{"meta":{"query_hash":"d5baabfe471f","filters":{"topic":"Life Cycle Costing Analysis"},"cohort_total":133,"direct_labels_cover":0,"predictions_cover":133,"exported":133,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/d5baabfe471f","api":"https://metacan.xera.ac/api/v1/cohort?topic=Life+Cycle+Costing+Analysis"},"results":[{"id":"W1548032922","doi":"","title":"DETERMINING IT TCO: LESSONS AND EXTENSIONS","year":2001,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Total cost of ownership; Extant taxon; Externality; Business; Total cost; Risk analysis (engineering); Cost accounting; Industrial organization; Environmental economics; Computer science; Economics; Microeconomics; Accounting","score_opus":0.05730832001263115,"score_gpt":0.27670753436837164,"score_spread":0.2193992143557405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1548032922","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85669434,0.00003692373,0.0010751133,0.012645681,0.00011168084,0.000054655888,2.4284356e-7,0.00022899314,0.12915236],"genre_scores_gemma":[0.9896189,0.000021213822,0.00050093036,0.0061045745,0.00046328414,0.000003910133,0.0000038489734,0.000015225439,0.003268104],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99930316,0.0000032064981,0.00014925565,0.00022229752,0.00011876879,0.0002032878],"domain_scores_gemma":[0.9995877,0.00006229944,0.00006865242,0.00018826875,0.000079526304,0.000013550301],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017297032,0.0001011081,0.00013087051,0.00017289097,0.00023290333,0.00026385856,0.00010067523,0.000033153432,0.00039199798],"category_scores_gemma":[0.00028411835,0.00008704757,0.00004427115,0.00037153464,0.000031052383,0.00051921635,0.00016945651,0.000065067536,0.00032969305],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001352332,0.00010155274,0.7718266,0.0000648484,0.00010343782,0.00018804077,0.0001122905,0.00014708328,0.0020194496,0.013323667,0.05756364,0.15453584],"study_design_scores_gemma":[0.001098917,0.000009983416,0.32065913,0.00017294075,0.0005197864,0.000057279154,0.0024559107,0.1256659,0.000058489873,0.004423525,0.5439084,0.00096970686],"about_ca_topic_score_codex":0.00040456088,"about_ca_topic_score_gemma":0.0003155321,"teacher_disagreement_score":0.48634478,"about_ca_system_score_codex":0.000006749516,"about_ca_system_score_gemma":0.0000049717955,"threshold_uncertainty_score":0.4292103},"labels":[],"label_agreement":null},{"id":"W16911692","doi":"10.1111/j.1440-1746.2006.04465.x","title":"SCSI Guide to Life Cycle Costing","year":2011,"lang":"en","type":"article","venue":"Journal of Gastroenterology and Hepatology","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Technological University Dublin; Concordia University","keywords":"Computer science","score_opus":0.023051881290865092,"score_gpt":0.23962427988290755,"score_spread":0.21657239859204247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W16911692","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99030685,0.00006208971,0.0026082913,0.0037109046,0.0004766482,0.00004993783,5.722873e-7,0.000023858165,0.002760835],"genre_scores_gemma":[0.98144644,0.000015047046,0.0027580932,0.015042839,0.00069117686,0.0000020210973,8.8786464e-7,0.0000148982435,0.000028588165],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99867135,0.000046076682,0.00062383834,0.0001826439,0.000114343915,0.00036175447],"domain_scores_gemma":[0.9988525,0.000053073367,0.0005899397,0.00013995945,0.00029793294,0.00006663221],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068392867,0.00014533017,0.0004790392,0.0005178749,0.00012399085,0.000036327874,0.00027424897,0.00008607951,0.00017820536],"category_scores_gemma":[0.0007547816,0.00012737357,0.000107993445,0.00016585163,0.000102498874,0.00037729097,0.0002000487,0.00024467698,0.000067734916],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005645613,0.00006358989,0.99062335,0.000019659676,0.00012944572,0.00011858774,0.00007596588,0.000020682679,0.00008703577,0.00056888605,0.006784152,0.00094408967],"study_design_scores_gemma":[0.0033095276,0.0009619847,0.95197767,0.000109821216,0.0007940137,0.0012895375,0.0006063518,0.003314125,0.00004549795,0.0033629534,0.03389553,0.00033299244],"about_ca_topic_score_codex":0.00020398112,"about_ca_topic_score_gemma":0.00027408794,"teacher_disagreement_score":0.03864568,"about_ca_system_score_codex":0.000017180302,"about_ca_system_score_gemma":0.000022031518,"threshold_uncertainty_score":0.5194143},"labels":[],"label_agreement":null},{"id":"W1794669717","doi":"10.5430/jha.v4n4p92","title":"A life-cycle cost analysis for flooring materials for healthcare facilities","year":2015,"lang":"en","type":"article","venue":"Journal of Hospital Administration","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Total cost of ownership; Operations management; Business; Return on investment; Health care; Sustainability; Investment (military); Risk analysis (engineering); Engineering; Production (economics); Accounting","score_opus":0.050978105146510355,"score_gpt":0.2926560065276225,"score_spread":0.24167790138111217,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1794669717","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9779537,0.000089576075,0.014215703,0.0061650467,0.0009405757,0.00040704323,0.00006391103,0.00003053804,0.00013391035],"genre_scores_gemma":[0.9953649,0.000003194664,0.0013663794,0.0003187575,0.002685306,0.000041376832,0.00008883573,0.000016863425,0.00011438523],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984931,0.000013111435,0.0007282134,0.00016019154,0.00038984756,0.00021557303],"domain_scores_gemma":[0.9969112,0.000084407926,0.0009687878,0.0001308349,0.001830872,0.00007389064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012772448,0.00014231095,0.0004197666,0.00037327953,0.0001346674,0.00048950815,0.00017645065,0.00006380368,0.000019885187],"category_scores_gemma":[0.0032847265,0.00012803546,0.00030575655,0.0004017099,0.000022982998,0.0011621163,0.000026854392,0.00006052377,0.000008081922],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.010804166,0.004991561,0.717639,0.007989898,0.01705181,0.00013005282,0.0061755464,0.032907117,0.0029432618,0.04830456,0.1283524,0.022710608],"study_design_scores_gemma":[0.041237768,0.031420294,0.14865038,0.0016321735,0.042202353,0.00007668575,0.102609135,0.16299573,0.023361938,0.13154237,0.3056751,0.0085960785],"about_ca_topic_score_codex":0.0001237345,"about_ca_topic_score_gemma":0.000116375944,"teacher_disagreement_score":0.5689886,"about_ca_system_score_codex":0.000100549136,"about_ca_system_score_gemma":0.00023931722,"threshold_uncertainty_score":0.52211344},"labels":[],"label_agreement":null},{"id":"W1814887519","doi":"","title":"Total Cost of Ownership -Revealing the true cost of owning and operating equipment","year":2008,"lang":"en","type":"article","venue":"Lund University Publications Student Papers (Lund University)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Total cost of ownership; Total cost; Service (business); Order (exchange); Operations management; Operations research; Engineering; Business; Marketing; Accounting; Finance","score_opus":0.02991440632706478,"score_gpt":0.21644415596089472,"score_spread":0.18652974963382996,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1814887519","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27221683,0.000026417532,0.0008002174,0.0016848673,0.00006366673,0.0004574387,0.000016434728,0.000084289066,0.72464985],"genre_scores_gemma":[0.8390417,0.00008250491,0.00040097113,0.00021494976,0.00011535156,0.0000010823876,0.000065994864,0.000021195474,0.16005623],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985757,0.0000644024,0.000261546,0.00038826623,0.00040478772,0.000305308],"domain_scores_gemma":[0.9983932,0.00020759896,0.00046622267,0.00042764342,0.0004546048,0.000050763727],"candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.00034263273,0.0002015229,0.00031522504,0.00081869314,0.0013032053,0.0001116718,0.0007306462,0.00008026263,0.00009189677],"category_scores_gemma":[0.00014330645,0.00019371965,0.00014827758,0.0020589535,0.00038777,0.0011436364,0.00070548867,0.00019647101,0.000006535946],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051935178,0.00035985647,0.11498162,0.00011113157,0.0006164412,0.000025595396,0.0020009216,0.00440171,0.0013192241,0.87460315,0.00070499507,0.00082339],"study_design_scores_gemma":[0.0016259603,0.000025472431,0.049403355,0.00006120789,0.0010304536,0.000007721507,0.034986883,0.0025891587,0.00005114776,0.0000138917685,0.9097892,0.0004155158],"about_ca_topic_score_codex":0.0009878412,"about_ca_topic_score_gemma":0.00028222508,"teacher_disagreement_score":0.90908426,"about_ca_system_score_codex":0.00021148237,"about_ca_system_score_gemma":0.00009119134,"threshold_uncertainty_score":0.99999696},"labels":[],"label_agreement":null},{"id":"W1934592853","doi":"10.1061/9780784479360.142","title":"Oil and Gas Pipeline Technology Finds Uses in the Water and Wastewater Industry","year":2015,"lang":"en","type":"article","venue":"Pipelines 2015","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Wastewater; Pipeline (software); Petroleum engineering; Petroleum industry; Gas industry; Pipeline transport; Environmental science; Waste management; Fossil fuel; Computer science; Environmental engineering; Engineering; Natural gas; Operating system","score_opus":0.03491720452046322,"score_gpt":0.2561352091093385,"score_spread":0.2212180045888753,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1934592853","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9300686,0.00037602044,0.000011906921,0.06712576,0.00013588885,0.00003451252,0.0000013934185,0.00008894564,0.0021569757],"genre_scores_gemma":[0.9927879,0.000041600197,0.00014392928,0.0020046316,0.001147089,0.000018984361,0.000028660568,0.000024826859,0.00380236],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99886626,0.000022752902,0.0002901539,0.00029187428,0.00021035361,0.00031863188],"domain_scores_gemma":[0.9993775,0.000039157396,0.00007765392,0.00029686565,0.00018758564,0.000021272848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090686185,0.00018758255,0.00022936522,0.00034061706,0.00007690136,0.00024181117,0.00025382728,0.00021300101,0.00002615243],"category_scores_gemma":[0.00046885948,0.00009575098,0.000023578497,0.0004474595,0.00013060901,0.0004444134,0.0003453157,0.00033205716,0.00011764881],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010663644,0.00022758276,0.76125586,0.00025539534,0.000057272475,0.000115374,0.0012143616,0.00022158964,0.001367135,0.0008633659,0.14378496,0.090530455],"study_design_scores_gemma":[0.00359723,0.000033326618,0.005906183,0.00020130209,0.00036525395,0.000100639976,0.00812923,0.02201071,0.00090558163,0.014967612,0.94274086,0.0010420532],"about_ca_topic_score_codex":0.0004852621,"about_ca_topic_score_gemma":0.00020614287,"teacher_disagreement_score":0.7989559,"about_ca_system_score_codex":0.000011881161,"about_ca_system_score_gemma":0.000011034182,"threshold_uncertainty_score":0.39046115},"labels":[],"label_agreement":null},{"id":"W196461752","doi":"10.5006/c2000-00282","title":"Monitoring Corrosion in Aging Systems - New Possibilities and Old Fundamentals","year":2000,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Royal Military College of Canada","funders":"","keywords":"Corrosion; Materials science; Metallurgy; Forensic engineering; Engineering","score_opus":0.022192292252824986,"score_gpt":0.23624584316363353,"score_spread":0.21405355091080855,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W196461752","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9891962,0.00056956,0.000024638852,0.00020444996,0.00021106454,0.00010434506,2.3758659e-7,0.0001342683,0.009555252],"genre_scores_gemma":[0.9811408,0.000030225598,0.000059075923,0.00018721353,0.0008597384,0.000004534238,0.0000024687072,0.00001506701,0.017700888],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991057,0.000008213999,0.00025281488,0.00024842768,0.0001662527,0.00021857346],"domain_scores_gemma":[0.99969923,0.00004342578,0.000060673545,0.00016021068,0.000020951486,0.000015483954],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025048165,0.00012183681,0.0001753476,0.00020846882,0.00010198821,0.00062402996,0.0000980718,0.000034003024,0.00028102784],"category_scores_gemma":[0.0000374624,0.000110409725,0.000031109535,0.00034462183,0.000019062421,0.000889246,0.00006820137,0.00007265016,0.00012720755],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009039534,0.00001864496,0.96854854,0.00010643828,0.0000070660217,0.0000061543597,0.0002327239,0.0006157638,0.0007890964,0.00025240172,0.00040941784,0.029004695],"study_design_scores_gemma":[0.004291274,0.000034234377,0.8030115,0.0036219407,0.0003103429,0.000015550808,0.029711287,0.13884646,0.0014216477,0.0022352296,0.014471234,0.0020293475],"about_ca_topic_score_codex":0.024591831,"about_ca_topic_score_gemma":0.00011120648,"teacher_disagreement_score":0.1655371,"about_ca_system_score_codex":0.000044306766,"about_ca_system_score_gemma":0.0000063307843,"threshold_uncertainty_score":0.9819035},"labels":[],"label_agreement":null},{"id":"W1970328664","doi":"10.3763/inbi.2009.si05/splitsection5","title":"The CABA Building Intelligence Quotient programme","year":2009,"lang":"en","type":"article","venue":"Intelligent Buildings International","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Structural Genomics Consortium","funders":"","keywords":"Building automation; Automation; Knowledge management; Engineering; Computer science; Collective intelligence; Web intelligence; Data science; Artificial intelligence; The Internet; World Wide Web","score_opus":0.026857658156083306,"score_gpt":0.27275511356523724,"score_spread":0.24589745540915392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1970328664","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5575287,0.0012874433,0.26023662,0.07467863,0.012120376,0.0014760736,0.000009727169,0.0019239915,0.090738475],"genre_scores_gemma":[0.99074566,0.00008435938,0.0022292598,0.0033950398,0.002537054,0.000029273508,0.000020586156,0.00003102512,0.000927737],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972322,0.000013308838,0.00069576764,0.00053969724,0.0008847145,0.0006343107],"domain_scores_gemma":[0.99827486,0.00020086009,0.0004451975,0.0004035267,0.00063458853,0.000040977517],"candidate_categories":["scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0009798324,0.0003082749,0.00020837286,0.00040218612,0.0005445715,0.001583991,0.0015728961,0.000080488484,0.00022842799],"category_scores_gemma":[0.0014474863,0.00023708874,0.00027875154,0.00072016194,0.00014533223,0.0008233802,0.00031222944,0.00033207968,0.0005450654],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060569662,0.00018724066,0.0070527634,0.000010129047,0.0001561794,0.000018097595,0.00008511561,0.0018910497,0.00072662835,0.44309425,0.006825826,0.53989214],"study_design_scores_gemma":[0.00015893368,0.00003246051,0.0017359683,0.00013029447,0.00008791915,0.000018508186,0.00047426767,0.042958613,0.0039114994,0.05688932,0.89305025,0.0005519565],"about_ca_topic_score_codex":0.00038689066,"about_ca_topic_score_gemma":0.000044210436,"teacher_disagreement_score":0.88622445,"about_ca_system_score_codex":0.00023767981,"about_ca_system_score_gemma":0.000027546497,"threshold_uncertainty_score":0.9994525},"labels":[],"label_agreement":null},{"id":"W1974368920","doi":"10.1007/s00158-006-0026-x","title":"Cost-based, integrated design optimization","year":2006,"lang":"en","type":"article","venue":"Structural and Multidisciplinary Optimization","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Engineering design process; Computer-automated design; Probabilistic design; Systems engineering; Design for X; Product design; Computer science; Engineering optimization; Process (computing); Design process; Iterative design; Manufacturing engineering; Design methods; Design technology; Engineering; Industrial engineering; Work in process; Product (mathematics); Optimization problem; Mechanical engineering; Operations management","score_opus":0.024719388959972378,"score_gpt":0.24604684131670831,"score_spread":0.22132745235673593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1974368920","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050700635,0.00008565481,0.9465655,0.0007002763,0.00029009554,0.00048449088,0.0000074881436,0.0003334925,0.0008323349],"genre_scores_gemma":[0.7882983,0.0000068616205,0.20942838,0.0001786515,0.0006356032,0.000032648917,0.0011618536,0.000039824678,0.0002178847],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988479,0.00002587384,0.0003136799,0.00037422893,0.00019046551,0.0002478473],"domain_scores_gemma":[0.99927133,0.0000480578,0.0002264034,0.00016357683,0.00027308794,0.000017515098],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000165171,0.0002393391,0.00019410282,0.000290016,0.00055680715,0.00032849086,0.00012314811,0.00009270862,0.00016171273],"category_scores_gemma":[0.000079355086,0.0001999921,0.000057047193,0.0006832693,0.00008156289,0.0010296075,0.00009580226,0.00009914648,0.00001170306],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000610484,0.00001537585,0.006535786,0.00003866629,0.000009188123,0.0000032682865,0.000012345197,0.99132925,0.000059791488,0.0003075753,0.00029512114,0.0013325523],"study_design_scores_gemma":[0.0006902562,0.000010509191,0.0042737187,0.00002910622,0.0001327404,0.0000025227946,0.000090485766,0.9938847,0.000051723004,0.00046947686,0.000089859874,0.0002749297],"about_ca_topic_score_codex":0.00044404497,"about_ca_topic_score_gemma":0.000028800654,"teacher_disagreement_score":0.73759764,"about_ca_system_score_codex":0.000046790752,"about_ca_system_score_gemma":0.000022031527,"threshold_uncertainty_score":0.8155441},"labels":[],"label_agreement":null},{"id":"W1977287090","doi":"10.1016/s0019-0578(99)00039-7","title":"Process control reliability: the key to investing in your infrastructure","year":2000,"lang":"en","type":"article","venue":"ISA Transactions","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Weyerhauser (Canada)","funders":"","keywords":"Life cycle costing; Key (lock); Reliability (semiconductor); Control (management); Activity-based costing; Process (computing); Process management; Computer science; Engineering; Business; Reliability engineering; Operations management; Risk analysis (engineering); Marketing; Computer security","score_opus":0.012577418693776744,"score_gpt":0.23310525432112575,"score_spread":0.220527835627349,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1977287090","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97080207,0.000017672979,0.0051093367,0.0115993535,0.000131169,0.00035315208,0.0000059041645,0.0001913588,0.011789968],"genre_scores_gemma":[0.9941979,0.0000019438603,0.00014564824,0.0047586374,0.00036000533,0.00006519835,0.0000032799653,0.000020856598,0.00044653282],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9989304,0.000020723262,0.0002860112,0.0002783841,0.000211708,0.0002727935],"domain_scores_gemma":[0.99944305,0.000085570275,0.000057187128,0.00028910858,0.00010496513,0.000020112177],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0003265932,0.00014575382,0.00017312226,0.00018869841,0.00030717213,0.00019289262,0.00027173784,0.00005875005,0.0009988152],"category_scores_gemma":[0.00019858946,0.00011228687,0.000082359045,0.0013867447,0.000048162652,0.00057441165,0.0000046565215,0.00028501963,0.0002479922],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000877705,0.00013962788,0.08964134,0.00014284131,0.00007829261,0.000008845125,0.0027982215,0.8196597,0.00027198653,0.00011102437,0.0011432619,0.08591711],"study_design_scores_gemma":[0.0040667458,0.000034506775,0.47759458,0.00041950875,0.0010813905,0.000019197558,0.0062950873,0.25908393,0.00015497483,0.014558867,0.23503552,0.0016556873],"about_ca_topic_score_codex":0.0015590163,"about_ca_topic_score_gemma":0.00092538836,"teacher_disagreement_score":0.5605757,"about_ca_system_score_codex":0.00004188991,"about_ca_system_score_gemma":0.00002781055,"threshold_uncertainty_score":0.9999144},"labels":[],"label_agreement":null},{"id":"W1995810991","doi":"10.1016/s0019-0578(00)00005-7","title":"Foundation fieldbus economics comparison","year":2000,"lang":"en","type":"article","venue":"ISA Transactions","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Syncrude (Canada)","funders":"","keywords":"Foundation (evidence); FOUNDATION fieldbus; Fieldbus; Engineering; Computer science; Electrical engineering; Control system; Political science","score_opus":0.02501770087203712,"score_gpt":0.2357178774493627,"score_spread":0.2107001765773256,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1995810991","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7779069,0.000029847728,0.06028069,0.0034028066,0.0005635679,0.00015685045,0.000003043666,0.00040937233,0.15724693],"genre_scores_gemma":[0.99613106,0.000018807725,0.00027554735,0.0008530318,0.0004738055,0.000010689234,0.000026271431,0.0000133204,0.0021974416],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994311,0.0000043298874,0.00019964446,0.0001638117,0.000060997063,0.00014014351],"domain_scores_gemma":[0.99969625,0.000032485492,0.000054207376,0.00017063734,0.000037499372,0.000008939022],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00007773055,0.00008715582,0.00011876048,0.00011367073,0.00024406739,0.00021874157,0.00010727355,0.00004566955,0.009010572],"category_scores_gemma":[0.000008414986,0.00009589088,0.00009209314,0.0002422156,0.000022244749,0.0007254361,0.0000022611737,0.00010058457,0.0024820245],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035931487,0.00023891413,0.009773974,0.00004294608,0.00013835984,0.0000016253327,0.00019656052,0.08921,0.00005680695,0.001283476,0.002888536,0.8961329],"study_design_scores_gemma":[0.0006180605,0.000007263685,0.009776063,0.000020795202,0.0003566801,0.000002367341,0.00032213374,0.25829795,0.00010769603,0.0020309903,0.7280547,0.00040531953],"about_ca_topic_score_codex":0.0009185573,"about_ca_topic_score_gemma":0.0007146482,"teacher_disagreement_score":0.8957276,"about_ca_system_score_codex":0.000026292193,"about_ca_system_score_gemma":0.000008564163,"threshold_uncertainty_score":0.99829465},"labels":[],"label_agreement":null},{"id":"W1999867042","doi":"10.1139/l05-061","title":"Comparing life cycle implications of building retrofit and replacement options","year":2005,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":101,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Demolition; Retrofitting; Life-cycle assessment; Masonry; Engineering; Architectural engineering; Civil engineering; Environmental science","score_opus":0.015859640767350153,"score_gpt":0.20881921003822507,"score_spread":0.1929595692708749,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1999867042","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97789186,0.001117833,0.015240979,0.002465411,0.00018960435,0.00006678549,0.0000025390611,0.000026749727,0.0029982214],"genre_scores_gemma":[0.9973425,0.000012587756,0.0017663586,0.00016457756,0.00067757315,0.0000015802641,0.000001558625,0.000018741213,0.000014482158],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99913234,0.0000036456013,0.00042976433,0.00009977199,0.000113271475,0.00022123009],"domain_scores_gemma":[0.99920744,0.00003865725,0.00028186676,0.00015452209,0.00019959186,0.00011794626],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039450635,0.000101393016,0.00022799768,0.0006950102,0.00011178573,0.00011945908,0.00017966266,0.00003257999,0.00008277142],"category_scores_gemma":[0.00046325117,0.00011157773,0.00007488466,0.00039704354,0.000023301658,0.00053028343,0.000029205981,0.00015155306,0.000003248318],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000070213987,0.000017155468,0.27339607,0.0001716892,0.00022384671,0.0000068462587,0.00013418942,0.7022728,0.001864161,0.017074838,0.0031398598,0.0016915562],"study_design_scores_gemma":[0.0011967716,0.00002531957,0.41809025,0.0007235509,0.00049487886,0.000067921974,0.00028200864,0.52832836,0.00015756904,0.0006537491,0.04938558,0.00059403665],"about_ca_topic_score_codex":0.0014465617,"about_ca_topic_score_gemma":0.025958113,"teacher_disagreement_score":0.17394443,"about_ca_system_score_codex":0.000106981104,"about_ca_system_score_gemma":0.0000961284,"threshold_uncertainty_score":0.9918156},"labels":[],"label_agreement":null},{"id":"W2001481856","doi":"10.2514/6.2005-7438","title":"Development of a Precise Manufacturing Cost Model for the Optimisation of Aircraft Structures","year":2005,"lang":"en","type":"article","venue":"AIAA 5th ATIO and16th Lighter-Than-Air Sys Tech. and Balloon Systems Conferences","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Computer science; Manufacturing engineering; Systems engineering; Engineering","score_opus":0.041081015646351575,"score_gpt":0.25616070852580375,"score_spread":0.21507969287945217,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2001481856","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91203016,0.0006785081,0.083940916,0.00038383872,0.0002526594,0.0013498865,0.000022407921,0.00011877999,0.0012228672],"genre_scores_gemma":[0.99512964,0.000040296563,0.0038238317,0.00006907633,0.00039739205,0.0001773613,0.000044485354,0.000022628947,0.00029526395],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978821,0.000022451064,0.00093828124,0.00039969754,0.00045761853,0.000299852],"domain_scores_gemma":[0.9981565,0.00017966358,0.00092362316,0.00031604443,0.00039537833,0.000028816705],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00072508916,0.00030837688,0.0005456743,0.0003023731,0.00034502533,0.00024633267,0.00041430193,0.00013136407,0.000015361515],"category_scores_gemma":[0.00007852324,0.00020717495,0.00012359543,0.00020015669,0.00010529539,0.0006279563,0.00012951964,0.00009679514,0.000004299626],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012705638,0.00092598423,0.12626798,0.015926266,0.0043199407,0.0000050915887,0.01744718,0.1933805,0.02414407,0.061810635,0.005126029,0.5493757],"study_design_scores_gemma":[0.00195054,0.000053834072,0.016788347,0.001161384,0.00068167096,0.0000049240616,0.0045983633,0.92490464,0.027659288,0.00077632006,0.020510647,0.000910043],"about_ca_topic_score_codex":0.00051169435,"about_ca_topic_score_gemma":0.0005555623,"teacher_disagreement_score":0.7315241,"about_ca_system_score_codex":0.000034486427,"about_ca_system_score_gemma":0.000116939314,"threshold_uncertainty_score":0.8448349},"labels":[],"label_agreement":null},{"id":"W2008459439","doi":"10.1139/l04-077","title":"A method-based survey of life cycle costing literature pertinent to infrastructure design and renewal","year":2005,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Life cycle costing; Activity-based costing; Key (lock); Process (computing); Computer science; Risk analysis (engineering); Systems engineering; Engineering; Management science; Construction engineering; Business; Computer security","score_opus":0.012683092621760083,"score_gpt":0.20691885088884895,"score_spread":0.19423575826708886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2008459439","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7535097,0.0019527562,0.24162538,0.0018473284,0.00037986197,0.00021120462,0.000017204527,0.00004183596,0.0004147336],"genre_scores_gemma":[0.974627,0.0000028726558,0.024003174,0.00067330076,0.00064720865,0.0000013002165,0.0000049534483,0.000033125267,0.0000070538385],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99880946,0.00003472179,0.0004919419,0.00014856612,0.00020615765,0.000309174],"domain_scores_gemma":[0.9985531,0.0002266146,0.00029761152,0.00014585658,0.0005534462,0.00022334851],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014087217,0.0001827861,0.0003613019,0.0009816539,0.00007830943,0.00023837997,0.00023580811,0.000076299846,0.00006188371],"category_scores_gemma":[0.0034010825,0.00017565554,0.00007956376,0.00095474184,0.000014493144,0.00038155384,0.000024701301,0.00025103317,0.000001893203],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018387589,0.0000037830998,0.023671903,0.000095600524,0.00005375983,0.000017669603,0.00013102558,0.9710721,0.00045251922,0.000026457747,0.0012747898,0.0031820557],"study_design_scores_gemma":[0.00063907634,0.00002586667,0.15452442,0.00079214625,0.00011809052,0.00002282326,0.000038913273,0.8367548,0.00014186066,0.00004663158,0.0065372935,0.0003580533],"about_ca_topic_score_codex":0.004116091,"about_ca_topic_score_gemma":0.041392427,"teacher_disagreement_score":0.22111733,"about_ca_system_score_codex":0.000095083946,"about_ca_system_score_gemma":0.0002959325,"threshold_uncertainty_score":0.97609967},"labels":[],"label_agreement":null},{"id":"W2037273951","doi":"10.5539/mas.v8n1p104","title":"Selection of Non-Repairable Series Systems’ Components with Weibull-Life and Lognormal-Repair Distributions through Minimizing Expected Total Cost of Ownership Approach","year":2014,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Weibull distribution; Log-normal distribution; Reliability engineering; Series (stratigraphy); Statistics; Total cost; Purchasing; Computer science; Reliability (semiconductor); Mathematics; Econometrics; Mathematical optimization; Operations management; Economics; Engineering; Power (physics); Microeconomics","score_opus":0.02379594045138223,"score_gpt":0.21494962510829915,"score_spread":0.19115368465691693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2037273951","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72301525,0.000015066219,0.27083227,0.000038222777,0.000046504792,0.00032515186,0.000005132118,0.00014636922,0.0055760276],"genre_scores_gemma":[0.995251,0.0000010611375,0.004479423,0.00003545132,0.00009680486,0.00005301847,0.00003014628,0.000015114073,0.00003795773],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99822134,0.000015568356,0.00037782884,0.00048866455,0.00054047623,0.0003561536],"domain_scores_gemma":[0.9988431,0.000051982566,0.00044718778,0.0002959753,0.0003279303,0.000033857414],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00074529595,0.00018809058,0.00037361126,0.000211321,0.0004799814,0.00017121944,0.00026136683,0.000052136496,0.0000035631792],"category_scores_gemma":[0.00014557266,0.00015547211,0.00004814833,0.0014148807,0.0006145885,0.00096425274,0.00018313357,0.000105607396,0.0000029289515],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00070797966,0.0010274365,0.30093682,0.0029741188,0.00037846496,0.0000018528993,0.002137264,0.14466809,0.4992069,0.04637803,0.00059842144,0.0009846173],"study_design_scores_gemma":[0.0005178395,0.000020725454,0.020084761,0.00007035276,0.000103561564,0.000004882033,0.0009367878,0.9760594,0.0017600916,0.00013198698,0.00007671657,0.00023294151],"about_ca_topic_score_codex":0.0006684675,"about_ca_topic_score_gemma":0.000020442263,"teacher_disagreement_score":0.8313913,"about_ca_system_score_codex":0.00004781891,"about_ca_system_score_gemma":0.000053785057,"threshold_uncertainty_score":0.63399684},"labels":[],"label_agreement":null},{"id":"W2042554754","doi":"10.1121/1.3654765","title":"Noise surveys and hearing protection at the Royal Canadian Mint plant","year":2011,"lang":"en","type":"article","venue":"The Journal of the Acoustical Society of America","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Royal Canadian Mint (Canada)","funders":"","keywords":"Noise (video); Noise exposure; Environmental science; Hearing protection; Audiology; Hearing loss; Acoustics; Computer science; Medicine; Physics","score_opus":0.030117175559999865,"score_gpt":0.20573878383484634,"score_spread":0.17562160827484646,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2042554754","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94772565,0.00025720545,0.032545075,0.017052496,0.00043129685,0.0003317471,0.000009072183,0.000021228063,0.0016262238],"genre_scores_gemma":[0.9973678,0.000024540339,0.00057288806,0.0014895336,0.00041405682,0.000001097166,3.7888248e-7,0.0000115247485,0.00011816345],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990032,0.00012632785,0.00028706447,0.00007716684,0.0002932131,0.00021303743],"domain_scores_gemma":[0.9989663,0.00017630077,0.00044924422,0.00021601917,0.00015991984,0.00003223769],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022051167,0.00010265716,0.00018910861,0.000028734412,0.0005032937,0.000043460954,0.00040130535,0.00004000831,0.000083907755],"category_scores_gemma":[0.00039207004,0.000046731526,0.00020330667,0.00026328923,0.000379013,0.00010201854,0.00024020883,0.00031498595,0.000009310083],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00090069365,0.0007277771,0.32981178,0.0008588177,0.0044914344,0.000029123064,0.012471942,0.06280041,0.016414722,0.00008638918,0.32149193,0.24991499],"study_design_scores_gemma":[0.00055408257,0.00008339209,0.4436139,0.00018727419,0.0015380504,0.00005280115,0.0045077885,0.54060686,0.00036998992,0.0007723325,0.0074038715,0.00030970207],"about_ca_topic_score_codex":0.15292263,"about_ca_topic_score_gemma":0.003035992,"teacher_disagreement_score":0.47780642,"about_ca_system_score_codex":0.00007916171,"about_ca_system_score_gemma":0.000046789,"threshold_uncertainty_score":0.8527181},"labels":[],"label_agreement":null},{"id":"W2053614829","doi":"10.3763/asre.2005.4807","title":"Maintenance of Plastered and Painted Facades for Singapore Public Housing: A Predictive Life Cycle Cost-Based Approach","year":2005,"lang":"en","type":"article","venue":"Architectural Science Review","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Waterloo","keywords":"Order (exchange); High rise; Operations management; Engineering; Architectural engineering; Business; Structural engineering; Finance","score_opus":0.04307529215023818,"score_gpt":0.2720311848586469,"score_spread":0.22895589270840874,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2053614829","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8529483,0.014730942,0.08297101,0.039332863,0.00017109815,0.0051355967,0.000041643718,0.00047712342,0.004191417],"genre_scores_gemma":[0.9904859,0.00017679684,0.0053373263,0.0036835973,0.00018533894,0.00008465096,0.000016325735,0.000015743424,0.000014286087],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981156,0.0000288838,0.00043993414,0.0004976149,0.0004204834,0.00049749593],"domain_scores_gemma":[0.998687,0.00017415798,0.00045003448,0.00026150877,0.00036100252,0.00006628738],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015994626,0.00020076377,0.0004312428,0.00030433448,0.00031660078,0.00020776918,0.00049985835,0.00003082934,0.000017495178],"category_scores_gemma":[0.003672103,0.00014518121,0.0001384709,0.0014281638,0.0006468643,0.0007658845,0.00018054839,0.00013071428,0.000007410071],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009132169,0.00019543411,0.014739518,0.008742546,0.000085420514,0.0000012560387,0.00016212408,0.0053723613,0.001152616,0.002455808,0.0010196364,0.96598196],"study_design_scores_gemma":[0.0011608229,0.000052710184,0.008993316,0.0038829418,0.00033090496,0.000008995303,0.00019777138,0.9578388,0.00013871148,0.00046826777,0.026321642,0.0006051487],"about_ca_topic_score_codex":0.000056838326,"about_ca_topic_score_gemma":0.000026504718,"teacher_disagreement_score":0.9653768,"about_ca_system_score_codex":0.00005496422,"about_ca_system_score_gemma":0.0001129916,"threshold_uncertainty_score":0.5920318},"labels":[],"label_agreement":null},{"id":"W2055293293","doi":"10.4236/jtts.2015.52006","title":"Containerization of Grain: Emergence of a New Supply Chain Market","year":2015,"lang":"en","type":"article","venue":"Journal of Transportation Technologies","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Manitoba","funders":"","keywords":"Containerization; Supply chain; Business; Service (business); Supply and demand; Container (type theory); Industrial organization; Engineering; Economics; Marketing","score_opus":0.025737997906604637,"score_gpt":0.23663448777067836,"score_spread":0.21089648986407372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2055293293","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9778896,0.00053276296,0.016603358,0.003781622,0.00027619558,0.000119833,0.00000841827,0.0001336259,0.00065458624],"genre_scores_gemma":[0.9975086,0.00008110348,0.002204672,0.000035450874,0.00007456872,0.0000010878399,0.000012035336,0.0000090158,0.00007350442],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99875915,0.000006120627,0.0007137845,0.00008167024,0.00034392538,0.00009532797],"domain_scores_gemma":[0.9977927,0.0000234429,0.0013812938,0.00012878221,0.00066418585,0.000009562919],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048575873,0.000092234724,0.0002914272,0.00057445065,0.000018750861,0.000015351756,0.00027876077,0.000074622774,0.000053570413],"category_scores_gemma":[0.0006068626,0.00007882374,0.00011873523,0.0007521724,0.00006508626,0.00060076045,0.000008724017,0.00009625304,0.0000014003475],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004959297,0.00023457766,0.86253816,0.000555481,0.0003484264,0.000035982597,0.0009335234,0.004570325,0.016168742,0.011003938,0.06096595,0.042148948],"study_design_scores_gemma":[0.009590293,0.0007620597,0.65584785,0.0017751172,0.002469767,0.00001889117,0.08854997,0.011074914,0.095811166,0.097841,0.034873005,0.0013859384],"about_ca_topic_score_codex":0.00019977908,"about_ca_topic_score_gemma":0.00008365411,"teacher_disagreement_score":0.2066903,"about_ca_system_score_codex":0.000010460719,"about_ca_system_score_gemma":0.00005817611,"threshold_uncertainty_score":0.32143387},"labels":[],"label_agreement":null},{"id":"W2068812879","doi":"10.3141/1769-04","title":"Guidelines for Probabilistic Pavement Life Cycle Cost Analysis","year":2001,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":89,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Probabilistic logic; Life-cycle cost analysis; Pavement engineering; Probabilistic analysis of algorithms; Probability distribution; Activity-based costing; Variance (accounting); Log-normal distribution; Operations research; Computer science; Engineering; Transport engineering; Econometrics; Reliability engineering; Statistics; Mathematics; Economics","score_opus":0.21304006750310323,"score_gpt":0.42025458501039603,"score_spread":0.2072145175072928,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2068812879","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9638625,0.00018086453,0.012811488,0.020414516,0.00047689065,0.001858354,0.000048201837,0.00005974138,0.00028743807],"genre_scores_gemma":[0.9942832,0.0003328276,0.0020789711,0.0006787812,0.0013754492,0.00026344816,0.00008937934,0.000070505004,0.00082745554],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9920437,0.00030540364,0.0021518653,0.0005534707,0.0039050484,0.0010405547],"domain_scores_gemma":[0.9813722,0.0011247359,0.00093308405,0.00064029207,0.015746221,0.00018350474],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008846994,0.00030194913,0.0007031533,0.0027474242,0.0010021704,0.00049644575,0.0013972801,0.0001547159,0.000602133],"category_scores_gemma":[0.0026326287,0.00022514531,0.0010425908,0.007932382,0.00039319225,0.001188928,0.000015718631,0.0010799888,0.00005073699],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017750992,0.0005899073,0.85013855,0.0006414403,0.0020117082,0.0000806357,0.00046520925,0.08615901,0.00056102034,0.006963065,0.03816829,0.012446064],"study_design_scores_gemma":[0.0022481827,0.00014978378,0.8511439,0.00026475434,0.0014449388,1.8889844e-7,0.0019065386,0.021381471,0.000061765626,0.009358768,0.1116723,0.0003674089],"about_ca_topic_score_codex":0.017627755,"about_ca_topic_score_gemma":0.079093605,"teacher_disagreement_score":0.07350401,"about_ca_system_score_codex":0.00022540487,"about_ca_system_score_gemma":0.0004035806,"threshold_uncertainty_score":0.98891395},"labels":[],"label_agreement":null},{"id":"W2073790377","doi":"10.1061/9780784413067.079","title":"Life-Cycle Management - West Coast Deep Sea Wharf","year":2013,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Wharf; Harbour; Engineering; Civil engineering; Transport engineering; Computer science; Marine engineering","score_opus":0.011322239999079204,"score_gpt":0.20159018678581075,"score_spread":0.19026794678673156,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2073790377","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41635892,0.00007805166,0.0034960744,0.009416799,0.0005460865,0.0006208976,0.0000011953267,0.0009959795,0.568486],"genre_scores_gemma":[0.9800111,0.000013172642,0.00091924035,0.01295606,0.0010717626,0.000075255215,0.000040448846,0.000046276185,0.0048666755],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9984044,0.000009845152,0.00034150484,0.00041207383,0.00037419572,0.00045800017],"domain_scores_gemma":[0.999066,0.0000364889,0.00015906668,0.0004918922,0.00018785741,0.000058683945],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00023164114,0.00023464896,0.0002369373,0.00032104235,0.00024400704,0.0009292143,0.0004409009,0.000056708635,0.010061882],"category_scores_gemma":[0.00016129215,0.00020572248,0.00013286115,0.00074336195,0.000041913278,0.0015998846,0.00048001987,0.00011375987,0.024599856],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020169091,0.0005083413,0.34535134,0.00063918537,0.0007693283,0.000050635572,0.00008157354,0.0025035436,0.00012521882,0.02788976,0.5136717,0.10838917],"study_design_scores_gemma":[0.0022629441,0.000014988236,0.40585408,0.00013985815,0.0008521695,0.0000031443356,0.0037669586,0.33116424,0.000048217982,0.008161335,0.24593826,0.0017938046],"about_ca_topic_score_codex":0.005078405,"about_ca_topic_score_gemma":0.0005359515,"teacher_disagreement_score":0.56365216,"about_ca_system_score_codex":0.000031241423,"about_ca_system_score_gemma":0.0000079243455,"threshold_uncertainty_score":0.99084306},"labels":[],"label_agreement":null},{"id":"W2074313840","doi":"10.3141/2366-02","title":"Toward Sustainable Pavement Management","year":2013,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Greenhouse gas; Environmental impact assessment; Asset management; Environmental economics; Business; Asset (computer security); Transport engineering; Process (computing); Environmental science; Environmental resource management; Engineering; Computer science; Economics","score_opus":0.08005736007619961,"score_gpt":0.3352042570303386,"score_spread":0.255146896954139,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2074313840","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9802074,0.00013923559,0.0011576379,0.012656426,0.00046159702,0.0017067215,0.00000509495,0.000063888394,0.003602001],"genre_scores_gemma":[0.99265444,0.00026712214,0.001060435,0.00037173886,0.00065858813,0.00020598968,0.000018809738,0.00006867713,0.0046942225],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9918035,0.00032494703,0.0014632334,0.00047587045,0.0045936033,0.0013388009],"domain_scores_gemma":[0.99089634,0.00041581658,0.00063273567,0.0006173085,0.0072957594,0.00014201128],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.005371377,0.00029011598,0.0004546137,0.0021507498,0.0009247018,0.0008201887,0.001672169,0.00013413842,0.0016722949],"category_scores_gemma":[0.00021750001,0.0002151287,0.00049578573,0.004221609,0.0004129191,0.0024836434,0.00003668213,0.0015747782,0.00044373362],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007568982,0.001011238,0.67809725,0.0032726985,0.001058759,0.0007916727,0.0019195373,0.003193121,0.001515458,0.1000349,0.18346772,0.024880718],"study_design_scores_gemma":[0.0015485869,0.00010853331,0.8594198,0.00032106426,0.0001613235,2.3231782e-7,0.011530885,0.00045406615,0.00022460801,0.024578035,0.10135446,0.00029838976],"about_ca_topic_score_codex":0.04386303,"about_ca_topic_score_gemma":0.006620409,"teacher_disagreement_score":0.18132254,"about_ca_system_score_codex":0.0003209567,"about_ca_system_score_gemma":0.00018096108,"threshold_uncertainty_score":0.99924034},"labels":[],"label_agreement":null},{"id":"W2080273308","doi":"10.1016/s1499-4046(06)60262-5","title":"Bridging the Life Cycle","year":2005,"lang":"en","type":"article","venue":"Journal of Nutrition Education and Behavior","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bridging (networking); Computer science; Computer security","score_opus":0.01722181859781791,"score_gpt":0.27266742015146106,"score_spread":0.25544560155364315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2080273308","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9775458,0.0006474482,0.00008301541,0.02072887,0.00045155443,0.00007721363,3.5903076e-7,0.000013730415,0.00045198647],"genre_scores_gemma":[0.9888833,0.00005401462,0.00048595286,0.003529463,0.006910022,0.000015102945,0.000003135019,0.000007264314,0.00011173839],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9994123,0.000009710585,0.00027031437,0.00006351624,0.00016560074,0.00007855329],"domain_scores_gemma":[0.9992372,0.00002156733,0.00034244513,0.000076377495,0.00030257305,0.000019878958],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002861976,0.00006031189,0.00009450359,0.00020636305,0.00015915348,0.00023372601,0.00010014209,0.000023752113,0.0001306772],"category_scores_gemma":[0.00013767222,0.00004376882,0.000070206086,0.0002215734,0.000025146206,0.0007802847,0.000018060664,0.00011324522,0.000032623713],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023622835,0.009206921,0.08083086,0.00014320938,0.000054536056,0.0000039836145,0.000272751,0.00009005991,0.0016036084,0.0012176947,0.1204722,0.78608054],"study_design_scores_gemma":[0.0012345352,0.000020532985,0.59597087,0.00023915188,0.0012055249,0.00012991173,0.0037724832,0.002315423,0.00013702268,0.00051100284,0.39420384,0.000259705],"about_ca_topic_score_codex":0.000028456214,"about_ca_topic_score_gemma":0.0000071946934,"teacher_disagreement_score":0.78582084,"about_ca_system_score_codex":0.000022041282,"about_ca_system_score_gemma":0.000037773447,"threshold_uncertainty_score":0.22538252},"labels":[],"label_agreement":null},{"id":"W2082167717","doi":"10.1108/17410390610658513","title":"Supply/demand chain modeling utilizing logistical‐based costing","year":2006,"lang":"en","type":"article","venue":"Journal of Enterprise Information Management","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Activity-based costing; Container (type theory); Supply chain; Factory (object-oriented programming); Computer science; Operations research; Manufacturing engineering; Industrial engineering; Engineering; Business","score_opus":0.015866049903242745,"score_gpt":0.22779805536926026,"score_spread":0.2119320054660175,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2082167717","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10301545,0.00007874933,0.840876,0.0010780687,0.000589875,0.00028959452,0.0000027446604,0.00012080962,0.05394875],"genre_scores_gemma":[0.9913716,0.000010745669,0.005992358,0.0017851326,0.00073229725,0.0000057300904,0.00003665471,0.000015867518,0.0000496202],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974873,0.000018492918,0.0013535698,0.00011813814,0.0007021315,0.00032036143],"domain_scores_gemma":[0.99798834,0.00006123829,0.0012078346,0.00021926196,0.0004975504,0.000025749498],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013794296,0.00020998776,0.00030017554,0.0011728759,0.00020605493,0.0007171344,0.0003747646,0.000052054016,0.00008684779],"category_scores_gemma":[0.0002446348,0.00018959216,0.00022386078,0.0005445476,0.000028833736,0.0032874746,0.0001670157,0.00020379094,0.00013822332],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018518194,0.00024806175,0.020705063,0.0007385067,0.00019090137,0.00007212539,0.00007070404,0.93597364,0.00003851435,0.013104052,0.010826092,0.01784713],"study_design_scores_gemma":[0.001482369,0.000012426847,0.0017921873,0.00037041766,0.0002671994,0.000005171925,0.00059150223,0.9755491,0.000014766792,0.0018090096,0.017876351,0.00022949562],"about_ca_topic_score_codex":0.0001149277,"about_ca_topic_score_gemma":0.0000069303987,"teacher_disagreement_score":0.88835615,"about_ca_system_score_codex":0.00013313649,"about_ca_system_score_gemma":0.0000166029,"threshold_uncertainty_score":0.7731344},"labels":[],"label_agreement":null},{"id":"W2099852503","doi":"10.1049/cp.2009.0584","title":"CIGRE/CIRED/UIE joint working group C4.110, voltage dip immunity of equipment in installations - main contributions and conclusions","year":2009,"lang":"en","type":"article","venue":"IET Conference Publications","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Mandate; Harmonics; Voltage; Joint (building); Power (physics); Work (physics); Electrical engineering; Czech; Power quality; Computer science; Engineering; Telecommunications; Mechanical engineering; Civil engineering; Physics; Political science","score_opus":0.04325108061214818,"score_gpt":0.2610262109354317,"score_spread":0.21777513032328355,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099852503","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82040435,0.00032050148,0.0378523,0.058294088,0.00021195266,0.0012164648,0.00018040587,0.00047466584,0.08104525],"genre_scores_gemma":[0.9978878,0.000046093337,0.00042372002,0.0007716803,0.00011123227,0.00009989812,0.00044273667,0.000012902561,0.00020395199],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99821746,0.000049289098,0.0007115618,0.00036943392,0.00025887717,0.000393369],"domain_scores_gemma":[0.99813694,0.00017655162,0.00045920562,0.00058724725,0.00058538635,0.000054655884],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085053395,0.000212231,0.00037902594,0.00083365006,0.00058894156,0.00045803149,0.00039063112,0.000113768205,0.00034007133],"category_scores_gemma":[0.0012732572,0.00022351216,0.0000995311,0.0016830161,0.00016939807,0.0010115498,0.00033966076,0.00031128057,0.000028687691],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009351241,0.00053976075,0.06417966,0.00003088863,0.000064837775,0.000002219927,0.000327666,0.00012745534,0.008414868,0.91070664,0.0020409855,0.013555668],"study_design_scores_gemma":[0.001264715,0.000027116934,0.8794011,0.000289735,0.00019324225,0.0000033846559,0.0013838417,0.027269913,0.00008406127,0.05521262,0.034306612,0.00056367915],"about_ca_topic_score_codex":0.0013453756,"about_ca_topic_score_gemma":0.0015577612,"teacher_disagreement_score":0.855494,"about_ca_system_score_codex":0.00012698518,"about_ca_system_score_gemma":0.00012899765,"threshold_uncertainty_score":0.91145617},"labels":[],"label_agreement":null},{"id":"W2110703005","doi":"10.5539/emr.v1n2p72","title":"Cost Calculation of Building Structures and Building Works in Polish Conditions","year":2012,"lang":"en","type":"article","venue":"Engineering Management Research","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Process (computing); Investment (military); Cost reduction; Publishing; Cost estimate; Computer science; Operations research; Engineering; Architectural engineering; Economics; Systems engineering; Management","score_opus":0.05292293515835456,"score_gpt":0.34075193164574824,"score_spread":0.2878289964873937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110703005","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9898128,0.0002962818,0.0073767933,0.00017081038,0.00014787001,0.00035568973,9.784088e-7,0.00008359508,0.0017551618],"genre_scores_gemma":[0.99664986,0.000025889385,0.0027327875,0.000027179396,0.00043290187,0.00004118131,0.000014208884,0.000026303518,0.000049664544],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9985084,0.000019853805,0.0002614255,0.00021236605,0.0004503389,0.00054762576],"domain_scores_gemma":[0.9994492,0.0001418729,0.00006520217,0.00021994328,0.00009529523,0.000028502442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014757159,0.00012787554,0.00017253394,0.0016567967,0.000116056544,0.0002157012,0.00019607722,0.00005424211,0.00003899821],"category_scores_gemma":[0.0003182437,0.00013683866,0.000038510763,0.0015450693,0.000046361765,0.0009929779,0.0003809613,0.00027058463,0.000006408381],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025640285,0.00014355159,0.37470466,0.0018241196,0.00024855923,0.000020918154,0.00035596488,0.16371372,0.006141428,0.43164387,0.0018300234,0.019347554],"study_design_scores_gemma":[0.0008477011,0.000005761621,0.79534197,0.0006861105,0.00009526488,0.0000017456213,0.0007327181,0.1917046,0.00055319513,0.0028360258,0.00675189,0.00044302564],"about_ca_topic_score_codex":0.00049931003,"about_ca_topic_score_gemma":0.000011144717,"teacher_disagreement_score":0.42880785,"about_ca_system_score_codex":0.00008920867,"about_ca_system_score_gemma":0.0000034257253,"threshold_uncertainty_score":0.55801183},"labels":[],"label_agreement":null},{"id":"W2118065619","doi":"","title":"GENERIC PROTOCOL FOR LONG LIFE PAVEMENTS COST ANALYSIS","year":2003,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Protocol (science); Life-cycle cost analysis; Computer science; Operations research; Transport engineering; Engineering; Reliability engineering","score_opus":0.06772026965899668,"score_gpt":0.30699616134117613,"score_spread":0.23927589168217944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2118065619","genre_codex":"methods","genre_gemma":"protocol","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"protocol","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03499388,0.000014642011,0.42316306,0.001566099,0.00040019964,0.35627648,0.000008771615,0.0011789092,0.18239796],"genre_scores_gemma":[0.45104817,4.3464604e-7,0.004956688,0.010591896,0.0012617445,0.52450573,0.00010915117,0.00009165248,0.007434545],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984909,0.000015634192,0.00040290327,0.00041233026,0.00029186622,0.00038635003],"domain_scores_gemma":[0.99895847,0.000053862124,0.0002729283,0.00039134052,0.00029240298,0.00003098357],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00056544103,0.00020436812,0.00032336763,0.0005768961,0.00024732132,0.00041546067,0.00023665656,0.00005543133,0.0016284713],"category_scores_gemma":[0.00063247664,0.00017396052,0.0003317631,0.0023903924,0.000022404309,0.00051746506,0.000068434674,0.00005591536,0.00028562924],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003116188,0.00025283886,0.9573222,0.0002458617,0.0016045321,0.0000037823118,0.000008557809,0.0032026188,0.00005568382,0.0056764763,0.028727507,0.0028688023],"study_design_scores_gemma":[0.0044565327,0.000020078081,0.07021882,0.000035345776,0.0043165404,4.422212e-7,0.00022450894,0.12614852,0.0004780533,0.0012343405,0.7916947,0.0011721377],"about_ca_topic_score_codex":0.00024483053,"about_ca_topic_score_gemma":0.00023011396,"teacher_disagreement_score":0.8871034,"about_ca_system_score_codex":0.00003747433,"about_ca_system_score_gemma":0.00002764668,"threshold_uncertainty_score":0.99928415},"labels":[],"label_agreement":null},{"id":"W2122203423","doi":"10.1061/40792(173)196","title":"International Perspective on BMPs/SUDS: UK — Sustainable Stormwater Management in the UK","year":2005,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"American Water (Canada)","funders":"","keywords":"Statutory law; Activity-based costing; Stormwater management; Perspective (graphical); Stormwater; Variety (cybernetics); Environmental planning; Sustainable development; Life cycle costing; Business; Engineering; Political science; Construction engineering; Computer science; Environmental science; Accounting; Surface runoff; Law","score_opus":0.01177755872296957,"score_gpt":0.24867395885043073,"score_spread":0.23689640012746116,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122203423","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12517141,0.00001776307,0.00017759626,0.02320016,0.00011996044,0.00025526225,3.49159e-7,0.00007374557,0.85098374],"genre_scores_gemma":[0.9684229,0.000007635651,0.0002239495,0.009238935,0.0011622789,0.000039944458,0.000011039968,0.000013648584,0.020879693],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987631,0.000013617757,0.00019749854,0.0003004309,0.00041148867,0.0003139008],"domain_scores_gemma":[0.9993974,0.000040873798,0.000082962724,0.0002858579,0.00018647156,0.0000064547676],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0006009056,0.00014699493,0.00011202102,0.0004778894,0.00014128056,0.00046598472,0.0005332846,0.00003096347,0.0019046632],"category_scores_gemma":[0.00008828499,0.0000990241,0.00008184257,0.00049673463,0.000026433234,0.00051482447,0.00022011716,0.00013699655,0.0008761139],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000085021406,0.00034182853,0.036956817,0.000039862338,0.00025908413,0.00013038606,0.0009982624,0.0039335587,0.000007706564,0.8395935,0.11152845,0.0061255223],"study_design_scores_gemma":[0.0016400104,0.00001579156,0.051017325,0.000046323632,0.0001652414,0.0000021633111,0.071794525,0.014830447,0.000030539613,0.010333133,0.8495678,0.00055670534],"about_ca_topic_score_codex":0.0025816027,"about_ca_topic_score_gemma":0.0004911456,"teacher_disagreement_score":0.84325147,"about_ca_system_score_codex":0.00034077687,"about_ca_system_score_gemma":0.0000052272358,"threshold_uncertainty_score":0.99990183},"labels":[],"label_agreement":null},{"id":"W213474606","doi":"","title":"Round Table 5 strategies of replacement of components hydro-Québec's vision and asset management strategy","year":2009,"lang":"en","type":"article","venue":"CIRED 2009 - The 20th International Conference and Exhibition on Electricity Distribution","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Asset management; Business; Asset (computer security); Table (database); Economics; Finance; Actuarial science; Computer science; Computer security","score_opus":0.02444222905990549,"score_gpt":0.26245258976184793,"score_spread":0.23801036070194245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W213474606","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9768344,0.00009333285,0.006677338,0.0021006272,0.00007437865,0.0002571523,0.00007726316,0.00004070398,0.013844799],"genre_scores_gemma":[0.9987132,0.00014823083,0.000010803118,0.00018366,0.00007705038,0.000006538157,0.00074576563,0.000004605286,0.00011014245],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9987678,0.000027229755,0.0003793829,0.0002600065,0.00039837364,0.000167206],"domain_scores_gemma":[0.9990427,0.000038710525,0.00041110886,0.00015658101,0.0003358394,0.000015044466],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003519553,0.00015461007,0.00019975302,0.00016472631,0.00016581378,0.0002342601,0.00016825966,0.00005233334,0.00006530647],"category_scores_gemma":[0.000053557404,0.00012608584,0.000049007762,0.0003276599,0.00007819058,0.000624899,0.00004957232,0.00011889949,0.0000059803665],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009923598,0.0011063927,0.0074750963,0.00022305967,0.00037089828,0.00000825996,0.00006203612,0.001967061,0.025835129,0.9026854,0.009112831,0.050161473],"study_design_scores_gemma":[0.0042914185,0.0009630752,0.55981404,0.0008592297,0.00060836115,0.000018205175,0.0019349576,0.31202346,0.00897232,0.10224875,0.007370907,0.00089529675],"about_ca_topic_score_codex":0.0014955004,"about_ca_topic_score_gemma":0.00008633519,"teacher_disagreement_score":0.8004367,"about_ca_system_score_codex":0.00007661314,"about_ca_system_score_gemma":0.000032027525,"threshold_uncertainty_score":0.51416314},"labels":[],"label_agreement":null},{"id":"W2160043248","doi":"10.1109/revet.2012.6195304","title":"Fully burdened cost of energy in military operations","year":2012,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Defence Research and Development Canada","funders":"","keywords":"Renewable energy; Investment (military); Risk analysis (engineering); Computer science; Cost estimate; Energy (signal processing); Commodity; Environmental economics; Operations research; Systems engineering; Engineering; Business; Economics; Finance","score_opus":0.019499362388793063,"score_gpt":0.2314269738534657,"score_spread":0.21192761146467262,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2160043248","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9522455,0.0003301566,0.0019201054,0.00096028403,0.00017367287,0.00007663309,0.0000011846108,0.000066760076,0.04422575],"genre_scores_gemma":[0.9970148,0.000007965271,0.00045200833,0.0010859051,0.00051660254,0.000012724073,0.00002872513,0.000009640192,0.0008716225],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99934614,0.00000863449,0.00023097006,0.00010234135,0.00012304813,0.00018886806],"domain_scores_gemma":[0.99966913,0.000025881825,0.000025760708,0.00017651856,0.000093191535,0.0000095176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002498303,0.00007581481,0.00013460667,0.0002586546,0.000045594406,0.000021178244,0.0001234283,0.000032167685,0.00048239974],"category_scores_gemma":[0.00016434691,0.000067905705,0.000048817725,0.0005278382,0.000021225062,0.0007823451,0.00008719574,0.000036234236,0.00009190322],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002581026,0.00048567366,0.8846703,0.00010030647,0.00009112046,0.0000033072859,0.00016822321,0.022633325,0.0034193443,0.06760784,0.010041553,0.010753184],"study_design_scores_gemma":[0.0022569154,0.00001482363,0.5224066,0.00014632937,0.00035340534,0.000002321903,0.002436905,0.3382824,0.0026215424,0.0011444963,0.12920465,0.0011296177],"about_ca_topic_score_codex":0.018498072,"about_ca_topic_score_gemma":0.006007841,"teacher_disagreement_score":0.3622637,"about_ca_system_score_codex":0.00001962563,"about_ca_system_score_gemma":0.000008438433,"threshold_uncertainty_score":0.9880378},"labels":[],"label_agreement":null},{"id":"W2167017799","doi":"10.1139/l09-122","title":"Detailed analysis of electricity, water, and gas consumption quantities and costs in Toronto’s public schools","year":2010,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Toronto; University of New Brunswick","funders":"","keywords":"Electricity; Consumption (sociology); Gas consumption; Energy consumption; Sample (material); Agricultural economics; Environmental economics; Environmental science; Economics; Environmental engineering; Engineering; Sociology","score_opus":0.01120276509852024,"score_gpt":0.20305237034387066,"score_spread":0.1918496052453504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167017799","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99819994,0.00075488415,0.00028023514,0.00025718068,0.00013700168,0.00003795599,0.0000017010804,0.000008212489,0.00032286756],"genre_scores_gemma":[0.9996619,0.00007776232,0.00006516471,0.00004067421,0.00013045818,0.0000010274648,0.0000050690037,0.000012310986,0.0000056297945],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99913365,0.0000076265765,0.00036277034,0.00010356296,0.00012832123,0.00026409587],"domain_scores_gemma":[0.9993994,0.000046978555,0.00016052792,0.00009998856,0.00020107142,0.00009201543],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006279921,0.00011189291,0.00033588163,0.0016365774,0.00005174078,0.00025798896,0.0001274184,0.000060388655,0.00015768869],"category_scores_gemma":[0.0005079534,0.00010182172,0.00006955007,0.00047888354,0.000030825347,0.00094078144,0.0000218536,0.00023384616,0.0000010362639],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003748167,0.0000059142712,0.9912204,0.00006812043,0.00029685342,0.000020687521,0.000059367947,0.0010700315,0.0049309144,0.0013545661,0.000049719394,0.0009196436],"study_design_scores_gemma":[0.00085224106,0.000018198054,0.86211544,0.00018457514,0.0011714611,0.000029928733,0.00030225306,0.1330587,0.0003357678,0.0001499901,0.0013891449,0.00039228916],"about_ca_topic_score_codex":0.021189444,"about_ca_topic_score_gemma":0.90962887,"teacher_disagreement_score":0.8884394,"about_ca_system_score_codex":0.00012078986,"about_ca_system_score_gemma":0.00006187207,"threshold_uncertainty_score":0.98532856},"labels":[],"label_agreement":null},{"id":"W2188511964","doi":"10.1139/cjce-2015-0179","title":"Optimizing the selection of sustainability measures to minimize life-cycle cost of existing buildings","year":2015,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Upgrade; Sustainability; Installation; Energy consumption; Environmental economics; Total cost; Life-cycle cost analysis; Renewable energy; Operating cost; Risk analysis (engineering); Engineering; Computer science; Reliability engineering; Business; Economics","score_opus":0.030072691001367682,"score_gpt":0.22916292785520126,"score_spread":0.1990902368538336,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2188511964","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87903917,0.00071553775,0.112813614,0.0022213985,0.000890803,0.00038658327,0.000004124998,0.000047331567,0.0038814417],"genre_scores_gemma":[0.99772984,0.0000010591029,0.0015359974,0.00011337855,0.0005733176,0.0000030449362,5.699102e-7,0.000025757188,0.00001704239],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99864644,0.000017224105,0.00058564806,0.000118032796,0.00031607426,0.00031657697],"domain_scores_gemma":[0.99734604,0.0001219244,0.00047213712,0.0001615944,0.0017198017,0.00017849496],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.0017339442,0.00014032227,0.00034020518,0.0007022778,0.00009059393,0.00011173113,0.0003541394,0.000048828057,0.000025885363],"category_scores_gemma":[0.009432928,0.00012320909,0.00013462814,0.0010395452,0.00003895189,0.00043719704,0.00003880949,0.0002084123,0.0000012629446],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019789788,0.000008765186,0.02305646,0.00015725808,0.00009046102,0.000007804674,0.00056396803,0.97275376,0.00040921083,0.00037052188,0.0011559265,0.0014060424],"study_design_scores_gemma":[0.0040761884,0.00019898132,0.074075505,0.0027089526,0.001787059,0.00012341046,0.018791903,0.7688881,0.0029775933,0.0019588228,0.12243059,0.0019828512],"about_ca_topic_score_codex":0.008957226,"about_ca_topic_score_gemma":0.0195848,"teacher_disagreement_score":0.20386565,"about_ca_system_score_codex":0.000287548,"about_ca_system_score_gemma":0.0005782115,"threshold_uncertainty_score":0.998911},"labels":[],"label_agreement":null},{"id":"W2248359536","doi":"","title":"Applying the Total Resource Cost Test to Conservation and Demand Management Initiatives of Local Electricity Distribution Companies in Ontario: Assessment and Recommendations for Reform","year":2009,"lang":"en","type":"article","venue":"York University Digital Library (York University)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Distribution (mathematics); Business; Test (biology); Electricity; Resource (disambiguation); Demand management; Environmental economics; Natural resource economics; Operations management; Environmental planning; Economics; Public economics; Engineering; Geography; Computer science","score_opus":0.017201763971614093,"score_gpt":0.19637076192196087,"score_spread":0.17916899795034677,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2248359536","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91587037,0.000019004168,0.018892087,0.0053594904,0.000030932297,0.0017508836,0.00026097294,0.00014950932,0.05766673],"genre_scores_gemma":[0.99771845,0.0000083617115,0.00044283867,0.0002941382,0.000018032337,0.0000012585926,0.0005496545,0.000005841386,0.00096141343],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9992888,0.000017906505,0.00014464621,0.00025552142,0.0001126444,0.00018049045],"domain_scores_gemma":[0.99946034,0.00018509389,0.00016090568,0.0001223084,0.000041920433,0.000029413282],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008444248,0.00013430935,0.00018040395,0.00039006645,0.00036909754,0.00023133369,0.00019240331,0.000044468565,0.0000062624717],"category_scores_gemma":[0.000015348161,0.00013902057,0.000048281105,0.0010969666,0.00009790288,0.0024314972,0.0002540996,0.0001181912,0.0000010903758],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008833404,0.0006140351,0.7059293,0.00018198034,0.00024043338,0.000043765434,0.0004744487,0.0013302198,0.000020320367,0.24589409,0.009299809,0.03508829],"study_design_scores_gemma":[0.0015527004,0.00010446557,0.69401747,0.00017999035,0.00018975521,0.0000018826565,0.022358302,0.005134606,0.0000144447,0.00075838045,0.27534166,0.00034636314],"about_ca_topic_score_codex":0.0014715244,"about_ca_topic_score_gemma":0.0013628062,"teacher_disagreement_score":0.26604185,"about_ca_system_score_codex":0.00030019417,"about_ca_system_score_gemma":0.000037936486,"threshold_uncertainty_score":0.56690943},"labels":[],"label_agreement":null},{"id":"W2273870489","doi":"10.14288/1.0108897","title":"Life cycle assessment improvements of Frederic Lasserre building at University of British Columbia","year":2015,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Economic history; History","score_opus":0.012783046905535392,"score_gpt":0.18587945533927885,"score_spread":0.17309640843374346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2273870489","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99424124,0.00009563025,0.0005345188,0.000079343474,0.00020452289,0.0002742093,0.00017512465,0.000104533654,0.0042908755],"genre_scores_gemma":[0.99662566,0.000046919722,0.0011061754,0.00008581092,0.00008698673,2.3063046e-7,0.00006392498,0.000028981267,0.0019552843],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9980081,0.000047025485,0.00031793295,0.00056415785,0.0006814454,0.00038135718],"domain_scores_gemma":[0.99759114,0.000050418843,0.0008826006,0.00042584154,0.00092024234,0.00012973546],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00053874374,0.00008334466,0.00062866096,0.00011398822,0.00035619902,0.00025951114,0.00075663876,0.00015003787,0.00038077016],"category_scores_gemma":[0.00019687421,0.0003616287,0.00028071846,0.0009877796,0.00033317562,0.0011788227,0.0009932258,0.00016117125,0.000021131389],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003304237,0.0007097551,0.809026,0.00073123706,0.0004893593,0.00024644137,0.00011072052,0.00041085464,0.0012282257,0.000003948894,0.08281277,0.10419764],"study_design_scores_gemma":[0.0023917973,0.000047405974,0.98459184,0.00034797293,0.00037469168,0.0000074543045,0.0044636996,0.0052282517,7.9651636e-7,0.00027390863,0.0019304977,0.0003416698],"about_ca_topic_score_codex":0.850398,"about_ca_topic_score_gemma":0.8159043,"teacher_disagreement_score":0.17556585,"about_ca_system_score_codex":0.00024562667,"about_ca_system_score_gemma":0.00020896463,"threshold_uncertainty_score":0.9998836},"labels":[],"label_agreement":null},{"id":"W2277605153","doi":"10.1007/1-4020-2595-5_47","title":"Development and Verification of a Predictive Model and Engineering Software Guide for Durability Evaluation of Polymer-Based Materials in LEO","year":2004,"lang":"en","type":"book-chapter","venue":"Space technology proceedings","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; Integrity Testing Laboratory (Canada)","funders":"","keywords":"Durability; Software; Computer science; Engineering; Systems engineering; Programming language","score_opus":0.024621807731639217,"score_gpt":0.236009603027572,"score_spread":0.2113877952959328,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2277605153","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9959181,0.000297368,0.0012176458,0.00049362314,0.000028864984,0.0009960555,0.00001592501,0.00017140975,0.0008610081],"genre_scores_gemma":[0.9873662,0.000009531405,0.012167883,0.000012679995,0.000030079173,0.0001479304,0.000031392836,0.00003895026,0.00019534776],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9987428,7.3520255e-7,0.0004803196,0.00039504762,0.0002367339,0.0001443644],"domain_scores_gemma":[0.9984726,0.000021020707,0.0006466707,0.00011929051,0.0007337127,0.0000067567844],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00086628966,0.00021861671,0.00043005767,0.0009964138,0.000039785522,0.000023551602,0.00012204199,0.00036745542,0.000004748031],"category_scores_gemma":[0.000828042,0.00023911224,0.00002993838,0.00016025407,0.00012567826,0.00019505322,0.00010231519,0.00010780791,3.748979e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006659761,0.0002650421,0.041112483,0.022490587,0.0008324698,0.0000014051647,0.0011813429,0.0074737067,0.29887605,0.599147,0.0001756534,0.027778247],"study_design_scores_gemma":[0.010462815,0.00021658996,0.017971266,0.010744663,0.0045262575,0.000005635799,0.0014437769,0.31575426,0.41352585,0.22079699,0.0015971902,0.0029547028],"about_ca_topic_score_codex":0.000037339294,"about_ca_topic_score_gemma":0.00001574513,"teacher_disagreement_score":0.37835005,"about_ca_system_score_codex":0.00015976862,"about_ca_system_score_gemma":0.00011721409,"threshold_uncertainty_score":0.97507143},"labels":[],"label_agreement":null},{"id":"W2282600355","doi":"10.14288/1.0108883","title":"Life cycle assessment of the Civil and Mechanical Engineering Building","year":2015,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering; Civil engineering; Architectural engineering; Forensic engineering; Construction engineering","score_opus":0.011379446644793722,"score_gpt":0.18016477005996923,"score_spread":0.1687853234151755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2282600355","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99609125,0.000044303506,0.0019821182,0.0002685654,0.00011373657,0.00008839824,0.0000060959287,0.000050229228,0.0013552817],"genre_scores_gemma":[0.9989829,0.0000062807903,0.0007522905,0.00011546796,0.00008733313,2.1038082e-7,0.000001922794,0.000010850986,0.00004275339],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9992273,0.000012822763,0.000120515455,0.00020790403,0.00028316546,0.0001482776],"domain_scores_gemma":[0.9993344,0.000035998197,0.00017957627,0.00020905427,0.00019731994,0.000043661606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003777187,0.000038168648,0.00021242621,0.00005507625,0.000118690485,0.00012252067,0.00030005095,0.000052250994,0.000023620009],"category_scores_gemma":[0.00036344887,0.00010085117,0.00009044573,0.0004277119,0.000076917386,0.00044405958,0.0004580078,0.000102860875,0.0000023475568],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000248028,0.0005962924,0.71311134,0.0014996723,0.00075428304,0.0001267139,0.00027517733,0.02020848,0.0041233236,0.0011359594,0.018895017,0.23924892],"study_design_scores_gemma":[0.00054739753,0.0000060187895,0.90286946,0.00014429202,0.000118655385,0.000003722764,0.0005124467,0.09485397,6.310209e-7,0.00036704112,0.00045801772,0.00011833657],"about_ca_topic_score_codex":0.05257762,"about_ca_topic_score_gemma":0.029179636,"teacher_disagreement_score":0.23913057,"about_ca_system_score_codex":0.00003624219,"about_ca_system_score_gemma":0.00005507518,"threshold_uncertainty_score":0.9885353},"labels":[],"label_agreement":null},{"id":"W229635195","doi":"","title":"Whole Building Commissioning","year":2000,"lang":"en","type":"article","venue":"Defense Technical Information Center (DTIC)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Project commissioning; Yesterday; Government (linguistics); Navy; Process (computing); Engineering; Publishing; Operations management; Computer science; Political science; Law","score_opus":0.01641134917124969,"score_gpt":0.23652282404232838,"score_spread":0.22011147487107868,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W229635195","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5247823,0.00004255655,0.014048265,0.005845555,0.00042191095,0.00052964385,0.000019157798,0.0026206826,0.4516899],"genre_scores_gemma":[0.99010116,0.0000057833836,0.0018489992,0.0072312597,0.0003350987,0.000015623147,0.00017112482,0.00001847159,0.00027250408],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984938,0.000011470792,0.0006073183,0.00016311556,0.00037276046,0.0003515148],"domain_scores_gemma":[0.9991707,0.0000566914,0.00021319778,0.00037295476,0.00015158356,0.000034874538],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0004288753,0.00018862958,0.00021223573,0.00031648375,0.0003140811,0.00060575956,0.00033967683,0.000107415915,0.0012534603],"category_scores_gemma":[0.00032834194,0.00017269806,0.00014797138,0.0006611576,0.00005248894,0.0031728086,0.00016824092,0.00025518582,0.004315093],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036386406,0.0007537689,0.060826562,0.0007765813,0.00024868033,0.00004195972,0.0004759282,0.008799483,0.002668686,0.052745078,0.40723327,0.46506613],"study_design_scores_gemma":[0.00067240815,0.0000063856846,0.005671535,0.00014622255,0.000059273363,0.000012020152,0.0000667337,0.023153633,0.00005566899,0.0008403814,0.96899456,0.00032115213],"about_ca_topic_score_codex":0.000074178824,"about_ca_topic_score_gemma":0.000005544744,"teacher_disagreement_score":0.5617613,"about_ca_system_score_codex":0.000060529797,"about_ca_system_score_gemma":0.0000097216425,"threshold_uncertainty_score":0.99965954},"labels":[],"label_agreement":null},{"id":"W2307390752","doi":"","title":"Development of Wastewater Collection Network Asset Database, Deterioration Models and Management Framework","year":2010,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; University of Waterloo; Canadian Water Network","keywords":"Wastewater; Asset management; Asset (computer security); Database; Computer science; Business; Environmental science; Environmental engineering; Computer security; Finance","score_opus":0.016601843159761008,"score_gpt":0.20551330058523148,"score_spread":0.18891145742547047,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2307390752","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9976454,0.000038050846,0.00066150574,0.00011875574,0.00038631237,0.00031706633,0.0000067127485,0.000056266745,0.0007699406],"genre_scores_gemma":[0.6415516,0.00036518465,0.23338062,0.000103253835,0.00070939405,0.000008370736,0.0064106737,0.00014716866,0.11732373],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9987145,0.000015594876,0.0002597759,0.00040979398,0.00035945934,0.00024084917],"domain_scores_gemma":[0.9987168,0.000021011134,0.00065719837,0.000328324,0.00025616327,0.000020511516],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032732813,0.00025251004,0.00041349672,0.0005325883,0.0003718837,0.000086465334,0.00027762982,0.0002864653,0.0000914251],"category_scores_gemma":[0.000013725424,0.0002900188,0.00009121483,0.00052473706,0.000046535002,0.0008332554,0.00021468717,0.00024681428,0.000020957856],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.008798388,0.0026963917,0.05314734,0.079749286,0.014402157,0.0004044329,0.41832116,0.022405738,0.12258612,0.03686379,0.078993686,0.16163151],"study_design_scores_gemma":[0.008423211,0.00019629102,0.15005966,0.017442873,0.014789901,0.000007416753,0.55567074,0.17396344,0.009308659,0.023538487,0.038322072,0.008277234],"about_ca_topic_score_codex":0.0059797657,"about_ca_topic_score_gemma":0.050837032,"teacher_disagreement_score":0.3560938,"about_ca_system_score_codex":0.00004326568,"about_ca_system_score_gemma":0.000030757354,"threshold_uncertainty_score":0.9999552},"labels":[],"label_agreement":null},{"id":"W2311786210","doi":"10.14288/1.0167331","title":"Application of life-cycle approaches for the evaluation of high performance buildings","year":2014,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Architectural engineering; Computer science; Environmental science; Engineering","score_opus":0.023115377999045277,"score_gpt":0.18575859485756077,"score_spread":0.1626432168585155,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2311786210","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97981954,0.000047918147,0.018960143,0.00014766718,0.000042200376,0.00034469983,0.000009342734,0.000023713857,0.00060480076],"genre_scores_gemma":[0.99932826,0.000008849932,0.00045992475,0.000032928776,0.000106069456,0.0000035039072,0.000023338322,0.000009310193,0.000027845137],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9991791,0.000017218083,0.0001533272,0.00020139171,0.00034134055,0.00010759936],"domain_scores_gemma":[0.9985462,0.00009672055,0.00046580564,0.0002647421,0.00061758625,0.0000089646155],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011952176,0.00003280133,0.0001997821,0.00006054549,0.00018753954,0.000045116984,0.00033302343,0.000047669124,0.000019581175],"category_scores_gemma":[0.00025944915,0.00008138288,0.00009358634,0.00038816486,0.0001446973,0.00042936965,0.00009575378,0.000042179214,0.000004133441],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011851132,0.00006158511,0.049486313,0.00031352905,0.000059823516,2.5091659e-8,0.00003262844,0.0059640566,0.00009978799,0.000071178954,0.00037099465,0.94352823],"study_design_scores_gemma":[0.00049756764,0.000007022383,0.62466455,0.000034348697,0.00024947117,1.6505908e-7,0.00028154167,0.37344936,0.0000021230176,0.00060298695,0.00015609461,0.000054810218],"about_ca_topic_score_codex":0.07139866,"about_ca_topic_score_gemma":0.015905133,"teacher_disagreement_score":0.9434734,"about_ca_system_score_codex":0.000021847696,"about_ca_system_score_gemma":0.00002411856,"threshold_uncertainty_score":0.93478495},"labels":[],"label_agreement":null},{"id":"W2320176120","doi":"10.1061/9780784413005.013","title":"LCCA and Pavement Design for the New Parallel Runway at Calgary International Airport","year":2013,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hatch (Canada)","funders":"","keywords":"Runway; Transport engineering; International airport; Aviation; Engineering; Zoning; Civil engineering; Aeronautics; Geography","score_opus":0.033190361551605624,"score_gpt":0.22887803950818772,"score_spread":0.1956876779565821,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2320176120","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06546412,0.00041802836,0.81433076,0.07570313,0.0011791539,0.002871783,0.0000016971059,0.00040927128,0.039622054],"genre_scores_gemma":[0.889475,0.000058177113,0.023164542,0.017179156,0.0028807146,0.0003939778,0.00006367828,0.000051133506,0.06673366],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99925464,0.000003979105,0.00018662315,0.000201136,0.00018379654,0.000169796],"domain_scores_gemma":[0.9994373,0.00015307582,0.00010800779,0.00017147361,0.000114490475,0.000015693762],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00027803262,0.00011025417,0.00010045112,0.000071712115,0.00022135445,0.00032810032,0.00022733635,0.000028236833,0.0014962301],"category_scores_gemma":[0.00011079793,0.0000694999,0.000064036205,0.00009137973,0.000025805655,0.00043035042,0.00022548431,0.00003886253,0.00031215113],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032084925,0.000048928236,0.05920243,0.000034454115,0.000349845,0.000001620381,0.00005226036,0.0011257662,0.0003270561,0.011355715,0.8899459,0.037523933],"study_design_scores_gemma":[0.0013140767,0.000012489469,0.0563577,0.000023467017,0.00025576097,0.0000019716922,0.00020953201,0.46418184,0.000107442494,0.009606678,0.4675632,0.00036584632],"about_ca_topic_score_codex":0.0023132325,"about_ca_topic_score_gemma":0.00013153342,"teacher_disagreement_score":0.82401085,"about_ca_system_score_codex":0.000027970538,"about_ca_system_score_gemma":0.000011581195,"threshold_uncertainty_score":0.99941653},"labels":[],"label_agreement":null},{"id":"W2327480451","doi":"10.2316/journal.203.2010.3.203-4478","title":"A STRUCTURED MODEL FOR ASSET MANAGEMENT IN THE WIND INDUSTRY","year":2010,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Wind power; Asset (computer security); Greenhouse gas; Asset management; Investment (military); Business; Environmental economics; Risk analysis (engineering); Computer science; Operations research; Environmental resource management; Engineering; Environmental science; Finance; Economics; Computer security","score_opus":0.014453329614994593,"score_gpt":0.2534037479330227,"score_spread":0.23895041831802813,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2327480451","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97984374,0.00010066998,0.006596507,0.0022716175,0.0034411692,0.000073461466,0.0000073856095,0.000010551391,0.007654911],"genre_scores_gemma":[0.9975154,0.0000045879283,0.00015201856,0.0007396721,0.0012684298,0.0000042713186,0.0000054515044,0.00000863685,0.00030152936],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999101,0.000009064842,0.0003339702,0.000093181,0.0003603527,0.00010246167],"domain_scores_gemma":[0.99926966,0.00004472627,0.0003108688,0.000090348265,0.00027418838,0.000010200279],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000577884,0.00008550861,0.00012812566,0.0003187082,0.000041504696,0.00037054313,0.00041882132,0.00007783284,0.000010033046],"category_scores_gemma":[0.00006732713,0.000057224497,0.00007224634,0.000106652566,0.000019215939,0.00038255713,0.000052652264,0.0002161199,7.705768e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006333,0.0005464039,0.14894795,0.00024184861,0.003162095,0.00048988586,0.0018030695,0.2160877,0.0022825466,0.53495383,0.063577496,0.027273854],"study_design_scores_gemma":[0.0031351713,0.000023268136,0.0340858,0.00023293406,0.00026029014,0.00026140778,0.0030232724,0.74751395,0.000013848416,0.012908443,0.1981309,0.00041069306],"about_ca_topic_score_codex":0.000185141,"about_ca_topic_score_gemma":0.00008961039,"teacher_disagreement_score":0.53142625,"about_ca_system_score_codex":0.000015758324,"about_ca_system_score_gemma":0.000011519305,"threshold_uncertainty_score":0.3573156},"labels":[],"label_agreement":null},{"id":"W2331344816","doi":"10.1061/40794(179)177","title":"A Semantic Knowledge Management Environment for Product Life Cycle Costs","year":2005,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Product lifecycle; Probabilistic logic; Risk analysis (engineering); Decision support system; Operations research; New product development; Business; Artificial intelligence; Engineering","score_opus":0.01620493158409759,"score_gpt":0.22977078504665813,"score_spread":0.21356585346256055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2331344816","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24553353,0.0016842637,0.035868283,0.025150383,0.001002146,0.0044819512,0.000007831039,0.0016969345,0.68457466],"genre_scores_gemma":[0.9792184,0.000028167626,0.0058597303,0.0025343804,0.0027282094,0.00018596218,0.000032881962,0.000052885756,0.009359356],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984312,0.000008101634,0.00035448652,0.0005419989,0.00023537433,0.0004288183],"domain_scores_gemma":[0.9992271,0.000043070402,0.0001474234,0.00048817383,0.000063875996,0.000030345569],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00046520788,0.00023267535,0.00024403633,0.00028701994,0.00022953002,0.00023289997,0.00031814902,0.000034973356,0.00048500067],"category_scores_gemma":[0.0001049593,0.00021122152,0.00016010836,0.00032359886,0.00003548982,0.00056557,0.00029320832,0.00006743241,0.0039922683],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011889457,0.0018878432,0.01691379,0.0015024139,0.0010002991,0.000011011974,0.00013982365,0.006997653,0.00030156228,0.07063774,0.21744287,0.6830461],"study_design_scores_gemma":[0.00116347,0.00000835627,0.0071468526,0.000054984263,0.0004757381,7.068484e-7,0.00023841871,0.07675045,0.00010792978,0.00044582033,0.913092,0.00051523297],"about_ca_topic_score_codex":0.00008388736,"about_ca_topic_score_gemma":0.00009630154,"teacher_disagreement_score":0.7336849,"about_ca_system_score_codex":0.00011710361,"about_ca_system_score_gemma":0.000008473059,"threshold_uncertainty_score":0.99678326},"labels":[],"label_agreement":null},{"id":"W2404158573","doi":"10.1007/s11367-016-1136-3","title":"Comments on the relevance of life cycle costing in sustainability assessment of product systems","year":2016,"lang":"en","type":"article","venue":"The International Journal of Life Cycle Assessment","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Alberta Innovates Bio Solutions","keywords":"Sustainability; Relevance (law); Activity-based costing; Life cycle costing; Product (mathematics); Life-cycle assessment; Product lifecycle; Business; New product development; Engineering; Operations management; Economics; Production (economics); Political science; Accounting; Marketing; Mathematics; Microeconomics","score_opus":0.025894851395048827,"score_gpt":0.314910982447801,"score_spread":0.2890161310527522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2404158573","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9548989,0.00009517866,0.0011958571,0.040463205,0.00084817904,0.0003744677,0.000008637612,0.000013520169,0.0021020486],"genre_scores_gemma":[0.9977842,0.00004436472,0.00015968713,0.0009837563,0.0009408968,0.000019603443,0.0000023087407,0.000022882381,0.000042309377],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9960162,0.00022606672,0.0015703519,0.00024000245,0.0016848445,0.00026254568],"domain_scores_gemma":[0.99275076,0.0017739986,0.002893662,0.00050475943,0.0020424684,0.000034329518],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0050539616,0.00020882917,0.00050629955,0.00035979488,0.000107736385,0.00015669508,0.0014722885,0.000038951108,0.00005818977],"category_scores_gemma":[0.0050954334,0.00010941717,0.00021312245,0.0004195577,0.00015309559,0.00064940145,0.00038462508,0.00032826042,0.00000438551],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036232,0.0012360776,0.8939193,0.00025778238,0.0010373788,0.000021487467,0.00012493462,0.057460498,0.0018542557,0.031343907,0.002702772,0.009679297],"study_design_scores_gemma":[0.0033626661,0.00012838829,0.9254851,0.0019816225,0.00020928086,0.000009049335,0.0031210664,0.054385155,0.0002573604,0.0075828284,0.003105307,0.000372223],"about_ca_topic_score_codex":0.0007730664,"about_ca_topic_score_gemma":0.000041154355,"teacher_disagreement_score":0.042885285,"about_ca_system_score_codex":0.0006234542,"about_ca_system_score_gemma":0.00042906558,"threshold_uncertainty_score":0.61000776},"labels":[],"label_agreement":null},{"id":"W2474859581","doi":"10.1061/9780784479957.055","title":"Risk Assessment for the Region of Peel’s Lake-Based Water Supply System","year":2016,"lang":"en","type":"article","venue":"Pipelines 2016","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Miller Group (Canada)","funders":"","keywords":"Water supply; Mains electricity; Business; Environmental economics; Net present value; Service (business); Capital cost; Electricity; Risk management; Risk analysis (engineering); Water resource management; Operations management; Environmental science; Finance; Production (economics); Environmental engineering; Engineering; Marketing; Economics","score_opus":0.019731501780874707,"score_gpt":0.24043702571917888,"score_spread":0.22070552393830417,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2474859581","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24164793,0.00039842053,0.6841437,0.05900459,0.0032441365,0.0024326488,0.00017906274,0.00087888073,0.0080706],"genre_scores_gemma":[0.9953587,0.000015325946,0.0004658776,0.00034550438,0.0019234858,0.0000867254,0.000025500663,0.000034472614,0.0017444076],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.998776,0.00002593921,0.00040132966,0.00026062375,0.0002546372,0.00028144883],"domain_scores_gemma":[0.9981271,0.00044583186,0.00035535978,0.00049496,0.00056553876,0.000011178639],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007446276,0.00016621989,0.00024542888,0.00014919383,0.00019754212,0.00009444514,0.00034097154,0.0000542121,0.00008150567],"category_scores_gemma":[0.00032661945,0.00006718975,0.00021547874,0.00014331985,0.00006150864,0.0003161501,0.00009098748,0.00004804058,0.00020194954],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046946568,0.00029682578,0.5981919,0.0019264632,0.00057821313,0.000014000434,0.000056893143,0.0006104601,0.007991813,0.007818995,0.26502597,0.11701895],"study_design_scores_gemma":[0.005888988,0.000047590227,0.027748557,0.0015190053,0.0022378631,0.000003900655,0.000603483,0.16107677,0.0049909432,0.0017482023,0.79320246,0.00093226606],"about_ca_topic_score_codex":0.00043228274,"about_ca_topic_score_gemma":0.00020045546,"teacher_disagreement_score":0.75371075,"about_ca_system_score_codex":0.000047964208,"about_ca_system_score_gemma":0.000025782605,"threshold_uncertainty_score":0.27399185},"labels":[],"label_agreement":null},{"id":"W2478608122","doi":"","title":"Life Cycle Assessment and Life Cycle Cost of Heat Exchangers - A Case for Inter Terminals Sweden AB Located in Port of Gothenburg","year":2016,"lang":"en","type":"dissertation","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Heat exchanger; Life-cycle assessment; Engineering; Port (circuit theory); Waste management; Environmental science; Environmental engineering; Process engineering; Mechanical engineering; Production (economics)","score_opus":0.02887194370392072,"score_gpt":0.3161350904962705,"score_spread":0.28726314679234977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2478608122","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98968184,0.0001529331,0.0006513321,0.0004442867,0.00026304057,0.0011894804,0.00005439066,0.000059451882,0.0075032352],"genre_scores_gemma":[0.99682844,0.000049794136,0.00014771709,0.0004658354,0.00032088437,0.00021354407,0.00048616048,0.00007577516,0.0014118735],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99778533,0.000023090011,0.0010341179,0.00051715295,0.00030323706,0.0003371004],"domain_scores_gemma":[0.99804264,0.00020818204,0.00080889795,0.0003819394,0.0004988493,0.0000594826],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00071632117,0.0003738629,0.000916774,0.00094932766,0.000077138975,0.00011008468,0.00024446013,0.00023526957,0.00044138046],"category_scores_gemma":[0.00062889594,0.00030733625,0.0002106111,0.00043513166,0.000052173174,0.0004954719,0.0001043488,0.00013624951,0.0000074579402],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.004611623,0.0041919947,0.6404623,0.055861894,0.0065481933,0.0012534966,0.004250979,0.0019847723,0.009282654,0.0018777967,0.050520264,0.21915406],"study_design_scores_gemma":[0.035556845,0.0007114785,0.40786016,0.030766485,0.013296465,0.00012518845,0.098974936,0.3799565,0.006193628,0.003777874,0.0120876,0.010692797],"about_ca_topic_score_codex":0.008464787,"about_ca_topic_score_gemma":0.0032759758,"teacher_disagreement_score":0.37797174,"about_ca_system_score_codex":0.00007225268,"about_ca_system_score_gemma":0.00015301666,"threshold_uncertainty_score":0.9999379},"labels":[],"label_agreement":null},{"id":"W2547974775","doi":"10.1504/ijsa.2016.10001108","title":"Feasibility of green composite aircraft wing projects for unmanned aircraft vehicles","year":2016,"lang":"en","type":"article","venue":"International Journal of Sustainable Aviation","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Activity-based costing; Aeronautics; Durability; Fuel efficiency; Engineering; Life cycle costing; Environmental science; Automotive engineering; Transport engineering; Computer science; Business","score_opus":0.025127805244976185,"score_gpt":0.2744238027676145,"score_spread":0.24929599752263834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2547974775","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97252685,0.00004472011,0.019526254,0.006976361,0.00032600615,0.00028044335,0.0000059589147,0.000029058949,0.0002843554],"genre_scores_gemma":[0.99687725,0.0000057825887,0.00085068884,0.0002754541,0.0012502323,0.000010506385,0.000010865842,0.00001890276,0.0007003235],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9982896,0.000024100038,0.00069068995,0.00017087135,0.0006048921,0.00021986688],"domain_scores_gemma":[0.99376136,0.00022364559,0.0012375815,0.00013173852,0.0046282685,0.000017430644],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00114141,0.00012829002,0.00025117633,0.000676496,0.000094076946,0.00013173201,0.00044666172,0.000057027664,0.00002776459],"category_scores_gemma":[0.0013290495,0.00009734401,0.0002220569,0.00030157383,0.00004667623,0.0022454706,0.00012103219,0.00007467733,0.0000070622414],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012360805,0.0004184203,0.93673635,0.00046363662,0.0006235131,0.00007076285,0.00034089666,0.0009315043,0.022398647,0.017056752,0.0024591917,0.017264245],"study_design_scores_gemma":[0.01448027,0.00029761653,0.7928473,0.0016108142,0.0010203391,0.000051654188,0.0064660516,0.011710955,0.013258427,0.13776849,0.019463792,0.0010243389],"about_ca_topic_score_codex":0.0005234436,"about_ca_topic_score_gemma":0.000022331558,"teacher_disagreement_score":0.1438891,"about_ca_system_score_codex":0.00034006007,"about_ca_system_score_gemma":0.000099046454,"threshold_uncertainty_score":0.39695737},"labels":[],"label_agreement":null},{"id":"W2562862718","doi":"","title":"LibGuides: Canada NACO Funnel Project: Joining NACO","year":2015,"lang":"en","type":"libguides","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Funnel; Computer science; Engineering","score_opus":0.046190223692472956,"score_gpt":0.24802023738832243,"score_spread":0.20183001369584946,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2562862718","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018648459,0.001749406,0.00007892736,0.00555711,0.0063894293,0.0007495731,0.00009742647,0.001267759,0.9822455],"genre_scores_gemma":[0.027906071,0.00022878162,0.0027232252,0.12486351,0.06818832,0.00030864595,0.00631549,0.0012440565,0.7682219],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9947263,0.000036152305,0.0012151111,0.0011854408,0.0017484253,0.0010885486],"domain_scores_gemma":[0.99606943,0.00020323039,0.0011525376,0.0011078123,0.0014016152,0.00006539263],"candidate_categories":["metaepi_narrow","scholarly_communication","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0011550062,0.0009518065,0.0012508073,0.0010981758,0.00040984637,0.0012546539,0.0014150613,0.00048076425,0.0009884934],"category_scores_gemma":[0.0020969727,0.0008523429,0.00032792328,0.0018575906,0.0000740093,0.0011198265,0.0010083491,0.0008516007,0.0006137216],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010093968,0.00002612035,0.0015363041,0.00058430457,0.00028850487,0.000098460245,0.000024886926,0.000081783364,0.000003105824,0.00037343596,0.9948192,0.0021537582],"study_design_scores_gemma":[0.00039211198,0.0000063151283,0.00007799663,0.00045958557,0.0006022428,0.000005242245,0.0010767156,0.0036609217,0.0000045196184,0.00033979598,0.99224246,0.0011320879],"about_ca_topic_score_codex":0.9518704,"about_ca_topic_score_gemma":0.8352505,"teacher_disagreement_score":0.21402362,"about_ca_system_score_codex":0.00062343956,"about_ca_system_score_gemma":0.0029786464,"threshold_uncertainty_score":0.9999247},"labels":[],"label_agreement":null},{"id":"W2578264583","doi":"10.1016/j.enbuild.2017.01.031","title":"Economic evaluation of building energy retrofits: A fuzzy based approach","year":2017,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":102,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"FortisBC","keywords":"Retrofitting; Fuzzy logic; Life-cycle cost analysis; Fuzzy set; Asset (computer security); Engineering; Efficient energy use; Computer science; Operations research; Risk analysis (engineering); Reliability engineering; Business; Artificial intelligence","score_opus":0.027563614398876148,"score_gpt":0.2520339927301782,"score_spread":0.22447037833130204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2578264583","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91587824,0.00034697197,0.010656121,0.0006895656,0.00029278075,0.00006107851,0.00000217385,0.00008908204,0.07198396],"genre_scores_gemma":[0.9972546,0.000012262592,0.0011939129,0.00050381134,0.00084720546,0.000019297318,0.000019482724,0.00002436955,0.0001250462],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99882996,0.000021543236,0.0002823347,0.00038773855,0.00026035347,0.00021805025],"domain_scores_gemma":[0.99863803,0.000041483563,0.0006175051,0.00047969815,0.0002049965,0.00001828195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011180593,0.00017474205,0.00027845858,0.00029169294,0.00048495515,0.00042093985,0.00037856333,0.00009423181,0.000047039885],"category_scores_gemma":[0.0003483457,0.00016985257,0.00010342235,0.00010945636,0.00010837319,0.0009654522,0.00020176053,0.000054127308,0.0000020033885],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011431628,0.00015357892,0.067533344,0.00025145445,0.0003297224,0.0000034086647,0.000043155935,0.026030954,0.006215391,0.76532686,0.0060009933,0.12799682],"study_design_scores_gemma":[0.0018046245,0.000014786979,0.006417385,0.0001439281,0.0006879435,0.000002155845,0.00007916075,0.9152357,0.004411227,0.029428596,0.041219417,0.0005550816],"about_ca_topic_score_codex":0.004456687,"about_ca_topic_score_gemma":0.00012506693,"teacher_disagreement_score":0.88920474,"about_ca_system_score_codex":0.000053659685,"about_ca_system_score_gemma":0.000037482536,"threshold_uncertainty_score":0.6926387},"labels":[],"label_agreement":null},{"id":"W2581950990","doi":"","title":"Advantages of variable speed drive in pump applications","year":2015,"lang":"en","type":"other","venue":"Tampere University Institutional Repository (Tampere University)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Variable (mathematics); Automotive engineering; Control theory (sociology); Engineering; Control engineering; Computer science; Mathematics; Control (management); Artificial intelligence","score_opus":0.009571564975401141,"score_gpt":0.1833466609698102,"score_spread":0.17377509599440905,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2581950990","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0045218333,0.0001122311,0.0008368121,0.00006517389,0.00034332936,0.00050337036,0.00017666217,0.0003384351,0.99310213],"genre_scores_gemma":[0.062190197,0.00012875836,0.0011724761,0.00012202693,0.0012473478,7.707227e-7,0.0009261665,0.00017816285,0.9340341],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99803066,0.000057849797,0.00028886352,0.0007136994,0.0005528254,0.00035608042],"domain_scores_gemma":[0.99807686,0.00006466383,0.000635631,0.000590135,0.0005587713,0.00007393444],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018027946,0.00041868386,0.00061808556,0.0028015878,0.0003907973,0.000055930555,0.0009803164,0.00044639027,0.00059272046],"category_scores_gemma":[0.00008778028,0.0005290927,0.00020544924,0.002431789,0.000550306,0.00086358364,0.00053841126,0.00041103474,0.00022849475],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006573497,0.001990911,0.07587151,0.0022597967,0.0018462803,0.0035268592,0.0002881799,0.011248434,0.0024324916,0.58427763,0.31502014,0.0005803848],"study_design_scores_gemma":[0.0011133024,0.00000965465,0.00043788564,0.00037389598,0.0004404794,0.000011624716,0.0015395288,0.000317888,0.000015821464,0.0001025099,0.99510264,0.0005347635],"about_ca_topic_score_codex":0.008008632,"about_ca_topic_score_gemma":0.00088867196,"teacher_disagreement_score":0.6800825,"about_ca_system_score_codex":0.00080777006,"about_ca_system_score_gemma":0.0007123816,"threshold_uncertainty_score":0.99971604},"labels":[],"label_agreement":null},{"id":"W25968196","doi":"10.1364/ao.54.001331","title":"Tillgänglighet – Att anpassa befintligabyggnader och närmiljön till dagens kravför att öka kvarboende","year":2012,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates - Technology Futures","keywords":"Medicine","score_opus":0.0310331561058497,"score_gpt":0.23487853187553112,"score_spread":0.20384537576968143,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W25968196","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38011712,0.00047282464,0.0011411431,0.005173531,0.0017020929,0.00039051328,0.000010271131,0.0012521275,0.6097404],"genre_scores_gemma":[0.9693346,0.000016258457,0.00072563,0.0075677237,0.0050269263,0.000028975526,0.00009105731,0.000118287,0.017090516],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.996681,0.00003532823,0.00063557643,0.0006521146,0.00073143136,0.0012645636],"domain_scores_gemma":[0.99813473,0.00013438676,0.00036132275,0.00093664665,0.00032601538,0.00010690548],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0008955862,0.0005189606,0.0005463477,0.0005515319,0.00040413055,0.00047795885,0.00063929794,0.00021173779,0.0037884365],"category_scores_gemma":[0.00043848707,0.00045594017,0.00033276068,0.0012275717,0.00010693808,0.002014506,0.0005593381,0.00033361008,0.007974141],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043682932,0.0006252054,0.5930869,0.00029027482,0.00061763753,0.000044675242,0.00024645947,0.00016349638,0.0020713534,0.02912046,0.3608958,0.012794008],"study_design_scores_gemma":[0.0009751716,0.000013525421,0.1121096,0.00007877941,0.00075812545,0.000013103851,0.00046143826,0.00498806,0.0007920338,0.00078661926,0.87762177,0.0014017432],"about_ca_topic_score_codex":0.00085200235,"about_ca_topic_score_gemma":0.0001917729,"teacher_disagreement_score":0.5926499,"about_ca_system_score_codex":0.000096797245,"about_ca_system_score_gemma":0.000027396594,"threshold_uncertainty_score":0.99978924},"labels":[],"label_agreement":null},{"id":"W2605641189","doi":"10.1504/ijpd.2016.10004480","title":"Life-cycle costing of an aircraft wing project with innovative materials using an eco-demonstrator","year":2016,"lang":"en","type":"article","venue":"International Journal of Product Development","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Activity-based costing; Life cycle costing; Cost driver; Engineering; Process (computing); Systems engineering; Manufacturing engineering; Aeronautics; Transport engineering; Computer science; Business","score_opus":0.03873166319522733,"score_gpt":0.2848560346973472,"score_spread":0.24612437150211988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2605641189","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9958341,0.000014821327,0.0024966965,0.0007506094,0.0005752737,0.0001418379,0.000004321498,0.000027978496,0.00015434735],"genre_scores_gemma":[0.97051054,0.0000018445791,0.027252479,0.00026670776,0.0019046507,0.0000033466804,0.000009846241,0.000030658815,0.000019920977],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99766093,0.000041679006,0.0009901169,0.00027794347,0.0008151584,0.00021415511],"domain_scores_gemma":[0.9949678,0.00004628672,0.0016478698,0.00016032063,0.0031432088,0.00003451949],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014888757,0.0001965433,0.00033307046,0.00077263213,0.00009989772,0.00022551238,0.00054325105,0.00003334696,0.000078172205],"category_scores_gemma":[0.0013275,0.00013017682,0.000037972848,0.0005197911,0.00006961341,0.002678,0.00013032708,0.00009586964,0.000007055743],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010171065,0.0009708557,0.17569233,0.00018148345,0.0020705552,0.0002147806,0.0013748592,0.0013647911,0.70282227,0.0004859889,0.00034986134,0.1134551],"study_design_scores_gemma":[0.007920324,0.00035069734,0.26263997,0.006388024,0.0005354316,0.0005816926,0.0037482537,0.002206327,0.70222175,0.0012309236,0.009933757,0.0022428494],"about_ca_topic_score_codex":0.00011488193,"about_ca_topic_score_gemma":0.000021716605,"teacher_disagreement_score":0.111212246,"about_ca_system_score_codex":0.00018129122,"about_ca_system_score_gemma":0.0007645939,"threshold_uncertainty_score":0.53084564},"labels":[],"label_agreement":null},{"id":"W2748344119","doi":"","title":"Decision-making for UBC High Performance Buildings: Multi-criteria Analysis for Integrated Life Cycle Models","year":2010,"lang":"en","type":"article","venue":"IIASA PURE (International Institute of Applied Systems Analysis)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Decision support system; Sustainability; ASHRAE 90.1; Benchmark (surveying); Decision analysis; Computer science; Management science; Life-cycle assessment; Building information modeling; Process management; Systems engineering; Engineering; Data mining; Operations management","score_opus":0.0234007494667518,"score_gpt":0.27350588796209424,"score_spread":0.25010513849534244,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2748344119","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5120871,0.000025109917,0.4842855,0.00011322989,0.0016191571,0.0006068104,0.00015398665,0.000121609795,0.0009874597],"genre_scores_gemma":[0.96261483,0.000007441798,0.033913482,0.00026396953,0.0015786523,0.00040729973,0.0010179129,0.000058200978,0.00013822998],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99610794,0.000009230889,0.0015822884,0.0009809559,0.0008413162,0.0004782955],"domain_scores_gemma":[0.99540293,0.00030334888,0.0015321688,0.0007671247,0.0019306559,0.000063743515],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0014886787,0.00049274776,0.0013534215,0.003215681,0.00040694608,0.00079784135,0.0012873211,0.0002664775,0.00010887],"category_scores_gemma":[0.0007593595,0.0004543735,0.0010976568,0.0036645003,0.0001223006,0.0016240687,0.00023015682,0.00026685908,0.000020629559],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003471773,0.00020780976,0.005266585,0.0002177184,0.012160017,0.0000016709062,0.00007303709,0.91995335,0.0017083236,0.056911316,0.0006016366,0.0025513484],"study_design_scores_gemma":[0.0011438321,0.000007722473,0.0020604113,0.000102566875,0.007389935,6.3449835e-7,0.00020822775,0.9771539,0.000050003942,0.0014068028,0.009990947,0.00048500186],"about_ca_topic_score_codex":0.0015931393,"about_ca_topic_score_gemma":0.002060788,"teacher_disagreement_score":0.4505277,"about_ca_system_score_codex":0.000120207544,"about_ca_system_score_gemma":0.000085695196,"threshold_uncertainty_score":0.9997908},"labels":[],"label_agreement":null},{"id":"W2757637095","doi":"10.6000/1929-6002.2017.06.02.1","title":"Additional External Costs Analysis and Environmental CBA","year":2017,"lang":"en","type":"article","venue":"Journal of Technology Innovations in Renewable Energy","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Environmental science; Risk analysis (engineering); Business","score_opus":0.00925638919237745,"score_gpt":0.2239019931414467,"score_spread":0.21464560394906926,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2757637095","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97756964,0.0003483477,0.00933155,0.00500118,0.000332717,0.00005094228,0.00016045682,0.00006527494,0.0071398667],"genre_scores_gemma":[0.99561167,0.00003270784,0.003076154,0.00034354103,0.00036729465,0.000009948984,0.00010859535,0.0000111666195,0.00043895334],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.998857,0.00000642556,0.0005414502,0.00017533317,0.00024239575,0.00017738657],"domain_scores_gemma":[0.9981216,0.000057699042,0.0012510909,0.00036414008,0.00019551162,0.000009934155],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0003090887,0.00012442062,0.0003033078,0.0038131222,0.00035514403,0.00026925365,0.0005302187,0.00014317693,0.0015245454],"category_scores_gemma":[0.0009333259,0.00012050286,0.00009053275,0.0015184068,0.00022418782,0.0011612773,0.00026804922,0.00021141072,0.0000049690625],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042572934,0.0003928985,0.872271,0.000011979642,0.0009995472,0.00019105076,0.0000057282623,0.008470762,0.005360303,0.024530526,0.044700682,0.043022927],"study_design_scores_gemma":[0.0028903957,0.00008444229,0.5195196,0.00043580806,0.0014512556,0.00021524413,0.00081566337,0.037500534,0.003226015,0.0715485,0.36133626,0.00097624713],"about_ca_topic_score_codex":0.0009775672,"about_ca_topic_score_gemma":0.0010263525,"teacher_disagreement_score":0.35275137,"about_ca_system_score_codex":0.00010763874,"about_ca_system_score_gemma":0.000027918186,"threshold_uncertainty_score":0.9993882},"labels":[],"label_agreement":null},{"id":"W2784198299","doi":"","title":"Deliverable No. 7.6: Socio-Economic impacts of an EAFM","year":2017,"lang":"en","type":"report","venue":"VBN Forskningsportal (Aalborg Universitet)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute on Governance","funders":"","keywords":"Deliverable; Economics; Management","score_opus":0.020939929460474446,"score_gpt":0.24827209313879228,"score_spread":0.22733216367831782,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2784198299","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.58979106,0.00022505422,0.000011468222,0.0000719318,0.0016639312,0.00032142067,0.00011717504,0.00027380497,0.40752414],"genre_scores_gemma":[0.9388239,0.00039900266,0.00029192076,0.00020409348,0.0054809153,0.0000044800304,0.0024453185,0.00026003542,0.052090343],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.996361,0.000017386123,0.0008548269,0.0010209791,0.0009515509,0.0007942269],"domain_scores_gemma":[0.9929469,0.000062498875,0.0037784914,0.0015015459,0.0016013137,0.00010922677],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0010864687,0.00075362565,0.001356217,0.0012983041,0.00074594293,0.00047295302,0.0016131437,0.0006486212,0.0016964129],"category_scores_gemma":[0.00059786637,0.0008323202,0.0007846562,0.00030906472,0.00028335568,0.0034591414,0.00066079805,0.0006091244,0.0014997898],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004430903,0.0005469122,0.40139425,0.00364611,0.0036729176,0.001517168,0.00043559054,0.0010081225,0.0004327449,0.0016438203,0.5766342,0.008625048],"study_design_scores_gemma":[0.0015755676,0.000089111876,0.01927258,0.0010068413,0.0028447884,0.000025184247,0.0010731958,0.003142116,0.00008253895,0.0003582391,0.9685478,0.0019819853],"about_ca_topic_score_codex":0.0629736,"about_ca_topic_score_gemma":0.001446258,"teacher_disagreement_score":0.39191362,"about_ca_system_score_codex":0.0007513147,"about_ca_system_score_gemma":0.0013213216,"threshold_uncertainty_score":0.9994128},"labels":[],"label_agreement":null},{"id":"W2799681608","doi":"10.1080/10773525.2018.1468130","title":"Exposure assessment of non-electric ice resurfacer operators in indoor ice rinks: a pilot study","year":2017,"lang":"en","type":"article","venue":"International Journal of Occupational and Environmental Health","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Ryerson University","keywords":"Environmental science; Ice cream; Food science; Chemistry","score_opus":0.03786151818497504,"score_gpt":0.34579614986951696,"score_spread":0.30793463168454194,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2799681608","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9980432,0.000081753315,0.00012676364,0.00091017643,0.00029624614,0.00015528474,0.00001391451,0.000003125712,0.00036956932],"genre_scores_gemma":[0.9985778,0.00008271843,0.00034722863,0.0004940819,0.0004334655,0.0000045694746,0.000017025759,0.000011056156,0.000032084],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9981415,0.000033869845,0.00070706155,0.00017771126,0.0007942237,0.00014559604],"domain_scores_gemma":[0.9984096,0.000059203343,0.0012540502,0.00014642694,0.00009840398,0.000032312255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009795291,0.00013076083,0.00027315872,0.00039994586,0.00019210856,0.00016308053,0.00044687866,0.00002342994,0.000078270976],"category_scores_gemma":[0.0000872402,0.00011570224,0.00005326766,0.00007918356,0.000050120012,0.00095441163,0.0001996792,0.00021371811,0.000006663911],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002882465,0.0010160335,0.9928743,0.00001982867,0.00010796938,0.00002088978,0.00008616427,0.0005517479,0.00045311239,0.00007851614,0.0001152009,0.0043879943],"study_design_scores_gemma":[0.0018161156,0.0003389251,0.993212,0.00007489187,0.000024560917,0.000008946458,0.00037979003,0.0037757084,0.000014343477,0.00006460625,0.00019458734,0.00009555673],"about_ca_topic_score_codex":0.0017000076,"about_ca_topic_score_gemma":0.00023465125,"teacher_disagreement_score":0.0042924373,"about_ca_system_score_codex":0.00023285749,"about_ca_system_score_gemma":0.000097410666,"threshold_uncertainty_score":0.47182006},"labels":[],"label_agreement":null},{"id":"W2903557676","doi":"10.5539/ass.v14n12p18","title":"Developing Environmentally Friendly Products from Rice Stumps for Community Economy","year":2018,"lang":"en","type":"article","venue":"Asian Social Science","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Office of the Higher Education Commission; Thailand Institute of Scientific and Technological Research","keywords":"Environmentally friendly; Business; Cosmetic industry; European union; Environmental impact assessment; Environmental science; Pulp and paper industry; Engineering; Cosmetics; Chemistry","score_opus":0.034340593578733786,"score_gpt":0.2642885153574889,"score_spread":0.2299479217787551,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2903557676","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67922884,0.000009041657,0.0047245664,0.0060765203,0.0004600269,0.00036519108,0.000007990082,0.00014686417,0.30898094],"genre_scores_gemma":[0.99201113,2.9495652e-7,0.0034776127,0.0019060684,0.0024756487,0.000019064002,0.000018116167,0.000013091115,0.00007895962],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9988432,0.000019475097,0.00019138271,0.0003462162,0.00022776694,0.0003719652],"domain_scores_gemma":[0.99929035,0.00005103908,0.00020996573,0.00025377073,0.00017853657,0.000016311862],"candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.0010570914,0.00012354164,0.00014873063,0.00011660898,0.0028088922,0.00048678648,0.0008273894,0.000037043454,0.0000401307],"category_scores_gemma":[0.00046099603,0.0001280922,0.000045659435,0.0008349881,0.0007738343,0.0014938642,0.00042431016,0.00011672086,0.00025781273],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000126558,0.00074137206,0.09023349,0.0003773454,0.00031941725,0.0000070026344,0.01666581,0.0000025508152,0.041516844,0.2266218,0.02911271,0.5942751],"study_design_scores_gemma":[0.00084159535,0.000038702005,0.6649448,0.000050028233,0.00016918108,5.164841e-7,0.013569911,0.00048498024,0.004330936,0.051257525,0.26332384,0.000987964],"about_ca_topic_score_codex":0.0012724242,"about_ca_topic_score_gemma":0.00015827462,"teacher_disagreement_score":0.5932871,"about_ca_system_score_codex":0.0001876018,"about_ca_system_score_gemma":0.00009301595,"threshold_uncertainty_score":0.9984893},"labels":[],"label_agreement":null},{"id":"W2938071321","doi":"10.5539/ijef.v11n5p59","title":"Measuring the Cost of Noise Pollution and Its Impact in Reducing Corporate Profits, Income Tax Collections, the Treasury, the National Economy and the Welfare of Society","year":2019,"lang":"en","type":"article","venue":"International Journal of Economics and Finance","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Treasury; Noise pollution; Pollution; Revenue; Business; Welfare; Tax revenue; Natural resource economics; Economics; Public economics; Finance; Noise reduction; Market economy; Political science; Computer science","score_opus":0.0244889565053871,"score_gpt":0.22727390185760693,"score_spread":0.20278494535221983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938071321","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9872804,0.0005755614,0.000009100277,0.011290207,0.00013298614,0.00016471984,0.000015215683,8.6350747e-7,0.0005309187],"genre_scores_gemma":[0.99849206,0.0010018251,0.000015712963,0.00022296856,0.00019685343,0.0000048632146,0.000001152734,0.0000050827834,0.00005946112],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99933153,0.000024053035,0.0004005131,0.00008864155,0.00008834558,0.000066902634],"domain_scores_gemma":[0.99819314,0.00016560922,0.0011982371,0.000061964645,0.00037671474,0.000004333407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00153092,0.00007561548,0.00016747127,0.000098413875,0.00016664629,0.00016782692,0.00022938452,0.00002384773,0.0000050729927],"category_scores_gemma":[0.00015251816,0.00003844207,0.000089617824,0.00014271506,0.00012095824,0.00042111985,0.00009454118,0.00013521007,4.239034e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012781322,0.00014666186,0.44199285,0.00014579292,0.001655478,0.0000017389424,0.001731099,0.31565642,0.00030228848,0.22343446,0.0013418259,0.012313247],"study_design_scores_gemma":[0.0027236138,0.000021328999,0.5254464,0.00021200874,0.00008599566,0.00005754647,0.00081722223,0.4547144,0.00009078958,0.011783496,0.0039079865,0.00013921286],"about_ca_topic_score_codex":0.0003844729,"about_ca_topic_score_gemma":0.00008364547,"teacher_disagreement_score":0.21165097,"about_ca_system_score_codex":0.00006832908,"about_ca_system_score_gemma":0.00005900042,"threshold_uncertainty_score":0.16183588},"labels":[],"label_agreement":null},{"id":"W2969932592","doi":"10.1680/jinam.18.00036","title":"Value-based optimisation for cross-asset maintenance in a Canadian municipality","year":2019,"lang":"en","type":"article","venue":"Infrastructure Asset Management","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Asset (computer security); Value (mathematics); Investment (military); Present value; Value engineering; Disconnection; Return on investment; Operations research; Investment value; Computer science; Business; Environmental economics; Finance; Economics; Operations management; Microeconomics; Production (economics); Engineering","score_opus":0.009394812492116605,"score_gpt":0.25488764256985075,"score_spread":0.24549283007773415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2969932592","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9433094,0.000020660756,0.0023614378,0.0020918283,0.0009250693,0.0019793494,0.00005631552,0.00018005916,0.049075853],"genre_scores_gemma":[0.9892881,0.0000018457316,0.0043091904,0.004950342,0.00026618582,0.0001332155,0.00040105186,0.000047972906,0.00060208666],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.997662,0.00002464474,0.00050144934,0.00061989715,0.00036657008,0.00082544156],"domain_scores_gemma":[0.9986174,0.000072965435,0.000297661,0.00076622446,0.00019342572,0.000052298015],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010288162,0.00031425257,0.00034492224,0.00085917563,0.00017015047,0.00057496835,0.0006366433,0.00013165844,0.0003441661],"category_scores_gemma":[0.00018383449,0.00031406528,0.00016062324,0.0009272586,0.000045008896,0.00068846304,0.00016489202,0.00019955833,0.00018555927],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007847343,0.000039487568,0.7008823,0.0006586146,0.00011720801,0.000021829837,0.000035665173,0.2456061,0.000027545375,0.03616218,0.012577122,0.0037934883],"study_design_scores_gemma":[0.0018648787,0.000010751552,0.57050246,0.00011687605,0.000108159315,4.89202e-7,0.00016161638,0.23678896,0.000010449494,0.0068764933,0.1831044,0.00045445736],"about_ca_topic_score_codex":0.122095965,"about_ca_topic_score_gemma":0.07651565,"teacher_disagreement_score":0.17052726,"about_ca_system_score_codex":0.00057572284,"about_ca_system_score_gemma":0.0000847942,"threshold_uncertainty_score":0.99993116},"labels":[],"label_agreement":null},{"id":"W2985831459","doi":"10.4018/978-1-5225-9570-0.ch011","title":"Managing Cost of Quality in Supply Chains","year":2019,"lang":"en","type":"book-chapter","venue":"Advances in logistics, operations, and management science book series","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Competitor analysis; Quality (philosophy); Supply chain; Quality costs; Order (exchange); Business; Key (lock); Process (computing); Industrial organization; Marketing; Computer science; Risk analysis (engineering); Process management; Cost control; Finance","score_opus":0.025512657306497336,"score_gpt":0.2862287444490827,"score_spread":0.2607160871425854,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2985831459","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00019010156,0.00492933,0.0060888752,0.0017373762,0.0007883002,0.0014057856,0.000029876444,0.00007965243,0.9847507],"genre_scores_gemma":[0.19400944,0.14936931,0.008456648,0.0064181383,0.0008468804,0.00020129606,0.00036563925,0.0001537708,0.64017886],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9974773,0.0000115575585,0.00082455284,0.00076483353,0.00054594135,0.00037582693],"domain_scores_gemma":[0.99882513,0.000067304114,0.00035422365,0.0005370128,0.0001971476,0.000019197076],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012891958,0.00033335498,0.0005616375,0.0012898376,0.00025008759,0.00034759566,0.00057253015,0.000079044046,0.0000800346],"category_scores_gemma":[0.00026736833,0.00033859917,0.000058259116,0.00035696762,0.0012526159,0.004537342,0.0006175808,0.00019871304,0.000039928447],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019890016,0.000023884979,0.0049787816,0.0007479495,0.000014525738,0.000013546042,0.000048534886,0.019560816,0.000005249936,0.9677526,0.00009936402,0.006734887],"study_design_scores_gemma":[0.0015421868,0.00006152821,0.012986427,0.0025522443,0.00029065076,0.0000026378443,0.0023406534,0.025677495,0.000023186756,0.1296736,0.8228397,0.0020096882],"about_ca_topic_score_codex":0.0003530389,"about_ca_topic_score_gemma":0.004420711,"teacher_disagreement_score":0.838079,"about_ca_system_score_codex":0.0001358463,"about_ca_system_score_gemma":0.00005468413,"threshold_uncertainty_score":0.9999066},"labels":[],"label_agreement":null},{"id":"W2986404059","doi":"10.4018/978-1-5225-9570-0.ch028","title":"Multi-Tier Supplier Selection Using Total Cost of Ownership and Data Envelopment Analysis","year":2019,"lang":"en","type":"book-chapter","venue":"Advances in logistics, operations, and management science book series","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Data envelopment analysis; Supply chain; Purchasing; Total cost of ownership; Business; Total cost; Quality costs; Quality (philosophy); Supply chain management; Cost reduction; Industrial organization; Environmental economics; Operations research; Operations management; Economics; Marketing; Engineering; Activity-based costing","score_opus":0.05132274575425364,"score_gpt":0.29783868286777365,"score_spread":0.24651593711352002,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2986404059","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006948645,0.029655272,0.51963896,0.0019934191,0.0041339067,0.010072751,0.00066058745,0.00053550396,0.426361],"genre_scores_gemma":[0.32810307,0.12000642,0.19847816,0.00282934,0.0013791797,0.00015082152,0.0028051715,0.0002548955,0.34599292],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976567,0.000008995384,0.0005854621,0.0009754633,0.00047216142,0.0003012068],"domain_scores_gemma":[0.9988014,0.000040562016,0.00033291458,0.0005830499,0.00021646755,0.000025584124],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00085465563,0.00032543528,0.00051320216,0.0013774952,0.00042364845,0.00048523454,0.00047080364,0.000084023515,0.000053028496],"category_scores_gemma":[0.00016902242,0.00030794396,0.00004631691,0.00053038227,0.0010390915,0.005029055,0.001036012,0.00014617162,0.00000955447],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009942527,0.00014017292,0.03293357,0.0017695929,0.0009908628,0.000022426562,0.0002562168,0.28470668,0.00025734413,0.6518872,0.00034815187,0.026588371],"study_design_scores_gemma":[0.0011330611,0.000045425357,0.007903139,0.0006372553,0.0043593994,0.0000067353526,0.001372633,0.6952605,0.00007170849,0.0027548405,0.2846533,0.0018019928],"about_ca_topic_score_codex":0.00017309256,"about_ca_topic_score_gemma":0.0016550536,"teacher_disagreement_score":0.6491323,"about_ca_system_score_codex":0.000111582085,"about_ca_system_score_gemma":0.0000654901,"threshold_uncertainty_score":0.99993724},"labels":[],"label_agreement":null},{"id":"W3005394497","doi":"10.2737/fpl-rp-702","title":"Life-cycle cost analysis of a mass-timber building: methodology and hypothetical case study","year":2019,"lang":"en","type":"report","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"U.S. Forest Service; FPInnovations; U.S. Department of Agriculture","keywords":"Life-cycle cost analysis; Architectural engineering; Computer science; Environmental science; Engineering; Reliability engineering","score_opus":0.1604885012707539,"score_gpt":0.3712306068632463,"score_spread":0.21074210559249243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3005394497","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89782476,0.00032361902,0.007127856,0.00037252568,0.0007327595,0.0011449542,0.000027966958,0.0002065283,0.09223902],"genre_scores_gemma":[0.9891525,0.000051528103,0.0052318573,0.0006087239,0.0009043913,0.00004875137,0.00007353102,0.000111046436,0.0038176794],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99592304,0.00018478284,0.0012675659,0.0011213891,0.0010202258,0.0004829661],"domain_scores_gemma":[0.99509007,0.0013155265,0.0012610303,0.0011113717,0.0011477508,0.00007423306],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.004580823,0.00055584934,0.002494732,0.0028596516,0.00013868624,0.00028584394,0.00038078584,0.00041968282,0.001327616],"category_scores_gemma":[0.007214276,0.0004749742,0.0006858908,0.0027946606,0.00015665869,0.00028303478,0.00065594295,0.00046189866,0.00006621843],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008727081,0.0009735267,0.92864704,0.0011483934,0.033931464,0.0027298632,0.00018142974,0.0068079466,0.00006480298,0.00081940775,0.0146065345,0.010002327],"study_design_scores_gemma":[0.0053344155,0.00025638417,0.06944136,0.00032182463,0.38594097,0.0010979598,0.01899804,0.3957774,0.000022513004,0.001745344,0.115326785,0.0057370192],"about_ca_topic_score_codex":0.027828092,"about_ca_topic_score_gemma":0.0018408966,"teacher_disagreement_score":0.85920566,"about_ca_system_score_codex":0.00009248769,"about_ca_system_score_gemma":0.0002516283,"threshold_uncertainty_score":0.9997702},"labels":[],"label_agreement":null},{"id":"W3011898275","doi":"10.32438/ijet.1419","title":"Design, feasibility, performance assessment and optimization of the technical and financial viability of potential renewable energy and energy efficiency projects","year":2019,"lang":"en","type":"article","venue":"International Journal of Energy Technology","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Northern Alberta Institute of Technology","funders":"","keywords":"Renewable energy; Photovoltaic system; Energy conservation; Environmental economics; Zero-energy building; Primary energy; Energy security; Sustainability; Efficient energy use; Energy engineering; Solar power; Environmental science; Natural resource economics; Solar energy; Business; Engineering; Economics; Power (physics); Ecology","score_opus":0.01080826528151421,"score_gpt":0.23764736490384783,"score_spread":0.22683909962233362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3011898275","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.898917,0.00014462053,0.099510424,0.00077328336,0.00026317817,0.000040406532,9.542669e-7,0.000013762533,0.0003363272],"genre_scores_gemma":[0.99603707,0.00012881757,0.0035886427,0.000097690565,0.00009602386,0.0000028842676,0.0000014512573,0.000007921273,0.000039508155],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988375,0.000029891882,0.0004893585,0.00019260461,0.00033823933,0.000112455775],"domain_scores_gemma":[0.9983396,0.00006274281,0.0007453815,0.00016757565,0.0006750712,0.000009637081],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046118296,0.000110645706,0.00026068804,0.00049313786,0.000051748302,0.00003699353,0.0003677452,0.0001293435,0.000010865213],"category_scores_gemma":[0.00026818446,0.000082963394,0.000053585078,0.0003783886,0.00024484677,0.000258383,0.00042478088,0.000093724535,3.2401278e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004042956,0.0005701259,0.56465477,0.00012098361,0.00020817494,0.0000101854275,0.000021892762,0.33924994,0.042037703,0.03173776,0.00016189052,0.020822322],"study_design_scores_gemma":[0.004195543,0.00065616734,0.1131013,0.00058055273,0.0003816669,0.00033860072,0.00017857307,0.8322903,0.026955273,0.018906258,0.0018522505,0.00056351884],"about_ca_topic_score_codex":0.00037143374,"about_ca_topic_score_gemma":0.000072203664,"teacher_disagreement_score":0.49304035,"about_ca_system_score_codex":0.00005098779,"about_ca_system_score_gemma":0.000092465096,"threshold_uncertainty_score":0.3383149},"labels":[],"label_agreement":null},{"id":"W3045856964","doi":"","title":"Abstract for Recent Developments in Asset Management | Bulletin – June Quarter 2015","year":2015,"lang":"en","type":"article","venue":"Philadelphia Museum of Art Bulletin","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Asset (computer security); Business; Computer science; History; Computer security","score_opus":0.04314544012126173,"score_gpt":0.26429539482695535,"score_spread":0.22114995470569362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3045856964","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010299576,0.00027149683,0.0005371279,0.9558739,0.0017532584,0.0017742898,0.000025422903,0.0003431901,0.02912176],"genre_scores_gemma":[0.99112874,0.000063155836,0.004734318,0.002519075,0.00063861744,0.00019882897,0.000260612,0.00008505681,0.00037158924],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99695843,0.000024189507,0.0010408718,0.00064752204,0.0006778971,0.00065111305],"domain_scores_gemma":[0.9982586,0.00010296335,0.00057396665,0.0005153167,0.00048001742,0.00006914495],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0017020841,0.00038900707,0.0005649659,0.00076143217,0.00009595688,0.00016673638,0.00057783857,0.00012698048,0.00080150546],"category_scores_gemma":[0.0003851366,0.0003957827,0.00016485131,0.00067255745,0.00006484238,0.00021423429,0.00031097635,0.0002023642,0.0026550088],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019704593,0.00036432213,0.0022191945,0.00029255197,0.00012667416,0.000020891588,0.00007634116,0.00032286387,0.00005729992,0.00049974024,0.99550825,0.00031480225],"study_design_scores_gemma":[0.002278455,0.00001664061,0.009807988,0.0001905482,0.00009827775,0.0000014458118,0.00040206063,0.00021372062,0.000056957357,0.00041347896,0.98606366,0.0004567538],"about_ca_topic_score_codex":0.0002137526,"about_ca_topic_score_gemma":0.00009815762,"teacher_disagreement_score":0.9808292,"about_ca_system_score_codex":0.00013785587,"about_ca_system_score_gemma":0.000038858714,"threshold_uncertainty_score":0.9998494},"labels":[],"label_agreement":null},{"id":"W3082957089","doi":"","title":"Assessment of compressor compatibility with alternative working fluids to HFC-134a in domestic refrigerators.","year":2007,"lang":"en","type":"article","venue":"ICR 2007. Refrigeration Creates the Future. Proceedings of the 22<sup>nd </sup>IIR International Congress of Refrigeration.","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Refrigerant; Compatibility (geochemistry); Gas compressor; Refrigerator car; Environmental science; Materials science; Business; Thermodynamics; Composite material","score_opus":0.013673865392707174,"score_gpt":0.2745665302645757,"score_spread":0.2608926648718686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3082957089","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98364836,0.00020117023,0.0010057088,0.001980604,0.00091692596,0.0013214733,0.000047176454,0.0000821296,0.010796479],"genre_scores_gemma":[0.9935845,0.0000318491,0.003020162,0.00045812206,0.00202216,0.00008134757,0.00009055366,0.000068976624,0.0006423206],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99453,0.00007177314,0.002052417,0.00085493346,0.0019323367,0.00055851287],"domain_scores_gemma":[0.9933829,0.00047872882,0.0020861332,0.0006184566,0.003360004,0.000073781746],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0029878803,0.00061769894,0.0009261009,0.0010290203,0.00048640574,0.00057906756,0.0015204573,0.00022172653,0.00016696892],"category_scores_gemma":[0.000799617,0.000412677,0.00030637594,0.0017769979,0.0004250763,0.0016326982,0.00042186936,0.00059986237,0.000014459681],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002072436,0.0016694564,0.7259606,0.0008532883,0.0017196725,0.000025899253,0.003523297,0.15389867,0.021914346,0.074210785,0.011365987,0.0027855407],"study_design_scores_gemma":[0.010634516,0.0006978709,0.4345449,0.0059416983,0.0014133787,0.000102096084,0.013713266,0.40598464,0.07667613,0.008350474,0.038636383,0.0033046664],"about_ca_topic_score_codex":0.0006580948,"about_ca_topic_score_gemma":0.0003833677,"teacher_disagreement_score":0.29141572,"about_ca_system_score_codex":0.00038925718,"about_ca_system_score_gemma":0.00014508342,"threshold_uncertainty_score":0.9998325},"labels":[],"label_agreement":null},{"id":"W3108499284","doi":"10.5430/afr.v9n4p85","title":"Can Build-To-Rent Generate Affordable Housing Outcomes? A Whole-Life Costing Approach to Investment Analysis","year":2020,"lang":"en","type":"article","venue":"Accounting and Finance Research","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Affordable housing; Renting; Activity-based costing; Subsidy; Business; Finance; Investment (military); Rental housing; Equity (law); Public economics; Housing industry; Economics; Marketing; Economic growth","score_opus":0.09497826979284794,"score_gpt":0.312965744610774,"score_spread":0.21798747481792602,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3108499284","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97794944,0.00020023045,0.0032043909,0.014276364,0.0000775227,0.00058821036,0.0000121551475,0.0001928461,0.003498814],"genre_scores_gemma":[0.9792514,0.000021574753,0.0049891807,0.014153641,0.0010494605,0.00013581465,0.0000544803,0.000072960385,0.00027148437],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99544305,0.00007575223,0.0006534519,0.0012552402,0.001245259,0.0013272379],"domain_scores_gemma":[0.9980301,0.00019176125,0.00025903177,0.00060784427,0.0007425953,0.00016864725],"candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0028845035,0.00039672636,0.0007939871,0.0014677433,0.0010346643,0.0018687631,0.00073039334,0.000110613924,0.000013059981],"category_scores_gemma":[0.0029497412,0.00037304845,0.00020476899,0.009445059,0.00009621105,0.00065488485,0.0013144705,0.0005901134,0.00023805452],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008939867,0.00023702091,0.87565255,0.00048173495,0.0008724804,0.000031369218,0.0015420457,0.09192594,0.0018133696,0.0035189623,0.011733754,0.01210135],"study_design_scores_gemma":[0.0015130278,0.00008237909,0.1471258,0.00026388583,0.0010152892,0.0000016926591,0.0035660865,0.7451462,0.00015442312,0.00071646104,0.098524675,0.0018900685],"about_ca_topic_score_codex":0.0060333004,"about_ca_topic_score_gemma":0.0002757215,"teacher_disagreement_score":0.7285268,"about_ca_system_score_codex":0.00014215181,"about_ca_system_score_gemma":0.000111524605,"threshold_uncertainty_score":0.99987215},"labels":[],"label_agreement":null},{"id":"W3111949393","doi":"10.14288/1.0394833","title":"Whole building life cycle assessment for residential buildings : a design improvement framework","year":2020,"lang":"en","type":"article","venue":"Open Collections","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Architectural engineering; Building design; Environmental science; Engineering; Computer science","score_opus":0.039682471353187664,"score_gpt":0.2991490318437182,"score_spread":0.2594665604905306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3111949393","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025997304,0.000021198415,0.95627755,0.015583755,0.00055810664,0.0020794661,0.000017902441,0.00028180744,0.022580497],"genre_scores_gemma":[0.54189354,0.000010371006,0.4074014,0.023625929,0.007221801,0.0024657748,0.000060219485,0.00021098509,0.01710995],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99824494,0.000024431587,0.00043648694,0.0005912342,0.00030467013,0.00039826194],"domain_scores_gemma":[0.99877584,0.00025846198,0.00031348714,0.0002924451,0.0002910165,0.00006874747],"candidate_categories":["sts","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0006213545,0.00021920666,0.00033344,0.00015240151,0.003306369,0.0066625667,0.00073425245,0.00009105967,0.00064577354],"category_scores_gemma":[0.0016550715,0.00023707634,0.00017810009,0.0023280357,0.000029795683,0.0011417958,0.0006902291,0.00023228636,0.00004550788],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017487374,0.00019805887,0.00025457688,0.00011718881,0.0003793816,0.0000044362837,0.00008738208,0.025024451,0.0043415665,0.0035950877,0.96328735,0.002535653],"study_design_scores_gemma":[0.0029186308,0.00022084535,0.00036351348,0.00020664498,0.0010795442,0.0000011963832,0.0012264197,0.4872141,0.0009840208,0.04338396,0.46131793,0.0010832325],"about_ca_topic_score_codex":0.004515204,"about_ca_topic_score_gemma":0.00015420889,"teacher_disagreement_score":0.5488761,"about_ca_system_score_codex":0.00012564605,"about_ca_system_score_gemma":0.00018081504,"threshold_uncertainty_score":0.9979912},"labels":[],"label_agreement":null},{"id":"W3121760665","doi":"","title":"Review of international practices for determining medium-term resource needs of spending agencies","year":2015,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Activity-based costing; Term (time); Process (computing); Business; Sustainability; Medium term; Resource (disambiguation); Budget process; Strengths and weaknesses; Environmental economics; Public economics; Risk analysis (engineering); Operations management; Economics; Computer science; Accounting; Political science","score_opus":0.12769332317320065,"score_gpt":0.3808802229259122,"score_spread":0.2531868997527116,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121760665","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.70340466,0.008070014,0.000025154688,0.0020864436,0.0014226714,0.0020338027,0.00009243944,0.00008309958,0.28278172],"genre_scores_gemma":[0.91785276,0.072791435,0.0025224676,0.0006281269,0.0034386727,0.00033722242,0.0006022032,0.00016259617,0.0016645401],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9975601,0.00007793321,0.0011143179,0.00044035522,0.00042063146,0.0003867007],"domain_scores_gemma":[0.99488515,0.0010287758,0.0026296247,0.0007003788,0.0007255737,0.000030498384],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.007110821,0.00023132582,0.00075432286,0.0014040337,0.0000714848,0.00017687949,0.0012600003,0.00017920657,0.00008408141],"category_scores_gemma":[0.015673488,0.0002450576,0.00026805105,0.00032508638,0.00018609394,0.00046841093,0.0020114342,0.000582486,0.0000044236235],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005194726,0.00041941422,0.27349418,0.10129434,0.0018102255,0.00003175444,0.0017605522,0.007649689,0.0007157904,0.00093932863,0.0058809556,0.6054843],"study_design_scores_gemma":[0.002890958,0.00012199544,0.008981421,0.09015554,0.0009941434,0.000016070428,0.017809043,0.13996622,0.0006058994,0.0031987994,0.73311263,0.002147288],"about_ca_topic_score_codex":0.00019474012,"about_ca_topic_score_gemma":0.000089525754,"teacher_disagreement_score":0.7272317,"about_ca_system_score_codex":0.00036379232,"about_ca_system_score_gemma":0.00031463354,"threshold_uncertainty_score":0.99931586},"labels":[],"label_agreement":null},{"id":"W3123942850","doi":"","title":"An Ultra Energy-Efficient School in Quebec","year":2003,"lang":"en","type":"preprint","venue":"RePEc: Research Papers in Economics","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Greenhouse gas; Simple (philosophy); Efficient energy use; Energy (signal processing); Set (abstract data type); Architectural engineering; Environmental economics; Engineering; Computer science; Economics; Mathematics; Electrical engineering","score_opus":0.025250611528605475,"score_gpt":0.28520634078112317,"score_spread":0.2599557292525177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3123942850","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7942575,0.00009439185,0.000009654659,0.0004070451,0.00044386857,0.00037853888,0.000007859878,0.0000949066,0.20430619],"genre_scores_gemma":[0.9946848,0.0006251008,0.00013302895,0.0005066431,0.00095456664,0.00020280296,0.00014526914,0.00010912723,0.0026386748],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99592674,0.00020053372,0.0009304321,0.0014177059,0.0004399434,0.0010846196],"domain_scores_gemma":[0.9975162,0.00024253933,0.00035181857,0.0015651532,0.00023279616,0.0000914562],"candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0031922185,0.00043553475,0.00069303316,0.0022126772,0.0001821994,0.0011380117,0.0012515085,0.00047192504,0.0003054112],"category_scores_gemma":[0.0014936487,0.0004954751,0.00022337859,0.00070487324,0.00019348874,0.00043388922,0.00057892845,0.0017435162,0.000098694654],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011077808,0.0009791524,0.18667981,0.00048554357,0.00015511204,0.00015069373,0.00014555367,0.6025713,0.0003439016,0.0037322307,0.0004134069,0.20423251],"study_design_scores_gemma":[0.003202937,0.000045045213,0.11019923,0.0015944358,0.00011912238,0.0000058597125,0.004355456,0.72955954,0.00028241714,0.006996776,0.1399312,0.003708007],"about_ca_topic_score_codex":0.05092216,"about_ca_topic_score_gemma":0.059291992,"teacher_disagreement_score":0.20166752,"about_ca_system_score_codex":0.0016259137,"about_ca_system_score_gemma":0.0005416229,"threshold_uncertainty_score":0.9998989},"labels":[],"label_agreement":null},{"id":"W3169531117","doi":"10.1061/(asce)ae.1943-5568.0000470","title":"Innovative Construction Products: From Qualification and Performance Assessment to Quality Control","year":2021,"lang":"en","type":"article","venue":"Journal of Architectural Engineering","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Building envelope; Engineering; Quality (philosophy); Vendor; Risk analysis (engineering); Architectural engineering; Operations management; Business","score_opus":0.013905233792549827,"score_gpt":0.24524679664113216,"score_spread":0.23134156284858234,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3169531117","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9712154,0.000057952897,0.025553681,0.0027064325,0.00032116144,0.00005511198,0.0000021033954,0.000023661627,0.000064497544],"genre_scores_gemma":[0.9804044,0.000005358008,0.018334344,0.00026411994,0.00096740137,0.0000019923607,0.000006408698,0.000009882724,0.00000613612],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9990989,0.00001651398,0.0004276342,0.00013785649,0.00020184075,0.00011726191],"domain_scores_gemma":[0.9987341,0.00010341573,0.0003295164,0.00011074289,0.00070517045,0.000017040775],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004667876,0.00010318072,0.00022787921,0.00023416107,0.000056466397,0.0001358369,0.000080554455,0.000021592637,0.00000863069],"category_scores_gemma":[0.0010380857,0.0000900603,0.00003544007,0.0006746929,0.000014319051,0.0004305585,0.000044337696,0.00019779676,0.0000022704562],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002437835,0.000082725055,0.26082548,0.0005653837,0.0007187351,0.000024593985,0.0007062166,0.22878768,0.26303977,0.0039421795,0.000113806535,0.24094966],"study_design_scores_gemma":[0.0009310908,0.000027730595,0.9411788,0.00023482638,0.00010979191,0.00005217892,0.00034137274,0.050858945,0.0040164976,0.00021544709,0.0017552611,0.00027804976],"about_ca_topic_score_codex":0.000052665742,"about_ca_topic_score_gemma":0.0000037794355,"teacher_disagreement_score":0.68035334,"about_ca_system_score_codex":0.000047478516,"about_ca_system_score_gemma":0.000035240166,"threshold_uncertainty_score":0.36725524},"labels":[],"label_agreement":null},{"id":"W3178683931","doi":"10.47992/ijmts.2581.6012.0145","title":"Time and Cost Performance Status of Sikta Irrigation Contract","year":2021,"lang":"en","type":"article","venue":"International Journal of Management Technology and Social Sciences","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hatch (Canada)","funders":"","keywords":"Schedule; Business; Operations management; Documentation; Population; Government (linguistics); Project management; Irrigation; Earned value management; Project planning; Computer science; Economics; Management; Project charter","score_opus":0.01545331445725761,"score_gpt":0.26797176529857014,"score_spread":0.2525184508413125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3178683931","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9846627,0.0001790872,0.0000867087,0.0050596884,0.00017134026,0.000036670175,0.0000012179363,0.000013852115,0.009788739],"genre_scores_gemma":[0.9988707,0.00021114864,0.0003327179,0.0003349676,0.00014728006,8.364417e-7,0.000002235243,0.0000021920673,0.00009793829],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9992283,0.00000778072,0.0002366782,0.0001033262,0.00030668653,0.00011722452],"domain_scores_gemma":[0.99920005,0.000029623277,0.00038404495,0.000030611463,0.00035014044,0.000005551933],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044981248,0.000054888078,0.00012684587,0.0005080953,0.00015684598,0.00010727857,0.00021709477,0.00004122499,0.000039829873],"category_scores_gemma":[0.00011278329,0.000048293216,0.00003070702,0.00042835285,0.00038881582,0.0005771936,0.00017059813,0.000077328354,0.000003819103],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005889176,0.00014745447,0.45184916,0.00007888495,0.00051525125,0.000068161986,0.00021547111,0.00017120276,0.0010893497,0.17967355,0.0010508099,0.36508182],"study_design_scores_gemma":[0.003975872,0.00014012225,0.77849025,0.000511661,0.0007007422,0.000104831954,0.008258586,0.030167613,0.0017019851,0.0627415,0.112567924,0.0006388907],"about_ca_topic_score_codex":0.000019858517,"about_ca_topic_score_gemma":0.00001049368,"teacher_disagreement_score":0.3644429,"about_ca_system_score_codex":0.000019772424,"about_ca_system_score_gemma":0.000018953859,"threshold_uncertainty_score":0.19693401},"labels":[],"label_agreement":null},{"id":"W3216951831","doi":"10.32920/ryerson.14656851.v1","title":"Life cycle costing analysis using the mechanistic-empirical pavement design guide for flexible pavements","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Engineering; Overlay; Transport engineering; Pavement engineering; Life-cycle cost analysis; Life cycle costing; Activity-based costing; State highway; Directive; Civil engineering; Computer science; Asphalt; Reliability engineering; Business","score_opus":0.140312833263573,"score_gpt":0.34517449581830456,"score_spread":0.20486166255473157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3216951831","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025517002,0.00020093325,0.9677247,0.001848771,0.00079947733,0.0014567558,0.00002131649,0.00048599867,0.0019450653],"genre_scores_gemma":[0.8200509,0.00003584053,0.14796661,0.023507811,0.004471652,0.0006378275,0.0011544923,0.00025872773,0.0019161149],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99480486,0.00013964769,0.0015167195,0.0015277328,0.0010853603,0.00092566625],"domain_scores_gemma":[0.99495584,0.00075936597,0.0013474951,0.0015801124,0.0012644305,0.00009275255],"candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0033705155,0.0007682677,0.0012647961,0.00092594884,0.0010802742,0.0029212951,0.0012796996,0.00033035374,0.0007630631],"category_scores_gemma":[0.0039232406,0.0006093402,0.0012882004,0.0024557244,0.00007122867,0.00041230937,0.0030439685,0.0005258029,0.000042686654],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004815108,0.00038005083,0.0150442375,0.00087103964,0.0117567815,0.00002641753,0.00018197393,0.948364,0.000840096,0.0014016735,0.019243732,0.00184183],"study_design_scores_gemma":[0.00047109727,0.000007675218,0.00035237477,0.000177553,0.013565695,4.789641e-7,0.0015398273,0.97612727,0.00036697785,0.0028198767,0.003751029,0.0008201406],"about_ca_topic_score_codex":0.0039235717,"about_ca_topic_score_gemma":0.00028588017,"teacher_disagreement_score":0.81975806,"about_ca_system_score_codex":0.00035324707,"about_ca_system_score_gemma":0.00042222938,"threshold_uncertainty_score":0.9996358},"labels":[],"label_agreement":null},{"id":"W4210772107","doi":"10.1002/pse.130","title":"Editorial overview","year":2002,"lang":"en","type":"article","venue":"Progress in Structural Engineering and Materials","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Royal Military College of Canada","funders":"","keywords":"Library science; Engineering; Art history; Management; Art; Computer science","score_opus":0.014821038586900703,"score_gpt":0.2270227740942576,"score_spread":0.2122017355073569,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210772107","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97477454,0.0017171652,0.0000041457997,0.00015362537,0.022918122,0.00010432835,0.0000030449307,0.00019362646,0.00013137805],"genre_scores_gemma":[0.9639367,0.000044511242,0.00031968608,0.000048335703,0.03558817,0.00001938135,0.000007534878,0.000020156918,0.000015529371],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99919873,0.0000048655097,0.00022329186,0.00019333983,0.00014884656,0.00023090173],"domain_scores_gemma":[0.99974674,0.000017222774,0.000072727205,0.000117016585,0.000035074667,0.000011216199],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015850273,0.00014990613,0.0002261009,0.00014712411,0.00004630224,0.00033091247,0.000112026406,0.0000627029,0.00016974236],"category_scores_gemma":[0.000103683604,0.00013045745,0.000024231602,0.0002064298,0.000024284409,0.0004150383,0.000105203,0.00006729478,0.00002801755],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036134472,0.00028171827,0.21524982,0.019305479,0.0008848014,0.00028676927,0.0015144383,0.0068036485,0.04050488,0.16417105,0.124895595,0.42574045],"study_design_scores_gemma":[0.0070904777,0.000066464796,0.15276009,0.0019639179,0.00054470147,0.0000566156,0.00012770845,0.25598076,0.0046577803,0.0069649583,0.5651193,0.0046671988],"about_ca_topic_score_codex":0.00007316991,"about_ca_topic_score_gemma":0.0000019366773,"teacher_disagreement_score":0.44022372,"about_ca_system_score_codex":0.000013932887,"about_ca_system_score_gemma":0.0000010276544,"threshold_uncertainty_score":0.53199005},"labels":[],"label_agreement":null},{"id":"W4220974137","doi":"10.1061/9780784483978.051","title":"Cost Analysis of a Mass Timber Building Project: Comparison of Budgeted and Actual Construction Cost","year":2022,"lang":"en","type":"article","venue":"Construction Research Congress 2022","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cost estimate; Schedule; Cost database; Building construction; Cost analysis; Total cost; Construction industry; Cost engineering; Cost accounting; Construction management; Cost control; Relevant cost; Construction engineering; Engineering; Architectural engineering; Civil engineering; Operations management; Computer science; Business; Operations research","score_opus":0.0970793895241959,"score_gpt":0.38501022739242624,"score_spread":0.28793083786823037,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220974137","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99419975,0.00019689897,0.0011243968,0.00029209154,0.00063572597,0.0008455694,0.00013700538,0.000083576786,0.0024849956],"genre_scores_gemma":[0.99780315,0.000023998598,0.0014675043,0.000035950074,0.00014525042,0.00019433092,0.00017959083,0.000027582195,0.00012264178],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9962971,0.0003126865,0.00080906594,0.0005843021,0.0015354279,0.00046137502],"domain_scores_gemma":[0.9967586,0.000536238,0.0008194681,0.00046492243,0.0013826495,0.000038141723],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0022571012,0.00020761657,0.00074548105,0.0040445626,0.0008331996,0.00020454868,0.0004092608,0.00008148081,0.0015766722],"category_scores_gemma":[0.0011320796,0.00022946805,0.00020401856,0.008010827,0.0011180829,0.00053485145,0.0007801769,0.0006928757,0.0000049592663],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045974852,0.00020794368,0.898862,0.0003071518,0.002521078,0.000013288139,0.0003521365,0.01002089,0.010407498,0.014579904,0.004227736,0.058040623],"study_design_scores_gemma":[0.0038649861,0.00016727137,0.034324035,0.00012965083,0.0043725274,0.000046243855,0.061012942,0.834046,0.004672695,0.0018015119,0.054469094,0.0010930585],"about_ca_topic_score_codex":0.0014906595,"about_ca_topic_score_gemma":0.00012780594,"teacher_disagreement_score":0.86453795,"about_ca_system_score_codex":0.00018352998,"about_ca_system_score_gemma":0.00016179531,"threshold_uncertainty_score":0.999336},"labels":[],"label_agreement":null},{"id":"W4236081256","doi":"10.18280/ijsdp.160220","title":"Possibilities of Increasing of Energy Efficiency in a Small Enterprises - Case Study","year":2021,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"European Regional Development Fund; Kultúrna a Edukacná Grantová Agentúra MŠVVaŠ SR; Agentúra na Podporu Výskumu a Vývoja; Ministerstvo školstva, vedy, výskumu a športu Slovenskej republiky","keywords":"Environmental economics; Work (physics); Energy consumption; Electricity; Statistic; Consumption (sociology); Order (exchange); Efficient energy use; Process (computing); Production (economics); Legislation; Business; Risk analysis (engineering); Computer science; Economics; Engineering; Microeconomics; Mechanical engineering","score_opus":0.019288196607060243,"score_gpt":0.25259542729092144,"score_spread":0.2333072306838612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236081256","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9982002,0.00045773268,0.00048312722,0.00003856628,0.00011972747,0.00003432026,3.602366e-7,0.0000040082878,0.0006619978],"genre_scores_gemma":[0.9989387,0.0000060053603,0.000757594,0.000048747243,0.00012481007,0.0000012158899,0.0000033787965,0.0000064978153,0.000113067894],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99874187,0.000032529995,0.0006925803,0.00011357816,0.00027987926,0.00013958463],"domain_scores_gemma":[0.99771386,0.00019586277,0.0005891557,0.000054189448,0.0014350913,0.000011812111],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009644642,0.000094975745,0.00025118803,0.0008646755,0.000053092645,0.00011293008,0.00016542415,0.000024885989,0.000014909282],"category_scores_gemma":[0.00085640413,0.00008895246,0.0000468862,0.0003641231,0.000026599782,0.0004369571,0.00020189228,0.00008371545,1.0412371e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015891274,0.00033694098,0.9594207,0.00014215907,0.0002297353,0.026938332,0.008204177,0.0011955079,0.000107203436,0.00062464055,0.000014422842,0.0026272978],"study_design_scores_gemma":[0.002624887,0.000056487977,0.17467947,0.0012030439,0.00014558808,0.0016503202,0.8138227,0.0015761352,0.0017851399,0.0012457999,0.0008796825,0.0003307714],"about_ca_topic_score_codex":0.002198105,"about_ca_topic_score_gemma":0.00011596962,"teacher_disagreement_score":0.8056185,"about_ca_system_score_codex":0.00006774867,"about_ca_system_score_gemma":0.00018979804,"threshold_uncertainty_score":0.36273763},"labels":[],"label_agreement":null},{"id":"W4238559787","doi":"10.1177/0361198118758030","title":"Life-Cycle Cost Adjustment Factors in Alternate Design/Alternative Bid Pavement Bids: Added Value or Added Controversy?","year":2018,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bidding; Value (mathematics); Economics; Operations research; Business; Engineering; Microeconomics; Mathematics; Statistics","score_opus":0.13974648347316831,"score_gpt":0.37569311492535995,"score_spread":0.23594663145219164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4238559787","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9903129,0.00009977865,0.0029250646,0.0032769886,0.0010648381,0.0019421295,0.000051348637,0.000045263376,0.0002816923],"genre_scores_gemma":[0.9961437,0.00042405748,0.000755168,0.0004979206,0.0014123701,0.0001293948,0.000036214547,0.00008733947,0.0005138457],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99088335,0.0009050069,0.0018932567,0.0006566549,0.0043926933,0.0012690251],"domain_scores_gemma":[0.9920872,0.0015625663,0.0010320714,0.000586624,0.0044566244,0.00027492436],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.006358932,0.00041473986,0.0007244116,0.0025501193,0.00067827007,0.0004089145,0.0016120232,0.00017371969,0.0015685742],"category_scores_gemma":[0.0015520242,0.00028922773,0.00043797126,0.0039489097,0.0006773838,0.0017230252,0.000029660781,0.0016840143,0.00015239866],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.01374368,0.0018365113,0.89412284,0.0007217712,0.001655052,0.00056841987,0.008283607,0.02373571,0.0061836545,0.005497832,0.029436816,0.01421412],"study_design_scores_gemma":[0.007745805,0.0008284501,0.9466724,0.00109238,0.00025127153,3.743493e-7,0.006359285,0.01322134,0.0034249837,0.00518116,0.014603612,0.00061898],"about_ca_topic_score_codex":0.042526823,"about_ca_topic_score_gemma":0.06242151,"teacher_disagreement_score":0.05254953,"about_ca_system_score_codex":0.0005346603,"about_ca_system_score_gemma":0.00075550325,"threshold_uncertainty_score":0.999956},"labels":[],"label_agreement":null},{"id":"W4240476096","doi":"10.1007/978-3-662-53120-4_300216","title":"Environmental Improvement Cost","year":2019,"lang":"en","type":"book-chapter","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Environmental science; Business","score_opus":0.013906299196114583,"score_gpt":0.18524667812930606,"score_spread":0.17134037893319148,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4240476096","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00040528952,0.00007827953,0.000075392054,0.0002581432,0.00046807894,0.00044879643,0.000014146176,0.00016281799,0.9980891],"genre_scores_gemma":[0.033625416,0.000035772016,0.000043281983,0.004526933,0.0019654136,0.0000092605715,0.00030008322,0.0001166901,0.95937717],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983948,9.39952e-7,0.00035843608,0.0005280782,0.00044693923,0.0002708392],"domain_scores_gemma":[0.9989789,0.00002503977,0.0003809368,0.0005733786,0.000027792046,0.000013925416],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00014854995,0.00039590546,0.00038427132,0.00028706552,0.000092180955,0.0002430962,0.00033564636,0.00019789135,0.015913272],"category_scores_gemma":[0.000012891832,0.00036458063,0.00027756425,0.000027368978,0.00004801963,0.0003335346,0.00047023996,0.00024727738,0.031976216],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004222051,0.00013679772,0.0045216186,0.000540446,0.0011897195,0.0000640693,0.000012746693,0.00009118526,0.0006282217,0.5066742,0.22328678,0.26281205],"study_design_scores_gemma":[0.00027732775,0.0000069636003,0.0001721085,0.000056435434,0.0003374435,5.194282e-7,0.000016362063,0.00067696325,0.000012143626,0.0032697439,0.99464446,0.00052954647],"about_ca_topic_score_codex":0.00012865501,"about_ca_topic_score_gemma":0.000032598433,"teacher_disagreement_score":0.77135766,"about_ca_system_score_codex":0.00013396463,"about_ca_system_score_gemma":0.000016598278,"threshold_uncertainty_score":0.9998806},"labels":[],"label_agreement":null},{"id":"W4243334665","doi":"10.1002/nba.30344","title":"Many nonprofits vulnerable to uncertainty due to low operating reserves","year":2017,"lang":"en","type":"article","venue":"Nonprofit Business Advisor","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Market liquidity; Business; Quarter (Canadian coin); Citation; Great recession; Finance; Economics; Political science; Geography; Labour economics","score_opus":0.028881030444330904,"score_gpt":0.27432467004450745,"score_spread":0.24544363960017654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4243334665","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95457447,0.000041420928,0.0031775108,0.018118272,0.00151568,0.0010823737,0.000016516035,0.0004284511,0.021045335],"genre_scores_gemma":[0.979903,0.000003801074,0.0027601565,0.003989903,0.004358327,0.00032989006,0.000057434412,0.00015637653,0.008441133],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9960362,0.000042575513,0.0007866771,0.0012320899,0.0007937959,0.0011086902],"domain_scores_gemma":[0.99509376,0.00011378387,0.0005752638,0.002201583,0.001883668,0.00013191899],"candidate_categories":["metaepi_narrow","sts","scholarly_communication","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0015238313,0.0006056614,0.0008162307,0.00064186903,0.0030914685,0.003049855,0.0021628388,0.00018017678,0.0005849781],"category_scores_gemma":[0.007362663,0.0005635406,0.00018703369,0.0016218547,0.000095116935,0.0027764393,0.0018069937,0.0004079255,0.003840079],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00085892476,0.0009813966,0.56496245,0.0039052318,0.00064594194,0.0006659484,0.00079007423,0.123015225,0.045263115,0.007742266,0.1512198,0.09994962],"study_design_scores_gemma":[0.0021761602,0.000046054694,0.87449855,0.001796233,0.00029400334,0.000009972833,0.00058959326,0.04276666,0.0019143771,0.00048679553,0.07286733,0.0025542476],"about_ca_topic_score_codex":0.012420144,"about_ca_topic_score_gemma":0.0014328501,"teacher_disagreement_score":0.30953613,"about_ca_system_score_codex":0.00012615918,"about_ca_system_score_gemma":0.000093613395,"threshold_uncertainty_score":0.9996816},"labels":[],"label_agreement":null},{"id":"W4246038617","doi":"10.1504/ijsa.2016.080244","title":"Feasibility of green composite aircraft wing projects for unmanned aircraft vehicles","year":2016,"lang":"en","type":"article","venue":"International Journal of Sustainable Aviation","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Activity-based costing; Durability; Fuel efficiency; Aeronautics; Life cycle costing; Environmental science; Engineering; Automotive engineering; Transport engineering; Computer science; Business","score_opus":0.025127805244976185,"score_gpt":0.2744238027676145,"score_spread":0.24929599752263834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246038617","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97252685,0.00004472011,0.019526254,0.006976361,0.00032600615,0.00028044335,0.0000059589147,0.000029058949,0.0002843554],"genre_scores_gemma":[0.99687725,0.0000057825887,0.00085068884,0.0002754541,0.0012502323,0.000010506385,0.000010865842,0.00001890276,0.0007003235],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9982896,0.000024100038,0.00069068995,0.00017087135,0.0006048921,0.00021986688],"domain_scores_gemma":[0.99376136,0.00022364559,0.0012375815,0.00013173852,0.0046282685,0.000017430644],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00114141,0.00012829002,0.00025117633,0.000676496,0.000094076946,0.00013173201,0.00044666172,0.000057027664,0.00002776459],"category_scores_gemma":[0.0013290495,0.00009734401,0.0002220569,0.00030157383,0.00004667623,0.0022454706,0.00012103219,0.00007467733,0.0000070622414],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012360805,0.0004184203,0.93673635,0.00046363662,0.0006235131,0.00007076285,0.00034089666,0.0009315043,0.022398647,0.017056752,0.0024591917,0.017264245],"study_design_scores_gemma":[0.01448027,0.00029761653,0.7928473,0.0016108142,0.0010203391,0.000051654188,0.0064660516,0.011710955,0.013258427,0.13776849,0.019463792,0.0010243389],"about_ca_topic_score_codex":0.0005234436,"about_ca_topic_score_gemma":0.000022331558,"teacher_disagreement_score":0.1438891,"about_ca_system_score_codex":0.00034006007,"about_ca_system_score_gemma":0.000099046454,"threshold_uncertainty_score":0.39695737},"labels":[],"label_agreement":null},{"id":"W4246988611","doi":"10.32920/ryerson.14656851","title":"Life cycle costing analysis using the mechanistic-empirical pavement design guide for flexible pavements","year":2021,"lang":"en","type":"preprint","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Engineering; Overlay; Transport engineering; Life-cycle cost analysis; Pavement engineering; Activity-based costing; Life cycle costing; State highway; Directive; Civil engineering; Computer science; Asphalt; Reliability engineering; Business","score_opus":0.140312833263573,"score_gpt":0.34517449581830456,"score_spread":0.20486166255473157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246988611","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025517002,0.00020093325,0.9677247,0.001848771,0.00079947733,0.0014567558,0.00002131649,0.00048599867,0.0019450653],"genre_scores_gemma":[0.8200509,0.00003584053,0.14796661,0.023507811,0.004471652,0.0006378275,0.0011544923,0.00025872773,0.0019161149],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99480486,0.00013964769,0.0015167195,0.0015277328,0.0010853603,0.00092566625],"domain_scores_gemma":[0.99495584,0.00075936597,0.0013474951,0.0015801124,0.0012644305,0.00009275255],"candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0033705155,0.0007682677,0.0012647961,0.00092594884,0.0010802742,0.0029212951,0.0012796996,0.00033035374,0.0007630631],"category_scores_gemma":[0.0039232406,0.0006093402,0.0012882004,0.0024557244,0.00007122867,0.00041230937,0.0030439685,0.0005258029,0.000042686654],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004815108,0.00038005083,0.0150442375,0.00087103964,0.0117567815,0.00002641753,0.00018197393,0.948364,0.000840096,0.0014016735,0.019243732,0.00184183],"study_design_scores_gemma":[0.00047109727,0.000007675218,0.00035237477,0.000177553,0.013565695,4.789641e-7,0.0015398273,0.97612727,0.00036697785,0.0028198767,0.003751029,0.0008201406],"about_ca_topic_score_codex":0.0039235717,"about_ca_topic_score_gemma":0.00028588017,"teacher_disagreement_score":0.81975806,"about_ca_system_score_codex":0.00035324707,"about_ca_system_score_gemma":0.00042222938,"threshold_uncertainty_score":0.9996358},"labels":[],"label_agreement":null},{"id":"W4252612491","doi":"10.1504/ijpd.2016.083624","title":"Life-cycle costing of an aircraft wing project with innovative materials using an eco-demonstrator","year":2016,"lang":"en","type":"article","venue":"International Journal of Product Development","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Activity-based costing; Life cycle costing; Cost driver; Engineering; Process (computing); Systems engineering; Manufacturing engineering; Transport engineering; Computer science; Business","score_opus":0.03873166319522733,"score_gpt":0.2848560346973472,"score_spread":0.24612437150211988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4252612491","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9958341,0.000014821327,0.0024966965,0.0007506094,0.0005752737,0.0001418379,0.000004321498,0.000027978496,0.00015434735],"genre_scores_gemma":[0.97051054,0.0000018445791,0.027252479,0.00026670776,0.0019046507,0.0000033466804,0.000009846241,0.000030658815,0.000019920977],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99766093,0.000041679006,0.0009901169,0.00027794347,0.0008151584,0.00021415511],"domain_scores_gemma":[0.9949678,0.00004628672,0.0016478698,0.00016032063,0.0031432088,0.00003451949],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014888757,0.0001965433,0.00033307046,0.00077263213,0.00009989772,0.00022551238,0.00054325105,0.00003334696,0.000078172205],"category_scores_gemma":[0.0013275,0.00013017682,0.000037972848,0.0005197911,0.00006961341,0.002678,0.00013032708,0.00009586964,0.000007055743],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010171065,0.0009708557,0.17569233,0.00018148345,0.0020705552,0.0002147806,0.0013748592,0.0013647911,0.70282227,0.0004859889,0.00034986134,0.1134551],"study_design_scores_gemma":[0.007920324,0.00035069734,0.26263997,0.006388024,0.0005354316,0.0005816926,0.0037482537,0.002206327,0.70222175,0.0012309236,0.009933757,0.0022428494],"about_ca_topic_score_codex":0.00011488193,"about_ca_topic_score_gemma":0.000021716605,"teacher_disagreement_score":0.111212246,"about_ca_system_score_codex":0.00018129122,"about_ca_system_score_gemma":0.0007645939,"threshold_uncertainty_score":0.53084564},"labels":[],"label_agreement":null},{"id":"W4253752090","doi":"10.6028/nist.sp.1098","title":"Benefits of using ASTM building economics standards for the design, construction, and operation of constructed facilities","year":2012,"lang":"en","type":"report","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"National Institute of Standards and Technology","keywords":"Architectural engineering; Construction engineering; Building design; Engineering; Business; Risk analysis (engineering); Forensic engineering","score_opus":0.10393134950120142,"score_gpt":0.28439627965048975,"score_spread":0.18046493014928833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4253752090","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61492866,0.004617156,0.3683522,0.00015089057,0.0023980555,0.0018163997,0.0010220996,0.00011243613,0.006602064],"genre_scores_gemma":[0.9515405,0.0011866743,0.04433684,0.000054640404,0.0023032716,0.000034347144,0.00013982672,0.000084886866,0.00031898668],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984304,0.000014802125,0.0007797461,0.00025039725,0.0003294242,0.0001952513],"domain_scores_gemma":[0.99582845,0.0003599429,0.0011483502,0.0002510533,0.0024020711,0.000010106751],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019080555,0.00023649087,0.0005924508,0.0003262007,0.0002315962,0.00018335138,0.00014948186,0.00016715516,0.00012176106],"category_scores_gemma":[0.0010831241,0.00018250523,0.00013493412,0.00016748144,0.0002801155,0.00057919003,0.0001312299,0.000096068194,2.9009482e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039015288,0.00012214335,0.26459706,0.01670549,0.006342588,4.528934e-7,0.000509465,0.23034808,0.0020515167,0.11348791,0.008466054,0.3569791],"study_design_scores_gemma":[0.007146064,0.00012695178,0.018749094,0.004697881,0.023962485,0.0002245941,0.022754498,0.54994655,0.018373018,0.009888319,0.33862287,0.0055076806],"about_ca_topic_score_codex":0.0022633949,"about_ca_topic_score_gemma":0.000101519356,"teacher_disagreement_score":0.35147142,"about_ca_system_score_codex":0.00012462855,"about_ca_system_score_gemma":0.00047145147,"threshold_uncertainty_score":0.74423474},"labels":[],"label_agreement":null},{"id":"W4288426668","doi":"10.1061/9780784484289.006","title":"How Can I Convince Finance to Fund My Asset Management Program?","year":2022,"lang":"en","type":"article","venue":"Pipelines 2022","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Finance; Business; IT asset management; Asset management; Revenue; Cash flow; Asset (computer security); Current asset; Debt; Economics; Market liquidity; Computer science","score_opus":0.027884946949060043,"score_gpt":0.2529921689199672,"score_spread":0.22510722197090713,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4288426668","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83623624,0.00097453105,0.0022695563,0.10828202,0.004147234,0.0038905449,0.00019014507,0.0021926786,0.04181707],"genre_scores_gemma":[0.96408564,0.000018819317,0.0015245267,0.007947917,0.0013689798,0.0010073918,0.00025324753,0.000067563225,0.023725903],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9978875,0.000028879345,0.00029169297,0.0006196145,0.0006711566,0.000501156],"domain_scores_gemma":[0.9989795,0.000036666243,0.00023179232,0.00057948206,0.0001472357,0.000025304398],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00052900816,0.00025043212,0.00027634628,0.00041186402,0.0006036455,0.00059115485,0.0007390868,0.000024311914,0.00045682478],"category_scores_gemma":[0.00013483083,0.00026909233,0.00013490501,0.0019894673,0.000030620646,0.00033507604,0.0014285616,0.00022503988,0.00018608621],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011189553,0.00071317604,0.06271083,0.00046806227,0.00026228695,0.00034666076,0.0001392621,0.008754668,0.00022388059,0.011489001,0.57250375,0.34227654],"study_design_scores_gemma":[0.0003570613,0.000019512412,0.0051738587,0.000015111029,0.00012276758,0.000002669991,0.00092307857,0.011860786,0.000010746645,0.00037582355,0.98075867,0.0003799363],"about_ca_topic_score_codex":0.00048345717,"about_ca_topic_score_gemma":0.00027869665,"teacher_disagreement_score":0.40825492,"about_ca_system_score_codex":0.00013038432,"about_ca_system_score_gemma":0.000019518347,"threshold_uncertainty_score":0.9999761},"labels":[],"label_agreement":null},{"id":"W4295530084","doi":"10.1016/j.ress.2022.108810","title":"Assessing the impact of maintenance practices on asset's sustainability","year":2022,"lang":"en","type":"article","venue":"Reliability Engineering & System Safety","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":35,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Sustainability; Asset (computer security); Business; Risk analysis (engineering); Environmental resource management; Computer science; Economics; Computer security","score_opus":0.013432338156313383,"score_gpt":0.2793139112017763,"score_spread":0.2658815730454629,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4295530084","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9909414,0.000056246332,0.0028306495,0.0014851515,0.00049074827,0.0006897528,0.000015736961,0.0004191929,0.003071117],"genre_scores_gemma":[0.99932456,0.0000010630873,0.0000995519,0.000048104943,0.00034812023,0.000080083104,0.000016186026,0.000041702187,0.000040600476],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974458,0.00016632554,0.00075591815,0.0005141518,0.00066516077,0.00045259303],"domain_scores_gemma":[0.99597347,0.0010963586,0.0011919674,0.0011842909,0.000530575,0.000023312612],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005911891,0.00028480554,0.00048559322,0.0002097202,0.00052562554,0.00027701384,0.00065481744,0.000053088963,0.00005801444],"category_scores_gemma":[0.007068486,0.00020382988,0.0004290116,0.0013584861,0.000054820604,0.00092160515,0.00034662668,0.00053203467,0.000012390872],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000065574255,0.0001443716,0.08719823,0.0011535973,0.00010679909,0.000007915438,0.00006260715,0.90683854,0.00013222554,0.003237904,0.00047680887,0.0005754337],"study_design_scores_gemma":[0.00040833547,0.00004665163,0.39157835,0.00017384221,0.00016949355,0.000011441193,0.0033620691,0.5966731,0.000014839818,0.00017773735,0.006987426,0.00039674997],"about_ca_topic_score_codex":0.0051066573,"about_ca_topic_score_gemma":0.0000042490456,"teacher_disagreement_score":0.31016546,"about_ca_system_score_codex":0.0019460794,"about_ca_system_score_gemma":0.00015636264,"threshold_uncertainty_score":0.84621483},"labels":[],"label_agreement":null},{"id":"W4308091341","doi":"10.1109/ccece49351.2022.9918265","title":"Return on Investment Evaluation and Optimal Sizing of Behind-the-Meter Battery Energy Storage Systems in Large Commercial Buildings in Ontario","year":2022,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Sizing; Metre; Battery (electricity); Investment (military); Energy storage; Electrical engineering; Return on investment; Automotive engineering; Computer science; Architectural engineering; Engineering; Environmental economics; Environmental science; Economics; Production (economics); Microeconomics","score_opus":0.029724667358486435,"score_gpt":0.23558477229798205,"score_spread":0.2058601049394956,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4308091341","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9963089,0.00009468505,0.00010830737,0.0005657408,0.0002028908,0.00020775406,0.0000014310817,0.000016845604,0.0024934062],"genre_scores_gemma":[0.99688387,9.935048e-7,0.00004687325,0.0026150928,0.00011503974,0.00008247786,0.00003547615,0.000014812934,0.00020537601],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99847925,0.000115186915,0.00040196782,0.00026653535,0.0005225899,0.00021448426],"domain_scores_gemma":[0.9993785,0.000108658576,0.00024446475,0.00019999979,0.000060165945,0.000008214557],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023745152,0.0001313888,0.00024134215,0.0005199455,0.00016109478,0.0001244703,0.00018070599,0.00003354746,0.00023061663],"category_scores_gemma":[0.00009823494,0.000113904076,0.00004762356,0.00036240136,0.000020250596,0.00032654058,0.00035439938,0.00023453699,0.000001880019],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012259117,0.00034318844,0.8976804,0.00007820741,0.00008102896,0.000018691984,0.0018885433,0.08984734,0.00049501535,0.0054249815,0.0019949686,0.002025045],"study_design_scores_gemma":[0.0026475221,0.00006074804,0.3017346,0.0001615792,0.00021932473,0.0000025230893,0.0033363565,0.67249656,0.00005809918,0.00030074455,0.018531168,0.0004507718],"about_ca_topic_score_codex":0.20175827,"about_ca_topic_score_gemma":0.1400162,"teacher_disagreement_score":0.5959458,"about_ca_system_score_codex":0.00041152278,"about_ca_system_score_gemma":0.000038726186,"threshold_uncertainty_score":0.8756763},"labels":[],"label_agreement":null},{"id":"W4311169078","doi":"10.1088/1755-1315/1101/5/052011","title":"Exploring the synergies between Life Cycle cost / Whole Life Cost and Building Information Modeling: A Systematic Literature Review","year":2022,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; GDG Environnement","funders":"","keywords":"Building information modeling; Context (archaeology); Product life-cycle management; Risk analysis (engineering); Life-cycle cost analysis; Asset (computer security); Computer science; Activity-based costing; Identification (biology); Asset management; Process management; Life-cycle assessment; Externality; Management science; Operations management; Business; Engineering; Production (economics); Economics; Marketing","score_opus":0.03764619123368495,"score_gpt":0.21357278894305326,"score_spread":0.1759265977093683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4311169078","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9929794,0.003954887,0.000189949,0.0017493055,0.000108206514,0.0006164374,0.000025016208,0.00005420697,0.00032256942],"genre_scores_gemma":[0.9944417,0.0035992914,0.000054989978,0.0015587674,0.00008828729,0.00018669291,0.000038295202,0.0000072871735,0.000024702029],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984403,0.000035340905,0.00035534817,0.00028612185,0.0005703553,0.00031251818],"domain_scores_gemma":[0.999381,0.000046584002,0.0002098395,0.0002603694,0.000030899253,0.00007127445],"candidate_categories":["sts","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.00100784,0.00017870092,0.0002759391,0.00015301545,0.0015926316,0.0011554691,0.00038217485,0.000015863037,0.00004083072],"category_scores_gemma":[0.0004094164,0.0001355732,0.000037757956,0.00066185027,0.00032491237,0.0057687936,0.0008080632,0.00020385791,0.000017141028],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043249954,0.00047151378,0.14554581,0.22204827,0.0009323161,0.00010454996,0.03331679,0.22300772,0.025473474,0.04347612,0.0017602227,0.3034307],"study_design_scores_gemma":[0.001596712,0.00016583958,0.07820318,0.027523406,0.0010628909,0.000113502065,0.07519814,0.77763987,0.0004670994,0.00073160755,0.034481175,0.0028165586],"about_ca_topic_score_codex":0.0000760081,"about_ca_topic_score_gemma":0.0000069883813,"teacher_disagreement_score":0.5546321,"about_ca_system_score_codex":0.000027123386,"about_ca_system_score_gemma":0.000032794607,"threshold_uncertainty_score":0.99988145},"labels":[],"label_agreement":null},{"id":"W4362725653","doi":"10.1007/978-981-16-1634-1_11","title":"Appendix: Data Sources and Methodologies","year":2023,"lang":"en","type":"book-chapter","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"The King's University; Western University","funders":"","keywords":"Real estate; Estate; Computer science; Data science; Statistical analysis; Engineering; Business; Finance; Statistics; Mathematics","score_opus":0.24945863081224687,"score_gpt":0.3183675527772382,"score_spread":0.06890892196499135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4362725653","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00007108247,0.00043108242,0.00085436297,0.001375397,0.00034372922,0.00014065515,0.000031842785,0.0010201475,0.9957317],"genre_scores_gemma":[0.00027350005,0.00029270072,0.0026920792,0.0012903508,0.002370697,0.0000032064045,0.0013393161,0.00012994473,0.9916082],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984803,0.000006477542,0.00029880556,0.0007140594,0.000279678,0.00022066041],"domain_scores_gemma":[0.9981491,0.00042359246,0.00031085944,0.001029952,0.000076220575,0.000010301648],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0010159571,0.00031156937,0.00047080897,0.00047566261,0.0001558801,0.00053668173,0.0008430026,0.00020049159,0.001139699],"category_scores_gemma":[0.00080790673,0.00025931947,0.00007965019,0.00009142002,0.000112493166,0.00056561973,0.0031604343,0.00023359431,0.0054580155],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017753402,0.0000074132718,0.0027186326,0.00082087156,0.0010324178,0.00008884909,0.000022398517,0.000024233404,0.000009375652,0.52069455,0.380454,0.09410952],"study_design_scores_gemma":[0.000108050204,0.0000020298887,0.0002418028,0.00012604665,0.00070839125,0.0000015658775,0.0001132802,0.0014271924,0.00000131969,0.09432879,0.9024475,0.000493981],"about_ca_topic_score_codex":0.00051477225,"about_ca_topic_score_gemma":0.00030128704,"teacher_disagreement_score":0.5219935,"about_ca_system_score_codex":0.000008239028,"about_ca_system_score_gemma":0.000010454695,"threshold_uncertainty_score":0.9999859},"labels":[],"label_agreement":null},{"id":"W4385344155","doi":"10.5539/mas.v17n2p13","title":"Aircraft Ground Support Equipment: A Framework for Maintenance Strategies","year":2023,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Downtime; Standardization; Aircraft maintenance; Business; Service (business); Aviation; Asset (computer security); Operations management; Computer science; Marketing; Engineering; Computer security; Aeronautics","score_opus":0.03726412641887565,"score_gpt":0.2803485829836084,"score_spread":0.2430844565647327,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385344155","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14093037,0.000011056674,0.81360984,0.0019479449,0.0005233899,0.0006365476,0.000006520253,0.0010775008,0.04125682],"genre_scores_gemma":[0.9926105,0.000002520045,0.004537499,0.0015614092,0.00051576697,0.00016785317,0.000018234443,0.00003069198,0.0005555153],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9975618,0.0000021390263,0.0002692045,0.00070298434,0.0006484959,0.0008153876],"domain_scores_gemma":[0.9990354,0.00010740962,0.00017629427,0.0004674305,0.00018226946,0.000031193853],"candidate_categories":["scholarly_communication","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0013589133,0.0001944152,0.00021712128,0.00045424828,0.00073315075,0.0013023299,0.0009152159,0.000059900904,0.00004899743],"category_scores_gemma":[0.00028432018,0.00017969214,0.00008423448,0.002605048,0.00036886387,0.0012051708,0.00041286065,0.00013356369,0.0007988672],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005548006,0.000076444565,0.0013482627,0.00025961667,0.00003573438,0.000014253263,0.0006653195,0.0050261654,0.039094254,0.92547685,0.00671683,0.021230815],"study_design_scores_gemma":[0.0003032898,0.0000073404963,0.0033321579,0.000038835333,0.000043615837,6.894795e-7,0.001260258,0.37166357,0.00016441046,0.6152889,0.0075129895,0.0003839324],"about_ca_topic_score_codex":0.00006718078,"about_ca_topic_score_gemma":0.000021651573,"teacher_disagreement_score":0.85168016,"about_ca_system_score_codex":0.000069795155,"about_ca_system_score_gemma":0.00012244124,"threshold_uncertainty_score":0.99997914},"labels":[],"label_agreement":null},{"id":"W4387719991","doi":"10.1093/hebz/9780198844808.003.0015","title":"Budgeting","year":2020,"lang":"en","type":"book-chapter","venue":"Accounting","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Variance (accounting); Inflation (cosmology); CITES; Computer science; Operations research; Process (computing); Accounting; Operations management; Economics; Engineering; Programming language","score_opus":0.022937946701148907,"score_gpt":0.2019658840627718,"score_spread":0.1790279373616229,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387719991","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00041483113,0.00032584093,0.000091142814,0.0017956956,0.0006340306,0.00019312953,0.0000042256443,0.00080854114,0.99573255],"genre_scores_gemma":[0.35679334,0.00007236924,0.0015152659,0.04327271,0.06840086,0.000035602257,0.00074404746,0.0013490837,0.5278167],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9973,0.0000032304617,0.0007086785,0.00085133006,0.0006700127,0.0004667195],"domain_scores_gemma":[0.99779195,0.00012559151,0.0011618002,0.0005286552,0.00036823328,0.00002375944],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00048679917,0.0006050409,0.0006951202,0.00048388046,0.00037910012,0.0009931793,0.00071284454,0.0003359481,0.0013196666],"category_scores_gemma":[0.0008206087,0.00065133837,0.00041850694,0.00022589107,0.000067719324,0.0010081267,0.0008207671,0.00077913457,0.010858418],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004447804,0.000036516733,0.0112478165,0.0021783602,0.0010746939,0.0004391459,0.00009834602,0.0001608493,0.00034541247,0.6958737,0.20741867,0.08108206],"study_design_scores_gemma":[0.00020193178,0.0000025703077,0.0001225346,0.00042322848,0.0005665747,0.0000029536513,0.00003824363,0.0029929576,0.0000049945393,0.018401766,0.97634095,0.0009012784],"about_ca_topic_score_codex":0.00022342567,"about_ca_topic_score_gemma":0.000034398985,"teacher_disagreement_score":0.76892227,"about_ca_system_score_codex":0.00008450971,"about_ca_system_score_gemma":0.0000452444,"threshold_uncertainty_score":0.9995938},"labels":[],"label_agreement":null},{"id":"W4388376394","doi":"10.1080/13467581.2023.2278461","title":"Assessing life cycle cost and environmental impact for office building construction in Saudi Arabia","year":2023,"lang":"en","type":"article","venue":"Journal of Asian Architecture and Building Engineering","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"King Saud University","keywords":"Glazing; Masonry; Building envelope; Architectural engineering; Engineering; Life-cycle assessment; Cladding (metalworking); Reinforced concrete; Sustainability; Software; Life-cycle cost analysis; Environmental impact assessment; Civil engineering; Construction engineering; Computer science; Reliability engineering; Structural engineering; Production (economics)","score_opus":0.009278814597773912,"score_gpt":0.23995316844783263,"score_spread":0.23067435385005872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388376394","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9716087,0.0001959943,0.027360654,0.00046011928,0.0001815451,0.00011029089,0.000002732183,0.00004981334,0.000030127294],"genre_scores_gemma":[0.98796755,0.0000268019,0.011063127,0.00006516514,0.0008355393,0.000002898652,0.000004734679,0.000032358752,0.0000018250516],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9989903,0.000008281513,0.00036221754,0.00017747164,0.0001726723,0.00028907027],"domain_scores_gemma":[0.99942935,0.00015476259,0.00027037723,0.000075538854,0.00002252696,0.00004745128],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058652903,0.00017756819,0.0003051808,0.0009444476,0.000115234885,0.00036844303,0.000098558914,0.0000611911,0.000003744763],"category_scores_gemma":[0.00042936936,0.00015844915,0.00010737709,0.00045070902,0.000031107622,0.00069715147,0.000074818476,0.000285547,6.398089e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000121917124,0.000041332547,0.08972377,0.0006024906,0.00027454155,0.00007624371,0.0003083699,0.6029827,0.10336548,0.00030383465,0.00020224333,0.20199709],"study_design_scores_gemma":[0.0023003255,0.000057600206,0.54610085,0.0012694763,0.00029851153,0.00033472755,0.0009982443,0.44372272,0.0006072414,0.0013135525,0.002309552,0.0006872198],"about_ca_topic_score_codex":0.000021670892,"about_ca_topic_score_gemma":0.0000033800654,"teacher_disagreement_score":0.45637706,"about_ca_system_score_codex":0.00006148412,"about_ca_system_score_gemma":0.000015893902,"threshold_uncertainty_score":0.6461369},"labels":[],"label_agreement":null},{"id":"W4388488066","doi":"10.1007/978-3-031-44652-8_3","title":"Life Cycle Approach: An Introductory Overview","year":2023,"lang":"en","type":"book-chapter","venue":"Synthesis lectures on sustainable development","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Balanced scorecard; Life cycle costing; Sustainability; Engineering; Process management; Life-cycle cost analysis; Product life-cycle management; Life-cycle assessment; Perspective (graphical); Computer science; Systems engineering; Operations management; Management science; Reliability engineering; Economics; Artificial intelligence; Mechanical engineering; Production (economics); Ecology; Biology","score_opus":0.03445405375530644,"score_gpt":0.22806752769955163,"score_spread":0.1936134739442452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388488066","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013169368,0.0014048222,0.00019563385,0.0021134107,0.00077983714,0.0014448502,0.000009983604,0.0019888864,0.99074566],"genre_scores_gemma":[0.03433173,0.00037585705,0.0015223734,0.012013249,0.0085974075,0.00065792724,0.0007093352,0.0012072427,0.9405849],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99503165,0.000041884214,0.00092035555,0.0015935365,0.0012736241,0.0011389168],"domain_scores_gemma":[0.996888,0.0002997029,0.00074963993,0.0012859035,0.0006382429,0.00013851425],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0014932135,0.001081665,0.0011852592,0.0019838214,0.00081512745,0.0008379155,0.0010919892,0.00052991847,0.0012185615],"category_scores_gemma":[0.003200428,0.0010148203,0.00035960288,0.00051137456,0.00011468185,0.0005740414,0.0007114645,0.0007119998,0.002521523],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035063046,0.00055282284,0.00014282338,0.010512094,0.0034546114,0.0008197218,0.00078056747,0.009877211,0.000011472704,0.616315,0.23211919,0.12506387],"study_design_scores_gemma":[0.00020327613,0.000012082189,0.00051955256,0.00040863227,0.0004952837,0.0000019721933,0.0006767504,0.000470309,0.000037461465,0.016376004,0.9791692,0.0016294991],"about_ca_topic_score_codex":0.00022607783,"about_ca_topic_score_gemma":0.0000498046,"teacher_disagreement_score":0.74705,"about_ca_system_score_codex":0.000698398,"about_ca_system_score_gemma":0.0007562412,"threshold_uncertainty_score":0.99969447},"labels":[],"label_agreement":null},{"id":"W4391617776","doi":"10.1007/s12008-023-01622-z","title":"Interactive design on the product life cycle costs: a case study","year":2024,"lang":"en","type":"article","venue":"International Journal on Interactive Design and Manufacturing (IJIDeM)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Profitability index; Component (thermodynamics); Context (archaeology); Product (mathematics); Computer science; Train; Reliability (semiconductor); Product lifecycle; Reliability engineering; Industrial engineering; Systems engineering; Manufacturing engineering; Risk analysis (engineering); Operations research; Engineering; New product development","score_opus":0.04269718965670009,"score_gpt":0.29937375760713336,"score_spread":0.25667656795043325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391617776","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95206755,0.0001453294,0.027032496,0.011765541,0.0047059697,0.0011096597,0.0000075736893,0.00025727428,0.002908597],"genre_scores_gemma":[0.99134815,0.000031844364,0.00021914944,0.0046562077,0.0032394545,0.00008080072,0.0000037244142,0.00007131949,0.00034937717],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99715984,0.00033508096,0.0006283341,0.0006850805,0.00083006226,0.00036161958],"domain_scores_gemma":[0.9958243,0.0029115183,0.00047125114,0.0002915801,0.00042764505,0.000073746436],"candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0018722479,0.00045655036,0.0003452826,0.001055289,0.000515818,0.0032639944,0.0006433347,0.00005630226,0.00042311795],"category_scores_gemma":[0.0017204972,0.00030563673,0.00023004386,0.00021654936,0.00007336925,0.0019138604,0.00026367512,0.0013028468,0.00046785478],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.01692656,0.007388385,0.003170928,0.0002506597,0.029945264,0.13115312,0.016271217,0.124603055,0.002778259,0.010048746,0.18043247,0.47703132],"study_design_scores_gemma":[0.012247021,0.0037578484,0.017268438,0.011639114,0.00446402,0.032506123,0.090132244,0.59227103,0.04636914,0.034739874,0.14742196,0.007183197],"about_ca_topic_score_codex":0.0005797589,"about_ca_topic_score_gemma":0.00002269046,"teacher_disagreement_score":0.46984813,"about_ca_system_score_codex":0.0005212426,"about_ca_system_score_gemma":0.00007248859,"threshold_uncertainty_score":0.99993956},"labels":[],"label_agreement":null},{"id":"W4391890452","doi":"10.1016/b978-0-323-95122-7.00002-2","title":"Life cycle thinking and its application to the built environment","year":2024,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Computer science","score_opus":0.014011184451461031,"score_gpt":0.21446830467302325,"score_spread":0.2004571202215622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391890452","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003955375,0.0026517045,0.000043262637,0.00446247,0.00022979217,0.0007509048,0.000007166501,0.00017426729,0.9912849],"genre_scores_gemma":[0.02872372,0.00009077072,0.00005614318,0.008891544,0.0037735617,0.00014161557,0.000033972898,0.00015153208,0.95813715],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99833685,0.000004807765,0.000361417,0.0006090604,0.00045332997,0.00023450394],"domain_scores_gemma":[0.99906254,0.000046615074,0.00023853238,0.00056012505,0.000048103127,0.00004407455],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0004705299,0.00035674902,0.00032405477,0.00023882231,0.0002933037,0.00044285963,0.0004414962,0.00015058904,0.00012236646],"category_scores_gemma":[0.00006570372,0.00027211235,0.00015193495,0.000038095513,0.000039374467,0.0001071255,0.0007985788,0.00036083444,0.0048271315],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000054286365,0.000004824801,0.000023251238,0.00026707348,0.00020672554,0.0000074282,0.00014401267,0.00016878017,0.000024910107,0.053553376,0.000976241,0.9446179],"study_design_scores_gemma":[0.00005653157,0.000002908398,0.00003782125,0.00022660174,0.0005169204,0.0000011572125,0.000014950931,0.0020987494,0.0000026224682,0.03172848,0.9649974,0.0003158655],"about_ca_topic_score_codex":0.000009554545,"about_ca_topic_score_gemma":0.000042378117,"teacher_disagreement_score":0.96402115,"about_ca_system_score_codex":0.00005741622,"about_ca_system_score_gemma":0.000018711775,"threshold_uncertainty_score":0.9999731},"labels":[],"label_agreement":null},{"id":"W4391974664","doi":"10.1007/978-3-031-52391-5","title":"Advances in Asset Management: Strategies, Technologies, and Industry Applications","year":2024,"lang":"en","type":"book","venue":"Engineering asset management review","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Asset management; Business; Asset (computer security); Risk analysis (engineering); Engineering management; Computer science; Engineering; Finance; Computer security","score_opus":0.008275668372060814,"score_gpt":0.2364614728188137,"score_spread":0.22818580444675288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391974664","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000035044593,0.3649356,0.0016849105,0.0008422144,0.00030028957,0.0022775535,0.000020822383,0.0017391518,0.62819594],"genre_scores_gemma":[0.00084807957,0.7854171,0.0031688276,0.0010969036,0.0011574818,0.0035996353,0.001596427,0.0004561947,0.20265937],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99684197,0.00001032707,0.00089905673,0.0011354003,0.00053122744,0.0005820285],"domain_scores_gemma":[0.99843216,0.000055081036,0.00038860383,0.0010401562,0.000058769063,0.000025224428],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007719655,0.00080245244,0.0009771422,0.0016988171,0.000087038796,0.0007344364,0.0009224327,0.00043811114,0.000077343524],"category_scores_gemma":[0.000043086282,0.0008191346,0.00019716262,0.0018384038,0.00005689772,0.001075567,0.0012365353,0.0014161575,0.00053504895],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017848756,0.000052852032,0.00011835174,0.17519794,0.0005418224,0.00035684864,0.000002147394,0.0010847425,2.6135402e-7,0.38779458,0.13653111,0.29831755],"study_design_scores_gemma":[0.00014683136,0.000003060911,0.00007326196,0.022849279,0.0013240036,0.0000043544333,0.00006734669,0.0010833181,6.541733e-8,0.008048783,0.96563995,0.0007597244],"about_ca_topic_score_codex":0.000013149274,"about_ca_topic_score_gemma":0.000021816786,"teacher_disagreement_score":0.82910883,"about_ca_system_score_codex":0.00028081666,"about_ca_system_score_gemma":0.0000288577,"threshold_uncertainty_score":0.99942595},"labels":[],"label_agreement":null},{"id":"W4392910865","doi":"10.32920/25412734.v1","title":"Decision-making Model of Distribution Watermains Renewal With Lining and Replacement Techniques","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University; Toronto Public Health","funders":"","keywords":"Legislation; Asset management; Asset (computer security); IT asset management; Legislature; Investment (military); Business; Service (business); Key (lock); Financial plan; Integrated business planning; Estimation; Operations research; Computer science; Operations management; Finance; Engineering; Marketing; Systems engineering; Computer security","score_opus":0.018361162994573424,"score_gpt":0.26182675527372934,"score_spread":0.24346559227915593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392910865","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8017264,0.00020296586,0.18165113,0.0005925588,0.00020383854,0.00046683595,0.00004534081,0.000734609,0.014376321],"genre_scores_gemma":[0.98037606,0.000035883197,0.018650003,0.00014643454,0.0003563247,0.000037485246,0.00016848752,0.000042244323,0.00018708542],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982284,0.000007443463,0.0005245009,0.0006322327,0.00039064485,0.00021681165],"domain_scores_gemma":[0.9987539,0.0000737885,0.00040080983,0.0004870111,0.00027329862,0.0000111897425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066562154,0.00029382674,0.00041595765,0.00034152184,0.000101919606,0.00046469385,0.00023180628,0.0001688831,0.000021564621],"category_scores_gemma":[0.00019614366,0.00021837452,0.00010705634,0.00026883683,0.0000592187,0.00018072574,0.0024257654,0.00034829916,0.0000069304747],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022506097,0.000707407,0.10989368,0.020881189,0.0034954723,0.00016935352,0.0011231606,0.24571237,0.0026255099,0.06256878,0.028546553,0.5220259],"study_design_scores_gemma":[0.00015518704,0.000016288275,0.00012225885,0.0049539288,0.0007694756,0.000002088399,0.00013689855,0.9132854,0.00053070916,0.07899659,0.00053244643,0.000498771],"about_ca_topic_score_codex":0.0004261394,"about_ca_topic_score_gemma":0.000102145576,"teacher_disagreement_score":0.667573,"about_ca_system_score_codex":0.0000702376,"about_ca_system_score_gemma":0.000049461647,"threshold_uncertainty_score":0.8905055},"labels":[],"label_agreement":null},{"id":"W4392910925","doi":"10.32920/25412734","title":"Decision-making Model of Distribution Watermains Renewal With Lining and Replacement Techniques","year":2024,"lang":"en","type":"preprint","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University; Toronto Public Health","funders":"","keywords":"Legislation; Asset management; Asset (computer security); Investment (military); Legislature; IT asset management; Business; Service (business); Key (lock); Financial plan; Estimation; Integrated business planning; Operations research; Computer science; Finance; Operations management; Engineering; Marketing; Systems engineering; Computer security","score_opus":0.018361162994573424,"score_gpt":0.26182675527372934,"score_spread":0.24346559227915593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392910925","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8017264,0.00020296586,0.18165113,0.0005925588,0.00020383854,0.00046683595,0.00004534081,0.000734609,0.014376321],"genre_scores_gemma":[0.98037606,0.000035883197,0.018650003,0.00014643454,0.0003563247,0.000037485246,0.00016848752,0.000042244323,0.00018708542],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982284,0.000007443463,0.0005245009,0.0006322327,0.00039064485,0.00021681165],"domain_scores_gemma":[0.9987539,0.0000737885,0.00040080983,0.0004870111,0.00027329862,0.0000111897425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066562154,0.00029382674,0.00041595765,0.00034152184,0.000101919606,0.00046469385,0.00023180628,0.0001688831,0.000021564621],"category_scores_gemma":[0.00019614366,0.00021837452,0.00010705634,0.00026883683,0.0000592187,0.00018072574,0.0024257654,0.00034829916,0.0000069304747],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022506097,0.000707407,0.10989368,0.020881189,0.0034954723,0.00016935352,0.0011231606,0.24571237,0.0026255099,0.06256878,0.028546553,0.5220259],"study_design_scores_gemma":[0.00015518704,0.000016288275,0.00012225885,0.0049539288,0.0007694756,0.000002088399,0.00013689855,0.9132854,0.00053070916,0.07899659,0.00053244643,0.000498771],"about_ca_topic_score_codex":0.0004261394,"about_ca_topic_score_gemma":0.000102145576,"teacher_disagreement_score":0.667573,"about_ca_system_score_codex":0.0000702376,"about_ca_system_score_gemma":0.000049461647,"threshold_uncertainty_score":0.8905055},"labels":[],"label_agreement":null},{"id":"W4399426987","doi":"10.47456/bjpe.v10i2.44372","title":"Avaliação do ciclo de vida de ferrovias de carga: uma análise crítica e uma proposta de diretriz","year":2024,"lang":"pt","type":"article","venue":"Brazilian Journal of Production Engineering","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Context (archaeology); Humanities; Philosophy; Geography","score_opus":0.013207484994928968,"score_gpt":0.24256605492573277,"score_spread":0.2293585699308038,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399426987","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9088131,0.014434475,0.05880482,0.0113022365,0.0054138717,0.00039685454,0.000007827479,0.00048567087,0.0003411167],"genre_scores_gemma":[0.9825281,0.00037032817,0.0053611547,0.00017452987,0.009501087,0.000009188021,0.000006262579,0.00019619195,0.0018531934],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99632204,0.000104932406,0.001112197,0.0006199874,0.00069496967,0.0011458667],"domain_scores_gemma":[0.99794215,0.0001215722,0.0005339788,0.0005148444,0.0006560502,0.00023142615],"candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0038563265,0.00054688065,0.00063341693,0.0016149635,0.00030763366,0.0015654855,0.0006182944,0.000246196,0.00029530431],"category_scores_gemma":[0.004932494,0.0005721535,0.0005277719,0.0022165338,0.0000734151,0.001976389,0.00016354708,0.001283176,0.00010410601],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048390782,0.0007334914,0.09513759,0.0145595325,0.003850386,0.0036345643,0.00839706,0.5451209,0.12476679,0.0010044646,0.082323365,0.11998796],"study_design_scores_gemma":[0.0015106024,0.00019101091,0.034632098,0.009031099,0.004566995,0.0034565555,0.002389191,0.8441779,0.0127349645,0.0006605681,0.084473275,0.0021757144],"about_ca_topic_score_codex":0.00013113221,"about_ca_topic_score_gemma":0.000010465466,"teacher_disagreement_score":0.29905704,"about_ca_system_score_codex":0.0013350232,"about_ca_system_score_gemma":0.000609366,"threshold_uncertainty_score":0.999673},"labels":[],"label_agreement":null},{"id":"W4399843459","doi":"10.1016/j.trd.2024.104295","title":"Life cycle costing analysis of a retrofitted hydrogen-powered locomotive: Canadian context","year":2024,"lang":"en","type":"article","venue":"Transportation Research Part D Transport and Environment","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Transport Canada","keywords":"Context (archaeology); Activity-based costing; Life cycle costing; Engineering; Life-cycle cost analysis; Aeronautics; Transport engineering; Automotive engineering; Business; Geography; Reliability engineering; Accounting","score_opus":0.038353110150301524,"score_gpt":0.2755126112532011,"score_spread":0.23715950110289957,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399843459","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99499124,0.00085132645,0.00038257838,0.0016777328,0.000066099245,0.0003844209,0.00017070299,0.00009265452,0.0013832484],"genre_scores_gemma":[0.9978415,0.00031264173,0.000039739738,0.00027801289,0.00013346024,0.000058192458,0.0011148285,0.00004076,0.00018088456],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99724174,0.000033865414,0.0006739496,0.0006220185,0.0008393196,0.0005891321],"domain_scores_gemma":[0.99915457,0.00012691683,0.000100612,0.00030635236,0.00010422598,0.00020731486],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0012120422,0.00023844352,0.00047564364,0.0017542666,0.00029837005,0.000102085905,0.00020389151,0.00011620699,0.0018406688],"category_scores_gemma":[0.000051094146,0.00023855944,0.00026664842,0.002340294,0.0002660701,0.00048159453,0.000007955103,0.00033734224,0.00010938048],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000085973115,0.000135282,0.97170264,0.0005433677,0.0028228639,0.00022237242,0.0012101335,0.011740566,0.0005425707,0.0035406428,0.00060271606,0.006850892],"study_design_scores_gemma":[0.0005074758,0.000028494489,0.8942814,0.00017251773,0.0024981464,2.3669557e-7,0.0011160136,0.03797774,0.0001068326,0.00029849188,0.06261367,0.000399008],"about_ca_topic_score_codex":0.10291816,"about_ca_topic_score_gemma":0.11692431,"teacher_disagreement_score":0.07742125,"about_ca_system_score_codex":0.00009722712,"about_ca_system_score_gemma":0.00012723525,"threshold_uncertainty_score":0.9990718},"labels":[],"label_agreement":null},{"id":"W4402953603","doi":"","title":"Unveiling the synergy: integration of time-driven activity based costing with social life cycle assessment","year":2024,"lang":"en","type":"article","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Technische Universität Berlin; Kungliga Tekniska Högskolan; Aalborg Universitet; Sveriges Lantbruksuniversitet; Polytechnique Montréal; Deakin University; Universidade Tecnológica Federal do Paraná; RWTH Aachen University; Instituto Federal do Rio Grande do Sul; Australian Government","keywords":"Activity-based costing; Life cycle costing; Computer science; Business; Engineering; Operations management; Accounting","score_opus":0.013285464499255262,"score_gpt":0.23272523760130048,"score_spread":0.2194397731020452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402953603","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71814144,0.000088406836,0.21537891,0.018755298,0.000092978255,0.000252771,0.000008379126,0.0003860769,0.04689573],"genre_scores_gemma":[0.9947358,0.0000046663035,0.004186184,0.00019233394,0.00009756122,0.00002290722,0.00008210025,0.000032205306,0.0006462484],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99809587,0.0006615198,0.00028164184,0.0003462845,0.0004110289,0.00020366721],"domain_scores_gemma":[0.9967959,0.001278694,0.00032833492,0.0005129615,0.0010629145,0.000021204994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033311239,0.00016839195,0.0002092131,0.0001966526,0.00051554764,0.00067545165,0.00044684234,0.000060955466,0.0001397773],"category_scores_gemma":[0.0011711591,0.00012774431,0.00012783904,0.0010803574,0.00014789523,0.0005083943,0.00019430013,0.00026395335,0.00004666513],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015987764,0.0027976553,0.031074993,0.0017059228,0.0012640787,0.000027259486,0.008062867,0.02320687,0.1411771,0.27204692,0.007672879,0.5108036],"study_design_scores_gemma":[0.00026508543,2.3577431e-7,0.0077301045,0.0007508619,0.00013797122,5.3546694e-7,0.00017048274,0.98450667,0.0039977473,0.00023809857,0.0020275093,0.00017472712],"about_ca_topic_score_codex":0.0015556596,"about_ca_topic_score_gemma":0.00082093244,"teacher_disagreement_score":0.9612998,"about_ca_system_score_codex":0.00007527937,"about_ca_system_score_gemma":0.00015966524,"threshold_uncertainty_score":0.6513396},"labels":[],"label_agreement":null},{"id":"W4403711992","doi":"10.20944/preprints202410.1766.v1","title":"The Urban Building Energy Retrofitting Tool: An Open-Source Framework to Help Foster Building Retrofitting Using a Life Cycle Costing Perspective. First Results for Montréal","year":2024,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Retrofitting; Perspective (graphical); Life cycle costing; Activity-based costing; Architectural engineering; Business; Construction engineering; Computer science; Engineering; Marketing","score_opus":0.09479946846012463,"score_gpt":0.3398012419377451,"score_spread":0.24500177347762045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403711992","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95163316,0.0009276098,0.029624315,0.008505273,0.0025553762,0.0021775982,0.000050526047,0.0013271942,0.00319895],"genre_scores_gemma":[0.96460646,0.000030442672,0.020561893,0.002500841,0.0106578125,0.0005080231,0.000055302786,0.00054574694,0.0005334966],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9901417,0.00027102814,0.0024480599,0.0040689353,0.0011831238,0.0018871598],"domain_scores_gemma":[0.9897053,0.002640813,0.0023960995,0.0034689466,0.001560049,0.0002287942],"candidate_categories":["metaresearch","metaepi_narrow","sts","scholarly_communication","open_science","research_integrity"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.009895061,0.0013259731,0.0014732049,0.00097655214,0.003618066,0.005168891,0.0042785187,0.0008170179,0.000030743053],"category_scores_gemma":[0.04494209,0.0012747385,0.000763102,0.0019240745,0.00015045864,0.0013000972,0.025931332,0.002574061,0.00015068465],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0040254705,0.000709185,0.37536845,0.004420952,0.0052401344,0.00019564148,0.013727927,0.4596675,0.018054575,0.08663049,0.006331795,0.025627857],"study_design_scores_gemma":[0.0018750742,0.00006371474,0.008445329,0.0119515415,0.0023070977,0.000017301525,0.01098243,0.8430508,0.0022578684,0.058247387,0.056564987,0.004236465],"about_ca_topic_score_codex":0.021392081,"about_ca_topic_score_gemma":0.00081023265,"teacher_disagreement_score":0.3833833,"about_ca_system_score_codex":0.0013938869,"about_ca_system_score_gemma":0.00027965658,"threshold_uncertainty_score":0.99994916},"labels":[],"label_agreement":null},{"id":"W4405336536","doi":"10.20944/preprints202410.1766.v2","title":"The Urban Building Energy Retrofitting Tool: An Open-Source Framework to Help Foster Building Retrofitting Using a Life Cycle Costing Perspective. First Results for Montréal","year":2024,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Retrofitting; Activity-based costing; Architectural engineering; Life cycle costing; Investment (military); Perspective (graphical); Scalability; Computer science; Environmental economics; Transport engineering; Engineering; Business; Economics","score_opus":0.09479946846012463,"score_gpt":0.3398012419377451,"score_spread":0.24500177347762045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405336536","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95163316,0.0009276098,0.029624315,0.008505273,0.0025553762,0.0021775982,0.000050526047,0.0013271942,0.00319895],"genre_scores_gemma":[0.96460646,0.000030442672,0.020561893,0.002500841,0.0106578125,0.0005080231,0.000055302786,0.00054574694,0.0005334966],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9901417,0.00027102814,0.0024480599,0.0040689353,0.0011831238,0.0018871598],"domain_scores_gemma":[0.9897053,0.002640813,0.0023960995,0.0034689466,0.001560049,0.0002287942],"candidate_categories":["metaresearch","metaepi_narrow","sts","scholarly_communication","open_science","research_integrity"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.009895061,0.0013259731,0.0014732049,0.00097655214,0.003618066,0.005168891,0.0042785187,0.0008170179,0.000030743053],"category_scores_gemma":[0.04494209,0.0012747385,0.000763102,0.0019240745,0.00015045864,0.0013000972,0.025931332,0.002574061,0.00015068465],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0040254705,0.000709185,0.37536845,0.004420952,0.0052401344,0.00019564148,0.013727927,0.4596675,0.018054575,0.08663049,0.006331795,0.025627857],"study_design_scores_gemma":[0.0018750742,0.00006371474,0.008445329,0.0119515415,0.0023070977,0.000017301525,0.01098243,0.8430508,0.0022578684,0.058247387,0.056564987,0.004236465],"about_ca_topic_score_codex":0.021392081,"about_ca_topic_score_gemma":0.00081023265,"teacher_disagreement_score":0.3833833,"about_ca_system_score_codex":0.0013938869,"about_ca_system_score_gemma":0.00027965658,"threshold_uncertainty_score":0.99994916},"labels":[],"label_agreement":null},{"id":"W4406642494","doi":"10.20944/preprints202410.1766.v3","title":"The Urban Building Energy Retrofitting Tool: An Open-Source Framework to Help Foster Building Retrofitting Using a Life Cycle Costing Perspective. First Results for Montréal","year":2025,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Concordia University","keywords":"Retrofitting; Perspective (graphical); Activity-based costing; Architectural engineering; Life cycle costing; Energy (signal processing); Business; Construction engineering; Engineering; Computer science; Marketing; Structural engineering","score_opus":0.09276066678319196,"score_gpt":0.3417687550261163,"score_spread":0.24900808824292436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406642494","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89717066,0.00053434586,0.08462753,0.007313101,0.002111504,0.002506948,0.000064085834,0.0010682608,0.0046035647],"genre_scores_gemma":[0.95757705,0.000033650962,0.029992215,0.0035915487,0.007118614,0.00052251935,0.00006537898,0.00030496524,0.0007940322],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99049276,0.00032680872,0.00247602,0.0037872868,0.0010743476,0.0018427859],"domain_scores_gemma":[0.98772717,0.0034003225,0.002934644,0.003760208,0.0019748749,0.00020276589],"candidate_categories":["metaresearch","metaepi_narrow","sts","scholarly_communication","open_science"],"consensus_categories":[],"category_scores_codex":[0.009417711,0.0012734176,0.0015537675,0.0009876088,0.004455818,0.0035571074,0.0048442436,0.00083214557,0.000026091766],"category_scores_gemma":[0.060277466,0.0012708026,0.0007049877,0.0019452045,0.00014345141,0.0015630927,0.020656027,0.0020527514,0.00004727859],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0030577213,0.000524796,0.5294179,0.0019867106,0.0027649165,0.000051248873,0.006186137,0.38917366,0.0057468433,0.041893862,0.0029643753,0.016231855],"study_design_scores_gemma":[0.0031094248,0.000063631014,0.020097025,0.01282504,0.0022393847,0.000009135731,0.011587666,0.8388065,0.0026973702,0.026161836,0.07776422,0.004638727],"about_ca_topic_score_codex":0.025777692,"about_ca_topic_score_gemma":0.00093951816,"teacher_disagreement_score":0.50932086,"about_ca_system_score_codex":0.0013540472,"about_ca_system_score_gemma":0.00033282008,"threshold_uncertainty_score":0.99897414},"labels":[],"label_agreement":null},{"id":"W4409556111","doi":"10.5006/c2005-05232","title":"Corrosion Resistance of UNS N04400 vs Electroless Nickel in Simulated Marine Service","year":2005,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Royal Military College of Canada","funders":"","keywords":"Corrosion; Nickel; Metallurgy; Materials science; Service life; Composite material","score_opus":0.009702840089703572,"score_gpt":0.21750987547451092,"score_spread":0.20780703538480735,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409556111","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9637517,0.000038283935,0.00018880214,0.0038318555,0.000041138584,0.00011686409,7.034515e-7,0.0001297613,0.031900916],"genre_scores_gemma":[0.99295276,0.000009218362,0.00034292767,0.0030714702,0.0002298594,0.0000024539802,0.00003473341,0.000023280156,0.0033332834],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877244,0.00001253046,0.00042057098,0.00027316954,0.0002416661,0.00027964055],"domain_scores_gemma":[0.99911636,0.00006317429,0.00022565738,0.0003184016,0.00026607534,0.000010358888],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003112952,0.00015079125,0.00027764574,0.00032091697,0.000055507,0.00006324735,0.0002804867,0.00006750155,0.0004055031],"category_scores_gemma":[0.00011579852,0.00014151567,0.000059890186,0.001677001,0.000016411159,0.00053285976,0.00019525114,0.00013040226,0.00020509608],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011319943,0.0009612401,0.84127283,0.0010747766,0.00008972616,0.00002221808,0.00014888689,0.08329796,0.042629506,0.009805814,0.01173384,0.007831216],"study_design_scores_gemma":[0.004077265,0.00001691576,0.17176837,0.00039959615,0.00027141452,8.115378e-7,0.00025434195,0.75516254,0.0077125276,0.0017686792,0.057582088,0.0009854545],"about_ca_topic_score_codex":0.0028090554,"about_ca_topic_score_gemma":0.02330592,"teacher_disagreement_score":0.67186457,"about_ca_system_score_codex":0.00005289047,"about_ca_system_score_gemma":0.000015397829,"threshold_uncertainty_score":0.9945162},"labels":[],"label_agreement":null},{"id":"W4412343513","doi":"","title":"IEA EBC Annex 55 - Reliability of Energy Efficient Building Retrofitting - Probability Assessment of Performance and Cost (RAP-RETRO) - Stochastic Data","year":2015,"lang":"en","type":"report","venue":"VBN Forskningsportal (Aalborg Universitet)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"British Columbia Institute of Technology","funders":"","keywords":"Retrofitting; Reliability (semiconductor); Reliability engineering; Computer science; Environmental science; Engineering; Structural engineering; Physics","score_opus":0.048868206505590935,"score_gpt":0.2771003972469857,"score_spread":0.22823219074139478,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412343513","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96818894,0.00026648052,0.0027429438,0.000055933146,0.0006492805,0.00069431687,0.00026953206,0.00017943147,0.026953155],"genre_scores_gemma":[0.99558294,0.00006436604,0.0016062945,0.000025395282,0.00054632773,0.000006759784,0.0014841136,0.000097609736,0.00058620167],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99339116,0.000055892797,0.0015808287,0.0016034954,0.0026523825,0.0007162547],"domain_scores_gemma":[0.98966974,0.00022278482,0.003874032,0.0021194927,0.004000821,0.000113129754],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00556858,0.0007437049,0.0016530333,0.0011522211,0.00033630765,0.00012777324,0.0014556432,0.0004581107,0.0001124422],"category_scores_gemma":[0.0030810465,0.0007592416,0.0003021701,0.0018133664,0.00056609325,0.0013102491,0.0025019671,0.00068265427,0.000004087983],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020323918,0.00076660403,0.9296251,0.00717778,0.0008744165,0.00006925603,0.00016500945,0.040656123,0.00017722452,0.0022016836,0.013675051,0.0044085225],"study_design_scores_gemma":[0.0032526979,0.00024748323,0.10325616,0.0050705546,0.006451767,0.00003796344,0.0022365437,0.7621654,0.00007468899,0.0004392066,0.11355418,0.0032133453],"about_ca_topic_score_codex":0.009808074,"about_ca_topic_score_gemma":0.00018763272,"teacher_disagreement_score":0.8263689,"about_ca_system_score_codex":0.0009934306,"about_ca_system_score_gemma":0.0013598228,"threshold_uncertainty_score":0.99948585},"labels":[],"label_agreement":null},{"id":"W4412369275","doi":"10.3390/buildings15142381","title":"A Core Ontology for Whole Life Costing in Construction Projects","year":2025,"lang":"en","type":"article","venue":"Buildings","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; GDG Environnement","funders":"Natural Sciences and Engineering Research Council of Canada; Fonds de recherche du Québec","keywords":"Ontology-based data integration; Computer science; Ontology; Upper ontology; Process ontology; Interoperability; Software engineering; Ontology engineering; Scripting language; Suggested Upper Merged Ontology; Semantic Web; Knowledge management; World Wide Web; Programming language","score_opus":0.04939558611674932,"score_gpt":0.28509730888943585,"score_spread":0.23570172277268653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412369275","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96877414,0.00010699754,0.0049112644,0.004414263,0.00044171073,0.00051548117,0.000001571737,0.00021364223,0.020620944],"genre_scores_gemma":[0.99205106,0.0000013152993,0.0034275658,0.0036364975,0.000437135,0.000089780704,0.000019695153,0.000015956712,0.00032101726],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990308,0.000005570592,0.00029155725,0.0003169931,0.000077597215,0.00027744018],"domain_scores_gemma":[0.99932003,0.00014520687,0.00018898593,0.00014892817,0.00018840932,0.00000844472],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037792383,0.0001258664,0.00023969277,0.00057370256,0.00015179256,0.00016104443,0.00017159336,0.00008381925,0.000010985907],"category_scores_gemma":[0.0025335043,0.00013183897,0.00007302744,0.0009594886,0.000052511255,0.00037510452,0.000107214524,0.00011173738,0.000020248212],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000109066445,0.00007369456,0.8272461,0.000716228,0.00007984658,0.0000059155423,0.00008044508,0.00025500785,0.0027111275,0.11829218,0.026980562,0.023449784],"study_design_scores_gemma":[0.0074265525,0.000039037695,0.08346602,0.0014528541,0.000590877,0.000009342628,0.00381332,0.1720793,0.00057594373,0.080224685,0.64902955,0.001292541],"about_ca_topic_score_codex":0.0007867418,"about_ca_topic_score_gemma":0.00023751018,"teacher_disagreement_score":0.74378014,"about_ca_system_score_codex":0.00005930225,"about_ca_system_score_gemma":0.000052083884,"threshold_uncertainty_score":0.5376237},"labels":[],"label_agreement":null},{"id":"W4413974096","doi":"10.35483/acsa.aia.intermaterialeco.23.8","title":"Deep ‘Climate’ Retrofit: Assessing Life-Cycle Thinking Of Emission Calculators In Construction","year":2023,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Natural Sciences and Engineering Research Council of Canada; Hydro-Québec","keywords":"Computer science; Architectural engineering; Construction engineering; Engineering; Environmental science","score_opus":0.017607364958608682,"score_gpt":0.2558463747966327,"score_spread":0.238239009838024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413974096","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98471886,0.000020510417,0.00071623555,0.0004171484,0.00029760198,0.00007746238,2.860096e-7,0.00035735057,0.013394547],"genre_scores_gemma":[0.99839514,0.0000092017535,0.00093892275,0.00025141,0.00031018403,0.0000032228509,0.000025250813,0.000025136165,0.000041502346],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99857026,0.000018457991,0.00045978636,0.00027873865,0.00035916033,0.00031358202],"domain_scores_gemma":[0.99926704,0.00008629499,0.0002951567,0.00022372155,0.000110968314,0.000016794975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00083999377,0.00013716162,0.0002660158,0.0007713865,0.0001844672,0.00022838014,0.00017628574,0.00009270972,0.00016055797],"category_scores_gemma":[0.000773778,0.00012615384,0.00009585646,0.002305012,0.000045863755,0.0010421533,0.00023626818,0.00013816604,0.00011268326],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000781328,0.000021684902,0.9818843,0.00020422068,0.000022772987,0.000009272423,0.000072796895,0.0052315798,0.0013822827,0.003784547,0.0002806319,0.007098121],"study_design_scores_gemma":[0.0005537858,0.0000028512397,0.32637012,0.00032641063,0.00009137702,0.0000013810657,0.0035670588,0.66322595,0.00042788143,0.0048635677,0.00025653926,0.00031308507],"about_ca_topic_score_codex":0.0008240364,"about_ca_topic_score_gemma":0.000064435975,"teacher_disagreement_score":0.65799433,"about_ca_system_score_codex":0.000043038795,"about_ca_system_score_gemma":0.000019180708,"threshold_uncertainty_score":0.5144404},"labels":[],"label_agreement":null},{"id":"W4417064666","doi":"10.1016/b978-0-443-15670-0.00003-x","title":"The impact of carbon taxation on cement and concrete prices","year":2025,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Cement; Carbon fibers; Coal; Carbon tax; Carbon footprint","score_opus":0.013712575484591552,"score_gpt":0.2392216607279933,"score_spread":0.22550908524340174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417064666","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0075839167,0.00061288686,5.597362e-7,0.000104919476,0.00013947612,0.00034668442,0.0000057509938,0.000035487177,0.99117035],"genre_scores_gemma":[0.11928995,0.00012656995,0.000016114855,0.00026618296,0.00073613063,0.000021749176,0.000030962703,0.000044551605,0.8794678],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988579,0.000007745164,0.000382239,0.00028964857,0.00029192324,0.00017051035],"domain_scores_gemma":[0.9981161,0.00015471541,0.0011351785,0.00039151052,0.00019185025,0.000010693118],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038388357,0.00028346205,0.00036929458,0.00025454763,0.0001619917,0.0001768067,0.00021369242,0.00011675457,0.000024955447],"category_scores_gemma":[0.00016054946,0.00018767938,0.00021188504,0.00003523058,0.00009628091,0.000054113847,0.00018050284,0.00019660473,0.000012979041],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004680864,0.0000021956575,0.00058070605,0.00023829522,0.0005796114,0.0000029526698,0.00003916805,0.000015274854,0.000029040431,0.01573751,0.00050209224,0.9822264],"study_design_scores_gemma":[0.00061374356,0.00006917427,0.0017713391,0.0017057166,0.001295001,6.0671084e-7,0.000032708784,0.002705916,0.000031638265,0.01188461,0.97922796,0.0006615749],"about_ca_topic_score_codex":0.00009034103,"about_ca_topic_score_gemma":0.000032854903,"teacher_disagreement_score":0.98156476,"about_ca_system_score_codex":0.00007103828,"about_ca_system_score_gemma":0.000045832756,"threshold_uncertainty_score":0.7653343},"labels":[],"label_agreement":null},{"id":"W566485206","doi":"","title":"Winnipeg Paves the Way in Fleet Management","year":2007,"lang":"en","type":"article","venue":"THE APWA REPORTER","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Fleet management; Procurement; Agency (philosophy); Business; Key (lock); Government (linguistics); Operations management; Transport engineering; Computer science; Computer security; Marketing; Economics; Engineering","score_opus":0.01837294545267597,"score_gpt":0.23708484916837155,"score_spread":0.21871190371569557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W566485206","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7896,0.00008804055,0.00049949414,0.0068520843,0.0004016161,0.0003295709,1.9640711e-7,0.00012670661,0.20210224],"genre_scores_gemma":[0.9898209,0.0000059308877,0.00006837773,0.0048942934,0.0009825022,0.000016589029,0.0000058438686,0.000022937546,0.0041825986],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9985152,0.00001558142,0.0004797917,0.00026511916,0.00036107254,0.00036326103],"domain_scores_gemma":[0.9987543,0.00009018009,0.00029766664,0.0007902488,0.000059331534,0.000008224158],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028427362,0.00015255272,0.0001576596,0.00018801188,0.00020533786,0.00022499407,0.00045826772,0.000035939694,0.00013663014],"category_scores_gemma":[0.000108093554,0.000080606376,0.00010705434,0.0007488552,0.000077657984,0.00028447038,0.00029574858,0.00014396574,0.00030444932],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016877963,0.0003838688,0.69944036,0.00027969005,0.00080505287,0.00218586,0.0012546121,0.0006869343,0.00069382874,0.03777991,0.10683342,0.14948767],"study_design_scores_gemma":[0.00048555978,0.000004367894,0.70030385,0.000075028634,0.00031271434,0.000025450341,0.0019236604,0.0017746213,0.00011641285,0.013492142,0.2811061,0.00038006826],"about_ca_topic_score_codex":0.0006126244,"about_ca_topic_score_gemma":0.00045152602,"teacher_disagreement_score":0.20022088,"about_ca_system_score_codex":0.000033145476,"about_ca_system_score_gemma":0.0000038071948,"threshold_uncertainty_score":0.39131817},"labels":[],"label_agreement":null},{"id":"W581269204","doi":"","title":"A CASE STUDY IN THE APPLICATION OF PROJECT LEVEL LIFE CYCLE ANALYSIS TO ASPHALT PAVEMENT PRESERVATION STRATEGIES: A CANADIAN CASE STUDY","year":2000,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pavement management; Life cycle costing; Transport engineering; Engineering; Activity-based costing; Probabilistic logic; Asphalt; Pavement engineering; Level of service; Life-cycle cost analysis; Operations research; Civil engineering; Computer science; Reliability engineering; Geography","score_opus":0.08352763568415905,"score_gpt":0.3184466323246612,"score_spread":0.23491899664050214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W581269204","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.993727,0.0000047819726,0.0005943331,0.00038959034,0.000011399179,0.0029218453,0.0000068608865,0.000043091968,0.0023010813],"genre_scores_gemma":[0.99820817,3.3561653e-7,0.00008298912,0.0008716614,0.00012347709,0.0005775262,0.000022352644,0.00001572378,0.00009779462],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9980166,0.000110227375,0.000644769,0.00046928634,0.00045349344,0.0003056519],"domain_scores_gemma":[0.99871314,0.00008407635,0.00018687826,0.00073305005,0.00024641247,0.000036468195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016649102,0.00019873116,0.00032843195,0.0012459598,0.0002697313,0.0004063534,0.0003568796,0.000037260346,0.00020138978],"category_scores_gemma":[0.00011239893,0.0001521493,0.00009443914,0.0060637593,0.000014394006,0.0007985256,0.00006308492,0.000107486856,0.000033179047],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030022085,0.0025285871,0.8992413,0.000057431367,0.0011804702,0.004481777,0.01631541,0.063884005,0.000004733788,0.00014823207,0.00038190393,0.011746114],"study_design_scores_gemma":[0.0012769366,0.00013366605,0.16057493,0.000008097109,0.0026948578,0.00007058862,0.6192285,0.21496597,9.131159e-7,0.00005815326,0.0005722149,0.00041516882],"about_ca_topic_score_codex":0.98221785,"about_ca_topic_score_gemma":0.9846049,"teacher_disagreement_score":0.73866636,"about_ca_system_score_codex":0.00009807495,"about_ca_system_score_gemma":0.0001762359,"threshold_uncertainty_score":0.6204468},"labels":[],"label_agreement":null},{"id":"W585543415","doi":"","title":"Achieving Success Through Innovation - Building a Road, Building Benefits","year":2013,"lang":"en","type":"article","venue":"2013 CONFERENCE AND EXHIBITION OF THE TRANSPORTATION ASSOCIATION OF CANADA - TRANSPORTATION: BETTER - FASTER - SAFER","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Mandate; Business; General partnership; Liberian dollar; Government (linguistics); Finance; Marketing; Political science","score_opus":0.01452008699382222,"score_gpt":0.20789236573922298,"score_spread":0.19337227874540075,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W585543415","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9830197,0.000033636454,0.003326738,0.012344205,0.0003119181,0.00042055832,0.00009844874,0.000043627973,0.00040112954],"genre_scores_gemma":[0.99608815,0.000016347512,0.00080188294,0.0022778679,0.00018814494,0.000050704577,0.00034739904,0.00003075353,0.0001987448],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99709713,0.000038352995,0.0012244381,0.00037245153,0.0009363903,0.0003312196],"domain_scores_gemma":[0.9964461,0.00009139046,0.0016631712,0.00024524992,0.0015285948,0.000025503976],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037568435,0.0002876827,0.00043343718,0.00026260706,0.00028691627,0.0001570326,0.00026903415,0.00014816505,0.0005059903],"category_scores_gemma":[0.00006740422,0.00026332538,0.00013137715,0.0010221453,0.00006307879,0.0024668735,0.000008509426,0.00021162324,0.000004340859],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055668625,0.000107569474,0.9304662,0.0006532321,0.00034399176,0.0000016643426,0.0013635565,0.0044855527,0.016615178,0.032936502,0.0063475813,0.0066233417],"study_design_scores_gemma":[0.00083888404,0.000010165055,0.99091035,0.00037520437,0.00027519924,1.9821779e-7,0.00040672853,0.0010372858,0.0025412722,0.0017746614,0.0014887489,0.00034127652],"about_ca_topic_score_codex":0.17627028,"about_ca_topic_score_gemma":0.20810878,"teacher_disagreement_score":0.060444217,"about_ca_system_score_codex":0.00011136058,"about_ca_system_score_gemma":0.0001622429,"threshold_uncertainty_score":0.9999819},"labels":[],"label_agreement":null},{"id":"W613856058","doi":"","title":"PS 3150: Implications for Infrastructure Valuation, Accounting, and Management","year":2007,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Valuation (finance); Amortization; Business; Accounting; Intangible asset; Book value; Pre-money valuation; Valuation effects; Earnings before interest, taxes, depreciation, and amortization; Finance; Asset management; Economics; Debt; Earnings","score_opus":0.02114168558714519,"score_gpt":0.2725533303224155,"score_spread":0.25141164473527033,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W613856058","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44635785,0.00013070296,0.41919857,0.009650435,0.0004293911,0.0015221307,0.0000066617054,0.00068599836,0.122018255],"genre_scores_gemma":[0.98129904,0.000014099891,0.012217621,0.0043675005,0.0009901131,0.000053281903,0.000069957816,0.000028644747,0.00095976505],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99899644,0.0000022125644,0.00028212124,0.00030495276,0.00014395207,0.00027031387],"domain_scores_gemma":[0.9991876,0.000075271375,0.0001746379,0.00026054578,0.00028796867,0.000013984843],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008016254,0.0001364174,0.00012734129,0.000334455,0.00032304123,0.00031571678,0.00018154895,0.000051446757,0.000076693934],"category_scores_gemma":[0.00013515996,0.00012456447,0.000059469316,0.0005377356,0.00003152599,0.00055958156,0.00014735348,0.0000507724,0.000042949967],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017242335,0.000038319802,0.51423687,0.0002626426,0.00014272078,6.2994417e-7,0.00003342816,0.00015687085,0.00023995427,0.31467587,0.04893792,0.12125754],"study_design_scores_gemma":[0.0004504887,0.0000024709177,0.83329314,0.000013958111,0.0002296672,9.641938e-7,0.00018974974,0.0029504867,0.000018285482,0.04767875,0.11496916,0.00020288906],"about_ca_topic_score_codex":0.00007408479,"about_ca_topic_score_gemma":0.00009780004,"teacher_disagreement_score":0.53494114,"about_ca_system_score_codex":0.000029378572,"about_ca_system_score_gemma":0.000005732939,"threshold_uncertainty_score":0.5079592},"labels":[],"label_agreement":null},{"id":"W62226041","doi":"10.5006/c2003-03006","title":"Surface-Tolerant, Aluminum-Foil, Tape Coating","year":2003,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Royal Military College of Canada","funders":"","keywords":"Materials science; Aluminum foil; Coating; FOIL method; Aluminium; Composite material; Metallurgy; Layer (electronics)","score_opus":0.025153150002733535,"score_gpt":0.22882431363786762,"score_spread":0.2036711636351341,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W62226041","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6427998,0.000052706582,0.00090933574,0.00040271122,0.00027022365,0.00009226782,4.3503016e-7,0.0003344467,0.3551381],"genre_scores_gemma":[0.99015325,0.0000026687728,0.0016874275,0.002758658,0.0004464294,0.0000038642506,0.000011313386,0.000037514972,0.0048988773],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99866116,0.000019683868,0.00032506944,0.0003479345,0.00025418465,0.00039195607],"domain_scores_gemma":[0.9991868,0.00008949577,0.00018306119,0.00033820322,0.00018457678,0.000017861423],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0006115352,0.0001979412,0.00024421167,0.00014042568,0.0002738407,0.00040085067,0.00021941638,0.000062701154,0.0018967317],"category_scores_gemma":[0.0006057121,0.00018012745,0.0001220999,0.00081148196,0.000038622635,0.0007431251,0.00008471656,0.00012787474,0.0020784105],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018132789,0.0002248081,0.7954089,0.00028300507,0.00026871433,0.000048169786,0.0001340893,0.009422712,0.007685945,0.090107195,0.09016176,0.0062365835],"study_design_scores_gemma":[0.0024515772,0.000020488611,0.01273875,0.00017603557,0.0006008311,0.000013427322,0.0025263734,0.199241,0.0029329245,0.005842354,0.77126974,0.002186478],"about_ca_topic_score_codex":0.0010639081,"about_ca_topic_score_gemma":0.00012878432,"teacher_disagreement_score":0.78267014,"about_ca_system_score_codex":0.000035515266,"about_ca_system_score_gemma":0.000023884806,"threshold_uncertainty_score":0.9990157},"labels":[],"label_agreement":null},{"id":"W631045022","doi":"","title":"A Survey of Current State of the Practice for Winter Maintenance of Parking Lots and Sidewalks","year":2013,"lang":"en","type":"article","venue":"Transportation Research Board 92nd Annual MeetingTransportation Research Board","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Sustainability; Transport engineering; Field survey; Engineering; Field (mathematics); Business; Computer science; Civil engineering; Mathematics","score_opus":0.08138362605460377,"score_gpt":0.3749699449100334,"score_spread":0.29358631885542963,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W631045022","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9944104,0.0003307744,0.00082177686,0.001603199,0.0001252665,0.0019920156,0.00033659546,0.000033909764,0.00034605333],"genre_scores_gemma":[0.99839556,0.00016365708,0.00068516505,0.00005472056,0.0000901287,0.0002562931,0.0001390895,0.000057458714,0.00015793303],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9937802,0.00054378645,0.0015607356,0.00064442185,0.0026232891,0.0008475997],"domain_scores_gemma":[0.9792053,0.003322688,0.0009689983,0.0005174031,0.01590611,0.0000795086],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0097489115,0.00026351504,0.00059781375,0.0009542252,0.0003494517,0.00013710436,0.000691679,0.000092523755,0.0000536844],"category_scores_gemma":[0.0055683735,0.00021383382,0.00022883982,0.002698028,0.0010466883,0.0014832175,0.000044710898,0.0007178463,0.000009602095],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018785148,0.0008496479,0.92689735,0.005842307,0.0003763028,0.0000063844845,0.0050754496,0.0015856425,0.0104586985,0.0026454648,0.008544979,0.035839234],"study_design_scores_gemma":[0.0011016725,0.00012347686,0.9858565,0.0008229582,0.000089537025,7.936858e-8,0.0028317363,0.0015394317,0.0020228128,0.0018431563,0.0035471173,0.00022157226],"about_ca_topic_score_codex":0.04533184,"about_ca_topic_score_gemma":0.02014441,"teacher_disagreement_score":0.058959074,"about_ca_system_score_codex":0.000047999587,"about_ca_system_score_gemma":0.00025704032,"threshold_uncertainty_score":0.9977354},"labels":[],"label_agreement":null},{"id":"W636800691","doi":"","title":"PAVEMENT TECHNOLOGY FOR MEGA TRANSPORTATION PROJECTS","year":2001,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transport engineering; Life cycle costing; Toll; Engineering; Activity-based costing; Flexibility (engineering); Track (disk drive); Civil engineering; Business","score_opus":0.027721707693306966,"score_gpt":0.24169336574472539,"score_spread":0.21397165805141843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W636800691","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9376962,0.00003891333,0.03237286,0.009396981,0.00020703972,0.00069721683,0.0000017941609,0.00079766597,0.01879132],"genre_scores_gemma":[0.99507123,0.0000033795043,0.0016653204,0.0012708855,0.00036814742,0.00010904012,0.000055006603,0.000015615939,0.0014413627],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99932694,0.0000010853996,0.00017532913,0.0001992147,0.00010805802,0.00018935362],"domain_scores_gemma":[0.9996002,0.000015388203,0.00009000557,0.0001419738,0.00014827146,0.000004166037],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014429385,0.000088081295,0.00011094169,0.0003394782,0.00010295602,0.00006826494,0.0001192687,0.00004950361,0.00015098217],"category_scores_gemma":[0.00006502675,0.00007677755,0.000061035033,0.00071167183,0.00001617555,0.00031445356,0.000009929134,0.000035316985,0.000067665795],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008280161,0.0003759759,0.67305374,0.00038855977,0.00025825383,0.00002494671,0.000101196485,0.00036766747,0.005045417,0.21072704,0.029769469,0.07980491],"study_design_scores_gemma":[0.00293123,0.000052939897,0.028844325,0.00008542299,0.0006737579,0.0000018497051,0.0023464286,0.03634465,0.0032432592,0.032195527,0.8923661,0.0009144674],"about_ca_topic_score_codex":0.00024292165,"about_ca_topic_score_gemma":0.00045404193,"teacher_disagreement_score":0.8625967,"about_ca_system_score_codex":0.000015777578,"about_ca_system_score_gemma":0.000007240168,"threshold_uncertainty_score":0.31308976},"labels":[],"label_agreement":null},{"id":"W6893006199","doi":"10.5281/zenodo.14234579","title":"REHOUSE public report: Social Life Cycle Assessment Plan (S-LCA) for the 4 local contexts","year":2024,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Anesthesia Research Foundation","funders":"European Commission","keywords":"Deliverable; Scope (computer science); Stakeholder; Action plan; Process (computing); Plan (archaeology); Task (project management); Action (physics); Work (physics)","score_opus":0.0575117227689027,"score_gpt":0.27514783667739645,"score_spread":0.21763611390849374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6893006199","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06532013,0.001128398,0.3756811,0.13735478,0.0028031403,0.0041675796,0.0004828561,0.013809351,0.39925268],"genre_scores_gemma":[0.9936056,0.000012716451,0.000073329735,0.001005235,0.002029655,4.2369987e-7,0.0011256012,0.0010714042,0.0010760365],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981194,0.00008100825,0.00037142634,0.00049439433,0.0005088306,0.00042495388],"domain_scores_gemma":[0.9985823,0.0001114439,0.00017296341,0.00041766991,0.0006656669,0.00004997924],"candidate_categories":["sts","scholarly_communication","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0017905139,0.00016811253,0.00017866993,0.00031438484,0.0034638182,0.0049600243,0.00091409223,0.000065766064,0.0035047652],"category_scores_gemma":[0.0017405493,0.00014076526,0.00014480435,0.0009619474,0.00018319259,0.00077260536,0.0010134616,0.00029883202,0.0033368107],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041883235,0.00010844167,0.00003394752,0.00025730845,0.00029950438,0.00007549822,0.00031875868,0.00028994455,0.00013921488,0.04409122,0.7540099,0.2003344],"study_design_scores_gemma":[0.0002974302,0.00001915722,0.0009814866,0.000027015942,0.00009662837,0.000028303597,0.00054191984,0.0429854,0.0000042376537,0.0006768666,0.9541671,0.00017444965],"about_ca_topic_score_codex":0.000083732106,"about_ca_topic_score_gemma":0.0000036078732,"teacher_disagreement_score":0.9282855,"about_ca_system_score_codex":0.00015106297,"about_ca_system_score_gemma":0.000013931455,"threshold_uncertainty_score":0.99783355},"labels":[],"label_agreement":null},{"id":"W6910225880","doi":"10.4224/23004345","title":"Durability and climate change: changing climatic loads as may affect the durability of building materials, components and assemblies, proceedings of CIB/NRC symposium","year":2018,"lang":"en","type":"article","venue":"NPARC","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Research Council Canada; Government of Canada","keywords":"Durability; Affect (linguistics); Climate change; Cold climate","score_opus":0.02508546967514191,"score_gpt":0.25667443203965834,"score_spread":0.23158896236451643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6910225880","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.995091,0.000033356086,0.000006501196,0.0016047845,0.00018350272,0.00052606285,0.000009929724,0.00007188399,0.0024729515],"genre_scores_gemma":[0.9989722,0.00003954545,0.00025948242,0.00018324815,0.0004708881,0.000035300938,0.0000057931493,0.00002741971,0.0000061616265],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99816704,0.000034963847,0.00052677,0.0004257666,0.00042252496,0.00042293684],"domain_scores_gemma":[0.99840486,0.00018060533,0.0006227053,0.0002751568,0.0004925261,0.000024144105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031915277,0.00023892954,0.0005124271,0.0002816619,0.0003309707,0.00024763434,0.00026262997,0.000080450336,0.00006923684],"category_scores_gemma":[0.00071356876,0.0001803449,0.00006879194,0.0006324046,0.00041000792,0.00073603255,0.00065479765,0.0000990505,0.00000724169],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000082124134,0.00007532422,0.3327753,0.0028545503,0.00006029433,6.1137285e-7,0.0005136395,2.7758813e-7,0.65860665,0.0041796314,0.000059061284,0.0007925679],"study_design_scores_gemma":[0.0016518112,0.00014138056,0.81514436,0.00178745,0.0010833595,0.000016219397,0.0018322616,0.011796565,0.15530594,0.010007383,0.0003822963,0.0008510053],"about_ca_topic_score_codex":0.00032125766,"about_ca_topic_score_gemma":0.000015361406,"teacher_disagreement_score":0.5033007,"about_ca_system_score_codex":0.00004099606,"about_ca_system_score_gemma":0.000007738014,"threshold_uncertainty_score":0.7354252},"labels":[],"label_agreement":null},{"id":"W6925329430","doi":"10.17895/ices.pub.24974322","title":"Determining sources of capelin recruits in the Saguenay-St. Lawrence Marine Park (Canada) using otolith chemistry","year":2012,"lang":"en","type":"other","venue":"Open MIND","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Capelin; Otolith; Estuary; Fjord; Bay; Juvenile; Spawn (biology); Foraging","score_opus":0.05812685035304216,"score_gpt":0.27332054562277847,"score_spread":0.2151936952697363,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6925329430","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2713745,0.00013877514,0.0000055442774,0.00008695543,0.00012456585,0.00036543614,0.000015314426,0.000004901752,0.72788405],"genre_scores_gemma":[0.81991464,0.000022785836,0.0027522603,0.00054518017,0.003516575,0.000048161695,0.0002596206,0.00045915408,0.17248161],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984129,0.000029874755,0.00041262657,0.0003775813,0.00041007675,0.00035695985],"domain_scores_gemma":[0.99845165,0.00008591284,0.000855611,0.0005332258,0.000056861663,0.000016733815],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0006790725,0.0002871548,0.00048444103,0.0001347099,0.00007779,0.00028971836,0.0012459795,0.00015115338,0.007100124],"category_scores_gemma":[0.00022376412,0.00022819344,0.000063746316,0.00049763336,0.000063942505,0.00022619357,0.0006674137,0.00023876934,0.00004418532],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052058378,0.00023461184,0.67117894,0.0015406179,0.0004787999,0.00019429941,0.00047347133,0.00038833712,0.0007450324,0.000014830971,0.088736385,0.23596261],"study_design_scores_gemma":[0.00051258126,0.0000023696953,0.004389345,0.0015473041,0.000496074,0.000008763591,0.0010909814,0.0028134892,0.00035505628,0.000016901546,0.9880281,0.0007390053],"about_ca_topic_score_codex":0.41618797,"about_ca_topic_score_gemma":0.3555184,"teacher_disagreement_score":0.89929175,"about_ca_system_score_codex":0.0000599027,"about_ca_system_score_gemma":0.00017409674,"threshold_uncertainty_score":0.9938075},"labels":[],"label_agreement":null},{"id":"W6931830059","doi":"10.5683/sp3/cv6wox","title":"Data recorded during a series of rock mechanics experiments for five Duvernay shale samples","year":2023,"lang":"en","type":"dataset","venue":"Borealis","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Oil shale; Series (stratigraphy); Rock mechanics; Anisotropy; Time series; Well logging","score_opus":0.08696100093902502,"score_gpt":0.29588174442097875,"score_spread":0.20892074348195372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6931830059","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0001856823,0.000076670796,0.00012976225,0.00014283035,0.0003946771,0.00042081016,0.99845576,0.00015290284,0.000040911797],"genre_scores_gemma":[0.00007011659,0.0001840472,0.00025551702,0.00013307582,0.0015605234,0.000120435165,0.9972376,0.00008614589,0.000352524],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99776065,0.000015979522,0.0006314475,0.00075151114,0.00044627182,0.00039415905],"domain_scores_gemma":[0.9966713,0.000144773,0.0009579438,0.0019146401,0.00029059008,0.000020732306],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00040167064,0.00038252363,0.00068500027,0.00043944074,0.00023141345,0.00024664967,0.001719528,0.00021131647,0.0000521946],"category_scores_gemma":[0.001941454,0.00038861277,0.0001862007,0.00048571156,0.000016154656,0.00082537334,0.0018233439,0.0001520542,0.00008530901],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007939787,0.000048359558,0.000036950376,0.0011970699,0.00034524655,0.000011535136,0.000013796296,0.00008030327,0.000025290352,0.000047667017,0.9980457,0.00006871252],"study_design_scores_gemma":[0.000483216,0.000010971038,0.00013208154,0.00033546909,0.0007073397,0.0000011019987,0.0003795135,0.0024637955,0.000054170338,0.00048503708,0.9945063,0.0004409751],"about_ca_topic_score_codex":0.1344323,"about_ca_topic_score_gemma":0.0339687,"teacher_disagreement_score":0.1004636,"about_ca_system_score_codex":0.000053159838,"about_ca_system_score_gemma":0.00004848745,"threshold_uncertainty_score":0.9998566},"labels":[],"label_agreement":null},{"id":"W6967883002","doi":"10.5281/zenodo.14234580","title":"REHOUSE public report: Social Life Cycle Assessment Plan (S-LCA) for the 4 local contexts","year":2024,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Anesthesia Research Foundation","funders":"European Commission","keywords":"Deliverable; Scope (computer science); Stakeholder; Action plan; Process (computing); Plan (archaeology); Task (project management); Action (physics); Work (physics)","score_opus":0.0575117227689027,"score_gpt":0.27514783667739645,"score_spread":0.21763611390849374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6967883002","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06532013,0.001128398,0.3756811,0.13735478,0.0028031403,0.0041675796,0.0004828561,0.013809351,0.39925268],"genre_scores_gemma":[0.9936056,0.000012716451,0.000073329735,0.001005235,0.002029655,4.2369987e-7,0.0011256012,0.0010714042,0.0010760365],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981194,0.00008100825,0.00037142634,0.00049439433,0.0005088306,0.00042495388],"domain_scores_gemma":[0.9985823,0.0001114439,0.00017296341,0.00041766991,0.0006656669,0.00004997924],"candidate_categories":["sts","scholarly_communication","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0017905139,0.00016811253,0.00017866993,0.00031438484,0.0034638182,0.0049600243,0.00091409223,0.000065766064,0.0035047652],"category_scores_gemma":[0.0017405493,0.00014076526,0.00014480435,0.0009619474,0.00018319259,0.00077260536,0.0010134616,0.00029883202,0.0033368107],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041883235,0.00010844167,0.00003394752,0.00025730845,0.00029950438,0.00007549822,0.00031875868,0.00028994455,0.00013921488,0.04409122,0.7540099,0.2003344],"study_design_scores_gemma":[0.0002974302,0.00001915722,0.0009814866,0.000027015942,0.00009662837,0.000028303597,0.00054191984,0.0429854,0.0000042376537,0.0006768666,0.9541671,0.00017444965],"about_ca_topic_score_codex":0.000083732106,"about_ca_topic_score_gemma":0.0000036078732,"teacher_disagreement_score":0.9282855,"about_ca_system_score_codex":0.00015106297,"about_ca_system_score_gemma":0.000013931455,"threshold_uncertainty_score":0.99783355},"labels":[],"label_agreement":null},{"id":"W6980945905","doi":"","title":"Declaracions des de la Universitat de Birzeit (Palestina) i els treballadors i estudiants de les universitats de l'Estat espanyol","year":2023,"lang":"ca","type":"article","venue":"Revistes Científiques de la University of Barcelona (University of Barcelona)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Universidad de León; Universidad de Deusto; Universitat Politècnica de Catalunya; Universidad de Salamanca; Universitat Oberta de Catalunya; Universitat Autònoma de Barcelona; Universitat de Lleida; Universidad de Almería; Universidad de Cádiz; Consejo Superior de Investigaciones Científicas; Universidad de Córdoba; Universidad Pública de Navarra; Universitat Politècnica de València; Universidad de Valladolid; Universitat Rovira i Virgili; Universidade da Coruña; Universidad de Castilla-La Mancha; Universidad de Jaén; Universidad de La Rioja; Universidade de Vigo; Universidad de Granada; Universitat de les Illes Balears; Universidad de Las Palmas de Gran Canaria; Universidad de Buenos Aires; Universidad de Alcalá; Universitat de Barcelona; University of Victoria; Universidad Autónoma de Madrid; Universidad Politécnica de Madrid; Universidade de Coimbra; Universitat de València; Euskal Herriko Unibertsitatea; Universidad de Zaragoza; Universitat de Girona; Universidad Complutense de Madrid; Universitat Jaume I; Universidad Nacional de Colombia; Universidad de Málaga; Universitat Pompeu Fabra; Universidad Europea de Madrid; Universidad Nacional de Educación a Distancia; Universidad de Burgos; Universidad de La Laguna; Universidad Carlos III de Madrid; Universidad de Sevilla; Universidad de Alicante; Universidad Iberoamericana Ciudad de México","keywords":"Nucleofection; Gestational period; TSG101; Dysgeusia; Diafiltration; Liquation; Emperipolesis; Triacetin; Fusible alloy","score_opus":0.01592508615254776,"score_gpt":0.23120481355201808,"score_spread":0.21527972739947032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6980945905","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9666852,0.0010910318,0.010547511,0.0016937555,0.00005150649,0.00047503447,0.00017013011,0.00053468713,0.01875116],"genre_scores_gemma":[0.97187334,0.008518033,0.012987615,0.00011840572,0.00010504027,2.326547e-7,0.00012184756,0.000100294936,0.0061752102],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9940207,0.0017108634,0.000419539,0.0011430527,0.0008503286,0.0018555188],"domain_scores_gemma":[0.9943155,0.0023756942,0.0011032098,0.00078210345,0.000906603,0.00051686505],"candidate_categories":["metaepi_narrow","sts"],"consensus_categories":["sts"],"category_scores_codex":[0.003856824,0.00078892545,0.0012603054,0.0025036603,0.0023403862,0.00027758372,0.0023472377,0.0008094075,0.000677621],"category_scores_gemma":[0.0009239745,0.0012064165,0.0010971697,0.0040949252,0.0034359412,0.0019591704,0.0018135649,0.0009503036,0.00014710757],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011746621,0.0011886881,0.8720694,0.006227613,0.002319242,0.0071596503,0.034566138,0.011949009,0.0088878805,0.013520368,0.019287542,0.021649804],"study_design_scores_gemma":[0.0048117335,0.00024142856,0.71095484,0.0039019769,0.005528371,0.00016453266,0.15662369,0.047163665,0.00022258576,0.0024779902,0.06587339,0.0020358015],"about_ca_topic_score_codex":0.009401039,"about_ca_topic_score_gemma":0.0013198539,"teacher_disagreement_score":0.16111457,"about_ca_system_score_codex":0.0027253134,"about_ca_system_score_gemma":0.0013650255,"threshold_uncertainty_score":0.99927616},"labels":[],"label_agreement":null},{"id":"W6990549940","doi":"","title":"Douglas Dynamics, Inc. A Financial Analysis and Valuation Report","year":2021,"lang":"en","type":"article","venue":"RED - a Repository of Digital Collections (Minnesota State University Moorhead)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Valuation (finance); Earnings; Profit (economics); Purchasing; Financial analysis; Stock (firearms); Truck; Financial ratio","score_opus":0.009148825529384825,"score_gpt":0.18790818490038766,"score_spread":0.17875935937100285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6990549940","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94588953,0.000040977397,0.005839317,0.0005380542,0.0003422494,0.0001737317,0.000060865957,0.00015466745,0.046960585],"genre_scores_gemma":[0.96772105,0.0000150944925,0.00030972608,0.000018244014,0.0001481071,0.0000014378631,0.00035320796,0.000015675665,0.031417448],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99844533,0.000036478956,0.00042766702,0.00051045214,0.0003597345,0.00022034324],"domain_scores_gemma":[0.9979119,0.000094810726,0.0004921768,0.00040275542,0.0010609211,0.000037445032],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018962695,0.0001899875,0.000408825,0.0013379249,0.0009038501,0.00045521354,0.00014491049,0.0000898398,0.000019398081],"category_scores_gemma":[0.00051596476,0.00023781553,0.00025537863,0.0061421064,0.0001393843,0.0015554533,0.00025088526,0.00014028083,0.0000052254295],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010257306,0.0022567753,0.93683106,0.0006572746,0.0072362362,0.005228824,0.0009535781,0.009975996,0.002096811,0.005495801,0.0195632,0.008678717],"study_design_scores_gemma":[0.00650591,0.0002709701,0.40553236,0.00034038376,0.020389294,0.00094672584,0.008009993,0.3927739,0.0018236628,0.008773563,0.15134668,0.0032865594],"about_ca_topic_score_codex":0.0014579727,"about_ca_topic_score_gemma":0.0022592754,"teacher_disagreement_score":0.5312987,"about_ca_system_score_codex":0.00027312592,"about_ca_system_score_gemma":0.00021134065,"threshold_uncertainty_score":0.9697836},"labels":[],"label_agreement":null},{"id":"W6991853729","doi":"","title":"An Integrated Asset Management Approach for Municipal Infrastructure Systems","year":2007,"lang":"en","type":"article","venue":"NPARC","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Asset management; Asset (computer security); Work (physics); Risk management; Government (linguistics); Key (lock)","score_opus":0.018153456470197997,"score_gpt":0.25170906446579394,"score_spread":0.23355560799559594,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6991853729","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43131152,0.000042777447,0.32131612,0.00015510354,0.00085948006,0.0013318567,0.000021729998,0.0007497525,0.24421166],"genre_scores_gemma":[0.97552854,0.000001537008,0.021768538,0.00046102886,0.0011672955,0.000053685315,0.0004637634,0.00004374435,0.00051186257],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985248,0.000013017188,0.0003464851,0.0003857439,0.00029481246,0.00043517392],"domain_scores_gemma":[0.999046,0.000038804432,0.00020024047,0.00048382406,0.00020302659,0.000028063116],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010468999,0.00021209367,0.00025153946,0.00040066938,0.00020362888,0.00043629395,0.00048594788,0.000101620484,0.00007048631],"category_scores_gemma":[0.00007637499,0.00018441943,0.000097428,0.0007194388,0.000036231373,0.00053727935,0.0001068271,0.00014892478,0.000029861612],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000950242,0.0014676413,0.15364087,0.005454866,0.00232565,0.00013300579,0.00073424634,0.07393887,0.010716285,0.31987336,0.20976305,0.22100191],"study_design_scores_gemma":[0.0012918486,0.000025056765,0.014263193,0.00007530691,0.0004970362,0.0000041451813,0.005587261,0.7758729,0.000053474047,0.002948655,0.19872159,0.0006595666],"about_ca_topic_score_codex":0.00022292226,"about_ca_topic_score_gemma":0.000027465392,"teacher_disagreement_score":0.701934,"about_ca_system_score_codex":0.00006749033,"about_ca_system_score_gemma":0.0000068027825,"threshold_uncertainty_score":0.7520406},"labels":[],"label_agreement":null},{"id":"W6992519673","doi":"","title":"Life cycle cost analysis as a decision support tool for managing municipal infrastructure","year":2004,"lang":"en","type":"article","venue":"NPARC","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Research Council Canada; Natural Sciences and Engineering Research Council of Canada","keywords":"Life-cycle cost analysis; Decision support system; Cost analysis; Decision analysis; Life cycle costing; Cost–benefit analysis","score_opus":0.01273015209569444,"score_gpt":0.25947789935225046,"score_spread":0.24674774725655602,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6992519673","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9302712,0.000017778815,0.039415814,0.0027587186,0.00027444307,0.00049032044,0.000013242873,0.0002882316,0.026470246],"genre_scores_gemma":[0.9841489,0.000007335179,0.009083549,0.005457653,0.0008452371,0.000060704733,0.0001519998,0.000045186083,0.00019942451],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99806255,0.000008347309,0.00046664392,0.00050922215,0.0004629424,0.0004903015],"domain_scores_gemma":[0.99870604,0.00012504224,0.00027791818,0.00059722,0.00023664301,0.00005710772],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00052061095,0.0002580702,0.00044584047,0.00084004086,0.0003645153,0.00049435504,0.00050523086,0.000107439424,0.0013546483],"category_scores_gemma":[0.0016127732,0.0002459745,0.0004350499,0.0020264164,0.00004881786,0.0007776078,0.00027976933,0.00016678894,0.00036125566],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00068127364,0.00038571554,0.14405666,0.0004163499,0.004356333,0.00012688753,0.000774418,0.52354795,0.0016334747,0.051866516,0.035656553,0.2364979],"study_design_scores_gemma":[0.0062078927,0.00005919913,0.06676418,0.00017347716,0.008715973,0.000007819891,0.0012824294,0.37834495,0.00016813667,0.4220039,0.11446601,0.0018060383],"about_ca_topic_score_codex":0.00043719192,"about_ca_topic_score_gemma":0.0002064536,"teacher_disagreement_score":0.3701374,"about_ca_system_score_codex":0.00010099474,"about_ca_system_score_gemma":0.00006984923,"threshold_uncertainty_score":0.9999992},"labels":[],"label_agreement":null},{"id":"W7001303640","doi":"","title":"Je suis altermondialiste, moi non plus : comprendre la diversité des oppositions au néolibéralisme","year":2018,"lang":"fr","type":"other","venue":"Corpus Université Laval (Université Laval)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Subject (documents); Context (archaeology); Politics; Indigenous","score_opus":0.012430926182686835,"score_gpt":0.19296335130472575,"score_spread":0.1805324251220389,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7001303640","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13792737,0.0014788709,0.0010838268,0.0029601129,0.0022790674,0.001026937,0.00047805437,0.0009268737,0.8518389],"genre_scores_gemma":[0.25057375,0.0018505502,0.0006586812,0.00049008074,0.0033501117,0.0000051806924,0.0013874061,0.0006351437,0.7410491],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.993735,0.0003257262,0.00070349296,0.0021059324,0.0012119415,0.0019178678],"domain_scores_gemma":[0.994487,0.00045988,0.0015664921,0.001664247,0.0013456536,0.00047673314],"candidate_categories":["metaepi_narrow","sts","research_integrity","insufficient_payload"],"consensus_categories":["metaepi_narrow","insufficient_payload"],"category_scores_codex":[0.00047516212,0.0017751722,0.0018506761,0.003021966,0.0034700104,0.0008932129,0.0031313475,0.0013268421,0.0053209327],"category_scores_gemma":[0.00016816487,0.0022503599,0.0014501425,0.0033963255,0.0017203096,0.0025718624,0.0035161916,0.0010090916,0.0035587656],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022496814,0.0018997076,0.4921454,0.005471621,0.01059485,0.015665965,0.030880952,0.002426897,0.005106067,0.1256979,0.25112104,0.056739923],"study_design_scores_gemma":[0.006421699,0.00022747794,0.06362974,0.002834625,0.009945687,0.00015637268,0.005055539,0.0062361117,0.00031174568,0.00094017544,0.90060467,0.003636155],"about_ca_topic_score_codex":0.112536445,"about_ca_topic_score_gemma":0.08277033,"teacher_disagreement_score":0.6494836,"about_ca_system_score_codex":0.0042553297,"about_ca_system_score_gemma":0.00077016663,"threshold_uncertainty_score":0.99996966},"labels":[],"label_agreement":null},{"id":"W7019867582","doi":"","title":"Integrated Asset Management of Transportation Infrastructure","year":2009,"lang":"en","type":"article","venue":"NPARC","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Asset management; Asset (computer security); Transportation infrastructure; Risk management; Work (physics)","score_opus":0.009460221630015274,"score_gpt":0.21818422526475761,"score_spread":0.20872400363474233,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7019867582","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9082571,0.000010150821,0.0019430447,0.0008247175,0.00010095246,0.00011953453,0.0000066401603,0.00013140847,0.0886064],"genre_scores_gemma":[0.99568766,0.000005236252,0.0033355784,0.0005321113,0.00012042489,0.0000024380768,0.00015372582,0.000008000556,0.0001548058],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.999282,0.0000038675885,0.00022515294,0.0001548708,0.00020459954,0.00012947814],"domain_scores_gemma":[0.99955165,0.0000066987877,0.00015260259,0.00016731869,0.00011498198,0.0000067291785],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011301884,0.00010158944,0.00014352493,0.00016195273,0.00004245016,0.000050166556,0.00015990334,0.000038874237,0.00042443126],"category_scores_gemma":[0.000012915041,0.00009042811,0.0000675443,0.00063379103,0.000016266004,0.00031158607,0.000007861726,0.00007408726,0.000035295583],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016397689,0.0003243761,0.10956877,0.0007408193,0.00047977557,0.00008584156,0.00020124235,0.0028065986,0.030121466,0.17412283,0.085635334,0.59574896],"study_design_scores_gemma":[0.0008711992,0.000018189594,0.8896523,0.00020448891,0.00048408032,5.2099085e-7,0.0005426103,0.009532997,0.0007889779,0.059511207,0.038036518,0.0003568702],"about_ca_topic_score_codex":0.000030057541,"about_ca_topic_score_gemma":0.000009388844,"teacher_disagreement_score":0.7800836,"about_ca_system_score_codex":0.0000150737915,"about_ca_system_score_gemma":0.0000046054233,"threshold_uncertainty_score":0.46472245},"labels":[],"label_agreement":null},{"id":"W7037890682","doi":"","title":"Formulação e recomendações de uso de um modelo para determinação dos custos administrativos de um projeto de financiamento para Bancos de Desenvolvimento","year":2012,"lang":"pt","type":"article","venue":"Americanae (AECID Library)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Office of Energy Research and Development","keywords":"Government (linguistics); Product (mathematics); Work (physics)","score_opus":0.04037803486386748,"score_gpt":0.28340015170548327,"score_spread":0.2430221168416158,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7037890682","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96920717,0.0019115962,0.018856693,0.0042874203,0.00032544587,0.0012628946,0.000071065646,0.00066884636,0.003408851],"genre_scores_gemma":[0.95555484,0.00051513774,0.02562915,0.008677835,0.0020527015,0.0006683775,0.00015331422,0.00035659186,0.0063920305],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99159205,0.0004584891,0.0014473114,0.0012782501,0.00078989944,0.0044339783],"domain_scores_gemma":[0.9956229,0.0004904272,0.0015585176,0.0014138678,0.00014948758,0.00076479925],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["metaepi_narrow"],"category_scores_codex":[0.0014316818,0.0013469376,0.0014276028,0.00094474957,0.00086420117,0.0008897934,0.0017021835,0.0005045566,0.0013054379],"category_scores_gemma":[0.000715472,0.0014701581,0.00075218873,0.0024707387,0.0003431208,0.0064985384,0.00084133475,0.00092998,0.0004574025],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030220786,0.00095840154,0.9245899,0.00062007614,0.0006012206,0.00030061178,0.0021912793,0.0006537488,0.0011994524,0.00036531556,0.04091462,0.027303208],"study_design_scores_gemma":[0.0045054634,0.0007413207,0.46650004,0.0018888447,0.003892405,0.0002802953,0.011252813,0.38430297,0.011366635,0.0031729003,0.10542438,0.0066719134],"about_ca_topic_score_codex":0.024836412,"about_ca_topic_score_gemma":0.00034746286,"teacher_disagreement_score":0.45808983,"about_ca_system_score_codex":0.001390619,"about_ca_system_score_gemma":0.0017332161,"threshold_uncertainty_score":0.9999282},"labels":[],"label_agreement":null},{"id":"W7039383509","doi":"","title":"Maria Lucas Rhimbassen","year":2018,"lang":"en","type":"article","venue":"Scholarly Commons (Embry–Riddle Aeronautical University)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Legislation; Space (punctuation); Competition (biology)","score_opus":0.026769409852865307,"score_gpt":0.2072700991371101,"score_spread":0.1805006892842448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7039383509","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5718361,0.000051334013,0.0018764749,0.005490822,0.0007082669,0.0002618661,0.000011575148,0.0007149085,0.4190486],"genre_scores_gemma":[0.9863033,0.000004669416,0.000979784,0.0019705032,0.0014876202,0.0000012133722,0.000048461214,0.00005620078,0.009148215],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99741197,0.00009631156,0.00034682718,0.0007461242,0.0006035964,0.00079520163],"domain_scores_gemma":[0.99770594,0.00022393177,0.00022607182,0.000980871,0.0007366651,0.00012653953],"candidate_categories":["metaepi_narrow","scholarly_communication","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0006800089,0.0003842461,0.00044307474,0.0009903124,0.0011188411,0.0014372277,0.0013467463,0.00025324358,0.00097549957],"category_scores_gemma":[0.00093677937,0.00041885048,0.00027861053,0.0028073022,0.0005139841,0.005406451,0.0012841135,0.0007871933,0.005336508],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050627737,0.0008819979,0.22009552,0.00013230185,0.0006876903,0.0006741609,0.000110543486,0.000033165546,0.0016185569,0.71732795,0.043140553,0.0147913],"study_design_scores_gemma":[0.001912363,0.00008505889,0.08069202,0.00010296325,0.0007946021,0.000012283516,0.0005596417,0.004871867,0.00013538307,0.004586923,0.90522534,0.0010215283],"about_ca_topic_score_codex":0.0009840074,"about_ca_topic_score_gemma":0.00090238504,"teacher_disagreement_score":0.8620848,"about_ca_system_score_codex":0.00022864382,"about_ca_system_score_gemma":0.00010104853,"threshold_uncertainty_score":0.9999378},"labels":[],"label_agreement":null},{"id":"W7045027396","doi":"","title":"Alternative Interventions to Assist Farmer-Managed Irrigation Systems in Nepal","year":2009,"lang":"en","type":"article","venue":"Digital Library Of The Commons Repository (Indiana University)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"International Development Research Centre","funders":"","keywords":"Agency (philosophy); Intervention (counseling); Commission; Irrigation; Psychological intervention; Documentation; Process (computing); Agriculture","score_opus":0.014346978899593518,"score_gpt":0.1915701005730206,"score_spread":0.17722312167342708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7045027396","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7951708,0.000040411913,0.00019792815,0.0013295601,0.00033946184,0.00029129293,0.000026862359,0.00011773616,0.202486],"genre_scores_gemma":[0.9948097,4.6051153e-7,0.000024608396,0.00014458249,0.0001471197,7.2767324e-7,0.00003636928,0.000012299597,0.0048241643],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99904424,0.000044266195,0.00029009787,0.00023930892,0.00020291586,0.0001791523],"domain_scores_gemma":[0.99918336,0.00004960513,0.00030427665,0.00038520753,0.000048728663,0.000028801365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006402773,0.00014289404,0.00021578891,0.0008469769,0.00022742078,0.0004867521,0.0008175256,0.000046588553,0.0000065945783],"category_scores_gemma":[0.00005731257,0.0001359855,0.0002689838,0.0016786492,0.000064296124,0.0030574407,0.00036585814,0.00014375937,0.000030823587],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001819503,0.00073843193,0.8913672,0.00034420163,0.00026312858,0.00034340558,0.00022719086,0.011387891,0.00021942123,0.08155924,0.0075399163,0.005828043],"study_design_scores_gemma":[0.001502664,0.000102299164,0.92081773,0.0023728411,0.00038754323,0.000011669127,0.0022953341,0.008335704,0.00057443464,0.0046909284,0.057922732,0.0009861387],"about_ca_topic_score_codex":0.000435423,"about_ca_topic_score_gemma":0.000053567597,"teacher_disagreement_score":0.19963892,"about_ca_system_score_codex":0.0000746591,"about_ca_system_score_gemma":0.000022299368,"threshold_uncertainty_score":0.5545327},"labels":[],"label_agreement":null},{"id":"W7072150651","doi":"","title":"Update on IRC research activities","year":2001,"lang":"en","type":"article","venue":"NPARC","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Stress (linguistics); Research program; Code (set theory); Construction industry; Building code","score_opus":0.07412160209121361,"score_gpt":0.3136415408837719,"score_spread":0.23951993879255828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7072150651","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5500259,0.000006627439,0.000029653487,0.0045614545,0.00009894044,0.000053348365,4.5716794e-7,0.00011776115,0.44510588],"genre_scores_gemma":[0.9923491,0.000013731116,0.00010529036,0.0017914579,0.0016051468,0.000014331102,0.000009731942,0.000023566945,0.004087637],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99869645,0.000024660543,0.00012836323,0.0002563836,0.00051759253,0.00037657027],"domain_scores_gemma":[0.99933493,0.0001225513,0.000056865174,0.0003377058,0.00013540527,0.000012542415],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0007950483,0.000100974015,0.00012847432,0.00046235375,0.00030462214,0.00034429782,0.00027800928,0.00004308795,0.0017166785],"category_scores_gemma":[0.00037206992,0.00009200943,0.00006141987,0.00088432495,0.00006835252,0.00051716535,0.000119764765,0.00024047498,0.0034047228],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028055615,0.0004533151,0.117784984,0.00014507755,0.00017340471,0.00021759271,0.00015353366,0.00025627774,0.013857119,0.14880535,0.56059307,0.15727974],"study_design_scores_gemma":[0.0005305644,0.000017751296,0.0122252805,0.00008828824,0.000051977124,0.000002570761,0.00073725655,0.006954298,0.00064764754,0.047547076,0.9308178,0.00037947998],"about_ca_topic_score_codex":0.00016722774,"about_ca_topic_score_gemma":0.000048707774,"teacher_disagreement_score":0.44232324,"about_ca_system_score_codex":0.000041007992,"about_ca_system_score_gemma":0.000011877792,"threshold_uncertainty_score":0.9991959},"labels":[],"label_agreement":null},{"id":"W7097273520","doi":"","title":"The real cost of the automobile: a report on recent research","year":2016,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Activity-based costing; Automotive industry; Cost driver; Cost–benefit analysis; Total cost","score_opus":0.08208819050494974,"score_gpt":0.33934865280694093,"score_spread":0.2572604623019912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097273520","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42543998,0.000021047383,0.000045233162,0.050531164,0.00059106416,0.0005586999,0.0000013912426,0.00014586885,0.52266556],"genre_scores_gemma":[0.97438157,0.000089623376,0.000011328903,0.0003924776,0.0005929917,0.000038160782,0.0000012964699,0.000016289836,0.02447626],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.998376,0.000055800843,0.00031402108,0.00023643138,0.00072699,0.00029077145],"domain_scores_gemma":[0.9976,0.0006044698,0.00022084892,0.00092842145,0.0006373282,0.000008919381],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032281976,0.00008260222,0.00010963622,0.000104904524,0.00044254982,0.00013672488,0.00054193183,0.000037211714,0.0002536458],"category_scores_gemma":[0.003488643,0.000029876166,0.000085768595,0.0009455969,0.0001968698,0.00015668588,0.00037545952,0.00012850137,0.00029014176],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001014434,0.00016910453,0.25511506,0.000036605616,0.00011621381,0.00003107798,0.00003263558,0.000024439652,0.0023694236,0.051409226,0.51330113,0.17729364],"study_design_scores_gemma":[0.00034479343,0.000010765107,0.0854814,0.00014217522,0.000035293637,0.0000027040203,0.00019836999,0.00043828302,0.0014204321,0.0037434848,0.90804684,0.00013547078],"about_ca_topic_score_codex":0.001443399,"about_ca_topic_score_gemma":0.00047723204,"teacher_disagreement_score":0.5489416,"about_ca_system_score_codex":0.00006715683,"about_ca_system_score_gemma":0.00004817747,"threshold_uncertainty_score":0.41764835},"labels":[],"label_agreement":null},{"id":"W7097710385","doi":"","title":"Director of Physical Plant Director of Physical Plant","year":2011,"lang":"en","type":"article","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Plant life; Research policy; Process plant; Plant growth","score_opus":0.03492357984816675,"score_gpt":0.2170418880869762,"score_spread":0.18211830823880945,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097710385","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9492237,0.0000140320135,0.000046757166,0.00004093284,0.0001086413,0.00010480776,0.00003380725,0.00014093843,0.050286382],"genre_scores_gemma":[0.99842495,0.0000014578076,0.00014037068,0.00009815684,0.0009861869,0.000007770968,0.00004000074,0.000026712067,0.00027442453],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9987511,0.000015290443,0.0003123312,0.00029375887,0.0003664839,0.00026103688],"domain_scores_gemma":[0.9990012,0.00017043133,0.00032277443,0.00034302927,0.0001418286,0.000020758665],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015375964,0.00020457011,0.0005382098,0.00020946568,0.000048418475,0.000027401687,0.0003146922,0.00004106624,0.00024581954],"category_scores_gemma":[0.00020262449,0.00015400427,0.00027762318,0.00046066148,0.00009459289,0.00033783034,0.00018580463,0.00009913702,0.00015054959],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011265605,0.010563363,0.5691612,0.00279357,0.0026142157,0.00010341218,0.0051445686,0.00017334966,0.21085994,0.13741614,0.038208656,0.021835068],"study_design_scores_gemma":[0.0036070144,0.0003243487,0.38626814,0.0009013217,0.003040747,0.000005156025,0.0013104288,0.23676951,0.33811375,0.0059057283,0.021101464,0.0026523753],"about_ca_topic_score_codex":0.002943875,"about_ca_topic_score_gemma":0.00009064912,"teacher_disagreement_score":0.23659617,"about_ca_system_score_codex":0.000013079595,"about_ca_system_score_gemma":0.000013848028,"threshold_uncertainty_score":0.62801117},"labels":[],"label_agreement":null},{"id":"W7124947458","doi":"10.5281/zenodo.18309046","title":"Maximizing Profitability Through Landed Cost Optimization With SAP Transportation Management","year":2023,"lang":"","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakeshore General Hospital","funders":"","keywords":"Profitability index; Profitability index; Context (archaeology); Context (archaeology); Product (mathematics); Product (mathematics); Supply chain; Supply chain; Cost driver; Cost driver; Visibility","score_opus":0.047798915615684445,"score_gpt":0.24386322711278705,"score_spread":0.1960643114971026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7124947458","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17201892,0.00036009884,0.33346027,0.014806136,0.0012718699,0.012441906,0.0009259572,0.01637453,0.4483403],"genre_scores_gemma":[0.9724578,0.0004323375,0.0025261722,0.00049060694,0.0006779486,0.0000011055223,0.018302247,0.0031525623,0.0019591963],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99610233,0.00021170276,0.0007083344,0.001115267,0.0010144244,0.00084793713],"domain_scores_gemma":[0.99704885,0.000040389987,0.0005080927,0.000840903,0.0014821287,0.00007960226],"candidate_categories":["metaepi_narrow","sts","scholarly_communication","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0015983954,0.0004166293,0.00038719727,0.00076079817,0.0042202803,0.0032290907,0.0011447327,0.00013008763,0.009139013],"category_scores_gemma":[0.0004262757,0.00043478288,0.00013679334,0.005027191,0.00023977442,0.0021153325,0.00071499747,0.0003849696,0.010180064],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021380049,0.0017891296,0.0017435773,0.009171754,0.00246995,0.00050526636,0.009751049,0.47706908,0.0005059972,0.0214388,0.21983308,0.25358433],"study_design_scores_gemma":[0.0034841923,0.00015690434,0.012160017,0.00063078286,0.0009330919,0.00001552798,0.006225524,0.13443178,0.00007728693,0.0005357096,0.84017235,0.0011768613],"about_ca_topic_score_codex":0.00015380324,"about_ca_topic_score_gemma":0.0000041010817,"teacher_disagreement_score":0.8004389,"about_ca_system_score_codex":0.00028051776,"about_ca_system_score_gemma":0.0000055949927,"threshold_uncertainty_score":0.9998104},"labels":[],"label_agreement":null},{"id":"W7124988070","doi":"10.5281/zenodo.18309047","title":"Maximizing Profitability Through Landed Cost Optimization With SAP Transportation Management","year":2023,"lang":"","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakeshore General Hospital","funders":"","keywords":"Profitability index; Profitability index; Context (archaeology); Context (archaeology); Product (mathematics); Product (mathematics); Supply chain; Supply chain; Cost driver; Cost driver; Visibility","score_opus":0.047798915615684445,"score_gpt":0.24386322711278705,"score_spread":0.1960643114971026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7124988070","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17201892,0.00036009884,0.33346027,0.014806136,0.0012718699,0.012441906,0.0009259572,0.01637453,0.4483403],"genre_scores_gemma":[0.9724578,0.0004323375,0.0025261722,0.00049060694,0.0006779486,0.0000011055223,0.018302247,0.0031525623,0.0019591963],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99610233,0.00021170276,0.0007083344,0.001115267,0.0010144244,0.00084793713],"domain_scores_gemma":[0.99704885,0.000040389987,0.0005080927,0.000840903,0.0014821287,0.00007960226],"candidate_categories":["metaepi_narrow","sts","scholarly_communication","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0015983954,0.0004166293,0.00038719727,0.00076079817,0.0042202803,0.0032290907,0.0011447327,0.00013008763,0.009139013],"category_scores_gemma":[0.0004262757,0.00043478288,0.00013679334,0.005027191,0.00023977442,0.0021153325,0.00071499747,0.0003849696,0.010180064],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021380049,0.0017891296,0.0017435773,0.009171754,0.00246995,0.00050526636,0.009751049,0.47706908,0.0005059972,0.0214388,0.21983308,0.25358433],"study_design_scores_gemma":[0.0034841923,0.00015690434,0.012160017,0.00063078286,0.0009330919,0.00001552798,0.006225524,0.13443178,0.00007728693,0.0005357096,0.84017235,0.0011768613],"about_ca_topic_score_codex":0.00015380324,"about_ca_topic_score_gemma":0.0000041010817,"teacher_disagreement_score":0.8004389,"about_ca_system_score_codex":0.00028051776,"about_ca_system_score_gemma":0.0000055949927,"threshold_uncertainty_score":0.9998104},"labels":[],"label_agreement":null},{"id":"W7162094894","doi":"10.82308/26966","title":"Life cycle cost of support poles in distribution lines","year":2004,"lang":"en","type":"dissertation","venue":"","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Point (geometry); Hazard; Distribution (mathematics); Class (philosophy); Line (geometry); Electric power transmission; Probability distribution","score_opus":0.013894467793612444,"score_gpt":0.2566378435013833,"score_spread":0.24274337570777085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7162094894","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9486434,0.00012587204,0.00018421422,0.0006450006,0.0006514962,0.00040774856,0.000047092086,0.0001786882,0.049116496],"genre_scores_gemma":[0.9830665,0.000023481582,0.000030463034,0.00032901304,0.00066186365,0.000023324772,0.013542838,0.000035753044,0.0022867674],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9984898,0.0000064111846,0.0006264261,0.0003144544,0.0003243102,0.00023860346],"domain_scores_gemma":[0.99882853,0.000031439693,0.0005606365,0.00023405995,0.0003267092,0.000018651272],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025411285,0.00024156274,0.00044371872,0.00043066885,0.000057181867,0.00011688208,0.0002455586,0.0002111836,0.00049361103],"category_scores_gemma":[0.0010515911,0.00023378922,0.00016693735,0.0008433521,0.000022626407,0.00042677205,0.000044289733,0.000174478,0.00020005513],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00096292264,0.002975865,0.7264771,0.014969801,0.0011236322,0.00012656601,0.0007434845,0.0225949,0.0019191586,0.065246515,0.08634247,0.07651757],"study_design_scores_gemma":[0.004117333,0.000037491223,0.9150342,0.0029000768,0.0018464413,0.0000014741296,0.008328835,0.014499549,0.0024380933,0.008993083,0.038954157,0.0028493002],"about_ca_topic_score_codex":0.008042012,"about_ca_topic_score_gemma":0.00731085,"teacher_disagreement_score":0.18855706,"about_ca_system_score_codex":0.00007379798,"about_ca_system_score_gemma":0.00016182713,"threshold_uncertainty_score":0.9985635},"labels":[],"label_agreement":null},{"id":"W73491776","doi":"","title":"Intelligent Transportation Systems Investment Evaluation: To Purchase or Lease","year":2006,"lang":"en","type":"article","venue":"Transportation Research Board 85th Annual MeetingTransportation Research Board","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Lease; Asset management; Investment (military); Asset (computer security); Net present value; Order (exchange); Computer science; Return on investment; Term (time); Risk analysis (engineering); Operations research; Transport engineering; Actuarial science; Business; Operations management; Finance; Engineering; Economics; Production (economics); Computer security","score_opus":0.11356369019889653,"score_gpt":0.38484844068243107,"score_spread":0.2712847504835345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W73491776","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9760497,0.00046900817,0.0038230706,0.0047201724,0.0006730739,0.0064674183,0.00048789915,0.00064703246,0.0066625844],"genre_scores_gemma":[0.9860353,0.00006743385,0.0013045355,0.00081879855,0.002142655,0.0029393872,0.0036306356,0.0002083942,0.002852868],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9817138,0.00076273584,0.0025903194,0.0020934276,0.010073731,0.0027660036],"domain_scores_gemma":[0.98485994,0.00085734937,0.00055497634,0.001138918,0.012111221,0.000477586],"candidate_categories":["metaepi_narrow","sts","scholarly_communication","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.015467258,0.00079969346,0.0009133585,0.0045221774,0.0019179046,0.0012341357,0.0012587137,0.0004155583,0.0014067312],"category_scores_gemma":[0.0013785163,0.000763277,0.00041506445,0.00873083,0.00062316726,0.0030365237,0.000029380164,0.0015852118,0.0017380695],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.010760893,0.0044179466,0.2677256,0.0055632293,0.00088876754,0.001786993,0.010520296,0.34541026,0.0077441656,0.15274827,0.17144473,0.02098887],"study_design_scores_gemma":[0.0057595493,0.0007434982,0.556679,0.0012505087,0.0007295512,0.0000013029212,0.024950884,0.019296618,0.0013725726,0.0066013755,0.3802062,0.0024089508],"about_ca_topic_score_codex":0.0979105,"about_ca_topic_score_gemma":0.06922365,"teacher_disagreement_score":0.32611364,"about_ca_system_score_codex":0.00072325167,"about_ca_system_score_gemma":0.00087743485,"threshold_uncertainty_score":0.9998027},"labels":[],"label_agreement":null},{"id":"W839301564","doi":"","title":"Life Cycle Cost Analysis of Pavements: State-of-the-Practice","year":2006,"lang":"en","type":"article","venue":"TigerPrints (Clemson University)","topic":"Life Cycle Costing Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"South Carolina Department of Transportation; U.S. Department of Transportation","keywords":"Transport engineering; Life-cycle cost analysis; Process (computing); Computer science; Engineering; Operations research; Operations management; Risk analysis (engineering); Business","score_opus":0.009861513557493363,"score_gpt":0.2033565236975869,"score_spread":0.19349501014009352,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W839301564","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9333066,0.000014145301,0.0014986634,0.00055341737,0.00011932129,0.000177864,0.000015750964,0.00006911429,0.06424517],"genre_scores_gemma":[0.99746823,0.0000075098574,0.00014806208,0.00037481252,0.00007566688,4.423309e-7,0.000019614217,0.00001509903,0.0018905771],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99860984,0.00004928149,0.00036222168,0.0003019806,0.00042665907,0.00025002632],"domain_scores_gemma":[0.9980028,0.00014957107,0.00081383367,0.00054897385,0.00045780864,0.000027001352],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037281273,0.00015839713,0.00037495996,0.0011807844,0.00016686726,0.0000537527,0.0006065942,0.00004805099,0.00033143038],"category_scores_gemma":[0.00052441075,0.00015501385,0.00033557657,0.0052440874,0.00012444454,0.0008105235,0.00040720982,0.00011949972,0.00008508117],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020706523,0.0008382305,0.8811138,0.00016575641,0.0036659432,0.00003765104,0.00013085741,0.08023366,0.0018808587,0.019464443,0.0024334146,0.009828288],"study_design_scores_gemma":[0.0016806258,0.000012634927,0.69794744,0.000106275314,0.00967878,3.9421042e-7,0.0012731813,0.039726783,0.0011539544,0.0007144221,0.24702844,0.0006770916],"about_ca_topic_score_codex":0.0085208565,"about_ca_topic_score_gemma":0.0007331252,"teacher_disagreement_score":0.24459502,"about_ca_system_score_codex":0.00008660481,"about_ca_system_score_gemma":0.00005245106,"threshold_uncertainty_score":0.9980815},"labels":[],"label_agreement":null}]}