767,0.00013852307,0.016617594],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9937781,0.0018421987,0.0006342141,0.0011957227,0.002135958,0.00041388144],"domain_scores_gemma":[0.99384755,0.0010038336,0.0007327343,0.00087559095,0.0031380483,0.0004021295],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0058718678,0.00038990407,0.00058663986,0.0019295941,0.0010085265,0.003590916,0.0012351443,0.0008617571,0.008279096],"category_scores_gemma":[0.011206787,0.00019685045,0.00052815484,0.0034667149,0.00065353676,0.0039019033,0.001477307,0.00110588,0.0023634746],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029751292,0.00034629973,0.03596208,0.0007112089,0.00012164113,0.0002637624,0.00072771864,0.0394612,0.0066461707,0.24658781,0.048500504,0.620374],"study_design_scores_gemma":[0.00016016685,0.00052830117,0.048639275,0.00031626478,0.00022070312,0.0007758104,0.0009731918,0.52042776,0.02219409,0.103195466,0.30226526,0.0003037801],"about_ca_topic_score_codex":0.0063020494,"about_ca_topic_score_gemma":0.0028613396,"teacher_disagreement_score":0.008279096,"about_ca_system_score_codex":0.0021692323,"about_ca_system_score_gemma":0.0029849724,"threshold_uncertainty_score":0.031053722},"labels":[],"label_agreement":null},{"id":"W2005873781","doi":"10.1108/02656710610704258","title":"ISO 10002 Complaints Handling System: a study","year":2006,"lang":"en","type":"article","venue":"International Journal of Quality & Reliability Management","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"China Scholarship Council","keywords":"Complaint; Context (archaeology); Customer satisfaction; Quality management system; Operations management; Standard system; Business; Quality (philosophy); Quality management; Risk analysis (engineering); Engineering; Management system; Marketing; Construction engineering","score_opus":0.028060000554880993,"score_gpt":0.3186570675725013,"score_spread":0.2905970670176203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005873781","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99241215,0.0001664358,0.00071171933,0.00011486386,0.000011249603,0.00012646092,0.00016856608,0.000011516621,0.0062770685],"genre_scores_gemma":[0.99621993,0.00024383156,0.00070210255,0.00007801497,0.0000244814,0.000072524235,0.00048835395,0.0000067350115,0.002164158],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9970728,0.001133163,0.00023197052,0.00020853995,0.0011135233,0.00024001245],"domain_scores_gemma":[0.99319756,0.0028649718,0.0011950493,0.0003979061,0.0021213675,0.00022320359],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024001158,0.00021999657,0.00026499017,0.0016958645,0.000961267,0.0015355123,0.00047331303,0.0006732649,0.0014411543],"category_scores_gemma":[0.0059096627,0.00014947222,0.00040086877,0.0029483065,0.0006335905,0.0011863778,0.0005309274,0.0005773657,0.0005586351],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015033453,0.012166685,0.7788506,0.001160418,0.00013188699,0.0061756386,0.02850871,0.0050335713,0.010970393,0.009409471,0.01029963,0.13578968],"study_design_scores_gemma":[0.00011094992,0.005719623,0.86536473,0.00021506603,0.00016930094,0.004411091,0.04960384,0.014313467,0.009549553,0.0010634674,0.049383264,0.00009564646],"about_ca_topic_score_codex":0.011440477,"about_ca_topic_score_gemma":0.007822584,"teacher_disagreement_score":0.011440477,"about_ca_system_score_codex":0.0016179534,"about_ca_system_score_gemma":0.0014332114,"threshold_uncertainty_score":0.022747815},"labels":[],"label_agreement":null},{"id":"W2012284576","doi":"10.5539/ass.v8n8p155","title":"The Construction of Indicator System for Performance Measurement of Chinese Enterprises Based on Balanced Scorecard","year":2012,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Balanced scorecard; Business; Construct (python library); China; Face (sociological concept); Performance measurement; Perspective (graphical); Set (abstract data type); Chinese economy; Process management; Accounting; Industrial organization; Risk analysis (engineering); Computer science; Marketing","score_opus":0.01807320535535973,"score_gpt":0.2566821170943977,"score_spread":0.23860891173903798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2012284576","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26646206,0.0010062872,0.68463564,0.0016534764,0.00040101004,0.002592299,0.0019320868,0.0006105903,0.04070653],"genre_scores_gemma":[0.745362,0.0006197571,0.24837515,0.000104408624,0.00006244175,0.0012993027,0.0020615763,0.000035587804,0.0020797816],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99148315,0.0032240709,0.0012096729,0.00052606285,0.0031076735,0.0004493413],"domain_scores_gemma":[0.9952378,0.00091144245,0.0005655099,0.00023921822,0.002836338,0.00020958918],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008200043,0.0009420086,0.0009929016,0.0067034853,0.0011048344,0.0033823573,0.0008286009,0.00054570404,0.0011127383],"category_scores_gemma":[0.013039697,0.00028228856,0.00056908635,0.009940792,0.001072762,0.002990873,0.0018540527,0.0008746964,0.00024682918],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030835578,0.00031775094,0.13832773,0.0010550083,0.0002848073,0.00028369148,0.0027424633,0.03192016,0.007464143,0.14986458,0.014373702,0.6530577],"study_design_scores_gemma":[0.00030304122,0.0011989772,0.297215,0.0008222328,0.0005916038,0.00043813285,0.0051939706,0.5059245,0.020425588,0.099672966,0.067721926,0.000492028],"about_ca_topic_score_codex":0.010988549,"about_ca_topic_score_gemma":0.007651451,"teacher_disagreement_score":0.010988549,"about_ca_system_score_codex":0.0048316033,"about_ca_system_score_gemma":0.0075118146,"threshold_uncertainty_score":0.04336655},"labels":[],"label_agreement":null},{"id":"W2012495292","doi":"10.5539/ibr.v2n1p210","title":"The Implication of Fuzzy Comprehensive Evaluation Method in Evaluating Internal Financial Control of Enterprise","year":2009,"lang":"en","type":"article","venue":"International Business Research","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Control (management); Enterprise planning system; Control environment; Internal control; Enterprise life cycle; Fuzzy logic; Corporate governance; Accounting; Finance; Process management; Computer science; Economics; Internal audit; Management","score_opus":0.09707591072848668,"score_gpt":0.45834157467489084,"score_spread":0.36126566394640414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2012495292","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.054901995,0.0017762249,0.91734135,0.0009831432,0.00018705231,0.00018529192,0.000115585506,0.00014072197,0.024368608],"genre_scores_gemma":[0.83363426,0.0009399587,0.16192643,0.000110359826,0.00010082876,0.00019189269,0.00008464922,0.000020715934,0.0029908998],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99629384,0.0015244659,0.00018962851,0.00026909218,0.0015405982,0.00018229666],"domain_scores_gemma":[0.99749786,0.0011499643,0.00012402439,0.00008888891,0.0010105122,0.00012871233],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0050787185,0.0005331064,0.00061372307,0.0023674166,0.0006725678,0.0020353894,0.00054285023,0.000729185,0.0015509622],"category_scores_gemma":[0.0100419205,0.00015848971,0.0005036377,0.0019424444,0.0010005983,0.00257744,0.000662074,0.00068011734,0.0001313275],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003412626,0.000216171,0.010871485,0.00065442204,0.0002779757,0.00046009358,0.001452858,0.18280008,0.009304616,0.2930245,0.0114952205,0.48910132],"study_design_scores_gemma":[0.000059871978,0.00029435277,0.007997943,0.0001692258,0.00012191121,0.0002445356,0.00048622687,0.85731924,0.0041737934,0.12197864,0.007005204,0.00014906719],"about_ca_topic_score_codex":0.006311666,"about_ca_topic_score_gemma":0.006394422,"teacher_disagreement_score":0.006311666,"about_ca_system_score_codex":0.0018349548,"about_ca_system_score_gemma":0.0018394365,"threshold_uncertainty_score":0.026859164},"labels":[],"label_agreement":null},{"id":"W2019718377","doi":"10.1016/j.proeng.2011.08.845","title":"The Application of Principal Component Analysis on Financial Analysis in Real Estate Listed Company","year":2011,"lang":"en","type":"article","venue":"Procedia Engineering","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Principal component analysis; Real estate; Financial analysis; Business; Finance; Financial ratio; Accounting; Quarter (Canadian coin); Computer science; Artificial intelligence; Geography","score_opus":0.022891168073232628,"score_gpt":0.24232711238499408,"score_spread":0.21943594431176144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2019718377","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3029166,0.0024517155,0.6737267,0.0011696776,0.00043659165,0.0004088251,0.00058850093,0.0010352032,0.017266262],"genre_scores_gemma":[0.7993737,0.0022099982,0.19434205,0.00006004087,0.00017224479,0.00021347265,0.00048692626,0.00009245451,0.0030490865],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9980654,0.0011035292,0.00008997655,0.00012978402,0.0005181023,0.00009315482],"domain_scores_gemma":[0.99818534,0.00087419647,0.00009364463,0.000107714644,0.0006984633,0.00004065408],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017678755,0.0005854311,0.00044863537,0.0024248173,0.0005930668,0.0014719344,0.00030699727,0.0003339973,0.0015291338],"category_scores_gemma":[0.00611049,0.00018980101,0.0005577421,0.0035872173,0.000326588,0.0007629647,0.000632749,0.0005383857,0.00041581554],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028091637,0.0002576349,0.038849115,0.00037470824,0.0003699354,0.00027940067,0.00082592614,0.07145617,0.0058005434,0.023953453,0.008956609,0.84859556],"study_design_scores_gemma":[0.000029689003,0.00033401785,0.10711207,0.00014382282,0.00028787853,0.00029893804,0.0009949432,0.8355658,0.009393882,0.027317973,0.018383147,0.00013772825],"about_ca_topic_score_codex":0.007835571,"about_ca_topic_score_gemma":0.0061019245,"teacher_disagreement_score":0.007835571,"about_ca_system_score_codex":0.00048976816,"about_ca_system_score_gemma":0.0013490944,"threshold_uncertainty_score":0.015579939},"labels":[],"label_agreement":null},{"id":"W2037997525","doi":"10.5539/mas.v3n6p67","title":"Stock Investment Value Study Based on Fuzzy Comprehensive Evaluation","year":2009,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Investment value; Fuzzy logic; Investment (military); Stock (firearms); Index (typography); Value (mathematics); Business; Actuarial science; Operations research; Computer science; Finance; Statistics; Mathematics; Artificial intelligence; Engineering","score_opus":0.049178702307420816,"score_gpt":0.3023430939142832,"score_spread":0.2531643916068624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2037997525","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71759313,0.00063447386,0.26651272,0.00020390218,0.000017944085,0.000058285284,0.00010672423,0.000078385885,0.014794332],"genre_scores_gemma":[0.99334705,0.00011175967,0.0058266125,0.0000039734136,0.000004275733,0.000010188618,0.00003174806,0.0000027557885,0.00066156435],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995221,0.00010526503,0.000020885404,0.00004113857,0.00025671473,0.000053932607],"domain_scores_gemma":[0.99956757,0.00016632285,0.00005192086,0.00002130663,0.00016366152,0.000029225737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00081035064,0.00032034135,0.00032091571,0.001526034,0.00024782383,0.0010520768,0.00029804936,0.0002522228,0.0009079618],"category_scores_gemma":[0.001912228,0.00012008928,0.00034902708,0.0009283862,0.0003151048,0.0013915078,0.0003575587,0.0002040776,0.000049423965],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017287982,0.00008118129,0.028223585,0.00014321269,0.00015402681,0.00043960966,0.00039490094,0.77217543,0.009136999,0.08889155,0.0011942185,0.09899238],"study_design_scores_gemma":[0.0000073255906,0.00008063835,0.0060655284,0.00001330852,0.00002677472,0.000045539775,0.000098855766,0.98067975,0.0025087302,0.009785598,0.00067246286,0.00001548057],"about_ca_topic_score_codex":0.003882739,"about_ca_topic_score_gemma":0.0033323097,"teacher_disagreement_score":0.003882739,"about_ca_system_score_codex":0.0010442735,"about_ca_system_score_gemma":0.00050320366,"threshold_uncertainty_score":0.0077202916},"labels":[],"label_agreement":null},{"id":"W2038885350","doi":"10.5539/jas.v3n3p251","title":"Farmers Involved in the Production of Agricultural Standardization Factors Analysis","year":2011,"lang":"en","type":"article","venue":"Journal of Agricultural Science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Standardization; Production (economics); Agriculture; Logistic regression; Agricultural productivity; Business; Agricultural science; Agricultural economics; Computer science; Geography; Environmental science; Economics","score_opus":0.034347492055571596,"score_gpt":0.24696638518737857,"score_spread":0.21261889313180699,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2038885350","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99851173,0.000032583735,0.00053117104,0.000042735162,0.000002042585,0.000017235454,0.00006115641,0.000002942832,0.000798414],"genre_scores_gemma":[0.9988611,0.000035254736,0.00035923035,0.000005032985,0.0000024724493,0.000010440271,0.00008399116,5.694166e-7,0.00064193946],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.998678,0.000383767,0.000093905,0.00018077719,0.0003870334,0.00027647105],"domain_scores_gemma":[0.99822885,0.00052603777,0.00047616466,0.000116724565,0.0004792425,0.00017310891],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011565192,0.00029565816,0.00021601286,0.001095262,0.0010239322,0.0005668141,0.0002822619,0.00018574287,0.0034496463],"category_scores_gemma":[0.002751037,0.00014542136,0.00034676018,0.0015178872,0.00032035506,0.00039401802,0.00044336906,0.00018363394,0.00019236503],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037871352,0.00007123065,0.97841805,0.00002853869,0.000028131282,0.00025316613,0.0026868659,0.00034928543,0.0008769599,0.00018736516,0.00018025108,0.016882377],"study_design_scores_gemma":[0.0000038425537,0.000095027186,0.9843503,0.000013962464,0.00003674864,0.00013381378,0.011106636,0.0012482837,0.00085967814,0.00023346777,0.00190648,0.000011766884],"about_ca_topic_score_codex":0.019851215,"about_ca_topic_score_gemma":0.02595432,"teacher_disagreement_score":0.019851215,"about_ca_system_score_codex":0.00065568136,"about_ca_system_score_gemma":0.0012913592,"threshold_uncertainty_score":0.03947133},"labels":[],"label_agreement":null},{"id":"W2039775390","doi":"10.5539/cis.v1n1p81","title":"Peak Load Shifting Distribution of Multi-zone Fuzzy Group Decision-Making","year":2008,"lang":"en","type":"article","venue":"Computer and Information Science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Limiting; Analytic hierarchy process; Fuzzy logic; Hierarchy; Power (physics); Basis (linear algebra); Group decision-making; Mathematical optimization; Distribution (mathematics); Process (computing); Group (periodic table); Set (abstract data type); Operations research; Data mining; Artificial intelligence; Mathematics; Mechanical engineering","score_opus":0.020916472598088178,"score_gpt":0.2607539547849158,"score_spread":0.23983748218682763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2039775390","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39223918,0.00023957714,0.6021778,0.00025118474,0.000026748321,0.000074764896,0.00009313946,0.000089145076,0.004808402],"genre_scores_gemma":[0.98930174,0.000049789534,0.009864357,0.000008292679,0.0000056996264,0.000022008779,0.000029294722,0.0000035559278,0.00071541476],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99869674,0.00043175323,0.000051540792,0.00018765962,0.00043458646,0.00019773495],"domain_scores_gemma":[0.99886936,0.00067877444,0.00013184859,0.000056916237,0.00020420623,0.00005894368],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024551512,0.00051441696,0.00066554215,0.0009299217,0.0006085441,0.0010659004,0.00091995765,0.0006836633,0.0021682521],"category_scores_gemma":[0.003513072,0.000320642,0.00064892345,0.0010267303,0.00084851077,0.0013790979,0.0005422956,0.0005412744,0.00012123804],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016936296,0.000032961198,0.0014353546,0.00006646683,0.000037656155,0.000111928195,0.00028295064,0.9604217,0.0009657647,0.019241259,0.0002777556,0.016956845],"study_design_scores_gemma":[0.0000076148945,0.000017058679,0.0004025839,0.0000037684672,0.0000068260783,0.000008609826,0.00004784188,0.99154437,0.00025003415,0.007598439,0.00010681989,0.000005995142],"about_ca_topic_score_codex":0.0060065812,"about_ca_topic_score_gemma":0.0037608,"teacher_disagreement_score":0.0060065812,"about_ca_system_score_codex":0.0018676565,"about_ca_system_score_gemma":0.0007274685,"threshold_uncertainty_score":0.013550818},"labels":[],"label_agreement":null},{"id":"W2044010419","doi":"10.4028/www.scientific.net/amm.361-363.2092","title":"Operating Speed Based Criteria for Design Consistency Evaluation on Motorways in China","year":2013,"lang":"en","type":"article","venue":"Applied Mechanics and Materials","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Operating speed; Consistency (knowledge bases); Adaptability; Transport engineering; Design speed; China; Differential (mechanical device); Computer science; Evaluation methods; Engineering; Reliability engineering; Civil engineering; Artificial intelligence; Geography","score_opus":0.050060694141920214,"score_gpt":0.2779484002496982,"score_spread":0.22788770610777798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2044010419","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88779837,0.00044424084,0.1064335,0.000051324223,0.000014354801,0.00023270749,0.00019947019,0.00013794436,0.004688024],"genre_scores_gemma":[0.9830482,0.00009102995,0.016043482,0.000006431397,0.0000040840896,0.00010252855,0.00020258184,0.000017229475,0.0004843981],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99343175,0.0020028274,0.0008325519,0.0005021797,0.002893986,0.0003367892],"domain_scores_gemma":[0.99101865,0.0029529308,0.0015612305,0.0007027604,0.0035069843,0.00025748365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0066274838,0.0008920191,0.0005791881,0.004047343,0.00052102807,0.0010494201,0.00078618753,0.00054350623,0.0008332899],"category_scores_gemma":[0.011976977,0.00029486744,0.00071885955,0.0024101667,0.00068235205,0.000813226,0.0009074918,0.00024605167,0.000093404946],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008310162,0.00026048892,0.16139102,0.0006752961,0.00019389513,0.00030951723,0.000866815,0.56393254,0.020996608,0.0077407057,0.001254578,0.2415475],"study_design_scores_gemma":[0.00009007313,0.0020496973,0.19068421,0.00011974097,0.00021863959,0.00023435675,0.0010672509,0.771393,0.02448874,0.0050577023,0.0044484525,0.0001480935],"about_ca_topic_score_codex":0.0070825964,"about_ca_topic_score_gemma":0.006389768,"teacher_disagreement_score":0.0070825964,"about_ca_system_score_codex":0.0018019514,"about_ca_system_score_gemma":0.0015545017,"threshold_uncertainty_score":0.035049915},"labels":[],"label_agreement":null},{"id":"W2049894978","doi":"10.5267/j.dsl.2013.12.002","title":"Performance evaluation of services quality in higher education institutions using modified SERVQUAL approach with grey analytic hierarchy process (G-AHP) and multilevel grey evaluation","year":2014,"lang":"en","type":"article","venue":"Decision Science Letters","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Analytic hierarchy process; SERVQUAL; Quality (philosophy); Process (computing); Hierarchy; Computer science; Service quality; Management science; Process management; Operations research; Operations management; Business; Engineering; Marketing; Service (business); Economics","score_opus":0.1858836351245848,"score_gpt":0.3996066018077641,"score_spread":0.21372296668317928,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2049894978","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6633486,0.0006042821,0.31531826,0.0011387062,0.000061410814,0.00085734,0.00033778773,0.0002144047,0.018119179],"genre_scores_gemma":[0.9637068,0.00011655425,0.035501547,0.000024213687,0.000007037954,0.00009259085,0.0000814554,0.0000055773116,0.00046424064],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9960945,0.0019470922,0.00025897057,0.00017179546,0.0012597246,0.00026782005],"domain_scores_gemma":[0.99723405,0.0012121893,0.00040281133,0.00010824148,0.00087581045,0.00016703088],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0043213977,0.00037443527,0.00054110726,0.0026425652,0.00063870125,0.0016198022,0.00045150708,0.00044208026,0.0017445226],"category_scores_gemma":[0.0063142716,0.00012609562,0.0007449509,0.0027586087,0.0006043769,0.0011000402,0.0010829783,0.00050739833,0.00014709588],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00068349903,0.0010384107,0.13069496,0.001463379,0.00042032884,0.00043535925,0.0049502878,0.26846638,0.01192541,0.043993175,0.004215048,0.5317138],"study_design_scores_gemma":[0.000078253855,0.0013160544,0.07993207,0.0002480947,0.00017555342,0.00014022538,0.004181088,0.8846597,0.009218698,0.016345482,0.0035964502,0.00010826286],"about_ca_topic_score_codex":0.007451754,"about_ca_topic_score_gemma":0.007416267,"teacher_disagreement_score":0.007451754,"about_ca_system_score_codex":0.002428918,"about_ca_system_score_gemma":0.0022877816,"threshold_uncertainty_score":0.02285403},"labels":[],"label_agreement":null},{"id":"W2055530706","doi":"10.5539/mas.v2n2p108","title":"Research on Establishment of Accounting System for Safety Resources","year":2008,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Production (economics); Accounting information system; Process (computing); Business; Accounting; Management accounting; Risk analysis (engineering); Throughput accounting; Environmental economics; Computer science; Financial accounting; Economics","score_opus":0.079592170113402,"score_gpt":0.3186640066541077,"score_spread":0.2390718365407057,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2055530706","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11533075,0.012262441,0.7166542,0.008571363,0.0012605343,0.00036117117,0.00041457513,0.0003930123,0.14475189],"genre_scores_gemma":[0.89299935,0.006268963,0.0932553,0.00018329812,0.00050783466,0.00016804074,0.00028044518,0.000047720143,0.006289026],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99410135,0.0021975273,0.000520238,0.0007776139,0.0019820922,0.00042106723],"domain_scores_gemma":[0.9933696,0.0021352519,0.0011055737,0.0009300799,0.0022746846,0.00018477328],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006651864,0.0006362943,0.0005732204,0.0042438256,0.0018864133,0.0066387756,0.0013543546,0.0008602352,0.0029191375],"category_scores_gemma":[0.016341392,0.00032680726,0.0006909753,0.0048007546,0.0030942468,0.00920319,0.0016916575,0.0014972877,0.00043039297],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012220012,0.000014756591,0.00271714,0.00010324279,0.000015990061,0.000060363473,0.0004181682,0.004980438,0.00030612445,0.9543283,0.0014051145,0.035638038],"study_design_scores_gemma":[0.000030930318,0.00010844797,0.009680526,0.0005002471,0.00012514158,0.0003520819,0.0015158575,0.13602896,0.0030044694,0.7752913,0.073210046,0.000151896],"about_ca_topic_score_codex":0.008541011,"about_ca_topic_score_gemma":0.0030801087,"teacher_disagreement_score":0.008541011,"about_ca_system_score_codex":0.005682269,"about_ca_system_score_gemma":0.0059257103,"threshold_uncertainty_score":0.041227996},"labels":[],"label_agreement":null},{"id":"W2062871318","doi":"10.4028/www.scientific.net/amr.831.370","title":"Risk Assessment of Construction Organization Plans for Bridge Projects","year":2013,"lang":"en","type":"article","venue":"Advanced materials research","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Bridge (graph theory); Plan (archaeology); Risk management plan; Engineering; Analytic hierarchy process; Risk management; Construction engineering; Risk assessment; Risk analysis (engineering); Construction management; Construction site safety; Process (computing); IT risk management; Civil engineering; Computer science; Business; Operations research","score_opus":0.0626540878933016,"score_gpt":0.38595986225856743,"score_spread":0.32330577436526586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2062871318","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6635279,0.00045990493,0.32351297,0.0004423951,0.000022602928,0.00056337693,0.00047790472,0.00035562602,0.010637277],"genre_scores_gemma":[0.95743185,0.00020853936,0.04047973,0.000010605683,0.000005438344,0.00025713627,0.00047203037,0.000019880916,0.0011148048],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974304,0.0012095195,0.00012172522,0.00017698116,0.0009168795,0.00014448253],"domain_scores_gemma":[0.99756986,0.0010655741,0.0005583595,0.0001541969,0.0005218001,0.00013019872],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036490003,0.00074677303,0.00023759676,0.002680955,0.00045646317,0.0013487116,0.00046181006,0.0004978148,0.001793413],"category_scores_gemma":[0.007503028,0.00038848232,0.0007242351,0.0008205453,0.0003520098,0.0012708682,0.0010514666,0.00046316814,0.0001350144],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032339402,0.0002183702,0.06808969,0.00018411707,0.00015817364,0.00036052943,0.001287161,0.76711184,0.0023933272,0.03816412,0.0021556756,0.11955368],"study_design_scores_gemma":[0.000033495417,0.00039826307,0.025375979,0.000082639956,0.00008345643,0.00016485856,0.0013709291,0.94574857,0.0020850166,0.021552237,0.0030479925,0.000056564197],"about_ca_topic_score_codex":0.0033377572,"about_ca_topic_score_gemma":0.0033311348,"teacher_disagreement_score":0.0036490003,"about_ca_system_score_codex":0.00138646,"about_ca_system_score_gemma":0.0015218098,"threshold_uncertainty_score":0.019297957},"labels":[],"label_agreement":null},{"id":"W2066486477","doi":"10.2333/bhmk.33.179","title":"Generalized Constrained Redundancy Analysis","year":2006,"lang":"es","type":"article","venue":"Behaviormetrika","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Redundancy (engineering); Mathematics; Variety (cybernetics); Mathematical optimization; Partial function; Applied mathematics; Algorithm; Computer science; Statistics; Discrete mathematics","score_opus":0.023808465888296146,"score_gpt":0.28901777142999835,"score_spread":0.2652093055417022,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2066486477","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009444246,0.00044106334,0.9739924,0.00016519066,0.000046403307,0.000040819377,0.00021379911,0.00023631485,0.015419881],"genre_scores_gemma":[0.6424476,0.0010462368,0.31371942,0.0002590103,0.0002019511,0.00035071975,0.0013653109,0.0006550208,0.0399548],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99897647,0.00036098136,0.000039157014,0.00020221835,0.00033705114,0.00008415963],"domain_scores_gemma":[0.99898154,0.00032227222,0.0001162263,0.00031230063,0.00023711476,0.000030513907],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094726164,0.0012974747,0.0011877499,0.0015593524,0.00045423277,0.0010494551,0.0014089824,0.00065932993,0.010361114],"category_scores_gemma":[0.0034566298,0.0004842053,0.0010588226,0.0012151478,0.0010417968,0.0017921807,0.0016033432,0.0009139473,0.0015926516],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006735731,0.00004818752,0.00039818487,0.00020381174,0.00011585156,0.00014022853,0.00007771862,0.2483023,0.0030732304,0.6284167,0.0069885557,0.11216788],"study_design_scores_gemma":[0.000006692031,0.000021854465,0.00031548334,0.00003067655,0.000029020492,0.000050074865,0.000015488877,0.66356784,0.00078808697,0.33177298,0.003388237,0.000013530578],"about_ca_topic_score_codex":0.0019893623,"about_ca_topic_score_gemma":0.0020814836,"teacher_disagreement_score":0.010361114,"about_ca_system_score_codex":0.0005977132,"about_ca_system_score_gemma":0.0007815046,"threshold_uncertainty_score":0.034661353},"labels":[],"label_agreement":null},{"id":"W2074734012","doi":"10.1109/icime.2010.5477934","title":"Comparative studies on the significance of difference between China state-owned and non-state-owned contractors within industry segmentation","year":2010,"lang":"en","type":"article","venue":"","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Wilcoxon signed-rank test; China; Ranking (information retrieval); Industrial organization; State owned; State (computer science); Significant difference; Construction industry; Business; Rank (graph theory); Operations management; Computer science; Engineering; Economics; Statistics; Mathematics; Market economy; Artificial intelligence; Political science; Construction engineering","score_opus":0.05837861536410924,"score_gpt":0.3152720066127989,"score_spread":0.2568933912486897,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2074734012","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99681324,0.00031182973,0.00022107208,0.00009938429,0.0000039262814,0.0000039832307,0.00008408164,0.0000025692493,0.0024598422],"genre_scores_gemma":[0.99959725,0.000059351496,0.00003865849,0.000004754896,0.0000025478785,0.0000010903665,0.00008832433,6.264614e-7,0.00020740675],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.998662,0.00045953426,0.000079734236,0.0001801401,0.00025361075,0.00036495857],"domain_scores_gemma":[0.99515295,0.0026100483,0.0009016194,0.0002051757,0.0005528117,0.0005773617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024721725,0.0001278151,0.00030509723,0.0014775349,0.00047192143,0.00096050743,0.0003213051,0.00021550863,0.0029801696],"category_scores_gemma":[0.0055359076,0.00007745393,0.0004445058,0.002691467,0.00067494524,0.00072827627,0.0004468807,0.00031858977,0.00008841439],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031477484,0.00010697873,0.96038735,0.00007354981,0.00019606997,0.00017511188,0.0014373217,0.005891917,0.0006376619,0.0055715493,0.00061819877,0.024589457],"study_design_scores_gemma":[0.000007382336,0.000111449604,0.99032754,0.000014293655,0.00005595851,0.000031816555,0.0029062517,0.0048802695,0.00030601927,0.00048169584,0.00086917897,0.00000806178],"about_ca_topic_score_codex":0.031208467,"about_ca_topic_score_gemma":0.04804547,"teacher_disagreement_score":0.031208467,"about_ca_system_score_codex":0.0016933017,"about_ca_system_score_gemma":0.0014860443,"threshold_uncertainty_score":0.06205362},"labels":[],"label_agreement":null},{"id":"W2081025098","doi":"10.5539/ass.v5n8p144","title":"Study on Construction Cost of Construction Projects","year":2009,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cost engineering; Construction management; Pre-construction services; Control (management); Status quo; Cost control; Quality (philosophy); Investment (military); Construction engineering; Risk analysis (engineering); Value engineering; Cost accounting; Cost estimate; Process (computing); Cost contingency; Quality costs; China; Project management; Engineering management; Business; Engineering; Operations management; Computer science; Project management triangle; Civil engineering; Systems engineering; Economics; Accounting","score_opus":0.03425770082043238,"score_gpt":0.31088652295911123,"score_spread":0.27662882213867884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2081025098","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9506498,0.0020915489,0.013035705,0.0007524132,0.000052326708,0.00006920379,0.00055791123,0.000014281798,0.032776836],"genre_scores_gemma":[0.9959329,0.0006485273,0.0010736089,0.000014378864,0.000016502736,0.000023753993,0.00024054464,0.0000069032667,0.0020428344],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9985203,0.00047500635,0.000078315716,0.00009169159,0.0006421683,0.0001924641],"domain_scores_gemma":[0.9943316,0.003869389,0.00053864095,0.00016904341,0.00089909846,0.00019228083],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014160649,0.0002468812,0.00030656878,0.0022204977,0.00042426516,0.0013241653,0.00053636153,0.00042837195,0.0021635755],"category_scores_gemma":[0.0089618005,0.00017463307,0.00046567802,0.0036628991,0.00048129587,0.0013998622,0.00042721644,0.0006027533,0.00010321407],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029095853,0.00035577881,0.42696214,0.0005625455,0.00024780462,0.0017418956,0.0025739816,0.20273021,0.0018019105,0.23696114,0.0062836166,0.11948805],"study_design_scores_gemma":[0.000024307026,0.00037273366,0.59279144,0.00028127633,0.00016584103,0.0011257048,0.005449635,0.33629102,0.001412598,0.032574818,0.029401464,0.00010906876],"about_ca_topic_score_codex":0.01358732,"about_ca_topic_score_gemma":0.012718373,"teacher_disagreement_score":0.01358732,"about_ca_system_score_codex":0.002492001,"about_ca_system_score_gemma":0.0012024392,"threshold_uncertainty_score":0.02701646},"labels":[],"label_agreement":null},{"id":"W2083200790","doi":"10.5539/ibr.v3n2p157","title":"Countermeasures of Improving Green Transportation of CZT Urban Agglomeration","year":2010,"lang":"en","type":"article","venue":"International Business Research","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Urban agglomeration; Business; Transport engineering; China; Economies of agglomeration; Environmental economics; Resource (disambiguation); Quality (philosophy); Computer science; Economic growth; Geography; Economics; Engineering; Economic geography","score_opus":0.052463321815917695,"score_gpt":0.33964633455367915,"score_spread":0.2871830127377615,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2083200790","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8575037,0.000636395,0.11934222,0.0016017059,0.00012718594,0.00033649037,0.00016010576,0.0006483554,0.01964387],"genre_scores_gemma":[0.9915838,0.00016003386,0.006514097,0.000043590855,0.000007126681,0.0000392071,0.000052458196,0.000009920296,0.0015897219],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996375,0.00009973633,0.000009820003,0.000045404162,0.000089576824,0.0001179387],"domain_scores_gemma":[0.9997476,0.000035891742,0.00004821253,0.00002492677,0.00010765526,0.000035773162],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041501777,0.00056066853,0.00029349118,0.0006775409,0.0007845381,0.0007613559,0.0007465136,0.000503715,0.001447018],"category_scores_gemma":[0.00079417013,0.00011944733,0.00032523763,0.0006575039,0.0004127633,0.0005580904,0.00090966077,0.00036891797,0.0001830017],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000737383,0.00056377373,0.016889261,0.00045251375,0.00016602634,0.00053186726,0.00052439555,0.7360079,0.057195947,0.03459756,0.00673926,0.14559415],"study_design_scores_gemma":[0.00016799,0.00081468537,0.0144901825,0.000047807614,0.0001684347,0.00008838229,0.0017096034,0.9112388,0.04950465,0.009502245,0.012212935,0.000054453187],"about_ca_topic_score_codex":0.019366087,"about_ca_topic_score_gemma":0.023603888,"teacher_disagreement_score":0.019366087,"about_ca_system_score_codex":0.001278442,"about_ca_system_score_gemma":0.0023965677,"threshold_uncertainty_score":0.038506746},"labels":[],"label_agreement":null},{"id":"W2091542047","doi":"10.1061/40961(319)14","title":"Economic Contribution Rate Analysis of Chinese Transportation Infrastructure Construction: Based on the Input-Output Data Sheet in 2002","year":2008,"lang":"en","type":"article","venue":"","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Investment (military); Transportation infrastructure; Order (exchange); Productivity; China; Government (linguistics); Business; Macro; Product (mathematics); Critical infrastructure; Function (biology); Transport infrastructure; Macro level; Industrial organization; Economy; Transport engineering; Economics; Finance; Economic system; Engineering; Economic growth; Computer science","score_opus":0.01835986618522754,"score_gpt":0.24193780794859415,"score_spread":0.22357794176336662,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2091542047","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9847447,0.00017596237,0.0015292432,0.00010973012,0.0000120102995,0.000044233915,0.00779514,0.000051027007,0.005538018],"genre_scores_gemma":[0.98802686,0.00018860803,0.0006290455,0.0000072160456,0.0000076151236,0.00004051954,0.008964304,0.000008020884,0.0021277778],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99963903,0.000054308486,0.00003258617,0.000061023533,0.00015933771,0.000053812524],"domain_scores_gemma":[0.9992526,0.00015358422,0.00011828768,0.000050171922,0.00039529227,0.000030106527],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007843549,0.00047545554,0.00029664807,0.0026313649,0.00018401077,0.00066464714,0.0003354966,0.00011848378,0.0009968665],"category_scores_gemma":[0.0016822448,0.00013695445,0.00056452677,0.0034816386,0.00015809818,0.00043758794,0.0003164556,0.00027315074,0.00017079475],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002510457,0.000094200346,0.8278848,0.00028227284,0.0002002901,0.0005111773,0.0004317578,0.12151757,0.0021702072,0.0053034434,0.005046901,0.03630634],"study_design_scores_gemma":[0.000010343656,0.00006363496,0.89142954,0.000016390759,0.0001055991,0.000063168416,0.0003844181,0.09953419,0.0027689866,0.00053635373,0.0050624507,0.000024920617],"about_ca_topic_score_codex":0.08989682,"about_ca_topic_score_gemma":0.060588922,"teacher_disagreement_score":0.08989682,"about_ca_system_score_codex":0.0025370703,"about_ca_system_score_gemma":0.0017715194,"threshold_uncertainty_score":0.17874712},"labels":[],"label_agreement":null},{"id":"W2095116536","doi":"10.5539/ass.v6n11p116","title":"Research on Green Logistics System Based on Circular Economy","year":2010,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Circular economy; Green logistics; Business; China; Industrial organization; Government (linguistics); Economic system; Environmental economics; Economics; Ecology","score_opus":0.07453970204962611,"score_gpt":0.3513598119668735,"score_spread":0.27682010991724737,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2095116536","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4228041,0.0014930625,0.48074865,0.0034185748,0.00017651873,0.00015300437,0.00027168047,0.00018633412,0.09074813],"genre_scores_gemma":[0.98675704,0.00065741234,0.0060087573,0.000056537232,0.000025770909,0.000043473836,0.000060059552,0.00001002131,0.006381005],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996195,0.00013619034,0.000015032869,0.00006823739,0.00008589319,0.000075153526],"domain_scores_gemma":[0.9995983,0.00012883177,0.00006733229,0.000027798527,0.00013992256,0.00003778343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005972138,0.0002488232,0.00035823218,0.0006130738,0.0007001757,0.0015195357,0.00047494256,0.0005467815,0.004711826],"category_scores_gemma":[0.0012366894,0.00016938588,0.000565159,0.0006936071,0.00086768623,0.0024321158,0.000831653,0.00045675045,0.00021323391],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007267265,0.000053671272,0.0037985223,0.00014152477,0.00005372689,0.00030529074,0.0002739149,0.35662377,0.001977043,0.61792356,0.0022614452,0.016514866],"study_design_scores_gemma":[0.00001751161,0.00005590109,0.0012191072,0.000023922454,0.000024414301,0.000057274465,0.00022688812,0.8432777,0.00075985683,0.14953423,0.0047840923,0.000019067626],"about_ca_topic_score_codex":0.0077608735,"about_ca_topic_score_gemma":0.0031706474,"teacher_disagreement_score":0.0077608735,"about_ca_system_score_codex":0.0020853092,"about_ca_system_score_gemma":0.0016151314,"threshold_uncertainty_score":0.015762687},"labels":[],"label_agreement":null},{"id":"W2097962339","doi":"10.3968/j.css.1923669720070301.004","title":"The Game Analyses of the Effect of Bank Claim, Penalty and Compensation to High Educational Aid-Loan","year":2010,"lang":"en","type":"article","venue":"Canadian social science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Loan; Welfare economics; Actuarial science; Sociology; Political science; Humanities; Economics; Finance; Philosophy","score_opus":0.01640821396133567,"score_gpt":0.30248912380295456,"score_spread":0.2860809098416189,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097962339","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7307686,0.0004667692,0.19019,0.0019906494,0.00014574677,0.0006892707,0.0003999463,0.00011508229,0.07523388],"genre_scores_gemma":[0.9875908,0.00013966032,0.005209309,0.00007499162,0.000008614702,0.00012618954,0.00003102312,0.0000054882807,0.0068139364],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984548,0.0008919376,0.000059349506,0.00013379313,0.00019763727,0.00026251466],"domain_scores_gemma":[0.9941936,0.004785566,0.00036103578,0.000113596005,0.00031329918,0.00023300189],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016216626,0.00052778923,0.0005739549,0.00063552824,0.00053746946,0.0013522729,0.0007000894,0.00075784157,0.010105672],"category_scores_gemma":[0.0057274927,0.00021797235,0.0010351426,0.0002924103,0.0008517206,0.0013206085,0.0007113269,0.0013503818,0.00027590076],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012708738,0.0013261299,0.023764523,0.0006538898,0.00043405328,0.00107468,0.0023513546,0.36102772,0.011447294,0.55240536,0.0038693945,0.04037471],"study_design_scores_gemma":[0.00013360544,0.0009596557,0.016287325,0.00005690092,0.00021531788,0.00018806454,0.0015795423,0.8785339,0.0039878394,0.093386464,0.0045978744,0.00007353645],"about_ca_topic_score_codex":0.009700659,"about_ca_topic_score_gemma":0.0076860217,"teacher_disagreement_score":0.010105672,"about_ca_system_score_codex":0.002558739,"about_ca_system_score_gemma":0.0023868266,"threshold_uncertainty_score":0.03380686},"labels":[],"label_agreement":null},{"id":"W2099799007","doi":"10.5539/ass.v6n8p144","title":"Probe into the Auditing Solutions for Major Misstatement Risk","year":2010,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Mistake; Audit; Business; Audit risk; Accounting; Risk analysis (engineering); Actuarial science; Political science","score_opus":0.022334072077297797,"score_gpt":0.299375276279764,"score_spread":0.2770412042024662,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099799007","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.081327565,0.008508751,0.8401903,0.037133478,0.00041262945,0.00023511234,0.00009465493,0.00021704125,0.03188046],"genre_scores_gemma":[0.81998104,0.0053168577,0.16655153,0.0007235219,0.00020700804,0.00011715847,0.000049336493,0.00004482942,0.0070086136],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9949951,0.0027674607,0.00022368008,0.00042573913,0.001316649,0.00027131708],"domain_scores_gemma":[0.98978746,0.004983872,0.0014416677,0.0008885076,0.0025720906,0.0003263871],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00581999,0.00050782843,0.0005082592,0.0011750511,0.00096453476,0.0028141406,0.00088962424,0.0012733357,0.002378996],"category_scores_gemma":[0.022971557,0.00037299257,0.00066440867,0.0008869941,0.0015343853,0.0050086114,0.001747716,0.002892007,0.0003068311],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001223614,0.00020722236,0.0077154194,0.00052838225,0.00011041809,0.00017676204,0.0008922197,0.07072838,0.0018418168,0.6552509,0.009302056,0.253124],"study_design_scores_gemma":[0.000024166202,0.00020320785,0.0030551301,0.00032386516,0.000051943698,0.0002807889,0.0013225328,0.2568141,0.0022166215,0.7177049,0.017933792,0.000069008485],"about_ca_topic_score_codex":0.0020499688,"about_ca_topic_score_gemma":0.002140244,"teacher_disagreement_score":0.00581999,"about_ca_system_score_codex":0.001546798,"about_ca_system_score_gemma":0.0031627796,"threshold_uncertainty_score":0.030779421},"labels":[],"label_agreement":null},{"id":"W2107633941","doi":"10.1061/9780784479292.214","title":"Reliability of Signalized Intersections: A Stochastic Concept of Capacity","year":2015,"lang":"en","type":"article","venue":"","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ministry of Education and Child Care","funders":"","keywords":"Headway; Highway Capacity Manual; Intersection (aeronautics); Reliability (semiconductor); Computer science; Mathematics; Statistics; Transport engineering; Engineering; Simulation; Level of service; Physics","score_opus":0.05654875979072504,"score_gpt":0.2723315653218115,"score_spread":0.21578280553108647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107633941","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36670738,0.0012501822,0.62532973,0.0006748326,0.000061795,0.00006269257,0.0005874627,0.00021103084,0.005114814],"genre_scores_gemma":[0.99210757,0.00025787327,0.0068390514,0.000017073251,0.000055954246,0.000040172246,0.00016467241,0.000019595012,0.0004979866],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9956333,0.0012886735,0.00028238364,0.0010564311,0.0012648739,0.00047440012],"domain_scores_gemma":[0.9806676,0.011223488,0.0032693138,0.0016221161,0.0027093797,0.00050802366],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036202148,0.00073620334,0.00083693647,0.0034265968,0.0005781146,0.0018232532,0.0020813935,0.00094868045,0.0016014605],"category_scores_gemma":[0.020085542,0.000543744,0.0010606874,0.002295674,0.0030072394,0.005398762,0.0016198548,0.0012248158,0.000154792],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009763847,0.00003333988,0.023200043,0.0001574978,0.00016633226,0.0004070187,0.00075510173,0.788186,0.0030403114,0.16719806,0.00079167867,0.015966885],"study_design_scores_gemma":[0.000008294232,0.00008258561,0.008915397,0.000032695076,0.000045133183,0.00025639407,0.00026054424,0.91845983,0.0010715233,0.06946199,0.001332868,0.00007277444],"about_ca_topic_score_codex":0.0044132024,"about_ca_topic_score_gemma":0.0015336623,"teacher_disagreement_score":0.0044132024,"about_ca_system_score_codex":0.002445325,"about_ca_system_score_gemma":0.000874039,"threshold_uncertainty_score":0.019145787},"labels":[],"label_agreement":null},{"id":"W2112298815","doi":"10.3968/j.css.1923669720080402.006","title":"Empirical Study of Integrated EVA Performance Measurement in China","year":2009,"lang":"en","type":"article","venue":"Canadian social science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Economic Value Added; Humanities; Profit (economics); Political science; Economics; Philosophy; Microeconomics","score_opus":0.05255982021448397,"score_gpt":0.30023576811200436,"score_spread":0.2476759478975204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2112298815","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9978962,0.000086769505,0.00060429913,0.00008402013,0.0000021276917,0.000017230022,0.00016660054,0.000012208131,0.0011305762],"genre_scores_gemma":[0.99904555,0.00006280005,0.00024899826,0.000008378708,0.0000030647675,0.000014551883,0.00022130214,0.0000017367618,0.00039362078],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9977373,0.00039342957,0.0002449031,0.00034211756,0.00095749105,0.00032485655],"domain_scores_gemma":[0.99425465,0.0017068773,0.0016105524,0.00041428139,0.0015932014,0.00042045757],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00352446,0.0004493146,0.0005212978,0.0022510686,0.0006328368,0.001139331,0.0008961184,0.0004851736,0.0017065664],"category_scores_gemma":[0.006182651,0.00031150965,0.0006505768,0.004985086,0.0005708141,0.0014750143,0.0011973641,0.0006421911,0.00021784601],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041906285,0.00016889731,0.9682998,0.00006403402,0.00012648811,0.00030309605,0.00085779274,0.0076343375,0.00043507916,0.0008759541,0.00051370444,0.02067901],"study_design_scores_gemma":[0.00000764193,0.0001084938,0.9597438,0.000026297952,0.000040113435,0.00005952021,0.0008765491,0.037741743,0.00042722138,0.00019906805,0.0007523604,0.000017159535],"about_ca_topic_score_codex":0.066175155,"about_ca_topic_score_gemma":0.042084914,"teacher_disagreement_score":0.066175155,"about_ca_system_score_codex":0.0033160641,"about_ca_system_score_gemma":0.0029079155,"threshold_uncertainty_score":0.13157994},"labels":[],"label_agreement":null},{"id":"W2152965554","doi":"10.5539/jpl.v4n2p61","title":"Primary Study on the Combination Mode of Design and Supervision in the Construction Project Consulting Service in China","year":2011,"lang":"en","type":"article","venue":"Journal of Politics and Law","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Service (business); Service design; Engineering management; China; Business; Process management; Mode (computer interface); Engineering; Service delivery framework; Computer science; Marketing; Political science","score_opus":0.053797622828972116,"score_gpt":0.282007408871037,"score_spread":0.22820978604206488,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152965554","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9927418,0.00011568698,0.000317934,0.00027627853,0.000004600764,0.000044910194,0.00004342521,0.0000030882002,0.006452274],"genre_scores_gemma":[0.99776256,0.00009006118,0.00012961775,0.00003386457,0.0000035179896,0.000013215676,0.000031646814,0.0000013479229,0.0019341225],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9975236,0.00063774956,0.000090979156,0.00024703165,0.0006578251,0.00084281183],"domain_scores_gemma":[0.99720794,0.00068508036,0.0005923423,0.00011647803,0.00071587344,0.000682307],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019520397,0.00022233621,0.00044943579,0.0013685016,0.0020504664,0.0015427705,0.00067462656,0.00046823523,0.0073081073],"category_scores_gemma":[0.0034039773,0.00028089358,0.0003911546,0.0022000314,0.0009712842,0.0012802009,0.0011020494,0.0006906231,0.0003568893],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043579546,0.0009477741,0.8952298,0.0002473487,0.00009364548,0.0013658858,0.016779955,0.0023552321,0.001821849,0.018928839,0.0034168467,0.058377],"study_design_scores_gemma":[0.0000713289,0.0004738752,0.92875665,0.000121782265,0.000111200425,0.0003190003,0.041583,0.013642934,0.00083119876,0.0023123904,0.011728658,0.00004801985],"about_ca_topic_score_codex":0.119716145,"about_ca_topic_score_gemma":0.16897541,"teacher_disagreement_score":0.119716145,"about_ca_system_score_codex":0.007892732,"about_ca_system_score_gemma":0.009534358,"threshold_uncertainty_score":0.2380386},"labels":[],"label_agreement":null},{"id":"W2155074197","doi":"10.5430/afr.v1n1p230","title":"Primary Investigation in the Completeness Evaluation Model of Accounting System in Agricultural Enterprises","year":2012,"lang":"en","type":"article","venue":"Accounting and Finance Research","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Accounting information system; Completeness (order theory); Accounting; Agriculture; Management accounting; Business; Project accounting; Cost accounting; Order (exchange); Fund accounting; Financial accounting; Finance; Mathematics","score_opus":0.11835095282478574,"score_gpt":0.3317235579506484,"score_spread":0.21337260512586265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2155074197","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2551833,0.0017911833,0.70988226,0.0019708392,0.00006283931,0.00026000655,0.00037567198,0.00029242047,0.030181495],"genre_scores_gemma":[0.96961915,0.0006266253,0.026751824,0.000047540227,0.00004440154,0.00009558827,0.00025353202,0.000030811883,0.0025305762],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9934849,0.0025086168,0.0003569636,0.0007477531,0.0025540167,0.0003477604],"domain_scores_gemma":[0.9893127,0.0038486596,0.0014891456,0.0010851473,0.0040073865,0.00025690318],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0069730515,0.000634367,0.0007776105,0.0024754438,0.00079181214,0.0032052214,0.0010150892,0.00080433534,0.0018612365],"category_scores_gemma":[0.018689593,0.00036212493,0.00096415024,0.002107628,0.0014846397,0.0063764276,0.00126926,0.001138462,0.00018350162],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018383807,0.00018978049,0.054172777,0.00050220446,0.00026784453,0.0001956655,0.0013296647,0.39700502,0.0030991216,0.42569998,0.00348064,0.113873444],"study_design_scores_gemma":[0.000016586771,0.00017246831,0.020934436,0.00011187421,0.00009170273,0.00016483098,0.00044276423,0.8575723,0.00231164,0.11353121,0.004584146,0.00006604771],"about_ca_topic_score_codex":0.0074480064,"about_ca_topic_score_gemma":0.005052677,"teacher_disagreement_score":0.0074480064,"about_ca_system_score_codex":0.0032013555,"about_ca_system_score_gemma":0.0034546414,"threshold_uncertainty_score":0.036877513},"labels":[],"label_agreement":null},{"id":"W216867159","doi":"","title":"Empirical Study of Integrated EVA Performance Measurement in China1/ÉTUDE EMPIRIQUE SUR EVA INTÉGRÉE DE MESURE DU RENDEMENT EN CHINE","year":2008,"lang":"fr","type":"article","venue":"Canadian social science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Economic Value Added; Humanities; Welfare economics; Profit (economics); Economics; Philosophy; Microeconomics","score_opus":0.05229815502043103,"score_gpt":0.2993032339171487,"score_spread":0.24700507889671766,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W216867159","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99734735,0.0001020074,0.0011760261,0.00007088523,0.0000030598671,0.000020697118,0.00011035111,0.000011268292,0.0011582517],"genre_scores_gemma":[0.99904984,0.000055701552,0.00035651817,0.000006008996,0.000002929989,0.000016010654,0.00015014943,0.0000022223576,0.00036062216],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9967859,0.00074586197,0.00029154596,0.00050542207,0.0013011482,0.00037011673],"domain_scores_gemma":[0.9917596,0.0035486934,0.0016916577,0.000553883,0.0019983076,0.0004478693],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005141164,0.00063336146,0.0007073605,0.0023400176,0.00080904673,0.0016982672,0.0011794519,0.0006409837,0.0015976325],"category_scores_gemma":[0.0070316307,0.00044949877,0.0010556536,0.003804328,0.0007100645,0.0016767668,0.0012774647,0.0009348646,0.00019409855],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000071790346,0.0002480311,0.95613134,0.00009423344,0.00025142863,0.0003604542,0.000956111,0.019872481,0.0006280243,0.0014770407,0.00044158087,0.01946749],"study_design_scores_gemma":[0.000016395488,0.00021439912,0.8576895,0.00006098202,0.000101742844,0.0000629866,0.0012202122,0.13809949,0.001117458,0.00043682146,0.0009438695,0.00003620964],"about_ca_topic_score_codex":0.07254488,"about_ca_topic_score_gemma":0.05009407,"teacher_disagreement_score":0.07254488,"about_ca_system_score_codex":0.0035349962,"about_ca_system_score_gemma":0.0031859798,"threshold_uncertainty_score":0.1442452},"labels":[],"label_agreement":null},{"id":"W2188396912","doi":"10.1007/978-3-642-23993-9_69","title":"Investment Value Analysis for Listed Companies of China Communications Industry","year":2011,"lang":"en","type":"book-chapter","venue":"Communications in computer and information science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Corporation; Business; Investment (military); Value (mathematics); Listed company; Principal component analysis; Quarter (Canadian coin); Index (typography); Accounting; Finance; Computer science; Statistics; Geography; Mathematics; Political science","score_opus":0.10329819480633136,"score_gpt":0.3150920750254798,"score_spread":0.21179388021914847,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2188396912","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97757864,0.002191786,0.005458501,0.0003908785,0.000014889091,0.00002215914,0.0014597256,0.00004095346,0.012842578],"genre_scores_gemma":[0.9941115,0.00044106584,0.00089461915,0.000011098424,0.000008527588,0.000009780911,0.0009943198,0.000005359369,0.003523807],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997739,0.00004843141,0.000011042717,0.000031335192,0.000076183125,0.000059046986],"domain_scores_gemma":[0.99929166,0.00036125057,0.000094904884,0.000029313205,0.00017261863,0.00005018106],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061954896,0.0002966577,0.00021927578,0.002190338,0.00031365204,0.0010200824,0.0004996543,0.0004094564,0.0019263806],"category_scores_gemma":[0.0013209576,0.00017975767,0.0004861817,0.0022181282,0.00024541674,0.0012671623,0.00025722166,0.0004020272,0.00013086823],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00057063735,0.00027141135,0.4508282,0.00035275944,0.00023922427,0.0013986623,0.001010678,0.2630731,0.0026203245,0.122557506,0.020936115,0.13614143],"study_design_scores_gemma":[0.000016975444,0.0001795537,0.29670128,0.00008834812,0.0001536201,0.0003445076,0.0015174738,0.6634182,0.0017538674,0.027686927,0.008082098,0.000057206955],"about_ca_topic_score_codex":0.029908633,"about_ca_topic_score_gemma":0.03245834,"teacher_disagreement_score":0.029908633,"about_ca_system_score_codex":0.003141986,"about_ca_system_score_gemma":0.0007464446,"threshold_uncertainty_score":0.059469104},"labels":[],"label_agreement":null},{"id":"W2190261748","doi":"10.1061/9780784479384.146","title":"Multiple Attribute Group Decision Making by Analytical Hierarchy Process in Pavement Preventive Maintenance","year":2015,"lang":"en","type":"article","venue":"","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Preventive maintenance; Analytic hierarchy process; Connotation; Measure (data warehouse); Computer science; Process (computing); Group decision-making; Risk analysis (engineering); Operations research; Engineering; Transport engineering; Reliability engineering; Data mining; Business","score_opus":0.03514561669243646,"score_gpt":0.30863990281156667,"score_spread":0.2734942861191302,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2190261748","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035471577,0.00063240406,0.9597649,0.0005382845,0.00006365097,0.00019047305,0.000042469488,0.00006722319,0.0032291252],"genre_scores_gemma":[0.7164429,0.0008186213,0.2802416,0.000092707334,0.000118379234,0.00039441462,0.000076708646,0.00002653122,0.0017882771],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9878705,0.0076582287,0.00046148818,0.00092700287,0.0023033042,0.0007794356],"domain_scores_gemma":[0.99507153,0.0036576411,0.00036789582,0.00012488695,0.0005274148,0.00025071498],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011044517,0.0011906589,0.0022515012,0.0019971232,0.002080144,0.0032684621,0.0019087564,0.0017139856,0.0021869433],"category_scores_gemma":[0.010406477,0.0008196232,0.0019402584,0.0031831795,0.0022468667,0.003466112,0.0023423433,0.0023168053,0.00019169632],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015284965,0.00021566484,0.0013065629,0.00036399742,0.0002415055,0.0002496003,0.001500441,0.82955813,0.00088753545,0.11495002,0.00096998335,0.049603727],"study_design_scores_gemma":[0.00004181539,0.00012432515,0.00022605552,0.000033017302,0.000055130084,0.000022103144,0.00021091219,0.9245409,0.00027501996,0.07361954,0.00082032033,0.000030807372],"about_ca_topic_score_codex":0.008743975,"about_ca_topic_score_gemma":0.0068799714,"teacher_disagreement_score":0.011044517,"about_ca_system_score_codex":0.003721988,"about_ca_system_score_gemma":0.0033214379,"threshold_uncertainty_score":0.05840969},"labels":[],"label_agreement":null},{"id":"W226288266","doi":"","title":"A Test on the Systematic Fuzzy Measurement of the Key Degree for the Core Employees' Performance Traits/TEST DE LA MESURE SYSTEMATIQUE ET FLOUE DU DEGRE CLE POUR LES TRAITS DE LA PERFORMANCE DES EMPLOYES IMPORTANTS","year":2006,"lang":"fr","type":"article","venue":"Canadian social science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Psychology; Humanities; Degree (music); Test (biology); Social psychology; Philosophy","score_opus":0.05834634821226606,"score_gpt":0.27052820652312687,"score_spread":0.2121818583108608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W226288266","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.983264,0.000045770954,0.011607306,0.00010442182,0.000035284756,0.00015447181,0.0002017307,0.000030131501,0.0045569013],"genre_scores_gemma":[0.99441224,0.000011438295,0.004919942,0.00001560025,0.000004929017,0.0001701593,0.000092982526,0.0000030752947,0.00036966082],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99638236,0.0013655156,0.00036535077,0.0003762752,0.0012977694,0.00021265804],"domain_scores_gemma":[0.9706652,0.021807805,0.0024600627,0.0013683924,0.0029676852,0.0007309052],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004161906,0.0003751597,0.00027161674,0.001061502,0.00044915892,0.0005755816,0.00041017777,0.0007436504,0.003491458],"category_scores_gemma":[0.022837311,0.00011663294,0.00075905153,0.0007832737,0.0009248882,0.000872476,0.00080490275,0.00066470285,0.00038004806],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0025465426,0.0012532966,0.8056661,0.00039168622,0.00034205927,0.00022118162,0.005159735,0.005382536,0.025323015,0.011344491,0.0018313121,0.14053802],"study_design_scores_gemma":[0.00016367457,0.0031511588,0.9383011,0.00010424526,0.00007018935,0.00025916807,0.0030164311,0.032564845,0.014756678,0.0052434835,0.0023086593,0.000060228245],"about_ca_topic_score_codex":0.00087622256,"about_ca_topic_score_gemma":0.00061633595,"teacher_disagreement_score":0.004161906,"about_ca_system_score_codex":0.00043664314,"about_ca_system_score_gemma":0.00076259323,"threshold_uncertainty_score":0.022010565},"labels":[],"label_agreement":null},{"id":"W2324710670","doi":"10.3724/sp.j.1001.2011.04020","title":"Cycle Symmetry Reduction and Its Extension on Three-Valued Models","year":2011,"lang":"en","type":"article","venue":"Journal of Software","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Symmetry (geometry); Reduction (mathematics); Mathematics; Quotient; Permutation (music); Extension (predicate logic); Permutation group; Pure mathematics; Symmetry operation; Combinatorics; Computer science; Physics; Geometry","score_opus":0.06030066304187863,"score_gpt":0.2527932136569738,"score_spread":0.19249255061509518,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2324710670","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15433787,0.0010949279,0.5413504,0.007220025,0.00041159085,0.00016996625,0.00035539293,0.00030237032,0.29475737],"genre_scores_gemma":[0.9231906,0.00064546015,0.048644986,0.0006143135,0.00022683958,0.00020310354,0.00022628772,0.0001331376,0.026115356],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992908,0.0002497375,0.00003689626,0.00009945104,0.00021035402,0.0001126627],"domain_scores_gemma":[0.9989901,0.00042734115,0.00012938547,0.00015762504,0.00020150613,0.00009408398],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012429979,0.00042630435,0.00053745334,0.0013304879,0.00126167,0.0016343046,0.00088963023,0.0010150322,0.0084287925],"category_scores_gemma":[0.00320976,0.00027930358,0.0017055057,0.0009165936,0.0032149865,0.004421267,0.0018537298,0.0024190603,0.0007149868],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004096118,0.000006729082,0.000047233993,0.000007493665,0.0000028608006,0.000022896349,0.000081647115,0.0010459501,0.00008272891,0.9965072,0.00033963216,0.0018513574],"study_design_scores_gemma":[0.000005147331,0.000004504356,0.000034508463,0.0000039224915,0.0000015879613,0.000014819344,0.000030275953,0.005879348,0.000058297792,0.9928241,0.0011402752,0.0000032398677],"about_ca_topic_score_codex":0.0041184262,"about_ca_topic_score_gemma":0.0020834098,"teacher_disagreement_score":0.0084287925,"about_ca_system_score_codex":0.0018678796,"about_ca_system_score_gemma":0.001310738,"threshold_uncertainty_score":0.02819711},"labels":[],"label_agreement":null},{"id":"W233088121","doi":"","title":"The Game Analyses of the Effect of Bank Claim, Penalty and Compensation to High Educational Aid-Loan/ANALYSES DE JEU SUR LES EFFETS DE LA RECLAMATION, LA PENALITE ET LA COMPENSATION DE LA BANQUE AU PRET D'ETUDES SUPERIEUR","year":2007,"lang":"fr","type":"article","venue":"Canadian social science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Loan; Compensation (psychology); Government (linguistics); Lagging; Non-performing loan; Participation loan; Actuarial science; Student loan; Business; Economics; Finance; Psychology","score_opus":0.03024014018687389,"score_gpt":0.3642910317130301,"score_spread":0.33405089152615625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W233088121","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88763916,0.0007777079,0.07684953,0.00206072,0.00012755199,0.0004360034,0.00041838008,0.00008065006,0.031610355],"genre_scores_gemma":[0.9924056,0.00020524891,0.0023852882,0.00009798748,0.000010640962,0.000096712814,0.000033575892,0.000004906065,0.004760047],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99837154,0.0009404415,0.000059423393,0.00012994942,0.00017535202,0.00032337455],"domain_scores_gemma":[0.98769426,0.010572242,0.0006488674,0.00018306807,0.00048445127,0.00041697125],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023334601,0.00068566937,0.0010991965,0.0006050919,0.00054509245,0.001305626,0.00078753126,0.00092120195,0.008237348],"category_scores_gemma":[0.009053155,0.0002900903,0.0011328548,0.00028551414,0.0009879223,0.001312407,0.0006811117,0.0015964631,0.00022737483],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003381505,0.0021944002,0.021655576,0.00087870983,0.00086541293,0.001056157,0.001338188,0.66018456,0.012052235,0.2506791,0.0048999535,0.04081421],"study_design_scores_gemma":[0.00024629175,0.0015877773,0.017402675,0.000047317022,0.00039314132,0.00015577931,0.0007572334,0.9232368,0.0028458445,0.051395625,0.0018476835,0.000083851555],"about_ca_topic_score_codex":0.011880048,"about_ca_topic_score_gemma":0.00907903,"teacher_disagreement_score":0.011880048,"about_ca_system_score_codex":0.0024916432,"about_ca_system_score_gemma":0.0021181966,"threshold_uncertainty_score":0.027556717},"labels":[],"label_agreement":null},{"id":"W2334749100","doi":"10.1061/41064(358)461","title":"Risk Evaluation Model for Construction of a Logistics Park Based on Principal Component Analysis","year":2009,"lang":"en","type":"article","venue":"","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"York University","keywords":"Component (thermodynamics); Risk analysis (engineering); Principal component analysis; Function (biology); Investment (military); Computer science; Risk model; Principal (computer security); Operations research; Business; Engineering; Computer security; Artificial intelligence","score_opus":0.05295110559007667,"score_gpt":0.30614087855884525,"score_spread":0.2531897729687686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2334749100","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038079854,0.00013443154,0.9559946,0.00022393708,0.000020564747,0.0000699023,0.00008318697,0.00032250478,0.005070943],"genre_scores_gemma":[0.91972214,0.00029929006,0.071368136,0.000035094872,0.000025790734,0.0002727019,0.0001700407,0.00008587545,0.008020967],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989448,0.00038980233,0.000045845674,0.0001568823,0.00033317722,0.0001294339],"domain_scores_gemma":[0.9991128,0.00038065974,0.00011666359,0.000033917968,0.000304362,0.000051567964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016020553,0.0010910913,0.00086719444,0.0011021391,0.00061511534,0.001576299,0.0012404806,0.00093366596,0.003159555],"category_scores_gemma":[0.0021272495,0.0004102507,0.000986314,0.0006689685,0.00064222503,0.0013600438,0.00087207335,0.00089394214,0.0003915271],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025393809,0.000011207176,0.00045333258,0.000016316782,0.000013023545,0.000040975072,0.000029864317,0.9880029,0.00044510418,0.0054279063,0.00028183102,0.005252014],"study_design_scores_gemma":[0.0000017797165,0.000011363685,0.00011588206,0.0000016901487,0.0000061195356,0.000010999859,0.000005770716,0.998387,0.00012942469,0.0012186479,0.000106840605,0.0000044877625],"about_ca_topic_score_codex":0.011802821,"about_ca_topic_score_gemma":0.0068637785,"teacher_disagreement_score":0.011802821,"about_ca_system_score_codex":0.0016864962,"about_ca_system_score_gemma":0.0015438014,"threshold_uncertainty_score":0.023468256},"labels":[],"label_agreement":null},{"id":"W2347484639","doi":"","title":"Unified power quality controller using new control strategy","year":2005,"lang":"en","type":"article","venue":"","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CAE (Canada)","funders":"","keywords":"Control theory (sociology); Controller (irrigation); Voltage; Active power filter; Voltage controller; Voltage source; Computer science; Power (physics); Active filter; Voltage optimisation; AC power; Voltage regulation; Amplitude; Engineering; Control (management); Electrical engineering; Physics; Voltage droop","score_opus":0.06658476362623275,"score_gpt":0.32279639342573146,"score_spread":0.25621162979949874,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2347484639","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0065386374,0.00057651947,0.9817297,0.000114655246,0.00030504251,0.000080441256,0.000021694908,0.0008566427,0.009776802],"genre_scores_gemma":[0.8259768,0.000863453,0.15783624,0.00035277125,0.00048463582,0.00036571154,0.00017002189,0.00007091833,0.013879476],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993648,0.000079610814,0.000043808734,0.000119519114,0.00034204664,0.000050216906],"domain_scores_gemma":[0.9997757,0.000028482676,0.000018772438,0.000026715641,0.00013651152,0.00001377327],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005166449,0.0007430348,0.00088617037,0.0005601357,0.00034478153,0.0014289226,0.0012935122,0.00059076195,0.0024115064],"category_scores_gemma":[0.00044684214,0.00019723672,0.00043709914,0.00053650595,0.00055143854,0.0009237288,0.00062971207,0.0008545821,0.00046059449],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025580078,0.00025307585,0.0006595305,0.00059805403,0.00021610195,0.0006101294,0.00034784724,0.22371331,0.054259744,0.1699244,0.011852737,0.5373092],"study_design_scores_gemma":[0.00019111724,0.000305507,0.000384526,0.00002410557,0.00008548825,0.0001992117,0.000020025887,0.9637441,0.007740375,0.009232794,0.018029924,0.000042893396],"about_ca_topic_score_codex":0.002540833,"about_ca_topic_score_gemma":0.0025603643,"teacher_disagreement_score":0.002540833,"about_ca_system_score_codex":0.0007229866,"about_ca_system_score_gemma":0.0005581407,"threshold_uncertainty_score":0.00806731},"labels":[],"label_agreement":null},{"id":"W2347596843","doi":"","title":"Information Asymmetry,the Characteristics of Directorate and the Selection of Management Forecast Disclosure——An Empirical Study Based on the Data From 2004-2007 of a Listed Company in China","year":2009,"lang":"en","type":"article","venue":"Caijing luncong","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Information asymmetry; Asymmetry; Accounting; Econometrics; China; Quarter (Canadian coin); Business; Degree (music); Statistics; Economics; Finance; Mathematics; Political science; Geography","score_opus":0.03559681046686927,"score_gpt":0.2870548043513907,"score_spread":0.2514579938845214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2347596843","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9986349,0.00016156965,0.00023358718,0.00007883835,0.0000028904415,0.000009211051,0.0005586503,0.0000035371024,0.00031677214],"genre_scores_gemma":[0.9979122,0.00012454514,0.00012551082,0.000015148527,0.0000126049335,0.00000803803,0.001521534,0.0000013000202,0.00027904037],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99869007,0.00024822366,0.00018566109,0.00020229073,0.0004388226,0.0002350327],"domain_scores_gemma":[0.98521024,0.004576512,0.007301239,0.00086740335,0.0013650758,0.0006795084],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027476249,0.00032081752,0.0006269597,0.0021978857,0.0005276358,0.0011571131,0.00058527605,0.0005542572,0.0011200081],"category_scores_gemma":[0.0072013247,0.00030057508,0.00070359715,0.00267947,0.00046324538,0.001032237,0.00067095866,0.0005599529,0.00018541748],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007170431,0.000033583743,0.9944313,0.000019262196,0.00009100028,0.000120742756,0.0001241507,0.0019763953,0.00018913524,0.00013863108,0.00021571123,0.0025882917],"study_design_scores_gemma":[0.000015786287,0.000052504958,0.9840299,0.000011155937,0.00008135377,0.00009469414,0.00032534558,0.01410367,0.00044967237,0.00016338541,0.00065487897,0.00001766504],"about_ca_topic_score_codex":0.04931009,"about_ca_topic_score_gemma":0.0433051,"teacher_disagreement_score":0.04931009,"about_ca_system_score_codex":0.0015271577,"about_ca_system_score_gemma":0.0015774709,"threshold_uncertainty_score":0.098046124},"labels":[],"label_agreement":null},{"id":"W2348077593","doi":"","title":"Strengthen engineering budget management of construction unit is the effective way to control engineering cost","year":2002,"lang":"en","type":"article","venue":"","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CAE (Canada)","funders":"","keywords":"Diathesis; Unit (ring theory); Control (management); Cost engineering; Cost control; Project management; Engineering; Construction engineering; Engineering management; Risk analysis (engineering); Operations management; Computer science; Cost estimate; Business; Systems engineering; Medicine","score_opus":0.011664216158126715,"score_gpt":0.20853473585492252,"score_spread":0.1968705196967958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2348077593","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.053709485,0.015892997,0.6223803,0.073236644,0.004587258,0.0005040412,0.0011887752,0.0011679154,0.22733253],"genre_scores_gemma":[0.7641525,0.011973931,0.15890755,0.0033183391,0.003587041,0.00091321237,0.00070816756,0.0007447851,0.055694528],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9958047,0.0018669243,0.00031056112,0.000310637,0.0014418152,0.00026530158],"domain_scores_gemma":[0.9933349,0.0027290185,0.0015116703,0.0005942199,0.0016225288,0.00020766327],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00583376,0.0010206612,0.0007808,0.0020183031,0.0013554655,0.0044620316,0.001084715,0.0008826459,0.009710319],"category_scores_gemma":[0.022368837,0.00034201375,0.00045078373,0.0026172404,0.0011750001,0.0056622163,0.00085146056,0.0015084014,0.0013664562],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012313889,0.000106055224,0.006985338,0.00069702556,0.000087818786,0.00008136191,0.00063762435,0.030213377,0.0018272679,0.60509425,0.07613207,0.2780147],"study_design_scores_gemma":[0.00006154652,0.00033470336,0.019041752,0.00087339454,0.00013491312,0.00014958707,0.0012983808,0.049523402,0.0033822209,0.34209967,0.58295375,0.00014665448],"about_ca_topic_score_codex":0.0037162881,"about_ca_topic_score_gemma":0.0067198793,"teacher_disagreement_score":0.009710319,"about_ca_system_score_codex":0.004020148,"about_ca_system_score_gemma":0.00421737,"threshold_uncertainty_score":0.032484233},"labels":[],"label_agreement":null},{"id":"W2348733354","doi":"","title":"Financial Analysis of the Main Listed Companies of China's Paper Industry","year":2009,"lang":"en","type":"article","venue":"China Pulp & Paper","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Quarter (Canadian coin); Finance; Investment (military); China; Listed company; Financial analysis; Geography","score_opus":0.011910749844537018,"score_gpt":0.23763081673465627,"score_spread":0.22572006689011925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2348733354","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9973398,0.00015936863,0.00021776838,0.00003844529,0.00000266326,0.0000064074266,0.001245596,0.000012435319,0.0009776412],"genre_scores_gemma":[0.9978822,0.000093794195,0.00014434547,0.000005601009,0.000003787502,0.000003808706,0.0012158158,0.000001268647,0.00064942584],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99978405,0.000023119243,0.000025917274,0.000031124524,0.00008071033,0.00005512397],"domain_scores_gemma":[0.99926895,0.00015631931,0.00021693805,0.000021044481,0.00026782372,0.00006897963],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052374974,0.00032527515,0.00021134182,0.0033610559,0.00027435055,0.0005788565,0.00025076445,0.0002507011,0.0008541311],"category_scores_gemma":[0.00076630304,0.00016434396,0.00040741073,0.0022119484,0.00014951699,0.00048152258,0.00020370337,0.0001604211,0.00013606437],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020665149,0.000089663285,0.95830804,0.00007447155,0.0000916909,0.0005984103,0.00018119946,0.017166816,0.0031750493,0.0005978667,0.0012148055,0.018295292],"study_design_scores_gemma":[0.00000541321,0.00008120361,0.9640448,0.0000070097517,0.000045815766,0.0001079654,0.00020073417,0.03302099,0.0016862889,0.00012471953,0.00066336436,0.000011708613],"about_ca_topic_score_codex":0.023716545,"about_ca_topic_score_gemma":0.027204322,"teacher_disagreement_score":0.023716545,"about_ca_system_score_codex":0.0010941331,"about_ca_system_score_gemma":0.0007104141,"threshold_uncertainty_score":0.04715699},"labels":[],"label_agreement":null},{"id":"W2348917348","doi":"","title":"ITProject Portfolio Management Application Based on AHP Method","year":2010,"lang":"en","type":"article","venue":"Microcomputer applications","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Project portfolio management; Computer science; Analytic hierarchy process; Portfolio; Application portfolio management; IT portfolio management; Project management; Engineering management; Process management; Business; Operations research; Finance; Management; Economics","score_opus":0.00556481457323608,"score_gpt":0.25991329902997695,"score_spread":0.25434848445674085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2348917348","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005690343,0.000073616284,0.98983556,0.00010212405,0.000039801806,0.00021359147,0.00013168392,0.0011934991,0.0027198223],"genre_scores_gemma":[0.1732152,0.0001839059,0.82321113,0.000055912045,0.00003568178,0.000680904,0.000352134,0.00014747097,0.002117714],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99810696,0.00085845677,0.00015044613,0.0001642981,0.0006464102,0.00007343138],"domain_scores_gemma":[0.99804926,0.0011181788,0.00011608595,0.000112963666,0.0005395125,0.00006395383],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026533485,0.00067207095,0.00064819376,0.0015787248,0.0006714349,0.0010626302,0.0007041838,0.0004978096,0.005624067],"category_scores_gemma":[0.005139923,0.00033519158,0.00058204506,0.0015924536,0.0002220538,0.00078772334,0.0008569595,0.0007525356,0.0006226289],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026567857,0.00025436108,0.0031475385,0.0005078022,0.00018566838,0.00032089796,0.0005704391,0.27588058,0.0068677985,0.020471606,0.00702128,0.6845064],"study_design_scores_gemma":[0.00007902391,0.000075782904,0.0006277638,0.00006087057,0.000035040302,0.00008796715,0.00011340052,0.96921915,0.004555988,0.015325373,0.009794185,0.000025439444],"about_ca_topic_score_codex":0.002457556,"about_ca_topic_score_gemma":0.0021371383,"teacher_disagreement_score":0.005624067,"about_ca_system_score_codex":0.00046370423,"about_ca_system_score_gemma":0.0009570659,"threshold_uncertainty_score":0.018814325},"labels":[],"label_agreement":null},{"id":"W2348926810","doi":"","title":"Logistic Regression Based on Principal Component Analysis in Resolving Credit Risk Discrimination of Corporate","year":2009,"lang":"en","type":"article","venue":"Journal of Henan Institute of Engineering","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Principal component analysis; Logistic regression; Quarter (Canadian coin); Sample (material); Econometrics; Regression analysis; Principal component regression; Credit risk; Stock (firearms); Statistics; Actuarial science; Business; Economics; Mathematics; Engineering; Geography","score_opus":0.041916956392070756,"score_gpt":0.27021437346570837,"score_spread":0.2282974170736376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2348926810","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.64799684,0.0014706735,0.34353727,0.0008888453,0.00021850271,0.00024404537,0.000563974,0.0006466923,0.0044332254],"genre_scores_gemma":[0.95594126,0.00040725133,0.040721886,0.0000401719,0.000097823075,0.0000890375,0.0006258525,0.00004598244,0.002030873],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9971405,0.0021618984,0.00009398648,0.00023168094,0.00020942748,0.00016246084],"domain_scores_gemma":[0.99473554,0.0040051322,0.00026426488,0.00031331333,0.00056953373,0.000112135436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004609461,0.00073762186,0.0006777227,0.0021360088,0.00047783586,0.0008982526,0.00060470385,0.00044293044,0.0022511135],"category_scores_gemma":[0.014763627,0.00025629875,0.00075739936,0.0024103997,0.0003168689,0.0009268541,0.0006760467,0.0011840858,0.00079145527],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000926298,0.00046367332,0.3860524,0.0001409058,0.00061150856,0.0006933874,0.00029549858,0.07706175,0.0019211633,0.0067682434,0.0071819276,0.5178833],"study_design_scores_gemma":[0.000050546754,0.00014834884,0.10155902,0.00004905775,0.00015874549,0.00022443566,0.00023977214,0.888745,0.0013927668,0.0052326275,0.0021445057,0.000055171633],"about_ca_topic_score_codex":0.0050800974,"about_ca_topic_score_gemma":0.0046002413,"teacher_disagreement_score":0.0050800974,"about_ca_system_score_codex":0.0002565112,"about_ca_system_score_gemma":0.0008401629,"threshold_uncertainty_score":0.024377465},"labels":[],"label_agreement":null},{"id":"W2349401179","doi":"","title":"A brief account of the Canadian construction valuating system","year":2008,"lang":"en","type":"article","venue":"Supervision Test and Cost of Construction","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Cost accounting; Minor (academic); Coding (social sciences); Accounting; Political science; Sociology","score_opus":0.018188135591332453,"score_gpt":0.21046413179285686,"score_spread":0.1922759962015244,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2349401179","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018279798,0.006581468,0.035793222,0.0090076,0.0007807864,0.00072677695,0.0110112885,0.0011815209,0.9166376],"genre_scores_gemma":[0.36703858,0.018733598,0.11169663,0.002220349,0.00045372458,0.0004846812,0.010938967,0.0006022924,0.48783115],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9973748,0.00019614659,0.000109306,0.00019341508,0.001710967,0.00041552004],"domain_scores_gemma":[0.9987068,0.00008575448,0.000049527054,0.0000773015,0.0009724566,0.00010816404],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012508412,0.0006896812,0.00038812772,0.0058612,0.006029514,0.005150731,0.0015542455,0.00088991504,0.02014942],"category_scores_gemma":[0.0021330025,0.00043357216,0.0004984919,0.01081501,0.0016057158,0.0014695716,0.0010670536,0.001345633,0.0027375084],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057480436,0.000046801375,0.005903474,0.00031838138,0.000014130479,0.0004861445,0.0012597975,0.010829959,0.0016042654,0.66797376,0.15494652,0.15655926],"study_design_scores_gemma":[0.000006419508,0.000015521813,0.009837427,0.000117770585,0.000014246307,0.0001789564,0.00051873375,0.006027204,0.00066907384,0.012797857,0.9697113,0.00010547206],"about_ca_topic_score_codex":0.9711198,"about_ca_topic_score_gemma":0.97588295,"teacher_disagreement_score":0.06779811,"about_ca_system_score_codex":0.06779811,"about_ca_system_score_gemma":0.07290295,"threshold_uncertainty_score":0.491912},"labels":[],"label_agreement":null},{"id":"W2350545278","doi":"","title":"Important Effect in Quality Chain by Grading Essentiality of Product Quality Character","year":2007,"lang":"en","type":"article","venue":"Electronics Quality","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Discovery Air (Canada)","funders":"","keywords":"Quality (philosophy); Grading (engineering); Character (mathematics); Product (mathematics); Business; Computer science; Engineering; Mathematics; Physics","score_opus":0.020752450634070694,"score_gpt":0.34128152527706684,"score_spread":0.3205290746429961,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2350545278","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33869213,0.0021605233,0.6080606,0.0005976286,0.00021937251,0.00018460424,0.00016612791,0.00065220805,0.049266726],"genre_scores_gemma":[0.96958834,0.00044736904,0.025985092,0.000041626765,0.000032739412,0.000035496905,0.0000483626,0.000073055155,0.0037479065],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970515,0.00073734747,0.00013454976,0.00050465105,0.0013250109,0.0002468926],"domain_scores_gemma":[0.9923111,0.0032336991,0.0009939865,0.00081547,0.0022224295,0.0004232578],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021356123,0.0008357817,0.00056184246,0.0013365261,0.00082013995,0.0017178409,0.0006668294,0.0005439584,0.003592005],"category_scores_gemma":[0.008680765,0.00030579933,0.000701864,0.0010620585,0.001026925,0.0025894972,0.0012298768,0.0010079863,0.00025835767],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011008991,0.000646851,0.040062025,0.0012838872,0.00024602615,0.0007131326,0.0009314232,0.2802013,0.11757541,0.23227967,0.0028797449,0.32207972],"study_design_scores_gemma":[0.00012305622,0.0015683819,0.048212066,0.00023292516,0.0004858602,0.0007792627,0.0005553128,0.62578547,0.12592182,0.17970203,0.016365286,0.00026851174],"about_ca_topic_score_codex":0.0019582885,"about_ca_topic_score_gemma":0.0016410524,"teacher_disagreement_score":0.003592005,"about_ca_system_score_codex":0.0014005357,"about_ca_system_score_gemma":0.0008707988,"threshold_uncertainty_score":0.012016475},"labels":[],"label_agreement":null},{"id":"W2352033702","doi":"","title":"Improving the bid evaluation methods and promoting “ successful bid by reasonable low price ”","year":2002,"lang":"en","type":"article","venue":"Metal Mine Design & Construction","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Discovery Air (Canada)","funders":"","keywords":"Bid price; Unique bid auction; Business; Economics; Operations research; Microeconomics; Bidding; Finance; Engineering","score_opus":0.03357314258081994,"score_gpt":0.2764654961837021,"score_spread":0.24289235360288214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2352033702","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03196473,0.0006963632,0.95271444,0.00088440493,0.00014263713,0.0004748599,0.000079823476,0.00046458538,0.012578198],"genre_scores_gemma":[0.40704522,0.00048135023,0.5854559,0.00022234114,0.00020039052,0.000607341,0.00019562074,0.0002066566,0.005585201],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9553426,0.03125459,0.0015865215,0.0012383317,0.010084338,0.0004936051],"domain_scores_gemma":[0.91994107,0.0450706,0.0038222508,0.0063472684,0.024021233,0.000797559],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.029818946,0.0008787698,0.0012322083,0.002192321,0.0008785274,0.0040093907,0.0019878906,0.0008615079,0.0039577866],"category_scores_gemma":[0.0849811,0.00064307154,0.0007817128,0.0020223092,0.0008747631,0.0060868473,0.0010504914,0.001675455,0.0010660584],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008588146,0.0011027193,0.0123635875,0.0006662863,0.00026579172,0.0000652321,0.0007441648,0.04254206,0.0061747027,0.09219819,0.010787396,0.8322311],"study_design_scores_gemma":[0.00024876688,0.0006579824,0.011326981,0.00017177795,0.00018730102,0.00034705826,0.00068065734,0.89889294,0.012919102,0.05657121,0.017785102,0.00021117163],"about_ca_topic_score_codex":0.0019749505,"about_ca_topic_score_gemma":0.0032005445,"teacher_disagreement_score":0.029818946,"about_ca_system_score_codex":0.0022003823,"about_ca_system_score_gemma":0.0022270489,"threshold_uncertainty_score":0.15769958},"labels":[],"label_agreement":null},{"id":"W2353466815","doi":"","title":"The Effects of Investment and Financing Mode on Risk Control of Road Construction","year":2015,"lang":"en","type":"article","venue":"Technoeconomics & Management Research","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Investment (military); Finance; Business; Risk Control; Process (computing); Control (management); Risk management; Mode (computer interface); Risk financing; Risk prevention; Internal financing; Road construction; Game theory; Risk analysis (engineering); Financial risk management; Economics; Transport engineering; Computer science; Microeconomics; Engineering; Information asymmetry","score_opus":0.023489051351344607,"score_gpt":0.29721341572229504,"score_spread":0.27372436437095043,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2353466815","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93373966,0.0004186572,0.055930924,0.00030749745,0.000010561313,0.00004291179,0.000041525145,0.000022912054,0.009485271],"genre_scores_gemma":[0.9979538,0.0000858332,0.001413198,0.0000043545315,0.0000035147866,0.0000093200415,0.0000056747886,0.0000020624586,0.0005221834],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9986494,0.0006944698,0.000056606175,0.00017642233,0.00021972306,0.0002033434],"domain_scores_gemma":[0.9933941,0.0040612207,0.0013022952,0.00039627298,0.00048762286,0.00035850587],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023297733,0.000404786,0.00028676385,0.00059902435,0.00030869397,0.001201992,0.00048658505,0.00048557433,0.0020568303],"category_scores_gemma":[0.0075671896,0.00020938618,0.00043261598,0.00033899688,0.00103637,0.0017541518,0.00096377,0.0006594009,0.00008955654],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00088103674,0.0004528202,0.19457667,0.0002500303,0.00029825873,0.0009873493,0.0019839385,0.413428,0.018321311,0.23205265,0.00082880113,0.13593917],"study_design_scores_gemma":[0.00011102804,0.0011436519,0.16378964,0.00010897197,0.00037945466,0.0005361298,0.0021061313,0.6372875,0.009485246,0.18100914,0.0038876748,0.00015540727],"about_ca_topic_score_codex":0.0015173033,"about_ca_topic_score_gemma":0.0014388689,"teacher_disagreement_score":0.0023297733,"about_ca_system_score_codex":0.0009409465,"about_ca_system_score_gemma":0.00055064337,"threshold_uncertainty_score":0.012321115},"labels":[],"label_agreement":null},{"id":"W2353608765","doi":"","title":"Research on Market Power Based on Elasticity Model","year":2011,"lang":"en","type":"article","venue":"International Business Research","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Supply and demand; Manganese; Price elasticity of demand; Raw material; Economics; Elasticity (physics); Market power; China; GRASP; International market; Residual; Industrial organization; International trade; Microeconomics; Chemistry; Computer science","score_opus":0.25516704544732094,"score_gpt":0.42290092552000424,"score_spread":0.1677338800726833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2353608765","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17163923,0.0037291294,0.6776755,0.0051763738,0.00028380612,0.00013514303,0.00030401352,0.00021345375,0.14084335],"genre_scores_gemma":[0.9808895,0.001704557,0.00656852,0.00014450199,0.0001599479,0.00006105816,0.000105760555,0.000046122488,0.010320012],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99898416,0.00042351513,0.00003470804,0.00018169002,0.00021691159,0.00015904423],"domain_scores_gemma":[0.99657816,0.0024637284,0.000285059,0.0001701829,0.0003865103,0.00011649209],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001915322,0.0006706115,0.00083302276,0.0014064085,0.00044910837,0.0021106005,0.0010770782,0.000972935,0.011191374],"category_scores_gemma":[0.009197865,0.000352016,0.0010397864,0.0014053208,0.0012242928,0.006793303,0.00092937035,0.0014087437,0.00063864456],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043567532,0.00006730858,0.002944148,0.00013859497,0.00006588546,0.0002836152,0.00018668643,0.20816855,0.00075149006,0.7627609,0.0027000431,0.021889212],"study_design_scores_gemma":[0.000013000473,0.000025060406,0.0009761065,0.00002109489,0.000019667532,0.00009162162,0.00012751266,0.69955796,0.00022449301,0.29581776,0.0031075836,0.000018152617],"about_ca_topic_score_codex":0.0029322365,"about_ca_topic_score_gemma":0.0009886138,"teacher_disagreement_score":0.011191374,"about_ca_system_score_codex":0.0014548488,"about_ca_system_score_gemma":0.0007736643,"threshold_uncertainty_score":0.03743887},"labels":[],"label_agreement":null},{"id":"W2354320279","doi":"","title":"Calculating and analyse of the scientific and technological progress increases contribution rate to the agricultural output value of Heilongjiang Province","year":2006,"lang":"en","type":"article","venue":"Dongbei Nongye Daxue xuebao","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Science North","funders":"","keywords":"Agriculture; Value (mathematics); Technological change; Economics; Agricultural economics; Production (economics); Gross output; Agricultural science; Econometrics; Mathematics; Environmental science; Statistics; Macroeconomics; Geography","score_opus":0.00821796796578218,"score_gpt":0.22196981376441288,"score_spread":0.2137518457986307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2354320279","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8630945,0.0005279576,0.119972385,0.0004859587,0.000031531217,0.000057103658,0.000721945,0.00017901255,0.014929689],"genre_scores_gemma":[0.9896209,0.00027833192,0.0065181246,0.000009247369,0.0000043797068,0.00002446798,0.00018561653,0.000020944068,0.0033379497],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9998472,0.000044047272,0.000008287627,0.00002587199,0.000037225618,0.000037334197],"domain_scores_gemma":[0.9997744,0.00010954891,0.00003623709,0.000012591165,0.00005572032,0.0000114370405],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005217188,0.00034201765,0.00021425495,0.0005622454,0.00026884247,0.0007105295,0.0004183169,0.00023250455,0.0009348458],"category_scores_gemma":[0.0010531172,0.00016449542,0.0004870602,0.00057233433,0.00020052616,0.00047725544,0.00025882662,0.00028553346,0.00013320112],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026585087,0.000011304201,0.010229997,0.00003296165,0.00002148512,0.00007980148,0.000046716206,0.9722364,0.00077592826,0.004668621,0.0004098855,0.011460304],"study_design_scores_gemma":[0.000005398212,0.000012010805,0.005596816,0.000005871541,0.000013430275,0.000015059222,0.0000334164,0.99102974,0.0009192933,0.0015492224,0.00081353274,0.000006154249],"about_ca_topic_score_codex":0.106820524,"about_ca_topic_score_gemma":0.050128438,"teacher_disagreement_score":0.106820524,"about_ca_system_score_codex":0.002054906,"about_ca_system_score_gemma":0.0016433601,"threshold_uncertainty_score":0.21239752},"labels":[],"label_agreement":null},{"id":"W2354702592","doi":"","title":"Discussion of highway maintenance experimental project under contract management pattern","year":2008,"lang":"en","type":"article","venue":"Shanxi Architecture","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Highway maintenance; Contract management; Highway engineering; Transport engineering; Project management; China; Construction engineering; Engineering; Business; Systems engineering; Geography","score_opus":0.019972804671315517,"score_gpt":0.2538209185533415,"score_spread":0.23384811388202598,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2354702592","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2432727,0.0009765998,0.4817925,0.012428512,0.00033715283,0.0007601879,0.0006310557,0.0004849152,0.25931633],"genre_scores_gemma":[0.92280334,0.00071184424,0.050334826,0.0005794474,0.00012019036,0.00036203617,0.00029020585,0.00004823493,0.024749815],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99881697,0.00045119683,0.00007402351,0.0001320182,0.00040263566,0.00012315183],"domain_scores_gemma":[0.99941254,0.0002348768,0.000087234745,0.00008335937,0.00013811474,0.000043918717],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00134684,0.00016696866,0.00013206918,0.00041331418,0.0010580482,0.0010601181,0.0007888422,0.0008278484,0.004266818],"category_scores_gemma":[0.0019016168,0.00013855394,0.00043675385,0.0006487967,0.0007816297,0.0017815857,0.0006649684,0.00085887854,0.00021526527],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007706904,0.00007235362,0.0064134505,0.00009484284,0.000012181156,0.0006320544,0.00072718324,0.02942501,0.0028133786,0.91516095,0.007572272,0.03699921],"study_design_scores_gemma":[0.00009455451,0.0003488868,0.020418111,0.00018215041,0.000045855886,0.0017816898,0.002213988,0.3749158,0.00900415,0.34145415,0.24943937,0.000101183716],"about_ca_topic_score_codex":0.010933331,"about_ca_topic_score_gemma":0.0077461298,"teacher_disagreement_score":0.010933331,"about_ca_system_score_codex":0.0017469415,"about_ca_system_score_gemma":0.0020560531,"threshold_uncertainty_score":0.021739423},"labels":[],"label_agreement":null},{"id":"W2355125476","doi":"","title":"Pavement Preventive Maintenance Decision-Making Based on Group Analytical Hierarchy Process","year":2015,"lang":"en","type":"article","venue":"Technology and Economy in Areas of Communications","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Preventive maintenance; Analytic hierarchy process; Group decision-making; Reliability (semiconductor); Engineering; Process (computing); Measure (data warehouse); Operations research; Selection (genetic algorithm); Risk analysis (engineering); Transport engineering; Computer science; Reliability engineering; Data mining; Artificial intelligence; Business; Psychology","score_opus":0.02977015127112938,"score_gpt":0.3110782128542525,"score_spread":0.28130806158312316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2355125476","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043269336,0.00025300522,0.9515516,0.00031729907,0.000034414956,0.00027451228,0.00005698687,0.00010566741,0.0041371924],"genre_scores_gemma":[0.80188,0.0004092392,0.19479007,0.00007037732,0.000053019525,0.00045183775,0.00013699518,0.000021811815,0.0021866364],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99618185,0.0014512137,0.00020362397,0.00047686565,0.0013971195,0.00028925377],"domain_scores_gemma":[0.9986443,0.000724518,0.00013846315,0.00004673209,0.000355911,0.00009002376],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002974614,0.0006444194,0.0013095695,0.0014058381,0.0012223078,0.0019701677,0.0012576885,0.0009126354,0.0025956798],"category_scores_gemma":[0.0046470086,0.00050878146,0.0011058099,0.0014989775,0.00080132193,0.0016613195,0.001049843,0.0009447478,0.00019715776],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000109050954,0.00013939453,0.0018990724,0.00031475865,0.00013426616,0.00017349584,0.0008813523,0.87682104,0.0021399667,0.039031282,0.0014434628,0.07691299],"study_design_scores_gemma":[0.000035094865,0.00008992849,0.0004921865,0.00002888469,0.00004741575,0.000022905371,0.00012983648,0.9644011,0.0004925253,0.033212516,0.0010243873,0.000023235036],"about_ca_topic_score_codex":0.008395188,"about_ca_topic_score_gemma":0.006258551,"teacher_disagreement_score":0.008395188,"about_ca_system_score_codex":0.0018772457,"about_ca_system_score_gemma":0.0031769427,"threshold_uncertainty_score":0.016692638},"labels":[],"label_agreement":null},{"id":"W2355326303","doi":"","title":"Analysis of Chinese heavy truck industry","year":2008,"lang":"en","type":"article","venue":"Journal of Chang'an University","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Truck; Quarter (Canadian coin); Confidence interval; Heavy industry; Interval (graph theory); Transport engineering; Engineering; Statistics; Mathematics; Economics; Automotive engineering; Geography","score_opus":0.028839447440048006,"score_gpt":0.24064286413406938,"score_spread":0.21180341669402136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2355326303","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98696625,0.0002937617,0.0039519947,0.00017684707,0.000015569645,0.000052135892,0.0013519933,0.0000805357,0.0071108844],"genre_scores_gemma":[0.9925234,0.00023419058,0.00064326817,0.000017495215,0.0000128067095,0.000024594472,0.0016300074,0.000008750082,0.004905616],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99968696,0.000020977848,0.00001579464,0.00005932671,0.0001435131,0.000073419505],"domain_scores_gemma":[0.9997265,0.000058433427,0.00004276757,0.000016809323,0.00013009463,0.000025356278],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038373892,0.0004365917,0.00030169994,0.0028705662,0.00048014047,0.00058672397,0.0003914319,0.00025846387,0.0037444334],"category_scores_gemma":[0.00086100405,0.00017745572,0.0006926001,0.0024245554,0.00020806474,0.0004460759,0.00037572806,0.00020362958,0.00041140136],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037745837,0.00018834128,0.6248331,0.00043918638,0.0002767767,0.0019027384,0.0013013525,0.21088319,0.012736723,0.012768166,0.009022101,0.12527089],"study_design_scores_gemma":[0.000016151671,0.000081677594,0.6146833,0.0000209772,0.00008370676,0.000115063325,0.00064931536,0.37383914,0.0023037533,0.0019630964,0.0062023667,0.000041523806],"about_ca_topic_score_codex":0.13012317,"about_ca_topic_score_gemma":0.0761898,"teacher_disagreement_score":0.13012317,"about_ca_system_score_codex":0.0017266367,"about_ca_system_score_gemma":0.0015488657,"threshold_uncertainty_score":0.25873154},"labels":[],"label_agreement":null},{"id":"W2356140977","doi":"","title":"The Usage and Explanation of Statistics Method in Psychological Researches","year":2004,"lang":"en","type":"article","venue":"Journal of The Northwest Normal University","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Science North","funders":"","keywords":"Statistic; Descriptive statistics; Computer science; Statistics; Psychology; Econometrics; Mathematics","score_opus":0.030856963004668527,"score_gpt":0.29446555415975695,"score_spread":0.26360859115508845,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2356140977","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":"methods","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":"methods","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005782277,0.0050181393,0.9537966,0.013721354,0.0028694412,0.00036139146,0.00019681228,0.0005579878,0.017695962],"genre_scores_gemma":[0.1877708,0.008765416,0.785767,0.005860856,0.0025746215,0.0032036242,0.0002466803,0.00040938906,0.0054016453],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9611593,0.029284548,0.0030126015,0.0016163278,0.0044164243,0.00051080296],"domain_scores_gemma":[0.93554246,0.050196737,0.0023765282,0.0051898095,0.006258303,0.00043607884],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.03094679,0.0009921569,0.00079811976,0.004563958,0.0017704136,0.003696114,0.0015209262,0.0028880688,0.002653809],"category_scores_gemma":[0.0718391,0.0004720712,0.0010689232,0.0056583495,0.009242827,0.0048723947,0.0023092488,0.0064054322,0.00144587],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005504049,0.00008980544,0.002370034,0.00082730636,0.000049632654,0.00035918938,0.006388269,0.0020032963,0.0012532722,0.8665481,0.012450844,0.10760529],"study_design_scores_gemma":[0.000051354404,0.0001493875,0.0026120231,0.0011750304,0.00005354792,0.0007967193,0.0017000382,0.00970799,0.0024910956,0.84132725,0.13982663,0.00010901856],"about_ca_topic_score_codex":0.001273918,"about_ca_topic_score_gemma":0.0008843236,"teacher_disagreement_score":0.9690532,"about_ca_system_score_codex":0.0018102601,"about_ca_system_score_gemma":0.004123886,"threshold_uncertainty_score":0.16366422},"labels":[],"label_agreement":null},{"id":"W2356362247","doi":"","title":"Characteristics and Reference of Financial Management and Internal Audit of Canadian Universities","year":2012,"lang":"en","type":"article","venue":"Journal of Nanjing Institute of Industry Technology","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Accounting; Internal audit; Business; Audit; Finance","score_opus":0.023167247037544487,"score_gpt":0.23185206745318548,"score_spread":0.208684820415641,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2356362247","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8432186,0.008769414,0.0021808294,0.008336547,0.0002688128,0.00021312998,0.010023538,0.00026122373,0.12672783],"genre_scores_gemma":[0.98492855,0.0017130055,0.0009608797,0.00028195925,0.000040131992,0.00003125706,0.0020618686,0.000039174345,0.009943104],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9852218,0.0011011142,0.00083383865,0.00078167865,0.009028555,0.0030329241],"domain_scores_gemma":[0.9102654,0.006990063,0.010765583,0.0018711321,0.058978457,0.011129375],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0048642284,0.00039035725,0.00043034105,0.014271371,0.0056843543,0.0053879675,0.0017177681,0.00066183717,0.0035652877],"category_scores_gemma":[0.053665847,0.000308197,0.00042045175,0.030164998,0.0013129171,0.0012868195,0.0019961142,0.00095671305,0.000450886],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022804325,0.00007530029,0.7829695,0.00025485936,0.000050591458,0.00028366427,0.010609448,0.0013692059,0.0005085711,0.023406226,0.0285823,0.15166229],"study_design_scores_gemma":[0.0000051801285,0.000027847022,0.9384293,0.00017479275,0.000026168114,0.00020793232,0.005583351,0.0007941845,0.00038773366,0.0005609714,0.053733304,0.00006931569],"about_ca_topic_score_codex":0.9781717,"about_ca_topic_score_gemma":0.98075336,"teacher_disagreement_score":0.9781717,"about_ca_system_score_codex":0.09513785,"about_ca_system_score_gemma":0.11202594,"threshold_uncertainty_score":0.6902766},"labels":[],"label_agreement":null},{"id":"W2356368571","doi":"","title":"RISK EVALUATION MODEL OF STRATEGIC TARGETS SELECTION OF OVERSEAS COPPER DEVELOPMENT AND ITS APPLICATION","year":2015,"lang":"en","type":"article","venue":"Resources and Industries","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Selection (genetic algorithm); Business; Copper; Meaning (existential); Identification (biology); Index (typography); Strategic development; Risk analysis (engineering); Computer science; Artificial intelligence; Business administration","score_opus":0.10063197062801019,"score_gpt":0.2748392339365184,"score_spread":0.1742072633085082,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2356368571","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16804636,0.0002981384,0.8116112,0.0005157489,0.000033956265,0.00018849548,0.00018289291,0.00023493209,0.01888827],"genre_scores_gemma":[0.9671022,0.00018915013,0.028231932,0.00002707605,0.000008591503,0.00013604823,0.00010764158,0.000019660278,0.0041776337],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99789643,0.0008747906,0.000100240395,0.00028566152,0.0006424915,0.00020028595],"domain_scores_gemma":[0.9987575,0.0005728853,0.00018384802,0.000052639494,0.00036797018,0.000065145876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020894522,0.0009775455,0.0005396959,0.0016172903,0.0006261282,0.0016939605,0.0010110668,0.0007695778,0.0028080642],"category_scores_gemma":[0.0036383353,0.0002744612,0.0009163953,0.0010308581,0.0006362861,0.0014762424,0.0011412178,0.00076578726,0.00022143856],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063672785,0.00004585487,0.005619923,0.00005435719,0.00004497216,0.00013672175,0.00024235054,0.9464644,0.00079026783,0.02483044,0.00065083505,0.021056151],"study_design_scores_gemma":[0.000006563714,0.000045115426,0.0012939589,0.000011526183,0.000019175483,0.00004854787,0.00010748898,0.99071306,0.00041538465,0.006722958,0.0006028398,0.000013384001],"about_ca_topic_score_codex":0.016394004,"about_ca_topic_score_gemma":0.008214886,"teacher_disagreement_score":0.016394004,"about_ca_system_score_codex":0.0027718656,"about_ca_system_score_gemma":0.0023270804,"threshold_uncertainty_score":0.032597184},"labels":[],"label_agreement":null},{"id":"W2358562226","doi":"","title":"Examples and Analysis on University Ranking in Foreign Countries","year":2009,"lang":"en","type":"article","venue":"Higher Education(Research & Evaluation)","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Ranking (information retrieval); Political science; Regional science; Computer science; Geography; Information retrieval","score_opus":0.09433096548645455,"score_gpt":0.3831554564808344,"score_spread":0.28882449099437985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2358562226","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":"evaluation","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":"evaluation","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5507584,0.008468172,0.047742184,0.0022977795,0.00023204513,0.000118583084,0.0016111642,0.00032314713,0.3884485],"genre_scores_gemma":[0.9735779,0.0024567214,0.013592376,0.000086752145,0.00004080551,0.000049511975,0.0005762734,0.000033902917,0.009585689],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9982839,0.001043621,0.00007470762,0.0000712039,0.00031217333,0.00021436626],"domain_scores_gemma":[0.9976037,0.0013986547,0.0001755264,0.00013110224,0.00061512494,0.00007598058],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.0018710954,0.00027950658,0.0003849524,0.0052630063,0.0013677706,0.0012754075,0.00031983567,0.0004426993,0.005513359],"category_scores_gemma":[0.0047053145,0.00007108743,0.0005476776,0.013400135,0.00066628784,0.00094629324,0.0005333694,0.0004463645,0.00043914976],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033422885,0.00019808998,0.04291138,0.0011391515,0.0001045981,0.0020665352,0.003390218,0.09283935,0.001045772,0.5834362,0.026178893,0.24635558],"study_design_scores_gemma":[0.000089012334,0.0005654405,0.1906539,0.0011197741,0.00027293913,0.0023591497,0.01986799,0.22586374,0.006654292,0.26014918,0.29204693,0.00035769382],"about_ca_topic_score_codex":0.014955716,"about_ca_topic_score_gemma":0.015400088,"teacher_disagreement_score":0.9981289,"about_ca_system_score_codex":0.0016423607,"about_ca_system_score_gemma":0.00060989265,"threshold_uncertainty_score":0.029737353},"labels":[],"label_agreement":null},{"id":"W2360924286","doi":"","title":"Quality cost accounting in accounting calculation of construction enterprises","year":2002,"lang":"en","type":"article","venue":"Shanxi Agchitecture","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Discovery Air (Canada)","funders":"","keywords":"Cost accounting; Accounting; Throughput accounting; Management accounting; Quality (philosophy); Accounting information system; Business; Unification; Cost–volume–profit analysis; Project accounting; Accounting management; Accounting standard; Computer science","score_opus":0.023267914244665826,"score_gpt":0.2668698433617964,"score_spread":0.2436019291171306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2360924286","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09827294,0.0052950205,0.86426526,0.0014470425,0.00034195682,0.00016505938,0.00031568765,0.000414434,0.029482681],"genre_scores_gemma":[0.91531205,0.0020952467,0.07830694,0.00004399973,0.00007778856,0.00006003655,0.00023334932,0.0000600543,0.0038106237],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9963987,0.0012795774,0.00015812542,0.00016967148,0.0017810015,0.00021295233],"domain_scores_gemma":[0.9982712,0.00048138533,0.00018120228,0.00015002352,0.00087234855,0.000043802887],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025420722,0.00043100776,0.00029773498,0.0017819842,0.0005090871,0.0027852908,0.00066086336,0.00042609897,0.0012024157],"category_scores_gemma":[0.007376809,0.00020682358,0.00042342496,0.0030611677,0.00043436768,0.002064229,0.00056032557,0.0004856532,0.00023098369],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015385405,0.000047768608,0.019712402,0.00034274426,0.0000948542,0.00012492653,0.0002969673,0.4279502,0.0015957241,0.23951256,0.0066035236,0.30356452],"study_design_scores_gemma":[0.000021487296,0.00007372539,0.0115101,0.00012505306,0.00011935446,0.00013251424,0.00023469598,0.89158416,0.004403459,0.06494564,0.02679614,0.000053613352],"about_ca_topic_score_codex":0.014976089,"about_ca_topic_score_gemma":0.010429666,"teacher_disagreement_score":0.014976089,"about_ca_system_score_codex":0.0021998638,"about_ca_system_score_gemma":0.0024434554,"threshold_uncertainty_score":0.029777825},"labels":[],"label_agreement":null},{"id":"W2361481796","doi":"","title":"PRILIMINARY DISCUSSION ON GOVERNMENT-ENTERPRISE CHESS-PLAYING MODEL FOR MINING RIGHT EVALUATION","year":2006,"lang":"en","type":"article","venue":"","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CAE (Canada)","funders":"","keywords":"Key (lock); Expression (computer science); Government (linguistics); Computer science; Perfection; Action (physics); Factor (programming language); Balance (ability); Knowledge management; Process management; Operations research; Business; Computer security; Psychology; Engineering; Epistemology; Programming language","score_opus":0.028550225710379372,"score_gpt":0.271943742294288,"score_spread":0.24339351658390865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2361481796","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032744862,0.0063352957,0.31371045,0.080119364,0.0017106684,0.00015716624,0.00028721604,0.00014391198,0.564791],"genre_scores_gemma":[0.9020928,0.0041704327,0.027390458,0.006501667,0.00096778333,0.00023047696,0.000120182296,0.0000691847,0.058457028],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9975441,0.0008591468,0.00016513704,0.00036528803,0.0008176439,0.0002485911],"domain_scores_gemma":[0.99803025,0.0010792663,0.00013016554,0.0001674695,0.0004776334,0.0001151618],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002807375,0.0004222067,0.00040582614,0.0011872776,0.0019722718,0.0034441166,0.0011079963,0.0028099301,0.011260817],"category_scores_gemma":[0.004865699,0.00017290708,0.00095379574,0.0009698864,0.003901021,0.0057293014,0.0014774962,0.0030046117,0.0008900105],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004489748,0.0000058797077,0.000106474916,0.000021805054,0.0000024713343,0.00003339504,0.0001026424,0.00061454636,0.000046277222,0.9955402,0.0015404976,0.0019813005],"study_design_scores_gemma":[0.000011998144,0.000026968573,0.00059044966,0.00011712246,0.000015460968,0.00010506432,0.0003458777,0.014094668,0.0003828048,0.93080246,0.053483836,0.000023257653],"about_ca_topic_score_codex":0.0062188725,"about_ca_topic_score_gemma":0.00484509,"teacher_disagreement_score":0.011260817,"about_ca_system_score_codex":0.0051203854,"about_ca_system_score_gemma":0.0028033385,"threshold_uncertainty_score":0.03767115},"labels":[],"label_agreement":null},{"id":"W2362826640","doi":"","title":"Financial risk assessment for overseas mining investment based on matter element model","year":2014,"lang":"en","type":"article","venue":"China Mining Magazine","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Investment (military); Financial risk; Index (typography); Business; Finance; Country risk; Element (criminal law); Delphi method; Resource (disambiguation); Political science; Statistics; Computer science","score_opus":0.016147397912444225,"score_gpt":0.26157130888802604,"score_spread":0.2454239109755818,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2362826640","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43767,0.00075452914,0.522208,0.000994522,0.00009375167,0.00034065548,0.00026921878,0.00012300283,0.0375464],"genre_scores_gemma":[0.97655153,0.00033553177,0.018825233,0.000035086246,0.000017642,0.0001663378,0.00008792848,0.000009768582,0.0039708796],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986767,0.0006053924,0.000062555686,0.00011728073,0.0003877855,0.00015032584],"domain_scores_gemma":[0.9990163,0.0005347983,0.00012792838,0.000029975055,0.0002443831,0.000046671626],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017565791,0.00080281077,0.0006428086,0.0014329726,0.00058207,0.0017187503,0.00074343145,0.0008809974,0.0024878415],"category_scores_gemma":[0.002417053,0.00025925858,0.001036567,0.00089460413,0.0004998177,0.0011726499,0.0008783135,0.000684732,0.00014811332],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006827146,0.000079580816,0.008677826,0.000085088854,0.000069126305,0.00015748468,0.00022221018,0.9495764,0.00085758633,0.022566568,0.0007733997,0.016866598],"study_design_scores_gemma":[0.000005994746,0.000055622484,0.001843359,0.000017109884,0.000020310721,0.0000322559,0.00011497691,0.99079835,0.0002264562,0.006264964,0.0006088599,0.0000118450025],"about_ca_topic_score_codex":0.008725907,"about_ca_topic_score_gemma":0.005188364,"teacher_disagreement_score":0.008725907,"about_ca_system_score_codex":0.001546513,"about_ca_system_score_gemma":0.001342842,"threshold_uncertainty_score":0.017350256},"labels":[],"label_agreement":null},{"id":"W2363493011","doi":"","title":"Study on Selection of Project Contractors Based on CBR","year":2010,"lang":"en","type":"article","venue":"Contemporary Chemical Industry","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"","keywords":"Bidding; Intellectualization; Procurement; Construction bidding; Frame (networking); Expert system; Selection (genetic algorithm); Tacit knowledge; Function (biology); Process (computing); Project management; Operations research; Knowledge management; Computer science; Engineering; Business; Systems engineering; Artificial intelligence; Project planning; Pre-construction services","score_opus":0.07391359729884989,"score_gpt":0.3137753010708767,"score_spread":0.2398617037720268,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2363493011","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3684526,0.0047467286,0.5677506,0.002154418,0.00022512452,0.0010177536,0.00015435736,0.00037167023,0.05512678],"genre_scores_gemma":[0.87801576,0.0025668528,0.111756876,0.00021523543,0.00011281214,0.00022928545,0.00019998477,0.000042598225,0.0068605766],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9923923,0.004724871,0.00026425507,0.0005628972,0.001622477,0.00043312932],"domain_scores_gemma":[0.992766,0.0054523083,0.00025441695,0.0003245526,0.0010413245,0.00016129523],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00519236,0.0004564534,0.00087864924,0.0023276405,0.0007980874,0.0017753028,0.0014363048,0.0008378165,0.0025148247],"category_scores_gemma":[0.016266577,0.00028636822,0.000511693,0.0029071593,0.00052040216,0.0020267207,0.0004737818,0.000718322,0.00029914],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005351312,0.0009539067,0.019919455,0.0010276581,0.00018139486,0.0009834172,0.0025444804,0.12817286,0.004758364,0.08925546,0.007847131,0.7438208],"study_design_scores_gemma":[0.00020370395,0.00042583223,0.008064361,0.00023954925,0.0001491547,0.0007964517,0.0021764229,0.9388493,0.004465063,0.0248665,0.019686367,0.00007732873],"about_ca_topic_score_codex":0.006546425,"about_ca_topic_score_gemma":0.003340501,"teacher_disagreement_score":0.006546425,"about_ca_system_score_codex":0.0011532085,"about_ca_system_score_gemma":0.001363143,"threshold_uncertainty_score":0.027460098},"labels":[],"label_agreement":null},{"id":"W2363524633","doi":"","title":"Review on International Risk Management Practices in Government Public Service Sector","year":2013,"lang":"en","type":"article","venue":"Standard Science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Risk management; Business; Public sector; Value (mathematics); Process (computing); Service (business); Risk analysis (engineering); Public administration; Political science; Finance; Marketing; Economics; Computer science; Economy","score_opus":0.043244637329310234,"score_gpt":0.3134190415395866,"score_spread":0.2701744042102764,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2363524633","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013163151,0.9901624,0.0006450507,0.0015630705,0.00024178978,0.000012973691,0.000115426665,0.000012148734,0.005930885],"genre_scores_gemma":[0.01296063,0.9854702,0.0005400005,0.0003435622,0.00012390174,0.000012853533,0.00010965127,0.0000065998197,0.00043265303],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9978543,0.00060038094,0.00052545045,0.00017949165,0.00074709347,0.000093264796],"domain_scores_gemma":[0.99054015,0.0044030696,0.0016390355,0.00024066736,0.0030288948,0.00014811767],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004028112,0.0005120997,0.00069572293,0.005505526,0.0002925511,0.0015488192,0.000601407,0.0004521374,0.0019675975],"category_scores_gemma":[0.007957122,0.00020479549,0.00062054355,0.012070002,0.0004749849,0.00152609,0.000537851,0.0006096662,0.00041511355],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007646702,0.00002909813,0.0015735367,0.027257398,0.00015672755,0.000082206534,0.0003877413,0.00069582363,0.0004553811,0.0062511237,0.024286708,0.93874776],"study_design_scores_gemma":[0.000012965467,0.00017744668,0.011766522,0.044825453,0.0008031126,0.0005068115,0.00094249845,0.0002588725,0.0012091723,0.0019349698,0.93753046,0.000031720578],"about_ca_topic_score_codex":0.006658979,"about_ca_topic_score_gemma":0.009981105,"teacher_disagreement_score":0.006658979,"about_ca_system_score_codex":0.0019199043,"about_ca_system_score_gemma":0.006302557,"threshold_uncertainty_score":0.021302938},"labels":[],"label_agreement":null},{"id":"W2364256479","doi":"","title":"On the Mode of Equipment Bidding Procurement Based on Fundamental Principle of Comprehensive Cost-Performance Ratio","year":2008,"lang":"en","type":"article","venue":"Research and Exploration in Laboratory","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"L'Alliance Boviteq","funders":"","keywords":"Bidding; Procurement; Mode (computer interface); Quality (philosophy); Business; Reliability engineering; Operations management; Risk analysis (engineering); Computer science; Engineering; Marketing","score_opus":0.17388737760796866,"score_gpt":0.37059884013531835,"score_spread":0.1967114625273497,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2364256479","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058732808,0.00038058023,0.9002993,0.0005095349,0.00006682025,0.00013769462,0.00008218969,0.00020569038,0.039585426],"genre_scores_gemma":[0.85232985,0.0005131426,0.13651222,0.00009170449,0.00007878537,0.00022489692,0.00009009903,0.00009951002,0.010059894],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99775237,0.00078078517,0.000102329686,0.00039602147,0.0007658262,0.00020270633],"domain_scores_gemma":[0.9982218,0.0008316737,0.00016059191,0.0001936316,0.0005050751,0.00008725538],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025652167,0.0005436572,0.00061885256,0.0012714214,0.000607321,0.0023343118,0.0013156955,0.00069164863,0.0058149295],"category_scores_gemma":[0.00537358,0.00038147334,0.0008325244,0.0010543786,0.001396697,0.004736722,0.0009482345,0.001132508,0.0007180554],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015454969,0.0000942294,0.0056357626,0.000177174,0.00006048162,0.00029400573,0.00091346685,0.069456175,0.0072729136,0.8217786,0.00326295,0.09089976],"study_design_scores_gemma":[0.00004937549,0.00021403682,0.0036050598,0.000048205864,0.000048830276,0.0009200321,0.0005288805,0.5546415,0.0044489168,0.4270617,0.008314414,0.00011906912],"about_ca_topic_score_codex":0.0014259497,"about_ca_topic_score_gemma":0.0008726835,"teacher_disagreement_score":0.0058149295,"about_ca_system_score_codex":0.0014032933,"about_ca_system_score_gemma":0.0010233485,"threshold_uncertainty_score":0.01945293},"labels":[],"label_agreement":null},{"id":"W2364453826","doi":"","title":"Research on Profitability of Highway Listed Companies Based on ROE","year":2012,"lang":"en","type":"article","venue":"Value Engineering","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Profitability index; Business; Gross margin; Quarter (Canadian coin); Margin (machine learning); Finance; Accounting; Geography; Computer science","score_opus":0.09705835826749502,"score_gpt":0.33348040750927693,"score_spread":0.2364220492417819,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2364453826","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9774276,0.0017448432,0.005971849,0.0005351914,0.0000138702335,0.00002892341,0.00081749406,0.000020377778,0.013439955],"genre_scores_gemma":[0.9980064,0.00039279234,0.00042801286,0.000015599462,0.000012094218,0.000005887032,0.00037347362,0.0000017477425,0.0007638611],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993907,0.0001454515,0.000037671434,0.0000865653,0.00022858764,0.00011093632],"domain_scores_gemma":[0.9977749,0.0009117368,0.00068685255,0.000060328857,0.00045735858,0.000108838176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008989735,0.00018591192,0.00033697672,0.002485216,0.00026792998,0.0011922278,0.00026442434,0.0002389487,0.0012211557],"category_scores_gemma":[0.0028445756,0.00008274723,0.00029385937,0.002363271,0.0003054654,0.0019854277,0.000372842,0.00038555788,0.00018590677],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016509705,0.00019619918,0.8264279,0.00026622668,0.00027752478,0.0005514296,0.0006101206,0.05903424,0.0021940465,0.023117535,0.0030086285,0.08415116],"study_design_scores_gemma":[0.000011606537,0.00041649793,0.81632185,0.00014002499,0.00012048654,0.00041525578,0.003466202,0.1559313,0.0025340323,0.009528886,0.011031416,0.00008250884],"about_ca_topic_score_codex":0.0067781536,"about_ca_topic_score_gemma":0.013868297,"teacher_disagreement_score":0.0067781536,"about_ca_system_score_codex":0.0013827804,"about_ca_system_score_gemma":0.0005141032,"threshold_uncertainty_score":0.013477385},"labels":[],"label_agreement":null},{"id":"W2366177004","doi":"","title":"Undesirable SBM system efficiency evaluation methods based on non-separable variables","year":2015,"lang":"en","type":"article","venue":"Systems engineering and electronics","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Separable space; Basis (linear algebra); Mathematical optimization; Sensitivity (control systems); Computer science; Production (economics); Measure (data warehouse); Process (computing); Mathematics; Engineering; Data mining; Economics","score_opus":0.029551059526047776,"score_gpt":0.2840990528464797,"score_spread":0.25454799332043193,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2366177004","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015488095,0.00013801742,0.9816815,0.000065631175,0.000019102876,0.000047015685,0.00004700062,0.00012337044,0.002390178],"genre_scores_gemma":[0.8127034,0.00032641555,0.18300933,0.000059099086,0.000036335314,0.00042562466,0.00023976964,0.000115226205,0.0030848207],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.997474,0.001131374,0.00013873138,0.0003105328,0.00079629105,0.00014891231],"domain_scores_gemma":[0.9985775,0.00065867143,0.00024515932,0.0001283537,0.00034987216,0.000040596813],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030764095,0.0012394459,0.0007979977,0.0014552,0.00036669336,0.0012236864,0.0009845251,0.0003998301,0.0023555737],"category_scores_gemma":[0.0038326492,0.00036707253,0.0011720055,0.0012378236,0.00079052255,0.0015634439,0.0011911795,0.00097516,0.00022621361],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013725211,0.000109966626,0.003509357,0.00037091164,0.00012495993,0.000067589455,0.00014051524,0.8452174,0.0052043954,0.07014024,0.0012932755,0.07368405],"study_design_scores_gemma":[0.000008879183,0.000074108626,0.00062894553,0.0000153586,0.000014600177,0.000017278682,0.000017678636,0.9878227,0.0014018056,0.009343601,0.0006450559,0.000009977623],"about_ca_topic_score_codex":0.0025617552,"about_ca_topic_score_gemma":0.0018282171,"teacher_disagreement_score":0.0030764095,"about_ca_system_score_codex":0.0013787841,"about_ca_system_score_gemma":0.0012061169,"threshold_uncertainty_score":0.016269803},"labels":[],"label_agreement":null},{"id":"W2367403158","doi":"","title":"A Research on the Identifying Model of the Core Competence of the Corporation Based on the AHP","year":2001,"lang":"en","type":"article","venue":"","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Discovery Air (Canada)","funders":"","keywords":"Analytic hierarchy process; Corporation; Core competency; Competence (human resources); Computer science; Operations research; Knowledge management; Management; Business; Engineering; Marketing; Economics; Finance","score_opus":0.3937997558106273,"score_gpt":0.3721618412836966,"score_spread":0.0216379145269307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2367403158","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.055570684,0.00045432767,0.9304037,0.0008347245,0.000036810965,0.00040862942,0.00012087026,0.0001509002,0.01201935],"genre_scores_gemma":[0.7408644,0.0008373483,0.2555786,0.000078843004,0.00003922505,0.0004895,0.0002202584,0.000022331204,0.0018694907],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9945364,0.0028298919,0.00025533023,0.0005023454,0.0016354964,0.00024046247],"domain_scores_gemma":[0.9960001,0.00201193,0.00036832798,0.00020777354,0.0012344946,0.00017734496],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0061155134,0.00056537136,0.0006032616,0.0025258583,0.0010503877,0.002436401,0.00077414175,0.00052049145,0.0019563884],"category_scores_gemma":[0.010779374,0.00024898362,0.00059821416,0.00254511,0.0013495551,0.0036627722,0.0010671417,0.0010862739,0.00014805148],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017038226,0.00028782955,0.013508936,0.0011225987,0.0002299403,0.00018851012,0.0031827793,0.22547944,0.004938704,0.47587234,0.0037351465,0.27128342],"study_design_scores_gemma":[0.00007128173,0.00026444017,0.004870497,0.0002731174,0.00009141361,0.000105291925,0.0016750823,0.8254644,0.0035371683,0.15597409,0.0075956914,0.00007751391],"about_ca_topic_score_codex":0.0073373294,"about_ca_topic_score_gemma":0.003944509,"teacher_disagreement_score":0.0073373294,"about_ca_system_score_codex":0.0029415453,"about_ca_system_score_gemma":0.0052693184,"threshold_uncertainty_score":0.032342315},"labels":[],"label_agreement":null},{"id":"W2368191545","doi":"","title":"An evaluation of work efficiency of a certain new hospital by TOPSIS method","year":2007,"lang":"en","type":"article","venue":"Chinese Journal of Hospital Statistics","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); TOPSIS; Work (physics); Operations management; Medicine; Operations research; Engineering; Geography","score_opus":0.012848158625213312,"score_gpt":0.3232221225940721,"score_spread":0.3103739639688588,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2368191545","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8411101,0.00049205666,0.13677676,0.0003066944,0.00010653453,0.0006192266,0.0023687405,0.0002650354,0.017954899],"genre_scores_gemma":[0.9659123,0.00016468101,0.031102326,0.000013894503,0.00002196903,0.0002476754,0.0009797341,0.000017147622,0.0015403534],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9947818,0.0015406295,0.0005426371,0.00042529873,0.002403591,0.00030595643],"domain_scores_gemma":[0.99380577,0.0022650266,0.0011471143,0.0002985521,0.0022760818,0.00020744394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036917427,0.0008145731,0.00077760307,0.0046934313,0.00045882782,0.0019614021,0.00052650744,0.0003643175,0.0032535288],"category_scores_gemma":[0.01018626,0.00017785873,0.0009434736,0.00473931,0.000561578,0.0012281173,0.0006685503,0.00034679292,0.0004351813],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009096734,0.0005477744,0.42312607,0.0010186703,0.0011747696,0.0005513064,0.00142552,0.26429868,0.008277676,0.010207003,0.0062086424,0.28225428],"study_design_scores_gemma":[0.000092562856,0.0023327337,0.38566115,0.00017875237,0.0003905981,0.000392682,0.004477072,0.5843404,0.0073842527,0.00670332,0.00787793,0.0001684977],"about_ca_topic_score_codex":0.004596893,"about_ca_topic_score_gemma":0.0034748442,"teacher_disagreement_score":0.0046934313,"about_ca_system_score_codex":0.0020142205,"about_ca_system_score_gemma":0.0014130938,"threshold_uncertainty_score":0.019524038},"labels":[],"label_agreement":null},{"id":"W2368279181","doi":"","title":"Application of Comprehensive Evaluation Methods to Pharmaceutical Research","year":2012,"lang":"en","type":"article","venue":"Chinese Journal of Pharmaceuticals","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"L'Alliance Boviteq","funders":"","keywords":"Key (lock); Evaluation methods; Fuzzy logic; Computer science; Statistical analysis; Data mining; Management science; Biochemical engineering; Artificial intelligence; Reliability engineering; Engineering; Mathematics; Statistics","score_opus":0.27494640570825346,"score_gpt":0.5896037985930745,"score_spread":0.3146573928848211,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2368279181","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003560879,0.025648216,0.9511848,0.0009088926,0.00020873432,0.0002083324,0.00011269838,0.00028811794,0.017879367],"genre_scores_gemma":[0.26393604,0.04231762,0.68583035,0.00050585,0.0008006243,0.00092407665,0.0002629989,0.00011176332,0.005310621],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9890407,0.0044693253,0.0006195266,0.00060438656,0.0050779385,0.00018802281],"domain_scores_gemma":[0.995096,0.0030009872,0.00038161132,0.00033240824,0.00109306,0.0000958869],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009897054,0.0011022672,0.0015651956,0.0069333566,0.0006166377,0.0030493597,0.0011100946,0.000874741,0.0018617989],"category_scores_gemma":[0.0111321965,0.00036493936,0.0012793897,0.006210073,0.0016270238,0.0017967459,0.0020981699,0.0013232934,0.00034111613],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047537098,0.00008493799,0.0012200229,0.0022650778,0.0005668589,0.00023926568,0.00038598457,0.08508997,0.0025351816,0.42144012,0.0072109867,0.47891402],"study_design_scores_gemma":[0.000051278716,0.00023391042,0.002664375,0.00083583454,0.00028416555,0.00040397432,0.00024676067,0.23943381,0.0037453664,0.67283875,0.079105824,0.00015590958],"about_ca_topic_score_codex":0.0019223439,"about_ca_topic_score_gemma":0.002005677,"teacher_disagreement_score":0.009897054,"about_ca_system_score_codex":0.0020254846,"about_ca_system_score_gemma":0.0031485746,"threshold_uncertainty_score":0.052341223},"labels":[],"label_agreement":null},{"id":"W2368354808","doi":"","title":"The Ascending Ordered Weighted Euclid Averaging Operator and Its Application to Decision Making","year":2004,"lang":"en","type":"article","venue":"Journal of Nanjing Institute of Technology","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Discovery Air (Canada)","funders":"","keywords":"Operator (biology); Monotonic function; Mathematics; Commutative property; Aggregate (composite); Algorithm; Applied mathematics; Discrete mathematics; Mathematical analysis","score_opus":0.010138266051057538,"score_gpt":0.2737755928272934,"score_spread":0.26363732677623586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2368354808","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035984868,0.00046216766,0.9944516,0.00010042161,0.00005109725,0.000018112447,0.000017597946,0.000041048006,0.0012595231],"genre_scores_gemma":[0.1383202,0.0011940119,0.85890156,0.00008806023,0.00016492503,0.00011950211,0.000064836066,0.000035835354,0.0011110929],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9959448,0.0017118199,0.0003658188,0.0005539662,0.0012878953,0.00013567327],"domain_scores_gemma":[0.997352,0.0014405289,0.00022940875,0.00016998174,0.0007134876,0.000094511335],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034821944,0.0008928903,0.0011511967,0.0015327542,0.00069149304,0.0013708789,0.0009703379,0.00070676516,0.0012321667],"category_scores_gemma":[0.0065582693,0.00027917474,0.0013732977,0.0029886502,0.0015507046,0.0022506583,0.0012832241,0.0014425176,0.00020980506],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013651571,0.00008508883,0.00093536195,0.0005297153,0.00025422248,0.0002470943,0.00056121853,0.18147166,0.009752893,0.47642794,0.0025179908,0.3270802],"study_design_scores_gemma":[0.00001453591,0.00018414963,0.00048461513,0.000040991916,0.000063717955,0.0001800934,0.00006919871,0.7280208,0.0040354975,0.26081112,0.006018039,0.00007718863],"about_ca_topic_score_codex":0.002512228,"about_ca_topic_score_gemma":0.0016770549,"teacher_disagreement_score":0.0034821944,"about_ca_system_score_codex":0.00080698053,"about_ca_system_score_gemma":0.001106213,"threshold_uncertainty_score":0.018415809},"labels":[],"label_agreement":null},{"id":"W2368403740","doi":"","title":"Combing Core Items and Additional Items:Essence of Student Evaluation Index System of Educational Quality(SEEQ)of Universities in Canada——The Case of University of Manitoba","year":2013,"lang":"en","type":"article","venue":"Comparative Education Review","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Index (typography); Quality (philosophy); Democracy; Humanism; Core competency; Flexibility (engineering); Core (optical fiber); Sociology; Personality; Mathematics education; Psychology; Computer science; Medical education; Management; Political science; Marketing; Business; Social psychology; Medicine; Law; Politics; Economics","score_opus":0.09029172719945915,"score_gpt":0.34666568774111656,"score_spread":0.2563739605416574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2368403740","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.65539974,0.016755013,0.08030946,0.006952599,0.00050509867,0.0031182112,0.0069619142,0.000480381,0.22951761],"genre_scores_gemma":[0.9481022,0.0020010704,0.042518057,0.00021784053,0.00002761348,0.0005923936,0.0018335441,0.000020167938,0.0046872008],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9931972,0.0024228513,0.0007284139,0.00028464705,0.00304359,0.00032335552],"domain_scores_gemma":[0.9868175,0.0021809966,0.00074052636,0.0005033659,0.009404341,0.00035333034],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008409068,0.00035898722,0.0006720726,0.004561654,0.001332807,0.002721137,0.0008884908,0.0003571175,0.0015174024],"category_scores_gemma":[0.013443361,0.00019632973,0.00071629626,0.011718142,0.0014584624,0.0010319548,0.0010198875,0.0005030018,0.00019092618],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003166376,0.00016722188,0.37075156,0.0028130321,0.00054585614,0.00018645506,0.006815346,0.0043034735,0.0019676671,0.044453762,0.012185891,0.55549306],"study_design_scores_gemma":[0.00006163179,0.00032852413,0.89362836,0.001066136,0.00068739866,0.00023258998,0.011765738,0.006889781,0.0029035138,0.010572147,0.071757555,0.00010660787],"about_ca_topic_score_codex":0.5021413,"about_ca_topic_score_gemma":0.6153682,"teacher_disagreement_score":0.987034,"about_ca_system_score_codex":0.0129659735,"about_ca_system_score_gemma":0.03189825,"threshold_uncertainty_score":0.99843705},"labels":[],"label_agreement":null},{"id":"W2368967620","doi":"","title":"A Quantitative Assessment Model of Turnover Risk on Software Project","year":2005,"lang":"en","type":"article","venue":"Microcomputer applications","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Key (lock); Software; Order (exchange); Risk analysis (engineering); Affect (linguistics); Computer security; Business","score_opus":0.031463935010382395,"score_gpt":0.3118177124880827,"score_spread":0.2803537774777003,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2368967620","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05490547,0.00030076178,0.93540704,0.0005072945,0.00002250962,0.000105477775,0.00022404561,0.00024577606,0.008281545],"genre_scores_gemma":[0.9291531,0.00043461416,0.062739395,0.000060088816,0.000041386753,0.00035423224,0.00025080476,0.000055082834,0.006911216],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99636555,0.0016644459,0.00015502576,0.0004739205,0.0010318308,0.00030920655],"domain_scores_gemma":[0.9934603,0.0037821156,0.0010342348,0.00031332733,0.0012091689,0.00020084012],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004842865,0.0011965847,0.00068853656,0.0020134374,0.00040708287,0.0017924366,0.0015632095,0.0012942923,0.0031358688],"category_scores_gemma":[0.010680085,0.00043307652,0.00079116505,0.0013713653,0.0009364724,0.0025115353,0.0009700001,0.001147771,0.0004818575],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005136657,0.000055969598,0.0023639544,0.00007816102,0.00003178055,0.000098543656,0.00015056954,0.9353376,0.0010181173,0.044580195,0.0006254701,0.015608207],"study_design_scores_gemma":[0.000005934112,0.00004905752,0.00060799473,0.000009966183,0.000012069391,0.00004798169,0.000020217381,0.9888576,0.00014092722,0.009847872,0.00038876,0.0000115735065],"about_ca_topic_score_codex":0.0047761835,"about_ca_topic_score_gemma":0.002492448,"teacher_disagreement_score":0.004842865,"about_ca_system_score_codex":0.002007972,"about_ca_system_score_gemma":0.0011431751,"threshold_uncertainty_score":0.025611818},"labels":[],"label_agreement":null},{"id":"W2370261403","doi":"","title":"Project Controlling System Design and Implement","year":2006,"lang":"en","type":"article","venue":"Microcomputer applications","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Reusability; Software engineering; Systems engineering; Systems design; Currency; Engineering management; Operating system","score_opus":0.01606437276948343,"score_gpt":0.24116780778757732,"score_spread":0.22510343501809388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2370261403","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013532519,0.00031005562,0.929948,0.00037465015,0.00013569841,0.00073219306,0.00019308993,0.0067713466,0.04800248],"genre_scores_gemma":[0.4424045,0.000991424,0.48325154,0.00033070223,0.0001485765,0.0021133227,0.001377109,0.0010242548,0.068358526],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987431,0.00019445442,0.000106147854,0.00023789023,0.00061066455,0.00010772159],"domain_scores_gemma":[0.9995345,0.00006635058,0.000032760887,0.000091657974,0.00023852733,0.000036221936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009933803,0.0005336425,0.00032107547,0.0008381615,0.00065408635,0.0018603986,0.0009476984,0.00054841675,0.0089367805],"category_scores_gemma":[0.0016151959,0.00031066086,0.00038867127,0.00044325503,0.00040673206,0.0016228156,0.0008258719,0.00056411314,0.0025713767],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026328303,0.00020106834,0.004881916,0.0006831817,0.00007612678,0.00028058302,0.00092243426,0.03256698,0.040128816,0.10482226,0.028425254,0.7867481],"study_design_scores_gemma":[0.00030299634,0.0008013244,0.0064077494,0.00035990577,0.00023431143,0.0012539324,0.0006925572,0.34234485,0.10606289,0.034285385,0.5070176,0.00023655275],"about_ca_topic_score_codex":0.0036546616,"about_ca_topic_score_gemma":0.00127752,"teacher_disagreement_score":0.0089367805,"about_ca_system_score_codex":0.00059498585,"about_ca_system_score_gemma":0.00152426,"threshold_uncertainty_score":0.029896557},"labels":[],"label_agreement":null},{"id":"W2371991383","doi":"","title":"Developing Countermeasures on China's Metal and Nonmetal Mine Safety Standards","year":2011,"lang":"en","type":"article","venue":"Standard Science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Nonmetal; China; Service (business); Mine safety; Safety standards; Engineering; Forensic engineering; Political science; Business; Law; Waste management; Metal; Marketing","score_opus":0.03680983294861191,"score_gpt":0.2814724218870691,"score_spread":0.24466258893845722,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2371991383","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5614243,0.005412062,0.32380807,0.017501218,0.00048801806,0.0006954145,0.00017367887,0.0005291368,0.089968055],"genre_scores_gemma":[0.97690123,0.0016615452,0.016679551,0.0003076737,0.00004924409,0.00011663931,0.00008452689,0.000015194576,0.0041843764],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.997157,0.00081200467,0.00013127105,0.00021996978,0.0013439258,0.00033586775],"domain_scores_gemma":[0.9974482,0.00056718866,0.00043872063,0.00015173265,0.0012669042,0.00012718681],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004649005,0.0005653718,0.0005253011,0.0013651886,0.00068174524,0.0017884924,0.0011898568,0.00096854696,0.0013634565],"category_scores_gemma":[0.0052152374,0.00019670729,0.0004501733,0.0009374276,0.0008643895,0.0016627595,0.0016153251,0.00078149565,0.00008400421],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001453989,0.00027169814,0.025972491,0.00060650276,0.000110592126,0.00025851378,0.0005288407,0.3690216,0.005351192,0.3451038,0.010695601,0.24193382],"study_design_scores_gemma":[0.00013665375,0.0005770741,0.029660387,0.00030993274,0.00014801703,0.000101932994,0.0013335872,0.784816,0.011591899,0.12845828,0.04278571,0.00008045712],"about_ca_topic_score_codex":0.025029307,"about_ca_topic_score_gemma":0.020893715,"teacher_disagreement_score":0.025029307,"about_ca_system_score_codex":0.004333195,"about_ca_system_score_gemma":0.011035115,"threshold_uncertainty_score":0.049767256},"labels":[],"label_agreement":null},{"id":"W2373583039","doi":"","title":"Testing System for Agro-products' Quality & Safety in Foreign Countries and its Enlightenment to China","year":2008,"lang":"en","type":"article","venue":"Journal of Agricultural Science and Technology","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Quality (philosophy); Product (mathematics); Business; Enlightenment; Quality management system; Financial institution; Risk analysis (engineering); Environmental economics; Quality management; Marketing; Economics; Finance; Political science","score_opus":0.02648785979762725,"score_gpt":0.25426517105932334,"score_spread":0.2277773112616961,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2373583039","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9059784,0.0005127965,0.07181358,0.00070666644,0.000049365062,0.00033792437,0.0004689942,0.0005927715,0.019539474],"genre_scores_gemma":[0.98196524,0.00020062714,0.013377413,0.000051187173,0.000008234951,0.00008545523,0.00046649677,0.000026085372,0.0038192656],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99732214,0.00091445644,0.00021204552,0.00031861264,0.00088350626,0.00034924512],"domain_scores_gemma":[0.9958117,0.0010715993,0.00039316394,0.00027231983,0.0022202781,0.00023095444],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005119917,0.00055219384,0.0004013188,0.0017439828,0.0008650829,0.0012879604,0.00066507835,0.00038205,0.001960215],"category_scores_gemma":[0.005752188,0.00017605821,0.00047076985,0.001545406,0.00058840716,0.0010312028,0.00087314926,0.00037623078,0.00022146812],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001875858,0.0005233409,0.2448597,0.00067718304,0.00016488372,0.0012986318,0.0032707045,0.2664729,0.028698964,0.04041051,0.011349299,0.40039802],"study_design_scores_gemma":[0.00027614468,0.0016480085,0.1840109,0.0001380021,0.00029226413,0.00053081324,0.00316285,0.7320946,0.041715637,0.010378937,0.025590485,0.00016136635],"about_ca_topic_score_codex":0.03684438,"about_ca_topic_score_gemma":0.020022271,"teacher_disagreement_score":0.03684438,"about_ca_system_score_codex":0.0038749822,"about_ca_system_score_gemma":0.0036278958,"threshold_uncertainty_score":0.07325983},"labels":[],"label_agreement":null},{"id":"W2373724684","doi":"","title":"The Construction of Performance Auditing System of Public Investment","year":2008,"lang":"en","type":"article","venue":"Cai-mao yanjiu","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PricewaterhouseCoopers (Canada)","funders":"","keywords":"Audit; Investment (military); Generality; Accountability; Business; Performance audit; Accounting; Institution; Generally Accepted Auditing Standards; Public investment; Industrial organization; Economics; Accounting information system; Internal audit; Management; Economic policy; Political science; Joint audit","score_opus":0.03560469856695107,"score_gpt":0.2064313972113797,"score_spread":0.17082669864442865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2373724684","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12427601,0.0004507502,0.8224468,0.0022698,0.00011443779,0.0003099178,0.00024528865,0.00025356634,0.049633387],"genre_scores_gemma":[0.9587461,0.00028376377,0.036964346,0.00005379257,0.00004700757,0.00014973605,0.00008740626,0.00001548802,0.0036524078],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9964289,0.001749027,0.00018880767,0.00054942054,0.0006516284,0.00043216484],"domain_scores_gemma":[0.99738437,0.00095324666,0.00047431712,0.00027866758,0.00071533123,0.00019408306],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025764082,0.0003508247,0.00048543545,0.00095684524,0.0011840696,0.0032448235,0.00084158714,0.00094707886,0.0025807864],"category_scores_gemma":[0.0067575686,0.00033441978,0.00065866887,0.0013593063,0.002036674,0.0037660666,0.0017853796,0.0012890784,0.00025124522],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052768366,0.000033993678,0.0020944786,0.000063508916,0.000021766662,0.00009522441,0.00022344948,0.062615514,0.0010306494,0.91419196,0.001444068,0.018132664],"study_design_scores_gemma":[0.000043607855,0.00008983559,0.0017366342,0.000043149284,0.00003742991,0.00011184869,0.00019069682,0.5062616,0.001612078,0.48340258,0.006421816,0.000048679864],"about_ca_topic_score_codex":0.005619706,"about_ca_topic_score_gemma":0.0022716322,"teacher_disagreement_score":0.005619706,"about_ca_system_score_codex":0.0042489665,"about_ca_system_score_gemma":0.003089241,"threshold_uncertainty_score":0.030828536},"labels":[],"label_agreement":null},{"id":"W2374702432","doi":"","title":"Assessment on Different Schemes of Industrial Structure Adjustment Based on DEA","year":2004,"lang":"en","type":"article","venue":"东北农业大学学报(英文版)","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Science North","funders":"","keywords":"Scheme (mathematics); Field (mathematics); Computer science; Mathematical optimization; Operations research; Industrial engineering; Mathematics; Engineering","score_opus":0.03346977288246894,"score_gpt":0.2755616407422926,"score_spread":0.24209186785982367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2374702432","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29165828,0.00075111655,0.6974079,0.00031688806,0.00004492504,0.00022213809,0.00013196802,0.00014470304,0.009322025],"genre_scores_gemma":[0.9256149,0.0002656749,0.07285877,0.000032163516,0.000010635075,0.00010432155,0.00011544645,0.000017822496,0.0009803645],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969553,0.0016431557,0.00016866197,0.00031924475,0.00071442977,0.00019931012],"domain_scores_gemma":[0.9966108,0.0019575185,0.000375208,0.00031056808,0.00067653286,0.00006944961],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0071433946,0.0008799394,0.0011090228,0.0014786236,0.00053147547,0.0015363336,0.0007342527,0.00092258974,0.0010776427],"category_scores_gemma":[0.011436757,0.00032235662,0.0007974032,0.0016758187,0.0005093179,0.0016251511,0.00085885107,0.0007703475,0.00012704352],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015225203,0.000056354,0.0024906085,0.00008319214,0.000081828905,0.000020589692,0.00004600554,0.9505329,0.0013315175,0.007803665,0.00021838403,0.037182588],"study_design_scores_gemma":[0.000020177633,0.00007518759,0.0010428993,0.000009244418,0.000030752257,0.000010449187,0.000021629012,0.9948323,0.001250105,0.0022894486,0.00040730697,0.000010573135],"about_ca_topic_score_codex":0.0063012796,"about_ca_topic_score_gemma":0.0042873793,"teacher_disagreement_score":0.0071433946,"about_ca_system_score_codex":0.0015427162,"about_ca_system_score_gemma":0.0010132727,"threshold_uncertainty_score":0.037778318},"labels":[],"label_agreement":null},{"id":"W2375344650","doi":"","title":"Method for customer segmentation based on three-way decisions theory","year":2014,"lang":"en","type":"article","venue":"Journal of Computer Applications","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Computer science; Segmentation; Profit (economics); Market segmentation; Decision theory; Decision model; Decision analysis; Artificial intelligence; Decision rule; Data mining; Operations research; Machine learning; Mathematics; Marketing; Business; Statistics","score_opus":0.027330758240421745,"score_gpt":0.32080721953353175,"score_spread":0.29347646129311,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2375344650","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001896374,0.00013196665,0.9948949,0.00013283764,0.000050851773,0.00010403552,0.000033057866,0.00010437997,0.0026515108],"genre_scores_gemma":[0.17851388,0.0004893432,0.81291336,0.0002086469,0.0001298707,0.0006741891,0.00017864071,0.00013797321,0.0067541474],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99366885,0.0025699742,0.00035843597,0.0010300765,0.0019750562,0.0003975994],"domain_scores_gemma":[0.99717534,0.0014412319,0.00018611764,0.00018576867,0.00088509143,0.00012640988],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004146984,0.0010374656,0.0013763275,0.0027871456,0.001600437,0.0029071441,0.0024523267,0.0017330949,0.007787585],"category_scores_gemma":[0.006764171,0.0005852267,0.0025262702,0.0023299286,0.0017232035,0.0033488842,0.002192128,0.002460575,0.0010281398],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018968756,0.00013670379,0.0020605694,0.000573973,0.00018756858,0.00035445046,0.0012042223,0.20065902,0.0046886695,0.54953295,0.0068695936,0.23354252],"study_design_scores_gemma":[0.00006363321,0.000095415504,0.00052489544,0.000080608246,0.000074055126,0.0002380757,0.00023754386,0.8077587,0.002718669,0.17507507,0.013037911,0.000095387484],"about_ca_topic_score_codex":0.004836712,"about_ca_topic_score_gemma":0.0028762235,"teacher_disagreement_score":0.007787585,"about_ca_system_score_codex":0.0029036836,"about_ca_system_score_gemma":0.0035606662,"threshold_uncertainty_score":0.026052058},"labels":[],"label_agreement":null},{"id":"W2376277798","doi":"","title":"Typical cases of foreign electricity enterprise risk management","year":2012,"lang":"en","type":"article","venue":"Electric Power","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Electricity; Enlightenment; Corporate governance; Enterprise risk management; Risk management; Electric power; Electric power industry; China; Industrial organization; Power (physics); Finance; Engineering","score_opus":0.01139603430505452,"score_gpt":0.23791400988682027,"score_spread":0.22651797558176576,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2376277798","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7424263,0.0008278315,0.09006471,0.0035637694,0.00007313272,0.00029445533,0.0003373953,0.0003378678,0.1620746],"genre_scores_gemma":[0.98283696,0.0002476289,0.008554505,0.00005970799,0.00001551039,0.00007236514,0.00008422955,0.000009841176,0.008119337],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9989502,0.00040544997,0.000062142615,0.000088931694,0.0002419513,0.00025129845],"domain_scores_gemma":[0.9992835,0.00030310752,0.00014925175,0.00006949448,0.00009211222,0.000102591934],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011902824,0.0005027405,0.00026884326,0.0011090048,0.0016913167,0.0016215892,0.000621878,0.0019778193,0.0035784217],"category_scores_gemma":[0.0018942127,0.00013348224,0.0005995141,0.0013143134,0.0011094211,0.0012251892,0.0014714244,0.0008262616,0.00022143518],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041081168,0.0004417406,0.053368203,0.00027151982,0.00015981004,0.046079908,0.0077793556,0.27325147,0.004071778,0.5380133,0.016026082,0.060126044],"study_design_scores_gemma":[0.00013780547,0.00035538044,0.026552577,0.00022852415,0.00014836501,0.014595697,0.022821417,0.66118354,0.007400925,0.17895404,0.08742382,0.0001978569],"about_ca_topic_score_codex":0.0071857413,"about_ca_topic_score_gemma":0.0074462825,"teacher_disagreement_score":0.0071857413,"about_ca_system_score_codex":0.0015609168,"about_ca_system_score_gemma":0.00086479814,"threshold_uncertainty_score":0.014287829},"labels":[],"label_agreement":null},{"id":"W2376356042","doi":"","title":"Computation of logistic cost","year":2003,"lang":"en","type":"article","venue":"","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CAE (Canada)","funders":"","keywords":"Logistic regression; Logistic function; Statistics; Mathematics","score_opus":0.0736443587680539,"score_gpt":0.3018344712374177,"score_spread":0.22819011246936377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2376356042","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044951648,0.000973856,0.8432465,0.002200243,0.0004567041,0.00027647006,0.0018008435,0.0005389794,0.10555473],"genre_scores_gemma":[0.619687,0.0020748817,0.32896358,0.00021776304,0.00021077754,0.00054489897,0.002337366,0.00066560344,0.04529812],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906236,0.00021818008,0.000050596314,0.00009623476,0.0004437679,0.00012890191],"domain_scores_gemma":[0.99844545,0.0006919548,0.00012218037,0.00012839904,0.0005403951,0.00007157874],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00086527044,0.00094822235,0.0009315091,0.0023700802,0.0009117372,0.0027961058,0.001211176,0.0010165118,0.02486702],"category_scores_gemma":[0.0077320733,0.00050622923,0.00093979476,0.0023893134,0.0005599273,0.0028829116,0.0012168243,0.0010865125,0.0021509163],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008498406,0.000041297983,0.0027535348,0.00022591528,0.00005700078,0.00028862385,0.00007727149,0.7064522,0.0009304358,0.18377279,0.012506343,0.09280956],"study_design_scores_gemma":[0.00001561156,0.000043367963,0.0022234763,0.000108156724,0.000034344597,0.00025008625,0.00018019804,0.8747598,0.0015341591,0.09514043,0.02566192,0.00004846386],"about_ca_topic_score_codex":0.011899347,"about_ca_topic_score_gemma":0.007057136,"teacher_disagreement_score":0.02486702,"about_ca_system_score_codex":0.0026870945,"about_ca_system_score_gemma":0.002489237,"threshold_uncertainty_score":0.083188474},"labels":[],"label_agreement":null},{"id":"W2376459011","doi":"","title":"The Applications of Non-financial Indicators in Business Assessment","year":2011,"lang":"en","type":"article","venue":"International Business Research","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Performance indicator; Index (typography); Performance measurement; Computer science; Work (physics); Economic indicator; Business; Dimension (graph theory); Finance; Risk analysis (engineering); Process management; Economics; Marketing","score_opus":0.06850522045943094,"score_gpt":0.38969425091615395,"score_spread":0.321189030456723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2376459011","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018308269,0.035347164,0.86692643,0.0052663186,0.001225402,0.00021906823,0.0002660463,0.00024918438,0.0721921],"genre_scores_gemma":[0.6522205,0.037783764,0.2954433,0.0007454777,0.001849019,0.00046774736,0.0003300575,0.00011721552,0.011042986],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99140537,0.0041392273,0.000590317,0.00063180475,0.0029865142,0.00024671966],"domain_scores_gemma":[0.99126107,0.0050443606,0.00096838427,0.000678578,0.0018243428,0.00022321542],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006676991,0.0012943797,0.000890811,0.0043435036,0.0008170716,0.004065231,0.0010971323,0.001205794,0.001840413],"category_scores_gemma":[0.02085017,0.00037825675,0.00084248534,0.007403182,0.0027118023,0.0052637425,0.0023394758,0.0027980744,0.0005938969],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035215893,0.00006582019,0.0043762154,0.0005557587,0.000056205437,0.00013823879,0.0003114701,0.020580802,0.00084827835,0.77287287,0.004483429,0.19567584],"study_design_scores_gemma":[0.00001152188,0.00012372315,0.0055524376,0.0005095174,0.00005352465,0.00031724724,0.0004280445,0.12260854,0.002209361,0.80375326,0.0643264,0.000106441],"about_ca_topic_score_codex":0.0026493904,"about_ca_topic_score_gemma":0.0017138647,"teacher_disagreement_score":0.006676991,"about_ca_system_score_codex":0.0024678737,"about_ca_system_score_gemma":0.0016863934,"threshold_uncertainty_score":0.0353117},"labels":[],"label_agreement":null},{"id":"W2376711778","doi":"","title":"Systemic Risk Measurement of Commercial Banks in China Based on Principal Components Analysis","year":2013,"lang":"en","type":"article","venue":"Journal of Changsha University","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Systemic risk; Listing (finance); Business; Quarter (Canadian coin); Principal component analysis; Principal (computer security); Government (linguistics); Financial crisis; Finance; Economics; Statistics; Computer science; Geography; Mathematics; Computer security","score_opus":0.026829420261432004,"score_gpt":0.20375397852938296,"score_spread":0.17692455826795095,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2376711778","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9977126,0.00007528184,0.0014546363,0.000056632303,0.000002974361,0.000011897795,0.00022755771,0.00001511129,0.00044332477],"genre_scores_gemma":[0.9992366,0.000045658715,0.00034442288,0.0000044443273,0.000003217307,0.000005941045,0.00024942166,6.911238e-7,0.000109649445],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99929833,0.00017620814,0.00007186687,0.00013359456,0.00022892733,0.000091110254],"domain_scores_gemma":[0.99821115,0.00034769622,0.00068310514,0.000103590835,0.000508411,0.00014590577],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010843013,0.00044558122,0.00033146565,0.0022223378,0.00032167044,0.0008174894,0.000253844,0.00028950983,0.0005222669],"category_scores_gemma":[0.0024008616,0.00015667311,0.00035228746,0.0022982978,0.00035714253,0.0006316659,0.00055417477,0.0003063336,0.00009500128],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009568502,0.00006663386,0.9625817,0.00003451721,0.0001225229,0.00017894736,0.0002936482,0.013836404,0.001316532,0.00065388996,0.0008027804,0.020016743],"study_design_scores_gemma":[0.000009086492,0.0000715203,0.9523595,0.000010441666,0.000049276936,0.000055797093,0.0002844546,0.045810144,0.00060524413,0.00044046118,0.00028716415,0.00001697896],"about_ca_topic_score_codex":0.021779591,"about_ca_topic_score_gemma":0.01562459,"teacher_disagreement_score":0.021779591,"about_ca_system_score_codex":0.00078268244,"about_ca_system_score_gemma":0.0010768146,"threshold_uncertainty_score":0.043305635},"labels":[],"label_agreement":null},{"id":"W2376946763","doi":"","title":"Comparison of Construction Standards' Content and Depth Between China and Canada and Its Reference","year":2008,"lang":"en","type":"article","venue":"Advanced materials research","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Technical standard; Point (geometry); Engineering; Key (lock); Construction engineering; Business; Computer science; Political science; Mathematics; Computer security; Law","score_opus":0.18622758654050153,"score_gpt":0.40232418630044614,"score_spread":0.2160965997599446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2376946763","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.505613,0.011217626,0.017394617,0.010113884,0.0004238586,0.00042397864,0.011202514,0.0006999495,0.44291058],"genre_scores_gemma":[0.9568215,0.0032956155,0.00671968,0.00067421823,0.00003231177,0.00006816678,0.0037318706,0.00010629812,0.028550409],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9827899,0.0008691002,0.0006308112,0.0005726316,0.013205253,0.0019323139],"domain_scores_gemma":[0.96643084,0.0024022432,0.0013687308,0.00086826476,0.02790636,0.0010234518],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006094797,0.00032514805,0.00042611404,0.011865023,0.0034160179,0.004198642,0.0014654798,0.00050066767,0.0037744774],"category_scores_gemma":[0.01652634,0.00028966498,0.0005700176,0.0201676,0.0017722913,0.0010940956,0.0013355974,0.00091921946,0.00022717504],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038112863,0.0000974794,0.1548561,0.0014032476,0.00016692824,0.0005894552,0.013250496,0.010451401,0.004080396,0.3262015,0.04989838,0.43862352],"study_design_scores_gemma":[0.000016369766,0.00006706261,0.7056256,0.00056407874,0.0001221277,0.00020996807,0.0084968535,0.0040864144,0.0033415474,0.00537887,0.27194196,0.00014930627],"about_ca_topic_score_codex":0.97158664,"about_ca_topic_score_gemma":0.98150223,"teacher_disagreement_score":0.0912456,"about_ca_system_score_codex":0.0912456,"about_ca_system_score_gemma":0.122583866,"threshold_uncertainty_score":0.6620363},"labels":[],"label_agreement":null},{"id":"W2378141338","doi":"","title":"Improved Model of Delay and Measurement Analysis at Signalized Intersection","year":2015,"lang":"en","type":"article","venue":"Guangxi kexue","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Intersection (aeronautics); Computer science; Retard; Control theory (sociology); Simulation; Control (management); Transport engineering; Engineering; Artificial intelligence","score_opus":0.08386875653562127,"score_gpt":0.25496069493917756,"score_spread":0.1710919384035563,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2378141338","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06605036,0.00033986362,0.9225955,0.00027433844,0.00006110243,0.00006126902,0.00035384,0.00041546358,0.0098483255],"genre_scores_gemma":[0.972121,0.00033422903,0.017265452,0.00003733611,0.000027322143,0.00010989612,0.00029211878,0.000054537224,0.009758159],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99924576,0.00015706373,0.000034107576,0.00022552517,0.00019566517,0.00014186453],"domain_scores_gemma":[0.99938905,0.00017924524,0.00008244884,0.000040744548,0.0002832378,0.000025365445],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00072927115,0.0009648541,0.0007419717,0.00071344344,0.00048433544,0.0010322321,0.0016127019,0.0009831496,0.002762883],"category_scores_gemma":[0.0014382695,0.00044432638,0.0010031746,0.0007847344,0.00055308617,0.0013980031,0.0008465806,0.0010560397,0.0004037636],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002983607,0.000013711281,0.00074426574,0.000028971359,0.000010669693,0.000040269653,0.00003279449,0.989317,0.0009896801,0.0045672595,0.0002671321,0.003958473],"study_design_scores_gemma":[0.0000025980703,0.000008771365,0.00015147055,0.0000015594198,0.0000058549813,0.0000068039944,0.0000043299706,0.99876106,0.00024691297,0.000602485,0.00020344605,0.00000469926],"about_ca_topic_score_codex":0.035272054,"about_ca_topic_score_gemma":0.010190698,"teacher_disagreement_score":0.035272054,"about_ca_system_score_codex":0.0019699568,"about_ca_system_score_gemma":0.0017201533,"threshold_uncertainty_score":0.07013351},"labels":[],"label_agreement":null},{"id":"W2379156659","doi":"","title":"Comparison and Reference of Project Cost Management between China and Canada","year":2006,"lang":"en","type":"article","venue":"Advanced materials research","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Christian ministry; Valuation (finance); Economic shortage; Project management; Business; Norm (philosophy); Earned value management; Operations management; Environmental economics; Project management triangle; Engineering management; Operations research; Engineering; Finance; Economics; OPM3; Political science; Management","score_opus":0.09107145620944378,"score_gpt":0.39832337618344515,"score_spread":0.30725191997400136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2379156659","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8789534,0.0059274714,0.005479678,0.0034750262,0.00016021596,0.00010962267,0.0030640895,0.00019370906,0.10263679],"genre_scores_gemma":[0.99255085,0.0010022494,0.0014867587,0.0001025638,0.0000074600275,0.000017529052,0.001087559,0.000025278572,0.0037197482],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99508935,0.00058344303,0.00020487049,0.00028426285,0.0028290993,0.0010090206],"domain_scores_gemma":[0.99323446,0.00048097255,0.0003763044,0.00027996322,0.0051982105,0.0004300799],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026485906,0.00025357938,0.00044938351,0.0035256913,0.0012390115,0.0023243022,0.0012694643,0.0003083645,0.0016068546],"category_scores_gemma":[0.007972397,0.00014898772,0.00045400223,0.008040711,0.0005924956,0.0008852986,0.0008007781,0.00050387107,0.00010113216],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015152405,0.00023859843,0.34965804,0.00082562695,0.00042145702,0.0012276901,0.003830947,0.10241966,0.002780529,0.13550769,0.04131124,0.36026332],"study_design_scores_gemma":[0.00006555543,0.00024449284,0.8595065,0.00023220995,0.0001740634,0.00021022541,0.0062421355,0.05455363,0.0031688903,0.0029609578,0.07248614,0.00015520753],"about_ca_topic_score_codex":0.956713,"about_ca_topic_score_gemma":0.9673186,"teacher_disagreement_score":0.049670067,"about_ca_system_score_codex":0.049670067,"about_ca_system_score_gemma":0.03871375,"threshold_uncertainty_score":0.36038327},"labels":[],"label_agreement":null},{"id":"W2379944106","doi":"","title":"Comparative Analysis of Value at Risk of Securities Market of China and U.S.","year":2007,"lang":"en","type":"article","venue":"Xuexi yu tansuo","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Market risk; Value at risk; Quarter (Canadian coin); China; Market value; Stock exchange; Index (typography); Stock market; Financial economics; Value (mathematics); Business; Financial risk; Actuarial science; Stock market index; Economics; Risk management; Finance; Statistics; Mathematics; Political science; Geography","score_opus":0.013187926086984013,"score_gpt":0.26391454942509757,"score_spread":0.2507266233381136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2379944106","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9772486,0.0023302247,0.0076706167,0.00071513356,0.000030984753,0.000024192906,0.0007418907,0.000072645445,0.011165798],"genre_scores_gemma":[0.9976265,0.0003466872,0.00061724335,0.000018415729,0.00001279901,0.000008673376,0.00048159406,0.0000073267097,0.0008805965],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993131,0.00011860369,0.000038195638,0.00009523932,0.00030619247,0.0001285956],"domain_scores_gemma":[0.9983706,0.00064238004,0.00036354858,0.00008367799,0.00039055772,0.00014922734],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012940298,0.000290274,0.00039917408,0.0019150858,0.00027207704,0.0014241997,0.0003890759,0.00035111443,0.0017737758],"category_scores_gemma":[0.0044854498,0.00014089947,0.0006830667,0.0014688483,0.0003081541,0.0014648743,0.0005005417,0.00033360143,0.00013696658],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00094774785,0.0001757098,0.40048748,0.00031660963,0.000590277,0.0010971443,0.0005959691,0.40290332,0.002956253,0.08374018,0.010753887,0.09543536],"study_design_scores_gemma":[0.000039780745,0.00019037245,0.27035084,0.00003555932,0.00012630026,0.00034029505,0.0003199605,0.7068459,0.0013589038,0.016233617,0.004099912,0.000058583923],"about_ca_topic_score_codex":0.019079978,"about_ca_topic_score_gemma":0.012416012,"teacher_disagreement_score":0.019079978,"about_ca_system_score_codex":0.0022154567,"about_ca_system_score_gemma":0.0011870057,"threshold_uncertainty_score":0.03793788},"labels":[],"label_agreement":null},{"id":"W2382173177","doi":"","title":"Research on the EVA Integrated BSC Performance Measure System Based on Maximizing the Company Value","year":2013,"lang":"en","type":"article","venue":"International Business Research","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Balanced scorecard; Economic Value Added; Measure (data warehouse); Analytic hierarchy process; Value (mathematics); Computer science; Performance measurement; Business; Process management; Operations research; Mathematics; Profit (economics); Marketing; Economics; Data mining","score_opus":0.1673384713261493,"score_gpt":0.3711638417152798,"score_spread":0.20382537038913048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2382173177","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16052304,0.001610515,0.7983893,0.001123116,0.00015980512,0.0007162549,0.00031453316,0.00062082,0.036542535],"genre_scores_gemma":[0.83972645,0.00052904664,0.15664858,0.0000790708,0.000052579806,0.0003050027,0.00040327452,0.000042349428,0.0022137105],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9920184,0.0025979902,0.00052600814,0.0006683995,0.0038769972,0.0003122061],"domain_scores_gemma":[0.9947509,0.0013188132,0.0006820394,0.0002829571,0.0027931645,0.00017210911],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0062396205,0.0009545557,0.0008985076,0.003757516,0.00069411227,0.003812434,0.00097093906,0.0007269955,0.0013785294],"category_scores_gemma":[0.009943312,0.00029914227,0.0005845677,0.0049742223,0.00069967017,0.0030116215,0.0014224775,0.0010196693,0.000312578],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034399587,0.00060580176,0.025664283,0.0007104123,0.00040657024,0.00012156515,0.0007814353,0.19208346,0.016475964,0.086748555,0.004259176,0.6717988],"study_design_scores_gemma":[0.00006589886,0.00093317317,0.024547664,0.00028560258,0.00019889334,0.00017232116,0.0010004024,0.9158336,0.01683412,0.025875214,0.014114598,0.0001385379],"about_ca_topic_score_codex":0.0045293537,"about_ca_topic_score_gemma":0.003094544,"teacher_disagreement_score":0.0062396205,"about_ca_system_score_codex":0.0032062572,"about_ca_system_score_gemma":0.0033679039,"threshold_uncertainty_score":0.03299868},"labels":[],"label_agreement":null},{"id":"W2382411623","doi":"","title":"Analysis on the Implementation Effectiveness of Canada Standardization Strategy between the Years of 2008 to 2009","year":2010,"lang":"en","type":"article","venue":"Standard Science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Standardization; Certification; Accreditation; Work (physics); Engineering management; Business; Process management; Engineering; Political science; Medicine; Medical education","score_opus":0.01228860907689592,"score_gpt":0.30222598301179737,"score_spread":0.28993737393490143,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2382411623","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89550984,0.0028620763,0.0014330519,0.01081171,0.00014460782,0.0002816985,0.007268887,0.00014239237,0.08154556],"genre_scores_gemma":[0.98600334,0.00065056665,0.0006404506,0.00053914584,0.000013279598,0.000051903247,0.002500018,0.000023500215,0.009577843],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98687625,0.0009907519,0.0004749225,0.0007025848,0.007772052,0.0031834415],"domain_scores_gemma":[0.94795644,0.004866848,0.0039204597,0.0008932835,0.03873489,0.0036279752],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007899171,0.00027282385,0.00049408677,0.002778991,0.003274428,0.0038046858,0.0018426452,0.0007614198,0.002738046],"category_scores_gemma":[0.037062123,0.00024478484,0.00065666786,0.0068730316,0.0012734485,0.0011851229,0.0011978706,0.0016959688,0.0002782094],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00066483446,0.0003611169,0.7300825,0.00038326616,0.00043436102,0.00035135946,0.006353588,0.010985017,0.0011635155,0.027427543,0.044298276,0.17749462],"study_design_scores_gemma":[0.00003458274,0.00012158355,0.9526409,0.00011079708,0.00015233175,0.00004006483,0.0061529255,0.0040936456,0.00090854167,0.00033833267,0.035348024,0.00005833648],"about_ca_topic_score_codex":0.9937848,"about_ca_topic_score_gemma":0.99415755,"teacher_disagreement_score":0.8847402,"about_ca_system_score_codex":0.11525983,"about_ca_system_score_gemma":0.16417573,"threshold_uncertainty_score":0.83627254},"labels":[],"label_agreement":null},{"id":"W2382903032","doi":"","title":"Close-Degree Study of Unsafe Event Ratio for Airlines","year":2011,"lang":"en","type":"article","venue":"Journal of Civil Aviation University of China","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Degree (music); Comparability; Mathematics; Statistics; Geography; Combinatorics; Physics","score_opus":0.04085605987665546,"score_gpt":0.23364030982329387,"score_spread":0.1927842499466384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2382903032","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90205246,0.00069819327,0.09089746,0.00018199468,0.000036999714,0.000028107717,0.00026613564,0.000048431553,0.005790189],"genre_scores_gemma":[0.9973822,0.000073591655,0.0022197585,0.0000049025252,0.000009621151,0.0000043178156,0.0000725907,0.0000035060568,0.00022952577],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99859935,0.0003027842,0.00012179759,0.00034903316,0.0004574299,0.00016961328],"domain_scores_gemma":[0.9959682,0.001813004,0.00084956444,0.00034477128,0.0006958848,0.00032847628],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012558493,0.000316382,0.00038616426,0.0025106897,0.0006537629,0.0011370368,0.0005821996,0.00051671534,0.0019376258],"category_scores_gemma":[0.008716303,0.00015085941,0.0007952554,0.0015880723,0.0006668634,0.0023837278,0.0009347283,0.0005478648,0.00013330352],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006641348,0.0002175112,0.4724951,0.00036609263,0.00049199816,0.0008790297,0.0016538672,0.3598652,0.007373289,0.06431753,0.0016400344,0.09003631],"study_design_scores_gemma":[0.000022548254,0.0005676391,0.306113,0.00004955526,0.00012279266,0.0016790186,0.0024432547,0.6410116,0.005270373,0.03801321,0.0045904443,0.00011656226],"about_ca_topic_score_codex":0.003458181,"about_ca_topic_score_gemma":0.0019569527,"teacher_disagreement_score":0.003458181,"about_ca_system_score_codex":0.00074112124,"about_ca_system_score_gemma":0.0002866381,"threshold_uncertainty_score":0.006876111},"labels":[],"label_agreement":null},{"id":"W2384299624","doi":"","title":"Study on Evaluation Index System of Railway Industry Safety Production","year":2015,"lang":"en","type":"article","venue":"Railway Transport and Economy","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Index (typography); Transport engineering; Engineering; Hazard; Evaluation methods; Hazard analysis; China; Production (economics); System safety; Risk analysis (engineering); Business; Reliability engineering; Computer science","score_opus":0.05131277287786833,"score_gpt":0.2624909555195012,"score_spread":0.21117818264163285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2384299624","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.230827,0.0021499225,0.7122504,0.0008413403,0.00019381587,0.00037860635,0.00051839976,0.0005077615,0.05233278],"genre_scores_gemma":[0.9112658,0.00088507845,0.08103594,0.00005647858,0.000091602305,0.00035188167,0.0006033495,0.00007119069,0.0056387438],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99591124,0.0013805359,0.00031056773,0.0005898963,0.0015408498,0.00026682427],"domain_scores_gemma":[0.9969112,0.0011113936,0.0002254158,0.00018583269,0.0014581425,0.000107936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0050010644,0.000689601,0.0006477414,0.0033453896,0.00087047153,0.0034859627,0.00093026384,0.00072580285,0.0028605775],"category_scores_gemma":[0.010557694,0.0002771922,0.0008295307,0.0037605944,0.0008818633,0.0036537831,0.00084096787,0.00089051935,0.0004156683],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037050748,0.00031225695,0.04580862,0.0009467188,0.00023425458,0.00034319697,0.0020002702,0.22754548,0.0148142055,0.30579677,0.015359482,0.3864682],"study_design_scores_gemma":[0.000047504436,0.00034861563,0.022743272,0.00012797974,0.00010707598,0.00028313775,0.0010189845,0.89684206,0.005991415,0.05956847,0.012810778,0.00011074328],"about_ca_topic_score_codex":0.006858251,"about_ca_topic_score_gemma":0.0025869787,"teacher_disagreement_score":0.006858251,"about_ca_system_score_codex":0.0025745463,"about_ca_system_score_gemma":0.0020966968,"threshold_uncertainty_score":0.026448488},"labels":[],"label_agreement":null},{"id":"W2384753111","doi":"","title":"An Analysis of Commercial Banks′ Operational Risk Based on Panel Data Model","year":2011,"lang":"en","type":"article","venue":"Commercial Research","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Operational risk; Business; Quarter (Canadian coin); Panel data; Volatility (finance); Risk management; Profit (economics); China; Commercial bank; Finance; Actuarial science; Economics; Econometrics","score_opus":0.5805933291952883,"score_gpt":0.46348283569232723,"score_spread":0.11711049350296104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2384753111","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8594277,0.0009563138,0.12860264,0.0015995026,0.000059504917,0.00010305677,0.0028773989,0.0002045397,0.0061693527],"genre_scores_gemma":[0.9922471,0.00037212615,0.0038437154,0.00005312645,0.000027088674,0.000050546467,0.0011348161,0.000011445523,0.002260039],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990896,0.00042043623,0.000035606306,0.00017847591,0.00008438126,0.00019158867],"domain_scores_gemma":[0.99600714,0.0027913747,0.00054406095,0.00018073407,0.0003220861,0.00015466938],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028308157,0.0006183553,0.0008627101,0.00071291707,0.00040139724,0.0014261425,0.0009545757,0.0009422887,0.002686645],"category_scores_gemma":[0.00418283,0.00041280655,0.0012965279,0.00092797267,0.00039393088,0.0012859243,0.0006922837,0.0015363562,0.00028129315],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014434331,0.00013502427,0.040951166,0.000061144805,0.00027390267,0.00032674894,0.00010273378,0.93131804,0.00036913212,0.013657057,0.0024482694,0.010212385],"study_design_scores_gemma":[0.0000074585614,0.000039255818,0.007261198,0.0000067684414,0.000052779906,0.000022068532,0.000044208322,0.989716,0.00008616284,0.002452754,0.0002977863,0.000013576025],"about_ca_topic_score_codex":0.029855857,"about_ca_topic_score_gemma":0.011843802,"teacher_disagreement_score":0.029855857,"about_ca_system_score_codex":0.0013051349,"about_ca_system_score_gemma":0.00076772645,"threshold_uncertainty_score":0.05936414},"labels":[],"label_agreement":null},{"id":"W2386417845","doi":"","title":"FINANCIAL RISK ASSESSMENT OF OVERSEAS MINING INVESTMENT BASED ON GRA AND TOPSIS","year":2015,"lang":"en","type":"article","venue":"Resources and Industries","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"TOPSIS; Business; Financial risk; Delphi method; Finance; Investment (military); Identification (biology); Delphi; Index (typography); Economics; Political science; Computer science","score_opus":0.040938603462047446,"score_gpt":0.262529519528345,"score_spread":0.22159091606629758,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2386417845","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66029876,0.00094501325,0.3089233,0.0009990634,0.00006922563,0.0005615033,0.0005090385,0.00027288994,0.027421163],"genre_scores_gemma":[0.9709443,0.0003330827,0.027474824,0.000023285085,0.000009241989,0.00011778467,0.00016724906,0.000007215784,0.0009230097],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99572855,0.0019522234,0.00029514727,0.00022730301,0.0015656574,0.00023111977],"domain_scores_gemma":[0.9971566,0.0013604573,0.00047723058,0.00009812495,0.0008126962,0.000094792114],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036566535,0.0010311361,0.0006180539,0.004683669,0.0005985359,0.0028574755,0.00067411765,0.00052023254,0.0017982962],"category_scores_gemma":[0.0063312077,0.00021228637,0.0011625744,0.0032357464,0.0005563667,0.0016229276,0.0012353802,0.00057946343,0.0001924164],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005852776,0.00032194832,0.111347,0.00089661387,0.001103039,0.0011649475,0.002782533,0.46685514,0.00579557,0.05263618,0.0033150492,0.3531967],"study_design_scores_gemma":[0.00002842595,0.0005491735,0.029584935,0.00021364872,0.00023217284,0.0005141253,0.003052802,0.92274874,0.0018984532,0.038292132,0.0027708327,0.00011464466],"about_ca_topic_score_codex":0.0031058355,"about_ca_topic_score_gemma":0.0031366975,"teacher_disagreement_score":0.004683669,"about_ca_system_score_codex":0.0016206137,"about_ca_system_score_gemma":0.0013078176,"threshold_uncertainty_score":0.019338489},"labels":[],"label_agreement":null},{"id":"W2388442432","doi":"","title":"Application of Monte Carlo Simulation on Germplasm Resource Research","year":2009,"lang":"en","type":"article","venue":"Seed","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Germplasm; Monte Carlo method; Resource (disambiguation); Computer science; Statistical physics; Environmental science; Physics; Mathematics; Biology; Agronomy; Statistics; Computer network","score_opus":0.05499177993192052,"score_gpt":0.3512780708869377,"score_spread":0.2962862909550172,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2388442432","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09339052,0.0006995987,0.89072096,0.00056307844,0.00007111164,0.00013458554,0.00012702239,0.00030132468,0.013991806],"genre_scores_gemma":[0.84593546,0.00046042097,0.15035969,0.000098222525,0.00003195077,0.00024947405,0.00012225204,0.000104515064,0.0026380967],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987845,0.000871426,0.000032380845,0.00007777873,0.00018550643,0.000048443544],"domain_scores_gemma":[0.98936313,0.009461177,0.00026881954,0.0003349609,0.00046705324,0.00010487253],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003325627,0.0005372505,0.0011073712,0.0010957828,0.0006317614,0.0013422858,0.001044568,0.0015980889,0.0022794716],"category_scores_gemma":[0.011052593,0.0007579857,0.0006795258,0.0012460682,0.00076091057,0.0010256143,0.0005578827,0.0008439099,0.00021312007],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010049605,0.000012700184,0.0001984367,0.000008285569,0.000008517318,0.000009485376,0.000006077736,0.9934634,0.00008619496,0.0040553445,0.00005777184,0.0020837372],"study_design_scores_gemma":[0.0000031334184,0.0000043482887,0.00003253286,0.0000020606806,0.0000027197768,0.0000032168914,0.0000018831672,0.9976432,0.0000770272,0.0021171253,0.00011098266,0.0000018202463],"about_ca_topic_score_codex":0.013750388,"about_ca_topic_score_gemma":0.0107596135,"teacher_disagreement_score":0.013750388,"about_ca_system_score_codex":0.0017757727,"about_ca_system_score_gemma":0.0017672282,"threshold_uncertainty_score":0.02734065},"labels":[],"label_agreement":null},{"id":"W2388844498","doi":"","title":"Analysis and research of Shandong province transportation services evaluation system","year":2014,"lang":"en","type":"article","venue":"山东交通科技","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Structural equation modeling; Transport engineering; Quarter (Canadian coin); Public transport; Service (business); Chart; Research Object; Business; Service system; Marketing; Regional science; Computer science; Geography; Engineering; Statistics","score_opus":0.0381546620943766,"score_gpt":0.324852963134656,"score_spread":0.2866983010402794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2388844498","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9630312,0.00025047894,0.017200481,0.0007198191,0.000024139066,0.00056016434,0.0017500288,0.00016408194,0.016299631],"genre_scores_gemma":[0.9910603,0.00016157803,0.005432079,0.000020606267,0.0000043625773,0.00032578458,0.0012378374,0.000006961972,0.0017504281],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99586344,0.0014886063,0.00037821333,0.00032990586,0.0015510946,0.00038864554],"domain_scores_gemma":[0.9962716,0.0007791444,0.00033914423,0.00011658506,0.0022703207,0.00022309729],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0049374276,0.0004470812,0.00038115706,0.0034452707,0.00091519294,0.0019011147,0.0005323721,0.00024763652,0.0023419922],"category_scores_gemma":[0.006649785,0.00021605322,0.00076885615,0.0062714387,0.00043688732,0.0011208956,0.00093332713,0.0004201062,0.00025750877],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029415442,0.0005398718,0.70997995,0.00066631933,0.00021273179,0.00023414448,0.0051682536,0.02354575,0.0024003345,0.01852686,0.010555913,0.22787566],"study_design_scores_gemma":[0.00006976019,0.00057289505,0.70367783,0.0001911277,0.00023764143,0.00016858197,0.011926354,0.26061693,0.0038480444,0.0034525667,0.015149627,0.00008876125],"about_ca_topic_score_codex":0.111878596,"about_ca_topic_score_gemma":0.06555709,"teacher_disagreement_score":0.111878596,"about_ca_system_score_codex":0.008285786,"about_ca_system_score_gemma":0.011703192,"threshold_uncertainty_score":0.22245479},"labels":[],"label_agreement":null},{"id":"W2389366180","doi":"","title":"Fuzzy Comprehensive Evaluation on Quality of Engineering Construction","year":2000,"lang":"en","type":"article","venue":"","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CAE (Canada)","funders":"","keywords":"Quality (philosophy); Fuzzy logic; Modernization theory; Engineering; Fuzzy mathematics; Foundation (evidence); Construction engineering; Management science; Engineering management; Computer science; Fuzzy set; Systems engineering; Artificial intelligence; Fuzzy number; Geography; Economics","score_opus":0.05871011271750788,"score_gpt":0.308160873745992,"score_spread":0.24945076102848412,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2389366180","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.124139994,0.004472416,0.8349497,0.0008793147,0.000084967505,0.000070926966,0.00018787297,0.00019161258,0.035023138],"genre_scores_gemma":[0.9685675,0.0010320664,0.02813143,0.000030453206,0.00003718073,0.000033058757,0.00008554573,0.000012687257,0.002070035],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99688405,0.00075682823,0.00012070189,0.00021711945,0.0018743402,0.00014690055],"domain_scores_gemma":[0.99876416,0.00031082417,0.00014002182,0.00008697428,0.00061849435,0.00007951487],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021101928,0.00046667166,0.0005041881,0.002983263,0.0004782895,0.0019268714,0.0004825012,0.00040359673,0.0011415672],"category_scores_gemma":[0.004574672,0.00013450207,0.00056893774,0.0022368599,0.0008993959,0.001985695,0.0009567427,0.0003330364,0.000087347355],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013632486,0.0000813842,0.00798394,0.00061041233,0.0002506959,0.00017169658,0.0009618605,0.29047844,0.009457187,0.4509133,0.0048909676,0.23406379],"study_design_scores_gemma":[0.000029021481,0.00024237984,0.012511118,0.00015216555,0.00019229807,0.0002240491,0.0004664717,0.7841977,0.0053279577,0.18141901,0.015108327,0.00012952778],"about_ca_topic_score_codex":0.0051192148,"about_ca_topic_score_gemma":0.0053129587,"teacher_disagreement_score":0.0051192148,"about_ca_system_score_codex":0.0022678291,"about_ca_system_score_gemma":0.0012758815,"threshold_uncertainty_score":0.01645428},"labels":[],"label_agreement":null},{"id":"W2390331158","doi":"","title":"Investment time delay and investment model with time delay","year":2001,"lang":"en","type":"article","venue":"Xinyang Shifan Xueyuan xuebao. Ziran kexueban","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Discovery Air (Canada)","funders":"","keywords":"Investment (military); Business; Economics; Monetary economics","score_opus":0.014976603220546348,"score_gpt":0.21602436106025144,"score_spread":0.2010477578397051,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2390331158","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10095088,0.0024666141,0.84703845,0.002790065,0.00040785683,0.00008776864,0.00065621454,0.00020171823,0.04540045],"genre_scores_gemma":[0.93695986,0.0018614496,0.013673783,0.00010565721,0.000114445065,0.00012805889,0.0002191428,0.000032473974,0.046905186],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994505,0.00010886096,0.000025395495,0.00014411601,0.0001306572,0.00014039679],"domain_scores_gemma":[0.9993093,0.00031137187,0.00015097394,0.00003756032,0.00011619615,0.00007462827],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094836054,0.00077642396,0.0006160361,0.0004995181,0.0003542801,0.0015216774,0.0012674895,0.0013081664,0.006942773],"category_scores_gemma":[0.0035451371,0.00034214582,0.0005868563,0.00073442765,0.0009304264,0.0027735615,0.0006413614,0.0013308858,0.0004892264],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000067933324,0.000021658772,0.0007140573,0.000112456495,0.000022428238,0.00023621175,0.00009827477,0.55148673,0.0012315181,0.43823114,0.0015510259,0.0062264823],"study_design_scores_gemma":[0.000027839073,0.000058069163,0.00039819186,0.000015450023,0.000028864115,0.00008884052,0.000036920228,0.89660627,0.00035617416,0.09903368,0.0033296964,0.00002005003],"about_ca_topic_score_codex":0.0058412147,"about_ca_topic_score_gemma":0.0025678216,"teacher_disagreement_score":0.006942773,"about_ca_system_score_codex":0.0020908057,"about_ca_system_score_gemma":0.0012036837,"threshold_uncertainty_score":0.023225904},"labels":[],"label_agreement":null},{"id":"W2390571397","doi":"","title":"Construction of Supporting System for Technical Materials Procurement of University with Multi-campus","year":2004,"lang":"en","type":"article","venue":"Research and Exploration in Laboratory","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"L'Alliance Boviteq","funders":"","keywords":"Engineering; Engineering management; Construction engineering; Procurement; Architectural engineering; Civil engineering; Business","score_opus":0.06392454041446911,"score_gpt":0.3230048365973015,"score_spread":0.2590802961828324,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2390571397","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5399821,0.00033511125,0.43215662,0.0005778481,0.00014380374,0.00055777386,0.00041627625,0.0026493093,0.02318126],"genre_scores_gemma":[0.91253614,0.00020493717,0.08185871,0.000033233177,0.00003270269,0.00029189067,0.00048224514,0.000059809856,0.004500379],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99890697,0.00030021998,0.00007626973,0.00013702064,0.0003853052,0.00019421424],"domain_scores_gemma":[0.99854505,0.00027889528,0.00014807215,0.0002578096,0.00058351434,0.00018664633],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011891796,0.00052234775,0.0004897047,0.0014915073,0.001365199,0.0016887544,0.0010049897,0.00065479235,0.007843359],"category_scores_gemma":[0.00269891,0.00032465893,0.00051003863,0.0011718057,0.00031966987,0.0018886934,0.0013013249,0.00036970715,0.0010563784],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014709565,0.00088981626,0.053267162,0.000924802,0.00016053417,0.0014528171,0.0016720373,0.16641562,0.07976502,0.06746169,0.016494058,0.6100255],"study_design_scores_gemma":[0.0003361419,0.0015617604,0.033684373,0.00023068284,0.00035146598,0.0015204798,0.002999168,0.76569426,0.1104833,0.018683003,0.06422764,0.00022774127],"about_ca_topic_score_codex":0.0031315847,"about_ca_topic_score_gemma":0.0021729812,"teacher_disagreement_score":0.007843359,"about_ca_system_score_codex":0.0009043399,"about_ca_system_score_gemma":0.002653105,"threshold_uncertainty_score":0.02623862},"labels":[],"label_agreement":null},{"id":"W2390727504","doi":"","title":"Application of Equal Risk Curve to Risk Assessment of Engnerring Projects","year":2007,"lang":"en","type":"article","venue":"Journal of Southwest University","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Risk assessment; Investment (military); Risk analysis (engineering); Business; Actuarial science; Computer science; Geography; Political science; Computer security","score_opus":0.015183418644579281,"score_gpt":0.2593671690207899,"score_spread":0.2441837503762106,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2390727504","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038479056,0.00086668413,0.95007807,0.00036700186,0.000045714227,0.00007037375,0.0000778365,0.0001543444,0.009860958],"genre_scores_gemma":[0.9082908,0.0012649675,0.085279904,0.00008257257,0.00006596577,0.00013840193,0.00015080532,0.00011193132,0.004614636],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9938366,0.0027699647,0.0002599255,0.0005887059,0.0019821,0.00056273636],"domain_scores_gemma":[0.992677,0.003999532,0.00070924975,0.00062937103,0.0016050645,0.0003796451],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0065394416,0.0012936353,0.001407626,0.0041369963,0.0007951773,0.0025196103,0.0019271326,0.001398352,0.003068728],"category_scores_gemma":[0.019771928,0.00047950924,0.0016134806,0.0021236541,0.0019180522,0.0038762433,0.0034176218,0.0017874645,0.00034005617],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006513976,0.000036840698,0.0039902125,0.0001016955,0.00007968481,0.0002174751,0.00024061743,0.7921702,0.00060441566,0.14982721,0.00091213913,0.051754303],"study_design_scores_gemma":[0.000008984819,0.0001058777,0.0015738764,0.000047469628,0.000034383622,0.00018385131,0.0001388451,0.84718496,0.0008895629,0.14623415,0.0035446854,0.00005336721],"about_ca_topic_score_codex":0.0049810195,"about_ca_topic_score_gemma":0.0022048214,"teacher_disagreement_score":0.0065394416,"about_ca_system_score_codex":0.0024747977,"about_ca_system_score_gemma":0.0017103521,"threshold_uncertainty_score":0.034584343},"labels":[],"label_agreement":null},{"id":"W2391251002","doi":"","title":"Construction Site Security Capital Investment Evaluation Model and Its Application","year":2010,"lang":"en","type":"article","venue":"Journal of Shenyang Jianzhu University","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"","keywords":"Investment (military); Function (biology); Capital (architecture); Return on investment; Capital budgeting; Risk analysis (engineering); Process (computing); Business; Finance; Operations research; Actuarial science; Computer science; Engineering; Economics; Microeconomics; Production (economics)","score_opus":0.009889336049000637,"score_gpt":0.21039146969167039,"score_spread":0.20050213364266975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2391251002","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06973821,0.00042685156,0.90187865,0.000827718,0.000045934645,0.0002304895,0.0003772553,0.00033244214,0.026142403],"genre_scores_gemma":[0.9456437,0.00040102232,0.04308393,0.000048384445,0.000022123324,0.00048332795,0.00030455465,0.000039113664,0.009973857],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99847585,0.0006357514,0.000069874426,0.00023370505,0.00043087915,0.0001539098],"domain_scores_gemma":[0.99897707,0.00047495493,0.00008685173,0.000045788693,0.00036801246,0.00004746762],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021950253,0.00088439015,0.0007185253,0.0010692811,0.00037426737,0.0017624049,0.0012894892,0.0010321538,0.003561485],"category_scores_gemma":[0.003779887,0.00036442382,0.00073631905,0.0014380232,0.0005096486,0.0014158869,0.00072092086,0.0009024535,0.0004244992],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044557546,0.000046468096,0.0017971108,0.00005275996,0.00003003315,0.00007417909,0.000069015165,0.9530328,0.0004025863,0.025875311,0.0013374584,0.017237734],"study_design_scores_gemma":[0.000005185387,0.000020721838,0.0003774388,0.0000067097244,0.000007409747,0.0000145047725,0.00001702662,0.9930031,0.00019966053,0.005829841,0.0005115091,0.000007045216],"about_ca_topic_score_codex":0.012590496,"about_ca_topic_score_gemma":0.006527065,"teacher_disagreement_score":0.012590496,"about_ca_system_score_codex":0.0029706457,"about_ca_system_score_gemma":0.0020406127,"threshold_uncertainty_score":0.025034428},"labels":[],"label_agreement":null},{"id":"W2391883001","doi":"","title":"Benefit Calculation of Asphalt Concrete Pavement Preventive Maintenance and Parameters","year":2006,"lang":"en","type":"article","venue":"Highway","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Preventive maintenance; Planned maintenance; Engineering; Transport engineering; Risk analysis (engineering); Forensic engineering; Reliability engineering; Business","score_opus":0.011181633064080583,"score_gpt":0.21977252027100835,"score_spread":0.20859088720692778,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2391883001","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17141075,0.0006288688,0.81136143,0.00017411073,0.000031731364,0.00008405173,0.00022007475,0.00030062872,0.015788421],"genre_scores_gemma":[0.9517021,0.00017080586,0.044994757,0.000010275656,0.000010462587,0.00005490857,0.00012651895,0.000031072228,0.0028991713],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994351,0.00011762685,0.000014282091,0.000051939478,0.00032837878,0.00005268179],"domain_scores_gemma":[0.9992993,0.00035874368,0.00007331695,0.000068980735,0.00017830239,0.000021389422],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007320012,0.00039971786,0.00039020227,0.00089052366,0.0002251384,0.0006164849,0.00049697305,0.00045108268,0.001613562],"category_scores_gemma":[0.0029560104,0.00017296149,0.00036951495,0.0006037695,0.00029323582,0.00075328967,0.00038930535,0.00040253167,0.0002448892],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012787999,0.000048233862,0.0036920165,0.00011327897,0.000027538077,0.00008679372,0.00006788624,0.8790448,0.0065240595,0.029904261,0.0011214073,0.079241864],"study_design_scores_gemma":[0.0000048214856,0.00006340719,0.0034727547,0.000010300461,0.00002141129,0.00008145753,0.000033127522,0.97728366,0.004952353,0.011927871,0.0021343238,0.000014680243],"about_ca_topic_score_codex":0.0029876572,"about_ca_topic_score_gemma":0.0028904455,"teacher_disagreement_score":0.0029876572,"about_ca_system_score_codex":0.0007038621,"about_ca_system_score_gemma":0.00079058367,"threshold_uncertainty_score":0.005940497},"labels":[],"label_agreement":null},{"id":"W2393131975","doi":"","title":"The Risk Preference of Medium and Small Investors under the Different Market Condition","year":2009,"lang":"en","type":"article","venue":"International Business Research","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Preference; Risk aversion (psychology); Loss aversion; Prospect theory; Risk-seeking; Economics; Expected utility hypothesis; Business; Microeconomics; Financial economics; Finance","score_opus":0.10977051342313257,"score_gpt":0.34788020356781546,"score_spread":0.2381096901446829,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2393131975","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9878006,0.00020552531,0.004558461,0.00024471854,0.00001196586,0.000021230262,0.000051589363,0.0000063037132,0.007099599],"genre_scores_gemma":[0.99868053,0.00006285726,0.000400525,0.000023546512,0.000008870252,0.0000075040584,0.00002265781,8.824281e-7,0.0007925235],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994667,0.00015862606,0.000040701765,0.00006767826,0.00015371312,0.0001125354],"domain_scores_gemma":[0.99784267,0.0009186399,0.000503007,0.00014413727,0.00024427602,0.000347119],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015268866,0.00018930597,0.00020799391,0.0003620716,0.00020305645,0.0010074299,0.00019130995,0.00030844274,0.0029034337],"category_scores_gemma":[0.006679009,0.00006274418,0.00024144887,0.00014012185,0.00046464865,0.00085894315,0.00049439113,0.00040492322,0.00018687981],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0076770703,0.00069908646,0.61597204,0.00020808075,0.00052793126,0.0026454942,0.0037286016,0.018984815,0.02893591,0.13758025,0.0033010088,0.17973977],"study_design_scores_gemma":[0.0005122811,0.002154512,0.6464891,0.00012165061,0.00049202977,0.0033344987,0.007445074,0.11708994,0.012625302,0.19940552,0.010095082,0.0002350166],"about_ca_topic_score_codex":0.0007119119,"about_ca_topic_score_gemma":0.0005160287,"teacher_disagreement_score":0.0029034337,"about_ca_system_score_codex":0.00035789338,"about_ca_system_score_gemma":0.00019193116,"threshold_uncertainty_score":0.0097129345},"labels":[],"label_agreement":null},{"id":"W2393996761","doi":"","title":"Based on Subjective Bayes Method to Bank Loan Risk Appraisal","year":2007,"lang":"en","type":"article","venue":"Microcomputer applications","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Loan; Computer science; Actuarial science; Bayes' theorem; Credit risk; Risk analysis (engineering); Finance; Business; Bayesian probability; Artificial intelligence","score_opus":0.010967984628954618,"score_gpt":0.304857488318607,"score_spread":0.2938895036896524,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2393996761","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010774346,0.0018975042,0.97981733,0.00046248382,0.00019086894,0.0002459687,0.00011001199,0.00018899224,0.0063124076],"genre_scores_gemma":[0.43894356,0.0030930177,0.54989403,0.00034090673,0.00070963096,0.0006282532,0.00041949205,0.00007497288,0.005896143],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9946755,0.0025093774,0.00047574128,0.0005633755,0.0016185141,0.00015744528],"domain_scores_gemma":[0.9942364,0.0036070803,0.00032239748,0.00019474573,0.001525083,0.00011437839],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005104643,0.0012026018,0.001485508,0.0036203195,0.0007545329,0.0026200612,0.0009514499,0.0010488639,0.0029775598],"category_scores_gemma":[0.017006755,0.0003543975,0.0009427839,0.001836838,0.0007834373,0.0025415681,0.0007921654,0.0010917141,0.0005587105],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038720123,0.00032256322,0.009025152,0.0011937055,0.00052642165,0.00039238483,0.0013576443,0.15353784,0.0034416325,0.12681827,0.014307058,0.68869007],"study_design_scores_gemma":[0.00008263075,0.00015174673,0.0025574525,0.00024391492,0.00023199641,0.00030223632,0.00032799656,0.8514764,0.001549756,0.1349292,0.008025979,0.000120756995],"about_ca_topic_score_codex":0.004884506,"about_ca_topic_score_gemma":0.0043486557,"teacher_disagreement_score":0.005104643,"about_ca_system_score_codex":0.0010695155,"about_ca_system_score_gemma":0.001666499,"threshold_uncertainty_score":0.026996255},"labels":[],"label_agreement":null},{"id":"W2540863307","doi":"10.1109/iscram.2011.6184072","title":"An incomplete information-theoretic study of the optimization of stripping non-performance assets caused by the Energy Enterprise Crisis","year":2011,"lang":"en","type":"article","venue":"","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Asset (computer security); Stripping (fiber); Complete information; Computer science; Energy (signal processing); Enterprise information system; Value (mathematics); Risk analysis (engineering); Business; Knowledge management; Computer security; Microeconomics; Engineering; Economics; Mathematics","score_opus":0.015456128122289532,"score_gpt":0.22077406221205673,"score_spread":0.2053179340897672,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2540863307","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13271031,0.0010416402,0.8530685,0.0021240383,0.000078415986,0.000072573865,0.00022691589,0.00004785453,0.010629721],"genre_scores_gemma":[0.9610156,0.0009414724,0.034541067,0.000097211734,0.000076608376,0.00008519306,0.00011088511,0.00002223526,0.0031097683],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99836665,0.00084653415,0.00006060899,0.0001996374,0.00031817224,0.00020848383],"domain_scores_gemma":[0.99222916,0.005747125,0.00106757,0.00022725434,0.00050763274,0.00022118907],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003962445,0.0007471706,0.0013493745,0.0008992785,0.00049853965,0.0019443386,0.00127383,0.001215608,0.00166269],"category_scores_gemma":[0.011752086,0.00068723556,0.00089645956,0.0010008805,0.0020042525,0.003071187,0.0009499459,0.001546686,0.00008165011],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004410733,0.000034414894,0.0009067239,0.000089882386,0.00006560207,0.00013699285,0.000074550786,0.8915623,0.0003895316,0.101649664,0.0005190984,0.0045271493],"study_design_scores_gemma":[0.000008631679,0.00003448272,0.00045618272,0.000014950417,0.000018648338,0.0000204962,0.00005195074,0.9447866,0.00022574209,0.054030497,0.00033862976,0.000013226023],"about_ca_topic_score_codex":0.0052435054,"about_ca_topic_score_gemma":0.0033891925,"teacher_disagreement_score":0.0052435054,"about_ca_system_score_codex":0.0027113417,"about_ca_system_score_gemma":0.0016405876,"threshold_uncertainty_score":0.020955622},"labels":[],"label_agreement":null},{"id":"W2544726177","doi":"10.5539/ijef.v8n11p124","title":"Research and Analysis on Market Value Management in China Based on Method of Rank-Sum Ratio and Principal Component Analysis","year":2016,"lang":"en","type":"article","venue":"International Journal of Economics and Finance","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Jinan University","keywords":"Stock market; Market value added; Market value; Economic Value Added; China; Value (mathematics); Business; Equity (law); Shareholder; Market analysis; Capital market; Economics; Financial economics; Industrial organization; Finance; Microeconomics; Marketing; Corporate governance; Profit (economics); Statistics; Mathematics","score_opus":0.03075781833517207,"score_gpt":0.32011104669038243,"score_spread":0.2893532283552104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2544726177","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6294305,0.036403447,0.24416615,0.004250045,0.0005250545,0.00090227404,0.0014068367,0.00062766945,0.08228806],"genre_scores_gemma":[0.9141344,0.018772932,0.056991037,0.00017048464,0.00034202755,0.00027823568,0.00080888654,0.000047423207,0.008454629],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9967474,0.000622948,0.0003506292,0.00041848645,0.0016643456,0.00019617245],"domain_scores_gemma":[0.99754864,0.000698089,0.00047639324,0.000101055164,0.0010820889,0.00009368303],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037522055,0.0007351075,0.0006158811,0.009064789,0.0007476802,0.0031270506,0.00076182873,0.0004587869,0.0017203833],"category_scores_gemma":[0.004741695,0.00027333677,0.0010230414,0.009565003,0.0009813383,0.0030876396,0.0007138423,0.00048243982,0.0002251105],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009863376,0.0001664795,0.12577224,0.0015423202,0.00031965022,0.0007600439,0.002520166,0.015875999,0.0040349006,0.06493154,0.007619487,0.7763585],"study_design_scores_gemma":[0.0000684597,0.0005358626,0.6068979,0.0008227408,0.00062791817,0.00068384106,0.004891463,0.27980843,0.008451897,0.04035857,0.0565452,0.00030778075],"about_ca_topic_score_codex":0.019355465,"about_ca_topic_score_gemma":0.012324375,"teacher_disagreement_score":0.019355465,"about_ca_system_score_codex":0.002617152,"about_ca_system_score_gemma":0.0042670714,"threshold_uncertainty_score":0.038485646},"labels":[],"label_agreement":null},{"id":"W2620999728","doi":"","title":"An Enhanced Real Estate Transaction Process Based on Blockchain Technology.","year":2017,"lang":"en","type":"article","venue":"Journal of the Association for Information Systems","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Blockchain; Database transaction; Computer science; Process (computing); Transaction processing; Real estate; Business; Computer security; Database; Operating system; Finance","score_opus":0.01127255310370214,"score_gpt":0.27170784749271276,"score_spread":0.26043529438901064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2620999728","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09512897,0.0017531719,0.7804203,0.0016709398,0.00043978984,0.001210594,0.0006976816,0.0016387452,0.1170399],"genre_scores_gemma":[0.75510687,0.0012284918,0.19180629,0.00012861786,0.00006689185,0.00024233593,0.00058300316,0.000080936916,0.050756548],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9986399,0.00032946264,0.000058902828,0.00013556174,0.0006693462,0.00016680741],"domain_scores_gemma":[0.998718,0.00034070745,0.00008214852,0.00037048646,0.00037906854,0.000109557644],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001319105,0.00035596624,0.00037478705,0.0005070538,0.00081192545,0.0018451279,0.0010726133,0.0008635646,0.011490902],"category_scores_gemma":[0.0028168128,0.00019410579,0.00036666455,0.00076393376,0.00071292114,0.0028900097,0.0014484208,0.0005965204,0.0020093925],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007043656,0.00048351003,0.003363479,0.0005072489,0.0000849625,0.0013752511,0.0007246676,0.19930716,0.03356533,0.36837825,0.016146535,0.37535927],"study_design_scores_gemma":[0.00011771301,0.00031037835,0.0020704493,0.00009793769,0.00005917892,0.0007463633,0.00020054885,0.80770385,0.017525675,0.0704082,0.100683436,0.00007626923],"about_ca_topic_score_codex":0.026473224,"about_ca_topic_score_gemma":0.032479152,"teacher_disagreement_score":0.026473224,"about_ca_system_score_codex":0.0015844111,"about_ca_system_score_gemma":0.0030792593,"threshold_uncertainty_score":0.052638292},"labels":[],"label_agreement":null},{"id":"W2937620236","doi":"10.29173/mocs12","title":"Factors Affecting Construction Labor Productivity in China: A Case Study of Chongqing","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Wage; Construction industry; China; Sustainable development; Business; Economics; Labour economics; Economic growth; Engineering; Geography","score_opus":0.01669652985371978,"score_gpt":0.23244698055832153,"score_spread":0.21575045070460175,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937620236","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9987489,0.000047491005,0.00036438,0.00006117421,0.0000012862498,0.000030062436,0.00010076549,0.000004226833,0.00064163696],"genre_scores_gemma":[0.99834526,0.00014110807,0.00039668972,0.000011853385,0.0000020648977,0.000026320064,0.00011647418,0.0000040290397,0.00095627166],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999252,0.00018478317,0.000045540135,0.00008064422,0.00013342296,0.00030361902],"domain_scores_gemma":[0.99908507,0.00034898118,0.00017084384,0.00007532101,0.00014080462,0.00017901104],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013266874,0.0007164007,0.00046535808,0.0022470474,0.0019100542,0.0009170443,0.0010062256,0.00073728804,0.0020347182],"category_scores_gemma":[0.0013647154,0.00039365643,0.0008854999,0.004690352,0.0008982247,0.0006672903,0.0011662501,0.0004351392,0.00015967317],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004671518,0.0011539866,0.8500185,0.00045177146,0.00021258435,0.018169688,0.019806636,0.04031773,0.004823024,0.00363326,0.001702368,0.059243366],"study_design_scores_gemma":[0.000059219863,0.00046544735,0.90552723,0.000079123354,0.00012920839,0.00084115326,0.040789388,0.04509615,0.0017045777,0.00095246534,0.0042703236,0.00008581546],"about_ca_topic_score_codex":0.20364155,"about_ca_topic_score_gemma":0.22525036,"teacher_disagreement_score":0.20364155,"about_ca_system_score_codex":0.008474379,"about_ca_system_score_gemma":0.004792392,"threshold_uncertainty_score":0.4049124},"labels":[],"label_agreement":null},{"id":"W3028354788","doi":"10.3968/11679","title":"IPMS Implementation Efficiency Study Based on Chinese IPMS Standard GB/T 29490","year":2020,"lang":"en","type":"article","venue":"Canadian social science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Benchmarking; Certification; Valuation (finance); Audit; Intellectual property; Computer science; Business; Accounting; Economics; Management; Marketing","score_opus":0.021571021916650092,"score_gpt":0.3129466107447475,"score_spread":0.2913755888280974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3028354788","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99013925,0.00006729885,0.0038904045,0.00007405741,0.0000047894628,0.00007640482,0.00018069135,0.000024052026,0.005542954],"genre_scores_gemma":[0.99777395,0.00005513762,0.001313055,0.0000065742943,0.0000018368991,0.000034895656,0.00019021546,0.0000065413856,0.000617882],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9928417,0.0024488717,0.0005403121,0.00050796027,0.002909956,0.0007512709],"domain_scores_gemma":[0.9891627,0.0050695515,0.0013246478,0.0009307302,0.0033553482,0.00015706019],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0068098987,0.00042053152,0.00048635597,0.0030134579,0.00048482965,0.0013434547,0.0006542737,0.00040607556,0.0018291179],"category_scores_gemma":[0.014830263,0.0002639893,0.0008686052,0.0047959452,0.00068155647,0.00202965,0.00087956473,0.00054885104,0.00019312254],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009370334,0.0011226254,0.5000544,0.00085076224,0.00045633074,0.001021216,0.0023321782,0.31599504,0.0071667605,0.026050236,0.0032880171,0.14072543],"study_design_scores_gemma":[0.000056454657,0.0013309984,0.6309522,0.00008274045,0.00024356034,0.00017992021,0.004161106,0.34706205,0.010227958,0.0022789175,0.0033341541,0.00008988597],"about_ca_topic_score_codex":0.03004185,"about_ca_topic_score_gemma":0.016463852,"teacher_disagreement_score":0.03004185,"about_ca_system_score_codex":0.0051159956,"about_ca_system_score_gemma":0.002857125,"threshold_uncertainty_score":0.059733987},"labels":[],"label_agreement":null},{"id":"W3118554597","doi":"","title":"An infrastructure condition assessment model","year":2007,"lang":"en","type":"article","venue":"","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Environmental science; Business; Risk analysis (engineering)","score_opus":0.012388262737677083,"score_gpt":0.31987986310311256,"score_spread":0.3074916003654355,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3118554597","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06310433,0.0002995765,0.82927215,0.0012001947,0.00010013791,0.00023803231,0.002351662,0.0011731108,0.10226071],"genre_scores_gemma":[0.91477865,0.00031459116,0.04564045,0.000108903885,0.000049929065,0.0003018327,0.0010879152,0.00009552591,0.03762223],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99944085,0.00014527624,0.0000215612,0.00014278841,0.00018180686,0.00006767276],"domain_scores_gemma":[0.99925953,0.00029416368,0.000076800214,0.000052600048,0.00027601776,0.00004085065],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007984978,0.0007369498,0.0005361282,0.00094770215,0.000462267,0.0014026347,0.0013834658,0.0013752045,0.010108587],"category_scores_gemma":[0.0024947266,0.00035917052,0.0005411421,0.0009076907,0.0005401853,0.0020992255,0.000783217,0.0009524349,0.0013470151],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023579254,0.000029376944,0.00052405323,0.00002140092,0.000011647736,0.000046137375,0.000022529435,0.9623921,0.00044529926,0.024909493,0.0014358626,0.010138503],"study_design_scores_gemma":[0.0000049858977,0.000010311777,0.00023067105,0.000003861429,0.000007969949,0.00001092728,0.0000072024336,0.9917427,0.00015271018,0.0067334604,0.0010888698,0.000006393331],"about_ca_topic_score_codex":0.02096551,"about_ca_topic_score_gemma":0.014594821,"teacher_disagreement_score":0.02096551,"about_ca_system_score_codex":0.0017182628,"about_ca_system_score_gemma":0.0018574435,"threshold_uncertainty_score":0.041686952},"labels":[],"label_agreement":null},{"id":"W4230226938","doi":"10.5539/mas.v3n6p0b","title":"Modern Applied Science, Vol. 3, No. 6, June 2009, all in one file, Part B","year":2009,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Natural Science Foundation of Tianjin City","keywords":"Computer science","score_opus":0.03631280161802797,"score_gpt":0.2563513877074852,"score_spread":0.22003858608945726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230226938","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016681714,0.013455748,0.022291256,0.01581211,0.009452182,0.0005974292,0.015877958,0.00332762,0.902504],"genre_scores_gemma":[0.05277459,0.008267849,0.010977299,0.001493638,0.0011280293,0.00020645617,0.006663487,0.00066654664,0.9178221],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999009,0.0001106971,0.00007699918,0.000102631566,0.0006368988,0.000063651045],"domain_scores_gemma":[0.9976362,0.00061007333,0.0001123126,0.0004969178,0.0009961495,0.00014841474],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0012279482,0.00050238916,0.00074064994,0.0020276478,0.0011431419,0.0034943596,0.0006705256,0.0008163533,0.3674275],"category_scores_gemma":[0.008371748,0.00045855367,0.0006725227,0.003942172,0.0006406057,0.0022520935,0.0012840006,0.0012343386,0.1376744],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014047309,0.000095922034,0.002544674,0.0003114577,0.00002198895,0.00007573354,0.00010212562,0.0010508138,0.000879137,0.017162388,0.7259065,0.25170884],"study_design_scores_gemma":[0.000034017845,0.00014107778,0.010235472,0.00023565527,0.000021973583,0.0002435247,0.00019521051,0.0035972774,0.0016754176,0.016109545,0.9674836,0.000027229149],"about_ca_topic_score_codex":0.0064973035,"about_ca_topic_score_gemma":0.009374563,"teacher_disagreement_score":0.63257253,"about_ca_system_score_codex":0.0014422485,"about_ca_system_score_gemma":0.0020559789,"threshold_uncertainty_score":0.9022879},"labels":[],"label_agreement":null},{"id":"W4241233386","doi":"10.1002/cjce.22992","title":"Table of Contents","year":2018,"lang":"en","type":"article","venue":"The Canadian Journal of Chemical Engineering","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Table (database); Citation; Information retrieval; Computer science; Table of contents; World Wide Web; Library science; Database","score_opus":0.018942929395749302,"score_gpt":0.2067375724463339,"score_spread":0.1877946430505846,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4241233386","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000771155,0.005567287,0.003987028,0.0051583922,0.009884952,0.00074070005,0.09011779,0.0031492796,0.8806234],"genre_scores_gemma":[0.0065962668,0.00828187,0.0044649416,0.0031182787,0.0037303702,0.00037884412,0.06796516,0.0015842133,0.90388006],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99935573,0.000056288423,0.000039143164,0.00009841942,0.00040356079,0.000046861638],"domain_scores_gemma":[0.995346,0.00060268753,0.00017438235,0.00032868455,0.0029909539,0.0005572705],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00072515494,0.00081827934,0.00094288675,0.0037604568,0.001570019,0.0039648777,0.0014454349,0.0008891259,0.8313976],"category_scores_gemma":[0.00830161,0.00031355486,0.00044339173,0.003500317,0.0003790751,0.0017059621,0.0011603473,0.0010205538,0.68530583],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015318488,0.000015826257,0.00015599011,0.0002564458,0.000003695468,0.000019643216,0.0000131682755,0.00012980272,0.00013896533,0.001674751,0.9587169,0.03885954],"study_design_scores_gemma":[0.0000040930704,0.000011120952,0.00032397383,0.00014718255,0.0000046321325,0.000045523513,0.000020193387,0.00006837181,0.00009410884,0.001114042,0.9981616,0.0000051313928],"about_ca_topic_score_codex":0.012416111,"about_ca_topic_score_gemma":0.014624731,"teacher_disagreement_score":0.1686024,"about_ca_system_score_codex":0.0022178718,"about_ca_system_score_gemma":0.004680647,"threshold_uncertainty_score":0.24049085},"labels":[],"label_agreement":null},{"id":"W4242634225","doi":"10.32920/ryerson.14658255.v1","title":"Network Screening Methods to Identify Roadway Sites for Safety Investigation: An Examination of Some Critical Issues","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Negative binomial distribution; Variable (mathematics); Computer science; Key (lock); Regression analysis; Range (aeronautics); Function (biology); Transport engineering; Statistics; Process (computing); Data mining; Mathematics; Engineering; Computer security","score_opus":0.14046079281647852,"score_gpt":0.4390505832918545,"score_spread":0.2985897904753759,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4242634225","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13487718,0.007962918,0.837148,0.0035346171,0.00014150636,0.00046683184,0.0002287342,0.00035431542,0.015285866],"genre_scores_gemma":[0.64254075,0.0071074865,0.34316579,0.00029342942,0.0001594531,0.0003217428,0.00028032094,0.00012936795,0.006001639],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9949869,0.0028549766,0.00014272549,0.00032672493,0.0015644719,0.00012422242],"domain_scores_gemma":[0.97429013,0.019073902,0.0011931463,0.0010966366,0.0041295774,0.00021649008],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008383394,0.0006688008,0.00058337214,0.0028032667,0.0006193969,0.0012868715,0.001048745,0.00062670495,0.0019283951],"category_scores_gemma":[0.029289966,0.00032982082,0.00047123007,0.002336268,0.0007971218,0.0017756129,0.0008090159,0.00078753126,0.0002823518],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000174408,0.0002982789,0.043695368,0.00074689754,0.00014413772,0.00022695951,0.00071223744,0.18454148,0.004507439,0.07690429,0.008300042,0.6797485],"study_design_scores_gemma":[0.000032520835,0.0002593763,0.022437505,0.00026919728,0.00007651801,0.0003120192,0.0009548438,0.90834916,0.007401726,0.04756187,0.012265742,0.00007945097],"about_ca_topic_score_codex":0.008995872,"about_ca_topic_score_gemma":0.010147597,"teacher_disagreement_score":0.008995872,"about_ca_system_score_codex":0.0017479729,"about_ca_system_score_gemma":0.0014971516,"threshold_uncertainty_score":0.04433614},"labels":[],"label_agreement":null},{"id":"W4242887918","doi":"10.1002/cjce.22675","title":"Table of Contents","year":2017,"lang":"en","type":"article","venue":"The Canadian Journal of Chemical Engineering","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Table (database); Table of contents; Citation; Computer science; Information retrieval; World Wide Web; Database","score_opus":0.025752381911226356,"score_gpt":0.2202533494830843,"score_spread":0.19450096757185795,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4242887918","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000787917,0.005731103,0.0041065356,0.005403316,0.010219066,0.0007630332,0.092032574,0.003232117,0.87772435],"genre_scores_gemma":[0.0066644303,0.008440121,0.0045056413,0.0032597105,0.003843582,0.0003894909,0.06830669,0.0016017292,0.90298873],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993622,0.00005695898,0.000039227532,0.00009889037,0.00039643046,0.00004637388],"domain_scores_gemma":[0.9953264,0.000612355,0.00017688496,0.0003274223,0.0029933478,0.0005635407],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0007276415,0.00081831554,0.00094418804,0.0037633055,0.00154979,0.0039553773,0.0014454672,0.00089958316,0.83069056],"category_scores_gemma":[0.008401445,0.00031329726,0.00044786112,0.0034603656,0.000375394,0.0017047005,0.0011658147,0.0010214195,0.6867993],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001542714,0.000015585802,0.00015649856,0.0002581308,0.0000037372122,0.000019909769,0.000013080951,0.00012905439,0.00013628948,0.0016567332,0.95892197,0.038673647],"study_design_scores_gemma":[0.000004177191,0.00001113789,0.00032609093,0.00015218923,0.000004695848,0.000046009463,0.000020260532,0.000069574584,0.000093803996,0.0011176802,0.99814916,0.0000051955894],"about_ca_topic_score_codex":0.012064072,"about_ca_topic_score_gemma":0.01418527,"teacher_disagreement_score":0.16930944,"about_ca_system_score_codex":0.0022000473,"about_ca_system_score_gemma":0.0046485243,"threshold_uncertainty_score":0.24149936},"labels":[],"label_agreement":null},{"id":"W4246755594","doi":"10.32920/ryerson.14658255","title":"Network Screening Methods to Identify Roadway Sites for Safety Investigation: An Examination of Some Critical Issues","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Negative binomial distribution; Variable (mathematics); Computer science; Range (aeronautics); Key (lock); Regression analysis; Statistics; Function (biology); Transport engineering; Data mining; Mathematics; Engineering; Computer security","score_opus":0.14046079281647852,"score_gpt":0.4390505832918545,"score_spread":0.2985897904753759,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246755594","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13487718,0.007962918,0.837148,0.0035346171,0.00014150636,0.00046683184,0.0002287342,0.00035431542,0.015285866],"genre_scores_gemma":[0.64254075,0.0071074865,0.34316579,0.00029342942,0.0001594531,0.0003217428,0.00028032094,0.00012936795,0.006001639],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9949869,0.0028549766,0.00014272549,0.00032672493,0.0015644719,0.00012422242],"domain_scores_gemma":[0.97429013,0.019073902,0.0011931463,0.0010966366,0.0041295774,0.00021649008],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008383394,0.0006688008,0.00058337214,0.0028032667,0.0006193969,0.0012868715,0.001048745,0.00062670495,0.0019283951],"category_scores_gemma":[0.029289966,0.00032982082,0.00047123007,0.002336268,0.0007971218,0.0017756129,0.0008090159,0.00078753126,0.0002823518],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000174408,0.0002982789,0.043695368,0.00074689754,0.00014413772,0.00022695951,0.00071223744,0.18454148,0.004507439,0.07690429,0.008300042,0.6797485],"study_design_scores_gemma":[0.000032520835,0.0002593763,0.022437505,0.00026919728,0.00007651801,0.0003120192,0.0009548438,0.90834916,0.007401726,0.04756187,0.012265742,0.00007945097],"about_ca_topic_score_codex":0.008995872,"about_ca_topic_score_gemma":0.010147597,"teacher_disagreement_score":0.008995872,"about_ca_system_score_codex":0.0017479729,"about_ca_system_score_gemma":0.0014971516,"threshold_uncertainty_score":0.04433614},"labels":[],"label_agreement":null},{"id":"W4247384514","doi":"10.1002/cjce.22974","title":"Table of Contents","year":2018,"lang":"en","type":"article","venue":"The Canadian Journal of Chemical Engineering","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Table (database); Citation; Computer science; Table of contents; Information retrieval; World Wide Web; Database","score_opus":0.018942929395749302,"score_gpt":0.2067375724463339,"score_spread":0.1877946430505846,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4247384514","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000771155,0.005567287,0.003987028,0.0051583922,0.009884952,0.00074070005,0.09011779,0.0031492796,0.8806234],"genre_scores_gemma":[0.0065962668,0.00828187,0.0044649416,0.0031182787,0.0037303702,0.00037884412,0.06796516,0.0015842133,0.90388006],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99935573,0.000056288423,0.000039143164,0.00009841942,0.00040356079,0.000046861638],"domain_scores_gemma":[0.995346,0.00060268753,0.00017438235,0.00032868455,0.0029909539,0.0005572705],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00072515494,0.00081827934,0.00094288675,0.0037604568,0.001570019,0.0039648777,0.0014454349,0.0008891259,0.8313976],"category_scores_gemma":[0.00830161,0.00031355486,0.00044339173,0.003500317,0.0003790751,0.0017059621,0.0011603473,0.0010205538,0.68530583],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015318488,0.000015826257,0.00015599011,0.0002564458,0.000003695468,0.000019643216,0.0000131682755,0.00012980272,0.00013896533,0.001674751,0.9587169,0.03885954],"study_design_scores_gemma":[0.0000040930704,0.000011120952,0.00032397383,0.00014718255,0.0000046321325,0.000045523513,0.000020193387,0.00006837181,0.00009410884,0.001114042,0.9981616,0.0000051313928],"about_ca_topic_score_codex":0.012416111,"about_ca_topic_score_gemma":0.014624731,"teacher_disagreement_score":0.1686024,"about_ca_system_score_codex":0.0022178718,"about_ca_system_score_gemma":0.004680647,"threshold_uncertainty_score":0.24049085},"labels":[],"label_agreement":null},{"id":"W4283819883","doi":"10.46873/2300-3960.1355","title":"Research advances into mine safety science and engineering","year":2022,"lang":"en","type":"article","venue":"Journal of Sustainable Mining","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Engineering; Mine safety; Science and engineering; Construction engineering; Engineering ethics; Forensic engineering; Waste management; Coal mining","score_opus":0.020304207565884254,"score_gpt":0.30721595049133194,"score_spread":0.2869117429254477,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283819883","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06584234,0.22415565,0.41180557,0.06170421,0.002767116,0.000111153546,0.00064088864,0.00040363293,0.23256937],"genre_scores_gemma":[0.6523085,0.22456148,0.0783499,0.0027351275,0.003410524,0.000100351055,0.000553669,0.00023040792,0.037750024],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9978022,0.00081720133,0.00012400805,0.0002443542,0.0008701714,0.00014193208],"domain_scores_gemma":[0.98508227,0.010165294,0.00064084685,0.0009183292,0.0027271311,0.00046612707],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0047878907,0.00096133794,0.0011055067,0.0015421081,0.0004655185,0.004921983,0.0013097342,0.0020166584,0.009959844],"category_scores_gemma":[0.013597817,0.00040387755,0.0008273626,0.002190142,0.002088826,0.006227271,0.0015325755,0.0029375819,0.0015029839],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010126712,0.00041931108,0.0038070253,0.00092037546,0.0000854906,0.00006316524,0.00016267791,0.07813331,0.0013682959,0.6480529,0.012354835,0.25453138],"study_design_scores_gemma":[0.000022117676,0.00023711915,0.002593327,0.00093937427,0.00008500917,0.00010094473,0.00052830885,0.24015443,0.0017561618,0.59838593,0.15514544,0.000051924293],"about_ca_topic_score_codex":0.004778924,"about_ca_topic_score_gemma":0.005817011,"teacher_disagreement_score":0.009959844,"about_ca_system_score_codex":0.0025823507,"about_ca_system_score_gemma":0.0055429763,"threshold_uncertainty_score":0.033318996},"labels":[],"label_agreement":null},{"id":"W4360592091","doi":"10.5267/j.dsl.2023.1.003","title":"A proposed NCAAA-based approach to the self-evaluation of higher education programs for academic accreditation: A comparative study using TOPSIS","year":2023,"lang":"en","type":"article","venue":"Decision Science Letters","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"TOPSIS; Accreditation; Computer science; Quality (philosophy); Preference; Scale (ratio); Similarity (geometry); Management science; Ideal solution; Higher education; Process management; Engineering management; Risk analysis (engineering); Operations research; Artificial intelligence; Mathematics; Engineering; Statistics; Medical education; Business","score_opus":0.25245207032675676,"score_gpt":0.43896646584336446,"score_spread":0.1865143955166077,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4360592091","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5303817,0.0011420494,0.38848436,0.0014064494,0.00019364044,0.003330542,0.00048431562,0.00024570525,0.0743312],"genre_scores_gemma":[0.7489083,0.00037337677,0.24715467,0.000052304258,0.000012714662,0.0014242171,0.00034724566,0.000009663355,0.0017175144],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.97548544,0.014999587,0.0017490154,0.0007904871,0.0066251154,0.0003502953],"domain_scores_gemma":[0.98445255,0.006746464,0.00080168905,0.0005520429,0.0071329614,0.00031426136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020912305,0.00071525393,0.00076091965,0.008224671,0.0013689317,0.0043058246,0.0010642684,0.00058286946,0.002897759],"category_scores_gemma":[0.023881616,0.00024177645,0.0011811132,0.007510457,0.0013675224,0.0022974722,0.0015656308,0.0008118001,0.00030138026],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00078173884,0.0020613773,0.10796872,0.0028608716,0.0007345973,0.00044521244,0.020855611,0.029115018,0.011230885,0.105927706,0.004473127,0.71354514],"study_design_scores_gemma":[0.00032791085,0.0065656607,0.25521004,0.0028466098,0.0010284524,0.0012257481,0.113283366,0.48813358,0.016171731,0.057733726,0.05703588,0.00043732414],"about_ca_topic_score_codex":0.006660298,"about_ca_topic_score_gemma":0.0076218806,"teacher_disagreement_score":0.020912305,"about_ca_system_score_codex":0.00469938,"about_ca_system_score_gemma":0.0066566044,"threshold_uncertainty_score":0.11059618},"labels":[],"label_agreement":null},{"id":"W4372361408","doi":"10.54691/bcpbm.v44i.4814","title":"Portfolios Optimization under Constraints","year":2023,"lang":"en","type":"article","venue":"BCP Business & Management","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Arts Foundation; University of Toronto","funders":"","keywords":"Sharpe ratio; Portfolio; Economics; Econometrics; Volatility (finance); Index (typography); Covariance matrix; Portfolio optimization; Variance (accounting); Rate of return on a portfolio; Covariance; Investment (military); Mathematics; Financial economics; Computer science; Statistics","score_opus":0.025063104711897842,"score_gpt":0.24760831331183325,"score_spread":0.2225452085999354,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4372361408","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.111501895,0.0016036056,0.85354406,0.00075764564,0.00006712147,0.00018328748,0.0007376378,0.00028106425,0.031323694],"genre_scores_gemma":[0.87726426,0.0011851607,0.10535322,0.00022523337,0.000066767316,0.00041698228,0.0010086743,0.00012847515,0.014351322],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99904424,0.00042490623,0.000046889407,0.00016583897,0.00015932099,0.00015871288],"domain_scores_gemma":[0.9983877,0.0011233784,0.00017477869,0.00007409487,0.00017851728,0.000061465005],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001796539,0.0012571436,0.0016040227,0.0008101653,0.00034323355,0.0020494412,0.0007323003,0.0011448315,0.004012099],"category_scores_gemma":[0.0051703644,0.0005707396,0.0007891099,0.001182842,0.00035950006,0.0015130204,0.00088878925,0.0009335233,0.0005011112],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044486686,0.000028760178,0.00079671136,0.00006315974,0.000039626186,0.000073098105,0.000018600993,0.96860707,0.00021279306,0.013650601,0.00093455974,0.015530564],"study_design_scores_gemma":[0.000011774374,0.00003467715,0.00026906264,0.000012983149,0.000012538394,0.000028244418,0.000014589357,0.98981315,0.00019285607,0.008784131,0.00082098454,0.000005066752],"about_ca_topic_score_codex":0.0042069177,"about_ca_topic_score_gemma":0.0018127987,"teacher_disagreement_score":0.0042069177,"about_ca_system_score_codex":0.00096225285,"about_ca_system_score_gemma":0.0012437903,"threshold_uncertainty_score":0.0134218335},"labels":[],"label_agreement":null},{"id":"W4385078309","doi":"10.18280/isi.280313","title":"A Sustainable Performance Assessment System for Road Freight Transport Based on Artificial Neural Networks","year":2023,"lang":"en","type":"article","venue":"Ingénierie des systèmes d information","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Artificial neural network; Transport engineering; Computer science; Business; Artificial intelligence; Engineering","score_opus":0.019041605810289623,"score_gpt":0.2420719734029754,"score_spread":0.22303036759268577,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385078309","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04769893,0.00011428718,0.9431613,0.0001872356,0.000029261102,0.00024870038,0.00045078123,0.0025274528,0.0055820798],"genre_scores_gemma":[0.85285866,0.00019540584,0.14259806,0.000044423716,0.000023896697,0.00057817,0.0010954863,0.00008781974,0.0025180667],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99905866,0.00022181321,0.000099839555,0.00021417465,0.0003426811,0.00006285894],"domain_scores_gemma":[0.99923766,0.00017586068,0.0001264057,0.00006435449,0.00036801017,0.000027794513],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015110803,0.00095890596,0.00070099,0.001696408,0.0005257399,0.0018856424,0.0009970138,0.00079135573,0.0023762002],"category_scores_gemma":[0.002864518,0.0002366937,0.0005490507,0.0014271302,0.0003425231,0.0018579793,0.0009052348,0.0006359475,0.0005325005],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012906855,0.00013781282,0.0044804015,0.00010704956,0.00006410321,0.00009246749,0.0000844994,0.8567487,0.0031093643,0.006787643,0.0014432684,0.12681563],"study_design_scores_gemma":[0.000003158024,0.00002413934,0.00062256894,0.000010179576,0.000008583041,0.000008326365,0.000012432245,0.996808,0.0008726789,0.001143423,0.000477882,0.000008556013],"about_ca_topic_score_codex":0.01379946,"about_ca_topic_score_gemma":0.009476927,"teacher_disagreement_score":0.01379946,"about_ca_system_score_codex":0.0022292424,"about_ca_system_score_gemma":0.0012501469,"threshold_uncertainty_score":0.027438283},"labels":[],"label_agreement":null},{"id":"W4402195061","doi":"10.1002/qre.3654","title":"Reliability test for degradation data based on ranked set sampling","year":2024,"lang":"en","type":"article","venue":"Quality and Reliability Engineering International","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"Xi’an Jiaotong-Liverpool University; Government of Jiangsu Province; Natural Sciences and Engineering Research Council of Canada; Natural Science Foundation of Jiangsu Province; National Natural Science Foundation of China","keywords":"Reliability engineering; Reliability (semiconductor); Sampling (signal processing); Computer science; Statistics; Data set; Data mining; Degradation (telecommunications); Test (biology); Engineering; Mathematics; Biology","score_opus":0.1071854630515051,"score_gpt":0.36449784980074085,"score_spread":0.25731238674923573,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402195061","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12017904,0.00029722103,0.8761373,0.00020174796,0.00006957285,0.00027592617,0.00027967757,0.00032506886,0.0022344138],"genre_scores_gemma":[0.87294585,0.00011200777,0.12514654,0.00015685565,0.00006715881,0.00042485914,0.0004979699,0.000049215665,0.0005996293],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9788552,0.013926293,0.0006888094,0.0013358153,0.0046747844,0.0005191107],"domain_scores_gemma":[0.8900056,0.090289906,0.0051129283,0.0062928763,0.007557031,0.00074163126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019636696,0.000962004,0.0016240313,0.002585766,0.0006512006,0.0013766919,0.0022799117,0.0014262254,0.0033793831],"category_scores_gemma":[0.09665461,0.00027529013,0.0011472749,0.0015726269,0.0022585113,0.0023974823,0.0013455015,0.001381222,0.0005761511],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0031512266,0.0010507155,0.051758405,0.0015418924,0.0008613952,0.00086912286,0.0008483543,0.38835222,0.021778993,0.24754317,0.004691065,0.27755353],"study_design_scores_gemma":[0.00015165193,0.0017041824,0.009099744,0.00012467185,0.00009701188,0.0003911576,0.0003011372,0.91925436,0.010657665,0.056545574,0.0015709917,0.000101883445],"about_ca_topic_score_codex":0.0011614935,"about_ca_topic_score_gemma":0.00051513186,"teacher_disagreement_score":0.019636696,"about_ca_system_score_codex":0.00093182153,"about_ca_system_score_gemma":0.0013614226,"threshold_uncertainty_score":0.10385001},"labels":[],"label_agreement":null},{"id":"W4402602643","doi":"10.1007/978-3-031-61499-6_2","title":"Construction Supply Chain Analysis on Forecasting the Demand for Small Equipment, Tools, and Consumables for Industrial Construction Projects","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Consumables; Supply chain; Demand forecasting; Manufacturing engineering; Business; Operations management; Engineering; Computer science; Marketing","score_opus":0.06132603582515857,"score_gpt":0.23938331391901388,"score_spread":0.1780572780938553,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402602643","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5687579,0.0014308165,0.4072968,0.00066237524,0.0001245617,0.00021018297,0.0018014708,0.00043928175,0.019276733],"genre_scores_gemma":[0.9418952,0.000874311,0.048341766,0.00003817351,0.000046130484,0.00009225432,0.0013674523,0.00006320605,0.0072815665],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99974126,0.00009306931,0.000013936607,0.0000446511,0.000062247665,0.00004484036],"domain_scores_gemma":[0.9988158,0.000964558,0.00003371541,0.000038700684,0.000116899835,0.000030348832],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008961734,0.00071903126,0.00053549383,0.0011801578,0.00035563248,0.00063812896,0.0006259293,0.00072366104,0.0036958929],"category_scores_gemma":[0.0019566622,0.00041114909,0.0010240459,0.0022296475,0.00035152372,0.000919364,0.0003838121,0.000739364,0.0002957306],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008187385,0.000048700273,0.0031105622,0.00004036143,0.000031443076,0.00005513177,0.000034310047,0.9619272,0.0008314878,0.0027428071,0.00068878155,0.030407468],"study_design_scores_gemma":[0.00000218617,0.000016896141,0.0009032093,0.0000037248697,0.000006091173,0.0000035157686,0.000010377306,0.9969682,0.00018482596,0.0017582802,0.00013914335,0.000003520543],"about_ca_topic_score_codex":0.059168946,"about_ca_topic_score_gemma":0.029289383,"teacher_disagreement_score":0.059168946,"about_ca_system_score_codex":0.0013223208,"about_ca_system_score_gemma":0.0009510448,"threshold_uncertainty_score":0.11764908},"labels":[],"label_agreement":null},{"id":"W4403317550","doi":"10.1155/2024/1436605","title":"Cascading Reliability Assessment of International Railway Freight Network Based on Coupled Map Lattices: A Case Study of China Railway Express","year":2024,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"China Railway","keywords":"Reliability (semiconductor); China; Transport engineering; Engineering; Railway system; Reliability engineering; Computer science; Forensic engineering; Geography; Physics","score_opus":0.015207080202154813,"score_gpt":0.3005226436260846,"score_spread":0.2853155634239298,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403317550","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9421161,0.00015315475,0.05439894,0.00019662926,0.000013489313,0.00005618891,0.00014944066,0.000100851095,0.0028152294],"genre_scores_gemma":[0.99593425,0.000055943667,0.0033396538,0.0000053960994,0.0000022335014,0.000016673468,0.00003741077,0.000006451803,0.0006019374],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995388,0.00017459481,0.000017420836,0.00008523162,0.00009192808,0.00009203282],"domain_scores_gemma":[0.99846953,0.0008006825,0.00020788505,0.000082043545,0.00029440774,0.00014537219],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011012581,0.0007771149,0.0004453218,0.001199056,0.00084461906,0.0007318363,0.0008711478,0.0007492929,0.0012014072],"category_scores_gemma":[0.002214387,0.00027162425,0.0007820018,0.0009224438,0.0010307113,0.0011261097,0.00095894025,0.0005986134,0.00008171577],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000064705164,0.000034818113,0.0058428687,0.000033651904,0.00003307222,0.00059332454,0.00012673176,0.9845871,0.0011464689,0.0044515086,0.00024172662,0.0028440736],"study_design_scores_gemma":[0.0000070890433,0.000035228564,0.0012612953,0.0000029960756,0.000020053116,0.000064250606,0.00016545715,0.9956866,0.0005373546,0.0020875658,0.00012072281,0.000011353557],"about_ca_topic_score_codex":0.03687972,"about_ca_topic_score_gemma":0.01739444,"teacher_disagreement_score":0.03687972,"about_ca_system_score_codex":0.0017644202,"about_ca_system_score_gemma":0.00097353733,"threshold_uncertainty_score":0.073330104},"labels":[],"label_agreement":null},{"id":"W4408896951","doi":"10.23977/jaip.2025.080114","title":"Research on internal financial fraud identification model of enterprise based on ensemble learning","year":2025,"lang":"en","type":"article","venue":"Journal of Artificial Intelligence Practice","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Identification (biology); Ensemble learning; Ensemble forecasting; Business; Computer science; Artificial intelligence","score_opus":0.11475534095560752,"score_gpt":0.4240000696679757,"score_spread":0.3092447287123682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408896951","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27443886,0.002858218,0.71311927,0.0014887362,0.00015458558,0.000101540136,0.00019953607,0.00042938621,0.0072098863],"genre_scores_gemma":[0.96527725,0.0014564195,0.030338127,0.0001196436,0.00008594412,0.000070779424,0.00021087409,0.000018964338,0.0024219367],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99898344,0.00030717926,0.000065967455,0.000213154,0.00025519662,0.00017500661],"domain_scores_gemma":[0.9983039,0.0007829527,0.00022666888,0.000095837415,0.0005152931,0.00007532387],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003193131,0.00075903337,0.0011914746,0.0018208884,0.0006168096,0.0017038016,0.00141538,0.0008454114,0.001062575],"category_scores_gemma":[0.004565817,0.0003139916,0.0011816099,0.0015113062,0.00046300236,0.002401193,0.00079945254,0.0010887079,0.00023744526],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013585402,0.00016006813,0.035683077,0.000118918506,0.00023871675,0.00027093553,0.00025196522,0.79652864,0.0009629409,0.019281162,0.0027994532,0.1435682],"study_design_scores_gemma":[0.0000018605217,0.000014093779,0.0012163348,0.000011055605,0.000019197998,0.000035986188,0.000019028934,0.9960557,0.00015762389,0.002229034,0.00023469212,0.000005415085],"about_ca_topic_score_codex":0.009505688,"about_ca_topic_score_gemma":0.004662438,"teacher_disagreement_score":0.009505688,"about_ca_system_score_codex":0.0011166693,"about_ca_system_score_gemma":0.0011575707,"threshold_uncertainty_score":0.018900692},"labels":[],"label_agreement":null},{"id":"W4409503212","doi":"10.1155/atr/2036525","title":"Evaluation of Smart Highway Operation and Maintenance Risk: Based on AHP‐FCE Model","year":2025,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Analytic hierarchy process; Transport engineering; Computer science; Highway maintenance; Engineering; Reliability engineering; Operations research","score_opus":0.015629386979567342,"score_gpt":0.2740877261414474,"score_spread":0.25845833916188005,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409503212","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29749605,0.00071241095,0.68393093,0.0010856781,0.00009998146,0.0004709411,0.00049869734,0.00018743234,0.0155178225],"genre_scores_gemma":[0.96218985,0.00025634837,0.035376754,0.00003618763,0.000022002874,0.00019912349,0.0001730746,0.000012333304,0.0017343423],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99847704,0.0006586448,0.000095218915,0.00015674978,0.00042417404,0.00018811606],"domain_scores_gemma":[0.9981653,0.0012096518,0.0001421459,0.000040565512,0.00037691597,0.00006536844],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00232931,0.00083885976,0.000847223,0.001909307,0.0007226914,0.0016817902,0.0012176167,0.0013140023,0.0023496666],"category_scores_gemma":[0.0035237384,0.00038339486,0.0013930784,0.0014307342,0.0005054905,0.0012887868,0.0008651027,0.0009527112,0.00012021577],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037038062,0.0000741653,0.0028160163,0.00006760489,0.00007471234,0.00009893381,0.00009980784,0.9805117,0.00030389623,0.004690211,0.00036752725,0.010858457],"study_design_scores_gemma":[0.0000031507138,0.000014177246,0.0003805058,0.000006391356,0.00000854146,0.000008033026,0.00004307688,0.9984139,0.00006129417,0.0009586024,0.00009697263,0.000005308159],"about_ca_topic_score_codex":0.035224672,"about_ca_topic_score_gemma":0.01667319,"teacher_disagreement_score":0.035224672,"about_ca_system_score_codex":0.0019537627,"about_ca_system_score_gemma":0.0020618907,"threshold_uncertainty_score":0.07003927},"labels":[],"label_agreement":null},{"id":"W4409603261","doi":"10.61091/jcmcc127b-119","title":"Research on Performance Evaluation and Appraisal Methods of Asset Management in Public Universities Introducing Super-Efficient DEA Modeling","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Performance appraisal; Asset management; Business; Asset (computer security); Engineering management; Computer science; Management science; Process management; Risk analysis (engineering); Engineering; Economics; Management; Finance; Computer security","score_opus":0.0638311171784953,"score_gpt":0.38867440802771064,"score_spread":0.32484329084921537,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409603261","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.133002,0.0010795783,0.8555344,0.00049822417,0.00004805872,0.000164675,0.00012249821,0.00011488988,0.009435671],"genre_scores_gemma":[0.9370258,0.000717411,0.0604191,0.000035036297,0.00003475231,0.00014654826,0.00014645704,0.000023094966,0.0014518447],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99484503,0.0030005034,0.00024806868,0.0005592777,0.0010390558,0.00030804],"domain_scores_gemma":[0.99351585,0.0038932501,0.00088114804,0.00041188035,0.0011511621,0.00014664554],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0076762447,0.0011449335,0.0010454451,0.0028529696,0.00051659445,0.0026989665,0.0010320669,0.00075660116,0.0016003342],"category_scores_gemma":[0.012032374,0.0004160231,0.001225275,0.0028358072,0.0008473627,0.0031548608,0.0009534319,0.0010606541,0.00017167939],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008017544,0.00016847865,0.018058771,0.00023126151,0.0002964324,0.00007012527,0.0002804107,0.8206189,0.0014660977,0.06282751,0.0008312248,0.09507068],"study_design_scores_gemma":[0.000007273582,0.00006087204,0.003923796,0.000025239337,0.0000341412,0.000020373078,0.00010668714,0.98175967,0.00057949114,0.012652423,0.0008136678,0.000016447437],"about_ca_topic_score_codex":0.006908858,"about_ca_topic_score_gemma":0.004652559,"teacher_disagreement_score":0.0076762447,"about_ca_system_score_codex":0.0028914886,"about_ca_system_score_gemma":0.0022493033,"threshold_uncertainty_score":0.040596366},"labels":[],"label_agreement":null},{"id":"W4409787579","doi":"10.61091/jcmcc127a-325","title":"Optimization Research of Enterprise Supply Chain Demand Forecasting and Inventory Cost Control Based on Machine Learning Models","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Demand forecasting; Supply chain; Inventory control; Control (management); Computer science; Supply chain optimization; Operations research; Industrial engineering; Supply chain management; Business; Artificial intelligence; Engineering; Marketing","score_opus":0.03992813757604711,"score_gpt":0.2886257807869422,"score_spread":0.24869764321089508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409787579","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.052713834,0.0020649815,0.937416,0.00059092004,0.000077615325,0.000040891628,0.000072481766,0.0002134268,0.006809697],"genre_scores_gemma":[0.9507527,0.0016340149,0.044215176,0.00006968748,0.000071006056,0.000076585064,0.00013034815,0.000034776003,0.0030156919],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994473,0.00017086843,0.000030721654,0.00010988866,0.00016819853,0.00007300321],"domain_scores_gemma":[0.99956197,0.00023817588,0.00005359604,0.000019442547,0.00011098698,0.00001583148],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007900447,0.0006547109,0.0009222053,0.0006388513,0.00031371485,0.0011048634,0.0006954412,0.0005631979,0.000989377],"category_scores_gemma":[0.0014726123,0.00039763385,0.0006262413,0.0010791683,0.00033153233,0.0011515805,0.00034963555,0.00068370166,0.00012527681],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018197705,0.00002365185,0.0005327946,0.000048923015,0.000027830152,0.000018474248,0.000014402613,0.97610587,0.00032433198,0.0042053773,0.00035836123,0.018321728],"study_design_scores_gemma":[0.0000011671796,0.000003887246,0.00008866183,0.000001638929,0.0000030995848,0.0000016325145,0.000002283416,0.9990343,0.000081427665,0.0007011933,0.00007930174,0.0000014753886],"about_ca_topic_score_codex":0.015771728,"about_ca_topic_score_gemma":0.006900377,"teacher_disagreement_score":0.015771728,"about_ca_system_score_codex":0.0012932232,"about_ca_system_score_gemma":0.0013710383,"threshold_uncertainty_score":0.03135985},"labels":[],"label_agreement":null},{"id":"W4409787756","doi":"10.61091/jcmcc127a-505","title":"Neural Network-based Market Fluctuation Prediction Model Construction and Corporate Strategy Research in Business Administration","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Artificial neural network; Business; Administration (probate law); Computer science; Econometrics; Artificial intelligence; Economics; Political science","score_opus":0.04660420594970642,"score_gpt":0.2996737666942092,"score_spread":0.25306956074450276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409787756","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.053776268,0.0008322389,0.9406095,0.00039425716,0.00006330437,0.000044636115,0.00009131578,0.0003965003,0.0037920293],"genre_scores_gemma":[0.91716295,0.0011751063,0.07749527,0.00008087267,0.00007041325,0.00016546396,0.00028448834,0.000044474178,0.0035208873],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995161,0.000146577,0.000040947743,0.0001241623,0.00012578857,0.000046307305],"domain_scores_gemma":[0.99963534,0.00016680245,0.000045621735,0.00001902165,0.000116548414,0.000016608408],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00087592413,0.00062578195,0.00066940987,0.0010190173,0.0003408083,0.0011178033,0.00094166765,0.0006796107,0.0012961784],"category_scores_gemma":[0.0021195768,0.00033039297,0.0007163699,0.0012177507,0.00037644978,0.0016491895,0.0005032135,0.0008058962,0.0002489397],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003428064,0.000057641104,0.004470342,0.00007742019,0.00009701188,0.00007681095,0.0000657745,0.8893471,0.0011728167,0.016356155,0.0010111402,0.08723353],"study_design_scores_gemma":[0.0000010973004,0.0000049690516,0.00025567,0.0000024561036,0.0000053448553,0.0000040267937,0.000003194766,0.9979315,0.00011818945,0.0015239747,0.00014713094,0.00000257042],"about_ca_topic_score_codex":0.019189687,"about_ca_topic_score_gemma":0.009881903,"teacher_disagreement_score":0.019189687,"about_ca_system_score_codex":0.0010728902,"about_ca_system_score_gemma":0.0012043024,"threshold_uncertainty_score":0.038155973},"labels":[],"label_agreement":null},{"id":"W4409791059","doi":"10.61091/jcmcc127a-417","title":"Study on determining the weights of risk assessment indexes based on AHP hierarchical analysis for barracks facilities construction units in highland and alpine areas","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Analytic hierarchy process; Environmental science; Risk analysis (engineering); Geography; Computer science; Engineering; Operations research; Business","score_opus":0.019519736827181847,"score_gpt":0.28399694941545817,"score_spread":0.26447721258827633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409791059","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5037106,0.00055597525,0.48533544,0.0003967166,0.000051842733,0.00047373952,0.0002202545,0.00017525873,0.009080199],"genre_scores_gemma":[0.9413424,0.00024259655,0.057283156,0.00002199868,0.000015811545,0.00015313292,0.00014022694,0.000014437204,0.00078625727],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9961092,0.0013650286,0.00028945346,0.00031583486,0.0015330979,0.0003873097],"domain_scores_gemma":[0.9956197,0.0021548094,0.0004544226,0.00015354391,0.0014312612,0.00018625686],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0051028267,0.0007791125,0.00056776084,0.004217558,0.0011486062,0.0022813408,0.0007048213,0.00047233165,0.0013163559],"category_scores_gemma":[0.01184498,0.0003967028,0.0010838556,0.0032592276,0.00059493195,0.0019022912,0.001238197,0.0006720597,0.000079377256],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000508811,0.0004527824,0.09727998,0.0009972529,0.00058965216,0.00081680575,0.0048477245,0.52111566,0.012709577,0.0416519,0.002846675,0.3161833],"study_design_scores_gemma":[0.00003151751,0.00016044777,0.020597238,0.00009180253,0.00014591544,0.00009002399,0.0024292078,0.96214396,0.0029236537,0.009777508,0.0015557297,0.00005299606],"about_ca_topic_score_codex":0.018120024,"about_ca_topic_score_gemma":0.01130444,"teacher_disagreement_score":0.018120024,"about_ca_system_score_codex":0.0018931474,"about_ca_system_score_gemma":0.0025903806,"threshold_uncertainty_score":0.0360291},"labels":[],"label_agreement":null},{"id":"W4409791071","doi":"10.61091/jcmcc127a-466","title":"A Study of the Real-Time Impact of Economic Policies on Financial Market Liquidity Based on Time Series Analysis Methods","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Market liquidity; Series (stratigraphy); Time series; Finance; Financial market; Economics; Financial system; Business; Mathematics; Statistics","score_opus":0.014929887563164395,"score_gpt":0.31716038147903886,"score_spread":0.3022304939158745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409791071","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63559747,0.0031845812,0.35161442,0.0010445988,0.00009611752,0.000077182296,0.00040677763,0.00023606501,0.007742688],"genre_scores_gemma":[0.98774695,0.0009659276,0.010351478,0.000033980425,0.00006615374,0.00004770386,0.00014990408,0.000010541754,0.0006272934],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99940157,0.00028235352,0.000040012495,0.00008450514,0.00013848951,0.000053075375],"domain_scores_gemma":[0.9962824,0.002870289,0.0005054556,0.00008488584,0.00020441778,0.000052566316],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014633698,0.00041002434,0.00046755417,0.0016562964,0.00023514254,0.0010514461,0.0003798192,0.0005409466,0.0012215205],"category_scores_gemma":[0.008301128,0.0001407805,0.0005475983,0.0015360548,0.00035073655,0.0016478617,0.00041709325,0.0005341361,0.00008386894],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003363781,0.000346908,0.12783733,0.00061365624,0.0009423985,0.0014921003,0.0008308603,0.5655336,0.009402588,0.11140746,0.0020353983,0.17922132],"study_design_scores_gemma":[0.000007983968,0.00007350567,0.014336158,0.000026384,0.00005790522,0.00007901258,0.00014606823,0.9762413,0.00082893606,0.007575257,0.00060458726,0.000022967672],"about_ca_topic_score_codex":0.0028629357,"about_ca_topic_score_gemma":0.001165642,"teacher_disagreement_score":0.0028629357,"about_ca_system_score_codex":0.00037552914,"about_ca_system_score_gemma":0.0005334314,"threshold_uncertainty_score":0.0077391267},"labels":[],"label_agreement":null},{"id":"W4409848911","doi":"10.63689/2993-7159.1271","title":"A Comprehensive Intelligent Traffic Monitoring System Based on a Novel Integration of Neutrosophic Multi-Criteria Decision-Making Techniques","year":2025,"lang":"en","type":"article","venue":"Neutrosophic Systems with Applications","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Artificial intelligence; Systems engineering; Data mining; Engineering","score_opus":0.03643172419847484,"score_gpt":0.31658452681978433,"score_spread":0.2801528026213095,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409848911","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02413333,0.0001402212,0.9723545,0.00009471288,0.000042891217,0.00015243425,0.000058069123,0.00046698828,0.0025568623],"genre_scores_gemma":[0.5842214,0.00018173126,0.41358405,0.00009940384,0.000035171262,0.0003114207,0.00014001729,0.000021251108,0.0014055404],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938536,0.000123387,0.000052086198,0.0001552298,0.00022636888,0.00005760129],"domain_scores_gemma":[0.9996661,0.00009880618,0.0000499202,0.000021677675,0.00013229989,0.00003124361],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00091650366,0.00091409055,0.0010493526,0.0011355489,0.0007040201,0.0013314271,0.0010981618,0.0008896031,0.0011038092],"category_scores_gemma":[0.0010825667,0.00039956052,0.00079689396,0.0008156061,0.00032708375,0.0011057552,0.0009171412,0.00077314686,0.00019068859],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004131596,0.0004279537,0.0027664755,0.00047560415,0.00028858514,0.00061841344,0.00038015904,0.5890505,0.06093177,0.01765169,0.0025740773,0.32442158],"study_design_scores_gemma":[0.000016464144,0.00010873966,0.00035067112,0.000013533429,0.000034320703,0.000063816995,0.000021696058,0.9933565,0.0026854384,0.0022040005,0.0011260785,0.000018642802],"about_ca_topic_score_codex":0.0025381276,"about_ca_topic_score_gemma":0.0025711432,"teacher_disagreement_score":0.0025381276,"about_ca_system_score_codex":0.0006618756,"about_ca_system_score_gemma":0.0010675167,"threshold_uncertainty_score":0.0050467253},"labels":[],"label_agreement":null},{"id":"W4411656688","doi":"10.51847/ljgakzxujw","title":"10.51847/LJgaKZxUJW","year":2000,"lang":"en","type":"article","venue":"Time to knit","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Risk management; Power station; Risk analysis (engineering); Reliability engineering; Engineering; Computer science; Operations management; Business; Electrical engineering; Finance","score_opus":0.009179281395000754,"score_gpt":0.18676192381201231,"score_spread":0.17758264241701155,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411656688","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008813385,0.002108405,0.013267776,0.0025205081,0.0013680509,0.00025760918,0.0033154464,0.0039434247,0.96440536],"genre_scores_gemma":[0.017878525,0.0013016718,0.0059298323,0.00055818463,0.0001618804,0.00017808592,0.0019481906,0.0006503833,0.9713932],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99974304,0.000033510893,0.000026665617,0.000085488966,0.00006688754,0.000044412085],"domain_scores_gemma":[0.9995122,0.00013598677,0.000050709445,0.00008151091,0.00012527475,0.00009436837],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0005340926,0.001229609,0.0008463604,0.0015751537,0.0009024032,0.003091183,0.0010182657,0.0026606761,0.9016586],"category_scores_gemma":[0.0011858371,0.0004168168,0.0004318243,0.002270755,0.0007509478,0.0028402142,0.0012824922,0.0010656639,0.89771587],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036702133,0.00031202135,0.001731002,0.0008776944,0.00003580547,0.0004440412,0.00016720766,0.0014765598,0.0046750316,0.019248044,0.21955162,0.751114],"study_design_scores_gemma":[0.0000730182,0.0001083219,0.0019226902,0.00032654716,0.000025099385,0.0006495683,0.00024815378,0.0026080434,0.0010827744,0.0064014234,0.9865166,0.000037891532],"about_ca_topic_score_codex":0.0022961502,"about_ca_topic_score_gemma":0.0015594206,"teacher_disagreement_score":0.098341405,"about_ca_system_score_codex":0.0006171677,"about_ca_system_score_gemma":0.00041987817,"threshold_uncertainty_score":0.14027208},"labels":[],"label_agreement":null},{"id":"W4414148158","doi":"10.5539/jel.v15n1p151","title":"Model Development for Internal Quality Assurance in Guangxi Vocational Colleges","year":2025,"lang":"en","type":"article","venue":"Journal of Education and Learning","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Mahasarakham University","keywords":"Vocational education; Quality assurance; Quality (philosophy); Key (lock); Higher education; Measure (data warehouse)","score_opus":0.040680371092620134,"score_gpt":0.36171056264249624,"score_spread":0.3210301915498761,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414148158","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17120068,0.00047579798,0.79603595,0.0010741155,0.00005539806,0.001241839,0.00046701144,0.00079017365,0.02865904],"genre_scores_gemma":[0.7595151,0.00040337478,0.2342834,0.00006397404,0.000011936347,0.0015829303,0.0005350426,0.00004345783,0.0035608327],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979767,0.00125198,0.00009486953,0.00018822312,0.00034227653,0.0001460129],"domain_scores_gemma":[0.9976629,0.0014367666,0.00020026811,0.00008279027,0.0005559684,0.000061324514],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040543783,0.00070620433,0.0005412777,0.0016154705,0.00078973843,0.0021500406,0.0014634451,0.0008751809,0.0032040896],"category_scores_gemma":[0.0068053594,0.00042203875,0.0011803545,0.001395275,0.0005413967,0.0014025391,0.0014629373,0.0008578226,0.00029888167],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009752793,0.00015207265,0.011006367,0.00033866416,0.00007522925,0.00015685568,0.001284185,0.8910476,0.00092700805,0.046684667,0.0011945823,0.04703525],"study_design_scores_gemma":[0.000020278803,0.000065493245,0.0012858983,0.000058778467,0.000018994879,0.00001583139,0.00029799595,0.9901106,0.00027333992,0.006119366,0.0017218236,0.000011550019],"about_ca_topic_score_codex":0.038528454,"about_ca_topic_score_gemma":0.030112306,"teacher_disagreement_score":0.038528454,"about_ca_system_score_codex":0.0041651265,"about_ca_system_score_gemma":0.006823596,"threshold_uncertainty_score":0.07660836},"labels":[],"label_agreement":null},{"id":"W4414860366","doi":"10.1139/cjce-2025-0189","title":"Integrated optimization of metro and bridging bus operation under metro disruption","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Natural Science Foundation of Hunan Province; National Natural Science Foundation of China","keywords":"Bridging (networking); Headway; Service (business); Cost reduction; Train; Linear programming; Total cost; Public transport","score_opus":0.010698860518051878,"score_gpt":0.21682273657049547,"score_spread":0.2061238760524436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414860366","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5116111,0.00055855745,0.4670599,0.00039993558,0.000081346894,0.00018922209,0.00032087968,0.0006077545,0.019171359],"genre_scores_gemma":[0.9827192,0.00010683593,0.014654688,0.000025014957,0.0000090904205,0.00006470201,0.000112345784,0.000037571135,0.002270507],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995844,0.000111191075,0.000012069072,0.00008165957,0.00008108415,0.00012972097],"domain_scores_gemma":[0.9996809,0.00012989073,0.000053177264,0.000018765128,0.00006211955,0.000055254644],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007523513,0.0012508103,0.0012021322,0.00055835303,0.0005229149,0.0012891577,0.001010996,0.0010365488,0.0020143192],"category_scores_gemma":[0.0011230224,0.00059462077,0.000644581,0.0006848726,0.00047004528,0.0009338106,0.00094335986,0.0008174193,0.00016854826],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026552012,0.000024802172,0.00031914737,0.000010423672,0.000009140321,0.000023794873,0.000009421064,0.9961856,0.00028426733,0.0003848118,0.000113955255,0.0026080278],"study_design_scores_gemma":[0.0000040808886,0.000027588814,0.00016388047,9.553466e-7,0.0000046013292,0.000004037409,0.000015983313,0.99941576,0.000105832994,0.00016582535,0.00008980755,0.0000017100324],"about_ca_topic_score_codex":0.0236629,"about_ca_topic_score_gemma":0.019696757,"teacher_disagreement_score":0.0236629,"about_ca_system_score_codex":0.0012138012,"about_ca_system_score_gemma":0.0016804594,"threshold_uncertainty_score":0.047050297},"labels":[],"label_agreement":null},{"id":"W7117242944","doi":"10.5267/j.ijiec.2025.9.006","title":"Engineering supply chain quality control under different information conditions","year":2025,"lang":"","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"North China University of Water Resources and Electric Power","keywords":"Lagrange multiplier; Quality (philosophy); Complete information; Control (management); Supply chain; Optimal control; Function (biology); Value of information; Multiplier (economics)","score_opus":0.031953272306371516,"score_gpt":0.30550064808040517,"score_spread":0.27354737577403365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7117242944","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7295073,0.00061024236,0.26256025,0.00036885968,0.00003237017,0.00013222436,0.00011310395,0.00013158093,0.006544077],"genre_scores_gemma":[0.99753976,0.000060005226,0.002163553,0.0000062467334,0.0000031447987,0.00001470964,0.000020887483,0.0000021288636,0.00018951217],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972783,0.00078511966,0.00013062773,0.00046332448,0.00071737904,0.00062529393],"domain_scores_gemma":[0.9922329,0.0042436398,0.0014855321,0.00039561823,0.0014439537,0.00019830438],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037243953,0.0007818286,0.0010067131,0.0007986778,0.0006486038,0.0018630347,0.0008691789,0.000940947,0.0009203974],"category_scores_gemma":[0.010245517,0.00032324536,0.00077370997,0.00080242724,0.0010931867,0.0024724703,0.001026408,0.0009040126,0.00006402477],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027193074,0.00008157097,0.0013138299,0.00008830808,0.000030876723,0.00009081529,0.000079942074,0.9841451,0.0017345141,0.004959191,0.00011052362,0.00709344],"study_design_scores_gemma":[0.00002603417,0.000096232456,0.0009124989,0.0000056730737,0.00002298303,0.000008869599,0.00004826313,0.99543023,0.0013563869,0.0020329608,0.00004819391,0.000011669981],"about_ca_topic_score_codex":0.011314447,"about_ca_topic_score_gemma":0.004087431,"teacher_disagreement_score":0.011314447,"about_ca_system_score_codex":0.002153742,"about_ca_system_score_gemma":0.0015195104,"threshold_uncertainty_score":0.022497177},"labels":[],"label_agreement":null}]}